City of Montebello
Sewer System Management Plan (SSMP) May 2025
21 construction; cleaning requirements; testing of sewer lines and manholes; postinstallation video inspection; soils testing; inspection of structure excavations; and backfill compaction testing. The project-specific Contract Drawings and Special Provisions include additional testing requirements, as applicable.
The City provides inspection by utilizing its own staff or outsourcing to qualified consultant for the inspection of new sewer construction and rehabilitation projects. City requires that “As-Built” sewer plans of the completed projects be submitted prior to final approval for acceptance of sewer facilities for public use. In compliance with City policy, the City also requires that all newly constructed sanitary sewer lines be inspected by experienced City staff or qualified consultant prior to acceptance of the project for City maintenance.
6.0 OVERFLOW EMERGENCY RESPONSE PLAN
The City has developed and implemented a Sanitary Sewer Overflow Emergency Response Plan (SSOERP) that identifies measures to protect public health and the environment, as required by SSSWDR Section D.13.(vi) by including:
1) Proper notification procedures so that the primary responders and regulatory agencies are informed of all SSOs in a timely manner;
2) A program to ensure an appropriate response to all overflows; 3) Procedures to ensure prompt notification to appropriate regulatory agencies and other potentially affected entities (e.g. health agencies, Regional Water Boards, water suppliers, etc.) of all SSOs that potentially affect public health or reach the waters of the State in accordance with the MRP. All SSOs shall be reported in accordance with this MRP, the California Water Code, other State Law, and other applicable Regional Water Board WDRs or NPDES permit requirements. The SSMP should identify the officials who will receive immediate notification; 4) Procedures to ensure that appropriate staff and contractor personnel are aware of and follow the Emergency Response Plan and are appropriately trained; 5) Procedures to address emergency operations, such as traffic and crowd control and other necessary response activities; and
6) A program to ensure that all reasonable steps are taken to contain and prevent the discharge of untreated and partially treated wastewater to waters of the United States and to minimize or correct any adverse impact on the environment resulting from the SSOs, including such accelerated or additional monitoring as may be
City of Montebello
Sewer System Management Plan (SSMP) May 2025
22 necessary to determine the nature and impact of the discharge.
6.1 Overflow Response Procedure
Goals with respect to responding to SSOs are as follows:
• Notify the Sewer Maintenance District of the Overflow • Minimize the volume and damage from the SSO by responding promptly when notified;
• Contain and prevent the overflow from entering the storm drain system; • Minimize public contact with the spilled wastewater;
• Stop the overflow as soon as possible.
• Completely recover the overflow and return it to the sewer system. • Clean up the area contaminated by the overflow.
• Meet the regulatory reporting requirements;
• Compile information and conduct an investigation to determine the probable cause of the overflow.
• Document the events, including taking photographs, during the overflow and response activities
• Notify the public when a threat to public health exists.
The City is responsible for reporting sanitary sewer overflows on CIQWS within the City.
The Sanitary Sewer Overflow Procedure described in Chapter 6 of the SMMP are utilized by the City. Furthermore, the City 24-hour emergency phone number 1-323-246-0214 is readily available to City staff and residents to use in promptly notifying City Public Works Department staff of SSO events in the City.
The City’s SSOERP complies with the additional notification requirements outlined in SWRCB Order WQ 2008-0002-EXEC, Adopting Amended Monitoring and Reporting Requirements for Statewide General Waste Discharge Requirements for Sanitary Sewer Systems, including:
1) For any discharges of sewage that results in a discharge to a drainage channel or a surface water, the Discharger shall, as soon as possible, but not later than two (2) hours after becoming aware of the discharge, notify the State Office of Emergency Services, the local CITY OF Montebello, CITY SEWER SYSTEM MANAGEMENT PLAN health officer or directors of environmental health with jurisdiction over affected water bodies, and the appropriate Regional Water Quality Control Board.
2) As soon as possible, but no later than two (2) hours after becoming aware of a discharge to a drainage channel or a surface water, the Discharger shall submit to
City of Montebello
Sewer System Management Plan (SSMP) May 2025
23 the appropriate Regional Water Quality Control Board a certification that the State Office of Emergency Services and the local health officer or directors of environmental health with jurisdiction over the affected water bodies have been notified of the discharge.
6.1.1 Regulatory Agencies Notification and Time Frame
The City is responsible for reporting of SSOs’ to appropriate regulatory agencies for the City. The City’s Sanitary Sewer Overflow Emergency Response Plan (SSOERP) is provided as Appendix A, along with supporting attachments. It should be noted that the SSOERP incorporates the new monitoring and reporting requirements in Order 2013-0058-EXEC.
6.1.1 b Agencies Telephone/Fax Numbers
Agency Contacts Hours of Operation
County Health Department (213) 974-1234 Answered on a 24-hour 7-day basis
State Office of Emergency Services 1-800-852-7550 Answered on a 24-hour, 7-day basis
Los Angeles Regional Water (213) 576-6600 Answered only during Quality Control Board (213) 576-6650 normal working hours Flood Maintenance Division East (626) 445-7630 Answered only during Area (626) 798-6761 normal working hours
South area (562) 861-0316 Answered only during
normal working hours
West area (818) 896-0594 Answered only during
2 working hours (818) 248-3842 normal working hours
State Water Resource Control www.waterboards.ca.gov/ciwqs Board
6.1.2 Emergency Response Plan Procedure
City of Montebello
Sewer System Management Plan (SSMP) May 2025
24 Notification, Investigation and Mobilization have been developed by the City as following:
Calls for SSOs can be received by Police Dispatch, Code enforcement or the City Public Works Department. The City has 24-hour call service via Public Works Department dispatch and regular hour dispatch from the Engineering Division and Code Enforcement.
Action following notification of an overflow:
• When a call is received reporting a sewer overflow during normal business hours (Monday thru Thursday), the Superintendent is notified who subsequently dispatches field personnel or sewer maintenance contractor to respond and investigate.
• When a call is received after hours, weekends or holidays, Police Dispatch or 24- Hour dispatch will contact the on-call Standby personnel and/or sewer maintenance contractor who will respond and investigate. • If it is determined that the overflow is in the City’s sewer system, then mobilization will begin. If the overflow is the County Sanitation District’s (LACSD) or adjacent City’s sewer system, then they shall be contacted immediately.
The overflow response in the field will be directed by the Sewer Maintenance District or supervisor and/or staff who are trained and experienced in responding to overflows. • A crew will be dispatched to the scene to begin the response actions. i. Staff members will begin containment of spill to prevent overflow from entering the storm drain system.
ii. Sewer maintenance contract staff will be informed to start corrective action immediately, if required.
iii. Staff/Contract operators will begin corrective action to eliminate the cause of the overflow.
iv. Upon containment and corrective action, recovery and clean-up will commence.
v. Notification and reporting.
Containment and recovery should occur as close as practical to the location of the overflow with attention to blocking off any storm water catch basins to prevent sewage from entering the storm drain system. If sewage has entered the storm drain system, containment and recovery will take place downstream of the entry point where it is
City of Montebello
Sewer System Management Plan (SSMP) May 2025
25 accessible and safe to work. Containment will be performed by installing Sandbags, containment berms and covers, absorbent pads or plugs will be deployed to dam up the overflowing sewage to prevent the movement of the sewage from traveling further or prevent entry into the storm drain system. Vacuum trucks will be used to collect the overflow sewage and return it to the sewer system.
Corrective Action will be taken in place upon arriving to the overflow location. Public Access to the immediate area of the overflow is restricted to minimize potential impacts to public health by redirecting pedestrian and automobile traffic away from the overflow through the use of traffic cones, plastic tape, barricades, or local law enforcement.
The extent of the overflow and its potential impacts to the public health are assessed by personnel. This process involves determining if any private property owners/residents may be exposed to raw sewage, making direct contact with private property owners/residents who have been or may be directly affected by the overflow, advising private property owners/residents of the potential health hazards associated with contact with raw sewage, and identifying prudent measures to be taken by private property owners/residents.
Simultaneous efforts include determining the path and final destination of the sewage spill and potential exposure to the public. If wastewater from the overflow is ponding in a location that can be isolated, then personnel will set up barricades to prevent public access. Traffic control is set up to prevent vehicles from entering locations where the overflow has contaminated public or private streets. Personnel are instructed to direct pedestrians and automobile traffic away from the path and final destination of the overflow. Cooperation with local law enforcement and public works officials is a key component to ensure that public exposure to the overflow is minimized and to ensure spill site security.
When possible, personnel will contain and recover the overflow in the immediate vicinity of the overflow before it enters a storm drain or catch basin. Measures to affect such containment include damming the overflow path with sandbags in the street gutter and recovering the impounded water with a vacuum truck or sewer cleaning jet Vactor truck, or using sandbags to divert the overflow back into a nearby sewer manhole.
Personnel can also use plugs in the storm drainpipe or catch basin further downstream to prevent the flow of sewage into the storm drain system. A Vactor truck will be used to collect the wastewater and return to the sanitary sewer system.
The cause of the overflow will be investigated, and the necessary corrective action will
City of Montebello
Sewer System Management Plan (SSMP) May 2025
26 be taken to stop the overflow and/or correct the condition that caused the overflow if the overflow has already stopped.
Corrective actions to stop a sewer overflow include as following:
• Clearing a pipe blockage with a jet Vactor or rodding machine, • Removing debris from a manhole,
• Upstream flow diversion, and
• Bypassing of wastewater around the blockage using vacuum trucks or pumps.
Cleaning up shall be performed after the overflow has been stopped. All locally impounded wastewater is recovered with a vacuum truck and returned to the sanitary sewer system. All visible debris of wastewater origin from the overflow location(s), street(s), curb and gutters, and the overflow runoff path is physically removed. Overflow location(s), street(s), curb and gutters, and the runoff path are flushed with potable water, typically delivered by a vacuum truck or water truck. The flush water is also recovered and returned to the sewer system. All sandbags and other containment equipment are removed to complete the cleanup in the storm drain system.
If spilled wastewater reaches natural watercourses or other areas accessible to the public, input is solicited from the responsible jurisdiction regarding additional measures which may be necessary or appropriate for a complete cleanup. Additional cleanup measures are completed as directed.
Private properties impacted by overflows or backups from problems within the City’s system are cleaned up by a professional restoration company dispatched by the property owner. Claims for property damage are submitted to the City Clerk’s office and handled by the City’s Insurance and Claims Coordinator.
City of Montebello
Sewer System Management Plan (SSMP) May 2025
27 6.1.3 Summary of MRP Requirements
CATEGORIES DEFINITIONS [see Section A on page 5 of Order 2006-0003-DWQ, for Sanitary
Sewer Overflow (SSO) definition]
CATEGORY 1 Discharges of untreated or partially treated wastewater of any volume resulting from an enrollee’s sanitary sewer system failure or flow condition that:
• Reach surface water and/or reach a drainage channel tributary to a surface water; or
• Reach a Municipal Separate Storm Sewer System (MS4) and are not fully captured and returned to the sanitary sewer system or not otherwise captured and disposed of properly. Any volume of wastewater not recovered from the MS4 is considered to have reached surface water unless the storm drain system discharges to a dedicated storm water or groundwater infiltration basin (e.g., infiltration pit, percolation pond).
Discharges of untreated or partially treated wastewater resulting from blockages or other problems within a privately owned sewer lateral connected to the enrollee’s sanitary sewer system or from other private sewer assets. PLSDs that the enrollee becomes aware of may be voluntarily reported to the California Integrated Water Quality System (CIWQS) Online SSO Database.
All other discharges of untreated or partially treated wastewater resulting from an enrollee’s sanitary sewer system failure or flow condition.
Discharges of untreated or partially treated wastewater of 1,000 gallons or greater resulting from an enrollee’s sanitary sewer system failure or flow condition that do not reach surface water, a drainage channel, or a MS4 unless the entire SSO discharged to the storm drain system is fully recovered and disposed of properly.
City of Montebello
Sewer System Management Plan (SSMP) May 2025
28 Notification and Reporting is required to the Los Angeles County Department of Public Health for a spill of any size and California Office of Emergency Services (Cal OES) for spills greater than or equal to 1,000 gallons that reaches surface water. Cal OES will notify the Regional Water Quality Control Board. The City’s document, Sewage Spill Reporting Procedure as shown on Section 2.3. contains detailed notification and reporting procedures for different categories of overflows and all of the appropriate contacts for reporting. All pertinent SSO information listed below is documented on SSO Field Incident location Map (Appendix I). In accordance with regulatory requirements, telephone notification should be made as soon as possible without substantially impeding response activities and within 2 hours of the incident occurrence. The following information shall be provided, if available, when reporting an overflow by telephone:
a) Name of person notifying and direct return phone number. b) Name of SSO agency.
c) Location of overflow.
d) Whether the overflow has entered or will enter surface waters (rivers, lakes, storm drains, or ocean) and name of surface water.
e) Date and time overflow began and ended (use start time determination worksheet- Appendix K).
f) Whether the spill is contained.
g) Estimated SSO Volume discharged (gallons). (Volume estimation worksheets – Appendix K)
h) If ongoing, estimated discharge rate (gallons per minute). i) Cause of overflow.
j) Corrective actions taken.
k) Estimated time of repair.
l) Agencies involved in repair and clean-up.
All overflows, regardless of quantity, which reaches receiving waters, impact groundwater, or endangers public health or the environment, require immediate telephone notification to the Los Angeles County Department of Public Health. The Department of Public Health is responsible for beach postings and closures and other forms of public notification deemed necessary to protect public health.
Greater than or equal to 50,000 gallons that reach surface water requires water quality sampling in accordance with the Water Quality Monitoring Program.
Electronic notification and reporting must be submitted to the California Integrated Water Quality System (CWIQS) Online database within the following time period:
City of Montebello
Sewer System Management Plan (SSMP) May 2025
29 6.1.4 Spill Notification, Reporting, Record Keeping and Time Period (Order WQ 2013-0058-EXEC)
CATEGORIES DEFINITIONS [see Section A on page 5 of Order 2006-0003-DWQ, for Sanitary Sewer Overflow (SSO) definition]
CATEGORY 1 Discharges of untreated or partially treated wastewater of any volume resulting from an enrollee’s sanitary sewer system failure or flow condition that:
• Reach surface water and/or reach a drainage channel tributary to a surface water; or
• Reach a Municipal Separate Storm Sewer System (MS4) and are not fully captured and returned to the sanitary sewer system or not otherwise captured and disposed of properly. Any volume of wastewater not recovered from the MS4 is considered to have reached surface water unless the storm drain system discharges to a dedicated storm water or groundwater infiltration basin (e.g., infiltration pit, percolation pond).
CATEGORY 2 Discharges of untreated or partially treated wastewater of 1,000 gallons or greater resulting from an enrollee’s sanitary sewer system failure or flow condition that do not reach surface water, a drainage channel, or a MS4 unless the entire SSO discharged to the storm drain system is fully recovered and disposed of properly.
CATEGORY 3 All other discharges of untreated or partially treated wastewater resulting from an enrollee’s sanitary sewer system failure or flow condition.
PRIVATE LATERAL
SEWAGE
DISCHARGE (PLSD)
Discharges of untreated or partially treated wastewater resulting from blockages or other problems within a privately owned sewer lateral connected to the enrollee’s sanitary sewer system or from other private sewer assets. PLSDs that the enrollee becomes aware of may be voluntarily reported to the California Integrated Water Quality System (CIWQS) Online SSO Database.
ELEMENT REQUIREMENT METHOD
NOTIFICATION
(see section B of
MRP)
• Within two hours of becoming aware of any
Category 1 SSO greater than or equal to
1,000 gallons discharged to surface water or
spilled in a location where it probably will be
discharged to surface water, notify the
California Office of Emergency Services (Cal
OES) and obtain a notification control number.
Call Cal OES at:
(800) 852-7550
REPORTING
(see section C of
MRP)
• Category 1 SSO: Submit draft report within three
business days of becoming aware of the SSO and
certify within 15 calendar days of SSO end date.
• Category 2 SSO: Submit draft report within 3
business days of becoming aware of the SSO and
certify within 15 calendar days of the SSO end
date.
Enter data into the CIWQS Online
SSO Database
(http://ciwqs.waterboards.ca.gov/),
certified by enrollee’s Legally
Responsible Official(s).
• Category 3 SSO: Submit certified report within
30 calendar days of the end of month in which
SSO the occurred.
City of Montebello
Sewer System Management Plan (SSMP) May 2025
30 • SSO Technical Report: Submit within 45
calendar days after the end date of any Category
1 SSO in which 50,000 gallons or greater are
spilled to surface waters.
• “No Spill” Certification: Certify that no SSOs
occurred within 30 calendar days of the end of the
month or, if reporting quarterly, the quarter in
which no SSOs occurred.
• Collection System Questionnaire: Update and
certify every 12 months.
WATER
QUALITY
MONITORING
(see section D of
MRP)
• Conduct water quality sampling within 48 hours
after initial SSO notification for Category 1 SSOs
in which 50,000 gallons or greater are spilled to
surface waters.
Water quality results are required
to be uploaded into CIWQS for
Category 1 SSOs in which 50,000
gallons or greater are spilled to
surface waters.
RECORD
KEEPING
(see section E of
MRP)
• SSO event records.
• Records documenting Sanitary Sewer
Management Plan (SSMP) implementation and
changes/updates to the SSMP.
Self-maintained records shall be
available during inspections or
upon request.
• Records to document Water Quality Monitoring
for SSOs of 50,000 gallons or greater spilled to
surface waters.
• Collection system telemetry records if relied upon
to document and/or estimate SSO Volume.
Category 1 or 2 SSO, a draft report must be submitted within three (3) business days of becoming aware of the SSO and certify within 15 calendar days of the SSO end date.
Category 3 SSO, a certified report must be submitted within 30 calendar days of the end of the month in which the SSO occurred.
For Category 1 spills 50,000 gallons or greater which have reached surface water, a technical report must be submitted within 45 calendar days after the SSO end date. Water quality sampling is also required within 48 hours after the initial SSO notification.
City of Montebello
Sewer System Management Plan (SSMP) May 2025
31 6.1.5 Post Clean Up Activities
Once cleanup of an overflow is complete, the incident must be reviewed and any appropriate measures to prevent recurrence must be implemented. Follow-up CCTV inspection is performed when an overflow was caused by a blockage to verify complete removal of the material causing blockage. If the overflow was avoidable by preventative maintenance, then maintenance activities are added or adjusted as necessary. An example is to increase the frequency of line cleaning where heavy grease build-up has caused an overflow to occur, while source control efforts are reviewed. If the overflow was caused by factors generally outside the City’s control, such as vandalism, steps are still taken to minimize recurrence such as strengthening security by locking down manhole covers, increasing area surveillance, and requesting neighborhood assistance in reporting vandalism.
Regardless of the size or type of overflow, all overflows are investigated thoroughly.
Following the investigation, information shall be documented on the SSO Field Incident Report and After Action Report.
6.1.6 Emergency Response and Personnel
The City has the necessary personnel to respond to almost any emergency, including sewer blockage, pipe failure, and vandalism. The urgency and seriousness of any wastewater overflow results in the full commitment and availability of all staff in the Sewerage System Section to respond. Additional City personnel are utilized for specialized assistance as needed. Contractors with emergency response capabilities are also used to assist in emergencies as needed. Each sewer lift station has a specific Emergency Response Plan which is kept at the facilities for personnel.
An emergency contact list is maintained which includes the home phone number of all employees in the Sewerage System Section. All supervisors and managers in the Sewerage System Section are assigned cell phones and are accessible 24-hours a day. A table of organization for the Sewerage System Section is shown on Sections 2.3.1a and
2.3.5 of this SSMP. Emergency Equipment, in addition to the normal compliment of equipment utilized by the Division for maintenance and repair of the sewerage system, specific items are maintained for use during emergency conditions. Such equipment includes:
• High pressure jetting machines to clear pipe blockages. • Portable engine driven electrical generators for use at pumping plants during power outages.
City of Montebello
Sewer System Management Plan (SSMP) May 2025
32 • Vacuum tankers to transport flow around blockages or to remove wastewater from a containment location in a street or storm drain.
• Pre-filled sandbags, flat bed and crane trucks for use in establishing containment dams.
• Front loaders for emergency earth moving operations.
• Portable engine driven centrifugal pumps (trash pumps) to bypass wastewater around pipe blockages and remove wastewater from storm drain channel containment locations.
• Hoses and lightweight quick-coupling piping in various sizes for use in bypass pumping.
• Pipe repair clamps, inflatable sewer plugs, and other miscellaneous pipe repair parts.
• Water trucks for use in cleanup operations.
• Portable lights, air compressors, centrifugal blowers, and other miscellaneous equipment.
6.1.7 Training
Training of Sewage System Section personnel is completed annually (more frequently if needed) with both classroom training and field exercises to simulate a spill. Written exercises are utilized during training to ensure that staff is competent in spill response; volume estimation; notification and reporting; containment and clean-up; and proper completion of required SSO forms.
Lastly, on-the-job training is administered to subordinate staff, by experienced supervisors and lead workers, during and following actual overflow events to further reinforce the annual training and to analyze event specific issues.
6.1.8 Records Retention
All formal reports, photographs, hand calculations of volume estimations, hand-written notes and any other documentation relating to SSOs shall be kept for a period of at least five years. All original documents shall be kept in the office of the Engineering Office,
City of Montebello
Sewer System Management Plan (SSMP) May 2025
33 with copies scanned and saved on the City computer server for archival purposes.
7.0 FOG CONTROL PROGRAM
The City’s Fats, Oils and Grease Control Program addresses the mandatory SSMP provisions outlined in the SSSWDR Section D, 13 (vii). The City’s FOG Control Program helps reduce the amount of fats, oils and grease discharged to the sanitary sewer system, by including:
1) An implementation plan and schedule for a public education outreach program that promotes proper disposal of FOG;
2) A plan and schedule for the disposal of FOG generated within the sanitary sewer system service area. This may include a list of acceptable disposal facilities and/or additional facilities needed to adequately dispose of FOG generated within a sanitary sewer system service area;
3) The legal authority to prohibit discharges to the system and identify measures to prevent SSO’s and blockages caused by FOG;
4) Requirements to install grease removal devices (such as traps or interceptors), design standards for the removal devices, maintenance requirements, BMP requirements, record keeping and reporting requirements; 5) Authority to inspect grease producing facilities, enforcement authorities, and whether the Enrollee has sufficient staff to inspect and enforce the FOG ordinance; 6) An identification of sanitary sewer system sections subject to FOG blockages and establishment of a cleaning maintenance schedule for each section; and 7) Development and implementation of source control measures for all sources of FOG discharged to the sanitary sewer system for each section identified above.
7.1 Public Education Outreach Program
The outreach program for proper disposal of FOG and other SSO prevention measures such as the installation of backwater valves, house lateral maintenance, etc. is disseminated to City residents through publication of Annual Reports, brochures and individual notices to property owners.
City Public Works Department personnel assist in passing useful information on SSO
City of Montebello
Sewer System Management Plan (SSMP) May 2025
34 prevention and FOG on to home and business owners. To complement County efforts, the City will initiate its own Public Education Outreach Program. This will consist of including SSO and FOG related articles from County DPW and other sources in City newsletters and by maintaining continuous communication with the LA County, City residents and other stakeholders on these and other issues.
FOG inspections include an assessment of the grease control device (GCD) condition (if applicable), food and grease waste disposal practices, drain screen presence and condition, spill preparedness, and employee training. During the inspections, business owners are educated on the City’s FOG Control Program and the best management practices (BMPs) required for proper FOG disposal to prevent SSOs. Businesses receive a list of corrective actions following the inspection, and inspectors work with business owners until compliance is achieved. Enforcement actions are taken as necessary.
7.2 Disposal Methods for FOG Generated within the City’s Sanitary Sewer System
The City is committed to reducing the amount of FOG discharged to the sanitary sewer system through the implementation of an effective public outreach program. The City’s Department of Public Works Utility Division identifies all new food service locations within the City’s service area. FOG compliance inspections are annually conducted at selected food service and manufacturing establishments (FSE) as part of the City’s FOG Inspection Program. High priority facilities are routinely selected for inspection. These include FOGproducing facilities that are near known FOG hotspots and sites that failed to comply during the last inspection. Facilities that did not receive an inspection in the past fiscal year are also prioritized for inspection. It should be noted that some FOG inspections are conducted in conjunction with storm water compliance inspections.
A list of vendors which offer collection and disposal services within the City’s service area can be found at the CalFOG website (www.calfog.org). Food service establishments (FSEs) are annually inspected for FOG disposal compliance during FOG inspections.
Grease control devices (GCDs) are required to have a total grease and solids accumulation of less than 25% by volume in order to be in compliance.
7.3 The Legal Authority to Prohibit Discharges to the System and Identify Measures to Prevent SSOs and Blockages Caused by Fog
The legal authority to prohibit discharges of FOG into the sewer system is discussed in Chapter 3 of this document. Requirements for grease interceptors at food establishments to prevent the discharge of grease to the collection sewer system and educating the public on proper disposal methods for FOG are also discussed elsewhere in this chapter.
City of Montebello
Sewer System Management Plan (SSMP) May 2025
35 The City is currently in the process of creating a FOG Management Program. This Program will be written with the adoption of refinement of the Ordinance 8.04.010 similar to the LA County Public Health and Safety Code, Title 11 as currently in effect and as amended through Los Angeles County Ordinance No. 97-0071, and portions of Title 8, Consumer Protection, as contained in Los Angeles County Ordinance No. 97-0071. These ordinances and codes are the health and safety ordinance of the City of Montebello, protecting and preserving the public health, safety and welfare by the enactment, inspection and enforcement of the health regulations therein contained and providing penalties for the violations FOG.
7.4 Requirement to Install Grease Removal Devices, Design Standards for Grease Removal Devices, Maintenance Requirements, BMP Requirements; Record Keeping and Reporting Requirements
The City is responsible to enforce Sanitary Sewers and Industrial Waste Programs in the City.
The Industrial Waste Program of the County is managed by the Environmental Programs Division of County DPW. The design standards for grease removal devices and all the requirements imposed on industrial waste facilities that discharge waste or FOG into the City’s sewer system are similar to those imposed in the Unincorporated County and as presented in portions of Title 8 of LA County Public Health and Safety Code.
DPW does not issue permits or inspect domestic sewage disposal to the sanitary sewer system. However, the LACO Code prohibits the discharge of “any material, which may create a public nuisance, or menace to the public health or safety, or which may pollute underground or surface waters, or which may cause damage to any storm-drain channel or public or private property” as noted in Section 20.36.010. If during inspection by LACPW, the Districts’ personnel determines that a FOG-related problem exists and is traceable to a domestic sewage source of such character that is not satisfactory, under LACO Code 20.20.100, pretreatment could be required or the discharge required to be eliminated. Domestic waste containing FOG can lead to spills, which are public nuisances and violation of California Health and Safety Code Division 5, Part 3, Chapter 6, Article 2, which can also be used to impose appropriate domestic sewage discharge requirements.
FSE’s are required to size, design and construct grease traps and inceptors according to the LACO Plumbing Code. Additionally, they are required to be approved, installed, and operated in a manner to control discharges of FOG into the sanitary sewer system and to ensure that the facilities do not create nuisances, menaces to public peace, health or
City of Montebello
Sewer System Management Plan (SSMP) May 2025
36 safety hazards, or adverse impacts to the public sewage system, soil, underground, and/or surface waters.
The Industrial Waste online page on the County’s website provides standard drawings for grease pretreatment devices:
https://cleanla.lacounty.gov/industrial-waste/#Obtaining-Clearance The IWDP Conditions and Limitations have a minimum maintenance frequency condition and a requirement to maintain the GRD in proper working order. During inspections, inspectors physically examine the GRD. If a grease interceptor (GI) is used, FSEs are required to open and inspect it. If issues are identified, they are documented, and a job order is created. The FSE signs off on the order and receives a receipt. If cleaning records are not provided, or if the GI cannot be accessed, the FSE must clean it.
Permit conditions require:
• GIs to be cleaned at least once every three months
• FSEs with grease traps are required to perform daily maintenance The Pretreatment Guidelines for Restaurants and Food Service Operations provide guidelines and best management practices for selecting and installing pretreatment devices. These guidelines outline the installation requirements for grease interceptors and offer a list of alternative pretreatment devices that can be used in lieu of a grease interceptor.
During inspections, inspectors verify whether best management practices are being followed, such as maintaining proper documentation, using adequate devices, and employing appropriate disposal methods. In incorporated areas, inspectors distribute flyers outlining the dos and don’ts of FOG management and request that these flyers be displayed at workstations for workers to see.
As a condition of the Industrial Waste Permit, FSEs must record the maintenance of grease trap/interceptors on a maintenance log report. The log records date of the service performed, types of services performed, and person/company providing service.
Additionally, for any liquid or solid industrial wastes transported from the site, FSEs must obtain and keep copies of receipts for grease trap/interceptor maintenance and pumping for at least 180 days.
The maintenance log report and receipts shall be made available to the county and the City (if applicable) upon request.
City of Montebello
Sewer System Management Plan (SSMP) May 2025
37 The County implements the following procedure to identify and manage sections of the system impacted by FOG blockages:
• Identification: Sections impacted by FOG blockages are identified through regular inspections conducted by cleaning crews, CCTV inspections, and reports of spills.
• Investigation: Once identified, these sections are thoroughly investigated to assess the extent of the blockages and determine the appropriate actions needed to address them.
• Maintenance: Based on the investigation findings, a periodic cleaning schedule is defined and implemented for each affected section to ensure ongoing maintenance and prevent future blockages.
7.5 Authority to Inspect Grease Producing Facilities, Enforce Authorities, and Evidence of Adequate Staffing To Inspect and Enforce the FOG Ordinance The LACO Code, Section 20.24.090, which will be adopted by the City, gives the City Director of Public Works the authority to inspect FOG-producing facilities, prohibiting the discharge of substances that may obstruct or require frequent maintenance of the sewer system.
When SMD encounters FOG issues in the collection system, whether from spills CCTV inspections, or sewer cleaning, the source of the problem is evaluated as either residential, commercial, or both. For residential spills, SMD may notify residents door-todoor, providing information on proper grease disposal practices. For recurring issues, the affected area is placed on a preventive maintenance schedule.
