1Special
Next Resolution No. 2023-15
Next Ordinance No. 855
AGENDA
REGULAR MEETING
LOMITA CITY COUNCIL
TUESDAY, JUNE 20, 2023
6:00 P.M.
THE CITY COUNCIL HAS RESUMED PUBLIC MEETINGS IN THE COUNCIL CHAMBERS.
PARTICIPATION BY MEMBERS OF THE PUBLIC IS ONLY GUARANTEED VIA IN-PERSON ATTENDANCE.
AS A COURTESY, THE CITY WILL ATTEMPT TO ALSO ALLOW PUBLIC PARTICIPATION
DURING THE MEETING VIA A COMPUTER OR SMART DEVICE USING THE FOLLOWING ZOOM LINK:
https://us02web.zoom.us/j/83306576837
Telephone Option: (669)-900-6833 Meeting ID: 833 0657 6837 Please note that the City cannot, and does not, guarantee that the above Zoom link or dial in feature will work, that any individual commenter’s computer or smart device will operate without issue, or that the City’s hosting of the Zoom will work without issue. Members of the public acknowledge this and are on notice that public participation is only guaranteed via attendance in Council Chambers and that the Zoom option is provided as a courtesy only. Technological issues or failure of the Zoom link to be operational for any reason will not result in any pause, recess, or cancellation of the meeting.
If you wish to provide public comment during oral communications or for a particular agenda item, you may either contact the City Clerk’s Office before the meeting, at 310-325-7110 ext. 141, complete a speaker card and give it to the City Clerk or if participating via Zoom utilize the “raise hand” function to join the queue to speak when the Mayor calls the item for discussion. Your name and city of residency is requested, but not required.
No meeting of the Lomita Public Financing Authority will be held on this date.
LOMITA CITY HALL
COUNCIL CHAMBERS
24300 Narbonne Avenue
Lomita, CA 90717
Phone: (310) 325-7110
Fax: (310) 325-4024
Barry Waite, Mayor
Bill Uphoff, Mayor Pro Tem
James Gazeley, Council Member
Cindy Segawa, Council Member
Mark A. Waronek, Council Member
Reg CC Mtg, June 20, 2023, Page #1
Lomita City Council Meeting Agenda June 20, 2023
1. OPENING CEREMONIES
a. Call Meeting to Order
b. Flag Salute
c. Invocation – Council Member Waronek
d. Roll Call
e. Closed Session Report – City Attorney Rusin
2. APPROVAL OF AGENDA
3. PRESENTATIONS
• CERTIFICATES OF RECOGNITION PRESENTED TO THE DRUG FREE/GANG FREE
WALK POSTER CONTEST WINNERS
• CERTIFICATES OF RECOGNITION PRESENTED TO THE DRUG FREE/GANG FREE
WALK SPONSORS
• CERTIFICATES OF RECOGNITION PRESENTED TO RETIRING TEACHERS
4. ORAL COMMUNICATIONS
Persons wishing to speak on Consent Agenda items or subjects other than those scheduled are requested to do so at this time. In order to conduct a timely meeting, a three (3) minute time limit per person has been established. Government Code Section 54954.2 prohibits the Council from discussing or taking action on a specific item unless it appears on a posted agenda.
5. ORAL COMMUNICATIONS AND MEETING ATTENDANCE REPORTS FROM THE
CITY COUNCIL
The City Council may discuss and act upon items described under Council comments; however, items which are not on the agenda will be limited to Council reports, announcements, requests for clarification or factual information, or placement of matters on the agenda for a future meeting.
6. CITY MANAGER’S REPORT (information only)
7. CONSENT AGENDA
All items under the Consent Agenda are considered by the Council to be routine and will be enacted by one motion in the form listed below. There may be separate discussions of these items prior to the time the Council votes on the motion. Specific items may be removed from the Consent Agenda at the request of any Council Member or staff.
RECOMMENDED ACTION: That Consent Agenda Items 7a-m be approved.
Reg CC Mtg, June 20, 2023, Page #2
Lomita City Council Meeting Agenda June 20, 2023
a. Motion to Waive Full Reading of Ordinances and that They be Read in Title Only RECOMMENDED ACTION: Approve motion.
b. Warrants/Payroll Register
RECOMMENDED ACTION: Approve and file Warrants/Payroll Register. c. Monthly Report for the Administrative Services Department RECOMMENDED ACTION: Receive and file the report.
d. Monthly Report for the City Manager’s Department
RECOMMENDED ACTION: Receive and file the report.
e. Monthly Report for the Community and Economic Development Department RECOMMENDED ACTION: Receive and file the report.
f. Monthly Report for the Recreation and Facilities Division RECOMMENDED ACTION: Receive and file the report.
g. Monthly Report for the Public Works Department
RECOMMENDED ACTION: Receive and file the report.
h. April 2023 Treasury & Investment Report
RECOMMENDED ACTION: Receive and file the report.
i. Second reading and adoption of Ordinance No. 854 for Zoning Text Amendment No. 2023-06, Amending Lomita Municipal Code Title XI (Planning and Zoning) Modifying Accessory Dwelling Unit (ADU) Regulations, and Finding the Action to be Exempt from the California Environmental Quality Act
RECOMMENDED ACTION: Adopt ordinance.
ORDINANCE NO. 854 - AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF
LOMITA, CALIFORNIA, AMENDING LOMITA MUNICIPAL CODE TITLE XI (PLANNING AND ZONING), CHAPTER 1 (ZONING), REVISING THE CITY’S REGULATIONS FOR
ACCESSORY DWELLING UNITS TO COMPLY WITH STATE LEGISLATION AND
REESTABLISH CITY STANDARDS AND A DETERMINATION THAT THE PROJECT IS
CATEGORICALLY EXEMPT FROM THE CALIFORNIA ENVIRONMENTAL QUALITY
ACT (CEQA)
j. Consideration of Purchase of Emergency Standby Generator at Appian Way Project RECOMMENDED ACTION: 1) Authorize staff to release the bid package for the Emergency Standby Generator at Appian Way project; 2) Approve the purchase of a standby generator and load bank in the amount of $219,476.40; 3) Authorize the rental of Reg CC Mtg, June 20, 2023, Page #3
Lomita City Council Meeting Agenda June 20, 2023
a generator for up to $47,537.79; 4) Reappropriate $57,970 from 520-840-5820.134 from FY 22-23 to FY 23-24; 5) Appropriate $348,414.19 to 520-840-5820.134 for FY 23-24; 6) Find this project Categorically exempt from CEQA; and 7) Authorize the City Manager to execute the Purchase Orders for Standby Generator, Rental Generator and Load Bank k. Consideration of a Lease Agreement with the Roman Catholic Archdiocese of Los Angeles for 150 Acre-Feet of Unused FY 2022-2023 Groundwater Pumping Rights
RECOMMENDED ACTION: Approve a lease agreement with the Roman Catholic Archdiocese of Los Angeles for 150 acre-feet of unused FY 2022-2023 groundwater pumping rights at a price of $100.00 per acre-foot for a total of $15,000; and authorize the City Manager to execute the agreement.
l. Consideration of an Amendment to the Professional Services Agreement with Westfield Electric, Inc. to Provide As-Needed Electrical Services RECOMMENDED ACTION: Authorize the City Manager to execute an amendment to the agreement with Westfield Electric, Inc. to provide professional as-needed electrical services.
m. Consideration of Budget Amendment for the Los Angeles County Sheriff’s Department Annual Contract
RECOMMENDED ACTION: Authorize the City Manager to execute the Fiscal Year 2023-2024 Form 575 for the Los Angeles County Sheriff’s Department and amend the Fiscal Year 2023-2024 Budget for an additional $165,000 for a total of $4,504,560.
8. SCHEDULED ITEMS
a. UPDATE AND DISCUSSION OF THE CYPRESS WATER PRODUCTION FACILITY Presented by Carla Dillon, Public Works Director
RECOMMENDED ACTION: Information only.
9. PUBLIC HEARINGS
None scheduled.
10. ADJOURNMENT
Written materials distributed to the City Council within 72 hours of the City Council meeting are available for public inspection via the City’s website and copies are available for public inspection beginning the next regular business day in the City Clerk’s Office, 24300 Narbonne Avenue, Lomita.
In compliance with the Americans with Disabilities Act (ADA) if you need special assistance to participate in this meeting, please contact the office of the City Clerk at (310) 325-7110. Notification at least forty-eight (48) hours prior to the meeting will enable the City to make reasonable arrangements.
Reg CC Mtg, June 20, 2023, Page #4
Lomita City Council Meeting Agenda June 20, 2023
I hereby certify under penalty of perjury under the laws of the State of California that the foregoing agenda was posted not less than 72 hours prior to the meeting at the following locations: Lomita City Hall, Lomita Park, and uploaded to the City of Lomita website http://www.lomita.com/cityhall/city_agendas/.
Date Posted: June 16, 2023
________________________________
Linda E. Abbott, CMC, Deputy City Clerk
Reg CC Mtg, June 20, 2023, Page #5
CONSENT CALENDAR
AGENDA NO. 7b
June 20, 2023
TO: Honorable Mayor and City Council
FROM: Administrative Services Department
DATE: June 20, 2023
SUBJECT: WARRANT REGISTER
PAYROLL REGISTER
June 20, 2023 TOTAL WARRANTS ISSUED: $723,133.93
Wires Transfers: 10885-10894
Prepay: 530774-530778
Check Numbers: 530779-530865
Total Pages of Register: 16
June 2, 2023 TOTAL PAYROLL ISSUED: $120,330.59
I hereby certify that the demands or claims covered by the checks listed on pages 1 to 16 inclusive of the check register are accurate and funds are available for payment thereof:
__________________________
Susan Kamada
Administrative Services Director
Reg CC Mtg, June 20, 2023, Page #6
6/14/2023 12:08:34 PM Page 1 of 16
Warrant Register
Lomita, CA By Vendor Name
Payment Dates 6/7/2023 - 6/20/2023
Payment Number Payment Date Vendor Name Payable Number Description (Item) Amount Vendor: 7228 - #1 All Safe & Secure
530779 06/20/2023 #1 All Safe & Secure 05-2023 Pre-Employee Live Scan 60.00 Vendor 7228 - #1 All Safe & Secure Total: 60.00
Vendor: 7353 - ACE Whatever It Takes
530780 06/20/2023 ACE Whatever It Takes 5898 Rotary Access Kit 180 Pieces 44.09 530780 06/20/2023 ACE Whatever It Takes 5903 Graffiti All Purpose Remover … 13.21 530780 06/20/2023 ACE Whatever It Takes 5903 High Performance Impact Glo… 25.35 530780 06/20/2023 ACE Whatever It Takes 5903 Steel Rake Wood Handle 22.04 530780 06/20/2023 ACE Whatever It Takes 5904 5/16" X 3" Zinc-Plated Steel C… 48.50 530780 06/20/2023 ACE Whatever It Takes 5904 5/16" Zinc-Plated Steel USS H… 5.83 530780 06/20/2023 ACE Whatever It Takes 5910 LED Bulb Daylight 100 Watt 6-… 35.27 530780 06/20/2023 ACE Whatever It Takes 5915 Gloves Leather 57.31 530780 06/20/2023 ACE Whatever It Takes 5915 Impact Glove 25.34 530780 06/20/2023 ACE Whatever It Takes 5916 5/8" D X 4" L Zinc-Plated Iron … 22.01 530780 06/20/2023 ACE Whatever It Takes 5916 Cable Tie 14" 100-Pk 33.05 530780 06/20/2023 ACE Whatever It Takes 5916 Cable Tie 36" 9.91 530780 06/20/2023 ACE Whatever It Takes 5916 Cable Tie 11" 100-Pk 15.42 Vendor 7353 - ACE Whatever It Takes Total: 357.33
Vendor: 4015 - AFLAC
530781 06/20/2023 AFLAC 882908 Employee Life/Accident Benefi… 145.02 530781 06/20/2023 AFLAC 882908 Employee Life/Accident Benefi… 43.50 530781 06/20/2023 AFLAC 882908 Employee Life/Accident Benefi… 22.36 530781 06/20/2023 AFLAC 882908 Employee Life/Accident Benefi… 51.01 Vendor 4015 - AFLAC Total: 261.89
Vendor: 12207 - AKM Consulting Engineers, Inc.
530782 06/20/2023 AKM Consulting Engineers, Inc. 0012247 Consulting Sevices for CWPF … 3,950.00 Vendor 12207 - AKM Consulting Engineers, Inc. Total: 3,950.00 Vendor: 7445 - All City Management Services, Inc.
530783 06/20/2023 All City Management Services, …86012 Crossing Guard Services 5,338.80 Vendor 7445 - All City Management Services, Inc. Total: 5,338.80 Vendor: 0545 - Allied Waste Transfer Services (BFI Falcon TS) 530784 06/20/2023 Allied Waste Transfer Services …4404-000021815 Dump Fee 702.96 Vendor 0545 - Allied Waste Transfer Services (BFI Falcon TS) Total: 702.96 Vendor: 12155 - Amazon Capital Services
530785 06/20/2023 Amazon Capital Services 13YY-VTJ1-1RJY Cat6 Outdoor Ethernet Cable … 19.42 530785 06/20/2023 Amazon Capital Services 17Jf-KJDK-67Q6 COVID-19 Rapid Test 193.20 530785 06/20/2023 Amazon Capital Services 19LV-43FF-D1LX Toner Cartridge 328.52 530785 06/20/2023 Amazon Capital Services 1CP9-KCK3-G4NP Cat6 Outdoor Ethernet Cable … 34.92 530785 06/20/2023 Amazon Capital Services 1CP9-KCK3-G4NP 10 ft Floor Cable Cover Protec… 93.93 530785 06/20/2023 Amazon Capital Services 1DJ3-JRKG-DGLM Battery Compatible with Dell I… 26.33 530785 06/20/2023 Amazon Capital Services 1JYG-1TFC-3JLV Steamer for Clothes 43.64 530785 06/20/2023 Amazon Capital Services 1KRV-QLT1-RT9R Foam Antibacterial Hand-Wash 365.40 530785 06/20/2023 Amazon Capital Services 1MCK-KWN9-CRD7 Waste Toner Container 60.63 530785 06/20/2023 Amazon Capital Services 1MCK-KWN9-CRD7 6 X 10 ft American Flag 178.57 530785 06/20/2023 Amazon Capital Services 1MCK-KWN9-CRD7 4 X 6 ft California Flag 80.75 530785 06/20/2023 Amazon Capital Services 1MCK-KWN9-CRD7 4 X 6 ft American Flag 55.10 530785 06/20/2023 Amazon Capital Services 1WG6-4MDV-77FX LED Flame Light Bulbs 16.53 530785 06/20/2023 Amazon Capital Services 1XVL-FJXF-1RKQ 36" Stand Up Desk Converter … 109.15 530785 06/20/2023 Amazon Capital Services 1XVL-FJXF-1RKQ 36" Stand Up Desk Converter … 109.13 530785 06/20/2023 Amazon Capital Services 1XWL-97GT-4C36 Gridwall Panel Display Stand 2'… 79.37 530785 06/20/2023 Amazon Capital Services 1XWL-97GT-4C36 Gridwall Panel Display Stand 2'… 79.37 Vendor 12155 - Amazon Capital Services Total: 1,873.96
Reg CC Mtg, June 20, 2023, Page #7
Warrant Register Payment Dates: 6/7/2023 - 6/20/2023
6/14/2023 12:08:34 PM Page 2 of 16
Payment Number Payment Date Vendor Name Payable Number Description (Item) Amount Vendor: 12836 - American Dark Fiber, LLC
530786 06/20/2023 American Dark Fiber, LLC ADF-1907SL-U1-LOMITA Splice New Fiber and Relocate… 4,500.00 530786 06/20/2023 American Dark Fiber, LLC ADF-1907SL-U1-LOMITA Pothole, Locate Conduit, Find… 4,000.00 530786 06/20/2023 American Dark Fiber, LLC ADF-1907SL-U1-LOMITA Place New Fiber and New Acc… 4,000.00 Vendor 12836 - American Dark Fiber, LLC Total: 12,500.00 Vendor: 4010 - Ameritas Life Insurance
530787 06/20/2023 Ameritas Life Insurance June 23 Employee Dental Insurance-Ju… 50.88 530787 06/20/2023 Ameritas Life Insurance June 23 Employee Dental Insurance-Ju… 2,922.53 530787 06/20/2023 Ameritas Life Insurance June 23 Employee Dental Insurance-Ju… 94.13 530787 06/20/2023 Ameritas Life Insurance June 23 Employee Dental Insurance-Ju… 73.78 530787 06/20/2023 Ameritas Life Insurance June 23 Employee Dental Insurance-Ju… 38.16 530787 06/20/2023 Ameritas Life Insurance June 23 Employee Dental Insurance-Ju… 53.33 530787 06/20/2023 Ameritas Life Insurance June 23 Employee Dental Insurance-Ju… 152.64 530787 06/20/2023 Ameritas Life Insurance June 23 Employee Dental Insurance-Ju… 72.46 530787 06/20/2023 Ameritas Life Insurance June 23 Employee Dental Insurance-Ju… 61.06 530787 06/20/2023 Ameritas Life Insurance June 23 Employee Dental Insurance-Ju… 101.76 530787 06/20/2023 Ameritas Life Insurance June 23 Employee Dental Insurance-Ju… 50.88 530787 06/20/2023 Ameritas Life Insurance June 23 Employee Dental Insurance-Ju… 180.62 530787 06/20/2023 Ameritas Life Insurance June 23 Employee Dental Insurance-Ju… 101.76 530787 06/20/2023 Ameritas Life Insurance June 23 Employee Dental Insurance-Ju… 11.70 530787 06/20/2023 Ameritas Life Insurance June 23 Employee Dental Insurance-Ju… 7.63 530787 06/20/2023 Ameritas Life Insurance June 23 Employee Dental Insurance-Ju… 16.28 530787 06/20/2023 Ameritas Life Insurance June 23 Employee Dental Insurance-Ju… 63.60 530787 06/20/2023 Ameritas Life Insurance June 23 Employee Dental Insurance-Ju… 53.33 530787 06/20/2023 Ameritas Life Insurance June 23 Employee Dental Insurance-Ju… 554.91 Vendor 4010 - Ameritas Life Insurance Total: 4,661.44
Vendor: 12857 - Andres Juarez
530788 06/20/2023 Andres Juarez 2004072.001 Refund -Museum Deposit 100.00 Vendor 12857 - Andres Juarez Total: 100.00
Vendor: 12257 - Aramsco Inc.
530789 06/20/2023 Aramsco Inc. S5847754.002 Toilet Tissue 9" 2-Ply 12 Roll p… 524.79 530789 06/20/2023 Aramsco Inc. S5847754.002 Liner Black 33 X 39 1.3 Mil 250… 113.89 530789 06/20/2023 Aramsco Inc. S5847754.002 Toilet Tissue 96-Cae 91.72 530789 06/20/2023 Aramsco Inc. S5847754.002 Black Liners B60XH 36 X 58 72.50 530789 06/20/2023 Aramsco Inc. S5847754.002 Seat Covers 1/2 Fold 250-Pk 2… 51.02 530789 06/20/2023 Aramsco Inc. S5847754.002 Multi Fold Towels 250 per Pac… 915.45 530789 06/20/2023 Aramsco Inc. S5847754.002 Neutra Klean "No Rinse' Galon 44.14 Vendor 12257 - Aramsco Inc. Total: 1,813.51
Vendor: 6609 - AT&T
530790 06/20/2023 AT&T 20052525 City Hall and Park May 23 471.19 530790 06/20/2023 AT&T 20052525 Water May 23 47.08
530790 06/20/2023 AT&T 20052527 Railroad Museum May 23 24.29 530790 06/20/2023 AT&T 20052929 City Hall May 23 18.34
Vendor 6609 - AT&T Total: 560.90
Vendor: 6705 - Atlas Marketing Products
530791 06/20/2023 Atlas Marketing Products 4032 Catalina Day Tote Bags, Royal … 575.91 530791 06/20/2023 Atlas Marketing Products 4032 Set-up Charges 60.64 Vendor 6705 - Atlas Marketing Products Total: 636.55
Vendor: 4020 - Automatic Data Processing
10891 06/09/2023 Automatic Data Processing 634852373 Workforce HCM 510.00 10891 06/09/2023 Automatic Data Processing 634852373 Workforce HCM 170.00 10892 06/09/2023 Automatic Data Processing 634851374 Payroll Processing-Pay Ending … 1,858.30 10892 06/09/2023 Automatic Data Processing 634851374 Payroll Processing-Pay Ending … 619.43 10893 06/09/2023 Automatic Data Processing 634851665 Workforce Time and Attendan… 687.39 10893 06/09/2023 Automatic Data Processing 634851665 Workforce Time and Attendan… 229.13 Vendor 4020 - Automatic Data Processing Total: 4,074.25 Vendor: 3334 - Autozone, Inc.
530792 06/20/2023 Autozone, Inc. 2859664701 Heavy Duty 3" Pin & Ergo Clip 14.18 Reg CC Mtg, June 20, 2023, Page #8
Warrant Register Payment Dates: 6/7/2023 - 6/20/2023
6/14/2023 12:08:34 PM Page 3 of 16
Payment Number Payment Date Vendor Name Payable Number Description (Item) Amount 530792 06/20/2023 Autozone, Inc. 2859664701 10W-30 Motor Oil 6.47 Vendor 3334 - Autozone, Inc. Total: 20.65
Vendor: 0415 - B.D. White Top Soil Co.
530793 06/20/2023 B.D. White Top Soil Co. 88868 Dirt 57.88 Vendor 0415 - B.D. White Top Soil Co. Total: 57.88
Vendor: 12201 - Barley Project, LLC
530794 06/20/2023 Barley Project, LLC 2084 Band Performance for Founde… 1,000.00 Vendor 12201 - Barley Project, LLC Total: 1,000.00
Vendor: 12762 - Brianna Rindge
530795 06/20/2023 Brianna Rindge 060723 Wellness Reimbursement 150.00 Vendor 12762 - Brianna Rindge Total: 150.00
Vendor: 3168 - California Banner & Sign Co.
530796 06/20/2023 California Banner & Sign Co. 20080 Digital Output Banner, 1ft, 10… 272.66 530796 06/20/2023 California Banner & Sign Co. 20112 24" X 36" Digitally Printed Cor… 657.00 530796 06/20/2023 California Banner & Sign Co. 20113 Street Banners 4' X 30' Sponso… 131.40 530796 06/20/2023 California Banner & Sign Co. 20113 Digital Output Sponsor Decals 80.00 Vendor 3168 - California Banner & Sign Co. Total: 1,141.06 Vendor: 7319 - California State Disbursement Unit
530797 06/20/2023 California State Disbursement… 063023 Employee Garnishment-Pay D… 230.76 Vendor 7319 - California State Disbursement Unit Total: 230.76 Vendor: 0655 - California Water Service
530798 06/20/2023 California Water Service 6984422222-052523 PV Dr. No. Rolling Vista Media… 244.81 530798 06/20/2023 California Water Service 8594422222-052523 Landscape Maintenance Distri… 159.16 Vendor 0655 - California Water Service Total: 403.97
Vendor: 12854 - Carson Chevrolet
530774 06/08/2023 Carson Chevrolet 31516 2023 Chevy Colorado Truck 33,004.22 530774 06/08/2023 Carson Chevrolet 31516 2023 Chevy Colorado Truck-To… 451.75 530774 06/08/2023 Carson Chevrolet 31516 2023 Chevy Colorado Truck-D… 126.72 Vendor 12854 - Carson Chevrolet Total: 33,582.69
Vendor: 12858 - Carson Nissan
530777 06/13/2023 Carson Nissan C3560706 2023 Nissan Leaf for Parking E… 31,418.94 530777 06/13/2023 Carson Nissan C3560706 2023 Nissan Leaf for Parking E… 558.00 530777 06/13/2023 Carson Nissan C3561249 2023 Nissan Leaf for Water D… 31,418.94 530777 06/13/2023 Carson Nissan C3561249 2023 Nissan Leaf for Water D… 558.00 Vendor 12858 - Carson Nissan Total: 63,953.88
Vendor: 4040 - Colonial Insurance Co.
10890 06/20/2023 Colonial Insurance Co. June 23 Employee Life/Accident Insur… 474.33 10890 06/20/2023 Colonial Insurance Co. June 23 Employee Life/Accident Insur… 453.82 10890 06/20/2023 Colonial Insurance Co. June 23 Employee Life/Accident Insur… 220.87 10890 06/20/2023 Colonial Insurance Co. June 23 Employee Life/Accident Insur… 80.09 10890 06/20/2023 Colonial Insurance Co. June 23 Employee Life/Accident Insur… 73.62 10890 06/20/2023 Colonial Insurance Co. June 23 Employee Life/Accident Insur… 97.04 Vendor 4040 - Colonial Insurance Co. Total: 1,399.77
Vendor: 0915 - Copy Rite Printing
530799 06/20/2023 Copy Rite Printing 39577 Window Envelopes W/Blue Ink… 132.44 530799 06/20/2023 Copy Rite Printing 39578 Business Cards-Planning Com… 41.56 530799 06/20/2023 Copy Rite Printing 39580 Door Hangers 141.50 530799 06/20/2023 Copy Rite Printing 39581 Business Cards-S. Bass 24.78 530799 06/20/2023 Copy Rite Printing 39581 Business Cards-S. Bass 24.44 530799 06/20/2023 Copy Rite Printing 39584 Business Cards-L. MacMorran 49.22 Vendor 0915 - Copy Rite Printing Total: 413.94
Vendor: 7371 - Corporate Payment Systems
530800 06/20/2023 Corporate Payment Systems B. Rindge 052523 Hotel Charge 1,111.40 530800 06/20/2023 Corporate Payment Systems B. Rindge 052523 Contract Cities Conference-Fo… 35.67 530800 06/20/2023 Corporate Payment Systems B. Rindge 052523 Parking 17.00 530800 06/20/2023 Corporate Payment Systems B. Rindge 052523 Contract Cities Conference-Fo… 19.13 530800 06/20/2023 Corporate Payment Systems B. Rindge 052523 Lomita Chamber-Business Mix… 12.51 Reg CC Mtg, June 20, 2023, Page #9
Warrant Register Payment Dates: 6/7/2023 - 6/20/2023
6/14/2023 12:08:34 PM Page 4 of 16
Payment Number Payment Date Vendor Name Payable Number Description (Item) Amount 530800 06/20/2023 Corporate Payment Systems B. Rindge 052523 Contract Cities Conference-Fo… 16.70 530800 06/20/2023 Corporate Payment Systems C. Dillon 052523 Cisco Meet Plan 7.50 530800 06/20/2023 Corporate Payment Systems C. Dillon 052523 Cisco Meet Plan 7.50 530800 06/20/2023 Corporate Payment Systems C. Dillon 052523 Calif. Water Efficiency Partner… 463.50 530800 06/20/2023 Corporate Payment Systems C. Villa 052523 Canva Subscription 12.99 530800 06/20/2023 Corporate Payment Systems C. Villa 052523 Calameo, Membership Dues 588.00 530800 06/20/2023 Corporate Payment Systems C. Villa 052523 Founder's Day Wristbands 291.40 530800 06/20/2023 Corporate Payment Systems D. Dixon 052523 Supervisor Harassment Preven… 18.70 530800 06/20/2023 Corporate Payment Systems D. Dixon 052523 Supervisor Harassment Preven… 18.49 530800 06/20/2023 Corporate Payment Systems D. Dixon 052523 Birthday Celebration 57.60 530800 06/20/2023 Corporate Payment Systems D. Dixon 052523 Supervisor Harassment Preven… 4.79 530800 06/20/2023 Corporate Payment Systems G. Sugano 052523 Zoom Video 15.99 530800 06/20/2023 Corporate Payment Systems G. Sugano 052523 Acrobat Pro 513.71 530800 06/20/2023 Corporate Payment Systems H. Flores 052523 Staff Lunch 238.90 530800 06/20/2023 Corporate Payment Systems H. Flores 052523 Mower Supplies 460.37 530800 06/20/2023 Corporate Payment Systems J. Gazeley 052523 Hotel Charge 341.98 530800 06/20/2023 Corporate Payment Systems K. Gregory 052523 City Council Meeting Dinner 50.10 530800 06/20/2023 Corporate Payment Systems K. Gregory 052523 City Council Meeting Dinner 89.26 530800 06/20/2023 Corporate Payment Systems K. Gregory 052523 Daily Breeze Subscription 10.00 530800 06/20/2023 Corporate Payment Systems K. Gregory 052523 NNA Membership-L. Abbott 129.00 530800 06/20/2023 Corporate Payment Systems K. Gregory 052523 Dropbox 19.99 530800 06/20/2023 Corporate Payment Systems K. Gregory 052523 eSignature Standard Edition 600.00 530800 06/20/2023 Corporate Payment Systems L. Hernandez 052523 Hotel Charge 1,735.48 530800 06/20/2023 Corporate Payment Systems Lomita Park 052523 Daily Breeze Subscription 26.00 530800 06/20/2023 Corporate Payment Systems Lomita Park 052523 Museum Event Promotion 44.38 530800 06/20/2023 Corporate Payment Systems Lomita Park 052523 Staff Lunch 67.09 530800 06/20/2023 Corporate Payment Systems M. Andersen 052523 Math Book for Water Treatm… 86.42 530800 06/20/2023 Corporate Payment Systems M. Andersen 052523 Tubing for Air and Water, 1/8" 185.25 530800 06/20/2023 Corporate Payment Systems M. Andersen 052523 Staff Lunch 97.02 530800 06/20/2023 Corporate Payment Systems M. Sansbury 052523 Electrode Onsite/Home Adult … 372.10 530800 06/20/2023 Corporate Payment Systems M. Sansbury 052523 Maintenance Supplies 51.46 530800 06/20/2023 Corporate Payment Systems M. Sansbury 052523 Peanut Butter for Mouse Trap 3.49 530800 06/20/2023 Corporate Payment Systems M. Sansbury 052523 Mass Mobile Apps 99.00 530800 06/20/2023 Corporate Payment Systems R. Smoot 052523 League of California Cities Reg… 50.00 530800 06/20/2023 Corporate Payment Systems R. Smoot 052523 League of California Cities Reg… 50.00 530800 06/20/2023 Corporate Payment Systems R. Smoot 052523 Hotel Charge-R. Smoot 1,294.04 530800 06/20/2023 Corporate Payment Systems W. Lawson 052523 Property Report 114.03 530800 06/20/2023 Corporate Payment Systems W. Lawson 052523 Gas 59.46 530800 06/20/2023 Corporate Payment Systems W. Lawson 052523 Code Enforcement Subscripti… 25.95 Vendor 7371 - Corporate Payment Systems Total: 9,513.35 Vendor: 12721 - Cory Zedler
530801 06/20/2023 Cory Zedler 053123 Mileage Reimbursement 55.28 Vendor 12721 - Cory Zedler Total: 55.28
Vendor: 6828 - Creative Software Solutions
530802 06/20/2023 Creative Software Solutions CINV-034621 DAR May 23 498.33 Vendor 6828 - Creative Software Solutions Total: 498.33 Vendor: 6757 - Dataprose, Inc.
530803 06/20/2023 Dataprose, Inc. DP2302115 Water Bills 2,708.62 Vendor 6757 - Dataprose, Inc. Total: 2,708.62
Vendor: 12704 - David Evans & Associates, Inc.
530804 06/20/2023 David Evans & Associates, Inc. 533955 Engineering Design Services-N… 818.73 530804 06/20/2023 David Evans & Associates, Inc. 533955 Engineering Design Services-N… 818.73 530804 06/20/2023 David Evans & Associates, Inc. 533955 Engineering Design Services-N… 3,943.54 530804 06/20/2023 David Evans & Associates, Inc. 536135 Engineering Design Services-N… 2,885.66 530804 06/20/2023 David Evans & Associates, Inc. 536135 Engineering Design Services-N… 2,885.66 530804 06/20/2023 David Evans & Associates, Inc. 536135 Engineering Design Services-N… 13,899.28 Vendor 12704 - David Evans & Associates, Inc. Total: 25,251.60 Reg CC Mtg, June 20, 2023, Page #10
Warrant Register Payment Dates: 6/7/2023 - 6/20/2023
6/14/2023 12:08:34 PM Page 5 of 16
Payment Number Payment Date Vendor Name Payable Number Description (Item) Amount Vendor: 1075 - Department of Justice
530805 06/20/2023 Department of Justice 660595 Live Scan May 23 128.00 Vendor 1075 - Department of Justice Total: 128.00
Vendor: 2010 - Discount Pool & Spa Supply
530806 06/20/2023 Discount Pool & Spa Supply 344398-1 Liquid Chloride 187.43 530806 06/20/2023 Discount Pool & Spa Supply 344398-1 Deposit-Case 40.00 530806 06/20/2023 Discount Pool & Spa Supply 345053-1 Returning Deposit for Cases -50.00 530806 06/20/2023 Discount Pool & Spa Supply 345634-1 Clear View 1" Tabs 5 LB Pail 121.25 Vendor 2010 - Discount Pool & Spa Supply Total: 298.68
Vendor: 7290 - Eden Serina
530807 06/20/2023 Eden Serina 060523 Yoga Class Instructor 2,345.00 Vendor 7290 - Eden Serina Total: 2,345.00
Vendor: 12580 - Elite Special Events, Inc.
530775 06/12/2023 Elite Special Events, Inc. 144-01 Founder's Day-Train Ride Serv… 1,850.00 Vendor 12580 - Elite Special Events, Inc. Total: 1,850.00 Vendor: 12001 - Evangelina Hernandez
530808 06/20/2023 Evangelina Hernandez 060123 Mileage Reimbursement 17.82 Vendor 12001 - Evangelina Hernandez Total: 17.82
Vendor: 12851 - Get Around Sound
530809 06/20/2023 Get Around Sound 042423 2 Days Sound System Rental-… 150.00 530809 06/20/2023 Get Around Sound 042423 2 Days Sound System Rental 1,500.00 530809 06/20/2023 Get Around Sound 042423 2 Days Sound System Rental-L… 3,420.00 Vendor 12851 - Get Around Sound Total: 5,070.00
Vendor: 6718 - Graffiti Protective Coatings Inc.
530810 06/20/2023 Graffiti Protective Coatings Inc. 7031-0523 Graffiti Removal May 23 2,400.00 Vendor 6718 - Graffiti Protective Coatings Inc. Total: 2,400.00 Vendor: 3070 - Grainger
530811 06/20/2023 Grainger 9727340011 Full Body Harness 119.97 530811 06/20/2023 Grainger 9727340011 Half Mask Respirator Kit 82.20 530811 06/20/2023 Grainger 9727340011 Respirator Wipes 36.10 Vendor 3070 - Grainger Total: 238.27
Vendor: 3036 - Harbor Freight Tools USA, Inc.
530812 06/20/2023 Harbor Freight Tools USA, Inc. 1015182 Cable Ties 350 Pc Colored 6.59 530812 06/20/2023 Harbor Freight Tools USA, Inc. 1015182 Paint Brush 2" Angle 1.64 530812 06/20/2023 Harbor Freight Tools USA, Inc. 1015182 14 in 1 Paint Tool 5.50 530812 06/20/2023 Harbor Freight Tools USA, Inc. 1015182 Steel Socket Rail Set 8.17 530812 06/20/2023 Harbor Freight Tools USA, Inc. 1015182 Nitrile Gloves 50 Pc 16.53 530812 06/20/2023 Harbor Freight Tools USA, Inc. 1015475 1/4" Compact Regulator 24.24 530812 06/20/2023 Harbor Freight Tools USA, Inc. 1015475 Mini Filter 1/4" 22.04 530812 06/20/2023 Harbor Freight Tools USA, Inc. 1015475 1/4" Female Pipe T-Connector 4.40 530812 06/20/2023 Harbor Freight Tools USA, Inc. 1015475 3/8" X 100' Diamond Braid Ro… 8.81 530812 06/20/2023 Harbor Freight Tools USA, Inc. 1015475 6" Crimped Wire Wheel 7.16 530812 06/20/2023 Harbor Freight Tools USA, Inc. 1015475 6" Bench Grinder with Light 60.63 530812 06/20/2023 Harbor Freight Tools USA, Inc. 1015475 1/4 Full Port Ball Valve 5.17 530812 06/20/2023 Harbor Freight Tools USA, Inc. 1015475 1/4" Female Brass Uni Coupler 4.95 Vendor 3036 - Harbor Freight Tools USA, Inc. Total: 175.83 Vendor: 7144 - Hazen and Sawyer, P.C.
530813 06/20/2023 Hazen and Sawyer, P.C. 20007-010-0000029 Consulting Services-CWPF 20,715.50 Vendor 7144 - Hazen and Sawyer, P.C. Total: 20,715.50
Vendor: 3052 - Home Depot Credit Services
530814 06/20/2023 Home Depot Credit Services 0112697 Fluorescent CFL Light Bulb, Da… 14.31 530814 06/20/2023 Home Depot Credit Services 0112697 High Performance Toilet Fill Va… 16.52 530814 06/20/2023 Home Depot Credit Services 0112697 Antibacterial Hand Soap 128 oz 21.83 530814 06/20/2023 Home Depot Credit Services 0112697 LED Light Bulb in Daylight 2-Pk 10.99 530814 06/20/2023 Home Depot Credit Services 0112697 LED Light Bulb Daylight 2-Pk 14.31 530814 06/20/2023 Home Depot Credit Services 0353711 Bucket 5 Gal 4.94 530814 06/20/2023 Home Depot Credit Services 0353711 Disinfecting Wipes Flat Pack 8… 13.85 Reg CC Mtg, June 20, 2023, Page #11
Warrant Register Payment Dates: 6/7/2023 - 6/20/2023
6/14/2023 12:08:34 PM Page 6 of 16
Payment Number Payment Date Vendor Name Payable Number Description (Item) Amount 530814 06/20/2023 Home Depot Credit Services 0353711 Tan Duck Canvas Glove 18.01 530814 06/20/2023 Home Depot Credit Services 0353711 Replacement Respirator Cartr… 82.04 530814 06/20/2023 Home Depot Credit Services 0353711 Disposable Paint Project Respi… 103.55 530814 06/20/2023 Home Depot Credit Services 0353711 Knit Work Gloves 13.21 530814 06/20/2023 Home Depot Credit Services 1234806 Returning Asphalt Sealer -34.00 530814 06/20/2023 Home Depot Credit Services 2090919 Cleaning Vinegar 64 oz 6.35 530814 06/20/2023 Home Depot Credit Services 2090919 Ultra-Thin LED White Puck Lig… 19.80 530814 06/20/2023 Home Depot Credit Services 2090919 Lysol All Purpose 144 oz 27.30 530814 06/20/2023 Home Depot Credit Services 2090919 Bathroom Faucet in Polished … 38.57 530814 06/20/2023 Home Depot Credit Services 2090919 LED Tube Light Bulb, Tunable… 99.23 530814 06/20/2023 Home Depot Credit Services 2090936 Slip-Joint Outlet 1/4-Turn Ang… 23.59 530814 06/20/2023 Home Depot Credit Services 2090936 Braided Polymer Faucet Suppl… 13.08 530814 06/20/2023 Home Depot Credit Services 2090936 1/2" x 260" Thread Sealing 1.08 530814 06/20/2023 Home Depot Credit Services 2090936 AAA Batteries 10-Pk 9.78 530814 06/20/2023 Home Depot Credit Services 2201864 Returning Joint Outlet 1/4-Tur… -23.54 530814 06/20/2023 Home Depot Credit Services 2201865 Slip-Joint Outlet 1/4-Turn Ang… 24.16 530814 06/20/2023 Home Depot Credit Services 31031 Water Bottle Deposit 6.00 530814 06/20/2023 Home Depot Credit Services 31031 Bottle Water 24.90 530814 06/20/2023 Home Depot Credit Services 31031 Airwick Auto Fresh 2-Pk 13.21 530814 06/20/2023 Home Depot Credit Services 31031 1.33 gal. Weed and Grass Killer 33.04 530814 06/20/2023 Home Depot Credit Services 31031 Energizer Max AA 36-Pk 39.40 530814 06/20/2023 Home Depot Credit Services 31031 Toilet Paper 30 Mega Roll 41.46 530814 06/20/2023 Home Depot Credit Services 31031 Lysol Disinfect 190 oz 59.40 530814 06/20/2023 Home Depot Credit Services 3116028 Energizer Max AA 36-Pk 39.40 530814 06/20/2023 Home Depot Credit Services 3116028 Nitrile Glove 120-Pk 23.13 530814 06/20/2023 Home Depot Credit Services 3116028 Bucket 19.52 530814 06/20/2023 Home Depot Credit Services 3116028 5 oz. Ultra Clear All Purpose … 9.90 530814 06/20/2023 Home Depot Credit Services 3116028 3/16" x 100' All-Purpose Cloth… 10.83 530814 06/20/2023 Home Depot Credit Services 4010775 Lumber Fee 0.20 530814 06/20/2023 Home Depot Credit Services 4010775 0.75" X 3.5" X 10' Wood 26.40 530814 06/20/2023 Home Depot Credit Services 5097704 Anvil Flex Putty Knife 1.5" 8.80 530814 06/20/2023 Home Depot Credit Services 5097704 Clorox Disinfecting Bleach 29.70 530814 06/20/2023 Home Depot Credit Services 5097704 Stoner Invisible Glass Aero 19 … 10.10 530814 06/20/2023 Home Depot Credit Services 5097704 Speed-Feed 400 Universal Tri… 36.06 530814 06/20/2023 Home Depot Credit Services 5097704 Toilet Paper 30 Mega Roll 41.87 530814 06/20/2023 Home Depot Credit Services 5113142 11 in. UV Cable Tie, Black (500… 48.76 530814 06/20/2023 Home Depot Credit Services 5113142 Assorted Cable Ties 650-Pack 24.26 530814 06/20/2023 Home Depot Credit Services 6591891 50 lbs Asphalt Sealer 170.01 Vendor 3052 - Home Depot Credit Services Total: 1,235.31 Vendor: 4684 - Janpier Adamzadeh
530815 06/20/2023 Janpier Adamzadeh 052323 Reimbursement for Presentat… 14.32 Vendor 4684 - Janpier Adamzadeh Total: 14.32
Vendor: 3887 - John L. Hunter & Associates
530816 06/20/2023 John L. Hunter & Associates LOM1MS412302 Consulting Services February … 1,616.67 530816 06/20/2023 John L. Hunter & Associates LOM1MS412302 Consulting Services February … 135.00 530816 06/20/2023 John L. Hunter & Associates LOM1MS412303 Consulting Services March 23 527.90 530816 06/20/2023 John L. Hunter & Associates LOM1MS412303 Consulting Services March 23 877.50 530816 06/20/2023 John L. Hunter & Associates LOM1MS412304 Consulting Services April 23 2,235.16 530816 06/20/2023 John L. Hunter & Associates LOM1MS412304 Consulting Services April 23 67.50 Vendor 3887 - John L. Hunter & Associates Total: 5,459.73 Vendor: 3048 - L.A. County Sheriff's Department
530818 06/20/2023 L.A. County Sheriff's Departm… 233235DL Traffic Enforcement May 23 1,528.07 Vendor 3048 - L.A. County Sheriff's Department Total: 1,528.07 Vendor: 7529 - L.A. County Sheriff's Department
530776 06/12/2023 L.A. County Sheriff's Departm… 061623 Employee Garnishment-Pay D… 334.75 530817 06/20/2023 L.A. County Sheriff's Departm… 063023 Employee Garnishment-Pay D… 334.75 Vendor 7529 - L.A. County Sheriff's Department Total: 669.50 Reg CC Mtg, June 20, 2023, Page #12
Warrant Register Payment Dates: 6/7/2023 - 6/20/2023
6/14/2023 12:08:34 PM Page 7 of 16
Payment Number Payment Date Vendor Name Payable Number Description (Item) Amount Vendor: 3652 - Leticia Moreno-Paz
530819 06/20/2023 Leticia Moreno-Paz 060123 Mileage and Parking Reimbur… 24.65 Vendor 3652 - Leticia Moreno-Paz Total: 24.65
Vendor: 3054 - Linde Gas & Equipment Inc.
530820 06/20/2023 Linde Gas & Equipment Inc. 36042565 Acetylene Torch Rental 63.87 Vendor 3054 - Linde Gas & Equipment Inc. Total: 63.87
Vendor: 3903 - Lomita City Employees Association
530821 06/20/2023 Lomita City Employees Associa…June 2023 Association Dues-June 2023 640.00 Vendor 3903 - Lomita City Employees Association Total: 640.00 Vendor: 6859 - Los Altos Trophy
530822 06/20/2023 Los Altos Trophy 92731 Generic Soccer Figure 3rd Place 237.53 530822 06/20/2023 Los Altos Trophy 92731 Silver Soccer Medal, Black Nec… 373.25 530822 06/20/2023 Los Altos Trophy 92731 Bronze Soccer Medal, Black N… 379.38 530822 06/20/2023 Los Altos Trophy 92731 Gold Soccer Medal, Black Neck… 428.32 530822 06/20/2023 Los Altos Trophy 92731 Generic Soccer Figure 2nd Pla… 487.58 530822 06/20/2023 Los Altos Trophy 92731 Generic Soccer Figure 1st Place 524.57 Vendor 6859 - Los Altos Trophy Total: 2,430.63
Vendor: 3085 - Mark's Lock & Safe, Inc.
