Cities Index.
118_09122024%20Agenda%20Packet%20reduced%20file%20size%20page%20numbers

Newark City Council
September 12, 2024

Document
118_09122024%20Agenda%20Packet%20reduced%20file%20size%20page%20numbers
Meeting
September 12, 2024
Body
Newark City Council
Pages
19
Original file
113.3 MB
Text extracted from the city's file for reading and search. Open the original on public.destinyhosted.com. That file is the official record.

Packet Page No. 1395
Q1 Do you live in the Tri-City area?
Q2 What city do you work in?
Yes, I am a Fremont resident. Yes, I am a Newark resident. Yes, I am a Union City resident.

No, but I work in the Tri-City area. No, I don't live or work in the Tri-City area.

Question options
10 20
30 26
7 5
1 I work in Newark. I work in Fremont. I work in Union City.

Question options
1 2
1 Optional question (39 response(s), 0 skipped)
Question type: Checkbox Question
Optional question (1 response(s), 38 skipped)
Question type: Checkbox Question
Tri-City Multi-jurisdictional Local Hazard Mitigation Plan - Public Outreach Survey : Survey Report for 14 August 2023 to 25 January 2024

Page 2 of 19 ends

Packet Page No. 1396
Q3 Of the following hazards, please select those that you think pose the greatest risk to the Tri-City area. Select up to thr...

Climate Change Coastal Flooding and Sea Level Rise Dam Failure Drought and Water Shortages Earthquake Extreme Cold and Freeze Extreme Heat Flood High Winds Levee Failure Wildfire Tsunami
Question options
2 4
6 8
10 12
14 16
18 20
22 24
26 18
11 2
20 24
1 12
2 4
1 19
Optional question (39 response(s), 0 skipped)
Question type: Checkbox Question
Tri-City Multi-jurisdictional Local Hazard Mitigation Plan - Public Outreach Survey : Survey Report for 14 August 2023 to 25 January 2024

Page 3 of 19 ends

Packet Page No. 1397
Q4 Have you experienced a natural disaster (wildfire, high winds, flood, earthquake, etc.) in the Tri-City Area?
15 (38.5%)
15 (38.5%)
24 (61.5%)
24 (61.5%)
Yes No
Question options
Optional question (39 response(s), 0 skipped)
Question type: Radio Button Question
Tri-City Multi-jurisdictional Local Hazard Mitigation Plan - Public Outreach Survey : Survey Report for 14 August 2023 to 25 January 2024

Page 4 of 19 ends

Packet Page No. 1398
Anonymous
8/18/2023 05:40 PM
Heavy rains caused me flows g from the hills de smashing my fence and sending me into my back yard
Anonymous
8/18/2023 11:40 PM
loma prieta
Anonymous
8/19/2023 12:40 PM
Wildfire near our cities
Anonymous
8/20/2023 12:53 PM
Our house doesn't have air conditioning so the heatwave last year was brutal
Anonymous
8/20/2023 08:50 PM
Earthquake. Maybe several years ago. No significant/mentionable impact.

Anonymous
8/22/2023 06:26 PM
Back in 1970’s Niles hill fires
Anonymous
8/25/2023 04:23 PM
The Loma Prieta Earthquake. Helped elderly people get out of the pool at the gym.

Anonymous
8/26/2023 10:07 AM
The Loma Prieta Quake
Anonymous
9/02/2023 09:50 AM
1989 Loma Prieta Earthquake. Huge complex fire in the Alameda Creek Watershed a few years back.

Anonymous
9/21/2023 10:04 AM
Earthquakes past 20 years. Increased heat past couple years Anonymous
12/04/2023 11:43 AM
Severe flooding in Newark, approximately dec 2022
12/14/2023 07:18 PM
Loma Preita earthquake
Q5 Please describe the disaster, including approximate date and impacts.

Tri-City Multi-jurisdictional Local Hazard Mitigation Plan - Public Outreach Survey : Survey Report for 14 August 2023 to 25 January 2024

Page 5 of 19 ends

Packet Page No. 1399
Anonymous
1/22/2024 08:01 PM
Winter 2023 Flooding in Newark Sanctuary Villiage, damages to the foundation.

Anonymous
8/18/2023 05:40 PM
Eat Bag Parks could have placed plastic over the flows
Anonymous
8/18/2023 11:40 PM
provisions in car
Anonymous
8/19/2023 12:40 PM
Better communication of resources
Anonymous
8/20/2023 12:53 PM
Nothing, we're broke.

Anonymous
8/20/2023 08:50 PM
No impact.

Anonymous
8/25/2023 04:23 PM
None.

Anonymous
8/26/2023 10:07 AM
City of Fremont should have developed own earthquake retrofit program & include all homes with slab foundation - these have been ignored and yet many homes are built that way.

Anonymous
9/02/2023 09:50 AM

1. Water and sewer pipes need to be seismically upgraded. 2. Better management of our watershed to reduce ground fuel and create fire barriers.

Anonymous
9/21/2023 10:04 AM
Heat - Plant more trees and reduce heat island effect Earthquake - my be do an outreach/email for how will the mass communication be for the shelter etc. and educate residents to prepare kits etc.

Optional question (13 response(s), 26 skipped)
Question type: Essay Question
Q6 What steps could have been taken before the disaster occurred to prevent or reduce the impacts?
Tri-City Multi-jurisdictional Local Hazard Mitigation Plan - Public Outreach Survey : Survey Report for 14 August 2023 to 25 January 2024

Page 6 of 19 ends

Packet Page No. 1400
Anonymous
12/04/2023 11:43 AM
Better drainage systems. We live so close to the wetlands, all of the water should flow easily to the bay.

Anonymous
1/22/2024 08:01 PM
Don’t allow homes to be build in the flood zone. Building ontop of wetlands causes man made disasters and destroys the natural protection of storm surges
Optional question (11 response(s), 28 skipped)
Question type: Essay Question
Tri-City Multi-jurisdictional Local Hazard Mitigation Plan - Public Outreach Survey : Survey Report for 14 August 2023 to 25 January 2024

Page 7 of 19 ends

Packet Page No. 1401
Q7 Would you like to describe another natural disaster you experienced? 15 (100.0%)
15 (100.0%)
0 (0.0%)
0 (0.0%)
No Yes
Question options
Optional question (15 response(s), 24 skipped)
Question type: Radio Button Question
Tri-City Multi-jurisdictional Local Hazard Mitigation Plan - Public Outreach Survey : Survey Report for 14 August 2023 to 25 January 2024

Page 8 of 19 ends

Packet Page No. 1402
Q13 Is your Tri-City area home or business located in a FEMA designated floodplain? 3 (7.7%)
3 (7.7%)
16 (41.0%)
16 (41.0%)
20 (51.3%)
20 (51.3%)
Yes No I don't know
Question options
Optional question (39 response(s), 0 skipped)
Question type: Radio Button Question
Tri-City Multi-jurisdictional Local Hazard Mitigation Plan - Public Outreach Survey : Survey Report for 14 August 2023 to 25 January 2024

Page 9 of 19 ends

Packet Page No. 1403
Q14 Do you have flood insurance?
1 (2.6%)
1 (2.6%)
31 (79.5%)
31 (79.5%)
7 (17.9%)
7 (17.9%)
Yes No I don't know
Question options
Optional question (39 response(s), 0 skipped)
Question type: Radio Button Question
Tri-City Multi-jurisdictional Local Hazard Mitigation Plan - Public Outreach Survey : Survey Report for 14 August 2023 to 25 January 2024

Page 10 of 19 ends

Packet Page No. 1404
Q15 Do you have earthquake insurance?
12 (30.8%)
12 (30.8%)
21 (53.8%)
21 (53.8%)
6 (15.4%)
6 (15.4%)
Yes No I don't know
Question options
Optional question (39 response(s), 0 skipped)
Question type: Radio Button Question
Tri-City Multi-jurisdictional Local Hazard Mitigation Plan - Public Outreach Survey : Survey Report for 14 August 2023 to 25 January 2024

Page 11 of 19 ends

Packet Page No. 1405
Q16 How prepared are you for a natural disaster?
3 (7.7%)
3 (7.7%)
24 (61.5%)
24 (61.5%)
12 (30.8%)
12 (30.8%)
0 (0.0%)
0 (0.0%)
Very Prepared Somewhat Prepared Unprepared I don't know Question options
Optional question (39 response(s), 0 skipped)
Question type: Radio Button Question
Tri-City Multi-jurisdictional Local Hazard Mitigation Plan - Public Outreach Survey : Survey Report for 14 August 2023 to 25 January 2024

Page 12 of 19 ends

Packet Page No. 1406
Q17 Have you signed up to receive emergency notifications via AC Alert? 20 (51.3%)
20 (51.3%)
8 (20.5%)
8 (20.5%)
11 (28.2%)
11 (28.2%)
Yes No I don't know
Question options
Optional question (39 response(s), 0 skipped)
Question type: Radio Button Question
Tri-City Multi-jurisdictional Local Hazard Mitigation Plan - Public Outreach Survey : Survey Report for 14 August 2023 to 25 January 2024

Page 13 of 19 ends

Packet Page No. 1407
Q18 Your City or utility district may wish to share information about emergency preparedness and how to reduce the risk natural disasters pose to your household and neighborhood. Which communication methods do you prefer? Select up to two.

Newspaper (print) Television Radio Direct mailings e-Newsletter (email) Website Social Media Public Meetings
Question options
2 4
6 8
10 12
14 16
18 20
22 24
26 28
3 4
5 16
25 7
8 2
Optional question (39 response(s), 0 skipped)
Question type: Checkbox Question
Tri-City Multi-jurisdictional Local Hazard Mitigation Plan - Public Outreach Survey : Survey Report for 14 August 2023 to 25 January 2024

Page 14 of 19 ends

Packet Page No. 1408
Anonymous
8/18/2023 04:37 PM
Harden 1st responder sites and hospitals. Enhance PG&E response with city / county staff.

Anonymous
8/18/2023 04:49 PM
Provide easy to understand but specific information about risks for each local neighborhood.

Anonymous
8/18/2023 05:40 PM
Maintain a high level of preventive maintenence
Anonymous
8/18/2023 06:16 PM
Provide community training so people learn how to manage natural disasters on their own until help arrives. Training should provide info on how to cooperate as a neighborhood in addition to what to do to prepare individually/as a family.

Anonymous
8/18/2023 09:33 PM
strengthen utility lines, water, sewer, gas, from failure during earthquake. Encourage preparation like adding automatic gas shutoff on houses.

Anonymous
8/18/2023 11:40 PM
timely alerts
Anonymous
8/19/2023 12:40 PM
Plant more trees, prevent fires by monitoring
Anonymous
8/20/2023 10:09 AM
To have and stress the importance and resources available.

Anonymous
8/20/2023 12:53 PM
Offer grants for people to make their homes and communities climateresilient, plant more trees to naturally cool the area, move development and utilities further inland and do ecological restoration along the coast, replace municipal lawns with community gardens, etc.

Anonymous
8/22/2023 09:46 AM
Move all power cables underground. Increase ground cover plants and trees. Remove dry brush and manage wile growth of plants by the roadsides. Make the public pathways clean and prevent risk of Q19 What would you like your City or utility district to do to reduce the impact of future natural disasters?
Tri-City Multi-jurisdictional Local Hazard Mitigation Plan - Public Outreach Survey : Survey Report for 14 August 2023 to 25 January 2024

Page 15 of 19 ends

Packet Page No. 1409
damage due to fire spreading or debris flow
Anonymous
8/22/2023 06:26 PM
Cut the trees and bushes in the old Alameda creek in front of my home.

Anonymous
8/22/2023 09:16 PM
Be proactive about potential disasters to avoid worst case scenarios.

Anonymous
8/25/2023 04:23 PM
Take a more active role to reduce the fire hazards from overgrown dried weeds throughout the City and also from homeless
encampments.

Anonymous
8/26/2023 10:07 AM
Include retrofit programs with list of approved contractors to do the work now—not after next quake. Seniors citizens, especially need help to get this information as disasters create scammers who pass themselves off as experienced professionals. I believe Hayward has retrofit plans but no plans address slab foundations. What is the number of homes in Fremont with slab foundations in Fremont? To my knowledge, Fremont hasn’t created any plans and or steps for Do It Yourself guides to sell to residents for retrofit for nominal fee. It would be helpful to have more easily found maps showing natural conditions of creeks, springs and marshes, in addition to major gas lines, major electric power lines, earthquake fault lines, areas in potential fire areas and flooding areas, as well as underground springs water ( ie Weibel & Warm Springs). Fremont website should make it easy to find this info
Anonymous
8/26/2023 11:41 AM
Plan ahead & invest the funds necessary.

Anonymous
9/01/2023 06:19 PM
Help lower earthquake insurance costs. Underground all utility lines.

Anonymous
9/02/2023 09:50 AM
Seismically upgrade all infrastructure in the Tri-Cities area. Create an earthquake alert system. Have a detailed earthquake response plan.

Stock emergency supplies of critical equipment for the inevitable big one. Keep educating the community on earthquake preparedness with checklist handouts.

Anonymous
9/10/2023 02:42 PM
Stop building nearer and nearer to the Bay
Tri-City Multi-jurisdictional Local Hazard Mitigation Plan - Public Outreach Survey : Survey Report for 14 August 2023 to 25 January 2024

Page 16 of 19 ends

Packet Page No. 1410
Anonymous
9/19/2023 11:15 AM
make sure infrastructure is prepared for earthquake.

Anonymous
10/04/2023 10:02 AM
plan ahead and prioritize climate resilience. get more people aware of risks and what to do in an emergency.

Anonymous
10/20/2023 05:01 PM
More outreach on emergency preparedness and immediate hazards and risks in city.

Anonymous
10/25/2023 09:52 AM
Stop using fossil fuels--give every house solar. Plant more native trees.

Anonymous
11/15/2023 10:07 PM
Regular clean up of debris around city
Anonymous
11/23/2023 09:22 AM
Ensure that the city is first safe from our own failures - water and electric grid, roads, schools, sanitation, levees, rampant housing (and bending backwards to help developers). This is something you can actually do.

Anonymous
1/03/2024 06:15 PM
Working with the natural environment long term to mitigate flooding areas and prevent fires more
Anonymous
1/22/2024 08:01 PM
don't put more people in harms way by building new housing atop restorable wetlands in a sea level rise inundation zone! Anonymous
8/18/2023 04:49 PM
Please don't allow this to become another high-level check the box planning effort filled with generalities.

Anonymous
8/18/2023 06:16 PM
Hopefully the models being used to predict potential problems are forward looking (e.g. not using rainfall models from previous years data and are instead taking into account climate change prediction models).

Optional question (26 response(s), 13 skipped)
Question type: Essay Question
Q20 Is there any thing else you would like to add?
Tri-City Multi-jurisdictional Local Hazard Mitigation Plan - Public Outreach Survey : Survey Report for 14 August 2023 to 25 January 2024

Page 17 of 19 ends

Packet Page No. 1411
Anonymous
8/18/2023 09:33 PM
Try to encourage preparation and get a bicycle or scooter because they will work if there is no gasoline and electricity or roads are messed up.

Anonymous
8/18/2023 11:40 PM
there should be multiple places to go in case of disaster. not good if all go to the same location.

Anonymous
8/19/2023 12:40 PM
Awareness and education of climate change through social media Anonymous
8/22/2023 06:26 PM
We continually experience fires in the field and creek from the homeless that live in the creek and this year Union city had a major fire due to having legal fireworks that could have spread into the field.

Anonymous
8/25/2023 04:23 PM
No thank you.

Anonymous
8/26/2023 10:07 AM
Although Fremont staff had to adapt to the Pandemic and still provide some services onsite, residents got info they needed with return phone calls, emails etc. Now there seems to be one single phone number with recorded phone tree —expecting people to know the name of a staff person or even which department on their first call? Could this be more user friendly with a “real person” available to greet and assist those with a general phone number for the appropriate department?
Anonymous
9/02/2023 09:50 AM
Yes, stop all housing and commercial developments by our bay lands.

Anonymous
9/09/2023 11:16 AM
I would want the city to text me like amber alerts.

Anonymous
9/19/2023 11:15 AM
Natural gas lines should have automatic shut off values in case of a major earthquake.

Anonymous
10/04/2023 10:02 AM
shallow groundwater is a big threat to newark that should be studied as part of this effort.

Anonymous Pl use your brain and not a project report to improve basic facilities Tri-City Multi-jurisdictional Local Hazard Mitigation Plan - Public Outreach Survey : Survey Report for 14 August 2023 to 25 January 2024

Page 18 of 19 ends

Packet Page No. 1412
11/23/2023 09:22 AM and utilities. For example, roads, sanitation, schools continue to deteriorate esp as population rises.

Anonymous
1/22/2024 08:01 PM
Please do not allow developers to build the Mowry housing at the pick and pull site. The pick and pull location should not have been in that wetland location in the first place. We need to be more practical about placing homes in safer locations. Don’t destroy our natural parks area and wetlands. They are priceless and sensitive areas that require protection.

Optional question (14 response(s), 25 skipped)
Question type: Essay Question
Tri-City Multi-jurisdictional Local Hazard Mitigation Plan - Public Outreach Survey : Survey Report for 14 August 2023 to 25 January 2024

Page 19 of 19 ends

Packet Page No. 1413
Tri-City H-1
Local Hazard Mitigation Plan Update
March 2024
Appendix H Hazus Reports
Multiple Hazus Scenario reports were completed for this LHMP Update. These include the following:

Tri-City Planning Area (including ACWD and USD)
➢ Calaveras 7.43 with 10 mph wind
➢ Calaveras 7.43 with 50 mph wind
➢ Hayward + Rodgers Creek 7.57 with 10 mph wind
➢ Hayward + Rodgers Creek 7.57 with 50 mph wind
➢ Hayward (Haywired Scenario) 7.0 with 10 mph wind
➢ Hayward (Haywired Scenario) 7.0 with 50 mph wind
➢ San Andreas 7.9 with 10 mph wind
➢ San Andreas 7.9 with 50 mph wind
City of Fremont
➢ Calaveras 7.43 with 10 mph wind
➢ Calaveras 7.43 with 50 mph wind
➢ Hayward + Rodgers Creek 7.57 with 10 mph wind
➢ Hayward + Rodgers Creek 7.57 with 50 mph wind
➢ Hayward (Haywired Scenario) 7.0 with 10 mph wind
➢ Hayward (Haywired Scenario) 7.0 with 50 mph wind
➢ San Andreas 7.9 with 10 mph wind
➢ San Andreas 7.9 with 50 mph wind
City of Newark
➢ Calaveras 7.43 with 10 mph wind
➢ Calaveras 7.43 with 50 mph wind
➢ Hayward + Rodgers Creek 7.57 with 10 mph wind
➢ Hayward + Rodgers Creek 7.57 with 50 mph wind
➢ Hayward (Haywired Scenario) 7.0 with 10 mph wind
➢ Hayward (Haywired Scenario) .0 with 50 mph wind
➢ San Andreas 7.9 with 10 mph wind
➢ San Andreas 7.9 with 50 mph wind
City of Union City
➢ Calaveras 7.43 with 10 mph wind
➢ Calaveras 7.43 with 50 mph wind
➢ Hayward + Rodgers Creek 7.57 with 10 mph wind
➢ Hayward + Rodgers Creek 7.57 with 50 mph wind
➢ Hayward (Haywired Scenario) 7.0 with 10 mph wind
➢ Hayward (Haywired Scenario) 7.0 with 50 mph wind
➢ San Andreas 7.9 with 10 mph wind
➢ San Andreas 7.9 with 50 mph wind
Packet Page No. 1414
2024 Tri-City Local Hazard
Mitigation Plan Update
September 12, 2024
City Council Meeting
Packet Page No. 1415
• Local Hazard Mitigation Plan (LHMP) Background
• Resource Organization
• Hazards and Risks Assessment
• Plan Development
• Plan Monitoring and Implementation
• Recommendation
Overview
2 Packet Page No. 1416
2024 Tri-City LHMP Background
Contractor and Planning Team worked
to meet FEMA/CalOES requirements
Tri-City partnership with
FEMA grant funding
3 Packet Page No. 1417
2024 Tri-City LHMP Background
Federal government in 2002
updated the Stafford Act to
include Title 44/Chapter 1 Part
201 (44 CFR Part 201).
4 Packet Page No. 1418
• Spring of 2021 the City Office of Emergency Services
began process to update 2017 LHMP
• September 2022 the City of Fremont was awarded a
FEMA grant to hire a contractor
• January 2023 the Project team selected FosterMorrison as our contractor Organize Resources
5 Packet Page No. 1419
• April 2023 established Project team and timeline
• April 2023 Project team identified Planning team
members
• April 2023 – January 2024 Community engagement
Organize Resources
6 Packet Page No. 1420
Assess Hazards and Risks

PRIORITY HAZARDS LIKELIHOOD OF FUTURE OCCURENCES
Climate Change Highly Likely
Coastal Flooding and Sea Level Rise Highly Likely
Dam Failure Unlikely
Drought and Water Shortage Likely
Earthquake Highly Likely
Floods: 1%/0.2% annual chance Occasional
Floods: Localized/Stormwater Flooding Highly Likely
Landslide Likely
Levee Failure Unlikely
Severe Weather: Extreme Cold and Freeze Likely
Severe Weather: Extreme Heat Highly Likely
Severe Weather: Heavy Rains, Storms and High Winds Highly Likely Tsunami Unlikely
Wildfire Highly Likely
7 Packet Page No. 1421
• September 2023 Planning team set goals
• October 2023 Planning team reviewed 2017 Action Items • October 2023 Planning team received draft plan
Develop Mitigation Plan
8 Packet Page No. 1422
• Public Education and Awareness
• Retrofit existing facilities and address back-up power • Develop plans addressing sea level rise, storm drains, and urban forest
• Enhance GIS data systems and mapping
• Complete Central Avenue railroad overpass
Develop Mitigation Plan – Action Item Highlights
9 Packet Page No. 1423
• March 2024: Submitted 2024 Tri-City LHMP Update
to Cal OES and FEMA
• July 2024: Received Cal OES and FEMA conditional
approval pending jurisdiction adoption
• August 2024: Newark Disaster Council approved
recommending City Council adopt the 2024 Tri-City
LHMP Update
Implement and Monitor
10 Packet Page No. 1424
• September 2024: City Council adoption of the 2024 Tri-City LHMP Update for consideration
• Next Steps:
• Following City Council adoption, the 2024 Tri-City LHMP Update may then be formally approved by Cal OES and
FEMA.
• Newark Disaster Council will review status of the 2024 TriCity LHMP Update action items yearly (at minimum).

