A-3
The AGENCY will deduct five percent (5%) retention from all progress payments as specified in Section 9-3.2 of these Specifications. The Contractor may substitute an escrow holder surety of equal value to the retention and the Contractor shall be beneficial owner of the surety and shall receive any interest thereon.

The AGENCY reserves the right to reject any or all bids, to waive any irregularity and to take all bids, under advisement for a period of sixty (60) days.

The contract period for this project is One Hundred Sixty (160) working days from the effective date of the Notice-to-Proceed to be issued by the City.

BY ORDER OF: The City of Montebello, California
_____________________________
Christopher Jimenez, City Clerk

Page 443 of 1292 ends

B-1

INSTRUCTIONS TO BIDDERS
FOR

PAVING THE WAY PROGRAM

MONTEBELLO BLVD
(FROM LOS ANGELES AVE TO LINCOLN BLVD)
C.P. No. 888

IN THE CITY OF MONTEBELLO

PROPOSAL FORMS
Bids shall be submitted electronically and use the Proposal forms provided by the AGENCY. All information requested therein must be clearly and legibly set forth in the manner and form indicated. The AGENCY will not consider any proposal not meeting these requirements.

PROPOSAL GUARANTEE
Proposals must be accompanied by a proposal guarantee consisting of a certified or cashier’s check or bid bond payable to the AGENCY in the amount not less than ten percent of the total amount bid. Any proposal not accompanied by such a guarantee will not be considered. If a bidder to whom a contract is awarded fails or refuses to execute the contract documents or furnish the required insurance policies and bonds as set forth in those documents, the proposal guarantee shall be forfeited to the AGENCY. The proposal guarantees of all bidders will be held until the successful bidder has properly executed all contract documents.

DELIVERY OF PROPOSAL
Electronic Bids shall be submitted electronically at https://www.montebelloca.gov/cms/ one.aspx?portalId=58756&pageId=84839 at 11 am, on April 23, 2025. It is the bidder’s responsibility to ensure the bids have been successfully submitted thru PlanetBids. Bidders can contact the AGENCY’S Purchasing Officials for confirmation. Late proposals will not be considered.

WITHDRAWAL OF PROPOSALS
A proposal may be withdrawn by a written request signed by the bidder. Such requests must be delivered to the AGENCY’s designated official prior to the bid-opening hour stipulated in the Notice Inviting Sealed Bids. Proposals may not be withdrawn after said hour without forfeiture of the proposal guarantee. The withdrawal of the proposal will not prejudice the right of the bidder to submit a new proposal, providing there is time to do so.

IRREGULAR PROPOSALS
Unauthorized conditions, limitations, or provisions attached to a proposal will render it irregular and may cause its rejection. The completed proposal forms shall be without interlineations, alterations, or erasures. Alternative proposals will not be considered unless specifically requested.

Page 444 of 1292 ends

B-2
No oral, telegraphic, telephonic, facsimile or electronic proposal, modification or withdrawal will be considered.

TAXES
No mention shall be made in the proposal of Sales Tax, Use Tax, or any other tax, as all amounts bid will be deemed and held to include any such taxes, which may be applicable.

DISQUALIFICATION OF BIDDERS
In the event that any bidder acting as a prime contractor has an interest in more than one proposal, all such proposals will be rejected, and the bidder will be disqualified. This restriction does not apply to subcontractors or suppliers who may submit quotations to more than one bidder, and while doing so, may also submit a formal proposal as a prime contractor. No proposal will be accepted from a bidder who has not been licensed in accordance with the provisions of the State Business and Professions Code.

DISCREPANCIES AND MISUNDERSTANDINGS
Bidders must satisfy themselves by personal examination of the work site, Plans, Specifications, and other contract documents and by any other means as they may believe necessary, as to the actual physical conditions, requirements and difficulties under which the work must be performed.

No bidder shall at any time after submission of a proposal make any claim or assertion that there was any misunderstanding or lack of information regarding the nature or amount of work necessary for the satisfactory completion of the job. Any errors, omissions, or discrepancies found in the Plans, Specifications, or other contract documents shall be called to the attention of the AGENCY and clarified prior to the submission of proposals.

EQUIVALENT MATERIALS
Although the bidder may believe that by use of a different material than that specified on/in the plans and specifications, a lower cost project/bid may result. The bidder is to bid the project on the basis of using the material(s) as named keeping in mind that all materials named herein by manufacturer is not to prohibit the bidder considering using in his bid what he consider to be an equal material except where the AGENCY has designated a sole product. Once the bids have been opened the successful Contractor may discuss with the AGENCY the use of another product; which may result in a determination by the AGENCY that the other product is equal and possibly that by the AGENCY allowing the use of the Contractor proposed equal that a change in the contract amount may result.

LEGAL RESPONSIBILITIES
All proposals must be submitted, filed, made, and executed in accordance with State and Federal laws relating to bids for contracts of this nature whether the same or expressly referred to herein or not. Any bidder submitting a proposal shall by such action thereby agree to each and all of the terms, conditions, provisions, and requirements set forth, contemplated, and referred to in the Plans, Specifications, and other contract documents, and to full compliance therewith.

Page 445 of 1292 ends

B-3

AWARD OF CONTRACT
The award of contract, if made, will be to the lowest responsible bidder as determined solely by the AGENCY. Additionally, the AGENCY reserves the right to accept or reject any or all proposals, to waive any irregularity, and to make an award as may best serve the interests of the AGENCY.

SURETY BOND PERIOD
Surety Faithful Performance Bond shall be maintained for one (1) year after completion of project construction.

Page 446 of 1292 ends

C-1

PROPOSAL
FOR

PAVING THE WAY PROGRAM

MONTEBELLO BLVD
(FROM LOS ANGELES AVE TO LINCOLN BLVD)
C.P. No. 888

IN THE CITY OF MONTEBELLO
TO THE CITY OF MONTEBELLO, as “AGENCY” or “City”
In accordance with the City’s Notice Inviting Sealed Bids, the undersigned BIDDER hereby proposes to furnish all materials, equipment, tools, labor, and incidentals required for the above stated project as set forth in the Plans, Specifications, and contract documents therefor and to perform all work in the manner and time prescribed therein.

BIDDER declares that this proposal is based upon careful examination of the work site, Plans, Specifications, Instruction to Bidders, and all other contract documents. If this proposal is accepted for award, BIDDER agrees to enter into a contract with City at the unit and/or lump sum prices set forth in the following Bid Schedule. BIDDER understands that failure to enter into a contract in the manner and time prescribed will result in forfeiture to City of the guarantee accompanying this proposal. This bid may not be withdrawn within a period of sixty (60) days after the date of its proper opening by the City.

BIDDER understands that a bid is required for the entire work and that the estimated quantities set forth in the Bid Schedule are solely for the purpose of comparing bids, and that final compensation under the contract will be based upon the actual quantities of work satisfactorily completed. THE

CITY RESERVES THE RIGHT TO INCREASE OR DECREASE THE AMOUNT OF ANY QUANTITY SHOWN AND TO DELETE ANY ITEM FROM THE CONTRACT. It is agreed that the unit and/or lump sum prices bid include all appurtenant expenses, taxes, royalties, and fees. In the case of discrepancies in the amounts bid, unit prices shall govern over extended amounts, and words shall govern over figures.

If awarded the Contract, the undersigned further agrees that in the event of the BIDDER’s default in executing the required contract and filing the necessary bonds and insurance certificates within ten (10) working days after the date of the City’s notice of award of contract to the BIDDER, the proceeds of the security accompanying this bid shall become the property of the City and this bid and the acceptance hereof may, at the City’s option, be considered null and void.

Page 447 of 1292 ends

C-2

BID PROPOSAL
FOR

PAVING THE WAY PROGRAM

MONTEBELLO BLVD
(FROM LOS ANGELES AVE TO LINCOLN BLVD)
C.P. No. 888

IN THE CITY OF MONTEBELLO
The undersigned declares that he has carefully examined the location of the proposed work, that he has examined the specifications and read the accompanying instructions to bidders, and hereby proposes to do all the work in accordance with said specifications for the amounts set forth below:

Construct improvements as reiterated above, located in the City of Montebello, California, in accordance with the specifications for the unit price set forth in the following items:

BASE BID SCHEDULE
ITEM
NO. DESCRIPTION EST QTY UNIT UNITPRICE TOTAL
1 PROJECT INFORMATION SIGNS 2 EA
2 TRAFFIC CONTROL AND STAGE CONSTRUCTION 1 LS
3 PROVIDE CONSTRUCTION SURVEY 1 LS
4 REMOVE TREE AND STUMP 19 EA
5 ROADWAY EXCAVATION 2,000 CY
6 REMOVE EXIST AC PAVEMENT 10,640 SF
7 REMOVE EXIST CONCRETE PAVEMENT 430 SF
8 REMOVE EXIST CONCRETE SIDEWALK 1,930 SF
9 REMOVE EXIST CONCRETE CURB AND MEDIAN
IMPROVEMENTS 1,590 LF
10 REMOVE EXIST CURB RAMP 10 EA
11 REMOVE EXIST DRIVEWAY APPROACH 1 EA
12 REMOVE EXIST CROSS GUTTER 7,720 SF
13 REMOVE AND DISPOSE OF PEDESTRIAN PUSH
BUTTON AND POST 2 EA
14 REMOVE EXIST CURB AND GUTTER 300 LF

Page 448 of 1292 ends

C-3
15 COLD MILL EXIST AC PAVEMENT (2") 307,420 SF
16 CONSTRUCT 2" CONVENTIONAL AC OVERLAY TYPE
C2-PG 64-10 3,715 TON
17 CONSTRUCT AC PAVEMENT 570 TON
18 AGGREGATE BASE 250 CY
19 CONSTRUCT CONCRETE CURB AND GUTTER A2-8 PER
SPPWC STD. PLAN 120-2 220 LF
20 CONSTRUCT 4" PCC SIDEWALK PER SPPWC STD.

PLANS 113-2 1,820 SF
21 CONSTRUCT CONCRETE CROSS GUTTER AND
SPANDREL PER SPPWC STD. PLAN 122-2 7,720 SF
22 CONSTRUCT DRIVEWAY APPROACH PER SPPWC STD.

PLAN 110-2 TYPE A 1 EA
23 CONSTRUCT CONCRETE CURB A1-8 PER SPPWC STD.

PLAN 120-2 5,650 LF
24 CONSTRUCT CONCRETE CURB RAMPS PER SPPWC
STD. PLAN 111-5 (CASE AND TYPE PER PLAN) 10 EA
25 INSTALL DETECTABLE WARNING SURFACE PER
SPPWC STD PLAN 111-5 9 EA
26 ADJUST TO GRADE, WATER VALVE 60 EA
27 ADJUST TO GRADE, STORM DRAIN MANHOLE 20 EA
28 ADJUST TO GRADE, SANITARY SEWER MANHOLE 20 EA
29 FURNISH AND INSTALL TRAFFIC SIGNAL LOOP
DETECTORS AND CONNECT DLC 63 EA
30 INSTALL TRAFFIC STRIPING, SIGNING, DELINEATORS 1 LS
31 INSTALL SERVICE EQUIPMENT ENCLOSURE, TYPE IIIB PER CALTRANS STD PLAN ES-2E 2 LS 32 MEDIAN HARDSCAPE AND LANDSCAPE PLANTING 1 LS
33 IRRIGATION SYSTEM 1 LS
34 PLANT ESTABLISHMENT AND MAINTENANCE PERIOD
(90 DAYS) 1 LS
TOTAL AMOUNT BID IN WORDS _____________________________________________ _____________________________________________________________________________ _______________________________________________________________________Dollars _____________________________________________________________________________ Bidder’s Signature Title
_____________________________________________________________________________ Company Name

Page 449 of 1292 ends

C-4
RECEIPT OF ADDENDUM NO(S). __, __, __, IS/ARE HEREBY ACKNOWLEDGED.

Before signing the contract, the lowest responsible bidder shall furnish all necessary bonds within ten (10) days after receiving the Contract notification. This bid is based upon completing the work in one hundred sixty (160) working days from the date of the Notice to Proceed.

After opening bids, the City will contact the lowest responsive/responsible bidder and inform him/her to submit signed contract, and required bonds and insurances to the City within ten (10) calendar days. These signed documents will be included in the City Council report to award the contract at the City Council Meeting to the lowest monetary bidder who will be determined by the Total Lump Sum Bid amount indicated above. Upon approval of the contract by City Council, the City will issue the “Notice to Proceed with Construction”. _____________________________________________________________________ Enclosed is a Bidder's Bond, Certified Check or Cashier's Check number ________ on the ____________________________ Bank, which is not less than ten percent (10%), as a guarantee that the undersigned will enter into the Contract if awarded to the undersigned. The undersigned further agrees that in case of default in executing the required contract with necessary bonds and insurance, within the time limits above specified, said bond or check and the money payable therein shall be forfeited to and become the property of the City of Montebello, State of California.

SIGNATURE OF BIDDER _______________________ TEL NO. (____)____________ BUSINESS ADDRESS ________________________________________________

CONTRACTOR'S LICENSE
NUMBER & EXPIRATION DATE ___________________________________________ TYPE OF LICENSE ___________________________________________ I declare under penalty of perjury that the foregoing is true and correct. ______________________________, Dated this ___ day of _ _________, 20__.

CONTRACTOR'S SIGNATURE
SURETY COMPANY'S ___________________________________________ NAME
___________________________________________

ADDRESS
___________________________________________

CITY STATE / ZIP CODE

Page 450 of 1292 ends

C-5
(_____)_________________ _(____)_____________
_____________________________________________________________________________ Bidder’s Signature Title
_____________________________________________________________________________ Company Name

Page 451 of 1292 ends

C-6

DESIGNATION OF SUBCONTRACTORS
BIDDER proposes to subcontract certain portions of the work, which are in excess of one-half of one percent of the bid, and to procure materials and equipment from suppliers and vendors as follows:

NAME, ADDRESS, LICENSE NO.,

AND PHONE NUMBER OF

SUBCONTRACTORS, SUPPLIERS, PORTION OF WORK,

AND VENDORS MATERIALS, OR EQUIPMENT
____________________________________ _____________________________ ____________________________________ _____________________________ ____________________________________ _____________________________ ____________________________________ _____________________________ ____________________________________ _____________________________ ____________________________________ _____________________________ ____________________________________ _____________________________ ____________________________________ _____________________________ ____________________________________ _____________________________ ____________________________________ _____________________________ ____________________________________ _____________________________ ____________________________________ _____________________________ ____________________________________ _____________________________ ____________________________________ _____________________________ ____________________________________ _____________________________ Prior to award of contract, Contractor shall submit a list of suppliers and vendors, in writing, to the City Engineer.

Page 452 of 1292 ends

C-7

REFERENCES
The following are the names, addresses, and telephone numbers for three public agencies for which BIDDER has performed similar work within the past two years:

1. __________________________________________________________________________ Name and Address of Agency
__________________________________________________________________________ Name and telephone number of person familiar with project __________________________________________________________________________ Contract amount Type of work Date completed

2. __________________________________________________________________________ Name and Address of Agency
__________________________________________________________________________ Name and telephone number of person familiar with project __________________________________________________________________________ Contract amount Type of work Date completed

3. __________________________________________________________________________ Name and Address of Agency
_________________________________________________________________________ Name and telephone number of person familiar with project _________________________________________________________________________ Contract amount Type of work Date completed
The following are the names, addresses, and telephone numbers of all brokers and sureties from whom BIDDER intends to procure insurance and bonds:
____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________

Page 453 of 1292 ends

C-8

EQUAL EMPLOYMENT OPPORTUNITY COMPLIANCE
BIDDER certifies that in all previous contracts or subcontractors, all reports which may have been due under the requirements of any AGENCY, State, or Federal equal employment opportunity orders have been satisfactorily filed, and that no such reports are currently outstanding.

AFFIRMATIVE ACTION CERTIFICATION
BIDDER certifies that affirmative action has been taken to seek out and consider minority business enterprises for those portions of the work to be subcontracted, and that such affirmative actions have been fully documented, that said documentation is open to inspection, and that said affirmative action will remain in effect for the life of any contract awarded thereunder.

Furthermore, BIDDER certifies that affirmative action will be taken to meet all equal employment opportunity requirements of the contract documents.

NON-COLLUSION AFFIDAVIT
BIDDER declares that the only persons or parties interested in this proposal as principals are those named herein; that no officer, agent, or employee of the AGENCY is personally interested, directly or indirectly, in this proposal; that this proposal is made without connection to any other individual, firm, or corporation making a bid for the same work and that this proposal is in all respects fair and without collusion or fraud.

Page 454 of 1292 ends

C-9
BIDDER’S INFORMATION
BIDDER certifies that the following information is true and correct:

Bidder’s Name ___________________________________________________________ Business Address: __________________________________________________________ ___________________________________________________________ Telephone ___________________________________________________________ State Contractor’s License No. and Class: ________________________________________ Original Date Issued ____________________ Expiration Date ______________________ The following are the names, titles, addresses, and phone numbers of all individuals, firm members, partners, joint ventures, and/or corporate officers having a principal interest in this proposal:
__________________________________________________________________________ __________________________________________________________________________ __________________________________________________________________________ The date of any voluntary or involuntary bankruptcy judgments against any principal having an interest in this proposal is as follows:
__________________________________________________________________________ __________________________________________________________________________ __________________________________________________________________________ All current and prior DBA’s, alias, and/or fictitious business names for any principal having an interest in this proposal are as follows:
__________________________________________________________________________ __________________________________________________________________________ __________________________________________________________________________ __________________________________________________________________________

Page 455 of 1292 ends

C-10
IN WITNESS WHEREOF, BIDDER executes and submits this proposal with the names, title, hands, and seals of all forenamed principals this ___________ day of _____________, 20___.

BIDDER______________________________________________________________________ ______________________________________________________________________________ ______________________________________________________________________________ ______________________________________________________________________________ ______________________________________________________________________________ ______________________________________________________________________________ The undersigned declares under penalty of perjury under the laws of the State of California that the representations made hereto are true and correct.
____________________________________
Signature of Contractor’s Representative
____________________________________
Printed Name
____________________________________
Title
Subscribed and sworn to this _________ day of _____________________,20_______.

NOTARY PUBLIC _____________________________________________________

Page 456 of 1292 ends

C-11
Note: The standard printed bid bond form of any bonding company acceptable to the City of Montebello may be used in lieu of the following approved sample bond form, provided the security stipulations protecting the City of Montebello are not in any way reduced by use of the surety company’s printed standard form.

PROPOSAL GUARANTEE

BID BOND
FOR

PAVING THE WAY PROGRAM

MONTEBELLO BLVD
(FROM LOS ANGELES AVE TO LINCOLN BLVD)
C.P. No. 888

IN THE CITY OF MONTEBELLO
KNOW ALL MEN BY THESE PRESENTS that ______________________________________ ______________________________________________, as BIDDER, and ________________ ______________________________________________, as SURETY, are held and firmly bound unto the City of Montebello, as AGENCY, in the penal sum of _____________________ ______________________________________________________________________________ ____________________________ dollars ($_________________), which is ten percent of the total amount bid by BIDDER to AGENCY for the above stated project, for the payment of which sum, BIDDER and SURETY agree to be bound, jointly and severally, firmly be these presents.

THE CONDITIONS OF THIS OBLIGATION ARE SUCH that, whereas BIDDER is about to submit a bid to AGENCY for the above stated project, if said bid is rejected, or if said bid is accepted and a contract is awarded and entered into by BIDDER in the manner and time specified, then this obligation shall be null and void, otherwise it shall remain in full force and effect in favor of AGENCY.

IN WITNESS WHEREOF the parties hereto have set their names, titles, hands, and seals, this _______ day of ______________, 20____.

BIDDER* _____________________________________________________________________ ______________________________________________________________________________ SURETY*_____________________________________________________________________ Subscribed and sworn to this _______ day of __________________, 20____.

NOTARY PUBLIC _____________________________________________________________ *Provide BIDDER/SURETY name, address and telephone number and the name, title, address and telephone number of authorized representative.

Page 457 of 1292 ends

C-12
BIDDER’S VIOLATION OF LAW/SAFETY QUESTIONNAIRE
FOR

PAVING THE WAY PROGRAM

MONTEBELLO BLVD
(FROM LOS ANGELES AVE TO LINCOLN BLVD)
C.P. No. 888

IN THE CITY OF MONTEBELLO
In accordance with Government Code Section 14310.5, the BIDDER shall complete, under penalty of perjury, the following questionnaire.

QUESTIONNAIRE
Has the Bidder, any officer of the bidder or any employee of the Bidder who has a proprietary interest in the Bidder ever been disqualified, removed or otherwise prevented from bidding on or completing a Federal, State or local government project because of a violation of law or a safety regulation?
Yes_________ No_________
If the answer is yes, explain the circumstances in the space provided.

Page 458 of 1292 ends

C-13
Note: The following is to be used in case cash, a cashier’s check or a certified check accompanies the proposal.

PROPOSAL GUARANTEE
CASH, CASHIER’S CHECK, OR CERTIFIED CHECK
FOR

PAVING THE WAY PROGRAM

MONTEBELLO BLVD
(FROM LOS ANGELES AVE TO LINCOLN BLVD)
C.P. No. 888

IN THE CITY OF MONTEBELLO
Accompanying this proposal is a certified check, a cashier’s check, or bidder’s bond payable to the order of the City of Montebello, or cash in the amount of _____________________________ _____________________________________________________________________________ _______________________________________________________________________ Dollars ($_____________________). The proceeds of the same shall become the property of said City if, in case this proposal shall be accepted by said City through the City Council, the undersigned shall fail to execute a contract, with and furnish the insurance and bonds required by the City of Montebello within the specified time; otherwise, the same is to be returned to the undersigned as set forth in the Instructions to Bidders.
__________________________________
__________________________________
Bidder

Page 459 of 1292 ends

D-1

CITY OF MONTEBELLO

STANDARD PUBLIC WORKS AGREEMENT
(SAMPLE)
THIS STANDARD PUBLIC WORKS AGREEMENT (“AGREEMENT”) is dated ________________________ for reference purposes only and is made and entered into by and between the CITY OF MONTEBELLO, a Municipal corporation (the “CITY”) and _____________________(“CONTRACTOR”) whose address is
__________________________________________________.

SEC. 1. RECITALS
WHEREAS, the CITY duly advertised a Notice Inviting Bids to be submitted on or before ________________________________ on ______________________________________. for the work of _________________________(describe work), (“PROJECT”).

WHEREAS, on ___________________________, the City Council accepted the bid of CONTRACTOR as the lowest responsible, responsive bid received and directed that a written contract be entered into with CONTRACTOR for the PROJECT.

NOW, THEREFORE, in consideration of the promises and the mutual covenants and agreements herein contained, the parties do hereby agree as follows:

SEC. 2. CONTRACT DOCUMENTS.

A. The CONTRACT DOCUMENTS for the PROJECT shall consist of the Notice Inviting Sealed Bids, the Instructions to Bidders, Bidders Proposal, Addendums, General Specifications and all referenced specifications, details, standard drawings, and appendices, together with this Contract and all required bonds, and insurance certificates. All of the “Contract Documents” are intended to complement the other documents so that any work called for in one, and not mentioned in the others, or vice versa, is to be executed the same as if mentioned in all of said documents. The CONTRACT DOCUMENTS are incorporated herein by this reference and made part hereof as though they were fully set forth herein.

B. In case any of the CONTRACT DOCUMENTS conflict with each other, the order of preference for the CONTRACT DOCUMENTS is:

1. This AGREEMENT

2. Appendices

3. Standard drawings

4. Details

5. Special Provisions, if any

6. Addendums

Page 460 of 1292 ends

D-2

7. General Specifications and all referenced specifications

8. Bidders Proposal

9. Instructions to Bidders

10. Notice Inviting Sealed Bids
SEC. 3. THE WORK.

For and in consideration of the payments and agreements to be made and performed by CITY, CONTRACTOR agrees to furnish all materials and perform all work required for the PROJECT and to fulfill all other obligations as set forth in the CONTRACT DOCUMENTS.

SEC. 4. COMPENSATION.

CONTRACTOR hereby agrees to receive and accept the total amount of ________________________________________, which is based on performing all of the work shown on Bidders Proposal as full compensation for furnishing all materials, performing all work, and fulfilling all obligations hereunder. Said compensation shall cover all expenses, losses, damages, and consequences arising out of the nature of the work during its progress or prior to its acceptance including those for well and faithfully completing the work and the whole thereof in the manner and time specified in the CONTRACT DOCUMENTS, and also including those arising from actions of the elements, unforeseen difficulties or obstructions encountered in the prosecution of the work, suspension or discontinuance of the work, and all other unknowns or risks of any description connected with the work. CITY shall herein retain five percent (5%) of said price until said time as the provisions of SEC. 18 herein have been met.

Sec. 4.1. Progress Payments
Progress Payments shall be made in accordance with section ________ of the General Provisions and the provisions of this Section 4.1. Upon receipt of a properly presented payment request, the CITY shall process the payment request in accordance with Public Contracts Code Section 20104.5. The CITY shall review the payment request as soon as possible. If the CITY rejects the payment request, it shall be returned to the CONTRACTOR within seven days of its receipt by the CITY with an explanation for the reasons of its rejection. If the payment request is approved in writing by the CITY, payment shall be made in thirty (30) days of receipt of an undisputed and properly presented payment request. Late payments shall bear interest at the legal rate of interest in accordance with Code of Civil Procedure 685.010. CITY shall pay CONTRACTOR a sum based upon ninety five percent (95%) of the contract price apportionment of the labor and materials incorporated into the work under the contract during the period covered by said statement. The remaining five percent (5%) thereof shall be retained as performance security. Refer to Section 4.2 of this Agreement for retention of funds.

Sec. 4.2. Retention of Funds
Progress payments shall be made in accordance with the provisions of Section 4.1 of this Agreement. In accordance with said section, CITY shall pay CONTRACTOR a sum based upon ninety five percent (95%) of the contract price in proportion to the labor and materials incorporated into the

Page 461 of 1292 ends

D-3
work under the contract during the month covered by said statement. The remaining five percent (5%) thereof shall be retained as performance security to be paid to the CONTRACTOR within sixty (60) days after final acceptance of the work by the City Council, after CONTRACTOR shall have furnished CITY with a release of all undisputed contract amounts, if required by CITY. In the event there are any claims specifically excluded by CONTRACTOR from the operation of the release, the CITY may retain proceeds (per Public Contract Code 7107) of up to 150% of the amount in dispute. CITY’s failure to deduct or withhold shall not affect CONTRACTOR’s obligations hereunder.

Sec. 4.3. Substitution of Securities.

Pursuant to Public Contracts Code Sec. 22300 CONTRACTOR shall be allowed to substitute securities for any moneys withheld by the CITY to ensure performance under a contract, unless, federal regulations or policies, or both, do not allow the substitution of securities. At the request and expense of the CONTRACTOR, securities equivalent to the amount withheld shall be deposited with the CITY, or with a state or federally chartered bank in this state as the escrow agent, who shall then pay those moneys to the CONTRACTOR. Upon satisfactory completion of the contract, the securities shall be returned to the contractor.

SEC. 5. UNDOCUMENTED WORKERS.

CONTRACTOR hereby promises and agrees to comply with all of the provisions of Federal and/or State law as the same shall apply to this PROJECT pertaining to the employment of unauthorized aliens as defined therein. Should CONTRACTOR so employ unauthorized aliens for the performance of work and/or services covered by this Contract, and should the Federal Government impose sanctions against the CITY for use of unauthorized aliens, CONTRACTOR hereby agrees to, and shall, hold harmless, indemnify and defend CITY for the cost of all such sanctions imposed, together with any and all costs, including attorneys’ fees, incurred by the CITY in connection therewith.

SEC. 6. NOTICE TO PROCEED.

CONTRACTOR shall commence work on the date specified in the Notice to Proceed to be issued in writing to CONTRACTOR by the CITY and shall complete work on the PROJECT within one hundred sixty (160) Working Days from the commencement thereof.

SEC. 7. DISCOVERY OF HAZARDOUS OR LATENT CONDITIONS.

A. CONTRACTOR shall, without disturbing the condition, notify CITY in writing as soon as CONTRACTOR, or any subcontractor, agent or employees have knowledge and reporting is possible, of the discovery of any of the following conditions:

1. The presence of any material that the CONTRACTOR believes is hazardous waste, as defined in Section 25117 of the Health and Safety Code;

2. Subsurface or latent physical conditions at the site differing from those indicated in the specifications; or,

Page 462 of 1292 ends

D-4

3. Unknown physical conditions at the site of any unusual nature, different materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in this Contract.

B. Pending a determination by the CITY of appropriate action to be taken, CONTRACTOR shall provide security measures (e.g., fences) adequate to prevent the hazardous waste or physical conditions from causing bodily injury to any person.

C. CITY shall promptly investigate the reported conditions. If CITY, through the City Engineer or his/her designee, and in the exercise of its sole discretion, determines that the conditions do materially differ, or do involve hazardous waste, and will cause a decrease or increase in the CONTRACTOR’s cost of or time required for performance of any part of the work, then CITY shall issue a change order.

