GP-13
CONTRACTOR shall carry and maintain worker’s compensation in the amount of $1,000,000 as required by the California Labor Code for all persons employed directly or indirectly in connection with this Contract by CONTRACTOR. To the extent that CONTRACTOR utilizes any subcontractor for the performance of any part of the work under this Contract, CONTRACTOR shall require and assure that such subcontractor also carry and maintain worker’s compensation as required by the California Labor Code for all persons directly or indirectly in connection with this Contract.
5-4.4 Auto Liability Insurance
This subsection of the Standard Specifications is hereby replaced by the following CONTRACTOR shall carry and maintain Automobile Liability Insurance which provides a minimum coverage of at least $5,000,000 per accident for bodily injury and property damage.
The following subsection(s) are hereby added to Section 5-4 of the Standard Specifications 5-4.5 Additional Insureds
The CITY, its officers, agents and employees must be named as additional insureds or as additional loss payees in all insurance policies required by this Contract. An endorsement to this effect shall be delivered to CITY prior to the commencement of any work. Satisfaction of any deductible requirement shall be the responsibility of CONTRACTOR. Such insurance shall be primary and noncontributory with any other insurance maintained by the CITY. 5-4.6 Notice of Cancellation
CONTRACTOR agrees to oblige its insurance agent or broker and insures to provide CITY with a thirty (30) day notice of cancellation (except for nonpayment for which a ten (10) day notice is required) or nonrenewal of coverage for each required coverage. 5-4.7 Severability Clause
Each of the policies of insurance shall contain a clause substantially as follows:
The insurance afforded by this policy applies separately to each insured against whom a claim or suit is made, or suit is brought, except with respect to the limit of the insurer's liability.
5-4.8 Qualifications of Insurer
All policies of insurance shall be issued by an insurance company acceptable to CITY and authorized to issue said policy in the State of California. 5-4.9 Approval of Insurer
The insurance carrier providing the insurance shall be chosen by CONTRACTOR subject to approval by CITY, provided that such approval shall not be unreasonably withheld.
GP-14
5-4.10 Payment of Premiums
All premiums on insurance policies shall be paid by CONTRACTOR making payment, when due, directly to the insurance carrier, or in a manner agreed to by CITY. 5-4.11 Evidence of Insurance and Claims
CONTRACTOR shall provide certificates of insurance to CITY as evidence of insurance coverage required herein, along with a waiver of subrogation endorsement for workers’ compensation. The CITY’s Risk Manager must approve insurance certificates and endorsements prior to commencement of performance. Current certification of insurance shall be kept on file with the CITY at all times during the term of this Contract. The CITY reserves the right to require complete, certified copies of all required insurance policies, at any time. 5-7 SAFETY
5-7.1 Work Site Safety
5-7.1.1 General
The following is hereby added to this subsection of the Standard Specifications:
It is part of the service required of the Contractor to make whatever provisions are necessary to protect the public. The Contractor shall use foresight and shall take such steps and precautions as its operations warrant to protect the public from danger, loss of life or loss of property, which would result from interruption or contamination of public water supply, interruption of other public services, or from the failure of partly completed work or partially removed facilities. Unusual conditions may arise on the work, which will require that immediate and unusual provisions be made to protect the public from danger or loss, or damage to life and property, due directly or indirectly to prosecution of work under this contract.
Whenever, in the opinion of the Engineer, an emergency exists against which the Contractor has not taken sufficient precaution for the public safety, protection of utilities and protection of adjacent structures or property, which may be damaged by the Contractor’s operations and when, in the opinion of the Engineer, immediate action shall be considered necessary in order to protect the public or property due to the Contractor’s operations under this contract, the Engineer will order the Contractor to provide a remedy for the unsafe condition. If the Contractor fails to act on the situation within a reasonable time period, the Engineer may provide suitable protection to said interests by causing such work to be done and material to be furnished as, in the opinion of the Engineer may seem reasonable and necessary.
The cost and expense of said labor and material, together with the cost and expense of such repairs as are deemed necessary, shall be borne by the Contractor. All expenses incurred by the City for emergency repairs will be deducted from the progress payments and the final payment due to the Contractor. However, if the City does not take such remedial measures, the Contractor is not relieved of the full responsibility for public safety.
The following subsection(s) are hereby added to Section 5-7 of the Standard Specifications:
GP-15
5-7.9 Traffic and Access.
The Contractor shall notify the occupants of all affected properties in writing at least forty-eight (48) hours (2 working days) prior to any temporary obstruction of access. Contractor to revise all dates daily on no-parking signs. If works does not begin on the date posted on the no-parking sign, Contractor then shall replace all signs with the new correct dates. Vehicular access to the property line shall be maintained except as required for construction for a reasonable period of time. No overnight closure of any driveway will be allowed except as permitted by the Engineer.
At least one twelve-foot-wide traffic lane shall be provided for each direction of travel on all streets at all times except as permitted by the Engineer. The Contractor must submit a traffic control plan to the City and obtain approval of same in writing from the City Engineer. The Contractor shall maintain at least one lane of traffic in each direction at all times during construction. The plan shall be prepared per latest edition of California Manual on Traffic Control Devices (CA-MUTCD).
There are some driveways that require replacement in order to be handicap compliant. Where a property has two driveways, only one driveway at a time can be closed for replacement. Where a single driveway to a property has a considerable width, half of the driveway is to be closed, worked on and reopened for usage before the other half of the driveway can be worked on.
All driveways have to be open for access during project non-construction hours and days which may require use of plating and other devices or methods.
No driveway can be worked on until the owner/tenant has been informed in writing with five (5) working days’ notice of the scheduled work and has agreed to the planned schedule of the Contractor.
Under situations of driveway closure to pedestrians, the Contractor shall post advance notice on barricades to direct pedestrian to use the sidewalk on the opposite side of the street or the Contractor may elect to provide continuous K-rail in the curb lane to allow pedestrians to walk in the curb lane behind the K-rail. Any and all devices such as plates, barricades, K-rails and notices shall be continuously maintained for pedestrian and vehicle safety. No curb lanes shall be closed during non-working days of the week. Appropriate advance warning signs shall be continuously maintained as needed during the project. All such devices, warning signs and interruptions of normal vehicle lanes, parking lanes and pedestrian walkways shall be shown on the Traffic Control Plan for advance approval by the City.
Clearances from traffic lanes shall be five feet to the edge of any excavation and two feet to the face of any curb, pole, barricade, delineator, or other vertical obstruction.
Any striped roadway shall be delineated by the Contractor with temporary raised reflective markers when it is to be left un-striped overnight.
5-7.9.1 Street Closures, Detours, Barricades.
This subsection is hereby added to section 5-7.9 of the Standard Specifications:
Street closures will not be allowed except as specifically permitted by the Engineer.
GP-16
At the Pre-Construction meeting, the Contractor shall submit to the Engineer a detailed written plan for traffic control and construction sequencing for the project. The plan shall include drawings as necessary to clearly outline how traffic flow and pedestrian walkways will be handled during the course of construction and where detour and advance notice signs will be posted.
Traffic lane transitions shall not be sharper than a taper of thirty to one.
Temporary traffic channelization shall be accomplished with barricades, K-rail sections or delineators. Temporary striping will not be allowed unless specifically permitted by the Engineer.
The Contractor shall prepare any plans that may be required for temporary striping to the satisfaction of the Engineer. In no event will temporary striping be allowed to remain on finish pavement surfaces.
In no case shall traffic be diverted from the existing traveled way without prior approval of the City Engineer.
The contractor shall include in his Traffic Control Plan use of lighted message boards to notify traffic of project and any changes in vehicle or pedestrian travel routes.
If the Contractor shall fail to provide and install any of the signs or traffic control devices ordered by the Engineer, the Engineer may either stop the work or cause such signs or traffic control devices to be placed by others and charge the cost therefor against the Contractor, and deduct same from the next progress payment
5-7.9.2 Protection of the Public.
This subsection is hereby added to section 5-7.9 of the Standard Specifications:
It is part of the service required of the Contractor to make whatever provisions are necessary to protect the public. The Contractor shall use foresight and shall take such steps and precautions as its operations warrant to protect the public from danger, loss of life or loss of property, which would result from interruption or contamination of public water supply, interruption of other public services, or from the failure of partly completed work or partially removed facilities. Unusual conditions may arise on the work, which will require that immediate and unusual provisions be made to protect the public from danger or loss, or damage to life and property, due directly or indirectly to prosecution of work under this contract.
Whenever, in the opinion of the Engineer, an emergency exists against which the Contractor has not taken sufficient precaution for the public safety, protection of utilities and protection of adjacent structures or property, which may be damaged by the Contractor’s operations and when, in the opinion of the Engineer, immediate action shall be considered necessary in order to protect the public or property due to the Contractor’s operations under this contract, the Engineer will order the Contractor to provide a remedy for the unsafe condition. If the Contractor fails to act on the situation within a reasonable time period, the Engineer may provide suitable protection to said interests by causing such work to be done and material to be furnished as, in the opinion of the Engineer may seem reasonable and necessary.
GP-17
The cost and expense of said labor and material, together with the cost and expense of such repairs as are deemed necessary, shall be borne by the Contractor. All expenses incurred by the City for emergency repairs will be deducted from the progress payments and the final payment due to the Contractor. However, if the City does not take such remedial measures, the Contractor is not relieved of the full responsibility for public safety.
SECTION 6 – PROSECUTION AND PROGRESS OF THE WORK
6-1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF WORK.
The following is hereby added to this subsection of the Standard Specifications:
The Contractor’s proposed Construction Schedule shall be submitted to the Engineer within ten working days after the date of the City’s execution of the Contract Agreement. The schedule shall be supported by written statements from each supplier of materials or equipment indicating that all orders have been placed and acknowledged and setting forth the dates that each item will be delivered.
Prior to issuing the Notice to Proceed, the Engineer will schedule a preconstruction meeting with the Contractor to review the proposed Construction Schedule and delivery dates, arrange utility coordination a non-pay item, discuss construction methods, and clarify inspection procedures.
The Contractor shall submit periodic Progress Reports to the Engineer by the last day of each month. The Report shall include an updated Construction Schedule. Any deviations from the original schedule shall be explained. Progress payments will be withheld pending receipt of any outstanding reports.
6-3 TIME OF COMPLETION.
6-3.1 General.
This subsection of the Standard Specifications is hereby replaced by the following:
All construction work is to be completed within one hundred and ten (110) working days. 6-3.2 Contract Time Accounting.
The following is hereby added to this subsection of the Standard Specifications:
The Contractor’s activities shall be confined to the hours between 7:00 a.m. and 3:30 p.m., Monday through Friday, excluding holidays, for daytime work and to the hours between 8:00 p.m. starting Monday and 5:00 a.m. ending Saturday, excluding holidays, for nighttime work. Deviation from these hours will not be permitted without the prior consent of the Engineer, except in emergencies involving immediate hazard to persons or property. In the event of either a requested or emergency deviation, inspection service fees will be charged against the Contractor. The service fees will be calculated at overtime rates including benefits, overhead, and travel time. The service fees will be deducted from any amounts due the Contractor. Should the Contractor choose nighttime work, any and all lighting and traffic control, as needed, shall be provided by the Contractor. 6-9 LIQUIDATED DAMAGES
GP-18
The liquidated damages value mentioned in this section is hereby amended to be $7,500.00 per day.
SECTION 7 – MEASUREMENT AND PAYMENT
7-3 PAYMENT
7-3.2 Partial and Final Payment.
This subsection of the Standard Specifications is hereby replaced by the following:
The closure date for the purpose of making partial progress payments will be on or about the twenty-fifth (25th) day of each month. The Contractor shall prepare the approximate measurement of the work performed through the closure date and submit it to the City for approval along with an updated construction schedule.
When the work is complete, the Engineer will determine the final quantities of the work performed and prepare the final progress payment.
Payments are commonly authorized and made within forty-five days following the last day of the month submitted. However, payments will be withheld pending receipt of any outstanding reports required by the contract documents. In addition, the final progress payment will not be released until the Contractor returns the control set of Plans and Specifications showing the as-built conditions and any other required documents.
A full five percent (5%) retention will be deducted from all progress payments. The final retention will be authorized for final payment forty-five (45) days after the date of recordation of the Notice of Completion.
The Contractor, however, may receive interest on the retention for the length of construction, or receive the retention itself as long as the retention is substituted with escrow holder surety of equal value.
At the request and expense of the Contractor, surety equivalent to the retention may be deposited with the State Treasurer or a State or Federally chartered bank as the escrow agent, who shall pay such surety to the Contractor upon satisfactory completion of the contract.
Sureties eligible for investment shall include those listed in Section 16430 of the State Government Code or bank or savings and loan certificates of deposit.
Any escrow agreement entered into shall contain the following provisions:
a) The amount of surety to be deposited;
b) The terms and conditions of conversion to cash in case of default of the Contractor; and c) The termination of the escrow upon completion of the contract.
Decisions to Withhold Progress Payments
GP-19
The Engineer may withhold or nullify the requested Progress Payments in whole or in part due to the Contractor to such extent as may be necessary to protect the City from loss as a result of because of any of the circumstances listed below:
1. Defective work not remedied in accordance with provisions of the Contract Documents;
2. Third party claims, liens or stop notices filed or reasonable evidence indicating probable filing of such claims, liens or stop notices;
3. Failure of the Contractor to make payments properly for labor, services, materials, equipment, or other facilities or to subcontractor;
4. A reasonable doubt that the work can be completed for the unpaid balance of the Contract Sum;
5. A reasonable doubt that the Contractor will complete the work within the agreed Contract Time;
6. Costs to the Owner resulting from failure of the Contractor to complete the work within the stipulated time, or in accordance with the terms of the contract;
7. Damage to other work or property;
8. Failure to fulfill all the requirements of the Contract Documents;
9. When there is pending litigation against the City related to this contract or reasonable anticipation thereof;
10. Failure of the contractor to maintain all records as required; to submit progress schedules, weekly payroll records, minority enterprise utilization reports and forms and any other such item required by these specifications;
11. Failure to pay laborers and mechanics employed by the contractor or any subcontractor on the work the full amount of wages required by this contract, after written notice to the contractor.
12. Failure of Contractor of the subcontractors to comply with applicable laws;
13. Any reason specified elsewhere in the Contract Documents as grounds for a withholding, offset or setoff or that would legally entitle City to a setoff or recoupment;
14. Additional professional, consultant or inspection services required due to Contractor’s failure to comply with Contract Documents;
15. Liquidated damages payable to City;
16. Materials ordered or paid by City on behalf of Contractor;
GP-20
17. Damage loss caused to City, a separate contractor, homeowner contractor or any other person or entity due to the actions of the Contractor;
18. Cleanup performed by City and chargeable to Contractor;
19. Failure of Contractor to pay contributions due and owing to employee benefits funds pursuant to applicable collective bargaining agreements or trust agreements;
20. Failure of Contractor or any Subcontractor to properly pay prevailing wages as defined in California Labor Code Section 1720 et/ seq.;
21. A breach by Contractor of any obligation or provision of the Contract Documents.
22. Whenever the City shall, in accordance herewith, withhold any monies otherwise due the Contractor, written notice of the amount withheld and the reasons therefore shall be given the Contractor, and, when the Contractor shall remove the grounds for such withholding, the City will pay to the Contractor, within 35 calendar days, the amount so withheld.
Application of Withholding
Sums properly withheld in good faith may be used by City without a prior judicial determination of City’s actual rights with respect to recovery of any Loss on which such withholding is based.
Contractor agrees and hereby designates City as its agent in for such purposes, and agrees that such payments shall be considered as payments made under the Construction Contract by City to Contractor. City shall submit to Contractor accounting of such funds disbursed on behalf of Contractor. As an alternative to such payment, City may, in its sole discretion, elect to exercise its rights to adjust the Contract Sum.
Payment by City
After an Application for Progress Payment has been made, the City shall make payment in a timely manner unless there is a good faith reason for withholding the payments in accordance with the provisions of the Contract Documents or Applicable Law.
Payment to Subcontractors
Upon receipt of payment from City, Contractor shall pay the Subcontractors performing the Work, out of the amount paid to Contractor on account of such Subcontractor’s portion of the work, the amount of which said Subcontractor is entitled in accordance with the terms of its contract with Contractor and Applicable Laws, including, without limitation, California Public Contract Code Section 7107. Contractor shall remain responsible, notwithstanding a withholding by City pursuant to the terms of these General Conditions, to promptly satisfy from its own funds sums due to all Subcontractors who have performed the Work that is included in Contractor’s Application for Payment. Contractor shall, by appropriate agreement, require each Subcontractor to make payments to its sub-contractors and suppliers in similar manner. City shall have no obligation to pay or be responsible in any way for payments to Subcontractors, of any Tier.
Direct Negotiation of Stop Notices
GP-21
City shall have the right to directly discuss, negotiate, settle or pay, without notice to or participation by Contractor, any stop notice claims asserted by the Subcontractors, of any Tier, and to deduct such sums paid from sums due to Contractor.
Release of Stop Notices
Except to the extent of any payments that City fails to make to Contractor under circumstances that constitute a breach by City of its payment obligations under the Contract Documents, if any stop notice, whether invalid or valid, is made, filed with, served upon or asserted against City or a Homeowner by any of the Subcontractors, of any Tier, or their agent or employee, for money claimed due for Work of any kind provided, then Contractor shall within five (5) Days after written notice by City and at Contractor’s Own Expense, procure, furnish and record appropriate releases or other instruments which under Applicable Laws will full release, extinguish and removed such stop notice. Unless and until such stop notice is fully released as afore-stated, City shall have the right to retain from any payments then due, or thereafter to become due, an amount equal to one hundred and fifty percent (150%) of the amount necessary to satisfy, discharge and defend against any such stop notice and any action or proceeding thereon which may be brought to judgment or award. If the amount to be paid, or the amount retained thereon, is insufficient to satisfy, discharge or defend against such stop notice and any action of proceeding thereon, then Contractor shall be liable for the difference and upon written demand shall immediately deposit the same with City.
The provisions in this paragraph are in addition to such other rights as City may have against Contractor under the Contract Documents or Applicable Laws.
Failure of Payment by City
If, through no fault of Contractor or failure by Contractor to comply with its obligations under the Contract Documents, Payment is not issued within thirty (30) Days after receipt of an undisputed and properly prepared and submitted Application for Payment then Contractor may, upon fourteen (14) additional Days’ written notice to City, stop the Project Work for which such Application for Payment is received until payment is received as to any undisputed and owing work. Any resulting Delay associated with the shut down and start-up of the Project Work as a result of Contractor’s proper exercise of its rights under this paragraph shall constitute a Compensable Delay.
Disputed Payments, Continuous Work
No dispute or disagreement with respect to the amount of any payment claimed due by Contractor shall relieve or excuse Contractor from the obligation to proceed with and maintain continuous, expeditious and uninterrupted performance of the Work.
Completion. Inspection. Punch List. Re-Inspection
A Contractor-generated punch list must be provided to the City or its representative prior to the request for final inspection. It will be the discretion of the City or its representative to grant the final inspection based on the Contractor generated punch list. Contractor shall achieve Completion of the Project Work in accordance with the requirements of the Contract Time and other provisions of the Contract Documents. Contractor shall notify Engineer when Contractor believes that the Project Work for is Complete.
GP-22
Unless the Engineer determines that the Project Work is not sufficiently complete to warrant an inspection to determine Compliance, the Engineer, accompanied by the Inspector of Record and any others deemed appropriate by the Engineer, will inspect the Project Work performed.
Contractor, along with such Subcontractors and others as Engineer deems necessary shall participate in the inspection. If the Project Work is found to be Complete, then Engineer shall proceed to issue a written completion notice as provided hereinafter.
Any items necessary for Compliance that are found missing, incomplete or requiring correction shall be summarized by Contractor in a Completion Punch List and promptly signed by Contractor and delivered to Engineer. Contractor shall proceed within forty-eight (48) hours after signing the Completion Punch List to commence correction and completion of the items listed.
Contractor shall notify Engineer when the items listed are completed at which time a re-inspection shall be scheduled in the same manner as the original inspection. If said inspection discloses any item, whether or not included on the original Punch List, which is found missing, incomplete, or requiring correction said item shall be corrected before a Notice of Completion shall be issued.
The City shall be reimbursed or at its option shall withhold from Contractor’s payments, amounts incurred by City to conduct more than two (2) inspections to determine Compliance of the Project Work. A Notice of Completion shall be issued by the Engineer when he determines that Compliance of the Project Work has occurred.
Final Completion
Contractor shall expeditiously and diligently perform all items of Project Work on the Final Completion Punch List so as to achieve Final Completion of the Project Work within the requirements of the Contract Time for Final Completion of the Project Work. Contractor shall forward to Engineer a written notice when Contractor believes that it has completed all of the items on the Final Completion Punch List and is read for a Final Completion Inspection. Unless Engineer determines that the Project Work is not sufficiently complete to warrant an inspection to determine Final Completion, Engineer, accompanied by Inspector of Record and any others deemed appropriate by Engineer, will inspect Project Work performed. If the Project Work is found to be Finally Complete, then Engineer shall proceed to issue a Notice of Final Completion as provided hereinafter.
If said inspection discloses any item, whether or not included on the Final Completion Punch List, which is found missing, incomplete, or requiring correction said item shall be corrected before a Notice of Final Completion shall be issued. The City shall be reimbursed or at its option shall withhold from Contractor’s payments, amounts incurred by City to conduct more than two (2) inspections to determine Final Compliance of the Project Work for any Home. A Notice of Final Completion shall be issued by the Engineer when he determines that Final Compliance of the Project Work has occurred.
Concluding Payment
Upon issuance by Engineer of the Notice of Final Completion for the Project Work Contractor shall submit to Engineer its Application for Payment requesting payment for completion. Without limitations to any other conditions to payment set forth elsewhere in the Contract Documents, the
GP-23
following shall be conditions precedent to a proper submission, and to Engineer’s approval, of Contractor’s Application for Final Payment:
1. Submission of an affidavit that payrolls, bills for materials and equipment, and other indebtedness connected with the Project Work for which City or City’s or Homeowner’s property or funds might be liable have been paid or otherwise satisfied;
2. Submission of consent of Surety, if any, to Completion Payment;
3. Submission of a certificate evidencing that the insurance required by the Contract Documents is in force;
4. Submission of conditional releases and waivers of stop notice and bond rights upon final payment in the form required by California Code Section 3262(d)(3) executed by Contractor and by all Subcontractors, of every Tier, performing any portion of the Project Work;
5. Submission of all Close-Out Documents for the Project Work;
6. Submission of adequate and complete certified payroll records as required by the Contract Documents for any time period that Project Work was performed, which have not been submitted by Contractor in connection with its previous Applications for Payments.
7. Proper payment of prevailing wages as defined in California Labor Code Section 1720, et seq for the Project Work.
8. Submission of certificates by Contractor and each Subcontractor, as required by any applicable collective bargaining agreement or trust agreement or Applicable Laws, certifying that all employees’ benefits relating to the Project Work due and owing having been paid in full; and
9. Submission of any other documents or information required by the Contract Documents as a condition of Final Payment or Final Completion of the Project Work.
Final Payment Terminates Liability
No claim shall be made or be filed, and neither the City nor any of its officers or agents shall be liable or held to pay any money, except as specifically provided in the Contract Documents.
The acceptance by the Contractor of the final payment aforesaid shall operate as, and shall be, a release to the City and its agents, from all claim and liability to the Contractor for anything done or furnished for, or relating to, the work or for any act or neglect of the City or of any person relating to or affecting the work, except the claim against the City for the remainder, if any there be, of the amounts kept or retained as provided elsewhere in these General Conditions.
Securities in Lieu of Retention
Provisions of California Public Contract Code Section 22300 et. seq. substitution of eligible and equivalent securities for retention held by City to ensure Contractors performance under the Contract will be permitted at the request and expense of the Contractor and in conformity with
GP-24
California Section 22300. The foregoing notwithstanding, the Contractor shall have ten (10) days following action by the City to award the Agreement to the Contractor to submit its written request to the City to permit the substitution of securities for retention under California Public Contract Code Section 22300. The failure of such Contractor to make such a written request for the City within said ten (10) day period shall be deemed a waiver of the Contractor’s right under California Public Contract Code Section 22300.
In the event the Contractor wishes to choose to exercise its rights under California Public Contract Code Section 22300, the Contractor shall enter into an escrow agreement with the City, and the escrow agent, a state or federally chartered bank in California with a current A.M. Best Rating of not less than “A,” in the form specified by said Section 22300. Contractor shall have the obligation of ensuring that such securities deposited are sufficient to maintain it total fair market value an amount equal to the cash amount of the sums to be withheld under the Agreement. If upon written notice from the City or from the appropriate escrow agent, indicating that the fair market value of the securities has dropped below the dollar amount of monies to be withheld by the City to ensure performance, Contractor shall, within five (5) days of the date of such notice, post additional securities as necessary to ensure that the total fair market value of all such securities held by the City, or in escrow, is equivalent to the amount of money to be withheld by the City under the Agreement.
Any escrow agreement entered into shall contain the following provisions:
(a) The amount of surety to be deposited;
(b) The terms and conditions of conversion to cash in case of default of the Contractor; and
(c) The termination of the escrow upon completion of the contract.
7.3.3 Delivered Materials
This subsection of the Standard Specifications is hereby replaced by the following:
Materials and equipment delivered but not incorporated into the work will not be included in the estimate for partial progress payment.
7-3.5 Contract Unit Prices
7-3.5.1 General
This subsection of the Standard Specifications is hereby replaced by the following:
If the Engineer orders a change in quantity of an item of Work, and the change does not involve a substantial change in character of the Work from that shown in the Plans or Specifications, the City will adjust the total payment to be made for the item of Work by multiplying the amount authorized and installed by the Contract Unit Price. This amount may be greater or less than the amount shown in the Bid.
GP-25
If the total quantity of a Major Bid Item is changed, only changes within 25% of the quantity shown in the Bid, either more or less, will be adjusted at the Contract Unit Price. 7-3.5.2 Increases of More than 25 Percent
This subsection of the Standard Specifications is hereby replaced by the following:
No adjustments for any unit bid price for any quantity that will vary by more than 25% will be allowed.
7-3.5.3 Decreases of More than 25 Percent
This subsection of the Standard Specifications is hereby replaced by the following:
No adjustments for any unit bid price for any quantity that will vary by more than 25% will be allowed.
7.4 PAYMENT FOR EXTRA WORK
7-4.3 Markup
7-4.3.1 Work by the Contractor
The following is hereby added to this subsection of the Standard Specifications:
The following percentages shall be added to the Contractor's costs and shall constitute the markup for all overhead and profit:
Labor 20%
Materials 15%
Equipment Rentals 15%
Other Contractor's costs 15%
One percent (1%) may also be added to the sum of costs and markups as compensation for the Contractor's bond premium.
7-4.3.2 Work by the Subcontractor
The following is hereby added to this subsection of the Standard Specifications:
When a subcontractor performs all or any part of the extra work, the markups in paragraph (a) shall be added to the subcontractor's actual cost of such work. The Contractor may add an additional markup of 10% of the first $5,000 of the subcontracted portion of the extra work and 5% on work added in excess of $5,000 of the subcontracted portion of work.
SECTION 8 – FACILITIES FOR AGENCY (CITY) PERSONNEL
Replace this section of the Standard Specifications with the following:
GP-26
No field offices for City personnel will be required, however, the City personnel shall have the right to enter upon the project at all times and shall be admitted to the offices of the Contractor for the project in the City if so, provided by the Contractor for his own personnel.
SECTION 9 – CITY STANDARDS, STANDARD PLANS AND DRAWINGS Section 9 is hereby added to the Standard Specifications as follows:
All public improvements, construction and dedications required and described in this manual shall conform to the standards and specifications of the City. Standards, Standard Plans and Drawings of the following agencies are used by the City of Montebello and are part of the City’s standards.
Where there is ambiguity or conflict between standards over which standard shall apply, the City Engineer shall determine what shall apply, and his determination shall be final. All construction is subject to the approval of the City Engineer.
Standard Plans – Standard Plans for Public Works Construction, SPPWC, “Latest Edition and Supplement”.
Los Angeles County Public Works Department – Grey Book and all plans except those modified or replaced by City Standards.
Sanitation Districts of Los Angeles County - Applicable sewer and manholes.
State of California – California Department of Transportation (Caltrans) Standard Specifications and Standard Plans - Pavement markings and traffic loops.
City Standards - All applicable standard plans.
Standard Specifications - The 2021 edition of, and applicable amendments to, the “Standard Specifications for Public Works Construction (SSPWC).”
California Manual on Traffic Control Devices (CA-MUTCD), “Latest Edition”.
SECTION 10 – CLAIMS AND PROTESTS
Section 10 is hereby added to the Standard Specifications as follows:
Excerpts from the Public Contract Code 9204:
(a) The Legislature finds and declares that it is in the best interests of the state and its citizens to ensure that all construction business performed on a public works project in the state that is complete and not in dispute is paid in full and in a timely manner. (b) Notwithstanding any other law, including, but not limited to, Article 7.1 (commencing with Section 10240) of Chapter 1 of Part 2, Chapter 10 (commencing with Section 19100) of Part 2, and Article 1.5 (commencing with Section 20104) of Chapter 1 of Part 3, this section shall apply to any claim by a contractor in connection with a public works project. (c) For purposes of this section:
GP-27
(1) “Claim” means a separate demand by a contractor sent by registered mail or certified mail with return receipt requested, for one or more of the following:
(A) A time extension, including, without limitation, for relief from damages or penalties for delay assessed by a public entity under a contract for a public works project. (B) Payment by the public entity of money or damages arising from work done by, or on behalf of, the contractor pursuant to the contract for a public works project and payment for which is not otherwise expressly provided or to which the claimant is not otherwise entitled. (C) Payment of an amount that is disputed by the public entity. (2) “Claim” means a “Contractor” means any type of contractor within the meaning of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code who has entered into a direct contract with a public entity for a public works project. (3)(A) “Public entity” means, without limitation, except as provided in subparagraph (B), a state agency, department, office, division, bureau, board, or commission, the California State University, the University of California, a city, including a charter city, county, including a charter county, city and county, including a charter city and county, district, special district, public authority, political subdivision, public corporation, or nonprofit transit corporation wholly owned by a public agency and formed to carry out the purposes of the public agency. (B) “Public entity” shall not include the following:
(i) The Department of Water Resources as to any project under the jurisdiction of that department. (ii) The Department of Transportation as to any project under the jurisdiction of that department. (iii) The Department of Parks and Recreation as to any project under the jurisdiction of that department.
