SP-32
l. The backfill shall be thoroughly water-settled and additional prepared soil mix added to fill any remaining void below finish grade.
m. Planting holes shall be backfilled with a prepared soil mix. Soil shall consist of 50% of the specified topsoil, and 50% organic soil amendment.
Trees shall be installed with root barriers if specified on plans and in accordance with the installation procedure described in Section 801-11.
PART 9 SPECIFIC CONDITIONS
Section 900 -WORK AREA
900-1.1 Park Access
The subject work area is the northerly portion of the South Park. The southerly portion of the park which includes play field area, walkways and seating areas shall remain open to the public during the course of construction. Contractor shall provide, install and maintain, in good condition and at all times, temporary fencing around the perimeter of the designated work area. 900-1.2 Contractor Laydown and Storage Area
located within the work area related to the scope of work and shall remain secured and separated from the rest of the park by the contractor installed temporary fencing.
Section 901- CONSTRUCTION MANAGEMENT SOFTWARE
900-1.1 Procore Software
The contractor shall use the Procore construction management software (with account for the project made available by the City at no additional cost) for various construction management activities related to the project including but not limited to submission of schedules, project material submittals, and RFIs. Project documents including plans and specifications will also be
SP-33
SCHEDULE OF PERFORMANCE
CIP 603 SOUTH PARK SLOPES AND IRRIGATION REPAIRS
SECTION 1. BEGINNING OF WORK, TIME OF COMPLETION
1. Attention is directed to the provisions of Section 6-1 ("Construction Schedule and Commencement of the Work"), Section 6-1.1 ("Construction Schedule"), and Section 6-9 ("Liquidated Damages"), of the State Specifications, and these Provisions.
2. The Contractor shall complete work within seventy-five (75) working days after receiving the "Notice to Proceed". After completion of work, the contractor shall maintain the work for an additional ninety (90) calendar days for the purpose of plant and grass establishment.
3. The Contractor and its securities will pay the sum of one thousand two hundred dollars ($1,200) as liquidated damages for each consecutive calendar day of delay in the performance of the work in this agreement and as shown on the plans.
SP-34
SOLID WASTE REPORTING
CIP No. 603 SOUTH PARK SLOPES AND IRRIGATION REPAIRS
SOLID WASTE REPORTING
Pursuant to the California Integrated Solid Waste Management Act of 1989, the City is required to report the amount of solid waste generated within the City and the disposal of that waste with the ultimate required goal of being a reduction of at least 50% in the amount of solid waste being disposed in landfills. To permit the City to comply with this State law, the Contractor is required to complete the Solid Waste Report form, a copy of which is included in these special provisions.
The report includes a summary of the solid waste generated by the project, a summary of solid waste disposed of at class III landfills and a summary of solid waste diverted form disposal through recycling and re-use. The Contractor may use a self-generated report format that includes all of the information included on the City form.
The report shall be filed with the City after project completion and prior to final payment. If the project time span includes more than one calendar year, a separate report is required for the solid waste in each calendar year. A report for a calendar year that does not coincide with project completion shall be filed with the City on or before January 31st.
Supporting documents to be submitted with the report shall include legible copies of weigh tickets, receipts, or invoices that specifically identify the job site location that generated the waste materials. If materials are taken to a location where weigh tickets, receipts, or invoices are not available, the Contractor shall provide the documentation on its own company letterhead.
The Contractor is encouraged to divert solid waste from disposal at landfills through recycling and re-use when possible while maintaining compliance with all other Contract specifications and special provisions.
SP-35
SP-36
C CONSTRUCTION NOTICE TEMPLATE
COMPANY LETTERHEAD
NOTICE OF WORK/CONSTRUCTION
Name of Project Date of Notice
Dear Residents and Businesses (if applicable):
Provide a brief description of the work that is to be performed. Four to five sentences should suffice.
What: Provide a brief description of what
is happening. One sentence should suffice.
Start/Duration: When is the project
expected to start and how long is it
anticipated to take for it to be completed?
If there are different phases, indicate the
estimated time.
What to Expect: Will there be noise? Will
there be flaggers directing traffic? Will
residents have access or will it be a full
closure? Will parking be temporarily
blocked? Include enough details.
Equipment in Use: What kind of
equipment will be seen?
Working Hours: What are the working
hours and days?
Contact Information
Always include contact information for residents and business owners in case they have questions or concerns.
We apologize for any inconvenience and thank you for your patience. Sincerely, Contractor Name
Map detailing what
streets will be closed.
SP-37
D - HAUL ROUTES
1315 Valley Drive, Hermosa Beach, CA 90254 | hermosabeach.gov | HermosaBeachCity HermosaBchCity
ADDENDUM No. 1
CIP 603 – South Park Slope and Irrigation Repairs
DATE: 1/14/2025
TO: All Prospective Bidders
Please note the following changes and/or additions to the Notice Inviting Bids for the project indicated above.
1. Refer to Notice INVITING BIDS
Delete the paragraph:
Notice is hereby given that the City of Hermosa Beach will receive electronic bids until 2:00PM on Thursday, January 16, 2024, at which time the electronic bids will be publicly opened at the City Council Chambers at 1315 Valley Drive, Hermosa Beach, CA 90254 and posted on Planet Bids for CIP 603 – South Park Slope and Irrigation Repairs
Replace with the following:
Notice is hereby given that the City of Hermosa Beach will receive electronic bids until 2:00PM on Thursday, January 23, 2024, at which time the electronic bids will be publicly opened at the City Council Chambers at 1315 Valley Drive, Hermosa Beach, CA 90254 and posted on Planet Bids for CIP 603 – South Park Slope and Irrigation Repairs
1315 Valley Drive, Hermosa Beach, CA 90254 | hermosabeach.gov | HermosaBeachCity HermosaBchCity
ADDENDUM ISSUED BY: _____________________________________ John Oskoui, Interim City Engineer
ACKNOWLEDGEMENT OF ADDENDUM No. 1
CIP 603 – South Park Slope and Irrigation Repairs
Complete and sign this acknowledgement form. Enclose the original copy of the acknowledgement in your bid. Failure to do so may result in disqualification of your firm’s bid.
The undersigned acknowledges receipt of Addendum No. 1 dated January 14, 2025.
ATTEST: _____________________________________
Principal: _____________________________________
Address: _____________________________________
By: _____________________________________
Title: _____________________________________
1315 Valley Drive, Hermosa Beach, CA 90254 | hermosabeach.gov | HermosaBeachCity HermosaBchCity
ADDENDUM No. 2
CIP 603 – South Park Slope and Irrigation Repairs
DATE: January16, 2025
TO: All Prospective Bidders
Please note the following changes and/or additions to the Noticing Inviting Bids and Plans for the project indicated above.
1. Response to Questions
1. Can bid bonds be submitted through PlanetBids, or does a hard copy need to be submitted?
A. Bid Bonds must be scanned and included as part of the bid submittal. A hard copy is not required.
2. Is Builder's Risk or Course of Construction insurance required? A. No, Builder’s Risk or Course of Construction insurance is not required.
3. Is Pollution Legal Liability or Asbestos Legal Liability or Errors and Omissions coverage required?
A. No, Pollution Legal Liability or Asbestos Legal Liability, nor Errors and Omissions coverage is not required.
4. Per part IV. Bid documents, A. Proposal, Standard Specifications for Public Works Construction 2021 version shall be used. However, per part VI. Special Provisions, Standard Specifications for Public Works Construction 2024 version shall be used.
Also, per sheet G-00 Hermosa Beach general notes 2, latest version shall be used. Please clarify which version shall be used.
A. The 2021 Standard Specifications for Public Works Construction shall be used.
5. Per notice inviting bid, wage rate shall be State prevailing. However, per special provisions 5-8.4, prevailing wage rate shall be higher of the two State and Federal wage rates. Please clarify.
1315 Valley Drive, Hermosa Beach, CA 90254 | hermosabeach.gov | HermosaBeachCity HermosaBchCity
A. For this project, the State prevailing wages are the higher of the two wage rates and shall control.
6. Please provide grading plan with contour and elevation for slope clarification.
A. Grades to match existing as seen in the field. No topographic survey or grading plans are provided.
7. Per detail B sheet L-09, planter pit shall be 2 times of root ball size. However, per callout on the same detail it shall be 3 times of root ball size. Please clarify.
A. Utilize dimension of 2x size of rootball. See revised detail, Sheet L-09, Addendum No. 02.
8. Per detail E and F on sheet L-09, tree root aeration unit shall be per specs.
However, specification does not specify. Please provide material and installation requirements for tree root aeration unit.
A. Refer to Appendix B, Revised Specification Section 329400 Landscape Planting Accessories for clarification.
9. Per specification 329113, 3.5 Clearing & cultivation, C.7 Planting soil amendment schedule, commercial fertilizer shall be at indicated ratio, per selected manufacturer. However, per 2.3 Chemical soil amendment components, there are multiple fertilizer options without ratio (F to N). Please clarify which shall be used as commercial fertilizer for soil amendments and ratio of chosen fertilizer.
A. Specification Section 329113 takes precedence. Final soil amendments dependent on contractors' testing and results of the Agronomic Soil Fertility Report (as performed by a reputable lab, see section 1.4.D).
10. Please provide depth for installation of class A topsoil to match adjacent sidewalk ways per special provision 801-2.1.
A. Refer to Specification Section 329113.
11.Please clarify which bid item shall paid for furnish and place parkway topsoil to match adjacent sidewalk grade per special provision 801-2.1.
A. Disregard special provision 801-2.1. No additional bid item. Special Provisions have been updated accordingly. See Appendix F, Updated Special Provisions.
1315 Valley Drive, Hermosa Beach, CA 90254 | hermosabeach.gov | HermosaBeachCity HermosaBchCity
12. Per special provision 801-4.5, root barrier shall be in accordance with installation procedure described in Section 801- 11. However, this section 801-11 is not available in special provisions and Greenbook. Please clarify.
A. Refer to Revised Specification Section 329400 Landscape Planting Accessories for clarification.
13. Please provide model of 1" full port brass ball valve as shown in detail D/ I-04.
A. This item is to be an "as approved" item, but preferred model: NIBCO T-FP600A brass, full Port, Ball Valve or approved equal.
14. Refer to irrigation material legend on sheet I-03 and technical specs section 328400/ 3.2, sleeves under pedestrian paving shall be 24" depth and under vehicular paving shall be 36" depth. While, in detail J/ I-05, depth for lateral line sleeves under pedestrian paving shall be 12" depth and under vehicular paving shall be 24" depth. Please clarify.
A. Use the dimensions as shown on the detail. The depth below paving shall be different for lateral lines versus mainlines.
15.In irrigation material legend on Sheet I-03, please confirm gate valve shall be per mainline size.
A. Yes, all gate valves shall be sized to match the mainline on which they are installed.
16.Please provide irrigation as-built plan if any.
A. Refer to Appendix D, Irrigation As-Built plan.
17.Refer to note A and B on sheet I-01, existing control wires shall be reused for new valves. However, in legend of controller on sheet I-03, contractor shall route all new wires from new and existing RCVs. Please clarify.
A. The contractor may use the existing wires if they are intact and functional.
Test all existing wires for continuity. Any faulty wires shall be replaced with new. Any extensions of wired required to reach the new controller shall be new.
18. Please confirm all existing bubblers (without symbol) serving all existing trees within limit of work shall be replaced with new bubblers per legend. If not, please specify which existing bubblers need to be replaced and which do not need.
1315 Valley Drive, Hermosa Beach, CA 90254 | hermosabeach.gov | HermosaBeachCity HermosaBchCity
A. All existing tree bubblers shall be replaced with new tree bubblers as described in the legend.
19. Based on general provision, section 7 measurement and payment, 7-4.7 irrigation system consists of backflow preventer and sensors. However, irrigation material legend on sheet I-03 does not call out a backflow preventer and sensor. Please clarify.
A. The irrigation plans assume that the existing backflow preventor and sensors are operational and in good condition and are to remain in service. No new backflow or sensors have been specified. The Special Provisions have been updated accordingly. See Appendix F, Updated Special Provisions.
20. In technical specs section 321513/2.4.D, edging/ header material shall be refer to section 329400 but this section does not mention any information about edging/ header. Please clarify.
B. Refer to Appendix B, Revised Specification Section 329400 Landscape Planting Accessories for clarification.
21. Please provide detail of installation for existing boulder to be relocated.
A. Refer to Appendix A, Revised Plans. See added detail I/L-07
22.Please provide detail and depth of concrete installed under all loosen existing boulders.
A. Refer to Appendix A, Revised Plans. See added detail J/L-07
23. Please provide detail of wood stairs that need to be repaired in case of broken.
A. Refer to Appendix A, Revised Plans. See added detail H/L-07
24. Please confirm that only existing boulders that are shown within limit of work symbol on sheet L-03 need to be secured with concrete in case of loosen, the boulders outside limit of work symbol do not need concrete installed under.
A. Boulders within the limits of the park shall be secured with concrete in case of loosened material. Refer to Appendix A for updated quantities of boulders to be salvaged and relocated.
25.Please specify on plan which existing boulders need to be secured with concrete.
1315 Valley Drive, Hermosa Beach, CA 90254 | hermosabeach.gov | HermosaBeachCity HermosaBchCity
A. Boulders within limit of park. Refer to Appendix A for updated quantities of boulders to be salvaged and relocated.
27. Project is asking for 5 million GL and 5 million Auto. Can a contractor use an umbrella policy to make up the difference between the required amount and the contractor's current coverage amount?
A. Contractors may choose a combination of primary GL and excess/umbrella to meet the $5 million minimum limits.
28. Project says that professional insurance will be required for the project if it is design build. Is this project classified as a Design / Build project? A. This is a design-bid-build project. Professional Liability insurance is not required.
29. With no building structures on the project, is Builder's Risk still required on this project?
A. Builder’s Risk is not required.
30. Is this project subject to any agreements of any sort? Is it Federal? A. This project is not funded through federal funds and is not subject to any agreements with the federal government.
31. Please confirm proposed start date of construction and completion. Are there as builts that can be provided for review?
A. The revised bid opening (Refer to Addendum No.1 issued on January 14, 2025) is set for Thursday, January 23, 2025. Typically, it takes about six weeks after the bid opening to award a contract. From there on, it takes about a month to execute the contract and issue the Notice to Proceed.
As such, the projected start date for construction is middle of March 2025.
32. Does the city require a hard copy / wet signature copy of the bid bond by the due date, or will the electronic, scanned copy suffice? A. Bid Bonds must be scanned and included as part of the bid submittal. A hard copy is not required.
33. Is a Contractor Pollution Liability policy sufficient to meet the Contractor’s Pollution Legal Liability requirement in the insurance specifications?
1315 Valley Drive, Hermosa Beach, CA 90254 | hermosabeach.gov | HermosaBeachCity HermosaBchCity
A. The City would have to review the actual policy against the scope of work in order to ascertain whether it does.
34. For bid item 5 Temp Fence. Given the limits of work as shown on the plans, please confirm if a permitter fence is acceptable for the duration of construction or will each work area / island require a separate fence per the limits of work.
Essentially, is it acceptable to close the north side of the park, the playgrounds and walking paths as shown in the hatched area on the site map photo on G-00? A. Refer to Appendix C, Temporary Construction Fence Plan.
35. Please confirm whether this project is subject to a PLA (Project Labor Agreement), a PSA (Project Stabilization Agreement), a CBA (Collective Bargaining Agreement), a CWA (Community Workforce Agreement), or anything of that nature?
A. This project is not subject to a PLA, a CBA, nor a CWA.
36. Is this project subject to State Prevailing Wage Rates OR Federal Davis-Bacon Wage Rates (or both)?
A. This project is subject to State Prevailing Wage Rates.
37. Please confirm if a Mandatory Pre-Bid Meeting will be held? If so, what date, time, and location?
A. A mandatory pre-bid meeting was not held; however, a non-mandatory pre-bid meeting took place on January 6th at 11:00 AM at South Park.
38. Is an original hard copy of the Bidder's Bond required to be submitted to the agency’s office by/before the bid due date and time?
A. Bid Bonds must be scanned and included as part of the bid submittal before the bid due deadline. A hard copy is not required.
39. Bid item 15 directs contractor concrete in place all loose boulders within the play area. 1) Does this include boulders shown in the play area which are not within he limits of work? B) can you please provide a count/quantity of boulders and sizes, or at the very least define the areas with loose boulders? C) Failing B, can you provide a quantity for bidding purposes? It could be anywhere from 10EA to more than 200 EA, it is difficult to determine.
A. See response to Questions 21 to 25.
1315 Valley Drive, Hermosa Beach, CA 90254 | hermosabeach.gov | HermosaBeachCity HermosaBchCity
40. Per special provision 801-4.5.m, backfill mix shall consist of 50% topsoil and 50% organic soil amendment. However, per specification 329300/3.3C-5, backfill mixture shall be 1/4 yard of bulk composted organic amendment material and 1/2 pound of Granular Soil Conditioning Material & Fertilizer. Please clarify.
A. Disregard provision 801-4.5.m. Specification Section 329300 takes precedent.
41. Per 3-7.2 Precedence of Contract Documents, please clarify position of part VI.
Technical Specification in the order of precedence.
A. In reference to Section 3-7.2, precedence of the Technical Provisions is "14. Reference Specifications".
42. In case of discrepancy between numerals and words, please clarify which shall take precedence. For example, see specs 329113/3.5A Clearing, words state two inches while numerals state 1".
A. Written numerals take precedence.
43. Per detail B sheet L-09, there shall be erosion control material on slope per specification. However, there are no grading plan to verify slopes, and no erosion control specification for erosion control material. Please clarify.
C. Refer to Appendix B, Revised Specification Section 329400 Landscape Planting Accessories for clarification.
44. Per special provision 800-1.1, topsoil shall be used where topsoil/parkway fill is indicated on plans. However, there is no indication for topsoil on plans. Please clarify.
A. Disregard Special Provision 800-1.1. No topsoil fill. Special Provisions have been updated accordingly. See Appendix F.
45. Please confirm there is no valve manifold needed as shown in tech specs 328400/2.4E-4.
A. No manifold assemblies shall be required. Install new valves as shown on the details.
46. Please clarify which bid item shall be paid for the 'Demo and remove existing groundcover, turf and shrubs. Protect in place existing irrigation and trees' as shown on sheet D-01 with quantity 4,320 SF in the demo legend.
1315 Valley Drive, Hermosa Beach, CA 90254 | hermosabeach.gov | HermosaBeachCity HermosaBchCity
A. Please refer to Section 7-3.4 ...."Mobilization shall include any work shown on the plans, including removal and/or relocation of an item of work shown on construction documents, which has no corresponding bid item for said work. This work shall include removal of vegetation, removal and/or modifications to the existing planters,.." Payment for mobilization shall be per the Lump Sum price bid not exceeding 5% of the total bid amount. The provided quantity of 4,320 SF is to assist the contractor with estimating the cost of the related work to be included in the bid item for mobilization.
47. Please provide detail for existing tree protection.
A. Refer to Specification Section 02 5639 – Temporary Tree & Plant Protection for information regarding tree protection measures.
48. Per legend sheet L-06, steel header shall be painted steel by JD Russel. However, per detail G sheet L-07 and manufacturer JD Russel website, steel header shall be self-weathering, which made from special steel material that does not require painting. Please clarify.
A. Steel headers to be self-weathering steel. Refer to Appendix A drawings for updated material schedule.
49. In irrigation material legend on sheet I-03 and tech specs 328400/3.8.A, the description of controller specified that we shall route all new wires from new and existing RCVs in the same depth as lateral line trenches. However, in detail I/ I-05, control wires have the same trenching depth as mainline. Please clarify.
A. Since the existing mainline is to be protected in place and reused, there is no way to install the wires per the standard pipe / wire detail. Install the wires in lateral line trenches to avoid damage to the mainline.
50. Refer to NOTICE INVITING BIDS
Delete the paragraph:
Notice is hereby given that the City of Hermosa Beach will receive electronic bids until 2:00PM on Thursday, January 23, 2024, at which time the electronic bids will be publicly opened at the City Council Chambers at 1315 Valley Drive, Hermosa Beach, CA 90254 and posted on Planet Bids for CIP 603 – South Park Slope and Irrigation Repairs
Replace with the following:
1315 Valley Drive, Hermosa Beach, CA 90254 | hermosabeach.gov | HermosaBeachCity HermosaBchCity
Notice is hereby given that the City of Hermosa Beach will receive electronic bids until 2:30PM on Thursday, January 23, 2024, at which time the electronic bids will be publicly opened at the City Council Chambers at 1315 Valley Drive, Hermosa Beach, CA 90254 and posted on Planet Bids for CIP 603 – South Park Slope and Irrigation Repairs
51. Refer to CIP 603 – SOUTH PARK SLOPE AND IRRIGATION REPAIRS Replace the Sheets D-01, L-02, L-03, L-06, L-07, L-09 and L-10 with their revisions included in Appendix A, Revised Plans.
52. Refer to Technical Provisions
Replace Specification Section 329400 – Landscape Planting Accessories with Appendix B.
52. Refer to Bid Schedule
Replace Bid Schedule with Appendix E, Updated Bid Schedule.
53. Refer to Special Provisions
Replace Special Provisions with Appendix F – Revised Special Provisions ADDENDUM ISSUED BY: _____________________________________ John Oskoui, Interim City Engineer
1315 Valley Drive, Hermosa Beach, CA 90254 | hermosabeach.gov | HermosaBeachCity HermosaBchCity
ACKNOWLEDGEMENT OF ADDENDUM No. 2
CIP 603 – South Park Slope and Irrigation Repairs
Complete and sign this acknowledgement form. Enclose the original copy of the acknowledgement in your bid. Failure to do so may result in disqualification of your firm’s bid.
The undersigned acknowledges receipt of Addendum No. 2 dated January 16, 2025.
ATTEST: _____________________________________
Principal: _____________________________________
Address: _____________________________________
By: _____________________________________
Title: _____________________________________
1315 Valley Drive, Hermosa Beach, CA 90254 | hermosabeach.gov | HermosaBeachCity HermosaBchCity
Appendix A
Revised Plans
Sheets D-01, L-02, L-03, L-06, L-07, L-09, L-10
LIMIT OF WORK LIMIT OF WORK LIMIT OF WORK LIMIT OF WORK LIMIT OF WORK DEMO LEGEND SYMBOL KEY DESCRIPTION QTY DEMOLITION PLAN D-01 0 10' 20' 1" = 20' 01/31/2026 811 W 7th Street, 8th Floor 04/22/2024 Los Angeles, California 90017-3419 United States www.swagroup.com +1.213.236.9090 o SWA Job Number HRBT101 Date 04/22/2024 C I T Y O F H E R M O S A B E A C H , C A 1 9 0 7 N DEMO LEGEND (CONT.) 11/09/2023 01/31/24 Page 1227 of 1852 SYMBOL DESCRIPTION REMARKS MATERIALS LEGEND LIMIT OF WORK LIMIT OF WORK LIMIT OF WORK LIMIT OF WORK MATERIALS PLAN L-02 01/31/2026 811 W 7th Street, 8th Floor 04/22/2024 Los Angeles, California 90017-3419 United States www.swagroup.com +1.213.236.9090 o SWA Job Number HRBT101 Date 04/22/2024 0 10' 20' 1" = 20' C I T Y O F H E R M O S A B E A C H , C A 1 9 0 7 N 11/09/2023 01/31/24 Page 1228 of 1852 SYMBOL KEY DESCRIPTION MATERIAL MATERIALS SCHEDULE SYMBOL KEY DESCRIPTION DETAIL SUPPLIER SIZE COLOR FINISH REMARK DETAILMATERIALS ENLARGEMENT L-03 PLAN 0 5' 10' 1" = 10' 01/31/2026 811 W 7th Street, 8th Floor 04/22/2024 Los Angeles, California 90017-3419 United States www.swagroup.com +1.213.236.9090 o SWA Job Number HRBT101 Date 04/22/2024 C I T Y O F H E R M O S A B E A C H , C A 1 9 0 7 N WALL LEGEND 11/09/2023 01/31/24 Page 1229 of 1852 SYMBOL ABBREVIATION BOTANICAL NAME COMMON NAME PLANTING SCHEDULE INSTALL SIZE SPACING WATER USE DETAIL REMARKS JEBRHCCI MATURE SIZE QTY. MP AM AOADAUBABG EAGL MF RCWG WF SYMBOL KEY DESCRIPTION MATERIAL WALL SCHEDULE (W) SUPPLIER SIZE COLOR REMARK DETAIL SYMBOL KEY DESCRIPTION MATERIAL MATERIALS SCHEDULE SUPPLIER SIZE COLOR FINISH REMARK DETAIL PLANT AND MATERIALS L-06 SCHEDULES 01/31/2026 811 W 7th Street, 8th Floor 04/22/2024 Los Angeles, California 90017-3419 United States www.swagroup.com +1.213.236.9090 o SWA Job Number HRBT101 Date 04/22/2024 11/09/2023 01/31/24 Page 1230 of 1852 HARDSCAPE DETAILS L-07 01/31/2026 811 W 7th Street, 8th Floor 04/22/2024 Los Angeles, California 90017-3419 United States www.swagroup.com +1.213.236.9090 o SWA Job Number HRBT101 Date 04/22/2024 11/09/2023 01/31/24 Page 1231 of 1852 PLANTING DETAILS L-09 01/31/2026 811 W 7th Street, 8th Floor 04/22/2024 Los Angeles, California 90017-3419 United States www.swagroup.com +1.213.236.9090 o SWA Job Number HRBT101 Date 04/22/2024 Page 1232 of 1852 01/31/2026 811 W 7th Street, 8th Floor 04/22/2024 Los Angeles, California 90017-3419 United States www.swagroup.com +1.213.236.9090 o SWA Job Number HRBT101 Date 04/22/2024 L-10 P:\HRB\HRBT101 South Park-Task 2\4 DrawingsGraphics\AutoCAD\Sheets\CONSTRUCTION DOCUMENTS\PLANTING\L-10 HEALTH DEPARTMENT GUIDELINES.dwg | RMCKAY |ARCH D (24.00 X 36.00 INCHES) | 1/15/2025 HEALTH DEPARTMENT GUIDELINES Page 1233 of 1852 1315 Valley Drive, Hermosa Beach, CA 90254 | hermosabeach.gov | HermosaBeachCity HermosaBchCity
Appendix B
Section 329400 – Landscape Planting Accessories
ADDENDUM 02
South Park Slope and Irrigation Repair LANDSCAPE PLANTING ACCESSORIES CIP - 603 329400 - 1
SECTION 329400 – LANDSCAPE PLANTING ACCESSORIES
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes materials, labor, apparatus, tools, equipment, temporary construction, transportation, and services necessary for and incidental to performing the proper completion of Work, as required to make a complete exterior Landscape Planting Accessories installation, as shown in the Contract Drawings, and as specified herein this Section.
B. Work under this Section consists of, but is not necessarily limited to, furnishing and installing the following:
1. Mulches (wood products).
2. Tree Root Aeration Units (a.k.a. Tree Chimney’s).
3. Root Control Barriers.
4. Stakes and Guys.
5. Erosion Control Materials.
6. Landscape Edgings (Edgings).
7. Weed Control Barrier / Geotextile Filter Fabric.
8. Miscellaneous Materials (Herbicides, Vitamin Stimulant/Root Hormone, etc.).
C. Related Sections: The following Sections contain requirements that relate to Work in this Section:
1. Section 312219 – Landscape Grading.
2. Section 321513 – Stabilized Decomposed Granite Paving.
3. Section 321313 – Concrete Paving.
4. Section 321323 – Site Concrete.
5. Section 328400 – Planting Irrigation.
6. Section 329113 – Soil Preparation.
7. Section 329200 – Lawns & Grasses.
8. Section 329300 – Exterior Plants.
9. Section 329813 – Landscape Establishment Period.
1.2 DEFINITIONS AND APPLICABLE STANDARDS
A. References:
1. ASTM – American Society for Testing and Materials.
2. ANSI – American National Standards Institute.
B. Definitions: (Not Used).
C. Measurements:
1. PSI: Measurement, in pounds per square inch.
2. CU/FT: Measurement, in cubic-foot.
3. PPM: Measurement, in parts per million.
ADDENDUM 02
South Park Slope and Irrigation Repair LANDSCAPE PLANTING ACCESSORIES CIP - 603 329400 - 2
1.3 SUBMITTALS
A. General:
1. Collect information into a single Submittal for each element of construction and type of product or equipment identified under this Section for review.
2. To expedite review, Submittal shall be organized and presented into specific sections or headings. Furnish neat, concise, legible, and clearly identifiable information, and sufficiently explicit detail, to enable proper evaluation for Contract compliance.
Highlight catalog, product data, or brochures containing various products, sizes, and materials to show particular item submitted.
3. Submittal Format: As applicable, furnish Submittal as a single electronic digital PDF (Portable Document Format) file.
B. Digital Submittal Information:
1. Product/Material Data. Submit available product/material literature supplied by manufacturer’s, indicating that their products comply with specified requirements.
Provide manufacturing source (name, address, and telephone number), and distributor source (name, address, and telephone number) for each type of product/material.
2. Qualification Data: Submit names for firms and persons specified in the “Quality Assurance and Control” Article to demonstrate their capabilities and experience on similar Landscape Planting Accessories installations.
C. Material Samples: Submit four (4) sets of physical Material Samples for review of kind, color, pattern, size, and texture for a check of these characteristics with other elements, and for a comparison of these characteristics between Submittal and actual component as delivered and installed. Include the full range of exposed color and texture expected in the completed Work.
Provide Material Samples bound and individually wrapped in re-sealable labeled 1-gallon plastic bags (as applicable):
1. 0.50 cubic foot of Landscape Mulch Material (Shredded Wood Mulch).
2. One (1) two-foot (2’-0”) long section of Tree Root Aeration Unit assembly.
3. One (1) two-foot (2’-0”) long sample of Root Control Barrier.
4. One (1) set of Tree Tying/Staking Materials for each type used, as applicable.
5. One (1) set of Tree Guying Materials for each type used, as applicable.
6. One (1) two-foot (2’-0”) square sample of Erosion Control Material for each type used, as applicable.
7. One (1) two-foot (2’-0”) sample of Landscape Edging Materials and Accessories (stake, etc), to verify gauge, size, and color selected, as applicable.
8. One (1) two-foot (2’-0”) square sample of Weed Control Barrier / Geotextile Filter Fabric for each type used, as applicable.