Implement and Monitor
11 Packet Page No. 1425
• Staff recommends that City Council adopt a resolution approving the 2024 Tri-City Local Hazard Mitigation
Plan Update
Recommendation
12 Packet Page No. 1426
Item  F. 2.

DATE 09/12/2024
TO Honorable Mayor and City Council Members
FROM Roya Gonzalez, Senior Management Analyst
SUBJECT    Receive a presentation of the draft Facilities Master Plan and provide feedback
SUMMARY AND RECOMMENDATION
Staff recommends that the City Council receive a presentation on the draft Facilities Master Plan (Plan) and provide feedback to be incorporated into the final Plan.

BACKGROUND
The City owns and maintains 24 structures, each managed within the constraints of allocated resources and specific preventative maintenance plans. Recognizing the need for a comprehensive approach to address future growth, facility maintenance, and community needs, the City Council approved an agreement in November 2022 with Group 4 Architects to develop the City's first Facilities Master Plan.

Group 4 Architects, alongside their team of consultants, conducted an extensive process to develop the Plan, which included four main tasks:

Task 1: Existing Conditions Evaluations: to assess the physical condition and maintenance needs of each City building, a Facility Condition Assessment (FCA) was completed for each of the City buildings. The FCA included the building site, exterior envelope, structure, interior elements, visual ADA compliance and mechanical, electrical, and plumbing (MEP) systems.

Task 2: Future Needs Assessment: to gain a thorough understanding of the City’s operational needs, the consultant toured each facility to assess the requirements of both staff and the community. During these tours, several future projects were identified to enhance operational efficiency and accommodate expected growth in staff and services. This phase also marked the first part of a two-stage community engagement process aimed at identifying the community's facility space needs. The community expressed a strong interest in arts and community spaces, highlighting the need for facility spaces like an arts/craft studio and a performance theater. Additionally, the consultant reviewed industry standards, trends, and best practices in community facilities to tailor recommendations that address Newark’s specific requirements.

Task 3: Facility Options: to address the arts and community space needs identified Packet Page No. 1427
Task 3: Facility Options: to address the arts and community space needs identified through community engagement, the consultant proposed a Cultural Arts Community Center with three size options at two potential locations. The proposed sizes are:

Option A: 18,000 square feet
Option B: 25,000 square feet
Option C: 32,000 square feet
Each size option incorporates the spaces prioritized by the community. These options were evaluated at two possible sites: Newark Community Park and Civic Center Park.

In phase two of the community engagement process, these options, along with a set of evaluation criteria, were presented to the public. By the end of this phase, it was evident that the Newark Community Park location and size Option C were preferred.

Task 4: Implementation Plan: The implementation plan is separated into four categories:

Preventive Maintenance: The preventative maintenance is estimated at $73 million over the next 20 years, with costs varying annually. This estimate does not cover preventive maintenance for facilities recommended for replacement (Newark Community Center, Fire Stations 27 and 29) or vacant buildings.

Renovations/Capitol Projects: Several future projects were identified during Task 2 (Future Needs Assessment) to improve operational efficiency and accommodate anticipated growth in staff and services.

New or Replacement Facilities: The proposed new Cultural Arts Community Center is recommended to be built at the existing Community Center site, replacing the current facility. Due to several operational deficiencies, extensive maintenance needs, and overall poor building conditions, the consultant also recommends replacing Fire Station No. 27 (at the intersection of Cherry Street and Mowry Avenue) and Fire Station No. 29 (on Ruschin Drive at Newark Boulevard).

Sell/Repurpose/Demolish: The City owns three vacant buildings - Watkins Hall, the previous library building, and the previous fire station on Thornton Avenue. In addition to their condition and the required upgrades to meet code requirements, no specific uses were identified for these buildings during Task 2 (Future Needs Assessment).

At the City Council meeting on February 22, 2024, the consultant provided a comprehensive summary of the community engagement process and presented key findings. By sharing these findings before presenting the draft plan, the City Council had the opportunity to take the City’s facility needs into account when assessing whether to place a measure on the ballot to update the Transient Occupancy Tax rate (“TOT” and commonly known as the “Hotel Tax”).

DISCUSSION/ANALYSIS
The Facilities Master Plan outlines a comprehensive strategy for managing and enhancing the City’s facilities over the next 20 years. It is structured around four key categories: Preventive Maintenance, Renovations/CIP, New or Replacement Facilities, and Sell/Repurpose/Demolish.

Preventive Maintenance: Historically, the City has managed its buildings individually. However, the data from the Facility Condition Assessments will Packet Page No. 1428
enable staff to develop a comprehensive, long-term preventive maintenance plan.

This plan will help staff allocate funds effectively from the maintenance reserve and budget appropriately. By maintaining the City's assets properly, the Plan aims to extend the lifespan of the buildings and ensure their continued functionality.

Renovations/Capitol Projects: No projects are recommended for immediate completion. All recommendations will be submitted to the Council for review as part of the Capital Improvement Program process. The projects are categorized into three time frames: near term (3-5 years), mid-term (5-10 years), and long term (11-20 years). This categorization will serve as a guide for scheduling and prioritizing these projects for future consideration. These recommendations will address future growth, as well as identified community needs.

New or Replacement Facilities: The estimated cost for replacing Fire Stations No. 27 and 29 ranges from $15 million to $19 million each, totaling between $30 million and $38 million. The proposed new Cultural Arts Community Center is estimated to cost between $32 million and $56 million, depending on its size. All three facilities are recommended for the immediate/short-term (1-3 years) replacement.

A comprehensive funding strategy will need to be developed to support these projects.

Sell/Repurpose/Demolish: These three buildings will need further analysis to determine their future. During the two-part community engagement process, the community did not identify any specific uses for these buildings. Therefore, a thorough analysis of each site will be necessary to make informed recommendations to City Council.

Successful implementation of this Plan will necessitate thorough consideration of financial, logistical, and community needs. A general overview of the facility recommendations for the first five years is shown below.

2024-2029 City Facility Recommendations Summary
Facility Maintain Renovations/CIP Replace Selll/Repurpose/Demo Ash Street
Park
Buildings
X
Birch
Grove
Restrooms
X
Boathouse
at
Lakeshore
Park
X
Community
Center
Annex
X
Community
Center
Building
X
Packet Page No. 1429
Community
Center
Restroom
Building
X
Fire
Station 27
X
Fire
Station 28
XX
Fire
Station 29
X
Old Fire
Station
X
Old LibraryX
Clark W.

Redeker
Senior
Center
X
Second
Chance
Shelter
X
Service
Center
XX
George M.

Silliman
Community
Activity
Center
X
Mel Nunes
Sportsfield
Restroom
Building
X
Watkins
Hall
X
David W.

Smith City
Hall
X
Alan L.

Nagy
Library
X
Police
Department
X
Packet Page No. 1430
At the City Council meeting, the consultant will present an overview of the Plan's development process and review its recommendations. Following the presentation, the consultant will seek feedback from the public and City Council to refine and advance the Plan.  Staff anticipates bringing the final Plan to the Council for approval before the end of the year.

FISCAL IMPACT
There is no fiscal impact associated with this item.

REVIEW AND APPROVAL
Prepared by - Roya Gonzalez, Senior Management Analyst
Reviewed by - Lenka Hovorka, Assistant City Manager
Reviewed by - Krysten Lee, Finance Director
Reviewed by - Kristopher J. Kokotaylo, City Attorney
Approved by - David J. Benoun, City Manager
Attachments
Draft Facilities Master Plan
FMP Presentation
Packet Page No. 1431
City of Newark
Facilities Master Plan
PMT REVIEW DRAFT REPORT | 08 JULY 2024
Packet Page No. 1432
Packet Page No. 1433
TABLE OF CONTENTS i
PMT REV I EW DRAFT 07/08/2024

CITY OF NEWARK FACILITIES MASTER PLAN

CONTENTS

1. Introduction ..................................................................................................................... 3 Executive Summary .............................................................................................................. 4 Project Goals and Purpose .................................................................................................. 6 Plan Summary ....................................................................................................................... 6 Work Plan and Participation Plan........................................................................................ 7 Analysis of Existing Operations........................................................................................... 8 Facility Condition Assessments........................................................................................... 8 Facility Condition Assessments Summary Table................................................................ 9 Project Participation ........................................................................................................... 14

2. Community, Recreation, and Aquatic Facilities............................................................. 17 Newark Community Center............................................................................................... 18 Newark Community Center Annex ................................................................................... 19 Clark W. Redeker Senior Center........................................................................................ 34 George M. Silliman Community Activity Center.............................................................. 36 Ash Street Recreation......................................................................................................... 40 Birch Grove Park Restrooms .............................................................................................. 41 Lakeshore Park Boathouse ................................................................................................ 42 Newark Community Park Restrooms ................................................................................ 43 Alan L. Nagy Library ........................................................................................................... 44 Sportsfield Restroom.......................................................................................................... 45 Old Newark Library ............................................................................................................ 46 Watkins Hall......................................................................................................................... Packet Page No. 143447 TABLE OF CONTENTS ii
PMT REV I EW DRAFT 07/08/2024

CITY OF NEWARK FACILITIES MASTER PLAN

3. Administration, Public Safety, and Service Facilities..................................................... 49 David W. Smith City Hall .................................................................................................... 51 Fire Station 27..................................................................................................................... 62 Fire Station 29..................................................................................................................... 63 Fire Station 28..................................................................................................................... 68 Newark Police Department ............................................................................................... 72 Newark Service Center....................................................................................................... 76 Second Chance Emergency Shelter ................................................................................. 78 Old Fire Station................................................................................................................... 79 Packet Page No. 1435

INTRODUCTION
Packet Page No. 1436
4 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2024

1. INTRODUCTION

I NTRODUCT I ON

EXECUTIVE SUMMARY
For 70 years, the City of Newark has been a part of Alameda County, California. The city has changed a lot in those seven decades, evolving from the railroad and agricultural to the biotech and health sciences industries. Though Newark was incorporated within the last century, its community can be traced back 150 years. Today, the City of Newark owns and operates 24 facilities that serve vastly different purposes; aquatic recreation, library, park restrooms, shelters for residents experiencing barriers, public safety, and more. With such a strong community and deep roots in the Bay Area, the investments that Newark makes in their facilities will work to emphasize and improve what already exists, while propelling the city into a new era of service.

The City of Newark began a facility master plan process in 2022 with Group 4 Architecture with the goal of planning for the city’s future growth and developing needs. The objectives for this process included a master plan for the near future (1-3 years), and long term (5-10+ years) as well as a strategy for capital investments in city facilities. Throughout the master planning process, city leadership and staff have been involved during every step of the process so that each decision and recommendation is realistic and caters directly to the needs of all Newark residents.

The thorough engagement process for this master plan helped to create the best plan possible. Newark residents were able to help envision the future of their city by participating in engagement and providing opinions on potential types of public spaces and project site options. Over several months, in-person pop-ups at city events, community meetings, and online surveys were used for two rounds of engagement to ensure a diverse range of needs and opinions were reflected in the final plan and recommendations.

Packet Page No. 1437
5 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2024

1. INTRODUCTION

NEWARK FACILITIES MAP
an

DRAFT FOR INTERNAL USE ONLY

SPORTSFIELD RESTROOM
6City of Newark Facilities Master Plan
MAP

DRAFT FOR INTERNAL USE ONLY

SPORTSFIELD RESTROOM
an
MAP

DRAFT FOR INTERNAL USE ONLY

SPORTSFIELD RESTROOM
84 880 Hanse n Ave
Logan Dr
Nicol et A
ve
Farwell Dr
Alder
Ave
Smith Ave
Mowry
Ave
Blvd
Central Ave
Cherry St
Cherry St
Cedar Blvd
Cedar Blvd
Quarry Lakes
Regional Rec
Area
Centerville
District
k
629 ft
Auto Mall Pkwy
Logan Dr
Roberts Ave
Porter St
Canyon Height s Dr
Doane St
Carol Ave
Country Dr
Castro Ln
Albrae St
Stevenson Blvd
Fremont Blvd
Washington Blvd
Driscoll
Rd
Walnut Ave
Osgood Rd
Niles
Community
Park
Central Park
Lake Elizabeth
Shinn
Irvington
District
Fremont
Christy St
Boscell Rd
Boyce Rd
S Grimmer Blvd
84 880 Hanse n Ave
Logan Dr
Nicol et A
ve
Farwell Dr
Alder
Ave
Smith Ave
Mowry
Ave
Blvd
Central Ave
Cherry St
Cherry St
Cedar Blvd
Cedar Blvd
Quarry Lakes
Regional Rec
Area
Centerville
District
k
629 ft
Auto Mall Pkwy
Logan Dr
Roberts Ave
Porter St
Canyon Height s Dr
Doane St
Carol Ave
Country Dr
Castro Ln
Albrae St
Stevenson Blvd
Fremont Blvd
Washington Blvd
Driscoll
Rd
Walnut Ave
Osgood Rd
Niles
Community
Park
Central Park
Lake Elizabeth
Shinn
Irvington
District
Fremont
Christy St
Boscell Rd
Boyce Rd
S Grimmer Blvd

VACANT FACILITIES
1 ASH STREET CENTER, RESTROOM,

AND VIOLA BLYTHE COMMUNITY

SERVICE CENTER
37365 Ash Street
• Ash Street Center: 1,968 SF
• Restroom: 1,100 SF
• Viola Blythe: 960 SF
2 BIRCH RESTROOM @ BIRCH GROVE
PARK
38080 Birch Street
• 900 SF
3 BOATHOUSE@ LAKESHORE PARK
Chelsea Drive
• 300 SF
6 NEWARK COMMUNITY CENTER,

ANNEX AND RESTROOM
35501 Cedar Blvd.

CC000 S
7 FIRE STATION 27
39039 Cherry Drive
• 7,005 SF
8 FIRE STATION 28
7550 Thornton Avenue
• 18,000 SF
9 FIRE STATION 29
35775 Ruschin Drive
• 5,450 SF
8 OLD FIRE STATION LOCATION
7700 Thornton Avenue
• 4,852 SF
9 OLD NEWARK LIBRARY LOCATION
6300 Civic Terrace
• 15,000 SF
11 CLARK W. REDEKER NEWARK

SENIOR CENTER
7401 Enterprise Drive
• 7,300 SF

SECOND CHANCE SHELTER
6516 Central Avenue
• 3,116 SF
12 SERVICE CENTER (NEWARK PUBLIC

WORKS MAINTENANCE)
37440 Filbert Street
• 24,700 SF
13 GEORGE M. SILLIMAN COMMUNITY

ACTIVITY CENTER AND SPORTSFIELD

SCOREKEEPER HUT
6800 Mowry Avenue
• Phase I: 36,410 SF
• Phase II: 32,320 SF
• Sportsfield Scorekeeper Hut: 680 SF
14 SPORTSFIELD RESTROOM @

NEWARK MEMORIAL HIGH SCHOOL
3911 Cherry Street
• 680 SF
15 WATKINS HALL
18 DAVID W. SMITH CITY HALL
37101 Newark Blvd.
• 25,638 SF
4 ALAN L. NAGY LIBRARY
37055 Newark Blvd.
• 25,580 SF
5 NEWARK POLICE DEPARTMENT
37077 Newark Blvd.
• 23,987 SF
10 4
10 2
7 15
14 16
17 an

LITIES MAP

DRAFT FOR INTERNAL USE ONLY

SPORTSFIELD RESTROOM
6City of Newark Facilities Master Plan
Packet Page No. 1438
6 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2024

1. INTRODUCTION

PLAN SUMMARY
Within the last 14 months, the planning process for the City of Newark has included thorough analysis, close work with city staff and administration, and public engagement which led to the development of a plan for Newark’s facilities that works with what the city already has, and channels effort into identified areas of need. The following are strategies that were determined throughout the planning process and target areas that the City of Newark can invest in to increase the number of services and programs provided and functionality across the board.
▪ Protecting capital assets
▪ Reinvesting in the Community Center
▪ Rethinking the Clark W. Redeker Senior Center
▪ Addressing the condition of two Fire Stations
▪ Investing further in aquatic recreation

PROJECT GOALS AND PURPOSE
The goals for this planning process align with the City of Newark’s original vision for the project and created a detailed and focused framework for the planning approach.

1. ASSESS
Assess facility needs and conditions

2. DETERMINE GROWTH
Determine growth and future needs

3. ENGAGE
Engage the Newark community about community program
and space needs

4. DEVELOP
Develop recommendations and options with supporting
cost estimates

5. PLAN
Create an action plan to guide and improve future decisionmaking about programs, services, workflow, and facilities Packet Page No. 1439
7 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2024

1. INTRODUCTION
TASK 1: EX I ST I NG COND I T I ONS EVALUAT I ON

WORK PLAN AND PARTICIPATION PLAN
This facilities master plan focused on four main studies. The first being an existing space analysis of City Hall to examine the efficiency of the building’s layout. The second study looked at the functionality and health of the city’s existing community facilities such as the Newark Community Center and Annex, Service Center, Senior Center, and Silliman Center. The third study was a space analysis of the remaining Newark facilities, and the last study, performed by TenOver Studio, examined the condition and functionality of Newark’s existing Fire Stations (27, 28, and 29).

The existing City Hall building currently contains staff from six different departments: City Administration (City Manager, City Attorney, City Clerk, Human Resources), Information Technology (IT), Finance, Community Development, Public Works, and Fire Prevention. As part of the planning process, Group 4 attended a walkthrough of the building’s public and staff spaces to assess how space is currently used by the city. From this, Group 4 created floor plan diagrams which were confirmed by Newark’s administrative team.

Group 4 then walked through Newark’s community, recreation, and aquatic facilities to determine whether the city’s recreation and community space needs are being met. The project team paid special attention to the current Newark Community Center which is functioning suboptimally. From this, Community Center options were brought to the public for input.

Ten Over Architects walked through and determined the existing conditions of the three Fire Stations in Newark as well as the Police Station and reported their findings back to the project management team.

Additionally, Aquatic Design Group performed an analysis of the Silliman Center, Newark’s aquatic facility.

Packet Page No. 1440
8 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2024

1. INTRODUCTION

FACILITY CONDITION ASSESSMENTS
To understand the full range of needs for each of Newark’s facilities, facility condition assessments were conducted. These assessments resulted in reports that detail the health of each building structure. They outline maintenance and accessibility issues, if any, as well as provide FCI (facility condition index) percentages for the current year, 3 years, 5 years, and 10 years into the future. FCI numbers show the percentage of a building and its components that will need replacement or maintenance.