(iv) The Department of Corrections and Rehabilitation with respect to any project under its jurisdiction pursuant to Chapter 11 (commencing with Section 7000) of Title 7 of Part 3 of the Penal Code.
(v) The Military Department as to any project under the jurisdiction of that department. (vi) The Department of General Services as to all other projects. (vii) The High-Speed Rail Authority.
(4) “Public works project” means the erection, construction, alteration, repair, or improvement of any public structure, building, road, or other public improvement of any kind. (5) “Subcontractor” means any type of contractor within the meaning of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code who either is in direct contract with a contractor or is a lower tier subcontractor. (d)(1)(A) Upon receipt of a claim pursuant to this section, the public entity to which the claim applies shall conduct a reasonable review of the claim and, within a period not to exceed 45 days, shall provide the claimant a written statement identifying what portion of the claim is disputed and what portion is undisputed. Upon receipt of a claim, a public entity and a contractor may, by mutual agreement, extend the time period provided in this subdivision. (B) The claimant shall furnish reasonable documentation to support the claim. (C) If the public entity needs approval from its governing body to provide the claimant a written statement identifying the disputed portion and the undisputed portion of the claim, and the
GP-28
governing body does not meet within the 45 days or within the mutually agreed to extension of time following receipt of a claim sent by registered mail or certified mail, return receipt requested, the public entity shall have up to three days following the next duly publicly noticed meeting of the governing body after the 45-day period, or extension, expires to provide the claimant a written statement identifying the disputed portion and the undisputed portion. (D) Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. If the public entity fails to issue a written statement, paragraph (3) shall apply.
(2)(A) If the claimant disputes the public entity’s written response, or if the public entity fails to respond to a claim issued pursuant to this section within the time prescribed, the claimant may demand in writing an informal conference to meet and confer for settlement of the issues in dispute.
Upon receipt of a demand in writing sent by registered mail or certified mail, return receipt requested, the public entity shall schedule a meet and confer conference within 30 days for settlement of the dispute.
(B) Within 10 business days following the conclusion of the meet and confer conference, if the claim or any portion of the claim remains in dispute, the public entity shall provide the claimant a written statement identifying the portion of the claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. Any disputed portion of the claim, as identified by the contractor in writing, shall be submitted to nonbinding mediation, with the public entity and the claimant sharing the associated costs equally. The public entity and claimant shall mutually agree to a mediator within 10 business days after the disputed portion of the claim has been identified in writing. If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the claim. Each party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator. If mediation is unsuccessful, the parts of the claim remaining in dispute shall be subject to applicable procedures outside this section.
(C) For purposes of this section, mediation includes any nonbinding process, including, but not limited to, neutral evaluation or a dispute review board, in which an independent third party or board assists the parties in dispute resolution through negotiation or by issuance of an evaluation.
Any mediation utilized shall conform to the timeframes in this section. (D) Unless otherwise agreed to by the public entity and the contractor in writing, the mediation conducted pursuant to this section shall excuse any further obligation under Section 20104.4 to mediate after litigation has been commenced.
(E) This section does not preclude a public entity from requiring arbitration of disputes under private arbitration or the Public Works Contract Arbitration Program, if mediation under this section does not resolve the parties’ dispute.
(3) Failure by the public entity to respond to a claim from a contractor within the time periods described in this subdivision or to otherwise meet the time requirements of this section shall result in the claim being deemed rejected in its entirety. A claim that is denied by reason of the public entity’s failure to have responded to a claim, or its failure to otherwise meet the time requirements of this section, shall not constitute an adverse finding with regard to the merits of the claim or the responsibility or qualifications of the claimant.
(4) Amounts not paid in a timely manner as required by this section shall bear interest at 7 percent per annum.
GP-29
(5) If a subcontractor or a lower tier subcontractor lacks legal standing to assert a claim against a public entity because privity of contract does not exist, the contractor may present to the public entity a claim on behalf of a subcontractor or lower tier subcontractor. A subcontractor may request in writing, either on his or her own behalf or on behalf of a lower tier subcontractor, that the contractor present a claim for work which was performed by the subcontractor or by a lower tier subcontractor on behalf of the subcontractor. The subcontractor requesting that the claim be presented to the public entity shall furnish reasonable documentation to support the claim. Within 45 days of receipt of this written request, the contractor shall notify the subcontractor in writing as to whether the contractor presented the claim to the public entity and, if the original contractor did not present the claim, provide the subcontractor with a statement of the reasons for not having done so.
(e) The text of this section or a summary of it shall be set forth in the plans or specifications for any public works project that may give rise to a claim under this section. (f) A waiver of the rights granted by this section is void and contrary to public policy, provided, however, that (1) upon receipt of a claim, the parties may mutually agree to waive, in writing, mediation and proceed directly to the commencement of a civil action or binding arbitration, as applicable; and (2) a public entity may prescribe reasonable change order, claim, and dispute resolution procedures and requirements in addition to the provisions of this section, so long as the contractual provisions do not conflict with or otherwise impair the timeframes and procedures set forth in this section.
SP-1
SPECIAL PROVISION
PART 2 – BID ITEM DESCRIPTIONS
FOR
MONTEBELLO DOWNTOWN SEWER INFRASTRUCTURE PROJECT
(WHITTIER BLVD FROM MONTEBELLO BLVD TO 1ST ST &
PALM PL FROM SPRUCE ST TO PALM DR)
C.I.P. No. 919
IN THE CITY OF MONTEBELLO
All Bid Items shall be in accordance with the Standard Specifications for Public Works Construction (SSPWC), including supplements, State of California Department of Transportation (Caltrans) Standard Specifications, Latest Edition, and the Special Provisions and General Conditions of these specifications.
Mobilization/Demobilization - Mobilization and Demobilization is not a separate bid item, but will be incorporated in all bid unit prices in the bid schedule Mobilization shall conform to the provisions of Sections 9-3.4 of the Standard Specifications.
Mobilization and demobilization shall consist of preparatory work and operations including, but not limited to, those necessary for the movement of personnel, equipment, materials, and incidentals to and from the project site necessary for work on the project and for all other work and operations which must be performed or costs incurred including bonds, insurance, and financing prior to beginning work on the various contract items on the project site. Mobilization shall also include the time, materials, and labor to move the necessary construction equipment to and from the site, supervisory time on the job by the Contractor’s personnel to keep the construction site in a safe condition, and all other related work as required at all times and for all non-working days during the construction period. The Contractor is responsible for securing an adequate storage site for equipment and materials. Demobilization includes removal of all equipment and materials from the site, clean up and restoration of the work site at the end of project. Mobilization shall also include pressure washing of all USA markings, clearing and grubbing operations preceding and post construction consisting of removing all natural and artificial objectionable materials from the Right-of-Way in construction areas, road approaches and material sites. Clearing and grubbing shall conform to the provision of section 300-1 of the standard specifications.
No additional amounts shall be paid for erosion control, Best Management Practices (BMP), erosion damage clean-up, and removal of debris from the project site, NPDES requirements, or removal of soil and other materials deposited on public streets by construction traffic.
Best Management Practices (BMP) shall be defined as any program, technology, process, citing criteria, operating method, measure, or device, which controls, prevents, removes, or reduces
SP-2
pollution. The Contractor shall obtain and refer to the California Storm Water Best Management Practice Handbooks, Volume 3, Construction BMP Handbook and the Los Angeles County Department of Public Works Best Management Practices Handbook for Construction Activities.
Los Angeles County Department of Public Works
Cashier’s Office
900 South Fremont Avenue
Alhambra, CA 91803
Telephone: 626-458-6959
The Contractor shall have a minimum of two readily accessible copies of each publication on the Contract site at all times plus any copies of applicable environmental mitigation plans.
Additional BMPs may be required as a result of a change in actual field conditions, contractor activities, or construction operation. When more than one BMP is listed under each specific BMP category, the Contractor shall select the appropriate and necessary number of BMPs within each category in order to achieve the BMP objective.
BMPs for Contractor activities shall be continuously implemented throughout the year and project time period. BMPs for erosion control and sedimentation shall be implemented during the period from October 15 to April 15, and whenever the National Weather Service Predicts rain within 24 hours. BMPs for erosion control and sedimentation shall also be implemented prior to the commencement of any Contractor activity or construction operation, which may produce run-off, and whenever run-off from other sources may occur.
The Agency (City), as a permittee thereto, is subject to enforcement actions by the State Water Resources Control Board, Environmental Protection Agency, and private citizens. The City will pass through to the Contractor any penalty assessed by these entities for each calendar day that the Contractor has not fully implemented the BMPs specified for the Contract and/or is otherwise in noncompliance with these provisions. In addition, the City will deduct, from the final payment due the Contractor, the total amount of any fines levied on the City, plus legal and staff costs, as a result of the Contractor’s lack of compliance with these provisions and/or less than complete implementation of the specified BMPs.
Mobilization and Demobilization is not a separate bid item, but will be incorporated in all bid unit prices in the bid schedule, and shall be considered full compensation for obtaining all business licenses and permits, as required for the entire project, from all related agencies, including, but not limited to, utility companies, private and public agencies and the City of Montebello; and complying with the requirements specified in those licenses and permits; coordination, field office facility, implementation of Best Management Practices, and incidentals necessary to perform all related items of work. No additional compensation will be allowed therefor.
SP-3
Bid Item No. 1 – Project Information Signs
The Contractor shall supply, erect, and maintain public improvement project signs for the duration of construction according to the specifications set forth below. A scaled layout of the sign shall be submitted to the City of Montebello for approval prior to fabrication. The sign is illustrated in Appendix “C”.
Size: 4 feet by 6 feet with a 7 feet clearance above ground level.
Materials: 3/4-inch (exterior type) plywood (C-C EXT-DFPA grade).
Support: 4-inch by 4-inch by 10 feet posts.
Mounting: Frame shall be constructed using 2 inches by 6 inches by 8 feet skids centered on each post and a 2 inch by 4 inches by 5 feet 6 inches 45-degree brace for each skid and a 2 inches by 6 inches cross-strut between the bottom of the posts all of bolted construction. Plywood panel shall be mounted using 3/8 inch by 5 inches carriage bolts at 16 inches maximum on center.
Paint: Panel Face: Three coats outdoor enamel (sprayed) Panel Rear and Frame: Two coats outdoor enamel (sprayed).
Color: Stark white background and blue lettering.
Lettering: Silkscreen enamels, Helvetica medium.
Covering: 1/4 inch clear plastic.
Location: The signs shall be placed at each end of the street that work is being constructed on.
If work occurs within the alleys, signs shall be placed at the adjacent crossing streets near the alley approaches or any other location where alleys are accessible to oncoming vehicle traffic. If various locations of work are included, the signs will be moved by the Contractor per the City’s schedule.
Duration: The signs shall be placed a minimum of one week prior to start of work.
Disposition: After the Notice of Completion is issued, the sign shall become the property of the City, and the Contractor shall deliver the sign to the Public Works Facility at no expense to the City.
Payment for Project Information Signs shall be based on Each (EA) Unit Price basis and shall include full compensation for all labor materials, tools, equipment, and for doing all work involved, including delivery of the sign to the Public Works Facility at the end of the project.
SP-4
Bid Item 2 - Traffic Control
Traffic Control, Traffic Control plan, construction signing and traffic maintenance shall comply with the provisions of Section 600 of the Standard Specification and the current requirements set forth in the “Manual of Traffic Controls for Construction and Maintenance Work Zones” published by the Department of Transportation, State of California, and Manual on Uniform Traffic Control Devices (CA-MUTCD), Latest Edition, by the Federal Highway Administration and California, the traffic control plans and these Special Provisions.
The Contractor shall maintain the following clearances from the edge of traffic lanes:
1) 5 feet to any excavation,
2) 2 feet to curbs or temporary concrete barriers,
3) 10 feet to poles and other obstructions on uncurbed roadways.
If determined by the Engineer that it is necessary to decrease these minimum distances to allow for the prosecution of the work, the Contractor shall provide all protective devices required by the Engineer to adequately protect the public.
PUBLIC CONVENIENCE
Within ten (10) working days after the date of the City’s execution of the Contract Agreement the Contractor shall submit a proposed Construction Schedule for approval. Based on the approved project schedule, the Contractor shall notify residents and businesses of the proposed work and post temporary “NO PARKING” signs at no cost to the City. Signs shall be posted at all intersections, and on each side of the street a maximum of 200 feet between signs. Signs may not be attached to existing poles, street lights standards or trees. All signs must be posted on delineators or stakes provided by the Contractor. The “NO PARKING” signs shall be in place not less than seventy two (72) hours prior to performing the work; therefore a request for changes in the schedule requiring additional posting shall be submitted by the Contractor for approval by the Engineer at least seventy-two (72) hours prior to reconstruction and paving the street. All conflicting parking signage shall be covered.
Due to the nature of this project involving major inconvenience to residents and businesses, a good Public Relations Program is mandatory and evidence of satisfactory past performance in this area will be required.
The Contractor is to distribute two (2) City-approved “Public Notice” to each residence and business affected by the project. The first notice shall be distributed ten (10) calendar days prior to the start of any work. The second notice shall be distributed at least seventy two (72) hours prior to the start of work on a specific section of the street. A sample copy of the notice must be approved by the City. Said notice shall be attached to a red information hanger provided by the Contractor and hung on the gate or front door knob. The Contractor shall also coordinate with the bus services to ensure the safe operation of buses and access to bus stops in the construction area.
Notices shall be in English and Spanish languages.
SP-5
The Contractor shall also coordinate with the street sweeping, trash disposal, Montebello Bus Lines and postal services agencies to ensure the safe operation of their vehicle and access in the construction area.
All complaints received by the City associated with the construction project alleging damage to private property and vehicles shall be responded to by the Contractor within twenty-four (24) hours (one working day) of notification. Failure to comply with this provision may result in a penalty of One Hundred dollars ($100.00) per occurrence.
All trucks, which the Contractor proposes to use, that exceed the legal load limit when loaded will be required to have overweight permits issued by the City.
The Contractor shall be responsible for adequate barricading of the work area and controlling of traffic in the vicinity of the project as specified in the Standard Specifications.
PROTECTION OF WORK AND PUBLIC
The Contractor shall take all necessary measures to protect work and prevent accidents during any and all phases of the work. The Contractor shall repair all damaged pavement as a result of vandalism (i.e., vehicle tracks, footprints, graffiti, etc.) If deemed necessary by the City, the Contractor shall repair the defective area in accordance with these special provisions.
CONSTRUCTION SIGNING
Construction signing shall consist of furnishing, installing, maintaining and removing construction signs and barricades as required by the “California Manual on Uniform Traffic Control Devices”, CA-MUTCD. The traffic control system shall be installed on a road prior to starting work for that road and shall not be removed until all work has been completed on that road. Existing speed limit signs, which conflict with the work zone speed limit, shall be covered during the entire construction period.
TRAFFIC MAINTENANCE
The Contractor shall be responsible for handling vehicular and pedestrian traffic in accordance with Section 600 of the Standard Specifications and these Special Provisions.
The Contractor shall prepare all necessary traffic control plans and submit to the City for approval at the pre-construction meeting. The traffic control plans shall be prepared by a California Licensed Traffic Engineer and shall show:
1. Notification Signs.
2. Existing and temporary lane lines.
3. Dimensions of the work zone and street improvements.
4. Advance warning signs.
5. Delineators
6. Lighting, for nighttime work.
SP-6
The plans shall be submitted to the City at the preconstruction meeting prior to commencing work and shall incorporate a complete and separate plan for each stage of construction proposed by the Contractor. This plan shall indicate the sequence of lanes or portions of lanes being closed for each phase. The traffic control plans shall indicate the travel plan for each phase of construction.
The traffic control plans shall state:
1. That the plan will conform to “California Manual on Uniform Traffic Control Devices”, CA-MUTCD.
2. Emergency contact person and phone number.
3. Minimum lane widths and minimum clearance to obstructions.
The traffic control plan shall be approved by the City of Montebello prior to beginning any removals.
The Contractor shall cooperate with the City of Montebello relative to handling traffic through all work areas and shall make his own arrangements relative to keeping the working area clear of parked vehicles and maintaining clear access to driveways.
The Contractor shall furnish and install construction notification signs as shown on traffic control plans and as specified by the City of Montebello.
The Contractor shall provide for controlled pedestrian crossings through the work. Crossings shall provide pedestrians a means of passing over or through the work without tracking tack coat or hot asphalt concrete or P.C.C. work or endangering pedestrian safety. All temporary pedestrian crossings shall be in compliance with the latest Americans with Disabilities Act design standards and supplements.
At intersections, if a cross road needs to be temporarily closed when work is in progress through the intersection and the anticipated traffic delay is more than five (5) minutes, a detour sign shall be installed on the cross street and shall include the installation of advance signing displaying the anticipated delay time. The signing of the detour route shall be approved by the Engineer prior to installation of the detour and closure of the road.
The Contractor shall provide for one lane of travel in each direction at all times unless approved by the Engineer. When two-way traffic is restricted to one lane in each direction, and when applying paving past intersecting roads, traffic shall be controlled as required by the “California Manual on Uniform Traffic Control Devices”, CA-MUTCD. A pilot car and driver will be required at various locations if control by flaggers and/or control devices proves deficient in the opinion of the Engineer. In no case shall the Contractor provide less than one (1) lane of travel in each direction through the construction zone including cross-streets.
Contractor’s equipment and personal vehicles of the Contractor’s employees shall not be parked on the traveled way at any time. Overnight parking of construction equipment shall be confined to an approved storage site selected by the Contractor and approved by the City.
SP-7
TEMPORARY GUIDE MARKERS
Temporary guide markers shall be portable Caltrans Standard Specifications approved delineators.
Only one type of temporary guide marker shall be used on any road at any one time.
Temporary guide markers shall be placed adjacent to the edge of all vertical lips or excavations that exceed 3/4 inches. If the temporary guide markers are damaged, or are not in an up-right position, from any cause, said markers should immediately be replaced or restored to their original locations, in an upright position by the Contractor.
PORTABLE DELINEATORS
The vertical portion of the portable delineators shall be brilliant orange or predominantly orange in color. The posts shall be not less than 100 square inches, measured through the vertical axis of the delineator, normal to the roadway. The minimum height shall be thirty-seven (37) inches above the traveled way.
Two 4-inch nominal width reflective bands shall be mounted a minimum of 1 ½ inches apart and at a height on the post so that one reflective band will be between 2.5 feet and 3 feet above the roadway surface.
Reflective bands shall be flexible vinyl plastic, either white or yellow, and shall have not less than the following dry reflective values at a 0.2 degree divergence angle, expressed I units if candlepower per foot-candle per square foot. The wet reflective values shall not be less than ninety percent (90%) of the dry values.
Dry Reflective Value
Angle of Incidence 4º 5º 30º
White 250 165 50
Yellow 10 110 50
All tests for reflective values shall be performed in accordance with California Test Method No. 642.
The portable delineators shall be spaced as necessary for proper delineation; however, in no case shall the spacing between portable delineators exceed thirty (30) feet on tangents or twenty (20) feet on curves.
FLUORESCENT TRAFFIC CONES
Provide lighted flashers and lighting for night time. Traffic cones shall be fluorescent new or reconditioned and of good commercial quality, flexible material suitable for the purpose intended.
The outer section of the portion above the base of the once shall be highly pigmented fluorescent orange polyvinyl compound. The overall height of the cone shall be anchored in a manner such
SP-8
that the traffic cone will remain in an upright position. Lighted flashers and lighting shall be provided additionally for nighttime.
The fluorescent traffic cones shall be spaced as necessary for proper delineation; however, in no case shall the spacing between fluorescent cones exceed thirty (30) feet on tangents or twenty (20) feet on curves.
STRIPING
Temporary striping and marking for traffic control shall conform to Section 310-5.6.5 of the Standard Specifications. Temporary striping and marking which has no further use shall be removed by wet sandblasting, and all sand used in sandblasting shall be removed without delay as the sandblasting operation progresses.
RESTRICTIONS ON CLOSURE OF STREETS AND TRAFFIC LANES
The Contractor shall conduct all operations so as to provide access to the adjoining properties and have no greater length or quantity of work under construction that can be properly prosecuted with a minimum of inconvenience to the public.
The Contractor shall construct temporary A.C. ramps or equal to provide safe and drivable access to residents and business properties daily.
The Contractor shall coordinate all shipments and deliveries to businesses. If steel plates are required, they shall be provided by the Contractor at no additional cost to the City.
The Contractor shall be responsible for furnishing, placing and maintaining barricades and lights as necessary to protect the public from danger due to the work being done.
No additional amounts shall be paid for erosion control, erosion damage clean-up, and removal of debris from the project site, NPDES requirements, or removal of soil deposited on public streets by construction traffic.
Payment for Traffic Control and Stage Construction shall be included in the Lump Sum (LS) Price bid and shall be considered full compensation for providing and maintaining safe traffic control including all temporary signs, striping and delineation, flaggers, preparing and providing traffic control plan during the project, obtaining all approvals and permits, as required, from all related agencies, including, but not limited to, public agencies and the City of Montebello; and complying with the requirements specified in those licenses and permits, coordination, field office facility; and incidentals necessary to perform all related items of work.
Bid Item No. 3 – Provide Construction Survey
It shall be the responsibility of the Contractor to supply any and all construction surveying and staking required. All surveying shall be performed under the direct supervision of a California Licensed Land Surveyor or a Civil Engineer duly licensed to perform land surveying.
SP-9
It is the Contractor’s responsibility to Re-establish Survey Monuments and Centerline ties as disturbed in the field and shall conform to Standard Specification for Public Works Construction Section 309 and as modified below. All work done on monuments shall be recorded and copies thereof filed with the City of Montebello Engineer and the County Surveyor. This work will include all re-establishment of all monuments that are disturbed through the course of completing this project, including property tags due to any concrete removal and replacement at sidewalk or curb and gutter.
A corner record survey shall be completed and filed with the County of Los Angeles Surveyor for each survey monument that the Contractor resets. A copy of each corner record shall be provided to the City of Montebello after filing with the County.
Construction Staking consists of furnishing transportation, labor, materials, and equipment to provide surveying and field engineering under the direction of a land surveyor or professional engineer licensed in the State of California. Furnish skilled labor, instrument platforms, ladders and such other temporary structures, required lighting for making and maintaining points and lines in connection with the surveys required.
Construction Staking shall conform to the Standard Specification Section 2-9. Work under this Section includes, but is not limited to, the following:
1. Establish and maintain horizontal and vertical control points from City of Montebellosupplied benchmarks and baselines.
2. Establish temporary benchmarks.
3. Layout of all work.
4. Construction staking for earthwork and paving work required on the project.
5. Control, staking, and grade checking for all earthworks.
6. Control for construction of reinforcing steel, concrete work, and structural steel work.
7. Maintain records on reproducible contract drawings (ASCII points file) of as-constructed locations of project components and features during the course of the project.
The City of Montebello reserves the right to check the accuracy of Contractor's survey measurements and calculations. Regardless of whether or not the City of Montebello exercises this right, the requirements for Contractor accuracy and adequacy will not be waived.
Copies of all completion survey notes, and other data shall be furnished to the City of Montebello prior to beginning work that requires their use.
Prior to completion of Project and when requested by the City of Montebello, Contractor shall submit a copy of project drawing and certificate signed by California Registered Land Surveyor or Professional Engineer as applicable, that elevations and locations of Work are in conformance with Contract Documents.
SP-10
Contractor shall set permanent monuments and file “Record of Survey Map”. The contractor shall be responsible to maintain a complete and accurate log of control and survey work as it progresses.
Contractor shall field verify locations of survey control points prior to starting any work on the Project Site. Contractor shall establish and submit to the City of Montebello any temporary control points as necessary due to construction activity. The Contractor shall notify the City of Montebello of any discrepancies discovered and resolve prior to starting any work.
The Contractor shall lay out work from the City of Montebello's established control points, baselines, ranges and gauges and shall be responsible for all measurements in connection therewith. Furnish, at Contractor's expense, all stakes, templates, platforms, equipment, range markers, and labor as may be required in laying out any part of the Work from the points and lines established by the City of Montebello. The Contractor will be held responsible for the execution of the Work to such lines and grades as may be established or indicated by the City of Montebello.
It shall be the responsibility of the Contractor to maintain and preserve all stakes and other marks established by the Surveyor/Engineer retained by the Contractor until authorized to remove them.
If such marks are destroyed by the Contractor or through negligence prior to their authorized removal, they may be replaced by the City of Montebello. The expense of replacement will be deducted from any amounts due, or to become due, the Contractor.
Surveying shall conform to methods, procedures, and requirements of the Caltrans Survey Manual.
Contractor shall set finish grades at a maximum of 25-ft. intervals for dirt, 25-ft. intervals for rock and at all grade breaks. Contractor shall establish or reestablish baselines and field control points as necessary and provide all basic site engineering to assure accurate locations and elevations for construction. It will be Contractor’s responsibility to verify location and elevation of existing structures and utilities as required for new work.
Control datum for survey may be indicated on Contract Drawings. Contractor shall locate and protect, or replace survey control and reference points, preserve permanent reference points during construction and provide record of survey for replacement at record monument. The Contractor shall report to the City of Montebello loss or destruction of any reference point or relocation required because of changes in grades or other reasons and replace dislocated survey control points based on original survey control. There will be no changes without prior written notice to the City of Montebello.
Payment for Provide Construction Survey shall be paid for at the contract unit price per Lump Sum (LS) and shall be considered full compensation for furnishing labor, materials, equipment and removal after construction, and no additional compensation will be allowed therefor.
Contractor shall submit electronic files of surveys conducted for Progress Payments with each Pay Request.
Bid Item No. 4 – Remove Existing Asphalt Concrete (AC) Pavement This section shall conform to Subsection 300-2, 300-4, and 401 of the Standard Specifications and these Special Provisions. Remove existing AC pavement shall consist of all excavation including
SP-11
sawcutting and removal of roadways bituminous pavement, regardless of thickness, to the limits shown on the plans.
Payment for removal of full depth AC Pavement along the width of the sewer infrastructure trench limits shall be included in this bid item of work and no additional compensation will be allowed.
Payment for this bid item will not cover the 1-foot-wide cold mill per the detail noted on the Improvement Plans and shall be covered under Bid Item No. 12 Cold Mill Exist Asphalt Concrete (AC) Pavement (2").
Payment for Remove Existing AC Pavement shall be paid at the contract unit price bid per Square Foot (SF) and shall include full compensation for doing all work, including furnishing all materials, labor, equipment, tools, removal and disposal of base and subbase, and incidentals as required and no additional compensation will be allowed therefore.
The price includes protection of existing utilities located within the excavation limits.
Bid Item No. 5 –Remove Existing Concrete Pavement
This Bid Item shall conform to Subsection 300-2, 300-4, and 401 of the Standard Specifications and these Special Provisions. Remove existing concrete pavement shall consist of all excavation including sawcutting and removal of concrete pavement, regardless of thickness, as shown on the plans.
Payment for removal full depth concrete pavement along the width of the sewer infrastructure trench limits shall be included in this bid item of work and no additional compensation will be allowed. Payment for this bid item shall not be included in Bid Item No. 26 & 27 Construct Polyvinyl Chloride (PVC) Sewer Pipe.
Payment for Remove Existing Concrete Pavement shall be paid at the contract unit price bid per Square Foot (SF) and shall include full compensation for doing all work, including furnishing all materials, labor, equipment, tools, removal and disposal of base and subbase, and incidentals as required and no additional compensation will be allowed therefore.
The price includes protection of existing utilities located within the excavation limits.
Bid Item No. 6 – Remove Existing Sewer Main
This Bid Item shall also include all labor, material and equipment required to remove existing sewer main for the project as shown on the plans, as directed by the Engineer, and Standard Specifications and these Special Provisions.
Removal work shall conform to the provisions of Section 300-2, 306-1, 401 and 402 of the Standard Specifications for Public Works Construction, Standard Plans for Public Works Construction and the Sewer Improvement Plans made part of these Specifications. The work shall include protecting all existing utilities unless otherwise noted, removing sewer pipe of all sizes and materials, removing pipe bedding, and capping existing connections.
SP-12
Prior to removal of the existing sewer mainline, the Contractor shall be responsible for jetting and cleaning the existing sewer main to facilitate a complete and unobstructed closed-circuit television (CCTV) inspection. The Contractor shall identify and record the location, size, and condition of all existing sewer laterals connected to the existing mainline. CCTV logs and video shall be submitted to the Engineer for review 10 working days prior to commencing sewer construction. The Contractor shall notify the Engineer of any defects, blockages, or unusual conditions discovered during cleaning or inspection.
The Contractor shall ensure that there is no stoppage of sewer service at the end of each working day. If an existing sewer main is removed or abandoned, the Contractor shall be fully responsible for maintaining uninterrupted flow and service to all upstream users. Temporary bypass pumping or diversion systems shall be implemented as necessary to ensure continuous operation. No shutdown of sewer service will be permitted without prior written authorization from the Engineer.
Payment for Remove Existing Sewer Main construction shall be made at the unit price bid per Linear Foot (LF) and shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in trench excavation and shoring as needed, backfill and compaction, trench safety, removal of existing fittings or appurtenances, and CCTV inspection, as shown on the plans, as specified in these specifications, and as directed by the Engineer.
No additional payment will be made for excavation, disposal, and/or restoration beyond what is specified for the project as shown on the plans, as directed by the Engineer, and Standard Specifications and these Special Provisions.
Payment for Remove Existing Sewer Main shall be included in this bid item of work and no additional compensation will be allowed. This bid item shall be separate from Bid Item No. 26 & 27 Construct Polyvinyl Chloride (PVC) Sewer Pipe.
Bid Item No. 7 – Remove Existing Sewer Manhole
This Bid Item shall also include all labor, material and equipment required to remove existing sewer manhole for the project as shown on the plans, as directed by the Engineer, and Standard Specifications and these Special Provisions.
