GP Goals and Policies
None.

GP EIR Mitigation Measures
No Mitigation Measures are required.

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 182

Menifee Mayor and City Council
December 3, 2025
Page
774 of 966

CEQA Consistency Analysis and Checklist
City of Menifee Menifee 27 Residential Project
162

5.19. UTILITIES AND SERVICE SYSTEMS
Would the project:

Project
Impact
that is
Peculiar to
the Project
or the
Project Site
Significant
Impact not
Analyzed
as
Significant
in the Prior
EIR
Potentially
Significant
Off-site or
Cumulative
Impact not
Discussed
in the prior
EIR
Adverse
Impact
More Severe
based on
Substantial
New
Information
No New
Impact
Not
Previously
Analyzed
in the Prior
EIR
a) Require or result in the
relocation or construction of
new or expanded water or
wastewater treatment
facilities or expansion of
existing facilities, the
construction of which could
cause significant
environmental effects?

b) Have sufficient water
supplies available to serve
the project and reasonably
foreseeable future
development during normal,
dry, and multiple dry years?

c) Result in a determination
by the wastewater treatment
provider which serves or may
serve the project that it has
adequate capacity to serve
the project’s projected
demand in addition to the
provider’s existing
commitments?

d) Generate solid waste in
excess of State or local
standards or in excess of the
capacity of local
infrastructure or otherwise
impair the attainment of solid
waste reduction goals?

e) Comply with federal,
State, and local
management and reduction
statutes and regulations
related to solid waste?

Summary of Impacts Identified in the GP EIR
The GP EIR discussed impacts related to utilities and service systems under Section 5.17, Utilities/Service Systems, pages 5.17-1 through 5.17-20.

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 183

Menifee Mayor and City Council
December 3, 2025
Page
775 of 966

CEQA Consistency Analysis and Checklist
City of Menifee Menifee 27 Residential Project
163
The GP EIR determined that projected net increases in water demand resulting from buildout would be adequately accommodated by existing and planned water supplies. The Eastern Municipal Water District (EMWD) anticipated increasing its supplies by 88,300 acre-feet per year, while the GP would result in an increase of only 16,800 acre -feet per year. The GP EIR found that regional water supply would remain sufficient to support full buildout, and therefore, impacts would be less than significant.

The GP EIR found that the region’s water treatment capacity would be sufficient to meet the increased demand from buildout. EMWD’s existing and planned facilities, including the Perris II Desalter and the expansion of the Perris Water Filtration Plant, would provide almost 900 million gallons per day of treatment capacity. The GP EIR concluded that these improvements would accommodate future needs, and impacts would be less than significant.

The GP EIR determined that the existing and planned wastewater treatment capacity provided by EMWD would be sufficient to accommodate projected increases in wastewater generation associated with buildout of the GP. No additional capacity beyond what was already planned would be required. Therefore, the GP EIR found that impacts would be less than significant.

The GP EIR found that implementation of the GP would not conflict with the wastewater discharge requirements of the Santa Ana Regional Water Quality Control Board (RWQCB). Development under the GP would be subject to compliance with the Municipal Separate Storm Sewer System (MS4) Permit or, for certain industrial uses, individual permits that include necessary discharge requirements. As a result, the GP EIR determined that impacts would be less than significant.

The GP EIR determined that stormwater runoff associated with buildout would be accommodated by proposed drainage infrastructure improvements. These include planned facilities identified in the Homeland- Romoland Area Drainage Plan, the Romoland Master Drainage Plan, and new City storm drains. Therefore, the GP EIR found that impacts related to stormwater infrastructure would be less than significant.

The GP EIR found that solid waste generated from buildout could be adequately accommodated by existing regional landfill capacity. The GP would not result in the need for new or expanded landfill facilities. As such, the GP EIR determined that impacts to solid waste services would be less than significant.

The GP EIR found that electricity and natural gas utilities have sufficient capacity to meet the projected demand associated with buildout. No new energy infrastructure or additional supply sources would be required. The GP EIR concluded that energy impacts would be less than significant.

Summary of Impacts Identified in the SP EIR
The SP EIR discussed impacts related to utilities and service systems under Section 4.21, Utilities and Service Systems, pages 97 through 105.

The SP EIR determined that payment of applicable fees and compliance with District and County requirements would ensure that adequate infrastructure are provided. Therefore, impacts related to system capacity and construction of new or expanded utility facilities were determined to be less than significant.

The SP EIR found that adequate water supplies would be available to serve the Specific Plan, with implementation of required off-site and on-site reclaimed water system improvements. As such, water supply impacts were determined to be less than significant.

The SP EIR concluded that the payment of fees to EMWD would support the expansion of wastewater treatment capacity and prevent negative financial impacts to the District. Additionally, implementation of the Water and Sewer Plan Development Standards of the SP would further reduce impacts. Based on these considerations, the SP EIR determined that wastewater-related impacts would be less than significant.

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 184

Menifee Mayor and City Council
December 3, 2025
Page
776 of 966

CEQA Consistency Analysis and Checklist
City of Menifee Menifee 27 Residential Project
164
The SP EIR also evaluated solid waste service capacity, noting that development under the SP was estimated to generate approximately 83.8 tons of refuse daily, based on projected population growth. To address this, the SP EIR incorporated Mitigation Measur es D.8.1 and D.8.2, requiring coordination with the County Waste Management District, notification of local haulers regarding County Resolution No. 90 -402, and design considerations such as trash compactors and recycling collection points. With implementation of these Mitigation Measures and compliance with applicable regulations, including the County Solid Waste Management Plan and the Integrated Waste Management Act of 1989, the SP EIR determined that impacts related to solid waste infrastructure and regulations would be less than significant.

Project-Specific Impacts
a) Require or result in the construction of new or expanded water, wastewater treatment or storm water drainage, electric power, natural gas, or telecommunications facilities, the construction or relocation of which could cause significant environmental effects? No New Impact. This topic was evaluated in the GP EIR and was determined to be less than significant.

Water
As described in the GP EIR, the Project site is located within the service area of the EMWD, which provides potable water, recycled water, and wastewater services to an area of approximately 555 square miles in western Riverside County. EMWD’s water system includes 2,421 miles of transmission and distribution water mains, 4 operating regional water reclamation facilities, and 2 water filtration facilities (Water Systems Consulting, Inc., 2021).

Potable water service for the proposed Project would be provided via the installation on -site eight-inch water line located within the proposed Project’s internal private roadways. The on-site system would connect to an existing eight -inch public water line located in Palomar Road . The new on- site water system would convey water supplies to the proposed building and landscaping through plumbing/landscaping fixtures that are compliant with the CAL Green Plumbing Code for efficient use of water and that are consistent with GP goals and policies. Installation of the new water distribution lines would only serve the proposed Project and would not provide new water supplies to any off-site areas. The construction activities related to the on- site water infrastructure that would be needed to serve the proposed Project are included as part of the proposed Project and would not result in any physical environmental effects beyond those identified throughout this document. For example, analysis of construction emissions from excavation and installation of the water infrastructure is included in Section 5.3, Air Quality, and Section 5.8, Greenhouse Gas Emissions.

Furthermore, as described in Section 5.10, Land Use and Planning, and Section 5.14, Population and Housing, the proposed Project is consistent with land uses anticipated for the area by the GP and would not induce substantial unplanned population. Thus, it is not anticipated that implementation of the proposed Project would require construction of new or expanded water facilities and no additional water supplies would be needed to accommodate the proposed Project beyond what is anticipated by EMWD, as described in more detail below under impact 5.19 b). Therefore, the proposed Project would not result in the construction of new water facilities or expansion of existing facilities, the constructi on of which could cause significant environmental effects, and impacts would be less than significant.

Wastewater
As described in the GP EIR, EMWD provides wastewater treatment and recycled water services throughout its service area, which includes the Project site.

Development of the proposed Project would include the installation of eight-inch sewer lines within the internal private roadways, which would connect to an existing 15 -inch sewer main located along the western Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 185

Menifee Mayor and City Council
December 3, 2025
Page
777 of 966

CEQA Consistency Analysis and Checklist
City of Menifee Menifee 27 Residential Project
165
boundary of the Project site. The construction activities related to installation of the on -site sewer infrastructure that would serve the proposed Project is included as part of the proposed Project and would not result in any physical environmental effects beyond those identified throughout this document. For example, analysis of construction emissions for excavation and installat ion of the sewer infrastructure is included in Section 5.3, Air Quality, and 5.8, Greenhouse Gas Emissions, and noise volumes from these activities are evaluated in Section 5.13, Noise . As the proposed Project includes facilities to serve the proposed development, it would not result in the need for construction of other new wastewater facilities or expansions, the construction of which could cause significant environmental effects.

As described above, the proposed Project is consistent with the land use and growth assumptions of the GP and would not induce substantial unplanned population growth. Therefore, implementation of the proposed Project is not anticipated to require the construction of new or expanded wastewater treatment facilities beyond those already planned by EMWD. As a result, the proposed Project would not require the construction of new wastewater treatment facilities or expansion of existing facilities that could res ult in significant environmental impacts. Impacts would be less than significant.

Stormwater
As discussed above in Section 5.10, Hydrology and Water Quality, due to the appropriate sizing of the on- site drainage features, as demonstrated in the Project’s Hydrology Report (Appendix F), and as ensured through the Project permitting process, operation of the proposed Project would not substantially increase stormwater runoff, and the proposed Project would not require or result in the construction of new off -site storm water drainage facilities or expansion of existing off-site facilities.

Electric Power
The proposed Project would connect to the existing Southern California Edison electrical distribution facilities that are adjacent to the Project site and would not require the construction of new electrical facilities.

Adequate industrial electricity supplies are presently available to meet the incremental increase in demand attributed to the Project. Provision of electricity to the Project site is not anticipated to require or result in the construction of new facilities or the expansion of existing facilities, the construction or relocation of which would cause significant environmental impacts to electricity.

Natural Gas
The proposed Project would not connect to existing natural gas infrastructure. Therefore, the proposed Project would result in no new impacts related to construction of new or expanded utilities that could result in significant environmental effects.
b) Have sufficient water supplies available to serve the project and reasonably foreseeable future development during normal, dry, and multiple dry years? No New Impact. This topic was evaluated in the GP EIR and was determined to be less than significant.

As described above, the proposed Project would be serviced by EMWD. EMWD’s Urban Water Management Plan (UWMP) is a tool that provides a summary of anticipated water supplies and demands for the next 20 years for the region that EMWD services including most of the City of Menifee, other cities, and unincorporated areas in Riverside County (Water Systems Consulting, Inc., 2021). EMWD has a diverse portfolio of local and imported water supplies to deliver treated water to its customers. Local supplies include recycled water, potable groundwater, and desalinated groundwater. Imported water supplies are received from the Metropolitan Water District of Southern California.

Water use projections for 2025 -2045 are provided in the EMWD 2020 UWMP. Projected demands are based on planned development and land use of the service area. According to the 2020 UWMP, total water Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 186

Menifee Mayor and City Council
December 3, 2025
Page
778 of 966

CEQA Consistency Analysis and Checklist
City of Menifee Menifee 27 Residential Project
166
supply in 2025 is projected to be 145,930 acre-feet (AF) and would increase to 187,100 AF by 2045 (Water Systems Consulting, Inc., 2021) . Furthermore, estimated water supply and demand for EMWD is projected to be balanced during normal, single dry, and multiple dry years through 2045. The Water Service Reliability and Drought Risk Assessment Section of the UWMP also concludes that under dry and multiple dry year scenarios, stored groundwater and imported water from Metropolitan would be able to meet increased demands.

The proposed Project is consistent with the GP land use designation, which would be classified as residential use under the sectors analyzed within the UWMP. Therefore, water demands have been accounted for within the 2020 UWMP and t he water supplies are sufficient to meet demand within the City ’s service area, including the p roposed Project’s demand. In addition, the proposed Project would minimize water use by inclusion of low -flow plumbing and irrigation fixtures, pursuant to the California Title 24 requirements.

Therefore, the water supply would meet the water demand of the proposed Project during normal, dry, and multiple dry years and no new or substantially greater impacts would occur with implementation of the proposed Project beyond what was previously evaluated, identified, and disclosed in the GP EIR and the SP EIR.
c) Result in a determination by the wastewater treatment provider which serves or may serve the project that it has adequate capacity to serve the project’s projected demand in addition to the provider’s existing commitments?
No New Impact. This topic was evaluated in the GP EIR and was determined to be less than significant.

As described above, the proposed Project would be serviced by EMWD for wastewater services and is within the subservice area of the Perris Valley Regional Wastewater Reclamation Facility (RWRF). Sewage from the northern portion of the City of Menifee is conveyed to the Perris Valley RWRF, which has a treatment capacity of 22 million gallons per day (gpd), with a typical daily flow of 15.5 million gpd (EMWD, 2021).

Thus, the remaining daily capacity of the Perris Valley RWRF is approximately 6.5 million gpd. Based on the residential wastewater generation rate of 55 gallons per capita per day identified in Table 5.17-2 of the City of Menifee GP EIR, and the estimated population of 526 residents generated by the proposed Project (refer to Section 5.14, Population and Housing ), the proposed Project is anticipated to generate approximately 28,930 gpd of wastewater. Therefore, wastewater generated by the proposed Project would represent a fraction of the excess treatment capacity available at Perris Valley RWRF and there would be available capacity to accommodate the wastewater demand generated by the proposed Project.

As such, the proposed Project would not require new or expanded wastewater treatment facilities and no new or substantially greater impacts would occur with implementation of the proposed Project beyond what was previously evaluated, identified, and disclosed in the GP EIR and the SP EIR. d) Generate solid waste in excess of State or local standards, or in excess of the capacity of local infrastructure, or otherwise impair the attainment of solid waste reduction goals? No New Impact. This topic was evaluated in the GP EIR and was determined to be less than significant.

The proposed Project would generate solid waste during construction activities as well as during operation.

The City of Menifee contracts with Waste Management, Inc. to transport trash to the El Sobrante Landfill and the Badlands Landfill, described below.
• The El Sobrante Landfill is permitted to accept 16,054 tons per day of solid waste , operates six days a week, and is permitted to operate through 2051. In March 2025, the landfill had a peak disposal tonnage of 72,591 tons per week (12,099 tons per day) (CalRecycle, 2025a) . Thus, additional capacity is available for 3,956 tons of daily solid waste. • The Badlands Sanitary Landfill is permitted to accept 5,000 tons per day of solid waste, operates six days a week, and is permitted to operate through 2059. In 2023, the landfill had a n average Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 187

Menifee Mayor and City Council
December 3, 2025
Page
779 of 966

CEQA Consistency Analysis and Checklist
City of Menifee Menifee 27 Residential Project
167
daily tonnage of 2,848 tons (CalRecycle, 2025b). Thus, additional capacity is available for 2,152 tons of daily solid waste.

Assuming a conservative estimate based on average disposal tonnage, the two landfills have a combined additional capacity of 6,108 tons per day of solid waste.

Construction
The proposed Project does not involve demolition of existing structures; however, construction of the proposed Project would generate solid waste for landfill disposal from construction packaging and discarded materials. Utilizing a construction waste factor of 4.39 pounds per square foot (United State Environmental Protection Agency, 2009, p. 9), construction of the proposed Project would generate approximately 1,290 tons of waste during construction from packaging and discarded materials ([587,599 × 4.39 lbs/SF] ÷ 2,000 lbs/ton = 1,290 tons). However, Section 5.408.1 of the 2022 California Green Building Standards Code requires construction activities to recycle or reuse a minimum of 65 percent of the nonhazardous construction waste. Therefore, construction activities would generate approximately 451 tons of solid waste to be disposed of at the landfills . As described in Appendix A, Air Quality, Greenhouse Gas, and Energy Report, construction of the proposed Project is estimated to span 26 months, which would equate to approximately 0.58 tons of solid waste per day. As described above, the two landfills have a combined additional capacity of 6,108 tons per day of solid waste. Therefore, waste generated by construction of the Project would be accommodated for and impacts would be less than significant.

Operation
Solid waste generation rates included in the City of Menifee GP EIR states that for single family housing land uses the generation rate is 10 pounds per day per unit, or approximately 1.83 tons per year per unit. Thus, the proposed 192 single family residential units would generate approximately 351 tons of solid waste per year or 0.96 tons per day. However, at least 75 percent of the solid waste is required by AB 341 to be recycled, which would reduce the volume of landfilled solid waste to approximately 87.75 tons per year or

0.24 tons per day. As described above, the two landfills have a combined additional capacity of 6,108 tons per day of solid waste. Thus, the facilities would be able to accommodate the addition of 0.24 tons per day from operation of the proposed Project and impacts related to landfill capacity would be less than significant. Based on the foregoing analysis, no new or substantially greater impacts would occur with implementation of the proposed Project beyond what was previously evaluated, identified, and disclosed in the GP EIR and the SP EIR.
e) Comply with federal, State, and local statutes and regulations related to solid waste? No New Impact. This topic was evaluated in the GP EIR and was determined to be less than significant.

As described previously, the proposed Project would generate an increased amount of solid waste. All solid waste-generating activities within the City are subject to the requirements set forth in Section 5.408.1 of the California Green Building Standards Code that requires demolition and construction activities to recycle or reuse a minimum of 65 percent of the nonhazardous construction and demolitio n waste, and AB 341 that requires diversion of a minimum of 75 percent of operational solid waste.

The proposed Project would comply with all standards related to solid waste diversion, reduction, and recycling during Project construction and operation, which would be verified through the City development permitting process. Therefore, the Project would not result in significant impacts related to compliance with solid waste regulations and no new or substantially greater impacts would occur with implementation of the proposed Project beyond what was previously evaluated, identified, and disclosed in the GP EIR and the SP EIR.

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 188

Menifee Mayor and City Council
December 3, 2025
Page
780 of 966

CEQA Consistency Analysis and Checklist
City of Menifee Menifee 27 Residential Project
168
Conclusion
Regarding the issue area of utilities and service systems, the following findings can be made:
15183 Findings

1. No peculiar impacts to the Project or its site have been identified.

2. There are no significant effects that were not analyzed as part of the GP EIR.

3. There are no potentially significant off-site and/or cumulative impacts which were not discussed by the GP EIR.

4. No substantial new information has been identified which results in an impact which is more severe than anticipated by the GP EIR.

5. No Mitigation Measures related to utilities and service systems are contained within the GP EIR.

Additionally, no Mitigation Measures would be required because Project specific impacts would be less than significant.
15182 Findings
Based on the foregoing information, none of the conditions identified in State CEQA Guidelines Section 15162 that would trigger the need to prepare a subsequent or supplemental EIR or other environmental document to evaluate Project impacts or M itigation Measures exist regarding utilities and service systems .

There have not been (1) changes related to development of the Project site that involve new significant environmental effects or a substantial increase in the severity of previously identified effects; (2) substantial changes with resp ect to the circumstances under which development of the Project site is undertaken that require major revisions of the certified EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified effects; or (3) the availability of new information of substantial importance relating to significant effects or Mitigation Measures or alternatives that were not known and could not have been known when the certified SP EIR was certified as completed.

Because none of the conditions identified in State CEQA Guidelines Section 15162 would trigger the need to prepare a subsequent or supplemental EIR or other environmental document to evaluate Project impacts, State CEQA Guidelines 15182 also does not require additional environmental review and the Project is within the scope of the SP EIR.

Uniformly Applied Development Policies or Standards (DP/S) 2022 California Green Building Standards Code, Title 24, Part 11 (CALGreen). Section 5.408.1.1 Construction waste management plan. Newly constructed projects and additions and alterations to existing buildings shall recycle and/or salvage for reuse a minimum of 65 percent of the nonhazardous construction and demolition debris in accordance with Section 5.408.1.1.

GP Goals and Policies
None.

GP EIR Mitigation Measures
No Mitigation Measures are required.

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 189

Menifee Mayor and City Council
December 3, 2025
Page
781 of 966

CEQA Consistency Analysis and Checklist
City of Menifee Menifee 27 Residential Project
169

5.20. WILDFIRE
If located in or near State
responsibility areas or lands
classified as very high fire
hazard severity zones, would
the project:

Project
Impact
that is
Peculiar to
the Project
or the
Project
Site
Significant
Impact not
Analyzed
as
Significant
in the
Prior EIR
Potentially
Significant
Off-site or
Cumulative
Impact not
Discussed
in the prior
EIR
Adverse
Impact
More Severe
based on
Substantial
New
Information
No
New
Impact
Not
Previously
Analyzed
in the
Prior EIR
a) Substantially impair an
adopted emergency response
plan or emergency evacuation
plan?

b) Due to slope, prevailing
winds, and other factors,
exacerbate wildfire risks, and
thereby expose project
occupants to, pollutant
concentrations from a wildfire
or the uncontrolled spread of
a wildfire?

c) Require the installation or
maintenance of associated
infrastructure (such as roads,
fuel breaks, emergency water
sources, power lines or other
utilities) that may exacerbate
fire risk or that may result in
temporary or ongoing impacts
to the environment?

d) Expose people or structures
to significant risks, including
downslope or downstream
flooding or landslides, as a
result of runoff, post-fire slope
instability, or drainage
changes?

Summary of Impacts Identified in the GP EIR
The wildfire threshold questions listed above were not specifically addressed in the GP EIR as they were not a part of the CEQA Guidelines at the time the GP EIR was adopted. However, the GP EIR addressed wildland fire risks within Section 5.8, Hazards and Hazardous Materials.

The GP EIR found that a large portion of the City falls within Moderate, High, and Very High Fire Hazard Severity Zones (VHFHSZ) as designated by CAL FIRE. The GP would designate development adjacent to open space areas, which could pose wildfire risks. The GP EIR determined that the required use of fire - resistant building materials, implementation of fuel modification zones, and vegetation management around structures would reduce potential wildfire impacts. New development in wildland and urban -wildland interface areas would be required to comply with existing regulations, including the California Fire Code Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 190

Menifee Mayor and City Council
December 3, 2025
Page
782 of 966

CEQA Consistency Analysis and Checklist
City of Menifee Menifee 27 Residential Project
170
and California Building Code fire -resistant construction standards. The GP EIR concluded that compliance with these regulations would reduce wildfire risks to less-than-significant levels.

Summary of Impacts Identified in the SP EIR
The Menifee North Specific Plan Amendment No. 5, Addendum to EIR No. 329 discussed impacts related to wildfire under Section 4.22, Wildfire, pages 106 through 108.

The SP EIR was prepared prior to the inclusion of wildfire -specific thresholds in the CEQA Guidelines Appendix G checklist and did not directly analyze wildfire impacts. As such, the SP EIR did not evaluate potential impacts related to the installation or maintenance of infrastructure that could exacerbate wildfire risk or result in temporary or ongoing environmental effects, nor did it analyze the Project’s potential to impair an adopted emergency response or evacuation plan. Additionally, the SP EIR did n ot address the potential for post-fire slope instability or changes in drainage patterns.

Although wildfire-specific thresholds were not analyzed, the SP EIR included sufficient information regarding general hazards and land use compatibility to allow, through reasonable diligence, an understanding of how the SP would relate to fire risk, emergency access, and site design. As such, while not explicitly evaluated under current CEQA wildfire criteria, relevant considerations were available within the SP EIR to inform the public of potential hazard-related effects. The Menifee North Specific Plan Amendment No. 5, Addendum to SP EIR, determined that impacts would be less than significant with compliance to existing regulations.

Project-Specific Impacts
a) Substantially impair an adopted emergency response plan or emergency evacuation plan? Not Previously Analyzed in the Prior EIR. This topic was not evaluated in the GP EIR.

According to the Fire Hazard Severity Zone maps recommended by CAL FIRE on March 24, 2025, the Project site is not located within a State Responsibility Area (SRA) or near an area identified as a V HFHSZ (CAL FIRE, 2025). The Project site is, however, listed within a Local Responsibility Area (LRA), meaning the primary responsibility for preventing and suppressing wildfires is with the local agency. Additionally, as stated in Section 5.9, Hazards and Hazardous Materials, the proposed Project would not physically interfere with an adopted emergency response plan or emergency evacuation plan. The proposed Project does not include any characteristics (e.g., permanent road closures or long -term blocking of road access) that would substantially impair or otherwise conflict with an emergency response plan or emergency evacuation plan.

Further, the proposed Project would not obstruct or alter any transportation routes that could be used as evacuation routes during emergency events.

The proposed Project would provide adequate emergency access to the site via two new driveways along Palomar Road, which would connect to a 24 - to 28-foot-wide internal access way that would ensure two - way vehicle travel and emergency vehicle movements . Project driveways and internal access would be consistent with the City’s permitting procedures to meet the City’s design standards, stated in the Menifee Development Code Section 9.160.050, to ensure adequate emergency access and evacuation. The proposed Project would also be required to provide fire suppression facilities (e.g., hydrants and sprinklers). The Office of the Fire Marshal and/or Community Development Department would review the development plans as part of the permitting procedures to ensure adequate emergency access pursuant to the requirements in Section 503 of the California Fire Code (Title 24, California Code of Regulations, Part 9). As a result, the proposed Project would not impair an adopted emergency response plan or emergency evacuation plan .

Therefore, impacts would be less than significant and no new or substantially greater impacts would occur with implementation of the proposed Project beyond what was previously evaluated, identified, and disclosed in the GP EIR and the SP EIR.

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 191

Menifee Mayor and City Council
December 3, 2025
Page
783 of 966

CEQA Consistency Analysis and Checklist
City of Menifee Menifee 27 Residential Project
171
b) Due to slope, prevailing winds, and other factors, exacerbate wildfire risks, and thereby expose project occupants to, pollution concentrations from a wildfire or the uncontrolled spread of a wildfire?
Not Previously Analyzed in the Prior EIR. This topic was not evaluated in the GP EIR.

As described in the previous response, the Project site is not within or near an SRA or a Very High Fire Hazard Severity Zone ( VHFHSZ). The Project site is surrounded by residential land uses to the north and west, commercial to the south, and vacant and undeveloped land to the east. Therefore, the Project site and adjacent areas are predominately developed and do not contain factors that could exacerbate wildfire risks. The proposed Project would also be required to comply with the 2022 California Fire Cod e, 2022 California Building Code, and City of Menifee Municipal Code Chapter 8.20, Fire Code. The City of Menifee Fire Code provides building standards for access roads, building clearances and other fire -related requirements such as fire apparatus, construction materials and methods, and automatic sprinkler systems.

Compliance with these requirements would be verified by the City prior to the issuance of building permits for the proposed Project consistent, with GP Policy S- 4.9 and Policy S -4.1. As such, the proposed Project would not exacerbate wildfire risks as compared to existing conditions because it is representative of existing development in the area. Thus, impacts related to factors that would expose project occupants to pollutant concentrations from a wildfi re or the uncontrolled spread of a wildfire would not occur. Based on the foregoing analysis, no new or substantially greater impacts would occur with implementation of the proposed Project beyond what was previously evaluated, identified, and disclosed in the GP EIR and the SP EIR. c) Require the installation or maintenance of associated infrastructure (such as roads, fuel breaks, emergency water sources, power lines, or other utilities) that may exacerbate fire risk or that may result in temporary or ongoing impacts to the environment? Not Previously Analyzed in the Prior EIR. This topic was not evaluated in the GP EIR.

As described in the previous responses, the Project site is not within or near an SRA or a VHFHSZ and is located within a predominantly developed setting. The proposed Project does not require the installation or maintenance of associated infrastructure (including roads, fuel breaks, emergency water sources, power lines, or other utilities) that would exacerbate fire risk or that would result in impacts to the environmen t.

Although the proposed Project includes new driveways within the Project site, the proposed Project does not include any changes to public or private roadways that would exacerbate fire risk or that would result in impacts to the environment. Although utility improvements, including domestic water, sanitary sewer, and storm drain lines proposed as part of the proposed Project would be extended throughout the Project site, these utility improvements would be underground and would not exacerbate fire risk. Project design and implementation of utility improvements would be reviewed and approved by the City as part of the Project approval process to ensure the proposed Project is compliant with all applicable design standards and regulations. Therefore, the proposed Project would not include infrastructure (such as roads, fuel breaks, emergency water sources, power lines, or other utilities), that would exacerbate fire risk or that would result in impacts to the environment . Based on the foregoing analysis, no new or substantially greater impacts would occur with implementation of the proposed Project beyond what was previously evaluated, identified, and disclosed in the GP EIR and the SP EIR.
d) Expose people or structures to significant risks, including downslope or downstream flooding or landslides, as a result of runoff, post-fire slope instability, or drainage changes? Not Previously Analyzed in the Prior EIR. This topic was not evaluated in the GP EIR.

As described in the previous responses, the Project site is not within or near an SRA or VHFHSZ. As discussed in Section 5.10, Hydrology and Water Quality , the proposed Project would not result in increased impacts related to flooding or drainage changes. Also as discussed in Section 5. 7, Geology and Soils , the Project Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 192

Menifee Mayor and City Council
December 3, 2025
Page
784 of 966

CEQA Consistency Analysis and Checklist
City of Menifee Menifee 27 Residential Project
172
site is relatively flat and is not susceptible to landslides. In addition, the Project site is located in a flat area that does not contain or is adjacent to large slopes, and the proposed Project would not generate large slopes. Furthermore, the proposed Project includes installation of on-site drainage improvements.

Therefore, the proposed Project would not result in impacts related to significant risks, including downslope or downstream flooding or landslides, as a result of runoff, post-fire slope instability, or drainage changes.

Based on the foregoing analysis, no new or substantially greater impacts would occur with implementation of the proposed Project beyond what was previously evaluated, identified, and disclosed in the GP EIR and the SP EIR.

Conclusion
Regarding the issue area of wildfire, the following findings can be made:
15183 Findings

1. No peculiar impacts to the Project or its site have been identified.

2. There are no significant effects that were not analyzed as part of the GP EIR.

3. There are no potentially significant off-site and/or cumulative impacts which were not discussed by the GP EIR.

4. No substantial new information has been identified which results in an impact which is more severe than anticipated by the GP EIR.

5. No Mitigation Measures related to wildfire are contained within the GP EIR. Additionally, no Mitigation Measures would be required because Project specific impacts would be less than significant. 15182 Findings
Based on the foregoing information, none of the conditions identified in State CEQA Guidelines Section 15162 that would trigger the need to prepare a subsequent or supplemental EIR or other environmental document to evaluate Project impacts or Mitigation Measures exist regarding wildfire. There have not been (1) changes related to development of the Project site that involve new significant environmental effects or a substantial increase in the severity of previously identified effects; (2) substantial changes with respect to the circumstances under which development of the Project site is undertaken that require major revisions of the certified EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified effects; or ( 3) the availability of new information of substantial importance relating to significant effects or Mitigation Measures or alternatives that were not known and could not have been known when the certified SP EIR was certified as completed.

Because none of the conditions identified in State CEQA Guidelines Section 15162 would trigger the need to prepare a subsequent or supplemental EIR or other environmental document to evaluate Project impacts, State CEQA Guidelines 15182 also does not require additional environmental review and the Project is within the scope of the SP EIR.