In the case of commercial spills, the incident is referred to EPD for investigation. EPD checks GRD maintenance and requires corrective actions when needed. If an FSE without a GRD is responsible for a spill, EPD mandates the installation of a GRD. If a GRDequipped FSE causes a spill, more frequent maintenance may be required. All investigations are documented in the HMS database, and results are communicated to SMD as relevant.
The County DPW in concert with the City Engineer is also responsible for the enforcement of all industrial waste permit and Code violations in the City.
7.6 Cleaning Schedule for Identified FOG Prone Sewer Segments Cleaning of FOG prone segments is contracted and performed by the Sewer Management
City of Montebello
Sewer System Management Plan (SSMP) May 2025
38 District. The methods are used per LA County Maintenance and Operation. These are typically cleaned by hydro jetting and rodding if tree roots are encountered. Those portions of the system found to have persistent FOG problems are put on monthly, quarterly, or semi-annual periodic cleaning schedule, depending on the magnitude of the problem.
Grease Haulers and FOG Disposal Sites
Baker Commodities, Inc 4020 Bandini Blvd
Los Angeles, CA
(Vernon, CA)
(323) 269-6177 or
(800) 427-0696
Grease recycler. Drop
off location and grease
trap cleaning/hauling
Darling International 2626 E 25th St
Los Angeles, CA
(800) 447-3273 Drop off location and
grease trap
cleaning/hauling
LACSD Lancaster
Wastewater Treatment
Plan
1865 West Avenue D
Lancaster, CA
(562) 699-7411,
ext. 2301
Accepts grease trap
and interceptor waste
One More Time 4144 Bandini Blvd
Los Angeles, CA
(Vernon, CA)
(800) 624-5504
Southwest Processors 4 4120 Bandini Blvd
Los Angeles, CA
(Vernon, CA)
(800) 900-3366 Grease recycler. Drop
off location and grease
trap cleaning/hauling
Grease Hauler
Roto-Rooter Plumbing Services (661) 948-1048 or
(775) 345-5300
Grease and cooking oil removal; grease
trap pumping
Triple A Pumping & Jetting Inc. (714) 628-0900 Grease and cooking oil removal; grease trap pumping.
7.7 Source Control of FOG
Common source control BMPs include pre-wiping oily pans and dishes prior to washing them, installing drain screens in sinks to catch food particles, cleaning hoods regularly, training employees, and maintaining records of training and maintenance activities. As previously discussed, the City conducts FOG inspections at food service establishments (FSEs) for compliance with the source control BMP requirements.
8.0 SYSTEM EVALUATION AND CAPACITY ASSURANCE PLAN
The City’s System Evaluation and Capacity Assurance Plan addresses the mandatory provisions as outlined in the SSSWDR Section D.13.(vii). These include the following:
City of Montebello
Sewer System Management Plan (SSMP) May 2025
39 1) Evaluation: Actions needed to evaluate those portions of the sanitary sewer system that are experiencing or contributing to an SSO discharge caused by hydraulic deficiency. The evaluation must provide estimates of peak flows (including flows from SSOs that escape from the system) associated with conditions similar to those causing overflow events, estimates of the capacity of key system components, hydraulic deficiencies (including components of the system with limiting capacity) and the major sources that contribute to the peak flows associated with overflow events.
2) Design Criteria: Where design criteria do not exist or are deficient, undertake the evaluation identified in (1) above to establish appropriate design criteria; and 3) Capacity Enhancement Measures: The steps needed to establish a short- and longterm CIP to address identified hydraulic deficiencies, including prioritization, alternatives analysis, and schedules. The CIP may include increases in pipe size, I/I reduction programs, increases and redundancy in pumping capacity, and storage facilities. The CIP shall include an implementation schedule and shall identify sources of funding.
4) Schedule: The Enrollee shall develop a schedule of completion dates for all portions of the capital improvement program developed in (1)-(3) above. This schedule shall be reviewed and updated consistent with the SSMP review and update requirements as described in Section D. 14.
8.1 System Evaluation and Capacity Assurance
The City Public Works Department Engineering Division is responsible for ensuring that the public sewer infrastructure is correctly designed, adequately sized and easily maintainable. Public Works Department also provides a supporting role in reviewing all proposed sewer plans for new developments in the City to ensure that they conform to County design standards and particularly to ensure that LA County Sanitation District’s requirements for acceptability of treatment. A comprehensive capacity evaluation using a dynamic hydraulic model is performed to quantify flows and capacities in all major sewers under current and future flow conditions.
The hydraulic model was used to generate peak flows in each modeled pipe and to evaluate pipe capacities. A pipe was considered to have inadequate capacity if the ratio of flow depth to pipe diameter (d/D) at peak dry weather flow exceeded 75 percent under either existing or future conditions.
City of Montebello
Sewer System Management Plan (SSMP) May 2025
40 The City signs a yearly Sewer Management Agreement with Los Angeles County. The County uses CCTV inspection as the primary means for collecting visual observations of system conditions. This CCTV inspection program digitally records the condition of the pipe interior from manhole to manhole using a robotic camera tethered to a camera van.
While the video is being captured, a National Association of Sewer Service Companies (NASSCO) Pipeline Assessment and Certification Program (PACP) certified crew member views and logs events such as defects and observations using the standardized NASSCO PACP observation codes. With GraniteNet, the digital video inspections files are transferred via cloud enabling access to anyone with credentials and password access using a laptop or mobile device.
In addition to CCTV inspection, visual inspection is conducted on sewer facilities during sewer system maintenance activities. In the past, a field crew would documents visual observations and system issues on a form to trigger follow up inspections and repair actions. With the implementation of Cityworks, field crews now provide these observations electronically using mobile devices for immediate communication to SMD Superintendents and Supervisors to trigger follow-on actions to address issues.
8.2 Adequate Capacity and Correct Design
In addition to the criteria used to evaluate the capacity of existing sewers (as described in the preceding section), the City has separate criteria they enforce for the design of all new sewers. The City’s Public Works Department Engineering Design Guidelines and Sanitary Sewer Master Plan establish design guidelines for private development and public projects within the City of Montebello. The Sanitary Sewer Master Plan identifies design criteria for new sewer systems including unit flow factors, peaking factors, hydraulic friction factors, minimum slopes, and maximum allowable depth of flow. Prior to the approval of new sewers, the City requires that developers perform a sewer area study that applies these criteria to confirm the adequacy of the proposed sewers.
The City Engineer or hired qualified private company provides thorough review of all sewer plans for proposed development projects in the City to ensure that: 1) they are properly designed with sufficient capacity for current and future base, peak and wet weather flow demands; and 2) any impact of proposed project on existing sewer system is mitigated prior to being approved by the City Engineer. During construction, the projects are continuously inspected by the City Engineer or hired construction inspectors to ensure that the sewer facilities are constructed in accordance with the approved plans and specifications.
City of Montebello
Sewer System Management Plan (SSMP) May 2025
41 8.3 Capacity Enhancement Plan
The collection sewer system capacity enhancement program is a combined effort of City Public Works Department Engineering Division. The City programs to optimize the use of available sewer capacity and prevent SSOs include the CCTV program to identify pipe segments needing repairs or with I/I or tree root intrusion problems, sewer cleaning program and the CIP program to effect repairs or replacement of damaged pipes.
The City’s CIP is presented in the 2010 Sanitary Sewer Master Plan as previously described. It includes recommended completion dates for the various phases of replacement and rehabilitation. The Engineering Department reviews the CIP on an annual basis and adjusts if necessary to address the most critical issues.
9.0 MONITORING, MEASUREMENT, MODIFICATION PROGRAM
The City’s Monitoring, Measurement, and Program Modifications addresses the mandatory provisions outlined in SSWDR Section D.13.(ix). These components include:
1) Maintain relevant information that can be used to establish and prioritize appropriate SSMP activities;
2) Monitor the implementation and, where appropriate, measure the effectiveness of each element of the SSMP;
3) Assess the success of the preventative maintenance program; 4) Update program elements, as appropriate, based on monitoring or performance evaluations; and
5) Identify and illustrate SSO trends, including: frequency, location, and volume.
9.1 Performance Measures
The City will document all relevant data on SSOs that occurred in the City. These will include the quarterly SSO reports from City PWD, Annual Reports published by City, Sewer Maintenance Productivity Report and any special reports to regulatory agencies etc. In addition, LA County publishes a Sewer Maintenance District yearly Productivity Report of all services provided. The data will be analyzed to evaluate the effectiveness of the City’s SSMP.
City of Montebello
Sewer System Management Plan (SSMP) May 2025
42 9.2 SSMP Program Effectiveness Evaluation
The evaluation of the City’s SSMP Program Effectiveness shall be based on such key performance indicators as the total number of overflows, overflow response time, reduction in repeated incidents of SSO at some location, total overflow equal to or greater than 1,000 gallons or reaching the waters of the United States and reduction in number of overflows that are caused by sewer capacity-related problems.
Every three years, the City performs an internal audit of the SSMP and the SSMP program implementation. Each element of the SSMP is reviewed for effectiveness towards reducing the frequency and/or mitigating the impacts of spills and for compliance with the General Order requirements. Corrective actions to address identified deficiencies are prioritized, scheduled and incorporated into plans.
9.3 Preventative Maintenance Program Modification
The City shall continually update or modify the key elements of its SSMP based on the results of the above mentioned monitoring and program effectiveness evaluations. The City shall also make recommendations, as necessary, on elements of the SSMP to be adjusted or revised within the City boundaries to better serve its residents.
The City updates this SSMP every six years. The update consists of reviewing the existing SSMP language and updating any outdated information by incorporating adopted and implemented recommendations from previous SSMP program audits. Upon completion of the six-year SSMP update, the SSMP is provided to the City Council for approval. Upon City Council approval, the SSMP is uploaded to the State Water Board CIWQS database and certified.
9.4 Update Program Elements
The Public Works Director is responsible for ensuring that the wastewater system is managed in accordance with this SSMP. Monitoring and performance standards are annually evaluated by the Public Works Director and any improvements or modifications to the SSMP program elements as noted will be implemented as soon as practical.
9.5 Identify and illustrate SSO trends
Mapping of SSO Frequencies - The monthly numbers of SSOs charts and graphs prepared by City will be presented in Appendix J. The graphs are used for identifying SSO trends and to evaluate overall program effectiveness. The charts are used to identify SSO trends and as an indicator of possible Infiltration/Inflow problem. SSO trends are also annually
City of Montebello
Sewer System Management Plan (SSMP) May 2025
43 evaluated as part of the performance parameters previously discussed.
10.0 SSMP PROGRAM AUDIT AND CERTIFICATION
The City is committed to continually reviewing and updating its SSMP in order to be the most effective at managing, operating, and maintaining the sanitary sewer system. The SSSWDR Section D.13.(x) is stated below:
As part of the SSMP, the Enrollee shall conduct periodic internal audits, appropriate to the size of the system and the number of SSOs. At a minimum, these audits must occur every three years and a report must be prepared and kept on file. This audit shall focus on evaluating the effectiveness of the SSMP and the Enrollee’s compliance with the SSMP requirements identified in this subsection (D.13), including identification of any deficiencies in the SSMP and steps to correct them.
10.1 SSMP Program Audit
The City shall conduct an internal audit and prepare a report every three years. The audit shall focus on evaluating the effectiveness of the SSMP and records of City compliance actions during the audit period. The most recent report of the audit must be kept on file in the City’s Director of Public Works office. Each audit report includes, but is not limited to, the following:
• Identification of any program deficiencies and discussion of how these deficiencies have been or will be remedied.
• Evaluation of the performance parameters discussed in the “Monitoring, Measurement, and Program Modification” section of the SSMP. • Details of action plans that will be implemented to restore poor performance measures to an acceptable level, as applicable.
• Description of system improvements within the audit period. • Description of system improvements planned for the next two years. • Summary of SSMP updates, as applicable.
City of Montebello
Sewer System Management Plan (SSMP) May 2025
44 10.2 SSMP Certification
The SSMP shall be certified by the City Director of Public Works or authorized representatives to be in compliance with the requirements set forth in the WDR’s and be presented to the City Council for approval at a public meeting. The City authorized representative must also complete the certification portion in the Online SSO Database Questionnaire (http://ciwqs.waterboards.ca.gov/) by checking the appropriate milestone box, printing and signing the automated form and sending the signed form to:
State Water Resources Control Board Division of Water Quality Attn: SSO Program Manager
P.O. Box 100
Sacramento, CA 95812
10.3 SSMP Modification and Re-certification
The SSMP must be updated every six years to keep it current. When significant amendments are made to any portion or portions of the SSMP, it must be resubmitted to the City Council for approval and re-certification. The re-certification shall be in accordance with the certification process described in Section 10.2 above.
11.0 COMMUNICATION AND SSMP AVAILABILITY
11.1 Communication
The City shall provide all stakeholders and interested parties such as the general public and other agencies, with status updates on the development and implementation of the SSMP and consider comments made by them. The City shall utilize media such as letters, newsletters, brochures, notices in newspapers, and the City’s home web page for conveying this information.
11.2 SSMP Availability
Copies of the SSMP will be maintained in the City’s Director of Public Works Office and posted in the City’s home web page. The document shall also be made readily available to the Regional Water Quality Control Board (Regions 4) upon request and to the operators of any collection system or treatment facility downstream of the City’s system.
City of Montebello
Sewer System Management Plan (SSMP) May 2025
APPENDIX A
WASTE DISCHARGE REQUIREMENTS
SWRCR Order 2006-003
WQ2013-0058EXEC
STATE OF CALIFORNIA
WATER RESOURCES CONTROL BOARD
ORDER NO. WQ 2013-0058-EXEC
AMENDING MONITORING AND REPORTING PROGRAM
FOR
STATEWIDE GENERAL WASTE DISCHARGE REQUIREMENTS FOR
SANITARY SEWER SYSTEMS
The State of California, Water Resources Control Board (hereafter State Water Board) finds:
1. The State Water Board is authorized to prescribe statewide general Waste Discharge Requirements (WDRs) for categories of discharges that involve the same or similar operations and the same or similar types of waste pursuant to Water Code section 13263(i).
2. Water Code section 13193 et seq. requires the Regional Water Quality Control Boards (Regional Water Boards) and the State Water Board (collectively, the Water Boards) to gather Sanitary Sewer Overflow (SSO) information and make this information available to the public, including but not limited to, SSO cause, estimated volume, location, date, time, duration, whether or not the SSO reached or may have reached waters of the state, response and corrective action taken, and an enrollee's contact information for each SSO event. An enrollee is defined as the public entity having legal authority over the operation and maintenance of, or capital improvements to, a sanitary sewer system greater than one mile in length.
3. Water Code section 13271, et seq. requires notification to the California Office of Emergency Services (Cal OES), formerly the California Emergency Management Agency, for certain unauthorized discharges, including SSOs.
4. On May 2, 2006, the State Water Board adopted Order 2006-0003-DWQ, "Statewide Waste Discharge Requirements for Sanitary Sewer Systems"1(hereafter SSS WDRs) to comply with Water Code section 13193 and to establish the framework for the statewide SSO Reduction Program.
5. Subsection G.2 of the SSS WDRs and the Monitoring and Reporting Program (MRP) provide that the Executive Director may modify the terms of the MRP at any time.
6. On February 20, 2008, the State Water Board Executive Director adopted a revised MRP for the SSS WDRs to rectify early notification deficiencies and ensure that first responders are notified in a timely manner of SSOs discharged into waters of the state.
7. When notified of an SSO that reaches a drainage channel or surface water of the state, Cal OES, pursuant to Water Code section 13271(a)(3), forwards the SSO notification information2 to local government agencies and first responders including local public health officials and the applicable Regional Water Board. Receipt of notifications for a single SSO event from both the SSO reporter 1 Available for download at:
http://www.waterboards.ca.gov/board decisions/adopted orders/water guality/2006/wgo/wgo2006 0003.pdf 2 Cal OES Hazardous Materials Spill Reports available Online at:
http://w3.calema.ca.gov/operational/malhaz.nsf/$defaultview and http://w3.calema.ca.gov/operational/malhaz.nsf
Monitoring and Reporting Program Order No. WQ 2013-0058-EXEC Statewide Waste Discharge Requirements for Sanitary Sewer Systems
and Cal OES is duplicative. To address this, the SSO notification requirements added by the February 20, 2008 MRP revision are being removed in this MRP revision.
8. In the February 28, 2008 Memorandum of Agreement between the State Water Board and the California Water and Environment Association (CWEA), the State Water Board committed to redesigning the CIWQS3 Online SSO Database to allow "event" based SSO reporting versus the original "location" based reporting. Revisions to this MRP and accompanying changes to the CIWQS Online SSO Database will implement this change by allowing for multiple SSO appearance points to be associated with each SSO event caused by a single asset failure.
9. Based on stakeholder input and Water Board staff experience implementing the SSO Reduction Program, SSO categories have been revised in this MRP. In the prior version of the MRP, SSOs have been categorized as Category 1 or Category 2. This MRP implements changes to SSO categories by adding a Category 3 SSO type. This change will improve data management to further assist Water Board staff with evaluation of high threat and low threat SSOs by placing them in unique categories (i.e., Category 1 and Category 3, respectively). This change will also assist enrollees in identifying SSOs that require Cal OES notification.
10. Based on over six years of implementation of the SSS WDRs, the State Water Board concludes that the February 20, 2008 MRP must be updated to better advance the SSO Reduction Program4 objectives, assess compliance, and enforce the requirements of the SSS WDRs.
IT IS HEREBY ORDERED THAT:
Pursuant to the authority delegated by Water Code section 13267(f), Resolution 2002-0104, and Order 2006-0003-DWQ, the MRP for the SSS WDRs (Order 2006-0003-DWQ) is hereby amended as shown in Attachment A and shall be effective on September 9, 2013.
Date
3 California Integrated Water Quality System (CIWQS) publicly available at http://www.waterboards.ca.gov/ciwgs/publicreports.shtml 4 Statewide Sanitary Sewer Overflow Reduction Program information is available at:
http://www.waterboards.ca.gov/water issues/proqrams/sso/
ATTACHMENT A
STATE WATER RESOURCES CONTROL BOARD
ORDER NO. WQ 2013-0058-EXEC
AMENDING MONITORING AND REPORTING PROGRAM
FOR
STATEWIDE GENERAL WASTE DISCHARGE REQUIREMENTS FOR
SANITARY SEWER SYSTEMS
This Monitoring and Reporting Program (MRP) establishes monitoring, record keeping, reporting and public notification requirements for Order 2006-0003-DWQ, “Statewide General Waste Discharge Requirements for Sanitary Sewer Systems” (SSS WDRs). This MRP shall be effective from September 9, 2013 until it is rescinded. The Executive Director may make revisions to this MRP at any time. These revisions may include a reduction or increase in the monitoring and reporting requirements. All site specific records and data developed pursuant to the SSS WDRs and this MRP shall be complete, accurate, and justified by evidence maintained by the enrollee. Failure to comply with this MRP may subject an enrollee to civil liabilities of up to $5,000 a day per violation pursuant to Water Code section 13350; up to $1,000 a day per violation pursuant to Water Code section 13268; or referral to the Attorney General for judicial civil enforcement. The State Water Resources Control Board (State Water Board) reserves the right to take any further enforcement action authorized by law.
A. SUMMARY OF MRP REQUIREMENTS
Table 1 – Spill Categories and Definitions
CATEGORIES DEFINITIONS [see Section A on page 5 of Order 2006-0003-DWQ, for Sanitary Sewer Overflow (SSO) definition]
CATEGORY 1 Discharges of untreated or partially treated wastewater of any volume resulting from an enrollee’s sanitary sewer system failure or flow condition that:
• Reach surface water and/or reach a drainage channel tributary to a surface water; or
• Reach a Municipal Separate Storm Sewer System (MS4) and are not fully captured and returned to the sanitary sewer system or not otherwise captured and disposed of properly. Any volume of wastewater not recovered from the MS4 is considered to have reached surface water unless the storm drain system discharges to a dedicated storm water or groundwater infiltration basin (e.g., infiltration pit, percolation pond).
CATEGORY 2 Discharges of untreated or partially treated wastewater of 1,000 gallons or greater resulting from an enrollee’s sanitary sewer system failure or flow condition that do not reach surface water, a drainage channel, or a MS4 unless the entire SSO discharged to the storm drain system is fully recovered and disposed of properly.
CATEGORY 3 All other discharges of untreated or partially treated wastewater resulting from an enrollee’s sanitary sewer system failure or flow condition.
PRIVATE LATERAL
SEWAGE
DISCHARGE (PLSD)
Discharges of untreated or partially treated wastewater resulting from blockages or other problems within a privately owned sewer lateral connected to the enrollee’s sanitary sewer system or from other private sewer assets. PLSDs that the enrollee becomes aware of may be voluntarily reported to the California Integrated Water Quality System (CIWQS) Online SSO Database.
Monitoring and Reporting Program Order No. WQ 2013-0058-EXEC Statewide Waste Discharge Requirements for Sanitary Sewer Systems
Table 2 – Notification, Reporting, Monitoring, and Record Keeping Requirements
ELEMENT REQUIREMENT METHOD
NOTIFICATION
(see section B of
MRP)
• Within two hours of becoming aware of any
Category 1 SSO greater than or equal to
1,000 gallons discharged to surface water or
spilled in a location where it probably will be
discharged to surface water, notify the
California Office of Emergency Services (Cal
OES) and obtain a notification control number.
Call Cal OES at:
(800) 852-7550
REPORTING
(see section C of
MRP)
• Category 1 SSO: Submit draft report within three
business days of becoming aware of the SSO and
certify within 15 calendar days of SSO end date.
• Category 2 SSO: Submit draft report within 3
business days of becoming aware of the SSO and
certify within 15 calendar days of the SSO end
date.
Enter data into the CIWQS Online
SSO Database
(http://ciwqs.waterboards.ca.gov/),
certified by enrollee’s Legally
Responsible Official(s).
• Category 3 SSO: Submit certified report within
30 calendar days of the end of month in which
SSO the occurred.
• SSO Technical Report: Submit within 45
calendar days after the end date of any Category
1 SSO in which 50,000 gallons or greater are
spilled to surface waters.
• “No Spill” Certification: Certify that no SSOs
occurred within 30 calendar days of the end of the
month or, if reporting quarterly, the quarter in
which no SSOs occurred.
• Collection System Questionnaire: Update and
certify every 12 months.
WATER
QUALITY
MONITORING
(see section D of
MRP)
• Conduct water quality sampling within 48 hours
after initial SSO notification for Category 1 SSOs
in which 50,000 gallons or greater are spilled to
surface waters.
Water quality results are required
to be uploaded into CIWQS for
Category 1 SSOs in which 50,000
gallons or greater are spilled to
surface waters.
RECORD
KEEPING
(see section E of
MRP)
• SSO event records.
• Records documenting Sanitary Sewer
Management Plan (SSMP) implementation and
changes/updates to the SSMP.
Self-maintained records shall be
available during inspections or
upon request.
• Records to document Water Quality Monitoring
for SSOs of 50,000 gallons or greater spilled to
surface waters.
• Collection system telemetry records if relied upon
to document and/or estimate SSO Volume.
Monitoring and Reporting Program Order No. WQ 2013-0058-EXEC Statewide Waste Discharge Requirements for Sanitary Sewer Systems
B. NOTIFICATION REQUIREMENTS
Although Regional Water Quality Control Boards (Regional Water Boards) and the State Water Board (collectively, the Water Boards) staff do not have duties as first responders, this MRP is an appropriate mechanism to ensure that the agencies that have first responder duties are notified in a timely manner in order to protect public health and beneficial uses.
1. For any Category 1 SSO greater than or equal to 1,000 gallons that results in a discharge to a surface water or spilled in a location where it probably will be discharged to surface water, either directly or by way of a drainage channel or MS4, the enrollee shall, as soon as possible, but not later than two (2) hours after (A) the enrollee has knowledge of the discharge, (B) notification is possible, and (C) notification can be provided without substantially impeding cleanup or other emergency measures, notify the Cal OES and obtain a notification control number.
2. To satisfy notification requirements for each applicable SSO, the enrollee shall provide the information requested by Cal OES before receiving a control number. Spill information requested by Cal OES may include:
i. Name of person notifying Cal OES and direct return phone number. ii. Estimated SSO volume discharged (gallons).
iii. If ongoing, estimated SSO discharge rate (gallons per minute). iv. SSO Incident Description:
a. Brief narrative.
b. On-scene point of contact for additional information (name and cell phone number). c. Date and time enrollee became aware of the SSO.
d. Name of sanitary sewer system agency causing the SSO. e. SSO cause (if known).
v. Indication of whether the SSO has been contained.
vi. Indication of whether surface water is impacted.
vii. Name of surface water impacted by the SSO, if applicable. viii. Indication of whether a drinking water supply is or may be impacted by the SSO. ix. Any other known SSO impacts.
x. SSO incident location (address, city, state, and zip code).
3. Following the initial notification to Cal OES and until such time that an enrollee certifies the SSO report in the CIWQS Online SSO Database, the enrollee shall provide updates to Cal OES regarding substantial changes to the estimated volume of untreated or partially treated sewage discharged and any substantial change(s) to known impact(s).
4. PLSDs: The enrollee is strongly encouraged to notify Cal OES of discharges greater than or equal to 1,000 gallons of untreated or partially treated wastewater that result or may result in a discharge to surface water resulting from failures or flow conditions within a privately owned sewer lateral or from other private sewer asset(s) if the enrollee becomes aware of the PLSD.
Monitoring and Reporting Program Order No. WQ 2013-0058-EXEC Statewide Waste Discharge Requirements for Sanitary Sewer Systems
C. REPORTING REQUIREMENTS
1. CIWQS Online SSO Database Account: All enrollees shall obtain a CIWQS Online SSO Database account and receive a “Username” and “Password” by registering through CIWQS.
These accounts allow controlled and secure entry into the CIWQS Online SSO Database.
2. SSO Mandatory Reporting Information: For reporting purposes, if one SSO event results in multiple appearance points in a sewer system asset, the enrollee shall complete one SSO report in the CIWQS Online SSO Database which includes the GPS coordinates for the location of the SSO appearance point closest to the failure point, blockage or location of the flow condition that caused the SSO, and provide descriptions of the locations of all other discharge points associated with the SSO event.
3. SSO Categories
i. Category 1 – Discharges of untreated or partially treated wastewater of any volume resulting from an enrollee’s sanitary sewer system failure or flow condition that:
a. Reach surface water and/or reach a drainage channel tributary to a surface water; or b. Reach a MS4 and are not fully captured and returned to the sanitary sewer system or not otherwise captured and disposed of properly. Any volume of wastewater not recovered from the MS4 is considered to have reached surface water unless the storm drain system discharges to a dedicated storm water or groundwater infiltration basin (e.g., infiltration pit, percolation pond).
ii. Category 2 – Discharges of untreated or partially treated wastewater greater than or equal to 1,000 gallons resulting from an enrollee’s sanitary sewer system failure or flow condition that does not reach a surface water, a drainage channel, or the MS4 unless the entire SSO volume discharged to the storm drain system is fully recovered and disposed of properly.
iii. Category 3 – All other discharges of untreated or partially treated wastewater resulting from an enrollee’s sanitary sewer system failure or flow condition.
4. Sanitary Sewer Overflow Reporting to CIWQS - Timeframes i. Category 1 and Category 2 SSOs – All SSOs that meet the above criteria for Category 1 or Category 2 SSOs shall be reported to the CIWQS Online SSO Database:
a. Draft reports for Category 1 and Category 2 SSOs shall be submitted to the CIWQS Online SSO Database within three (3) business days of the enrollee becoming aware of the SSO. Minimum information that shall be reported in a draft Category 1 SSO report shall include all information identified in section 8.i.a. below. Minimum information that shall be reported in a Category 2 SSO draft report shall include all information identified in section 8.i.c below.
b. A final Category 1 or Category 2 SSO report shall be certified through the CIWQS Online SSO Database within 15 calendar days of the end date of the SSO. Minimum information that shall be certified in the final Category 1 SSO report shall include all information identified in section 8.i.b below. Minimum information that shall be certified in a final Category 2 SSO report shall include all information identified in section 8.i.d below.
Monitoring and Reporting Program Order No. WQ 2013-0058-EXEC Statewide Waste Discharge Requirements for Sanitary Sewer Systems
ii. Category 3 SSOs – All SSOs that meet the above criteria for Category 3 SSOs shall be reported to the CIWQS Online SSO Database and certified within 30 calendar days after the end of the calendar month in which the SSO occurs (e.g., all Category 3 SSOs occurring in the month of February shall be entered into the database and certified by March 30). Minimum information that shall be certified in a final Category 3 SSO report shall include all information identified in section 8.i.e below. iii. “No Spill” Certification – If there are no SSOs during the calendar month, the enrollee shall either 1) certify, within 30 calendar days after the end of each calendar month, a “No Spill” certification statement in the CIWQS Online SSO Database certifying that there were no SSOs for the designated month, or 2) certify, quarterly within 30 calendar days after the end of each quarter, “No Spill” certification statements in the CIWQS Online SSO Database certifying that there were no SSOs for each month in the quarter being reported on. For quarterly reporting, the quarters are Q1 - January/ February/ March, Q2 - April/May/June, Q3 - July/August/September, and Q4 - October/November/December.
If there are no SSOs during a calendar month but the enrollee reported a PLSD, the enrollee shall still certify a “No Spill” certification statement for that month. iv. Amended SSO Reports – The enrollee may update or add additional information to a certified SSO report within 120 calendar days after the SSO end date by amending the report or by adding an attachment to the SSO report in the CIWQS Online SSO Database.
SSO reports certified in the CIWQS Online SSO Database prior to the adoption date of this MRP may only be amended up to 120 days after the effective date of this MRP. After 120 days, the enrollee may contact the SSO Program Manager to request to amend an SSO report if the enrollee also submits justification for why the additional information was not available prior to the end of the 120 days.