Process:
▪ Pre-Survey: The Project Management Team completed
pre-survey questionnaires prior to site visits and reviewed existing building data.
▪ Assessments: Bureau Veritas (BV) visited each facility and inspected building systems including the surrounding site and infrastructure, exterior and building envelope, roof and rooftop systems, interiors & accessibility, and life safety systems. BV then identified deficiencies in the existing buildings and developed repair/ replace recommendations.

Finally, BV created cost estimations and a maintenance
plan.

Left: Facility Condition Assessment report cover for the Community Center Right: City Hall FCA report building and site information Facility Condition Index (FCI) for the
Community Center projected out 10 years
Packet Page No. 1441
9 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2024

1. INTRODUCTION
Facility Condition Assessments Summary Table
9City of Newark Facilities Master Plan
FACILITY CURRENT FCI 3-YEAR FCI 5-YEAR FCI 10-YEAR FCI
Ash Street Park Bldgs 2.1% 5.0% 9.8% 28.9%
Birch Grove Restroom 0.0% 3.3% 22.6% 29.8%
Boathouse 0.9% 0.9% 9.7% 12.4%
Newark Community Center Annex 8.7% 10.0% 14.2% 29.5%
Newark Community Center 13.0% 13.8% 16.2% 23.5%
Community Center RR 2.7% 35.4% 37.5% 93.3%
Fire Station 27 8.8% 10.2% 12.8% 25.2%
Fire Station 28 0.4% 1.2% 3.2% 9.5%
Fire Station 29 5.5% 7.7% 11.7% 19.8%
Old Fire Station 13.1% 13.5% 21.6% 27.1%
Old Library 8.1% 17.1% 18.7% 22.7%
Clark W. Redeker Senior Center 0.3% 2.7% 4.9% 22.9%
Second Chance Shelter 0.7% 2.7% 6.6% 22.6%
Newark Service Center 4.0% 8.5% 14.0% 24.7%

0.8% 2.6% 7.5% 20.5% George M. Silliman Community
Activity Center
Sports Field Restroom 0.6% 8.9% 14.5% 41.0%
Watkins Hall 12.6% 21.9% 24.2% 25.4%
David W. Smith City Hall 0.0% 0.0% 0.1% 3.8%
Alan L. Nagy Library 0.0% 0.0% 0.0% 4.5%
Newark Police Department 0.1% 0.1% 0.1% 3.5%

FACILITY CONDITION ASSESSMENTS

DRAFT FOR INTERNAL US
Restroom
Packet Page No. 1442
10 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2024

1. INTRODUCTION
TASK 2: FUTURE SPACE NEEDS ASSESSMENT
In order to determine the future space needs of Newark, Group 4 engaged with the community through pop-up events and conducted a community survey to ask about public space and recreation needs. With the guidance and approval of the Project Management Team (PMT), Group 4 additionally conducted calculations of existing David W. Smith City Hall space and examined future staff growth to determine adequate space recommendations.

TASK 3: C I TY ALTERNAT I VE FAC I L I T I ES OPT I ONS Based on the results of this plan’s public engagement efforts with the residents of Newark in combination with the prepared facility condition assessments, alternative options were developed specifically for the Newark Community Center located in Newark Community Park. Some of these options include changes to the Clark W.

Redeker Senior Center and Newark’s Old Library.

Further information on the future space needs assessment and the city alternative facilities options for each of Newark’s facilities can be found in the following facility sections.

Packet Page No. 1443
11 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2024

1. INTRODUCTION
TASK 4: COST AND I MPLEMENTAT I ON PLAN
The facility condition assessments included an identification of deficiencies, inventory of assets, repair and replace recommendations and a maintenance plan identifying expenditures for immediate to long-term costs. The table summarizes those expenditures for all facilities as well as expenditures when the City excludes its vacant facilities (the old library, old fire station and Watkins Hall) and those facilities identified to be replaced or renovated (Newark Community Center, Fire Station 27 and Fire Station 29). It also highlights those expenditures specifically associated as safety to be addressed as an immediate need and costs. The facility costs below are costs to maintain and repair the current facilities and do not address costs associated with upgrading a facility to current codes, meet operational requirements or respond to community needs.
10City of Newark Facilities Master Plan

FACILITY MAINTENANCE COSTS
Long Term TOTAL
(11-20 yrs.)
Mid Term
(6-10 yrs.)
Near Term
(3-5 yrs.)
Short Term
(1-2 yrs.)
Immediate
Total expenditures for ALL $8.15M $4.08M $9.93M $20.41M $57.53M $100.1M facilities
Total expenditures for facilities $1.72M $2.74M $7.38M $15.63M $44.99M $72.46M EXCLUDING Community
Center-Annex-Restroom, Fire
Station 27 and 29, Watkins Hall,
Old Fire Station and Old Library
Total expenditures for ALL $500K
facilities for Safety Plan Type
costs
Total expenditures for facilities $52K
for Safety Plan Type costs
EXCLUDING Community
Center-Annex-Restroom, Fire
Station 27 and 29, Watkins Hall,
Old Fire Station and Old Library

DRAFT FOR INTERNAL USE ONLY
Facility Maintenance Cost Table
Packet Page No. 1444
12 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2024

1. INTRODUCTION
Based on the facility maintenance costs, a table was created to determine which facilities the City should maintain, renovate, replace or sell/repurpose. The facilities in the maintain facilities column currently meet the community needs and generally meet operational requirements. Those listed as renovate require futher costs to bring them up to code and operational requirements. Facilities identified as replace require significant costs to bring them up to code and operational requirements and do not address the community needs identified during the community outreach.

The facilities listed as sell/repurpose require further study by the City. During the community outreach no need was identified for those facilities and/or their locations.

These facilities would also require significant cost to bring them up to current building and life safety code if a new use was identified.
13City of Newark Facilities Master Plan

FACILITY RECOMMENDATION

FACILITY MAINTAIN RENOVATE REPLACE SELL OR REPURPOSE
Ash Street Park Bldgs
Birch Grove Restroom
Boathouse
Newark Community Center
Annex
Newark Community Center
Newark Community Center RR
Fire Station 27
Fire Station 28
Fire Station 29
Old Fire Station
Old Library
Clark W. Redeker Senior Center
Second Chance Shelter
Newark Service Center
George M. Silliman Center
Sports Field Restroom
Watkins Hall
David W. Smith City Hall
Alan L. Nagy Library
Newark Police Department
BASED ON 5-YEAR FCI

INDICATE SHORT TERM NEEDS
PAGE #
40 41
42 19
18 43
62 68
63 79
46 34
78 76
36 45
47 50
44 72
Newark facility recommendation summary table with corresponding report pages.

Packet Page No. 1445
13 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2024

1. INTRODUCTION
At the conclusion of the community outreach, facility assessments, and needs study, an implementation plan for the City was identified. The projects identified take into account, not only the condition of the facility but also respond to the communities’ priorities and needs. The table below summarizes each of the facility projects and categorizes them in immediate/short-term vs long-term needs. The project costs associated with each project is a rough order of magnitude cost that was generated based of a $/SF for building and site costs, and assumes a publicly bid process using prevailing wages. It takes into account any associated furniture, fixtures, and equipment (FFE), and technology costs as well as soft costs including design and construction management fees and city administration and permit fees. These project costs also include a construction and project contingency. The project costs do NOT include escalation as these projects are currently unfunded with no associated timeline for design and construction.

The City also identified a number of funding strategies:
▪ State & Federal grants: a financial award given by a government or other outside agency for beneficial projects.
▪ Measure GG: 1/2 cent sales tax approved by voters in 2016. ▪ Development Impact Fees: One-time charges imposed by the City on new or proposed development projects.
▪ Capital Funds: Newark’s existing or anticipated revenue. ▪ Other: local bond measures
Final recommendations & directions paragraph to be added after City Council presentation
79City of Newark Facilities Master Plan

FACILITY IMPROVEMENT PROJECTS
Long Term
(11-20 yrs.)
Mid Term (5-
10 yrs.)
Near Term
(3-5 yrs.)
Immediate &
Short Term
Project Costs
$7-9M
($5-6M)
($1-1.5M)
($1-1.5M)
Improvement to George M. Silliman Center
• Updated pool amenities
• Improve Check-in and Staff Workspaces
• Ninja Cross and Aquatic Fitness

AQUATICS
New 18-32k SF Community & Arts Center @ $31-56M
Community Park

COMMUNITY &
ARTS
$3-4M
$23-28M
Improvement to Silliman Center
• Improved Storage
• Evaluate underutilized space for additional
program opportunities
• Evaluate additional gym and courts
w/indoor walk/run track

RECREATION
Minor improvements to David W. Smith $1.5-2M
City Hall
DAVID W. SMITH

CITY HALL
$18.5-23M
($3-4M)
($7-8M)
($2-3M)
($.5-1M)
($6-7M)
Improvements to Newark Service Center
• New Admin Building
• New maintenance bays (4)
• Update locker/changing rooms and break
room
• Update HVAC in Shop Bldg.
• Additional covered parking

SERVICE CENTER
$15-19M
$15-19M
$1.5-2M
New 8-10k Fire Station 27
New 8-10k Fire Station 29
Upgrades to Fire Station 28
FIRE
Minor improvement to Newark Police $2-2.5M
Department
POLICE
SAFETY ISSUES $52-500K
$45-

57.6M
$15.7-

20.5M
$4.5- $7.4-10M

12.3M

MAINTENANCE

DRAFT FOR INTERNAL USE ONLY
Facility Improvement Projects
Packet Page No. 1446
14 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2024

1. INTRODUCTION

PROJECT PARTICIPATION
Project Management Team (PMT), City of Newark
Roya Gonzalez, Senior Management Analyst
David Benoun, Newark City Manager
Lenka Hovorka, Assistant City Manager
Steven Turner, Community Development Director
Soren Fajeau, Public Works Director
Nick Cuevas, Recreation & Community Services Director
Packet Page No. 1447
15 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2024

1. INTRODUCTION

CONSULTANT TEAM
Group 4 Architecture, Research + Planning, Inc.
211 Linden Avenue
South San Francisco, CA 94080
Andrea Gifford, Principal
Grace Tilghman, Planner
Nicole Ghiselli, Architect
650.871.0709 | www.g4arch.com
TenOver Architects
Candice Wong, Principal
Jesse Pereira, Project Architect
805.541.1010 | www.tenoverstudio.com
Bureau Veritas Technical Assessments
Erik Piller, Senior Vice President
Mary Venable, Lead Project Manager
800.733.0660 | www.bureauveritas.com
TBD Consultants
Gary Holland, Principal
415.981.9430 | www.tbdconsultants.com
Aquatic Design Group
Dennis Berkshire, President
Michelle Gable, Associate
760.438.8400 | www.aquaticdesigngroup.com
Packet Page No. 1448
16 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2024

1. INTRODUCTION
Packet Page No. 1449

COMMUNITY, RECREATION, AND

AQUATIC FACILITIES
Packet Page No. 1450
18 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2024

2. COMMUNITY, RECREATION, AND AQUATIC FACILITIES
RECOMMENDATION: REPLACE

NEWARK COMMUNITY CENTER
Address: 35501 Cedar Boulevard,
Newark, CA 94560
Built: 1968
Size: 13,400 square feet
Site Area: 3.75 acres
Estimated Project Cost:
18,000 SF Facility: $30,796,000
25,000 SF Facility: $44,289,000
32,000 SF Facility: $56,399,000
YEAR FCI (Facility Condition Index)
Current 13.0%
3-Year 13.8%
5-Year 16.2%
10-Year 23.5%
Packet Page No. 1451
19 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2023

2. COMMUNITY, RECREATION, AND AQUATIC FACILITIES
RECOMMENDATION: REPLACE

NEWARK COMMUNITY

CENTER ANNEX
Address: 35501 Cedar Boulevard,
Newark, CA 94560
Built: 1991
Size: 3,000 square feet
Site Area: 3.75 acres
Estimated Project Cost:

See Community Center
YEAR FCI (Facility Condition Index)
Current 8.7%
3-Year 10.0%
5-Year 14.2%
10-Year 29.5%
Packet Page No. 1452
20 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2024

2. COMMUNITY, RECREATION, AND AQUATIC FACILITIES

NEWARK COMMUNITY CENTER EXISTING CONDITIONS
The Newark Community Center was built in 1968 and has nearly 14,000 square feet across a single story.

What was once a community space for city activities and programs, room rentals, and childcare, has become mostly unoccupiable to the public except for opportunities to rent out rooms for personal events and parties.

At its peak, there were functioning staff offices, a reception and lobby space, a patio room and social hall for renting, an arts and crafts room, storage, meeting space, and kitchen. In the center of the building is a large courtyard which connects the Newark Community Center to the Newark Community Center Annex, which is presently used for a popular pre-school childcare program. Newark Community Center observations are listed below.

Exterior
▪ Building shows signs of wear and has significant maintenance needs. ▪ Significant water damage to roof and walls.

Interior
▪ Staff offices in the front of the building are not able to be occupied due to water leakage and intrusion, and rooms have been locked.
▪ Poor air quality and water damage in the downstairs area, currently locked and not used. ▪ Roof and skylights leak; have water stains and also actively drip and need buckets to catch falling water. ▪ Interior finishes affected by water damage, include fungal concerns. 11City of Newark Facilities Master Plan

STING FLOOR PLAN COMMUNITY CENTER
Existing Newark Community Center & Newark Community Center Annex Floorplan & Programming
9 City of Newark Facilities Master Plan
COMMUNITY CENTER ANNEX BUILT: 1991 3,000 SF
HOUSE

BACK OF
SPACE
PUBLIC
SPACE
STAFF
Patio Room
Packet Page No. 1453
21 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2023

2. COMMUNITY, RECREATION, AND AQUATIC FACILITIES
ROUND 1 COMMUNITY ENGAGEMENT
Collecting Newark community’s input on city facility needs was an essential part of this planning process. With the PMT’s approval and edits, Group 4 developed 5 large boards to bring to various community events as pop-ups. This first round of engagement included two in-person pop-up events plus a community survey. Nearly 600 residents participated.

The engagement boards explained the current use of each of Newark’s facilities, as well as the regional planning standards for Northern California. The boards asked residents about their opinions (love it or change it) on their facilities as well as asked about their community space priorities. To inquire about residents’ community space priorities, Group 4 provided 23 space options for participants to place a vote/ dot.

These space options fell under four categories; community/ lounge, the arts and performance, exercise and recreation, and aquatics. The purpose of this exercise was to gain a better understanding of what types of spaces Newark’s residents are looking for in their city’s facilities. Below are the events that Group 4 attended for round one engagement pop-ups.
▪ Family Day at the Park (4/12/23)
▪ Groovin’ at the Grove (6/16/23)
290 ft
Alam eda Creek
Marshlands Rd
C o y o t e H i l l s
28 ft
Paseo Padre Pkwy
84 84
84 880 Hanse n Ave
Logan Dr
Nicol et Ave
Farwell Dr
Alder Ave
Smith Ave
Ca bral Dr
Darwin Dr
Haley St
Mowry Ave
Sycamore St
Bett encourt St
Fremont Blvd
Central Ave Central Ave
Cherry St Cherry St
Newark Blvd
Lowry Rd
Deep Creek Rd
Cedar Blvd
Cedar Blvd
Cedar Blvd
Ardenwood Blvd
Paseo Padre Pkwy
Quarry Lakes
Regional Rec
Area
Ardenwood
Historic Farm
Centerville
District
Jarvis Landing
Newark
4 ft
Plummer C r eek
629 ft
Auto Mall Pkwy
Logan Dr
Roberts Ave
Porter St
Canyon Height s Dr
Doane St
Carol Ave
Country Dr
Castro Ln
Albrae St
Stevenson Blvd
Fremont Blvd
Washington Blvd
Driscoll Rd
Walnut Ave
Osgood Rd
Niles
Community
Park
Central Park
Lake Elizabeth
Shinn
Irvington
District
Fremont
M ud Sl ough Lakeview Blvd
Kato Rd
Christy St
Boscell Rd
Boyce Rd
S Grimmer Blvd
Fremont Blvd
Cushing Pkwy Albrae
City of Fremont, California State Parks, Esri, HERE, Garmin, SafeGraph, GeoTechnologies, Inc, METI/NASA, USGS, Bureau of Land Management, EPA, NPS, USDA, Esri, NASA, NGA, USGS, FEMA Total Population (2020)
Median Household
Income (2020)
Median Age (2020)

FACILITIES MASTER PLAN

IMAGINE

CITY OF NEWARK

YOUR COMMUNITY
Project Schedule
47,530 36.6 $127,619
Total Housing
Units (2020)
15,371
Average Household
Size (2020)

3.61 persons
Race & Ethnicity Education
% of pop. > 25 years old
Asian
Hispanic/Latino
White
Black/African American
Other groups
High School
Some College
Associates
Bachelor
Graduate
19,800
14,360
10,760
1,580
1,020

27.2%

20.3%

6.0%
23%

14.8%
Source: 2020 Decennial Census; 2020 ACS 5-Year Estimates

FACILITIES MASTER PLAN

CITY OF NEWARK

FACILITIES MAP
PLANNING STANDARDS Facility Use

CITY OF NEWARK

FACILITY USE MATRIX CITY OWNED
CITY HALL NEWARK LIBRARY CLARK W. REDEKER

NEWARK SENIOR CENTER

SILLIMAN ACTIVITY &

FAMILY AQUATIC CENTER AGE SERVED NEWARK COMMUNITY CENTER Tots – 3-5 years old
Youth – 5-13 years old
Teen – 13-18 years old
Adult – 18+ years old
Senior – 55+ years old
DRAFT
*spaces available to the general public by reservation

FACILITY

WHAT ARE Y

FACILITY USE MATRIX CITY OWNED

NEWARK LIBRARY
(Managed by Alameda County Library) CITY HALL CLARK W. REDEKER

NEWARK SENIOR CENTER

SILLIMAN ACTIVITY &

FAMILY AQUATIC CENTER

NEWARK COMMUNITY
CENTER COMMUNITY SPACES # seats
– MEETING - 12– MEETING - 12
Conference 4 – 14
+ (2) CLASSROOMS - 20
Small Classroom 15 – 30
o MEETING - 45
Medium Classroom 30 – 50
+ CHILDREN’S READING ROOM
oPRESCHOOL
o (2) PRESCHOOL - 15
Preschool Classroom 35 SF/child
+ MAKERSPACE
15 – 50 Art Classroom (Hard Floor)
– MEETING – 44-105
o CHAMBERS - 100
+ ACTIVITY ROOM - 80
o ACTIVITY ROOM - 80
+ PATIO ROOM - 85
Community Meeting 50 – 150
+ SOCIAL HALL - 150
Community Hall 150 – 300
Black Box Theater 150-250
300 – 500 Community
Performance
+ TEEN LOUNGE
+ BILLIARDS AREA + GREAT ROOM
+ TEEN/ GAME ROOM - 75
Lounge varies
Provided and Available +
Provided w/ Limited Availability o
Provided and Not Available –

FACILITY USE MATRIX CITY OWNED
CITY HALL NEWARK LIBRARY CLARK W. REDEKER

NEWARK SENIOR CENTER

SILLIMAN ACTIVITY &

FAMILY AQUATIC CENTER

NEWARK COMMUNITY
CENTER

RECREATION
SPACES
Group Fitness Studio o
Dance Studio o
Gymnasium o
Exercise Room + +
Running Track
Lap pool o
Family Pool o
Lazy River o
Aquatic Event Room(s) o
Provided and Available +
Provided w/ Limited Availability o
Provided and Not Available –
25Newark City Facilities Master Plan PMT Meeting 03/22/2023

PLANNING STANDARDS COMMUNITY FACILITIES
Existing Facilities (SF)
New Facility / Addition
(SF)
Indoor Community Facilities -
Total (SF)
Indoor Community Facilities -
SF/ Resident
.75 43,200 0 79,030

1.00 57,600 0 79,030

1.25 72,000 0 79,030

1.5 86,400 + 7,370 79,030

1.75 100,800 + 21,770 79,030

2.00 115,200 + 36,170 79,030
2040
Population
2020 NEWARK Population
48,000 57,600
DRAFT

FACILITY USE MATRIX CITY OWNED
CITY HALL NEWARK LIBRARY CLARK W. REDEKER

NEWARK SENIOR CENTER

SILLIMAN ACTIVITY &

FAMILY AQUATIC CENTER

NEWARK COMMUNITY
CENTER

RECREATION
SPACES
Group Fitness Studio o
Dance Studio o
Gymnasium o
Exercise Room + +
Running Track
Lap pool o
Family Pool o
Lazy River o
Aquatic Event Room(s) o
Provided and Available +
Provided w/ Limited Availability o
Provided and Not Available –
23Newark City Facilities Master Plan PMT Meeting 03/22/2023 NEWARK

PLANNING STANDARDS INDOOR PARK & RECREATION FACILITIES
~0.75-2 SF/RESIDENT
for Indoor Community Facilities
NRPA’s 2022 Agency Performance Review – Indoor Park Facilities Nationwide
Agencies Newark Pacific Southwest
Facilities -
Prevalence
Population
per Facility
Facilities -
Prevalence
Population
per Facility
✓ 49,903 74% 31,329 64% Recreation Center (Including Gyms) Community Centers ✓ 46,000 67% 29,036 59%
Senior Center ✓ 117,335 54% 59,603 41%
123,850 37% 68,181 36% Performance
Amphitheaters
Aquatics Center ✓ 91,706 31% 53,025 25%
Nature Center 268,689 29% 114,696 31%
Teen Center 98,206 26% 57,109 14%
Stadium 160,731 13% 75,026 17%
Arenas 91,411 10% 65,466 7%
Indoor Ice Rink 141,864 7% 50,863 12%
24Newark City Facilities Master Plan PMT Meeting 03/22/2023

PLANNING STANDARDS COMMUNITY/RECREATION/AQUATICS FACILITIES Rental Only
Space
(excluded in
indoor
facilities total)
Early
Childhood
Recreation
(SF)
Youth
Center (SF)
Senior
Center (SF)
Aquatic
Center (SF)
Recreation
Center (SF)
Community
Center (SF)
Indoor Facilities
- Total SF
Indoor
Facilities -
SF/
Resident
2040
Population
2020 CITY Population
20,500 20,000
14,000 14,000 8,100
21,000
2,000
6,000
6,000
Fremont 231,670 275,440 0.41 111,600
8,600
3,000 15,900 14,700 22,400 3,200 56,7001
6,400 66,190 86,390 1.51 130,900 South San
Francisco
Union City 68,700 79,850 1.52 105,000 21,000 40,000 10,000 20,000 14,000 1,200
2,300 31,900 16,900 19,700
13,000 Dublin 71,050 79,726 1.07 85,000
39,500 10,000 12,700 900 4 San Bruno 44,410 57,990 1.09 63,100 39,000 9,600 3 Foster City 32,390 35,420 1.47 52,200 3,600 15,000 17,000
3,800 San Carlos 29,450 34,290 1.04 35,800
13,3406 3,000
8,000 Newark 48,900 57,600 1.37 79,030 24,410 32,320 7,300 4,000 Indoor Park & Recreation Facilities Community Facilities Community/ Recreation/ Aquatics Facilities
*some spaces only available to the public by reservation Packet Page No. 1454
22 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2024

2. COMMUNITY, RECREATION, AND AQUATIC FACILITIES
Round 1 Engagement Results
Community members adding votes to their
space priorities at Groovin' at the Grove.

