65270.00001\44513177.1
AAU Hermosa Beach Championships 2026 – 2028 6
certificates of insurance to City, which certificates shall clearly evidence all coverage required above and provide that such insurance shall not be materially changed, terminated or allowed to expire except on thirty (30) days prior written notice to City; and further, shall provide that if AAU fails to pay any required deductible or self-insured retention, City may do so at AAU’s expense. l. Indemnification. AAU shall indemnify and hold harmless the CITY, its officers, employees and agents from and against any and all claims, demands, losses, damages, costs and expenses (including but not limited to court costs, penalties, expert fees and reasonable attorneys’ fees), judgments, liabilities and causes of action of any nature whatsoever and damages for injuries to persons and property arising from AAU‘s use of City Property pursuant to this Agreement, including but not limited to AAU‘s negligent or wrongful acts, errors or omissions in the set-up, operation and tear-down of its improvements and use of City Property by AAU’s guests, patrons, invitees, customers, employees, officers, and contractors hired in connection with this Agreement. AAU shall promptly pay the amount of any final and non-appealable judgment rendered against CITY, its officers, employees and agents for any such indemnified claims, and reasonable costs, and reasonable expert and attorney fees incurred by CITY in the defense of such claims.
AAU’s obligations under this Section shall survive any termination of this Agreement.
Section 3. CITY’s Duties.
a. Event Permits. CITY shall provide event permits to AAU for each Event unless CITY determines in its sole discretion that it would not be in the public interest or that it would be averse to the public health, safety, or welfare.
Section 4. Assignment. This Agreement may not be assigned in whole or in part by either party, without the prior written consent of the other party. This Agreement is binding upon, and will inure to the benefit of, the successors and permitted assigns of each party.
Section 5. Independent Contractor. AAU will act hereunder as an independent contractor. This Agreement shall not and is not intended to constitute AAU as an agent, servant, or employee of the other party and shall not and is not intended to create the relationship of partnership, joint venture or association between CITY and AAU.
65270.00001\44513177.1
AAU Hermosa Beach Championships 2026 – 2028 7
Section 6. Termination. CITY may terminate this Agreement upon thirty (30) days written notice to AAU if CITY determines in its sole discretion that continuation of this Agreement would not be in the public interest, that it would be adverse to the public health, safety, or welfare, or that a substantial portion of CITY’s property is unavailable due to construction activity. Prior to termination on the ground that a substantial portion of CITY’s property is unavailable due to construction activity, CITY shall provide AAU an opportunity to propose adjustments to the venue or an alternative location for the Events. AAU’s proposed adjustments or alternative shall be provided within thirty (30) days of written notice from CITY and is subject to approval of the City Council, in its sole discretion, in a public meeting.
AAU may terminate this Agreement upon written notice if any casualty or other cause beyond the reasonable control of AAU prohibits or materially impedes AAU from conducting any Events in the manner required by the CITY. Upon termination of the Agreement, any Events subsequent to the termination will no longer be the responsibility of AAU.
Section 7. Notice. Any notice, demand, request, approval or communication required be made or given pursuant to this Agreement may either be personally served upon the other Party or deposited in the United States mail, postage prepaid as follows:
For AAU: Amateur Athletic Union
7428 Midfield Avenue
Los Angeles, CA 90045
(310 )877-5392
Attention: Denny Lennon
For CITY: City of Hermosa Beach
1315 Valley Drive
Hermosa Beach, California 90254
(310) 318-0216
Attention: Steve Napolitano
Any notices so given pursuant to the provision of this paragraph will be deemed served twenty-four (24) hours after the deposit thereof in the United States mail.
Section 8. Entire Agreement. This Agreement represents the entire integrated agreement between CITY and AAU, and supersedes all prior negotiations, representations or agreements, either written or oral, with respect to the subject matter of this Agreement. This Agreement may be amended only by a written instrument signed by both parties. The parties anticipate that, in addition to this Agreement, they will enter into a mutually acceptable event agreement for
65270.00001\44513177.1
AAU Hermosa Beach Championships 2026 – 2028 8
each Event setting forth precise terms and conditions applicable to that Event.
This Agreement may be executed in counterparts, each of which is deemed an original, but all of which together are deemed to be one and the same agreement. A signed copy of this Agreement delivered by email or other means of electronic transmission is deemed to have the same legal effect as delivery of an original signed copy of this Agreement.
Section 9. Representations and Warranties. Each party hereby represents and warrants to the other party as of the date of this Agreement as follows:
a. It has the full power and authority to enter into this Agreement and perform each of its obligations hereunder;
b. This Agreement constitutes a legal, valid, and binding obligation of such party, enforceable against it in accordance with the terms of this Agreement, subject to creditors’ rights and general principles of equity; c. Such party’s execution and delivery of this Agreement, and its performance hereunder, will not violate or conflict with any other contract or agreement to which it is a party, any applicable law, or any court order or decree to which it is subject;
d. It is legally authorized and has obtained all necessary regulatory approvals for the execution, delivery, and performance of this Agreement;
e. No litigation or pending or threatened (in writing) claims of litigation exist which would reasonably be likely to adversely affect its ability to fully perform its obligations hereunder or the rights granted by it to the other party under this Agreement;
f. Such party’s employees (and employes of its subsidiaries, affiliates, assigns, representatives, licensees, or others contracting with such party to work at any Event) are, to the extent such position is covered by any collective bargaining agreement or to the extent there is any agreement obligating such function to be performed by union members, members of the appropriate union.;
Section 10. Choice of Law. This Agreement shall be deemed to be made, governed by, and construed in accordance with the laws of the State of California without giving effect to the conflict of law principles thereof.
Section 11. Severability. If any provision or a portion of any provision of this Agreement is held to be unenforceable or invalid by a court of competent
65270.00001\44513177.1
AAU Hermosa Beach Championships 2026 – 2028 9
jurisdiction, the validity and enforceability of the enforceable portion of any such provision and/or the remaining provisions shall not be affected thereby.
Section 12. Waiver. The failure of any Party to enforce any of the provisions of this Agreement, or any rights with respect hereto, or the failure to exercise any election provided for herein, will in no way be considered a waiver of such provisions, rights, or elections, or in any way affect the validity of this Agreement.
The failure of any Party to enforce any of such provisions, rights, or elections will not prejudice such Party from later enforcing or exercising the same or any other provisions, rights, or elections which it may have under this Agreement.
EXECUTED the day and year first above stated.
AMATEUR ATHLETIC UNION
By: ____________________________________
Denny Lennon, AAU Beach Volleyball Director
CITY OF HERMOSA BEACH
By:___________________________________
Rob Saemann, Mayor
APPROVED AS TO FORM ATTEST
By:_________________________________ By:_________________________________ Jason Baltimore, Interim City Attorney Myra Maravilla, City Clerk
65270.00001\44503598.1
AVP 2026 – 2028 1
AGREEMENT BETWEEN THE CITY OF HERMOSA BEACH AND
ASSOCIATION OF VOLLEYBALL PROFESSIONALS, LLC TO
PROVIDE JUNIOR AND ADULT YOUTH VOLLEYBALL
TOURNAMENTS
THIS AGREEMENT is made this 13th day of January, 2026 (hereinafter titled the “Effective Date”), by and between the City of Hermosa Beach, a California municipal corporation (hereinafter called “CITY”) and Association of Volleyball Professionals, LLC, a Delaware limited liability company (hereinafter called “AVP”). CITY and AVP are sometimes individually referred to herein as “Party” and collectively referred to as “Parties.”
RECITALS
A. AVP desires to organize, coordinate, produce, and oversee a junior youth volleyball tournament, titled the AVP Junior National Championships (“Event”) in the City on City-owned property for the term of this Agreement.
B. AVP represents that it is qualified and able to do so in a manner that benefits CITY and its community.
C. The CITY is willing to make its property (“City Property”) available for the Event due to the benefit it provides to the community.
NOW, THEREFORE, the parties agree as follows:
Section 1. Term of Agreement. The term of this Agreement shall commence on the Effective Date and terminate on January 31, 2028, unless earlier terminated as provided herein. Further, the City Manager, in the City Manager’s sole discretion, may have the option to extend this Agreement for one (1) additional one (1) year term on dates to be determined and contingent upon scheduling considerations related to the 2028 Olympic and Paralympic training and/or games.
Section 2. AVP’s Duties:
a. Events, Dates, and Locations. Subject to the terms of this Agreement, AVP may organize, coordinate, produce, conduct, and oversee the Event, which consists of a youth volleyball tournament on the dates below. Event activities may take place on the Beach north and south of the Pier within the commercial zone between 10th to 15th street. The Event must remain open to the
65270.00001\44503598.1
AVP 2026 – 2028 2
public. Event dates, including set-up and tear-down, included as part of this Agreement shall be:
• July 21, 2026 – July 27, 2026; and
• July 19, 2027 – July 27, 2027.
b. Annual Event Confirmation, Changes, and Cancellations. AVP must annually inform the CITY of its intent to produce the Event, including confirmation of event dates and event times, no later than three (3) months prior to the event. The City shall notify AVP of its intention to exercise the additional one (1) year option and for which dates no later than January 31, 2028. Should AVP desire to reschedule an event date(s) or change Event location(s) from the dates outlined in this Agreement, it must do so in writing no later than three (3) months prior to the Event. CITY will review the request against other activities and events booked within the City. While approval of a date change will not be unreasonably withheld, already scheduled activities or events will have priority. Use of additional location(s) may be approved as mutually agreed upon between the CITY and AVP provided AVP informs the CITY of this request at least three (3) months prior to the Event.
CITY reserves the right in its sole discretion at any time or times to cancel the Event and/or suspend the use of Event location(s) subject to this Agreement, for any duration to protect public health and safety. Any such closure will not constitute a breach or a default of this Agreement. CITY shall have no liability whatever to AVP for the effect of such suspension and closure on any Event, nor shall CITY have any responsibility to provide AVP with substitute Event dates or locations. AVP’s rights under this Agreement are subject and subordinate to CITY’s police and emergency powers in addition to CITY’s rights to manage its municipal facilities, including outdoor public spaces and its contractual rights as described in this Agreement.
c. Events Permits and Agreements. AVP shall obtain permits from CITY for Event and shall enter into and comply with all agreements for such permits as required by CITY, including but not limited to the following:
• Any required permits from the Community Development
Department pertaining to building and safety review.
• Any required permits from the Los Angeles County Fire Department.
• Any required permits from the California Coastal
Commission.
65270.00001\44503598.1
AVP 2026 – 2028 3
d. Fee to CITY. AVP shall pay CITY direct and indirect costs, including but not limited to the provision of CITY staff time dedicated to the Event, Amplified Sound Permit fees, parking fees, daily special event category fees, daily set-up/tear-down fees, and co-sponsor fees as per the Special Events Policy Guide.
e. Annual Review. Within sixty (60) days prior to and after each Event, AVP shall provide an annual overview to the Parks, Recreation, and Community Resources Advisory Commission in the form of an agendized presentation. The pre-event presentation shall highlight:
a general event overview, including the anticipated number of attendees; an overview of the event footprint and individualized setup; and anticipated impacts to the community as a result of the event. The post-event presentation shall include: a general overview including the actual number of attendees; actual impact(s) to the community as a result of the event; and any event struggle(s) and success(es).
f. Environmental Sustainable Measures. AVP shall implement the CITY’s environmental sustainability measures, including but not limited to:
• AVP shall only use electric generators or generators
operated with a 50% blend of bio-diesel fuel, or
equivalent or lower emissions sources.
• AVP shall incorporate sustainability requirements into vendor agreements.
• AVP shall advertise green measures and rules in event advertising.
• AVP shall limit single-use paper, packaging, and décor items.
• AVP shall limit use of handouts, flyers, and giveaways. • AVP shall enact a no-idling requirement for vehicles. • AVP shall provide on-site personnel to ensure that litter and trash are minimized, and recycling is maximized.
• AVP shall encourage vehicles used in connection with
the event, are hybrid, electric, or CNG vehicles.
• AVP shall participate in pre-event and post-event
reviews of compliance with sustainability measures.
g. Parking Spaces. AVP may request dedicated use of public parking spaces as needed for Event activities including parking of Eventrelated vehicles; storage of essential Event-related equipment and
65270.00001\44503598.1
AVP 2026 – 2028 4
supplies; and other Event-related structures for each Event. Use of these spaces must be mutually agreed upon between the CITY and AVP following submittal of a site plan by AVP outlining the use of the parking space(s) at least ten (10) working days prior to each Event.
While approval of parking request(s) will not be unreasonably withheld, already scheduled activities or events will have priority.
The CITY will consider approval based on the location, seasonal needs for parking, and the overall impacts to the loss of parking spaces to the area. AVP shall ensure the spaces are clean from debris, and other materials that were collected as a result of Event activities.
h. Logistical Meetings. AVP is required to participate in logistical and planning meetings with relevant CITY departments as reasonably requested by the City, subject to AVP’s reasonable availability. i. Restroom, Recycling, and Trash Facilities. AVP shall provide an acceptable number of portable toilet facilities for each Event as determined by the CITY. AVP shall provide trash and recycling receptacles for each Event as required by the CITY. Recyclable items shall be separated from refuse/trash. AVP shall coordinate with CITY’s franchisee refuser hauler to add recycling containers in convenient locations to ensure capacity and reduce litter. The location, delivery, and pick-up of these items must be mutually agreed upon between AVP and the CITY prior to each Event. j. Sponsorships; Tickets; Merchandise; and Broadcasting. CITY acknowledges and agrees that AVP (i) may (and has the exclusive right to) promote and market the Events in its sole discretion, (ii) may (and has the exclusive right to) sell sponsorships, food and nonalcoholic beverages at Event in its sole discretion; provided that no Events sponsor will be promoting or marketing gambling, political, or religious viewpoints. Donating persons or entities must be consistent with the core values, mission, and vision of the City. CITY hereby grants to AVP and each Event sponsor, at no charge to AVP or such Event sponsor, the right to use and display the City of Hermosa Beach name in advertisements, publicity, and promotions for Events. AVP has the exclusive right to broadcast the Events in its sole discretion and AVP is entitled to retain all revenues from such sales and broadcasts.
k. Insurance. AVP shall provide comprehensive general liability insurance in the form of a certificate naming "the City of Hermosa Beach, its officers, agents, volunteers, and employees as additional
65270.00001\44503598.1
AVP 2026 – 2028 5
insureds." AVP shall maintain insurance coverage meeting the standards outlined in this Section at all times during the term of the Events permitted by this Agreement. All certificates are subject to approval of the City’s Risk Manager. Coverage shall be at least as broad as Insurance Services Form CG 00 01 covering commercial general liability on an "occurrence" basis, including property damage, bodily injury, death, and personal and advertising injury with limits no less than $2,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this Agreement, or the general aggregate limit shall be twice the required occurrence limit. The City reserves the right to request greater or lesser amounts of insurance coverage.
AVP shall provide evidence that the commercial general liability insurance includes coverage for injuries to athletic participants and participant accident insurance. If AVP maintains broader coverage and/or higher limits than the minimums shown above, the City requires and shall be entitled to the broader coverage and/or the higher limits maintained. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City. AVP shall furnish properly executed certificates of insurance to City, which certificates shall clearly evidence all coverage required above and provide that such insurance shall not be materially changed, terminated or allowed to expire except on thirty (30) days prior written notice to City; and further, shall provide that if AVP fails to pay any required deductible or self-insured retention, City may do so at AVP’s expense. l. Indemnification. AVP shall indemnify and hold harmless the CITY, its officers, employees and agents from and against any and all claims, demands, losses, damages, costs and expenses (including but not limited to court costs, penalties, expert fees and reasonable attorneys’ fees), judgments, liabilities and causes of action of any nature whatsoever and damages for injuries to persons and property arising from AVP‘s use of City Property pursuant to this Agreement, including but not limited to AVP‘s negligent or wrongful acts, errors or omissions in the set-up, operation and tear-down of its improvements and use of City Property by AVP’s guests, patrons, invitees, customers, employees, officers, and contractors hired in connection with this Agreement. AVP shall promptly pay the amount of any final and non-appealable judgment rendered against CITY, its officers, employees and agents for any such indemnified claims, and reasonable costs, and reasonable expert and attorney fees incurred by CITY in the defense of such claims.
65270.00001\44503598.1
AVP 2026 – 2028 6
AVP’s obligations under this Section shall survive any termination of this Agreement.
Section 3. CITY’s Duties.
a. Event Permits. CITY shall provide event permits to AVP for each Event unless CITY determines in its sole discretion that it would not be in the public interest or that it would be averse to the public health, safety, or welfare.
Section 4. Assignment. This Agreement may not be assigned in whole or in part by either party, without the prior written consent of the other party. This Agreement is binding upon, and will inure to the benefit of, the successors and permitted assigns of each party.
Section 5. Independent Contractor. AVP will act hereunder as an independent contractor. This Agreement shall not and is not intended to constitute either party as an agent, servant, or employee of the other party and shall not and is not intended to create the relationship of partnership, joint venture or association between CITY and AVP.
Section 6. Termination. CITY may terminate this Agreement upon thirty (30) days written notice to AVP if CITY determines in its sole discretion that continuation of this Agreement would not be in the public interest, that it would be adverse to the public health, safety, or welfare, or that a substantial portion of CITY’s property is unavailable due to construction activity. Prior to termination on the ground that a substantial portion of CITY’s property is unavailable due to construction activity, CITY shall provide AVP an opportunity to propose adjustments to the venue or an alternative location for the event. AVP’s proposed adjustments or alternative shall be provided within thirty (30) days of written notice from CITY and is subject to approval of the City Council, in its sole discretion, in a public meeting. AVP may terminate this Agreement upon written notice if any casualty or other cause beyond the reasonable control of AVP prohibits or materially impedes AVP from conducting any Event in the manner required by the CITY. Upon termination of the Agreement, any events subsequent to the termination will no longer be the responsibility of AVP.
Section 7. Notice. Any notice, demand, request, approval or communication required to be made or given pursuant to this Agreement may either be personally served upon the other Party or deposited in the United States mail, postage prepaid as follows:
For AVP: Association of Volleyball Professionals, LLC
1688 Meridian Ave, Suite 700
65270.00001\44503598.1
AVP 2026 – 2028 7
Miami Beach, FL 33139
Attn: Robert Corvino, Chief Operating Officer
For CITY: City of Hermosa Beach
1315 Valley Drive
Hermosa Beach, California 90254
(310) 318-0216
Attention: Steve Napolitano
Any notices so given pursuant to the provision of this paragraph will be deemed served twenty-four (24) hours after the deposit thereof in the United States mail.
Section 8. Entire Agreement. This Agreement represents the entire integrated agreement between CITY and AVP, and supersedes all prior negotiations, representations or agreements, either written or oral, with respect to the subject matter of this Agreement. This Agreement may be amended only by a written instrument signed by both parties. The parties anticipate that, in addition to this Agreement, they will enter into a mutually acceptable event agreement for each Event setting forth precise terms and conditions applicable to that Event.
This Agreement may be executed in counterparts, each of which is deemed an original, but all of which together are deemed to be one and the same agreement. A signed copy of this Agreement delivered by email or other means of electronic transmission is deemed to have the same legal effect as delivery of an original signed copy of this Agreement.
Section 9. Representations and Warranties. Each party hereby represents and warrants to the other party as of the date of this Agreement as follows:
a. It has the full power and authority to enter into this Agreement and perform each of its obligations hereunder;
b. This Agreement constitutes a legal, valid, and binding obligation of such party, enforceable against it in accordance with the terms of this Agreement, subject to creditors’ rights and general principles of equity; c. Such party’s execution and delivery of this Agreement, and its performance hereunder, will not violate or conflict with any other contract or agreement to which it is a party, any applicable law, or any court order or decree to which it is subject;
d. It is legally authorized and has obtained all necessary regulatory approvals for the execution, delivery, and performance of this Agreement;
65270.00001\44503598.1
AVP 2026 – 2028 8
e. No litigation or pending or threatened (in writing) claims of litigation exist which would reasonably be likely to adversely affect its ability to fully perform its obligations hereunder or the rights granted by it to the other party under this Agreement;
f. Such party’s employees (and employes of its subsidiaries, affiliates, assigns, representatives, licensees, or others contracting with such party to work at any Event) are, to the extent such position is covered by any collective bargaining agreement or to the extent there is any agreement obligating such function to be performed by union members, members of the appropriate union.
Section 10. Choice of Law. This Agreement shall be deemed to be made, governed by, and construed in accordance with the laws of the State of California without giving effect to the conflict of law principles thereof.
Section 11. Severability. If any provision or a portion of any provision of this Agreement is held to be unenforceable or invalid by a court of competent jurisdiction, the validity and enforceability of the enforceable portion of any such provision and/or the remaining provisions shall not be affected thereby.
Section 12. Waiver. The failure of any Party to enforce any of the provisions of this Agreement, or any rights with respect hereto, or the failure to exercise any election provided for herein, will in no way be considered a waiver of such provisions, rights, or elections, or in any way affect the validity of this Agreement.
The failure of any Party to enforce any of such provisions, rights, or elections will not prejudice such Party from later enforcing or exercising the same or any other provisions, rights, or elections which it may have under this Agreement.
EXECUTED as of the Effective Date.
Association of Volleyball Professionals, LLC
By: ____________________________________
Robert Corvino, Chief Operating Officer
CITY OF HERMOSA BEACH
By:___________________________________
Rob Saemann, Mayor
65270.00001\44503598.1
AVP 2026 – 2028 9
APPROVED AS TO FORM ATTEST
By:_________________________________ By:_________________________________ Jason Baltimore, Interim City Attorney Myra Maravilla, City Clerk
65270.00001\44506815.1
JVA/BVCA Hermosa Beach National Championships 2026 - 2028 1
AGREEMENT BETWEEN THE CITY OF HERMOSA BEACH AND
JUNIOR VOLLEYBALL ASSOCIATION IN PARTNERSHIP WITH
BEACH VOLLEYBALL CLUBS OF AMERICA TO PROVIDE THE
JVA/BVCA HERMOSA BEACH NATIONAL CHAMPIONSHIPS
THIS AGREEMENT is made this 13th day of January, 2026 (hereinafter titled the “Effective Date”), by and between the City of Hermosa Beach, a California municipal corporation (hereinafter called “CITY”) and Junior Volleyball Association (hereinafter called “JVA”), and Beach Volleyball Clubs of America (hereinafter called “BVCA”). CITY, JVA and BVCA are sometimes individually referred to herein as “Party” and collectively referred to as “Parties.”
RECITALS
A. JVA/BVCA desires to organize, coordinate, produce and oversee the JVA/BVCA Hermosa Beach National Championships (“Event”) in the City on City-owned property for the term of this Agreement.
B. JVA/BVCA represents that it is qualified and able to do so in a manner that benefits CITY and its community.
C. The CITY is willing to make its property (“City Property”) available for the Event due to the benefit it provides to the community.
NOW, THEREFORE, the parties agree as follows:
Section 1. Term of Agreement. The term of this Agreement shall commence on the Effective Date and terminate on January 13, 2028, unless earlier terminated as provided herein. Further, the City Manager, in the City Manager’s sole discretion, may have the option to extend this Agreement for one (1) additional one (1) year term on dates to be determined and contingent upon scheduling considerations related to the 2028 Olympic and Paralympic training and/or games.
Section 2. JVA/BVCA’s Duties:
a. Events, Dates, and Locations. Subject to the terms of this Agreement, JVA/BVCA may organize, coordinate, produce and oversee the Event, which consists of a youth volleyball tournament.
Event activities may take place on the Beach north and south of the Pier within the commercial zone between 10th to 15th street. The Event must remain open to the public. Event dates, including set-up and tear-down, included as part of this Agreement shall be:
• July 6, 2026 – July 11, 2026; and
65270.00001\44506815.1
JVA/BVCA Hermosa Beach National Championships 2026 - 2028 2 • July 6, 2027 – July 12, 2027
b. Annual Event Confirmation, Changes, and Cancellations.
JVA/BVCA must annually inform the CITY of its intent to produce the Event, including confirmation of event dates and event times, no later than three months prior to the event. The City shall notify JVA/BVCA of its intention to exercise the additional one (1) year option and for which dates no later than January 31, 2028. Should JVA/BVCA desire to reschedule an event date(s) or change Event location(s) from the dates outlined in this Agreement, it must do so in writing no later than three (3) months prior to the Event. CITY will review the request against other activities and events booked within the City. While approval of a date change will not be unreasonably withheld, already scheduled activities or events will have priority. Use of additional location(s) may be approved as mutually agreed upon between the CITY and JVA/BVCA provided JVA/BVCA informs the CITY of this request at least three months prior to the Event.
CITY reserves the right in its sole discretion at any time or times to cancel the Event and/or suspend the use of Event location(s) subject to this Agreement, for any duration to protect public health and safety. Any such closure will not constitute a breach or a default of this Agreement. CITY shall have no liability whatever to JVA/BVCA for the effect of such suspension and closure on any Event, nor shall CITY have any responsibility to provide JVA/BVCA with substitute Event dates or locations. JVA/BVCA’s rights under this Agreement are subject and subordinate to CITY’s police and emergency powers in addition to CITY’s rights to manage its municipal facilities, including outdoor public spaces and its contractual rights as described in this Agreement.
c. Event Permits and Agreements. JVA/BVCA shall obtain permits from CITY for each Event and shall enter into and comply with all agreements for such permits as required by CITY, including but not limited to:
• Any required permits from the Community Development
Department pertaining to building and safety review.
• Any required permits from the Los Angeles County Fire Department.
• Any required permits from the California Coastal
Commission.
65270.00001\44506815.1
JVA/BVCA Hermosa Beach National Championships 2026 - 2028 3 Exhibit A includes a sample Special Event Permit.
d. Fee to CITY. JVA/BVCA shall pay CITY direct and indirect costs including but not be limited to the provision of CITY staff time dedicated to the Event, Amplified Sound Permit fees, parking fees, daily special event category fees, daily set-up/tear-down fees, and co-sponsor fees.
e. Annual Review. Within sixty (60) days prior to and after each Event, JVA/BVCA shall provide an annual overview to the Parks, Recreation and Community Resources Advisory Commission in the form of an agendized presentation. The pre-event presentation shall highlight: a general event overview including anticipated number of attendees; an overview of the event footprint and individualized setup; and anticipated impacts to the community as a result of the event. The post-event presentation shall include: a general overview including the actual number of attendees; actual impact(s) to the community as a result of the event; and any event struggle(s) and success(es).
f. Environmental Sustainable Measures. JVA/BVCA shall implement the CITY’s environmental sustainability measures, including but not limited to:
• JVA/BVCA shall only use electric generators or
generators operated with a 50% blend of bio-diesel fuel, or equivalent or lower emissions sources.
• JVA/BVCA shall incorporate sustainability requirements into vendor agreements.
• JVA/BVCA shall advertise green measures and rules in
event advertising.
• JVA/BVCA shall limit single-use paper, packaging, and décor items.
• JVA/BVCA shall limit use of handouts, flyers, and
giveaways.
• JVA/BVCA shall enact a no-idling requirement for
vehicles.
• JVA/BVCA shall provide on-site personnel to ensure that litter and trash are minimized, and recycling is
maximized.
65270.00001\44506815.1
JVA/BVCA Hermosa Beach National Championships 2026 - 2028 4 • JVA/BVCA shall encourage vehicles used in connection
with the event, are hybrid, electric, or CNG vehicles.
• JVA/BVCA shall participate in pre-event and post-event reviews of compliance with sustainability measures.
g. Parking Spaces. JVA/BVCA may request dedicated use of public parking spaces as needed for Event activities including parking of Event-related vehicles; storage of essential Event-related equipment and supplies; and other Event-related structures for each Event. Use of these spaces must be mutually agreed upon between the CITY and JVA/BVCA following submittal of a site plan by JVA/BVCA outlining the use of the parking space(s) at least ten (10) working days prior to each Event. While approval of parking request(s) will not be unreasonably withheld, already scheduled activities or events will have priority. The CITY will consider approval based on the location, seasonal needs for parking, and the overall impacts to the loss of parking spaces to the area. JVA/BVCA shall ensure the spaces are clean from debris, and other materials that were collected as a result of Event activities.
h. Logistical Meetings. JVA/BVCA is required to participate in logistical and planning meetings with relevant CITY departments as requested by the City.
i. Restroom, Recycling, and Trash Facilities. JVA/BVCA shall provide an acceptable number of portable toilet facilities for each Event as determined by the CITY. JVA/BVCA shall provide trash and recycling receptacles for each Event as required by the CITY.
Recyclable items shall be separated from refuse/trash. JVA/BVCA shall coordinate with CITY’s franchisee refuser hauler to add recycling containers in convenient locations to ensure capacity and reduce litter. The location, delivery, and pick-up of these items must be mutually agreed upon between JVA/BVCA and the CITY prior to each Event.
j. Sponsorships; Tickets; Merchandise; and Broadcasting. CITY acknowledges and agrees that JVA/BVCA (i) may (and has the exclusive right to) promote and market the Events in its sole discretion, (ii) may (and has the exclusive right to) sell sponsorships, food and non-alcoholic beverages at Event in its sole discretion; provided that no Events sponsor will be promoting or marketing gambling, political, or religious viewpoints. Donating persons or entities must be consistent with the core values, mission, and vision
65270.00001\44506815.1
JVA/BVCA Hermosa Beach National Championships 2026 - 2028 5 of the City. CITY hereby grants to JVA/BVCA and each Event sponsor, at no charge to JVA/BVCA or such Event sponsor, the right to use and display the City of Hermosa Beach name in
advertisements, publicity, and promotions for Events. JVA/BVCA has the exclusive right to broadcast the Events in its sole discretion and JVA/BVCA is entitled to retain all revenues from such sales and broadcasts.
k. Insurance. JVA/BVCA shall provide comprehensive general liability insurance in the form of a certificate naming "the City of Hermosa Beach, its officers, agents, volunteers, and employees as additional insureds." JVA/BVCA shall maintain insurance coverage meeting the standards outlined in this Section at all times during the term of the Events permitted by this Agreement. All certificates are subject to approval of the City’s Risk Manager. Coverage shall be at least as broad as Insurance Services Form CG 00 01 covering commercial general liability on an "occurrence" basis, including property damage, bodily injury, death, and personal and advertising injury with limits no less than $2,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this Agreement, or the general aggregate limit shall be twice the required occurrence limit. The City reserves the right to request greater or lesser amounts of insurance coverage.
JVA/BVCA shall provide evidence that the commercial general liability insurance includes coverage for injuries to athletic participants and participant accident insurance. If JVA/BVCA maintains broader coverage and/or higher limits than the minimums shown above, the City requires and shall be entitled to the broader coverage and/or the higher limits maintained. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City. JVA/BVCA shall furnish properly executed certificates of insurance to City, which certificates shall clearly evidence all coverage required above and provide that such insurance shall not be materially changed, terminated or allowed to expire except on thirty (30) days prior written notice to City; and further, shall provide that if JVA/BVCA fails to pay any required deductible or self-insured retention, City may do so at JVA/BVCA’s expense.
l. Indemnification. JVA/BVCA shall indemnify and hold harmless the CITY, its officers, employees and agents from and against any and all claims, demands, losses, damages, costs and expenses (including but not limited to court costs, penalties, expert fees and reasonable attorneys’ fees), judgments, liabilities and causes of
65270.00001\44506815.1
JVA/BVCA Hermosa Beach National Championships 2026 - 2028 6 action of any nature whatsoever and damages for injuries to persons and property arising from JVA/BVCA‘s use of City Property pursuant to this Agreement, including but not limited to JVA/BVCA‘s negligent or wrongful acts, errors or omissions in the set-up, operation and tear-down of its improvements and use of City Property by JVA/BVCA’s guests, patrons, invitees, customers, employees, officers, and contractors hired in connection with this Agreement. JVA/BVCA shall promptly pay the amount of any final and non-appealable judgment rendered against CITY, its officers, employees and agents for any such indemnified claims, and reasonable costs, and reasonable expert and attorney fees incurred by CITY in the defense of such claims. JVA/BVCA’s obligations under this Section shall survive any termination of this Agreement.
Section 3. CITY’s Duties.
a. Event Permits. CITY shall provide event permits to JVA/BVCA for each Event unless CITY determines in its sole discretion that it would not be in the public interest or that it would be averse to the public health, safety, or welfare.
b. No Parking Signs. The CITY shall post no parking signs in parking Lot B at least 72 hours prior to the start of event setup.
Section 4. Assignment. This Agreement may not be assigned in whole or in part by either party, without the prior written consent of the other party. This Agreement is binding upon, and will inure to the benefit of, the successors and permitted assigns of each party.
Section 5. Independent Contractor. JVA/BVCA will act hereunder as an independent contractor. This Agreement shall not and is not intended to constitute JVA/BVCA as an agent, servant, or employee of CITY and shall not and is not intended to create the relationship of partnership, joint venture or association between CITY and JVA/BVCA.
Section 6. Termination. CITY may terminate this Agreement upon thirty (30) days written notice to JVA/BVCA if CITY determines in its sole discretion that continuation of this Agreement would not be in the public interest, that it would be adverse to the public health, safety, or welfare, or that a substantial portion of CITY’s property is unavailable due to construction activity. Prior to termination on the ground that a substantial portion of CITY’s property is unavailable due to construction activity, CITY shall provide JVA/BVCA an opportunity to propose
65270.00001\44506815.1
JVA/BVCA Hermosa Beach National Championships 2026 - 2028 7 adjustments to the venue or an alternative location for the event. JVA/BVCA’s proposed adjustments or alternative shall be provided within thirty (30) days of written notice from CITY and is subject to approval of the City Council, in its sole discretion, in a public meeting. JVA/BVCA may terminate this Agreement upon written notice if any casualty or other cause beyond the reasonable control of JVA/BVCA prohibits or materially impedes JVA/BVCA from conducting any Event in the manner required by the CITY. Upon termination of the Agreement, any events subsequent to the termination will no longer be the responsibility of JVA/BVCA.