D. Scaled Shop Drawings: Not Required.
E. Field-Constructed Mock-ups: Not Required.
F. Submittals under this Article will be rejected and returned without the benefit of review by the Landscape Architect if they are difficult to read due to insufficient scale, poor image quality, or poor drafting quality; or if all of the required information is missing or not presented in the format as requested. Partial Submittals will not be accepted.
G. No Work shall proceed under this Section until Submittal requirements indicated herein have been reviewed accordingly by the Landscape Architect.
ADDENDUM 02
South Park Slope and Irrigation Repair LANDSCAPE PLANTING ACCESSORIES CIP - 603 329400 - 3
1.4 QUALITY ASSURANCE AND CONTROL
A. Installer Qualifications:
1. Requirement: Valid California C-27 (Landscaping Contractor) License.
2. Engage an experienced Installer who has completed Landscape Planting Accessories work similar in material, design, and extent to that indicated for this Project and with a record of successful installation.
3. Installer's Field Supervision: Installer shall maintain an experienced full-time supervisor on the Project site during times that installations under this Section are in progress.
B. Observation: Landscape Architect may observe installation of Landscape Planting Accessories at Project Site for compliance with requirements for type, size, and quality. Landscape Architect retains right to observe Landscape Planting Accessories for defects and to reject unsatisfactory or defective material at any time during progress of Work. Contractor shall remove rejected Accessories immediately from Project site.
C. Manufacturer’s Directions: Follow Manufacturer’s directions and drawings in cases where the Manufacturers of articles used in this Section furnish directions covering points not shown in the Contract Drawings and Contract Specifications.
D. Permits, Fees, Bonds, and Inspections: Contractor shall arrange and pay for permits, fees, bonds, testing services, and inspections necessary to perform and complete Work under this Section.
E. Single-Source Responsibility: Obtain each color, type, and variety of products/materials from a single source with resources to provide products/materials of consistent quality in appearance and physical properties without delaying Work.
1.5 DELIVERY, STORAGE, AND HANDLING
A. Provide new, unused materials indicated under this Section. Store and secure properly to prevent theft or damage. Deliver and store perishable material in original, unopened packaging.
It is the responsibility of the Contractor to install “factory condition” Units.
B. Damaged Materials: Be responsible for all damage or disfiguration of Work until Final Acceptance. Remove off site and replace at no additional cost to Owner all damaged or rejected materials.
C. Deliver materials so as to not delay Work, and install only after preparations for installation have been completed.
1.6 COORDINATION, SCHEDULING, AND OBSERVATIONS
A. Utilities: Determine location of above grade and underground utilities and perform Work in a manner which will avoid damage to utilities. Hand excavate, as required. Maintain grade stakes until removal is mutually agreed upon by parties concerned.
ADDENDUM 02
South Park Slope and Irrigation Repair LANDSCAPE PLANTING ACCESSORIES CIP - 603 329400 - 4
B. Excavation: When conditions detrimental to installing Landscape Planting Accessories are encountered, such as rubble fill, adverse drainage conditions, or obstructions, cease installation operations and notify Landscape Architect for further direction.
C. Field Measurements: Contractor shall take field measurements as required. Report major discrepancies between the Contract Drawings and field dimensions to the Landscape Architect prior to commencing Work.
D. Installation: Perform installation of Landscape Planting Accessories only when weather and soil conditions are suitable in accordance with locally accepted practices.
E. Construction Site Observations: Contractor shall request, in writing, at least one (1) week in advance of the time when mandatory site observation(s) by the Landscape Architect are required.
1.7 SUBSTITUTIONS
A. Consideration: Materials to be considered equal to the Materials indicated herein this Section shall be reviewed by the Landscape Architect. Materials with equal performance characteristics produced by other Manufacturer’s and/or Distributors may be considered, providing deviations in dimensional size, color, composition, operation, and/or other characteristics do not change the design concept, aesthetic appearance, nor intended performance, as solely judged by the Landscape Architect. The burden of proof on product equality is on the Contractor.
B. Specific reference to Manufacturer’s names and products specified herein are used as standards of quality. This implies no right to the Contractor to substitute other materials without prior written approval by the Landscape Architect for Work under this Section.
C. Materials substituted and installed by the Contractor, without prior written approval by the Landscape Architect, may be rejected. Contractor shall not be entitled to be compensated by the Owner where the Contractor has installed rejected substitutions without receiving prior written approval.
D. Contract Price: Substituted Materials under this Section shall not increase the Contract price.
1.8 LANDSCAPE ESTABLISHMENT PERIOD
A. Refer to Section 329813 – Landscape Establishment Period, for requirements under this Article.
1. During the duration of the Landscape Establishment Period, continuously maintain Landscape Planting Accessories by tightening, holding plumb, and/or repairing Staking and/or Guying supports, providing adequate depths and coverage requirements of Landscape Mulching Materials, monitoring drainage within Tree Root Aeration Units, hold Edging Materials true and in proper alignments, and other requirements, as required, to establish healthy, viable landscape planting materials until Final Acceptance of Work is granted.
ADDENDUM 02
South Park Slope and Irrigation Repair LANDSCAPE PLANTING ACCESSORIES CIP - 603 329400 - 5
PART 2 - PRODUCTS
2.1 LANDSCAPE MULCH MATERIALS
A. Shredded Wood Mulch: Shredded Wood Mulch, free from deleterious materials, debris, and weed seed. Suitable as a top dressing of trees, shrubs and groundcovers, consisting of following:
1. Type: Shredded cedar, redwood, fir, or hardwood commercial wood bark products, composted with humus and leaf materials. Shredded Wood Mulch shall be graded and to average dimensions of one-inch (1”) to three-inches (3”) in length, and flat in crosssection. a. Minimum organic matter content at 80%.
b. pH between 5.0 and 8.0.
c. Salt content shall be less than 4 millimho/cm @ 25 ˚ C. on a saturated paste extract.
d. Boron content of the saturated extract shall be less than 1.0 parts per million. e. Calcium carbonate shall not be present.
f. Carbon:Nitrogen ratio is less than 100:1.
g. Compost shall be aerobic without malodorous presence of decomposition products. h. Maximum particle size shall be 2 inches. A maximum of 5% shall pass a No. 2 screen.
Maximum Total Permissible Pollutant
Concentrations (in parts per million
(PPM)) on a dry weight basis:
Arsenic 20 ppm
Molybdenum 30 ppm
Cadmium 15 ppm
Nickel 50 ppm
Chromium 150 ppm
Selenium 25 ppm
Cobalt 50 ppm
Silver 10 ppm
Copper 150 ppm
Vanadium 50 ppm
Lead 150 ppm
Zinc 150 ppm
Mercury 10 ppm
2. Coverage Depth:
a. Refer to Part III indicated herein this Section.
ADDENDUM 02
South Park Slope and Irrigation Repair LANDSCAPE PLANTING ACCESSORIES CIP - 603 329400 - 6
3. Products & Manufacturer’s: Subject to compliance with requirements, provide products by one (1) of the following:
a. ES-2 Mulch, Agromin Horticultural Products.
b. Pacific Mulch™, Greenways Environmental.
c. Walk-On Chips, Earthworks Soil Amendments, Inc.
d. Landscape Mulch, Agri Service, Inc.
e. Red Fir Bark, Greenway Compost.
f. A-1 Oak Deco Chips, Hanson Aggregates/A-1 Soils.
g. #SBM 3, Special Mulch #3, Plants Choice, Inc.
h. Or equal, as approved by the Landscape Architect.
2.2 TREE ROOT AERATION UNITS (TREE CHIMNEY’S)
A. General: Tree Root Aeration Units are a complete assembly, consisting of a perforated Aeration Pipe Tube, wrapped in Geo-textile Filter Fabric sleeving, and topped with a Grate.
B. Aeration Pipe Tube: Manufactured from high-density polyethylene (HDPE) resin, meeting ASTM F810. Pipe shall be perforated with machine-drilled holes, set either with 3/8" holes on 4" centers at 120 degrees, or on-half-inch (½") holes on five-inch (5") centers at one-hundredtwenty (120) degrees.
1. Length: As required, per Contract Drawings.
2. Size (Diameter):
a. 3" diameter Pipe.
3. Products & Manufacturer’s: Subject to compliance with requirements, provide products by one (1) of the following:
a. 3000 Triple Wall Drainage Pipe, ADS.
b. Perforated SDR35 Solvent Weld Underdrain Pipe, P.W. Eagle. c. COEX, PSP.
d. Big “O” Drainage Tubing, Armtec.
e. Or equal, as approved by the Landscape Architect.
C. Geo-textile Filter Fabric Sleeving for Aeration Pipe Tube: Meet ASTM D6707. Permeable, lightweight, continuous, non-woven, UV resistant, synthetic geo-textile (nylon or polyester) filament material, engineered to allow water permeability and deter soil permittivity, per ASTM D4491. Fabric shall be non-biodegradable, resistant to acids and alkalis, and sized accordingly.
1. Length: As required, per length of Aeration Pipe.
2. Size: As required, to sleeve (snugly fit) over the diameter of the specified Aeration Pipe tube.
3. Products & Manufacturer’s: Subject to compliance with requirements, provide products by one (1) of the following:
a. Drain Sock, ADS.
b. Drain-Sleeve Filter Fabric, Carriff Corporation.
c. Filter Fabric, Zodiac Fabrics, Inc.
d. Big “O” Sock Filter, Armtec.
e. Drain-Eez, Christy’s.
f. Or equal, as approved by the Landscape Architect.
ADDENDUM 02
South Park Slope and Irrigation Repair LANDSCAPE PLANTING ACCESSORIES CIP - 603 329400 - 7
D. Aeration Pipe Grates (sized accordingly to fit snugly to the specified Aeration Pipe Tube).
1. Shrub and Groundcover Areas: Atrium-type Grate.
a. Products & Manufacturer’s: Subject to compliance with requirements, provide products by one (1) of the following:
1) 3” Atrium Grate #74S (sand color), National Diversified Sales (NDS), Camarillo, CA.
2) Or equal, as approved by the Landscape Architect.
2. Lawn Areas: Flat-type Grate, round in shape.
a. Products & Manufacturer’s: Subject to compliance with requirements, provide products by one (1) of the following:
1) 3” Round Grate #16 (green color), National Diversified Sales (NDS), Camarillo, CA.
2) Or equal, as approved by the Landscape Architect.
2.3 ROOT CONTROL BARRIERS
A. Plastic Root Control Barrier:
1. General: Plastic Root Control Barrier shall be a long-term root control system for trees, fully permeable to oxygen and water to sustain and direct plant growth. Plastic Root Control Barrier shall be manufactured of an extruded, high-impact black homo-polymer (polyethylene or polyolefin) plastic, with minimum 50% post-consumer recycled material, and UV inhibitors. Plastic Root Control Barrier shall be composed of a system consisting of a series of integrally-molded, self-interlocking Barrier Panels. Polystyrenebased plastic is unacceptable. a. Size: Each panel shall be a minimum of twenty-four-inches (24”) in width and thirty-six-inches (36”) in depth, extruded to a mean thickness of minimum .08 inches, with ½” to ¾” raised vertical ribs running perpendicular to the panel and spaced six-inches (6”) on-center. Provide quantity as required of integrated interlocking joint panels, in lengths as required.
b. Products & Manufacturer’s: Subject to compliance with requirements, provide products by one (1) of the following:
1) UB-36-2 Deep Root, Deep Root Partners, San Francisco, CA, 800-458- 7668.
2) Root Solutions, Vespro, Inc., San Rafael, CA, 800-554-0914. 3) Dual Purpose Panels, .085 Thickness, Villa Root Barrier, Inc. Lake Elsinore, CA, 800-654-4067.
4) RP Series Root Barrier Panel, NDS, 800-726-1994.
5) CP Series Root Barrier Panel, Century Products USA, 714-632-7083. 6) Or equal, as approved by the Landscape Architect.
2.4 STAKES AND GUYS
A. Tree Staking Assembly:
1. Wooden Stake Tree Staking Assembly: Complete tree staking Unit, consisting of Lodge Pole Pine Tree Stakes with (choose one: Tree Ties/Tree Straps/Twist Braces) a. Tree Stakes: Lodge Pole Pine Wooden Tree Stake, straight shaft, shaved and cut, cleaned and bare of branches and stubs, free of loose knots, bends, splits, or bows, of uniform thickness, with a minimum diameter of either two-inches (2”) or twoone-half (2-1/2”) to three-inches (3”). Lengths shall be eight-feet (8’), ten-feet
ADDENDUM 02
South Park Slope and Irrigation Repair LANDSCAPE PLANTING ACCESSORIES CIP - 603 329400 - 8
(10’) or twelve-feet (12’), as required, to adequately and firmly penetrate the sub grade and support the tree. Stake shall have a minimum ten-inch (10”) long tapered/conical driving point, and chamfered top to minimize splitting when driven. Stake shall be pressure treated (per Federal Specification TT-W-00571-JTable 2) with an EPA-registered pesticide containing inorganic arsenic (copper chromium arsenate, meeting Federal Specification TT-W-550-Type 1) to protect it from insect attack and decay.
1) Quantity, Size, and Length per tree:
a) 24” box container stock: Two (2) Two-inch (2”) diameter, ten-foot (10’) long or twelve-foot (12’) long (as required) Wooden Tree Stakes per tree.
2) Special Circumstances: Should lengths of Wooden Tree Stakes be inadequate to satisfactorily support the tree being staked in an upright, plumb condition, Contractor shall provide Metal Stake Tree Staking Assembly as indicated herein this Article.
3) Products & Manufacturer’s: Subject to compliance with requirements, provide products by one (1) of the following:
a) Sullivan & Mann Lumber Company, Tustin, CA.
b) BVC Tree Stakes.
c) TruStakes, 4Seasons Wood Products.
d) Or equal, as approved by the Landscape Architect.
b. Tree Straps: Non-stretch, biodegradable cotton, dyed dark-green color, one-inch (1”) wide x eighteen-inches (18”) long, with one-inch (1”) brass grommets at each end. Break strength at 260 lbs. nominal.
1) Quantity, Size, and Length per tree:
a) 24” box container stock and larger: Provide two (2) Tree Straps minimum for each set of Tree Stakes provided.
2) Products & Manufacturer’s: Subject to compliance with requirements, provide products by one (1) of the following:
a) #3718 Biodegradable Original Treestrap®, GCS.
b) Or equal (no known equal).
3) Tree Strap Wire: Smooth, galvanized annealed Steel Wire, 12 gauge.
Provide Wire in adequate lengths to anchor the grommet ends of the Tree Straps to the Tree Stakes.
2.5 EROSION CONTROL MATERIALS
A. Rolled Erosion Control Blanket: 95-100% organic biodegradable materials, consisting of machine-manufactured 100% certified weed free agricultural straw fibers, 100% natural coconut-fibers (coir), or a combination thereof, evenly distributed over the entire area of the Blanket. Fibers shall be sewn into a medium weight natural fiber, degradable mesh net (top and/or bottom) on on-one-half-inch (1-1/2”) centers, with cotton polyester or polypropylene thread. Blanket rolls shall be a minimum of 6’-6” wide, and a minimum of .05 lb./sq. yd.
Provide “U”-shaped, 11-gauge steel wire staples, six-inches (6”) to eight-inches (8”) long, twoinch (2”) crown, to anchor Erosion Control Blankets to soil surface.
1. Products & Manufacturer’s: Subject to compliance with requirements, provide product(s) as required by one (1) Manufacturer, subject to specific slope gradient conditions indicated per the Contract Drawings, as follows:
Slope Product Type * Acceptable Manufacturers and Anticipated
ADDENDUM 02
South Park Slope and Irrigation Repair LANDSCAPE PLANTING ACCESSORIES CIP - 603 329400 - 9
Gradient
Application
and
Composition
Manufacturer’s Product Reference
Numbers
Functional
Longevity
Greenfix of Product
America,
Brawley,
CA
760-351-
7791
North
American
Green,
Evansville,
IN
800-772-2040
Western
Excelsior,
Mancos, CO
800-833-8573
5:1 to 4:1
slopes.
100% Straw;
Single
Organic Net
(Top Only).
#WS05B #S75BN #NAT-SR-1 12 Months
4:1 to 3:1
slopes.
100% Straw;
Double
Organic Net
(Top &
Bottom).
#WS072
B
#S150BN #NAT-SS-2 12 Months
3:1 to 2:1
slopes.
70% Straw +
30%
Coconut
Fibers (Coir);
Double Net
(Top &
Bottom).
#CFS072
B
#SC150BN #NAT-CS-3 18 Months
2:1 to 1:1
slopes, and
greater.
100%
Coconut
Fibers (Coir);
Double Net
(Top &
Bottom).
.
#CF072B #C125BN #NAT-CC-4 24 Months
* or equal, as approved by the Landscape Architect.
2.6 LANDSCAPE EDGINGS
A. Steel Edging/Header:
1. General: Steel Edging/Header shall be in the location and size as shown on the Contract Drawings. Comply with ASTM A569, hot-rolled, standard flexible carbon steel edging, fabricated in sections with stake pockets stamped, punched, or welded to face of sections approximately thirty inches (30”) apart to receive stakes. Steel Edging/Header shall be double-staked at overlap joints, and designed to receive tapered steel stakes. a. Size: 3/16” thick, 6” wide, by 16’-0” length, with six (6) stakes per 16’ section. b. Size: 1/4” thick, 5” wide, by 16’-0” length, with seven (7) stakes per 16’ section. c. Color/Finish: Factory-applied dipped galvanized finish, applied after steel landscape edging is cut to length and stake pockets are stamped, punched or welded. Galvanization shall comply with ASTM A123. Zinc coverage shall be to a standard thickness of 3.3 mil (2.0 oz/ft2).
ADDENDUM 02
South Park Slope and Irrigation Repair LANDSCAPE PLANTING ACCESSORIES CIP - 603 329400 - 10
2. Steel Edging/Header Stakes: Steel, tapered, 15-16” minimum length, finish to match specified Steel Edging/Header. Stakes designed specifically to anchor Steel Edging/Header in place, and manufactured by manufacturer of the Steel Edging/Header for which they will be used.
3. Accessories: Standard tapered ends, corners, and splices, as required.
4. Products & Manufacturer’s: Subject to compliance with requirements, provide products by one (1) of the following:
a. Ryerson & Son, Emeryville, CA.
b. DuraEdge®, J.D. Russell Co., Tucson, AZ.
c. Or equal, as approved by the Landscape Architect.
2.7 WEED CONTROL BARRIER/GEO-TEXTILE FILTER FABRIC
A. Type: Permeable, lightweight, continuous, non-woven, geo-textile polypropylene filament material, UV-resistant, engineered to allow water permeability and deter soil permittivity, per ASTM D4491. Geo-Textile Filter Fabric shall be inert to biological degradation and resistant to naturally encountered chemicals, alkalis and acids. Meet AASHTO M288-96, Class 1.
B. Products & Manufacturer’s: Subject to compliance with requirements, provide products by one (1) of the following:
1. Amoco 4553, Amoco Fabrics and Fibers Company.
2. FX-80HS, Carthage Mills.
3. C-80NW, Contech.
4. 180 EX, Linq.
5. Geotex 801, Propex, Inc.
6. TerraTex N08, Webtec.
7. 180N, TC Mirafi.
8. 3301, Typar Landscape Products.
9. Or equal, as approved by the Landscape Architect.
2.8 MISCELLANEOUS MATERIALS
A. Water: Per ASTM C94, from potable domestic source, and free from deleterious materials such as oils, acids, and organic matter. Transport as required.
B. Stress Reducing Agent: 100% natural organic root and plant stimulator solution, used to eliminate transplant shock and provide better establishment of plants. Solution shall contain a natural wetting agent, designed to improve nutrient release, water-holding capacity, cation exchange capacity in soil, and stimulate fertilizer and micronutrient uptake.
1. Products & Manufacturer’s: Subject to compliance with requirements, provide products by one (1) of the following:
a. Roots NoBurn®, Novozymes Biologicals, Inc., Salem, VA. b. Essential® Plus 1-0-1, Growth Products, White Plains, NY.
2. Application Rate: Provide at prescribed rate and application per Manufacturer’s written recommendations.
C. Wetting Agent and Soil Penetrant (Surfactant): Highly-concentrated liquid solution. Provide in a diluted liquid solution, mixed with water, at the time of watering-in recently planted plant species.
ADDENDUM 02
South Park Slope and Irrigation Repair LANDSCAPE PLANTING ACCESSORIES CIP - 603 329400 - 11
1. Products & Manufacturer’s: Subject to compliance with requirements, provide products by one (1) of the following:
a. Roots NoBurn®, Novozymes Biologicals, Inc., Salem, VA. b. LESCO-Wet™ Plus, Lesco, Inc., Cleveland, OH.
c. Naiad Liquid Wetting Agent, Naiad Company, Inc., Stockton, CA. d. Aqua-Gro L, Scotts Company, Marysville, OH.
e. Sixteen-90, Aquatrols, Cherry Hills, NJ.
f. Or equal, as approved by the Landscape Architect.
2. Application Rate: Provide at prescribed rate and application per Manufacturer’s written recommendations, per one-hundred (100) gallons of water.
D. Plant Vitamin/Hormone Stimulant: Highly-concentrated liquid vitamin solution. Provide in a diluted liquid solution, mixed with water, at the time of watering-in recently planted plant species.
1. Products & Manufacturer’s: Subject to compliance with requirements, provide products by one (1) of the following:
a. SUPERthrive, Vitamin Institute.
b. Roots Concentrate Rooting Stimulant, Novozymes Biologicals, Inc. c. Root-Maxx Plus, Bio-Plex.
d. Or equal, as approved by the Landscape Architect.
2. Application Rate: Provide at prescribed rate and application per Manufacturer’s written recommendations, per one-hundred (100) gallons of water.
E. Herbicides: EPA registered and approved, from the following:
1. Non-Selective Post-Emergent Herbicide: Spray-applied solution containing a minimum of 41% of the active ingredient “glyphosate” (full strength), with a surfactant, mixed with water accordingly per the Manufacturer’s directions.
a. Products & Manufacturer’s: Subject to compliance with requirements, provide products by one (1) of the following:
1) Roundup® PRO, (41% glyphosate), Monsanto Company.
2) Roundup® PROmax (concentrate, 50% glyphosate), Monsanto Company. 3) Honcho® Plus, (41% glyphosate), Monsanto Company.
4) Prosecutor (41% glyphosate), LESCO, Inc.
5) High Yield® Kill-Zall Weed & Grass Killer, (41% glyphosate), Voluntary Purchasing Groups.
6) Or equal, as approved by the Landscape Architect.
b. Application Rate: Provide at prescribed rate and application per Manufacturer’s written recommendations, per one-hundred (100) gallons of water.
2. Selective Pre-Emergent Herbicide (Packaged dry material application): Pre-emergent control of annual grasses and broadleaf weeds in turf grass areas, and woody ornamental trees, shrubs, vines, and groundcover areas.
a. Products & Manufacturer’s: Subject to compliance with requirements, provide products by one (1) of the following:
1) Ronstar® 2G, (granular), Aventis Environmental Science USA. 2) Snapshot® 2.5 GT (granular), (2% trifluralin), Dow AgroSciences LLC. 3) XL*2G, SETRE Chemical Company.
4) Casoron 4G, Chemtura.
5) Treflan® HFP (43% trifluralin), Dow AgroSciences LLC. 6) Treflan® TR-10, (10% Granular trifluralin), Dow AgroSciences LLC. 7) Surflan®, Dow AgroSciences, LLC.
8) Or equal, as approved by the Landscape Architect.
ADDENDUM 02
South Park Slope and Irrigation Repair LANDSCAPE PLANTING ACCESSORIES CIP - 603 329400 - 12
b. Application Rate: Provide at prescribed rate and application per Manufacturer’s written recommendations, per one-hundred (100) gallons of water.
3. Selective Post-Emergent Herbicide: Pre-mixed, flow-able formulation designed for product stability, uniformity in the spray solution and ease of handling. Post-emergent control of annual grasses, nutsedge, and broadleaf weeds in turf, generally with one (1) application.
a. Products & Manufacturer’s: Subject to compliance with requirements, provide products by one (1) of the following:
1) Trimec® Plus, PBI/Gordon Corporation.
2) Three-Way, LESCO, Inc.
3) Or equal, as approved by the Landscape Architect.
b. Application Rate: Provide at prescribed rate and application per Manufacturer’s written recommendations, per one-hundred (100) gallons of water.
PART 3 - EXECUTION
3.1 GENERAL
A. Installation practices of the Landscape Planting Accessories shall be performed during those periods when weather and soil conditions are suitable and in accordance with locally accepted horticultural practice, as approved by the Landscape Architect. Contractor shall notify the Landscape Architect, in writing, on the anticipated commencement date and length of duration of the landscape installation.
B. Examination: Examine areas to receive landscaping for compliance with requirements and for conditions affecting performance of Work of this Section. NO WORK UNDER THIS
SECTION SHALL COMMENCE UNTIL ALL SUBMITTALS UNDER THIS SECTION HAVE BEEN REVIEWED AND APPROVED, IN WRITING. DO NOT PROCEED WITH INSTALLATION UNTIL UNSATISFACTORY CONDITIONS HAVE BEEN CORRECTED.
C. Prior to Work in this Section, Contractor shall examine previously installed Work from other trades and verify that such Work is complete and as required, to the point where the installation of the Landscape Planting Accessories may commence properly.
3.2 PROTECTION OF SITE
A. Contractor shall protect existing and new improvements and systems installed prior to installation of Landscape Planting Accessories. Maintain protection in place until completion of Work and Landscape Establishment Period.
3.3 INSTALLATION OF TREE ROOT AERATION UNITS (TREE CHIMNEY’S) A. General: Tree Root Aeration Unit(s) shall be installed after excavation of planting hole and prior to placement of Amended Planting Backfill Mixture.
ADDENDUM 02
South Park Slope and Irrigation Repair LANDSCAPE PLANTING ACCESSORIES CIP - 603 329400 - 13
B. Upon completion of excavation of planting hole, auger a twelve-inch (12”) diameter hole at the edge of the excavation. Depth shall extend two-feet (2’) beyond the compacted setting layer crown of native planting soil. Remove excess soil.
C. Pipe Installation: Slide Geo-Textile Filter Fabric Sleeve over full length of Perforated Aeration Pipe Tube. Secure open end (as set in bottom of hole) of Filter Fabric Sleeve with a knot or pipe wrap tape. Place assembly Unit plumb, in vertical position, in the bottom of the augered hole. Set the top of the Unit ½” above the finished surface elevation of the mulch layer.
D. Set Plant Material accordingly, and backfill the planting hole with Amended Planting Backfill Mixture, being careful not to provide backfill within the inside of the Tree Root Aeration Unit assembly.
E. Attach Aeration Pipe Grate to top end of the sleeved Aeration Pipe Tube extending above grade.
Provide appropriate Pipe Grate indicated for the application.
F. Quantity Schedule:
1. Provide two (2) Tree Root Aeration Unit assemblies located at opposing sides of the root ball and at opposite ends of the Tree Stakes and/or Deep Watering Bubblers, for each tree sized at 24”-box container and up to but not including a 48”-box container size.
2. Location: Coordinate location of Tree Root Aeration Units to be set equally and in between locations designated to receive deep watering irrigation bubblers, where applicable.
3.4 INSTALLATION OF ROOT CONTROL BARRIERS
A. Plastic Root Control Barrier Panels:
1. Verify the location of underground utilities prior to placement of Root Control Barrier Panels.
2. Excavate sub grade to the required depth of the Panel, and install Panels as an interconnected, linear system, with the ribs of the Panels vertically aligned and facing towards the Plant Material’s root mass.
a. Install Root Control Barrier Panels along the entire perimeter edge for trees located in raised planters (as required).
b. Install Root Control Barrier Panels along the entire perimeter edge of the planting area for trees located in parking lots (as required).
c. Install Root Control Barrier Panels for trees where the tree trunk is located within a minimum of five-feet (5’) of paved surfaces (sidewalks, curbs, plazas, etc). 1) Root Control Barrier Panels shall extend a minimum of ten-feet (10’) from either side of the tree trunk, and follow along the profile of the paved surface being protected. Install Panels at a maximum of four-inches (4”) to six-inches (6”) from the edge of the paved surface.
d. Install Root Control Barrier Panels in specific locations as indicated on the Contract Drawings.
3. Install Root Control Barrier Panels plumb, or if conditions allow, with the top of the Panel slightly inclined towards the root mass. DO NOT install with the top inclined away from the root mass.
a. DO NOT install Root Control Barrier Panels in a circular pattern that encloses the root mass, thus restricting future growth of the Plant Material’s root system.
ADDENDUM 02
South Park Slope and Irrigation Repair LANDSCAPE PLANTING ACCESSORIES CIP - 603 329400 - 14
4. Set top of the Root Control Barrier Panels at the finish graded surface, just below the mulch layer. Install per the requirements of the Manufacturer.
3.5 STAKING AND GUYING
A. General: Tree Staking and Tree Guying shall be per the direction of the Landscape Architect.
Staking and/or guying of trees shall be completed immediately following tree planting operations.
1. Contactor shall provide new Tree Stake or Tree Guy assemblies; reconditioned or previously-used Tree Stake or Tree Guy assemblies shall not be permitted. Provide one (1) set of Tree Staking materials or Tree Guying materials per tree, as required. Trees shall remain plumb and straight from installation through the Contractor Warranty period.
Staking and Guying assemblies shall remain the property of the Owner.
B. Staking/Guying Methodology: Unless otherwise directed on the Contract Drawings or as directed by the Landscape Architect based on field conditions, provide the following Staking/Guying Assemblies, as measured by the size of the tree being supported:
1. 5-gallon size Container Stock to 36”-Box Tree, or for trees up to 3” caliper: Provide Staking Method. Number of stakes per tree shall be as directed herein this Section.
C. Tree Staking Method:
1. Single Tree Stake (Wooden or Metal):
a. Locate Stake at the closest point to the main trunk as possible, yet outside of the root ball and tree branch canopy.
b. Firmly drive the tapered end of the Stake plumb into the undisturbed native subgrade, perpendicular to the side of the prevailing wind, at the minimum depth indicated in the Contract Drawings, or deeper, as required, to firmly support the Stake and minimize any movement of the Stake. Do not damage the tree trunk nor branch canopy, nor penetrate the root ball with the Stake. Do not damage or splinter the Stake. Stake shall not touch the trunk nor branch canopy of the tree.