D. In the event of a dispute between CITY and CONTRACTOR as to whether the conditions materially differ or involve hazardous waste or cause a decrease or increase in the CONTRACTOR’s cost of, or time required for performance of any part of the work, CONTRACTOR shall not be excused from any schedule completion date, and shall proceed with all work to be performed under the Contract. CONTRACTOR shall retain any and all rights which pertain to the resolution of disputes and protests between the parties.

SEC. 8. MISCELLANEOUS STATUTORY REQUIREMENTS
Sec. 8.1. Contractor License.

CONTRACTOR shall possess a california contractor’s license type “A” for the performance of the Project.

Sec. 8.2. Ineligible Contractor Prohibited.

Any contractor or subcontractor who is ineligible to perform work on a public works project pursuant to Section 1777.1 or 1777.7 of the Labor Code is prohibited from performing work under this Agreement.

Sec. 8.3. Compliance with SB 854 Registration.

This Project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. No prime contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. No prime contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. The CONTRACTOR will be required to post job site notices as described in 8 California Code of Regulation section 16451(d).

Sec. 8.4. Trench and Pipeline Safety.

If this Contract is for more than $25,000 and involves excavation of any trench five feet or more in depth, the CONTRACTOR shall submit a detailed plan of shoring, bracing, sloping or other provisions to be made for worker protection in accordance with Labor Code Section 6705. Such plan shall be approved by a qualified representative of the CITY.

Page 463 of 1292 ends

D-5
Sec. 8.5. Utility Relocation.

CITY is responsible for removal, relocation, or protection of existing main or trunkline utilities to the extent such utilities were not identified in the invitation for bids or specifications. CITY shall reimburse contractor for any costs incurred in locating, repairing damage not caused by contractor and removing or relocating such unidentified utility facilities, including equipment idled during such work.

CONTRACTOR shall not be assessed liquidated damages for delay arising from the removal or relocation of such unidentified utility facilities.

Sec. 8.6. Third Party Claims Notification.

The CITY shall timely notify the CONTRACTOR in writing of any third party claims relating to the Agreement.

Sec. 8.7. Unfair Business Practices Claims.

The CONTRACTOR or subcontractor offers and agrees to assign to the CITY all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C.

Section 15) or under the Cartwright Act (Chapter 2, (commencing with Section 16700) of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, services or materials pursuant to the public works contract or the subcontract. This assignment shall be made and become effective at the time the CITY renders final payment to the CONTRACTOR without further acknowledgment by the parties. (Section 7103.5, California Public Contract Code.).

Sec. 8.8. Day’s Work.

CONTRACTOR acknowledges that under California Labor Code sections 1810 and following, 8 hours of labor constitutes a legal day’s work. CONTRACTOR will forfeit as a penalty to CITY the sum of $25.00 for each worker employed in the execution of this Contract by CONTRACTOR or any subcontractor for each calendar day during which such worker is required or permitted to work more than 8 hours in any one calendar day and 40 hours in any one calendar week in violation of the provisions of Labor Code section 1810. (Labor Code § 1813).

Sec. 8.9. Payroll Records.

CONTRACTOR shall maintain the certified payroll records required by Labor Codes Sec. 1776 and shall report such records directly to the California Labor Commissioner as required by Labor Code Sec. 1771.4. The CONTRACTOR shall inform the CITY of the location of the records enumerated under Labor Code Sec. 1776, including the street address, city, and county, and shall, within five working days, provide a notice of a change of location and address.

Sec. 8.10. Employment of Apprentices.

Nothing in this Contract prevents CONTRACTOR or any subcontractor from employing properly registered apprentices in the execution of the Contract. CONTRACTOR is responsible for compliance with Labor Code section 1777.5 for all apprenticeable occupations. This statute requires that contractors and subcontractors must submit contract award information to the applicable joint apprenticeship committee, must employ apprentices in apprenticeable occupations in a ratio of not less than one hour of apprentice’s work for every five hours of labor performed by a journeyman (unless an exception is granted under §1777.5), must contribute to the fund or funds in each craft or trade or a like amount to the California Apprenticeship Council, and that contractors and subcontractors must not discriminate among otherwise qualified employees as apprentices solely on the ground of sex, race,

Page 464 of 1292 ends

D-6
religion, creed, national origin, ancestry or color. Only apprentices defined in Labor Code section 3077, who are in training under apprenticeship standards and who have written apprentice contracts, may be employed on public works in apprenticeable occupations.

Sec. 8.11. Records Audit
In accordance with Government Code, Section 8546.7, records of both the CITY and the CONTRACTOR shall be subject to examination and audit by the Auditor General for a period of three (3) years after final payment.

SEC. 9. PREVAILING WAGES
A. CONTRACTOR shall pay prevailing Wage rates for this Project in accordance with the “General Wage Determination Made by the Director of Industrial Relations Pursuant to California Labor Code, Part 7, Chapter 1, Article 2, Sections 1770, 1773 and 1773.1", for Los Angeles County.

Wage rates shall conform with those posted at __________________ and the Project site.

B. The following Labor Code sections are hereby referenced and made a part of this Agreement:

1. Section 1775 - Penalty for Failure to Comply with Prevailing Wage Rates.

2. Section 1777.4 - Apprenticeship Requirements.

3. Section 1777.5 - Apprenticeship Requirements.

4. Section 1813 - Penalty for Failure to Pay Overtime.

5. Sections 1810 and 1811 - Working Hour Restrictions.

6. Section 1775 - Payroll Records.

7. Section 1773.8 - Travel and Subsistence Pay.

SEC. 10. INDEMNITY, DEFENSE AND HOLD HARMLESS
A. CONTRACTOR shall indemnify, defend with legal counsel approved by CITY, and hold harmless CITY, its officers, officials, employees and volunteers from and against all liability, loss, damage, expense, cost (including without limitation reasonable legal counsel fees, expert fees and all other costs and fees of litigation) of every nature arising out of or in connection with CONTRACTOR's negligence, recklessness or willful misconduct in the performance of work hereunder or its failure to comply with any of its obligations contained in this Agreement, except such loss or damage which is caused by the sole or active negligence or willful misconduct of the CITY. Should conflict of interest principles preclude a single legal counsel from representing both CITY and CONTRACTOR, or should CITY otherwise find CONTRACTOR’s legal counsel unacceptable, then CONTRACTOR shall reimburse the CITY its costs of defense, including without limitation reasonable legal counsel fees, expert fees and all other costs and fees of litigation. The CONTRACTOR shall promptly pay any final judgment rendered against the CITY (and its officers, officials, employees and volunteers) with respect to claims determined by a trier of fact to have been the result of the CONTRACTOR’s negligent, reckless or wrongful performance. It is expressly understood and agreed that the foregoing provisions are intended to be as broad and inclusive as is permitted by the law of the State of California and will survive termination of this Agreement.

Page 465 of 1292 ends

D-7
B. CONTRACTOR obligations under this section apply regardless of whether such claim, charge, damage, demand, action, proceeding, loss, stop notice, cost, expense, judgment, civil fine or penalty, or liability was caused in part or contributed to by an Indemnitee. However, without affecting the rights of CITY under any provision of this agreement, CONTRACTOR shall not be required to indemnify and hold harmless CITY for liability attributable to the active negligence of CITY, provided such active negligence is determined by agreement between the parties or by the findings of a court of competent jurisdiction. In instances where CITY is shown to have been actively negligent and where CITY’S active negligence accounts for only a percentage of the liability involved, the obligation of CONTRACTOR will be for that entire portion or percentage of liability not attributable to the active negligence of CITY.

SEC. 11. BONDS.

A. CONTRACTOR, before commencing said PROJECT, shall furnish and file with CITY, a Performance Bond, or bonds in the sum of one hundred percent (100%) of the Agreement price thereof conditioned upon the faithful performance of this Agreement in the form attached hereto as Exhibit “B.”.

B. CONTRACTOR, before commencing said PROJECT, shall furnish and file with CITY, a Payment Bond in the sum of 100% of the Agreement price, conditioned upon the payment of all labor and materials furnished in connection with this Agreement in the form attached hereto as Exhibit “C.” SEC. 12. INSURANCE REQUIREMENTS.

Prior to commencing work hereunder, CONTRACTOR shall provide the CITY with proof of insurance naming the CITY and each of its directors, officers, agents, and employees as additional-named insureds on a policy or policies of insurance providing and maintaining the coverages set forth in the Insurance Schedule attached hereto as Exhibit A. CITY shall have the right to hold the policies and policy renewals, and CONTRACTOR shall promptly furnish to CITY all renewal notices and all receipts of paid premiums. CITY may make proof of loss if not made promptly by CONTRACTOR.

SEC. 13. LIQUIDATED DAMAGES.

See Section 6-9 Liquidated Damages of the General Provisions. In addition, pursuant to the authority of California Public Contracts Code Section 7102, CITY and CONTRACTOR agree that the determination of actual damages for any unreasonable delay in performance of this Agreement caused by CITY would be extremely difficult or impractical to determine in the event of a breach of this Agreement by CITY. Therefore, if the CITY is determined to be liable for such unreasonable delays, the CITY and its sureties shall be liable to the CONTRACTOR for the sum of five hundred dollars ($500.00) as liquidated damages for each working day of delay in the performance of any service required hereunder

Page 466 of 1292 ends

D-8
SEC. 14. DISPUTE RESOLUTION
Sec. 14.1. Claims of $375,000 or Less
A. A claim by the CONTRACTOR for a time extension, for money damages for work, or a payment disputed by the CITY must be submitted to a resolution process in accordance with Public Contracts Code Sections 21040-21040.4. A summary of Sections 21040-21040.4 are as follows:
(1) Informal negotiation between the CITY and CONTRACTOR. (2) Mediation with the CONTRACTOR.
(3) Court mandated Arbitration.
(4) Court trial. If the party requesting the court trial does not prevail, then that party must pay all court costs and attorney's fees.

Sec. 14.2 Public Contracts Code 9204 Claims
CONTRACTOR shall comply with the procedure set forth in Public Contracts Code section 9204 for any claim, as that term is defined therein, for one or more of the following: 1) a time extension, including, without limitation, for relief from damages or penalties for delay, 2) payment of money or damages arising from work done pursuant to this Agreement, and/or 3) payment of an amount disputed by the CITY under this Agreement. A summary of the provisions of Public Contracts Code Section 9204 is as follows:

1. CONTRACTOR must send a claim to the CITY for a time extension, payment for work not in the Agreement, or payments disputed by the CITY by registered mail or certified mail with return receipt requested.

2. CITY must respond within 45 days as to which claims are disputed and undisputed.

3. If claim remains in dispute, CONTRACTOR may request informal meet and confer meeting with CITY.

4. After meet and confer, a disputed claim remaining shall be submitted to non-binding mediation.

5. All undisputed claims shall be paid within 60 days.

SEC. 15. TERMINATION.

Sec. 15.1. Termination for Convenience.

The CITY may terminate this contract, in whole or in part, with 30 days written notice to the CONTRACTOR when it is in the CITY’s best interest. The CONTRACTOR shall be paid its costs, including contract close-out costs, and profit on work performed up to the time of termination. The CONTRACTOR shall promptly submit its termination claim to CITY to be paid the CONTRACTOR. If the CONTRACTOR has any property in its possession belonging to the CITY, the CONTRACTOR will account for the same, and dispose of it in the manner the CITY directs. The CONTRACTOR may terminate this contract, in whole, with 90 days written notice to the CITY.

Page 467 of 1292 ends

D-9
Sec. 15.2 Termination for Default.

If at any time the CONTRACTOR is determined to be in material breach of the Contract, a Notice of Potential Breach of Contract shall be prepared by the CITY, and will be served upon the CONTRACTOR and its sureties. If the CONTRACTOR continues to neglect or refuses to comply with the Contract or with the Notice of Potential Breach of Contract to the satisfaction of the CITY within the time specified in such Notice, the CITY shall have the authority to terminate the Contract for this Project.

Sec. 15.3 Waiver of Remedies for any Breach.

In the event that CITY elects to waive its remedies for any breach by CONTRACTOR of any covenant, term or condition of this Contract, such waiver by CITY shall not limit CITY’s remedies for any succeeding breach of that or of any other term, covenant, or condition of the Contract.

SEC. 16. CONTRACTOR'S FAILURE TO PROCURE COMPLETION OF PROJECT In the event CONTRACTOR fails to furnish tools, equipment, or labor in the necessary quantity or quality, or fails to prosecute the work or any part thereof contemplated by this Agreement in a diligent and workmanlike manner, and if the CONTRACTOR for a period of three (3) calendar days after receipt of written demand from CITY or its designated representative to do so, fails to furnish tools, equipment, or labor in the necessary quantity or quality, and to prosecute its work and all parts thereof in a diligent and workmanlike manner, or after commencing to do so within said three (3) calendar days, fails to continue to do so; then the CITY may exclude the CONTRACTOR from the premises, or any portion thereof, and take possession of said premises or any portion thereof, together with all material and equipment thereon, and may complete the work contemplated by this Agreement or any portion of said work, either by furnishing the tools, equipment, labor or material necessary, or by letting the unfinished portion of said work, or the portion taken over by the CITY to another contractor or by a combination of such methods. In any event, the procuring of the completion of said work, or the portion thereof taken over by the CITY, shall be a charge against the CONTRACTOR, and may be deducted from any money due or becoming due to CONTRACTOR from the CITY, or the CONTRACTOR shall pay the CITY the amount of said charge, or the portion thereof unsatisfied. The sureties, provided for under this Agreement shall become liable for payment should CONTRACTOR fail to pay in full any said cost incurred by the CITY.

SEC. 17. COMPLIANCE WITH APPLICABLE LAWS.

CONTRACTOR hereby promises and agrees to comply with all of the provisions of all applicable state and federal laws in connection with the performance of its obligations under this Contract.

SEC. 18. NOTICE OF COMPLETION.

Upon completion of the PROJECT and acceptance of same by the City Council, the CITY Administrator shall have cause to be recorded a Notice of Completion with the office of the Los Angeles County Recorder; and, after thirty-five (35) days from the date said Notice of Completion is recorded, the Director of Finance of CITY shall release the funds retained pursuant to SEC. 4 hereof; provided there have been no mechanics’ liens or stop notices filed against said work which have not been paid, withdrawn or eliminated as liens against said work.

Page 468 of 1292 ends

D-10
SEC. 19. AUTHORITY.

Any person executing this Contract on behalf of the CONTRACTOR warrants and represents that he or she has the authority to execute this Contract on behalf of the CONTRACTOR and has the authority to bind the CONTRACTOR to the performance of its obligations hereunder.

SEC. 20. ENTIRE CONTRACT.

This Contract, including the Contract Documents and any other documents incorporated herein by specific reference, represents the entire and integrated Contract between the CITY and the CONTRACTOR. This Contract supersedes all prior oral or written negotiations, representations or agreements. This Contract may not be modified or amended, nor any provision or breach waived, except in a writing signed by both parties that expressly refers to this Contract.

SEC. 21. ATTORNEY’S FEES AND COSTS.

If either party to this Contract is required to initiate or defend or made a party to any action or proceeding in any way connected with this Contract, the prevailing party in such action or proceeding, in addition to any other relief which may be granted, whether legal or equitable, shall be entitled to reasonable attorney's fees. Attorney's fees shall include attorney's fees on any appeal, and in addition a party entitled to attorney's fees shall be entitled to all other reasonable costs for investigating such action, taking depositions and discovery and all other necessary costs the court allows which are incurred in such litigation. All such fees shall be deemed to have accrued on commencement of such action and shall be enforceable whether or not such action is prosecuted to judgment.

SEC. 22. INDEPENDENT CONTRACTOR.

The CONTRACTOR is and shall at all times remain as to the CITY, a wholly independent contractor.

Neither the CITY, nor any of its officers, employees or agents shall have control over the conduct of the CONTRACTOR or any of the CONTRACTORs’ officers, employees or agents, except as herein set forth. The CONTRACTOR shall not at any time or in any manner represent that it or any of its officers, employees or agents are in any manner officers, employees or agents of the CITY, nor shall CITY officers, employees or agents be deemed the officers, employees, or agents of CONTRACTOR as a result of this Contract.

SEC. 23. NOTICE.

Any notice, demand, request, document, consent, approval, or communication either party desires or is required to give to the other party or any other person shall be in writing and shall be deemed to be given when served personally or deposited in the U.S. Mail, prepaid, first-class mail, return receipt requested, addressed as follows:

To CITY: City of Montebello
Attention: Director of Public Works / City Engineer
To CONTRACTOR: ____________________________
____________________________
____________________________
____________________________

Page 469 of 1292 ends

D-11
SEC. 24. PROHIBITION AGAINST ASSIGNMENT.

The experience, knowledge, capability and reputation of CONTRACTOR, its principals and employees were a substantial inducement for the CITY to enter into this Contract. Neither this Contract nor any interest herein may be transferred, assigned, conveyed, hypothecated or encumbered voluntarily or by operation of law, whether for the benefit of creditors or otherwise, without the prior written approval of CITY. Transfers restricted hereunder shall include the transfer to any person or group of persons acting in concert of more than twenty five percent (25%) of the present ownership and/or control of CONTRACTOR, taking all transfers into account on a cumulative basis. In the event of any such unapproved transfer, including any bankruptcy proceeding, this Contract shall be void. No approved transfer shall release the CONTRACTOR or any surety of CONTRACTOR of any liability hereunder without the express consent of CITY.

SEC. 25. CUMULATIVE REMEDIES.

The provisions of this Contract are cumulative and in addition to and not in limitation of any rights or remedies available to CITY.

SEC. 26. COUNTERPARTS.

This Contract may be executed in counterpart originals, duplicate originals, or both, each of which is deemed to be an original for all purposes.

IN WITNESS WHEREOF the parties hereto have caused this Contract to be executed on the date next to their respective officers duly authorized signatures in that behalf.

CITY OF MONTEBELLO
By: ___________________________________
Mayor
Date: _________________________________
ATTEST:
______________________________________
City Clerk

APPROVED AS TO FORM
_______________________________________
City Attorney

CONTRACTOR
By: ___________________________________
Date:
__________________________________
By: ___________________________________
Date:
__________________________________

Page 470 of 1292 ends

D-12
EXHIBIT “A”

INSURANCE REQUIREMENTS
On or before beginning any of the work called for by any term of this Contract, CONTRACTOR, at its own cost and expense, shall carry, maintain for the duration of this Contract, and provide proof thereof that is acceptable to CITY of its procurement of the insurance specified below from insurers and under forms of insurance satisfactory in all respects to CITY. Such insurance shall not be in derogation of CONTRACTOR’s obligations to provide indemnity under this Contract.

1. Comprehensive General Liability and Automobile Liability Insurance Coverage.

CONTRACTOR shall carry and maintain Comprehensive General Liability and Automobile Liability Insurance which provides the following:

Minimum coverage: Bodily injury limits of $2,000,000 for each person and $2,000,000 for each occurrence; property damage limits of $2,000,000 for each occurrence, $5,000,000 aggregate.

Products/Completed Operations Hazard Insurance in an amount of not less than FIVE MILLION DOLLARS ($5,000,000);
A combined single limit policy with aggregate limits in an amount of not less than Five MILLION DOLLARS ($5,000,000) shall be considered equivalent to the said required minimum limits set forth herein above.

If a Commercial General Liability Insurance form or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to the work to be performed under this Contract or the general aggregate limit shall be at least twice the required occurrence limit.

Such coverage shall include but shall not be limited to, protection against claims arising from bodily and personal injury, including death resulting therefrom, and damage to property resulting from activities contemplated under this Contract, including the use of owned and non-owned real property and automobiles. Insurance coverage shall not be subject to any type of pollution exclusion or owned property exclusions.

2. Automobile Liability.

CONTRACTOR shall carry and maintain Automobile Liability Insurance which provides a minimum coverage of at least $5,000,000 per accident for bodily injury and property damage.

3. Worker's Compensation.

CONTRACTOR shall carry and maintain worker’s compensation in the amount of $1,000,000 as required by the California Labor Code for all persons employed directly or indirectly in connection with this Contract by CONTRACTOR. To the extent that CONTRACTOR utilizes any subcontractor for the performance of any part of the work under this Contract, CONTRACTOR shall require and assure that such subcontractor also carry and maintain worker’s compensation as required by the California Labor Code for all persons directly or indirectly in connection with this

Page 471 of 1292 ends

D-13
Contract.

4. Additional Insureds.

The CITY, its officers, agents and employees must be named as additional insureds or as additional loss payees in all insurance policies required by this Contract. An endorsement to this effect shall be delivered to CITY prior to the commencement of any work. Satisfaction of any deductible requirement shall be the responsibility of CONTRACTOR. Such insurance shall be primary and noncontributory with any other insurance maintained by the CITY.

5. Notice of Cancellation.

CONTRACTOR agrees to oblige its insurance agent or broker and insures to provide CITY with a thirty (30) day notice of cancellation (except for nonpayment for which a ten (10) day notice is required) or nonrenewal of coverage for each required coverage.

6. Severability Clause.

Each of the policies of insurance shall contain a clause substantially as follows:

The insurance afforded by this policy applies separately to each insured against whom a claim or suit is made or suit is brought, except with respect to the limit of the insurer's liability.

7. Qualifications of Insurer.

All policies of insurance shall be issued by an insurance company acceptable to CITY and authorized to issue said policy in the State of California.

8. Approval of Insurer.

The insurance carrier providing the insurance shall be chosen by CONTRACTOR subject to approval by CITY, provided that such approval shall not be unreasonably withheld.

9. Payment of Premiums.

All premiums on insurance policies shall be paid by CONTRACTOR making payment, when due, directly to the insurance carrier, or in a manner agreed to by CITY.

10. Evidence of Insurance and Claims.

CONTRACTOR shall provide certificates of insurance to CITY as evidence of insurance coverage required herein, along with a waiver of subrogation endorsement for workers’ compensation. The CITY’s Risk Manager must approve insurance certificates and endorsements prior to commencement of performance. Current certification of insurance shall be kept on file with the CITY at all times during the term of this Contract. The CITY reserves the right to require complete, certified copies of all required insurance policies, at any time.

Page 472 of 1292 ends

D-14
(Use of City Bond Form is Required)
EXHIBIT “B”

FAITHFUL PERFORMANCE BOND

PUBLIC WORK (CALIFORNIA)
KNOW ALL MEN BY THESE PRESENTS:

WHEREAS, the Principal and the City of Montebello (“Obligee”) have entered into a written contract, hereinafter called the Contract, a copy of which is or may be attached hereto, dated the ______ day of ____________________, ______ referred to and made a part hereof for __________________________________________________________________________ and all appurtenant work in accordance with Project No. , which agreement requires the Principal to provide Obligee with this bond.

NOW THEREFORE, we, _______________________________________, as Principal, and ___________________________________________, a corporation organized under the laws of _________________________, and duly authorized to transact business in the State of California, as Surety, are held firmly bound unto the City of _____________________________, as Obligee, in the sum of _________________________________________________________________ Dollars ($_______________________), lawful money of the United States of America, which is 100% of the amount of the Contact,for the payment whereof well and truly to be made the Principal and Surety bind themselves, their heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents.

The address at which the Surety may be served with notices, papers and other documents is:
______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________ The address at which the Principal may be served with notices, papers and other documents is:
______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________ The condition of the foregoing obligation is such that if the Principal, his or its heirs, executors, administrators, successors or assigns, and each of his or its subcontractors shall well and truly perform and fulfill all the undertakings, covenants, terms, conditions, and agreements of said contract, and during the life of any guaranty required under the contract, and shall also well and truly perform and fulfill all the undertakings, covenants, terms, conditions, and agreements of any and all duly authorized modifications of said contract that may hereafter be made, then this obligation shall be void; otherwise it shall be and remain in full force and effect.

As part of the obligation secured hereby and in addition to the face amount specified therefor, there shall be included costs and reasonable expenses and fees, including reasonable attorney's fees, incurred by the obligee in successfully enforcing such obligation, all to be taxed as costs and included in any judgment rendered.

The Surety hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the agreement or to the work to be performed thereunder or the specifications accompanying the same shall in any way affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the agreement or to the work or to the specifications.

Page 473 of 1292 ends

D-15
This document is signed by the respective parties on the dates next to their names.

Principal
By: __________________________________
Title: ________________________________
Surety
By: __________________________________
Title: ________________________________
Date: ________________________________
Date: ________________________________
I declare under penalty of perjury under the laws of the State of California that the contents of the above Faithful Performance Bond are true and correct, and that I have been duly authorized to sign this Faithful Performance Bond on behalf of Surety. This Declaration is signed on , in the City of , State of California.
--OR--
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document State of California )
)
County of ___________________________ )
On ______________ before me, ____________________________________(here insert name and title of the officer), personally appeared ___________________________________________________________________, who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature __________________________________ (Seal)
-- AND –
(Proof of signature authorization or power of attorney must be attached) APPROVED AS TO FORM:
_________________________
City Attorney

Page 474 of 1292 ends

D-16
EXHIBIT “C”
Labor and Materials Payment Bond
(Use of City Bond Form is Required)

LABOR AND MATERIAL PAYMENT BOND

PUBLIC WORK (CALIFORNIA)
KNOW ALL MEN BY THESE PRESENTS:

WHEREAS, ________________________________________, as Principal, has entered into a contract dated ___________________, _____, (the "Contract") with the City of MONTEBELLO (Obligee) referred to and made a part hereof to perform the following work of public improvement, to wit:
_____________________________________________________________________________________ _____________________________________________________________________________________ __________________________________________________________and all appurtenant work in accordance with the plans and specifications for Project No._______, which requires Principal to file this bond to secure claims made under Civil Code Sections 9550-9554..

NOW THEREFORE, we, ____________________________________, as Principal, and ___________________________________________, a corporation organized under the laws of ______________________ and duly authorized to transact business in the State of California, as Surety, are held firmly bound unto the City of _____________________________, as Obligee, and all subcontractors, laborers, material persons and other persons employed in the performance of the referenced agreement, in the sum of _________________________________________________ Dollars ($_______________________), lawful money of the United States of America, which is 100% of the amount of the Contract, for the payment whereof well and truly to be made the Principal and Surety bind themselves, their heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents.

The address at which the Surety may be served with notices, papers and other documents is:
______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________ The address at which the Principal may be served with notices, papers and other documents is:
______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________ If the above bounden Principal, his or its heirs, executors, administrators, successors, assigns, or any of his or its subcontractors, fails to pay for any materials, provisions, provender, or other supplies, or teams, implements or machinery, used in, upon, for or about the performance of the work contracted to be done, or for any work or labor to persons named in Section 9100 of the Civil Code, or for amounts due under the Unemployment Insurance Code with respect to such work or labor performed under the Contract, or for any amounts required to be deducted, withheld and paid over to the Employment Development Department from the wages of employees of the contractor and subcontractors pursuant to Section 13020

Page 475 of 1292 ends

D-17
of the Unemployment Insurance Code, then the Surety on this bond will pay the same, in an amount not exceeding the sum specified in this bond, and also, in case suit is brought upon this bond, a reasonable attorney's fee, which shall be awarded by the court to the prevailing party in said suit, said attorney's fee to be taxed as costs in said suit and to be included in the judgment herein rendered.

As part of the obligation secured hereby, the Surety shall not be exonerated or released from the obligation of the bond by any change, alteration, or modification in or of any contract, plans, specifications, or agreement pertaining or relating to any scheme or work of improvement or pertaining or relating to the furnishing of labor, materials, or equipment therefor, nor by any change or modification of any terms of payment or extension of the time for any payment pertaining or relating to any scheme of work of improvement, nor by any rescission or attempted rescission of the contract, agreement or bond, nor by any conditions precedent or subsequent in the bond attempting to limit the right of recovery of claimants otherwise entitled to recover under any such contract or agreement, or under the bond, nor, where the bond is given for the benefit of claimants, by any fraud practiced by any person other than the claimant seeking to recover on the bond.

This bond shall inure to the benefit of any and all persons, companies and corporations named in Civil Code Section 9100 so as to give them a right of action in a suit on this bond.

This bond is executed for the purpose of complying with the laws of the State of California designated as Title 3, Chapter 5, Payment Bond, commencing with Section 9550 of the Civil Code of the State of California and all amendments thereto, and shall inure to the benefit of any of the persons named in Section 9100 of the Civil Code of the State of California.

This document is signed by the respective parties on the dates next to their names.

Principal
By: _________________________________
Title: ________________________________
Surety
By: _________________________________
Title: ________________________________
Date: ________________________________
Date: ________________________________
I declare under penalty of perjury under the laws of the State of California that the contents of the above Labor and Materials Payment Bond are true and correct, and that I have been duly authorized to sign this Labor and Materials Payment Bond on behalf of Surety. This Declaration is signed on ______ , in the City of _____, State of California.
--OR--

Page 476 of 1292 ends

D-18
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document State of California )
)
County of ___________________________ )
On ______________ before me, ____________________________________(here insert name and title of the officer), personally appeared ___________________________________________________________________, who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature __________________________________ (Seal)
-- AND –
(Proof of signature authorization or power of attorney must be attached) APPROVED AS TO FORM:
________________________
City Attorney

Page 477 of 1292 ends

E-1

GENERAL SPECIFICATIONS
FOR

PAVING THE WAY PROGRAM

MONTEBELLO BLVD
(FROM LOS ANGELES AVE TO LINCOLN BLVD)
C.P. No. 888

IN THE CITY OF MONTEBELLO

SCOPE OF WORK
The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals to perform the work shown in the Plans, Specifications, and contract documents. The general items of work include removal of existing concrete improvement and replace with asphalt concrete pavement, construct median curbs, cold mill existing pavement, construct asphalt concrete pavement, reconstruction including replacing existing curb and gutter, access ramps, and traffic striping, markers, pavement markings and curb painting.