5. SSO Technical Report
The enrollee shall submit an SSO Technical Report in the CIWQS Online SSO Database within 45 calendar days of the SSO end date for any SSO in which 50,000 gallons or greater are spilled to surface waters. This report, which does not preclude the Water Boards from requiring more detailed analyses if requested, shall include at a minimum, the following:
i. Causes and Circumstances of the SSO:
a. Complete and detailed explanation of how and when the SSO was discovered. b. Diagram showing the SSO failure point, appearance point(s), and final destination(s). c. Detailed description of the methodology employed and available data used to calculate the volume of the SSO and, if applicable, the SSO volume recovered. d. Detailed description of the cause(s) of the SSO.
e. Copies of original field crew records used to document the SSO. f. Historical maintenance records for the failure location. ii. Enrollee’s Response to SSO:
a. Chronological narrative description of all actions taken by enrollee to terminate the spill.
b. Explanation of how the SSMP Overflow Emergency Response plan was implemented to respond to and mitigate the SSO.
Monitoring and Reporting Program Order No. WQ 2013-0058-EXEC Statewide Waste Discharge Requirements for Sanitary Sewer Systems
c. Final corrective action(s) completed and/or planned to be completed, including a schedule for actions not yet completed.
iii. Water Quality Monitoring:
a. Description of all water quality sampling activities conducted including analytical results and evaluation of the results.
b. Detailed location map illustrating all water quality sampling points.
6. PLSDs
Discharges of untreated or partially treated wastewater resulting from blockages or other problems within a privately owned sewer lateral connected to the enrollee’s sanitary sewer system or from other private sanitary sewer system assets may be voluntarily reported to the CIWQS Online SSO Database.
i. The enrollee is also encouraged to provide notification to Cal OES per section B above when a PLSD greater than or equal to 1,000 gallons has or may result in a discharge to surface water. For any PLSD greater than or equal to 1,000 gallons regardless of the spill destination, the enrollee is also encouraged to file a spill report as required by Health and Safety Code section 5410 et. seq. and Water Code section 13271, or notify the responsible party that notification and reporting should be completed as specified above and required by State law.
ii. If a PLSD is recorded in the CIWQS Online SSO Database, the enrollee must identify the sewage discharge as occurring and caused by a private sanitary sewer system asset and should identify a responsible party (other than the enrollee), if known. Certification of PLSD reports by enrollees is not required.
7. CIWQS Online SSO Database Unavailability
In the event that the CIWQS Online SSO Database is not available, the enrollee must fax or e-mail all required information to the appropriate Regional Water Board office in accordance with the time schedules identified herein. In such event, the enrollee must also enter all required information into the CIWQS Online SSO Database when the database becomes available.
8. Mandatory Information to be Included in CIWQS Online SSO Reporting All enrollees shall obtain a CIWQS Online SSO Database account and receive a “Username” and “Password” by registering through CIWQS which can be reached at [email protected] or by calling (866) 792-4977, M-F, 8 A.M. to 5 P.M. These accounts will allow controlled and secure entry into the CIWQS Online SSO Database.
Additionally, within thirty (30) days of initial enrollment and prior to recording SSOs into the CIWQS Online SSO Database, all enrollees must complete a Collection System Questionnaire (Questionnaire). The Questionnaire shall be updated at least once every 12 months.
i. SSO Reports
At a minimum, the following mandatory information shall be reported prior to finalizing and certifying an SSO report for each category of SSO:
Monitoring and Reporting Program Order No. WQ 2013-0058-EXEC Statewide Waste Discharge Requirements for Sanitary Sewer Systems
a. Draft Category 1 SSOs: At a minimum, the following mandatory information shall be reported for a draft Category 1 SSO report:
1. SSO Contact Information: Name and telephone number of enrollee contact person who can answer specific questions about the SSO being reported.
2. SSO Location Name.
3. Location of the overflow event (SSO) by entering GPS coordinates. If a single overflow event results in multiple appearance points, provide GPS coordinates for the appearance point closest to the failure point and describe each additional appearance point in the SSO appearance point explanation field.
4. Whether or not the SSO reached surface water, a drainage channel, or entered and was discharged from a drainage structure.
5. Whether or not the SSO reached a municipal separate storm drain system.
6. Whether or not the total SSO volume that reached a municipal separate storm drain system was fully recovered.
7. Estimate of the SSO volume, inclusive of all discharge point(s).
8. Estimate of the SSO volume that reached surface water, a drainage channel, or was not recovered from a storm drain.
9. Estimate of the SSO volume recovered (if applicable).
10. Number of SSO appearance point(s).
11. Description and location of SSO appearance point(s). If a single sanitary sewer system failure results in multiple SSO appearance points, each appearance point must be described.
12. SSO start date and time.
13. Date and time the enrollee was notified of, or self-discovered, the SSO.
14. Estimated operator arrival time.
15. For spills greater than or equal to 1,000 gallons, the date and time Cal OES was called.
16. For spills greater than or equal to 1,000 gallons, the Cal OES control number. b. Certified Category 1 SSOs: At a minimum, the following mandatory information shall be reported for a certified Category 1 SSO report, in addition to all fields in section
8.i.a :
1. Description of SSO destination(s).
2. SSO end date and time.
3. SSO causes (mainline blockage, roots, etc.).
4. SSO failure point (main, lateral, etc.).
5. Whether or not the spill was associated with a storm event.
6. Description of spill corrective action, including steps planned or taken to reduce, eliminate, and prevent reoccurrence of the overflow; and a schedule of major milestones for those steps.
7. Description of spill response activities.
8. Spill response completion date.
9. Whether or not there is an ongoing investigation, the reasons for the investigation and the expected date of completion.
Monitoring and Reporting Program Order No. WQ 2013-0058-EXEC Statewide Waste Discharge Requirements for Sanitary Sewer Systems
10. Whether or not a beach closure occurred or may have occurred as a result of the SSO.
11. Whether or not health warnings were posted as a result of the SSO.
12. Name of beach(es) closed and/or impacted. If no beach was impacted, NA shall be selected.
13. Name of surface water(s) impacted.
14. If water quality samples were collected, identify parameters the water quality samples were analyzed for. If no samples were taken, NA shall be selected.
15. If water quality samples were taken, identify which regulatory agencies received sample results (if applicable). If no samples were taken, NA shall be selected.
16. Description of methodology(ies) and type of data relied upon for estimations of the SSO volume discharged and recovered.
17. SSO Certification: Upon SSO Certification, the CIWQS Online SSO Database will issue a final SSO identification (ID) number.
c. Draft Category 2 SSOs: At a minimum, the following mandatory information shall be reported for a draft Category 2 SSO report:
1. Items 1-14 in section 8.i.a above for Draft Category 1 SSO. d. Certified Category 2 SSOs: At a minimum, the following mandatory information shall be reported for a certified Category 2 SSO report:
1. Items 1-14 in section 8.i.a above for Draft Category 1 SSO and Items 1-9, and 17 in section 8.i.b above for Certified Category 1 SSO.
e. Certified Category 3 SSOs: At a minimum, the following mandatory information shall be reported for a certified Category 3 SSO report:
1. Items 1-14 in section 8.i.a above for Draft Category 1 SSO and Items 1-5, and 17 in section 8.i.b above for Certified Category 1 SSO.
ii. Reporting SSOs to Other Regulatory Agencies
These reporting requirements do not preclude an enrollee from reporting SSOs to other regulatory agencies pursuant to state law. In addition, these reporting requirements do not replace other Regional Water Board notification and reporting requirements for SSOs. iii. Collection System Questionnaire
The required Questionnaire (see subsection G of the SSS WDRs) provides the Water Boards with site-specific information related to the enrollee’s sanitary sewer system. The enrollee shall complete and certify the Questionnaire at least every 12 months to facilitate program implementation, compliance assessment, and enforcement response. iv. SSMP Availability
The enrollee shall provide the publicly available internet web site address to the CIWQS Online SSO Database where a downloadable copy of the enrollee’s approved SSMP, critical supporting documents referenced in the SSMP, and proof of local governing board approval of the SSMP is posted. If all of the SSMP documentation listed in this subsection is not publicly available on the Internet, the enrollee shall comply with the following procedure:
Monitoring and Reporting Program Order No. WQ 2013-0058-EXEC Statewide Waste Discharge Requirements for Sanitary Sewer Systems
a. Submit an electronic copy of the enrollee’s approved SSMP, critical supporting documents referenced in the SSMP, and proof of local governing board approval of the SSMP to the State Water Board, within 30 days of that approval and within 30 days of any subsequent SSMP re-certifications, to the following mailing address:
State Water Resources Control Board
Division of Water Quality
Attn: SSO Program Manager
1001 I Street, 15th Floor, Sacramento, CA 95814
D. WATER QUALITY MONITORING REQUIREMENTS:
To comply with subsection D.7(v) of the SSS WDRs, the enrollee shall develop and implement an SSO Water Quality Monitoring Program to assess impacts from SSOs to surface waters in which 50,000 gallons or greater are spilled to surface waters. The SSO Water Quality Monitoring Program, shall, at a minimum:
1. Contain protocols for water quality monitoring.
2. Account for spill travel time in the surface water and scenarios where monitoring may not be possible (e.g. safety, access restrictions, etc.).
3. Require water quality analyses for ammonia and bacterial indicators to be performed by an accredited or certified laboratory.
4. Require monitoring instruments and devices used to implement the SSO Water Quality Monitoring Program to be properly maintained and calibrated, including any records to document maintenance and calibration, as necessary, to ensure their continued accuracy.
5. Within 48 hours of the enrollee becoming aware of the SSO, require water quality sampling for, at a minimum, the following constituents:
i. Ammonia
ii. Appropriate Bacterial indicator(s) per the applicable Basin Plan water quality objective or Regional Board direction which may include total and fecal coliform, enterococcus, and e-coli.
E. RECORD KEEPING REQUIREMENTS:
The following records shall be maintained by the enrollee for a minimum of five (5) years and shall be made available for review by the Water Boards during an onsite inspection or through an information request:
1. General Records: The enrollee shall maintain records to document compliance with all provisions of the SSS WDRs and this MRP for each sanitary sewer system owned including any required records generated by an enrollee’s sanitary sewer system contractor(s).
2. SSO Records: The enrollee shall maintain records for each SSO event, including but not limited to:
i. Complaint records documenting how the enrollee responded to all notifications of possible or actual SSOs, both during and after business hours, including complaints that do not
Monitoring and Reporting Program Order No. WQ 2013-0058-EXEC Statewide Waste Discharge Requirements for Sanitary Sewer Systems
result in SSOs. Each complaint record shall, at a minimum, include the following information:
a. Date, time, and method of notification.
b. Date and time the complainant or informant first noticed the SSO. c. Narrative description of the complaint, including any information the caller can provide regarding whether or not the complainant or informant reporting the potential SSO knows if the SSO has reached surface waters, drainage channels or storm drains.
d. Follow-up return contact information for complainant or informant for each complaint received, if not reported anonymously.
e. Final resolution of the complaint.
ii. Records documenting steps and/or remedial actions undertaken by enrollee, using all available information, to comply with section D.7 of the SSS WDRs. iii. Records documenting how all estimate(s) of volume(s) discharged and, if applicable, volume(s) recovered were calculated.
3. Records documenting all changes made to the SSMP since its last certification indicating when a subsection(s) of the SSMP was changed and/or updated and who authorized the change or update. These records shall be attached to the SSMP.
4. Electronic monitoring records relied upon for documenting SSO events and/or estimating the SSO volume discharged, including, but not limited to records from:
i. Supervisory Control and Data Acquisition (SCADA) systems ii. Alarm system(s)
iii. Flow monitoring device(s) or other instrument(s) used to estimate wastewater levels, flow rates and/or volumes.
F. CERTIFICATION
1. All information required to be reported into the CIWQS Online SSO Database shall be certified by a person designated as described in subsection J of the SSS WDRs. This designated person is also known as a Legally Responsible Official (LRO). An enrollee may have more than one LRO.
2. Any designated person (i.e. an LRO) shall be registered with the State Water Board to certify reports in accordance with the CIWQS protocols for reporting.
3. Data Submitter (DS): Any enrollee employee or contractor may enter draft data into the CIWQS Online SSO Database on behalf of the enrollee if authorized by the LRO and registered with the State Water Board. However, only LROs may certify reports in CIWQS.
4. The enrollee shall maintain continuous coverage by an LRO. Any change of a registered LRO or DS (e.g., retired staff), including deactivation or a change to the LRO’s or DS’s contact information, shall be submitted by the enrollee to the State Water Board within 30 days of the change by calling (866) 792-4977 or e-mailing [email protected].
Monitoring and Reporting Program Order No. WQ 2013-0058-EXEC Statewide Waste Discharge Requirements for Sanitary Sewer Systems
5. A registered designated person (i.e., an LRO) shall certify all required reports under penalty of perjury laws of the state as stated in the CIWQS Online SSO Database at the time of certification.
CERTIFICATION
The undersigned Clerk to the Board does hereby certify that the foregoing is a full, true, and correct copy of an order amended by the Executive Director of the State Water Resources Control Board.
Date
City of Montebello
Sewer System Management Plan (SSMP) May 2025
APPENDIX B
LOCATION MAP
OPERATION MAINTENANCE YARD
^N
Public Works Maintenance Yard
City of Montebello
Sewer System Management Plan (SSMP) May 2025
APPENDIX C
KEY STAFF CONTACT INFORMATION
City of Montebello
Sewer System Management Plan (SSMP) May 2025
City’s Contact Directory for SSO Responding and Reporting After Hrs. or
Responsible Party’s
Name Telephone After Hours or
Cell Phone
City Manager Raul Alvarez 1-323-887-1367
Director of Public
Works Cesar Roldan 1-323-887-1462
City Engineer 1-323-887-1460
Building Inspector 1-323-887-1497
Public Works Services
Street Maintenance
Juan Hernandez 1-323-887-4613
Code Enforcement 1-323-887-1490
City 24-HOUR
Dispatcher 1-323-246-0214 1-323-246-0214
Police Department 1-323-887-1313 911
Fire Department 1-323-887-4510
LA County Health
Dept. 1-626-430-5420 1-213-974-1234
LA County FL Control
Dist. 1-626-458-4357
LA Co. Sanitation Dist. 1-562-699-7411
RWQCB (LA) 1-213-576-6657 1-213-305-2284
FX 1-213-620-6140
State O.E.S 1-800-852-7550
SMD Superintendent James Pryor 1-323-640-8500
SMD Supervisor Frank Arellano 1-626-201-9627
SMD Supervisor Jim Vives 1-626-589-4455
City of Montebello
Sewer System Management Plan (SSMP) May 2025
APPENDIX D
INVENTORY OF
CITY
COLLECTION FACILITIES & MAP
8 8 8
SAN CLEMENTE
8 City of Montebello
Existing Sanitary Sewer System
FERNFIELD FERNFIELD FERNFIELD
CAMPO CAMPO
CAMPO
8 8 8 8 8 8 8 8
NAPOLI
8 8 8
8 BREVE
SAN CARLO
8 8 8
SAN DELARRO
8 8
8 Alley
8 OLYMPIC
µ
Legend
Manholes
City Sewer Lines
County Sewer Lines
City Boundary
Parcels
City of Montebello
Existing Sanitary Sewer System
0 0.375 Miles
POMONA
POMONA
PASEO
8 CAMPO
8 8
8 BARR
8 AZALEA
BLACKSHEAR
GERHART
SIMMONS
8 8 8 8
KEENAN
8 8 8 8 8 Alley
BRADSHAWE BRADSHAWE
8 8 8 8 8
LEONARD
8 8 8 8 8 8
HENDRICKS
8 HENDRICKS
8 8 8 8 8
FINDLAY
8 8 8 8 8 8 8 8 8
BRADY
NORTE NORTE
8 8
8 8
8 8
FERDINAND
8 8
8 JUNEWAY
8 VAL VERDE
8 8 8 8
MORRIS
8 8
8 8 8 8 8 8 8 VAL VERDE
10 10 10 8 MORRIS
8 8 8 8
8 8 8 8 8
8 8
8 8
8 8
8 8
8 8
8 ARLAND
DEWAR
ACOSTA
Appendix C
Montebello Hills Development
µ
Feet
0 250 500 1,000
Legend
Manholes
City Sewer Lines
County Sewer Lines
Montebello Hills
Parcels
8 JEFFERSON
City of Montebello
Sewer System Management Plan (SSMP) May 2025
APPENDIX E
CONDITION ASSESSMENT
WORK SCHEDULE
CCTV
CAMPO
PASEO
SIMMONS
KEENAN
BRADSHAWE
LEONARD
HENDRICKS
FINDLAY
VAL VERDE
VAL VERDE
MORRIS MORRIS
●
●
●
●
●
●
●
●
●
!!
●
●
●
●
! !
! !
●
● !!
●
●
●
!
!
●
●
●
●
●
!!
●
●
● !
!
●
! !!
●
●
●
●
●
●
●
!!
!
!
●
●
●
●
●
! !
●
●
!
!!
●
●
●
●
●
●
●
●
●
●
●
●
●
! !
●
●
!!
●
! !
●
●
●
●
●
●
●
●
● ●
●
!
!
!!
●
●
●
●
●
●
! !
● ● ●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
! ! !
! !
●
●
●
Exhibit 4
Map of CCTV'd Sewer Lines
●
●
●
●
●
●
! !
! !
●
!!
!
●
●
●
●
!
!
!
!!
! ! !
! !
!
!!
●
●
! ! ! !
!
! !
●
●
●
●
! ! ! !
! !
!
! !
! !
! !
●
! ! ! !
! !
!
! !
!
!
●
!
! !
●
●
! !
!
! !
●
! !
CAMPO
●
●
CAMPO
●
●
● POMONA
! ! ! !
●
!
!
●
●
●
! ! !
●
●
●
! !
POMONA
●
●
! ! ! !
●
●
●
●
●
●
! !
●
●
! ! ! ! !
!
! ! !
! !
! ! !
●
●
!!
! !
●
! ! !
! !
! ! !
●
! ! ! !
!
!
!
●
! !
!
!
!
● DEW!AR
!
!
! !
!
!
!
!! !
!
! !
! !
! !
! !
! ! ! !
!
!
! !
! ! ! !
!
!
!
!
! ! !
! ! !
! !
! ! ! !
●
!
!
●
●
! ! !
! !
! !
●
! ! !
●
●
! !
! !
●
● BARR ! !
●
! !
!! !
! !
●
! !
●
! ! !
●
! !
! !
! !
! !
! ! !
! ! !
! !
●
●
!
!
! !
●
! !
● ●
●
! ! ! !
! !
! !! !
! !
!
! !
! ! ! !
! ! !
●
! !
! ! ! !
!
!
!
! !
!
●
!
! !
! ! !
!
!
! ! !
! !
!
! ! ! ! ! !
!
!
!
!
!
!!
!
!
!
●
!
!
! !! !
●
!
! !
! !
! ! ! !
! !
●
!
!
!
!
● ! ! ! !
●
! ! ! !
!
!
! !!
!
!
!
! !
!
! !
●
! !
! !
●
!
! !
! ! !
! !
!
!
!
!
! !
! ! !
●
●
!
! !
!
! !! !
●
!
!
! !
! !
!!
!
AZALEA
●
●
! !
!
! !
!
! ! !
! !
!
! !
●
! ! !
●
! ! !
! !
!
! !
●
●
●
!!
!
! ! !
! !
!
!
! ! !
! ! !
! ! !
!
! !
! !
! ! ! !
!
!!
!
! ! ! ! !
! ! !
! !
!
!
● ! ! !
!
! ! ! !
! !
! !
! !
! !!
! ! !! ! ! !
●
! ! ! !
!
!
●
!
!
! ! !
!! !
! ! ! !
!
! ! !
!
! ! !
!
! !
●
!
! ! ! !
●
!
!
!
●
! !
!
! !
! !
! !
●
! !
!!!
!
! !
●
! !
!
!!
! ! !
! !
!
!
!
! !
!
!
!
! ! !
!
!
!
! ! !
●
●
●
! !
! !
! ! ! !
! !
● ●
! !
! ! !!
! !! !
! ! ! !
!
! ! !
! ! !
●
! ! ! !
! !
●
! ! ! !
! !
!
!
!
●
●
●
!! ! !
! ! !
!
! !! !
!
! !
! !
! ! ! !
! !
! ! !
! !
!!!
!
! !
!
!
!
!!
!
!
! !
!
! !
●
●
! !
!
!
!
●
●
!
!
! !
! !
●
●
! !
●
! !
! !
!
●
! !
●
!!!
!
!!
●
●
! ! !
!
!
!
!
●
OL!YMPIC !
●
!!
! ! !
!
!
!
!
! !
! !
! ! !
!
! ! !
!
! !
!
!
!
!
! !
! !
!! ! !
!
!
! !
!
!
●
●
! !
●
●
!
! !
●
●
●
! ! !
●
! !
! !
!
!
! !
●
! ! ! !
! ! !
! !
!
!
! !
●
!
!
! !
!
!
●
! !!
●
! ! ! !
! ! !
! !
! !
!
!
! !
! ! !
!
!
! !
! ! !
! ! ! !
! !
●
! ! !
!
!
● !
! !
!
●
●
●
●
! !
!
●
●
●
!
!
!
!
!
!
!
!
!
! !
!
! !
! !
●
! !
●
●
! !
●
! ! !
! !
●
! !
! !
! ! !
●
●
! !
●
●
! !
! !
! ! !
●
● ●
●
! !
! !
! ! !
●
●
! !
●
! !
!
!
!
! ! !
●
!
!
!
●
●
●
●
●
●
!
!
●
! ! !
●
●
●
! ! ! !
!
! !
! ! !
! !
! ! ! !
!
!
!
!
! ! !
●
●
! !
! ! !
!
!
! ! !
! !
!
!
! !
! !
!
!
!
! !
! !
●
! ! !
●
! !
!
! !
●
!
! !
!
!
! !
!
! !
!
!
!
! !
! !
!
! !
! ! !
! !
!
! ! ! !
●
!
!
! !
●
●
●
! !
●
●
! !
!
! !
! !
! !
! ! !
●
●
! !
●
! !
!!
●
●
!
!
!
! !
●
! !
! !
●
! !
●
●
●
●
!!
!
! !
! !
!
!
!
●
●
!!
! !
●
●
●
●
!
!
!
!
!
●
●
●
●
! !
! !
! ! !
●
! !
! !
!
! !
●
! !
!
●
●
●
●
●
POMONA
●
●
●
● ● ● ● ● ●
●
●
●
● ! !
! !
●
●
●
●
●
●
●
●
!!
●
●
●
●
●
●
●
● ●
● ●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
● ●
●
● ●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
!!
●
●
!!
●
●
!!
●
! !
●
●
●
●
●
●
●
●
●
●
●
●
! !
!
●
●
●
●
POMONA
POMONA
ACOSTA
BRADY
NORTE
SAN CLEMENTE
MORRIS
!! !
●
●
●
●
●
●
●
● BR!EVE ! ●
!!
●
●
●
●
●
●
●
●
●
●
● ●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
! !
●
●
● ●
●
●
!
!
●
●
●
●
! ! ●
●
●
!!
●
●
●
●
! !
●
●
●
●
●
●
●
●
●
●
●
●
●
● ● ! ! SAN!C!ARLO !
●
●
●
●
●
●
●
●
! !
●
●
●
●
! !
●
●
●
●
●
●
●
●
●
●
● ●
●
●
●
● ●
●
●
●
!
!
●
●
●
●
● ●
●
●
● ●
●
●
●
●
●
●
●
!!
●
●
● ● ! ! ●
●
●
! !
●
! !
●
●
●
●
●
●
●
●
! !
●
●
●
●
!!
●
●
●
! !
●
●
●
●
●
●
●
●
●
●
●
●
●
● ●
●
●
●
●
●
●
●
●
!
!
! !
●
●
●
●
●
! ! !
●
●
!
!
●
●
●
●
●
! !
●
!!
●
●
! !
● ●
!!
●
●
!
!
●
●
●
●
●
●
●
●
! !
●
●
●
●
●
●
●
●
●
●
●
●
●
!!
●
●
●
●
●
●
●
! !
●
●
●
●
●
●
●
●
● ●
! !
! !
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
! !
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
! !
●
●
!!
!!
●
! !
●
●
●
●
●
●
●
● ! !
!
●
●
●
●
●
●
●
!!
●
●
●
●
●
●
! !
●
●
! !
●
! !
●
●
!
!
●
●
! !
●
●
●
● ! !
! !
●
●
●
●
●
!
!
●
●
●
●
●
! !
●
●
●
! !
●
●
●
●
●
●
! !
●
●
●
●
●
●
●
●
● ●
● ! !
●
●
! !
●
●
● ●
●
●
●
●
●
●
●
●
●
●
●
●
!!!
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
● ●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
● ●
●
●
●
●
●
●
● ●
●
● ●
●
!!
●
●
●
● ●
● ●
! !
●
●
●
●
●
●
! ! !
! !
●
!
!
●
³
●
●
●
●
●
●
●
●
●
●
● ●
● ●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
0 2,000 4,000
Feet
Legend ● Manholes
CCTV'd Lines
Sewer Lines
Parcels
City of Montebello
Sewer System Management Plan (SSMP) May 2025
APPENDIX F
SSMP AUDIT REPORT
City of Montebello
SSMP February 2025
SEWER SYSTEM MANAGEMENT PLAN
AUDIT REPORT
February 2025
Prepared for:
City of Montebello
Department of Public Works
1600 W Beverly Blvd
Montebello, CA 90640
Prepared By:
3060 Saturn Street, Suite 250
Brea, CA 92821
714-982-5031
City of Montebello
SSMP February 2025
City of Montebello
SSMP Audit
Table of Contents
Summary....................................................................................................................................3 Introduction............................................................................................................................4 Audit of the SSMP .....................................................................................................................6
1. Goals – State Order D.13.i .................................................................................................7
2. Organization – State Order D.13.ii.....................................................................................8
3. Legal Authority – State Order D.13.iii ...............................................................................9
4. Operation and Maintenance Program – State Order D.13.iv.......................................... 10
5. Design and Performance Provisions – State Order D.13.v............................................ 12
6. Overflow Emergency Response Plan (OERP) – State Order D.13.vi............................. 13
7. Fats, Oil and Grease (FOG) Control Program – State Order D.13.vii............................. 14
8. System Evaluation and Capacity Assurance Plan (SECAP) – State Order D.13.viii .... 16
9. Monitoring, Measurement, and Program Modification – State Order D.13.ix ............... 17
10. SSMP Program Audits – State Order D.13.x................................................................. 18
11. Communication Program – State Order D.13.xi ........................................................... 19 SSMP Audit Certification ........................................................................................................ 20
SSMP Audit
3 City of Montebello
SSMP Audit
Summary
The California State Water Resources Control Board (“SWRCB”) promulgated a waste discharge requirement (“WDR”) permit on May 2, 2006 to regulate sanitary sewer systems. This permit is known as SWRCB Order No. 2006-0003, Statewide General Waste Discharge Requirements for Sanitary Sewer Systems. On July 30, 2013, Attachment A to the Order was promulgated and became effective on September 9, 2013 and is known as Attachment A, SWRCB Order No. WQO 2013-0058-EXEC, amending the Monitoring and Reporting Program for Statewide General Waste Discharge Requirements for Sanitary Sewer Systems (together these documents constitute the “SSS WDR”).
This permit, among other things, requires local public sewer collection system agencies, referred to as “Enrollees,” to develop a Sewer System Management Plan (“SSMP”).
SSMPs must be self-audited at least every two (2) years and updated every five (5) years from the original adoption date by the Enrollee’s governing board. The original SSMP must have been approved by the governing board of the Enrollee at a public meeting and adopted.
The five-year SSMP update must also be approved and certified as do all significant updates to the SSMP. The SSMP, all references in the document, and the adoption documents by the governing board must be available on the agency website or submitted to the SWRCB upon adoption or recertification. Enrollees do not send their SSMP to the State or Regional Water Boards for review or approval, but must make it publicly available, and upload an electronic copy to the SSO database or provide a link to the Enrollees’ website where the SSMP is posted.
This triennial audit of the City of Montebello’s SSMP consists of sufficiency rankings on all 11 sections of the SSMP requirements. The ranking is explained in the Audit of the SSMP section and is based on information available referenced to the WDR requirements. A total of 7 of the 11 audit elements were found to be in compliance in the sufficiency ranking with 2 elements found to be in partial compliance, 1 element in marginal compliance and 1 element in marginal and partial compliance.
The SSMP Audit Report measures compliance with the Sanitary Sewer System Wastewater Discharge Requirements (SSSWDR) Orders and the effectiveness of the City’s implementation of the current SSMP.
The findings of this audit will be used to gauge the performance of the next triennial SSMP Audit.
SSMP Audit
4 City of Montebello
SSMP Audit
Introduction
On May 2, 2006, the California State Water Resources Control Board adopted Order No. 2006-0003 (State Order) to create an equitable statewide mechanism to manage all publicly owned wastewater collection agencies with more than a mile of pipeline, to reduce the number and severity of Sanitary Sewer Overflows (SSOs), and to set up a central depository for online reporting of SSOs when they do occur. On July 30, 2013, Attachment A to the Order was promulgated and became effective on September 9, 2013 and is known as Attachment A, SWRCB Order No. WQO 2013-0058-EXEC, amending the Monitoring and Reporting Program for Statewide General Waste Discharge Requirements for Sanitary Sewer Systems (together these documents constitute the “SSS WDR”).
A principal element of the State Order is the requirement that the collection agencies adopt and maintain a management plan for the system, referred to as a Sewer System Management Plan or SSMP.
The City of Montebello, after conducting a public hearing, adopted in accordance with the State Order.
The State Order establishes the following goals:
• The SSMP must document the organization’s legal authority to achieve the goals of the SSMP as demonstrated through City of Montebello’s ordinances, agreements and other legally binding instruments.
• The SSMP must identify the City of Montebello organization and staff responsible for implementing and maintaining the SSMP.
• The SSMP is to provide a plan and schedule to properly manage, operate, and maintain all parts of the City of Montebello wastewater conveyance system.
Additionally, the State Order requires City of Montebello staff perform periodic internal audits of the SSMP focusing on evaluating the effectiveness of the SSMP and staffs’ compliance with its requirements, as shown in Section D-13 of the State Order. The internal audits must be performed at least every three (3) years with the audit report kept on file at City of Montebello.