2. Double Tree Stakes (Wooden or Metal):
a. Locate Stakes at the closest point to the main trunk as possible, yet outside of the root ball and tree branch canopy.
b. Firmly drive the tapered end of one (1) of the Stakes plumb into the undisturbed native sub-grade, perpendicular to the side of the prevailing wind, at the minimum depth indicated in the Contract Drawings, or deeper, as required, to firmly support the Stake and minimize any movement of the Stake. Do not damage the tree trunk or branch canopy, nor penetrate the root ball with the Stake. Do not damage or splinter the Stake.
c. Install the other Stake in similar fashion, directly opposite from the first Stake (180 degrees), and equidistant from the tree trunk.
d. Installed Stakes shall not touch the trunk nor branch canopy of the tree.
3. Tying to Tree Stakes (Wooden or Metal):
a. Tree Straps: Wrap and twist the Tree Strap around the tree trunk, at the lowest point where the tree gains the highest support, per the direction of the Landscape Architect. Secure the Strap with wire; thread the wire through the grommet ends of the Strap and twist wire to secure. Wrap other end of wire around the Stake, twist, and secure it to the Stake. (For Metal Stakes, thread wire through holes drilled through the stake). Repeat for other Stake(s), as required. For trees requiring multiple tree straps, locate additional straps as required along the tree
ADDENDUM 02
South Park Slope and Irrigation Repair LANDSCAPE PLANTING ACCESSORIES CIP - 603 329400 - 15
trunk to provide additional vertical support. Cut off and bend back excessive wire beyond the twists to the Stake(s) to provide a safe condition. The tree shall be supported accordingly to assure a straight, firm position of the tree canopy, yet to allow enough slack to avoid rigid restraint of the tree. b. Once the tree is thoroughly staked, carefully remove the nursery stake(s). Backfill and tamp the nursery stake void(s) with planting soil.
D. Tree Guying: Install guying assembly per the Manufacturer’s latest printed instructions.
3.6 INSTALLATION OF EROSION CONTROL MATERIALS
A. Clear away trash, large stones, and other debris. Prepare sub grade; fine grade area to receive Erosion Control Material, eliminating footprints, tracks, and ruts.
B. Sequences: For hydroseed applications, install the seed slurry prior to installing the Erosion Control Material. In applications where rooted stock is planted on the slope, care shall be exercised to prevent disruption or damage to the underlying material.
C. Unroll Material as close as possible to its intended final position to minimize the need to drag the Material which would dislocate underlying materials or disturb the prepared sub grade or planting. Install Material flush and completely in contact with the ground. Confirm that there is no tension on the Material to minimize soil contact.
D. Overlap Material at a minimum of four-inches (4”) on the sides and eighteen-inches (18”) on the ends. Staples shall be inserted at intervals no greater than three-feet (3’) on-center along overlaps and down the center of each roll length.
E. Joining rolls of the Material shall be installed at the down-channel end of the installed roll, which should overlap the up-channel end of the roll being installed. Overlap should be a minimum of eighteen-inches (18”). Equally set staples on twelve-inch (12”) on-center spacing.
F. Anchor slot at top of slope shall be installed by burying up-channel end in a six-inch (6”) minimum deep trench. Equally set staples on twelve-inch (12”) on-center spacing.
G. On slopes less than six-feet (6’) in height, Material may be installed with roll perpendicular to the contours.
H. The terminal fold shall be installed by bringing the Material down to the level area before terminating. Turn the end under a minimum of six-inches (6”). Equally set staples across the fold at twelve-inch (12”) on-center spacing.
3.7 INSTALLATION OF LANDSCAPE EDGINGS (EDGINGS)
A. General: Install in location(s) in solid undisturbed soil, or in soil set at ninety-percent (90%) relative compaction, at areas as indicated on the Contract Drawings.
1. Horizontal Alignments:
a. Straight Alignments: Where indicated on the Contract Drawings, install Landscape Edgings in straight/angular sections, true to the alignments as indicated, free of “wiggles” or bends, using strings as guides.
ADDENDUM 02
South Park Slope and Irrigation Repair LANDSCAPE PLANTING ACCESSORIES CIP - 603 329400 - 16
b. Curved Alignments: Where indicated on the Contract Drawings, install Landscape Edgings in curved,/radial sections, true to the alignments as indicated, free of “wiggles” or bends, following marked alignments as reviewed in the field by the Landscape Architect.
2. Vertical Alignments: Install parallel to and following along the contoured finished grade.
3. Refer to the Manufacturer’s latest printed instructions and Contract Drawings for requirements of Landscape Edgings/Headers fabricated from metal materials.
3.8 MULCHING
A. General: Mulch backfilled surfaces of pits, trenches, planted areas, and other areas indicated.
B. Shredded Wood Mulch:
1. General: Verify locations to receive Shredded Wood Mulch.
2. Apply the following average thickness of Shredded Wood Mulch, and finish level with adjacent finished surfaces. Do not place Shredded Wood Mulch directly against trunks or stems of Plant Materials. Remove Shredded Wood Mulch that is placed against the growing bases or within the basal nodes of plants.
3. Thickness/Depth: Three-inches (3”), minimum.
4. While settlement and/or decomposition of the Shredded Wood may occur during the duration of the Contract, the Shredded Wood Mulch thickness as indicated shall be consistent throughout the duration of the Contract. The Contractor shall provide additional Shredded Wood Mulch, as needed, and as directed by the Landscape Architect, to maintain the specified constant thickness of the Shredded Wood Mulch, until Acceptance of Work is granted.
3.9 INSTALLATION OF MISCELLANEOUS MATERIALS
A. Anti-Dessicant: Apply using power spray to provide an adequate film over trunks, branches, stems, twigs, and foliage.
1. When deciduous trees or shrubs are moved in full-leaf, spray with anti-desiccant at nursery before moving and again two (2) weeks after planting.
B. Stress Reducing Agent: Apply, as required and directed by the Landscape Architect, per Manufacturer’s latest printed instructions.
C. Wetting Agent & Soil Penetrant: Apply, as required and directed by the Landscape Architect, per Manufacturer’s latest printed instructions.
D. Herbicides: Apply, as required and directed by the Landscape Architect, per Manufacturer’s latest printed instructions.
E. Plant Vitamin/Root Stimulant: Apply, per the Manufacturer’s latest printed instructions. Refer to application requirements per Section 329300 – Exterior Plants.
ADDENDUM 02
South Park Slope and Irrigation Repair LANDSCAPE PLANTING ACCESSORIES CIP - 603 329400 - 17
3.10 CLEAN UP AND PROTECTION
A. For Work under this Section, keep Work area in a clean, orderly, and safe condition. Contractor shall remove trash caused from his Work on a weekly basis throughout the duration of the Work.
B. Protect landscaping from damage due to landscape operations, operations by other Contractors and trades, and trespassers. Maintain protection during installation and landscape establishment periods. Treat, repair, or replace damaged Landscape Planting Accessories as directed.
C. Upon completion of his Work under this Section, the Contractor shall remove rubbish, waste, debris, excess construction materials, and other items resulting from construction operations offsite as described herein this Section and directed by the Landscape Architect.
3.11 FINAL REVIEW
A. Final Review under this Section shall be performed upon completion of the Landscape Establishment Period. (Refer to Section 329813 – Landscape Establishment Period for requirements).
END OF SECTION
1315 Valley Drive, Hermosa Beach, CA 90254 | hermosabeach.gov | HermosaBeachCity HermosaBchCity
Appendix C
Fencing Plan
1315 Valley Drive, Hermosa Beach, CA 90254 | hermosabeach.gov | HermosaBeachCity HermosaBchCity
Appendix D
Irrigation As-Built Plans
CHECKED BY DATE
PROJECT TEAM:
SHEET
SHEET TITLE
CONSULTANT:
STAMP
DRAWN BY PROJECT #
10-17-14
SOUTH PARK, HERMOSA BEACH
LANDSCAPE ARCHITECT
MOORE IACOFANO GOLTSMAN, INC.
CIVIL ENGINEER
HALL & FOREMAN
TEL 714/871-3638
FAX 714/871-1188
www.migcom.com
DAS
OER
SHT OF 16 SHTS
05353.00
8-19-14 90% CD Submittal
10-21-14 Bid Documents
DATE REVISION
IRRIGATION CONSULTANT
WILLIAMS IDC
PRECISE
CONSTRUCTION NOTES GRADING PLAN
DEMOLITION NOTES
GENERAL NOTES
BENCHMARK
C-1
EARTHWORK QUANTITIES:
NET VOLUME: 1,419 CY <IMPORT> 4
CHECKED BY DATE
PROJECT TEAM:
SHEET
SHEET TITLE
CONSULTANT:
STAMP
DRAWN BY PROJECT #
10-17-14
SOUTH PARK, HERMOSA BEACH
LANDSCAPE ARCHITECT
MOORE IACOFANO GOLTSMAN, INC.
CIVIL ENGINEER
HALL & FOREMAN
TEL 714/871-3638
FAX 714/871-1188
www.migcom.com
DAS
OER
SHT OF 16 SHTS
05353.00
8-19-14 90% CD Submittal
10-21-14 Bid Documents
DATE REVISION
IRRIGATION CONSULTANT
WILLIAMS IDC
PRECISE
GRADING PLAN
SIGNING & STRIPING NOTES
GENERAL NOTES
BENCHMARK
CONSTRUCTION NOTES
DEMOLITION NOTES
C-2
EARTHWORK QUANTITIES:
NET VOLUME: 1,419 CY <IMPORT>
STORM DRAIN CONNECTION DETAIL 'A'
NTS
5
0 10' 20' 40'
DATE REVISION
IRRIGATION
PLAN BID DOCUMENTS
LI-1.0
D:\BILL'S FOLDER\DESIGN & CONSULTING\PROJECT\2014\MIG\SOUTH PK., HERMOSA BCH._07-18-14\SHEETS & X-REFS\SOUTH PARK_IRRI.PLAN.DWG ,10/17/2014 4:26 PM,DWG To PDF.pc3,1,ARCH expand D (36.00 x 24.00 Inches) SHT 7 OF 16 SHTS
NORTH
CHECKED BY DATE
PROJECT TEAM:
SHEET
SHEET TITLE
CONSULTANT:
STAMP
DRAWN BY PROJECT #
10-21-14
05353.00
SOUTH PARK, HERMOSA BEACH
LANDSCAPE ARCHITECT
MOORE IACOFANO GOLTSMAN, INC.
TEL 714/871-3638
FAX 714/871-1188
www.migcom.com
8-19-14 90% CD Submittal
10-21-14 Bid Documents
BLW
OJ
CIVIL ENGINEER
HALL & FOREMAN
IRRIGATION CONSULTANT
WILLIAMS IDC MA
AR
LA
HS
PR
MATCH LINE SEE SHEET LI-2.0
BILL L.WILLIAMS
IRRIGATION DESIGN & CONSULTANT
2720 E. WALNUT AVE., ORANGE, CA. 92867
CELL 714-309-9833, FAX 714-997-0344
[email protected]
10 10
10 10
10 10
10 10
10 10
10 10
10 10
10 10
10 10
10 10
10 60. 8 60. 30. 30. 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 0 10' 20' 40'
DATE REVISION
IRRIGATION
PLAN BID DOCUMENT
LI-2.0
D:\BILL'S FOLDER\DESIGN & CONSULTING\PROJECT\2014\MIG\SOUTH PK., HERMOSA BCH._07-18-14\SHEETS & X-REFS\SOUTH PARK_IRRI.PLAN.DWG ,10/17/2014 4:27 PM,DWG To PDF.pc3,1,ARCH expand D (36.00 x 24.00 Inches) SHT 8 OF 16 SHTS
NORTH
CHECKED BY DATE
PROJECT TEAM:
SHEET
SHEET TITLE
CONSULTANT:
STAMP
DRAWN BY PROJECT #
10-21-14
05353.00
SOUTH PARK, HERMOSA BEACH
LANDSCAPE ARCHITECT
MOORE IACOFANO GOLTSMAN, INC.
TEL 714/871-3638
FAX 714/871-1188
www.migcom.com
8-19-14 90% CD Submittal
10-21-14 Bid Documents
BLW
OJ
CIVIL ENGINEER
HALL & FOREMAN
IRRIGATION CONSULTANT
WILLIAMS IDC
MATCH LINE SEE SHEET LI-1.0
BILL L.WILLIAMS
IRRIGATION DESIGN & CONSULTANT
2720 E. WALNUT AVE., ORANGE, CA. 92867
CELL 714-309-9833, FAX 714-997-0344
[email protected]
•• •••••••
CHECKED BY DATE
PROJECT TEAM:
SHEET
SHEET TITLE
CONSULTANT:
STAMP
DRAWN BY PROJECT #
10-21-14
05353.00
SOUTH PARK, HERMOSA BEACH
LANDSCAPE ARCHITECT
MOORE IACOFANO GOLTSMAN, INC.
TEL 714/871-3638
FAX 714/871-1188
www.migcom.com
8-19-14 90% CD Submittal
10-21-14 Bid Documents
BLW
OJ
CIVIL ENGINEER
HALL & FOREMAN
IRRIGATION CONSULTANT
WILLIAMS IDC
DATE REVISION
IRRIGATION
NOTES BID DOCUMENTS
LI-3.0
D:\BILL'S FOLDER\DESIGN & CONSULTING\PROJECT\2014\MIG\SOUTH PK., HERMOSA BCH._07-18-14\SHEETS & X-REFS\SOUTH PARK_DETAIL PLAN.DWG SHT 9 OF 16 SHTS
,10/17/2014 4:28 PM,DWG To PDF.pc3,1,ARCH expand D (36.00 x 24.00 Inches)
CHECKED BY DATE
PROJECT TEAM:
SHEET
SHEET TITLE
CONSULTANT:
STAMP
DRAWN BY PROJECT #
10-17-14
SOUTH PARK, HERMOSA BEACH
LANDSCAPE ARCHITECT
MOORE IACOFANO GOLTSMAN, INC.
CIVIL ENGINEER
HALL & FOREMAN
TEL 714/871-3638
FAX 714/871-1188
www.migcom.com
DAS
OER
SHT OF 16 SHTS
05353.00
8-19-14 90% CD Submittal
10-21-14 Bid Documents
DATE REVISION
IRRIGATION CONSULTANT
WILLIAMS IDC
1 ACCESSIBILITY PARKING STALL 2 ACCESSIBILITY SIGN 3 4
5 CONCRETE WHEELSTOP
INTERNATIONAL SYMBOL OF
ACCESSIBILITY MARKING
TOW-AWAY SIGN
6 SQUARE DRAINAGE INLET 6 ATRIUM DRAINAGE INLET
10 RETAINING WALL
CIVIL
CONSTRUCTION
DETAILS
7 LIGHT POLE FOUNDATION 8 THICKENED EDGE SIDEWALK
C-3
11 9 DEEPENED CURB
A BACKFLOW NO SCALE B BALL VALVE NO SCALE G 12" SHRUB POP-UP HEAD NO SCALE C GATE VALVE NO SCALE F QUICK COUPLING VALVE NO SCALE I MULTI OUTLET EMITTER NO SCALE E EMITTER R.C.V. NO SCALE O EMITTER SUB HEADER NO SCALE K SOAKER LINE LAYOUT NO SCALE N DRIP LINE LAYOUT ON SLOPE NO SCALE M DRIP LINE CONNECTION NO SCALE P FLUSH VALVE NO SCALE L EMITTER AIR/VACUUM RELIEF NO SCALE H 2" & 4" POP-UP HEAD NO SCALE D REMOTE CONTROL VALVE NO SCALE
CHECKED BY DATE
PROJECT TEAM:
SHEET
SHEET TITLE
CONSULTANT:
STAMP
DRAWN BY PROJECT #
10-21-14
05353.00
SOUTH PARK, HERMOSA BEACH
LANDSCAPE ARCHITECT
MOORE IACOFANO GOLTSMAN, INC.
TEL 714/871-3638
FAX 714/871-1188
www.migcom.com
8-19-14 90% CD Submittal
10-21-14 Bid Documents
BLW
OJ
CIVIL ENGINEER
HALL & FOREMAN
IRRIGATION CONSULTANT
WILLIAMS IDC
DATE REVISION
IRRIGATION
DETAILS BID DOCUMENTS
LI-4.0
D:\BILL'S FOLDER\DESIGN & CONSULTING\PROJECT\2014\MIG\SOUTH PK., HERMOSA BCH._07-18-14\SHEETS & X-REFS\SOUTH PARK_DETAIL PLAN.DWG SHT 12 OF 16 SHTS
,10/17/2014 4:28 PM,DWG To PDF.pc3,1,ARCH expand D (36.00 x 24.00 Inches)
A SLEEVE UNDER A.C. NO SCALE G FLUSH VALVE NO SCALE C BUBBLE HEADS ON SLOPE NO SCALE F VALVE MANIFOLD DETAIL NO SCALE I PRESSURE RELIEF VALVE NO SCALE E CONDUIT SIZING CHART NO SCALE K WATER FEATURE PEDESTAL NO SCALE L A NO SCALE H AIR RELEASE VALVE NO SCALE D TRENCHING DETAIL NO SCALE
CHECKED BY DATE
PROJECT TEAM:
SHEET
SHEET TITLE
CONSULTANT:
STAMP
DRAWN BY PROJECT #
10-21-14
05353.00
SOUTH PARK, HERMOSA BEACH
LANDSCAPE ARCHITECT
MOORE IACOFANO GOLTSMAN, INC.
TEL 714/871-3638
FAX 714/871-1188
www.migcom.com
8-19-14 90% CD Submittal
10-21-14 Bid Documents
BLW
OJ
CIVIL ENGINEER
HALL & FOREMAN
IRRIGATION CONSULTANT
WILLIAMS IDC
DATE REVISION
IRRIGATION
DETAILS BID DOCUMENTS
LI-5.0
D:\BILL'S FOLDER\DESIGN & CONSULTING\PROJECT\2014\MIG\SOUTH PK., HERMOSA BCH._07-18-14\SHEETS & X-REFS\SOUTH PARK_DETAIL PLAN.DWG SHT 13 OF 16 SHTS
,10/17/2014 4:28 PM,DWG To PDF.pc3,1,ARCH expand D (36.00 x 24.00 Inches)
1315 Valley Drive, Hermosa Beach, CA 90254 | hermosabeach.gov | HermosaBeachCity HermosaBchCity
Appendix E
Updated Bid Schedule
18 B. BID SCHEDULE
CIP NO. 603 South Park Slopes & Irrigation Repairs
Item
No.
Estimated
Quantity
Unit Description of Work Payment
Reference
Unit
Price Total
1 1 LS
Mobilization and Demobilization
(5% max. of total bid schedule
cost)
7-3.4
- $
2 26,598 SF
Demo and remove existing
irrigation system, shrubs and
groundcovers and protect in
place all existing trees
7-4.6
- $
3 605 SF
Demo and remove existing
irrigation and planting for
installation of new stabilized
decomposed granite
7-4.6
- $
4 253 SF
Demo and remove existing
irrigation and planting for
installation of new cast in place
concrete
7-4.6
- $
5 1 LS Install Temporary Construction
Fence
7-4.5 - $
6 6 EA
Existing bench to be salvaged,
protected and stored outside of
planting area and re-installed on
new concrete pad
7-4.9
- $
7 1 LS Install New Irrigation System 7-4.7 - $
8 253 SF Construct Cast in Place Concrete
Paving
7-4.8 - $
9 605 SF Install stabilized decomposed
granite
7-4.10 - $
10 37 LF Install steel header 7-4.13 - $
11 17 LF Construct CMU block site wall
with precast concrete cap.
7-4.14 - $
12 1 LS Relocating and Setting Boulders
- Greater than or equal to 24”
7-4.15 - $
12.1 20 EA Relocating and Setting -
Boulders 12”-24”
7-4.15.1 - $
19 (Total Bid in Figures)
______ _____________
(Total Bid in Words)
_______ _____________
Contractor Name:
Item
No.
Estimated
Quantity
Unit Description of Work Payment
Reference
Unit
Price Total
12.2 60 EA Relocating and Setting -
Boulders less than 12” wide
7-4.15.2 - $
13 250 CY Install wood landscape mulch
(3” depth)
7-4.22 - $
14 28 EA
Repair timber steps replacing
existing soil infill with stabilized
decomposed granite
7-4.16
- $
15 1 LS
Concrete in place all loose
boulders within play area.
Quantity to be verified in field.
7-4.15
- $
16 2 EA Install 24” Box Tree 7-4.17 - $
17 1,106 EA Install 1 Gallon Shrub 7-4.18 - $
19 1,761 EA Install 5 Gallon Shrub 7-4.19 - $
20 140 EA Install 15 Gallon Shrub 7-4.20 - $
21 4,432 SF Install Turf-Sod 7-4.21 - $
22 1 LS Landscape Establishment Period 7-4.23 - $
20 (Total Bid in Figures)
______
(Total Bid in Words)
Contractor Name:
______
In case of any discrepancy between the words and the figures, the words shall prevail. If the unit price and the total amount for any item are not in agreement, the unit price alone shall be considered to represent the Bidder’s intention and all totals will be corrected to conform thereto. Attached hereto is cash, a certified check, a cashier's check, or a Bidder's bond in the amount of
__________________________________________________Dollars, said amount being not less than ten (10) percent of the amount bid. It is agreed a portion equal to the difference between the low bid and second low bid shall be retained as liquidated damages by the City if the undersigned fails or refuses to execute the Contract and furnish the required bonds and certificates of insurance within the time provided.
Contractor Signature: __________________________________________ PW Registration #: __________________________________________ State License #: __________________________________________ Contractor Company Name: __________________________________________
1315 Valley Drive, Hermosa Beach, CA 90254 | hermosabeach.gov | HermosaBeachCity HermosaBchCity
Appendix F
Updated Special Provisions
SP-1
CIP No. 603
SOUTH PARK SLOPES AND IRRIGATION REPAIRS
VI. SPECIAL PROVISIONS
The following Special Provisions supplement and amend the 2021 Standard Specifications for Public Works Construction (SSPWC). These Special Provisions have been arranged into a format and sequence that parallels the Standard Specifications for Public Works Construction.
SP-2
TABLE OF CONTENTS
PART 1 – GENERAL PROVISIONS…………………………………………………… SP-4
PREFACE: STANDARD SPECIFICATIONS AND STANDARD DRAWINGS……SP-4 SECTION 1 – GENERAL……………………………………………………………….SP-4
1-2 TERMS AND DEFINITIONS………………………………………………………..SP-4
SECTION 2 – SCOPE OF THE WORK………………………………………………..SP-4
2-2 PERMITS. ............................................................................................................... SP-4 2-5 THE CONTRACTOR’S EQUIPMENT AND FACILITIES. ............................... SP-5 2-5.5 Contractor’s Responsibility for Work. ................................................................. SP-5 2-5.6 Notice and Service Thereof. ................................................................................ SP-5 2-11 RETENTION OF IMPERFEFCT WORK. ........................................................... SP-6 SECTION 3 – CONTROL OF THE WORK. .....................................................................SP-6 3-6 THE CONTRACTOR’S REPRESENTATTIVE. .................................................. SP-6 3-7 CONTRACT DOCUMENT. ................................................................................... SP-7 3-8 SUBMIITALS. ......................................................................................................... SP-7 3-13 COMPLETION, ACCEPTANCE, AND WARRANTY. ........................................ SP-8 SECTION 5 - LEGAL RELATIONS AND RESPONSIBILITIES. .................................SP-9 5-3 LABOR..................................................................................................................... SP-9 5-4 INSURANCE. .......................................................................................................... SP-9 5-7 SAFETY. ................................................................................................................ SP-10 5-8 LAWS TO BE OBSERVED. ................................................................................. SP-11 5-9 FAIR EMPLOYMENT PRACTICE COMMISSION CERTIFICATION. ........ SP-13 SECTION 6 – PROSECTION AND PROGRESS OF THE WORK. .............................SP-13 6-1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF THE WORK.SP-13 6-9 LIQUIDATED DAMAGES. ................................................................................. SP-15 SECTION 7 – MEASUREMENT AND PAYMENT. ......................................................SP-15 7-3 PAYMENT. ............................................................................................................ SP-15 PART 2 – CONSTRUCTION MATERIALS ......................................................................SP-27 SECTION 201 – CONCRETE, MORTAR, AND RELATED MATERIALS................SP-27 201-1 PORTLAND CEMENT CONCRETE. .............................................................. SP-27 PART 3 – CONSTRUCTION METHODS..........................................................................SP-28 SECTION 300 – EARTHWORK. .....................................................................................SP-28 300-1 CLEARING AND GRUBBING. ....................................................................... SP-28 PART 4 – EXISTING IMPROVEMENTS..........................................................................SP-29 SECTION 400 – PROTECTION AND RESTORATION. ..............................................SP-29 400-4 TREES. ............................................................................................................... SP-29 PART 8 – LANDSCAPING AND IRRIGATION...............................................................SP-29 SECTION 800 – MATERIALS. .........................................................................................SP-29 800-1 LANDSCAPING MATERIALS. ....................................................................... SP-29
SP-3
800-1.1 Topsoil. ............................................................................................................. SP-29 800-1.4.2 Trees. ................................................................................................................ SP-29 800-1.4.2.1 DELIVERY, STORAGE, AND HANDLING OF TREES .......................... SP-29 SECTION 801 – INSTALLATION. ..................................................................................SP-31 801-2 EARTHWORK AND TOPSOIL PLACEMENT. ............................................. SP-31 801-2.1 General. ............................................................................................................ SP-31 801-4 PLANTING. ....................................................................................................... SP-31 801-4.5 Tree and Shrub Planting. ................................................................................ SP-31 PART 9 – SPECIFIC CONDITIONS………………………………………………….SP- 32
SECTION 900 – WORK AREA………………………………………………………..SP-32
900-1.1 Park Access………………………………………………………………… SP-32
900-1.2 Contractor Laydown and Storage Area………………………………………… SP-32
SECTION 901 – CONSTRUCTION MANAGEMENT SOFTWARE ........................SP-32 901-1.1 Procore Software .............................................................................................. SP-32 EXHIBIT “A”- SCHEDULE OF PERFORMANCE ………………………………...SP-33 EXHIBIT “B”- SOLID WASTE REPORTING………………………………………SP-34
EXHIBIT “C”- CONSTRUCTION NOTICE TEMPLATE…………………………SP-36 EXHIBIT “D”- HAUL ROUTES …………………………………………………….. SP-37
SP-4
PART 1 – GENERAL PROVISIONS
PREFACE: STANDARD SPECIFICATIONS AND STANDARD DRAWINGS
The Standard Specifications for Public Works Construction (SSPWC), written and promulgated by the Southern California Chapter of the American Public Works Association and the Southern California Districts of the Associated General Contractors of California, shall be the Standard Specifications of the City. All work shall conform to the edition indicated in this document and in the bid proposal documents, including supplements, of the SSPWC, these Special Provisions which supplement or modify the SSWPC, the Standard Plans for Public Works Construction (SPPWC) of the same edition as the SSPWC, and the Standard Drawings as issued by the City available at the time bids are opened unless otherwise specified in the Contract Documents.
The above referenced Standard Specifications, Special Provisions and Standard Drawings are hereby made a part of the Contract Documents.
SECTION 1 – GENERAL.
1-2 TERMS AND DEFINITIONS.
Whenever the following terms are used in the SSPWC, they shall be understood to mean and refer to the following:
a) Board – The City Council of the City of Hermosa Beach b) Contract Documents – Documents including but not limited to the proposal forms, Special Provisions, Bonds, Insurance, Contract, and all Addenda setting forth any modifications to the documents.
c) Engineer – The City Engineer or his/her authorized representative d) Bidder – An individual, co-partnership, association, or corporation submitting a proposal for the work contemplated, acting directly or through a duly authorized representative. e) Legal Address of Contractor – The address given on the Contractor’s bid and is hereby designated as the place to which all notices, letters or other communications to the Contractor shall be mailed or delivered.
SECTION 2 – SCOPE OF THE WORK.
2-2 PERMITS.
Add the following:
Prior to beginning work, the Contractor shall obtain authorization and permits from the City of Hermosa Beach. The Contractor will be responsible to protect and preserve all property and improvements in accordance with the Contract Documents.
The Contractor must have or obtain a valid City of Hermosa Beach Business License in accordance with the provisions of the Hermosa Beach Municipal Code.
SP-5
City Right of Way Permit
A City Right of Way Permit is required to work within public right-of-way and will be issued at no cost to the Contractor.
Right of Way Permits
When work occurs in the right-of-way of other entities, the Contractor shall obtain a no fee right of way permit as required for an encroachment from that entity. 2-5 THE CONTRACTOR’S EQUIPMENT AND FACILITIES.
2-5.4 Haul Routes.
Replace the entire subsection with the following:
Hall Routes shall be per the City of Hermosa Beach Truck Routes map. See Exhibit “D”.
Add the following subsections:
2-5.5 Contractor’s Responsibility for Work.
Until the formal acceptance of the work by the City, the Contractor shall have the charge and care thereof and shall, subject to the insurance protection furnished, bear the risk of accident, loss or damage to any part thereof by action of the elements or from any other cause, whether arising from the execution or from the non-execution of the work. The Contractor shall rebuild, repair, restore and otherwise correct damages to any portion of the work occasioned by any of the above causes before its acceptance.
In case of suspension of work from any cause whatever, the Contractor shall be responsible for all materials and the proper temporary storage thereof. 2-5.6 Notice and Service Thereof.
Any notice required or given by one party to the other under the Contract shall be in writing and shall be dated and signed by the party giving such notice or by a duly authorized representative of such party. Any such notice shall not be effective for any purpose whatever unless served in the following manner:
Notice shall be given to the City by personal delivery thereof to the City’s Engineer or by depositing the same in the United States mail enclosed in a sealed envelope, registered and with postage prepaid, addressed to:
Public Works Department
City of Hermosa Beach
1315 Valley Dr.
Hermosa Beach, CA 90254
Notice shall be given to the Contractor by personal delivery thereof to said Contractor or to his authorized representative at the site of the project, or by depositing the same in the United States mail, enclosed in a sealed envelope addressed to said Contractor at the address established for the conduct of the work under this Contract, postage prepaid and registered.
Notice shall be given to the Surety, or any other person, by personal delivery to said Surety or
SP-6
other person, or by depositing the same in the United States Mail, enclosed in a sealed envelope addressed to such Surety or persons at the address of said Surety or persons last communicated to the party giving the notice, postage prepaid and registered. 2-5.7 Warranty of Title.