Engagement pop-up tent for Family Day in the
Park.

AQUATICS
The residents of Newark prioritize access to aquatic centers.

Many were in agreement that indoor/ outdoor aquatics
experiences, aquatic recreation such as Ninja Crossovers for pools, and aquatic fitness.

THE ARTS
The Newark community values the arts and sees the importance of public space for opportunities to hold theater performances, somewhere to practice and play music, arts/ makerspaces, a community gallery, and video/ audio recording rooms.

COMMUNITY
Designated space for specific age groups is a priority as well; the Newark community's priorities include early childhood recreation, a senior lounge, a dedicated teen center, community hall/ kitchen, computer lab, and enrichment classrooms.

RECREATION
Newark community members value spaces which allow them
access to fitness and dance, a variety of sports with multi-use courts, health care, and personal fitness through gyms and exercise rooms.

Family Day at the Park 4/12
Packet Page No. 1455
23 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2023

2. COMMUNITY, RECREATION, AND AQUATIC FACILITIES
Packet Page No. 1456
24 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2024

2. COMMUNITY, RECREATION, AND AQUATIC FACILITIES

PLANNING STANDARDS
The existing Newark Community Center is not currently open for programs due to water damage like roof leakage and mold concerns in rooms that are not accessible and securely closed off. The only current use of this facility is renting out space to residents for event use. During public engagement, findings identified that Newark lacks an adequate community center. Additionally, there is a growing need for public performance and amphitheater space which a community center could provide.

Newark has just under 50,000 residents. Based on the Pacific Southwest’s community facility planning standards, the City of Newark should have ~0.75-2.0 square feet of indoor community facilities per resident. These planning standards also dictate that a city of Newark's size should have more robust teen center and performance amphitheater square footage. While Newark has some recreation and teen space located at the George M. Silliman Community Activity Center and the Alan L. Nagy Library, the lack of a dedicated community center and performance space creates programming and service difficulties, both of which should be readily available to the community.
23Newark City Facilities Master Plan PMT Meeting 03/22/2023 NEWARK

PLANNING STANDARDS INDOOR PARK & RECREATION FACILITIES
~0.75-2 SF/RESIDENT
for Indoor Community Facilities
NRPA’s 2022 Agency Performance Review – Indoor Park Facilities Nationwide
Agencies Newark Pacific Southwest
Facilities -
Prevalence
Population
per Facility
Facilities -
Prevalence
Population
per Facility
✓ 49,903 74% 31,329 64% Recreation Center
(Including Gyms)
Community Centers ✓ 46,000 67% 29,036 59%
Senior Center ✓ 117,335 54% 59,603 41%
123,850 37% 68,181 36% Performance
Amphitheaters
Aquatics Center ✓ 91,706 31% 53,025 25%
Nature Center 268,689 29% 114,696 31%
Teen Center 98,206 26% 57,109 14%
Stadium 160,731 13% 75,026 17%
Arenas 91,411 10% 65,466 7%
Indoor Ice Rink 141,864 7% 50,863 12%
Packet Page No. 1457
25 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2023

2. COMMUNITY, RECREATION, AND AQUATIC FACILITIES
24Newark City Facilities Master Plan PMT Meeting 03/22/2023

PLANNING STANDARDS COMMUNITY/RECREATION/AQUATICS FACILITIES Rental Only
Space
(excluded in
indoor
facilities total)
Early
Childhood
Recreation
(SF)
Youth
Center (SF)
Senior
Center (SF)
Aquatic
Center (SF)
Recreation
Center (SF)
Community
Center (SF)
Indoor Facilities
- Total SF
Indoor
Facilities -
SF/
Resident
2040
Population
2020 CITY Population
20,500 20,000
14,000 14,000 8,100
21,000
2,000
6,000
6,000
Fremont 231,670 275,440 0.41 111,600
8,600
3,000 15,900 14,700 22,400 3,200 56,7001
6,400 66,190 86,390 1.51 130,900 South San
Francisco
Union City 68,700 79,850 1.52 105,000 21,000 40,000 10,000 20,000 14,000 1,200
2,300 31,900 16,900 19,700
13,000 Dublin 71,050 79,726 1.07 85,000
39,500 10,000 12,700 900 4 San Bruno 44,410 57,990 1.09 63,100 39,000 9,600 3 Foster City 32,390 35,420 1.47 52,200 3,600 15,000 17,000
3,800 San Carlos 29,450 34,290 1.04 35,800
13,3406 3,000
8,000 Newark 48,900 57,600 1.37 79,030 24,410 32,320 7,300 4,000 Comparable cities and Newark's existing community space 25Newark City Facilities Master Plan PMT Meeting 03/22/2023

PLANNING STANDARDS COMMUNITY FACILITIES
Existing Facilities (SF)
New Facility / Addition
(SF)
Indoor Community Facilities -
Total (SF)
Indoor Community Facilities -
SF/ Resident
.75 43,200 0 79,030

1.00 57,600 0 79,030

1.25 72,000 0 79,030

1.5 86,400 + 7,370 79,030

1.75 100,800 + 21,770 79,030

2.00 115,200 + 36,170 79,030
2040
Population
2020
NEWARK Population
48,000 57,600
DRAFT Community facility planning standards
As shown in the chart above, Newark's indoor facility square feet per resident is currently 1.37 SF. Newark's goal SF/capita is between 1.5 and 1.75. The amount of indoor communty square footage needed to achieve those goals is detailed in the chart below.

Packet Page No. 1458
26 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2024

2. COMMUNITY, RECREATION, AND AQUATIC FACILITIES

ALTERNATIVE OPTIONS PROCESS
Round 1 engagement results and existing space analysis show that a larger and better functioning community center is needed. Because of Newark’s current population and projected population growth, The City needs space to provide programs, services, and recreation space to residents. Additionally identified in outreach was the need for a community performance space and/ or large community rooms.

With the PMT, Group 4 developed new potential site options for a community center, either on its existing site at Newark Community Park, or in Civic Center Park in place of the Old Library which currently is closed to the public.

Packet Page No. 1459
27 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2023

2. COMMUNITY, RECREATION, AND AQUATIC FACILITIES

COMMUNITY AND ARTS FACILITY

COMMUNITY PROGRAM OPTIONS

SQUARE FEET
~18,000 SF, 1-Story

SQUARE FEET
~25,000 SF, 2-Story

SQUARE FEET
~32,000 SF, 2-Story
1ST FLOOR FOOTPRINT
~18,000 SF
1ST FLOOR FOOTPRINT
~18,000 SF
1ST FLOOR FOOTPRINT
~20,000 SF

CAPITAL COST
$$$ − $$$$

CAPITAL COST
$$$$ − $$$$$

CAPITAL COST
$$$$$ − $$$$$$

PARKING
~60 – 130 spaces

PARKING
~80 – 150 spaces

PARKING
~105 – 175 spaces
BASE + BASE + B +
A B C
B C

LOBBY/RECEPTION
2 PRESCHOOLCLASSROOMS
STAFF + SUPPORT SPACES

BASE - A
6-8 PEOPLE
16-20 PEOPLE
34 PEOPLE
30-36 PEOPLE

ART/ MAKERCLASSROOM
34-48 PEOPLE
2 MEETING ROOMS
30-36 PEOPLE

CONFERENCEROOM
16-20 PEOPLE

SENIOR LOUNGE CONSULTATION ROOM

DANCE STUDIO MUSIC ROOM
16-20 PEOPLE

ARTS/ CERAMICSSTUDIO

COMMUNITY GALLERY

CAFE & VENDING

EXISTIN
COMMUNITY ROOMDivisible into 2: 500 people assembly, 300 banquet

CHAMBER OFCOMMERCE

COMMUNITY CENTER PROGRAM OPTIONS
Above are program options for a new community center that range in size from a single story with 18,000 square feet to 32,000 square feet with two stories. Base A includes modern community center spaces such as preschool classrooms, staff space, a large community room, gallery space, and art classrooms. Each option builds off of the last, with Option C including all of A and B program spaces as well.

Packet Page No. 1460
28 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2024

2. COMMUNITY, RECREATION, AND AQUATIC FACILITIES

NEWARK COMMUNITY PARK ANALYSIS AND OPTIONS
The Newark Community Park includes ample green space, parking, multiple sport courts such as basketball and tennis, a playground, and the NewBark Dog Park. The existing Newark Community Center building is surrounded by public and staff parking lots, one of which is shared with the NewBark Dog Park.

The above program options for a new community facility range from 18,000 square feet and 1 story to 32,000 square feet and 2 stories. Base A includes modern community center spaces such as preschool classrooms, staff space, a large community room, gallery space, and art classrooms. Options B and C build off of A, and option C includes A, B, and C spaces as the largest option.

Packet Page No. 1461
29 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2023

2. COMMUNITY, RECREATION, AND AQUATIC FACILITIES

NEWARK CIVIC CENTER PARK ANALYSIS AND OPTIONS
Newark Civic Center Park is connected to the Alan L. Nagy Library, David W. Smith City Hall, and Newark Police Department by a large parking lot and includes a large green lawn, playground, and Newark’s Old Library building that is currently not open to the public. This site option shows that a new community center could take the place of the Old Library, either by repurposing or constructing a new building in place of it.

Option A, with 18,000 square feet, requires less parking spaces, but will still encroach on the park’s existing playground and green space. As the program options get larger, more parking spaces are needed, and more of the park will become used for the new building.

Packet Page No. 1462
30 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2024

2. COMMUNITY, RECREATION, AND AQUATIC FACILITIES

COMMUNTY CENTER & ANNEX AT

COMMUNITY PARK

OLD LIBRARY AT CIVIC CENTER PARK
Base- A
(18k SF)
Base+B
(25k SF)
Base+B+C
(32k SF)
Base- A
(18k SF)
Base+B
(25k SF)
Base+B+C
(32k SF)

EVALUATION

CRITERIA
Renovate
Community
Center &
Annex
Replace
Community
Center &
Annex
Consolidate:

Relocate/
replace Senior
Center
Expanded
Community
Center
Renovate
Old Library
Replace
Old Library
Consolidate:

Relocate/
replace Senior
Center
Expanded
Community
Center

POOR FAIR EXCELLENT

OPERATIONAL EFFICIENCY

COMMUNITY NEEDS
COSTS

VISIBILITY

SYNERGY/ CONNECTIVITY

BLDG/ PARK

RELATIONSHIP

ACCESSIBILITY

ENVIRONMENT

TOP CRITERIA
Is the entrance and wayfinding to the new community
center site clear for visitors? Is the facility visible and easily identifiable as one enters the site? Does it have civic presence?

OPERATIONAL EFFICIENCY COMMUNITY NEEDS COSTS VISIBILITY Can the City continue to provide excellent programs to the residents of Newark? Does the facility enhance or decrease the number of staff required to operate the facility?

SYNERGY/ CONNECTIVITY BLDG/ PARK ACCESSIBILITY ENVIRONMENT Is there opportunity for the facility to enhance the community and be a dynamic amenity for residents? Does the facility have good connectivity to other community services, such as other community centers, schools, or parks?
Does the facility meet the needs of the Community? Does it support the programs and events for the community?
What are the total development costs? Costs including site infrastructure (sewer, water, power, roads), site entitlement costs (CEQA), site and building construction costs, and potential relocation costs for existing users?
Does the facility offer the opportunities to expand or improve the existing park amenities? Does is complement existing park use? Is there an opportunity to develop shared parking in order to conserve resources?
Are there extraordinary environmental risks associated
with the site (seismic, sea level rise) that will impact the construction costs, longevity, operations, or maintenance costs for the building or site improvements?
Is the facility easy to get to, not only by car but by alternative modes of transportation? Are pedestrians and cyclist able to navigate throughout the site? Is the circulation into and out of the site efficient, disruptive or dangerous?
FUNCTIONALITY SUSTAINABILITY Does the facility prioritize functional design and inherent flexibility to best serve the community, support the operational efficiency, and support programs now and well into the
future?
Sustainability, both environmental and operational, will be fundamental in the location and design of the community center.

GRANTSIMPACT FEES
A financial award given by a
government or other outside agency
for beneficial projects.
1/2 cent sales tax approved by voters in
2016.

One-time charges imposed by the
City on new or proposed development
projects.

Newark's existing or anticipated
revenue.

Local bond measures: a method of
borrowing money.

SITE OPTION EVALUATION
Each of the site options and program options were evaluated based on the criteria outlined above. Most importantly, operational efficiency, community needs, and cost were highlighted for all options as well as functionality and sustainability which are prerequisites and assumed to be included and improved for all future Newark projects.

As seen above, program options B and C at Newark Community Park which suggest consolidating the Newark Community Center and the Clark W. Redeker Senior Center into one new building, and expanding the Newark Community Center have most “excellent” ratings.

Packet Page No. 1463
31 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2023

2. COMMUNITY, RECREATION, AND AQUATIC FACILITIES
ROUND 2 ENGAGEMENT
The second round of community engagement for this master planning process involved bringing the site options and program options that were identified by the PMT and Group 4 to the public. These options were presented through pop-ups, community meetings, and an online community survey. Participants first chose which site they would prefer a new community center to be built on, and then which program option they would prefer on the chosen site.

Community members had the chance to engage with the pop-up boards at the following events:
▪ Newark Days (9/17/2023)
▪ Community meeting and open house at Alan L. Nagy Library (10/17/2023) ▪ Newark Tree Lighting (12/01/2023)

AQUATICS
The residents of Newark prioritize access to aquatic centers.

Many were in agreement that the availability of outdoor splashpads is important as well as indoor/ outdoor
aquatics experiences, aquatic recreation such as Ninja
Crossovers for pools, and aquatic fitness.

THE ARTS
The Newark community values the arts and sees the
importance of public space for opportunities to hold
theater performances, somewhere to practice and
play music, arts/ makerspaces, a community gallery,
and video/ audio recording rooms.

COMMUNITY
Designated space for specific age groups is a priority
as well; the Newark community's priorities include early childhood recreation, a senior lounge, a teen dedicated teen center, community hall/ kitchen, computer lab,
and enrichment classrooms.

RECREATION
Newark community members value spaces which allow
them access to fitness and dance, a variety of sports
with multi-use courts, health care, and personal fitness through gyms and exercise rooms.

Nearly 600 residents and friends of the Newark community were engaged during round 1. Engagement efforts and pop-ups happened at Newark's Day in the Park on 4/12, Groovin' at the Grove concert series, and through an online survey.

AQUATIC NEEDS: SILLIMAN CENTER
5City of Newark Facilities Master Plan

AQUATIC NEEDS

DRAFT FOR INTERNAL USE ONLY

SPLASHPAD
$$$
To be evaluated in the
Parks Master Plan.
25-YARD POOL
$$$$$
For competitive use. To
be evaluated in the Parks
Master Plan.

OUTDOOR NEEDS
(may not be at the Silliman Center)

INDOOR NEEDS
(improvements to the Silliman Center)

NINJA CROSS
$$
Located over the lap pool.

Requires coordination with
existing structural system.

AQUATIC FITNESS
$
Located within the lazy
river pool side catch area.

Require storage when not
in use.

POOL AMENITIES
$-$$
Improved food service and
seating such as picnic
tables and cabanas for
both general use and
rentals.