The SSMP must be updated every six (6) years, must contain any significant program changes, and be re-certified by the City of Montebello. To complete the re-certification process, City of Montebello staff must enter the information on the Online SSO Database and mail a hard copy to the State Water Resources Control Board.
As described below, there are 11 major categories in the SSMP and over thirty-six subcategories. Additionally, a comprehensive audit program includes evaluation elements such as document control, training, objectives, data management, audit
SSMP Audit
5 City of Montebello
SSMP Audit
procedures, and results approach outcomes.
This is the internal audit of the SSMP. No action is required by the City of Montebello.
After reviewing and sharing the contents of the audit report, staff will create a list of proposed remedies if deficiencies were found to exist, file the report, and begin working to correct the deficiencies, if any.
SSMP Audit
6 City of Montebello
SSMP Audit
Audit of the SSMP
As specified in the State Order, the SSMP is comprised of eleven (11) sections or subsets of Section D. 13 of the State Order, as follows:
Element 1 - D.13.i Goals
Element 2 - D.13.ii Organization
Element 3 - D.13.iii Legal Authority
Element 4 - D.13.iv Operation and Maintenance Program
Element 5 - D.13.v Design and Performance Provisions
Element 6 - D.13.vi Overflow Emergency Response Plan
Element 7 - D.13.vii FOG (fats, oils, grease) Control Plan Element 8 - D.13.viii System Evaluation and Capacity Assurance Plan Element 9 - D.13.ix Monitoring, Measurement and Program Modifications Element 10 - D.13.x SSMP Program Audits
Element 11 - D.13.xi Communication Program
This internal audit is focused on the above eleven categories as required by the State Order. Compliance ranking has been based on State Order audit guidelines and sufficiency. A recommendation has been provided when there is enough information to support it.
The format for audit reporting is as follows:
• State Order Section/Subsection
• Sufficiency Ranking
Ranking Ranking Basis
In Compliance All requirements specified in the section are met.
Substantial Compliance The majority of requirements, with the exception of one or two are met.
Partial Compliance Half of the requirements stated are met.
Marginal Compliance Less than half of the requirements are met.
Not in Compliance None of the requirements are met.
• Findings
• Reference Information
• Recommendation when appropriate
SSMP Audit
7 City of Montebello
SSMP Audit
1. Goals – State Order D.13.i
Review the SSMP to determine if it complies with the State Order by having a goal to provide a plan to manage, operate, and maintain all parts of the City of Montebello System.
Sufficiency: In Compliance
Findings: The City of Montebello has established a list of goals in its SSMP that complies with the goals established in the State Order and are as follows;
1. Minimize sanitary sewer overflows;
SSMP will help reduce SSO’s by being properly operated, maintained and managed to reduce frequency and severity of SSO’s and their potential impacts on public health, safety and the environment.
2. Prevent public health hazards;
SSMP guidelines helps mitigation and impact of SSO’s. No Spill Reports reported in 2015 thru May 2019.
3. Minimize inconveniences by handling interruptions in service; All SSOs and mitigation are documented as part of SSMP and reporting requirements. When an SSO occurs, prompt action in taken to identify, contain, and remove the cause; report the event to the appropriate regulatory authorities; and notify the public in a timely manner.
4. Maintaining adequate capacities and extending useful life of the collection system; The source of funding for CIP is provided thru the fees, property taxes, connection fees and bonds.
5. Prevent unnecessary damage to public and private property; When an SSO occurs, the overflow of sewage is stopped as soon as possible and public access is limited to the overflow area to prevent public contact with any wastewater contamination.
6. Efficient use of funds for sewer operations;
The SSMP states that the City has a program that consists of sewer line cleaning and maintenance program, which includes CCTV and other mechanisms to detect I/I. The City has established a financial plan to ensure capital replacement or rehabilitation of sewer lines prone to I/I. The source of funding for CIP is provided thru user fees, property taxes, connection fees and bonds.
7. Convey wastewater to treatment facilities with a minimum of infiltration, inflow and ex filtration;
Per City Sanitary Sewer Master Plan in 2011, City staff regularly evaluates system capacities and periodic flow monitoring of key conveyance systems.
8. Provide adequate capacity to convey peak flows;
The source of funding for CIP is provided thru user fees, property taxes,
SSMP Audit
8 City of Montebello
SSMP Audit
connection fees and bonds.
9. Perform all operations in a safe manner;
The City of Montebello’s staff routinely performs operations in a safe manner, holds regular monthly mandatory training meetings and regularly reviews safety procedures in order to avoid personal injury or property damage.
10.Implement regular, proactive maintenance of the system to remove roots, debris, and fats, oils and grease in areas prone to blockages that may cause sewer backups or SSOs;
The City of Montebello regularly maintains areas prone to blockage in order to avoid sewer backups or SSOs. Additionally, the City provides regular public outreach in regards to proper disposal of fats, oils and grease.
11.Uphold the City’s Standards and Specifications on newly constructed public and private sewers:
City staff regularly evaluates current standards and specifications and ensures that they are upheld on all newly constructed public and private sewers.
Reference: City of Montebello 2019 SSMP
Recommendation: None. The City of Montebello is in compliance with the Goals requirement of the State Order.
2. Organization – State Order D.13.ii
Review the SSMP to determine if it complies with the State Order by having the names of authorized representatives published and updated in the SSMP.
Sufficiency: In Partial Compliance
Findings: The City of Montebello identified and kept updated the names of its authorized representative, management, administration, and maintenance personnel and has shown the chain of communication for reporting SSOs. Organizational Changes and the process of who to report to has changed since the 2019 SSMP and will need to be updated.
Reference: City of Montebello Organizational Chart for Sanitary Sewer Management, City of Montebello SSMP, Description of General Responsibilities, City’s SSO Reporting Procedures Flow Chart, City’s Contact Directory for SSO Responding and Reporting.
Recommendation: Update needed. The City of Montebello’s Organization and Chain of Command is a “flow chart” being updated. The City of Montebello’s general maintenance and emergency maintenance is now being contracted and performed by Los Angeles County Consolidated Sewer Maintenance District.
SSMP Audit
9 City of Montebello
SSMP Audit
3. Legal Authority – State Order D.13.iii
Review the SSMP to determine if it complies with the State Order by having ordinances and agreements in place and updated to prevent illicit discharges, provide for proper design of upstream facilities, provide right of way and access to the system, and enforce City regulations.
Sufficiency: Partial Compliance
Findings: The City of Montebello currently has in place several municipal codes which prevent, require, ensure, limit and enforce specific features and operations required by the Order. The City of Montebello SSMP currently lists the applicable City codes that provide the proper legal authority.
The following are requirements are referenced in the SSMP:
1) The necessary legal authority will prevent illicit discharges into its sanitary sewer system:
The City’s ordinance Title 8, Section 36.030 prohibits the illicit discharges, dumping, and non-storm water discharges into storm water drains. Any person causing an illicit discharge may be required to pay for the cost of clean-up and remediation and Title 8, Section 36.140 which allows criminal penalties for any violations of the Sewer and Industrial Waste Ordinances. Violations for an infraction can be convicted under City Ordinance 8.32.050.
2) Require that sewers and connections be properly designed and constructed:
The City has the responsibility for the review and approval of plans and specifications for the construction and dedication of sanitary sewers, house laterals and sewerrelated appurtenances through the development processes of the Department of Public Works, Development Engineering Division based on the 2019 SSMP. LA County Code Title 20 is utilized for design and construction of new house laterals and construction of collection system. Since the 2019 SSMP, the ownus for overseeing and approving design and construction of connections and sewers is now Community Development.
3) Ensure access for maintenance, inspection, or repairs for portions of the lateral owned or maintained by the Public Agency:
The City Code, 12.02.280 gives the city the legal right to set requirements to allow unrestricted maintenance access to the public sewer collection system located in the easements. Per the 2019 SSMP, an easement agreement has not been established for any portion of the lateral owned outside of the easement. 4) Limit the discharge of Fats, Oils, Grease (FOG) and other debris that may cause
SSMP Audit
10 City of Montebello
SSMP Audit
blockages.
The City by adopting the California Plumbing Code per Section 15.20.010 of the City Municipal Code and LA County Code, Title 20 to be adopted by the City, has the legal authority to satisfy this element of the WDR. The City is planning to adopt it’s own language for an enforceable FOG program in 2025 SSMP. 5) Enforce any violation of its sewer ordinances.
Violations for an infraction can be convicted under City Ordinance 8.32.050. The City Director of Public Works is empowered to enforce all the requirements in Division 2 – Sanitary Sewers and Industrial Waste of the LA County Code and in accordance with Section 20.24.110 of the Code may delegate this authority. The LA County Code, Section 20.24.160 allows criminal penalties for any violations of the Sewer and Industrial Waste Ordinances.
Illicit discharges are addressed in the City of Montebello Municipal Code and found on the City Website:
https://www.municode.com/library/ca/montebello/codes/code_of_ordinances Reference: Legal Authority, City of Montebello SSMP. List of additional City of Montebello Ordinances.
Recommendation: The City of Montebello is in compliance with the Legal Authority requirement of the State Order. However, adopting a FOG program specific for the City of Montebello is being considered working in parallel with updated SSMP.
4. Operation and Maintenance Program – State Order D.13.iv Review the SSMP and activities of staff, consultants and contractors to determine compliance with the State Order by having (a) an up to date collection system map that shows all pipe reaches, manholes, siphons, diversion structures, and pump stations, if any, (b) a routine preventative maintenance program and operations program, (c) rehabilitation and replacement program, (d) operations and maintenance training program, and (e) part inventory program including identification of critical replacement parts.
Sufficiency: In Compliance
Findings: According to the 2019 SSMP, The City of Montebello maintains the sewer system. This will be updated in the next SSMP as the City now contracts the maintenance to the Los Angeles County Consolidated Sewer Maintenance District.
SSMP Audit
11 City of Montebello
SSMP Audit
1) Collection System Mapping
The City of Montebello maintains as-built plans and City Sanitary Sewer Master Plan of the City’s sewer facilities. Data on the plans, such as system location and alignment, pipe material, size, etc., are also stored in the SMD Computer Aided Design Drafting (CADD) system. Information generated by the CADD is printed on Index Map Sheets stored by the City Public Works Department Engineering Division.
These maps are kept at the City Public Works Department, Field Yards. The maps are updated, as necessary, to reflect changes in the system. 2) Resources and Budget
The source of funding for Capital Improvement Program (CIP) is provided thru user fees, property taxes, connection fees and bonds. The CIP is a work in progress as before the program can be identified, the entire system needs to be videotaped and rated.
3) Prioritized Preventative Maintenance
According to the 2019 SSMP, the City is responsible for operation and maintenance of its collection sewer system. The Operation and Maintenance Program has been developed to provide the tools and procedures for maintaining its gravity sewer system, and the City hired sewer contractors possessing adequate knowledge, skills and abilities. The sewer contractors hired by the City will provide after hour services to the City such as Stand-by, callback, and other sewer emergency services. 4) Scheduled Inspections and Condition Assessments
The interior and exterior of manholes are inspected semi-annually for any structural defects, sewage flow condition, presence of vermin or rodents, deleterious industrial waste, odors and any signs of unusual settlement around the manholes and along sewer alignments. Gas traps, manholes and siphons are inspections and cleared of any stoppages or flow restrictions monthly. Sewer lines are cleaned by hydro jet or rodding. Frequency of cleaning is based on inspection records. Sewer lines known to accumulate grease, garbage grinds or sand are put on monthly, quarterly, or semiannual cleaning schedule and those prone to root growth are periodically rodded or chemically treated. City work orders are generated and tracked by the Maintenance Management System (MMS). City field crews activities are recorded in various forms such as service requests, cleaning reports, sewer maintenance daily reports, manhole adjustments, overflow report forms etc. and finally stored in the MMS. 5) Contingency Equipment and Replacement Inventory
The equipment utilized in the maintenance of the City’s sewer facilities is owned by the City contractor. The Contractor has full responsibility for the maintenance and replacement of equipment.
SSMP Audit
12 City of Montebello
SSMP Audit
6) Training
The City’s staff is trained on wastewater operations and maintenance policies, procedures, safety policies and equipment. The Director of Public Works is responsible for documenting the details of each training including dates, content, and participating employees.
7) Outreach to Plumbers and Building Contractors
The City’s construction projects are awarded to carefully selected contractors with well trained and qualified personnel for any given project.
Reference: High Maintenance Sewer Lines, Sanitary Sewer Master Plan 2011, City of Montebello SSMP, Capital Improvement Program, City of Montebello SSMP.
Recommendation: Beginning July 2021, the City retained the Los Angeles County of Public Works for Annual Sewer Maintenance Services to be provided by the Los Angeles County Consolidated Sewer Maintenance District. This contract has been renewed and the Consolidated Sewer Maintenance District now provides maintenance, repairs and infrastructure capital projects. Following this audit, the contract’s maintenance, repair and infrastructure projects will be evaluated for effectiveness.
5. Design and Performance Provisions – State Order D.13.v Review the SSMP to determine if it complies with the State Order by having design and construction standards and specifications for installation of new facilities, including coverage for testing of new facilities prior to acceptance.
Sufficiency: In Compliance
Findings: The SSMP contains reference to the City of Montebello’s Standards and Specifications for new or upgrading facilities, placing the element in compliance. The City requires that all sewers be designed in accordance with Los Angeles County standards.
The LA County DPW has Standard Plans and Specifications for Construction of Sanitary Sewers and appurtenances to insure that sewer lines and connections are properly designed and constructed. The County DPW specifications by reference incorporate the Standard Plans and Specifications for Public Works Construction (Green Book), Special Provisions, and Standard Drawings. The City requires that these publications also be followed in the design of sewer system within the City.
Reference: City of Montebello Standard Plans and Specifications Design Requirements for Sewage Collection Systems, City of Montebello SSMP, Pumping Station Design
SSMP Audit
13 City of Montebello
SSMP Audit
Criteria and Los Angeles Sanitary Sewer Standard Plans.
Recommendation: None. The City of Montebello is in compliance with the requirement of this State Order.
6. Overflow Emergency Response Plan (OERP) – State Order D.13.vi Review the SSMP to determine if it complies with the State Order by having an overflow emergency response plan that includes (a) proper notification procedures, (b) a program that assures proper response to all overflows, (c) procedures that ensure prompt notification of regulatory agencies and other affected entities, (d) proper training for staff and contractors named in the response plan, (e) procedures to address traffic control and crowd control, and, (f) implementation of steps to prevent SSOs from reaching waters of the United States.
Sufficiency: In Compliance
Findings: The City of Montebello SSMP currently complies with all requirements of this State Order.
a) Proper notification procedures so that primary responders and regulatory agencies are informed of all SSOs in a timely manner
b) Program to ensure appropriate response to all overflows c) Procedures to ensure prompt notification to appropriate regulatory agencies and other potentially affected entities
d) Procedures to ensure that appropriate staff and contractor personnel are aware of and follow the Emergency Response Plan and are appropriately trained e) Procedures to address emergency operations, such as traffic and crowd control and other necessary response activities
f) A program to ensure that all reasonable steps are taken to contain the discharge of untreated and partially treated wastewater to the waters of the United States and to minimize or correct any adverse impact on the environment resulting from the SSOs
From May 4, 2015 to May 20, 2019, there were zero (0) SSOs within the City of Montebello service area per SSO incident Map and summary pages available at the State Water Resources Control Board web site:
https://ciwqs.waterboards.ca.gov/ciwqs/readOnly/PublicReportSSOServlet? Regional: 0 SSO
SSMP Audit
14 City of Montebello
SSMP Audit
Reference: Sanitary Sewer Overflow Emergency Response Plan, City of Montebello SSMP, SSO Field Response Flow Chart, SSO Complaint Form, City of Montebello SSMP Operator Sewage Spill Report.
Recommendation: The City of Montebello is in compliance with the requirement of this State Order. The written procedures are required to ensure City staff and contract personnel are aware of the OERP and written procedures to address emergency operations, traffic control, and other necessary response activities shall be provided.
A Legally Responsible Official (LRO) was registered to report into CIWQS online SSO Database all spills.
7. Fats, Oil and Grease (FOG) Control Program – State Order D.13.vii Review the SSMP to determine if it complies with the State Order by having a FOG Control plan with (a) a public education element, (b) FOG disposal facilities identified, (c) ordinances, rules and regulations to prevent FOG, (d) requirements to install FOG traps together with standard drawings for traps, owner maintenance requirements, owner record keeping requirements and owner reporting requirements, (e) inspection authority and staffing, (f) identification of sanitary sewer sections impacted by FOG, and (g) a source control plan for NRWS reaches currently impacted by FOG.
Sufficiency: Not In Compliance
Findings:
a) In 2018 the City developed a FOG control program; however, it was not approved by City Council. The City does have a public outreach program for proper disposal of FOG and other SSO prevention measures such as installation of backwater valves, hose lateral maintenance, etc. is disseminated to City residents through publication of Annual Reports, brochures and individual notices of property owners.
b) The 2019 SSMP supplies a list of vendors which offer collection and disposal services on the www.calfog.org website. Food services establishments (FSEs) are annually inspected for FOG disposal compliance during FOG inspections. c) The City of Montebello’s SSMP details the proper disposal of FOG waste as detailed by ordinance of Los Angeles County’s Environmental Health Department. d) As a result, the SSMP details the City Municipal Codes and County Ordinances that grant authority to; limit types of waste discharged to public sewers, installation of grease interceptors in accordance to Los Angeles County standards, require routine inspections, and maintenance of grease interceptors.
SSMP Audit
15 City of Montebello
SSMP Audit
e) The SSMP details the construction and maintenance standards as set forth by Los Angeles County.
f) The Inspection of grease interceptors is handled by Los Angeles County’s environmental health department.
g) An identification of sewer system sections subject to FOG blockages and establish a cleaning maintenance schedule on monthly, quarterly, or semi-annual periodic cleaning schedule.
Reference: Legal Authority, City of Montebello SSMP, Grease Removal Devices Recommendation: The City of Montebello is marginally in compliance with the requirement of this State Order. The City needs to conduct an investigation of “hot spots” caused by FOG, contain a public education element and enforce FOG program requirements.
The City proposed a FOG control program which was not adopted. The FOG program needs to consist of focused cleaning and maintenance as well as source control. The following subsections discuss identification and cleaning of grease-prone areas, legal authority to prohibit grease discharge or require a grease removal device, facility inspection and public outreach. Areas with several restaurants or grease-producing facilities should be considered likely grease problem areas. SSOs caused by grease should be investigates in food service establishments, high density multi-family dwellings, single family dwellings and food manufacturing facilities. The following is a list of projects that can be developed utilizing a sewer system GIS to inventory and characterize potential sources of FOG:
• Develop a GIS application for the identification of sewer system blockages due to FOG and their potential sources including the following:
• Identify and color code sewer collection lines subject to blockage • Identify and plot all SSOs resulting from FOG blockages. If the source of the grease in a lateral can be identified, the City needs to contact the property owner to notify them of the problem and work with them to clean the lateral. • Perform inspection activities for the grease producing facilities, enforcement authorities, and whether the City has sufficient staff to inspect and enforce the FOG ordinance.
SSMP Audit
16 City of Montebello
SSMP Audit
8. System Evaluation and Capacity Assurance Plan (SECAP) – State Order D.13.viii
Review the SSMP to determine if it complies with the State Order by having a Capital Improvement Plan (CIP) that considers (a) Evaluation of those portions of the system that is experiencing SSO discharges due to hydraulic deficiency, (b) Design Criteria commensurate with the system, (c) Capacity Enhancement Measures and steps to address short term and long term CIP goals and an implementation schedule, and (d) Schedule for completion of the necessary things-to-do that were developed in items D.13.viii (a) - (c) above.
Sufficiency: Marginal Compliance
Findings: During the 2011 Sanitary Sewer Master Plan, the system was evaluated, and upgrades were recommended based on these results. The following were addressed in the 2019 SSMP:
1) Evaluation: Action needed to evaluate portions of the Sanitary Sewer System that are experiencing or contributing to an SSO discharge caused by hydraulic deficiency.
The City Public Works Department Engineering Division is responsible for ensuring that the public sewer infrastructure is correctly designed, adequately sized and easily maintainable. Public Works Utilities Division also provides a supportive role in reviewing all proposed sewer plans for new developments in the City to ensure that they conform to County design standards and particularly to ensure that LA County Sanitation District’s requirements for acceptability of treatment. 2) Design Criteria: Where design criteria do not exist or are deficient, undertake the evaluation to establish appropriate design criteria.
The City’s Public Works Department Engineering Design Guidelines and Sanitary Sewer Master Plan establish design guidelines for private development and public projects within the City of Montebello. The Sewer Master Plan identifies design criteria for new sewer systems including flow factors, peaking factors, hydraulic friction factors, minimum slopes, and maximum allowable depth of flow.
3) Capacity Enhancement Measures: The steps needed to establish a long-term CIP to address identified hydraulic deficiencies including prioritization, alternatives analysis, and schedules.
The collection system capacity enhancement program is a combined effort of City Public Works Engineering Division. The City programs to optimize the use of available sewer capacity and preventing SSO include the CCTV program to identify pipe segments needing repair or with I/I or tree root intrusion problems, sewer cleaning program and
SSMP Audit
17 City of Montebello
SSMP Audit
the CIP program to effect repairs or replacement of damaged pipes. 4) Schedule: Develop a schedule of completion dates for all portions of the CIP to be reviewed and updated consistent with the SSMP audit and update.
The 2011 Sanitary Sewer Master Plan includes recommended completion dates and fees for the various phases of replacement and rehabilitation. The Engineering Department reviews the CIP on an annual basis and adjusts if necessary to address the most critical issues.
Reference: City of Montebello hydraulic model per Sanitary Sewer Master Plan in 2011, City of Montebello SSMP and Sewer CIP.
Recommendation: City of Montebello needs to CCTV video entire system and create new CIP and Sanitary Sewer Master Plan to reflect short and long term capital improvement projects. All mapping and fee structure needs to be updated in the Master Plan.
9. Monitoring, Measurement, and Program Modification – State Order D.13.ix
Review the SSMP to determine if it complies with the State Order by (a) maintaining relevant information that can be used to establish and prioritize appropriate SSMP activities, (b) monitoring the implementation and, where appropriate, measure the effectiveness of each element of the SSMP, (c) assessing the success of the preventative maintenance program, (d) updating program elements, as appropriate, based on monitoring or performance evaluations, and (e) identifying and illustrating SSO trends, including frequency, location and volume.
Sufficiency: Partial Compliance
Findings:
1) Maintain the relevant information that can be used to establish and prioritize SSMP activities
The SSMP committed to stating that the City will document all relevant data on SSOs that occur in the City including quarterly SSO reports form City PWD, Annual Reports published by the city, Sewer Maintenance Productivity Report and any special reports to regulatory agencies.
2) Monitor the implementation and, where appropriate, measure the effectiveness of each element of the SSMP
The evaluation of the City’s SSMP program effectiveness shall be based on key performance indicators of: total number of overflows, overflow response time, reduction in repeated incidents of SSO at same location, total overflows equal to or greater than
SSMP Audit
18 City of Montebello
SSMP Audit
1,000 gallons or reaching the waters of the United States and reduction in number or overflows that are caused by capacity-related problems. 3) Assess the success of the preventative maintenance program Continually updating or modifying the key elements based on the results of monitoring and responding to SSOs will show the effectiveness of the SSMP. The City shall also make recommendations as necessary to be adjusted or revised within the City boundaries to better serve its residents.
4) Update program elements, as appropriate, based on monitoring or performance evaluations
Monitoring and performance standards are annually evaluated by the Public Works Director and any improvements or modifications to the SSMP program elements are noted and implemented as soon as practical.
5) Identify and illustrate SSO trends including frequency, location and volume The mapping of SSO frequencies are presented in monthly numbers of charts and graphs prepared by the City. The graphs are used to identify SSO trends and evaluate overall program effectiveness. Indicators from these graphs are used as indicators of possible I/I issues and evaluated annually as part of the performance parameters of the SSMP.
Reference: City of Montebello 2019 SSMP
Recommendation: The City of Montebello is in partial compliance with the requirement of this State Order. The City sewer maps shall be regularly updated with every sewer collection system change as often as necessary. A schedule and formal maintenance program for manhole inspections, sewer line cleaning, CCTV inspections shall be fulfilled.
Records to assist in the evaluation of SSMP implementation should be further developed and improved upon.
10. SSMP Program Audits – State Order D.13.x
As a part of the SSMP, City shall conduct periodic audits. At a minimum these audits must occur every three years and a report must be prepared and kept on file. These audits shall focus on the effectiveness of the SSMP, compliance with State Order requirements, identification of any deficiencies and steps to correct them.
Sufficiency: In Compliance
Findings: The City of Montebello has embarked on this audit of its SSMP with timeliness to allow the auditor adequate time to investigate, gather evidence, analyze and then report sufficiency and findings, and finally, to make recommendations when appropriate.
SSMP Audit
19 City of Montebello
SSMP Audit
The City has conducted the current the SSMP Audit and concurrent SSMP Audit Report at a minimum of every three years and will continue to do so for the next three year deadline occurring in 2028.
Reference: City of Montebello May 2019 SSMP audit
Recommendation: Re-certification of the SSMP is required when significant updates to the SSMP are made. Updates are required every 6 years at a minimum.
The SSMP must be re-certified every 6 years and after updating the SSMP with elements recommended by the 2019 audits together with any program changes.
11. Communication Program – State Order D.13.xi
Review the activities of staff to determine if they have complied with the State Order by (a) communicating the performance of the SSMP with the public, and (b) providing the public and the Los Angeles County Sanitation District the opportunity to provide input.
Sufficiency: In Compliance
Findings: State Order requirements are complex and developing the first SSMP required comments and input from many stakeholders. After the adoption, the SSMP was filed with the City of Montebello for public review. As noted in the State Order, the SSMP Audit is the mechanism to be used to measure SSMP performance and the best document for communicating performance.
Interested parties and the public will have an opportunity to provide input with the completion of each audit every three years and certification every six years as required by the Brown Act (public notice requirements).
Reference: City of Montebello SSMP
Recommendation: It is recommended after each audit that; City staff develop an implementation plan to address any deficiencies identified during the audit. Progress can then be acknowledged with the next audit or certification with the completion of each audit.
City staff will share the audit findings with interested parties and make the report available to the public by posting on the City’s website.
City of Montebello
Sewer System Management Plan (SSMP) May 2025
APPENDIX G
SPILL REPORT PROCEDURES
YEARLY SMD WORK REPORTS
Colorado River Basin Regional Water Quality Control Board
SPILL REPORTING PROCEDURES
MANDATORY PROCEDURES AND REQUIREMENTS
FOR ADDRESSING SPILLS AND OTHER
UNAUTHORIZED DISCHARGES FROM MUNICIPAL
WASTEWATER TREATMENT PLANTS
To protect the public and the environment, pursuant to California Water Code (CWC) Section 13267 and 13383, the Colorado River Basin Regional Water Quality Control Board (Regional Water Board) has established mandatory procedures for handling spills from publicly owned wastewater treatment works (POTWs). These procedures are in addition to existing requirements of your National Pollutant Discharge Elimination System (NPDES) Permit and/or Waste Discharge Requirements, and do not preclude any emergency notification requirements mandated by other regulatory agencies or Federal/State law. Non-compliance with these reporting requirements is subject to potential civil liability according to CWC Section 13268.
These reporting requirements are necessary to ensure proper compliance with your waste discharge requirements and to collect needed information regarding discharges of sewage or other waste that could affect the quality of waters of the state. As the owner of a POTW, your agency is responsible for providing this information pursuant to Water Code sections 13267 and 13383.
WHAT IS A SPILL?
A spill is any spilling, leaking, pumping, pouring, emitting, emptying, discharging, injecting, escaping, leaching, dumping, or disposing into surface waters or drainage channels that is not permitted or authorized by a regulatory agency. (A spill includes an unauthorized discharge to land that poses a public health threat.) WHAT IS THE REQUIRED REPORTING?
In accordance with the requirements of Health and Safety Code section 5411.5, the discharger shall provide notification to the local health officer or the director of environmental health with jurisdiction over the affected water body of any unauthorized release of sewage or other waste that causes, or probably will cause, a discharge to any waters of the state.
In accordance with the requirements of Water Code section 13271, the discharger shall provide notification to the Office of Emergency Services of the release of reportable amounts of hazardous substances or sewage that causes, or probably will cause, a
discharge to any waters of the state. The California Code of Regulations, Title 23, section 2250, defines a reportable amount of sewage as being 1,000 gallons. The phone number for reporting these releases to the Office of Emergency Services is (800) 852-7550.
POTWs that experience a spill must follow the reporting procedures listed below:
1. NOTIFICATION
Within two (2) hours after becoming aware of a spill, you must notify by telephone the Office of Emergency Services (OES) at (800) 852-7550, the local health department, and your Regional Water Board office at (760) 346-7491. The OES will provide you with a control number for further reference of the subject spill. If the telephone report is made to the Regional Water Board office after normal business hours, leave a message regarding the spill. OES will make any necessary afterhours contact with Regional Water Board staff.
At a minimum, the following information shall be provided to the Regional Water Board:
(a) The location, date, and time of the release.
(b) The water body that received or will receive the discharge. (c) An estimate of the amount of sewage or other waste released and the amount that reached a surface water at the time of notification. (d) If ongoing, the estimated flow rate of the release at the time of the notification. (e) The name, organization, phone number and email address of the reporting representative.
2. CERTIFICATION
As soon as possible, but not later than twenty four (24) hours after becoming aware of an unauthorized discharge of sewage or other waste from its wastewater treatment plant to a water of the state, the discharger shall submit a statement to the Regional Water Quality Control Board by email at
[email protected] . If the discharge is 1,000 gallons or more, this statement shall certify that the State Office of Emergency Services has been notified of the discharge in accordance with Water Code section 13271. The statement shall also certify that the local health officer or director of environmental health with jurisdiction over the affected water bodies has been notified of the discharge in accordance with Health and Safety Code section 5411.5. The statement shall also include at a minimum the following information:
(a) Agency, NPDES No., Order No., if applicable.
(b) The location, date, and time of the discharge.
(c) The water body that received the discharge.