No materials, supplies, or equipment for the work under this Contract shall be purchased subject to any chattel mortgage or under a conditional sale Contract or other agreement by which an interest therein or any part thereof is retained by the seller or supplier. The Contractor warrants clear and good title to all materials, supplies, and equipment installed and incorporated in the work, and agrees upon completion of all work to deliver the premises, together with all improvements and appurtenances constructed or placed thereon by them to the City free from any claims, liens, encumbrances, or charges, and further agrees that neither they nor any person, firm, or corporation furnishing any material or labor for work covered by the Contract shall have any right to a lien upon the premises or any improvement or appurtenance thereon; provided, that this shall not preclude the Contractor from installing metering devices or other equipment of utility companies the title of which is commonly retained by the utility company.
Nothing contained in this section, however, shall defeat or impair the right of such persons furnishing materials or labor under any bond given by the Contractor for their protection, or any right under any law permitting such persons to look to funds due the Contractor, which are in the hands of the City.
2-11 RETENTION OF IMPERFEFCT WORK.
If any portion of the work done or materials furnished under the Contract proves defective or not in accordance with the specifications and Contract drawings, and if the imperfection in the same is not of sufficient magnitude or importance to make the work dangerous or undesirable, or if the removal of such work is impracticable or will create conditions which are dangerous or undesirable in the opinion of the Engineer, the Engineer shall have the right and authority to retain the work instead of requiring it to be removed and reconstructed, but he shall make such deductions therefor in the payment due the Contractor as may be just and reasonable.
SECTION 3 – CONTROL OF THE WORK.
3-6 THE CONTRACTOR’S REPRESENTATTIVE.
Add the following:
The Contractor shall provide the Engineer with the name, address, and business and home telephone numbers of the person responsible for the maintenance of barricades, traffic control signs, lights and other safety devices.
SP-7
3-7 CONTRACT DOCUMENT.
3-7.2 Precedence of Contract Documents.
Replace the entire subsection with the following:
If there is a conflict between any of the Contract Documents, the document highest in the order of precedence shall control. The order of precedence, from highest to lowest, shall be as follows:
1. Requirements of law, including the Code and Ordinances of the City of Hermosa Beach.
2. Permits from other agencies as may be required by law.
3. Permits from City of Hermosa Beach Departments as may be required by law or ordinance.
4. The Contract.
5. The Bid Proposal.
6. Addenda.
7. Notice Inviting Bids.
8. Instructions to Bidders.
9. Special and General Provisions.
10. Plans.
11. City of Hermosa Beach Standard Plans.
12. Other Standard Plans.
13. Standard Specifications for Public Works Construction.
14. Reference Specifications.
Change orders, supplemental agreements, and approved revisions to Plans and Specifications will take precedence over documents listed above, except those listed as FIRST, SECOND, and THIRD. Detailed plans shall have precedence over general plans. 3-8 SUBMIITALS.
3-8.1 General.
Add the following:
The Contractor shall submit the following submittals within ten (10) days of notification of the City’s intent to award this Contract:
Project Construction Schedule, sequence, and phase sequence plan Preconstruction video on USB, 2 copies
Copy of City Business License (Prime and Subcontractors)
SP-8
24 Hr. Emergency Phone Call List
Letters identifying site authorized Contractor’s representative or “Superintendent” and Contractor’s “Competent Person”
Vehicular and Pedestrian Traffic Control Plan (paper and PDF) WPCP / Best Management Practices
Asphalt Concrete material specifications and mix design Concrete material specifications and mix design
Crushed Miscellaneous Base material specifications
Topsoil material specifications
Detectable Warning System/Truncated Domes for access ramps o One (1) ADA tile sample, minimum 6” x 6”
o Shop drawings for access ramp products showing fabrication details, composite structural system, tile surface profile, sound on cane amplification feature, plans showing tile placement including joints, and material to be used as well as outlining installation materials and procedure
Constructions Notices sample template shall be provided by the City to the Contractor and modified and submitted to the engineer for review and approval. Approved Construction Notice shall be distributed by Contactor. See Exhibit C Others as requested by the Engineer
3-13 COMPLETION, ACCEPTANCE, AND WARRANTY.
Add the following subsection:
3-13.4 Completion and Acceptance.
In addition to the guarantees as required in Section 2-4 of the Standard Specifications, the Faithful Performance Bond shall remain in full force and effect for a period of one year after acceptance of the work by the City to insure that defects, which appear within said period, will be repaired, replaced, or corrected by the Contractor, at its own cost and expense, to the satisfaction of the Engineer within thirty (30) days of written notice thereof by the City.
SP-9
SECTION 5 - LEGAL RELATIONS AND RESPONSIBILITIES.
5-3 LABOR.
Add the following subsection:
5-3.6 Laws.
Each Bidder must submit with the Bid Proposal a fully executed Certificate of NonDiscrimination by Contractors. Bids will not be considered unless accompanied by the completed Certificate.
After the opening of bids and the determination of the low Bidder, said low Bidder shall submit to the Public Works Department, no later than 5:00 P.M. on the third working day following the bid opening, a completed “Fair Employment Practices Contractor Compliance Report”.
The Contractor shall comply with all applicable provisions of Sections 1776, 1777.5 and 1777.7 of the C a l i f o r n i a L a b o r Code. The Contractor shall be responsible for compliance with Section 1776 and shall insert a provision in all subcontracts requiring subcontractors to comply with said section.
The Contractor is prohibited from performing work on this project with a subcontractor who is ineligible to perform work on the project pursuant to Section 1777.1 or 1777.7 of the Labor Code. 5-4 INSURANCE.
Replace the entire subsection with the following:
The Contractor shall, at its expense, maintain in effect all times during the performance of work under the Contract not less than the following coverage and limits of insurance, which shall be maintained with insurers licensed to sell insurance in the State of California and having a “A-“or higher rating in the latest edition of Best’s Insurance Guide, and shall be subject to approval by the City’s Risk Manager:
Workers’ Compensation and Employer’s Liability
Workers’ Compensation – coverage as required by law
Employer’s Liability – limits of at least $1,000,000 per occurrence Comprehensive General Liability
Combined Single Limit - $5,000,000
Automobile Liability
Combined Single Limit - $5,000,000
All of the Contractor’s policies shall contain an endorsement providing written notice shall be given to the City at least 30 calendar days prior to termination, cancellation or reduction of coverage in the policy
The Bodily Injury and Property Damage Liability policies shall contain the following:
1. An endorsement extending coverage to the City as an insured, in the same
SP-10
manner as the named insured as respects liabilities arising out of the performance of any work under the Contract. Such insurance shall be primary insurance as respects the interest of the City, and any other insurance maintained by the City shall be excess and not contributing insurance with the insurance required hereunder.
2. “Severability of Interest” clause.
3. Elimination of any exclusion regarding loss or damage to property caused by explosion or resulting from collapse of buildings or structures or damage to property underground, commonly referred to by insurers as the “XCU” hazards.
4. Provision or endorsement stating that such insurance, subject to all of its other terms and conditions, applies to the liability assumed by the Contractor under the Contract.
Promptly on execution of the Contract, and prior to commencement of any work, the Contractor shall deliver to the City copies of all required policies and endorsements thereto on the forms supplied by the City.
The Contractor shall require and verify similar insurance on the part of its subcontractors.
The foregoing requirements as to the types, limits and City approval of insurance coverage to be maintained by the Contractor are not intended to and shall not in any manner limit or qualify the liabilities and obligation assumed by the Contractor under the Contract.
Any policy or policies of insurance that the Contractor or his Subcontractors elects to carry as insurance against loss or damage to their construction equipment and tools or other personal property used in fulfillment of this Contract shall include a provision waiving the insurer’s right of subrogation against the City.
The cost of all insurance shall be included in the Contractor’s bid. 5-7 SAFETY.
Add the following subsection:
5-7.9 Emergency Provisions.
Unusual conditions may arise on the work which will require that immediate and unusual provision be made to protect the public from danger or loss or damage to life and property, due directly or indirectly to the prosecution of the work, and it is part of the service required of the Contractor to make such provisions and to furnish such protection.
Whenever, in the opinion of the City, an emergency exists of which the City is aware and against which the Contractor has not taken sufficient precaution for the safety of the public or the protection of utilities or of adjacent structures or property which may be injured by the progress of construction; and whenever, in the opinion of the City, immediate action shall be considered necessary in order to protect public or private personnel or property interests, or prevent likely loss of human life or damage on account of the operations under the Contract, then in that event the City may provide suitable protection to said interests by causing such work to be done and material to be furnished, as in the opinion of the City may seem reasonable and necessary, all at the expense of the Contractor.
Add the following subsections:
SP-11
5-8 LAWS TO BE OBSERVED.
5-8.1 Laws and Regulations.
The Contractor shall keep himself fully informed of all Federal and State laws, County and City ordinances and regulations which, in any manner, affect those engaged or employed on the work, the materials used in the work or the conduct of the work. If any discrepancy or inconsistency should be discovered in this Contract or in the Plans or Specifications herein referred to, in relation to any such law, ordinance or regulation, the Contractor shall forthwith report the same in writing to the Engineer. The Contractor shall, at all times, observe and comply with and shall cause all his agents and employees to observe and comply with all such applicable laws, ordinances and regulations in effect or which may become effective before completion of this Contract. He shall protect and indemnify the City and its officers and agents against any claim or liability arising from or based on the violations of any such laws, ordinances or regulations whether by himself or by his employees or his subcontractors or their employees.
Except as otherwise explicitly provided in these Specifications, all permits and licenses necessary to the prosecution of the work shall be secured by the Contractor at his own expense and he shall pay all taxes properly assessed against his equipment or property used or required in connection with the work.
All state laws, all county and city ordinances and regulations now imposed by competent authority and relating to any materials required to be furnished under these specifications and works required to be done hereunder, shall be deemed to be and hereby are made controlling and part of these specifications.
5-8.2 General.
The Contractor shall keep himself fully informed of all existing state and national laws and municipal ordinances and regulations which in any manner affect those engaged or employed in the work, or the materials used in the work or which in any way affect the conduct of the work and of all such orders and decrees of bodies or tribunals having any jurisdiction or authority over the same.
5-8.3 Eight-Hour Law.
Eight (8) hours labor constitutes a legal day's work. The Contractor shall forfeit as a penalty $25.00 (Twenty-five dollars) for each workman employed in the execution of the Contract by the Contractor or any subcontractor under him for each calendar day during which such workman is required or permitted to work more than eight (8) hours in any one calendar day and forty (40) hours in any one calendar week in violation of the provisions of the Labor Code and in particular, Section 1810 to Section 1815 thereof inclusive except that work performed by employees of Contractors in excess of eight (8) hours per day and forty (40) hours during any one week, shall be compensated at not less than one and one-half (1 1/2) times the basic rate of pay as provided in Section 1815.
SP-12
5-8.4 Prevailing Rate of Per Diem Wages.
Pursuant to the provisions of Section 1773 of the Labor Code, the general prevailing wage rates in the County in which the work is to be done have been determined by the Director of the California Department of Industrial Relations. These wages are set forth in the General Prevailing Wage Rates. Future effective general prevailing wage rates which have been predetermined and are on file with the California Department of Industrial Relations are referenced but not printed in the general prevailing wage rates.
The U.S. Department of Transportation (DOT) provides a toll-free “hotline” service to report bid rigging activities. Bid rigging activities can be reported Mondays through Fridays, between 8:00 a.m. and 5:00 p.m., eastern time, Telephone No. 1-800-424-9071. Anyone with knowledge of possible bid, Bidder collusion, or other fraudulent activities should use the “hotline” to report these activities. The “hotline” is part of the DOT’s continuing effort to identify and investigate highway construction Contract fraud and abuse and is operated under the direction of the DOT Inspector General. All information with be treated confidentially and caller anonymity will be respected.
The Contractor shall comply with Labor Code Section 1775. In accordance with said section, the Contractor shall forfeit as a penalty to the City $50.00 (fifty dollars) for each calendar day, or portion thereof, for each workman paid less than the stipulated prevailing rates for such work or craft in which such workman is employed for any work done under the Contract by him or by `any subcontractor under him in violation of the provisions of the Labor Code and in particular Labor Code Sections 1770 to 1780, inclusive. In addition to said penalty and pursuant to said Section 1775, the difference between such stipulated prevailing wage rates and the amount paid to each workman for each calendar day or portion thereof for which each workman was paid less than the stipulated prevailing wage rate shall be paid to each workman by the Contractor. 5-8.5 Certified Payroll.
Pursuant to Section 1776 of the Labor Code, the Contractor and/or subcontractors shall submit weekly to the City for each week in which any Contract work is performed a certified copy of all payroll records. Should the Contractor fail to provide such payroll certificates, the City may withhold.
$1,000.00 for each weekly payroll certificate not received from payment due. 5-9 FAIR EMPLOYMENT PRACTICE COMMISSION CERTIFICATION.
The Contractor's attention is directed to the requirements in Section 12990 of the Government Code for nondiscrimination and compliance employment programs.
SECTION 6 – PROSECTION AND PROGRESS OF THE WORK.
6-1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF THE
WORK.
6-1.1 Construction Schedule.
SP-13
Add the following:
The Contractor’s proposed construction schedule shall be submitted to the Engineer within ten (10) working days after the date of the Notice of Contract Approval. The schedule shall be supported by written statements from each supplier of materials or equipment indicating that all orders have been placed and acknowledged, and setting forth the dates that each item will be delivered.
In preparation of the construction schedule, the following items shall be considered:
The City observes the following holidays, which shall be considered non-working days.
If the Contractor elects to work on any of the City holidays the Contractor shall be responsible for paying any associated inspection costs, including overtime and holiday premiums. Any work not completed and fully open to public traffic shall be maintained in a safe and delineated condition. Traffic control and safety devices shall be maintained at all times.
o New Year’s Day
o Martin Luther King Jr.’s Birthday
o Washington’s Birthday
o Cesar Chavez Day
o Memorial Day
o Juneteenth
o Independence Day
o Labor Day
o Veterans Day
o Thanksgiving
o Christmas Day
The Contractor’s working hours shall be limited to the hours between 8:00 A.M. and 6:00 P.M., Monday through Friday. Deviation from normal working hours will not be allowed unless written permission has been duly obtained beforehand from the office of the City Engineer. The Contractor shall provide adequate light for proper prosecution of the work, for the safety of the workmen and the public, and for proper inspection. In the event of either a requested or emergency deviation, inspection service fees will be charged against the Contractor. The service fees will be calculated at overtime rates including benefits, overhead and travel time. The service fees will be deducted from any amounts due to the Contractor.
Prior to issuing the Notice to Proceed, the Engineer will schedule a preconstruction meeting with the Contractor to review the proposed construction schedule and delivery dates, arrange utility coordination, discuss construction methods and clarify inspection procedures.
The names, addresses, and telephone numbers of the Contractor and subcontractors, or their representatives, shall be filed with the Public Works Manager and the County Sheriff’s Department or the City Police Department prior to beginning work.
The Contractor shall also notify the City of Hermosa Beach and the owners of all utilities and substructures not less than 72 hours prior to starting construction. The following utility
SP-14
companies list of names and telephone numbers is intended for the convenience of the Contractor and is not guaranteed to be complete or correct:
Southern California Edison Co. 310/783-9332
The Gas Co. 310/605-7837
Verizon 818/837-0394
Hermosa Beach Police & Fire 310/524-2750
Time Warner (Cable TV) 310/216-4184
West Basin Municipal Water District 310/217-2411
Athens Services 626/934-4696
California Water Service Co. 310/257-1428
Underground Service Alert 800/227-2600
Los Angeles County Flood Maintenance 562/861-0316
Los Angeles County Public Works 626/458-3109
The Contractor shall submit periodic Progress Reports to the Director of Public Works by the tenth day of each month. The report shall include an updated Construction Schedule. Any deviations from the original schedule shall be explained. Progress payments will be withheld pending receipt of any outstanding reports.
6-4.3 Payment for Delays.
To the furthest extent permitted by law, replace the entire subsection with the following:
In compliance with the provisions of California Public Contract Code § 7102, the Contractor will be compensated for damages incurred due to delays in completing the Work due solely to the fault of the City, where such delay is unreasonable under the circumstances and not contemplated by the parties. The Contractor and City agree that determining actual damages is impracticable and extremely difficult. As such, the Contractor shall be entitled to the appropriate time extension and to payment of liquidated damages in the sum of $1,200 per Day of delay in excess of the time specified for the Completion of the Work. Such amount shall constitute the only payment allowed and shall necessarily include all overhead (direct or indirect), all profit, all administrative costs, all bond costs, all labor, materials, equipment and rental costs, and any other costs, expenses and fees incurred or sustained as a result of such delay. The Contractor expressly agrees to be limited solely to the liquidated damages for all such delays as defined in this subsection. 6-9 LIQUIDATED DAMAGES.
Add the following:
The amount of liquidated damages is hereby amended to $1,200 for each consecutive calendar day.
SECTION 7 – MEASUREMENT AND PAYMENT.
SP-15
7-3 PAYMENT.
7-3.2 Partial and Final Payment.
Replace the entire subsection with the following:
The closure date for periodic progress payments shall be the twenty-fifth day of each month.
Authorization to pay is commonly received on the tenth day of the following month.
However, payments will be withheld pending receipt of any outstanding reports required by the Contract Documents.
The closure date for the purpose of making partial progress payments will be the last day of each month. The Contractor may request, in writing, that such monthly closure date be changed. The Engineer may approve such request when it is compatible with the AGENCY'S payment procedure. Each month, the Contractor shall meet with the Engineer, a minimum of three working days prior to the submittal of the progress payment to the AGENCY, to finalize and receive approval regarding the measurement of the Work performed through the closure date and the estimated value of the progress payment based on the contract Unit Prices or as provided for in the bid schedule. Any progress payment submitted without such approval will be considered incomplete and returned to the Contractor and no payment shall be considered until such approval is obtained. Payments will be withheld pending receipt of any outstanding reports required by the contract documents. In addition, the final progress payment will not be released until the Contractor returns the control set of specifications and plans indicating the as-built conditions. At the request and expense of the Contractor, who shall retain beneficial ownership and receive interest, if any thereon, the AGENCY shall permit the substitution and deposit therewith of securities equivalent to the amount of any monies withheld by the AGENCY.
At the expiration of 35 days from the filing and recording of the Notice of Completion of the Work, the amount deducted from the final estimate and retained by the AGENCY will be paid to the Contractor except such amounts as required to be withheld by properly executed and filed to stop payment, or as may be authorized by the contract.
7-4 BID ITEMS
7-4.1 TRAFFIC CONTROL & PUBLIC SAFETY The Contractor shall provide and maintain all construction area traffic controls in accordance with Section 7-10 of the Standard Specifications for Public Works Construction, the latest version of the California Manual on Uniform Traffic Control Devices (CA MUTCD), and Work Area Traffic Control Handbook (WATCH), and as noted herein. All necessary traffic control devices shall be in place prior to the start of work on a project section.
The Contractor shall so conduct his operations as to offer the least possible obstruction and inconvenience to public traffic, particularly in South Park’s parking lot. Every effort shall be made to provide a clear and unobstructed view of all traffic control signs, signals, or markers.
The Contractor shall maintain access for emergency vehicles at all times. The Contractor shall maintain a 24-hour emergency service to remove, install, relocate, and maintain warning devices
SP-16
and shall furnish to the Engineer, names, and telephone numbers of three persons responsible for this emergency service. In the event these persons do not promptly respond when notified, or it becomes necessary to call other forces to accomplish emergency service, the Contractor will be responsible for any cost incurred. All existing permanent traffic control signs, barricades and devices shall remain in effective operation unless a substitute operation is arranged for and approved by the Engineer.
Prior to the start of each workday, the Contractor shall perform all necessary work incidental to and commensurate with the proper signing, detouring, barricading, etc., heretofore and hereinafter specified that is required for that particular day's schedule of operations. No construction shall be permitted until such signing and detouring operations have been completed.
The Contractor may post "Temporary No Parking" signs only after notifying and receiving approval from the Engineer. Type of sign, method, and location of such posting shall conform to the State of California uniform sign chart. The Contractor shall be required to provide and maintain all necessary flag persons, barricades, delineators, signs, flashers, and any other safety equipment as set forth in the latest publication of the California MUTCD, or as required by the Engineer to insure safe passage of traffic.
The Contractor shall submit a traffic control and Phasing plan for approval prior to beginning construction. No work shall commence on a phase until the previous phase is completed unless approved by the Engineer. The Contractor shall include these sequences in his work progress schedule to be submitted. The Contractor shall provide written notification to all businesses and residents near the construction one week prior to the work start date. The notice shall be prepared by the contractor, approved by the City, distributed by the Contractor, and will include a preliminary schedule, name of the job superintendent/foreman and a telephone number where he can be reached 24 hours a day in case of emergency.
The cost for all project noticing will be included in the price of the traffic control. Failure or refusal by the Contractor to comply with the above requirements shall be sufficient cause for the Engineer to order the work done by City forces and all costs thereof to be borne by the Contractor.
Should the Contractor appear to be negligent in furnishing warning and protective measures as above provided, the Engineer may direct attention to the existence of a hazard, and the necessary warning and protective measures shall be furnished and installed by the Contractor, at his/her expense. Should the Engineer point out the inadequacy of warning and protective measures, such action on the part of the Engineer shall not relieve the Contractor from responsibility for public safety or abrogate its obligation to furnish and pay for these devices.
The Contractor shall provide access as required to accommodate special circumstance at any residence including access for disabled, impaired, special medical needs, etc.
PAYMENT FOR TRAFFIC CONTROL & PUBLIC SAFFETY shall be included in the cost for other items of work and shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals and for doing all the work involving placing, removing, storing,
SP-17
maintaining, moving to new locations, replacing and disposing of the components of traffic control system as specified in the Standard Specifications and these specifications, and as directed by the City. Progress payments for this item shall be paid in accordance with the completion percentage of the project. The lump sum price shall also include non-skid steel plates and temporary AC including installation and removal; all associated temporary signing and striping; flashing arrow signs; flagging and/or flagger costs; and project notifications where no additional compensation will be made thereof.
7-4.2 BEST MANAGEMENT PRACTICES
Per the Federal Clean Water Act, the Contractor is required to eliminate pollution to waters of the United States in regards to this project. This project will require the Contractor to implement Best Management Practices (BMP’s). The Contractor shall implement the Project’s Erosion Control Plan which outlines specific BMP’s to be used during construction to ensure that sediment from storm runoff and construction activities does not enter storm drains. Some of the primary water pollution control measures anticipated for this project include, but are not limited to, covering all storm drain inlets in the project vicinity with water permeable fabric and gravel bags prior to performing any removal or paving operations; properly fueling and cleaning all equipment/vehicles; maintaining an ample supply of gravel/sand bags on-hand in the event of rain; properly contain any chemicals; properly covering all incoming material trucks and all out going debris hauling vehicles; providing restroom facilities for workers; and regular street sweeping of the Work Area and Haul Routes to the satisfaction of the Engineer.
The requirements of all of the following agencies shall be met and maintained and where there is a conflict between requirements, the most stringent requirement shall govern. 1. Regional Water Quality Control Board 2. County of Los Angeles Flood Control Storm Water Quality.
The Contractor shall confirm that all of the BMP’s have been adequately detailed to address his anticipated construction operations.
PAYMENT FOR BEST MANAGEMENT PRACTICES shall be included in cost of the other items of work and provide full compensation for all costs incurred by the Contractor for Implementing Best Management Practices, complying with the requirements of the Project’s Erosion Control Plan and the cost of any required permits and no additional compensation will be made thereof.
7-3.4 MOBILIZATION
Mobilization and demobilization shall include all site visits; preparation of all submittals; BMPs; obtaining all permits, insurance, and bonds; video recording of the site existing conditions; moving onto the site all materials and equipment; set up of any temporary facilities (e.g. sanitary facilities, parking, construction water, equipment and materials staging area, distribution of all notification materials; removal of same at completion of the work; site cleanup; and other work as required to perform and complete the work.
No material, equipment, or vehicles to be left overnight on sidewalks or streets.
A minimum of one week prior to the start of construction, the Contractor shall video record all areas where construction is to take place. Such video recordings shall be provided to the Engineer
SP-18
before construction commences. These video recordings shall serve as a record of the existing conditions for disputes arising from restoration and should therefore be taken along the line of construction and site access and staging areas at sufficient detail as necessary to clearly depict details of existing conditions. Video recordings shall document existing sidewalks, and adjacent conditions. The video recordings shall be on two USB copies and given to the Engineer. All video recordings shall be indexed and catalogued in such a manner that each photographed area is readily identifiable and shall also indicate the date and time (hour, minutes, and seconds) on which the recording was made. The Contractor shall also video record any unusual conditions encountered during construction that are not already a matter of photographic record. In any areas where existing conditions cannot be determined by means of video recording, the area shall be restored as approved by the Engineer at Contractor's expense. All video recordings shall become the property of the City.
Mobilization shall consist of preparatory work and operations including, but not limited to, those necessary for the movement of personnel, equipment, materials and incidentals to the project site necessary for work on the project and for all other work and operations which must be performed or costs incurred including bonds, insurance, construction permits and/or permit riders as may be required by law, and financing prior to beginning work on the various contract items on the project site.
Mobilization shall also include the cost, time and labor to move the necessary construction equipment to and from the job site, supervisory time on the job by the Contractor's personnel to keep the construction site in a safe condition and all other related work as required for all nonworking days during the course of construction. Contractor is responsible for securing an adequate storage site for equipment and materials.
Mobilization shall include any work shown on the plans, including removal and/or relocation of an item of work shown on construction documents, which has no corresponding bid item for said work. This work shall include removal of vegetation, removal and/or modifications to the existing planters, wall, fences, gates within the project area, on private properties and within the public right of way as shown on the construction documents. Full compensation relating to that work, including the furnishing of labor and materials, and the disposal of materials shall be included herein.
Mobilization shall include compliance with water quality and air quality laws; furnishing all water required for the construction work; protection of utilities, trees, fences, walls, landscaping, and other facilities; and the relocations as shown on the plans. All complaints received by the City associated with the construction alleging damage to private property and vehicles shall be responded to by the Contractor within one working day of notification. Failure to comply with this provision may result in a penalty of one hundred and fifty dollars ($150.00) per occurrence.
The Contractor shall have on the work site at all times, as its agent, a competent superintendent capable of reading and thoroughly understanding the plans, specifications, other related documents, and directions from the Engineer.
Contractor shall confine his operations and work area within the project area. No encroachment into private property will be permitted without the prior written consent of the property owner.
Obtaining this consent will be the responsibility and the costs of the Contractor. Material shown
SP-19
on the plans or designated in the Special Provisions which is to be used in the reconstructed work and which has been damaged or destroyed as a result of the Contractor’s operations shall be repaired or replaced at the option of the Engineer by the Contractor at the Contractor’s sole expense.
The Contractor shall provide personnel to keep the construction site in a safe condition at all times, including non-working hours. Mobilization shall include scheduling and phasing of the work per the requirements of the City. The Contractor shall coordinate all construction activities with the City.
PAYMENT FOR MOBILIZATION shall be per the Lump Sum (LS) price bid not exceeding 5% of the total bid amount for the project and shall include obtaining and paying for all bonding, insurance, business licenses and permits, as required for entire project, from the City of Hermosa Beach and all related agencies including but not limited to utility companies and private and public agencies. The City of Hermosa Beach will waive its permit fee.
The Contractor shall comply with the requirements specified by each license or permit.
Compensation also includes furnishing a crew to pothole at the discretion of the Engineer.
Progress payments for this item shall be paid in accordance with the completion percentage of the project and shall include the costs of such mobilization and administration for the entire contract period.
7-4.4 SURVEY & CONSTRUCTION STAKING
Contractor shall complete all necessary survey and construction staking required to complete the work per these specifications and project’s plans.
PAYMENT FOR SURVEY & CONSTRUCTION STAKING shall be included in the cost of other items of work and shall include furnishing all labor, equipment, tools and materials necessary for the item of work involved in survey and construction staking required to complete the work and no additional compensation will be allowed thereof. 7-4.5 TEMPORARY CONSTRUCTION FENCING
It shall be the contractor’s responsibility to verify the limits of construction fencing with the City inspector.
PAYMENT FOR TEMPORARY CONSTRUCTION FENCING shall be made at the contract unit price per Lump Sum (LS) and shall include furnishing all labor, equipment, tools and materials necessary for the item of work. No additional compensation will be allowed thereof.
Temporary construction fencing shall remain in place and properly maintained by the contractor throughout the duration of the project including the “establishment period” as prescribed in these documents.
7-4.6 SITE CLEARING
Site Clearing shall conform to Subsection 300-1 of the GREEN BOOK as well as Section 31 10 00 of the Technical Provisions, and shall include all clearing and grubbing for the construction of
SP-20
the new improvements, and any clearing and grubbing and/or removal and replacement shown on the plans for which there is no bid item of work.
Site Clearing shall include the removal and disposal of existing concrete, existing foundations and concrete bae for existing benches, existing lawn and planting areas, existing irrigation systems within the limits of work, and other items as shown on the plans and as directed by the City. Contractor shall coordinate with the City prior to the removal of the planting for potential salvaging. Any improvements, landscaping and irrigation destroyed by construction operations shall be replaced by the Contractor. Any replacement including plant materials and irrigation system shall be approved by the City prior to any construction. The Contractor shall control any dust that is caused by clearing and grubbing operations. No additional compensation will be allowed for removal or disposal of any other materials, which may require special handling or disposal.
PAYMENT FOR SITE CLEARING shall be made at the contract unit price per Square Foot (SF) and shall include furnishing all labor, equipment, tools and materials necessary for the item of work. No additional compensation will be allowed thereof. Progress payments for this item shall be paid in accordance with the percentage of total contract work performed. 7-4.7 IRRIGATION SYSTEM
Refer to Section 32 84 00 (Technical Provisions).
PAYMENT FOR INSTALLION OF NEW IRRIGATION SYSTEM as shown on plans and specified herein shall be made at the contract unit price per Lump Sum (LS) and shall include furnishing all labor, equipment, tools and materials necessary for the item of work including but not limited to excavation, backfilling, compaction of trenches for installation of irrigation lines, nozzles, spray heads, valves, sleeving, quick couplers and irrigation controller. No additional compensation will be allowed thereof.
7-4.8 CAST-IN-PLACE CONCRETE PAVING (4” THICK)
Refer to Section 32 13 13 and 32 13 23 (Technical Provisions) Construction of 4” thick Cast-in-Place Concrete Paving shall conform to Section 303-5 of the Standard Specifications and the Project Plans with lines and grades to meet existing. In order to meet ADA requirements, cross slope of new paved surfaces shall be 2%. The remaining concrete adjacent to new paved areas shall be protected in-place and intact. Any damage caused by the Contractor shall be replaced at no cost to the City. The Contractor shall protect all existing drainage pipes and structures and other existing improvements not designated to be removed inplace and intact.