SILLIMAN CENTER
1 NEWARK FACILITIES MASTER PLAN
ROUND 1 COMMUNITY ENGAGEMENT RESULTS
7City of Newark Facilities Master Plan

AQUATIC NEEDS

DRAFT FOR INTERNAL USE ONLY

POOL AMENITIES
Food service
Seating: picnic tables &
cabanas

IMPROVE CHECK IN

AND STAFF

WORKSPACES

NINJA CROSS
and

AQUATIC FITNESS

FACILITY CONDITION
INDEX
3-year: 2.6%
10-year: 20.5%
1 FACILITIES MAP PROJECT SCHEDULE
The City of Newark and their consultant hired for this master planning project worked to complete facility condition assessments of all of their city-owned buildings. These assessments resulted in a final report that outlines the health of the physical building. This is shown through an FCI (Facility Condition Index) score which calculates what percent of the building needs to be replaced or renovated 3, 5, or 10 years into the future. These assessments do not focus on programming or whether the building is meeting community needs. 23Newark City Facilities Master Plan PMT Meeting 03/22/2023 NEWARK

PLANNING STANDARDS INDOOR PARK & RECREATION FACILITIES
~0.75-2 SF/RESIDENT
for Indoor Community Facilities
NRPA’s 2022 Agency Performance Review – Indoor Park Facilities Newark Pacific Southwest Nationwide
Agencies
Population
per Facility
Facilities -
Prevalence
Population
per Facility
Facilities -
Prevalence
Recreation Center (Including Gyms) ✓ 49,903 74% 31,329 64% Community Centers ✓ 46,000 67% 29,036 59%
Senior Center ✓ 117,335 54% 59,603 41%
Performance
Amphitheaters 123,850 37% 68,181 36%
Aquatics Center ✓ 91,706 31% 53,025 25%
Nature Center 268,689 29% 114,696 31%
Teen Center 98,206 26% 57,109 14%
Stadium 160,731 13% 75,026 17%
Arenas 91,411 10% 65,466 7%
Indoor Ice Rink 141,864 7% 50,863 12%
24Newark City Facilities Master Plan PMT Meeting 03/22/2023

PLANNING STANDARDS COMMUNITY/RECREATION/AQUATICS FACILITIES CITY 2020
Population
2040
Population
Indoor
Facilities -
SF/
Resident
Indoor Facilities
- Total SF
Community
Center (SF)
Recreation
Center (SF)
Aquatic
Center (SF)
Senior
Center (SF)
Youth
Center (SF)
Early
Childhood
Recreation
(SF)
Rental Only
Space
(excluded in
indoor
facilities total)
Fremont 231,670 275,440 0.57 131,600
21,000
2,000
6,000
6,000
34,000 8,100 20,000
14,000 20,500
South San
Francisco 66,190 86,390 1.51 130,900 56,7001
6,400 15,900 14,700 22,400 3,200 8,6003,000
Union City 68,700 79,850 1.52 105,000 21,000 40,000 10,000 20,000 14,000 Dublin 71,050 79,726 1.07 85,000 19,700
13,000 31,900 16,900 1,200
2,300
San Bruno 44,410 57,990 1.09 63,100 39,5004 10,000 12,700 900 Foster City 32,390 35,420 1.47 52,200 3,600 39,0003 9,600 San Carlos 29,450 34,290 1.04 35,800 17,000
3,800 15,000
Newark 48,900 57,600 1.37 79,030 24,410 32,320 7,300 4,000 3,000 8,000 15,0006

PLANNING STANDARDS & ENGAGEMENT

CITY OF NEWARK

PLANNING STANDARDS
COMMU
25Newark City Facilities Master Plan PMT Meeting 03/22/2023

PLANNING STANDARDS COMMUNITY FACILITIES
Indoor Community Facilities -
SF/ Resident
Indoor Community Facilities -
Total (SF)
New Facility / Addition
(SF) Existing Facilities (SF)
.75 43,200 0 79,030

1.00 57,600 0 79,030

1.25 72,000 0 79,030

1.5 86,400 + 7,370 79,030

1.75 100,800 + 21,770 79,030

2.00 115,200 + 36,170 79,030
NEWARK 2020
Population
2040
Population
48,000 57,600
DRAFT

COMMUNITY CENTER CC ANNEX SENIOR CENTER
10-YEAR FCI: 23.5%
3-YEAR FCI: 13.0%
26Newark City Facilities Master Plan PMT Meeting 03/22/2023

PLANNING STANDARDS COMMUNITY FACILITIES
Site Options
Program SF
(FLOOR 1)
Circulation SF
(FLOOR 1)
Program SF
(FLOOR 2)
Circulation SF
(FLOOR 2)
Total
Program SF
Total
Circulation
SF
Total SF Per
Option
(Program SF+
Circulation SF)
Option A
(Base) 15,000 3,000 0 0 15,000 3,000 18,000
Option B
(A+B) 15,000 3,000 5,000 2,000 20,000 5,000 25,000
Option C
(A+B+C) 17,000 3,000 9,000 3,000 26,000 6,000 32,000
DRAFT

COMMUNITY PROGRAM OPTIONS
10-YEAR FCI: 29.5%
3-YEAR FCI: 8.7%
10-YEAR FCI: 22.9%
3-YEAR FCI: 2.7%
▪ CONSTRAINTS: mold detected in nonoccupiable areas. water damage from ongoing leaks and potential structural
issues
▪ COMMUNITY BENEFITS: large rooms
for community events with adjacent
outdoor courtyard for indoor/ outdoor
rental use
▪ CONSTRAINTS: mold detected in nonoccupiable areas. lack of proper staff and storage space
▪ COMMUNITY BENEFITS: provides
much needed early childcare with
proximity to park and playground
▪ CONSTRAINTS: current program
rooms are undersized to meet senior
needs. staff spaces are dispersed and
reaching capacity
▪ COMMUNITY BENEFITS: space for
senior activities and the opportunity
for residents to meet and interact

OLD LIBRARY
10-YEAR FCI: 22.7%
3-YEAR FCI: 8.1%
▪ CONSTRAINTS: facility is currently
unoccupied and in need of repair.
limited visibility from street
▪ COMMUNITY BENEFITS: proximity
to City Hall, Newark Library, and Civic
Park

FACILITY CONDITION ASSESSMENTS TARGET
Packet Page No. 1464
32 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2024

2. COMMUNITY, RECREATION, AND AQUATIC FACILITIES
ROUND 2 ENGAGEMENT RESULTS
Between the two site options, the Newark Community Park option was most voted for during all instances of engagement including the online survey.

The program option most popular amongst people who voted for the Newark Community Park site was Option C at 32,000 square feet.

Packet Page No. 1465
33 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2023

2. COMMUNITY, RECREATION, AND AQUATIC FACILITIES
Packet Page No. 1466
34 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2024

2. COMMUNITY, RECREATION, AND AQUATIC FACILITIES
RECOMMENDATION: MAINTAIN
CLARK W. REDEKER

SENIOR CENTER
Address: 7401 Enterprise Drive,
Newark, CA 94560
Built: 1979
Size: 7,300 square feet
Site Area: 0.84 acres
YEAR FCI (Facility Condition Index)
Current 0.3%
3-Year 2.7%
5-Year 4.9%
10-Year 22.9%
Packet Page No. 1467
35 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2023

2. COMMUNITY, RECREATION, AND AQUATIC FACILITIES

REDEKER SENIOR CENTER EXISTING CONDITIONS
Located on Enterprise Drive, the Clark W. Redeker Senior Center has 7,300 square feet of building space on a single story and sits on a 0.84-acre site next to Ash Street Park. Clark W. Redeker Senior Center also faces the Newark Service Center across the street. The site was developed in two phases, the first in 1979 and the second in 1992 and it received some updates in 2007.

Free memberships to the Clark W. Redeker Senior Center are available to anyone age 55 or older. Eligible adults can have opportunities to engage in activities such as dance, educational classes, and budget-friendly special events. Members can also get information and referrals to outside agencies for Medicare, relocation help, Social Security, and downsizing resources.

The building itself is in overall good condition, but is small, outdated, and has maintenance needs. Some of the key findings from the facility condition assessment report include the movable partitions, foodservice equipment, and ADA kitchen and laundry areas as immediate needs and in poor condition. Clark W. Redeker Senior Center, though located next to a park, is not in a prime location to provide community programs, especially to an age group that can have limited access to safe transportation options. The building lacks the space and technology to accommodate modern adult recreation needs.

Packet Page No. 1468
36 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2024

2. COMMUNITY, RECREATION, AND AQUATIC FACILITIES
RECOMMENDATION: MAINTAIN
GEORGE M. SILLIMAN

COMMUNITY ACTIVITY CENTER
Address: 6800 Mowry Avenue, Newark,
CA 94560
Built: Phase I: 2000, Phase II: 2004
Size: 68,740 square feet
Estimated Project Costs:

Recreation Improvements: $3,275,000
Aquatic Improvements: $6,672,000
YEAR FCI (Facility Condition Index)
Current 0.8%
3-Year 2.6%
5-Year 7.5%
10-Year 20.5%
Packet Page No. 1469
37 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2023

2. COMMUNITY, RECREATION, AND AQUATIC FACILITIES
GEORGE M. SILLIMAN COMMUNITY ACTIVITY CENTER EXISTING

CONDITIONS
The George M. Silliman Community Activity Center, located on Mowry Avenue, was constructed in two phases, Phase I in 2000, and Phase II in 2004. In total, the activity center has nearly 69,000 square feet of recreation space such as a large aquatic facility, teen center, and sport courts. The aquatic facility includes a large lap pool, water slide, and waterspout play structure. Observations of this facility are listed below.

Indoor Aquatics
▪ Check In and staff workspaces are outdated and limited. Currently, there is one office for the aquatics manager, a small workroom for staff and a small staff lounge. ▪ The lap pool lacks modern aquatic recreation functionality such as aquatic fitness machines and ninja cross systems.

Outdoor
▪ Not many outdoor amenities such as general seating, picnic tables and/ or cabanas.
▪ Food services areas are additionally outdated and small. 11City of Newark Facilities Master Plan

BACK OF

HOUSE PUBLIC
SPACE
STAFF
SPACE
CENTER
22 City of Newark Facilities Master Plan

EXISTING FLOOR PLAN

PHASE II
21City of Newark Facilities Master Plan

EXISTING FLOOR PLAN PHASE I
21City of Newark Facilities Master Plan

EXISTING FLOOR PLAN PHASE I
Packet Page No. 1470
38 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2024

2. COMMUNITY, RECREATION, AND AQUATIC FACILITIES
12City of Newark Facilities Master Plan

AQUATIC NEEDS
Splashpad
$$$
To be evaluated in the
Parks Master Plan
25-Yard Pool
$$$$$
For competitive use. To be
evaluated in the Parks
Master Plan
Outdoor Needs
(may not be at the Silliman Center)
Indoor Needs
(improvements to the Silliman Center)

NINJA CROSS
$$
Located over the lap pool.

Requires coordination with
existing structural system.

AQUATIC FITNESS
$
Located within the lazy
river pool side catch area.

Require storage when not
in use.

POOL AMENITIES
$-$$
Improved food service and
seating such as picnic
tables and cabanas for
both general use and
rentals.

SILLIMAN CENTER

POTENTIAL FUTURE PROJECTS
Throughout the duration of this planning process, several potential projects for the George M. Silliman Community Activity Center were identified for both the general recreation spaces and aquatics.

Recreation Projects*
Recreation spaces within the George M. Silliman Community Activity Center are in need of bigger and better storage solutions for their program spaces. Additionally, there are several areas of the recreation space that are underutilized and could be activated to provide additional programs. The Newark community expressed a need for additional multi-use gym and court space as well as an indoor walk/ run track during the community engagement process for this master plan.

Aquatic Projects*
As identified through community engagement efforts and existing facility analysis, there are aquatic needs that will be addressed through future projects such as improving and modernizing pool amenities. These amenities include food service and outdoor seating options. Additionally, the staff workspaces need updating as well as the public check in station. Also identified by the Newark community is a desire for updated aquatic recreation systems like Ninja Cross and aquatic fitness machines. *Location of potential future projects shown graphically on page 39.

Packet Page No. 1471
39 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2023

2. COMMUNITY, RECREATION, AND AQUATIC FACILITIES
26City of Newark Facilities Master Plan

RECREATION NEEDS SILLIMAN CENTER

GENERAL
Improved storage for all
program spaces

GENERAL
Look at underutilized space
for additional program
opportunities

FUTURE NEEDS
Multi use gym and courts
with indoor walk/run track
1 Cit
f N
k F
iliti
M
t
Pl

AQUATIC NEEDS

POOL AMENITIES
Food service
Seating: picnic tables &
cabanas

IMPROVE CHECK IN

AND STAFF

WORKSPACES

NINJA CROSS
and

AQUATIC FITNESS

SILLIMAN CENTER
Packet Page No. 1472
40 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2024

2. COMMUNITY, RECREATION, AND AQUATIC FACILITIES
Address: 37365 Ash Street, Newark,
CA, 94560
Built*: 1970, 1979, 2002
Size: 4,430 square feet total
Site Area: 0.66 acres
*Renovation planned for FY24/25
RECOMMENDATION: MAINTAIN

ASH STREET RECREATION
YEAR FCI (Facility Condition Index)
Current 2.2%
3-Year 7.6%
5-Year 12.0%
10-Year 25.0%
Packet Page No. 1473
41 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2023

2. COMMUNITY, RECREATION, AND AQUATIC FACILITIES
RECOMMENDATION: RENOVATE
Address: 38080 Birch Street, Newark,
CA 94560
Built: 1975
Size: 900 square feet
Site Area: 0.2 acres

BIRCH GROVE PARK RESTROOMS
Interior of park restrooms
YEAR FCI (Facility Condition Index)
Current 1.8%
3-Year 3.5%
5-Year 22.6%
10-Year 29.8%
Packet Page No. 1474
42 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2024

2. COMMUNITY, RECREATION, AND AQUATIC FACILITIES
RECOMMENDATION: MAINTAIN

LAKESHORE PARK BOATHOUSE
Address: Chelsea Drive, Newark, CA,
94560
Built: 2019
Size: 300 square feet
Site Area: 0.4 acres
YEAR FCI (Facility Condition Index)
Current 0.9%
3-Year 0.9%
5-Year 9.7%
10-Year 12.4%
Packet Page No. 1475
43 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2023

2. COMMUNITY, RECREATION, AND AQUATIC FACILITIES
RECOMMENDATION: REPLACE
Address: 35501 Cedar Boulevard,
Newark, CA 94560
Built: 1991
Size: 500 square feet
*See Community Center on page 18

NEWARK COMMUNITY

PARK RESTROOMS
YEAR FCI (Facility Condition Index)
Current 2.7%
3-Year 35.4%
5-Year 37.5%
10-Year 93.3%
Packet Page No. 1476
44 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2024

2. COMMUNITY, RECREATION, AND AQUATIC FACILITIES
RECOMMENDATION: MAINTAIN
ALAN L. NAGY

NEWARK LIBRARY
Address: 37055 Newark Blvd. Newark,
CA 94560
Built: 2022
Size: 25,600 square feet
Site Area: 0.66 acres
YEAR FCI (Facility Condition Index)
Current 0.0%
3-Year 0.0%
5-Year 0.0%
10-Year 4.5%
Packet Page No. 1477
45 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2023

2. COMMUNITY, RECREATION, AND AQUATIC FACILITIES
RECOMMENDATION: RENOVATE

SPORTSFIELD RESTROOM
Address: 3911 Cherry Street, Newark,
CA 94560
Built: 1992
Size: 680 square feet
YEAR FCI (Facility Condition Index)
Current 0.6%
3-Year 8.9%
5-Year 14.5%
10-Year 41.0%
Packet Page No. 1478
46 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2024

2. COMMUNITY, RECREATION, AND AQUATIC FACILITIES
RECOMMENDATION: SELL, REPURPOSE, OR DEMOLISH
Address: 6300 Civic Terrace, Newark,
CA 94560
Built: 1983
Size: 15,560 square feet
Site Area: 1.00 acre

OLD NEWARK LIBRARY (VACANT)
YEAR FCI (Facility Condition Index)
Current 8.1%
3-Year 17.1%
5-Year 18.7%
10-Year 22.7%
Packet Page No. 1479
47 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2023

2. COMMUNITY, RECREATION, AND AQUATIC FACILITIES
RECOMMENDATION: SELL, REPURPOSE, OR DEMOLISH

WATKINS HALL (VACANT)
Address: 37013 Ash Street, Newark, CA
94560
Built: 1896
Size: 8,640 square feet
YEAR FCI (Facility Condition Index)
Current 12.6%
3-Year 21.9%
5-Year 24.2%
10-Year 25.4%
Packet Page No. 1480
48 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2024

2. COMMUNITY, RECREATION, AND AQUATIC FACILITIES
Packet Page No. 1481

ADMINISTRATION, PUBLIC SAFETY,
& SERVICE FACILITIES
Packet Page No. 1482
50 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2024

3. ADMINISTRATION, PUBLIC SAFETY, & SERVICE FACILITIES
RECOMMENDATION: MAINTAIN
DAVID W. SMITH CITY HALL
Address: 37101 Newark Blvd. Newark,
CA, 94560
Built: 2022
Size: 25,600 square feet
Site Area: 3.84 acres
Estimated Project Costs:

City Hall Improvements: $2,037,000
YEAR FCI (Facility Condition Index)
Current 0.0%
3-Year 0.0%
5-Year 0.1%
10-Year 3.8%
Packet Page No. 1483
51 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2023

3. ADMINISTRATION, PUBLIC SAFETY, & SERVICE FACILITIES
DAVID W. SMITH CITY HALL EXISTING CONDITIONS
The David W. Smith City Hall was designed and constructed in 2020 by Perkins & Will and Webcor as part of the Civic Center campus along with the new Alan L.

Nagy Newark Library and Newark Police Department. It currently has nearly 25,600 square feet across two floors and 68 full time staff with 4 part time. It includes the City Administration (City Manager, City Attorney, City Clerk, HR), Information Technology (IT), Finance, Community Development, Public Works, and Fire prevention departments. Also located within David W. Smith City Hall are Newark’s City Council Chambers and conference room, several department workstations and conference rooms, breakrooms, two public service counters, and a large public lobby. The building is modern and full of natural light with a public staircase and elevator linking the two floors.

Public Lobbies and Service Counters
The David W. Smith City Hall currently has two service counters, a large first-floor lobby with a seating area, and a smaller lobby and two public service windows on the second floor. The service desk on the first floor mainly serves Community Development and the Public Works department, and the two windows upstairs serve the City Administration.
▪ Public lobbies and service desks are redundant and oversized. The first-floor lobby combined with the second-floor landing and second public waiting space oftentimes go unused by the public and would be much more useful as city department space.
▪ The public counter on the first floor is too large and can be reduced to make room for more workstations.
▪ Security for the first-floor service desk should be improved. 
CO
 

  
CO
CO
CO CO













        
1 A21-01
1 A21-01
3 A21-01
3 A21-01
2 A21-01
2 A21-01
4 A21-01
4 A21-01

























































         

 
















           
































 




/ 1 A11-01A/ 1 A11-01B

 




 


  
N

PROJECT NORTH

DEVELOPMENT
S

ES (MEETING, BREAK)
CES
BLDG

OFFICIAL
(1)
ECON DEV.

MGR.
(1)
ACCT
MGR.
(1)
CODE
MGR
(1)
DEPUTY
COM. DEV.

MGR
(1)
COM. DEV.

DIR.
(1)
ASST. CITY
ENG.
(1)
ENVR
SRVC
MGR.
(1)
PW

DIRECTOR
(1)

CONFERENCE
ROOM
BLDG
INSPCT
(4)
SR. BLDG
INSPCT
(1)
FIRE
vacant
(2)
FIRE
(2)
WORK
AREA
SNR
PLAN
(1)
PLAN
(1)
COM. PRES. SPECIALIST
(3)
ENG.

STAFF
(2)
ENG.

STAFF
(1)
ENG
STAFF
(1)
PW
STAFF
(1)

ENGINEERING
STAFF
(4)

PW BLDG STAFF
(2)

CONFERENCE
ROOM

FINANCE STAFF
(2)

COUNCIL

CONFERENCE
ROOM
PW
STAFF
(1)
BLDG
STAFF
(1)
WORK
AREA
WOMENS
RR
MENS
RR
RR
WOMENS
RR
MENS
RR
CD
STAFF
(1)
COFFEE

COUNCIL

CHAMBERS

ECON DEV
(2)
ELEC
AV
STG
CASH

FILES JAN

CO
CO


   
1 A21-01
3 A21-01
2 A21-01













   















:46 AM BIM 360://Newark Civic Center/NCC_ARCH.rvt
 
  

CITY COUNCIL, CITY MANAGER, CITY

ATTORNEY, CITY CLERK, & HR

INFORMATION TECHNOLOGY

FINANCE

COMMUNITY DEVELOPMENT

PUBLIC WORKS
FIRE

SHARED SPACES (MEETING, BREAK)

SUPPORT SPACES
BLDG
OFFICI
(1)
C
WOMENS
RR
STG
55City of Newark Facilities Master Plan
EXISTING FLOOR PLAN CITY HALL 1ST FLOOR

PUBLIC WORKS (PW)
Current = 23 staff

COMMUNITY

DEVELOPMENT
Current = 12 staff, 2 part time

FINANCE
Current = 11 staff

COUNTY FIRE
Current = 2 staff
Vacant = +2 staff

EXISTING FLOOR PLAN

PUBLIC WORKS (PW)
Current = 23 staff

COMMUNITY

DEVELOPMENT
Current = 12 staff, 2 part time

FINANCE
Current = 11 staff

COUNTY FIRE
Current = 2 staff
Vacant = +2 staff
55City of Newark Facilities Master Plan
EXISTING FLOOR PLAN CITY HALL 1ST FLOOR

PUBLIC WORKS (PW)
Current = 23 staff

COMMUNITY

DEVELOPMENT
Current = 12 staff, 2 part time

FINANCE
Current = 11 staff

COUNTY FIRE
Current = 2 staff
Vacant = +2 staff
Packet Page No. 1484
52 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2024

3. ADMINISTRATION, PUBLIC SAFETY, & SERVICE FACILITIES
Cubicle Work Areas
Both the first and second floor include large, open work areas with cubicles for various department staff. The department staff that work in these stations are from Public Works, Fire Prevention, Community Development, Human Resources, City Administration, Finance, and Information Technology (IT). ▪ Engineering staff workstation size can be reduced to make room for future Public Works staff additions in the southeast corner of the first floor.
▪ The main, larger open workspace has a slightly inefficient layout with some empty workstations and department work areas being used for storage.
▪ Conference room space is limited and does not
accommodate all staff needs. Because of the open cubicle layout, there are not many options for staff to take calls or mitigate noise if they do not have a personal office.




FS FS
FS FS
FS FS
FS FS
FS






        
1 A21-01
1 A21-01
3 A21-01
3 A21-01
2 A21-01
2 A21-01
4 A21-01
4 A21-01











 




























 




















           

 












          






































/ 1 A11-02A/ 1 A11-02B

 



2 A51-03

7 A32-07
8 A32-07
4 A52-02
3 A32-13















  





  
N

PROJECT NORTH
CITY
CLERK
(1)

ASSISTANT
TO CM
(1)
ACCTNT
(1)
ACCTNT
(1)
ACCTNT
(1)

FINANCE

DIRECTOR
(1)
CONF.