(d) A description of the level of treatment of the sewage or other waste discharged. (e) An initial estimate of the amount of sewage or other waste released and the amount that reached a surface water.
(f) The Office of Emergency Services control number and the date and time that notification of the incident was provided to the Office of Emergency Services. (g) The name of the local health officer or director of environmental health representative notified (if contacted directly); the date and time of notification; and the method of notification (e.g., phone, fax, email).” Should there be any conflict between the existing reporting requirements contained in the Monitoring and Reporting Program (MRP) or corresponding orders and this modification, the modification will prevail. All other provisions of your MRP remain in full force and effect.
3. REPORTING
Within five (5) business days, you must submit a written report to the Regional Water Board office documenting the above information. Your report must also include any additional details gathered and copies of reports submitted to other agencies.
SPILL REPORTING FACT SHEET
To be posted at facility
WHEN A SPILL OCCURS YOU MUST FOLLOW THE MANDATORY PROCEDURES IN THE TABLE BELOW:
What is a spill? A spill is any spilling, leaking, pumping, pouring, emitting, emptying, discharging, injecting, escaping, leaching, dumping, or disposing into surface waters or drainage channels that is not permitted or authorized by a regulatory agency. (A spill includes an unauthorized discharge to land that poses a public health threat.) Be on the safe side, REPORT IT! Required
Communication
Agency to
Contact (all
are required)
Time Requirements Contact Method
1. Notification Office of
Emergency
Services (OES)
As soon as possible,
but no later than 2
hours after becoming
aware of the
unauthorized
discharge.
Telephone – (800) 852-
7550 (obtain a control
number from OES)
1. Notification Local Health
Department
(LHD)
As soon as possible,
but no later than 2
hours after becoming
aware of the
unauthorized
discharge.
Telephone (call city or
county Environmental
Health Department) Fill
in your local health
Department Phone #s
1. Notification Regional Water
Board
As soon as possible,
but no later than 2
hours after becoming
aware of the
unauthorized
discharge.
Telephone
(760) 346-7491
2. Certification Regional Water
Board
As soon as possible,
but no later than 24
hours after becoming
aware of the
unauthorized
discharger
Telephone – (760) 346-
7491 (be prepared to
provide detail
information1
3. Reporting Regional Water
Board
Within 5 Business
days, submit written
report
Mail or Hand Delivery
1 See Spill Reporting Procedure Document
Overflow Emergency Response Plan
Appendix 6-G Methods for Estimating Spill Volume
A variety of approaches exist for estimating the volume of a sanitary sewer spill. This appendix documents the three methods that are most often employed. The person preparing the estimate should use the method most appropriate to the sewer overflow in question and use the best information available.
Method 1 Eyeball Estimate
The volume of small spills can be estimated using an "eyeball estimate". To use this method imagine the amount of water that would spill from a bucket or a barrel. A bucket contains 5 gallons and a barrel contains 50 gallons. If the spill islarger than 50 gallons, try to break the standing water into barrels and then multiply by 50 gallons. This method is useful for contained spills up to approximately 200 gallons.
Method 2 Measured Volume
The volume of most small spills that have been contained can be estimated using this method. The shape, dimensions, and the depth of the contained wastewater are needed. The shape and dimensions are used to calculate the area of the spills and the depth is used to calculate the volume.
Common Shapes and Dimensions
RECTANGLE CIRCLE TRIANGLEc
ti.
◄
LENGTH ..I
I
I
I
1 T
tiI
BASE
Step 1 Sketch the shape of the contained sewage (see figure above).
Step 2 Measure or pace off the dimensions.
Step 3 Measure the depth atseveral locations and select an average.
Step 4 Convert the dimensions, including depth, to feet.
Step 5 Calculate the area in square feet using the following formulas:
Rectangle: Area= length (feet) x width (feet)
Circle:
Triangle:
Area= diameter (feet) x diameter (feet) x 0.79
Area= base (feet) x height (feet) x 0.5
Step 6 Multiply the area (square feet) times the depth (in feet) to obtain the volume in cubic feet.
Step 7 Multiply the volume in cubic feet by 7.5 to convert it to gallons Method 3 Duration and Flowrate
Calculating the volume oflarger spills, where it is difficult or impossible to measure the area and depth, requires a different approach. In this method, separate estimates are made of the duration of the spill and the flowrate. The methods of estimating duration and flowrate are:
D11ratioll: The duration is the elapsed time from the time the spill started to the time that the flow was restored.
Start Time: The start time issometimes difficult to establish. Here are some approaches:
• Local residents can be used to establish start time. Inquire as to their observations. Spills that occur in rights-of-way are usually observed and reported promptly. Spills that occur out of the public view can go on longer. Sometimes observations like odors or sounds (e.g. water running in a normally dry creek bed) can be used to estimate the start time. • Changes in flow on a downstream flowmeter can be used to establish the start time. Typically the daily flow peaks are "cut off' or flattened by the loss of flow. This can be identified by comparing hourly flow data during the spill event with flow data from prior days. • Conditions at the spill site change over time. Initially there will be limited deposits of toilet paper and other sewage solids. After a few days to a week, the sewage solids fonn a light-colored residue.
After a few weeks to a month, the sewage solids tum dark. The quantity of toilet paper and other materials of sewage origin increase over time. These observations can be used to estimate the start time in the absence of other information. Taking photographs to document the observations can be helpful if questions arise later in the process.
• It is important to remember that spills may not be continuous. Blockages are not usually complete (some flow continues). In this case the spill would occur during the peak flow periods (typically 10:00 to 12:00 and 13:00 to 16:00 each day). Spills that occur due to peak flows in excess of capacity will occur only during, and for a short period after, heavy rainfall.
E11d Time: The end time is usually much easier to establish. Field crews on-site observe the "blow down" that occurs when the blockage has been removed. The "blow down" can also be observed in downstream flowmeters.
Flowrate: The flowrate is the average flow that left the wastewater collection system during the time of the spill.
There are three common ways to estimate the flowrate:
• The San Diego Manhole Flowrate Chart: This chart, included as Appendix 6-F, shows sewage flowing from manhole covers at a variety of flowrates. The observations of the field crew can be used to select the appropriate flowrate from the chart. If possible, photographs are useful in documenting the basis for the flowrate estimate.
• Flowmeter: Changes in flows in downstream flowmeters can be used to estimate the flowrate during the spill.
• Counting Connections: Once the location of the spill is known, the number of upstream connections can be determined from the sewer maps. Multiply the number of connections by 200 to 250 gallons per day per connection or 8 to 10 gallons per hour per connection.
For example:
22 upstream connections x 9 gallons per hour per connection = 198 gallons per hour/ 60 minutes per hour
= 3.3 gallons per minute
Spill Volume: Once duration and flowrate have been estimated, the volume of the spill is the product of the duration in hours or days and the flowratc in gallons per hour or gallons per day.
For example:
Spill start time = I I:00
Spill end time = 14:00
Spill duration = 3 hours
3.3 gallons per minute x 3 hours x 60 minutes per hour
= 594 gallons
California Home Friday, April 25, 2025
California Integrated Water Quality System Project (CIWQS) Spill Public Report – Summary Page
The information on this summary page is the result of your search. These results correspond to the following search criteria:
SEARCH CRITERIA: [REFINE SEARCH]
WDID (4SSO10411)
County (Los Angeles)
Spill Type (Category 1; Category 2; Category 3))
Start Date (01/01/2020)
End Date (04/24/2025)
The information in this table does not include Category 4 spills, as defined in the Statewide Sanitary Sewer Systems General Order 2022-0103-DWQ ( https://www.waterboards.ca.gov/board_decisions/adopted_orders/water_quality/2022/wqo_2022-0103-dwq.pdf ).
More information about the Spill Public Report is found at the bottom of this page. [VIEW PRINTER FRIENDLY VERSION] [EXPORT THIS REPORT TO EXCEL] [EXPORT ALL SPILL DETAILS TO EXCEL] Region
Responsible
Agency
Sanitary
Sewer
System WDID
Total
Number
of
Spills
Total
Volume
of
Spills
(gal)
Total
Volume
Recovered
(gal)
Total
Volume
Reached
Surface
Water
(gal)
Percent
Recovered
(%)
Percent
Reached
Surface
Water
(%)
Miles of
Pressure
Sewer
Miles
of
Gravity
Sewer
Miles of
Laterals
Number
of
Pump
Stations
4 Montebello
City
Montebello
City CS 4SSO10411 14 3,257 601 1,752 18 53 0.3 89.4 60.7 0 Operational
Performance
14 3,257 601 1,752 0.3 89.4 60.7 0.0
When assessing the performance of sanitary sewer systems regulated under the Statewide Sanitary Sewer Systems General Order, it is important to review spill reports in detail. There may be multiple individual spill event IDs that share the same location.
The search results on this summary page present summary data from individual spill reports submitted in the online CIWQS Sanitary Sewer System Database, meeting the search criteria selected. To determine if spill reports relate to a common failure point within the sanitary sewer system, the spill reports should be reviewed in detail by selecting a number under the “Total Number of Spills” column, corresponding to a specific sanitary sewer system.
The “Responsible Agency”, or Enrollee, listed on a spill report is responsible for the spill described and should be contacted directly for questions related to that incident.
The current report was generated with data entered by Enrollees on the previous day.
Back to Main Page | Back to Top of Page
© 2024 State of California.
4/25/25, 3:00 PM California Integrated Water Quality System (CIWQS 20.5) - Build Number: 04.04.2025.09.00.00 https://ciwqs.waterboards.ca.gov/ciwqs/readOnly/PublicReportSSOServlet?OWASP_CSRFTOKEN=8FU0-P0WJ-1ZZ0-JSA3-BSE6-C8WQ-I8SH-0G93 1/1
SEWER MAINTENANCE DIVISION
PRODUCTIVITY REPORT
CITYNAME
(Blank)
AGOURA HILLS
ARCADIA
ARTESIA
ASUZA
BALDWIN PARK
BELL GARDENS
BELLFLOWER
BRADBURY
CALABASAS
CARSON
COMMERCE
1,025
TOTAL HYDRO FT
1,025
HYDRO PERIODIC ft
0 HYDRO REQUESTED ft
0 HYDRO SERVICE REQUESTED ft
0 TOTAL RODDER CLEANING FT
0 CCTV'd FT
0 MH ADJUSTED
0 RODDER PERIODIC FT
0 RODDER REQUEST FT
0 RODDER SERVICE REQUEST FT
0 SADDLE INSTALLED
0 FALSE ALARM
0 ROOTS FT
0 OVERFLOW
0 CLEAR STOPPAGES
0 FLOODOUTS
0 MISC
Year
2020
2021
2022
2023
2024
2025
0.00 MH INSPECTED
0 MH RECONSTRCT
0 ROACH COMPLAINTS
3 OTHER SERVICE REQ
3 TOTAL SERVICE REQ RESPONDED
0 REFERRALS
0 MH DUSTED
0 SIPHON
6 MH Test For Gas
0 MH BAITED
0 LOST LATERAL
NON-CSMD
MONTEBELLO
SEWER MAINTENANCE DIVISION
PRODUCTIVITY REPORT
CITYNAME
(Blank)
AGOURA HILLS
ARCADIA
ARTESIA
BALDWIN PARK
BELL GARDENS
BELLFLOWER
CALABASAS
CARSON
COMMERCE
COMPTON
CUDAHY
1,700
TOTAL HYDRO FT
1,350
HYDRO PERIODIC ft
0 HYDRO REQUESTED ft
350
HYDRO SERVICE REQUESTED ft
1,000
TOTAL RODDER CLEANING FT
0 CCTV'd FT
0 MH ADJUSTED
0 RODDER PERIODIC FT
1,000
RODDER REQUEST FT
0 RODDER SERVICE REQUEST FT
0 SADDLE INSTALLED
0 FALSE ALARM
0 ROOTS FT
0 OVERFLOW
0 CLEAR STOPPAGES
0 FLOODOUTS
0 MISC
Year
2020
2021
2022
2023
2024
2025
0.00 MH INSPECTED
0 MH RECONSTRCT
0 ROACH COMPLAINTS
2 OTHER SERVICE REQ
2 TOTAL SERVICE REQ RESPONDED
0 REFERRALS
0 MH DUSTED
0 SIPHON
14 MH Test For Gas
0 MH BAITED
0 LOST LATERAL
NON-CSMD
MONTEBELLO
SEWER MAINTENANCE DIVISION
PRODUCTIVITY REPORT
CITYNAME
(Blank)
AGOURA HILLS
ARTESIA
ASUZA
BALDWIN PARK
BELL GARDENS
BELLFLOWER
BRADBURY
CALABASAS
CARSON
COMMERCE
COMPTON
3,843
TOTAL HYDRO FT
1,050
HYDRO PERIODIC ft
2,793
HYDRO REQUESTED ft
0 HYDRO SERVICE REQUESTED ft
0 TOTAL RODDER CLEANING FT
0 CCTV'd FT
0 MH ADJUSTED
0 RODDER PERIODIC FT
0 RODDER REQUEST FT
0 RODDER SERVICE REQUEST FT
0 SADDLE INSTALLED
0 FALSE ALARM
0 ROOTS FT
0 OVERFLOW
0 CLEAR STOPPAGES
0 FLOODOUTS
0 MISC
Year
2020
2021
2022
2023
2024
2025
0.00 MH INSPECTED
0 MH RECONSTRCT
0 ROACH COMPLAINTS
0 OTHER SERVICE REQ
0 TOTAL SERVICE REQ RESPONDED
0 REFERRALS
0 MH DUSTED
0 SIPHON
18 MH Test For Gas
0 MH BAITED
0 LOST LATERAL
NON-CSMD
MONTEBELLO
SEWER MAINTENANCE DIVISION
PRODUCTIVITY REPORT
CITYNAME
(Blank)
AGOURA HILLS
ARCADIA
ARTESIA
BALDWIN PARK
BELL GARDENS
BELLFLOWER
BRADBURY
CALABASAS
CARSON
COMMERCE
COMPTON
700
TOTAL HYDRO FT
700
HYDRO PERIODIC ft
0 HYDRO REQUESTED ft
0 HYDRO SERVICE REQUESTED ft
0 TOTAL RODDER CLEANING FT
354
CCTV'd FT
1 MH ADJUSTED
0 RODDER PERIODIC FT
0 RODDER REQUEST FT
0 RODDER SERVICE REQUEST FT
0 SADDLE INSTALLED
0 FALSE ALARM
0 ROOTS FT
0 OVERFLOW
0 CLEAR STOPPAGES
0 FLOODOUTS
0 MISC
Year
2020
2021
2022
2023
2024
2025
0.00 MH INSPECTED
0 MH RECONSTRCT
0 ROACH COMPLAINTS
1 OTHER SERVICE REQ
1 TOTAL SERVICE REQ RESPONDED
0 REFERRALS
0 MH DUSTED
0 SIPHON
6 MH Test For Gas
0 MH BAITED
0 LOST LATERAL
NON-CSMD
MONTEBELLO
SEWER MAINTENANCE DIVISION
PRODUCTIVITY REPORT
CITYNAME
(Blank)
AGOURA HILLS
ARCADIA
ARTESIA
BALDWIN PARK
BELL GARDENS
BELLFLOWER
BRADBURY
CALABASAS
CARSON
COMMERCE
COMPTON
1,050
TOTAL HYDRO FT
1,050
HYDRO PERIODIC ft
0 HYDRO REQUESTED ft
0 HYDRO SERVICE REQUESTED ft
0 TOTAL RODDER CLEANING FT
0 CCTV'd FT
0 MH ADJUSTED
0 RODDER PERIODIC FT
0 RODDER REQUEST FT
0 RODDER SERVICE REQUEST FT
0 SADDLE INSTALLED
0 FALSE ALARM
0 ROOTS FT
0 OVERFLOW
0 CLEAR STOPPAGES
0 FLOODOUTS
0 MISC
Year
2020
2021
2022
2023
2024
2025
0.00 MH INSPECTED
0 MH RECONSTRCT
1 ROACH COMPLAINTS
0 OTHER SERVICE REQ
1 TOTAL SERVICE REQ RESPONDED
0 REFERRALS
0 MH DUSTED
0 SIPHON
6 MH Test For Gas
0 MH BAITED
0 LOST LATERAL
NON-CSMD
MONTEBELLO
City of Montebello
Sewer System Management Plan (SSMP) May 2025
APPENDIX H
SEWER MAINTENANCE AGREEMENT
ITEM # 19
CITY OF MONTEBELLO
CITY COUNCIL AGENDA STAFF REPORT
TO: Honorable Mayor and City Council Members
FROM: Raul Alvarez, City Manager
BY: Cesar Roldan, Director of Public Works
SUBJECT: APPROVE AMENDMENT NO. 1 TO AGREEMENT NO. 3999 WITH
MARK THOMAS FOR ON-CALL ARCHITECTURAL AND
ENGINEERING DESIGN SERVICES
DATE: June 11, 2025
RECOMMENDATIONS:
It is recommended that the City Council:
1. Approve Amendment No. 1 to Agreement No. 3999 between the City of Montebello and Mark Thomas for a One (1) Year Extension; and
2. Authorize the City Manager to execute the Amendment on behalf of the City; and
3. Take such additional, related action that may be desirable.
FISCAL IMPACT:
Mark Thomas & Company, Inc. currently provides citywide on-call architectural and engineering design services to the City of Montebello on an as-needed basis. Staff is recommending the approval and execution of Amendment No. 1 to Agreement No. 3999 (Attachment A), which would extend the term of the agreement by one (1) additional year, through June 30, 2026. The contract’s total not-to-exceed amount will remain unchanged at Two Million Dollars ($2,000,000).
The agreement is administered by the Department of Public Works and is supported through a combination of funding sources, including Measure R, Measure M, Proposition A, Proposition C, and Gas Tax.
Mark Thomas is currently providing engineering support for several active Capital Improvement Projects (CIPs), including the Paving the Way Program – Montebello Boulevard from Los Angeles Avenue to Lincoln Avenue and the Montebello Downtown
CITY COUNCIL AGENDA REPORT - MEETING OF JUNE 11, 2025
Sewer Infrastructure Project. These complex, multi-phase projects require continuity in professional services to ensure successful completion. Extending the agreement will enable Mark Thomas to provide ongoing technical support and project management assistance necessary to close out these and other key infrastructure initiatives.
BACKGROUND/DISCUSSION:
On July 1, 2022, the City of Montebello entered into Agreement No. 3999 with Mark Thomas & Company, Inc. to provide professional on-call engineering services. This agreement was the result of a formal competitive selection process conducted through Request for Proposals (RFP) No. 22-8, which sought qualified consultants to support the City’s CIPs. The original agreement was structured as a three-year term, expiring on June 30, 2025, with the option to extend the contract for up to two additional one-year terms at the City’s discretion.
Since the agreement’s inception, Mark Thomas has consistently delivered high-quality engineering services to the City on an as-needed basis. Their scope of services includes, but is not limited to, civil and structural design, plan review, traffic engineering, cost estimating, and project management support. Notably, the firm has played a significant role in several key CIP projects, such as the Acuna Dog Park and various citywide infrastructure improvements. Given their ongoing involvement and familiarity with the City’s processes, procedures, and project history, the continuity of Mark Thomas’ services is critical to the timely and successful completion of these efforts.
In light of their performance and the continuing need for their services, staff recommend exercising the first one-year extension option as outlined in Section 1 of Agreement No. 3999 (Attachment B). Approval of Amendment No. 1 will formally extend the agreement's term through June 30, 2026, under the same terms and conditions. This extension will ensure that the City retains experienced and capable engineering support as it advances ongoing CIPs.
ENVIRONMENTAL:
N/A
ANALYSIS:
N/A
SUMMARY:
Staff recommends extension of the term of Professional Services Agreement No. 3999 through June 30, 2026; and authorize the City Manager to execute Amendment No. 1 (Attachment A).
ATTACHMENT(S)
1. Attachment A - Amendment No 1 to Agreement No. 3999
CITY COUNCIL AGENDA REPORT - MEETING OF JUNE 11, 2025
2. Attachment B - Agreement No. 3999 - Mark Thomas & Company
CITY OF MONTEBELLO
AMENDMENT NO. 1
TO PROFESSIONAL SERVICES AGREEMENT NO. 3999
WITH MARK THOMAS & COMPANY, INC.
This Amendment No. 1 to the Professional Services Agreement (“Amendment No. 1”), is made and entered into this 11th day of June 2025, (“Effective Date”) by and between the City of Montebello, a California municipal corporation, (hereinafter referred to as the “City”) and Mark Thomas & Company, Inc., (hereinafter referred to as the “Contractor”).
The City and the Contractor are sometimes hereinafter individually referred to as a "Party" and jointly as the "Parties".
RECITALS
WHEREAS, the Contractor and the City entered into that certain Agreement No. 3999 for On-Call Architectural and Engineering Design Services by and between the City of Montebello and Mark Thomas & Company, Inc., dated July 1, 2022 ("Agreement"), pursuant to which City retained Contractor to provide On-Call Architectural and Engineering Design Services, as further described in the Agreement; and WHEREAS, the City awarded the Agreement to the Contractor based on their qualification, subsequent to a competitive selection process.
WHEREAS, The Agreement at Section 1.TERM provides, this Agreement may be extended for up to two (2) additional, one-year (1) terms upon such terms and conditions mutually agreed upon by the Parties in writing; and
WHEREAS, for the reasons set forth herein, the City and Consultant desire to enter into this Amendment No. 1, as set forth below.
NOW THEREFORE, in consideration of the mutual promises and covenants contained herein, the receipt adequacy of which is expressly acknowledged by the Parties, the Parties agree to amend the Agreement as follows:
AMENDMENTS TO AGREEMENT NO. 3999
SECTION 1. “Term.” The Parties hereby acknowledge the exercise of Section 1.
Term of Professional Services Agreement No. 3999, Amendment No. 1 which allows for the extension of the Agreement for an additional one (1) year. The original termination/expiration date of the Agreement, as set on June 30, 2025, is hereby extended, and the Agreement will now terminate on June 30, 2026. This extension is in accordance with the provisions outlines in the Agreement, demonstrating the City’s commitment to the continued provisions of On-Call Architectural and Engineering Design Services by Mark Thomas & Company, Inc.
ATTACHMENT A
AMENDMENT NO. 1 TO AGREEMENT NO. 3999
SECTION 2. Except as expressly modified or supplemented by this Amendment No. 1, all other provisions of the Agreement, shall remain unaltered and in full force and effect. In the event of conflict between the provisions of this Amendment No. 1 and the provisions of the Agreement, the provisions of this Amendment No. 1 shall control. [END OF AMENDMENT NO. 1]
AMENDMENT NO. 1 TO AGREEMENT NO. 3999
IN WITNESS WHEREOF, the Parties execute this Amendment No. 1 to take effect as of the Effective Date identified above.
(“CITY”) (“CONTRACTOR”)
CITY OF MONTEBELLO MARK THOMAS & COMPANY, INC.
Raul Alvarez, City Manager Darin Johnson, P.E.,
Division Manager + Associate Principal
ATTEST:
Christopher Jimenez, City Clerk
APPROVED AS TO FORM:
Arnold M. Alvarez-Glasman, City Attorney
ATTACHMENT B
Exhibit A
Scope of Work
SUBMISSION DATE
PROJECT
PREPARED FOR
PROPOSAL
City of Montebello
JUNE 2, 2022
ON-CALL
ARCHITECTURAL
AND ENGINEERING
DESIGN SERVICES
RFP NO. 22-8
MARKTHOMAS.COM
(949) 477-9000
2121 ALTON PARKWAY, SUITE 210
IRVINE, CA 92606
June 2, 2022
James Enriquez, P.E., Director/City Engineer
City of Montebello Public Works Department
1600 W. Beverly Boulevard
Montebello, CA 90640
Dear Mr. Enriquez:
The City of Montebello (City) is seeking consultants to provide On-Call Architectural and Engineering Design Services for a variety of Capital Improvement Projects (CIP) citywide. The Mark Thomas team is ideally suited to deliver the upcoming tasks under the on-call, Mark Thomas is a recognized industry leader in the planning, design, and management of transportation mobility projects. We have delivered hundreds of general civil engineering projects ranging from the planning phase and conceptual design phase through the final design and construction phases.
We have in-house personnel and a team of specialty subconsultants with the necessary expertise in a wide array of disciplines to support your anticipated infrastructure improvements. In addition, we have grant funding experts who are knowledgeable about federal and non-federal funding sources as well as the administration of these grant funds.
Mark Thomas has extensive experience providing a wide range of civil and structural engineering, landscape architecture, and surveying services for infrastructure projects throughout California. Our firm focuses on client satisfaction by providing proactive service and the delivery of task orders on schedule and within budget. We offer the City key benefits including:
Project Manager with the Right Experience. Our team will be led by Pat Somerville, PE, as project manager. Pat is a former public sector employee who has over 36 years of experience managing and delivering CIP projects for public works agencies throughout southern California. His vast experience encompasses projects similar to your CIP, including street improvements, sewer, storm drain, streetscape, active transportation, transit and even buildings and facilities. Pat brings in-depth knowledge of local agency policy and procedures, guidelines and standards, and will work with the City to produce efficient and cost-effective solutions on each task order assigned to Mark Thomas under this on-call.
Strong and Dedicated Project Team. Pat will be supported by a full team of technical staff and subject matter experts who were selected because of their abilities to manage the variety of anticipated projects. We provide key personnel that have worked in the public sector, so they know and understand what’s required to be successful. In addition to our in-house staff we have a strong group of subconsultants supporting our team, including:
Firm Role
LIN Consulting, Inc. (DBE) Traffic Engineering
W.G. Zimmerman Engineering, Inc. (SBE) Traffic Studies, Grant Funding Administration CL Surveying and Mapping, Inc. (DBE) Surveying and Mapping GPA Consulting (DBE) Environmental, Regulatory Permitting Earth Mechanics, Inc. (DBE) Geotechnical
Arellano & Associates (DBE) Public Outreach
AKM Consulting Engineers (SBE) Pump and Lift Stations
Tatsumi & Partners (DBE) Landscape Architecture
BOA Architects (DBE) Facility Improvements
Monument ROW (DBE) Right of Way
MARKTHOMAS.COM
(949) 477-9000
2121 ALTON PARKWAY, SUITE 210
IRVINE, CA 92606
Eight of these firms are DBE certified, allowing us to easily meet your existing and future DBE goals. These well-qualified firms have been selected based on the strong working relationships we hold, and their extensive experience working within the Los Angeles region.
Depth of Resources. We have structured our team specifically to provide you the depth of resources needed to successfully deliver your CIP. We have provided an overlap in many disciplines, not only to ensure DBE compliance, but to provide additional resources that will enable us to deliver multiple, concurrent task orders. This approach has been proven on other on-call contracts and will help ensure that the City can meet its commitments in delivering the CIP.
Successful On-Call Task Order Management. Mark Thomas staff is highly familiar with the management of on-call contracts and the execution of various, and often concurrent, task orders. We have recently or are currently managing on-call contracts for over a dozen agencies throughout Southern California. Our approach to providing successful on-call services is characterized by carefully listening to our clients’ needs and goals, proactive communication, and being highly responsive.
Under Pat’s leadership, the City can be assured that each task order will be executed on time, within budget, and with exceptional quality.
With our successful history delivering on-call projects, and the experience of our team and subconsultants, we are uniquely qualified to develop and deliver the City’s projects over the life of this contract. The project will be managed from our office located at 2121 Alton Parkway, Suite 210, Irvine, CA 92606. Pat Somerville will oversee the services and be the City’s primary contact. He can be reached at (714) 815-5222 or [email protected].
As an associate principal of Mark Thomas, I am authorized to negotiate and contractually bind the firm. We have included our contract comments for the City’s consideration. We do not have any existing or potential conflict of interest that could arise from this engagement. We acknowledge receipt of Addenda No. 1. By submitting our proposal, we commit to providing the City with a highly experienced team, dedicated to the successful management and delivery of this on-call. We are excited to partner with the City and look forward to the successful delivery of the task orders.
Sincerely,
MARK THOMAS & COMPANY, INC.
Darin Johnson, PE
Division Manager + Associate Principal
CITY OF MONTEBELLO ON-CALL ARCHITECTURAL AND ENGINEERING
DESIGN SERVICES
MARK THOMAS
>6K
projects delivered
11 offices statewide
300+
team members
95 years in business
FIRM QUALIFICATIONS & EXPERIENCE
ABOUT MARK THOMAS
Our team is ideally suited to deliver the upcoming tasks under the On-Call for Architectural and Engineering Design Services for the City of Montebello (City). Mark Thomas is a recognized industry leader in the planning, design, and management of infrastructure projects. We have delivered hundreds of general civil engineering projects ranging from the planning phase through the final design and construction support. We have in-house experts in a variety of disciplines to support engineering projects, including local street improvements, preliminary planning and cost estimating for future capital improvement projects, feasibility studies, right of way engineering, pre-construction outreach services, program management, design of bicycle and pedestrian-friendly multi-modal facilities, traffic planning and engineering, signing and striping, ADA improvements, drainage improvements, pavement rehabilitation, surveying, and landscape architecture. In addition, we have in-house grant funding experts who are knowledgeable about federal and non-federal funding sources and can both evaluate and prepare grant applications to help fund projects, should the need arise.
Mark Thomas has been a reliable partner to Southern California agencies and currently works closely with numerous cities and counties within the Los Angeles and Orange County region providing on-call services; including the cities of Anaheim, La Mirada, Irvine, Fullerton, Santa Ana, and Irvine; the counties of Orange, Riverside and San Bernardino; and program management services to the City of Corona, City of Inglewood, and Los Angeles World Airports.
KEY BENEFITS OF THE MARK THOMAS TEAM
In-House Planning and Design Expertise
Mark Thomas has the unique in-house combination of transportation planning and design services. Our transportation planning and design disciplines are supported by numerous other disciplines in-house, so while subconsultant partners are a value-add to our team structure, we have the unique capability of performing most tasks without the need to outsource.
This experience allows us to develop mobility solutions that are feasible, implementable, and have realistic budgets.
On-Call Experience
Our team of accomplished staff have delivered numerous task orders with a wide range of scopes of work with varied schedules. Whether working on behalf of municipal clients or public agencies, Pat is experienced at advancing multiple efforts concurrently.