Uniformly Applied Development Policies or Standards (DP/S) City of Menifee Municipal Code Chapter 8.20: Fire Code. As listed previously in Section 5.9, Hazards and Hazardous Materials.

GP Goals and Policies
• Policy S-4.9: Ensure all new development and/or redevelopment within the SRA will comply with all provisions of Title 14, CCR, division 1.5, chapter 7, subchapter 3, article 3 (commencing with section 1299.01) (Fire Hazard Reduction Around Buildings and Structures Regulations) for SRAs and VHFHSZs.

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 193

Menifee Mayor and City Council
December 3, 2025
Page
785 of 966

CEQA Consistency Analysis and Checklist
City of Menifee Menifee 27 Residential Project
173
• Policy S-4.1: Require fire-resistant building construction materials, the use of vegetation control methods, and other construction and fire prevention features to reduce the hazard of wildland fire.

Ensure all new development and/or redevelopment in the LRA and VHFHSZ will comply with the California Fire Code (CFC) and California Building Code (CBC). All new development within the LRA Very High Fire zone will comply with Chapter 49 of the California Fire Code and Chapter 7A of the California Building Code.

GP EIR Mitigation Measures
No Mitigation Measures related to wildfire are included in the GP EIR.

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 194

Menifee Mayor and City Council
December 3, 2025
Page
786 of 966

CEQA Consistency Analysis and Checklist
City of Menifee Menifee 27 Residential Project
174

6. DOCUMENT PREPARERS AND CONTRIBUTORS
Lead Agency:

City of Menifee Planning Division
29844 Haun Road
Menifee, CA 92586
CEQA Document Preparer:

EPD Solutions, Inc.

Konnie Dobreva, Vice President of Environmental Planning Terrance Smalls, Environmental Principal Planner
Sam Kelley, Assistant Planner

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 195

Menifee Mayor and City Council
December 3, 2025
Page
787 of 966

CEQA Consistency Analysis and Checklist
City of Menifee Menifee 27 Residential Project
175

7. REFERENCES
CAL FIRE. (2025). Fire Hazard Severity Zones. Retrieved from https://osfm.fire.ca.gov/what-we- do/community-wildfire-preparedness-and-mitigation/fire-hazard-severity-zones California Department of Conservation. (2025). EQ Zapp: California Earthquake Hazards Zone Application.

Retrieved from https://www.conservation.ca.gov/cgs/geohazards/eq-zapp California Department of Finance. (2025, January). E-5 Population and Housing Estimates for Cities, Counties, and the State, January 2021-2025, with 2020 Benchmark. Retrieved from https://dof.ca.gov/forecasting/demographics/estimates/e-5-population-and-housing-estimates- for-cities-counties-and-the-state-2020-2025/
California Department of Transportation. (2025). Caltrans State Scenic Highway System Map. Retrieved from
https://www.google.com/maps/d/edit?mid=1McdQuTKwsdoQlY89PY5b0UVEflxyNkw&ll=34.13 281149713324%2C-117.7868466979627&z=13
CalRecycle. (2025a). SWIS Facility/Site Documents El Sobrante Landfill (33-AA-0217). Retrieved from https://www2.calrecycle.ca.gov/SolidWaste/SiteDocument/Index/2402 CalRecycle. (2025b). SWIS Facility/Site Documents Badlands Sanitary Landfill (33-AA-0006). Retrieved from https://www2.calrecycle.ca.gov/SolidWaste/SiteDocument/Index/2367 CDWR. (2025). Dam Breach Inundation Map. Retrieved from https://fmds.water.ca.gov/webgis/?appid=dam_prototype_v2 City of Menifee. (2024). Menifee North Specific Plan. Retrieved from https://www.cityofmenifee.us/DocumentCenter/View/20642/Menifee-North-Specific-Plan- Amendment-No-5
City of Menifee. (2025). City of Menifee Municipal Code. https://codelibrary.amlegal.com/codes/menifee/latest/menifee_ca/0-0-0-29876 Department of Finance. (2025). E-5 Population and Housing Estimates for Cities, Counties, and the State, 2021-2025. Retrieved from https://dof.ca.gov/forecasting/demographics/estimates/e-5- population-and-housing-estimates-for-cities-counties-and-the-state-2020-2025/ Department of Toxic Substances Control. (2021). EnviroStor Database. Retrieved July 27, 2021, from Department of Toxic Substances Control: https://www.envirostor.dtsc.ca.gov/public/ EMWD. (2021). Perris Valley Regional Water Reclamation Facility. Retrieved from https://www.emwd.org/sites/main/files/file-attachments/pvrwrffactsheet.pdf?1620227213 EPD Solutions, Inc. (2025a). Air Quality, Energy, and Greenhouse Gas Impact Analysis for Menifee 27 Project. Appendix A.

EPD Solutions, Inc. (2025b). Vehicle Miles Traveled (VMT) Scoping Form. Appendix I.

Executive Department State of California. (2005). Executive Order S-3-05. Retrieved from https://www.library.ca.gov/wp-content/uploads/GovernmentPublications/executive-order- proclamation/5129-5130.pdf
FEMA. (2024). FEMA's National Flood Hazard Layer Viewer. Retrieved from https://hazards- fema.maps.arcgis.com/apps/webappviewer/index.html?id=8b0adb51996444d4879338b5529 aa9cd
GeoTek, Inc. (2024). Geotechnical and Infiltration Evaluation. Appendix D.

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 196

Menifee Mayor and City Council
December 3, 2025
Page
788 of 966

CEQA Consistency Analysis and Checklist
City of Menifee Menifee 27 Residential Project
176
LSA. (2025). Noise and Vibration Impact Analysis. Appendix H.

JLC Engineering and Consulting, Inc. (2025a). Preliminary Hydrology Report. Appendix F.

JLC Engineering and Consulting, Inc. (2025b). Preliminary Water Quality Management Plan. Appendix G.

Psomas. (2025a). Habitat Assessment. Appendix B.

Psomas. (2025b). Phase I Archaeological And Paleontological Resources Study. Appendix C.

Riverside County ALUC. (2010). Riverside County Airport land Use Compatability Plan Document. Retrieved from chrome-
extension://efaidnbmnnnibpcajpcglclefindmkaj/https://rcaluc.org/sites/g/files/aldnop421/files/ 2023-06/Perris%20Valley.pdf
SCAQMD. (2008). Final Localized Significance Threshold Methodology . Retrieved from https://www.aqmd.gov/docs/default-source/ceqa/handbook/localized-significance- thresholds/final-lst-methodology-document.pdf?sfvrsn=8c641d61_2 SCAQMD. (2010). Minutes for the GHG CEQA Significance Threshold Stakeholder Working Group #15.

Retrieved from https://www.aqmd.gov/docs/default-source/ceqa/handbook/greenhouse-gases- (ghg)-ceqa-significance-thresholds/year-2008-2009/ghg-meeting-15/ghg-meeting-15- minutes.pdf
SCAQMD. (n.d.-a). Fact Sheet for Applying CalEEMod to Localized Significance Thresholds. Retrieved from https://www.aqmd.gov/docs/default-source/ceqa/handbook/localized-significance- thresholds/caleemod-guidance.pdf
South Coast Air Quality Management District. (n.d.-b). RULE 1113. Architectural Coatings. Retrieved from http://www.aqmd.gov/rules/reg/reg11/r1113.pdf
South Coast Air Quality Management District. (n.d.-c). RULE 1186. PM10 Emissions From Paved and Unpaved Roads, and Livestock Operations. Retrieved from http://www.aqmd.gov/docs/default-source/rule- book/reg-xi/rule-1186-1-less-polluting-sweepers.pdf?sfvrsn=4 South Coast Air Quality Management District. (n.d.-d). RULE 403. Fugitive Dust. Retrieved from http://www.aqmd.gov/docs/default-source/rule-book/rule-iv/rule-403.pdf?sfvrsn=4 South Coast Air Quality Management District. (n.d.-e). RULE 431.2. Sulfur Content of Liquid Fuels. Retrieved from http://www.aqmd.gov/docs/default-source/rule-book/rule-iv/rule-431-2.pdf?sfvrsn=4 Southern California Association of Goverments. (2024). Demographics and Growth Forecasts. Retrieved from https://scag.ca.gov/sites/main/files/file-attachments/23-2987-tr-demographics-growth- forecast-final-040424.pdf?1712261839
Stantec Consulting Services Inc. (2024). Phase I Environmental Site Assessment. Appendix E.

United States Environmental Protection Agency. (2009). Municipal Solid Waste Generation, Recycling, and Disposal in the United States: Facts and Figures for 2009 (p. 9). Retrieved from https://www.epa.gov/sites/default/files/2017-
09/documents/estimating2003buildingrelatedcanddmaterialsamounts.pdf Water Systems Consulting, Inc. (2021, July). Urban Water Management Plan. Retrieved from Eastern Municipal Water District: https://www.emwd.org/sites/main/files/file- attachments/urbanwatermanagementplan_0.pdf?1625160721

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 197

Menifee Mayor and City Council
December 3, 2025
Page
789 of 966

CEQA Consistency Analysis and Checklist
City of Menifee Menifee 27 Residential Project
177
End of document.

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 198

Menifee Mayor and City Council
December 3, 2025
Page
790 of 966

CITY OF MENIFEE

APPEAL APPLICATION
Decision to be appealed: Tentative Tract Map
No. 39115 “Menifee 27"

APPELLANT/REPRESENTATIV: Supporters Alliance for Environmental Responsibility (“SAFER”)

PHONE NO. 510-836-4200 FAX NO. 510-836-4205 E-MAIL [email protected]

ADDRESS 1939 Harrison Street, Suite 150 Oakland CA 94612

STREET CITY STATE ZIP

PROPERTY OWNER Taylor Brian
(if different) LAST FIRST MI.

PHONE NO. 805-305-3651 FAX NO. E-MAIL [email protected]

ADDRESS 9860 Irvine Center Drive Irvine CA 92618

STREET CITY STATE ZIP

Name of Project, APN/Address: Menifee 27, The Project site is located north of State Route 74 (SR-74), west of Palomar Road, east of Antelope Road, and south of Watson Road in the City of Menifee, County of Riverside (APN 329-110-024, -028, -041, -042, and - 043).

Appealing the decision of (Specify Community Development Director, Building and Safety Director City Manager, Planning Commission): Planning Commission

Action and Date: Planning Commission approval of Tentative Tract Map No. 39115/ Menifee 27 Residential Project

Explain specify what action or decision is being appealed: SAFER objects to the City’s decision to exempt the Project from environmental review under the California Environmental Quality Act (“CEQA”) based on CEQA Section 15182 (“Projects Pursuant to a Specific Plan”) and Section 15183 (“Projects Consistent with a Community Plan or Zoning”) exemptions. Exempting the Project from CEQA based on Section 15182 & Section 15183 violates CEQA because terms of the Section 15182 & Section 15183 exemption do not apply.

Do you have additional evidence not already presented? Yes X No. If Yes, please attach.

What result to you want? SAFER requests that an initial study be conducted and a CEQA document prepared to analyze and mitigate the Project’s environmental impacts. The Planning Commission should decline to approve the Project until proper CEQA review is completed.

Applicant’s Signature ______________________ Date: November 3 , 2025

Owner Certification: I certify under the penalty of the laws of the State of California that I am the property owner of the property that is the subject matter of this appeal application. I am authorizing and hereby do consent to the filing of this application and acknowledge that the final approval by the City of Menifee, if any, may result in restrictions, limitations and construction obligations being imposed on this real property.

Owner’s Signature: Not Applicable. The appellant is not the owner. Date:

Print Name:

Received 11.3.25
RB
PLN25-0193
PAID 11.3.25
Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 199

Menifee Mayor and City Council
December 3, 2025
Page
791 of 966

Written authorization from the legal property owner is required. An authorized agent for the owner must attach a notarized letter of authorization from the legal property owner.

No application will be accepted until is complete and the fee paid.

Once complete, you will receive confirmation and a hearing date as well as additional appeal information. For questions, please contact the City Clerk at (951) 672-6777.

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 200

Menifee Mayor and City Council
December 3, 2025
Page
792 of 966

RESOLUTION NO. 25-______

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MENIFEE DENYING APPEAL NO. PLN25-0193, DETERMINING THE PROJECT

IS EXEMPT FROM THE CALIFORNIA ENVIRONMENTAL QUALITY
ACT (CEQA) PER SECTIONS 15182 (“PROJECTS PURSUANT TO A
SPECIFIC PLAN”) AND 15183 (“PROJECTS CONSISTENT WITH A
COMMUNITY PLAN OR ZONING”), AND APPROVING TENTATIVE
TRACT MAP (TTM) NO. 39115 (PLN24-0230) AND PLOT PLAN NO.

PLN24-0254
WHEREAS, on November 25, 2024, the applicant, Brian Taylor (Taylor and Clark), representing Melia Homes (Applicant), filed a formal Senate Bill (SB) 330 application with the City of Menifee for the approval of Tentative Tract Map (TTM) No. 39115 (PLN24-0230) and Plot Plan (PP) No. PLN24-0230 for a 192 single-family residential lot subdivision on an approximately 27.35-acre project site (APN 329-110- 024, -028, -041, -042, and -043); and
WHEREAS, pursuant to the requirements of the California Environmental Quality Act (CEQA), the City of Menifee determined that no further environmental analysis was required pursuant to Section 15182 and 15183 of the CEQA Guidelines; and WHEREAS, on October 22, 2025, at a legally noticed public hearing, the Planning Commission voted 5-0 to approve TTM No. 39115 (PLN24-0230) and PP No.

PLN24-0254; and
WHEREAS, on November 3, 2025, an application to appeal Planning Commission approval of TTM No. 39115 (PLN24-0230) and PP No. PLN24-0254 was submitted by the Appellant, Supporters Alliance for Environmental Responsibility (SAFER); and
WHEREAS, on December 3, 2025, the City Council of the City of Menifee held a public hearing on the appeal of the Planning Commission’s approval of TTM No. 39115 (PLN24-0230), PP No. PLN24-0254 and Resolution No. PC25-675, considered all public testimony as well as all materials in the staff report and accompanying documents for the appeal, which hearing was publicly noticed by a publication in The Press Enterprise, a newspaper of general circulation, an agenda posting, notice to property owners within 300 feet of the project boundaries, on-site posting at the project site, and to persons requesting public notice.

NOW THEREFORE, the City Council of the City of Menifee hereby approves the following:

Section 1:The City of Menifee’s City Council hereby makes the following findings for TTM No. 39115 (PLN24-0230) in accordance with Title 7, Article 2, Chapter 7.20.090 “Findings for Approval for Tentative Maps” of the City of Menifee Subdivision Code:

Finding 1 - The proposed subdivision and the design and improvements of the subdivision is consistent with the General Plan, any applicable specific plan, and the Menifee Municipal Code (MMC).

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 201

Menifee Mayor and City Council
December 3, 2025
Page
793 of 966

Appeal of TTM No. 39115 “Menifee 27”
December 3, 2025

Page 2 of 6 ends

The Project site has a General Plan Land Use and Zoning designation of Specific Plan (SP); and more specifically, the project is located within Planning Areas (PA) 7A and 7B of the Menifee North Specific Plan (SP No. 260). According to the SP, the combination of the two planning areas has a target residential density of 172 total dwelling units or 6.32 dwelling units per acre (Medium or Medium- High Density).

Pursuant to MMC Section 9.180 and California Government Code Section 65915, the Project seeks to utilize California’s State Density Bonus Law (DBL) by including affordable housing units. As part of the proposed Project’s commitment to affordable housing, nine units (5% of the base density) would be reserved for very low-income households, qualifying the proposed Project for benefits under DBL. These benefits could include a 20% density bonus, development standard waivers or reductions, one concession/incentive, and the use of State Density Bonus parking ratios as permitted under the City of Menifee Development Code Chapter 9.180.

The Project proposes to subdivide the 27.35-acre (27.14 net acres) site into 192 single-family residential lots, resulting in an overall proposed density of 7.07 dwelling units per acre, utilizing a 12% density bonus.

MMC Section 9.180 and California Government Code Section 65915 allow for projects that are utilizing density bonus to also request unlimited waivers of development standards if those development standards have the effect of physically precluding the construction of a housing development that provides for 5% of the residential units as very low-income affordable units. The Project proposes 5% or nine of the residential units (of the base density of 172 units) as very low-income affordable and therefore can request development standard waivers.

The Project is consistent with the following City of Menifee General Plan policies:
LU-1.2 Provide a spectrum of housing types and price ranges that match the jobs in the city and make it possible for people to live and work in Menifee and maintain a high quality of life.

The subdivision proposes two housing product types within the two distinct communities. To help reduce the housing costs, the Project includes nine very-low-income units.
Policy HE 1.2 Support residential growth and infill in specific plan areas and along corridors where comprehensive neighborhood planning is completed, and adequate infrastructure is planned.

The Project includes infill development within a Specific Plan area.

The Project will be responsible for extending existing utility infrastructure to the Project site.

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 202

Menifee Mayor and City Council
December 3, 2025
Page
794 of 966

Appeal of TTM No. 39115 “Menifee 27”
December 3, 2025

Page 3 of 6 ends

Policy HE 1.4 Provide development standards and incentives to facilitate a range of housing, such as single-family dwellings, apartments, senior housing, and other housing types in rural, suburban and urban settings.

The Project is a smaller lot subdivision, providing a unique lot size to the area. The Project includes nine affordable housing units at the very-low- income level.
Policy C-1.1 Require roadways to: Comply with federal, state and local design and safety standards.

The TTM proposes improvements for roadways, including Palomar Road, which are consistent with the City’s General Plan and the City’s Public Works and Engineering Department Standard Details. Additionally, the internal tract streets will be privately maintained.
Policy CD-1.3 Strengthen the identity of individual
neighborhoods/communities with entry monuments, flags, street signs, and/or special tree streets, landscaping, and lighting.

The Project will include enhancements at the entry off Palomar Road including decorative pavers, landscaped median, entry identification sign along with dedicated amenities for the residents of the tract including a recreation center, linear paseo and tot lot. The conceptual landscape plan includes the entire tract to provide a consistent and unique landscape plan for the entire community.

Finding 2 - The site is physically suitable for the type of development and the proposed land use of the development.

The site is bound by residential development to the north and west, vacant land to the east and commercial uses to the south. The site is relatively flat and is suitable for residential tract development, while also being compatible with surrounding land uses. Additionally, the site has been designed to be physically suitable to accommodate the development with the proposed number of lots as well as all other proposed improvements. Therefore, the site is considered physically suitable for the type of development and the proposed land use of the site.

The Project has been reviewed by the land development departments to ensure compliance with applicable regulations, including, but not limited to City of Menifee Community Development, Engineering and Public Works, and the Office of the Fire Marshal. These Departments have also provided conditions of approval as appropriate to ensure compliance with applicable regulations.

Finding 3 - The design of the subdivision or the proposed improvements are not likely to cause substantial environmental damage or substantially and avoidably injure fish or wildlife or their habitat:

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 203

Menifee Mayor and City Council
December 3, 2025
Page
795 of 966

Appeal of TTM No. 39115 “Menifee 27”
December 3, 2025

Page 4 of 6 ends

The City of Menifee has two active conservation plans within the City’s boundary, the Western Riverside County Multiple Species Habitat Conservation Plan (MSHCP), and the Stephen’s Kangaroo Rat Habitat Conservation Plan (SKR-HCP). The subject site is within the jurisdiction of the SKR-HCP and the Western Riverside County MSHCP. The Project site is located inside the SKR-HCP (Dipodomys stephensi) Fee Area. The proposed Project is located within the boundaries of the Western Riverside County MSHCP; however, the Project is not located within a Criteria Cell or Cell Group. The biology report prepared for this Project notes the Project’s consistency with the findings of the MSHCP. The Project will be subject to the payment of fees consistent with MMC Chapter 17.03 as adopted by the City of Menifee. Therefore, the Project will not conflict with the provisions of the adopted HCP, Natural Conservation Community Plan, or other approved local, regional, or state conservation plan and the impact is considered less than significant.

A memorandum and technical studies were prepared pursuant to Section 15183 (“Projects Consistent with a Community Plan or Zoning”) which concludes that further environmental analysis is not necessary as the Project is consistent with the General Plan and Zoning Code and was previously analyzed in the General Plan Environmental Impact Report (EIR), therefore the City of Menifee has determined that no further environmental analysis is required and the Project is not likely to cause significant environmental impacts and will avoid injuries to fish or wildlife and their habitat.

Finding 4 - The design of the subdivision and the type of improvements are not likely to cause serious public health problems.

The public health, safety and general welfare are protected through Project design, conditions of approval. The site is bounded by residential developments to the north and west, vacant land to the east and commercial uses to the south.

The Project has been reviewed and conditioned by the City of Menifee Community Development, Engineering, and Police Departments, and the Office of the Fire Marshal to ensure that it will not create conditions materially detrimental to the surrounding uses, nor will be detrimental to the public health, safety and general welfare or incompatible with other properties or land uses in the Project vicinity.

Finding 5 - The design of the subdivision and the type of improvements will not conflict with easements acquired by the public at large for access through or use of property within the proposed subdivision, or the design of the alternate easements which are substantially equivalent to those previously acquired by the public will be provided.

The subdivision makes provisions for all existing and future easements for all utilities and public use purposes. Therefore, no conflicts with easements will occur with the design of the subdivision. A substantial Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 204

Menifee Mayor and City Council
December 3, 2025
Page
796 of 966

Appeal of TTM No. 39115 “Menifee 27”
December 3, 2025

Page 5 of 6 ends

drainage easement along the western project boundary was carefully considered when designing the Project.

Section 2: The City of Menifee’s City Council hereby makes the following findings for PP No. PLN24-0254 in accordance with Title 9, Article 2, Chapter

9.80.070 “Findings for Approval” of the MMC:

Finding 1 - The proposed project is consistent with the adopted General Plan and any applicable specific plan.

The Project site has a General Plan Land Use and Zoning designation of Specific Plan (SP); and more specifically, the project is located within PA 7A and 7B of SP No. 260. According to the SP, the combination of the two planning areas has a target residential density of 172 total dwelling units or 6.32 dwelling units per acre (Medium or Medium-High Density).

Pursuant to MMC Section 9.180 and California Government Code Section 65915, the Project seeks to utilize California’s State DBL by including affordable housing units. As part of the proposed Project’s commitment to affordable housing, nine units (5% of the base density) would be reserved for very low-income households, qualifying the proposed Project for benefits under DBL. These benefits could include a 20% density bonus, development standard waivers or reductions, one concession/incentive, and the use of State Density Bonus parking ratios as permitted under the City of Menifee Development Code Chapter 9.180.

The Project applicant proposes to subdivide the 27.35-acre site into 192 single-family residential lots, resulting in an overall proposed density of

7.02 dwelling units per acre, utilizing 12% density bonus.

The proposed Project is consistent with the General Plan, Specific Plan and California Government Code Section 65915 and the California State Density Bonus Law.

Finding 2 - The proposed project meets all applicable standards for development and provisions of this Title.

The Project site has a General Plan Land Use and Zoning designation of Specific Plan (SP). The Project is seeking waivers of certain development standards in the SP, as detailed in the staff report. The waiver requests are allowed per the MMC (Chapter 9.180) and California Government Code Section 65915 - the California State DBL. The Project is consistent with local and state law.

Finding 3 - The establishment, maintenance or operation of the proposed project will not be detrimental to the health, safety, or general welfare of persons residing or working in the neighborhood of such use or to the general welfare of the City.

The public health, safety and general welfare are protected through Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 205

Menifee Mayor and City Council
December 3, 2025
Page
797 of 966

Appeal of TTM No. 39115 “Menifee 27”
December 3, 2025

Page 6 of 6 ends

Project design, the environmental analysis and conditions of approval.

The site is bounded by residential developments to the north and west, vacant land to the east and commercial uses to the south. The Project has been designed to be compatible with the surrounding land uses.

The Project has been reviewed and conditioned by the City of Menifee Community Development, Engineering, and Police Departments, and the Office of the Fire Marshal to ensure that it will not create conditions materially detrimental to the surrounding uses, nor will be detrimental to the public health, safety and general welfare or incompatible with other properties or land uses in the Project vicinity.

BE IT FURTHER RESOLVED, The City Council of the City of Menifee makes the following findings:

1. That the City Council determine the “Findings” set out above are true and correct.

2.That the Project is in compliance with the Menifee North Specific Plan, City of Menifee General Plan and its adopted EIR and no further environmental analysis is required as the Project is exempt from CEQA pursuant to Sections 15182 and 15183 of the CEQA Guidelines.

3. That the facts presented within the public record and within this resolution provide a basis to deny the appeal and approve TTM No. 39115 (PLN24- 0230) and PP No. PLN24-0230 subject to the Conditions of Approval set forth in Exhibit “A” to this Resolution.

4. The documents and materials that constitute the record of proceedings on which this Resolution has been based are located at the Community Development Department – Planning Division, 29844 Haun Road, Menifee, CA 92586. This information is provided in compliance with Public Resources Code section 21081.6.

PASSED, APPROVED AND ADOPTED this 3rd day of December 2025. _________________________
Bob Karwin, Mayor Pro Tem
Attest:
_________________________________
Stephanie Roseen, City Clerk
Approved as to form:
_________________________________
Jeffrey Melching, City Attorney
Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 206

Menifee Mayor and City Council
December 3, 2025
Page
798 of 966

EXHIBIT “A”

CONDITIONS OF APPROVAL
Planning Application No.: Tentative Tract Map No. 39115 (PLN24-0230) and Plot Plan No.

PLN24-0254 – “Menifee 27” SB330 Project
Project Description: Tentative Tract Map No. 39115 (PLN24-0230) and Plot Plan No.

PLN24-0254 proposes a subdivision of 27.35 gross acres into 192 single-family residential lots resulting in an overall proposed density of 7.02 dwelling units per gross acre (7.07 net). The project site is located within Planning Areas 7A and 7B of the Menifee North Specific Plan (SP No. 260). The project qualifies for and utilizes Density Bonus Law (DBL) as 5% of the base density (base density 172 units) or nine units would be restricted to very low-income units; in exchange for providing the very low-income units, the project qualifies for a 20% density bonus, and development standard waivers and concessions (or incentives).

The project includes two product/lot types: Planning Area 7A consists of 75 lots and Planning Area 7B consists of 117 lots. Unit sizes range from 2,111 square feet to 3,025 square feet. Each lot or unit includes a two-car garage (min. 400 square feet), and along with the 135 identified surface parking stalls, a total of 519 parking spaces are being proposed (exclusive of driveway parking in Planning Area 7A).

Primary access is provided via two driveways along Palomar Road.

The project proposes two open space amenity areas: an approx. 17,640 square foot recreation center with pool and an approx. 11,000 square foot tot lot, as well as two open space basin areas (41,358 square feet and 93,842 square feet).

The site is generally located north of HWY 74, west of Palomar Road, east of Antelope Road and south of Watson Road.

Assessor's Parcel No.:329-110-024, 329-110-028, 329-110-041, 329-110-042 and 329- 110-043
MSHCP Category:Residential density less than 8 du/acre (fee not vested by SB 330) DIF Category:Single-Family Residential
TUMF Category:Determined by Western Riverside Council of Governments Quimby Category:Single-Family Residential
PC Approval Date:October 22, 2025
CC Approval Date:December 3, 2025

Page 1 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 207

Menifee Mayor and City Council
December 3, 2025
Page
799 of 966

Expiration Date:December 3, 2028
Within 48 Hours of the Approval of This Project
1Indemnification. Within 48 hours of project approval, the Applicant/developer shall indemnify, defend, and hold harmless the City of Menifee and its elected city council, appointed boards, commissions, committees, officials, employees, volunteers, contractors, consultants, and agents from and against any and all third party claims, liabilities, losses, fines, penalties, and expenses, including without limitation litigation expenses and attorney’s fees, arising out of either the City’s approval of the Project or actions related to the Property or the acts, omissions, or operations of the applicant/developer and its directors, officers, members, partners, employees, agents, contractors, and subcontractors of each person or entity comprising the applicant/developer with respect to the ownership, planning, design, construction, and maintenance of the Project and the Property for which the Project is being approved.
2Filing Notice of Exemption. Within 48 hours of project approval, the Planning Division will determine the appropriate fees for the Notice of Exemption (NOE) filing and request the payment of fees to the City of Menifee in the form of a check or cash. Upon receipt of payment, the Planning Division will file the NOE with the relevant agencies as required under Public Resources Code, California Code of Regulations and California Fish and Game Code.

Page 2 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 208

Menifee Mayor and City Council
December 3, 2025
Page
800 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 209

Menifee Mayor and City Council
December 3, 2025
Page
801 of 966

Section I: Community Development Department
Section II: Engineering/Public Works Department
Section III: Building and Safety Department
Section IV: Riverside County Fire Department
Section V: Riverside County Department of Environmental Health

Page 3 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 210

Menifee Mayor and City Council
December 3, 2025
Page
802 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 211

Menifee Mayor and City Council
December 3, 2025
Page
803 of 966

Section I:

Community Development
Department

Page 4 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 212

Menifee Mayor and City Council
December 3, 2025
Page
804 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 213

Menifee Mayor and City Council
December 3, 2025
Page
805 of 966

GENERAL CONDITIONS

1. Senate Bill SB330. Tentative Tract Map No. PLN24-0230 (Tentative Tract Map No. 39115) and Plot Plan No. PLN24-0254 – “Menifee 27”, is subject to the requirements of Senate Bill 330 Housing Crisis Act of 2019 (SB330). This bill freezes Development Impact and User Fees to those in effect at the time the SB330 application was deemed submitted unless otherwise noted in SB330.

The date the SB330 Preliminary application was submitted is November 25, 2024. Per SB330, if construction has not commenced within 2.5 years of the date of Final Approval as defined in Government Code section 65589.5(o) or otherwise noted in SB330, or otherwise extended by the State, this condition becomes null and void. As of the aforementioned dates this vesting becomes null and void should construction not commence, all current City of Menifee fees are applicable to this project. Government Code section 65589.5, subdivision (o).

2. Compliance with CEQA Guidelines Section 15182/15183 Memorandum.

The project and all subsequent projects within this site shall comply with all requirements identified within the CEQA Guidelines Section 15182/15183 Memorandum dated September 2025.

3. Exhibits. The project shall be constructed as approved, and as shown in the attachments to the accompanying staff report. The project shall be in compliance with City of Menifee Municipal Code. Any subsequent changes shall be processed per Menifee Municipal Code Section 9.30.120 Modifications to Previously Approved Permits.

4. Mitigation Monitoring. The applicant shall comply with, prepare and submit a written report to the Community Development Director demonstrating compliance with those conditions of approval and mitigation measures of this tract map which must be satisfied prior to the issuance of a grading permit for review and approval. The Community Development Director may require inspection or other monitoring to ensure such compliance.

5. Ninety (90) Days. The applicant has ninety (90) days from the date of approval of these conditions to protest the imposition of any and all fees, dedications, reservations and/or other exactions imposed on this project as a result of this approval or conditional approval of this project per Government Code Section 66020.