Section 7. Notice. Any notice, demand, request, approval or communication required to be made or given pursuant to this Agreement may either be personally served upon the other Party or deposited in the United States mail, postage prepaid as follows:
For JVA: Jenny Hahn
1414 Underwood Avenue, Suite 404
Milwaukee, WI, 532213
For BVCA: Jeff Smith
14127 Segundo Court
Poway, CA 92064
(858) 405-4306
For CITY: City of Hermosa Beach
1315 Valley Drive
Hermosa Beach, California 90254
(310) 318-0216
Attention: Steve Napolitano
Any notices so given pursuant to the provision of this paragraph will be deemed served twenty-four (24) hours after the deposit thereof in the United States mail.
Section 8. Entire Agreement. This Agreement represents the entire integrated agreement between CITY and JVA/BVCA, and supersedes all prior negotiations, representations or agreements, either written or oral, with respect to the subject matter of this Agreement. This Agreement may be amended only by a written instrument signed by both parties. The parties anticipate that, in addition to this Agreement, they will enter into a mutually acceptable event agreement for each Event setting forth precise terms and conditions applicable to that Event.
This Agreement may be executed in counterparts, each of which is deemed an original, but all of which together are deemed to be one and the same
65270.00001\44506815.1
JVA/BVCA Hermosa Beach National Championships 2026 - 2028 8 agreement. A signed copy of this Agreement delivered by email or other means of electronic transmission is deemed to have the same legal effect as delivery of an original signed copy of this Agreement.
Section 9. Representations and Warranties. Each party hereby represents and warrants to the other party as of the date of this Agreement as follows:
a. It has the full power and authority to enter into this Agreement and perform each of its obligations hereunder;
b. This Agreement constitutes a legal, valid, and binding obligation of such party, enforceable against it in accordance with the terms of this Agreement, subject to creditors’ rights and general principles of equity; c. Such party’s execution and delivery of this Agreement, and its performance hereunder, will not violate or conflict with any other contract or agreement to which it is a party, any applicable law, or any court order or decree to which it is subject;
d. It is legally authorized and has obtained all necessary regulatory approvals for the execution, delivery, and performance of this Agreement;
e. No litigation or pending or threatened (in writing) claims of litigation exist which would reasonably be likely to adversely affect its ability to fully perform its obligations hereunder or the rights granted by it to the other party under this Agreement;
f. Such party’s employees (and employes of its subsidiaries, affiliates, assigns, representatives, licensees, or others contracting with such party to work at any Event) are, to the extent such position is covered by any collective bargaining agreement or to the extent there is any agreement obligating such function to be performed by union members, members of the appropriate union.
Section 10. Choice of Law. This Agreement shall be deemed to be made, governed by, and construed in accordance with the laws of the State of California without giving effect to the conflict of law principles thereof.
Section 11. Severability. If any provision or a portion of any provision of this Agreement is held to be unenforceable or invalid by a court of competent jurisdiction, the validity and enforceability of the enforceable portion of any such provision and/or the remaining provisions shall not be affected thereby.
65270.00001\44506815.1
JVA/BVCA Hermosa Beach National Championships 2026 - 2028 9 Section 12. Waiver. The failure of any Party to enforce any of the provisions of this Agreement, or any rights with respect hereto, or the failure to exercise any election provided for herein, will in no way be considered a waiver of such provisions, rights, or elections, or in any way affect the validity of this Agreement.
The failure of any Party to enforce any of such provisions, rights, or elections will not prejudice such Party from later enforcing or exercising the same or any other provisions, rights, or elections which it may have under this Agreement.
EXECUTED the day and year first above stated.
Junior Volleyball Association
By: ____________________________________
Jenny Hahn
Beach Volleyball Clubs of America
By: ____________________________________
Jeff Smith
CITY OF HERMOSA BEACH
By:___________________________________
Rob Saemann, Mayor
APPROVED AS TO FORM ATTEST
By:_________________________________ By:_________________________________ Jason Baltimore, Interim City Attorney Myra Maravilla, City Clerk
TENTATIVE
2026 SPECIAL EVENTS
CALENDAR
City of Hermosa Beach
Community Resources Department
710 Pier Avenue, Hermosa Beach, CA 90254
(310) 318-0280
[email protected]
Sun Mon Tue Wed Thu Fri Sat
1 2 3
4 AAU Southern Pacific
Grand Prix Series
North Volleyball Courts
5 6 7 8 9 10
11 IBVL Tournament Series
North Volleyball Courts
12 13 14 15 16 17
18 19 AAU Southern Pacific
Grand Prix Series
North Volleyball Courts
PENDING
20 21 22 23 Sidewalk Sale
Hermosa Avenue,
Pier Avenue & Pier Plaza
Impact Level II
PENDING
24 IBVL Tournament Series
North Volleyball Courts
Sidewalk Sale
Hermosa Avenue,
Pier Avenue & Pier Plaza
Impact Level II
PENDING
25 IBVL Tournament Series
North Volleyball Courts
Sidewalk Sale
Hermosa Avenue,
Pier Avenue & Pier Plaza
Impact Level II
PENDING
26 27 28 29 30 31
January 2026
Impact Level I
Impact Level II
Impact Level III
Long-term Agreement
City Hosted
City Contracted Event
Sun Mon Tue Wed Thu Fri Sat
1 AAU Southern Pacific
Grand Prix Series
North Volleyball Courts
PENDING
2 3 4 5 6 Winter Challenge
North Volleyball Courts
(Setup)
7 Winter Challenge
North Volleyball Courts
8 9 10 11 12 13 14 SoCal
Beach Foundation
North Volleyball Courts
15 IBVL Tournament Series
North Volleyball Courts
16 AAU Southern Pacific
Grand Prix Series
North Volleyball Courts
PENDING
17 18 19 20 21
22 AAU Southern Pacific
Grand Prix Series
North Volleyball Courts
PENDING
23 24 25 26 27 28 HBLL Opening Day
Clark Field
Impact Level II
February 2026
Impact Level I
Impact Level II
Impact Level III
Long-term Agreement
City Hosted
City Contracted Event
Sun Mon Tue Wed Thu Fri Sat
1 IBVL Tournament Series
North Volleyball Courts
2 3 4 5 6 Beach Tennis Tournament
Beach Tennis Courts
7 Beach Tennis
Tournament
Beach Tennis Courts
8 Beach Tennis
Tournament
Beach Tennis Courts
9 10 11 12 13 14 St. Patrick’s Day Parade
Valley Drive, Pier Avenue,
Hermosa Avenue,
Schumacher Plaza, & Pier Plaza
Impact Level III
PENDING
SoCal
Beach Foundation
North Volleyball Courts
PENDING
15 AAU Southern Pacific
Grand Prix Series
North Volleyball Courts
PENDING
16 17 18 19 20 21 SoCal
Beach Foundation
North Volleyball Courts
PENDING
22 CBVA
North Volleyball Courts
23 24 25 26 27 28 SoCal
Beach Foundation
North Volleyball Courts
29 AAU Southern Pacific
Grand Prix Series
North Volleyball Courts
PENDING
30 31
March 2026
Impact Level I
Impact Level II
Impact Level III
Long-term Agreement
City Hosted
City Contracted Event
Sun Mon Tue Wed Thu Fri Sat
1 2 3 4
5 Easter Sunrise Mass
South of Pier
AAU Southern Pacific
Grand Prix Series
North Volleyball Courts
PENDING
6 7 8 9 10 Beach Tennis Tournament
Beach Tennis Courts
11 CBVA
North Volleyball Courts
Beach Tennis Tournament
Beach Tennis Courts
12 AAU Southern Pacific
Grand Prix Series
North Volleyball Courts
PENDING
Beach Tennis Tournament
Beach Tennis Courts
13 14 15 16 17
Sidewalk Sale
Hermosa Avenue,
Pier Avenue & Pier Plaza
Impact Level II
18 Sidewalk Sale
Hermosa Avenue,
Pier Avenue & Pier Plaza
Impact Level II
SoCal
Beach Foundation
North Volleyball Courts
19 IBVL Tournament Series
North Volleyball Courts
Sidewalk Sale
Hermosa Avenue,
Pier Avenue & Pier Plaza
Impact Level II
PENDING
20 21 22 23 24 Surfers Walk of Fame
Kick-off Party
Community Theatre
Impact Level II
25 Surfers Walk of Fame
Spyder Surf Fest
Pier Plaza
Impact Level III
26 Tower 12 South Bay
Surf Series
South of the Pier
27 28 29 30
April 2026 Impact Level I
Impact Level II
Impact Level III
Long-term Agreement
City Hosted or City Contracted Event
Sun Mon Tue Wed Thu Fri Sat
1 2 Classic Car Show
Schumacher Plaza & Pier
Plaza
Impact Level I
Pets in the Park
Valley Park
Impact Level II
HBLL Night at the Ballpark
Clark Field
3 AAU Southern Pacific Grand Prix Series
North Volleyball Courts
PENDING
4 5 6 7 8 9 CBVA
North Volleyball Courts
Impact Level III
10 AAU Southern Pacific Grand Prix Series
North Volleyball Courts
PENDING
11 12 13 14 15 16 State of the Art
Cypress Avenue & 6th St.
Impact Level III
SoCal Beach Foundation
North Volleyball Courts
17 SoCal
Beach Foundation
North Volleyball Courts
18 19 20 21 Fiesta Hermosa
Pier Avenue, Hermosa Avenue,
Pier Plaza,
Schumacher Plaza, Lot A
(Setup)
Impact Level III
PENDING
22 CBVA
North Volleyball Courts
(Setup)
Fiesta Hermosa
Pier Avenue, Hermosa Avenue, Pier
Plaza, Schumacher Plaza, Lot A
(Setup)
Impact Level III
PENDING
23 CBVA
North Volleyball Courts
Fiesta Hermosa
Pier Avenue, Hermosa Avenue, Pier Plaza,
Schumacher Plaza, Lot A
Impact Level III
PENDING
24 CBVA
North Volleyball Courts
Fiesta Hermosa
Pier Avenue, Hermosa Avenue, Pier Plaza, Schumacher Plaza, Lot A Impact Level III
PENDING
25 CBVA
North Volleyball Courts
Fiesta Hermosa
Pier Avenue, Hermosa Avenue, Pier Plaza, Schumacher Plaza, Lot A (Teardown)
Impact Level III
PENDING
26 Fiesta Hermosa
Pier Avenue, Hermosa
Avenue, Pier Plaza,
Schumacher Plaza,
Lot A
(Teardown)
Impact Level III
PENDING
27 28 Beach Tennis
Tournaments
Beach Tennis Courts
(Setup)
29 Beach Tennis Tournaments
Beach Tennis Courts
30 You Are Enough 5k
Schumacher Plaza &
Strand North of Pier
Beach Tennis
Tournaments
Beach Tennis Courts
31 Beach Tennis Tournaments
Beach Tennis Courts
AAU Southern Pacific Grand Prix Series
North Volleyball Courts
PENDING
May 2026
Impact Level I
Impact Level II
Impact Level III
Long-term Agreement
City Hosted
City Contracted Event
June 2026
Impact Level I
Impact Level II
Impact Level III
Long-term Agreement
City Hosted
City Contracted Event
Sun Mon Tue Wed Thu Fri Sat
1 2 3 4 5 6 NOTHING WEEKEND
7 NOTHING WEEKEND 8 9 Beach Collegiate
National Team
Training Block
North Volleyball Courts
10 Beach Collegiate
National Team
Training Block
North Volleyball Courts
11 Beach Collegiate
National Team
Training Block
North Volleyball Courts
12 Fine Arts Festival
Community Center Lawn
(Load-in)
Impact Level III
Beach Collegiate National
Team Training Block
North Volleyball Courts
13 Fine Arts Festival
Community Center Lawn
Impact Level III
Out of System 4 Eyes
Tournament
North Volleyball Courts
14 Fine Arts Festival
Community Center Lawn
Impact Level III
15 World Championship Trials
North Volleyball Courts
16 World Championship Trials
North Volleyball Courts
17 World Championship Trials
North Volleyball Courts
18 World Championship Trials
North Volleyball Courts
19 20 AAU Southern Pacific
Grand Prix Series
North Volleyball Courts
PENDING
South Bay Paddle
South of Pier
21 AAU Southern Pacific
Grand Prix Series
North Volleyball Courts
PENDING
22 23 24 25 26 Beach Tennis
Tournament
Beach Tennis Courts
27 Smackfest Co-ed 4’s
Volleyball Tournament
North Volleyball Courts
28 Beach Tennis
Tournament
Beach Tennis Courts
29 30
July 2026
Sun Mon Tue Wed Thu Fri Sat
1 2 3 4
5 6 JVA/BVCA
National Championships
North & South
Volleyball Courts &
Beach Tennis Courts
(Setup)
Impact Level III
PENDING
7 JVA/BVCA National Championships
North & South Volleyball Courts &
Beach Tennis Courts
Impact Level III
PENDING
8 JVA/BVCA
National Championships
North & South
Volleyball Courts &
Beach Tennis Courts
Impact Level III
PENDING
Shakespeare by the Sea
Valley Park
Impact Level I
9 JVA/BVCA
National Championships
North & South
Volleyball Courts &
Beach Tennis Courts
Impact Level III
PENDING
Shakespeare by the Sea
Valley Park
Impact Level I
10 JVA/BVCA
National Championships
North & South
Volleyball Courts &
Beach Tennis Courts
Impact Level III
PENDING
11 JVA/BVCA
National Championships
North & South
Volleyball Courts &
Beach Tennis Courts
Impact Level III
PENDING
12 AAU
Hermosa Beach Championships
North & South
Volleyball Courts &
Beach Tennis Courts
(Setup)
Impact Level III
PENDING
LA Galaxy Soccer Celebration
South of the Pier
Impact Level III
(Setup)
PENDING
13 AAU
Hermosa Beach
Championships
North & South
Volleyball Courts &
Beach Tennis Courts
Impact Level III
PENDING
LA Galaxy Soccer Celebration
South of the Pier
Impact Level III
(Setup)
PENDING
14 AAU
Hermosa Beach Championships
North & South Volleyball Courts &
Beach Tennis Courts
Impact Level III
PENDING
LA Galaxy Soccer Celebration
South of the Pier
Impact Level III
PENDING
15 AAU
Hermosa Beach
Championships
North & South
Volleyball Courts &
Beach Tennis Courts
Impact Level III
PENDING
LA Galaxy Soccer Celebration
South of the Pier
Impact Level III
PENDING
16 AAU
Hermosa Beach
Championships
North & South
Volleyball Courts &
Beach Tennis Courts
Impact Level III
PENDING
LA Galaxy Soccer Celebration
South of the Pier
Impact Level III
PENDING
17 AAU
Hermosa Beach
Championships
North & South
Volleyball Courts &
Beach Tennis Courts
Impact Level III
PENDING
LA Galaxy Soccer Celebration
South of the Pier
Impact Level III
PENDING
18 AAU
Hermosa Beach
Championships
North & South
Volleyball Courts &
Beach Tennis Courts
Impact Level III
PENDING
LA Galaxy Soccer Celebration
South of the Pier
Impact Level III
PENDING
19 AAU
Hermosa Beach Championships
North & South Volleyball Courts &
Beach Tennis Courts
Impact Level III
PENDING
LA Galaxy Soccer Celebration
South of the Pier
Impact Level III
PENDING
20 AAU
Hermosa Beach Championships
North & South Volleyball Courts &
Beach Tennis Courts
Impact Level III
PENDING
LA Galaxy Soccer Celebration
South of the Pier
(Teardown)
Impact Level III
PENDING
21 AAU
Hermosa Beach Championships
North & South Volleyball Courts &
Beach Tennis Courts
Impact Level III
PENDING
AVP Junior National Championships
North & South Volleyball Courts &
Beach Tennis Courts
(Setup)
Impact Level III
PENDING
22 AVP Junior National
Championships
North & South
Volleyball Courts &
Beach Tennis Courts
Impact Level III
PENDING
23 AVP Junior National
Championships
North & South
Volleyball Courts &
Beach Tennis Courts
Impact Level III
PENDING
24 AVP Junior National
Championships
North & South
Volleyball Courts &
Beach Tennis Courts
Impact Level III
PENDING
25 AVP Junior National
Championships
North & South
Volleyball Courts &
Beach Tennis Courts
Impact Level III
PENDING
26 AVP Junior National Championships
North & South Volleyball Courts &
Beach Tennis Courts
Impact Level III
PENDING
27 AVP Junior National
Championships
North & South
Volleyball Courts &
Beach Tennis Courts
(Teardown)
Impact Level III
PENDING
28 29
International
Surf Festival
North & South of Pier &
North Volleyball Courts
(Setup)
Impact Level III
PENDING
30 International
Surf Festival
North & South of Pier &
North Volleyball Courts
(Setup)
Impact Level III
PENDING
31 International
Surf Festival
North & South of Pier &
North Volleyball Courts
Impact Level III
PENDING
Impact Level I
Impact Level II
Impact Level III
Long-term Agreement
City Hosted
City Contracted Event
Sun Mon Tue Wed Thu Fri Sat
1 International
Surf Festival
North & South of Pier &
North Volleyball Courts (CBVA)
Impact Level III
2 International
Surf Festival
North & South of Pier
Impact Level III
3 International
Surf Festival
North & South of Pier
(Load-out)
Impact Level III
4 5 6 7 Triathlon
Downtown
(Load-in)
Impact Level III
8 Triathlon
Downtown
(Load-in)
Impact Level III
CBVA
North Volleyball Courts
9 Triathlon
Downtown
Impact Level III
CBVA
North Volleyball Courts
\
10 11 12 13 14 Sidewalk Sale
Hermosa Avenue,
Pier Avenue & Pier Plaza
Impact Level II
PENDING
Beach Tennis Tournament
Beach Tennis Courts
15 Sidewalk Sale
Hermosa Avenue, Pier Avenue & Pier Plaza
Impact Level II
PENDING
Beach Tennis Tournament
Beach Tennis Courts
16 Sidewalk Sale
Hermosa Avenue, Pier Avenue & Pier
Plaza
Impact Level II
PENDING
Beach Tennis Tournament
Beach Tennis Courts
17 18 19 20 21 22 NOTHING WEEKEND
23 NOTHING WEEKEND 24 25 26 27 28 29 AAU High School Boys Beach Volleyball League Matches
North Volleyball Courts
PENDING
30 31
August 2026
Impact Level I
Impact Level II
Impact Level III
Long-term Agreement
City Hosted
City Contracted Event
Sun Mon Tue Wed Thu Fri Sat
1 2 3 Fiesta Hermosa
Pier Avenue, Hermosa
Avenue, Pier Plaza,
Lot A, Lot B
(Setup)
Impact Level III
PENDING
4 CBVA
North Volleyball Courts
and Schumacher Plaza
(Setup)
Fiesta Hermosa
Pier Avenue, Hermosa
Avenue, Pier Plaza,
Lot A, Lot B
Impact Level III
5 CBVA
North Volleyball Courts
and Schumacher Plaza
Fiesta Hermosa
Pier Avenue, Hermosa
Avenue, Pier Plaza,
Lot A, Lot B
Impact Level III
PENDING
6 CBVA
North Volleyball Courts
and Schumacher Plaza
Fiesta Hermosa
Pier Avenue, Hermosa
Avenue, Pier Plaza,
Lot A, Lot B
(Teardown)
Impact Level III
PENDING
7 8 Hermosa Beach Open
North Volleyball Courts
(Set-up)
Impact Level III
9 Hermosa Beach Open
North Volleyball Courts
(Set-up)
Impact Level III
10 Hermosa Beach
Concert Series
South of Pier
(Setup)
Impact Level III
Hermosa Beach Open
North Volleyball Courts
Impact Level III
11 Hermosa Beach
Concert Series
South of Pier
(Setup)
Impact Level III
Hermosa Beach Open
North Volleyball Courts
Impact Level III
12 Movies at the Beach
South of Pier
(Utilizing Hermosa Beach
Concert Series
Infrastructure)
Impact Level III
Hermosa Beach Open
North Volleyball Courts
Impact Level III
13 Hermosa Beach
Concert Series
South of Pier
Impact Level III
Hermosa Beach Open
North Volleyball Courts
Impact Level III
14 Hermosa Beach
Concert Series
South of Pier
(Event Infrastructure Only)
Impact Level III
15 Hermosa Beach
Concert Series
South of Pier
(Event Infrastructure Only)
Impact Level III
16 Hermosa Beach
Concert Series
South of Pier
(Event Infrastructure Only)
Impact Level III
17 Hermosa Beach
Concert Series
South of Pier
(Event Infrastructure Only)
Impact Level III
18 Hermosa Beach
Concert Series
South of Pier
(Event Infrastructure Only)
Impact Level III
19 Movies at the Beach
South of Pier
(Utilizing Hermosa Beach
Concert Series
Infrastructure)
Impact Level III
Coastal Cleanup Day
Schumacher Plaza,
North & South of Pier
Impact Level I
20 Hermosa Beach
Concert Series
South of Pier
Impact Level III
21 Hermosa Beach
Concert Series
South of Pier
(Teardown)
Impact Level III
22 23 24 25 SoCal
Beach Foundation
North Volleyball Courts
(Setup)
26 SoCal
Beach Foundation
North Volleyball Courts
27 AAU High School Boys
Beach Volleyball
League Matches
North Volleyball Courts
28 29 30
September 2026
Impact Level I
Impact Level II
Impact Level III
Long-term Agreement
City Hosted
City Contracted Event
Sun Mon Tue Wed Thu Fri Sat
1 2 3 Glow Ride for Cystic Fibrosis
Schumacher Plaza and the Strand
AAU High School Boys Beach
Volleyball League Matches
North Volleyball Courts
PENDING
4 5 6 7 8 9 10 Pumpkins in the Park
Edith Rodaway Park
Impact Level II
Walk to End Alzheimer's
Pier Plaza and Strand North of Pier
11 AAU High School Boys Beach
Volleyball League Matches
North Volleyball Courts
PENDING
12 13 14 15 16 17 Volley4Sound
North Volleyball Courts
18 Skechers Pier to Pier
Friendship Walk
Strand (North of Pier) &
Pier Plaza
Impact Level III
AAU High School Boys Beach
Volleyball League Matches
North Volleyball Courts
PENDING
19 20 21 22 23 Beach Tennis Tournament
Beach Tennis Courts
24 IBVL Tournament Series
North Volleyball Courts
Beach Tennis Tournament
Beach Tennis Courts
25 Beach Tennis Tournament
Beach Tennis Courts
26 27 28 29 30 31 AAU Southern Pacific
Grand Prix Series
North Volleyball Courts
PENDING
October 2026
Impact Level I
Impact Level II
Impact Level III
Long-term Agreement
City Hosted
City Contracted Event
Sun Mon Tue Wed Thu Fri Sat
1 2 3 4 5 6 7
8 AAU Southern Pacific Grand Prix Series
North Volleyball Courts
PENDING
9 10 11 Veterans Day
Wreath Laying
Ceremony
Community Center East Lawn
Impact Level II
12 13 14 IBVL Tournament Series
North Volleyball Courts
15 AAU Southern Pacific Grand Prix Series
North Volleyball Courts
PENDING
16 17 18 19 Hermosa for the Holidays
Locations TBD
(Setup)
Impact Level III
PENDING
20 Hermosa for the Holidays
Locations TBD
(Setup)
Impact Level III
PENDING
21Hermosa for the Holidays
Locations TBD
Impact Level III
PENDING
22 Hermosa for the Holidays
Locations TBD
(Teardown)
Impact Level III
PENDING
23 24 25 26 27 28
29 AAU Southern Pacific Grand Prix Series
North Volleyball Courts
PENDING
30 November 2026
Impact Level I
Impact Level II
Impact Level III
Long-term Agreement
City Hosted
City Contracted Event
Sun Mon Tue Wed Thu Fri Sat
1 2 3 4 5 Sand Snowman Contest
North of Pier
Impact Level I
AAU Southern Pacific Grand Prix Series
North Volleyball Courts
PENDING
6 Community Chanukah Celebration*
Pier Plaza &
Greenwood Park
Impact Level II
7 8 9 10 11 12 California Great Santa Stroll
Strand North of Pier & Pier Plaza
Impact Level III
AAU Southern Pacific Grand Prix Series
North Volleyball Courts
PENDING
13 IBVL Tournament Series
North Volleyball Courts
14 15 16 17 18 19
20 IBVL Tournament Series
North Volleyball Courts
21 22 23 24 25 26 AAU Southern Pacific
Grand Prix Series
North Volleyball Courts
PENDING
27 28 29 30 IBVL Tournament Series
North Volleyball Courts
31 December 2026
*Menorah installation at Greenwood Park is Wednesday, December 2, 2026 and the Menorah is removed Monday, December 14, 2026 Impact Level I
Impact Level II
Impact Level III
Long-term Agreement
City Hosted
City Contracted Event
Off-Season Monthly Events
(Labor Day – Memorial Day) # of Special Event Days # of Days Available(out of 15) January 6 9
February 8 7
March 10 5
April 10 5
May (through May 24) 10 5
September (from September 8) 17 -2
October 9 6
November 9 6
December 7 8
Peak Season (Memorial Day through Labor Day) # of Special Event Days on the Beach/Strand/Pier Plaza Level I & II Event Days
(not on Level III Event Days)
& City Sponsored/Contracted
(not on Level III, II or I Event Days)
(Maximum of 25)
Level III Event Days
(Maximum of 45)
Total # of Event Days
(out of 70 total)
18 42 60
Peak Season Event Limits:
To balance coastal access with events, events on the Beach, Strand & Pier Plaza will be limited to the following number of events during the peak summer season (Memorial Day to Labor Day – approximately 100 days over the summer):
o Maximum of 45 days used by Level III Events
o Maximum of 25 days used by Level I & II Events, & City Sponsored/Contracted Events (on days not used by Level III Events) City Sponsored or City Contracted Events, & Long-term Agreement Events are categorized by their Impact Level
TENTATIVE
2027 SPECIAL EVENTS
CALENDAR
City of Hermosa Beach
Community Resources Department
710 Pier Avenue, Hermosa Beach, CA 90254
(310) 318-0280
[email protected]
Sun Mon Tue Wed Thu Fri Sat
1 2 AAU Southern Pacific
Grand Prix Series
North Volleyball Courts
PENDING
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 AAU Southern Pacific
Grand Prix Series
North Volleyball Courts
PENDING
19 20 21 22 23
24 25 26 27 28 29 30
31 AAU Southern Pacific
Grand Prix Series
North Volleyball Courts
PENDING
January 2027
Sun Mon Tue Wed Thu Fri Sat
1 2 3 4 5 6
7 8 9 10 11 12 13
14 AAU Southern Pacific
Grand Prix Series
North Volleyball Courts
PENDING
15 AAU Southern Pacific
Grand Prix Series
North Volleyball Courts
PENDING
16 17 18 19 20
21 22 23 24 25 26 27
28 AAU Southern Pacific
Grand Prix Series
North Volleyball Courts
PENDING
February 2027
Sun Mon Tue Wed Thu Fri Sat
1 2 3 4 5 6
7 8 9 10 11 12 13 AAU Southern Pacific
Grand Prix Series
North Volleyball Courts
PENDING
14 AAU Southern Pacific
Grand Prix Series
North Volleyball Courts
PENDING
15 16 17 18 19 20
21 22 23 24 25 26 27
28 AAU Southern Pacific
Grand Prix Series
North Volleyball Courts
PENDING
29 30 31
March 2027
Sun Mon Tue Wed Thu Fri Sat
1 2 3 AAU Southern Pacific
Grand Prix Series
North Volleyball Courts
PENDING
4 AAU Southern Pacific
Grand Prix Series
North Volleyball Courts
PENDING
5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23
Surfers Walk of Fame
Kick-off Party
Community Theatre
impact Level II
24 Surfers Walk of Fame
Impact Level III
25 26 27 28 29 30
April 2027
Sun Mon Tue Wed Thu Fri Sat
1 2 AAU Southern Pacific
Grand Prix Series
North Volleyball Courts
PENDING
3 4 5 6 7 8
9 AAU Southern Pacific
Grand Prix Series
North Volleyball Courts
PENDING
10 11 12 13 14 15
State of the Art
Cypress Avenue & 6th St.
Impact Level III
PENDNG
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30 31
May 2027
Sun Mon Tue Wed Thu Fri Sat
1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19 AAU Southern Pacific
Grand Prix Series
North Volleyball Courts
PENDING
20 AAU Southern Pacific
Grand Prix Series
North Volleyball Courts
PENDING
21 22 23 24 25 26
27 28 29 30
June 2027
Sun Mon Tue Wed Thu Fri Sat
1 2 3
4 5 6 JVA/BVCA
National Championships
North & South
Volleyball Courts &
Beach Tennis Courts
Impact Level III
PENDING
7 JVA/BVCA
National Championships
North & South
Volleyball Courts &
Beach Tennis Courts
Impact Level III
PENDING
8 JVA/BVCA
National Championships
North & South
Volleyball Courts &
Beach Tennis Courts
Impact Level III
PENDING
9 JVA/BVCA
National Championships
North & South
Volleyball Courts &
Beach Tennis Courts
Impact Level III
PENDING
10 JVA/BVCA
National Championships
North & South
Volleyball Courts &
Beach Tennis Courts
Impact Level III
PENDING
11 JVA/BVCA
National Championships
North & South
Volleyball Courts &
Beach Tennis Courts
Impact Level III
PENDING
12 JVA/BVCA
National Championships
North & South
Volleyball Courts &
Beach Tennis Courts
Impact Level III
PENDING
AAU
Hermosa Beach
Championships
North & South
Volleyball Courts &
Beach Tennis Courts
Impact Level III
PENDING
13 AAU
Hermosa Beach
Championships
North & South
Volleyball Courts &
Beach Tennis Courts
Impact Level III
PENDING
14 AAU
Hermosa Beach
Championships
North & South
Volleyball Courts &
Beach Tennis Courts
Impact Level III
PENDING
15 AAU
Hermosa Beach
Championships
North & South
Volleyball Courts &
Beach Tennis Courts
Impact Level III
PENDING
16 AAU
Hermosa Beach
Championships
North & South
Volleyball Courts &
Beach Tennis Courts
Impact Level III
PENDING
17 AAU
Hermosa Beach
Championships
North & South
Volleyball Courts &
Beach Tennis Courts
Impact Level III
PENDING
18 AAU
Hermosa Beach
Championships
North & South
Volleyball Courts &
Beach Tennis Courts
Impact Level III
PENDING
19 AAU
Hermosa Beach
Championships
North & South
Volleyball Courts &
Beach Tennis Courts
Impact Level II
PENDING
AVP Junior National
Championships
North & South
Volleyball Courts &
Beach Tennis Courts
Impact Level III
PENDING
20 AVP Junior National
Championships
North & South
Volleyball Courts &
Beach Tennis Courts
Impact Level III
PENDING
21 AVP Junior National
Championships
North & South
Volleyball Courts &
Beach Tennis Courts
Impact Level III
PENDING
22 AVP Junior National
Championships
North & South
Volleyball Courts &
Beach Tennis Courts
Impact Level III
PENDING
23 AVP Junior National
Championships
North & South
Volleyball Courts &
Beach Tennis Courts
Impact Level III
PENDING
24 AVP Junior National
Championships
North & South
Volleyball Courts &
Beach Tennis Courts
Impact Level III
PENDING
25 AVP Junior National
Championships
North & South
Volleyball Courts &
Beach Tennis Courts
Impact Level III
PENDING
26 AVP Junior National
Championships
North & South
Volleyball Courts &
Beach Tennis Courts
Impact Level III
PENDING
27 AVP Junior National
Championships
North & South
Volleyball Courts &
Beach Tennis Courts
Impact Level III
PENDING
28 29 30 31
July 2027
Impact Level I
Impact Level II
Impact Level III
Long-term Agreement
City Hosted
City Contracted Event
Sun Mon Tue Wed Thu Fri Sat
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28 AAU High School Boys Beach
Volleyball League Matches
North Volleyball Courts
PENDING
29 30 31
August 2027
Sun Mon Tue Wed Thu Fri Sat
1 2 3 4
5 6 7
Hermosa Beach Open
North Volleyball Courts
(Set-up)
Impact Level III
8 Hermosa Beach Open
North Volleyball Courts
(Set-up)
Impact Level III
9 Hermosa Beach
Concert Series
South of Pier
(Setup)
Impact Level III
Hermosa Beach Open
North Volleyball Courts
Impact Level III
10 Hermosa Beach
Concert Series
South of Pier
(Setup)
Impact Level III
Hermosa Beach Open
North Volleyball Courts
Impact Level III
11 Movies at the Beach
South of Pier
(Utilizing Hermosa Beach
Concert Series
Infrastructure)
Impact Level III
PENDING
Hermosa Beach Open
North Volleyball Courts
Impact Level III
12 Hermosa Beach
Concert Series
South of Pier
Impact Level III
Hermosa Beach Open
North Volleyball Courts
Impact Level III
13 Hermosa Beach
Concert Series
South of Pier
(Event Infrastructure Only)
Impact Level III
14 Hermosa Beach
Concert Series
South of Pier
(Event Infrastructure Only)
Impact Level III
15 Hermosa Beach
Concert Series
South of Pier
(Event Infrastructure Only)
Impact Level III
16 Hermosa Beach
Concert Series
South of Pier
(Event Infrastructure Only)
Impact Level III
17 Hermosa Beach
Concert Series
South of Pier
(Event Infrastructure Only)
Impact Level III
18 Movies at the Beach
South of Pier
(Utilizing Hermosa Beach
Concert Series
Infrastructure)
Impact Level III
PENDING
AAU High School Boys
Beach Volleyball League
Matches
North Volleyball Courts
PENDING
19 Hermosa Beach
Concert Series
South of Pier
Impact Level III
20 Hermosa Beach
Concert Series
South of Pier
(Teardown)
Impact Level III
21 22 23 24 25
26 27 28 29 30
September 2027
Sun Mon Tue Wed Thu Fri Sat
1 2 AAU Southern Pacific
Grand Prix Series
North Volleyball Courts
PENDING
3 4 5 6 7 8 9 AAU High School Boys
Beach Volleyball League
Matches
North Volleyball Courts
PENDING
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
31 AAU Southern Pacific
Grand Prix Series
North Volleyball Courts
PENDING
October 2027
Sun Mon Tue Wed Thu Fri Sat
1 2 3 4 5 6 AAU Southern Pacific
Grand Prix Series
North Volleyball Courts
PENDING
7 8 9 10 11
Veterans Day
Wreath Laying
Ceremony
Community Center
East Lawn
Impact Level II
12 13
14 AAU Southern Pacific
Grand Prix Series
North Volleyball Courts
PENDING
15 16 17 18 19 20
21 22 23 24 25 26 27 AAU Southern Pacific
Grand Prix Series
North Volleyball Courts
PENDING
28 29 30
November 2027
Sun Mon Tue Wed Thu Fri Sat
1 2 3 4 Sand Snowman
Contest
North of Pier
Impact Level I
AAU Southern Pacific
Grand Prix Series
North Volleyball Courts
PENDING
5 6 7 8 9 10 11
12 13 14 15 16 17 18 AAU Southern Pacific
Grand Prix Series
North Volleyball Courts
PENDING
19 20 21 22 23 24 25
26 AAU Southern Pacific
Grand Prix Series
North Volleyball Courts
PENDING
27 28 29 30 31
December 2027
City of Hermosa Beach | Page 1 of 3
Meeting Date: January 13, 2026
Staff Report No. 26-CDD-002
Honorable Mayor and Members of the Hermosa Beach City Council INTRODUCE AN ORDINANCE AMENDING SUBSECTION 17.08.020 (D) OF THE
HERMOSA BEACH MUNICIPAL CODE PERTAINING TO HOME OCCUPATIONS (CITYWIDE).
