Cities Index.
Agenda packet

Laguna Hills City Council
October 14, 2025

Document
Agenda packet
Meeting
October 14, 2025
Body
Laguna Hills City Council
Pages
1,035
Original file
109.3 MB
Text extracted from the city's file for reading and search. Open the original on lagunahillsca.api.civicclerk.com. That file is the official record.

45 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category Category
Building Interior - Cabinets/Counters
Placed In Service
Useful Life
Remaining Life
Replacement Year
070 Building Interior
07/2002
30 9
2032-33
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
1 total
$249,900.00
100.00%
$249,900.00
$326,062.82
$0.00
$886.51
$3.92
$890.43
2nd FLOOR CLASSROOMS:
59 lin. ft. of laminated base cabinets @ $800.00 = $47,200.00 63 lin. ft. of laminated wall cabinets @ $750.00 = $47,250.00 59 lin. ft. of laminated counters @ $325.00 = $19,175.00 1st FLOOR LOBBY/HALL:
45 lin. ft. of laminated base cabinets @ $800.00 = $36,000.00 45 lin. ft. of granite counters @ $400.00 = $18,000.00
GYM/DANCE STUDIO:
25 lin. ft. of laminated base cabinets @ $800.00 = $20,000.00 12 lin. ft. of laminated wall cabinets @ $750.00 = $9,000.00 25 lin. ft. of laminated counters @ $325.00 = $8,125.00 HERITAGE ROOM(S):
22 lin. ft. of laminated base cabinets @ $800.00 = $17,600.00 22 lin. ft. of laminated wall cabinets @ $750.00 = $16,500.00 34 lin. ft. of laminated counters @ $325.00 = $11,050.00 TOTAL = $249,900.00

11.8.2023(1) Advanced Reserve Solutions, Inc.

Page 433 of 570 ends

46 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category These are fiberboard ceiling panels:

Category
Building Interior - Ceiling Panels
Placed In Service
Useful Life
Remaining Life
Replacement Year
070 Building Interior
07/2002
30 9
2032-33
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
11,389 sq. ft.
$4.50
100.00%
$51,250.50
$66,870.28
$0.00
$181.81
$0.80
$182.61
2nd Floor Classrooms 1,125 sq. ft.
2nd Floor Hall 2,108
1st Floor Hall/Lobby 2,974
Dance Studio 1,591
Kitchen 891
Heritage Room(s) 2,700
11,389 sq. ft.

11.8.2023(1) Advanced Reserve Solutions, Inc.

Page 434 of 570 ends

47 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category These Halsey Taylor wall mounted stainless steel fountains with bottle fillers were replaced in 2022.

Category
Building Interior - Drinking Fountains, 2022
Placed In Service
Useful Life
Remaining Life
Replacement Year
070 Building Interior
07/2022
25 24
2047-48
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
2 fountains
$6,000.00
100.00%
$12,000.00
$24,393.53
$0.00
$15.92
$0.07
$15.99

11.8.2023(1) Advanced Reserve Solutions, Inc.

Page 435 of 570 ends

48 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category These are wall mounted stainless steel fountains.

Category
Building Interior - Drinking Fountains, Original
Placed In Service
Useful Life
Remaining Life
Replacement Year
070 Building Interior
07/2002
25 4
2027-28
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
4 fountains
$6,000.00
100.00%
$24,000.00
$27,012.21
$0.00
$191.76
$0.85
$192.60

11.8.2023(1) Advanced Reserve Solutions, Inc.

Page 436 of 570 ends

49 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category The actual date this component was placed into service is not available. For budgeting purposes, this date has been estimated based on its condition at our most recent site visit.

Category
Building Interior - Floor, Carpet
Placed In Service
Useful Life
Remaining Life
Replacement Year
070 Building Interior
07/2014
10 1
2024-25
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
1,059 sq. yds.
$100.00
107.00%
$113,313.00
$116,712.39
$0.00
$3,623.61
$16.03
$3,639.64
The measurement indicated represents the actual area to be replaced. The percentage of replacement has been increased above 100% to allow for a waste factor which should be considered when replacing this component. 1st floor common areas 51
Heritage room(s) 508 sq. yds.
2nd floor + meeting room 500
1,059 sq. yds.

11.8.2023(1) Advanced Reserve Solutions, Inc.

Page 437 of 570 ends

50 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category Category
Building Interior - Floor, Ceramic Tile
Placed In Service
Useful Life
Remaining Life
Replacement Year
070 Building Interior
07/2002
30 9
2032-33
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
1 total
$331,450.00
103.00%
$341,393.50
$445,441.08
$0.00
$1,211.08
$5.36
$1,216.44
The measurement indicated represents the actual area to be replaced. The percentage of replacement has been increased above 100% to allow for a waste factor which should be considered when replacing this component.

The cost for this component includes the removal and disposal of the existing material. 1st FLOOR:
5,711 sq. ft. of floor tile, lobby @ $35.00 = $199,885.00 891 sq. ft. of floor tile, kitchen @ $35.00 = $31,185.00 1,290 sq. ft. of floor tile w/travertine accents @ $70.00 = $90,300.00 2nd FLOOR:
288 sq. ft. of floor tile @ $35.00 = $10,080.00
TOTAL = $331,450.00

11.8.2023(1) Advanced Reserve Solutions, Inc.

Page 438 of 570 ends

51 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category Category
Building Interior - Floor, Vinyl Tile
Placed In Service
Useful Life
Remaining Life
Replacement Year
070 Building Interior
07/2002
25 4
2027-28
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
1 total
$45,900.00
103.00%
$47,277.00
$53,210.68
$0.00
$377.74
$1.67
$379.41
The measurement indicated represents the actual area to be replaced. The percentage of replacement has been increased above 100% to allow for a waste factor which should be considered when replacing this component.

The cost for this component includes the removal and disposal of the existing material. 2nd FLOOR CLASSROOMS:
1,935 sq. ft. of floor tile @ $20.00 = $38,700.00
STAIRWELL:
360 sq. ft. of floor tile @ $20.00 = $7,200.00
TOTAL = $45,900.00

11.8.2023(1) Advanced Reserve Solutions, Inc.

Page 439 of 570 ends

52 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category Category
Building Interior - Floor, Wood
Placed In Service
Useful Life
Remaining Life
Replacement Year
070 Building Interior
07/2002
30 9
2032-33
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
1 total
$661,080.00
103.00%
$680,912.40
$888,436.24
$0.00
$2,415.51
$10.69
$2,426.20
The measurement indicated represents the actual area to be replaced. The percentage of replacement has been increased above 100% to allow for a waste factor which should be considered when replacing this component.

The cost for this component includes the removal and disposal of the existing material. 1st FLOOR:
13,936 sq. ft. of wood floor, gym @ $40.00 = $557,440.00 1,591 sq. ft. of wood tile, dance studio @ $40.00 = $63,640.00 1,000 sq. ft. of wood floor, stage @ $40.00 = $40,000.00 TOTAL = $661,080.00

11.8.2023(1) Advanced Reserve Solutions, Inc.

Page 440 of 570 ends

53 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category During our March 2008 site visit we observed office furniture, classroom type furniture and banquet furniture at the community center. We anticipate this furniture will be replaced on an as-needed basis and have therefore excluded budgeting for it in this analysis.

Category
Building Interior - Furniture, Unfunded
Placed In Service
Useful Life
Remaining Life
Replacement Year
070 Building Interior
07/2002
n.a.
n.a.
n.a.

Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
1 comment
$0.00

0.00%
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00

11.8.2023(1) Advanced Reserve Solutions, Inc.

Page 441 of 570 ends

54 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category These are Porter regulation style electric basketball assemblies with glass backboards.

Category
Building Interior - Gym, Basketball Backboards
Placed In Service
Useful Life
Remaining Life
Replacement Year
070 Building Interior
07/2002
30 9
2032-33
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
6 backboards
$12,500.00
100.00%
$75,000.00
$97,857.99
$0.00
$266.06
$1.18
$267.24

11.8.2023(1) Advanced Reserve Solutions, Inc.

Page 442 of 570 ends

55 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category These are wood telescoping bleachers:

Category
Building Interior - Gym, Bleachers
Placed In Service
Useful Life
Remaining Life
Replacement Year
070 Building Interior
07/2002
35 14
2037-38
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
1 total
$130,000.00
100.00%
$130,000.00
$196,636.66
$0.00
$296.17
$1.31
$297.48
2 - 36' x 11 rows @ $40,000.00 = $80,000.00
2 - 48' x 4 rows @ $25,000.00 = $50,000.00
TOTAL = $130,000.00

11.8.2023(1) Advanced Reserve Solutions, Inc.

Page 443 of 570 ends

56 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category During our October 2023 on site visit we observed the following commercial kitchen equipment:
63 lin. ft. of stainless steel tables/sinks
1 - Wolf commercial 6-burner range/oven
1 - 4' x 7' commercial range hood
1 - Wolf commercial griddle
1 - Champion commercial dishwasher
1 - ISE commercial garbage disposer
1 - Marley air door
1 - Randell freezer
1 - Beverage-Aire 3-door refrigerator
1 - Ice-O-Matic large ice maker
3 - Wells warming wells
2 - Crescor warming racks
1 - Randell refrigerated sandwich table
1 - Savory commercial toaster
We anticipate this equipment will be replaced/added to through time and therefore have budgeted a general provision for this equipment over a 15-year period.

Category
Building Interior - Kitchen Equipment
Placed In Service
Useful Life
Adjustment
Remaining Life
Replacement Year
070 Building Interior
07/2002
20 +2
1 2024-25
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
1 provision
$80,000.00
100.00%
$80,000.00
$82,400.00
$0.00
$2,558.30
$11.32
$2,569.62

11.8.2023(1) Advanced Reserve Solutions, Inc.

Page 444 of 570 ends

57 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category Category
Building Interior - Restroom Remodel, Floor 1
Placed In Service
Useful Life
Remaining Life
Replacement Year
070 Building Interior
07/2002
30 9
2032-33
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
1 total
$513,710.00
100.00%
$513,710.00
$670,275.03
$0.00
$1,822.36
$8.06
$1,830.43
RESTROOM PARTITIONS:
21 solid plastic stall partitions @ $4,500.00 = $94,500.00 6 solid plastic urinal dividers @ $2,000.00 = $12,000.00 PLUMBING FIXTURES:
21 toilets, flush valve @ $2,000.00 = $42,000.00
7 urinals, wall mount unit @ $2,000.00 = $14,000.00
22 sinks, counter oval @ $1,600.00 = $35,200.00
4 solid plastic shower dividers @ $3,500.00 = $14,000.00 COUNTERS:
89 lin. ft. of solid surface counters @ $450.00 = $40,050.00 WALL/FLOOR COVER:
3,540 sq. ft. of ceramic wall tile @ $40.00 = $141,600.00 2,256 sq. ft. of ceramic floor tile @ $35.00 = $78,960.00 CABINETS:
21 lin. ft. of laminated base cabinets @ $900.00 = $18,900.00 5 lin. ft. of laminated pantry cabinets @ $1,300.00 = $6,500.00 KITCHEN:
1 Small Restroom Remodel @ $16,000.00 = $16,000.00
TOTAL = $513,710.00

11.8.2023(1) Advanced Reserve Solutions, Inc.

Page 445 of 570 ends

58 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category Category
Building Interior - Restroom Remodel, Floor 2
Placed In Service
Useful Life
Remaining Life
Replacement Year
070 Building Interior
07/2002
30 9
2032-33
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
1 total
$89,460.00
100.00%
$89,460.00
$116,725.01
$0.00
$317.36
$1.40
$318.76
PLUMBING FIXTURES:
3 toilets, flush valve @ $2,000.00 = $6,000.00
1 urinal, wall mount unit @ $2,000.00 = $2,000.00
4 sinks, counter oval @ $1,600.00 = $6,400.00
RESTROOM PARTITIONS:
3 solid plastic stall partitions @ $4,500.00 = $13,500.00 1 solid plastic urinal divider @ $2,000.00 = $2,000.00
COUNTERS:
12 lin. ft. of solid surface counters @ $450.00 = $5,400.00 WALL/FLOOR COVER:
660 sq. ft. of ceramic wall tile @ $40.00 = $26,400.00
336 sq. ft. of ceramic floor tile @ $35.00 = $11,760.00 CLASSROOMS::
1 Small Restroom Remodel @ $16,000.00 = $16,000.00
TOTAL = $89,460.00

11.8.2023(1) Advanced Reserve Solutions, Inc.

Page 446 of 570 ends

59 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category These are large room dividers located in the Heritage Room(s) and measures approximately 55' x 16'.

Category
Building Interior - Room Partitions
Placed In Service
Useful Life
Remaining Life
Replacement Year
070 Building Interior
07/2002
22 1
2024-25
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
1 total
$98,000.00
100.00%
$98,000.00
$100,940.00
$0.00
$3,133.92
$13.87
$3,147.78
* These are large room dividers located in the Heritage Room(s) and measures approximately 55' x 16'. 2 large vinyl partitions, ballroom* @ $38,000.00 = $76,000.00 1 vinyl partition, classroom @ $22,000.00 = $22,000.00
TOTAL = $98,000.00

11.8.2023(1) Advanced Reserve Solutions, Inc.

Page 447 of 570 ends

60 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category Category
Building Interior - Wall, Ceramic Tile
Placed In Service
Useful Life
Remaining Life
Replacement Year
070 Building Interior
07/2002
30 9
2032-33
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
1 total
$230,340.00
103.00%
$237,250.20
$309,557.70
$0.00
$841.64
$3.72
$845.36
The measurement indicated represents the actual area to be replaced. The percentage of replacement has been increased above 100% to allow for a waste factor which should be considered when replacing this component.

The cost for this component includes the removal and disposal of the existing material. 1st FLOOR:
792 sq. ft. of wall tile, lobby @ $45.00 = $35,640.00
1,620 sq. ft. of wall tile, kitchen @ $45.00 = $72,900.00 2,220 sq. ft. of stone veneer @ $50.00 = $111,000.00
240 sq. ft. of wall tile, gym @ $45.00 = $10,800.00
TOTAL = $230,340.00

11.8.2023(1) Advanced Reserve Solutions, Inc.

Page 448 of 570 ends

61 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category Category
Building Interior - Wall, Wallpaper
Placed In Service
Useful Life
Remaining Life
Replacement Year
070 Building Interior
07/2002
25 4
2027-28
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
2,745 sq. ft.
$16.00
105.00%
$46,116.00
$51,903.96
$0.00
$368.46
$1.63
$370.09
The unit cost indicated represents the actual area to be replaced. The percentage of replacement has been increased above 100% to allow for a waste factor which should be considered when replacing this component.

The cost for this component includes the removal and disposal of the existing material. 2nd floor classrooms 1,125 sq. ft.

Heritage room(s) 1,620
2,745 sq. ft.

11.8.2023(1) Advanced Reserve Solutions, Inc.

Page 449 of 570 ends

62 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category These are motorized roller type window shades:

Category
Building Interior - Window Blinds
Placed In Service
Useful Life
Remaining Life
Replacement Year
070 Building Interior
07/2002
25 4
2027-28
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
1,809 sq. ft.
$45.00
100.00%
$81,405.00
$91,622.04
$0.00
$650.41
$2.88
$653.29
2nd Floor Classrooms 460 sq. ft.

Dance Studio 530
Heritage Room(s) 819
1,809 sq. ft.

11.8.2023(1) Advanced Reserve Solutions, Inc.

Page 450 of 570 ends

63 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category Category
Building Exterior - Doors
Placed In Service
Useful Life
Remaining Life
Replacement Year
080 Building Exterior
07/2002
30 9
2032-33
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
1 total
$163,500.00
100.00%
$163,500.00
$213,330.42
$0.00
$580.01
$2.57
$582.58
11 - 3' x 8' metal/glass doors @ $4,500.00 = $49,500.00 8 - 4' x 8' metal/glass doors @ $5,000.00 = $40,000.00
7 - 4' x 8' metal doors @ $4,000.00 = $28,000.00
4 - 3.5' x 8' metal/glass doors @ $4,750.00 = $19,000.00 4 - 3' x 8' metal doors @ $3,500.00 = $14,000.00
2 - 3.5' x 8' metal doors w/vents @ $4,000.00 = $8,000.00 1 - 6.5' x 9' metal roll up door @ $5,000.00 = $5,000.00 TOTAL = $163,500.00

11.8.2023(1) Advanced Reserve Solutions, Inc.

Page 451 of 570 ends

64 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category Category
Equipment - Audio/Video
Placed In Service
Useful Life
Remaining Life
Replacement Year
090 Equipment
07/2002
25 4
2027-28
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
1 total
$79,100.00
100.00%
$79,100.00
$89,027.75
$0.00
$632.00
$2.80
$634.79
The cost estimate for this component has been calculated based on the inventory identified herein. It is likely that future replacements will vary and, therefore, the cost used should be considered as a general indication of budgetary needs rather than specific to this inventory.
1 large roll-up movie screen @ $7,500.00 = $7,500.00
4 wall mounted speakers @ $600.00 = $2,400.00
5 x-large suspended speakers @ $4,000.00 = $20,000.00
4 large JBL speakers @ $2,000.00 = $8,000.00
27 in ceiling speakers @ $600.00 = $16,200.00
1 total, sound equipment package* @ $25,000.00 = $25,000.00 TOTAL = $79,100.00

11.8.2023(1) Advanced Reserve Solutions, Inc.

Page 452 of 570 ends

65 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category This is a Dual Lite Spectron LSN battery back-up power inverter system located in the rear mechanical room.

Category
Equipment - Back Up, Power Supply
Placed In Service
Useful Life
Remaining Life
Replacement Year
090 Equipment
07/2002
25 4
2027-28
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
1 total
$60,000.00
100.00%
$60,000.00
$67,530.53
$0.00
$479.39
$2.12
$481.51

11.8.2023(1) Advanced Reserve Solutions, Inc.

Page 453 of 570 ends

66 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category We have excluded budgeting at this time for the computer/office equipment and furnishings & fixtures located throughout the Community Center offices and classrooms. We anticipate this equipment will be replaced/upgraded on an as-needed basis and not all at one time.

Category
Equipment - Electronic/Office, Unfunded
Placed In Service
Useful Life
Remaining Life
Replacement Year
090 Equipment
07/2002
n.a.
n.a.
n.a.

Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
1 comment
$0.00

0.00%
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00

11.8.2023(1) Advanced Reserve Solutions, Inc.

Page 454 of 570 ends

67 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category This is a 3-floor hydraulic elevator.

We have budgeted a provision for refurbishing the interior of the elevator cabs to include laminated wall covering, ceramic floor cover, fluorescent lighting, etc.

The remaining life of this component has been extended due to its condition at our most recent site visit.

Category
Equipment - Elevator, Cab Refurbishing
Placed In Service
Useful Life
Adjustment
Remaining Life
Replacement Year
090 Equipment
07/2002
15 +11
5 2028-29
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
1 elevator
$15,000.00
100.00%
$15,000.00
$17,389.11
$0.00
$95.86
$0.42
$96.28
Note: costs should be considered general estimates.

11.8.2023(1) Advanced Reserve Solutions, Inc.

Page 455 of 570 ends

68 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category This is a 3-floor hydraulic elevator.

This component is for the additional major repair costs associated with hydraulic style elevators such as valve and cylinder replacements.

Category
Equipment - Elevator, Modernization
Placed In Service
Useful Life
Remaining Life
Replacement Year
090 Equipment
07/2002
30 9
2032-33
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
1 elevator
$250,000.00
100.00%
$250,000.00
$326,193.30
$0.00
$886.86
$3.92
$890.79

11.8.2023(1) Advanced Reserve Solutions, Inc.

Page 456 of 570 ends

69 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category This is a Silent Knight RPS-1000 fire control panel located in the rear mechanical room.

Category
Equipment - Fire Control Panels
Placed In Service
Useful Life
Remaining Life
Replacement Year
090 Equipment
07/2002
25 4
2027-28
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
1 panel
$36,500.00
100.00%
$36,500.00
$41,081.07
$0.00
$291.63
$1.29
$292.92
1 small notifier panel @ $4,000.00 = $4,000.00
1 large control panel, IFP-1000 @ $20,000.00 = $20,000.00 1 large panel, RPS-1000 @ $12,500.00 = $12,500.00
TOTAL = $36,500.00

11.8.2023(1) Advanced Reserve Solutions, Inc.

Page 457 of 570 ends

70 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category These are 80-100 gallon commercial, natural gas hot water boilers.

Category
Equipment - HVAC, Boilers
Placed In Service
Useful Life
Adjustment
Remaining Life
Replacement Year
090 Equipment
07/2002
16 +7
2 2025-26
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
2 boilers
$12,500.00
100.00%
$25,000.00
$26,522.50
$0.00
$399.65
$1.77
$401.42

11.8.2023(1) Advanced Reserve Solutions, Inc.

Page 458 of 570 ends

71 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category These are stainless steel heaters suspended in the gym ceiling.

Category
Equipment - HVAC, Heaters
Placed In Service
Useful Life
Remaining Life
Replacement Year
090 Equipment
07/2002
30 9
2032-33
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
8 heaters
$6,500.00
100.00%
$52,000.00
$67,848.21
$0.00
$184.47
$0.82
$185.28

11.8.2023(1) Advanced Reserve Solutions, Inc.

Page 459 of 570 ends

72 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category The HVAC units were replaced in 2020 for $411,000.

Category
Equipment - HVAC, Package Units
Placed In Service
Useful Life
Remaining Life
Replacement Year
090 Equipment
07/2020
16 13
2036-37
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
1 total
$528,000.00
100.00%
$528,000.00
$775,385.80
$0.00
$1,295.68
$5.73
$1,301.42
* This unit is located on the roof and serves the Mechanical room. 1 Carrier 12.5 ton unit @ $45,000.00 = $45,000.00
2 Carrier 6 ton units @ $32,500.00 = $65,000.00
5 Carrier 5 ton units @ $30,000.00 = $150,000.00
5 Carrier 7.5 ton units @ $37,500.00 = $187,500.00
1 Carrier mini split unit* @ $8,000.00 = $8,000.00
1 Sterling gas furnace @ $10,000.00 = $10,000.00
1 make up air unit @ $15,000.00 = $15,000.00
1 Carrier 15 ton unit @ $47,500.00 = $47,500.00
TOTAL = $528,000.00

11.8.2023(1) Advanced Reserve Solutions, Inc.

Page 460 of 570 ends

73 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category These are Loren Cook ventilation fans located on the roof:

Category
Equipment - HVAC, Ventilation Fans
Placed In Service
Useful Life
Adjustment
Remaining Life
Replacement Year
090 Equipment
07/2002
20 +5
4 2027-28
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
1 total
$44,000.00
100.00%
$44,000.00
$49,522.39
$0.00
$351.55
$1.56
$353.11
The remaining life of this component has been extended due to its condition at our most recent site visit. 4 large ventilation fans @ $4,500.00 = $18,000.00
4 x-large ventilation fans @ $6,500.00 = $26,000.00
TOTAL = $44,000.00

11.8.2023(1) Advanced Reserve Solutions, Inc.

Page 461 of 570 ends

74 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category The actual date this component was placed into service is not available. For budgeting purposes, this date has been estimated based on its condition at our most recent site visit.

Category
Equipment - Surveillance System
Placed In Service
Useful Life
Remaining Life
Replacement Year
090 Equipment
07/2020
10 7
2030-31
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
1 system
$40,000.00
100.00%
$40,000.00
$49,194.95
$0.00
$182.51
$0.81
$183.32

11.8.2023(1) Advanced Reserve Solutions, Inc.

Page 462 of 570 ends

75 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category This is a very large, elaborate water feature consisting of 4 precast concrete bowls that create a waterfall into small circular ponds. A trough measuring approximately 165' in length runs along the wall behind the "falls" emptying into a large pond. This feature is constructed of concrete, and decorative mosaic and ceramic tiles.

We have budgeted for a major rehab of this water feature on a 30-year cycle to include fountain repairs/replacements, replastering the base pools, tile replacement, lighting, equipment, etc. The actual condition of the fountain should be monitored through time and the estimates adjusted accordingly.

Category
Grounds - Fountain, Refurbish
Placed In Service
Useful Life
Remaining Life
Replacement Year
100 Grounds
07/2002
30 9
2032-33
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
1 fountain
$250,000.00
100.00%
$250,000.00
$326,193.30
$0.00
$886.86
$3.92
$890.79

11.8.2023(1) Advanced Reserve Solutions, Inc.

Page 463 of 570 ends

76 Laguna Hills Community Center
Component Detail
Directed Cash Flow Calculation Method; Sorted By Category Category
Grounds - Park Furnishings
Placed In Service
Useful Life
Remaining Life
Replacement Year
100 Grounds
07/2002
30 9
2032-33
Quantity
Unit Cost
% of Replacement
Current Cost
Future Cost
Assigned Reserves at FYB
Monthly Member Contribution
Monthly Interest Contribution
Total Monthly Contribution
1 total
$116,100.00
100.00%
$116,100.00
$151,484.17
$0.00
$411.86
$1.82
$413.68
23 - concrete planter pots (various sized) @ $1,200.00 = $27,600.00 8 - 4' x 4' concrete benches w/o backs @ $4,500.00 = $36,000.00 7 - concrete trash receptacles @ $2,000.00 = $14,000.00 7 - 7' concrete benches w/backs @ $5,500.00 = $38,500.00 TOTAL = $116,100.00

11.8.2023(1) Advanced Reserve Solutions, Inc.

Page 464 of 570 ends

77 Laguna Hills Community Center
Component Detail Index
Page
Building Exterior - Doors 63
Building Interior - Cabinets/Counters 45
Building Interior - Ceiling Panels 46
Building Interior - Drinking Fountains, 2022 47
Building Interior - Drinking Fountains, Original 48
Building Interior - Floor, Carpet 49
Building Interior - Floor, Ceramic Tile 50
Building Interior - Floor, Vinyl Tile 51
Building Interior - Floor, Wood 52
Building Interior - Furniture, Unfunded 53
Building Interior - Gym, Basketball Backboards 54
Building Interior - Gym, Bleachers 55
Building Interior - Kitchen Equipment 56
Building Interior - Restroom Remodel, Floor 1 57
Building Interior - Restroom Remodel, Floor 2 58
Building Interior - Room Partitions 59
Building Interior - Wall, Ceramic Tile 60
Building Interior - Wall, Wallpaper 61
Building Interior - Window Blinds 62
Concrete - Mastic, Unfunded 27
Concrete - Replacement 28
Equipment - Audio/Video 64
Equipment - Back Up, Power Supply 65
Equipment - Electronic/Office, Unfunded 66
Equipment - Elevator, Cab Refurbishing 67
Equipment - Elevator, Modernization 68
Equipment - Fire Control Panels 69
Equipment - HVAC, Boilers 70
Equipment - HVAC, Heaters 71
Equipment - HVAC, Package Units 72
Equipment - HVAC, Ventilation Fans 73
Equipment - Surveillance System 74
Fencing - Metal 39
Grounds - Fountain, Refurbish 75
Grounds - Park Furnishings 76
Lighting - Exterior, Building 41
Lighting - Exterior, Grounds, Newer 42
Lighting - Exterior, Grounds, Original 43
Lighting - Interior 44
Painting - Exterior 37
Painting - Interior 38
Roofs - Built Up, Coating, 2020 31
Roofs - Built Up, Coating, 2024 32
Roofs - Built Up, Replacement 33

11.8.2023(1) Advanced Reserve Solutions, Inc.

Page 465 of 570 ends

78 Laguna Hills Community Center
Component Detail Index
Roofs - Glass 34
Roofs - Skylights 35
Roofs - Tile 36
Streets - Asphalt, Major Rehab 29
Streets - Asphalt, Repair/Seal & Stripe 30
Walls - Masonry 40
50 Components

11.8.2023(1) Advanced Reserve Solutions, Inc.

Page 466 of 570 ends

FINAL REPORT

UPDATED CITYWIDE

PAVEMENT MANAGEMENT PLAN
OC Go
2024-2031
Submitted to:

City of Laguna Hills, CA
March 15, 2024

Page 467 of 570 ends

March 15, 2024
Mr. Joe Ames, P.E., T.E.

Public Works Director / City Engineer

CITY OF LAGUNA HILLS
24035 El Toro Road
Laguna Hills, CA 92653
Subject: City of Laguna Hills – OCTA Pavement Management Compliance Report 2024 Dear Joe:

As part of the 2024 Update of the Pavement Management Plan (PMP) for the City of Laguna Hills, Bucknam Infrastructure Group, Inc. is pleased to submit the PMP reporting required by the Orange County Transportation Authority (OCTA). This data/report will be submitted to OCTA as part of the City’s required biennial PMP prior to June 30, 2024.

The information contained in this report was used to develop the recommended improvement program for the pavement network. The report covers the following categories:
• Pavement Management Plan Certification
• Quality Assurance / Quality Control (QA/QC) Plan
• Pavement Management Data Files (electronic Laguna Hills.e70 file format) • Pavement Management Plan that includes the following:
• Average Pavement Conditions For Each Segment in the Network (PCI Report) The Pavement Condition Index report shows the present condition of each street in the pavement network (MPAH and Locals). In addition, the report shows the basic geometry of each street segment.
• Seven-year Projected PCI Under Existing Funding Levels This report identifies the projected PCI’s based on the local agencies current funding programs. This report details the PCI projects for the entire network, MPAH roadways and Local streets.
• Seven-year Plan for Road Maintenance and Rehabilitation (Forecasted Maintenance Report)
The Forecasted Maintenance Report projects the street maintenance activities required for the next seven years, broken down to show maintenance levels for all streets. This includes all scheduled projects provided by the City for fiscal years 2024 through 2031.

Page 468 of 570 ends

• Alternative Funding Levels
OCTA has requested two reports indicating the necessary funding to maintain the City’s current weighted average PCI as well as the necessary funding to improve the weighted average PCI by one PCI point over the next seven years. • Backlog by Fiscal Year (re: unfunded restoration, rehabilitation and reconstruction) • Percentage of total network in each of the five condition categories based on centerline mileage
• Local Match Reduction Reporting
• In order to be eligible for Local Match Reduction of 10%, the following must be submitted:
o Measurable improvement of paved road conditions during the previous reporting period defined as an overall weighted (by area) average system improvement of one PCI point.
o No reduction in the overall weighted (by area) average PCI in the MPAH or local street categories
- or –
o Have road pavement conditions, for the overall network, during the previous reporting period within the highest twenty (20%) of the scale for road pavement conditions in conformance with OCTA Ordinance No. 3, defined as a PCI of 75 or higher, otherwise defined as in “good condition”. • GIS Digital Data
All comments received from the City have been incorporated in the reports that follow. All of the City’s issues and needs that were brought to our attention are included in the report. It has been a pleasure working with you and the City on updating your Pavement Management Plan. We look forward to the continued success of this project and future teamwork with City staff.

Sincerely,
Bucknam Infrastructure Group, Inc.

Peter J. Bucknam
Project Manager
Infrastructure Management – GIS Services

Page 469 of 570 ends

City of Laguna Hills, CA Page i
2024 Citywide Pavement Management Plan – OCTA Submittal Final Report – June 30, 2024

AGENCY SUBMITTAL TABLE OF CONTENTS
I. Pavement Management Plan Certification.............................................................................. 2 II. Executive Summary ................................................................................................................. 3 III. Background ...................................................................................................................... 4 IV. Current Pavement Conditions (PCI)......................................................................................... 7 V. Projected Pavement Conditions (PCI)...................................................................................... 8 VI. Alternative Funding Levels....................................................................................................... 9 a. Maintain Existing Average Network PCI ................................................................ 9 b. Improve Average Network PCI............................................................................... 9 VII. Current and Projected Backlog by Year of Pavement Maintenance Needs............................ 9 VIII. Centerline Mileage................................................................................................................. 10 IX. Percentage of Network in Each of Five Condition Categories Based on Centerline mileage 10 X. Reduction in M2 Local Match................................................................................................ 11 XI. Appendix A – Seven-Year Road Maintenance and Rehabilitation Plan Based on Current or Expected Funding Level .............................................................................. 12 XII. Appendix B – Complete Street Listing Current Conditions.................................................... 13 XIII. Appendix C – GIS Digital Data ................................................................................................ 14 XIV. Appendix D – Quality Assurance / Quality Control Plan........................................................ 16 • Introduction ......................................................................................................... 16 • Objectives ............................................................................................................ 16 • Structure of QA/QC Plan...................................................................................... 16 • Condition Survey Procedures............................................................................... 17 • Accuracy Required for Data Collection................................................................ 18 • Random and Systematic Re-Inspections.............................................................. 18 • PCI Comparison with Past Surveys....................................................................... 19 • Inspector Qualifications and Experience ............................................................. 19 • Safety Procedures................................................................................................ 19 XV. Appendix E – Pavement Management Data Files............................................................. 20 XVI. Appendix F – GIS Maps – Current Conditions................................................................... 21

Page 470 of 570 ends

City of Laguna Hills, CA Page 1
2024 Citywide Pavement Management Plan – OCTA Submittal Final Report – June 30, 2024

CITY OF LAGUNA HILLS PAVEMENT MANAGEMENT PLAN
- part of -

COUNTYWIDE PAVEMENT MANAGEMENT PLAN GUIDELINES
(OCTA Guideline – March 2024)
Prepared by: Bucknam Infrastructure Group, Inc.

Submitted to OCTA: June 30, 2024

Page 471 of 570 ends

City of Laguna Hills, CA Page 2
2024 Citywide Pavement Management Plan – OCTA Submittal Final Report – June 30, 2024
I. Pavement Management Plan Certification
The City of Laguna Hills, CA certifies that is has a Pavement Management Plan in conformance with the criteria stated in the Orange County Transportation Authority Ordinance No. 3. This ordinance requires that a Pavement Management Plan be in place and maintained to qualify for allocation of revenues generated from renewed Measure M (M2).

The plan was developed by Bucknam Infrastructure Group, Inc. using MicroPAVER, a pavement management system conforming to American Society for Testing and Materials (ASTM) Standard D6433, and contains, at a minimum, the following elements:
• Inventory of MPAH and Local routes reviewed and updated biennially. The last update of the inventory was completed on March, 2024 for the Arterial (MPAH) and March, 2024 for the Local streets;
• Assessment of the pavement condition for all routes in the system, updated biennially. The last field review of the pavement condition was completed in March, 2024; • Percentage of all sections of pavement needing:
o Preventive Maintenance = 30.9%;
o Rehabilitation = 25.0%;
o Reconstruction = 0.0%
• Budget needs for preventive maintenance, rehabilitation and/or reconstruction of deficient sections of pavement for:
o Current biennial period $6,925,400;
o Following biennial period $6,672,000
• Funds budgeted or available for Preventive Maintenance, Rehabilitation and/or Reconstruction. o Current biennial period $2,900,000;
o Following biennial period $2,900,000
• Backlog by year of unfunded rehabilitation, restoration and reconstruction needs (See page 9); • The Pavement Management Plan is consistent with countywide pavement condition assessment standards as described in the OCTA Countywide Pavement Management Plan Guidelines adopted by the OCTA Board of Directors.
*An electronic copy of the Pavement Management Plan (with MicroPAVER or StreetSaver compatible files) has been or will be submitted with the certification statement. A copy of this certification is being provided to the Orange County Transportation Authority.

Submitted by:
__Mr. Joe Ames ______City of Laguna Hills
Name (Print) Jurisdiction
_____________________________ __________
Signed Date
Public Work Director / City Engineer
Title

Page 472 of 570 ends

City of Laguna Hills, CA Page 3
2024 Citywide Pavement Management Plan – OCTA Submittal Final Report – June 30, 2024
II. EXECUTIVE SUMMARY
2024 UPDATE OF PAVEMENT MANAGEMENT PLAN (PMP)
As the City of Laguna Hills’s infrastructure continues to mature Public Works priorities such as Local street overlay rehabilitation and proactive Arterial CIP maintenance are key projects to City staff. With the City mostly built-out, wear and tear on the infrastructure will occur at an ever-increasing rate. Pavement aging through annual weathering, dynamic and static vehicle loading, and increased usage, compounded with the increased cost of performing maintenance and rehabilitation, add to the yearly operational budget of the pavement network. System sustainability can only be achieved through proactive scheduling and the implementation of cost-efficient pavement applications.

In the upcoming years as the City continues to build upon this study through future inspections and maintenance work history, Laguna Hills pavement data will continue to provide reliable data. This will enhance the PMP through detailed Orange County Transportation Authority (OCTA) OC Go funding analysis, City specific budgetary reporting and level of service reporting.

The Laguna Hills PMP has been developed to assist City personnel by providing current data on the City’s street network and to develop cost-effective maintenance strategies to maintain a desirable level of pavement performance on a network scale, while optimizing the expenditure of limited fiscal resources.

The project consisted of analyzing the City’s 2022 dataset for quality and usability. In doing this, we were tasked to generate an updated Capital Improvement Program report that identified recommendations and deficiencies in the current operating and maintenance efforts put forth by the City.

We surveyed all designated arterial, collector (MPAH) routes and a portion of the residential network this past spring to assist the City in being compliant with OCTA – OC Go March 2024 guidelines. Additionally, we updated the City’s unique Pavement Management – GIS layer that will continue to assist the City in analyzing pavement conditions and other attribute information through the use of ESRI ArcMap and MyRoads®.

Bucknam Infrastructure Group reviewed the City’s previous maintenance efforts and the current 2024- 2026 proposed street improvement locations for pertinent segment / schedule information. This was performed in order to generate an accurate CIP report that identified network PCI improvements and deferred backlog modifications.

Page 473 of 570 ends

City of Laguna Hills, CA Page 4
2024 Citywide Pavement Management Plan – OCTA Submittal Final Report – June 30, 2024
III. BACKGROUND
In late 1990, voters throughout Orange County approved a ½-cent sales tax for transportation improvements known as OC Go, formerly known as Measure M2. Funding for streets and roads are included within the sales tax and are distributed to locals agencies through both formula and a competitive method. In late 2006, the renewal of OC Go was approved by voters that would continue the ½-cent sales tax for thirty additional years, starting in 2011.

The primary of goal of this report is to comply with established guidelines from OCTA to ensure that field data collection and reporting efforts performed by outside consultants or local agency staff are consistent.

This is required in order that funding allocations can be reviewed and based on agency comparable pavement conditions. Specifically, our findings and recommendations provide Public Works administrators, managers and field personnel with:
* PMP report consistent with OCTA OC Go guidelines
* the present condition status of the pavement network (arterial, collector, residential and industrial streets), as a whole and of any grouping or individual component within the City; * a ranked list of all streets, or segments of streets, by condition within the network; * rehabilitation/maintenance needs of each street segment by year; * an optimized priority maintenance and rehabilitation program based on cost/benefit analysis and various levels of funding;
* optimum annual pavement expenditure levels for pavement maintenance for the next seven (7) years;
* prediction of the life-cycle performance of the City’s pavement network and each individual street section; and
* pavement condition data and analysis presented in GIS through ESRI ArcMap Pavement is a dynamic structure where deterioration is constantly occurring; thus the pavement management system needs to be updated on a regular basis to reflect these changes in pavement conditions, pavement maintenance histories, and maintenance strategies based upon budgetary constraints. In our approach to develop the City’s forecasted maintenance recommendations we worked with Laguna Hills Public Works/Engineering staff in identifying unit costs for all maintenance practices used on an annual basis. Currently, based upon the City’s maintenance practices and their associated unit costs, the total replacement value of the Laguna Hills pavement network is $222,559,400. This value clearly indicates that the City’s pavement network is the most valuable and essential asset to Laguna Hills.

The City’s use of slurry seal, AC Overlay and R&R practices are typically applied at a six year, ten year and 25 year frequency respectively. These frequencies are typical but the City may see increases in deterioration rates due to environmental, load and high average daily traffic (ADT) volumes. For example, high ADT volumes along one of Laguna Hills’s arterial streets will increase deterioration rates for a previously applied AC Overlay compared to a small local street. These deterioration rates are monitored through frequent biennial inspections and functional class deterioration analysis within the City’s PMP database.

Page 474 of 570 ends

City of Laguna Hills, CA Page 5
2024 Citywide Pavement Management Plan – OCTA Submittal Final Report – June 30, 2024

FINDINGS AND RECOMMENDATIONS
Through our assessment of historical maintenance performed within the City and through our discussions with City staff the conditional data found across the network clearly shows that the City has applied strong, preventative maintenance strategies over the past decade. Pavement management involves frequent preventative maintenance; as pavement deteriorates through heavy traffic impacts, weathering and time, preventative maintenances (such as slurry seal, stop gap, etc.) have limited benefits. A more proactive rehabilitation applications have to be used.

Our study has shown that key slurry seal and selective overlay projects will be needed over the next five years to maintain the network’s high level of condition. Currently, the City’s Local network holds an above average weighted PCI values while the Arterial / Collector network has fallen to the “Fair” condition category. It is our recommendation that a proactive, common sense Arterial / Collector overlay program and a continued slurry seal program be scheduled over the next several fiscal years. This will ensure that the citywide weighted PCI will sustain itself and allow for routine slurry seal maintenance to continue.

We have found and recommend the following detailed items which should be reviewed and considered for a proactive approach to the future management of the PMP:

ARTERIAL / COLLECTOR (MPAH) FINDINGS AND RECOMMENDATIONS The actual workload requirements identified indicate that the Arterial (MPAH) street network is currently in “fair” condition. To improve upon these conditions, it is essential that preventive maintenance and overlay rehabilitations are funded at the levels identified on page 9 to increase the overall condition level to “good” (PCI level > 75). Our Arterial/Collector conditional findings and annual revenue funding recommendations are shown below:
• The MPAH network has a weighted PCI of 74.1
• The MPAH network consists of 42.6 centerline miles and 9,067,736 SF of pavement; • Currently, 43% of the MPAH network (18.2 centerline miles) qualify for slurry seal/stop gap maintenance; 28% of the network (11.8 centerline miles) qualify for rehabilitation maintenance; o With MPAH conditions showing 11.8 miles of streets in need of major rehabilitation a continuous and proactive Arterial CIP program needs to be sustained; • At a minimum, MPAH maintenance projects should focus on the improving the current PCI to a weighted average of 75 within the next 7 years;
o Increase the MPAH revenues to an average annual level of $4,650,000 every two years for the term of the CIP to generate the PCI identified on page 9; • Develop a proactive fiscal and planned approach to identify MPAH overlay projects based on the deferred backlog modeling within MicroPAVER;
o Demonstrated Improve PCI budget (page 9) is ample to increase the MPAH weighted PCI

Page 475 of 570 ends

City of Laguna Hills, CA Page 6
2024 Citywide Pavement Management Plan – OCTA Submittal Final Report – June 30, 2024
of 74.1 to 75.3 after seven years, additionally, the citywide deferred backlog increases from a level of $4.9 million to $7.2 million after seven years; and • Perform pavement inspections on the MPAH network every two years to build a solid planning model within MicroPAVER to track PCI deterioration; also follows new OCTA guidelines for OC Go.

LOCAL FINDINGS AND RECOMMENDATIONS
The actual workload requirements identified indicate that the Local street network is currently in “very good” condition. To maintain this condition, it is critical that preventive maintenance and overlay activities are funded at the levels identified on page 9 to maintain a “very good” network weighted average PCI value. Our Local network findings for conditional data and recommendations for revenue expenditures are shown below:
• The Local network has a weighted PCI of 89.2;
• The Local network consists of 63.7 centerline miles and 12,189,130 SF of pavement; • Currently, 30% of the Local network (19.2 centerline miles) qualifies for slurry seal/stop gap maintenance; 3% of the Local network (1.9 centerline miles) qualify for rehabilitation maintenance;
• At a minimum, Local maintenance projects should focus on the maintaining the current PCI above a weighted average of 89 over the next 7 years;
o Maintain the Local revenues at an average annual level of $1,993,000 every two years for the term of the CIP to generate the PCI identified on page 9; • Develop a proactive fiscal and planned approach to identify local overlay projects based on the deferred backlog modeling within MicroPAVER;
o Demonstrated Maintain PCI budget (page 9) is ample to sustain the Local weighted PCI at average above 89 after seven years, additionally, the citywide deferred backlog increases from a level of $4.9 million to $8.9 million after seven years; and • Perform pavement inspections on the Local network every four years to build a solid planning model within MicroPAVER to track PCI deterioration; also follows new OCTA guidelines for OC Go.

Page 476 of 570 ends

City of Laguna Hills, CA Page 7
2024 Citywide Pavement Management Plan – OCTA Submittal Final Report – June 30, 2024
IV. CURRENT PAVEMENT CONDITIONS (PCI)

Page 477 of 570 ends

City of Laguna Hills, CA Page 8
2024 Citywide Pavement Management Plan – OCTA Submittal Final Report – June 30, 2024
V. PROJECTED PAVEMENT CONDITIONS (PCI)
Based on the current funding that the City has identified, we have applied the City’s biennial funding against the conditions found on the network from the most recent survey. We have included summary tables below to demonstrate our PCI findings.

Page 478 of 570 ends

City of Laguna Hills, CA Page 9
2024 Citywide Pavement Management Plan – OCTA Submittal Final Report – June 30, 2024
VI. ALTERNATIVE FUNDING LEVELS
Maintain Existing Average Network PCI

Improve Average Network PCI
VII. CURRENT AND PROJECTED BACKLOG BY YEAR OF PAVEMENT

MAINTENANCE NEEDS

Page 479 of 570 ends

City of Laguna Hills, CA Page 10
2024 Citywide Pavement Management Plan – OCTA Submittal Final Report – June 30, 2024

DEFERRED MAINTENANCE
Delaying repairs on streets where pavement conditions indicate a need generates deferred maintenance or “backlog”. Deferred maintenance is work that is postponed to a future budget cycle, or until funds are available. As maintenance is deferred, the opportunity to apply preventive, life extending pavement treatments is forfeited and the ultimate cost of rehabilitation multiplies (i.e. slurry seal costs to overlay costs). By using the City’s pavement maintenance applications and their associated unit costs, when a budgetary model is exercised within the PMP software the amount of deferred maintenance is calculated. Based upon the available budget applied to the model, deferred maintenance will increase or decrease.

As maintenance is deferred, the opportunity to apply life extending preventive pavement applications is lost and the ultimate cost of rehabilitation multiples.

In the case of Laguna Hills, the City’s actual budget will allow the amount of deferred maintenance on both the Arterial and Local networks to increase by 340% by FY 2030. The City should consider this impact as well as the resulting lower PCI and increase CIP/maintenance funding to a level of $6,643,400 biennially.

VIII. CENTERLINE MILEAGE
IX. PERCENTAGE OF NETWORK IN EACH OF FIVE CONDITION CATEGORIES

BASED ON CENTERLINE MILES

Page 480 of 570 ends

City of Laguna Hills, CA Page 11
2024 Citywide Pavement Management Plan – OCTA Submittal Final Report – June 30, 2024
X. REDUCTION IN M2 LOCAL MATCH
A local agency match reduction of 10% of the eligible cost for projects submitted for consideration of funding through the M2 Comprehensive Transportation Funding Programs (CTFP) call for projects is available if the local agency either:
a. Shows measurable improvement of paved road conditions during the previous reporting period defined as an overall weighted (by area) average system improvement of one Pavement Condition Index (PCI) point with no reduction in the overall weighted (by area) average PCI in the Master Plan of Arterial Highways (MPAH) or local categories:
or
b. Have road pavement conditions during the previous reporting period, within the highest 20% of the scale for road pavement conditions in conformance with OCTA Ordinance No. 3, defined as a PCI of 75 or higher, otherwise defined as in “good condition”.

Road conditions found through our 2024 PMP management study shows that the City is eligible for Local Match Reduction based on the current network weighted PCI of 82.7 (currently having a weighted PCI over 75).