Tailored Approach
We tailor our approach to the needs of each task order, attending to the particular challenges, constraints, budget and schedule. We understand how to accommodate the unique needs of each site, and our approach allows us to develop context sensitive designs that address community needs and avoid a “one size fits all” approach.
Public Agency Experience
Pat and our support team are well-practiced at serving local agencies throughout California. We have multiple former public employees on staff and they bring thorough understanding of public policies and procedures. We have bid thousands of projects throughout the State and are fully aware of these governing procedures, requirements and laws. Not only in support of our design documents, but also in a construction management role. We are also intimately familiar with reviewing and addressing contractor claims during construction. We are accustomed to working in various capacities for public agencies and operate as a true extension of their staff. corporation
CA
CITY OF MONTEBELLO ON-CALL ARCHITECTURAL AND ENGINEERING
DESIGN SERVICES
MARK THOMAS
AREAS OF EXPERTISE
Mark Thomas’ areas of expertise are well-matched to meet the City’s needs. We possess strong in-house resources and we have the technical capabilities to provide specialized services to efficiently deliver various types of projects that may arise from this on-call contract. Below are examples of our areas of expertise.
Roadway Improvements
Mark Thomas is recognized as an industry leader in the planning, design, and delivery of roadway and highway improvement projects. Our experience spans from localized widening projects, gap closures, realignments and intersection improvements, to grade separations and arterial reconstructions, as well as Caltrans highway widening and interchanges. We have the expertise to deliver both small localized projects as well as complex highway improvements. We are knowledgeable of local agency design standards, the Standard Plans and Specifications for Public Works Construction (Greenbook), the Caltrans Highway Design Manual (HDM), and the AASHTO. We offer a solid group of experienced professionals in all phases of project delivery, including planning documents, preliminary engineering, and final plans, specifications, and estimates (PS&E).
Traffic Engineering and Transportation Planning
Our team includes recognized experts who have delivered traffic engineering and transportation planning projects for clients throughout Southern California. Our services include working with staff and stakeholders to address residential traffic management concerns, interacting directly with homeowners and their representative associations, commissioners, elected officials and business owners. Our team has extensive experience with transportation planning studies related to system improvements and land development projects. We have worked with many cities to refine their traffic system signal operations and implement traffic calming designs into local roadway reconfigurations and widenings.
Complete Streets/Active Transportation/Trails
Mark Thomas has extensive experience planning and designing complete streets, active transportation corridors and paths and trails for bicycles and pedestrians to connect to key destinations including schools, housing, employment, commercial centers, and other recreational facilities. We have developed the knowledge and expertise essential to designing improvements that facilitate access, connectivity, and safety for all modes of travel. Our Complete Streets projects ultimately facilitate the growth of local businesses and developments while accommodating design elements that appeal to both vehicles and pedestrians. Our designs incorporate NACTO and other Complete Streets guidelines, as well as nationwide best practices and innovations.
ADA Compliance and Design
Mark Thomas excels at integrating ADA compliant practices into all types of roadway, parks, parking lots, and other facilities. We have assisted many local municipalities and even Caltrans in analyzing and achieving ADA compliance. This includes all aspects of design including curb ramps, slopes, and path of travel. Providing detailed elevations and slopes for all grade breaks and critical points is key to eliminating any misinterpretations of the standard plan by the contractor during construction and allowing enough room to accommodate traditional construction tolerances. If selected, we would be preparing curb ramp construction details as necessary, building from the City’s Standards.
Our experience will be invaluable in assessing and prioritizing ADA requirements in any task order, familiarity with ADA standards is critical for any project.
Drainage/Stormwater
We are experienced in the analysis and design of stormwater and drainage facilities. Our task leads have successfully completed numerous projects involving the preparation of hydraulic and hydrology analysis and reports for creeks and pipelines, bridge scour analysis, erosion control plans, and Water Quality Management Plan (WQMP) implementation plans, including most recently drainage/ Low Impact Development (LID) improvements for the Limonite Gap closure in Eastvale. We are capable of designing a wide variety of drainage facilities that include storm drain inlets, storm drain lines, drainage ditches, flood channel grading and modifications, flood control structures, and complex sand filter systems.
CITY OF MONTEBELLO ON-CALL ARCHITECTURAL AND ENGINEERING
DESIGN SERVICES
MARK THOMAS
Bridge/Structure Design
Mark Thomas has extensive experience delivering transportation, flood control, and bridge structure projects. This includes the design of new bridges, bridge replacements and rehabilitations, retaining walls, soundwalls, flood walls, water/wastewater structures, and other structures. Our retaining wall design experience encompasses standard cantilever retaining walls through more complex systems like MSE walls and tieback walls. We are knowledgeable of the Caltrans Bridge Design Manual and Standards, as well as AASHTO Load and Resistance Factor Design Standards.
Survey/Right of Way
Mark Thomas provides a full range of surveying services; including right of way retracement surveys, legal descriptions, plats and deeds, and we provide support with lot line adjustments or boundary line adjustments. We also have extensive experience providing surveying services to suit all phases of projects from project planning topographic base information for construction documents, up to and including layout and support for construction activities.
Landscape Architecture
Mark Thomas offers landscape architecture and urban design services with an integrated and comprehensive planning and design suite of services. Focusing on site-responsive design with the goal of providing specific community improvements, yields a successful project. We have the flexibility to deliver a range of projects such as a detailed complete street planning, streetscape and green street designs, median and gateway enhancements, landscape master plans, and trail designs.
The focus on public infrastructure projects allows our team to understand the regulatory environment and local preferences for landscape and aesthetic design, and to implement these improvements while meeting limited capital budget.
Transit Facilities
Mark Thomas brings the City experience in developing the interface between transit systems, including bus, bus rapid transit (BRT), light rail (LRT) and streetcar, and your city streets. This experience includes the user experience of boarding or crossing the facility, development of stops and stations and corridor-wide transit improvements that enhance the community. We have also provided operation and headquarter facility planning and design to support the systems. Our capabilities also include the review of third-party designs and documentation for implementation of transit systems.
Grant Funding Assistance
Our staff have provided application assistance for multiple state and federally-funded projects. Our staff has worked with local agencies to submit grant applications for multiple programs and are experienced preparing Requests for Authorization (RFA) to Caltrans Local Assistance for various phases of work; including Preliminary Engineering (PE), Right of Way (R/W), Utility relocation (RW/ UTIL), and Construction (CON). In the last 4 years, Mark Thomas has secured more than $340M in grant funding for clients throughout California.
Multimodal Improvements on Bayside Drive, Newport Beach
CITY OF MONTEBELLO ON-CALL ARCHITECTURAL AND ENGINEERING
DESIGN SERVICES
MARK THOMAS
STATE & FEDERAL FUNDING SUPPORT
Mark Thomas has extensive experience managing and designing state and federally funded projects for local agencies. We fully understand the administrative challenges that come along with this funding. We have an unmatched understanding of the Caltrans Local Assistance process gained through delivering more than 100 projects that involved Caltrans Local Assistance coordination. We are intimately familiar with the Caltrans Local Assistance Procedures Manual (LAPM) and Local Assistance Program Guidelines (LAPG) requirements and processes. The LAPM and LAPG are guidelines and instructions for the state and federal programs. These guidelines require compliance with federal and/or state laws, regulations, policies and procedures related to design, right of way acquisition and utility relocation, construction and maintenance.
We also have extensive experience with State-only funding requirements as well. We have recently prepared Senate Bill 1 (SB-1) forms and reports for the City of Corona McKinley Street Grade Separation Project that is funded with Trade Corridor Enhancement Program (TCEP) and Proposition 1B Highway- Railway Crossing Safety Account (HRCSA) funds.
Our recent experience also includes projects funded through the Active Transportation Program (ATP) and Highway Safety Improvement Program (HSIP).
POSITIONING THE CITY FOR FUNDING
We have an in-depth understanding of funding programs and state and federal policies and proven success securing competitive grant funds. We also have extensive planning design experience for complex transportation projects. We have delivered numerous projects requiring grant writing, grant administration, and related services including technical writing and development of narratives, cost benefit analysis, air quality benefit calculations, economic impact analysis, exhibits to support grant applications, cost estimates, requests for authorization, funding, reimbursements, and grant reporting.
We have assisted agencies with the preparation of Active Transportation Program (ATP); Highway Safety Improvement Program (HSIP); Senate Bill (SB 1) programs including Trade Corridor Enhancement Program (TCEP), Local Partnership Program (LPP), and Solutions for Congested Corridors Plan (SCCP); Bicycle Corridor Improvement Program (BCIP); Highway Bridge Program (HBP); California Natural Resources Agency (CNRA) programs; Rebuilding American Infrastructure with Sustainability and Equity (RAISE) Discretionary Grants, and federal discretionary program applications.
Our team is well practiced at analyzing funding opportunities and project financing needs, developing grant narratives and benefit cost analyses, developing exhibits and maps, and coordinating with stakeholders to obtain letters of support. In 2020, we prepared 10 competitive SB-1 applications, 11 ATP applications, and nine HSIP applications. In the past four years, we have secured more than $340 million in transportation funding.
Where Mark Thomas
separates itself from other
firms is we provide both
the in-house technical
writing and engineering
capabilities. Many firms
that only offer grant
funding support services
have to rely on agencies
or other consultants to
prepare the technical
content. Our combination
of grant funding expertise
and project delivery
experience will reduce the
amount of work required
by the City when seeking
funding.
For the County of Orange OC Loop, Segments O, P, Q, Mark Thomas prepared the conceptual plans, helped secure ATP Grant Funding and are now providing the final design services on this $45M project.
CITY OF MONTEBELLO ON-CALL ARCHITECTURAL AND ENGINEERING
DESIGN SERVICES
MARK THOMAS
SUBCONSULTANTS
In order to provide comprehensive services, we have selected trusted subconsultants to help us deliver task orders for the City. We selected our team based on our ongoing working relationship and previous track record of success with them on similar types of projects. We have provided a suite of DBE certified subconsultants to ensure your DBE goals are met on both State and Federally funded projects. This also provides a depth of resources that allows our team to deliver concurrent task orders for the City. All of our subconsultants have excellent reputations and are extremely competent, qualified in their areas of expertise and have a proven history of delivering for their clients.
AKM Consulting Engineers SBE
Pump & Lift Stations
AKM Consulting Engineers is a multi-disciplined professional organization that specializes in providing water resources engineering and related services to public agencies. Scope of services offered includes all facets of planning, design, construction management and inspection of wastewater,
drainage, recycled and water facilities.
Arellano Associates DBE
Public Outreach
Arellano Associates has a history of managing and directing public outreach programs for many highway, planning,
and transportation projects. They provided public outreach and stakeholder engagement for numerous engineering
contracts and they understand the coordination
efforts required to ensure a well-executed and tailored engagement effort.
BOA Architecture DBE
Building Improvements
BOA has performed over 2,000 architectural design services for over 80 local public entities with many comparable
to those anticipated in the on-call contract. They have experience with Civic Center Facilities, Fire Stations, Police Departments, Community Centers, Libraries, ADA
compliance, Parks & Recreation, and workplace safety/
security enhancements.
CL Survey DBE
Surveying & Mapping
CL Survey provides professional land surveying services throughout Southern California. They have extensive
experience with on-call work and are currently working
with The Long Beach Annual Major and Residential OnCall. They also have many years’ experience working with Caltrans on various on-call contracts with in District 7, and have performed aerial survey and topographic survey work throughout Los Angeles County.
Earth Mechanics, Inc. DBE
Geotechnical Engineering
Earth Mechanics is a geotechnical and earthquake
engineering consulting company specializing in
transportation projects. They have provided site
investigation, geotechnical analysis, foundation design and construction support for various public works
projects including bridges, roadways, and bikeways in
Southern California. Projects include multiple City of Los Angeles Bridge/Civil On-Call Contracts, the Rosecrans/
Marquardt Grade Separation in Santa Fe Springs; and the WB SR-91 from Shoemaker Avenue to Alondra Boulevard
Improvements in Los Angeles County.
GPA Consulting DBE
Environmental
GPA is a multi-disciplinary consulting firm specializing in environmental planning, biological resource studies, and historic preservation planning. GPA is particularly skilled in transportation and infrastructure projects, including roadway/highway, bridges, emergency repairs, and
bicycle and pedestrian facilities. Many of these projects are processed through the California Department of
Transportation (Caltrans) Local Assistance Program, thereby giving staff an in-depth knowledge of Caltrans’ Local
Assistance Procedures Manual and Standard Environmental Reference.
LIN Consulting DBE
Traffic Engineering
LIN Consulting has been teaming with Mark Thomas
since 2012 and specializes in traffic, civil, and electrical engineering, for over 25 years they have been serving local communities across Southern California. They have been
involved with several design on-call contracts within Los Angeles County and have performed various task orders
under those contracts. LCI is familiar with the On-call process and have provided high-quality work consistently even with tight schedules.
Monument ROW DBE
Right of Way
Monument is a full-service real estate and right-of-way company providing exceptional service, strategic planning, innovation and timely delivery. They serve local, state and federal agencies, transportation authorities and engineering partners with public infrastructure projects throughout California. They have extensive experience working
throughout Southern California and have teamed with
Mark Thomas on numerous occasions. Their most recent
experience includes leading acquisition efforts for the SR47/Front Street Interchange for the Port of Los Angeles with Mark Thomas.
CITY OF MONTEBELLO ON-CALL ARCHITECTURAL AND ENGINEERING
DESIGN SERVICES
MARK THOMAS
Tatsumi & Partners, Inc. DBE
Landscape Architecture
Tatsumi & Partners has been servicing the Southern
California public works-related market for over 37 years, while earning a reputation for being one of the premiere public works landscape architectural firms in Southern
California. Their expertise includes aesthetics, design, irrigation design, irrigation system analysis, public outreach, liability risk management, water management. Tatsumi &
Partners recently worked with the City of Montebello on the Grant Rea Park Project.
W.G Zimmerman Engineering, Inc. SBE
Traffic Studies | Grant Funding Administration
WGZE is a certified Small Business Enterprise specializing in full-service civil, traffic, and transportation engineering, with extensive experience serving on-call contracts for various agencies throughout Southern California. They also provide staff augmentation for local cities, including vital roles such as City Traffic Engineer and/or City Engineer.
WGZE is a leader in grant funding administration, preparing and coordinating the necessary documentation to facilitate approvals and obligation of funding.
REFERENCES
We are proud of our track record of successfully completing projects and meeting the needs of our clients. Below is a list of our client references for projects similar to the City’s. We are confident that you will find that the highlighted projects demonstrate our ability to deliver the services you are seeking.
Bryan Jones
Former City Manager, City
of Eastvale
(510) 789-5823
[email protected]
Limonite Avenue Gap Closure, Eastvale
Mark Thomas provided the preliminary engineering, environmental clearance and PS&E development for this four-lane arterial highway providing a one-mile gap closure in the arterial network in Eastvale. The project includes a bridge over the Cucamonga Channel, Class IV bike lanes along with a Class I path that has a separate crossing of the channel within an SCE owned corridor.
Initial value engineering saved the City nearly $5M in overall costs. Extensive coordination was required with the adjacent industrial parcels, both existing and ones in entitlement, to ensure that the project conforms without impacting access. Regulatory permitting was also required. Mark Thomas also secured over $9M in LPP funds for the project
Jamie Lai
City of Yorba Linda
(714) 961-7172
[email protected]
Savi Ranch Parkway Widening, Yorba Linda
Pat Somerville, with a prior firm, was the Project Manager for the preliminary engineering phase of this project, providing 30% plans and estimate. The project widens Savi Ranch Parkway providing a through lane which leads to a third left turn lane.
The intersection at the Mirage Street was reconfigured by eliminating free right and yield right movements, improving operations and pedestrian safety. A retaining wall is required adjacent to the Pet Smart and Staple shopping center as well as the reconstruction of the driveway. Staging concepts were developed to minimize impact to the shopping center. Mark Thomas prepared the OCTA 2022 CTFP funding application for the project on behalf of the City and were successful in securing final design funding for the project.
Carlo Cambare
City of Irvine
(949) 724-7306
[email protected]
Walnut Avenue/The Mall Traffic Signal Improvements, Irvine Mark Thomas is providing design for the installation of a new traffic signal at Walnut Avenue/The Mall intersection in the City of Irvine. This heavily traveled roadway provides the community with connections to two residential neighborhoods, local neighborhood parks, and an elementary school. Project specific improvements include new traffic signals, potholing, ADA curb ramps, as well as signing and striping for this intersection.
CITY OF MONTEBELLO ON-CALL ARCHITECTURAL AND ENGINEERING
DESIGN SERVICES
MARK THOMAS
Key Staff
QA/QC
Josh Cosper, PE, QSD, PLS
PROJECT DIRECTOR
Darin Johnson, PE
CITY OF MONTEBELLO
James Enriquez, PE
PROJECT MANAGER
Pat Somerville, PE
ENGINEERING DESIGN/STUDIES
ROADWAY
Alan Su, PE
Xavier Espinosa, PE
Kimberly Barling
Ashley Lee
CALTRANS DESIGN/
COORDINATION
Ravi Shah, PE
Bo Burick, PE
TRAFFIC ENGINEERING
Ricky Chan, PE, TE, PTOE
Ray Kommidi, PE, TE -LIN
CONSULTING
TRANSIT SYSTEMS
Bobby Lin, PE
Jesseca Martinez
CONSTRUCTION
SUPPORT &
MANAGEMENT
Mazen Mneimneh, PE, QSD
ACTIVE TRANSPORTATION
Paul Martin, PE, TE, LCI
DRAINAGE/STORM
WATER
Flora Diaz, PE
PUMP/LIFT STATIONS
Zeki Kayiran, PE -AKM
CONSULTING ENGINEERS
UTLITY DESIGN/
COORDINATION
Robert Vasquez, PE
STRUCTURES
Julie Passalacqua, PE
PLAN CHECKING
Josh Cosper, PE, QSD, PLS
Trisha Keith, PE
SUPPORT SERVICES
ENVIRONMENTAL
Cesar Moreno -GPA
SURVEYING & MAPPING
Steve Heise, PLS
Lam Lee, PLS -CL SURVEYING
TRAFFIC STUDIES
Bill Zimmerman, PE, TE,
PTOE -WGZE
FACILITY IMPROVEMENTS
Edward Lok, Arch, LEED
AP -BOA
LANDSCAPE
ARCHITECTURE
Marty Armstrong, PLA
David Tatsumi, RLA, ASLA
-TATSUMI & PARTNERS
COMMUNITY OUTREACH
Maria Yanez-Forgash
-ARELLANO
GRANT ADMINISTRATION
Bill Zimmerman, PE, TE,
PTOE -WGZE
FUNDING SUPPORT
Ryan Bissegger
GEOTECHNICAL
Alahesh Thurairajah, PE, GE
-EARTH MECHANICS
RIGHT OF WAY
ENGINEERING
Byron Cazar, PLS
RIGHT OF WAY
ACQUISITION
Daniela Borbe -MONUMENT
REGULATORY
PERMITTING
Jennifer Johnson -GPA
Mark Thomas understands the importance of assembling a team who will be available throughout the duration of this contract. The organization chart depicts the lines of communication and responsibilities for our team. Our team consists of experienced personnel with past successful participation providing on-call services and project delivery. The organizational chart also reflects our ability to address any project need along with the depth of resources to handle concurrent task orders. Mark Thomas is aware of the City’s potential need for additional miscellaneous engineering services, and we are fully staffed to accommodate those needs as they arise.
As the project manager, Pat Somerville will be the City’s primary contact. Abbreviated resumes along with a listing of our staff qualifications are included in the following pages and full resumes for key staff are included at the end of this section.
ORGANIZATIONAL CHART
CITY OF MONTEBELLO ON-CALL ARCHITECTURAL AND ENGINEERING
DESIGN SERVICES
MARK THOMAS
PROJECT TEAM EXPERIENCE
Pat Somerville, PE | PROJECT MANAGER | AVAILABILITY 65% BS in Civil Engineering, California State University, Long Beach | CA PE C56141 » Former public agency employee with over 36 years of experience in transportation and public works improvement projects
» Strong project, contract, and program management history on a wide variety of assignments and projects
MEET OUR PROJECT MANAGER
Pat brings more than 36 years of experience in civil engineering and management with a focus on municipal and capital improvement projects. He started his career in the public sector, working nearly 12 years for the City of Fullerton.
This provides Pat with understanding of the inner workings of a City. Additionally, he has held numerous on-call contracts and program management assignments. A summary of this experience includes:
City of Fullerton: As an Associate Engineer for the
City, Pat was responsible for the delivery of the Capital Improvement Program (CIP), including the yearly arterial, residential and alley pavement programs, curb & gutter
and sidewalk replacement, street and intersection
widenings, sewer and storm drain improvements as well
as city facility upgrades including parks, the City Hall remodel and Library remodel projects.
Long Beach On-Call Services: Across five separate
contracts that Pat managed, over 30 task orders were
delivered that included a variety of services including residential and arterial street reconstruction projects, over 9 miles of streetscape improvements including new raised medians, hydrology and hydraulic reports that supported major storm drain upgrades and stormwater facilities.
Santa Ana On-Call Services: Through consecutive
on-call contracts, Pat delivered over 20 task orders that included residential and arterial pavement rehabilitation, structural analysis of existing city parking structures, upgrades of various city facilities. Pat also provided
program management services, working part time out of
City Hall, managing their CIP projects.
Tustin Consultant CIP Manager Services: Working
as an extension of city staff in City Hall, provided
management services oversee and facilitate the CIP
projects, including the annual major maintenance
projects, coordinated issues in all phases of the
project and prepared documents for the E-76 funding
packages to submit to Caltrans to receive the necessary authorizations.
Through this experience, he has developed proven consensus building skills with staff, the community and project stakeholders. He is adept at public presentations at City Council, Commission or community outreach meetings. He actively engages third parties, including transportation agencies, regulatory agencies, and utility companies, coordinating early and often through the project life cycle. He brings extensive experience with a proven ability of on-time project delivery.
Additional recent projects include:
» Systemic Safety Analysis Report, Montebello
» Long Beach Boulevard Complete Street Improvements,
South Gate
» Firestone Boulevard Widening, Norwalk
» Valley Boulevard Multimodal Improvements, Los Angeles » Complete Streets Program, Los Angeles
» Yorba Linda Boulevard Widening, Yorba Linda
» Doran Street Grade Separation, Los Angeles
» Westside Storm Drain Improvements, Long Beach
» Brea Canyon Road Widening, Orange County
» OC Loop Segment D Bike Path, Orange County
» OC Streetcar, OCTA
» Standard Avenue Bike Lanes, Santa Ana
CITY OF MONTEBELLO ON-CALL ARCHITECTURAL AND ENGINEERING
DESIGN SERVICES
MARK THOMAS
MEET OUR KEY STAFF
Supporting Pat are the following key staff. Pat hand selected this team of experts based on their skills and qualifications and how they will benefit the on-call contract. Most of our key team members have been working within the region for years and they have a thorough understanding of the standards, guidelines, and processes of the agencies.
Josh Cosper, PE, QSD, PLS | QA/QC, PLAN CHECKING |
AVAILABILITY 60%
BS in Civil Engineering, University of California, Irvine | CA PE C71667, CA PLS 8774, CA QSD 00709
» Over 18 years of experience on transportation and public works projects, including program management, for agencies throughout Southern California. » Project delivery specialist with strong background in street improvements, utility coordination and right of way.
Josh has more than 18 years of experience as a successful project manager, civil design lead, and right of way/utility lead on numerous complete streets, transportation and bridge projects. Josh brings a uniquely diverse set of skills to his projects as the QA/QC and plan checking lead. Having experienced all phases of a project - from feasibility study through to construction support - and through having more than just a background in design, Josh is able to view projects holistically, with a focus on value engineering and constructibility to ensure high quality construction documents that minimize potential for change orders. Recent projects include:
» Limonite Avenue Gap Closure, Eastvale
» Brea Canyon Road Widening, Orange County
» McKinley Grade Separation Program Management,
Corona
» SR-47/Front Street/Harbor Boulevard Interchange
Improvements, Los Angeles
» Right of Way Engineering Program Manager, Landside
Access Modernization Program Los Angeles World
Airport
Alan Su, PE | ROADWAY | AVAILABILITY 60%
BS in Civil Engineering, University of California, Irvine | CA PE C66042 » Over 20 years of experience delivering local roadway improvements, pedestrian and bicycle access improvements.
» Knowledgeable about all phases of project delivery for local infrastructure projects, including project reports, environmental documents, and final PS&E Alan Su has more than 20 years of diverse engineering experience in the transportation field. He has multi-use trails and local road improvement experience throughout Southern California, and as well as significant planning and engineering experience with Caltrans on the state highway system. He is known for his client service approach to successful project delivery with both public and private clients. His experience includes preliminary engineering to final design. » On-Call Professional Engineering Services, Yorba Linda » Bake Parkway/Jeronimo Road, Irvine
» Jeffrey Road/Irvine Boulevard Improvements, Irvine
» Irvine Center Drive/Bake Parkway, Irvine
» Technology Drive Extension, Irvine
» SR-47/Front Street/Harbor Boulevard Interchange
Improvements, Los Angeles
» SR-241/SR-91 Improvements Project Report, TCA
CITY OF MONTEBELLO ON-CALL ARCHITECTURAL AND ENGINEERING
DESIGN SERVICES
MARK THOMAS
Xavier Espinosa, PE | ROADWAY | AVAILABILITY 65%
BS in Civil Engineering, California State University, Los Angeles | CA PE C88927 » Over 9 years of experience delivering capital improvement projects in Los Angeles County, including numerous complete streets and grade separation projects. » Strong technical skills in developing cost-effective solutions, managing third-party coordination, and on-time delivery of projects.
Xavier brings more than 9 years of experience in small and large transportation projects in Southern California. He has experience in the design and coordination of local and arterial facilities, highways, at-grade rail crossings, and roadway improvements. He has led project teams in the delivery of projects to the client’s satisfaction, as well as supported the design in other disciplines such as rail, utilities, and storm drain design. His project experience includes roadway realignments, highway widening, grade separations, street rehabilitation, parkway improvements, and redesign of at-grade rail crossings. Recent projects include:
» Firestone Boulevard Widening, Norwalk
» Long Beach Boulevard Green Street Improvements,
South Gate
» 6th Street Viaduct Replacement, Los Angeles
» Doran Street Interim Improvements, Los Angeles
» Rosecrans/Marquardt Grade Separation, Santa Fe
Springs
» Turnbull Canyon Road Grade Separation, Los Angeles
» Complete Streets Program, Los Angeles
Paul Martin, PE, TE, LCI | ACTIVE TRANSPORTATION |
AVAILABILITY 60%
BS in Civil Engineering, University of California, Irvine | CA PE C65868, CA TE TR2315, CA LCI 4936
» Former public agency employee with over 23 years of experience improving public travel safety
» Brings extensive active transportation, community engagement, traffic engineering, and strategic funding experience
Paul has more than 23 years of experience as a transportation manager and traffic engineer. He has a strong engineering and planning background that is focused on improving public travel and safety. As a former public employee for OCTA and the City of Placentia, he has thorough understanding of public policies and procedures. Paul’s expertise includes active transportation, community engagement, traffic engineering, and strategic funding programs. As the first countywide Active Transportation Coordinator for Orange County Transportation Authority (OCTA), Paul secured over $6 million in ten distinct grants to address infrastructure and non-infrastructure needs. He is also familiar with the requirements of the Caltrans Sustainable Communities grant program and has managed multiple projects funded through the program. Recent projects include:
» Systemic Safety Analysis Report, Montebello
» On-Call Transportation and Traffic Engineering, Newport Beach
» Southern California Association of Governments On-Call » Mendez Historic Freedom Trail, Westminster
» Standard Avenue Protected Bike Lanes, Santa Ana
» County-Wide Active Transportation Plan, Orange County » OC Loop Promotion Strategy, Orange County
CITY OF MONTEBELLO ON-CALL ARCHITECTURAL AND ENGINEERING
DESIGN SERVICES
MARK THOMAS
Cesar Moreno | ENVIRONMENTAL | AVAILABILITY 55%
BA in Environmental Analysis and Design, University of California, Irvine | CA PE C56141 » Brings more than 14 years of experience managing, preparing, reviewing, and overseeing the approval of California Environmental Quality Act (CEQA) and National Environmental Policy Act (NEPA) documents
» Has experience working with public agencies including Los Angeles and Ventura Counties, and Caltrans.
Cesar is a Senior Environmental Planner and Project Manager with more than 14 years of experience involving the management, preparation, review, and approval of California Environmental Quality Act (CEQA) and National Environmental Policy Act (NEPA) documents. As a dedicated public servant, he assumed diverse roles in the fields of environmental, transportation, open space, natural resource, and city planning while working on major projects in some of the most environmentally sensitive areas of Los Angeles and Ventura counties. Mr. Moreno brings a versatile and innovative approach to project delivery, tailored to the needs of his clients and counterparts in the engineering, design, planning, environmental and legal professions. His approach is informed by multiple appointments to project teams at critical junctures during project development and construction. Recent projects include:
» Glendale Boulevard-Hyperion Avenue Complex of
Bridges Improvement, Los Angeles
» Northwest State Route 138 Corridor Improvements, Los
Angeles, County
» 6th Street Viaduct Replacement, Los Angeles
» Alameda Street Mobility, Los Angeles
Bill Zimmerman, PE, TE, PTOE | GRANT ADMINISTRATION |
AVAILABILITY 55%
BS in Civil Engineering, University of Colorado, Boulder | CA PE C48667, TE C2254 » Over 30 years of experience in transportation and municipal engineering projects. » His Federal funding management experiences includes: HBRR, STPL, HES, IMD, SRTS, Seismic, Discretionary, and ARRA, HSIP, and BTA.
» He has served as Interim City Engineer, Public Works Director, City Traffic Engineer, and provided City Staff Support.