LOCATION OF WORK
The general locations and limits of the work are as follows:

TIME FOR COMPLETION
The Contractor shall complete all construction work in every detail within one hundred sixty (160) working days after the date in the Notice to Proceed to be issued by the City for the awarded improvements.

NOTIFICATION
The Contractor shall notify the City of Montebello and the owners of all utilities and substructures not less than forty-eight (48) hours (2 working days) prior to starting construction. The following list of names and telephone numbers is intended for the convenience of the Contractor and is not guaranteed to be complete or correct:

Central
Basin
MWD
Isabelle
Guido
6252 Telegraph Rd
Commerce CA 90040
(323) 201-5541
[email protected]
Chevron
Environmental
Management
Company
Allen
Just
18401 Von Karman Ave
Ste 300
Irvine, CA 92612
(714) 508-2677
[email protected]

Page 478 of 1292 ends

E-2
Crimson
Pipeline LP
Shannon
Lovrien
3760 Kilroy Airport
Way
Suite 300
Long Beach, CA 90806
(562) 285-4107
MCI
(Verizon
Business)
400 International Pkwy
Richardson, TX 75081
[email protected]
City of
Montebello
Sewer
Juan
Hernandez
1600 W Beverly Bl
Montebello, CA 90640
[email protected]
Montebello
Land & Water
Company
Korey 1600 W Beverly Bl
Montebello, CA 90640
[email protected]
Crown Castle Fiber
Dig
1500 Corporate Dr
Canonsburg, PA 15317
(800) 654-3110
[email protected]
Redflex
Traffic
Systems
5651 W Talavi Blvd
Suite 200
Glendale, AZ 85306
(800) 568-8405
[email protected]
SoCalGas
Distribution
Belvedere
Jason
Sum
701 N Long Beach Blvd
Compton, CA 90221
(310) 687-2011
[email protected]
[email protected]
San Gabrial
Vally Water
Company
Kailyn
Phu
11142 E Garvey Ave
El Monte, CA 91733
(626) 448-6183
[email protected]
Spectrum -
Irwindale
David
Scharrer
4781 Irwindale Ave
Irwindale, CA 91706
626-430-3522
[email protected]
SCE Trans
Telecom,
Utiliquest for
SCE Dist -
Metro East &
West Reg
Engineering 14005 S Benson Ave
Chino, CA 91710
[email protected]
CITY POLICE AND FIRE DEPARTMENT Police: (323) 887-1313
Fire: (323) 887-4510
UNDERGROUND SERVICE ALERT (800) 422-4133 Tel
(909) 808-8101 Fax
TRASH COLLECTORS – ATHENS DISPOSAL (626) 336-6100
STREET SWEEPING – NATIONWIDE (562) 860-0604

Page 479 of 1292 ends

E-3
MONTEBELLO UNIFIED SCHOOL DISTRICT (323) 887-7900
MONTEBELLO TRANSIT (323) 558-1625

EMERGENCY INFORMATION
The names addresses and telephone numbers of the Contractor and subcontractors, or their representatives, shall be filed with the Engineer and the City Police Department prior to beginning work.

STANDARD SPECIFICATIONS
The Standard Specifications and Standard Plans of the City are contained in the Latest Edition of the Standard Specifications for Public Works Construction (SSPWC) and Standard Plans for Public Works Construction (SPPWC). Copies of these Standard Specifications and Plans are available from the publisher, Building News, Incorporated, 990 Park Center Drive, Suite E, Vista, CA 92081.

The City also uses the Standard Specifications and plans of the State of California Department of Transportation (Caltrans) which Standard Specifications and Plans are available from Caltrans District 7, Los Angeles or Caltrans Office in Sacramento.

The Standard Specifications set forth above will control the general provisions, construction materials, and construction methods for this contract except as amended by the Plans, Special Provisions, or other contract documents. The following Special Provisions are supplementary and in addition to the provisions of the Standard Specifications unless otherwise noted and the section numbers of the Special Provisions coincide with those of the said Standard Specifications. Only those sections requiring elaboration, amendment, specifying of options, or additions are called out.

Page 480 of 1292 ends

GP-1

SPECIAL PROVISIONS
FOR

PAVING THE WAY PROGRAM

MONTEBELLO BLVD
(FROM LOS ANGELES AVE TO LINCOLN BLVD)
C.P. No. 888

IN THE CITY OF MONTEBELLO

TABLE OF CONTENTS
PART 1 GENERAL PROVISIONS
(NOTE: Sections Correspond to 2021 of Standard Specifications)

SECTION PAGE
1 Terms, Definitions, Abbreviations And Symbols GP-4
2 Scope Of The Work GP-6
3 Control Of The Work GP-7
4 Control Of Materials GP-11
5 Legal Relations And Responsibilities GP-11
6 Prosecution And Progress Of The Work GP-17
7 Measurement And Payment GP-18
8 Facilities For Agency Personnel GP-26
9 City Standards, Standard Plans & Drawings GP-26
10 Claims And Protests GP-26
PART 2 BID ITEM DESCRIPTIONS

BID ITEMS PAGE
1 Project Information Signs SP-2
2 Traffic Control And Stage Construction SP-3
3 Provide Construction Survey SP-8
4 Remove Tree And Stump SP-10
5 Roadway Excavation SP-11
6 Remove Exist AC Pavement SP-11
7 Remove Exist Concrete Pavement SP-12
8 Remove Exist Concrete Sidewalk SP-12
9 Remove Exist Concrete Curb And Median Improvements SP-13 10 Remove Exist Curb Ramp SP-13
11 Remove Exist Driveway Approach SP-14
12 Remove Exist Cross Gutter SP-15

Page 481 of 1292 ends

GP-2
PART 2 BID ITEM DESCRIPTIONS (CONT.)

BID ITEMS
13 Remove And Dispose Of Pedestrian Push Button And Post SP-15 14 Remove Exist Curb And Gutter SP-15
15 Cold Mill Exist AC Pavement (2") SP-16
16 Construct 2" Conventional AC Overlay Type C2-PG 64-10 SP-17 17 Construct AC Pavement SP-17
18 Aggregate Base SP-21
19 Construct Concrete Curb And Gutter A2-8 Per SPPWC Std. Plan 120-2 SP-21 20 Construct 4" PCC Sidewalk Per SPPWC Std. Plans 113-2 SP-22 21 Construct Concrete Cross Gutter And Spandrel Per SPPWC Std. Plan 122-2 SP-23
22 Construct Driveway Approach Per SPPWC Std. Plan 110-2 Type A SP-23 23 Construct Concrete Curb A1-8 Per SPPWC Std. Plan 120-2 SP-21 24 Construct Concrete Curb Ramps Per SPPWC Std. Plan 111-5 (Case And Type Per Plan) SP-23
25 Install Detectable Warning Surface Per SPPWC Std Plan 111-5 SP-24 26 Adjust To Grade, Water Valve Can And Cover SP-25
27 Adjust To Grade, Storm Drain Manhole Rim And Cover SP-25 28 Adjust To Grade, Sanitary Sewer Manhole Rim And Cover SP-25 29 Furnish And Install Traffic Signal Loop Detectors And Connect DLC SP-26 30 Install Traffic Striping, Signing, Delineators SP-27 31 Install Service Equipment Enclosure, Type Iii-B Per Caltrans Std Plan ES-2E SP-28
32 Median Hardscape And Landscape Planting SP-30
33 Irrigation System SP-36
34 Plant Establishment And Maintenance Period (90 Days) SP-42 PART 4 Existing Improvements
(NOTE: Sections Correspond to 2021 Edition of Standard Specifications)

SECTION PAGE
400 Protection And Restoration SP-44
400-1 General SP-44
400-2 Permanent Survey Markers SP-45
400-3 Payment SP-45
402 Utilities SP-45
402-1 Location SP-47
PART 6 TEMPORARY TRAFFIC CONTROL
(NOTE: Sections Correspond to 2021 Editions of Standard Specifications)

SECTION PAGE
600 Access SP-48

Page 482 of 1292 ends

GP-3
600-1 General SP-48
600-2 Vehicular Access SP-48
600-3 Pedestrian Access SP-49
601 Temporary Traffic Control For Construction And Maintenance Work Zones SP-49
601-1 General SP-49
601-2 Temporary Traffic Control Plan (TCP) SP-49

Page 483 of 1292 ends

GP-4

SPECIAL PROVISIONS
PART 1 – GENERAL PROVISIONS
FOR

PAVING THE WAY PROGRAM

MONTEBELLO BLVD
(FROM LOS ANGELES AVE TO LINCOLN BLVD)
C.P. No. 888

IN THE CITY OF MONTEBELLO
The work required to be performed for the completion of the Project shall be performed in accordance with the Standard Specifications for Public Works Construction (SSPWC), latest Edition (hereinafter referred to as the "General Provisions"), in so far as the same applies to the Project, the Standard Plans and the Contract Documents.

For purposes of this Project, the following General Provisions are amended, as follows:

SECTION 1 – GENERAL
The following additions/modifications are hereby made to Subsection 1-2 of the Standard Specifications:
1-2 TERMS AND DEFINITIONS
AGENCY: City of Montebello
Board: City Council of the City of Montebello
Caltrans: State of California, Department of Transportation City: City of Montebello
County: County of Los Angeles
Engineer: The City Engineer of the City of Montebello or his authorized representative
Federal: United States of America
Contractor: The word Contractor means the Contractor as defined herein or his authorized representative.

Page 484 of 1292 ends

GP-5
1-7 AWARD AND EXECUTION OF CONTRACT
1-7.1 General
Subsection 1-7.1 of the Standard Specifications is hereby replaced with the following:

Within ten (10) working days after the date of the City’s notice of award, the Contractor shall execute and return the following contract documents to the City:
• Contract Agreement
• Faithful Performance Bond
• Material and Labor Bond
• Public Liability and Property Damage Insurance Certificate • Worker’s Compensation Insurance Certificate
• Project Schedule
Failure to comply with these requirements will constitute non-responsiveness on the part of the Contractor and will result in annulment of the award by the City and forfeiture of the Proposal Guarantee by the Contractor.

The Contract Agreement shall not be considered binding upon the City until executed by the authorized City official.

A corporation to which an award is made may be required, before the Contract Agreement is executed by the City, to furnish evidence of its corporate existence, of its right to enter into contracts in the State of California, and of the authority of its officers to sign contracts and bonds for the corporation.
1-7.2 Contract Bonds
The second sentence of the fourth paragraph of this subsection of the Standard Specifications for Public Works Construction (SSPWC) is hereby deleted and replaced with the following:

The Faithful Performance Bond shall remain in force until one (1) year of recordation of the Notice of Completion. The Material and Labor Bond shall remain in force until thirty-five days after the date of recordation of the Notice of Completion.

The second and third sentences of the third paragraph of Subsection 2-4 of the Standard Specifications for Public Works Construction (SSPWC) are hereby deleted and replaced with the following:

The “Payment Bond” (Material and Labor Bond) shall be for not less than 50 percent of the contract price, to satisfy claims of material suppliers and of mechanics and laborers employed by

Page 485 of 1292 ends

GP-6
it on the work. The Payment Bond shall remain in effect until thirty-five days after the date of recordation of the Notice of Completion.

SECTION 2 – SCOPE OF THE WORK
2-2 PERMITS
This subsection of the Standard Specifications is hereby replaced by the following:

Prior to the start of any work, the Contractor shall take out the applicable City permits and make arrangements for City inspections. The City will issue the permits at no charge to the Contractor.

The Contractor and all subcontractors shall each obtain a City business license, and shall be licensed in accordance with the State Business and Professions Code. The Contractor shall also obtain any and all other permits, licenses, inspections, certificates, or authorizations required by any governing body or entity.

The Contractor shall pay all costs incurred by the permit requirements. 2-5 CONTRACTOR’S EQUIPMENT AND FACILITIES
The following is hereby added to this subsection of the Standard Specifications:
2-5.5 A noise level limit of 86 dba at the distance of fifty feet shall apply to all construction equipment on or related to the job whether owned by the Contractor or not. The use of excessively loud warning signals shall be avoided except in those cases required for the protection of personnel. 2-5.6 All noise producing project equipment and vehicles using internal combustion engines shall be equipped with mufflers, and air inlet silencers where appropriate, in good operating condition that meet or exceed original factory specifications. Mobile or fixed “package” equipment (e.g. arc-welders, air compressors) shall be equipped with shrouds and noise control features that are readily available for that type of equipment. 2-5.7 All mobile or fixed noise producing equipment used on the project, which is regulated for noise output by a local, state, or federal agency, shall comply with such regulation while in the course of project activity.
2-5.8 Electrically powered equipment instead of pneumatic or internal combustion powered equipment shall be used, where feasible.
2-5.9 Material stockpiles and mobile equipment staging, parking, and maintenance areas shall be located as far as practical from residences.
2-5.10 The hours of conventional construction activities shall be restricted to the periods and days permitted by the local noise or other applicable ordinance. In accordance with the City of Montebello Noise Ordinance, these activities include (but are not limited to) construction, noisy maintenance activities, all spoils and material transport, demolition, and grading and are prohibited between the hours of 4:00 p.m. and 8:00 a.m. on weekdays (Monday through Friday), Saturday and Sundays, and legal holidays, except in cases of emergency as determined and approved in writing by the City Engineer.

Page 486 of 1292 ends

GP-7
2-5.11 The use of noise producing signals, including horns, whistles, alarms, and bells shall be for safety warning purposes only.
2-5.12 No project related public address, paging, two-way radio, or music system shall be audible at any adjacent residence.
2-5.13 The on-site construction supervisor shall have the responsibility and authority to receive and resolve noise complaints. An appeal process to the City shall be established prior to construction commencement that will allow for resolution of noise problems that cannot be immediately solved by the site supervisor.
2-5.14 The Contractor shall develop a project noise control plan, which shall be approved and implemented prior to commencement of any construction activity. 2-5.15 Noise control features and plans shall be reviewed and approved by a noise control engineering professional.
2-5.16 Contract incentives may be offered to the construction contractor to minimize or eliminate noise complaints resulting from project activities.
2-5.17 The erection of temporary sound wall barriers shall be considered where project activity is unavoidably close to residences.
2-5.18 Caltrans Standard Specifications (Sections 7 and 42) and Standard Special Provisions (that provide limits on construction noise levels) shall be applied and enforced by the City on the project Contractor.
2-5.19 Arrange noisiest operations together in the construction program to avoid continuing periods of annoyance.
2-5.20 If practical, implement project noise abatement features prior to construction SECTION 3 – CONTROL OF THE WORK
3-7 CONTRACT DOCUMENTS
3-7.1 General
The following is hereby added after the last paragraph of this subsection of the Standard Specifications:

The Contractor shall maintain a control set of Plans and Specifications on the project site at all times. All final locations determined in the field, and any deviations from the Plans and Specifications, shall be marked in red on this control set to show the as-built conditions. Upon completion of all work, the Contractor shall return the control set to the Engineer. Final payment will not be made until this requirement is met.

Page 487 of 1292 ends

GP-8
3-7.2 Precedence of The Contract Documents
This subsection of the Standard Specifications is hereby replaced by the following:

All of the CONTRACT DOCUMENTS shall be read as complimentary to one another and requiring the highest quality, highest quantity, and highest standard of performance for the Project for the City’s benefit. In the case of a direct conflict between any of the CONTRACT DOCUMENTS, the order of precedence of the CONTRACT DOCUMENTS shall be:

FIRST: Requirements of law, including the Charter and Ordinances of the City.

SECOND: Permits from other Agencies as may be required by law or Ordinance.

THIRD: Permits from City Departments as may be required by law or Ordinance.

FOURTH: Change Orders and/or Supplemental Agreements; whichever occurs last.

FIFTH: Contract/Agreement.

SIXTH: Addenda.

SEVENTH: Bid/Proposal.

EIGHTH: Special Provisions.

NINETH: Plans.

TENTH: Standard Plans.

ELEVENTH: Standard Specifications.

TWELFTH: Reference Specifications.

Detailed plans shall have precedence over general plans. 3-10 SURVEYING.
3-10.1 General.

This subsection of the Standard Specifications is hereby replaced by the following:

The Contractor shall provide construction survey for all the streets shown in the contract documents, including office research of notes, plats or other necessary documents; marking removal limits; grade staking; tying and relocating utilities. All work shall be done to the satisfaction of the Engineer.

Page 488 of 1292 ends

GP-9
The Contractor shall reset disturbed monuments and provide a Corner Record Survey filed with the County Surveyor and City Engineer. Corner Record Surveys shall be completed by a Land Surveyor licensed in the State of California to practice surveying. Prior to start of construction, Contractor shall visit the site and prepare a list of all centerline ties , monuments and survey markers, which may be damaged , or removed during construction and shall hire a CA licensed Land Surveyor to reset and re-establish the monuments, survey markers and ties at Contractor’s expense.

The Contractor shall furnish all construction surveying work for all paving work/ concrete work and the resetting of monuments, survey markers, and centerline ties.

The Contractor shall notify the City of Montebello, in advance, in the event that any monumentation or witnesses to the monumentation should fall within any removal area.

The Contractor shall be liable for a back charge in an amount up to $1,000.00 per point obliterated or destroyed without notice or authorization from the City of Montebello.

Any questionable grade, elevation, location or element of design shown on the plans shall be brought to the immediate attention of the Engineer in writing for clarification prior to construction.

The City reserves the right to verify all staking and monumentation for horizontal and vertical accuracy. The allowable error shall not exceed 0.02 feet vertically or horizontally. Any staking found to exceed allowable error shall be reset at the sole expense of the Contractor and no additional compensation will be made therefore. In cases where the Contractor is unable to place a monument, such as conflicts with underground utilities, the Contractor shall notify the Engineer for review, confirmation, and approval of the omission. All work described in this Section shall be done by or under the direction of a Professional Land Surveyor or a Registered Civil Engineer authorized to practice Land Surveying in the State of California herein referred to as “Surveyor”. 3-10.2 Line and Grade
The following is hereby added after the last paragraph of this subsection of the Standard Specifications:

The Contractor’s Surveyor shall have all the necessary tools, materials, personnel available at the job site for setting blue, yellow and red top hubs at the time that they are set, and shall adequately reference all such stakes by setting hubs three (3) inches below subsurface.

The Surveyor shall have the option of establishing line and grade either by setting stakes to finished grade, marking the cuts and fills on the pavement, or referring to stakes, spikes, drill holes, chisel cuts, etc., on a grade sheet. Normally, stakes will be set and stationed by the Surveyor for rough grade, curbs, headers, sewers, storm drains, and structures and a corresponding cut or fill to finished grade (or flow line) indicated on a grade sheet. If the Surveyor elects to set stakes to the finished grade, the top of these stakes will be colored with blue crayon or paint. All elevations will be established with a Surveyor’s level or Theodolite.

For street improvements, the Surveyor will establish rough grade elevations at 50-foot intervals along the street. After completion of the rough grading, he/she will establish elevations for curb

Page 489 of 1292 ends

GP-10
or pavement headers. An elevation for pavement will be established at all points indicated by elevations shown on the plans. Elevations will be established at 25-foot intervals on the centerline and at all grade changes. For resurfacing over existing pavement or constructing 2 or 3 course bituminous pavement, the Surveyor will paint data on the surface of the existing pavement and/or base course and each lift to indicate the fill to finished grade at such locations and intervals as to provide adequate control for laying the wearing surface course to finished grade.

Flow line elevations will be established by the Surveyor at all changes in grade and at 25-foot intervals when the grade is greater than 0.50% and at 10-foot intervals for grades of 0.50% or less.

For flow lines adjacent to curbs on grades 0.10% or over, when the curb is new and has a uniform curb face, flow line elevations will not be set on existing curbs, the grade of which may be irregular, grade points will be set at all changes in grade and at 25-foot intervals. Sufficient flow line elevations will be set to facilitate the construction of warped pavement sections or for special drainage conditions.

For integral curb and gutter, blue tops for the flow line will not be set but curb elevations shall be established at all changes in grade and at 25-foot intervals when the grade is more than 0.50% and at 10-foot intervals when the grade is 0.50% or less. In the case of integral curb and gutter with a varying curb face, grade sheets will show cuts and fills to the top of the curb or to the flow line and indicate the required curb face.

For storm drains, the Surveyor will establish elevations at 25-foot intervals along the main line, at all grade change points indicated on the plans, at inlets and outlets of structures and at the upper ends of house connections and laterals. Normally, elevations for narrow trenches will be established by means of offset stakes and a grade sheet giving cuts from such stakes will be issued.

When determined necessary, blue top hubs will be set in the trench for line and grade. Narrow trenches where there are space constraints due to utility conflicts must be approved by the Engineer and must compile with Slurry mix backfill according to Section 306-12.2 of the Greenbook. Use of slurry mix backfill shall include furnishing material, labor, tools, equipment and incidentals, and for doing all work involved in installing slurry mix backfill, as specified in the Standard Specifications, these Special Provisions, and as directed by the Engineer; and included in the cost for storm drain pipeline. No additional compensation shall be allowed.

Distances and measurements, except elevations and structural dimensions, are given and made on horizontal planes.

Copies of all grade sheets shall be provided to the Engineer for filing.

The following is added to this subsection of the Standard Specifications:
3-10.3 Permanent Survey Markers
The Contractor shall reset disturbed monuments and provide a Corner Record Survey filed with the County Surveyor and City Engineer. Corner Record Surveys shall be completed by a Land Surveyor licensed in the State of California to practice surveying. 3-10.4 Surveying Services
This subsection of the Standard Specifications is hereby deleted and replaced with the following:

Page 490 of 1292 ends

GP-11
The Contractor will furnish a Surveyor as needed for layout of the work and the resetting of monuments.

SECTION 4 - CONTROL OF MATERIALS
4-1 GENERAL
The following is hereby added after the last paragraph of this subsection of the Standard Specifications:

The Contractor and all subcontractors, suppliers, and vendors, shall guarantee that the entire work will meet all requirements of this contract as to the quality of materials, equipment, and workmanship. The Contractor, at no cost to the City, shall make any repairs or replacements made necessary by defects in materials, equipment, or workmanship that become evident within one (1) years after the date of recordation of the Notice of Completion. Within this one-year period, the Contractor shall also restore to full compliance with requirements of this contract any portion of the work which is found to not meet those requirements. The Contractor shall hold the City harmless from claims of any kind arising from damages due to said defects or noncompliance. The Contractor shall make all repairs, replacements, and restorations within thirty (30) days after the date of the City Engineer’s written notice.
4-6 TRADE NAMES OR EQUALS
The first and second paragraphs of this subsection of the Standard Specifications are hereby replaced with the following:

Although the bidder may believe that by use of a different material than that specified on/in the plans and specifications, a lower cost project/bid may result. The bidder is to bid the project on the basis of using the material(s) as named keeping in mind that all materials named herein by manufacturer is not to prohibit the bidder considering using in his bid what he consider to be an equal material except where the City has designated a sole product. Once the bids have been opened the successful Contractor may discuss with the City the use of another product; which may result in a determination by the City that the other product is equal and possibly that by the City allowing the use of the Contractor proposed equal that a change in the contract amount may result.

SECTION 5 – LEGAL RELATIONS AND RESPONSIBILITIES
5-3 LABOR
5-3.2 Prevailing Wages
The following is hereby added to this subsection of the Standard Specifications:

The Contractor, and all subcontractors, suppliers and vendors, shall comply with all City, State and Federal orders regarding affirmative action to ensure equal employment opportunities and fair employment practices. Failure to file any report due under said orders will result in suspension of periodic progress payments. The Contractor shall ensure unlimited access to the job site for all equal employment opportunity compliance officers. In accordance with the labor Code, as provided in Section 1773 et seq., the City has on file in the City Clerk’s office the latest prevailing

Page 491 of 1292 ends

GP-12
rates as established by the Director of Industrial Relations of the State of California. The Contractor shall not pay less than these rates.

The following subsection(s) are hereby added to Section 5-3 of the Standard Specifications 5-3.6 Laws
The Contractor, and all subcontractors, suppliers and vendors, shall comply with all City, State and Federal orders regarding affirmative action to ensure equal employment opportunities and fair employment practices. Failure to file any report due under said orders will result in suspension of periodic progress payments. The Contractor shall ensure unlimited access to the job site for all equal employment opportunity compliance officers. In accordance with the labor Code, as provided in Section 1773 et seq., the City has on file in the City Clerk’s office the latest prevailing rates as established by the Director of Industrial Relations of the State of California. The Contractor shall not pay less than these rates.
5-4 INSURANCE
5-4.2 General Liability Insurance
This subsection of the Standard Specifications is hereby replaced by the following:

CONTRACTOR shall carry and maintain Comprehensive General Liability Insurance which provides the following:
• Minimum coverage: Bodily injury limits of $2,000,000 for each person and $2,000,000 for each occurrence; property damage limits of $2,000,000 for each occurrence, $5,000,000 aggregate.
• Products/Completed Operations Hazard Insurance: in an amount of not less than FIVE MILLION DOLLARS ($5,000,000).
• A combined single limit policy with aggregate limits in an amount of not less than Five MILLION DOLLARS ($5,000,000) shall be considered equivalent to the said required minimum limits set forth herein above.

If a Commercial General Liability Insurance form or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to the work to be performed under this Contract or the general aggregate limit shall be at least twice the required occurrence limit.

Such coverage shall include but shall not be limited to, protection against claims arising from bodily and personal injury, including death resulting therefrom, and damage to property resulting from activities contemplated under this Contract, including the use of owned and non-owned real property and automobiles. Insurance coverage shall not be subject to any type of pollution exclusion or owned property exclusions.
5-4.3. Worker's Compensation Insurance
The following is hereby added to this subsection of the Standard Specification:

Page 492 of 1292 ends

GP-13
CONTRACTOR shall carry and maintain worker’s compensation in the amount of $1,000,000 as required by the California Labor Code for all persons employed directly or indirectly in connection with this Contract by CONTRACTOR. To the extent that CONTRACTOR utilizes any subcontractor for the performance of any part of the work under this Contract, CONTRACTOR shall require and assure that such subcontractor also carry and maintain worker’s compensation as required by the California Labor Code for all persons directly or indirectly in connection with this Contract.
5-4.4 Auto Liability Insurance
This subsection of the Standard Specifications is hereby replaced by the following CONTRACTOR shall carry and maintain Automobile Liability Insurance which provides a minimum coverage of at least $5,000,000 per accident for bodily injury and property damage.

The following subsection(s) are hereby added to Section 5-4 of the Standard Specifications 5-4.5 Additional Insureds
The CITY, its officers, agents and employees must be named as additional insureds or as additional loss payees in all insurance policies required by this Contract. An endorsement to this effect shall be delivered to CITY prior to the commencement of any work. Satisfaction of any deductible requirement shall be the responsibility of CONTRACTOR. Such insurance shall be primary and noncontributory with any other insurance maintained by the CITY. 5-4.6 Notice of Cancellation
CONTRACTOR agrees to oblige its insurance agent or broker and insures to provide CITY with a thirty (30) day notice of cancellation (except for nonpayment for which a ten (10) day notice is required) or nonrenewal of coverage for each required coverage. 5-4.7 Severability Clause
Each of the policies of insurance shall contain a clause substantially as follows:

The insurance afforded by this policy applies separately to each insured against whom a claim or suit is made, or suit is brought, except with respect to the limit of the insurer's liability.
5-4.8 Qualifications of Insurer
All policies of insurance shall be issued by an insurance company acceptable to CITY and authorized to issue said policy in the State of California. 5-4.9 Approval of Insurer
The insurance carrier providing the insurance shall be chosen by CONTRACTOR subject to approval by CITY, provided that such approval shall not be unreasonably withheld.

Page 493 of 1292 ends

GP-14
5-4.10 Payment of Premiums
All premiums on insurance policies shall be paid by CONTRACTOR making payment, when due, directly to the insurance carrier, or in a manner agreed to by CITY. 5-4.11 Evidence of Insurance and Claims
CONTRACTOR shall provide certificates of insurance to CITY as evidence of insurance coverage required herein, along with a waiver of subrogation endorsement for workers’ compensation. The CITY’s Risk Manager must approve insurance certificates and endorsements prior to commencement of performance. Current certification of insurance shall be kept on file with the CITY at all times during the term of this Contract. The CITY reserves the right to require complete, certified copies of all required insurance policies, at any time. 5-7 SAFETY
5-7.1 Work Site Safety
5-7.1.1 General
The following is hereby added to this subsection of the Standard Specifications:

It is part of the service required of the Contractor to make whatever provisions are necessary to protect the public. The Contractor shall use foresight and shall take such steps and precautions as its operations warrant to protect the public from danger, loss of life or loss of property, which would result from interruption or contamination of public water supply, interruption of other public services, or from the failure of partly completed work or partially removed facilities. Unusual conditions may arise on the work, which will require that immediate and unusual provisions be made to protect the public from danger or loss, or damage to life and property, due directly or indirectly to prosecution of work under this contract.