Page 481 of 570 ends

City of Laguna Hills, CA Page 12
2024 Citywide Pavement Management Plan – OCTA Submittal Final Report – June 30, 2024
XI. APPENDIX A – SEVEN YEAR ROAD MAINTENANCE AND REHABILITATION

PLAN BASED ON CURRENT OR EXPECTED FUNDING LEVEL

Page 482 of 570 ends

City of Laguna Hills, CA
Forecast Maintenance / Rehabilitation (FMR) Report - FY 2024-2031 Sorted by Rank, FY, Name Order (A-Z)
FY Branch ID Sec ID Name From To Type Rank Zone L W Area PCI PCI Pct Climate PCI Pct Load PCI Pct Other Maint. Type Total $ Last Work Type Last Work Date Arterials / Collectors (MPAH)
2023-25 28 4 PASEO DE VALENCIA AVE DE LA CARLOTA EL TORO RD AAC B F 1,303 38 48,641 79 47 53 0 1.5" Grind- ARHM Overlay $189,700 Overlay - AC Structural 7/1/05 2023-25 28 28 PASEO DE VALENCIA EL TORO RD AVE DE LA CARLOTA AAC B F 1,267 41 41,587 83 96 0 4 1.5" Grind- ARHM Overlay $178,824 Overlay - AC Structural 7/1/05 2023-25 28 2 PASEO DE VALENCIA EL TORO RD CALLE DE LA PLATA AAC B E 1,040 40 45,446 56 46 30 24 1.5" Grind- ARHM Overlay $195,418 Overlay - AC Structural 7/1/08 2023-25 28 30 PASEO DE VALENCIA CALLE DE LA PLATA EL TORO RD AAC B E 1,008 40 47,444 63 45 55 0 1.5" Grind- ARHM Overlay $204,009 Overlay - AC Structural 7/1/08 2023-25 28 3 PASEO DE VALENCIA CALLE DE LA PLATA CALLE DE LA MAGDALENA AAC B E 742 36 30,117 55 59 38 3 1.5" Grind- ARHM Overlay $129,503 Overlay - AC Structural 7/1/08 2023-25 28 31 PASEO DE VALENCIA CALLE DE LA MAGDALENA CALLE DE LA PLATA AAC B E 697 40 29,659 48 47 46 7 1.5" Grind- ARHM Overlay $127,534 Overlay - AC Structural 7/1/08 2023-25 28 1 PASEO DE VALENCIA CALLE DE LA MAGDALENA HEALTH CENTER DR AAC B E 1,139 34 45,817 56 35 61 4 1.5" Grind- ARHM Overlay $197,013 Overlay - AC Structural 7/1/08 2023-25 28 27 PASEO DE VALENCIA HEALTH CENTER DR CALLE DE LA MAGDALENA AAC B E 1,088 40 43,154 44 28 69 3 1.5" Grind- ARHM Overlay $185,562 Overlay - AC Structural 7/1/08 2023-25 28 9 PASEO DE VALENCIA HEALTH CENTER DR LOS ALISOS BLVD AAC B E 1,667 45 71,789 66 50 35 15 1.5" Grind- ARHM Overlay $308,693 Overlay - AC Structural 7/1/08 2023-25 28 29 PASEO DE VALENCIA LOS ALISOS BLVD HEALTH CENTER DR AAC B E 1,733 45 69,166 52 59 33 8 1.5" Grind- ARHM Overlay $297,414 Overlay - AC Structural 7/1/08 2023-25 28 34 PASEO DE VALENCIA LOS ALISOS BLVD KENNINGTON DR AAC B E 1,287 34 53,698 59 73 19 8 1.5" Grind- ARHM Overlay $230,901 Overlay - AC Structural 7/1/08 2023-25 28 10 PASEO DE VALENCIA KENNINGTON DR LOS ALISOS BLVD AAC B E 1,233 35 50,394 56 65 31 4 1.5" Grind- ARHM Overlay $216,694 Overlay - AC Structural 7/1/08 2023-25 28 8 PASEO DE VALENCIA KENNINGTON DR BECKENHAM ST AAC B E 571 35 23,302 65 37 48 15 1.5" Grind- ARHM Overlay $100,199 Overlay - AC Structural 7/1/08 2023-25 28 33 PASEO DE VALENCIA BECKENHAM ST KENNINGTON DR AAC B E 570 34 23,336 54 60 35 5 1.5" Grind- ARHM Overlay $100,345 Overlay - AC Structural 7/1/08 2023-25 28 7 PASEO DE VALENCIA BECKENHAM ST LAGUNA HILLS DR AAC B E 1,554 34 60,304 62 50 45 5 1.5" Grind- ARHM Overlay $259,307 Overlay - AC Structural 7/1/08 2023-25 28 32 PASEO DE VALENCIA LAGUNA HILLS DR BECKENHAM ST AAC B E 1,559 34 63,532 49 66 33 1 1.5" Grind- ARHM Overlay $273,188 Overlay - AC Structural 7/1/08 2023-25 28 5 PASEO DE VALENCIA LAGUNA HILLS DR ALICIA PKWY AAC B E 1,605 52 73,824 71 93 6 1 1.5" Grind- ARHM Overlay $317,443 Overlay - AC Structural 7/1/08 2023-25 28 24 PASEO DE VALENCIA ALICIA PKWY LAGUNA HILLS DR AAC B E 1,515 52 72,633 71 56 17 27 1.5" Grind- ARHM Overlay $312,322 Overlay - AC Structural 7/1/08 $3,824,069
2023-25 18 1 LA PAZ RD MOULTON PKWY ALAMEDA AVE AAC B C 2,228 40 86,293 69 68 25 7 1.5" Grind- ARHM Overlay $371,060 Overlay - AC Structural 7/1/08 2023-25 18 2 LA PAZ RD W. CITY LIMITS MOULTON PKWY AAC B C 809 50 61,186 68 50 44 6 1.5" Grind- ARHM Overlay $263,100 Overlay - AC Structural 7/1/08 2023-25 18 12 LA PAZ RD ALAMEDA AVE MOULTON PKWY AAC B C 2,180 40 95,681 69 94 5 1 1.5" Grind- ARHM Overlay $411,428 Overlay - AC Structural 7/1/08 2023-25 18 13 LA PAZ RD MOULTON PKWY W. CITY LIMITS AAC B C 840 50 57,142 63 50 48 2 1.5" Grind- ARHM Overlay $245,711 Overlay - AC Structural 7/1/08 $920,239
2025-27 6 2 AVENIDA DE LA CARLOTA RIDGE ROUTE DR PASEO DE VALENCIA AAC B F 3,051 38 88,207 57 68 23 9 1.5" Grind- ARHM Overlay $418,101 Surface Course - AC 7/1/04 2025-27 6 3 AVENIDA DE LA CARLOTA LAKE FOREST DR PLAZA POINTE DR AAC B F 689 30 17,519 55 48 37 15 1.5" Grind- ARHM Overlay $83,040 Surface Course - AC 7/1/04 2025-27 6 4 AVENIDA DE LA CARLOTA COMMERCE CENTER RIDGE ROUTE DR AAC B F 794 30 21,860 67 67 5 28 Type II Slurry Seal $18,362 Surface Course - AC 7/1/04 2025-27 6 5 AVENIDA DE LA CARLOTA PLAZA POINTE DR COMMERCE CENTER AAC B F 2,408 30 66,411 64 78 16 6 Type II Slurry Seal $55,785 Surface Course - AC 7/1/04 2025-27 6 6 AVENIDA DE LA CARLOTA PVMT CHNGE 650' E/ OAKBROOK VILLAGE LOS ALISOS BLVD AAC B F 505 40 41,675 77 58 25 17 Type II Slurry Seal $35,007 Surface Course - AC 7/1/01 2025-27 6 7 AVENIDA DE LA CARLOTA PASEO DE VALENCIA EL TORO RD AAC B F 656 40 38,693 68 63 37 0 1.5" Grind- ARHM Overlay $183,405 Overlay - AC Structural 5/29/12 2025-27 6 8 AVENIDA DE LA CARLOTA EL TORO RD PASEO DE VALENCIA AAC B F 642 40 21,371 73 41 47 12 Type II Slurry Seal $17,952 Overlay - AC Structural 5/29/12 2025-27 6 9 AVENIDA DE LA CARLOTA LOS ALISOS BLVD PVMT CHNGE 650' E/ OAKBROOK VILLAGE AAC B E 505 40 44,128 73 100 0 0 Type II Slurry Seal $37,068 Surface Course - AC 7/1/01 $848,720
2027-29 6 11 AVENIDA DE LA CARLOTA RIDGE ROUTE DR COMMERCE CENTER AAC B F 792 29 23,202 62 65 26 9 1.5" Grind- ARHM Overlay $121,346 Surface Course - AC 7/1/04 2027-29 6 12 AVENIDA DE LA CARLOTA PASEO DE VALENCIA RIDGE ROUTE DR AAC B F 3,049 38 87,210 52 53 40 7 1.5" Grind- ARHM Overlay $456,108 Surface Course - AC 7/1/04 2027-29 6 13 AVENIDA DE LA CARLOTA COMMERCE CENTER PLAZA POINTE DR AAC B F 2,453 29 73,670 65 80 15 5 1.5" Grind- ARHM Overlay $385,294 Surface Course - AC 7/1/04 2027-29 6 14 AVENIDA DE LA CARLOTA PLAZA POINTE DR LAKE FOREST DR AAC B F 585 60 19,070 61 66 29 5 1.5" Grind- ARHM Overlay $99,736 Surface Course - AC 7/1/04 $1,062,485
2029-31 18 11 LA PAZ RD ALISO HILLS DR GALLUP CIR AAC B C 930 40 36,465 65 83 13 4 1.5" Grind- ARHM Overlay $210,038 Overlay - AC Structural 7/1/08 2029-31 18 14 LA PAZ RD PASEO DE VALENCIA ALISO HILLS DR AAC B C 2,068 40 80,657 61 62 29 9 1.5" Grind- ARHM Overlay $464,584 Overlay - AC Structural 7/1/08 2029-31 18 15 LA PAZ RD MC INTYRE ST CHAMPLAIN RD AAC B D 1,015 30 33,323 59 38 58 4 1.5" Grind- ARHM Overlay $191,940 Overlay - AC Structural 7/1/08 2029-31 18 17 LA PAZ RD CABOT RD MC INTYRE ST AAC B D 836 30 30,149 56 21 74 5 1.5" Grind- ARHM Overlay $173,658 Overlay - AC Structural 7/1/08 $1,040,221
Locals
2024-25 No Maintenance / CIP funding projections are scheduled for FY 2024/25 at this time; this is demonstrated within Actual and Alternative funding tables. City aggregates funding "biennially" and will show FY 2024/25 expenditures within the FY 2024 OCTA compliance reporting. 2025-27 41 1 ABILENE CIR HIDDEN TRAIL RD WEST END AAC E A 410 38 16,081 92 100 0 0 Prev. Maint. - Stop Gap $804 Overlay - AC Structural 8/1/14 2025-27 49 1 ANADALE DR VISTA VIEJO N CNR NORTH END AAC E A 890 35 31,942 94 85 0 15 Prev. Maint. - Stop Gap $1,597 Overlay - AC Structural 8/1/14 2025-27 58 1 BARKSTONE LN VISTA VIEJO NORTH END AAC E A 660 36 23,809 93 96 0 4 Prev. Maint. - Stop Gap $1,190 Overlay - AC Structural 8/1/14 2025-27 60 1 BEARGRASS CIR LOST COLT DR SOUTH END AAC E A 165 33 7,683 84 70 30 0 Type II Slurry Seal $3,842 Surface Treatment - Slurry Seal 6/1/18 2025-27 64 1 BLACK HORSE LN LOST COLT DR EAST END AAC E A 850 36 30,715 89 52 48 0 Prev. Maint. - Stop Gap $1,536 Overlay - AC Structural 8/1/12 2025-27 66 1 BOOTHILL CT DILLION RD WEST END AAC E A 475 38 17,758 74 72 28 0 Type II Slurry Seal $8,879 Overlay - AC Structural 8/1/14 2025-27 68 1 BRADFORD LN NOTTINGHAM CT NORTH END AAC E A 225 41 7,108 91 49 45 6 Prev. Maint. - Stop Gap $355 Overlay - AC Structural 8/1/12 2025-27 69 2 BRIDLEWOOD DR OSO PKWY LAUREL CREST DR AAC E A 1,250 38 44,957 90 46 54 0 Prev. Maint. - Stop Gap $2,248 Overlay - AC Structural 8/1/12 2025-27 69 4 BRIDLEWOOD DR LAUREL CREST DR MEADOW CREST DR AAC E A 791 38 28,270 89 45 48 7 Prev. Maint. - Stop Gap $1,414 Overlay - AC Structural 8/1/12 2025-27 69 6 BRIDLEWOOD DR MEADOW CREST DR VISTA VIEJO AAC E A 1,476 38 53,923 93 65 35 0 Prev. Maint. - Stop Gap $2,696 Overlay - AC Structural 8/1/12 2025-27 81 1 CARLSON CT LAUREL CREST DR EAST END AAC E A 135 33 7,131 92 66 0 34 Prev. Maint. - Stop Gap $357 Overlay - AC Structural 8/1/14 2025-27 85 1 CEDARBLUFF TER WOODBLUFF RD EAST END AAC E A 845 35 30,342 88 40 60 0 Prev. Maint. - Stop Gap $1,517 Overlay - AC Structural 8/1/14 2025-27 89 1 CHELSEA LN NOTTINGHAM CT SOUTH END AAC E A 310 33 10,946 83 27 0 73 Type II Slurry Seal $5,473 Overlay - AC Structural 8/1/14 2025-27 92 1 COACH SPRINGS LN HIDDEN TRAIL RD WEST END AAC E A 500 38 18,511 88 100 0 0 Prev. Maint. - Stop Gap $926 Patching - AC Deep 8/1/14 2025-27 106 1 DEPUTY CIR DILLION RD SOUTH END AAC E A 1,245 34 44,708 75 77 23 0 Type II Slurry Seal $22,354 Overlay - AC Structural 8/1/14 2025-27 108 1 DERBYHILL DR HIDDEN TRAIL RD WEST END AAC E A 1,140 38 45,235 94 100 0 0 Prev. Maint. - Stop Gap $2,262 Overlay - AC Structural 8/1/14 2025-27 110 1 DEVONSHIRE RD FALLING LEAF DR NOTTINGHAM CT AAC E A 900 37 33,429 92 88 0 12 Prev. Maint. - Stop Gap $1,671 Overlay - AC Structural 8/1/12 2025-27 111 1 DILLION RD LOST TRAIL DR EAST END AAC E A 1,840 38 70,587 80 39 61 0 Type II Slurry Seal $35,294 Surface Treatment - Slurry Seal 6/1/18 2025-27 348 1 ELDERBROOK LN WOODBLUFF RD SOUTH END AAC E A 160 33 7,705 93 100 0 0 Prev. Maint. - Stop Gap $385 Overlay - AC Structural 8/1/14 2025-27 120 1 ELM BANK DR DEVONSHIRE RD WEST END AAC E A 510 37 18,896 94 95 0 5 Prev. Maint. - Stop Gap $945 Overlay - AC Structural 8/1/14 2025-27 121 1 EMPTY SADDLE DR NELLIE GAIL RD SPOTTED PONY LN AAC E A 1,880 36 55,789 88 81 19 0 Prev. Maint. - Stop Gap $2,789 Surface Treatment - Slurry Seal 6/1/18 2025-27 125 1 EUCALYPTUS DR WOODBLUFF RD EAST END AAC E A 340 32 11,189 91 56 41 3 Prev. Maint. - Stop Gap $559 Overlay - AC Structural 8/1/14 2025-27 129 1 FAIRCOURT LN WOODBLUFF RD EAST END AAC E A 565 36 21,572 95 100 0 0 Prev. Maint. - Stop Gap $1,079 Overlay - AC Structural 8/1/14

Page 1 of 8 ends
Page 483 of 570 ends

City of Laguna Hills, CA
Forecast Maintenance / Rehabilitation (FMR) Report - FY 2024-2031 Sorted by Rank, FY, Name Order (A-Z)
FY Branch ID Sec ID Name From To Type Rank Zone L W Area PCI PCI Pct Climate PCI Pct Load PCI Pct Other Maint. Type Total $ Last Work Type Last Work Date 2025-27 130 1 FALLING LEAF DR DEVONSHIRE RD WOODBLUFF RD AAC E A 1,670 37 60,018 93 84 0 16 Prev. Maint. - Stop Gap $3,001 Overlay - AC Structural 8/1/14 2025-27 131 1 FARGO RD ROCKRIDGE RD SOUTH END AAC E A 535 37 20,058 83 76 24 0 Type II Slurry Seal $10,029 Overlay - AC Structural 8/1/14 2025-27 133 1 FLETCHER PL LAUREL CREST DR EAST END AAC E A 270 40 11,011 93 96 0 4 Prev. Maint. - Stop Gap $551 Overlay - AC Structural 8/1/14 2025-27 140 1 GOLD DUST LN HIDDEN TRAIL RD SOUTH END AAC E A 910 36 32,723 84 75 25 0 Type II Slurry Seal $16,362 Overlay - AC Structural 8/1/14 2025-27 141 1 GOLDEN ROD CIR MAGNOLIA CT EAST END AAC E A 85 63 5,132 94 100 0 0 Prev. Maint. - Stop Gap $257 Overlay - AC Structural 8/1/14 2025-27 346 1 GREEN HILLS LN WOODBLUFF RD RAIN TREE RD AAC E A 597 33 18,373 94 100 0 0 Prev. Maint. - Stop Gap $919 Overlay - AC Structural 8/1/14 2025-27 14 1 GREENFIELD DR SR 73 RAMPS HIDDEN TRAIL RD AAC E A 794 38 32,549 92 89 0 11 Prev. Maint. - Stop Gap $1,627 Overlay - AC Structural 8/1/12 2025-27 146 1 HARRINGTON CT NOTTINGHAM CT NORTH END AAC E A 395 38 15,142 94 86 0 14 Prev. Maint. - Stop Gap $757 Overlay - AC Structural 8/1/14 2025-27 342 1 HIDDEN TRAIL RD GREENFIELD DR PINESTRAP CIR AAC E A 1,612 38 61,892 92 65 32 3 Prev. Maint. - Stop Gap $3,095 Overlay - AC Structural 8/1/12 2025-27 342 2 HIDDEN TRAIL RD PINESTRAP CIR DERBYHILL DR AAC E A 1,580 38 59,562 88 40 60 0 Prev. Maint. - Stop Gap $2,978 Overlay - AC Structural 8/1/12 2025-27 342 3 HIDDEN TRAIL RD DERBYHILL DR STAGELINE DR AAC E A 1,392 38 52,671 85 40 60 0 Type II Slurry Seal $26,336 Overlay - AC Structural 8/1/12 2025-27 342 4 HIDDEN TRAIL RD STAGELINE DR NELLIE GAIL RD AAC E A 1,944 38 72,936 82 88 10 2 Type II Slurry Seal $36,468 Overlay - AC Structural 8/1/14 2025-27 150 1 HIGHWOOD CIR ROCKING HORSE LN NORTH END AAC E A 805 40 27,201 81 63 0 37 Type II Slurry Seal $13,601 Surface Treatment - Slurry Seal 6/1/18 2025-27 155 1 IRONWOOD DR GREEN HILLS LN MIDDLERIDGE LN AAC E A 900 33 31,745 95 100 0 0 Prev. Maint. - Stop Gap $1,587 Overlay - AC Structural 8/1/14 2025-27 173 1 LAURAL CREST DR BRIDLEWOOD DR PATTERSON AAC E A 1,400 37 51,606 91 57 43 0 Prev. Maint. - Stop Gap $2,580 Overlay - AC Structural 8/1/12 2025-27 178 1 LONE ACRES LN LOST TRAIL DR EAST END AAC E A 520 37 20,025 80 64 34 2 Type II Slurry Seal $10,013 Overlay - AC Structural 8/1/14 2025-27 179 1 LONE PINE CIR HIDDEN TRAIL RD EAST END AAC E A 340 38 13,691 92 93 0 7 Prev. Maint. - Stop Gap $685 Overlay - AC Structural 8/1/14 2025-27 183 1 LOST COLT DR MAVERICK CIR STAGELINE DR AAC E A 905 38 30,716 81 50 46 4 Type II Slurry Seal $15,358 Overlay - AC Structural 8/1/12 2025-27 183 2 LOST COLT DR STAGELINE DR BEARGRASS CIR AAC E A 1,688 40 56,926 86 45 55 0 Prev. Maint. - Stop Gap $2,846 Overlay - AC Structural 8/1/12 2025-27 183 3 LOST COLT DR BEARGRASS CIR NELLIE GAIL RD AAC E A 600 40 18,912 90 63 23 14 Prev. Maint. - Stop Gap $946 Overlay - AC Structural 8/1/12 2025-27 184 1 LOST TRAIL DR RAPID FALLS RD DILLION RD AAC E A 1,880 38 69,669 85 54 46 0 Prev. Maint. - Stop Gap $3,483 Surface Treatment - Slurry Seal 6/1/18 2025-27 191 1 MAGNOLIA CT FALLING LEAF DR SOUTH END AAC E A 555 33 20,100 93 92 0 8 Prev. Maint. - Stop Gap $1,005 Overlay - AC Structural 8/1/14 2025-27 193 1 MAPLE VIEW DR LAUREL CREST DR WEST END AAC E A 580 36 21,015 94 91 0 9 Prev. Maint. - Stop Gap $1,051 Overlay - AC Structural 8/1/14 2025-27 196 1 MAVERICK CIR WESTRIDGE LN SOUTH END AAC E A 290 40 11,851 90 57 40 3 Prev. Maint. - Stop Gap $593 Overlay - AC Structural 8/1/12 2025-27 199 1 MEADOW CREST DR BRIDLEWOOD DR NORTH END AAC E A 625 36 23,545 89 55 45 0 Prev. Maint. - Stop Gap $1,177 Overlay - AC Structural 8/1/12 2025-27 203 1 MIDDLERIDGE LN IRONWOOD DR WOODBLUFF RD AAC E A 235 33 5,944 95 100 0 0 Prev. Maint. - Stop Gap $297 Overlay - AC Structural 8/1/14 2025-27 210 1 MOORE OAKS RD DEVONSHIRE RD NORTH END AAC E A 690 33 25,602 92 88 0 12 Prev. Maint. - Stop Gap $1,280 Overlay - AC Structural 8/1/12 2025-27 25 10 NELLIE GAIL RD OSO PKWY LANE MERGE AAC E A 983 20 19,855 83 83 14 3 Type II Slurry Seal $9,928 Surface Treatment - Slurry Seal 6/1/18 2025-27 25 11 NELLIE GAIL RD ROCKING HORSE LN EMPTY SADDLE DR AAC E A 611 38 22,929 75 35 64 1 Cape Seal $29,808 Surface Treatment - Slurry Seal 6/1/18 2025-27 25 12 NELLIE GAIL RD LOST COLT DR MOULTON PKWY AAC E A 575 19 9,886 79 61 39 0 Type II Slurry Seal $4,943 Surface Treatment - Slurry Seal 6/1/18 2025-27 25 13 NELLIE GAIL RD LOST COLT DR RED LODGE PL AAC E A 645 40 24,097 82 87 13 0 Type II Slurry Seal $12,049 Surface Treatment - Slurry Seal 6/1/18 2025-27 25 14 NELLIE GAIL RD RED LODGE PL ROCKING HORSE LN AAC E A 1,606 40 60,747 78 62 36 2 Type II Slurry Seal $30,374 Overlay - AC Structural 7/1/17 2025-27 25 15 NELLIE GAIL RD ROAD SPLIT EMPTY SADDLE DR AAC E A 321 38 11,759 80 61 39 0 Type II Slurry Seal $5,880 Surface Treatment - Slurry Seal 6/1/18 2025-27 25 16 NELLIE GAIL RD MOULTON PKWY LOST COLT DR AAC E A 603 20 10,300 81 61 39 0 Type II Slurry Seal $5,150 Overlay - AC Structural 7/1/17 2025-27 25 17 NELLIE GAIL RD LANE MERGE OSO PKWY AAC E A 968 20 21,182 78 62 28 10 Type II Slurry Seal $10,591 Patching - AC Deep 8/1/14 2025-27 217 1 NOTTINGHAM CT OSO PKWY DEVONSHIRE RD AAC E A 1,409 38 51,769 88 42 54 4 Prev. Maint. - Stop Gap $2,588 Overlay - AC Structural 8/1/12 2025-27 217 2 NOTTINGHAM CT DEVONSHIRE RD BRADFORD LN AAC E A 899 38 32,249 88 76 19 5 Prev. Maint. - Stop Gap $1,612 Overlay - AC Structural 8/1/12 2025-27 218 1 OAK HOLLOW RD ELM BANK DR NORTH END AAC E A 180 38 8,035 92 100 0 0 Prev. Maint. - Stop Gap $402 Overlay - AC Structural 8/1/14 2025-27 229 1 PATTERSON PL LAUREL CREST DR MOORE OAKS RD AAC E A 360 37 12,715 91 63 37 0 Prev. Maint. - Stop Gap $636 Overlay - AC Structural 8/1/12 2025-27 235 1 PINE STRAP CIR HIDDEN TRAIL RD WEST END AAC E A 725 33 27,434 78 73 27 0 Type II Slurry Seal $13,717 Overlay - AC Structural 8/1/14 2025-27 237 1 PINTO CT LOST TRAIL DR EAST END AAC E A 170 33 8,226 82 100 0 0 Type II Slurry Seal $4,113 Overlay - AC Structural 8/1/14 2025-27 239 1 POINTSETTIA CT WOOD BROOD RD NORTH END AAC E A 150 33 7,038 95 87 0 13 Prev. Maint. - Stop Gap $352 Overlay - AC Structural 8/1/14 2025-27 347 1 RAIN TREE RD GREEN HILLS LN EAST END AAC E A 646 33 25,006 95 93 0 7 Prev. Maint. - Stop Gap $1,250 Overlay - AC Structural 8/1/14 2025-27 32 1 RAPID FALLS RD CABOT RD SUNDOWNER DR AAC E A 997 38 36,020 86 51 43 6 Prev. Maint. - Stop Gap $1,801 Overlay - AC Structural 8/1/12 2025-27 32 2 RAPID FALLS RD SUNDOWNER DR LOST TRAIL DR AAC E A 1,055 38 38,956 81 45 49 6 Type II Slurry Seal $19,478 Overlay - AC Structural 8/1/12 2025-27 32 3 RAPID FALLS RD LOST TRAIL DR HIDDEN TRAIL RD AAC E A 1,292 38 47,436 83 43 50 7 Type II Slurry Seal $23,718 Overlay - AC Structural 8/1/12 2025-27 246 1 RED BARN CIR NELLIE GAIL RD NORTH END AAC E A 165 33 7,822 75 81 15 4 Type II Slurry Seal $3,911 Surface Treatment - Slurry Seal 6/1/18 2025-27 248 1 RED LODGE PL NELLIE GAIL RD WEST END AAC E A 685 40 23,012 88 73 27 0 Prev. Maint. - Stop Gap $1,151 Surface Treatment - Slurry Seal 6/1/18 2025-27 254 1 ROCKING HORSE LN NELLIE GAIL RD NORTH END AAC E A 970 39 32,425 81 58 40 2 Type II Slurry Seal $16,213 Surface Treatment - Slurry Seal 6/1/18 2025-27 255 1 ROCKRIDGE RD HIDDEN TRAIL RD EAST END AAC E A 995 36 35,695 86 27 64 9 Prev. Maint. - Stop Gap $1,785 Surface Treatment - Slurry Seal 6/1/18 2025-27 256 1 RODEO CIR HIDDEN TRAIL RD EAST END AAC E A 415 38 15,843 82 66 31 3 Type II Slurry Seal $7,922 Overlay - AC Structural 8/1/14 2025-27 257 1 ROLLING HILLS RD WILLOW TREE LN WEST END AAC E A 515 33 17,948 90 100 0 0 Prev. Maint. - Stop Gap $897 Overlay - AC Structural 8/1/14 2025-27 266 1 SANDRIDGE CIR WESTRIDGE LN EAST END AAC E A 135 46 6,755 83 65 28 7 Type II Slurry Seal $3,378 Overlay - AC Structural 8/1/14 2025-27 273 1 SHENANDOAH DR HIDDEN TRAIL RD SOUTH END AAC E A 550 41 22,289 87 49 44 7 Prev. Maint. - Stop Gap $1,114 Surface Treatment - Slurry Seal 6/1/18 2025-27 284 1 SPOTTED PONY LN EAST END WEST END AAC E A 955 39 30,432 84 87 13 0 Type II Slurry Seal $15,216 Surface Treatment - Slurry Seal 6/1/18 2025-27 288 1 STAGELINE DR LOST COACH DR HIDDEN TRAIL RD AAC E A 1,820 38 68,144 90 97 0 3 Prev. Maint. - Stop Gap $3,407 Overlay - AC Structural 8/1/14 2025-27 289 1 STAGEWOOD CT STAGELINE DR NORTH END AAC E A 355 38 14,585 91 100 0 0 Prev. Maint. - Stop Gap $729 Overlay - AC Structural 8/1/14 2025-27 292 1 STRATFORD PL NOTTINGHAM PL NORTH END AAC E A 265 40 10,707 95 93 0 7 Prev. Maint. - Stop Gap $535 Overlay - AC Structural 8/1/14 2025-27 295 1 SUNDOWNER DR RAPID FALLS RD NORTH END AAC E A 310 38 11,253 87 41 25 34 Prev. Maint. - Stop Gap $563 Overlay - AC Structural 8/1/12 2025-27 321 1 VISTA VIEJO CITY LIMIT DEVONSHIRE RD AAC E A 1,530 39 53,056 86 23 77 0 Prev. Maint. - Stop Gap $2,653 Overlay - AC Structural 8/1/12 2025-27 322 1 WAGON WHEEL DR HIDDEN TRAIL RD EAST END AAC E A 785 36 26,820 81 64 36 0 Type II Slurry Seal $13,410 Surface Treatment - Slurry Seal 6/1/18 2025-27 326 1 WESTRIDGE LN LOST COLT DR SANDRIDGE CIR AAC E A 2,031 38 75,320 86 59 41 0 Prev. Maint. - Stop Gap $3,766 Overlay - AC Structural 8/1/12 2025-27 326 2 WESTRIDGE LN SANDRIDGE CIR MAVERICK CIR AAC E A 655 38 24,632 85 42 44 14 Prev. Maint. - Stop Gap $1,232 Overlay - AC Structural 8/1/12 2025-27 329 1 WHITE OAKS DR LAUREL CREST DR SOUTH END AAC E A 950 33 35,751 91 100 0 0 Prev. Maint. - Stop Gap $1,788 Overlay - AC Structural 8/1/14 2025-27 332 1 WILLOW TREE LN FALLING LEAF DR ROLLING HILLS RD AAC E A 275 33 11,023 95 100 0 0 Prev. Maint. - Stop Gap $551 Overlay - AC Structural 8/1/14 2025-27 334 1 WOOD BLUFF RD VISTA VIEJO ELDERBROOK LN AAC E A 1,142 37 40,496 92 67 33 0 Prev. Maint. - Stop Gap $2,025 Overlay - AC Structural 8/1/12 2025-27 334 2 WOOD BLUFF RD ELDERBROOK LN FALLING LEAF DR AAC E A 1,902 37 70,544 94 94 0 6 Prev. Maint. - Stop Gap $3,527 Overlay - AC Structural 8/1/14 2025-27 335 1 WOOD BROOK RD LAUREL CREST WEST END AAC E A 465 33 17,329 93 73 0 27 Prev. Maint. - Stop Gap $866 Overlay - AC Structural 8/1/14 $524,076
2025-27 57 1 BARENTS ST HILLARY LN GRISSOM RD AAC E D 1,300 33 43,337 85 56 37 7 Type II Slurry Seal $21,669 Surface Treatment - Slurry Seal 6/1/18 2025-27 57 2 BARENTS ST WILKES PL HILLARY LN AAC E D 135 33 4,764 95 100 0 0 Prev. Maint. - Stop Gap $238 Overlay - AC Fabric 8/1/14 2025-27 57 3 BARENTS ST WILKES PL EAST END AAC E D 1,310 36 46,447 86 50 42 8 Prev. Maint. - Stop Gap $2,322 Overlay - AC Structural 8/1/12

Page 2 of 8 ends
Page 484 of 570 ends

City of Laguna Hills, CA
Forecast Maintenance / Rehabilitation (FMR) Report - FY 2024-2031 Sorted by Rank, FY, Name Order (A-Z)
FY Branch ID Sec ID Name From To Type Rank Zone L W Area PCI PCI Pct Climate PCI Pct Load PCI Pct Other Maint. Type Total $ Last Work Type Last Work Date 2025-27 59 1 BAUTISTA DR PADUA DR SOUTH END AAC E D 455 33 18,690 88 60 40 0 Prev. Maint. - Stop Gap $935 Surface Treatment - Slurry Seal 6/1/18 2025-27 62 1 BENTLEY LN ALICIA PKWY EAST END AAC E D 1,555 38 57,924 90 53 22 25 Prev. Maint. - Stop Gap $2,896 Overlay - AC Structural 8/1/12 2025-27 65 1 BOONE PL CADALLAC DR SOUTH END AAC E D 170 43 8,064 81 32 68 0 Type II Slurry Seal $4,032 Surface Treatment - Slurry Seal 6/1/18 2025-27 75 1 CADILLAC DR GRISSOM RD BOONE PL AAC E D 575 33 18,649 83 47 37 16 Type II Slurry Seal $9,325 Surface Treatment - Slurry Seal 6/1/18 2025-27 75 2 CADILLAC DR BOONE PL HILLARY LN AAC E D 422 33 13,391 92 90 0 10 Prev. Maint. - Stop Gap $670 Overlay - AC Fabric 8/1/14 2025-27 76 1 CAJON DR WELLS FARGO DR COSTEAU DR AAC E D 560 37 17,551 88 77 12 11 Prev. Maint. - Stop Gap $878 Surface Treatment - Slurry Seal 6/1/18 2025-27 78 1 CALIFIA DR MACKENZIE ST LA SUEN RD AAC E D 865 36 30,061 81 54 43 3 Type II Slurry Seal $15,031 Surface Treatment - Slurry Seal 6/1/18 2025-27 86 1 CHAMPLAIN RD EARHART RD VESPUCCI RD AAC E D 830 35 23,057 92 73 27 0 Prev. Maint. - Stop Gap $1,153 Overlay - AC Structural 8/1/12 2025-27 86 2 CHAMPLAIN RD GRISSOM RD LAPAZ RD AAC E D 1,260 33 40,950 81 89 11 0 Type II Slurry Seal $20,475 Surface Treatment - Slurry Seal 6/1/18 2025-27 86 3 CHAMPLAIN RD PIKE RD CHARLEMAGNE RD AAC E D 725 33 25,502 85 57 43 0 Type II Slurry Seal $12,751 Overlay - AC Structural 8/1/12 2025-27 86 4 CHAMPLAIN RD CHAMPLAIN RD END AAC E D 114 33 6,073 90 100 0 0 Prev. Maint. - Stop Gap $304 Overlay - AC Structural 7/1/12 2025-27 88 1 CHARLEMAGNE RD CHAMPLAIN RD DE SALLE ST AAC E D 535 33 17,196 88 70 30 0 Prev. Maint. - Stop Gap $860 Overlay - AC Structural 8/1/12 2025-27 96 1 COSTEAU DR ALICIA PKWY CAJON DR AAC E D 1,980 36 70,756 84 38 57 5 Type II Slurry Seal $35,378 Surface Treatment - Slurry Seal 6/1/18 2025-27 103 1 DE SALLE ST MACKENZIE ST EARHART RD AAC E D 1,200 33 38,614 87 40 57 3 Prev. Maint. - Stop Gap $1,931 Overlay - AC Structural 8/1/12 2025-27 103 2 DE SALLE ST EARHART RD GRISSOM RD AAC E D 1,239 33 38,918 83 48 52 0 Type II Slurry Seal $19,459 Overlay - AC Structural 8/1/12 2025-27 112 1 EARHART RD BARENTS ST VELASQUEZ RD AAC E D 862 37 29,700 87 51 49 0 Prev. Maint. - Stop Gap $1,485 Overlay - AC Structural 8/1/12 2025-27 112 2 EARHART RD DE SALLE DR CHAMPLAIN RD AAC E D 485 33 16,756 92 72 28 0 Prev. Maint. - Stop Gap $838 Overlay - AC Structural 8/1/12 2025-27 112 3 EARHART RD DE SALLE DR ERICSON WY AAC E D 240 33 7,826 72 89 7 4 Type II Slurry Seal $3,913 Overlay - AC Structural 7/1/11 2025-27 112 4 EARHART RD ERICSON WY LAS BOLSAS ST AC E D 255 33 9,265 77 60 34 6 Type II Slurry Seal $4,633 Patching - AC Deep 8/1/14 2025-27 112 5 EARHART RD VELASQUEZ RD LAS BOLSAS ST AAC E D 1,168 37 41,943 85 57 43 0 Type II Slurry Seal $20,972 Overlay - AC Structural 8/1/12 2025-27 112 6 EARHART RD EARHART RD SOUTH END AAC E D 118 33 6,192 96 100 0 0 Prev. Maint. - Stop Gap $310 Overlay - AC Fabric 8/1/14 2025-27 115 1 EL DORADO DR STAGE COACH DR PRESIDIO DR AAC E D 860 33 27,880 83 39 59 2 Type II Slurry Seal $13,940 Surface Treatment - Slurry Seal 6/1/18 2025-27 123 1 ERICSON WY COSTEAU DR EARHART RD AAC E D 1,105 37 38,951 85 62 33 5 Type II Slurry Seal $19,476 Overlay - AC Structural 7/1/11 2025-27 123 2 ERICSON WY EARHART RD PASEO DE VALENCIA AAC E D 1,393 37 49,085 74 33 33 34 Type II Slurry Seal $24,543 Overlay - AC Structural 7/1/11 2025-27 127 1 EVERGREEN RD OAK LEAF RD FIR LN AAC E D 800 37 28,763 80 75 8 17 Type II Slurry Seal $14,382 Surface Treatment - Slurry Seal 6/1/18 2025-27 128 1 EXPRESS DR ELDORADO DR WEST END AAC E D 600 36 21,816 86 79 21 0 Prev. Maint. - Stop Gap $1,091 Surface Treatment - Slurry Seal 6/1/18 2025-27 132 1 FIR LN EVERGREEN RD TREE TOP RD AAC E D 250 37 11,957 92 71 29 0 Prev. Maint. - Stop Gap $598 Overlay - AC Structural 8/1/12 2025-27 144 1 GRISSOM CIR HILLARY LN WEST END AAC E D 120 47 6,001 93 100 0 0 Prev. Maint. - Stop Gap $300 Overlay - AC Structural 7/1/14 2025-27 145 1 GRISSOM RD PIKE RD LA PAZ RD AC E D 125 33 4,415 84 100 0 0 Type II Slurry Seal $2,208 Surface Treatment - Slurry Seal 6/1/18 2025-27 145 2 GRISSOM RD BARENTS ST EAST END AAC E D 925 35 28,657 80 42 56 2 Type II Slurry Seal $14,329 Surface Treatment - Slurry Seal 6/1/18 2025-27 145 3 GRISSOM RD LAS BOLSAS ST WILKES PL AAC E D 1,785 33 57,687 95 85 4 11 Prev. Maint. - Stop Gap $2,884 Overlay - AC Fabric 8/1/14 2025-27 145 4 GRISSOM RD MACKENZIE ST WEST END AAC E D 535 36 19,372 88 67 0 33 Prev. Maint. - Stop Gap $969 Surface Treatment - Slurry Seal 6/1/18 2025-27 145 5 GRISSOM RD ERICSON WY PIKE RD AAC E D 1,000 35 29,111 81 65 33 2 Type II Slurry Seal $14,556 Overlay - AC Structural 7/1/11 2025-27 145 6 GRISSOM RD GRISSOM RD NORTH END AAC E D 132 33 6,783 82 88 11 1 Type II Slurry Seal $3,392 Overlay - AC Structural 7/1/11 2025-27 147 1 HARTOG ST VELASQUEZ RD LAS BOLSAS ST AAC E D 875 31 26,627 93 60 34 6 Prev. Maint. - Stop Gap $1,331 Overlay - AC Fabric 8/1/14 2025-27 151 1 HILLARY LN BARENTS ST PASEO DE VALENCIA AAC E D 1,050 37 42,219 91 77 0 23 Prev. Maint. - Stop Gap $2,111 Overlay - AC Fabric 8/1/14 2025-27 161 1 KNOTTY PINE RD McINTYRE ST MACKENZIE ST AAC E D 525 33 19,009 83 100 0 0 Type II Slurry Seal $9,505 Surface Treatment - Slurry Seal 6/1/18 2025-27 168 1 LA SUEN RD CALIFIA DR PIKE RD AAC E D 1,000 36 39,176 89 83 0 17 Prev. Maint. - Stop Gap $1,959 Surface Treatment - Slurry Seal 6/1/18 2025-27 172 1 LAS BOLSAS ST TASMAN RD GRISSOM RD AAC E D 1,830 33 60,223 88 54 46 0 Prev. Maint. - Stop Gap $3,011 Overlay - AC Structural 8/1/12 2025-27 324 1 MACKENZIE CT MACKENZIE ST SOUTH END AC E D 85 60 5,045 84 17 83 0 Type II Slurry Seal $2,523 Surface Treatment - Slurry Seal 6/1/18 2025-27 189 1 MACKENZIE ST LA PAZ RD KNOTTY PINE RD AAC E D 888 33 30,465 89 88 0 12 Prev. Maint. - Stop Gap $1,523 Overlay - AC Fabric 8/1/14 2025-27 189 2 MACKENZIE ST KNOTTY PINE RD LA PAZ RD AAC E D 919 37 31,724 90 82 18 0 Prev. Maint. - Stop Gap $1,586 Overlay - AC Fabric 8/1/14 2025-27 189 3 MACKENZIE ST PIKE RD CALIFIA DR AAC E D 988 37 35,635 89 87 0 13 Prev. Maint. - Stop Gap $1,782 Surface Treatment - Slurry Seal 6/1/18 2025-27 189 4 MACKENZIE ST CALIFIA DR COUTEAU DR AAC E D 1,542 37 54,141 88 98 2 0 Prev. Maint. - Stop Gap $2,707 Surface Treatment - Slurry Seal 6/1/18 2025-27 190 1 MADEIRA DR PADUA DR SOUTH END AAC E D 290 33 12,919 82 53 47 0 Type II Slurry Seal $6,460 Surface Treatment - Slurry Seal 6/1/18 2025-27 197 1 MAWSON DR WILKES PL VELASQUEZ RD AAC E D 911 33 29,519 94 89 0 11 Prev. Maint. - Stop Gap $1,476 Overlay - AC Fabric 8/1/14 2025-27 197 2 MAWSON DR VELASQUEZ RD LAS BOLSAS ST AAC E D 1,063 33 33,399 93 93 0 7 Prev. Maint. - Stop Gap $1,670 Overlay - AC Fabric 8/1/14 2025-27 198 1 McINTYRE ST PIKE RD LA PAZ RD AAC E D 120 33 4,419 89 53 47 0 Prev. Maint. - Stop Gap $221 Surface Treatment - Slurry Seal 6/1/18 2025-27 198 2 McINTYRE ST LA PAZ RD EVERGREEN RD AAC E D 1,500 37 54,783 93 68 32 0 Prev. Maint. - Stop Gap $2,739 Overlay - AC Structural 8/1/12 2025-27 207 1 MODOC DR PADUA DR SOUTH END AAC E D 475 37 19,389 88 76 0 24 Prev. Maint. - Stop Gap $969 Surface Treatment - Slurry Seal 6/1/18 2025-27 216 1 NORTHRUP DR VELASQUEZ RD LAS BOLSAS ST AAC E D 1,400 33 46,888 90 100 0 0 Prev. Maint. - Stop Gap $2,344 Overlay - AC Fabric 8/1/14 2025-27 219 1 OAK LEAF RD SPRUCE LN EVERGREEN RD AAC E D 860 37 33,484 77 37 63 0 Type II Slurry Seal $16,742 Surface Treatment - Slurry Seal 6/1/18 2025-27 220 1 ORELLANO WY PIKE RD NORTH END AAC E D 870 36 27,834 86 93 0 7 Prev. Maint. - Stop Gap $1,392 Overlay - AC Fabric 8/1/14 2025-27 220 2 ORELLANO WY ORELLANO WY END AAC E D 105 33 5,745 89 95 0 5 Prev. Maint. - Stop Gap $287 Overlay - AC Structural 7/1/14 2025-27 222 1 OVERLAND DR CAJON DR WEST END AAC E D 570 36 20,437 90 100 0 0 Prev. Maint. - Stop Gap $1,022 Surface Treatment - Slurry Seal 6/1/18 2025-27 224 1 PADUA DR LA SUEN RD MACKENZIE ST AAC E D 885 36 31,702 88 60 40 0 Prev. Maint. - Stop Gap $1,585 Surface Treatment - Slurry Seal 6/1/18 2025-27 227 1 PASEO DE ALICIA ALICIA PKWY EAST END AAC E D 260 60 15,172 85 47 42 11 Type II Slurry Seal $7,586 Overlay - AC Structural 8/1/12 2025-27 233 1 PIKE RD LA SUEN RD MACKENZIE ST AAC E D 962 33 32,366 85 49 48 3 Type II Slurry Seal $16,183 Surface Treatment - Slurry Seal 6/1/18 2025-27 233 2 PIKE RD MACKENZIE ST GRISSOM RD AAC E D 1,157 33 37,217 87 39 53 8 Prev. Maint. - Stop Gap $1,861 Overlay - AC Structural 8/1/12 2025-27 234 1 PINE NUT RD TREE TOP RD PASEO DE VALENCIA AAC E D 120 37 5,110 94 89 0 11 Prev. Maint. - Stop Gap $256 Overlay - AC Structural 8/1/12 2025-27 236 1 PINEWOOD LN WEST END OAK LEAF RD AAC E D 235 33 10,244 81 47 38 15 Type II Slurry Seal $5,122 Surface Treatment - Slurry Seal 6/1/18 2025-27 243 1 PRESIDO DR EL DORADO DR CALIFIA DR AAC E D 490 36 18,476 87 50 50 0 Prev. Maint. - Stop Gap $924 Surface Treatment - Slurry Seal 6/1/18 2025-27 250 1 RICKENBACKER RD PIKE RD LA PAZ RD AAC E D 135 33 4,867 86 45 55 0 Prev. Maint. - Stop Gap $243 Surface Treatment - Slurry Seal 6/1/18 2025-27 285 1 SPRUCE LN WEST END OAK LEAF RD AAC E D 330 42 13,199 81 58 42 0 Type II Slurry Seal $6,600 Surface Treatment - Slurry Seal 6/1/18 2025-27 287 1 STAGE COACH DR MACKENZIE ST EL DORADO DR AAC E D 625 37 24,100 85 57 40 3 Type II Slurry Seal $12,050 Surface Treatment - Slurry Seal 6/1/18 2025-27 297 1 SUTTER DR EL DORADO DR WEST END AAC E D 600 36 22,524 83 37 63 0 Type II Slurry Seal $11,262 Surface Treatment - Slurry Seal 6/1/18 2025-27 298 1 SYCAMORE LN McINTYRE ST WEST END AAC E D 110 27 2,739 87 91 0 9 Prev. Maint. - Stop Gap $137 Surface Treatment - Slurry Seal 6/1/18 2025-27 301 1 TASMAN RD ERICSON WY VELASQUEZ RD AAC E D 985 33 31,308 88 94 0 6 Prev. Maint. - Stop Gap $1,565 Overlay - AC Fabric 8/1/14 2025-27 310 1 TREE TOP RD FIR LN EAST END AAC E D 930 37 35,023 90 55 21 24 Prev. Maint. - Stop Gap $1,751 Overlay - AC Structural 8/1/12 2025-27 312 1 VALERIE ST BENTLEY LN COSTEAU DR AAC E D 225 36 8,627 81 36 64 0 Type II Slurry Seal $4,314 Overlay - AC Structural 7/1/11 2025-27 313 1 VELASQUEZ RD TASMAN RD NORTHRUP DR AAC E D 610 33 20,363 89 97 0 3 Prev. Maint. - Stop Gap $1,018 Overlay - AC Fabric 8/1/14 2025-27 313 2 VELASQUEZ RD MAWSON DR EARHART AAC E D 288 33 9,661 77 80 20 0 Type II Slurry Seal $4,831 Patching - AC Deep 8/1/14