CEQA: Determine the ordinance is exempt from the California Environmental Quality Act (CEQA) pursuant to section 15061(b)(3) of the CEQA Guidelines (Common Sense Exception).
(Community Development Director Alison Becker)
Recommended Action:
Staff recommends City Council:
1. Determine the ordinance is exempt from the California Environmental Quality Act (CEQA) pursuant to section 15061(b)(3) of the CEQA Guidelines (Common Sense Exception);
2. Conduct a public hearing to consider amending subsection 17.08.020 (D) of the Hermosa Beach Municipal Code pertaining to Home Occupations (Citywide); and
3. Introduce by title only and waive first reading of an Ordinance of the City of the Hermosa Beach approving Zoning Text Amenment (TA25-04) pertaining to Home Occupations (Attachment 1).
Executive Summary:
This item proposes amendments to the Hermosa Beach Municipal Code (HBMC) Section
17.08.020 (D) to simplify and expedite the business license process for home-based businesses. The amendments are intended to enhance customer service, reduce processing time, and improve consistency and transparency in the City’s business licensing practices.
The proposed changes align with the City Council’s goals of supporting local economic vitality, improving efficiency in City operations, and fostering a business-friendly environment while maintaining compliance with applicable regulations.
Background:
The City currently regulates business licensing under Hermosa Beach Municipal Code Chapter 5.04. Hermosa Beach Municipal Code Section 17.08.020 further defines the uses permitted in the R-1 Single-Family Residential Zone, including commercial uses such as home occupations. While the existing procedures for commercial businesses and home
City of Hermosa Beach | Page 2 of 3
occupations provide necessary regulatory oversight, they were developed prior to the implementation of the City’s current digital permitting systems and do not fully reflect best practices for online, streamlined, and customer-centered processes.
Staff conducted a review of the City’s business license processes in coordination with Administrative Services, Community Development, and the City Manager’s Office. The review identified several opportunities to modernize and clarify existing requirements for both commercial business and home occupation licenses.
On December 16, 2025, staff presented the proposed amendments to the Hermosa Beach Planning Commission for review and discussion, received feedback from the Commissioners, and incorporated their input into the final recommendations.
Past Council Actions
Meeting Date Description
December 9, 2025
City Council reviewed proposed amendments and directed
staff to forward the proposed amendments to the Hermosa Beach Planning Commission.
Analysis:
To modernize and streamline the City’s business licensing process, the Planning Commission recommended that City Council approve the proposed amendments to refine and clarify application requirements, ensuring consistency and transparency in documentation standards for both commercial and home-based businesses. The following updates to Section 17.08.020(D) would simplify and modernize home occupation requirements:
Proposed Amendments to HBMC Section 17.08.020 (D) – Home Occupations:
1. Update Subsection (7): Replace the reference to “Planning Department” with “Community Development Department” to reflect the current department title.
2. Update Subsection (11): Updating the title from “Planning Director” to current title, “Community Development Director.” This change will ensure our code reflects the most accurate and up-to-date organizational structure.
3. Update Subsection (12): Per Planning Commission’s recommendation, the Planning Commission review was removed and replaced with review and approval by the “Community Development Director.” This change will streamline the review process while maintaining appropriate administrative oversight and consistency with City procedures.
City of Hermosa Beach | Page 3 of 3
4. Delete Subsection (17): Remove subsection (17), which requires a physical inspection of the premises prior to permit approval. Staff inspections for home occupations are no longer necessary given the limited, low-impact nature of most home-based businesses. Removing this requirement will reduce staff workload and expedite permit issuance without compromising code compliance or public safety. Additionally, inspections of home offices are no longer common practice in neighboring jurisdictions.
Environmental Determination:
The proposed zoning text amendment is a project subject to the California Environmental Quality Act (CEQA) and qualifies for an exemption from CEQA pursuant to Section 15061(b)(3) (Common Sense Exemption) of the State CEQA Guidelines (Chapter 3 of Division 6 of Title 14 of the California Code of Regulations). The activity is covered by the Common Sense Exemption that CEQA applies only to projects which have the potential for causing a significant effect on the environment. There is no possibility that the proposed change to the zoning code may have a significant effect on the environment, therefore the activity is not subject to CEQA. No special circumstances exist that the proposed change would create a significant adverse effect on the environment (i.e. no sensitive species or habitats, no hazardous sites, no scenic highways, no historic resources, etc.).
Fiscal Impact:
There is no fiscal impact associated with the recommended actions.
Attachment:
Draft Ordinance Amending HBMC 17.08.020 (D) – Home Occupations Respectfully Submitted by: Leo Zalyan, Management Analyst Concur: Alison Becker, AICP, Community Development Director Noted for Fiscal Impact: Henry Chao, Finance Manager
Legal Review: Sarah Lockin, Interim Assistant City Attorney Approved: Steve Napolitano, City Manager
CITY OF HERMOSA BEACH
ORDINANCE NO. 26-
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF HERMOSA BEACH, CALIFORNIA, AMENDING SUBSECTION 17.08.020(D) OF THE
HERMOSA BEACH MUNICIPAL CODE RELATING TO HOME
OCCUPATIONS; AND FINDING THE ACTION TO BE EXEMPT FROM
THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
RECITALS
WHEREAS, Chapter 17.08 “R-1 Single-Family Residential Zone” to Title 17 “Zoning” of the Municipal Code (“Code”) provides development standards for single-family dwellings in the City of Hermosa Beach (“City”) to assure adequate access to schools, parks, and facilities; prohibit negative impacts from nonresidential uses; protect the residential character of neighborhoods; and encourage a high quality environment for family life; and WHEREAS, Code Section 17.08.020 defines the permitted uses in the R-1 Zone, which includes home occupations pursuant to subsection 17.08.020(D); and WHEREAS, the City desires to amend Code subsection 17.08.020(D) to update and streamline the requirements for home occupations in the R-1 Zone; and WHEREAS, the Hermosa Beach Planning Commission passed Resolution No. 25-XX recommending the adoption of the proposed Ordinance after conducting a duly noticed public hearing at its meeting on December 16, 2025, and considered all public comment and testimony.
THE CITY COUNCIL OF THE CITY OF HERMOSA BEACH, CALIFORNIA DOES HEREBY ORDAIN AS FOLLOWS:
SECTION 1. Recitals. The recitals above are true and correct, and are hereby incorporated herein by this reference.
SECTION 2. Amendment. Subsection 17.08.020(D) of the Code is hereby amended to read as follows:
a. Subsection D.7 is amended by replacing the words “planning department” with the words “Community Development Department”. b. Subsection D.11 is amended by replacing the words “planning director” with the words “Community Development Director”. c. Subsection D.12 is amended by replacing the words “planning director” with the words “Community Development Director”.
d. Subsection D.17 is deleted in its entirety.
SECTION 3. Severability. If any part of this Ordinance or its application is deemed invalid by a court of competent jurisdiction, the City Council intends that such invalidity will not affect the effectiveness of the remaining provisions or applications; and, to this end, the provisions of this Ordinance are severable.
SECTION 4. California Environmental Quality Act (“CEQA”). The City Council finds that this Ordinance is not subject to CEQA pursuant to Sections 15060(c)(2) (the activity will not result in a direct or reasonably foreseeable indirect physical change in the environment) and 15060(c)(3) (the activity is not a project as defined in Section 15378) of the CEQA Guidelines (Chapter 3 to Title 14 of the California Code of Regulations) because it has no potential for resulting in physical change to the environment, directly or indirectly.
SECTION 5. Certification. The City Clerk is directed to certify the passage and adoption of this Ordinance; cause it to be entered into the City’s book of original Ordinances; make a note of the passage and adoption in the records of this meeting; and, within fifteen (15) days after the Ordinance’s passage and adoption, cause it to be published or posted in accordance with California law.
SECTION 6. Effective Date. This Ordinance shall become effective, and be in full force and effect, from and after thirty (30) days of its final passage and adoption.
PASSED, APPROVED and ADOPTED on this 13th day of January 2026.
AYES:
NOES:
ABSTAIN:
ABSENT:
Mayor Rob Saemann
PRESIDENT of the City Council and MAYOR of the City of Hermosa Beach, CA ATTEST: APPROVED AS TO FORM:
________________________________ ________________________________ Myra Maravilla Jason Baltimore
City Clerk Interim City Attorney
ORDINANCE FOR INTRODUCTION AMENDING
SUBSECTION 17.08.020 (D) OF THE HERMOSA
BEACH MUNICIPAL CODE PERTAINING TO
HOME OCCUPATIONS (CITYWIDE).
City of Hermosa Beach
January 13, 2026 Page 590 of 1021
Background
▪ Interdepartmental review identified opportunities to
modernize and clarify Business License Application processes ▪ Business licensing regulated under HBMC Chapter 5.04 and
17.08.020
▪ Amendments to HBMC 17.08.020(D) to simplify and expedite business licensing
▪ Planning Commission reviewed/approved proposed
amendments on December 16, 2025, via Resolution #25-24
1. Update subsection (7):
❑ Changes department name to “Community Development
Department”
2. Update subsection (11):
❑ Changes title to “Community Development Director”
3. Update Subsection (12):
❑ Per Planning Commission’s recommendation, the Planning Commission review was removed and replaced with review
and approval by the “Community Development Director.”
4. Delete subsection (17):
❑ Removes requirement for physical inspections
❑ Aligns with regional best practices; reduces delays
Proposed Amendments to HBMC 17.08.020 (D)
1. Determine the Project Exempt from CEQA; and
2. Conduct a public hearing to consider amending subsection
17.08.020 (D) of the Hermosa Beach Municipal Code pertaining to Home Occupations (Citywide); and
3. Introduce by title only and waive first reading of an Ordinance of the City of the Hermosa Beach, California approving Zoning Text Amendment (TA25-04) pertaining to Home Occupations.
Next Steps
ORDINANCE FOR INTRODUCTION AMENDING
SUBSECTION 17.08.020 (D) OF THE HERMOSA
BEACH MUNICIPAL CODE PERTAINING TO
HOME OCCUPATIONS (CITYWIDE).
City of Hermosa Beach
January 13, 2026 Page 594 of 1021
City of Hermosa Beach | Page 1 of 6
Meeting Date: January 13, 2026
Staff Report No. 25-PW-086
Honorable Mayor and Members of the Hermosa Beach City Council
AWARD OF PROFESSIONAL SERVICES AGREEMENT FOR CITY YARD PROJECT OWNER’S REPRESENTATIVE SERVICES
(Public Works Director Joe SanClemente)
Recommended Action:
Staff recommends City Council:
1. Award a contract for City Yard owner’s representative services to Cumming Management Group, Inc. at a not-to-exceed amount of $565,000 for a term of four years ending January 13, 2030 (Attachment 3); and
2. Authorize the City Manager to execute and the City Clerk to attest the proposed agreement subject to approval by the City Attorney.
Executive Summary:
The Fiscal Year 2025–2026 Capital Improvement Program (CIP) includes CIP 615 New Corporate Yard Facilities to fully renovate the City Yard facility at 555 6th Street. Given the size and complexity of the Project, staff recommends to City Council retaining the services of an experienced owner’s representative (OR) to augment City staff and facilitate the advancement of the long-awaited project. The OR will act as an extension of City staff, advocate the best interests of the City; providing strategic oversight, technical guidance, and coordination support to ensure the project is delivered on time, within budget, and to the City’s quality requirements.
At its September 9, 2025 meeting, City Council directed staff to issue the Request for Qualifications (RFQ) for Owners Representative Services for the City Yard Project.
Following a competitive RFQ process, staff recommends the City Council award a Professional Services Agreement to Cumming Management Group, Inc. (Cumming Group) at a not-to-exceed amount of $565,000, and a term of four years ending January 13, 2030. OR services are intended to include all phases of the project, from pre-design through construction completion and closeout; however, the current scope of work covers only pre-construction services. Construction period services will be considered at a later date and subject to City Council approval at that time.
City of Hermosa Beach | Page 2 of 6
Background:
The Fiscal Year 2025–2026 Capital Improvement Program (CIP) includes CIP 615 New Corporate Yard Facilities intended to fully renovate the City Yard facility at 555 6th Street.
The existing facility has far exceeded its useful life and is in poor condition with a growing urgency for extensive repairs and renovation to ensure continued use and efficient service delivery.
During the 2023 and 2024 CIP Study Sessions, Council indicated a desire for staff to evaluate the potential for the project to proceed through an alternative delivery model (i.e., design-build versus the design-bid-build method) with the goal of retaining a contractor–designer team through a qualifications-based selection, potential risk transfer, and reducing overall cost and schedule uncertainty.
Staff presented a brief presentation comparing both options to City Council during the May 13, 2025, CIP Study Session meeting for initial consideration. At that meeting, Council directed staff to seek additional input from the Public Works Commission on the preferred project delivery method and then return to City Council.
At its July 16, 2025 meeting, staff provided a presentation to the Public Works Commission (Commission) comparing the two proposed project delivery methods, and the necessary steps to advance the project under either method, including the importance of retaining OR services. Commission passed a motion recommending the City Council consider proceeding with the design-bid-build (DBB) method for the City Yard Project, citing concerns about potential unknowns in the guaranteed maximum price (GMP) at time of contract award and process constraints for design development and review.
In reviewing the concerns highlighted by the Public Works Commission, staff reevaluated the necessary steps to advance the project and determined that a decision on project delivery method was not yet required and there were other critical path items necessary to advance the project under either method, including retaining the services of an experienced owner’s representative (OR), advancing the project programming, updating environmental assessments, consideration of temporary relocation of existing operations off-site (e.g., storage facility site), and continued evaluation of financing options that will need to be in place before the project can fully advance.
Staff presented the project delivery plan to City Council at its meeting on September 9, 2025, at which time City Council directed staff to proceed with the issuance of the RFQ for OR services for the City Yard Project as well as direction to proceed with the project programming and environmental assessments.
City of Hermosa Beach | Page 3 of 6
Past Commission and Council Actions
Meeting Date Description
City Council:
May 13, 2025
City Council made a motion directing staff to seek additional input from the Public Works Commission and City Council on the preferred project delivery method.
Public Works
Commission:
July 16, 2025
Public Works Commission reviewed delivery options and made a motion recommending City Council to proceed with the
traditional design-bid-build procurement method for the City Yard Project.
City Council:
September 9, 2025
City Council directed staff to proceed with issuing the Request for Qualifications for Owners Representative services for the City Yard Project; advance the environmental assessment; and commence project programming phases of the project.
Discussion:
On September 10, 2025, the City issued a Request for Qualifications (RFQ) 25-006 (Attachment 1) inviting experienced and highly qualified firms to submit a statement of qualification (SOQ) through a competitive process. The RFQ was advertised on the City’s online bidding platform, Planet Bids. On Thursday, October 9, 2025, a total of five SOQs were received in response to the RFQ.
The proposing firms are listed below in alphabetical order:
CSG Consultants, Inc.;
Cumming Management Group, Inc.;
Epicus Group;
Gillis & Panichapan Architects, Inc.; and
Griffin Structures.
The proposals were independently evaluated in detail by a staff review panel and scored based on the following weighted criteria:
Relevant Experience and Expertise (40 percent)
o The Consultant’s ability to dedicate an Owners Representative, knowledgeable of the needs of a Public Works Department, which will serve as a single point of contact for the duration of the project. o Recent experience providing similar services for other jurisdictions. o Familiarity and experience with applicable industry standards and any relevant federal, state, and local requirements.
o The depth and appropriateness of experience of individual members of the technical team as they relate to technical tasks typically called for on municipal projects.
City of Hermosa Beach | Page 4 of 6
o The team’s experience and ability to clearly communicate technical concepts and terminology with the community.
Approach and Methods (40 percent)
o Demonstration of the Consultant’s ability to be responsive to the City’s needs and provide a high level of customer service.
o Evidence of the Consultant’s ability to successfully deliver project tasks and deliverables within the identified project budget and with minimized cost overruns.
o Evidence of the Consultant’s ability to work collaboratively with other members of a multi-disciplinary team in a complex and dynamic working environment.
o Demonstration of the Consultant’s commitment to accurate and superior work products and services as detailed in the project management plan. o A well thought-out and tailored approach to as-needed work that responds to the City’s particular issues and needs.
o Incorporation of innovative and/or creative approaches for providing the services that will maximize efficient, cost-effective operations or increase performance capabilities.
Administration (20 percent)
o The extent and nature of any proposed amendments to the City’s Professional Services Agreement.
o Billing rates and ability to comply with billing requirements.
The evaluation sought firms with experience in providing OR services on similar projects for other public sector clients with a proven, responsible, and responsive contract manager to ensure timely execution of all work related to the City Yard project.
Based on a comprehensive review, and following in-person interviews with top ranked firms, staff recommends that City Council award a contract for OR services for the City Yard to the top ranked firm, Cumming Group (Attachment 2 and Attachment 3). Firms were ranked according to the weighted selection criteria described above. The rankings are as follows:
Ranking Company
1 Cumming Management Group, Inc.
2 Griffin Structures
3 Gillis & Panichapan Architects, Inc.
4 Epicus Group
5 CSG Consultants, Inc.
Cumming Group exhibited the greatest understanding of the City’s needs and demonstrated the strongest ability to provide an experienced project manager, who is a
City of Hermosa Beach | Page 5 of 6
licensed architect, along with experienced supporting staff as needed to advance the project. Cumming Group also had strong professional references and has provided similar services for numerous public agencies including LA County Public Works, Orange County Public Works, the City of Murrieta, the City of West Hollywood, and other municipal, county, state, and federal entities. The designated project manager brings direct expertise working on maintenance yard projects having experience on the Imperial Yard Relocation Study in South Gate for Los Angeles County Flood Control District, Pasadena Public Works Maintenance Yard Renovations, for the City of Pasadena, and most recently, with the City of Anaheim on their maintenance yard project. Cumming Group also has a local office in Hermosa Beach.
The intent of the OR is to assist the City from the pre-design phase of the project through construction completion and close-out; however, the current scope of work and fee is limited to pre-construction phase services only. Construction period services, and fees, would be revisited at a later date and subject to further approval by City Council. The preconstruction phase services are detailed in the scope of work (Attachment 1), which outlines work over an approximately two-year timeframe. The scope also details critical path elements in the next 3 to 6 months including, but not limited to, developing necessary scopes of work for environmental assessments, California Environmental Quality Act (CEQA) review, and initial architectural feasibility assessments and programming.
Cumming Group will be responsible for coordinating the advancement of the overall project and assisting the City with developing a clear schedule and budget, and advising the City on a project delivery method. The OR will act as an extension of City staff, advocate the best interests of the City; providing strategic oversight, technical guidance, and coordination support to ensure the project is delivered on time, within budget, and to the City’s quality requirements.
If approved by Council, OR services will commence immediately following contract execution, and written notice to proceed, with a not-to-exceed limit of $565,00 with a fouryear term ending January 30, 2030. Services would be performed on a time and materials basis with a not to exceed limit; therefore, hours not spent would not be billed. The contract currently assumes an average of approximately 135 labor hours per month over a two year period, which corresponds to slightly less than one full time equivalent (FTE).
This level of assistance is appropriate for a project of this scale and to ensure that Public Works staff has the necessary support and technical assistance to advance the project in a timely manner.
City of Hermosa Beach | Page 6 of 6
Fiscal Impact:
Funds for the Owners Representative services are budgeted in the CIP 615 Corporate Yard Project Budget.
Agreement Request
Agreement Request
Amount
FY 2025-26 Budget
Dept. Account #
Total Contract
Amount
Cumming Group $565,000 301-8615-4201 $565,000
Attachments:
1. RFQ 25-006 City Yard Project Owner’s Representative Services.
2. Cumming Group Statement of Qualifications
3. Proposed Professional Services Agreement with Cumming Group.
Respectfully Submitted by: Joe SanClemente, Public Works Director Noted for Fiscal Impact: Henry Chao, Finance Manager
Concur: Brandon Walker, Administrative Services Director Legal Review: Jason Baltimore, Interim City Attorney
Approved: Steve Napolitano, City Manager
RFQ 25-006 City of Hermosa Beach
REQUEST FOR QUALIFICATIONS (RFQ) NO. 25-006
CITY YARD PROJECT- OWNER’S REPRESENTATIVE SERVICES
IN THE CITY OF HERMOSA BEACH, CALIFORNIA
CITY OF HERMOSA BEACH
Department of Public Works
1315 Valley Drive
Hermosa Beach, CA 90254
(310) 318-0212
RFQ 25-006 City of Hermosa Beach
CITY OF HERMOSA BEACH
1315 Valley Drive, Hermosa Beach, CA 90254
Phone: (310) 318-0210, Fax: (310) 937-5015
www. Hermosabeach.gov
RFQ NUMBER: RFQ# 25-006
RFQ TITLE: CITY YARD PROJECT- OWNER’S REPRESENTATIVE SERVICES REQUESTING DEPARTMENT: Public Works – Engineering Division RELEASE DATE: September 10, 2025
DUE DATE: October 9, 2025 @ 3:00 p.m. PST
Notice is hereby given that the Department of Public Works of the City of Hermosa Beach will receive statements of qualification for:
RFQ# 25-006, CITY YARD PROJECT-OWNER’S REPRESENTATIVE SERVICES Statements of qualification must be submitted as PDF via the PlanetBids Portal (pbsystem.planetbids.com/portal/51313/portal-home) and will be received until 3:00 p.m.
PST on October 9, 2025.
Statements of qualification will not be opened at that time but will be submitted to the Public Works Department for verification and compliance with specifications and subsequent recommendation to City Council for award of a contract or rejection of the responses, as deemed appropriate. The City reserves the right to make no award.
Please direct any general inquiries regarding this RFQ to Andrew Nguyen at [email protected]. All questions regarding the content of the RFQ must be submitted on the PlanetBids Portal.
Dated: September 10, 2025
RFQ 25-006 City of Hermosa Beach
Table of Contents
1 Introduction................................................................................................................................4
1.1 Invitation for Qualifications ................................................................................................4
1.2 RFQ Timeline........................................................................................................................4
1.3 Submittal Procedures..........................................................................................................4
1.4 Protest Procedures..............................................................................................................4
1.5 Contact ...............................................................................................................................5
1.6 General RFQ Conditions .....................................................................................................5
2. Scope of Services...................................................................................................................10
2.1 City Location and Characteristics ...................................................................................10
2.2 Description.........................................................................................................................10
2.2.1 Project Descriptioin ....................................................................................................10
2.3 General Scope of Work....................................................................................................11
2.4 Relevant Plans, Policies, Programs, or Projects ..............................................................14
3. Submittal Instructions .............................................................................................................14
3.1 Format................................................................................................................................14
3.2 Content..............................................................................................................................14
3.2.1 Cover Letter................................................................................................................14
3.2.2 Firm Profile...................................................................................................................15
3.2.3 Organizational Chart .................................................................................................15
3.2.4 Bios of Key Staff...........................................................................................................15
3.2.5 Relevant Experience and References......................................................................16
3.2.7 Required Forms...........................................................................................................17
3.2.8 Rate Schedule............................................................................................................17
3.2.6 Project Management Plan........................................................................................17
4. Evaluation and Selection.......................................................................................................18
4.1 Review Process..................................................................................................................18
5. Contract Expectations ...........................................................................................................19
5.1 Contract Period.................................................................................................................19
5.2 Professional Services Agreement ....................................................................................19
5.3 Standards of Work.............................................................................................................20
5.4 Invoicing and Payment ....................................................................................................20
6. Attachments and Required Forms ........................................................................................21
6.1 Sample Profession Services Agreement .........................................................................21
6.2 Required Forms .................................................................................................................31
6.2.1 Certification of Qualifications ...................................................................................31
6.2.2 Non-Collusion Affidavit ..............................................................................................33
6.2.3 Compliance with Insurance Requirements..............................................................34
6.2.4 Acknowledgement of Professional Services Agreement........................................35
RFQ 25-006 City of Hermosa Beach
1 Introduction
1.1 Invitation for Qualifications
The City of Hermosa Beach (“City”) is seeking Statements of Qualifications from qualified individuals or firms (“Consultant”) to provide Owner’s Representative Services related to a new Public Works City Yard facility (Project) in the City of Hermosa Beach. The selected Consultant would act as the City’s agent and advisor during the life of the Project, from inception to completion. Consultants must have the expertise, experience, and resources available to perform the work described in this request for qualifications (RFQ).
1.2 RFQ Timeline
RFQ posted September 10, 2025
Deadline to submit written questions September 29, 2025 Posting of responses to questions October 2, 2025
Deadline to submit qualifications October 9, 2025
Interviews for selected firms if the City
wishes to do so
TBD
Tentative award November 17, 2025
1.3 Submittal Procedures
Respondents shall submit one copy of the statement of qualification and one copy of the rate schedule in PDF format (separate files) on the PlanetBids Portal.
No responses will be accepted after the listed date and time. The format, content, and procedures for submitting a statement of qualifications are provided in further detail in Section 3 of this RFQ.
1.4 Protest Procedures
Proposers may file a “protest” of a proposal/statement of qualification with the City’s City Manager. In order for a Proposer’s protest to be considered valid, the protest must:
A. Be filed in writing within five (5) calendar days after submittal deadline, or where the Protest relates solely to events occurring thereafter, within five (5) calendar days after the event or occurrence giving rise to the protest;
RFQ 25-006 City of Hermosa Beach
B. Clearly identify the specific irregularity or accusation; C. Clearly identify the specific City staff determination or recommendation being protested;
D. Specify in detail the grounds for protest and the facts supporting the protest; E. Include all relevant supporting documentation with the protest at time of filing; and F. Be transmitted concurrently to all other parties with a direct financial interest that may be adversely affected by the outcome of the protest. Such parties shall include all other Proposers or proposers who appear to have a reasonable prospect of receiving an award depending upon the outcome of the protest.
If the protest does not comply with each of these requirements, the City may reject the protest with or without further review.
If the protest is timely and complies with the above requirements, the City Manager, or other designated City staff member, shall review the protest, any response from the challenged Proposer(s), and all other relevant information, and will provide a written decision to the protestor.
State or Federal Funding
If the subject matter of the solicitation or project is receiving any state or federal funds which requires a protest procedure different than the procedures stated above, then that protest procedure shall control.
In the event there is any lawsuit filed against the City relating to any federally funded project, the City will provide prompt notice of that lawsuit to all agencies who participated in the funding of the project.
Mandatory Procedure
This administrative procedure and the time limits set forth herein are mandatory. Failure to comply with these mandatory procedures shall constitute a waiver of any right to pursue the protest, including filing a Government Code claim or any legal proceedings or actions.
1.5 Contact
Please direct any inquiries regarding this RFQ to Andrew Nguyen at [email protected]. All questions regarding the content of the RFQ shall be submitted directly on the PlanetBids Portal. Responses to all questions will be posted on the PlanetBids portal.
1.6 General RFQ Conditions
The following instructions and conditions apply to this RFQ:
Pre-Contractual Expenses
RFQ 25-006 City of Hermosa Beach
The City of Hermosa Beach shall not, in any event, be liable for any pre-contractual expenses incurred by any Consultant. In addition, no Consultant shall include any such expenses as part of the price proposed. Pre-contractual expenses are defined as expenses incurred by bidders in:
• Preparing a statement of qualifications in response to this RFQ. • Submitting that response to the City of Hermosa Beach. • Negotiating with the City of Hermosa Beach any matter related to this RFQ, proposal, and/or contractual agreement.
• Any other expenses incurred by the consultant prior to the date of an executed contract.
Authority to Withdraw RFQ and/or Not Award Contract
The City of Hermosa Beach reserves the right to withdraw this RFQ at any time for any reason without prior notice. Further, the City makes no representations that any agreement will be awarded to any Consultant responding to this RFQ. The City expressly reserves the right to reject any and all responses to this RFQ without indicating any reasons for such rejection(s).
The release of this RFQ does not obligate or compel the City to enter into a contract or agreement.
Authority to Revise RFQ and Request Additional Information The City reserves the rights to amend the RFQ at any time, to determine the successful respondent(s), and to reject any or all responses or their components. Should it be necessary for the City to issue addendums to this RFQ during the advertisement period, the City will post addendums to the PlanetBids Portal. It is the responsibility of all prospective respondents to check PlanetBids regularly to see whether any addenda or supplemental materials have been issued. Statements of qualifications shall acknowledge that the Consultant is aware of all addendums which have been issued and has incorporated their provisions in their response by completing the Certification of Qualifications Form.
The City reserves the right, to request additional information or clarifications from consultants where it may serve the City’s best interest.
Other Conditions
• ADDITIONAL SERVICES. The Scope of Work describes the minimum work to be accomplished. Upon final selection of the firm(s), the Scope of Work may be modified and refined during negotiations with the City. Any proposer that provides additional services can include those services in the statement of qualifications and list them as additional services.
• AUTHORIZED SIGNATURES. Every statement of qualifications must be signed by the person or persons legally authorized to bind the consultant to a contract for the execution of the work. Upon request of the City, any agent submitting a statement of qualifications on behalf of a consultant shall provide a current power of attorney certifying the agent’s authority to bind the consultant.
RFQ 25-006 City of Hermosa Beach
• AWARD OF QUALIFICATIONS. City reserves the right to negotiate final terms with the selected consultant, if any. Award may be made to the consultant offering the most advantageous statement of qualifications after consideration of all criteria. • COMPLIANCE WITH LAWS. All statement of qualifications shall comply with current federal, state, and other laws relative thereto.
• CONFLICT OF INTEREST. By signing the Certification of Qualifications, the consultant declares and warrants that no elected or appointed official, officer or employee of the City has been or shall be compensated, directly or indirectly, in connection with this statement of qualifications or any work connected with this statement of qualifications. Should any agreement be approved in connection with this Request for Qualifications, consultant declares and warrants that no elected or appointed official, officer or employee of the City, during the term of his/her service with the City shall have any direct interest in that agreement, or obtain any present, anticipated or future material benefit arising therefrom. • DISQUALIFICATION OF PROPOSER. If there is reason to believe that collusion exists among the consultants, the City may refuse to consider statement of qualifications from participants in such collusion. No person, firm, or corporation under the same or different name, shall make, file, or be interested in more than one statement of qualifications for the same work unless alternate statement of qualifications is called for. Reasonable grounds for believing that any consultant is interested in more than one statement of qualifications for the same work will cause the rejection of all statement of qualifications for the work in which a consultant is interested.
Consultants shall submit as part of their statement of qualifications documents the completed Non-Collusion Affidavit.
• EXAMINATION OF DOCUMENTS. It is the responsibility of the consultant to carefully and thoroughly examine and be familiar with these RFQ documents, general conditions, all forms, specifications, drawings, plans, and addendums (if any).
Consultants shall satisfy themselves as to the character, quantity, and quality of work to be performed and materials, labor, supervision necessary to perform the work as specified by these documents. The failure or neglect of the consultant to examine documents shall in no way relieve the consultant from any obligations with respect to the solicitation for and subsequent contract that may be awarded. The submission of a statement of qualifications shall constitute an acknowledgment upon which the City may rely that the consultant has thoroughly examined and is familiar with the RFQ documents. The failure or neglect of a consultant to receive or examine any of the documents shall in no way relieve the consultant from any obligations with respect to the statement of qualifications. No claim will be allowed for additional compensation that is based upon a lack of knowledge of any solicitation document. • INTERPRETATION OF RFQ DOCUMENTS. City reserves the right to make corrections or clarifications of the information provided in this RFQ. If any person is in doubt as to the true meaning of any part of this RFQ documents, or finds discrepancies or omissions in the document, the person may submit to the City a written request for an interpretation or correction. Oral statement(s), interpretations or clarifications concerning meaning or intent of the contents of this RFQ by any person are unauthorized and invalid. Modifications to the RFQ, including, but not limited to the scope of work, can be made only by written addendum issued by the City. Proposers
RFQ 25-006 City of Hermosa Beach
shall submit all questions in writing to the contact listed in the announcement or submitted on the PlanetBids Portal. Proposers may not contact any other staff members with questions. The requesting party is responsible for prompt delivery of any requests. When the City considers interpretations necessary, interpretations will be in the form of an addendum to the RFQ documents, and when issued, will be sent as promptly as is practical to all parties recorded by the City as having received RFQ documents. All such addenda shall become a part of the RFQ document. It is the responsibility of each consultant to ensure the City has their correct business name, mailing address and e-mail address on file through the PlanetBids online portal. Any prospective consultants who obtained a set of RFQ documents from the PlanetBids online portal are responsible for checking PlanetBids to verify if any subsequent Addendums were issued.