ROOM
CITY

ATTORNEY
(1)

IT DIRECTOR
(1)

CONFERENCE

ROOM WORK
ROOM
HR
FILES
COPY

HR WORK
AREA

HR STAFF
(3)

HR TECH
(1)
HR

DIRECTOR
(1)

BREAK ROOM

FINANCE
WORK &

STORAGE
HR
CONF
HR
FP
CM
STAFF
(2)
IT STAFF (5)
FINANCE STAFF (4) CM
STAFF
(1)
LACT.

CLERK
FILES
OCOOG

Y DEVELOPMENT
KS

CES (MEETING, BREAK)
ACES
CITY

MANAGER
(1)

IS WORK
AREA

SR MGMT

ANALYST
(1)

ASST CITY

MANAGER
(1)
RR
MAYOR
(1)
WOMENS
RR
MENS

RR SWITCH

CO

CO


   
1 A21-01
3 A21-01
2 A21-01














   
















 
:46 AM BIM 360://Newark Civic Center/NCC_ARCH.rvt
 
  

CITY COUNCIL, CITY MANAGER, CITY

ATTORNEY, CITY CLERK, & HR

INFORMATION TECHNOLOGY

FINANCE

COMMUNITY DEVELOPMENT

PUBLIC WORKS
FIRE

SHARED SPACES (MEETING, BREAK)

SUPPORT SPACES
BLDG

OFFICIAL
(1)
B
IN
FIN
COU
CONF
RO
WOMENS
RR
M
R
STG
57City of Newark Facilities Master Plan
MECH

DRAFT FOR INTERNAL USE ONLY

FACILITY CONDITION
INDEX
Current: 0.0%
5-year: 0.1%
10-year: 3.8%

FINANCE
Current = 11 staff

CITY MANAGER (CM)
Current = 16 staff, 2 part time
IT
Current = 6 staff
+2
+4
+1
EXISTING FLOOR PLAN CITY HALL 2ND FLOOR

FINANCE
Current = 11 staff

CITY MANAGER (CM)
Current = 16 staff, 2 part time
IT
Current = 6 staff

EXISTING FLOOR PLAN
Open office space with cubicles at David W.

Smith City Hall
Conference room on David W. Smith City
Hall's first floor
57City of Newark Facilities Master Plan
MECH

DRAFT FOR INTERNAL USE ONLY

FACILITY CONDITION
INDEX
Current: 0.0%
5-year: 0.1%
10-year: 3.8%

FINANCE
Current = 11 staff

CITY MANAGER (CM)
Current = 16 staff, 2 part time
IT
Current = 6 staff
+2
+4
+1
EXISTING FLOOR PLAN CITY HALL 2ND FLOOR
Packet Page No. 1485
53 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2023

3. ADMINISTRATION, PUBLIC SAFETY, & SERVICE FACILITIES

STAFF SURVEY RESULTS
To fully comprehend the existing space and needs of all facilities, staff and department head surveys were distributed. The purpose of these surveys was to collect information about both their department’s overall layout as well as their individual workspaces. The questions in the survey went into detail about what they liked about their current workspaces/ departments, what they would change, if their adjacencies were adequate, adequacy of storage, amount of noise, and more.

The general staff survey results summary for all departments can be found below and on the next few pages.

Packet Page No. 1486
54 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2024

3. ADMINISTRATION, PUBLIC SAFETY, & SERVICE FACILITIES
Packet Page No. 1487
55 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2023

3. ADMINISTRATION, PUBLIC SAFETY, & SERVICE FACILITIES
Packet Page No. 1488
56 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2024

3. ADMINISTRATION, PUBLIC SAFETY, & SERVICE FACILITIES
DAVID W. SMITH CITY HALL ADMINISTRATION NEEDS
As shown above, David W. Smith City Hall has several space needs that have been determined by examining staff survey results, conducting department head interviews, and completing a thorough walk-through of the work spaces.
▪ Workspace: Limited vacant workstations and offices for future staff growth ▪ Meeting Rooms: Meeting rooms have been reduced to accommodate for current office needs. Need for small focus/ zoom rooms
▪ Public Spaces: Public counters and lobbies are underutilized. Security concerns regarding current public counters.

Packet Page No. 1489
57 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2023

3. ADMINISTRATION, PUBLIC SAFETY, & SERVICE FACILITIES

PROGRAM OF SPACE NEEDS
With careful analysis of the existing facility layouts, staff surveys, and department head interviews, a space needs program for David W. Smith City Hall was developed.

The table below includes the David W. Smith City Hall’s existing space (square footage) and future space needs that projects out to 10 years in the future. This table was created and adjusted as needed through several iterations in interviews and PMT meetings.

NEWARK CITY HALL

BUILDING PROGRAM
SF USF/person USF/person
FTE Part Time
Seasonal FTE Part Time Seasonal FTE Part Time Seasonal

1. CITY COUNCIL, CITY MANAGER, CITY ATTORNEY, CITY CLERK & HR

1.01 Mayor 1 132 132

1.02 City Manager 1 251 251

1.03 Assistant City Manager 1 182 182

1.04 City Manager Staff 4 1 476 119 3

1.05 City Attorney 1 196 196

1.06 City Attorney Staff

1.07 City Clerk 1 129 129

1.08 City Clerk Staff

1.09 Human Resources Director 1 230 230

1.10 HR Staff 4 318 80
14 2 0 0 1913 120 3 0

2. INFORMATION TECHNOLOGY

2.01 Chief Information Officer/IT Director 1 175 175

2.02 IT Staff 5 400 80 2
6 0 0 0 575 96 2 0

3. FINANCE

3.01 Finance Director 1 183 183

3.02 Accounting Manager 1 135 135

3.03 Collections Staff 1 65 65

3.04 Cashier 1 65 65

3.05 Finance Staff 7 696 99 3
11 0 0 0 1144 104 3 0

4. COMMUNITY DEVELOPMENT

4.01 Community Development Director 1 196 196

4.02 Deputy Community Development Director 1 147 147

4.03 Community Development Staff 1 80 80 5

4.04 Economic Development Manager 1 147 147
Economic Development Staff 2 65 33

4.05 Community Preservation Manager 1 60 60

4.06 Community Preservation Staff 3 180 60

4.06 Senior Planner 1 90 90

4.07 Planning Staff 1 90 90
10 2 0 0 1055 88 5 0

5. PUBLIC WORKS

5.01 Public Works Director 1 196 196

5.02 Public Works Staff 2 160 80 5

5.03 Assistant City Engineer 1 147 147

5.04 Engineering Staff 8 688 86

5.05 Chief Building Official 1 170 170

5.06 Building Staff 8 455 57

5.07 Environmental Services Manager 1 113 113

5.08 Envrionmental Services Staff 0

5.09 Maintenance Superintendent 1 0

5.10 Assistant Maintenance Superintendent 1 0

5.11 Maintenance Staff 19 0

5.12 Building Manager 1

5.13 Fleet/Street Manager 1

5.14 Code Enforcement Manager 1 114 114
23 0 23 0 2133 93 5 0

6. FIRE

6.01 Fire Marshal 1 90 90

6.02 Fire Inspector 1 60 60

6.03 Fire Staff (Vacant) 1 90 90

6.04 Fire Inspector (vacant) 1 60 60
4 0 0 0 300 75 0 0
SUBTOTAL 68 4 23 0 7120 99 18 0 0

7. MEETING ROOMS & OTHER STAFF AMENITY SPACES

7.01 Chambers Conference 351

7.02 Meeting Room 2 230

7.03 Meeting Room 3 246

7.04 Meeting Room 4 291

7.05 Meeting Room 5 167

7.06 HR Conference Room 165

7.07 IS Work Room 190

7.08 Floor 1 Work Area 325

CURRENT SPACE FUTURE SPACE
Community Development Total :

City Council, City Manager, City Attorney, City Clerk &

CURRENT STAFF
Space City Hall Other Locations
Information Technology Total:

Finance Total:

Public Works Total:

Information Technology Total:

FUTURE STAFF
City Hall
DAVID W. SMITH CITY HALL
Packet Page No. 1490
58 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2024

3. ADMINISTRATION, PUBLIC SAFETY, & SERVICE FACILITIES
Department Office Space
Department office space: Currently, David W. Smith City Hall is operating with 99 square feet of office space per person. This number is calculated using the square footage of each office space and how many staff members occupy each space. Total office square footage is divided by total staff members. There are 68 fulltime employees that work at David W. Smith City Hall and 4 part-time. Some departments are more efficient with space than others, but the results of this study show that David W. Smith City Hall’s floor plan is slightly inefficient, with each department needing more space to accommodate future staff growth.

1.06 City Attorney Staff

1.07 City Clerk 1 129 129

1.08 City Clerk Staff

1.09 Human Resources Director 1 230 230

1.10 HR Staff 4 318 80
14 2 0 0 1913 120 3 0

2. INFORMATION TECHNOLOGY

2.01 Chief Information Officer/IT Director 1 175 175

2.02 IT Staff 5 400 80 2
6 0 0 0 575 96 2 0

3. FINANCE

3.01 Finance Director 1 183 183

3.02 Accounting Manager 1 135 135

3.03 Collections Staff 1 65 65

3.04 Cashier 1 65 65

3.05 Finance Staff 7 696 99 3
11 0 0 0 1144 104 3 0

4. COMMUNITY DEVELOPMENT

4.01 Community Development Director 1 196 196

4.02 Deputy Community Development Director 1 147 147

4.03 Community Development Staff 1 80 80 5

4.04 Economic Development Manager 1 147 147
Economic Development Staff 2 65 33

4.05 Community Preservation Manager 1 60 60

4.06 Community Preservation Staff 3 180 60

4.06 Senior Planner 1 90 90

4.07 Planning Staff 1 90 90
10 2 0 0 1055 88 5 0

5. PUBLIC WORKS

5.01 Public Works Director 1 196 196

5.02 Public Works Staff 2 160 80 5

5.03 Assistant City Engineer 1 147 147

5.04 Engineering Staff 8 688 86

5.05 Chief Building Official 1 170 170

5.06 Building Staff 8 455 57

5.07 Environmental Services Manager 1 113 113

5.08 Envrionmental Services Staff 0

5.09 Maintenance Superintendent 1 0

5.10 Assistant Maintenance Superintendent 1 0

5.11 Maintenance Staff 19 0

5.12 Building Manager 1

5.13 Fleet/Street Manager 1

5.14 Code Enforcement Manager 1 114 114
23 0 23 0 2133 93 5 0

6. FIRE

6.01 Fire Marshal 1 90 90

6.02 Fire Inspector 1 60 60

6.03 Fire Staff (Vacant) 1 90 90

6.04 Fire Inspector (vacant) 1 60 60
4 0 0 0 300 75 0 0
SUBTOTAL 68 4 23 0 7120 99 18 0 0

7. MEETING ROOMS & OTHER STAFF AMENITY SPACES

7.01 Chambers Conference 351

7.02 Meeting Room 2 230

7.03 Meeting Room 3 246

7.04 Meeting Room 4 291

7.05 Meeting Room 5 167

7.06 HR Conference Room 165

7.07 IS Work Room 190

7.08 Floor 1 Work Area 325

7.09 Finance Storage/ Work Room 240

7.1 HR Work Area 69

7.11 Floor 2 Work Room 245

7.12 HR Finger Print 100

7.13 Break Room 415

7.14 Coffee Area 77

7.15 Lactation Room 60

7.16 Council Chambers 2032
5,202.81

8. STORAGE & OTHER NON ASSIGNABLE AREAS

8.01 Chair Storage 100

8.02 Chambers AV Closet 41

8.03 Clerk Files 131

8.04 HR Files 150

8.05 Cashier Files 80

8.06 Copy Room 1 77

8.07 First Floor Restrooms 806

8.08 Second Floor Restrooms 496

8.09 First Floor Building Support (Mech, Elec, etc.) 431

8.1 Second Floor Building Support (Mech, Elec, etc.) 280

8.11 Floor 1 Circulation 6,632
812 Fl2 Cilti
3225
Community Development Total :

City Council, City Manager, City Attorney, City Clerk & Information Technology Total:

Finance Total:

Public Works Total:

Meeting Rooms and Other Staff Amenity Spaces Total :

Information Technology Total:

NEWARK CITY HALL

BUILDING PROGRAM
SF USF/person USF/person
FTE Part Time
Seasonal FTE Part Time Seasonal FTE Part Time Seasonal

1. CITY COUNCIL, CITY MANAGER, CITY ATTORNEY, CITY CLERK & HR

1.01 Mayor 1 132 132

1.02 City Manager 1 251 251

1.03 Assistant City Manager 1 182 182

1.04 City Manager Staff 4 1 476 119 3

1.05 City Attorney 1 196 196

1.06 City Attorney Staff

1.07 City Clerk 1 129 129

1.08 City Clerk Staff

1.09 Human Resources Director 1 230 230

1.10 HR Staff 4 318 80
14 2 0 0 1913 120 3 0

2. INFORMATION TECHNOLOGY

2.01 Chief Information Officer/IT Director 1 175 175

2.02 IT Staff 5 400 80 2
6 0 0 0 575 96 2 0

3. FINANCE

3.01 Finance Director 1 183 183

3.02 Accounting Manager 1 135 135

3.03 Collections Staff 1 65 65

3.04 Cashier 1 65 65

3.05 Finance Staff 7 696 99 3
11 0 0 0 1144 104 3 0

4. COMMUNITY DEVELOPMENT

4.01 Community Development Director 1 196 196

4.02 Deputy Community Development Director 1 147 147

4.03 Community Development Staff 1 80 80 5

4.04 Economic Development Manager 1 147 147
Economic Development Staff 2 65 33

4.05 Community Preservation Manager 1 60 60

4.06 Community Preservation Staff 3 180 60

4.06 Senior Planner 1 90 90

4.07 Planning Staff 1 90 90
10 2 0 0 1055 88 5 0

5. PUBLIC WORKS

5.01 Public Works Director 1 196 196

5.02 Public Works Staff 2 160 80 5

5.03 Assistant City Engineer 1 147 147

5.04 Engineering Staff 8 688 86

5.05 Chief Building Official 1 170 170

5.06 Building Staff 8 455 57

5.07 Environmental Services Manager 1 113 113

5.08 Envrionmental Services Staff 0

5.09 Maintenance Superintendent 1 0

5.10 Assistant Maintenance Superintendent 1 0

5.11 Maintenance Staff 19 0

5.12 Building Manager 1

5.13 Fleet/Street Manager 1

5.14 Code Enforcement Manager 1 114 114
23 0 23 0 2133 93 5 0

6. FIRE

6.01 Fire Marshal 1 90 90

6.02 Fire Inspector 1 60 60

6.03 Fire Staff (Vacant) 1 90 90

6.04 Fire Inspector (vacant) 1 60 60
4 0 0 0 300 75 0 0
SUBTOTAL 68 4 23 0 7120 99 18 0 0

7. MEETING ROOMS & OTHER STAFF AMENITY SPACES

7.01 Chambers Conference 351

7.02 Meeting Room 2 230

7.03 Meeting Room 3 246

7.04 Meeting Room 4 291

7.05 Meeting Room 5 167

7.06 HR Conference Room 165

7.07 IS Work Room 190

7.08 Floor 1 Work Area 325

7.09 Finance Storage/ Work Room 240

7.1 HR Work Area 69

7.11 Floor 2 Work Room 245

7.12 HR Finger Print 100

CURRENT SPACE FUTURE SPACE
Community Development Total :

City Council, City Manager, City Attorney, City Clerk &

CURRENT STAFF
Space City Hall Other Locations
Information Technology Total:

Finance Total:

Public Works Total:

Information Technology Total:

FUTURE STAFF
City Hall
DAVID W. SMITH CITY HALL
Packet Page No. 1491
59 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2023

3. ADMINISTRATION, PUBLIC SAFETY, & SERVICE FACILITIES
Staff Growth
18 future staff are projected to be added to David W. Smith City Hall over the next 10 years. During interviews conducted to determine needs and future growth, each department head identified future staff additions, if any.

5.13 Fleet/Street Manager 1

5.14 Code Enforcement Manager 1 114 114
23 0 23 0 2133 93 5 0

6. FIRE

6.01 Fire Marshal 1 90 90

6.02 Fire Inspector 1 60 60

6.03 Fire Staff (Vacant) 1 90 90

6.04 Fire Inspector (vacant) 1 60 60
4 0 0 0 300 75 0 0
SUBTOTAL 68 4 23 0 7120 99 18 0 0

7. MEETING ROOMS & OTHER STAFF AMENITY SPACES

7.01 Chambers Conference 351

7.02 Meeting Room 2 230

7.03 Meeting Room 3 246

7.04 Meeting Room 4 291

7.05 Meeting Room 5 167

7.06 HR Conference Room 165

7.07 IS Work Room 190

7.08 Floor 1 Work Area 325

7.09 Finance Storage/ Work Room 240

7.1 HR Work Area 69

7.11 Floor 2 Work Room 245

7.12 HR Finger Print 100

7.13 Break Room 415

7.14 Coffee Area 77

7.15 Lactation Room 60

7.16 Council Chambers 2032
5,202.81

8. STORAGE & OTHER NON ASSIGNABLE AREAS

8.01 Chair Storage 100

8.02 Chambers AV Closet 41

8.03 Clerk Files 131

8.04 HR Files 150

8.05 Cashier Files 80

8.06 Copy Room 1 77

8.07 First Floor Restrooms 806

8.08 Second Floor Restrooms 496

8.09 First Floor Building Support (Mech, Elec, etc.) 431

8.1 Second Floor Building Support (Mech, Elec, etc.) 280

8.11 Floor 1 Circulation 6,632

8.12 Floor 2 Circulation 3,225
12,449
GRANDTOTAL 64 4 23 0 24,772 364 18 0 0
Storage and Other NonAssignable Area Total :

Public Works Total:

Meeting Rooms and Other Staff Amenity Spaces Total :

Information Technology Total:

NEWARK CITY HALL

BUILDING PROGRAM
SF USF/person USF/person
FTE Part Time
Seasonal FTE Part Time Seasonal FTE Part Time Seasonal

1. CITY COUNCIL, CITY MANAGER, CITY ATTORNEY, CITY CLERK & HR

1.01 Mayor 1 132 132

1.02 City Manager 1 251 251

1.03 Assistant City Manager 1 182 182

1.04 City Manager Staff 4 1 476 119 3

1.05 City Attorney 1 196 196

1.06 City Attorney Staff

1.07 City Clerk 1 129 129

1.08 City Clerk Staff

1.09 Human Resources Director 1 230 230

1.10 HR Staff 4 318 80
14 2 0 0 1913 120 3 0

2. INFORMATION TECHNOLOGY

2.01 Chief Information Officer/IT Director 1 175 175

2.02 IT Staff 5 400 80 2
6 0 0 0 575 96 2 0

3. FINANCE

3.01 Finance Director 1 183 183

3.02 Accounting Manager 1 135 135

3.03 Collections Staff 1 65 65

3.04 Cashier 1 65 65

3.05 Finance Staff 7 696 99 3
11 0 0 0 1144 104 3 0

4. COMMUNITY DEVELOPMENT

4.01 Community Development Director 1 196 196

4.02 Deputy Community Development Director 1 147 147

4.03 Community Development Staff 1 80 80 5

4.04 Economic Development Manager 1 147 147
Economic Development Staff 2 65 33

4.05 Community Preservation Manager 1 60 60

4.06 Community Preservation Staff 3 180 60

4.06 Senior Planner 1 90 90

4.07 Planning Staff 1 90 90
10 2 0 0 1055 88 5 0

5. PUBLIC WORKS

5.01 Public Works Director 1 196 196

5.02 Public Works Staff 2 160 80 5

5.03 Assistant City Engineer 1 147 147

5.04 Engineering Staff 8 688 86

5.05 Chief Building Official 1 170 170

5.06 Building Staff 8 455 57

5.07 Environmental Services Manager 1 113 113

5.08 Envrionmental Services Staff 0

5.09 Maintenance Superintendent 1 0

5.10 Assistant Maintenance Superintendent 1 0

5.11 Maintenance Staff 19 0

5.12 Building Manager 1

5.13 Fleet/Street Manager 1

5.14 Code Enforcement Manager 1 114 114
23 0 23 0 2133 93 5 0

6. FIRE

6.01 Fire Marshal 1 90 90

6.02 Fire Inspector 1 60 60

6.03 Fire Staff (Vacant) 1 90 90

6.04 Fire Inspector (vacant) 1 60 60
4 0 0 0 300 75 0 0
SUBTOTAL 68 4 23 0 7120 99 18 0 0

7. MEETING ROOMS & OTHER STAFF AMENITY SPACES

7.01 Chambers Conference 351

7.02 Meeting Room 2 230

7.03 Meeting Room 3 246

7.04 Meeting Room 4 291

7.05 Meeting Room 5 167

7.06 HR Conference Room 165

7.07 IS Work Room 190

7.08 Floor 1 Work Area 325

7.09 Finance Storage/ Work Room 240

7.1 HR Work Area 69

7.11 Floor 2 Work Room 245

7.12 HR Finger Print 100

CURRENT SPACE FUTURE SPACE
Community Development Total :

City Council, City Manager, City Attorney, City Clerk &

CURRENT STAFF
Space City Hall Other Locations
Information Technology Total:

Finance Total:

Public Works Total:

Information Technology Total:

FUTURE STAFF
City Hall
DAVID W. SMITH CITY HALL
Packet Page No. 1492
60 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2024

3. ADMINISTRATION, PUBLIC SAFETY, & SERVICE FACILITIES

SPACE UTILIZATION
Through calculating current space usage, the space allocation for David W. Smith City Hall was determined and is shown below in percentages. This calculation shows that the layout and current space allocation is slightly inefficient, with 29% percent used for circulation while 20-25% is the average. With some carefully rework of public lobbies and service desks, there could be some shift to increase office space to accommodate future staff growth.