Page 3 of 8 ends
Page 485 of 570 ends

City of Laguna Hills, CA
Forecast Maintenance / Rehabilitation (FMR) Report - FY 2024-2031 Sorted by Rank, FY, Name Order (A-Z)
FY Branch ID Sec ID Name From To Type Rank Zone L W Area PCI PCI Pct Climate PCI Pct Load PCI Pct Other Maint. Type Total $ Last Work Type Last Work Date 2025-27 313 3 VELASQUEZ RD GRISSOM RD PASEO DE VALENCIA AC E D 145 33 5,469 79 63 31 6 Type II Slurry Seal $2,735 Patching - AC Deep 8/1/14 2025-27 313 4 VELASQUEZ RD TASMAN RD COSTEAU DR AAC E D 260 33 8,983 94 100 0 0 Prev. Maint. - Stop Gap $449 Overlay - AC Fabric 8/1/14 2025-27 313 5 VELASQUEZ RD EARHART NORTHRUP AAC E D 276 33 9,411 79 73 21 6 Type II Slurry Seal $4,706 Patching - AC Deep 8/1/14 2025-27 317 1 VESPUCCI RD CHAMPLAIN RD DE SALLE ST AAC E D 160 33 6,456 92 96 0 4 Prev. Maint. - Stop Gap $323 Overlay - AC Structural 8/1/12 2025-27 317 2 VESPUCCI RD LAS BOLSAS ST VELASQUEZ RD AAC E D 1,055 33 34,292 92 84 0 16 Prev. Maint. - Stop Gap $1,715 Overlay - AC Fabric 8/1/14 2025-27 325 1 WELLS FARGO DR CAJON DR MACKENZIE ST AAC E D 625 37 23,911 87 50 50 0 Prev. Maint. - Stop Gap $1,196 Surface Treatment - Slurry Seal 6/1/18 2025-27 328 1 WHITE ALDER LN McINTYRE ST OAK LEAF RD AAC E D 435 37 16,224 83 80 0 20 Type II Slurry Seal $8,112 Surface Treatment - Slurry Seal 6/1/18 2025-27 331 2 WILKES PL GRISSOM RD ALICIA PKWY AAC E D 1,125 33 37,401 94 100 0 0 Prev. Maint. - Stop Gap $1,870 Overlay - AC Fabric 8/1/14 $456,868
2027-29 345 1 ANVIL CIR FARRIER CIR NORTH END AAC E B 707 33 28,842 95 100 0 0 Prev. Maint. - Stop Gap $1,731 Surface Treatment - Slurry Seal 11/1/21 2027-29 52 1 APPALOOSA PL MUSTANG DR N CNR LA PAZ RD S CNR AAC E B 240 35 9,839 89 24 76 0 Type II Slurry Seal $5,411 Surface Treatment - Slurry Seal 11/1/21 2027-29 67 1 BOOTSTRAP PL GALLUP CIR WEST END AAC E B 175 44 8,026 91 100 0 0 Type II Slurry Seal $4,414 Surface Treatment - Slurry Seal 11/1/21 2027-29 69 1 BRIDLEWOOD DR FLINTLOCK LN NELLIE GAIL RD AAC E B 490 39 17,957 95 100 0 0 Prev. Maint. - Stop Gap $1,077 Surface Treatment - Slurry Seal 11/1/21 2027-29 69 3 BRIDLEWOOD DR OSO PKWY SADDLE ROCK PL AAC E B 220 36 8,796 99 100 0 0 Prev. Maint. - Stop Gap $528 Surface Treatment - Slurry Seal 11/1/21 2027-29 69 5 BRIDLEWOOD DR SADDLE ROCK PL FLINTLOCK LN AAC E B 755 41 27,758 95 100 0 0 Prev. Maint. - Stop Gap $1,665 Surface Treatment - Slurry Seal 11/1/21 2027-29 70 1 BROKEN BIT LN BUCKSKIN DR SOUTH END AAC E B 785 36 29,498 89 80 20 0 Type II Slurry Seal $16,224 Surface Treatment - Slurry Seal 11/1/21 2027-29 71 1 BUCKBOARD LN BUCKSKIN DR STENSON PL AAC E B 1,217 39 45,760 75 73 27 0 Type II Slurry Seal $25,168 Surface Treatment - Slurry Seal 11/1/21 2027-29 71 2 BUCKBOARD LN STENSON PL NELLIE GAIL RD AAC E B 1,691 39 62,796 80 55 43 2 Type II Slurry Seal $34,538 Overlay - AC Structural 7/1/11 2027-29 72 1 BUCKLESTONE CT NELLIE GAIL RD NORTH END AAC E B 350 39 14,001 93 100 0 0 Prev. Maint. - Stop Gap $840 Surface Treatment - Slurry Seal 11/1/21 2027-29 73 1 BUCKSKIN DR NELLIE GAIL RD SILVER SADDLE LN AAC E B 1,329 39 49,275 100 0 0 0 Prev. Maint. - Stop Gap $2,957 Overlay - AC Structural 11/1/21 2027-29 73 2 BUCKSKIN DR SILVER SADDLE LN MUSTANG DR AAC E B 904 39 33,689 100 0 0 0 Prev. Maint. - Stop Gap $2,021 Overlay - AC Structural 11/1/21 2027-29 73 3 BUCKSKIN DR MUSTANG DR BUCKBOARD LN AAC E B 1,001 39 38,062 100 0 0 0 Prev. Maint. - Stop Gap $2,284 Overlay - AC Structural 11/1/21 2027-29 87 1 CHAPARREL PL NELLIE GAIL RD SOUTH END AAC E B 155 46 8,681 93 100 0 0 Prev. Maint. - Stop Gap $521 Surface Treatment - Slurry Seal 11/1/21 2027-29 102 1 DAPPLE GREY DR NELLIE GAIL DR S CNR WILD VIEW TER AAC E B 667 34 21,927 91 100 0 0 Type II Slurry Seal $12,060 Surface Treatment - Slurry Seal 11/1/21 2027-29 102 2 DAPPLE GREY DR WILD VIEW TER NELLIE GAIL RD AAC E B 1,624 34 54,591 92 100 0 0 Prev. Maint. - Stop Gap $3,275 Overlay - AC Structural 7/1/11 2027-29 109 1 DESERT TRAIL NELLIE GAIL DR SOUTH END AAC E B 525 37 19,628 97 100 0 0 Prev. Maint. - Stop Gap $1,178 Surface Treatment - Slurry Seal 11/1/21 2027-29 344 1 FARRIER CIR MUSTANG DR NORTH END AAC E B 571 33 22,482 98 100 0 0 Prev. Maint. - Stop Gap $1,349 Surface Treatment - Slurry Seal 11/1/21 2027-29 134 1 FLINTLOCK LN BRIDLEWOOD DR NORTH END AAC E B 1,015 36 35,808 91 100 0 0 Type II Slurry Seal $19,694 Surface Treatment - Slurry Seal 11/1/21 2027-29 136 1 GALLUP CIR LA PAZ RD RANGEWOOD RD AAC E B 1,908 39 70,021 95 100 0 0 Prev. Maint. - Stop Gap $4,201 Surface Treatment - Slurry Seal 11/1/21 2027-29 136 2 GALLUP CIR RANGEWOOD RD NELLIE GAIL RD AAC E B 1,034 37 38,328 95 100 0 0 Prev. Maint. - Stop Gap $2,300 Surface Treatment - Slurry Seal 11/1/21 2027-29 139 1 GLEN CANYON DR NELLIE GAIL RD SOUTH END AAC E B 1,985 38 70,050 91 100 0 0 Type II Slurry Seal $38,528 Surface Treatment - Slurry Seal 11/1/21 2027-29 139 2 GLEN CANYON DR BRIDLEWOOD DR END AAC E B 146 33 7,105 95 100 0 0 Prev. Maint. - Stop Gap $426 Surface Treatment - Slurry Seal 11/1/21 2027-29 149 1 HIGHPLAINS TER GLEN CANYON DR EAST END AAC E B 515 37 19,710 93 100 0 0 Prev. Maint. - Stop Gap $1,183 Surface Treatment - Slurry Seal 11/1/21 2027-29 152 1 HITCHING RAIL RD PRIARESTONE DR NELLIE GAIL RD AAC E B 1,150 39 44,158 96 100 0 0 Prev. Maint. - Stop Gap $2,649 Overlay - AC Structural 7/1/11 2027-29 152 2 HITCHING RAIL RD CABOT RD TOMBSTONE RD AAC E B 430 39 15,589 98 100 0 0 Prev. Maint. - Stop Gap $935 Overlay - AC Structural 7/1/07 2027-29 152 3 HITCHING RAIL RD TOMBSTONE RD PRIARESTONE DR AAC E B 1,410 39 59,753 95 100 0 0 Prev. Maint. - Stop Gap $3,585 Overlay - AC Structural 7/1/11 2027-29 343 1 HORSESHOE CIR RED CORRAL RD SOUTH END AAC E B 396 33 16,167 98 100 0 0 Prev. Maint. - Stop Gap $970 Surface Treatment - Slurry Seal 11/1/21 2027-29 154 1 HOUSTON TRAIL NELLIE GAIL RD SOUTH END AAC E B 860 36 31,566 98 100 0 0 Prev. Maint. - Stop Gap $1,894 Surface Treatment - Slurry Seal 11/1/21 2027-29 212 1 MT DIABLO RD GLEN CANYON DR SOUTH END AAC E B 1,300 36 46,307 89 76 24 0 Type II Slurry Seal $25,469 Surface Treatment - Slurry Seal 11/1/21 2027-29 213 1 MUSTANG DR NELLIE GAIL RD FARRIER AAC E B 648 39 23,933 92 100 0 0 Prev. Maint. - Stop Gap $1,436 Overlay - AC Structural 7/1/11 2027-29 213 2 MUSTANG DR FARRIER APPALOOSA PL AAC E B 1,372 39 51,031 92 100 0 0 Prev. Maint. - Stop Gap $3,062 Surface Treatment - Slurry Seal 11/1/21 2027-29 213 3 MUSTANG DR APPALOOSA PL BUCKSKIN DR AAC E B 1,417 39 53,199 94 100 0 0 Prev. Maint. - Stop Gap $3,192 Surface Treatment - Slurry Seal 11/1/21 2027-29 25 1 NELLIE GAIL RD OSO PKWY DAPPLE GREY DR AAC E B 468 24 17,591 96 54 0 46 Prev. Maint. - Stop Gap $1,055 Crack Sealing - AC 2/12/08 2027-29 25 18 NELLIE GAIL RD SHERIFF RD PRAIRIESTONE DR AAC E B 704 38 25,935 96 100 0 0 Prev. Maint. - Stop Gap $1,556 Surface Treatment - Slurry Seal 11/1/21 2027-29 25 19 NELLIE GAIL RD BUCKLESTONE CT SHERIFF RD AAC E B 849 38 31,480 96 100 0 0 Prev. Maint. - Stop Gap $1,889 Surface Treatment - Slurry Seal 11/1/21 2027-29 25 2 NELLIE GAIL RD DAPPLE GREY DR BUCKBOARD LN AAC E B 470 38 18,795 93 75 0 25 Prev. Maint. - Stop Gap $1,128 Crack Sealing - AC 2/12/08 2027-29 25 20 NELLIE GAIL RD BUCKLESTONE CT CABOT RD AAC E B 758 38 29,011 97 100 0 0 Prev. Maint. - Stop Gap $1,741 Surface Treatment - Slurry Seal 11/1/21 2027-29 25 21 NELLIE GAIL RD NELLIE GAIL RD RED CORRAL AAC E B 665 38 24,728 96 100 0 0 Prev. Maint. - Stop Gap $1,484 Surface Treatment - Slurry Seal 11/1/21 2027-29 25 3 NELLIE GAIL RD BUCKBOARD LN CHAPARRAL PL AAC E B 1,284 38 47,504 97 100 0 0 Prev. Maint. - Stop Gap $2,850 Crack Sealing - AC 2/12/08 2027-29 25 4 NELLIE GAIL RD CHAPARRAL PL HOUSTON TR AAC E B 593 38 22,731 95 100 0 0 Prev. Maint. - Stop Gap $1,364 Crack Sealing - AC 2/12/08 2027-29 25 5 NELLIE GAIL RD PRAIRIESTONE DR GLEN CANYON DR AAC E B 714 38 27,037 96 100 0 0 Prev. Maint. - Stop Gap $1,622 Surface Treatment - Slurry Seal 11/1/21 2027-29 25 6 NELLIE GAIL RD RED CORRAL RD GALLUP CIR AAC E B 854 38 30,993 97 100 0 0 Prev. Maint. - Stop Gap $1,860 Surface Treatment - Slurry Seal 11/1/21 2027-29 25 7 NELLIE GAIL RD GLEN CANYON DR GALLUP CIR AAC E B 575 38 22,910 98 100 0 0 Prev. Maint. - Stop Gap $1,375 Surface Treatment - Slurry Seal 11/1/21 2027-29 25 8 NELLIE GAIL RD HOUSTON TR MUSTANG DR AAC E B 492 38 17,973 96 100 0 0 Prev. Maint. - Stop Gap $1,078 Crack Sealing - AC 2/12/08 2027-29 25 9 NELLIE GAIL RD MUSTANG DR BRIDLEWOOD DR AAC E B 409 38 15,544 95 54 46 0 Prev. Maint. - Stop Gap $933 Crack Sealing - AC 2/12/08 2027-29 221 1 OROVILLE PL MT DIABLO RD SOUTH END AAC E B 605 37 24,466 93 66 34 0 Prev. Maint. - Stop Gap $1,468 Surface Treatment - Slurry Seal 11/1/21 2027-29 230 1 PECOS RD HITCHING RAIL RD WEST END AAC E B 1,220 36 43,924 92 100 0 0 Prev. Maint. - Stop Gap $2,635 Surface Treatment - Slurry Seal 11/1/21 2027-29 240 1 POKER FLATS PL NELLIE GAIL RD NORTH END AAC E B 310 40 12,786 98 100 0 0 Prev. Maint. - Stop Gap $767 Surface Treatment - Slurry Seal 11/1/21 2027-29 242 1 PRAIRESTONE DR NELLIE GAIL RD HITCHING RAIL RD AAC E B 1,525 39 53,006 92 100 0 0 Prev. Maint. - Stop Gap $3,180 Surface Treatment - Slurry Seal 11/1/21 2027-29 245 1 RANGEWOOD RD GALLUP CIR EAST END AAC E B 1,290 36 46,135 94 100 0 0 Prev. Maint. - Stop Gap $2,768 Overlay - AC Structural 7/1/11 2027-29 247 1 RED CORRAL RD NELLIE GAIL RD HORSESHOE AAC E B 1,370 34 44,839 94 100 0 0 Prev. Maint. - Stop Gap $2,690 Surface Treatment - Slurry Seal 11/1/21 2027-29 247 2 RED CORRAL RD HORSESHOE MUSTANG DR AAC E B 1,003 34 32,473 95 100 0 0 Prev. Maint. - Stop Gap $1,948 Surface Treatment - Slurry Seal 11/1/21 2027-29 249 1 RICH SPRINGS CIR HITCHING RAIL RD WEST END AAC E B 175 44 8,147 95 100 0 0 Prev. Maint. - Stop Gap $489 Surface Treatment - Slurry Seal 11/1/21 2027-29 259 1 SADDLEHORN LN BUCKSKIN LN SOUTH END AAC E B 315 39 13,308 80 94 0 6 Type II Slurry Seal $7,319 Surface Treatment - Slurry Seal 11/1/21 2027-29 260 1 SADDLEROCK PL BRIDLEWOOD DR WEST END AAC E B 540 37 20,465 95 100 0 0 Prev. Maint. - Stop Gap $1,228 Surface Treatment - Slurry Seal 11/1/21 2027-29 274 1 SHERIFF RD NELLIE GAIL RD EAST END AAC E B 775 36 30,529 93 100 0 0 Prev. Maint. - Stop Gap $1,832 Surface Treatment - Slurry Seal 11/1/21 2027-29 276 1 SILVER SADDLE LN BUCKSKIN DR SOUTH END AAC E B 315 39 13,194 82 55 43 2 Type II Slurry Seal $7,257 Surface Treatment - Slurry Seal 11/1/21 2027-29 279 1 SORRELL PL BUCKSKIN DR EAST END AAC E B 280 34 11,593 88 100 0 0 Type II Slurry Seal $6,376 Surface Treatment - Slurry Seal 11/1/21 2027-29 286 1 SPUR BRANCH LN HITCHING RAIL RD EAST END AAC E B 760 36 28,184 94 100 0 0 Prev. Maint. - Stop Gap $1,691 Surface Treatment - Slurry Seal 11/1/21 2027-29 290 1 STENSON PL BUCKSBOARD LN NORTH END AAC E B 625 39 22,856 85 60 40 0 Type II Slurry Seal $12,571 Surface Treatment - Slurry Seal 11/1/21 2027-29 308 1 TOMBSTONE RD OSO PKWY HITCHING RAIL RD AAC E B 315 20 6,913 91 45 55 0 Type II Slurry Seal $3,802 Surface Treatment - Slurry Seal 11/1/21 2027-29 323 1 WATERWHEEL PL HITCHING RAIL RD EAST END AAC E B 390 38 15,558 91 100 0 0 Type II Slurry Seal $8,557 Surface Treatment - Slurry Seal 11/1/21

Page 4 of 8 ends
Page 486 of 570 ends

City of Laguna Hills, CA
Forecast Maintenance / Rehabilitation (FMR) Report - FY 2024-2031 Sorted by Rank, FY, Name Order (A-Z)
FY Branch ID Sec ID Name From To Type Rank Zone L W Area PCI PCI Pct Climate PCI Pct Load PCI Pct Other Maint. Type Total $ Last Work Type Last Work Date 2027-29 330 1 WILD VIEW TER DAPPLE GREY DR SOUTH END AAC E B 410 38 16,974 92 100 0 0 Prev. Maint. - Stop Gap $1,018 Surface Treatment - Slurry Seal 11/1/21 $314,297
2027-29 42 1 ADAMO SORESINA END AC E F 308 35 16,544 91 100 0 0 Type II Slurry Seal $9,099 Surface Treatment - Slurry Seal 11/1/21 2027-29 43 1 ALCALDE DR VERDUGO DR PERALTA DR AAC E F 1,560 43 64,688 92 100 0 0 Prev. Maint. - Stop Gap $3,881 Surface Treatment - Slurry Seal 11/1/21 2027-29 50 1 ANCONA TREVISO END AAC E F 306 35 18,073 93 100 0 0 Prev. Maint. - Stop Gap $1,084 Surface Treatment - Slurry Seal 11/1/21 2027-29 56 1 BARBERA SANTA VITTORIA MARSALA AAC E F 303 39 9,707 90 100 0 0 Type II Slurry Seal $5,339 Surface Treatment - Slurry Seal 11/1/21 2027-29 56 2 BARBERA MARSALA PESARO AAC E F 1,179 39 42,593 90 100 0 0 Type II Slurry Seal $23,426 Surface Treatment - Slurry Seal 11/1/21 2027-29 63 1 BIANCO MARSALA END AAC E F 348 35 15,781 92 100 0 0 Prev. Maint. - Stop Gap $947 Surface Treatment - Slurry Seal 11/1/21 2027-29 84 1 CATANIA CREMONA END AAC E F 255 35 10,506 93 100 0 0 Prev. Maint. - Stop Gap $630 Surface Treatment - Slurry Seal 11/1/21 2027-29 93 1 COLONNA SORESINA PESARO AAC E F 570 35 19,350 90 73 27 0 Type II Slurry Seal $10,643 Surface Treatment - Slurry Seal 11/1/21 2027-29 9 1 COMMERCE CENTER DR AVE DE LA CARLOTA END AAC E F 983 46 42,461 94 100 0 0 Prev. Maint. - Stop Gap $2,548 Surface Treatment - Slurry Seal 11/1/21 2027-29 100 1 CREMONA TARANTO END AAC E F 319 35 13,106 93 100 0 0 Prev. Maint. - Stop Gap $786 Surface Treatment - Slurry Seal 11/1/21 2027-29 104 1 DEL LAGO DR ALCALDE DR LA CADENA DR AAC E F 1,160 44 47,409 92 100 0 0 Prev. Maint. - Stop Gap $2,845 Surface Treatment - Slurry Seal 11/1/21 2027-29 104 2 DEL LAGO DR LA CADENA DR LAKE FOREST DR AAC E F 870 64 53,578 91 100 0 0 Type II Slurry Seal $29,468 Surface Treatment - Slurry Seal 11/1/21 2027-29 116 1 EL PACIFICO DR VERDUGO DR END AAC E F 235 43 13,362 93 100 0 0 Prev. Maint. - Stop Gap $802 Surface Treatment - Slurry Seal 11/1/21 2027-29 116 2 EL PACIFICO DR MOULTON PKWY VERDUGO DR AAC E F 300 64 18,126 92 100 0 0 Prev. Maint. - Stop Gap $1,088 Surface Treatment - Slurry Seal 11/1/21 2027-29 135 1 FORMELLO BARBERA END AAC E F 378 35 15,607 93 100 0 0 Prev. Maint. - Stop Gap $936 Surface Treatment - Slurry Seal 11/1/21 2027-29 137 1 GENOVA PALERMO END AAC E F 562 35 23,671 92 100 0 0 Prev. Maint. - Stop Gap $1,420 Surface Treatment - Slurry Seal 11/1/21 2027-29 143 1 GRAVINO PESARO END AAC E F 280 35 12,328 93 100 0 0 Prev. Maint. - Stop Gap $740 Surface Treatment - Slurry Seal 11/1/21 2027-29 17 1 LA CADENA DR PERALTA DR DEL LAGO DR AAC E F 541 40 22,248 92 100 0 0 Prev. Maint. - Stop Gap $1,335 Surface Treatment - Slurry Seal 11/1/21 2027-29 17 2 LA CADENA DR VERDUGO DR DEL LAGO DR AAC E F 709 40 29,708 92 100 0 0 Prev. Maint. - Stop Gap $1,782 Surface Treatment - Slurry Seal 11/1/21 2027-29 176 1 LIPARI TERAMO END AAC E F 368 35 17,337 93 100 0 0 Prev. Maint. - Stop Gap $1,040 Surface Treatment - Slurry Seal 11/1/21 2027-29 177 1 LOMBARDI PASERO END AAC E F 315 35 13,789 92 44 56 0 Prev. Maint. - Stop Gap $827 Surface Treatment - Slurry Seal 11/1/21 2027-29 195 1 MARSALA BARBERA END AAC E F 967 39 35,878 93 100 0 0 Prev. Maint. - Stop Gap $2,153 Surface Treatment - Slurry Seal 11/1/21 2027-29 202 1 MESSINA COLONNA END AAC E F 226 35 9,627 93 100 0 0 Prev. Maint. - Stop Gap $578 Surface Treatment - Slurry Seal 11/1/21 2027-29 204 1 MILANO TARANTO MONTOVA AAC E F 198 35 7,593 91 100 0 0 Type II Slurry Seal $4,176 Surface Treatment - Slurry Seal 11/1/21 2027-29 22 1 MILL CREEK DR LAKE FOREST DR NORTH END OF BRIDGE AAC E F 1,064 40 36,606 100 88 0 12 Prev. Maint. - Stop Gap $2,196 Overlay - AC Structural 11/1/21 2027-29 22 2 MILL CREEK DR SOUTH END OF BRIDGE RIDGE ROUTE DR AAC E F 2,703 40 106,442 100 84 5 11 Prev. Maint. - Stop Gap $6,387 Overlay - AC Structural 11/1/21 2027-29 22 2 MILL CREEK DR SOUTH END OF BRIDGE RIDGE ROUTE DR AAC E F 2,703 40 106,442 100 84 5 11 Prev. Maint. - Stop Gap $6,387 Surface Treatment - Slurry Seal 11/1/21 2027-29 206 1 MODINA FORMELLO END AAC E F 296 35 14,059 93 100 0 0 Prev. Maint. - Stop Gap $844 Surface Treatment - Slurry Seal 11/1/21 2027-29 209 1 MONTOVA MILANO END AAC E F 268 35 11,707 90 100 0 0 Type II Slurry Seal $6,439 Surface Treatment - Slurry Seal 11/1/21 2027-29 214 1 NAPOLI PALERMO END AAC E F 495 35 18,566 93 100 0 0 Prev. Maint. - Stop Gap $1,114 Surface Treatment - Slurry Seal 11/1/21 2027-29 223 1 PADOVA MARSALA END AAC E F 268 35 12,620 94 100 0 0 Prev. Maint. - Stop Gap $757 Surface Treatment - Slurry Seal 11/1/21 2027-29 226 1 PALERMO SAN REMO DR TARANTO AAC E F 964 35 31,074 92 100 0 0 Prev. Maint. - Stop Gap $1,864 Surface Treatment - Slurry Seal 11/1/21 2027-29 29 1 PERALTA DR LA CADENA DR ALCALDE DR AAC E F 1,346 40 53,502 93 100 0 0 Prev. Maint. - Stop Gap $3,210 Surface Treatment - Slurry Seal 11/1/21 2027-29 29 2 PERALTA DR ALCADE DR RIDGE ROUTE DR AAC E F 570 40 20,693 90 100 0 0 Type II Slurry Seal $11,381 Surface Treatment - Slurry Seal 11/1/21 2027-29 232 1 PESARO SAN REMO DR END AAC E F 850 42 32,684 93 100 0 0 Prev. Maint. - Stop Gap $1,961 Surface Treatment - Slurry Seal 11/1/21 2027-29 31 1 PLAZA POINTE DR AVENIDA DE LA CARLOTA SOUTH POINTE DR AAC E F 895 35 35,210 95 100 0 0 Prev. Maint. - Stop Gap $2,113 Surface Treatment - Slurry Seal 11/1/21 2027-29 251 1 RIMINI SAN REMO DR END AAC E F 250 35 10,483 94 100 0 0 Prev. Maint. - Stop Gap $629 Surface Treatment - Slurry Seal 11/1/21 2027-29 262 1 SAN DONA GENOVA END AAC E F 312 35 14,257 93 100 0 0 Prev. Maint. - Stop Gap $855 Surface Treatment - Slurry Seal 11/1/21 2027-29 34 1 SAN REMO DR TERAMO SANTA VITTORIA DR. AAC E F 1,100 32 34,543 89 98 2 0 Type II Slurry Seal $18,999 Surface Treatment - Slurry Seal 11/1/21 2027-29 34 2 SAN REMO DR PESARO TERAMO AAC E F 612 32 19,837 92 100 0 0 Prev. Maint. - Stop Gap $1,190 Surface Treatment - Slurry Seal 11/1/21 2027-29 34 3 SAN REMO DR PALERMO SANTA MARIA AVE AC E F 539 32 16,095 88 100 0 0 Type II Slurry Seal $8,852 Surface Treatment - Slurry Seal 11/1/21 2027-29 34 4 SAN REMO DR PALERMO PESARO AAC E F 482 32 15,198 86 100 0 0 Type II Slurry Seal $8,359 Surface Treatment - Slurry Seal 11/1/21 2027-29 278 1 SORESINA TERAMO ADAMO AAC E F 655 35 21,921 93 100 0 0 Prev. Maint. - Stop Gap $1,315 Surface Treatment - Slurry Seal 11/1/21 2027-29 35 1 SOUTH POINTE DR PLAZA POINTE DR END AAC E F 487 40 21,196 97 100 0 0 Prev. Maint. - Stop Gap $1,272 Surface Treatment - Slurry Seal 11/1/21 2027-29 35 2 SOUTH POINTE DR PLAZA POINTE DR PERALTA RD AAC E F 871 40 33,739 95 100 0 0 Prev. Maint. - Stop Gap $2,024 Surface Treatment - Slurry Seal 11/1/21 2027-29 300 1 TARANTO VENISIA SAN REMO DR AAC E F 902 35 19,565 93 100 0 0 Prev. Maint. - Stop Gap $1,174 Surface Treatment - Slurry Seal 11/1/21 2027-29 300 2 TARANTO TREVISO VENISIA AAC E F 803 35 27,905 92 100 0 0 Prev. Maint. - Stop Gap $1,674 Surface Treatment - Slurry Seal 11/1/21 2027-29 302 1 TERAMO SAN REMO MARSALA AAC E F 747 39 27,343 92 100 0 0 Prev. Maint. - Stop Gap $1,641 Surface Treatment - Slurry Seal 11/1/21 2027-29 303 1 TERNI SORESINA END AAC E F 330 35 12,025 92 100 0 0 Prev. Maint. - Stop Gap $722 Surface Treatment - Slurry Seal 11/1/21 2027-29 38 1 TERRA DR LA CADENA DR END AAC E F 158 40 8,474 92 100 0 0 Prev. Maint. - Stop Gap $508 Surface Treatment - Slurry Seal 11/1/21 2027-29 309 1 TORINO TARANTO TORINO AAC E F 252 35 7,054 92 100 0 0 Prev. Maint. - Stop Gap $423 Surface Treatment - Slurry Seal 11/1/21 2027-29 309 2 TORINO WEST END EAST END AAC E F 298 35 20,018 93 100 0 0 Prev. Maint. - Stop Gap $1,201 Surface Treatment - Slurry Seal 11/1/21 2027-29 311 1 TREVISO NAPOLI END AAC E F 425 35 10,508 94 100 0 0 Prev. Maint. - Stop Gap $630 Surface Treatment - Slurry Seal 11/1/21 2027-29 314 1 VENISIA TARANTO END AAC E F 287 35 11,383 94 100 0 0 Prev. Maint. - Stop Gap $683 Surface Treatment - Slurry Seal 11/1/21 2027-29 39 1 VERDUGO DR LA CADENA DR EL PACIFICO DR AAC E F 587 36 23,434 92 100 0 0 Prev. Maint. - Stop Gap $1,406 Surface Treatment - Slurry Seal 11/1/21 2027-29 39 2 VERDUGO DR ALCALDE DR EL PACIFICO DR AAC E F 560 36 22,708 93 100 0 0 Prev. Maint. - Stop Gap $1,362 Surface Treatment - Slurry Seal 11/1/21 2027-29 316 1 VERONA TARANTO END AAC E F 328 35 14,216 95 100 0 0 Prev. Maint. - Stop Gap $853 Surface Treatment - Slurry Seal 11/1/21 2027-29 40 1 VISTA GRANDE DR PERALTA DR END AAC E F 443 40 19,084 91 98 2 0 Type II Slurry Seal $10,496 Surface Treatment - Slurry Seal 11/1/21 $218,495
2028-30 1 1 ALAMEDA AVE DEL MONTE ST ALISO HILLS DR AAC E C 474 38 16,388 88 100 0 0 Type II Slurry Seal $9,997 Overlay - AC Structural 7/1/11 2028-30 1 2 ALAMEDA AVE EL PRADO ST DEL MONTE ST AAC E C 730 38 27,165 84 60 19 21 Type II Slurry Seal $16,571 Overlay - AC Structural 7/1/11 2028-30 1 3 ALAMEDA AVE EL PRADO ST ELENA DR AAC E C 637 38 22,561 90 100 0 0 Type II Slurry Seal $13,762 Overlay - AC Structural 7/1/11 2028-30 1 4 ALAMEDA AVE ELENA DR MONTE ROYALE ST AAC E C 771 38 27,118 76 57 28 15 Type II Slurry Seal $16,542 Overlay - AC Structural 7/1/11 2028-30 1 5 ALAMEDA AVE LA PAZ RD MONTE ROYALE ST AAC E C 449 38 15,032 79 76 20 4 Type II Slurry Seal $9,170 Crack Sealing - AC 7/1/05 2028-30 1 5 ALAMEDA AVE LA PAZ RD MONTE ROYALE ST AAC E C 449 38 15,032 79 76 20 4 Type II Slurry Seal $9,170 Grinding (Localized) 7/1/05 2028-30 1 5 ALAMEDA AVE LA PAZ RD MONTE ROYALE ST AAC E C 449 38 15,032 79 76 20 4 Type II Slurry Seal $9,170 Overlay - AC Structural 7/1/05 2028-30 1 5 ALAMEDA AVE LA PAZ RD MONTE ROYALE ST AAC E C 449 38 15,032 79 76 20 4 Type II Slurry Seal $9,170 Patching - AC Deep 7/1/05 2028-30 44 1 ALISAL AVE SARITA DR LINDA VISTA DR AAC E C 970 33 31,319 100 0 0 0 Prev. Maint. - Stop Gap $2,192 Overlay - AC Structural 1/1/20 2028-30 44 2 ALISAL AVE LINDA VISTA DR PASEO DE VALENCIA AAC E C 120 37 4,532 100 0 0 0 Prev. Maint. - Stop Gap $317 Overlay - AC Structural 1/1/20 2028-30 5 1 ALISO HILLS DR LA CIENEGA ST SIERRA BONITA DR AAC E C 753 38 27,153 80 63 21 16 Type II Slurry Seal $16,563 Grinding (Localized) 7/1/05

Page 5 of 8 ends
Page 487 of 570 ends

City of Laguna Hills, CA
Forecast Maintenance / Rehabilitation (FMR) Report - FY 2024-2031 Sorted by Rank, FY, Name Order (A-Z)
FY Branch ID Sec ID Name From To Type Rank Zone L W Area PCI PCI Pct Climate PCI Pct Load PCI Pct Other Maint. Type Total $ Last Work Type Last Work Date 2028-30 5 1 ALISO HILLS DR LA CIENEGA ST SIERRA BONITA DR AAC E C 753 38 27,153 80 63 21 16 Type II Slurry Seal $16,563 Overlay - AC Structural 7/1/05 2028-30 5 1 ALISO HILLS DR LA CIENEGA ST SIERRA BONITA DR AAC E C 753 38 27,153 80 63 21 16 Type II Slurry Seal $16,563 Patching - AC Deep 7/1/05 2028-30 5 2 ALISO HILLS DR LA PAZ RD LUNA BONITA DR AAC E C 453 38 15,254 83 88 12 0 Type II Slurry Seal $9,305 Crack Sealing - AC 7/1/05 2028-30 5 2 ALISO HILLS DR LA PAZ RD LUNA BONITA DR AAC E C 453 38 15,254 83 88 12 0 Type II Slurry Seal $9,305 Grinding (Localized) 7/1/05 2028-30 5 2 ALISO HILLS DR LA PAZ RD LUNA BONITA DR AAC E C 453 38 15,254 83 88 12 0 Type II Slurry Seal $9,305 Overlay - AC Thin 7/1/05 2028-30 5 2 ALISO HILLS DR LA PAZ RD LUNA BONITA DR AAC E C 453 38 15,254 83 88 12 0 Type II Slurry Seal $9,305 Patching - AC Deep 7/1/05 2028-30 5 3 ALISO HILLS DR LUNA BONITA DR LA SERRA ST AAC E C 1,689 38 61,689 78 52 47 1 Type II Slurry Seal $37,630 Crack Sealing - AC 7/1/05 2028-30 5 3 ALISO HILLS DR LUNA BONITA DR LA SERRA ST AAC E C 1,689 38 61,689 78 52 47 1 Type II Slurry Seal $37,630 Grinding (Localized) 7/1/05 2028-30 5 3 ALISO HILLS DR LUNA BONITA DR LA SERRA ST AAC E C 1,689 38 61,689 78 52 47 1 Type II Slurry Seal $37,630 Overlay - AC Structural 7/1/05 2028-30 5 3 ALISO HILLS DR LUNA BONITA DR LA SERRA ST AAC E C 1,689 38 61,689 78 52 47 1 Type II Slurry Seal $37,630 Patching - AC Deep 7/1/05 2028-30 5 4 ALISO HILLS DR LA SERRA ST MENDOCINO AV AAC E C 763 38 28,071 80 90 10 0 Type II Slurry Seal $17,123 Crack Sealing - AC 7/1/05 2028-30 5 4 ALISO HILLS DR LA SERRA ST MENDOCINO AV AAC E C 763 38 28,071 80 90 10 0 Type II Slurry Seal $17,123 Grinding (Localized) 7/1/05 2028-30 5 4 ALISO HILLS DR LA SERRA ST MENDOCINO AV AAC E C 763 38 28,071 80 90 10 0 Type II Slurry Seal $17,123 Overlay - AC Structural 7/1/05 2028-30 5 4 ALISO HILLS DR LA SERRA ST MENDOCINO AV AAC E C 763 38 28,071 80 90 10 0 Type II Slurry Seal $17,123 Patching - AC Deep 7/1/05 2028-30 5 5 ALISO HILLS DR MENDOCINO AV LA CIENEGA ST AAC E C 992 38 35,696 83 85 0 15 Type II Slurry Seal $21,775 Grinding (Localized) 7/1/05 2028-30 5 5 ALISO HILLS DR MENDOCINO AV LA CIENEGA ST AAC E C 992 38 35,696 83 85 0 15 Type II Slurry Seal $21,775 Overlay - AC Structural 7/1/05 2028-30 5 5 ALISO HILLS DR MENDOCINO AV LA CIENEGA ST AAC E C 992 38 35,696 83 85 0 15 Type II Slurry Seal $21,775 Patching - AC Deep 7/1/05 2028-30 5 6 ALISO HILLS DR ALICIA PKWY LA CIENEGA ST AAC E C 713 38 23,624 82 58 42 0 Type II Slurry Seal $14,411 Grinding (Localized) 7/1/05 2028-30 5 6 ALISO HILLS DR ALICIA PKWY LA CIENEGA ST AAC E C 713 38 23,624 82 58 42 0 Type II Slurry Seal $14,411 Overlay - AC Thin 7/1/05 2028-30 5 6 ALISO HILLS DR ALICIA PKWY LA CIENEGA ST AAC E C 713 38 23,624 82 58 42 0 Type II Slurry Seal $14,411 Patching - AC Deep 7/1/05 2028-30 45 1 ALTA LOMA CT SANTA ROSA AVE EAST END AAC E C 460 37 18,714 100 0 0 0 Prev. Maint. - Stop Gap $1,310 Overlay - AC Fabric 1/1/20 2028-30 46 1 ALTA MIRA DR ALEMEDA AVE BUENA VISTA DR AAC E C 400 37 14,174 100 0 0 0 Prev. Maint. - Stop Gap $992 Overlay - AC Structural 1/1/20 2028-30 47 1 AMALIA ST YOLANDA ST CARMEL ST AC E C 210 33 6,787 95 100 0 0 Type II Slurry Seal $4,140 Surface Treatment - Slurry Seal 11/1/21 2028-30 48 1 ANACAPA ST SAN PEDRO AVE EL PRADO ST AAC E C 770 33 24,949 100 0 0 0 Prev. Maint. - Stop Gap $1,746 Overlay - AC Structural 1/1/20 2028-30 51 1 ANDREA ST LUPITA ST NORTH END AC E C 272 39 11,390 91 100 0 0 Type II Slurry Seal $6,948 Surface Treatment - Slurry Seal 11/1/21 2028-30 51 2 ANDREA ST LUPITA ST SOUTH END AC E C 269 39 11,066 90 100 0 0 Type II Slurry Seal $6,750 Surface Treatment - Slurry Seal 11/1/21 2028-30 74 1 BUENA VISTA DR LOS GATOS DR NORTH END AAC E C 1,130 38 43,072 100 0 0 0 Prev. Maint. - Stop Gap $3,015 Overlay - AC Structural 1/1/20 2028-30 77 1 CALERO AVE LA MIRADA ST EL CONEJO LN AAC E C 290 33 10,417 100 0 0 0 Prev. Maint. - Stop Gap $729 Overlay - AC Structural 1/1/20 2028-30 82 1 CARMEL ST SOUTH END NORTH END AC E C 865 35 32,519 92 100 0 0 Type II Slurry Seal $19,837 Surface Treatment - Slurry Seal 11/1/21 2028-30 98 1 CREEK DR LINDA VISTA DR SOUTH END AAC E C 780 35 27,774 100 0 0 0 Prev. Maint. - Stop Gap $1,944 Overlay - AC Fabric 1/1/20 2028-30 105 1 DEL MONTE ST ALAMEDA AVE LA CUESTA AVE AAC E C 950 37 34,363 100 0 0 0 Prev. Maint. - Stop Gap $2,405 Overlay - AC Structural 1/1/20 2028-30 113 1 EL CAPITAN LN CREEK DR LARGO DR AAC E C 880 33 30,241 85 82 0 18 Type II Slurry Seal $18,447 Overlay - AC Structural 7/1/11 2028-30 114 1 EL CONEJO LN LINDA VISTA DR CALERO AVE AAC E C 930 33 29,817 100 0 0 0 Prev. Maint. - Stop Gap $2,087 Overlay - AC Structural 1/1/20 2028-30 117 1 EL PRADO ST ALAMEDA AVE SAN PEDRO AVE AAC E C 810 37 29,382 100 0 0 0 Prev. Maint. - Stop Gap $2,057 Overlay - AC Structural 1/1/20 2028-30 118 1 EL SEGUNDO ST ALISO HILLS DR NORTH END AAC E C 570 36 21,362 100 0 0 0 Prev. Maint. - Stop Gap $1,495 Overlay - AC Structural 1/1/20 2028-30 119 1 ELENA DR LOS GATOS DR ALAMEDA AVE AAC E C 535 37 21,634 100 0 0 0 Prev. Maint. - Stop Gap $1,514 Overlay - AC Structural 1/1/20 2028-30 122 1 ENCANTO CT LUNA BONITA DR SOUTH END AC E C 280 39 11,487 64 52 48 0 Type II Slurry Seal $7,007 New Construction - Initial 1/1/80 2028-30 124 1 ERNESTINE CT LINDA FLORA ST NORTH END AAC E C 475 37 17,443 100 0 0 0 Prev. Maint. - Stop Gap $1,221 Overlay - AC Structural 1/1/20 2028-30 126 1 EVA ST LUPITA ST YOLANDA ST AC E C 950 33 32,987 95 100 0 0 Type II Slurry Seal $20,122 Surface Treatment - Slurry Seal 11/1/21 2028-30 142 1 GORDON RD MOULTON PKWY IMPERIAL DR AAC E C 450 37 18,217 100 0 0 0 Prev. Maint. - Stop Gap $1,275 Overlay - AC Structural 8/31/21 2028-30 163 1 LA CIENEGA ST RIO GRANDE AVE SIERRA BONITA DR AAC E C 1,160 37 39,372 100 0 0 0 Prev. Maint. - Stop Gap $2,756 Overlay - AC Structural 1/1/20 2028-30 163 2 LA CIENEGA ST LA CIENEGA ST ALISO HILLS DR AAC E C 130 37 4,993 100 0 0 0 Prev. Maint. - Stop Gap $350 Overlay - AC Structural 1/1/20 2028-30 164 1 LA CUESTA AVE TERRA BELLA AVE SAUSALITO ST AAC E C 1,350 33 45,043 100 0 0 0 Prev. Maint. - Stop Gap $3,153 Overlay - AC Fabric 1/1/20 2028-30 165 1 LA HABRA CT SARITA DR EAST END AAC E C 330 33 12,657 100 0 0 0 Prev. Maint. - Stop Gap $886 Overlay - AC Fabric 1/1/20 2028-30 166 1 LA MIRADA ST ALISAL LN LINDA VISTA DR AAC E C 1,375 33 44,926 100 0 0 0 Prev. Maint. - Stop Gap $3,145 Overlay - AC Structural 1/1/20 2028-30 167 1 LA SERRA ST ALISO HILLS DR NORTH END AC E C 715 38 26,496 67 44 56 0 Type II Slurry Seal $16,163 New Construction - Initial 1/1/80 2028-30 169 1 LARGO DR WEST END LINDA VISTA DR AAC E C 1,430 35 50,183 84 51 49 0 Type II Slurry Seal $30,612 Overlay - AC Structural 7/1/11 2028-30 170 1 LAS ALTURAS AVE MANDEVILLE DR MONTE ROYALE ST AAC E C 1,025 37 33,124 73 34 62 4 Type II Slurry Seal $20,206 Overlay - AC Structural 7/1/11 2028-30 171 1 LAS ALTURAS CT LAS ALTURAS AVE EAST END AAC E C 170 43 7,714 80 88 10 2 Type II Slurry Seal $4,706 Overlay - AC Structural 7/1/11 2028-30 174 1 LINDA FLORA ST EAST END EL SEGUNDO ST AAC E C 890 35 32,775 100 0 0 0 Prev. Maint. - Stop Gap $2,294 Overlay - AC Structural 1/1/20 2028-30 175 1 LINDA VISTA DR LARGO DR ALISAL AVE AAC E C 1,037 37 36,215 81 88 12 0 Type II Slurry Seal $22,091 Overlay - AC Structural 7/1/11 2028-30 175 2 LINDA VISTA DR ALISAL AVE SARITA DR AAC E C 928 37 33,659 79 91 0 9 Type II Slurry Seal $20,532 Overlay - AC Structural 7/1/11 2028-30 180 1 LOS ALAMITOS AVE MONTE ROYALE ST MANDEVILLE DR AAC E C 1,215 37 44,918 100 0 0 0 Prev. Maint. - Stop Gap $3,144 Overlay - AC Structural 1/1/20 2028-30 181 1 LOS CERROS ST LA CIENEGA ST SOUTH END AAC E C 230 33 10,124 100 0 0 0 Prev. Maint. - Stop Gap $709 Overlay - AC Fabric 1/1/20 2028-30 182 1 LOS GATOS DR BUENA VISTA DR WEST END AAC E C 490 39 19,961 100 0 0 0 Prev. Maint. - Stop Gap $1,397 Overlay - AC Structural 1/1/20 2028-30 185 1 LOUISA ST MOULTON PKWY WEST END AC E C 1,225 33 40,779 91 100 0 0 Type II Slurry Seal $24,875 Surface Treatment - Slurry Seal 11/1/21 2028-30 186 1 LUNA BONITA DR LA SERRA ST ENCANTO CT AAC E C 662 33 21,636 84 97 0 3 Type II Slurry Seal $13,198 Overlay - AC Structural 7/1/11 2028-30 186 2 LUNA BONITA DR ENCANTO CT ALISO HILLS DR AAC E C 1,549 33 51,367 76 80 16 4 Type II Slurry Seal $31,334 Overlay - AC Structural 7/1/11 2028-30 187 1 LUPITA ST LOUISA ST EVA ST AC E C 600 33 19,313 90 78 22 0 Type II Slurry Seal $11,781 Surface Treatment - Slurry Seal 11/1/21 2028-30 192 1 MANDEVILLE DR EAST END MOULTON PKWY AAC E C 1,685 38 61,758 80 76 8 16 Type II Slurry Seal $37,672 Overlay - AC Structural 7/1/11 2028-30 194 1 MARIN CT EL CAPITAN LN SOUTH END AAC E C 205 33 8,720 100 0 0 0 Prev. Maint. - Stop Gap $610 Overlay - AC Fabric 1/1/20 2028-30 200 1 MENDOCINO AVE ALISO HILLS DR MENDOCINO CT AAC E C 130 36 4,250 100 0 0 0 Prev. Maint. - Stop Gap $298 Overlay - AC Structural 1/1/20 2028-30 201 1 MENDOCINO CT WEST END EAST OF MENDOCINO AVE AAC E C 1,080 37 40,736 100 0 0 0 Prev. Maint. - Stop Gap $2,852 Overlay - AC Structural 1/1/20 2028-30 208 1 MONTE ROYALE ST ALAMEDA AVE LOS ALAMITOS AVE AAC E C 1,225 37 45,287 79 86 0 14 Type II Slurry Seal $27,625 Overlay - AC Structural 7/1/11 2028-30 211 1 MORRO CT TERRA BELLA AVE WEST END AAC E C 230 33 9,463 100 0 0 0 Prev. Maint. - Stop Gap $662 Overlay - AC Fabric 1/1/20 2028-30 215 1 NATAMA CT TERRA BELLA AVE WEST END AAC E C 210 33 8,952 100 0 0 0 Prev. Maint. - Stop Gap $627 Overlay - AC Fabric 1/1/20 2028-30 228 1 PATRICIA ST LUPITA ST EAST END AC E C 420 37 15,727 85 100 0 0 Type II Slurry Seal $9,593 Surface Treatment - Slurry Seal 11/1/21 2028-30 241 1 PONCE CT LINDA VISTA DR SOUTH END AAC E C 205 33 9,101 100 0 0 0 Prev. Maint. - Stop Gap $637 Overlay - AC Structural 1/1/20 2028-30 244 1 RAMONA ST YOLANDA ST ALICIA PKWY AC E C 475 31 15,789 92 100 0 0 Type II Slurry Seal $9,631 Surface Treatment - Slurry Seal 11/1/21 2028-30 252 1 RIO GRANDE AVE TALEGA AVE LA CIENEGA ST AAC E C 880 37 36,441 100 0 0 0 Prev. Maint. - Stop Gap $2,551 Overlay - AC Structural 1/1/20 2028-30 258 1 ROSA ST LUPITA ST NORTH END AC E C 560 36 19,984 89 100 0 0 Type II Slurry Seal $12,190 Surface Treatment - Slurry Seal 11/1/21 2028-30 263 1 SAN PEDRO AVE ANACAPA ST TALEGA AVE AAC E C 625 33 24,255 100 0 0 0 Prev. Maint. - Stop Gap $1,698 Overlay - AC Structural 1/1/20