530823 06/20/2023 Mark's Lock & Safe, Inc. 0000036455 Install Cameras-Labor 1,312.50 530823 06/20/2023 Mark's Lock & Safe, Inc. 0000036455 Install Cameras-Material 650.48 530823 06/20/2023 Mark's Lock & Safe, Inc. 0000036472 Troubleshot & Configured Ca… 1,575.00 530823 06/20/2023 Mark's Lock & Safe, Inc. 0000036472 Troubleshot & Configured Ca… 138.89 530823 06/20/2023 Mark's Lock & Safe, Inc. 0000036482 Met with Cable Co. & Pulled o… 393.75 Vendor 3085 - Mark's Lock & Safe, Inc. Total: 4,070.62
Vendor: 10932 - Michael Graf
530824 06/20/2023 Michael Graf 061223 Reimbursement for Refreshm… 58.85 Vendor 10932 - Michael Graf Total: 58.85
Vendor: 3820 - Michael Whiting
530825 06/20/2023 Michael Whiting 1a2023 Basketball Camp/Instructor Fee 5,725.00 Vendor 3820 - Michael Whiting Total: 5,725.00
Vendor: 12853 - Minsoo Kim
530826 06/20/2023 Minsoo Kim 053123 Reimbursement for Meter/Wa… 711.80 Vendor 12853 - Minsoo Kim Total: 711.80
Vendor: 7203 - Mirage Carwash
530827 06/20/2023 Mirage Carwash 2137 Car Wash 26.99
Vendor 7203 - Mirage Carwash Total: 26.99
Vendor: 3217 - MissionSquare Retirement
10885 06/07/2023 MissionSquare Retirement PD060223 Deferred Compensation Pay D… 12,761.62 10885 06/07/2023 MissionSquare Retirement PD060223 Deferred Compensation Pay D… 306.51 10885 06/07/2023 MissionSquare Retirement PD060223 Deferred Compensation Pay D… 290.93 10885 06/07/2023 MissionSquare Retirement PD060223 Deferred Compensation Pay D… 16.20 10885 06/07/2023 MissionSquare Retirement PD060223 Deferred Compensation Pay D… 144.79 10885 06/07/2023 MissionSquare Retirement PD060223 Deferred Compensation Pay D… 300.27 10885 06/07/2023 MissionSquare Retirement PD060223 Deferred Compensation Pay D… 182.34 10885 06/07/2023 MissionSquare Retirement PD060223 Deferred Compensation Pay D… 214.49 10885 06/07/2023 MissionSquare Retirement PD060223 Deferred Compensation Pay D… 207.10 10885 06/07/2023 MissionSquare Retirement PD060223 Deferred Compensation Pay D… 110.29 10885 06/07/2023 MissionSquare Retirement PD060223 Deferred Compensation Pay D… 228.61 10885 06/07/2023 MissionSquare Retirement PD060223 Deferred Compensation Pay D… 184.77 10885 06/07/2023 MissionSquare Retirement PD060223 Deferred Compensation Pay D… 48.77 10885 06/07/2023 MissionSquare Retirement PD060223 Deferred Compensation Pay D… 8.96 10885 06/07/2023 MissionSquare Retirement PD060223 Deferred Compensation Pay D… 60.31 10885 06/07/2023 MissionSquare Retirement PD060223 Deferred Compensation Pay D… 82.03 10885 06/07/2023 MissionSquare Retirement PD060223 Deferred Compensation Pay D… 144.79 10885 06/07/2023 MissionSquare Retirement PD060223 Deferred Compensation Pay D… 952.59 Vendor 3217 - MissionSquare Retirement Total: 16,245.37 Reg CC Mtg, June 20, 2023, Page #13
Warrant Register Payment Dates: 6/7/2023 - 6/20/2023
6/14/2023 12:08:34 PM Page 8 of 16
Payment Number Payment Date Vendor Name Payable Number Description (Item) Amount Vendor: 7496 - Numa Networks
530828 06/20/2023 Numa Networks 34552 IT Services June 23 3,961.17 530828 06/20/2023 Numa Networks 34552 IT Services June 23 3,961.16 Vendor 7496 - Numa Networks Total: 7,922.33
Vendor: 12004 - Occupational Health Centers of CA, A Medical Grp 530829 06/20/2023 Occupational Health Centers o…79333839 Pre-Employee Physical Exam 64.00 530829 06/20/2023 Occupational Health Centers o…79395448 Pre-Employee Physical Exam 104.00 Vendor 12004 - Occupational Health Centers of CA, A Medical Grp Total: 168.00 Vendor: 6594 - Office Depot Business Solutions, LLC
530830 06/20/2023 Office Depot Business Solutio… 313768814001 File Folders, 1/3 Cut, Letter Si… 24.77 530830 06/20/2023 Office Depot Business Solutio… 313768814001 Copy Paper 54.57 530830 06/20/2023 Office Depot Business Solutio… 313768814001 File Folders, 1/3 Cut, Letter Si… 14.43 Vendor 6594 - Office Depot Business Solutions, LLC Total: 93.77 Vendor: 4105 - Pacific Western Bank
10886 06/07/2023 Pacific Western Bank PE052623 Federal & Medicare Taxes-Pay… 16,216.98 10886 06/07/2023 Pacific Western Bank PE052623 Federal & Medicare Taxes-Pay… 2,307.86 10886 06/07/2023 Pacific Western Bank PE052623 Federal & Medicare Taxes-Pay… 9.52 10886 06/07/2023 Pacific Western Bank PE052623 Federal & Medicare Taxes-Pay… 251.64 10886 06/07/2023 Pacific Western Bank PE052623 Federal & Medicare Taxes-Pay… 95.91 10886 06/07/2023 Pacific Western Bank PE052623 Federal & Medicare Taxes-Pay… 113.88 10886 06/07/2023 Pacific Western Bank PE052623 Federal & Medicare Taxes-Pay… 27.71 10886 06/07/2023 Pacific Western Bank PE052623 Federal & Medicare Taxes-Pay… 45.02 10886 06/07/2023 Pacific Western Bank PE052623 Federal & Medicare Taxes-Pay… 20.04 10886 06/07/2023 Pacific Western Bank PE052623 Federal & Medicare Taxes-Pay… 10.73 10886 06/07/2023 Pacific Western Bank PE052623 Federal & Medicare Taxes-Pay… 216.33 10886 06/07/2023 Pacific Western Bank PE052623 Federal & Medicare Taxes-Pay… 105.90 10886 06/07/2023 Pacific Western Bank PE052623 Federal & Medicare Taxes-Pay… 5.76 10886 06/07/2023 Pacific Western Bank PE052623 Federal & Medicare Taxes-Pay… 116.43 10886 06/07/2023 Pacific Western Bank PE052623 Federal & Medicare Taxes-Pay… 15.17 10886 06/07/2023 Pacific Western Bank PE052623 Federal & Medicare Taxes-Pay… 85.44 10886 06/07/2023 Pacific Western Bank PE052623 Federal & Medicare Taxes-Pay… 109.50 10886 06/07/2023 Pacific Western Bank PE052623 Federal & Medicare Taxes-Pay… 97.10 10886 06/07/2023 Pacific Western Bank PE052623 Federal & Medicare Taxes-Pay… 139.64 10886 06/07/2023 Pacific Western Bank PE052623 Federal & Medicare Taxes-Pay… 38.33 10886 06/07/2023 Pacific Western Bank PE052623 Federal & Medicare Taxes-Pay… 67.04 10886 06/07/2023 Pacific Western Bank PE052623 Federal & Medicare Taxes-Pay… 10.09 10886 06/07/2023 Pacific Western Bank PE052623 Federal & Medicare Taxes-Pay… 22.67 10886 06/07/2023 Pacific Western Bank PE052623 Federal & Medicare Taxes-Pay… 1.11 10886 06/07/2023 Pacific Western Bank PE052623 Federal & Medicare Taxes-Pay… 60.64 10886 06/07/2023 Pacific Western Bank PE052623 Federal & Medicare Taxes-Pay… 21.69 10886 06/07/2023 Pacific Western Bank PE052623 Federal & Medicare Taxes-Pay… 120.88 10886 06/07/2023 Pacific Western Bank PE052623 Federal & Medicare Taxes-Pay… 28.20 10886 06/07/2023 Pacific Western Bank PE052623 Federal & Medicare Taxes-Pay… 471.46 10887 06/07/2023 Pacific Western Bank PE052623A State Tax Withholdings-Pay E… 6,169.79 Vendor 4105 - Pacific Western Bank Total: 27,002.46
Vendor: 4597 - Pio Nunez
530831 06/20/2023 Pio Nunez 052423 Mileage Reimbursement 43.88 Vendor 4597 - Pio Nunez Total: 43.88
Vendor: 7223 - Pitney Bowes Global Financial Services LLC. 530832 06/20/2023 Pitney Bowes Global Financial …3106101515 April-June 23 Postage Machine… 282.31 Vendor 7223 - Pitney Bowes Global Financial Services LLC. Total: 282.31 Vendor: 12512 - Prints Pacific, Inc.
530833 06/20/2023 Prints Pacific, Inc. 20568 Pullover Hooded Sweatshirt N… 109.42 530833 06/20/2023 Prints Pacific, Inc. 20568 Pullover Hooded Sweatshirt N… 1,254.09 530833 06/20/2023 Prints Pacific, Inc. 20568 Pullover Hooded Sweatshirt S… 535.18 530833 06/20/2023 Prints Pacific, Inc. 20568 Pullover Hooded Sweatshirt S… 131.31 530833 06/20/2023 Prints Pacific, Inc. 20568 Pullover Hooded Sweatshirt N… 48.40 530833 06/20/2023 Prints Pacific, Inc. 20568 Pullover Hooded Sweatshirt Bl… 24.20 Reg CC Mtg, June 20, 2023, Page #14
Warrant Register Payment Dates: 6/7/2023 - 6/20/2023
6/14/2023 12:08:34 PM Page 9 of 16
Payment Number Payment Date Vendor Name Payable Number Description (Item) Amount 530833 06/20/2023 Prints Pacific, Inc. 20568 Pullover Hooded Sweatshirt N… 121.00 Vendor 12512 - Prints Pacific, Inc. Total: 2,223.60
Vendor: 12474 - Project Partners
530834 06/20/2023 Project Partners 11192 Engineering Services 1,440.00 530834 06/20/2023 Project Partners 11192 Engineering Services 3,120.00 530834 06/20/2023 Project Partners 11192 Engineering Services 1,560.00 530834 06/20/2023 Project Partners 11192 Engineering Services 1,200.00 530834 06/20/2023 Project Partners 11192 Engineering Services 3,960.00 530834 06/20/2023 Project Partners 11192 Engineering Services 3,600.00 530834 06/20/2023 Project Partners 11246 Engineering Services 1,920.00 530834 06/20/2023 Project Partners 11246 Engineering Services 1,920.00 530834 06/20/2023 Project Partners 11246 Engineering Services 600.00 530834 06/20/2023 Project Partners 11246 Engineering Services 1,560.00 530834 06/20/2023 Project Partners 11246 Engineering Services 2,280.00 530834 06/20/2023 Project Partners 11246 Engineering Services 2,640.00 Vendor 12474 - Project Partners Total: 25,800.00
Vendor: 4090 - Public Employee Retirement System
10888 06/07/2023 Public Employee Retirement S…PE052623 Retirement Contributions-Pay… 11,798.21 10888 06/07/2023 Public Employee Retirement S…PE052623 Retirement Contributions-Pay… 25.88 10888 06/07/2023 Public Employee Retirement S…PE052623 Retirement Contributions-Pay… 700.21 10888 06/07/2023 Public Employee Retirement S…PE052623 Retirement Contributions-Pay… 807.58 10888 06/07/2023 Public Employee Retirement S…PE052623 Retirement Contributions-Pay… 308.88 10888 06/07/2023 Public Employee Retirement S…PE052623 Retirement Contributions-Pay… 150.99 10888 06/07/2023 Public Employee Retirement S…PE052623 Retirement Contributions-Pay… 202.35 10888 06/07/2023 Public Employee Retirement S…PE052623 Retirement Contributions-Pay… 257.02 10888 06/07/2023 Public Employee Retirement S…PE052623 Retirement Contributions-Pay… 230.22 10888 06/07/2023 Public Employee Retirement S…PE052623 Retirement Contributions-Pay… 487.45 10888 06/07/2023 Public Employee Retirement S…PE052623 Retirement Contributions-Pay… 132.61 10888 06/07/2023 Public Employee Retirement S…PE052623 Retirement Contributions-Pay… 136.70 10888 06/07/2023 Public Employee Retirement S…PE052623 Retirement Contributions-Pay… 1,238.86 10888 06/07/2023 Public Employee Retirement S…PE052623 Retirement Contributions-Pay… 143.71 10888 06/07/2023 Public Employee Retirement S…PE052623 Retirement Contributions-Pay… 445.89 10888 06/07/2023 Public Employee Retirement S…PE052623 Retirement Contributions-Pay… 275.19 10888 06/07/2023 Public Employee Retirement S…PE052623 Retirement Contributions-Pay… 200.83 10888 06/07/2023 Public Employee Retirement S…PE052623 Retirement Contributions-Pay… 819.18 10888 06/07/2023 Public Employee Retirement S…PE052623 Retirement Contributions-Pay… 291.09 10888 06/07/2023 Public Employee Retirement S…PE052623 Retirement Contributions-Pay… 871.14 10888 06/07/2023 Public Employee Retirement S…PE052623 Retirement Contributions-Pay… 276.71 10888 06/07/2023 Public Employee Retirement S…PE052623 Retirement Contributions-Pay… 454.33 10888 06/07/2023 Public Employee Retirement S…PE052623 Retirement Contributions-Pay… 268.50 10888 06/07/2023 Public Employee Retirement S…PE052623 Retirement Contributions-Pay… 334.72 10888 06/07/2023 Public Employee Retirement S…PE052623 Retirement Contributions-Pay… 79.47 10888 06/07/2023 Public Employee Retirement S…PE052623 Retirement Contributions-Pay… 28.11 10888 06/07/2023 Public Employee Retirement S…PE052623 Retirement Contributions-Pay… 45.77 10888 06/07/2023 Public Employee Retirement S…PE052623 Retirement Contributions-Pay… 2.88 10888 06/07/2023 Public Employee Retirement S…PE052623 Retirement Contributions-Pay… 123.57 10888 06/07/2023 Public Employee Retirement S…PE052623 Retirement Contributions-Pay… 269.19 10888 06/07/2023 Public Employee Retirement S…PE052623 Retirement Contributions-Pay… 34.44 10888 06/07/2023 Public Employee Retirement S…PE052623 Retirement Contributions-Pay… 50.59 10888 06/07/2023 Public Employee Retirement S…PE052623 Retirement Contributions-Pay… 49.29 10888 06/07/2023 Public Employee Retirement S…PE052623 Retirement Contributions-Pay… 76.75 10888 06/07/2023 Public Employee Retirement S…PE052623 Retirement Contributions-Pay… 452.35 10888 06/07/2023 Public Employee Retirement S…PE052623 Retirement Contributions-Pay… 221.04 10888 06/07/2023 Public Employee Retirement S…PE052623 Retirement Contributions-Pay… 144.65 10888 06/07/2023 Public Employee Retirement S…PE052623 Retirement Contributions-Pay… 605.23 10888 06/07/2023 Public Employee Retirement S…PE052623 Retirement Contributions-Pay… 1,009.65 10888 06/07/2023 Public Employee Retirement S…PE052623 Retirement Contributions-Pay… 1,327.80 10889 06/10/2023 Public Employee Retirement S…June 2023 Employee Health Insurance-Ju… 5,622.96 10889 06/10/2023 Public Employee Retirement S…June 2023 Employee Health Insurance-Ju… 2,623.86 10889 06/10/2023 Public Employee Retirement S…June 2023 Employee Health Insurance-Ju… 1,252.63 Reg CC Mtg, June 20, 2023, Page #15
Warrant Register Payment Dates: 6/7/2023 - 6/20/2023
6/14/2023 12:08:34 PM Page 10 of 16
Payment Number Payment Date Vendor Name Payable Number Description (Item) Amount 10889 06/10/2023 Public Employee Retirement S…June 2023 Employee Health Insurance-Ju… 2,862.97 10889 06/10/2023 Public Employee Retirement S…June 2023 Employee Health Insurance-Ju… 150.49 10889 06/10/2023 Public Employee Retirement S…June 2023 Employee Health Insurance-Ju… 4,283.85 10889 06/10/2023 Public Employee Retirement S…June 2023 Employee Health Insurance-Ju… 652.51 10889 06/10/2023 Public Employee Retirement S…June 2023 Employee Health Insurance-Ju… 4,317.23 10889 06/10/2023 Public Employee Retirement S…June 2023 Employee Health Insurance-Ju… 1,472.29 10889 06/10/2023 Public Employee Retirement S…June 2023 Employee Health Insurance-Ju… 2,564.47 10889 06/10/2023 Public Employee Retirement S…June 2023 Employee Health Insurance-Ju… 4,039.93 10889 06/10/2023 Public Employee Retirement S…June 2023 Employee Health Insurance-Ju… 1,966.50 10889 06/10/2023 Public Employee Retirement S…June 2023 Employee Health Insurance-Ju… 4,259.98 10889 06/10/2023 Public Employee Retirement S…June 2023 Employee Health Insurance-Ju… 1,435.13 10889 06/10/2023 Public Employee Retirement S…June 2023 Employee Health Insurance-Ju… 453.33 10889 06/10/2023 Public Employee Retirement S…June 2023 Employee Health Insurance-Ju… 840.05 10889 06/10/2023 Public Employee Retirement S…June 2023 Employee Health Insurance-Ju… 297.35 10889 06/10/2023 Public Employee Retirement S…June 2023 Employee Health Insurance-Ju… 2,481.32 10889 06/10/2023 Public Employee Retirement S…June 2023 Employee Health Insurance-Ju… 8,460.51 Vendor 4090 - Public Employee Retirement System Total: 75,416.39 Vendor: 12173 - Race Communications
530835 06/20/2023 Race Communications RC912287 Internet Access SBCG June 23 1,530.00 530835 06/20/2023 Race Communications RC912287 Internet Access SBCG June 23 1,530.00 Vendor 12173 - Race Communications Total: 3,060.00
Vendor: 12754 - Recap Advisors, LLC
530836 06/20/2023 Recap Advisors, LLC 0091019 Consulting Svcs-RAD Repositi… 516.25 Vendor 12754 - Recap Advisors, LLC Total: 516.25
Vendor: 9122 - Roland Gutierrez
530837 06/20/2023 Roland Gutierrez 060123 Cardio Salsa Dance Instructor 422.10 Vendor 9122 - Roland Gutierrez Total: 422.10
Vendor: 7517 - Ronald Uyesato
530838 06/20/2023 Ronald Uyesato 1-2023 Camp Lead Staff Fee and Staff… 1,600.00 Vendor 7517 - Ronald Uyesato Total: 1,600.00
Vendor: 3066 - Rusher Air Conditioning
530839 06/20/2023 Rusher Air Conditioning 2095306 Programed Remote for Ductle… 288.00 Vendor 3066 - Rusher Air Conditioning Total: 288.00
Vendor: 7394 - Sharmone P. La Rose
530840 06/20/2023 Sharmone P. La Rose 053023 Recreation-Gentle Yoga Class … 738.50 Vendor 7394 - Sharmone P. La Rose Total: 738.50
Vendor: 7188 - Sharp Business Systems
530841 06/20/2023 Sharp Business Systems 9004366643 BP70C55 Copier Usage 5/1/23… 284.69 Vendor 7188 - Sharp Business Systems Total: 284.69
Vendor: 7233 - Siteone Landscape Supply, LLC
530842 06/20/2023 Siteone Landscape Supply, LLC 130631827-001 Weld-On P-70 Purple Primer 13.32 530842 06/20/2023 Siteone Landscape Supply, LLC 130631827-001 Shrub Rake 30.85 530842 06/20/2023 Siteone Landscape Supply, LLC 130631827-001 Weld-On 711 Gray PVC Cement 17.97 530842 06/20/2023 Siteone Landscape Supply, LLC 130965906-001 24 VAC for 800 and 950 Series… 26.33 530842 06/20/2023 Siteone Landscape Supply, LLC 130965906-001 Handheld Sprayer 1 Gal 109.92 530842 06/20/2023 Siteone Landscape Supply, LLC 130966141-001 Classic Lifeguard Hat 22.86 Vendor 7233 - Siteone Landscape Supply, LLC Total: 221.25 Vendor: 3544 - South Bay Cities Council of Governments
530843 06/20/2023 South Bay Cities Council of Go… June 23 Monthly City Manager's Meet… 40.00 Vendor 3544 - South Bay Cities Council of Governments Total: 40.00 Vendor: 6944 - South Coast A.Q.M.D.
530844 06/20/2023 South Coast A.Q.M.D. 4171712 Cypress Reservoir 153.23 Vendor 6944 - South Coast A.Q.M.D. Total: 153.23
Vendor: 5050 - Southern California Edison Co.
530778 06/13/2023 Southern California Edison Co. 700006214310-060123 Park 599.69 530778 06/13/2023 Southern California Edison Co. 700006214310-060123 Street Lights 31.64 530778 06/13/2023 Southern California Edison Co. 700006214310-060123 Traffic Signals 32.22 Reg CC Mtg, June 20, 2023, Page #16
Warrant Register Payment Dates: 6/7/2023 - 6/20/2023
6/14/2023 12:08:34 PM Page 11 of 16
Payment Number Payment Date Vendor Name Payable Number Description (Item) Amount 530778 06/13/2023 Southern California Edison Co. 700006910888-060623 Railroad Museum 195.27 530778 06/13/2023 Southern California Edison Co. 700007178650-060823 Narbonne Pedestrian Crosswa… 48.79 530778 06/13/2023 Southern California Edison Co. 700008444906-060623 Traffic Signals 661.96 530778 06/13/2023 Southern California Edison Co. 700016714053-060623 Lomita Park 2,392.92 530778 06/13/2023 Southern California Edison Co. 700016714053-060623 Western Pedestrian Crosswalk 16.68 530778 06/13/2023 Southern California Edison Co. 700016714053-060623 Appian Way 288.02 530778 06/13/2023 Southern California Edison Co. 700025877624-060123 Street Lights 573.46 530778 06/13/2023 Southern California Edison Co. 700025957042-060123 Street Lights 255.50 530778 06/13/2023 Southern California Edison Co. 700315793648-060123 Street Lights 182.36 530778 06/13/2023 Southern California Edison Co. 700492524416-060823 Hathaway Park 38.35 Vendor 5050 - Southern California Edison Co. Total: 5,316.86 Vendor: 5040 - Southern California Gas Co.
530845 06/20/2023 Southern California Gas Co. 07370472008-060623 Park Facilities 71.99 530845 06/20/2023 Southern California Gas Co. 07380495007-060623 City Hall Facility 957.33 530845 06/20/2023 Southern California Gas Co. 11360471004-060623 Railroad Museum 1.59 Vendor 5040 - Southern California Gas Co. Total: 1,030.91 Vendor: 1005 - Southern California News Group
530846 06/20/2023 Southern California News Gro… 053123 Ads-Approved Resolution No. … 207.88 530846 06/20/2023 Southern California News Gro… 053123 Ads-Adopted Ordinances No. … 287.02 530846 06/20/2023 Southern California News Gro… 053123 Ads-Adopted Ordinances No. … 318.20 530846 06/20/2023 Southern California News Gro… 053123 Ads-Zone Text Amendment No… 265.43 Vendor 1005 - Southern California News Group Total: 1,078.53 Vendor: 12456 - Sportball
530847 06/20/2023 Sportball 060123 Comprehensive Sports Class 2,350.25 Vendor 12456 - Sportball Total: 2,350.25
Vendor: 12815 - Stetson Engineers Inc.
530848 06/20/2023 Stetson Engineers Inc. 2879-002 Groundwater Well Feasibility … 14,464.00 Vendor 12815 - Stetson Engineers Inc. Total: 14,464.00
Vendor: 3956 - Ted's Plumbing Service Inc.
530849 06/20/2023 Ted's Plumbing Service Inc. 37580 City Yard Restroom-Replace T… 480.00 530849 06/20/2023 Ted's Plumbing Service Inc. 37618 Mainline Stoppage 175.00 Vendor 3956 - Ted's Plumbing Service Inc. Total: 655.00 Vendor: 12855 - Thai Yoga Massage
530850 06/20/2023 Thai Yoga Massage 060723 Refund Duplicate Payment 4,000.00 Vendor 12855 - Thai Yoga Massage Total: 4,000.00
Vendor: 6085 - Thompson Building Materials
530851 06/20/2023 Thompson Building Materials IV-I50312 Lumber Fee 0.43 530851 06/20/2023 Thompson Building Materials IV-I50312 8 X 1-3/4 Wood Screw 100-Bx 12.06 530851 06/20/2023 Thompson Building Materials IV-I50312 9 X 2-1/4 Wood Screw 100-Bx 17.20 530851 06/20/2023 Thompson Building Materials IV-I50312 1 X 3 X 24 Wood Stake 50-Bdl 47.04 530851 06/20/2023 Thompson Building Materials IV-I50312 16 & 48 Level Set 217.24 530851 06/20/2023 Thompson Building Materials IV-I50341 PS 24 Flat Steel Stakes 188.31 Vendor 6085 - Thompson Building Materials Total: 482.28 Vendor: 12170 - T-Mobile
530852 06/20/2023 T-Mobile 052023 City Mobile Internet-Manage… 19.74 530852 06/20/2023 T-Mobile 052023 City Mobile Internet-Code Enf… 25.89 530852 06/20/2023 T-Mobile 052023 City Mobile Internet-Recreati… 29.40 530852 06/20/2023 T-Mobile 052023 City Mobile Internet-Park 6594 25.89 530852 06/20/2023 T-Mobile 052023 City Mobile Internet-Water 40… 29.40 Vendor 12170 - T-Mobile Total: 130.32
Vendor: 12856 - Toilet Partitions Experts, Inc
530853 06/20/2023 Toilet Partitions Experts, Inc 1002 Installation of Toilet Partitions… 2,050.00 Vendor 12856 - Toilet Partitions Experts, Inc Total: 2,050.00 Vendor: 12228 - Toshiba
530854 06/20/2023 Toshiba 34165121 Copier Lease May 23 587.99 Vendor 12228 - Toshiba Total: 587.99
Reg CC Mtg, June 20, 2023, Page #17
Warrant Register Payment Dates: 6/7/2023 - 6/20/2023
6/14/2023 12:08:34 PM Page 12 of 16
Payment Number Payment Date Vendor Name Payable Number Description (Item) Amount Vendor: 7451 - TPX Communications
530855 06/20/2023 TPX Communications 171406716-0 Internet and Phone June 23 1,023.10 530855 06/20/2023 TPX Communications 171406716-0 Internet and Phone June 23 1,023.09 Vendor 7451 - TPX Communications Total: 2,046.19
Vendor: 9100 - Tripepi Smith and Associates
530856 06/20/2023 Tripepi Smith and Associates 10058 Redistricting Services 17,224.00 530856 06/20/2023 Tripepi Smith and Associates 10147 Video Production Services 843.13 530856 06/20/2023 Tripepi Smith and Associates 10192 Citywide Communication & E… 5,360.81 530856 06/20/2023 Tripepi Smith and Associates 10192 Citywide Communication & E… 2,244.34 Vendor 9100 - Tripepi Smith and Associates Total: 25,672.28 Vendor: 3123 - Underground Service Alert/SC
530857 06/20/2023 Underground Service Alert/SC 22-2304212 California State Fee 27.83 530857 06/20/2023 Underground Service Alert/SC 520230420 32 Dig Alerts and Monthly Ma… 66.00 Vendor 3123 - Underground Service Alert/SC Total: 93.83 Vendor: 12279 - United Pacific Services, Inc.
530858 06/20/2023 United Pacific Services, Inc. 23-0525-2 Tree Trimming 12,585.00 530858 06/20/2023 United Pacific Services, Inc. 23-0525-2 Tree Trimming 12,585.00 Vendor 12279 - United Pacific Services, Inc. Total: 25,170.00 Vendor: 6878 - Urban Feet Inc.
530859 06/20/2023 Urban Feet Inc. LOM 060123 Work Boot-R. Mendoza 232.68 Vendor 6878 - Urban Feet Inc. Total: 232.68
Vendor: 7373 - Wells Fargo Vendor Financial Services
530860 06/20/2023 Wells Fargo Vendor Financial … 5025298293 MX-C304W Printer Lease June… 86.01 Vendor 7373 - Wells Fargo Vendor Financial Services Total: 86.01 Vendor: 3044 - West Basin Municipal Water District
10894 06/08/2023 West Basin Municipal Water D…WB6104 April 23 239,709.20 Vendor 3044 - West Basin Municipal Water District Total: 239,709.20 Vendor: 7063 - Westfield Electric
530861 06/20/2023 Westfield Electric 3122 120V Photo Cell 26.80 530861 06/20/2023 Westfield Electric 3122 Replace Photo Cell-Labor 210.00 530861 06/20/2023 Westfield Electric 3207 Trip Charge to Meet with Fiber… 105.00 530861 06/20/2023 Westfield Electric 3216 Photo Cell 26.80 530861 06/20/2023 Westfield Electric 3216 Inspect and Repair Photo Cell-… 262.50 530861 06/20/2023 Westfield Electric 3217 Removed Electrical Wiring & D… 105.00 Vendor 7063 - Westfield Electric Total: 736.10
Vendor: 12701 - William Lawson
530862 06/20/2023 William Lawson 052623 Reimbursement for Code Enfo… 26.46 Vendor 12701 - William Lawson Total: 26.46
Vendor: 7282 - Williams Data Management
530863 06/20/2023 Williams Data Management 0617555 File Storage May 23 304.91 Vendor 7282 - Williams Data Management Total: 304.91
Vendor: 3666 - Yamada Company Inc.
530864 06/20/2023 Yamada Company Inc. 83102 Shindaiwa Blower 429.01 530864 06/20/2023 Yamada Company Inc. 83102 Gas Can 31.63 Vendor 3666 - Yamada Company Inc. Total: 460.64
Vendor: 6102 - Yunex, LLC
530865 06/20/2023 Yunex, LLC 5610283977 Traffic Signal Maintenance Ma… 443.03 530865 06/20/2023 Yunex, LLC 5610283990 Street Light Maintenance May… 169.83 530865 06/20/2023 Yunex, LLC 5620043089 Traffic Signal Response Call Ou… 142.69 Vendor 6102 - Yunex, LLC Total: 755.55
Grand Total: 723,133.93
Reg CC Mtg, June 20, 2023, Page #18
Warrant Register Payment Dates: 6/7/2023 - 6/20/2023
6/14/2023 12:08:34 PM Page 13 of 16
Report Summary
Fund Summary
Fund Payment Amount
100 - General Fund 238,186.81
205 - State Gas Tax 22,239.14
209 - Measure M 3,704.39
211 - Measure W 5,459.73
220 - Proposition A Local Return 1,188.15
245 - Landscape Maintenance District #1 159.16
255 - Park Athletic 4,030.63
311 - Street Improvement 2,974.54
510 - Water Operations 274,875.73
520 - Water Capital 72,212.32
610 - Equipment Replacement 97,536.57
611 - Park Equipment Replacement 566.76
Grand Total: 723,133.93
Account Summary
Account Number Account Name Payment Amount
100-000-2285.000 Employee Association D… 640.00
100-000-2508.000 Garnishment 900.26
100-000-2510.000 PERS 11,798.21
100-000-2515.000 Health Insurance 5,622.96
100-000-2535.000 Accident Insurance 619.35
100-000-2540.000 Dental Insurance 2,973.41
100-000-2550.000 Federal Withholding 18,524.84
100-000-2555.000 State Withholding 6,169.79
100-000-2560.000 Deferred Compensation 12,761.62
100-000-4320.000 Administrative Citations 4,000.00
100-000-4450.000 Museum Admission 100.00
100-110-5207.000 Medicare 9.52
100-110-5217.000 PERS Tier 3 (2%@62) 25.88
100-110-5430.000 Conferences and Meetin… 441.98
100-110-5755.000 Special Department Supp… 139.36
100-120-5305.000 Legal Services 17,224.00
100-125-5205.000 Health Insurance 3,478.32
100-125-5207.000 Medicare 251.64
100-125-5215.000 PERS Tier 1 (2.5%@55) 700.21
100-125-5216.000 PERS Tier 2 (2%@60) 807.58
100-125-5217.000 PERS Tier 3 (2%@62) 308.88
100-125-5345.000 Contractual Services 5,877.06
100-125-5415.000 Communications 19.74
100-125-5430.000 Conferences and Meetin… 3,087.34
100-125-5755.000 Special Department Supp… 12.99
100-130-5205.000 Health Insurance 1,617.34
100-130-5207.000 Medicare 95.91
100-130-5215.000 PERS Tier 1 (2.5%@55) 150.99
100-130-5216.000 PERS Tier 2 (2%@60) 202.35
100-130-5217.000 PERS Tier 3 (2%@62) 257.02
100-130-5410.000 Advertising 823.10
100-130-5420.000 Mileage Reimbursement 24.65
100-130-5425.000 Dues and Memberships 129.00
100-130-5505.000 Office Supplies and Expe… 267.77
100-130-5710.000 Equipment Maintenance 282.31
100-130-5755.000 Special Department Supp… 3,480.14
100-210-5205.000 Health Insurance 3,138.20
100-210-5207.000 Medicare 113.88
100-210-5215.000 PERS Tier 1 (2.5%@55) 230.22
100-210-5216.000 PERS Tier 2 (2%@60) 487.45
100-210-5217.000 PERS Tier 3 (2%@62) 132.61
Reg CC Mtg, June 20, 2023, Page #19
Warrant Register Payment Dates: 6/7/2023 - 6/20/2023
6/14/2023 12:08:34 PM Page 14 of 16
Account Summary
Account Number Account Name Payment Amount
100-210-5345.000 Contractual Services 3,055.69
100-210-5505.000 Office Supplies and Expe… 213.30
100-230-5205.000 Health Insurance 348.61
100-230-5206.000 Health Insurance Retirees 4,283.85
100-230-5207.000 Medicare 27.71
100-230-5217.000 PERS Tier 3 (2%@62) 136.70
100-230-5345.000 Contractual Services 356.00
100-230-5755.000 Special Department Supp… 249.58
100-330-5320.000 Sheriff Contract 1,528.07
100-333-5340.139 Professional Services 15.99
100-333-5520.139 Supplies 193.20
100-333-5755.000 Special Department Supp… 58.85
100-335-5205.000 Health Insurance 652.51
100-335-5207.000 Medicare 65.06
100-335-5345.000 Contractual Services 5,338.80
100-335-5710.000 Equipment Maintenance 26.99
100-410-5205.000 Health Insurance 4,770.14
100-410-5207.000 Medicare 227.06
100-410-5217.000 PERS Tier 3 (2%@62) 1,238.86
100-410-5340.000 Professional Services 114.03
100-410-5345.000 Contractual Services 2,704.91
100-410-5410.000 Advertising 265.43
100-410-5415.000 Communications 25.89
100-410-5430.000 Conferences and Meetin… 1,212.41
100-410-5505.000 Office Supplies and Expe… 190.72
100-410-5720.000 Fuel 59.46
100-410-5755.000 Special Department Supp… 52.41
100-440-5345.000 Contractual Services 19,348.01
100-440-5415.000 Communications 1,512.63
100-440-5525.000 Equipment Under $5k 188.92
100-440-5605.000 Rents and Leases 958.69
100-605-5205.000 Health Insurance 1,727.09
100-605-5207.000 Medicare 111.66
100-605-5216.000 PERS Tier 2 (2%@60) 143.71
100-605-5217.000 PERS Tier 3 (2%@62) 445.89
100-605-5345.000 Contractual Services 8,407.50
100-605-5420.000 Mileage Reimbursement 55.28
100-610-5205.000 Health Insurance 2,840.02
100-610-5207.000 Medicare 116.43
100-610-5216.000 PERS Tier 2 (2%@60) 275.19
100-610-5217.000 PERS Tier 3 (2%@62) 200.83
100-710-5205.000 Health Insurance 4,348.79
100-710-5207.000 Medicare 100.61
100-710-5215.000 PERS Tier 1 (2.5%@55) 819.18
100-710-5217.000 PERS Tier 3 (2%@62) 291.09
100-710-5405.000 Utilities 957.33
100-710-5420.000 Mileage Reimbursement 43.88
100-710-5505.000 Office Supplies and Expe… 60.63
100-710-5705.000 General Maintenance 11,323.13
100-710-5755.000 Special Department Supp… 24.26
100-730-5205.000 Health Insurance 2,171.17
100-730-5207.000 Medicare 206.60
100-730-5215.000 PERS Tier 1 (2.5%@55) 871.14
100-730-5345.000 Contractual Services 11,580.85
100-730-5410.000 Advertising 614.00
100-730-5415.000 Communications 29.40
100-730-5505.000 Office Supplies and Expe… 328.52
100-730-5755.000 Special Department Supp… 99.00
Reg CC Mtg, June 20, 2023, Page #20
Warrant Register Payment Dates: 6/7/2023 - 6/20/2023
6/14/2023 12:08:34 PM Page 15 of 16
Account Summary
Account Number Account Name Payment Amount
100-735-5755.000 Special Department Supp… 43.64
100-735-5755.118 Founder's Day 9,352.46
100-740-5205.000 Health Insurance 4,691.57
100-740-5207.000 Medicare 139.64
100-740-5215.000 PERS Tier 1 (2.5%@55) 276.71
100-740-5216.000 PERS Tier 2 (2%@60) 454.33
100-740-5217.000 PERS Tier 3 (2%@62) 268.50
100-740-5350.000 Tree Trimming Contract 12,585.00
100-740-5405.000 Utilities 3,102.95
100-740-5415.000 Communications 25.89
100-740-5515.000 Uniform Expense 255.54
100-740-5705.000 General Maintenance 580.54
100-740-5710.000 Equipment Maintenance 481.02
100-750-5207.000 Medicare 38.33
100-750-5405.000 Utilities 196.86
100-750-5410.000 Advertising 44.38
100-750-5415.000 Communications 24.29
100-750-5755.000 Special Department Supp… 83.62
205-610-5205.000 Health Insurance 1,721.66
205-610-5207.000 Medicare 77.13
205-610-5217.000 PERS Tier 3 (2%@62) 334.72
205-610-5335.000 Maintenance & License … 755.55
205-610-5405.000 Utilities 2,047.42
205-610-5705.000 General Maintenance 893.30
205-620-5350.000 Tree Trimming Contract 12,585.00
205-620-5705.000 General Maintenance 119.97
205-810-5806.374 Narbonne South Pipe Re… 3,704.39
209-810-5806.374 Narbonne South Pipe Re… 3,704.39
211-347-5340.000 Professional Services 4,379.73
211-347-5771.000 Infrastructure Projects P… 1,012.50
211-810-5806.359 Downtown Lomita Stor… 67.50
220-340-5205.000 Health Insurance 513.80
220-340-5207.000 Medicare 22.67
220-340-5215.000 PERS Tier 1 (2.5%@55) 79.47
220-340-5216.000 PERS Tier 2 (2%@60) 28.11
220-340-5217.000 PERS Tier 3 (2%@62) 45.77
220-340-5345.000 Contractual Services 498.33
245-720-5405.000 Utilities 159.16
255-760-5345.000 Contractual Services 1,600.00
255-760-5506.000 Sport Supplies 2,430.63
311-810-5806.368 Street Reconstruction - … 2,160.00
311-810-5806.380 Sidewalk Improvement P… 814.54
510-000-4715.000 Connection Fees 711.80
510-110-5207.000 Medicare 1.11
510-110-5217.000 PERS Tier 3 (2%@62) 2.88
510-125-5205.000 Health Insurance 936.73
510-125-5207.000 Medicare 60.64
510-125-5215.000 PERS Tier 1 (2.5%@55) 123.57
510-125-5216.000 PERS Tier 2 (2%@60) 269.19
510-130-5205.000 Health Insurance 373.94
510-130-5207.000 Medicare 21.69
510-130-5215.000 PERS Tier 1 (2.5%@55) 34.44
510-130-5216.000 PERS Tier 2 (2%@60) 50.59
510-130-5217.000 PERS Tier 3 (2%@62) 49.29
510-220-5205.000 Health Insurance 2,700.57
510-220-5207.000 Medicare 120.88
510-220-5215.000 PERS Tier 1 (2.5%@55) 76.75
510-220-5216.000 PERS Tier 2 (2%@60) 452.35
Reg CC Mtg, June 20, 2023, Page #21
Warrant Register Payment Dates: 6/7/2023 - 6/20/2023
6/14/2023 12:08:34 PM Page 16 of 16
Account Summary
Account Number Account Name Payment Amount
510-220-5217.000 PERS Tier 3 (2%@62) 221.04
510-220-5345.000 Contractual Services 1,018.56
510-220-5505.000 Office Supplies and Expe… 2,921.56
510-230-5205.000 Health Insurance 198.12
510-230-5207.000 Medicare 28.20
510-230-5217.000 PERS Tier 3 (2%@62) 144.65
510-440-5345.000 Contractual Services 5,491.16
510-440-5415.000 Communications 1,023.09
510-630-5205.000 Health Insurance 10,116.06
510-630-5207.000 Medicare 471.46
510-630-5215.000 PERS Tier 1 (2.5%@55) 605.23
510-630-5216.000 PERS Tier 2 (2%@60) 1,009.65
510-630-5217.000 PERS Tier 3 (2%@62) 1,327.80
510-630-5336.000 Permit & Assessment Fe… 153.23
510-630-5338.000 Underground Service Ale… 93.83
510-630-5340.000 Professional Services 2,244.34
510-630-5345.000 Contractual Services 7.50
510-630-5405.000 Utilities 288.02
510-630-5415.000 Communications 76.48
510-630-5435.000 Training and Education 549.92
510-630-5440.000 Water Purchases - MWD 239,709.20
510-630-5443.000 Water Production Supply… 177.43
510-630-5505.000 Office Supplies and Expe… 30.90
510-630-5510.000 Small Tools 8.80
510-630-5705.000 General Maintenance 876.06
510-630-5755.000 Special Department Supp… 97.02
520-840-5821.239 Appian Way Roof 2,760.00
520-840-5821.357 246th-247th-247th Pl - … 6,240.00
520-840-5821.365 CWPF Upgrades Project 24,665.50
520-840-5821.372 Annual Aged Pipeline R… 6,240.00
520-840-5821.374 Narbonne South Pipe Re… 17,842.82
520-840-5821.377 Second Well Evaluation 14,464.00
610-910-5825.000 Equipment Over $5k 97,536.57
611-910-5705.000 General Maintenance 566.76
Grand Total: 723,133.93
Project Account Summary
Project Account Key Payment Amount
**None** 640,470.79
205-Narbonne South Pipe Replacement 3,704.39
209-Narbonne South Pipe Replacement 3,704.39
211-810 67.50
246th St., 247th Pl., 247th St.-Western 6,240.00
311-Street Reconstruction-Zone G 2,160.00
520-Narbonne South Pipe Replacement 17,842.82
Annual Aged Pipeline R&R 6,240.00
Appian Way Roof 2,760.00
Cypress Water Production 24,665.50
Second Well Evaluation 14,464.00
Sidewalk Improvement Program 814.54
Grand Total: 723,133.93
Reg CC Mtg, June 20, 2023, Page #22
TO: City Council
FROM: Ryan Smoot, City Manager
PREPARED BY: Susan Kamada, Administrative Services Director MEETING DATE: June 20, 2023
SUBJECT: Monthly Report for the Administrative Services Department
RECOMMENDATION
Receive and file the monthly report for the Administrative Services Department.
BACKGROUND
Accounting Activities:
➢ Staff participated in LACMTA’s FY23 Consolidated Audit Kickoff Workshop ➢ Conducted Panel Interview for Accountant (Payroll)
➢ Conducted Finance Committee Meeting
➢ Staff participated in Harassment Training
Department activity levels for the month of May 2023 are provided below:
Journal Entries/Adjustments 8
Payroll Updates/Maintenance Changes 17 / 0 New Hires
Purchase Orders Issued 5
Purchase Orders Paid 16
Invoices Processed for Payment 239
Checks Processed (Demands & Manual) 160
Payroll Checks Processed 172
Business Licenses Issued (New / Renewals) 30/62
Water Utility Bills Mailed/Late Notices Issued Water Utility Bills Mailed 3934 Service Orders Issued (for Water Accounts) 63
OPTIONS:
None. Information only. Receive and file.
Item No. 7c
CITY OF LOMITA
CITY COUNCIL REPORT
Reg CC Mtg, June 20, 2023, Page #23
FISCAL IMPACT
None. Information only. Receive and file.
Reviewed by: Approved by:
________ ____________________________
Gary Y. Sugano Ryan Smoot
Assistant City Manager City Manager
Prepared by:
__________________________
Susan Kamada
Administrative Services Director
Reg CC Mtg, June 20, 2023, Page #24
1 TO: City Council
FROM: Ryan Smoot, City Manager
PREPARED BY: Gary Y. Sugano, Assistant City Manager
MEETING DATE: June 20, 2023
SUBJECT: Monthly Report for the City Manager’s Department
RECOMMENDATION
Receive and file the monthly report for the City Manager’s Department.
BACKGROUND
Information Technology
Numa Networks is currently on-site one day per week to provide as-needed IT support.
During the month of May, Numa Networks assisted with a total of 164 trouble tickets.
Human Resources/Risk Management
The City currently has six (6) open recruitments; Water Service Technician I, Water Service Technician II, and Engineering Intern in the Public Works Department, and Recreation Leader-Parks and Recreation Leader-Receptionist in the Recreation and Facilities Division and Parking Enforcement Supervisor in the City Manager’s Department. The Recreation Supervisor recruitment closed on May 8, 2023.
Applications are currently being reviewed. The most qualified applicants will be invited to participate in a panel interview.
Shelton Bass accepted the position of Accountant/Payroll, in the Administrative Services Department, and began work on June 1, 2023. Gabriel Maldonado accepted the position of Maintenance Aide, in the Public Works Department, and began work on June 5, 2023.
All City Council members and most management staff attended a 2-hour Harassment Prevention training session on May 11, 2023. Training was conducted by Attorney Shauna Amon with BBKLaw.
Item No. 7d
CITY OF LOMITA
CITY COUNCIL REPORT
Reg CC Mtg, June 20, 2023, Page #25
2 Emergency Management
The City was awarded a FEMA Hazard Mitigation Assistance Grant in the amount of $1,124,884.50 for the 247th Street Area Water Main Replacement Project. Design is currently underway but obtaining the necessary permits from the City of Los Angeles took much longer than expected, significantly putting the project behind schedule. The city was granted a one-year extension to complete the project due to this delay. Staff recently reached out to CalOES again to inquire about next steps should the city need to request a budget increase, scope of work change, and/or another time extension related to this project. The City of Los Angeles’ permit fees are much higher than originally estimated, labor and material costs have increased, and potholing revealed oily soil requiring staff to consider detouring the original layout. Staff will review and take appropriate measures to comply with grant requirements.
Staff submitted a Notice of Interest (NOI) to update the City’s Local Hazard Mitigation Plan (LHMP) to the California Governor’s Office of Emergency Services (Cal OES) under the Hazard Mitigation Grant Program (HMPG). On June 7, 2023, staff received notification that FEMA approved the request and awarded Lomita $72,680 for the project costs and $3,622 for grant management costs. Staff had the official “kick-off” meeting with CalOES on June 12 and will be working on releasing an RFP in the near future.
Staff held a meeting with the Area G DMAC to conduct a preliminary review of Lomita’s Emergency Response. Staff anticipates presenting a summary of our review, efforts, and recommendations related to emergency preparedness and management to the City Council in July.
Staff conducted inventory of the pre-positioned antibiotics and returned the expired medication to the County warehouse in Santa Fe Springs on June 13. Staff is also actively working on completing the After Action Report related to COVID-19 which is required by the state.
Lomita Manor
As COVID restrictions continue to be lifted, the Lomita Manor property management company, HumanGood, has restored several activities that have been previously postponed due to COVID. These activities include Exercise/Chair class, Coloring class, and Seasonal Holiday activities such as the St Patrick’s Celebration and Easter Egg Craft. Additional activities that have been added/restored include Bingo, Walking Group and Monthly Celebrations of residents’ birthdays with cake. The property management team will continue to explore additional activities for the residents at Lomita Manor. In addition to these activities, Lomita Manor's Recreation room is open to the residents.