City staff noted a lack of storage in the David W. Smith City Hall workspaces throughout the planning process, though in-person assessment and space utilization analyses concluded that existing storage is not efficiently used and could be reorganized to better handle staff storage needs.
52City of Newark FMP 10/13/2023

CURRENT CITY HALL SPACE UTILIZATION DRAFT
34% 14% 2% 11% 10% 29%

OFFICE SPACE MEETING/

CONF ROOM
NONASSIGNABLEAMENITIES LOBBY &

GATHERING

CIRCULATION
Current Space Utilization
72 Current Staff, 25,000 SF City Hall
Total SF/ person: 347
90 Future Staff, 25,000 SF City Hall
Total SF/person: 278
29% Circulation Factor:
indicates a slightly
inefficient space plan,
planning standards is
20-25%.

I/OWNED 34% OF AREA WE/SHARED 16% WE/SHARED 50%
39-44% 14% 2% 10% 10% 20-25%

OFFICE SPACE MEETING/

CONF ROOM
NONASSIGNABLEAMENITIES LOBBY &

GATHERING

CIRCULATION
Future Space Utilization
I/OWNED 39-44% OF AREA WE/SHARED 16% NON-OCCUPIABLE 40-45% David W. Smith City Hall
David W. Smith City Hall
Packet Page No. 1493
61 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2023

3. ADMINISTRATION, PUBLIC SAFETY, & SERVICE FACILITIES
Packet Page No. 1494
62 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2024

3. ADMINISTRATION, PUBLIC SAFETY, & SERVICE FACILITIES
RECOMMENDATION: REPLACE
FIRE STATION 27
Address: 3909 Cherry Street, Newark,
CA 94560
Built: 1981
Size: 6,000 square feet
Site Area: 1.2 acres
Estimated Project Costs:

New 8,000 SF Station: $15,801,000
New 10,000 SF Station: $19,655,000
YEAR FCI (Facility Condition Index)
Current 8.8%
3-Year 10.2%
5-Year 12.8%
10-Year 25.2%
Packet Page No. 1495
63 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2023

3. ADMINISTRATION, PUBLIC SAFETY, & SERVICE FACILITIES
RECOMMENDATION: REPLACE
FIRE STATION 29
Address: 35775 Ruschin Drive, Newark,
CA 94560
Built: 1962
Size: 5,200 square feet
Site Area: 0.58 acres
Estimated Project Costs:

New 8,000 SF Station: $15,801,000
New 10,000 SF Station: $19,655,000
YEAR FCI (Facility Condition Index)
Current 5.5%
3-Year 7.7%
5-Year 11.7%
10-Year 19.8%
Packet Page No. 1496
64 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2024

3. ADMINISTRATION, PUBLIC SAFETY, & SERVICE FACILITIES
FIRE STATION 27 EXISTING CONDITIONS
The Newark Fire Station 27 was built in 1981 on a corner lot located at Mowry Avenue and Cherry Street. The one-story station is approximately 6,000 SF and sited on a 1.38 acre site. The three-story fire training tower was constructed in 1982.

The fire station accommodates a single engine company, which is staffed with three fire personnel. The apparatus bays were expanded to accommodate longer fire apparatus and the one large dormitory room was divided into semiprivate sleeping areas with partial height walls.

The wood framed building is finished on the exterior, cement plaster on the walls, and metal mansard roof framing around the building perimeter. There is low sloped roof framing and foam roofing material behind the mansards to accommodate mechanical equipment.

The existing station comprised of two apparatus bays, which is also used as the decontamination clean up, turnout gear storage space and exercise space. All these functions are required to have separate ventilated spaces to be code compliant with the National Fire Protection Association (NFPA) and OSHA.

The living quarters is a combined kitchen, dayroom and dining room space with separate locker room for personal gear and one restroom. The sleeping quarters are one large space that has been subdivided. The main public entrance to the fire station opens into a small lobby and reception area. There is no dedicated Fire Captain’s office or Firefighter work area for report writing.

The existing site is not secured along the entire perimeter of the site. There is adequate parking for fire personnel, but no dedicated parking for the public or accommodation for accessibility. The fire station is immediately adjacent to the Newark Skate Park, Sports Field Park and close to the Silliman Activity and Family Aquatic Center.

FIRE STATION 27 – SITE NEEDS
FIRE OPERATIONS ISSUES:

1. Need to repair
intersection pre-empt
signage

2. Need site security with
perimeter fencing and
gates

ESSENTIAL SERVICES ACT
COMPLIANCE ISSUES:

3. Need emergency backup power for entire
station

4. Need seismic
strengthening for entire
station

CODE COMPLIANCE
ISSUES:

5. Need to divert truck
washing to sewer

6. Need to repair leaks at
exterior wall and doors
5 1
2 2
3 4
6 Packet Page No. 1497
65 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2023

3. ADMINISTRATION, PUBLIC SAFETY, & SERVICE FACILITIES
FIRE STATION 29 EXISTING CONDITIONS
Newark Fire Station 29 was built in 1962 and is located on the corner of Newark Blvd. and Dalewood Drive. The one-story station is approximately 5,142 SF and sited on a 0.58-acre site. The station was renovated and expanded in 1975 to accommodate individual bunk rooms and restrooms with showers and lockers.

The exterior walls are load bearing stack bond concrete masonry block with aluminum framed windows and doors. The roof framing is pitched and is covered with lightweight concrete tiles. There are several areas of dry rot, insect and water damage to the roof eaves and facias.

The fire station accommodates a single engine company, which is staffed with three fire personnel. The apparatus bays were not expanded to accommodate longer fire apparatus as originally planned. The existing station is comprised of two drive through apparatus bays, which are also used as the decontamination clean up and turnout gear storage space. All these functions are required to have separate ventilated spaces to be code compliant with the NFPA and OSHA.

The living quarters is a combined kitchen, dayroom and dining room space. There is a dedicated exercise space. The sleeping quarters is one large space that has been subdivided into semi private sleeping areas with partial height walls. The main public entrance to the fire station opens onto the watch room and reception area. There are dedicated Fire Captain’s office and Firefighter work area for report writing.

The existing site is not secured along the entire perimeter. There is adequate parking for fire personnel, but no dedicated parking for the public or accommodation for accessibility. The fire station is immediately adjacent to single family residential neighborhoods. Newark Junior High School, Newark Community Center Park and NewBark Dog Park are in close proximity.
72City of Newark Facilities Master Plan
ATION 29 – SITE NEEDS
3 3
2 1
1 SUES:
with
and
one
und
es over
f
ACT
S:
back
e
entire
E
ck
4 5
6 FIRE STATION 29
FIRE OPERATIONS ISSUES:

1. Need site security with
perimeter fencing and
gates

2. Need to repair phone
line

3. Need to underground
existing power lines over
emergency path of
response

ESSENTIAL SERVICES ACT
COMPLIANCE ISSUES:

4. Need emergency backup power for entire
station

5. Need seismic
strengthening for entire
station

CODE COMPLIANCE
ISSUES:

6. Need to divert truck
washing to sewer
Packet Page No. 1498
66 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2024

3. ADMINISTRATION, PUBLIC SAFETY, & SERVICE FACILITIES
32City of Newark Facilities Master Plan
FIRE STATION OPTIONS FIRE STATION 27 & 29
FIRE STATION #27 FIRE STATION #29
31City of Newark Facilities Master Plan

FIRE STATION NEEDS

CODE COMPLIANCE
ISSUES
Current facilities do not meet
current ADA as well as other
compliance issues with
egress and ventilation.

FIRE STATION 27 & 29

ESSENTIAL SERVICE ACT

COMPLIANCE ISSUES
Both facilities need seismic
strengthening and
emergency back-up power.

OPERATIONS
Improvements to bring
facilities up to current best
practices for fire operations
and security.
#27
#29

LIFE SAFETY ISSUES
Current facilities need fire
alarm systems.

Packet Page No. 1499
67 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2023

3. ADMINISTRATION, PUBLIC SAFETY, & SERVICE FACILITIES
FIRE STATION 27 & 29 NEEDS
As shown by the facility condition index numbers on pages 62 and 63, Fire Stations 27 and 29 are in need of major improvements projects. Both of the stations have a vast amount of deferred maintenance needs that include code compliance, life safety, and operational shortcomings. Both facilities were constructed several decades ago in the 1960s and 80s, and do not reflect modern fire safety standards. Listed below are the overall needs for both facilities. Facility-specific information can be found on pages 64 and 65.
▪ Essential Service Act Compliance: Both facilities need seismic strengthening and emergency back-up power.
▪ Code Compliance Issues: Current facilities to not meet current ADA as well as other compliance issues with egress and ventilation.
▪ Life Safety Issues: Current facilities need fire alarm systems. ▪ Operations: Improvements are needed to bring facilities up to current best practices for fire operations and security.

Packet Page No. 1500
68 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2024

3. ADMINISTRATION, PUBLIC SAFETY, & SERVICE FACILITIES
RECOMMENDATION: MAINTAIN
FIRE STATION 28
Address: 7550 Thornton Avenue,
Newark, CA 94560
Built: 2005
Size: 18,000 square feet
Site Area: 1.12 acres
Estimated Project Costs:

Station 28 Improvements: $2,060,000
YEAR FCI (Facility Condition Index)
Current 0.4%
3-Year 1.2%
5-Year 3.2%
10-Year 9.5%
Packet Page No. 1501
69 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2023

3. ADMINISTRATION, PUBLIC SAFETY, & SERVICE FACILITIES
FIRE STATION 28 EXISTING CONDITIONS
Newark Fire Station 28 was built in 2005 and is located on the corner of Thornton Avenue and Ash Street. The two-story facility is approximately 18,000 square feet which includes a storage loft and walk in attic space. The site is approximately 1.12 acres and has secured parking for fire personnel and an ancillary building, which houses the emergency generator and fuel tank. Renovation to the mechanical system occurred in 2015, but no expansion to the facility was needed.

The existing fire station is constructed with concrete masonry block bearing walls on the first floor and second floors that are clad with traditional detailed face brick and has decorative cast stone features emphasizing the apparatus bays, window heads and sills and along the roof line. The roof assembly is comprised of a pitched metal roofing with traditionally detailed stepped parapet end walls with stone parapet caps.

The fire station accommodates a single engine company, which is staffed with three fire personnel and a Battalion Chief. There are three drive thru apparatus bays with dedicated spaces for medical storage, the self-contained breathing apparatus (SCBA) compressor, work shop, and decontamination clean-up. Though this is a relatively new station, the turnout gear is stored along the apparatus bay walls. Per code the turnout gear should be stored in a separate ventilated space to be code compliant with the NFPA and OSHA.

There is a main public entrance and dedicated lobby, reception area and accessible restroom. The administrative spaces include a conference room, work area for firefighters, and offices for the Fire Captain and Battalion Chief.

The living and sleeping quarters are on the second floor with an open concept kitchen, dayroom and dining room space, individual bunk rooms, gender specific restrooms, exercise room and a large roof patio space.

The existing site is secured along the entire perimeter with metal fencing. There is adequate parking for fire personnel and on street parking for public visitors, which accommodates accessibility. The fire station is immediately adjacent to railroad tracks, single family residences, and commercial businesses.
69City of Newark Facilities Master Plan
ATION 28 – SITE NEEDS
S
ve gate

CES ACT
UES:
se
nerator
ystems
ovide
wer for
ty
1 FIRE STATION 28

FIRE OPERATIONS
ISSUES:

1. Need to improve gate
opening speed

ESSENTIAL SERVICES ACT
COMPLIANCE ISSUES:

2. Need to increase
emergency generator
and fuel tank systems
capacity to provide
emergency power for
the entire facility
Packet Page No. 1502
70 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2024

3. ADMINISTRATION, PUBLIC SAFETY, & SERVICE FACILITIES
33City of Newark Facilities Master Plan
FIRE STATION NEEDS FIRE STATION 28

INTERIOR
Minor interior improvements
to improve life safety, code
compliance, operations and
security issues.

EXTERIOR
Improvements to site security
and operations.

ESSENTIAL SERVICE ACT

COMPLIANCE
Increase emergency power
capacity for the entire facility
and systems.

FIRE STATION 28 NEEDS
Fire Station 28 is in good condition as shown by the Facility Condition Index numbers on page 68. In order to keep the building maintained, these following needs should be addressed:
▪ Essential Service Act Compliance: Increase emergency power capacity for the entire facility and systems
▪ Interior: Minor interior improvements to improve life safety, code compliance, operations, and security issues
▪ Exterior: Improvements to site security and operations Packet Page No. 1503
71 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2023

3. ADMINISTRATION, PUBLIC SAFETY, & SERVICE FACILITIES
Packet Page No. 1504
72 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2024

3. ADMINISTRATION, PUBLIC SAFETY, & SERVICE FACILITIES
RECOMMENDATION: MAINTAIN

NEWARK POLICE DEPARTMENT
Address: 37077 Newark Boulevard,
Newark, CA 94560
Built: 2020
Size: 24,000 square feet
Site Area: 1.76 acres
Estimated Project Costs:

Police Station Improvements: $2,223,000
YEAR FCI (Facility Condition Index)
Current 0.1%
3-Year 0.1%
5-Year 0.1%
10-Year 3.5%
Packet Page No. 1505
73 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2023

3. ADMINISTRATION, PUBLIC SAFETY, & SERVICE FACILITIES

NEWARK POLICE DEPARTMENT EXISTING CONDITIONS
The Newark Police Department was built in 2020 along with the Alan L. Nagy Library and the David W. Smith City Hall as part of the Civic Center campus. The building sits on 1.76 acres and has one story of 24,000 square feet. The central location of the Newark Civic Center gives officers easy access to the Newark community and additionally connects the building to the plaza between the Alan L. Nagy Library and David W. Smith City Hall where community events often take place. The building’s public parking is shared with the Newark Civic Center and has secured police car parking as well.

The building is modern and features a large, light-filled public lobby and service desk.

Beyond the lobby, there is a large training room, open and individual office spaces, evidence storage, men’s and women’s locker rooms, and other detective and interview spaces. Observations are listed below:
▪ New building that serves the Newark community well
▪ Lobby and entryway acoustics: noise carries
▪ Ballistics and glazing need to be repaired
▪ Armory could use second tier security
▪ Patrol space lacks visual and acoustical control
▪ Red light analyst and dispatch supervisor share office 63City of Newark Facilities Master Plan
POLICE HQ STATION – BUILDING NEEDS

DRAFT FOR INTERNAL USE ONLY

3. Repair ballistics
glazing and add
visual control at high
windows

4. Relocate live scan
into a room

5. Repurpose existing
interview room to soft
interview room and
sleeping room

6. Add door for second
tier security at armory

1. Bad acoustics in lobby/
entrance

2. Reallocate existing
sleeping room to court
zoom room

9. Reallocate office
spaces to provide
separate offices for
the red light analyst
and dispatch
supervisor

7. Complete visual
surveillance and
access control systems

8. Add door at patrol for
visual and acoustical
control
5 1
2 3
6 4
7 8
9 Packet Page No. 1506
74 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2024

3. ADMINISTRATION, PUBLIC SAFETY, & SERVICE FACILITIES
30City of Newark Facilities Master Plan

PUBLIC SAFETY NEEDS

INTERIOR
Minor interior improvements
to improve operations and
security.

POLICE STATION

EXTERIOR
• Improvements to site security,
vehicle charging capacity
and operations.
• Improve roof and storm
drainage and waterproofing
issues.

NEWARK POLICE DEPARTMENT NEEDS
Because the Newark Police Department was built only four years ago, it is operating well and remains a new, modern, effective building. In order to maintain the building well into the future, some minor improvements could be made within the next few years:
▪ Interior: Minor interior projects to improve operations and security ▪ Exterior: Improvements to site security, vehicle charcing capacity and operations as well as improving roof and storm drainage and waterproofing issues Packet Page No. 1507
75 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2023

3. ADMINISTRATION, PUBLIC SAFETY, & SERVICE FACILITIES
Packet Page No. 1508
76 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2024

3. ADMINISTRATION, PUBLIC SAFETY, & SERVICE FACILITIES
RECOMMENDATION: RENOVATE

NEWARK SERVICE CENTER
Address: 37440 Filbert Street, Newark,
CA 94560
Built: 1965-1988
Size: 40,000 square feet total (multiple
buildings)
Site Area: 4.9 acres
Estimated Project Costs:

Service Center Improvements:
$13,016,000
YEAR FCI (Facility Condition Index)
Current 4.0%
3-Year 8.5%
5-Year 14.0%
10-Year 24.7%
Packet Page No. 1509
77 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2023

3. ADMINISTRATION, PUBLIC SAFETY, & SERVICE FACILITIES

NEWARK SERVICE CENTER EXISTING CONDITIONS
Located on Filbert Street, the Newark Service Center sits across from the existing Clark W. Redeker Senior Center. There are seven buildings included on the site that were all developed between the years of 1965 and 1988. The seven buildings total just under 40,000 square feet. One of the seven buildings is used for Maintenance administration staff offices and is 2,400 square feet. Newark Service Center observations are listed below.

Administration Building
▪ Office space is not efficiently laid out.
▪ Portable facility that is outdated and small.

Lockers and Break Room
▪ Both genders' lockers are located within the open training/ lunchroom, meaning that staff are changing in the open area. A room divider exists but does not work anymore.

Building Shop and Maintenance Bays
▪ Shop does not have HVAC/ proper air circulation.
▪ Maintenance bays cannot fully accommodate fleet size; fire engines do not fit well.

Covered Parking and Security
▪ The back corners of the Newark Service Center are sometimes used as illegal entry points to the facility; facility security is not adequate. ▪ Not enough coverage for parking needs.