6. Subsequent Submittals. Any subsequent submittals required by these Conditions of Approval, including but not limited to grading plan, building plan or mitigation monitoring review and appropriate fees paid as may be in effect at the time of submittal, as required by Resolution No. 24-1423 (Cost of Services Fee Study), or any successor thereto. Each submittal shall be accompanied with a letter clearly indicating which condition or conditions the submittal is intended to comply with.

7. Entitlement Expiration Date. The conditionally approved tentative map shall expire three (3) years after the Planning Commission’s approval date, unless extended as provided by Chapter 7 of the City of Menifee Municipal Code or the

Page 5 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 214

Menifee Mayor and City Council
December 3, 2025
Page
806 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 215

Menifee Mayor and City Council
December 3, 2025
Page
807 of 966

Subdivision Map Act. Action on a minor change and/or revised map request shall not extend the time limits of the originally approved tentative map.

8. Modifications or Revisions. The applicant shall obtain City approval for any modifications or revisions to the approval of this project.

9. State Density Bonus Law. The City of Menifee Municipal Code Section 9.180 and California Government Code Section 65915 allow for projects that are utilizing Density Bonus Law to also request unlimited waivers of development standards if those development standards have the effect of physically precluding the construction of a housing development that provides for 5% of the residential units as very low-income affordable units. The project proposes 5% or nine (9) of the residential units as very low-income affordable and therefore can request unlimited waivers of development standards. The proposed project is requesting waivers of the development standards listed below:

10. Comply with Ordinances. This project shall comply with the standards of the City of Menifee Development Code, City of Menifee Municipal Code, City of

Page 6 of 66 ends

Development Standards Specific Plan Req. Proposed
SDBLPLANNING AREA 7A
Lot Size 4,000 SF (Min.) 2,625 SF (Min.)*
Lot Dimensions 40’ X 90’ 35’ X 75’ *
Lot Frontage 40’ 35’ *
Front Yard 10’ 3’ *
Side Yard (Int.) 5’ 4’
Garage Separation 30’ 8’
Building Separation 10’ 8’
Lot Coverage 50% 65% *

PLANNING AREA 7B
Lot Size (Min.) 7,200 SF (Min.) 2,625 SF (Min.)
Lot Dimensions (Min.) 60’ X 100’ 35’ X 75’
Front Yard Setback 10’ 3’
Side Yard (Int.) 5’ 4’
Garage Separation 30’ 8’

*Majority of the lots meet the minimum requirement of the SP (69 of 75 lots)

Additional Waivers- Landscaping
7B - Front Yard Tree Requirements. According to Municipal Code section

9.195.050(A), front yard landscaping must include at least one fifteen-gallon size tree per lot, one five-gallon size tree per lot, and a variety of drought tolerant shrubs and ground cover. The applicant has requested a waiver to the requirement for two trees in every front yard within PA 7B; the Project will provide drought tolerant shrubs and ground cover.

7A and 7B - Street Tree Landscaping. The city requires at least 1 street tree at the front of each residential lot and in the street side yard. The applicant is seeking a waiver for parkway landscaping.

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 216

Menifee Mayor and City Council
December 3, 2025
Page
808 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 217

Menifee Mayor and City Council
December 3, 2025
Page
809 of 966

Menifee Design Guidelines and all other applicable ordinances and State and Federal codes and regulations.

11. Outside Lighting. Any outside lighting shall be hooded and directed so as not to shine directly upon adjoining property or public rights-of-way and so as to prevent either the spillage of lumens or reflection into the sky.

12. Map Act Compliance. This land division shall comply with the State of California Subdivision Map Act and to all requirements of Title 7 of the City of Menifee Municipal Code, unless modified by the conditions listed herein.

13. No Offsite Subdivision Signage. No offsite subdivision signs advertising this land division/development are permitted, other than those allowed under the Menifee Municipal Code. Violation of this condition of approval may result in no further permits of any type being issued for this subdivision until the unpermitted signage is removed.

14. Development Fees. The applicant shall pay all applicable development impact fees including but not limited to Development Impact, Multi-Species Habitat Conservation Plan (MSHCP), Quimby, Stephen’s Kangaroo Rat (KRAT), and School Fees.

15. Phases. Construction of this project may be done progressively in phases provided a phasing plan is submitted with appropriate fees to the Planning Division and approved prior to issuance of any Building Permits.

16. Property Maintenance. All parkways, entryway medians, on-site and off-site landscaping, walls, fencing, recreational facilities, basins, and on-site lighting shall be maintained by the property owner or private entity or the City of Menifee Community Facilities District (CFD).

All landscaping, basins, and similar improvements not properly maintained by a property owners association, property owner or the common area maintenance director must be annexed into a Lighting and Landscape District, or other mechanism as determined by the City of Menifee.

The land divider, or any successor-in-interest to the land divider, shall be responsible for maintenance and upkeep of all slopes, landscaped areas and irrigation systems within the land division until such time as those operations are the responsibility of a property owner’s association, or any other successor- in-interest.

The owners of each individual lot shall be responsible for maintaining all landscaping between the curb of the street and the proposed sidewalk and side yard landscaping between the curb of the street and proposed fencing, unless the landscaping is included within a separate common lot maintained by an HOA or other entity acceptable to the City of Menifee.

17. Trash Receptacles. Trash bins should be placed at the curb or in the street by 6:00 am on your designated trash pickup day. Bins should be placed no more

Page 7 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 218

Menifee Mayor and City Council
December 3, 2025
Page
810 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 219

Menifee Mayor and City Council
December 3, 2025
Page
811 of 966

than 24 hours prior to normal collection time and removed within 12 hours after collection. Trash bins shall be stored out of public view.

18. Landscape Plans. All landscaping plans shall be prepared in accordance with the City’s Water Efficient Landscape Ordinance. Such plans shall be reviewed and approved by the Community Development Department, and the appropriate maintenance authority.

19. Human Remains. If human remains are encountered, State Health and Safety Code Section 7050.5 states that no further disturbance shall occur until the Riverside County Coroner has made the necessary findings as to origin. Further, pursuant to Public Resource Code Section 5097.98(b) remains shall be left in place and free from disturbance until a final decision as to the treatment and disposition has been made. If the Riverside County Coroner determines the remains to be Native American, the Native American Heritage Commission shall be contacted within the period specified by law (24 hours). Subsequently, the Native American Heritage Commission shall identify the "most likely descendant." The most likely descendant shall then make recommendations and engage in consultation concerning the treatment of the remains as provided in Public Resources Code Section 5097.98.

20. Non-Disclosure of Location Reburials. It is understood by all parties that unless otherwise required by law, the site of any reburial of Native American human remains or associated grave goods shall not be disclosed and shall not be governed by public disclosure requirements of the California Public Records Act. The Coroner, parties, and Lead Agencies, will be asked to withhold public disclosure information related to such reburial, pursuant to the specific exemption set forth in California Government Code 6254 (r).

21. Inadvertent Archeological Find. If during ground disturbance activities, unique cultural resources are discovered that were not assessed by the archaeological report(s) and/or environmental assessment conducted prior to project approval, the following procedures shall be followed. Unique cultural resources are defined, for this condition only, as being multiple artifacts in close association with each other, but may include fewer artifacts if the area of the find is determined to be of significance due to its sacred or cultural importance as determined in consultation with the Native American Tribe(s). a) All ground disturbance activities within 100 feet of the discovered cultural resources shall be halted until a meeting is convened between the developer, the archaeologist, the tribal representative(s) and the Community Development Director to discuss the significance of the find. b) At the meeting, the significance of the discoveries shall be discussed and after consultation with the tribal representative(s) and the archaeologist, a decision shall be made, with the concurrence of the Community Development Director, as to the appropriate mitigation (documentation, recovery, avoidance, etc.) for the cultural resources.
c) Grading of further ground disturbance shall not resume within the area of the discovery until an agreement has been reached by all parties as to the appropriate mitigation. Work shall be allowed to continue outside of the buffer area and will be monitored by additional Tribal monitors if needed.

Page 8 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 220

Menifee Mayor and City Council
December 3, 2025
Page
812 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 221

Menifee Mayor and City Council
December 3, 2025
Page
813 of 966

d) Treatment and avoidance of the newly discovered resources shall be consistent with the Cultural Resources Management Plan and Monitoring Agreements entered into with the appropriate tribes. This may include avoidance of the cultural resources through project design, in-place preservation of cultural resources located in native soils and/or re-burial on the Project property so they are not subject to further disturbance in perpetuity as identified in Non-Disclosure of Reburial Condition. e) Pursuant to Calif. Pub. Res. Code § 21083.2(b) avoidance is the preferred method of preservation for archaeological resources and cultural resources. If the landowner and the Tribe(s) cannot agree on the significance or the mitigation for the archaeological or cultural resources, these issues will be presented to the City Community Development Director for decision. The City Community Development Director shall make the determination based on the provisions of the California Environmental Quality Act with respect to archaeological resources, recommendations of the project archeologist and shall take into account the cultural and religious principles and practices of the Tribe.

Notwithstanding any other rights available under the law, the decision of the City Community Development Director shall be appealable to the City Planning Commission and/or City Council.”

22. Cultural Resources Disposition. In the event that Native American cultural resources are discovered during the course of ground disturbing activities (inadvertent discoveries), the following procedures shall be carried out for final disposition of the discoveries:
a. One or more of the following treatments, in order of preference, shall be employed with the tribes. Evidence of such shall be provided to the City of Menifee Planning Division:
i. Preservation-In-Place of the cultural resources, if feasible. Preservation in place means avoiding the resources, leaving them in the place where they were found with no development affecting the integrity of the resources. ii. Reburial of the resources on the Project property. The measures for reburial shall include, at least, the following: Measures and provisions to protect the future reburial area from any future impacts in perpetuity. Reburial shall not occur until all legally required cataloging and basic recordation have been completed, with an exception that sacred items, burial goods and Native American human remains are excluded. Any reburial process shall be culturally appropriate. Listing of contents and location of the reburial shall be included in the confidential Phase IV report. The Phase IV Report shall be filed with the City under a confidential cover and not subject to Public Records Request.
iii. If preservation in place or reburial is not feasible then the resources shall be curated in a culturally appropriate manner at a Riverside County curation facility that meets State Resources Department Office of Historic Preservation Guidelines for the Curation of Archaeological Resources ensuring access and use pursuant to the Guidelines. The collection and associated records shall be transferred, including title, and are to be accompanied by payment of the fees necessary for permanent curation. Evidence of curation in the form of a letter

Page 9 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 222

Menifee Mayor and City Council
December 3, 2025
Page
814 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 223

Menifee Mayor and City Council
December 3, 2025
Page
815 of 966

from the curation facility stating that subject archaeological materials have been received and that all fees have been paid, shall be provided by the landowner to the City. There shall be no destructive or invasive testing on sacred items, items of Native American Cultural Patrimony, burial goods and Native American human remains. Results concerning findings of any inadvertent discoveries shall be included in the Phase IV monitoring report.

23. Inadvertent Paleontological Find. In the event that fossils or fossil-bearing deposits are discovered during construction, excavations within fifty (50) feet of the find shall be temporarily halted or diverted. The contractor shall notify a qualified paleontologist to examine the discovery. The paleontologist shall document the discovery as needed in accordance with Society of Vertebrate Paleontology standards, evaluate the potential resource, and assess the significance of the find under the criteria set forth in CEQA Guidelines Section 15064.5. The paleontologist shall notify the Planning Division to determine procedures that would be followed before construction is allowed to resume at the location of the find. If in consultation with the paleontologist, the Project proponent determines that avoidance is not feasible, the paleontologist shall prepare an excavation plan for mitigating the effect of the Project on the qualities that make the resource important. The plan shall be submitted to the Planning Division for review and approval and the Project proponent shall implement the approval plan.

PRIOR TO FINAL MAP

24. Processing Fees. Prior to final map recordation, the Planning Division shall determine if any fees for the project are in a negative balance. If so, any outstanding fees shall be paid by the applicant.

25. Final Map Required. After the approval of the TENTATIVE MAP and prior to the expiration of said map, the land divider shall cause the real property included within the TENTATIVE MAP, or any part thereof, to be surveyed and a FINAL MAP thereof prepared in accordance with the current Engineering Department - Survey Division requirements, the conditionally approved TENTATIVE MAP, and in accordance with City of Menifee Municipal Code.

26. Density Bonus Affordable Housing Agreement and Declaration of Restrictive Covenants. Prior to map recordation, the applicant shall execute (with signature(s) notarized) a Density Bonus Affordable Housing Agreement and Declaration of Restrictive Covenants prepared by the City Attorney (a “DBA”).

Following the applicant’s execution of the DBA and delivery to the City of the applicant’s original notarized signature(s) to the DBA, the City will process the DBA for City execution. Upon execution by the City Manager and City Attorney, the DBA shall be returned to the applicant, and the applicant shall, upon five (5) business days thereafter, record the DBA against the project site and deliver a copy of the recorded DBA to the City. The DBA shall, among other terms and provisions, (i) set forth the number of “base” units, affordable units, and density bonus units, (ii) set forth any concessions, incentives, and/or waivers granted by the City, (iii) set forth for the affordable units, the restricted income level, the sales process, and the formula for calculating the affordable sales price, all pursuant to the requirements of the Density Bonus Law (California Government Code section 65915 et seq.), (iv) require that the

Page 10 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 224

Menifee Mayor and City Council
December 3, 2025
Page
816 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 225

Menifee Mayor and City Council
December 3, 2025
Page
817 of 966

affordable units (a) have the same finishes and features as the base package for the market-rate units, (b) be dispersed among all of the units in the project and not clustered in one location, (c) be proportionate in size and number of bedrooms/bathrooms as the market rate units, (d) be constructed, completed and marketed for sale concurrently and on a proportionate basis with the market rate units, and (e) be sold to an income-qualified household pursuant to a lottery process which the City shall oversee and pursuant to which lottery none of the principals of the applicant, persons related to such principals, or any of the applicant’s employees, may participate, and (v) include as attachments forms of documents to be signed by the buyer of each affordable unit and recorded against their affordable unit, and a form of termination agreement that terminates the DBA with respect to each market rate unit. If a unit is not sold to an income-qualified household within 180 days after the City’s issuance of a certificate of occupancy for such unit, the unit may also be offered for sale to qualified nonprofit housing corporations that meet the requirements set forth in California Government Code section 65915(c)((2), subject to compliance with all of the requirements of said section. The applicant’s failure to comply with the requirements in this condition shall result in the approval of the project being voided. Note that all calculations resulting in fractions are rounded up to the next whole number (Government Code 65915[f][5]).

27. ECS. The land divider shall prepare an Environmental Constraints Sheet (ECS) in accordance with Menifee Municipal Code, which shall be submitted as part of the plan check review of the FINAL MAP. A note shall be placed on the FINAL MAP “Environmental Constraint Sheet affecting this map is on file at the City of Menifee Public Works and Engineering Department, in E.C.S Book ___, Page ___.”

28. ECS Note on Dark Sky Lighting. The following Environmental Constraints Note shall be placed on the ECS:
"This property is subject to lighting restrictions as required by Municipal Code Chapter 6 (Ordinance No. 2009-024), which are intended to reduce the effects of night lighting on the Mount Palomar Observatory. All proposed outdoor lighting systems shall be in conformance with Menifee Municipal Code Chapter

6.”

PRIOR TO GRADING PERMIT ISSUANCE

29. Processing Fees. Prior to issuance of grading permits, the Planning Division shall determine if any fees for the project are in a negative balance. If so, any outstanding fees shall be paid by the applicant.

30. Stephen’s Kangaroo Rat Fee. The applicant shall pay the appropriate Stephen’s Kangaroo Rat Fee prior to grading permit issuance.

31. Mitigation Monitoring. Prior to issuance of grading permits, the applicant shall prepare and submit a written report to the Community Development Director for review and approval demonstrating compliance with the standard conditions of approval and mitigation measures identified in the CEQA Guidelines § 15183 Compliance Environmental Checklist for this project which must be satisfied.

Page 11 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 226

Menifee Mayor and City Council
December 3, 2025
Page
818 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 227

Menifee Mayor and City Council
December 3, 2025
Page
819 of 966

The Community Development Director may require inspection or other monitoring to ensure such compliance.

32.Fugitive Dust Control. The permittee shall implement fugitive dust control measures in accordance with Southern California Air Quality Management District (SCAQMD) Rule 403. The permittee shall include in construction contracts the control measures required under Rule 403 at the time of development, including the following:
a. Use watering to control dust generation during demolition of structures or break-up of pavement. The construction area and vicinity (500-foot radius) must be swept (preferably with water sweepers) and watered at least twice daily. Site wetting must occur often enough to maintain a ten (10) percent surface soil moisture content throughout all earth moving activities. All unpaved demolition and construction areas shall be wetted at least twice daily during excavation and construction, and temporary dust covers shall be used to reduce dust emissions and meet SCAQMD District Rule 403. Wetting could reduce fugitive dust by as much as fifty percent (50%).
b. Water active grading/excavation sites and unpaved surfaces at least three (3) times daily;
c. All paved roads, parking and staging areas must be watered at least once every two (2) hours of active operations;
d. Site access points must be swept/washed within thirty (30) minutes of visible dirt deposition;
e. Sweep daily (with water sweepers) all paved parking areas and staging areas;
f. Onsite stockpiles of debris, dirt or rusty material must be covered or watered at least twice daily;
g. Cover stockpiles with tarps or apply non-toxic chemical soil binders; h. All haul trucks hauling soil, sand and other loose materials must either be covered or maintain two feet of freeboard;
All inactive disturbed surface areas must be watered on a daily basis when there is evidence of wind drive fugitive dust;
i. Install wind breaks at the windward sides of construction areas; j. Operations on any unpaved surfaces must be suspended when winds exceed twenty-five (25) mph;
k. Suspend excavation and grading activity when winds (instantaneous gusts) exceed fifteen (15) miles per hour over a thirty (30) minute period or more, so as to prevent excessive amounts of dust;

Page 12 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 228

Menifee Mayor and City Council
December 3, 2025
Page
820 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 229

Menifee Mayor and City Council
December 3, 2025
Page
821 of 966

. All haul trucks must have a capacity of no less than twelve and three- quarter (12.75) cubic yards;
a. All loads shall be secured by trimming, watering or other appropriate means to prevent spillage and dust;
l. Traffic speeds on unpaved roads must be limited to fifteen (15) miles per hour;
m. Provide daily clean-up of mud and dirt carried onto paved streets from the site;
n. Install wheel washers for all exiting trucks, or wash off the tires or tracks of all trucks and equipment leaving the site;
o. All materials transported off-site shall be either sufficiently watered or securely covered to prevent excessive amount of dust;
p. Operations on any unpaved surfaces must be suspended during first and second stage smog alerts; and,
q. An information sign shall be posted at the entrance to each construction site that identifies the permitted construction hours and provides a telephone number to call and receive information about the construction project or to report complaints regarding excessive fugitive dust generation. Any reasonable complaints shall be rectified within twenty-four (24) hours of their receipt.

33.Archeologist Retained. Prior to issuance of a grading permit the project applicant shall retain a Riverside County qualified archaeologist to monitor all ground disturbing activities in an effort to identify any unknown archaeological resources.
a. The Project Archaeologist and the Tribal monitor(s) shall manage and oversee monitoring for all initial ground disturbing activities and excavation of each portion of the project site including clearing, grubbing, tree removals, mass or rough grading, trenching, stockpiling of materials, rock crushing, structure demolition and etc.

The Project Archaeologist and the Tribal monitor(s), shall have the authority to temporarily divert, redirect or halt the ground disturbance activities to allow identification, evaluation, and potential recovery of cultural resources in coordination with any required special interest or tribal monitors.
b. The developer/permit holder shall submit a fully executed copy of the contract to the Planning Division to ensure compliance with this condition of approval. Upon verification, the Planning Division shall clear this condition.

Page 13 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 230

Menifee Mayor and City Council
December 3, 2025
Page
822 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 231

Menifee Mayor and City Council
December 3, 2025
Page
823 of 966

r. In addition, the Project Archaeologist, in consultation with the Consulting Tribe(s), the contractor, and the City, shall develop a Cultural Resources Management Plan (CRMP) in consultation pursuant to the definition in AB52 to address the details, timing and responsibility of all archaeological and cultural activities that will occur on the project site. A consulting tribe is defined as a tribe that initiated the AB 52 tribal consultation process for the Project, has not opted out of the AB52 consultation process, and has completed AB 52 consultation with the City as provided for in Cal Pub Res Code Section 21080.3.2(b)(1) of AB52. Details in the Plan shall include:
s. Project grading and development scheduling;
i. The Project archeologist and the Consulting Tribes(s) shall attend the pre-grading meeting with the City, the construction manager and any contractors and will conduct a mandatory Cultural Resources Worker Sensitivity Training to those in attendance. The Training will include a brief review of the cultural sensitivity of the Project and the surrounding area; what resources could potentially be identified during earthmoving activities; the requirements of the monitoring program; the protocols that apply in the event inadvertent discoveries of cultural resources are identified, including who to contact and appropriate avoidance measures until the find(s) can be properly evaluated; and any other appropriate protocols. All new construction personnel that will conduct earthwork or grading activities that begin work on the Project following the initial Training must take the Cultural Sensitivity Training prior to beginning work and the Project archaeologist and Consulting Tribe(s) shall make themselves available to provide the training on an as-needed basis.
ii. The protocols and stipulations that the contractor, City, Consulting Tribe(s) and Project archaeologist will follow in the event of inadvertent cultural resources discoveries, including any newly discovered cultural resource deposits that shall be subject to a cultural resource’s evaluation.

34. Native American Monitoring (Pechanga). Tribal monitor(s) shall be required on- site during all ground-disturbing activities, including grading, stockpiling of materials, engineered fill, rock crushing, etc. The land divider/permit holder shall retain a qualified tribal monitor(s) from the Pechanga Band of Indians. Prior to issuance of a grading permit, the developer shall submit a copy of a signed contract between the above-mentioned Tribe and the land divider/permit holder for the monitoring of the project to the Planning Division and to the Engineering Department. The Tribal Monitor(s) shall have the authority to temporarily divert, redirect or halt the ground-disturbance activities to allow recovery of cultural resources, in coordination with the Project Archaeologist.

35. Native American Monitoring (Soboba). Tribal monitor(s) shall be required on- site during all ground-disturbing activities, including grading, stockpiling of

Page 14 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 232

Menifee Mayor and City Council
December 3, 2025
Page
824 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 233

Menifee Mayor and City Council
December 3, 2025
Page
825 of 966

materials, engineered fill, rock crushing, etc. The land divider/permit holder shall retain a qualified tribal monitor(s) from the Soboba Band of Luiseno Indians. Prior to issuance of a grading permit, the developer shall submit a copy of a signed contract between the above-mentioned Tribe and the land divider/permit holder for the monitoring of the project to the Planning Division and to the Engineering Department. The Tribal Monitor(s) shall have the authority to temporarily divert, redirect or halt the ground-disturbance activities to allow recovery of cultural resources, in coordination with the Project Archaeologist.

36. Paleontologist Required. This site is mapped as having a high potential for paleontological resources (fossils) at shallow depth. Therefore, PRIOR TO ISSUANCE OF GRADING PERMITS:
a. The applicant shall retain a qualified paleontologist approved by the City of Menifee to create and implement a project-specific plan for monitoring site grading/earthmoving activities which exceeds 5 feet in depth in native sedimentary.
b. The project paleontologist retained shall review the approved Tentative Tract Map and shall conduct any pre-construction work necessary to render appropriate monitoring and mitigation requirements as appropriate. These requirements shall be documented by the project paleontologist in a Paleontological Resource Impact Mitigation Program (PRIMP). This PRIMP shall be submitted to the Planning Division for review and approval prior to issuance of a Grading Permit. c. Information to be contained in the PRIMP, at a minimum and in addition to other industry standard and Society of Vertebrate Paleontology standards, are as follows:
i. The project paleontologist shall participate in a pre-construction project meeting with development staff and construction operations to ensure an understanding of any mitigation measures required during construction, as applicable.
ii. Paleontological monitoring of earthmoving activities will be conducted on an as-needed basis by the project paleontologist during all earthmoving activities that may expose sensitive strata.

Earthmoving activities in areas of the project area where previously undisturbed strata will be buried but not otherwise disturbed will not be monitored. The project paleontologist or his/her assign will have the authority to reduce monitoring once he/she determines the probability of encountering fossils has dropped below an acceptable level.
iii. If the project paleontologist finds fossil remains, earthmoving activities will be diverted temporarily around the fossil site until the remains have been evaluated and recovered. Earthmoving will be allowed to proceed through the site when the project paleontologist determines the fossils have been recovered and/or the site mitigated to the extent necessary.

Page 15 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 234

Menifee Mayor and City Council
December 3, 2025
Page
826 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 235

Menifee Mayor and City Council
December 3, 2025
Page
827 of 966

iv. If fossil remains are encountered by earthmoving activities when the project paleontologist is not onsite, these activities will be diverted around the fossil site and the project paleontologist called to the site immediately to recover the remains.
v. If fossil remains are encountered, fossiliferous rock will be recovered from the fossil site and processed to allow for the recovery of smaller fossil remains. Test samples may be recovered from other sampling sites in the rock unit if appropriate.
vi. Any recovered fossil remains will be prepared to the point of identification and identified to the lowest taxonomic level possible by knowledgeable paleontologists. The remains then will be curated (assigned and labeled with museum* repository fossil specimen numbers and corresponding fossil site numbers, as appropriate; places in specimen trays and, if necessary, vials with completed specimen data cards) and catalogued, an associated specimen data and corresponding geologic and geographic site data will be archived (specimen and site numbers and
corresponding data entered into appropriate museum repository catalogs and computerized data bases) at the museum repository by a laboratory technician. The remains will then be accessioned into the museum* repository fossil collection, where they will be permanently stored, maintained, and, along with associated specimen and site data, made available for future study by qualified scientific investigators.
vii. The City of Menifee must be consulted on the repository/museum to receive the fossil material prior to being curated.
viii. A qualified paleontologist shall prepare a report of findings made during all site grading activity with an appended itemized list of fossil specimens recovered during grading (if any). This report shall be submitted to the Planning Division for review and approval prior to building final inspection as described elsewhere in these conditions.
ix. All reports shall be signed by the project paleontologist and all other professionals responsible for the report's content (e.g.

Professional Geologist, Professional Engineer, etc.), as appropriate. Two wet-signed original copies of the report shall be submitted directly to the Planning Division along with a copy of this condition, deposit-based fee and the grading plan for appropriate case processing and tracking.

37.Pre-Grading Meeting. The qualified archaeologist shall attend the pre-grading meeting with the contractors to explain and coordinate the requirements of the monitoring program, including a cultural sensitivity training component.

Page 16 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 236

Menifee Mayor and City Council
December 3, 2025
Page
828 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 237

Menifee Mayor and City Council
December 3, 2025
Page
829 of 966

38.Burrowing Owl Pre-Construction Survey. The Project Developer shall retain a qualified biologist to conduct a pre-construction survey for Burrowing Owl within 30 days prior to the start of construction. The results of the single one-day survey would be submitted to the City prior to obtaining a grading permit. If Burrowing Owl are not detected during the pre-construction survey, no further mitigation is required. If Burrowing Owl are detected during the pre-construction survey, the Project applicant and a qualified consulting biologist will be required to prepare and submit for approval a Burrowing Owl relocation program.

39. Nesting Bird Pre-Construction Survey. Prior to vegetation clearance, the Project applicant shall retain a qualified biologist to conduct a pre-construction nesting bird survey in accordance with the following:
a. The final walkover survey shall be conducted no more than three (3) days prior to the initiation of clearance/construction work; b. If pre-construction surveys indicate that bird nests are not present or are inactive, or if potential habitat is unoccupied, no further mitigation is required;
c. If active nesting birds are found during the surveys, a species-specific no-disturbance buffer zone shall be established by a qualified biologist around active nests until a qualified biologist determines that all young have fledged (i.e., no longer reliant upon the nest).
d. It is recommended that close coordination between the developer of the site, the City of Menifee, the project engineer, and the consulting qualified biologist to consider vegetation clearance outside of the normal bird nesting season (usually February 1 – August 31) to avoid impacts to nesting birds which would potentially violate the federal Migratory Bird Treaty Act. It should be noted that bird nesting season is increasingly less-definitive for some year-round resident species such as hummingbirds and raptors. Further, ground-dwelling birds such as burrowing owls, can be affected nearly any time of the year if present. It is therefore advisable to conduct a preconstruction bird survey no matter the time of year.
e. Removal of vegetation necessitates installation of appropriate Storm Water Pollution Prevention Plan “SWPPP” measures, particularly if development subsequent to grading is not undertaken immediately, therefore careful timing of the project schedule and implementation measures is necessary to avoid water quality impacts.

PRIOR TO BUILDING PERMIT ISSUANCE

40.Processing Fees. Prior to issuance of building permits, the Planning Division shall determine if any fees for the project are in a negative balance. If so, any outstanding fees shall be paid by the applicant.

41.Development Fees. The applicant shall pay the following:
Multi-Species Habitat Conservation Plan Fees (MSHCP) shall be paid prior to issuance of each residential unit within the project. MSHCP fees

Page 17 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 238

Menifee Mayor and City Council
December 3, 2025
Page
830 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 239

Menifee Mayor and City Council
December 3, 2025
Page
831 of 966

shall be paid for roadway improvement areas prior to improvement plan permit issuance. SB330 fee vesting NOT applicable to MSHCP Fees per RCA.
School fees shall be paid to the Perris Union High School District and the Romoland School District. Provide proof of payment (receipts) to the Planning Department prior to building permit issuance of each residential unit.
Quimby fee amounts (parks and recreation fee) shall be determined in coordination with the Community Services Department prior to issuance of the first residential unit within the project. Payment of Quimby fees must be completed prior to issuance of building occupancy of each unit.

42. Dark Sky Ordinance. All streetlights and other outdoor lighting shall be shown on electrical plans submitted to the Building and Safety Division and the Planning Division for plan check approval and shall comply with the requirements of Menifee Municipal Code Chapter 6.01, the “Dark Sky Ordinance”, and the General Plan.

43. Roof Mounted Equipment. Roof-mounted mechanical equipment shall not be permitted within the subdivision, however, solar equipment or any other energy- saving devices shall be permitted with Planning Division approval.

44. Utilities Underground. All utilities, except electrical lines rated 33 kV or greater, shall be installed underground. If the applicant provides to the Building and Safety Division and the Planning Division a definitive statement from the utility provider refusing to allow underground installation of the utilities they provide, this condition shall be null and void with respect to that utility.