Page 6 of 8 ends
Page 488 of 570 ends

City of Laguna Hills, CA
Forecast Maintenance / Rehabilitation (FMR) Report - FY 2024-2031 Sorted by Rank, FY, Name Order (A-Z)
FY Branch ID Sec ID Name From To Type Rank Zone L W Area PCI PCI Pct Climate PCI Pct Load PCI Pct Other Maint. Type Total $ Last Work Type Last Work Date 2028-30 265 1 SANDIA CT TERRA BELLA AVE NORTH END AAC E C 425 37 18,023 100 0 0 0 Prev. Maint. - Stop Gap $1,262 Overlay - AC Fabric 1/1/20 2028-30 267 1 SANTA ROSA AVE MANDEVILLE DR SUNDANCE AVE AAC E C 690 37 25,787 100 0 0 0 Prev. Maint. - Stop Gap $1,805 Overlay - AC Structural 1/1/20 2028-30 270 1 SARITA DR LINDA VISTA DR LA HABRA CT AC E C 222 33 10,570 91 98 0 2 Type II Slurry Seal $6,448 New Construction - Initial 1/1/80 2028-30 270 2 SARITA DR LA HABRA CT ALISAL LN AAC E C 445 33 13,947 100 0 0 0 Prev. Maint. - Stop Gap $976 Overlay - AC Structural 1/1/20 2028-30 271 1 SAUSALITO ST ALAMEDA AVE EAST END AAC E C 1,325 35 45,077 81 91 0 9 Type II Slurry Seal $27,497 Overlay - AC Fabric 1/1/20 2028-30 275 1 SIERRA BONITA DR LA CIENEGA ST ALISO HILLS DR AAC E C 140 42 8,516 100 0 0 0 Prev. Maint. - Stop Gap $596 Overlay - AC Structural 1/1/20 2028-30 277 1 SOLANO CT ALAMEDA AVE EAST END AAC E C 245 40 10,152 100 0 0 0 Prev. Maint. - Stop Gap $711 Overlay - AC Structural 1/1/20 2028-30 293 1 SUNBURST AVE PASEO DE VALENCIA LARGO DR AAC E C 120 37 4,222 100 0 0 0 Prev. Maint. - Stop Gap $296 Overlay - AC Structural 1/1/20 2028-30 294 1 SUNDANCE AVE SANTA ROSA AVE LOS ALAMITOS AVE AAC E C 420 37 16,235 100 0 0 0 Prev. Maint. - Stop Gap $1,136 Overlay - AC Structural 1/1/20 2028-30 299 1 TALEGA AVE SAN PEDRO AVE ALAMEDA AVE AAC E C 875 37 30,496 100 0 0 0 Prev. Maint. - Stop Gap $2,135 Overlay - AC Structural 1/1/20 2028-30 304 1 TERRA BELLA AVE ALISO HILLS DR MORRO CT AAC E C 1,204 38 42,065 100 0 0 0 Prev. Maint. - Stop Gap $2,945 Overlay - AC Structural 1/1/20 2028-30 304 2 TERRA BELLA AVE MORRO CT SOUTH END AAC E C 883 38 33,426 100 0 0 0 Prev. Maint. - Stop Gap $2,340 Overlay - AC Structural 1/1/20 2028-30 306 1 TOCALOMA CT ALAMEDA AVE EAST END AAC E C 575 29 17,375 100 0 0 0 Prev. Maint. - Stop Gap $1,216 Overlay - AC Structural 1/1/20 2028-30 307 1 TOLUCA CT LINDA FLORA ST NORTH END AAC E C 410 37 15,449 100 0 0 0 Prev. Maint. - Stop Gap $1,081 Overlay - AC Structural 1/1/20 2028-30 339 1 YOLANDA ST EVA ST RAMONA ST AC E C 800 33 25,680 88 79 21 0 Type II Slurry Seal $15,665 Surface Treatment - Slurry Seal 11/1/21 2028-30 341 1 ZUMAYA CT WEST END BUENA VISTA DR AAC E C 470 37 17,010 100 0 0 0 Prev. Maint. - Stop Gap $1,191 Overlay - AC Structural 1/1/20 $1,002,858
2028-30 53 1 ASHLAND DR KENNINGTON DR WEYBURN DR AAC E E 1,175 37 43,309 100 0 0 0 Prev. Maint. - Stop Gap $3,032 Overlay - AC Structural 1/1/20 2028-30 55 1 AVENIDA AVALON VIA BALBOA SOUTH END AAC E E 210 33 8,692 100 0 0 0 Prev. Maint. - Stop Gap $608 Overlay - AC Structural 1/1/20 2028-30 6 15 AVENIDA DE LA CARLOTA LOS ALISOS BL S CNR CHRISTINA CT N CNR AAC E E 155 34 5,652 90 100 0 0 Type II Slurry Seal $3,448 Overlay - AC Structural 6/1/18 2028-30 61 1 BECKENHAM ST PASEO DE VALENCIA ACACIA LN AAC E E 1,063 36 35,267 100 0 0 0 Prev. Maint. - Stop Gap $2,469 Overlay - AC Fabric 1/1/20 2028-30 61 2 BECKENHAM ST ACACIA LN WILKES PL AAC E E 591 36 18,845 100 0 0 0 Prev. Maint. - Stop Gap $1,319 Overlay - AC Fabric 1/1/20 2028-30 79 1 CALLE CARMEL HENDON ST SOUTH END AAC E E 570 26 16,440 100 0 0 0 Prev. Maint. - Stop Gap $1,151 Overlay - AC Structural 1/1/20 2028-30 80 1 CAMBERWELL ST HON AVE HENDON ST AAC E E 1,103 37 39,161 84 64 36 0 Type II Slurry Seal $23,888 Overlay - AC Structural 7/1/11 2028-30 80 2 CAMBERWELL ST HENDON COUSTEU ST AAC E E 607 37 22,917 84 65 35 0 Type II Slurry Seal $13,979 Overlay - AC Structural 7/1/11 2028-30 83 1 CAROL LN JULIE AVE EAST END AAC E E 430 37 16,227 100 0 0 0 Prev. Maint. - Stop Gap $1,136 Overlay - AC Structural 1/1/20 2028-30 90 1 CHRISTINA CT EAST END WEST END AAC E E 1,050 36 37,048 81 92 0 8 Type II Slurry Seal $22,599 Overlay - AC Structural 6/1/18 2028-30 91 1 CLARINGTON DR WEYBURN DR KENNINGTON DR AAC E E 1,265 37 46,953 100 0 0 0 Prev. Maint. - Stop Gap $3,287 Overlay - AC Structural 1/1/20 2028-30 95 1 COSTEAU CT COSTEAU ST NORTH END AAC E E 110 49 5,199 76 54 46 0 Type II Slurry Seal $3,171 Overlay - AC Structural 7/1/11 2028-30 95 2 COSTEAU CT COSTEAU ST NORTH END AAC E E 115 48 5,694 78 100 0 0 Type II Slurry Seal $3,473 Overlay - AC Structural 7/1/11 2028-30 97 1 COSTEAU ST ALICIA PKWY BECKENHAM ST AAC E E 1,650 36 54,739 72 57 0 43 Type II Slurry Seal $33,391 Overlay - AC Structural 7/1/11 2028-30 99 1 CREEKVIEW DR WEST END CHRISTINA CT AAC E E 1,315 34 45,673 79 100 0 0 Type II Slurry Seal $27,861 Overlay - AC Structural 6/1/18 2028-30 101 1 CRESTA CT CREEKVIEW DR NORTH END AAC E E 160 33 7,657 86 100 0 0 Type II Slurry Seal $4,671 Overlay - AC Structural 6/1/18 2028-30 107 1 DERBY CIR WILKES PL WEST END AAC E E 490 37 18,044 88 54 46 0 Type II Slurry Seal $11,007 Overlay - AC Structural 7/1/11 2028-30 138 1 GEORGIA SUE DR JORIE DR EAST END AAC E E 1,365 37 49,377 77 85 8 7 Type II Slurry Seal $30,120 Overlay - AC Structural 7/1/05 2028-30 351 1 HEALTH CENTER DR PASEO DE VALENCIA CALLE DE LA LOUISA AC E E 760 20 24,915 88 100 0 0 Type II Slurry Seal $15,198 New Construction - Initial 1/1/80 2028-30 351 2 HEALTH CENTER DR CALLE DE LA LOUISA PASEO DE VALENCIA AC E E 769 20 24,057 89 59 41 0 Type II Slurry Seal $14,675 New Construction - Initial 1/1/80 2028-30 148 1 HENDON ST COSTEAU ST CAMBERWELL ST AAC E E 1,255 33 42,452 81 100 0 0 Type II Slurry Seal $25,896 Overlay - AC Structural 7/1/05 2028-30 148 2 HENDON ST CAMBERWELL ST CALLE CARMEL AAC E E 500 37 19,577 100 0 0 0 Prev. Maint. - Stop Gap $1,370 Overlay - AC Structural 1/1/20 2028-30 15 1 HON AVE ALICIA PKWY CAMBERWELL ST AAC E E 777 27 20,311 82 62 36 2 Type II Slurry Seal $12,390 Overlay - AC Structural 7/1/11 2028-30 15 2 HON AVE CAMBERWELL ST ALICIA PKWY AAC E E 829 37 22,925 80 40 60 0 Type II Slurry Seal $13,984 Overlay - AC Structural 7/1/11 2028-30 15 3 HON AVE CAMBERWELL ST GEORGIA SUE AAC E E 1,482 33 57,324 100 0 0 0 Prev. Maint. - Stop Gap $4,013 Overlay - AC Structural 1/1/20 2028-30 16 1 INDIAN HILL LN MOULTON PKWY ASH CREEK LN AAC E E 662 38 23,777 84 97 0 3 Type II Slurry Seal $14,504 Crack Sealing - AC 7/1/05 2028-30 16 1 INDIAN HILL LN MOULTON PKWY ASH CREEK LN AAC E E 662 38 23,777 84 97 0 3 Type II Slurry Seal $14,504 Grinding (Localized) 7/1/05 2028-30 16 1 INDIAN HILL LN MOULTON PKWY ASH CREEK LN AAC E E 662 38 23,777 84 97 0 3 Type II Slurry Seal $14,504 Overlay - AC Structural 7/1/05 2028-30 16 1 INDIAN HILL LN MOULTON PKWY ASH CREEK LN AAC E E 662 38 23,777 84 97 0 3 Type II Slurry Seal $14,504 Patching - AC Deep 7/1/05 2028-30 16 2 INDIAN HILL LN LAGUNA HILLS DR OWL HILL LN AAC E E 485 38 16,188 82 55 28 17 Type II Slurry Seal $9,875 Crack Sealing - AC 7/1/05 2028-30 16 2 INDIAN HILL LN LAGUNA HILLS DR OWL HILL LN AAC E E 485 38 16,188 82 55 28 17 Type II Slurry Seal $9,875 Grinding (Localized) 7/1/05 2028-30 16 2 INDIAN HILL LN LAGUNA HILLS DR OWL HILL LN AAC E E 485 38 16,188 82 55 28 17 Type II Slurry Seal $9,875 Overlay - AC Structural 7/1/05 2028-30 16 2 INDIAN HILL LN LAGUNA HILLS DR OWL HILL LN AAC E E 485 38 16,188 82 55 28 17 Type II Slurry Seal $9,875 Patching - AC Deep 7/1/05 2028-30 16 3 INDIAN HILL LN OWL HILL LN ASH CREEK LN AAC E E 909 38 33,150 73 79 0 21 Type II Slurry Seal $20,222 Crack Sealing - AC 7/1/05 2028-30 16 3 INDIAN HILL LN OWL HILL LN ASH CREEK LN AAC E E 909 38 33,150 73 79 0 21 Type II Slurry Seal $20,222 Grinding (Localized) 7/1/05 2028-30 16 3 INDIAN HILL LN OWL HILL LN ASH CREEK LN AAC E E 909 38 33,150 73 79 0 21 Type II Slurry Seal $20,222 Overlay - AC Structural 7/1/05 2028-30 16 3 INDIAN HILL LN OWL HILL LN ASH CREEK LN AAC E E 909 38 33,150 73 79 0 21 Type II Slurry Seal $20,222 Patching - AC Deep 7/1/05 2028-30 156 1 JORIE DR WEYBURN DR GEORGIA SUE AAC E E 490 37 19,881 100 0 0 0 Prev. Maint. - Stop Gap $1,392 Overlay - AC Structural 1/1/20 2028-30 157 1 JULIE AVE HON AVE SARA LN AAC E E 740 37 26,227 100 0 0 0 Prev. Maint. - Stop Gap $1,836 Overlay - AC Structural 1/1/20 2028-30 158 1 KATIE AVE JULIE AVE EAST END AAC E E 435 37 16,218 100 0 0 0 Prev. Maint. - Stop Gap $1,135 Overlay - AC Structural 1/1/20 2028-30 159 1 KENNINGTON DR PASEO DE VALENCIA CLARINGTON DR AAC E E 200 37 7,798 100 0 0 0 Prev. Maint. - Stop Gap $546 Overlay - AC Structural 1/1/20 2028-30 160 1 KIM CIR GEORGIA SUE DR SOUTH END AAC E E 450 37 16,924 100 0 0 0 Prev. Maint. - Stop Gap $1,185 Overlay - AC Structural 1/1/20 2028-30 188 1 LUTON ST CAMBERWELL ST EAST END AAC E E 380 38 14,203 100 0 0 0 Prev. Maint. - Stop Gap $994 Overlay - AC Structural 1/1/20 2028-30 225 1 PAIGE CIR GEORGIA SUE DR SOUTH END AAC E E 675 37 25,189 100 0 0 0 Prev. Maint. - Stop Gap $1,763 Overlay - AC Structural 1/1/20 2028-30 253 1 RITTEN HOUSE CIR ASHLAND DR NORTH END AAC E E 420 37 15,801 100 0 0 0 Prev. Maint. - Stop Gap $1,106 Overlay - AC Structural 1/1/20 2028-30 261 1 SALFORD ST SOUTHPORT ST COSTEAU ST AAC E E 950 33 33,748 86 57 40 3 Type II Slurry Seal $20,586 Overlay - AC Structural 7/1/11 2028-30 269 1 SARA LN PAIGE CIR EAST END AAC E E 650 38 24,235 100 0 0 0 Prev. Maint. - Stop Gap $1,696 Overlay - AC Structural 1/1/20 2028-30 272 1 SAVONA BARBERA END AAC E E 284 35 14,601 93 100 0 0 Type II Slurry Seal $8,907 Surface Treatment - Slurry Seal 11/1/21 2028-30 281 1 SOUTHAMPTON CT CREEKVIEW DR NORTH END AAC E E 75 61 4,554 76 100 0 0 Type II Slurry Seal $2,778 Overlay - AC Structural 6/1/18 2028-30 282 1 SOUTHPORT CT SOUTHPORT ST NORTH END AAC E E 140 45 6,625 91 94 0 6 Type II Slurry Seal $4,041 Overlay - AC Structural 7/1/11 2028-30 283 1 SOUTHPORT ST WOOLWICH ST EAST END AAC E E 1,570 34 53,832 79 71 28 1 Type II Slurry Seal $32,838 Overlay - AC Structural 7/1/11 2028-30 291 1 STOCKPORT ST WILKES PL FIRE GATE AAC E E 635 36 22,465 100 0 0 0 Prev. Maint. - Stop Gap $1,573 Overlay - AC Fabric 1/1/20 2028-30 291 2 STOCKPORT ST PASEO DE VALENCIA FIRE GATE AAC E E 570 35 19,251 100 0 0 0 Prev. Maint. - Stop Gap $1,348 Overlay - AC Fabric 1/1/20 2028-30 296 1 SUNSET PL (E & W LOOP) BECKENHAM ST SUNSET PL AAC E E 172 34 4,964 100 0 0 0 Prev. Maint. - Stop Gap $347 Overlay - AC Structural 1/1/20 2028-30 296 2 SUNSET PL (E & W LOOP) SUNSET PL SUNSET PL WEST AAC E E 768 34 26,414 100 0 0 0 Prev. Maint. - Stop Gap $1,849 Overlay - AC Structural 1/1/20

Page 7 of 8 ends
Page 489 of 570 ends

City of Laguna Hills, CA
Forecast Maintenance / Rehabilitation (FMR) Report - FY 2024-2031 Sorted by Rank, FY, Name Order (A-Z)
FY Branch ID Sec ID Name From To Type Rank Zone L W Area PCI PCI Pct Climate PCI Pct Load PCI Pct Other Maint. Type Total $ Last Work Type Last Work Date 2028-30 296 3 SUNSET PL (E & W LOOP) SUNSET PL SUNSET PL EAST AAC E E 853 34 30,690 100 0 0 0 Prev. Maint. - Stop Gap $2,148 Overlay - AC Structural 1/1/20 2028-30 318 1 VIA BALBOA CALLE CARMEL END AAC E E 300 33 11,112 100 0 0 0 Prev. Maint. - Stop Gap $778 Overlay - AC Structural 1/1/20 2028-30 319 1 VIA LOMAS MOULTON PKWY ALICIA PKWY AC E E 2,600 37 95,841 67 49 51 0 Type II Slurry Seal $58,463 New Construction - Initial 1/1/80 2028-30 327 1 WEYBURN DR ASHLAND DR EAST END AAC E E 770 37 27,632 100 0 0 0 Prev. Maint. - Stop Gap $1,934 Overlay - AC Structural 1/1/20 2028-30 331 1 WILKES PL ALICIA PKWY NW to FIRE GATE AAC E E 1,560 36 56,464 100 0 0 0 Prev. Maint. - Stop Gap $3,952 Overlay - AC Fabric 1/1/20 2028-30 336 1 WOODCREEK DR SW to CREEKVIEW DR LOS ALISOS BLVD AAC E E 245 33 8,798 85 85 15 0 Type II Slurry Seal $5,367 Overlay - AC Structural 6/1/18 2028-30 337 1 WOOLWICH CT WOOLWICH ST WEST END AAC E E 150 45 6,916 83 100 0 0 Type II Slurry Seal $4,219 Overlay - AC Structural 7/1/11 2028-30 338 1 WOOLWICH ST COSTEAU ST WOOLWICH CT AAC E E 445 33 14,821 82 100 0 0 Type II Slurry Seal $9,041 Overlay - AC Structural 7/1/11 2028-30 338 2 WOOLWICH ST WOOLWICH CT WILKES PL AAC E E 1,030 32 33,087 92 100 0 0 Type II Slurry Seal $20,183 Overlay - AC Structural 7/1/11 2028-30 350 1 YORK CIR WILKES PL WEST END AAC E E 605 33 21,669 82 47 51 2 Type II Slurry Seal $13,218 Overlay - AC Structural 7/1/11 $661,759

Page 8 of 8 ends
Page 490 of 570 ends

City of Laguna Hills, CA Page 13
2024 Citywide Pavement Management Plan – OCTA Submittal Final Report – June 30, 2024
XII. APPENDIX B – COMPLETE STREET LISTING CURRENT CONDITIONS

Page 491 of 570 ends

City of Laguna Hills, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, Name Order (A-Z)
Branch ID Sec ID Name From To Type Rank Zone L W Area PCI PCI Pct Climate PCI Pct Load PCI Pct Other Insp. Date Work Type Work Date Arterials / Collectors (MPAH)
4 1 ALICIA PKWY ALISO HILLS DR MOULTON PKWY AAC B C 1,354 42 67,438 71 49 51 0 12/17/23 Overlay - AC Structural 7/10/17 4 10 ALICIA PKWY W. CITY LIMITS LAGUNA CT AAC B C 850 42 35,560 94 100 0 0 12/17/23 Overlay - AC Structural 7/10/17 4 11 ALICIA PKWY ALISO HILLS DR VIA LOMAS AAC B E 832 42 36,761 73 38 62 0 12/20/23 Surface Course - AC 7/1/04 4 12 ALICIA PKWY PASEO DE VALENCIA VIA LOMAS AAC B E 1,700 42 75,946 68 30 70 0 12/17/23 Surface Course - AC 7/1/04 4 13 ALICIA PKWY PASEO DE VALENCIA WILKES PL AAC B E 1,728 42 74,291 70 49 51 0 12/17/23 Surface Course - AC 7/1/04 4 14 ALICIA PKWY HON AVE COSTEAU ST AAC B E 911 42 43,886 59 50 50 0 12/17/23 Surface Course - AC 7/1/04 4 15 ALICIA PKWY COSTEAU ST WILKES PL AAC B E 1,714 42 73,727 65 36 64 0 12/17/23 Surface Course - AC 7/1/04 4 16 ALICIA PKWY HON AVE I-5 AAC B E 848 48 40,869 94 81 0 19 12/17/23 Overlay - AC Structural 7/1/04 4 17 ALICIA PKWY LAGUNA CT W. CITY LIMITS AAC B C 850 42 37,155 95 100 0 0 12/20/23 Overlay - AC Structural 7/10/17 4 18 ALICIA PKWY LAGUNA CT MOULTON PKWY AAC B C 496 42 28,642 78 100 0 0 12/20/23 Overlay - AC Structural 7/10/17 4 2 ALICIA PKWY MOULTON PKWY LAGUNA CT AAC B C 496 42 18,492 81 100 0 0 12/20/23 Overlay - AC Structural 7/10/17 4 3 ALICIA PKWY COSTEAU ST HON AVE AAC B E 925 42 44,897 72 49 51 0 12/17/23 Surface Course - AC 7/1/04 4 4 ALICIA PKWY VIA LOMAS PASEO DE VALENCIA AAC B E 1,720 42 78,369 78 54 32 14 12/20/23 Surface Course - AC 7/1/04 4 5 ALICIA PKWY VIA LOMAS ALISO HILLS DR (N) AAC B E 843 42 37,591 70 27 73 0 12/17/23 Surface Course - AC 7/1/04 4 6 ALICIA PKWY WILKES PL COSTEAU ST AAC B E 1,744 42 73,253 75 35 59 6 12/17/23 Surface Course - AC 7/1/04 4 7 ALICIA PKWY WILKES PL PASEO DE VALENCIA AAC B E 1,722 42 75,786 71 50 48 2 12/17/23 Surface Course - AC 7/1/04 4 8 ALICIA PKWY I-5 HON AVE AAC B E 793 42 39,807 93 100 0 0 12/17/23 Overlay - AC Structural 7/1/16 4 9 ALICIA PKWY MOULTON PKWY ALISO HILLS DR AAC B C 1,362 42 60,819 78 100 0 0 12/20/23 Overlay - AC Structural 7/10/17 6 1 AVENIDA DE LA CARLOTA EL TORO RD PVMT CHNGE 650' E/ OAKBROOK VILLAGE AAC B E 3,365 30 84,199 66 55 32 13 1/3/24 Surface Course - AC 7/1/01 6 10 AVENIDA DE LA CARLOTA PVMT CHNGE 650' E/ OAKBROOK VILLAGE EL TORO RD AAC B E 3,365 30 97,583 73 58 34 8 1/3/24 Surface Course - AC 7/1/01 6 11 AVENIDA DE LA CARLOTA RIDGE ROUTE DR COMMERCE CENTER AAC B F 792 29 23,202 62 65 26 9 12/29/23 Surface Course - AC 7/1/04 6 12 AVENIDA DE LA CARLOTA PASEO DE VALENCIA RIDGE ROUTE DR AAC B F 3,049 38 87,210 52 53 40 7 12/29/23 Surface Course - AC 7/1/04 6 13 AVENIDA DE LA CARLOTA COMMERCE CENTER PLAZA POINTE DR AAC B F 2,453 29 73,670 65 80 15 5 12/20/23 Surface Course - AC 7/1/04 6 14 AVENIDA DE LA CARLOTA PLAZA POINTE DR LAKE FOREST DR AAC B F 585 60 19,070 61 66 29 5 12/28/23 Surface Course - AC 7/1/04 6 2 AVENIDA DE LA CARLOTA RIDGE ROUTE DR PASEO DE VALENCIA AAC B F 3,051 38 88,207 57 68 23 9 12/28/23 Surface Course - AC 7/1/04 6 3 AVENIDA DE LA CARLOTA LAKE FOREST DR PLAZA POINTE DR AAC B F 689 30 17,519 55 48 37 15 12/28/23 Surface Course - AC 7/1/04 6 4 AVENIDA DE LA CARLOTA COMMERCE CENTER RIDGE ROUTE DR AAC B F 794 30 21,860 67 67 5 28 12/28/23 Surface Course - AC 7/1/04 6 5 AVENIDA DE LA CARLOTA PLAZA POINTE DR COMMERCE CENTER AAC B F 2,408 30 66,411 64 78 16 6 12/20/23 Surface Course - AC 7/1/04 6 6 AVENIDA DE LA CARLOTA PVMT CHNGE 650' E/ OAKBROOK VILLAGE LOS ALISOS BLVD AAC B F 505 40 41,675 77 58 25 17 12/29/23 Surface Course - AC 7/1/01 6 7 AVENIDA DE LA CARLOTA PASEO DE VALENCIA EL TORO RD AAC B F 656 40 38,693 68 63 37 0 12/28/23 Overlay - AC Structural 5/29/12 6 8 AVENIDA DE LA CARLOTA EL TORO RD PASEO DE VALENCIA AAC B F 642 40 21,371 73 41 47 12 12/28/23 Overlay - AC Structural 5/29/12 6 9 AVENIDA DE LA CARLOTA LOS ALISOS BLVD PVMT CHNGE 650' E/ OAKBROOK VILLAGE AAC B E 505 40 44,128 73 100 0 0 12/29/23 Surface Course - AC 7/1/01 8 1 CABOT RD EL PASEO PASEO DE VALENCIA AAC B B 2,808 40 86,504 84 82 17 1 12/17/23 Overlay - AC Structural 1/1/09 8 10 CABOT RD EL PASEO HITCHING RAIL RD AAC B B 557 40 19,320 82 99 0 1 12/28/23 Overlay - AC Structural 1/1/09 8 11 CABOT RD RAPID FALLS RD (N) N. CITY LIMITS AC B A 163 40 4,570 81 100 0 0 12/28/23 New Construction - Initial 1/1/90 8 12 CABOT RD PASEO DE VALENCIA LA PAZ RD AAC B D 2,604 32 79,192 76 49 51 0 12/6/23 Overlay - AC Structural 1/1/09 8 13 CABOT RD N. CITY LIMITS RAPID FALLS RD AAC B A 174 40 6,089 65 99 0 1 12/28/23 Overlay - AC Structural 7/10/17 8 14 CABOT RD RAPID FALLS RD S. CITY LIMITS AAC B A 812 40 35,932 86 82 15 3 12/20/23 Overlay - AC Structural 7/10/17 8 2 CABOT RD S. CITY LIMITS (N) RAPID FALLS DR AAC B A 787 40 39,494 84 85 14 1 12/20/23 Overlay - AC Structural 7/10/17 8 3 CABOT RD OSO PKWY S. CITY LIMITS AAC B B 830 40 27,104 81 81 13 6 12/20/23 Overlay - AC Structural 7/10/17 8 4 CABOT RD PASEO DE VALENCIA EL PASEO AAC B B 2,803 40 87,603 79 71 21 8 12/7/23 Overlay - AC Structural 1/1/09 8 5 CABOT RD OSO PKWY HITCHING RAIL RD AAC B B 294 40 6,823 77 83 17 0 12/28/23 Overlay - AC Structural 1/1/09 8 6 CABOT RD HITCHING RAIL RD EL PASEO AAC B B 560 40 17,749 80 100 0 0 12/28/23 Overlay - AC Structural 1/1/09 8 7 CABOT RD LA PAZ RD PASEO DE VALENCIA AAC B D 2,640 32 76,674 85 68 11 21 12/6/23 Overlay - AC Structural 1/1/09 8 8 CABOT RD S. CITY LIMITS OSO PKWY AAC B B 854 40 39,378 83 66 0 34 12/28/23 Overlay - AC Structural 7/10/17 8 9 CABOT RD HITCHING RAIL RD OSO PKWY AAC B B 294 40 14,472 84 96 0 4 12/28/23 Overlay - AC Structural 1/1/09 13 1 EL TORO RD PASEO DE VALENCIA AVENIDA DE LA CARLOTA AAC B F 1,498 36 68,551 95 100 0 0 12/7/23 Overlay - AC Structural 7/1/07 13 2 EL TORO RD I-5 AVENIDA DE LA CARLOTA AAC B F 555 54 26,647 95 100 0 0 12/29/23 Surface Course - AC 7/1/01 13 3 EL TORO RD AVENIDA DE LA CARLOTA I-5 AAC B F 570 63 29,770 94 92 0 8 12/29/23 Surface Course - AC 7/1/01 13 4 EL TORO RD AVENIDA DE LA CARLOTA PASEO DE VALENCIA AAC B F 1,412 36 66,012 93 100 0 0 12/7/23 Overlay - AC Structural 7/1/07 14 2 GREENFIELD DR SR 73 SB ON/OFF RAMPS SR 73 NB ON/OFF RAMPS AC B A 379 41 15,238 81 79 21 0 12/6/23 Surface Treatment - Slurry Seal 7/1/03 14 3 GREENFIELD DR SR 73 NB ON/OFF RAMPS SR 73 SB ON/OFF RAMPS AC B A 387 41 16,696 81 99 0 1 12/6/23 Surface Treatment - Slurry Seal 7/1/03 18 1 LA PAZ RD MOULTON PKWY ALAMEDA AVE AAC B C 2,228 40 86,293 69 68 25 7 12/13/23 Overlay - AC Structural 7/1/08 18 10 LA PAZ RD ALAMEDA AVE GALLUP CIR AAC B C 3,188 40 125,057 70 78 11 11 12/7/23 Overlay - AC Structural 7/1/08 18 11 LA PAZ RD ALISO HILLS DR GALLUP CIR AAC B C 930 40 36,465 65 83 13 4 12/13/23 Overlay - AC Structural 7/1/08 18 12 LA PAZ RD ALAMEDA AVE MOULTON PKWY AAC B C 2,180 40 95,681 69 94 5 1 12/13/23 Overlay - AC Structural 7/1/08 18 13 LA PAZ RD MOULTON PKWY W. CITY LIMITS AAC B C 840 50 57,142 63 50 48 2 12/20/23 Overlay - AC Structural 7/1/08 18 14 LA PAZ RD PASEO DE VALENCIA ALISO HILLS DR AAC B C 2,068 40 80,657 61 62 29 9 12/6/23 Overlay - AC Structural 7/1/08 18 15 LA PAZ RD MC INTYRE ST CHAMPLAIN RD AAC B D 1,015 30 33,323 59 38 58 4 12/17/23 Overlay - AC Structural 7/1/08 18 16 LA PAZ RD I-5 CABOT RD AAC B D 444 31 18,733 83 100 0 0 12/29/23 Surface Course - AC 7/1/00 18 17 LA PAZ RD CABOT RD MC INTYRE ST AAC B D 836 30 30,149 56 21 74 5 12/17/23 Overlay - AC Structural 7/1/08

Page 1 of 11 ends
Page 492 of 570 ends

City of Laguna Hills, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, Name Order (A-Z)
Branch ID Sec ID Name From To Type Rank Zone L W Area PCI PCI Pct Climate PCI Pct Load PCI Pct Other Insp. Date Work Type Work Date 18 18 LA PAZ RD CHAMPLAIN RD PASEO DE VALENCIA AAC B D 962 30 30,684 66 46 31 23 12/17/23 Overlay - AC Structural 7/1/08 18 2 LA PAZ RD W. CITY LIMITS MOULTON PKWY AAC B C 809 50 61,186 68 50 44 6 12/20/23 Overlay - AC Structural 7/1/08 18 3 LA PAZ RD ALISO HILLS DR PASEO DE VALENCIA AAC B C 2,062 40 82,478 69 83 12 5 12/13/23 Overlay - AC Structural 7/1/08 18 4 LA PAZ RD CHAMPLAIN RD MC INTYRE ST AAC B D 979 30 32,034 71 90 0 10 12/7/23 Overlay - AC Structural 7/1/08 18 5 LA PAZ RD CABOT RD I-5 AAC B D 458 31 15,462 83 77 12 11 12/29/23 Surface Course - AC 7/1/00 18 6 LA PAZ RD MC INTYRE ST CABOT RD AAC B D 877 30 29,067 73 65 35 0 12/17/23 Overlay - AC Structural 7/1/08 18 7 LA PAZ RD PASEO DE VALENCIA CHAMPLAIN RD AAC B D 944 30 29,282 70 69 20 11 12/17/23 Overlay - AC Structural 7/1/08 18 8 LA PAZ RD GALLUP CIR ALAMEDA AVE AAC B C 3,234 40 129,940 66 67 29 4 12/13/23 Overlay - AC Structural 7/1/08 18 9 LA PAZ RD GALLUP CIR ALISO HILLS DR AAC B C 910 40 35,620 74 90 10 0 12/13/23 Overlay - AC Structural 7/1/08 19 1 LAGUNA HILLS DR INDIAN HILL LN PASEO DE VALENCIA AAC B E 2,661 33 88,427 84 70 11 19 12/7/23 Overlay - AC Structural 6/1/10 19 3 LAGUNA HILLS DR MOULTON PKWY EAST END OF BRIDGE AAC B E 414 33 14,757 74 45 25 30 12/7/23 Overlay - AC Structural 6/1/10 19 4 LAGUNA HILLS DR EAST END OF BRIDGE INDIAN HILL LN AAC B E 639 33 23,259 76 90 0 10 12/6/23 Overlay - AC Structural 6/1/10 19 6 LAGUNA HILLS DR PASEO DE VALENCIA INDIAN HILL LN AAC B E 2,645 33 86,964 84 87 13 0 12/13/23 Overlay - AC Structural 6/1/10 19 7 LAGUNA HILLS DR WEST END OF BRIDGE MOULTON PKWY AAC B E 465 33 20,690 87 86 14 0 12/20/23 Overlay - AC Structural 6/1/10 19 8 LAGUNA HILLS DR INDIAN HILL LN EAST END OF BRIDGE AAC B E 613 33 20,968 78 83 9 8 12/6/23 Overlay - AC Structural 6/1/10 20 1 LAKE FOREST DR W CITY LIMITS SANTA VITTORIA DR AAC B F 417 42 20,767 70 100 0 0 12/7/23 Surface Course - AC 7/1/00 20 10 LAKE FOREST DR AVENIDA DE LA CARLOTA E. CITY LIMITS AAC B F 888 59 41,693 95 100 0 0 12/20/23 Overlay - AC Structural 7/1/16 20 11 LAKE FOREST DR SANTA VITTORIA DR MILL CREEK DR AAC B F 1,603 43 69,774 77 100 0 0 12/7/23 Surface Course - AC 7/1/00 20 12 LAKE FOREST DR TRITON WY MILL CREEK DR AAC B F 589 38 29,786 72 99 0 1 12/7/23 Surface Course - AC 7/1/00 20 13 LAKE FOREST DR MOULTON PKWY TRITON WY AAC B F 843 48 38,443 71 99 0 1 12/7/23 Surface Course - AC 7/1/00 20 14 LAKE FOREST DR MOULTON PKWY DEL LAGO DR AAC B F 954 46 50,064 72 99 0 1 12/20/23 Surface Course - AC 7/1/04 20 2 LAKE FOREST DR AVENIDA DE LA CARLOTA DEL LAGO DR AAC B F 914 45 56,517 72 43 57 0 12/28/23 Surface Course - AC 7/1/04 20 3 LAKE FOREST DR E. CITY LIMITS AVENIDA DE LA CARLOTA AAC B F 818 59 51,899 95 100 0 0 12/20/23 Overlay - AC Structural 7/1/16 20 4 LAKE FOREST DR MILL CREEK DR SANTA VITTORIA DR AAC B F 1,603 44 69,474 75 100 0 0 12/7/23 Surface Course - AC 7/1/00 20 5 LAKE FOREST DR MILL CREEK DR TRITON WY AAC B F 585 44 23,636 78 100 0 0 12/7/23 Surface Course - AC 7/1/00 20 6 LAKE FOREST DR TRITON WY MOULTON PKWY AAC B F 847 40 43,479 76 70 30 0 12/7/23 Surface Course - AC 7/1/00 20 7 LAKE FOREST DR DEL LAGO DR MOULTON PKWY AAC B F 949 44 54,524 74 98 0 2 12/20/23 Surface Course - AC 7/1/04 20 8 LAKE FOREST DR SANTA VITTORIA DR W CITY LIMITS AAC B F 431 51 18,474 86 85 15 0 12/7/23 Surface Course - AC 7/1/00 20 9 LAKE FOREST DR DEL LAGO DR AVENIDA DE LA CARLOTA AAC B F 918 50 44,074 72 100 0 0 12/28/23 Surface Course - AC 7/1/04 21 1 LOS ALISOS BLVD PASEO DE VALENCIA AVENIDA DE LA CARLOTA AAC B E 1,457 38 68,991 84 100 0 0 12/13/23 Overlay - AC Structural 7/10/17 21 2 LOS ALISOS BLVD AVENIDA DE LA CARLOTA I-5 OVERPASS AAC B E 757 28 27,480 87 100 0 0 12/13/23 Overlay - AC Structural 7/10/17 21 3 LOS ALISOS BLVD I-5 OVERPASS AVENIDA DE LA CARLOTA AAC B E 699 28 27,034 88 100 0 0 12/13/23 Overlay - AC Structural 7/10/17 21 4 LOS ALISOS BLVD AVENIDA DE LA CARLOTA PASEO DE VALENCIA AAC B E 1,482 40 62,089 85 97 0 3 12/13/23 Overlay - AC Structural 7/10/17 23 1 MOULTON PKWY INDIAN CIRCLE LN W. CITY LIMITS AAC B E 674 50 25,585 76 91 9 0 12/20/23 Overlay - AC Structural 4/1/10 23 10 MOULTON PKWY NORTH END OF BRIDGE LAGUNA HILLS DR AAC B E 721 42 37,272 69 99 0 1 12/20/23 Overlay - AC Structural 4/1/10 23 12 MOULTON PKWY EL PACIFICO DR LAKE FOREST DR AAC B F 1,570 50 73,673 74 82 18 0 12/17/23 Overlay - AC Structural 7/1/06 23 13 MOULTON PKWY SANTA MARIA AVE RIDGE ROUTE DR AAC B F 1,357 48 66,799 76 100 0 0 12/20/23 Overlay - AC Structural 7/1/11 23 14 MOULTON PKWY SR 73 NELLIE GAIL RD AAC B A 335 54 28,004 80 88 0 12 12/28/23 Surface Course - AC 7/1/99 23 15 MOULTON PKWY NELLIE GAIL RD OSO PKWY AAC B A 963 48 43,195 80 79 0 21 12/20/23 Surface Course - AC 7/1/99 23 16 MOULTON PKWY OSO PKWY LA PAZ RD AAC B B 1,384 36 61,005 60 56 44 0 12/28/23 Surface Course - AC 7/1/99 23 18 MOULTON PKWY EL PACIFICO DR RIDGE ROUTE DR AAC B F 1,539 50 70,352 74 89 0 11 12/20/23 Overlay - AC Structural 7/1/11 23 19 MOULTON PKWY LAKE FOREST DR EL PACIFICO DR AAC B F 1,559 50 69,299 78 91 6 3 12/20/23 Overlay - AC Structural 7/1/06 23 2 MOULTON PKWY ALISO CREEK BRIDGE INDIAN HILL LN AAC B E 681 42 30,942 67 88 0 12 12/13/23 Overlay - AC Structural 4/1/10 23 20 MOULTON PKWY LA PAZ RD MANDEVILLE DR AAC B C 1,598 48 67,390 72 68 21 11 12/20/23 Surface Course - AC 7/1/99 23 21 MOULTON PKWY VIA LOMAS ALICIA PKWY AAC B C 795 49 41,312 73 61 39 0 12/17/23 Surface Course - AC 7/1/99 23 22 MOULTON PKWY ALICIA PKWY MANDEVILLE DR AAC B C 1,566 48 66,270 65 63 30 7 12/17/23 Surface Course - AC 7/1/99 23 23 MOULTON PKWY NELLIE GAIL RD S. CITY LIMITS AAC B A 220 48 22,552 81 87 0 13 12/28/23 Surface Course - AC 7/1/99 23 24 MOULTON PKWY OSO PKWY NELLIE GAIL RD AAC B A 908 52 45,483 77 80 10 10 12/20/23 Surface Course - AC 7/1/99 23 25 MOULTON PKWY LA PAZ RD OSO PKWY AAC B B 1,391 52 62,488 69 44 47 9 12/20/23 Surface Course - AC 7/1/99 23 26 MOULTON PKWY INDIAN HILL LN SOUTH END OF BRIDGE AAC B E 857 40 34,170 65 76 18 6 12/13/23 Overlay - AC Structural 4/1/10 23 27 MOULTON PKWY INDIAN HILL LN VIA LOMAS AAC B E 1,010 41 54,610 63 74 21 5 12/17/23 Overlay - AC Structural 4/1/10 23 28 MOULTON PKWY LAGUNA HILLS DR NORTH END OF BRIDGE AAC B E 611 33 36,589 65 92 8 0 12/20/23 Overlay - AC Structural 4/1/10 23 29 MOULTON PKWY W. CITY LIMITS INDIAN CIRCLE LN AAC B E 585 38 33,769 80 100 0 0 12/20/23 Overlay - AC Structural 4/1/10 23 3 MOULTON PKWY LAGUNA HILLS DR INDIAN CIRCLE LN AAC B E 1,821 40 82,325 69 73 27 0 12/13/23 Overlay - AC Structural 4/1/10 23 30 MOULTON PKWY INDIAN CIRCLE LN LAGUNA HILLS DR AAC B E 1,798 38 92,647 76 100 0 0 12/20/23 Overlay - AC Structural 4/1/10 23 4 MOULTON PKWY RIDGE ROUTE DR SANTA MARIA AVE AAC B F 1,361 48 60,721 70 96 3 1 12/20/23 Overlay - AC Structural 7/1/11 23 5 MOULTON PKWY RIDGE ROUTE DR EL PACIFICO DR AAC B F 1,539 50 69,992 77 100 0 0 12/17/23 Overlay - AC Structural 7/1/11 23 6 MOULTON PKWY MANDEVILLE DR LA PAZ RD AAC B C 1,619 48 79,329 70 50 50 0 12/17/23 Surface Course - AC 7/1/99 23 7 MOULTON PKWY ALICIA PKWY VIA LOMAS AAC B C 830 49 33,597 76 87 0 13 12/17/23 Surface Course - AC 7/1/96 23 8 MOULTON PKWY MANDEVILLE DR ALICIA PKWY AAC B C 1,487 48 77,033 77 67 30 3 12/20/23 Surface Course - AC 7/1/99 23 9 MOULTON PKWY VIA LOMAS INDIAN HILL LN AAC B E 1,037 42 45,239 62 39 51 10 12/17/23 Overlay - AC Structural 4/1/10 27 1 OSO PKWY NOTTINGHAM CT BRIDLEWOOD DR AAC B B 2,153 42 92,074 67 30 39 31 12/13/23 Overlay - AC Structural 7/1/08

Page 2 of 11 ends
Page 493 of 570 ends

City of Laguna Hills, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, Name Order (A-Z)
Branch ID Sec ID Name From To Type Rank Zone L W Area PCI PCI Pct Climate PCI Pct Load PCI Pct Other Insp. Date Work Type Work Date 27 10 OSO PKWY NELLIE GAIL RD WEST HAVEN DR AAC B B 2,388 43 100,126 74 68 20 12 12/13/23 Overlay - AC Structural 7/1/08 27 11 OSO PKWY E. CITY LIMITS CABOT RD AAC B B 207 47 13,080 88 100 0 0 12/29/23 Surface Course - AC 7/1/99 27 12 OSO PKWY TOMBSTONE RD CABOT RD AAC B B 365 54 23,851 62 80 0 20 12/28/23 Surface Course - AC 7/1/99 27 13 OSO PKWY NELLIE GAIL RD NOTTINGHAM RD AAC B B 1,176 43 49,492 66 57 43 0 12/13/23 Overlay - AC Structural 7/1/08 27 14 OSO PKWY NOTTINGHAM CT NELLIE GAIL RD AAC B B 1,176 43 51,748 76 46 43 11 12/13/23 Overlay - AC Structural 7/1/08 27 15 OSO PKWY BRIDLEWOOD DR TOMBSTONE RD AAC B B 2,225 42 96,729 64 79 14 7 12/13/23 Overlay - AC Structural 7/1/08 27 16 OSO PKWY TOMBSTONE RD BRIDLEWOOD DR AAC B B 2,225 42 96,808 75 60 24 16 12/13/23 Overlay - AC Structural 7/1/08 27 2 OSO PKWY MOULTON PKWY WEST HAVEN DR AAC B B 744 43 31,598 79 88 10 2 12/20/23 Overlay - AC Structural 7/1/08 27 3 OSO PKWY MOULTON PKWY W. CITY LIMITS AAC B B 209 68 8,093 86 100 0 0 12/28/23 Surface Course - AC 7/1/99 27 4 OSO PKWY WEST HAVEN DR NELLIE GAIL RD AAC B B 2,357 43 100,405 70 57 28 15 12/13/23 Overlay - AC Structural 7/1/08 27 5 OSO PKWY CABOT RD E. CITY LIMITS AAC B B 207 47 7,423 86 64 36 0 12/29/23 Surface Course - AC 7/1/99 27 6 OSO PKWY CABOT RD TOMBSTONE RD AAC B B 410 54 19,462 74 68 8 24 12/28/23 Surface Course - AC 7/1/99 27 7 OSO PKWY W. CITY LIMITS MOULTON PKWY AAC B B 209 40 13,520 88 98 0 2 12/28/23 Surface Course - AC 7/1/99 27 8 OSO PKWY BRIDLEWOOD DR NOTTINGHAM CT AAC B B 2,116 42 88,131 72 50 39 11 12/13/23 Overlay - AC Structural 7/1/08 27 9 OSO PKWY WEST HAVEN DR MOULTON PKWY AAC B B 746 43 38,708 74 65 35 0 12/20/23 Overlay - AC Structural 7/1/08 28 1 PASEO DE VALENCIA CALLE DE LA MAGDALENA HEALTH CENTER DR AAC B E 1,139 34 45,817 56 35 61 4 12/29/23 Overlay - AC Structural 7/1/08 28 10 PASEO DE VALENCIA KENNINGTON DR LOS ALISOS BLVD AAC B E 1,233 35 50,394 56 65 31 4 12/29/23 Overlay - AC Structural 7/1/08 28 11 PASEO DE VALENCIA CABOT RD PINE NUT RD AAC B D 784 29 20,531 85 96 0 4 12/6/23 Overlay - AC Structural 7/10/17 28 12 PASEO DE VALENCIA HILLARY LN VELASQUEZ RD AAC B D 1,021 38 40,980 79 89 10 1 12/13/23 Overlay - AC Structural 7/1/08 28 13 PASEO DE VALENCIA LA PAZ RD (W) ERICSON WY AAC B D 1,049 38 39,294 75 49 50 1 12/17/23 Surface Course - AC 7/1/04 28 14 PASEO DE VALENCIA PINE NUT RD (W) MACKENZIE ST AAC B D 827 29 23,657 86 76 24 0 12/6/23 Overlay - AC Structural 7/10/17 28 15 PASEO DE VALENCIA VELASQUEZ RD ERICSON WY AAC B D 1,092 38 42,317 73 98 0 2 12/13/23 Surface Course - AC 7/1/04 28 16 PASEO DE VALENCIA SUNBURST AVE ALICIA PKWY AAC B D 1,187 38 57,590 65 66 34 0 12/13/23 Overlay - AC Structural 7/1/08 28 17 PASEO DE VALENCIA HILLARY LN SUNBURST AVE AAC B D 465 38 17,685 66 77 17 6 12/13/23 Overlay - AC Structural 7/1/08 28 18 PASEO DE VALENCIA PINE NUT RD CABOT RD AAC B D 777 29 21,385 87 77 0 23 12/6/23 Overlay - AC Structural 7/10/17 28 19 PASEO DE VALENCIA ALICIA PKWY SUNBURST AVE AAC B D 1,271 38 49,506 75 87 6 7 12/17/23 Overlay - AC Structural 7/1/08 28 2 PASEO DE VALENCIA EL TORO RD CALLE DE LA PLATA AAC B E 1,040 40 45,446 56 46 30 24 12/28/23 Overlay - AC Structural 7/1/08 28 20 PASEO DE VALENCIA SUNBURST AVE HILLARY LN AAC B D 475 38 19,001 85 99 0 1 12/17/23 Overlay - AC Structural 7/1/08 28 21 PASEO DE VALENCIA VELASQUEZ RD HILLARY LN AAC B D 988 38 37,611 73 60 19 21 12/13/23 Overlay - AC Structural 7/1/08 28 22 PASEO DE VALENCIA ERICSON WY VELASQUEZ RD AAC B D 1,063 38 43,233 69 51 48 1 12/13/23 Surface Course - AC 7/1/04 28 23 PASEO DE VALENCIA ERICSON WY LA PAZ RD AAC B D 1,032 38 41,586 74 81 0 19 12/17/23 Surface Course - AC 7/1/04 28 24 PASEO DE VALENCIA ALICIA PKWY LAGUNA HILLS DR AAC B E 1,515 52 72,633 71 56 17 27 12/28/23 Overlay - AC Structural 7/1/08 28 25 PASEO DE VALENCIA MACKENZIE ST LA PAZ RD AAC B D 1,488 29 49,406 82 100 0 0 12/6/23 Overlay - AC Structural 7/10/17 28 26 PASEO DE VALENCIA LA PAZ RD MACKENZIE ST AAC B D 1,468 30 43,922 81 100 0 0 12/17/23 Overlay - AC Structural 7/10/17 28 27 PASEO DE VALENCIA HEALTH CENTER DR CALLE DE LA MAGDALENA AAC B E 1,088 40 43,154 44 28 69 3 12/29/23 Overlay - AC Structural 7/1/08 28 28 PASEO DE VALENCIA EL TORO RD AVE DE LA CARLOTA AAC B F 1,267 41 41,587 83 96 0 4 12/7/23 Overlay - AC Structural 7/1/05 28 29 PASEO DE VALENCIA LOS ALISOS BLVD HEALTH CENTER DR AAC B E 1,733 45 69,166 52 59 33 8 12/29/23 Overlay - AC Structural 7/1/08 28 3 PASEO DE VALENCIA CALLE DE LA PLATA CALLE DE LA MAGDALENA AAC B E 742 36 30,117 55 59 38 3 12/29/23 Overlay - AC Structural 7/1/08 28 30 PASEO DE VALENCIA CALLE DE LA PLATA EL TORO RD AAC B E 1,008 40 47,444 63 45 55 0 12/29/23 Overlay - AC Structural 7/1/08 28 31 PASEO DE VALENCIA CALLE DE LA MAGDALENA CALLE DE LA PLATA AAC B E 697 40 29,659 48 47 46 7 12/29/23 Overlay - AC Structural 7/1/08 28 32 PASEO DE VALENCIA LAGUNA HILLS DR BECKENHAM ST AAC B E 1,559 34 63,532 49 66 33 1 12/29/23 Overlay - AC Structural 7/1/08 28 33 PASEO DE VALENCIA BECKENHAM ST KENNINGTON DR AAC B E 570 34 23,336 54 60 35 5 12/29/23 Overlay - AC Structural 7/1/08 28 34 PASEO DE VALENCIA LOS ALISOS BLVD KENNINGTON DR AAC B E 1,287 34 53,698 59 73 19 8 12/29/23 Overlay - AC Structural 7/1/08 28 4 PASEO DE VALENCIA AVE DE LA CARLOTA EL TORO RD AAC B F 1,303 38 48,641 79 47 53 0 12/28/23 Overlay - AC Structural 7/1/05 28 5 PASEO DE VALENCIA LAGUNA HILLS DR ALICIA PKWY AAC B E 1,605 52 73,824 71 93 6 1 12/28/23 Overlay - AC Structural 7/1/08 28 6 PASEO DE VALENCIA MACKENZIE ST (W) PINE NUT RD AAC B D 827 29 25,337 87 98 0 2 12/6/23 Overlay - AC Structural 7/10/17 28 7 PASEO DE VALENCIA BECKENHAM ST LAGUNA HILLS DR AAC B E 1,554 34 60,304 62 50 45 5 12/29/23 Overlay - AC Structural 7/1/08 28 8 PASEO DE VALENCIA KENNINGTON DR BECKENHAM ST AAC B E 571 35 23,302 65 37 48 15 12/29/23 Overlay - AC Structural 7/1/08 28 9 PASEO DE VALENCIA HEALTH CENTER DR LOS ALISOS BLVD AAC B E 1,667 45 71,789 66 50 35 15 12/29/23 Overlay - AC Structural 7/1/08 33 1 RIDGE ROUTE DR PERALTA DR EAST TO WIDENING AAC B F 1,635 50 70,196 92 63 33 4 12/7/23 Overlay - AC Structural 12/1/13 33 10 RIDGE ROUTE DR AVENIDA DE LA CARLOTA NARROWS AAC B F 1,000 26 37,821 91 100 0 0 12/7/23 Overlay - AC Structural 12/1/13 33 2 RIDGE ROUTE DR MILL CREEK DR MOULTON PKWY AC B F 767 40 32,124 92 93 0 7 12/7/23 New Construction - Initial 1/1/90 33 3 RIDGE ROUTE DR PERALTA DR WEST TO WIDENING AAC B F 1,816 45 65,021 91 100 0 0 12/7/23 Overlay - AC Structural 12/1/13 33 4 RIDGE ROUTE DR SANTA VITTORIA DR MILL CREEK DR AC B F 2,443 40 76,807 95 100 0 0 12/6/23 New Construction - Initial 1/1/90 33 5 RIDGE ROUTE DR NARROWS MOULTON PKWY AAC B F 468 40 21,163 92 92 0 8 12/20/23 Overlay - AC Structural 12/1/13 33 6 RIDGE ROUTE DR MOULTON PKWY NARROWS AAC B F 470 40 16,290 90 100 0 0 12/7/23 Overlay - AC Structural 12/1/13 33 7 RIDGE ROUTE DR MOULTON PKWY MILL CREEK DR AAC B F 767 40 25,464 91 95 0 5 12/7/23 Overlay - AC Structural 11/1/21 33 8 RIDGE ROUTE DR MILL CREEK DR SANTA VITTORIA DR AAC B F 2,448 40 77,725 95 100 0 0 12/6/23 Overlay - AC Structural 11/1/21 33 9 RIDGE ROUTE DR NARROWS AVE DE LA CARLOTA AAC B F 1,047 40 38,624 94 100 0 0 12/7/23 Overlay - AC Structural 12/1/13 36 1 SANTA MARIA AVE VIA VISTA W CITY LIMITS AAC B F 950 30 23,580 87 96 0 4 12/6/23 Overlay - AC Structural 7/1/11 36 2 SANTA MARIA AVE W CITY LIMITS VIA VISTA AAC B F 979 30 23,478 88 96 0 4 12/6/23 Overlay - AC Structural 7/1/11 37 1 SANTA VITTORIA DR LANE MERGE RIDGE ROUTE DR AAC C F 332 22 4,971 90 100 0 0 12/20/23 Surface Treatment - Slurry Seal 11/1/21