Whenever, in the opinion of the Engineer, an emergency exists against which the Contractor has not taken sufficient precaution for the public safety, protection of utilities and protection of adjacent structures or property, which may be damaged by the Contractor’s operations and when, in the opinion of the Engineer, immediate action shall be considered necessary in order to protect the public or property due to the Contractor’s operations under this contract, the Engineer will order the Contractor to provide a remedy for the unsafe condition. If the Contractor fails to act on the situation within a reasonable time period, the Engineer may provide suitable protection to said interests by causing such work to be done and material to be furnished as, in the opinion of the Engineer may seem reasonable and necessary.

The cost and expense of said labor and material, together with the cost and expense of such repairs as are deemed necessary, shall be borne by the Contractor. All expenses incurred by the City for emergency repairs will be deducted from the progress payments and the final payment due to the Contractor. However, if the City does not take such remedial measures, the Contractor is not relieved of the full responsibility for public safety.

The following subsection(s) are hereby added to Section 5-7 of the Standard Specifications:

Page 494 of 1292 ends

GP-15
5-7.9 Traffic and Access.

The Contractor shall notify the occupants of all affected properties in writing at least forty-eight (48) hours (2 working days) prior to any temporary obstruction of access. Contractor to revise all dates daily on no-parking signs. If works does not begin on the date posted on the no-parking sign, Contractor then shall replace all signs with the new correct dates. Vehicular access to the property line shall be maintained except as required for construction for a reasonable period of time. No overnight closure of any driveway will be allowed except as permitted by the Engineer.

At least one twelve-foot-wide traffic lane shall be provided for each direction of travel on all streets at all times except as permitted by the Engineer. The Contractor must submit a traffic control plan to the City and obtain approval of same in writing from the City Engineer. The Contractor shall maintain at least one lane of traffic in each direction at all times during construction. The plan shall be prepared per latest edition of California Manual on Traffic Control Devices (CA-MUTCD).

There are some driveways that require replacement in order to be handicap compliant. Where a property has two driveways, only one driveway at a time can be closed for replacement. Where a single driveway to a property has a considerable width, half of the driveway is to be closed, worked on and reopened for usage before the other half of the driveway can be worked on.

All driveways have to be open for access during project non-construction hours and days which may require use of plating and other devices or methods.

No driveway can be worked on until the owner/tenant has been informed in writing with five (5) working days’ notice of the scheduled work and has agreed to the planned schedule of the Contractor.

Under situations of driveway closure to pedestrians, the Contractor shall post advance notice on barricades to direct pedestrian to use the sidewalk on the opposite side of the street or the Contractor may elect to provide continuous K-rail in the curb lane to allow pedestrians to walk in the curb lane behind the K-rail. Any and all devices such as plates, barricades, K-rails and notices shall be continuously maintained for pedestrian and vehicle safety. No curb lanes shall be closed during non-working days of the week. Appropriate advance warning signs shall be continuously maintained as needed during the project. All such devices, warning signs and interruptions of normal vehicle lanes, parking lanes and pedestrian walkways shall be shown on the Traffic Control Plan for advance approval by the City.

Clearances from traffic lanes shall be five feet to the edge of any excavation and two feet to the face of any curb, pole, barricade, delineator, or other vertical obstruction.

Clearances from traffic lanes shall be five feet to the edge of any excavation and two feet to the face of any curb, pole, barricade, delineator, or other vertical obstruction.

Any striped roadway shall be delineated by the Contractor with temporary raised reflective markers when it is to be left un-striped overnight.

Page 495 of 1292 ends

GP-16
5-7.9.1 Street Closures, Detours, Barricades.

This subsection is hereby added to section 5-7.9 of the Standard Specifications:

Street closures will not be allowed except as specifically permitted by the Engineer.

At the Pre-Construction meeting, the Contractor shall submit to the Engineer a detailed written plan for traffic control and construction sequencing for the project. The plan shall include drawings as necessary to clearly outline how traffic flow and pedestrian walkways will be handled during the course of construction and where detour and advance notice signs will be posted.

Traffic lane transitions shall not be sharper than a taper of thirty to one.

Temporary traffic channelization shall be accomplished with barricades, K-rail sections or delineators. Temporary striping will not be allowed unless specifically permitted by the Engineer.

The Contractor shall prepare any plans that may be required for temporary striping to the satisfaction of the Engineer. In no event will temporary striping be allowed to remain on finish pavement surfaces.

In no case shall traffic be diverted from the existing traveled way without prior approval of the City Engineer.

The contractor shall include in his Traffic Control Plan use of lighted message boards to notify traffic of project and any changes in vehicle or pedestrian travel routes.

If the Contractor shall fail to provide and install any of the signs or traffic control devices ordered by the Engineer, the Engineer may either stop the work or cause such signs or traffic control devices to be placed by others and charge the cost therefor against the Contractor, and deduct same from the next progress payment
5-7.9.2 Protection of the Public.

This subsection is hereby added to section 5-7.9 of the Standard Specifications:

It is part of the service required of the Contractor to make whatever provisions are necessary to protect the public. The Contractor shall use foresight and shall take such steps and precautions as its operations warrant to protect the public from danger, loss of life or loss of property, which would result from interruption or contamination of public water supply, interruption of other public services, or from the failure of partly completed work or partially removed facilities. Unusual conditions may arise on the work, which will require that immediate and unusual provisions be made to protect the public from danger or loss, or damage to life and property, due directly or indirectly to prosecution of work under this contract.

Whenever, in the opinion of the Engineer, an emergency exists against which the Contractor has not taken sufficient precaution for the public safety, protection of utilities and protection of adjacent structures or property, which may be damaged by the Contractor’s operations and when, in the opinion of the Engineer, immediate action shall be considered necessary in order to protect the public or property due to the Contractor’s operations under this contract, the Engineer will

Page 496 of 1292 ends

GP-17
order the Contractor to provide a remedy for the unsafe condition. If the Contractor fails to act on the situation within a reasonable time period, the Engineer may provide suitable protection to said interests by causing such work to be done and material to be furnished as, in the opinion of the Engineer may seem reasonable and necessary.

The cost and expense of said labor and material, together with the cost and expense of such repairs as are deemed necessary, shall be borne by the Contractor. All expenses incurred by the City for emergency repairs will be deducted from the progress payments and the final payment due to the Contractor. However, if the City does not take such remedial measures, the Contractor is not relieved of the full responsibility for public safety.

SECTION 6 – PROSECUTION AND PROGRESS OF THE WORK
6-1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF WORK.

The following is hereby added to this subsection of the Standard Specifications:

The Contractor’s proposed Construction Schedule shall be submitted to the Engineer within ten working days after the date of the City’s execution of the Contract Agreement. The schedule shall be supported by written statements from each supplier of materials or equipment indicating that all orders have been placed and acknowledged and setting forth the dates that each item will be delivered.

Prior to issuing the Notice to Proceed, the Engineer will schedule a preconstruction meeting with the Contractor to review the proposed Construction Schedule and delivery dates, arrange utility coordination a non-pay item, discuss construction methods, and clarify inspection procedures.

The Contractor shall submit periodic Progress Reports to the Engineer by the last day of each month. The Report shall include an updated Construction Schedule. Any deviations from the original schedule shall be explained. Progress payments will be withheld pending receipt of any outstanding reports.
6-3 TIME OF COMPLETION.
6-3.1 General.

This subsection of the Standard Specifications is hereby replaced by the following:

All construction work is to be completed within one hundred sixty (160) working days. 6-3.2 Contract Time Accounting.

The following is hereby added to this subsection of the Standard Specifications:

The Contractor’s activities shall be confined to the hours between 7:00 a.m. and 3:30 p.m., Monday through Friday, excluding holidays, for daytime work and to the hours between 8:00 p.m. starting Monday and 5:00 a.m. ending Saturday, excluding holidays, for nighttime work. Deviation from these hours will not be permitted without the prior consent of the Engineer, except in emergencies involving immediate hazard to persons or property. In the event of either a requested or emergency deviation, inspection service fees will be charged against the Contractor. The service fees will be

Page 497 of 1292 ends

GP-18
calculated at overtime rates including benefits, overhead, and travel time. The service fees will be deducted from any amounts due the Contractor. Should the Contractor choose nighttime work, any and all lighting and traffic control, as needed, shall be provided by the Contractor. 6-9 LIQUIDATED DAMAGES
The liquidated damages value mentioned in this section is hereby amended to be $500.00 per day.

SECTION 7 – MEASUREMENT AND PAYMENT
7-3 PAYMENT
7-3.2 Partial and Final Payment.

This subsection of the Standard Specifications is hereby replaced by the following:

The closure date for the purpose of making partial progress payments will be on or about the twenty-fifth (25th) day of each month. The Contractor shall prepare the approximate measurement of the work performed through the closure date and submit it to the City for approval along with an updated construction schedule.

When the work is complete, the Engineer will determine the final quantities of the work performed and prepare the final progress payment.

Payments are commonly authorized and made within forty-five days following the last day of the month submitted. However, payments will be withheld pending receipt of any outstanding reports required by the contract documents. In addition, the final progress payment will not be released until the Contractor returns the control set of Plans and Specifications showing the as-built conditions and any other required documents.

A full five percent (5%) retention will be deducted from all progress payments. The final retention will be authorized for final payment forty-five (45) days after the date of recordation of the Notice of Completion.

The Contractor, however, may receive interest on the retention for the length of construction, or receive the retention itself as long as the retention is substituted with escrow holder surety of equal value.

At the request and expense of the Contractor, surety equivalent to the retention may be deposited with the State Treasurer or a State or Federally chartered bank as the escrow agent, who shall pay such surety to the Contractor upon satisfactory completion of the contract.

Sureties eligible for investment shall include those listed in Section 16430 of the State Government Code or bank or savings and loan certificates of deposit.

Any escrow agreement entered into shall contain the following provisions:
a) The amount of surety to be deposited;
b) The terms and conditions of conversion to cash in case of default of the Contractor; and

Page 498 of 1292 ends

GP-19
c) The termination of the escrow upon completion of the contract.

Decisions to Withhold Progress Payments
The Engineer may withhold or nullify the requested Progress Payments in whole or in part due to the Contractor to such extent as may be necessary to protect the City from loss as a result of because of any of the circumstances listed below:

1. Defective work not remedied in accordance with provisions of the Contract Documents;

2. Third party claims, liens or stop notices filed or reasonable evidence indicating probable filing of such claims, liens or stop notices;

3. Failure of the Contractor to make payments properly for labor, services, materials, equipment, or other facilities or to subcontractor;

4. A reasonable doubt that the work can be completed for the unpaid balance of the Contract Sum;

5. A reasonable doubt that the Contractor will complete the work within the agreed Contract Time;

6. Costs to the Owner resulting from failure of the Contractor to complete the work within the stipulated time, or in accordance with the terms of the contract;

7. Damage to other work or property;

8. Failure to fulfill all the requirements of the Contract Documents;

9. When there is pending litigation against the City related to this contract or reasonable anticipation thereof;

10. Failure of the contractor to maintain all records as required; to submit progress schedules, weekly payroll records, minority enterprise utilization reports and forms and any other such item required by these specifications;

11. Failure to pay laborers and mechanics employed by the contractor or any subcontractor on the work the full amount of wages required by this contract, after written notice to the contractor.

12. Failure of Contractor of the subcontractors to comply with applicable laws;

13. Any reason specified elsewhere in the Contract Documents as grounds for a withholding, offset or setoff or that would legally entitle City to a setoff or recoupment;

14. Additional professional, consultant or inspection services required due to Contractor’s failure to comply with Contract Documents;

15. Liquidated damages payable to City;

Page 499 of 1292 ends

GP-20

16. Materials ordered or paid by City on behalf of Contractor;

17. Damage loss caused to City, a separate contractor, homeowner contractor or any other person or entity due to the actions of the Contractor;

18. Cleanup performed by City and chargeable to Contractor;

19. Failure of Contractor to pay contributions due and owing to employee benefits funds pursuant to applicable collective bargaining agreements or trust agreements;

20. Failure of Contractor or any Subcontractor to properly pay prevailing wages as defined in California Labor Code Section 1720 et/ seq.;

21. A breach by Contractor of any obligation or provision of the Contract Documents.

22. Whenever the City shall, in accordance herewith, withhold any monies otherwise due the Contractor, written notice of the amount withheld and the reasons therefore shall be given the Contractor, and, when the Contractor shall remove the grounds for such withholding, the City will pay to the Contractor, within 35 calendar days, the amount so withheld.

Application of Withholding
Sums properly withheld in good faith may be used by City without a prior judicial determination of City’s actual rights with respect to recovery of any Loss on which such withholding is based.

Contractor agrees and hereby designates City as its agent in for such purposes, and agrees that such payments shall be considered as payments made under the Construction Contract by City to Contractor. City shall submit to Contractor accounting of such funds disbursed on behalf of Contractor. As an alternative to such payment, City may, in its sole discretion, elect to exercise its rights to adjust the Contract Sum.

Payment by City
After an Application for Progress Payment has been made, the City shall make payment in a timely manner unless there is a good faith reason for withholding the payments in accordance with the provisions of the Contract Documents or Applicable Law.

Payment to Subcontractors
Upon receipt of payment from City, Contractor shall pay the Subcontractors performing the Work, out of the amount paid to Contractor on account of such Subcontractor’s portion of the work, the amount of which said Subcontractor is entitled in accordance with the terms of its contract with Contractor and Applicable Laws, including, without limitation, California Public Contract Code Section 7107. Contractor shall remain responsible, notwithstanding a withholding by City pursuant to the terms of these General Conditions, to promptly satisfy from its own funds sums due to all Subcontractors who have performed the Work that is included in Contractor’s Application for Payment. Contractor shall, by appropriate agreement, require each Subcontractor to make payments to its sub-contractors and suppliers in similar manner. City shall have no obligation to pay or be responsible in any way for payments to Subcontractors, of any Tier.

Page 500 of 1292 ends

GP-21
Direct Negotiation of Stop Notices
City shall have the right to directly discuss, negotiate, settle or pay, without notice to or participation by Contractor, any stop notice claims asserted by the Subcontractors, of any Tier, and to deduct such sums paid from sums due to Contractor.

Release of Stop Notices
Except to the extent of any payments that City fails to make to Contractor under circumstances that constitute a breach by City of its payment obligations under the Contract Documents, if any stop notice, whether invalid or valid, is made, filed with, served upon or asserted against City or a Homeowner by any of the Subcontractors, of any Tier, or their agent or employee, for money claimed due for Work of any kind provided, then Contractor shall within five (5) Days after written notice by City and at Contractor’s Own Expense, procure, furnish and record appropriate releases or other instruments which under Applicable Laws will full release, extinguish and removed such stop notice. Unless and until such stop notice is fully released as afore-stated, City shall have the right to retain from any payments then due, or thereafter to become due, an amount equal to one hundred and fifty percent (150%) of the amount necessary to satisfy, discharge and defend against any such stop notice and any action or proceeding thereon which may be brought to judgment or award. If the amount to be paid, or the amount retained thereon, is insufficient to satisfy, discharge or defend against such stop notice and any action of proceeding thereon, then Contractor shall be liable for the difference and upon written demand shall immediately deposit the same with City.

The provisions in this paragraph are in addition to such other rights as City may have against Contractor under the Contract Documents or Applicable Laws.

Failure of Payment by City
If, through no fault of Contractor or failure by Contractor to comply with its obligations under the Contract Documents, Payment is not issued within thirty (30) Days after receipt of an undisputed and properly prepared and submitted Application for Payment then Contractor may, upon fourteen (14) additional Days’ written notice to City, stop the Project Work for which such Application for Payment is received until payment is received as to any undisputed and owing work. Any resulting Delay associated with the shut down and start-up of the Project Work as a result of Contractor’s proper exercise of its rights under this paragraph shall constitute a Compensable Delay.

Disputed Payments, Continuous Work
No dispute or disagreement with respect to the amount of any payment claimed due by Contractor shall relieve or excuse Contractor from the obligation to proceed with and maintain continuous, expeditious and uninterrupted performance of the Work.

Completion. Inspection. Punch List. Re-Inspection
A Contractor-generated punch list must be provided to the City or its representative prior to the request for final inspection. It will be the discretion of the City or its representative to grant the final inspection based on the Contractor generated punch list. Contractor shall achieve Completion of the Project Work in accordance with the requirements of the Contract Time and other provisions

Page 501 of 1292 ends

GP-22
of the Contract Documents. Contractor shall notify Engineer when Contractor believes that the Project Work for is Complete.

Unless the Engineer determines that the Project Work is not sufficiently complete to warrant an inspection to determine Compliance, the Engineer, accompanied by the Inspector of Record and any others deemed appropriate by the Engineer, will inspect the Project Work performed.

Contractor, along with such Subcontractors and others as Engineer deems necessary shall participate in the inspection. If the Project Work is found to be Complete, then Engineer shall proceed to issue a written completion notice as provided hereinafter.

Any items necessary for Compliance that are found missing, incomplete or requiring correction shall be summarized by Contractor in a Completion Punch List and promptly signed by Contractor and delivered to Engineer. Contractor shall proceed within forty-eight (48) hours after signing the Completion Punch List to commence correction and completion of the items listed.

Contractor shall notify Engineer when the items listed are completed at which time a re-inspection shall be scheduled in the same manner as the original inspection. If said inspection discloses any item, whether or not included on the original Punch List, which is found missing, incomplete, or requiring correction said item shall be corrected before a Notice of Completion shall be issued.

The City shall be reimbursed or at its option shall withhold from Contractor’s payments, amounts incurred by City to conduct more than two (2) inspections to determine Compliance of the Project Work. A Notice of Completion shall be issued by the Engineer when he determines that Compliance of the Project Work has occurred.

Final Completion
Contractor shall expeditiously and diligently perform all items of Project Work on the Final Completion Punch List so as to achieve Final Completion of the Project Work within the requirements of the Contract Time for Final Completion of the Project Work. Contractor shall forward to Engineer a written notice when Contractor believes that it has completed all of the items on the Final Completion Punch List and is read for a Final Completion Inspection. Unless Engineer determines that the Project Work is not sufficiently complete to warrant an inspection to determine Final Completion, Engineer, accompanied by Inspector of Record and any others deemed appropriate by Engineer, will inspect Project Work performed. If the Project Work is found to be Finally Complete, then Engineer shall proceed to issue a Notice of Final Completion as provided hereinafter.

If said inspection discloses any item, whether or not included on the Final Completion Punch List, which is found missing, incomplete, or requiring correction said item shall be corrected before a Notice of Final Completion shall be issued. The City shall be reimbursed or at its option shall withhold from Contractor’s payments, amounts incurred by City to conduct more than two (2) inspections to determine Final Compliance of the Project Work for any Home. A Notice of Final Completion shall be issued by the Engineer when he determines that Final Compliance of the Project Work has occurred.

Page 502 of 1292 ends

GP-23
Concluding Payment
Upon issuance by Engineer of the Notice of Final Completion for the Project Work Contractor shall submit to Engineer its Application for Payment requesting payment for completion. Without limitations to any other conditions to payment set forth elsewhere in the Contract Documents, the following shall be conditions precedent to a proper submission, and to Engineer’s approval, of Contractor’s Application for Final Payment:

1. Submission of an affidavit that payrolls, bills for materials and equipment, and other indebtedness connected with the Project Work for which City or City’s or Homeowner’s property or funds might be liable have been paid or otherwise satisfied;

2. Submission of consent of Surety, if any, to Completion Payment;

3. Submission of a certificate evidencing that the insurance required by the Contract Documents is in force;

4. Submission of conditional releases and waivers of stop notice and bond rights upon final payment in the form required by California Code Section 3262(d)(3) executed by Contractor and by all Subcontractors, of every Tier, performing any portion of the Project Work;

5. Submission of all Close-Out Documents for the Project Work;

6. Submission of adequate and complete certified payroll records as required by the Contract Documents for any time period that Project Work was performed, which have not been submitted by Contractor in connection with its previous Applications for Payments.

7. Proper payment of prevailing wages as defined in California Labor Code Section 1720, et seq for the Project Work.

8. Submission of certificates by Contractor and each Subcontractor, as required by any applicable collective bargaining agreement or trust agreement or Applicable Laws, certifying that all employees’ benefits relating to the Project Work due and owing having been paid in full; and

9. Submission of any other documents or information required by the Contract Documents as a condition of Final Payment or Final Completion of the Project Work.

Final Payment Terminates Liability
No claim shall be made or be filed, and neither the City nor any of its officers or agents shall be liable or held to pay any money, except as specifically provided in the Contract Documents.

The acceptance by the Contractor of the final payment aforesaid shall operate as, and shall be, a release to the City and its agents, from all claim and liability to the Contractor for anything done or furnished for, or relating to, the work or for any act or neglect of the City or of any person relating to or affecting the work, except the claim against the City for the remainder, if any there be, of the amounts kept or retained as provided elsewhere in these General Conditions.

Page 503 of 1292 ends

GP-24
Securities in Lieu of Retention
Provisions of California Public Contract Code Section 22300 et. seq. substitution of eligible and equivalent securities for retention held by City to ensure Contractors performance under the Contract will be permitted at the request and expense of the Contractor and in conformity with California Section 22300. The foregoing notwithstanding, the Contractor shall have ten (10) days following action by the City to award the Agreement to the Contractor to submit its written request to the City to permit the substitution of securities for retention under California Public Contract Code Section 22300. The failure of such Contractor to make such a written request for the City within said ten (10) day period shall be deemed a waiver of the Contractor’s right under California Public Contract Code Section 22300.

In the event the Contractor wishes to choose to exercise its rights under California Public Contract Code Section 22300, the Contractor shall enter into an escrow agreement with the City, and the escrow agent, a state or federally chartered bank in California with a current A.M. Best Rating of not less than “A,” in the form specified by said Section 22300. Contractor shall have the obligation of ensuring that such securities deposited are sufficient to maintain it total fair market value an amount equal to the cash amount of the sums to be withheld under the Agreement. If upon written notice from the City or from the appropriate escrow agent, indicating that the fair market value of the securities has dropped below the dollar amount of monies to be withheld by the City to ensure performance, Contractor shall, within five (5) days of the date of such notice, post additional securities as necessary to ensure that the total fair market value of all such securities held by the City, or in escrow, is equivalent to the amount of money to be withheld by the City under the Agreement.

Any escrow agreement entered into shall contain the following provisions:
(a) The amount of surety to be deposited;
(b) The terms and conditions of conversion to cash in case of default of the Contractor; and
(c) The termination of the escrow upon completion of the contract.

7.3.3 Delivered Materials
This subsection of the Standard Specifications is hereby replaced by the following:

Materials and equipment delivered but not incorporated into the work will not be included in the estimate for partial progress payment.
7-3.5 Contract Unit Prices
7-3.5.1 General
This subsection of the Standard Specifications is hereby replaced by the following:

If the Engineer orders a change in quantity of an item of Work, and the change does not involve a substantial change in character of the Work from that shown in the Plans or Specifications, the

Page 504 of 1292 ends

GP-25
City will adjust the total payment to be made for the item of Work by multiplying the amount authorized and installed by the Contract Unit Price. This amount may be greater or less than the amount shown in the Bid.

If the total quantity of a Major Bid Item is changed, only changes within 25% of the quantity shown in the Bid, either more or less, will be adjusted at the Contract Unit Price. 7-3.5.2 Increases of More than 25 Percent
This subsection of the Standard Specifications is hereby replaced by the following:

No adjustments for any unit bid price for any quantity that will vary by more than 25% will be allowed.
7-3.5.3 Decreases of More than 25 Percent
This subsection of the Standard Specifications is hereby replaced by the following:

No adjustments for any unit bid price for any quantity that will vary by more than 25% will be allowed.

7.4 PAYMENT FOR EXTRA WORK
7-4.3 Markup
7-4.3.1 Work by the Contractor
The following is hereby added to this subsection of the Standard Specifications:

The following percentages shall be added to the Contractor's costs and shall constitute the markup for all overhead and profit:

Labor 20%
Materials 15%
Equipment Rentals 15%
Other Contractor's costs 15%
One percent (1%) may also be added to the sum of costs and markups as compensation for the Contractor's bond premium.
7-4.3.2 Work by the Subcontractor
The following is hereby added to this subsection of the Standard Specifications:

When a subcontractor performs all or any part of the extra work, the markups in paragraph (a) shall be added to the subcontractor's actual cost of such work. The Contractor may add an additional markup of 10% of the first $5,000 of the subcontracted portion of the extra work and 5% on work added in excess of $5,000 of the subcontracted portion of work.

Page 505 of 1292 ends

GP-26
SECTION 8 – FACILITIES FOR AGENCY (CITY) PERSONNEL
Replace this section of the Standard Specifications with the following:

No field offices for City personnel will be required, however, the City personnel shall have the right to enter upon the project at all times and shall be admitted to the offices of the Contractor for the project in the City if so, provided by the Contractor for his own personnel.

SECTION 9 – CITY STANDARDS, STANDARD PLANS AND DRAWINGS Section 9 is hereby added to the Standard Specifications as follows:

All public improvements, construction and dedications required and described in this manual shall conform to the standards and specifications of the City. Standards, Standard Plans and Drawings of the following agencies are used by the City of Montebello and are part of the City’s standards.

Where there is ambiguity or conflict between standards over which standard shall apply, the City Engineer shall determine what shall apply, and his determination shall be final. All construction is subject to the approval of the City Engineer.

Standard Plans – Standard Plans for Public Works Construction, SPPWC, “Latest Edition and Supplement”.

Los Angeles County Public Works Department – Grey Book and all plans except those modified or replaced by City Standards.

Sanitation Districts of Los Angeles County - Applicable sewer and manholes.

State of California – California Department of Transportation (Caltrans) Standard Specifications and Standard Plans - Pavement markings and traffic loops.

City Standards - All applicable standard plans.

Standard Specifications - The 2021 edition of, and applicable amendments to, the “Standard Specifications for Public Works Construction (SSPWC).”
California Manual on Traffic Control Devices (CA-MUTCD), “Latest Edition”.

SECTION 10 – CLAIMS AND PROTESTS
Section 10 is hereby added to the Standard Specifications as follows:

Excerpts from the Public Contract Code 9204:
(a) The Legislature finds and declares that it is in the best interests of the state and its citizens to ensure that all construction business performed on a public works project in the state that is complete and not in dispute is paid in full and in a timely manner. (b) Notwithstanding any other law, including, but not limited to, Article 7.1 (commencing with Section 10240) of Chapter 1 of Part 2, Chapter 10 (commencing with Section 19100) of Part 2,

Page 506 of 1292 ends

GP-27
and Article 1.5 (commencing with Section 20104) of Chapter 1 of Part 3, this section shall apply to any claim by a contractor in connection with a public works project. (c) For purposes of this section:
(1) “Claim” means a separate demand by a contractor sent by registered mail or certified mail with return receipt requested, for one or more of the following:
(A) A time extension, including, without limitation, for relief from damages or penalties for delay assessed by a public entity under a contract for a public works project. (B) Payment by the public entity of money or damages arising from work done by, or on behalf of, the contractor pursuant to the contract for a public works project and payment for which is not otherwise expressly provided or to which the claimant is not otherwise entitled. (C) Payment of an amount that is disputed by the public entity. (2) “Claim” means a “Contractor” means any type of contractor within the meaning of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code who has entered into a direct contract with a public entity for a public works project. (3)(A) “Public entity” means, without limitation, except as provided in subparagraph (B), a state agency, department, office, division, bureau, board, or commission, the California State University, the University of California, a city, including a charter city, county, including a charter county, city and county, including a charter city and county, district, special district, public authority, political subdivision, public corporation, or nonprofit transit corporation wholly owned by a public agency and formed to carry out the purposes of the public agency. (B) “Public entity” shall not include the following:
(i) The Department of Water Resources as to any project under the jurisdiction of that department. (ii) The Department of Transportation as to any project under the jurisdiction of that department. (iii) The Department of Parks and Recreation as to any project under the jurisdiction of that department.
(iv) The Department of Corrections and Rehabilitation with respect to any project under its jurisdiction pursuant to Chapter 11 (commencing with Section 7000) of Title 7 of Part 3 of the Penal Code.
(v) The Military Department as to any project under the jurisdiction of that department. (vi) The Department of General Services as to all other projects. (vii) The High-Speed Rail Authority.
(4) “Public works project” means the erection, construction, alteration, repair, or improvement of any public structure, building, road, or other public improvement of any kind. (5) “Subcontractor” means any type of contractor within the meaning of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code who either is in direct contract with a contractor or is a lower tier subcontractor. (d)(1)(A) Upon receipt of a claim pursuant to this section, the public entity to which the claim applies shall conduct a reasonable review of the claim and, within a period not to exceed 45 days, shall provide the claimant a written statement identifying what portion of the claim is disputed and what portion is undisputed. Upon receipt of a claim, a public entity and a contractor may, by mutual agreement, extend the time period provided in this subdivision.