45. Minor Plot Plans. Prior to building permit issuance, the applicant shall submit the following minor plot plan applications to the Planning Division (pursuant to Menifee Municipal Code) for review and approval. The fee for each submittal will be determined by Resolution No. 24-1423 Cost of Services Fee Study and Planning Division Fee Schedule at the time of application submittal. Minor Plot Plan Submittals include:
a. Model Home Complex (MHC) – Plotting, landscaping and irrigation for the model home complex. Performance Securities will be required prior to approval of this minor plot plan.
b. On-Site Landscaping – all HOA or private entity maintained landscaping and irrigation. Performance Securities will be required prior to approval of this minor plot plan.
c. Front Yard Typicals (FYT’s) – all homeowner-maintained landscaping in front yards (if applicable).

Additional submittal requirements can be found in the minor plot plan submittal checklist found on the Community Development Department’s website. All minor plot plans must be approved prior to the issuance of any production lot within the tract.

Page 18 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 240

Menifee Mayor and City Council
December 3, 2025
Page
832 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 241

Menifee Mayor and City Council
December 3, 2025
Page
833 of 966

46. Performance Securities. Performance securities, in amounts to be determined by the Director of Community Development to guarantee the installation of plantings, irrigation system, walls and/or fences, in accordance with the approved plan, shall be filed with the Department of Community Development. Securities may require review by City Attorney and other staff. Permit holder is encouraged to allow adequate time to ensure that securities are in place. The performance security may be released one year after structural final, inspection report, and the One-Year Post Establishment report confirms that the planting and irrigation components have been adequately installed and maintained. A cash security shall be required when the estimated cost is $2,500.00 or less. At applicant’s election, a cash security may also be used for amounts exceeding $2,500.

47. Landscape Inspections. Prior to issuance of Building Permits, the permit holder shall open a Landscape Deposit Based Fee case and deposit the prevailing deposit amount to cover the pre-inspection, initial installation inspection, Six (6) Month and One Year Landscape Inspections.

48. Suspension of Building Permit Issuance and/or Inspections. Failure to comply with any deadline for the development of the improvements and/or amenities shall halt the issuance of building permits and suspension of all building inspections for residential dwelling units within the subdivision.

49. Common Area Improvement Plans. Prior to issuance of the first residential unit building permit, the construction plans for all landscaping and irrigation within the open space areas shall be approved by the Community Development Department and/or Engineering Department.

50. Common Area Improvement Construction. All landscaping and irrigation in common areas not specifically mentioned elsewhere within these Conditions of Approval, shall be installed, and pass final landscape inspection prior to issuance of occupancy for adjacent residential unit(s) or as determined by the Director of Community Development.

51. Central Amenity Required (Recreation Center). Prior to issuance of the first residential building permit, the applicant shall submit a final central amenity plan to the City of Menifee Community Development Department for review and approval and shall be consistent as shown on the approved tentative map and plot plan. Furthermore, the plan shall be consistent with the plan requirements detailed in Menifee Municipal Code Chapter 9.195 and with Menifee Municipal Code Chapter 15.04 for water efficient landscaping.

52. Central Amenity Required (Recreation Center). The central amenity shall be installed and open to the public prior to 75% building permit issuance of the total units, or 50% of final occupancies, whichever occurs first. The amenities shall be installed per City approved plot plan. The amenities will be inspected by City staff to verify that this has occurred. Failure to comply with any deadline for the development of the improvements and/or amenities shall halt the issuance of building permits and suspension of all building inspections for residential dwelling units within the subdivision. The Community Development Director shall have the ability to defer the installation of the park landscaping and

Page 19 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 242

Menifee Mayor and City Council
December 3, 2025
Page
834 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 243

Menifee Mayor and City Council
December 3, 2025
Page
835 of 966

amenities as noted below but may require performance securities and additional deposits to cover administrative costs.

53. Tot Lot Area Required. Prior to issuance of the first residential building permit, the applicant shall submit a final landscape plan to the City of Menifee Community Development Department for review and approval and shall be consistent as shown on the approved tentative map and plot plan. Furthermore, the plan shall be consistent with the plan requirements detailed in Menifee Municipal Code Chapter 9.195 and with Menifee Municipal Code Chapter 15.04 for water efficient landscaping.
53a Tot Lot Fencing. The tot lot shall be enclosed with a minimum 3-foot tall, tubular steel fence. The fencing shall be identified on future landscape plan submittals. Added by the Planning Commission on October 22, 2025.

54. Tot Lot Required. The Tot Lot and surrounding amenity shall be installed and open to the public prior to building permit issuance of 75% of the total units. The amenities shall be installed per City approved plot plan. The amenities will be inspected by City staff to verify that this has occurred. Failure to comply with any deadline for the development of the improvements and/or amenities shall halt the issuance of building permits and suspension of all building inspections for residential dwelling units within the subdivision. The Community Development Director shall have the ability to defer the installation of the park landscaping and amenities as noted below but may require performance securities and additional deposits to cover administrative costs

55. Planning Area 10 Park Plans. Prior to the issuance of the 400th Building Permit within the Specific Plan (for portions within the boundaries of the City of Menifee), a minor plot plan application shall be submitted to and approved by the Community Services Department and/or Community Development Department showing the conceptual park plans for Planning Area 10 within the Specific Plan.

Conceptual plans shall contain overall site map or tract map showing locations of all parks, trails, channels, basins and/or open spaces; vicinity map; street names; north arrow; adjacent land use; proposed park layout including but not limited to parking lot and concrete layout, all proposed amenities, (including, but not limited to gazeboes, tot lots, picnic areas, lighting, decomposed granite trails, etc. as shown in the Specific Plan); turf and planter layout; tree locations; and plant palette. The plans shall be approved by The City or other entity acceptable to the City of Menifee. SATISFIED. IOD PROVIDED TO THE CITY AS REFERENCED IN THE EXECUTED PARK DEVELOPMENT AGREEMENT.

56. Planning Area 10 Working/Construction Park Plans. Prior to the issuance of the 550th Building Permit within the Specific Plan (for proportions within the boundaries of the City of Menifee), working/construction park plans shall be submitted to and approved by the Community Services Department and/or Engineering and Public Works Department for the park within Planning Area 10 of the Specific Plan. The plans shall be approved by The City or other entity acceptable to the City of Menifee. SATISFIED. IOD PROVIDED TO THE CITY

AS REFERENCED IN THE EXECUTED PARK DEVELOPMENT
AGREEMENT.

Page 20 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 244

Menifee Mayor and City Council
December 3, 2025
Page
836 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 245

Menifee Mayor and City Council
December 3, 2025
Page
837 of 966

57. Planning Area 10 Park Construction. Prior to issuance of the 650th building permit within the Specific Plan (for portions within the boundaries of the City of Menifee), the park designated as Planning Area 10 shall be constructed and open to the public. SATISFIED. IOD PROVIDED TO THE CITY AS REFERENCED IN THE EXECUTED PARK DEVELOPMENT AGREEMENT.

58. Quimby Fees. The proposed subdivision will fulfill Quimby obligations through a combination of parkland dedication and payment of in-lieu fees, as indicated in the recorded Park Agreement and as determined by the Community Services Director.

The developer shall pay in-lieu fees for all units exceeding 167 units (proposed project includes 192 units or an increase of 25 units).

Prior to the issuance of a building permit, the City Manager or his/her designee shall determine the amount of Quimby Fees to be paid by the subdivider. Quimby fees shall be paid directly to the City prior to the issuance of the first certificate of occupancy of any dwelling unit in the subdivision.

59. Open Space Landscape. All landscaping and irrigation in open space areas not specifically mentioned elsewhere within these Conditions of Approval, shall be installed and inspected prior to issuance of occupancy for adjacent residential units.

The Community Development Director shall have the ability to modify or defer the installation of the landscaping as noted above, but may require performance securities and additional deposits to cover administrative costs. Under no circumstance shall landscaping be deferred if 80% of the units has been issued permits.

The installation of landscaping within open space area that will be maintained by the Community Facilities District (CFD) can be modified or deferred by the Engineering and Public Works Department.

PRIOR TO FINAL INSPECTION

60. Processing Fees. Prior to issuance of building permits, the Planning Division shall determine if any fees for the project are in a negative balance. If so, any outstanding fees shall be paid by the applicant.

61. Development Impact Fees (DIF). The applicant shall pay the following:
Development Impact Fees prior to issuance of building occupancy of each residential unit.
Quimby Fees prior to the issuance of building occupancy of each residential unit exceeding 167 units or 25 units.

62.Park Performance Security. Prior to the issuance of the first certificate of occupancy within the subdivision, the developer shall provide a sufficient surety, as determined by the Community Services Director, to guarantee that the park improvements and amenities are completed and ready for public use.

Page 21 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 246

Menifee Mayor and City Council
December 3, 2025
Page
838 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 247

Menifee Mayor and City Council
December 3, 2025
Page
839 of 966

63. Entry Monuments. Prior to the first occupancy within the tract, entry monuments shall be installed in accordance with the approved entry monument plans.

64. Elevations. Elevations of all buildings and structures shall be in substantial conformance with the elevations approved as part of the final site of development plan.

65. Archeology Report - Phase III and IV. Prior to final inspection, the developer/permit holder shall prompt the Project Archeologist to submit two (2) copies of the Phase III Data Recovery report (if required for the Project) and the Phase IV Cultural Resources Monitoring Report that complies with the Community Development Department's requirements for such reports. The Phase IV report shall include evidence of the required cultural/historical sensitivity training for the construction staff held during the pre-grade meeting. The Community Development Department shall review the reports to determine adequate mitigation compliance. Provided the reports are adequate, the Community Development Department shall clear this condition. Once the report(s) are determined to be adequate, two (2) copies shall be submitted to the Eastern Information Center (EIC) at the University of California Riverside (UCR) and one (1) copy shall be submitted to the Pechanga Cultural Resources Department.

66. Paleontological Monitoring Report. Prior to issuance of a certificate of occupancy, the applicant shall submit to the Planning Division, an electronic copy of the Paleontology Monitoring Report. The report shall be certified by a professional paleontologist listed on Riverside County’s Paleontology Consultant List. A deposit for the review of the report will be required.

67. Anti-Graffiti Coating. An anti-graffiti coating shall be provided on all block walls constructed as part of any phase of the Project, and written verification from the developer shall be provided to the Planning Division.

68. Final Planning Inspection. The applicant shall obtain final occupancy sign-off from the Planning Division for each building permit issued by scheduling a final Planning inspection prior to the final sign-off from the Building Department.

Planning staff shall verify that all pertinent conditions of approval have been met, including compliance with the approved elevations, site plan, parking lot layout, decorative paving, public plazas, etc. The applicant shall have all required paving, parking, walls, site lighting, landscaping and automatic irrigation installed and in good condition.

69. Soil Management Plan. The applicant shall submit a Soil Management Plan (Report) to the Planning Division before the Landscape Installation Inspection.

The report can be sent in electronically. Information on the contents of the report can be found in the County of Riverside Guide to California Friendly Landscaping page 16, #7, “What is required in a Soil Management Plan?”

70. Landscape Inspections. The applicant shall obtain a final certificate of completion from the Planning Division’s Landscape Inspector for each building

Page 22 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 248

Menifee Mayor and City Council
December 3, 2025
Page
840 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 249

Menifee Mayor and City Council
December 3, 2025
Page
841 of 966

permit issued by scheduling a final landscape inspection prior to the final occupancy from the Planning Division.

Page 23 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 250

Menifee Mayor and City Council
December 3, 2025
Page
842 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 251

Menifee Mayor and City Council
December 3, 2025
Page
843 of 966

Section II:

Engineering Department
Conditions of Approval

Page 24 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 252

Menifee Mayor and City Council
December 3, 2025
Page
844 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 253

Menifee Mayor and City Council
December 3, 2025
Page
845 of 966

The following are the Public Works / Engineering Department Conditions of Approval for this project which shall be satisfied at no cost to the City or any other Government Agency. All questions regarding the intent of the following conditions shall be referred to the Public Works Engineering Department, Land Development Section. The developer / property owner shall use the standards and design criteria stated in the following conditions and shall comply with all applicable City of Menifee standards and ordinances. Should a conflict arise between City of Menifee standards and design criteria, and any other standards and design criteria, those of the City of Menifee shall prevail.

Tentative Tract Map 39115 is a 192 residential lot subdivision with 2 open space park areas. The map is not phased; therefore, all public improvements will be required in one construction phase prior to any issuance of occupancies. If the developer chooses to phase the subdivision map, the phasing of the public improvements will be considered, and the applicable conditions will be updated.

It is understood that the tentative tract map must correctly show acceptable centerline elevations, all existing easements, traveled ways, cross sections, and drainage courses with appropriate drainage flows. Any omission or unacceptability may require the map to be resubmitted for further consideration. If there is a conflict between what is shown on the tentative tract map and these conditions, these conditions will supersede what is shown on the tentative tract map and any attachments to the tentative tract map, including the site plan and other plans or exhibits. All questions regarding the true meaning of these conditions shall be referred to the Public Works / Engineering Department. Engineering Design exceptions to City design standards and policies must be specifically requested in writing and approved by City Engineer/PW Director. Any design exceptions shown on the tentative map and associated engineering documents that are not specifically requested shall be redesigned to meet city standards.

1. Drainage Study – The following report was reviewed and approved by the City:
a. Preliminary Hydrology and Hydraulics Report for Menifee 27, 329-110-024 PLN24-0230, prepared by JLC Engineering & Consulting, Inc., dated November 11, 2024. Last Revised June 13, 2025.

The project shall comply with all recommendations in the approved drainage study, and in accordance with City Standards. The design of drainage facilities will need to be revised if it does not adhere to City Standards.

Two copies of a final drainage study (also referred to as Hydrology/Hydraulics Report) shall be submitted to the City for review and approval. The study shall analyze at a minimum the following: project site drainage flow; all future improvements drainage flow; Q10, Q100, pre- and post- condition flow rates; anticipated total drainage flow into existing storm drain; and existing storm drain capacity. A fee for review of the Drainage Study shall be paid to the City, the amount of which shall be determined by City at first submittal of report.

2. Final Project Specific Water Quality Management Plan (Final WQMP). The following report was reviewed and approved by the City:
b. Preliminary Project Specific Water Quality Management Plan, Menifee 27, PLN24-0230, prepared by JLC Engineering & Consulting, Inc., dated November 8, 2024. Revised June 13, 2025.

Page 25 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 254

Menifee Mayor and City Council
December 3, 2025
Page
846 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 255

Menifee Mayor and City Council
December 3, 2025
Page
847 of 966

Prior to issuance of a grading permit, a FINAL project specific WQMP in substantial conformance with the approved PRELIMINARY WQMP, shall be reviewed and approved by the Public Works Engineering Department. Final construction plans shall incorporate all the structural BMPs identified in the approved FINAL WQMP. The final developed project shall implement all structural and non-structural BMPs specified in the approved FINAL WQMP. One copy of the approved FINAL WQMP on a CD-ROM in pdf format shall be submitted to the Public Works Engineering Department. The FINAL WQMP submittal shall include at the minimum the following reports/studies:
a. Hydrology/hydraulics report
b. Soils Report that includes soil infiltration capacity c. Limited Phase II Environmental Site Assessment Report, as may be required by an approved Phase I ESA Report
Final construction plans shall incorporate all the structural BMPs identified in the approved FINAL WQMP. The final developed project shall implement all structural and non-structural BMPs specified in the approved FINAL WQMP. One copy of the approved FINAL WQMP on a CD-ROM in pdf format shall be submitted to the Public Works Engineering Department.

3. Geotechnical Report – The following documentation was reviewed and approved by the City:
c. Geotechnical And Infiltration Evaluation, Proposed Single-Family Residential Development, Assessor’s Parcel Numbers 329-110-024, -028, -041, -042 And -043, Menifee 27 Project California State Highway 74 And Palomar Road Menifee, Riverside County, California, prepared by GeoTek, Inc., dated September 4, 2024.

Two copies of City-approved geotechnical/soils report, no more than three (3) years from date of application for grading permit, shall be provided to the City Public Works / Engineering Department with initial submittal of a grading plan. If there is no approved report and/or said report is past three (3) years from date of application, a new geotechnical/soils report and/or update letter, respectively, shall be prepared and submitted to City for review and approval. The geotechnical/soils, compaction and inspection reports will be reviewed in conformance with the latest edition of the Riverside County Technical Guidelines for Review of Geotechnical and Geologic Reports. A fee for review of the geotechnical/soils report and/or update letter shall be paid to the City, the amount of which shall be determined by the City at the first submittal of the report.

Geotechnical Report - A geotechnical/soils report was submitted to the City and reviewed by staff. The geotechnical/soil report was reviewed in conformance with the latest edition of the Riverside County Technical Guidelines for Review of Geotechnical and Geologic Reports. Prior to issuance of any grading permit, two copies of the City approved geotechnical/soils report shall be submitted to the Public Works Engineering Department.

The developer/property owner shall comply with the recommendations of the report, and City standards and specifications. All grading shall be done in conformance with the recommendations of the report, and under the general direction of a licensed geotechnical engineer. An updated report may be required if deemed necessary by the Public Works Director prior to the issuance of any grading permit.

Page 26 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 256

Menifee Mayor and City Council
December 3, 2025
Page
848 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 257

Menifee Mayor and City Council
December 3, 2025
Page
849 of 966

4. Off-Site Dedications - Prior to the approval of any improvement plans and the commencement of any construction associated with the development, the Developer shall be responsible for obtaining all necessary dedications of rights-of-way for offsite infrastructure improvements, right-of-entry for offsite grading, and easements for ingress, egress, drainage, utilities and other legal requirements for impacts associated with the development of this project, as determined and directed by the City Engineer. If the Developer cannot acquire a property interest in property required for off-site improvements, Government Code § 66462.5 shall apply and the City retains the right to:
a. Require the Developer shall enter into an agreement to complete the improvements pursuant to Government Code § 66462 at such time as the City acquires an interest in the land that will permit the improvement to be made. b. The Developer shall pay the costs associated with acquiring the offsite real property interests required in connection with the development.

5. Palomar Road Dedication. The developer / property owner shall dedicate the necessary Palomar Road (Collector Roadway per City Circulation Element) right of way fronting the development on the final map or through another acceptable recordable instrument prior to issuance of any building permit.

6. Traffic Study Report – The following report was reviewed and approved by the City:

Menifee 27 Residential Project, Traffic Impact Analysis, TTM 39115, prepared by EPD Solutions, Inc., dated August 26, 2025.

The Public Works Department – Traffic Engineering Division has reviewed the Traffic Study and has generally concurred with its findings. The developer/property owner shall be responsible for all improvements and mitigations, required or identified in the approved traffic study and according to these Conditions of Approval, such as but not limited to right-of-way frontage improvements, traffic signal construction or modification, and fair share fees. All required improvements and mitigation measures identified in the study shall be included in all improvement plans for review and approval by the Public Works Department. Improvements identified in the Traffic Study are the absolute minimums recommended by the consultant traffic engineer. The City Engineer/PW Director may require traffic or street improvements beyond those identified in said study to address public safety and welfare, or to construct improvements eligible for DIF credits or reimbursement that front the project, as determined by the Public Works Director / City Engineer.

7. Reconstruction or Resurfacing of Palomar Road – The Public Works Director / City Engineer may consider reconstruction or resurfacing of Palomar Road paving fronting the development to meet existing conditions, provided the road is found to meet the minimum City standards for pavement conditions at the time of project construction. If it is determined during project construction that the existing road is found to be substandard, then the Public Works Director / City Engineer will require the developer / property owner to provide full reconstruction as provided for in these conditions of approval. The existing pavement shall be cored during project construction to confirm the structural section, and any findings shall be incorporated into project design. The Public Works Director / City Engineer shall have the final approval for all road conditions.

Page 27 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 258

Menifee Mayor and City Council
December 3, 2025
Page
850 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 259

Menifee Mayor and City Council
December 3, 2025
Page
851 of 966

8. Signing and Striping – A signing and striping plan for Palomar Road is required for this project along the project frontage and off-site transitions to existing striping. The applicant shall be responsible for any additional paving and/or striping removal caused by the striping plan. The Signing and Striping Plan shall be approved by the City Engineer in accordance with City ordinances, standards, and specifications, and with the latest edition of the CAMUTCD. A painted median shall be required to support or restrict turning movements in and out of the private community, unless otherwise approved by City Engineer.

9. Construction of Street and Wet Utility Improvements – The developer / property owner shall design and construct the following improvements:
a. In-Tract Private Street Improvements - Construct all streets, storm, sewer, streetlights, water, park, and wall improvements to public agency engineering standards.

Although the streets will be private, all infrastructure improvements shall adhere to public agency standards, unless otherwise approved by City Engineer / PW Director.
i. Entry Roads – The project proposes two access points as shown on the Tentative Tract Map 39115. The primary entrance shall consist of a 70-foot-wide entryway, including 40 feet of pavement (curb to curb), with 15 feet on each side allocated for sidewalk and parkway improvements. The secondary access point shall consist of a 52-foot-wide entryway, also including 40 feet of pavement (curb to curb), with 6 feet on each side for sidewalk and parkway. Both entrances will consist of a cross gutter along the frontage to support drainage and to separate the Public Right of way from the Private Roadway leading into the development.

Parking shall be prohibited within both entrance areas, which shall be maintained by the Property Owner and/or Homeowners Association (HOA). ii. Internal Private Drive – The project proposes a Private road that connects the tract via a full loop circulation and varying sizes for pavement and street sections.
iii.“A Street,” “B Street,” and “C Street” shall consist of a 52-foot-wide east-west roadway, including 40 feet of pavement (curb to curb), 8 feet of parking on each side, and 6 feet on each side for sidewalk improvements. iv.“D Street” shall consist of a 58-foot-wide east-west roadway section, including a 28-foot private driveway, 18-foot-wide parking bays adjacent to the parkways, and 6-foot sidewalks on both sides. A rolled, 0“curb shall be provided along the southern sidewalk.
v.“E Street” shall be designed as a 52-foot-wide north-south roadway section, including 40 feet of pavement (curb to curb) to accommodate one travel lane in each direction and on-street parking on both sides, with 6-foot sidewalks on each side, North of “C” Street.
vi.“E Street” shall be designed as a 40-foot-wide north-south roadway section, including 28 feet of pavement (curb to curb) to accommodate one travel lane in each direction and On-Street parking shall be prohibited on both sides, with 6-foot sidewalks on each side, South of “C” Street.

Page 28 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 260

Menifee Mayor and City Council
December 3, 2025
Page
852 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 261

Menifee Mayor and City Council
December 3, 2025
Page
853 of 966

vii.“G Street” shall be a 39-foot-wide north-south roadway section, including a 5- foot parkway on the west side and a 6-foot sidewalk on the east side. On-street parking shall be prohibited along this roadway.
viii.“H Street,” “I Street,” “J Street,” and “K Street” shall consist of a 40-foot-wide north- south roadway sections, including a 28-foot private driveway, rolled, 0” curbs on both sides, a 4.5-foot sidewalk on the West side, and a 6-foot sidewalk on the east side. On-street parking shall be prohibited along these roadways. These roadways shall be maintained by the Property Owner ! HOA. b. Traffic Calming Measures - Along “A” Street, “B” Street and “C” Street, the pedestrian pathways between the designated crosswalks and proposed curb ramps shall incorporate appropriate traffic calming measures—such as extended parkway areas, high-visibility pavement markings, or equivalent design features—to enhance pedestrian safety and support safer access to the Open Space Lots leading to the recreation center. All roadway design elements and improvements shall be subject to final review and approval by the Public Works Director and!or City Engineer.
c.Palomar Road Frontage Improvements – The developer / property owner shall construct Palomar Road to its ultimate half-width plus 12 feet per City Standards along its entire project frontage as determined by the City Engineer. Palomar road is classified as a Collector Roadway per the City’s Circulation Element. The project is proposing to construct Palomar Road using the Industrial Collector Roadway standard. An Industrial Collector proposes 78-foot-wide roadway section, including 56-feet of AC Paving, 6-foot sidewalks within an 11-foot parkway.

The required improvements shall include the construction of appropriate pavement transitions from the new improvements to existing improvements beyond the project frontage. The design of the transitions shall be in accordance with the CA Highway Design Manual, finalized during review of final construction drawings, and approved by the Public Works Director ! City Engineer.

10. Cost participation through Payment of TUMF and DIF for Offsite Improvements - The developer/property owner’s TUMF and DIF payment obligations shall be considered as cost participation for Project’s required offsite improvements only when the offsite improvements for which credits are claimed, are eligible TUMF and!or DIF facilities at time of TUMF and DIF payments.

11. Fair Share Cost Participation for Off-site Improvements – The developer ! property owner shall pay fair share costs for off-site improvements as detailed in the Traffic Study and identified below prior to issuance of a certificate of occupancy. The fair share cost estimates shall be based on conceptual exhibits prepared for the developer, signed and stamped by a licensed civil engineer, reviewed and approved by the Public Works Director ! City Engineer prior to building permit issuance. The Project’s fair share percentage for each recommended improvement and the recommended improvements are identified below with their respective intersections.
a. I-215 SB Ramps!Bonnie Drive:

Page 29 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 262

Menifee Mayor and City Council
December 3, 2025
Page
854 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 263

Menifee Mayor and City Council
December 3, 2025
Page
855 of 966

This intersection is included in the Western Riverside Council of Governments (WRCOG) Transportation Uniform Mitigation Fee (TUMF) improvement program; therefore, the Project may be eligible for TUMF credit reimbursement. The Project’s contribution toward the improvement would consist of a fair share payment of 3.17%. Add right-turn overlap phasing to EBR. Optimize the signal timing. b. I-215 NB Ramps/SR-74:

The Project’s contribution toward the improvement at this intersection will be provided through a fair share payment of 2.77%.
Widen EB approach on SR-74 from EBT/EBT/EBL to EBT/EBT/EBT/EBL. It should be noted that the receiving lane on the east leg of the intersection on SR-74 should also be restriped to accommodate the additional lane. Optimize signal timing.
c. Trumble Road/SR-74:

The Project’s contribution toward the improvement at this intersection will be provided through a fair share payment of 2.96%.
Restripe SB on Trumble Road from SBL/SBR to SBL/SBR/SBR. Widen EB on SR-74 from EBL/EBT/EBT to EBL/EBL/EBT/EBT. Widen WB on SR-74 from WBT/WBTR to WBT/WBT/WBR.
Optimize signal timing.
d. Sherman Road/SR-74:

This intersection is located within the City of Menifee’s Connectivity Analysis Zone and is subject to further assessment for future planned improvements. The Project’s contribution toward the improvement at this intersection will be provided through a fair share payment of 3.52%.
Optimize signal timing.
No additional improvements are feasible due to right-of-way constraints. This intersection is located within the City of Menifee’s Connectivity Analysis Zone and is subject to further assessment for future planned improvements. e. Antelope Road/SR-74:

This intersection is located within the City of Menifee’s Connectivity Analysis Zone and is subject to further assessment for future planned improvements. The Project’s contribution toward the improvement at this intersection will be provided through a fair share payment of 5.04%.
Optimize signal timing.
No additional improvements are feasible due to right-of-way constraints. This intersection is located within the City of Menifee’s Connectivity Analysis Zone and is subject to further assessment for future planned improvements. f. Palomar Road/SR-74:

The Project’s contribution toward the improvement at this intersection will be provided through a fair share payment of 7.98%.
Widen EB approach on SR-74 from EBL/EBT/EBTR to EBL/EBT/EBT/EBTR. It should be noted that the receiving lane on the east leg of the intersection on SR-74 should also be widened to accommodate the additional lane. g. Palomar Road/Case Road:

Page 30 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 264

Menifee Mayor and City Council
December 3, 2025
Page
856 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 265

Menifee Mayor and City Council
December 3, 2025
Page
857 of 966

The Project’s contribution toward the improvement at this intersection will be provided through a fair share payment of 4.01%.
This intersection meets the CAMUTCD signal warrant during the AM and PM peak hour, installation of a traffic signal may be considered. Restripe SB on Palomar Road from SBRL to SBR/SBR/SBL.
Restripe EB on Case Road from EBTL to EBL/EBT. Protected-permissive phasing for the EBL.
Restripe WB on Case Road from WBTR to WBT/WBTR.
h. Menifee Road/SR-74:

The Project’s contribution toward the improvement at this intersection will be provided through a fair share payment of 1.50%.
Widen EB approach on SR-74 from EBL/EBT/EBTR to EBL/EBT/EBT/EBTR. It should be noted that the receiving lane on the east leg of the intersection on SR-74 should also be restriped to accommodate the additional lane. Widen SB on Menifee Road from SBTR/SBL to SBR/SBT/SBL/SBL. Add right-turn overlap phasing to NBR. Optimize signal timing.

12. Landscaping on Palomar Road - The parkway areas within the public right-of-way or landscape easements fronting the entire property along Palomar Road, shall be landscaped and irrigated per City standards and guidelines. These areas shall be maintained by the CFD.

13. Prior to issuance of the Grading Permit, all necessary easements and mapping for the Basin Area located within Lot A, in the northwest portion of the tract map, shall be processed and recorded. Additionally, appropriate easements and agreements shall be established between the relevant entities for the spillway connection to the Valley-Wide Basin associated with Tract 29495.

14. Prior to issuance of the Precise Grading Permit, an Encroachment Permit from the Riverside County Flood Control and Water Conservation District (RCFC & WCD) shall be obtained for the proposed RCFC line connection. This permit is required to connect the on- site basins to the existing 48-inch RCFC-maintained.

Page 31 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 266

Menifee Mayor and City Council
December 3, 2025
Page
858 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 267

Menifee Mayor and City Council
December 3, 2025
Page
859 of 966

General Conditions

1. All required public improvements must be constructed and accepted by the City prior to issuance of the first and any subsequent certificate of occupancy, unless approved by City Engineer/Public Works Director.

2. Engineering Design exceptions to City design standards and policies must be specifically requested in writing and approved by City Engineer/PW Director. Any design exceptions shown on the tentative map and associated engineering documents that are not specifically requested are not approved.

3. The developer is responsible to furnish & install one 2” and one 3” conduit for traffic signal interconnect and broadband purposes, per City of Menifee Standard Detail 1005, along all circulation element roads and intersections.

4.Subdivision Map Act – The developer / property owner shall comply with the State of California Subdivision Map Act and all other laws, ordinances, and regulations pertaining to the subdivision of land.

5.Mylars – All improvement plans and grading plans shall be drawn on twenty-four (24) inch by thirty-six (36) inch Mylar and signed by a licensed civil engineer and/or other registered/licensed professional as authorized by State law.

6.Guarantee for Required Improvements. Prior to grading permit issuance, construction permit issuance, and/or Final Map recordation, financial security or bonds shall be provided to guarantee the construction of all required improvements associated with each phase of construction, per the City’s municipal code.

7. The Public Works Director may require the dedication and construction of necessary utilities, streets, or other improvements outside the area of any particular map phase if the improvements are needed for circulation, drainage, parking, and access or for the welfare and safety of the public.