Page 3 of 11 ends
Page 494 of 570 ends

City of Laguna Hills, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, Name Order (A-Z)
Branch ID Sec ID Name From To Type Rank Zone L W Area PCI PCI Pct Climate PCI Pct Load PCI Pct Other Insp. Date Work Type Work Date 37 2 SANTA VITTORIA DR LANE MERGE BRIDGE AAC C F 173 49 6,660 79 43 57 0 12/6/23 Overlay - AC Structural 7/1/11 37 4 SANTA VITTORIA DR CMTO COSTA BRIDGE AAC C F 876 38 30,457 94 100 0 0 12/6/23 Overlay - AC Structural 7/1/11 37 5 SANTA VITTORIA DR LANE MERGE CMTO COSTA AAC C F 1,250 38 45,543 92 100 0 0 12/6/23 Overlay - AC Structural 7/1/11 37 6 SANTA VITTORIA DR BASSANO EAST LAKE FOREST DR AAC C F 370 22 11,176 89 100 0 0 12/6/23 Surface Treatment - Slurry Seal 11/1/21 37 7 SANTA VITTORIA DR LAKE FOREST DR BASSANO AAC C F 392 22 8,449 88 100 0 0 12/6/23 Overlay - AC Structural 7/1/11 37 8 SANTA VITTORIA DR LANE MERGE BASSANO EAST AAC C F 419 22 10,152 96 100 0 0 12/6/23 Surface Treatment - Slurry Seal 11/1/21 37 10 SANTA VITTORIA DR RIDGE ROUTE DR LANE MERGE AAC C F 342 22 6,625 82 76 24 0 12/20/23 Overlay - AC Structural 7/1/11 37 11 SANTA VITTORIA DR LANE MERGE RIDGE ROUTE DR AAC C F 371 22 10,622 79 56 44 0 12/20/23 Overlay - AC Structural 7/1/11 37 12 SANTA VITTORIA DR RIDGE ROUTE DR LANE MERGE AAC C F 285 22 7,794 81 42 58 0 12/20/23 Surface Treatment - Slurry Seal 11/1/21 37 13 SANTA VITTORIA DR SANTA MARIA AVE BARBERA AAC C F 1,095 36 34,696 90 100 0 0 12/6/23 Overlay - AC Structural 7/1/11 37 14 SANTA VITTORIA DR BARBERA AVENIDA DEL SOL AAC C F 793 36 25,816 86 100 0 0 12/6/23 Overlay - AC Structural 7/1/11 37 15 SANTA VITTORIA DR AVENIDA DEL SOL SAN REMO DR AAC C F 513 36 16,608 90 100 0 0 12/6/23 Overlay - AC Structural 7/1/11 37 16 SANTA VITTORIA DR SAN REMO DR LANE MERGE AAC C F 670 36 26,017 91 71 29 0 12/6/23 Overlay - AC Structural 7/1/11 37 9 SANTA VITTORIA DR BASSANO EAST LANE MERGE AAC C F 401 22 9,662 88 100 0 0 12/6/23 Overlay - AC Structural 7/1/11

42.6 9,067,736
Locals
41 1 ABILENE CIR HIDDEN TRAIL RD WEST END AAC E A 410 38 16,081 92 100 0 0 4/8/22 Overlay - AC Structural 8/1/14 42 1 ADAMO SORESINA END AC E F 308 35 16,544 91 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 1 1 ALAMEDA AVE DEL MONTE ST ALISO HILLS DR AAC E C 474 38 16,388 88 100 0 0 11/30/23 Overlay - AC Structural 7/1/11 1 2 ALAMEDA AVE EL PRADO ST DEL MONTE ST AAC E C 730 38 27,165 84 60 19 21 11/30/23 Overlay - AC Structural 7/1/11 1 3 ALAMEDA AVE EL PRADO ST ELENA DR AAC E C 637 38 22,561 90 100 0 0 11/30/23 Overlay - AC Structural 7/1/11 1 4 ALAMEDA AVE ELENA DR MONTE ROYALE ST AAC E C 771 38 27,118 76 57 28 15 11/30/23 Overlay - AC Structural 7/1/11 1 5 ALAMEDA AVE LA PAZ RD MONTE ROYALE ST AAC E C 449 38 15,032 79 76 20 4 11/26/23 Crack Sealing - AC 7/1/05 1 5 ALAMEDA AVE LA PAZ RD MONTE ROYALE ST AAC E C 449 38 15,032 79 76 20 4 11/26/23 Grinding (Localized) 7/1/05 1 5 ALAMEDA AVE LA PAZ RD MONTE ROYALE ST AAC E C 449 38 15,032 79 76 20 4 11/26/23 Overlay - AC Structural 7/1/05 1 5 ALAMEDA AVE LA PAZ RD MONTE ROYALE ST AAC E C 449 38 15,032 79 76 20 4 11/26/23 Patching - AC Deep 7/1/05 43 1 ALCALDE DR VERDUGO DR PERALTA DR AAC E F 1,560 43 64,688 92 100 0 0 3/14/22 Surface Treatment - Slurry Seal 11/1/21 44 1 ALISAL AVE SARITA DR LINDA VISTA DR AAC E C 970 33 31,319 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 44 2 ALISAL AVE LINDA VISTA DR PASEO DE VALENCIA AAC E C 120 37 4,532 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 5 1 ALISO HILLS DR LA CIENEGA ST SIERRA BONITA DR AAC E C 753 38 27,153 80 63 21 16 11/30/23 Grinding (Localized) 7/1/05 5 1 ALISO HILLS DR LA CIENEGA ST SIERRA BONITA DR AAC E C 753 38 27,153 80 63 21 16 11/30/23 Overlay - AC Structural 7/1/05 5 1 ALISO HILLS DR LA CIENEGA ST SIERRA BONITA DR AAC E C 753 38 27,153 80 63 21 16 11/30/23 Patching - AC Deep 7/1/05 5 2 ALISO HILLS DR LA PAZ RD LUNA BONITA DR AAC E C 453 38 15,254 83 88 12 0 11/30/23 Crack Sealing - AC 7/1/05 5 2 ALISO HILLS DR LA PAZ RD LUNA BONITA DR AAC E C 453 38 15,254 83 88 12 0 11/30/23 Grinding (Localized) 7/1/05 5 2 ALISO HILLS DR LA PAZ RD LUNA BONITA DR AAC E C 453 38 15,254 83 88 12 0 11/30/23 Overlay - AC Thin 7/1/05 5 2 ALISO HILLS DR LA PAZ RD LUNA BONITA DR AAC E C 453 38 15,254 83 88 12 0 11/30/23 Patching - AC Deep 7/1/05 5 3 ALISO HILLS DR LUNA BONITA DR LA SERRA ST AAC E C 1,689 38 61,689 78 52 47 1 11/30/23 Crack Sealing - AC 7/1/05 5 3 ALISO HILLS DR LUNA BONITA DR LA SERRA ST AAC E C 1,689 38 61,689 78 52 47 1 11/30/23 Grinding (Localized) 7/1/05 5 3 ALISO HILLS DR LUNA BONITA DR LA SERRA ST AAC E C 1,689 38 61,689 78 52 47 1 11/30/23 Overlay - AC Structural 7/1/05 5 3 ALISO HILLS DR LUNA BONITA DR LA SERRA ST AAC E C 1,689 38 61,689 78 52 47 1 11/30/23 Patching - AC Deep 7/1/05 5 4 ALISO HILLS DR LA SERRA ST MENDOCINO AV AAC E C 763 38 28,071 80 90 10 0 11/26/23 Crack Sealing - AC 7/1/05 5 4 ALISO HILLS DR LA SERRA ST MENDOCINO AV AAC E C 763 38 28,071 80 90 10 0 11/26/23 Grinding (Localized) 7/1/05 5 4 ALISO HILLS DR LA SERRA ST MENDOCINO AV AAC E C 763 38 28,071 80 90 10 0 11/26/23 Overlay - AC Structural 7/1/05 5 4 ALISO HILLS DR LA SERRA ST MENDOCINO AV AAC E C 763 38 28,071 80 90 10 0 11/26/23 Patching - AC Deep 7/1/05 5 5 ALISO HILLS DR MENDOCINO AV LA CIENEGA ST AAC E C 992 38 35,696 83 85 0 15 11/30/23 Grinding (Localized) 7/1/05 5 5 ALISO HILLS DR MENDOCINO AV LA CIENEGA ST AAC E C 992 38 35,696 83 85 0 15 11/30/23 Overlay - AC Structural 7/1/05 5 5 ALISO HILLS DR MENDOCINO AV LA CIENEGA ST AAC E C 992 38 35,696 83 85 0 15 11/30/23 Patching - AC Deep 7/1/05 5 6 ALISO HILLS DR ALICIA PKWY LA CIENEGA ST AAC E C 713 38 23,624 82 58 42 0 11/30/23 Grinding (Localized) 7/1/05 5 6 ALISO HILLS DR ALICIA PKWY LA CIENEGA ST AAC E C 713 38 23,624 82 58 42 0 11/30/23 Overlay - AC Thin 7/1/05 5 6 ALISO HILLS DR ALICIA PKWY LA CIENEGA ST AAC E C 713 38 23,624 82 58 42 0 11/30/23 Patching - AC Deep 7/1/05 45 1 ALTA LOMA CT SANTA ROSA AVE EAST END AAC E C 460 37 18,714 100 0 0 0 1/1/20 Overlay - AC Fabric 1/1/20 46 1 ALTA MIRA DR ALEMEDA AVE BUENA VISTA DR AAC E C 400 37 14,174 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 47 1 AMALIA ST YOLANDA ST CARMEL ST AC E C 210 33 6,787 95 100 0 0 11/22/23 Surface Treatment - Slurry Seal 11/1/21 48 1 ANACAPA ST SAN PEDRO AVE EL PRADO ST AAC E C 770 33 24,949 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 49 1 ANADALE DR VISTA VIEJO N CNR NORTH END AAC E A 890 35 31,942 94 85 0 15 4/7/22 Overlay - AC Structural 8/1/14 50 1 ANCONA TREVISO END AAC E F 306 35 18,073 93 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 51 2 ANDREA ST LUPITA ST SOUTH END AC E C 269 39 11,066 90 100 0 0 11/26/23 Surface Treatment - Slurry Seal 11/1/21 51 1 ANDREA ST LUPITA ST NORTH END AC E C 272 39 11,390 91 100 0 0 11/26/23 Surface Treatment - Slurry Seal 11/1/21 345 1 ANVIL CIR FARRIER CIR NORTH END AAC E B 707 33 28,842 95 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 52 1 APPALOOSA PL MUSTANG DR N CNR LA PAZ RD S CNR AAC E B 240 35 9,839 89 24 76 0 11/30/23 Surface Treatment - Slurry Seal 11/1/21 53 1 ASHLAND DR KENNINGTON DR WEYBURN DR AAC E E 1,175 37 43,309 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 55 1 AVENIDA AVALON VIA BALBOA SOUTH END AAC E E 210 33 8,692 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20

Page 4 of 11 ends
Page 495 of 570 ends

City of Laguna Hills, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, Name Order (A-Z)
Branch ID Sec ID Name From To Type Rank Zone L W Area PCI PCI Pct Climate PCI Pct Load PCI Pct Other Insp. Date Work Type Work Date 6 15 AVENIDA DE LA CARLOTA LOS ALISOS BL S CNR CHRISTINA CT N CNR AAC E E 155 34 5,652 90 100 0 0 12/4/23 Overlay - AC Structural 6/1/18 56 2 BARBERA MARSALA PESARO AAC E F 1,179 39 42,593 90 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 56 1 BARBERA SANTA VITTORIA MARSALA AAC E F 303 39 9,707 90 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 57 2 BARENTS ST WILKES PL HILLARY LN AAC E D 135 33 4,764 95 100 0 0 4/6/22 Overlay - AC Fabric 8/1/14 57 3 BARENTS ST WILKES PL EAST END AAC E D 1,310 36 46,447 86 50 42 8 5/11/20 Overlay - AC Structural 8/1/12 57 1 BARENTS ST HILLARY LN GRISSOM RD AAC E D 1,300 33 43,337 85 56 37 7 4/6/22 Surface Treatment - Slurry Seal 6/1/18 58 1 BARKSTONE LN VISTA VIEJO NORTH END AAC E A 660 36 23,809 93 96 0 4 4/7/22 Overlay - AC Structural 8/1/14 59 1 BAUTISTA DR PADUA DR SOUTH END AAC E D 455 33 18,690 88 60 40 0 4/6/22 Surface Treatment - Slurry Seal 6/1/18 60 1 BEARGRASS CIR LOST COLT DR SOUTH END AAC E A 165 33 7,683 84 70 30 0 11/30/23 Surface Treatment - Slurry Seal 6/1/18 61 1 BECKENHAM ST PASEO DE VALENCIA ACACIA LN AAC E E 1,063 36 35,267 100 0 0 0 1/1/20 Overlay - AC Fabric 1/1/20 61 2 BECKENHAM ST ACACIA LN WILKES PL AAC E E 591 36 18,845 100 0 0 0 1/1/20 Overlay - AC Fabric 1/1/20 62 1 BENTLEY LN ALICIA PKWY EAST END AAC E D 1,555 38 57,924 90 53 22 25 5/11/20 Overlay - AC Structural 8/1/12 63 1 BIANCO MARSALA END AAC E F 348 35 15,781 92 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 64 1 BLACK HORSE LN LOST COLT DR EAST END AAC E A 850 36 30,715 89 52 48 0 5/11/20 Overlay - AC Structural 8/1/12 65 1 BOONE PL CADALLAC DR SOUTH END AAC E D 170 43 8,064 81 32 68 0 4/6/22 Surface Treatment - Slurry Seal 6/1/18 66 1 BOOTHILL CT DILLION RD WEST END AAC E A 475 38 17,758 74 72 28 0 4/8/22 Overlay - AC Structural 8/1/14 67 1 BOOTSTRAP PL GALLUP CIR WEST END AAC E B 175 44 8,026 91 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 68 1 BRADFORD LN NOTTINGHAM CT NORTH END AAC E A 225 41 7,108 91 49 45 6 5/11/20 Overlay - AC Structural 8/1/12 69 3 BRIDLEWOOD DR OSO PKWY SADDLE ROCK PL AAC E B 220 36 8,796 99 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 69 2 BRIDLEWOOD DR OSO PKWY LAUREL CREST DR AAC E A 1,250 38 44,957 90 46 54 0 5/11/20 Overlay - AC Structural 8/1/12 69 1 BRIDLEWOOD DR FLINTLOCK LN NELLIE GAIL RD AAC E B 490 39 17,957 95 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 69 4 BRIDLEWOOD DR LAUREL CREST DR MEADOW CREST DR AAC E A 791 38 28,270 89 45 48 7 5/11/20 Overlay - AC Structural 8/1/12 69 5 BRIDLEWOOD DR SADDLE ROCK PL FLINTLOCK LN AAC E B 755 41 27,758 95 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 69 6 BRIDLEWOOD DR MEADOW CREST DR VISTA VIEJO AAC E A 1,476 38 53,923 93 65 35 0 5/11/20 Overlay - AC Structural 8/1/12 70 1 BROKEN BIT LN BUCKSKIN DR SOUTH END AAC E B 785 36 29,498 89 80 20 0 11/26/23 Surface Treatment - Slurry Seal 11/1/21 71 1 BUCKBOARD LN BUCKSKIN DR STENSON PL AAC E B 1,217 39 45,760 75 73 27 0 12/4/23 Surface Treatment - Slurry Seal 11/1/21 71 2 BUCKBOARD LN STENSON PL NELLIE GAIL RD AAC E B 1,691 39 62,796 80 55 43 2 11/26/23 Overlay - AC Structural 7/1/11 72 1 BUCKLESTONE CT NELLIE GAIL RD NORTH END AAC E B 350 39 14,001 93 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 73 1 BUCKSKIN DR NELLIE GAIL RD SILVER SADDLE LN AAC E B 1,329 39 49,275 100 0 0 0 11/1/21 Overlay - AC Structural 11/1/21 73 2 BUCKSKIN DR SILVER SADDLE LN MUSTANG DR AAC E B 904 39 33,689 100 0 0 0 11/1/21 Overlay - AC Structural 11/1/21 73 3 BUCKSKIN DR MUSTANG DR BUCKBOARD LN AAC E B 1,001 39 38,062 100 0 0 0 11/1/21 Overlay - AC Structural 11/1/21 74 1 BUENA VISTA DR LOS GATOS DR NORTH END AAC E C 1,130 38 43,072 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 75 2 CADILLAC DR BOONE PL HILLARY LN AAC E D 422 33 13,391 92 90 0 10 4/6/22 Overlay - AC Fabric 8/1/14 75 1 CADILLAC DR GRISSOM RD BOONE PL AAC E D 575 33 18,649 83 47 37 16 4/6/22 Surface Treatment - Slurry Seal 6/1/18 76 1 CAJON DR WELLS FARGO DR COSTEAU DR AAC E D 560 37 17,551 88 77 12 11 4/8/22 Surface Treatment - Slurry Seal 6/1/18 77 1 CALERO AVE LA MIRADA ST EL CONEJO LN AAC E C 290 33 10,417 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 78 1 CALIFIA DR MACKENZIE ST LA SUEN RD AAC E D 865 36 30,061 81 54 43 3 4/6/22 Surface Treatment - Slurry Seal 6/1/18 79 1 CALLE CARMEL HENDON ST SOUTH END AAC E E 570 26 16,440 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 80 2 CAMBERWELL ST HENDON COUSTEU ST AAC E E 607 37 22,917 84 65 35 0 4/6/22 Overlay - AC Structural 7/1/11 80 1 CAMBERWELL ST HON AVE HENDON ST AAC E E 1,103 37 39,161 84 64 36 0 4/6/22 Overlay - AC Structural 7/1/11 81 1 CARLSON CT LAUREL CREST DR EAST END AAC E A 135 33 7,131 92 66 0 34 12/1/23 Overlay - AC Structural 8/1/14 82 1 CARMEL ST SOUTH END NORTH END AC E C 865 35 32,519 92 100 0 0 11/22/23 Surface Treatment - Slurry Seal 11/1/21 83 1 CAROL LN JULIE AVE EAST END AAC E E 430 37 16,227 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 84 1 CATANIA CREMONA END AAC E F 255 35 10,506 93 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 85 1 CEDARBLUFF TER WOODBLUFF RD EAST END AAC E A 845 35 30,342 88 40 60 0 4/7/22 Overlay - AC Structural 8/1/14 86 1 CHAMPLAIN RD EARHART RD VESPUCCI RD AAC E D 830 35 23,057 92 73 27 0 5/11/20 Overlay - AC Structural 8/1/12 86 4 CHAMPLAIN RD CHAMPLAIN RD END AAC E D 114 33 6,073 90 100 0 0 11/26/23 Overlay - AC Structural 7/1/12 86 2 CHAMPLAIN RD GRISSOM RD LAPAZ RD AAC E D 1,260 33 40,950 81 89 11 0 11/26/23 Surface Treatment - Slurry Seal 6/1/18 86 3 CHAMPLAIN RD PIKE RD CHARLEMAGNE RD AAC E D 725 33 25,502 85 57 43 0 5/11/20 Overlay - AC Structural 8/1/12 87 1 CHAPARREL PL NELLIE GAIL RD SOUTH END AAC E B 155 46 8,681 93 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 88 1 CHARLEMAGNE RD CHAMPLAIN RD DE SALLE ST AAC E D 535 33 17,196 88 70 30 0 5/11/20 Overlay - AC Structural 8/1/12 89 1 CHELSEA LN NOTTINGHAM CT SOUTH END AAC E A 310 33 10,946 83 27 0 73 4/7/22 Overlay - AC Structural 8/1/14 90 1 CHRISTINA CT EAST END WEST END AAC E E 1,050 36 37,048 81 92 0 8 11/22/23 Overlay - AC Structural 6/1/18 91 1 CLARINGTON DR WEYBURN DR KENNINGTON DR AAC E E 1,265 37 46,953 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 92 1 COACH SPRINGS LN HIDDEN TRAIL RD WEST END AAC E A 500 38 18,511 88 100 0 0 11/26/23 Patching - AC Deep 8/1/14 93 1 COLONNA SORESINA PESARO AAC E F 570 35 19,350 90 73 27 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 9 1 COMMERCE CENTER DR AVE DE LA CARLOTA END AAC E F 983 46 42,461 94 100 0 0 3/14/22 Surface Treatment - Slurry Seal 11/1/21 95 1 COSTEAU CT COSTEAU ST NORTH END AAC E E 110 49 5,199 76 54 46 0 4/6/22 Overlay - AC Structural 7/1/11 95 2 COSTEAU CT COSTEAU ST NORTH END AAC E E 115 48 5,694 78 100 0 0 4/6/22 Overlay - AC Structural 7/1/11 96 1 COSTEAU DR ALICIA PKWY CAJON DR AAC E D 1,980 36 70,756 84 38 57 5 4/6/22 Surface Treatment - Slurry Seal 6/1/18 97 1 COSTEAU ST ALICIA PKWY BECKENHAM ST AAC E E 1,650 36 54,739 72 57 0 43 4/6/22 Overlay - AC Structural 7/1/11 98 1 CREEK DR LINDA VISTA DR SOUTH END AAC E C 780 35 27,774 100 0 0 0 1/1/20 Overlay - AC Fabric 1/1/20

Page 5 of 11 ends
Page 496 of 570 ends

City of Laguna Hills, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, Name Order (A-Z)
Branch ID Sec ID Name From To Type Rank Zone L W Area PCI PCI Pct Climate PCI Pct Load PCI Pct Other Insp. Date Work Type Work Date 99 1 CREEKVIEW DR WEST END CHRISTINA CT AAC E E 1,315 34 45,673 79 100 0 0 12/4/23 Overlay - AC Structural 6/1/18 100 1 CREMONA TARANTO END AAC E F 319 35 13,106 93 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 101 1 CRESTA CT CREEKVIEW DR NORTH END AAC E E 160 33 7,657 86 100 0 0 11/22/23 Overlay - AC Structural 6/1/18 102 2 DAPPLE GREY DR WILD VIEW TER NELLIE GAIL RD AAC E B 1,624 34 54,591 92 100 0 0 3/16/22 Overlay - AC Structural 7/1/11 102 1 DAPPLE GREY DR NELLIE GAIL DR S CNR WILD VIEW TER AAC E B 667 34 21,927 91 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 103 1 DE SALLE ST MACKENZIE ST EARHART RD AAC E D 1,200 33 38,614 87 40 57 3 5/11/20 Overlay - AC Structural 8/1/12 103 2 DE SALLE ST EARHART RD GRISSOM RD AAC E D 1,239 33 38,918 83 48 52 0 5/11/20 Overlay - AC Structural 8/1/12 104 1 DEL LAGO DR ALCALDE DR LA CADENA DR AAC E F 1,160 44 47,409 92 100 0 0 3/14/22 Surface Treatment - Slurry Seal 11/1/21 104 2 DEL LAGO DR LA CADENA DR LAKE FOREST DR AAC E F 870 64 53,578 91 100 0 0 3/14/22 Surface Treatment - Slurry Seal 11/1/21 105 1 DEL MONTE ST ALAMEDA AVE LA CUESTA AVE AAC E C 950 37 34,363 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 106 1 DEPUTY CIR DILLION RD SOUTH END AAC E A 1,245 34 44,708 75 77 23 0 4/8/22 Overlay - AC Structural 8/1/14 107 1 DERBY CIR WILKES PL WEST END AAC E E 490 37 18,044 88 54 46 0 4/6/22 Overlay - AC Structural 7/1/11 108 1 DERBYHILL DR HIDDEN TRAIL RD WEST END AAC E A 1,140 38 45,235 94 100 0 0 4/8/22 Overlay - AC Structural 8/1/14 109 1 DESERT TRAIL NELLIE GAIL DR SOUTH END AAC E B 525 37 19,628 97 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 110 1 DEVONSHIRE RD FALLING LEAF DR NOTTINGHAM CT AAC E A 900 37 33,429 92 88 0 12 5/11/20 Overlay - AC Structural 8/1/12 111 1 DILLION RD LOST TRAIL DR EAST END AAC E A 1,840 38 70,587 80 39 61 0 4/8/22 Surface Treatment - Slurry Seal 6/1/18 112 1 EARHART RD BARENTS ST VELASQUEZ RD AAC E D 862 37 29,700 87 51 49 0 5/11/20 Overlay - AC Structural 8/1/12 112 3 EARHART RD DE SALLE DR ERICSON WY AAC E D 240 33 7,826 72 89 7 4 11/30/23 Overlay - AC Structural 7/1/11 112 2 EARHART RD DE SALLE DR CHAMPLAIN RD AAC E D 485 33 16,756 92 72 28 0 5/11/20 Overlay - AC Structural 8/1/12 112 6 EARHART RD EARHART RD SOUTH END AAC E D 118 33 6,192 96 100 0 0 4/6/22 Overlay - AC Fabric 8/1/14 112 5 EARHART RD VELASQUEZ RD LAS BOLSAS ST AAC E D 1,168 37 41,943 85 57 43 0 5/11/20 Overlay - AC Structural 8/1/12 112 4 EARHART RD ERICSON WY LAS BOLSAS ST AC E D 255 33 9,265 77 60 34 6 11/26/23 Patching - AC Deep 8/1/14 113 1 EL CAPITAN LN CREEK DR LARGO DR AAC E C 880 33 30,241 85 82 0 18 11/30/23 Overlay - AC Structural 7/1/11 114 1 EL CONEJO LN LINDA VISTA DR CALERO AVE AAC E C 930 33 29,817 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 115 1 EL DORADO DR STAGE COACH DR PRESIDIO DR AAC E D 860 33 27,880 83 39 59 2 4/8/22 Surface Treatment - Slurry Seal 6/1/18 116 2 EL PACIFICO DR MOULTON PKWY VERDUGO DR AAC E F 300 64 18,126 92 100 0 0 3/14/22 Surface Treatment - Slurry Seal 11/1/21 116 1 EL PACIFICO DR VERDUGO DR END AAC E F 235 43 13,362 93 100 0 0 3/14/22 Surface Treatment - Slurry Seal 11/1/21 117 1 EL PRADO ST ALAMEDA AVE SAN PEDRO AVE AAC E C 810 37 29,382 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 118 1 EL SEGUNDO ST ALISO HILLS DR NORTH END AAC E C 570 36 21,362 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 348 1 ELDERBROOK LN WOODBLUFF RD SOUTH END AAC E A 160 33 7,705 93 100 0 0 4/7/22 Overlay - AC Structural 8/1/14 119 1 ELENA DR LOS GATOS DR ALAMEDA AVE AAC E C 535 37 21,634 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 120 1 ELM BANK DR DEVONSHIRE RD WEST END AAC E A 510 37 18,896 94 95 0 5 4/7/22 Overlay - AC Structural 8/1/14 121 1 EMPTY SADDLE DR NELLIE GAIL RD SPOTTED PONY LN AAC E A 1,880 36 55,789 88 81 19 0 11/30/23 Surface Treatment - Slurry Seal 6/1/18 122 1 ENCANTO CT LUNA BONITA DR SOUTH END AC E C 280 39 11,487 64 52 48 0 11/22/23 New Construction - Initial 1/1/80 123 2 ERICSON WY EARHART RD PASEO DE VALENCIA AAC E D 1,393 37 49,085 74 33 33 34 4/8/22 Overlay - AC Structural 7/1/11 123 1 ERICSON WY COSTEAU DR EARHART RD AAC E D 1,105 37 38,951 85 62 33 5 4/8/22 Overlay - AC Structural 7/1/11 124 1 ERNESTINE CT LINDA FLORA ST NORTH END AAC E C 475 37 17,443 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 125 1 EUCALYPTUS DR WOODBLUFF RD EAST END AAC E A 340 32 11,189 91 56 41 3 4/7/22 Overlay - AC Structural 8/1/14 126 1 EVA ST LUPITA ST YOLANDA ST AC E C 950 33 32,987 95 100 0 0 11/22/23 Surface Treatment - Slurry Seal 11/1/21 127 1 EVERGREEN RD OAK LEAF RD FIR LN AAC E D 800 37 28,763 80 75 8 17 12/1/23 Surface Treatment - Slurry Seal 6/1/18 128 1 EXPRESS DR ELDORADO DR WEST END AAC E D 600 36 21,816 86 79 21 0 4/8/22 Surface Treatment - Slurry Seal 6/1/18 129 1 FAIRCOURT LN WOODBLUFF RD EAST END AAC E A 565 36 21,572 95 100 0 0 4/7/22 Overlay - AC Structural 8/1/14 130 1 FALLING LEAF DR DEVONSHIRE RD WOODBLUFF RD AAC E A 1,670 37 60,018 93 84 0 16 4/7/22 Overlay - AC Structural 8/1/14 131 1 FARGO RD ROCKRIDGE RD SOUTH END AAC E A 535 37 20,058 83 76 24 0 4/8/22 Overlay - AC Structural 8/1/14 344 1 FARRIER CIR MUSTANG DR NORTH END AAC E B 571 33 22,482 98 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 132 1 FIR LN EVERGREEN RD TREE TOP RD AAC E D 250 37 11,957 92 71 29 0 5/11/20 Overlay - AC Structural 8/1/12 133 1 FLETCHER PL LAUREL CREST DR EAST END AAC E A 270 40 11,011 93 96 0 4 4/7/22 Overlay - AC Structural 8/1/14 134 1 FLINTLOCK LN BRIDLEWOOD DR NORTH END AAC E B 1,015 36 35,808 91 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 135 1 FORMELLO BARBERA END AAC E F 378 35 15,607 93 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 136 2 GALLUP CIR RANGEWOOD RD NELLIE GAIL RD AAC E B 1,034 37 38,328 95 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 136 1 GALLUP CIR LA PAZ RD RANGEWOOD RD AAC E B 1,908 39 70,021 95 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 137 1 GENOVA PALERMO END AAC E F 562 35 23,671 92 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 138 1 GEORGIA SUE DR JORIE DR EAST END AAC E E 1,365 37 49,377 77 85 8 7 12/1/23 Overlay - AC Structural 7/1/05 139 2 GLEN CANYON DR BRIDLEWOOD DR END AAC E B 146 33 7,105 95 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 139 1 GLEN CANYON DR NELLIE GAIL RD SOUTH END AAC E B 1,985 38 70,050 91 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 140 1 GOLD DUST LN HIDDEN TRAIL RD SOUTH END AAC E A 910 36 32,723 84 75 25 0 4/8/22 Overlay - AC Structural 8/1/14 141 1 GOLDEN ROD CIR MAGNOLIA CT EAST END AAC E A 85 63 5,132 94 100 0 0 4/7/22 Overlay - AC Structural 8/1/14 142 1 GORDON RD MOULTON PKWY IMPERIAL DR AAC E C 450 37 18,217 100 0 0 0 8/31/21 Overlay - AC Structural 8/31/21 143 1 GRAVINO PESARO END AAC E F 280 35 12,328 93 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 346 1 GREEN HILLS LN WOODBLUFF RD RAIN TREE RD AAC E A 597 33 18,373 94 100 0 0 4/7/22 Overlay - AC Structural 8/1/14 14 1 GREENFIELD DR SR 73 RAMPS HIDDEN TRAIL RD AAC E A 794 38 32,549 92 89 0 11 5/11/20 Overlay - AC Structural 8/1/12 144 1 GRISSOM CIR HILLARY LN WEST END AAC E D 120 47 6,001 93 100 0 0 4/6/22 Overlay - AC Structural 7/1/14

Page 6 of 11 ends
Page 497 of 570 ends

City of Laguna Hills, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, Name Order (A-Z)
Branch ID Sec ID Name From To Type Rank Zone L W Area PCI PCI Pct Climate PCI Pct Load PCI Pct Other Insp. Date Work Type Work Date 145 4 GRISSOM RD MACKENZIE ST WEST END AAC E D 535 36 19,372 88 67 0 33 11/26/23 Surface Treatment - Slurry Seal 6/1/18 145 3 GRISSOM RD LAS BOLSAS ST WILKES PL AAC E D 1,785 33 57,687 95 85 4 11 4/6/22 Overlay - AC Fabric 8/1/14 145 6 GRISSOM RD GRISSOM RD NORTH END AAC E D 132 33 6,783 82 88 11 1 12/4/23 Overlay - AC Structural 7/1/11 145 1 GRISSOM RD PIKE RD LA PAZ RD AC E D 125 33 4,415 84 100 0 0 12/1/23 Surface Treatment - Slurry Seal 6/1/18 145 2 GRISSOM RD BARENTS ST EAST END AAC E D 925 35 28,657 80 42 56 2 4/6/22 Surface Treatment - Slurry Seal 6/1/18 145 5 GRISSOM RD ERICSON WY PIKE RD AAC E D 1,000 35 29,111 81 65 33 2 4/8/22 Overlay - AC Structural 7/1/11 146 1 HARRINGTON CT NOTTINGHAM CT NORTH END AAC E A 395 38 15,142 94 86 0 14 4/7/22 Overlay - AC Structural 8/1/14 147 1 HARTOG ST VELASQUEZ RD LAS BOLSAS ST AAC E D 875 31 26,627 93 60 34 6 4/6/22 Overlay - AC Fabric 8/1/14 351 1 HEALTH CENTER DR PASEO DE VALENCIA CALLE DE LA LOUISA AC E E 760 20 24,915 88 100 0 0 12/4/23 New Construction - Initial 1/1/80 351 2 HEALTH CENTER DR CALLE DE LA LOUISA PASEO DE VALENCIA AC E E 769 20 24,057 89 59 41 0 12/4/23 New Construction - Initial 1/1/80 148 2 HENDON ST CAMBERWELL ST CALLE CARMEL AAC E E 500 37 19,577 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 148 1 HENDON ST COSTEAU ST CAMBERWELL ST AAC E E 1,255 33 42,452 81 100 0 0 4/6/22 Overlay - AC Structural 7/1/05 342 2 HIDDEN TRAIL RD PINESTRAP CIR DERBYHILL DR AAC E A 1,580 38 59,562 88 40 60 0 5/11/20 Overlay - AC Structural 8/1/12 342 4 HIDDEN TRAIL RD STAGELINE DR NELLIE GAIL RD AAC E A 1,944 38 72,936 82 88 10 2 4/8/22 Overlay - AC Structural 8/1/14 342 3 HIDDEN TRAIL RD DERBYHILL DR STAGELINE DR AAC E A 1,392 38 52,671 85 40 60 0 5/11/20 Overlay - AC Structural 8/1/12 342 1 HIDDEN TRAIL RD GREENFIELD DR PINESTRAP CIR AAC E A 1,612 38 61,892 92 65 32 3 5/11/20 Overlay - AC Structural 8/1/12 149 1 HIGHPLAINS TER GLEN CANYON DR EAST END AAC E B 515 37 19,710 93 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 150 1 HIGHWOOD CIR ROCKING HORSE LN NORTH END AAC E A 805 40 27,201 81 63 0 37 12/1/23 Surface Treatment - Slurry Seal 6/1/18 151 1 HILLARY LN BARENTS ST PASEO DE VALENCIA AAC E D 1,050 37 42,219 91 77 0 23 4/6/22 Overlay - AC Fabric 8/1/14 152 1 HITCHING RAIL RD PRIARESTONE DR NELLIE GAIL RD AAC E B 1,150 39 44,158 96 100 0 0 3/16/22 Overlay - AC Structural 7/1/11 152 2 HITCHING RAIL RD CABOT RD TOMBSTONE RD AAC E B 430 39 15,589 98 100 0 0 3/16/22 Overlay - AC Structural 7/1/07 152 3 HITCHING RAIL RD TOMBSTONE RD PRIARESTONE DR AAC E B 1,410 39 59,753 95 100 0 0 3/16/22 Overlay - AC Structural 7/1/11 15 1 HON AVE ALICIA PKWY CAMBERWELL ST AAC E E 777 27 20,311 82 62 36 2 3/14/22 Overlay - AC Structural 7/1/11 15 2 HON AVE CAMBERWELL ST ALICIA PKWY AAC E E 829 37 22,925 80 40 60 0 3/14/22 Overlay - AC Structural 7/1/11 15 3 HON AVE CAMBERWELL ST GEORGIA SUE AAC E E 1,482 33 57,324 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 343 1 HORSESHOE CIR RED CORRAL RD SOUTH END AAC E B 396 33 16,167 98 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 154 1 HOUSTON TRAIL NELLIE GAIL RD SOUTH END AAC E B 860 36 31,566 98 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 16 1 INDIAN HILL LN MOULTON PKWY ASH CREEK LN AAC E E 662 38 23,777 84 97 0 3 12/1/23 Crack Sealing - AC 7/1/05 16 1 INDIAN HILL LN MOULTON PKWY ASH CREEK LN AAC E E 662 38 23,777 84 97 0 3 12/1/23 Grinding (Localized) 7/1/05 16 1 INDIAN HILL LN MOULTON PKWY ASH CREEK LN AAC E E 662 38 23,777 84 97 0 3 12/1/23 Overlay - AC Structural 7/1/05 16 1 INDIAN HILL LN MOULTON PKWY ASH CREEK LN AAC E E 662 38 23,777 84 97 0 3 12/1/23 Patching - AC Deep 7/1/05 16 2 INDIAN HILL LN LAGUNA HILLS DR OWL HILL LN AAC E E 485 38 16,188 82 55 28 17 12/4/23 Crack Sealing - AC 7/1/05 16 2 INDIAN HILL LN LAGUNA HILLS DR OWL HILL LN AAC E E 485 38 16,188 82 55 28 17 12/4/23 Grinding (Localized) 7/1/05 16 2 INDIAN HILL LN LAGUNA HILLS DR OWL HILL LN AAC E E 485 38 16,188 82 55 28 17 12/4/23 Overlay - AC Structural 7/1/05 16 2 INDIAN HILL LN LAGUNA HILLS DR OWL HILL LN AAC E E 485 38 16,188 82 55 28 17 12/4/23 Patching - AC Deep 7/1/05 16 3 INDIAN HILL LN OWL HILL LN ASH CREEK LN AAC E E 909 38 33,150 73 79 0 21 12/1/23 Crack Sealing - AC 7/1/05 16 3 INDIAN HILL LN OWL HILL LN ASH CREEK LN AAC E E 909 38 33,150 73 79 0 21 12/1/23 Grinding (Localized) 7/1/05 16 3 INDIAN HILL LN OWL HILL LN ASH CREEK LN AAC E E 909 38 33,150 73 79 0 21 12/1/23 Overlay - AC Structural 7/1/05 16 3 INDIAN HILL LN OWL HILL LN ASH CREEK LN AAC E E 909 38 33,150 73 79 0 21 12/1/23 Patching - AC Deep 7/1/05 155 1 IRONWOOD DR GREEN HILLS LN MIDDLERIDGE LN AAC E A 900 33 31,745 95 100 0 0 4/7/22 Overlay - AC Structural 8/1/14 156 1 JORIE DR WEYBURN DR GEORGIA SUE AAC E E 490 37 19,881 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 157 1 JULIE AVE HON AVE SARA LN AAC E E 740 37 26,227 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 158 1 KATIE AVE JULIE AVE EAST END AAC E E 435 37 16,218 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 159 1 KENNINGTON DR PASEO DE VALENCIA CLARINGTON DR AAC E E 200 37 7,798 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 160 1 KIM CIR GEORGIA SUE DR SOUTH END AAC E E 450 37 16,924 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 161 1 KNOTTY PINE RD McINTYRE ST MACKENZIE ST AAC E D 525 33 19,009 83 100 0 0 11/26/23 Surface Treatment - Slurry Seal 6/1/18 17 1 LA CADENA DR PERALTA DR DEL LAGO DR AAC E F 541 40 22,248 92 100 0 0 3/14/22 Surface Treatment - Slurry Seal 11/1/21 17 2 LA CADENA DR VERDUGO DR DEL LAGO DR AAC E F 709 40 29,708 92 100 0 0 3/14/22 Surface Treatment - Slurry Seal 11/1/21 163 1 LA CIENEGA ST RIO GRANDE AVE SIERRA BONITA DR AAC E C 1,160 37 39,372 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 163 2 LA CIENEGA ST LA CIENEGA ST ALISO HILLS DR AAC E C 130 37 4,993 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 164 1 LA CUESTA AVE TERRA BELLA AVE SAUSALITO ST AAC E C 1,350 33 45,043 100 0 0 0 1/1/20 Overlay - AC Fabric 1/1/20 165 1 LA HABRA CT SARITA DR EAST END AAC E C 330 33 12,657 100 0 0 0 1/1/20 Overlay - AC Fabric 1/1/20 166 1 LA MIRADA ST ALISAL LN LINDA VISTA DR AAC E C 1,375 33 44,926 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 167 1 LA SERRA ST ALISO HILLS DR NORTH END AC E C 715 38 26,496 67 44 56 0 12/1/23 New Construction - Initial 1/1/80 168 1 LA SUEN RD CALIFIA DR PIKE RD AAC E D 1,000 36 39,176 89 83 0 17 4/6/22 Surface Treatment - Slurry Seal 6/1/18 169 1 LARGO DR WEST END LINDA VISTA DR AAC E C 1,430 35 50,183 84 51 49 0 11/30/23 Overlay - AC Structural 7/1/11 170 1 LAS ALTURAS AVE MANDEVILLE DR MONTE ROYALE ST AAC E C 1,025 37 33,124 73 34 62 4 11/26/23 Overlay - AC Structural 7/1/11 171 1 LAS ALTURAS CT LAS ALTURAS AVE EAST END AAC E C 170 43 7,714 80 88 10 2 12/4/23 Overlay - AC Structural 7/1/11 172 1 LAS BOLSAS ST TASMAN RD GRISSOM RD AAC E D 1,830 33 60,223 88 54 46 0 5/11/20 Overlay - AC Structural 8/1/12 173 1 LAURAL CREST DR BRIDLEWOOD DR PATTERSON AAC E A 1,400 37 51,606 91 57 43 0 5/11/20 Overlay - AC Structural 8/1/12 174 1 LINDA FLORA ST EAST END EL SEGUNDO ST AAC E C 890 35 32,775 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 175 2 LINDA VISTA DR ALISAL AVE SARITA DR AAC E C 928 37 33,659 79 91 0 9 11/30/23 Overlay - AC Structural 7/1/11