Page 507 of 1292 ends

GP-28
(B) The claimant shall furnish reasonable documentation to support the claim. (C) If the public entity needs approval from its governing body to provide the claimant a written statement identifying the disputed portion and the undisputed portion of the claim, and the governing body does not meet within the 45 days or within the mutually agreed to extension of time following receipt of a claim sent by registered mail or certified mail, return receipt requested, the public entity shall have up to three days following the next duly publicly noticed meeting of the governing body after the 45-day period, or extension, expires to provide the claimant a written statement identifying the disputed portion and the undisputed portion. (D) Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. If the public entity fails to issue a written statement, paragraph (3) shall apply.
(2)(A) If the claimant disputes the public entity’s written response, or if the public entity fails to respond to a claim issued pursuant to this section within the time prescribed, the claimant may demand in writing an informal conference to meet and confer for settlement of the issues in dispute.

Upon receipt of a demand in writing sent by registered mail or certified mail, return receipt requested, the public entity shall schedule a meet and confer conference within 30 days for settlement of the dispute.
(B) Within 10 business days following the conclusion of the meet and confer conference, if the claim or any portion of the claim remains in dispute, the public entity shall provide the claimant a written statement identifying the portion of the claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. Any disputed portion of the claim, as identified by the contractor in writing, shall be submitted to nonbinding mediation, with the public entity and the claimant sharing the associated costs equally. The public entity and claimant shall mutually agree to a mediator within 10 business days after the disputed portion of the claim has been identified in writing. If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the claim. Each party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator. If mediation is unsuccessful, the parts of the claim remaining in dispute shall be subject to applicable procedures outside this section.
(C) For purposes of this section, mediation includes any nonbinding process, including, but not limited to, neutral evaluation or a dispute review board, in which an independent third party or board assists the parties in dispute resolution through negotiation or by issuance of an evaluation.

Any mediation utilized shall conform to the timeframes in this section. (D) Unless otherwise agreed to by the public entity and the contractor in writing, the mediation conducted pursuant to this section shall excuse any further obligation under Section 20104.4 to mediate after litigation has been commenced.
(E) This section does not preclude a public entity from requiring arbitration of disputes under private arbitration or the Public Works Contract Arbitration Program, if mediation under this section does not resolve the parties’ dispute.
(3) Failure by the public entity to respond to a claim from a contractor within the time periods described in this subdivision or to otherwise meet the time requirements of this section shall result in the claim being deemed rejected in its entirety. A claim that is denied by reason of the public entity’s failure to have responded to a claim, or its failure to otherwise meet the time requirements

Page 508 of 1292 ends

GP-29
of this section, shall not constitute an adverse finding with regard to the merits of the claim or the responsibility or qualifications of the claimant.
(4) Amounts not paid in a timely manner as required by this section shall bear interest at 7 percent per annum.
(5) If a subcontractor or a lower tier subcontractor lacks legal standing to assert a claim against a public entity because privity of contract does not exist, the contractor may present to the public entity a claim on behalf of a subcontractor or lower tier subcontractor. A subcontractor may request in writing, either on his or her own behalf or on behalf of a lower tier subcontractor, that the contractor present a claim for work which was performed by the subcontractor or by a lower tier subcontractor on behalf of the subcontractor. The subcontractor requesting that the claim be presented to the public entity shall furnish reasonable documentation to support the claim. Within 45 days of receipt of this written request, the contractor shall notify the subcontractor in writing as to whether the contractor presented the claim to the public entity and, if the original contractor did not present the claim, provide the subcontractor with a statement of the reasons for not having done so.
(e) The text of this section or a summary of it shall be set forth in the plans or specifications for any public works project that may give rise to a claim under this section. (f) A waiver of the rights granted by this section is void and contrary to public policy, provided, however, that (1) upon receipt of a claim, the parties may mutually agree to waive, in writing, mediation and proceed directly to the commencement of a civil action or binding arbitration, as applicable; and (2) a public entity may prescribe reasonable change order, claim, and dispute resolution procedures and requirements in addition to the provisions of this section, so long as the contractual provisions do not conflict with or otherwise impair the timeframes and procedures set forth in this section.

Page 509 of 1292 ends

SP-1

SPECIAL PROVISION
PART 2 – BID ITEM DESCRIPTIONS
FOR

PAVING THE WAY PROGRAM

MONTEBELLO BLVD
(FROM LOS ANGELES AVE TO LINCOLN BLVD)
C.P. No. 888

IN THE CITY OF MONTEBELLO
All Bid Items shall be in accordance with the Standard Specifications for Public Works Construction (SSPWC), including supplements, State of California Department of Transportation (Caltrans) Standard Specifications, Latest Edition, and the Special Provisions and General Conditions of these specifications.

Mobilization/Demobilization - Mobilization and Demobilization is not a separate bid item , but will be incorporated in all bid unit prices in the bid schedule Mobilization shall conform to the provisions of Sections 9-3.4 of the Standard Specifications.

Mobilization and demobilization shall consist of preparatory work and operations including, but not limited to, those necessary for the movement of personnel, equipment, materials, and incidentals to and from the project site necessary for work on the project and for all other work and operations which must be performed or costs incurred including bonds, insurance, and financing prior to beginning work on the various contract items on the project site. Mobilization shall also include the time, materials, and labor to move the necessary construction equipment to and from the site, supervisory time on the job by the Contractor’s personnel to keep the construction site in a safe condition, and all other related work as required at all times and for all non-working days during the construction period. The Contractor is responsible for securing an adequate storage site for equipment and materials. Demobilization includes removal of all equipment and materials from the site, clean up and restoration of the work site at the end of project. Mobilization shall also include pressure washing of all USA markings, clearing and grubbing operations preceding and post construction consisting of removing all natural and artificial objectionable materials from the Right-of-Way in construction areas, road approaches and material sites. Clearing and grubbing shall conform to the provision of section 300-1 of the standard specifications.

No additional amounts shall be paid for erosion control, Best Management Practices (BMP), erosion damage clean-up, and removal of debris from the project site, NPDES requirements, or removal of soil and other materials deposited on public streets by construction traffic.

Best Management Practices (BMP) shall be defined as any program, technology, process, citing criteria, operating method, measure, or device, which controls, prevents, removes, or reduces

Page 510 of 1292 ends

SP-2
pollution. The Contractor shall obtain and refer to the California Storm Water Best Management Practice Handbooks, Volume 3, Construction BMP Handbook and the Los Angeles County Department of Public Works Best Management Practices Handbook for Construction Activities.

Los Angeles County Department of Public Works
Cashier’s Office
900 South Fremont Avenue
Alhambra, CA 91803
Telephone: 626-458-6959
The Contractor shall have a minimum of two readily accessible copies of each publication on the Contract site at all times plus any copies of applicable environmental mitigation plans.

Additional BMPs may be required as a result of a change in actual field conditions, contractor activities, or construction operation. When more than one BMP is listed under each specific BMP category, the Contractor shall select the appropriate and necessary number of BMPs within each category in order to achieve the BMP objective.

BMPs for Contractor activities shall be continuously implemented throughout the year and project time period. BMPs for erosion control and sedimentation shall be implemented during the period from October 15 to April 15, and whenever the National Weather Service Predicts rain within 24 hours. BMPs for erosion control and sedimentation shall also be implemented prior to the commencement of any Contractor activity or construction operation, which may produce run-off, and whenever run-off from other sources may occur.

The Agency (City), as a permittee thereto, is subject to enforcement actions by the State Water Resources Control Board, Environmental Protection Agency, and private citizens. The City will pass through to the Contractor any penalty assessed by these entities for each calendar day that the Contractor has not fully implemented the BMPs specified for the Contract and/or is otherwise in noncompliance with these provisions. In addition, the City will deduct, from the final payment due the Contractor, the total amount of any fines levied on the City, plus legal and staff costs, as a result of the Contractor’s lack of compliance with these provisions and/or less than complete implementation of the specified BMPs.

Mobilization and Demobilization is not a separate bid item, but will be incorporated in all bid unit prices in the bid schedule, and shall be considered full compensation for obtaining all business licenses and permits, as required for the entire project, from all related agencies, including, but not limited to, utility companies, private and public agencies and the City of Montebello; and complying with the requirements specified in those licenses and permits; coordination, field office facility, implementation of Best Management Practices, and incidentals necessary to perform all related items of work. No additional compensation will be allowed therefor.

Bid Item No. 1 – Project Information Signs
The Contractor shall supply, erect, and maintain public improvement project signs for the duration of construction according to the specifications set forth below. A scaled layout of the sign shall

Page 511 of 1292 ends

SP-3
be submitted to the City of Montebello for approval prior to fabrication. The sign is illustrated in “C”.

Size: 4 feet by 4 feet with a 7 feet clearance above ground level.

Materials: 3/4-inch (exterior type) plywood (C-C EXT-DFPA grade).

Support: 4-inch by 4-inch by 10 feet posts.

Mounting: Frame shall be constructed using 2 inches by 6 inches by 8 feet skids centered on each post and a 2 inch by 4 inches by 5 feet 6 inches 45-degree brace for each skid and a 2 inches by 6 inches cross-strut between the bottom of the posts all of bolted construction. Plywood panel shall be mounted using 3/8 inch by 5 inches carriage bolts at 16 inches maximum on center.

Paint: Panel Face: Three coats outdoor enamel (sprayed) Panel Rear and Frame: Two coats outdoor enamel (sprayed).

Color: Stark white background and blue lettering.

Lettering: Silkscreen enamels, Helvetica medium.

Covering: 1/4 inch clear plastic.

Location: The signs shall be placed at each end of the street that work is being constructed on. If various locations of work are included, the signs will be moved by the Contractor per the City’s schedule.

Duration: The signs shall be placed a minimum of one week prior to start of work.

Disposition: After the Notice of Completion is issued, the sign shall become the property of the City, and the Contractor shall deliver the sign to the Public Works Facility at no expense to the City.

Payment for Project Information Signs shall be based on Each (EA) Unit Price basis and shall include full compensation for all labor materials, tools, equipment, and for doing all work involved, including delivery of the sign to the Public Works Facility at the end of the project.

Bid Item 2 - Traffic Control and Stage Construction
Traffic Control, Traffic Control plan, construction signing and traffic maintenance shall comply with the provisions of Subsection 7-10 of the Standard Specification, Subsection 56-2 of the Caltrans Standard Specifications, and the current requirements set forth in the “Manual of Traffic Controls for Construction and Maintenance Work Zones” published by the Department of Transportation, State of California, and Manual on Uniform Traffic Control Devices (CAPage 512 of 1292 SP-4
MUTCD), Latest Edition, by the Federal Highway Administration and California, the traffic control plans and these Special Provisions.

The Contractor shall maintain the following clearances from the edge of traffic lanes:
1) 5 feet to any excavation,
2) 2 feet to curbs or temporary concrete barriers,
3) 10 feet to poles and other obstructions on uncurbed roadways.

If determined by the Engineer that it is necessary to decrease these minimum distances to allow for the prosecution of the work, the Contractor shall provide all protective devices required by the Engineer to adequately protect the public.

PUBLIC CONVENIENCE
Within ten (10) working days after the date of the City’s execution of the Contract Agreement the Contractor shall submit a proposed Construction Schedule for approval. Based on the approved project schedule, the Contractor shall notify residents and businesses of the proposed work and post temporary “NO PARKING” signs at no cost to the City. Signs shall be posted at all intersections, and on each side of the street a maximum of 200 feet between signs. Signs may not be attached to existing poles, street lights standards or trees. All signs must be posted on delineators or stakes provided by the Contractor. The “NO PARKING” signs shall be in place not less than seventy two (72) hours prior to performing the work; therefore a request for changes in the schedule requiring additional posting shall be submitted by the Contractor for approval by the Engineer at least seventy-two (72) hours prior to reconstruction and paving the street. All conflicting parking signage shall be covered.

Due to the nature of this project involving major inconvenience to residents and businesses, a good Public Relations Program is mandatory and evidence of satisfactory past performance in this area will be required.

The Contractor is to distribute two (2) City-approved “Public Notice” to each residence and business affected by the project. The first notice shall be distributed ten (10) calendar days prior to the start of any work. The second notice shall be distributed at least seventy two (72) hours prior to the start of work on a specific section of the street. A sample copy of the notice must be approved by the City. Said notice shall be attached to a red information hanger provided by the Contractor and hung on the gate or front door knob. The Contractor shall also coordinate with the bus services to ensure the safe operation of buses and access to bus stops in the construction area.

Notices shall be in English and Spanish languages.

The Contractor shall also coordinate with the street sweeping, trash disposal, Montebello Bus Lines and postal services agencies to ensure the safe operation of their vehicle and access in the construction area.

All complaints received by the City associated with the construction project alleging damage to private property and vehicles shall be responded to by the Contractor within twenty-four (24) hours

Page 513 of 1292 ends

SP-5
(one working day) of notification. Failure to comply with this provision may result in a penalty of One Hundred dollars ($100.00) per occurrence.

All trucks, which the Contractor proposes to use, that exceed the legal load limit when loaded will be required to have overweight permits issued by the City.

The Contractor shall be responsible for adequate barricading of the work area and controlling of traffic in the vicinity of the project as specified in Subsection 7-10 of the General Provisions.

PROTECTION OF WORK AND PUBLIC
The Contractor shall take all necessary measures to protect work and prevent accidents during any and all phases of the work. The Contractor shall repair all damaged pavement as a result of vandalism (i.e., vehicle tracks, footprints, graffiti, etc.) If deemed necessary by the City, the Contractor shall repair the defective area in accordance with these special provisions.

CONSTRUCTION SIGNING
Construction signing shall consist of furnishing, installing, maintaining and removing construction signs and barricades as required by the “California Manual on Uniform Traffic Control Devices”, CA-MUTCD. The traffic control system shall be installed on a road prior to starting work for that road and shall not be removed until all work has been completed on that road. Existing speed limit signs, which conflict with the work zone speed limit, shall be covered during the entire construction period.

TRAFFIC MAINTENANCE
The Contractor shall be responsible for handling vehicular and pedestrian traffic in accordance with Subsection 7-10 of the Standard Specifications and these Special Provisions.

The Contractor shall prepare all necessary traffic control plans and submit to the City for approval at the pre-construction meeting. The traffic control plans shall be prepared by a California Licensed Traffic Engineer and shall show:

1. Notification Signs.

2. Existing and temporary lane lines.

3. Dimensions of the work zone and street improvements.

4. Advance warning signs.

5. Delineators

6. Lighting, for nighttime work.

The plans shall be submitted to the City at the preconstruction meeting prior to commencing work and shall incorporate a complete and separate plan for each stage of construction proposed by the Contractor. This plan shall indicate the sequence of lanes or portions of lanes being closed for each phase. The traffic control plans shall indicate the travel plan for each phase of construction.

The traffic control plans shall state:

Page 514 of 1292 ends

SP-6

1. That the plan will conform to “California Manual on Uniform Traffic Control Devices”, CA-MUTCD.

2. Emergency contact person and phone number.

3. Minimum lane widths and minimum clearance to obstructions.

The traffic control plan shall be approved by the City of Montebello prior to beginning any removals.

The Contractor shall cooperate with the City of Montebello relative to handling traffic through all work areas and shall make his own arrangements relative to keeping the working area clear of parked vehicles and maintaining clear access to driveways.

The Contractor shall furnish and install construction notification signs as shown on traffic control plans and as specified by the City of Montebello.

The Contractor shall provide for controlled pedestrian crossings through the work. Crossings shall provide pedestrians a means of passing over or through the work without tracking tack coat or hot asphalt concrete or P.C.C. work or endangering pedestrian safety. All temporary pedestrian crossings shall be in compliance with the latest Americans with Disabilities Act design standards and supplements.

At intersections, if a cross road needs to be temporarily closed when work is in progress through the intersection and the anticipated traffic delay is more than five (5) minutes, a detour sign shall be installed on the cross street and shall include the installation of advance signing displaying the anticipated delay time. The signing of the detour route shall be approved by the Engineer prior to installation of the detour and closure of the road.

The Contractor shall provide for one lane of travel in each direction at all times unless approved by the Engineer. When two-way traffic is restricted to one lane in each direction, and when applying paving past intersecting roads, traffic shall be controlled as required by the “California Manual on Uniform Traffic Control Devices”, CA-MUTCD. A pilot car and driver will be required at various locations if control by flaggers and/or control devices proves deficient in the opinion of the Engineer. In no case shall the Contractor provide less than one (1) lane of travel in each direction through the construction zone including cross-streets.

Contractor’s equipment and personal vehicles of the Contractor’s employees shall not be parked on the traveled way at any time. Overnight parking of construction equipment shall be confined to an approved storage site selected by the Contractor and approved by the City.

TEMPORARY GUIDE MARKERS
Temporary guide markers shall be portable Caltrans Standard Specifications approved delineators.

Only one type of temporary guide marker shall be used on any road at any one time.

Page 515 of 1292 ends

SP-7
Temporary guide markers shall be placed adjacent to the edge of all vertical lips or excavations that exceed 3/4 inches. If the temporary guide markers are damaged, or are not in an up-right position, from any cause, said markers should immediately be replaced or restored to their original locations, in an upright position by the Contractor.

PORTABLE DELINEATORS
The vertical portion of the portable delineators shall be brilliant orange or predominantly orange in color. The posts shall be not less than 100 square inches, measured through the vertical axis of the delineator, normal to the roadway. The minimum height shall be thirty-seven (37) inches above the traveled way.

Two 4-inch nominal width reflective bands shall be mounted a minimum of 1 ½ inches apart and at a height on the post so that one reflective band will be between 2.5 feet and 3 feet above the roadway surface.

Reflective bands shall be flexible vinyl plastic, either white or yellow, and shall have not less than the following dry reflective values at a 0.2 degree divergence angle, expressed I units if candlepower per foot-candle per square foot. The wet reflective values shall not be less than ninety percent (90%) of the dry values.

Dry Reflective Value
Angle of Incidence 4º 5º 30º
White 250 165 50
Yellow 10 110 50
All tests for reflective values shall be performed in accordance with California Test Method No. 642.

The portable delineators shall be spaced as necessary for proper delineation; however, in no case shall the spacing between portable delineators exceed thirty (30) feet on tangents or twenty (20) feet on curves.

FLUORESCENT TRAFFIC CONES
Provide lighted flashers and lighting for night time. Traffic cones shall be fluorescent new or reconditioned and of good commercial quality, flexible material suitable for the purpose intended.

The outer section of the portion above the base of the once shall be highly pigmented fluorescent orange polyvinyl compound. The overall height of the cone shall be anchored in a manner such that the traffic cone will remain in an upright position. Lighted flashers and lighting shall be provided additionally for nighttime.

The fluorescent traffic cones shall be spaced as necessary for proper delineation; however, in no case shall the spacing between fluorescent cones exceed thirty (30) feet on tangents or twenty (20) feet on curves.

Page 516 of 1292 ends

SP-8

STRIPING
Temporary striping and marking for traffic control shall conform to Section 310-5.6.5 of the Standard Specifications. Temporary striping and marking which has no further use shall be removed by wet sandblasting, and all sand used in sandblasting shall be removed without delay as the sandblasting operation progresses.

RESTRICTIONS ON CLOSURE OF STREETS AND TRAFFIC LANES
The Contractor shall conduct all operations so as to provide access to the adjoining properties and have no greater length or quantity of work under construction that can be properly prosecuted with a minimum of inconvenience to the public.

The Contractor shall construct temporary A.C. ramps or equal to provide safe and drivable access to residents and business properties daily.

The Contractor shall coordinate all shipments and deliveries to businesses. If steel plates are required, they shall be provided by the Contractor at no additional cost to the City.

The Contractor shall be responsible for furnishing, placing and maintaining barricades and lights as necessary to protect the public from danger due to the work being done.

No additional amounts shall be paid for erosion control, erosion damage clean-up, and removal of debris from the project site, NPDES requirements, or removal of soil deposited on public streets by construction traffic.

Payment for Traffic Control and Stage Construction shall be included in the Lump Sum (LS) Price bid and shall be considered full compensation for providing and maintaining safe traffic control including all temporary signs, striping and delineation, preparing and providing traffic control plan during the project, obtaining all approvals and permits, as required, from all related agencies, including, but not limited to, public agencies and the City of Montebello; and complying with the requirements specified in those licenses and permits, coordination, field office facility; and incidentals necessary to perform all related items of work.

Bid Item No. 3 – Provide Construction Survey
It shall be the responsibility of the Contractor to supply any and all construction surveying and staking required. All surveying shall be performed under the direct supervision of a California Licensed Land Surveyor or a Civil Engineer duly licensed to perform land surveying.

It is the Contractor’s responsibility to Re-establish Survey Monuments and Centerline ties as disturbed in the field and shall conform to Standard Specification for Public Works Construction Section 309 and as modified below. All work done on monuments shall be recorded and copies thereof filed with the City of Montebello Engineer and the County Surveyor. This work will include all re-establishment of all monuments that are disturbed through the course of completing

Page 517 of 1292 ends

SP-9
this project, including property tags due to any concrete removal and replacement at sidewalk or curb and gutter.

A corner record survey shall be completed and filed with the County of Los Angeles Surveyor for each survey monument that the Contractor resets. A copy of each corner record shall be provided to the City of Montebello after filing with the County.

Construction Staking consists of furnishing transportation, labor, materials, and equipment to provide surveying and field engineering under the direction of a land surveyor or professional engineer licensed in the State of California. Furnish skilled labor, instrument platforms, ladders and such other temporary structures, required lighting for making and maintaining points and lines in connection with the surveys required.

Construction Staking shall conform to the Standard Specification Section 2-9. Work under this Section includes, but is not limited to, the following:

1. Establish and maintain horizontal and vertical control points from City of Montebellosupplied benchmarks and baselines.

2. Establish temporary benchmarks.

3. Layout of all work.

4. Construction staking for earthwork and paving work required on the project.

5. Control, staking, and grade checking for all earthworks.

6. Control for construction of reinforcing steel, concrete work, and structural steel work.

7. Maintain records on reproducible contract drawings (ASCII points file) of as-constructed locations of project components and features during the course of the project.

The City of Montebello reserves the right to check the accuracy of Contractor's survey measurements and calculations. Regardless of whether or not the City of Montebello exercises this right, the requirements for Contractor accuracy and adequacy will not be waived.

Copies of all completion survey notes, and other data shall be furnished to the City of Montebello prior to beginning work that requires their use.

Prior to completion of Project and when requested by the City of Montebello, Contractor shall submit a copy of project drawing and certificate signed by California Registered Land Surveyor or Professional Engineer as applicable, that elevations and locations of Work are in conformance with Contract Documents.

Contractor shall set permanent monuments and file “Record of Survey Map”. The contractor shall be responsible to maintain a complete and accurate log of control and survey work as it progresses.

Contractor shall field verify locations of survey control points prior to starting any work on the Project Site. Contractor shall establish and submit to the City of Montebello any temporary control

Page 518 of 1292 ends

SP-10
points as necessary due to construction activity. The Contractor shall notify the City of Montebello of any discrepancies discovered and resolve prior to starting any work.

The Contractor shall lay out work from the City of Montebello's established control points, baselines, ranges and gauges and shall be responsible for all measurements in connection therewith. Furnish, at Contractor's expense, all stakes, templates, platforms, equipment, range markers, and labor as may be required in laying out any part of the Work from the points and lines established by the City of Montebello. The Contractor will be held responsible for the execution of the Work to such lines and grades as may be established or indicated by the City of Montebello.

It shall be the responsibility of the Contractor to maintain and preserve all stakes and other marks established by the Surveyor/Engineer retained by the Contractor until authorized to remove them.

If such marks are destroyed by the Contractor or through negligence prior to their authorized removal, they may be replaced by the City of Montebello. The expense of replacement will be deducted from any amounts due, or to become due, the Contractor.

Surveying shall conform to methods, procedures, and requirements of the Caltrans Survey Manual.

Contractor shall set finish grades at a maximum of 25-ft. intervals for dirt, 25-ft. intervals for rock and at all grade breaks. Contractor shall establish or reestablish baselines and field control points as necessary and provide all basic site engineering to assure accurate locations and elevations for construction. It will be Contractor’s responsibility to verify location and elevation of existing structures and utilities as required for new work.

Control datum for survey may be indicated on Contract Drawings. Contractor shall locate and protect, or replace survey control and reference points, preserve permanent reference points during construction and provide record of survey for replacement at record monument. The Contractor shall report to the City of Montebello loss or destruction of any reference point or relocation required because of changes in grades or other reasons and replace dislocated survey control points based on original survey control. There will be no changes without prior written notice to the City of Montebello.

Payment for Provide Construction Survey shall be paid for at the contract unit price per Lump Sum (LS) and shall be considered full compensation for furnishing labor, materials, equipment and removal after construction, and no additional compensation will be allowed therefor.

Contractor shall submit electronic files of surveys conducted for Progress Payments with each Pay Request.

Bid Item No. 4 – Remove Tree and Stump
This Bid Item shall include removing existing tree, grinding stumps and associated roots to the diameter of the trunk at existing grade and to the depth of 3-foot below existing grade. Grindings shall be removed from this 3-foot hole. The hole shall then be filled with soil and compacted to 90-percent relative compaction.

For trees indicated on the project for removal, the Contractor shall place a visible removal “tag” on these trees prior to removal; City Engineer shall approve the removal of tagged tree within three working days after tagging. Tree shall be removed in a workmanlike manner so as not to injure

Page 519 of 1292 ends

SP-11
other standing trees or improvements to be preserved. Contractor shall remove the tree, stump, and all roots larger than 1-1/2 inches in diameter to 36 inches below grade for tree indicated for removal on the drawings. Any water lines to remain shall be protected in place. Hole created from removal of tree stump shall be backfilled compacted, and graded to finish level by the end of the workday. All debris from pruning or removing tree shall be cleaned up and hauled away from the work site on the same day that the tree is removed.

Removal of trees shall be approved by Certified Arborist. Tree removal shall be performed by a Certified Arborist hired by the Contractor and in accordance with “Pruning Standards,” published by the Western Chapter of the International Society of Arboriculture. The Arborist can be a person in the employment of the Contractor as long as the person has been certified by the Western Chapter of the International Society of Arboriculture. The Certified Arborist shall be approved in advance by the Engineer, and all removal shall be done in the presence of the City Engineer.

Payment for Remove Existing Tree and Stump shall be paid at the contract unit price per Each (EA) and shall include full compensation for removing, furnishing all labor, tools, equipment, sawcutting, hauling, properly disposing of materials and incidentals for doing all the work involved complete in place. No additional compensation will be allowed therefor.

Bid Item No. 5 – Roadway Excavation
This section shall conform to Subsection 300-2 of the Standard Specifications and these Special Provisions and as shown on these plans. Roadway excavation includes additional removals below the existing asphalt concrete, concrete pavement, and 24-inch overexcavation within the proposed median landscaped areas. Material shall become the property of the Contractor. The Contractor shall be responsible for disposal of surplus materials outside of project right of way.

Payment for Roadway Excavation shall be paid at the contract unit price bid per Cubic Yard (CY) and shall include full compensation for doing all work, including furnishing all materials, labor, equipment, tools, disposal of materials, and incidentals as required and no additional compensation will be allowed therefore.

The price includes protection of existing utilities located within the excavation limits.

Bid Item No. 6 – Remove Existing Asphalt Concrete (AC) Pavement This section shall conform to Subsection 300-2 and 300-4 of the Standard Specifications and these Special Provisions. Remove existing AC pavement shall consist of all excavation including sawcutting and removal of roadways bituminous pavement as shown on the plans.

Payment for Remove Existing AC Pavement shall be paid at the contract unit price bid per Square Foot (SF) and shall include full compensation for doing all work, including furnishing all materials, labor, equipment, tools, and incidentals as required and no additional compensation will be allowed therefore.

Page 520 of 1292 ends

SP-12
Bid Item No. 7 – Remove Existing Concrete Pavement
This Bid Item shall conform to Subsection 300-2 and 300-4 of the Standard Specifications and these Special Provisions. Remove existing concrete pavement shall consist of all excavation including sawcutting and removal of concrete pavement as shown on the plans.

Payment for Remove Existing Concrete Pavement shall be paid at the contract unit price bid per Square Foot (SF) and shall include full compensation for doing all work, including furnishing all materials, labor, equipment, tools, and incidentals as required and no additional compensation will be allowed therefore.

Bid Item No. 8 – Remove Existing Concrete Sidewalk
This Bid Item shall include all labor, material and equipment required to sawcut, remove, haul away and properly dispose of existing concrete sidewalk and sub-grade compaction. Removal of concrete sidewalk as shown on the Contract Drawings shall conform to Subsections 300-1.3.2 (b and c) of the Standard Specifications for Public Works Construction.