8.Bond Replacement, Reduction, and Releases - All requests for bond replacements (such as in changes of property ownerships), reductions (such as in partial completion of improvements), releases (such as in completion of improvements), shall conform to City policies, standards, and applicable City ordinances. It shall be the responsibility of the developer / property owner to notify the City in time when any of these bond changes are necessary. The City shall review all changes in Bond Agreements and the accompanying bonds or security.

9.Existing and Proposed Easements - The final grading plan and improvement plans shall correctly show all existing easements, traveled ways, drainage courses, and encumbrances. Any omission or misrepresentation of these documents may require said plan to be resubmitted for further consideration.

10.Engineered Plans - All improvement plans, and grading plans shall be drawn on twenty-four (24) inches by thirty-six (36) inch Mylar and signed by a licensed civil engineer or other registered/licensed professional as required.

Page 32 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 268

Menifee Mayor and City Council
December 3, 2025
Page
860 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 269

Menifee Mayor and City Council
December 3, 2025
Page
861 of 966

11.Plan Check Submittals – Appropriate plan check submittal forms shall be completed and submittal check list provided that includes required plan copies, necessary studies / reports, references, fees, deposits, etc. Prior to final approval of improvement plans by the Public Works / Engineering Department, the developer / property owner shall submit to the Public Works / Engineering Department CAD layers of all improvements to be maintained by the City (pavement, sidewalk, streetlights, etc.). A scanned image of all final approved grading and improvement plans on a Universal Serial Bus (USB) drive, also known as a “flash” drive or “thumb” drive, shall be submitted to the Public Works / Engineering Department, in one of the following formats: (a) Auto CAD DXF, (b) GIS shapefile (made up of ESRI extensions .shp, .shx and .dbf) or (c) Geodatabase (made up of ESRI extension .gdb). CAD files created with the latest version shall only be accepted if approved by the Public Works Director / City Engineer. GIS and ACAD files 2004 or later are required for all final maps upon approval.

12.Final Map Submittal Process – Appropriate final map plan check submittal forms shall be completed and appropriate fees or deposits paid. Prior to approval of the final map by the City Council, the developer / property owner shall provide along with the final map mylars, electronic files of the final map on Compact Disc (CD), in one of the following formats: (a) Auto CAD DXF, (b) GIS shapefile (made up of ESRI extensions .shp, .shx and .dbf) and (c) Geodatabase (made up of ESRI extension .gdb). CAD files created with the latest version shall only be accepted if approved by the Public Works Director / City Engineer.

13.Plan Approvals – Improvement plans and grading plans shall be submitted with necessary supporting documentation and technical studies (hydrology, hydraulics, traffic impact analysis, geotechnical studies, etc.) to the Public Works / Engineering Department for review and approval. All submittals shall be signed and date stamped by the Engineer of Record. The plans must receive Public Works / Engineering Department approval prior to issuance of any construction permit, grading permit, or building permits as applicable and as determined by the Public Works Director / City Engineer. All submittals shall include a completed City Fee or Deposit Based Worksheet and the appropriate plan check. For improvements proposed to be owned and maintained by the Riverside County Flood Control and Water Conservation District, improvement plans must receive district approval prior to Building permit issuance or as determined by the District.

All required improvement plans, and rough grading plans must be approved by the Public Works Engineering Department prior to recordation of a final map for which the improvements are required. Rough grading, Hydrology Report, and WQMP Report must be approved prior to grading permit. Public Improvement Plans must be approved prior to map recordation. All required CFD landscape plans must be approved prior to building permit issuance.

14.As-Built Plans – Upon completion of all required improvements, the developer/property owner shall cause the civil engineer of record to as-built all project plans, and submit project base line of work for all layers on a USB drive to the Public Works / Engineering Department, in one of the following formats: (a) Auto CAD DXF, (b) GIS shapefile (made up of ESRI extensions .shp, .shx and .dbf) or (c) Geodatabase (made up of ESRI extension .gdb). The timing for submitting the as-built plans shall be as determined by the Public Works Director / City Engineer.

Page 33 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 270

Menifee Mayor and City Council
December 3, 2025
Page
862 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 271

Menifee Mayor and City Council
December 3, 2025
Page
863 of 966

15. Construction Times of Operation. The developer / property owner shall monitor, supervise, and control all construction and construction related activities to prevent them from causing a public nuisance including, but not limited to, strict adherence to the following:
a. Construction activities shall comply with City of Menifee ordinances relating to construction noise. Any construction within the City limits located 1/4 of a mile from an occupied residence shall be permitted Monday through Saturday, except on nationally recognized holidays, 7:00 a.m. to 7:00 p.m. in accordance with Municipal Code Section 8.01.020. There shall be no construction permitted on Sunday or nationally recognized holidays unless prior approval is obtained from the City Building Official or City Engineer.
b. Removal of spoils, debris, or other construction materials deposited on any public street no later than the end of each working day.
c. The construction site shall accommodate the parking of all motor vehicles used by persons working at or providing deliveries to the site. Violation of any condition or restriction or prohibition set forth in these conditions shall subject the owner, applicant to remedies as set forth in the City Municipal Code. In addition, the Public Works Director / City Engineer or the Building Official may suspend all construction related activities for violation of any condition, restriction or prohibition set forth in these conditions until such a time it has been determined that all operations and activities are in conformance with these conditions.
d. A Pre-Construction meeting is mandatory with the City’s Public Works Inspection team prior to permit issuance and the start of any construction activities for this site.

16. Dry Utility Installations - Electrical power, telephone, communication, traffic signal, street lighting, and cable television conduits and lines shall be placed underground in accordance with current City Ordinances 460 and 461, and as approved by the Public Works Director / City Engineer. This applies also to existing overhead lines which are

33.6 kilovolts or below along the project frontage and within the project boundaries. In cases where 33.6kV or below lines are collocated with high voltage lines (for example, 115kV), the low voltage lines shall be placed underground even when the high voltage lines are exempt from relocation or undergrounding in accordance with City standards and ordinances. Exemption from undergrounding low voltage lines shall only be by the Public Works Director / City Engineer or as directed by the City Council.

17. All grading activities shall conform to the latest adopted edition of the California Building Code, City Grading Ordinance, Chapter 8.26, applicable City design standards and specifications, City ordinances, policies, rules and regulations governing grading in the City.

18. Regulations and Ordinance on Grading Within the City – In addition to compliance with City Chapter 8.26, grading activities shall also conform to the latest edition of the California Building Code, City General Plan, other City Ordinances, City design standards and specifications and all other relevant laws, rules and regulations governing grading in the City of Menifee. Prior to commencing any grading, clearing, grubbing or any topsoil disturbances, the applicant shall obtain a grading permit from the Public Works / Engineering Department. Grading activities that are exempt from a

Page 34 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 272

Menifee Mayor and City Council
December 3, 2025
Page
864 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 273

Menifee Mayor and City Council
December 3, 2025
Page
865 of 966

grading permit as outlined by the City ordinance may still require a grading permit by the Public Works Director / City Engineer when deemed necessary to prevent the potential for adverse impacts upon drainage, sensitive environmental features, or to protect property, health safety, and welfare.

19. Dust Control – All necessary measures to control dust shall be implemented by the developer during grading. Fugitive dust shall be controlled in accordance with Rule 403 of the California Air Quality Control Board.

20. 2:1 Maximum Slope - Graded slopes shall be limited to a maximum steepness ratio of 2:1 (horizontal to vertical) unless otherwise approved by the Public Works / Engineering Department.

21. Slope Setbacks – Observe slope setbacks from buildings and property lines per the California Building Code and City ordinance on grading.

22. Slope Landscaping and Irrigation – All slopes greater than or equal to 3 feet in vertical height shall be irrigated and landscaped with grass or ground cover. All manufactured slopes shall be irrigated and landscaped with grass or approved ground cover, and shall have some type of drainage swale at the toe of the slope to collect runoff. Slopes exceeding 15 feet in vertical height shall be irrigated and planted with shrubs and/or trees per City Grading Ordinance Chapter 8.26. Drip irrigation shall be used for all irrigated slopes.

23. Slope Erosion Control Plan - Erosion control and/or landscape plans are required for manufactured slopes greater than 3 feet in vertical height. The plans shall be prepared and signed by a licensed landscape architect and bonded per applicable City ordinances.

24. Slope Stability Report – A slope stability report shall be submitted to the Public Works / Engineering Department for all proposed cut and fill slopes steeper than 2:1 (horizontal:vertical) or over 20 feet in vertical height, unless addressed in a previously city approved report.

25. Erosion Control Plans – All grading plans shall require erosion control plans prior to approval. Temporary erosion control measures shall be implemented immediately following rough grading to prevent deposition of debris onto downstream properties or drainage facilities. Plans showing erosion control measures may be included as part of the grading plans or submitted as a separate set of plans for city review and approval.

Graded but undeveloped land shall provide, in addition to erosion control planting, any drainage facilities deemed necessary to control or prevent erosion. Erosion and sediment control BMPs are required year-round in compliance with all applicable City of Menifee Standards and Ordinances and the National Pollutant Discharge Elimination System (NPDES) Municipal Separate Storm Sewer System (MS4) Permit from the California State Water Resources Control Board (SWRCB). Additional Erosion protection may be required during the rainy season.

26. Water Quality Management Plan (WQMP) - All grading plans shall require an approved copy of the Water Quality Management Plan sheet per the approved WQMP, executed report. The developer / property owner shall comply with the requirements

Page 35 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 274

Menifee Mayor and City Council
December 3, 2025
Page
866 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 275

Menifee Mayor and City Council
December 3, 2025
Page
867 of 966

of the WQMP report, the NPDES municipal permit in force, and City standards and specifications.

27. Design Grade Criteria – Onsite parking areas shall be designed in accordance with the current version of City of Menifee Standards and Specifications. Non-compliance may require a redesign of the project. Significant redesigns may require a revised Plot Plan.
a. On-Site Parking – Where onsite parking is designed, such as in common areas, parking stalls and driveways shall not have grade breaks exceeding 4%. A 50’ minimum vertical curve shall be provided where grade breaks exceed 4%. Five percent grade is the maximum slope for any parking area.

Where ADA requirement applies, ADA requirement shall prevail. b. Down Drains - Concrete down drains that outlet onto parking lot areas are not allowed. Drainage that has been collected in concrete ditches or swales should be collected into receiving underground drainage system, or should outlet with acceptable velocity reducers into BMP devises. c. Pavement - Permeable pavement requires the layers of filter material to be installed relatively flat. As such, the permeable pavement areas should have a maximum surface gradient of 2%,or approved by the PW Director/City Engineer.

28. Drainage Grade - Minimum drainage design grade shall be 1% except on Portland cement concrete surfaces where 0.35% shall be the minimum. The engineer of record must submit a variance request for design grades less than 1% with a justification for a lesser grade.

29. Finish Grade – Shall be sloped to provide proper drainage away from all exterior foundation walls in accordance with City of Menifee Standard Plan 300.

30. Use of Maximum and Minimum Grade Criteria – Actual field construction grades shall not exceed the minimum and maximum grades for ADA and approved project grading design, to allow for construction tolerances. Any improvement that is out of the minimum and maximum values will not be accepted by the City Inspector and will need to be removed and replaced at developer’s or owner’s expense.

31. Licensed Geotechnical Engineer - A California licensed Geotechnical Engineer shall perform final determination of the foundation characteristics of soils within on-site development areas, and per the approved geotechnical report reviewed and approved by the City.

32. Retaining Walls – Sections, which propose retaining walls, will require separate permits. They shall be obtained prior to issuance of any other building permits – unless otherwise approved by the Building Official and/or the Public Works Director / City Engineer. The walls shall be designed by a licensed civil engineer and conform to City Standards. The plans shall include plan and profiles sheets.

33. Trash Racks: Trash Racks shall be installed at all inlet structures that collect runoff from open areas with potential for large, floatable debris.

34. Drainage Runoff Emergency Escape. An emergency escape path shall be provided for the stormwater runoff at all inlets for the proposed underground facilities in the event

Page 36 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 276

Menifee Mayor and City Council
December 3, 2025
Page
868 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 277

Menifee Mayor and City Council
December 3, 2025
Page
869 of 966

that the inlets become blocked in any way. To prevent flood damage to the proposed structures, all proposed structures in the vicinity of the inlets and along the emergency escape path shall be protected from flooding by either properly elevating the finished floor in relation to the inlets and flow path or by making sure the structures are set back from the inlets to provide adequate flow through area in the event the emergency escape of the stormwater runoff is necessary.

35. Riverside County Flood Control and Water Conservation District (RCFCWCD) Encroachment Permit Required. An Encroachment Permit Is required for any work within District right of way or any connection to District facilities. The Encroachment Permit application shall be processed and approved concurrently with the improvement plans.

36. RCFCWCD Submittal of Plans. A copy of the project specific WQMP, improvement plans, grading plans, BMP improvement plans and any other necessary documentation along with supporting hydrologic and hydraulic calculations (drainage report) shall be submitted to the District as reference material for the review and approval of the final drainage report and storm drain plans that propose construction of storm drain facilities that will be owned and maintained by the District.

37. Grading Permit for Clearing and Grubbing – City ordinance on grading requires a grading permit prior to clearing, grubbing, or any topsoil disturbances related to construction grading activities.

38. Compliance with NPDES General Construction Permit – The developer/property owner shall comply with the National Pollutant Discharge Elimination System (NPDES) General Construction Permit (GCP) from the State Water Resource Control Board (SWRCB). This is in addition to the Municipal permit governing design, WQMPs, and permanent BMPs.

Prior to approval of the grading plans or issuance of any grading permit, the developer/property owner shall obtain a GCP from the SWRCB. Proof of filing a Notice of Intent (NOI) and monitoring plan, shall be submitted to the City; and the WDID number issued by the SWRCB shall be reflected on all grading plans prior to approval of the plans.

For additional information on how to obtain a GCP, contact the SWRCB.

39. SWPPP - Prior to approval of the grading plans, the developer/property owner shall prepare a Storm Water Pollution Prevention Plan (SWPPP) for the development. The developer/property owner shall be responsible for uploading the SWPPP into the State’s SMARTS database system and shall ensure that the SWPPP is updated to constantly reflect the actual construction status of the site. A copy of the SWPPP shall be made available at the construction site at all times until construction is completed.

The SWRCB considers a construction project complete once a Notice of Termination has been issued by SWRCB. The City will require submittal of NOTs for requests to fully release associated grading bonds.

40. SWPPP for Inactive Sites – The developer/property owner shall be responsible for ensuring that any graded area that is left inactive for a long period of time has appropriate SWPPP BMPs in place and in good working conditions at all times until construction is completed and the Regional Board has issued a Notice of Termination (NOT) for the development.

Page 37 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 278

Menifee Mayor and City Council
December 3, 2025
Page
870 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 279

Menifee Mayor and City Council
December 3, 2025
Page
871 of 966

41. Import/Export – In instances where a grading plan involves import or export, prior to obtaining a grading permit, the developer/property owner shall have obtained approval for the import/export location from the Public Works / Engineering Department. If an Environmental Assessment did not previously approve either location, a Grading Environmental Assessment shall be submitted to the Planning Director for review and comment and to the Public Works Director / City Engineer for approval. Additionally, if the movement of import/export occurs using City roads, review, and approval of the haul routes by the Public Works / Engineering Department will be required. Import or export materials shall conform to the requirements of Chapter 8.26.

42. Offsite Grading Easements - Prior to recordation of a final map phase, or the issuance of a grading permit within a phased map whichever occurs first, the developer/property owner shall obtain all required easements and/or permissions to perform offsite grading, from affected landowners. Notarized and recorded agreement or documents authorizing the offsite grading shall be submitted to the Public Works Engineering Department.

43. Offsite Property and Right of Way – The developer / property owner shall be responsible for acquiring any offsite real property interests that may be required in connection with the development project. Prior to recordation of a final map, or the issuance of grading permit, whichever occurs first, the developer shall obtain all required ROW, easements and / or permissions to perform offsite grading, from all affected landowners.

44. Increased Runoff Criteria. The development of this site would increase peak flow rates on downstream properties. Mitigation shall be required to offset such impacts. An increased runoff basin should be shown on the exhibit and calculations supporting the size of the basin shall be submitted to the District and the City for review. The entire area of proposed development will be routed through a detention facility(s) to mitigate increased runoff. All basins must have positive drainage; dead storage basins shall not be acceptable.

A complete drainage study including, but not limited to, hydrologic and hydraulic calculations for the proposed detention basin shall be submitted to the City for review and approval. For design purposes, the proposed detention basin shall be sized using the 6-hour/100-year frequency storm event. Detention basin(s) and outlet(s) sizing will ensure that this storm event does not produce higher peak discharge in the "after" condition than in the "before" condition. For the 100-year event, an AMC II shall be used together with a constant loss rate.

Low Loss rates will be determined using the following:
a. Undeveloped Condition --> LOW LOSS = 90%
b. Developed Condition --> LOW LOSS = .9 - (.8x%IMPERVIOUS) c. Basin Site --> LOW LOSS = 10%
Where possible and feasible the onsite flows should be mitigated before combining with offsite flows to minimize the size of the detention facility required. If it is necessary to combine offsite and onsite flows into a detention facility two separate conditions should be evaluated for each duration/return period/before-after

Page 38 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 280

Menifee Mayor and City Council
December 3, 2025
Page
872 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 281

Menifee Mayor and City Council
December 3, 2025
Page
873 of 966

development combination studied; the first for the total tributary area (offsite plus onsite), and the second for the area to be developed alone (onsite). It must be clearly demonstrated that there is no increase in peak flow rates under either condition (total tributary area or onsite alone), for each of the return period/duration combinations required to be evaluated. A single plot showing the pre-developed, post-developed and routed hydrographs for each storm considered, shall be included with the submittal of the hydrology study.

No outlet pipe(s) will be less than 18" in diameter. Where necessary an orifice plate may be used to restrict outflow rates. Appropriate trash racks shall be provided for all outlets less than 48" in diameter.

The basin(s) and outlet structure(s) must be capable of passing the 100-year storm without damage to the facility. Mitigation basins should be designed for joint use and be incorporated into open space or park areas. Side slopes should be no steeper than 4: 1 and depths should be minimized where public access is uncontrolled.

Mitigation basins should be designed for joint use and maybe incorporated into open space or park areas. Side slopes should be not steeper than 4: I and depths should be minimized where public access is uncontrolled. At least 50% of the basin facility perimeter shall have interior side slopes no more than 4:1 slope and in no case steeper than 2:1 slope, even if fenced.

A viable maintenance mechanism, acceptable to the City should be provided for any flood control facilities to be owned and maintained by the City. Any facilities proposed to be owned by the District, should be provided with a viable maintenance mechanism acceptable to the City and the District. For the City this would be the citywide CFD.

Facilities to remain private shall be maintained by commercial property owners association or homeowners associations.

45. Site Drainage - Positive drainage of the site shall be provided, and water shall not be allowed to pond behind or flow over cut and fill slopes. Where water is collected and discharged in a common area, protection of the native soils shall be provided by planting erosion resistant vegetation, as the native soils are susceptible to erosion by running water. All cut and fill slopes shall have a maximum 2:1 (H:V) grade, 2 horizontal to 1 vertical.

46. Alteration of Drainage Patterns – Prior to grading permit issuance or approval of improvement plans, the final engineering plans submitted by the applicant shall address the following: The project drainage system shall be designed to accept and properly convey all on- and off-site drainage flowing on or through the site. The project drainage system design shall protect downstream properties from any damage caused by alteration of drainage patterns such as concentration or diversion of flow. Concentrated drainage on commercial lots shall be diverted through parkway drains under sidewalks.

47. FEMA Flood Zone Requirements – In the event where the project falls within a FEMA Floodplain (Zones A, V, A99) / Regulatory Floodway (Zone AE, AO, AH, VE, AR), the project shall be required to either process a CLOMR/LOMR or a “No Rise Certificate”. If applicable, CLOMR / “No Rise Certificate” shall be required to be approved prior to

Page 39 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 282

Menifee Mayor and City Council
December 3, 2025
Page
874 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 283

Menifee Mayor and City Council
December 3, 2025
Page
875 of 966

grading permit issuance, and the LOMR shall be required to be approved prior to building permit issuance.

48. 100 Year Storm- The 100-year storm flow shall be contained within the street top of curb.

49. 100 Year Drainage Facilities - All drainage facilities shall be designed to accommodate 100-year storm flows as approved by the City of Menifee Public Works / Engineering Department.

50. 100 Year Design Criteria - In final engineering and prior to grading permit issuance, subsurface storage systems shall be designed with emergency overflow inlets to mitigate flows in excess of the 100-year storm event in a controlled manner to the satisfaction of the Public Works / Engineering Department.

51. 100 Year Sump Outlet - Drainage facilities outletting sump conditions shall be designed to convey the tributary 100-year storm flows. Additional emergency escape shall also be provided.

52. Coordinate Drainage Design: Development of this property shall be coordinated with the development of adjacent properties to ensure that watercourses remain unobstructed, and stormwaters are not diverted from one watershed to another. This may require the construction of temporary drainage facilities or offsite construction and grading. A drainage easement shall be obtained from the affected property owners for the release of concentrated or diverted storm flows. A copy of the recorded drainage easement shall be submitted to the PW Engineering Department for review.

53. Comingling of Flows. Site restrictions may require the comingling of onsite and offsite flows. A treatment device approved by the City of Menifee Public Works Director shall be utilized to pretreat the flows before entering HOA facilities. The WQMP will need to show these catch basin inserts. This comingling of flows and the easement shall also be clarified in the CC&Rs for the project. If site restrains and existing conditions require said comingling, it will be the obligation of the HOA to accept this water and maintain the system, as well as performing maintenance on the associated filter inserts. The developer shall provide a storm drain and flowage easement, or other applicable document approved by the city of Menifee, providing the right of the city to drain onto the private property.

54. Interceptor Drain Criteria/Guidelines: The criteria for maintenance access of terrace/interceptor is as follows: flows between 1-5 cfs shall have a 5-foot wide access road, flows between 6-10 cfs shall be a minimum 6-foot rectangular channel.

Terrace/interceptor drains are unacceptable for flows greater than 10 cfs. Flows greater than 10 cfs shall be brought to the street. These guidelines may be modified by the City Engineer/PW Director.

55. BMP – Energy Dissipators: Energy Dissipators, such as rip-rap, shall be installed at the outlet of a storm drain system that discharges runoff flows into a natural channel or an unmaintained facility. The dissipators shall be designed to minimize the amount of erosion downstream of the storm drain outlet.

Page 40 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 284

Menifee Mayor and City Council
December 3, 2025
Page
876 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 285

Menifee Mayor and City Council
December 3, 2025
Page
877 of 966

45.Trash Racks – Trash Racks shall be installed at all inlet structures that collect runoff from open areas with potential for large, floatable debris.

46.Perpetuate Drainage Patterns. The property's street and lot grading shall be designed in a manner that perpetuates the existing natural drainage patterns with respect to tributary drainage areas, outlet points and outlet conditions. Otherwise, a drainage easement shall be obtained from the affected property owners for the release of concentrated or diverted storm flows. A copy of the recorded drainage easement shall be submitted to the City for review and approval.

47.Perpetual Drainage Patterns (Easements) - Grading shall be designed in a manner that perpetuates the existing natural drainage patterns and conditions with respect to tributary drainage areas and outlet points. Where these conditions are not preserved, necessary drainage easements shall be obtained from all affected property owners for the release onto their properties of concentrated or diverted storm flows. A copy of the recorded drainage easement shall be submitted to the PW Engineering Department for review.

48. Protection of Downstream Properties - The developer/property owner shall protect downstream properties from damages that can be caused by alteration of natural drainage patterns, i.e., concentration or diversion of flow. Protection shall be provided by constructing adequate drainage facilities including enlarging existing facilities and securing necessary drainage easements.

49. Storm Drain Lines 36” and larger - All proposed storm drain lines greater than 36" in diameter may be considered for ownership and maintenance by the Flood Control District. The applicant shall enter into a cooperative agreement with the Flood Control District regarding the terms of the design, construction and operation of facilities proposed for ownership by the Flood Control District.

50. No Building Permit without Legal Lot – Prior to issuance of any building permit, the developer / property owner shall ensure that the underlying parcels for such buildings are complying with City Ordinances, Codes, and the Subdivision Map Act.

51. No Building Permit Prior to Subdivision Map Recordation – Prior to issuance of building permit for any occupied structure, the developer / property owner shall record the Subdivision Map. Model Homes are exempt from this requirement.

52. No Building Permit without Grading Permit - Prior to issuance of any building permit for any new structure or appurtenance, the developer/property owner shall obtain a grading permit and/or approval to construct from the Public Works Engineering Department.

53. Final Rough Grading Conditions – Prior to issuance of each building permit, the developer/property owner shall cause the Civil Engineer of Record and Soils Engineer of Record for the approved grading plans, to submit signed and wet stamped rough grade certification and compaction test reports with 90% or better compaction. The certifications shall use City approved forms and shall be submitted to the Public Works Engineering Department for verification and acceptance.

Page 41 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 286

Menifee Mayor and City Council
December 3, 2025
Page
878 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 287

Menifee Mayor and City Council
December 3, 2025
Page
879 of 966

56. Conformance to Elevations/Geotechnical Compaction - Rough grade elevations for all building pads and structure pads submitted for grading plan check approval shall be in substantial conformance with the elevations shown on approved grading plans.

Compaction test certification shall be in compliance with the approved project geotechnical/soils report.

57. Final Grade Certification – The developer/property owner shall cause the Civil Engineer of Record for approved grading plans, to submit signed and wet stamped final grade certification on City-approved form, for each building requesting a certificate of occupancy. The certification shall be submitted to the Public Works Engineering Department for verification and acceptance.

58. Conform to Elevations - Final grade elevations of all building or structure finish floors submitted for grading plan check approval shall be in substantial conformance with the elevations shown on the approved grading plans. Compaction test certification shall be in compliance with the approved project geotechnical/soils report.

59. Plant & Irrigate Slopes – All manufactured slopes shall be irrigated and landscaped with grass or approved ground cover and shall have some type of drainage swale at the toe of the slope to collect runoff. Slopes greater than or equal to 3’ in vertical height shall have erosion control measures provided. Slopes that exceed 15’ in vertical height are to be planted with additional shrubs and trees as approved by the Public Works / Engineering Department. Drip irrigation shall be provided for all irrigated slopes.

60. Common Area Maintenance – Any common areas identified on the tentative map shall be owned and maintained through a permanent master maintenance organization shall be established for the project, to assume maintenance responsibility for all common areas. The organization may be public (City CFD, or another agency) or private (e.g., property owners’ association). Merger with an area-wide or regional organization shall satisfy this condition provided that such organization is legally and financially capable of assuming the responsibilities for maintenance. When necessary, property dedication or easement dedications shall be granted to the maintenance organization through map dedication, or separate recordable instrument, and shall be in a form acceptable to the city.

61. Maintenance Exhibit – Prior to final map recordation, the developer / property owner shall prepare an exhibit that shows all open space lots within the project development tract and the maintenance entity for each lot. The exhibit shall be reviewed and approved by the Community Development Department and the Public Works / Engineering Department.

62. Conditions, Covenants and Restrictions (Private Common Areas) – In the event that the Community Facilities District will not maintain all common areas, the establishment of a property owner association (POA or HOA) shall be the mechanism to maintain such common areas.

63. CC&R Content, Submittal Process and Timing – The developer/property owner shall submit to the Public Works / Engineering Department for review and approval CC&R documents consisting of the following:

Page 42 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 288

Menifee Mayor and City Council
December 3, 2025
Page
880 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 289

Menifee Mayor and City Council
December 3, 2025
Page
881 of 966

a. One hard copy and an electronic version of the CC&R’s. A completed application form to review the CC&Rs, available at the Public Works / Engineering front counter. There is a fee associated with the application and required backup documents to review. The declaration of CC&R’s shall:
i. provide for the establishment of a property owner's association, ii. provide for the ownership of the common area by the property owner's association,
iii. contain provisions approved by the Public Works / Engineering Department, Community Development Department, and the City Attorney,
iv. Contain provisions with regards to the implementation of post development Water Quality Best Management Practices identified in the project’s approved WQMP.
v. Contain provisions notifying initial occupants, or tenants of the project of their receipt of educational materials on good housekeeping practices which contribute to the protection of storm water quality. These educational materials shall be distributed by the property owners' association and/or the developer.
vi. Contain provisions for allowing the City a Right of Entry to maintain BMPs that are otherwise not maintained by responsible property owners. If a separate Right of Entry Agreement has been executed, this provision is not necessary to be in the CC&Rs.
b. As part of the CC&R document submittal, exhibit(s) identifying the areas or improvements that will be maintained by the POA, the CFD or other entities shall be provided. The exhibit shall be reviewed and approved by the City. c. Once approved, the developer / property owner shall provide a hard copy of the CC&R’s wet-signed and notarized to the Public Works / Engineering Department. The Public Works / Engineering Department shall record the original declaration of CC&R’s prior to building permit issuance. d. A deposit to pay for the review of the CC&Rs pursuant to the City’s current fee schedule at the time the above-referenced documents are submitted to the Public Works / Engineering Department.

73. Street Design Standards – Street improvements shall conform to all applicable City Design Standards and Specifications, the City General Plan, Ordinances, and all other relevant laws, rules and regulations governing street construction in the City.

74. Concrete Work – All concrete work including curbs, gutters, sidewalks, driveways, cross gutters, catch basins, manholes, vaults, etc. shall be constructed to meet a 28- day minimum concrete strength of 3,250 psi.

75. Intersection Geometrics – All final intersection geometrics may be modified in final engineering as approved by the Public Works Director / City Engineer.

Page 43 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 290

Menifee Mayor and City Council
December 3, 2025
Page
882 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 291

Menifee Mayor and City Council
December 3, 2025
Page
883 of 966

76. Intersection / 50-Foot Tangent – All centerline intersections shall be at ninety (90) degrees, plus or minus five (5) degrees, with a minimum fifty (50) foot tangent, measured from flow line / curb face or as approved by the Public Works Director / City Engineer.

77. Street Improvements – Street improvements shall conform to all applicable City Design Standards and Specifications, the City General Plan, and all other relevant laws, rules and regulations governing street construction in the City.

78. Soils and Pavement Report - Street pavement structural designs shall comply with the recommendations in the City approved project soils and pavement investigation report, and must meet minimum City standards and specifications, as approved by the Public Works Director / City Engineer. R-Values shall be provided in said report and the Engineer of Record shall provide pavement calculations to the City.

79. Driveways - Final driveway geometrics may be modified in final engineering as approved by the Public Works Director / City Engineer. Driveways shall meet current standard radii on all existing and proposed commercial drive approaches used as access to the proposed development. The developer shall adhere to all City standards and regulations for access and ADA guidelines.

80. Acceptance of Public Roadway Dedication and Improvements – Easements and right-of way for public roadways shall be granted to the City through acceptable recordable instrument. Onsite easements and right-of way for public roadways shall be granted to the City of Menifee through the final map, or other acceptable recordable instrument. Any off-site rights-of-way required for access road(s) shall be accepted to vest title in the name of the public if not already accepted. Any shared access roads necessary for the adequate circulation of the proposed project, shall be dedicated for reciprocal access by acceptable recordable instrument prior to any permit issuance.