Page 7 of 11 ends
Page 498 of 570 ends

City of Laguna Hills, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, Name Order (A-Z)
Branch ID Sec ID Name From To Type Rank Zone L W Area PCI PCI Pct Climate PCI Pct Load PCI Pct Other Insp. Date Work Type Work Date 175 1 LINDA VISTA DR LARGO DR ALISAL AVE AAC E C 1,037 37 36,215 81 88 12 0 11/30/23 Overlay - AC Structural 7/1/11 176 1 LIPARI TERAMO END AAC E F 368 35 17,337 93 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 177 1 LOMBARDI PASERO END AAC E F 315 35 13,789 92 44 56 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 178 1 LONE ACRES LN LOST TRAIL DR EAST END AAC E A 520 37 20,025 80 64 34 2 4/8/22 Overlay - AC Structural 8/1/14 179 1 LONE PINE CIR HIDDEN TRAIL RD EAST END AAC E A 340 38 13,691 92 93 0 7 4/8/22 Overlay - AC Structural 8/1/14 180 1 LOS ALAMITOS AVE MONTE ROYALE ST MANDEVILLE DR AAC E C 1,215 37 44,918 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 181 1 LOS CERROS ST LA CIENEGA ST SOUTH END AAC E C 230 33 10,124 100 0 0 0 1/1/20 Overlay - AC Fabric 1/1/20 182 1 LOS GATOS DR BUENA VISTA DR WEST END AAC E C 490 39 19,961 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 183 1 LOST COLT DR MAVERICK CIR STAGELINE DR AAC E A 905 38 30,716 81 50 46 4 5/11/20 Overlay - AC Structural 8/1/12 183 3 LOST COLT DR BEARGRASS CIR NELLIE GAIL RD AAC E A 600 40 18,912 90 63 23 14 5/11/20 Overlay - AC Structural 8/1/12 183 2 LOST COLT DR STAGELINE DR BEARGRASS CIR AAC E A 1,688 40 56,926 86 45 55 0 5/11/20 Overlay - AC Structural 8/1/12 184 1 LOST TRAIL DR RAPID FALLS RD DILLION RD AAC E A 1,880 38 69,669 85 54 46 0 4/8/22 Surface Treatment - Slurry Seal 6/1/18 185 1 LOUISA ST MOULTON PKWY WEST END AC E C 1,225 33 40,779 91 100 0 0 11/26/23 Surface Treatment - Slurry Seal 11/1/21 186 2 LUNA BONITA DR ENCANTO CT ALISO HILLS DR AAC E C 1,549 33 51,367 76 80 16 4 11/22/23 Overlay - AC Structural 7/1/11 186 1 LUNA BONITA DR LA SERRA ST ENCANTO CT AAC E C 662 33 21,636 84 97 0 3 11/22/23 Overlay - AC Structural 7/1/11 187 1 LUPITA ST LOUISA ST EVA ST AC E C 600 33 19,313 90 78 22 0 11/22/23 Surface Treatment - Slurry Seal 11/1/21 188 1 LUTON ST CAMBERWELL ST EAST END AAC E E 380 38 14,203 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 324 1 MACKENZIE CT MACKENZIE ST SOUTH END AC E D 85 60 5,045 84 17 83 0 4/8/22 Surface Treatment - Slurry Seal 6/1/18 189 1 MACKENZIE ST LA PAZ RD KNOTTY PINE RD AAC E D 888 33 30,465 89 88 0 12 4/8/22 Overlay - AC Fabric 8/1/14 189 3 MACKENZIE ST PIKE RD CALIFIA DR AAC E D 988 37 35,635 89 87 0 13 4/6/22 Surface Treatment - Slurry Seal 6/1/18 189 2 MACKENZIE ST KNOTTY PINE RD LA PAZ RD AAC E D 919 37 31,724 90 82 18 0 4/8/22 Overlay - AC Fabric 8/1/14 189 4 MACKENZIE ST CALIFIA DR COUTEAU DR AAC E D 1,542 37 54,141 88 98 2 0 4/6/22 Surface Treatment - Slurry Seal 6/1/18 190 1 MADEIRA DR PADUA DR SOUTH END AAC E D 290 33 12,919 82 53 47 0 4/6/22 Surface Treatment - Slurry Seal 6/1/18 191 1 MAGNOLIA CT FALLING LEAF DR SOUTH END AAC E A 555 33 20,100 93 92 0 8 4/7/22 Overlay - AC Structural 8/1/14 192 1 MANDEVILLE DR EAST END MOULTON PKWY AAC E C 1,685 38 61,758 80 76 8 16 11/26/23 Overlay - AC Structural 7/1/11 193 1 MAPLE VIEW DR LAUREL CREST DR WEST END AAC E A 580 36 21,015 94 91 0 9 4/7/22 Overlay - AC Structural 8/1/14 194 1 MARIN CT EL CAPITAN LN SOUTH END AAC E C 205 33 8,720 100 0 0 0 1/1/20 Overlay - AC Fabric 1/1/20 195 1 MARSALA BARBERA END AAC E F 967 39 35,878 93 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 196 1 MAVERICK CIR WESTRIDGE LN SOUTH END AAC E A 290 40 11,851 90 57 40 3 5/11/20 Overlay - AC Structural 8/1/12 197 2 MAWSON DR VELASQUEZ RD LAS BOLSAS ST AAC E D 1,063 33 33,399 93 93 0 7 4/6/22 Overlay - AC Fabric 8/1/14 197 1 MAWSON DR WILKES PL VELASQUEZ RD AAC E D 911 33 29,519 94 89 0 11 4/6/22 Overlay - AC Fabric 8/1/14 198 2 McINTYRE ST LA PAZ RD EVERGREEN RD AAC E D 1,500 37 54,783 93 68 32 0 5/11/20 Overlay - AC Structural 8/1/12 198 1 McINTYRE ST PIKE RD LA PAZ RD AAC E D 120 33 4,419 89 53 47 0 4/6/22 Surface Treatment - Slurry Seal 6/1/18 199 1 MEADOW CREST DR BRIDLEWOOD DR NORTH END AAC E A 625 36 23,545 89 55 45 0 5/11/20 Overlay - AC Structural 8/1/12 200 1 MENDOCINO AVE ALISO HILLS DR MENDOCINO CT AAC E C 130 36 4,250 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 201 1 MENDOCINO CT WEST END EAST OF MENDOCINO AVE AAC E C 1,080 37 40,736 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 202 1 MESSINA COLONNA END AAC E F 226 35 9,627 93 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 203 1 MIDDLERIDGE LN IRONWOOD DR WOODBLUFF RD AAC E A 235 33 5,944 95 100 0 0 4/7/22 Overlay - AC Structural 8/1/14 204 1 MILANO TARANTO MONTOVA AAC E F 198 35 7,593 91 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 22 1 MILL CREEK DR LAKE FOREST DR NORTH END OF BRIDGE AAC E F 1,064 40 36,606 100 88 0 12 4/7/22 Overlay - AC Structural 11/1/21 22 2 MILL CREEK DR SOUTH END OF BRIDGE RIDGE ROUTE DR AAC E F 2,703 40 106,442 100 84 5 11 4/7/22 Overlay - AC Structural 11/1/21 22 2 MILL CREEK DR SOUTH END OF BRIDGE RIDGE ROUTE DR AAC E F 2,703 40 106,442 100 84 5 11 4/7/22 Surface Treatment - Slurry Seal 11/1/21 206 1 MODINA FORMELLO END AAC E F 296 35 14,059 93 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 207 1 MODOC DR PADUA DR SOUTH END AAC E D 475 37 19,389 88 76 0 24 4/6/22 Surface Treatment - Slurry Seal 6/1/18 208 1 MONTE ROYALE ST ALAMEDA AVE LOS ALAMITOS AVE AAC E C 1,225 37 45,287 79 86 0 14 3/29/18 Overlay - AC Structural 7/1/11 209 1 MONTOVA MILANO END AAC E F 268 35 11,707 90 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 210 1 MOORE OAKS RD DEVONSHIRE RD NORTH END AAC E A 690 33 25,602 92 88 0 12 5/11/20 Overlay - AC Structural 8/1/12 211 1 MORRO CT TERRA BELLA AVE WEST END AAC E C 230 33 9,463 100 0 0 0 1/1/20 Overlay - AC Fabric 1/1/20 212 1 MT DIABLO RD GLEN CANYON DR SOUTH END AAC E B 1,300 36 46,307 89 76 24 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 213 2 MUSTANG DR FARRIER APPALOOSA PL AAC E B 1,372 39 51,031 92 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 213 1 MUSTANG DR NELLIE GAIL RD FARRIER AAC E B 648 39 23,933 92 100 0 0 3/16/22 Overlay - AC Structural 7/1/11 213 3 MUSTANG DR APPALOOSA PL BUCKSKIN DR AAC E B 1,417 39 53,199 94 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 214 1 NAPOLI PALERMO END AAC E F 495 35 18,566 93 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 215 1 NATAMA CT TERRA BELLA AVE WEST END AAC E C 210 33 8,952 100 0 0 0 1/1/20 Overlay - AC Fabric 1/1/20 25 1 NELLIE GAIL RD OSO PKWY DAPPLE GREY DR AAC E B 468 24 17,591 96 54 0 46 3/16/22 Crack Sealing - AC 2/12/08 25 2 NELLIE GAIL RD DAPPLE GREY DR BUCKBOARD LN AAC E B 470 38 18,795 93 75 0 25 3/16/22 Crack Sealing - AC 2/12/08 25 3 NELLIE GAIL RD BUCKBOARD LN CHAPARRAL PL AAC E B 1,284 38 47,504 97 100 0 0 3/16/22 Crack Sealing - AC 2/12/08 25 4 NELLIE GAIL RD CHAPARRAL PL HOUSTON TR AAC E B 593 38 22,731 95 100 0 0 3/16/22 Crack Sealing - AC 2/12/08 25 5 NELLIE GAIL RD PRAIRIESTONE DR GLEN CANYON DR AAC E B 714 38 27,037 96 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 25 6 NELLIE GAIL RD RED CORRAL RD GALLUP CIR AAC E B 854 38 30,993 97 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 25 7 NELLIE GAIL RD GLEN CANYON DR GALLUP CIR AAC E B 575 38 22,910 98 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 25 8 NELLIE GAIL RD HOUSTON TR MUSTANG DR AAC E B 492 38 17,973 96 100 0 0 3/16/22 Crack Sealing - AC 2/12/08

Page 8 of 11 ends
Page 499 of 570 ends

City of Laguna Hills, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, Name Order (A-Z)
Branch ID Sec ID Name From To Type Rank Zone L W Area PCI PCI Pct Climate PCI Pct Load PCI Pct Other Insp. Date Work Type Work Date 25 10 NELLIE GAIL RD OSO PKWY LANE MERGE AAC E A 983 20 19,855 83 83 14 3 12/4/23 Surface Treatment - Slurry Seal 6/1/18 25 11 NELLIE GAIL RD ROCKING HORSE LN EMPTY SADDLE DR AAC E A 611 38 22,929 75 35 64 1 12/1/23 Surface Treatment - Slurry Seal 6/1/18 25 12 NELLIE GAIL RD LOST COLT DR MOULTON PKWY AAC E A 575 19 9,886 79 61 39 0 12/4/23 Surface Treatment - Slurry Seal 6/1/18 25 13 NELLIE GAIL RD LOST COLT DR RED LODGE PL AAC E A 645 40 24,097 82 87 13 0 12/1/23 Surface Treatment - Slurry Seal 6/1/18 25 14 NELLIE GAIL RD RED LODGE PL ROCKING HORSE LN AAC E A 1,606 40 60,747 78 62 36 2 12/4/23 Overlay - AC Structural 7/1/17 25 15 NELLIE GAIL RD ROAD SPLIT EMPTY SADDLE DR AAC E A 321 38 11,759 80 61 39 0 12/4/23 Surface Treatment - Slurry Seal 6/1/18 25 16 NELLIE GAIL RD MOULTON PKWY LOST COLT DR AAC E A 603 20 10,300 81 61 39 0 12/4/23 Overlay - AC Structural 7/1/17 25 17 NELLIE GAIL RD LANE MERGE OSO PKWY AAC E A 968 20 21,182 78 62 28 10 12/4/23 Patching - AC Deep 8/1/14 25 18 NELLIE GAIL RD SHERIFF RD PRAIRIESTONE DR AAC E B 704 38 25,935 96 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 25 19 NELLIE GAIL RD BUCKLESTONE CT SHERIFF RD AAC E B 849 38 31,480 96 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 25 20 NELLIE GAIL RD BUCKLESTONE CT CABOT RD AAC E B 758 38 29,011 97 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 25 9 NELLIE GAIL RD MUSTANG DR BRIDLEWOOD DR AAC E B 409 38 15,544 95 54 46 0 3/16/22 Crack Sealing - AC 2/12/08 25 21 NELLIE GAIL RD NELLIE GAIL RD RED CORRAL AAC E B 665 38 24,728 96 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 216 1 NORTHRUP DR VELASQUEZ RD LAS BOLSAS ST AAC E D 1,400 33 46,888 90 100 0 0 4/6/22 Overlay - AC Fabric 8/1/14 217 1 NOTTINGHAM CT OSO PKWY DEVONSHIRE RD AAC E A 1,409 38 51,769 88 42 54 4 5/11/20 Overlay - AC Structural 8/1/12 217 2 NOTTINGHAM CT DEVONSHIRE RD BRADFORD LN AAC E A 899 38 32,249 88 76 19 5 5/11/20 Overlay - AC Structural 8/1/12 218 1 OAK HOLLOW RD ELM BANK DR NORTH END AAC E A 180 38 8,035 92 100 0 0 4/7/22 Overlay - AC Structural 8/1/14 219 1 OAK LEAF RD SPRUCE LN EVERGREEN RD AAC E D 860 37 33,484 77 37 63 0 11/26/23 Surface Treatment - Slurry Seal 6/1/18 220 2 ORELLANO WY ORELLANO WY END AAC E D 105 33 5,745 89 95 0 5 11/30/23 Overlay - AC Structural 7/1/14 220 1 ORELLANO WY PIKE RD NORTH END AAC E D 870 36 27,834 86 93 0 7 4/8/22 Overlay - AC Fabric 8/1/14 221 1 OROVILLE PL MT DIABLO RD SOUTH END AAC E B 605 37 24,466 93 66 34 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 222 1 OVERLAND DR CAJON DR WEST END AAC E D 570 36 20,437 90 100 0 0 4/8/22 Surface Treatment - Slurry Seal 6/1/18 223 1 PADOVA MARSALA END AAC E F 268 35 12,620 94 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 224 1 PADUA DR LA SUEN RD MACKENZIE ST AAC E D 885 36 31,702 88 60 40 0 4/6/22 Surface Treatment - Slurry Seal 6/1/18 225 1 PAIGE CIR GEORGIA SUE DR SOUTH END AAC E E 675 37 25,189 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 226 1 PALERMO SAN REMO DR TARANTO AAC E F 964 35 31,074 92 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 227 1 PASEO DE ALICIA ALICIA PKWY EAST END AAC E D 260 60 15,172 85 47 42 11 5/11/20 Overlay - AC Structural 8/1/12 228 1 PATRICIA ST LUPITA ST EAST END AC E C 420 37 15,727 85 100 0 0 11/22/23 Surface Treatment - Slurry Seal 11/1/21 229 1 PATTERSON PL LAUREL CREST DR MOORE OAKS RD AAC E A 360 37 12,715 91 63 37 0 5/11/20 Overlay - AC Structural 8/1/12 230 1 PECOS RD HITCHING RAIL RD WEST END AAC E B 1,220 36 43,924 92 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 29 1 PERALTA DR LA CADENA DR ALCALDE DR AAC E F 1,346 40 53,502 93 100 0 0 3/14/22 Surface Treatment - Slurry Seal 11/1/21 29 2 PERALTA DR ALCADE DR RIDGE ROUTE DR AAC E F 570 40 20,693 90 100 0 0 3/14/22 Surface Treatment - Slurry Seal 11/1/21 232 1 PESARO SAN REMO DR END AAC E F 850 42 32,684 93 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 233 1 PIKE RD LA SUEN RD MACKENZIE ST AAC E D 962 33 32,366 85 49 48 3 4/6/22 Surface Treatment - Slurry Seal 6/1/18 233 2 PIKE RD MACKENZIE ST GRISSOM RD AAC E D 1,157 33 37,217 87 39 53 8 5/11/20 Overlay - AC Structural 8/1/12 234 1 PINE NUT RD TREE TOP RD PASEO DE VALENCIA AAC E D 120 37 5,110 94 89 0 11 5/11/20 Overlay - AC Structural 8/1/12 235 1 PINE STRAP CIR HIDDEN TRAIL RD WEST END AAC E A 725 33 27,434 78 73 27 0 4/8/22 Overlay - AC Structural 8/1/14 236 1 PINEWOOD LN WEST END OAK LEAF RD AAC E D 235 33 10,244 81 47 38 15 11/26/23 Surface Treatment - Slurry Seal 6/1/18 237 1 PINTO CT LOST TRAIL DR EAST END AAC E A 170 33 8,226 82 100 0 0 4/8/22 Overlay - AC Structural 8/1/14 31 1 PLAZA POINTE DR AVENIDA DE LA CARLOTA SOUTH POINTE DR AAC E F 895 35 35,210 95 100 0 0 3/14/22 Surface Treatment - Slurry Seal 11/1/21 239 1 POINTSETTIA CT WOOD BROOD RD NORTH END AAC E A 150 33 7,038 95 87 0 13 4/7/22 Overlay - AC Structural 8/1/14 240 1 POKER FLATS PL NELLIE GAIL RD NORTH END AAC E B 310 40 12,786 98 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 241 1 PONCE CT LINDA VISTA DR SOUTH END AAC E C 205 33 9,101 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 242 1 PRAIRESTONE DR NELLIE GAIL RD HITCHING RAIL RD AAC E B 1,525 39 53,006 92 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 243 1 PRESIDO DR EL DORADO DR CALIFIA DR AAC E D 490 36 18,476 87 50 50 0 4/8/22 Surface Treatment - Slurry Seal 6/1/18 347 1 RAIN TREE RD GREEN HILLS LN EAST END AAC E A 646 33 25,006 95 93 0 7 4/7/22 Overlay - AC Structural 8/1/14 244 1 RAMONA ST YOLANDA ST ALICIA PKWY AC E C 475 31 15,789 92 100 0 0 11/22/23 Surface Treatment - Slurry Seal 11/1/21 245 1 RANGEWOOD RD GALLUP CIR EAST END AAC E B 1,290 36 46,135 94 100 0 0 3/16/22 Overlay - AC Structural 7/1/11 32 1 RAPID FALLS RD CABOT RD SUNDOWNER DR AAC E A 997 38 36,020 86 51 43 6 5/11/20 Overlay - AC Structural 8/1/12 32 2 RAPID FALLS RD SUNDOWNER DR LOST TRAIL DR AAC E A 1,055 38 38,956 81 45 49 6 5/11/20 Overlay - AC Structural 8/1/12 32 3 RAPID FALLS RD LOST TRAIL DR HIDDEN TRAIL RD AAC E A 1,292 38 47,436 83 43 50 7 5/11/20 Overlay - AC Structural 8/1/12 246 1 RED BARN CIR NELLIE GAIL RD NORTH END AAC E A 165 33 7,822 75 81 15 4 11/30/23 Surface Treatment - Slurry Seal 6/1/18 247 2 RED CORRAL RD HORSESHOE MUSTANG DR AAC E B 1,003 34 32,473 95 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 247 1 RED CORRAL RD NELLIE GAIL RD HORSESHOE AAC E B 1,370 34 44,839 94 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 248 1 RED LODGE PL NELLIE GAIL RD WEST END AAC E A 685 40 23,012 88 73 27 0 11/30/23 Surface Treatment - Slurry Seal 6/1/18 249 1 RICH SPRINGS CIR HITCHING RAIL RD WEST END AAC E B 175 44 8,147 95 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 250 1 RICKENBACKER RD PIKE RD LA PAZ RD AAC E D 135 33 4,867 86 45 55 0 4/6/22 Surface Treatment - Slurry Seal 6/1/18 251 1 RIMINI SAN REMO DR END AAC E F 250 35 10,483 94 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 252 1 RIO GRANDE AVE TALEGA AVE LA CIENEGA ST AAC E C 880 37 36,441 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 253 1 RITTEN HOUSE CIR ASHLAND DR NORTH END AAC E E 420 37 15,801 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 254 1 ROCKING HORSE LN NELLIE GAIL RD NORTH END AAC E A 970 39 32,425 81 58 40 2 11/26/23 Surface Treatment - Slurry Seal 6/1/18 255 1 ROCKRIDGE RD HIDDEN TRAIL RD EAST END AAC E A 995 36 35,695 86 27 64 9 4/8/22 Surface Treatment - Slurry Seal 6/1/18

Page 9 of 11 ends
Page 500 of 570 ends

City of Laguna Hills, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, Name Order (A-Z)
Branch ID Sec ID Name From To Type Rank Zone L W Area PCI PCI Pct Climate PCI Pct Load PCI Pct Other Insp. Date Work Type Work Date 256 1 RODEO CIR HIDDEN TRAIL RD EAST END AAC E A 415 38 15,843 82 66 31 3 4/8/22 Overlay - AC Structural 8/1/14 257 1 ROLLING HILLS RD WILLOW TREE LN WEST END AAC E A 515 33 17,948 90 100 0 0 4/7/22 Overlay - AC Structural 8/1/14 258 1 ROSA ST LUPITA ST NORTH END AC E C 560 36 19,984 89 100 0 0 11/26/23 Surface Treatment - Slurry Seal 11/1/21 259 1 SADDLEHORN LN BUCKSKIN LN SOUTH END AAC E B 315 39 13,308 80 94 0 6 12/4/23 Surface Treatment - Slurry Seal 11/1/21 260 1 SADDLEROCK PL BRIDLEWOOD DR WEST END AAC E B 540 37 20,465 95 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 261 1 SALFORD ST SOUTHPORT ST COSTEAU ST AAC E E 950 33 33,748 86 57 40 3 4/6/22 Overlay - AC Structural 7/1/11 262 1 SAN DONA GENOVA END AAC E F 312 35 14,257 93 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 263 1 SAN PEDRO AVE ANACAPA ST TALEGA AVE AAC E C 625 33 24,255 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 34 1 SAN REMO DR TERAMO SANTA VITTORIA DR. AAC E F 1,100 32 34,543 89 98 2 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 34 2 SAN REMO DR PESARO TERAMO AAC E F 612 32 19,837 92 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 34 3 SAN REMO DR PALERMO SANTA MARIA AVE AC E F 539 32 16,095 88 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 34 4 SAN REMO DR PALERMO PESARO AAC E F 482 32 15,198 86 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 265 1 SANDIA CT TERRA BELLA AVE NORTH END AAC E C 425 37 18,023 100 0 0 0 1/1/20 Overlay - AC Fabric 1/1/20 266 1 SANDRIDGE CIR WESTRIDGE LN EAST END AAC E A 135 46 6,755 83 65 28 7 4/8/22 Overlay - AC Structural 8/1/14 267 1 SANTA ROSA AVE MANDEVILLE DR SUNDANCE AVE AAC E C 690 37 25,787 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 269 1 SARA LN PAIGE CIR EAST END AAC E E 650 38 24,235 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 270 2 SARITA DR LA HABRA CT ALISAL LN AAC E C 445 33 13,947 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 270 1 SARITA DR LINDA VISTA DR LA HABRA CT AC E C 222 33 10,570 91 98 0 2 11/30/23 New Construction - Initial 1/1/80 271 1 SAUSALITO ST ALAMEDA AVE EAST END AAC E C 1,325 35 45,077 81 91 0 9 11/22/23 Overlay - AC Fabric 1/1/20 272 1 SAVONA BARBERA END AAC E E 284 35 14,601 93 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 273 1 SHENANDOAH DR HIDDEN TRAIL RD SOUTH END AAC E A 550 41 22,289 87 49 44 7 11/26/23 Surface Treatment - Slurry Seal 6/1/18 274 1 SHERIFF RD NELLIE GAIL RD EAST END AAC E B 775 36 30,529 93 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 275 1 SIERRA BONITA DR LA CIENEGA ST ALISO HILLS DR AAC E C 140 42 8,516 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 276 1 SILVER SADDLE LN BUCKSKIN DR SOUTH END AAC E B 315 39 13,194 82 55 43 2 11/26/23 Surface Treatment - Slurry Seal 11/1/21 277 1 SOLANO CT ALAMEDA AVE EAST END AAC E C 245 40 10,152 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 278 1 SORESINA TERAMO ADAMO AAC E F 655 35 21,921 93 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 279 1 SORRELL PL BUCKSKIN DR EAST END AAC E B 280 34 11,593 88 100 0 0 11/26/23 Surface Treatment - Slurry Seal 11/1/21 35 1 SOUTH POINTE DR PLAZA POINTE DR END AAC E F 487 40 21,196 97 100 0 0 3/14/22 Surface Treatment - Slurry Seal 11/1/21 35 2 SOUTH POINTE DR PLAZA POINTE DR PERALTA RD AAC E F 871 40 33,739 95 100 0 0 3/14/22 Surface Treatment - Slurry Seal 11/1/21 281 1 SOUTHAMPTON CT CREEKVIEW DR NORTH END AAC E E 75 61 4,554 76 100 0 0 12/4/23 Overlay - AC Structural 6/1/18 282 1 SOUTHPORT CT SOUTHPORT ST NORTH END AAC E E 140 45 6,625 91 94 0 6 4/6/22 Overlay - AC Structural 7/1/11 283 1 SOUTHPORT ST WOOLWICH ST EAST END AAC E E 1,570 34 53,832 79 71 28 1 4/6/22 Overlay - AC Structural 7/1/11 284 1 SPOTTED PONY LN EAST END WEST END AAC E A 955 39 30,432 84 87 13 0 11/30/23 Surface Treatment - Slurry Seal 6/1/18 285 1 SPRUCE LN WEST END OAK LEAF RD AAC E D 330 42 13,199 81 58 42 0 12/1/23 Surface Treatment - Slurry Seal 6/1/18 286 1 SPUR BRANCH LN HITCHING RAIL RD EAST END AAC E B 760 36 28,184 94 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 287 1 STAGE COACH DR MACKENZIE ST EL DORADO DR AAC E D 625 37 24,100 85 57 40 3 4/8/22 Surface Treatment - Slurry Seal 6/1/18 288 1 STAGELINE DR LOST COACH DR HIDDEN TRAIL RD AAC E A 1,820 38 68,144 90 97 0 3 4/8/22 Overlay - AC Structural 8/1/14 289 1 STAGEWOOD CT STAGELINE DR NORTH END AAC E A 355 38 14,585 91 100 0 0 4/8/22 Overlay - AC Structural 8/1/14 290 1 STENSON PL BUCKSBOARD LN NORTH END AAC E B 625 39 22,856 85 60 40 0 11/30/23 Surface Treatment - Slurry Seal 11/1/21 291 1 STOCKPORT ST WILKES PL FIRE GATE AAC E E 635 36 22,465 100 0 0 0 1/1/20 Overlay - AC Fabric 1/1/20 291 2 STOCKPORT ST PASEO DE VALENCIA FIRE GATE AAC E E 570 35 19,251 100 0 0 0 1/1/20 Overlay - AC Fabric 1/1/20 292 1 STRATFORD PL NOTTINGHAM PL NORTH END AAC E A 265 40 10,707 95 93 0 7 4/7/22 Overlay - AC Structural 8/1/14 293 1 SUNBURST AVE PASEO DE VALENCIA LARGO DR AAC E C 120 37 4,222 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 294 1 SUNDANCE AVE SANTA ROSA AVE LOS ALAMITOS AVE AAC E C 420 37 16,235 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 295 1 SUNDOWNER DR RAPID FALLS RD NORTH END AAC E A 310 38 11,253 87 41 25 34 5/11/20 Overlay - AC Structural 8/1/12 296 3 SUNSET PL (E & W LOOP) SUNSET PL SUNSET PL EAST AAC E E 853 34 30,690 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 296 2 SUNSET PL (E & W LOOP) SUNSET PL SUNSET PL WEST AAC E E 768 34 26,414 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 296 1 SUNSET PL (E & W LOOP) BECKENHAM ST SUNSET PL AAC E E 172 34 4,964 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 297 1 SUTTER DR EL DORADO DR WEST END AAC E D 600 36 22,524 83 37 63 0 4/8/22 Surface Treatment - Slurry Seal 6/1/18 298 1 SYCAMORE LN McINTYRE ST WEST END AAC E D 110 27 2,739 87 91 0 9 12/1/23 Surface Treatment - Slurry Seal 6/1/18 299 1 TALEGA AVE SAN PEDRO AVE ALAMEDA AVE AAC E C 875 37 30,496 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 300 1 TARANTO VENISIA SAN REMO DR AAC E F 902 35 19,565 93 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 300 2 TARANTO TREVISO VENISIA AAC E F 803 35 27,905 92 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 301 1 TASMAN RD ERICSON WY VELASQUEZ RD AAC E D 985 33 31,308 88 94 0 6 4/6/22 Overlay - AC Fabric 8/1/14 302 1 TERAMO SAN REMO MARSALA AAC E F 747 39 27,343 92 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 303 1 TERNI SORESINA END AAC E F 330 35 12,025 92 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 304 2 TERRA BELLA AVE MORRO CT SOUTH END AAC E C 883 38 33,426 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 304 1 TERRA BELLA AVE ALISO HILLS DR MORRO CT AAC E C 1,204 38 42,065 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 38 1 TERRA DR LA CADENA DR END AAC E F 158 40 8,474 92 100 0 0 3/14/22 Surface Treatment - Slurry Seal 11/1/21 306 1 TOCALOMA CT ALAMEDA AVE EAST END AAC E C 575 29 17,375 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 307 1 TOLUCA CT LINDA FLORA ST NORTH END AAC E C 410 37 15,449 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 308 1 TOMBSTONE RD OSO PKWY HITCHING RAIL RD AAC E B 315 20 6,913 91 45 55 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21

Page 10 of 11 ends
Page 501 of 570 ends

City of Laguna Hills, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, Name Order (A-Z)
Branch ID Sec ID Name From To Type Rank Zone L W Area PCI PCI Pct Climate PCI Pct Load PCI Pct Other Insp. Date Work Type Work Date 309 1 TORINO TARANTO TORINO AAC E F 252 35 7,054 92 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 309 2 TORINO WEST END EAST END AAC E F 298 35 20,018 93 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 310 1 TREE TOP RD FIR LN EAST END AAC E D 930 37 35,023 90 55 21 24 5/11/20 Overlay - AC Structural 8/1/12 311 1 TREVISO NAPOLI END AAC E F 425 35 10,508 94 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 312 1 VALERIE ST BENTLEY LN COSTEAU DR AAC E D 225 36 8,627 81 36 64 0 11/30/23 Overlay - AC Structural 7/1/11 313 2 VELASQUEZ RD MAWSON DR EARHART AAC E D 288 33 9,661 77 80 20 0 11/30/23 Patching - AC Deep 8/1/14 313 3 VELASQUEZ RD GRISSOM RD PASEO DE VALENCIA AC E D 145 33 5,469 79 63 31 6 11/30/23 Patching - AC Deep 8/1/14 313 5 VELASQUEZ RD EARHART NORTHRUP AAC E D 276 33 9,411 79 73 21 6 11/30/23 Patching - AC Deep 8/1/14 313 4 VELASQUEZ RD TASMAN RD COSTEAU DR AAC E D 260 33 8,983 94 100 0 0 4/6/22 Overlay - AC Fabric 8/1/14 313 1 VELASQUEZ RD TASMAN RD NORTHRUP DR AAC E D 610 33 20,363 89 97 0 3 4/6/22 Overlay - AC Fabric 8/1/14 314 1 VENISIA TARANTO END AAC E F 287 35 11,383 94 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 39 1 VERDUGO DR LA CADENA DR EL PACIFICO DR AAC E F 587 36 23,434 92 100 0 0 3/14/22 Surface Treatment - Slurry Seal 11/1/21 39 2 VERDUGO DR ALCALDE DR EL PACIFICO DR AAC E F 560 36 22,708 93 100 0 0 3/14/22 Surface Treatment - Slurry Seal 11/1/21 316 1 VERONA TARANTO END AAC E F 328 35 14,216 95 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 317 2 VESPUCCI RD LAS BOLSAS ST VELASQUEZ RD AAC E D 1,055 33 34,292 92 84 0 16 4/6/22 Overlay - AC Fabric 8/1/14 317 1 VESPUCCI RD CHAMPLAIN RD DE SALLE ST AAC E D 160 33 6,456 92 96 0 4 5/11/20 Overlay - AC Structural 8/1/12 318 1 VIA BALBOA CALLE CARMEL END AAC E E 300 33 11,112 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 319 1 VIA LOMAS MOULTON PKWY ALICIA PKWY AC E E 2,600 37 95,841 67 49 51 0 3/14/22 New Construction - Initial 1/1/80 40 1 VISTA GRANDE DR PERALTA DR END AAC E F 443 40 19,084 91 98 2 0 3/14/22 Surface Treatment - Slurry Seal 11/1/21 321 1 VISTA VIEJO CITY LIMIT DEVONSHIRE RD AAC E A 1,530 39 53,056 86 23 77 0 5/11/20 Overlay - AC Structural 8/1/12 322 1 WAGON WHEEL DR HIDDEN TRAIL RD EAST END AAC E A 785 36 26,820 81 64 36 0 11/30/23 Surface Treatment - Slurry Seal 6/1/18 323 1 WATERWHEEL PL HITCHING RAIL RD EAST END AAC E B 390 38 15,558 91 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 325 1 WELLS FARGO DR CAJON DR MACKENZIE ST AAC E D 625 37 23,911 87 50 50 0 4/8/22 Surface Treatment - Slurry Seal 6/1/18 326 1 WESTRIDGE LN LOST COLT DR SANDRIDGE CIR AAC E A 2,031 38 75,320 86 59 41 0 5/11/20 Overlay - AC Structural 8/1/12 326 2 WESTRIDGE LN SANDRIDGE CIR MAVERICK CIR AAC E A 655 38 24,632 85 42 44 14 5/11/20 Overlay - AC Structural 8/1/12 327 1 WEYBURN DR ASHLAND DR EAST END AAC E E 770 37 27,632 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 328 1 WHITE ALDER LN McINTYRE ST OAK LEAF RD AAC E D 435 37 16,224 83 80 0 20 11/26/23 Surface Treatment - Slurry Seal 6/1/18 329 1 WHITE OAKS DR LAUREL CREST DR SOUTH END AAC E A 950 33 35,751 91 100 0 0 4/7/22 Overlay - AC Structural 8/1/14 330 1 WILD VIEW TER DAPPLE GREY DR SOUTH END AAC E B 410 38 16,974 92 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 331 2 WILKES PL GRISSOM RD ALICIA PKWY AAC E D 1,125 33 37,401 94 100 0 0 4/6/22 Overlay - AC Fabric 8/1/14 331 1 WILKES PL ALICIA PKWY NW to FIRE GATE AAC E E 1,560 36 56,464 100 0 0 0 1/1/20 Overlay - AC Fabric 1/1/20 332 1 WILLOW TREE LN FALLING LEAF DR ROLLING HILLS RD AAC E A 275 33 11,023 95 100 0 0 4/7/22 Overlay - AC Structural 8/1/14 334 2 WOOD BLUFF RD ELDERBROOK LN FALLING LEAF DR AAC E A 1,902 37 70,544 94 94 0 6 4/7/22 Overlay - AC Structural 8/1/14 334 1 WOOD BLUFF RD VISTA VIEJO ELDERBROOK LN AAC E A 1,142 37 40,496 92 67 33 0 5/11/20 Overlay - AC Structural 8/1/12 335 1 WOOD BROOK RD LAUREL CREST WEST END AAC E A 465 33 17,329 93 73 0 27 4/7/22 Overlay - AC Structural 8/1/14 336 1 WOODCREEK DR SW to CREEKVIEW DR LOS ALISOS BLVD AAC E E 245 33 8,798 85 85 15 0 11/30/23 Overlay - AC Structural 6/1/18 337 1 WOOLWICH CT WOOLWICH ST WEST END AAC E E 150 45 6,916 83 100 0 0 4/6/22 Overlay - AC Structural 7/1/11 338 2 WOOLWICH ST WOOLWICH CT WILKES PL AAC E E 1,030 32 33,087 92 100 0 0 4/6/22 Overlay - AC Structural 7/1/11 338 1 WOOLWICH ST COSTEAU ST WOOLWICH CT AAC E E 445 33 14,821 82 100 0 0 4/6/22 Overlay - AC Structural 7/1/11 339 1 YOLANDA ST EVA ST RAMONA ST AC E C 800 33 25,680 88 79 21 0 11/30/23 Surface Treatment - Slurry Seal 11/1/21 350 1 YORK CIR WILKES PL WEST END AAC E E 605 33 21,669 82 47 51 2 4/6/22 Overlay - AC Structural 7/1/11 341 1 ZUMAYA CT WEST END BUENA VISTA DR AAC E C 470 37 17,010 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20

63.7 12,189,130

Page 11 of 11 ends
Page 502 of 570 ends

City of Laguna Hills, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, PCI Order (0-100)
Branch ID Sec ID Name From To Type Rank Zone L W Area PCI PCI Pct Climate PCI Pct Load PCI Pct Other Insp. Date Work Type Work Date Arterials / Collectors (MPAH)
28 27 PASEO DE VALENCIA HEALTH CENTER DR CALLE DE LA MAGDALENA AAC B E 1,088 40 43,154 44 28 69 3 12/29/23 Overlay - AC Structural 7/1/08 28 31 PASEO DE VALENCIA CALLE DE LA MAGDALENA CALLE DE LA PLATA AAC B E 697 40 29,659 48 47 46 7 12/29/23 Overlay - AC Structural 7/1/08 28 32 PASEO DE VALENCIA LAGUNA HILLS DR BECKENHAM ST AAC B E 1,559 34 63,532 49 66 33 1 12/29/23 Overlay - AC Structural 7/1/08 28 29 PASEO DE VALENCIA LOS ALISOS BLVD HEALTH CENTER DR AAC B E 1,733 45 69,166 52 59 33 8 12/29/23 Overlay - AC Structural 7/1/08 6 12 AVENIDA DE LA CARLOTA PASEO DE VALENCIA RIDGE ROUTE DR AAC B F 3,049 38 87,210 52 53 40 7 12/29/23 Surface Course - AC 7/1/04 28 33 PASEO DE VALENCIA BECKENHAM ST KENNINGTON DR AAC B E 570 34 23,336 54 60 35 5 12/29/23 Overlay - AC Structural 7/1/08 28 3 PASEO DE VALENCIA CALLE DE LA PLATA CALLE DE LA MAGDALENA AAC B E 742 36 30,117 55 59 38 3 12/29/23 Overlay - AC Structural 7/1/08 6 3 AVENIDA DE LA CARLOTA LAKE FOREST DR PLAZA POINTE DR AAC B F 689 30 17,519 55 48 37 15 12/28/23 Surface Course - AC 7/1/04 28 1 PASEO DE VALENCIA CALLE DE LA MAGDALENA HEALTH CENTER DR AAC B E 1,139 34 45,817 56 35 61 4 12/29/23 Overlay - AC Structural 7/1/08 28 2 PASEO DE VALENCIA EL TORO RD CALLE DE LA PLATA AAC B E 1,040 40 45,446 56 46 30 24 12/28/23 Overlay - AC Structural 7/1/08 18 17 LA PAZ RD CABOT RD MC INTYRE ST AAC B D 836 30 30,149 56 21 74 5 12/17/23 Overlay - AC Structural 7/1/08 28 10 PASEO DE VALENCIA KENNINGTON DR LOS ALISOS BLVD AAC B E 1,233 35 50,394 56 65 31 4 12/29/23 Overlay - AC Structural 7/1/08 6 2 AVENIDA DE LA CARLOTA RIDGE ROUTE DR PASEO DE VALENCIA AAC B F 3,051 38 88,207 57 68 23 9 12/28/23 Surface Course - AC 7/1/04 18 15 LA PAZ RD MC INTYRE ST CHAMPLAIN RD AAC B D 1,015 30 33,323 59 38 58 4 12/17/23 Overlay - AC Structural 7/1/08 4 14 ALICIA PKWY HON AVE COSTEAU ST AAC B E 911 42 43,886 59 50 50 0 12/17/23 Surface Course - AC 7/1/04 28 34 PASEO DE VALENCIA LOS ALISOS BLVD KENNINGTON DR AAC B E 1,287 34 53,698 59 73 19 8 12/29/23 Overlay - AC Structural 7/1/08 23 16 MOULTON PKWY OSO PKWY LA PAZ RD AAC B B 1,384 36 61,005 60 56 44 0 12/28/23 Surface Course - AC 7/1/99 6 14 AVENIDA DE LA CARLOTA PLAZA POINTE DR LAKE FOREST DR AAC B F 585 60 19,070 61 66 29 5 12/28/23 Surface Course - AC 7/1/04 18 14 LA PAZ RD PASEO DE VALENCIA ALISO HILLS DR AAC B C 2,068 40 80,657 61 62 29 9 12/6/23 Overlay - AC Structural 7/1/08 28 7 PASEO DE VALENCIA BECKENHAM ST LAGUNA HILLS DR AAC B E 1,554 34 60,304 62 50 45 5 12/29/23 Overlay - AC Structural 7/1/08 27 12 OSO PKWY TOMBSTONE RD CABOT RD AAC B B 365 54 23,851 62 80 0 20 12/28/23 Surface Course - AC 7/1/99 6 11 AVENIDA DE LA CARLOTA RIDGE ROUTE DR COMMERCE CENTER AAC B F 792 29 23,202 62 65 26 9 12/29/23 Surface Course - AC 7/1/04 23 9 MOULTON PKWY VIA LOMAS INDIAN HILL LN AAC B E 1,037 42 45,239 62 39 51 10 12/17/23 Overlay - AC Structural 4/1/10 28 30 PASEO DE VALENCIA CALLE DE LA PLATA EL TORO RD AAC B E 1,008 40 47,444 63 45 55 0 12/29/23 Overlay - AC Structural 7/1/08 18 13 LA PAZ RD MOULTON PKWY W. CITY LIMITS AAC B C 840 50 57,142 63 50 48 2 12/20/23 Overlay - AC Structural 7/1/08 23 27 MOULTON PKWY INDIAN HILL LN VIA LOMAS AAC B E 1,010 41 54,610 63 74 21 5 12/17/23 Overlay - AC Structural 4/1/10 6 5 AVENIDA DE LA CARLOTA PLAZA POINTE DR COMMERCE CENTER AAC B F 2,408 30 66,411 64 78 16 6 12/20/23 Surface Course - AC 7/1/04 27 15 OSO PKWY BRIDLEWOOD DR TOMBSTONE RD AAC B B 2,225 42 96,729 64 79 14 7 12/13/23 Overlay - AC Structural 7/1/08 6 13 AVENIDA DE LA CARLOTA COMMERCE CENTER PLAZA POINTE DR AAC B F 2,453 29 73,670 65 80 15 5 12/20/23 Surface Course - AC 7/1/04 4 15 ALICIA PKWY COSTEAU ST WILKES PL AAC B E 1,714 42 73,727 65 36 64 0 12/17/23 Surface Course - AC 7/1/04 8 13 CABOT RD N. CITY LIMITS RAPID FALLS RD AAC B A 174 40 6,089 65 99 0 1 12/28/23 Overlay - AC Structural 7/10/17 28 8 PASEO DE VALENCIA KENNINGTON DR BECKENHAM ST AAC B E 571 35 23,302 65 37 48 15 12/29/23 Overlay - AC Structural 7/1/08 23 26 MOULTON PKWY INDIAN HILL LN SOUTH END OF BRIDGE AAC B E 857 40 34,170 65 76 18 6 12/13/23 Overlay - AC Structural 4/1/10 28 16 PASEO DE VALENCIA SUNBURST AVE ALICIA PKWY AAC B D 1,187 38 57,590 65 66 34 0 12/13/23 Overlay - AC Structural 7/1/08 23 22 MOULTON PKWY ALICIA PKWY MANDEVILLE DR AAC B C 1,566 48 66,270 65 63 30 7 12/17/23 Surface Course - AC 7/1/99 18 11 LA PAZ RD ALISO HILLS DR GALLUP CIR AAC B C 930 40 36,465 65 83 13 4 12/13/23 Overlay - AC Structural 7/1/08 23 28 MOULTON PKWY LAGUNA HILLS DR NORTH END OF BRIDGE AAC B E 611 33 36,589 65 92 8 0 12/20/23 Overlay - AC Structural 4/1/10 18 8 LA PAZ RD GALLUP CIR ALAMEDA AVE AAC B C 3,234 40 129,940 66 67 29 4 12/13/23 Overlay - AC Structural 7/1/08 28 9 PASEO DE VALENCIA HEALTH CENTER DR LOS ALISOS BLVD AAC B E 1,667 45 71,789 66 50 35 15 12/29/23 Overlay - AC Structural 7/1/08 18 18 LA PAZ RD CHAMPLAIN RD PASEO DE VALENCIA AAC B D 962 30 30,684 66 46 31 23 12/17/23 Overlay - AC Structural 7/1/08 6 1 AVENIDA DE LA CARLOTA EL TORO RD PVMT CHNGE 650' E/ OAKBROOK VILLAGE AAC B E 3,365 30 84,199 66 55 32 13 1/3/24 Surface Course - AC 7/1/01 27 13 OSO PKWY NELLIE GAIL RD NOTTINGHAM RD AAC B B 1,176 43 49,492 66 57 43 0 12/13/23 Overlay - AC Structural 7/1/08 28 17 PASEO DE VALENCIA HILLARY LN SUNBURST AVE AAC B D 465 38 17,685 66 77 17 6 12/13/23 Overlay - AC Structural 7/1/08 23 2 MOULTON PKWY ALISO CREEK BRIDGE INDIAN HILL LN AAC B E 681 42 30,942 67 88 0 12 12/13/23 Overlay - AC Structural 4/1/10 6 4 AVENIDA DE LA CARLOTA COMMERCE CENTER RIDGE ROUTE DR AAC B F 794 30 21,860 67 67 5 28 12/28/23 Surface Course - AC 7/1/04 27 1 OSO PKWY NOTTINGHAM CT BRIDLEWOOD DR AAC B B 2,153 42 92,074 67 30 39 31 12/13/23 Overlay - AC Structural 7/1/08 18 2 LA PAZ RD W. CITY LIMITS MOULTON PKWY AAC B C 809 50 61,186 68 50 44 6 12/20/23 Overlay - AC Structural 7/1/08 4 12 ALICIA PKWY PASEO DE VALENCIA VIA LOMAS AAC B E 1,700 42 75,946 68 30 70 0 12/17/23 Surface Course - AC 7/1/04 6 7 AVENIDA DE LA CARLOTA PASEO DE VALENCIA EL TORO RD AAC B F 656 40 38,693 68 63 37 0 12/28/23 Overlay - AC Structural 5/29/12 18 12 LA PAZ RD ALAMEDA AVE MOULTON PKWY AAC B C 2,180 40 95,681 69 94 5 1 12/13/23 Overlay - AC Structural 7/1/08 23 3 MOULTON PKWY LAGUNA HILLS DR INDIAN CIRCLE LN AAC B E 1,821 40 82,325 69 73 27 0 12/13/23 Overlay - AC Structural 4/1/10 18 3 LA PAZ RD ALISO HILLS DR PASEO DE VALENCIA AAC B C 2,062 40 82,478 69 83 12 5 12/13/23 Overlay - AC Structural 7/1/08 18 1 LA PAZ RD MOULTON PKWY ALAMEDA AVE AAC B C 2,228 40 86,293 69 68 25 7 12/13/23 Overlay - AC Structural 7/1/08 23 10 MOULTON PKWY NORTH END OF BRIDGE LAGUNA HILLS DR AAC B E 721 42 37,272 69 99 0 1 12/20/23 Overlay - AC Structural 4/1/10 23 25 MOULTON PKWY LA PAZ RD OSO PKWY AAC B B 1,391 52 62,488 69 44 47 9 12/20/23 Surface Course - AC 7/1/99 28 22 PASEO DE VALENCIA ERICSON WY VELASQUEZ RD AAC B D 1,063 38 43,233 69 51 48 1 12/13/23 Surface Course - AC 7/1/04 23 4 MOULTON PKWY RIDGE ROUTE DR SANTA MARIA AVE AAC B F 1,361 48 60,721 70 96 3 1 12/20/23 Overlay - AC Structural 7/1/11 4 5 ALICIA PKWY VIA LOMAS ALISO HILLS DR (N) AAC B E 843 42 37,591 70 27 73 0 12/17/23 Surface Course - AC 7/1/04 18 10 LA PAZ RD ALAMEDA AVE GALLUP CIR AAC B C 3,188 40 125,057 70 78 11 11 12/7/23 Overlay - AC Structural 7/1/08 23 6 MOULTON PKWY MANDEVILLE DR LA PAZ RD AAC B C 1,619 48 79,329 70 50 50 0 12/17/23 Surface Course - AC 7/1/99 4 13 ALICIA PKWY PASEO DE VALENCIA WILKES PL AAC B E 1,728 42 74,291 70 49 51 0 12/17/23 Surface Course - AC 7/1/04