Two different presentations occurred in the month of May for Lomita Manor Residents.
LA County Fire presented on safety preparedness such as earthquakes and fires.
Yellow Cab had a presentation on its Dial-A-Ride program’s benefits.
Reg CC Mtg, June 20, 2023, Page #26
3 Community Development Block Grant Programs
On February 7, 2023, the Community Development Advisory Board (CDAB) approved the CDBG roster (budget) for FY 23-24 in the amount of $140,077 to fund Residential Rehabilitation, Lifeline and the Job Creation and Business Incentive Loan Programs.
Residential Rehabilitation: For Fiscal Year 2023-24, a total of two projects are scheduled to be completed. The new fiscal year will begin next month on July 1st.
Lifeline: The Lifeline program provides emergency response service for a total of 20 subscribers now currently enrolled. The program is accepting applications from Lomita residents who are at least 55 years old or disabled.
City Clerk’s Office
▪ Continued work with ECS Imaging regarding Laserfiche repository improvements ▪ Continued work on agenda management and meeting video streaming project implementation
▪ Staff attended Laserfiche Conference in Long Beach
Administrative staff continues to provide customer service and support related to processing water payments, parking tickets, Dial-a-Ride, planning counter appointments and business licenses.
City Clerk activity for the month of May
Council Meeting Agenda & Minutes Prepared 5/3
Council Resolutions Adopted & Processed 4
Housing Authority Agenda & Minutes Prepared 1/1
Contracts/Agreements Processed 4
Ordinances Adopted & Published 6
Certificates Prepared 13
Public Records Requests Processed 11
Dial-a-Ride New Cards Issued 8
Dial-a-Ride Payments Processed 30
Dial-a-Ride Assistance-Phone/Counter 73
Administrative Parking Appeals Reviewed & Processed 39
Parking Citations Issued & Processed 891
Parking Citations Assistance – Phone/Counter 81
Planning Commission Meeting Agenda & Minutes Prepared 1/1 Planning Commission Resolutions Processed 2
Public Safety & Traffic Commission Agenda & Minutes Prepared 1/1 Technical Traffic Advisory Committee Agenda & Minutes Prepared 0/0 Scanned & Indexed Documents 33
Water Billing Payments and Assistance- Phone/Counter 134 Reg CC Mtg, June 20, 2023, Page #27
4 OPTIONS:
None. Information only. Receive and file.
FISCAL IMPACT
None. Information only. Receive and file.
ATTACHMENTS
None.
Prepared by: Approved by:
___________________________ ___________________________ Gary Sugano Ryan Smoot
Assistant City Manager City Manager
Reg CC Mtg, June 20, 2023, Page #28
1 TO: City Council
FROM: Ryan Smoot, City Manager
PREPARED BY: Brianna Rindge, Community & Economic Development Director MEETING DATE: June 20, 2023
SUBJECT: Monthly Report for the Community & Economic Development Department
RECOMMENDATION
Receive and file the Community & Economic Development Department monthly report.
DISCUSSION
Economic Development
The City of Lomita recently announced grant award winners for our Job Creation and Façade Improvement Programs, and now the projects are coming to life! The Job Creation Program awards up to $10,000 to fund the creation of a new job and the Façade Improvement Program awards up to $25,000 for façade improvements. Both programs are fully funded by the American Rescue Plan Act. As of June 1, four businesses are fully approved:
• Corridor Flow; Job Creation award issued May 16
• Offset Coffee; Job Creation award issued May 22
• Burnin Daylight Brewing Company; Facade Improvement award issued May 22 • Still Got It Fitness; Facade Improvement award issued May 23 Planning
Staff initiated outreach to advise of the updated outdoor dining regulations (Attachments A & B).
o Flyers: placed in lobby & available to Code Enforcement to hand out as needed in the field
o E-newsletter: 4 publications in May & June
o Social media: posted on sites in May
Item No. 7e
CITY OF LOMITA
CITY COUNCIL REPORT
Reg CC Mtg, June 20, 2023, Page #29
2 o Physical newsletter: sent for print in June
o Lomita Chamber Business Meeting: Director attended May 31st with flyers o Founder’s Day Weekend: Director attending with flyers o E-mail sent to businesses who received prior approval through the COVID-19 allowances
The Planning Commission voted to approve the following entitlements for 25820 Lucille Avenue at the May 8, 2023, meeting. The appeal period for each application decision ends June 7, at which point the approval is deemed final and the applicant may apply for building permits.
• site plan amendment to allow:
o 2 previously unpermitted units totaling 1,658 ft2
o previously unpermitted expansion of units 204, 205, & 206 o up to 50% of ground floor space for service uses
• a variance to remove the loading zone requirement
• a minor conditional use permit for a shared parking arrangement Several ordinance discussions will be on Planning Commission and City Council agendas as triggered by applicant requests, observed trends, post-COVID interest, the certified Housing Element, and other State mandates. The draft 2023 upcoming items schedule is as follows.
Topic Council
Discussion
Planning
Commission
Hearing
City Council
Hearings
Building Code update Adopted; in effect Jan. 1, 2023
24000 Crenshaw Specific Plan update Adopted; in effect Feb. 16, 2023 Low-Barrier Navigation Centers Adopted; in effect April 20, 2023 Supportive Housing update Adopted; in effect April 20, 2023 Transitional Housing update Adopted; in effect April 20, 2023 Employee Housing Adopted; in effect April 20, 2023
Reasonable Accommodation update Adopted; in effect April 20, 2023 Covered Parking Adopted; in effect April 20, 2023
Emergency Shelter Parking Adopted; in effect April 20, 2023 Substandard Living Conditions Adopted; in effect April 20, 2023 Unused Zoning Districts clean-up Adopted; in effect April 20, 2023 Designated Parking, Signage Adopted; in effect May 18, 2023 Massage clean-up Adopted; in effect June 1, 2023
Outdoor Dining update Adopted; in effect June 15, 2023
Lot Design clean-up for consistency
with adopted Ord. No. 839 Adopted; in effect June 15, 2023 Chickens update Adopted; in effect June 15, 2023
ADU update Dec. 2022 May 2023 June 2023
Murals March 2023 July 2023 Aug. 2023
Clean-Up to Add Missing Permitted
Uses within Commercial Zones n/a July 2023 Aug. 2023
Reg CC Mtg, June 20, 2023, Page #30
3 This spring, staff completed outreach via the physical and printed newsletters to educate residents about the health & safety importance of clear addresses on structures. This summer, staff will affix door hangers while in the field when appropriate (Attachment C).
Staff met with multiple property owners and developers and completed review of residential and commercial building permits, solar, wireless facilities, business licenses, and Residential Property Reports.
Code Enforcement
The addition of a part-time contract Code
Enforcement officer in February to augment the
full-time officer’s efforts yielded a significant
increase in citywide code compliance, including
enforcement of illegal dumping and graffiti as
shown in the charts.
OPTIONS
None. Information only. Receive and file.
Reviewed by: Approved by:
Gary Y. Sugano Ryan Smoot
Assistant City Manager City Manager
Prepared by:
________________
Brianna Rindge
Community & Economic Development Director
$0
$20,000
$40,000
$60,000
$80,000
18-19 19-20 20-21 21-22 22-23 to
date
Total Citations Issued
per Fiscal Year
0 50
100
150
200
Jul-22
Aug-22Sep-22
Oct-22
Nov-22Dec-22
Jan-23
Feb-23
Mar-23
Apr-23
May-23
# of Cases
Month
Code Enforcement
Activity
FY 22-23
Total Open Cases
Graffiti & Dumping Removed
Closed Cases
New Cases
Reg CC Mtg, June 20, 2023, Page #31
4 Attachment A
Reg CC Mtg, June 20, 2023, Page #32
5 Attachment B
Reg CC Mtg, June 20, 2023, Page #33
6 Attachment C
Reg CC Mtg, June 20, 2023, Page #34
1 TO: City Council
FROM: Ryan Smoot, City Manager
PREPARED BY: Michael M. Sansbury, Recreation & Facilities Manager MEETING DATE: June 20, 2023
SUBJECT: Monthly Report for the Recreation and Facilities Division
RECOMMENDATION
Receive and file the monthly report for the Recreation and Facilities Division.
RECREATION SERVICES
• Summer newsletter has been mailed out to residents.
• Staff is working on Fall Recreation Newsletter.
• Summer sign-ups for non-residents starting on June 1.
• Weekly rentals have increased for end of year school celebrations. • Staff held its annual Memorial Day Ceremony on May 29, 2023, with a solid turnout.
• Staff assisted in this year’s “Follow Me, I am Gang and Drug Free” Walk held on June 2nd with 347 5th graders.
• The Night at the Museum was a big success with approximately 200 guests. • Staff are out promoting this year’s Founders Day weekend. • Founders Day planning and meetings have begun and are on track for success. • Staff are gearing up for summer camps, teen programs, and movies under the stars.
YOUTH SPORTS
• Youth Soccer is ongoing and ends on June 17. There are 333 children enrolled on 24 teams
ADULT SPORTS
• Men’s Basketball leagues to resume in July.
• Soccer leagues begin in July.
CITY OF LOMITA
CITY COUNCIL REPORT
Item No. 7f
Reg CC Mtg, June 20, 2023, Page #35
2 PROGRAM REGISTRATIONS
• Summer registrations begin May 15 for residents and June 1st for non-residents.
MAINTENANCE AND FACILITIES
• Repaired switch at exterior light post next to flagpole at front of City Hall. • Replaced a Flowise elongated toilet in the women's restroom 1st floor at City Hall. • Installed new partitions for the women’s restroom 1st floor at City Hall. • Replaced all 5 AED pads. (3) Lomita Park, (1) City Hall, and (1) at the Railroad Museum.
• Scheduling a major servicing for the emergency generator • Assisting the fiber optic contractor at Lomita Park and City Hall • Replace photocells that control the exterior lighting in the foyer at the entrance of City Hall.
• Purchased and installed 3 new cameras (2) in the interior of the Tom Rico Center and (1) on the exterior of the southside of the Marc Fosnaugh Gymnasium. • The sewer drains were cleared out in the exterior women’s restrooms at the Stephenson Center at Lomita Park.
• Replaced 2 angle stops to the lavatory sink at the City Yard restroom. • Staff replaced the outdoor flags in front of City Hall. The flags were also replaced at Veteran’s Park.
PROJECTS COMPLETED:
• Continued participating in Capital Improvement Project planning sessions with Public Works Department.
• Provided input, data, and information for Request for Proposals for Railroad Museum and Tom Rico Center roofing and rehabilitation projects. • Completed multiple administrative functions to support youth soccer program. • Conducted on-site weekend supervision for youth soccer program. • Trained part-time staff to organize and oversee youth sports programs. • Completed grant applications for a Los Angeles County Supervisor Fourth District. Discretionary Grant for Founder’s Day Entertainment. • Completed marketing materials for Lomita Park Basketball Camp. • Completed Prop 68 progress report.
PROJECTS IN PROGRESS:
• Continuing to oversee youth soccer supervision and training/mentoring part-time staff.
• Researching project funding options for Irene Lewis Park project. Explored combining funding from the LWCF Competitive Program and LA County Measure A Program. Provided additional information to assist Senior Civil Engineer in developing request for proposals for park design.
Reg CC Mtg, June 20, 2023, Page #36
3 • Developing site plans to install tables and benches for Hathaway and Lomita Parks. Tables to be installed on June 14th.
• Monitoring information regarding updates and meetings pertaining to the City’s allotment from LA County Measure A.
• Developing agenda and determining staffing needs for Lomita Park Basketball Camp. Dates June 26-30 and July 24-28.
OPTIONS:
None. Information only. Receive and file.
FISCAL IMPACT
None. Information only. Receive and file.
Reviewed by: Approved by:
Gary Y. Sugano Ryan Smoot
Assistant City Manager City Manager
Prepared by: Prepared by:
Michael M. Sansbury Emma Kelley
Recreation & Facilities Manager Recreation Manager
Reg CC Mtg, June 20, 2023, Page #37
1 TO: City Council
FROM: Ryan Smoot, City Manager
PREPARED BY: Carla Dillon, P.E., Director of Public Works MEETING DATE: June 20, 2023
SUBJECT: Monthly Report for the Public Works Department RECOMMENDATION:
Receive and file the monthly report for the Public Works Department.
BACKGROUND:
Water Division Updates
Cypress Water Production Facility (CWPF) and Distribution System Update Well No. 5 remains offline due to the detection of benzene and the construction project to upgrade the CWPF. The State’s Division of Drinking Water (DDW) and the Los Angeles Regional Water Quality Control Board (RWQCB) have been investigating possible sources of benzene, and information is available at https://www.lomitawater.com/news/.
In May 2023, the City pumped 0.0 acre-feet of groundwater from Well No. 5. All drinking water was supplied with imported water from West Basin MWD. In May 2023, the City imported 160.5 acre-feet from West Basin MWD. Monthly water reports can be found at www.lomitawater.com/oversight/water-quality-reports/.
The City resumed its water tours at the Cypress Water Production Facility in Summer of 2022 after a two-year hiatus. A tour was hosted on May 13th for 6 community members.
Residents who are interested in touring the facility may sign up for a monthly tour at https://www.lomitawater.com/water-tours/.
In May, the annual Consumer Confidence Report (CCR) for 2022 was completed and posted on-line at https://www.lomitawater.com/ccr2022/. This report provides water system information to customers about water quality and is required by the state’s Division of Drinking Water. Customers were alerted to the availability of the report through their water bill, newsletters, and social media.
Item No. 7g
CITY OF LOMITA
CITY COUNCIL REPORT
Reg CC Mtg, June 20, 2023, Page #38
2 The electronic Annual Report (eAR) is an extensive annual report required of water systems through an on-line portal. The report covers many topic areas including service population, connections and types, sources of water, charges, revenue, backflow testing, staff certifications, CIP projects, complaints, and distribution system, among others. The eAR was completed by staff and submitted by the May 11 due date.
Water Division Performance Measures:
Main Breaks/Leak Repairs 1
Service Connection Breaks/Leaks 2
Water Outages 1
Water Service Requests 40
USA Dig-Alert Tickets 84
Dead-end Fire Hydrant Flushing 8
Meter Maintenance 8
Inspection of Water Facilities Daily
Water Quality Complaints 1
Engineering/PW Administration Division Updates
CIP Update
Cypress Water Production Facility (CWPF) Upgrade Project The City’s contractor RC Foster, with the oversight of the contract manager, AKM Consulting Engineers, is progressing on construction. Hazen and Sawyer continue to provide submittal and request for information (RFI) review as well as documentation and support for the permitting with the Division of Drinking Water (DDW).
Progress As of May 31, 2023
Percent Project completion 98%
Overall Project, invoiced/approved $4,324,971
Overall Project budget (approved contracts) $4,835,131
The City shares project updates on https://www.lomitawater.com/ as new information is available. In addition, a short video describing the GAC project and treatment process is available here: https://www.lomitawater.com/infrastructure/granular-activated-carbon/.
Street Reconstruction – Zone G
This project consists of overlaying and reconstructing certain streets in Zones G (just north and south of Lomita Boulevard and east of Eshelman Avenue), as detailed in the Pavement Management Program (PMP). This project includes significant repairs and resurfacing of streets where slurry seal would not be sufficient to extend the life of the street.
Reg CC Mtg, June 20, 2023, Page #39
3 The design of the project was awarded to David Evans and Associates (DEA) in July 2022 and is scheduled to be completed in 2023, and construction is programmed for SpringSummer 2024. Extensive field investigation and sampling have taken place to evaluate the road condition on the 17 streets included in this project. The City has received these technical reports. In addition, DEA is identifying ramps that need upgrades in the project zone, and they are working on detailed design, which is expected in July 2023.
Progress As of May 31, 2023
Percent Project completion 20% (of design)
Overall Project, invoiced/approved $36,481
Overall Project budget $1,200,000
247th Street Area Watermain Project
This project consists of abandoning a watermain that runs north and south within private properties crossing 246th Street, 247th Street, 247th Place, and 248th Street. The proposed new water main will extend from 246th Street beyond the City boundaries, looping within the City of Los Angeles right of way and along Western Avenue (which is Caltrans right of way), and connecting back to the City of Lomita along 247th Street, 247th Place, 248th Street and Lomita Blvd. This project consists of constructing approximately 3,300 linear feet of PVC water pipeline and appurtenances (fire hydrants, valves, services, and fittings). The existing pipeline located in private property will be abandoned.
Design of the project was awarded to Onward Engineering in November 2021. The permit from Caltrans was approved in September 2022. The encroachment permit and traffic control plans were approved by the City of Los Angeles in December 2022. The permit fees for Lomita to work in the City of Los Angeles’ Right-of-Way is approximately $316,000. Lomita staff is exploring options to reduce this fee.
Onward Engineering has completed one round of potholing. A second round of potholing will be completed in June as a pipeline was identified that would conflict with the planned alignment. Following this, the final design will be resubmitted to the City for final review.
Progress As of May 31, 2023
Percent Project completion 85% (of design)
Overall Project, invoiced/approved $102,248
Overall Project budget $1,499,916
Emergency Generator
This project consists of the selection and design of an emergency generator that will be capable of servicing the Appian Way Pump Station as needed. The design of this project was awarded to AEPC Group in July 2022 and is scheduled to be completed in June 2023. Construction of the project was scheduled for Summer 2023; however, this timeline will be reconsidered due to circumstances described below.
For the month of May 2023, AEPC Group addressed comments from the City and delivered the 100% final design package for the project. Due to the long lead time for Reg CC Mtg, June 20, 2023, Page #40
4 generators (~60 weeks), AEPC Group has investigated alternative generators to rent to ensure the City has a backup power source for the Metropolitan Water District shutdown scheduled to begin in November 2023. Quotes for rental generators and quotes for the procurement of the final generator, to be owned by the City, have been received.
Progress As of May 31, 2023
Percent Project completion 95% (of design)
Overall Project, invoiced/approved $52,030
Overall Project budget $76,365
Narbonne Avenue Water Replacement and Street Rehabilitation Project This project consists of constructing approximately 1,600 linear feet of PVC water pipeline on Narbonne Avenue from PCH to the southern end of the City of Lomita. Per the proposed 2015 Water Master Plan, the proposed watermain will be a new 8-inch PVC water main to provide improved flow, pressure, and fire protection. This new water main will replace the existing 1928 6-inch and 8-inch water mains.
Design of the project was awarded to David Evans and Associates in December 2022 and is scheduled to submit a 60% preliminary design package to the City in June 2023.
David Evans and Associates are investigating the current condition of the pavement prior to the 60% submittal. The final PS&E is scheduled to be completed in the third quarter of 2023.
Progress As of May 31, 2023
Percent Project completion 10% (of design)
Overall Project, invoiced/approved $0
Overall Project budget $199,940
New Groundwater Well Feasibility Study
The purpose of this study is to identify preliminary locations where construction of a new groundwater well is feasible. The installation of a new well would minimize the City’s longterm reliance on imported water and provide a contingency well in case of future adverse impacts to Lomita Well No. 5. The City currently has groundwater rights of 1,352-acre feet (ac-ft) in the West Coast Basin, and in its last year of normal operations, CY 2018, Well No. 5 only produced 561 ac-ft of groundwater.
In February 2023, this study was awarded to Stetson Engineering, Inc, who is currently acquiring and reviewing data. A preliminary report is expected to be submitted in June.
The study and final report are scheduled to be completed in July 2023.
Progress As of May 31, 2023
Percent Project completion 35%
Overall Project, invoiced/approved $29,682.75
Overall Project budget $63,135
Reg CC Mtg, June 20, 2023, Page #41
5 Appian Way Pump Station Roof Project
This project will consist of designing and constructing a new roof for the Appian Way Pump Station. The design contract has been awarded to Tetra Tech, Inc. and the team has begun field investigations.
Stephenson Center Maintenance Project
This project consists of design and construction for upgrades to the restroom facilities as well as restoration/replacement of the three-level roof at The Stephenson Center in Lomita Park and upgrades to the men’s and women’s restrooms. The Project design has been awarded to BOA Architecture, and work will begin soon.
Encroachment Permit Review/Approval
For the month of May 2023, staff received and reviewed 18 encroachment permit applications from various utility companies, contractors, and residents. Permits were issued to 15 applicants. Public Works now has an on-line portal for encroachment permitting, available at https://lomitaca.viewpointcloud.com/categories/1081.
Public Safety and Traffic
Public Safety and Traffic Commission (PS&TC) met in May. Staff provided updated on the CIP projects including the Traffic Calming Project. The PS&TC also discussed the “Follow Me, I’m Drug and Gang-Free” Walk, and judged poster submissions. New Commissioner Jessiqa Pace was provided PS&TC information and welcomed.
All new requests for traffic issue investigations are accepted through the on-line OpenGov portal and may be submitted here: https://lomitaca.viewpointcloud.com/categories/1081.
Public Works Field Operations Division (Parks/Street/Trees) Updates The Streets and Trees Division provided maintenance to Palos Verdes Drive North every working Friday, hung street banners, provided weed control to PCH and Lomita Blvd around the planters and medians, cleaned up debris and provided weed control to five alleys, and provided weed control on Narbonne Ave.
Parks Division:
Mowed Park Grounds, number of times 24
Playground Safety Inspections 12
Raised Median/Planter Weeding 33
Park Grounds Fertilize 4
Museum/City Hall Grounds Maintenance 4
Sprinkler Repair/Replacement 18
Trimmed Hedges/Trees (City grounds) 17
Reg CC Mtg, June 20, 2023, Page #42
6 Streets and Trees Division:
Trees Trimmed (by Crew) 43
Trees Trimmed (by Contractor) 113
Trees/Stumps Removed 2
Graffiti Locations Cleaned 74
Sidewalk Maintenance 232
Curb/Gutter Maintenance 30
City Drains Cleaned 41
Street Signs Replaced or Repaired 12
Potholes Filled / Patches 63
New work order requests 4
Backlog of work orders 3
Total Trees Planted 0
Reviewed by: Approved by:
Gary Y. Sugano Ryan Smoot
Assistant City Manager City Manager
Prepared by:
Carla Dillon, PE
Public Works Director
Reg CC Mtg, June 20, 2023, Page #43
1 TO: City Council
FROM: Ryan Smoot, City Manager
PREPARED BY: Susan Kamada, Administrative Services Director MEETING DATE: June 20, 2023
SUBJECT: April 2023 Treasury and Investment Report
RECOMMENDATION
Receive and file the Treasury and Investment Report.
BACKGROUND
Pursuant to Section 41004 of the Government Code of the State of California, the City Treasurer is required to submit a monthly report of all receipts, disbursements and fund balances. The first page of the report summarizes the investment activity for the month and distribution by type of investment, held by the City. The second and third page lists all investments with original maturities exceeding one year as of the month ended April 30, 2023. The fourth page of the report provides a summary of the beginning balance, total receipts, total disbursements, ending balance for all funds, and a listing, by fund, of all month end fund balances.
In summary, all investments of the City of Lomita are in compliance with both the Government Code and our Investment Policy. In addition, the City has sufficient liquidity to meet its expenditure requirements for the ensuing six months.
10.70% of the City’s funds are with the State of California Local Agency Investment Fund (LAIF). The remaining funds of the City of Lomita are in active checking accounts, money market funds, U.S. Treasuries, Federal Agency Securities, Corporate Bonds, and FDIC-insured Negotiable Certificates of Deposit that are in compliance with the California Government Code and the City’s Investment Policy. The current value of each account is obtained from actual monthly statements for the period ending April 30, 2023.
Staff will continue to monitor recent events in the banking industry to safeguard assets held at various banks.
Item No. 7h
CITY OF LOMITA
CITY COUNCIL REPORT
Reg CC Mtg, June 20, 2023, Page #44
2 OPTIONS:
None, information only.
FISCAL IMPACT
None.
ATTACHMENT
1. Treasury and Investment Report for April 2023
Reviewed by: Approved by:
____________________________
Gary Y. Sugano Ryan Smoot
Assistant City Manager City Manager
Prepared by:
__________________________
Susan Kamada
Administrative Services Director
Reg CC Mtg, June 20, 2023, Page #45
City of Lomita
Investment Portfolio Report April 30, 2023
Summary of Cash & Investments Book Value Market Value* Interest Earned Gain (Loss) on
Investment
Local Agency Investment Fund (LAIF) 3,251,193.56 3,251,193.56 21,763.48 0.00 Certificate of Deposit - Negotiable 14,431,000.00 13,717,064.78 28,559.58 0.00 Federal Agency Securities 4,750,000.00 4,490,217.50 6,193.75 0.00 Commerical Paper 2,000,000.00 1,729,620.00 0.00 0.00
US Treasuries 1,000,000.00 990,310.00 0.00 0.00
Total Pooled Investments 25,432,193.56 24,178,405.84 56,516.81 0.00 City of Lomita General Account DDA 4,954,581.87 4,954,581.87 0.00 0.00 Total Cash 4,954,581.87 4,954,581.87 0.00 0.00
Total Cash & Investments 30,386,775.43 29,132,987.71 56,516.81 0.00 City of Lomita
Distribution of Pooled Cash
Local Agency Investment Fund (LAIF) 3,251,193.56 10.70% MTD YTD Certificate of Deposit - Negotiable 14,431,000.00 47.49% Jul-22 9,063.33 9,063.33 Federal Agency Securities 4,750,000.00 15.63% Aug-22 23,738.87 32,802.20 Commerical Paper 2,000,000.00 6.58% Sep-22 47,967.12 80,769.32 US Treasuries 1,000,000.00 3.29% Oct-22 27,178.53 107,947.85 Cash on Hand 4,954,581.87 16.31% Nov-22 24,490.25 132,438.10 Total Cash & Investments 30,386,775.43 100.00% Dec-22 29,003.15 161,441.25 Jan-23 44,965.12 206,406.37
Feb-23 38,269.54 244,675.91
Mar-23 42,610.25 287,286.16
Apr-23 56,516.81 343,802.97
May-23 - 343,802.97
Jun-23 - 343,802.97
343,802.97 343,802.97
*The Governmental Accounting Standards Board (GASB) has established Statement No. 31 for setting investment valuation standards. We report the unrealized gain/(loss) monthly and book realized gain/(loss) at year end as a GASB 31 requirement.
GASB 31 is a reporting requirement that reports the "Fair Value" of investments held in our portfolio. Fair value is the amount at which a financial instrument (investment) could be exchanged in a current transaction between willing parties at current market prices. It is important to understand the relationship between prevailing interest rates and fixed coupon investments. As market interest rates fall, the "Fair Value" of held securities will rise (unrealized Gains). The opposite occurs as market interest rates rise (market prices of held investments will fall). It should be noted that investments held in the city pool are to be held until maturity so both gains and losses (unrealized) will not be taken.
Month to Date & Fiscal Year to Date
Interest Earned/ Gain (Loss) on Total Investments
Distribution of Cash &
Invesments
10.70%
47.49%
15.63%
6.58%
3.29%
83.69%
16.31%
16.31%
100.00%
Local Agency Investment
Fund (LAIF), 11%
Certificate of
Deposit -
Negotiable, 47%
Federal Agency
Securities, 16%
Commerical
Paper, 7%
US Treasuries
Cash on Hand,
16%
Attachment No 1
Reg CC Mtg, June 20, 2023, Page #46
City of Lomita
Investment Portfolio Report April 30, 2023
Account/ Investment Title & Description Account #/
CUSIP
Settlement
Date
Maturity
Date
Yield to
Maturity
Beginning Face
Amount/Shares
Beginning
Market Value Buy Principal Sell Principal
Change in
Market Value
Ending Market
Value
Ending Face
Amount/Shares
Interest
Earned /
(Accrued)
Realized
Gain /(Loss)
On
Investment
Local Agency Investment Fund (LAIF)
City of Lomita XX-XX-469 N/A 2.870% 3,229,430.08 3,229,430.08 21,763.48 - 3,251,193.56 3,251,193.56 21,763.48 - Sub Total / Average 2.870% 3,229,430.08 3,229,430.08 21,763.48 - - 3,251,193.56 3,251,193.56 21,763.48 - Certificate of Deposit - Negotiable
PCSB Bank 69324MAL9 02/21/20 02/21/24 1.650% 248,000.00 240,502.96 - - 1,108.56 241,611.52 248,000.00 347.54 Third Federal S & L Assn 88413QDA3 08/13/21 08/13/24 0.500% 249,000.00 234,129.72 - - 1,232.55 235,362.27 249,000.00 Raymond James Bank NA 75472RBB6 02/14/20 02/14/25 1.750% 248,000.00 233,844.16 - - 543.12 234,387.28 248,000.00 Liberty Federal Credit Union 53052LAP4 03/24/23 03/24/25 5.350% 248,000.00 249,855.04 - (225.68) 249,629.36 248,000.00 Lafayette FCU 50625LAY9 03/31/22 03/31/25 2.200% 249,000.00 235,987.26 - 303.78 236,291.04 249,000.00 465.25 Direct Federal Credit Union 25460FDZ6 02/01/23 05/01/25 4.700% 248,000.00 246,794.72 (210.80) 246,583.92 248,000.00 989.96 JPMorgan Chase Bank NA 48128WCJ2 12/03/21 05/16/25 0.800% 248,000.00 227,460.64 - - 468.72 227,929.36 248,000.00 Institution for Savings Newburyport MA 45780PBL8 05/20/22 05/20/25 3.100% 247,000.00 237,791.84 - - 61.75 237,853.59 247,000.00 650.32 Axiom Bank Maitland FL 05464LBR1 11/30/21 06/13/25 0.700% 249,000.00 226,980.93 - - 480.57 227,461.50 249,000.00 148.04 Bank of Princeton 064520BE8 06/26/20 06/26/25 0.600% 210,000.00 190,728.30 - - 413.70 191,142.00 210,000.00 107.01 Flushing Bank 34387AFF1 11/04/22 11/04/25 4.700% 249,000.00 247,665.36 - (276.39) 247,388.97 249,000.00 993.95 Bankunited NA 066519RX9 12/08/21 12/08/25 1.250% 248,000.00 223,656.32 - - 1,869.92 225,526.24 248,000.00 USAlliance FCU 90352RCD5 01/28/22 01/28/26 1.350% 249,000.00 227,844.46 - (2,834.37) 225,010.10 249,000.00 Liberty First Credit Union 530520AF2 02/03/23 02/03/26 4.400% 249,000.00 246,313.29 (276.39) 246,036.90 249,000.00 951.66 Truliant 89789AAH0 03/22/23 03/23/26 5.150% 248,000.00 249,708.72 - (404.24) 249,304.48 248,000.00 1,084.75 Pentagon FCU 70962LBK7 03/28/22 03/30/26 2.050% 249,000.00 229,236.87 - 129.48 229,366.35 249,000.00 433.53 Kansas State Bank 50116CCV9 03/31/22 03/31/26 2.300% 249,000.00 230,972.40 - 84.66 231,057.06 249,000.00 476.45 Nelnet Bank 64034KAC5 04/15/21 04/15/26 0.700% 248,000.00 218,889.76 - - 295.12 219,184.88 248,000.00 865.62 Community West Bank NA 20415QHQ5 04/23/21 04/23/26 0.700% 248,000.00 218,416.08 - - 376.96 218,793.04 248,000.00 147.44 State BK India New York NY 856285VS7 05/19/21 05/19/26 1.000% 247,000.00 219,291.54 - - 368.03 219,659.57 247,000.00 Toyota Financial Savings Bank 89235MLD1 07/22/21 07/22/26 0.950% 248,000.00 218,329.28 - - 496.00 218,825.28 248,000.00 Medallion BK Salt Lake City 58404DLD1 07/30/21 07/30/26 0.800% 248,000.00 217,012.40 - - 535.68 217,548.08 248,000.00 Sallie Mae Bank 795451AK9 08/11/21 08/11/26 1.100% 248,000.00 219,006.32 - - 513.36 219,519.68 248,000.00 Metro Credit Union 59161YAN6 02/18/22 08/18/26 1.600% 249,000.00 223,382.88 450.69 223,833.57 249,000.00 338.37 Texas Exchange Bank 88241TML1 11/26/21 11/27/26 1.200% 249,000.00 218,128.98 - 749.49 218,878.47 249,000.00 253.78 Beal Bank USA 07371CH69 03/02/22 02/24/27 2.050% 248,000.00 222,956.96 838.24 223,795.20 248,000.00 Capital One Bank USA NA 14042TFP7 04/27/22 04/27/27 2.900% 248,000.00 229,769.52 - - 813.44 230,582.96 248,000.00 3,586.15 Morgan Stanley Bank 61773TDN0 04/29/22 04/29/27 3.000% 246,000.00 228,836.58 - - 829.02 229,665.60 246,000.00 Discover Bank 254673G83 06/14/22 06/14/27 3.150% 246,000.00 229,773.84 - - 733.08 230,506.92 246,000.00 The Dart Bank 237412AN1 06/08/22 06/15/27 3.250% 249,000.00 233,435.01 - - 724.59 234,159.60 249,000.00 687.31 Forbright Bank 34520LAT0 11/02/22 11/02/27 4.600% 249,000.00 246,188.79 - 293.82 246,482.61 249,000.00 972.81 Alliant Credit Union 01882MAC6 12/30/22 12/30/27 5.000% 248,000.00 249,430.96 - 121.52 249,552.48 248,000.00 1,053.15 First Technology Federal 33715LEL0 02/03/23 02/03/28 5.000% 248,000.00 248,111.60 146.32 248,257.92 248,000.00 1,053.15 Alaska USA Federal Credit Union 011852AE0 03/08/23 03/08/28 4.600% 249,000.00 246,265.98 - 42.33 246,308.31 249,000.00 972.81 Central Valley Community Bank 15568PAL0 03/31/23 03/31/28 5.300% 248,000.00 248,456.32 - 19.84 248,476.16 248,000.00 1,080.33 Pacific Western Bank 69506YYD5 04/05/23 04/05/28 5.650% 243,000.00 1,922.13 244,922.13 243,000.00 Goldman Sachs Bank USA 38148PN52 05/30/18 05/30/23 3.250% 245,000.00 244,287.05 - 335.65 244,622.70 245,000.00 Austin TelCo FCU 052392BK2 08/12/22 08/11/23 3.200% 249,000.00 247,361.58 380.97 247,742.55 249,000.00 676.73 General Electric Credit Union 369674CG 9 01/30/23 01/30/24 5.000% 248,000.00 247,727.20 367.04 248,094.24 248,000.00 Grow Financial Federal Credit Union 39981MAC6 03/24/23 03/25/24 5.350% 248,000.00 248,567.92 - 471.20 249,039.12 248,000.00 1,126.87 Wells Fargo Bank 949763ZA7 04/18/19 04/10/24 2.850% 245,000.00 239,480.15 - 923.65 240,403.80 245,000.00 593.03 Live Oak Bkg Co 538036HY3 02/12/20 08/12/24 1.700% 245,000.00 234,180.80 - - 1,021.65 235,202.45 245,000.00 353.74 Capital One Natl Assn 14042RNE7 08/23/19 08/21/24 2.000% 245,000.00 235,045.65 - - 940.80 235,986.45 245,000.00 Morgan Stanley Private Bk Natl Assn 61760AX53 09/05/19 09/05/24 1.900% 100,000.00 95,692.00 - - 380.00 96,072.00 100,000.00 Synchrony Bank 87165FF58 11/30/21 11/29/24 0.850% 245,000.00 228,839.80 - - 923.65 229,763.45 245,000.00 Workers Federal Credit Union 98138MBC3 01/27/23 01/27/25 4.700% 249,000.00 247,794.84 92.13 247,886.97 249,000.00 993.95 Enerbank USA Salt 29278TMZ0 02/14/20 02/14/25 1.650% 245,000.00 230,486.20 - - 561.05 231,047.25 245,000.00 343.34 Merrick Bank 59013KQE9 11/30/21 05/30/25 0.900% 245,000.00 224,694.40 - - 441.00 225,135.40 245,000.00 Spokane Teachers Credit Union 849061AA4 11/23/22 11/24/25 5.000% 248,000.00 248,508.40 - (337.28) 248 Reg CC Mtg, June 20, 2023, Page #47
,171.12 248,000.00 1,053.15
City of Lomita
Investment Portfolio Report April 30, 2023
Account/ Investment Title & Description Account #/
CUSIP
Settlement
Date
Maturity
Date
Yield to
Maturity
Beginning Face
Amount/Shares
Beginning
Market Value Buy Principal Sell Principal
Change in
Market Value
Ending Market
Value
Ending Face
Amount/Shares
Interest
Earned /
(Accrued)
Realized
Gain /(Loss)
On
Investment
Eaglemark Savings Bank 27004PBD4 04/07/21 04/07/26 0.700% 245,000.00 216,440.35 - - 284.20 216,724.55 245,000.00 855.15 Greenstate Credit Union 39573LBL1 06/16/21 06/16/26 0.900% 249,000.00 219,438.72 - - 438.24 219,876.96 249,000.00 190.33 UBS Bk USA Salt Lake 90348JQ29 07/14/21 07/14/26 0.900% 249,000.00 218,768.91 - - 493.02 219,261.93 249,000.00 190.33 Bank of Frankewing 06221LAE3 11/09/22 11/09/26 4.950% 248,000.00 247,950.40 - 14.88 247,965.28 248,000.00 1,042.62 Baxter Credit Union 07181JAU8 11/22/22 11/23/26 5.000% 248,000.00 248,734.08 - 136.40 248,870.48 248,000.00 1,053.15 Celtic Bank 15118RZT7 11/30/22 11/30/26 4.800% 249,000.00 248,071.23 - 186.75 248,257.98 249,000.00 Dept of Commerce Federal CU 24951TAT2 05/13/22 05/13/27 3.250% 249,000.00 233,674.05 - - 774.39 234,448.44 249,000.00 687.31 BMO Harris Bank NA 05600XFW5 06/15/22 06/15/27 3.300% 249,000.00 233,873.25 - - 719.61 234,592.86 249,000.00 697.88 Numerica Credit Union 67054NBC6 11/04/22 11/04/27 4.950% 248,000.00 248,768.80 - 235.60 249,004.40 248,000.00 1,042.62 University Bk Ann 914098DQ8 04/03/23 04/03/28 4.850% 248,000.00 - 248,000.00 248,000.00 Sub Total / Average 2.831% 13,940,000.00 13,203,541.57 491,000.00 - 22,523.20 13,717,064.78 14,431,000.00 28,559.58 - Federal Agency Securities
Federal Home LN BKS 3130APXC4 12/10/21 12/10/24 1.100% 1,000,000.00 947,210.00 - - (2,340.00) 944,870.00 1,000,000.00 Federal Home LN BKS 3130ALMM3 03/30/21 03/30/26 1.000% 250,000.00 227,287.50 - - 727.50 228,015.00 250,000.00 - Federal Home LN BKS 3130AR2B6 03/08/22 03/08/27 2.375% 500,000.00 468,845.00 - (935.00) 467,910.00 500,000.00 Federal Home LN BKS 3130ARDY4 03/29/22 03/29/27 2.500% 500,000.00 470,320.00 - (955.00) 469,365.00 500,000.00 Federal Home LN BKS 3130ARGQ8 04/14/22 04/14/27 2.875% 250,000.00 237,807.50 - (490.00) 237,317.50 250,000.00 3,593.75 Federal Home LN BKS 3130ASD22 06/29/22 06/29/27 3.590% 250,000.00 241,685.00 - (600.00) 241,085.00 250,000.00 Federal Home LN MTG 3134GXL28 08/17/22 08/17/27 4.150% 250,000.00 243,082.50 - 660.00 243,742.50 250,000.00 Federal Home LN MTG 3134GXQ23 08/25/22 08/25/27 4.250% 250,000.00 244,890.00 - (657.50) 244,232.50 250,000.00 Federal Home LN MTG 3134GY3F7 11/22/22 11/22/27 5.125% 250,000.00 251,280.00 - (1,190.00) 250,090.00 250,000.00 Federal Home LN MTG 3134GYF31 01/30/23 01/27/28 5.100% 250,000.00 247,947.50 (777.50) 247,170.00 250,000.00 Federal Farm Credit Bank 3133ENCD0 11/30/21 10/27/25 1.040% 500,000.00 463,115.00 - - (405.00) 462,710.00 500,000.00 2,600.00 Federal Farm Credit Bank 3133EMB76 05/26/21 05/26/26 0.950% 500,000.00 453,990.00 - - (280.00) 453,710.00 500,000.00 - Sub Total / Average 2.838% 4,750,000.00 4,497,460.00 - - (7,242.50) 4,490,217.50 4,750,000.00 6,193.75 - Commerical Paper
Bank of America Corp A2 06048WM31 05/28/21 05/28/26 1.250% 1,000,000.00 861,640.00 - - 10,600.00 872,240.00 1,000,000.00 Goldman Sachs Corp A2 38150AFK6 04/30/21 04/30/26 1.550% 500,000.00 445,600.00 - - 1,855.00 447,455.00 500,000.00 JPMorgan Chase & Co 48128G4R8 08/17/21 08/17/26 1.150% 500,000.00 407,480.00 - - 2,445.00 409,925.00 500,000.00 Sub Total / Average 1.317% 2,000,000.00 1,714,720.00 - - 14,900.00 1,729,620.00 2,000,000.00 - - U.S. Treasuries
US Treasury Note 06048WM31 07/28/22 07/31/23 1.250% 1,000,000.00 988,360.00 - - 1,950.00 990,310.00 1,000,000.00 Sub Total / Average 1.250% 1,000,000.00 988,360.00 - - 1,950.00 990,310.00 1,000,000.00 - - Total / Average - Investments 2.22% 24,919,430.08 23,633,511.65 512,763.48 - 32,130.70 24,178,405.84 25,432,193.56 56,516.81 - Demand Deposit Account (DDA)
Pacific Western - General Account XXXX259 N/A N/A 0.000% 4,982,359.87 N/A N/A N/A N/A 4,982,359.87 4,982,359.87 N/A N/A (Outstanding Checks) N/A N/A (27,778.00) N/A N/A N/A N/A (27,778.00) (27,778.00) N/A N/A Sub Total / Average 0.000% 4,954,581.87 4,954,581.87 4,954,581.87 - - Total /Cash & Investments 29,874,011.95 23,633,511.65 512,763.48 - 32,130.70 29,132,987.71 30,386,775.43 56,516.81 - Reg CC Mtg, June 20, 2023, Page #48
City of Lomita
Investment Portfolio Report April 30, 2023
Previous Balance $ 3,365,116.79
Deposits 3,098,727.77
Disbursements (1,478,728.29)
Adjustments (2,756.40)
Current Balance 4,982,359.87
General Fund - City Operations
General Fund - City Operations including LAIF and Investments 100 8,866,138.94 Sub Total - General Fund - City Operations including LAIF and Investments 8,866,138.94 Special Revenue Funds
OPEB Trust Fund - Retiree Health Care 201 251,296.06
Pension Stabilization Fund 202 1,319,077.98
Economic Development 203 746,506.98
General Plan Update 204 200,000.00
Gas Tax Fund - Street Maintenance 205 1,097,401.48
Measure R Local Fund - Street Projects 207 645,690.58
Measure R Highway Fund - Street Projects 208 (106,536.84) Measure M Fund - Street Projects 209 657,844.12
Economic Stabilization 210 500,000.00
Measure W Fund - Safe Clean Water Program 211 217,769.61 American Rescue Plan 212 3,400,324.00
CDBG Fund - Housing Programs 215 (1,664.26)
Proposition A Fund - Transportation Projects 220 500,908.58 Proposition C Fund - Transportation Projects 225 2,319,157.28 Transportation Development Act Article 3- Transportation Projects 230 (13,537.51) Air Quality Fund - Air Quality Projects 235 56,360.36
Landscape Maintenance Fund - Landscape Maintenance District 245 9,730.37 Park Facilities Fee Fund - Quimby Funds 250 453,893.07
Park Athletic Fund - Park Athlete Programs 255 98,313.72 Park Grant Fund - Park Improvement Programs 257 (0.06)
Lomita Manor Fund - Federal Housing Program 260 197,505.04 CA Law Enf. Equip. Program (CLEEP) Fund - Public Safety Equip. 276 6,221.38 Sub Total - Special Revenue Funds 12,556,261.94
Capital Improvement Funds
Capital Improvement Fund - Capital Improvement Projects 310 184,572.79 Street Improvement Fund - Street Improvement Projects 311 1,218,857.54 Facilities Improvement Fund - Facilities Improvement Projects 312 317,744.23 Stephenson Center Fund - Facilities Improvement Projects 313 85,744.47 Sub Total - Capital Improvement Funds 1,806,919.03
GENERAL LEDGER CASH BALANCES
Reg CC Mtg, June 20, 2023, Page #49
City of Lomita
Investment Portfolio Report April 30, 2023
Previous Balance $ 3,365,116.79
Deposits 3,098,727.77
Disbursements (1,478,728.29)
Adjustments (2,756.40)
Current Balance 4,982,359.87
Proprietary Funds
Water Operations Fund - Water Operations 510 3,965,937.51 Water Capital Fund - Water Capital Projects 520 686,119.91 Rate Stabilization - Cypress Reservoir Bond 530 125,000.00 Internal Service Fund - Equipment Replacement 610 1,185,275.47 PK Equipment Replacement Fund 611 674,291.71
Sewer Replacement Fund 612 500,000.00
Sub Total - Proprietary Funds 7,136,624.60
Trust and Agency Funds
Museum Foundation Fund - Railroad Museum Programs 720 21,240.67 Tom Rico Memorial Fund - Park Program Scholarships 730 (409.75) Sub Total - Trust & Agency Funds 20,830.92
Total 30,386,775.43
Pooled Cash 999 (25,404,415.56)
Grand Total 4,982,359.87
Reg CC Mtg, June 20, 2023, Page #50
1 TO: City Council
FROM: Ryan Smoot, City Manager
PREPARED BY: Laura MacMorran, Associate Planner
MEETING DATE: June 20, 2023
SUBJECT: Second Reading and Adoption of Ordinance No. 854 for Zoning Text Amendment No. 2023-06, Amending Lomita Municipal Code Title XI (Planning and Zoning) Modifying Accessory Dwelling Unit (ADU) Regulations, and Finding the Action to be Exempt from the California Environmental Quality Act
RECOMMENDATION
Adopt ordinance.
BACKGROUND
On June 6, 2023, the City Council introduced on first reading an ordinance amending various sections of Lomita Municipal Code Title XI (Planning and Zoning) pertaining to accessory dwelling units (ADUs), and to find the project statutorily exempt from the California Environmental Quality Act. This agenda item is to approve the second reading and adoption of the ordinance.
OPTIONS:
1. Approve the attached ordinance.
2. Do not approve the ordinance.
3. Provide staff with further direction.
FISCAL IMPACT
None.