• IRREGULARITIES. City reserves the right to waive non-material irregularities if such would be in the best interest of the City as determined by the City Manager. • NON-DISCRIMINATION. Consultant represents and warrants that it does not and will not discriminate against any employee or applicant for employment because of race, religion, gender, color, national origin, sexual orientation, ancestry, marital status, physical condition, pregnancy or pregnancy-related condition, political affiliation or opinion, age or medical condition.
• NON-EXCLUSIVE. Should the City make an award, the successful consultant will enter into a NON-EXCLUSIVE professional services agreement and the City reserves the right to enter into agreements with other firms.
• OFFERS OF MORE THAN ONE PRICE. Consultants are NOT allowed to submit more than one rate schedule.
• OWNERSHIP. All data, documents and other products used or developed during the RFQ process become the property of the City upon submission. All documents submitted in response to this RFQ shall become the property of the City and a matter of public record pursuant to Government Code sections 6250 et seq. Statement of qualifications should not be marked as confidential or proprietary, and City may refuse to consider a statement of qualifications so marked. All information contained within the statement of qualifications will become a matter of public record. It is the responsibility of each bidder to clearly identify any and all information contained within its statement of qualifications that it considers to be confidential and/or proprietary. To the extent that the City agrees with that designation, such information will be held in confidence whenever possible. All other information will be considered public.
• PROFESSIONAL SERVICES AGREEMENT. Prior to awarding any work, the selected Consultant will be required to execute a professional services agreement (sample attached) with the City. Any proposed change to the agreement shall be identified in the response to the Request for Qualifications (RFQ) and shall be subject to the sole approval of the City. The City requires the Consultant to obtain and maintain a policy of professional liability and other insurance as indicated in the agreement. • NO PUBLIC OPENING/PUBLIC RECORDS ACT. Statement of qualifications shall be opened, and its contents secured by City staff to prevent disclosure during the
RFQ 25-006 City of Hermosa Beach
evaluative process and the process of negotiating with competing consultants.
Adequate precautions shall be taken to treat each consultant fairly and to ensure that information gleaned from competing statement of qualifications is not disclosed to other Consultants. Prices and other information concerning the statement of qualifications shall not be disclosed until a recommendation for award is made to the awarding authority.
• PUBLIC RECORD. All statement of qualifications submitted in response to this RFQ will become the property of the City upon submittal and a matter of public record when the City selects a proposer for recommendation to the City Council for its consideration pursuant to applicable law.
• REPRESENTATIONS. Consultant understands and acknowledges that the representations made in their submitted statement of qualifications are material and important, and will be relied on by the City in evaluation of the statement of qualifications. Consultant misrepresentation shall be treated as fraudulent concealment from the City of the facts relating to the statement of qualifications. • SEVERABILITY. If any provisions or portion of any provision, of this Request for Qualifications are held invalid, illegal or unenforceable, they shall be severed from the Request for Qualifications and the remaining provisions shall be valid and enforceable.
• SUBCONTRACTOR INFORMATION. If the statement of qualifications includes the use of sub consultants, consultant must identify specific sub consultants and the specific requirements of this RFQ for which each proposed sub consultant would perform services. All sub consultant for work services must follow all required provisions of the prime contract.
• VALIDITY. Statement of qualifications must be valid for a period of 90 days from the due date.
• WITHDRAWAL OF STATEMENT OF QUALIFICATIONS. Consultants’ authorized representative may withdraw statement of qualifications only by written request received by this RFQ contact personal before the Submittal Deadline. • BUSINESS LICENSE. The selected firm(s) must obtain a City of Hermosa Beach Business license and maintain a current certificate of insurance with the City for the duration of the Professional Service Agreement.
RFQ 25-006 City of Hermosa Beach
2. Scope of Services
2.1 City Location and Characteristics
The City of Hermosa Beach is located within the southwestern coastal portion of Los Angeles County in what is commonly referred to locally as the “South Bay” area. The City is bounded on the north by the City of Manhattan Beach, on the south by the City of Redondo Beach, on the east by the City of Redondo Beach and the City of Manhattan Beach, and on the west by the Pacific Ocean. The City limits for Hermosa Beach encompass a relatively small land area, approximately 1.4 square miles. Hermosa Beach is thriving, and engaged community, with some 20,000 residents and naturally draws a high number of visitors to its beaches and downtown.
Governed by a five-member City Council with members elected at large, Hermosa Beach operates under the council/city manager form of government as a general law city. Like the community, the Council is informed, educated, and engaged. The programs and services provided by the City are accomplished through seven City departments:
Administrative Services, City Clerk, City Manager, Community Development, Community Resources, Police, and Public Works.
2.2 Description
The City of Hermosa Beach, (“Owner”), is seeking statements of qualifications for Owner’s Representative (OR) services for development of a new Public Works Maintenance Facility (Project). The Project includes construction of a new facility comprised of various components including administration offices, maintenance and operations building, indoor and outdoor storge, vehicle maintenance building, outdoor parking, interim housing/temporary relocation of the current operation, and associated site work.
The construction delivery methods for the Project may include but are not limited to one or more of the following: design-bid-build, design-build, progressive design-build or publicprivate-partnership (3P).
City requires a proactive Owner’s Representative to provide comprehensive oversight and project management services throughout the life of Project ensuring that it is completed on schedule, within budget, and to the highest quality and safety standards.
2.2.1 Project Descriptioin
The Project will consist of environmental assessment, any necessary environmental remediation activities, demolition of existing buildings and facilities, programming, preliminary design, design and construction of a new public works maintenance facility through design-bid-build or alternative delivery model.
The site designated for development of the Project is a 1.38-acre parcel owned by the City of Hermosa Beach, located at 555 6th Street in Hermosa Beach, California, within Assessor’s Parcel Number 4187-031-900 and is located on the northwest corner of Valley Drive and 6th Street. The site houses the existing City’s Public Works Maintenance Yard. The City also has two other Public Works Facilities, and irrigation workshop at 530 4th Street and an electrical workshop and general storage facility at 1110 6th Street, that are in poor condition and
RFQ 25-006 City of Hermosa Beach
lead to operational inefficiencies that will need to be considered for consolidation into a new facility at the existing 555 6th Street site. The existing City Yard is also one of few locations for City materials and equipment storage and also support operational and storage needs for the City’s third-party maintenance contractors, including trash operations, landscape services, sewer cleaning, and storm drain cleaning.
The City’s existing Public Works Maintenance Yard buildings were constructed between the 1920s and the 1970s. The site is located within an area of predominantly industrial land use with an open, low-rise urban form. The site is bordered by industrial uses. A four-story multifamily building is located approximately 100 feet to the north, zoned R-3 (Multiple-Family Residential). Clark Stadium and South Park are located approximately 450 feet away from the site, both zoned Open Space. The Greenbelt is located east of the property between Valley Drive and Ardmore Avenue. Within the site's immediate vicinity, all built structures are between one and two stories in height.
City’s maintenance activities have included the use of fuel and paint thinner/waste underground storage tanks (USTs). The fuel USTs were removed, and the paint thinner/waste USTs were closed in place in 1998 and 1988, respectively. No significant subsurface impacts were identified during prior investigations of the UST areas. The site was previously used as the City dump from the 1920s until the late 1940s/early 1950s. Subsurface impacts associated with the former dump have been identified in the northern portion of the site.
The northeastern portion of the site was used as a City dump from the late 1920s until the late 1940s/early 1950s. The dump accepted municipal wastes, such as glass, porcelain, ceramic, metal, and burn ash. In the 1920s (based on a 1927 Sanborn Fire Insurance Map), refuse was burned on-site, in a small, older building located near the corner of Valley Drive and 6th Street. Waste was placed to a depth of approximately 45 feet below ground surface (bgs) in the northeast corner of the site.
The overall topography of the site is relatively flat; however, depressions and elevated areas are noted in various areas of the site. An elevated area exists in the central portion of the site. The reason for this elevated area and the depressed area to the west is not known. A large depression is present north of the old southern building. This depression appears to have been created during development and leads to a below-ground garage.
The site has an average elevation of approximately 55 feet above mean sea level (amsl).
Soils outside of the landfilled area have been classified as medium to light brown silty sand, silty coarse sand, and coarse sand (Brycon, 2013). Within the landfilled area, the soils are generally classified as dark silty sands with debris. Site Hydrogeologic Setting According to the 2013 groundwater sampling report, the semi-perched groundwater in the site vicinity is of little beneficial use because of poor quality and low yield (Brycon, 2013). Additionally, the 2013 groundwater report notes that there are no known drinking water wells in the site vicinity. Groundwater was encountered between 46 and 51 feet bgs during the 2013 groundwater investigation (Brycon, 2013). No permanent wells have been established on the site and no groundwater elevation data has been collected. However, it can be assumed that the general groundwater flow direction would be toward the west.
2.3 General Scope of Work
The following is a non-exhaustive summary of the services that are likely to be expected of the owner’s representative for the Project. The City is seeking an effective Owner’s
RFQ 25-006 City of Hermosa Beach
Representative, who is a seasoned professional, preferably a licensed architect in the State of California, with extensive experience in construction of public and private facilities and buildings, who combines technical expertise, municipal experience, and project management skills to safeguard the city’s interests from planning to occupancy of the subject project:
• Managing and overseeing the entire Project as the owner’s representative through all phases of the Project, including the planning/programming, design, construction document, bidding/negotiation/GMP, construction, and closeout phases. This entails review of financial and engineering performances. • Facilitating the determination of the Project delivery method. • Working closely with the Owner’s leadership to connect the vision, priorities and plan to all design and construction decisions, including managing, overseeing, and/or conducting such cost-benefit and total life cycle cost analyses showing the cost of owning and operating the Project facilities, as may be requested or required by Owner.
• Assisting in procuring contracts and transactional agreements required for implementation of the Project.
• Managing the selection of all consultants, including assistance in preparing requests for qualifications and request for proposals in the review of contract award recommendations.
• Managing all consultants and contractors, including architects, owner specialty consultants, construction managers, design-builders and owner supplied contractors. This includes advising on and reviewing all products from these consultants and contractors.
• Serving as liaison and managing communication on behalf of the Owner. • Managing and monitoring the Project budget.
• Reviewing and monitoring the preconstruction, construction and Project schedules. • Construction cost estimating and reviewing cost estimates prepared by the architect and contractors.
• Status reports.
• Review, track and manage all invoices received and payments and disbursement of Owner funds for the Project.
• Assist with and participate in any usual and customary presentations before any governmental or quasi-governmental agency having jurisdiction over the Project and assisting the Owner, architect and any contractor in the preparation and submittal of applications, plans and other documents to such agencies in order to obtain all permits, consents and approvals required for the Project. • Assist in the coordination of securing and bringing utilities to the Project site.
RFQ 25-006 City of Hermosa Beach
• Consulting with and providing recommendations on: site use and improvements, the selection of materials, building systems, and equipment; value engineering and value analysis; constructability; logistics; long-lead items; safety and security plans; quality control; construction feasibility; actions designed to minimize adverse effects of labor or material shortages; time requirements for procurement, installation and construction completion; and factors related to construction cost, including estimates of alternative designs or materials, budgets and possible economies of scale.
• Being on the Project site, monitoring construction, and supplementing the observations made by the architect, commissioning agent and other similar consultants.
• Managing all Owner moves including swing and permanent spaces. • Coordinating the Owner’s direct purchase of materials outside of the construction contracts.
• Participating in partnering and facilitation, including executive, contractor, closeout, intervention and facilitated guaranteed maximum price sessions. • Assisting in reviewing and negotiating guaranteed maximum price proposals and preparation of guaranteed maximum price amendments for design-build contracts. • Managing the closeout process, including walk-through meetings, punch list, operation and maintenance manuals, training and documentation. • Establishing and maintaining all Project communication, both internal to the Owner and external to all consultants, contractors and vendors. • Acting on behalf of the Owner with respect to decisions required by the Owner during the design and construction phases.
• Assisting and participating in planning, design, scheduling, estimating, preconstruction, budget, and progress meetings and other related construction meetings in order to vet the design and construction documents to meet the Owner’s requirements, including but not limited to sustainability, usability and educational goals of the Owner, and obtain and review meeting minutes. • Participating in activities related to final conformance, interpretations and acceptance of a consultant’s or contractor’s work and give approvals where appropriate or required.
• Accompanying visiting inspectors representing public or other agencies having jurisdiction over the Project.
• Reviewing on behalf of the Owner and making recommendations regarding consultant or contractor work directives and change orders, including minor substitutions of materials and equipment, and increases in any contract amounts. • Assistance in reviewing and resolving contractor claims.
RFQ 25-006 City of Hermosa Beach
• Considering and approving requests for permits for occupancy, either in whole or in part, as may be required from Owner.
• Considering and approving consultant or contractor certifications of contract completion and certifications of warranty commencement.
2.4 Relevant Plans, Policies, Programs, or Projects
Proposers should review and consider the work already completed or underway in the development of approach, budget, and schedule. The following links are provided for your convenience:
• Fiscal Year 2025-26 Capital Improvement Program,
• PLAN Hermosa, the City’s Comprehensive General Plan and Local Coastal Program, adopted 2017
3. Submittal Instructions
3.1 Format
Proposers shall submit one copy of the statement of qualifications and one copy of the rate schedule in PDF format on the PlanetBids Portal.
3.2 Content
Statement of qualifications must be concise, but with sufficient detail to allow accurate evaluation and comparative analysis. Emphasis should be concentrated on conforming to the RFQ instructions, responding to the RFQ requirements, and on providing a complete and clear description of the Consultant’s capabilities and availability. Statement of qualifications should include the sections as described in greater detail below.
Do not include marketing brochures or other promotional material not connected with this RFQ.
3.2.1 Cover Letter
Statement of qualifications must be accompanied by a short cover letter, signed by an individual authorized to bind the proposing entity to all commitments made in the submittal.
An unsigned statement of qualifications is grounds for rejection. The cover letter should include:
• Brief introduction of the firm (or team of firms);
• Contact information for the person authorized to enter into an agreement with the City;
• Contact information for the project manager that will serve as the day-to-day contact with the City. For this on-call contract, the City will expect a dedicated point person to manage all task orders; serve as the conduit of information between any
RFQ 25-006 City of Hermosa Beach
task-specific project managers and sub-consultants; and ensure overall quality and responsiveness.
• Concise statement of understanding of the scope of work; and • Acknowledgement of receipt of any addenda issued for this RFQ.
3.2.2 Firm Profile
Proposers should provide a brief profile of the prime consultant and any sub-consultants.
Information should include, but is not limited to the following information:
• Official name, address, email, and telephone number of the consultant’s primary point of contact.
• Type of business entity of consultant (corporation, company, joint venture, etc.).
Please enclose a copy of the Joint Venture Agreement if entity is a joint venture. • Federal Employer I.D. Number.
• Indication whether firm is totally or partially owned by another business organization (parent company) or individual.
• Number of years consultant has been in business under the present business name. • Number of years of experience the consultant has had in providing required, equivalent, or related services.
• Any failures or refusals to complete a contract, and explanation.
3.2.3 Organizational Chart
Proposer shall include an organizational chart that reflects titles of key staff assigned to provide services under this statement of qualifications for the prime consultant and all subconsultants. The organizational chart should clearly identify names, titles, and professional licenses/certifications.
It is the City s requirement to have the key personnel identified in the Organizational Chart remain on the team throughout the duration of the contract. After contract execution the Consultant should not substitute key personnel (contract manager and others listed by name in the statement of qualifications) or sub-consultants without prior written approval by the City.
3.2.4 Bios of Key Staff
Proposer shall include bios of key staff identified in the organizational chart for the prime consultant and all subconsultants. The bios should indicate key relevant experience on municipal projects, their areas of expertise, degrees, and any relevant professional licenses and certifications.
RFQ 25-006 City of Hermosa Beach
3.2.5 Relevant Experience and References
Proposers shall highlight their experience providing similar services for other municipal clients highlighting the following:
• The firm’s experience in reviewing engineering studies and understanding of how engineering studies are performed, and experience with construction administration.
• Experience assisting public owners with selection of and soliciting statements of qualifications and proposals from construction professionals and consultants, including an architect/engineer, construction manager-at-risk and design-builder. • The firm’s experience in reviewing, negotiating and facilitating a guaranteed maximum price, particularly in public projects.
• Prior experience in providing owner’s representative services on similar projects.
Include: (a) description of the project and the services your firm provided for the project; (b) start and completion dates for each project; and (c) name, title and telephone number of the client contact most familiar with your services on the project.
• The firm’s equipment and facilities and the location, availability and accessibility of facilities and equipment to support staff activities on the Project. • The firm’s experience in monitoring a project schedule. • The firm’s ability to evaluate programs related to building information modeling software and provide Owner with an overview of BIM.
• The record keeping, reporting, monitoring and other information management systems that the firm would propose to use for the Project. • The firm’s ability to provide estimating, value engineering, and assistance with managing budgets.
• Experience with working within the design+ bid+ build and progressive design- build project delivery models.
• The firm’s history of compliance with federal, state and local laws, rules and regulations.
• The firms experience and familiarity with the governmental and quasi- governmental entities that will have jurisdiction over the Project and their requirements. • Complete listing of any public or private construction projects for which the firm has been declared in default.
• Any services the firm proposes to perform through a subconsultant; and • Other similar information.
RFQ 25-006 City of Hermosa Beach
3.2.7 Required Forms
Consultant shall review, acknowledge and submit the following forms:
• Certification of Qualifications. Consultant is required to sign and submit the Certification of Qualifications including acknowledgement that they have received and considered any addendums issued by the City of Hermosa Beach in connection with this RFQ. (See section 6.2.1)
• Non-Collusion Affidavit. Consultant is required to sign and submit the NonCollusion Affidavit. (See section 6.2.2) • Compliance with Insurance Requirements. Consultant shall demonstrate the willingness and ability to submit proof of the required insurance coverage as set forth in the Sample Professional Services Agreement. (See section 6.2.3) • Acknowledgement of Professional Services Agreement. Consultant shall demonstrate willingness and ability to comply with the City’s Sample Professional Services Agreement and/or indicate any exceptions to the Professional Services Agreement. (See section 6.2.4)
3.2.8 Rate Schedule
Rate schedules shall be submitted through PlanetBids Portal as a separate file, labeled “Rate Schedule” and indicate the firm’s name. The rate schedule shall detail hourly billable rates for key staff members (including their names, titles, and licenses) and other team member categories for various other services offered by the Consultant and subconsultants as appropriate.
Proposer must also state whether rates are guaranteed for the term of the agreement or will be subject to future rate increases. Any proposed requests to change the adopted rates annually shall not exceed the relevant Consumer Price Index for the preceding 12- month period.
Rate schedule shall detail any other direct costs intended to be charged to the City (e.g., travel, equipment, printing/materials).
3.2.6 Project Management Plan
In this section, proposers should detail their approach to responding to requests for asneeded work, ensuring clear communication between the Consultant’s Contract Manager and the City, and oversight of task orders to ensure schedule and budget adherence and quality assurance/quality control.
No mark-ups will be allowed for direct or miscellaneous costs or subconsultant work, however an appropriate number of hours for sub-consultant oversight will be allowed.
RFQ 25-006 City of Hermosa Beach
4. Evaluation and Selection
4.1 Review Process
The City will evaluate all statements of qualifications received in accordance with the evaluation criteria. The City shall not be obligated to accept the lowest fee schedule, but the City may make award(s) in the best interest of the City after all factors are considered including, but not limited to, the demonstrated competence, experience, and professional qualifications of the Consultant. Evaluation scores will not be released until after award if one is made.
Following the review of RFQs by the City s team, the City may, if it chooses to do so, invite short-listed Consultants to be interviewed by a panel of City staff, which may include nonCity personnel at the City s discretion. Discussions may, at the City's option, be conducted with the most qualified Proposer(s). Discussions may be for the purpose of clarification to assure full understanding of, and responsiveness to the solicitation requirements. Proposers shall be accorded fair and equal treatment with respect to any opportunity for discussion and written revision of statement of qualifications. In conducting discussions, the City will not disclose information derived from statements of qualifications submitted by competing Proposers.
The City will verify references of short-listed consultants, which may include persons not listed as references, and this will help inform the City s decisions.
Task orders resulting from this contract will be negotiated and executed between the City and the selected Consultant.
4.2 Evaluation Criteria
Statements of qualifications will be evaluated based on their responses to all provisions of this RFQ. The City of Hermosa Beach will use the following criteria in its evaluation of statements of qualifications, interviews, and verifications of references. The categories will be weighted as follows.
Relevant Experience & Expertise (40%):
• The Consultant’s ability to dedicate an Owners Representative a, knowledgeable of the needs of a Public Works Department, which will serve as a single point of contact for the duration of the project.
• Recent experience providing similar services for other jurisdictions. • Familiarity and experience with applicable industry standards and any relevant federal, state, and local requirements.
RFQ 25-006 City of Hermosa Beach
• The depth and appropriateness of experience of individual members of the technical team as they relate to technical tasks typically called for on municipal projects.
• The team’s experience and ability to clearly communicate technical concepts and terminology with the community.
Approach and Methods (40%):
• Demonstration of the Consultant’s ability to be responsive to the City’s needs and provide a high level of customer service.
• Evidence of the Consultant’s ability to successfully deliver project tasks and deliverables within the identified project budget and with minimized cost overruns. • Evidence of the Consultant’s ability to work collaboratively with other members of a multi-disciplinary team in a complex and dynamic working environment. • Demonstration of the Consultant’s commitment to accurate and superior work products and services as detailed in the project management plan. • A well thought-out and tailored approach to as-needed work that responds to the City’s particular issues and needs.
• Incorporation of innovative and/or creative approaches for providing the services that will maximize efficient, cost-effective operations or increase performance capabilities.
Administration (20%):
• The extent and nature of any proposed amendments to the City’s Professional Services Agreement.
• Billing rates and ability to comply with billing requirements.
5. Contract Expectations
5.1 Contract Period
The City anticipates the contract term would begin in November 2025 and extend for a term of 3 years, with an option to extend for two additional one-year terms.
5.2 Professional Services Agreement
The selected Consultant will be expected to comply with and sign the City s Professional Services Agreement. Proposers should identify and/or indicate any exceptions to the Sample Professional Services Agreement included in Section 6.1. The City Attorney or their
RFQ 25-006 City of Hermosa Beach
designee retains the discretion to accept or reject proposed exceptions or modifications to the City s Professional Services Agreement.
5.3 Standards of Work
In case of conflicts, ambiguities, discrepancies, errors, or omissions, the Consultant shall submit the matter to the City for clarification. Any work affected by such conflicts, ambiguities, discrepancies, errors or omissions which is performed by the Consultant prior to clarification by City shall be at the Consultant's risk and expense.
5.4 Invoicing and Payment
Each invoice shall contain a progress report describing the work completed during the billing period and shall also include cost information by task: previous work billed to date, work billed during the reporting period, percentage of task completed and amount remaining.
Invoices shall be submitted monthly. The invoices shall refer to the contract number, project title, and Purchase Order (PO) number.
Each invoice shall contain a progress report describing the work completed during the billing period and the following summary information:
Contract
Amount
Total Prior
Contract Billings
Contract Work
Performed this
Period
Total Contract
Amount
Performed To
Date
Contract
Percent
Complete
Total Amount
Remaining for the
Contract
RFQ 25-006 City of Hermosa Beach
6. Attachments and Required Forms
6.1 Sample Profession Services Agreement
CONTRACT FOR PROFESSIONAL SERVICES TO
________________________________________________________________ BETWEEN THE CITY OF HERMOSA BEACH AND ___________________________ This AGREEMENT is entered into this day of , 20XX, by and between the CITY OF Hermosa Beach, a general law city a municipal corporation (“CITY”) and _, a limited liability company (“CONSULTANT”).
R E C I T A L S
A. The City desires to __________________________________________.
B. The City does not have the personnel able and/or available to perform the services required under this agreement and therefore, the City desires to contract for consulting services to accomplish this work.
C. The Consultant warrants to the City that it has the qualifications, experience and facilities to perform properly and timely the services under this Agreement.
D. The City desires to contract with the Consultant to perform the services as described in Exhibit A of this Agreement.
NOW, THEREFORE, based on the foregoing recitals, the City and the Consultant agree as follows:
CONSIDERATION AND COMPENSATION As partial consideration, CONSULTANT agrees to perform the work listed in the SCOPE OF SERVICES, attached as EXHIBIT A.
As additional consideration, CONSULTANT and CITY agree to abide by the terms and conditions contained in this Agreement.
As additional consideration, CITY agrees to pay CONSULTANT a total of $ , for CONSULTANT’s services, unless otherwise specified by written amendment to this Agreement.
No additional compensation shall be paid for any other expenses incurred, unless first approved by the City Manager or his/her designee.
CONSULTANT shall submit to CITY, by not later than the 10th day of each month, its invoice for services itemizing the fees and costs incurred during the previous
RFQ 25-006 City of Hermosa Beach
month. CITY shall pay CONSULTANT all uncontested amounts set forth in CONSULTANT’s invoice within 30 days after it is received.
SCOPE OF SERVICES. CONSULTANT will perform the services and activities set forth in the SCOPE OF SERVICE attached hereto as Exhibit A and incorporated herein by this reference.
Except as herein otherwise expressly specified to be furnished by CITY, CONSULTANT will, in a professional manner, furnish all of the labor, technical, administrative, professional and other personnel, all supplies and materials, equipment, printing, vehicles, transportation, office space, and facilities necessary or proper to perform and complete the work and provide the professional services required of CONSULTANT by this Agreement.
PAYMENTS. For CITY to pay CONSULTANT as specified by this Agreement, CONSULTANT must submit an invoice to CITY which lists the reimbursable costs, the specific tasks performed, and, for work that includes deliverables, the percentage of the task completed during the billing period in accordance with the schedule of compensation incorporated in “Exhibit A.”
TIME OF PERFORMANCE. The services of the CONSULTANT are to commence upon receipt of a notice to proceed from the CITY and shall continue until all authorized work is completed to the CITY’s reasonable satisfaction, in accordance with the schedule incorporated in “Exhibit A,” unless extended in writing by the CITY.
FAMILIARITY WITH WORK. By executing this Agreement, CONSULTANT represents that CONSULTANT has (a) thoroughly investigated and considered the scope of services to be performed; (b) carefully considered how the services should be performed; and (c) understands the facilities, difficulties, and restrictions attending performance of the services under this Agreement.
KEY PERSONNEL. CONSULTANT’s key person assigned to perform work under this Agreement is ________________. CONSULTANT shall not assign another person to be in charge of the work contemplated by this Agreement without the prior written authorization of the City.
TERM OF AGREEMENT. The term of this Agreement shall commence upon execution by both parties and shall expire on __________, 20___, unless earlier termination occurs under Section 11 of this Agreement, or this Agreement is extended in writing in advance by both parties.
CHANGES. CITY may order changes in the services within the general scope of this Agreement, consisting of additions, deletions, or other revisions, and the contract sum and the contract time will be adjusted accordingly. All such changes must be authorized in writing, executed by CONSULTANT and CITY. The cost or credit to CITY resulting from changes in the services will be determined in accordance with written agreement between the parties.
RFQ 25-006 City of Hermosa Beach
TAXPAYER IDENTIFICATION NUMBER. CONSULTANT will provide CITY with a Taxpayer Identification Number.
PERMITS AND LICENSES. CONSULTANT will obtain and maintain during the term of this Agreement all necessary permits, licenses, and certificates that may be required in connection with the performance of services under this Agreement.
TERMINATION. Except as otherwise provided, CITY may terminate this Agreement at any time with or without cause. Notice of termination shall be in writing.
CONSULTANT may terminate this Agreement. Notice will be in writing at least 30 days before the effective termination date.
In the event of such termination, the CONSULTANT shall cease services as of the date of termination, and all finished or unfinished documents, data, drawings, maps, and other materials prepared by CONSULTANT shall, at CITY’s option, become CITY’s property, and CONSULTANT will receive just and equitable compensation for any work satisfactorily completed up to the effective date of notice of termination.
Should the Agreement be terminated pursuant to this Section, CITY may procure on its own terms services similar to those terminated.
INDEMNIFICATION. To the extent permitted by law, CONSULTANT shall indemnify, and hold harmless CITY, its officers, officials, employees and volunteers from and against all liability, loss, damage, expense, cost (including without limitation reasonable attorneys fees, expert fees and all other costs and fees of litigation) of every nature to the extent caused by CONSULTANT's negligence, recklessness or willful misconduct in the performance of work hereunder or its failure to comply with any of its obligations contained in this AGREEMENT. CONSULTANT shall promptly pay any final judgment rendered against CITY (and its officers, officials, employees and volunteers) with respect to claims determined by a trier of fact to have been the result of the CONSULTANT’s negligence, recklessness or willful misconduct. CONSULTANT shall reimburse the CITY its costs of defense, including without limitation reasonable attorneys fees, expert fees and all other costs and fees of litigation to the extent such fees, costs and all other costs are determined by the court of competent jurisdiction to have been caused by the actual negligence, recklessness or willful misconduct of the Consultant. It is expressly understood and agreed that the foregoing provisions are intended to be as broad and inclusive as is permitted by the law of the State of California and will survive termination of this Agreement.
The requirements as to the types and limits of insurance coverage to be maintained by CONSULTANT as required by Section 17, and any approval of said insurance by CITY, are not intended to and will not in any manner limit or qualify the liabilities and obligations otherwise assumed by CONSULTANT pursuant to this Agreement, including, without limitation, to the provisions concerning indemnification.
RFQ 25-006 City of Hermosa Beach
ASSIGNABILITY. This Agreement is for CONSULTANT’s professional services.
CONSULTANT’s attempts to assign the benefits or burdens of this Agreement without CITY’s written approval are prohibited and will be null and void.
INDEPENDENT CONSULTANT. CITY and CONSULTANT agree that CONSULTANT will act as an independent contractor and will have control of all work and the manner in which is it performed. CONSULTANT will be free to contract for similar service to be performed for other employers while under contract with CITY. CONSULTANT is not an agent or employee of CITY and is not entitled to participate in any pension plan, insurance, bonus or similar benefits CITY provides for its employees. Any provision in this Agreement that may appear to give CITY the right to direct CONSULTANT as to the details of doing the work or to exercise a measure of control over the work means that CONSULTANT will follow the direction of the CITY as to end results of the work only.
AUDIT OF RECORDS. CONSULTANT agrees that CITY, or designee, has the right to review, obtain, and copy all records pertaining to the performance of this Agreement. CONSULTANT agrees to provide CITY, or designee, with any relevant information requested and will permit CITY, or designee, access to its premises, upon reasonable notice, during normal business hours for the purpose of interviewing employees and inspecting and copying such books, records, accounts, and other material that may be relevant to a matter under investigation for the purpose of determining compliance with this Agreement. CONSULTANT further agrees to maintain such records for a period of three (3) years following final payment under this Agreement.
CONSULTANT will keep all books, records, accounts and documents pertaining to this Agreement separate from other activities unrelated to this Agreement.
CORRECTIVE MEASURES. CONSULTANT will promptly implement any corrective measures required by CITY regarding the requirements and obligations of this Agreement. CONSULTANT will be given a reasonable amount of time as determined by the City to implement said corrective measures. Failure of CONSULTANT to implement required corrective measures shall result in immediate termination of this Agreement.
INSURANCE REQUIREMENTS.
A. The CONSULTANT, at the CONSULTANT’s own cost and expense, shall procure and maintain, for the duration of the contract, the following insurance policies:
1. Workers Compensation Insurance as required by law. The Consultant shall require all subcontractors similarly to provide such compensation insurance for their respective employees. Any notice of cancellation or non-renewal of all Workers’ Compensation policies must be received by the CITY at least thirty (30) days prior to such change. The insurer shall agree to waive all rights of subrogation against the CITY, its officers, agents, employees, and volunteers for losses arising from work performed by the CONSULTANT for City.
2. General Liability Coverage. The CONSULTANT shall maintain commercial general liability insurance in an amount of not less than two million dollars
RFQ 25-006 City of Hermosa Beach
($2,000,000) per occurrence for bodily injury, personal injury, and property damage. If a commercial general liability insurance form or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to the work to be performed under this Agreement or the general aggregate limit shall be at least twice the required occurrence limit.
3. Automobile Liability Coverage. The CONSULTANT shall maintain automobile liability insurance covering bodily injury and property damage for all activities of the CONSULTANT arising out of or in connection with the work to be performed under this Agreement, including coverage for owned, hired, and non-owned vehicles, in an amount of not less than one million dollars ($1,000,000) combined single limit for each occurrence.
4. Professional Liability Coverage. The CONSULTANT shall maintain professional errors and omissions liability insurance for protection against claims alleging negligent acts, errors, or omissions which may arise from the CONSULTANT’S operations under this Agreement, whether such operations be by the CONSULTANT or by its employees, subcontractors, or sub-consultants. The amount of this insurance shall not be less than one million dollars ($1,000,000) on a claims-made annual aggregate basis, or a combined single-limit-peroccurrence basis. When coverage is provided on a “claims made basis,” CONSULTANT will continue to renew the insurance for a period of three (3) years after this Agreement expires or is terminated. Such insurance will have the same coverage and limits as the policy that was in effect during the term of this Agreement, and will cover CONSULTANT for all claims made by CITY arising out of any errors or omissions of CONSULTANT, or its officers, employees or agents during the time this Agreement was in effect.