Page 1 of 11 ends
Page 503 of 570 ends

City of Laguna Hills, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, PCI Order (0-100)
Branch ID Sec ID Name From To Type Rank Zone L W Area PCI PCI Pct Climate PCI Pct Load PCI Pct Other Insp. Date Work Type Work Date 20 1 LAKE FOREST DR W CITY LIMITS SANTA VITTORIA DR AAC B F 417 42 20,767 70 100 0 0 12/7/23 Surface Course - AC 7/1/00 18 7 LA PAZ RD PASEO DE VALENCIA CHAMPLAIN RD AAC B D 944 30 29,282 70 69 20 11 12/17/23 Overlay - AC Structural 7/1/08 27 4 OSO PKWY WEST HAVEN DR NELLIE GAIL RD AAC B B 2,357 43 100,405 70 57 28 15 12/13/23 Overlay - AC Structural 7/1/08 20 13 LAKE FOREST DR MOULTON PKWY TRITON WY AAC B F 843 48 38,443 71 99 0 1 12/7/23 Surface Course - AC 7/1/00 28 24 PASEO DE VALENCIA ALICIA PKWY LAGUNA HILLS DR AAC B E 1,515 52 72,633 71 56 17 27 12/28/23 Overlay - AC Structural 7/1/08 18 4 LA PAZ RD CHAMPLAIN RD MC INTYRE ST AAC B D 979 30 32,034 71 90 0 10 12/7/23 Overlay - AC Structural 7/1/08 4 7 ALICIA PKWY WILKES PL PASEO DE VALENCIA AAC B E 1,722 42 75,786 71 50 48 2 12/17/23 Surface Course - AC 7/1/04 28 5 PASEO DE VALENCIA LAGUNA HILLS DR ALICIA PKWY AAC B E 1,605 52 73,824 71 93 6 1 12/28/23 Overlay - AC Structural 7/1/08 4 1 ALICIA PKWY ALISO HILLS DR MOULTON PKWY AAC B C 1,354 42 67,438 71 49 51 0 12/17/23 Overlay - AC Structural 7/10/17 20 12 LAKE FOREST DR TRITON WY MILL CREEK DR AAC B F 589 38 29,786 72 99 0 1 12/7/23 Surface Course - AC 7/1/00 20 14 LAKE FOREST DR MOULTON PKWY DEL LAGO DR AAC B F 954 46 50,064 72 99 0 1 12/20/23 Surface Course - AC 7/1/04 20 2 LAKE FOREST DR AVENIDA DE LA CARLOTA DEL LAGO DR AAC B F 914 45 56,517 72 43 57 0 12/28/23 Surface Course - AC 7/1/04 23 20 MOULTON PKWY LA PAZ RD MANDEVILLE DR AAC B C 1,598 48 67,390 72 68 21 11 12/20/23 Surface Course - AC 7/1/99 27 8 OSO PKWY BRIDLEWOOD DR NOTTINGHAM CT AAC B B 2,116 42 88,131 72 50 39 11 12/13/23 Overlay - AC Structural 7/1/08 20 9 LAKE FOREST DR DEL LAGO DR AVENIDA DE LA CARLOTA AAC B F 918 50 44,074 72 100 0 0 12/28/23 Surface Course - AC 7/1/04 4 3 ALICIA PKWY COSTEAU ST HON AVE AAC B E 925 42 44,897 72 49 51 0 12/17/23 Surface Course - AC 7/1/04 23 21 MOULTON PKWY VIA LOMAS ALICIA PKWY AAC B C 795 49 41,312 73 61 39 0 12/17/23 Surface Course - AC 7/1/99 28 21 PASEO DE VALENCIA VELASQUEZ RD HILLARY LN AAC B D 988 38 37,611 73 60 19 21 12/13/23 Overlay - AC Structural 7/1/08 4 11 ALICIA PKWY ALISO HILLS DR VIA LOMAS AAC B E 832 42 36,761 73 38 62 0 12/20/23 Surface Course - AC 7/1/04 6 8 AVENIDA DE LA CARLOTA EL TORO RD PASEO DE VALENCIA AAC B F 642 40 21,371 73 41 47 12 12/28/23 Overlay - AC Structural 5/29/12 18 6 LA PAZ RD MC INTYRE ST CABOT RD AAC B D 877 30 29,067 73 65 35 0 12/17/23 Overlay - AC Structural 7/1/08 28 15 PASEO DE VALENCIA VELASQUEZ RD ERICSON WY AAC B D 1,092 38 42,317 73 98 0 2 12/13/23 Surface Course - AC 7/1/04 6 10 AVENIDA DE LA CARLOTA PVMT CHNGE 650' E/ OAKBROOK VILLAGE EL TORO RD AAC B E 3,365 30 97,583 73 58 34 8 1/3/24 Surface Course - AC 7/1/01 6 9 AVENIDA DE LA CARLOTA LOS ALISOS BLVD PVMT CHNGE 650' E/ OAKBROOK VILLAGE AAC B E 505 40 44,128 73 100 0 0 12/29/23 Surface Course - AC 7/1/01 20 7 LAKE FOREST DR DEL LAGO DR MOULTON PKWY AAC B F 949 44 54,524 74 98 0 2 12/20/23 Surface Course - AC 7/1/04 27 9 OSO PKWY WEST HAVEN DR MOULTON PKWY AAC B B 746 43 38,708 74 65 35 0 12/20/23 Overlay - AC Structural 7/1/08 18 9 LA PAZ RD GALLUP CIR ALISO HILLS DR AAC B C 910 40 35,620 74 90 10 0 12/13/23 Overlay - AC Structural 7/1/08 27 10 OSO PKWY NELLIE GAIL RD WEST HAVEN DR AAC B B 2,388 43 100,126 74 68 20 12 12/13/23 Overlay - AC Structural 7/1/08 27 6 OSO PKWY CABOT RD TOMBSTONE RD AAC B B 410 54 19,462 74 68 8 24 12/28/23 Surface Course - AC 7/1/99 19 3 LAGUNA HILLS DR MOULTON PKWY EAST END OF BRIDGE AAC B E 414 33 14,757 74 45 25 30 12/7/23 Overlay - AC Structural 6/1/10 23 12 MOULTON PKWY EL PACIFICO DR LAKE FOREST DR AAC B F 1,570 50 73,673 74 82 18 0 12/17/23 Overlay - AC Structural 7/1/06 28 23 PASEO DE VALENCIA ERICSON WY LA PAZ RD AAC B D 1,032 38 41,586 74 81 0 19 12/17/23 Surface Course - AC 7/1/04 23 18 MOULTON PKWY EL PACIFICO DR RIDGE ROUTE DR AAC B F 1,539 50 70,352 74 89 0 11 12/20/23 Overlay - AC Structural 7/1/11 4 6 ALICIA PKWY WILKES PL COSTEAU ST AAC B E 1,744 42 73,253 75 35 59 6 12/17/23 Surface Course - AC 7/1/04 27 16 OSO PKWY TOMBSTONE RD BRIDLEWOOD DR AAC B B 2,225 42 96,808 75 60 24 16 12/13/23 Overlay - AC Structural 7/1/08 28 19 PASEO DE VALENCIA ALICIA PKWY SUNBURST AVE AAC B D 1,271 38 49,506 75 87 6 7 12/17/23 Overlay - AC Structural 7/1/08 20 4 LAKE FOREST DR MILL CREEK DR SANTA VITTORIA DR AAC B F 1,603 44 69,474 75 100 0 0 12/7/23 Surface Course - AC 7/1/00 28 13 PASEO DE VALENCIA LA PAZ RD (W) ERICSON WY AAC B D 1,049 38 39,294 75 49 50 1 12/17/23 Surface Course - AC 7/1/04 23 13 MOULTON PKWY SANTA MARIA AVE RIDGE ROUTE DR AAC B F 1,357 48 66,799 76 100 0 0 12/20/23 Overlay - AC Structural 7/1/11 27 14 OSO PKWY NOTTINGHAM CT NELLIE GAIL RD AAC B B 1,176 43 51,748 76 46 43 11 12/13/23 Overlay - AC Structural 7/1/08 19 4 LAGUNA HILLS DR EAST END OF BRIDGE INDIAN HILL LN AAC B E 639 33 23,259 76 90 0 10 12/6/23 Overlay - AC Structural 6/1/10 20 6 LAKE FOREST DR TRITON WY MOULTON PKWY AAC B F 847 40 43,479 76 70 30 0 12/7/23 Surface Course - AC 7/1/00 23 7 MOULTON PKWY ALICIA PKWY VIA LOMAS AAC B C 830 49 33,597 76 87 0 13 12/17/23 Surface Course - AC 7/1/96 23 30 MOULTON PKWY INDIAN CIRCLE LN LAGUNA HILLS DR AAC B E 1,798 38 92,647 76 100 0 0 12/20/23 Overlay - AC Structural 4/1/10 8 12 CABOT RD PASEO DE VALENCIA LA PAZ RD AAC B D 2,604 32 79,192 76 49 51 0 12/6/23 Overlay - AC Structural 1/1/09 23 1 MOULTON PKWY INDIAN CIRCLE LN W. CITY LIMITS AAC B E 674 50 25,585 76 91 9 0 12/20/23 Overlay - AC Structural 4/1/10 8 5 CABOT RD OSO PKWY HITCHING RAIL RD AAC B B 294 40 6,823 77 83 17 0 12/28/23 Overlay - AC Structural 1/1/09 20 11 LAKE FOREST DR SANTA VITTORIA DR MILL CREEK DR AAC B F 1,603 43 69,774 77 100 0 0 12/7/23 Surface Course - AC 7/1/00 23 24 MOULTON PKWY OSO PKWY NELLIE GAIL RD AAC B A 908 52 45,483 77 80 10 10 12/20/23 Surface Course - AC 7/1/99 23 5 MOULTON PKWY RIDGE ROUTE DR EL PACIFICO DR AAC B F 1,539 50 69,992 77 100 0 0 12/17/23 Overlay - AC Structural 7/1/11 6 6 AVENIDA DE LA CARLOTA PVMT CHNGE 650' E/ OAKBROOK VILLAGE LOS ALISOS BLVD AAC B F 505 40 41,675 77 58 25 17 12/29/23 Surface Course - AC 7/1/01 23 8 MOULTON PKWY MANDEVILLE DR ALICIA PKWY AAC B C 1,487 48 77,033 77 67 30 3 12/20/23 Surface Course - AC 7/1/99 4 9 ALICIA PKWY MOULTON PKWY ALISO HILLS DR AAC B C 1,362 42 60,819 78 100 0 0 12/20/23 Overlay - AC Structural 7/10/17 19 8 LAGUNA HILLS DR INDIAN HILL LN EAST END OF BRIDGE AAC B E 613 33 20,968 78 83 9 8 12/6/23 Overlay - AC Structural 6/1/10 20 5 LAKE FOREST DR MILL CREEK DR TRITON WY AAC B F 585 44 23,636 78 100 0 0 12/7/23 Surface Course - AC 7/1/00 4 4 ALICIA PKWY VIA LOMAS PASEO DE VALENCIA AAC B E 1,720 42 78,369 78 54 32 14 12/20/23 Surface Course - AC 7/1/04 23 19 MOULTON PKWY LAKE FOREST DR EL PACIFICO DR AAC B F 1,559 50 69,299 78 91 6 3 12/20/23 Overlay - AC Structural 7/1/06 4 18 ALICIA PKWY LAGUNA CT MOULTON PKWY AAC B C 496 42 28,642 78 100 0 0 12/20/23 Overlay - AC Structural 7/10/17 28 4 PASEO DE VALENCIA AVE DE LA CARLOTA EL TORO RD AAC B F 1,303 38 48,641 79 47 53 0 12/28/23 Overlay - AC Structural 7/1/05 27 2 OSO PKWY MOULTON PKWY WEST HAVEN DR AAC B B 744 43 31,598 79 88 10 2 12/20/23 Overlay - AC Structural 7/1/08 37 2 SANTA VITTORIA DR LANE MERGE BRIDGE AAC C F 173 49 6,660 79 43 57 0 12/6/23 Overlay - AC Structural 7/1/11 8 4 CABOT RD PASEO DE VALENCIA EL PASEO AAC B B 2,803 40 87,603 79 71 21 8 12/7/23 Overlay - AC Structural 1/1/09

Page 2 of 11 ends
Page 504 of 570 ends

City of Laguna Hills, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, PCI Order (0-100)
Branch ID Sec ID Name From To Type Rank Zone L W Area PCI PCI Pct Climate PCI Pct Load PCI Pct Other Insp. Date Work Type Work Date 37 11 SANTA VITTORIA DR LANE MERGE RIDGE ROUTE DR AAC C F 371 22 10,622 79 56 44 0 12/20/23 Overlay - AC Structural 7/1/11 28 12 PASEO DE VALENCIA HILLARY LN VELASQUEZ RD AAC B D 1,021 38 40,980 79 89 10 1 12/13/23 Overlay - AC Structural 7/1/08 23 29 MOULTON PKWY W. CITY LIMITS INDIAN CIRCLE LN AAC B E 585 38 33,769 80 100 0 0 12/20/23 Overlay - AC Structural 4/1/10 23 15 MOULTON PKWY NELLIE GAIL RD OSO PKWY AAC B A 963 48 43,195 80 79 0 21 12/20/23 Surface Course - AC 7/1/99 8 6 CABOT RD HITCHING RAIL RD EL PASEO AAC B B 560 40 17,749 80 100 0 0 12/28/23 Overlay - AC Structural 1/1/09 23 14 MOULTON PKWY SR 73 NELLIE GAIL RD AAC B A 335 54 28,004 80 88 0 12 12/28/23 Surface Course - AC 7/1/99 4 2 ALICIA PKWY MOULTON PKWY LAGUNA CT AAC B C 496 42 18,492 81 100 0 0 12/20/23 Overlay - AC Structural 7/10/17 8 3 CABOT RD OSO PKWY S. CITY LIMITS AAC B B 830 40 27,104 81 81 13 6 12/20/23 Overlay - AC Structural 7/10/17 14 2 GREENFIELD DR SR 73 SB ON/OFF RAMPS SR 73 NB ON/OFF RAMPS AC B A 379 41 15,238 81 79 21 0 12/6/23 Surface Treatment - Slurry Seal 7/1/03 37 12 SANTA VITTORIA DR RIDGE ROUTE DR LANE MERGE AAC C F 285 22 7,794 81 42 58 0 12/20/23 Surface Treatment - Slurry Seal 11/1/21 14 3 GREENFIELD DR SR 73 NB ON/OFF RAMPS SR 73 SB ON/OFF RAMPS AC B A 387 41 16,696 81 99 0 1 12/6/23 Surface Treatment - Slurry Seal 7/1/03 8 11 CABOT RD RAPID FALLS RD (N) N. CITY LIMITS AC B A 163 40 4,570 81 100 0 0 12/28/23 New Construction - Initial 1/1/90 28 26 PASEO DE VALENCIA LA PAZ RD MACKENZIE ST AAC B D 1,468 30 43,922 81 100 0 0 12/17/23 Overlay - AC Structural 7/10/17 23 23 MOULTON PKWY NELLIE GAIL RD S. CITY LIMITS AAC B A 220 48 22,552 81 87 0 13 12/28/23 Surface Course - AC 7/1/99 8 10 CABOT RD EL PASEO HITCHING RAIL RD AAC B B 557 40 19,320 82 99 0 1 12/28/23 Overlay - AC Structural 1/1/09 28 25 PASEO DE VALENCIA MACKENZIE ST LA PAZ RD AAC B D 1,488 29 49,406 82 100 0 0 12/6/23 Overlay - AC Structural 7/10/17 37 10 SANTA VITTORIA DR RIDGE ROUTE DR LANE MERGE AAC C F 342 22 6,625 82 76 24 0 12/20/23 Overlay - AC Structural 7/1/11 18 5 LA PAZ RD CABOT RD I-5 AAC B D 458 31 15,462 83 77 12 11 12/29/23 Surface Course - AC 7/1/00 28 28 PASEO DE VALENCIA EL TORO RD AVE DE LA CARLOTA AAC B F 1,267 41 41,587 83 96 0 4 12/7/23 Overlay - AC Structural 7/1/05 8 8 CABOT RD S. CITY LIMITS OSO PKWY AAC B B 854 40 39,378 83 66 0 34 12/28/23 Overlay - AC Structural 7/10/17 18 16 LA PAZ RD I-5 CABOT RD AAC B D 444 31 18,733 83 100 0 0 12/29/23 Surface Course - AC 7/1/00 21 1 LOS ALISOS BLVD PASEO DE VALENCIA AVENIDA DE LA CARLOTA AAC B E 1,457 38 68,991 84 100 0 0 12/13/23 Overlay - AC Structural 7/10/17 19 6 LAGUNA HILLS DR PASEO DE VALENCIA INDIAN HILL LN AAC B E 2,645 33 86,964 84 87 13 0 12/13/23 Overlay - AC Structural 6/1/10 8 2 CABOT RD S. CITY LIMITS (N) RAPID FALLS DR AAC B A 787 40 39,494 84 85 14 1 12/20/23 Overlay - AC Structural 7/10/17 8 1 CABOT RD EL PASEO PASEO DE VALENCIA AAC B B 2,808 40 86,504 84 82 17 1 12/17/23 Overlay - AC Structural 1/1/09 8 9 CABOT RD HITCHING RAIL RD OSO PKWY AAC B B 294 40 14,472 84 96 0 4 12/28/23 Overlay - AC Structural 1/1/09 19 1 LAGUNA HILLS DR INDIAN HILL LN PASEO DE VALENCIA AAC B E 2,661 33 88,427 84 70 11 19 12/7/23 Overlay - AC Structural 6/1/10 8 7 CABOT RD LA PAZ RD PASEO DE VALENCIA AAC B D 2,640 32 76,674 85 68 11 21 12/6/23 Overlay - AC Structural 1/1/09 28 20 PASEO DE VALENCIA SUNBURST AVE HILLARY LN AAC B D 475 38 19,001 85 99 0 1 12/17/23 Overlay - AC Structural 7/1/08 21 4 LOS ALISOS BLVD AVENIDA DE LA CARLOTA PASEO DE VALENCIA AAC B E 1,482 40 62,089 85 97 0 3 12/13/23 Overlay - AC Structural 7/10/17 28 11 PASEO DE VALENCIA CABOT RD PINE NUT RD AAC B D 784 29 20,531 85 96 0 4 12/6/23 Overlay - AC Structural 7/10/17 37 14 SANTA VITTORIA DR BARBERA AVENIDA DEL SOL AAC C F 793 36 25,816 86 100 0 0 12/6/23 Overlay - AC Structural 7/1/11 8 14 CABOT RD RAPID FALLS RD S. CITY LIMITS AAC B A 812 40 35,932 86 82 15 3 12/20/23 Overlay - AC Structural 7/10/17 27 5 OSO PKWY CABOT RD E. CITY LIMITS AAC B B 207 47 7,423 86 64 36 0 12/29/23 Surface Course - AC 7/1/99 20 8 LAKE FOREST DR SANTA VITTORIA DR W CITY LIMITS AAC B F 431 51 18,474 86 85 15 0 12/7/23 Surface Course - AC 7/1/00 28 14 PASEO DE VALENCIA PINE NUT RD (W) MACKENZIE ST AAC B D 827 29 23,657 86 76 24 0 12/6/23 Overlay - AC Structural 7/10/17 27 3 OSO PKWY MOULTON PKWY W. CITY LIMITS AAC B B 209 68 8,093 86 100 0 0 12/28/23 Surface Course - AC 7/1/99 19 7 LAGUNA HILLS DR WEST END OF BRIDGE MOULTON PKWY AAC B E 465 33 20,690 87 86 14 0 12/20/23 Overlay - AC Structural 6/1/10 28 6 PASEO DE VALENCIA MACKENZIE ST (W) PINE NUT RD AAC B D 827 29 25,337 87 98 0 2 12/6/23 Overlay - AC Structural 7/10/17 36 1 SANTA MARIA AVE VIA VISTA W CITY LIMITS AAC B F 950 30 23,580 87 96 0 4 12/6/23 Overlay - AC Structural 7/1/11 21 2 LOS ALISOS BLVD AVENIDA DE LA CARLOTA I-5 OVERPASS AAC B E 757 28 27,480 87 100 0 0 12/13/23 Overlay - AC Structural 7/10/17 28 18 PASEO DE VALENCIA PINE NUT RD CABOT RD AAC B D 777 29 21,385 87 77 0 23 12/6/23 Overlay - AC Structural 7/10/17 27 11 OSO PKWY E. CITY LIMITS CABOT RD AAC B B 207 47 13,080 88 100 0 0 12/29/23 Surface Course - AC 7/1/99 37 9 SANTA VITTORIA DR BASSANO EAST LANE MERGE AAC C F 401 22 9,662 88 100 0 0 12/6/23 Overlay - AC Structural 7/1/11 21 3 LOS ALISOS BLVD I-5 OVERPASS AVENIDA DE LA CARLOTA AAC B E 699 28 27,034 88 100 0 0 12/13/23 Overlay - AC Structural 7/10/17 27 7 OSO PKWY W. CITY LIMITS MOULTON PKWY AAC B B 209 40 13,520 88 98 0 2 12/28/23 Surface Course - AC 7/1/99 37 7 SANTA VITTORIA DR LAKE FOREST DR BASSANO AAC C F 392 22 8,449 88 100 0 0 12/6/23 Overlay - AC Structural 7/1/11 36 2 SANTA MARIA AVE W CITY LIMITS VIA VISTA AAC B F 979 30 23,478 88 96 0 4 12/6/23 Overlay - AC Structural 7/1/11 37 6 SANTA VITTORIA DR BASSANO EAST LAKE FOREST DR AAC C F 370 22 11,176 89 100 0 0 12/6/23 Surface Treatment - Slurry Seal 11/1/21 37 13 SANTA VITTORIA DR SANTA MARIA AVE BARBERA AAC C F 1,095 36 34,696 90 100 0 0 12/6/23 Overlay - AC Structural 7/1/11 37 1 SANTA VITTORIA DR LANE MERGE RIDGE ROUTE DR AAC C F 332 22 4,971 90 100 0 0 12/20/23 Surface Treatment - Slurry Seal 11/1/21 33 6 RIDGE ROUTE DR MOULTON PKWY NARROWS AAC B F 470 40 16,290 90 100 0 0 12/7/23 Overlay - AC Structural 12/1/13 37 15 SANTA VITTORIA DR AVENIDA DEL SOL SAN REMO DR AAC C F 513 36 16,608 90 100 0 0 12/6/23 Overlay - AC Structural 7/1/11 33 10 RIDGE ROUTE DR AVENIDA DE LA CARLOTA NARROWS AAC B F 1,000 26 37,821 91 100 0 0 12/7/23 Overlay - AC Structural 12/1/13 33 7 RIDGE ROUTE DR MOULTON PKWY MILL CREEK DR AAC B F 767 40 25,464 91 95 0 5 12/7/23 Overlay - AC Structural 11/1/21 33 3 RIDGE ROUTE DR PERALTA DR WEST TO WIDENING AAC B F 1,816 45 65,021 91 100 0 0 12/7/23 Overlay - AC Structural 12/1/13 37 16 SANTA VITTORIA DR SAN REMO DR LANE MERGE AAC C F 670 36 26,017 91 71 29 0 12/6/23 Overlay - AC Structural 7/1/11 33 1 RIDGE ROUTE DR PERALTA DR EAST TO WIDENING AAC B F 1,635 50 70,196 92 63 33 4 12/7/23 Overlay - AC Structural 12/1/13 33 2 RIDGE ROUTE DR MILL CREEK DR MOULTON PKWY AC B F 767 40 32,124 92 93 0 7 12/7/23 New Construction - Initial 1/1/90 37 5 SANTA VITTORIA DR LANE MERGE CMTO COSTA AAC C F 1,250 38 45,543 92 100 0 0 12/6/23 Overlay - AC Structural 7/1/11 33 5 RIDGE ROUTE DR NARROWS MOULTON PKWY AAC B F 468 40 21,163 92 92 0 8 12/20/23 Overlay - AC Structural 12/1/13 4 8 ALICIA PKWY I-5 HON AVE AAC B E 793 42 39,807 93 100 0 0 12/17/23 Overlay - AC Structural 7/1/16

Page 3 of 11 ends
Page 505 of 570 ends

City of Laguna Hills, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, PCI Order (0-100)
Branch ID Sec ID Name From To Type Rank Zone L W Area PCI PCI Pct Climate PCI Pct Load PCI Pct Other Insp. Date Work Type Work Date 13 4 EL TORO RD AVENIDA DE LA CARLOTA PASEO DE VALENCIA AAC B F 1,412 36 66,012 93 100 0 0 12/7/23 Overlay - AC Structural 7/1/07 4 16 ALICIA PKWY HON AVE I-5 AAC B E 848 48 40,869 94 81 0 19 12/17/23 Overlay - AC Structural 7/1/04 33 9 RIDGE ROUTE DR NARROWS AVE DE LA CARLOTA AAC B F 1,047 40 38,624 94 100 0 0 12/7/23 Overlay - AC Structural 12/1/13 13 3 EL TORO RD AVENIDA DE LA CARLOTA I-5 AAC B F 570 63 29,770 94 92 0 8 12/29/23 Surface Course - AC 7/1/01 37 4 SANTA VITTORIA DR CMTO COSTA BRIDGE AAC C F 876 38 30,457 94 100 0 0 12/6/23 Overlay - AC Structural 7/1/11 4 10 ALICIA PKWY W. CITY LIMITS LAGUNA CT AAC B C 850 42 35,560 94 100 0 0 12/17/23 Overlay - AC Structural 7/10/17 13 1 EL TORO RD PASEO DE VALENCIA AVENIDA DE LA CARLOTA AAC B F 1,498 36 68,551 95 100 0 0 12/7/23 Overlay - AC Structural 7/1/07 13 2 EL TORO RD I-5 AVENIDA DE LA CARLOTA AAC B F 555 54 26,647 95 100 0 0 12/29/23 Surface Course - AC 7/1/01 20 10 LAKE FOREST DR AVENIDA DE LA CARLOTA E. CITY LIMITS AAC B F 888 59 41,693 95 100 0 0 12/20/23 Overlay - AC Structural 7/1/16 20 3 LAKE FOREST DR E. CITY LIMITS AVENIDA DE LA CARLOTA AAC B F 818 59 51,899 95 100 0 0 12/20/23 Overlay - AC Structural 7/1/16 33 8 RIDGE ROUTE DR MILL CREEK DR SANTA VITTORIA DR AAC B F 2,448 40 77,725 95 100 0 0 12/6/23 Overlay - AC Structural 11/1/21 33 4 RIDGE ROUTE DR SANTA VITTORIA DR MILL CREEK DR AC B F 2,443 40 76,807 95 100 0 0 12/6/23 New Construction - Initial 1/1/90 4 17 ALICIA PKWY LAGUNA CT W. CITY LIMITS AAC B C 850 42 37,155 95 100 0 0 12/20/23 Overlay - AC Structural 7/10/17 37 8 SANTA VITTORIA DR LANE MERGE BASSANO EAST AAC C F 419 22 10,152 96 100 0 0 12/6/23 Surface Treatment - Slurry Seal 11/1/21

42.6 9,067,736
Locals
122 1 ENCANTO CT LUNA BONITA DR SOUTH END AC E C 280 39 11,487 64 52 48 0 11/22/23 New Construction - Initial 1/1/80 167 1 LA SERRA ST ALISO HILLS DR NORTH END AC E C 715 38 26,496 67 44 56 0 12/1/23 New Construction - Initial 1/1/80 319 1 VIA LOMAS MOULTON PKWY ALICIA PKWY AC E E 2,600 37 95,841 67 49 51 0 3/14/22 New Construction - Initial 1/1/80 112 3 EARHART RD DE SALLE DR ERICSON WY AAC E D 240 33 7,826 72 89 7 4 11/30/23 Overlay - AC Structural 7/1/11 97 1 COSTEAU ST ALICIA PKWY BECKENHAM ST AAC E E 1,650 36 54,739 72 57 0 43 4/6/22 Overlay - AC Structural 7/1/11 170 1 LAS ALTURAS AVE MANDEVILLE DR MONTE ROYALE ST AAC E C 1,025 37 33,124 73 34 62 4 11/26/23 Overlay - AC Structural 7/1/11 16 3 INDIAN HILL LN OWL HILL LN ASH CREEK LN AAC E E 909 38 33,150 73 79 0 21 12/1/23 Crack Sealing - AC 7/1/05 16 3 INDIAN HILL LN OWL HILL LN ASH CREEK LN AAC E E 909 38 33,150 73 79 0 21 12/1/23 Grinding (Localized) 7/1/05 16 3 INDIAN HILL LN OWL HILL LN ASH CREEK LN AAC E E 909 38 33,150 73 79 0 21 12/1/23 Overlay - AC Structural 7/1/05 16 3 INDIAN HILL LN OWL HILL LN ASH CREEK LN AAC E E 909 38 33,150 73 79 0 21 12/1/23 Patching - AC Deep 7/1/05 66 1 BOOTHILL CT DILLION RD WEST END AAC E A 475 38 17,758 74 72 28 0 4/8/22 Overlay - AC Structural 8/1/14 123 2 ERICSON WY EARHART RD PASEO DE VALENCIA AAC E D 1,393 37 49,085 74 33 33 34 4/8/22 Overlay - AC Structural 7/1/11 71 1 BUCKBOARD LN BUCKSKIN DR STENSON PL AAC E B 1,217 39 45,760 75 73 27 0 12/4/23 Surface Treatment - Slurry Seal 11/1/21 25 11 NELLIE GAIL RD ROCKING HORSE LN EMPTY SADDLE DR AAC E A 611 38 22,929 75 35 64 1 12/1/23 Surface Treatment - Slurry Seal 6/1/18 106 1 DEPUTY CIR DILLION RD SOUTH END AAC E A 1,245 34 44,708 75 77 23 0 4/8/22 Overlay - AC Structural 8/1/14 246 1 RED BARN CIR NELLIE GAIL RD NORTH END AAC E A 165 33 7,822 75 81 15 4 11/30/23 Surface Treatment - Slurry Seal 6/1/18 281 1 SOUTHAMPTON CT CREEKVIEW DR NORTH END AAC E E 75 61 4,554 76 100 0 0 12/4/23 Overlay - AC Structural 6/1/18 186 2 LUNA BONITA DR ENCANTO CT ALISO HILLS DR AAC E C 1,549 33 51,367 76 80 16 4 11/22/23 Overlay - AC Structural 7/1/11 1 4 ALAMEDA AVE ELENA DR MONTE ROYALE ST AAC E C 771 38 27,118 76 57 28 15 11/30/23 Overlay - AC Structural 7/1/11 95 1 COSTEAU CT COSTEAU ST NORTH END AAC E E 110 49 5,199 76 54 46 0 4/6/22 Overlay - AC Structural 7/1/11 313 2 VELASQUEZ RD MAWSON DR EARHART AAC E D 288 33 9,661 77 80 20 0 11/30/23 Patching - AC Deep 8/1/14 112 4 EARHART RD ERICSON WY LAS BOLSAS ST AC E D 255 33 9,265 77 60 34 6 11/26/23 Patching - AC Deep 8/1/14 219 1 OAK LEAF RD SPRUCE LN EVERGREEN RD AAC E D 860 37 33,484 77 37 63 0 11/26/23 Surface Treatment - Slurry Seal 6/1/18 138 1 GEORGIA SUE DR JORIE DR EAST END AAC E E 1,365 37 49,377 77 85 8 7 12/1/23 Overlay - AC Structural 7/1/05 5 3 ALISO HILLS DR LUNA BONITA DR LA SERRA ST AAC E C 1,689 38 61,689 78 52 47 1 11/30/23 Crack Sealing - AC 7/1/05 5 3 ALISO HILLS DR LUNA BONITA DR LA SERRA ST AAC E C 1,689 38 61,689 78 52 47 1 11/30/23 Grinding (Localized) 7/1/05 5 3 ALISO HILLS DR LUNA BONITA DR LA SERRA ST AAC E C 1,689 38 61,689 78 52 47 1 11/30/23 Overlay - AC Structural 7/1/05 5 3 ALISO HILLS DR LUNA BONITA DR LA SERRA ST AAC E C 1,689 38 61,689 78 52 47 1 11/30/23 Patching - AC Deep 7/1/05 25 17 NELLIE GAIL RD LANE MERGE OSO PKWY AAC E A 968 20 21,182 78 62 28 10 12/4/23 Patching - AC Deep 8/1/14 95 2 COSTEAU CT COSTEAU ST NORTH END AAC E E 115 48 5,694 78 100 0 0 4/6/22 Overlay - AC Structural 7/1/11 235 1 PINE STRAP CIR HIDDEN TRAIL RD WEST END AAC E A 725 33 27,434 78 73 27 0 4/8/22 Overlay - AC Structural 8/1/14 25 14 NELLIE GAIL RD RED LODGE PL ROCKING HORSE LN AAC E A 1,606 40 60,747 78 62 36 2 12/4/23 Overlay - AC Structural 7/1/17 99 1 CREEKVIEW DR WEST END CHRISTINA CT AAC E E 1,315 34 45,673 79 100 0 0 12/4/23 Overlay - AC Structural 6/1/18 313 5 VELASQUEZ RD EARHART NORTHRUP AAC E D 276 33 9,411 79 73 21 6 11/30/23 Patching - AC Deep 8/1/14 208 1 MONTE ROYALE ST ALAMEDA AVE LOS ALAMITOS AVE AAC E C 1,225 37 45,287 79 86 0 14 3/29/18 Overlay - AC Structural 7/1/11 283 1 SOUTHPORT ST WOOLWICH ST EAST END AAC E E 1,570 34 53,832 79 71 28 1 4/6/22 Overlay - AC Structural 7/1/11 1 5 ALAMEDA AVE LA PAZ RD MONTE ROYALE ST AAC E C 449 38 15,032 79 76 20 4 11/26/23 Crack Sealing - AC 7/1/05 1 5 ALAMEDA AVE LA PAZ RD MONTE ROYALE ST AAC E C 449 38 15,032 79 76 20 4 11/26/23 Grinding (Localized) 7/1/05 1 5 ALAMEDA AVE LA PAZ RD MONTE ROYALE ST AAC E C 449 38 15,032 79 76 20 4 11/26/23 Overlay - AC Structural 7/1/05 1 5 ALAMEDA AVE LA PAZ RD MONTE ROYALE ST AAC E C 449 38 15,032 79 76 20 4 11/26/23 Patching - AC Deep 7/1/05 313 3 VELASQUEZ RD GRISSOM RD PASEO DE VALENCIA AC E D 145 33 5,469 79 63 31 6 11/30/23 Patching - AC Deep 8/1/14 175 2 LINDA VISTA DR ALISAL AVE SARITA DR AAC E C 928 37 33,659 79 91 0 9 11/30/23 Overlay - AC Structural 7/1/11 25 12 NELLIE GAIL RD LOST COLT DR MOULTON PKWY AAC E A 575 19 9,886 79 61 39 0 12/4/23 Surface Treatment - Slurry Seal 6/1/18 5 1 ALISO HILLS DR LA CIENEGA ST SIERRA BONITA DR AAC E C 753 38 27,153 80 63 21 16 11/30/23 Grinding (Localized) 7/1/05 5 1 ALISO HILLS DR LA CIENEGA ST SIERRA BONITA DR AAC E C 753 38 27,153 80 63 21 16 11/30/23 Overlay - AC Structural 7/1/05

Page 4 of 11 ends
Page 506 of 570 ends

City of Laguna Hills, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, PCI Order (0-100)
Branch ID Sec ID Name From To Type Rank Zone L W Area PCI PCI Pct Climate PCI Pct Load PCI Pct Other Insp. Date Work Type Work Date 5 1 ALISO HILLS DR LA CIENEGA ST SIERRA BONITA DR AAC E C 753 38 27,153 80 63 21 16 11/30/23 Patching - AC Deep 7/1/05 25 15 NELLIE GAIL RD ROAD SPLIT EMPTY SADDLE DR AAC E A 321 38 11,759 80 61 39 0 12/4/23 Surface Treatment - Slurry Seal 6/1/18 259 1 SADDLEHORN LN BUCKSKIN LN SOUTH END AAC E B 315 39 13,308 80 94 0 6 12/4/23 Surface Treatment - Slurry Seal 11/1/21 5 4 ALISO HILLS DR LA SERRA ST MENDOCINO AV AAC E C 763 38 28,071 80 90 10 0 11/26/23 Crack Sealing - AC 7/1/05 5 4 ALISO HILLS DR LA SERRA ST MENDOCINO AV AAC E C 763 38 28,071 80 90 10 0 11/26/23 Grinding (Localized) 7/1/05 5 4 ALISO HILLS DR LA SERRA ST MENDOCINO AV AAC E C 763 38 28,071 80 90 10 0 11/26/23 Overlay - AC Structural 7/1/05 5 4 ALISO HILLS DR LA SERRA ST MENDOCINO AV AAC E C 763 38 28,071 80 90 10 0 11/26/23 Patching - AC Deep 7/1/05 111 1 DILLION RD LOST TRAIL DR EAST END AAC E A 1,840 38 70,587 80 39 61 0 4/8/22 Surface Treatment - Slurry Seal 6/1/18 127 1 EVERGREEN RD OAK LEAF RD FIR LN AAC E D 800 37 28,763 80 75 8 17 12/1/23 Surface Treatment - Slurry Seal 6/1/18 145 2 GRISSOM RD BARENTS ST EAST END AAC E D 925 35 28,657 80 42 56 2 4/6/22 Surface Treatment - Slurry Seal 6/1/18 15 2 HON AVE CAMBERWELL ST ALICIA PKWY AAC E E 829 37 22,925 80 40 60 0 3/14/22 Overlay - AC Structural 7/1/11 178 1 LONE ACRES LN LOST TRAIL DR EAST END AAC E A 520 37 20,025 80 64 34 2 4/8/22 Overlay - AC Structural 8/1/14 192 1 MANDEVILLE DR EAST END MOULTON PKWY AAC E C 1,685 38 61,758 80 76 8 16 11/26/23 Overlay - AC Structural 7/1/11 71 2 BUCKBOARD LN STENSON PL NELLIE GAIL RD AAC E B 1,691 39 62,796 80 55 43 2 11/26/23 Overlay - AC Structural 7/1/11 171 1 LAS ALTURAS CT LAS ALTURAS AVE EAST END AAC E C 170 43 7,714 80 88 10 2 12/4/23 Overlay - AC Structural 7/1/11 150 1 HIGHWOOD CIR ROCKING HORSE LN NORTH END AAC E A 805 40 27,201 81 63 0 37 12/1/23 Surface Treatment - Slurry Seal 6/1/18 175 1 LINDA VISTA DR LARGO DR ALISAL AVE AAC E C 1,037 37 36,215 81 88 12 0 11/30/23 Overlay - AC Structural 7/1/11 312 1 VALERIE ST BENTLEY LN COSTEAU DR AAC E D 225 36 8,627 81 36 64 0 11/30/23 Overlay - AC Structural 7/1/11 86 2 CHAMPLAIN RD GRISSOM RD LAPAZ RD AAC E D 1,260 33 40,950 81 89 11 0 11/26/23 Surface Treatment - Slurry Seal 6/1/18 322 1 WAGON WHEEL DR HIDDEN TRAIL RD EAST END AAC E A 785 36 26,820 81 64 36 0 11/30/23 Surface Treatment - Slurry Seal 6/1/18 236 1 PINEWOOD LN WEST END OAK LEAF RD AAC E D 235 33 10,244 81 47 38 15 11/26/23 Surface Treatment - Slurry Seal 6/1/18 285 1 SPRUCE LN WEST END OAK LEAF RD AAC E D 330 42 13,199 81 58 42 0 12/1/23 Surface Treatment - Slurry Seal 6/1/18 65 1 BOONE PL CADALLAC DR SOUTH END AAC E D 170 43 8,064 81 32 68 0 4/6/22 Surface Treatment - Slurry Seal 6/1/18 78 1 CALIFIA DR MACKENZIE ST LA SUEN RD AAC E D 865 36 30,061 81 54 43 3 4/6/22 Surface Treatment - Slurry Seal 6/1/18 145 5 GRISSOM RD ERICSON WY PIKE RD AAC E D 1,000 35 29,111 81 65 33 2 4/8/22 Overlay - AC Structural 7/1/11 148 1 HENDON ST COSTEAU ST CAMBERWELL ST AAC E E 1,255 33 42,452 81 100 0 0 4/6/22 Overlay - AC Structural 7/1/05 183 1 LOST COLT DR MAVERICK CIR STAGELINE DR AAC E A 905 38 30,716 81 50 46 4 5/11/20 Overlay - AC Structural 8/1/12 32 2 RAPID FALLS RD SUNDOWNER DR LOST TRAIL DR AAC E A 1,055 38 38,956 81 45 49 6 5/11/20 Overlay - AC Structural 8/1/12 254 1 ROCKING HORSE LN NELLIE GAIL RD NORTH END AAC E A 970 39 32,425 81 58 40 2 11/26/23 Surface Treatment - Slurry Seal 6/1/18 25 16 NELLIE GAIL RD MOULTON PKWY LOST COLT DR AAC E A 603 20 10,300 81 61 39 0 12/4/23 Overlay - AC Structural 7/1/17 271 1 SAUSALITO ST ALAMEDA AVE EAST END AAC E C 1,325 35 45,077 81 91 0 9 11/22/23 Overlay - AC Fabric 1/1/20 90 1 CHRISTINA CT EAST END WEST END AAC E E 1,050 36 37,048 81 92 0 8 11/22/23 Overlay - AC Structural 6/1/18 145 6 GRISSOM RD GRISSOM RD NORTH END AAC E D 132 33 6,783 82 88 11 1 12/4/23 Overlay - AC Structural 7/1/11 276 1 SILVER SADDLE LN BUCKSKIN DR SOUTH END AAC E B 315 39 13,194 82 55 43 2 11/26/23 Surface Treatment - Slurry Seal 11/1/21 342 4 HIDDEN TRAIL RD STAGELINE DR NELLIE GAIL RD AAC E A 1,944 38 72,936 82 88 10 2 4/8/22 Overlay - AC Structural 8/1/14 15 1 HON AVE ALICIA PKWY CAMBERWELL ST AAC E E 777 27 20,311 82 62 36 2 3/14/22 Overlay - AC Structural 7/1/11 16 2 INDIAN HILL LN LAGUNA HILLS DR OWL HILL LN AAC E E 485 38 16,188 82 55 28 17 12/4/23 Crack Sealing - AC 7/1/05 16 2 INDIAN HILL LN LAGUNA HILLS DR OWL HILL LN AAC E E 485 38 16,188 82 55 28 17 12/4/23 Grinding (Localized) 7/1/05 16 2 INDIAN HILL LN LAGUNA HILLS DR OWL HILL LN AAC E E 485 38 16,188 82 55 28 17 12/4/23 Overlay - AC Structural 7/1/05 16 2 INDIAN HILL LN LAGUNA HILLS DR OWL HILL LN AAC E E 485 38 16,188 82 55 28 17 12/4/23 Patching - AC Deep 7/1/05 190 1 MADEIRA DR PADUA DR SOUTH END AAC E D 290 33 12,919 82 53 47 0 4/6/22 Surface Treatment - Slurry Seal 6/1/18 237 1 PINTO CT LOST TRAIL DR EAST END AAC E A 170 33 8,226 82 100 0 0 4/8/22 Overlay - AC Structural 8/1/14 256 1 RODEO CIR HIDDEN TRAIL RD EAST END AAC E A 415 38 15,843 82 66 31 3 4/8/22 Overlay - AC Structural 8/1/14 338 1 WOOLWICH ST COSTEAU ST WOOLWICH CT AAC E E 445 33 14,821 82 100 0 0 4/6/22 Overlay - AC Structural 7/1/11 350 1 YORK CIR WILKES PL WEST END AAC E E 605 33 21,669 82 47 51 2 4/6/22 Overlay - AC Structural 7/1/11 5 6 ALISO HILLS DR ALICIA PKWY LA CIENEGA ST AAC E C 713 38 23,624 82 58 42 0 11/30/23 Grinding (Localized) 7/1/05 5 6 ALISO HILLS DR ALICIA PKWY LA CIENEGA ST AAC E C 713 38 23,624 82 58 42 0 11/30/23 Overlay - AC Thin 7/1/05 5 6 ALISO HILLS DR ALICIA PKWY LA CIENEGA ST AAC E C 713 38 23,624 82 58 42 0 11/30/23 Patching - AC Deep 7/1/05 25 13 NELLIE GAIL RD LOST COLT DR RED LODGE PL AAC E A 645 40 24,097 82 87 13 0 12/1/23 Surface Treatment - Slurry Seal 6/1/18 5 2 ALISO HILLS DR LA PAZ RD LUNA BONITA DR AAC E C 453 38 15,254 83 88 12 0 11/30/23 Crack Sealing - AC 7/1/05 5 2 ALISO HILLS DR LA PAZ RD LUNA BONITA DR AAC E C 453 38 15,254 83 88 12 0 11/30/23 Grinding (Localized) 7/1/05 5 2 ALISO HILLS DR LA PAZ RD LUNA BONITA DR AAC E C 453 38 15,254 83 88 12 0 11/30/23 Overlay - AC Thin 7/1/05 5 2 ALISO HILLS DR LA PAZ RD LUNA BONITA DR AAC E C 453 38 15,254 83 88 12 0 11/30/23 Patching - AC Deep 7/1/05 5 5 ALISO HILLS DR MENDOCINO AV LA CIENEGA ST AAC E C 992 38 35,696 83 85 0 15 11/30/23 Grinding (Localized) 7/1/05 5 5 ALISO HILLS DR MENDOCINO AV LA CIENEGA ST AAC E C 992 38 35,696 83 85 0 15 11/30/23 Overlay - AC Structural 7/1/05 5 5 ALISO HILLS DR MENDOCINO AV LA CIENEGA ST AAC E C 992 38 35,696 83 85 0 15 11/30/23 Patching - AC Deep 7/1/05 328 1 WHITE ALDER LN McINTYRE ST OAK LEAF RD AAC E D 435 37 16,224 83 80 0 20 11/26/23 Surface Treatment - Slurry Seal 6/1/18 25 10 NELLIE GAIL RD OSO PKWY LANE MERGE AAC E A 983 20 19,855 83 83 14 3 12/4/23 Surface Treatment - Slurry Seal 6/1/18 75 1 CADILLAC DR GRISSOM RD BOONE PL AAC E D 575 33 18,649 83 47 37 16 4/6/22 Surface Treatment - Slurry Seal 6/1/18 89 1 CHELSEA LN NOTTINGHAM CT SOUTH END AAC E A 310 33 10,946 83 27 0 73 4/7/22 Overlay - AC Structural 8/1/14 103 2 DE SALLE ST EARHART RD GRISSOM RD AAC E D 1,239 33 38,918 83 48 52 0 5/11/20 Overlay - AC Structural 8/1/12 115 1 EL DORADO DR STAGE COACH DR PRESIDIO DR AAC E D 860 33 27,880 83 39 59 2 4/8/22 Surface Treatment - Slurry Seal 6/1/18

Page 5 of 11 ends
Page 507 of 570 ends

City of Laguna Hills, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, PCI Order (0-100)
Branch ID Sec ID Name From To Type Rank Zone L W Area PCI PCI Pct Climate PCI Pct Load PCI Pct Other Insp. Date Work Type Work Date 131 1 FARGO RD ROCKRIDGE RD SOUTH END AAC E A 535 37 20,058 83 76 24 0 4/8/22 Overlay - AC Structural 8/1/14 32 3 RAPID FALLS RD LOST TRAIL DR HIDDEN TRAIL RD AAC E A 1,292 38 47,436 83 43 50 7 5/11/20 Overlay - AC Structural 8/1/12 266 1 SANDRIDGE CIR WESTRIDGE LN EAST END AAC E A 135 46 6,755 83 65 28 7 4/8/22 Overlay - AC Structural 8/1/14 297 1 SUTTER DR EL DORADO DR WEST END AAC E D 600 36 22,524 83 37 63 0 4/8/22 Surface Treatment - Slurry Seal 6/1/18 337 1 WOOLWICH CT WOOLWICH ST WEST END AAC E E 150 45 6,916 83 100 0 0 4/6/22 Overlay - AC Structural 7/1/11 161 1 KNOTTY PINE RD McINTYRE ST MACKENZIE ST AAC E D 525 33 19,009 83 100 0 0 11/26/23 Surface Treatment - Slurry Seal 6/1/18 60 1 BEARGRASS CIR LOST COLT DR SOUTH END AAC E A 165 33 7,683 84 70 30 0 11/30/23 Surface Treatment - Slurry Seal 6/1/18 145 1 GRISSOM RD PIKE RD LA PAZ RD AC E D 125 33 4,415 84 100 0 0 12/1/23 Surface Treatment - Slurry Seal 6/1/18 186 1 LUNA BONITA DR LA SERRA ST ENCANTO CT AAC E C 662 33 21,636 84 97 0 3 11/22/23 Overlay - AC Structural 7/1/11 1 2 ALAMEDA AVE EL PRADO ST DEL MONTE ST AAC E C 730 38 27,165 84 60 19 21 11/30/23 Overlay - AC Structural 7/1/11 284 1 SPOTTED PONY LN EAST END WEST END AAC E A 955 39 30,432 84 87 13 0 11/30/23 Surface Treatment - Slurry Seal 6/1/18 80 1 CAMBERWELL ST HON AVE HENDON ST AAC E E 1,103 37 39,161 84 64 36 0 4/6/22 Overlay - AC Structural 7/1/11 80 2 CAMBERWELL ST HENDON COUSTEU ST AAC E E 607 37 22,917 84 65 35 0 4/6/22 Overlay - AC Structural 7/1/11 96 1 COSTEAU DR ALICIA PKWY CAJON DR AAC E D 1,980 36 70,756 84 38 57 5 4/6/22 Surface Treatment - Slurry Seal 6/1/18 140 1 GOLD DUST LN HIDDEN TRAIL RD SOUTH END AAC E A 910 36 32,723 84 75 25 0 4/8/22 Overlay - AC Structural 8/1/14 324 1 MACKENZIE CT MACKENZIE ST SOUTH END AC E D 85 60 5,045 84 17 83 0 4/8/22 Surface Treatment - Slurry Seal 6/1/18 16 1 INDIAN HILL LN MOULTON PKWY ASH CREEK LN AAC E E 662 38 23,777 84 97 0 3 12/1/23 Crack Sealing - AC 7/1/05 16 1 INDIAN HILL LN MOULTON PKWY ASH CREEK LN AAC E E 662 38 23,777 84 97 0 3 12/1/23 Grinding (Localized) 7/1/05 16 1 INDIAN HILL LN MOULTON PKWY ASH CREEK LN AAC E E 662 38 23,777 84 97 0 3 12/1/23 Overlay - AC Structural 7/1/05 16 1 INDIAN HILL LN MOULTON PKWY ASH CREEK LN AAC E E 662 38 23,777 84 97 0 3 12/1/23 Patching - AC Deep 7/1/05 169 1 LARGO DR WEST END LINDA VISTA DR AAC E C 1,430 35 50,183 84 51 49 0 11/30/23 Overlay - AC Structural 7/1/11 113 1 EL CAPITAN LN CREEK DR LARGO DR AAC E C 880 33 30,241 85 82 0 18 11/30/23 Overlay - AC Structural 7/1/11 336 1 WOODCREEK DR SW to CREEKVIEW DR LOS ALISOS BLVD AAC E E 245 33 8,798 85 85 15 0 11/30/23 Overlay - AC Structural 6/1/18 57 1 BARENTS ST HILLARY LN GRISSOM RD AAC E D 1,300 33 43,337 85 56 37 7 4/6/22 Surface Treatment - Slurry Seal 6/1/18 86 3 CHAMPLAIN RD PIKE RD CHARLEMAGNE RD AAC E D 725 33 25,502 85 57 43 0 5/11/20 Overlay - AC Structural 8/1/12 112 5 EARHART RD VELASQUEZ RD LAS BOLSAS ST AAC E D 1,168 37 41,943 85 57 43 0 5/11/20 Overlay - AC Structural 8/1/12 123 1 ERICSON WY COSTEAU DR EARHART RD AAC E D 1,105 37 38,951 85 62 33 5 4/8/22 Overlay - AC Structural 7/1/11 342 3 HIDDEN TRAIL RD DERBYHILL DR STAGELINE DR AAC E A 1,392 38 52,671 85 40 60 0 5/11/20 Overlay - AC Structural 8/1/12 184 1 LOST TRAIL DR RAPID FALLS RD DILLION RD AAC E A 1,880 38 69,669 85 54 46 0 4/8/22 Surface Treatment - Slurry Seal 6/1/18 227 1 PASEO DE ALICIA ALICIA PKWY EAST END AAC E D 260 60 15,172 85 47 42 11 5/11/20 Overlay - AC Structural 8/1/12 233 1 PIKE RD LA SUEN RD MACKENZIE ST AAC E D 962 33 32,366 85 49 48 3 4/6/22 Surface Treatment - Slurry Seal 6/1/18 287 1 STAGE COACH DR MACKENZIE ST EL DORADO DR AAC E D 625 37 24,100 85 57 40 3 4/8/22 Surface Treatment - Slurry Seal 6/1/18 326 2 WESTRIDGE LN SANDRIDGE CIR MAVERICK CIR AAC E A 655 38 24,632 85 42 44 14 5/11/20 Overlay - AC Structural 8/1/12 290 1 STENSON PL BUCKSBOARD LN NORTH END AAC E B 625 39 22,856 85 60 40 0 11/30/23 Surface Treatment - Slurry Seal 11/1/21 228 1 PATRICIA ST LUPITA ST EAST END AC E C 420 37 15,727 85 100 0 0 11/22/23 Surface Treatment - Slurry Seal 11/1/21 57 3 BARENTS ST WILKES PL EAST END AAC E D 1,310 36 46,447 86 50 42 8 5/11/20 Overlay - AC Structural 8/1/12 128 1 EXPRESS DR ELDORADO DR WEST END AAC E D 600 36 21,816 86 79 21 0 4/8/22 Surface Treatment - Slurry Seal 6/1/18 183 2 LOST COLT DR STAGELINE DR BEARGRASS CIR AAC E A 1,688 40 56,926 86 45 55 0 5/11/20 Overlay - AC Structural 8/1/12 220 1 ORELLANO WY PIKE RD NORTH END AAC E D 870 36 27,834 86 93 0 7 4/8/22 Overlay - AC Fabric 8/1/14 32 1 RAPID FALLS RD CABOT RD SUNDOWNER DR AAC E A 997 38 36,020 86 51 43 6 5/11/20 Overlay - AC Structural 8/1/12 250 1 RICKENBACKER RD PIKE RD LA PAZ RD AAC E D 135 33 4,867 86 45 55 0 4/6/22 Surface Treatment - Slurry Seal 6/1/18 255 1 ROCKRIDGE RD HIDDEN TRAIL RD EAST END AAC E A 995 36 35,695 86 27 64 9 4/8/22 Surface Treatment - Slurry Seal 6/1/18 261 1 SALFORD ST SOUTHPORT ST COSTEAU ST AAC E E 950 33 33,748 86 57 40 3 4/6/22 Overlay - AC Structural 7/1/11 34 4 SAN REMO DR PALERMO PESARO AAC E F 482 32 15,198 86 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 321 1 VISTA VIEJO CITY LIMIT DEVONSHIRE RD AAC E A 1,530 39 53,056 86 23 77 0 5/11/20 Overlay - AC Structural 8/1/12 326 1 WESTRIDGE LN LOST COLT DR SANDRIDGE CIR AAC E A 2,031 38 75,320 86 59 41 0 5/11/20 Overlay - AC Structural 8/1/12 101 1 CRESTA CT CREEKVIEW DR NORTH END AAC E E 160 33 7,657 86 100 0 0 11/22/23 Overlay - AC Structural 6/1/18 273 1 SHENANDOAH DR HIDDEN TRAIL RD SOUTH END AAC E A 550 41 22,289 87 49 44 7 11/26/23 Surface Treatment - Slurry Seal 6/1/18 103 1 DE SALLE ST MACKENZIE ST EARHART RD AAC E D 1,200 33 38,614 87 40 57 3 5/11/20 Overlay - AC Structural 8/1/12 112 1 EARHART RD BARENTS ST VELASQUEZ RD AAC E D 862 37 29,700 87 51 49 0 5/11/20 Overlay - AC Structural 8/1/12 233 2 PIKE RD MACKENZIE ST GRISSOM RD AAC E D 1,157 33 37,217 87 39 53 8 5/11/20 Overlay - AC Structural 8/1/12 243 1 PRESIDO DR EL DORADO DR CALIFIA DR AAC E D 490 36 18,476 87 50 50 0 4/8/22 Surface Treatment - Slurry Seal 6/1/18 295 1 SUNDOWNER DR RAPID FALLS RD NORTH END AAC E A 310 38 11,253 87 41 25 34 5/11/20 Overlay - AC Structural 8/1/12 325 1 WELLS FARGO DR CAJON DR MACKENZIE ST AAC E D 625 37 23,911 87 50 50 0 4/8/22 Surface Treatment - Slurry Seal 6/1/18 298 1 SYCAMORE LN McINTYRE ST WEST END AAC E D 110 27 2,739 87 91 0 9 12/1/23 Surface Treatment - Slurry Seal 6/1/18 121 1 EMPTY SADDLE DR NELLIE GAIL RD SPOTTED PONY LN AAC E A 1,880 36 55,789 88 81 19 0 11/30/23 Surface Treatment - Slurry Seal 6/1/18 1 1 ALAMEDA AVE DEL MONTE ST ALISO HILLS DR AAC E C 474 38 16,388 88 100 0 0 11/30/23 Overlay - AC Structural 7/1/11 59 1 BAUTISTA DR PADUA DR SOUTH END AAC E D 455 33 18,690 88 60 40 0 4/6/22 Surface Treatment - Slurry Seal 6/1/18 76 1 CAJON DR WELLS FARGO DR COSTEAU DR AAC E D 560 37 17,551 88 77 12 11 4/8/22 Surface Treatment - Slurry Seal 6/1/18 85 1 CEDARBLUFF TER WOODBLUFF RD EAST END AAC E A 845 35 30,342 88 40 60 0 4/7/22 Overlay - AC Structural 8/1/14 88 1 CHARLEMAGNE RD CHAMPLAIN RD DE SALLE ST AAC E D 535 33 17,196 88 70 30 0 5/11/20 Overlay - AC Structural 8/1/12 107 1 DERBY CIR WILKES PL WEST END AAC E E 490 37 18,044 88 54 46 0 4/6/22 Overlay - AC Structural 7/1/11