Bill’s professional design experience includes traffic management/project control, traffic operation systems, communication systems, incident and verification systems, traffic studies, traffic management plans, planning studies, highway design, arterial design, local street design, and municipal engineering. He has also provided project management, project engineering, and design for several state and local highway/roadway projects that include traffic operation and communications systems, interchanges, and major intersections. He also has extensive experience in the production and preparation of PS&E projects. Recent projects include:
» On-Call Traffic Engineering, Signal Hill
» On-Call Civil and Traffic Engineering, Seal Beach
» Interim City Engineer, Norwalk
» Traffic Engineering Services, Mission Viejo
CITY OF MONTEBELLO ON-CALL ARCHITECTURAL AND ENGINEERING
DESIGN SERVICES
MARK THOMAS
ADDITIONAL SUPPORT STAFF
In addition to the key staff listed above, the table below shows the additional staff that will be available. We have expanded our team to provide a deeper bench of resources during this unusual period of staff and resource shortages. Mark Thomas has confirmed that the availability of the team members selected for this on-call contract, listed on the organizational chart and below, have availability ranging from at least 50% up to 90% for the duration of this contract, and are bolstered by over 60 staff in our Southern California offices and 300 company-wide staff, in addition to the services provided by our subconsultants, which allows us to staff task orders as they arise.
TEAM MEMBER
& ROLE
EDUCATION,
LICENSE, & YEARS
OF EXPERIENCE
RECENT SIMILAR EXPERIENCE
Darin Johnson, PE
Project Director
BS in Civil Engineering
North Dakota State University
CA PE C46405
38 years of experience
» Limonite Avenue Gap Closure, Eastvale
» McKinley Street Grade Separation, Corona
» On-Call Professional Consultant Services, Yorba Linda » Long Beach Boulevard Green Street Improvements, South Gate Kimberly Barling
Roadway
BS in Civil Engineering
University of California, Irvine
CA PE C92279
7 years of experience
» On-Call Professional Engineering Services, Yorba Linda » Firestone Boulevard Widening, Norwalk
» Long Beach Boulevard Green Street Improvements, South Gate » Turnbull Canyon Road Grade Separation, Industry
» Limonite Avenue Gap Closure, Eastvale
Ashley Lee
Roadway
BS in Civil Engineering
University of California, Irvine
CA PE C88128
9 years of experience
» Firestone Boulevard Widening, Norwalk
» Standard Avenue Bike Lanes, Santa Ana
» Brea Canyon Road WIdening, Orange County
» Long Beach Boulevard Green Street Improvements, South Gate Ravi Shah, PE
Caltrans Design/
Coordination
BS in Civil Engineering
California Polytechnic State
University, Pomona
CA PE C79183
15 years of experience
» Bayside Drive Improvements, Newport Beach
» On-Call CIP Support Services, Orange County
» Brea Canyon Road Widening, Orange County
» SR-47/Front Street/Harbor Boulevard Interchnage Improvements, Los Angeles
Bo Burick, PE
Caltrans Design/
Coordination
MS in Civil Engineering
University of California, Irvine
CA PE C60456
23 years of experience
» I-605 Hot Spots Study, Metro, Caltrans
» I-215/Harley Knox Interchange, Perris
» I-15 Congestion Relief, Temecula
» On-Call Engineering Support Services, Orange County
» Capital Improvement Project Program Management, Orange County Ricky Chan, PE, TE,
PTOE
Traffic Engineering
BS in Civil Engineering
University of California, Irvine
CA PE C71389
CA TE TR2673
PTOE 3685
» Raymond Avenue/Pico Street Traffic Signal Modification, Pasadena » Walker Street/Delong Street Traffic Signal and Interconnect, Cypress » Highland Avenue/Mango Avenue Traffic Signal, Fontana
» MacArthur Boulevard/University Drive Rehabilitation, Newport Beach » SR-60/Archibald Avenue Interchange, Ontario
Ray Kommidi, PE,
TE -LIN CONSULTING
Traffic Engineering
MS in Civil Engineering
Clemson University
CA PE C76481
CA TE 2591
18 years of experience
» Westside Purple Line Extension Section 2 and 3, Los Angeles » Exposition Light Rail Transit, Los Angeles
» Montebello Avenue Grade Separation Traffic Study, Montebello » Traffic Signal Design, Glendale
» Puente Avenue Grade Separation, Los Angeles
Bobby Lin, PE
Transit Systems
BS in Civil Engineering
University of California, Irvine
CA PE C85563
10 years of experience
» Systemic Safety Analysis Report, Montebello
» On-Call Civil Engineering Consulting Services, Walnut Creek » OC Loop Segment D, Orange County
» Marin Transit On-Call Engineering Services, Marin County » Contra Costa County On-Call, Contra Costa County
CITY OF MONTEBELLO ON-CALL ARCHITECTURAL AND ENGINEERING
DESIGN SERVICES
MARK THOMAS
TEAM MEMBER
& ROLE
EDUCATION,
LICENSE, & YEARS
OF EXPERIENCE
RECENT SIMILAR EXPERIENCE
Jesseca Martinez
Transit Systems
BS in Civil Engineering
University of California, Irvine
6 years of experience
» Doran Street Grade Separation, Glendale
» OC Streetcar, Santa Ana
» Anaheim Canyon Station, Anaheim
» Brighton to Roxford Double-Track, Metro
Flora Diaz, PE, QSD
Drainage/Stormwater
BS in Civil Engineering
University of California, Los
Angeles
CA PE C90445
QSD 90445
8 years of experience
» Chakemco Street Improvements, South Gate
» Long Beach Boulevard Green Street Improvements, South Gate » Firestone Boulevard Widening, Norwalk
» Long Beach Boulevard Green Street Improvements, South Gate » OC Loop Segment O, P, Q, Orange County
Mazen Mneimneh,
PE, QSD
Construction Support &
Management
MS in Engineering
Management Santa Clara
University
BS in Civil Engineering
Beirut Arab University
CA PE C65560
QSD 06556
» Firestone Boulevard Bridge Replacement, Norwalk
» “The Boulevard” Firestone Boulevard Regional Corridor Enhancement, South Gate
» Central Avenue Project, Montclair
» Gerald Desmond Bridge, Long Beach
Zeki Kayiran, PE -AKM
CONSULTING ENGINEERS
Pump/Lift Stations
MS in Civil Engineering
California State University,
Long Beach
CA PE C29330
48 years of experience
» Lift Stations 2, 3, and 7, Alhambra
» Pump Station 2, 3, and 6, Camarillo
» Pump Station 35 and 8th Street, Seal Beach
» Lift Station C and Edgewater Sewage Lift Station, Huntington Beach » Pump Station 1 and 7, El Segundo
Robert Vasquez, PE
Utility Design/
Coordination
BS in Civil Engineering
California State Polytechnic
University, Pomona
CA PE C74012
16 years of experience
» Limonite Avenue Gap Closure, Eastvale
» Non-potable Water Line Improvements, Jurupa Valley
» On-Call Transit Connector, Inglewood
» McKinley Street Grade Separation, Corona
» Wildomar Cemetery ADA/Palomar Widening, Wildomar
Julie Passalacqua,
PE
Structures
MS in Civil Engineering
University of California, Davis
CA PE C68407
19 years of experience
» McKinley Grade Separation, Corona
» Nuevo Road Bridge Reconstruction, Riverside County
» Brea Canyon Road Widening, Orange County
» OC Loop Segment O, P, Q, Orange County
Trisha Keith, PE
Plan Checking
BS in Civil Engineering
University of California, Irvine
CA PE C62490
24 years of experience
» Long Beach Boulevard Green Street Improvements, South Gate » On-Call CIP Projects, Orange County
» On-Call Roadway and Bikeway Engineering, Orange County » Walnut Avenue/The Mall Traffic Signal Improvements, Irvine Steven Heise, PLS
Surveying
BS in Geomatics
British Columbia Institute of
Technology
CA PLS 8777
25 years of experience
» Long Beach Boulevard Green Street Improvements, South Gate » On-Call Transit Connector, Inglewood
» On-Call Surveying PG&E, Sacramento
» Bake Parkway/Jeronimo Road, Irvine
» On-Call Southern California Edison, Southern California Lam Le, PLS -CL
SURVEYING
Surveying
BS in Aerospace Engineering
California Polytechnic State
University, Pomona
PLS 8231
25 years of experience
» Caltrans District 8 On-Call Surveying Services, San Bernardino and Riverside Counties
» Caltrans District 7 On-Call Surveying Services, Los Angeles County
CITY OF MONTEBELLO ON-CALL ARCHITECTURAL AND ENGINEERING
DESIGN SERVICES
MARK THOMAS
TEAM MEMBER
& ROLE
EDUCATION,
LICENSE, & YEARS
OF EXPERIENCE
RECENT SIMILAR EXPERIENCE
Edward Lok, Arch,
LEED AP -BOA
Building Improvements
B of Arch.
University of Hawaii
CA Arch C16840
38 years of experience
» On-Call, Pasadena
» On-Call, San Bernardino
» On-Call, Cypress
Marty Armstrong,
PLA
Landscape Architecture
BS in Landscape Architecture
California Polytechnic State
University, San Luis Obispo
CA RLA 4607
28 Years of experience
» Chakemco Street Improvements, South Gate
» Firestone Boulevard Widening, Norwalk
» Long Beach Boulevard Green Street Improvements, South Gate » Brea Canyon Road Widening, Orange County
» Limonite Avenue Gap Closure, Eastvale
Michael Aceves,
RIA, ASLA -TATSUMI &
PARTNERS
Landscape Architecture
BS in Landscape Architecture
California Polytechnic State
University, Pomona
CA RLA 2033
43 years of experience
» Montebello Riverbed Restoration Project, Montebello
» Grant Rea Park, Montebello
» San Gabriel River Bike and Pedestrian Trail Bridge, Long Beach » Atlantic Boulevard Bridge Replacement, Vernon
Maria YanezForgash -ARELLANO
ASSOCIATES
Community Outreach
MA Public Administration
California State University,
Fullerton
22 years of experience
» LA Metro Eastside Transit Corridor Phase 2, San Gabriel Valley » Rail to River Active Transportation Corridor, Los Angeles » LA Metro Micro Pilot Program, Los Angeles County
Alahesh
Thurairajah, PE, GE
-EARTH MECHANICS
Geotechnical
MS in Civil Engineering
University of California, Los
Angeles
CA PE 81439
CA GE 3123
13 years of experience
» Rosecrans/Marquadt Grade Separation, Santa Fe Springs » Kelvin Pedestrian Bridge, Irvine
» Crown Valley Parkway Widening, Laguna Niguel
Byron Cazar, PLS
Right of Way
Engineering
BS in Civil Engineering Pontific
Catholic University
CA PLS 9337
21 years of experience
» McKinley Street Grade Separation, Corona
» On-Call Transit Corridor, Inglewood
» Bake Parkway/Jeronimo Road, Irvine
» Standard Bike Lanes, Santa Ana
Daniela Borbe
-MONUMENT ROW
Right of Way
Acquisition
BA in Administration
Babes Bolyai, Romania
20 years of experience
» Whittier Boulevard and Beach Intersection, La Habra
» Nason Street Widening, Moreno Valley
» North Street Viaduct, Tustin
Jennifer Johnson
-GPA
Regulatory Permitting
BS in Marine Biology
California State University,
Long Beach
14 years of experience
» 6th Street Viaduct Replacement, Los Angeles
» Firestone Boulevard Bridge Widening Over San Gabriel River, Norwalk
» City of Hope Storm Drain Infrastructure, Irwindale
Ryan Bissegger
Funding Support
BA in International Business
Westminster College
18 years of experience
» Third Street Grade Separation TCEP Application, Riverside » Limonite Gap Closure SB-1 LPP Grant Application, Eastvale » OC Loop Segments O, P, Q, ATP Grant Applications, Orange County » Santa Ana Grade Separation RAISE Grant Application, Santa Ana
CITY OF MONTEBELLO ON-CALL ARCHITECTURAL AND ENGINEERING
DESIGN SERVICES
MARK THOMAS
PROJECT EXPERIENCE
Mark Thomas has significant experience providing on-call services for local agencies. We understand the importance of being flexible and responsive when meeting project needs. We consider ourselves experts in providing task order driven services with limited budgets and reduced schedules. Over the years we have found that the cornerstone of a successful project is for us to operate as an extension of City staff. Our longevity and local experience serve as clear evidence that we know how to manage and deliver projects. A sampling of our on-call contracts is shown below.
City of Anaheim
On-Call Engineering Services
City of Brentwood
On-Call General Civil and Survey
City of Concord
On-Call Survey Services (Various
Projects)
City of Cupertino
On-Call General Civil
City of Davis
On-Call General Civil Engineering
City of Dublin
On-Call Engineering Services
City of Fullerton
On-Call Engineering Services
City of Gilroy
Streets, Trails and Sidewalks
City of Irvine
Consultant Team Program
City of La Mirada
On-Call Engineering Services
City of Lincoln
On-Call Engineering Services
City of Menlo Park
On-Call Professional Services
City of Moreno Valley
On-Call Professional Services
City of Placerville
On-Call Engineering Services
City of Pleasanton
On-Call Transportation Services
City of Pomona
On-Call Engineering Services
City of Rancho Cordova
On-Call Consulting Services
City of Redwood City
On-Call Civil, Survey Services and
Structural
City of Roseville
On-Call Engineering
City of Sacramento
On-Call Civil Engineering, OnCall Surveying Services (Separate Contracts)
City of San Jose
On-Call Trail Design Services, OnCall Surveying Services (Separate Contracts)
City of San Jose Water Company
On-Call Structural Services, On-Call
Survey Services (Separate Contracts)
City of Santa Ana
On-Call Professional Services
City of South San Francisco
On-Call Civil Engineering Services,
On-Call Survey Services (Separate
Contracts)
City of Vallejo
On-Call Consulting Services
City of Walnut Creek
On-Call Consulting Services
City of Yorba Linda
On-Call Consulting Services
Contra Costa County Public
Works
On-Call Civil and Structural
Engineering (Separate Contracts)
Calaveras County
On-Call Construction Management
Fresno County
On-Call Engineering
LAX
On-Call Right of Way Services
Monterey County
On-Call Survey Services
Napa County Transportation &
Planning Agency
On-Call Engineer/Architect & Project
Delivery Services
Orange County
On-Call Road and Bridge Services
Placer County
On-Call Engineering Services
Riverside County
On-Call Engineering Services
San Bernardino County
On-Call Engineering Services
San Mateo County Transit District
On-Call Engineering Services
On-Call Construction Management
Santa Clara Valley Water District
On-Call Structural Engineering
Sonoma County
On-Call Engineering Services
Santa Clara County, Road and
Bridges Dept.
Civil Design and Structural Engineering
On-Call Construction Management
Trinity County Department of
Transportation
On-Call Engineering Services
Tuolumne County Department of
Public Works
On-Call Engineering Services
Union City
On-Call Engineering Services
CITY OF MONTEBELLO ON-CALL ARCHITECTURAL AND ENGINEERING
DESIGN SERVICES
MARK THOMAS
CLIENT
City of Corona
PERIOD OF PERFORMANCE
2019-present
KEY STAFF
Josh Cosper
MCKINLEY GRADE SEPARATION PROGRAM
MANAGEMENT
CORONA
Mark Thomas is providing comprehensive program management services for the City of Corona to construct a grade separation facility over the Burlington Northern Santa Fe (BNSF) tracks south of SR 91. The project includes improvements along McKinley Street from Magnolia Avenue to the SR 91 eastbound off ramps, including installation of a steel tied arch bridge structure crossing the railroad.
Mark Thomas was responsible in securing over $18 million since 2020 through the Trade Corridor Enhancement Program (CTC), Highway Railroad Crossing Safety Account (CTC), and Section 190 Grade Separation Program (CPUC) closing the deficit from the original funding procured by the City. Additionally, Mark Thomas was responsible for developing programmatic project cost estimates and projections through construction that included risk analysis/ mitigation, escalation/inflation analysis, and sources of funding (8 total) for the $112 million project.
Mark Thomas was also responsible for plan checking the design consultants improvement plans and calculations, coordination for approvals with Riverside County, City of Riverside, Riverside County Flood Control, and Caltrans.
Additionally, Mark Thomas was responsible for the oversight of the $25 million acquisition program with approximately 15 impacted properties. Mark Thomas also lead utility relocation efforts, including the development of utility agreements, for the ten utility owners within the Project limits.
CLIENT
City of Montebello
PERIOD OF PERFORMANCE
2021-2022
KEY STAFF
Pat Somerville
Paul Martin
SYSTEMIC SAFETY ANALYSIS REPORT
MONTEBELLO
Mark Thomas prepared a Systemic Safety Analysis Report for the City of Montebello. The report involves analyzing crash history throughout the jurisdiction and identifying key intersections and roadway segments for further analysis. The analysis will include identification of safety countermeasures and preliminary benefit cost ratios. The project also involves preparing 30% designs and cost estimates for the recommended projects.
CITY OF MONTEBELLO ON-CALL ARCHITECTURAL AND ENGINEERING
DESIGN SERVICES
MARK THOMAS
CLIENT
Orange County
PERIOD OF PERFORMANCE
2018-present
KEY STAFF
Paul Martin
Josh Cosper
COUNTY OF ORANGE ON-CALL
ORANGE COUNTY
Mark Thomas has been providing on-call support for the County of Orange as a qualified vendor, for multiple on-call contracts. Within the last 2 years we have delivered over 13 task orders with services including roadway geometrics, signing and striping, drainage design, bridge type selection, and PS&E documents as well as the development of reports and grant applications. A sampling of task order projects that Mark Thomas has completed throughout the course of the on-call include:
Modjeska Grade Road Improvements
Modjeska Grade Road is an approximately 1.3-mile, two-lane rural highway connecting southern Orange County with the Tucker Natural Preserve and Birds Watching Sanctuary via Santiago Canyon Road. The proposed project addresses critical pavement and drainage deficiencies along Modjeska Grade Road while balancing community aesthetics and maintaining the rural community character. Our design team is working closely with the County to develop 35% plans that improve drainage and reduce erosion while minimizing the frequent maintenance currently required by the County.
John Wayne Airport
Mark Thomas is providing design and construction support to John Wayne Airport (JWA) for the development of design and construction documents for multiple landslide projects as part of JWA’s asset management program.
Mark Thomas delivered four critical maintenance projects within 5 months, which included the visual inspection, assessment and evaluation of multiple bridge structures (including confined space entry); roadway elements including pavement rehabilitation, striping and ADA enhancements; and obtaining Caltrans Encroachment Approval through District 12 for the overlay of an existing sign to the remote parking facility along Main Street.
Silverado Canyon Road Bridge Replacement
Mark Thomas is providing PS&E for the replacement of the Silverado Canyon Road Bridge over Ladd Creek. The project improvements include widening the existing undivided two lane roadway to a four-lane divided roadway, replacing the three existing bridges over the Brea Canyon Channel, rehabilitating the existing channel, constructing permanent retaining walls up to 65 feet high, and replacing the traffic signal at Canyon Country Road.
Grant Application Assistance
Mark Thomas provided grant application assistance for the OC Loop Segment O Cycle 4 ATP applications in May 2018. In addition to the grant application, the team prepared 20% plans and cost estimates for Segment O and Segment O, P, Q for the grant application and to assist the County with railroad coordination.
Mark Thomas is also currently providing grant application assistance for the OC Loop Segment O and Segments O, P, Q for the Cycle 5 ATP applications, assisting the County with seeking support letters for local agencies and updating the Segment O and Segment O, P, Q plans and cost estimates. “Mark Thomas has provided a variety of engineering services for Orange County Public Works. The firm has consistently met or exceeded expectations on all tasks. Client satisfaction and their responsiveness are major strengths.”
- Regina Hu, former Orange County Public Works
Silverado Canyon
JWA ADA Improvements
CITY OF MONTEBELLO ON-CALL ARCHITECTURAL AND ENGINEERING
DESIGN SERVICES
MARK THOMAS
CLIENT
City of Irvine
PERIOD OF PERFORMANCE
2010-present
KEY STAFF
Pat Somerville
CITY OF IRVINE ON-CALL
IRVINE
Walnut Avenue/The Mall Traffic Signal Improvements
Mark Thomas is providing final design of a new traffic signal and bicycle and pedestrian improvements at the Walnut Avenue/The Mall intersection in the City of Irvine. This heavily traveled roadway provides the community with connections to two residential neighborhoods, local neighborhood parks, and an elementary school. Proposed improvements include a new traffic signal as well as striping enhancements, median modifications, bike lane extensions, and ADA ramp updates to enhance safety and improve the bicycle and pedestrian route to a nearby school.
Bake Parkway/Jeronimo Road Intersection Widening
The City of Irvine (City) selected Mark Thomas to prepare a project report and environmental document (PR/ED) for the proposed intersection improvements at Bake Parkway and Jeronimo Road. This intersection is bordered between cities of Irvine and Lake Forest. The proposed improvements include addition on adding one additional left turn for northbound Bake Parkway, one additional left turn for westbound Jeronimo Road, and on-street bike lanes for all 4 directions of the intersection. This intersection improvements were originally identified in the North Irvine Transportation Mitigation (NITM) and Lake Forest Transportation Mitigation (LFTM) programs.
As part of the PR/ED, Mark Thomas is working with both cities of Irvine and Lake Forest to develop a preferred project alternative to provide the required improvements that satisfy the current traffic needs, compatible with the NITM program updates, as well as minimize the potential impacts for the surrounding areas. The project geometrics will also evaluate both standard and nonstandard roadway widths, ADA compliance, identify right of way impacts, on-street Class II bike lanes for all 4 directions of the intersection, utilities impacts, drainage impacts, and prepare a project specific preliminary water quality management plan (WQMP). An Initial Study/Mitigated Negative Declaration (IS/MND), with the appropriate technical studies will also be prepared for this intersection improvement.
Jeffrey Road/Irvine Center Drive Widening
Mark Thomas is preparing the PS&E for the widening of the Jeffrey Road/Irvine Center Drive (ICD) intersection. The improvements will add capacity in the northbound, southbound and westbound through movements while adding storage capacity for selected left and right turn movements. Class II bicycle facilities will be provided in each direction with the lanes extending to the intersection. Pedestrian safety is enhanced through the removal of a free right turn movement and converting that to a standard right turn pocket.
Extensive utility coordination is required with the relocation of a SCE 220kV electrical transmission tower as well as underground electrical vaults. Numerous communication manholes are impacted and both domestic and reclaimed water facilities will require relocation. Hydrology, hydraulics and a Water Quality Management Plan (WQMP) are being provided along with modifications to the existing storm drain system due to the widening. A community outreach meeting will be held and an extensive business outreach effort is being provided due to the construction impacts of the adjacent shopping center.
Walnut Avenue/The Mall
CITY OF MONTEBELLO ON-CALL ARCHITECTURAL AND ENGINEERING
DESIGN SERVICES
MARK THOMAS
CLIENT
City of Santa Ana
PERIOD OF PERFORMANCE
2018-present
KEY STAFF
Paul Martin
Patrick Somerville
ON-CALL ENGINEERING SERVICES
SANTA ANA
Mark Thomas is currently providing the City of Santa Ana with on-call engineering services. Task order projects that Mark Thomas has completed throughout the course of the on-call include:
Standard Avenue Bike Lanes
The City of Santa Ana continues to advance active transportation projects to better serve the community and enhance traffic safety. The Standard Avenue Bikeway Project was developed collaboratively with the community and formalized in the Central Santa Ana Complete Streets (CSACS) Plan. It addresses multimodal mobility needs with high-quality public space improvement.
Mark Thomas is leading the preparation of engineering design plans (PS&E) to right-size and reconfigure two miles of Standard Avenue from Warner Avenue to First Street. The project includes buffered bicycle lanes, separated bikeways, and shared use bicycle routes as well as green conflict striping, crosswalks, and landscaping. The project will include the first protected intersection design within the City at Standard Avenue/McFadden Avenue and continue to anchor Santa Ana as a community that delivers mobility solutions for the residents.
Our team is leading the community engagement, stakeholder coordination, and final design of this important backbone corridor for travel north-south within the City. The future facility provides enhanced connectivity to four parks, four elementary schools, local commercial stores, residential properties, and employment centers. Public engagement has included pop-up tabling events, digital and print media promotion, and one public workshop in July 2021.
Warner Avenue Improvement and Widening Phase I
Mark Thomas is providing design services to the City of Santa Ana for the widening of Warner Avenue, from Main Street to Oak Street. The project will widen the roadway from a four-lane undivided arterial to a six-lane divided arterial to conform to the City and County Arterials Master Plan. The project includes improvements to the Main Street intersection as well as five residential streets. The project also includes landscape improvements and permanent water quality improvement features within the parkway areas. A major component of the project is the installation of drainage infrastructure. The existing storm drainage system carries a major watershed system within a 66-inch RCP. The replacement system will be upsized to a 18-foot by 9-foot reinforced concrete box that will tie into the existing system downstream. Per the City’s direction, we refined the design to include a curb separated Class IV protected bike lane, a first within Orange County. The Class IV will serve to connect to the regional Pacific Electric Bicycle Trail Class I. This has required the evaluation of driveway consolidations in order to provide a more comfortable facility for bicyclists. Due to funding constraints, the project is being delivered on an expedited schedule.
Standard Avenue
Warner Avenue
CITY OF MONTEBELLO ON-CALL ARCHITECTURAL AND ENGINEERING
DESIGN SERVICES
MARK THOMAS
CLIENT
Sacramento Regional Transit District
PERIOD OF PERFORMANCE
2019-present
SACRAMENTO REGIONAL TRANSIT DISTRICT ONCALL
SACRAMENTO COUNTY
Mark Thomas is providing on-call engineering services for SacRT. Task orders under this contract include the following:
Electric Vehicle Charging Station
Mark Thomas was responsible for the preparation of civil and structural design plans and details for two phases of an electric bus charging station near the SacRT Administrative building. Mark Thomas is conducting a topographic survey and base map to identify pad locations for equipment mounting of the site.
Mark Thomas also coordinated with M. Neils Engineering on the development of the electrical plans for the charging station.
I-80/Watt Avenue Transit Center Station Design
Mark Thomas is currently working with Sacramento Regional Transit District (Sac RT) under the General Engineering Support Services (GESS) contract to support development of the Watt Avenue/I-80 Station Master Plan. For this effort, we are working with Sac RT and Walk Sacramento to provide engineering and architecture design support to prepare graphics showing site opportunities and constraints and potential improvement alternatives to support public outreach efforts and develop the Master Plan report. The existing Watt Avenue/I-80 Transit Center was constructed 30 years ago and includes two light rail stations and bus transfer points in the median area of I-80 between Watt Avenue and Roseville Road. The facility also incorporates substantial park and ride facilities with direct vehicle connections to I-80, and stairways and elevator connections for pedestrians on the Watt Avenue overcrossing. In July 2017, SacRT Police conducted a Crime Prevention Through Environmental Design (CPTED) review of the Watt I-80 Station and developed a number of recommendations for mitigating several safety and security issues at the station.
Dos Rios Station Design Ph I
Mark Thomas is providing general engineering and design, and landscape architecture services for preparation of design development drawings and construction documents for the new SacRT Dos Rios light ration station north of downtown Sacramento. Key features of the project include realigning the light rail tracks and extending the double-track light rail systems including communication, OCS and signaling through the new station platforms. Their design includes modifications to existing roadways, parking lots, storm drain facilities, and existing City utilities. Mark Thomas is also providing support for right of way acquisition, utility coordination, and surveying. Mark Thomas’ landscape architecture and urban design (LAUD) team is leading urban design and aesthetic site enhancements of the project to meet the needs of the key features identified by SacRT, while keeping maintenance considerations and budgets in mind. This project is funded by federal and local grants. Phase 1 includes preparation of design development plans based on a previously developed architectural concept for the station. Phase 2 includes completion of the final design and preparation of construction bid documents.
I-80/Watt Avenue Transit
Center
Dos Rios Station
OUND I-80
EASTBOUND I-80
AVENUE
WATT
ORANGE GROVE AVENUE
11 12
13 13
13 14
15 16
17 2 3 4
5 6
7 8 8 9
10
CITY OF MONTEBELLO ON-CALL ARCHITECTURAL AND ENGINEERING
DESIGN SERVICES
MARK THOMAS
CLIENT
City of Montebello
PERIOD OF PERFORMANCE
2019-present
KEY STAFF
David Tatsumi
GRANT REA PARK - TATSUMI & PARTNERS, INC.
MONTEBELLO
Tatsumi and Partners was retained to provide the designs for a new irrigation system for the entire park, new sports lighting for the seven ball fields, and relocation of equestrian facilities. The only special problem encountered was the need to consolidate water and electrical power sources. Due to the age of the park, over the years as additional facilities were added, numerous sources of water and power were also added. For this project, the city desired to consolidate these numerous sources into one source for irrigation water and one source for electrical power. This was accomplished with the proper engineering and coordination with the utility companies. This was all performed in partnership with City staff. All PS&E documents were produced electronically to the City’s standards.
CITY OF MONTEBELLO
ON-CALL ARCHITECTURAL AND ENGINEERING DESIGN SERVICES
RESUMES
CITY OF MONTEBELLO ON-CALL ARCHITECTURAL AND ENGINEERING
DESIGN SERVICES
MARK THOMAS
PAT SOMERVILLE, PE
PROJECT MANAGER
EDUCATION
BS in Civil Engineering
REGISTRATION
CA C56141
Pat has over 36 years of experience in civil engineering and management with a focus on municipal transportation and other complex capital improvement projects. He brings proven consensus building skills. He is adept at public presentations at City Council, Commission or community outreach meetings. He actively engages third parties, including regulatory agencies, utility companies, Class I and commuter rail and CPUC, coordinating early and often through the project life cycle. He brings extensive arterial highway widening experience with a proven on time project delivery.
REPRESENTATIVE PROJECTS
SYSTEMIC SAFETY ANALYSIS REPORT, MONTEBELLO
Lead civil engineering team for the preparation of a
Systemic Safety Analysis Report for the City of Montebello.
The report involves analyzing crash history throughout the jurisdiction and identifying key intersections and roadway segments for further analysis. The analysis will include identification of safety countermeasures and preliminary benefit cost ratios. The project also involves preparing 30% designs and cost estimates for the recommended projects.
ON-CALL ENGINEERING SERVICES, FULLERTON
Project manager providing on-call services for the city.