B. Endorsements. Each general liability, automobile liability and professional liability insurance policy shall be issued by a financially responsible insurance company or companies admitted and authorized to do business in the State of California, or which is approved in writing by City, and shall be endorsed as follows.
CONSULTANT also agrees to require all contractors, and subcontractors to do likewise.
1. “The CITY, its elected or appointed officers, officials, employees, agents, and volunteers are to be covered as additional insureds with respect to liability arising out of work performed by or on behalf of the CONSULTANT, including materials, parts, or equipment furnished in connection with such work or operations.”
2. This policy shall be considered primary insurance as respects the CITY, its elected or appointed officers, officials, employees, agents, and volunteers.
Any insurance maintained by the CITY, including any self-insured retention the CITY may have, shall be considered excess insurance only and shall not contribute with this policy.
3. This insurance shall act for each insured and additional insured as though a separate policy had been written for each, except with respect to the limits of liability of the insuring company.
RFQ 25-006 City of Hermosa Beach
4. The insurer waives all rights of subrogation against the CITY, its elected or appointed officers, officials, employees, or agents.
5. Any failure to comply with reporting provisions of the policies shall not affect coverage provided to the City, its elected or appointed officers, officials, employees, agents, or volunteers.
6. The insurance provided by this policy shall not be suspended, voided, canceled, or reduced in coverage or in limits except after thirty (30) days written notice has been received by the CITY.
C. CONSULTANT agrees to provide immediate notice to CITY of any claim or loss against CONSULTANT arising out of the work performed under this agreement. CITY assumes no obligation or liability by such notice, but has the right (but not the duty) to monitor the handling of any such claim or claims if they are likely to involve CITY.
D. Any deductibles or self-insured retentions must be declared to and approved by the CITY. At the CITY’s option, the CONSULTANT shall demonstrate financial capability for payment of such deductibles or self-insured retentions.
E. The CONSULTANT shall provide certificates of insurance with original endorsements to the CITY as evidence of the insurance coverage required herein. Certificates of such insurance shall be filed with the CITY on or before commencement of performance of this Agreement. Current certification of insurance shall be kept on file with the CITY at all times during the term of this Agreement.
F. Failure on the part of the CONSULTANT to procure or maintain required insurance shall constitute a material breach of contract under which the CITY may terminate this Agreement pursuant to Section 11 above.
G. The commercial general and automobile liability policies required by this Agreement shall allow City, as additional insured, to satisfy the self-insured retention (“SIR”) and/or deductible of the policy in lieu of the Consultant (as the named insured) should Consultant fail to pay the SIR or deductible requirements.
The amount of the SIR or deductible shall be subject to the approval of the City Attorney and the Finance Director. Consultant understands and agrees that satisfaction of this requirement is an express condition precedent to the effectiveness of this Agreement. Failure by Consultant as primary insured to pay its SIR or deductible constitutes a material breach of this Agreement. Should City pay the SIR or deductible on Consultant’s behalf upon the Consultant’s failure or refusal to do so in order to secure defense and indemnification as an additional insured under the policy, City may include such amounts as damages in any action against Consultant for breach of this Agreement in addition to any other damages incurred by City due to the breach.
USE OF OTHER CONSULTANTS. CONSULTANT must obtain CITY’s prior written approval to use any sub-consultants while performing any portion of this Agreement. Such approval must include approval of the proposed consultant and the terms of compensation.
FINAL PAYMENT ACCEPTANCE CONSTITUTES RELEASE. The acceptance by the CONSULTANT of the final payment made under this Agreement shall operate as and be a release of the CITY from all claims and liabilities for compensation to the CONSULTANT for anything done, furnished or relating to the CONSULTANT’S work or
RFQ 25-006 City of Hermosa Beach
services. Acceptance of payment shall be any negotiation of the CITY’S check or the failure to make a written extra compensation claim within ten (10) calendar days of the receipt of that check. However, approval or payment by the CITY shall not constitute, nor be deemed, a release of the responsibility and liability of the CONSULTANT, its employees, sub-consultants and agents for the accuracy and competency of the information provided and/or work performed; nor shall such approval or payment be deemed to be an assumption of such responsibility or liability by the CITY for any defect or error in the work prepared by the Consultant, its employees, sub-consultants and agents.
CORRECTIONS. In addition to the above indemnification obligations, the CONSULTANT shall correct, at its expense, all errors in the work which may be disclosed during the City’s review of the Consultant’s report or plans. Should the Consultant fail to make such correction in a reasonably timely manner, such correction shall be made by the CITY, and the cost thereof shall be charged to the CONSULTANT. In addition to all other available remedies, the City may deduct the cost of such correction from any retention amount held by the City or may withhold payment otherwise owed CONSULTANT under this Agreement up to the amount of the cost of correction.
NON-APPROPRIATION OF FUNDS. Payments to be made to CONSULTANT by CITY for services preformed within the current fiscal year are within the current fiscal budget and within an available, unexhausted fund. In the event that CITY does not appropriate sufficient funds for payment of CONSULTANT’S services beyond the current fiscal year, the Agreement shall cover payment for CONSULTANT’S services only to the conclusion of the last fiscal year in which CITY appropriates sufficient funds and shall automatically terminate at the conclusion of such fiscal year.
NOTICES. All communications to either party by the other party will be deemed made when received by such party at its respective name and address as follows:
CITY CONSULTANT
City of Hermosa Beach
1315 Valley Drive
Hermosa Beach, CA 90254
ATTN: ATTN:
Any such written communications by mail will be conclusively deemed to have been received by the addressee upon deposit thereof in the United States Mail, postage prepaid and properly addressed as noted above. In all other instances, notices will be deemed given at the time of actual delivery. Changes may be made in the names or addresses of persons to whom notices are to be given by giving notice in
RFQ 25-006 City of Hermosa Beach
the manner prescribed in this paragraph. Courtesy copies of notices may be sent via electronic mail, provided that the original notice is deposited in the U.S. mail or personally delivered as specified in this Section.
A. SOLICITATION. CONSULTANT maintains and warrants that it has not employed nor retained any company or person, other than CONSULTANT’s bona fide employee, to solicit or secure this Agreement. Further, CONSULTANT warrants that it has not paid nor has it agreed to pay any company or person, other than CONSULTANT’s bona fide employee, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Agreement. Should CONSULTANT breach or violate this warranty, CITY may rescind this Agreement without liability.
B. THIRD PARTY BENEFICIARIES. This Agreement and every provision herein is generally for the exclusive benefit of CONSULTANT and CITY and not for the benefit of any other party. There will be no incidental or other beneficiaries of any of CONSULTANT’s or CITY’s obligations under this Agreement.
C. INTERPRETATION. This Agreement was drafted in, and will be construed in accordance with the laws of the State of California, and exclusive venue for any action involving this agreement will be in Los Angeles County.
D. ENTIRE AGREEMENT. This Agreement, and its Attachments, sets forth the entire understanding of the parties. There are no other understandings, terms or other agreements expressed or implied, oral or written.
E. RULES OF CONSTRUCTION. Each Party had the opportunity to independently review this Agreement with legal counsel. Accordingly, this Agreement will be construed simply, as a whole, and in accordance with its fair meaning; it will not be interpreted strictly for or against either Party.
F. AUTHORITY/MODIFICATION. The Parties represent and warrant that all necessary action has been taken by the Parties to authorize the undersigned to execute this Agreement and to engage in the actions described herein. This Agreement may be modified by written amendment with signatures of all parties to this Agreement. CITY’s city manager, or designee, may execute any such amendment on behalf of CITY.
ACCEPTANCE OF FACSIMILE OR ELECTRONIC SIGNATURES. The Parties agree that this Contract, agreements ancillary to this Contract, and related documents to be entered into in connection with this Contract will be considered signed when the signature of a party is delivered by facsimile transmission or scanned and delivered via electronic mail. Such facsimile or electronic mail copies will be treated in all respects as having the same effect as an original signature.
FORCE MAJEURE. Should performance of this Agreement be impossible due to fire, flood, explosion, war, embargo, government action, civil or military authority, the
RFQ 25-006 City of Hermosa Beach
natural elements, or other similar causes beyond the Parties’ control, then the Agreement will immediately terminate without obligation of either party to the other.
TIME IS OF ESSENCE. Time is of the essence to comply with dates and schedules to be provided.
ATTORNEY’S FEES. The parties hereto acknowledge and agree that each will bear his or its own costs, expenses and attorneys' fees arising out of and/or connected with the negotiation, drafting and execution of the Agreement, and all matters arising out of or connected therewith except that, in the event any action is brought by any party hereto to enforce this Agreement, the prevailing party in such action shall be entitled to reasonable attorneys' fees and costs in addition to all other relief to which that party or those parties may be entitled.
STATEMENT OF EXPERIENCE. By executing this Agreement, CONSULTANT represents that it has demonstrated trustworthiness and possesses the quality, fitness and capacity to perform the Agreement in a manner satisfactory to CITY. CONSULTANT represents that its financial resources, surety and insurance experience, service experience, completion ability, personnel, current workload, experience in dealing with private consultants, and experience in dealing with public agencies all suggest that CONSULTANT is capable of performing the proposed contract and has a demonstrated capacity to deal fairly and effectively with and to satisfy a public agency.
OWNERSHIP OF DOCUMENTS. It is understood and agreed that the City shall own all documents and other work product of the Consultant, except the Consultant’s notes and workpapers, which pertain to the work performed under this Agreement. The City shall have the sole right to use such materials in its discretion and without further compensation to the Consultant, but any re-use of such documents by the City on any other project without prior written consent of the Consultant shall be at the sole risk of the City.
USE OF LOGO. The CITY grants the CONSULTANT permission to use its name, logo and/or trademark in deliverables produced by the CONSULTANT on the behalf of the CITY, such as written reports, presentation slides, press releases, social media graphics, and other public outreach materials. The CITY’s prior review of artwork and written approval is required for any use of CITY logo. CITY will provide an electronic copy of the most current logo to the CONSULTANT for use in materials. The CONSULTANT will, in turn, only use the most current logo of the CITY.
DISCLOSURE REQUIRED. (City and Consultant initials required at one of the following paragraphs)
By their respective initials next to this paragraph, City and Consultant hereby acknowledge that Consultant is a “consultant” for the purposes of the California Political Reform Act because Consultant’s duties would require him or her to make one or more of the governmental decisions set forth in Fair Political Practices Commission Regulation 18700.3(a) or otherwise serves in a staff capacity for which disclosure would otherwise be
RFQ 25-006 City of Hermosa Beach
required were Consultant employed by the City. Consultant hereby acknowledges his or her assuming-office, annual, and leaving-office financial reporting obligations under the California Political Reform Act and the City’s Conflict of Interest Code and agrees to comply with those obligations at his or her expense. Prior to consultant commencing services hereunder, the City’s Manager shall prepare and deliver to consultant a memorandum detailing the extent of Consultant’s disclosure obligations in accordance with the City’s Conflict of Interest Code.
City Initials ______
Consultant Initials ______
OR
By their initials next to this paragraph, City and Consultant hereby acknowledge that Consultant is not a “consultant” for the purpose of the California Political Reform Act because Consultant’s duties and responsibilities are not within the scope of the definition of consultant in Fair Political Practice Commission Regulation 18700.3(a) and is otherwise not serving in staff capacity in accordance with the City’s Conflict of Interest Code.
City Initials ______
Consultant Initials ______
IN WITNESS WHEREOF the parties hereto have executed this contract the day and year first hereinabove written.
CITY OF HERMOSA BEACH CONSULTANT
[MAYOR/CITY MANAGER] By: NAME/TITLE
ATTEST:
Myra Maravilla, City Clerk Taxpayer ID No.
APPROVED AS TO FORM:
, City Attorney
RFQ 25-006 City of Hermosa Beach
6.2 Required Forms
6.2.1 Certification of Qualifications
RFQ #: _________
The undersigned hereby submits its statement of qualifications and agrees to be bound by the terms and conditions of this Request for Qualifications (RFQ).
1. Proposer declares and warrants that no elected or appointed official, officer or employee of the City has been or shall be compensated, directly or indirectly, in connection with this statement of qualifications or any work connected with this statement of qualifications. Should any agreement be approved in connection with this Request for Qualifications, Proposer declares and warrants that no elected or appointed official, officer or employee of the City, during the term of his/her service with the City shall have any direct interest in that agreement, or obtain any present, anticipated or future material benefit arising therefrom.
2. By submitting the response to this request, Proposer agrees, if selected to furnish services to the City in accordance with this RFQ.
3. Proposer has carefully reviewed its statement of qualifications and understands and agrees that the City is not responsible for any errors or omissions on the part of the Proposer and that the Proposer is responsible for them.
4. It is understood and agreed that the City reserves the right to accept or reject any or all statement of qualifications and to waive any informality or irregularity in any statement of qualifications received by the City.
5. The statement of qualifications response includes all of the commentary, figures and data required by the Request for Qualifications.
6. The statement of qualifications shall be valid for 90 days from the date of submittal.
7. Proposer acknowledges that the City may issue addendums related to this RFQ and that the proposer has reviewed the following addendums which have been issued:
Addendum: _____________________________
Addendum: _____________________________
Addendum: _____________________________
Addendum: _____________________________
8. Proposer further acknowledges the provisions of any addendums issued have been incorporated into their statement of qualifications.
RFQ 25-006 City of Hermosa Beach
Signature of Authorized Representative:
____________________________________________
Printed Name and Title:
____________________________________________
RFQ 25-006 City of Hermosa Beach
6.2.2 Non-Collusion Affidavit
RFQ #: _________
The undersigned declares states and certifies that:
1. This statement of qualifications is not made in the interest of or on behalf of any undisclosed person, partnership, company, association, organization or corporation.
2. This statement of qualifications is genuine and not collusive or sham.
3. I have not directly or indirectly induced or solicited any other Proposer to put in a false or sham statement of qualifications and I have not directly or indirectly colluded, conspired, connived, or agreed with any other Proposer or anyone else to put in a sham statement of qualifications or to refrain from submitting to this RFQ.
4. I have not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the rate schedule price or to fix any overhead, profit or cost element of the rate schedule price or to secure any advantage against the City of Hermosa Beach or of anyone interested in the proposed contract.
5. All statements contained in the statement of qualifications and related documents are true.
6. I have not directly or indirectly submitted the rate schedule price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any person, corporation, partnership, company, association, organization, RFQ depository, or to any member or agent thereof, to effectuate a collusive or sham statement of qualifications.
7. I have not entered into any arrangement or agreement with any City of Hermosa Beach public officer in connection with this statement of qualifications .
8. I understand collusive bidding is a violation of State and Federal law and can result in fines, prison sentences, and civil damage awards.
Signature of Authorized Representative:
____________________________________________
Printed Name and Title:
____________________________________________
RFQ 25-006 City of Hermosa Beach
6.2.3 Compliance with Insurance Requirements
RFQ #: _________
The selected consultant will be expected to comply with the City s insurance requirements contained within this RFQ.
The undersigned declares states and certifies that:
1. Proposer agrees, acknowledges and is fully aware of the insurance requirements as specified in the Request for Qualifications.
2. If selected, proposer agrees to accept all conditions and requirements as contained therein.
Signature of Authorized Representative:
____________________________________________
Printed Name and Title:
____________________________________________
RFQ 25-006 City of Hermosa Beach
6.2.4 Acknowledgement of Professional Services Agreement RFQ #: _________
The selected consultant will be expected to comply with and sign the City s Professional Services Agreement. Proposers should identify and/or indicate any exceptions to the Sample Professional Services Agreement included in Section 6.2. The City Attorney or their designee retains the discretion to accept or reject proposed exceptions or modifications to the City s Professional Services Agreement.
1. Proposer agrees, acknowledges and is fully aware of the conditions specified in the City’s Sample Professional Services Agreement.
2. Proposer agrees to accept all conditions and requirements as contained therein with exceptions noted as follows:
______________________________________________________________________________ ______________________________________________________________________________ ______________________________________________________________________________ ______________________________________________________________________________ ______________________________________________________________________________ ______________________________________________________________________________ ________________________________________________
Signature of Authorized Representative:
____________________________________________
Printed Name and Title:
____________________________________________
City of Hermosa Beach
Civic Center, 1315 Valley Drive, Hermosa Beach, California 90254-3885 ADDENDUM No. 1
RFQ No. 25-006 City Yard Project – Owner’s Representative Services DATE: October 1, 2025
TO: ALL PROSPECTIVE PROPOSERS
Please note the questions and answers for the Request for Qualifications indicated above.
PROPOSAL SUBMITTAL: The deadline to submit qualifications HAS NOT changed. The deadline to submit qualifications is still October 9th at 3:00 PM.
1. Is there an estimate for this project?
A. No. A cost estimate for the project is to be determined during the preliminary design phase of the project.
2. Relative to the mentioned interim housing/temporary relocation of the current operation, is the prime GC contractor required to provide modular buildings to support this need?
A. Various options for continuation of the City’s public works maintenance operation including interim housing on-site or a separate site, while the subject site is being redeveloped will be evaluated during the programming and preliminary design phase. Related work will be included in the project’s scope to be completed by contractor.
3. Please confirm that the information requested in the Project Mangement Plan section (Section 6) is correct. This seems to apply to an as-needed or on-call scope, as opposed to a defined project like the City Yard? A. Replace Section 3.2.6 Project Management Plan as shown in the RFQ with the following:
3.2.6 Project Management Plan
In this section proposers should detail their approach to:
i. Providing effective oversight through the life of the project within the framework of responsibility, accountability, and transparency.
City of Hermosa Beach
Civic Center, 1315 Valley Drive, Hermosa Beach, California 90254-3885 ii. Establishing project controls and deliverables.
iii. Establishing schedules and milestones.
iv. Day-to-day project management, technical advice, documentation and communication protocols.
v. Establishing an effective QA/QC program.
4. Please clarify the desired location of the Project Management Plan section. It's listed as Section 6 in the RFP, but it is positioned after Section 8? A. Section 3.2.6 Project Management Plan should be placed before Section
3.2.7 Required Forms.
5. Does the City currently have a preferred delivery method, or will the Owner’s Rep be expected to assist in determining that method as part of the scope? A. Currently, the City has not decided on a project delivery method. The decision will be made by the City Council based on input received from the staff. The Owner’s Representative is expected to assist staff to evaluate and propose available options.
6. What is the anticipated role of the Owner’s Rep in overseeing or coordinating environmental assessment/remediation activities? Will a separate consultant already be under contract for this?
A. The Owner’s Representative will prepare RFPs/RFQs for the necessary environmental assessments, oversee the required environmental remediation by coordinating with the regulatory agencies, consultants and contractors.
7. Can the City provide an extension to the due date since the response to questions date is very close to the due date and critical information needs to be confirmed before finalizing our proposal?
A. Statement of Qualifications are due on or before 3:00 pm on October 9, 2025.
City of Hermosa Beach
Civic Center, 1315 Valley Drive, Hermosa Beach, California 90254-3885 ACKNOWLEDGEMENT OF ADDENDUM NO. 1
RFQ No. 25-006 City Yard Project – Owner’s Representative Services Complete and sign this acknowledgement form. Submit and enclose the acknowledgement in your proposal. Failure to do so may result in disqualification of your firm’s proposal.
The undersigned acknowledges receipt of Addendum No. 1 dated October 1, 2025.
ATTEST: _____________________________________
Principal: _____________________________________
Address: _____________________________________
By: _____________________________________
Title: _____________________________________
City of Hermosa Beach
Request for Qualifications
City Yard Project –
Owners Representative Services
RFQ NO. 25-006
October 9, 2025
cumming-group.com
SECTION 1: COVER LETTER 4
SECTION 2: FIRM PROFILE 10
SECTION 3: ORGANIZATIONAL CHART 14
SECTION 4: BIOS OF KEY STAFF ................................................................................................................................................................. 16 SECTION 5: RELEVANT EXPERIENCE AND REFERENCES
5.1 Reviewing Engineering Studies .......................................................................................................................................................... 28
5.2 Experience Procuring Consultant and Construction Contracts........................................................................................................ 29
5.3 Reviewing, Negotiating, and Facilitating and Guaranteed Maximum Price..................................................................................... 30
5.4 Relevant Project Experience............................................................................................................................................................... 31
5.5 Firm Facilities to Support the Project................................................................................................................................................. 44
5.6 Experience Monitoring a Project Schedule ........................................................................................................................................ 44
5.7 BIM Overview....................................................................................................................................................................................... 45
5.8 Recommend Project Management Information Systems ................................................................................................................. 45
5.9 Ability to Provide Estimating, Value Engineering, and Budget Management .................................................................................. 46
5.10 Experience Working with Design-Bid-Build and Progressive Design-Build Models......................................................................... 48
5.11 History of Compliance with Federal, State, and Local Laws and Regulations ................................................................................. 53
5.12 Familiarity with Authorities Having Jurisdiction............................................................................................................................... 53
5.13 List of Projects That the Firm Has Been Declared in Default ............................................................................................................ 53
5.14 Services by Subconsultants ................................................................................................................................................................ 53 SECTION 6: PROJECT MANAGEMENT PLAN
6.1 Providing Effective Oversight Through the Life of the Project Within the Framework of Responsibility, Accountability, and Transparency................................................................................................................................................................................ 55
6.2 Establishing Project Controls and Deliverables................................................................................................................................. 55
6.3 Establishing Schedules and Milestones ............................................................................................................................................. 57
6.4 Day-to-Day Project Management, Technical Advice, Documentation, and Communication Protocols......................................... 57
6.5 Establishing an Effective QA/QC Program.......................................................................................................................................... 65 SECTION 7: REQUIRED FORMS................................................................................................................................................................... 67 SECTION 8: RATE SCHEDULE ...................................................................................................................................................................... 74 Table of Contents
At Cumming Group, we understand the critical role that effective owner’s representation plays in the successful execution of public projects. Our approach is built on strategic oversight, proactive risk management, and a commitment to delivering projects on time and within budget. Leveraging our extensive industry experience and regional expertise, we will provide the City of Hermosa Beach with a streamlined, efficient process that ensures every phase of the project – from planning and procurement to construction and closeout – is managed with precision. Our proven methodologies mitigate risks, optimize resources, and support the successful delivery of high-quality public infrastructure projects that serve the community’s needs.
cumming-group.com Page 640 of 1021 2 City of Hermosa Beach | City Yard Project SECTION 1
Cover letter
139 Hermosa Avenue
Hermosa Beach, CA 90254
T 626-888-9411
cumming-group.com
October 9, 2025
Mr. Andrew Nguyen
City of Hermosa Beach
Public Works – Engineering Division
1315 Valley Drive
Hermosa Beach, CA 90254
Re: Request for Qualifications for the City Yard Project – Owner’s Representative Services (RFQ# 25-006) Dear Mr. Nguyen and Review Committee:
Cumming Management Group, Inc. (Cumming Group), is pleased to submit our proposal to provide Owner’s Representative Services for the City Yard Project to the City of Hermosa Beach. Cumming Group has extensive experience managing public works projects of similar sizes and complexities. Because of our comprehensive understanding of local public agency policies and procedures, we are well positioned to provide you with the specialized skills and services needed to manage the demands and high expectations for this complicated project. Cumming Group is a great fit for this work based on the following:
• Southern California Public Agency Owner’s Representative Experience. Since 1996, Cumming Group has specialized in providing value to public clients, serving as owner’s representatives to help manage multimillion-dollar projects from conception to occupancy. We have provided these services for nearly three decades for numerous public agencies including LA County Public Works, Orange County Public Works, the City of Murrieta, the City of West Hollywood, the City of Santa Monica, and many other municipal, county, state, and federal entities. With this breadth of experience, we are well-versed in responding quickly to owners’ needs and efficient in allocating our best available resources in order to complete our clients’ projects to their utmost satisfaction. • Public Works Project Expertise. The firm and our proposed staff for this project are experts at managing public works projects including the delivery of dozens of local public works yard projects, maintenance facilities, City/County offices, and large abatement and demolition projects. We know what it takes to deliver these critical public works’ facilities. First and foremost is that we listen to the staff that work in these buildings and implement their project requests and requirements to best serve the public. • Integrated Services. We can provide a range of comprehensive project- and construction management-related services in-house, including construction project management, master planning, economic development planning and administration, finance management, resident engineering, value engineering, constructability reviews, cost estimating, scheduling, labor compliance, commissioning, data analytics, energy and sustainability solutions, and project controls management. Our depth of resources ensures that we will be able to address any of the City’s needs throughout the course of the project. We have reviewed your scope of services and we are uniquely qualified to manage all services in-house. • Alternative Project Delivery Experience. More often these days, public agencies are partnering with builders to design and construct their projects and, in some cases, leveraging the private dollar to build projects that incorporate civic functions paired with private services. Cumming Group is currently managing dozens of design-build, Progressive Design-Build, CM At-Risk, and Public-Private-Partnership projects for public agencies that include government functions, urban housing components, commercial office, entertainment/recreational facilities, and healthcare services. Our project leaders have the institutional knowledge to advise the City on the delivery of these complicated projects. • This is our Community. Cumming Group has been providing Project and Construction Management services to South Bay clients since 2016 from our Hermosa Beach office location. Being in Hermosa Beach allows us to provide the City with immediate, onthe-ground support at a moment’s notice. With our proximity to the project site (less than 1/2 mile), we ensure efficient, hands-on service, and a consistent presence throughout the project.
cumming-group.com
• Our Industry Recognition. We are a trusted advisor in providing high-quality construction management services, as evidenced by our recognition as #8 in Engineering News-Record’s listing of the Top 100 Professional Services Firms, our consistent recognition by the Construction Management Association of America, and our 85% repeat business rate.
Cumming Group has reviewed the scope of work for the project and we fully understand the project requirements and we are committed to managing this project to an on time delivery and under budget targets.
We acknowledge receipt of Addendum No. 1 issued October 1, 2025.
On behalf of Cumming Group, I am pleased to present our qualifications to the City of Hermosa Beach. As Executive Vice President and Principal-in-Charge, I am authorized to represent the firm and make binding decisions in all matters relating to the RFP and our submittal, and I am the person authorized to enter into an agreement with the City. I attest that all information submitted is true and correct.
Sincerely,
Anthony Sanchez, RME, Assoc. DBIA
Executive Vice President
P: 323-855-4710 / E: [email protected]
With over 25 years of professional experience in the architecture, project management, and construction management fields, I am well prepared to lead this high-priority project for the City of Hermosa Beach. Throughout my career, I have had the privilege of working on some of the largest and most complex projects in the Southern California region, including several public works yard projects, maintenance facility projects, and mission critical facilities.
I have been at the forefront of advocating for alternative project delivery methods over the last 15 years in Southern California and I have helped public agencies establish new procedures and protocols, setup new contract documents, and deliver dozens of projects using Design-Build (D-B), Job Order Contracting (JOC), Construction Manager At-Risk (CMAR), Public-Private-Partnership (P3), and Progressive Design-Build (PDB).
I am also the Cumming Group office leader for the South Bay/Hermosa Beach office since it was established in 2016. I am a resident of nearby Palos Verdes Estates, so I can be at any of these City facilities at a moment’s notice. It is my commitment to you to be available and responsive for any critical project needs within minutes.
I look forward to working with the City on this critical public works project.
Sincerely,
Matthew Feldhaus, Architect, CCM, LEED AP
Project Manager and Day-to-Day Contact
P: 562-477-7609 / E: [email protected]
Acknowledgment of RFP Addenda
City of Hermosa Beach
Civic Center, 1315 Valley Drive, Hermosa Beach, California 90254-3885 ADDENDUM No. 1
RFQ No. 25-006 City Yard Project – Owner’s Representative Services DATE: October 1, 2025
TO: ALL PROSPECTIVE PROPOSERS
Please note the questions and answers for the Request for Qualifications indicated above.
PROPOSAL SUBMITTAL: The deadline to submit qualifications HAS NOT changed. The deadline to submit qualifications is still October 9th at 3:00 PM.
1. Is there an estimate for this project?
A. No. A cost estimate for the project is to be determined during the preliminary design phase of the project.
2. Relative to the mentioned interim housing/temporary relocation of the current operation, is the prime GC contractor required to provide modular buildings to support this need?
A. Various options for continuation of the City’s public works maintenance operation including interim housing on-site or a separate site, while the subject site is being redeveloped will be evaluated during the programming and preliminary design phase. Related work will be included in the project’s scope to be completed by contractor.
3. Please confirm that the information requested in the Project Mangement Plan section (Section 6) is correct. This seems to apply to an as-needed or on-call scope, as opposed to a defined project like the City Yard? A. Replace Section 3.2.6 Project Management Plan as shown in the RFQ with the following:
3.2.6 Project Management Plan
In this section proposers should detail their approach to:
i. Providing effective oversight through the life of the project within the framework of responsibility, accountability, and transparency. cumming-group.com Page 644 of 1021 6 City of Hermosa Beach | City Yard Project Acknowledgment of RFP Addenda, Continued
City of Hermosa Beach
Civic Center, 1315 Valley Drive, Hermosa Beach, California 90254-3885 ii. Establishing project controls and deliverables.
iii. Establishing schedules and milestones.
iv. Day-to-day project management, technical advice, documentation and communication protocols.
v. Establishing an effective QA/QC program.
4. Please clarify the desired location of the Project Management Plan section. It's listed as Section 6 in the RFP, but it is positioned after Section 8? A. Section 3.2.6 Project Management Plan should be placed before Section
3.2.7 Required Forms.
5. Does the City currently have a preferred delivery method, or will the Owner’s Rep be expected to assist in determining that method as part of the scope? A. Currently, the City has not decided on a project delivery method. The decision will be made by the City Council based on input received from the staff. The Owner’s Representative is expected to assist staff to evaluate and propose available options.
6. What is the anticipated role of the Owner’s Rep in overseeing or coordinating environmental assessment/remediation activities? Will a separate consultant already be under contract for this?
A. The Owner’s Representative will prepare RFPs/RFQs for the necessary environmental assessments, oversee the required environmental remediation by coordinating with the regulatory agencies, consultants and contractors.
7. Can the City provide an extension to the due date since the response to questions date is very close to the due date and critical information needs to be confirmed before finalizing our proposal?
A. Statement of Qualifications are due on or before 3:00 pm on October 9, 2025.
cumming-group.com Page 645 of 1021 7 City of Hermosa Beach | City Yard Project Acknowledgment of RFP Addenda, Continued
City of Hermosa Beach
Civic Center, 1315 Valley Drive, Hermosa Beach, California 90254-3885 ACKNOWLEDGEMENT OF ADDENDUM NO. 1
RFQ No. 25-006 City Yard Project – Owner’s Representative Services Complete and sign this acknowledgement form. Submit and enclose the acknowledgement in your proposal. Failure to do so may result in disqualification of your firm’s proposal.
The undersigned acknowledges receipt of Addendum No. 1 dated October 1, 2025.
ATTEST: _____________________________________
Principal: _____________________________________
Address: _____________________________________
By: _____________________________________
Title: _____________________________________
Cumming Management Group, Inc.
139 Hermosa Avenue, Hermosa Beach, CA 90254
Anthony Sanchez
Executive Vice President
cumming-group.com Page 646 of 1021 8 City of Hermosa Beach | City Yard Project SECTION 2
firm profile
Proposers should provide a brief profile of the prime consultant and any sub-consultants. Information should include, but is not limited to the following information:
Cumming Group Overview
Established in California in 1996 as a project and cost management company, Cumming Group has evolved into
a multifaceted consulting firm with a determined focus on providing services that add value at every step of a project. Over the last 29 years, we have grown our presence to 60+ offices worldwide – including 12 offices in California – and now employ more than 2,700 team members.
Cumming Group has a very strong and established presence in Los Angeles and Southern California, with more than 375 team members and five office locations in the region. Our local staff includes full-time program and project managers, cost managers, and quantity surveyors, as well as specialists in labor compliance, program and project controls, scheduling, energy services, and dispute resolution and avoidance.
Our South Bay/Hermosa Beach office will service this
project. We are very local – about a 10-minute walk from our offices to the main project site at 555 6th Street, and within a few minutes from the other two project locations at 1110 6th Street and 530 4th Street.
Cumming Group, which was founded in Southern California, completes more projects in the Los Angeles area than in any other geographic area or region. Because of our long presence here, we have a keen and nuanced understanding of the
local construction community and have developed close and long-standing ties with numerous architects, contractors, suppliers, small businesses and other disadvantaged business enterprises, regulatory agencies, community advocacy groups, and more.
Public Sector Experience
From its inception, Cumming Group has specialized in public and civic projects. We have supported dozens of California municipalities and public agencies on work ranging from smaller capital maintenance projects to multibillion-dollar building programs, providing us with an unmatched level of experience in the state.
Our project experience includes management of more
than 10,000 assignments in support of owners, architects, engineers, and others. This includes more than 1,000 projects for cities and counties, covering public housing, fire and police facilities, city halls, civic centers, libraries, port or harbor facilities, offices, community centers, parks, animal shelters, maintenance facilities, roadway improvements, infrastructure improvement projects, and traffic signal improvements
among others. Our experience includes everything from
new construction and renovations to tenant improvements, feasibility studies, and site assessments.
Exclusively Representing Owners
One key characteristic that differentiates Cumming Group from other construction industry service providers is our unwavering commitment to exclusively representing owners. Many of our competitors design or build facilities while also attempting to represent owners fairly and objectively. True advocacy is not always possible when the owner’s interests are not primary.
Cumming Group engages in services exclusive to construction and project management serving as an Owner’s advocate and sole representative and does not engage in competing business interests such as real estate transactions, facility management, architectural design, or general contracting.