81. ADA Compliance – ADA path of travel shall be designed at the most convenient accesses and the shortest distance to the buildings in accordance with ADA design standards and to the satisfaction of the Public Works Director / City Engineer and the City Building Official.

82. Paving or Paving Repairs – The applicant shall be responsible for obtaining the paving inspections required by Ordinance 461 and City of Menifee standards and ordinances. Paving and/or paving repairs for utility street cuts shall be per City of Menifee Standards and Specifications and as approved by the Public Works Director / City Engineer.

83. Street Lights – The developer/property owner shall install street lights along the project frontage in accordance with City Standards. Street lights requiring relocations, or any required new streetlights shall be designed in accordance with current City Standards for LS-3 type streetlights. Street light construction plans shall be prepared as separate plans or combined with the public street improvement plans as approved by the Public Works Director / City Engineer.

84. Public Streetlights Service Points – All proposed public streetlights shall be provided with necessary appurtenances and service points for power, separate from privately owned streetlights. The developer/property owner shall coordinate with the PW

Page 44 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 292

Menifee Mayor and City Council
December 3, 2025
Page
884 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 293

Menifee Mayor and City Council
December 3, 2025
Page
885 of 966

Department and with Southern California Edison the assignment of addresses to streetlight service points. Service points for proposed public streetlights shall become public and shall be located within public right of way or within duly dedicated public easements.

54. CFD Maintenance - The property owner shall file for annexation or inclusion into the Citywide Community Facilities Maintenance District, CFD for street sweeping services, street pavement maintenance, landscaping, street lighting, etc.

55. Offsite Grading – A notarized and recorded agreement, or City-approved documents authorizing the offsite grading shall be submitted to the Public Works / Engineering Department.

56. Sight Distance Analysis – Sight distance analysis shall be conducted at all project roadway entrances for conformance with City sight distance standards. The analysis shall be reviewed and approved by the Public Works Director / City Engineer, and shall be incorporated in the final the grading plans, street improvement plans, and landscape improvement plans.

57. Street Name Sign - The developer/property owner shall install street name sign(s) in accordance with applicable City Standards, or as directed by the PW Engineering Department.

58. Driveway Geometrics- Final driveway geometrics may be modified in Final Engineering as approved by the Public Works Director. Driveways shall meet current standard radii on all existing and proposed commercial drive approaches used as access to the proposed development. The developer shall adhere to all City standards and regulations for access and ADA guidelines.

59. Construction Traffic Control Plan - Prior to start of any project related construction, the developer/property owner shall submit to the Public Works Engineering Department for review and approval, a Construction Traffic Control Plan in compliance with all applicable City ordinances, standards and specifications, and the latest edition of the CAMUTCD.

This traffic control plan shall address impacts from construction vehicular traffic, noise, and dust and shall propose measures to mitigate these effects. The traffic control plan shall include a Traffic Safety Plan for safe use of public roads right-of-way during construction.

60. Traffic Signal Control Devices – All new traffic signals and traffic signal modifications required for construction by this development project shall include traffic signal communication infrastructure, network equipment, and Advanced Traffic Management System (ATMS) license software. Said traffic signal control devices shall be submitted with the traffic signal design plans and shall be approved by the Public Works Director / City Engineer, prior to testing of a new traffic signal. Traffic signal poles shall be placed at the ultimate locations when appropriate.

61. Cost participation through Payment of TUMF and DIF for Improvements- The developer/property owner’s TUMF and DIF payment obligations shall be considered as cost participation for Project’s required offsite improvements only when the offsite improvements for which credits are claimed, are eligible TUMF and/or DIF facilities at time of TUMF and DIF payments. Determination for TUMF credits shall be at the

Page 45 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 294

Menifee Mayor and City Council
December 3, 2025
Page
886 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 295

Menifee Mayor and City Council
December 3, 2025
Page
887 of 966

discretion of the Western Riverside Council of Governments (WRCOG), the governing authority, which shall include entering a three party TUMF Credit Agreement with the developer, WRCOG and the City of Menifee.

62. Improvement Bonds – Prior to improvement plan approval and issuance of any construction permit for all required onsite and offsite public improvements, the developer/project owner shall enter into a bond agreement and post acceptable bonds or security, to guarantee the completion of all required improvements. The bonds shall be in accordance with all applicable City ordinances, resolutions, and municipal codes.

63. Encroachment Permits – The developer/property owner shall obtain all required encroachment permits and clearances prior to start of any work within City, State, or local agency right-of-way.

64. Stormwater Management - All City of Menifee requirements for NPDES and Water Quality Management Plans (WQMP) shall be met per City of Menifee Municipal Code Chapter 15.01 for Stormwater/Urban Runoff Management Program unless otherwise approved by the Public Works Director/City Engineer. This project is required to submit a project specific WQMP prepared in accordance with the latest WQMP guidelines approved by the Regional Water Quality Control Board.

65. WQMP Right of Entry and Maintenance Agreement: Prior to, or concurrent with the approval of the FINAL WQMP, the developer/property owner shall record and enter into an acceptable “Water Quality Management Plan and Stormwater Best Management Practices Operation, Transfer, Maintenance and Right of Entry Agreement” with the City to inform future property owners of the requirement to perpetually implement the approved FINAL WQMP.

66. SWRCB, TRASH AMENDMENTS. SWRCB, TRASH AMENDMENTS - The State Water Resources Control Board (State Board) adopted amendments to the Water Quality Control Plan for Ocean Waters of California and the Water Quality Control Plan for Inland Surface Waters, Enclosed Bays, and Estuaries – collectively referred to as the “Trash Amendments.” Applicable requirements per these amendments shall be adhered to with implementation measures, prior to building permit issuance. Projects determined to be within Priority Land Uses as defined in the Trash Amendments, shall provide trash full capture devices in all new and existing catch basins to which this development will be tributary to or receiving from all Priority Land Use areas that will contribute storm water runoff to the City of Menifee’s MS4. All trash full capture devices shall be listed on the State Board’s current list of certified full capture devices posted on their website
(https://www.waterboards.ca.gov/water_issues/programs/stormwater/trash_implemen tation.shtml), or otherwise approved by State or Regional Water Quality Control Board staff. Storm water runoff from privately owned Priority Land Use areas shall be treated by full capture devices located within privately owned storm drain structures or otherwise located on the privately owned property, whenever possible. Runoff from Priority Land Use areas created or modified by the project, and which are proposed to be City owned, shall be treated by full capture devices located within city-owned storm drains or otherwise located within the public right of way.

Page 46 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 296

Menifee Mayor and City Council
December 3, 2025
Page
888 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 297

Menifee Mayor and City Council
December 3, 2025
Page
889 of 966

Existing and proposed catch basins shall be retrofitted with a catch basin insert device selected from the list of approved devices by the Santa Ana Regional Water Quality Control Board, and compliant with the State-wide Trash TMDL.

The State Water Resources Control Board, Resolution adopted an amendment to the Water Quality Control Plan for ocean waters of California to control trash, and Part 1 Trash Provisions of the Water Quality Control Plan for inland surface waters, enclosed bays, and estuaries of California. Applicable requirements per these amendments shall be adhered to with implementation measures, prior to building permit issuance. Projects determined as within Priority Land Uses as defined in the amendment, shall provide full trash capture devices in all new catch basins and existing catch basins to which this development will be tributary to. Devices shall meet the requirement of the new Trash Amendment.

98. Prior to issuance of a grading permit, a FINAL project specific WQMP in substantial conformance with the approved PRELIMINARY WQMP, shall be reviewed and approved by the Public Works Engineering Department. Final construction plans shall incorporate all the structural BMPs identified in the approved FINAL WQMP. The final developed project shall implement all structural and non-structural BMPs specified in the approved FINAL WQMP. One copy of the approved FINAL WQMP on a CD-ROM in pdf format shall be submitted to the Public Works Engineering Department. The FINAL WQMP submittal shall include at the minimum the following reports/studies:
d. Hydrology/hydraulics report
e. Soils Report that includes soil infiltration capacity f. Limited Phase II Environmental Site Assessment Report, as may be required by an approved Phase I ESA Report
Final construction plans shall incorporate all the structural BMPs identified in the approved FINAL WQMP. The final developed project shall implement all structural and non-structural BMPs specified in the approved FINAL WQMP. One copy of the approved FINAL WQMP on a CD-ROM in pdf format shall be submitted to the Public Works Engineering Department.

99. Revising The Final WQMP - In the event the Final WQMP requires design revisions that will substantially deviate from the approved Prelim WQMP, a revised or new WQMP shall be submitted for review and approval by the Public Works / Engineering Department. The cost of reviewing the revised/new WQMP shall be charged on a time and material basis. The fixed fee to review a Final WQMP shall not apply, and a deposit shall be collected from the applicant to pay for reviewing the substantially revised WQMP.
100. Implement Project Specific WQMP - All structural BMPs described in the project- specific WQMP shall be constructed or installed and operational in conformance with approved plans and specifications. It shall be demonstrated that the applicant is prepared to implement all BMPs described in the approved project specific WQMP and that copies of the approved project-specific WQMP are available for the future owners/occupants. The City will not release occupancy permits for any portion of the project or subdivision map phase until all proposed BMPs described in the approved project specific WQMPs, to which the portion of the project is tributary to, are completed and operational.

Page 47 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 298

Menifee Mayor and City Council
December 3, 2025
Page
890 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 299

Menifee Mayor and City Council
December 3, 2025
Page
891 of 966

The City will not release occupancy permits for any portion of the project, or any proposed map phase prior to the completion of the construction of all required structural BMPs, and implementation of non-structural BMPs.
101. Inspection of BMP Installation – Prior to issuance of Certificate of Occupancy, all structural BMPs included in the approved FINAL WQMP shall be inspected for completion of installation in accordance with approved plans and specifications, and the FINAL WQMP. The Public Works Stormwater Inspection team shall verify that all proposed structural BMPs are in working conditions, and that a hard copy and / or digital copy of the approved FINAL WQMP are available at the site for use and reference by future owners/occupants. The inspection shall ensure that the FINAL WQMP at the site includes the BMP Operation and Maintenance Plan, and shall include the site in a City maintained database for future periodic inspection. 102. WQMP/BMP Education - Prior to issuance of Certificate of Occupancy, the developer / project owner shall provide the City proof of notification to future occupants of all BMP’s and educational and training requirements for said BMP’s as directed in the approved WQMP. Proof of notification shall be provided to the Public Works / Engineering Department in forms determined acceptable by the Public Works Director / City Engineer. Public Education Program materials may be obtained from the Riverside County Flood Control and Water Conservation District’s NPDES Section through their website at www.rcwatershed.org. The developer must provide to the Public Works / Engineering Department a notarized affidavit, or other notification forms acceptable to the Public Works Director / City Engineer, stating that the distribution of educational materials to future homebuyers has been completed prior to issuance of occupancy permits.

A copy of the notarized affidavit must be placed in the final WQMP report. The Public Works / Engineering Department MUST also receive the original notarized affidavit with the plan check submittal to clear the appropriate condition. Placing a copy of the affidavit without submitting the original will not guarantee clearance of the condition. 103. EMWD Minimum Standards – All public water, sewer and recycled water improvements shall be designed per the City adopted Riverside County Ordinances 460, 461 and 787; Eastern Municipal Water Districts (EMWD) standards and specifications, including required auxiliaries and appurtenances. The final design, including pipe sizes and alignments, shall be subject to the approval of EMWD and the City of Menifee.
104. Utility Improvement Plans – Public Water, Sewer and Recycled Water improvements shall be drawn on City title block for review and approval by the Public Works / Engineering Department and EMWD.
105. Onsite and Offsite Sewer, Water and Recycled Water Improvements – All public onsite and offsite sewer, water and recycled water improvements shall be guaranteed for construction prior to approval of improvement plans and final map approval. 106. Sewer Lines – Any new public sewer line alignments or realignments shall be designed such that the manholes are aligned with the center of lanes or on the lane line and in

Page 48 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 300

Menifee Mayor and City Council
December 3, 2025
Page
892 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 301

Menifee Mayor and City Council
December 3, 2025
Page
893 of 966

accordance with Riverside County Ordinances 460/461 and Eastern Municipal Water District standards.
107. Water Mains and Hydrants - All water mains and fire hydrants providing required fire flows shall be constructed in accordance with the Riverside County Ordinance Numbers 460 and 787, and subject to the approval of the Eastern Municipal Water District and the Riverside County Fire Department.
108. Annexation to the Citywide Community Facilities District (CFD) - Prior to map recordation, the developer/property owner shall complete the annexation of the proposed development, into the boundaries of the City of Menifee citywide Community Facilities Maintenance District (Services) CFD. The citywide CFD shall be responsible for:

The maintenance of public improvements or facilities that benefit this development, including but not limited to, public landscaping, streetlights, traffic signals, streets, pavement maintenance, drainage facilities, street sweeping, water quality basins, graffiti abatement, and other public improvements or facilities as approved by the Public Works Director.

The developer/property owner shall be responsible for all cost associated with the annexation of the proposed development in the citywide CFD. 109. CFD Annexation Agreement - In the event timing for this development’s schedule prevents the developer/property owner from complying with condition of approval for CFD annexation, the developer shall enter into a CFD annexation agreement to allow the annexation to complete before the issuance of a building permit. The developer shall be responsible for all costs associated with the preparation of the CFD annexation agreement. The agreement shall be approved by the City Council prior to issuance of a building permit.
110. Assessment Segregation - Should this project lie within any assessment/benefit district, the applicant shall, prior to any building permit issuance to make application for and pay for their reapportionment of the assessments or pay the unit fees in the benefit district unless said fees are deferred to building permit. 111. Landscape Improvement Plans for CFD Maintenance – Landscape improvements within public ROW and/or areas dedicated to the City for the citywide CFD to maintain shall be prepared on a separate City CFD plans for review and approval by the PW Engineering Department. The plans may be prepared as one plan for the entire development as determined by the PW Director. When necessary, as determined by the PW Director, a separate WQMP construction plan on City title block maybe required for review and approval by the PW Engineering Department prior to issuance of a grading permit.
112. Parkway Landscaping Design Standards - The parkway areas behind the street curb within the public’s right-of-way, shall be landscaped and irrigated per City standards and guidelines.
113. CFD Landscape Guidelines and Improvement Plans – All landscape improvements for maintenance by the CFD shall be designed and installed in accordance with City

Page 49 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 302

Menifee Mayor and City Council
December 3, 2025
Page
894 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 303

Menifee Mayor and City Council
December 3, 2025
Page
895 of 966

CFD Landscape Guidelines, and shall be drawn on a separate improvement plan on City title block. The landscape improvement plans shall be reviewed and approved by the PW Engineering Department prior to issuance of a building permit. 114. Maintenance of CFD Accepted Facilities – All landscaping and appurtenant facilities to be maintained by the citywide CFD shall be built to City standards. The developer shall be responsible for ensuring that landscaping areas to be maintained by the CFD have its own controller and meter system, separate from any private controller/meter system.
115. AB 341. AB 341 focuses on increased commercial waste recycling as a method to reduce greenhouse gas (GHG) emissions. The regulation requires businesses and organizations that generate four or more cubic yards of waste per week and multifamily units of 5 or more, to recycle. A business shall take at least one of the following actions to reuse, recycle, compost, or otherwise divert commercial solid waste from disposal:
a. Source separate recyclable and/or compostable material from solid waste and donate or self-haul the material to recycling facilities. b. Subscribe to a recycling service with their waste hauler. c. Provide recycling service to their tenants (if commercial or multi-family complex).
d. Demonstrate compliance with the requirements of California Code of Regulations Title 14.

For more information please visit:
www.rivcowm.org/opencms/recyclying/recycling_and_compost_business.html#manda tory
116. AB 1826. AB 1826 (effective April 1, 2016) requires businesses that generate eight (8) cubic yards or more or organic waste per week to arrange for organic waste recycling services. The threshold amount of organic waste generated requiring compliance by businesses is reduced in subsequent years. Businesses subject to AB 1826 shall take at least one of the following actions in order to divert organic waste from disposal:

Source separate organic material from all other recyclables and donate or self-haul to a permitted organic waste processing facility.

Enter into a contract or work agreement with gardening or landscaping service provider or refuse hauler to ensure the waste generated from those services meet the requirements of AB 1826.

Consider xeriscaping and using drought tolerant/low maintenance vegetation in all landscaped areas of the project.

As of January 1, 2019, the above requirements are now applicable to businesses that generate four (4) or more cubic yards of solid waste per week and one (1) or more cubic yards of organic waste per week. Additionally, as of January 1, 2019, a third trash bin is now required for organics recycling, which will require a larger trash enclosure to accommodate three (3) trash bins. This development is not subject to this requirement.

Page 50 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 304

Menifee Mayor and City Council
December 3, 2025
Page
896 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 305

Menifee Mayor and City Council
December 3, 2025
Page
897 of 966

117. Recyclables Collection and Loading Area Plot Plan. Prior to the issuance of a building permit for each building, the applicant shall submit three (3) copies of a Recyclables Collection and Loading Area plot plan to the City of Menifee Engineering/Public Works Department for review and approval. The plot plan shall show the location of and access to the collection area for recyclable materials, along with its dimensions and construction detail, including elevation/façade, construction materials and signage. The plot plan shall clearly indicate how the trash and recycling enclosures shall be accessed by the hauler.

The applicant shall provide documentation to the Community Development Department to verify that Engineering and Public Works has approved the plan prior to issuance of a building permit.
118. Waste Recycling Plan. Prior to the issuance of a building permit for each building, a Waste Recycling Plan (WRP shall be submitted to the City of Menifee Engineering/Public Works Department for approval. Completion of Form B “Waste Reporting Form” of the Construction and Demolition Waste Diversion Program may be sufficient proof of WRP compliance, as determined by the Public Works Director / City Engineer. At minimum, the WRP must identify the materials (i.e., concrete, asphalt, wood, etc.) that will be generated by construction and development, the projected amounts, the measures/methods that will be taken to recycle, reuse, and/or reduce the amounts of materials, the facilities and/or haulers that will be utilized, and the targeted recycling or reduction rate. During project construction, the project site shall have, at a minimum, two (2) bins; one for waste disposal and the other for recycling of Construction and Demolition (C&D) materials. Additional bins are encouraged to be used to further source separation of C&D recyclable materials.

Accurate record keeping (receipts) for recycling of C&D recyclable materials and solid waste disposal must be kept. Arrangements can be made through the franchise hauler. 119. Waste Management Clearance. Prior to issuance of an occupancy permit for each building, evidence (i.e., receipts or other type of verification) shall be submitted to demonstrate project compliance with the approved WRP to the Engineering and Public Works Department in order to clear the project for occupancy permits. Receipts must clearly identify the amount of waste disposed and Construction and Demolition (C&D) materials recycled. Completion of Form C, “Waste Reporting Form” of the Construction and Demolition Waste Diversion Program along with the receipts may be sufficient proof of WRP compliance, as determined by the PW Director / City Engineer. 120. Road Bridge Benefit District –The applicant shall pay the RBBD fees based on the designated land use and areas, prior to the issuance of a building permit. Should the project proponent choose to defer the time of payment, a written request shall be submitted to the City, deferring said payment from the time of issuance of a building permit to issuance of a certificate of occupancy. Fees which are deferred shall be based upon the fee schedule in effect at the time of issuance of the permit of each parcel. 121. TUMF FEES - Prior to the issuance of an occupancy permit, the developer/property owner shall pay the Transportation Uniform Mitigation Fee (TUMF) in accordance with the fee schedule in effect at the time of (building permit or certificate of occupancy) issuance, pursuant to adopted City Ordinance governing the TUMF program.

Page 51 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 306

Menifee Mayor and City Council
December 3, 2025
Page
898 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 307

Menifee Mayor and City Council
December 3, 2025
Page
899 of 966

122.Fees and Deposits – Prior to approval of final maps, grading plans, improvement plans, issuance of building permits, and/or issuance of certificate of occupancy, the developer/property owner shall pay all fees, deposits as applicable. These shall include the regional Transportation Uniform Mitigation Fee (TUMF), any applicable Traffic Signal Mitigation Fees, Development Impact Fees (DIF), and any applicable Road and Bridge Benefit District (RBBD) Fee. Said fees and deposits shall be collected at the rate in effect at the time of collection as specified in current City resolutions and ordinances.

Page 52 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 308

Menifee Mayor and City Council
December 3, 2025
Page
900 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 309

Menifee Mayor and City Council
December 3, 2025
Page
901 of 966

Section III:

Building and Safety Department
Conditions of Approval

Page 53 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 310

Menifee Mayor and City Council
December 3, 2025
Page
902 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 311

Menifee Mayor and City Council
December 3, 2025
Page
903 of 966

GENERAL CONDITIONS

1. Final Building & Safety Conditions. Final Building & Safety Conditions will be addressed when building construction plans are submitted to Building & Safety for review. These conditions will be based on occupancy, use, the California Building Code (CBC), and related codes which are enforced at the time of building plan submittal.

2. Compliance with Code. All Design components shall comply with applicable provisions of the 2022 edition of the California Building, Plumbing and Mechanical Codes; 2022 California Electrical Code; California Administrative Code, 2022 California Energy Codes, 2022 California Green Building Standards, California Title 24 Disabled Access Regulations, and City of Menifee Municipal Code. If a code cycle changes prior to submission of any plans or documents, the plans submitted shall be updated to the current State of California, Title 24, Code of Regulations, City of Menifee Ordinance, or any other state, federal, or city requirements.

3. Photovoltaic System. A photovoltaic (PV) system shall be installed on the newly constructed dwelling units per State of California Assembly Bill 178 (AB-178). The PV plans may be deferred. The proposed location of the PV system shall be shown on the first submittal of the dwelling construction plans for review. Any deferred PV system plans shall be submitted and approved prior to the rough electrical inspection of each unit.

4. County of Riverside Mount Palomar Ordinance. Applicant shall submit, at the time of plan review, a complete exterior site lighting plan with a “photometric study” showing compliance with County of Riverside Mount Palomar Ordinance Number 655 for the regulation of light pollution. All streetlights and other outdoor lighting shall be shown on electrical plans submitted to the Building & Safety Department. Any outside lighting shall be hooded and aimed not to shine directly upon adjoining property or public rights-of- way. All exterior LED light fixtures shall be 3,000 kelvin and below.

5. Street Name Addressing. Applicant must obtain street name addressing for all proposed buildings by requesting street name addressing and submitting a site plan for commercial, residential/tract, or multi-family residential projects.

6. Obtain Approvals Prior to Construction. Applicant must obtain all building plans and permit approvals prior to commencement of any construction work.

7. Obtaining Separate Approvals and Permits. The recreation center, pools, and other associated structures and amenities for the recreation center shall be permitted separately. Temporary construction/sales trailers, temporary power poles/generators, trash enclosures, patio covers, light standards, building and monument signage, and any block walls will require separate approvals and permits. All parks that are a part of the development shall be permitted separately.

8. Private Sanitary Sewer and Domestic Water Plan Approvals. (If Applicable) On-site private sanitary sewer and domestic water plans will require separate approvals and permits from Building and Safety. One (1) set of digital or six (6) sets of plans shall be submitted.

Page 54 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 312

Menifee Mayor and City Council
December 3, 2025
Page
904 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 313

Menifee Mayor and City Council
December 3, 2025
Page
905 of 966

9. Demolition. (If applicable) Demolition permits require separate approvals and permits.

AQMD notification and approval may be required.

10. Hours of Construction. Signage shall be prominently posted at the entrance of the project indicating the hours or construction, as allowed by the City of Menifee Municipal Ordinance 8.01.010, for any site within one-quarter mile of an occupied residence. The permitted hours of construction are Monday through Saturday 7:00am to 7:00pm. No work is permitted on Sundays and nationally recognized holidays unless approval is obtained from the City Building Official or City Engineer.

Provide a tract production application and sequence worksheet with the following information:

1. Identify the applicant, developer/builder, tract, phase, and lot number(s) on the City’s application form.

2. On a sequence worksheet, identify the addresses, assessor’s parcel numbers, lot numbers, plan types, elevations, habitable square foot area, garage square foot area, patio/deck square footage and chosen options.

3. Clearly identify all options creating additional square feet, or changes to total square foot area

4. Identification of residential lots based on percentages required by the Community Development Department.

Submit one (1) set of digital plans including but not limited to, fully dimensioned Structural, Architectural, Plumbing, Mechanical and Electrical Plans, floor, and site plans and, geotechnical reports. All digital plans shall be a minimum equivalent of 24” x 36” size media.

Site Plans

1. Vicinity Map.

2. Assessor’s Parcel Number, Tract and Lot number; and Site Address.

3. Building data: Proposed building Sq. Ft., use/occupancy, Building Code data: The California Model Codes currently in effect are the 2022 California Code of Regulations, Title 24 – Building, Electrical, Mechanical, Plumbing, Green Building Code, Fire, and California Energy Code.

Floor Plans

1. North Arrow.

2. Street frontage, lot lines and lot dimensions.

3. Building location and setbacks to property lines and/or easements.

Floor Plans

1. Each model or building type.

2. Universal Design components for single- family residential dwellings.

Elevations

Page 55 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 314

Menifee Mayor and City Council
December 3, 2025
Page
906 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 315

Menifee Mayor and City Council
December 3, 2025
Page
907 of 966

All model or building types. Provide North, South, East, and West side views of the building exterior, showing the structure’s exterior features and elements e.g., exterior wall finish, wall veneers, fireplace chimney, roof pitch, roof vents, doors, windows, etc.

Plumbing/Mechanical

1. Points of connection for water/sewer meter locations.

2. Material type and sizes for waste/vent, water, and gas supply systems.

3. HVAC equipment location; gas stub locations and BTU input for gas appliances.

4. County of Riverside Environmental Health Department Approved septic system design.

Electrical Plan

1. Electrical main service size, location, and grounding method.

2. Electrical power and lighting plans, lighting fixture schedule.

3. Title 24 Energy Code electrical requirements including high efficacy fixture types, motion sensors, dimmer switching or photo controls.

4. In single-family residential buildings that include one or two dwellings, each dwelling unit shall be provided with dedicated raceways, designated branch circuits and isolation devices for energy storage systems as specified in California Energy Code Section 150.0(s). Additionally, the panelboards shall be provided with the minimum busbar rating as specified in California Energy Code Section 150.0(s).

Alternatively, an energy storage systems (ESS) shall be installed with minimal backup capacity and ESS supplied branch circuits as specified in California Energy Code Section 150.0(s).

Structural Plan/Foundation/Framing/Roof Plan and Details

1. Structural design by a State of California registered engineer or licensed architect if the proposed structure does not comply with conventional light wood framing.

2. Foundation elements to include, footing & slab reinforcement; footing and slab details, including base.
preparation, sand layer(s), moisture barrier; anchor bolt size and spacing, hold down devices, etc.

3. Structural frame plan(s) and key referenced details for walls, floor levels and roof.

4. One (set) set of stamped/signed (digital signature accepted) Structural Calculations.

One (1) digital set of stamped/signed (digital signature accepted) Roof Truss Calculations (if applicable). The architect or engineer of record shall first review and stamp the truss layout sheet, indicating the design to be in general conformance with the building design, prior to submittal to the Building and Safety Department for review and approval.

Page 56 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 316

Menifee Mayor and City Council
December 3, 2025
Page
908 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 317

Menifee Mayor and City Council
December 3, 2025
Page
909 of 966

Supplemental Information

1. One (1) digital copy of current Geotechnical soils reports, dated within 1 year of plan submittal or, an older report with an update letter addressing current soils data from the same engineering firm.

2. Package D prescriptive method Energy Forms, or computerized ENV (Envelope), MECH (Mechanical) and Mandatory Measures energy calculation forms for new conditioned space; and all the required compliance forms are to be copied to the full-size plan sheets.

3. Include full plan size copies of the city department’s Conditions of Approval to the plans.

4. One (1) digital copy of the approved signed precise grading plan.

5. Fees are based on the current City of Menifee Adopted Fee Schedule.

6. The contractor must sign the permit application and provide evidence of current CA State contractor’s license. All contractor’s/sub-contractors must show proof of State and City licenses and shall comply with Sec. 3800 of the Labor Code regarding Workers Compensation.

7. Applicant shall obtain all required clearances and/or approvals from the appropriate water district(s) and Riverside County Fire prior to issuance of any building permits.

Prior to Issuance of Building Permits

11. Prior to the model home complex, sales office, and production permits, all maps shall be recorded with the City of Menifee. With Building Official and Community Development Director approval, the model home complex and sales office may be constructed prior to final map recordation, subject to a Prior to Final Map Recordation Agreement and Bond.

12. All associated Building Fees to be paid.

13. Each Department is required to sign the City of Menifee request for residential permit issuance form available on the City of Menifee website. The Building and Safety Department shall be the last to sign the form.

Inspections
All inspection requests shall be requested through the City of Menifee Accella Citizen Access (ACA) portal only.
All work that has been requested to be inspected shall be ready for inspection prior to 8:00am.
The approved plans and documents shall be on-site at the time of inspection. Access to the job site shall be provided on the day of inspection by 8:00am. Any construction changes from the approved plans shall be revised on the plans and submitted to the Building and Safety Department for review and approval prior to the inspection.
Any special inspection or deputy reports required by code, or the approved plans shall be provided at the time of inspection for the specific portion of work required the special inspection or deputy report.

Page 57 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 318

Menifee Mayor and City Council
December 3, 2025
Page
910 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 319

Menifee Mayor and City Council
December 3, 2025
Page
911 of 966

Prior to Final Inspection
Each department that has conditions shall have completed and approved their final inspection prior to requesting the final inspection by the Building and Safety Department.

Each Department is required to sign the City of Menifee request for residential occupancy form available on the City of Menifee website. The Building and Safety Department shall be the last to sign the form.

Page 58 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 320

Menifee Mayor and City Council
December 3, 2025
Page
912 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 321

Menifee Mayor and City Council
December 3, 2025
Page
913 of 966

Section IV:

Riverside County Fire Department
Conditions of Approval

Page 59 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 322

Menifee Mayor and City Council
December 3, 2025
Page
914 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 323

Menifee Mayor and City Council
December 3, 2025
Page
915 of 966

1. Life Safety Conditions. Final fire and life safety conditions will be addressed when building plans are reviewed by the Riverside County Fire Department. These conditions will be based on occupancy, use, the California Building Code (CBC), California Fire Code (CFC) and the related codes which are in force at the time of building plan submittal.

2. Fire Department Access. Fire apparatus access roads shall extend to within 150 feet of all portions of the facility and all portions of the exterior walls of the first story of the building as measured by an approved route around the exterior of the building or facility.

3. Fire Flow. Minimum fire flow for the construction of all commercial buildings or residential buildings is required per CFC Appendix B and table B105.1. Prior to building permit issuance, the applicant/developer shall provide documentation to show there exists a water system capable of delivering the fire flow based on the information given. Subsequent design changes may increase or decrease the required fire flow.