Removal work shall conform to the provisions of Sections 300-2, 306-4, 401, and 402 of the Standard Specifications for Public Works Construction, the Standard Plans for Public Works Construction, and the Sewer Improvement Plans made part of these Specifications. The work shall include protecting all existing utilities unless otherwise noted, removal and disposal of sewer manholes of all materials including components such as base slabs, grade rings, cones, frame and cover, and steps, temporary flow control or bypass pumping where required to maintain sanitary sewer service during construction, backfilling, compaction, and restoration of the manhole area to match the existing or proposed grade.
SP-13
Payment for Remove Existing Sewer Manhole construction shall be made at the unit price bid per Each (EA) and shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in trench excavation and shoring as needed, backfill and compaction, trench safety, removal and disposal of existing fittings or appurtenances, and CCTV inspection, as shown on the plans, as specified in these specifications, and as directed by the Engineer.
No additional payment will be made for excavation, disposal, and/or surface restoration beyond what is specified for the project as shown on the plans, as directed by the Engineer, and Standard Specifications and these Special Provisions. Asphalt pavement or concrete pavement restoration shall be paid under separate bid items, refer to Bid Item No. 14 & 16 Construct Asphalt Concrete (AC) Base Course and Construct Concrete Pavement respectively.
Bid Item No. 8 – Abandon Existing Sewer Main
This Bid Item shall also include all labor, material and equipment required to abandon in place existing sewer main for the project as shown on the plans, as directed by the Engineer, and Standard Specifications and these Special Provisions.
Abandonment work shall conform to the provisions of Section 306-3.3, 401 and 402 of the Standard Specifications for Public Works Construction, Standard Plans for Public Works Construction and the Sewer Improvement Plans made part of these Specifications. The abandon pipes shall be filled with sand cement slurry 1-sack (941 lbs) of concrete. In lieu of slurry, the contractor may use low density cellular concrete, Elastizell (EF) or approved equal.
Prior to abandonment of the existing sewer mainline, the Contractor shall be responsible for jetting and cleaning the existing sewer main to facilitate a complete and unobstructed closedcircuit television (CCTV) inspection. The Contractor shall identify and record the location, size, and condition of all existing sewer laterals connected to the existing mainline. CCTV logs and video shall be submitted to the Engineer for review 10 working days prior to commencing sewer construction. The Contractor shall notify the Engineer of any defects, blockages, or unusual conditions discovered during cleaning or inspection.
The Contractor shall ensure that there is no stoppage of sewer service at the end of each working day. If an existing sewer main is abandoned, the Contractor shall be fully responsible for maintaining uninterrupted flow and service to all upstream users. Temporary bypass pumping or diversion systems shall be implemented as necessary to ensure continuous operation. No shutdown of sewer service will be permitted without prior written authorization from the Engineer.
The Contractor shall demonstrate that the pipe to be abandoned has been completely filled, without voids, by providing volume calculations for each placement of grout and materials strength tests as required by the City. The Contractor is responsible for the selection methods and material to be used. Pipe abandonment shall be coordinated with the construction sequence.
Appropriate plugs shall be installed by the Contractor, and grout shall be injected in an upslope manner to remove trapped air. Samples of the outgoing water (at the exit end) shall be made until
SP-14
the existing grout mix is observed to be similar to the grout being injected at the inlet end. The grouting plan, and grout mix design shall be submitted to the Engineer for review and approval prior to commencement of work
Payment for Abandon Existing Sewer Main construction shall be made at the unit price bid per Linear Foot (LF) and shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in excavating, installing and backfilling, complete in place, including pipe, fittings, wye and band coupling, trench excavation and backfill, trench safety, and CCTV inspection, as shown on the plans, as specified in these specifications, and as directed by the Engineer.
No additional payment will be made for surface restoration under this bid item. Pavement or concrete restoration shall be paid under separate bid items, refer to Bid Item No. 14 & 16 Construct Asphalt Concrete (AC) Base Course and Construct Concrete Pavement respectively.
Bid Item No. 9 –Remove Existing Longitudinal Gutter
This Bid Item shall include all labor, material and equipment required to sawcut, remove, haul away and properly dispose of existing concrete longitudinal gutter and related adjacent areas needed to construct an alley gutter. Removal of concrete longitudinal gutter as shown on the Contract Drawings and as directed in the field by the Engineer shall conform to Subsection 401 of the Standard Specifications for Public Works Construction.
Sawcutting shall be accomplished by the use of a power driven saw. The depth of the cut shall be deep enough to provide a clean, straight break without loosening, cracking, or damaging adjoining asphalt or concrete. A clean sawcut edge shall be maintained until new concrete longitudinal gutter is constructed. Generally sawcuts shall be on existing joints or score mark.
All necessary sawcutting of existing concrete longitudinal gutter shall be to the lines as shown on plans and as directed in the field by the Engineer. Sawcutting shall be included in the unit price and no further compensation shall be made.
Payment for Remove Existing Longitudinal Gutter shall be paid for at the contract unit price per Linear Foot (LF) and shall be considered full compensation for complying with the above requirements and shall include furnishing of labor, materials, equipment, sawcutting, removal, excavation, hauling, properly disposing, protection of facilities, grading, sub-grade compaction, restoration and incidentals for doing all the work involved complete in place and no additional compensation will be allowed.
Removal of a 2-foot-wide, full-depth strip of AC pavement along edge of gutter for forming in alleys with full AC removal or cold mill and overlay shall be included in Bid Item No. 14 Construct Asphalt Concrete (AC) Base Course and no additional compensation will be allowed.
SP-15
Bid Item No. 10 –Remove Existing Driveway Approach
This Bid Item shall include all labor, material and equipment required to sawcut, remove, haul away and properly dispose of: existing concrete driveway, curb and/or gutter, existing concrete curb ramp, ramping transition with concrete curb, and adjacent sidewalk and subgrade compaction as shown on the plans and as required for forming, paving, planting area base, sub base, native and all existing improvements to provide clear area for construction of new driveway, curb ramp, adjacent sidewalk, and curb and/or gutter; also shall include transitions to comply with ADA requirements. Removal of concrete driveway and adjacent improvements as shown on the Contract Drawings and as directed in the field by the Engineer shall conform to Subsection 300-1.3.2 (b and c), 300-2, and 401 of the Standard Specifications for Public Works Construction. Concrete shall be Class 520-C-2500 as specified in Section 201-1.1.2 of the Standard Specifications for Public Works Construction.
Sawcutting shall be accomplished by the use of a power driven saw. The depth of the cut shall be deep enough to provide a clean, straight break without loosening, cracking, or damaging adjoining asphalt or concrete. A clean sawcut edge shall be maintained until new concrete driveway, sidewalk, curb and gutter, and curb ramp is constructed. Generally sawcuts shall be on existing joints or score mark.
All necessary sawcutting of existing concrete driveway or any adjacent existing improvements shall be to the lines as shown on plans and as directed in the field by the Engineer. Sawcutting shall be included in the unit price and no further compensation shall be made.
This item shall include root clearing and/or tree root removal of the sections immediately adjacent and underneath driveway, sidewalk, and curb and gutter in order to bring to final finish grade. Full compensation for root clearing and tree root removal shall be included in the unit price of Remove Exist Driveway Approach and no further compensation shall be made.
Payment to Remove Existing Driveway shall be paid for at the contract unit price per Square Foot (SF) and shall include full compensation for furnishing all labor, materials, tools, equipment, backfilling, grading, compacting, forming, pouring, finishing, sawcutting, removal, excavation, hauling, properly disposing, protection of facilities, restoration and incidentals for doing all the work involved complete in place and no additional compensation will be allowed.
Removal of a 2-foot-wide, full-depth strip of AC pavement along edge of gutter for forming shall be included in Bid Item No. 14 Construct Asphalt Concrete (AC) Base Course and no additional compensation will be allowed.
Bid Item No. 11 –Remove Existing Cross Gutter
This Bid Item shall include all labor, material and equipment required to sawcut, remove, haul away and properly dispose of existing concrete cross gutter and/or spandrel and related adjacent areas needed to construct a cross gutter and/or spandrel. Removal of concrete cross gutter as shown on the Contract Drawings and as directed in the field by the Engineer shall conform to Subsection 401 of the Standard Specifications for Public Works Construction.
SP-16
Sawcutting shall be accomplished by the use of a power driven saw. The depth of the cut shall be deep enough to provide a clean, straight break without loosening, cracking, or damaging adjoining asphalt or concrete. A clean sawcut edge shall be maintained until new concrete Cross Gutter and/or Spandrel is constructed. Generally sawcuts shall be on existing joints or score mark.
All necessary sawcutting of existing concrete Cross Gutter and/or Spandrel shall be to the lines as shown on plans and as directed in the field by the Engineer. Sawcutting shall be included in the unit price and no further compensation shall be made.
Payment for Remove Existing Cross Gutter shall be paid for at the contract unit price per Square Foot (SF) and shall be considered full compensation for complying with the above requirements and shall include furnishing of labor, materials, equipment, sawcutting, removal, excavation, hauling, properly disposing, protection of facilities, grading, sub-grade compaction, restoration and incidentals for doing all the work involved complete in place and no additional compensation will be allowed.
Removal of a 2-foot-wide, full-depth strip of AC pavement along edge of gutter for forming shall be included in Bid Item No. 14 Construct Asphalt Concrete (AC) Base Course and no additional compensation will be allowed.
Bid Item No. 12 – Cold Mill Exist Asphalt Concrete (AC) Pavement (2”) Cold milling shall conform to the provisions of Section 302-1 and 404 of the Standard Specifications for Public Works Construction. The Contractor shall cold mill existing asphalt concrete (AC) pavement to the depth required for the placement of new pavement as shown on the plans and as directed in the field by the Engineer. All work shall be completed in accordance with lines and grades, and typical cross-sections shown on the drawings. Any extra cold milling beyond the shown limits shall be at the Contractor’s expense.
All existing asphalt concrete (AC) pavement to join new construction shall be sawcut in a straight line. Contractor shall exercise due caution to avoid any damage to existing improvements, protecting in-place of existing water mains, sewers, storm drains, meters, valve covers, wall, fences, curbs, fire hydrants, telephone and power poles, and other existing structures.
It is the Contractor’s responsibility to perform whatever additional exploration is necessary to avoid causing any damage to the existing utilities under the work area. Any damage done by the Contractor shall be repaired or replace as called out in Section 7-9 of the Standard Specifications for Public Works Construction at the Contractor’s expense.
This work shall consist of cutting existing asphalt concrete (AC) pavement to facilitate its removal.
Any sawcutting shall be accomplished by the use of a power-driven saw to provide a clean, straight break without loosening, cracking, or damaging adjoining asphalt or concrete. A clean sawcut edge shall be maintained until surface course AC is constructed. Under this item, the use of a grinder will not be allowed in lieu of power-driven saw.
SP-17
During the cold milling operation, the Contractor shall remove all loosened materials from milled areas, haul away and dispose of them at a legal site as specified in Sub-section 300-1.3 of Standard Specifications for Public Works Construction and submit evidence of the proper disposal to the City of Montebello. The Contractor shall abate dust nuisance by cleaning, sweeping, and sprinkling with recycled water (if available) or other means as necessary.
Any petromat found during grinding shall be removed by scraping and by burning it with a torch.
The Contractor shall be responsible for assuming the cost of removing, hauling, recycling and any other incidental of any petromat found during grinding operation and no adjustment on the Bid price shall be made.
Also, The Contractor shall remove all asphalt residuals along existing gutter.
Crack Sealing (Not a Bid item)
After the completion of the cold milling operation, ¼” wide cracks and larger shall be cleaned by hot air blowing to provide intact bonding surfaces which are free of moisture and debris. After the cracks have been properly cleaned, they shall be sprayed with an approved soil sterilant, and then filled with SS-1H asphaltic emulsion and sanded. Cracks and pop-outs larger than 1” wide shall be sealed with a D2-SC-800 stockpile mix.
Payment for Cold Mill of Exist AC Pavement (2”) shall be paid for at the price bid per Square Foot (SF) and shall be considered full compensation for furnishing labor, materials, equipment, sawcutting, removals, hauling and disposal of asphalt concrete materials excavated or grinded, grade for the base, crack sealing, compaction and no additional compensation will be allowed therefore.
Bid Item No. 13 – Construct 2” Conventional AC Surface Course (Type C2-PG 64-10) This Bid Item shall include all labor, material and equipment required to furnish and construct a 2-inch thick Conventional Asphalt Concrete (AC) Overlay using Type C2-PG 64-10 asphalt and binder, as shown on the plans, specified herein, and in accordance with the Standard Specifications for Public Works Construction and these Special Provisions.
All work shall conform to Sections 302 and 400-4 of the Standard Specifications for Public Works Construction, the Improvement Plans that are part of these Specifications, and these Special Provisions. The work shall include but is not limited to: cleaning and preparing the pavement surface, applying tack coat, furnishing, placing, and compacting asphalt.
Tack coat shall be Grade SS-1H, per Section 302-5.4 and shall be applied to the perimeter of all AC overlay locations and cold milling locations. (All tack coat overspray on gutter lip shall be removed.)
Payment for Construct 2” Conventional AC Surface Course (Type C2-PG 64-10) shall be paid for at the price bid per Ton (TN) and shall be considered full compensation for furnishing labor,
SP-18
materials, equipment, cleaning and preparing the pavement surface, tack coat, protection of existing facilities, conform grinding as required, furnishing, placing, and compacting asphalt.
No additional compensation shall be made for work necessary to complete the overlay construction as shown on the plans, as specified herein, or as directed by the Engineer.
The City will not compensate the Contractor for any additional costs incurred by change or lack of availability of asphalt binders or variation of oil pipes.
Temporary asphalt concrete work where required by the Engineer for traffic control or other purposes shall be considered included in the price bid for Traffic Control and no additional compensation will be allowed.
Bid Item No. 14 – Construct Asphalt Concrete (AC) Base Course All work shall conform to Sections 203 & 302 of the “Standard Specifications for Public Works Construction” and these Special Provisions.
Asphalt concrete shall be Type B-PG 64-10 for 3” and 5” base course. Tack coat shall be Grade SS-1H, per Section 302-5.4 and shall be applied to the perimeter of all AC removal and replacement locations and cold milling locations. (All tack coat overspray on gutter lip shall be removed.)
The Contractor shall use a PG Asphalt Binder.
PG Asphalt binder shall conform to the following requirements:
1. Description
Asphalt shall consist of refined petroleum or a mixture of refined liquid asphalt and refined solid asphalt, prepared from crude petroleum. Asphalt shall be:
A. Free from residues caused by the artificial distillation of coal, coal tar, or paraffin.
B. Free from water.
C. Homogeneous.
2. Materials
A.General
The Contractor shall furnish asphalt in conformance with the State of California Department of Transportation (Caltrans) “Certification Program for Suppliers of Asphalt.” Caltrans maintains the program requirements, procedures, and a list of approved suppliers can be obtained from (Caltrans).
SP-19
The Contractor shall ensure the safe transportation, storage, use, and disposal of asphalt.
The Contractor shall prevent the formation of carbonized particles caused by overheating asphalt during manufacturing or construction.
B. Grades
Performance graded (PG) asphalt binder shall be PG 64-10 and conform to the following:
Performance Graded Asphalt Binder
RTFO Test Aged Binder
Dynamic Shear,
Test Temp. at 10 rad/s, ºC
Mínimum G*/sin(delta),
kPa
T315
58 2.20
64 2.20
64 2.20
64 2.20
70 2.20
Ductility at 25ºC
Minimum, cm
T51
75 75 75 75 75
PAV f Aging,
Temperature, ºC
R28
100 100 100 100 100
RTFO Test and PAV Aged Binder
Dynamic Shear,
Test Temp. at 10 rad/s, ºC
Mínimum G*sin(delta), kPa
T315
22 d
5000
31 d
5000
28 d
5000
22 d
5000
34 d
5000
Creep Stiffness, T313
Test Temperature, ºC -12 0 -6 -18 0
Maximum S-value, MPa 300 300 300 300 300
Minimum M-value 0.300 0.300 0.300 0.300 0.300
Notes:
a. Recommended as asphalt rubber base stock for high mountain and high desert area.
Property
AASHTO
Test
Method
Specification
Grade
PG
58-22 a
PG
64-10
PG
64-16
PG
64-28
PG
70-10
Original Binder
Flash Point, Minimum ºC T48 230 230 230 230 230
Solubility, Minimum % b T44 99 99 99 99 99
Viscosity at 135ºC, c
Maximum, Pa’s
T316
3.0 3.0 3.0 3.0 3.0
Dynamic Shear,
Test Temp. at 10 rad/s, ºC
Mínimum G*/sin(delta),
kPa
T315
58 1.00
64 1.00
64 1.00
64 1.00
70 1.00
RTFO Test e,
Mass Loss, Maximum, %
T240
1.00 1.00 1.00 1.00 1.00
SP-20
b. The Engineer may waive this specification if the supplier is a Quality Supplier as defined by the Caltrans’ “Certification Program for Suppliers of Asphalt.” c. The Engineer may waive this specification if the supplier certifies the asphalt binder can be adequately pumped and mixed at temperatures meeting applicable safety standards.
d. The sample will be tested at 3ºC higher if it fails at the specified test temperature.
G*sin(delta) shall remain 5000 kPa maximum.
e. “RTFO Test” means the asphaltic residue obtained using the Rolling Thin Film Oven Test, AASHTO Test Method T240 or ASTM Designation: D 2827. f. “PAV” means Pressurized Aging Vessel.
C. Sampling
The Contractor’s asphalt supplier shall provide a sampling device in the asphalt feed line connecting the plant storage tanks to the asphalt weighing system or spray bar.
The sampling device shall be accessible between 600 and 750 mm (30 inches) above the platform. The supplier shall provide a receptacle for flushing the sampling device.
The sampling device shall include a valve:
1) With a diameter between 10 and 20 mm.
2) Manufactured in a manner that a one-liter sample may be taken slowly at any time during plant operations.
3) Maintained in good condition.
The Contractor’s supplier shall replace failed valves.
In the presence of the City Engineer, the Contractor’s supplier shall take 2 oneliter samples per operating day. Round friction top containers with one-liter capacity for storing samples shall be provided.
D. Applying Asphalt
Unless otherwise specified, the Contractor shall heat and apply asphalt in conformance with the provisions in Caltrans Standard Specifications Section 93, “Liquid Asphalts.” The Contractor shall apply paving asphalt at a temperature between 120ºC and 190ºC.
The City Engineer will determine the exact temperature of paving asphalt.
Subgrade preparation shall conform to Section 301-1 of the Standard Specifications for sections containing no aggregate base. After removal of the existing pavement section to the depths required to place the new AC section, re-compaction of the existing subgrade, if non-AC or nonPC, will be required to 95 percent in conformance with the requirements set forth in Section 301-
1.3 of the Standard Specifications for Public Works Construction.
At all locations where new asphalt concrete pavement is joining existing asphalt pavement, the Contractor shall sawcut or cold mill/grind existing pavement to provide straight neat lines and
SP-21
place the new asphalt concrete to form a smooth transition. Payment for saw-cutting/grinding and removing the existing pavement shall be included in a separate Bid Item.
The Contractor shall be responsible for maintaining location of, and access to, all water line gate valves during construction operations.
Initial or breakdown compaction shall consist of a minimum of three roller passes coverage of a layer of asphalt mixture. A pass shall be a movement of a roller in both directions over the same path. Coverage shall be as many passes as are necessary to cover the entire width being paved.
Overlap between passes during any coverage made to insure compaction without displacement of material in accordance with good rolling practice shall be considered a part of the coverage being made and not a part of a subsequent coverage. Each coverage shall be completed before subsequent coverage is started. Pneumatic rollers shall not be used without prior approval of the City Engineer.
The top AC layer of each lane, once commenced, shall be placed without interruption.
Measurement
The quantities of the asphalt concrete to be paid for will be measured by the actual tonnage (ton) of material and no additional compensation will be allowed therefor. The Contractor shall furnish to the Engineer at the time of delivery of the material on the job site a legible copy of a Licensed Weighmaster’s Certificate showing gross, tare, and net weights of each truckload of asphalt concrete mixture.
Payment for Construct Asphalt Concrete (AC) Base Course shall be per the unit price bid per Ton (TN), and shall include full compensation for furnishing all labor, materials, tools, equipment, all surface preparation, including crack cleaning and sealing, soil sterilant, tack coating, spreading, grading, compacting, hauling, proper disposing, and incidentals for doing all the work involved complete in place.
The City will not compensate the Contractor for any additional costs incurred by change or lack of availability of asphalt binders or variation of oil pipes.
Temporary asphalt concrete work where required by the Engineer for traffic control or other purposes shall be considered included in the price bid for Traffic Control and no additional compensation will be allowed.
Bid Item No. 15 – Crushed Aggregate Base (CAB)
Crushed Aggregate Base shall conform to the requirements of the STANDARD SPECIFICATIONS Section 200-2.
The finished surface of the aggregate base shall be smooth and level and allow for a uniform depth of asphalt concrete or concrete pavement.
Payment for Crushed Aggregate Base (CAB) shall be made at the contract unit price paid per Cubic Yard (CY), as shown on the Bid Schedule, and shall include full compensation for furnishing all labor, materials, tack coat where required, tools, equipment, and incidentals to
SP-22
accomplish the work as specified herein, including but not limited to subgrade preparation, and no additional compensation will be allowed therefore.
Bid Item No. 16 – Construct Concrete Pavement
This Bid Item shall include all labor, equipment, and materials required to Construct Concrete Pavement at the locations and to the dimensions shown on the Plans or as directed by the Engineer.
All work shall conform to the applicable provisions of Sections 302-6 and 306 of the Standard Specifications.
Concrete Pavement shall be Class 520-A-2500 conforming to the requirements of the Standard Specifications Section 201-1. The finished surface of concrete pavement shall be smooth and level.
Payment for Construct Concrete Pavement shall be made at the contract unit price paid per Cubic Yard (CY), as shown on the Bid Schedule, and shall include full compensation for furnishing all labor, materials, tack coat where required, tools, equipment, forming, curing, finishing, dowels (if any), and incidentals to accomplish the work as specified herein, including but not limited to subgrade preparation, and no additional compensation will be allowed therefore.
Bid Item No. 17 – Construct Concrete Cross Gutter and Spandrel This Bid Item shall also include all labor, material and equipment required to construct new concrete cross gutter and/or spandrel for the project. Concrete cross gutter and/or spandrel shall conform to the provisions of Section 201-1 of the Standard Specifications for Public Works Construction and shall be placed in accordance with Section 303-5 of the Standard Specifications for Public Works Construction. Concrete cross gutter and/or spandrel shall be per Standard Plans for Public Works Construction 122-2.
Concrete cross gutter and/or spandrel shall be constructed to the line, grades and design shown in plans to match existing or as directed in the field by the Engineer. The Contractor shall remove and replace any new concrete work with graffiti markings and blemishes at no additional cost to the City.
Payment for Construct Concrete Cross Gutter and Spandrel shall be made at the unit price bid per Square Foot (SF) and shall include full compensation for furnishing all materials, tools, labor and equipment for the completion of the work in place as specified in this contract document and shall include final subgrade preparation, dowel reinforcement, rebars, and no additional compensation shall be allowed therefore.
Payment for 2-foot-wide AC pavement along edge of gutter and spandrel for forming shall be included in Bid Item No. 14 Construct Asphalt Concrete (AC) Base Course and no additional compensation will be allowed.
SP-23
Bid Item No. 18 – Construct Concrete Longitudinal Gutter This Bid Item shall also include all labor, material and equipment required to construct new concrete longitudinal gutter for the project. Concrete longitudinal gutter shall conform to the provisions of Section 201 and 301 of the Standard Specifications for Public Works Construction and shall be placed in accordance with Section 303-5 of the Standard Specifications for Public Works Construction. Concrete longitudinal gutter shall be per Standard Plans for Public Works Construction 122-3.
Concrete shall be Class 520-C-2500 as specified in Section 201-1.1.2 of the Standard Specifications for Public Works Construction.
Concrete longitudinal gutter shall be constructed to the line, grades and design shown in plans to match existing or as directed in the field by the Engineer. The Contractor shall remove and replace any new concrete work with graffiti markings and blemishes at no additional cost to the City.
Payment for Construct Concrete Longitudinal Gutter shall be made at the unit price bid per Linear Foot (LF) and shall include full compensation for furnishing all materials, tools, labor and equipment for the completion of the work in place as specified in this contract document and shall include final subgrade preparation, concrete placement and finishing, curing and protection, disposal of waste material and no additional compensation shall be allowed therefore.
No additional compensation will be made for any work necessary to complete the installation of the concrete longitudinal gutter as shown on the plans, as specified herein, or as directed by the Engineer. Payment for 2-foot-wide AC pavement along edge of gutter for forming shall be included in Bid Item No. 14 Construct Asphalt Concrete (AC) Base Course and no additional compensation will be allowed.
Bid Item No. 19 – Construct Concrete Driveway Approach
This Bid Item shall also include all labor, material and equipment required to construct concrete driveway approach Type “A” for the project as shown on the plans, as directed by the Engineer, and per these special provisions and technical specifications. All concrete work shall conform to the provisions of Section 303-5 of the Standard Specifications for Public Works Construction, Standard Plans for Public Works Construction and the Street Improvement Plans made part of these Specifications. Concrete shall be Class 520-C-2500 as specified in Section 201-1.1.2 of the Standard Specifications for Public Works Construction. Concrete driveway approach shall be per Standard Plans for Public Works Construction (SPPWC) 110-2. Construct Driveway Approach shall include: Saw cut pavement 12” from lip of gutter; remove curb and gutter, curb ramp, and sidewalk; dowel into existing curb and gutter and construct curb and gutter per SPPWC Standard 120-3, access ramp and install cast in place federal yellow detectable warning surface per SPPWC Standard 111-5 and the Street Improvement Plans made part of these Specifications, and sidewalk per SPPWC 113-2.
Concrete Driveway Approach and adjacent curb ramp and sidewalk shall be constructed to the line, grades and design as directed in the field by the Engineer. Existing surfaces to be joined
SP-24
shall be sawcut on a neat, straight line at the join location. The Contractor shall remove and replace any new concrete work with graffiti markings and blemishes at no additional cost to the City.
Detectable warning surface shall be YELLOW and 4’ wide and 3’ long minimum. A sample of material shall be approved by the City of Montebello prior to installation.
The orientation of the dome pattern for all panels shall be parallel with the panel edges. At a minimum the Contractor shall adhere to the truncated dome tile manufacturer's installation requirements including proper surface preparation and protection of the work and surrounding area The manufacturer shall provide a minimum 5-year warranty, guaranteeing replacement when there is a defect in the dome shape, color fastness, sound on cane acoustic quality, or deterioration of the detectable warning surface. The warranty period shall commence on the date of acceptance.
NOTE: Detectable Warning Surface Materials shall be installed across the full width and full depth of the ramp, in conformance with SPPWC Standard Plan 111- 5 and latest ADA requirements.
Where applicable, the Contractor shall be responsible for matching existing architectural treatment including, but not limited to stamped and/or colored concrete and replacing in kind, including pattern, color, finish, scoring, and jointing. Transitions to adjacent decorative concrete shall be uniform and seamless in appearance.
Payment for Construct Concrete Driveway Approach construction shall be made at the unit price bid per Square Foot (SF) and shall include full compensation for furnishing all materials, tools, labor and equipment, including but not limited to detectable warning surface, sand and dowel bars, backfilling, grading, compacting, forming, pouring, finishing, hauling, proper disposing, and incidentals for the completion of the work in place as specified in this contract document and shall include final subgrade preparation, and no additional compensation shall be allowed therefore.
Payment for 2-foot-wide AC pavement along the curb and gutter for forming shall be included in Bid Item No. 14 Construct Asphalt Concrete (AC) Base Course and no additional compensation will be allowed.
Bid Item No. 20 – Construct Concrete Alley Intersection Approach This Bid Item shall also include all labor, material and equipment required to construct concrete alley intersection approach for the project as shown on the plans, as directed by the Engineer, and per these special provisions and technical specifications. All concrete work shall conform to the provisions of Section 303-5 of the Standard Specifications for Public Works Construction, Standard Plans for Public Works Construction and the Street Improvement Plans made part of these Specifications. Concrete shall be Class 520-C-2500 as specified in Section 201-1.1.2 of the Standard Specifications for Public Works Construction. Concrete alley intersection approach shall be per Standard Plans for Public Works Construction 130-3. Construct Alley Intersection
SP-25
Approach shall include: Remove curb and gutter, curb ramp, and sidewalk; Dowel into existing curb and gutter and construct curb and gutter, access ramp, and sidewalk per Standard Plans for Public Works Construction 111-5; Install cast in place federal yellow detectable warning surface.
Concrete Alley Intersection Approach and adjacent curb ramp and sidewalk shall be constructed to the line, grades and design as directed in the field by the Engineer. Existing surfaces to be joined shall be sawcut on a neat, straight line at the join location. The Contractor shall remove and replace any new concrete work with graffiti markings and blemishes at no additional cost to the City.
Detectable warning surface shall be YELLOW and 4’ wide and 3’ long minimum. A sample of material shall be approved by the City of Montebello prior to installation.
The orientation of the dome pattern for all panels shall be parallel with the panel edges. At a minimum the Contractor shall adhere to the truncated dome tile manufacturer's installation requirements including proper surface preparation and protection of the work and surrounding area The manufacturer shall provide a minimum 5-year warranty, guaranteeing replacement when there is a defect in the dome shape, color fastness, sound on cane acoustic quality, or deterioration of the detectable warning surface. The warranty period shall commence on the date of acceptance.
NOTE: Detectable Warning Surface Materials shall be installed across the full width and full depth of the ramp, in conformance with SPPWC Standard Plan 111- 5 and latest ADA requirements.
Payment for Construct Concrete Alley Intersection Approach construction shall be made at the unit price bid per Square Foot (SF) and shall include full compensation for furnishing all materials, tools, labor and equipment, including but not limited to detectable warning surface, sand and dowel bars, backfilling, grading, compacting, forming, pouring, finishing, hauling, proper disposing, and incidentals for the completion of the work in place as specified in this contract document and shall include final subgrade preparation, and no additional compensation shall be allowed therefore.
Payment for 2-foot-wide AC pavement removal and replacement along curb and gutter for forming shall be included in Bid Item No. 4 Remove Existing Asphalt Concrete (AC) Pavement and 14 Construct Asphalt Concrete (AC) Base Course respectively and no additional compensation will be allowed.