CALIFORNIA CITY AND COUNTY CLIENTS IN THE PAST FIVE YEARS City of Anaheim City of Mountain View City of West Hollywood City of Berkeley City of Murrieta Contra Costa County
City of Calabasas City of Oakley County of Imperial
City of Capitola City of Oxnard County of Los Angeles
City of Carlsbad City of Palo Alto County of Marin
City of Chico City of Pomona County of Orange
City of Coranado City of Port Hueneme County of Placer
City of Cupertino City of Santa Ana County of Riverside City of Goleta City of Santa Barbara County of San Bernardino City of Hanford City of Santa Cruz County of San Diego
City of Irvine City of Scotts Valley County of San Luis Obispo City of Long Beach City of South San Francisco County of San Mateo City of Los Altos City of Stinson Beach County of Santa Barbara City of Lynwood City of Thousand Oaks County of Santa Clara City of Menifee City of Torrance County of Sonoma
City of Menlo Park City of Union City Stanislaus County cumming-group.com Page 648 of 1021 10 City of Hermosa Beach | City Yard Project Services Provided
Cumming Group has reviewed the Project Scope and Specifications identified in the RFP that outlines the Scope of Work and we are confident these services all align with our core services. These are the same services that we have delivered in the past and are currently providing to local Cities and Counties.
PLANNING DESIGN CONSTRUCTION CLOSE-OUT / POSTCONSTRUCTION Program, Project
+ Construction
Management
• Project scope
development
• Feasibility studies
• Entitlements
• Project delivery
consulting
• Consultant procurement
• Design criteria
development
• Design management
• Sustainability consulting
• Constructability reviews
• Value analysis
• Risk management
• Bid facilitation
• Change management
• Quality assurance
• Contract administration
• QA/QC status meetings
• Schedule management
• FF&E coordination
• Punchlist facilitation
• Move management
• Lessons learned
• Expert testimony
Schedule Management
• Master scheduling/
budgeting
• Schedule scenarios
• Phasing + logistics
• Project cost-loading
• Risk analysis (QRA)
• 4D + 5D modeling
• Design + construction
scheduling
• Earned value + monitoring
• Schedule risk mitigation
• Resource analysis +
schedule controls / Div 1
• Audit
• Expert testimony
• Commissioning
management
Cost Management +
Estimating
• Market studies
• Feasibility analysis
• Target cost modeling
• Contingency analysis
• Life cycle cost analysis
• Sustainability cost
analysis
• Quantity takeoffs
• Milestone estimating
• Value engineering
• Risk analysis (QRA)
• Bid review
• GMP negotiation
• Continuous cost
management
• Change order reviews
• Payment application
reviews
• Project monitoring /
lender services
• Final change order
approvals
• Final payment reviews
• Benchmarking
• Asset tagging
• Project + cost auditing
Program + Project
Controls
• Controls systems design
• Controls systems
integration
• Processes + procedures
• Budget forecasting
• Team communications
• Design status reporting
• Budget monitoring
• Milestone scheduling
• Cash flow monitoring
• Cash flow reporting
• Earned value reporting
• Document controls
• Cost controls
• Schedule controls
• Close-out reporting
• Document archiving
• Financial close-out
Energy + Sustainability
Services
• Benchmarking
• Energy audits
• Renewable energy
(Solar PV)
• Sustainability master
planning
• Electric vehicle (EV)
planning
• Climate action plans
• Design review (energy
codes)
• Life cycle cost analysis
• Third-party financing
• Revolving green funds
• Commissioning plan
• Building certification
• LEED certification (or
other standard)
• Utility incentives + rebates
• Commissioning
• Retro commissioning
• GHG reporting
• Operations + maintenance
GPRO training
• Environmental
management systems
(ISO 14001)
Procurement + Contracts
Services
• Value planning
• Procurement Strategy
and advice
• Risk Management
• Market Intelligence
• Procurement Report and
Recommendation
• Prepare Design
Consultant/Construction
Manager/GC RFQs & RFPs
• Facilitate work sessions/
scorecards
• Proposal & bid analysis/
firm recommendation
• Contract negotiations
• Contract finalization &
execution
• Claims entitlement /
management
• Change order review /
processing
• Draft amendments to
contracts
• Contracts Support
• Dispute Resolution
• Lessons learned
• Develop templates &
management plans
training
• Contract risk reviews
• Contracts training /
ongoing support
cumming-group.com Page 649 of 1021 11 City of Hermosa Beach | City Yard Project Official name, address, email, and telephone number of the consultant’s primary point of contact.
Cumming Group Primary Contact
Matthew Feldhaus
139 Hermosa Ave, Hermosa Beach, CA 90254
Email: [email protected]
Cell: 562-477-7609
Type of business entity of consultant (corporation, company, joint venture, etc.). Please enclose a copy of the Joint Venture Agreement if entity is a joint venture.
Type of Business Entity
Cumming Management Group, Inc. (“Cumming Group”) is a
C Corporation
Federal Employer I.D. Number.
Federal Employee ID Number
20-8782096
Indication whether firm is totally or partially owned by another business organization (parent company) or individual.
Firm Ownership
Cumming Group is a privately held corporation, 100% owned by Cumming Holding Group, Inc.
Number of years consultant has been in business under the present business name.
Years Under Present Name
Cumming Group has been operating under the name Cumming Management Group, Inc., since 2019. From 2007 to 2019, the company was known as Cumming Construction Management,
and from 1996 to 2007 as Cumming, LLC.
Number of years of experience the consultant has had in providing required, equivalent, or related services.
Years of Experience
Cumming Group has been providing project management,
construction management, and related services for 29 years.
Any failures or refusals to complete a contract, and explanation.
Failure to Complete Contracts
Cumming Group has never had a contract terminated for cause.
Cumming Group is the 2025 Engineering News
Record (ENR) #8 Professional PMCM Services
firm and the #1 Pure-Play Professional PMCM
Services firm in the United States.
cumming-group.com Page 650 of 1021 12 City of Hermosa Beach | City Yard Project SECTION 3
organizational chart
Proposer shall include an organizational chart that reflects titles of key staff assigned to provide services under this statement of qualifications for the prime consultant and all subconsultants. The organizational chart should clearly identify names, titles, and professional licenses/ certifications.
It is the City’s requirement to have the key personnel identified in the Organizational Chart remain on the team throughout the duration of the contract. After contract execution the Consultant should not substitute key personnel (contract manager and others listed by name in the statement of qualifications) or sub-consultants without prior written approval by the City.
Cumming Group has assembled a team of seasoned professionals to serve as the City’s Owner’s Representative. With decades of combined experience overseeing billions of dollars in public sector projects across Southern California, our team has the expertise and insight required to drive successful outcomes.
We do not anticipate the need to augment our team with specialized services from any outside consultants. If the scope of work changes and specialty services are requested, we partner with many qualified subconsultant firms that could be presented to the City for consideration and approval.
The organizational chart below outlines the roles of each proposed team member. Detailed Bios/Resumes for staff can be found in Section 4 – Bios of Key Staff.
KEY STAFF
ANTHONY SANCHEZ,
RME, ASSOC. DBIA
Principal-in-Charge
MATTHEW FELDHAUS,
ARCHITECT, CCM, LEED AP
Project Manager(
NOAH HAMOUCHE,
EIT, ENV-SP
Assistant Project Manager /
Construction Manager
JUNE PENA
Move Manager
KUNAL SHAH,
LEED AP BD+C
Scheduler
YUTING BAO
Cost Estimator
MARK WALTER,
CBCP, EBCP
Commissioning Agent
EILEEN TA
Labor Compliance
SUPPORT SERVICES
SECTION 3
organizational chart
cumming-group.com Page 652 of 1021 14 City of Hermosa Beach | City Yard Project SECTION 4
Bios of Key Staff
Proposer shall include bios of key staff identified in the organizational chart for the prime consultant and all subconsultants. The bios should indicate key relevant experience on municipal projects, their areas of expertise, degrees, and any relevant professional licenses and certifications.
Our team consists of skilled professionals specializing in managing complex projects from inception to completion, ensuring timely, budget-conscious delivery with the highest quality standards. Our team offers a diverse set of qualifications in project management, with expertise in project oversight, design management, construction management, cost control, scheduling, and contract administration.
Each member has substantial experience managing public works projects, facilitating coordination with stakeholders, and ensuring compliance with all regulatory and safety requirements. We excel in handling large-scale, multi-phase initiatives, proactively addressing challenges and maintaining seamless communication throughout all stages of development, from planning to completion.
Key Staff
The following key staff are proposed for this project because of their expertise at delivering public works projects with a focus on collaborative delivery methods like Design-Build, CM At-Risk, Public-Private-Partnership, and Progressive Design-Build.
Anthony Sanchez
Principal-in-Charge
Years of Public Agency Experience: 31 years
Background: Anthony leads Cumming Group’s program, project, and construction management, including schedule, cost, and contract administration for largescale public works programs. As Executive Vice President at Cumming Group, he oversees major capital improvement programs and projects across California, directing a public works and education portfolio valued at over $7B for government agencies.
Education: Construction Management, Rancho Santiago College Certificate/License: CA General Building Contractor (B-956988); Associate DBIA Matthew Feldhaus
Project Manager
CITY’S MAIN POINT
OF CONTACT
Years of Public Agency Experience: 25 years
Background: Matthew is an expert in managing and coordinating diverse projects, excelling in design, construction, and project administration. He has managed projects from $5M to large-scale billion-dollar programs, and has served on the Board of Directors for the Construction Management Association of America (CMAA) Southern California Chapter since 2010.
Education: M.Arch, University of Southern California; B.A., Architecture, Lehigh University
Certificate/License: CA Architect (C-33265); Certified Construction Manager (CCM); LEED AP
Noah Hamouche
Assistant Project Manager /
Construction Manager
Years of Public Agency Experience: 10 Years
Background: Noah is a highly focused Assistant Project Manager / Construction Manager with expertise in construction management, project management, and public agency capital project management. He has proven to be diligent and detail-oriented, consistently delivering high-quality results, while adhering to project timelines and budgets. His last three years he has been working for the U.S. Veterans Administration as a Project Manager at the West LA campus to provide supportive housing and campus-wide infrastructure improvements.
Education: M.S., Civil Engineering, CSU Long Beach; B.S., Civil Engineering, CSU Long Beach
Certificate/License: Engineer-in-Training (CA #173619); Envision Sustainability Professional (ENV-SP); OSHA 30-Hour Certification
SECTION 4
bios of key staff
cumming-group.com Page 654 of 1021 16 City of Hermosa Beach | City Yard Project Support Services
Cumming Group has proposed a robust, but right-sized support team for this project that will assist the delivery team on an asneeded basis. In addition to our Project Management and Construction Management expertise, we are a premier project controls firm with the largest group of Cost Controls and Schedule Controls professionals of any PMCM firm in North America. Our Support team for this project includes:
Kunal Shah, leed ap bd+c
Scheduler
Kunal brings over 22 years of experience in program management, project management, and program controls. He specializes in forensic scheduling, cost management, risk analysis, and has successfully delivered large-scale, multimillion-dollar projects using various delivery methods across California.
Yuting Bao
Cost Estimator
Yuting has over 12 years of experience in the construction industry, specializing in cost management consulting. Yuting applies her expertise in cost estimating to support all phases of construction, from pre-construction through postconstruction. Her services include cost planning, milestone estimating, bid reconciliation, change order review, and pricing validation.
Eileen Ta
Labor Compliance
Eileen is an experienced labor relations professional with 15 years of expertise in the implementation, administration, and enforcement of Project Labor Agreements/Collective Bargaining Agreements, Small and Disadvantaged Business Enterprise Programs, National and Local Targeted Hiring Initiative Programs, Labor Compliance Programs, California Labor Code, Federal DavisBacon and Related Acts, and other applicable regulatory requirements and directives for various multi-million projects.
Mark Walter, cbcp, ebcp
Commissioning Agent
Mark brings 30 years of commissioning experience in ensuring building systems operate efficiently and meet performance requirements. His extensive background spans across HVAC, electrical, plumbing, and life safety systems, with a strong focus on energy efficiency, sustainability, and compliance. Mark has successfully led commissioning efforts for a wide range of projects, including public sector, commercial, and institutional buildings.
June Pena
Move Manager
June brings 11 years of experience and will be responsible for coordinating all aspects of moving operations within each facility, such as planning the relocation of equipment, furniture, and personnel.
cumming-group.com Page 655 of 1021 17 City of Hermosa Beach | City Yard Project Anthony Sanchez, RME, ASSOC. DBIA
Principal-in-Charge
Anthony represents Cumming Group as the Executive Vice President responsible for its national public project management division. He is responsible for the management of major capital improvement programs and projects throughout California while serving as Principal-in-Charge and Project Executive for various public entities/government agencies, K-14 school districts, community colleges, and higher education teams. In this role, Anthony oversees Cumming Group’s public works and education portfolio that exceeds $10 billion dollars of public construction.
With more than 30 years of experience within the construction industry, Anthony has been involved with the construction, project, and program management, design management, schedule and cost management, contract administration, and stakeholder engagement for multimillion and billion-dollar programs and projects throughout all phases of construction.
REPRESENTATIVE EXPERIENCE
Executive Vice President, Cumming Management Group, Inc.
Anthony serves as Cumming Group’s Project Executive and Principal-in-Charge for multimillion and billion-dollar programs and projects for public entities.
Responsibilities include the management, oversight, and successful execution of large and complex construction programs and projects for clients such as:. • City of Anaheim
• City of Arcadia
• City of Buena Park
• City of Burbank
• City of Carlsbad
• City of Chula Vista
• City of Coronado
• City of El Monte
• City of Garden Grove
• City of Glendale
• City of Irvine
• City of Long Beach
• City of Los Angeles
• City of Oxnard
• City of Pomona
• City of Port Hueneme
• City of Santa Monica
• City of Thousand Oaks
• County of Imperial
• County of Los Angeles
• County of Orange
• County of Riverside
• County of San Bernardino
• County of Santa Barbara
• Judicial Council of California
• Los Angeles County Development
Authority
• Orange County Public Works
• Orange County Sheriff’s Department
• Riverside County Sheriff’s Department
• Watershed Conservation Authority
EDUCATION
• Construction Management, Rancho
Santiago College
REGISTRATIONS / CERTIFICATIONS
• General Building Contractor (B),
CSLB #956988
• Associate DBIA, Design Build Institute
of America
• OSHA-10
YEARS OF EXPERIENCE
30+
cumming-group.com Page 656 of 1021 18 City of Hermosa Beach | City Yard Project Matthew Feldhaus, ARCHITECT, CCM, LEED AP
Project Manager
With over 25 years of experience, Matthew has a strong background in leading, managing, and coordinating a diverse range of projects and programs. His expertise spans design and technical disciplines, and his keen attention to detail allows him to excel in team leadership, project management, design management, construction management, and project administration. Matthew’s versatility is evident in his ability to manage projects ranging from $5 million to large-scale, billion-dollar programs.
He is also actively involved in the Construction Management Association of America (CMAA) Southern California Chapter, serving on the Board of Directors since 2010.
REPRESENTATIVE EXPERIENCE
Imperial Yard Relocation Study – South Gate, CA
As Senior Project Manager, worked with the Los Angeles County Flood Control District and Public Works to develop a conceptual plan for the replacement and relocation of the Los Angeles County Flood Control District facilities at the southern portion of Imperial Yard in South Gate, CA to allow for the construction of the Southeast Los Angeles (SELA) Cultural Center. Worked with the Flood Control District to identify available maintenance yard relocation sites to effectively replace services at the existing yard. Provided research and evaluation of potential sites as well as programming, space planning, and community outreach.
Pasadena Public Works Maintenance Yard Renovations – Pasadena, CA As Senior Project Manager, managed demolition and tenant improvement projects to the existing maintenance building at the City of Pasadena Public Works maintenance yard. Areas included office spaces, locker rooms, restrooms, break areas, and storage facilities. Services included design management, bid management and bid analysis, construction management oversight and project closeout. Project was completed 30% below budget targets.
Rancho Los Amigos Master Plan – Downey, CA
Senior Project Manager for the master planning, redevelopment, and construction of the Rancho Los Amigos campus in Downey, CA. The project consists of 13 development sites at an existing 200+ acre Los Angeles County owned urban campus.
The development plan consists of 5 million square feet of medical, county office, commercial office, retail, restaurant, hotel, and parking, and all new infrastructure to support the redevelopment. The project costs are estimated at $2.7 billion.
Matthew also managed the full remediation and removal of 105 structures across 70+ acres, along with stabilization efforts for 2 historic buildings and recycling of over 1,200 pallets of bricks. The project required the development of dozens of Procedure 5 work plans, which underwent rigorous review by the South Coast Air Quality Management District. All structures underwent thorough remediation and were subsequently demolished.
The demolition of the South Campus was undertaken due to severe blight and public safety issues. The campus had been abandoned for 20+ years and was the constant target for vandalism, theft, and arson.
3965 Vermont Ave Building Evaluation and Feasibility Study – Los Angeles, CA AS Senior Project Manager, Matthew led a team of evaluators to analyze the existing building at 3965 South Vermont Ave for the Probation Department. The scope of the evaluation included architectural, structural, ADA evaluation, building code analysis, mechanical, electrical, plumbing, waterproofing, low voltage, and conveyance
EDUCATION
• Master of Architecture, University of
Southern California
• B.A., Architecture, Lehigh University
REGISTRATIONS / CERTIFICATIONS
• California Architect C33265, California
Architects Board, 2011
• Certified Construction Manager (CCM)
• LEED Accredited Professional (LEED
AP), U.S. Green Building Council
AFFILIATIONS
• CMAA Southern California Chapter
Foundation Chair
• CMAA Southern California Chapter
President
AWARDS/HONORS
• Top 20 Under 40, Engineering News
Record (ENR), 2015
• CMAA Southern California President’s
Award, Outstanding Volunteer of
the Year, CMAA Southern California
Chapter, 2014
• CMAA National Chairman’s Award,
Contributor of the Year, CMAA Southern
California Chapter, 2013
YEARS OF EXPERIENCE
25+
cumming-group.com Page 657 of 1021 19 City of Hermosa Beach | City Yard Project systems. Following the building analysis, Matthew oversaw space planning and programming in conjunction with the County CEO and Probation Department to ensure the proposed program fit within the existing building footprint. Project scope also included management of the construction cost estimate, project delivery schedule, and Total Project Cost Estimate for the project.
Southern Youth Correctional Reception Center and Clinic (SYCRCC) Evaluation – Norwalk, CA
As Senior Project Manager, led a team in evaluating the 32-acre former youth correctional facility for potential reuse by the Los Angeles County Probation Department. The study assessed 31 existing buildings, site infrastructure, and overall suitability for conversion into a County training and administrative campus. Scope included condition assessments, rehabilitation recommendations, and preparation of cost estimates and redevelopment options. The team was selected in October 2025 by the City of Norwalk to mange the demolition and redevelopment of this project site.
Arch Street Rail Yards, Long Island Railroad – New York, NY Project Manager for the $77M train maintenance facility designed to be used for delivery, testing, acceptance, cleaning, and general maintenance of train cars prior to placing the vehicles into service. The Arch Street Project was part of a much larger $6.3B East Side Access project, a joint venture between the MTA and Long Island Railroad that would bring train service into downtown Manhattan from Long Island. cumming-group.com Page 658 of 1021 20 City of Hermosa Beach | City Yard Project Noah Hamouche, EIT, ENV-SP
Assistant Project Manager / Construction Manager
Noah is a highly focused Civil Engineer with expertise in construction management, project management, and public agency capital project management. He is actively pursuing his PE and CCM certifications. He exhibits excellent communication skills and he is accustomed to working in both teams and individually. He has proven to be diligent and detail-oriented, consistently delivering high-quality results, while adhering to project timelines and budgets. His dedication to safety, strong teamwork, and expertise in managing construction processes has resulted in a consistent reduction in project completion time.
REPRESENTATIVE EXPERIENCE
US Department of Veterans Affairs, Office of Asset Enterprise Management – Los Angeles, CA
Served as Project Manager for $10M–$40M Enhanced Use Lease capital, infrastructure, and housing projects at the West LA VA Campus. Directed planning, construction, inspections, and closeout for roadway, utility, residential, and facility projects while reviewing RFIs, submittals, and change orders to ensure compliance with VA standards, specifications, and budgets. Coordinated with utility providers and developers, delivering constructability reviews and cost analyses that saved the VA millions of dollars. Reported construction progress to leadership and monitored schedules to identify risks and mitigate delays.
U.S. Department of Veterans Affairs, Office of Asset Enterprise Management – Los Angeles, CA
Served as Sr. Project Engineer overseeing $10M–$40M Enhanced Use Lease and infrastructure projects at the West LA VA Campus, delivering permanent supportive housing for homeless veterans. Supervised a team of construction managers, monitored performance, and directed activities including schedule analysis, utility coordination, traffic control, and risk mitigation. Conducted daily site supervision to ensure OSHA compliance, tracked milestones, and reviewed RFIs, submittals, and change orders for adherence to contract documents. Managed project planning from pre-construction through closeout while facilitating document control, payment reviews, and as-built coordination, and presented legislative recommendations for inspections, ADA compliance, and campus protocols.
Port of Long Beach and Port of LA – Long Beach,CA
Worked as Transportation Engineer on roadway and highway projects in coordination with Caltrans, providing cost estimates, planning transit improvements, and managing utility relocations. Led planning and implementation of Tesla EV supercharging stations and performed construction management to ensure compliance with plans, schedules, and budgets. Developed and analyzed schedules in Microsoft Project, reviewed RFIs from contractors and agencies, and facilitated payment applications.
Partnered with port authorities to prepare financing strategies and white papers recommending long-term infrastructure and emissions-reduction initiatives.
Various Projects and Clients – Laguna Beach, CA
Served as Project Engineer preparing site civil development plans for private developers and public agencies, including grading, drainage, erosion control, and water quality management. Analyzed survey and geologic data to guide design, and performed construction inspections to ensure compliance with codes, safety standards, and specifications. Reviewed RFIs, prepared responses, and conducted structural inspections of damaged properties, producing reports with repair recommendations and cost estimates.
EDUCATION
• M.S., Civil Engineering, California State
University, Long Beach
• B.S., Civil Engineering, California State
University, Long Beach
REGISTRATIONS / CERTIFICATIONS
• Engineer-in-Training (CA #173619)
expected to complete his Professional
Engineer license by December 2025
• Envision Sustainability Professional
(ENV-SP)
• OSHA-30 Hour Certification
YEARS OF EXPERIENCE
10 cumming-group.com Page 659 of 1021 21 City of Hermosa Beach | City Yard Project Kunal Shah, EIT, LEED AP
Scheduler
Kunal is a seasoned construction management professional with over 22 years of construction experience in program management, project management, and program controls. Kunal’s extensive experience includes forensic scheduling analysis, critical path analysis, time impact analysis, recovery schedules, cost and resource loaded schedules. Having served in management roles on large-scale, complex multi-million and billion-dollar construction programs throughout California, Kunal has successfully delivered these types of projects using a variety of project delivery methods. In addition to scheduling and controls, Kunal is highly proficient in programming, design management, construction management, cost management, estimating, contract administration, risk analysis, and change order negotiation.
REPRESENTATIVE EXPERIENCE
Carson Joint Water Pollution Control
Plant, City of Carson – Carson, CA
Scheduler. Responsible for providing
general contractor services for
construction of new water pollution
control plant worth $60M. Responsible
for assembling engineering information
and work packages, procuring parts for
work operations and monitoring material
delivery. Also responsible for schedule
updates; recording daily costs; ensuring
proper inspection and document
activities; reviewing daily timecards;
keeping accurate quantity books; and
procuring and monitoring long-lead
items.
ADDITIONAL EXPERIENCE
Measure K and E Bond Programs, Long
Beach Unified School District –
Long Beach, CA
Measure S Bond Program, Orange Unified
School District – Orange, CA
Benton Middle School, Norwalk-La
Mirada Unified School District –
Norwalk, CA
Corvallis Middle School, Norwalk-La
Mirada Unified School District –
Norwalk, CA
Sunkist and Roosevelt Elementary
School Renovation Projects, Anaheim
Elementary School District – Anaheim, CA
Measure H Bond Program, Anaheim
Union High School District – Anaheim, CA
Aquatic Center at Anaheim High School,
Anaheim Union High School District –
Anaheim, CA
Central Kitchen at Katella High School,
Anaheim Union High School District –
Anaheim, CA
DROPS Site Improvements at Katella
High School, Anaheim Union High School
District – Anaheim, CA
Site Improvements at Cypress High
School, Katella High School, Anaheim
Union High School District – Anaheim, CA
Bell Education Center, Los Angeles
Unified School District – Los Angeles, CA
District I Existing Buildings Renovation
Program, Los Angeles Unified School
District – Los Angeles, CA
South Region High School #9, Los Angeles
Unified School District – Los Angeles, CA
Districtwide Bond Improvements,
Glendale Unified School District –
Glendale, CA
EDUCATION
• M.S., Construction Management,
University of Southern California
• B.S., Civil Engineering, DDIT, Gujarat
University, India
REGISTRATIONS / CERTIFICATIONS
• Engineer-in-Training, Board for
Professional Engineers, Land Surveyors
and Geologists, State of California
• LEED Accredited Professional, Building
Design and Construction, U.S. Green
Building Council
• OSHA-30
AFFILIATIONS
• American Society of Civil Engineers
• Construction Management Association
of America, Southern California
Chapter
• U.S. Green Building Council
YEARS OF EXPERIENCE
22+
cumming-group.com Page 660 of 1021 22 City of Hermosa Beach | City Yard Project Yuting Bao
Cost Estimator
Yuting is a Cost Estimator with over 8 years of varied experience in the construction industry, specializing in cost estimating and cost management. She has demonstrated expertise in estimating several large-scale projects exceeding $100 million. She brings a combination of technical, interpersonal, and team management skills, along with a highly diverse portfolio of project experience, including work with tech companies, educational facilities, land and seaports, water/wastewater treatment plants, healthcare, hospitality, aviation, municipal, and recreation projects. She has a strong knowledge base of all construction trades and maintains various vendor contacts within the industry. Yuting also has broad experience in leading project teams, reconciling and negotiating with contractors, and managing client relationships.
REPRESENTATIVE EXPERIENCE
Cypress College Science Building –
Cypress, CA
The project consisted of a new threestory science, engineering, and mathematics classroom building with
faculty offices and an immersive digital
classroom, along with site improvements.
Responsible for cost estimation from
conceptual design to bid package review;
reconciled with the contractor during
each design phase and developed
variance reports and a budget analysis
dashboard for the client. ($84M)
Harbor UCLA Master Plan
Implementation – Torrance, CA
Providing estimating support for
change order proposals, scope of work
modifications, design completion
allowance modifications, and base scope
cost estimate verifications for the $1.8
billion hospital master plan project.
Mt. SAC, Technology & Health
Replacement Building – Walnut, CA
The project consisted of a fourstory building featuring a variety of educational spaces, including
classrooms, laboratories, library areas,
offices, meeting rooms, hospitality
rooms, storage rooms, and more. Served
as Cost Manager, finalizing cost estimates
and variance reports for each design
phase; attended design meetings and
reconciled with the contractor; aligned
with the school district’s budget through
value engineering and alternative
solutions. ($182M)
VAMC Reno Feasibility – Reno, NV
The project consists of feasibility
studies of six scenarios of building up
a hospital campus, including hospital,
clinic, community living center, parking
structure, utility plant, offsite and onsite
utilities, renewable energy, hazardous
abatement, etc. One of the cost managers
on developing cost estimates on the six
scenarios; studied typical VA hospital
Tl designs and applied to the project’s
program forecasts; provided escalation
forecast analysis per client’s request;
eventually the client chose to move
forward with scenario 2 which involves in
complete new campus and central plant
with new site and offsite
San Jose State University, F1 Basement
and F1 Campus – San Jose, CA
This project consisted of six vertical
buildings with 18 floors each, two levels
of parking garage, and associated site
and infrastructure work. Served as lead
cost manager, developing shadow cost
estimates for pre-concept and concept
design levels; reconciled with the general
contractor and developed escalation
models for each trade. (Multi-Billion)
EDUCATION
• M.S., Construction Management,
University of Southern California, Los
Angeles
• B.S., International Construction
Management, Qingdao Technological
University, Qingdao, China
YEARS OF EXPERIENCE
8+
cumming-group.com Page 661 of 1021 23 City of Hermosa Beach | City Yard Project Eileen Ta
Labor Compliance
Eileen is an experienced labor relations professional with expertise in the implementation, administration, and enforcement of Project Labor Agreements/ Collective Bargaining Agreements, Small and Disadvantaged Business Enterprise Programs, National and Local Targeted Hiring Initiative Programs, Labor Compliance Programs, California Labor Code, Federal Davis-Bacon and Related Acts, and other applicable regulatory requirements and directives for various multi-million projects.
Throughout her career, Eileen has performed work in various sectors which include municipal, education, transportation, and housing for clients throughout the state of California such as Los Angeles Community College District, City of Long Beach, California High-Speed Rail Authority, Los Angeles Community College District, Orange County Transportation Authority, Housing Authority of the City of Los Angeles, among several other clients.
REPRESENTATIVE EXPERIENCE
Government - Municipal, State, Federal
• Central Basin Municipal Water District,
Montebello Hills Pump Station Project
• City of Cudahy, Lugo Park
Rehabilitation and Soccer Field ($1.6M)
• City of Long Beach, Promenade
Pedestrian Walkway Maintenance
Services ($66K)
• City of Long Beach, Graffiti Removal
Services ($4.9M)
• City of Long Beach, Convention CenterPerforming Arts Center Pedestrian Bridge on Seaside Way ($9.2M)
• City of Long Beach, 10th Street
Roadway Improvements ($1.7M)
• City of Long Beach, Studebaker Road
Street Improvements ($1.2M)
• City of Long Beach, 55th Way Landfill
Cover Improvements ($1.1M)
• City of Pomona, Federal Housing
Projects
• City of Pomona, Year-Round
Emergency Shelter Projects ($3.8M)
• County of Imperial, ADA Inclusive
Playground, Sunbeam Lake
• County of Imperial, ADA Inclusive
Playground, Wiest Lake
• County of Imperial, Behavioral
Health Juvenile Parking and Site
Improvements
• County of Imperial, Desert Shores
Soccer Park – Phase 1
• County of Imperial, Juvenile Hall
Building 39/New Basketball Court
• Long Beach Utilities Department,
Groundwater Treatment Plant HVAC
Replacement Project ($8M)
• Long Beach Utilities Department,
Sanitary
Transportation
• California High-Speed Rail Authority,
Small and Disadvantaged Business
Program ($68B)
• California High-Speed Rail Authority,
Construction Package 1 ($1B)
• Los Angeles County Metropolitan
Transportation Authority, Various
Projects
• Orange County Transportation
Authority, Various Grade Separation
Projects
• San Bernardino County Transportation
Authority, I-10 Eastbound Truck
Climbing Lane Project
• San Bernardino County Transportation
Authority, SR210 Lane Addition Project
Housing
• Housing Authority of the City of
Los Angeles, Pueblo Del Rio Tenant
Improvements
• Housing Authority of the City of Los
Angeles, Jordan Downs Public Housing
Redevelopment
Mixed-Use/Retail
• Baldwin Hills Crenshaw Plaza,
Broadway Building Rehabilitation at
Shopping Center, Los Angeles, CA
EDUCATION
• Master of Public Administration,
Public Policy Analysis, California State
University, Northridge
• B.A., History, University of California,
Los Angeles
• Project Management Certificate
Program, California Institute of
Technology, Pasadena, CA
AFFILIATIONS
• Member, ACE Mentor Program of
America, Los Angeles
• Member, Asian American Architects
and Engineers Association, Los Angeles
• Board Member, Business Development
Association, Orange County
• Member, City and County Engineers
Association of Los Angeles
• Board Member, Construction
Management Association of America
(CMAA), Southern California Chapter
YEARS OF EXPERIENCE
12+
cumming-group.com Page 662 of 1021 24 City of Hermosa Beach | City Yard Project Mark Walter, CBCP, EBCP
Commissioning Agent
Mark brings over 30 years of experience in building control system design, installation, and commissioning, with a proven track record of ensuring systems operate efficiently and reliably. Since 1997, he has specialized in building commissioning, successfully overseeing the commissioning of projects ranging from small-scale facilities to large, complex buildings. As a Certified Commissioning Authority (CxA), Mark has played a pivotal role in optimizing building performance, improving energy efficiency, and ensuring compliance with industry standards. Mark’s contributions to the industry extend beyond project work. For nearly a decade, he served on the Advisory Council of the California Commissioning Collaborative, where he helped shape policies, standards, and industry advancements in commissioning practices. His deep expertise and commitment to excellence make him a highly respected leader in the field.
REPRESENTATIVE EXPERIENCE
Judicial Council of California,
Courthouse Commissioning -
Statewide, CA
Mark served as the Commissioning
Authority for various courthouse
construction projects on behalf of the
Judicial Council of California (JCC),
ensuring that building systems meet
performance, efficiency, and reliability
standards. His services encompass the
development of commissioning plans,
design reviews, pre-functional checklists,
functional test procedures, and
comprehensive Building Management
System (BMS) and Energy Management
System (EMS) assessments. Additionally,
Mark has conducted energy modeling,
HVAC system evaluations, and system
controls tune-ups for key projects,
including the Burbank, Metrolink, and
Compton Courthouses. His current work
involves the ongoing commissioning of
the Burbank, Compton, and Metroplex
Courthouse projects, ensuring that these
facilities operate at peak efficiency while
meeting the stringent requirements set
by the JCC.