4. Fire Hydrants. The minimum number of fire hydrants required, as well as the location and spacing of the fire hydrants, shall comply with the CFC and NFPA 24.

5. Fire Department Access. Fire apparatus access roads shall have an unobstructed width of not less than 24 feet and a vertical clearance of not less than 13 feet 6 inches.

6. Surface Load and Capabilities. Fire apparatus access roads shall be designed to support the impose loads of fire apparatus [80,000 pound live load (gross vehicular weight) distributed over two axles] and shall be surfaced so as to provide all-weather driving capabilities [rear wheel drive apparatus] for the length and grade(s) of the fire apparatus access road.

7. Fire Apparatus Access Road Grade. The grade for access roads shall not exceed 14% (8 degrees). Cross-slope shall not be greater than 2.5% (1.43 degrees) for paved access roads.

8. Parking Restrictions/Obstructions. No parking or other obstruction are permitted on roads that are narrower than 32 feet in width. Parking on one side is permitted on a road that is at least 32 feet but less than 40 feet in width. Parking on two sides is permitted on a road 40 feet or more in width. Trash bins can’t be located in the 24-foot fire lane.

9. Turning Template. The minimum required turning radius of a fire apparatus access road is 45 feet outside radius and 24 feet inside radius.

10. Sprinkler System - Commercial. Commercial buildings or structures 3600 sq. ft. and greater are required to have approved CFC and NFPA 13 compliant fire sprinkler system installed.

11. Sprinkler System - Residential. All new one- and two-family dwellings are required to have approved CFC and NFPA 13D compliant fire sprinkler system installed.

12. Required Submittals (Fire Sprinkler Systems). Fire sprinkler plans shall be submitted to the Riverside County Fire Department for approval. Fire sprinkler plans must be submitted by the installing C-16 contractor to the Riverside County Fire

Page 60 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 324

Menifee Mayor and City Council
December 3, 2025
Page
916 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 325

Menifee Mayor and City Council
December 3, 2025
Page
917 of 966

Department. If plans are done by a licensed Fire Protection Engineer, then the installing (C-16) contractor will be added to the permit prior to installation of the sprinkler system.

Single family tract home developments will be required to submit a set of sprinkler plans and calcs for each individual single-family home, duplex or multi-family complex building.

Each structure will have their own set of plans and calculations.

13. Automatic/Manual Fire Alarm System. Install a manual and/or automatic fire alarm system as required by the California Building Code, California Fire Code and designed in accordance with adopted standards.

14. Additional Required Hydrants. Where new water mains are extended along streets where hydrants are not needed for protection of structures or similar fire problems, fire hydrants shall be provided at spacing not to exceed 1,000 feet to provide for transportation hazards.

15. Fire Hydrants. The Riverside County Fire Department is required to set minimum fire hydrant distances per CFC Appendix C. Standard fire hydrants (6" x 4" 2 1/4" outlets) and or Super Fire Hydrants (6" x 4" x 2 1/4" x 2 1/4" outlets) shall be located on Fire Department access roads and adjacent public streets.

16. Blue Dot Reflectors. Blue retro-reflective pavement markers shall be mounted on private streets, public streets and driveways to indicate location of fire hydrants. Prior to installation, placement of markers must be approved by the Riverside County Fire Department.

17. Two Point Access. This development shall maintain two points of access, via all- weather surface roads, as approved by the Riverside County Fire Department.

18. Access During Construction. Fire Department access road for emergency response during construction shall comply with CFC Chapter 33 and provisions listed in Guideline OFM-01A.

19. Required Submittals (Fire Underground Water). The developer shall furnish a copy of the water system plans to the Riverside County Fire Department for approval prior to installation for all private water systems pertaining to the fire service loop. Plans shall include a current contractor’s C16, C-34, and/or General Class A license and signature.

Hydraulic calculations will be required with the underground submittal to ensure fire flow requirements are being met for the on-site hydrants whether they are public hydrants or private hydrants. The plans must be submitted and approved prior to building permits being issued.

20. Display Building Address. Display Street numbers in a prominent location on the address side of building(s) and rear access if applicable. Numbers and letters shall be a minimum of 12” in height for building(s) up to 25’ in height and 24” in height for building(s) exceeding 25’ in height. All addressing must be legible, of a contrasting color with the background and adequately illuminated to be visible from the street at all hours.

All lettering shall be to Architectural Standards.

21. Fire Lanes. Applicant/developer shall prepare a site plan designating required fire lanes with appropriate lane paintings and/or signs.

Page 61 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 326

Menifee Mayor and City Council
December 3, 2025
Page
918 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 327

Menifee Mayor and City Council
December 3, 2025
Page
919 of 966

22. Construction Phasing. If construction is phased, each phase shall provide approved access and fire protection prior to any building construction. This will include all internal roads, connecting roads between phases and construction gates. All required access must be in and available prior to and during all construction. Phasing is approved on a separate map and is ultimately subject to final approval in the field.

Page 62 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 328

Menifee Mayor and City Council
December 3, 2025
Page
920 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 329

Menifee Mayor and City Council
December 3, 2025
Page
921 of 966

Section V:

Riverside County Department of
Environmental Health

Page 63 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 330

Menifee Mayor and City Council
December 3, 2025
Page
922 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 331

Menifee Mayor and City Council
December 3, 2025
Page
923 of 966

COUNTY OF RIVERSIDE

DEPARTMENT OF ENVIRONMENTAL HEALTH
(888) 722-4234 • RIVCOEH.ORG
March 27, 2025
City of Menifee
Planning Department
Attn: Russell Brown
29844 Haun Road
Menifee, CA 92586
SUBJECT: CITY OF MENIFEE PLANNING APPLICATION - PLN24-0230 TTM39115 (SUBDIVISION 190 SINGLE-FAMILY RESIDENTIAL LOTS)
APNs 329-110-024, 329-110-028, 329-110-041, 329-110-042, 329-110-043 Dear Mr. Brown:

Tentative Tract Map No. PLN24-0230 (TIM 39115) proposes a subdivision of 27.35 gross acres into 190 single-family residential lots. The project proposes two (2) open space amenity areas: an approx. 17,640 square foot recreation center with pool and an approx. 11,000 square foot tot lot, as well as two (2) open space basin areas (41,358 square feet and 93,842 square feet). The site is generally located north of HWY 74, west of Palomar Road, east of Antelope Road and south of Watson Road.

In accordance with the agreement between the Count of Riverside, Department of Environmental Health (DEH) and the City of Menifee, DEH offers the following comments:

POTABLE WATER AND SANITARY SEWER SERVICE:

A "General Condition" shall be placed on the project indicating that the subject property is proposing to continue potable water service and sanitary sewer service from Eastern Municipal Water District (EMWD). It is the responsibility of this facility to ensure that all requirements to obtain potable water and sanitary sewer service are met with EMWD, in addition to all other applicable agencies.

Prior to building permit issuance, provide documentation that establishes water and sewer service for the entire project from EMWD (ex: First Release Letter).

Prior to building permit final, applicant must provide documentation that verifies actual service from EMWD (ex: Final Release Letter).

Office Locations • Corona • Hemet • Indio • Murrieta • Palm Springs • Riverside Phone (888)722-4234
www.rivcoeh.org

Page 64 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 332

Menifee Mayor and City Council
December 3, 2025
Page
924 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 333

Menifee Mayor and City Council
December 3, 2025
Page
925 of 966

RMOVAL/DESTRUCTION OF ANY EXISTING OWTS AND WELLS:

Any existing wells and/or existing onsite wastewater treatment systems (OWTS) shall be properly removed and/or destroyed under permit with DEH. For additional information please contact our Land Use Program at (951) 955-8980.

HAZARDOUS MATERIALS MANAGEMENT BRANCH
Prior to building permit final, this facility shall be required to contact and have a review conducted by the Hazardous Materials Management Branch (HMMB). A business emergency plan for the storage of any hazardous materials, including swimming pool/spa chemicals, greater than 55 gallons, 200 cubic feet or 500 pounds, or any acutely hazardous materials or extremely hazardous substances will be required. If further review of the site indicates additional environmental health issues, HMMB reserves the right to regulate the business in accordance with applicable County Ordinances. Please contact HMMB at (951) 358-5055 to obtain information regarding any additional requirements.

LOCAL ENFORCEMENT AGENCY
Ensure the appropriate size and number of refuse/recycle bins are provided at this site, in accordance with SB1383 and that an approved Solid Waste Hauler purveyor is utilized. For additional information please contact our Local Enforcement Agency (LEA) at (951) 955-8980.

DISTRICT ENVIRONMENTAL SERVICES - FOOD AND POOL PROGRAM If a pool or spa is proposed, prior to issuance of a building permit, the applicant shall be required to contact DEH District Environmental Services to determine the appropriate permitting requirements. For further information, please call (951) 461-0284.

County of Riverside, Department of Environmental Health District Environmental Services - Murricta Office
30135 Technology Dr #250,
Murrieta, CA 92563
For any food facility (i.e. convenience store, restaurants), prior to issuance of Building and Safety permit, the food facility plans will be reviewed by DES to ensure compliance with applicable California Health and Safety Code/California Retail Food Code. An annual operating permit for the food facility will be required.

ENVIRONMENTAL CLEANUP PROGRAMS
As part of the services offered to Contract Cities, the Department of Environmental I-Iealth Environmental Cleanup Programs (ECP) conducts environmental reviews on planning projects to ensure that existing site conditions will not negatively affect human health or the environment.

The objective of the environmental reviews is: to determine if there are potential sources of environmental and/or human exposures associated with the project, identify the significance of potential adverse effects from the contaminants, and evaluate the adequacy of mitigation measures for minimizing exposures and potential adverse effects from existing contamination and/or hazardous substance handling.

PLN24-0230 TTM39115
P a g e 6 5 o f 6 6
Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 334

Menifee Mayor and City Council
December 3, 2025
Page
926 of 966

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 335

Menifee Mayor and City Council
December 3, 2025
Page
927 of 966

The undersigned warrants that he/she is an authorized representative of the project referenced above, that I am specifically authorized to consent to all of the foregoing conditions, and that I so consent as of the date set out below.

Signed Date
Name (please print) Title (please print)

Page 66 of 66 ends

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 336

Menifee Mayor and City Council
December 3, 2025
Page
928 of 966

NOTICE OF PUBLIC HEARING

TIME OF HEARING: 6:00 p.m. or as soon as possible thereafter.

DATE OF HEARING: December 3, 2025
PLACE OF HEARING: MENIFEE CITY COUNCIL CHAMBERS
29844 HAUN ROAD MENIFEE, CA 92586
A PUBLIC HEARING has been scheduled, pursuant to the City of Menifee Municipal Code, before the CITY OF MENIFEE CITY COUNCIL to consider the project shown below:

Project Title:

Appeal (PLN25 -0193) of Menifee 27
Residential Project – TTM No. PLN24 -0230
(TTM 39115) and Plot Plan No. PLN24-0254

Project Location:

The site is generally located north of HWY 74,
south of Watson Road, east of Antelope Road,
along the west side of Palomar Road. The
Project site is inclusive of five parcels identified
by Assessor’s Parcel Numbers (APN) 329-110-
024, -028, -041, -042, and -043.

General Plan Land Use and Zoning:

Menifee North Specific Plan (SP No. 260)
Planning Area 7A and 7B

The City Council will consider the following
project at a public hearing:

On October 22, 2025, the Planning Commission held a duly noticed public hearing and voted unanimously to approve TTM 39115 (PLN24-0230) and Plot Plan No. PLN24-0254 along with the related environmental analysis (Project). On November 3, 2025, the City received an application and fee to appeal the October 22, 2025 Planning Commission decision to the City Council. No additional evidence or analysis was provided.

The Project was approved by the Planning Commission for a 192 single-family residential lot subdivision within Planning Areas 7A and 7B of the Menifee North Specific Plan (SP No. 260). The project utilizes Density Bonus Law (DBL) as 5% of the base density (base density 172 units) or nine (9) units would be restricted to very low - income units; in exchange for providing the very low-income units, the project qualifies for a maximum 20 percent density bonus, and development standard waivers and concessions (or incentives). The project includes two product/lot types: Planning Area 7A consists of 75 lots and Planning Area 7B consists of 117 lots. Unit sizes range from 2,111 square feet to 3,025 square feet. Each lot or unit includes a 2-car garage (min. 400 sq. ft.).

Environmental Information:

The Planning Commission adopted Resolution No. PC25-675 which determined the above Project exempt from the California Environmental Quality Act (CEQA) per Sections 15182 (“ Projects Pursuant to a Specific Plan”) and 15183 (“Projects Consistent with a Community Plan or Zoning”). Following the Project’s approval, a Notice of Exemption (NOE) was filed with the Riverside County Clerk’s Office and State Office of Land Use and Climate Innovation (LCI, formerly OPR) on October 23, 2025. No additional environmental analysis is required to act on the appeal.

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 337

Menifee Mayor and City Council
December 3, 2025
Page
929 of 966

The NOE and 15182/15183 Exemption Checklist, as well as its technical appendices, can be accessed for review on the City website: https://www.cityofmenifee.us/325/Environmental-Notices-Documents.

Any person wishing to comment on the proposed project may do so in writing between the date of this notice and the public hearing and be heard at the time and place noted above. All comments must be received prior to the time of public hearing. All such co mments will be submitted to the City Council, and the City Council will consider such comments, in addition to any oral testimony, before making a decision on the proposed project.

If this project is challenged in court, the issues may be limited to those raised at the public hearing, described in this notice, or in written correspondence delivered to the City Council at, or prior to, the public hearing. Be advised that as a result of public hearings and comment, the City Council may amend, in whole or in part, the proposed project. Accordingly, the designations, development standards, design or improvements, or any properties or lands within the boundaries of the proposed project, ma y be changed in a way other than specifically proposed.

For further information regarding this project, please contact Russell Brown , at (951) 723 -3745 or e -mail [email protected], or go to the City of Menifee’s agenda web page at http://www.cityofmenifee.us. To view the case file for the proposed project contact the Community Development Department office at (951) 672- 6777 Monday through Friday, from 8:00 A.M. to 5:00 P.M. Please send all written correspondence to:

CITY OF MENIFEE COMMUNITY DEVELOPMENT DEPARTMENT
Attn: Russell Brown, Senior Planner
29844 Haun Road
Menifee, CA 92586

Item Title: 11.1
Appeal of the Menifee 27 Project
Item Page Number: 338

Menifee Mayor and City Council
December 3, 2025
Page
930 of 966

CITY OF MENIFEE
SUBJECT: Fire Services Review
MEETING DATE: December 3, 2025
TO: Mayor and City Council
PREPARED BY: Jennifer Jackson, Senior Management Analyst REVIEWED BY: Bryan Jones, Assistant City Manager
APPROVED BY: Armando G. Villa, City Manager
-------------------------------------------------------------------------------------------------------------------------------

RECOMMENDED ACTION

1. Review and discuss the City of Menifee’s fire protection, fire prevention, rescue and emergency medical services provided by Riverside County Fire Department/CAL FIRE through a Cooperative Agreement.

DISCUSSION
In response to a future agenda item request from the City Council on April 2, 2025, a review of the City of Menifee’s fire services was presented for discussion at the September 17, 2025, City Council meeting. The presentation included a review of the Cooperative Agreement between the City of Menifee and the County of Riverside (Cooperative Agreement) for fire protection and fire marshal services including costs, calls for service, City fire infrastructure investments, aid agreements, and assistance given/received under the Cooperative Agreement.

Lastly, staff presented information regarding fire service models and options for consideration including:
Continued discussion with Riverside County/CAL FIRE regarding the disproportionate level of fire services provided by the City of Menifee to neighboring communities and ways to spread contract costs more equitably between jurisdictions; and Consideration of alternatives to contracted fire services:
oMunicipal Fire Department
oFire Protection District
oJoint Powers Authority (JPA)
Citing concerns regarding the disproportionate level of services provided by Menifee to neighboring communities, the Council provided direction to staff to continue discussions with Item Title: 12.1
Fire Services Review
Item Page Number: 1

Menifee Mayor and City Council
December 3, 2025
Page
931 of 966

City of Menifee Staff Report
Fire Services Review
December 3, 2025

Page 2 of 4 ends

3 0
6 4
Riverside County/CAL FIRE in the effort to find a resolution. City staff were asked to provide an update after a period of 60 days. If it is determined that meaningful progress has not been made in addressing the equitable distribution of services between jurisdictions operating under the Cooperative Agreement City Council may seek to complete a feasibility study to evaluate alternative fire service delivery options.

Discussions with Riverside County/CAL FIRE
Following the September 17 City Council meeting, staff engaged in further dialog with the Riverside County/CAL FIRE executive management team. Discussions were held to address the disproportionate level of fire service provided by the City of Menifee as compared to surrounding communities under the existing service model. During these discussions, the leadership teams from both Riverside County and CAL FIRE affirmed their commitment to providing fire protection service equitably across Riverside County Fire Department’s service area.

Riverside County/CAL FIRE executive management issued a letter (Letter) on November 14, 2025, attached for review, in response to the concerns raised by the City Council at the September 17, 2025, meeting. The Letter specifically details the Standards of Coverage and Community Risk Assessment currently underway, offers additional data to provide greater context for the imbalance in Menifee’s fire response within and outside of the City, and provides updates on planned fire system improvements in Perris and Wildomar.

Standards of Coverage and Community Risk Assessment
Set for completion in the second quarter of 2026, the comprehensive Standards of Coverage and Community Risk Assessment, conducted by Citygate Associates, will provide data and recommendations on services, including (but not limited to) the following key areas of concern for the City:
Service delivery analysis (including population and development growth projections) Cost allocation methodologies for the entire County
Current station locations and future station consideration Distribution and deployment of apparatus/vehicles
Community expectations and performance goals
Review of historical system performance
The Assessment also includes stakeholder engagement with input from each city/agency receiving service under the Cooperative Agreement to gain a comprehensive understanding of the communities served and the operational, economic, and policy issues at hand.

Assistance Given/Received - Neighboring Cities
The Letter includes tables which offer additional data to provide context for the disproportionate response levels between Menifee and Perris in Fiscal Year (FY) 2023/24 and FY 2024/25. The first set of comparison tables illustrates a significant rebalancing of mutual aid response volume between the Cities of Perris and Menifee. In FY 2023/24, Menifee's fire department provided service to Perris for 462 more calls than Perris provided to Menifee. This disparity was substantially reduced in FY 2024/25, where Menifee responded to 148 more calls into Perris, a change attributed to the City of Perris purchasing a medic squad.

Item Title: 12.1
Fire Services Review
Item Page Number: 2

Menifee Mayor and City Council
December 3, 2025
Page
932 of 966

City of Menifee Staff Report
Fire Services Review
December 3, 2025

Page 3 of 4 ends

3 0
6 4
A second set of comparison tables indicates the gap in response hours between Menifee and Perris in FY 2023/24 (153.4 additional response hours in Perris) narrowed to 45.6 hours in FY 2024/25.

In addition, the Letter references the progress the City of Perris has made regarding plans for the new South Perris fire station no.105, which will be located at 2495 Murrieta Rd. The City has approved the design and acquired the land for the new station. At the November 18, 2025, Council meeting, the Perris City Council approved the fire station financing plan. At that same meeting, the Perris City Council also approved establishment of a temporary fire station in South Perris at 3012 Sawmill Drive to alleviate the call burden on the Menifee stations until construction of the permanent South Perris station is completed. Lastly, the Letter indicates that discussions with the City of Wildomar staff are ongoing regarding future planning for a station that will serve the east side of the City.

As a next step, there are several options that could be considered:
Option 1: Given continued progress made by the City of Perris’ to establish a new fire station to serve South Perris (relieving pressure on fire stations based in the City of Menifee), the ongoing discussions between Riverside County Fire and the City of Wildomar regarding future fire station planning, and the County’s Standards of Cover and Community Risk Assessment process that is underway, the City Council may want to consider deferring commencement of a feasibility study to evaluate alternative fire service delivery models until the Citygate Assessment is completed (summer of 2026). This study will provide additional information that can be used to inform next steps. Option 2: Alternatively, the City Council may consider concluding the mediation process between the City of Menifee and the City of Perris prior to considering the initiation of a feasibility study to evaluate alternative fire service delivery models. It is anticipated that the mediation process will conclude by February, allowing for a fire services discussion item to be brought back for City Council consideration in early 2026. Option 3: City staff is prepared to initiate a Request for Proposals (RFP) process for a fire services feasibility study at a future date, subject to the City Council’s direction.

STRATEGIC PLAN OBJECTIVE
Safe and Vibrant Community

FISCAL IMPACT
There is no fiscal impact associated with the recommended action. Upon request, City staff will initiate an RFP process bringing forward an agreement for completion of fire services feasibility study including the associated fiscal impact.

ATTACHMENTS

1. Letter from Riverside County and CAL FIRE
Item Title: 12.1
Fire Services Review
Item Page Number: 3

Menifee Mayor and City Council
December 3, 2025
Page
933 of 966

City of Menifee Staff Report
Fire Services Review
December 3, 2025

Page 4 of 4 ends

3 0
6 4

2. County of Riverside and Citygate Associates Standards of Cover and Community Risk Assessment Agreement
Item Title: 12.1
Fire Services Review
Item Page Number: 4

Menifee Mayor and City Council
December 3, 2025
Page
934 of 966

Item Title: 12.1
Fire Services Review
Item Page Number: 5

Menifee Mayor and City Council
December 3, 2025
Page
935 of 966

Item Title: 12.1
Fire Services Review
Item Page Number: 6

Menifee Mayor and City Council
December 3, 2025
Page
936 of 966

Item Title: 12.1
Fire Services Review
Item Page Number: 7

Menifee Mayor and City Council
December 3, 2025
Page
937 of 966

Item Title: 12.1
Fire Services Review
Item Page Number: 8

Menifee Mayor and City Council
December 3, 2025
Page
938 of 966

Docusign Envelope ID: F15A8329-DDDB-405E-B79D-9BE11 DBB6EBC Contract ID #FPARC-91875-001-08/26

PROFESSIONAL SERVICE AGREEMENT
for

STANDARDS OF COVER AND COMMUNITY RISK ASSESSMENT
between

COUNTY OF RIVERSIDE
and

CITYGATE ASSOCIATES, LLC
RFP #FPARC-392 Page 1 of28
Form #116-310 -Dated: 3/21/2019
MAY 2 0 2025
i.:u
Item Title: 12.1
Fire Services Review
Item Page Number: 9

Menifee Mayor and City Council
December 3, 2025
Page
939 of 966

Docusign Envelope ID: F15A8329-DDDB-405E-B79D-9BE11 DBB6EBC Contract ID #FPARC-91875-001-08/26

TABLE OF CONTENTS

SECTION HEADING PAGE NUMBER
I. Description of Services ....................................................................................................................... 3

2. Period of Performance ........................................................................................................................ 3

3. Compensation ..................................................................................................................................... 3

4. Alteration or Changes to the Agreement .......................................................................................... .4

5. Termination ........................................................................................................................................ 5

6. Ownership/Use of Contract Materials and Products ......................................................................... 6

7. Conduct of Contractor ........................................................................................................................ 6

8. Inspection of Service: Quality Control/Assurance ............................................................................ 6

9. Independent Contractor/Employment Eligibility ............................................................................... 7

10. Subcontract for Work or Services ...................................................................................................... 9

11. Disputes ............................................................................................................................................. 9

12. Licensing and Permits ....................................................................................................................... 9

13. Use by Other Political Entities ........................................................................................................... 9

14. Non-Discrimination ........................................................................................................................... 10

15. Records and Documents ................................................................................................................... 1 O

16. Confidentiality ................................................................................................................................... 10

17. Administration/Contract Liaison ........................................................................................................ 11

18. ·Notices ................................................................................................................................................ 11

19. Force Majeure ..................................................................................................................................... 11

20. EDD Reporting Requirements ............................................................................................................ 11

21. Hold Harmless/Indemnification ......................................................................................................... 12

22. Insurance ........................................................................................................................................... 12

23. General .............................................................................................................................................. 15 Exhibit A-Scope of Service ............................................................................................................................. 19 Exhibit B- Project Timeline ............................................................................................................................. 25 Exhibit C- Payment Provisions ....................................................................................................................... 26 RFP #FPARC-392 Page 2 of28
Form #116-310 -Dated: 3/21/2019
Item Title: 12.1
Fire Services Review
Item Page Number: 10

Menifee Mayor and City Council
December 3, 2025
Page
940 of 966

Docusign Envelope ID: F15A8329-DDDB-405E-879D-98E11 D886EBC Contract ID #FPARC-91875-001-08/26
This Professional Service Agreement (herein referred to as "Agreement") is made and entered into this pt day of June 2025, by and between CITYGATE ASSOCIATES, LLC, a California limited liability company (herein referred to as "CONTRACTOR"), and the COUNTY OF RIVERSIDE, a political subdivision of the State of California, on behalf of its Fire Department (herein referred to as "COUNTY").

The parties agree as follows:

1. Description of Services

1.1 CONTRACTOR shall provide all services as outlined and specified in Exhibit A, Scope of Services, with the project timelines set forth in Exhibit B, Project Timelines, and at the prices stated in Exhibit C, Payment Provisions.

1.2 CONTRACTOR represents that it has the skills, experience, and knowledge necessary to perfonn under this Agreement and the COUNTY relies upon this representation. CONTRACTOR shall perform to the satisfaction of the COUNTY and in conformance to and consistent with the highest standards of firms/professionals in the same discipline in the State of California.

1.3 CONTRACTOR affirms that it is fully apprised of all of the work to be performed under this Agreement; and the CONTRACTOR agrees it can properly perform this work at the prices stated in Exhibit B.

CONTRACTOR is not to perform services or provide products outside of the Agreement.

1.4 Acceptance by the COUNTY of tb.e CONTRACTOR's performance under this Agreement does not operate as a release of CONTRACTOR's responsibility for full compliance with the terms of this Agreement.

2. Period of Performance

2.1 This Agreement shall be effective upon signature of this Agreement by both parties and continues in effect through June 30, 2026, unless terminated earlier. CONTRACTOR shall commence performance upon signature of this Agreement by both parties and shall diligently and continuously perform thereafter. The Riverside County Board of Supervisors is the only authority that may obligate the County for a non-cancelable multi-year agreement.

3. Compensation

3.1 The COUNTY shall pay the CONTRACTOR for services performed, products provided and expenses incurred in accordance with the terms of Exhibit C, Payment Provisions. Maximum payments by COUNTY to CONTRACTOR shall not exceed $399,864.28 including all expenses. The COUNTY is not responsible for any fees or costs incurred above or beyond the contracted amount and shall have no obligation to purchase any specified amount of services or products. Unless otherwise specifically stated in RFP #FPARC-392 Page 3 of28
Form #116-310 -Dated: 3/21/2019
Item Title: 12.1
Fire Services Review
Item Page Number: 11

Menifee Mayor and City Council
December 3, 2025
Page
941 of 966

Docusign Envelope ID: F15A8329-DDDB-405E-B79D-9BE11 DBB6EBC Contract ID #FP ARC-91875-001-08 /26
Exhibit B, COUNTY shall not be responsible for payment of any of CONTRACTOR 's expenses related to this Agreement.

3.2 [INTENTIONALLY OMITTED]

3.3 CONTRACTOR shall be paid only in accordance with an invoice submitted to COUNTY by CONTRACTOR within fifteen (15) days from the last day of each calendar month, and COUNTY shall pay the invoice within thirty (30) working days from the date of receipt of the invoice. Payment shall be made to CONTRACTOR only after services have been rendered or delivery of materials or products, and acceptance has been made by COUNTY. For this Agreement, send original invoices to:

RIVERSIDE COUNTY FIRE
ATTN: ACCOUNTS PAY ABLE, 210 W. SAN JACINTO A VE., PERRIS, CA 92570 Or Invoices may be emailed to: [email protected]
a) Each invoice shall conta in a minimum of the following information: invoice number and date; remittance address; bill-to and ship-to addresses of orderin g department /division ; Agreement number (FP ARC-91875 -001-08/26) ; quantitie s; item descriptions , unit prices , extens ions, sales/use tax if applicable , and an invoice total. b) Invoices shall be rendered monthly in arrears.

3.4 The COUNTY obligatio n for payment of this Agree ment beyond the current fiscal year end is contingent upon and limited by the availability of COUNTY funding from which payment can be made, and invoices shall be rendered "monthl y" in arrears. In the State of California , Government agencies are not allowed to pay excess interest and late charges, per Government Codes, Section 926.10. No legal liability on the part of the COUNTY shall arise for payment beyond June 30 of each calendar year unless funds are made available for such payme nt. In the event that such funds are not forthcoming for any reason , COUNTY shall immediately notify CONTRACTOR in writing; and this Agree ment shall be deem ed terminated, have no further force , and effect.

4. Alteration or Changes to the Agreement

4.1 The Board of Superv isors a nd the COUNTY Purchasing Agent and/or his designee is the only a uthori zed COUNTY represe ntatives who may at any time, by written order, alter this Agreement. If any such alteration causes an increase or decrease in the cost of, or the time required for the performance under this Agreeme nt, an equitable adjustment sha ll be made in the Agreement price or delivery sched ule, or both , and the Agreement shall be modified by written amendme nt accordingly.

RFP #FP ARC-392 Page 4 of28
Form # 116-310 - Dated: 3/21/2019
Item Title: 12.1
Fire Services Review
Item Page Number: 12

Menifee Mayor and City Council
December 3, 2025
Page
942 of 966

Docusign Envelope ID: F15A8329-DDDB-405E-B79D-9BE11 DBB6EBC Contract ID #FPARC-91875-001-08/26

4.2 Any claim by the CONTRACTOR for additional payment related to this Agreement shall be made in writing by the CONTRACTOR within 30 days of when the CONTRACTOR has or should have notice of any actual or claimed change in the work, which results in additional and unanticipated cost to the CONTRACTOR. If the COUNTY Purchasing Agent decides that the facts provide sufficient justification, he may authorize additional payment to the CONTRACTOR pursuant to the claim. Nothing in this section shall excuse the CONTRACTOR from proceeding with perfonnance of the Agreement even if there has been a change.

5. Termination

5.1. COUNTY may terminate this Agreement without cause upon 30 days written notice served upon the CONTRACTOR stating the extent and effective date of termination.

5.2 COUNTY may, upon five (5) days written notice terminate this Agreement for CONTRACTOR's default, if CONTRACTOR refuses or fails to comply with the terms of this Agreement or fails to make progress that may endanger performance and does not immediately cure such failure. In the event of such tennination, the COUNTY may proceed with the work in any manner deemed proper by COUNTY.

5.3 After receipt of the notice of termination, CONTRACTOR shall:
(a) Stop all work under this Agreement on the date specified in the notice of termination; and
(b) Transfer to COUNTY and deliver in the manner as directed by COUNTY any materials, reports or other products, which, if the Agreement had been completed or continued, would have been required to be furnished to COUNTY.