The Contractor shall trim trees; trimming and/or removing shrubs; removing tree roots encountered within paving areas, including saw-cutting and disposing of roots, reconstruction of existing sprinkler systems to match new configurations, soil import (if necessary), backfilling as
SP-21
necessary, grading and compacting; disposal of excess excavated materials and all construction debris. All new improvements will match the existing grades, design and color of existing adjacent concrete within the work area and/or be in accordance with Standard Plans for Public Works Construction, published by BNI.
Miscellaneous Work The following miscellaneous work shall be included in the scope of work for the bid items stated:
1. Adjusting all existing irrigation control boxes, conduits, and conductors etc. to grade
2. Protecting and supporting all existing improvements, not designated to be removed, adjoining and adjacent new improvements including, but not limited to, walls, fences, brick work, PCC, etc.
3. Providing forms; excavating, backfilling and compacting form areas.
4. Disposing of all excavated and removed materials (including PCC, AC, CMB, CTB, slurry backfill, dirt, ivies, plants, trees, roots, stumps, branches, grass, bricks, fences, woods, etc.)
5. Cutting and replanting existing turf to meet walkway.
6. Replacing any broken, cracked, or otherwise damaged water meter boxes and lids prior to placement of walkway.
7. Restoring and replacing all landscaping and irrigation systems.
MATERIAL - Concrete shall be Class 520-C-2500.
PAYMENT FOR CAST IN PLACE CONCRETE PAVING (4” THICK) shall be made at the contract unit price per Square Foot (SF) and shall include furnishing all labor, equipment, tools and materials necessary for the item of work including unclassified excavation, removal of existing improvements and materials, preparation of subgrade, construction of cast-in-place concrete, irrigation repair, landscaping restoration, adjustment of miscellaneous utility items found within the limits of construction and finishing. No additional compensation will be allowed therefor.
7-4.9 REMOVAL AND RE-INSTALLTION OF PARK BENCHES
Refer to Section 12 93 00 (Technical Provisions).
PAYMENT FOR REMOVAL AND RE-INSTALLTION OF EXISTING PARK BENCHES shall be made at the contract unit price per Each (EA) and shall include furnishing all labor, equipment, tools and materials necessary for removal , protection and temporary storage of the existing park benches, complete removal of concrete bases (under each leg of the bench), all necessary grading and backfilling, and repair of benches necessary for re-installation of park benches by anchoring each leg to new concrete pad, as shown on the plans. No additional compensation will be allowed therefor.
7-4.10 STABILIZED DECOMPOSED GRANITE (4” THICK)
Refer to Section 32 15 13 (Technical Provisions).
SP-22
PAYMENT FOR STABILIZED DECOMPOSED GRANITE (4” THICK) shall be made at the contract unit price per Square Foot (SF) and shall include furnishing all labor, equipment, tools and materials necessary for the item of work. No additional compensation will be allowed thereof.
7-4.11 SOIL PREPARATION AND FINE GRADING
Refer to Sections 32 90 00, 32 22 19 and 32 91 13
PAYMENT FOR SOIL PREPARATION AND FINE GRADING shall be included in bid price for other items of work and shall include furnishing all labor, equipment, tools and materials necessary for the item of work. No additional compensation will be allowed thereof. 7-4.12 WEED ABATEMENT
Refer to Sections 32 90 00 and 32 98 13
PAYMENT FOR WEED ABATEMENT shall be included in bid price for other items of work and shall include furnishing all labor, equipment, tools and materials necessary for the item of work. No additional compensation will be allowed thereof.
7.4.13 INSTALLATION OF STEEL HEADER
Refer to Section 32 94 00
PAYMENT FOR INSTALLATION OF STEEL HEADER as shown on the plans shall be made at the contract unit price per linear foot (LF) and shall include providing all required labor, material, tools and equipment necessary for excavation, removal and disposal of soil to accommodate complete installation, of the steel header as specified. No additional compensation will be allowed thereof.
7.4.14 CMU BLOCK WALL AND CAP
Refer to Sections 04 22 00 and 32 13 23 (Technical Provisions) PAYMENT FOR CONSTRUCTION OF CMU WALL AND CAP as shown on the plans shall be made at the contract unit price per linear foot (LF) and shall include providing all required labor, material, tools and equipment necessary for excavation, removal and disposal of soil to accommodate construction of the wall, construction of foundation and complete construction of the Concrete Masonry Unit block wall and cap and finish as specified. No additional compensation will be allowed thereof.
7-4.15 RELOCATING AND SETTING EXISTING BOULDERS IN CONCRETE -Boulder Sizes greater than or equal to 24”
SP-23
PAYMENT FOR RELOCATING EXISTING BOULDERS as shown on plans and as directed by the City Engineer and setting them in concrete shall be made at the Lump Sum (LS) bid price and shall include furnishing all labor, equipment, tools and materials necessary for the item of work including reinstallation of boulders in cement base as Directed by the City Engineer. No additional compensation will be allowed thereof.
7-4.15.1 RELOCATING AND SETTING EXISTING BOULDERS IN CONCRETE – Boulder Sizes 12”-24”
PAYMENT FOR RELOCATING EXISTING BOULDERS as shown on plans and as directed by the City Engineer and setting them in concrete shall be made at the Each (EA) bid price and shall include furnishing all labor, equipment, tools and materials necessary for the item of work including reinstallation of boulders in cement base as Directed by the City Engineer. No additional compensation will be allowed thereof.
7-4.15.2 RELOCATING AND SETTING EXISTING BOULDERS IN CONCRETE – Boulder Sizes less than 12” wide
PAYMENT FOR RELOCATING EXISTING BOULDERS as shown on plans and as directed by the City Engineer and setting them in concrete shall be made at the Each (EA) bid price and shall include furnishing all labor, equipment, tools and materials necessary for the item of work including reinstallation of boulders in cement base as Directed by the City Engineer. No additional compensation will be allowed thereof.
7-4.16 REPAIR OF TIMBER STAIRS
PAYMENT FOR REPAIR OF TIMBER STAIRS as shown on plans and as directed by the City Engineer shall be made at the Each (EA) bid price and shall include furnishing all labor, equipment, tools, materials and equipment necessary for excavation, removal and disposal of existing improvements and materials, preparation of subgrade, construction of new steps, irrigation repair, landscaping restoration, and finishes as Directed by the City Engineer. No additional compensation will be allowed thereof.
7-4.17 TREES - 24” BOX
Refer to Sections 32 91 13, 32 93 00 and 32 94 00 (Technical Provisions).
PAYMENT FOR PROVIDING AND INSTALLING 24” BOX TREES shall be made at the contract unit price per Each (EA) and shall include furnishing all labor, equipment, tools and materials necessary for the item of work. No additional compensation will be allowed thereof. 7-4.18 SHRUBS – 1 GALLON
SP-24
Refer to Sections 32 91 13, 32 93 00 and 32 94 00 (Technical Provisions).
PAYMENT FOR PROVIDING AND INSTALLING 1 GALLON SHRUBS –shall be made at the contract unit price per Each (EA) and shall include furnishing all labor, equipment, tools and materials necessary for the item of work. No additional compensation will be allowed thereof. 7-4.19 SHRUBS – 5 GALLON
Refer to Sections 32 91 13, 32 93 00 and 32 94 00 (Technical Provisions).
PAYMENT FOR PRODING AND INSTALLING 5 GALLON SHRUBS –shall be made at the contract unit price per Each (EA) and shall include furnishing all labor, equipment, tools and materials necessary for the item of work. No additional compensation will be allowed thereof. 7-4.20 SHRUBS – 15 GALLON
Refer to Sections 32 91 13, 32 93 00 and 32 94 00 (Technical Provisions).
PAYMENT FOR PROVIDING AND INSTALLING 1 GALLON SHRUBS –shall be made at the contract unit price per Each (EA) and shall include furnishing all labor, equipment, tools and materials necessary for the item of work. No additional compensation will be allowed thereof. 7-4.21 TURF-SOD
Refer to Sections 32 91 13, 32 92 00 and 32 94 00 (Technical Provisions).
PAYMENT FOR TURF-SOD shall be made at the contract unit price per Square Foot (SF) and includes but is not limited to furnishing all labor, equipment, tools and materials necessary for the item of work, including fine grading, adding approved soils and amendments and installation of new turf . No additional compensation will be allowed thereof. 7-4.22 INSTALLATION OF WOOD MULCH (3” LAYER)
Refer to Section 32 94 00 (Technical Provisions).
PAYMENT FOR WOOD MULCH (3” LAYER) shall be made at the contract unit price per Cubic Yard (CY) and shall include furnishing all labor, equipment, tools and materials necessary for the item of work. No additional compensation will be allowed thereof. 7-4.23 LANDSCAPE ESTABLISHMENT PERIOD
Refer to Section 32 98 13 (Technical Provisions).
The contractor shall perform work under this section consisting of the following, for a frequency at a minimum of once per week, for a duration of a minimum of 90 calendar days:
1. Litter Control
SP-25
2. Weed Control
3. Pest Control
4. Plant Care
5. Fertilization of Plant Materials
6. Plant Replacement
7. Plant Pruning
8. Plant Staking and Adjustments
9. Temporary Plant Protection
10. Operation, Adjustment, and Maintenance of Irrigation Controller and Irrigation System
11. Cleaning of Paving Surfaces
12. Reapplication of Mulching Materials
13. Erosion Control and Drainage
14. Removal of Green Waste
Contractor shall also perform adequate maintenance of turf grass for duration of establishment period, this work shall include irrigation, weed control, minimum one mowing to maintain uniform growth and height, reseeding/overseeding, aeration and fertilization.
PAYMENT FOR LANDSCAPE ESTABLISHMENT PERIOD as indicated in technical provisions for a duration of 90 calendar days shall be made at the contract unit price per Lump Sum (LS) and shall include furnishing all labor, equipment, tools and materials necessary for the item of work. No additional compensation will be allowed thereof.
Add the following subsection:
7-5.1 Work Performed Without Direct Payment.
Tools and materials of any class for which no price is fixed in the Proposal, it shall be understood that such work, equipment, labor, tools, and materials shall be provided without extra charge, allowance, or direct payment of any kind. The cost of performing such work or furnishing such equipment, labor, tools, and materials shall be included in the unit bid prices in the Proposal and no additional compensation will be paid thereof.
7-5.2 Basis for Establishing Costs.
7-5.2.1 Labor.
Replace the entire subsection with the following:
The costs of labor will be the actual cost for wages of workers performing the extra work at the time the extra work is done, plus the employer payments of payroll taxes, health and welfare, pension, vacation, apprenticeship funds, and other direct costs, resulting from Federal, State, or local laws, as well as assessments or benefits required by collective bargaining agreements. 7-5.3 Markup
7-5.3.1 Work by the Contractor.
SP-26
Replace the entire subsection with the following:
An allowance for overhead and profit shall be added to the Contractor’s costs and shall constitute the full and complete markup for all overhead and profit on extra work performed by the Contractor. The Contractor shall also be compensated for the actual increase in the Contractor’s bond premium caused by the extra work. The markup shall be:
a. Labor – 20%
b. Materials – 15%
c. Tool and Equipment Rental – 15%
d. Other Items – 15%
7-5.3.2 Work by a Subcontractor.
When any of the extra work is performed by a subcontractor, the markup shall be applied to the subcontractor’s costs. An allowance for the Contractor’s overhead and profit shall be added to the sum of the subcontractor’s costs and markup and shall constitute the full and complete markup for all overhead and profit for the Contractor on work by the subcontractor. For Contractor markup of subcontractor’s costs, the allowance shall be 10% on the first $2,000 or portion thereof and 5% on costs in excess of $2,000.
SP-27
PART 2 – CONSTRUCTION MATERIALS
SECTION 200 – ROCK MATERIALS.
200-2 UNTREATED BASE MATERIALS.
200-2.1 General.
Replace the entire subsection with the following:
Materials for use as untreated base or subbase shall be crushed miscellaneous base.
SECTION 201 – CONCRETE, MORTAR, AND RELATED MATERIALS.
201-1 PORTLAND CEMENT CONCRETE.
200-1.1 General.
Add the following:
Concrete shall be type 520-C-2500 PSI concrete per the City of Hermosa Beach Standard Plans for Public Works No. 106.
SP-28
PART 3 – CONSTRUCTION METHODS
SECTION 300 – EARTHWORK.
300-1 CLEARING AND GRUBBING.
300-1.2 Root Pruning and Tree Trimming.
Replace the entire section with the following:
a. Equipment
Pruning of roots shall be done using a Vermeer trenching machine with a root pruning attachment or a comparable piece of equipment, as approved by the Engineer. The equipment shall safely cut a narrow trench four to six inches wide to accommodate the installation of the root barrier.
Where sidewalks, curb ramp, or curbs are removed, the roots can be severed at the point adjacent to the edge of the new sidewalk, curb ramp, or curb to be installed, using other pneumatic tools to make the break-out and removal work more efficient.
Any roots over three inches in diameter must be cleanly cut using a chain saw or other sawing tool before the barrier is installed and the trench backfilled. b. Execution
Tree roots and other objectionable material shall be removed from areas of construction to a depth of 6 inches below the bottom of concrete. Tree roots shall be removed from parkways if visible or if instructed by Engineer.
Cleanly cut roots do not need to be painted or treated in any way other than the installation of root deflection barrier.
300-1.4 Payment.
Replace the entire subsection with the following:
There shall be no separate payment for root pruning or tree trimming; all costs thereto shall be considered included in the Contract unit prices for the items of work for which the pruning or trimming is required.
There shall be no separate payment for clearing and grubbing; all costs thereto shall be considered included in the Contract unit prices for the items of work for which clearing and grubbing is required.
SP-29
PART 4 – EXISTING IMPROVEMENTS
SECTION 400 – PROTECTION AND RESTORATION.
Add the following subsections:
400-4 TREES.
The Contractor shall take care to protect all trees not approved for removal by the Engineer.
There shall be no separate payment for protection of existing trees; all costs thereto shall be considered included in the Contract unit prices for the items of work for which the protection is required.
PART 8 – LANDSCAPING AND IRRIGATION
SECTION 800 – MATERIALS.
800-1 LANDSCAPING MATERIALS.
800-1.1 NOT USED.
800-1.4.2 Trees.
Add the following:
New trees furnished by the Contractor shall be 24 inch box trees.
Add the following subsection:
800-1.4.2.1 DELIVERY, STORAGE, AND HANDLING OF TREES
Trees shall not be pruned before delivery. Contractor shall protect trunks, fronds, growing tips, and root systems from sun scald, drying, sweating, whipping, and other handling and tying damage during transport. Tree shall not be bent or bind-tie trees in such a manner as to destroy natural shape. Trees shall be covered and protected during delivery.
Immediately after digging field-grown trees wrap root systems in wet burlap or other suitable material to keep root system constantly moist until installation at the project site. Deliver freshly dug field-grown trees with firm, natural balls of earth of sufficient depth to include fibrous and feeding roots. Protection of trees during harvesting, transport, and storage shall be the Contractor’s responsibility. Contractor shall investigate the specific species requirements of storing prior to performing any Work.
Handling Trees:
Lift and handle trees with extreme care. Remove wrappings or containers (where applicable) carefully. If root ball is cracked or broken during handling, tree will be rejected and a new one shall be furnished by the Contractor at no additional cost to the City. a. Handle container-grown tree(s) only by its container. b. Contractor shall not handle tree(s) by its fronds or root ball. c. Contractor shall not drop any tree(s).
SP-30
d. Contractor shall not bind or handle tree(s) directly with wire or rope at any time. Pad trunk of tree(s) whenever using hoisting cables, chains, slings, or straps. e. Climbing Spikes: Use of climbing spikes for any work performed on tree(s), pre or postinstallation, is prohibited. f. Should Contractor engage in handling any tree(s) by unacceptable method(s) the City shall reserve the right to reject any of the mishandled tree(s). Contractor shall replace rejected tree(s) with approved tree, at no additional cost to the City. g. Deliver tree(s) only after preparations for planting have been completed and a minimum amount of time elapses between delivery to site and installation. If planting is delayed more than six (6) hours after delivery, set tree(s) in shade, protect from weather and mechanical damage, and keep roots moist. Do not remove container-grown tree stock from containers before time of planting.
h. Labeling: For all field-dug tree(s), attach label to tree showing genus, species, variety, height, name of grower point of origin. For containerized tree, furnish standard products in standard containers bearing original labels. Legibly show genus, species, variety, and name of grower.
SP-31
SECTION 801 – INSTALLATION.
801-2 NOT USED.
801-4 PLANTING.
801-4.5 Tree and Shrub Planting.
Replace the entire subsection with the following:
Installation practices of the trees shall be performed during those periods when weather and soil conditions are suitable and in accordance with locally accepted horticultural practices.
Soil moisture levels prior to planting shall be no less than seventy-five percent (75%) of field capacity. The determination of adequate soil moisture for planting shall be in the sole judgment of the Public Works Inspector, and their decision shall be final. a. If the soil moisture level is found to be insufficient for planting installation, planting pits shall be filled with water and allowed to drain before commencing planting operations. b. Any planting area that may become compacted in excess of eighty-five-percent (85%) relative compaction (due to construction operations or other activities during the Contract) shall be tilled and thoroughly cross-ripped to a minimum depth of nine-inches (9”) to alleviate the condition, taking care to avoid all existing subsurface utilities, drainage, etc. c. Contractor shall notify the Engineer, in writing, on the anticipated commencement date and length of duration of the landscape installation.
d. Contractor shall confirm with the Engineer locations of all trees prior to planting. e. No more plant materials and trees shall be distributed in the planting area on any day than can be installed and watered on that day. Trees shall be planted and watered immediately after the removal of their containers, as applicable.
f. Contractor shall protect existing and new improvements and systems installed prior to planting installation, and shall protect in place until completion of work. g. Planting holes shall be approximately square with vertical sides twice the depth and width of the plant container or ball, and shall larger if necessary to permit handling and planting without injury or breakage of the root ball or root system. h. The native soil at the bottom of planting holes shall be scarified to a depth of 6”. i. A layer of prepared soil mix shall be deposited in the planting hole. j. The tree shall be set approximately at the center of the hole. k. Prepared soil mix shall be deposited in the remainder of the hole to finish grade. l. The backfill shall be thoroughly water-settled and additional prepared soil mix added to fill any remaining void below finish grade.
m. Planting holes shall be backfilled with a prepared soil mix. Soil shall consist of 50% of the specified topsoil, and 50% organic soil amendment.
Trees shall be installed with root barriers if specified on plans and in accordance with the installation procedure described in Section 801-11.
PART 9 – SPECIFIC CONDITIONS
Section 900 -WORK AREA
SP-32
900-1.1 Park Access
The subject work area is the northerly portion of the South Park. The southerly portion of the park which includes play field area, walkways and seating areas shall remain open to the public during the course of construction. Contractor shall provide, install and maintain, in good condition and at all times, temporary fencing around the perimeter of the designated work area. 900-1.2 Contractor Laydown and Storage Area
Contractor’s laydown and storage area shall be located within the work area related to the scope of work and shall remain secured and separated from the rest of the park by the contractor installed temporary fencing.
Section 901- CONSTRUCTION MANAGEMENT SOFTWARE
900-1.1 Procore Software
The contractor shall use the Procore construction management software (with account for the project made available by the City at no additional cost) for various construction management activities related to the project including but not limited to submission of schedules, project material submittals, and RFIs. Project documents including plans and specifications will also be made available on Procore for the contractor’s use for the duration of the project.
SP-33
EXHIBIT “A” – SCHEDULE OF PERFORMANCE
CIP 603 SOUTH PARK SLOPES AND IRRIGATION REPAIRS
SECTION 1. BEGINNING OF WORK, TIME OF COMPLETION
1. Attention is directed to the provisions of Section 6-1 ("Construction Schedule and Commencement of the Work"), Section 6-1.1 ("Construction Schedule"), and Section 6-9 ("Liquidated Damages"), of the State Specifications, and these Provisions.
2. The Contractor shall complete work within seventy-five (75) working days after receiving the "Notice to Proceed". After completion of work, the contractor shall maintain the work for an additional ninety (90) calendar days for the purpose of plant and grass establishment.
3. The Contractor and its securities will pay the sum of one thousand two hundred dollars ($1,200) as liquidated damages for each consecutive calendar day of delay in the performance of the work in this agreement and as shown on the plans.
SP-34
EXHIBIT “B” – SOLID WASTE REPORTING
CIP No. 603 SOUTH PARK SLOPES AND IRRIGATION REPAIRS
SOLID WASTE REPORTING
Pursuant to the California Integrated Solid Waste Management Act of 1989, the City is required to report the amount of solid waste generated within the City and the disposal of that waste with the ultimate required goal of being a reduction of at least 50% in the amount of solid waste being disposed in landfills. To permit the City to comply with this State law, the Contractor is required to complete the Solid Waste Report form, a copy of which is included in these special provisions.
The report includes a summary of the solid waste generated by the project, a summary of solid waste disposed of at class III landfills and a summary of solid waste diverted form disposal through recycling and re-use. The Contractor may use a self-generated report format that includes all of the information included on the City form.
The report shall be filed with the City after project completion and prior to final payment. If the project time span includes more than one calendar year, a separate report is required for the solid waste in each calendar year. A report for a calendar year that does not coincide with project completion shall be filed with the City on or before January 31st.
Supporting documents to be submitted with the report shall include legible copies of weigh tickets, receipts, or invoices that specifically identify the job site location that generated the waste materials. If materials are taken to a location where weigh tickets, receipts, or invoices are not available, the Contractor shall provide the documentation on its own company letterhead.
The Contractor is encouraged to divert solid waste from disposal at landfills through recycling and re-use when possible while maintaining compliance with all other Contract specifications and special provisions.
SP-35
SP-36
EXHIBIT “C” – CONSTRUCTION NOTICE TEMPLATE
COMPANY LETTERHEAD
NOTICE OF WORK/CONSTRUCTION
Name of Project Date of Notice
Dear Residents and Businesses (if applicable):
Provide a brief description of the work that is to be performed. Four to five sentences should suffice.
What: Provide a brief description of what
is happening. One sentence should suffice.
Start/Duration: When is the project
expected to start and how long is it
anticipated to take for it to be completed?
If there are different phases, indicate the
estimated time.
What to Expect: Will there be noise? Will
there be flaggers directing traffic? Will
residents have access or will it be a full
closure? Will parking be temporarily
blocked? Include enough details.
Equipment in Use: What kind of
equipment will be seen?
Working Hours: What are the working
hours and days?
Contact Information
Always include contact information for residents and business owners in case they have questions or concerns.
We apologize for any inconvenience and thank you for your patience. Sincerely, Contractor Name
Map detailing what
streets will be closed.
SP-37
EXHIBIT “D”- HAUL ROUTES
1315 Valley Drive, Hermosa Beach, CA 90254 | hermosabeach.gov | HermosaBeachCity HermosaBchCity
ADDENDUM No. 3
CIP 603 – South Park Slope and Irrigation Repairs
DATE: January 22, 2025
TO: All Prospective Bidders
Please note the following changes and/or additions to the Notice Inviting Bids, Plans and Specifications for the project indicated above.
1. Response to Questions
1. Please provide detail of installation for existing boulder to be relocated.
A. Refer to Appendix “A” to this addendum, Revised Plans, Sheets L-02 and L-03.
2. The specification makes a lot of mentions to a Geotechnical Report as indicated. Can you please send us the Geotechnical Report? Also, is the City going to provide compaction test and a Geotechnical Engineer? A. The scope of work of this project is not subject to a geotechnical report. The City will not provide compaction testing or require the services of a Geotechnical Engineer.
3. Refer to NOTICE INVITING BIDS
Delete the paragraph:
Notice is hereby given that the City of Hermosa Beach will receive electronic bids until 2:00PM on Thursday, January 23, 2024, at which time the electronic bids will be publicly opened at the City Council Chambers at 1315 Valley Drive, Hermosa Beach, CA 90254 and posted on Planet Bids for CIP 603 – South Park Slope and Irrigation Repairs
Replace with the following:
Notice is hereby given that the City of Hermosa Beach will receive electronic bids until 2:00PM on Tuesday, January 28, 2024, at which time the electronic bids will be publicly opened at the City Council Chambers at 1315 Valley Drive,
1315 Valley Drive, Hermosa Beach, CA 90254 | hermosabeach.gov | HermosaBeachCity HermosaBchCity
Hermosa Beach, CA 90254 and posted on Planet Bids for CIP 603 – South Park Slope and Irrigation Repairs
4. Refer to CIP 603 – SOUTH PARK SLOPE AND IRRIGATION REPAIRS Replace the Sheets L-02, and L-03 with their revisions included in Appendix “A”- Revised Plans.
5. Refer to Bid Schedule
Replace Bid Schedule with Appendix “B”, Updated Bid Schedule.
6. Refer to Special Provisions
Replace Special Provisions with Appendix “C” – Revised Special Provisions ADDENDUM ISSUED BY: _____________________________________ John Oskoui, Interim City Engineer
1315 Valley Drive, Hermosa Beach, CA 90254 | hermosabeach.gov | HermosaBeachCity HermosaBchCity
ACKNOWLEDGEMENT OF ADDENDUM No.
CIP 603 – South Park Slope and Irrigation Repairs
Complete and sign this acknowledgement form. Enclose the original copy of the acknowledgement in your bid. Failure to do so may result in disqualification of your firm’s bid.
The undersigned acknowledges receipt of Addendum No. 3 dated January 22, 2025.
ATTEST: _____________________________________
Principal: _____________________________________
Address: _____________________________________
By: _____________________________________
Title: _____________________________________
1315 Valley Drive, Hermosa Beach, CA 90254 | hermosabeach.gov | HermosaBeachCity HermosaBchCity
Appendix A
Revised Plans Sheets
L-02, and L-03
SYMBOL DESCRIPTION REMARKS MATERIALS LEGEND LIMIT OF WORK LIMIT OF WORK LIMIT OF WORK LIMIT OF WORK MATERIALS PLAN L-02 01/31/2026 811 W 7th Street, 8th Floor 04/22/2024 Los Angeles, California 90017-3419 United States www.swagroup.com +1.213.236.9090 o SWA Job Number HRBT101 Date 04/22/2024 0 10' 20' 1" = 20' C I T Y O F H E R M O S A B E A C H , C A 1 9 0 7 N
SYMBOL KEY DESCRIPTION MATERIAL MATERIALS SCHEDULE SYMBOL KEY DESCRIPTION DETAIL SUPPLIER SIZE COLOR FINISH REMARK DETAILMATERIALS ENLARGEMENT L-03 PLAN 0 5' 10' 1" = 10' 01/31/2026 811 W 7th Street, 8th Floor 04/22/2024 Los Angeles, California 90017-3419 United States www.swagroup.com +1.213.236.9090 o SWA Job Number HRBT101 Date 04/22/2024 C I T Y O F H E R M O S A B E A C H , C A 1 9 0 7 N WALL LEGEND Page 1318 of 1852 1315 Valley Drive, Hermosa Beach, CA 90254 | hermosabeach.gov | HermosaBeachCity HermosaBchCity
Appendix B
Updated Bid Schedule
18 B. BID SCHEDULE
CIP NO. 603 South Park Slopes & Irrigation Repairs
Item
No.
Estimated
Quantity
Unit Description of Work Payment
Reference
Unit
Price Total
1 1 LS
Mobilization and Demobilization
(5% max. of total bid schedule
cost)
7-3.4
- $
2 26,598 SF
Demo and remove existing
irrigation system, shrubs and
groundcovers and protect in
place all existing trees
7-4.6
- $
3 605 SF
Demo and remove existing
irrigation and planting for
installation of new stabilized
decomposed granite
7-4.6
- $
4 253 SF
Demo and remove existing
irrigation and planting for
installation of new cast in place
concrete
7-4.6
- $
5 1 LS Install Temporary Construction
Fence
7-4.5 - $
6 6 EA
Existing bench to be salvaged,
protected and stored outside of
planting area and re-installed on
new concrete pad
7-4.9
- $
7 1 LS Install New Irrigation System 7-4.7 - $
8 253 SF Construct Cast in Place Concrete
Paving
7-4.8 - $
9 605 SF Install stabilized decomposed
granite
7-4.10 - $
10 37 LF Install steel header 7-4.13 - $
11 17 LF Construct CMU block site wall
with precast concrete cap.
7-4.14 - $
12 5 EA Relocating and Setting Boulders
- Greater than or equal to 24”
7-4.15 - $
12.1 20 EA Relocating and Setting -
Boulders 12”-24”
7-4.15.1 - $
19 (Total Bid in Figures)
______ _____________
(Total Bid in Words)
_______ _____________
Contractor Name:
(Total Bid in Figures)
______
Item
No.
Estimated
Quantity
Unit Description of Work Payment
Reference
Unit
Price Total
12.2 60 EA Remove and Salvage - Boulders
less than 12” wide
7-4.15.2 - $
13 250 CY Install wood landscape mulch
(3” depth)
7-4.22 - $
14 28 EA
Repair timber steps replacing
existing soil infill with stabilized
decomposed granite
7-4.16
- $
15 2 EA Install 24” Box Tree 7-4.17 - $
16 1,106 EA Install 1 Gallon Shrub 7-4.18 - $
17 1,761 EA Install 5 Gallon Shrub 7-4.19 - $
18 140 EA Install 15 Gallon Shrub 7-4.20 - $
19 4,432 SF Remove and Install Turf-Sod 7-4.21 - $
20 1 LS Landscape Establishment Period 7-4.23 - $
20 (Total Bid in Words)
Contractor Name:
______
In case of any discrepancy between the words and the figures, the words shall prevail. If the unit price and the total amount for any item are not in agreement, the unit price alone shall be considered to represent the Bidder’s intention and all totals will be corrected to conform thereto. Attached hereto is cash, a certified check, a cashier's check, or a Bidder's bond in the amount of
__________________________________________________Dollars, said amount being not less than ten (10) percent of the amount bid. It is agreed a portion equal to the difference between the low bid and second low bid shall be retained as liquidated damages by the City if the undersigned fails or refuses to execute the Contract and furnish the required bonds and certificates of insurance within the time provided.
Contractor Signature: __________________________________________ PW Registration #: __________________________________________ State License #: __________________________________________ Contractor Company Name: __________________________________________
1315 Valley Drive, Hermosa Beach, CA 90254 | hermosabeach.gov | HermosaBeachCity HermosaBchCity
Appendix C
Updated Special Provisions
SP-1
CIP No. 603
SOUTH PARK SLOPES AND IRRIGATION REPAIRS
VI. SPECIAL PROVISIONS
The following Special Provisions supplement and amend the 2021 Standard Specifications for Public Works Construction (SSPWC). These Special Provisions have been arranged into a format and sequence that parallels the Standard Specifications for Public Works Construction.