Orange County Public Works, El Toro
Healthcare Campus Commissioning -
Irvine, CA
Mark serves as the Commissioning
Authority for the Orange County El Toro
Healthcare Campus Project, a new
68,000-square-foot, two-story facility
located on a 4-acre site. This state-of-theart facility is designed to consolidate the administrative and operational functions
of multiple county departments within
a unified campus environment. The
project will establish a centralized hub for
the Orange County Emergency Medical
Services (OCEMS), Orange County Public
Health Laboratory (OCPHL), and Orange
County Health Care Agency (OCHCA)
Administration. Mark’s commissioning
services ensure that all building systems,
including HVAC, electrical, plumbing, and
controls, operate efficiently and meet
performance standards, supporting the
seamless integration of critical public
health and emergency services.
LA Metro, Commissioning Services -
Los Angeles, CA
Mark provides expert commissioning
oversight for LA Metro’s Measure M
capital projects, ensuring that all systems
meet the required performance and
efficiency standards. His responsibilities
include developing Owner’s Project
Requirements (OPR) and Basis of Design
(BOD) documents, preparing contractor
bid specifications for commissioning, and
overseeing construction commissioning
for various bus and rail capital
projects. Additionally, Mark has led the
commissioning of several HVAC retrofit
projects across 20 bus and rail operating
divisions, ensuring that these systems
operate at peak efficiency and support
Metro’s sustainability and operational
goals.
REGISTRATIONS / CERTIFICATIONS
• Certified Building Commissioning
Professional, Association of Energy
Engineers, #360
• Existing Building Commissioning
Professional, Association of Energy
Engineers, #98
• Certified Building Commissioning
Firm (CBCF), Association of Energy
Engineers, #001, 2012
REGISTRATIONS / CERTIFICATIONS
• American Society of Heating,
Refrigerating and Air-Conditioning
Engineers
• Association of Energy Engineers
• Building Commissioning Association
• BuildingSmart Alliance
• California Commissioning
Collaborative
• International Code Council
• National Institute of Building Sciences
YEARS OF EXPERIENCE
30+
cumming-group.com Page 663 of 1021 25 City of Hermosa Beach | City Yard Project June Pena
Move Manager
For the past 11 years, June has played a pivotal role in project success by managing moves in a way that corresponds the project’s vision, budget constraints, and client preferences. June is known for her exceptional project management skills, ensuring that moves and FF&E installations are executed seamlessly, on time, and within budget. Her ability to coordinate with various stakeholders, from interior designers and architects to suppliers and contractors, makes her an invaluable asset on any project. As Move Manager, June will coordinate all aspects of moving operations, such as planning the relocation of equipment, furniture, and personnel. She will create move schedules, work with vendors, manage inventories, and communicate timelines to all stakeholders to ensure a smooth transition in order to minimize disruption and ensure the space is ready for occupancy as work is completed.
REPRESENTATIVE EXPERIENCE
Los Angeles Community College
District, Sustainable Building Program
for Los Angeles Harbor College – Los
Angeles, CA
June served as an FF&E and Relocation
Project Manager/Consultant. She acted
as an Owner’s Authorized Representative,
facilitating FF&E selections, procurement,
and relocation services for both
LEED-certified new construction and
modernization projects. She ensured
compliance with the District’s policies
and construction guidelines, managed
building user relocations, facilitated
equipment training, and oversaw
project closeout activities. Additionally,
she worked closely with the asset
management team to track new and
existing FF&E assets, ensuring proper
RFID tagging for the district’s tracking
system.
Rancho Santiago Community College
District, Various Districtwide Projects –
Santa Ana, CA
June supports the Facilities Planning
and Construction Department in
executing bondfunded projects across
multiple campuses. She has played a
key role in the Johnson Student Center,
Science Center, and Health Sciences
buildings, assisting in project planning,
design, and construction phases. Her
responsibilities extend to furniture and
equipment procurement, user group
relocations, and post-move closeout
activities. Additionally, she manages
various Facilities Maintenance Requests
(FMRs), ensuring timely completion of
assignments while seamlessly adapting
to a remote work environment. She is
also leading the design phase for three
Access Control projects at the District’s
Operations Center, Santa Ana College,
and Santiago Canyon College.
Long Beach City College, Various
Campuswide Projects – Long Beach, CA
At Long Beach City College’s Carson
Campus, June assisting the Bond
Program Construction Management
Team with contractor submittals, change
orders, and payment applications. She
reviewed and expedited approvals
to keep critical path activities on
schedule. Additionally, she verified FF&E
procurement items, coordinated record
drawing reviews, and maintained digital
and hard copy project files. She also
organized weekly construction meetings,
documented meeting minutes, and
provided digital photo documentation of
construction progress.
Compton Unified School District, New
Compton High School – Compton, CA
June is providing move management and
FF&E services on the Cumming Group
team that is managing the construction
of the New Compton High School. This
involves demolishing existing buildings
and constructing new educational,
administrative, and athletic facilities.
EDUCATION
• Bachelor of Architecture, Woodbury
University, Los Angeles, CA
• Associate of Science, Architecture
Technology, Los Angeles Harbor
College
REGISTRATIONS / CERTIFICATIONS
• OSHA-30
YEARS OF EXPERIENCE
11 cumming-group.com Page 664 of 1021 26 City of Hermosa Beach | City Yard Project SECTION 5
Relevant Experience
and References
5.1 Reviewing Engineering Studies
5.2 Experience Procuring Consultant and Construction Contracts
5.3 Reviewing, Negotiating, and Facilitating and Guaranteed Maximum Price
5.4 Relevant Project Experience
5.5 Firm Facilities to Support the Project
5.6 Experience Monitoring a Project Schedule
5.7 BIM Overview
5.8 Recommend Project Management Information Systems
5.9 Ability to Provide Estimating, Value Engineering, and Budget Management
5.10 Experience working with Design-Bid-Build and Progressive Design-Build Models
5.11 History of Compliance with Federal, State, and Local Laws and Regulations
5.12 Familiarity with Authorities Having Jurisdiction
5.13 List of Projects that the Firm has been Declared in Default
5.14 Services by Subconsultants
Proposers shall highlight their experience providing similar services for other municipal clients highlighting the following:
The firm’s experience in reviewing engineering studies and understanding of how engineering studies are performed, and experience with construction administration.
5.1 – REVIEWING ENGINEERING STUDIES
Cumming Group has managed some of the most complex
projects in the region. Most of these projects require large engineering studies at the beginning of the project to
understand the risks associated with building the project. Two of the most common preliminary engineering reports that are applicable to this project include CEQA and/or NEPA analysis and Environmental Assessment of the property.
Managing CEQA and NEPA
A new construction project in California, like any project undertaken by a public agency or requiring agency approval, must undergo analysis under the California Environmental Quality Act (CEQA) or the National Environmental Policy Act (NEPA) if the City decides to pursue federal funding for this project. Cumming Group has managed thousands of projects requiring CEQA and/or NEPA clearances. We will work with the environmental consultant to perform an Initial Study (IS) to determine if the project is exempt from CEQA. If the project is determined to fall under specific exemptions outlined in the CEQA guidelines, like Class 2 that consists of replacement or reconstruction of existing structures and facilities where the new structure will be located on the same site as the structure replaced and will have substantially the same purpose
and capacity as the structure replaced or Class 32 In-Fill projects that are on sites of less than 5 acres within city limits surrounded by urban uses. The professional environmental consultant will make the appropriate determination.
Even straightforward projects can have environmental impacts, so it would not be surprising if the Initial Study determines additional analysis is required. Common areas of analysis include:
• Geology and Soils: Construction could temporarily disturb soils or affect geological stability.
• Cultural Resources: The consultant will review any historic components of the project (unlikely) or Tribal Cultural Resources that have significance to a Native American tribe. • Noise: Construction activities can generate noise, requiring analysis and potential mitigation measures during construction. • Traffic: Depending on the project’s size and location, construction activities might impact traffic patterns, requiring analysis and mitigation measures.
• Energy and Greenhouse Gas Emissions: Construction
requires energy, and potential impacts related to greenhouse gas emissions may be considered.
These areas of potential impact would be documented in a Negative Declaration (ND) if the project will not have significant adverse environmental effects, or a Mitigated Negative
Declaration (MND) if potential impacts can be reduced to a lessthan-significant level with mitigation measures. In the unlikely event the project may cause significant adverse environmental effects that cannot be avoided, a more detailed Environmental Impact Report (EIR) would be prepared. The EIR analyzes potential effects, identifies mitigation measures, and considers alternatives to the project.
Finally, these would be presented to the public and approved/ adopted by City Council prior to the start of construction.
Environmental Assessment
As identified in the RFQ, the property has a dubious
environmental history with Underground Storage Tanks (USTs) located on site and the property being classified as a dump from the 1920s to the 1950s. The RFQ states that the dump accepted municipal wastes, such as glass, porcelain, ceramic, metal, and burn ash and refuse was burned on-site. We’ve run into this exact scenario multiple times with LA County Park projects.
These parks arose from leftover land that nobody would build on, and we’ve encountered many surprises at these facilities during excavation.
At the Helen Keller Community Center project, the contractor discovered buried trash during excavation for the building foundations. Given the timeline of the materials that were found buried (1920s – 1950s), it was determined that the materials likely contained asbestos and lead. When testing was completed, it was confirmed that there were heavy
concentrations of hazardous materials. The community
center project stalled and a full site remediation through a Remediation Plan (Procedure 5) had to be completed before construction of the Community Center could resume.
Cumming Group worked with a team of consultants to get a Procedure 5 approved through AQMD and RWQCB. The landfill was ultimately capped and clean soil was imported to cover the park to prevent the public from coming into contact with the contaminated soils.
The history of the USTs will require additional administrative investigation since the closure of the tanks does not appear on the State’s geotracker website that identifies open and closed UST cases throughout the state. The selected environmental assessment consultant will be able to determine the status of these tanks through additional investigation with LA County and the RWQCB.
SECTION 5
Relevant Experience and References
cumming-group.com Page 666 of 1021 28 City of Hermosa Beach | City Yard Project Experience assisting public owners with selection of and soliciting statements of qualifications and proposals from construction professionals and consultants, including an architect/engineer, construction manager-at-risk and design-builder.
5.2 – EXPERIENCE PROCURING CONSULTANT
AND CONSTRUCTION CONTRACTS
Cumming Group brings extensive experience supporting public agencies through every stage of the procurement process – from defining scopes and developing solicitation documents to managing awarded contracts through completion. The
following outlines our proven approach to procuring and administering consultant, construction, best-value, and publicprivate partnership contracts.
Consultant Contracts
Typically, consultants are procured through a qualificationsbased selection. The City may have a set of as-needed consultants for immediate needs and smaller projects that are procured and managed by the Contracts Department. With
larger projects and programs, the City solicits and procures individually. Cumming Group would have the opportunity to provide procurement input for this City Yard Project by assisting with the determination of proper qualifications required.
Cumming Group would help write the scope of work, prepare a Request for Qualifications, and assist the City with the negotiation of fees and execution of the contract.
Once the consultant contracts are finalized and Notices to Proceed are issued, Cumming Group would begin the
administration of the contracts. Administration would involve establishing kick-off meetings, conducting regular project meetings, defining the required deliverables, reviewing draft and final reports, and reviewing and initialing invoices.
Construction Contracts
For low-bid procurements, Cumming Group will help prepare the bid documents, advertise the project, and assist the Contracts Department with evaluation of the bids. We will then work with the lowest responsive and responsible bidder to submit a schedule and schedule of values for review through a consultant agreement. Upon acceptance of the schedule and schedule of values, Cumming Group will prepare a Notice to Proceed (NTP) to begin administration of the construction contract. Once the NTP has been issued, Cumming Group will work to establish kick-off meetings, conduct regular project meetings, respond to RFIs, negotiate change orders, review and initial pay applications, and issue project closeout documents.
Best-Value Contracts
Construction contracts procured through best value selections (qualifications-based) are substantially different than construction contracts procured by low bid. Careful attention must be paid to the management of the scoping documents and the qualifications-based selection of the design-build entity. Cumming Group has managed dozens of design-build, CMAR, and P3 projects, so we are very familiar with the lessons learned of previous best value projects, especially during the procurement and administration processes.
Cumming Group will work tirelessly during the programming and scoping phases to ensure that the needs of the user group are met and translated into a written (and sometimes graphic) document. This phase is critical to prevent exceeding design allowances and change orders during the administration of the best value contract. Parallel to the development of the scoping documents, Cumming Group will assist the City to develop a Request for Qualifications to procure the best value entities. We can then assist with reviewing the submitted qualifications to shortlist a few teams. Our project manager will then meet with the shortlisted teams to help develop their design schemes and assist the City with final selection.
Cumming Group’s tasks will then shift to management of design and construction activities concurrently. We will review the intermittent design packages for conformance with the scoping criteria and make sure that the City’s interests are fulfilled. We will also advocate for the best value team to provide a design manager to ensure the design excellence criteria are being included in the project. We will facilitate presentation meetings and partnering sessions with the City and the user groups. Once all construction activities have commenced, we will provide schedule and cost control management, conduct regular project meetings, review and initial pay applications, and issue project closeout documents.
cumming-group.com Page 667 of 1021 29 City of Hermosa Beach | City Yard Project Public-Private-Partnership/Development Contracts
Cumming Group has experience writing RFPs to procure a
developer in P3 projects. We will develop the scope of work, the terms of the transaction, identify public engagement opportunities, and establish the evaluation criteria for this unique project.
We will also work with a financial consultant to understand the market conditions, identify the terms of the exclusive negotiation period, and establish the deposit and structure of the agreement (i.e. Design-Build-Finance-Operate-Maintain).
Our team will work closely with City Counsel to identify the correct government code that allowed for this contracting method (Government Code Section 25549.1, requiring a joint use component).
Following the scoping/RFP stage, we will assist the City in the selection process as a peer evaluator. Once a shortlist is developed, we set up presentations and working meetings with the teams. Shortlisted proposers will have the opportunity to provide their Letter of Intent (LOI) to the City outlining their proposal, including certain proposed terms and a high-level summary of proposed land uses, massing, entitlements, and ground lease structure.
Based on the submittal, presentation, working meetings, and the LOI, we will assist the City to recommend the highest-rated Proposer to the City council for selection as the Developer.
Following Council approval, we work with the City and selected Developer to execute an Exclusive Negotiation Agreement (ENA), which among other items, provides for an exclusive negotiation period during which specific deal terms will be identified. At this stage, the non-refundable deposit is also collected from the Developer.
As the City’s owner representative, we continue to manage the entitlement, environmental documentation, site analysis, design, and construction processes, carefully balancing the duties of putting the City’s interests at the forefront and not bogging the developer down through excessive contract
administration. Through this process, we ensure that the Developer is at-risk for project completion, but we assist wherever possible to help expedite the project.
The firm’s experience in reviewing, negotiating and facilitating a guaranteed maximum price, particularly in public projects.
5.3 – REVIEWING, NEGOTIATING, AND
FACILITATING A GUARANTEED MAXIMUM PRICE
In addition to the firm having reviewed, negotiated, and facilitated thousands of Guaranteed Maximum Price (GMP) contracts across North America and Europe, the proposed Project Manager, Matthew Feldhaus has negotiated dozens of GMP contracts, both in the private sector and the public sector.
Most recently, Mr. Feldhaus negotiated a $640 million GMP contract for LA County’s first ever CMAR project – the Hall of Administration Seismic Retrofit project. This was a complex project to install a base isolation seismic retrofit system at the foundation level of a 1M-sq.-ft. office building that is to remain occupied during construction. The pre-construction phase took 18 months and the GMP negotiation lasted several months as we worked with the CMAR to refine their schedule and sequencing, right-size the scope of work, lock-in pricing for long lead items like the isolators, and utilize locally sourced, readily available materials for the project. The ultimate result of this value engineering effort reduced $60M from the project budget.
We will apply the same systematic approach and methodology to this project to ensure the City obtains the best value for the project and our community.
Fire Station No. 1, Santa Monica
cumming-group.com Page 668 of 1021 30 City of Hermosa Beach | City Yard Project Prior experience in providing owner’s representative services on similar projects. Include: (a) description of the project and the services your firm provided for the project; (b) start and completion dates for each project; and (c) name, title and telephone number of the client contact most familiar with your services on the project.
5.4 – RELEVANT PROJECT EXPERIENCE
On the following pages, Cumming Group has provided our relevant public sector projects within the last several years that demonstrate our experience across key categories of this project. Each project includes elements that align closely with the scope and requirements outlined in the RFP, which we have detailed in each project description. Our firm brings deep expertise in construction management for a wide range of vertical and building projects, including public works projects, commercial and municipal facilities, essential facilities, and community-serving infrastructure. 1 Imperial Yard Relocation Study – South Gate, CA
2 El Segundo Yard, Saticoy Yard, and Lower Yard Renovations – Los Angeles County, CA 3 Southern Youth Correctional Reception Center and Clinic (SYCRCC) Facility Assessment and Demolition Project – Norwalk, CA 4 Alcazar Yards / Central Juvenile Hall Redevelopment – Los Angeles, CA 5 Rancho Los Amigos – Downey, CA
6 Helen Keller Community Center and Site Remediation – Los Angeles, CA 7 LAC+USC General Hospital Redevelopment – Los Angeles, CA 8 Hall of Justice Repair and Reuse – Los Angeles, CA
9 Hall of Administration Seismic Retrofit – Los Angeles, CA 10 3965 Vermont Avenue Building Evaluation and Feasibility Study – Los Angeles, CA 11 LA County Emergency Operations Center – Los Angeles, CA 12 Drake Chavez Park Improvements – Long Beach, CA
RANCHO LOS AMIGOS – DOWNEY CA
cumming-group.com Page 669 of 1021 31 City of Hermosa Beach | City Yard Project Cumming Group worked with the Los Angeles County Flood Control District and Public Works to develop a conceptual plan for the replacement and relocation of the Los Angeles County Flood Control District facilities at the southern portion of Imperial Yard in South Gate, CA to allow for the construction of the Southeast Los Angeles (SELA) Cultural Center.
The SELA Cultural Center is a Frank Gehry-designed project that consists of a multi-arts facility that includes artist studios, film studios, recording studios, theater space, classrooms, offices, event space, kitchen space, and outdoor recreational areas. The Cultural Center is to be constructed at the southern portion of the facility, adjacent to the Los Angeles River.
The team worked with the Flood Control District to identify available maintenance yard relocation sites to effectively replace services at the existing yard. Provided research and evaluation of potential sites as well as programming, space planning, and community outreach.
County of Los Angeles
Imperial Yard Relocation Study
South Gate, CA
Start and Completion Dates
2023-2024 (Future Phases Pending)
Services Provided
Master Planning
Feasibility Study
Design Management
Finance Studies
Real Estate Consultancy
(Future Phase PMCM Services Pending
Funding Approvals)
Client Contact
Tom Afschar
Capital Projects Program Manager
626.300.3201
[email protected]
cumming-group.com Page 670 of 1021 32 City of Hermosa Beach | City Yard Project Cumming Group managed the planning, design, permitting, bidding, construction, and closeout phases for renovations to multiple LA County Public Works Maintenance Yard facilities as part of the $750M Facilities Reinvestment Program (FRP) that provided prioritized capital improvement renovation projects at existing County-owned facilities. All projects were executed using Job Order Contracting (JOC).
The scope of work at each facility varied, but mostly included the following renovations and upgrades:
• Roofing replacements
• HVAC and electrical upgrades
• ADA upgrades at restrooms, entrances, and parking lots • Entry/security gate replacements
• Paint spray booth replacements (required extensive AQMD coordination) • Generator replacements (required extensive AQMD coordination) • Interior renovations to office/maintenance buildings including minor interior wall reconfigurations, new furniture, painting, and flooring replacements.
Each renovation had to be carefully coordinated while operations continued on site during each renovation. Cumming Group assisted with move management, phasing/planning, scheduling, and FF&E coordination. New AQMD regulations for generators and spray booths were enacted just prior to the construction phase and Cumming Group was able to advise the client to meet the new regulations without exceeding the original budget.
County of Los Angeles
El Segundo Yard, Saticoy Yard,
and Lower Yard Renovations
Los Angeles County, CA
Start and Completion Dates
2020-2022
Services Provided
Project Management
Design Management
Construction Management
Schedule Support
Cost Management
Client Contact
Tom Afschar
Capital Projects Program Manager
626.300.3201
[email protected]
cumming-group.com Page 671 of 1021 33 City of Hermosa Beach | City Yard Project Cumming Group led a team of evaluators analyzing the existing Southern Youth Correctional Reception Center and Clinic (SYCRCC) facility in Norwalk.
At the time of our contract, the site was owned by The State of California and had been determined to be excess property and was available for purchase and/or ground lease for development. The facility was formerly operated as a youth detention facility, which was officially closed in the Fall of 2011. The County of Los Angeles Probation Department considered the purchase of this property to facilitate employee training and consolidate other departmental administrative functions.
The facility currently contains approximately 31 buildings over 32-acres. The facility consists of a series of single-story buildings in a gated, secure campus arranged around central recreational courts and lawns. The site also includes additional outbuildings such as storage facilities and single- family residences that were previously occupied by staff. The campus was developed in various phases since 1954 including the construction of cell complexes, classrooms, dining and recreational facilities, a health clinic, maintenance, warehouse facilities, gymnasium, pool, and administrative offices. The original buildings typically have a concrete slab-on-grade, double-wythe clay brick walls, and a concrete roof diaphragm.
The objective of the study was to evaluate the existing buildings/facilities and infrastructure for potential future use as a County training facility for trainees and existing Probation Officers. The facility was evaluated for a 30-year useful life and the study included additional project alternatives for development.
The report included conclusions about the viability of the property for the intended use, recommendations on maintenance and repairs, improvements necessary to meet the objectives, and an opinion of probable costs.
NOTE: Cumming Group was selected in October 2025 by the City of Norwalk to mange the demolition and redevelopment of this project site.
County of Los Angeles
Norwalk SYCRCC Evaluation
Norwalk, CA
Start and Completion Dates
2014-2015 (Facility Assessment)
2025-2028 (Demolition and Construction)
Services Provided
Building/Facility Assessment
Project Management
Construction Management
Environmental Management
Schedule Support
Cost Management
Client Contact
Derek Ly
Senior Civil Engineer
626-458-7350
[email protected]
cumming-group.com Page 672 of 1021 34 City of Hermosa Beach | City Yard Project The Alcazar Yards and Central Juvenile Hall Redevelopment Feasibility Study is assessing the current conditions of the infrastructure and facilities at Central Juvenile Hall and Eastlake Juvenile Courthouse, gathering program data on the current and future operational needs of the Juvenile Hall and Courthouse, considering population consolidation with other existing Los Angeles County juvenile halls for efficiency, and incorporating the findings of the first two phases into a campus plan that will maximize the efficiency of the site and the seamless delivery of services to juveniles. Participants in the study include the Probation Department, Public Defender, Alternate Public Defender, Sheriff’s Department, District Attorney, Public Health, and the California Judicial Branch.
The completed Alcazar Yards and Central Juvenile Hall Redevelopment Feasibility Study includes construction cost estimates for the proposed campus plan, a phasing plan maintaining full operations during recommended construction, and a recommendation on the location of the proposed replacement site for the Eastlake Juvenile Courthouse.
This information will enable the County and the State to negotiate a land agreement to allow for the purchase of County property for the new Eastlake Juvenile Courthouse.
Site options were developed with the following goals:
• Establish a new Court Building site with a phased relocation plan ensuring uninterrupted Court and Probation operations at Eastlake • Improve efficiency and coordination between Court and Probation functions
• Create a rehabilitative environment aligned with modern juvenile justice practices
• Enhance dignity for youth through increased privacy, cleanliness, and appealing spaces in the Halls
• Support and expand diverse programming that reflects contemporary approaches to juvenile rehabilitation and re-entry
County of Los Angeles
Alcazar Yards / Central Juvenile
Hall Redevelopment
Los Angeles, CA
Start and Completion Dates
2022-2023 (Future Phases Pending)
Services Provided
Building/Facility Assessment
Project Management
Design Management
Cost Management
(Future Phase PMCM Services Pending
Funding Approvals)
Client Contact
Scott Sanders
Bureau Chief
562-940-2523
[email protected]
cumming-group.com Page 673 of 1021 35 City of Hermosa Beach | City Yard Project Cumming Group is providing project and construction management services for the $2.7-billion master planning, redevelopment, and construction of the Rancho Los Amigos campus. On an existing 200+ acre campus, the development consists of 5M sq. ft. of medical, county office, commercial office, retail, restaurant, hotel, and parking, as well as new infrastructure.
Rancho Los Amigos South Campus
Cumming Group managed the full remediation and removal of 105 structures across 70+ acres, along with stabilization efforts for two historic buildings and recycling of over 1,200 pallets of bricks. The project required the development of dozens of Procedure 5 work plans, which underwent rigorous review by the South Coast Air Quality Management District. All structures underwent thorough remediation and were subsequently demolished.
Notably, the historic power plant’s stabilization process included lifting the cooling tower off the roof and implementing extensive shoring for support. The Casa Consuelo historic building was also stabilized, and a new roof was installed with proper drainage. The project was completed ahead of schedule, achieving a commendable record of zero safety incidents or environmental impacts.
The demolition of the South Campus was undertaken due to severe blight and public safety issues. The campus had been abandoned for 20+ years and was the constant target for vandalism, theft, and arson.
The demolition of the campus made way for the first redevelopment project on the South Campus, the $468 million new ISD and Probation Department headquarters. The project will create vitally needed new facilities for various County departments located in aging and costly buildings throughout the County. The renovated campus will respect the property’s history and provide a high-quality work environment for County staff. The proposed project will be designed to achieve LEED Gold certification or better.
County of Los Angeles
Rancho Los Amigos
Master Plan and South Campus
Downey, CA
Start and Completion Dates
2010-Ongoing
(Demolition Completed 2022-2023)
Services Provided
Project Management
Design Management
Construction Management
Environmental Management
Schedule Support
Cost Management
Client Contact
Felicia Yang
Unit Head
326-300-3272
[email protected]
cumming-group.com Page 674 of 1021 36 City of Hermosa Beach | City Yard Project The Helen Keller Park Community Building project included demolition of an outdated facility constructed with hazardous materials. A 4,000-sq.-ft. LEED Gold-Certified state-of-the-art building was erected in its place, with 90% of the original building materials being recycled or reused. The new structure utilizes CMU and light-frame construction, and the facility includes a computer training room with 16 computer stations, a multi-purpose room, an outdoor patio with a recycled wood trellis, and a community room with an adjacent catering kitchen.
Helen Keller Park Landfill Remediation
The Helen Keller Park Remediation project arose from the discovery of buried lead- and asbestos-containing construction debris during the construction of the new Community Center. The scope of work included demolition of existing park amenities and environmental site remediation. General improvements included a new parking lot, a new playground and exercise equipment, and a new baseball field. Multiple biofiltration basins were constructed, along with irrigation, for the replaced landscaping. The remediation scope of work for the 6.6-acre park included removing the top 12” of soil and relocating it to the baseball field, which was surrounded by a retaining wall to contain the contaminated soil. The soil cover plan then required two layers of a fabric barrier with 12” of clean fill on top. The plan’s purpose was to reduce the risk of park users’ contact with the waste material and to reduce infiltration into the waste. This project required the management of various specialized contracts, including full-time environmental monitoring and environmental remediation consultants, as well as a general contractor with specialized training based on the Air Quality Management District’s Procedure 5 requirements.
Management included additional coordination with other jurisdictional agencies, including the State Regional Water Quality Control Board, Los Angeles County Public Health, and the Los Angeles County Environmental Programs Division. The team also participated in numerous community meetings to provide information on the hazardous remediation efforts.
County of Los Angeles
Helen Keller Community Center
and Site Remediation
Los Angeles, CA
Start and Completion Dates
2012-2015
Services Provided
Project Management
Design Management
Construction Management
Environmental Management
Schedule Support
Cost Management
Client Contact
Zohreh Kabiri
Section Head
626-300-2265
[email protected]
cumming-group.com Page 675 of 1021 37 City of Hermosa Beach | City Yard Project Cumming Group has, on behalf of the County of Los Angeles Chief Executive Office, been leading or co-managing the redevelopment of General Hospital and West Campus since 2018. Cumming Group is a subject-matter expert regarding this iconic County-owned historic asset and has been advising the County on redevelopment analysis, market analysis, community engagement, and financial feasibility for multiple development scenarios. Cumming Group also remains active in community engagement by reviewing community engagement materials, messaging, and attending community engagement meetings, and providing expertise and experience to the developer team.
Cumming Group represents the CEO in the developer’s Master Plan development process, ensuring County and community equities are represented and reviewing all sources, uses, costs, funding sources, and proformas to ensure financial feasibility. Multiple challenges face the redevelopment of the General Hospital and portions of West Campus. The General Hospital requires significant investment in environmental remediation, seismic and structural retrofits, and complete infrastructure replacement. Many of the structures on West Campus are old, underutilized, and in need of demolition. The West Central Plant and other utilities on the campus are old, inefficient, and support adjacent additional county-owned sites. Most of the campus utility configuration needs to be replaced and updated with modern utility plants and tie-ins.
Lastly, there is a significant grade change between portions of the campus, creating challenges in connectivity, mobility, and pedestrian access. Cumming Group’s renowned cost group will be advising the County on means to reduce project implementation costs and right-size the infrastructure investments for the planned development.
County of Los Angeles
LAC+USC General Hospital
Redevelopment
Los Angeles, CA
Start and Completion Dates
2018-Ongoing (Est. 2030)
Services Provided
Project Management
Design Management
Construction Management
Public/Community Outreach
Cost Management
Client Contact
Kelly Quinn
Manager, LA County CEO Master
Planning Division
213-974-2318
[email protected]
cumming-group.com Page 676 of 1021 38 City of Hermosa Beach | City Yard Project The Hall of Justice was constructed in 1925 as a steel-frame structure encased in concrete, with concrete floor slabs, granite exterior veneer, and hollow clay tile interior partitions. The building consisted of 14 floors, including a basement and a roof level penthouse. The program included Class-A office space for the Sheriff’s Department, Coroner, District Attorney, Public Defender, and Tax Collector.
The 1994 Northridge earthquake forced the building to close its doors considering the significant damage. The Repair and Reuse project consisted of several phases of work, including debris removal, non-structural demolition, structural demolition, seismic retrofit work, the removal of two floors, the addition of shotcrete walls, and other seismic upgrades throughout the building.
The Beaux Arts exterior was restored along with other character-defining historical elements, including the impressive loggia, communicating stairs, corridors, a law library and a courtroom. The historic fabric of the elevator lobbies was maintained but was retrofitted with a new Destination Dispatch elevator technology. Public elements of the building include the restored loggia, Hall of Justice Interpretive Center, and cafeteria.
Neighboring the Hall of Justice is a new 1,000-car garage. The architectural precast and metal panel exterior live harmoniously with the facade of the main building by evoking the sense of place and time in which it is historically associated.
The interweaving of rehabilitated historic material, modern tenant improvements to the building, the addition of a parking structure, and pleasing and appropriate site improvements help to further enhance the urban environment of downtown Los Angeles
County of Los Angeles
Hall of Justice Repair and Reuse
Los Angeles, CA
Start and Completion Dates
2011-2015
Services Provided
Project Management
Design Management
Construction Management
Environmental Management
Schedule Support
Cost Management
Client Contact
Zohreh Kabiri
Section Head
626-300-3265
[email protected]
cumming-group.com Page 677 of 1021 39 City of Hermosa Beach | City Yard Project Cumming Group provided Owner’s Representative Project Management and Project Controls services for the $680M seismic retrofit of the Kenneth Hahn Hall of Administration (HOA) building in the City of Los Angeles. The existing building was designed and constructed in the late 1950s and is an 8-story structural steel and poured-in place concrete structure with a basement, a subbasement, and mechanical penthouse. The building gross floor area is approximately 1M sq. ft. and is the seat of the government of the County of Los Angeles.
The project was meant to utilize a base isolation retrofit technique, utilizing a phased and multi-shift construction approach, with the building to be occupied during construction. The base isolation would require a “moat” to be developed at ground level with flexible joints to allow an unrestricted range of motion at all utility connections servicing the building. Areas of intense interior work will require some tenants to be relocated to other parts of the building or to an alternate building location. When complete, the retrofitted building would meet an Enhanced Seismic Performance Objective to allow for immediate occupancy after a BSE-1E to BSE-2E level seismic event.
The project used the County’s first ever Construction Manager At-Risk (CMAR) delivery method. Cumming Group assisted the County with the development of their CMAR contract documents and policies. Cumming Group also provided design management, value engineering, phasing recommendations, interior design feasibility studies, code analysis, interim exiting planning, internal and external community outreach, and move management.
The project was canceled following the completion of the pre-construction phase due to the County’s master plan efforts of the downtown civic center and their subsequent purchase of the Gas Company Tower building in 2024. The A/E team and CMAR were successfully off-ramped at the completion of the preconstruction phase.
County of Los Angeles
Kenneth Hahn Hall of
Administration Seismic Retrofit
Los Angeles, CA
Start and Completion Dates
2022-2024
Services Provided
Project Management
Design Management
Construction Management
Schedule Support
Cost Management
Client Contact
Tom Afschar
Capital Projects Program Manager
626.300.3201
[email protected]
cumming-group.com Page 678 of 1021 40 City of Hermosa Beach | City Yard Project Cumming Group led a team of evaluators that analyzed the existing building at 3965 South Vermont Avenue for the Los Angeles County Probation Department.
The scope of the evaluation included architectural, structural, ADA evaluation, and building code analysis, as well as mechanical, electrical, plumbing, waterproofing, low voltage, and conveyance systems.
The analysis of the property was fast tracked to respond to a Board of Supervisors motion.
Following the building analysis, the team oversaw space planning and programming in conjunction with the County CEO and Probation Department to ensure the proposed program fit within the existing building footprint.
The project scope also included management of the construction cost estimate, project delivery schedule, and creating a Total Project Cost Estimate for the project.