5.4 After termination, COUNTY shall make payment only for CONTRACTOR's perfonnance up to the date of termination in accordance with this Agreement.

5.5 CONTRACTOR's rights under this Agreement shall terminate (except for fees accrued prior to the date of tennination) upon dishonesty or a willful or material breach of this Agreement by CONTRACTOR; or in the event ofCONTRACTOR's unwillingness or inability for any reason whatsoever to perform the terms of this Agreement. In such event, CONTRACTOR shall not be entitled to any further compensation under this Agreement.

5.6 If the Agreement is federally or State funded, CONTRACTOR cannot be debarred from the System for Award Management (SAM). CONTRACTOR must notify the COUNTY immediately of a debannent. Reference: System for Award Management (SAM) at https://www.sam.gov for Central RFP #FPARC-392 Page 5 of28
Form #116-310-Dated: 3/21/2019
Item Title: 12.1
Fire Services Review
Item Page Number: 13

Menifee Mayor and City Council
December 3, 2025
Page
943 of 966

Docusign Envelope ID: F15A8329-DDDB-405E-B79D-9BE11 DBB6EBC Contract ID #FPARC-91875-001-08/26
Contractor Registry (CCR), Federal Agency Registration (Fedreg), Online Representations and Certifications Application, and Excluded Parties List System (EPLS)). Excluded Parties Listing System (EPLS) (http://www.epls.gov) (Executive Order 12549, 7 CFR Part 3017, 45 CFR Part 76, and 44 CFR Part 17). The System for Award Management (SAM) is the Official U.S. Government system that consolidated the capabilities ofCCR/FedReg, ORCA, and EPLS.

5.7 The rights and remedies of COUNTY provided in this section shall not be exclusive and are in addition to any other rights and remedies provided by law or this Agreement.

6. Ownership/Use of Contract Materials and Products
The CONTRACTOR agrees that all materials, reports or products in any form, including electronic, created by CONTRACTOR for which CONTRACTOR has been compensated by COUNTY pursuant to this Agreement shall be the sole property of the COUNTY. The material, reports or products may be used by the COUNTY for any purpose that the COUNTY deems to be appropriate, including, but not limit to, duplication and/or distribution within the COUNTY or to third parties. CONTRACTOR agrees not to release or circulate in whole or part such materials, reports, or products without prior written authorization of the COUNTY.

7. Conduct of Contractor

7.1 The CONTRACTOR covenants that it presently has no interest, including, but not limited to, other projects or contracts, and shall not acquire any such interest, direct or indirect, which would conflict in any manner or degree with CONTRACTOR's performance under this Agreement. The CONTRACTOR further covenants that no person or subcontractor having any such interest shall be employed or retained by CONTRACTOR under this Agreement. The CONTRACTOR agrees to inform the COUNTY of all the CONTRACTOR's interests, if any, which are or may be perceived as incompatible with the COUNTY's interests.

7.2 The CONTRACTOR shall not, under circumstances which could be interpreted as an attempt to influence the recipient in the conduct of his/her duties, accept any gratuity or special favor from individuals or firms with whom the CONTRACTOR is doing business or proposing to do business, in accomplishing the work under this Agreement.

7.3 The CONTRACTOR or its employees shall not offer gifts, gratuity, favors, and entertainment directly or indirectly to COUNTY employees.

8. Inspection of Service; Quality Control/Assurance
RFP #FPARC-392 Page 6 of28
Form #116-310-Dated: 3/21/2019
Item Title: 12.1
Fire Services Review
Item Page Number: 14

Menifee Mayor and City Council
December 3, 2025
Page
944 of 966

Docusign Envelope ID: F15A8329-DDDB-405E-B79D-9BE11 DBB6EBC Contract ID #FPARC-91875-001-08/26

8.1 All performance (which includes services, workmanship, materials, supplies and equipment furnished or utilized in the perform'ance of this Agreement) shall be subject to inspection and test by the COUNTY or other regulatory agencies at all times. The CONTRACTOR shall provide adequate cooperation to any inspector or other COUNTY representative to permit him/her to determine the CONTRACTOR's conformity with the terms of this Agreement. If any services performed or products provided by CONTRACTOR are not in conformance with the terms of this Agreement, the COUNTY shall have the right to require the CONTRACTOR to perform the services or provide the products in conformance with the terms of the Agreement at no additional cost to the COUNTY. When the services to be performed or the products to be provided are of such nature that the difference cannot be corrected; the COUNTY shall have the right to: (I) require the CONTRACTOR immediately to take all necessary steps to ensure future performance in conformity with the terms of the Agreement; and/or (2) reduce the Agreement price to reflect the reduced value of the services performed or products provided. The COUNTY may also terminate this Agreement for default and charge to CONTRACTOR any costs incurred by the COUNTY because of the CONTRACTOR's failure to perform.

8.2 CONTRACTOR shall establish adequate procedures for self-monitoring and quality control and assurance to ensure proper performance under this Agreement; and shall permit a COUNTY representative or other-regulatory official to monitor, assess, or evaluate CONTRACTOR's performance under.this Agreement at any time, upon reason·able notice to the CONTRACTOR.

9. Independent Contractor/Employment Eligibility

9.1 The CONTRACTOR is, for purposes relating to this Agreement, an independent contractor and shall not be deemed an employee of the COUNTY. It is expressly understood and agreed that the CONTRACTOR (including its employees, agents, and subcontractors) shall in no event be entitled to any benefits to which COUNTY employees are entitled, including but not limited to overtime, any retirement benefits, worker's compensation benefits, and injury leave or other leave benefits. There shall be no employer-employee relationship between the parties; and CONTRACTOR shall hold COUNTY harmless from any and all claims that may be made against COUNTY based upon any contention by a third party that an employer-employee relationship exists by reason of this Agreement. It is further understood and agreed by the parties that CONTRACTOR in the perfonnance of this Agreement is subject to the control or direction of COUNTY merely as to the results to be accomplished and not as to the means and methods for accomplishing the results.

RFP #FPARC-392 Page 7 of28
Form #116-310-Dated: 3/21/2019
Item Title: 12.1
Fire Services Review
Item Page Number: 15

Menifee Mayor and City Council
December 3, 2025
Page
945 of 966

Docuslgn Envelope ID: F15A8329-DDDB-405E-B79D-9BE11DBB6EBC Contract ID #FPARC-91875-001-08/26

9.2 CONTRACTOR warrants that it shall make its best effort to fully comply with all federal and state statutes and regulations regarding the employment of aliens and others and to ensure that employees performing work under this Agreement meet the citizenship or alien status requirement set forth in federal statutes and regulations. CONTRACTOR shall obtain, from all employees performing work hereunder, all verification and other documentation of employment eligibility status required by federal or state statutes and regulations including, but not limited to, the Immigration Reform and Control Act of 1986, 8 U.S.C. §1324 et seq., as they currently exist and as they may be hereafter amended. CONTRACTOR shall retain all such documentation for all covered employees, for the period prescribed by the law.

9.3 Ineligible Person shall be any individual or entity who: Is currently excluded, suspended, debarred or otherwise ineligible to participate in the federal health care programs; or has been convicted of a criminal offense related to the provision of health care items or services and has not been reinstated in the federal health care programs after a period of exclusion, suspension, debarment, or ineligibility.

9.4 CONTRACTOR shall screen prospective Covered Individuals prior to hire or engagement.

CONTRACTOR shall not hire or engage any Ineligible Person to provide services directly relative to this Agreement. .CONTRACTOR shall screen all current Covered Individuals within sixty (60) days of execution of this Agreement to ensure that they have not become Ineligible Persons unless CONTRACTOR has performed such screening on same Covered Individuals under a separate agreement with COUNTY within the past six (6) months. Covered Individuals shall be required to disclose to CONTRACTOR immediately any debarment, exclusion or other event that makes the Covered Individual an Ineligible Person. CONTRACTOR shall notify COUNTY within five (5) business days after it becomes aware if a Covered Individual providing services directly relative to this Agreement becomes debarred, excluded or otherwise becomes an Ineligible Person.

9.5 CONTRACTOR acknowledges that Ineligible Persons are precluded from providing federal and state funded health care services by contract with COUNTY in the event that they are currently sanctioned or excluded by a federal or state law enforcement regulatory or licensing agency. If CONTRACTOR becomes aware that a Covered hldividual has become an Ineligible Person, CONTRACTOR shall remove such individual from responsibility for, or involvement with, COUNTY business operations related to this Agreement.

9.6 CONTRACTOR shall notify COUNTY within five (5) business days if a Covered Individual or entity is currently excluded, suspended or debarred, or is identified as such after being sanction screened.

RFP #FP ARC-3 92 Page 8 of28
Fonn #116-310 -Dated: 3/21/2019
Item Title: 12.1
Fire Services Review
Item Page Number: 16

Menifee Mayor and City Council
December 3, 2025
Page
946 of 966

Docuslgn Envelope ID: F15A8329-DDDB-405E-879D-9BE11 DBB6EBC Contract ID #FPARC-91875-001-08/26
Such individual or entity shall be promptly removed from participating in any activity associated with this Agreement.

10. Subcontract for Work or Services
No contract shall be made by the CONTRACTOR with any other party for furnishing any of the work or services under this Agreement without the prior written approval of the COUNTY; but this provision shall not require the approval of contracts of employment between the CONTRACTOR and personnel assigned under this Agreement, or for parties named in the proposal and agreed to under this Agreement.

11. Disputes

11.1 The parties shall attempt to resolve any disputes amicably at the working level. If that is not successful, the dispute shall be referred to the senior management of the parties. Any dispute relating to this Agreement, which is not resolved by the parties, shall be decided by the COUNTY's Purchasing Department's Compliance Contract Officer who shall furnish the decision in writing. The decision of the COUNTY's Compliance Contract Officer shall be final and conclusive unless determined by a court of competent jurisdiction to have been fraudulent, capricious, arbitrary, or so grossly erroneous to imply bad faith. The CONTRACTOR shall proceed diligently with the performance of this Agreement pending the resolution of a dispute.

11.2 Prior to the filing of any legal action related to this Agreement, the parties shall be obligated to attend a mediation session in Riverside County before a neutral third party mediator. A second mediation session shall be required if the first ses"sion is not successful. The parties shall share the cost of the mediations.

12. Licensing and Permits
CONTRACTOR shall comply with all State or other licensing requirements, including but not limited to the provisions of Chapter 9 of Division 3 of the Business and Professions Code. All licensing requirements shall be met at the time proposals are submitted to the COUNTY. CONTRACTOR warrants that it has all necessary permits, approvals, certificates, waivers and exemptions necessary for performance of this Agreement as required by the laws and regulations of the United States, the State of California, the County of Riverside and all other governmental agencies with jurisdiction, and shall maintain these throughout the term of this Agreement.

13. Use By Other Political Entities
RFP #FPARC-392 Page 9 of28
Form #116-310-Dated: 3/21/2019
Item Title: 12.1
Fire Services Review
Item Page Number: 17

Menifee Mayor and City Council
December 3, 2025
Page
947 of 966

Docusign Envelope ID: F15A8329-DDDB-405E-B79D-9BE11 DBB6EBC Contract ID #FPARC-91875-001-08/26
The CONTRACTOR agrees to extend the same pricing, terms, and conditions as stated in this Agreement to each and every political entity, special district, and related non-profit. It is understood that other entities shall make purchases in their own name, make direct payment, and be liable directly to the CONTRACTOR; and COUNTY shall in no way be responsible to CONTRACTOR for other entities' purchases.

14. Non-Discrimination
CONTRACTOR shall not discriminate in the provision of services, allocation of benefits, accommodation in facilities, or employment of personnel on the basis of ethnic group identification, race, religious creed, color, national origin, ancestry, physical handicap, medical condition, marital status or sex in the performance of this Agreement; and, to the extent they shall be found to be applicable hereto, shall comply with the provisions of the California Fair Employment and Housing Act (Gov. Code 12900 et. seq), the Federal Civil Rights Act of 1964 (P.L. 88-352), the Americans with Disabilities Act of 1990 (42 U.S.C. 12101 et seq.) and all other applicable laws or regulations.

15. Records and Documents
CONTRACTOR shall make available, upon written request by any duly authorized Federal, State, or COUNTY agency, a copy of this Agreement and such books, documents and records as are necessary to certify the nature and extent of the CONTRACTOR's costs related to this Agreement. All such books, documents and records shall be maintained by CONTRACTOR for at least five years following termination of this Agreement and be available for audit by the COUNTY. CONTRACTOR shall provide to the COUNTY reports and information related1to this Agreement as requested by COUNTY.

16. Confidentiality

16.1 The CONTRACTOR shall not use for personal gain or make other improper use of privileged or confidential information which is acquired in connection with this Agreement. The term "privileged or confidential information" includes but is not limited to: unpublished or sensitive technological or scientific information; medical, personnel, or security records; anticipated material requirements or pricing/purchasing actions; COUNTY information or data which is not subject to public disclosure; COUNTY operational procedures; and knowledge of selection of contractors, subcontractors or suppliers in advance of official announcement.

16.2 The CONTRACTOR shall protect from unauthorized disclosure names and other identifying information concerning persons receiving services pursuant to this Agreement, except for general statistical information not identifying any person. The CONTRACTOR shall not use such information for any purpose RFP #FPARC-392 Page IO of 28
Form #116-310 -Dated: 3/21/2019
Item Title: 12.1
Fire Services Review
Item Page Number: 18

Menifee Mayor and City Council
December 3, 2025
Page
948 of 966

Docusign Envelope ID: F15A8329-DDDB-405E-B79D-9BE11 DBB6EBC Contract ID #FPARC-91875-001-08/26
other than carrying out the CONTRACTOR's obligations under this Agreement. The CONTRACTOR shall promptly transmit to the COUNTY all third party requests for disclosure of such information. The CONTRACTOR shall not disclose, except as otherwise specifically permitted by this Agreement or authorized in advance in writing by the COUNTY, any such information to anyone other than the COUNTY. For purposes of this paragraph, identity shall include, but not be limited to, name, identifying number, symbol, or other identifying particulars assigned to the individual, such as finger or voice print or a photograph.

17. Administration/Contract Liaison
The COUNTY Purchasing Agent, or designee, shall administer this Agreement on behalf of the COUNTY. The Purchasing Department is to serve as the liaison with CONTRACTOR in connection with this Agreement.

18. Notices
All correspondence and notices required or contemplated by this Agreement shall be delivered to the respective parties at the addresses set forth below and are deemed submitted two days after their deposit in the United States mail, postage prepaid:

19. COUNTY OF RIVERSIDE
County of Riverside Fire
210 W. San Jacinto Ave
Perris, CA 92570
Attn: Purchasing/951-940-6900
Force Maieure

CONTRACTOR
Citygate Associates, LLC
600 Coolidge Drive, Suite 150
Folsom, CA 95630
Attn: Chad Jackson/916-458-5100
If either party is unable to comply with any provision of this Agreement due to causes beyond its reasonable control, and which could not have been reasonably anticipated, such as acts of God, acts of war, civil disorders, or other similar acts, such party shall not be held liable for such failure to comply.

20. EDD Reporting Requirements
In order to comply with child support enforcement requirements of the State of California, the I
COUNTY may be required to submit a Report of Independent Contractor(s) form DE 542 to the Employment Development Department. The CONTRACTOR agrees to furnish the required data and certifications to the COUNTY within IO days of notification of award of Agreement when required by the RFP #FPARC-392 Page 11 of28
Form #116-310 - Dated: 3/21/2019
Item Title: 12.1
Fire Services Review
Item Page Number: 19

Menifee Mayor and City Council
December 3, 2025
Page
949 of 966

Docusign Envelope ID: F15A8329-DDDB-405E-B79D-9BE11 DBB6EBC Contract ID #FPA RC-91875-001-08 /26
EDD. This data will be transm itted to governmental agencies charged with the establis hment and enforcement of child support orders. Failure of the CONTRACTOR to timely subm it the data and/or cert ificates required may result in the contract being awarded to another contractor. In the event a contract has been issued , failure of the CONTRACTOR to comp ly with all federal and state reporting requirements for child support enforcement or to comp ly with all lawfully served Wage and Earnings Assignments Orders and Notices of Assignme nt shall constitute a material breach of Agreement. If CONTRACTOR has any questions concerning this reporting requirement, please call (916) 657-0529. CONTRACTOR shou ld a lso contact its local Employment Tax Custome r Service Office listed in the telephone directory in the State Government section under "Employment Development Departme nt" or access their Internet site at www .edd .ca.gov.

21. Hold Harinless/Indemnification

21.1 CONTRACTOR shall indemnify and hold harmless the County of Riverside, its Agenc ies, Districts, Special Districts and Departments , their respective director s, officers , Board of Supervisors, elected and appointed officials , employees, agents and representatives (individually and collectivel y hereinafter referred to as Indemnitees) from any liability, action , claim or damage whatsoever, based or asserted upon any services of CONTRACTOR , its officers, employees, subcontractors, agents or representatives arising out of or in any way relating to this Agreement, including but not limited to property damage, bodily injury, or death or any other eleme nt of any kind or nature. CONTRACTOR shall defend the lndemnitee s at its sole expense includin g all costs and fees (including, but not limited , to attorney fees, cost of investigat ion, defense and sett lements or awards) in any claim or action based upon such acts, om1ss1ons or services.

21.2 With respect to any action or claim subject to indemnification herein by C ONTRACTOR, CONTRACTOR shall, at their sole cost, have the right to use counse l of their own choice and shall have the right to adjust, sett le, or compromise any such action or claim without the prior consent of COUNTY; provided, however , that any such adjustment , settlement or comprom ise in no manner whatsoever limits or circumscribes CONTRACTOR indemnifi cation to Indemnitees as set forth herein.

21.3 CONTRACTOR ' S obligation hereunder shall be satisfied when CONTRACTOR has provided to COUNTY the appropriate form of dismissal r elieving COUNTY from any liability for the action or claim involved.

RFP #FP ARC-392 Page 12 of28
Form # 116-310 - Dated: 3/21/2019
Item Title: 12.1
Fire Services Review
Item Page Number: 20

Menifee Mayor and City Council
December 3, 2025
Page
950 of 966

Docusign Envelope ID: F15A8329-DDDB-405E-B79D-9BE11 DBB6EBC Contract ID #FPARC-91875-001-08/26

21.4 The specified insurance limits required in this Agreement shall in no way limit or circumscribe CONTRACTOR'S obligations to indemnify and hold harmless the Indemnitees herein from third party claims.

22. Insurance

22.1 Without limiting or diminishing the CONTRACTOR'S obligation to indemnify or hold the COUNTY harmless, CONTRACTOR shall procure and maintain or cause to be maintained, at its sole cost and expense, the following insurance coverage's during the term of this Agreement. As respects to the insurance section only, the COUNTY herein refers to the County of Riverside, its Agencies, Districts, Special Districts, and Departments, their respective directors, officers, Board of Supervisors, employees, elected or appointed officials, agents, or representatives as Additional Insureds.

A. Workers' Compensation:

If the CONTRACTOR has employees as defined by the State of California, the CONTRACTOR shall maintain statutory Workers' Compensation Insurance (Coverage A) as prescribed by the laws of the State of California. Policy shall include Employers' Liability (Coverage B) including Occupational Disease with limits not less than $1,000,000 per person per accident. The policy shall be endorsed to waive subrogation in favor of The County of Riverside.

B. Commercial General Liability:

Commercial General Liability insurance coverage, including but not limited to, premises liability, unmodified contractual liability, products and completed operations liability, personal and advertising injury, and cross liability coverage, covering claims which may arise from or out of CONTRACTOR'S performance of its obligations hereunder. Policy shall name the COUNTY as Additional Insured. Policy's limit of liability shall not be less than $2,000,000 per occurrence combined single limit. If such insurance contains a general aggregate limit, it shall apply separately to this agreement or be no less than two (2) times the occurrence limit.

C. Vehicle Liability:

If vehicles or mobile equipment is used in the performance of the obligations under this Agreement, then CONTRACTOR shall maintain liability insurance for all owned, non-owned, or hired vehicles so used in an amount not less than $1,000,000 per occurrence combined single limit. If such insurance contains a general aggregate limit, it shall apply separately to this agreement or be no less than two (2) times the occurrence limit. Policy shall name the COUNTY as Additional Insureds.

RFP #FPARC-392 Page 13 of28
Form #116-310 -Dated: 3/21/2019
Item Title: 12.1
Fire Services Review
Item Page Number: 21

Menifee Mayor and City Council
December 3, 2025
Page
951 of 966

Docusign Envelope ID: F15A8329-DDDB-405E-879D-9BE11 D886EBC Contract ID #FPARC-91875-001-08/26
D. Professional Liability Contractor shall maintain Professional Liability Insurance providing coverage for the Contractor's performance of work included within this Agreement, with a limit of liability of not less than $1,000,000 per occurrence and $2,000,000 annual aggregate. If Contractor's Professional Liability Insurance is written on a claims made basis rather than an occurrence basis, such insurance shall continue through the term of this Agreement and CONTRACTOR shall purchase at his sole expense either I) an Extended Reporting Endorsement (also, known as Tail Coverage); or 2) Prior Dates Coverage from new insurer with a retroactive date back to the date of, or prior to, the inception of this Agreement; or 3) demonstrate through Certificates of Insurance that CONTRACTOR has Maintained continuous coverage with the same or original insurer. Coverage provided under items; 1), 2), or 3) will continue as long as the law allows.

E. General Insurance Provisions - All lines:

I) Any insurance carrier providing insurance coverage hereunder shall be admitted to the State of California and have an A M BEST rating of not less than A: VIII (A:8) unless such requirements are waived, in writing, by the County Risk Manager. If the County's Risk Manager waives a requirement for a particular insurer such waiver is only valid for that specific insurer and only for one policy term. 2) The CONTRACTOR must declare its insurance self-insured retention for each coverage required herein. If any such self-insured retention exceeds $500,000 per occurrence each such retention shall have the prior written consent of the ~ounty Risk Manager before the commencement of operations under this Agreement. Upon notification of self-insured retention unacceptable to the COUNTY, and at the election of the County's Risk Manager, CONTRACTOR'S carriers shall either; 1) reduce or eliminate such self-insured retention as respects this Agreement with the COUNTY, or 2) procure a bond which guarantees payment of losses and related investigations, claims administration, and defense costs and expenses. 3) CONTRACTOR shall cause CONTRACTOR'S insurance carrier(s) to furnish the County of Riverside with either I) a properly executed original Certificate(s) of Insurance and certified original copies of Endorsements effecting coverage as required herein, and 2) if requested to do so orally or in writing by the County Risk Manager, provide original Certified copies of policies including all Endorsements and all attachments thereto, showing such insurance is in full force and effect. Further, said Certificate(s) and policies of insurance shall contain the covenant of the insurance carrier(s) that thirty (30) days written notice shall be given to the County of Riverside prior to any material modification, cancellation, expiration or reduction in coverage of such insurance. In the event of a material modification, cancellation, expiration, or reduction in coverage, this Agreement shall terminate forthwith, unless the County of Riverside receives, RFP #FPARC-392 Page 14 of28
Form #116-310 -Dated: 3/21/2019
Item Title: 12.1
Fire Services Review
Item Page Number: 22

Menifee Mayor and City Council
December 3, 2025
Page
952 of 966

Docusign Envelope ID: F15A8329-DDDB-405E-B79O-9BE11 DBB6EBC Contract ID #FPARC-91875-001-08/26
prior to such effective date, another properly executed original Certificate of Insurance and original copies of endorsements or certified original policies, including all endorsements and attachments thereto evidencing coverage's set forth herein and the insurance required herein is in full force and effect.

CONTRACTOR shall not commence operations until the COUNTY has been furnished original Certificate (s) of Insurance and certified original copies of endorsements and if requested, certified original policies of insurance including all endorsements and any and all other attachments as required in this Section. An individual authorized by the insurance carrier shall sign the original endorsements for each policy and the Certificate of Insurance.
4) It is understood and agreed to by the parties hereto that the CONTRACTOR'S insurance shall be construed as primary insurance, and the COUNTY'S insurance and/or deductibles and/or self-insured retention's or self-insured programs shall not be construed as contributory. 5) If, during the term of this Agreement or any extension thereof, there is a material change in the scope of services; or, there is a material change in the equipment to be used in the performance of the scope of work; or, the term of this Agreement, including any extensions thereof, exceeds five (5) years; the COUNTY reserves the right to adjust the types of insurance and the monetary limits of liability required under this Agreement, if in the County Risk Manager's reasonable judgment, the amount or type of insurance carried by the CONTRACTOR has become inadequate. 6) CONTRACTOR shall pass down the insurance obligations contained herein to all tiers of subcontractors working under this Agreement.
7) The insurance requirements contained in this Agreement may be met with a program(s) of self­ insurance acceptable to the COUNTY.
8) CONTRACTOR agrees to notify COUNTY of any claim by a third party or any incident or event that may give rise to a claim arising from the performance of this Agreement.

23. General

23.1 CONTRACTOR shall not delegate or assign any interest in this Agreement, whether by operation of law or otherwise, without the prior written consent of COUNTY. Any attempt to delegate or assign any interest herein shall be deemed void and of no force or effect.

23.2 Any waiver by COUNTY of any breach of any one or more of the terms of this Agreement shall not be construed to be a waiver of any subsequent or other breach of the same or of any other term of this Agreement. Failure on the part of COUNTY to require exact, full, and complete compliance with any RFP #FPARC-392 Page 15 of28
Form #116-310 -Dated: 3/21/2019
Item Title: 12.1
Fire Services Review
Item Page Number: 23

Menifee Mayor and City Council
December 3, 2025
Page
953 of 966

Docuslgn Envelope ID: F15A8329-DDDB-405E-B79D-9BE11 DBB6EBC Contract ID #FPARC-91875-001-08/26
terms of this Agreement shall not be construed as in any manner changing the terms or preventing COUNTY from enforcement of the terms of this Agreement.

23.3 ,In the event the CONTRACTOR receives payment under this Agreement, which is later disallowed by COUNTY for nonconformance with the terms of the Agreement, the CONTRACTOR shall promptly refund the disallowed amount to the COUNTY on request; or at its option the COUNTY may offset the amount disallowed from any payment due to the CONTRACTOR.

23.4 CONTRACTOR shall not provide partial delivery or shipment of services or products unless specifically stated in the Agreement.

23.5 CONTRACTOR shall not provide any services or products subject to any chattel mortgage or under a conditional sales contract or other agreement by which an interest is retained by a third party. The CONTRACTOR warrants that it has good title to all materials or products used by CONTRACTOR or provided to COUNTY pursuant to this Agreement, free from all liens, claims, or encumbrances.

23.6 Nothing in this Agreement shall prohibit the COUNTY from acquiring the same type or equivalent equipment, products, materials or services from other sources, when deemed by the COUNTY to be in its best interest. The COUNTY reserves the right to purchase more or less than the quantities specified in this Agreement.

23.7 The COUNTY agrees to cooperate with the CONTRACTOR in the CONTRACTOR's performance under this Agreement, including, if stated in the Agreement, providing the CONTRACTOR with reasonable facilities and timely access to COUNTY data, information, and personnel.

23.8 CONTRACTOR shall comply with all applicable Federal, State and local laws and regulations. CONTRACTOR will comply with all applicable COUNTY policies and procedures. In the event that there is a conflict between the various laws or regulations that may apply, the CONTRACTOR shall comply with the more restrictive law or regulation.

23.9 CONTRACTOR shall comply with all air pollution control, water pollution, safety and health ordinances, statutes, or regulations, which apply to performance under this Agreement.

23.10 CONTRACTOR shall comply with all requirements of the Occupational Safety and Health Administration (OSHA) standards and codes as set forth by the U.S. Department of Labor and the State of California (Cal/OSHA).

RFP #FPARC-392 Page 16 of28
Form #116-310-Dated: 3/21/2019
Item Title: 12.1
Fire Services Review
Item Page Number: 24

Menifee Mayor and City Council
December 3, 2025
Page
954 of 966

Docusign Envelope ID: F15A8329-DDDB-405E-B79D-9BE11 DBB6EBC Contract ID #FPARC-91875-001-08/26

23.11 This Agreement shall be governed by the laws of the State of California. Any legal action related to the performance or interpretation of this Agreement shall be filed only in the Superior Court of the State of California located in Riverside, California, and the parties waive any provision of law providing for a change of venue to another location. In the event any provision in this Agreement is held by a court of competent jurisdiction to be invalid, void, or unenforceable, the remaining provisions will nevertheless continue in full force without being impaired or invalidated in any way.

23.12 This Agreement, including any attachments or exhibits, constitutes the entire Agreement of the parties with respect to its subject matter and supersedes all prior and contemporaneous representations, proposals, discussions and communications, whether oral or in writing. This Agreement may be changed 9r modified only by a written amendment signed by authorized representatives of both parties.

23.13 This Agreement may be executed in any number of counterparts, each of which will be an original, but all of which together will constitute one instrument. Each party of this Agreement agrees to the use of electronic signatures, such as digital signatures that meet the requirements of the California Uniform Electronic Transactions Act (("CUETA") Cal. Civ. Code §§ 1633.1 to 1633.17), for executing this Agreement. The parties further agree that the electronic signatures of the parties included in this Agreement are intended to authenticate this writing and to have the same force and effect as manual signatures. Electronic signature means an electronic sound, symbol, or process attached to or logically associated with an electronic record and executed or adopted by a person with the intent to sign the electronic record pursuant to the CUETA as amended from time to time. The CUETA authorizes use of an electronic signature for transactions and contracts among parties in California, including a government agency. Digital signature means an electronic identifier, created by computer, intended by the party using it to have the same force and effect as the use of a manual signature, and shall be reasonably relied upon by the parties. For purposes of this section, a digital signature is a type of "electronic signature" as defined in subdivision (i) of Section 1633.2 of the Civil Code.

23.14 This Agreement constitutes the entire Agreement and understanding between the parties to this Agreement and supersedes all prior and contemporaneous negotiations and understandings between the parties whether oral or written, expressed or implied.

RFP #FPARC-392 Page 17of28
Form #116-310 -Dated: 3/21/2019
Item Title: 12.1
Fire Services Review
Item Page Number: 25

Menifee Mayor and City Council
December 3, 2025
Page
955 of 966

Docusign Envelope ID: F15A8329-DDDB-405E-B79D-9BE11 DBB6EBC Contract ID #FPARC-91875-00 1-08/26
fN WITNESS WHEREOF, the Parties hereto have caused their duly authorized representatives to exec ute this Agreement.

COUNTY OF RIVERSIDE, a political
subdivision of the State of California
By: t:/0_) /_~
Name: V. Manuel Perez~ '
Title: Chair of the Board of Supervi sors
Dated: MAY 2 0 2025
ATTEST:

Kimberly A. Rector
Clerk of the rd
APPROVED AS TO FORM:

Minh C. Tran
County Counsel
RFP #FPARC-392
Form # I I 6-3 IO - Dated: 3/21/2019

Page 18 ends