ATTACHMENTS
1. Ordinance No. 854
Item No. 7i
CITY OF LOMITA
CITY COUNCIL REPORT
Reg CC Mtg, June 20, 2023, Page #51
2 Reviewed by: Approved by:
Gary Y. Sugano Ryan Smoot
Assistant City Manager City Manager
Reviewed by: Prepared by:
________________ ________________ ___
Brianna Rindge Laura MacMorran
Community & Economic Development Director Associate Planner Reg CC Mtg, June 20, 2023, Page #52
Attachment 1
ORDINANCE NO. 854
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF LOMITA
AMENDING LOMITA MUNICIPAL CODE TITLE XI (PLANNING AND
ZONING), CHAPTER 1 (ZONING), REVISING THE CITY’S
REGULATIONS FOR ACCESSORY DWELLING UNITS AND A
DETERMINATION THAT THE PROJECT IS CATEGORICALLY EXEMPT
FROM THE CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA).
THE CITY COUNCIL OF THE CITY OF LOMITA HEREBY ORDAINS AS FOLLOWS:
Section 1. Recitals
A. An existing ordinance addressing accessory dwelling units and junior accessory dwelling units is codified in Title XI of the Lomita Municipal Code.
B. The City desires to amend Title XI of the Lomita Municipal Code to amend its accessory dwelling unit regulations as necessary to bring them into compliance with Government Code Sections 65852.2 and 65852.22 while retaining local control to the maximum extent permitted under these state law provisions.
C. Government Code Section 65852.2(a)(1)(B) authorizes cities to impose standards on accessory dwelling units in conformance with state law that include, but are not limited to, parking, height, setback, landscape, architectural review, maximum unit size, and standards that prevent adverse impacts on any real property that is listed in the California Register of Historic Resources.
D. Government Code Section 65852.2(h)(A) provides that the state Department of Housing and Community Development (HCD) is to make findings regarding local agency ordinance compliance with Section 65852.2.
E. On May 8, 2023, the Planning Commission held a duly noticed public hearing on Zone Text Amendment No. 2023-06 where public testimony was accepted on the item and recommended City Council approval.
F. On June 6, 2023, City Council held a duly noticed public hearing to consider the proposed text amendment regarding Accessory Dwelling Units.
Section 2. General Plan
This Ordinance’s amendments to Title XI of the Lomita Municipal Code are consistent with, and in furtherance of, the City’s adopted General Plan as they effectuate the following Policies of the General Plan:
A. Program 6 requires the City to adopt an amendment to the City’s Zoning Code consistent with or less restrictive than State requirements, by spring 2023. This Reg CC Mtg, June 20, 2023, Page #53
Ordinance No. 854
ordinance is consistent with state law and incentivizes better design by allowing an accessory dwelling unit to have the same height as the principal dwelling unit when meeting the zoning district’s principal dwelling unit setbacks.
B. Goal 2’s Policy 2.2 commits the City to modify ordinances intended to address a variety of housing types, and Goal 4’s Policy 4.4 commits the City to expand opportunities for housing access for those with special housing needs. Accessory dwelling units that exceed 800 square feet or are converted from existing structures adding more than 150 square feet shall design specific building components to accommodate a wheelchair.
Section 3. Environmental Review
The City Council finds and determines that the adoption of an ordinance regarding Accessory Dwelling Units (ADUs) in a single-family or multifamily residential zone to implement the provisions of Government Code Sections 65852.2 and 65852.22 is exempt from CEQA review pursuant to Public Resources Code Section 21080.17. Therefore, this ordinance does not require any environmental review under CEQA.
The Recitals above are true and correct and are hereby adopted as findings as if fully set forth herein.
THE CITY COUNCIL OF THE CITY OF LOMITA HEREBY ORDAINS AS FOLLOWS:
Section 4. Zoning Amendments
Based on the foregoing, the City Council hereby approves the following amendments to the Lomita Municipal Code:
A. Section 11-1.30.06 (“Accessory and junior accessory dwelling units”) of Article 30 (“Residential Zones”) of Chapter 1 (“Zoning”) of Title XI of the Lomita Municipal Code is hereby amended in its entirety to read as follows:
“Section 11-1.30.06. - Accessory and junior accessory dwelling units. (A) Purpose.
(1) The purpose of this section is to provide for the creation of accessory dwelling units and junior accessory dwelling units consistent with Sections 65852.2 and 65852.22 of the Government Code, as amended from time to time. In any instance where there is conflict, state law shall govern.
(B) Definitions.
Reg CC Mtg, June 20, 2023, Page #54
Ordinance No. 854
(1) Accessory dwelling unit/ADU has the same meaning as that stated in Government Code Section 65852.2 as that section may be amended from time to time.
(2) Attached or Attached ADU means an ADU that shares at least one common wall with the primary dwelling unit.
(3) Converted ADU means an ADU that is constructed within all or a portion of the legally permitted existing interior space of an accessory structure or within all or a portion of the permitted existing interior space of a dwelling structure, including bedrooms, attached garages, and storage areas.
(4) Detached or Detached ADU means an ADU that is physically separated from, but located on the same lot as, a primary dwelling unit. (5) Existing. A structure is "existing" if it was legally constructed, and the construction has passed all required final inspections. (6) Junior accessory dwelling unit/JADU is a unit no more than five hundred (500) square feet in size and contained entirely within a proposed or existing single-family dwelling or within the walls of a garage attached to an existing single-family dwelling. It shall include permanent provisions for living, sleeping, eating, and cooking. (7) Public transit has the same meaning as that stated in Government Code Section 65852.2 as that section may be amended from time to time.
(8) Floor area of an accessory dwelling unit means, for the purpose of this section, the area of each floor level included within the walls enclosing each dwelling unit. The floor area shall be measured from the outside face of the walls enclosing each dwelling unit including all closet space and storage areas contained within the unit, including habitable basements and attics, but not including unenclosed porches, balconies, or any enclosed garages or carports. For purposes of calculating allowable floor area of accessory dwelling units based on a proportion of the size of the primary residence, only the livable floor area of the primary residence shall be counted. The floor area of any other structures, for purposes of calculating total floor area, lot coverage, or other calculations, shall be calculated in the manner described in the relevant zoning regulations.
(C)Applicability and permissible use.
(1) Accessory dwelling units required by state law. ADUs required by state law are allowed on lots located within a residential or mixed-use zone as provided in Section 65852.2(e) of the Government Code, in compliance with all applicable provisions of subsection (E) of this section, development standards and requirements, except for those provisions which do not allow an ADU otherwise in compliance with Reg CC Mtg, June 20, 2023, Page #55
Ordinance No. 854
Section 65852.2(e) of the Government Code. An ADU pursuant to Section 65852.2(e)(1)(B) of the Government Code shall be limited to a maximum floor area size of eight hundred (800) square feet. The combination of ADU categories set forth in Section 65852.2(e)(A) through (D) of the Government Code is prohibited.
(2) Applications for ADUs and JADUs shall be approved or denied within sixty (60) days from the date the city receives a complete application if there is an existing single-family or multifamily dwelling on the lot. If the application to create an ADU or a JADU is submitted with a permit application to create a new single-family dwelling or multifamily dwelling on the lot, the city may delay acting on the application for the ADU or the JADU until the city acts on the permit application to create the new single-family dwelling or multifamily dwelling, but the application to create the ADU or JADU shall be considered without discretionary review or hearing. If the applicant requests a delay, the sixty (60) day time period shall be tolled for the period of the delay. (3) Approval of a permit for the creation of an ADU or JADU shall not be conditioned on the correction of nonconforming zoning conditions, building code violations, or unpermitted structures on the subject property. However, this does not prevent the city from enforcing compliance with applicable building standards in accordance with California Health and Safety Code Section 17980.12.
(4) For the purpose of this section, a structure with two (2) or more attached dwellings on a single lot is considered a multifamily dwelling structure. Multiple detached single-family dwellings on the same lot are not considered multifamily dwellings. A lot with multiple detached single-family dwellings is eligible for creation of one (1) ADU per lot by converting space within the proposed or existing space of a singlefamily dwelling or existing structure or new construction of a detached ADU.
(5) It is prohibited to convert existing floor area or construct an ADU without first obtaining approval and issuance of a building permit. Such permit shall be issued if it is determined that the ADU will conform to the provisions of this section.
(6) ADUs of less than seven hundred fifty (750) square feet in size shall be exempt from all impact fees. ADUs of greater than 750 square feet in size shall be charged impact fees established by city council resolution. Such fees shall be charged proportionately in relation to the square footage of the primary dwelling unit.
(D)State-exempt accessory dwelling units and junior accessory dwelling units. (1) Within a residential zone or the Mixed-Use Overlay District, all development standards (including, but not limited to lot coverage, floor area ratio, required building separation, and open space) are reduced Reg CC Mtg, June 20, 2023, Page #56
Ordinance No. 854
solely to the extent necessary to allow one (1) of the following solely through building permit:
a. One (1) ADU and one (1) JADU on a lot if all of the following apply:
1. Each unit is located either:
(i) Within the space of a proposed single-family dwelling; or (ii) Within the space of an existing single-family dwelling or accessory structure;
2. Each unit maintains exterior access that is independent of that for the primary single-family dwelling;
3. Each unit maintains side and rear setbacks sufficient for fire and safety, as dictated by applicable building and fire codes;
4. The JADU complies with the requirements of California Government Code Sec. 65852.22; and
5. Each unit may include an expansion of not more than one hundred fifty (150) square feet beyond the physical
dimensions of the existing accessory structure; such
expansion beyond the physical dimensions of the existing accessory structure is limited to accommodating ingress and egress.
b. One (1) ADU and one (1) JADU per lot if all of the following apply:
1. The ADU is detached, new construction on a lot with a proposed or existing single-family dwelling;
2. The ADU is eight hundred (800) square feet or less;
3. The height of the ADU does not exceed the applicable height limit in subsection (E)(2) of this section;
4. The ADU maintains at least four (4) feoot side and rear yard setbacks;
5. The ADU complies with applicable front yard setbacks; and
6. The JADU complies with subsection (D)(1)(a) of this section. c. On a lot with an existing or proposed multifamily dwelling, up to two (2) detached ADUs that are eight hundred (800) square feet or less and which have a height not exceeding the applicable height limit in subsection (E)(2), and which comply with setbacks of at least four (4) feet from the side and rear yards, and which comply with front yard setbacks, provided that, If the existing multifamily dwelling has a rear or side yard setback of less than four (4) feet, the city will not require any modification to the existing multifamily dwelling as a condition of approving the ADU.
Reg CC Mtg, June 20, 2023, Page #57
Ordinance No. 854
d. Converted on existing multifamily building. No more than twentyfive (25) percent of the number of the existing units, but at least one (1) unit, shall be permitted as ADUs constructed within the non-livable space and shall be enclosed on at least three (3) sides (e.g., storage rooms, boiler rooms, attics, basements, or garages) of the existing multifamily dwelling structure provided that applicable building codes are met; fractions shall be rounded down to the next lower number of dwelling units, except that at least one (1) ADU shall be allowed.
(E) Development standards and requirements for accessory dwelling units. (1) Number of units.
a. For lots with an existing or proposed single-family dwelling, one (1) ADU shall be allowed on a lot.
b. For lots with an existing or proposed multifamily residential dwelling structure
1. No more than twenty-five (25) percent of the number of the existing units, but at least one unit, shall be permitted as ADUs constructed within the non-livable space and are enclosed on at least three (3) sides (e.g., storage rooms, boiler rooms, attics, basements, or garages) of the existing multifamily dwelling structure provided that applicable building codes are met; Fractions shall be rounded down to the next lower
number of dwelling units, except that at least one (1) ADU shall be allowed.
2. Up to two (2) ADUs shall be permitted as detached from the multifamily residential structure and may be attached or detached to each other.
(2) Height.
a. Detached ADUs on a lot with an existing or proposed single family or multifamily dwelling unit and complying with a four (4) feet side and four (4) feet rear setback shall not exceed a height of sixteen (16) feet.
b. On a lot that is within one-half of one (0.5) mile walking distance of a major transit stop or a high-quality transit corridor, as those terms are defined in Section 21155 of the Public Resources Code, detached ADUs complying with a four (4) foot side and four (4) foot rear setback shall not exceed a height of eighteen (18) feet. For such ADUs, an additional two feet in height is allowed to accommodate a roof pitch on the ADU that is aligned with the roof pitch of the primary dwelling unit.
c. On a lot with an existing or proposed multifamily, multistory dwelling, detached ADUs complying with a four (4) foot side and Reg CC Mtg, June 20, 2023, Page #58
Ordinance No. 854
four (4) foot rear setback shall not exceed a height of eighteen (18) feet.
d. A height of twenty-five (25) feet or the maximum height of the principal structure according to Section 11-1.30.02 of this Code, whichever is lower, is the height limit for an ADU that is attached to the principal dwelling. Pursuant to Section 11-1.70.11, residential lots south of Pacific Coast Highway shall obtain a height variation permit for an attached ADU over sixteen (16) feet in height measured from the natural grade. Converted area from the existing dwelling is exempt from this requirement.
e. An attached or detached ADU complying with the setback requirements of the underlying zone shall not exceed sixteen (16) feet at one story and twenty-seven (27) feet at two (2) stories.
ADUs shall not exceed two (2) stories. Pursuant to Section 11-
1.70.11, residential lots south of Pacific Coast Highway shall obtain a height variation permit for an attached ADU over sixteen (16) feet in height measured from the natural grade. Converted area from the existing dwelling is exempt from this requirement. (3) Setbacks.
a. Front yard. Twenty (20) feet to a front property line.
1. Secondary front. Ten (10) feet to property line.
b. Side yard. Four (4) feet to a side property line.
c. Rear yard. Four (4) feet to a rear property line.
d. Building separation. Six (6) feet to the exterior wall of a dwelling, garage, or accessory structure located on the same lot. e. Setbacks required by utility easements and recorded setbacks shall be maintained. No portion of an ADU shall be constructed on a public or private easement. Roof eaves may not be
eliminated to meet this requirement.
f. No setback is required for an existing living area or existing accessory structure constructed in the same location and to the same dimensions as an existing structure that is converted to an ADU or to a portion of an ADU.
g. ADUs are not eligible for modifications to yard setbacks pursuant to Article 70.
(4) Lot coverage. An ADU exceeding eight hundred (800) square feet shall comply with the lot coverage and floor area ratio of underlying zone requirements of Article 30.
(5) Useable open space. ADUs exceeding eight hundred (800) square feet shall provide, at a minimum, a continuous private recreation area Reg CC Mtg, June 20, 2023, Page #59
Ordinance No. 854
of two hundred twenty-five (225) square feet with minimum interior dimensions of ten (10) feet. The private recreation shall be open and unobstructed from the ground to the sky and may be located within the interior, street side, or rear setback areas.
(6) Floor area size.
a. Maximum floor area size for new construction units.
1. Attached ADUs with zero (0) bedrooms or one (1) bedroom are subject to a maximum size of eight hundred fifty (850) square feet or fifty (50) percent of the size of the dwelling unit, whichever is less.
2. Attached ADUs with two (2) or more bedrooms are subject to a maximum size of one thousand (1,000) square feet or fifty (50) percent of the size of the dwelling unit, whichever is less, and in no event less than eight hundred (800) square feet.
3. Attached or detached ADUs located on lots with multifamily dwelling structures shall not exceed eight hundred (800) square feet each.
4. Detached ADUs with zero (0) bedrooms or one bedroom are subject to a maximum size of eight hundred fifty (850) square feet.
5. Detached ADUs with two (2) or more bedrooms are subject to a maximum size of one thousand (1,000) square feet.
b. Minimum floor area size. An attached or detached ADU shall provide a minimum floor area no less than one hundred fifty (150) square feet.
c. Converted floor area size. The conversion of an existing accessory structure or a portion of the existing primary dwelling to an ADU is not subject to the maximum floor area size requirement when no expansion or addition is proposed beyond the physical dimensions of the structure or dwelling other than an expansion of not more than one hundred fifty (150) square feet limited to accommodating ingress and egress for the purpose of an ADU; otherwise the converted floor area size shall be governed by the maximum floor area size requirement.
d. An ADU shall not be subject to the accessory buildings and structures requirements of Section 11-1.30.05.
e. Accessory structures including, but not limited to garages and patios attached to ADUs shall comply with Section 11-1.30.05 - accessory buildings and structures.
(7) Floor area ratio. In general, the floor area ratio for all ADUs shall be subject to the floor area ratio requirements of Section 11-1.30.02.
Reg CC Mtg, June 20, 2023, Page #60
Ordinance No. 854
However, ADUs which are eight hundred (800) square feet or less are exempt from floor area ratio calculation.
(8) Density. For purposes of calculating allowable density under the General Plan and Zoning Code an ADU is an accessory use that does not count toward the allowable density for the lot.
(9) Parking and vehicular access.
a. One (1) parking space is required per ADU.
b. Parking shall be located on the same lot containing the ADU and may be provided as tandem parking on a driveway. Parking shall conform to the requirements of Article 66 of this Code. c. Parking for the ADU is waived pursuant to Section 65825.2(d)(1) through (5) of the Government Code.
d. Replacement parking is not required if a garage or covered parking structure is demolished in conjunction with the construction of an ADU or converted to an ADU.
(10) City and public utilities.
a. All ADUs must be connected to public utilities, or their private equivalent, including water, electric, and sewer services. For example, if required by the building standards code, dwelling units that are proposed to be installed on a property with only septic tanks are prohibited.
b. Except for ADUs created solely by converting an existing singlefamily dwelling or a single-family accessory structure, the city may require a separate utility connection.
(11) Design standards applicable to new construction of ADUs exceeding eight hundred (800) square feet and ADUs converted from existing structures adding more than one hundred fifty (150) square feet. a. Building architecture including roof type, roof pitch, exterior materials, finishes, and color shall match the primary dwelling. b. Address numerals of all dwelling units shall be clearly visible from the street or displayed in a building directory.
c. ADUs shall have a main entrance separate from the primary dwelling and shall not have an interior connection to any other dwelling unit.
d. New entry door shall not open directly toward an alley. e. Replacement of the garage door shall include a new façade. The new façade shall include a minimum of one window or entryway. f. Entryway shall include an exterior light fixture.
Reg CC Mtg, June 20, 2023, Page #61
Ordinance No. 854
g. Tree preservation: Any plans for an addition or new construction shall identify the location of any mature trees onsite and provide protective measures to ensure preservation of mature trees. A mature tree is defined as any tree having a main trunk or stem measuring twenty-four (24) inches in diameter, or seventy-five (75) inches in circumference, measured at a height of four and one-half (4½) feet above ground level at the root crown. A removal includes moving a tree or removing more than one-third of a tree's vegetation. Sites without an existing mature tree must provide at least two (2) twenty-four (24) inch box trees within the front yard setback or open space area.
(12) Owner-occupancy. Subject to the requirements of California Government Code Sec. 65852.2.
(13) Covenant restriction. Prior to issuance of the building permit for an ADU, a covenant restriction, approved by the city attorney, shall be recorded with the Los Angeles County Recorder's Office, which shall include the pertinent restrictions and limitations of an ADU identified in this section. Said covenant restriction shall run with the land, and shall be binding upon any future owners, heirs, or assigns. A copy of the recorded covenant restriction shall be filed with the community development department as part of the building permit application. The recorded covenant restriction shall state that:
a. The ADU shall not be sold, or title transferred separate and apart from the remainder of the property, except as provided in Section 65852.26 of the Government Code; and
b. The ADU shall be restricted to the floor area and height allowed per the development standards at the time of building permit issuance;
c. Any owner-occupancy requirement shall be consistent with California Government Code Sec. 65852.2. If the state allows the city to require owner-occupancy, the ADU shall be considered legal only so long as the owner resides at the property built with the ADU.
d. The ADU shall not be operated as a short-term rental or rented for a period less than thirty (30) days; and
e. The restrictions shall be binding upon any successor in ownership of the property and lack of compliance with this provision may result in legal action against the property owner, including revocation of any right to maintain an ADU on the property.
Reg CC Mtg, June 20, 2023, Page #62
Ordinance No. 854
(15) Illegal ADUs. This section shall not validate any existing illegal ADUs.
Any conversions from illegal units to a conforming legal ADU shall be considered a new ADU subject to the provisions of this section. a. Effective January 1, 2020, the property owner of a lot containing an ADU built before January 1, 2020, that receives a notice to correct a violation of building standards may submit an application to the community development department
requesting that enforcement of the violation be delayed for up to five (5) years on the basis that correcting the violation is not necessary to protect health and safety as determined by the building official; provided, that all other violations not related to the ADU are corrected. This provision shall expire January 1, 2030, as provided in state law.
(F) Junior accessory dwelling units.
(1) Purpose. The purpose of this section, junior accessory dwelling units, is to provide for the creation of junior accessory dwelling units consistent with California Government Code Section 65852.22, as amended from time to time. In any instance where there is conflict, state law shall govern.
(2) Applicability and permissible use.
a. One (1) JADU is allowed per residential lot zoned for single-family residences with a single-family residence built, or proposed to be built, on the lot.
b.
c. JADUs are prohibited on lots that contain multiple detached single-family dwellings.
(3) Development standards and requirements. JADUs shall comply with the following development standards and requirements:
a. Number of units. One (1) JADU shall be allowed on a lot. b. Owner-occupancy. The property owner shall reside on the lot.
The owner may reside in the remaining portion of the singlefamily dwelling or the newly created JADU. c. A JADU shall not be operated as a short-term rental or rented for a period less than thirty (30) days.
d. Covenant restriction. A covenant restriction shall be completed and recorded, as provided in subsection (13) of this section. e. Location of JADU. A JADU shall be created within the walls of a proposed or existing single-family dwelling, or within the walls of a garage attached to an existing single-family dwelling.
Reg CC Mtg, June 20, 2023, Page #63
Ordinance No. 854
f. Separate entry required. An exterior entrance is required for all JADUs, independent of the exterior entrance for the single-family dwelling, and shall not open directly toward an alley.
g. Kitchen requirements. The JADU shall include an efficiency kitchen, which includes a cooking facility with appliances, a food preparation counter, and storage cabinets that are reasonable to size of the unit.
h. Common sanitation. Where a JADU shares the bathroom
facilities contained in the single-family dwelling, a direct unobstructed interior connection shall be provided at all times between the JADU and the bathroom facilities, and the interior connection shall not require passage through a locked door (except for a privacy lock on the bathroom door) or passage outside of the gross floor area of the JADU or single-family dwelling.
(4) Design standards.
a. Building architecture, exterior materials, finishes and color shall match the primary dwelling.
b. Address numerals of all dwelling units shall be clearly visible from the street or displayed in a building directory.
c. JADUs shall have a main entrance separate from the primary dwelling.
d. New entry door shall not open directly toward an alley. e. Replacement of the garage door shall include a new façade. The new façade shall include a minimum of one window or entryway. f. Entryway shall include an exterior light fixture.
(5) Parking. No parking is required for the JADU beyond the required parking for the proposed or existing single-family dwelling. However, replacement parking for the existing single-family dwelling is required when an attached garage or portion thereof is converted to a JADU.
Parking shall conform to the requirements of Article 66 of this Code. (6) Setbacks and other zoning regulations. The JADU shall be considered a part of the single-family dwelling and shall be subject to the same requirements of the underlying zoning district as required for the single-family dwelling.
(7) Density. For purposes of calculating allowable density under the general plan and zoning code a JADU is an accessory use that does not count toward the allowable density for the lot.
(8) Maximum floor area. A JADU shall not exceed five hundred (500) square feet in floor area.
Reg CC Mtg, June 20, 2023, Page #64
Ordinance No. 854
(9) Minimum floor area. A JADU shall provide a minimum floor area no less than one hundred fifty (150) square feet.
(10) Utility service. For purposes of providing service for water, sewer, or power, including a connection fee, a JADU shall not be considered a separate or new dwelling unit. An inspection may be assessed to confirm the JADU complies with development standards.
(11) Illegal JADUs. This section shall not validate any existing illegal JADUs. Any conversions from illegal units to a conforming legal JADU shall be considered a new JADU subject to the provisions of this section.
(12) Covenant restriction.
a. Prior to issuance of the building permit for a JADU, a covenant restriction, approved by the city attorney, shall be recorded with the Los Angeles County Recorder's Office, which shall include the pertinent restrictions and limitations of a JADU identified in this section. Said covenant restriction shall run with the land, and shall be binding upon any future owners, heirs, or assigns. A copy of the recorded covenant restriction shall be filed with the community development department as part of the building permit application. The recorded covenant restriction shall state that:
1. The JADU shall not be sold separately from the single-family dwelling;
2. The JADU shall be restricted to the maximum size allowed per the development standards;
3. The JADU shall be considered legal only so long as either the single-family dwelling or the JADU is occupied by the property owner;
4. The JADU shall not be operated as a short-term rental or rented for periods less than thirty (30) days;
5. The restrictions shall be binding upon any successor in ownership of the property and lack of compliance with this provision may result in legal action against the property owner, including revocation of any right to maintain a JADU on the property.
Section 5.
If any section, subsection, subdivision, paragraph, sentence, clause or phrase of this ordinance or any part hereof is for any reason held to be invalid, such invalidity shall not affect the validity of the remaining portions of this ordinance or any part thereof. The City Council of the City of Lomita hereby declares that it would have passed each section, subsection, subdivision, paragraph, sentence, clause or phrase hereof, irrespective of the Reg CC Mtg, June 20, 2023, Page #65
Ordinance No. 854
fact that any one or more sections, subsections, subdivisions, paragraphs, sentences, clauses or phrases be declared invalid.
Section 6 . Effective Date
This ordinance shall take effect thirty (30) days after the date of its passage; and prior to fifteen (15) days after its passage, the City Clerk shall cause a copy of this ordinance to be published in accordance with the provisions of the law. The City Clerk shall certify the adoption of this ordinance.
____________________________
Barry Waite, Mayor
PASSED, APPROVED, AND ADOPTED this
ATTEST:
____________________________
Kathleen Horn Gregory, MMC, City Clerk
APPROVED AS TO FORM:
____________________________
Trevor Rusin, City Attorney
6th day of June 2023.
Reg CC Mtg, June 20, 2023, Page #66
1 TO: City Council
FROM: Ryan Smoot, City Manager
REVIEWED BY: Carla Dillon, P.E., Public Works Director
PREPARED BY: Ryan Damon, Associate Engineer
MEETING DATE: June 20, 2023
SUBJECT: Consideration of Purchase of Emergency Standby Generator at Appian Way Project
RECOMMENDATIONS
1) Authorize staff to release the bid package for the Emergency Standby Generator at Appian Way project;
2) Approve the purchase of a standby generator and load bank in the amount of $219,476.40;
3) Authorize the rental of a generator for up to $47,537.79; 4) Reappropriate $57,970 from 520-840-5820.134 from FY 22-23 to FY 23-24; 5) Appropriate $348,414.19 to 520-840-5820.134 for FY 23-24; 6) Find this project Categorically exempt from CEQA; and 7) Authorize the City Manager to execute the Purchase Orders for Standby Generator, Rental Generator and Load Bank
BACKGROUND
Appian Way Pressure Reducing and Pump Station (Pump Station) has the ability to reduce pressure or pump water, as well as monitor and control water pressures throughout the City. The Pump Station, however, does not have back-up power.
Periodically, the Metropolitan Water District (MWD) switches the source of water for Lomita Water to a lower pressure source, and this necessitates the continuous use of pumps at the Pump Station. If the power were interrupted, water pressure and supply to certain areas of the City could be affected. In November 2023, MWD is scheduled to begin construction of the Second Lower Feeder PCCP Rehabilitation – Reach 3B Project. This scope of their project includes installing a 75” liner to rehabilitate the existing 78” concrete pipe. The project spans multiple cities, and the duration of this Item No. 7j
CITY OF LOMITA
CITY COUNCIL REPORT
Reg CC Mtg, June 20, 2023, Page #67
2 project is expected to last two years, with one year of construction activities within City limits. During this period, the City will have no backup power source for the Pump Station.
The purpose of the Emergency Standby Generator at Appian Way Project is to install electrical connections at the Pump Station so a mobile standby generator may be used if there is a loss of power. This is critical to ensure water supply will remain unaffected throughout the Lomita Water service area.
A previous investigation of the Pump Station identified a need for a minimum 180 kW back-up emergency generator, as identified and recommended in the 2015 CIP Master Plan. The generation system will be rated as a backup source of power for the Pump Station located outdoors with an integral fuel tank. Currently, the existing vertical water pumps at the Pump Station are driven by electrical motors operating on commercial outsourced power. It was recommended that a standby generator be installed to compensate for the loss of electrical power outage during emergency situations.
In July 2022, the City Council awarded a Professional Services Agreement to AEPC Group, LLC for engineering design services in the amount of $65,535 plus a 15% contingency in the amount of $9,830. The design of the Standby Power Generator at Appian Way Project is completed, and the project is ready to be released for bid. This project will address the electrical connections needed to power a standby generator.
However, the procurement of the equipment with extensive lead times will be purchased directly by the City to reduce the overall time for delivery.
The average lead time for a generator, sized to handle the Pump Station’s electrical load, ranges from 13-38 weeks. In addition to the standby generator, the procurement of a load bank was highly recommended by the AEPC Group. A load bank is a device that provides a controlled electrical load that exercises and maintains the life of a generator.
Monthly use of a load bank is essential to ensure the generator’s long-term functionality.
The average lead time for the procurement of a load bank ranges from 50-60 weeks. To ensure that the City has a backup power source prior to the start of MWD’s construction and other possible electrical interruptions, a rental generator will also be needed. The lead time for the procurement of the rental generator varies, but due to availability, securing the rental as early as possible is crucial.
The City plans to procure the standby generator and load bank outside of the construction contract of the Project. By doing so, the total cost will not have contractor markups and it will shorten the rental generator period. Three separate quotes for the generator and load bank were obtained. The total cost and expected lead time were factored into the selection. The supplier, Gen-Tech provided the lowest cost and shortest lead time for both items. The final cost for the generator and load bank is $219,476.40. This cost includes sales tax, delivery, startup testing, and a 10% contingency. The lead time for the generator is expected to be 13-15 weeks and the lead time for the load bank is roughly 33-43 weeks.
Three quotes were received for the procurement of a rental generator for a period of five Reg CC Mtg, June 20, 2023, Page #68
3 and a half months, beginning in early September 2023. The lowest quote that was received was from United Rentals for $47,537.79. The City expects the five and a half months to be sufficient time for the selected contractor to install all electrical connections at the pump station prior to the start of MWD’s construction. The rental generator will be tested on-site and only used in case of an emergency. Once the City’s permanent standby generator has been procured and successfully tested, the rental generator may be returned.
The procurement of the standby generator, rental generator and load bank is expected to begin in early July in Fiscal Year 2023-24.
CEQA
The City Council finds that adoption of this Ordinance is not subject to CEQA pursuant to CEQA Guidelines, Section 15269 (c) Emergency Projects. The installation and use of the standby generator can be found to be exempt from the requirements of CEQA. The proposed project consists of electrical elements to ensure connectivity with the standby generator. If primary power is lost, the standby generator will allow the AWPS to run and maintain normal operations. The purpose of the generator is to support the station as needed, and it is not anticipated to be used in any circumstances other than to prevent an emergency event.
FISCAL IMPACT
The Engineer’s Estimate provided by AEPC Group for this project with contingency is $81,400. The procurement cost of the generator and load bank with contingency is $219,476.40. The cost of the rental generator for five and a half months is $47,537.79.
The total cost of all items related to the project is $348,414.19.
Funds for the design engineering services for this project will need to be reappropriated to FY 23-24 in account 520-840-5820.134 in the amount of $57,970. Funds will need to be appropriated from Water Capital Funds to account 520-840-5820.134 for FY 23-24 (348,414.19). There are sufficient funds available for this transfer.
OPTIONS
1. Approve staff’s recommendation.
2. Provide alternative direction.
ATTACHMENTS
1. Design Plans and Bid Documents
2. CEQA Notice of Exemption
3. Quote Solicitation for Standby Generator and Load Bank
4. Quote Solicitation for Rental Generator
Reg CC Mtg, June 20, 2023, Page #69
4 Reviewed by: Approved by:
________ ___________________________
Gary Y. Sugano Ryan Smoot
Assistant City Manager City Manager
Reviewed by: Prepared by:
_______________________ ______________________
Carla Dillon, P.E. Ryan Damon
Public Works Director Associate Engineer
Reg CC Mtg, June 20, 2023, Page #70
PROJECT REQUIREMENTS
SHEET INDEX
PROJECT INFORMATION
LOCATION MAP
SITE PLAN
N.T.S.
N.T.S.
ARCHITECTURAL
ELECTRICAL
R
Know what'sbelow.
Call before you dig.
Southern California Office
18565 SOLEDAD CANYON RD SUITE #210
SANTA CLARITA, CA 91351
TELEPHONE: 949-224-1590
FACSIMILE: 949-269-7954
Attachment No 1
Reg CC Mtg, June 20, 2023, Page #71
APPIAN WAY
SITE PLAN
-1
SHEET NOTES:
KEY NOTES:
R
Know what'sbelow.
Call before you dig.
Southern California Office
18565 SOLEDAD CANYON RD SUITE #210
SANTA CLARITA, CA 91351
TELEPHONE: 949-224-1590
FACSIMILE: 949-269-7954
Reg CC Mtg, June 20, 2023, Page #72
ELECTRICAL SYMBOLS (NOT ALL SYMBOLS ARE APPLICABLE)
ELECTRICAL ABBREVIATIONS
GENERAL ELECTRICAL NOTES (NOT ALL NOTES APPLICABLE)
GROUNDING NOTES:
R
Know what'sbelow.
Call before you dig.
Southern California Office
18565 SOLEDAD CANYON RD SUITE #210
SANTA CLARITA, CA 91351
TELEPHONE: 949-224-1590
FACSIMILE: 949-269-7954
GROUNDING NOTES:
Reg CC Mtg, June 20, 2023, Page #73
APPIAN WAY
R
Know what'sbelow.
Call before you dig.
Southern California Office
18565 SOLEDAD CANYON RD SUITE #210
SANTA CLARITA, CA 91351
TELEPHONE: 949-224-1590
FACSIMILE: 949-269-7954
GENERAL NOTES:
ELECTRICAL SITE PLAN
-1
Reg CC Mtg, June 20, 2023, Page #74
R
Know what'sbelow.
Call before you dig.
Southern California Office
18565 SOLEDAD CANYON RD SUITE #210
SANTA CLARITA, CA 91351
TELEPHONE: 949-224-1590
FACSIMILE: 949-269-7954
GENERAL NOTES:
ELECTRICAL FLOOR PLAN
-1
KEY NOTES:
Reg CC Mtg, June 20, 2023, Page #75
R
Know what'sbelow.
Call before you dig.
Southern California Office
18565 SOLEDAD CANYON RD SUITE #210
SANTA CLARITA, CA 91351
TELEPHONE: 949-224-1590
FACSIMILE: 949-269-7954
GENERAL NOTES:
KEY NOTES:
SINGLE LINE DIAGRAM
Reg CC Mtg, June 20, 2023, Page #76
R
Know what'sbelow.
Call before you dig.
Southern California Office
18565 SOLEDAD CANYON RD SUITE #210
SANTA CLARITA, CA 91351
TELEPHONE: 949-224-1590
FACSIMILE: 949-269-7954
DETAIL NOTES:
TYPICAL CONDUIT RISER 2
-
CONDUIT THRU EXTERIOR WALL 3
CABINET MOUNTING DETAIL 1
- GENERATOR QUICK CONNECT
Reg CC Mtg, June 20, 2023, Page #77
CITY OF LOMITA
24300 Narbonne Avenue
Lomita, CA 90717
CONTRACT DOCUMENTS AND SPECIFICATIONS
FOR
STANDBY POWER GENERATOR AT APPIAN WAY
BID OPENING
MONTH, DATE, 2023
XX:XX P.M.
Under the Supervision of:
__ ___ XX-XX-2023_____________
Aleksei Isen, PE Date
MONTH 2023
Reg CC Mtg, June 20, 2023, Page #78
A-1
TABLE OF CONTENTS
SECTION A-NOTICE INVITING BIDS (A)
NOTICE INVITING BIDS..……………………………………………………... A-2
SECTION B-INSTRUCTIONS TO BIDDERS (B)
I. QUALIFICATION OF BIDDERS ……..………………………………..…….. B-2
II. BIDDER’S RESPONSIBILITY ………………………………………………. B-3
III. ADDENDA TO CONTRACT DOCUMENT ………...……………………... B-3 IV. PREPARATION OF THE BID ………………..……………………………. B-4
V. BID BOND …………………………………………………………………….. B-5
VI. NON-RESPONSIVE BIDS AND REJECTION ………...…………………. B-5 VII. AWARD OF CONTRACT …………………………………………………. B-5
VIII. EXECUTION OF CONTRACT ……………………………………………. B-5
IX. APPRENTICESHIP EMPLOYMENT STANDARDS ……………………. B-6
X. PERMIT, LICENSE AND PUBLIC WORKS AGREEMENT …………..... B-6 XI. INSURANCE ………………………………………………………………… B-6
XII. PRE-BID INQUIRIES ……………………………………………………… B-6
XIII. LABOR CODE – SB 854 …………………………………………………. B-6
XIV. PREVAILING WAGE ……………………………………………………. B-6
XV. GUIDELINES DURING COVID-19 PANDEMIC…………………………. B-6
SECTION C-BID DOCUMENTS
BIDDERS PROPOSAL …………………………………………………….…… C-2
CONTRACTOR’S AFFIDAVIT ……………………………………………….… C-7
BID BOND (10%) ………………………………….……………………………. C-9
LIST OF SUBCONTRACTORS ……………………………………………….. C-10
CONSTRUCTION PROJECT REFERENCES………………………….……. C-11
VIOLATIONS OF FEDERAL, STATE OR LOCAL LAWS ……..……….…... C-12 DISQUALIFICATION OR DEBARMENT …………………………..…….…... C-13
SECTION D – DOCUMENTS TO BE COMPLETED AND DELIVERED TO CITY
AFTER AWARD OF CONTRACT
PUBLIC WORKS AGREEMENT ................................................................. D-2 CONSTRUCTION OR SERVICE CONTRACT ENDORSEMENT ...............D-11 PERFORMANCE BOND ............................................................................. D-13 LABOR AND MATERIAL BOND ……………………………………............... D-15 WORKERS' COMPENSATION INSURANCE CERTIFICATION..................D-18
SECTION E - SPECIAL PROVISIONS
SECTION F – ELECTRICAL SPECIFICATIONS
APPENDIX I - CONSTRUCTION AND DEMOLITION DEBRIS RECYCLING SUMMARY
APPENDIX II - CITY BUSINESS LICENSE APPLICATION
APPENDIX III - CITY OF LOMITA STANDARD PLANS
Reg CC Mtg, June 20, 2023, Page #79
A-2
SECTION A
NOTICE INVITING BIDS
Reg CC Mtg, June 20, 2023, Page #80
A-3
CITY OF LOMITA, CALIFORNIA
NOTICE INVITING BIDS
NOTICE IS HEREBY GIVEN that the City of Lomita, County of Los Angeles, California (hereinafter “City”) will receive sealed bids at the Office of the City Clerk, City Hall, 24300 Narbonne Avenue, Lomita CA 90717 until XX:00 PM on Day, Month XX, 2023 at which time all bids will be publicly opened and read in the City Council Chamber at the above address for:
STANDBY POWER GENERATOR AT APPIAN WAY
This project consists of new mobile generator and modifications to existing electrical distribution system at the City Of Lomita Public Works facility. The work to be done, in general, consists of furnishing all material, tools, equipment, and incidentals to perform the work as specified on drawings.
The Contractor shall perform all work required for such construction in accordance with the Contract Documents and subject to the terms and conditions of the Contract, complete and ready for use.
Each bid must be submitted in writing on a bid proposal furnished by the City. Bids must conform and be responsive to all contract documents. All bids must be sealed and must be plainly marked in the lower left-hand corner “STANDBY POWER GENERATOR AT APPIAN WAY”.
Plans and Specifications may be downloaded and printed from the City’s website at no charge at:
http://www.lomita.com/cityhall/business/index.cfm?p=bids_RFP/index.cfm Prospective bidders who only view and/or print the Plans and Specifications from the City’s website will not automatically be added to the City’s Plan Holder list for this project unless they send an email to the to the Project Manager at [email protected] and provide the firm’s name, address, telephone and contact person with a valid email address. This will ensure that the prospective bidder is listed as a “Plan Holder” and will be informed of any addenda and all information issued subsequent to obtaining the official form of proposal.
Addenda will be posted on the City website, but it shall be the bidder’s responsibility to inquire for any addenda/updates to this Notice Inviting Bid prior to submitting their bid.
Reg CC Mtg, June 20, 2023, Page #81
A-4
Each proposal must be accompanied by a cash deposit, a certified or cashier's check, or a bidder's bond, made payable to the City of Lomita, in an amount not less than 10 percent of the total bid submitted.
The successful bidder will be required to furnish a faithful performance bond in the amount of 100 percent of the contract price, and a payment bond in the amount of 100 percent of the contract price, both in a form satisfactory to the City Attorney. The successful bidder will also be required to pay the State of California prevailing wage scale as determined by the Department of Industrial Relations, available at http://www.dir.ca.gov/Public-Works/PublicWorks.html.
The City reserves the right to reject any or all bids and to waive any informality or irregularity in any bid received and to be the sole judge of the merits of the respective bids received. The award, if made, will be made to the lowest responsible bidder. Plans and Specifications will be available for review at City Hall.
The contractor shall possess a valid State of California Contractors License, Class A.
All work shall be completed within 30 working days from the date of the Notice to Proceed (NTP). Contractor shall provide testing of entire electrical system per electrical specifications provided with this project.
All questions regarding this bid must be submitted in writing on or before XX:00 PM on Day, Month XX, 2023, to the Project Manager, via email at [email protected].
Kathleen Horn Gregory, CMC,
City Clerk
Publish in Daily Breeze on February 3rd and February 10th, 2022 Reg CC Mtg, June 20, 2023, Page #82
B-1
SECTION B
INSTRUCTIONS TO BIDDERS
Reg CC Mtg, June 20, 2023, Page #83
B-2
INSTRUCTIONS TO BIDDERS
I. QUALIFICATION OF BIDDERS
1. Competency of Bidders
The Bidder shall be thoroughly competent and capable of satisfactorily performing the Work covered by the Bid. As specified in the Bid Documents, the Bidder shall furnish statements of previous experience on similar work. When requested, the Bidder shall also furnish the plan of procedure proposed; the organization, machinery, plant and other equipment available for the Work; evidence of its financial condition and resources; and any other such documentation as may be required by the City to determine if the Bidder is responsible.
2. Contractor's License
At the time of submitting the Bid, the Bidder shall be licensed as a contractor in accordance with the provisions of Chapter 9, Division 3, of the California Business and Professions Code. The required prime contractor license for this project is a Class A Contractor’s license. However, the City reserves the right to award the Contract to a contractor with another class if the City determines that the license is proper for the work.
3. Contractor Registration Requirements
SB 854 amended the Labor Code to require all contractors bidding on public work to register with the Department of Industrial Relations (DIR) and to pay an annual fee. The registration requires contractors to provide the State with evidence of the contractors' compliance with a number of statutory requirements. The registration requirement took effect on July 1, 2014.
4. Bidder’s Submittal and Contract Award Prohibited
Under California Labor Code section 1771.1, as amended by SB 854, unless registered with the DIR, a contractor may not bid, nor be listed as a subcontractor, for any bid proposal submitted for public work on or after March 1, 2015. Similarly, a public entity cannot award a public work contract to a non-registered contractor, effective April 1, 2015. Also refer to Section 5-3.1 of the Special Provisions.
5. Bidder Qualifications
Bidder Qualifications called for to be submitted at the time of bid include, but are not necessarily limited to:
Reg CC Mtg, June 20, 2023, Page #84
B-3
a. The Contractor shall have been in business under the same name and California Contractor’s License for a minimum of 10 continuous years prior to the bid opening date for this project. The license used to satisfy this requirement shall be of the same type as required by the contract. b. The Contractor shall provide a minimum of 3 references for the construction of street rehabilitation projects which have been successfully completed in the State of California with a construction cost of at least $2M. during the past 5 years
c. The Contractor or the Subcontractor performing the construction of street rehabilitation shall have a minimum of 10 years’ experience under the same name and California Contractor’s License
d. The Contractor shall perform above 50% of the contract with its own forces.
II. BIDDER RESPONSIBILITY
A responsible Bidder is a Bidder who has demonstrated the attribute of trustworthiness, as well as ability, fitness, capacity and experience to satisfactorily perform the work.
Bidders are notified that, in accordance with the Lomita Municipal Code, the City Council may determine whether the Bidder is responsible based on a review of the Bidder's performance on other contracts.
If, based on the provisions and criteria set forth in the Lomita Municipal Code, the Public Works Director proposes not to recommend the award of contract to the apparent low bidder, the Director shall notify the Bidder in writing of its intention to recommend to the City Council that the Council award the contract to the 2nd lowest responsible bidder. If the Bidder presents evidence in rebuttal to the recommendation, the Director shall evaluate the merits of such evidence, and based on that evaluation, make a recommendation to the City Council.
III. ADDENDA TO THE CONTRACT DOCUMENTS
The City may issue Addenda to the Contract Documents during the period of advertising for any reason. The Bidder shall acknowledge the receipt of the Addenda in their Bid. Failure of the Bidder to do so may result in the rejection of the Bid as non-responsive.
Addenda will be posted on the City website, but it shall be the bidder’s responsibility to inquire for any addenda/updates to this Notice Inviting Bid prior to submitting their bid.
IV. PREPARATION OF THE BID
Reg CC Mtg, June 20, 2023, Page #85
B-4
1. Examination of Site, Plans and Specifications
Prior to submitting a Bid, the Bidder shall examine the Plans and the Work site, carefully read the Specifications, and satisfy itself that it has the abilities and resources to complete the Work. The Bidder agrees that if it is awarded the Contract, no claim will be made against the City based on ignorance or misunderstanding of the provisions of the Contract Documents, the nature and amount of the work, and the physical and climatic conditions of the work site.
The Contractor shall have included in the contract price a sufficient sum to cover all items, including labor, materials, tools, equipment and incidentals, that are implied or required for the complete improvements as contemplated by the drawings, specifications, and other contract documents.
2. Estimated Quantities
The quantities shown in the Bid are approximate only. The Contractor will be paid for the actual quantities of work based on field measurements as provided for in these Specifications. The City reserves the right to increase or decrease the amount of any item or portion of work to be performed or materials furnished, or to delete any item, in accordance with the Specifications.
3. Bid Instructions and Submissions
The Bid shall be submitted on the Bid Proposal forms included with the Specifications. All Bid Documents must be completed, executed and submitted with the Bid by the Bidder.