County of Los Angeles
3965 Vermont Avenue
Los Angeles, CA
Start and Completion Dates
2016-2018
Services Provided
Building/Facility Assessment
Planning Services
Project Management
Design Management
Schedule Support
Cost Management
Client Contact
Felicia Yang
Unit Head
326-300-3272
[email protected]
cumming-group.com Page 679 of 1021 41 City of Hermosa Beach | City Yard Project Cumming Group is providing Project Management services for the comprehensive renovation of the County of Los Angeles Emergency Operations Center (EOC). This critical project aims to modernize the facility and extend its service life by an additional 30 to 40 years through a full interior remodel and systems upgrade.
The EOC is the County’s central hub for emergency coordination and disaster response. The renovation will enhance operational efficiency, flexibility, and collaboration by reconfiguring interior layouts, eliminating outdated tiered flooring, and maximizing usable space. Critical building systems such as HVAC, electrical, plumbing, fire/life safety, and elevators which will be assessed and upgraded to improve performance and reliability.
To maintain continuity of operations throughout construction, the project will follow a carefully phased implementation plan, including move management services and the provision of temporary facilities as needed. The renovation will integrate modern communications and audio/visual systems, enhance security, and improve staff amenities such as a dedicated lounge, bunk rooms, restrooms, and showers.
Cumming Group’s role includes project leadership, coordination among County stakeholders, oversight of design and construction phases, and support in meeting the County’s project delivery goals.
County of Los Angeles
Emergency Operations
Center Renovations
Los Angeles, CA
Start and Completion Dates
2025-Ongoing (Est. 2028)
Services Provided
Project Management
Design Management
Construction Management
Schedule Support
Cost Management
Client Contact
Leslie Luke
Deputy Director
323-980-2269
[email protected]
cumming-group.com Page 680 of 1021 42 City of Hermosa Beach | City Yard Project Cumming Group is providing Owner’s Representative Project Management and Construction Management services for the $100M Drake Chavez Park. The project spans 700,000 sq. ft. along the east side of the Los Angeles River.
The project is part of the Drake Chavez Vision Plan. It will be programmed and designed in close coordination with multiple capital projects, including the Shoemaker Bridge Replacement, Shoreline Drive Re-alignment, and the Long Beach Municipal Urban Stormwater Treatment (LB-MUST) project.
Long Beach is preparing to welcome the world to the city for the 2028 Olympics with the City’s infrastructure investment plan “Elevate 28,” a 5-year (FY 23 to FY 27) infrastructure program made of projects dedicated to serving Long Beach parks, community and public facilities, access to mobility, and street improvements. The plan includes 2028 Olympic Legacy projects that were selected to prepare the City of Long Beach to host the LA 2028 Olympic Games and to welcome hundreds of thousands of expected visitors.
The Drake Chavez Park improvements project involves management of multiple public amenities, requiring coordination with various stakeholders, regulatory agencies, and contractors. By employing advanced project scheduling, proactive issue resolution, and continuous quality monitoring, we will ensure the timely and successful completion of this large-scale park project while minimizing disruptions to the surrounding community.
City of Long Beach
Drake Chavez Park
Improvements
Long Beach, CA
Start and Completion Dates
2024-Ongoing (Est. 2028)
Services Provided
Project Management
Design Management
Construction Management
Environmental Management
Schedule Support
Cost Management
Client Contact
Catherine Nguyen
Capital Projects Program Manager
562-972-9627
[email protected]
cumming-group.com Page 681 of 1021 43 City of Hermosa Beach | City Yard Project The firm’s equipment and facilities and the location, availability and accessibility of facilities and equipment to support staff activities on the Project.
5.5 – FIRM FACILITIES TO SUPPORT THE PROJECT
Our South Bay/Hermosa Beach office will service this project. This is our community and we are grateful to be able to support the City where we live and work. Our office is located about a 10-minute walk to the main project site at 555 6th Street, and within a few minutes from the other two yard locations at 1110 6th Street and 530 4th Street. The lead Project Manager, Matthew Feldhaus, is based out of this Hermosa Beach office and 25 additional project management and construction support staff are available from this location.
In addition to the staff located out of the Hermosa Beach office, Cumming Group has 375 team members located in Southern California across four other office providing a wide array of Owner’s Representative Project Management and Construction support services. These resources and close proximity to the project sites ensures that any service that may be required during this project will be readily available.
The firm’s experience in monitoring a project schedule.
5.6 – EXPERIENCE MONITORING A PROJECT SCHEDULE
Understanding the Contract terms and applying advanced scheduling techniques is key to minimizing schedule impacts. Too often time extensions and damages are assessed based on simplistic measures, such as robotically using the total duration of a delay for granting the number of days for a time extension. Our team of construction managers and scheduling professionals are adept at considering all influences on the project and its schedule to address the delay using a Critical Path Method (CPM) analysis. The CPM’s ability to accurately represent living, growing projects is what makes it ideal for determining how an event may potentially impact project completion. Our team of scheduling professionals will perform the following tasks to minimize schedule impacts for the project:
• Assist the City to build a master schedule for the project that identifies completion dates for various activities. • Review and approve the contractor’s task-level baseline project schedule prior to executing the GMP contract. • Review and analyze the contractor’s updates to the baseline schedule on a monthly basis with the submittal of the pay application.
• Require the contractor to submit a time-impact analysis whenever requesting a change to the schedule. • Identify and classify the schedule change according to the contract:
– Excusable, Non-compensable Delay
– Excusable, Compensable Delay
– Non-Excusable, Non-Compensable Delay
– Non-Excusable, Compensable Delays
• Request a recovery schedule from the contractor when the contractor has been identified as the cause for delay • Enforce the liquidated damages clause of the contract when the contractor is causing a delay Cumming Group
Project Site
Yard Location
Yard Location
cumming-group.com Page 682 of 1021 44 City of Hermosa Beach | City Yard Project The firm’s ability to evaluate programs related to building information modeling software and provide Owner with an overview of BIM.
5.7 – BIM OVERVIEW
Cumming Group has embraced the advantages of Building
Information Modeling (BIM) technology to design and produce complex buildings and building systems, and to facilitate and coordinate our work during construction. The integration of building systems and clash detection has revolutionized the design process. We embrace this technological advancement, as well as the incorporation of other newer technologies like cloud storage, Bluebeam Revu, and the use of mobile devices and tablets to facilitate collaboration and speed up response times.
Using BIM technology, the designers will create three
dimensional images for the project team as well as user groups to better understand the design solutions. BIM technology also allows for improved quality control of the building documents by performing clash detections to prevent accidental oversights such as placing ductwork where structural beams exist. This software helps the coordination between disciplines and greatly reduces the number of errors and omissions that result in costly change orders.
In certain cases where the maintenance program is
sophisticated, we would recommend a 4-D or 5-D BIM model that allows for Critical Path Method (CPM) scheduling, supply chain management, cost estimating, risk management, and interoperability with other maintenance software.
Our role in this process is to ensure that the contract documents and the project specifications are properly written to provide the desired outcomes for the BIM model. We also have technical staff available to monitor and review the BIM files to ensure the drawings are layered properly according to developed BIM standards. Our staff can use the clash detection feature during the DD and CD phases to determine areas of potential conflict, especially in complex programs where there may be several contractors and consultants working independently to deliver projects.
The record keeping, reporting, monitoring and other information management systems that the firm would propose to use for the Project.
5.8 – RECOMMENDED PROJECT MANAGEMENT
INFORMATION SYSTEMS
Cumming Group has a long history of providing management of project controls systems for large public agencies since our inception in 1996. We have used most of the PMIS systems out there and some are more effective than other given the size and complexity of the project. We are currently utilizing multiple systems including Procore, eBuilder, Prologix, ACC Build, EcoSys, Ingenious Build, Join, Asite, etc. While Cumming Group is agnostic on the PMIS used on most projects because our team is well-versed on multiple platforms, we are able to provide Procore on this project at no additional cost to the City.
Cumming Group has a national agreement with Procore to help support our programs and projects and it is available for this project, should the City elect to use it.
We can also leverage our in-house construction specialist Data Analytics team for the development of custom tools and dashboards tailored to the City’s needs. In addition to customizing project cost, budget, schedule, and asset management reporting to meet client and end user needs, our data scientists are exploring ways to integrate AI and advanced technology to streamline processes, improve accuracy, and enhance overall project outcomes.
These tools help streamline project management by integrating various software platforms (like Procore and Bluebeam) into one cohesive system, facilitating smoother collaboration and communication. With all of our tools in one location, we keep everything organized, track project milestones, allocate resources, and manage documents all in one place. This system ensures that everyone involved has quick access to critical project information, promoting transparency and enabling smarter decision-making throughout the project life cycle.
JAMES A. MUSICK JAIL EXPANSION, IRVINE
cumming-group.com Page 683 of 1021 45 City of Hermosa Beach | City Yard Project The firm’s ability to provide estimating, value engineering, and assistance with managing budgets.
5.9 – ABILITY TO PROVIDE ESTIMATING, VALUE
ENGINEERING, AND BUDGET MANAGEMENT
Cumming Group started in 1996 as a cost estimating firm and today has grown into the largest owner’s representative PMCM cost estimating firm in the country. Cost estimating and cost planning provide the framework for predictability, cost control, and risk management throughout the lifecycle of a project. A proper cost estimating and cost planning framework, irrespective of project value and/or project complexity, helps to ensure a project is delivered on time, on budget, and at the highest quality with the lowest risk. Should it be requested, we are able to leverage Cumming Group’s world-renowned
cost estimating and cost analytics team to plug-in your entire program costs to predict contract capacity shortages, local targeted worker labor shortages, cashflow projections, and fiscal year-end spending acceleration for City Management.
In addition to understanding supply and demand market
conditions for labor and construction materials, our cost estimating services include the evaluation of project elements before drawings are complete. Our years of experience and extensive portfolio of projects provides us with the knowledge and insight to offer the City confidence in the cost management process and to deliver value.
Our approach to construction cost estimating is guided by three principles:
1. Anticipating costs by understanding the building program, risk, and the design development process.
2. Forecasting future costs, market conditions, and risk.
3. Communicating with a report format that is understood by people with varying degrees of familiarity with design and construction.
Our team’s programming and building systems cost model
estimates will be prepared at the conceptual and programming phases. Expanded estimate details and formats will be provided at design milestone phases. Construction estimates will include itemized quantities, units of measure, unit costs, and total dollar value for each line item and shall be coded following the CSI format (Uniformat can be preferred for early scoping budgets on design-build, CMAR, and P3 project deliveries).
Estimates will be formatted to allow development and transfer into a schedule of values and resource loaded construction schedule. Estimates for general contractor costs will be based on construction duration and project specific staffing and general requirements.
General contractor costs for fees, bonds, and insurances shall be itemized separately. The construction estimate will include cost escalation calculated to the mid-point of construction. Our thorough understanding of City soft costs, including consultant fees, jurisdiction review fees, inspection fees, contract administration fees, project technical support fees, contract compliance costs, and City project management costs, ensures that project budgets will be right-sized.
Estimate reports will include a level of detail to facilitate an understanding of project construction costs and risk. Estimates of construction cost will be reconciled with available budgets and independent estimates at each submittal phase.
Construction Market Studies
Identifying the key current market conditions in the project location and economic drivers are an important factor in providing an accurate estimate. Our in-house economist
constantly studies the market and keeps Cumming up to date on drivers affecting the construction industry locally, as well as macroeconomic factors that impact construction regionally and nationally.
We publish a quarterly economic newsletter (Cumming Insights) to keep all team members informed on current cost drivers.
At the start of every project, we prepare a local market report where we research the local construction market to gain insight on what is driving prices in that market. By studying the local construction market and upcoming work forecasts for the region, we are able to determine how busy the market STEP (Standardized Target Estimating Process) Timeline
cumming-group.com Page 684 of 1021 46 City of Hermosa Beach | City Yard Project (ultimately, the subcontractor base) is and how that will impact both labor and material resources for any given market. We identify contractor resources available for the project, study the ability of the available labor pool to perform the work, and determine where outside labor will come from if required.
In addition to local factors, Cumming Group currently tracks key national and regional trends on a monthly basis, including the U.S. dollar exchange rate, cost of energy, global demand, key material prices, construction volume, and labor availability.
This information is published in a monthly economic report and applied to current crew-based databases. Cumming Group has developed a crew-based database that utilizes current local labor rates, labor productivity issues, workers compensation rates, sales tax, subcontractor’s mark-ups, and material pricing.
We realize that every project is unique and requires special consideration. In addition, when current events impact the construction industry, our team will research the dynamics of that impact to determine the cost considerations for your projects.
Cutting Edge Tools and Techniques
Cumming Group’s cost management team is skilled in the
use of a variety of industry software and quantity analysis platforms which assist them in the preparation of cost models, and also to generate detailed, accurate and traceable quantity measurements.
We use electronic tools to support our estimates with
illustrations and graphics to visually confirm scope included (or excluded) from estimates and other key breakouts. We don’t expect our clients and design team to read through each page of our comprehensive estimates, so we use effective summaries and charts to visually show information at a
glance. Representative electronic tools include On-Screen Takeoff (OST), CostX, and REVIT model quantity extraction for BIM. Additionally, Cumming Group can provide clients with planning and scheduling services for all project phases, from development and pre-design through construction
closeout. Cumming Group also embraces technology where
we are convinced it adds value to our clients such as the BIM Revolution. We have experts who use specialist software such as REVIT, and who have sat with architects to discuss means of ensuring that the estimator can use the tools to confidently, quickly and accurately extract information.
We are not constrained by the limitations of packaged
estimating software – our clients’ needs are so varied and diverse that we use Excel to create a customized estimate for each client. We will adapt to your financial chart of accounts.
Value Engineering
More than a mere cost-reducing exercise, value engineering can provide owners with alternatives to the designed systems that may prove more cost effective, easier to use, and more sustainable. Because of this, we strongly recommend employing Value Engineering practices throughout the project. Our team does not see Value Engineering as a one-time event, but a strategy that is employed throughout the entire design process. While Value Engineering can be, and often is, provided as a standalone service, it is even more cost effective when performed in conjunction with our cost estimating services.
When the estimators are working on the project estimates, they will already be familiar with the project, the costs, and areas of concern. In essence, the Value Engineering reviewer will not be coming in cold and is able to provide Value Engineering services “in real time” as we concurrently estimate the project.
Change Management
Utilizing our expertise in various PMIS systems, we will keep tight control over all contract changes as they occur - whether it is a consultant contract, construction contract, or any other service provider contract. We try to minimize the need for change orders through scope management to prevent scope creep, and through quality assurance/quality control of the bidding documents. If changes are needed, we first confirm the contractor is entitled to a change and then estimate its value given the current job conditions.
Identify and Track Changes to the Work and Schedule
We will first provide an opinion of merit and then assign a change reason (unforeseen condition, errors and omissions, tenant requested change, code change, etc.). These potential change items will be tracked on a change log maintained by the Project Manager. We will include these change items along with anticipated future change items on an exposure log to most accurately depict the potential project budget status at any given time. The change log and exposure log will be uploaded to the project management controls system and be available at any time to the project team.
Prepare and Submit Change Orders in the City’s Format
Once the change is validated and negotiated with the
Contractor, our team will provide a recommendation for change approval to the City. We will make sure that the person with the correct signature authority reviews and signs off on the change. We will enter the change utilizing the City approved forms and format and deliver a final change packet containing the change order and all relevant backup information including the schedule with any potential impacts, the change order log indicating amount of total changes and remaining budget, all change proposals including negotiations and notes, and a lessons learned document that will be added to the issues and lessons learned database.
cumming-group.com Page 685 of 1021 47 City of Hermosa Beach | City Yard Project Experience with working within the design+ bid+ build and progressive design- build project delivery models.
5.10 – EXPERIENCE WORKING WITH DESIGN-BID-BUILD AND PROGRESSIVE DESIGN-BUILD DELIVERY MODELS Many of the projects listed in Section 5.4 – Relevant Project Experience were delivered using design-bid-build and through collaborative delivery methods like CMAR, Design-Build, Public-Private-Partnership, JOC, and Progressive Design-Build. The following chart shows a list of similar public agency projects completed over the last 10 years or currently in progress.
Project Name Market Sector Total Project Cost
Type Delivery Method Scope of Services New Construction Renovation Design-Build Design-Bid-Build Job Order Contracting (JOC) Construction Management At-Risk (CMAR) Public-Private-Partnership (P3) Project Management Planning, Programming, and Feasibility Design Management Bid Coordination and Management Construction Management Project Closeout Constructability Reviews Value Engineering Cost and Budget Management Schedule ManagementQuality Assurance / Quality ControlDocument ControlCost EstimatingClaims ManagementLEED/Envision Certification Healthcare
Harbor UCLA Medical Center Master Plan Implementation Healthcare $1.7B ● ● ● ● ● ● ● ● ● ● ● ● ● ● General Hospital and West Campus Redevelopment Housing $1B ● ● ● ● ● ● ● ● ● ● ● ● ● ● Rancho Los Amigos Hospital Consolidation Healthcare $402M ● ● ● ● ● ● ● ● ● ● ● ● LAC+USC Restorative Care Village Housing $150M ● ● ● ● ● ● ● ● ● ● ● Rancho Los Amigos RCC / RTP Housing $59M ● ● ● ● ● ● ● ● ● ● ● DHS/DMH Multiple Restorative Care Village Housing Housing $44M ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● Olive View SB1953 Facility Seismic Upgrade Project Healthcare $33M ● ● ● ● ● ● ● ● ● ● ● ● ● ● 442 Crocker Health Hub - DHS Housing $18M ● ● ● ● ● ● ● ● ● ● ● ● ● ● Pathway Torrance Community Health & Wellness Center Healthcare $16.5M ● ● ● ● ● ● ● ● Olive View Gastrointestinal Renovation Project Healthcare $15M ● ● ● ● ● ● ● ● ● ● ● ● ● ● Olive View Emergency Power Upgrades Healthcare $4.5M ● ● ● ● ● ● ● ● ● ● ● ● ● Pacoima Health Clinic Upgrades Healthcare $3.7M ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● Olive View Wireless Access Points and Code Blue Stations Healthcare $2M ● ● ● ● ● ● ● ● ● ● ● ● ● LAC+USC Kitchen Improvements Healthcare $2M ● ● ● ● ● ● ● ● ● ● ● ● ● LAC+USC Boiler Replacement Healthcare $2M ● ● ● ● ● ● ● ● ● ● ● ● ● Olive View Medical Center HR Building Replacement Healthcare $1.5M ● ● ● ● ● ● ● ● ● ● ● ● ● Rancho Los Amigos Talyst Pharmacy Installation Healthcare $1.5M ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● Government Buildings and Public Safety
Restorative Justice Village Master Plan Housing TBD ● ● ● ● ● ● ● ● Greater DTLA Strategic Real Estate Investment Plan Office TBD ● ● ● ● ● ● ● ● Civic Center Master Plan Update Office TBD ● ● ● ● ● ● ● ● Hall of Administration Seismic Retrofit Office $700M ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● cumming-group.com Page 686 of 1021 48 City of Hermosa Beach, Request for Qualifications Project Name Market Sector Total Project Cost
Type Delivery Method Scope of Services New Construction Renovation Design-Build Design-Bid-Build Job Order Contracting (JOC) Construction Management At-Risk (CMAR) Public-Private-Partnership (P3) Project Management Planning, Programming, and Feasibility Design Management Bid Coordination and Management Construction Management Project Closeout Constructability Reviews Value Engineering Cost and Budget Management Schedule ManagementQuality Assurance / Quality ControlDocument ControlCost EstimatingClaims ManagementLEED/Envision Certification Rancho Los Amigos South Campus Project Office $468M ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● James A. Musick Jail Facility Expansion Public Safety $320M ● ● ● ● ● ● ● ● ● ● ● ● MacLaren Housing and Mixed Use Redevelopment Housing $300M ● ● ● ● ● ● ● Alcazar Yards/Central Juvenile Hall Redevelopment Public Safety $250M ● ● ● ● ● ● ● ● ● ● Hall of Justice Repair and Reuse Public Safety $230M ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● San Pedro Courthouse Redevelopment Housing $150M ● ● ● ● ● ● ● ● ● ● ● County Data Center Office $150M ● ● ● ● ● ● ● ● ● ● ● ● ● ● Adams and Grand Master Plan Update Housing $125M ● ● ● ● ● ● ● ● Metropolitan State Hospital - Permanent Supportive Housing Housing $50M ● ● ● ● Los Angeles County Emergency Operations Center Renovation Public Safety $44.5M ● ● ● ● ● ● ● ● Campus Kilpatrick Replacement Public Safety $42M ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● East LA Sheriff Public Safety $39M ● ● ● ● ● ● ● ● ● ● ● ● West Hollywood - Holloway Interim Housing Program Housing $30M ● ● ● ● ● West Hollywood Historic Log Cabin Office $20M ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● 3965 Vermont Renovation Office $20M ● ● ● ● ● ● ● ● ● ● West Hollywood City Playhouse Cultural $20M ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● West Hollywood Fire Station Public Safety $20M ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● 611 N Brand - DCFS Office $15M ● ● ● ● ● ● ● ● ● ● ● ● ● ● 3501 Sepulveda - DCFS Office $13M ● ● ● ● ● ● ● ● ● ● ● ● ● ● Probation Security Enhancements Public Safety $12M ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● Murrieta Library Expansion Libraries $10M ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● 900 Corporate - DCFS Office $9M ● ● ● ● ● ● ● ● ● ● ● ● ● ● Murrieta Innovation Center Office $7.5M ● ● ● ● ● ● ● ● ● ● ● Carson Sheriff's Station Renovation Public Safety $5.4M ● ● ● ● ● ● ● ● ● ● ● 39115 Trade Center Office $5.4M ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● 13415 Carmenita Office $4.7M ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● 3303 Broadway Office $4.3M ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● 1000 Fremont Remodel - DHS Office $4M ● ● ● ● ● ● ● ● ● ● ● ● ● ● cumming-group.com Page 687 of 1021 49 City of Hermosa Beach, Request for Qualifications Project Name Market Sector Total Project Cost
Type Delivery Method Scope of Services New Construction Renovation Design-Build Design-Bid-Build Job Order Contracting (JOC) Construction Management At-Risk (CMAR) Public-Private-Partnership (P3) Project Management Planning, Programming, and Feasibility Design Management Bid Coordination and Management Construction Management Project Closeout Constructability Reviews Value Engineering Cost and Budget Management Schedule ManagementQuality Assurance / Quality ControlDocument ControlCost EstimatingClaims ManagementLEED/Envision Certification 1294 W Sixth St - DMH Office $3.4M ● ● ● ● ● ● ● ● ● ● ● ● ● ● AC Bilbrew Library Refurbishment Library $3.4M ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● Julian Dixon Library Renovations Library $3.2M ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● San Gabriel Library Refurbishment Library $3M ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● Rosemead Library Libraries $3M ● ● ● ● ● ● ● ● ● ●
El Monte Library Libraries $3M ● ● ● ● ● ● ● ● ● ●
611 N Brand - Public Health Office $2.3M ● ● ● ● ● ● ● ● ● ● ● ● ● ● 12440 Imperial - Sheriff's Dept LARICS Public Safety $2M ● ● ● ● ● ● ● ● ● ● ● ● ● ● 12440 Imperial - Sheriff's Dept BODY WORN CAMERA Public Safety $1.9M ● ● ● ● ● ● ● ● ● ● ● ● ● ● 39115 Trade Center - DMH Office $1.6M ● ● ● ● ● ● ● ● ● ● ● ● ● ● 12440 Imperial - Public Works Office $1M ● ● ● ● ● ● ● ● ● ● ● ● ● ● Parks and Recreation
Victoria Golf Course Redevelopment Parks & Recreation $300M ● ● ● ● ● ● ● ● ● ● ● ● Long Beach Drake Chavez Park Parks & Recreation $100M ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● 92nd Street Linear Park Parks & Recreation $50M ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● Eaton Fire Recovery Parks & Recreation $50M ● ● ● ● ● ● ● ● ● ● San Gabriel Valley Aquatics Center Parks & Recreation $34M ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● MacLaren Community Park Parks & Recreation $15M ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● West Hollywood - Plummer Park Comprehensive Plan Parks & Recreation $13M ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● Stoneview Nature Center Parks & Recreation $10M ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● West Hollywood AIDS Monument Parks & Recreation $10M ● ● ● ● ● ● ● ● ● ● ● Nogales Park and Stormwater Project Parks & Recreation $9.3M ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● Long Beach San Gabriel River Jump Start Parks & Recreation $8M ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● Hughes Fire Recovery Parks & Recreation $8M ● ● ● ● ● ● ● ● ● ● West Hollywood - Hart Park ADA Improvements and Dog Park Parks & Recreation $8M ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● Long Beach Willow Springs Parks & Recreation $7M ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● Helen Keller Park Community Center Parks & Recreation $7M ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● Lennox Park Pool Parks & Recreation $4.5M ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● cumming-group.com Page 688 of 1021 50 City of Hermosa Beach, Request for Qualifications Project Name Market Sector Total Project Cost
Type Delivery Method Scope of Services New Construction Renovation Design-Build Design-Bid-Build Job Order Contracting (JOC) Construction Management At-Risk (CMAR) Public-Private-Partnership (P3) Project Management Planning, Programming, and Feasibility Design Management Bid Coordination and Management Construction Management Project Closeout Constructability Reviews Value Engineering Cost and Budget Management Schedule ManagementQuality Assurance / Quality ControlDocument ControlCost EstimatingClaims ManagementLEED/Envision Certification Bethune Park Pool Parks & Recreation $3.2M ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● Normandie and 95th Street Park Parks & Recreation $2M ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● Val Verde Pool Parks & Recreation $1.5M ● ● ● ● ●
Hart Park Zoo Parks & Recreation TBD ● ● ● ● ● ●
Facility Reinvestment Programs / Deferred Maintenance
LA County Internal Services Department FRP Program All $750M ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● HOA Fire Protection DM Repairs Office $20M ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● Public Works Headquarters Office $5.7M ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● Lomita Sheriff Station Public Safety $3.3M ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● Van Nuys Admin Center T.I., MEP System Replacements Infrastructure $3.3M ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● McCourtney Complex Public Safety $3M ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● CRDF Campus Roof Replacements Office $2.8M ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● Scientific Services Bureau Lab Roof Replacement Office $2.4M ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● East LA Sheriff Station & COPS Bldg Public Safety $2M ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● El Segundo Yard Infrastructure $1.5M ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● Saticoy Yard Infrastructure $1.1M ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● BRTC SEB Elevator Replacement Office $1M ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● Public Works Ancillary Glass Project Deferred Maintenance $1M ● ● ● ● ● ● ● ● ● ● ● ● ● ● Spray Booth Replacement Lower Yard Infrastructure $300,000 ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● Generator Replacement Lower Yard Infrastructure $300,000 ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● Infrastructure, Transportation, Water
LAX Midfield Satellite Concourse Transportation $1.6B ● ● ● ● ● ● ● ● ● ● ● ● ● Cogswell Reservoir Post-Fire Emergency Restoration Project Infrastructure $180M ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● San Gabriel Reservoir Post-Fire Emergency Restoration Proj. Infrastructure $143M ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● Port of LA ICTF Transportation $131M ● ● ● ● ● ● ● ● ● ● ● ● ● ● Multiple Port and Harbor Projects (Port of Long Beach) Transportation $62M ● ● ● ● ● ● ● ● ● ● ● ● ● Santa Anita Reservoir Post Fire Emergency Restoration Proj. Infrastructure $57M ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● Eaton Wash Dam Post-Fire Emergency Project Infrastructure $50M ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● cumming-group.com Page 689 of 1021 51 City of Hermosa Beach, Request for Qualifications Project Name Market Sector Total Project Cost
Type Delivery Method Scope of Services New Construction Renovation Design-Build Design-Bid-Build Job Order Contracting (JOC) Construction Management At-Risk (CMAR) Public-Private-Partnership (P3) Project Management Planning, Programming, and Feasibility Design Management Bid Coordination and Management Construction Management Project Closeout Constructability Reviews Value Engineering Cost and Budget Management Schedule ManagementQuality Assurance / Quality ControlDocument ControlCost EstimatingClaims ManagementLEED/Envision Certification Pier G ITS Terminal Transportation $30M ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● Oxford Retention Basin Enhancements Water $14M ● ● ● ● ● ● ● ● ● ● ● ● ● Park to Playa Pedestrian Bridge and Trail Transportation $13M ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● Naples Island Pump Stations Rehabilitation - Phase I and II Water $11.3M ● ● ● ● ● ● ● ● ● ● ● Sun Valley Watershed Upper Storm Drain System, Phase 1 Water $9.4M ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● Walnut Park Pocket Park and Stormwater Project Water $9.3M ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● Project No. 5241 - Reinforced Concrete Box Reconstruction Water $8.9M ● ● ● ● ● ● ● ● ● ● ● Dominguez Pump Station Rehabilitation Water $7.7M ● ● ● ● ● ● ● ● ● ● ● Cogswell Dam Inlet - Outlet Works Rehabilitation Project Infrastructure $7.5M ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● South Whittier Sunshine Acres - Leland Avenue Transportation $6.7M ● ● ● ● ● ● ● ● ● ● Alamitos Bay Pump Station - Discharge Line Replacement Water $5.7M ● ● ● ● ● ● ● ● ● ● ● Huntington Drive - San Gabriel Blvd Transportation $5.2M ● ● ● ● ● ● ● ● ● Helen Keller Park Landfill Remediation Infrastructure $5.2M ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● Boone Olive Pump Station Upgrade Project Water $4.7M ● ● ● ● ● ● ● ● ● ● ● Morris Dam Access Road and San Gabriel Dam Outlet Infrastructure $3.7M ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● Malibu Branch Feeder 30-inch Realignment Water $3.5M ● ● ● ● ● ● ● ● ● ● Hacienda Channel - La Plata Avenue Drain Infrastructure $2.3M ● ● ● ● ● ● ● ● ● ● Firestone Metro Blue Line Station and Bikeway Improvements Transportation $2M ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● Santa Monica Canyon Channel Rubber Dam Water $2M ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● Hancock Park Pit 91 Drainage Water $2M ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● Saybrook Medians Phase III Infrastructure $1.5M ● ● ● ● ● ● ● ● ● ● Prairie Avenue TSSP - 118th Street to Redondo Beach Blvd Transportation $610,000 ● ● ● ● ● ● ● ● ● ● cumming-group.com Page 690 of 1021 52 City of Hermosa Beach, Request for Qualifications The firm’s history of compliance with federal, state and local laws, rules and regulations.
5.11 – HISTORY OF COMPLIANCE WITH FEDERAL,
STATE, AND LOCAL LAWS AND REGULATIONS
As discussed earlier, Cumming Group has extensive experience dealing with CEQA, NEPA, AQMD, and RWQCB to successfully complete projects with complex environmental issues. In addition to our experience dealing with these laws and
regulations, Cumming Group is a leader at requiring their staff complete OSHA-10 and OSHA 30-hour training to make for
better and safer workplaces and construction sites.
From a corporate standpoint, there are no current compliance issues with any Federal, State, or Local laws and regulations.
Cumming Group is in good standing with the California
Secretary of State and has no history of compliance issues at any level of government.
The firm’s experience and familiarity with the governmental and quasi- governmental entities that will have jurisdiction over the Project and their requirements.
5.12 – FAMILIARITY WITH AUTHORITIES HAVING
JURISDICTION
Understanding the role of the other government agencies having jurisdiction over a project is critical in the selection of the project delivery method. This is critical to minimizing the schedule impacts to a project. Cumming Group has coordinated projects with the gamut of County, City, State, and Federal jurisdictions.
Cumming Group is adept at coordinating large and small
projects with various other local jurisdictions and stakeholders.
We have managed projects for local agencies that have required coordination with the following jurisdictions: South Coast Air Quality Management District (SCAQMD) for the installation of generators at Public Works’ maintenance yards and multiple demolition and abatement projects; the Los Angeles Regional Water Quality Control Board (RWQCB) for the groundwater monitoring of former Leaking Underground Storage Tanks
at Rancho Los Amigos South Campus; County of Los Angeles Public Health (DPH) for the construction of swimming pools and kitchen projects at Stoneview Nature Center and the Hall of Justice Cafeteria; California Department of Transit (DOT) for the installation of various modular buildings; FEMA/CalEMA for the Eaton Fire recovery at several County Parks and Recreation facilities; and the Board of State and Community Corrections (BSCC) and the California Department of Corrections and Rehabilitation (CDCR) for work at prisons and juvenile detention facilities. We have experience with most local jurisdictional agencies and professional relationships with dozens of other specialty jurisdictions that have jurisdiction over Southern California projects.
With the numerous collaboration efforts Cumming Group has with these agencies, we will be a strong advocate for the City on this project.
Complete listing of any public or private construction projects for which the firm has been declared in default.
5.13 – LIST OF PROJECTS THAT THE FIRM HAS BEEN
DECLARED IN DEFAULT
Cumming Group has never had a contract terminated for cause or been declared in default.
Any services the firm proposes to perform through a subconsultant.
5.14 – SERVICES BY SUBCONSULTANTS
As described in Section 2 – Firm Profile, Cumming Group has the depth of resources and comprehensive services offered in-house to ensure that we will be able to address any of the City’s needs throughout the course of the project. Our services align with the scope of services outlined in the City’s Request for Qualifications. Therefore, we have not proposed any subconsultants for this contract.
cumming-group.com Page 691 of 1021 53 City of Hermosa Beach | City Yard Project SECTION 6
Project Management Plan
6.1 Providing Effective Oversight Through the Life of the Project Within the Framework of Responsibility, Accountability, and Transparency
6.2 Establishing Project Controls and Deliverables
6.3 Establishing Schedules and Milestones
6.4 Day-to-Day Project Management, Technical Advice, Documentation, and Communication Protocols
6.5 Establishing an Effective QA/QC Program