Bid Item No. 21 – Adjust to Grade, Utility Per Plan
This Bid Item shall also include all labor, material and equipment required to construct concrete alley intersection approach for the project as shown on the plans, as directed by the Engineer, and per these special provisions and technical specifications. Adjustment work shall conform to Section 402 of the Standard Specifications. The Contractor is to contact the utility owner and determine if the utility owner wants the Contractor to lower and raise the utility per plan or the
SP-26
utility owner will do so on their own. In the latter case the Contractor will not be paid for this work.
All existing utility covers that can be lowered and raised shall be lowered prior to cold milling/removal and adjusted to finished grade by the Contractor or the Utility Owner. The Contractor shall contact the utility or substructure owner organizations to arrange for adjustment of their respective facilities a minimum of two (2) working days prior to paving operations in accordance with Section 402 of the Standard Specifications.
Adjustment of existing water valve sleeves shall also be performed after finish paving and covers are to be painted should the Utility Owner want the cover to be painted. The Utility Owner will let the City know what color is to be used.
Payment for Adjust to Grade, Utility Per Plan shall be based on Each (EA) Unit Price basis and shall be considered full compensation of all costs associated with their adjustment including labor, materials, equipment, coordination, incidentals for the completion of the work in place as specified in this contract document, and no additional compensation shall be allowed therefore.
Bid Item No. 22 – Adjust to Grade, Manhole Rim and Cover This Bid Item shall include all labor, equipment and materials to adjust existing utility manholes frames and covers within the project limits to match finished grade if required. The work shall be performed in accordance with the provisions of Subsection 301-1.6 and Subsection 302-5.8 of the Standard Specifications for Public Works Construction and per Standard Plans for Public Works Construction.
All existing covers that can be lowered and raised shall be lowered prior to cold milling/removal and adjusted to finished grade by the Contractor or by the Utility Owner for the Contractor. For utility frames and covers under the jurisdiction of Verizon, AT&T, Edison, Los Angeles County Flood Control District, Los Angeles County Sanitation Districts, and County Sewer Maintenance Districts, the Contractor shall contact these organizations to arrange for adjustment of their respective facilities a minimum of four (4) working days prior to cold milling/paving operations in accordance with Section 301-1.6 of the Standard Specifications.
The adjustment of existing manholes/vaults to finished grade shall be performed after finish paving. The removal or addition of grade rings shall be required to facilitate adjustment. Frame and covers shall be thoroughly cleaned and reset to finished grade by cutting pavement one foot outside the limits of the frame and cover. Said cut shall be neat and uniform.
This Bid Item applies only to existing manholes requiring adjustment to finished grade. Proposed manholes constructed as part of Bid Item No. 25 Construct Concrete Sewer Manhole Per SPPWC STD. 200-4 and Bid Item No. 29 Construct Concrete Sewer Manhole Per LACSD STD S-A-204 shall be adjusted to finished grade at the time of installation. No separate payment will be made for grade adjustment of proposed manholes.
SP-27
Payment for Adjust to Grade, Manhole Rim and Cover shall be paid for at the contract unit price per Each (EA) and shall be considered full compensation for labor and furnishing and placing all forms, materials, construction and expansion joints, curing compounds and equipment to complete the construction is considered as included in the price paid, and no additional compensation will be allowed therefor. Where the manhole frame and cover is performed by the utility owner, no compensation will be made to Contractor.
Bid Item No. 23–Install Traffic Signal Loop Detectors and Connect to DLC All equipment, materials, and components for traffic detector loops and the installation thereof, shall conform to the latest edition of the Caltrans Standard Plans and Standard Specifications, Section 86, ‘Signals and Lighting”, latest edition, except as noted in the Special Provisions and on the plans. These plans and specifications are hereinafter referred to as State Standard Plans and State Standard Specifications. Copies of these documents are available from Caltrans, District 7 office at 100 S. Main Street, Los Angeles, CA 90012 or the State Offices of Caltrans at 1900 Royal Oaks Drive, Sacramento, CA 95815 (916) 455-3520.
Traffic Signal Loop Detectors shall be Type E (6’ diameter) per Caltrans Standard Plans ES-5A and ES-5B.
Contractor, as directed by City Engineer, shall remove existing loops and cut in new loops in AC areas.
Residue resulting from slot cutting/cleaning operations shall not be permitted to flow across shoulders or lanes occupied by public traffic and shall be removed from the pavement surface.
Contractor shall obtain approval from the City Engineer for exact location of new loop detector prior to final placement. Perform preliminary striping layout prior to loop detector layout.
The Contractor shall test the new detectors with a motor driven cycle, as defined in the California Vehicle Code, that is licensed for street use by the Department of Motor Vehicles. The unladed weight of the vehicle shall not exceed 220 pounds, and the engine displacement shall not exceed 100 cubic centimeters. Special features, components, or vehicles designed to activate the detector will not be permitted. The Contractor shall provide an operator who shall drive the motor driven cycle through the response or detection area of the detector at not less than three (3) miles per hour or more than seven (7) miles per hour. The detector sensor unit shall provide the required output in response to this test.
Payment for Install Traffic Signal Loop Detectors and Connect to DLC shall be at the contract unit price per Each (EA). Unit Price basis installed complete and operational and shall be considered full compensation for furnishing all labor, tools, equipment, materials, coordination and incidentals, and for doing all the work involved in furnishing, installing, removals, salvaging, filling, traffic detector loops and appurtenances, providing temporary modifications to traffic signal system during construction as required, restoration work, operationally complete in place, as shown on plans, and as specified in the special provisions, and as directed by the City Engineer.
SP-28
Bid Item No. 24 – Traffic Striping, Markings, Signing, and Curb Painting Traffic Signing, Striping, Markings, and curb painting as shown on Contract Drawings shall conform to the Standard Specifications of the State of California (latest edition), Department of Transportation, Sections No. 82, 84 and 85 (CALTRANS) and also as modified below.
Traffic stripes, pavement markings of arrows, symbols, numbers and words, shall conform to the California Department of Transportation Standard Specifications: Section 84-2 Thermoplastic Traffic Stripes and Pavement Markings, latest edition.
For existing striping or markings shown to be replaced outside of new pavement area and on existing concrete surface, Contractor shall remove by wet sandblasting only all existing striping/legends/markings. Raised dots and markings shall be removed by grinding.
Prior to project grinding and removal work, Contractor shall video all existing markings, painting and pavement devices for use in carrying out this Bid Item.
Raised pavement markers other than blue hydrant markers shall conform to the California Department of Transportation Standard Specifications Section 85, current edition, and shall be of type as matching the Standard Specifications.
For all striping and street painted legend, contractor is to use City furnished stencils available at the Public Works Yard.
The Contractor shall furnish the necessary control points for all striping and markings, and shall be responsible for the completeness and accuracy thereof to the satisfaction of the City of Montebello.
Painted and raised pavement marker removal shall conform to Section 85 of the Caltrans Standard Specifications, current edition. All residue remaining as a part of the removal operations shall be removed from the site.
Layout shall be approved, in writing, by the Engineer prior to placing Thermoplastic, curb painting and markings.
Thermoplastic Pavement striping and markings are per Caltrans Standard Plans.
Markings, as used in these Specifications, include both lines and miscellaneous markings applied to the pavement surface, painting of red curb and the installation of raised pavement markers.
Materials and installation for painted and raised pavement markers shall conform to Section 84 and 85 of Caltrans Standard Specifications, current edition.
The Contractor shall provide cat tracking for the centerline and lane lines the same day, following paving operations. Reflectorized “slurry tabs” may be used in lieu of painted cat tracking.
SP-29
The Contractor shall refresh paint on red, yellow and blue curbs within the limit of the project and also to include all existing striping 100’ in each direction on all intersections adjacent to the proposed improvements.
Place Raised Blue Reflective for Fire Hydrant
Two-Way Blue Reflective Fire Hydrant Raised Pavement Markers installation are a part of this item and shall conform to the Standard Specification Section 312 Pavement Marker Placement and Removal and shall be in accordance with the Caltrans Traffic Manual Section 6 “Markings” for each fire hydrant. These are not shown on the Contract Drawings, upon placement of final striping, the contractor shall locate all fire hydrants and place the two-way blue reflective markers.
Payment for Traffic Striping/Signing/Markings shall be paid for at the contract unit price per Lump Sum (LS) and shall be considered full compensation for furnishing all labor, materials (including adhesives, glass beads, and paint), tools, equipment and incidentals necessary to perform all work, involved in, or appurtenant to the installation of pavement striping, parking stall lines, raised reflective pavement markers, painting curbs, blue markers, including removal and installation of traffic signs and posts as indicated, removal of existing delineators, complete in place for the width specified, and pavement markings of arrows, symbols, numbers and words, as required by the Project Specifications and no additional compensation will be allowed. All existing striping 100 feet in each direction on all intersections adjacent to the proposed improvements shall be restriped, remarked and repainted.
Bid Item No. 25 – Construct Concrete Sewer Manhole Per SPPWC STD. 200-4 This Bid Item shall also include all labor, material and equipment required to install and construct Concrete Sewer Manhole for the project as shown on the plans, as directed by the Engineer, and Standard Specifications and these Special Provisions.
All concrete work shall conform to the provisions of Section 201 and 215 of the Standard Specifications for Public Works Construction, Standard Plans for Public Works Construction and the Sewer Improvement Plans made part of these Specifications. Concrete shall be Class 520-C2500 as specified in Section 201-1.1.2 of the Standard Specifications for Public Works Construction. Construct Concrete Sewer Manhole shall be per Standard Plans for Public Works Construction 200-4.
The Contractor shall ensure that there is no stoppage of sewer service at the end of each working day. For existing sewer manholes that are removed, the Contractor shall be fully responsible for maintaining uninterrupted flow and service to all upstream users. Temporary bypass pumping or diversion systems shall be implemented as necessary to ensure continuous operation. No shutdown of sewer service will be permitted without prior written authorization from the Engineer.
Rim elevations for proposed sewer manholes shall be set to match the finished surface course at the time of installation. No additional adjustment of the rim and cover will be performed or compensated. Final grade rim elevations shall match the approved plans.
SP-30
Measurement and Payment for Construct Concrete Sewer Manhole Per SPPWC STD. 200-4 will be at the contract unit price bid per Each (EA) and shall be considered full compensation for furnishing labor, materials, equipment, excavation, installation, backfill, compaction, shoring, connection to new and/or existing sewer main, fittings, flexible joints, joint sealants, wyes, and CCTV inspection to complete the construction of each item as shown on plans and no additional compensation will be allowed therefor.
Bid Item No. 26 – Install 10” PVC SDR-35 Sewer Pipe
This Bid Item shall also include all labor, material and equipment required to install and construct 10-inch PVC sewer main for the project as shown on the plans, as directed by the Engineer, and Standard Specifications and these Special Provisions.
All work shall conform to the provisions of Section 207 and 306 of the Standard Specifications for Public Works Construction, Standard Plans for Public Works Construction and the Sewer Improvement Plans made part of these Specifications. Polyvinyl Chloride (PVC) Sewer pipe shall be SDR-35 and adhere to Standard Specifications for Public Works Construction subsection 207-17. Pipe installation shall be per City of Montebello Standard Plan 160A and the Sewer Improvement Plans made part of these Specifications. All pipe shall be tested per Standard Specifications for Public Works Construction subsection 207-17.4.
Prior to removal or abandonment of the existing sewer mainline, the Contractor shall be responsible for jetting and cleaning the existing sewer main to facilitate a complete and unobstructed closed-circuit television (CCTV) inspection. The Contractor shall identify and record the location, size, and condition of all existing sewer laterals connected to the existing mainline. CCTV logs and video shall be submitted to the Engineer for review 10 working days prior to commencing sewer construction. The Contractor shall notify the Engineer of any defects, blockages, or unusual conditions discovered during cleaning or inspection.
The Contractor shall ensure that there is no stoppage of sewer service at the end of each working day. For reaches of existing sewer main that are removed or abandoned, the Contractor shall be fully responsible for maintaining uninterrupted flow and service to all upstream users.
Temporary bypass pumping or diversion systems shall be implemented as necessary to ensure continuous operation. No shutdown of sewer service will be permitted without prior written authorization from the Engineer.
Payment for Install 10” PVC SDR-35 Sewer Pipe construction shall be made at the unit price bid per Linear Foot (LF) and shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in installing and backfilling, preparation and placement of bedding, complete in place, including pipe, fittings, wye and band coupling, trench excavation and backfill, trench safety, and CCTV inspection of newly installed pipeline, as shown on the plans, as specified in these specifications, and as directed by the Engineer.
Removal and restoration of AC pavement work is not a part of this bid item. The work shall be included in Bid Item No. 4 Remove Existing Asphalt Concrete (AC) Pavement and Bid Item
SP-31
No. 14 Asphalt Concrete Pavement respectively and will be paid for under the respective bid items.
Removal and restoration of concrete pavement work is not a part of this bid item. The work shall be included in Bid Item No. 5 Remove Concrete Pavement and Bid Item No. 16 Construct Concrete Pavement respectively and will be paid for under the respective bid items.
Payment for 1-foot-wide Cold Mill AC pavement removal and 2-inch AC Surface Course replacement along trench limits shall be included in Bid Item No. 12 Cold Mill Exist Asphalt Concrete (AC) Pavement (2") And Bid Item No. 13 Construct 2" Conventional AC Surface Course (Type C2-PG 64-10) respectively and no additional compensation will be allowed.
Bid Item No. 27 – Install 12” PVC SDR-35 Sewer Pipe
This Bid Item shall also include all labor, material and equipment required to install and construct 12-inch PVC sewer main for the project as shown on the plans, as directed by the Engineer, and Standard Specifications and these Special Provisions.
Prior to installation of new sewer main, the Contractor shall be responsible for jetting and cleaning the existing sewer main to facilitate a complete and unobstructed closed-circuit television (CCTV) inspection. The Contractor shall identify and record the location, size, and condition of all existing sewer laterals connected to the existing mainline. CCTV logs and video shall be submitted to the Engineer for review 10 working days prior to commencing sewer construction. The Contractor shall notify the Engineer of any defects, blockages, or unusual conditions discovered during cleaning or inspection.
The Contractor shall ensure that there is no stoppage of sewer service at the end of each working day. For reaches of existing sewer main that are removed or abandoned, the Contractor shall be fully responsible for maintaining uninterrupted flow and service to all upstream users.
Temporary bypass pumping or diversion systems shall be implemented as necessary to ensure continuous operation. No shutdown of sewer service will be permitted without prior written authorization from the Engineer.
All work shall conform to the provisions of Section 207 and 306 of the Standard Specifications for Public Works Construction, Standard Plans for Public Works Construction and the Sewer Improvement Plans made part of these Specifications. Polyvinyl Chloride (PVC) Sewer pipe shall be SDR-35 and adhere to Standard Specifications for Public Works Construction subsection 207-17. Pipe installation shall be per City of Montebello Standard Plan 160A and the Sewer Improvement Plans made part of these Specifications. All pipe shall be tested per Standard Specifications for Public Works Construction subsection 207-17.4.
Payment for Install 12” PVC SDR-35 Sewer Pipe construction shall be made at the unit price bid per Linear Foot (LF) and shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in installing and backfilling, preparation and placement of bedding, complete in place, including pipe, fittings, wye and band coupling, trench excavation and backfill, trench safety, and CCTV inspection of
SP-32
newly installed pipeline, as shown on the plans, as specified in these specifications, and as directed by the Engineer.
Removal and restoration of AC pavement work is not a part of this bid item. The work shall be included in Bid Item No. 4 Remove Existing Asphalt Concrete (AC) Pavement and Bid Item No. 14 Asphalt Concrete Pavement respectively and will be paid for under the respective bid items.
Removal and restoration of concrete pavement work is not a part of this bid item. The work shall be included in Bid Item No. 5 Remove Concrete Pavement and Bid Item No. 16 Construct Concrete Pavement respectively and will be paid for under the respective bid items.
Payment for 1-foot-wide Cold Mill AC pavement removal and 2-inch AC Surface Course replacement along trench limits shall be included in Bid Item No. 12 Cold Mill Exist Asphalt Concrete (AC) Pavement (2") And Bid Item No. 13 Construct 2" Conventional AC Surface Course (Type C2-PG 64-10) respectively and no additional compensation will be allowed.
Bid Item No. 28 – Connect to Existing Sewer Main
This Bid Item shall also include all labor, material and equipment required to install and construct Connect to Existing Sewer Main for the project as shown on the plans, as directed by the Engineer, and Standard Specifications and these Special Provisions.
All work shall conform to the provisions of Section 207 and 306 of the Standard Specifications and the Sewer Improvement Plans made part of these Specifications. Contractor to ensure that a watertight connection is made using a tee or wye fitting, saddled connection with grout, or other method as approved by the Engineer. The Contractor shall provide temporary flow control or bypass pumping where required to maintain sanitary sewer service during construction. No connections shall be made without prior approval from the Engineer and successful inspection of the pipe and materials.
Measurement and Payment for Connect to Existing Sewer Main will be at the contract unit price bid per Each (EA) and shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in connection of proposed pipe to existing main including; pipe (size per plan), concrete encasement (if needed), testing and CCTV inspection, fittings, wye and band coupling, as shown on the plans, as specified in these specifications, and as directed by the Engineer.
Bid Item No. 29 – Construct Concrete Sewer Manhole Per LACSD STD. S-A-204 This Bid Item shall also include all labor, material and equipment required to install and construct Concrete Sewer Manhole for the project as shown on the plans, as directed by the Engineer, and Standard Specifications and these Special Provisions.
All concrete work shall conform to the provisions of Section 201 of the Standard Specifications for Public Works Construction, Standard Plans for Public Works Construction and the Sewer
SP-33
Improvement Plans made part of these Specifications. Concrete shall be Class 520-C-2500 as specified in Section 201-1.1.2 of the Standard Specifications for Public Works Construction.
Construct Concrete Manhole shall be per Los Angeles County Sanitation District Standard Plans S-A-204 and LACSD Amendments to the Standard Specifications for Public Works Construction.
The Contractor shall furnish and install a minimum two (2) feet of vitrified clay pipe (VCP) at each manhole connection to Los Angeles County Sanitation District (LACSD) sewer mains. The VCP shall match the size and alignment shown on the approved Sewer Improvement Plans.
Where applicable, new manholes along the LACSD trunk facility will be required cut the CIPP liner edges which must be sealed in accordance with section 500-5.5.9 of the LACSD Amendments to the Standard Specifications. The sealant material shall be submitted to LACSD for review prior to commencing work.
Rim elevations for proposed sewer manholes shall be set to match the finished surface course at the time of installation. No additional adjustment of the rim and cover will be performed or compensated. Final grade rim elevations shall match the approved plans.
Measurement and Payment for Construct Concrete Sewer Manhole Per LACSD STD. S-A204 will be at the contract unit price bid per Each (EA) and shall be considered full compensation for furnishing labor, materials, equipment, excavation, installation, backfill, compaction, shoring, vitrified clay pipe, connection to new and/or existing sewer main, fittings, flexible joints, joint sealants, wyes, and CCTV inspection to complete the construction of each item as shown on plans and no additional compensation will be allowed therefor.
Bid Item No. 30 – Connect Existing Sewer Lateral to Proposed Sewer Main This Bid Item shall include all labor, equipment, and materials required to locate, expose, and connect existing house sewer laterals to the proposed sewer main as shown on the Plans or as directed by the Engineer. All work shall conform to the applicable provisions of Section 500-1, 500 of the Standard Specifications and per Standard Plans for Public Works Construction 222-2 including trenching, backfill, pipe connections, and surface restoration.
Contractor shall be responsible for locating and verifying the alignment and depth of each existing lateral prior to excavation. All connections shall be made watertight and compatible with materials of the existing lateral and proposed sewer main.
Where required, the Contractor shall extend the existing lateral to the proposed main using new pipe of the same size and material as the existing lateral unless otherwise shown on the Plans.
Pipe materials and installation shall conform to Sections 207 of the Standard Specifications. The connection shall maintain proper alignment and slope to ensure uninterrupted gravity flow.
Measurement and Payment for Connect Existing Sewer Lateral to Proposed Sewer Main will be at the contract unit price bid per Each (EA) and shall be considered full compensation for furnishing labor, materials, equipment, locating, trenching, shoring as needed, backfilling,
SP-34
compaction, coordination with property owners, and disposal to complete the construction of each item as shown on plans and no additional compensation will be allowed therefor.
Bid Item No. 31 – Rechannelize Existing Sewer Manhole Base This Bid Item shall include all labor, equipment, and materials required to Rechannelize Existing Sewer Manhole Base, as necessary to correct invert elevations and accommodate new or revised sewer alignments. The work shall be performed in accordance with the provisions of Section 500 of the Standard Specifications and all applicable manufacturer recommendations for repair materials.
Rechannelization shall be performed using high-strength, non-shrink grout or approved sewergrade repair mortar in accordance with Section 201-5 of the Standard Specifications. Prior to placement, all surfaces shall be cleaned and properly prepared to ensure bond strength. A bonding agent conforming to Section 201-3 of the Standard Specifications shall be used where recommended by the product manufacturer.
Measurement and Payment for Rechannelize Existing Sewer Manhole Base will be at the contract unit price bid per Each (EA) and shall be considered full compensation for furnishing labor, materials, equipment, bypassing and / or plugging of existing sewer, demolition, forming, placing, and finishing, and disposal to complete the construction of each item as shown on plans and no additional compensation will be allowed therefor.
Bid Item No. 32 – Construct Brick and Mortar Plug
This Bid Item shall include all labor, equipment, and materials required to Construct a Brick and Mortar Plug within an existing or new sewer main as shown on the Plans or as directed by the Engineer. The plug shall be watertight and capable of withstanding anticipated hydrostatic and surcharge pressures. Work shall be performed in accordance with the applicable provisions of Section 500 and Section 208-2.3 of the Standard Specifications.
The plug shall be constructed using sewer-grade, solid clay bricks set in Type II Portland cement mortar conforming to Section 201-1.2 of the Standard Specifications. Bricks shall be laid with fully mortared joints, with no voids, and shall be keyed into the pipe walls to ensure a secure and permanent seal. Minimum thickness of the brick plug shall be 12 inches.
Prior to construction, the interior of the pipe at the plug location shall be cleaned of all debris, grease, and water. Where flow is present, the Contractor shall provide temporary flow diversion or bypass pumping to create dry working conditions. The downstream pipe shall be protected from mortar intrusion.
Measurement and Payment for Construct Brick and Mortar Plug will be at the contract unit price bid per Each (EA) and shall be considered full compensation for furnishing labor, materials, equipment, flow diversion, and disposal to complete the construction of each item as shown on plans and no additional compensation will be allowed therefor.
SP-35
Bid Item No. 33 – Abandon Existing Sewer Manhole
This Bid Item shall include all labor, material, and equipment required to abandon existing sewer manholes within the project limits in accordance with the plans, as directed by the Engineer, and as required by the Los Angeles County Sanitation Districts (LACSD) Standard Plan S-a-218 and the LACSD Amendments to the Standard Specifications for Public Works Construction.
Abandonment shall be performed in accordance with LACSD Standard Plan S-a-218 and shall include, but not be limited to, removal of cone section if required, breaking through the sides of the manhole to allow drainage, manhole base channelization, and backfilling the structure with one-sack slurry or sand-cement slurry as specified by LACSD. Existing sewer mains to be abandoned or removed that entered or exited the abandoned manhole shall be properly bulkheaded, plugged, or capped as directed and approved by the Engineer and shown on the plans. All materials removed from the manhole shall be properly disposed of off-site at the Contractor’s expense unless otherwise directed by the Engineer.
Manhole base channelization work shall be performed in accordance with the provisions of Section 500 of the Standard Specifications and all applicable manufacturer recommendations for repair materials. Channelization shall be performed using high-strength, non-shrink grout or approved sewer-grade repair mortar in accordance with Section 201-5 of the Standard Specifications. Prior to placement, all surfaces shall be cleaned and properly prepared to ensure bond strength. A bonding agent conforming to Section 201-3 of the Standard Specifications shall be used where recommended by the product manufacturer.
The Contractor shall coordinate all abandonment work with LACSD and shall comply with their requirements and inspection protocols. All abandonment work shall be scheduled and approved at least forty-eight (48) hours in advance. The Contractor shall be responsible for any temporary flow control, bypass pumping, or diversion required to perform the work.
Measurement and Payment for Abandon Existing Sewer Manhole will be at the contract unit price bid per Each (EA) and shall be considered full compensation for furnishing all labor, materials, equipment, coordination with LACSD, furnishing and installing half pipe segment, removal and disposal, plugging or capping of manhole channel openings, joint sealant, flow control, bypass as needed, forming, placing, finishing, and backfilling with slurry to complete the work as shown on the plans and no additional compensation will be allowed therefor.
SP-36
SPECIAL PROVISIONS
PART 4 – EXISTING IMPROVEMENTS
FOR
MONTEBELLO DOWNTOWN SEWER INFRASTRUCTURE PROJECT
(WHITTIER BLVD FROM MONTEBELLO BLVD TO 1ST ST &
PALM PL FROM SPRUCE ST TO PALM DR)
C.I.P. No. 919
IN THE CITY OF MONTEBELLO
PART 4 – EXISTING IMPROVEMENTS
The work required to be performed for the completion of the Project shall be performed in accordance with the Standard Specifications for Public Works Construction (SSPWC), latest Edition, in so far as the same applies to the Project, the Standard Plans and the Contract Documents.
For purposes of this Project, Part 4 of the SSPWC, is amended, as follows:
SECTION 400 – PROTECTION AND RESTORATION
400-1 GENERAL.
The second paragraph of Subsection 400-1 of the Standard Specifications is hereby deleted and replaced with the following:
The Contractor shall relocate, repair, replace or re-establish all existing improvements within the project limits which are not designated for removal (e.g., curbs, sidewalks, driveways, fences, walls, sprinkler systems, signs, utility installations, pavements, structures, etc.) which are damaged or removed as a result of the operations or as required by the Plans and Specifications. The Contractor shall make the effort to repair all sprinklers, pipe, etc by the end of the day.
Where existing traffic striping, pavement markings, and curb markings are damaged or their reflectivity reduced by the Contractor’s operations, such striping or markings shall also be considered as existing improvements and the Contractor shall repaint or replace such improvements. Prior to start of construction, Contractor and City Inspector shall visit and survey the site, and agree on locations outside the work limits and adjacent to it, and along truck routes where the traffic striping, pavement markings, and curb markings are in good condition prior to start of construction, and locations where the markings are faded prior to start of construction.
Contractor shall restripe or clean to the satisfaction of the City, all pavement markings and striping in the vicinity of the project and on truck routes damaged and soiled due the Contractor’s work.
SP-37
Relocations, repairs, replacements or re-establishments shall be at least equal to the existing improvements and shall match such improvements in finish and dimensions unless otherwise specified.
All existing improvements including Fence/Wall/Gates/Plants/Grass/Trees/Irrigation Systems/etc. that might be damaged during construction should be videotaped and it is Contractor’s responsibility to protect all existing adjacent features such as landscaping, irrigation system, property’s fence/wall/gates, curb and gutter, pull boxes, utility boxes, and etc. in place per section 400-1 of Standard Specifications for Public Works Construction. All damages to these items shall be fixed to the satisfaction of the City of Montebello without any additional compensation.
All costs to the Contractor for protecting, removing, restoring, relocating, repairing, replacing, or re-establishing existing improvements shall be included in the bid. 400-2 PERMANENT SURVEY MARKERS.
The following is added this this subsection of the Standard Specifications:
The Contractor shall be responsible for the protection and preservation of existing permanent survey monuments and benchmarks during construction. Damaged or lost monuments and benchmarks shall be restored to existing condition by a Registered Civil Engineer or a Land Surveyor licensed by the State of California at no increase in cost to the City.
The Contractor, at its own expense, shall employ a qualified surveyor to perform all survey work required for the completion of the project as specified in the plans and these specifications, comply with the requirements of Section 8771 of the Land Surveyors Act as amended and submit the documents from the County Surveyor as proof of compliance to the City of Montebello. 400-3 PAYMENT
This subsection of the Standard Specifications is hereby deleted and replaced with the following:
No separate or additional payment will be made for 1) protection of existing improvements, 2) restoration of existing improvements and 3) permanent survey markers. All costs to the Contractor for protecting, removing, restoring, relocating, repairing, replacing, or re-establishing existing improvements shall be included in the bid.
SECTION 402 – UTILITIES
402-1 LOCATION.
402-1.1 General.
The following is hereby added to this subsection of the Standard Specifications:
SP-38
The location and existence of any underground utility or substructure was obtained from a search of available records. No guarantee is made or implied that the information is complete or accurate.
It shall be the Contractor’s responsibility alone to determine the exact location of underground utilities or substructures of every nature and to protect them from damage. The Contractor shall excavate and expose all high-risk underground facilities. The Contractor shall notify the owners of all known utilities and substructures as set forth in the Specifications.