Efforts have included the conceptual and final design
services for the annual sewer replacement program
for three consecutive years, providing surveying and
geotechnical services, performing third-party peer and
constructibility review on a grade separation project, and a feasibility study for retaining walls at Lion’s Field in order to determine the most cost-effective solution for retaining up to 35-feet of slope excavation.
FIRESTONE BOULEVARD WIDENING, NORWALK
Project Manager for the widening of Firestone Boulevard from Studebaker Road to Imperial Highway. The widening
will provide a third northbound lane, Class II bike lanes, and sidewalk on the southbound side of the street. The
bridge over the UPRR tracks will be widened. Additionally, the project included modifications to four traffic signals, new retaining walls and landscape/complete street
improvements throughout. Utility relocation coordination for more than ten utility owners was required.
AS-NEEDED CIVIL ENGINEERING SERVICES, LONG
BEACH
Project Manager. Over a nine-year period and across five different contracts, Pat delivered over 30 separate projects totaling over $40 million in construction. Work included residential street reconstruction, rehabilitation of arterial highways, extensive cross-sectional analysis for pavement strategy, installation or full replacement of curb and gutter, and over nine miles of new landscaped median\ islands.
Additionally, task orders included new and upgraded storm drain systems, pump station modifications and stormwater treatment implementation. Responsible for presenting the project in detail at public informational and project area committee board meetings.
ON-CALL ENGINEERING SERVICES, SANTA ANA
Project manager for engineering services in support of the City’s capital improvement program. Delivered over 20 task orders that included analysis and design for city owned parking structures, stadiums, parking lots and parks; arterial and residential street rehabilitation projects, building improvements at Thornton Park, fountain upgrades at
the Civil Center plaza and a freeway on-ramp widening.
Also worked part-time at City Hall for a 12 month period managing other consultant led CIP projects.
COMPLETE STREETS PROGRAM, LOS ANGELES
Project manager for the design of the first six street
corridors in this program, totaling 22 miles. This
inaugural $84M program implemented LADOT Vision
Zero elements. Pat participated in weekly and bi-weekly meetings with representatives from multiple City of Los Angeles departments including, LABOE, LA Department
of Transportation (LADOT), StreetsLA, Bureau of Street
Lighting (BSL), Urban Forestry Division (UFD), LA Sanitation (LASAN), and Bureau of Contract Administration (BCA).
The marquee project is Avalon Blvd., which will enhance mobility for all modes of travel with protected bike lanes, bus boarding islands, and accessibility and sidewalk
improvements.
CITY OF MONTEBELLO ON-CALL ARCHITECTURAL AND ENGINEERING
DESIGN SERVICES
MARK THOMAS
JOSH COSPER, PE, QSD, PLS
QA/QC, PLAN CHECKING
EDUCATION
BS in Civil Engineering
REGISTRATION
CA C71667
CA QSD 00709
PLS 8774
Josh has more than 18 years of experience as a successful project manager on numerous complete streets, transportation and roadways projects providing project management, planning, and final design services. His passion includes providing innovative solutions on active transportation and complete streets projects and roadway widening infrastructure projects.
He has also led over 50 miles of transportation corridor improvements as either the right of way, utility, drainage and/or civil lead.
REPRESENTATIVE PROJECTS
LIMONITE AVENUE GAP CLOSURE, EASTVALE
Project manager responsible for the preparation of
roadway, pedestrian and bridge widening improvements
(four lanes) to a one-mile segment of Limonite Avenue
from Hellman Avenue in the City of Chino to Archibald
Avenue. The project includes over 2 miles of bike
lanes/multiuse trails, a pedestrian bridge providing
connectivity to a Citywide trail system, a three span
bridge structure, coordination with the US Army Corp
of Engineers for MS 404/408 approvals, development
of a multi-lane roundabout, and assistance to the City
in the adoption of project specific design and safety
standards to accommodate pedestrian/multimodal friendly improvements. Josh was responsible for all facets of project delivery from preliminary design through final design.
MCKINLEY GRADE SEPARATION, CORONA
Program manager responsible for management of the
design and right of way consultant firms developing
improvement plans for a grade separation over the
existing at-grade BNSF railroad crossing. This $130 million project includes over 1 mile of roadway improvements,
new bike and pedestrian improvements a steel tied arch
bridge crossing the BNSF railroad and Temescal Canyon
Channel through a major commercial/industrial hub in the City of Corona. Project includes management of over 10
complex partial property acquisitions, coordination with utility companies/CPUC/BNSF, securing over $15 million in funding and the delivery of the overall project. Josh was also responsible for identifying numerous acquisition and utility relocation strategies saving the City over $7 million in program costs.
PALOMAR COMPLETE STREETS, WILDOMAR
Project manager responsible for the preparation of this complete streets project in the Old Town area of Wildomar along Palomar Street from Wildomar Trail to Gruwell Street.
This project included approximately 1 mile of roadway
widening, a Class I trail system, buffered Class II lanes, and landscape/beautification improvements to renovate the
Wildomar Cemetery frontage. This project also included
enhanced crosswalks features and substantial upgrades
to non ADA compliant features. Josh assisted the City in developing new design standards and guidelines for the
trail features and led community presentations during the preliminary design/feasibility analysis.
HEACOCK STREET EXTENSION, MORENO VALLEY
Project manager responsible for the preliminary and
final design of this phased roadway, pedestrian, and
bicycle improvement project along Heacock Street from
Harley Knox Boulevard to Catcus Avenu. The project
included over 3.6 miles of roadway and bridge widening
improvements and a combination of Class II bike lanes,
trail improvements, and safety features as part of the street widening and rehabilitation improvements. The project
also included regulatory agency approvals and permits
from USACE, CDFW, and SWRCB. Additionally, Josh was
responsible for utility coordination/relocation planning for close to 10 utilities, development of a conceptual multi-lane roundabout, bridge
CITY OF MONTEBELLO ON-CALL ARCHITECTURAL AND ENGINEERING
DESIGN SERVICES
MARK THOMAS
ALAN SU, PE
ROADWAY
EDUCATION
BS in Civil Engineering
REGISTRATION
CA C66042
Alan has more than 20 years of diverse engineering experience in the transportation field. He has multi-use trails and local road improvement experience throughout Southern California, and as well as significant planning and engineering experience with Caltrans on the state highway system. He is known for his client service approach to successful project delivery with both public and private clients. His experience includes preliminary engineering to final design.
REPRESENTATIVE PROJECTS
IRVINE CENTER DRIVE AND JEFFREY ROAD
INTERSECTION IMPROVEMENTS, IRVINE
Project manager responsible for developing a project
report and environmental documents for the Jeffrey Road/ Irvine Center Drive (ICD) intersection improvements.
Services included developing three project alternatives, a traffic study analysis, environmental document, WQMP, and cost estimates. Based on the developed alternatives, Alan worked with the City staff and PDT members on
selected a preferred alternative based on the least
right of way impacts and as well as fulfilled the need
of the NITM program. Tasks included providing project
management, research and review, aerial topographic
mapping, traffic analysis, preliminary design, project report preparation, photo simulations, a preliminary water quality management plan, and environmental document support.
STANDARD AVENUE BIKE LANES, SANTA ANA
Senior engineer leading the design for the project
to redesign two miles of Standard Avenue to include
buffered bike lanes, cycletrack, and bicycle boulevard. Key challenges being addressed through the project include
on-street parking preservation, sight distance analysis, constrained right-of-way, protected intersection design, utility and drainage impacts, transit operations at the intersection, and storm drain and power pole relocations.
TECHNOLOGY DRIVE EXTENSION, IRVINE
While at a previous firm, Alan Su, was responsible for
providing engineering services for the Irvine Company
Community Development (ICCD) to develop engineering
plans for the Technology Drive Extension project in the City of Irvine. The project included extending Technology Drive from an existing cul-de-sac and tied into the existing Laguna Canyon Road for approximately 3,300-feet of
roadway. In addition to the roadway extension, a tie-back retaining wall under the existing I-5 overcrossing bridge was required to provide enough space to accommodate
the required roadway width. Additionally, the Technology Drive Extension Project also included new sewer line,
domestic and non-domestic waterlines for Irvine Ranch
Water District (IRWD).
BASTANCHURY DRIVE EXTENSION, YORBA LINDA
Project Manager responsible for final PS&E design services for the proposed Bastanchury Road improvements
between Eureka Avenue and Casa Loma Avenue. Services
included geometric alternatives developments that would widen the existing Bastanchury Road to provide a total of 4 lanes (2 lanes in each direction) to match the existing condition on the east side of Eureka Avenue and west side of Casa Loma Avenue, provide 5-foot on-street bike lanes, curb adjacent sidewalk on the northerly side of the road, and Class 1 multi-purpose trail on the southerly side of the road. To meet the Modified Primary Arterial Highway requirements, the proposed project also included raising the existing roadway profile of approximately 6 feet at the current sump location. This will improve the existing sight distance deficiencies for both the eastbound and
westbound traffic on Bastanchury Road within the project limits. Additionally, the proposed improvements would
also accommodate the proposed future developments
on the north side of Bastanchury Road. Additional design services included roadway design, signing, and striping, drainage plans, Water Quality Management Plan (WQMP),
retaining wall plans, ADA improvements, erosion control, cost estimates, and project specifications.
CITY OF MONTEBELLO ON-CALL ARCHITECTURAL AND ENGINEERING
DESIGN SERVICES
MARK THOMAS
XAVIER ESPINOSA, PE
ROADWAY
EDUCATION
BS in Civil Engineering
REGISTRATION
CA C88927
Xavier has more than 9 years of experience in small and large transportation projects within Southern California. He has experience in the design and coordination of local arterial facilities, highways, at-grade rail crossings, and roadway improvements. He has led project teams and supported the design in other disciplines such as rail, utilities, and storm drain design. His project experience includes roadway realignment, highway widening, grade separations, street rehabilitation, parkway improvements, and redesign of at-grade rail crossings.
REPRESENTATIVE PROJECTS
6TH STREET VIADUCT REPLACEMENT, LOS ANGELES
Roadway engineer for the design of approximately two
miles of intersections and roadway rehabilitation around the proposed 6th Street bridge. He was responsible
for preparing roadway, striping, and drainage plans, in addition to coordinating with LABOE, LADOT, and Caltrans for plan approval.
CIVIL DESIGN ON-CALL SERVICES - COMPLETE
STREETS PROGRAM, LOS ANGELES
Project engineer responsible for the identification of
non-compliant curb ramps, damaged sidewalk, curb and
gutter requiring reconstruction, as well as the design of curb ramps to meet ADA and City standards, and other
associated street improvements. He was also responsible for leading the design team in multiple corridors and
coordinated the deliver of land survey and utility mapping for the project.
DORAN STREET GRADE SEPARATION, LOS ANGELES
Project engineer for the delivery of PS&E, the project
involved the closure of both the Doran Street and
Broadway/Brazil Street at-grade crossing at the Metrolink tracks.
SR-47/FRONT STREET/HARBOR BOULEVARD
INTERCHANGE IMPROVEMENTS, LOS ANGELES
Project engineer responsible for PS&E for the SR 47/
Front Street/Harbor Boulevard Interchange modification
to alleviate congestion and provide a direct connection to the existing West Basin Container Terminal facility for shipping terminal operators in the Port of Los Angeles.
Improvements include widening on- and off-ramps for
additional capacity and an increased acceleration/weave length. The realignment requires adding several retaining walls, the abandonment of the existing structure (Harbor Boulevard Off-Ramp Undercrossing), the removal of the
inactive portions of the Pacific Harbor Line, and minor realignment of Knoll Avenue.
ROSECRANS/MARQUARDT GRADE SEPARATION
Roadway Engineer for the alternatives analysis,
environmental clearance and PS&E for a grade separation at the BNSF tracks
LONG BEACH BOULEVARD GREEN STREET
IMPROVEMENTS, SOUTH GATE
Project engineer responsible for assisting with the
conceptual design to meet the City’s safety and multimodal goal.
TURNBULL CANYON ROAD GRADE SEPARATION,
INDUSTRY
Roadway Engineer for the delivery of PS&E, alternative
analysis, and environmental clearance of the Turnbull
Canyon Road at-grade crossing at Union Pacific tracks. Also responsible for the quality control checks during various stages of the project, to ensure successful submittal of PS&E.
OC LOOP SEGMENT D, ORANGE COUNTY
Project engineer for the Carbon Canyon Channel Bikeway.
The project includes a 12’-15’ wide bikeway, undercrossing at Golden Avenue, a 160’ long 12’x12’ box culvert at
Bastanchury Road, constructing permanent retaining
walls, drainage conveyance, lighting, fencing, landscape, irrigation, hardscape, ADA access, bicycle/ pedestrian
signals and beacons, street crossings, maintenance
road access, signage, pervious pavement and localized
stormwater best management practices (BMP’s).
CITY OF MONTEBELLO ON-CALL ARCHITECTURAL AND ENGINEERING
DESIGN SERVICES
MARK THOMAS
PAUL MARTIN, PE, TE, LCI
ACTIVE TRANSPORTATION
EDUCATION
BS in Civil Engineering
REGISTRATION
CA C65868
CA TR2315
LCI 4936
Paul has more than 23 years of experience as a transportation manager and traffic engineer. He has a strong engineering and planning background that is focused on improving public travel and safety. Paul’s expertise includes active transportation, community engagement, traffic engineering, and strategic funding programs. As the first countywide Active Transportation Coordinator for Orange County Transportation Authority (OCTA), Paul secured over $6 million in ten distinct grants to address infrastructure and non-infrastructure needs. He is also familiar with the requirements of the Caltrans Sustainable Communities grant program and has managed multiple projects funded through the program.
REPRESENTATIVE PROJECTS
SYSTEMIC SAFETY ANALYSIS REPORT, MONTEBELLO
Project manager for the preparation of a Systemic Safety Analysis Report for the City of Montebello. The report
involves analyzing crash history throughout the jurisdiction and identifying key intersections and roadway segments
for further analysis. The analysis will include identification of safety countermeasures and preliminary benefit cost ratios.
The project also involves preparing 30% designs and cost estimates for the recommended projects.
MENDEZ HISTORIC FREEDOM TRAIL, WESTMINSTER
Project manager responsible for initiating concept for
roadway reallocation to provide the first cycle-track
in the City of Westminster. Paul positioned the City to seek regional Go Human event funding illustrating
pop-up cycle-track in 2016 which later led to securing
$2.4 million in funding to implement the Mendez
Historic Freedom Trail. The trail will provide an outdoor education opportunity related to the historic Mendez
school desegregation case while also serving to manage
stormwater runoff and provide a high quality bikeway for students and community members
STANDARD AVENUE PROTECTED BIKE LANES, SANTA
ANA
Project manager responsible for PS&E for this project
design that will include separated bikeways, a protected intersection, improved pedestrian crossings of Standard Avenue, buffered bike lanes, and a bicycle boulevard in the City of Santa Ana. Collectively the project will serve bicyclists and pedestrians to better travel along Standard Avenue and cross the roadway to travel within the City.
COUNTY-WIDE ACTIVE TRANSPORTATION PLAN,
ORANGE COUNTY
Project manager responsible for securing an Active
Transportation Program 2015 grant to prepare the first
county-wide Active Transportation Plan covering both
bicycle and pedestrian topics. Branded OC Active, the
study updated the prior bicycle master plan and created data analysis to create pedestrian heat maps showing the highest need areas in all 35 jurisdictions. Creative outreach included engagement with schools for a chalk-based art
contest related to walking and biking and pop-up events at over 70 unique community events county-wide.
OC LOOP PROMOTION STRATEGY, ORANGE COUNTY
Program manager responsible for leading communications
and funding strategy for the 66-mile OC Loop to close the gap on the remaining 30-percent of unbuilt portions. Led presentations introducing project and soliciting input to over ten City Councils and coordinated a demonstration
event of a gap closure linking with the Santa Ana River in Yorba Linda. Collaborated with two cities, railroad owner, and California Public Utilities Commission to negotiate land acquisition for 4.1 mile long rails-with-trails portion. Over $20 million has been secured to close gaps along the OC Loop since 2012.
CITY OF MONTEBELLO ON-CALL ARCHITECTURAL AND ENGINEERING
DESIGN SERVICES
MARK THOMAS
CESAR MORENO | SENIOR ENVIRONMENTAL PLANNER
Mr. Moreno is a Senior Environmental Planner and Project Manager with more than 14 years of experience involving the management, preparation, review, and approval of California Environmental Quality Act (CEQA) and National Environmental Policy Act (NEPA) documents. As a dedicated public servant, he assumed diverse roles in the fields of environmental, transportation, open space, natural resource, and city planning while working on major projects in some of the most environmentally sensitive areas of Los Angeles and Ventura counties. Mr. Moreno brings a versatile and innovative approach to project delivery, tailored to the needs of his clients and counterparts in the engineering, design, planning, environmental and legal professions. His approach is informed by multiple appointments to project teams at critical junctures during project development and construction.
EDUCATION
B.A., Environmental Analysis and Design, University of California, Irvine, 2007
YEARS OF EXPERIENCE
14.5 SELECTED PROJECT EXPERIENCE
6th Street Viaduct Replacement, Los Angeles. The City of Los Angeles is replacing the 6th Street Viaduct over the Los Angeles River and U.S. Highway 101 with a new viaduct. Mr. Moreno is the project manager overseeing the Environmental Commitments Record through construction.
Alameda Street Mobility, Los Angeles. The Los Angeles County Metropolitan Transportation Authority (Metro) proposes to close the Alameda Esplanade active transportation gap between Commercial Street and Arcadia Street to improve mobility and safety of the local roadway operations and freeway, enhance accessibility, and accommodate transit connectivity and planned multi-modal access. Mr. Moreno is the project manager overseeing the preparation of the Preliminary Environmental Analysis Report (PEAR) and associated technical studies.
Glendale Boulevard-Hyperion Avenue Complex of Bridges Improvement Project, Los Angeles. Mr. Moreno worked with the City of Los Angeles as the Lead Environmental Planner for California Department of Transportation (Caltrans) District 7, tasked with the preparation and review of the NEPA/CEQA document through project approval. The project includes widening the historic GlendaleHyperion Bridge, realigning Interstate 5 northbound ramps and the Los Angeles River bike path, constructing a new bicycle/pedestrian bridge across the Los Angeles River (bicycle/pedestrian bridge completed in January 2020) and improving bicycle and pedestrian facilities throughout, improving the seismic strength of all six bridges, and upgrading the drainage system and infiltration basins.
7th Standard Road Widening Project, Shafter. The City of Shafter, in coordination with Caltrans District 6, proposes to widen 7th Standard Road from a two-lane highway to a multilane divided expressway in the City of Shafter, City of Bakersfield, and the County of Kern. Mr. Moreno is the project manager overseeing the preparation of the Preliminary Environmental Study, Initial Study/Environmental Assessment, and associated technical studies.
Northwest State Route 138 Corridor Improvement Project, Los Angeles County. Mr. Moreno worked with Metro and consultant team on the preparation of the Draft Environmental Impact Report/Environmental Impact Statement (EIR/EIS) and Community Impact Assessment and served as the Lead Environmental Planner on the preparation of the Final EIR/EIS through project approval.
The EIR/EIS evaluated corridor alternatives and related operational improvements such as improving sight distances and bringing non-standard roadway features up to current design standards. This project would widen the 36-mile east-west Northwest 138 corridor between Interstate 5 and State Route 14 in the Antelope Valley from two lanes to four and six lanes at various points.
Interstate 405 Sepulveda Pass Widening Project, Los Angeles County. Mr. Moreno worked with the Los Angeles County Metropolitan Transportation Authority (Metro) and the design-build contractor to ensure NEPA/CEQA and regulatory permit compliance, as well as implementation of large-scale mitigation efforts (e.g., wildlife crossing enhancements, revegetation of impacted drainages, and cooperative agreement for transfer of funds to plant trees within the Santa Monica Mountains), as the Lead Environmental Planner for Caltrans District 7 during construction phase. This design-build project involved constructing one 10-mile high-occupancy vehicle (HOV) lane northbound on Interstate 405 from the Interstate 10 to U.S. Highway 101. The work also included adding 10-foot shoulders, restriping all lanes to standard 12-foot widths, realigning existing on-and-off-ramps, reconstructing or modifying 23 bridge and ramp structures, building approximately 18 miles of retaining walls, and performing road improvements on the adjacent city streets.
CITY OF MONTEBELLO ON-CALL ARCHITECTURAL AND ENGINEERING
DESIGN SERVICES
MARK THOMAS
BILL ZIMMERMAN, PE, TE, PTOE
PÙʹã MĦÙ
Summary
Mr. Zimmerman has 30 plus years of experience in traffi c, highway, and transportaƟ on projects. His professional design experience includes traffi c management/project control, traffi c operaƟ on systems, communicaƟ on systems, incident and verifi caƟ on systems, traffi c studies, traffi c management plans, planning studies, highway design, arterial design, local street design, and municipal engineering.
Bill has also provided project management, project engineering, and design for several state and local highway/roadway projects that include traffi c operaƟ on and communicaƟ ons systems, interchanges, and major intersecƟ ons. He also has extensive experience in the producƟ on and preparaƟ on of PS&E projects.
Years with Firm: 24
Years with Other Firms: 10
EducaƟ on/Training:
B.S. Civil Engineering - University of
Colorado, Boulder, CO
Licenses/CerƟfi caƟ ons:
Registered Civil Engineer:
California – #48667
Registered Traffi c Engineer:
California – #2254
Project Experience
Interim City Engineer, Norwalk, CA. Interim City Engineer responsible for City Staff management, developing 8-year CIP, City representaƟ ve, Funding Manger, project management, consultant management, Design Review, traffi c engineering and support, CIP management. As Interim City Engineer, responsible for City issues, aƩ ending and presenƟ ng at City Council and Commission meeƟ ngs, aƩ ending Public Workshops, and represent City at inter-agency meeƟ ngs. In addiƟ on, responsible for seeking Federal and State funding for CIP projects from Caltrans and MTA.
Contract Traffi c Engineer, Signal Hill, CA. Contract Traffi c Engineer for the City. ResponsibiliƟ es include: City – Wide Speed Zone Studies, project studies, traffi c studies, development studies, public presentaƟ ons, plan reviews, study reviews, traffi c signal management, traffi c signal design, Consultant Management, signing and striping plan, stop sign warrants, signal warrants, lead traffi c safety commiƩ ee, funding management, resident interface, neighborhood traffi c calming programs, City Council and Planning Commission aƩ endance, and public forum presentaƟ ons.
Contract Traffi c Engineer, Seal Beach, CA. Contract Traffi c Engineer for the City. ResponsibiliƟ es include: City-wide Speed Zone Studies, project studies, traffi c studies, development studies, public presentaƟ ons, plan reviews, study reviews, traffi c signal management, traffi c signal design, Consultant Management, signing and striping plan, stop sign warrants, signal warrants, funding management, resident interface, neighborhood traffi c calming programs, City Council and Planning Commission aƩ endance, and public forum presentaƟ ons.
Traffi c Engineering Services for City of Mission Viejo, CA. Provided traffi c engineering support for a wide range of services including review of traffi c studies, traffi c signal plans, project reports, and environmental reports; performing traffi c studies, assessing impact of proposed projects, assessing and reviewing community safety concerns, preparaƟ on of Agenda Reports for the Traffi c and TransportaƟ on Commission and City Council, responding to ciƟ zen inquiries, and supporƟ ng the City’s transportaƟ on Engineer. Represented the City at interagency coordinaƟ on meetings.
CITY OF MONTEBELLO
ON-CALL ARCHITECTURAL AND ENGINEERING DESIGN SERVICES
P R OJ E C T A P P R O A C H &
UNDERSTANDING
CITY OF MONTEBELLO ON-CALL ARCHITECTURAL AND ENGINEERING
DESIGN SERVICES
MARK THOMAS
P R OJ EC T A P P R OAC H A N D
UNDERSTANDING
PROJECT UNDERSTANDING
The City of Montebello is seeking consultant architectural and engineering design services on an on-call basis for projects throughout the City. These projects consist of work related to street, sidewalks, sewer, storm drain, water, landscaping and irrigation, street lighting, traffic signals and city-owned facilities such as parks, parking lots and buildings. Mark Thomas understands that through the on-call contract, the services may include project management, conceptual and final design, third party coordination and permitting, support through the bid and construction phases as well as plan checking services.
Mark Thomas understands that the City has limited staff to deliver the volume of projects in your CIP and is reliant upon these on-call services to do so. We know the key to successfully completing on-call services is to have the depth of staff and to work as an extension of the City’s engineering staff. Mark Thomas stands ready to provide the staff and services needed to support the City. We bring the City a staff of over 300 and have provided a well-rounded team of subconsultants that provides additional depth of resources and expertise to deliver your task orders. With the resources available to Mark Thomas, multiple task orders can be performed concurrently, and with the strength of the task order managers, these tasks will be delivered on time and on budget. We will help you deliver your CIP and meet your commitment to your community.
We will also support the City with staff experienced in reviewing third-party designs from developers or outside agencies that are implementing a project in the City. These projects could include the Montebello Boulevard Grade Separation (San Gabriel Valley Council of Governments), Eastside Light Rail (LA Metro) and the Whittier Narrows Dam (United States Army Corps of Engineers). With our experience, we’ll ensure that the City’s interests and standards are being upheld.
The following work plan represents our general project approach. Mark Thomas will develop a specific work plan for each task order for which we are selected. The key to our approach is to provide the right team for each task. We use a five-step process shown in the figure below to ensure timely and effective response to our client’s requests for on-call services.
STEP 1
Project is identified
requiring the Mark
Thomas team.
STEP 2
Mark Thomas’ project
manager meets
with the City staff to
discuss the project.
STEP 3
Mark Thomas
develops and submits
the scope of work and
fee for the project.
STEP 4
Mark Thomas meets
with the City to review
and finalize the
budget and schedule
requirements.
STEP 5
Upon approval
and receipt of the
Engagement Letter,
our project manager
will mobilize the team
and begin work.
TASK ORDER APPROACH
Our approach to on-call contracts is grounded in our understanding that successful projects, including at the task order level, are a direct result of the following elements:
» A commitment of our most qualified engineering,
design, support staff, and additional resources via
teaming partners as is necessary to deliver every project on time and within budget
» Early identification and resolution of issues
» Acting as an extension of City staff, including always looking out for the City’s best interest
» Being responsive and collaborative in order to meet the needs of the City and the public
» Monitoring design activities and delivery schedules
through a committed Quality Assurance/Quality Control
(QA/QC) process
» Providing direction on the most beneficial and costeffective task order solutions » Open communication and coordination with our clients
Mark Thomas has developed a general approach to a PS&E task order that is described on the following pages. Ultimately, each task order is completed with a tailored approach according to the City’s specific needs, budget, and schedule. For projects with State and/or Federal funding, Mark Thomas will assist the City in the administration and processing of the necessary documents with Caltrans Local Assistance, as discussed further in this Section.
CITY OF MONTEBELLO ON-CALL ARCHITECTURAL AND ENGINEERING
DESIGN SERVICES
MARK THOMAS
TASK ORDER DELIVERY
Review and Understand the Project
Mark Thomas will gather readily accessible information on the project and will conduct a project site visit during our scope development process where applicable. This will confirm our project understanding and help us answer key technical questions, even before task order notice to proceed (NTP) is received. We will obtain encroachment permits for full access to the project site as one of the first orders of work, along with site specific information, including as-builts and facility maps from pertinent agencies/stakeholders/utility owners, survey data, geotechnical information, and subsurface investigations.
When conflicts such as utilities or potential property impacts are identified during the concept design development, we secure deeds and relevant title-related records to understand liability/risk/costs associated with the impacts. Early pre-concept design identification of constraints provides us with flexibility, allowing for more time to mitigate risks and incorporate cost-effective solutions in the project.
Concept Design Development
If a conceptual design has not been completed at the start of the task order, Mark Thomas will include preliminary design tasks in the scope of work for the project. We will analyze alternatives to determine their relative impacts and prepare preliminary construction cost estimates to assist the City in evaluating each alternative. For each alternative, if needed, we will identify the right of way impacts and address the required environmental clearance and documentation for the project.
We have provided conceptual designs for numerous improvements to enhance mobility, safety, and traffic operations. We recently completed a conceptual design for the Peters Canyon Bikeway Extension and Olive Height Sidewalk Gap Closure for the County of Orange. These designs analyzed potential improvements and developed cost estimates to determine the selected alternative to advance to final design.
Final Design
Generally, when a project reaches the final design phase, all conceptual/preliminary design tasks have already been completed and environmental clearance obtained. At this stage, the Mark Thomas team will verify that there are no elements of the project that require modification due to any updates in design standards or similar requirements that may have occurred between the conceptual design phase and the start of the final design. If there are elements that require modification, we will promptly notify the City to ensure that a collaborative approach can be taken to resolving updates.
During the final PS&E phase, our team will prepare specifications and special provisions based on the local jurisdiction and/or the City’s standard drawings, AASHTO “Greenbook” or Caltrans standard specifications, and other related agency standards if required. A construction cost estimate will be produced for the City, identifying all bid items. Additionally, if a project requires the acquisition of any necessary right of way and or easement, our team can produce legal descriptions, appraisal maps, and right of way maps necessary for any fee takes or temporary construction easements. If the task order was State or Federally funded, we would assist in the ROW certification and RFA packages to receive Caltrans Local Assistance approvals as well as the CTC funding obligation Mark Thomas has provided final design services for a wide variety of improvements including roadway rehabilitations and widenings, ADA curb ramps, sidewalks, bike lanes, intersection modifications, and storm drain facilities. We are currently finalizing the project designs for widening and rehabilitation improvements along Firestone Boulevard in the City of Norwalk and the complete street improvements on Long Beach Boulevard in the City of South Gate.
Construction Phase
At the completion of the final design phase, Mark Thomas will assist the City through the bid and construction phases of the project. We will support the City construction management and inspection crews, providing the following:
» Coordinate bid advertisement
» Provide support during the bid phase
» Prepare bid summary report
» Attend pre-construction meeting
» Conduct field reviews
» Perform shop drawing and submittal review
» Respond to Requests for Information
» Prepare as-built record drawings
If desired, Mark Thomas can provide construction management and administration services, including:
» Resident Engineering services
» Perform construction administration
» Conduct construction inspection
» Provide construction surveys and grade sheet reviews