Page 6 of 11 ends
Page 508 of 570 ends

City of Laguna Hills, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, PCI Order (0-100)
Branch ID Sec ID Name From To Type Rank Zone L W Area PCI PCI Pct Climate PCI Pct Load PCI Pct Other Insp. Date Work Type Work Date 342 2 HIDDEN TRAIL RD PINESTRAP CIR DERBYHILL DR AAC E A 1,580 38 59,562 88 40 60 0 5/11/20 Overlay - AC Structural 8/1/12 172 1 LAS BOLSAS ST TASMAN RD GRISSOM RD AAC E D 1,830 33 60,223 88 54 46 0 5/11/20 Overlay - AC Structural 8/1/12 189 4 MACKENZIE ST CALIFIA DR COUTEAU DR AAC E D 1,542 37 54,141 88 98 2 0 4/6/22 Surface Treatment - Slurry Seal 6/1/18 207 1 MODOC DR PADUA DR SOUTH END AAC E D 475 37 19,389 88 76 0 24 4/6/22 Surface Treatment - Slurry Seal 6/1/18 217 1 NOTTINGHAM CT OSO PKWY DEVONSHIRE RD AAC E A 1,409 38 51,769 88 42 54 4 5/11/20 Overlay - AC Structural 8/1/12 217 2 NOTTINGHAM CT DEVONSHIRE RD BRADFORD LN AAC E A 899 38 32,249 88 76 19 5 5/11/20 Overlay - AC Structural 8/1/12 224 1 PADUA DR LA SUEN RD MACKENZIE ST AAC E D 885 36 31,702 88 60 40 0 4/6/22 Surface Treatment - Slurry Seal 6/1/18 248 1 RED LODGE PL NELLIE GAIL RD WEST END AAC E A 685 40 23,012 88 73 27 0 11/30/23 Surface Treatment - Slurry Seal 6/1/18 34 3 SAN REMO DR PALERMO SANTA MARIA AVE AC E F 539 32 16,095 88 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 301 1 TASMAN RD ERICSON WY VELASQUEZ RD AAC E D 985 33 31,308 88 94 0 6 4/6/22 Overlay - AC Fabric 8/1/14 145 4 GRISSOM RD MACKENZIE ST WEST END AAC E D 535 36 19,372 88 67 0 33 11/26/23 Surface Treatment - Slurry Seal 6/1/18 351 1 HEALTH CENTER DR PASEO DE VALENCIA CALLE DE LA LOUISA AC E E 760 20 24,915 88 100 0 0 12/4/23 New Construction - Initial 1/1/80 279 1 SORRELL PL BUCKSKIN DR EAST END AAC E B 280 34 11,593 88 100 0 0 11/26/23 Surface Treatment - Slurry Seal 11/1/21 339 1 YOLANDA ST EVA ST RAMONA ST AC E C 800 33 25,680 88 79 21 0 11/30/23 Surface Treatment - Slurry Seal 11/1/21 92 1 COACH SPRINGS LN HIDDEN TRAIL RD WEST END AAC E A 500 38 18,511 88 100 0 0 11/26/23 Patching - AC Deep 8/1/14 258 1 ROSA ST LUPITA ST NORTH END AC E C 560 36 19,984 89 100 0 0 11/26/23 Surface Treatment - Slurry Seal 11/1/21 70 1 BROKEN BIT LN BUCKSKIN DR SOUTH END AAC E B 785 36 29,498 89 80 20 0 11/26/23 Surface Treatment - Slurry Seal 11/1/21 351 2 HEALTH CENTER DR CALLE DE LA LOUISA PASEO DE VALENCIA AC E E 769 20 24,057 89 59 41 0 12/4/23 New Construction - Initial 1/1/80 220 2 ORELLANO WY ORELLANO WY END AAC E D 105 33 5,745 89 95 0 5 11/30/23 Overlay - AC Structural 7/1/14 64 1 BLACK HORSE LN LOST COLT DR EAST END AAC E A 850 36 30,715 89 52 48 0 5/11/20 Overlay - AC Structural 8/1/12 69 4 BRIDLEWOOD DR LAUREL CREST DR MEADOW CREST DR AAC E A 791 38 28,270 89 45 48 7 5/11/20 Overlay - AC Structural 8/1/12 168 1 LA SUEN RD CALIFIA DR PIKE RD AAC E D 1,000 36 39,176 89 83 0 17 4/6/22 Surface Treatment - Slurry Seal 6/1/18 189 1 MACKENZIE ST LA PAZ RD KNOTTY PINE RD AAC E D 888 33 30,465 89 88 0 12 4/8/22 Overlay - AC Fabric 8/1/14 189 3 MACKENZIE ST PIKE RD CALIFIA DR AAC E D 988 37 35,635 89 87 0 13 4/6/22 Surface Treatment - Slurry Seal 6/1/18 198 1 McINTYRE ST PIKE RD LA PAZ RD AAC E D 120 33 4,419 89 53 47 0 4/6/22 Surface Treatment - Slurry Seal 6/1/18 199 1 MEADOW CREST DR BRIDLEWOOD DR NORTH END AAC E A 625 36 23,545 89 55 45 0 5/11/20 Overlay - AC Structural 8/1/12 212 1 MT DIABLO RD GLEN CANYON DR SOUTH END AAC E B 1,300 36 46,307 89 76 24 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 34 1 SAN REMO DR TERAMO SANTA VITTORIA DR. AAC E F 1,100 32 34,543 89 98 2 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 313 1 VELASQUEZ RD TASMAN RD NORTHRUP DR AAC E D 610 33 20,363 89 97 0 3 4/6/22 Overlay - AC Fabric 8/1/14 52 1 APPALOOSA PL MUSTANG DR N CNR LA PAZ RD S CNR AAC E B 240 35 9,839 89 24 76 0 11/30/23 Surface Treatment - Slurry Seal 11/1/21 86 4 CHAMPLAIN RD CHAMPLAIN RD END AAC E D 114 33 6,073 90 100 0 0 11/26/23 Overlay - AC Structural 7/1/12 6 15 AVENIDA DE LA CARLOTA LOS ALISOS BL S CNR CHRISTINA CT N CNR AAC E E 155 34 5,652 90 100 0 0 12/4/23 Overlay - AC Structural 6/1/18 1 3 ALAMEDA AVE EL PRADO ST ELENA DR AAC E C 637 38 22,561 90 100 0 0 11/30/23 Overlay - AC Structural 7/1/11 56 1 BARBERA SANTA VITTORIA MARSALA AAC E F 303 39 9,707 90 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 56 2 BARBERA MARSALA PESARO AAC E F 1,179 39 42,593 90 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 62 1 BENTLEY LN ALICIA PKWY EAST END AAC E D 1,555 38 57,924 90 53 22 25 5/11/20 Overlay - AC Structural 8/1/12 69 2 BRIDLEWOOD DR OSO PKWY LAUREL CREST DR AAC E A 1,250 38 44,957 90 46 54 0 5/11/20 Overlay - AC Structural 8/1/12 93 1 COLONNA SORESINA PESARO AAC E F 570 35 19,350 90 73 27 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 183 3 LOST COLT DR BEARGRASS CIR NELLIE GAIL RD AAC E A 600 40 18,912 90 63 23 14 5/11/20 Overlay - AC Structural 8/1/12 187 1 LUPITA ST LOUISA ST EVA ST AC E C 600 33 19,313 90 78 22 0 11/22/23 Surface Treatment - Slurry Seal 11/1/21 189 2 MACKENZIE ST KNOTTY PINE RD LA PAZ RD AAC E D 919 37 31,724 90 82 18 0 4/8/22 Overlay - AC Fabric 8/1/14 196 1 MAVERICK CIR WESTRIDGE LN SOUTH END AAC E A 290 40 11,851 90 57 40 3 5/11/20 Overlay - AC Structural 8/1/12 209 1 MONTOVA MILANO END AAC E F 268 35 11,707 90 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 216 1 NORTHRUP DR VELASQUEZ RD LAS BOLSAS ST AAC E D 1,400 33 46,888 90 100 0 0 4/6/22 Overlay - AC Fabric 8/1/14 222 1 OVERLAND DR CAJON DR WEST END AAC E D 570 36 20,437 90 100 0 0 4/8/22 Surface Treatment - Slurry Seal 6/1/18 29 2 PERALTA DR ALCADE DR RIDGE ROUTE DR AAC E F 570 40 20,693 90 100 0 0 3/14/22 Surface Treatment - Slurry Seal 11/1/21 257 1 ROLLING HILLS RD WILLOW TREE LN WEST END AAC E A 515 33 17,948 90 100 0 0 4/7/22 Overlay - AC Structural 8/1/14 288 1 STAGELINE DR LOST COACH DR HIDDEN TRAIL RD AAC E A 1,820 38 68,144 90 97 0 3 4/8/22 Overlay - AC Structural 8/1/14 310 1 TREE TOP RD FIR LN EAST END AAC E D 930 37 35,023 90 55 21 24 5/11/20 Overlay - AC Structural 8/1/12 51 2 ANDREA ST LUPITA ST SOUTH END AC E C 269 39 11,066 90 100 0 0 11/26/23 Surface Treatment - Slurry Seal 11/1/21 185 1 LOUISA ST MOULTON PKWY WEST END AC E C 1,225 33 40,779 91 100 0 0 11/26/23 Surface Treatment - Slurry Seal 11/1/21 270 1 SARITA DR LINDA VISTA DR LA HABRA CT AC E C 222 33 10,570 91 98 0 2 11/30/23 New Construction - Initial 1/1/80 42 1 ADAMO SORESINA END AC E F 308 35 16,544 91 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 67 1 BOOTSTRAP PL GALLUP CIR WEST END AAC E B 175 44 8,026 91 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 68 1 BRADFORD LN NOTTINGHAM CT NORTH END AAC E A 225 41 7,108 91 49 45 6 5/11/20 Overlay - AC Structural 8/1/12 102 1 DAPPLE GREY DR NELLIE GAIL DR S CNR WILD VIEW TER AAC E B 667 34 21,927 91 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 104 2 DEL LAGO DR LA CADENA DR LAKE FOREST DR AAC E F 870 64 53,578 91 100 0 0 3/14/22 Surface Treatment - Slurry Seal 11/1/21 125 1 EUCALYPTUS DR WOODBLUFF RD EAST END AAC E A 340 32 11,189 91 56 41 3 4/7/22 Overlay - AC Structural 8/1/14 134 1 FLINTLOCK LN BRIDLEWOOD DR NORTH END AAC E B 1,015 36 35,808 91 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 139 1 GLEN CANYON DR NELLIE GAIL RD SOUTH END AAC E B 1,985 38 70,050 91 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 151 1 HILLARY LN BARENTS ST PASEO DE VALENCIA AAC E D 1,050 37 42,219 91 77 0 23 4/6/22 Overlay - AC Fabric 8/1/14 173 1 LAURAL CREST DR BRIDLEWOOD DR PATTERSON AAC E A 1,400 37 51,606 91 57 43 0 5/11/20 Overlay - AC Structural 8/1/12

Page 7 of 11 ends
Page 509 of 570 ends

City of Laguna Hills, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, PCI Order (0-100)
Branch ID Sec ID Name From To Type Rank Zone L W Area PCI PCI Pct Climate PCI Pct Load PCI Pct Other Insp. Date Work Type Work Date 204 1 MILANO TARANTO MONTOVA AAC E F 198 35 7,593 91 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 229 1 PATTERSON PL LAUREL CREST DR MOORE OAKS RD AAC E A 360 37 12,715 91 63 37 0 5/11/20 Overlay - AC Structural 8/1/12 282 1 SOUTHPORT CT SOUTHPORT ST NORTH END AAC E E 140 45 6,625 91 94 0 6 4/6/22 Overlay - AC Structural 7/1/11 289 1 STAGEWOOD CT STAGELINE DR NORTH END AAC E A 355 38 14,585 91 100 0 0 4/8/22 Overlay - AC Structural 8/1/14 308 1 TOMBSTONE RD OSO PKWY HITCHING RAIL RD AAC E B 315 20 6,913 91 45 55 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 40 1 VISTA GRANDE DR PERALTA DR END AAC E F 443 40 19,084 91 98 2 0 3/14/22 Surface Treatment - Slurry Seal 11/1/21 323 1 WATERWHEEL PL HITCHING RAIL RD EAST END AAC E B 390 38 15,558 91 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 329 1 WHITE OAKS DR LAUREL CREST DR SOUTH END AAC E A 950 33 35,751 91 100 0 0 4/7/22 Overlay - AC Structural 8/1/14 51 1 ANDREA ST LUPITA ST NORTH END AC E C 272 39 11,390 91 100 0 0 11/26/23 Surface Treatment - Slurry Seal 11/1/21 81 1 CARLSON CT LAUREL CREST DR EAST END AAC E A 135 33 7,131 92 66 0 34 12/1/23 Overlay - AC Structural 8/1/14 244 1 RAMONA ST YOLANDA ST ALICIA PKWY AC E C 475 31 15,789 92 100 0 0 11/22/23 Surface Treatment - Slurry Seal 11/1/21 41 1 ABILENE CIR HIDDEN TRAIL RD WEST END AAC E A 410 38 16,081 92 100 0 0 4/8/22 Overlay - AC Structural 8/1/14 43 1 ALCALDE DR VERDUGO DR PERALTA DR AAC E F 1,560 43 64,688 92 100 0 0 3/14/22 Surface Treatment - Slurry Seal 11/1/21 63 1 BIANCO MARSALA END AAC E F 348 35 15,781 92 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 75 2 CADILLAC DR BOONE PL HILLARY LN AAC E D 422 33 13,391 92 90 0 10 4/6/22 Overlay - AC Fabric 8/1/14 82 1 CARMEL ST SOUTH END NORTH END AC E C 865 35 32,519 92 100 0 0 11/22/23 Surface Treatment - Slurry Seal 11/1/21 86 1 CHAMPLAIN RD EARHART RD VESPUCCI RD AAC E D 830 35 23,057 92 73 27 0 5/11/20 Overlay - AC Structural 8/1/12 102 2 DAPPLE GREY DR WILD VIEW TER NELLIE GAIL RD AAC E B 1,624 34 54,591 92 100 0 0 3/16/22 Overlay - AC Structural 7/1/11 104 1 DEL LAGO DR ALCALDE DR LA CADENA DR AAC E F 1,160 44 47,409 92 100 0 0 3/14/22 Surface Treatment - Slurry Seal 11/1/21 110 1 DEVONSHIRE RD FALLING LEAF DR NOTTINGHAM CT AAC E A 900 37 33,429 92 88 0 12 5/11/20 Overlay - AC Structural 8/1/12 112 2 EARHART RD DE SALLE DR CHAMPLAIN RD AAC E D 485 33 16,756 92 72 28 0 5/11/20 Overlay - AC Structural 8/1/12 116 2 EL PACIFICO DR MOULTON PKWY VERDUGO DR AAC E F 300 64 18,126 92 100 0 0 3/14/22 Surface Treatment - Slurry Seal 11/1/21 132 1 FIR LN EVERGREEN RD TREE TOP RD AAC E D 250 37 11,957 92 71 29 0 5/11/20 Overlay - AC Structural 8/1/12 137 1 GENOVA PALERMO END AAC E F 562 35 23,671 92 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 14 1 GREENFIELD DR SR 73 RAMPS HIDDEN TRAIL RD AAC E A 794 38 32,549 92 89 0 11 5/11/20 Overlay - AC Structural 8/1/12 342 1 HIDDEN TRAIL RD GREENFIELD DR PINESTRAP CIR AAC E A 1,612 38 61,892 92 65 32 3 5/11/20 Overlay - AC Structural 8/1/12 17 1 LA CADENA DR PERALTA DR DEL LAGO DR AAC E F 541 40 22,248 92 100 0 0 3/14/22 Surface Treatment - Slurry Seal 11/1/21 17 2 LA CADENA DR VERDUGO DR DEL LAGO DR AAC E F 709 40 29,708 92 100 0 0 3/14/22 Surface Treatment - Slurry Seal 11/1/21 177 1 LOMBARDI PASERO END AAC E F 315 35 13,789 92 44 56 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 179 1 LONE PINE CIR HIDDEN TRAIL RD EAST END AAC E A 340 38 13,691 92 93 0 7 4/8/22 Overlay - AC Structural 8/1/14 210 1 MOORE OAKS RD DEVONSHIRE RD NORTH END AAC E A 690 33 25,602 92 88 0 12 5/11/20 Overlay - AC Structural 8/1/12 213 1 MUSTANG DR NELLIE GAIL RD FARRIER AAC E B 648 39 23,933 92 100 0 0 3/16/22 Overlay - AC Structural 7/1/11 213 2 MUSTANG DR FARRIER APPALOOSA PL AAC E B 1,372 39 51,031 92 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 218 1 OAK HOLLOW RD ELM BANK DR NORTH END AAC E A 180 38 8,035 92 100 0 0 4/7/22 Overlay - AC Structural 8/1/14 226 1 PALERMO SAN REMO DR TARANTO AAC E F 964 35 31,074 92 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 230 1 PECOS RD HITCHING RAIL RD WEST END AAC E B 1,220 36 43,924 92 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 242 1 PRAIRESTONE DR NELLIE GAIL RD HITCHING RAIL RD AAC E B 1,525 39 53,006 92 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 34 2 SAN REMO DR PESARO TERAMO AAC E F 612 32 19,837 92 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 300 2 TARANTO TREVISO VENISIA AAC E F 803 35 27,905 92 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 302 1 TERAMO SAN REMO MARSALA AAC E F 747 39 27,343 92 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 303 1 TERNI SORESINA END AAC E F 330 35 12,025 92 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 38 1 TERRA DR LA CADENA DR END AAC E F 158 40 8,474 92 100 0 0 3/14/22 Surface Treatment - Slurry Seal 11/1/21 309 1 TORINO TARANTO TORINO AAC E F 252 35 7,054 92 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 39 1 VERDUGO DR LA CADENA DR EL PACIFICO DR AAC E F 587 36 23,434 92 100 0 0 3/14/22 Surface Treatment - Slurry Seal 11/1/21 317 1 VESPUCCI RD CHAMPLAIN RD DE SALLE ST AAC E D 160 33 6,456 92 96 0 4 5/11/20 Overlay - AC Structural 8/1/12 317 2 VESPUCCI RD LAS BOLSAS ST VELASQUEZ RD AAC E D 1,055 33 34,292 92 84 0 16 4/6/22 Overlay - AC Fabric 8/1/14 330 1 WILD VIEW TER DAPPLE GREY DR SOUTH END AAC E B 410 38 16,974 92 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 334 1 WOOD BLUFF RD VISTA VIEJO ELDERBROOK LN AAC E A 1,142 37 40,496 92 67 33 0 5/11/20 Overlay - AC Structural 8/1/12 338 2 WOOLWICH ST WOOLWICH CT WILKES PL AAC E E 1,030 32 33,087 92 100 0 0 4/6/22 Overlay - AC Structural 7/1/11 50 1 ANCONA TREVISO END AAC E F 306 35 18,073 93 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 58 1 BARKSTONE LN VISTA VIEJO NORTH END AAC E A 660 36 23,809 93 96 0 4 4/7/22 Overlay - AC Structural 8/1/14 69 6 BRIDLEWOOD DR MEADOW CREST DR VISTA VIEJO AAC E A 1,476 38 53,923 93 65 35 0 5/11/20 Overlay - AC Structural 8/1/12 72 1 BUCKLESTONE CT NELLIE GAIL RD NORTH END AAC E B 350 39 14,001 93 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 84 1 CATANIA CREMONA END AAC E F 255 35 10,506 93 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 87 1 CHAPARREL PL NELLIE GAIL RD SOUTH END AAC E B 155 46 8,681 93 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 100 1 CREMONA TARANTO END AAC E F 319 35 13,106 93 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 116 1 EL PACIFICO DR VERDUGO DR END AAC E F 235 43 13,362 93 100 0 0 3/14/22 Surface Treatment - Slurry Seal 11/1/21 348 1 ELDERBROOK LN WOODBLUFF RD SOUTH END AAC E A 160 33 7,705 93 100 0 0 4/7/22 Overlay - AC Structural 8/1/14 130 1 FALLING LEAF DR DEVONSHIRE RD WOODBLUFF RD AAC E A 1,670 37 60,018 93 84 0 16 4/7/22 Overlay - AC Structural 8/1/14 133 1 FLETCHER PL LAUREL CREST DR EAST END AAC E A 270 40 11,011 93 96 0 4 4/7/22 Overlay - AC Structural 8/1/14 135 1 FORMELLO BARBERA END AAC E F 378 35 15,607 93 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 143 1 GRAVINO PESARO END AAC E F 280 35 12,328 93 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21

Page 8 of 11 ends
Page 510 of 570 ends

City of Laguna Hills, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, PCI Order (0-100)
Branch ID Sec ID Name From To Type Rank Zone L W Area PCI PCI Pct Climate PCI Pct Load PCI Pct Other Insp. Date Work Type Work Date 144 1 GRISSOM CIR HILLARY LN WEST END AAC E D 120 47 6,001 93 100 0 0 4/6/22 Overlay - AC Structural 7/1/14 147 1 HARTOG ST VELASQUEZ RD LAS BOLSAS ST AAC E D 875 31 26,627 93 60 34 6 4/6/22 Overlay - AC Fabric 8/1/14 149 1 HIGHPLAINS TER GLEN CANYON DR EAST END AAC E B 515 37 19,710 93 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 176 1 LIPARI TERAMO END AAC E F 368 35 17,337 93 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 191 1 MAGNOLIA CT FALLING LEAF DR SOUTH END AAC E A 555 33 20,100 93 92 0 8 4/7/22 Overlay - AC Structural 8/1/14 195 1 MARSALA BARBERA END AAC E F 967 39 35,878 93 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 197 2 MAWSON DR VELASQUEZ RD LAS BOLSAS ST AAC E D 1,063 33 33,399 93 93 0 7 4/6/22 Overlay - AC Fabric 8/1/14 198 2 McINTYRE ST LA PAZ RD EVERGREEN RD AAC E D 1,500 37 54,783 93 68 32 0 5/11/20 Overlay - AC Structural 8/1/12 202 1 MESSINA COLONNA END AAC E F 226 35 9,627 93 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 206 1 MODINA FORMELLO END AAC E F 296 35 14,059 93 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 214 1 NAPOLI PALERMO END AAC E F 495 35 18,566 93 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 25 2 NELLIE GAIL RD DAPPLE GREY DR BUCKBOARD LN AAC E B 470 38 18,795 93 75 0 25 3/16/22 Crack Sealing - AC 2/12/08 221 1 OROVILLE PL MT DIABLO RD SOUTH END AAC E B 605 37 24,466 93 66 34 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 29 1 PERALTA DR LA CADENA DR ALCALDE DR AAC E F 1,346 40 53,502 93 100 0 0 3/14/22 Surface Treatment - Slurry Seal 11/1/21 232 1 PESARO SAN REMO DR END AAC E F 850 42 32,684 93 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 262 1 SAN DONA GENOVA END AAC E F 312 35 14,257 93 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 272 1 SAVONA BARBERA END AAC E E 284 35 14,601 93 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 274 1 SHERIFF RD NELLIE GAIL RD EAST END AAC E B 775 36 30,529 93 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 278 1 SORESINA TERAMO ADAMO AAC E F 655 35 21,921 93 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 300 1 TARANTO VENISIA SAN REMO DR AAC E F 902 35 19,565 93 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 309 2 TORINO WEST END EAST END AAC E F 298 35 20,018 93 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 39 2 VERDUGO DR ALCALDE DR EL PACIFICO DR AAC E F 560 36 22,708 93 100 0 0 3/14/22 Surface Treatment - Slurry Seal 11/1/21 335 1 WOOD BROOK RD LAUREL CREST WEST END AAC E A 465 33 17,329 93 73 0 27 4/7/22 Overlay - AC Structural 8/1/14 49 1 ANADALE DR VISTA VIEJO N CNR NORTH END AAC E A 890 35 31,942 94 85 0 15 4/7/22 Overlay - AC Structural 8/1/14 9 1 COMMERCE CENTER DR AVE DE LA CARLOTA END AAC E F 983 46 42,461 94 100 0 0 3/14/22 Surface Treatment - Slurry Seal 11/1/21 108 1 DERBYHILL DR HIDDEN TRAIL RD WEST END AAC E A 1,140 38 45,235 94 100 0 0 4/8/22 Overlay - AC Structural 8/1/14 120 1 ELM BANK DR DEVONSHIRE RD WEST END AAC E A 510 37 18,896 94 95 0 5 4/7/22 Overlay - AC Structural 8/1/14 141 1 GOLDEN ROD CIR MAGNOLIA CT EAST END AAC E A 85 63 5,132 94 100 0 0 4/7/22 Overlay - AC Structural 8/1/14 346 1 GREEN HILLS LN WOODBLUFF RD RAIN TREE RD AAC E A 597 33 18,373 94 100 0 0 4/7/22 Overlay - AC Structural 8/1/14 146 1 HARRINGTON CT NOTTINGHAM CT NORTH END AAC E A 395 38 15,142 94 86 0 14 4/7/22 Overlay - AC Structural 8/1/14 193 1 MAPLE VIEW DR LAUREL CREST DR WEST END AAC E A 580 36 21,015 94 91 0 9 4/7/22 Overlay - AC Structural 8/1/14 197 1 MAWSON DR WILKES PL VELASQUEZ RD AAC E D 911 33 29,519 94 89 0 11 4/6/22 Overlay - AC Fabric 8/1/14 213 3 MUSTANG DR APPALOOSA PL BUCKSKIN DR AAC E B 1,417 39 53,199 94 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 223 1 PADOVA MARSALA END AAC E F 268 35 12,620 94 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 234 1 PINE NUT RD TREE TOP RD PASEO DE VALENCIA AAC E D 120 37 5,110 94 89 0 11 5/11/20 Overlay - AC Structural 8/1/12 245 1 RANGEWOOD RD GALLUP CIR EAST END AAC E B 1,290 36 46,135 94 100 0 0 3/16/22 Overlay - AC Structural 7/1/11 247 1 RED CORRAL RD NELLIE GAIL RD HORSESHOE AAC E B 1,370 34 44,839 94 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 251 1 RIMINI SAN REMO DR END AAC E F 250 35 10,483 94 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 286 1 SPUR BRANCH LN HITCHING RAIL RD EAST END AAC E B 760 36 28,184 94 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 311 1 TREVISO NAPOLI END AAC E F 425 35 10,508 94 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 313 4 VELASQUEZ RD TASMAN RD COSTEAU DR AAC E D 260 33 8,983 94 100 0 0 4/6/22 Overlay - AC Fabric 8/1/14 314 1 VENISIA TARANTO END AAC E F 287 35 11,383 94 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 331 2 WILKES PL GRISSOM RD ALICIA PKWY AAC E D 1,125 33 37,401 94 100 0 0 4/6/22 Overlay - AC Fabric 8/1/14 334 2 WOOD BLUFF RD ELDERBROOK LN FALLING LEAF DR AAC E A 1,902 37 70,544 94 94 0 6 4/7/22 Overlay - AC Structural 8/1/14 47 1 AMALIA ST YOLANDA ST CARMEL ST AC E C 210 33 6,787 95 100 0 0 11/22/23 Surface Treatment - Slurry Seal 11/1/21 345 1 ANVIL CIR FARRIER CIR NORTH END AAC E B 707 33 28,842 95 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 57 2 BARENTS ST WILKES PL HILLARY LN AAC E D 135 33 4,764 95 100 0 0 4/6/22 Overlay - AC Fabric 8/1/14 69 1 BRIDLEWOOD DR FLINTLOCK LN NELLIE GAIL RD AAC E B 490 39 17,957 95 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 69 5 BRIDLEWOOD DR SADDLE ROCK PL FLINTLOCK LN AAC E B 755 41 27,758 95 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 129 1 FAIRCOURT LN WOODBLUFF RD EAST END AAC E A 565 36 21,572 95 100 0 0 4/7/22 Overlay - AC Structural 8/1/14 136 1 GALLUP CIR LA PAZ RD RANGEWOOD RD AAC E B 1,908 39 70,021 95 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 136 2 GALLUP CIR RANGEWOOD RD NELLIE GAIL RD AAC E B 1,034 37 38,328 95 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 139 2 GLEN CANYON DR BRIDLEWOOD DR END AAC E B 146 33 7,105 95 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 145 3 GRISSOM RD LAS BOLSAS ST WILKES PL AAC E D 1,785 33 57,687 95 85 4 11 4/6/22 Overlay - AC Fabric 8/1/14 152 3 HITCHING RAIL RD TOMBSTONE RD PRIARESTONE DR AAC E B 1,410 39 59,753 95 100 0 0 3/16/22 Overlay - AC Structural 7/1/11 155 1 IRONWOOD DR GREEN HILLS LN MIDDLERIDGE LN AAC E A 900 33 31,745 95 100 0 0 4/7/22 Overlay - AC Structural 8/1/14 203 1 MIDDLERIDGE LN IRONWOOD DR WOODBLUFF RD AAC E A 235 33 5,944 95 100 0 0 4/7/22 Overlay - AC Structural 8/1/14 25 4 NELLIE GAIL RD CHAPARRAL PL HOUSTON TR AAC E B 593 38 22,731 95 100 0 0 3/16/22 Crack Sealing - AC 2/12/08 25 9 NELLIE GAIL RD MUSTANG DR BRIDLEWOOD DR AAC E B 409 38 15,544 95 54 46 0 3/16/22 Crack Sealing - AC 2/12/08 31 1 PLAZA POINTE DR AVENIDA DE LA CARLOTA SOUTH POINTE DR AAC E F 895 35 35,210 95 100 0 0 3/14/22 Surface Treatment - Slurry Seal 11/1/21 239 1 POINTSETTIA CT WOOD BROOD RD NORTH END AAC E A 150 33 7,038 95 87 0 13 4/7/22 Overlay - AC Structural 8/1/14 347 1 RAIN TREE RD GREEN HILLS LN EAST END AAC E A 646 33 25,006 95 93 0 7 4/7/22 Overlay - AC Structural 8/1/14

Page 9 of 11 ends
Page 511 of 570 ends

City of Laguna Hills, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, PCI Order (0-100)
Branch ID Sec ID Name From To Type Rank Zone L W Area PCI PCI Pct Climate PCI Pct Load PCI Pct Other Insp. Date Work Type Work Date 247 2 RED CORRAL RD HORSESHOE MUSTANG DR AAC E B 1,003 34 32,473 95 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 249 1 RICH SPRINGS CIR HITCHING RAIL RD WEST END AAC E B 175 44 8,147 95 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 260 1 SADDLEROCK PL BRIDLEWOOD DR WEST END AAC E B 540 37 20,465 95 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 35 2 SOUTH POINTE DR PLAZA POINTE DR PERALTA RD AAC E F 871 40 33,739 95 100 0 0 3/14/22 Surface Treatment - Slurry Seal 11/1/21 292 1 STRATFORD PL NOTTINGHAM PL NORTH END AAC E A 265 40 10,707 95 93 0 7 4/7/22 Overlay - AC Structural 8/1/14 316 1 VERONA TARANTO END AAC E F 328 35 14,216 95 100 0 0 4/7/22 Surface Treatment - Slurry Seal 11/1/21 332 1 WILLOW TREE LN FALLING LEAF DR ROLLING HILLS RD AAC E A 275 33 11,023 95 100 0 0 4/7/22 Overlay - AC Structural 8/1/14 126 1 EVA ST LUPITA ST YOLANDA ST AC E C 950 33 32,987 95 100 0 0 11/22/23 Surface Treatment - Slurry Seal 11/1/21 152 1 HITCHING RAIL RD PRIARESTONE DR NELLIE GAIL RD AAC E B 1,150 39 44,158 96 100 0 0 3/16/22 Overlay - AC Structural 7/1/11 25 1 NELLIE GAIL RD OSO PKWY DAPPLE GREY DR AAC E B 468 24 17,591 96 54 0 46 3/16/22 Crack Sealing - AC 2/12/08 25 18 NELLIE GAIL RD SHERIFF RD PRAIRIESTONE DR AAC E B 704 38 25,935 96 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 25 19 NELLIE GAIL RD BUCKLESTONE CT SHERIFF RD AAC E B 849 38 31,480 96 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 25 21 NELLIE GAIL RD NELLIE GAIL RD RED CORRAL AAC E B 665 38 24,728 96 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 25 5 NELLIE GAIL RD PRAIRIESTONE DR GLEN CANYON DR AAC E B 714 38 27,037 96 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 25 8 NELLIE GAIL RD HOUSTON TR MUSTANG DR AAC E B 492 38 17,973 96 100 0 0 3/16/22 Crack Sealing - AC 2/12/08 112 6 EARHART RD EARHART RD SOUTH END AAC E D 118 33 6,192 96 100 0 0 4/6/22 Overlay - AC Fabric 8/1/14 109 1 DESERT TRAIL NELLIE GAIL DR SOUTH END AAC E B 525 37 19,628 97 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 25 20 NELLIE GAIL RD BUCKLESTONE CT CABOT RD AAC E B 758 38 29,011 97 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 25 3 NELLIE GAIL RD BUCKBOARD LN CHAPARRAL PL AAC E B 1,284 38 47,504 97 100 0 0 3/16/22 Crack Sealing - AC 2/12/08 25 6 NELLIE GAIL RD RED CORRAL RD GALLUP CIR AAC E B 854 38 30,993 97 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 35 1 SOUTH POINTE DR PLAZA POINTE DR END AAC E F 487 40 21,196 97 100 0 0 3/14/22 Surface Treatment - Slurry Seal 11/1/21 344 1 FARRIER CIR MUSTANG DR NORTH END AAC E B 571 33 22,482 98 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 152 2 HITCHING RAIL RD CABOT RD TOMBSTONE RD AAC E B 430 39 15,589 98 100 0 0 3/16/22 Overlay - AC Structural 7/1/07 343 1 HORSESHOE CIR RED CORRAL RD SOUTH END AAC E B 396 33 16,167 98 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 154 1 HOUSTON TRAIL NELLIE GAIL RD SOUTH END AAC E B 860 36 31,566 98 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 25 7 NELLIE GAIL RD GLEN CANYON DR GALLUP CIR AAC E B 575 38 22,910 98 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 240 1 POKER FLATS PL NELLIE GAIL RD NORTH END AAC E B 310 40 12,786 98 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 69 3 BRIDLEWOOD DR OSO PKWY SADDLE ROCK PL AAC E B 220 36 8,796 99 100 0 0 3/16/22 Surface Treatment - Slurry Seal 11/1/21 44 1 ALISAL AVE SARITA DR LINDA VISTA DR AAC E C 970 33 31,319 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 44 2 ALISAL AVE LINDA VISTA DR PASEO DE VALENCIA AAC E C 120 37 4,532 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 45 1 ALTA LOMA CT SANTA ROSA AVE EAST END AAC E C 460 37 18,714 100 0 0 0 1/1/20 Overlay - AC Fabric 1/1/20 46 1 ALTA MIRA DR ALEMEDA AVE BUENA VISTA DR AAC E C 400 37 14,174 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 48 1 ANACAPA ST SAN PEDRO AVE EL PRADO ST AAC E C 770 33 24,949 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 53 1 ASHLAND DR KENNINGTON DR WEYBURN DR AAC E E 1,175 37 43,309 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 55 1 AVENIDA AVALON VIA BALBOA SOUTH END AAC E E 210 33 8,692 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 61 1 BECKENHAM ST PASEO DE VALENCIA ACACIA LN AAC E E 1,063 36 35,267 100 0 0 0 1/1/20 Overlay - AC Fabric 1/1/20 61 2 BECKENHAM ST ACACIA LN WILKES PL AAC E E 591 36 18,845 100 0 0 0 1/1/20 Overlay - AC Fabric 1/1/20 73 1 BUCKSKIN DR NELLIE GAIL RD SILVER SADDLE LN AAC E B 1,329 39 49,275 100 0 0 0 11/1/21 Overlay - AC Structural 11/1/21 73 2 BUCKSKIN DR SILVER SADDLE LN MUSTANG DR AAC E B 904 39 33,689 100 0 0 0 11/1/21 Overlay - AC Structural 11/1/21 73 3 BUCKSKIN DR MUSTANG DR BUCKBOARD LN AAC E B 1,001 39 38,062 100 0 0 0 11/1/21 Overlay - AC Structural 11/1/21 74 1 BUENA VISTA DR LOS GATOS DR NORTH END AAC E C 1,130 38 43,072 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 77 1 CALERO AVE LA MIRADA ST EL CONEJO LN AAC E C 290 33 10,417 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 79 1 CALLE CARMEL HENDON ST SOUTH END AAC E E 570 26 16,440 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 83 1 CAROL LN JULIE AVE EAST END AAC E E 430 37 16,227 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 91 1 CLARINGTON DR WEYBURN DR KENNINGTON DR AAC E E 1,265 37 46,953 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 98 1 CREEK DR LINDA VISTA DR SOUTH END AAC E C 780 35 27,774 100 0 0 0 1/1/20 Overlay - AC Fabric 1/1/20 105 1 DEL MONTE ST ALAMEDA AVE LA CUESTA AVE AAC E C 950 37 34,363 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 114 1 EL CONEJO LN LINDA VISTA DR CALERO AVE AAC E C 930 33 29,817 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 117 1 EL PRADO ST ALAMEDA AVE SAN PEDRO AVE AAC E C 810 37 29,382 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 118 1 EL SEGUNDO ST ALISO HILLS DR NORTH END AAC E C 570 36 21,362 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 119 1 ELENA DR LOS GATOS DR ALAMEDA AVE AAC E C 535 37 21,634 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 124 1 ERNESTINE CT LINDA FLORA ST NORTH END AAC E C 475 37 17,443 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 142 1 GORDON RD MOULTON PKWY IMPERIAL DR AAC E C 450 37 18,217 100 0 0 0 8/31/21 Overlay - AC Structural 8/31/21 148 2 HENDON ST CAMBERWELL ST CALLE CARMEL AAC E E 500 37 19,577 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 15 3 HON AVE CAMBERWELL ST GEORGIA SUE AAC E E 1,482 33 57,324 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 156 1 JORIE DR WEYBURN DR GEORGIA SUE AAC E E 490 37 19,881 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 157 1 JULIE AVE HON AVE SARA LN AAC E E 740 37 26,227 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 158 1 KATIE AVE JULIE AVE EAST END AAC E E 435 37 16,218 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 159 1 KENNINGTON DR PASEO DE VALENCIA CLARINGTON DR AAC E E 200 37 7,798 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 160 1 KIM CIR GEORGIA SUE DR SOUTH END AAC E E 450 37 16,924 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 163 1 LA CIENEGA ST RIO GRANDE AVE SIERRA BONITA DR AAC E C 1,160 37 39,372 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 163 2 LA CIENEGA ST LA CIENEGA ST ALISO HILLS DR AAC E C 130 37 4,993 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20

Page 10 of 11 ends
Page 512 of 570 ends

City of Laguna Hills, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, PCI Order (0-100)
Branch ID Sec ID Name From To Type Rank Zone L W Area PCI PCI Pct Climate PCI Pct Load PCI Pct Other Insp. Date Work Type Work Date 164 1 LA CUESTA AVE TERRA BELLA AVE SAUSALITO ST AAC E C 1,350 33 45,043 100 0 0 0 1/1/20 Overlay - AC Fabric 1/1/20 165 1 LA HABRA CT SARITA DR EAST END AAC E C 330 33 12,657 100 0 0 0 1/1/20 Overlay - AC Fabric 1/1/20 166 1 LA MIRADA ST ALISAL LN LINDA VISTA DR AAC E C 1,375 33 44,926 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 174 1 LINDA FLORA ST EAST END EL SEGUNDO ST AAC E C 890 35 32,775 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 180 1 LOS ALAMITOS AVE MONTE ROYALE ST MANDEVILLE DR AAC E C 1,215 37 44,918 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 181 1 LOS CERROS ST LA CIENEGA ST SOUTH END AAC E C 230 33 10,124 100 0 0 0 1/1/20 Overlay - AC Fabric 1/1/20 182 1 LOS GATOS DR BUENA VISTA DR WEST END AAC E C 490 39 19,961 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 188 1 LUTON ST CAMBERWELL ST EAST END AAC E E 380 38 14,203 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 194 1 MARIN CT EL CAPITAN LN SOUTH END AAC E C 205 33 8,720 100 0 0 0 1/1/20 Overlay - AC Fabric 1/1/20 200 1 MENDOCINO AVE ALISO HILLS DR MENDOCINO CT AAC E C 130 36 4,250 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 201 1 MENDOCINO CT WEST END EAST OF MENDOCINO AVE AAC E C 1,080 37 40,736 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 22 1 MILL CREEK DR LAKE FOREST DR NORTH END OF BRIDGE AAC E F 1,064 40 36,606 100 88 0 12 4/7/22 Overlay - AC Structural 11/1/21 22 2 MILL CREEK DR SOUTH END OF BRIDGE RIDGE ROUTE DR AAC E F 2,703 40 106,442 100 84 5 11 4/7/22 Overlay - AC Structural 11/1/21 22 2 MILL CREEK DR SOUTH END OF BRIDGE RIDGE ROUTE DR AAC E F 2,703 40 106,442 100 84 5 11 4/7/22 Surface Treatment - Slurry Seal 11/1/21 211 1 MORRO CT TERRA BELLA AVE WEST END AAC E C 230 33 9,463 100 0 0 0 1/1/20 Overlay - AC Fabric 1/1/20 215 1 NATAMA CT TERRA BELLA AVE WEST END AAC E C 210 33 8,952 100 0 0 0 1/1/20 Overlay - AC Fabric 1/1/20 225 1 PAIGE CIR GEORGIA SUE DR SOUTH END AAC E E 675 37 25,189 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 241 1 PONCE CT LINDA VISTA DR SOUTH END AAC E C 205 33 9,101 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 252 1 RIO GRANDE AVE TALEGA AVE LA CIENEGA ST AAC E C 880 37 36,441 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 253 1 RITTEN HOUSE CIR ASHLAND DR NORTH END AAC E E 420 37 15,801 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 263 1 SAN PEDRO AVE ANACAPA ST TALEGA AVE AAC E C 625 33 24,255 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 265 1 SANDIA CT TERRA BELLA AVE NORTH END AAC E C 425 37 18,023 100 0 0 0 1/1/20 Overlay - AC Fabric 1/1/20 267 1 SANTA ROSA AVE MANDEVILLE DR SUNDANCE AVE AAC E C 690 37 25,787 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 269 1 SARA LN PAIGE CIR EAST END AAC E E 650 38 24,235 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 270 2 SARITA DR LA HABRA CT ALISAL LN AAC E C 445 33 13,947 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 275 1 SIERRA BONITA DR LA CIENEGA ST ALISO HILLS DR AAC E C 140 42 8,516 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 277 1 SOLANO CT ALAMEDA AVE EAST END AAC E C 245 40 10,152 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 291 1 STOCKPORT ST WILKES PL FIRE GATE AAC E E 635 36 22,465 100 0 0 0 1/1/20 Overlay - AC Fabric 1/1/20 291 2 STOCKPORT ST PASEO DE VALENCIA FIRE GATE AAC E E 570 35 19,251 100 0 0 0 1/1/20 Overlay - AC Fabric 1/1/20 293 1 SUNBURST AVE PASEO DE VALENCIA LARGO DR AAC E C 120 37 4,222 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 294 1 SUNDANCE AVE SANTA ROSA AVE LOS ALAMITOS AVE AAC E C 420 37 16,235 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 296 1 SUNSET PL (E & W LOOP) BECKENHAM ST SUNSET PL AAC E E 172 34 4,964 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 296 2 SUNSET PL (E & W LOOP) SUNSET PL SUNSET PL WEST AAC E E 768 34 26,414 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 296 3 SUNSET PL (E & W LOOP) SUNSET PL SUNSET PL EAST AAC E E 853 34 30,690 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 299 1 TALEGA AVE SAN PEDRO AVE ALAMEDA AVE AAC E C 875 37 30,496 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 304 1 TERRA BELLA AVE ALISO HILLS DR MORRO CT AAC E C 1,204 38 42,065 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 304 2 TERRA BELLA AVE MORRO CT SOUTH END AAC E C 883 38 33,426 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 306 1 TOCALOMA CT ALAMEDA AVE EAST END AAC E C 575 29 17,375 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 307 1 TOLUCA CT LINDA FLORA ST NORTH END AAC E C 410 37 15,449 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 318 1 VIA BALBOA CALLE CARMEL END AAC E E 300 33 11,112 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 327 1 WEYBURN DR ASHLAND DR EAST END AAC E E 770 37 27,632 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20 331 1 WILKES PL ALICIA PKWY NW to FIRE GATE AAC E E 1,560 36 56,464 100 0 0 0 1/1/20 Overlay - AC Fabric 1/1/20 341 1 ZUMAYA CT WEST END BUENA VISTA DR AAC E C 470 37 17,010 100 0 0 0 1/1/20 Overlay - AC Structural 1/1/20

63.7 12,189,130

Page 11 of 11 ends
← All documents from this meeting