NOTIFICATION
The Contractor shall notify the City of Montebello and the owners of all utilities and substructures not less than 48 hours (2 working days) prior to starting construction. The following list of names and telephone numbers is intended for the convenience of the Contractor and is not guaranteed to be complete or correct:
Central Basin
MWD
Isabelle
Guido
6252 Telegraph Rd,
Commerce CA 90040
(323) 201-5541
[email protected]
Crimson
Pipeline LP
Jeff Kohn 3760 Kilroy Airport Way
Suite 300
Long Beach, CA 90806
(562) 822-5656
[email protected]
MCI
(Verizon
Business)
Investigation
s
400 International Pkwy
Richardson, TX 75081
[email protected]
City of
Montebello
Sewer
Juan
Hernandez
1600 W Beverly Bl
Montebello, CA 90640
[email protected]
Montebello
Land & Water
Company
Brett Ommen 1600 W Beverly Bl
Montebello, CA 90640
(714) 334-5702
[email protected]
Crown Castle Michael
Moats
1500 Corporate Dr
Canonsburg, PA 15317
(949) 936-0043
[email protected]
Redflex
Traffic
Systems
Jerry Newton 5651 W Talavi Blvd
Suite 200
Glendale, AZ 85306
(800) 568-8405
[email protected]
[email protected]
SoCalGas
Distribution
Belvedere
Dan Garcia 701 N Long Beach Blvd
Compton, CA 90221
(213) 231-8183
[email protected]
Charter /
Spectrum -
Irwindale
Jose Munoz 4781 Irwindale Ave
Irwindale, CA 91706
(626) 430-3351
[email protected]
SCE Trans
Telecom,
Utiliquest for
SCE Dist -
Metro East &
West Reg
Menifee
Engineering
Service
(#241479P)
14005 S Benson Ave
Chino, CA 91710
(951) 928-8290
SP-39
CITY POLICE AND FIRE DEPARTMENT Police: (323) 887-1313
Fire: (323) 887-4510
UNDERGROUND SERVICE ALERT (800) 422-4133 Tel
(909) 808-8101 Fax
TRASH COLLECTORS – ATHENS DISPOSAL (626) 336-6100
STREET SWEEPING – NATIONWIDE (562) 860-0604
MONTEBELLO UNIFIED SCHOOL DISTRICT (323) 887-7900
MONTEBELLO TRANSIT (323) 558-1625
EMERGENCY INFORMATION
The names addresses and telephone numbers of the Contractor and subcontractors, or their representatives, shall be filed with the Engineer and the City Police Department prior to beginning work.
402-1.2 Payment
Payment for provisions under section 402-1 of the Standard Specifications shall be considered included in the various items of the work. No separate payment will be authorized.
SP-40
SPECIAL PROVISIONS
PART 6 – TEMPORARY TRAFFIC CONTROL
FOR
MONTEBELLO DOWNTOWN SEWER INFRASTRUCTURE PROJECT
(WHITTIER BLVD FROM MONTEBELLO BLVD TO 1ST ST &
PALM PL FROM SPRUCE ST TO PALM DR)
C.I.P. No. 919
IN THE CITY OF MONTEBELLO
PART 6 – TEMPORARY TRAFFIC CONTROL
The work required to be performed for the completion of the Project shall be performed in accordance with the Standard Specifications for Public Works Construction (SSPWC), latest Edition, in so far as the same applies to the Project, the Standard Plans and the Contract Documents.
For purposes of this Project, Part 6 of the SSPWC, is amended, as follows:
PART 6 – TEMPORARY TRAFFIC CONTROL
SECTION 600 – ACCESS
600-1 GENERAL.
The following is added this this subsection of the Standard Specifications:
The Contractor shall notify the occupants of all affected properties in writing at least forty-eight hours (2 working days) prior to any temporary obstruction of access. 600-2 VEHICULAR ACCESS.
The following is added this this subsection of the Standard Specifications:
Vehicular access to the property line shall be maintained except as required for construction for a reasonable period of time. No overnight closure of any driveway will be allowed except as permitted by the Engineer.
In cases where driveways require replacement. Where a property has two driveways, only one driveway at a time can be closed for replacement. Where a single driveway to a property has a considerable width, half of the driveway is to be closed, worked on and reopened for usage before the other half of the driveway can be worked on.
SP-41
All driveways have to be open for access during project non-construction hours and days which may require use of plating and other devices or methods.
No driveway can be worked on until the owner/tenant has been informed in writing with five (5) working days’ notice of the scheduled work and has agreed to the planned schedule of the Contractor.
600-3 PEDESTRIAN ACCESS.
The following is added this this subsection of the Standard Specifications:
Under situations of sidewalk closure to pedestrians, the Contractor shall post advance notice on barricades to direct pedestrian to use the sidewalk on the opposite side of the street or the Contractor may elect to provide continuous K-rail in the curb lane to allow pedestrians to walk in the curb lane behind the K-rail. Any and all devices such as plates, barricades, K-rails and notices shall be continuously maintained for pedestrian and vehicle safety. No curb lanes shall be closed during non-working days of the week. Appropriate advance warning signs shall be continuously maintained as needed during the project. All such devices, warning signs and interruptions of normal vehicle lanes, parking lanes and pedestrian walkways shall be shown on the Traffic Control Plan for advance approval by the City.
SECTION 601 – TEMPORARY TRAFFIC CONTROL FOR CONSTRUCTION AND
MAINTENANCE WORK ZONES
601-1 GENERAL.
The following is added this this subsection of the Standard Specifications:
At least one twelve-foot-wide traffic lane shall be provided for each direction of travel on all arterial streets at all times except as permitted by the Engineer. With previous authorization from the City, the Contractor can provide one traffic lane on a single direction on residential streets, during construction hours.
Clearances from traffic lanes shall be five feet to the edge of any excavation and two feet to the face of any curb, pole, barricade, delineator, or other vertical obstruction.
Any striped roadway shall be delineated by the Contractor with temporary raised reflective markers when it is to be left un-striped overnight.
Street closures will not be allowed except as specifically permitted by the Engineer. 601-2 TEMPORARY TRAFFIC CONTROL PLAN (TCP)
601-2.1 General
The following is added this this subsection of the Standard Specifications:
SP-42
At the Pre-Construction meeting, the Contractor shall submit to the Engineer a detailed traffic control plan per section 601 of the Standard Specifications and construction sequencing for the project. The plan shall include drawings as necessary to clearly outline how traffic flow and pedestrian walkways will be handled during the course of construction and where detour and advance notice signs will be posted.
Traffic control plan shall be approved in writing by the City Engineer prior to construction starts.
The plan shall be prepared per latest edition of California Manual on Traffic Control Devices (CA-MUTCD).
Traffic lane transitions shall not be sharper than a taper of thirty to one.
Temporary striping will not be allowed unless specifically permitted by the Engineer. The Contractor shall prepare any plans that may be required for temporary striping to the satisfaction of the Engineer. In no event will temporary striping be allowed to remain on finish pavement surfaces.
In no case shall traffic be diverted from the existing traveled way without prior approval of the City Engineer.
The contractor shall include in his Traffic Control Plan use of lighted message boards to notify traffic of project and any changes in vehicle or pedestrian travel routes.
If the Contractor shall fail to provide and install any of the signs or traffic control devices ordered by the Engineer, the Engineer may either stop the work or cause such signs or traffic control devices to be placed by others and charge the cost therefor against the Contractor and deduct same from the next progress payment.
601-2.2 Payment
Payment for provisions under section 601 of the Standard Specifications shall be considered included under the bid item for traffic control. No separate payment will be authorized
APPENDIX “A”
STANDARD PLANS
CITY OF MONTEBELLO
MONTEBELLO DOWNTOWN SEWER INFRASTRUCTURE PROJECT
(WHITTIER BLVD FROM MONTEBELLO BLVD TO 1ST ST &
PALM PL FROM SPRUCE ST TO PALM DR)
C.I.P. No. 919
LIST OF STANDARD PLANS
Plan No. Description
Standard Plans for Public Works Construction:
SPPWC 110-2 Driveway Approaches
SPPWC 111-5 Curb Ramp
SPPWC 112-2 Curb and Sidewalk Joints
SPPWC 113-2 Sidewalk and Driveway Replacement
SPPWC 120-3 Curb and Gutter – Barrier
SPPWC 122-3 Cross and Longitudinal Gutters
SPPWC 130-3 Alley Intersection
SPPWC 132-4 Concrete Pavement Replacement
SPPWC 133-4 AC Pavement Replacement
SPPWC 134-3 Concrete Pavement Joint Details
SPPWC 200-4 Precast Concrete Sewer Manhole
SPPWC 205-3 Sewer Manhole Adjustment
SPPWC 206-2 Manhole Raising Rings
SPPWC 210-4 24” Manhole Frame and Cover
SPPWC 222-2 House Connection Sewer
SPPWC 224-3 Support for Conduits Across Trenches
SPPWC 635-3 Steel Step
Los Angeles County Sanitation District:
S-A-204 Standard Manhole, Type “D”
S-A-209 Standard Manhole Step
S-A-218 Standard Abandonment of Existing
Manholes Type “A” or “D”
S-A-220 Standard Pull Ring
CALTRANS:
A20A, A20B, A20D, A20E, A20F, and A20G Pavement Markers and Traffic Lines A24A, A24B, A24C, A24D, A24E, A24F, A24G, A24H Pavement Markings, Arrows, Words,
Symbols, Numerals, Limits &
Crosswalk Lines
A90B Accessible Parking On-Street
ES-5A and ES-5B Electrical Systems (Loop Detectors)
APPENDIX “B”
DEPARTMENT OF INDUSTRIAL RELATIONS (DIR)
CONTRACTOR REGISTRATION NUMBER FORM
Department of Industrial Relations (DIR) Contractor
Registration Number
Beginning July 1, 2014, contractors must register with the Department of Industrial Relations (DIR) before bidding on public works contracts in California. For more information, please refer to this section of the Department of Industrial Relations Website:
http://www.dir.ca.gov/Public-Works/PublicWorks.html.
Per this requirement, provide the following information:
______________________________________________________________________ Contractor Name
Contractor Department of Industrial Relations Registration Number:
______________________________________________________________________ Expiration Date of Registration Number
*(THIS FORM MUST BE SUBMITTED WITH THE SEALED BID) *
APPENDIX “C”
PROJECT SIGN
APPENDIX “D”
PAVEMENT PROFILING REPORT
(PAVEMENT CORES)
17800 Newhope Street, Suite B, Fountain Valley, California 92708 Tel: (714) 751-3826 Fax: (714) 751-3928 September 24, 2024
EMI Project No. 23-102-03
Mark Thomas & Company, Inc.
2121 Alton Parkway, Suite 210
Irvine, CA 92606
Attention: Mr. Pat Somerville, P.E.
Subject: Geotechnical Memorandum
Montebello Sewer Program
Montebello, California
Dear Mr. Somerville:
This memorandum presents the findings and conclusions of a geotechnical study conducted by Earth Mechanics, Inc. (EMI) in City of Montebello as part of the Montebello Sewer Program.
The purpose of this geotechnical study was to evaluate the existing site conditions, obtain information on subsurface soils, and develop design and construction recommendations for the proposed improvements to assist Mark Thomas & Company, Inc. (MTC) in preparing the Plans, Specifications, and Estimates (PS&E) for the project.
1.0 Introduction
The City of Montebello proposes to replace multiple sewer lines along the following streets.
Northerly and southerly alleys are located just north and south sides of the W Whittier Boulevard between S Montebello Boulevard and Rio Hondo Channel:
• Palm Place from N Spruce St to a distance of about 330 feet • Northerly Alley between N Montebello Boulevard and N Poplar Avenue for a distance of about 2,600 feet. This alley includes laterals along N Montebello Boulevard, N 6th Street and N 5th Street towards W Whittier Boulevard
• Southerly Alley between S Montebello Boulevard and S Bluff Road for a distance of about 2,300 feet. This alley includes laterals along S Montebello Boulevard, S 7th Street, S 6th Street and S 5th Street towards W Whittier Boulevard
It is our understanding that, after the completion of the installation of sewer lines and backfilling the trench, the existing roadway will be reconstructed with new pavements. The project location is shown in Figure 1.
2.0 Climatic Conditions
The climate of the project region is Mediterranean. The hottest months are July through September with average high temperatures in the high 80’s (°F) and average low temperatures in the mid 60’s (°F). The coolest temperatures occur in the winter months of November through March with
2 the average high temperatures in the high 60’s to mid 70’s (°F) and average low temperatures in the high 40’s to low 50’s (°F).
Annual average precipitation is about 14.8 inches with most of the rain falling in January. Snowfall is not anticipated in the area. Based on the above information, freeze-thaw recommendations are not expected to be required.
Per Caltrans Highway Design Manual (Caltrans, 2023a), the project site is located in the “South Coast” climate region.
3.0 Geotechnical Investigation
A geotechnical field investigation was conducted along the proposed sewer replacement by EMI on September 3, 2024. The field investigation included three hollow-stem auger borings and two hand auger borings. Soil exploration information is summarized in Table 1. The coordinates and elevations were obtained using handheld GPS device. All the boring logs are included in Appendix A. The approximate locations of the borings are shown in Figure 2.
Table 1. Soil Exploration Information
Boring
No.
Boring
Type
Approx.
Latitude
Approx.
Longitude
Approx.
Ground Surface
El. (feet)
Approx.
Bottom of
Hole El. (feet)
Approx. Groundwater
El. During Drilling
(feet)
B-1 HSA 34.0127 -118.1086 +195.2 +179.7 NE
B-2 HSA 34.0102 -118.1062 +198.1 +182.6 NE
B-3 HA 34.0091 -118.1013 +212.5 +202.5 NE
B-4 HSA 34.0094 -118.1061 +202.0 +186.6 NE
B-5 HA 34.0083 -118.1023 +209.6 +199.6 NE
Notes: HSA = Hollow-Stem Auger, HA = Hand Auger; NE = Not Encountered.
The hollow-stem auger borings were drilled using track-mounted drill rig (CME 75) equipped with 8-inch diameter hollow-stem augers. The hand auger borings were drilled using a 3-inch diameter stainless steel hand auger. Subsurface soils and conditions were logged, and samples of soils were collected for laboratory testing. Smaller disturbed and relatively undisturbed soil samples were collected from borings generally at 2.5-foot intervals using the Modified California Drive (MCD) sampler. The MCD sampler is lined with a series of 1-inch tall brass rings with an inside diameter of 2.4 inches. Bulk samples were also collected from the borings.
4.0 Soil Laboratory Testing and Results
Soil samples, considered representative of the subsurface conditions, were tested to obtain or derive relevant physical and engineering properties. The type of laboratory tests include: moisture content, dry density, percentage passing the No. 200 sieve, Atterberg Limits, direct shear, UU triaxial, compaction, and R-value. The laboratory soil tests were conducted in general accordance with California Test (CT) methods or American Society for Testing and Materials (ASTM) standards. The laboratory test results of the near surface soils samples are provided in Appendix B.
3 5.0 Existing Site Conditions
The proposed sewer replacement is located along the existing paved roadways and rear alleys. The Montebello Sewer Program alignment crosses several streets. Existing roadways are primarily residential streets with one lane in each direction. Rear alleys are paved alleyways with concrete gutters in the middle. Multiple underground and overhead utilities are located along the project alignments.
6.0 Subsurface Conditions
Subsurface information obtained from the EMI field exploration indicates that the project area is underlain by alternating layers of coarse-grained soils consisting of dense to very dense silty sand, clayey sand, sandy silt, and sand and fine-grained soils consisting of stiff to hard clay and silty clay. Variable amounts of gravel were also encountered in a few of the borings at various depths.
The above soil description is general and is intended to describe the subsurface in very broad terms.
The soil description above should not be construed to mean that the subsurface profile is uniform, and that soil is homogeneous along the project alignments. Details on the stratigraphy at each exploratory location are shown on the borehole logs provided in Appendix A.
7.0 Groundwater
During the field investigation performed by EMI along the project alignments, groundwater was not encountered in any of the borings advanced to maximum depth of 15.5 feet below existing ground surface.
The California Department of Water Resources Data Library was reviewed for additional groundwater level readings in the vicinity of the project site. One well is located at a distance of 5,000 feet west of the project site. The well shows a highest groundwater elevation of about +102 feet; the ground surface of this well is about +193 feet.
It should be noted that the groundwater elevation can fluctuate due to variations in seasonal rainfall, runoff volume, nearby irrigation, changes in or addition of flood control improvements, groundwater extraction and recharge of local and regional aquifers, construction activities, and other manmade or natural conditions. Therefore, the groundwater elevation during construction may be different from those measured in the past and recent borings.
8.0 Corrosion Testing
Representative soil samples collected from throughout the project area were tested to determine corrosivity including minimum resistivity, pH, soluble sulfate content, and soluble chloride content. Four soil samples were tested for corrosivity, and the results are summarized in Table 2.
4 Table 2. Soil Corrosion Test Results
Boring No.
Sample
Depth
(feet)
Sample Elevation
(feet)
Groundwater
El. During
Drilling (feet)
USCS Soil Type
Minimum
Resistivity
(ohm-cm)
pH
Chloride
Content
(ppm)
Sulfate
Content
(ppm)
B-1 0 +195.2 NE Lean Clay with Sand (CL) 3,800 7.7 153 285 B-2 0 +198.1 NE Sandy Lean Clay (CL) 4,000 8.2 105 106
B-4 5 +197.0 NE Lean Clay with Sand (CL) 2,900 8.3 196 741 B-5 0 +209.6 NE Sandy Silty Clay (CL-ML) 7,800 7.6 153 311 Note: NE = Not Encountered.
According to the Caltrans Corrosion Guidelines V3.2 (Caltrans, 2021), soils are considered corrosive if the pH is 5.5 or less, chloride concentration is 500 parts per million (ppm) or greater, or sulfate concentration is 1,500 ppm or greater. Based on Caltrans criteria, on-site soils are considered non-corrosive to concrete or metal.
We understand that the values may be used to estimate potential corrosive characteristics of the on-site soils with respect to contact with the various underground materials which will be used for project construction. We recommend that corrosive potential of the on-site soils to underground ferrous metals should be evaluated by a corrosion engineer.
9.0 Trenching and Shoring
Based on OSHA excavation safety guideline, any excavation deeper than 4 feet should be sloped or shored. Due to the limited space along the roadway, we anticipate that shored temporary excavation with vertical sidewalls will be required for the project. The anticipated shoring system might be cantilevered shoring or braced shoring. For cantilevered shoring retaining level ground, a lateral active earth pressure of 42H psf (H is the total height of excavation) is recommended. For the design of braced shoring, total lateral earth pressure of 36H pounds per foot (H is the total height of excavation) is recommended. The total lateral earth pressure should be considered at the mid height of the shoring. The lateral earth pressures provided above do not include surcharge pressures. Therefore, if applicable, lateral pressures due to surcharges from vehicle traffic or adjacent structures should be added to the above lateral earth pressures.
Design of temporary shoring is the contractor’s responsibility during construction. Heavy construction equipment should not be used immediately adjacent to shoring due to large lateral pressures induced by such equipment unless the shoring is designed to accommodate resulting pressures. Excavated soil or construction materials should not be stockpiled adjacent to shoring or open excavations. Stockpiled soil and construction materials should be set back a distance at least equal to the height of the excavation. It should be noted that it is the responsibility of the contractor to oversee the safety of the workers in the field during construction. The contractor shall conform to all applicable occupational safety and health standards, rules, regulations, and orders established by the State of California. The geotechnical consultant should review the trench shoring design and safety plan to confirm that recommendations presented in this memorandum have been applied to the design.
5 Qualified geotechnical personnel should inspect temporary slopes for erosion and sloughing, and should inspect temporary shoring for signs of instability and deformations, during construction on a daily basis.
The contractor is responsible for evaluating the ease/difficulty of installing and extracting structural elements for temporary shoring walls in contact with the ground.
10.0 Trench Bottom Preparation and Backfill
Backfill and excavation should follow Caltrans Standard Plan Sheet A62D for concrete pipes.
Typically, backfill materials placed on the sides and underneath the pipe should be either granular soils with a Sand Equivalent (SE) of at least 30 or Structure Backfill. On-site materials may be used as backfill above the top of the pipe. We recommend the materials specifications and minimum relative compaction presented in Table 3.
Table 3. Summary of Trench Backfill Materials Specifications Caltrans Standard Plan
Sheet A62D Designation Materials Specifications Min. Relative Compaction Structure Backfill Caltrans Structure Backfill with a minimum Sand Equivalent (SE) of 30 95%
Roadway Embankment Same as above or Onsite Soils 90%
Any loose materials, overside particles larger than 2 inches and/or unsuitable materials encountered at the bottom of the excavation should be removed and replaced with adequate bedding materials. The storm drain pipe subgrade should be level, uniform, firm and free of loose materials. The subgrade should be properly graded to provide uniform bearing and support to the entire section of the storm drain pipe. If pumping or yielding of the subgrade is observed during construction, appropriate measures should be taken by the contractor to stabilize the subgrade.
11.0 R-Values
Two soil samples, collected from the upper five feet of the existing subgrade, were tested to determine their R-value, percent passing No. 200 Sieve, and Plasticity Index. The test results along with the USCS soil type are presented in Table 4.
Table 4. Subgrade Soil Type, R-Value, and No. 200 Wash
Boring
No.
Sample
No.
Sample
Depth
(feet)
USCS Soil Type R-Value
No. 200
Wash
(%)
PI
B-1 B-0 0-5 Lean Clay with Sand (CL) 5 75 -
B-4 B-0 0-5 Sandy Lean Clay (CL) 4 66 12
Based on the above, EMI recommends using a design R-value of 4 for flexible pavement design.
The project site is located in the “South Coast” climate region.
6 12.0 Pavement Structural Sections
Based on the information provided by the client, the existing roadway within the project alignments may be reconstructed with new asphalt concrete (flexible pavements) pavements. The flexible pavements were designed using the web-based program developed by Caltrans and the methodology given in Chapter 630 of Caltrans Highway Design Manual (2023a).
As shown in the table below, a 20-year design life Traffic Index (TI) values of 6 to 9 are considered.
Based on the laboratory test results, a design R-value of 4 is recommended.
The recommended flexible pavement sections are presented in Table 5.
Table 5. Recommended Flexible Pavement Structural Sections Location Design Life
(Years)
Design
R-Value TI Recommended Pavement Sections
Palm Place, North
6th Street, South 6th
Street, North 5th
Street, South 5th
Street
20 4
6.0 0.35’ HMA-A / 0.65’ AB
7.0 0.40’ HMA-A / 0.70’ AB
8.0 0.45’ HMA-A / 0.85’ AB
9.0 0.55’ HMA-A / 1.00’ AB
Note: HMA-A = Hot Mix Asphalt (Type A); AB = Aggregate Base (Class 2)
13.0 Pavement Subgrade
A design R-value of 4 is recommended for the flexible pavement design. If the R-value of subgrade exposed during construction comes into question, the exposed soils should be sampled and tested during grading to verify the R-value. In locations where structural pavement sections will be constructed atop import fill (Select) materials, the Select Materials placed within four feet of the grading plane should have a minimum R-Value of 4 and a Plasticity Index of less than or equal to 12%.
Prior to placing the pavements, the exposed subgrade should be scarified to minimum depth of 10 inches, moisture conditioned and compacted to at least 90% relative compaction based on the maximum densities determined by ASTM D1557 or CT 216. Special care is required when compacting soils near buried utility lines, drainage devices, and other sensitive buried structures, to avoid damaging the existing facilities.
14.0 Pavement Materials and Construction
HMA should conform to requirements of Section 39 of the Caltrans Standard Specifications and Special Provisions. The asphalt specifications should include ¾-inch or 1-inch aggregate gradation with PG 64-10 binder for HMA-A thickness of 0.25-feet or greater.
For HMA dikes and miscellaneous areas, use 3/8-inch or 1/2-inch aggregate gradation and PG 64-10 asphalt binder. Recommended aggregate gradations for HMA miscellaneous areas and
7 HMA dikes are currently found in Section 39 of the Caltrans Standard Specifications (2023b) and Standard Special Provisions (2022).
For flexible pavement sections, prime coat shall be applied to the aggregate base material per Section 39-2.01C(3)(c) of Caltrans Standard Special Provisions (2022) prior to placing Hot Mix Asphalt. Tack coat shall be applied between successive layers of HMA as required by the specifications.
15.0 Limitations
This memorandum is intended for use by Mark Thomas & Company, Inc. (MTC) and the City of Montebello for the replacement of three sewer lines within the Montebello Sewer Program. This memorandum is based on the project as described herein and the information obtained from the exploratory boreholes at the approximate locations shown on the enclosed plan. Findings and recommendations contained herein are based on the results of the field investigation, laboratory soil tests, and geotechnical engineering analyses. In addition, soils and subsurface conditions encountered in the exploratory boreholes are presumed to be representative of the project area.
However, subsurface conditions and soils characteristics between exploratory boreholes can vary.
The findings reflect an interpretation of the direct evidence obtained. The recommendations presented in this memorandum are based on the assumption that an appropriate level of quality control and quality assurance (inspections and tests) will be provided during construction. EMI should be notified of any pertinent changes in the project plans or if subsurface conditions are found to vary from those described herein. Such changes or variations may require a re-evaluation of recommendations contained in this memorandum.
The data, opinions, and recommendations contained in this memorandum are applicable to the specific design elements and locations which are the subject of this memorandum. The data, opinions, and recommendations have no applicability to any other design elements or to any other locations. Any and all subsequent users accept any and all liability resulting from any use or reuse of the data, opinions, and recommendations without the prior written consent of EMI.
EMI has no responsibility for construction means, methods, techniques, sequences, procedures, or safety programs in connection with the construction, for the acts or omissions of the Contractor, or any other person performing any of the design or construction, or for the failure of any worker to carry out the construction in accordance with the Final Construction Drawings and Specifications.
Services performed by EMI have been conducted in a manner consistent with that level of care and skill ordinarily exercised by members of the profession currently practicing in the same locality under similar conditions. No other representation, expressed or implied, and no warranty or guarantee are included or intended.
8 16.0 References
American Society for Testing and Materials (ASTM), 2017, Annual Book of Standards. Soil and Rock; Vol. 04.08
California Department of Transportation (Caltrans), California Test Methods, various dates. ——, 2023a, Highway Design Manual, 7
th Edition, September.
——, 2023b, Standard Specifications
——, 2023c, CalME-Web, Caltrans Mechanistic-Empirical Structural Analysis Program for Flexible Pavements, http://www.ucprc.ucdavis.edu/calme/. ——, 2022, Standard Special Provisions
——, 2021, Corrosion Guidelines, Version 3.2: Division of Engineering Services, Materials Engineering and Testing Services, Corrosion Branch, May.
We appreciate the opportunity to provide geotechnical services for this project. If you have any questions, please do not hesitate to contact us.
Sincerely,
EARTH MECHANICS, INC.
Taylor Nguyen, EIT
Staff Engineer
S. (Raj) Pirathiviraj, GE 2963
Senior Engineer
(Alahesh) A. Thurairajah, GE 3123
Project Manager
EXP. 9-30-2025 NO. GE 3123
Project No. Figure 1
Earth Mechanics, Inc.
Geotechnical and Earthquake Engineering
23-102-03
Montebello Sewer Program SITE LOCATION MAP
Date: September 2024
PROJECT LOCATION
Earth Mechanics, Inc.
Geotechnical and Earthquake Engineering
W Whittier Blvd
B-1 N Montebello Blvd B-1 15.5 ft
B-1 Location of Geotechnical Boring
"B" - Hollow Stem Auger Boring or Hand Auger Boring
Depth (ft)
SCALE
0 300 600 FEET
Montebello Sewer Program
Project No. 23-102-03 Date: September 2024
B-2
15.5 ft
B-4
15.4 ft
B-5
10 ft
B-3
10 ft
Palm Pl
W Cleveland Ave
N Spruce St
W Whittier Blvd
N 6th St N 5th St N 4th St
N 3rd St N 2nd St N 1st St
W Cleveland Ave
S 6th St S 5th St S 4th St S 3rd St S 2nd St N Montebello Blvd S 7th St W Los Angeles Ave S Spruce St N 10th St
W Madison Ave
N 5th St
N 4th St
W Los Angeles Ave
S 7th St
S Bluff Rd
N Poplar Ave
N 6th St
N 3rd St N 2nd St W Fremont Sq
Poplar Way
Palm Sewer
Northerly Alley Sewer
Southerly Alley Sewer
Southerly Alley Sewer
APPENDIX A
BORING LOGS
Montebello Sewer Program
Project Number: 23-102-03
GROUP SYMBOLS AND NAMES
GW-GM
GC
SW-SM
SM
PT
Well-graded GRAVEL with SILT
PEAT
COBBLES
COBBLES and BOULDERS
BOULDERS
CL-ML
ORGANIC SOIL
ORGANIC SOIL with SAND
ORGANIC SOIL with GRAVEL
SANDY ORGANIC SOIL
SANDY ORGANIC SOIL with GRAVEL
GRAVELLY ORGANIC SOIL
GRAVELLY ORGANIC SOIL with SAND
ORGANIC elastic SILT
GRAVELLY ORGANIC elastic SILT
GRAVELLY ORGANIC elastic SILT with SAND
ORGANIC fat CLAY
Poorly graded GRAVEL with CLAY and SAND
(or SILTY CLAY and SAND)
Well-graded SAND with GRAVEL
BORING RECORD LEGEND
Date: 9-5-24
SHEET
1 of 2
WA
SAMPLER GRAPHIC SYMBOLS
FIELD AND LABORATORY TESTS
CP
CR
CU
DS
EI
M
OC
P
PA
PI
PL
PM
PP
R
VS
Collapse Potential (ASTM D 5333)
Corrosion, Sulfates, Chlorides (CTM 643; CTM 417;
CTM 422)
Consolidated Undrained Triaxial (ASTM D 4767)
Direct Shear (ASTM D 3080)
Moisture Content (ASTM D 2216)
Organic Content (ASTM D 2974)
Permeability (CTM 220)
Particle Size Analysis (ASTM D 422)
Liquid Limit, Plastic Limit, Plasticity Index
(AASHTO T 89, AASHTO T 90)
Vane Shear (AASHTO T 223)
DRILLING METHOD SYMBOLS WATER LEVEL SYMBOLS
Auger Drilling Rotary Drilling Dynamic Cone
or Hand Driven Diamond Core
First Water Level Reading (during drilling)
Static Water Level Reading (short-term)
Static Water Level Reading (long-term)
Standard Penetration Test (SPT)
Standard California Sampler
Modified California Sampler
NX Rock Core
Shelby Tube
Bulk Sample
C
Unconfined Compression - Soil (ASTM D 2166)
Unconfined Compression - Rock (ASTM D 2938)
Unit Weight (ASTM D 4767)
Wash Analysis (ASTM D 1140)
Piston Sampler
HQ Rock Core
Other (see remarks)
Graphic / Symbol Group Names Graphic / Symbol Group Names GW
GP
CL
Well-graded GRAVEL
Poorly graded GRAVEL
Well-graded GRAVEL with SAND
Poorly graded GRAVEL with SAND
Lean CLAY
Lean CLAY with SAND
Lean CLAY with GRAVEL
SANDY lean CLAY
SANDY lean CLAY with GRAVEL
GRAVELLY lean CLAY
GRAVELLY lean CLAY with SAND
GW-GC
GP-GM
GP-GC
Well-graded GRAVEL with SILT and SAND
Well-graded GRAVEL with CLAY (or SILTY
CLAY)
Well-graded GRAVEL with CLAY and SAND
(or SILTY CLAY and SAND)
Poorly graded GRAVEL with SILT
Poorly graded GRAVEL with SILT and SAND
Poorly graded GRAVEL with CLAY
(or SILTY CLAY)
ML
OL
SILT with GRAVEL
SANDY SILT
SANDY SILT with GRAVEL
GRAVELLY SILT
SILTY CLAY with SAND
SILTY CLAY with GRAVEL
SANDY SILTY CLAY
SANDY SILTY CLAY with GRAVEL
GRAVELLY SILTY CLAY
GRAVELLY SILTY CLAY with SAND
GM
GC-GM
SW
SILTY GRAVEL
SILTY GRAVEL with SAND
CLAYEY GRAVEL
CLAYEY GRAVEL with SAND
SILTY, CLAYEY GRAVEL
SILTY, CLAYEY GRAVEL with SAND
Well-graded SAND
OL
CH
GRAVELLY SILT with SAND
ORGANIC lean CLAY
ORGANIC lean CLAY with SAND
ORGANIC lean CLAY with GRAVEL
SANDY ORGANIC lean CLAY
SANDY ORGANIC lean CLAY with GRAVEL
GRAVELLY ORGANIC lean CLAY
GRAVELLY ORGANIC lean CLAY with SAND
ORGANIC SILT
ORGANIC SILT with SAND
ORGANIC SILT with GRAVEL
SANDY ORGANIC SILT
SANDY ORGANIC SILT with GRAVEL
GRAVELLY ORGANIC SILT
SP
SW-SC
SP-SM
SP-SC
SC
SC-SM
Poorly graded SAND
Poorly graded SAND with GRAVEL
Well-graded SAND with SILT
Well-graded SAND with SILT and GRAVEL
Well-graded SAND with CLAY (or SILTY CLAY)
Well-graded SAND with CLAY and GRAVEL
(or SILTY CLAY and GRAVEL)
Poorly graded SAND with SILT
Poorly graded SAND with SILT and GRAVEL
Poorly graded SAND with CLAY (or SILTY CLAY)
Poorly graded SAND with CLAY and GRAVEL
(or SILTY CLAY and GRAVEL)
SILTY SAND
SILTY SAND with GRAVEL
CLAYEY SAND
CLAYEY SAND with GRAVEL
SILTY, CLAYEY SAND
SILTY, CLAYEY SAND with GRAVEL
MH
OH
OH
OL/OH
ORGANIC elastic SILT with SAND
ORGANIC elastic SILT with GRAVEL
SANDY ORGANIC elastic SILT with GRAVEL
ORGANIC fat CLAY with SAND
ORGANIC fat CLAY with GRAVEL
SANDY ORGANIC fat CLAY
SANDY ORGANIC fat CLAY with GRAVEL
GRAVELLY ORGANIC fat CLAY
GRAVELLY ORGANIC fat CLAY with SAND
Elastic SILT
Elastic SILT with SAND
Elastic SILT with GRAVEL
SANDY elastic SILT
SANDY elastic SILT with GRAVEL
GRAVELLY elastic SILT
GRAVELLY elastic SILT with SAND
Fat CLAY
SILTY CLAY
Fat CLAY with SAND
Fat CLAY with GRAVEL
SANDY fat CLAY
SANDY fat CLAY with GRAVEL
GRAVELLY fat CLAY
GRAVELLY fat CLAY with SAND
SILT
SILT with SAND
GRAVELLY ORGANIC SILT with SAND
SANDY ORGANIC elastic SILT
Pocket Torvane
Earth Mechanics, Inc.