Required seven (7) Bid Proposal Documents:
1) Bidder's Proposal
2) Contractor's Affidavit
3) Bid Bond (10%)
4) List of Subcontractors
5) Construction Project References
6) Violations of Federal or State Law
7) Disqualification or Debarment
All prices submitted will be considered as including any and all sales or use taxes. The Bid Proposal must be completed in ink or in typewritten form.
The bid sum and all bid amounts on the form must be stated in words and numerals; in case of a conflict, words will take precedence.
Reg CC Mtg, June 20, 2023, Page #86
B-5
In the case of discrepancy between unit bid price and total bid, the unit price shall prevail.
V. BID BOND
Each bid shall be accompanied by Bidder's Security in an amount equal to ten (10) percent of the bid amount, which security shall be lawful money of the United States of America and in one of the following forms: (i) cashier's check made payable to the City of Lomita, (ii) certified check made payable to the City of Lomita, or (iii bid bond executed by an admitted surety insurer and made payable to the City of Lomita. City Bid Bond form must be used.
VI. NON-RESPONSIVE BIDS AND BID REJECTION
1. A Bid in which any one (1) of the required seven (7) Bid proposal documents are not completed, executed and submitted may be considered nonresponsive and be rejected.
2. A Bid in which the Contract Unit Prices are unbalanced, which is incomplete or which shows alteration of form or irregularities of any kind, or which contains any additions or conditional or alternate Bids that are not called for, may be considered non-responsive and be rejected.
VII. AWARD OF CONTRACT
In accordance with the Lomita Municipal Code, the City Council reserves the right to reject any and all bids received, to take all bids under advisement for a period not-to-exceed ninety (90) days after date of opening thereof, to waive any informality or irregularity in the Bid, and to be the sole judge of the merits of material included in the respective bids received.
VIII. EXECUTION OF CONTRACT
After the Contract is awarded, the awardee shall execute the following eight (8) documents:
1) Contract - Public Works Agreement
2) Construction or Service Contract Endorsement
3) Performance Bond (100% of Bid price)
4) Labor and Material Bond (100% of Bid price)
5) Workers' Compensation Insurance Certificate
6) Verification of Insurance Coverage (Certificates and Endorsements) 7) Construction Permit Application Form
8) Business License Application Form
Reg CC Mtg, June 20, 2023, Page #87
B-6
IX. APPRENTICESHIP EMPLOYMENT STANDARDS
The Contractor is directed to the provisions in Sections 1776, 1777.5 and 1777.6 of the California Labor Code concerning the employment of apprentices by the contractor or any subcontractor under them.
X. PERMITS, LICENSES AND PUBLIC WORKS AGREEMENT
The Contractor shall procure and execute all permits, licenses, pay all charges and fees, and give all notices necessary and incidental to the completion of the Work. The Contractor shall execute a Public Works Agreement. A no fee Excavation Permit will be issued by the City of Lomita for this project. The Contractor shall obtain a City of Lomita Business License.
XI. INSURANCE
The Contractor shall maintain Automobile Liability, General Liability and Workers' Compensation Insurance as specified in the Public Works Agreement included in the Project Specifications.
XII. PRE-BID INQUIRIES
A Bidder with a Pre-Bid Inquiry must e-mail their question(s) on or before 1:00 PM on day, Month date, 2023, to the Project Manager, via email at [email protected]. Questions received after this date may not be considered.
XIII. LABOR CODE – SB 854
The bidder shall be registered with the Department of Industrial Relations (DIR) in accordance with the provisions of Section 1771.1 of the California Labor Code, as amended by SB 854. No public work contract may be awarded to a non-registered contractor or subcontractor after April 15, 2015.
XIV. PREVAILING WAGE
Pursuant to Section 1773 of the Labor Code, the general prevailing wage rates in the county, or counties, in which the work is to be done have been determined by the Director of the California Department of Industrial Relations. These wages are set forth in the General Prevailing Wage Rates for this project, available from the California Department of Industrial Relations’ Internet web site at http://www.dir.ca.gov/DLSR/PWD
XV. GUIDELINES DURING COVID-19 PANDEMIC
Contractors shall comply with all local, state and federal laws and regulations Reg CC Mtg, June 20, 2023, Page #88
B-7
including, but not limited to, the Governor’s and Los Angeles County Health Officer’s orders and guidance related to COVID-19, social distancing, and best practices.
Contractors are required to check with the latest guidelines of the Los Angeles County Public Works and the Los Angeles County Public Health for construction sites during the Coronavirus/COVID-19 pandemic.
Reg CC Mtg, June 20, 2023, Page #89
C-1
SECTION C
BID DOCUMENTS
(TO BE SUBMITTED WITH BID PACKAGE)
Reg CC Mtg, June 20, 2023, Page #90
C-2
BIDDER’S PROPOSAL
STANDBY POWER GENERATOR AT APPIAN WAY
Company: _____________________________________________________ Honorable Mayor and Members
of the Lomita City Council
Lomita, California
In accordance with the Notice Inviting Bids pertaining to the receiving of sealed proposals by the City Clerk of the City of Lomita for the above titled improvement, the undersigned hereby proposes to furnish all Work to be performed in accordance with the Plans, Specifications, Standard Drawings, and the Contract Documents, for the unit price or lump sum set forth in the following schedule.
The undersigned hereby acknowledges that he/she has examined the copies of the plans, specifications and all Contract Documents for this project and is fully aware of scope of the work.
The undersigned also acknowledges that he/she has examined the project site and locality where the work is to be performed and the legal requirements and conditions affecting the cost, progress and performance of the work in strict accordance with the Contract Documents.
The undersigned also acknowledges that timely completion of the project is important to the City. Therefore time being of the essence, he/she proposes that the work will be commenced and will be completed within the time specified in the Notice Inviting Bids.
Specification or Items not indicated on Bid Form: The Contractor is to accommodate those portions of the work required by the specifications or contract documents, whose method of payment is not included in other bid items elsewhere.
In addition, bid items costs associated with bonds, insurance, traffic control, labor, equipment, materials, overhead, profits, any and all other indirect costs shall be considered full compensation for each bid item.
All work shall be completed within 30 working days from the date the notice to proceed is issued by the Engineer.
Reg CC Mtg, June 20, 2023, Page #91
C-3
PROJECT BID SCHEDULE
Item
No. Item Description Qty. Unit Unit Price Total Bid
1 General Requirements 1 EA $ $
2 Core Drill Penetration Holes at
Exterior Wall 1 EA $ $
3 Install Generator Connect Cabinet
including Quick Connect 1 EA $ $
4 Install New Circuit Breaker in Existing
Main Switchboard 1 EA $ $
5 Install Kirk-Key Interlock 1 EA $ $
6 Install Conduits and Wiring including
20’ and 100’ Camlock Extension
Wires
1 EA $ $
7 Lighting 1 EA $ $
8 Install GFI Receptacle for Battery
Charger 1 EA $ $
9 Support Testing of Rental Generator 1 EA $ $
10 Support Testing of Permanenl
Generator 1 EA $ $
TOTAL BID (Items 1 through 10) $
TOTAL BID:
(Figures)
(Words)
*BID MAY BE REJECTED IF TOTAL IS NOT SHOWN IN FIGURES AND WORDS.
The undersigned furthermore agrees to enter into and execute a contract, with necessary bonds, at the unit prices set forth herein and in case of default in executing Reg CC Mtg, June 20, 2023, Page #92
C-4
such contract, with necessary bonds, the check or bond accompanying this bid and the money payable thereon shall be forfeited thereby to and remain the property of the City of Lomita.
The above unit prices include all work appurtenant to the various items as outlined in the Specifications and all work or expense required for the satisfactory completion of said items. In case of discrepancies between unit prices and totals, the unit prices shall govern.
The undersigned declares that it has carefully examined the Plans, Specifications, and Contract Documents, and has investigated the site of the work and is familiar with the conditions thereon.
Contractor ______________________________
Date: _______________________ By:
Contractor’s State License No.: ___________Class______ Exp. Date:
Contractor’s Address: _________________________________________________ Phone: _______________________
Reg CC Mtg, June 20, 2023, Page #93
C-5
CONTRACTOR'S AFFIDAVIT
STATE OF CALIFORNIA }
}
COUNTY OF _____________ }
___________________________________________________, being first duly sworn, deposes and says:
1. That he is the ____________________________________________________ Title
of
(Name of Partnership, Corporation, or Sole Proprietorship) hereinafter called "Contractor," who has submitted to the City of Lomita a proposal for:
STANDBY POWER GENERATOR AT APPIAN WAY
2. That said proposal is genuine; that the same is not sham; that all statement of facts therein are true;
3. That such proposal was not made in the interest or behalf of any person, partnership, company, association, organization or corporation not named or disclosed;
4. That the Contractor did not, directly or indirectly, induce, solicit or agree with anyone else to submit a false or sham bid, to refrain from bidding, or to withdraw the bid, to raise or fix the bid price of the Contractor or anyone else, or to raise or fix any overhead, profit or cost element of the Contractor's price or the price of anyone else; and did not attempt to induce action prejudicial to the interest of the City of Lomita, or of any other bidder, or anyone else interested in the proposed contract;
5. That the Contractor has not in any manner sought by collusion to secure for itself an advantage over any other bidder or to induce action prejudicial to the interests of the City of Lomita, or of any other bidder or of anyone else interested in the proposed contract;
6. That the Contractor has not accepted any bid from any subcontractor or materialman through any bid depository, the bylaws, rules or regulations of which prohibit or prevent the Contractor from considering any bid from any subcontractor or materialman, which is not processed through said bid depository, or which prevent any subcontractor or materialman from bidding to any contractor who does not use the facilities of or accept bids from or through such bid depository;
Reg CC Mtg, June 20, 2023, Page #94
C-6
7. That the Contractor did not, directly or indirectly, submit the Contractor's bid price or any breakdown thereof, or the contents thereof, or divulge information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof, or to any individual or group of Individuals, except to the City of Lomita, or to any person or persons who have a partnership or other financial interest with said Contractor in its business.
Dated this _________ day of __________________________, 2023 Subscribed and Sworn to ________________________
Contractor
________________________
Title
before me this _________ day of _____________________, 2023. _________________________________
Notary Public in and for said
County and State.
(Seal)
Reg CC Mtg, June 20, 2023, Page #95
C-7
BID BOND (10%)
KNOW ALL MEN BY THESE PRESENTS: That we,
_________________________________
as principal, and
as sureties, are held and firmly bound unto the City of Lomita, State of California, in the penal sum of ________________________ dollars ($______________), for the payment whereof we hereby bind ourselves, our successors, heirs, executors or administrators jointly and severally, firmly by these presents.
The condition of this obligation is such that, whereas the above bounded principal is about to file with and submit to the City of Lomita a bid or proposal for the performance of certain work as required in the City of Lomita, said work being: STANDBY POWER GENERATOR AT APPIAN WAY in compliance with the Specifications therefor under an invitation of said City contained in a notice or advertisement for bids or proposals; now if the bid or proposal of the said principal shall be accepted and if the said work be thereupon awarded to the principal by said City and if the said principal shall enter into a contract with the said City in accordance with said bid or proposal, or if the bid or proposal of the said principal is rejected, then this bond shall be void and of no effect and otherwise in full force and effect.
WITNESS our hands this ______ day of _______________, 20___. ______________________________
Principal
______________________________
Surety/Attorney-in-Fact
______________________________
Signature
Name:
Local Address:
Phone No.:
Fax No.:
Reg CC Mtg, June 20, 2023, Page #96
C-8
LIST OF SUBCONTRACTORS
STANDBY POWER GENERATOR AT APPIAN WAY
The Bidder is required to fill in the following blanks in accordance with the provisions of the Subletting and Subcontracting Fair Practices Act (Chapter 2 of Division 5, Title 1 of the Government Code of the State of California) and should familiarize itself with Section 2-3 of the Standard Specifications.
Name Under Which Subcontractor is Licensed:________________________________
License Number: ___________
Address of Office, Mill or Shop: ____________________________________________ Specific Description of Sub-Contract:________________________________________
Name Under Which Subcontractor is Licensed:________________________________
License Number: ___________
Address of Office, Mill or Shop: ____________________________________________ Specific Description of Sub-Contract:________________________________________
Name Under Which Subcontractor is Licensed: ________________________________
License Number: ___________
Address of Office, Mill or Shop: ____________________________________________ Specific Description of Sub-Contract:________________________________________
Name Under Which Subcontractor is Licensed:________________________________
License Number: ___________
Address of Office, Mill or Shop: ____________________________________________ Specific Description of Sub-Contract: ________________________________________
Subcontractors listed in accordance with the provisions of Section 2-3 must be properly licensed under the laws of the State of California for the type of work which they are to perform. Do not list alternate subcontractors for the same work.
Reg CC Mtg, June 20, 2023, Page #97
C-9
CONSTRUCTION PROJECT REFERENCE
(Work similar in magnitude and degree of difficulty completed by Contractor within the past three [3] years.)
1. Name (Firm/Agency): _____________________________________________ Address: ________________________________________________________ Contact Person: Telephone No.: __________________
Title of Project: ___________________________________________________ Project Location: __________________________________________________ Date of Completion: Contract Amount: $ ____________
2. Name (Firm/Agency): _____________________________________________ Address: ________________________________________________________ Contact Person: Telephone No.: __________________
Title of Project: ___________________________________________________ Project Location: __________________________________________________ Date of Completion: Contract Amount: $ ____________
3. Name (Firm/Agency): _____________________________________________ Address: ________________________________________________________ Contact Person: Telephone No.: __________________
Title of Project: ___________________________________________________ Project Location: __________________________________________________ Date of Completion: Contract Amount: $ ____________
Reg CC Mtg, June 20, 2023, Page #98
C-10
VIOLATIONS OF FEDERAL, STATE OR LOCAL LAWS
1. Has your firm or its officers been assessed any penalties by an agency for noncompliance or violations of Federal, State or Local labor laws and/or business or licensing regulations within the past five (5) years relating to your construction projects?
Yes/No: ____________________Federal/State:____________________ If “yes,” identify and describe, (including agency and status):
Have the penalties been paid? Yes/No:
2. Does your firm or its officers have any ongoing investigations by any public agency regarding violations of the State Labor Code, California Business and Professions Code or State Licensing Laws?
Yes/No: ______ Code/Laws: ____________ Section/Article: _______________ If “yes,” identify and describe, (including agency and status):
Reg CC Mtg, June 20, 2023, Page #99
C-11
DISQUALIFICATION OR DEBARMENT
Has your firm, any officer of your firm, or any employee who has a proprietary interest in your firm ever been disqualified, removed, or otherwise prevented from bidding on, performing work on, or completing a federal, state or local project because of a violation of law or a safety regulation? Yes/No: _______________. If yes, provide the following information (if more than once, use separate sheets):
Date: _______________ Entity:
Location:
Reason:
Provide Status and any Supplemental Statement:
Has your firm been reinstated by this entity? Yes/No:
Reg CC Mtg, June 20, 2023, Page #100
D-1
SECTION D
CONTRACT DOCUMENTS
TO BE SUBMITTED
WITHIN TWENTY ONE (21) CALENDAR DAYS
AFTER AWARD OF CONTRACT
Reg CC Mtg, June 20, 2023, Page #101
D-2
CITY OF LOMITA
PUBLIC WORKS AGREEMENT
CITY OF LOMITA
PUBLIC WORKS AGREEMENT
This Public Works Agreement (“Agreement”) is made and entered into as of the date executed by the City Manager and attested to by the City Clerk, by and between (hereinafter referred to as "CONTRACTOR") and the City of Lomita, California, a municipal corporation (hereinafter referred to as "CITY").
R E C I T A L S
A. Pursuant to the Notice Inviting Sealed Bids for STANDBY POWER GENERATOR AT APPIAN WAY Project, bids were received, publicly opened, and declared on the date specified in the notice.
B. On March 15, 2022, Lomita’s City Council declared CONTRACTOR to be the lowest responsible bidder and accepted the bid of CONTRACTOR.
C. The City Council has authorized the City Manager to execute a written contract with CONTRACTOR for furnishing labor, equipment and material for the STANDBY POWER GENERATOR AT APPIAN WAY Project in the City of Lomita.
NOW, THEREFORE, in consideration of the foregoing and the mutual covenants herein contained, it is agreed:
1. GENERAL SCOPE OF WORK: CITY agrees to engage CONTRACTOR and CONTRACTOR agrees to furnish all necessary labor, tools, materials, appliances, and equipment for and do the work for the STANDBY POWER GENERATOR AT APPIAN WAY Project in the City of Lomita. The work shall be performed in accordance with the Plans and Specifications dated MONTH 2023 (the “Specifications” attached as Exhibit A) and in accordance with bid prices set forth in CONTRACTOR’S Bid Proposal (attached as Exhibit B) and in accordance with the instructions of the City Engineer.
2. INCORPORATED DOCUMENTS TO BE CONSIDERED COMPLEMENTARY:
The contract documents for the aforesaid project, a complete set of which is on file with the Lomita City Clerk’s Office, shall consist of the Notice Inviting Bids, Instructions to Bidders, Bid Proposal, Builders General Provisions, Standard Specifications, Special Provisions, and all referenced specifications, details, standard drawings, and appendices; together with this Agreement and all required bonds, insurance certificates, permits, notices and affidavits; and also, including any and all addenda or supplemental agreements clarifying, amending, Reg CC Mtg, June 20, 2023, Page #102
D-3
or extending the work contemplated as may be required to insure its completion in an acceptable manner. All of the provisions of said contract documents are made a part hereof as though fully set forth herein. This contract is intended to require a complete and finished piece of work and anything necessary to complete the work properly and in accordance with the law and lawful governmental regulations shall be performed by CONTRACTOR whether set out specifically in the contract or not. Should it be ascertained that any inconsistency exists between the aforesaid documents and this written agreement, the provisions of this Agreement, the Builders General Provisions and the Standard Specifications, in that order, shall control. Collectively, these contract documents constitute the complete agreement between CITY and CONTRACTOR and supersede any previous agreements or understandings.
3. COMPENSATION: CONTRACTOR agrees to receive and accept the prices set forth in its Bid Proposal as full compensation for furnishing all materials, performing all work, and fulfilling all obligations hereunder. Said compensation shall cover all expenses, losses, damages, and consequences arising out of the nature of the work during its progress or prior to its acceptance including those for well and faithfully completing the work and the whole thereof in the manner and time specified in the aforesaid contract documents; and also including those arising from actions of the elements, unforeseen difficulties or obstructions encountered in the prosecution of the work, suspension or discontinuance of the work, and all other unknowns or risks of any description connected with the work.
4. TIME OF PERFORMANCE: CONTRACTOR agrees to complete the work within 30 working days from the date of the notice to proceed. By signing this Agreement, CONTRACTOR represents to CITY that the contract time is reasonable for completion of the work and that CONTRACTOR will complete such work within the contract time. In accordance with Government Code Section 53069.85, CONTRACTOR agrees to forfeit and pay CITY as liquidated damages, not as a penalty, the sum of $1000.00 per day for each and every day of unauthorized delay beyond the completion date, which amount shall be deducted from any payments due or to become due the CONTRACTOR.
5. PREVAILING WAGES:
Pursuant to Labor Code § 1720, and as specified in 8 California Code of Regulations § 16000, CONTRACTOR must pay its workers prevailing wages. It is CONTRACTOR’s responsibility to interpret and implement any prevailing wage requirements and CONTRACTOR agrees to pay any penalty or civil damages resulting from a violation of the prevailing wage laws.
In accordance with Labor Code § 1773.2, copies of the prevailing rate of per diem wages are available upon request from CITY’s Engineering Division or the website for State of California Prevailing wage determination at http://www.dir.ca.gov/DLSR/PWD. CONTRACTOR must post a copy of the prevailing rate of per diem wages at the job site.
CITY directs CONTRACTOR’s attention to Labor Code §§ 1777.5, 1777.6 and 3098 concerning the employment of apprentices by CONTRACTOR or any subcontractor.
Reg CC Mtg, June 20, 2023, Page #103
D-4
Labor Code § 1777.5 requires CONTRACTOR or subcontractor employing tradesmen in any apprenticeship occupation to apply to the joint apprenticeship committee nearest the site of the public works project and which administers the apprenticeship program in that trade for a certificate of approval. The certificate must also fix the ratio of apprentices to journeymen that will be used in the performance of the contract. The ratio of apprentices to journeymen in such cases will not be less than one to five except:
When employment in the area of coverage by the joint apprenticeship committee has exceeded an average of 15 percent in the 90 days before the request for certificate, or
When the number of apprentices in training in the area exceeds a ratio of one to five, or
When the trade can show that it is replacing at least 1/30 of its membership through apprenticeship training on an annual basis state-wide or locally, or When CONTRACTOR provides evidence that CONTRACTOR employs registered apprentices on all of his contracts on an annual average of not less than one apprentice to eight journeymen.
CONTRACTOR is required to make contributions to funds established for the administration of apprenticeship programs if CONTRACTOR employs registered apprentices or journeymen in any apprenticeable trade on such contracts and if other contractors on the public works site are making such contributions.
CONTRACTOR and any subcontractor must comply with Labor Code §§ 1777.5 and 1777.6 in the employment of apprentices.
Information relative to apprenticeship standards, wage schedules and other requirements may be obtained from the Director of Industrial Relations, ex-officio the Administrator of Apprenticeship, San Francisco, California, or from the Division of Apprenticeship Standards and its branch offices.
CONTRACTOR and its subcontractors must keep an accurate certified payroll records showing the name, occupation, and the actual per diem wages paid to each worker employed in connection with this Agreement. The record will be kept open at all reasonable hours to the inspection of the body awarding the contract and to the Division of Labor Law Enforcement. If requested by CITY, CONTRACTOR must provide copies of the records at its cost.
6. LEGAL HOURS OF WORK: Eight (8) hours of labor shall constitute a legal day's work for all workmen employed in the execution of this contract, and CONTRACTOR and any subcontractor under it shall comply with and be governed by the laws of the State of California having to do with working hours Reg CC Mtg, June 20, 2023, Page #104
D-5
set forth in Division 2, Part 7, Chapter 1, Article 3 of the Labor Code of the State of California as amended.
CONTRACTOR shall forfeit, as a penalty to CITY, twenty-five dollars ($25.00) for each laborer, workman or mechanic employed in the execution of the contract, by him or any subcontractor under it, upon any of the work hereinbefore mentioned, for each calendar day during which the laborer, worker or mechanic is required or permitted to labor more than eight (8) hours in violation of the Labor Code.
7. TRAVEL AND SUBSISTENCE PAY: CONTRACTOR agrees to pay travel and subsistence pay to each worker needed to execute the work required by this Agreement as such travel and subsistence payments are defined in the applicable collective bargaining agreements filed in accordance with Labor Code Section 1773.8.
8. CONTRACTOR'S LIABILITY: The City of Lomita and its officers, agents and employees ("Indemnitees") shall not be answerable or accountable in any manner for any loss or damage that may happen to the work or any part thereof, or for any of the materials or other things used or employed in performing the work; or for injury or damage to any person or persons, either workers or employees of CONTRACTOR, of its subcontractors or the public, or for damage to adjoining or other property from any cause whatsoever arising out of or in connection with the performance of the work. CONTRACTOR shall be responsible for any damage or injury to any person or property resulting from defects or obstructions or from any cause whatsoever.
CONTRACTOR will indemnify Indemnitees against and will hold and save Indemnitees harmless from any and all actions, claims, damages to persons or property, penalties, obligations or liabilities that may be asserted or claimed by any person, firm, entity, corporation, political subdivision, or other organization arising out of or in connection with the work, operation, or activities of CONTRACTOR, its agents, employees, subcontractors or invitees provided for herein, whether or not there is concurrent passive negligence on the part of any Indemnitee. In connection therewith:
a. CONTRACTOR will defend any action or actions filed in connection with any such claims, damages, penalties, obligations or liabilities and will pay all costs and expenses, including attorneys' fees, expert fees and costs incurred in connection therewith.
b. CONTRACTOR will promptly pay any judgment rendered against CONTRACTOR or Indemnitees covering such claims, damages, penalties, obligations and liabilities arising out of or in connection with such work, operations or activities of CONTRACTOR hereunder, and CONTRACTOR agrees to save and hold the Indemnitees harmless therefrom.
c. In the event Indemnitees are made a party to any action or proceeding filed or prosecuted against CONTRACTOR for damages or other claims arising out of or in connection with the work, operation or activities hereunder, CONTRACTOR agrees to pay to Indemnitees and any all costs and expenses incurred by Indemnitees in such action or proceeding together with reasonable attorneys' fees.
Reg CC Mtg, June 20, 2023, Page #105
D-6
CONTRACTOR'S obligations under this section apply regardless of whether or not such claim, charge, damage, demand, action, proceeding, loss, stop notice, cost, expense, judgment, civil fine or penalty, or liability was caused in part or contributed to by an Indemnitee. However, without affecting the rights of CITY under any provision of this agreement, Contractor shall not be required to indemnify and hold harmless CITY for liability attributable to the active negligence of CITY, provided such active negligence is determined by agreement between the parties or by the findings of a court of competent jurisdiction. In instances where CITY is shown to have been actively negligent and where CITY active negligence accounts for only a percentage of the liability involved, the obligation of Contractor will be for that entire portion or percentage of liability not attributable to the active negligence of City.
So much of the money due to CONTRACTOR under and by virtue of the contract as shall be considered necessary by CITY may be retained by CITY until disposition has been made of such actions or claims for damages as aforesaid.
It is expressly understood and agreed that the foregoing provisions are intended to be as broad and inclusive as is permitted by the law of the State of California.
This indemnity provision shall survive the termination of the Agreement and is in addition to any other rights or remedies which Indemnitees may have under the law.
This indemnity is effective without reference to the existence or applicability of any insurance coverage which may have been required under this Agreement or any additional insured endorsements which may extend to Indemnitees.
CONTRACTOR, on behalf of itself and all parties claiming under or through it, hereby waives all rights of subrogation and contribution against the Indemnitees, while acting within the scope of their duties, from all claims, losses and liabilities arising our of or incident to activities or operations performed by or on behalf of the CONTRACTOR regardless of any prior, concurrent, or subsequent passive negligence by the Indemnitees.
9. THIRD PARTY CLAIMS. In accordance with Public Contracts Code § 9201, CITY will promptly inform CONTRACTOR regarding third-party claims against CONTRACTOR, but in no event later than ten (10) business days after CITY receives such claims. Such notification will be in writing and forwarded in accordance with the “Notice” section of this Agreement. As more specifically detailed in the contract documents, CONTRACTOR agrees to indemnify and defend the City against any third-party claim.
10. WORKERS COMPENSATION: In accordance with California Labor Code Sections 1860 and 3700, CONTRACTOR and each of its subcontractors will be required to secure the payment of compensation to its employees. In accordance with the provisions of California Labor Code Section 1861, CONTRACTOR, by signing this contract, certifies as follows: "I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for worker's compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract.
Reg CC Mtg, June 20, 2023, Page #106
D-7
11. INSURANCE: With respect to performance of work under this contract, CONTRACTOR shall maintain and shall require all of its subcontractors to maintain insurance as required in the Builders General Provisions.
12. ASSIGNMENT: This Agreement is not assignable nor the performance of neither party's duties delegable without the prior written consent of the other party. Any attempted or purported assignment or delegation of any of the rights of obligations of either party without the prior written consent of the other shall be void and of no force and effect.
13. INDEPENDENT CONTRACTOR: CONTRACTOR is and shall at all times remain as to the CITY, a wholly independent contractor. Neither the CITY nor any of its agents shall have control of the conduct of CONTRACTOR or any of CONTRACTOR'S employees, except as herein set forth. CONTRACTOR shall not at any time or in any manner represent that it or any of its agents or employees are in any manner agents or employees of CITY.
14. TAXES: CONTRACTOR is responsible for paying all retail sales and use, transportation, export, import, special or other taxes and duties applicable to, and assessable against any work, materials, equipment, services, processes and operations incidental to or involved in this contract. CONTRACTOR is responsible for ascertaining and arranging to pay them. The prices established in the contract shall include compensation for any taxes CONTRACTOR is required to pay by laws and regulations in effect at the bid opening date.
15. LICENSES: CONTRACTOR represents and warrants to CITY that it has all licenses, permits, qualifications, insurance, and approvals of whatsoever nature which are legally required of CONTRACTOR to practice its profession.
CONTRACTOR represents and warrants to CITY that CONTRACTOR shall, at its sole cost and expense, keep in effect or obtain at all times during the term of this Agreement any licenses, permits, insurance, and approvals which are legally required of CONTRACTOR to practice its profession. CONTRACTOR shall maintain a City of Lomita business license, if required under CITY ordinance.
16. RECORDS: CONTRACTOR shall maintain accounts and records, including personnel, property, and financial records, adequate to identify and account for all costs pertaining to this Agreement and such other records as may be deemed necessary by CITY or any authorized representative, and will be retained for three years after the expiration of this Agreement. All such records shall be made available for inspection or audit by CITY at any time during regular business hours.
17. SEVERABILITY. If any portion of these contract documents are declared by a court of competent jurisdiction to be invalid or unenforceable, then such portion will be deemed modified to the extent necessary in the opinion of the court to render such portion enforceable and, as so modified, such portion and the balance of this Agreement will continue in full force and effect provided that it does not frustrate the mutual intent of the parties herein.
18. WHOLE AGREEMENT: This Agreement supersedes any and all other agreements either oral or written, between the parties and contains all of the Reg CC Mtg, June 20, 2023, Page #107
D-8
covenants and agreements between the parties pertaining to the work of improvements described herein. Each party to this Agreement acknowledges that no representations, inducements, promises, or agreements, orally or otherwise, have been made by any party, or anyone acting on behalf of any party, which are not embodied herein, and that any other agreement, statements, or promise not contained in this Agreement shall not be valid or binding. Any modification of this Agreement will be effective only if signed by the party to be charged.
19. AUTHORITY: CONTRACTOR affirms that the signatures, titles, and seals set forth hereinafter in execution of this Agreement represent all individuals, firm members, partners, joint ventures, and/or corporate officers having a principal interest herein. Each party warrants that the individuals who have signed this Agreement have the legal power, right, and authority to make this Agreement and to bind each respective party. This Agreement may be modified by written amendment. CITY’s City Manager may execute any such amendment on CITY’s behalf.
20. NOTICES: All notices permitted or required under this Agreement shall be in writing and shall be deemed made when delivered to the applicable party’s representative as provided in this Agreement. Additionally, such notices may be given to the respective parties at the following addresses, or at such other addresses as the parties may provide in writing for this purpose.
Such notices shall be deemed made when personally delivered or when mailed forty-eight (48) hours after deposit in the U.S. mail, first-class postage prepaid, and addressed to the party at its applicable address. Courtesy copies of notices may be sent via electronic mail, provided that the original notice is deposited in the U.S. mail or personally delivered as specified in this Section.
21. DISPUTES. Disputes arising from this Agreement will be determined in accordance with the contract documents and Public Contracts Code §§ 10240- 10240.13.
22. NON-DISCRIMINATION: No discrimination shall be made in the employment of persons in the work contemplated by this Agreement because of race, religion, color, medical condition, sex, sexual orientation, national origin, political affiliation or opinion, or pregnancy or pregnancy-related condition. A violation of this
CITY OF LOMITA, CA
24300 Narbonne Avenue, Lomita, CA 90717
Attention:
CONTRACTOR:
______________________
________________________________
Attention:
Reg CC Mtg, June 20, 2023, Page #108
D-9
section exposes CONTRACTOR to the penalties provided for in Labor Code Section 1735.
23. NO THIRD PARTY BENEFICIARY. This Agreement and every provision herein is for the exclusive benefit of the Contractor and the City and not for the benefit of any other party. There will be no incidental or other beneficiaries of any of the Contractor’s or the City’s obligations under this Contract.
24. TIME IS OF ESSENCE. Time is of the essence for each and every provision of the Contract Documents.
25. ACCEPTANCE OF FACSIMILE OR ELECTRONIC SIGNATURES. The Parties agree that this Agreement will be considered signed when the signature of a party is delivered by facsimile transmission, scanned and delivered via electronic mail, or delivered using digital signature technology approved by CITY. Such facsimile or electronic signatures will be treated in all respects as having the same effect as an original signature.
26. GOVERNING LAW: This Agreement shall be governed by the laws of the State of California, and exclusive venue for any action involving this Agreement will be in Los Angeles County.
Reg CC Mtg, June 20, 2023, Page #109
D-10
IN WITNESS WHEREOF, the parties hereto have executed this Agreement with all the formalities required by law on the respective dates set forth opposite their signatures.
State of California
CONTRACTOR’S License No.
CONTRACTOR
By:
DATE
CONTRACTOR’S Business Phone
Emergency Phone at which CONTRACTOR can be reached at any time:
CITY OF LOMITA, CALIFORNIA
By:
DATE Ryan Smoot, CITY MANAGER
ATTEST:
By:
DATE Kathleen Horn Gregory, CITY CLERK
APPROVED AS TO FORM:
By:
DATE Trevor Rusin, CITY ATTORNEY
Attachments: Exhibit A: Contractor’s Bid Proposal
Reg CC Mtg, June 20, 2023, Page #110
D-11
CITY OF LOMITA
CONSTRUCTION OR SERVICE CONTRACT ENDORSEMENT
To be attached to and made a part of all policies insuring the liability of any person, form or corporation performing services under contract for the City of Lomita.
Not withstanding any inconsistent expression in the policy to which this endorsement is attached, or in any other endorsement now or hereafter attached thereto, or made a part thereof, the protection afforded by said policy shall:
1. Include the City of Lomita as an additional insured. (To include the elected officials, appointed officials, and employees.)
2. Indemnify and save harmless the City of Lomita against any and all claims resulting from the undertaking specified in the contract known as:
PROPOSAL, SPECIFICATIONS, BOND AND AFFIDAVIT
FOR
STANDBY POWER GENERATOR AT APPIAN WAY
This hold harmless assumption on the part of the underwriters shall include all costs of investigation and defense, including claims based on damage to substructures not shown, not located on the plans, or shown incorrectly.
3. Not be cancelled except by notice to the City Attorney of the City of Lomita at least thirty (30) days prior to the date of cancellation.
4. Provide single limit for Bodily Injury Liability and Property Damage Liability combined, $3,000,000 each Occurrence, and $5,000,000 Aggregate.
5. Limited classifications, restricting endorsements, exclusions or other special provisions contained in the policy shall not act to limit the benefits of coverage as they shall apply to the City of Lomita as enumerated in this endorsement.
However, nothing herein contained shall affect any rights of the insurer against the insured.
6. It is further expressly agreed by and between the parties hereto that the following two provisions, (a) and (b), are a part of this contract:
(a) That the CONTRACTOR specifically agrees to comply with applicable provisions of Section 1777.5 of the Labor Code relating to the employment by contractor or subcontractor under it, of journeyman or apprentices, or workmen, in any apprenticeable craft or trade.
(b) By my signature hereunder, as CONTRACTOR, I certify that I am aware of the provisions of Section 3700 of the Labor Code which requires every employer to be insured against liability for Workers’ Compensation or to undertake self-insurance in accordance with the provisions of that code, Reg CC Mtg, June 20, 2023, Page #111
D-12
and I will comply with such provisions before commencing the performance of the work of this contract.
The limits of liability as stated in this endorsement apply to the insurance afforded by this endorsement notwithstanding that the policy may have lower limits of liability applying elsewhere in the policy.
______________________________
Duly Authorized Agent
Attached to and forming part of
Policy No.: _______________
of the: ___________________
Date: ____________________
Expiration Date: ___________
Reg CC Mtg, June 20, 2023, Page #112
D-13
PERFORMANCE BOND
KNOW ALL MEN BY THESE PRESENTS:
That we, as Principal(s) and
a corporation, incorporated, organized, and existing under the laws of the State of _____________, and authorized to execute bonds and undertakings and to do a general surety business in the State of California, as Surety, are jointly and severally held and firmly bound unto the City of Lomita, a municipal corporation, located in the County of Los Angeles, State of California, in the full and just sum of:
______________________________________________________________ Dollars ($__________________), lawful money of the United States of America, for the payment of which sum, well and truly to be made, we bind ourselves and our respective heirs, executors, administrators, representative, successors and assigns, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH, that: WHEREAS, said Principal(s) have/has entered into, or are/is about to enter into, a certain written contract or agreement, dated as of the ______ day of ____________, 20____, with the said City of Lomita for the STANDBY POWER GENERATOR AT APPIAN WAY, all as is more specifically set forth in said contract or agreement, a full, true and correct copy of which is hereunto attached, and hereby referred to and by this reference incorporated herein and made a part hereof;
NOW, THEREFORE, if the said Principal(s) shall faithfully and well and truly do, perform and complete, or cause to be done, performed and complete, each and all of the covenants, terms, conditions, requirements, obligations, acts and things, to be met, done or performed by said Principal(s), including any guarantee period as set forth in, or required by, said contract or agreement, all at and within the time or times, and in the manner as therein specified and contemplated, then this bond and obligation shall be null and void; otherwise it shall be and remain in full force, virtue and effect.
The said Surety, for value received, hereby stipulates and agrees that no amendment, change, extension of time, alteration or addition to said contract or agreement, or of any feature or item or items of performance required therein or thereunder, shall in any manner affect its obligations on or under this bond; and said Surety does hereby waive notice of any such amendment, change, extension of time, alteration, or addition to said contract or agreement, and of any feature or item or items of performance required therein or thereunder.
Reg CC Mtg, June 20, 2023, Page #113
D-14
PERFORMANCE BOND (CONTINUED)
In the event any suit, action or proceedings is instituted to recover on this bond or obligation, said Surety will pay, and does hereby agree to pay, as attorney's fees for said City, such sum as the Court in any such suit, action or proceeding may adjudge reasonable.
EXECUTED, SEALED AND DATED this _________ day of _____________, 20____.
CORPORATE SEAL PRINCIPAL(S):
BY _____________________________
BY _____________________________
CORPORATE SEAL SURETY:
BY _____________________________
Reg CC Mtg, June 20, 2023, Page #114
D-15
LABOR AND MATERIAL BOND
KNOW ALL MEN BY THESE PRESENTS:
That we, ________________________________________________ as Principal(s) and ____________________________________________ a corporation, incorporated, organized, and existing under the laws of the State of ______________, and authorized to execute bonds and undertakings and to do a general surety business in the State of California, as Surety, are jointly and severally held and firmly bound unto:
(a) The State of California for the use and benefit of the State Treasurer, as exofficio Treasurer and custodian of the Unemployment Fund of said State; and (b) The City of Lomita, California; and
(c) Any and all persons who do or perform or who did or performed work or labor upon or in connection with the work or improvement referred to in the contract or agreement hereinafter mentioned; and
(d) Any and all materialmen, persons, companies, firms, association, or corporations, supplying or furnishing any materials, provisions, provender, transportation, appliances or power, or other supplies used in, upon, for or about or in connection with the performance of the work or improvement contracted to be executed, done, made or performed under said contract or agreement; and (e) Any and all persons, companies, firms, associations, or corporations furnishing, renting, or hiring teams, equipment, implements or machinery for, in connection with, or contributing to, said work to be done or improvement to be made under said contract or agreement; and
(f) Any and all persons, companies, firms, associations, or corporations who supply both work and materials;
and whose claim has not been paid by said Principal(s), in full and just sum of ______________________________________________________________ Dollars ($___________________), lawful money of the United States of America, for the payment of which will and truly to be made, said Principal(s) and said Surety do hereby bind themselves and their respective heirs, executors, administrators, representatives, successors and assigns, jointly and severally, firmly by these presents.
Reg CC Mtg, June 20, 2023, Page #115
D-16
LABOR AND MATERIAL BOND (CONTINUED)
THE CONDITION OF THE FOREGOING OBLIGATION IS SUCH, THAT: WHEREAS, said Principal(s) have/has entered into or are/is about to enter into a certain written contract or agreement, dated as of the _______ day of __________________20 ___, with the City of Lomita for the STANDBY POWER GENERATOR AT APPIAN WAY, all as is more specifically set forth in said contract or agreement, a full, true and correct copy of which is hereunto attached, and hereby referred to and by this reference incorporated herein and made a part hereof;
NOW, THEREFORE, if the said Principal(s) (or any of his/her, its, or their subcontractors) under said contract or agreement fails or fail to pay:
(1) For any materials, provisions, provender, transportation, appliances, or power, or other supplies; or
(2) For the hire of any teams, equipment, implements, or machinery; or (3) For any work or labor; supplies, furnished, provided, used, done or performed in, upon, for or about or in connection with the said work or improvement; or (4) For amounts due under the Unemployment Insurance Act of the State of California with respect to such work or improvement;
the Surety on this bond will pay the same in an amount not exceeding the sum hereinabove specified in this bond; and, also, in case suit is brought upon this bond, said Surety will (and does hereby agree to) pay a reasonable attorney's fee, to be fixed and taxed as costs, and included in the judgment therein rendered.
This bond shall (and it is hereby made to) insure to the benefit of any and all persons entitled to file claims under Section 1192.1 of the Code of Civil Procedure of the State of California, so as to give a right of action to them or their assigns in any suit brought upon this bond, all as contemplated under the provisions of Section 4205 of the Government Code, and of Chapter 1 of Title 4 of Part 3 of the Code of Civil Procedure, of the State of California.
This bond is executed and filed in connection with said contract or agreement hereunto attached to comply with each and all of the provisions of the laws of the State of California above mentioned or referred to, and of all amendments thereto, and the obligors so intend and do hereby bind themselves accordingly.
Reg CC Mtg, June 20, 2023, Page #116
D-17
LABOR AND MATERIAL BOND (CONTINUED)
The said Surety, for value received, hereby stipulates and agrees that no amendment, change, extension of time, alteration, or addition to said contract or agreement, or of any feature or item or items of performance required therein or thereunder, shall in any manner affect its obligations on or under this bond; and said Surety does hereby waive notice of any such amendment, change, extension of time, alteration, or addition to said contract or agreement, and of any feature or item or items of performance required therein or thereunder.
EXECUTED, SEALED AND DATED this ______ day of __________________, 20 ___ CORPORATE SEAL PRINCIPAL:
BY ______________________________
CORPORATE SEAL SURETY:
BY ______________________________
Reg CC Mtg, June 20, 2023, Page #117
D-18
WORKERS' COMPENSATION INSURANCE CERTIFICATION
STANDBY POWER GENERATOR AT APPIAN WAY In compliance with Section 7-4 of the Standard Specifications, the CONTRACTOR shall complete and submit the following certification with a Certificate of Insurance before execution of the contract.
I am aware of, and will comply with, Section 3700 of the Labor Code, requiring every employer to be insured against liability for Workers' Compensation or to undertake selfinsurance before commencing any of the work.
DATED: _______________________
_____________________________
CONTRACTOR
By: _________________________
Signature
Title:_________________________
Reg CC Mtg, June 20, 2023, Page #118
E-1
SECTION E
SPECIAL PROVISIONS
The following Special Provisions supplement and amend the latest editions of the Standard Specifications for Public Works Construction (SSPWC “Greenbook”), and the Standard Specification of the State of California Department of Transportation (Caltrans), as noted herein. These Special Provisions have been arranged in a format that parallels the SSPWC “Greenbook” Standard Specifications.
Reg CC Mtg, June 20, 2023, Page #119
E-2
PART 1 - GENERAL PROVISIONS
SECTION 1 - GENERAL, TERMS, DEFINITIONS, ABBREVIATIONS, UNITS OF MEASURE,
AND SYMBOLS
1-2 TERMS AND DEFINITIONS. Add or redefine the following:
AGENCY – The City of Lomita, herein referred to as City.
BOARD – The City Council of the City of Lomita, herein referred to as City Council.
ENGINEER –The Public Works Director/City Engineer of the City of Lomita, acting either directly or through properly authorized agents, such agents acting within the scope of the particular duties entrusted to them.
CLAIM -- A separate demand by the Contractor for (A) a time extension, (B) payment of money or damages arising from work done by or on behalf of the Contractor pursuant to the Contract and payment of which is not otherwise expressly provided for or the claimant is not otherwise entitled to, or (C) an amount the payment of which is disputed by the Agency. 1-7 AWARD AND EXECUTION OF THE CONTRACT.
1-7.1 General. Replace the entire sub-section with the following:
Within twenty-one (21) calendar days after the date of the City’s award of contract, the Contractor shall execute and return all Contract Documents required by the City. The City reserves the right to terminate the award if the above requirement is not met. Such termination will result in the forfeiture of the Proposal Guaranty.
Per Lomita Municipal Code the City of Lomita reserves the right to reject any and all proposals, to waive any informality or irregularity in such bids, and determine the lowest responsible bidder.
The Contract Agreement shall not be considered binding upon the City until executed by the authorized City officials.
1-7.2 Contract Bonds. Add the following
The "Performance Bond" shall remain in effect for one year following the date specified in the Notice of Completion or, if no Notice of Completion is recorded, for one year following the date of final acceptance of the project by the City Council.
SECTION 2 - SCOPE OF THE WORK
2-1 WORK TO BE DONE. Add the following:
Scope of Work. The Work generally consists of furnishing all labor, materials, tools, equipment, and incidentals necessary to provide standby power generator at the Appian Way Reg CC Mtg, June 20, 2023, Page #120
E-3
Water Pumping Stations as specified in the Specifications and these Special Provisions, and as directed by the Engineer.
The Work also includes all necessary traffic control; preparing and updating construction schedules; and site safety.
2-2 PERMITS. Replace the subsection with the following:
The Contractor shall obtain a Business License and Encroachment Permit before commencing construction.
SECTION 3 – CONTROL OF THE WORK
3-7 CONTRACT DOCUMENTS.
3-7.1 General. Add the following sentence to the first paragraph to read as follows:
The Contractor shall maintain a control set of Plans and Specifications on the Work site at all times. All final locations determined in the field, and any deviations from the Plans and Specifications, shall be marked in red on this control set to show as-built conditions. Upon completion of the Work, the Contractor shall submit the control set to the Engineer for approval. Final payment will not be made until this requirement is met.
Add the following subsections:
3-7.1.1 Plans. Included as part of the Contract Documents are the following, which show the location, character, dimensions or details of the Work:
1) Project Plans
The plans and data provided with the Contract Documents are based on existing plans and documents. The plans and data are provided for information only. The Owner does not guarantee their accuracy and correctness. If the Bidder in preparing the Bid Proposal uses this information, the Bidder assumes all risks resulting from conditions differing from the information shown. The Bidder, in consideration for the information being provided, hereby releases the City, from any responsibility of obligation as to the accuracy of such information or for any additional compensation for work performed due to assumptions based on the use of such information.