SP-2
TABLE OF CONTENTS
PART 1 – GENERAL PROVISIONS…………………………………………………… SP-4
PREFACE: STANDARD SPECIFICATIONS AND STANDARD DRAWINGS……SP-4 SECTION 1 – GENERAL……………………………………………………………….SP-4
1-2 TERMS AND DEFINITIONS………………………………………………………..SP-4
SECTION 2 – SCOPE OF THE WORK………………………………………………..SP-4
2-2 PERMITS. ...............................................................................................................SP-4 2-5 THE CONTRACTOR’S EQUIPMENT AND FACILITIES. ...............................SP-5 2-5.5 Contractor’s Responsibility for Work..................................................................SP-5 2-5.6 Notice and Service Thereof. ................................................................................SP-5 2-11 RETENTION OF IMPERFEFCT WORK. ...........................................................SP-6 SECTION 3 – CONTROL OF THE WORK......................................................................SP-6 3-6 THE CONTRACTOR’S REPRESENTATTIVE. ..................................................SP-6 3-7 CONTRACT DOCUMENT. ...................................................................................SP-7 3-8 SUBMIITALS..........................................................................................................SP-7 3-13 COMPLETION, ACCEPTANCE, AND WARRANTY. ........................................SP-8 SECTION 5 - LEGAL RELATIONS AND RESPONSIBILITIES. .................................SP-9 5-3 LABOR.....................................................................................................................SP-9 5-4 INSURANCE...........................................................................................................SP-9 5-7 SAFETY.................................................................................................................SP-10 5-8 LAWS TO BE OBSERVED..................................................................................SP-11 5-9 FAIR EMPLOYMENT PRACTICE COMMISSION CERTIFICATION. ........SP-13 SECTION 6 – PROSECTION AND PROGRESS OF THE WORK..............................SP-13 6-1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF THE WORK.SP-13 6-9 LIQUIDATED DAMAGES. .................................................................................SP-15 SECTION 7 – MEASUREMENT AND PAYMENT. ......................................................SP-15 7-3 PAYMENT.............................................................................................................SP-15 PART 2 – CONSTRUCTION MATERIALS......................................................................SP-27 SECTION 201 – CONCRETE, MORTAR, AND RELATED MATERIALS................SP-27 201-1 PORTLAND CEMENT CONCRETE...............................................................SP-27 PART 3 – CONSTRUCTION METHODS..........................................................................SP-28 SECTION 300 – EARTHWORK. .....................................................................................SP-28 300-1 CLEARING AND GRUBBING. .......................................................................SP-28 PART 4 – EXISTING IMPROVEMENTS..........................................................................SP-29 SECTION 400 – PROTECTION AND RESTORATION. ..............................................SP-29 400-4 TREES................................................................................................................SP-29 PART 8 – LANDSCAPING AND IRRIGATION...............................................................SP-29 SECTION 800 – MATERIALS..........................................................................................SP-29 800-1 LANDSCAPING MATERIALS. .......................................................................SP-29
SP-3
800-1.1 Topsoil..............................................................................................................SP-29 800-1.4.2 Trees. ................................................................................................................SP-29 800-1.4.2.1 DELIVERY, STORAGE, AND HANDLING OF TREES ..........................SP-29 SECTION 801 – INSTALLATION. ..................................................................................SP-31 801-2 EARTHWORK AND TOPSOIL PLACEMENT. .............................................SP-31 801-2.1 General.............................................................................................................SP-31 801-4 PLANTING. .......................................................................................................SP-31 801-4.5 Tree and Shrub Planting.................................................................................SP-31 PART 9 – SPECIFIC CONDITIONS………………………………………………….SP- 32
SECTION 900 – WORK AREA………………………………………………………..SP-32
900-1.1 Park Access………………………………………………………………… SP-32
900-1.2 Contractor Laydown and Storage Area………………………………………… SP-32
SECTION 901 – CONSTRUCTION MANAGEMENT SOFTWARE........................SP-32 901-1.1 Procore Software..............................................................................................SP-32 EXHIBIT “A”- SCHEDULE OF PERFORMANCE ………………………………...SP-33 EXHIBIT “B”- SOLID WASTE REPORTING………………………………………SP-34
EXHIBIT “C”- CONSTRUCTION NOTICE TEMPLATE…………………………SP-36 EXHIBIT “D”- HAUL ROUTES …………………………………………………….. SP-37
SP-4
PART 1 – GENERAL PROVISIONS
PREFACE: STANDARD SPECIFICATIONS AND STANDARD DRAWINGS
The Standard Specifications for Public Works Construction (SSPWC), written and promulgated by the Southern California Chapter of the American Public Works Association and the Southern California Districts of the Associated General Contractors of California, shall be the Standard Specifications of the City. All work shall conform to the edition indicated in this document and in the bid proposal documents, including supplements, of the SSPWC, these Special Provisions which supplement or modify the SSWPC, the Standard Plans for Public Works Construction (SPPWC) of the same edition as the SSPWC, and the Standard Drawings as issued by the City available at the time bids are opened unless otherwise specified in the Contract Documents.
The above referenced Standard Specifications, Special Provisions and Standard Drawings are hereby made a part of the Contract Documents.
SECTION 1 – GENERAL.
1-2 TERMS AND DEFINITIONS.
Whenever the following terms are used in the SSPWC, they shall be understood to mean and refer to the following:
a) Board – The City Council of the City of Hermosa Beach b) Contract Documents – Documents including but not limited to the proposal forms, Special Provisions, Bonds, Insurance, Contract, and all Addenda setting forth any modifications to the documents.
c) Engineer – The City Engineer or his/her authorized representative d) Bidder – An individual, co-partnership, association, or corporation submitting a proposal for the work contemplated, acting directly or through a duly authorized representative. e) Legal Address of Contractor – The address given on the Contractor’s bid and is hereby designated as the place to which all notices, letters or other communications to the Contractor shall be mailed or delivered.
SECTION 2 – SCOPE OF THE WORK.
2-2 PERMITS.
Add the following:
Prior to beginning work, the Contractor shall obtain authorization and permits from the City of Hermosa Beach. The Contractor will be responsible to protect and preserve all property and improvements in accordance with the Contract Documents.
The Contractor must have or obtain a valid City of Hermosa Beach Business License in accordance with the provisions of the Hermosa Beach Municipal Code.
SP-5
City Right of Way Permit
A City Right of Way Permit is required to work within public right-of-way and will be issued at no cost to the Contractor.
Right of Way Permits
When work occurs in the right-of-way of other entities, the Contractor shall obtain a no fee right of way permit as required for an encroachment from that entity. 2-5 THE CONTRACTOR’S EQUIPMENT AND FACILITIES.
2-5.4 Haul Routes.
Replace the entire subsection with the following:
Hall Routes shall be per the City of Hermosa Beach Truck Routes map. See Exhibit “D”.
Add the following subsections:
2-5.5 Contractor’s Responsibility for Work.
Until the formal acceptance of the work by the City, the Contractor shall have the charge and care thereof and shall, subject to the insurance protection furnished, bear the risk of accident, loss or damage to any part thereof by action of the elements or from any other cause, whether arising from the execution or from the non-execution of the work. The Contractor shall rebuild, repair, restore and otherwise correct damages to any portion of the work occasioned by any of the above causes before its acceptance.
In case of suspension of work from any cause whatever, the Contractor shall be responsible for all materials and the proper temporary storage thereof. 2-5.6 Notice and Service Thereof.
Any notice required or given by one party to the other under the Contract shall be in writing and shall be dated and signed by the party giving such notice or by a duly authorized representative of such party. Any such notice shall not be effective for any purpose whatever unless served in the following manner:
Notice shall be given to the City by personal delivery thereof to the City’s Engineer or by depositing the same in the United States mail enclosed in a sealed envelope, registered and with postage prepaid, addressed to:
Public Works Department
City of Hermosa Beach
1315 Valley Dr.
Hermosa Beach, CA 90254
Notice shall be given to the Contractor by personal delivery thereof to said Contractor or to his authorized representative at the site of the project, or by depositing the same in the United States mail, enclosed in a sealed envelope addressed to said Contractor at the address established for the conduct of the work under this Contract, postage prepaid and registered.
Notice shall be given to the Surety, or any other person, by personal delivery to said Surety or
SP-6
other person, or by depositing the same in the United States Mail, enclosed in a sealed envelope addressed to such Surety or persons at the address of said Surety or persons last communicated to the party giving the notice, postage prepaid and registered. 2-5.7 Warranty of Title.
No materials, supplies, or equipment for the work under this Contract shall be purchased subject to any chattel mortgage or under a conditional sale Contract or other agreement by which an interest therein or any part thereof is retained by the seller or supplier. The Contractor warrants clear and good title to all materials, supplies, and equipment installed and incorporated in the work, and agrees upon completion of all work to deliver the premises, together with all improvements and appurtenances constructed or placed thereon by them to the City free from any claims, liens, encumbrances, or charges, and further agrees that neither they nor any person, firm, or corporation furnishing any material or labor for work covered by the Contract shall have any right to a lien upon the premises or any improvement or appurtenance thereon; provided, that this shall not preclude the Contractor from installing metering devices or other equipment of utility companies the title of which is commonly retained by the utility company.
Nothing contained in this section, however, shall defeat or impair the right of such persons furnishing materials or labor under any bond given by the Contractor for their protection, or any right under any law permitting such persons to look to funds due the Contractor, which are in the hands of the City.
2-11 RETENTION OF IMPERFEFCT WORK.
If any portion of the work done or materials furnished under the Contract proves defective or not in accordance with the specifications and Contract drawings, and if the imperfection in the same is not of sufficient magnitude or importance to make the work dangerous or undesirable, or if the removal of such work is impracticable or will create conditions which are dangerous or undesirable in the opinion of the Engineer, the Engineer shall have the right and authority to retain the work instead of requiring it to be removed and reconstructed, but he shall make such deductions therefor in the payment due the Contractor as may be just and reasonable.
SECTION 3 – CONTROL OF THE WORK.
3-6 THE CONTRACTOR’S REPRESENTATTIVE.
Add the following:
The Contractor shall provide the Engineer with the name, address, and business and home telephone numbers of the person responsible for the maintenance of barricades, traffic control signs, lights and other safety devices.
SP-7
3-7 CONTRACT DOCUMENT.
3-7.2 Precedence of Contract Documents.
Replace the entire subsection with the following:
If there is a conflict between any of the Contract Documents, the document highest in the order of precedence shall control. The order of precedence, from highest to lowest, shall be as follows:
1. Requirements of law, including the Code and Ordinances of the City of Hermosa Beach.
2. Permits from other agencies as may be required by law.
3. Permits from City of Hermosa Beach Departments as may be required by law or ordinance.
4. The Contract.
5. The Bid Proposal.
6. Addenda.
7. Notice Inviting Bids.
8. Instructions to Bidders.
9. Special and General Provisions.
10. Plans.
11. City of Hermosa Beach Standard Plans.
12. Other Standard Plans.
13. Standard Specifications for Public Works Construction.
14. Reference Specifications.
Change orders, supplemental agreements, and approved revisions to Plans and Specifications will take precedence over documents listed above, except those listed as FIRST, SECOND, and THIRD. Detailed plans shall have precedence over general plans. 3-8 SUBMIITALS.
3-8.1 General.
Add the following:
The Contractor shall submit the following submittals within ten (10) days of notification of the City’s intent to award this Contract:
• Project Construction Schedule, sequence, and phase sequence plan • Preconstruction video on USB, 2 copies
• Copy of City Business License (Prime and Subcontractors)
SP-8
• 24 Hr. Emergency Phone Call List
• Letters identifying site authorized Contractor’s representative or “Superintendent” and Contractor’s “Competent Person”
• Vehicular and Pedestrian Traffic Control Plan (paper and PDF) • WPCP / Best Management Practices
• Asphalt Concrete material specifications and mix design • Concrete material specifications and mix design
• Crushed Miscellaneous Base material specifications
• Topsoil material specifications
• Detectable Warning System/Truncated Domes for access ramps o One (1) ADA tile sample, minimum 6” x 6”
o Shop drawings for access ramp products showing fabrication details, composite structural system, tile surface profile, sound on cane amplification feature, plans showing tile placement including joints, and material to be used as well as outlining installation materials and procedure
• Constructions Notices sample template shall be provided by the City to the Contractor and modified and submitted to the engineer for review and approval. Approved Construction Notice shall be distributed by Contactor. See Exhibit C • Others as requested by the Engineer
3-13 COMPLETION, ACCEPTANCE, AND WARRANTY.
Add the following subsection:
3-13.4 Completion and Acceptance.
In addition to the guarantees as required in Section 2-4 of the Standard Specifications, the Faithful Performance Bond shall remain in full force and effect for a period of one year after acceptance of the work by the City to insure that defects, which appear within said period, will be repaired, replaced, or corrected by the Contractor, at its own cost and expense, to the satisfaction of the Engineer within thirty (30) days of written notice thereof by the City.
SP-9
SECTION 5 - LEGAL RELATIONS AND RESPONSIBILITIES.
5-3 LABOR.
Add the following subsection:
5-3.6 Laws.
Each Bidder must submit with the Bid Proposal a fully executed Certificate of NonDiscrimination by Contractors. Bids will not be considered unless accompanied by the completed Certificate.
After the opening of bids and the determination of the low Bidder, said low Bidder shall submit to the Public Works Department, no later than 5:00 P.M. on the third working day following the bid opening, a completed “Fair Employment Practices Contractor Compliance Report”.
The Contractor shall comply with all applicable provisions of Sections 1776, 1777.5 and 1777.7 of the C a l i f o r n i a L a b o r Code. The Contractor shall be responsible for compliance with Section 1776 and shall insert a provision in all subcontracts requiring subcontractors to comply with said section.
The Contractor is prohibited from performing work on this project with a subcontractor who is ineligible to perform work on the project pursuant to Section 1777.1 or 1777.7 of the Labor Code. 5-4 INSURANCE.
Replace the entire subsection with the following:
The Contractor shall, at its expense, maintain in effect all times during the performance of work under the Contract not less than the following coverage and limits of insurance, which shall be maintained with insurers licensed to sell insurance in the State of California and having a “A-“or higher rating in the latest edition of Best’s Insurance Guide, and shall be subject to approval by the City’s Risk Manager:
Workers’ Compensation and Employer’s Liability
• Workers’ Compensation – coverage as required by law
• Employer’s Liability – limits of at least $1,000,000 per occurrence Comprehensive General Liability
• Combined Single Limit - $5,000,000
Automobile Liability
• Combined Single Limit - $5,000,000
All of the Contractor’s policies shall contain an endorsement providing written notice shall be given to the City at least 30 calendar days prior to termination, cancellation or reduction of coverage in the policy
The Bodily Injury and Property Damage Liability policies shall contain the following:
1. An endorsement extending coverage to the City as an insured, in the same
SP-10
manner as the named insured as respects liabilities arising out of the performance of any work under the Contract. Such insurance shall be primary insurance as respects the interest of the City, and any other insurance maintained by the City shall be excess and not contributing insurance with the insurance required hereunder.
2. “Severability of Interest” clause.
3. Elimination of any exclusion regarding loss or damage to property caused by explosion or resulting from collapse of buildings or structures or damage to property underground, commonly referred to by insurers as the “XCU” hazards.
4. Provision or endorsement stating that such insurance, subject to all of its other terms and conditions, applies to the liability assumed by the Contractor under the Contract.
Promptly on execution of the Contract, and prior to commencement of any work, the Contractor shall deliver to the City copies of all required policies and endorsements thereto on the forms supplied by the City.
The Contractor shall require and verify similar insurance on the part of its subcontractors.
The foregoing requirements as to the types, limits and City approval of insurance coverage to be maintained by the Contractor are not intended to and shall not in any manner limit or qualify the liabilities and obligation assumed by the Contractor under the Contract.
Any policy or policies of insurance that the Contractor or his Subcontractors elects to carry as insurance against loss or damage to their construction equipment and tools or other personal property used in fulfillment of this Contract shall include a provision waiving the insurer’s right of subrogation against the City.
The cost of all insurance shall be included in the Contractor’s bid. 5-7 SAFETY.
Add the following subsection:
5-7.9 Emergency Provisions.
Unusual conditions may arise on the work which will require that immediate and unusual provision be made to protect the public from danger or loss or damage to life and property, due directly or indirectly to the prosecution of the work, and it is part of the service required of the Contractor to make such provisions and to furnish such protection.
Whenever, in the opinion of the City, an emergency exists of which the City is aware and against which the Contractor has not taken sufficient precaution for the safety of the public or the protection of utilities or of adjacent structures or property which may be injured by the progress of construction; and whenever, in the opinion of the City, immediate action shall be considered necessary in order to protect public or private personnel or property interests, or prevent likely loss of human life or damage on account of the operations under the Contract, then in that event the City may provide suitable protection to said interests by causing such work to be done and material to be furnished, as in the opinion of the City may seem reasonable and necessary, all at the expense of the Contractor.
Add the following subsections:
SP-11
5-8 LAWS TO BE OBSERVED.
5-8.1 Laws and Regulations.
The Contractor shall keep himself fully informed of all Federal and State laws, County and City ordinances and regulations which, in any manner, affect those engaged or employed on the work, the materials used in the work or the conduct of the work. If any discrepancy or inconsistency should be discovered in this Contract or in the Plans or Specifications herein referred to, in relation to any such law, ordinance or regulation, the Contractor shall forthwith report the same in writing to the Engineer. The Contractor shall, at all times, observe and comply with and shall cause all his agents and employees to observe and comply with all such applicable laws, ordinances and regulations in effect or which may become effective before completion of this Contract. He shall protect and indemnify the City and its officers and agents against any claim or liability arising from or based on the violations of any such laws, ordinances or regulations whether by himself or by his employees or his subcontractors or their employees.
Except as otherwise explicitly provided in these Specifications, all permits and licenses necessary to the prosecution of the work shall be secured by the Contractor at his own expense and he shall pay all taxes properly assessed against his equipment or property used or required in connection with the work.
All state laws, all county and city ordinances and regulations now imposed by competent authority and relating to any materials required to be furnished under these specifications and works required to be done hereunder, shall be deemed to be and hereby are made controlling and part of these specifications.
5-8.2 General.
The Contractor shall keep himself fully informed of all existing state and national laws and municipal ordinances and regulations which in any manner affect those engaged or employed in the work, or the materials used in the work or which in any way affect the conduct of the work and of all such orders and decrees of bodies or tribunals having any jurisdiction or authority over the same.
5-8.3 Eight-Hour Law.
Eight (8) hours labor constitutes a legal day's work. The Contractor shall forfeit as a penalty $25.00 (Twenty-five dollars) for each workman employed in the execution of the Contract by the Contractor or any subcontractor under him for each calendar day during which such workman is required or permitted to work more than eight (8) hours in any one calendar day and forty (40) hours in any one calendar week in violation of the provisions of the Labor Code and in particular, Section 1810 to Section 1815 thereof inclusive except that work performed by employees of Contractors in excess of eight (8) hours per day and forty (40) hours during any one week, shall be compensated at not less than one and one-half (1 1/2) times the basic rate of pay as provided in Section 1815.
SP-12
5-8.4 Prevailing Rate of Per Diem Wages.
Pursuant to the provisions of Section 1773 of the Labor Code, the general prevailing wage rates in the County in which the work is to be done have been determined by the Director of the California Department of Industrial Relations. These wages are set forth in the General Prevailing Wage Rates. Future effective general prevailing wage rates which have been predetermined and are on file with the California Department of Industrial Relations are referenced but not printed in the general prevailing wage rates.
The U.S. Department of Transportation (DOT) provides a toll-free “hotline” service to report bid rigging activities. Bid rigging activities can be reported Mondays through Fridays, between 8:00 a.m. and 5:00 p.m., eastern time, Telephone No. 1-800-424-9071. Anyone with knowledge of possible bid, Bidder collusion, or other fraudulent activities should use the “hotline” to report these activities. The “hotline” is part of the DOT’s continuing effort to identify and investigate highway construction Contract fraud and abuse and is operated under the direction of the DOT Inspector General. All information with be treated confidentially and caller anonymity will be respected.
The Contractor shall comply with Labor Code Section 1775. In accordance with said section, the Contractor shall forfeit as a penalty to the City $50.00 (fifty dollars) for each calendar day, or portion thereof, for each workman paid less than the stipulated prevailing rates for such work or craft in which such workman is employed for any work done under the Contract by him or by `any subcontractor under him in violation of the provisions of the Labor Code and in particular Labor Code Sections 1770 to 1780, inclusive. In addition to said penalty and pursuant to said Section 1775, the difference between such stipulated prevailing wage rates and the amount paid to each workman for each calendar day or portion thereof for which each workman was paid less than the stipulated prevailing wage rate shall be paid to each workman by the Contractor. 5-8.5 Certified Payroll.
Pursuant to Section 1776 of the Labor Code, the Contractor and/or subcontractors shall submit weekly to the City for each week in which any Contract work is performed a certified copy of all payroll records. Should the Contractor fail to provide such payroll certificates, the City may withhold.
$1,000.00 for each weekly payroll certificate not received from payment due. 5-9 FAIR EMPLOYMENT PRACTICE COMMISSION CERTIFICATION.
The Contractor's attention is directed to the requirements in Section 12990 of the Government Code for nondiscrimination and compliance employment programs.
SECTION 6 – PROSECTION AND PROGRESS OF THE WORK.
6-1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF THE
WORK.
6-1.1 Construction Schedule.
SP-13
Add the following:
The Contractor’s proposed construction schedule shall be submitted to the Engineer within ten (10) working days after the date of the Notice of Contract Approval. The schedule shall be supported by written statements from each supplier of materials or equipment indicating that all orders have been placed and acknowledged, and setting forth the dates that each item will be delivered.
In preparation of the construction schedule, the following items shall be considered:
• The City observes the following holidays, which shall be considered non-working days.
If the Contractor elects to work on any of the City holidays the Contractor shall be responsible for paying any associated inspection costs, including overtime and holiday premiums. Any work not completed and fully open to public traffic shall be maintained in a safe and delineated condition. Traffic control and safety devices shall be maintained at all times.
o New Year’s Day
o Martin Luther King Jr.’s Birthday
o Washington’s Birthday
o Cesar Chavez Day
o Memorial Day
o Juneteenth
o Independence Day
o Labor Day
o Veterans Day
o Thanksgiving
o Christmas Day
• The Contractor’s working hours shall be limited to the hours between 8:00 A.M. and 6:00 P.M., Monday through Friday. Deviation from normal working hours will not be allowed unless written permission has been duly obtained beforehand from the office of the City Engineer. The Contractor shall provide adequate light for proper prosecution of the work, for the safety of the workmen and the public, and for proper inspection. • In the event of either a requested or emergency deviation, inspection service fees will be charged against the Contractor. The service fees will be calculated at overtime rates including benefits, overhead and travel time. The service fees will be deducted from any amounts due to the Contractor.
Prior to issuing the Notice to Proceed, the Engineer will schedule a preconstruction meeting with the Contractor to review the proposed construction schedule and delivery dates, arrange utility coordination, discuss construction methods and clarify inspection procedures.
The names, addresses, and telephone numbers of the Contractor and subcontractors, or their representatives, shall be filed with the Public Works Manager and the County Sheriff’s Department or the City Police Department prior to beginning work.
The Contractor shall also notify the City of Hermosa Beach and the owners of all utilities and substructures not less than 72 hours prior to starting construction. The following utility
SP-14
companies list of names and telephone numbers is intended for the convenience of the Contractor and is not guaranteed to be complete or correct:
Southern California Edison Co. 310/783-9332
The Gas Co. 310/605-7837
Verizon 818/837-0394
Hermosa Beach Police & Fire 310/524-2750
Time Warner (Cable TV) 310/216-4184
West Basin Municipal Water District 310/217-2411
Athens Services 626/934-4696
California Water Service Co. 310/257-1428
Underground Service Alert 800/227-2600
Los Angeles County Flood Maintenance 562/861-0316
Los Angeles County Public Works 626/458-3109
The Contractor shall submit periodic Progress Reports to the Director of Public Works by the tenth day of each month. The report shall include an updated Construction Schedule. Any deviations from the original schedule shall be explained. Progress payments will be withheld pending receipt of any outstanding reports.
6-4.3 Payment for Delays.
To the furthest extent permitted by law, replace the entire subsection with the following:
In compliance with the provisions of California Public Contract Code § 7102, the Contractor will be compensated for damages incurred due to delays in completing the Work due solely to the fault of the City, where such delay is unreasonable under the circumstances and not contemplated by the parties. The Contractor and City agree that determining actual damages is impracticable and extremely difficult. As such, the Contractor shall be entitled to the appropriate time extension and to payment of liquidated damages in the sum of $1,200 per Day of delay in excess of the time specified for the Completion of the Work. Such amount shall constitute the only payment allowed and shall necessarily include all overhead (direct or indirect), all profit, all administrative costs, all bond costs, all labor, materials, equipment and rental costs, and any other costs, expenses and fees incurred or sustained as a result of such delay. The Contractor expressly agrees to be limited solely to the liquidated damages for all such delays as defined in this subsection. 6-9 LIQUIDATED DAMAGES.
Add the following:
The amount of liquidated damages is hereby amended to $1,200 for each consecutive calendar day.
SECTION 7 – MEASUREMENT AND PAYMENT.
SP-15
7-3 PAYMENT.
7-3.2 Partial and Final Payment.
Replace the entire subsection with the following:
The closure date for periodic progress payments shall be the twenty-fifth day of each month.
Authorization to pay is commonly received on the tenth day of the following month.
However, payments will be withheld pending receipt of any outstanding reports required by the Contract Documents.
The closure date for the purpose of making partial progress payments will be the last day of each month. The Contractor may request, in writing, that such monthly closure date be changed. The Engineer may approve such request when it is compatible with the AGENCY'S payment procedure. Each month, the Contractor shall meet with the Engineer, a minimum of three working days prior to the submittal of the progress payment to the AGENCY, to finalize and receive approval regarding the measurement of the Work performed through the closure date and the estimated value of the progress payment based on the contract Unit Prices or as provided for in the bid schedule. Any progress payment submitted without such approval will be considered incomplete and returned to the Contractor and no payment shall be considered until such approval is obtained. Payments will be withheld pending receipt of any outstanding reports required by the contract documents. In addition, the final progress payment will not be released until the Contractor returns the control set of specifications and plans indicating the as-built conditions. At the request and expense of the Contractor, who shall retain beneficial ownership and receive interest, if any thereon, the AGENCY shall permit the substitution and deposit therewith of securities equivalent to the amount of any monies withheld by the AGENCY.
At the expiration of 35 days from the filing and recording of the Notice of Completion of the Work, the amount deducted from the final estimate and retained by the AGENCY will be paid to the Contractor except such amounts as required to be withheld by properly executed and filed to stop payment, or as may be authorized by the contract.
7-4 BID ITEMS
7-4.1 TRAFFIC CONTROL & PUBLIC SAFETY The Contractor shall provide and maintain all construction area traffic controls in accordance with Section 7-10 of the Standard Specifications for Public Works Construction, the latest version of the California Manual on Uniform Traffic Control Devices (CA MUTCD), and Work Area Traffic Control Handbook (WATCH), and as noted herein. All necessary traffic control devices shall be in place prior to the start of work on a project section.
The Contractor shall so conduct his operations as to offer the least possible obstruction and inconvenience to public traffic, particularly in South Park’s parking lot. Every effort shall be made to provide a clear and unobstructed view of all traffic control signs, signals, or markers.
The Contractor shall maintain access for emergency vehicles at all times. The Contractor shall maintain a 24-hour emergency service to remove, install, relocate, and maintain warning devices
SP-16
and shall furnish to the Engineer, names, and telephone numbers of three persons responsible for this emergency service. In the event these persons do not promptly respond when notified, or it becomes necessary to call other forces to accomplish emergency service, the Contractor will be responsible for any cost incurred. All existing permanent traffic control signs, barricades and devices shall remain in effective operation unless a substitute operation is arranged for and approved by the Engineer.
Prior to the start of each workday, the Contractor shall perform all necessary work incidental to and commensurate with the proper signing, detouring, barricading, etc., heretofore and hereinafter specified that is required for that particular day's schedule of operations. No construction shall be permitted until such signing and detouring operations have been completed.
The Contractor may post "Temporary No Parking" signs only after notifying and receiving approval from the Engineer. Type of sign, method, and location of such posting shall conform to the State of California uniform sign chart. The Contractor shall be required to provide and maintain all necessary flag persons, barricades, delineators, signs, flashers, and any other safety equipment as set forth in the latest publication of the California MUTCD, or as required by the Engineer to insure safe passage of traffic.
The Contractor shall submit a traffic control and Phasing plan for approval prior to beginning construction. No work shall commence on a phase until the previous phase is completed unless approved by the Engineer. The Contractor shall include these sequences in his work progress schedule to be submitted. The Contractor shall provide written notification to all businesses and residents near the construction one week prior to the work start date. The notice shall be prepared by the contractor, approved by the City, distributed by the Contractor, and will include a preliminary schedule, name of the job superintendent/foreman and a telephone number where he can be reached 24 hours a day in case of emergency.
The cost for all project noticing will be included in the price of the traffic control. Failure or refusal by the Contractor to comply with the above requirements shall be sufficient cause for the Engineer to order the work done by City forces and all costs thereof to be borne by the Contractor.
Should the Contractor appear to be negligent in furnishing warning and protective measures as above provided, the Engineer may direct attention to the existence of a hazard, and the necessary warning and protective measures shall be furnished and installed by the Contractor, at his/her expense. Should the Engineer point out the inadequacy of warning and protective measures, such action on the part of the Engineer shall not relieve the Contractor from responsibility for public safety or abrogate its obligation to furnish and pay for these devices.
The Contractor shall provide access as required to accommodate special circumstance at any residence including access for disabled, impaired, special medical needs, etc.
PAYMENT FOR TRAFFIC CONTROL & PUBLIC SAFFETY shall be included in the cost for other items of work and shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals and for doing all the work involving placing, removing, storing,
SP-17
maintaining, moving to new locations, replacing and disposing of the components of traffic control system as specified in the Standard Specifications and these specifications, and as directed by the City. Progress payments for this item shall be paid in accordance with the completion percentage of the project. The lump sum price shall also include non-skid steel plates and temporary AC including installation and removal; all associated temporary signing and striping; flashing arrow signs; flagging and/or flagger costs; and project notifications where no additional compensation will be made thereof.