Geotechnical and Earthquake Engineering
Pressure Meter
Pocket Penetrometer
CL
SE
SG
SL
Compaction Curve (CTM 216)
Point Load Index (ASTM D 5731)
R-Value (CTM 301)
Sand Equivalent (CTM 217)
Specific Gravity (AASHTO T 100)
Shrinkage Limit (ASTM D 427)
Swell Potential (ASTM D 4546)
Unconsolidated Undrained Triaxial
(ASTM D 2850)
SW
TV
UC
UU
UW
Consolidation (ASTM D 2435)
Expansion Index (ASTM D 4829)
Project Number: 23-102-03
APPARENT DENSITY OF COHESIONLESS SOILS
CONSISTENCY OF COHESIVE SOILS
MOISTURE
PERCENT OR PROPORTION OF SOILS SOIL PARTICLE SIZE
PLASTICITY OF FINE-GRAINED SOILS
CEMENTATION
Descriptor Unconfined Compressive
Strength (tsf)
Pocket
Penetrometer (tsf) Torvane (tsf) Field Approximation
Very Soft < 0.25 < 0.12 Easily penetrated several inches by fist Medium Stiff
Stiff
Very Stiff
> 4.0
0.25 - 0.50
0.50 - 1.0 0.25 - 0.50
0.50 - 1.0
1.0 - 2.0
Readily indented by thumb but penetrated
only with great effort
2.0 - 4.0 Readily indented by thumbnail
1.0 - 2.0
2.0 - 4.0
Soft
Hard
0.25 - 0.50
0.50 - 1.0
< 0.25
> 4.0
0.12 - 0.25
> 2.0
Easily penetrated several inches by thumb
Can be penetrated several inches by thumb
with moderate effort
Indented by thumbnail with difficulty
Descriptor SPT N60 - Value (blows / foot)
Very Loose 0 - 4
Loose
Medium Dense
Dense
Very Dense
5 - 10
11 - 30
31 - 50
> 50
Descriptor
Descriptor Descriptor
Descriptor
Descriptor
Criteria
Criteria
Criteria
Criteria
Dry Absence of moisture, dusty, dry to the touch
Wet
Damp but no visible water
Visible free water, usually soil is below
water table
Moist
Trace Particles are present but estimated
to be less than 5%
Few
Little
Some
Mostly
5 to 10%
15 to 25%
30 to 45%
50 to 100%
Boulder
Cobble
Gravel
Sand
Silt and Clay
Coarse
Fine
Coarse
Medium
Fine
Earth Mechanics, Inc.
Geotechnical and Earthquake Engineering
Size
> 12 inches
No. 10 Sieve to No. 4 Sieve
3 to 12 inches
3/4 inch to 3 inches
No. 4 Sieve to 3/4 inch
No. 40 Sieve to No. 10 Sieve
No. 200 Sieve to No. 40 Sieve
Passing No. 200 Sieve
Nonplastic A 1/8-inch thread cannot be rolled at any water content.
Low
BORING RECORD LEGEND
Medium
High
The thread can barely be rolled, and the lump cannot be formed when drier than the plastic limit.
The thread is easy to roll, and not much time is required to reach the plastic limit; it cannot be rerolled after reaching the plastic limit. The lump crumbles when drier than the plastic limit.
It takes considerable time rolling and kneading to reach the plastic limit. The thread can be rerolled several times after reaching the plastic limit. The lump can be formed without crumbling when drier than the plastic limit.
Weak Crumbles or breaks with handling or
little finger pressure.
Moderate
Strong
Crumbles or breaks with considerable
finger pressure.
Will not crumble or break with finger
pressure.
SHEET
2 of 2
1.0 - 2.0
Date: 9-5-24
NOTE:
This legend sheet provides descriptors and associated criteria for required soil description components only. Refer to Caltrans Soil and Rock Logging, Classification, and
Presentation Manual (2010 Edition), Section 2, for tables of additional soil description components and discussion of soil description and identification.
REF = Refusal; During drilling seating interval (first 6-inch interval) is not achieved.
Montebello Sewer Program
ASPHALT Asphalt Concrete (1.5''); Aggregate Base
(1.0'').
Lean CLAY with SAND (CL); reddish brown; moist; 25%
fine to coarse SAND; 75% medium plasticity fines.
SILTY CLAY (CL-ML); hard; brown; moist; few fine SAND;
mostly fines; PP>4.5 tsf.
SILT with SAND (ML); hard; olive brown; moist; 24% fine SAND; 76% low plasticity fines; PP>4.5 tsf.
Poorly-graded SAND with SILT (SP-SM); very dense;
light brown; moist; 95% fine to medium SAND; 5%
nonplastic fines.
SILT with SAND (ML); hard; olive brown; moist; little fine SAND; mostly low plasticity fines; PP>4.5 tsf.
Lean CLAY (CL); hard; brown; 8% fine SAND; 92%
medium plasticity fines; PP>4.5 tsf.
Bottom of borehole at 15.5 ft bgs
CP, CR, R, W
PI, W
W
W
W
12 14
29 2
30 27
119
91 98
93 95
100
92 100
100
100
100
16 46
50/4.5"
14 19
31 16
25 29
5 17
29 16
26 32
0 1
2 3
4 5
50 54
46 58
HAMMER EFFICIENCY, ERi
81%
TOTAL DEPTH OF BORING
15.5 ft
LOGGED BY
KK
BEGIN DATE
9-3-24
HOLE ID
B-1
COMPLETION DATE
9-3-24
DRILLING CONTRACTOR
2R Drilling
BOREHOLE DIAMETER
8 in
BOREHOLE LOCATION (Offset, Station, Line)
Palm PIace
.
SURFACE ELEVATION
195.2 ft
DRILLING METHOD
Hollow-Stem Auger
DRILL RIG
CME 75
SAMPLER TYPE(S) AND SIZE(S) (ID)
Bulk, Mod Cal (2.4")
SPT HAMMER TYPE
140 lbs automatic hammer drops 30-inch
BOREHOLE BACKFILL AND COMPLETION
Soil Cuttings and Capped with Cold Patch Asphalt
GROUNDWATER
READINGS
DURING DRILLING AFTER DRILLING (DATE)
NE
BOREHOLE LOCATION (Lat/Long or North/East and Datum)
34.0127 -118.1086
HOLE ID
B-1
DATE
9-5-24
SHEET
1 of 1
Earth Mechanics, Inc.
Geotechnical and Earthquake Engineering
DESCRIPTION
MaterialGraphicsDrilling MethodCasing Depth
Remarks
Sample NumberBlows per 6 in.Recovery (%)MoistureContent (%)Dry Unit Weight(pcf)Shear Strength(tsf)
REPORT TITLE
BORING RECORD
ELEVATION (ft)
193.20
191.20
189.20
187.20
185.20
183.20
181.20
179.20
177.20
175.20
173.20
171.20
Sample LocationBlows per footGas Data
PROJECT OR BRIDGE NAME
Montebello Sewer Program
BRIDGE NUMBER
DEPTH (ft)
PREPARED BY
FO
CALTRANS BORING RECORD MET+ENG FIXED MONTEBELLO ON-CALL.GPJ EMI CALTRANS 2013 V2.0.GLB 9/19/24 0 1
2 3
4 5
6 7
8 9
10 11
12 13
14 15
16 17
18 19
20 21
22 23
24 25
ASPHALT Asphalt Concrete (3'').
SANDY lean CLAY (CL); reddish brown; moist; 4% fine
GRAVEL, max. 3/4 in. dia.; 35% fine to coarse SAND;
61% medium plasticity fines.
Lean CLAY with SAND (CL); hard; reddish brown; moist;
19% fine SAND; 81% fines; PP>4.5 tsf.
SILTY, CLAYEY SAND (SC-SM); very dense; brown;
moist; mostly fine to medium SAND; some low plasticity
fines.
Lean CLAY with SAND (CL); hard; brown; moist; 19% fine
SAND; 81% medium plasticity fines; PP=4.5 tsf.
SILTY CLAY (CL-ML); hard; brown; moist; few fine to
coarse SAND; mostly fines; PP=4.5 tsf.
SANDY lean CLAY (CL); hard; brown; moist; 32% fine
SAND; 68% medium plasticity fines; PP>4.5 tsf.
Bottom of borehole at 15.5 ft bgs
CR, W
PI, UU, W
DS
W
PI
W
14 14
26 19
16 19
120
107
111
119
104
100
100
100
100
97 100
2 8
17 10
18 19
10 16
27 22
38 50/5.5"
17 22
26 0
1 2
3 4
5 25
37 43
48 HAMMER EFFICIENCY, ERi
81%
TOTAL DEPTH OF BORING
15.5 ft
LOGGED BY
KK
BEGIN DATE
9-3-24
HOLE ID
B-2
COMPLETION DATE
9-3-24
DRILLING CONTRACTOR
2R Drilling
BOREHOLE DIAMETER
8 in
BOREHOLE LOCATION (Offset, Station, Line)
Adjacent to North 6th Street
.
SURFACE ELEVATION
198.1 ft
DRILLING METHOD
Hollow-Stem Auger
DRILL RIG
CME 75
SAMPLER TYPE(S) AND SIZE(S) (ID)
Bulk, Mod Cal (2.4")
SPT HAMMER TYPE
140 lbs automatic hammer drops 30-inch
BOREHOLE BACKFILL AND COMPLETION
Soil Cuttings and Capped with Cold Patch Asphalt
GROUNDWATER
READINGS
DURING DRILLING AFTER DRILLING (DATE)
NE
BOREHOLE LOCATION (Lat/Long or North/East and Datum)
34.0102 -118.1062
HOLE ID
B-2
DATE
9-5-24
SHEET
1 of 1
Earth Mechanics, Inc.
Geotechnical and Earthquake Engineering
DESCRIPTION
MaterialGraphicsDrilling MethodCasing Depth
Remarks
Sample NumberBlows per 6 in.Recovery (%)MoistureContent (%)Dry Unit Weight(pcf)Shear Strength(tsf)
REPORT TITLE
BORING RECORD
ELEVATION (ft)
196.10
194.10
192.10
190.10
188.10
186.10
184.10
182.10
180.10
178.10
176.10
174.10
Sample LocationBlows per footGas Data
PROJECT OR BRIDGE NAME
Montebello Sewer Program
BRIDGE NUMBER
DEPTH (ft)
PREPARED BY
FO
CALTRANS BORING RECORD MET+ENG FIXED MONTEBELLO ON-CALL.GPJ EMI CALTRANS 2013 V2.0.GLB 9/19/24 0 1
2 3
4 5
6 7
8 9
10 11
12 13
14 15
16 17
18 19
20 21
22 23
24 25
ASPHALT Asphalt Concrete (3''); Aggregate Base (7'').
Lean CLAY with SAND (CL); reddish brown; moist; little
fine to coarse SAND; mostly fines.
CLAYEY SAND (SC); reddish brown; moist; 3% fine
GRAVEL, max. 1/2 in. dia.; 49% fine to coarse SAND;
48% low plasticity fines.
Bottom of borehole at 10.0 ft bgs
CP, PI
W
11 11
100
100
0 1
HAMMER EFFICIENCY, ERi
N/A
TOTAL DEPTH OF BORING
10.0 ft
LOGGED BY
KK
BEGIN DATE
9-3-24
HOLE ID
B-3
COMPLETION DATE
9-3-24
DRILLING CONTRACTOR
2R Drilling
BOREHOLE DIAMETER
4 in
BOREHOLE LOCATION (Offset, Station, Line)
.
SURFACE ELEVATION
DRILLING METHOD
Hand Auger
DRILL RIG
Hand Auger
SAMPLER TYPE(S) AND SIZE(S) (ID)
Bulk
SPT HAMMER TYPE
N/A
BOREHOLE BACKFILL AND COMPLETION
Soil Cuttings and Capped with Cold Patch Asphalt
GROUNDWATER
READINGS
DURING DRILLING AFTER DRILLING (DATE)
NE
BOREHOLE LOCATION (Lat/Long or North/East and Datum)
34.0091 -118.1013
HOLE ID
B-3
DATE
9-5-24
SHEET
1 of 1
Earth Mechanics, Inc.
Geotechnical and Earthquake Engineering
DESCRIPTION
MaterialGraphicsDrilling MethodCasing Depth
Remarks
Sample NumberBlows per 6 in.Recovery (%)MoistureContent (%)Dry Unit Weight(pcf)Shear Strength(tsf)
REPORT TITLE
BORING RECORD
ELEVATION (ft)
210.50
208.50
206.50
204.50
202.50
200.50
198.50
196.50
194.50
192.50
190.50
188.50
Sample LocationBlows per footGas Data
PROJECT OR BRIDGE NAME
Montebello Sewer Program
BRIDGE NUMBER
DEPTH (ft)
PREPARED BY
FO
CALTRANS BORING RECORD MET+ENG FIXED MONTEBELLO ON-CALL.GPJ EMI CALTRANS 2013 V2.0.GLB 9/19/24 0 1
2 3
4 5
6 7
8 9
10 11
12 13
14 15
16 17
18 19
20 21
22 23
24 25
Between North First Street and North Second Street 212.5 ft
ASPHALT Asphalt Concrete (3.5'').
SANDY lean CLAY (CL); reddish brown; moist; 2% fine
GRAVEL, max. 1/2 in. dia.; 32% fine to coarse SAND;
66% fines.
Lean CLAY with SAND (CL); stiff; reddish brown; moist;
1% fine GRAVEL, max. 1/5 in. dia.; 28% fine to medium
SAND; 71% medium plasticity fines; PP=0.75 tsf.
SILTY SAND (SM); very dense; brown; moist; mostly fine
to medium SAND; little nonplastic fines.
SANDY SILT (ML); dense; brown; 33% fine to medium
SAND; 67% nonplastic fines.
Poorly-graded SAND with GRAVEL (SP); very dense;
light brown; moist; little fine to coarse GRAVEL, max. 3/4 in. dia.; mostly fine to coarse SAND; trace nonplastic
fines.
Poorly-graded SAND (SP); very dense; brown; moist; 1%
fine to coarse GRAVEL, max. 3/4 in. dia.; 96% fine to
coarse SAND; 3% nonplastic fines.
Bottom of borehole at 15.4 ft bgs
PI, R, W
CR, UU, W
DS, W
W
14 16
15 12
2 3
110
112
106
104
104
100
100
100
100
100
100
3 4
5 9
19 26
13 17
26 14
29 27
9 27
50/5"
0 1
2 3
4 5
9 45
43 56
HAMMER EFFICIENCY, ERi
81%
TOTAL DEPTH OF BORING
15.4 ft
LOGGED BY
KK
BEGIN DATE
9-3-24
HOLE ID
B-4
COMPLETION DATE
9-3-24
DRILLING CONTRACTOR
2R Drilling
BOREHOLE DIAMETER
8 in
BOREHOLE LOCATION (Offset, Station, Line)
South 6th Street
.
SURFACE ELEVATION
202.0 ft
DRILLING METHOD
Hollow-Stem Auger
DRILL RIG
CME 75
SAMPLER TYPE(S) AND SIZE(S) (ID)
Bulk, Mod Cal (2.4")
SPT HAMMER TYPE
140 lbs automatic hammer drops 30-inch
BOREHOLE BACKFILL AND COMPLETION
Soil Cuttings and Capped with Cold Patch Asphalt
GROUNDWATER
READINGS
DURING DRILLING AFTER DRILLING (DATE)
NE
BOREHOLE LOCATION (Lat/Long or North/East and Datum)
34.0094 -118.1061
HOLE ID
B-4
DATE
9-5-24
SHEET
1 of 1
Earth Mechanics, Inc.
Geotechnical and Earthquake Engineering
DESCRIPTION
MaterialGraphicsDrilling MethodCasing Depth
Remarks
Sample NumberBlows per 6 in.Recovery (%)MoistureContent (%)Dry Unit Weight(pcf)Shear Strength(tsf)
REPORT TITLE
BORING RECORD
ELEVATION (ft)
200.00
198.00
196.00
194.00
192.00
190.00
188.00
186.00
184.00
182.00
180.00
178.00
Sample LocationBlows per footGas Data
PROJECT OR BRIDGE NAME
Montebello Sewer Program
BRIDGE NUMBER
DEPTH (ft)
PREPARED BY
FO
CALTRANS BORING RECORD MET+ENG FIXED MONTEBELLO ON-CALL.GPJ EMI CALTRANS 2013 V2.0.GLB 9/19/24 0 1
2 3
4 5
6 7
8 9
10 11
12 13
14 15
16 17
18 19
20 21
22 23
24 25
ASPHALT Asphalt Concrete (3.0''); Aggregate Base
(10.5'').
SANDY SILTY CLAY (CL-ML); reddish brown; moist; 2%
fine GRAVEL, max. 1/2 in. dia.; 35% fine to coarse SAND; 63% fines.
3% GRAVEL, max. 1/2 in. dia.; 35% SAND; 62% fines.
Bottom of borehole at 10.0 ft bgs
CR, PI, W
PI, W
12 13
100
100
0 1
HAMMER EFFICIENCY, ERi
N/A
TOTAL DEPTH OF BORING
10.0 ft
LOGGED BY
KK
BEGIN DATE
9-3-24
HOLE ID
B-5
COMPLETION DATE
9-3-24
DRILLING CONTRACTOR
2R Drilling
BOREHOLE DIAMETER
4 in
BOREHOLE LOCATION (Offset, Station, Line)
.
SURFACE ELEVATION
DRILLING METHOD
Hand Auger
DRILL RIG
Hand Auger
SAMPLER TYPE(S) AND SIZE(S) (ID)
Bulk
SPT HAMMER TYPE
N/A
BOREHOLE BACKFILL AND COMPLETION
Soil Cuttings and Capped with Cold Patch Asphalt
GROUNDWATER
READINGS
DURING DRILLING AFTER DRILLING (DATE)
NE
BOREHOLE LOCATION (Lat/Long or North/East and Datum)
34.0083 -118.1023
HOLE ID
B-5
DATE
9-5-24
SHEET
1 of 1
Earth Mechanics, Inc.
Geotechnical and Earthquake Engineering
DESCRIPTION
MaterialGraphicsDrilling MethodCasing Depth
Remarks
Sample NumberBlows per 6 in.Recovery (%)MoistureContent (%)Dry Unit Weight(pcf)Shear Strength(tsf)
REPORT TITLE
BORING RECORD
ELEVATION (ft)
207.60
205.60
203.60
201.60
199.60
197.60
195.60
193.60
191.60
189.60
187.60
185.60
Sample LocationBlows per footGas Data
PROJECT OR BRIDGE NAME
Montebello Sewer Program
BRIDGE NUMBER
DEPTH (ft)
PREPARED BY
FO
CALTRANS BORING RECORD MET+ENG FIXED MONTEBELLO ON-CALL.GPJ EMI CALTRANS 2013 V2.0.GLB 9/19/24 0 1
2 3
4 5
6 7
8 9
10 11
12 13
14 15
16 17
18 19
20 21
22 23
24 25
Between South Second Street and South Third Street 209.6 ft
APPENDIX B
LABORATORY TEST RESULTS
TABLE B-1 SUMMARY OF LABORATORY TEST RESULTS
Project No. : 23-103-2 Project Name : MTC, Montebello Sewer Program B-1
B-1
B-1
B-1
B-1
B-1
B-2
B-2
B-2
B-2
B-2
B-2
B-3
B-3
B-4
B-4
B-4
B-4
B-4
B-4
B-5
B-5
22/18/4
D-5
CL-ML 13.9 135.8 5
10 12.5
D-1
14 0
5 7.5
10 B-0
D-1
5 12.5
14 0
5 741
5 153
14 0
5 7.5
196
5 105
129.9
5 127.5
2.3 1.25
118.2
>4.5
>4.5
CL
124.5
134.4
14.0 >4.5
CL
SC-SM
28.7 116.5
CL 27.2 120.9
ML
SP-SM
ML 29.7
SM
19.3 15.7
15.6 11.1
15.5 10.7
SC
CL-ML
CL
CL
Moisture
Content
ASTM
D2216
Total Unit
Weight
ASTM D2937
( % ) (pcf)
11.9 100.2
120.4
Pocket
Penetrometer
Torvane
Shear
Grain Size
Distribution
GR:SA:FI
Max. Dry
Density/OPT
Moisture
Atterberg
Limits
ASTM
D4318
SoilMinimum
Resistivity
CT-643
( LL/PL/PI ) (ohm-cm) (ppm) (ppm)
0:8:92
SoilpH
CT-643
SoilMoisture
Free
Chloride
Content
CT-422
Soil-Soluble
Sulfate
Content
CT-417
7.7 285 153
2.1 11.6
106.3
137.2
3.0 3:48:49
19.0 25.7
0:25:75
0:24:76
0:95:5
3800
Boring No . Sample
No.
Sample
Depth
Soil
Identification
(group symbol)
ASTM
D2488/D2487
D-3
D-4
0 7.5
10 12.5
B-0
D-2
(ft) (tsf)
CL
5 (tsf)
D-2
D-3
D-4
13.8 136.1
132.0
(%)
B-0
B-1
D-5
B-0
B-1
D-1
B-0
D-2
D-3
D-4
D-5
7800
SP
SP
CL-ML 12.0 7.6
12.5 3:35:62
311
0:33:67
2:32:66
1:28:71 8.3
128.3/9.5
4:35:61 106
0:20:80
0:19:81
22/17/5
CL-ML
107.4
CL 31/15/16
0:32:68
26/14/12
20/13/7
20/13/7
1:96:3
2:35:63
2900
0 CL 13.9
ML
CL
8.2 22/13/9
4000
COMPACTION TEST
Client: Earth Mechanics Inc. AP Number: 24-0908
Project Name: MTC, Montebello Sewer Program Tested By: TV Date: 09/11/24 Project No. : 23-102-3 Calculated By: JG Date: 09/12/24 Boring No.: B-1 Checked By: AP Date: 09/13/24
Sample No.: B-0 Depth (ft.): 0-5
Visual Sample Description: Lean Clay with Sand
Compaction Method X ASTM D1557
ASTM D698
METHOD A Preparation Method Moist
MOLD VOLUME (CU.FT) 0.0333 X Dry
Wt. Comp. Soil + Mold (gm.) 3804 3943 3963 3895
Wt. of Mold (gm.) 1851 1851 1851 1851
Net Wt. of Soil (gm.) 1953 2092 2113 2045
Container No.
Wt. of Container (gm.) 149.30 149.56 149.66 149.87
Wet Wt. of Soil + Cont. (gm.) 613.13 670.29 642.21 670.96 Dry Wt. of Soil + Cont. (gm.) 580.70 622.39 586.97 602.96 Moisture Content (%) 7.52 10.13 12.63 15.01
Wet Density (pcf) 129.17 138.36 139.72 135.22
Dry Density (pcf) 120.14 125.63 124.05 117.57
Maximum Dry Density (pcf) 126.1 Optimum Moisture Content (%) 11.0 Maximum Dry Density w/ Rock Correction (pcf) N/A Optimum Moisture Content w/ Rock Correction (%) N/A
PROCEDURE USED
X METHOD A: Percent of Oversize: 0.1%
Soil Passing No. 4 (4.75 mm) Sieve
Mold : 4 in. (101.6 mm) diameter
Layers : 5 (Five)
Blows per layer : 25 (twenty-five)
METHOD B: Percent of Oversize: N/A
Soil Passing 3/8 in. (9.5 mm) Sieve
Mold : 4 in. (101.6 mm) diameter
Layers : 5 (Five)
Blows per layer : 25 (twenty-five)
METHOD C: Percent of Oversize: N/A
Soil Passing 3/4 in. (19.0 mm) Sieve
Mold : 6 in. (152.4 mm) diameter
Layers : 5 (Five)
Blows per layer : 56 (fifty-six)
100
110
120
130
140
0 10 20 30 40
Dry Density (pcf)
Moisture (%)
100% Saturation @ S.G.= 2.6
100% Saturation @ S.G.= 2.7
100% Saturation @ S.G.= 2.8
Ultimate : Shear Type : Peak :
Boring No. : 0.55 (ksf) 0.18 (ksf)
Sample No. : 26.14 (kPa) 8.62 (kPa)
Depth (ft/m) : 7.5 0.00 Friction Angle ( ) : 42.42 Degree 34.97 Degree Description : Brown, SILTY CLAYEY SAND (SC-SM) Shear Rate (inch/minute) : 0.02
VOID NORMAL STRESS
(pcf) (kN/m3
) RATIO (ksf) (kPa) (ksf) (kPa) (ksf) (kPa)
116.81 18.39 0.44 0.50 23.94 1.03 49.41 0.47 22.41
122.05 19.21 0.38 1.00 47.88 1.42 67.80 0.97 46.54
121.48 19.12 0.39 2.00 95.76 2.39 114.34 1.55 74.12
0.00 0.00 0.55 26.14 0.18 8.62
2.0 95.76 2.37 113.64 1.58 75.60
Figure No.
Field Moisiture Undisturbed
B-2 Strength Intercept (C) : D-2 Peak Ultimate
SYMBOL
MOISTURE DRY DENSITY PEAK STRESS ULTIMATE STRESS
CONTENT (%)
11.63 11.52
11.59 MTC, Montebello Sewer Program
DIRECT SHEAR TEST
(ASTM D-3080) Project No. : 23-102-3 Date : 09/05/24
0.0 0.5
1.0 1.5
2.0 2.5
3.0 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.50 Shear Stress in (ksf)
Horizontal Deformation (inch)
0.0 0.5
1.0 1.5
2.0 2.5
3.0 0.0 0.5 1.0 1.5 2.0 2.5
Shear Stress in (ksf)
Normal Stress (ksf)
Ultimate : Shear Type : Peak :
Boring No. : 0.40 (ksf) 0.10 (ksf)
Sample No. : 19.25 (kPa) 4.88 (kPa)
Depth (ft/m) : 10.0 0.00 Friction Angle ( ) : 42.10 Degree 35.30 Degree Description : Brown, SANDY SILT (ML) Shear Rate (inch/minute) : 0.02
VOID NORMAL STRESS
(pcf) (kN/m3
) RATIO (ksf) (kPa) (ksf) (kPa) (ksf) (kPa)
93.90 14.78 0.80 0.50 23.94 0.90 43.09 0.47 22.41
95.92 15.10 0.76 1.00 47.88 1.24 59.18 0.79 37.92
92.96 14.63 0.81 2.00 95.76 2.23 106.87 1.52 72.97
0.00 0.00 0.40 19.25 0.10 4.88
2.0 95.76 2.21 105.76 1.52 72.68
Figure No.