Sawcutting shall be accomplished by the use of a power driven saw. The depth of the cut shall be deep enough to provide a clean, straight break without loosening, cracking, or damaging adjoining asphalt or concrete. A clean sawcut edge shall be maintained until new concrete sidewalk is constructed. Generally sawcuts shall be on existing joints or score mark.

All necessary sawcutting of existing concrete sidewalks shall be to the lines shown on plans.

Sawcutting shall be included in the unit price and no further compensation shall be made.

This item shall include root clearing and/or tree root removal of the sections immediately adjacent and underneath sidewalk in order to bring new sidewalk to final finish grade. Full compensation for root clearing and tree root removal shall be included in the unit price of sidewalk and no further compensation shall be made.

All existing improvements including Fence/Wall/Gates/Plants/Grass/Trees/Irrigation Systems/etc. that might be damaged during construction should be photographed and videotaped and it is Contractor’s responsibility to protect all existing adjacent features such as landscaping, irrigation system, property’s fence/wall/gates, curb and gutter, pull boxes, utility boxes, and etc. in place per section 300-1.2 of Standard Specifications for Public Works Construction. All damages to these items shall be fixed to the satisfaction of the City of Montebello without any additional compensation. All materials to be removed as indicated on the plans shall be disposed of at a legal site as specified in subsection 300-1.3 of the Standard Specifications for Public Works Construction.

Payment for Remove Existing Concrete Sidewalk shall be paid for at the contract unit price per Square Foot (SF) and shall be considered full compensation for complying with the above requirements and shall include furnishing of labor, materials, equipment, sawcutting, removal, excavation, hauling, properly disposing, protection of facilities, grading, sub- grade compaction, restoration and incidentals for doing all the work involved complete in place and no additional compensation will be allowed.

Page 521 of 1292 ends

SP-13
Bid Item No. 9 – Remove Concrete Curb and Median Improvements This Bid Item shall include all labor, material and equipment required to sawcut, remove, haul away and properly dispose of existing median concrete curb, a 1-foot-wide full-depth strip of AC pavement for forming and sub-grade compaction, and all existing median improvements between curbs. Removal of median concrete curb and median improvements as shown on the Contract Drawings and as directed in the field by the Engineer, shall conform to Subsection 300-1.3.2 (c) of the Standard Specifications for Public Works Construction.

Sawcutting shall be accomplished by the use of a power driven saw. The depth of the cut shall be deep enough to provide a clean, straight break without loosening, cracking, or damaging adjoining asphalt or concrete. A clean sawcut edge shall be maintained until new concrete median curb is constructed. Generally sawcuts shall be on existing joints or score mark.

All necessary sawcutting of existing concrete curb and gutter shall be to the lines as shown on plans and as directed in the field by the Engineer. Sawcutting shall be included in the unit price and no further compensation shall be made.

All existing improvements including Fence/Wall/Gates/Plants/Grass/Trees/Curb Drains/Irrigation Systems/etc. that might be damaged during construction should be videotaped and it is Contractor’s responsibility to protect all existing adjacent features such as landscaping, irrigation system, property’s fence/wall/gates, curb and gutter, pull boxes, utility boxes, and etc. in place per section 300-1.2 of Standard Specifications for Public Works Construction. All damages to these items shall be fixed to the satisfaction of the City of Montebello without any additional compensation. All materials to be removed as indicated on the plans shall be disposed of at a legal site as specified in subsection 300-1.3 of the Standard Specifications for Public Works Construction.

Payment for Remove Concrete Curb and Median Improvements shall be paid for at the contract unit price per Lineal Foot (LF) of median curb around the perimeter of the median and shall be considered full compensation for complying with the above requirements and shall include furnishing of labor, materials, equipment, sawcutting, removal, excavation, hauling, properly disposing, protection of facilities, grading, sub-grade compaction, restoration and incidentals for doing all the work involved complete in place and no additional compensation will be allowed.

Removal of a 1-foot-wide, full-depth strip of AC pavement along median curb and all median improvements between the curbs is included in this removal bid item and no additional compensation will be allowed.

Bid Item No. 10 – Remove Existing Curb Ramp
This Bid Item shall include all labor, material and equipment required to sawcut, remove, haul away and properly dispose of existing concrete curb ramp, adjacent sidewalk, ramping transition with concrete curbs, curb and/or gutter, paving as required for forming, planting area, base, sub

Page 522 of 1292 ends

SP-14
base, native and all existing improvements to provide clear area for construction of new curb ramp; also shall include transitions to comply with ADA requirements. Removal of concrete curb ramp as shown on the Contract Drawings and as directed in the field by the Engineer shall conform to Subsection 300-1.3.2 (b and c) and 300-2 of the Standard Specifications for Public Works Construction. Concrete shall be Class 520-C-2500 as specified in Section 201-1.1.2 of the Standard Specifications for Public Works Construction.

Sawcutting shall be accomplished by the use of a power driven saw. The depth of the cut shall be deep enough to provide a clean, straight break without loosening, cracking, or damaging adjoining asphalt or concrete. A clean sawcut edge shall be maintained until new concrete Curb Ramp is constructed. Generally sawcuts shall be on existing joints or score mark.

All necessary sawcutting of existing concrete Curb Ramp or any existing improvements shall be to the lines as shown on plans and as directed in the field by the Engineer. Sawcutting shall be included in the unit price and no further compensation shall be made.

Payment to Remove Existing Curb Ramp shall be paid for at the contract unit price per Each (EA) and shall include full compensation for furnishing all labor, materials, tools, equipment, backfilling, grading, compacting, forming, pouring, finishing, hauling, properly disposing, and incidentals for doing all the work involved complete in place and no additional compensation will be allowed therefor.

Bid Item No. 11 – Remove Existing Driveway
This Bid Item shall include all labor, material and equipment required to sawcut, remove, haul away and properly dispose of existing concrete driveway as shown on the plans and as required for forming, base, sub base, native and all existing improvements to provide clear area for construction of new driveway; also shall include transitions to comply with ADA requirements.

Removal of driveway as shown on the Contract Drawings and as directed in the field by the Engineer shall conform to Subsection 300-1.3.2 (b and c) and 300-2 of the Standard Specifications for Public Works Construction. Concrete shall be Class 520-C-2500 as specified in Section 201-

1.1.2 of the Standard Specifications for Public Works Construction.

Sawcutting shall be accomplished by the use of a power driven saw. The depth of the cut shall be deep enough to provide a clean, straight break without loosening, cracking, or damaging adjoining asphalt or concrete. A clean sawcut edge shall be maintained until new concrete driveway is constructed. Generally sawcuts shall be on existing joints or score mark.

All necessary sawcutting of existing concrete driveway or any existing improvements shall be to the lines as shown on plans and as directed in the field by the Engineer. Sawcutting shall be included in the unit price and no further compensation shall be made.

Payment to Remove Existing Driveway shall be paid for at the contract unit price per Each (EA) and shall include full compensation for furnishing all labor, materials, tools, equipment, backfilling, grading, compacting, forming, pouring, finishing, hauling, properly disposing, and

Page 523 of 1292 ends

SP-15
incidentals for doing all the work involved complete in place and no additional compensation will be allowed therefor.

Bid Item No. 12 – Remove Existing Cross Gutter
This Bid Item shall include all labor, material and equipment required to sawcut, remove, haul away and properly dispose of existing concrete cross gutter and/or spandrel and related adjacent areas needed to construct a cross gutter and/or spandrel.

Sawcutting shall be accomplished by the use of a power driven saw. The depth of the cut shall be deep enough to provide a clean, straight break without loosening, cracking, or damaging adjoining asphalt or concrete. A clean sawcut edge shall be maintained until new concrete Cross Gutter and/or Spandrel is constructed. Generally sawcuts shall be on existing joints or score mark.

All necessary sawcutting of existing concrete Cross Gutter and/or Spandrel shall be to the lines as shown on plans and as directed in the field by the Engineer. Sawcutting shall be included in the unit price and no further compensation shall be made.

Payment for Remove Existing Cross Gutter shall be paid for at the contract unit price per Square Foot (SF) and shall be considered full compensation for complying with the above requirements and shall include furnishing of labor, materials, equipment, sawcutting, removal, excavation, hauling, properly disposing, protection of facilities, grading, sub-grade compaction, restoration and incidentals for doing all the work involved complete in place and no additional compensation will be allowed.

Removal of a 2-foot-wide, full-depth strip of AC pavement along the curb and gutter for forming is included in this removal bid item and no additional compensation will be allowed.

Bid Item No. 13 – Remove and Dispose of Pedestrian Push Button and Post This item includes remove and dispose of existing pedestrian push button, posts and post foundations as shown on plans. The Contractor shall coordinate with the Engineer and update crosswalk traffic signal timing for the east/west direction on Montebello Blvd.

Payment for Remove and Dispose of Pedestrian Push Button and Post shall be per the contract price per Each (EA) as shown in the Bid Schedule. Payment shall include full compensation removes and dispose of existing pedestrian posts, post foundations, push button, coordinate and update timing as directed by the Engineer, furnishing all labor, tools, materials, equipment, and work involved to complete this work. No additional compensation will be allowed therefore.

Bid Item No. 14 – Remove Exist Curb and Gutter
This Bid Item shall include all labor, material and equipment required to sawcut, remove, haul away and properly dispose of existing concrete curb and gutter, local depression, and, a 1-footwide, full-depth strip of AC pavement for forming and sub-grade compaction. Removal of median concrete curb as shown on the Contract Drawings and as directed in the field by the

Page 524 of 1292 ends

SP-16
Engineer, shall conform to Subsection 300-1.3.2 (c) of the Standard Specifications for Public Works Construction.

Sawcutting shall be accomplished by the use of a power driven saw. The depth of the cut shall be deep enough to provide a clean, straight break without loosening, cracking, or damaging adjoining asphalt or concrete. A clean sawcut edge shall be maintained until new concrete median curb is constructed. Generally sawcuts shall be on existing joints or score mark.

All necessary sawcutting of existing concrete curb and gutter shall be to the lines as shown on plans and as directed in the field by the Engineer. Sawcutting shall be included in the unit price and no further compensation shall be made.

Payment for Remove Exist Curb and Gutter shall be paid for at the contract unit price per Lineal Foot (LF) and shall be considered full compensation for complying with the above requirements and shall include furnishing of labor, materials, equipment, sawcutting, removal, excavation, hauling, properly disposing, protection of facilities, grading, sub-grade compaction, restoration and incidentals for doing all the work involved complete in place and no additional compensation will be allowed.

Removal of a 1-foot-wide, full-depth strip of AC pavement along median curb is included in this removal bid item and no additional compensation will be allowed.

Bid Item No. 15 – Cold Mill Exist AC Pavement (2”)
Cold milling shall conform to the provisions of Section 302-1 of the Standard Specifications for Public Works Construction. The Contractor shall cold mill existing asphalt concrete (AC) pavement to the depth required for the placement of new pavement as shown on the plans and as directed in the field by the Engineer. All work shall be completed in accordance with lines and grades, and typical cross-sections shown on the drawings. Any extra cold milling beyond the shown limits shall be at the Contractor’s expense.

All existing asphalt concrete (AC) pavement to join new construction shall be sawcut in a straight line. Contractor shall exercise due caution to avoid any damage to existing improvements, protecting in-place of existing water mains, sewers, storm drains, meters, valve covers, wall, fences, curbs, fire hydrants, telephone and power poles, and other existing structures.

It is the Contractor’s responsibility to perform whatever additional exploration is necessary to avoid causing any damage to the existing utilities under the work area. Any damage done by the Contractor shall be repaired or replace as called out in Section 7-9 of the Standard Specifications for Public Works Construction at the Contractor’s expense.

This work shall consist of cutting existing asphalt concrete (AC) pavement to facilitate its removal.

Any sawcutting shall be accomplished by the use of a power-driven saw to provide a clean, straight break without loosening, cracking, or damaging adjoining asphalt or concrete. A clean sawcut edge shall be maintained until surface course AC is constructed. Under this item, the use of a grinder will not be allowed in lieu of power-driven saw.

Page 525 of 1292 ends

SP-17
During the cold milling operation, the Contractor shall remove all loosened materials from milled areas, haul away and dispose of them at a legal site as specified in Sub-section 300-1.3 of Standard Specifications for Public Works Construction and submit evidence of the proper disposal to the City of Montebello. The Contractor shall abate dust nuisance by cleaning, sweeping, and sprinkling with recycled water (if available) or other means as necessary.

Any petromat found during grinding shall be removed by scraping and by burning it with a torch.

The Contractor shall be responsible for assuming the cost of removing, hauling, recycling and any other incidental of any petromat found during grinding operation and no adjustment on the Bid price shall be made.

Also, The Contractor shall remove all asphalt residuals along existing gutter.

Crack Sealing (Not a Bid item)
After the completion of the cold milling operation, ¼” wide cracks and larger shall be cleaned by hot air blowing to provide intact bonding surfaces which are free of moisture and debris. After the cracks have been properly cleaned, they shall be sprayed with an approved soil sterilant, and then filled with SS-1H asphaltic emulsion and sanded. Cracks and pop-outs larger than 1” wide shall be sealed with a D2-SC-800 stockpile mix.

Payment for Cold Mill of Exist AC Pavement (2”) shall be paid for at the price bid per Square Foot (SF) and shall be considered full compensation for furnishing labor, materials, equipment, sawcutting, removals, hauling and disposal of asphalt concrete materials excavated or grinded, grade for the base, crack sealing, compaction and no additional compensation will be allowed therefore.

Bid Item Nos. 16 and 17 – Asphalt Concrete Pavement
All work shall conform to Sections 302-5 and 400-4 of the “Standard Specifications for Public Works Construction” and these Special Provisions.

Asphalt concrete shall be Type B-PG-64-10 for 3” and 5” base course. Tack coat shall be Grade SS-1H, per Section 302-5.4 and shall be applied to the perimeter of all AC removal and replacement locations and cold milling locations. (All tack coat overspray on gutter lip shall be removed.)
Contractor shall use C2-PG 64-10 for 2” A.C. overlay.

The Contractor shall use a PG Asphalt Binder.

PG Asphalt binder shall conform to the following requirements:

1. Description

Page 526 of 1292 ends

SP-18
Asphalt shall consist of refined petroleum or a mixture of refined liquid asphalt and refined solid asphalt, prepared from crude petroleum. Asphalt shall be:

A. Free from residues caused by the artificial distillation of coal, coal tar, or paraffin.

B. Free from water.

C. Homogeneous.

2. Materials
A.General
The Contractor shall furnish asphalt in conformance with the State of California Department of Transportation (Caltrans) “Certification Program for Suppliers of Asphalt.” Caltrans maintains the program requirements, procedures, and a list of approved suppliers can be obtained from (Caltrans).

The Contractor shall ensure the safe transportation, storage, use, and disposal of asphalt.

The Contractor shall prevent the formation of carbonized particles caused by overheating asphalt during manufacturing or construction.

B. Grades
Performance graded (PG) asphalt binder shall be PG 64-10 and conform to the following:

Performance Graded Asphalt Binder
Specification
Grade
Property
AASHTO
Test
Method
PG
58-22 a
PG
64-10
PG
64-16
PG
64-28
PG
70-10
Original Binder
Flash Point, Minimum ºC T48 230 230 230 230 230
Solubility, Minimum % b T44 99 99 99 99 99
Viscosity at 135ºC, c
Maximum, Pa’s
T316

3.0 3.0 3.0 3.0 3.0
Dynamic Shear,
Test Temp. at 10 rad/s, ºC
Mínimum G*/sin(delta),
kPa
T315
58 1.00
64 1.00
64 1.00
64 1.00
70 1.00
RTFO Test e,
Mass Loss, Maximum, %
T240

1.00 1.00 1.00 1.00 1.00
RTFO Test Aged Binder
Dynamic Shear,
Test Temp. at 10 rad/s, ºC
Mínimum G*/sin(delta),
kPa
T315
58 2.20
64 2.20
64 2.20
64 2.20
70 2.20

Page 527 of 1292 ends

SP-19
Ductility at 25ºC
Minimum, cm
T51
75 75 75 75 75
PAV f Aging,
Temperature, ºC
R28
100 100 100 100 100
Notes:
a. Recommended as asphalt rubber base stock for high mountain and high desert area. b. The Engineer may waive this specification if the supplier is a Quality Supplier as defined by the Caltrans’ “Certification Program for Suppliers of Asphalt.” c. The Engineer may waive this specification if the supplier certifies the asphalt binder can be adequately pumped and mixed at temperatures meeting applicable safety standards.
d. The sample will be tested at 3ºC higher if it fails at the specified test temperature.

G*sin(delta) shall remain 5000 kPa maximum.
e. “RTFO Test” means the asphaltic residue obtained using the Rolling Thin Film Oven Test, AASHTO Test Method T240 or ASTM Designation: D 2827. f. “PAV” means Pressurized Aging Vessel.

C. Sampling
The Contractor’s asphalt supplier shall provide a sampling device in the asphalt feed line connecting the plant storage tanks to the asphalt weighing system or spray bar.

The sampling device shall be accessible between 600 and 750 mm (30 inches) above the platform. The supplier shall provide a receptacle for flushing the sampling device.

The sampling device shall include a valve:
1) With a diameter between 10 and 20 mm.
2) Manufactured in a manner that a one-liter sample may be taken slowly at any time during plant operations.
3) Maintained in good condition.

The Contractor’s supplier shall replace failed valves.

In the presence of the City Engineer, the Contractor’s supplier shall take 2 oneliter samples per operating day. Round friction top containers with one-liter capacity for storing samples shall be provided.

RTFO Test and PAV Aged Binder
Dynamic Shear,
Test Temp. at 10 rad/s, ºC
Mínimum G*sin(delta), kPa
T315
22 d
5000
31 d
5000
28 d
5000
22 d
5000
34 d
5000
Creep Stiffness,
Test Temperature, ºC
Maximum S-value, MPa
Minimum M-value
T313
-12
300

0.300
0 300

0.300
-6
300

0.300
-18
300

0.300
0 300

0.300

Page 528 of 1292 ends

SP-20
D. Applying Asphalt
Unless otherwise specified, the Contractor shall heat and apply asphalt in conformance with the provisions in Caltrans Standard Specifications Section 93, “Liquid Asphalts.” The Contractor shall apply paving asphalt at a temperature between 120ºC and 190ºC.

The City Engineer will determine the exact temperature of paving asphalt.

Subgrade preparation shall conform to Section 301-1 of the Standard Specifications for sections containing no aggregate base. After removal of the existing pavement section to the depths required to place the new AC section, re-compaction of the existing subgrade, if non-AC or nonPC, will be required to 95 percent in conformance with the requirements set forth in Section 301-

1.3 of the Standard Specifications for Public Works Construction.

At all locations where new asphalt concrete pavement is joining existing asphalt pavement, the Contractor shall sawcut or cold mill/grind existing pavement to provide straight neat lines and place the new asphalt concrete to form a smooth transition. Payment for saw-cutting/grinding and removing the existing pavement shall be included in a separate Bid Item.

The Contractor shall be responsible for maintaining location of, and access to, all water line gate valves during construction operations.

Initial or breakdown compaction shall consist of a minimum of three roller passes coverage of a layer of asphalt mixture. A pass shall be a movement of a roller in both directions over the same path. Coverage shall be as many passes as are necessary to cover the entire width being paved.

Overlap between passes during any coverage made to insure compaction without displacement of material in accordance with good rolling practice shall be considered a part of the coverage being made and not a part of a subsequent coverage. Each coverage shall be completed before subsequent coverage is started. Pneumatic rollers shall not be used without prior approval of the City Engineer. The top AC layer of each lane, once commenced, shall be placed without interruption.

Within the State Right-of-Way, transporting, spreading and compacting of the AC shall comply with section 39-3.04 of Caltrans Standard Specifications (Latest Edition). The proportion of aggregate, amount of asphalt binder and the required asphalt content shall comply with Caltrans Standard Specifications (Latest Edition). Tack coat applications and requirements shall follow section 39-1.03C(6) of Caltrans Standard Specifications (Latest Edition). Tack coat shall be applied to all vertical surfaces of existing pavement in the surfacing against which additional material is to be placed and to a pavement to be surfaced.

Measurement
The quantities of the asphalt concrete to be paid for will be measured by the actual tonnage (ton) of material and no additional compensation will be allowed therefor. The Contractor shall furnish to the Engineer at the time of delivery of the material on the job site a legible copy of a Licensed Weighmaster’s Certificate showing gross, tare, and net weights of each truckload of asphalt concrete mixture.

Page 529 of 1292 ends

SP-21
Payment for Construct 2” AC Overlay (Type C2-PG 64-10), and Construct Asphalt Concrete shall be per the unit price bid per Ton (TON), and shall include full compensation for furnishing all labor, materials, tools, equipment, all surface preparation, including crack cleaning and sealing, soil sterilant, tack coating, spreading, grading, compacting, hauling, proper disposing, and incidentals for doing all the work involved complete in place.

The City will not compensate the Contractor for any additional costs incurred by change or lack of availability of asphalt binders or variation of oil pipes.

Temporary asphalt concrete work where required by the Engineer for traffic control or other purposes shall be considered included in the price bid for Traffic Control and no additional compensation will be allowed.

Bid Item No. 18 – Aggregate Base (AB)
Aggregate Base shall be Class II conforming to the requirements of the STANDARD SPECIFICATIONS Section 200-2.

The finished surface of the aggregate base, which is to receive asphalt concrete, shall be smooth and level and allow for a uniform depth of asphalt concrete.

Payment for Aggregate Base shall be made at the contract unit price paid per Cubic Yard (CY), as shown on the Bid Schedule, and shall include full compensation for furnishing all labor, materials, tack coat where required, tools, equipment, and incidentals to accomplish the work as specified herein, including but not limited to subgrade preparation, and no additional compensation will be allowed therefore.

Bid Item No. 19 and 23 – Construct Curb and Gutter and Curb This Bid Item shall also include all labor, material and equipment required to place new concrete curb and gutter, concrete median curb, sidewalk, access ramps, and local depression for the project as shown on the plans, as directed by the Engineer, and per these special provisions and technical specifications. All concrete work shall conform to the provisions of Section 303-5 of the Standard Specifications for Public Works Construction, Standard Plans for Public Works Construction and the Street Improvement Plans made part of these Specifications. Concrete shall be Class 520-C-2500 as specified in Section 201-1.1.2 of the Standard Specifications for Public Works Construction. Concrete curb and gutter shall be per Standard Plans for Public Work Construction, Standard Plan 120-2 type A1-8, over 6” AB.

Concrete median curb shall be constructed to the line, grades and design shown in Appendix “F” and as directed in the field by the Engineer. Existing median curb to be joined shall be sawcut on a neat, straight line at the join location.

The Contractor shall remove and replace any new concrete work with graffiti markings and blemishes at no additional cost to the City. Work shall include replacement of any AC removed to provide space for forming at no additional cost to the City.

Page 530 of 1292 ends

SP-22
Payment for concrete curb and gutter shall conform to the provisions of Subsection 303-5.9 of the Standard Specifications for Public Works Construction. Aggregate base material under curb, curb/gutter is included in Bid Item.

Prior to any removals Contractor and City Inspector shall meet at the sites where curb and gutter work is shown on the plans, and shall measure and mark the extent of removals. If there is a substantial discrepancy between field measurements and the data on the plans, then the issue shall be referred to the City Engineer for resolution. Contractor shall have a valid rationale why the field measurements widely differ from the plans. Contractor shall not begin any work unless a written authorization is given by the City Engineer.

Payment to Construct Concrete Curb and Gutter A2-8 per SPPWC Std Plan 120-2 and Construct Concrete Curb A1-8 per SPPWC Std Plan 120-2 shall be paid for at the contract unit price per Linear Foot (LF) and shall include full compensation for furnishing all labor, materials, tools, equipment, backfilling, grading, compacting, forming, pouring, finishing, hauling, properly disposing, and incidentals for doing all the work involved complete in place and no additional compensation will be allowed therefor.

Payment for one-foot wide AC Pavement strip along the curb and gutter for forming purposes shall be included in this bid item of work and no additional compensation will be allowed.

Bid Item No. 20 – Construct 4” PCC Concrete Sidewalk
This Bid Item shall also include all labor, material and equipment required to place concrete sidewalk for the project. Concrete sidewalk shall conform to the provisions of Section 303-5 of the Standard Specifications for Public Works Construction, Standard Plans for Public Works Construction and the Street Improvement Plans made part of these Specifications. Concrete shall be Class 520-C-2500 as specified in Section 201-1.1.2 of the Standard Specifications for Public Works Construction. Concrete sidewalk shall be a minimum 4” thick per the Standard Plans for Public Works Construction 112-2 and 113-2.

Concrete sidewalk shall be constructed to the line, grades and designs shown on the plans and as directed in the field by the Engineer. Existing surfaces to be joined shall be sawcut on a neat, straight line at the join location. The Contractor shall remove and replace any new concrete work with graffiti markings and blemishes at no additional cost to the City.

Payment for concrete sidewalk shall conform to the provisions of Subsection 303-5.9 of the Standard Specifications for Public Works Construction.

Payment for Construct 4” PCC Sidewalk per SPPWC Std. Plan 113-2 shall be made at the unit price bid per Square Foot (SF) and shall include full compensation for furnishing all materials, tools, labor and equipment for the completion of the work in place as specified in this contract document and shall include final subgrade preparation, dowel reinforcement, rebars, and no additional compensation shall be allowed therefore.

Page 531 of 1292 ends

SP-23
Bid Item No. 21 – Construct Cross Gutter and Spandrel
This Bid Item shall also include all labor, material and equipment required to construct new concrete cross gutter and/or spandrel for the project. Concrete cross gutter and/or spandrel shall conform to the provisions of Section 201-1 of the Standard Specifications for Public Works Construction and shall be placed in accordance with Section 303-5 of the Standard Specifications for Public Works Construction. Concrete cross gutter and/or spandrel shall be per Standard Plans for Public Works Construction 122-2.

Concrete cross gutter and/or spandrel shall be constructed to the line, grades and design shown in plans to match existing or as directed in the field by the Engineer. The Contractor shall remove and replace any new concrete work with graffiti markings and blemishes at no additional cost to the City.

Payment for Construct Concrete Cross Gutter per SPPWC Std. Plan 122-2 shall be make at the unit price bid per Square Foot (SF) and shall include full compensation for furnishing all materials, tools, labor and equipment for the completion of the work in place as specified in this contract document and shall include final subgrade preparation, dowel reinforcement, rebars, and no additional compensation shall be allowed therefore.

Payment for one-foot wide AC Pavement strip along the curb and gutter for forming purposes shall be included in this bid item of work and no additional compensation will be allowed Bid Item No 22 – Construct Driveway Approach
This Bid Item shall also include all labor, material and equipment required to place local depression for the project as shown on the plans, as directed by the Engineer, and per these special provisions and technical specifications. All concrete work shall conform to the provisions of Section 303-5 of the Standard Specifications for Public Works Construction, Standard Plans for Public Works Construction and the Street Improvement Plans made part of these Specifications. Concrete shall be Class 520-C-2500 as specified in Section 201-1.1.2 of the Standard Specifications for Public Works Construction.

Payment for Construct Driveway Approach construction shall be made at the unit price bid per Each and shall include full compensation for furnishing all materials, tools, labor and equipment for the completion of the work in place as specified in this contract document and shall include final subgrade preparation, and no additional compensation shall be allowed therefore Bid Item No. 24 – Construct Concrete Curb Ramps
Concrete Curb Ramp shall be constructed to the line, grades and design as directed in the field by the Engineer. Existing surfaces to be joined shall be sawcut on a neat, straight line at the join location. The Contractor shall remove and replace any new concrete work with graffiti markings and blemishes at no additional cost to the City. Truncated, detectable warning surface shall be yellow and 4’ wide and 3’ long minimum. A sample of material shall be approved by the City of Montebello prior to installation. Provision and installation of truncated detectable warning surface is a part of curb ramp construction and no further compensation will be allowed.

Page 532 of 1292 ends

SP-24
Payment for concrete curb ramp shall conform to the provisions of Subsection 303-5.9 of the Standard Specifications for Public Works Construction.

Payment for Construct Concrete Curb Ramp per SPPWC Std. Plan 111-5 (Case and Type per Plan) construction shall be made at the unit price bid per Each (EA) and shall include full compensation for installing all elements of the curb ramp as detailed on the Plans, including but not limited to, detectable warning surface, inlaid cobble stone, furnishing all labor, materials, tools, equipment, backfilling, grading, compacting, forming, pouring, finishing, hauling, proper disposing, and incidentals for doing all the work involved complete in place and no additional compensation will be allowed.

Payment for removal and replacement of two-foot-wide, full depth AC Pavement strip along the curb and gutter for forming purposes shall be included in this bid item of work and no additional compensation will be allowed.

Bid Item No. 25 – Construct Detectable Warning Surface per SPPWC Std. Plan 111-5 This Bid Item shall include all labor, material and equipment required to furnish and install detectable warning surface on existing curb ramps complete in place for the project. The work shall be performed per Standard Plans for Public Works Construction, Standard Plan 111-5.

Detectable warning surface shall be YELLOW and 4’ wide and 3’ long minimum. A sample of material shall be approved by the City of Montebello prior to installation.