7-4.2 BEST MANAGEMENT PRACTICES
Per the Federal Clean Water Act, the Contractor is required to eliminate pollution to waters of the United States in regards to this project. This project will require the Contractor to implement Best Management Practices (BMP’s). The Contractor shall implement the Project’s Erosion Control Plan which outlines specific BMP’s to be used during construction to ensure that sediment from storm runoff and construction activities does not enter storm drains. Some of the primary water pollution control measures anticipated for this project include, but are not limited to, covering all storm drain inlets in the project vicinity with water permeable fabric and gravel bags prior to performing any removal or paving operations; properly fueling and cleaning all equipment/vehicles; maintaining an ample supply of gravel/sand bags on-hand in the event of rain; properly contain any chemicals; properly covering all incoming material trucks and all out going debris hauling vehicles; providing restroom facilities for workers; and regular street sweeping of the Work Area and Haul Routes to the satisfaction of the Engineer.
The requirements of all of the following agencies shall be met and maintained and where there is a conflict between requirements, the most stringent requirement shall govern. 1. Regional Water Quality Control Board 2. County of Los Angeles Flood Control Storm Water Quality.
The Contractor shall confirm that all of the BMP’s have been adequately detailed to address his anticipated construction operations.
PAYMENT FOR BEST MANAGEMENT PRACTICES shall be included in cost of the other items of work and provide full compensation for all costs incurred by the Contractor for Implementing Best Management Practices, complying with the requirements of the Project’s Erosion Control Plan and the cost of any required permits and no additional compensation will be made thereof.
7-3.4 MOBILIZATION
Mobilization and demobilization shall include all site visits; preparation of all submittals; BMPs; obtaining all permits, insurance, and bonds; video recording of the site existing conditions; moving onto the site all materials and equipment; set up of any temporary facilities (e.g. sanitary facilities, parking, construction water, equipment and materials staging area, distribution of all notification materials; removal of same at completion of the work; site cleanup; and other work as required to perform and complete the work.
No material, equipment, or vehicles to be left overnight on sidewalks or streets.
A minimum of one week prior to the start of construction, the Contractor shall video record all areas where construction is to take place. Such video recordings shall be provided to the Engineer
SP-18
before construction commences. These video recordings shall serve as a record of the existing conditions for disputes arising from restoration and should therefore be taken along the line of construction and site access and staging areas at sufficient detail as necessary to clearly depict details of existing conditions. Video recordings shall document existing sidewalks, and adjacent conditions. The video recordingsshall be on two USB copies and given to the Engineer. All video recordings shall be indexed and catalogued in such a manner that each photographed area is readily identifiable and shall also indicate the date and time (hour, minutes, and seconds) on which the recording was made. The Contractor shall also video record any unusual conditions encountered during construction that are not already a matter of photographic record. In any areas where existing conditions cannot be determined by means of video recording, the area shall be restored as approvedbytheEngineeratContractor's expense. Allvideorecordingsshall become the property of the City.
Mobilization shall consist of preparatory work and operations including, but not limited to, those necessary for the movement of personnel, equipment, materials and incidentals to the project site necessary for work on the project and for all other work and operations which must be performed or costs incurred including bonds, insurance, construction permits and/or permit riders as may be required by law, and financing prior to beginning work on the various contract items on the project site.
Mobilization shall also include the cost, time and labor to move the necessary construction equipment to and from the job site, supervisory time on the job by the Contractor's personnel to keep the construction site in a safe condition and all other related work as required for all nonworking days during the course of construction. Contractor is responsible for securing an adequate storage site for equipment and materials.
Mobilization shall include any work shown on the plans, including removal and/or relocation of an item of work shown on construction documents, which has no corresponding bid item for said work. This work shall include removal of vegetation, removal and/or modifications to the existing planters, wall, fences, gates within the project area, on private properties and within the public right of way as shown on the construction documents. Full compensation relating to that work, including the furnishing of labor and materials, and the disposal of materials shall be included herein.
Mobilization shall include compliance with water quality and air quality laws; furnishing all water required for the construction work; protection of utilities, trees, fences, walls, landscaping, and other facilities; and the relocations as shown on the plans. All complaints received by the City associated with the construction alleging damage to private property and vehicles shall be responded to by the Contractor within one working day of notification. Failure to comply with this provision may result in a penalty of one hundred and fifty dollars ($150.00) per occurrence.
The Contractor shall have on the work site at all times, as its agent, a competent superintendent capable of reading and thoroughly understanding the plans, specifications, other related documents, and directions from the Engineer.
Contractor shall confine his operations and work area within the project area. No encroachment into private property will be permitted without the prior written consent of the property owner.
Obtaining this consent will be the responsibility and the costs of the Contractor. Material shown
SP-19
on the plans or designated in the Special Provisions which is to be used in the reconstructed work and which has been damaged or destroyed as a result of the Contractor’s operations shall be repaired or replaced at the option of the Engineer by the Contractor at the Contractor’s sole expense.
The Contractor shall provide personnel to keep the construction site in a safe condition at all times, including non-working hours. Mobilization shall include scheduling and phasing of the work per the requirements of the City. The Contractor shall coordinate all construction activities with the City.
PAYMENT FOR MOBILIZATION shall be per the Lump Sum (LS) price bid not exceeding 5% of the total bid amount for the project and shall include obtaining and paying for all bonding, insurance, business licenses and permits, as required for entire project, from the City of Hermosa Beach and all related agencies including but not limited to utility companies and private and public agencies. The City of Hermosa Beach will waive its permit fee.
The Contractor shall comply with the requirements specified by each license or permit.
Compensation also includes furnishing a crew to pothole at the discretion of the Engineer.
Progress payments for this item shall be paid in accordance with the completion percentage of the project and shall include the costs of such mobilization and administration for the entire contract period.
7-4.4 SURVEY & CONSTRUCTION STAKING
Contractor shall complete all necessary survey and construction staking required to complete the work per these specifications and project’s plans.
PAYMENT FOR SURVEY & CONSTRUCTION STAKING shall be included in the cost of other items of work and shall include furnishing all labor, equipment, tools and materials necessary for the item of work involved in survey and construction staking required to complete the work and no additional compensation will be allowed thereof. 7-4.5 TEMPORARY CONSTRUCTION FENCING
It shall be the contractor’s responsibility to verify the limits of construction fencing with the City inspector.
PAYMENT FOR TEMPORARY CONSTRUCTION FENCING shall be made at the contract unit price per Lump Sum (LS) and shall include furnishing all labor, equipment, tools and materials necessary for the item of work. No additional compensation will be allowed thereof.
Temporary construction fencing shall remain in place and properly maintained by the contractor throughout the duration of the project including the “establishment period” as prescribed in these documents.
7-4.6 SITE CLEARING
Site Clearing shall conform to Subsection 300-1 of the GREEN BOOK as well as Section 31 10 00 of the Technical Provisions, and shall include all clearing and grubbing for the construction of
SP-20
the new improvements, and any clearing and grubbing and/or removal and replacement shown on the plans for which there is no bid item of work.
Site Clearing shall include the removal and disposal of existing concrete, existing foundations and concrete bae for existing benches, existing lawn and planting areas, existing irrigation systems within the limits of work, and other items as shown on the plans and as directed by the City. Contractor shall coordinate with the City prior to the removal of the planting for potential salvaging. Any improvements, landscaping and irrigation destroyed by construction operations shall be replaced by the Contractor. Any replacement including plant materials and irrigation system shall be approved by the City prior to any construction. The Contractor shall control any dust that is caused by clearing and grubbing operations. No additional compensation will be allowed for removal or disposal of any other materials, which may require special handling or disposal.
PAYMENT FOR SITE CLEARING shall be made at the contract unit price per Square Foot (SF) and shall include furnishing all labor, equipment, tools and materials necessary for the item of work. No additional compensation will be allowed thereof. Progress payments for this item shall be paid in accordance with the percentage of total contract work performed. 7-4.7 IRRIGATION SYSTEM
Refer to Section 32 84 00 (Technical Provisions).
PAYMENT FOR INSTALLION OF NEW IRRIGATION SYSTEM as shown on plans and specified herein shall be made at the contract unit price per Lump Sum (LS) and shall include furnishing all labor, equipment, tools and materials necessary for the item of work including but not limited to excavation, backfilling, compaction of trenches for installation of irrigation lines, nozzles, spray heads, valves, sleeving, quick couplers and irrigation controller. No additional compensation will be allowed thereof.
7-4.8 CAST-IN-PLACE CONCRETE PAVING (4” THICK)
Refer to Section 32 13 13 and 32 13 23 (Technical Provisions) Construction of 4” thick Cast-in-Place Concrete Paving shall conform to Section 303-5 of the Standard Specifications and the Project Plans with lines and grades to meet existing. In order to meet ADA requirements, cross slope of new paved surfaces shall be 2%. The remaining concrete adjacent to new paved areas shall be protected in-place and intact. Any damage caused by the Contractor shall be replaced at no cost to the City. The Contractor shall protect all existing drainage pipes and structures and other existing improvements not designated to be removed inplace and intact.
The Contractor shall trim trees; trimming and/or removing shrubs; removing tree roots encountered within paving areas, including saw-cutting and disposing of roots, reconstruction of existing sprinkler systems to match new configurations, soil import (if necessary), backfilling as
SP-21
necessary, grading and compacting; disposal of excess excavated materials and all construction debris. All new improvements will match the existing grades, design and color of existing adjacent concrete within the work area and/or be in accordance with Standard Plans for Public Works Construction, published by BNI.
Miscellaneous Work The following miscellaneous work shall be included in the scope of work for the bid items stated:
1. Adjusting all existing irrigation control boxes, conduits, and conductors etc. to grade
2. Protecting and supporting all existing improvements, not designated to be removed, adjoining and adjacent new improvements including, but not limited to, walls, fences, brick work, PCC, etc.
3. Providing forms; excavating, backfilling and compacting form areas.
4. Disposing of all excavated and removed materials (including PCC, AC, CMB, CTB, slurry backfill, dirt, ivies, plants, trees, roots, stumps, branches, grass, bricks, fences, woods, etc.)
5. Cutting and replanting existing turf to meet walkway.
6. Replacing any broken, cracked, or otherwise damaged water meter boxes and lids prior to placement of walkway.
7. Restoring and replacing all landscaping and irrigation systems.
MATERIAL - Concrete shall be Class 520-C-2500.
PAYMENT FOR CAST IN PLACE CONCRETE PAVING (4” THICK) shall be made at the contract unit price per Square Foot (SF) and shall include furnishing all labor, equipment, tools and materials necessary for the item of work including unclassified excavation, removal of existing improvements and materials, preparation of subgrade, construction of cast-in-place concrete, irrigation repair, landscaping restoration, adjustment of miscellaneous utility items found within the limits of construction and finishing. No additional compensation will be allowed therefor.
7-4.9 REMOVAL AND RE-INSTALLTION OF PARK BENCHES
Refer to Section 12 93 00 (Technical Provisions).
PAYMENT FOR REMOVAL AND RE-INSTALLTION OF EXISTING PARK BENCHES shall be made at the contract unit price per Each (EA) and shall include furnishing all labor, equipment, tools and materials necessary for removal , protection and temporary storage of the existing park benches, complete removal of concrete bases (under each leg of the bench), all necessary grading and backfilling, and repair of benches necessary for re-installation of park benches by anchoring each leg to new concrete pad, as shown on the plans. No additional compensation will be allowed therefor.
7-4.10 STABILIZED DECOMPOSED GRANITE (4” THICK)
Refer to Section 32 15 13 (Technical Provisions).
SP-22
PAYMENT FOR STABILIZED DECOMPOSED GRANITE (4” THICK) shall be made at the contract unit price per Square Foot (SF) and shall include furnishing all labor, equipment, tools and materials necessary for the item of work. No additional compensation will be allowed thereof.
7-4.11 SOIL PREPARATION AND FINE GRADING
Refer to Sections 32 90 00, 32 22 19 and 32 91 13
PAYMENT FOR SOIL PREPARATION AND FINE GRADING shall be included in bid price for other items of work and shall include furnishing all labor, equipment, tools and materials necessary for the item of work. No additional compensation will be allowed thereof. 7-4.12 WEED ABATEMENT
Refer to Sections 32 90 00 and 32 98 13
PAYMENT FOR WEED ABATEMENT shall be included in bid price for other items of work and shall include furnishing all labor, equipment, tools and materials necessary for the item of work. No additional compensation will be allowed thereof.
7.4.13 INSTALLATION OF STEEL HEADER
Refer to Section 32 94 00
PAYMENT FOR INSTALLATION OF STEEL HEADER as shown on the plans shall be made at the contract unit price per linear foot (LF) and shall include providing all required labor, material, tools and equipment necessary for excavation, removal and disposal of soil to accommodate complete installation, of the steel header as specified. No additional compensation will be allowed thereof.
7.4.14 CMU BLOCK WALL AND CAP
Refer to Sections 04 22 00 and 32 13 23 (Technical Provisions) PAYMENT FOR CONSTRUCTION OF CMU WALL AND CAP as shown on the plans shall be made at the contract unit price per linear foot (LF) and shall include providing all required labor, material, tools and equipment necessary for excavation, removal and disposal of soil to accommodate construction of the wall, construction of foundation and complete construction of the Concrete Masonry Unit block wall and cap and finish as specified. No additional compensation will be allowed thereof.
SP-23
7-4.15 RELOCATING AND SETTING EXISTING BOULDERS IN CONCRETE -Boulder Sizes greater than or equal to 24”
PAYMENT FOR RELOCATING EXISTING BOULDERS as shown on plans and as directed by the City Engineer and setting them in concrete shall be made at the Each (EA) bid price and shall include furnishing all labor, equipment, tools and materials necessary for the item of work including reinstallation of boulders in cement base as Directed by the City Engineer. No additional compensation will be allowed thereof.
7-4.15.1 RELOCATING AND SETTING EXISTING BOULDERS IN CONCRETE – Boulder Sizes 12”-24”
PAYMENT FOR RELOCATING EXISTING BOULDERS as shown on plans and as directed by the City Engineer and setting them in concrete shall be made at the Each (EA) bid price and shall include furnishing all labor, equipment, tools and materials necessary for the item of work including reinstallation of boulders in cement base as Directed by the City Engineer. No additional compensation will be allowed thereof.
7-4.15.2 REMOVE AND SALVAGE - EXISTING BOULDERS LESS THAN 12” WIDE PAYMENT FOR REMOVING AND SALVAGING EXISTING BOULDERS as shown on plans and as directed by the City Engineer and setting them in concrete shall be made at the Each (EA) bid price and shall include furnishing all labor, equipment, tools and materials necessary for the item of work including reinstallation of boulders in cement base as Directed by the City Engineer. No additional compensation will be allowed thereof. 7-4.16 REPAIR OF TIMBER STAIRS
PAYMENT FOR REPAIR OF TIMBER STAIRS as shown on plans and as directed by the City Engineer shall be made at the Each (EA) bid price and shall include furnishing all labor, equipment, tools, materials and equipment necessary for excavation, removal and disposal of existing improvements and materials, preparation of subgrade, construction of new steps, irrigation repair, landscaping restoration, and finishes as Directed by the City Engineer. No additional compensation will be allowed thereof.
7-4.17 TREES - 24” BOX
Refer to Sections 32 91 13, 32 93 00 and 32 94 00 (Technical Provisions).
PAYMENT FOR PROVIDING AND INSTALLING 24” BOX TREES shall be made at the contract unit price per Each (EA) and shall include furnishing all labor, equipment, tools and materials necessary for the item of work. No additional compensation will be allowed thereof. 7-4.18 SHRUBS – 1 GALLON
SP-24
Refer to Sections 32 91 13, 32 93 00 and 32 94 00 (Technical Provisions).
PAYMENT FOR PROVIDING AND INSTALLING 1 GALLON SHRUBS –shall be made at the contract unit price per Each (EA) and shall include furnishing all labor, equipment, tools and materials necessary for the item of work. No additional compensation will be allowed thereof. 7-4.19 SHRUBS – 5 GALLON
Refer to Sections 32 91 13, 32 93 00 and 32 94 00 (Technical Provisions).
PAYMENT FOR PRODING AND INSTALLING 5 GALLON SHRUBS –shall be made at the contract unit price per Each (EA) and shall include furnishing all labor, equipment, tools and materials necessary for the item of work. No additional compensation will be allowed thereof. 7-4.20 SHRUBS – 15 GALLON
Refer to Sections 32 91 13, 32 93 00 and 32 94 00 (Technical Provisions).
PAYMENT FOR PROVIDING AND INSTALLING 1 GALLON SHRUBS –shall be made at the contract unit price per Each (EA) and shall include furnishing all labor, equipment, tools and materials necessary for the item of work. No additional compensation will be allowed thereof. 7-4.21 REMOVE AND INSTALL TURF-SOD
Refer to Sections 32 91 13, 32 92 00 and 32 94 00 (Technical Provisions).
PAYMENT FOR REMOVAL AND INSTALLMENT OF NEW TURF-SOD shall be made at the contract unit price per Square Foot (SF) and includes but is not limited to furnishing all labor, equipment, tools and materials necessary for the item of work, including fine grading, adding approved soils and amendments and installation of new turf . No additional compensation will be allowed thereof.
7-4.22 INSTALLATION OF WOOD MULCH (3” LAYER)
Refer to Section 32 94 00 (Technical Provisions).
PAYMENT FOR WOOD MULCH (3” LAYER) shall be made at the contract unit price per Cubic Yard (CY) and shall include furnishing all labor, equipment, tools and materials necessary for the item of work. No additional compensation will be allowed thereof. 7-4.23 LANDSCAPE ESTABLISHMENT PERIOD
Refer to Section 32 98 13 (Technical Provisions).
The contractor shall perform work under this section consisting of the following, for a frequency at a minimum of once per week, for a duration of a minimum of 90 calendar days:
SP-25
1. Litter Control
2. Weed Control
3. Pest Control
4. Plant Care
5. Fertilization of Plant Materials
6. Plant Replacement
7. Plant Pruning
8. Plant Staking and Adjustments
9. Temporary Plant Protection
10. Operation, Adjustment, and Maintenance of Irrigation Controller and Irrigation System
11. Cleaning of Paving Surfaces
12. Reapplication of Mulching Materials
13. Erosion Control and Drainage
14. Removal of Green Waste
Contractor shall also perform adequate maintenance of turf grass for duration of establishment period, this work shall include irrigation, weed control, minimum one mowing to maintain uniform growth and height, reseeding/overseeding, aeration and fertilization.
PAYMENT FOR LANDSCAPE ESTABLISHMENT PERIOD as indicated in technical provisions for a duration of 90 calendar days shall be made at the contract unit price per Lump Sum (LS) and shall include furnishing all labor, equipment, tools and materials necessary for the item of work. No additional compensation will be allowed thereof.
Add the following subsection:
7-5.1 Work Performed Without Direct Payment.
Tools and materials of any class for which no price is fixed in the Proposal, it shall be understood that such work, equipment, labor, tools, and materials shall be provided without extra charge, allowance, or direct payment of any kind. The cost of performing such work or furnishing such equipment, labor, tools, and materials shall be included in the unit bid prices in the Proposal and no additional compensation will be paid thereof.
7-5.2 Basis for Establishing Costs.
7-5.2.1 Labor.
Replace the entire subsection with the following:
The costs of labor will be the actual cost for wages of workers performing the extra work at the time the extra work is done, plus the employer payments of payroll taxes, health and welfare, pension, vacation, apprenticeship funds, and other direct costs, resulting from Federal, State, or local laws, as well as assessments or benefits required by collective bargaining agreements. 7-5.3 Markup
7-5.3.1 Work by the Contractor.
SP-26
Replace the entire subsection with the following:
An allowance for overhead and profit shall be added to the Contractor’s costs and shall constitute the full and complete markup for all overhead and profit on extra work performed by the Contractor. The Contractor shall also be compensated for the actual increase in the Contractor’s bond premium caused by the extra work. The markup shall be:
a. Labor – 20%
b. Materials – 15%
c. Tool and Equipment Rental – 15%
d. Other Items – 15%
7-5.3.2 Work by a Subcontractor.
When any of the extra work is performed by a subcontractor, the markup shall be applied to the subcontractor’s costs. An allowance for the Contractor’s overhead and profit shall be added to the sum of the subcontractor’s costs and markup and shall constitute the full and complete markup for all overhead and profit for the Contractor on work by the subcontractor. For Contractor markup of subcontractor’s costs, the allowance shall be 10% on the first $2,000 or portion thereof and 5% on costs in excess of $2,000.
SP-27
PART 2 – CONSTRUCTION MATERIALS
SECTION 200 – ROCK MATERIALS.
200-2 UNTREATED BASE MATERIALS.
200-2.1 General.
Replace the entire subsection with the following:
Materials for use as untreated base or subbase shall be crushed miscellaneous base.
SECTION 201 – CONCRETE, MORTAR, AND RELATED MATERIALS.
201-1 PORTLAND CEMENT CONCRETE.
200-1.1 General.
Add the following:
Concrete shall be type 520-C-2500 PSI concrete per the City of Hermosa Beach Standard Plans for Public Works No. 106.
SP-28
PART 3 – CONSTRUCTION METHODS
SECTION 300 – EARTHWORK.
300-1 CLEARING AND GRUBBING.
300-1.2 Root Pruning and Tree Trimming.
Replace the entire section with the following:
a. Equipment
Pruning of roots shall be done using a Vermeer trenching machine with a root pruning attachment or a comparable piece of equipment, as approved by the Engineer. The equipment shall safely cut a narrow trench four to six inches wide to accommodate the installation of the root barrier.
Where sidewalks, curb ramp, or curbs are removed, the roots can be severed at the point adjacent to the edge of the new sidewalk, curb ramp, or curb to be installed, using other pneumatic tools to make the break-out and removal work more efficient.
Any roots over three inches in diameter must be cleanly cut using a chain saw or other sawing tool before the barrier is installed and the trench backfilled. b. Execution
Tree roots and other objectionable material shall be removed from areas of construction to a depth of 6 inches below the bottom of concrete. Tree roots shall be removed from parkways if visible or if instructed by Engineer.
Cleanly cut roots do not need to be painted or treated in any way other than the installation of root deflection barrier.
300-1.4 Payment.
Replace the entire subsection with the following:
There shall be no separate payment for root pruning or tree trimming; all costs thereto shall be considered included in the Contract unit prices for the items of work for which the pruning or trimming is required.
There shall be no separate payment for clearing and grubbing; all costs thereto shall be considered included in the Contract unit prices for the items of work for which clearing and grubbing is required.
SP-29
PART 4 – EXISTING IMPROVEMENTS
SECTION 400 – PROTECTION AND RESTORATION.
Add the following subsections:
400-4 TREES.
The Contractor shall take care to protect all trees not approved for removal by the Engineer.
There shall be no separate payment for protection of existing trees; all costs thereto shall be considered included in the Contract unit prices for the items of work for which the protection is required.
PART 8 – LANDSCAPING AND IRRIGATION
SECTION 800 – MATERIALS.
800-1 LANDSCAPING MATERIALS.
800-1.1 NOT USED.
800-1.4.2 Trees.
Add the following:
New trees furnished by the Contractor shall be 24 inch box trees.
Add the following subsection:
800-1.4.2.1 DELIVERY, STORAGE, AND HANDLING OF TREES
Trees shall not be pruned before delivery. Contractor shall protect trunks, fronds, growing tips, and root systems from sun scald, drying, sweating, whipping, and other handling and tying damage during transport. Tree shall not be bent or bind-tie trees in such a manner as to destroy natural shape. Trees shall be covered and protected during delivery.
Immediately after digging field-grown trees wrap root systems in wet burlap or other suitable material to keep root system constantly moist until installation at the project site. Deliver freshly dug field-grown trees with firm, natural balls of earth of sufficient depth to include fibrous and feeding roots. Protection of trees during harvesting, transport, and storage shall be the Contractor’s responsibility. Contractor shall investigate the specific species requirements of storing prior to performing any Work.
Handling Trees:
Lift and handle trees with extreme care. Remove wrappings or containers (where applicable) carefully. If root ball is cracked or broken during handling, tree will be rejected and a new one shall be furnished by the Contractor at no additional cost to the City. a. Handle container-grown tree(s) only by its container. b. Contractor shall not handle tree(s) by its fronds or root ball. c. Contractor shall not drop any tree(s).
SP-30
d. Contractor shall not bind or handle tree(s) directly with wire or rope at any time. Pad trunk of tree(s) whenever using hoisting cables, chains, slings, or straps. e. Climbing Spikes: Use of climbing spikes for any work performed on tree(s), pre or postinstallation, is prohibited. f. Should Contractor engage in handling any tree(s) by unacceptable method(s) the City shall reserve the right to reject any of the mishandled tree(s). Contractor shall replace rejected tree(s) with approved tree, at no additional cost to the City. g. Deliver tree(s) only after preparations for planting have been completed and a minimum amount of time elapses between delivery to site and installation. If planting is delayed more than six (6) hours after delivery, set tree(s) in shade, protect from weather and mechanical damage, and keep roots moist. Do not remove container-grown tree stock from containers before time of planting.
h. Labeling: For all field-dug tree(s), attach label to tree showing genus, species, variety, height, name of grower point of origin. For containerized tree, furnish standard products in standard containers bearing original labels. Legibly show genus, species, variety, and name of grower.
SP-31
SECTION 801 – INSTALLATION.
801-2 NOT USED.
801-4 PLANTING.
801-4.5 Tree and Shrub Planting.
Replace the entire subsection with the following:
Installation practices of the trees shall be performed during those periods when weather and soil conditions are suitable and in accordance with locally accepted horticultural practices.
Soil moisture levels prior to planting shall be no less than seventy-five percent (75%) of field capacity. The determination of adequate soil moisture for planting shall be in the sole judgment of the Public Works Inspector, and their decision shall be final. a. If the soil moisture level is found to be insufficient for planting installation, planting pits shall be filled with water and allowed to drain before commencing planting operations. b. Any planting area that may become compacted in excess of eighty-five-percent (85%) relative compaction (due to construction operations or other activities during the Contract) shall be tilled and thoroughly cross-ripped to a minimum depth of nine-inches (9”) to alleviate the condition, taking care to avoid all existing subsurface utilities, drainage, etc. c. Contractor shall notify the Engineer, in writing, on the anticipated commencement date and length of duration of the landscape installation.
d. Contractor shall confirm with the Engineer locations of all trees prior to planting. e. No more plant materials and trees shall be distributed in the planting area on any day than can be installed and watered on that day. Trees shall be planted and watered immediately after the removal of their containers, as applicable.
f. Contractor shall protect existing and new improvements and systems installed prior to planting installation, and shall protect in place until completion of work. g. Planting holes shall be approximately square with vertical sides twice the depth and width of the plant container or ball, and shall larger if necessary to permit handling and planting without injury or breakage of the root ball or root system. h. The native soil at the bottom of planting holes shall be scarified to a depth of 6”. i. A layer of prepared soil mix shall be deposited in the planting hole. j. The tree shall be set approximately at the center of the hole. k. Prepared soil mix shall be deposited in the remainder of the hole to finish grade. l. The backfill shall be thoroughly water-settled and additional prepared soil mix added to fill any remaining void below finish grade.
m. Planting holes shall be backfilled with a prepared soil mix. Soil shall consist of 50% of the specified topsoil, and 50% organic soil amendment.
Trees shall be installed with root barriers if specified on plans and in accordance with the installation procedure described in Section 801-11.
PART 9 – SPECIFIC CONDITIONS
Section 900 -WORK AREA
SP-32
900-1.1 Park Access
The subject work area is the northerly portion of the South Park. The southerly portion of the park which includes play field area, walkways and seating areas shall remain open to the public during the course of construction. Contractor shall provide, install and maintain, in good condition and at all times, temporary fencing around the perimeter of the designated work area. 900-1.2 Contractor Laydown and Storage Area
Contractor’s laydown and storage area shall be located within the work area related to the scope of work and shall remain secured and separated from the rest of the park by the contractor installed temporary fencing.
Section 901- CONSTRUCTION MANAGEMENT SOFTWARE
900-1.1 Procore Software
The contractor shall use the Procore construction management software (with account for the project made available by the City at no additional cost) for various construction management activities related to the project including but not limited to submission of schedules, project material submittals, and RFIs. Project documents including plans and specifications will also be made available on Procore for the contractor’s use for the duration of the project.
SP-33
EXHIBIT “A” – SCHEDULE OF PERFORMANCE
CIP 603 SOUTH PARK SLOPES AND IRRIGATION REPAIRS
SECTION 1. BEGINNING OF WORK, TIME OF COMPLETION
1. Attention is directed to the provisions of Section 6-1 ("Construction Schedule and Commencement of the Work"), Section 6-1.1 ("Construction Schedule"), and Section 6-9 ("Liquidated Damages"), of the State Specifications, and these Provisions.
2. The Contractor shall complete work within seventy-five (75) working days after receiving the "Notice to Proceed". After completion of work, the contractor shall maintain the work for an additional ninety (90) calendar days for the purpose of plant and grass establishment.
3. The Contractor and its securities will pay the sum of one thousand two hundred dollars ($1,200) as liquidated damages for each consecutive calendar day of delay in the performance of the work in this agreement and as shown on the plans.
SP-34
EXHIBIT “B” – SOLID WASTE REPORTING
CIP No. 603 SOUTH PARK SLOPES AND IRRIGATION REPAIRS
SOLID WASTE REPORTING
Pursuant to the California Integrated Solid Waste Management Act of 1989, the City is required to report the amount of solid waste generated within the City and the disposal of that waste with the ultimate required goal of being a reduction of at least 50% in the amount of solid waste being disposed in landfills. To permit the City to comply with this State law, the Contractor is required to complete the Solid Waste Report form, a copy of which is included in these special provisions.
The report includes a summary of the solid waste generated by the project, a summary of solid waste disposed of at class III landfills and a summary of solid waste diverted form disposal through recycling and re-use. The Contractor may use a self-generated report format that includes all of the information included on the City form.
The report shall be filed with the City after project completion and prior to final payment. If the project time span includes more than one calendar year, a separate report is required for the solid waste in each calendar year. A report for a calendar year that does not coincide with project completion shall be filed with the City on or before January 31st.
Supporting documents to be submitted with the report shall include legible copies of weigh tickets, receipts, or invoices that specifically identify the job site location that generated the waste materials. If materials are taken to a location where weigh tickets, receipts, or invoices are not available, the Contractor shall provide the documentation on its own company letterhead.