2) Standard Plans
a. City of Lomita Standard Plans, latest edition
b. Standard Plans for Public Works Construction, latest edition, promulgated by Public Works Standards, Inc.
c. Standard Plans of the State of California Department of Transportation (Caltrans), latest edition
3-7.1.2 SPECIFICATIONS. The Work shall be performed or executed in accordance with these Provisions and the following:
Reg CC Mtg, June 20, 2023, Page #121
E-4
1) Standard Specifications for Public Works Construction, latest edition and supplements thereto, hereinafter referred to as the Greenbook, as written and promulgated by Public Works Standards, Inc. The Greenbook is published by BNi Building News, Inc., 1612 South Clementine Street, Anaheim, CA 92802, Phone: (800) 873-6397.
2) Sections 56-2, 84, 85, 86 and 90-10 of the State of California Department of Transportation (Caltrans) Standard Specifications, latest edition. 3-7.2 Precedence of the Contract Documents. Replace the entire subsection with the following:
If there is a conflict between any of the Contract Documents, the document highest in precedence shall control. The order of precedence shall be as follows:
1) Permits issued by other agencies.
2) Change Orders (including Plans and Specifications attached thereto). 3) Public Works Agreement
4) Addenda
5) Special and General Provisions
6) Plans
7) City Standard Plans
8) Other Standard Plans
9) Greenbook
10)Reference Specifications
With reference to the Plans/Drawings, the order of precedence is as follows:
1) Change Order plans govern over Addenda and Contract plans 2) Addenda plans govern over Contract plans
3) Contract plans govern over standard plans
4) Detail plans govern over general plans
5) Figures govern over scaled dimensions
Within the Specifications, the order of precedence is as follows:
1) Change Orders
2) Permits from other agencies/Supplemental Agreements
3) Special Provisions
4) Instruction to Bidders
5) Referenced Standard Plans
6) Referenced Standard Specifications
If the Contractor, in the course of the Work, becomes aware of any claimed errors or omissions in the Contract Documents or in the City's fieldwork, the Contractor shall immediately inform the Engineer. The Engineer shall promptly review the matter, and if the Engineer finds an error or omission has been made the Engineer shall determine the corrective actions and advise the Contractor accordingly. If the corrective work associated with an error or omission increases or decreases the amount of work called for in the Contract, the City shall issue an appropriate Change Order in accordance with subsection 2-8.
After discovery of an error or omission by the Contractor, any related work performed by the Contractor shall be done at the Contractor's risk unless authorized by the Engineer.
Reg CC Mtg, June 20, 2023, Page #122
E-5
3-8 SUBMITTALS.
Submittals are required for the following:
• Construction Schedule
• Vendor Submittals (electrical equipment and wiring)
All Contractor submittals shall be carefully reviewed against the contract documents by an authorized representative of the Contractor, prior to submittal to the Engineer. A letter shall be included with each submittal stating the contract documents have been reviewed and the submitted product is correct for the project application and in strict conformance with the contract documents. The letter affidavit must be dated and signed by both the Contractor and the product manufacturer or service provider. In the case of shop drawings, each sheet shall be so dated and signed for approval. No consideration for review by the Engineer of any Contractor submittals will be made for any items which are not accompanied by affidavit by the Contractor. All submittals without an affidavit will be returned to the Contractor without action taken by the Engineer, and any delays caused thereby shall be the total responsibility of the Contractor.
The Engineer's review of Contractor submittals shall not relieve the Contractor of the entire responsibility for the correctness of details and dimensions. The Contractor shall assume all responsibility and risk for any misfits due to any errors in Contractor submittals. The Contractor shall be responsible for the dimensions and the design of adequate connections and details.
3-13 COMPLETION, ACCEPTANCE AND WARRANTY. Add the following:
It is the intent of the Specifications that only first-class materials and workmanship will be acceptable. The Contractor shall take all necessary measures to protect Work from damage and prevent accidents and vandalism during any and all phases of the work.
Until the final acceptance of the Work by the City, by written action of the Engineer, the Contractor shall have the charge and care thereof and will bear the risk of injury or damage to any part of the Work by the action of the elements, vandalism, or any other cause. The Contractor shall rebuild, repair, restore and make good all injuries or damages to any portion of the Work occasioned by any cause before its completion and acceptance and will bear the expense thereof.
If, in the Engineer’s judgment, the Work has been completed and is ready for acceptance, the Engineer will so certify and will determine the date when the Work was completed. This will be the date when the Contractor is relieved from responsibility to protect the Work. The Engineer may cause a Notice of Completion to be filed and recorded with the Los Angeles County Recorder’s Office. At the Engineer’s option, the Engineer may certify acceptance to the City Council who may then cause a Notice of Completion to be filed and recorded with the Los Angeles County Recorder’s Office.
Add the following subsection:
Reg CC Mtg, June 20, 2023, Page #123
E-6
3-13.4 Manufacturer’s Warranties. Manufacturer's warranties shall not relieve the Contractor of liability under these Specifications. Such warranties only shall supplement the Contractor's responsibility.
SECTION 4 - CONTROL OF MATERIALS
4-1 GENERAL- Add the following paragraph after the second paragraph:
The Contractor and all subcontractors, suppliers, and vendors, shall guarantee that the entire Work will meet all requirements of this contract as to the quality of materials, equipment, and workmanship.
The Contractor, at no cost to the City, shall make any repairs or replacements made necessary by defects in materials, equipment, or workmanship that become evident within one year after the date of recordation of the Notice of Completion.
Within this one year period, the Contractor shall also restore to full compliance with requirements of this contract any portion of the Work which is found to not meet those requirements. The Contractor shall hold the City harmless from claims of any kind arising from damages due to said defects or noncompliance.
Security of this guarantee shall be in the form of a Maintenance Bond furnished to the City by the Contractor. There shall be specific wording in the Maintenance Bond, that includes the guarantee or warranty of the labor and materials for a one year period, commencing from the recording date of the Notice of Completion by the County Recorder. The guaranteed amount shall be for 100 percent of the total amount earned to date as indicated on the final progress payment. The City reserves the right to withhold the retention until the Maintenance Bond has been accepted by the City.
The Contractor shall make all repairs, replacements, and restorations covered by the Maintenance Bond within 10 working days after the date of the Engineer's written notice.
Failure to comply with such notice, will cause the City to file claim against the bond.
Excepted from the Maintenance Bond will be defects caused by acts of God, acts of the City, acts of vandals, or by acts of others outside or beyond the control of the Contractor.
If the work, or any portion thereof, shall be damaged in any way, or if any defective materials or faulty workmanship shall be discovered at any time prior to the final payment, the Contractor shall forthwith, at its own cost and expense, repair said damage, or replace such defective materials, or remedy such faulty workmanship in a manner satisfactory to the Engineer.
4-2 PROTECTION. Add the following:
The Contractor shall assume all risks and expense of interference and delay in his operations, and the protection from or the repair of damage to improvements being built under the contract, as may be caused by water of whatever quantity from floods, storms, industrial waste, irrigation, underground or other sources. However, the Contractor shall be entitled to Reg CC Mtg, June 20, 2023, Page #124
E-7
an extension of time in accordance with the provisions of Subsection 6-4. The Contractor shall also assume full responsibility and expense of protecting, or removing and returning to the site of Work, all equipment or materials under his care endangered by any action of the elements.
Furthermore, the Contractor shall indemnify and hold the City harmless from all claims or suits for damages arising from his operations in dewatering the Work and control of water.
SECTION 5 – LEGAL RELATIONS AND RESPONSIBILITIES
5-7 SAFETY. Add the following:
5-7.2.4 PUBLIC SAFETY DURING NON-WORKING HOURS
Notwithstanding the Contractor's primary responsibility for safety on the job site when the Contractor is not present, the Engineer at Engineer's option after attempting to contact the Contractor may direct City Forces to perform any functions Engineer may deem necessary to ensure public safety at or in the vicinity of the job site. If such procedure is implemented, the Contractor will bear all expenses incurred by the City.
In all cases the judgment of the Engineer shall be final in determining whether or not an unsafe situation exists.
5-7.2.5 WRITTEN COMMUNICATIONS
Contractor’s written communications, including letters, field memoranda, requests for substitution (RFS) and requests for information (RFI) shall be written in a clear and concise manner. In particular, RFSs and RFIs shall clearly describe the condition or issue of concern, the cause of the condition or issue and the proposed solution or specific question being posed to the Engineer. Contractor shall not be entitled to any delays or additional compensation as a result of issues that in the Engineer’s opinion originated with, or were exacerbated by, poor written communications by the Contractor.
SECTION 6 – PROSECUTION AND PROGRESS OF THE WORK
6-1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF WORK. Replace the entire subsection with the following:
6-1.1 General. Within ten (10) working days after the date of the City’s execution of the Contract, the Contractor shall submit a proposed construction schedule to the Engineer for approval. The schedule shall be in accordance with the Specification and these Special Provisions.
Prior to issuing the Notice to Proceed, the Engineer will schedule a Pre-Construction Meeting with the Contractor to review the proposed construction schedule and delivery dates, arrange utility coordination and clarify inspection procedures.
Notwithstanding any other provisions of the Contract, the Contractor shall not be obligated to perform any work and the City will not be obligated to accept or pay for any work performed by the Contractor prior to delivery of a Notice to Proceed. The City's knowledge of work being performed prior to delivery of the Notice to Proceed shall not obligate the City to accept or pay Reg CC Mtg, June 20, 2023, Page #125
E-8
for such work. The Contractor shall provide all required Contract bonds and evidences of insurance prior to commencing work.
6-1.2 Criteria. Construction schedules shall consider the following:
1 - WORK HOURS. Work shall be performed between the hours of 7:00 A.M. and 4:00 P.M. unless otherwise approved by the Engineer. The Contractor will be allowed to work on Fridays when City Hall is scheduled to be closed. No work shall occur on Sundays or holidays. The following days are holidays: Memorial Day May 29, 2023, Independence Day, July 4, 2023; Labor Day, September 4, 2023; Veteran’s Day, November 11, 2023; Thanksgiving, November 23 and 24, 2023. 6-1.3 Compensation. Compensation for all scheduling activities will be made on the lump sum basis per the Contract Unit Price for “MOBILIZATON AND DEMOBILIZATION,” in the Bidder’s Proposal.
6-10 SEQUENCE OF CONSTRUCTION
6-10.1 Multiple Headings. In order to meet the contract schedule, the Contractor will be allowed to initiate and maintain two or more construction headings. However, the Contractor will not be allowed to have multiple phases of work occurring that have the corresponding traffic control devices in conflict with each other.
SECTION 7 - MEASUREMENT AND PAYMENT
7-2 LUMP SUM WORK
Add the following:
Contractor shall submit a detailed schedule of value for all lump sum bid items to the Engineer within 15 days after award of contract.
7-3 PAYMENT
7-3.1 General
Revise paragraph one to read: The unit and lump sum bid prices for each item of work shown on the proposal shall include full compensation for furnishing the labor, materials, tools, and equipment and doing all the work, including restoring all existing improvements, to complete the item of work in place and no other compensation will be allowed thereafter. Payment for incidental items of work not separately listed shall be included in the prices shown for the other related items of work. The following items of work pertain to the bid items included within the Proposal:
Reg CC Mtg, June 20, 2023, Page #126
E-9
Item No. 1 General Requirements including Mobilization and Demobilization and the cost to secure bonds and
insurance, movement of personnel, equipment,
materials and incidentals to and from the project
sites, securing a temporary construction yard,
maintaining the project in a safe, clean and orderly
manner during construction and final cleanup of the
work and staging sites.
Included in this item are any costs associated with
construction activities including construction survey
required to conform to the notes on the
construction plans, contract general conditions and
site supervision including safety management plan.
Payment for “General Requirements” shall be made
at the lump sum price indicated in the Bid Sheets
and progress payments shall be made upon the
judgment of the Engineer as percent complete.
Item No. 2 Core Drill Penetration Holes at Exterior Wall. Work under this item shall include, but not be limited to, all labor, tools, equipment, and material costs for all actions necessary to provide holes in the existing exterior wall required for the complete installation of the project..
Item No. 3 Install Generator Connect Cabinet including Quick Connect. Work under this item shall include, but not be limited to, all labor, tools, equipment, and material costs for all actions necessary to provide the installation of the generator connect cabinet including quick connect.
Item No. 4 Install New Circuit Breaker in Existing Main Switchboard. Work under this item shall include, but not be limited to, all labor, tools, equipment, and material costs for all actions necessary to provide the installation of the new circuit breaker in the existing main switchboard.
Item No. 5 Install Kirk-Key Interlock. Work under this item shall include, but not be limited to, all labor, tools, equipment, and material costs for all actions necessary to provide the installation of the Kirk-Key interlock.
Item No. 6 Install Conduits and Wiring including 20’ and 100’ Camlock Extension Wires. Work under this item shall
include, but not be limited to, all labor, tools, equipment, and material costs for all actions necessary to provide the installation of the all conduits and wiring required for the Reg CC Mtg, June 20, 2023, Page #127
E-10
complete installation of the project.
Item No. 7 Lighting. Work under this item shall include, but not be limited to, all labor, tools, equipment, and material costs for all actions necessary to provide the installation of all light fixtures required for the complete installation of the project.
Item No. 8 Install GFI Receptacle for Battery Charger. Work under this item shall include, but not be limited to, all labor, tools, equipment, and material costs for all actions necessary to provide the installation of the GFI receptacle for the battery charger.
Item No. 9 Support Testing of Rental Generator. Work under this item shall include, but not be limited to, all labor, tools, equipment, and material costs for all actions necessary to support the startup and testing of the rental generator by the rental agency.
Item No. 10 Support Testing of Permanent Generator. Work under this item shall include, but not be limited to, all labor, tools, equipment, and material costs for all actions necessary to support the startup and testing of the permanent generator by the generator manufacturer..
7-4.3 MARKUP. Replace the entire subsection with the following:
The markups mentioned hereinafter shall include, but are not limited to, all costs for the services of superintendents, project managers, timekeepers and other personnel not working directly on the change order, and pickup or yard trucks used by the above personnel. These costs shall not be reported as labor or equipment elsewhere except when actually performing work directly on the change order and then shall only be reported at the labor classification of the work performed.
(a) Work by Contractor. The following percentages shall be added to the Contractor’s costs and shall constitute the mark-up for all overhead and profit, which shall be deemed to include all items of expense not specifically designated as cost or equipment rental in Subsections 3- 7-4.2.1, 7-4.2.2, and 7-4.2.3.
Labor 20
Materials 15
Equipment Rental 15
Other Expenditures 15
Reg CC Mtg, June 20, 2023, Page #128
E-11
To the sum of the costs and markups provided for in this subsection, one (1) percent shall be added as compensation for bonding.
(b) Work by Subcontractor. When any part of the extra work is performed by a subcontractor, the markup established in 7-4.2.1 shall be applied to the subcontractor’s actual cost of such work. A markup of ten (10) percent on the first $5,000 of the subcontracted portion of the extra work and a mark-up of 5 percent on work added in excess of $5,000 of the subcontracted portion of the extra work may be added by the Contractor.
The markups specified in parts (a) and (b) above shall be considered as including, but not limited to, the Contractor’s labor costs for personnel not working directly on the extra work, including the cost of any tools and equipment that they may use. Such costs shall not be reported as labor or equipment costs elsewhere except when they are actually used in the performance of the extra work. Labor costs shall in that case be reported for the labor classification corresponding to the type and nature of extra work performed.
Reg CC Mtg, June 20, 2023, Page #129
APPENDIX I
CONSTRUCTION AND DEMOLITION
DEBRIS RECYCLING SUMMARY
Reg CC Mtg, June 20, 2023, Page #130
Reg CC Mtg, June 20, 2023, Page #131
APPENDIX II
CITY BUSINESS LICENSE APPLICATION
Reg CC Mtg, June 20, 2023, Page #132
Reg CC Mtg, June 20, 2023, Page #133
APPENDIX III
CITY OF LOMITA
STANDARD PLANS
Reg CC Mtg, June 20, 2023, Page #134
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STAND-BY GENERATOR AT APPIAN WAY
SECTION F – ELECTRICAL SPECIFICATIONS
SPECIFICATIONS TABLE OF CONTENTS
Section # Name
016400 Owner Furnished / Contractor Installed Products
260500 Common Work Results for Electrical
260519 Low-Voltage Electrical Power Conductors and Cables 260526 Grounding and Bonding for Electrical Systems
260529 Hangers and Supports for Electrical Systems
260533 Raceway and Boxes for Electrical Systems
260548 Vibration and Seismic Controls for Electrical Systems 260553 Identification for Electrical Systems
263213 Diesel Engine Generators and Connection Box
Reg CC Mtg, June 20, 2023, Page #135
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
OWNER FURNISHED PRODUCTS 016400
SECTION 01 64 00 OWNER FURNISHED PRODUCTS
PART 1 GENERAL
1.1 RELATEDDOCUMENTS
A. Construction Drawings, Technical Specifications, Addenda, and general provisions of the Contract.
1.2 SECTION INCLUDES
A. Requirements for installing Owner-furnished products, including providing miscellaneous items and accessories for a complete, functioning installation.
1.3 PRODUCT HANDLING
A. Protection: Contractor shall use means necessary to protect the materials of this Section before, during, and after installation and to protect completed Work, including products installed by others.
B. Replacements: In the event of damage, Contractor shall immediately repair all damaged and defective Work to satisfaction of Owner's Representative, at no change in Contract Time and Contract Sum.
PART 2 PRODUCTS
2.1 OWNER-FURNISHED/CONTRACTOR-INSTALLED (OFCI) PRODUCTS A. Products Identified with Contractor Responsibility for Installation:
1. Contractor shall verify mounting and utility requirementsfor accepted products.
2. Contractor shall provide mounting and utility rough-insfor OFCI products. a. Rough-in locations, sizes, capacities and similar type shall be as indicated and required by product manufacturers.
b. If the Owner substitutes items similar to those scheduled there shall be no change in roughin cost, unless substitution occurs after rough-in has been completed or rough-in involves other mounting requirements, utilities of different capacity than those required by item originallyspecified.
3. For items Designated to Be Owner- or Vendor-Furnished: Owner or its vendor will furnish manufacturer's literature or information, shop drawings, or appropriate information for preparing Reg CC Mtg, June 20, 2023, Page #136
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
OWNER FURNISHED PRODUCTS 016400
required shop drawings.
B. Installation Instructions: Approved manufacturer's printed descriptions, specifications and recommendationsshall govern the Work, unless specifically indicated otherwise.
C. Electrical Components: Contractorshall comply with requirementsspecified in Division 26 - Electrical, including California Electrical Code (CEC).
2.2 OWNER-FURNISHED/CONTRACTOR-INSTALLED PRODUCT REQUIREMENTS A. Products Furnished by Owner and Installed by Contractor:
1. Contractor shall coordinate delivery of OFCI products. Owner will furnish products to coincide with construction schedule the following products/equipment:
a. Rental Generator
b. Final Generator
c. Load Bank
2. Owner will:
a. Furnish standard integral components of products.
b. Deliver products to site. Contractor shall assist Owner in offloading products.
3. The Contractor shall:
a. Receive products at site and give written receipt for product at time of delivery, noting visible defects and omissions; if such declaration is not given, the Contractor shall assume responsibility for such defects and omissions.
b. Store products until ready for installation and protect from loss and damage. c. Uncrate, assemble and set products inplace.
d. Install products in accordance with manufacturer's recommendations, instructions and shop drawings under supervision of manufacturer's representative where specified, supplying labor and material required and making mechanical, plumbing and electrical connections necessary to operate equipment.
e. Where so specified, installation shall be only by installer approved by manufacturer. If known, approved installer is identified on the Drawings or in the Specifications. f. Provide and install backing for all products weighing 20 pounds or more. g. Treat all Owner or Vendor supplied products with the same care as all Contractor furnished items.
PART 3 EXECUTION
3.1 SURFACE CONDITIONS
Reg CC Mtg, June 20, 2023, Page #137
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
OWNER FURNISHED PRODUCTS 016400
A. Inspection:
1. Prior to commencing Work, Contractor shall verify that Work specified in other Sections has been properly completed and installed as specified to allow for installation of all materials and methods required of this Section.
2. Contractor shall verify that new and existing products and conditions are satisfactory for installation or relocation of OFCI products. If unsatisfactory conditions exist, do not commence the installation until such conditions have been corrected.
B. Discrepancies:
1. In the event of discrepancy, Contractorshall immediately notify the Owner's Representative.
2. Contractor shall not proceed with installation in areas of discrepancy until all such discrepancies have been resolved.
3.2 INSTALLATION
A. Contractor shall relocate and reinstall existing products in accordance with Contract Documents and reviewed shop drawings, original manufacturer'sinstructions and recommendationsif applicable and as directed.
B. Contractor shall install Owner-furnished products in accordance with reviewed shop drawings and manufacturer's printed instructions, as applicable.
3.3 ADJUSTING AND CLEANING
A. Contractor shall adjust products as necessary and as directed by Owner's Representative.
B. Contractor shall clean all new OFCIproducts.
C. Contractor shall protect OFCI productsfrom damage until Contract Completion.
END OF SECTION
Reg CC Mtg, June 20, 2023, Page #138
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
COMMON WORK RESULTS FOR ELECTRICAL SYSTEMS 260500
SECTION 260500 COMMON WORK RESULTS FOR ELECTRICAL
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract.
1.2 SUMMARY
A. Section Includes:
1. Electrical equipment coordination and installation.
2. Sleeves for raceways and cables.
3. Sleeve seals.
4. Grout.
5. Common electrical installation requirements.
1.3 DEFINITIONS
A. EPDM: Ethylene-propylene-diene terpolymer rubber.
B. NBR: Acrylonitrile-butadiene rubber.
1.4 SUBMITTALS
A. Product Data: For sleeve seals.
1.5 COORDINATION
A. Coordinate arrangement, mounting, and support of electrical equipment:
1. To allow maximum possible headroom unless specific mounting heights that reduce headroom are indicated.
2. To provide for ease of disconnecting the equipment with minimum interference to other installations.
3. To allow right of way for piping and conduit installed at required slope.
4. So connecting raceways, cables, wireways, cable trays, and busways will be clear of obstructions and of the working and access space of other equipment.
B. Coordinate installation of required supporting devices and set sleeves in cast-in-place concrete, masonry walls, and other structural components as they are constructed.
Reg CC Mtg, June 20, 2023, Page #139
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
COMMON WORK RESULTS FOR ELECTRICAL SYSTEMS 260500
Coordinate location of access panels and doors for electrical items that are behind finished surfaces or otherwise concealedPART 2 PRODUCTS
2.1 SLEEVES FOR RACEWAYS AND CABLES
A. Steel Pipe Sleeves: ASTM A 53/A 53M, Type E, Grade B, Schedule 40, galvanized steel, plain ends.
B. Cast-Iron Pipe Sleeves: Cast or fabricated "wall pipe," equivalent to ductile-iron pressure pipe, with plain ends and integral waterstop, unless otherwise indicated.
C. Sleeves for Rectangular Openings: Galvanized sheet steel.
1. Minimum Metal Thickness:
a. For sleeve cross-section rectangle perimeter less than 50 inches (1270 mm) and no side more than 16 inches (400 mm), thickness shall be 0.052 inch (1.3 mm). b. For sleeve cross-section rectangle perimeter equal to, or more than, 50 inches (1270 mm) and 1 or more sides equal to, or more than, 16 inches (400 mm), thickness shall be 0.138 inch (3.5 mm).
2.2 SLEEVE SEALS
A. Description: Modular sealing device, designed for field assembly, to fill annular space between sleeve and raceway or cable.
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Advance Products & Systems, Inc.
b. Calpico, Inc.
c. Metraflex Co.
d. Pipeline Seal and Insulator, Inc.
2. Sealing Elements: EPDM, NBR interlocking links shaped to fit surface of cable or conduit.
Include type and number required for material and size of raceway or cable.
3. Pressure Plates: Plastic, Carbon steel, Stainless steel. Include two for each sealing element.
4. Connecting Bolts and Nuts: Carbon steel with corrosion-resistant coating, Stainless steel of length required to secure pressure plates to sealing elements. Include one for each sealing element.
2.3 GROUT
A. Nonmetallic, Shrinkage-Resistant Grout: ASTM C 1107, factory-packaged, nonmetallic aggregate grout, noncorrosive, nonstaining, mixed with water to consistency suitable for application and a 30-minute working time.
Reg CC Mtg, June 20, 2023, Page #140
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
COMMON WORK RESULTS FOR ELECTRICAL SYSTEMS 260500
PART 3 EXECUTION
3.1 COMMON REQUIREMENTS FOR ELECTRICAL INSTALLATION
A. Comply with NECA 1.
B. Measure indicated mounting heights to bottom of unit for suspended items and to center of unit for wall-mounting items.
C. Headroom Maintenance: If mounting heights or other location criteria are not indicated, arrange and install components and equipment to provide maximum possible headroom consistent with these requirements.
D. Equipment: Install to facilitate service, maintenance, and repair or replacement of components of both electrical equipment and other nearby installations. Connect in such a way as to facilitate future disconnecting with minimum interference with other items in the vicinity.
E. Right of Way: Give to piping systems installed at a required slope.
3.2 SLEEVE INSTALLATION FOR ELECTRICAL PENETRATIONS
A. Electrical penetrations occur when raceways, cables, wireways, cable trays, or busways penetrate concrete slabs, concrete or masonry walls, or fire-rated floor and wall assemblies.
B. Concrete Slabs and Walls: Install sleeves for penetrations unless core-drilled holes or formed openings are used. Install sleeves during erection of slabs and walls.
C. Use pipe sleeves unless penetration arrangement requires rectangular sleeved opening.
D. Fire-Rated Assemblies: Install sleeves for penetrations of fire-rated floor and wall assemblies unless openings compatible with firestop system used are fabricated during construction of floor or wall.
E. Cut sleeves to length for mounting flush with both surfaces of walls.
F. Extend sleeves installed in floors 2 inches (50 mm) above finished floor level.
G. Size pipe sleeves to provide 1/4-inch (6.4-mm) annular clear space between sleeve and raceway or cable, unless indicated otherwise.
H. Seal space outside of sleeves with grout for penetrations of concrete and masonry
1. Promptly pack grout solidly between sleeve and wall so no voids remain. Tool exposed surfaces smooth; protect grout while curing.
I. Interior Penetrations of Non-Fire-Rated Walls and Floors: Seal annular space between sleeve and raceway or cable, using joint sealant appropriate for size, depth, and location of joint.
J. Fire-Rated-Assembly Penetrations: Maintain indicated fire rating of walls, partitions, ceilings, and floors at raceway and cable penetrations. Install sleeves and seal raceway and cable Reg CC Mtg, June 20, 2023, Page #141
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
COMMON WORK RESULTS FOR ELECTRICAL SYSTEMS 260500
penetration sleeves with firestop materials. Comply with requirements in Division 07 Section "Penetration Firestopping."
K. Roof-Penetration Sleeves: Seal penetration of individual raceways and cables with flexible boottype flashing units applied in coordination with roofing work.
L. Aboveground, Exterior-Wall Penetrations: Seal penetrations using steel, cast-iron pipe sleeves and mechanical sleeve seals. Select sleeve size to allow for 1-inch (25-mm) annular clear space between pipe and sleeve for installing mechanical sleeve seals.
M. Underground, Exterior-Wall Penetrations: Install cast-iron pipe sleeves. Size sleeves to allow for 1-inch (25-mm) annular clear space between raceway or cable and sleeve for installing mechanical sleeve seals.
3.3 SLEEVE-SEAL INSTALLATION
A. Install to seal exterior wall penetrations.
B. Use type and number of sealing elements recommended by manufacturer for raceway or cable material and size. Position raceway or cable in center of sleeve. Assemble mechanical sleeve seals and install in annular space between raceway or cable and sleeve. Tighten bolts against pressure plates that cause sealing elements to expand and make watertight seal.
3.4 FIRESTOPPING
A. Apply firestopping to penetrations of fire-rated floor and wall assemblies for electrical installations to restore original fire-resistance rating of assembly.
END OF SECTION 260500
Reg CC Mtg, June 20, 2023, Page #142
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLESS 260519 SECTION 260519 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES PART 1 GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract.
1.2 SUMMARY
A. This Section includes the following:
1. Building wires and cables rated 600 V and less.
2. Connectors, splices, and terminations rated 600 V and less.
3. Sleeves and sleeve seals for cables.
1.3 DEFINITIONS
A. EPDM: Ethylene-propylene-diene terpolymer rubber.
B. NBR: Acrylonitrile-butadiene rubber.
1.4 SUBMITTALS
A. Product Data: For each type of product indicated.
B. Qualification Data: For testing agency.
C. Field quality-control test reports.
1.5 QUALITY ASSURANCE
A. Testing Agency Qualifications: An independent agency, with the experience and capability to conduct the testing indicated, that is a member company of the InterNational Electrical Testing Association or is a nationally recognized testing laboratory (NRTL) as defined by OSHA in 29 CFR 1910.7, and that is acceptable to authorities having jurisdiction.
1. Testing Agency's Field Supervisor: Person currently certified by the InterNational Electrical Testing Association or the National Institute for Certification in Engineering Technologies to supervise on-site testing specified in Part 3.
B. Electrical Components, Devices, and Accessories: Listed and label.6.ed as defined in NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use.
C. Comply with NFPA 70.
Reg CC Mtg, June 20, 2023, Page #143
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLESS 260519
1.6 COORDINATION
A. Set sleeves in cast-in-place concrete, masonry walls, and other structural components as they are constructed.
PART 2 PRODUCTS
2.1 CONDUCTORS AND CABLES
A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
B. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
1. Alcan Products Corporation; Alcan Cable Division.
2. American Insulated Wire Corp.; a Leviton Company.
3. General Cable Corporation.
4. Senator Wire & Cable Company.
5. Southwire Company.
C. Copper Conductors: Comply with NEMA WC 70.
D. Conductor Insulation: Comply with NEMA WC 70 for Types THHN-THWN.
2.2 CONNECTORS AND SPLICES
A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
B. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
1. AFC Cable Systems, Inc.
2. Hubbell Power Systems, Inc.
3. O-Z/Gedney; EGS Electrical Group LLC.
4. 3M; Electrical Products Division.
5. Tyco Electronics Corp.
C. Description: Factory-fabricated connectors and splices of size, ampacity rating, material, type, and class for application and service indicated.
2.3 SLEEVES FOR CABLES
A. Steel Pipe Sleeves: ASTM A 53/A 53M, Type E, Grade B, Schedule 40, galvanized steel, plain ends.
Reg CC Mtg, June 20, 2023, Page #144
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLESS 260519 B. Cast-Iron Pipe Sleeves: Cast or fabricated "wall pipe," equivalent to ductile-iron pressure pipe, with plain ends and integral waterstop, unless otherwise indicated.
C. Sleeves for Rectangular Openings: Galvanized sheet steel with minimum 0.052- or 0.138-inch (1.3- or 3.5-mm) thickness as indicated and of length to suit application.
D. Coordinate sleeve selection and application with selection and application of firestopping.
2.4 SLEEVE SEALS
A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
B. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
1. Advance Products & Systems, Inc.
2. Calpico, Inc.
3. Metraflex Co.
4. Pipeline Seal and Insulator, Inc.
C. Description: Modular sealing device, designed for field assembly, to fill annular space between sleeve and cable.
1. Sealing Elements: EPDM, NBR interlocking links shaped to fit surface of cable or conduit.
Include type and number required for material and size of raceway or cable.
2. Pressure Plates: Plastic, Carbon steel, Stainless steel. Include two for each sealing element.
3. Connecting Bolts and Nuts: Carbon steel with corrosion-resistant coating, Stainless steel of length required to secure pressure plates to sealing elements. Include one for each sealing element.
PART 3 EXECUTION
3.1 CONDUCTOR MATERIAL APPLICATIONS
A. Feeders: Copper. Solid for No. 10 AWG and smaller; stranded for No. 8 AWG and larger.
B. Branch Circuits: Copper. Solid for No. 10 AWG and smaller; stranded for No. 8 AWG and larger.
3.2 CONDUCTOR INSULATION AND MULTICONDUCTOR CABLE APPLICATIONS
AND WIRING METHODS
A. Service Entrance: Type THHN-THWN, single conductors in raceway.
B. Exposed Feeders: Type THHN-THWN, single conductors in raceway.
Reg CC Mtg, June 20, 2023, Page #145
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLESS 260519 C. Cord Drops and Portable Appliance Connections: Type SO, hard service cord with stainlesssteel, wire-mesh, strain relief device at terminations to suit application.
D. Class 1 Control Circuits: Type THHN-THWN, in raceway.
E. Class 2 Control Circuits: Type THHN-THWN, in raceway.
3.3 INSTALLATION OF CONDUCTORS AND CABLES
A. Conceal cables in finished walls, ceilings, and floors, unless otherwise indicated.
B. Use manufacturer-approved pulling compound or lubricant where necessary; compound used must not deteriorate conductor or insulation. Do not exceed manufacturer's recommended maximum pulling tensions and sidewall pressure values.
C. Use pulling means, including fish tape, cable, rope, and basket-weave wire/cable grips, that will not damage cables or raceway.
D. Install exposed cables parallel and perpendicular to surfaces of exposed structural members, and follow surface contours where possible.
E. Support cables according to Division 26 Section "Hangers and Supports for Electrical Systems." F. Identify and color-code conductors and cables according to Division 26 Section "Identification for Electrical Systems."
3.4 CONNECTIONS
A. Tighten electrical connectors and terminals according to manufacturer's published torquetightening values. If manufacturer's torque values are not indicated, use those specified in UL 486A and UL 486B.
B. Make splices and taps that are compatible with conductor material and that possess equivalent or better mechanical strength and insulation ratings than unspliced conductors.
1. Use oxide inhibitor in each splice and tap conductor for aluminum conductors.
C. Wiring at Outlets: Install conductor at each outlet, with at least [6 inches (150 mm)] [12 inches (300 mm)] of slack.
3.5 SLEEVE INSTALLATION FOR ELECTRICAL PENETRATIONS
D. Concrete Slabs and Walls: Install sleeves for penetrations unless core-drilled holes or formed openings are used. Install sleeves during erection of slabs and walls.
E. Use pipe sleeves unless penetration arrangement requires rectangular sleeved opening.
F. Rectangular Sleeve Minimum Metal Thickness:
Reg CC Mtg, June 20, 2023, Page #146
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLESS 260519
1. For sleeve rectangle perimeter less than 50 inches (1270 mm) and no side greater than 16 inches (400 mm), thickness shall be 0.052 inch (1.3 mm).
2. For sleeve rectangle perimeter equal to, or greater than, 50 inches (1270 mm) and 1 or more sides equal to, or greater than, 16 inches (400 mm), thickness shall be 0.138 inch (3.5 mm).
G. Fire-Rated Assemblies: Install sleeves for penetrations of fire-rated floor and wall assemblies unless openings compatible with firestop system used are fabricated during construction of floor or wall.
H. Cut sleeves to length for mounting flush with both wall surfaces.
I. Extend sleeves installed in floors 2 inches (50 mm) above finished floor level.
J. Size pipe sleeves to provide 1/4-inch (6.4-mm) annular clear space between sleeve and cable unless sleeve seal is to be installed or unless seismic criteria require different clearance.
K. Seal space outside of sleeves with grout for penetrations of concrete and masonry and with approved joint compound for gypsum board assemblies.
L. Roof-Penetration Sleeves: Seal penetration of individual cables with flexible boot-type flashing units applied in coordination with roofing work.
M. Aboveground Exterior-Wall Penetrations: Seal penetrations using sleeves and mechanical sleeve seals. Size sleeves to allow for 1-inch (25-mm) annular clear space between pipe and sleeve for installing mechanical sleeve seals.
N. Underground Exterior-Wall Penetrations: Install cast-iron "wall pipes" for sleeves. Size sleeves to allow for 1-inch (25-mm) annular clear space between cable and sleeve for installing mechanical sleeve seals.
3.6 SLEEVE-SEAL INSTALLATION
A. Install to seal underground exterior-wall penetrations.
B. Use type and number of sealing elements recommended by manufacturer for cable material and size. Position cable in center of sleeve. Assemble mechanical sleeve seals and install in annular space between cable and sleeve. Tighten bolts against pressure plates that cause sealing elements to expand and make watertight seal.
3.7 FIRESTOPPING
A. Apply firestopping to electrical penetrations of fire-rated floor and wall assemblies to restore original fire-resistance rating of assembly.
3.8 FIELD QUALITY CONTROL
A. Testing Agency: Engage a qualified testing agency to perform tests and inspections and prepare test reports.
Reg CC Mtg, June 20, 2023, Page #147
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLESS 260519 B. Perform tests and inspections and prepare test reports.
C. Tests and Inspections:
1. After installing conductors and cables and before electrical circuitry has been energized, test service entrance and feeder conductors, and conductors feeding the following critical equipment and services for compliance with requirements.
2. Perform each visual and mechanical inspection and electrical test stated in NETA Acceptance Testing Specification. Certify compliance with test parameters.
3. Infrared Scanning: After Substantial Completion, but not more than 60 days after Final Acceptance, perform an infrared scan of each splice in cables and conductors No. 3 AWG and larger. Remove box and equipment covers so splices are accessible to portable scanner.
a. Follow-up Infrared Scanning: Perform an additional follow-up infrared scan of each splice 11 months after date of Substantial Completion.
b. Instrument: Use an infrared scanning device designed to measure temperature or to detect significant deviations from normal values. Provide calibration record for device.
c. Record of Infrared Scanning: Prepare a certified report that identifies splices checked and that describes scanning results. Include notation of deficiencies detected, remedial action taken, and observations after remedial action.
D. Test Reports: Prepare a written report to record the following:
1. Test procedures used.
2. Test results that comply with requirements.
3. Test results that do not comply with requirements and corrective action taken to achieve compliance with requirements.
E. Remove and replace malfunctioning units and retest as specified above.
END OF SECTION 260519
Reg CC Mtg, June 20, 2023, Page #148
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS 260526
SECTION 260526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions.
1.2 SUMMARY
A. Section Includes: Grounding systems and equipment.
1.3 SUBMITTALS
A. Product Data: For each type of product indicated.
B. Informational Submittals: Plans showing dimensioned as-built locations of grounding features specified in "Field Quality Control" Article, including the following:
1. Test wells.
2. Ground rods.
3. Ground rings.
4. Grounding arrangements and connections for separately derived systems.
5. Grounding for sensitive electronic equipment.
C. Qualification Data: For qualified testing agency and testing agency's field supervisor.
D. Field quality-control reports.
E. Operation and Maintenance Data: For grounding to include in emergency, operation, and maintenance manuals. Include the following:
1. Instructions for periodic testing and inspection of grounding features at grounding connections for separately derived systems based on NETA MTS, NFPA 70B. a. Tests shall determine if ground-resistance or impedance values remain within specified maximums, and instructions shall recommend corrective action if values do not.
b. Include recommended testing intervals.
1.4 QUALITY ASSURANCE
A. Testing Agency Qualifications: Member company of NETA or an NRTL.
Reg CC Mtg, June 20, 2023, Page #149
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS 260526
1. Testing Agency's Field Supervisor: Currently certified by NETA to supervise on-site testing.
B. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.
C. Comply with UL 467 for grounding and bonding materials and equipment.
PART 2 PRODUCTS
2.1 CONDUCTORS
A. Insulated Conductors: Copper wire or cable insulated for 600 V unless otherwise required by applicable Code or authorities having jurisdiction.
B. Bare Copper Conductors:
1. Solid Conductors: ASTM B 3.
2. Stranded Conductors: ASTM B 8.
3. Tinned Conductors: ASTM B 33.
4. Bonding Cable: 28 kcmil, 14 strands of No. 17 AWG conductor, 1/4 inch (6 mm) in diameter.
5. Bonding Conductor: No. 4 or No. 6 AWG, stranded conductor.
6. Bonding Jumper: Copper tape, braided conductors terminated with copper ferrules; 1-5/8 inches (41 mm) wide and 1/16 inch (1.6 mm) thick.
7. Tinned Bonding Jumper: Tinned-copper tape, braided conductors terminated with copper ferrules; 1-5/8 inches (41 mm) wide and 1/16 inch (1.6 mm) thick.
C. Bare Grounding Conductor and Conductor Protector for Wood Poles:
1. No. 4 AWG minimum, soft-drawn copper.
2. Conductor Protector: Half-round PVC or wood molding; if wood, use pressure-treated fir, cypress, or cedar.
D. Grounding Bus: Predrilled rectangular bars of annealed copper, 1/4 by 4 inches (6.3 by 100 mm) in cross section, with 9/32-inch (7.14-mm) holes spaced 1-1/8 inches (28 mm) apart. Stand-off insulators for mounting shall comply with UL 891 for use in switchboards, 600 V. Lexan or PVC, impulse tested at 5000 V.
2.2 CONNECTORS
A. Listed and labeled by an NRTL acceptable to authorities having jurisdiction for applications in which used and for specific types, sizes, and combinations of conductors and other items connected.
B. Bolted Connectors for Conductors and Pipes: Copper or copper alloy, pressure type with at least two bolts.
Reg CC Mtg, June 20, 2023, Page #150
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS 260526
1. Pipe Connectors: Clamp type, sized for pipe.
C. Welded Connectors: Exothermic-welding kits of types recommended by kit manufacturer for materials being joined and installation conditions.
D. Bus-bar Connectors: Mechanical type, cast silicon bronze, solderless exothermic-type wire terminals, and long-barrel, two-bolt connection to ground bus bar.
PART 3 EXECUTION
3.1 APPLICATIONS
A. Conductors: Install solid conductor for No. 8 AWG and smaller, and stranded conductors for No. 6 AWG and larger unless otherwise indicated.
B. Isolated Grounding Conductors: Green-colored insulation with continuous yellow stripe. On feeders with isolated ground, identify grounding conductor where visible to normal inspection, with alternating bands of green and yellow tape, with at least three bands of green and two bands of yellow.
C. Conductor Terminations and Connections:
1. Pipe and Equipment Grounding Conductor Terminations: Bolted connectors.
2. Connections to Structural Steel: Welded connectors.
3.2 INSTALLATION
A. Grounding Conductors: Route along shortest and straightest paths possible unless otherwise indicated or required by Code. Avoid obstructing access or placing conductors where they may be subjected to strain, impact, or damage.
3.3 FIELD QUALITY CONTROL
A. Testing Agency: Engage a qualified testing agency to perform tests and inspections.
B. Manufacturer's Field Service: Engage a factory-authorized service representative to inspect, test, and adjust components, assemblies, and equipment installations, including connections.
C. Perform tests and inspections.
1. Manufacturer's Field Service: Engage a factory-authorized service representative to inspect components, assemblies, and equipment installations, including connections, and to assist in testing.
D. Tests and Inspections:
Reg CC Mtg, June 20, 2023, Page #151
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS 260526
1. After installing grounding system but before permanent electrical circuits have been energized, test for compliance with requirements.
2. Inspect physical and mechanical condition. Verify tightness of accessible, bolted, electrical connections with a calibrated torque wrench according to manufacturer's written instructions.
3. Test completed grounding system at each location where a maximum ground-resistance level is specified, at service disconnect enclosure grounding terminal. Make tests at ground rods before any conductors are connected.
a. Measure ground resistance no fewer than two full days after last trace of precipitation and without soil being moistened by any means other than natural drainage or seepage and without chemical treatment or other artificial means of reducing natural ground resistance.
b. Perform tests by fall-of-potential method according to IEEE 81.
E. Grounding system will be considered defective if it does not pass tests and inspections.
F. Prepare test and inspection reports.
G. Excessive Ground Resistance: If resistance to ground exceeds specified values, notify Architect promptly and include recommendations to reduce ground resistance.
END OF SECTION 260526
Reg CC Mtg, June 20, 2023, Page #152
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS 260529
SECTION 260529 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract.
1.2 SUMMARY
A. This Section includes the following:
1. Hangers and supports for electrical equipment and systems.
2. Construction requirements for concrete bases.
B. Related Sections include the following:
1. Division 26 Section "Vibration And Seismic Controls For Electrical Systems" for products and installation requirements necessary for compliance with seismic criteria.
1.3 DEFINITIONS
A. EMT: Electrical metallic tubing.
B. IMC: Intermediate metal conduit.
C. RMC / GRC: Rigid metal conduit.
1.4 PERFORMANCE REQUIREMENTS
A. Delegated Design: Design supports for multiple raceways, including comprehensive engineering analysis by a qualified professional engineer, using performance requirements and design criteria indicated.
B. Design supports for multiple raceways capable of supporting combined weight of supported systems and its contents.
C. Design equipment supports capable of supporting combined operating weight of supported equipment and connected systems and components.
D. Rated Strength: Adequate in tension, shear, and pullout force to resist maximum loads calculated or imposed for this Project, with a minimum structural safety factor of five times the applied force.
Reg CC Mtg, June 20, 2023, Page #153
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS 260529
1.5 SUBMITTALS
A. Product Data: For the following:
1. Steel slotted support systems.
2. Nonmetallic slotted support systems.
B. Shop Drawings: Show fabrication and installation details and include calculations for the following:
1. Trapeze hangers. Include Product Data for components.
2. Steel slotted channel systems. Include Product Data for components.
3. Nonmetallic slotted channel systems. Include Product Data for components.
4. Equipment supports.
C. Welding certificates.
1.6 QUALITY ASSURANCE
A. Welding: Qualify procedures and personnel according to AWS D1.1/D1.1M, "Structural Welding Code - Steel."
B. Comply with NFPA 70.
1.7 COORDINATION
A. Coordinate size and location of concrete bases. Cast anchor-bolt inserts into bases.
PART 2 PRODUCTS
2.1 SUPPORT, ANCHORAGE, AND ATTACHMENT COMPONENTS
A. Steel Slotted Support Systems: Comply with MFMA-4, factory-fabricated components for field assembly.
1. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
2. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Allied Tube & Conduit.
b. Cooper B-Line, Inc.; a division of Cooper Industries. c. ERICO International Corporation.
d. GS Metals Corp.
e. Thomas & Betts Corporation.
f. Unistrut; Tyco International, Ltd.
Reg CC Mtg, June 20, 2023, Page #154
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS 260529
g. Wesanco, Inc.
3. Metallic Coatings: Hot-dip galvanized after fabrication and applied according to MFMA4.
4. Nonmetallic Coatings: Manufacturer's standard PVC, polyurethane, or polyester coating applied according to MFMA-4.
5. Painted Coatings: Manufacturer's standard painted coating applied according to MFMA4.
6. Channel Dimensions: Selected for applicable load criteria.
B. Nonmetallic Slotted Support Systems: Structural-grade, factory-formed, glass-fiber-resin channels and angles with 9/16-inch- (14-mm-) diameter holes at a maximum of 8 inches (200 mm) o.c., in at least 1 surface.
1. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
2. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Allied Tube & Conduit.
b. Cooper B-Line, Inc.; a division of Cooper Industries. c. Fabco Plastics Wholesale Limited.
d. Seasafe, Inc.