Date : 09/05/24
DIRECT SHEAR TEST
(ASTM D-3080) Project No. : 23-102-3
MTC, Montebello Sewer Program
26.43 25.66
25.67 SYMBOL
MOISTURE DRY DENSITY PEAK STRESS ULTIMATE STRESS
CONTENT (%)
D-3 Ultimate
B-4 Strength Intercept (C) : Peak
Field Moisiture Undisturbed
0.0 0.5
1.0 1.5
2.0 2.5
0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.50
Shear Stress in (ksf)
Horizontal Deformation (inch)
0.0 0.5
1.0 1.5
2.0 2.5
0.0 0.5 1.0 1.5 2.0 2.5
Shear Stress in (ksf)
Normal Stress (ksf)
Boring
No.
Sample
No.
Depth
(ft)
Dry
Density
(pcf)
Moisture
Content
(%)
Conf.
Stress
(ksf)
Max Dev.
Stress (ksf)
Initial
Saturation
(%)
B-2 D-1 5 120.9 13.78 0.43 9.26 94.4
23-103-3 Date : 09/07/24 Figure No. :
MTC, Montebello Sewer Program
Soil Type
Reddish brown, Lean
CLAY with SAND (CL)
Project No. :
UNCONSOLIDATED UNDRAINED TEST
(ASTM D2850)
0.0 1.0
2.0 3.0
4.0 5.0
6.0 7.0
8.0 9.0
10.0 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0
Deviatoric Stress (ksf)
Axial Strain (%)
0.0 0.5
1.0 1.5
2.0 2.5
3.0 3.5
4.0 4.5
0.0 2.0 4.0 6.0 8.0 10.0 12.0
Shear Stress (ksf)
Normal Stress (ksf)
Boring
No.
Sample
No.
Depth
(ft)
Dry
Density
(pcf)
Moisture
Content
(%)
Conf.
Stress
(ksf)
10% Axial
Strain Dev.
Stress (ksf)
Initial
Saturation
(%)
B-4 D-1 5 111.9 15.69 0.43 1.99 83.7
23-103-3 Date : 09/07/24 Figure No. :
MTC, Montebello Sewer Program
Soil Type
Reddish brown, Lean
CLAY withSAND (CL)
Project No. :
UNCONSOLIDATED UNDRAINED TEST
(ASTM D2850)
0.0 0.5
1.0 1.5
2.0 2.5
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0
Deviatoric Stress (ksf)
Axial Strain (%)
0.0 0.2
0.4 0.6
0.8 1.0
1.2 0.0 0.5 1.0 1.5 2.0 2.5 3.0
Shear Stress (ksf)
Normal Stress (ksf)
Project Name: MTC, Montebello Sewer Program Tested By:
Computed By:
Checked By:
Depth (ft.): 0-5
Project Number: 23-102-3
Boring No.: B-1
Sample No.: B-0
Location: N/A
Soil Description: Lean Clay with Sand
Mold Number A B C
Water Added, g 0 40 53
Compact Moisture(%) 13.1 17.2 18.6
Compaction Gage Pressure, psi 350 75 50
Exudation Pressure, psi 681 356 243
Sample Height, Inches 2.4 2.5 2.6
Gross Weight Mold, g 3048 3050 3056
Tare Weight Mold, g 1965 1965 1967
Net Sample Weight, g 1083 1085 1090
Expansion, inchesx10-4 60 1 4
Stability 2,000 (160 psi) 30/70 64/134 67/144
Turns Displacement 4.65 6.12 6.15
R-Value Uncorrected 41 7 4
R-Value Corrected 38 7 5
Dry Density, pcf 120.9 112.2 107.1
Traffic Index 8.0 8.0 8.0
G.E. by Stability 1.18 1.77 1.82
G.E. by Expansion 0.20 0.00 0.01
Date:
5 5
AP 09/13/24
(by Exudation)
R-VALUE TEST DATA
ASTM D2844
09/11/24
Date:
KM Date:
ST 09/10/24
Gf = 1.34, and 0.0 %
Retained on the ¾"
*Not Applicable
Remarks
By Exudation:
By Expansion:
At Equilibrium:
*N/A
R-VALUE
0 10
20 30
40 50
60 70
80 90
100
100200300400500600700800 0
R-VALUE
EXUDATION PRESSURE - PSI
0.00 1.00
2.00 3.00
4.00 0.00 1.00 2.00 3.00 4.00
COVER THICKNESS BY STABILOMETER (FT.)
COVER THICKNESS BY EXPANSION (FT.)
Project Name: MTC, Montebello Sewer Program Tested By:
Computed By:
Checked By:
Depth (ft.): 0-5
Project Number: 23-102-3
Boring No.: B-4
Sample No.: B-0
Location: N/A
Soil Description: Sandy Lean Clay
Mold Number F D E
Water Added, g 8 0 -23
Compact Moisture(%) 18.0 17.2 15.0
Compaction Gage Pressure, psi 50 75 150
Exudation Pressure, psi 207 378 480
Sample Height, Inches 2.5 2.5 2.5
Gross Weight Mold, g 2938 3028 3070
Tare Weight Mold, g 1868 1954 1963
Net Sample Weight, g 1071 1075 1107
Expansion, inchesx10-4 15 7 75
Stability 2,000 (160 psi) 75/155 65/136 52/115
Turns Displacement 5.09 5.58 4.58
R-Value Uncorrected 2 7 18
R-Value Corrected 2 7 18
Dry Density, pcf 110.0 111.2 116.7
Traffic Index 8.0 8.0 8.0
G.E. by Stability 1.88 1.77 1.57
G.E. by Expansion 0.05 0.02 0.25
Date:
4 4
AP 09/13/24
(by Exudation)
R-VALUE TEST DATA
ASTM D2844
09/11/24
Date:
KM Date:
ST 09/10/24
Gf = 1.34, and 0.8 %
Retained on the ¾"
*Not Applicable
Remarks
By Exudation:
By Expansion:
At Equilibrium:
*N/A
R-VALUE
0 10
20 30
40 50
60 70
80 90
100
100200300400500600700800 0
R-VALUE
EXUDATION PRESSURE - PSI
0.00 1.00
2.00 3.00
4.00 0.00 1.00 2.00 3.00 4.00
COVER THICKNESS BY STABILOMETER (FT.)
COVER THICKNESS BY EXPANSION (FT.)
APPENDIX “E”
PROJECT LABOR AGREEMENT NO. 4202
AGREEMENT NO. 4202 – LOS ANGELES/ORANGE
COUNTIES BUILDING AND CONSTRUCTION
TRADES COUNCIL AND THE SIGNATORY CRAFT
COUNCILS AND UNIONS
Print Form
Revised 2011
Notice of Exemption Appendix E
To: Office of Planning and Research From: (Public Agency): City of Montebello P.O. Box 3044, Room 113
Sacramento, CA 95812-3044
County Clerk
1600 W. Beverly Boulevard
Montebello, CA 90640
County of: Los Angeles (Address)
Project Title: CP No. 919 Downtown Sewer Replacement
Project Applicant: City of Montebello
Project Location - Specific: Whittier Boulevard between Montebello Boulevard and the west City limits, including the alleyways north and south of Whittier Boulevard.
Project Location – City: Montebello Project Locations – County: Los Angeles Description of Nature, Purpose and Beneficiaries of Project: Replacement of 5,100 linear feet of cement sewer in the City’s downtown area.
Name of Public Agency Approving Project: City of Montebello Name of Person or Agency Carrying Out Project: Cesar Roldan, Director of Public Works Exempt Status: (check one):
Ministerial (Sec. 21080(b)(1); 15268);
Declared Emergency (Sec. 21080(b)(3); 15269(a)); Emergency Project (Sec. 21080(b)(4); 15269(b)(c)); Categorical Exemption. State type and section number: §15282(k) (Other Statutory Exemptions) Statutory Exemptions. State code number:
Reasons why project is exempt: Environmental Assessment pursuant to California State California Environmental Quality Act (CEQA) Guidelines §15282(k) (Other Statutory Exemptions). This exemption allows for installation of new pipeline or maintenance, repair, restoration, removal, or demolition of an existing pipeline as set forth in Section 21080.21 of the Public Resources Code.
Lead Agency
Contact Person: Cesar Roldan Area Code/Telephone/Extension: 323-887-1462 If filed by applicant:
1. Attach certified document of exemption finding.
2. Has a Notice of Exemption been filed by the public agency approving the project? Yes No Signature: Date: June 12, 2025 Title: Director of Public Works Signed by Lead Agency Signed by Applicant
Authority cited: Sections 21083 and 21110, Public Resources Code. Date Received for filing at OPR:
Reference: Sections 21108, 21152, and 21152.1, Public Resources Code.
Attachment C
ITEM # 18
CITY OF MONTEBELLO
CITY COUNCIL AGENDA STAFF REPORT
TO: Honorable Mayor and City Council Members
FROM: Raul Alvarez, City Manager
BY: Cesar Roldan, Director of Public Works
SUBJECT: ADOPT RESOLUTION NO. 25-42 ADOPTING THE 2025 SANITARY SEWER MANAGEMENT PLAN AND AUTHORIZING THE RECERTIFICATION WITH THE STATE WATER RESOURCES CONTROL
BOARD (SWRCB)
DATE: June 11, 2025
RECOMMENDATIONS:
It is recommended that the City Council:
1. Approve Resolution No. 25-42 adopting the 2025 Sewer System Management Plan; and
2. Authorize the Director of Public Works to re-certify the 2025 Sanitary Sewer Management Plan with the State Water Resources Control Board (SWRCB); and
3. Take such additional, related action that may be desirable.
FISCAL IMPACT:
There is no fiscal impact associated with the adoption of the Sewer System Management Plan.
BACKGROUND/DISCUSSION:
The City updates the Sanitary Sewer Management Plan (SSMP) to remain consistent with General Plan, provisions of wastewater service, and to comply with statewide General Waste Discharge Requirements (GWDR). To provide a consistent, statewide regulatory approach to address sanitary sewer spills, the State Water Resources Control Board (SWRCB) adopted statewide General Waste Discharge Requirements for Sanitary Sewer Systems, Water Quality Order No. 2022-0103-DWQ (Sanitary Sewer Systems General Order) on December 6, 2022. The Sanitary Sewer Systems General Order
CITY COUNCIL AGENDA REPORT - MEETING OF JUNE 11, 2025
(Order), made effective by the SWRCB on June 5, 2023, requires public agencies that own or operate sanitary sewer systems to develop and implement sewer system management plans and report all sanitary sewer spills to the State Water Board’s online California Integrated Water Quality System (CIWQS) Sanitary Sewer System Database.
The City is required to comply with these requirements, which indicate that an updated and approved SSMP must be adopted by August 4, 2025.
The SSMP undergoes an internal audit at a minimum every two years and requires approval by the City Council (Attachment A) every five years, or when the audit identifies a major change is needed. The 2025 SSMP (Attachment B) is a living document that requires updates that rely on the varying changes to the City’s programs, policies, statewide mandates, etc. in compliance with the new order. The SSMP is an effective tool for the ongoing management of the City’s sanitary sewer network and preventing sanitary sewer overflows. The SSMP focuses on the City’s effort to comply with State measures and regulations.
ENVIRONMENTAL:
The SSMP update primarily incorporates continuing administrative and maintenance activities, including updates to procedures and operations of existing facilities in accordance with GWDRs, and as a result, the SSMP is not subject to the California Environmental Quality Act (CEQA) in accordance with Section 15378(b)(2) of California Code of Regulations, Title 14, Division 6, Chapter 3 Under the California Code of Regulations, Title 14, Division 6, Chapter 3 (CEQA Guidelines); provided, that even if CEQA applied, the administrative and maintenance activities of the SSMP update, primarily ministerial in nature, would involve operation, repair, maintenance or minor alteration of existing public facilities involving negligible or no expansion of existing or former use and would qualify as a Class 1 exemption under CEQA Guidelines Section 15301. Accordingly, no further environmental review is necessary.
ANALYSIS:
N/A
SUMMARY:
Staff recommend City Council approve Resolution No. 25-42 to adopt the 2025 Sewer System Management Plan; and, authorize the Director of Public Works to re-certify the 2025 Sanitary Sewer Management Plan with the State Water Resources Control Board.
ATTACHMENT(S)
1. Attachment A - Resolution No. 25-42
2. Attachment B - Sanitary Sewer Management Plan May 2025
Attachment A
RESOLUTION NO. 25-42
RESOLUTION OF THE CITY OF MONTEBELLO APPROVING AND
ADOPTING THE UPDATED SEWER SYSTEM MANAGEMENT PLAN
AND CERTIFYING THE MATERIAL CONSISTENCY WITH THE
STATEWIDE WASTE DISCHARGE REQUIREMENTS UNDER THE
GENERAL ORDER FOR SANITARY SEWER SYSTEMS
RECITALS
WHEREAS, on May 2, 2006, the State Water Resources Control Board (SWRCB) adopted Order No. 2006-0003, the Statewide General Water Discharge Requirements (WDRs) for Sanitary Sewer Systems;
WHEREAS, these Waste Discharge Requirements (WDRs) serve as the regulatory framework for all public agencies that own or operate sanitary sewer collection systems exceeding one mile in length and that transport untreated or partially treated wastewater to a publicly owned treatment facility;
WHEREAS, the objectives of WDRs are to reduce the frequency and volume of Sanitary Sewer Overflows (SSOs) by requiring public agencies to properly manage, operate, and maintain their wastewater collection system. This is to be done by developing, implementing, and updating an agency-specific Sewer System Management Plan (SSMP);
WHEREAS, on December 6, 2022, the SWRCB adopted Order No. 2022-103- DWQ, Statewide WDRs - General Order for Sanitary Sewer Systems, which became effective on June 5, 2023, and superseded Order No. 2006-0003; and WHEREAS, the SSMP update primarily incorporates continuing administrative and maintenance activities, including updates to procedures and operations of existing facilities in accordance with WDRs, and as a result, the SSMP is not subject to the California Environmental Quality Act (CEQA) in accordance with Section 15378(b)(2) of California Code of Regulations, Title 14, Division 6, Chapter 3 Under the California Code of Regulations, Title 14, Division 6, Chapter 3 (CEQA Guidelines); provided, that even if CEQA applied, the administrative and maintenance activities of the SSMP update, primarily ministerial in nature, would involve operation, repair, maintenance or minor alteration of existing public facilities involving negligible or no expansion of existing or former use and would qualify as a Class 1 exemption under CEQA Guidelines Section 15301. Accordingly, no further environmental review is necessary.
NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF MONTEBELLO HEREBY RESOLVES, FINDS, AND DECLARES AS FOLLOWS:
SECTION 1. AUTHORITY. The Council hereby approves the City's Sewer System Management Plan Update and certifies it is consistent with Statewide General Waste Discharge Requirements for Sanitary Sewer Systems.
RESOLUTION NO. 25-42
SECTION 2. ADOPTION. The City of Montebello approves the adoption of the SSMP.
SECTION 3. STATEMENTS. The City of Montebello finds that the SSMP update is not a "project" subject to the California Environmental Quality Act (CEQA) in accordance with Section 15378(b)(2) of California Code of Regulations, Title 14, Division 6, Chapter 3; provided, that even if CEQA applied, it would be categorically exempt pursuant to CEQA Guidelines Section 15301, and staff is authorized to file any notices that it believes appropriate.
SECTION 4. PUBLIC OFFICIALS AND EMPLOYEES DESIGNATED. The City of Montebello through the adoption of the SSMP, authorizes staff to certify and upload the SSMP update to the online California Integrated Water Quality System (CIWQS) and make the SSMP available on the City’s website.
SECTION 5. EFFECTIVE DATE. This Resolution shall take effect immediately upon its adoption by the City Council and the City Clerk shall certify to the passage and adoption of this resolution.
RESOLUTION NO. 25-42
APPROVED AND ADOPTED THIS 11th DAY OF JUNE 2025.
_______________________________
Salvador Melendez, Mayor
ATTEST: APPROVED AS TO FORM:
________________________________ ________________________________ Christopher Jimenez, City Clerk Arnold M. Alvarez-Glasman, City Attorney
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) SS:
CITY OF MONTEBELLO )
I, Christopher Jimenez, City Clerk of the City of Montebello, County of Los Angeles, State of California, hereby certify that the foregoing Resolution No. 25-42 was passed and adopted by the City Council of the City of Montebello, signed by the Mayor and attested by the City Clerk at a regular meeting of said Council held on the 11th day of June 2025 and that said Resolution was adopted by the following vote, to-wit:
AYES:
NOES:
ABSTAIN:
ABSENT:
The undersigned, City Clerk of the City of Montebello, does hereby attest and certify that the foregoing Resolution is a true, full and correct copy of a resolution duly adopted at a meeting of said City which was duly convened and held on the date stated thereon, and that said document has not been amended, modified, repealed or rescinded since its date of adoption and is in full force and effect as of the date hereof.
DATE:
Christopher Jimenez, City Clerk
City of Montebello
Sewer System Management Plan (SSMP) May 2025
CITY OF MONTEBELLO
SEWER SYSTEM MANAGEMENT PLAN
3060 Saturn Street, Suite 250
Brea, CA 92821
714-940-0100
May 2025
Prepared for:
City of Montebello
Department of Public Works
1600 W Beverly Blvd
Montebello, CA 90640
Prepared By:
Attachment B
City of Montebello
Sewer System Management Plan (SSMP) May 2025
i
TABLE OF CONTENTS
INTRODUCTION .............................................................................................. 1
1.0 GOALS AND ACTIONS ............................................................................. 3
1.1 Goals of SSMP ...................................................................................... 3
1.2 Actions of SSMP .................................................................................... 3
1.3 SSMP Update Schedule .......................................................................... 4
2.0 THE ORGANIZATION .............................................................................. 4
2.1 Management ......................................................................................... 4
2.2 Authorized Representative ..................................................................... 5
2.3 Organization Chart and Responsibilities ................................................... 5
2.3.1City of Montebello Organization Chart for Sanitary Sewer System Management ................................................................................................ 6
2.3.2 Description of Responsibilities .............................................................. 7
2.3.3 City Divisions/Departments and Other Agencies .................................... 8
2.3.4 Chain of Communication for SSO Reporting .......................................... 9
2.3.4a City’s SSO Reporting Procedures Flow Chart....................................... 10
2.3.5 City’s Contact Directory for SSO Responding and Reporting ................. 11
3.0 LEGAL AUTHORITY .............................................................................. 12
3.1 Legal Authority .................................................................................... 12
3.1.1 Prevention of Illicit Discharges into the Sanitary Sewer System ............ 12
3.1.2 Legal Authority to Require that Sewers and Connections be properly Designed and Constructed .......................................................................... 13
3.1.3 Legal Authority to Ensure Access for Maintenance, Inspection .............. 14
3.1.4 Limit the Discharge of FOG and other Debris that may cause Blockage . 14
3.1.5 City to Enforce any Violation of Sewer Ordinances ............................... 15
4.0 OPERATION AND MAINTENANCE PROGRAM .......................................... 15
4.1 City Sewer Mapping System ................................................................. 16
4.2 Preventive Operation and Maintenance Program.................................... 16
4.2.1 Sewer Line and Manhole Inspection ................................................... 17
4.2.2 Gas Trap Manholes and Siphons......................................................... 17
4.2.3 Drop Manholes .................................................................................. 17
4.2.4 Sewer Line Cleaning .......................................................................... 17
4.2.5 Vermin and Rodent Control ................................................................ 17
4.2.6 Work Scheduling ............................................................................... 17
4.3 Rehabilitation and Replacement Plan .................................................... 18
4.3.1 Capital Improvement Programs .......................................................... 18
4.3.2 Condition Assessment Program .......................................................... 19
4.3.3 Equipment Maintenance and Replacement Policy ................................ 19
4.4 Training for Field Operations Personnel and Contractors ........................ 19
5.0 DESIGN AND PERFORMANCE PROVISION .............................................. 20
5.1 Design and Construction Standards and Specifications ........................... 20
City of Montebello
Sewer System Management Plan (SSMP) May 2025
ii
5.2 Procedures and Standards for inspection and Testing New and Rehabilitated Collection Sewer Facilities. ...................................................... 20
6.0 OVERFLOW EMERGENCY RESPONSE PLAN ............................................. 21
6.1 Overflow Response Procedure .............................................................. 22
6.1.1 Regulatory Agencies Notification and Time Frame ............................... 23
6.1.1 b Agencies Telephone/Fax Numbers ................................................... 23
6.1.2 Emergency Response Plan Procedure ................................................. 23
6.1.3 Summary of MRP Requirements ......................................................... 27
6.1.4 Spill Notification, Reporting, Record Keeping and Time Period .............. 29
6.1.5 Post Clean Up Activities ..................................................................... 31
6.1.6 Emergency Response and Personnel ................................................... 31
6.1.7 Training ............................................................................................ 32
6.1.8 Records Retention ............................................................................. 32
7.0 FOG CONTROL PROGRAM ..................................................................... 33
7.1 Public Education Outreach Program ...................................................... 33
7.2 Disposal Methods for FOG Generated within the City’s Sanitary Sewer .... 34
7.3 The Legal Authority to Prohibit Discharges to the System and Identify Measures to Prevent SSOs and Blockages Caused by Fog ............................. 34
7.4 Requirements, Design Standards for Grease Removal Devices, Maintenance, BMP, Record Keeping and Reporting Requirements ................. 35
7.5 Authority to Inspect Grease Producing Facilities, Enforce Authorities, and Evidence of Adequate Staffing To Inspect and Enforce the FOG Ordinance .... 37
7.6 Cleaning Schedule for Identified FOG Prone Sewer Segments ................. 37
7.7 Source Control of FOG ......................................................................... 38
8.0 SYSTEM EVALUATION AND CAPACITY ASSURANCE PLAN ....................... 38
8.1 System Evaluation and Capacity Assurance ........................................... 39
8.2 Adequate Capacity and Correct Design ................................................. 40
8.3 Capacity Enhancement Plan ................................................................. 41
9.0 MONITORING, MEASUREMENT, MODIFICATION PROGRAM .................... 41
9.1 Performance Measures ........................................................................ 41
9.2 SSMP Program Effectiveness Evaluation ................................................ 42
9.3 Preventative Maintenance Program Modification .................................... 42
9.4 Update Program Elements ................................................................... 42
9.5 Identify and illustrate SSO trends ......................................................... 42
10.0 SSMP PROGRAM AUDIT AND CERTIFICATION ........................................ 43
10.1 SSMP Program Audit .......................................................................... 43
10.2 SSMP Certification .............................................................................. 44
10.3 SSMP Modification and Re-certification ................................................ 44
11.0 COMMUNICATION AND SSMP AVAILABILITY .......................................... 44
11.1 Communication .................................................................................. 44
11.2 SSMP Availability ................................................................................ 44
City of Montebello
Sewer System Management Plan (SSMP) May 2025
iii
APPENDICES
Appendix A SWRCB Order 2006-003, WQ-2013-0058 EXEC
Appendix B Location Map/Operation Maintenance Yard
Appendix C Key Staff Contact Information
Appendix D Inventory of City Collection Facilities & Map Appendix E Condition Assessment Work Schedule CCTV
Appendix F SSMP Audit Report
Appendix G Spill Report Procedures
Appendix H Sewer Maintenance District Agreement
City of Montebello
Sewer System Management Plan (SSMP) May 2025
iv
ABBREVIATIONS/ACRONYMS
ACO Accumulative Capital Outlay Program
APWA American Public Works Association
CADD Computer Aided Design Drafting
CALOSHA California Occupation, Safety And Health Administration CIWQS California Integrated Water Quality System
CCTV Closed Circuit Television
CMC City Municipal Codes
CSMD Consolidated Sewer Maintenance District
FOG Fats, Oil, and Grease
GIS Geographical Information System
HDPE High Density Polyethylene Pipe
I/I Infiltration inflow
LAC DPW Los Angeles County Department of Public Works
LACO CODE Los Angeles County Code Title 20 - Utilities
LACO PLUMBIMG CODE Los Angeles County Plumbing Code – Title 28 LACSD Los Angeles County Sanitation District
LACSMD Los Angeles County Sewer Maintenance District
MMS Maintenance Management System
NOI Notice of Intent
MRP Monitoring and Reporting Programs
OES Office of Emergency Service
RWQCB Regional Water Quality Control Board
SMP Sewer Master Plan
SMD Sewer Maintenance District
SO&M Sewer Operation and Maintenance
SSMP Sewer System Management Plan
SSOs Sanitary Sewer Overflows
SSOERP Sanitary Sewer Overflow Emergency Response Plan
SSSWDR Sanitary Sewer System Waste Discharge Requirements SU Sewage Unit
SWRCB State Water Resources Control Board
WDRs Statewide General Waste Discharge Requirements
City of Montebello
Sewer System Management Plan (SSMP) May 2025
v
DEFINITIONS
Geographical Information System (GIS) – A database linked with mapping, which includes various layers of information used by government officials. Examples of information found on a GIS can include a sewer map; sewer features such as pipe location, diameter, length, material, condition, last date cleaned or repaired. The GIS also typically contains base information such as streets and parcels.
Infiltration/Inflow (I/I) – Infiltration is generally considered to be extraneous water that enters the sewer system over longer periods of time, such as groundwater seepage through cracks in the sewer. Inflow is generally considered to be extraneous water that enters the system as a direct result of a rain event, such as through defects in the sewer.
While it is impossible to control all I/I, it is certainly desirable to reduce I/I when costeffective.
Lateral – The portion of sewer that connects a home or business with the main line in the street.
Stoppage – A build-up of debris in the sewer, which stops the flow of wastewater and allows the water to back up behind the stoppage, sometimes causing an overflow. Also called blockage.
Blockage – A build-up of debris in the sewer, which stops the flow of wastewater and allows the water to back up behind the stoppage, sometimes causing an overflow. Also called a stoppage.
Wastewater Collection System – All pipelines, pump stations, and other facilities upstream of the head works of the wastewater treatment plant that transport wastewater from its source to the wastewater treatment plant.
City of Montebello
SSMP May 2025
1 CITY OF MONTEBELLO
SEWER SYSTEM MANAGEMENT PLAN (SSMP)
INTRODUCTION
On May 2, 2006 the State Water Resources Control Board (SWRCB) adopted a Statewide General Waste Discharge Requirements (WDR) and Monitoring and Reporting Program (MRP), for sanitary sewer systems by issuing Order No. 2006-003 (Appendix A). The regulations in the Order were in response to growing public concern about the water quality impacts of Sanitary Sewer Overflows (SSOs), particularly those that cause beach closures, adverse effects to other bodies of water, or pose serious health and safety or nuisance problems. The order requires all federal and state agencies, municipalities, counties, districts, cities, and other public entities that own or operate a sanitary sewer system greater than one mile in length to comply with the requirements of the WDR and to develop and implement a Sewer System Management Plan (SSMP).
The City’s original SSMP was adopted by the City Council and certified with the SWRCB.
Pursuant to Section D.14 of the WDRs which requires that the SSMP is required to be updated every six (6) years.
Additionally, SWRCB Order WQ 2008-0002-EXEC amended the WDR on February 20, 2008. The revised order requires that the notification and reporting of sanitary sewer overflows (SSO) to regulatory agencies follow a strict timeline. SWRCB Order WQ 2013- 0058-EXEC amended the Monitoring and Reporting Program (MRP) (Order WQ 2008- 0002-EXEC) for the SSSWDR effective September 9, 2013. Several major changes were made to the public notification, reporting, water quality monitoring, recording keeping, and certification requirements. The revised order also requires the submission of an electronic copy of the SSMP to the SWRCB or the web address where it posted. This SSMP has been prepared in accordance with the following:
• SWRCB Order 2006-0003-DWQ, Statewide General Waste Discharge Requirements for Sanitary Sewer System.
• SWRCB Order WQ 2008-0002-EXEC, Adopting Amended Monitoring and Reporting Requirements for Statewide General Waste Discharge Requirements for Sanitary Sewer Systems.
• SWRCB Order WQ 2013-0058-EXEC, Amending Monitoring and Reporting Program for Statewide General Waste Discharge Requirements for Sanitary Sewer Systems.
City of Montebello
Sewer System Management Plan (SSMP) May 2025
2 The SSSWDR includes directives for the management, operation, and maintenance of the sanitary sewer system as well as proper control, containment, and cleanup of any SSOs that occur. They also require that SSOs be reported to the SWRCB using the online California Integrated Water Quality System (CIWQS).
In compliance with the SWRCB guidelines, this document is prepared to meet the objectives contained in the WDR Order. The City of Montebello operates and maintains the sanitary sewer conveyance system pipelines serving its population of approximately 62,640. The City’s sewer lines discharge to a network of trunk sewer lines owned and operated by the Los Angeles County Sanitation Districts (LACSD).
The document is divided into 11 chapters, which closely align with the respective provisions contained in the WDR’s. Every section or subsection of each chapter addresses one of the key elements of the SSMP directive. The document, with other existing Agency Programs referenced herein, constitute the City’s SSMP. By implementing the procedures contained in this SSMP, the occurrence of SSOs should decrease or possibly be avoided throughout the City’s Sanitary Sewer Collection System.
The organization of this SSMP is consistent with the SWRCB guidelines and includes the following eleven SSSWDR elements:
1. Goals
2. Organization
3. Legal Authority
4. Operation and Maintenance Program
5. Design and Performance Provisions
6. Overflow Emergency Response Plan
7. Fats, Oil, and Grease Control Program
8. System Evaluation and Capacity Assurance Plan
9. Monitoring, Measurement and Plan Modifications
10.SSMP Program Audits
11.Communication Program
City of Montebello
Sewer System Management Plan (SSMP) May 2025
3 1.0 GOALS AND ACTIONS
1.1 Goals of SSMP:
1. The City’s sanitary sewer collection system is properly operated, maintained and managed to reduce frequency and severity of sanitary sewer overflows (SSOs) and their potential impacts on public health, safety, and the environment.
2. When an SSO occurs, prompt action is taken to identify, contain, and remove the cause; report the event to the appropriate regulatory authorities; and notify the public in a timely manner,
3. All SSOs, system deficiencies, and remedial actions taken are well documented, or
4. The City’s sewer system operators, employees, contractors, responders, and other agents are adequately trained and equipped to address an SSO event.
5. The City’s sewer system is designed, constructed and funded to provide adequate capacity to convey base flows and peak flows, while meeting or exceeding applicable regulations, laws and the generally accepted practices relative to sanitary sewer system operation and maintenance.