The orientation of the dome pattern for all panels shall be parallel with the panel edges.

At a minimum the Contractor shall adhere to the truncated dome tile manufacturer's installation requirements including proper surface preparation and protection of the work and surrounding area The manufacturer shall provide a minimum 5-year warranty, guaranteeing replacement when there is a defect in the dome shape, color fastness, sound on cane acoustic quality, or deterioration of the detectable warning surface. The warranty period shall commence on the date of acceptance.

NOTE: Detectable Warning Surface Materials shall be installed across the full width and full depth of the ramp, in conformance with SPPWC Standard Plan 111- 5 and latest ADA requirements.

Payment for Install Detectable Warning Surface per SPPWC Std. Plan 111-5 shall be made at the unit price bid per Each (EA) and shall include full compensation for furnishing all materials including, detectable warning surface, sand and dowel bars, tools, labor and equipment for the completion of the work in place as specified in this contract document and shall include final subgrade preparation, and no additional compensation shall be allowed therefore.

Page 533 of 1292 ends

SP-25
Bid Item No. 26 – Adjust to Grade, Existing Water Valve Cans and Covers Adjusting of water valve cans and covers shall be in accordance with Section 301-1.6 of the Standard Specifications. The Contractor is to contact the water utility and determine if the utility wants the Contractor to lower and raise the water valves sleeves and covers or the water utility will do so on its own. In the latter case the Contractor will not be paid for this work.

All existing water utility covers that can be lowered and raised shall be lowered prior to cold milling/removal and adjusted to finished grade by the Contractor or the Utility Owner. The Contractor shall contact the utility or substructure owner organizations to arrange for adjustment of their respective facilities a minimum of two (2) working days prior to paving operations in accordance with Section 301-1.6 of the Standard Specifications.

Adjustment of existing water valve sleeves shall also be performed after finish paving and covers are to be painted should the Utility Owner want the cover to be painted. The Utility Owner will let the City know what color is to be used.

Payment for Adjust to Grade, Water Valve Can and Cover shall be based on Each (EA) Unit Price basis and shall be considered full compensation of all costs associated with their adjustment including labor, materials, equipment
Bid Item No. 27 and 28 – Adjust to Grade, Storm Drain or Sewer Manhole Rim and Covers This Bid Item shall include all labor, equipment and materials to adjust existing sewer/storm drain manholes frames and covers within the project limits to match finished grade if required. The work shall be performed in accordance with the provisions of Subsection 301-1.6 and Subsection 302-5.8 of the Standard Specifications for Public Works Construction and per Standard Plans for Public Works Construction.

All existing covers that can be lowered and raised shall be lowered prior to cold milling/removal and adjusted to finished grade by the Contractor or by the Utility Owner for the Contractor. For utility frames and covers under the jurisdiction of Verizon, AT&T, Edison, Los Angeles County Flood Control District, Los Angeles County Sanitation Districts, and County Sewer Maintenance Districts, the Contractor shall contact these organizations to arrange for adjustment of their respective facilities a minimum of four (4) working days prior to cold milling/paving operations in accordance with Section 301-1.6 of the Standard Specifications.

The adjustment of existing manholes/vaults to finished grade shall be performed after finish paving. The removal or addition of grade rings shall be required to facilitate adjustment. Frame and covers shall be thoroughly cleaned and reset to finished grade by cutting pavement one foot outside the limits of the frame and cover. Said cut shall be neat and uniform.

Payment for Adjust to Grade, Storm Drain Manhole and Adjust to Grade, Sanitary Sewer Manhole shall be paid for at the contract unit price per Each (EA) and shall be considered full compensation for labor and furnishing and placing all forms, materials, construction and expansion joints, curing compounds and equipment to complete the construction is considered as included in

Page 534 of 1292 ends

SP-26
the price paid, and no additional compensation will be allowed therefor. Where the manhole frame and cover is performed by the utility owner, no compensation will be made to Contractor.

Bid Item No. 29– Furnish and Install Traffic Signal Loop Detectors and Connect to DLC All equipment, materials, and components for traffic detector loops and the installation thereof, shall conform to the latest edition of the Caltrans Standard Plans and Standard Specifications, Section 86, ‘Signals and Lighting”, latest edition, except as noted in the Special Provisions and on the plans. These plans and specifications are hereinafter referred to as State Standard Plans and State Standard Specifications. Copies of these documents are available from Caltrans, District 7 office at 100 S. Main Street, Los Angeles, CA 90012 or the State Offices of Caltrans at 1900 Royal Oaks Drive, Sacramento, CA 95815 (916) 455-3520.

Traffic Signal Loop Detectors shall be Type E (6’ diameter) per Caltrans Standard Plans ES-5A and ES-5B.

Contractor, as directed by City Engineer, shall remove existing loops and cut in new loops in AC areas.

Residue resulting from slot cutting/cleaning operations shall not be permitted to flow across shoulders or lanes occupied by public traffic and shall be removed from the pavement surface.

Contractor shall obtain approval from the City Engineer for exact location of new loop detector prior to final placement. Perform preliminary striping layout prior to loop detector layout.

The Contractor shall test the new detectors with a motor driven cycle, as defined in the California Vehicle Code, that is licensed for street use by the Department of Motor Vehicles. The unladed weight of the vehicle shall not exceed 220 pounds, and the engine displacement shall not exceed 100 cubic centimeters. Special features, components, or vehicles designed to activate the detector will not be permitted. The Contractor shall provide an operator who shall drive the motor driven cycle through the response or detection area of the detector at not less than three (3) miles per hour or more than seven (7) miles per hour. The detector sensor unit shall provide the required output in response to this test.

Payment for Furnishing and Installing Traffic Signal Loop Detectors and Connect to DLC shall be at the contract unit price per Each (EA). Unit Price basis installed complete and operational and shall be considered full compensation for furnishing all labor, tools, equipment, materials, coordination and incidentals, and for doing all the work involved in furnishing, installing, removals, salvaging, filling, traffic detector loops and appurtenances, providing temporary modifications to traffic signal system during construction as required, restoration work, operationally complete in place, as shown on plans, and as specified in the special provisions, and as directed by the City Engineer.

Page 535 of 1292 ends

SP-27
Bid Item No. 30 – Traffic Striping, Markings, Signing, and Curb Painting Traffic Signing, Striping, Markings, and curb painting as shown on Contract Drawings shall conform to the Standard Specifications of the State of California (latest edition), Department of Transportation, Sections No. 82, 84 and 85 (CALTRANS) and also as modified below.

Traffic stripes, pavement markings of arrows, symbols, numbers and words, shall conform to the California Department of Transportation Standard Specifications: Section 84-2 Thermoplastic Traffic Stripes and Pavement Markings, latest edition.

For existing striping or markings shown to be replaced outside of new pavement area and on existing concrete surface, Contractor shall remove by wet sandblasting only all existing striping/legends/markings. Raised dots and markings shall be removed by grinding.

Prior to project grinding and removal work, Contractor shall video all existing markings, painting and pavement devices for use in carrying out this Bid Item.

Raised pavement markers other than blue hydrant markers shall conform to the California Department of Transportation Standard Specifications Section 85, current edition, and shall be of type as called for on the plans.

For all striping and street painted legend, contractor is to use City furnished stencils available at the Public Works Yard.

The Contractor shall furnish the necessary control points for all striping and markings, and shall be responsible for the completeness and accuracy thereof to the satisfaction of the City of Montebello.

Painted and raised pavement marker removal shall conform to Section 85 of the Caltrans Standard Specifications, current edition. All residue remaining as a part of the removal operations shall be removed from the site.

Layout shall be approved, in writing, by the Engineer prior to placing Thermoplastic, curb painting and markings.

Thermoplastic Pavement striping and markings are per Caltrans Standard Plans.

Markings, as used in these Specifications, include both lines and miscellaneous markings applied to the pavement surface, painting of red curb and the installation of raised pavement markers.

Materials and installation for painted and raised pavement markers shall conform to Section 84 and 85 of Caltrans Standard Specifications, current edition.

The Contractor shall provide cat tracking for the centerline and lane lines the same day, following paving operations. Reflectorized “slurry tabs” may be used in lieu of painted cat tracking.

Page 536 of 1292 ends

SP-28
The Contractor shall refresh paint on red, yellow and blue curbs within the limit of the project and also to include all existing striping 100’ in each direction on all intersections adjacent to the proposed improvements.

Place Raised Blue Reflective for Fire Hydrant
Two-Way Blue Reflective Fire Hydrant Raised Pavement Markers installation as shown on Contract Drawings are a part of this item and shall conform to the Standard Specification Section 312 Pavement Marker Placement and Removal and shall be in accordance with the Caltrans Traffic Manual Section 6 “Markings” for each fire hydrant.

Payment for Traffic Striping/Signing/Markings shall be paid for at the contract unit price per Lump Sum (LS) and shall be considered full compensation for furnishing all labor, materials (including adhesives, glass beads, and paint), tools, equipment and incidentals necessary to perform all work, involved in, or appurtenant to the installation of pavement striping, parking stall lines, raised reflective pavement markers, painting curbs, blue markers, including removal and installation of traffic signs and posts as indicated, removal of existing delineators, complete in place for the width specified, and pavement markings of arrows, symbols, numbers and words, as required by the Project Specifications and no additional compensation will be allowed. All existing striping 100 feet in each direction on all intersections adjacent to the proposed improvements shall be restriped, remarked and repainted.

Bid Item No. 31 – Install Service Equipment Enclosure, Type III-B per Caltrans Std Plan ES-2E
Unless otherwise noted on plan(s), Contractor shall install new 120/240V modified Type III-BF service cabinet made of corrosion resistant 0.125” natural aluminum with exterior powder-coated sea-foam green (Federal Standard #14672, Cardinal paint #T007-GN23) to match the controller cabinet. All exterior hinges shall be piano-type stainless steel.

Service shall be TESCO CLASS 28-105, or approved equal. Service cabinet shall meet Eurserc 308 and the requirements of the serving utility. The service cabinet shall bear a UL508 industrial ontrol panel for service entrance equipment. The cabinet shall be completely pre-wired in the factory. Wiring shall conform to NEMA IIB standards showing external connections and external equipment. Service equipment enclosures shall conform to the following, unless otherwise shown on plan(s):

1. 120/240 volt, Type III-BF (modified) meter service, as indicated on the plan.

2. Circuit breakers shall be industrial grade, Westinghouse Quicklag C, or approved equal.

Circuit breakers required:
1 - 100 Amp 3-pole (240V signal main, lighting main)
1 - 30 Amp 1-pole (120V spare - metered)
1 - 30 Amp 1-pole (120V safety lighting - unmetered)

Page 537 of 1292 ends

SP-29
1 - 40 Amp 1-pole (120V signal circuit - metered)
1 - 15 Amp 1-pole (120V safety lighting photoelectric control circuit-unmetered) 1 - 15 Amp 1-pole (120V IISNS circuit - metered)
1 - 15 Amp 1-pole (120V IISNS photoelectric control circuit)

3. Circuit breakers and test switches shall be marked with identifying labels for each circuit breaker.

Type V photoelectric control contactor and test switch assembly shall be installed in the service cabinets. Photoelectric control contactors shall be as follows:

Luminaires - (1) 3-pole
65-amp IISNS - (1) 3-pole
65-amp
Photoelectric control assembly for the IISNS and lighting shall be installed within the circuit breaker compartment of the service cabinet enclosure, and accessible to the City after installation of electrical meter.

If service equipment cabinet designs deviates in any way from these technical provisions or the details shown on the plans, such as for a Type III-BF service cabinet, details of such deviation shall be submitted to the Engineer for review and approval before fabrication of the contract cabinet(s). If deemed necessary by the Engineer, one complete prototype cabinet shall be delivered to the Engineer for review at least (15) days before fabrication of the contract fixtures. The prototype cabinet will be returned to the Contractor, and if permitted by the Engineer, the cabinet may be installed in the work.

A shield shall be provided over the sensor openings to prevent direct light sources, such as vehicle headlights, from affecting the switching mechanism.

The Contractor shall arrange with the Southern California Edison Company for final electrical service connections in conformance with the requirements of said utility and these Technical Provisions and shall pay all required contractor-related costs and fees required by the utility. The Contractor shall notify the Engineer in writing at least (15) calendar days in advance of the date on which he desires any service connections or disconnects to be made. The Contractor shall be entitled to no extension of time or other compensation for any delay to this operation resulting from his failure to give the prescribed notification.

It shall be the Contractor’s responsibility to verify the location of, and to make arrangements for providing the necessary electrical connections for the irrigation systems. The City will be responsible for the costs from the electrical utility provider.

The work also includes coordination with Southern California Edison, installation of 3-inch PVC Schedule 40 duct, with Schedule 80 bends, from service pedestal to service feed point determined by SCE. Contractor shall provide an allowance of 100-feet of 3-inch PVC, including all associated costs of sawcuts, trenching, placement of duct, backfill and compaction, and finishing surfacing

Page 538 of 1292 ends

SP-30
in-kind to existing condition. If service feed point is an existing SCE underground vault, Contractor shall place duct to within 5-feet of vault. SCE will complete the connection to the vault.

If the service feed point is on a wood power pole, contractor shall place duct to a point 3-feet above grade.

City will pay all connection fees and sign authorization for power connection.

Service Cabinet Fabrication:

Maximum width 16” maximum, height 48” maximum, depth 17” maximum. Cabinet shall be fabricated from raw aluminum, with no protruding cabinet hood extensions.

The exterior of the cabinet shall be powder-coated sea-foam green (Federal Standard #14672, Cardinal paint #T007-GN23).

There shall be no exposed nuts, bolts, screws, rivets or other fasteners on the exterior. Cabinets shall be equipped with a BEST cylindrical locking system.

Cabinet shall have 2,000-pound stress-rated steel hasp, welded to the cabinet and door.

Distribution and control panel shall have separate hinged deadfront panels with ¼ latch and knurled knobs.

Breaker compartment shall be have a safe barrier from the control compartment. Removable back pan shall be mounted on (4) welded ¼” studs.

All circuit breakers shall be installed in a vertical position, handle up for “On” and handle down for “Off”.

Circuit breaker shall be industrial grade, Westinghouse Quicklag C, or approved equal.

All main bussing shall be UL approved copper THN cable bussing fully-rated for 125 amps.

The bid item price for Install Service Equipment Enclosure, Type III-B per Caltrans Std Plan ES-2E shall be at the contract unit price per Each (EA). Unit Price basis installed complete and operational and shall be considered full compensation for furnishing all labor, tools, equipment, materials, coordination and incidentals, and for doing all the work involved in furnishing, installing, removals, to provide electrical service(s) including coordination with SCE, PVC ducts to service feed point, all necessary hook-ups, breakers, conduit and conductors, labor, materials, tools, and equipment necessary to install the service in place as shown on plans, and no further compensation shall be allowed therefor.

Bid Item No. 32 – Median Hardscape and Landscape Planting This bid item includes the construction of “Landscape Planting” per Sections 800-1 and 801-1 – “Landscaping Materials” and “Installation” of the Standard Specifications and with these Technical Specifications and Provisions specified herein.

Page 539 of 1292 ends

SP-31
Landscaping Materials
1) Add the following to Section 800-1.1 before the first paragraph:
- Use Class “A” topsoil
2) Delete subsection of Section 800-1.2.2 in its entirety and substitute with the following:
- No manure will be allowed unless approved in advance by the Engineer. 3) Delete subsection of Section 800-1.2.5 in its entirety and substitute with the following:
- Mulch to be 1/4" to 3/4” diameter and 1/2" to 3” in length, in brown color. - All shrubs and ground cover areas shall be mulched after planting with 3 inches of mulch. Maintain a 6 inch clear “no-mulch” zone around the base of each tree and shrub.
- The Contractor shall submit one sample of mulch materials for City's review and approval. The Engineer has the right to reject all samples and request additional samples until a suitable mulch material is approved. 4) Add the following to Section 800-1.4 before the first paragraph:
- Contractor to provide 1-year guarantee for all plant materials. 5) Add the followings to Section 800-1.6:
- 800-1.6.1 General
Whenever a material or process is delineated or specified by patent, proprietary name or process, or manufacturer’s name, such specifications are used for the purpose of facilitating the description of material or process desired. Approved equals are acceptable as approved by the engineer.

Suppliers and manufacturer’s directions, specifications and recommendations will be followed in all cases where the materials used furnish directions and cover points not delineated on the Plans or in the Specifications. The specifications only indicate the quality and workmanship to be performed rather than a detailed description of the performance of the work. In the event of any discrepancies between the Plans or Specifications, the final decision as to which will be followed shall be made by the Engineer. In the event the installation is contradictory to the direction of the Engineer, the installation shall be rectified by the Contractor at no additional cost to the City.

All workmanship and materials incorporated shall be the best available grade of their respective kind. Provide a sample of each material specified.

Accepted samples may be used in the Work. Submit three (3) sets of a written list of materials as specified to the Engineer within twenty-one (21) days after award of contract. This list shall give the name, material number, and the manufacturer, and shall be accompanied by cut sheets or reproductions of catalog pages for all of the material to be installed. Approval of

Page 540 of 1292 ends

SP-32
substitutions will not relieve the Contractor from complying with the requirements of the Contract Documents, Plans and Specifications. Pay at Contractor’s sole expense for all changes caused by approved substitution which affect other items of work.
- 800-1.6.2 Herbicide
All herbicides shall be organic. Organic herbicide for weed abatement shall be Suppress EC, or approved equal.
- 800-1.6.3 Pre-emergent
Pre-emergent weed control material shall be Organic.
- 800-1.6.4 Root Barrier
Root barriers shall be furnished and installed at each tree planted adjacent to concrete and asphalt. Root Barriers must be installed vertically along the sidewalk, roadway or alley at the direction of the City. Root barriers shall extend for five feet (5’) minimum distance from the trunk of the tree in each direction.
- 800-1.6.5 Decomposed Granite
Decomposed granite shall be meeting the following criteria:
a. Uniform tan or buff color
b. From only 1 source
c. Crushed granite rock that complies with the gradation requirements shown in the following table:

Gradation Requirements
Sieve size Percentage passing
3/8" 100
No. 4 95–100
No. 8 75–80
No. 16 55–65
No. 30 40–50
No. 50 25–35
No. 100 20–25
No. 200 5–15
- 800-1.6.6 Metal Edging
Metal Edging shall be of the manufacturer, size, color, and type indicated on the Plans.
- 800-1.6.7 Dry Stream Bed
Dry Stream Bed shall be constructed with materials including river washed cobbles and weed barrier cloth.

River washed cobbles shall be from only 1 source, and be of the size, color, and type indicated on the Plans.

Page 541 of 1292 ends

SP-33
Weed barrier cloth shall be made from woven polypropylene fabric that meets the following critiers:
o Grab Tensile Strength: 600 Pounds
o Grab Elongation: 15%
o Trapezoil Tear: 75 lbs
- 800-1.6.8 Inlaid Cobble
Cobbles inlaid onto the concrete shall be from only 1 source, and be of the size, color, and type indicated on the Plans.
- 800-1.6.9 Fertilizer Tablets
21-gram 20N-10P-5K slow release fertilizer tablets as manufactured by Agriform or approved equal. Apply according to Manufacturer's instructions and as follows:
o 36” Box shall receive 36 tablets
o 24” Box shall receive 24 tablets
o 15 Gallon shall receive 10 tablets
o 5 Gallon shall receive 3 tablets
o 1&2 Gallon shall receive 2 tablets
Landscaping Installation
1) Add the following to Section 801-1
- Where existing landscaping and irrigation is to be removed, modified, or replaced due to construction or excavation, new landscaping shall be installed to match existing or as directed by the Engineer, and irrigation shall be installed and/or rerouted to ensure the irrigation system is fully operational or as directed by the Engineer. 2) Delete 1st sentence in the 4th paragraph and add the following at end of the Section 801-2.21
- WEED ABATEMENT OPERATIONS. The irrigation system, soil preparation operations, and finish grade shall be approved by the Engineer prior to weed abatement operations.

Contractor shall operate the irrigation system to keep planting areas uniformly moist for a period of two (2) weeks (14 calendar days). At the end of the two (2) week period, Contractor shall spray all visible weeds with an approved organic, nonselective, post emergent herbicide. Application rate and method shall be recommended by the manufacturer. After spraying, planting areas shall remain unwatered for a minimum of forty-eight (48) hours.

After seven (7) calendar days from the chemical application, weeds and debris shall be disposed of off-site.

Contractor shall apply spray chemicals when air currents are still; preventing drifting onto adjoining property and preventing any toxic exposure to persons whether or not they are in or near the project.
3) Add the following after the last paragraph for Section 801.2.2

Page 542 of 1292 ends

SP-34
- Fertilizing and soil amendment guidelines under agronomic soils testing shall be used for bidding purposes for planting areas, however, Contractor shall amend it as necessary per the soils test report at no additional cost to the City.

After weed abatement operations, and as determined by the Engineer, planting areas shall be scarified to a depth not to exceed one inch (1”).

Weeds and debris shall be disposed of off-site.
4) Delete 2nd paragraph and add the following after the last paragraph for Section 801-2.3 - The finish grade below adjacent paving, curbs or headers shall be 3 inches in ground or groundcover areas. Finish grading will be required in raking out/feathering spoils from planting installations.
5) Add the following after the last paragraph for Section 801-4.1 - Prior to excavation for planting or placing of stakes, locate all utilities, electric cables, conduits, underground irrigation lines, heads, valves and valve control wires, and all utility lines so that proper precautions may be taken not to damage such improvements. In the event of a conflict between utilities and plant locations, promptly notify the Engineer who will arrange for one or the other to be relocated. If contractor fails to follow this procedure it shall repair all damages resulting from the work at contractor’s sole expense. Plant materials shall be furnished in the quantities and/or spacing as shown or noted for each location, and shall be of the species, kinds, sizes, etc., as symbolized, and/or described in the Plant Legend, as indicated on the Plans. Verify all sizes and quantities on the Plans. Promptly report any discrepancy to the Engineer.
- Any plant material or any development materials specified by trade name or equal, shall be according to these Plans and Specifications. Installation and use of substitute items shall not be made until the Contractor is in receipt of written approval from the Engineer. Substitution proposals for plant material must be accompanied by written proof of non- availability within a five hundred mile radius of the project site for material originally specified and proof that material was ordered in a timely manner upon award of contract. Regularly water all nursery stock in containers and place them in a cool area protected from sun and drying winds. Do not allow plants to dry out before or while being planted. Keep exposed roots moist by means of wet sawdust, peat moss or burlap at all times during planting operations. Do not expose roots to the air except while being placed in the ground.

Wilted or diseased plants, whether in place or not, will not be accepted and shall be replaced at the Contractor’s sole expense. Moisten prepared surface immediately prior to installing plant material. Install plant material immediately after delivery to site, within 24 hours after delivering to prevent deterioration. Hand water landscaped areas immediately after installation with a minimum of 1” of water. 6) Delete 4th paragraph and replace with the following for Section 801-4.5 - In the event that underground construction work or obstructions are encountered in the planting operation, alternate locations for plant material will be selected by the City. Operation shall be done at no extra cost to the City. The following material shall be thoroughly blended and used as a backfill mix:

Page 543 of 1292 ends

SP-35
• 6 parts by volume on-site soil
• 4 parts by volume amendment 1 lbs. 16-20-0 per cubic yard of mix • 2 lbs. Iron Sulfate per cubic yard of mix
- The actual material and amounts, as determined by the agronomic soils test, shall be supplied by the Contractor at no additional cost to the City. No mixing for individual planting holes is permitted. Mix planting soil prior to backfilling and stockpile at the site. Iron sulfate shall not contact cement surfaces because severe staining could occur; repair or replace stained cement at Contractor’s sole cost.

Remove all plants from their containers and set so that, when settled, they bear the same relation to the required grade as they bore to the natural grade before being transplanted. Set the directed amount of plant fertilizer to be used with each plant on the top of the root ball so the required fertilizer amount to be used in each hole can be easily verified and approved by the Engineer. Improper planting may delay the maintenance period and extend working days causing liquidated damages. Planting holes shall be compacted with no more than 1” settlement from finished grade.

Integral Colored Concrete pavement shall be constructed to the line, grades and designs shown on the plans and as directed in the field by the Engineer. Concrete shall be Class 520-C-2500 as specified in Section 201-1.1.2 of the Standard Specifications for Public Works Construction.

Concrete pavement shall be a minimum 4” thick per the Standard Plans for Public Works Construction 112-2 and 113-2. Concrete shall be of the color and finish indicated on the Plans.

Existing surfaces to be joined shall be sawcut on a neat, straight line at the join location. The Contractor shall remove and replace any new concrete work with graffiti markings and blemishes at no additional cost to the City.

Payment for Median Hardscape and Landscape Planting shall be per the contract Lump Sum (LS) price bid as shown on the Bid Schedule. Payment shall include full compensation for furnishing all labor, tools, materials, equipment, and work involved including, but not be limited to soil preparation, fertilizers, amendments, weed control, finish grading, soil testing, backfill materials, furnishing and installing plant materials, bark mulch, and cleanup. No additional compensation will be allowed therefore.

Contractor shall provide a schedule of values for the following items included in this lump sum price bid:

Item Unit Quantity
Tree - 24" Box EA 38
Shrub - 1 Gal EA 1000
Root Barrier LF 425
Dry Stream Bed (Cobble and Weed Barrier) CY 26
Decomposed Granite (Included Path Fines and Aggregate underneath) SF 5000 Inlaid Cobble-Non walkable surface SF 870
Metal Edging LF 3225

Page 544 of 1292 ends

SP-36
Imported Top Soil with Amendment (2' Depth) CY 1570
Mulch (3" Depth) CY 150
Construct Integral Colored Concrete SF 4050
Bid Item No 33 – Irrigation System
This work includes the construction of “Irrigation System” per Sections 800-2 and 801-5 – “Irrigation System Materials” and “Irrigation System Installation” of the Standard Specifications and with these Technical Specifications and Provisions specified herein.

Irrigation Materials
1) Delete 2nd paragraph from Section 800-2.1.3 and replace with the following:
- All pressure supply lines downstream of the strainer assembly unit shall be Schedule 40 solvent weld PVC 1-1/2” or smaller and Class 315 solvent weld PVC for 2” or larger. Piping shall conform to ASTM 1785. All non-pressure lines downstream of the remote control valve shall be Schedule 40 solvent weld PVC conforming to ASTM D1785. Pipe shall be marked continuously with manufacturer's name, nominal pipe size, schedule or class, PVC type and grade, National Sanitation Foundation approval, Commercial Standards designation, and date of extrusion.

All plastic pipe shall be extruded of an improved PVC virgin pipe compound in accordance with ASTM D2241 or ASTM D1785.
- All solvent weld PVC fittings shall be standard weight Schedule 80 and shall be injection molded of an improved virgin PVC fitting compound. Slip PVC fittings shall be the "deep socket" bracketed type. Threaded plastic fittings shall be injection molded. All tees and ells shall be side gated.
- All fittings shall conform to ASTM D2466. All threaded nipples shall be standard weight Schedule 80 with molded threads and shall conform to ASTM D1785. - All solvent cementing of plastic pipe and fittings shall be a two-step process, using primer and solvent cement applied per the manufacturer's recommendations. Cement shall be of a fluid consistency, not gel-like or ropy. Solvent cementing shall be in conformance with ASTM D2564 and ASTM D2855. When connection is plastic to metal, female adapters shall be hand tightened, plus one turn with a strap wrench.

Joint compound shall be non-lead base Teflon paste, tape, or approved equal. 2) Delete entire Section 800-2.2.2 and replace with the following:
- 800-2.2.2 Gate Valves and Ball Valves
Gate valves and Ball Valves shall be of the manufacturer, size, and type indicated on the Plans.
3) Delete entire Section 800-2.2.4 and replace with the following:

Page 545 of 1292 ends

SP-37
- 800-2.2.4 Remove Control Valves
Automatic control valves shall be of the manufacturer, size, and type indicated on the Plans. Automatic control valves shall be electrically operated. Drip zone valves shall be accompanied with pressure regulators and filters per the manufacturer. 4) Add the following sections:
- 800-2.2.8 Automatic Flush Valves
Automatic Flush Valves shall be of the manufacturer, size, and type indicated on the Plans.
- 800-2.2.9 Air Release Valve Assemblies
Air Release Valve Assemblies shall be of the manufacturer, size, and type indicated on the Plans.
- 800-2.5 Deep Water Bubbler Assemblies
Deep Water Bubbler Assemblies shall be of the manufacturer, size, and type indicated on the Plans.
- 800-2.6 Dripline Irrigation System
Dripline Irrigation System, including tubings, air/vacuum relief valve, and automatic flush valve shall be of the manufacturer, size, and type indicated on the Plans. - 800-4 Warranties
All materials supplied for this project shall be new and free from any defects. All defective materials shall be replaced immediately at no additional cost to City. After award of contract and before any irrigation system materials are delivered to the job site, submit to the Engineer a complete list of all irrigation systems, materials, or processes proposed to be furnished and installed as part of this Contract. Show manufacturer's name and catalog number for each item, furnish complete catalog cuts and technical data, furnish the manufacturer's recommendations as to the method of installation. No substitutions will be allowed without prior written acceptance by the Engineer. Manufacturer's warranties shall not relieve the Contractor of liability under the guarantee. Such warranties shall only supplement the guarantee. If the Contractor wishes to substitute any equipment or materials for equipment or materials listed on the irrigation Drawings and Specifications, it may do so by providing the following information to the Engineer for approval:
• Provide a written statement indicating the reason for making the substitution. • Provide catalog cut sheets, technical data, and performance information for each substitute item.
• Provide in writing the difference in installed price if the item is accepted.