3. Fittings and Accessories: Products of channel and angle manufacturer and designed for use with those items.
4. Fitting and Accessory Materials: Same as channels and angles, except metal items may be stainless steel.
5. Rated Strength: Selected to suit applicable load criteria.
C. Raceway and Cable Supports: As described in NECA 1 and NECA 101.
D. Conduit and Cable Support Devices: Steel hangers, clamps, and associated fittings, designed for types and sizes of raceway or cable to be supported.
E. Support for Conductors in Vertical Conduit: Factory-fabricated assembly consisting of threaded body and insulating wedging plug or plugs for non-armored electrical conductors or cables in riser conduits. Plugs shall have number, size, and shape of conductor gripping pieces as required to suit individual conductors or cables supported. Body shall be malleable iron.
F. Structural Steel for Fabricated Supports and Restraints: ASTM A 36/A 36M, steel plates, shapes, and bars; black and galvanized.
G. Mounting, Anchoring, and Attachment Components: Items for fastening electrical items or their supports to building surfaces include the following:
1. Powder-Actuated Fasteners: Threaded-steel stud, for use in hardened portland cement concrete, steel, or wood, with tension, shear, and pullout capacities appropriate for supported loads and building materials where used.
Reg CC Mtg, June 20, 2023, Page #155
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS 260529
a. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
b. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
1) Hilti Inc.
2) ITW Ramset/Red Head; a division of Illinois Tool Works, Inc. 3) MKT Fastening, LLC.
4) Simpson Strong-Tie Co., Inc.; Masterset Fastening Systems Unit.
2. Mechanical-Expansion Anchors: Insert-wedge-type, zinc-coated, stainless steel, for use in hardened portland cement concrete with tension, shear, and pullout capacities appropriate for supported loads and building materials in which used. a. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
b. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
1) Cooper B-Line, Inc.; a division of Cooper Industries. 2) Empire Tool and Manufacturing Co., Inc.
3) Hilti Inc.
4) ITW Ramset/Red Head; a division of Illinois Tool Works, Inc. 5) MKT Fastening, LLC.
3. Concrete Inserts: Steel or malleable-iron, slotted support system units similar to MSS Type 18; complying with MFMA-4 or MSS SP-58.
4. Clamps for Attachment to Steel Structural Elements: MSS SP-58, type suitable for attached structural element.
5. Through Bolts: Structural type, hex head, and high strength. Comply with ASTM A 325.
6. Toggle Bolts: All-steel springhead type.
7. Hanger Rods: Threaded steel.
2.2 FABRICATED METAL EQUIPMENT SUPPORT ASSEMBLIES
A. Description: Welded or bolted, structural-steel shapes, shop or field fabricated to fit dimensions of supported equipment.
Reg CC Mtg, June 20, 2023, Page #156
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS 260529
PART 3 EXECUTION
3.1 APPLICATION
A. Comply with NECA 1 and NECA 101 for application of hangers and supports for electrical equipment and systems except if requirements in this Section are stricter.
B. Maximum Support Spacing and Minimum Hanger Rod Size for Raceway: Space supports for EMT, IMC, and RMC as required by scheduled in NECA 1, where its Table 1 lists maximum spacings less than stated in NFPA 70. Minimum rod size shall be 1/4 inch (6 mm) in diameter.
C. Spring-steel clamps designed for supporting single conduits without bolts may be used for 1-1/2- inch (38-mm) and smaller raceways serving branch circuits and communication systems above suspended ceilings and for fastening raceways to trapeze supports.
3.2 SUPPORT INSTALLATION
A. Comply with NECA 1 and NECA 101 for installation requirements except as specified in this Article.
B. Raceway Support Methods: In addition to methods described in NECA 1, EMT, IMC, and RMC may be supported by openings through structure members, as permitted in NFPA 70.
C. Strength of Support Assemblies: Where not indicated, select sizes of components so strength will be adequate to carry present and future static loads within specified loading limits. Minimum static design load used for strength determination shall be weight of supported components plus 200 lb (90 kg).
D. Mounting and Anchorage of Surface-Mounted Equipment and Components: Anchor and fasten electrical items and their supports to building structural elements by the following methods unless otherwise indicated by code:
1. To Wood: Fasten with lag screws or through bolts.
2. To New Concrete: Bolt to concrete inserts.
3. To Masonry: Approved toggle-type bolts on hollow masonry units and expansion anchor fasteners on solid masonry units.
4. To Existing Concrete: Expansion anchor fasteners.
5. Instead of expansion anchors, powder-actuated driven threaded studs provided with lock washers and nuts may be used in existing standard-weight concrete 4 inches (100 mm) thick or greater. Do not use for anchorage to lightweight-aggregate concrete or for slabs less than 4 inches (100 mm) thick.
6. To Steel: Welded threaded studs complying with AWS D1.1/D1.1M, with lock washers and nuts.
7. To Light Steel: Sheet metal screws.
8. Items Mounted on Hollow Walls and Nonstructural Building Surfaces: Mount cabinets, panelboards, disconnect switches, control enclosures, pull and junction boxes, transformers, and other devices on slotted-channel racks attached to substrate by means that meet seismic-restraint strength and anchorage requirements.
Reg CC Mtg, June 20, 2023, Page #157
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS 260529
E. Drill holes for expansion anchors in concrete at locations and to depths that avoid reinforcing bars.
END OF SECTION 260529
Reg CC Mtg, June 20, 2023, Page #158
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 260533
SECTION 260533 RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS PART 1 GENERAL
2.2 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract.
1.2 SUMMARY
A. This Section includes raceways, fittings, boxes, enclosures, and cabinets for electrical wiring.
1.3 DEFINITIONS
A. EMT: Electrical metallic tubing.
B. RMC: Rigid metallic conduit.
1.4 SUBMITTALS
A. Product Data: For surface raceways, wireways and fittings, floor boxes, hinged-cover enclosures, and cabinets.
B. Shop Drawings: For the following raceway components. Include plans, elevations, sections, details, and attachments to other work.
1. Custom enclosures and cabinets.
2. For handholes and boxes for underground wiring, including the following:
a. Duct entry provisions, including locations and duct sizes. b. Frame and cover design.
c. Grounding details.
d. Dimensioned locations of cable rack inserts, and pulling-in and lifting irons. e. Joint details.
C. Samples for Initial Selection: For wireways with factory-applied texture and color finishes.
D. Samples for Verification: For each type of exposed finish required for wireways, prepared on Samples of size indicated below.
E. Coordination Drawings: Conduit routing plans, drawn to scale, on which the following items are shown and coordinated with each other, based on input from installers of the items involved:
1. Structural members in the paths of conduit groups with common supports.
Reg CC Mtg, June 20, 2023, Page #159
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 260533
F. Manufacturer Seismic Qualification Certification: Submit certification that enclosures and cabinets and their mounting provisions, including those for internal components, will withstand seismic forces defined in Division 26 Section "Vibration and Seismic Controls for Electrical Systems." Include the following:
1. Basis for Certification: Indicate whether withstand certification is based on actual test of assembled components or on calculation.
a. The term "withstand" means "the cabinet or enclosure will remain in place without separation of any parts when subjected to the seismic forces specified and the unit will retain its enclosure characteristics, including its interior accessibility, after the seismic event."
2. Dimensioned Outline Drawings of Equipment Unit: Identify center of gravity and locate and describe mounting and anchorage provisions.
3. Detailed description of equipment anchorage devices on which the certification is based and their installation requirements.
G. Qualification Data: For professional engineer and testing agency.
H. Source quality-control test reports.
1.5 QUALITY ASSURANCE
A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use.
B. Comply with NFPA 70.
PART 2 PRODUCTS
2.1 METAL CONDUIT AND TUBING
A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
B. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
1. AFC Cable Systems, Inc.
2. Alflex Inc.
3. Allied Tube & Conduit; a Tyco International Ltd. Co.
4. Anamet Electrical, Inc.; Anaconda Metal Hose.
5. Electri-Flex Co.
6. Manhattan/CDT/Cole-Flex.
7. Maverick Tube Corporation.
8. O-Z Gedney; a unit of General Signal.
Reg CC Mtg, June 20, 2023, Page #160
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 260533
9. Wheatland Tube Company.
C. Rigid Steel Conduit: ANSI C80.1.
D. IMC: ANSI C80.6.
E. EMT: ANSI C80.3.
F. Fittings for Conduit (Including all Types and Flexible and Liquidtight), EMT, and Cable:
NEMA FB 1; listed for type and size raceway with which used, and for application and environment in which installed.
1. Conduit Fittings for Hazardous (Classified) Locations: Comply with UL 886.
2. Coating for Fittings for PVC-Coated Conduit: Minimum thickness, 0.040 inch (1 mm), with overlapping sleeves protecting threaded joints.
G. Joint Compound for Rigid Steel Conduit or IMC: Listed for use in cable connector assemblies, and compounded for use to lubricate and protect threaded raceway joints from corrosion and enhance their conductivity.
2.2 BOXES, ENCLOSURES, AND CABINETS
A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
B. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
1. Cooper Crouse-Hinds; Div. of Cooper Industries, Inc.
2. EGS/Appleton Electric.
3. Erickson Electrical Equipment Company.
4. Hoffman.
5. Hubbell Incorporated; Killark Electric Manufacturing Co. Division.
6. O-Z/Gedney; a unit of General Signal.
7. RACO; a Hubbell Company.
8. Robroy Industries, Inc.; Enclosure Division.
9. Scott Fetzer Co.; Adalet Division.
10. Spring City Electrical Manufacturing Company.
11. Thomas & Betts Corporation.
12. Walker Systems, Inc.; Wiremold Company (The).
13. Woodhead, Daniel Company; Woodhead Industries, Inc. Subsidiary.
2.3 SLEEVES FOR RACEWAYS
A. Steel Pipe Sleeves: ASTM A 53/A 53M, Type E, Grade B, Schedule 40, galvanized steel, plain ends.
B. Cast-Iron Pipe Sleeves: Cast or fabricated "wall pipe," equivalent to ductile-iron pressure pipe, with plain ends and integral waterstop, unless otherwise indicated.
Reg CC Mtg, June 20, 2023, Page #161
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 260533
C. Sleeves for Rectangular Openings: Galvanized sheet steel with minimum 0.052- or 0.138-inch (1.3- or 3.5-mm) thickness as indicated and of length to suit application.
D. Coordinate sleeve selection and application with selection and application of firestopping.
2.4 SLEEVE SEALS
A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
B. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
C. Basis-of-Design Product: Subject to compliance with requirements, provide product by one of the following:
1. Advance Products & Systems, Inc.
2. Calpico, Inc.
3. Metraflex Co.
4. Pipeline Seal and Insulator, Inc.
D. Description: Modular sealing device, designed for field assembly, to fill annular space between sleeve and cable.
1. Sealing Elements: EPDM and NBR interlocking links shaped to fit surface of cable or conduit. Include type and number required for material and size of raceway or cable.
2. Connecting Bolts and Nuts: Carbon steel with corrosion-resistant coating or Stainless steel of length required to secure pressure plates to sealing elements. Include one for each sealing element.
2.5 SOURCE QUALITY CONTROL FOR UNDERGROUND ENCLOSURES
A. Handhole and Pull-Box Prototype Test: Test prototypes of handholes and boxes for compliance with SCTE 77. Strength tests shall be for specified tier ratings of products supplied.
1. Tests of materials shall be performed by a independent testing agency.
2. Strength tests of complete boxes and covers shall be by either an independent testing agency or manufacturer. A qualified registered professional engineer shall certify tests by manufacturer.
3. Testing machine pressure gages shall have current calibration certification complying with ISO 9000 and ISO 10012, and traceable to NIST standards.
PART 3 EXECUTION
Reg CC Mtg, June 20, 2023, Page #162
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 260533
3.1 RACEWAY APPLICATION
A. Outdoors: Apply raceway products as specified below, unless otherwise indicated:
1. Exposed Conduit: Rigid steel conduit.
2. Concealed Conduit, Aboveground: Rigid steel conduit.
3. Boxes and Enclosures, Aboveground: NEMA 250, Type 3R.
B. Comply with the following indoor applications, unless otherwise indicated:
1. Exposed, Not Subject to Physical Damage: Rigid steel conduit.
2. Exposed, Not Subject to Severe Physical Damage: Rigid steel conduit.
3. Exposed and Subject to Severe Physical Damage: Rigid steel conduit.
4. Boxes and Enclosures: NEMA 250, Type 4, stainless steel in damp or wet locations.
C. Minimum Raceway Size: [1/2-inch (16-mm)] [3/4-inch (21-mm)] trade size.
D. Raceway Fittings: Compatible with raceways and suitable for use and location.
1. Rigid and Intermediate Steel Conduit: Use threaded rigid steel conduit fittings, unless otherwise indicated.
2. PVC Externally Coated, Rigid Steel Conduits: Use only fittings listed for use with that material. Patch and seal all joints, nicks, and scrapes in PVC coating after installing conduits and fittings. Use sealant recommended by fitting manufacturer.
E. Install nonferrous conduit or tubing for circuits operating above 60 Hz. Where aluminum raceways are installed for such circuits and pass through concrete, install in nonmetallic sleeve.
F. Do not install aluminum conduits in contact with concrete.
3.2 INSTALLATION
A. Comply with NECA 1 for installation requirements applicable to products specified in Part 2 except where requirements on Drawings or in this Article are stricter.
B. Keep raceways at least 6 inches (150 mm) away from parallel runs of flues and steam or hotwater pipes. Install horizontal raceway runs above water and steam piping.
C. Complete raceway installation before starting conductor installation.
D. Arrange stub-ups so curved portions of bends are not visible above the finished slab.
E. Install no more than the equivalent of three 90-degree bends in any conduit run except for communications conduits, for which fewer bends are allowed.
F. Threaded Conduit Joints, Exposed to Wet, Damp, Corrosive, or Outdoor Conditions: Apply listed compound to threads of raceway and fittings before making up joints. Follow compound manufacturer's written instructions.
Reg CC Mtg, June 20, 2023, Page #163
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 260533
G. Install pull wires in empty raceways. Use polypropylene or monofilament plastic line with not less than 200-lb (90-kg) tensile strength. Leave at least 12 inches (300 mm) of slack at each end of pull wire.
H. Install raceway sealing fittings at suitable, approved, and accessible locations and fill them with listed sealing compound. For concealed raceways, install each fitting in a flush steel box with a blank cover plate having a finish similar to that of adjacent plates or surfaces. Install raceway sealing fittings at the following points:
1. Where conduits pass from warm to cold locations, such as boundaries of refrigerated spaces.
2. Where otherwise required by NFPA 70.
I. Recessed Boxes in Masonry Walls: Saw-cut opening for box in center of cell of masonry block, and install box flush with surface of wall.
J. Set metal floor boxes level and flush with finished floor surface.
K. Set nonmetallic floor boxes level. Trim after installation to fit flush with finished floor surface.
3.3 SLEEVE INSTALLATION FOR ELECTRICAL PENETRATIONS
A. Interior Penetrations of Non-Fire-Rated Walls and Floors: Seal annular space between sleeve and raceway, using joint sealant appropriate for size, depth, and location of joint. Refer to Division 07 Section "Joint Sealants" for materials and installation.
B. Fire-Rated-Assembly Penetrations: Maintain indicated fire rating of walls, partitions, ceilings, and floors at raceway penetrations. Install sleeves and seal with firestop materials. Comply with Division 07 Section "Penetration Firestopping."
C. Roof-Penetration Sleeves: Seal penetration of individual raceways with flexible, boot-type flashing units applied in coordination with roofing work.
D. Aboveground, Exterior-Wall Penetrations: Seal penetrations using sleeves and mechanical sleeve seals. Select sleeve size to allow for 1-inch (25-mm) annular clear space between pipe and sleeve for installing mechanical sleeve seals.
3.4 SLEEVE-SEAL INSTALLATION
A. Install to seal underground, exterior wall penetrations.
B. Use type and number of sealing elements recommended by manufacturer for raceway material and size. Position raceway in center of sleeve. Assemble mechanical sleeve seals and install in annular space between raceway and sleeve. Tighten bolts against pressure plates that cause sealing elements to expand and make watertight seal.
Reg CC Mtg, June 20, 2023, Page #164
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 260533
3.5 FIRESTOPPING
A. Apply firestopping to electrical penetrations of fire-rated floor and wall assemblies to restore original fire-resistance rating of assembly.
3.6 PROTECTION
A. Provide final protection and maintain conditions that ensure coatings, finishes, and cabinets are without damage or deterioration at time of Substantial Completion.
1. Repair damage to galvanized finishes with zinc-rich paint recommended by manufacturer.
2. Repair damage to PVC or paint finishes with matching touchup coating recommended by manufacturer.
END OF SECTION 260533
Reg CC Mtg, June 20, 2023, Page #165
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS 260548 SECTION 260548 VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS PART 1 GENERAL
1.1 SUMMARY
A. This Section includes the following:
1. Hanger rod stiffeners.
2. Anchorage bushings and washers.
1.2 DEFINITIONS
A. The IBC: International Building Code.
B. ICC-ES: ICC-Evaluation Service.
C. OSHPD: Office of Statewide Health Planning and Development for the State of California.
1.3 SUBMITTALS
A. Product Data: For the following:
1. Include rated load, rated deflection, and overload capacity for each vibration isolation device.
2. Illustrate and indicate style, material, strength, fastening provision, and finish for each type and size of seismic-restraint component used.
a. Tabulate types and sizes of seismic restraints, complete with report numbers and rated strength in tension and shear as evaluated by an evaluation service member of ICC-ES, OSHPD, an agency acceptable to authorities having jurisdiction. b. Annotate to indicate application of each product submitted and compliance with requirements.
3. Restrained-Isolation Devices: Include ratings for horizontal, vertical, and combined loads.
B. Delegated-Design Submittal: For vibration isolation and seismic-restraint details indicated to comply with performance requirements and design criteria, including analysis data signed and sealed by the qualified professional engineer responsible for their preparation.
1. Design Calculations: Calculate static and dynamic loading due to equipment weight and operation, seismic forces required to select vibration isolators and seismic restraints. a. Coordinate design calculations with wind-load calculations required for equipment mounted outdoors. Comply with requirements in other Division 26 Sections for equipment mounted outdoors.
Reg CC Mtg, June 20, 2023, Page #166
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS 260548
2. Indicate materials and dimensions and identify hardware, including attachment and anchorage devices.
3. Field-fabricated supports.
4. Seismic-Restraint Details:
a. Design Analysis: To support selection and arrangement of seismic restraints.
Include calculations of combined tensile and shear loads. b. Details: Indicate fabrication and arrangement. Detail attachments of restraints to the restrained items and to the structure. Show attachment locations, methods, and spacings. Identify components, list their strengths, and indicate directions and values of forces transmitted to the structure during seismic events. Indicate association with vibration isolation devices.
c. Preapproval and Evaluation Documentation: By an evaluation service member of ICC-ES, OSHPD, an agency acceptable to authorities having jurisdiction, showing maximum ratings of restraint items and the basis for approval (tests or calculations).
C. Coordination Drawings: Show coordination of seismic bracing for electrical components with other systems and equipment in the vicinity, including other supports and seismic restraints.
D. Welding certificates.
E. Qualification Data: For professional engineer and testing agency.
F. Field quality-control test reports.
1.4 QUALITY ASSURANCE
A. Testing Agency Qualifications: An independent agency, with the experience and capability to conduct the testing indicated, that is a nationally recognized testing laboratory (NRTL) as defined by OSHA in 29 CFR 1910.7, and that is acceptable to authorities having jurisdiction.
B. Comply with seismic-restraint requirements in the IBC unless requirements in this Section are more stringent.
C. Welding: Qualify procedures and personnel according to AWS D1.1/D1.1M, "Structural Welding Code - Steel."
D. Seismic-restraint devices shall have horizontal and vertical load testing and analysis and shall bear anchorage preapproval OPA number from OSHPD, preapproval by ICC-ES, or preapproval by another agency acceptable to authorities having jurisdiction, showing maximum seismicrestraint ratings. Ratings based on independent testing are preferred to ratings based on calculations. If preapproved ratings are not available, submittals based on independent testing are preferred. Calculations (including combining shear and tensile loads) to support seismicrestraint designs must be signed and sealed by a qualified professional engineer.
E. Comply with NFPA 70.
PART 2 PRODUCTS
Reg CC Mtg, June 20, 2023, Page #167
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS 260548
2.1 VIBRATION ISOLATORS
A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
B. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
C. Basis-of-Design Product: Subject to compliance with requirements, provide product by one of the following:
1. Ace Mountings Co., Inc.
2. Amber/Booth Company, Inc.
3. California Dynamics Corporation.
4. Isolation Technology, Inc.
5. Kinetics Noise Control.
6. Mason Industries.
7. Vibration Eliminator Co., Inc.
8. Vibration Isolation.
9. Vibration Mountings & Controls, Inc.
D. Pads: Arrange in single or multiple layers of sufficient stiffness for uniform loading over pad area, molded with a nonslip pattern and galvanized-steel baseplates, and factory cut to sizes that match requirements of supported equipment.
1. Resilient Material: Oil- and water-resistant.
2.2 SEISMIC-RESTRAINT DEVICES
A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
B. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
C. Basis-of-Design Product: Subject to compliance with requirements, provide product by one of the following:
1. Amber/Booth Company, Inc.
2. California Dynamics Corporation.
3. Cooper B-Line, Inc.; a division of Cooper Industries.
4. Hilti Inc.
5. Loos & Co.; Seismic Earthquake Division.
6. Mason Industries.
7. TOLCO Incorporated; a brand of NIBCO INC.
8. Unistrut; Tyco International, Ltd.
D. General Requirements for Restraint Components: Rated strengths, features, and application requirements shall be as defined in reports by an evaluation service member of ICC-ES, OSHPD, or an agency acceptable to authorities having jurisdiction.
Reg CC Mtg, June 20, 2023, Page #168
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS 260548
1. Structural Safety Factor: Allowable strength in tension, shear, and pullout force of components shall be at least four times the maximum seismic forces to which they will be subjected.
E. Bushings for Floor-Mounted Equipment Anchor: Neoprene bushings designed for rigid equipment mountings, and matched to type and size of anchors and studs.
F. Bushing Assemblies for Wall-Mounted Equipment Anchorage: Assemblies of neoprene elements and steel sleeves designed for rigid equipment mountings, and matched to type and size of attachment devices.
G. Resilient Isolation Washers and Bushings: One-piece, molded, oil- and water-resistant neoprene, with a flat washer face.
H. Mechanical Anchor: Drilled-in and stud-wedge or female-wedge type in zinc-coated steel for interior applications and stainless steel for exterior applications. Select anchors with strength required for anchor and as tested according to ASTM E 488. Minimum length of eight times diameter.
I. Adhesive Anchor: Drilled-in and capsule anchor system containing polyvinyl or urethane methacrylate-based resin and accelerator, or injected polymer or hybrid mortar adhesive. Provide anchor bolts and hardware with zinc-coated steel for interior applications and stainless steel for exterior applications. Select anchor bolts with strength required for anchor and as tested according to ASTM E 488.
2.3 FACTORY FINISHES
A. Finish: Manufacturer's standard prime-coat finish ready for field painting.
B. Finish: Manufacturer's standard paint applied to factory-assembled and -tested equipment before shipping.
1. Powder coating on springs and housings.
2. All hardware shall be galvanized. Hot-dip galvanize metal components for exterior use.
3. Baked enamel or powder coat for metal components on isolators for interior use.
4. Color-code or otherwise mark vibration isolation and seismic-control devices to indicate capacity range.
PART 3 EXECUTION
Reg CC Mtg, June 20, 2023, Page #169
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS 260548
3.1 EXAMINATION
A. Examine areas and equipment to receive vibration isolation and seismic-control devices for compliance with requirements for installation tolerances and other conditions affecting performance.
B. Examine roughing-in of reinforcement and cast-in-place anchors to verify actual locations before installation.
C. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 APPLICATIONS
A. Multiple Raceways or Cables: Secure raceways and cables to trapeze member with clamps approved for application by an evaluation service member of ICC-ES, OSHPD and an agency acceptable to authorities having jurisdiction.
B. Hanger Rod Stiffeners: Install hanger rod stiffeners where indicated or scheduled on Drawings to receive them and where required to prevent buckling of hanger rods due to seismic forces.
C. Strength of Support and Seismic-Restraint Assemblies: Where not indicated, select sizes of components so strength will be adequate to carry present and future static and seismic loads within specified loading limits.
3.3 SEISMIC-RESTRAINT DEVICE INSTALLATION
A. Equipment and Hanger Restraints:
1. Install restrained isolators on electrical equipment.
2. Install resilient, bolt-isolation washers on equipment anchor bolts where clearance between anchor and adjacent surface exceeds 0.125 inch (3.2 mm).
3. Install seismic-restraint devices using methods approved by an evaluation service member of ICC-ES, OSHPD and an agency acceptable to authorities having jurisdiction providing required submittals for component.
B. Install bushing assemblies for mounting bolts for wall-mounted equipment, arranged to provide resilient media where equipment or equipment-mounting channels are attached to wall.
C. Attachment to Structure: If specific attachment is not indicated, anchor bracing to structure at flanges of beams, at upper truss chords of bar joists, or at concrete members.
D. Drilled-in Anchors:
1. Identify position of reinforcing steel and other embedded items prior to drilling holes for anchors. Do not damage existing reinforcing or embedded items during coring or drilling.
Notify the structural engineer if reinforcing steel or other embedded items are encountered during drilling. Locate and avoid prestressed tendons, electrical and telecommunications conduit, and gas lines.
Reg CC Mtg, June 20, 2023, Page #170
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS 260548
2. Do not drill holes in concrete or masonry until concrete, mortar, or grout has achieved full design strength.
3. Wedge Anchors: Protect threads from damage during anchor installation. Heavy-duty sleeve anchors shall be installed with sleeve fully engaged in the structural element to which anchor is to be fastened.
4. Adhesive Anchors: Clean holes to remove loose material and drilling dust prior to installation of adhesive. Place adhesive in holes proceeding from the bottom of the hole and progressing toward the surface in such a manner as to avoid introduction of air pockets in the adhesive.
5. Set anchors to manufacturer's recommended torque, using a torque wrench.
6. Install zinc-coated steel anchors for interior and stainless-steel anchors for exterior applications.
3.4 ACCOMMODATION OF DIFFERENTIAL SEISMIC MOTION
A. Install flexible connections in runs of raceways, cables, wireways, cable trays, and busways where they cross seismic joints, where adjacent sections or branches are supported by different structural elements, and where they terminate with connection to equipment that is anchored to a different structural element from the one supporting them as they approach equipment.
3.5 FIELD QUALITY CONTROL
A. Testing Agency: Engage a qualified testing agency to perform tests and inspections and prepare test reports.
B. Perform tests and inspections.
C. Tests and Inspections:
1. Provide evidence of recent calibration of test equipment by a testing agency acceptable to authorities having jurisdiction.
2. Schedule test with Owner, through Architect, before connecting anchorage device to restrained component (unless postconnection testing has been approved), and with at least seven days' advance notice.
3. Obtain Architect's approval before transmitting test loads to structure. Provide temporary load-spreading members.
4. Test at least four of each type and size of installed anchors and fasteners selected by Architect.
5. Test to 90 percent of rated proof load of device.
6. Measure isolator restraint clearance.
7. Measure isolator deflection.
8. Verify snubber minimum clearances.
9. If a device fails test, modify all installations of same type and retest until satisfactory results are achieved.
D. Remove and replace malfunctioning units and retest as specified above.
E. Prepare test and inspection reports.
Reg CC Mtg, June 20, 2023, Page #171
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS 260548
3.6 ADJUSTING
A. Adjust isolators after isolated equipment is at operating weight.
B. Adjust limit stops on restrained spring isolators to mount equipment at normal operating height.
After equipment installation is complete, adjust limit stops so they are out of contact during normal operation.
C. Adjust active height of spring isolators.
D. Adjust restraints to permit free movement of equipment within normal mode of operation.
END OF SECTION 260548
Reg CC Mtg, June 20, 2023, Page #172
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
IDENTIFICATION FOR ELECTRICAL SYSTEMS 260533
SECTION 260553 IDENTIFICATION FOR ELECTRICAL SYSTEMS
PART 1 GENERAL
1.1 RELATED DOCUMENTS
E. Drawings and general provisions of the Contract.
1.2 SUMMARY
A. Section Includes:
1. Identification for raceways.
2. Identification of power and control cables.
3. Identification for conductors.
4. Warning labels and signs.
5. Instruction signs.
6. Equipment identification labels.
7. Miscellaneous identification products.
1.3 SUBMITTALS
A. Product Data: For each electrical identification product indicated.
B. Samples: For each type of label and sign to illustrate size, colors, lettering style, mounting provisions, and graphic features of identification products.
C. Identification Schedule: An index of nomenclature of electrical equipment and system components used in identification signs and labels.
1.4 QUALITY ASSURANCE
A. Comply with ANSI A13.1 and IEEE C2.
B. Comply with NFPA 70.
C. Comply with 29 CFR 1910.144 and 29 CFR 1910.145.
D. Comply with ANSI Z535.4 for safety signs and labels.
E. Adhesive-attached labeling materials, including label stocks, laminating adhesives, and inks used by label printers, shall comply with UL 969.
Reg CC Mtg, June 20, 2023, Page #173
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
IDENTIFICATION FOR ELECTRICAL SYSTEMS 260533
1.5 COORDINATION
A. Coordinate identification names, abbreviations, colors, and other features with requirements in other Sections requiring identification applications, Drawings, Shop Drawings, manufacturer's wiring diagrams, and the Operation and Maintenance Manual; and with those required by codes, standards, and 29 CFR 1910.145. Use consistent designations throughout Project.
B. Coordinate installation of identifying devices with completion of covering and painting of surfaces where devices are to be applied.
C. Coordinate installation of identifying devices with location of access panels and doors.
D. Install identifying devices before installing acoustical ceilings and similar concealment.
PART 2 PRODUCTS
2.1 POWER RACEWAY IDENTIFICATION MATERIALS
A. Comply with ANSI A13.1 for minimum size of letters for legend and for minimum length of color field for each raceway size.
B. Colors for Raceways Carrying Circuits at 600 V or Less:
1. Black letters on an orange field.
2. Legend: Indicate voltage and system or service type.
C. Colors for Raceways Carrying Circuits at More Than 600 V:
1. Black letters on an orange field.
2. Legend: "DANGER CONCEALED HIGH VOLTAGE WIRING" with 3-inch- (75-mm-) high letters on 20-inch (500-mm) centers.
D. Self-Adhesive Vinyl Labels for Raceways Carrying Circuits at 600 V or Less: Preprinted, flexible label laminated with a clear, weather- and chemical-resistant coating and matching wraparound adhesive tape for securing ends of legend label.
E. Snap-Around Labels for Raceways Carrying Circuits at 600 V or Less: Slit, pretensioned, flexible, preprinted, color-coded acrylic sleeve, with diameter sized to suit diameter of raceway or cable it identifies and to stay in place by gripping action.
F. Snap-Around, Color-Coding Bands for Raceways Carrying Circuits at 600 V or Less: Slit, pretensioned, flexible, solid-colored acrylic sleeve, 2 inches (50 mm) long, with diameter sized to suit diameter of raceway or cable it identifies and to stay in place by gripping action.
G. Tape and Stencil for Raceways Carrying Circuits More Than 600 V: 4-inch- (100-mm-) wide black stripes on 10-inch (250-mm) centers diagonally over orange background that extends full length of raceway or duct and is 12 inches (300 mm) wide. Stop stripes at legends.
Reg CC Mtg, June 20, 2023, Page #174
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
IDENTIFICATION FOR ELECTRICAL SYSTEMS 260533
H. Metal Tags: Brass or aluminum, 2 by 2 by 0.05 inch (50 by 50 by 1.3 mm), with stamped legend, punched for use with self-locking cable tie fastener.
I. Write-On Tags: Polyester tag, 0.010 inch (0.25 mm) thick, with corrosion-resistant grommet and cable tie for attachment to conductor or cable.
1. Marker for Tags: Permanent, waterproof, black ink marker recommended by tag manufacturer.
2. Marker for Tags: Machine-printed, permanent, waterproof, black ink marker recommended by printer manufacturer.
2.2 POWER AND CONTROL CABLE IDENTIFICATION MATERIALS
A. Comply with ANSI A13.1 for minimum size of letters for legend and for minimum length of color field for each raceway and cable size.
B. Self-Adhesive Vinyl Labels: Preprinted, flexible label laminated with a clear, weather- and chemical-resistant coating and matching wraparound adhesive tape for securing ends of legend label.
C. Metal Tags: Brass or aluminum, 2 by 2 by 0.05 inch (50 by 50 by 1.3 mm), with stamped legend, punched for use with self-locking cable tie fastener.
D. Write-On Tags: Polyester tag, 0.010 inch (0.25 mm) thick, with corrosion-resistant grommet and cable tie for attachment to conductor or cable.
1. Marker for Tags: Permanent, waterproof, black ink marker recommended by tag manufacturer.
2. Marker for Tags: Machine-printed, permanent, waterproof, black ink marker recommended by printer manufacturer.
E. Snap-Around Labels: Slit, pretensioned, flexible, preprinted, color-coded acrylic sleeve, with diameter sized to suit diameter of raceway or cable it identifies and to stay in place by gripping action.
F. Snap-Around, Color-Coding Bands: Slit, pretensioned, flexible, solid-colored acrylic sleeve, 2 inches (50 mm) long, with diameter sized to suit diameter of raceway or cable it identifies and to stay in place by gripping action.
2.3 CONDUCTOR IDENTIFICATION MATERIALS
A. Color-Coding Conductor Tape: Colored, self-adhesive vinyl tape not less than 3 mils (0.08 mm) thick by 1 to 2 inches (25 to 50 mm) wide.
B. Self-Adhesive Vinyl Labels: Preprinted, flexible label laminated with a clear, weather- and chemical-resistant coating and matching wraparound adhesive tape for securing ends of legend label.
Reg CC Mtg, June 20, 2023, Page #175
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
IDENTIFICATION FOR ELECTRICAL SYSTEMS 260533
C. Snap-Around Labels: Slit, pretensioned, flexible, preprinted, color-coded acrylic sleeve, with diameter sized to suit diameter of raceway or cable it identifies and to stay in place by gripping action.
D. Snap-Around, Color-Coding Bands: Slit, pretensioned, flexible, solid-colored acrylic sleeve, 2 inches (50 mm) long, with diameter sized to suit diameter of raceway or cable it identifies and to stay in place by gripping action.
E. Marker Tapes: Vinyl or vinyl-cloth, self-adhesive wraparound type, with circuit identification legend machine printed by thermal transfer or equivalent process.
F. Write-On Tags: Polyester tag, 0.010 inch (0.25 mm) thick, with corrosion-resistant grommet and cable tie for attachment to conductor or cable.
1. Marker for Tags: Permanent, waterproof, black ink marker recommended by tag manufacturer.
2. Marker for Tags: Machine-printed, permanent, waterproof, black ink marker recommended by printer manufacturer.
2.4 FLOOR MARKING TAPE
G. 2-inch- (50-mm-) wide, 5-mil (0.125-mm) pressure-sensitive vinyl tape, with black and white stripes and clear vinyl overlay.
2.5 WARNING LABELS AND SIGNS
H. Comply with NFPA 70 and 29 CFR 1910.145.
I. Self-Adhesive Warning Labels: Factory-printed, multicolor, pressure-sensitive adhesive labels, configured for display on front cover, door, or other access to equipment unless otherwise indicated.
J. Baked-Enamel Warning Signs:
1. Preprinted aluminum signs, punched or drilled for fasteners, with colors, legend, and size required for application.
2. 1/4-inch (6.4-mm) grommets in corners for mounting.
3. Nominal size, 7 by 10 inches (180 by 250 mm).
K. Metal-Backed, Butyrate Warning Signs:
1. Weather-resistant, nonfading, preprinted, cellulose-acetate butyrate signs with 0.0396-inch (1-mm) galvanized-steel backing; and with colors, legend, and size required for application.
2. 1/4-inch (6.4-mm) grommets in corners for mounting.
3. Nominal size, 10 by 14 inches (250 by 360 mm).
L. Warning label and sign shall include, but are not limited to, the following legends:
Reg CC Mtg, June 20, 2023, Page #176
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
IDENTIFICATION FOR ELECTRICAL SYSTEMS 260533
1. Multiple Power Source Warning: "DANGER - ELECTRICAL SHOCK HAZARD - EQUIPMENT HAS MULTIPLE POWER SOURCES."
2. Workspace Clearance Warning: "WARNING - OSHA REGULATION - AREA IN FRONT OF ELECTRICAL EQUIPMENT MUST BE KEPT CLEAR FOR 36 INCHES (915 MM)."
2.6 INSTRUCTION SIGNS
A. Engraved, laminated acrylic or melamine plastic, minimum 1/16 inch (1.6 mm) thick for signs up to 20 sq. inches (129 sq. cm) and 1/8 inch (3.2 mm) thick for larger sizes.
1. Engraved legend with black letters on white face.
2. Punched or drilled for mechanical fasteners.
3. Framed with mitered acrylic molding and arranged for attachment at applicable equipment.
B. Adhesive Film Label: Machine printed, in black, by thermal transfer or equivalent process.
Minimum letter height shall be 3/8 inch (10 mm).
C. Adhesive Film Label with Clear Protective Overlay: Machine printed, in black, by thermal transfer or equivalent process. Minimum letter height shall be 3/8 inch (10 mm). Overlay shall provide a weatherproof and UV-resistant seal for label.
2.7 EQUIPMENT IDENTIFICATION LABELS
A. Adhesive Film Label: Machine printed, in black, by thermal transfer or equivalent process.
Minimum letter height shall be 3/8 inch (10 mm).
B. Adhesive Film Label with Clear Protective Overlay: Machine printed, in black, by thermal transfer or equivalent process. Minimum letter height shall be 3/8 inch (10 mm). Overlay shall provide a weatherproof and UV-resistant seal for label.
C. Self-Adhesive, Engraved, Laminated Acrylic or Melamine Label: Adhesive backed, with white letters on a dark-gray background. Minimum letter height shall be 3/8 inch (10 mm).
D. Engraved, Laminated Acrylic or Melamine Label: Punched or drilled for screw mounting. White letters on a dark-gray background. Minimum letter height shall be 3/8 inch (10 mm).
E. Stenciled Legend: In nonfading, waterproof, black ink or paint. Minimum letter height shall be 1 inch (25 mm).
2.8 CABLE TIES
A. General-Purpose Cable Ties: Fungus inert, self extinguishing, one piece, self locking, Type 6/6 nylon.
1. Minimum Width: 3/16 inch (5 mm).
2. Tensile Strength at 73 deg F (23 deg C), According to ASTM D 638: 12,000 psi (82.7 MPa).
Reg CC Mtg, June 20, 2023, Page #177
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
IDENTIFICATION FOR ELECTRICAL SYSTEMS 260533
3. Temperature Range: Minus 40 to plus 185 deg F (Minus 40 to plus 85 deg C).
4. Color: Black except where used for color-coding.
B. UV-Stabilized Cable Ties: Fungus inert, designed for continuous exposure to exterior sunlight, self extinguishing, one piece, self locking, Type 6/6 nylon.
1. Minimum Width: 3/16 inch (5 mm).
2. Tensile Strength at 73 deg F (23 deg C), According to ASTM D 638: 12,000 psi (82.7 MPa).
3. Temperature Range: Minus 40 to plus 185 deg F (Minus 40 to plus 85 deg C).
4. Color: Black.
C. Plenum-Rated Cable Ties: Self extinguishing, UV stabilized, one piece, self locking.
1. Minimum Width: 3/16 inch (5 mm).
2. Tensile Strength at 73 deg F (23 deg C), According to ASTM D 638: 7000 psi (48.2 MPa).
3. UL 94 Flame Rating: 94V-0.
4. Temperature Range: Minus 50 to plus 284 deg F (Minus 46 to plus 140 deg C).
5. Color: Black.
2.9 MISCELLANEOUS IDENTIFICATION PRODUCTS
A. Paint: Select paint system applicable for surface material and location (exterior or interior).
B. Fasteners for Labels and Signs: Self-tapping, stainless-steel screws or stainless-steel machine screws with nuts and flat and lock washers.
PART 3 EXECUTION
3.1 INSTALLATION
A. Verify identity of each item before installing identification products.
B. Location: Install identification materials and devices at locations for most convenient viewing without interference with operation and maintenance of equipment.
C. Apply identification devices to surfaces that require finish after completing finish work.
D. Self-Adhesive Identification Products: Clean surfaces before application, using materials and methods recommended by manufacturer of identification device.
E. Attach signs and plastic labels that are not self-adhesive type with mechanical fasteners appropriate to the location and substrate.
F. System Identification Color-Coding Bands for Raceways and Cables: Each color-coding band shall completely encircle cable or conduit. Place adjacent bands of two-color markings in contact, side by side. Locate bands at changes in direction, at penetrations of walls and floors, at 50-foot Reg CC Mtg, June 20, 2023, Page #178
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
IDENTIFICATION FOR ELECTRICAL SYSTEMS 260533
(15-m) maximum intervals in straight runs, and at 25-foot (7.6-m) maximum intervals in congested areas.
G. Aluminum Wraparound Marker Labels and Metal Tags: Secure tight to surface of conductor or cable at a location with high visibility and accessibility.
H. Cable Ties: For attaching tags. Use general-purpose type, except as listed below:
1. Outdoors: UV-stabilized nylon.
2. In Spaces Handling Environmental Air: Plenum rated.
I. Painted Identification: Comply with requirements in Division 09 painting Sections for surface preparation and paint application.
3.2 IDENTIFICATION SCHEDULE
A. Accessible Raceways and Cables within Buildings: Identify the covers of each junction and pull box of the following systems with self-adhesive vinyl labels with the wiring system legend and system voltage. System legends shall be as follows:
1. Emergency Power.
2. Power.
3. UPS.
B. Power-Circuit Conductor Identification, 600 V or Less: For conductors in vaults, pull and junction boxes, manholes, and handholes, use color-coding conductor tape to identify the phase.
1. Color-Coding for Phase and Voltage Level Identification, 600 V or Less: Use colors listed below for feeder and branch-circuit conductors.
a. Color shall be factory applied or field applied for sizes larger than No. 8 AWG, if authorities having jurisdiction permit.
b. Colors for 208/120-V Circuits:
1) Phase A: Black.
2) Phase B: Red.
3) Phase C: Blue.
c. Field-Applied, Color-Coding Conductor Tape: Apply in half-lapped turns for a minimum distance of 6 inches (150 mm) from terminal points and in boxes where splices or taps are made. Apply last two turns of tape with no tension to prevent possible unwinding. Locate bands to avoid obscuring factory cable markings.
C. Install instructional sign including the color-code for grounded and ungrounded conductors using adhesive-film-type labels.
D. Conductors to Be Extended in the Future: Attach write-on tags or marker tape to conductors and list source.
Reg CC Mtg, June 20, 2023, Page #179
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
IDENTIFICATION FOR ELECTRICAL SYSTEMS 260533
E. Auxiliary Electrical Systems Conductor Identification: Identify field-installed alarm, control, and signal connections.
1. Identify conductors, cables, and terminals in enclosures and at junctions, terminals, and pull points. Identify by system and circuit designation.
2. Use system of marker tape designations that is uniform and consistent with system used by manufacturer for factory-installed connections.
3. Coordinate identification with Project Drawings, manufacturer's wiring diagrams, and the Operation and Maintenance Manual.
F. Workspace Indication: Install floor marking tape to show working clearances in the direction of access to live parts. Workspace shall be as required by NFPA 70 and 29 CFR 1926.403 unless otherwise indicated. Do not install at flush-mounted panelboards and similar equipment in finished spaces.
G. Operating Instruction Signs: Install instruction signs to facilitate proper operation and maintenance of electrical systems and items to which they connect. Install instruction signs with approved legend where instructions are needed for system or equipment operation.
H. Emergency Operating Instruction Signs: Install instruction signs with white legend on a red background with minimum 3/8-inch- (10-mm-) high letters for emergency instructions at equipment used for power transfer.
I. Equipment Identification Labels: On each unit of equipment, install unique designation label that is consistent with wiring diagrams, schedules, and the Operation and Maintenance Manual.
Apply labels to disconnect switches and protection equipment, central or master units, control panels, control stations, terminal cabinets, and racks of each system. Systems include power, lighting, control, communication, signal, monitoring, and alarm systems unless equipment is provided with its own identification.
1. Labeling Instructions:
a. Outdoor Equipment: Engraved, laminated acrylic or melamine label. b. Elevated Components: Increase sizes of labels and letters to those appropriate for viewing from the floor.
c. Unless provided with self-adhesive means of attachment, fasten labels with appropriate mechanical fasteners that do not change the NEMA or NRTL rating of the enclosure.
2. Equipment to Be Labeled:
a. Panelboards: Typewritten directory of circuits in the location provided by panelboard manufacturer. Panelboard identification shall be self-adhesive, engraved, laminated acrylic or melamine label.
b. Enclosures and electrical cabinets.
c. Emergency system boxes and enclosures.
d. Enclosed switches.
e. Enclosed circuit breakers.
f. Push-button stations.
g. Power transfer equipment.
h. Contactors.
i. Remote-controlled switches, dimmer modules, and control devices.
Reg CC Mtg, June 20, 2023, Page #180
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
IDENTIFICATION FOR ELECTRICAL SYSTEMS 260533
j. Battery-inverter units.
k. Battery racks.
l. Power-generating units.
m. Monitoring and control equipment.
END OF SECTION 260553
Reg CC Mtg, June 20, 2023, Page #181
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
ENGINE GENERATORS 263213
SECTION 263213.13 DIESEL-ENGINE-DRIVEN GENERATOR SETS
PART 1. - GENERAL
1.1. RELATED DOCUMENTS
Electrical Drawing Set
1.2. SUMMARY
A. This Section includes packaged engine-generator sets for standby power supply with the following features:
1. Diesel engine
2. Unit-mounted cooling system
3. Unit-mounted and remote-mounted control and monitoring
4. Fuel system
5. Outdoor enclosure
1.3. DEFINITIONS
EPS: Emergency power supply.
EPSS: Emergency power supply system.
NECA/EGSA: National Electrical Contractors Associations/Electrical Generating Systems Association NETA: International Electrical Testing Association.
NRTL: Nationally Recognized Testing Laboratory
Optional Standby Power Supply: NEC Article 702, optional standby.
1.4. QUALITY ASSURANCE
A. Installer Qualifications: Manufacturer's authorized representative who is trained and approved for installation of units required for this Project.
B. Manufacturer Qualifications: A qualified manufacturer. Maintain, within 200 miles of Project site, a service center capable of providing training, parts, and emergency maintenance repairs.
Reg CC Mtg, June 20, 2023, Page #182
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
ENGINE GENERATORS 263213
C. Testing Agency Qualifications: Agency, with the experience and capability to conduct the testing indicated, that is a member company of the InterNational Electrical Testing Association or is a nationally recognized testing laboratory (NRTL), and that is acceptable to authorities having jurisdiction.