The Contractor is encouraged to divert solid waste from disposal at landfills through recycling and re-use when possible while maintaining compliance with all other Contract specifications and special provisions.
SP-35
SP-36
EXHIBIT “C” – CONSTRUCTION NOTICE TEMPLATE
COMPANY LETTERHEAD
NOTICE OF WORK/CONSTRUCTION
Name of Project Date of Notice
Dear Residents and Businesses (if applicable):
Provide a brief description of the work that is to be performed. Four to five sentences should suffice.
What: Provide a brief description of what
is happening. One sentence should suffice.
Start/Duration: When is the project
expected to start and how long is it
anticipated to take for it to be completed?
If there are different phases, indicate the
estimated time.
What to Expect: Will there be noise? Will
there be flaggers directing traffic? Will
residents have access or will it be a full
closure? Will parking be temporarily
blocked? Include enough details.
Equipment in Use: What kind of
equipment will be seen?
Working Hours: What are the working
hours and days?
Contact Information
Always include contact information for residents and business owners in case they have questions or concerns.
We apologize for any inconvenience and thank you for your patience. Sincerely, Contractor Name
Map detailing what
streets will be closed.
SP-37
EXHIBIT “D”- HAUL ROUTES
AWARD OF
CONSTRUCTION
CONTRACT FOR
CIP 603 SOUTH PARK IRRIGATION AND
LANDSCAPE IMPROVEMENTS
Background
Project Area
Restroom Community
Garden
Background – Existing Conditions
Background – Existing Conditions
Background – Landscape Improvements
Background
Project advertised for construction bids on November 21, 2024. Bids were opened on January 28, 2025.
Analysis
Bidder Bid Amount
1. Superb Engineering, Inc $393,273.20
2. Marina Landscape Inc $658,703.00
3. KASA Construction, Inc $659,980.00
4. Armstrong Cal Builders Inc $827,245.00
5. Leonida Builders Inc $977,157.00
6. Venture Construction & Management $998,204.00
7. SDC Engineering Inc $1,074,617.30
8. Los Angeles Engineering, Inc $1,184,000.00
Analysis
Review of the bid for completeness and accuracy:
1. Bid Form
2. Bid Bond
3. Qualifications verification and reference check
4. CA State Contractor’s license verification
5. Subcontractor’s list
6. Bidder Assurance and Non-Collusion Affidavit forms
7. Eligibility to Contract and Non-Discrimination forms
8. Good standing with DIR for labor compliance
The 1st lowest bidder, Superb Engineering, Inc. was found to be the lowest responsible and responsive bidder.
Analysis
Anticipated Schedule:
Start: ~April 2025
Finish: ~September 2025
Construction management and inspection to be provided by SWA and City staff.
Recommendation
1. Award construction contract for CIP Project 603 South Park Slope, Irrigation, and Landscape Improvements to Superb Engineering, Inc. in the amount of $393,273.20;
2. Authorize Director of Public Works to establish contract contingency in the amount of $60,000 (~15%) and approve contract change orders up to that amount;
3. Adopt resolution Approving the Construction of CIP 603 Pursuant to Government Code Section 830.6 and Establishing a Project Payment Account;
4. Authorize the Mayor to execute the construction contract and the City Clerk to attest, subject to approval by the City Attorney;
5. Accept $96,242 in grant funds from the Metropolitan Water District of Southern California (MWD) Turf Removal Grant for CIP 603 project reimbursement;
6. Appropriate $96,242 and add estimated revenue of $96,242 in the Grants Fund for the MWD Turf Removal Grant for CIP 603 project reimbursement;
7. Release $96,242 of CIP 603 project budget back to the Capital Improvement Fund balance; and
8. Authorize the Director of Public Works to file a Notice of Completion following final completion of the project. Page 1370 of 1852
City of Hermosa Beach | Page 1 of 7
Meeting Date: February 25, 2025
Staff Report No. 25-PW-011
Honorable Mayor and Members of the Hermosa Beach City Council AWARD OF CONSTRUCTION FOR CIP 619–KELLY COURTS IMPROVEMENTS CEQA: The Project is exempt under the California Environmental Quality Act (“CEQA”) pursuant to CEQA Guidelines section 15301 (Existing Facilities) and section 15302 (Replacement and Reconstruction). The proposed work is an alteration of existing public structures or facilities involving negligible or no expansion of existing use. Further the proposed work consists of reconstruction of existing court structures where the new courts will be located on the same site as the structure replaced and will have substantially the same purpose and capacity as the structure replaced. No exceptions to the CEQA exemption apply.
(Public Works Director Joe SanClemente)
Recommended Action:
Staff recommends City Council:
1. Award a construction contract for Capital Improvement Program (CIP) Project 619–Kelly Courts Improvements to KYA Services, LLC. in the amount of $797,766 (Attachment 1), ratifying City staff determination that lower bids were nonresponsive (lowest-bid) and non-responsible (second lowest-bid) as applicable;
2. Authorize the Director of Public Works to establish a project contingency amount of $160,000 and to approve contract change orders up to the amount of the approved project contingency;
3. Adopt the attached resolution entitled “A Resolution of the City Council of the City of Hermosa Beach Approving the Construction of CIP 619 Kelly Courts Improvements Pursuant to Government Code Section 830.6 and Establishing a Project Payment Account” (Attachment 2);
4. Authorize the Mayor to execute the construction contract and the City Clerk to attest, subject to approval by the City Attorney; and
5. Authorize the Director of Public Works to file a Notice of Completion following final completion of the project.
Executive Summary:
CIP 619–Kelly Courts Improvements includes, but is not limited to, renovating the existing pickleball, tennis, and basketball courts, collectively identified as Kelly Courts. Staff received six bids for the construction of the project and recommends City Council award a construction contract to the lowest responsible and responsive bidder, KYA Services, LLC.
City of Hermosa Beach | Page 2 of 7
Background:
In 2017, Council approved the conversion of one of the two tennis courts located at the Kelly Courts into four permanent pickleball courts, reflecting the sport's growing popularity and the community's commitment to an active lifestyle. In summer of 2020, two of the four pickleball courts were closed due to safety concerns. Over time, the increased usage and exposure to environmental elements at the Kelly Courts have led to noticeable wear and tear on the court surfaces and fencing. To address these concerns and ensure the facilities meet established standards for the courts’ layout and dimensions, the City initiated CIP 619–Kelly Courts Improvements.
The project includes:
Court restriping to meet standards for each court’s layout and dimensions recommended by USA Pickleball Association and American Institute of Architects (AID) for recreational play;
Court resurfacing;
Wall replacement west of the pickleball and tennis courts; New interior fencing;
New vinyl coated mesh fabric for all fencing;
New wind screens;
New court lighting system for the pickleball and tennis courts; New basketball posts with safety pole pad, nets, and backboards; New Americans with Disabilities (ADA) compliant concrete walkway from the adjacent parking lot to the west side of the courts.
The proposed improvements aim to revitalize the Kelly Courts, ensuring they serve as a premier recreational facility for Hermosa Beach residents and reaffirm the City’s dedication to providing recreational amenities that promote health and wellbeing within the community. In addition, the improvements would allow for the reopening of the two temporarily closed south pickleball courts providing a total of four pickleball courts as approved by City Council at its March 28, 2017 meeting.
Past Commission and Council Actions
Meeting Date Description
March 7, 2017 The Parks, Recreation, and Community Resources Advisory Commission (Commission) held a public hearing
and recommended Council approve permanently
converting the westernmost Kelly tennis court to four
permanent pickleball courts.
March 28, 2017 City Council held a public hearing and approved the Commission’s recommendation to permanently convert the
City of Hermosa Beach | Page 3 of 7
Meeting Date Description
westernmost Kelly tennis court to four permanent pickleball courts.
Analysis:
In December 2024, staff issued Notice Inviting Bids 24-011 inviting experienced and qualified construction firms to submit a bid for construction of the project through a competitive process. The notice was advertised in the Easy Reader, on the City’s website, the City’s online bidding platform, PlanetBids, and in relevant construction trade journals.
During the advertisement period, 72 prospective bidders downloaded the project documents from PlanetBids, including general contractors and subcontractors. Staff held a pre-bid site walk on January 14, 2025, attended by 10 participants.
On January 23, 2025, the City received a total of six bids, which were opened and read aloud by the City Clerk. The bid results are provided in Attachment 3 and summarized below.
Bid Results
BIDDER BID AMOUNT
Concept Consultant, Inc. $745,206.59
ARIX, Inc. $747,966.00
KYA Services, LLC $797,766.00
US Builders & Consultants $887,900.00
CSI Services $912,591.20
HZS Engineering, Inc. $997,567.00
All six bids are within the available funding for the project identified in the Fiscal Year 2024–25 budget. Staff reviewed the bids received and found that the lowest bidder, Concept Consultant, Inc., submitted an invalid bid value, deeming this bidder nonresponsive. Concept Consultant, Inc. contested this determination and provided a Bid Protest Letter, dated February 6, 2025. Staff reviewed the Bid Protest Letter and determined that the bid irregularity was material and could not be waived, as it created an unfair competitive advantage. Even if it could be waived, the City is not required to do so as such waivers are discretionary.
In accordance with Public Contract Code 5100 et seq., staff rejected the protest and confirmed that the bid was non-responsive. A formal letter was issued to Concept Consultant, Inc. on February 12, 2025 outlining the reasons for rejection. Concept Consultant, Inc. responded by letter on February 17, 2025 further protesting and appealing staff’s determination, but not in the manner required by the bid documents for an appeal to the City Council. The City Council remains free to entertain Concept Consultant, Inc.’s protest and the basis thereof if it wishes to do so, although staff
City of Hermosa Beach | Page 4 of 7
observes that it was, is, and remains to appear to lack legal or factual merit for the reasons articulated in the accompanying correspondence.
The second lowest bidder, ARIX, Inc., did not include an adequate number of references or years of experience, deeming the bidder non-responsible. ARIX, Inc. did not contest this determination. Therefore, the two lowest bidders were found to be non-responsive and non-responsible, and their bids were disqualified.
The third lowest bidder, KYA Services LLC., was found to be the lowest responsible and responsive bidder with a bid in the amount of $797,766 (Attachment 6). Staff confirmed KYA Services LLC.’s contractor license is active and in good standing with the Contractor’s State License Board. Staff contacted KYA Services references and confirmed their competency through completion of recent projects of similar scope of work within the past five years. Past clients include the City of Seal Beach, Palos Verdes Unified School District, Azusa Unified School District, and Taft Union High School. All reviewed projects were completed on time and within budget. Overall, staff finds KYA Services, LLC to be a qualified contractor to complete the proposed work for the subject project and recommends City Council award the construction contract to KYA Services, LLC (Attachment 1).
If awarded, staff would provide construction management with additional inspection services provided by one of the City’s on-call civil engineering firms during construction.
Staff anticipates construction to start as soon as April 2025, with an anticipated completion date in June 2025. Additionally, as the current hours and use polices for the Kelly pickleball courts were formed during the temporary closure of two of the four pickleball courts, staff would form a stakeholder group consisting of representatives from the local neighborhood and members of the pickleball community to consider necessary use policy updates to accompany four pickleball courts to recommend to the Commission and Council.
ADA Self-Evaluation and Transition Plan Consistency
The project is consistent with the goals of the adopted 2022 Americans with Disabilities Act (ADA) Self-Evaluation and Transition Plan as it advances the construction of improvements that remove physical barriers and facilitate access for all individuals.
Environmental Analysis
The Project is exempt under CEQA pursuant to CEQA Guidelines Section 15301 (Existing Facilities). The proposed work is a minor alteration of existing public structures or facilities involving negligible or no expansion of existing use. Further the Project is exempt pursuant to CEQA Guidelines Section 15302 (Replacement and Reconstruction) as the proposed work consists of reconstruction of existing court structures where the new courts will be located on the same site as the structure replaced and will have substantially
City of Hermosa Beach | Page 5 of 7
the same purpose and capacity as the structure replaced. No exceptions to the CEQA exemption apply.
General Plan Consistency:
PLAN Hermosa, the City’s General Plan, was adopted by the City Council in August 2017.
The Kelly Courts Improvement Project supports several PLAN Hermosa goals and policies that are listed below.
Parks + Open Space Element
Goal 1. First Class, well maintained, and safe recreational facilities, parks, and open spaces.
Policies:
1.1 Facility upgrades. Improve and update park and open space facilities on a regular basis.
1.2: Lighting and visibility. Provide appropriate lighting and visibility within park facilities while avoiding adverse impacts to adjacent properties. 1.4 Low Maintenance Design. Promote environmentally sustainable and low maintenance design principles in the renovation, addition, or maintenance of parks and recreation facilities.
Goal 2. Abundant parks, open space, and recreational facilities to serve the community.
Policy:
2.6 Investment and maintenance. Prioritize the investment and maintenance of existing facilities prior to development and expansion of new facilities.
Goal 3. Community parks and facilities encourage social activity and interaction.
Policy:
3.2 Social and cultural events. Design and program parks and open space to accommodate unique social and cultural events to foster connectedness and interaction.
Goal 4. Direct and accessible routes and connections to parks, recreational facilities, and open space are provided.
Policies:
4.2 Enhanced access points. Increase and enhance access to parks and open space, particularly across major thoroughfares, as well as access points that promote physical activity such as pedestrian- and bike-oriented access points. 4.4 ADA accessible park access. Install ADA and universally accessible amenities and equipment so that all parks, beach, and trail networks are accessible to all persons.
Goal 5. Scenic vistas, viewpoints, and resources are maintained or enhanced.
City of Hermosa Beach | Page 6 of 7
Policy:
5.5 Landscape design. Consider public access to public views and vistas and encourage landscape design that protects or enhances those views Infrastructure Element
Goal 1. Infrastructure systems are functional, safe, and well maintained.
Policy:
1.8 Minimize recurring repairs. Ensure that recurring repairs to City facilities are minimized by investing in low maintenance materials and performing preventive procedures where available.
Fiscal Impact:
CIP 619–Kelly Court Improvements is budgeted in the FY 2024–25 Adopted Budget and funded at the Tyco Fund (122), Park/Rec Facility Tax Fund (125), and the Capital Improvement Fund (301) with a combined budget of $1,223,103. The lowest responsible and responsive bidder, KYA Services, LLC., submitted its bid at $797,766. Staff recommends establishing a contingency of $160,000 to cover any unforeseen conditions or additional work required during construction for a total construction contract budget not to exceed $957,766.
Sufficient funds are available in the Tyco Fund, Park/Rec Facility Tax Fund and the Capital Improvement Fund to cover construction costs for CIP–619 Kelly Courts Renovations.
The funds would cover the full construction, as well as construction management and inspection services for the project. Any unused funds would be returned to the Capital Improvement Fund.
Agreement Request
Contract Request Amount FY 2024-25 Budget
Dept. Account #
Total Contract
Amount
KYA Services, LLC. $797,766
122-8619-4201
125-8619-4201
301-8619-4201
$250,000
$310,000
$237,766
20 Percent Project
Contingency $160,000 301-8619-4201 $160,000
Total $957,766 $957,766
Attachments:
1. Draft Construction Agreement
2. Draft Resolution
3. Bid Opening Log
4. Bid Documents for Concept Consultants, Inc. (1st Lowest Bidder)
5. Bid Documents for ANIX, Inc. (2nd Lowest Bidder)
City of Hermosa Beach | Page 7 of 7
6. Bid Documents for KYA Services LLC. (Lowest Responsible and Responsive Bidder)
7. CIP 619 Project Plans
8. CIP 619 Project Specifications
9. Bid Protest
10.Bid Protest Staff Response
11.Bid Protest Response Reply
Respectfully Submitted by: Laney Wilson, Associate Engineer Concur: Saad Malim, Senior Engineer
Concur: John Oskoui, Acting City Engineer
Concur: Lisa Nichols, Community Resources Director
Concur: Joe SanClemente, Public Works Director
Noted for Fiscal Impact: Brandon Walker, Administrative Services Director Legal Review: Patrick Donegan, City Attorney
Reviewed by: Angela Crespi, Deputy City Manager
Approved: Suja Lowenthal, City Manager
1 CONTRACT AGREEMENT
This Construction Agreement (“Agreement”) is made and entered into as of the date executed by the Mayor and attested to by the City Clerk, by and between KYA Services, LLC. (hereinafter referred to as "CONTRACTOR") and the City of Hermosa Beach, California, a municipal corporation (hereinafter referred to as "CITY").
R E C I T A L S
A. Pursuant to the Notice Inviting Sealed Bids for CIP 619 KELLY COURT RENOVATIONS (“Project”), bids were received, publicly opened, and declared on the date specified in the notice; and
B. On February 25, 2025, City’s City Council declared CONTRACTOR to be the lowest responsible bidder and accepted the bid of CONTRACTOR; and C. The City Council has authorized the Mayor to execute a written contract with CONTRACTOR for furnishing labor, equipment and material for CIP 689 Clark Building Renovations in the City of Hermosa Beach.
NOW, THEREFORE, in consideration of the foregoing and the mutual covenants herein contained, it is agreed:
1. GENERAL SCOPE OF WORK: CITY agrees to engage CONTRACTOR and CONTRACTOR agrees to furnish all necessary labor, tools, materials, appliances, and equipment for and do the work for the CIP 619 KELLY COURT RENOVATIONS in the City of Hermosa Beach. The work shall be performed in accordance with the Plans and Specifications dated during the month of January 2025 (the “Specifications”) on file in the office of the City Clerk and in accordance with bid prices set forth in CONTRACTOR’S Bid Proposal and in accordance with the instructions of the City Engineer.
2. INCORPORATED DOCUMENTS TO BE CONSIDERED COMPLEMENTARY: The contract documents for the aforesaid project shall consist of the Notice Inviting Bids, Instructions to Bidders, Bid Proposal, Builders General Provisions, Standard Specifications 2021 edition, Special Provisions, Exhibit A to Exhibit C, and all referenced specifications, details, standard drawings, and appendices; together with this Agreement and all required bonds, insurance certificates, permits, notices and affidavits; and also, including any and all addenda or supplemental agreements clarifying, amending, or extending the work contemplated as may be required to insure its completion in an acceptable manner. All of the provisions of said contract documents are made a part hereof as though fully set forth herein. This contract is intended to require a complete and finished piece of work and anything necessary to complete the work properly and in accordance with the law and lawful governmental regulations shall be performed by CONTRACTOR whether set out specifically in the contract or not. Should it be ascertained that any
2 inconsistency exists between the aforesaid documents and this written agreement, the provisions of this Agreement, the Builders General Provisions and the Standard Specifications, in that order, shall control. Collectively, these contract documents constitute the complete agreement between CITY and CONTRACTOR and supersede any previous agreements or understandings.
3. COMPENSATION: CONTRACTOR agrees to receive and accept the prices set forth in its Bid Proposal $797,766.00, as full compensation for furnishing all materials, performing all work, and fulfilling all obligations hereunder. Said compensation shall cover all expenses, losses, damages, and consequences arising out of the nature of the work during its progress or prior to its acceptance including those for well and faithfully completing the work and the whole thereof in the manner and time specified in the aforesaid contract documents; and also including those arising from actions of the elements, unforeseen difficulties or obstructions encountered in the prosecution of the work, suspension or discontinuance of the work, and all other unknowns or risks of any description connected with the work.
4. TIME OF PERFORMANCE: CONTRACTOR agrees to complete the work within 25 working days from the date of the notice to proceed. By signing this Agreement, CONTRACTOR represents to CITY that the contract time is reasonable for completion of the work and that CONTRACTOR will complete such work within the contract time.
5. LIQUIDATED DAMAGES: In accordance with Government Code section 53069.85, it is agreed that CONTRACTOR will pay to CITY the sum set forth in Part 1 General Provisions Section 6-9 for each and every calendar day of delay beyond the time prescribed in the Contract Documents for finishing the Work, as Liquidated Damages and not as a penalty or forfeiture. In the event this is not paid, CONTRACTOR agrees CITY may deduct that amount from any money due or that may become due CONTRACTOR under the Contract.
This Article does not exclude recovery of other damages specified in the Contract Documents.
6. SUBSTITUTION OF SECURITIES: Pursuant to section 22300 of the Public Contract Code of the State of California, CONTRACTOR may request CITY to make retention payments directly to an escrow agent or may substitute securities for any money withheld by CITY to ensure performance under the contract. At the request and expense of CONTRACTOR, securities equivalent to the amount withheld shall be deposited with CITY or with a state or federally chartered bank as the escrow agent who shall return such securities to CONTRACTOR upon satisfactory completion of the contract. Deposit of securities with an escrow agent shall be subject to a written agreement substantially in the form provided in section 22300 of the Public Contract Code.
7. PREVAILING WAGES AND CALIFORNIA LABOR LAWS.
Pursuant to Labor Code §§ 1720 et seq., and as specified in 8 California Code of Regulations § 16000 (“Prevailing Wage Laws”), CONTRACTOR must pay its workers prevailing wages. It is CONTRACTOR’s responsibility to interpret and implement any prevailing wage requirements, and CONTRACTOR agrees to pay any penalty or civil
3 damages resulting from a violation of the prevailing wage laws. CONTRACTOR shall defend, indemnify and hold the CITY, its officials, officers, employees and agents free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws. CONTRACTOR and any subcontractor shall forfeit a penalty of up to $200 per calendar day or portion thereof for each worker paid less than the prevailing wage rates.
In accordance with Labor Code § 1773.2, copies of the prevailing rate of per diem wages are available upon request from CITY’s Engineering Division or the website for State of California Prevailing wage determination at http://www.dir.ca.gov/DLSR/PWD.
CONTRACTOR must post a copy of the prevailing rate of per diem wages at the job site.
CITY directs CONTRACTOR’s attention to Labor Code §§ 1777.5, 1777.6 and 3098 concerning the employment of apprentices by CONTRACTOR or any subcontractor.
Labor Code § 1777.5 requires CONTRACTOR or subcontractor employing tradesmen in any apprenticeship occupation to apply to the joint apprenticeship committee nearest the site of the public works project and which administers the apprenticeship program in that trade for a certificate of approval. The certificate must also fix the ratio of apprentices to journeymen that will be used in the performance of the contract. The ratio of apprentices to journeymen in such cases will not be less than one to five except:
When employment in the area of coverage by the joint apprenticeship committee has exceeded an average of 15 percent in the 90 days before the request for certificate, or When the number of apprentices in training in the area exceeds a ratio of one to five, or When the trade can show that it is replacing at least 1/30 of its membership through apprenticeship training on an annual basis state-wide or locally, or Assignment of an apprentice to any work performed under a public works contract would create a condition that would jeopardize his or her life or the life, safety, or property of fellow employees or the public at large, or the specific task to which the apprentice is to be assigned is of a nature that training cannot be provided by a journeyman.
When CONTRACTOR provides evidence that CONTRACTOR employs registered apprentices on all of his contracts on an annual average of not less than one apprentice to eight journeymen.
CONTRACTOR is required to make contributions to funds established for the administration of apprenticeship programs if CONTRACTOR employs registered apprentices or journeymen in any apprenticeable trade on such contracts and if other contractors on the public works site are making such contributions.
CONTRACTOR and any subcontractor must comply with Labor Code §§ 1777.5 and 1777.6 in the employment of apprentices.
4 Information relative to apprenticeship standards, wage schedules and other requirements may be obtained from the Director of Industrial Relations, ex-officio the Administrator of Apprenticeship, San Francisco, California, or from the Division of Apprenticeship Standards and its branch offices.
The CONTRACTOR or any subcontractor that is determined by the Labor Commissioner to have knowingly violated Section 1777.5 shall forfeit as a civil penalty an amount not exceeding $100 for each full calendar day of noncompliance, or such greater amount as provided by law.
CONTRACTOR and each subcontractor shall keep an accurate payroll record, showing the name, address, social security number, work classification, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed by him or her in connection with the public work. The payroll records shall be certified and shall be available for inspection at all reasonable hours at the principal office of CONTRACTOR in the manner provided in Labor Code section 1776. In the event of noncompliance with the requirements of this section, CONTRACTOR shall have 10 days in which to comply subsequent to receipt of written notice specifying in what respects such CONTRACTOR must comply with this section. Should noncompliance still be evident after such 10-day period, CONTRACTOR shall, as a penalty to CITY, forfeit not more than $100.00 for each calendar day or portion thereof, for each worker, until strict compliance is effectuated. The amount of the forfeiture is to be determined by the Labor Commissioner. A contractor who is found to have violated the provisions of law regarding wages on Public Works with the intent to defraud shall be ineligible to bid on Public Works contracts for a period of one to three years as determined by the Labor Commissioner. Upon the request of the Division of Apprenticeship Standards or the Division of Labor Standards Enforcement, such penalties shall be withheld from progress payments then due. The responsibility for compliance with this section is on CONTRACTOR. The requirement to submit certified payroll records directly to the Labor Commissioner under Labor Code section 1771.4 shall not apply to work performed on a public works project that is exempt pursuant to the small project exemption specified in Labor Code Section 1771.4.
Any ineligible contractor or subcontractor pursuant to Labor Code Sections 1777.1 and 1777.7 may not perform work on this Project.
By executing this Contract, CONTRACTOR verifies that it fully complies with all requirements and restrictions of state and federal law respecting the employment of undocumented aliens, including, but not limited to, the Immigration Reform and Control Act of 1986, as may be amended from time to time, and shall require all subcontractors and sub-subcontractors to comply with the same.
8. LEGAL HOURS OF WORK: Eight (8) hours of labor shall constitute a legal day's work for all workmen employed in the execution of this contract, and CONTRACTOR and any subcontractor under it shall comply with and be governed by the laws of the State of
5 California having to do with working hours set forth in Division 2, Part 7, Chapter 1, Article 3 of the Labor Code of the State of California as amended.
CONTRACTOR shall forfeit, as a penalty to City, twenty-five dollars ($25.00) for each laborer, workman or mechanic employed in the execution of the contract, by him or any subcontractor under it, upon any of the work hereinbefore mentioned, for each calendar day during which the laborer, worker or mechanic is required or permitted to labor more than eight (8) hours in any one calendar day or 40 hours in any one calendar week in violation of the Labor Code.
9. PUBLIC WORKS CONTRACTOR REGISTRATION: Pursuant to Labor Code sections 1725.5 and 1771.1, all contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be registered with the Department of Industrial Relations (DIR). No bid will be accepted nor any contract entered into without proof of the contractor’s and subcontractors’ current registration with the DIR to perform public work. Notwithstanding the foregoing, the contractor registration requirements mandated by Labor Code Sections 1725.5 and 1771.1 shall not apply to work performed on a public works project that is exempt pursuant to the small project exemption specified in Labor Code Sections 1725.5 and 1771.1.
10. LABOR COMPLIANCE AND STOP ORDERS: This Project is subject to compliance monitoring and enforcement by the DIR. It shall be CONTRACTOR’s sole responsibility to evaluate and pay the cost of complying with all labor compliance requirements under this Contract and applicable law. Any stop orders issued by the DIR against CONTRACTOR or any subcontractor that affect CONTRACTOR’s performance of Work, including any delay, shall be CONTRACTOR’s sole responsibility. Any delay arising out of or resulting from such stop orders shall be considered CONTRACTOR caused delay subject to any applicable liquidated damages and shall not be compensable by the CITY.
CONTRACTOR shall defend, indemnify and hold CITY, its officials, officers, employees and agents free and harmless from any claim or liability arising out of stop orders issued by the DIR against CONTRACTOR or any subcontractor.
11. DEBARMENT OF CONTRACTORS AND SUBCONTRACTORS: Contractors or subcontractors may not perform work on a public works project with a subcontractor who is ineligible to perform work on a public project pursuant to Labor Code section 1777.1 or 1777.7. Any contract on a public works project entered into between a contractor and a debarred subcontractor is void as a matter of law. A debarred subcontractor may not receive any public money for performing work as a subcontractor on a public works contract. Any public money that is paid, or may have been paid to a debarred subcontractor by a contractor on the Project shall be returned to the CITY. CONTRACTOR shall be responsible for the payment of wages to workers of a debarred subcontractor who has been allowed to work on the project.
12. LABOR/EMPLOYMENT SAFETY: CONTRACTOR shall comply with all applicable laws and regulations of the federal, state, and local government, including Cal/OSHA
6 requirements and requirements for verification of employees’ legal right to work in the United States
CONTRACTOR shall maintain emergency first aid treatment for its employees which complies with the Federal Occupational Safety and Health Act of 1970 (29 U.S.C. § 651 et seq.), and California Code of Regulations, Title 8, Industrial Relations Division 1, Department of Industrial Relations, Chapter 4. CONTRACTOR shall ensure the availability of emergency medical services for its employees in accordance with California Code of Regulations, Title 8, Section 1512.
CONTRACTOR shall submit the Illness and Injury Prevention Program and a Project site specific safety program to CITY prior to beginning Work at the Project site.
CONTRACTOR shall maintain a confined space program that meets or exceeds the CITY Standards. CONTRACTOR shall adhere to CITY’s lock out tag out program
13. TRAVEL AND SUBSISTENCE PAY: CONTRACTOR agrees to pay travel and subsistence pay to each worker needed to execute the work required by this Agreement as such travel and subsistence payments are defined in the applicable collective bargaining agreements filed in accordance with Labor Code Section 1773.8.
14. CONTRACTOR'S LIABILITY: The City of Hermosa Beach and its officers, agents and employees ("Indemnitees") shall not be answerable or accountable in any manner for any loss or damage that may happen to the work or any part thereof, or for any of the materials or other things used or employed in performing the work; or for injury or damage to any person or persons, either workers or employees of CONTRACTOR, of its subcontractors or the public, or for damage to adjoining or other property from any cause whatsoever arising out of or in connection with the performance of the work. CONTRACTOR shall be responsible for any damage or injury to any person or property resulting from defects or obstructions or from any cause whatsoever.
To the fullest extent permitted by law, CONTRACTOR will indemnify Indemnities against and will hold and save Indemnitees harmless from any and all actions, claims, damages to persons or property, penalties, obligations or liabilities that may be asserted or claimed by any person, firm, entity, corporation, political subdivision, or other organization arising out of or in connection with the work, operation, or activities of CONTRACTOR, its agents, employees, subcontractors or invitees provided for herein, whether or not there is concurrent passive negligence on the part of City. In connection therewith:
a. CONTRACTOR will defend any action or actions filed in connection with any such claims, damages, penalties, obligations or liabilities and will pay all costs and expenses, including attorneys' fees, expert fees and costs incurred in connection therewith.
b. CONTRACTOR will promptly pay any judgment rendered against CONTRACTOR or Indemnitees covering such claims, damages, penalties, obligations and liabilities arising out of or in connection with such work,