The contractor shall furnish all materials as specified in the plans and specifications and turn over a fully functional irrigation system complete with programming as coordinated by the City and accommodating for the new irrigation controller within the new landscape.

Page 546 of 1292 ends

SP-38
Additionally, the contractor shall be responsible for repairing any landscape damaged or removed for the purpose of installation of the irrigation.

All irrigation materials provided and installed shall be specifically designed and manufactured for use within reclaimed irrigation systems.

Irrigation Installation
1) Add the following after the last paragraph for Section 801-5.1 - Prior to all work of this Section, carefully inspect the installed work of all other trades and verify that all such work is complete to the point where this installation may properly commence. Verify that irrigation system may be installed in strict conformance with all pertinent codes and regulations, the original design, the referenced standards, and the manufacturer's recommendations. In the event of discrepancy, immediately notify the Engineer.

Do not proceed with installation in areas of discrepancy until all discrepancies have been resolved. Before starting work, carefully check all grades to determine that work may safely proceed, keeping within the specified material depths with respect to finish grade.

The Engineer will approve final grades before work on this Section will be allowed to begin. Make all necessary measurements in the field to ensure precise fit of items in accordance with the original design. Coordinate the installation of all irrigation materials with all other work.

All scaled dimensions are approximate. Check and verify all size dimensions prior to proceeding with work under this Section. Exercise extreme care in excavating and working near existing utilities. Repair damages to utilities, which are caused by Contractor’s operations or neglect, at no additional cost to City. Prior to installation, stake out all pressure supply lines, routing and location of sprinkler heads, valves, and automatic controller. Layout irrigation system and make minor adjustments required due to differences between site and Drawings. Where piping is shown on Drawings under paved areas, but running parallel and adjacent to planted areas, install the piping in the planted areas. Connections to, or the installation of, the water supply shall be at the locations shown on the Drawings.

Minor changes caused by actual site conditions shall be made at no additional expense to the City.

Existing irrigation equipment to be replaced including valves, spray heads, and rotors shall be salvaged and delivered to the City.

Verify and be familiar with the locations, size and detail of points of connection provided as the source of water and connection to the irrigation system. Irrigation design is based on the available static water pressure shown on the Drawings. Verify static water pressure on the project prior to the start of construction. Should a discrepancy exist, notify the Engineer’s authorized representative prior to beginning construction. Prior to cutting into the soil, locate all cables, conduits, sewer septic

Page 547 of 1292 ends

SP-39
tanks, and other utilities as are commonly encountered underground and take proper precautions not to damage or disturb such improvements. If a conflict exists between the obstacles and the proposed work, promptly notify the Engineer who will arrange for relocations. Proceed in the same manner if a rock layer or any other such conditions are encountered. Protect all existing utilities and features to remain on and adjacent to the project site during construction. Repair, at its sole cost, all damage resulting from its operations or negligence.

The Agency Representative shall have, at all times, safe access to the Work. Where the Specifications require work to be tested by the Contractor, it shall not be covered over until accepted by the Engineer. Notify the Engineer, a minimum of 48 hours in advance of where and when the work is ready for. Should any work be covered without testing or acceptance, it shall be, if so ordered, uncovered at the Contractor's sole expense. Inspections will be required for the following at a minimum:
o System layout
o Pressure test irrigation main line (Six hours at 125 psi) lateral lines (2 hours at 100 psi).
o Coverage test of irrigation system
o Final inspection prior to start of maintenance period o Final acceptance
Work that fails testing and is not accepted will be re-tested. Hourly rates and expenses of the Engineer for re-inspection or re-testing will be paid by the Contractor at no additional expense to City.

Use all means necessary to protect irrigation system materials before, during, and after installation and to protect the installation work and materials of all other trades. In the event of damage, immediately make all repairs and replacements necessary to the acceptance of the Engineer and at no additional cost to the City. Exercise care in handling, loading, unloading, and storing plastic pipe and fittings under cover until ready to install. Transport plastic pipe only on a vehicle with a bed long enough to allow the pipe to lay flat to avoid undue bending and concentrated external load. Dispose of waste, trash, and debris in accordance with applicable laws and ordinances and as prescribed by authorities having jurisdiction. Do not bury waste material and debris on the site. Burning of trash and debris will not be permitted. Remove and dispose of rubbish and debris generated by his work and workmen at frequent intervals or when ordered to do so by the Engineer. At the time of completion the entire site will be cleared of tools, equipment, rubbish and debris which shall be disposed of off-site in a disposal area that is fully and legally licensed.

Temporary Repairs: The City reserves the right to make temporary repairs as necessary to keep the irrigation system in operating condition. The exercise of this right by the City shall not relieve the Contractor of his responsibilities under the terms of the guarantee as herein specified.

Supply the following items:

Page 548 of 1292 ends

SP-40
o Two (2) wrenches for disassembly and adjustment of each type of sprinkler head used in the irrigation system.
o Two (2) 30-inch sprinkler keys for manual operation of control valves. o One (1) valve box cover key.
o Four (4) extra sprinkler heads of each size and type. o 250 feet of additional drip line and 100 feet blank roll. o 200 drip line stapes.

The above equipment shall be turned over to the Engineer at the final inspection.

At the time of the pre-maintenance period inspection, the Engineer and governing agencies will inspect the work and, if not accepted, prepare a list of items to be completed by the Contractor. At the time of the post-maintenance period or final inspection the work will be re-inspected and final acceptance will be in writing by the Engineer. The City Engineer shall have final authority on all portions of the work.

Irrigation Pipeline Installation
1) Add the following after the last paragraph for Section 801-5.3.1 - Trenching excavation shall follow layout indicated on Drawings to the depths below finished grade and as noted. Where lines occur under paved areas, these dimensions shall be considered below subgrade. Provide minimum cover of 24 inches on pressure supply lines. Provide minimum cover of 24 inches for control wires. Provide minimum cover of 12 inches for non-pressure lines unless lines are designated as “ON GRADE” per the plans. Backfill material on all lines shall be the same as adjacent soil free of debris, litter, and rocks over 1/2 inch in diameter.

Backfill shall be tamped in 4-inch layers under the pipe and uniformly on both sides for the full width of the trench and the full length of the pipe. Backfill materials shall be sufficiently damp to permit thorough compaction, free of voids. Backfill shall be compacted to 90% relative compaction and shall conform to adjacent grades.

Flooding in lieu of tamping is not allowed. Under no circumstances shall truck wheels be used to compact backfill. Provide sand backfill a minimum of 6 inches over and under all piping under paved areas.

Piping under existing pavement may be installed by jacking, boring, or hydraulic driving. No hydraulic driving is permitted under asphalt pavement. Cutting or breaking of existing pavement is not permitted. Carefully inspect all pipe and fittings before installation, removing dirt, scale, burrs, and reaming. Install pipe with all markings up for visual inspection and verification.

Remove all dented and damaged pipe sections. All lines shall have a minimum clearance of 6 inches from each other and 12 inches from lines of other trades.

Parallel lines shall not be installed directly over each other. In solvent welding, use only the specified primer and solvent cement and make all joints in strict conformance with the manufacturer's recommended methods including wiping all excess solvent from each weld. Allow solvent welds at least 15 minutes setup time

Page 549 of 1292 ends

SP-41
before moving or handling and 24 hours curing time before filling. PVC pipe shall be installed in a manner, which will provide for expansion and contraction as recommended by the pipe manufacturer. Center load all plastic pipe prior to pressure testing. All threaded plastic-to-plastic connections shall be assembled using Teflon tape or Teflon paste. For plastic-to-metal connections, work the metal connections first. Use a non-hardening pipe dope an all threaded plastic-to-metal connections, except where noted otherwise. All plastic-to-metal connections shall be made with plastic female adapters.
2) Add the following after the last paragraph for Section 801-5.4 - Automatic control valves, and gate valves shall be installed in the approximate locations indicated on the Drawings. Valves shall be installed in shrub areas whenever possible. Install all valves as indicated in the detail Drawings. Valves to be installed in valve boxes shall be installed one valve per box. 3) Add the following after the last paragraph for Section 801-5.7.3 - Irrigation dripline to be installed per plans. The contractor shall be responsible for making field adjustments to provide proper drip coverage. Install drip line on finish grade per manufacturer’s instructions. Immediately after installing drip line, flush system to the satisfaction of the Engineer. Drip line coverage to be observed, tested, and approved by the Engineer prior to burying with mulch. Notify the Engineer a minimum of 48 hours in advance where and when the work is ready for testing. 4) Add the following after the last paragraph for Section 801-5.7.4 - Furnish all materials and perform all work required to correct any inadequacies of coverage due to deviations from the Plans, or where the system has been willfully installed as indicated on the Drawings when it is obviously inadequate, without bringing this to the attention of the Engineer. This test shall be accepted by the Engineer and accomplished before starting any planting. Final inspection will not commence without record Drawings as prepared by the Contractor. During the maintenance period adjust and maintain the irrigation system in a fully operational condition providing complete irrigation coverage to all intended plantings. Clean-up shall be made as each portion of the work progresses. Refuse and excess dirt shall be removed from the site, all walks and paving shall be broomed, and any damage sustained on the work of others shall be repaired to original conditions.

Payment for Irrigation System shall be per the contract Lump Sum (LS) price bid as shown on the Bid Schedule. Payment shall include full compensation for furnishing all labor, tools, materials, equipment, and work involved including, but not be limited to pipes, fittings, sprinklers, valves, automatic control valves, controllers, valve boxes, drain valves, hose bib valves, operating wrenches, riser assemblies, fertilizer injection system, trenching, direct burial wires, electrical connections, wiring and other appurtenances, piping, connections, coordination, testing, cleanup, temporary irrigation, and adjustments necessary for a complete operating system, ready for immediate use upon completion. No additional compensation will be allowed therefore.

Page 550 of 1292 ends

SP-42
Contractor shall provide a schedule of values for the following items included in this lump sum price bid:

Item Unit Quantity
Irrigation Controller (installed inside of Type III-BF enclosure) 16 station
EA 1
Irrigation Controller (installed inside of Type III-BF enclosure) 8 station
EA 1
Water Meter EA 2
Reduced Pressured Backflow Preventer EA 2
Master Valve EA 2
Flow Sensor EA 2
Supply Line - Copper Type K LF 25
Irrigation Mainline LF 2565
Irrigation Sleeves LF 1152
Lateral Sch 40 PVC LF 2065
Irrigation Conduit and Wire LF 2565
Remote Control Valve Assembly EA 5
Drip Remote Control Valve Assembly EA 9
Deep Water Bubblers EA 76
Subsurface Inline Drip Tubing SF 17500
Ball Valve EA 7
Splice Box EA 7
Air Relief Valve EA 9
Automatic Flush Valve EA 9
Bid Item No. 34 – Plant Establishment and Maintenance Period (90 Days) This work includes “Maintenance and Plant Establishment” per Section 801-6 of the Standard Specifications and with these Technical Specifications and Provisions specified herein.
1) Delete the entire Section 801-6 and replace with the following:
- Landscape maintenance and plant establishment period shall be a minimum of ninety (90) days after “Date of Acceptance of Installation” of all planting areas. Request in writing from the Engineer, notification of the date of the start of the maintenance and planting establishment period. At the acceptance of all planting areas, request in writing from the Engineer notification of the date of the completion of the maintenance period. The maintenance period shall not officially begin or end without written notification from the Engineer. Construction fencing

Page 551 of 1292 ends

SP-43
shall remain until after the maintenance period is complete or as directed by the Engineer. Maintain all planted areas on a continuous basis as they are completed during the progress of the work and during the establishment and maintenance period, and shall continue to maintain them until final acceptance in accordance with the following:
• Water, weed, fertilize, edge, prune, spray as necessary to promote a healthy growing condition. Maintain lawn at a mowing height recommended by the city. All planted areas shall be kept free of debris and weeds. Keep project neat and attractive throughout the maintenance period.
• Apply organic herbicides for weed control, as needed or directed by City, in accordance with manufacturer’s instructions and applicable laws and regulations.

Organic pre-emergent herbicide shall be required in all planter, shrub and ground cover areas. Remedy damage resulting from weed control. • Adjust the irrigation system to sufficiently saturate root zone without rotting trees, shrubs, and ground cover.
• Repair or replace any damaged item caused by vehicles, vandals, rabbits, rodents, bicycles, or foot traffic during the maintenance period. • Fertilize with “Organic/JTM Complete” at 30 lbs./1,000 s.f. at the beginning and end of the maintenance period (twice) or as indicated by the agronomic soils test.

All inspections herein specified shall be made by the City. Request inspection at least forty-eight (48) hours in advance of the time the inspection is required.

Inspection is required for, and not necessarily limited to, the following parts of the work:
• Incorporation of soil amendments and fine grading.
• Prior to digging plant pits for shrubs.
• During backfilling of plant pits with amended backfill. • Final inspection at the end of the maintenance period. • Irrigation Inspection / Coverage Test prior to planting.

Payment for Plant Establishment and Maintenance Period (90 Days) shall be per the contract Lump Sum (LS) price bid as shown in the Bid Schedule. Payment shall include full compensation for furnishing all labor, tools, materials, equipment, and work involved to complete this work. No additional compensation will be allowed therefore.

Page 552 of 1292 ends

SP-44

SPECIAL PROVISIONS
PART 4 – EXISTING IMPROVEMENTS
FOR

PAVING THE WAY PROGRAM

MONTEBELLO BLVD
(FROM LOS ANGELES AVE TO LINCOLN BLVD)
C.P. No. 888

IN THE CITY OF MONTEBELLO
PART 4 – EXISTING IMPROVEMENTS
The work required to be performed for the completion of the Project shall be performed in accordance with the Standard Specifications for Public Works Construction (SSPWC), latest Edition, in so far as the same applies to the Project, the Standard Plans and the Contract Documents.

For purposes of this Project, Part 4 of the SSPWC, is amended, as follows:

SECTION 400 – PROTECTION AND RESTORATION
400-1 GENERAL.

The second paragraph of Subsection 400-1 of the Standard Specifications is hereby deleted and replaced with the following:

The Contractor shall relocate, repair, replace or re-establish all existing improvements within the project limits which are not designated for removal (e.g., curbs, sidewalks, driveways, fences, walls, sprinkler systems, signs, utility installations, pavements, structures, etc.) which are damaged or removed as a result of the operations or as required by the Plans and Specifications. The Contractor shall make the effort to repair all sprinklers, pipe, etc by the end of the day.

Where existing traffic striping, pavement markings, and curb markings are damaged or their reflectivity reduced by the Contractor’s operations, such striping or markings shall also be considered as existing improvements and the Contractor shall repaint or replace such improvements. Prior to start of construction, Contractor and City Inspector shall visit and survey the site, and agree on locations outside the work limits and adjacent to it, and along truck routes where the traffic striping, pavement markings, and curb markings are in good condition prior to start of construction, and locations where the markings are faded prior to start of construction.

Contractor shall restripe or clean to the satisfaction of the City, all pavement markings and striping in the vicinity of the project and on truck routes damaged and soiled due the Contractor’s work.

Page 553 of 1292 ends

SP-45
Relocations, repairs, replacements or re-establishments shall be at least equal to the existing improvements and shall match such improvements in finish and dimensions unless otherwise specified.

All existing improvements including Fence/Wall/Gates/Plants/Grass/Trees/Irrigation Systems/etc. that might be damaged during construction should be videotaped and it is Contractor’s responsibility to protect all existing adjacent features such as landscaping, irrigation system, property’s fence/wall/gates, curb and gutter, pull boxes, utility boxes, and etc. in place per section 400-1 of Standard Specifications for Public Works Construction. All damages to these items shall be fixed to the satisfaction of the City of Montebello without any additional compensation.

All costs to the Contractor for protecting, removing, restoring, relocating, repairing, replacing, or re-establishing existing improvements shall be included in the bid. 400-2 PERMANENT SURVEY MARKERS.

The following is added this this subsection of the Standard Specifications:

The Contractor shall be responsible for the protection and preservation of existing permanent survey monuments and benchmarks during construction. Damaged or lost monuments and benchmarks shall be restored to existing condition by a Registered Civil Engineer or a Land Surveyor licensed by the State of California at no increase in cost to the City.

The Contractor, at its own expense, shall employ a qualified surveyor to perform all survey work required for the completion of the project as specified in the plans and these specifications, comply with the requirements of Section 8771 of the Land Surveyors Act as amended and submit the documents from the County Surveyor as proof of compliance to the City of Montebello. 400-3 PAYMENT
This subsection of the Standard Specifications is hereby deleted and replaced with the following:

No separate or additional payment will be made for 1) protection of existing improvements, 2) restoration of existing improvements and 3) permanent survey markers. All costs to the Contractor for protecting, removing, restoring, relocating, repairing, replacing, or re-establishing existing improvements shall be included in the bid.

SECTION 402 – UTILITIES
402-1 LOCATION.
402-1.1 General.

The following is hereby added to this subsection of the Standard Specifications:

Page 554 of 1292 ends

SP-46
The location and existence of any underground utility or substructure was obtained from a search of available records. No guarantee is made or implied that the information is complete or accurate.

It shall be the Contractor’s responsibility alone to determine the exact location of underground utilities or substructures of every nature and to protect them from damage. The Contractor shall excavate and expose all high-risk underground facilities. The Contractor shall notify the owners of all known utilities and substructures as set forth in the Specifications.

NOTIFICATION
The Contractor shall notify the City of Montebello and the owners of all utilities and substructures not less than 48 hours (2 working days) prior to starting construction. The following list of names and telephone numbers is intended for the convenience of the Contractor and is not guaranteed to be complete or correct:

Central
Basin
MWD
Isabelle
Guido
6252 Telegraph Rd
Commerce CA 90040
(323) 201-5541
[email protected]
Chevron
Environmental
Management
Company
Allen Just 18401 Von Karman Ave
Ste 300
Irvine, CA 92612
(714) 508-2677
[email protected]
Crimson
Pipeline LP
Shannon
Lovrien
3760 Kilroy Airport Way
Suite 300
Long Beach, CA 90806
(562) 285-4107
MCI
(Verizon
Business)
400 International Pkwy
Richardson, TX 75081
[email protected]
Montebello
Land & Wtr
Korey 1600 W Beverly Bl
Montebello, CA 90640
[email protected]
Crown Castle -

LA & VEN
Fiber Dig 1500 Corporate Dr
Canonsburg, PA 15317
(800) 654-3110
[email protected]
Redflex
Traffic
Systems
5651 W Talavi Blvd
Suite 200
Glendale, AZ 85306
(800) 568-8405
[email protected]
SoCalGas
Distribution
Belvedere
Jason Sum 701 N Long Beach Blvd
Compton, CA 90221
(310) 687-2011
ComptonUtilityRequest@semprautilities
.com
[email protected]
San Gabrial
Vally Wtr
Company
Kailyn Phu 11142 E Garvey Ave
El Monte, CA 91733
(626) 448-6183
[email protected]

Page 555 of 1292 ends

SP-47
Spectrum -
Irwindale
David
Scharrer
4781 Irwindale Ave
Irwindale, CA 91706
626-430-3522
[email protected]

SCE Trans
Telecom,
Utiliquest for
SCE Dist -
Metro East &
West Reg
Engineering 14005 S Benson Ave
Chino, CA 91710
[email protected]
CITY POLICE AND FIRE DEPARTMENT Police: (323) 887-1313
Fire: (323) 887-4510
UNDERGROUND SERVICE ALERT (800) 422-4133 Tel
(909) 808-8101 Fax
TRASH COLLECTORS – ATHENS DISPOSAL (626) 336-6100
STREET SWEEPING – NATIONWIDE (562) 860-0604
MONTEBELLO UNIFIED SCHOOL DISTRICT (323) 887-7900
MONTEBELLO TRANSIT (323) 558-1625

EMERGENCY INFORMATION
The names addresses and telephone numbers of the Contractor and subcontractors, or their representatives, shall be filed with the Engineer and the City Police Department prior to beginning work.
402-1.2 Payment
Payment for provisions under section 402-1 of the Standard Specifications shall be considered included in the various items of the work. No separate payment will be authorized.

Page 556 of 1292 ends

SP-48

SPECIAL PROVISIONS
PART 6 – TEMPORARY TRAFFIC CONTROL
FOR

PAVING THE WAY PROGRAM

MONTEBELLO BLVD
(FROM LOS ANGELES AVE TO LINCOLN BLVD)
C.P. No. 888

IN THE CITY OF MONTEBELLO
PART 6 – TEMPORARY TRAFFIC CONTROL
The work required to be performed for the completion of the Project shall be performed in accordance with the Standard Specifications for Public Works Construction (SSPWC), latest Edition, in so far as the same applies to the Project, the Standard Plans and the Contract Documents.

For purposes of this Project, Part 6 of the SSPWC, is amended, as follows:

PART 6 – TEMPORARY TRAFFIC CONTROL
SECTION 600 – ACCESS
600-1 GENERAL.

The following is added this this subsection of the Standard Specifications:

The Contractor shall notify the occupants of all affected properties in writing at least forty-eight hours (2 working days) prior to any temporary obstruction of access. 600-2 VEHICULAR ACCESS.

The following is added this this subsection of the Standard Specifications:

Vehicular access to the property line shall be maintained except as required for construction for a reasonable period of time. No overnight closure of any driveway will be allowed except as permitted by the Engineer.

In cases where driveways require replacement. Where a property has two driveways, only one driveway at a time can be closed for replacement. Where a single driveway to a property has a considerable width, half of the driveway is to be closed, worked on and reopened for usage before the other half of the driveway can be worked on.

Page 557 of 1292 ends

SP-49
All driveways have to be open for access during project non-construction hours and days which may require use of plating and other devices or methods.

No driveway can be worked on until the owner/tenant has been informed in writing with five (5) working days’ notice of the scheduled work and has agreed to the planned schedule of the Contractor.
600-3 PEDESTRIAN ACCESS.

The following is added this this subsection of the Standard Specifications:

Under situations of sidewalk closure to pedestrians, the Contractor shall post advance notice on barricades to direct pedestrian to use the sidewalk on the opposite side of the street or the Contractor may elect to provide continuous K-rail in the curb lane to allow pedestrians to walk in the curb lane behind the K-rail. Any and all devices such as plates, barricades, K-rails and notices shall be continuously maintained for pedestrian and vehicle safety. No curb lanes shall be closed during non-working days of the week. Appropriate advance warning signs shall be continuously maintained as needed during the project. All such devices, warning signs and interruptions of normal vehicle lanes, parking lanes and pedestrian walkways shall be shown on the Traffic Control Plan for advance approval by the City.

SECTION 601 – TEMPORARY TRAFFIC CONTROL FOR CONSTRUCTION AND

MAINTENANCE WORK ZONES
601-1 GENERAL.

The following is added this this subsection of the Standard Specifications:

At least one twelve-foot-wide traffic lane shall be provided for each direction of travel on all arterial streets at all times except as permitted by the Engineer. With previous authorization from the City, the Contractor can provide one traffic lane on a single direction on residential streets, during construction hours.

Clearances from traffic lanes shall be five feet to the edge of any excavation and two feet to the face of any curb, pole, barricade, delineator, or other vertical obstruction.

Any striped roadway shall be delineated by the Contractor with temporary raised reflective markers when it is to be left un-striped overnight.

Street closures will not be allowed except as specifically permitted by the Engineer. 601-2 TEMPORARY TRAFFIC CONTROL PLAN (TCP)
601-2.1 General
The following is added this this subsection of the Standard Specifications:

Page 558 of 1292 ends

SP-50
At the Pre-Construction meeting, the Contractor shall submit to the Engineer a detailed traffic control plan per section 601 of the Standard Specifications and construction sequencing for the project. The plan shall include drawings as necessary to clearly outline how traffic flow and pedestrian walkways will be handled during the course of construction and where detour and advance notice signs will be posted.

Traffic control plan shall be approved in writing by the City Engineer prior to construction starts.

The plan shall be prepared per latest edition of California Manual on Traffic Control Devices (CA-MUTCD).

Traffic lane transitions shall not be sharper than a taper of thirty to one.

Temporary striping will not be allowed unless specifically permitted by the Engineer. The Contractor shall prepare any plans that may be required for temporary striping to the satisfaction of the Engineer. In no event will temporary striping be allowed to remain on finish pavement surfaces.

In no case shall traffic be diverted from the existing traveled way without prior approval of the City Engineer.

The contractor shall include in his Traffic Control Plan use of lighted message boards to notify traffic of project and any changes in vehicle or pedestrian travel routes.

If the Contractor shall fail to provide and install any of the signs or traffic control devices ordered by the Engineer, the Engineer may either stop the work or cause such signs or traffic control devices to be placed by others and charge the cost therefor against the Contractor and deduct same from the next progress payment.
601-2.2 Payment
Payment for provisions under section 601 of the Standard Specifications shall be considered included under the bid item for traffic control. No separate payment will be authorized

Page 559 of 1292 ends

APPENDIX “A”

STANDARD PLANS

Page 560 of 1292 ends

CITY OF MONTEBELLO

PAVING THE WAY PROGRAM

MONTEBELLO BLVD
(FROM LOS ANGELES AVE TO LINCOLN BLVD)
C.P. No. 888

LIST OF STANDARD PLANS
Plan No. Description
Standard Plans for Public Works Construction:

SPPWC 110-2 Driveway Approaches
SPPWC 111-5 Curb Ramp
SPPWC 112-2 Curb and Sidewalk Joints
SPPWC 113-2 Sidewalk and Driveway Replacement
SPPWC 120-2 Curb and Gutter – Barrier
SPPWC 122-2 Cross and Longitudinal Gutters
SPPWC 132-3 Concrete Pavement Replacement
SPPWC 133-3 AC Pavement Replacement
SPPWC 134-2 Concrete Pavement Joint Details
SPPWC 205-2 Sewer Manhole Adjustment
SPPWC 206-2 Manhole Raising Rings
SPPWC 313-4 Local Depression at Catch Basin
CALTRANS:

A20A, A20B, A20D, A20E, A20F, and A20G Pavement Markers and Traffic Lines A24A, A24B, A24C, A24D, A24E, A24F, A24G, A24H Pavement Markings, Arrows, Words, Symbols, Numerals, Limits &
Crosswalk Lines
A90B Accessible Parking On-Street
ES-5A and ES-5B Electrical Systems (Loop Detectors)

Page 561 of 1292 ends
Page 562 of 1292 ends
Page 563 of 1292 ends
Page 564 of 1292 ends
Page 565 of 1292 ends
Page 566 of 1292 ends
Page 567 of 1292 ends
Page 568 of 1292 ends
Page 569 of 1292 ends
Page 570 of 1292 ends
Page 571 of 1292 ends
Page 572 of 1292 ends
Page 573 of 1292 ends
Page 574 of 1292 ends
Page 575 of 1292 ends
Page 576 of 1292 ends
Page 577 of 1292 ends
Page 578 of 1292 ends
Page 579 of 1292 ends
Page 580 of 1292 ends
Page 581 of 1292 ends
Page 582 of 1292 ends
Page 583 of 1292 ends
Page 584 of 1292 ends
Page 585 of 1292 ends
Page 586 of 1292 ends
Page 587 of 1292 ends
Page 588 of 1292 ends
Page 589 of 1292 ends
Page 590 of 1292 ends
Page 591 of 1292 ends
Page 592 of 1292 ends
Page 593 of 1292 ends
Page 594 of 1292 ends
Page 595 of 1292 ends
Page 596 of 1292 ends
Page 597 of 1292 ends
Page 598 of 1292 ends
Page 599 of 1292 ends
Page 600 of 1292 ends
Page 601 of 1292 ends
Page 602 of 1292 ends
Page 603 of 1292 ends
Page 604 of 1292 ends
Page 605 of 1292 ends
Page 606 of 1292 ends

APPENDIX “B”

DEPARTMENT OF INDUSTRIAL RELATIONS (DIR)

CONTRACTOR REGISTRATION NUMBER FORM

Page 607 of 1292 ends

Department of Industrial Relations (DIR) Contractor
Registration Number
Beginning July 1, 2014, contractors must register with the Department of Industrial Relations (DIR) before bidding on public works contracts in California. For more information, please refer to this section of the Department of Industrial Relations Website:
http://www.dir.ca.gov/Public-Works/PublicWorks.html.

Per this requirement, provide the following information:
______________________________________________________________________ Contractor Name
Contractor Department of Industrial Relations Registration Number:
______________________________________________________________________ Expiration Date of Registration Number
*(THIS FORM MUST BE SUBMITTED WITH THE SEALED BID) *

Page 608 of 1292 ends