1.2 Actions of SSMP:
1. Conduct a planned and scheduled maintenance program to minimize the risk and occurrence of SSOs.
2. When an SSO occurs, respond to the incident in a timely manner and undertake feasible remedial actions to contain the overflow, including stopping the flow from reaching the storm drain, if possible.
3. Stop the sewer overflow as soon as possible and limit public access to the overflow area to prevent public contact with any wastewater contamination.
4. If possible, completely recover the overflow sewage, return it to the sewer system, and clean up the contaminated area.
5. Gather and compile all pertinent information regarding the sewer overflow incident, investigate as necessary to determine probable cause, document
City of Montebello
Sewer System Management Plan (SSMP) May 2025
4 findings, report the incident to the appropriate regulatory agencies in a timely manner, and file a copy of the report.
1.3 SSMP Update Schedule:
Pursuant to the General Order, The City of Montebello conducts program monitoring and triennial audits of its SSMP, prepares updates, and implements planned activities to achieve the City’s collection system program objectives.
This SSMP update was prepared upon completion of the most recent SSMP Program Audit dated February 2, 2025.
2.0 THE ORGANIZATION
The City’s organizational structure addresses the following SSMP components as stated in the SSSWDR Section D.13.(ii):
1) The name of the responsible or authorized representative as described in Section J of SWRCB Order No. 2006-0003.
2) The names and telephone numbers for management, administrative and maintenance positions responsible for implementing specific measures in the SSMP program. The SSMP must identify lines of authority through an organization chart or similar document with a narrative explanation; and
3) The chain of communication for reporting SSOs, from receipt of a complaint or other information, including the person responsible for reporting SSOs to the State and Regional Water Board and other agencies if applicable (such as County Health Officer, County Environmental Health Agency, Regional Water Board, and/or State Office of Emergency Services (OES)).
2.1 Management
The City serves a population of approximately 62,640 people in 2020 per US Census Bureau. The City’s Public Works Department (PWD) manages the City’s sanitary sewer collection system. The collection system consists of about 89.4 miles of gravity sewer lines and a total of 1,898 manholes. No pump station is equipped with these conveyance lines.
The City’s local sewers discharge into the Los Angeles County Sanitation District (LACSD) trunk sewer lines for conveyance, treatment, and disposal. The sewer mains range in size from 6 to 18 inches in diameter, with most of the pipes being vitrified clay sewer
City of Montebello
Sewer System Management Plan (SSMP) May 2025
5 pipes. Most of the City was developed during 1950-1975 and, as a result, most of the City’s sewer system is between 30-60 years old.
Beginning in 2021, the City began contracting Los Angeles County Sewer Maintenance Division. This yearly contract Sewer Maintenance Agreement includes: Visual Inspection of 2,000 manholes, CCTV Inspection of pipes (20% of system based on 5-year cycle), Preventative pipe cleaning (20% of system based on 5-year cycle), As-needed pipe cleaning ($100,000 budget), Sewer Remediation (Point Repair Budget $105,000) and Sewer Remediation (Pipe Lining Budget $160,000). The field operation and maintenance services are fulfilled by the Sewer Maintenance Division. The distribution of the City’s personnel and the contracted services are depicted in the organization chart presented in Section 2.3.1a of this plan. These personnel, in collaboration with City personnel, administer the City’s sewer collection system operation, provide engineering evaluation of proposed and existing sewer facilities, administer preventive maintenance and sewer construction programs, and oversee the maintenance of the sewer collection system facilities and related records and plans.
2.2 Authorized Representative
The City’s Director of Public Works is the authorized representative who is responsible for the execution of compliance actions required under the WDRs. This includes, but is not limited to, execution and certification of all reports and correspondence as required under the Order.
2.3 Organization Chart and Responsibilities
The organization chart, showing the structure, names and position titles, administrative, management and field positions relative to Sewer Operation and Maintenance (SO&M) is presented in Sections, 2.3.1a respectively and the descriptions of responsibilities and support are presented in Sections 2.3.2 and 2.3.3
6 City of Montebello Sewer System Management Plan (SSMP) May 2025 2.3.1 a City of Montebello Organization Chart for Sanitary Sewer System Management
City of Montebello
Sewer System Management Plan (SSMP) May 2025
7 2.3.2 Description of Responsibilities
• City Council - Responsible for establishing new and amending existing ordinances and policies governing the municipal operations, and the operations of the City’s sanitary sewer system including the approving of all SO&M contracts and agreements to protect the community’s interest.
• City Manager – Responsible for the overall management and application of all legal and policy directives that relate to the City’s activities, including the operation and maintenance of the City’s sanitary sewer system.
• Director of Public Works – Directs the accomplishment of statutory and policy criteria within the scope of the City Council’s policy and legal requirements. Directs its execution, and evaluates work accomplished within his areas of responsibility, including the SO&M program. Also directs the planning, budgeting, and design for the construction of new sewer collection system and rehabilitation of existing sewer collection system.
Facilitate all sewer collection system operation and maintenance activities through the City Maintenance crew to the sewer contractor. Responsible for the day-to-day management and operation oversight of the City’s sewer collection system. • City Engineer – Directs engineering and management activities relating to studies, design, investigations, and the preparation of reports, budget and contractual agreements with private firms for technical services projects. Provides special studies, investigations and reports concerning sewer infrastructure. • Assistant Engineer – Performs a wide range of professional & complex civil engineering work in re-design, construction, and management & maintenance of public works projects; acts as the City Engineer in his/her absence; performs other duties as assigned
• LA County Sewer Maintenance Division – Performs annual visual inspection of manholes, CCTV inspection of pipes, preventative pipe cleaning, as-needed pipe cleaning, sewer remediation point repairs and pipe lining. • Facilities & Maintenance Superintendent - Has oversight of all contracted maintenance and repair services for City’s facilities, excluding the relatively new gravity sewer systems operation and maintenance. Provides direct supervision to the Utilities O&M and Field Services Supervisors and oversees sewer operations and regulations.
City of Montebello
Sewer System Management Plan (SSMP) May 2025
8 • Office Administrative and Clerical Assistants - Assist in the preparation of reports, budgets, and other correspondence; coordinate and facilitate of City and contract personnel in addressing local citizen issues relative to sewer service.
2.3.3 City Divisions/Departments and Other Agencies
Other Divisions or Departments within the City, and specific contracted services, are currently and will continue to be responsible for carrying out some of the compliance actions called for by the WDR’s for the City. The key support units and their responsibilities are described below:
• Administrative Services Department - Responsible for procuring equipment and printing and mailing of public education outreach program materials, and for procuring material and supplies needed for the day-to-day operation and maintenance activities, accounting services and training of personnel. Also responsible for investigating SSO related claims and litigations against the city.
• Building and Safety Division - Responsible for reviewing various building permit applications, their relationship to public easements and facilities, and issuing permits for sewer connections. Also, the enforcement of the Plumbing Codes involving proper connection and discharge into the public sewer system and the property owner’s maintenance of their respective sewer laterals between the structure served and the public sewer collection main.
• Code Enforcement Division – Responsible for the enforcement of the Health and Safety Codes regarding waste disposal such as the FOG program, point source control inspection of industrial and commercial waste and grease generating facilities, and investigation of cases of illicit discharge of chemicals, debris, etc. into the public sewer system. This is undertaken in concert with the LAC DPW Environmental Programs Industrial Waste Unit.
• Engineering Division - Responsible for preparing plans and specifications for sewer construction and rehabilitation projects, and the administration of contracts for accomplishing such projects and emergency sewer repair projects. Also responsible for
City of Montebello
Sewer System Management Plan (SSMP) May 2025
9 subdivision or development project plan checks to ensure compliance with the City’s standards for construction of new sewer collection systems. Plan checks sewer capacity studies to size proposed sewer lines and sets requirements to ensure adequate capacity in existing systems. Prepares easement documents or identifies and procures access rights for public sewer facilities located within private properties. • Maintenance Division - Responsible for the day-to-day operation, reporting of SSO’s and coordination with LA County Sewer Maintenance Division for repairs. • Fire Department – Responsible for assisting with protecting the public in the event of an SSO that expands into high use public travel ways and/or those that reach storm drains or water courses and spread the effect of public risk to health and safety impacts.
• Police Department - Responsible for operating the Emergency Operation Center for the entire City including handling after hours service calls reporting SSOs, and pump station malfunction calls and forwarding those reports to the LACDPW.
2.3.4 Chain of Communication for SSO Reporting
The chain of communication for reporting SSOs, from receipt of a complaint or other reliable information source to reporting to the appropriate regulatory agencies, is presented in Section 2.3.4a below. The city’s contact directory for communicating with both internal and external parties involved in responding and reporting an SSO event is shown in Section 2.3.5. The SSO emergency response plan will be discussed in greater detail in Chapter 6 of this document including procedures for effective communication and reporting of spills from receipt of complaint, including the person responsible for reporting spills into the State Water Board’s CIWQS database.
City of Montebello
Sewer System Management Plan (SSMP) May 2025
10 2.3.4a City’s SSO Reporting Procedures Flow Chart
** LACFCD IS ONLY NOTIFIED WHEN SSO HAS ENTERED A STORM DRAIN SYSTEM. *** CIWQS ON LINE DATA BASE (http://ciwqs.waterboards.ca.gov/) Los Angeles County Health Department (LACHD) if the City has a contract with LA County Health Department.
IF 50,000 GALLONS OR GREATER DISCHARGED TO SURFACE WATER, TECH REPORT PER SECTION 6.1.3 OF SSMP PER ORDER 2013-0058-EXEC.
Yes Yes
No No
Yes
No
Yes Yes
Sewer Maint Staff
Stops SSO
Cleans up
Notification
Prepares report
Reports to radio room
SUBMIT DRAFT REPORT IN
3 BUSINESS DAYS &
CERTIFY IN 15 DAYS
SUBMIT REPORT CERTIFIED IN 30
DAYS
Enter Data into CIWQS***
SUBMIT DRAFT REPORT IN
3 BUSINESS DAYS &
CERTIFY IN 15 DAYS
Call OES within 2 Hrs
800-852-7550 and
Enter Data into CIWQS***
CATEGORY 1
NotificationEnter Data into
CIWQS***
No
Is Any Vol. of SSO reached
the Surface Water or MS4
System
CATEGORY 2
Is SSO greater than 1000 gallons
Not reached Surface Water
Enter Data into CIWQS***
CATEGORY 3- ALLOTHER
DISCHARGES –
Reporting Procedures
Inform Sewer Main/Lift Pump
Station Contractor
Stop SSO and notify appropriate
agency for clean-up and reporting
LA Co. investigates
No
CATEGORY 1
Is SSO greater or equal to
1,000 gallons
City FACILITY? City FACILITY?
No Yes
After-hours
Field Operations Emergency call list
Manager
Sewer Division receives SSO Calls
from the Public or SCADA System
Dispatch
City of Montebello
Sewer System Management Plan (SSMP) May 2025
11 2.3.5 City’s Contact Directory for SSO Responding and Reporting After Hrs. or
Responsible Party’s
Name Telephone After Hours or
Cell Phone
LA County Sewer
Maintenance Dept.
1-800-675-4357 1-800-675-4357
City Manager Raul Alvarez 1-323-887-1367
Director of Public
Works
Cesar Roldan 1-323-887-1462
City Engineer 1-323-887-1460
Building Inspector 1-323-887-1497
Public Works Services
Street Maintenance
Juan Hernandez 1-323-887-4613
Code Enforcement 1-323-887-1490
City 24-HOUR
Dispatcher
1-323-246-0214 1-323-246-0214
Police Department 1-323-887-1313 911
Fire Department 1-323-887-4510
LA County Health
Dept.
1-626-430-5420 1-213-974-1234
LA County FL Control
Dist.
1-626-458-4357
LA Co. Sanitation Dist. 1-562-699-7411
RWQCB (LA) 1-213-576-6657 1-213-305-2284
FX 1-213-620-6140
State O.E.S 1-800-852-7550
SMD Superintendent James Pryor 1-323-640-8500
SMD Supervisor Frank Arellano or
Jim Vives
1-626-201-9627
1-626-589-4455
City of Montebello
Sewer System Management Plan (SSMP) May 2025
12 3.0 LEGAL AUTHORITY
The SSSWDR Section D.13.(iii) requires that the City show through its existing codes, ordinances, service agreements or other legally binding procedures that the City possesses the legal authority to:
1) Prevent illicit discharges into its sanitary sewer system (examples may include I/I, stormwater, chemical dumping, unauthorized debris and cut roots, etc.). 2) Require that sewers and connections be properly designed and constructed. 3) Ensure access for maintenance, inspection, or repairs for portions of the lateral owned or maintained by the City.
4) Limit the discharge of Fats, Oils, and Grease (FOG) and other debris that may cause blockages.
5) Enforce any violation of its sewer ordinances.
3.1 Legal Authority
The City’s legal authority to operate a sanitary sewer collection system is derived from its incorporation as a City and is contained within Municipal Code Chapter 15, Division 20 (California Plumbing Code), and Chapter 15.04 (California Building Code), which adopt by reference the 2009 Edition of the California Plumbing Code and Building Code.
City Ordinance Title 8, Section 36.030 prohibits the illicit discharges, dumping, and nonstorm water discharges into storm water drains. Any person causing an illicit discharge may be required to pay for the cost of clean-up and remediation. Title 8, Section 36.140 allows criminal penalties for any violation of the Sewer and Industrial Waste Ordinances.
Violations for an infraction can be convicted under City Ordinance 8.32.050.
3.1.1 Prevention of Illicit Discharges into the Sanitary Sewer System City Ordinance and codifications of the Municipal policy for Sanitary Sewer and Industrial Waste were adopted for implementing many of the required SSMP elements and plans.
The City adopted Ordinances 2347 and 2356 dated December 13, 2011 and February 26, 2014, which incorporate most provisions of the California Plumbing Code, as its plumbing code. The Chapter 15.20 of the City of Montebello Ordinance 2356 – California Plumbing Code, which regulates sanitary sewers and industrial waste in the City, as its Sanitary Sewer and Industrial Waste use Ordinance.
City of Montebello
Sewer System Management Plan (SSMP) May 2025
13 The City of Montebello Plumbing Code Chapter 12, Sections 04.270 and 04.280- prohibits the unauthorized discharge connection to any sanitary sewer collection system. The City Code, Chapter 5, Section 16.230 and Chapter 8, Section 12.030 and 36.140, prohibits the illegal dumping of offensive or damaging substances such as chemicals, debris, etc.
This program consists of sewer line cleaning and maintenance program, which includes closed circuit television (CCTV) and other mechanisms to detect I/I. The Annual Maintenance of Sewer System agreement is signed yearly for services including manhole inspection, CCTV of pipes, preventative pipe cleaning, as-needed pipe cleaning and sewer remediation. The City will consider adoption of new Ordnances similar to the LA County Title 20, Section 20.24.080, requires that property owners be responsible for maintenance of their house laterals, including the elimination of cracks, tree roots, and other debris.
The City has no responsibility for the maintenance or replacement of house laterals. These laws combined constitute the City’s legal authority to prevent illicit discharges into the sewer system.
3.1.2 Legal Authority to Require that Sewers and Connections be properly Designed and Constructed
The City has the responsibility for the review and approval of plans and specifications for the construction and dedication of sanitary sewers, house laterals and sewer-related appurtenances through the development processes of the Department of Public Works, Development Engineering Division. The Division ensures all construction within the public right-of-way complies with adopted codes, ordinances, and engineering standards.
The City Code Chapter 12, Sections 04.270 and 04.280 require a permit from the Public Works Department. The permit requires submission of design of new main-line sewers and sewer service laterals in the City that comply with Sewer Master Plan dated 2011, Sewer Design Criteria and Maintenance. The City will consider adoption of new Ordinance similar to the LA County Code Title 20, Section 20.32.350 of the Code requiring that the design of new house laterals also conform to the requirements of Part 3, Chapter
20.32 of the Code unless otherwise covered by the LA County Plumbing Code Title 28.
The LACO Code, Section 20.24.080, requires property owners to maintain their house laterals, including the elimination of cracks, tree roots, and other debris. A similar requirement is found in Section 101.3.2 of the LACO Plumbing Code Title 28.
The City staff is currently uses LA County Code Title 20, Section 20.32.420, for the construction of a collection sewer system to conform to all the requirements prescribed by Division 2, of the Code, the Standard Specifications for Public Works Construction (“Green Book”) and by the Special Provisions and Standard Plans, all on file in the office
City of Montebello
Sewer System Management Plan (SSMP) May 2025
14 of the City Director of Public Works. The inspection of new main-line sewers and pumping plants to ensure proper construction is covered under Section 20.30.590 of the LA County Code.
3.1.3 Legal Authority to Ensure Access for Maintenance, Inspection, or Repairs The City Code, Chapter 12, Section 02.280 gives the City the legal right to set requirements to allow unrestricted maintenance access to the public sewer collection system located in the easements. The access shall be secured through City’s enforcement of the requirement for legally recorded sewer easements around all public sewer appurtenances located in private properties. Sewer easements are detailed on the sewer construction plans and are thoroughly reviewed by the City for adequacy in size and accuracy of alignment during the plan check process. Plan checkers take special care to ensure that maintenance crews will have sufficient access for the movement of equipment and materials for both routine and emergency repair or construction work on the system.
3.1.4 The City to Limit the Discharge of FOG and other Debris that may cause Blockage
The City Code Chapter 8, Section 04.010 states that the "Health and Safety Code of the County of Los Angeles," the same being Title 11 of the Los Angeles County Code, and the "Public Health License Code of the County of Los Angeles," the same being Division 1 of Title 8 of the Los Angeles County Code, as those titles have been amended through and including March 23, 2005, are adopted as the health and safety code for the city.
The City by adopting the California Plumbing Code per Section 15.20.010 of the City Municipal Code and LA County Code, Title 20 to be adopted by the City, has the legal authority to satisfy this element of the WDR.
The LA County Plumbing Code - Title 28, which will be adopted by the City requires the installation of grease interceptors at restaurants and other food establishments that generate grease in the City. Section 20.36.400 of the LACO Code prohibits the discharge of FOG and other substances that may, among other things, clog, obstruct, fill, or necessitate frequent repairs, cleaning out or flushing of sewer facilities, in the Sewer System. The LA County Code, Section 20.36.560 gives the Director of Public Works the authority to require the installation of treatment facilities, including grease interceptors, at any facility that generates FOG in the amount that will damage or increase the maintenance costs of the sewer collection system. The Director of Public Works shall be authorized to enforce and administer all of the provisions for FOG.
City of Montebello
Sewer System Management Plan (SSMP) May 2025
15 3.1.5 City to Enforce any Violation of Sewer Ordinances The City will consider adoption of new Ordinance similar to the LA County Code, Section
20.24.090, which gives the Director of Public Works and the City Engineer the legal authority to inspect main-line sewers, interceptors etc., as often as he deems necessary, to ascertain whether such facilities are maintained and operated in accordance with the provisions of Division 2 of the LA County Code.
The City’s Director of Public Works is empowered to enforce all the requirements prescribed in Division 2 – Sanitary Sewers and Industrial Waste of the LA County Code and in accordance with Section 20.24.110 of the Code may delegate this authority. The LA County Code, Section 20.24.160 allows criminal penalties for any violations of the Sewer and Industrial Waste Ordinances. The Codes, standard plans, specifications and other material cited in this Chapter are filed at the Office of the City’s Director of Public Works.
Los Angeles County Public Health requires the report of sewer spills that reach a drainage system within 15 minutes of knowledge of the event. As a result, Los Angeles County Flood Control is notified and can provide support with information and access to County drainage facilities if necessary. The Sewer Maintenance Division allows for direct collaboration allowing for efficient management and resolution of spills and drainage issues.
4.0 OPERATION AND MAINTENANCE PROGRAM
The SSMP shall include those elements listed below that are appropriate and applicable to the Enrollee’s system:
1) Maintain an up-to-date map of the sanitary sewer system, showing all gravity line segments and manholes, pumping facilities, pressure pipes and valves, and applicable stormwater conveyance facilities;
2) Describe routine preventive operation and maintenance activities by staff and contractors, including a system for scheduling regular maintenance and cleaning of the sanitary sewer system with more frequent cleaning and maintenance targeted at known problem areas. The Preventative Maintenance (PM) program should have a system to document scheduled and conducted activities, such as work orders;
3) Develop a rehabilitation and replacement plan to identify and prioritize system deficiencies and implement short-term and long-term rehabilitation actions to address each deficiency. The program should include regular visual and TV
City of Montebello
Sewer System Management Plan (SSMP) May 2025
16 inspections of manholes and sewer pipes, and a system for ranking the condition of sewer pipes and scheduling rehabilitation. Rehabilitation and replacement should focus on sewer pipes that are at risk of collapse or prone to more frequent blockages due to pipe defects. Finally, the rehabilitation and replacement plan should include a capital improvement plan that addresses proper management and protection of the infrastructure assets. The plan shall include a time schedule for implementing the short- and long-term plans plus a schedule for developing the funds needed for the capital improvement plan;
4) Provide training on a regular basis for staff in sanitary sewer system operations and maintenance, and require contractors to be appropriately trained; and 5) Provide equipment and replacement part inventories, including identification of critical replacement parts.
4.1 City Sewer Mapping System
The City maintains as-built plans of the Collection System CADD (Computer-Aided Design and Drafting) Maps which includes road names, property lines, Right-of-Ways, etc.
Information generated by the CADD is printed on Index Map Sheets stored by the City Public Works Department Engineering Division. The Index Maps are also kept at the City Public Works Department Field Maintenance Yards. The maps are updated, as necessary, to reflect any changes in the system. The county provides access to up-to-date maps of the sewer system which include pipe and manhole locations, diameter, material and flow direction via interactive GIS mapping on:
https://dpw.lacounty.gov/smd/sewernetwork/
4.2 Preventive Operation and Maintenance Program
The City contracted Los Angeles County to provide Sewer Maintenance including: yearly visual inspection of 2,000 manholes, CCTV inspection of pipes (20% of system based on a 5-year cycle), Preventative Pipe cleaning (20% of system based on 5-yr cycle), AsNeeded pipe cleaning ($100,000 budget), Sewer Remediation (Point Repair budget $105,000) and Sewer Remediation (Pipe Lining Budget $160,000). The Operation and Maintenance Program has been developed in conjunction with the contract through Los Angeles County to provide the tools and procedures for maintaining its gravity sewer system with adequately trained staff and sewer contractors possessing adequate knowledge, skills, and abilities. The goal of the Operation and Maintenance Program is to operate an efficient sanitary sewer system at an optimal level to eliminate sanitary
City of Montebello
Sewer System Management Plan (SSMP) May 2025
17 sewer overflows and thereby protect public health and the environment. The maintenance contract provides after-hour services to the City such as Stand-by, callback, and other sewer emergency services.
Funds are managed and administered by the City to sustain the maintenance programs by contracting with LA County, the City is committed to a regular sanitary sewer maintenance program in order to reduce and prevent SSOs and to extend the useful life of the system including routine maintenance and cleaning of wastewater facilities and pipelines as addressed on the following sections.
4.2.1 Sewer Line and Manhole Inspection
The interior and exterior of manholes are inspected bi-annually for any structural defects, sewage flow condition, presence of vermin or rodents, deleterious industrial waste, odors and any signs of unusual settlement around the manholes and along sewer alignments.
4.2.2 Gas Trap Manholes and Siphons
On a monthly basis, these facilities are inspected and cleared of any stoppages or flow restrictions.
4.2.3 Drop Manholes
These facilities are inspected and cleared of stoppages and flow restrictions on variable frequencies based on prior inspection records.
4.2.4 Sewer Line Cleaning
Sewer lines are cleaned by hydro jet or rodding. The Sewer Maintenance Division contract states that 20% of the system is inspected and cleaned based on a 5-yr cycle based on inspection records. Sewer lines known to accumulate grease, garbage grinds or sand are put on monthly, quarterly, or semi-annual cleaning schedule and those prone to root growth are periodically rodded or chemically treated.
4.2.5 Vermin and Rodent Control
Sewers infested by insects are chemically treated. Those infested by rodents are baited.
4.2.6 Work Scheduling
The Sewer Maintenance Division is in the process of implementing Cityworks Maintenance Management system to schedule and track maintenance activities. The activities field crew performs are recorded in various forms such as service requests, cleaning reports,
City of Montebello
Sewer System Management Plan (SSMP) May 2025
18 sewer maintenance daily reports, manhole adjustments, overflow report forms, etc., and stored in the system.
4.3 Rehabilitation and Replacement Plan
The City’s rehabilitation and replacement plan is based on the 2011 Sewer System Hydraulic Analysis prepared by Infrastructure Engineering Corporation (IEC). The analysis presents wastewater flow projections at the existing lines for 5-year time intervals. These projections were used to identify system deficiencies and to develop a Capital Improvement Plan (CIP) that outlined a strategy to mitigate them. The City’s 2011 Sewer System Master Plan was also completed by IEC and built on the 2009 analysis by updating the existing wastewater flows and recommended system capital improvements. These updates were done considering the critical findings of the 2011 Sewer Closed Circuit Television (CCTV) and Condition Assessment Report and the 2009 Sewer Flow Monitoring Report, both completed by IEC. The 2009 Sewer Closed Circuit Television (CCTV) and Condition Assessment Report presented the results of televising gravity mains with missing hydraulic information, areas known to have fats, oils, and grease (FOG) problems, and those areas identified as deficient in the 2009 analysis.
4.3.1 Capital Improvement Programs
The primary goal of the Capital Improvement Program (CIP) is to provide the City of Montebello with a long range-planning tool for implementing its sewer infrastructure improvements in an orderly manner and providing a basis for financing these improvements. To accomplish this goal, the program is phased based upon the implementation cost of the facilities, the quantity of work the City can reasonably administer each year, and the funds available for these projects. The capital improvements needed will be identified as a result of the assessment of the system through capacity analyses and physical TV inspections.
Updating the Capital Improvement Program if recommended as the CCTV video from Sewer Maintenance District would be utilized and the remainder of the City sewers would be videoed and rated. The capital improvement projects would be selected primarily with consideration of the health and safety of the public and protection of the environment by minimizing the possibility of spillages. The highest priority would be assigned to the projects that will help alleviate known maintenance problems and line segments that have been shown through CCTV to be structurally deficient. The second highest priority has been assigned to projects identified by hydraulic evaluations and modeling with existing capacity deficiencies. The third priority would be replacement of aged pipelines.
Pending the completion of the videoing of the sewers, the initially recommended CIP has
City of Montebello
Sewer System Management Plan (SSMP) May 2025
19 been based upon the best information currently available. The CIP should be updated as new information becomes available from sources such as CCTV inspections and from maintenance crew observations. The CIP should also be updated based on any major change in the City’s General Plan. The project priorities may be adjusted to take advantage of concurrent construction such as street paving projects or adjacent infrastructure work.
4.3.2 Condition Assessment Program
There are currently about 89.4 miles of sewer lines within the City. The existing City collection sewer facilities are listed in Appendix D. The existing sewer pipes, ranging from 8 to 18 inches in diameter, are predominantly of vitrified clay pipe material. Naturally, these sewer lines age and structural problems such as cracks, joint separation, root intrusion, etc. will develop. To ensure that these problems are properly mitigated, the WDR requires that the City has a program in place to minimize and correct them in conjunction with the Sewer Maintenance District’s annual contract.
The City does not currently charge a monthly user fee to customers. This is a topic of discussion for the City Council as the system ages.
4.3.3 Equipment Maintenance and Replacement Policy
The equipment utilized in the maintenance of the City’s sewer facilities is owned by the Sewer Maintenance District. The Maintenance District has full responsibility for the maintenance, replacement and liability of the equipment.
4.4 Training for Field Operations Personnel and Contractors The City recognizes the importance of consistent staff training and documentation of training sessions. The City’s wastewater staff are trained on wastewater operations and maintenance policies, procedures, safety policies, and equipment. The Director of Public Works is responsible for documenting the details of each training event including dates, content, and participating employees.
All personnel needed for the operation and maintenance of the City’s sewer system will be provided by the City contractor. The training of City personnel is a function of the City Public Works Department.
The City’s sewer construction projects are awarded to carefully selected contractors with well trained and qualified personnel for any given project. The designed plans and specifications for City’s sewer construction projects contain detailed instructions on City’s permitting requirements, standards and policies that must be adhered to by contractors
City of Montebello
Sewer System Management Plan (SSMP) May 2025
20 doing work within the City.
Additional training requirements on the City’s Sanitary Sewer Overflow Emergency Response Plan (SSOERP) are described in Section 6.1.7 “Training”
5.0 DESIGN AND PERFORMANCE PROVISION
The City’s Design and Performance Provisions address those mandatory SSMP provisions outlined in the SSSWDR Section D.13.(v):
1) Design and construction standards and specifications for the installation of new sanitary sewer systems, pump stations and other appurtenances; and for the rehabilitation and repair of existing sanitary sewer systems; and 2) Procedures and standards for inspecting and testing the installation of new sewers, pumps and other appurtenances and for rehabilitation and repair projects.
5.1 Design and Construction Standards and Specifications The City requires that all sewers be designed in accordance with Los Angeles County standards. The LA County DPW has Standard Plans and Specifications for Construction of Sanitary Sewers and appurtenances to ensure that sewer lines and connections are properly designed and constructed. The County DPW specifications by reference incorporate the Standard Plans and Specifications for Public Works Construction (Green Book), Special Provisions, and Standard Drawings. In addition, Los Angeles County DPW has other publications such as the Private Contract Sanitary Sewer Procedural Manual, Guidelines for the Design of Pump Stations, etc. to ensure consistency in the design of collection systems within unincorporated County areas. The City requires that these publications also be followed in the design of sewer system within the City.
5.2 Procedures and Standards for inspection and Testing New and Rehabilitated Collection Sewer Facilities.
The City has established procedures for inspection and testing of new sanitary sewer systems and repair and rehabilitation projects, including gravity sewers, force mains, pipeline and manhole repair and rehabilitation as described on City of Montebello Sewer Master Plan dated 2011.
Inspection, testing and acceptance, criteria for sanitary sewers, force mains, manholes and lateral connections are specified in the LA County Design Guidelines, Policies Standards and Procedures and in the “Green Book”, as described above. The documents include requirements for submitting record drawings and photographic documentation of