1. Testing Agency's Field Supervisor: Person currently certified by the InterNational Electrical Testing Association or the National Institute for Certification in Engineering Technologies to supervise on-site testing.
D. Source Limitations: Obtain packaged generator sets and auxiliary components through one source from a single manufacturer.
E. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use.
F. Electrical Code Compliance: Comply with applicable local code requirements of the authority having jurisdiction and NEC 702 (Optional Standby Systems) pertaining to construction and installation of emergency and standby systems.
G. NFPA Compliance: Comply with applicable requirements of NFPA 37, “Installation and Use of Stationary Combustion Engines and Gas Turbines,” NFPA 110, “Standard for Emergency and Standby Power Systems”.
H. UL Compliance: Comply with applicable requirements of UL 2200, " Standard for Stationary Engine Generator Assemblies”, and UL 142, “Standard for Steel Above-Ground Tanks for Flammable and Combustible Liquids.”
I. ANSI/NEMA Compliance: Comply with applicable requirements of, "Motors and Generators", S1.13-1971 “Measurement of Sound Pressure Levels in Air”.
J. NEMA Compliance: Comply with applicable requirements of NEMA 250, "Enclosures for Electrical Equipment (1000 Volts Maximum)" and NEMA MG 2, "Safety Standard for Construction and Guide for Selection, Installation, and Use of Electric Motors and Generators." K. IEEE Compliance: Comply with applicable portions of IEEE Standard 446, "IEEE Recommended Practice for Emergency and Standby Power Systems for Industrial and Commercial Applications" (Orange Book).
1.5. SUBMITTALS
The following table outlines the required technical submittals for compliance with this specification.
These submittals are defined in specification section 260500. This does not relieve the manufacturer from supplying any additional documentation as specified by the applicable codes and standards, other submittal requirements as indicated in attached specifications, or those indicated by the Construction Manager.
Reg CC Mtg, June 20, 2023, Page #183
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
ENGINE GENERATORS 263213
SUBMITTALS Schedule
Submittal Item
With BidApproval
Submittals
Prior to Equipment Project Closeout
Manufacturer's Qualifications X
Certification of Compliance X X
Maintenance Materials List X X
Vendor Contract Information X
Schedule X
Purchase Order X
Bill of Materials X X
Product Data X X
General Arrangement Drawings X X
Equipment Shop Drawings X
Calculations X
Factory Test Procedures X
Field Test Procedures X
Shipping and Assembly Drawings X
Certified Factory Test Reports X
Certified Field Test Reports X
Operation and Maintenance Data/Manuals X
Closeout Submittals X
Submit the following with Bid for approval:
A. Manufacturer’s Qualifications: Indicate compliance with requirements listed under Quality Assurance.
B. Certification of Compliance: Indicate certification of compliance with Specification. Clearly state deviations and clarifications. Provide itemized list of all paragraphs and subparagraphs of this specification section indicating “Comply”, “Not Comply”, or “Deviation”. Itemize each exception and provide specific reference to specification.
C. Maintenance Materials List: Furnish list of extra materials that match products installed.
D. Vendor Contract with equipment manufacturer.
E. Estimated time to deliver equipment on site, including:
• Time from bid award to shop drawing approval submittals • Time from approved shop drawings to delivery at Project Site Reg CC Mtg, June 20, 2023, Page #184
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
ENGINE GENERATORS 263213
F. Bill of Materials: Vendor’s material quotation of all equipment and accessories being provided.
G. Product Data: Include rated capacities, operating characteristics, electrical characteristics, and furnished specialties and accessories. Include model number for auxiliary equipment, including heaters, batteries, battery chargers, silencers, circuit breakers, engine controllers, engine speed control system, voltage regulators, alternators, excitation modules, input/output modules, relays, jacket coolant heaters. Provide data sheets for:
1. Thermal damage curve for generator
2. Generator protective device and trip unit
3. Time-current characteristic curves for generator protective device
4. Sound (noise) data (overall and frequency) for exhaust and mechanical output at specified rating and emissions data
5. Protective enclosure: Include materials of construction, UL listing, color, and IBC wind loading certification, seismic certifications
6. Protective enclosure sound pressure level ratings for selected generator model. Indicate dB(A) levels at 7 meters (23 feet) at 100% load.
7. Silencer: Include dB(A) level sound reduction and EGSA class number ratings H. Generator Characteristics: Include generator characteristics, including, but not limited to kW, kVA rating, efficiency, and short-circuit current capability. Include tabulations of the following:
1. Fuel consumption in gallons per hour at 0.8 power factor at 0.5, 0.75 and 1.0 times generator capacity.
2. Air flow requirements for cooling and combustion air in cfm at 0.8 power factor, with air supply temperature of 95, 80, 70, and 50 deg F. Provide drawings showing requirements and limitations for location of air intake and exhausts.
I. General Arrangement Drawings: General arrangement drawings, front view elevation drawings, dimensioned outline drawings, and weights.
J. Equipment Shop Drawings: Submit complete dimensional layout information of engine, generator, vibration isolation devices, exhaust silencer, piping, fluid drain ports, and radiator, wiring of components, and installation drawings showing Owner interface points. Include wiring diagrams showing terminal blocks for field connections to alarm and control circuitry.
1. Enclosure: Drawings shall include enclosure layout to include generator control panel, lighting, panelboard, receptacles, generator circuit breaker location, battery rack, battery charger location, lifting provisions and rigging instructions. Include plans and elevations for enclosure and required clearances for door swings and maintenance access.
2. Fuel Tank: Integral to track mounted generator set. Drawings shall include tank information.
Indicate tank nominal and usable capacities in gallons, tank UL rating, secondary containment provisions, and dry weight.
K. Alternator Characteristics: Provide tabulation of following reactances:
1. Sub-transient reactance - X"d
2. Transient reactance - X'd
3. Synchronous reactance - Xd
Reg CC Mtg, June 20, 2023, Page #185
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
ENGINE GENERATORS 263213
4. Zero sequence reactance - Xo
5. Negative sequence reactance - X2
L. Calculations:
1. Prototype torsional analysis to ensure compatibility between the engine and generator provided
2. Battery and battery charger sizing calculations
M. Manufacturer Seismic Qualification Certification: Submit certification that the tank, enginegenerator set, batteries, battery racks, accessories, and components will withstand seismic forces and provide necessary components to comply with seismic requirements in Bay Area, California.
Include the following:
1. Basis for Certification: Indicate whether withstand certification is based on actual test of assembled components or on calculation. The term "withstand" means "the unit will remain in place without separation of any parts from the device when subjected to the seismic forces specified.
2. Dimensioned Outline Drawings of Equipment Unit: Identify center of gravity and locate and describe mounting and anchorage provisions.
3. Detailed description of equipment anchorage devices on which the certification is based and their installation requirements.
N. Certificate of Emissions Conformance: Certified report of exhaust emissions showing compliance with applicable federal, state and local regulations.
O. Quality Control Procedures:
1. Factory Test Procedures
2. Field Test Procedures
P. Warranty: Manufacturer’s warranty for engine-generator and all associated accessories to indicate warranty period, Manufacturer’s and Owner’s responsibilities, and limitations. Submit the following prior to equipment shipment from factory to project location.
Q. Certifications: Certified Factory Test Report shall record the following parameters during final production testing:
1. Single-step load pickup
2. Transient and steady-state governing
3. Safety shutdown device testing
4. Voltage regulation
5. Rated power
6. Maximum power
R. Certified Field Test Reports.
Submit the following as part of Project Closeout.
1. Closeout Submittals
I. Operation and Maintenance Data: The manufacturer shall provide two bound copies and one electronic copy of all service and maintenance manuals which shall include all Reg CC Mtg, June 20, 2023, Page #186
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
ENGINE GENERATORS 263213
approved shop drawings, piping diagrams, wiring diagrams as specified in this section, plus descriptive literature, parts list and recommended maintenance procedures and schedules for the engine-generator system. Manuals shall be turned over to Owner's Representative at the time of instructing the Representative in the operation and care of the system. Include a list of tools and replacement items recommended to be stored at Project for ready access. Include part and drawing numbers, current unit prices, and source of supply.
2. Manuals shall be divided into the following distinct sections:
I. General description
II. Operating instructions
III. Routine maintenance (parts, schedules, tests)
IV. Troubleshooting (step-by-step chart format)
V. Data (bill of materials, flow diagrams, single-line and three-line diagrams, schematic diagrams, layouts, exploded views, parts lists and performance characteristics) VI. Recommended spare parts stocking list
The manufacturer's standard catalog is not an acceptable substitute for the manual.
1.6. PROJECT CONDITIONS
A. Noise Emission: Comply with applicable state and local government requirements for maximum noise level at adjacent property boundaries due to sound emitted by generator set including engine, engine exhaust, engine cooling-air intake and discharge, and other components of installation. Comply with ISO 8528-10 for sound measurements at 3.2 feet (1 m) and 23.0 feet (7 m).
B. Environmental Conditions: Engine-generator system shall withstand the following environmental conditions without mechanical or electrical damage or degradation of performance capability:
1. Ambient Temperature: [-15 to 104 deg F]
2. Relative Humidity: Zero to 95%
3. Altitude: Sea level to 1000 feet
1.7. EXTRA MATERIALS
A. Furnish extra materials described below that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.
1. Fuses: One for every 10 of each type and rating, but no fewer than one of each.
2. Indicator Lamps: Two for every six of each type used, but no fewer than two of each (Not required for digital displays or LED lamps)
3. Two sets of lubricating oil air filters, and combustion-air filters.
4. Special Tools: Tools unique to the product for standard maintenance, listed by part number in operations and maintenance manual
Reg CC Mtg, June 20, 2023, Page #187
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
ENGINE GENERATORS 263213
1.8. DELIVERY, STORAGE, AND HANDLING
A. Store and handle in strict compliance with manufacturer’s instructions and recommendations.
Protect from potential damage from weather and construction operations.
B. Manufacturer shall pack, crate, and protect equipment to prevent damage from handling, weather, shock, vibration, water and corrosion during shipment. Wrap packaged or crated assemblies in weatherproof plastic sheeting prior to shipment.
C. Shipping groups shall be shipped by truck, rail, or ship. Indoor groups shall be bolted to skids.
Breakers and accessories shall be packaged and shipped separately.
D. Generator shall be handled by crane. Provide lifting angle, ring bolts, spreader bar, special lifting fixture or other suitable means for lifting. Where cranes are not available, enclosure shall be suitable for skidding in place on rollers using jacks to raise and lower the groups.
E. Generator being stored prior to installation is by Others. Manufacturer shall define all storage requirements in order to prevent equipment deterioration or damage and maintain the Manufacturer’s warranty.
F. Damaged equipment will not be accepted by the job site.
1.9. BIDDING INFORMATION
A. Provide a base bid in accordance with the specification and all documents included with the Request for Quotation package.
B. Provide separate pricing for each of the following items as described in this specification:
1. On-Site Acceptance Test and Certification
2. On-Site Training
C. Bidding instructions for equipment specified herein shall be contained in the Request for Quotation documents issued by the Construction Manager. These instructions shall specify the date bids are required, the number of copies of bids to be submitted, and destination for same, and shall include required equipment delivery dates, special conditions for delivery and storage, submittal instructions for shop drawings and other pertinent instruction, such as all equipment prices shall be quoted FOB Destination.
D. Manufacturer shall comply with this Specification and all other technical documents as contained in the Request for Quotation Package to the fullest extent possible. If manufacturer must take exceptions to or deviate from this Specification, and/or other technical documents as provided in the Request for Quotation package, such exceptions and deviations shall be stated in the Proposal Form included with the Request for Quotation.
Reg CC Mtg, June 20, 2023, Page #188
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
ENGINE GENERATORS 263213
1.10. WARRANTY
A. Special Warranty: Equipment manufacturer shall guarantee equipment to be free of defects in workmanship and materials for a period of one (1) year from the date of field testing and acceptance by the Owner. Equipment manufacturer shall be allowed access to equipment for repair or replacement of defective components.
B. Defects in workmanship and materials or failure to meet guaranteed performance shall be corrected by the equipment manufacturer, at no additional cost, within thirty (30) days after being notified in writing of failure of equipment to meet the guarantee. Owner reserves the right to use the equipment in the meantime as required for operation until service is performed. Beneficial use of the equipment shall not be considered as acceptance.
PART 2. - PRODUCTS
2.1. ACCEPTABLE MANUFACTURERS
A. Acceptable Manufacturers: Subject to compliance with requirements, provide temporary diesel engine generator set of one of the following:
1. KwietPower
2. Cummins
3. Kohler
4. Caterpillar
B. Diesel Engine-Generator Sets
1. General: Except as otherwise indicated, provide manufacturer's standard diesel enginedriven generator set and auxiliary equipment as indicated by published product information, and as required for the complete installation as indicated on drawings.
2.2. TEMPORARY ENGINE-GENERATOR POWER SYSTEM
A. Provide a standby engine-generator power system as herein specified, and as shown on drawings, complete with all required equipment and accessories for a completely operable and satisfactorily performing system. It is the intent of these specifications to describe and obtain system equipment of current design for which service and parts can be easily and promptly obtained.
B. The system shall operate in a standby power capacity and the generator set will deliver power continuously under normal varying load factors with periodic loading up to 100% of the nameplate rating for short (cyclical) periods during a power outage for the duration of a power outage.
Reg CC Mtg, June 20, 2023, Page #189
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
ENGINE GENERATORS 263213
C. The system shall be completely furnished, tested, and shipped by the manufacturer of the enginegenerator set so there is a single source of supply and responsibility. The engine, cooling system, generator, enclosure, and fuel tank shall be factory assembled and tested as a unit. Provide all necessary appurtenances for connection of the generator to the external components of the engine-generator system.
D. The engine and generator shall be factory mounted on a roll up truck assembly welded steel mounting frame to maintain alignment of mounted components for suitable mounting to any level flat surface without depending on the concrete foundation. Provide lifting attachments sized and spaced to prevent deflection of base during lifting and moving.
E. The on-site power system shall be entirely separate from the commercial power system except for the installation of the automatic transfer switches and the connection from these switches to the normal power source. The electrical system will normally be connected to the commercial power source through the automatic transfer switches. Upon failure of the commercial power source, the engine generator set shall automatically start and the electrical system shall be automatically transferred to the engine-generator power source through the automatic transfer switch. Upon restoration of commercial power, the system shall be automatically retransferred to the commercial source and the engine generator set shall automatically shut down.
F. Each system shall include:
1. Electric engine-generator plant and all controls
2. Fuel oil pump, filter and associated piping
3. Lubrication system and filter
4. Cooling system radiator, pump and associated piping
5. Jacket coolant heater sized to ensure that engine will start within the specified time period and ambient conditions.
6. Air-intake filtration
7. Exhaust silencer and silencer flange kit and exhaust piping
8. Starting system motor, batteries and battery charger
9. Generator power circuit breaker mounted in enclosure
10. Generator set control and instrument monitoring panel mounted on the generator and with controls and instruments not less than hereinafter specified or required by referenced codes and standards
11. Remote status and alarm annunciator with controls and instruments not less than hereinafter specified or required by referenced codes and standards
12. Digital time indicating/interval timer and generator fail-to-start audio/visual alarm
13. Vibration isolators
14. All required accessories for a completely operable system
15. Ethylene glycol antifreeze for a 50% solution fill of the complete cooling system
16. Complete fill of engine crankcase oil
G. The engine-generator set shall be rated as noted below, for at a 0.8 or greater power factor for 480/277 volt, three-phase, four-wire wye, 60 Hz system.
H. Engine: The engine shall be diesel-fueled, multi-cylinder design. Engine shall be electric start, water cooled with radiator blow-through type fan with fan guard, cooling system thermostat, engine mounted and engine-driven jacket coolant pump, electric-immersion type jacket coolant heater. The engine shall be designed for starting and operating on winter-grade No. 2 commercial Reg CC Mtg, June 20, 2023, Page #190
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
ENGINE GENERATORS 263213
grade fuel oil.
i. An oil pump shall supply full pressure lubrication. The engine shall have an oil filter and strainer with replaceable filter element, oil cooler, fuel filters, heavy-duty air intake cleaner with replaceable dry filter element, and fuel pump. Oil flow shall be controlled with a thermostatic control valve capable of full flow and designed to be fail safe.
I. Cooling System: The generator set shall be equipped with a closed-loop, liquid-cooled, cooling system with integral engine driven coolant pump and radiator factory mounted on enginegenerator set frame. Temperature control provided by thermostatic-control valve. Expansion tank rated to withstand maximum closed-loop coolant system pressure for engine used and equipped with gauge glass and petcock. Flexible coolant hose assemblies with inside surface of nonporous rubber and outer covering of aging-, ultraviolet-, and abrasion-resistant fabric. The cooling system shall be sized to operate at full load conditions at ambient air entering the enclosure. The generator set supplier is responsible for providing a properly sized cooling system based on the enclosure static pressure restriction.
J. Silencer: An [EGSA Class 4] silencer capable of a dynamic insertion loss of at least [25 dB(A)] and selected as recommended by engine manufacturer, with companion flanges, and flexible stainless steel exhaust connector shall be furnished and installed according to the manufacturer's recommendation. The silencer shall be mounted so that its weight is not supported by the engine.
Exhaust system lengthening due to thermal expansion shall not be imposed on the engine.
Exhaust pipe size shall be sufficient to ensure that exhaust backpressure does not exceed the maximum limitations specified by the engine manufacturer.
K. Diesel Fuel-Oil System: Comply with requirements of NFPA 30. Fuel-oil piping shall be Schedule 40 black steel. Cast iron, aluminum, copper, and galvanizing shall not be used in the fuel-oil system.
L. Truck-Mounted Fuel-Oil Tank: The generator set manufacturer shall furnish a UL 142 listed, double walled, closed top-diked, skid-mounted fuel tank with rated capacity sized for operation of the generator at full load for minimum 24 hours. Provide tank connections for fuel supply line, fuel return line, vent line, exterior accessible local fuel fill port, and vandal resistant cap. A fuel return line cooler shall be provided as recommended by the manufacturer and assembler. Tank shall have float switches to alarm for low level (warning) at 70% tank rated capacity, low-low level (shutdown), overfill high fuel level (warning at 95% tank rated capacity, and tank interstitial space leak. Tank shall be provided with a mechanical fuel level gauge. Comply with requirements of NFPA 30 – Flammable and Combustible Liquids Code and NFPA 31 - Tanks for Liquid Fuels.
M. Starting System: Starting shall be by a positive shift-engaging starter. The starting system shall include: heavy-duty industrial type lead-acid batteries with capacity rating for not less than five (5) starts without recharging; battery connecting cables; engine-mounted battery charging alternator; and battery compartment mounted on engine base.
1. Provide a solid state, UL 1236 compliant, voltage regulated, automatic temperature compensating battery trickle charger to maintain fully-charged engine cranking batteries.
Charger unit shall have voltmeter, ammeter and fuses mounted in a NEMA 250 Type 1 charger cabinet and shall be designed for operation on 120 volt, 60 Hz source. Charger safety functions shall sense abnormally low battery voltage and close Form C dry contacts providing Reg CC Mtg, June 20, 2023, Page #191
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
ENGINE GENERATORS 263213
low battery voltage indication on control and monitoring panel; sense high battery voltage and loss of ac input or dc output of battery charger. Either condition shall close contacts that provide a battery-charger malfunction indication at system control and monitoring panel.
N. Engine Speed Control System: Engines shall be equipped with an electronic engine control module (ECM), that shall monitor and control engine functionality and seamlessly integrate with the generator set controller through digital communications. ECM monitored parameters shall be integrated into the generator’s controllers alarm and warning requirements.
1. The engine shall be provided with a governor which maintains the frequency within a bandwidth of the rated frequency, over a steady-state load range of zero to 100% of rated output capacity. The governor shall be configured for safe manual adjustment of the speed/frequency during operation of the engine generator set, without special tools, from 90 to 110% of the rated speed/frequency, over a steady state load range of zero to 100% of rated capacity. Isochronous governors shall maintain the midpoint of the frequency bandwidth at the same value for steady-state loads over the range of zero to 100% of rated output capacity.
O. Alternator, Exciter, and Voltage Regulator: The alternator shall be a revolving field type with brushless exciter, 2/3 pitch, and solid-state voltage regulator. The generator shall be one or two bearing, directly coupled to the engine flywheel housing and shall be driven through a coupling system that will insure permanent alignment. Temperature rise shall be within rating as defined by NEMA Standard MG 1. Insulation shall be Class H.
1. The generator exciter shall be of the brushless type utilizing provide permanent magnet excitation (PMG) for power source to voltage regulator and shall be rotated integrally with generator rotor. Semiconductor rectifiers shall have a minimum safety factor of 300% for peak inverse voltage and forward current ratings for all operating conditions, including 110% generator output at 104 degrees F ambient. The exciter and regulator in combination shall maintain generator-output voltage within the limits specified.
2. Voltage regulator shall be solid-state type, separate from exciter, providing performance as specified and as required by NFPA 110. Voltage regulation shall be within ±2% of rated voltage from no-load to full-load. The instantaneous voltage dip shall be not more than 20% of rated voltage when any addition of load up to 90% of rated load and rated power factor is applied to the alternator and the recovery to stable operation shall occur within 4.5 seconds.
Stable operation shall be defined as operation with terminal voltage remaining constant within ±1% of rated voltage. Provide control for a minimum of ±5% voltage adjustment from rated voltage. Total harmonic content of the AC waveform shall not exceed 5% RMS measured line to line at rated load and Telephone Influence Factor (TIF) shall not exceed 50 by NEMA Standards.
P. Control and Monitoring: Engine and generator control and instrument panel shall be mounted on the engine generator set utilizing a mounting method to isolate the control panel from generatorset vibration.
1. The control system shall provide pre-wired customer use communications support via RS232, RS485, or an optional modem. Additional I/O utilizing Modbus RTU must be an available option. Customer I/O shall be software configurable providing full access to all alarm, event, data logging, and shutdown functionality.
Reg CC Mtg, June 20, 2023, Page #192
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
ENGINE GENERATORS 263213
2. Manufacturer shall provide remote access to monitoring generator status and all alarms.
3. The engine-mounted panel shall contain the following indicators:
a. AC voltmeter and ammeter with phase selector switches b. AC frequency meter
c. DC voltmeter
d. Battery charge-rate meter
e. Engine-coolant temperature gauge
f. Engine lubricating-oil pressure gauge
g. Running-time meter
h. Indicating light for each abnormal condition safety device i. Audible alarm with silence switch to give alarm on any abnormal condition
4. The engine-mounted panel shall also contain the following switches, controls, protective devices, alarms and interfaces:
a. Selector switch for "run-off-auto" control of engine b. Lamp test switch
c. Emergency stop switch
d. Remote start terminals (two-wire system) for engine start and stop control to operate from the automatic transfer switches
e. Automatic cycle cranker to provide not less than four (4) cycles of cranking f. Adjustable timing relay set for minimum running time after engine is started g. Cranking limiter to open starting circuit if engine has not started after last cycle of cranking with overcrank alarm
h. Overspeed shutdown device
i. Coolant high-temperature and low level shutdown devices. j. Coolant high-temperature pre-alarm, high temperature alarm and low temperature alarm k. Main fuel tank low-level alarm
l. Low lube oil pressure shutdown device
m. Generator overcurrent protective device not closed alarm n. Auxiliary interlock contacts for the auxiliary fuel pump and the fuel shut-off solenoid valve o. Terminals for pre-shutdown alarm on low oil pressure and high coolant temperature p. Battery charger failure alarm
q. Generator control switch not in automatic mode alarm r. Terminals for extension of each alarm and status indication to remote alarm panel specified
5. Remote Safety Control Devices:
a. Emergency-Stop Switch: For each generator, wall mounted at location as indicated on drawings, and labeled with function and generator set name. Push button shall weatherproof and be protected and located to prevent inadvertent or unintentional operation.
6. Common Remote Panel with Common Audible: Comply with NFPA 110 requirements.
Include necessary contacts and terminals in control and monitoring panel. Remote panel shall be powered from the engine-generator set battery
7. Remote Alarm Annunciator: The engine-generator manufacturer shall furnish a remote alarm annunciator panel suitable for surface or flush mounting as indicated on the drawings. Alarm Reg CC Mtg, June 20, 2023, Page #193
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
ENGINE GENERATORS 263213
panel shall utilize LED-type visual indicator lamps with identification wording as approved; common audible signal with silence switch incorporating a "reinitiate alarm" feature if not returned to normal position after alarm condition has been cleared or if additional alarms occur; and lamp test button.
8. The engine-generator set control and instrument panel shall be furnished with all control and alarm contacts, factory pre-wired to labeled terminal blocks in the engine generator set control and instrument panel for extension to the remote annunciator and alarm panel for all indications listed below. The fuel-oil tank low-level and high level alarm indication shall be from contacts in the fuel tank. The Contractor shall install the remote annunciator and alarm panel in location indicated on drawings and shall install all wiring from the engine-generator and oil tank gauge assembly to the remote panel and make all connections. The remote annunciator panel shall have individual visual annunciators for each of the following and audible alarm for the conditions listed.
Conditions Indicated Alarm Color Audible
Generator Running Green No
Over crank (Failed to Start) Red Yes
Low Oil Pressure Amber Yes
High Cooling Water Temperature Amber Yes
Low Cooling Water Temperature Amber Yes
Engine Over speed Red Yes
Low Battery Voltage (Charger Malfunction) Red No
High Battery Voltage (Charger Malfunction) Red No
Generator Over voltage Red Yes
Control Switch in Auto Position (Standby Mode)Green No
Engine Speed Down to 95% (Under speed) Red Yes
Low Fuel Level Red Yes
High Fuel Level Red Yes
Ground Fault Red Yes
Leak Detection Red Yes
9. The controller shall include the ability to accept six (6) total digital inputs with four (4) programmable digital inputs. The signals may be programmed for either high or low activation using programmable normally open (NO) or normally closed (NC) contacts.
10. The controller shall include the ability to operate six (6) total with four (4) form A normally open programmable relay output signals, integral to the controller. Relay shall be rated for a maximum of 2A @ 30VDC.
Q. Generator Overcurrent and Fault Protection: Provide engine mounted 100% rated, molded-case, thermal-magnetic trip type circuit breakers with shunt trip and amperage rating as listed on the drawings. The breaker shall be UL listed, connected to engine-generator safety shutdowns, and automatically controlled by the package mounted generator set controls. Provide with auxiliary switch for connection to supervisory “generator overcurrent protective device not closed” alarm circuit.
Reg CC Mtg, June 20, 2023, Page #194
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
ENGINE GENERATORS 263213
1. In case of power outage the generator shall start in 10 seconds with full load as required by NFPA70 Article 700.
2. Breaker shall be housed in an extension terminal box which is isolated from vibrations induced by the generator set. Compression type lugs, sized for the circuit breaker feeders shown on drawing, shall be supplied on the load side of breaker. Circuit breakers shall have fault current rating as indicated on the drawings but at least equal to the maximum fault current the generator is capable of providing to a bolted fault at the terminals of the breakers.
2.3. OUTDOOR GENERATOR SET ENCLOSURE
A. Generator shall be provided with a outdoor weatherproof enclosure. Provide with the following:
1. Enclosure shall have multiple removable, gasketed and lockable access panels at all points requiring maintenance access. Panels shall be removable by one person without tools.
2. Space Heater: Thermostatically controlled and sized to prevent condensation. Provide as needed to meet NFPA 110, Level 1 temperature levels.
3. Convenience Outlet: Factory wired, 20 ampere, 120V GFCI. Mount inside enclosure and arrange for external electrical connection.
4. Thermal Insulation: Manufacturer's standard materials and thickness selected in coordination with space heater to maintain winter interior temperature within operating limits required by engine-generator-set components.
5. Silencer Location: Within enclosure. All exhaust piping shall be wrapped for personnel protection and to eliminate excessive heat buildup during generator operation.
6. Engine Cooling Airflow through Enclosure: Maintain temperature rise of system components within required limits when unit operates at 110% of rated load for 2 hours with ambient temperature at top of range specified in the Project Conditions section. Inlet and exhaust air handling equipment shall be designed so as to maintain a combined total maximum static pressure drop of 0.5 inches of water gauge through the enclosure, including all air handling devices.
7. Louvers: Fixed-engine, cooling-air inlet and discharge. Storm-proof and drainable louvers prevent entry of rain and snow. Provide insect and rodent screens on all openings into enclosure.
8. Assembly Hardware (Nuts and Bolts): Use JS500 and nylon washers to prevent paint deterioration.
9. Enclosure Finish: Paint enclosure in manufacturer’s standard color with powder-coat paint.
2.4. LOAD BANK
A. Description: Temporary, on roll-up truck, outdoor, weatherproof, resistive unit capable of providing load to generator set at 100 percent rated-system capacity. Unit may be composed of separate resistive and reactive load banks controlled by a common control panel. Unit shall be capable of selective control of load in 25% steps and with minimum step changes of approximately 5 and 10% available.
B. Resistive Load Elements: Corrosion-resistant chromium alloy with ceramic and steel supports.
Reg CC Mtg, June 20, 2023, Page #195
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
ENGINE GENERATORS 263213
Elements shall be double insulated and designed for repetitive on-off cycling. Elements shall be mounted in removable aluminized-steel heater cases utilizing slide-out, removable trays to allow service without major disassembly of the load bank.
C. Reactive Load Elements: Epoxy-encapsulated reactor coils. Load elements shall be mechanically-supported over their entire length, to avoid any failed element from shorting to an adjacent conductor or to ground.
D. Load-Bank Heat Dissipation: Integral fan with totally enclosed fan cooled (TEFC) motor shall provide uniform cooling airflow through load elements. Fan blades shall be cast aluminum.
Airflow and coil operating current shall be such that, at maximum load, with ambient temperature at the upper end of specified range, load-bank elements operate at not more than 50% of maximum continuous temperature rating of resistance elements.
E. Load Element Switching: Remote-controlled contactors switch groups of load elements.
Contactor coils are rated 120 V. Contactors shall be located in a separate NEMA 250, Type 3R enclosure within load-bank enclosure, accessible from exterior through hinged doors with tumbler locks.
F. Contactor Enclosures: Heated by thermostatically controlled strip heaters to prevent condensation.
G. Load-Bank Enclosures: NEMA 250, Type 3R, complying with NEMA ICS 6. Enclosure walls shall be double wall construction to provide a low temperature exterior shell. Louvers at coolingair intake and discharge openings shall prevent entry of rain and snow. Openings for airflow shall be screened with 1/2-inch- (13-mm-) square, galvanized-steel mesh. Reactive load bank shall include automatic shutters at air intake and discharge. Exhaust airflow shall be directed upwards through rain/snow shedding louvers, and away from building openings. Exterior hardware and all door hinges shall be stainless steel.
H. Protective Devices: Power input circuits to load banks shall be fused, and fuses shall be selected to coordinate with generator circuit breaker. Fuse blocks shall be located in contactor enclosure.
Cooling airflow and overtemperature sensors shall automatically shut down and lock out load bank until manually reset. Safety interlocks on access panels and doors shall disconnect load power, control, and heater circuits. Fan motor shall be separately protected by overload and short-circuit devices. Short-circuit devices shall be noninterchangeable fuses with 200,000-A interrupting capacity. All power wiring shall have 150° C insulation, and control wiring shall have a minimum 105° C insulation.
I. Remote-Control Panel: Separate from load bank in NEMA 250, Type 1 enclosure with a control power switch and pilot light, and switches controlling groups of load elements.
J. Control Sequence: Control panel may be preset for adjustable single-step loading of generator during automatic exercising. Automatic protection features shall include “fan failure”, “high exhaust temperature” and “high intake air temperature”.
2.5 MOBILE GENERATOR CONNECTION BOX
Reg CC Mtg, June 20, 2023, Page #196
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
ENGINE GENERATORS 263213
A. Acceptable Manufacturers: Subject to compliance with requirements, provide transfer switches by one of the following:
B. Automatic Transfer Switches
1. ASCO Power Technologies
2. Eaton
3. Square-D
4. Berthold Electric Company
5. IEM
C. Description: Permanent, outdoor, weatherproof mobile generator connection box with Cam-Lok connectors and sealable cable openings in the bottom of the connection box. Comply with UL 1773 – Termination Boxes. [Comply with UL 1008 Supplement SB - Accessories, Transfer Switch.]
D. Enclosure: NEMA 3R wall mounted enclosure with bottom access to cable terminations and equipped with protected entry. Enclosure made from code gauge steel painted with polyester powder coat. All terminations shall be accessible from the front of the enclosure. The assembly shall be provided with adequate lifting means. Doors shall have provisions for padlocking.
E. Connections: Cam-Lok J-Series E1016 male connectors with snap covers mounted inside the enclosure. Refer to drawings for amperage, voltage and fault current ratings.
F. Accessories: 2-key Kirk Key interlock configured as shown on the drawings.
G. Wire connections: connection wires as indicated on drawings.
PART 3 - EXECUTION
3.1. EXAMINATION
A. Examine areas, equipment bases, and conditions, with Installer present, for compliance with requirements for installation and other conditions affecting packaged engine-generator performance. Examine roughing-in for piping systems and electrical connections. Verify actual locations of connections before packaged engine-generator installation. Proceed with installation Reg CC Mtg, June 20, 2023, Page #197
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
ENGINE GENERATORS 263213
only after unsatisfactory conditions have been corrected.
3.2. PREPARATION
A. Interruption of Existing Electrical Service: Do not interrupt electrical service to facilities occupied by Owner or others unless permitted under the following conditions and then only after arranging to provide temporary electrical service according to requirements indicated:
1. Notify Construction Manager no fewer than seven (7) days in advance of proposed interruption of electrical service.
2. Do not proceed with interruption of electrical service without Owner’s written permission.
3.3. INSTALLATION
A. Comply with packaged engine-generator manufacturers' written installation and alignment instructions, with NFPA 110 and with NECA/EGSA Standard 404. Install packaged enginegenerator to provide access and required electrical working clearances, without removing connections or accessories, for periodic maintenance. Coordinate with other work, including raceways, electrical boxes and fittings, fuel tanks, piping and accessories, as necessary to interface installation of engine-generator equipment work with other work.
B. Equipment Mounting: Install packaged engine generators on cast-in-place concrete equipment bases. Coordinate size and location of concrete bases for packaged engine generators with actual equipment provided. Cast Type J anchor-bolt inserts into bases.
C. Fuel Piping: Copper and galvanized steel shall not be used in the fuel-oil piping system.
D. Electrical Wiring: Install electrical devices furnished by equipment manufacturers but not specified to be factory mounted.
E. Fluids: The Contractor shall fill the engine crankcase with API certified oil, category as recommended by the engine manufacturer. Furnish and fill the complete engine water-cooling system with a 50% solution of ethylene glycol anti-freeze and distilled water. Anti-freeze shall provide protection to -30°F. Fill the engine crankcase with high-grade motor oil as recommended by the engine manufacturer.
3.4. CONNECTIONS
A. Connect power, grounding, control and annunciating wiring utilizing stranded conductors installed in flexible conduit a minimum of 18 inches long to accommodate engine vibrations. For vibration isolation, flexible fittings shall be provided for all conduit, cable trays, and raceways attached to engine-generator sets; metallic conductor cables installed on the engine generator set and from the engine generator set to equipment not mounted on the engine generator set shall be flexible stranded conductor; and terminations of conductors on the engine generator set shall be Reg CC Mtg, June 20, 2023, Page #198
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
ENGINE GENERATORS 263213
crimp-type terminals or lugs. Install control and signal wiring, from the generator set to the transfer switch and remote annunciator, in separate raceways from power conductors to minimize power circuit interference with control circuits.
B. Tighten connectors and terminals, including screws and bolts, in accordance with equipment manufacturer's published torque tightening values for equipment connectors. Where manufacturer's torque requirements are not indicated, tighten connectors and terminals to comply with tightening torques specified in UL Standards 486A, B and the National Electrical Code.
3.5. IDENTIFICATION
A. Install a sign indicating the generator neutral is bonded to the main service neutral at the main service location. Install a sign at the service entrance equipment that indicates the type and location of on-site emergency legally required and optional standby power sources.
3.7. FACTORY TESTING
A. Testing shall include a complete check of safety and control circuitry, sound level at full load, time required for frequency and voltage regulation to return to normal upon application of 25%, 50%, 75% and full load, alignment, and instrumentation, including frequency and voltage regulation; and testing of the unit's transient response characteristics and vibration readings of the completed unit. Factory load testing shall be at rated power factor.
B. Testing shall demonstrate the unit(s) to be free of critical speeds of either major or minor magnitude.
C. Testing shall include a load test as follows:
1. One (1) hour at 50% load.
2. One (1) hour at 75% load.
3. Four (4) hours at 100% load.
4. 100% single-step load application and acceptance of the load within 10 seconds.
D. The following engine parameters shall be read and recorded at 15-minute intervals throughout the test:
1. Engine oil pressure.
2. Engine oil temperature.
3. Jacket coolant temperature in and out.
4. Engine rpm.
5. Fuel pressure.
6. Ambient air temperature.
3.8. FIELD QUALITY CONTROL
A. The manufacturer of the engine-generator set shall provide the services of a qualified factory Reg CC Mtg, June 20, 2023, Page #199
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
ENGINE GENERATORS 263213
trained service technician, start-up testing and performance testing of the engine-generator system for checking the completed installation, for making all necessary adjustments, for installation testing, and for a minimum of four hours for instructing the Owner's Representatives in the operation and care of the complete system. Include all costs for this service, including travel and lodging expenses, in the base price for the project. The service technician shall work in coordination with the installing Electrical and Mechanical Contractors.
B. Start-Up Testing: Provide manufacturer’s factory-trained representative to perform start-up inspection and testing. Prior to energizing any electrical components, perform visual and mechanical inspections and electrical and mechanical tests listed in the two paragraphs below.
Certify compliance with test parameters.
C. Visual and Mechanical Inspection:
1. Compare equipment nameplate data with drawings and specifications.
2. Inspect physical and mechanical condition.
3. Inspect anchorage, alignment, and grounding.
4. Verify the unit is clean.
5. Check fuel, lubricating oil, and antifreeze for conformity to the manufacturer's recommendations under environmental conditions present.
D. Electrical and Mechanical Tests:
1. Perform continuity and short circuit checks on all wiring.
2. Prior to cranking engine for proper operation, test accessories that normally function while the set is in a standby mode. Accessories include jacket coolant heater, battery, battery charger, and remote annunciator.
3. Perform insulation-resistance tests in accordance with IEEE 43.
4. Test protective relay devices.
5. Test emergency shutdown operators.
6. Verify voltage, phase rotation, phasing, and synchronized operation as required by the application.
7. Functionally test engine shutdown for low oil pressure, overtemperature, overspeed, and other protection features as applicable.
8. Verify correct functioning of the governor and regulator.
9. System Integrity Tests: Methodically verify proper installation, connection, and integrity of each element of engine-generator system before and during system operation. Check for exhaust leaks, fluid leaks, cooling air flow, movement during starting and stopping, vibration during running.
Repair leaks and retest until no leaks exist.
E. Performance Tests: Provide manufacturer’s factory-trained representative to perform performance tests upon completion of start-up testing, with the Engineer in attendance; provide certified test record. Tests are to include the following:
1. Battery Tests: Equalize charging of battery cells according to manufacturer's written instructions.
Record individual cell voltages. Measure charging voltage and voltages between available battery terminals for full-charging and float-charging conditions. Check electrolyte level and specific gravity under both conditions. Test for contact integrity of all connectors. Perform an integrity load test and a capacity load test for the battery. Verify acceptance of charge for each element of the battery after discharge. Verify that measurements are within manufacturer's specifications.
Reg CC Mtg, June 20, 2023, Page #200
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
ENGINE GENERATORS 263213
2. Battery-Charger Tests: Verify specified rates of charge for both equalizing and float-charging conditions.
3. Noise Level Tests: Measure A-weighted level of noise emanating from engine-generator installation, including engine exhaust and cooling-air intake and discharge, at a radial distance of 23 feet from edge of the generator enclosure.
4. Provide a resistive load bank to test generator at full load and unity power factor for a period of at least four hours. The test is intended to test the capability of the generator in its installed condition.
Load test shall not occur until all components of the generator system are completely installed to include, but not limited to, the intake and exhaust ductwork, exhaust piping, and dampers and louvers. Apply load in steps of 25%, 50%, 75% and 100% of the nameplate rating in equal durations for the specified total test time. If the engine load run test is interrupted for any reason, the entire test shall be repeated.
5. Test, by means of simulated power outage using actual building load, automatic start-up by remoteautomatic starting, transfer of load, and automatic shutdown. Prior to this test adjust, for proper system coordination, transfer switch timers. Coordinate tests with tests for transfer switches and run them concurrently.
F. Monitor, throughout all tests, ambient temperature, engine coolant temperature, oil pressure and temperature, battery charge level, generator voltage, amperes, frequency, power factor.
Measurements are to be recorded after stabilization of an engine-generator set parameter.
G. Report results of tests and inspections in writing. Record adjustable relay settings and measured insulation resistances, time delays, and other values and observations. Attach a label or tag to each tested component indicating satisfactory completion of tests.
H. Where possible, correct malfunctioning units at site, then retest to demonstrate compliance; otherwise, remove and replace with new units, and proceed with retesting. Initial testing and retesting shall be at no cost to the Owner.
I. Infrared Testing:
1. After Substantial Completion, but not more than 60 days after Final Acceptance, perform infrared scan of all field and installation connections for each piece of equipment. Testing shall when equipment is under maximum possible load for a minimum of 5 minutes and included photos showing test views.
a. Act on inspection results according to the recommendations of NETA ATS, Table 100.18. Correct possible and probable deficiencies as soon as Owner's operations permit.
Retest until deficiencies are corrected.
b. Provide copies of test reports, findings, remediations, and retests with operations and maintenance manuals at conclusion of Project. Prepare a certified report that identifies the testing technician and equipment used and lists the results as follows:
i. Description of equipment to be tested.
ii. Discrepancies.
iii. Temperature difference between the area of concern and the reference area. iv. Probable cause of temperature difference.
v. Areas inspected. Identify inaccessible and unobservable areas and equipment. vi. Identify load conditions at time of inspection.
vii. Provide photographs and thermograms of the deficient area. viii. Provide calibration record for infrared-scanning instrument(s) used.
Reg CC Mtg, June 20, 2023, Page #201
CITY OF LOMITA AEPC Group, LLC
EMERGENCY STANDBY GENERATOR AT APPIAN WAY
ENGINE GENERATORS 263213
2. After the successful completion of all testing, the Contractor shall “top off” all fluids including fuel.
3.9. ADJUSTING AND CLEANING
A. After fabrication and before assembly, piping interiors shall be manually wiped clean of all debris.
B. Prior to equipment start-up, vacuum all scrap, wire, dust and other debris from the generator and associated equipment. Do not use compressed air to blow debris out of the generator or circuit breaker enclosure, since debris may settle inside devices and impair their ability to function.
C. On completion of installation, inspect system components. Replace all parts and covers. Check for any pinched wires and close all doors. Ensure the enclosure parts are properly aligned and fastened securely. Remove paint splatters and other spots, dirt, and debris. Repair damaged finish to match original finish. Clean components internally using methods and materials recommended by manufacturer.
3.10. TRAINING AND DEMONSTRATION
A. Building Operating Personnel Training: Engage a factory-authorized service representative to train Owner's maintenance personnel in adjusting, operating, and maintaining packaged enginegenerators. Training shall be for one eight-hour session instructing personnel in the maintenance and operation of the equipment, on the dates requested by the Engineer. Training shall include procedures for starting-up, testing, and operating diesel engine-driven generator sets.
1. Training shall include written documentation provided to the Owner containing condensed operating instructions describing manufacturer's pre-start checklist and precautions; startup procedures for test-mode, manual-start mode, and automatic-start mode (as applicable); running checks, procedures, and precautions; and shutdown procedures, checks, and precautions.
B. Service: Manufacturer shall make available to the Owner, at the completion of the guarantee, a maintenance and service agreement via the nearest certified vendor's service center.
END OF SECTION 263213.13
Reg CC Mtg, June 20, 2023, Page #202
NOTICE OF EXEMPTION
Project Title: Emergency Standby Generator at Appian Way Project Description:
Standby Generator at Appian Way Project – The project is located at the Appian Way Pressure Reducing Station. The project includes the procurement of a standby generator and load bank, installation of an electrical cabinet, new circuit breaker in the existing main switchboard, KirkKey interlock, conduits and wiring, GFI receptacle, and the testing of the standby generator to ensure electrical connectivity. Filed by the City of Lomita Finding:
The City Council of the City of Lomita has reviewed the above proposed project and finds it to be exempt from the provisions of the California Environmental Quality Act (CEQA).
Ministerial Project
Categorical Exemption (CEQA Guidelines, Section 15269 (c) Emergency Projects) Statutory Exemption
Emergency Project
Quick Disapproval [CEQA Guidelines, Section 15270]
No Possibility of Significant Effect [CEQA Guidelines, Section 15061(b)(3)] Supporting Reasons In accordance with Section 15269 (c) Emergency Projects of the California Environmental Quality Act (CEQA) Guidelines, the installation and use of the standby generator can be found to be exempt from the requirements of CEQA. The proposed project consists of the installation of a new electrical cabinet, main switchboard, conduits and wiring at the Appian Way Pressure Reducing Station to ensure electrical connectivity with the standby generator. If primary power is lost, the standby generator will allow the water pressure reducing station to run and maintain normal operations. The purpose of the generator is to support the station as needed and it is not anticipated to be used in any circumstances other than to prevent an emergency event. 6/20/23
(Date) Carla Dillon, Director of Public Works
Public Works Department
24300 Narbonne Avenue
Lomita, CA 90717
310/325-7110
Attachment No 2
Reg CC Mtg, June 20, 2023, Page #203
GEN-TECH of Colorado, LLC
dba GEN-TECH
8800 Susan Avenue SE
Albuquerque, NM 87123
Phone: (303) 884-4842
Fax: (303) 426-4558
GEN-TECH of Colorado, LLC
dba GEN-TECH
8080 Pontiac Street
Commerce City, CO 80022
Phone: (303) 428-2517
Fax: (303) 426-4558
Corporate Office
Arizona Generator Technology, Inc.
dba GEN-TECH
7901 North 70th Avenue Glendale,
AZ 85303
Phone: (623) 937-1719
Fax: (623) 937-0408
Arizona Generator Technology, Inc.
dba GEN-TECH
4702 South Tennessee Place Tucson,
AZ 85714
Phone: (520) 777-3130
Fax: (520) 203-8477
GEN-TECH of Nevada, Inc.
dba GEN-TECH
4785 Copper Sage Street
Las Vegas, NV 89115
Phone: (702) 633-5960
Fax: (702) 633-5960
LOMITA GABARATOR R4 WITH TRAILER INDUSTRIAL GENERATOR QUOTATION