Identified needs at Newark Service Center
Packet Page No. 1510
78 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2024

3. ADMINISTRATION, PUBLIC SAFETY, & SERVICE FACILITIES
RECOMMENDATION: MAINTAIN

SECOND CHANCE

EMERGENCY SHELTER
Built: 1960
Size: 3,200 square feet
Site Area: 0.51 acres
YEAR FCI (Facility Condition Index)
Current 0.7%
3-Year 2.7%
5-Year 6.6%
10-Year 22.6%
Packet Page No. 1511
79 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2023

3. ADMINISTRATION, PUBLIC SAFETY, & SERVICE FACILITIES
RECOMMENDATION: SELL, REPURPOSE, OR DEMOLISH

OLD FIRE STATION (VACANT)
Address: 7700 Thornton Avenue,
Newark, CA 94560
Built: 1980
Size: 4,900 square feet
Site Area: 0.37 acre
YEAR FCI (Facility Condition Index)
Current 13.1%
3-Year 13.5%
5-Year 21.6%
10-Year 27.1%
Packet Page No. 1512
80 CITY OF NEWARK FACILITIES MASTER PLAN
PMT REV I EW DRAFT 07/08/2024

3. ADMINISTRATION, PUBLIC SAFETY, & SERVICE FACILITIES
Packet Page No. 1513

CITY OF NEWARK

FACILITIES MASTER PLAN

CITY COUNCIL UPDATE
SEPTEMBER 12, 2024
Packet Page No. 1514
AGENDA
2 1. Project Goals and Schedule

2. Facility Conditions Assessment

3. Space Needs
 Community Buildings
 Fire Station 27 & 29

4. Implementation Plan
Packet Page No. 1515
3City of Newark Facilities Master Plan

PROJECT GOALS
making about programs, services, workflow, and
facilities

1. ASSESS | Assess facility needs & conditions

2. DETERMINE GROWTH |
Determine growth and future needs

3. ENGAGE | Engage the Newark community about community program and space needs

4. DEVELOP |Develop recommendations and options with supporting cost estimates

5. PLAN | Create an action plan to guide and improve future decision Packet Page No. 1516
City of Newark Facilities Master Plan
Packet Page No. 1517
4 AGENDA
5 1. Project Goals and Schedule

2. Facility Conditions Assessment

3. Space Needs
 Community Buildings
 Fire Station 27 & 29

4. Implementation Plan
Packet Page No. 1518
City of Newark Facilities Master Plan

NEWARK FACILITIES MAP
6 SPORTSFIELD RESTROOM
Packet Page No. 1519
7City of Newark Facilities Master Plan

FACILITY CONDITION ASSESSMENTS

PRE-SURVEY
• Pre-Survey
Questionnaire
• Review Existing
Data
PILOT
• Conduct Site
Assessment(s)
• Sample Report
• Draft Approval
01 02

ASSESSMENT
Building System
Inspections
• Site & Infrastructure
• Exterior & Bldg. Envelope
• Roof & Rooftop Systems
• Interiors & Accessibility
• MEP & Life Safety Systems
Identification of
Deficiencies
Inventory of Assets
Repair/Replace
Recommendation
Cost Estimating/
Maintenance Plan
03 DELIVERABLE
• Facility
Assessments
• Capital Planning
Reports
• Portfolio
Prioritization
• Facility Condition
Index (FCI)
04 Packet Page No. 1520
City of Newark Facilities Master Plan

FACILITY MAINTENANCE COSTS
8 Immediate Short Term
(1-2 yrs.)
Near Term
(3-5 yrs.)
Mid Term
(6-10 yrs.)
Long Term
(11-20 yrs.)
TOTAL
Total expenditures for ALL
facilities
$8.15M $4.08M $9.93M $20.41M $57.53M $100.1M
Total expenditures for ALL
facilities for Safety Plan
Type costs
$500K
Total expenditures for facilities
EXCLUDING Community Center
-Annex-Restroom, Fire Station
27 and 29, Watkins Hall, Old
Fire Station and Old Library
$1.72M $2.74M $7.38M $15.63M $44.99M $72.46M
Total expenditures for facilities
for Safety Plan Type costs
EXCLUDING Community Center
-Annex-Restroom, Fire Station
27 and 29, Watkins Hall, Old
Fire Station and Old Library
$52K
Packet Page No. 1521
City of Newark Facilities Master Plan

FACILITY RECOMMENDATION

FACILITY MAINTAIN RENOVATE REPLACE SELL/REPURPOSE/DEMO
Ash Street Park Bldgs
Birch Grove Restroom
Boathouse
Newark Community Center
Annex
Newark Community Center
Newark Community Center RR
Fire Station 27
Fire Station 28
Fire Station 29
Old Fire Station
Old Library
Clark W. Redeker Senior Center
Second Chance Shelter
Newark Service Center
George M. Silliman Center
Sports Field Restroom
Watkins Hall
David W. Smith City Hall
Alan L. Nagy Library
Newark Police Department
BASED ON 5-YEAR FCI

INDICATE SHORT TERM NEEDS
Packet Page No. 1522
9 AGENDA
10 1. Project Goals and Schedule

2. Facility Conditions Assessment

3. Space Needs
 Community Buildings
 Fire Stations 27 & 29

4. Implementation Plan
Packet Page No. 1523
City of Newark Facilities Master Plan

NEWARK COMMUNITY, RECREATION & AQUATIC FACILITIES
Packet Page No. 1524
11 City of Newark Facilities Master Plan
ROUND 1 COMMUNITY NEEDS ENGAGEMENT RESULTS
Packet Page No. 1525
12 City of Newark Facilities Master Plan

COMMUNITY PROGRAM

OPTIONS
Packet Page No. 1526
13 City of Newark Facilities Master Plan
ROUND 2 COMMUNITY NEEDS ENGAGEMENT RESULTS
74%
26%
0 50 100 150 200 250 300 350 400 450

NEWARK COMMUNITY PARK

NEWARK CIVIC CENTER PARK
NUMBER OF PARTICIPANTS = 526
Newark Days 9/17
Community Mtg 10/17
Tree Lighting 12/01
Online Survey
Packet Page No. 1527
14 City of Newark Facilities Master Plan

COMMUNITY PARK OPTIONS
OPTION A OPTION B1 (one-story) OPTION C
OPTION B2 (two-story)
Packet Page No. 1528
15 City of Newark Facilities Master Plan

NEWARK ADMINISTRATION, PUBLIC SAFETY & SERVICE FACILITIES Packet Page No. 1529
16 City of Newark Facilities Master Plan

FIRE STATION NEEDS

CODE COMPLIANCE
ISSUES
Current facilities do not
meet current ADA as well as
other compliance issues
with egress and ventilation.

FIRE STATION 27 & 29

ESSENTIAL SERVICE ACT

COMPLIANCE ISSUES
Both facilities need
seismic strengthening and
emergency back-up power.

OPERATIONS
Improvements to bring
facilities up to current best
practices for fire operations
and security.
#27
17 #29

LIFE SAFETY ISSUES
Current facilities need
fire alarm systems.

Packet Page No. 1530
City of Newark Facilities Master Plan
FIRE STATION OPTIONS FIRE STATION 27 & 29
FIRE STATION #27 FIRE STATION #29
Packet Page No. 1531
18 AGENDA
19 1. Project Goals and Schedule

2. Facility Conditions Assessment

3. Space Needs
 Community Buildings
 Fire Stations 27 & 29

4. Implementation Plan
Packet Page No. 1532
City of Newark Facilities Master Plan

FACILITY IMPROVEMENT PROJECTS
Project Costs Immediate &
Short Term
Near Term
(3-5 yrs.)
Mid Term (6-
10 yrs.)
Long Term
(11-20 yrs.)
AQUATICS Improvement to Silliman Center
• Updated pool amenities
• Improve Check-in and Staff Workspaces
• Ninja Cross and Aquatic Fitness
$7-9M
($5-6M)
($1-1.5M)
($1-1.5M)

COMMUNITY
& ARTS
New 18-32k SF Community & Arts Center @
Community Park
$31-56M
RECREATION Improvement to Silliman Center
• Improved Storage
• Evaluate underutilized space for additional
program opportunities
• Evaluate additional gym and courts
w/indoor walk/run track
$3-4M
$23-28M
CITY HALL Minor improvements to City Hall $1.5-2M

SERVICE
CENTER
Improvements to Service Center
• New Admin Building
• New maintenance bays (4)
• Update locker/changing rooms and break
room
• Update HVAC in Shop Bldg.
• Additional covered parking
$18.5-23M
($3-4M)
($7-8M)
($2-3M)
($.5-1M)
($6-7M)
FIRE New ~ 8k SF Fire Station 27
New ~ 8k SF Fire Station 29
Upgrades to Fire Station 28
$15-19M
$15-19M
$1.5-2M
POLICE Minor improvement to Police $2-2.5M
SAFETY ISSUES $52-500K
MAINTENANCE $4.5-

12.3M
$7.4-10M $15.7-

20.5M
$45-
Packet Page No. 1533

57.6M 20
THANK YOU!
Packet Page No. 1534
Item  F. 3.

DATE 09/12/2024
TO Honorable Mayor and City Council Members
FROM Art Interiano, Deputy Community Development Director SUBJECT    Resolution Approving an Alternate Means of Compliance for the Lepashki Homes Project
SUMMARY AND RECOMMENDATION
Lepakshi Homes submitted an application to develop 88 dwelling units and 1,620 square feet of commercial space in two buildings located on Thornton Avenue adjacent to Olive Street and Mulberry Street. The project site is located at the intersection of Thornton Avenue and Olive Street in the central part of the City of Newark. The project is in the Old Town Newark Specific Plan (OTNSP) Area.  As part of the project, the developer requested to provide 13 units to low-income households as an alternative means of compliance to payment of the affordable housing impact fee.

Newark’s Affordable Housing Program requires that developers pay an impact fee to preserve or increase the supply of affordable housing in the city.  As an alternative to paying the impact fee, a developer may provide on-site affordable housing units per Newark Municipal Code (NMC) Section 17.18.050, subject to City Council approval.

Providing affordable units is subject to an Affordable Housing Regulatory Agreement established between the City and the residential developer. To comply with the requirements of NMC Section 17.80.050, the developer has agreed to an Affordable Housing Regulatory Agreement. The Regulatory agreement is between the City and Lepakshi Homes and describes the obligations and securities required by the City.

At their meeting on August 13, 2024, the Planning Commission voted 5-0-0 to approve the Design Review Architectural Permit, Density Bonus Incentives/Waivers, and Vesting Tentative Map for the project (the Entitlements).  The Planning Commission also recommended that the City Council adopt a resolution approving the Alternative Means of Compliance to Payment of the Housing Impact Fee for the Lepakshi Homes project based on an Affordable Housing Regulatory Agreement.  The Entitlements are conditioned upon City Council approval of the Alternative Means of Compliance.

Staff recommends that the City Council adopt a Resolution approving an Alternative Means of Compliance for the Lepakshi Homes project, which will provide 13 units for low-income households in lieu of payment of an affordable housing fee for a project consisting of 88 residential condo units and 1,620 square feet of commercial Packet Page No. 1535
space (APNS: 692-30-14-3, 92-30-15-2, 92-30-16-2, 92-30-17-2, 92-30-18-4, 92-31-15, and 92-31-16-2).

BACKGROUND
Project Context and Proposal
The project is located within the City of Newark’s Old Town Newark Specific Plan (OTNSP) Area, which was established in 2021 via adoption of the OTNSP. The goal of the OTNSP is to create a vibrant, more walkable, and pedestrian-friendly commercial district. The Specific Plan allows for greater residential development in a commercial/mixed-use district format that will allow future residents better walking access to basic goods and services as well as dining and some employment options. It also modifies standards in the residential zoning districts adjacent to the Commercial Core sub-area of the OTNSP to provide a better transition between the higher density core and lower density neighborhoods and increase the residential population that can walk to the services and goods provided in the core.

The site is designated Commercial Mixed Use (CMU) on the City’s General Plan Land Use Map and Zoning Map and is located within the Commercial Core sub-area of the OTNSP. The project is identified as an “opportunity site” for potential future development by the OTNSP.

The project site consists of seven parcels, with Assessor’s Parcel Numbers (APNs):
692-30-14-3, 92-30-15-2, 92-30-16-2, 92-30-17-2, 92-30-18-4, 92-31-15, and 92-31-16-2, which are proposed for consolidated development as two adjacent lots.

The two roughly rectangular lots are separated by a small green space and cul-de-sac area located at the terminus of Olive Street, which is part of the public right-of-way. Lot 1, the larger and more easterly of the two lots, is approximately 43,976 square feet (1.01 acres) and Lot 2, the smaller lot located to the west, is approximately 10,770 square feet (0.25 acres), for a total site area of 54,746 square feet (1.25 acres). The project site is bordered by single-family homes to the west and by commercial development to the north, east, and south.

Project Design
The applicant is proposing to construct a total of 88 units in two buildings (Buildings A and B) on two lots.  The lots are separated by a green space that is in the public right-of-way.  The building design is contemporary Spanish architectural design. The façades include wrought iron balconies and colorful ceramic tiles. The ground floor of the buildings has identifiable entrances along Thornton Avenue that include towers with tile roofs, metal canopies, awnings, tile veneers, horizontal and vertical trim, and accents. Building A is located on Lot 1, which is approximately one acre. This building is five stories and includes a total of 60 multi-family units and 125 parking spaces.

Building B, which is to be located on Lot 2, would have essentially the same architectural style as Building A.  This building would also be five stories, with a maximum height of 62 feet. It would provide 28 residential units and 1,620 square feet of ground floor commercial.  This building would also provide 13 parking spaces.  An additional 22 parking spaces and bike parking for this building would be in the garage for Building A.  Given the significance of this project, staff worked with Larry Cannon of the Cannon Design Group to review the proposed architecture and make Packet Page No. 1536
the Cannon Design Group to review the proposed architecture and make recommendations regarding the project’s consistency with the OTNSP and the overall design of the project.  Mr. Cannon reviewed several iterations of the project and made several recommendations for changes that are summarized below:

Simplify and unify the facades using a common bay and window design whenever possible
Unify the corners of the overall design
Add variety to the top floor heights
Enhance the pedestrian experience
Add projecting eaves and gable ends
Add balconies
The applicant revised the design to implement Mr. Cannon’s recommendations by simplifying the design by using common bay and window designs, varied the heights of the gables, and adding balconies, projecting eaves and gable ends.

Density Bonus Concessions/Waivers
Overall, the project would substantially comply with the Zoning Code, such as the height and parking requirements. While the applicant is not requesting an increase in density, this project qualifies for an incentive/concession due to the amount of affordable units provided.  An incentive/concession is defined as a reduction in site development standards or a modification of zoning code or architectural design requirements, such as a reduction in setback or minimum square footage requirements, approval of mixed-use zoning, or other regulatory incentives or concessions that result in identifiable and actual cost reductions.  In addition, the Density Bonus Law grants the waiver or reduction of an unlimited number of development standards that would have the effect of physically precluding the construction of the development with the density bonus and incentives/concessions requested.

The following sections list the incentive/concession and waivers requested for the project and provide a brief explanation for each.

Incentive/Concession -- Residential on the ground floor - The OTNSP does not permit residential units on the ground floor of a development fronting Thornton Avenue.

Residential may be located elsewhere on the ground-floor if set back a minimum of 10 feet from the property line.  In Building A, there are four units located on the ground floor along Thornton Avenue and one unit along the ground floor on Mulberry Street.

All five units would have to be eliminated to meet this requirement, which would impact the viability of the project.  Not allowing the units on the ground floor also Packet Page No. 1537
impacts the design.  The project has been designed to continue a similar appearance to Building A and to provide the transparency required by the OTNSP.

Waiver #1 – Visibility Triangle - Chapter 10.36 Visibility Requirements requires the sight visibility triangle to be measured from the right-of-way for the new driveways on Thornton Avenue and the corner of Mulberry Street and Thornton Avenue. The applicant requested a waiver to allow the sight visibility triangle to be measured from the face of the curb instead. The site triangle is not needed due to the intersection being right turn only and there is a median on Thornton Avenue that prevents left turns onto Mulberry Street.  The Public Works Engineering Division has reviewed this request and does not object based on the OTNSP policies and standards.

Waiver #2 – Fence Height - Section 17.17.040 Fences and Freestanding Walls allows the maximum height of fences to be 6 feet on non-residential properties along the rear property line.  The applicant requested a waiver to allow the fence to be eight feet tall to provide additional privacy between the project site and the adjoining properties.   The code allows fences to be eight feet tall with approval of a minor use permit.  This request was proposed as a waiver to streamline the approval process and provide additional privacy for the adjacent neighbors.

Waiver #3 – Width Requirement for Commercial Space - Section 17.080.040(A) Requires commercial space to be a minimum of thirty-feet wide. The width of the commercial space in Building B ranges from 23 feet to 26 feet.  This building is on Lot 2 and is a narrow lot that is just over 10,000 square feet.  Redesigning the commercial space to provide a minimum dimension of 30 feet would require relocating the stairs and mechanical space and would either result in not having sufficient parking or potentially having to reduce the unit count to accommodate the reduction in parking.

Some of the parking for Building B (22 spaces), is located in Building A and there is not sufficient space to accommodate any loss of parking in Building B.

Vesting Tentative Tract Map
The applicant requested for a Vesting Tentative Tract Map 8632 to construct the 88 multi-family units and 1,620 square feet of commercial space on two lots that would replace the existing seven lots. The two roughly rectangular parcels are separated by a small green space and cul-de-sac area located at the terminus of Olive Street, which is part of the public right-of-way. This area will continue to be owned and maintained by the City and will be landscaped as part of the Thornton Avenue Streetscape project.

California Environmental Quality Act (CEQA)
In 2021 the City of Newark certified the OTNSP Addendum to the General Plan EIR which analyzed the environmental impacts of implementation of the OTNSP, including development of the project site. This analysis determined that implementation of the OTNSP would not result in any new or substantially more severe environmental effects than what was already disclosed and analyzed in the General Plan EIR that was certified in 2013. As discussed in the Environmental Checklist), the project would not result in substantially more significant (or severe) environmental effects than those identified in the Addendum to the General Plan EIR. Based on this analysis, the project qualifies Section 15183.3 of CEQA Guidelines which limits project level review for infill Packet Page No. 1538
developments for which effects have been addressed by planning decisions or uniformly applicable development policies. Additionally, this analysis demonstrates that the project also qualifies for an Eligible Community Plan or Zoning Exemption and Infill Exemption, and no additional environmental review is required under CEQA Guidelines Sections 15183 and 15183.3.

Community Meeting
The applicant held two community meetings for the project. The first meeting was held on July 6, 2023, at the Silliman Activity and Family Aquatic Center and the other on June 20, 2024, at the Community Meeting Room in the Newark Library.

At the July 6, 2023, there were approximately eight people in attendance at the meeting. Residents raised questions and concerns regarding parking, traffic along Olive Street and Thornton Avenue, the height of Building B being too tall and that it would cast a shadow and overlook onto a single-family residential property. The residents also requested that the open space area at the Olive Street cul-de-sac look aesthetically pleasing. Since the meeting, the applicant has made changes to the design of the project and scheduled a second community meeting on June 20, 2024.

At the June 20, 2024, community meeting, the applicant presented an updated overview of the project. The project architect attended virtually. Approximately six people attended the meeting. Comments included questions about parking along the street and vehicular traffic from the project's residential units.

DISCUSSION/ANALYSIS
Affordable Housing Program
Affordable housing in Newark is guided by existing policies and actions contained in the 2015-2023 Housing Element and the requirements within the NMC Chapter 17.18, Affordable Housing Program. State housing law provides additional requirements and regulations for the development and maintenance of affordable housing. Together, these policies and regulations provide the affordable housing framework upon which affordable housing decisions are made within Newark. The City’s Community Development Department (CDD) is responsible for implementing affordable housing policies and laws.

Newark’s Affordable Housing Program requires that developers pay an impact fee to preserve or increase the supply of affordable housing in the city.  As an alternative to paying the impact fee, a developer may provide on-site affordable housing units per NMC 17.18.050, subject to City Council approval.

Affordable Housing Request
The project is providing 13 units that will be sold to low-income households.  Affordable housing in Newark is guided by existing policies and actions contained in the 2023-2031 Housing Element such as increasing access to affordable housing by requiring on-site production of units rather than allowing the payment of an in-lieu or impact fee to support increased access to affordable housing opportunities across the city and in high opportunity areas and the requirements within the NMC Chapter 17.18, Packet Page No. 1539
city and in high opportunity areas and the requirements within the NMC Chapter 17.18, Affordable Housing Program. State housing law provides additional requirements and regulations for the development and maintenance of affordable housing. Together, these policies and regulations provide the affordable housing framework upon which affordable housing decisions are made within Newark. The City’s Community Development Department (CDD) is responsible for implementing affordable housing policy and laws.

Alternative Means of Compliance
Newark’s Affordable Housing Program requires that developers pay an impact fee to preserve or increase the supply of affordable housing in the city.  As an alternative to paying the impact fee, a developer may provide on-site affordable housing units per NMC 17.18.050, subject to City Council approval. The developer is requesting to provide 13 affordable units in-lieu of paying the impact fee.

The current Housing Impact Fee rate for multi-family residential projects is $24.68 per square foot of floor area for the first 1,000 square feet and $9.89 per square foot above 1,000 square feet, per unit.  Based on the proposed size and number of residential units from both projects, the Housing Impact Fee for the 88 units would be $1,971,253. As allowed by NMC 17.18.050, residential developers may provide affordable units on site as an alternative to payment of the Housing Impact Fee, subject to City Council approval. As part of the Housing Impact fee resolution, the City Council established minimum percentages and affordability levels for affordable units which, if satisfied, would automatically qualify as an approved alternative means of compliance without the need for further approval. Applicants may still propose alternative means of compliance, but City Council approval is required.

For the proposed development, 17% (15 units) of the units would need to be provided as affordable housing (divided between very low-income, low income, and moderate income) to mitigate housing impacts per Resolution 10,184. However, the city has requested, and the developer is providing 15% (13 units) at the low-income affordability level.

The affordable units would be provided as affordable housing to households with an income of no greater than 80% of the Area Median Income for Alameda County. The units would consist of a mix of eleven 1-bedroom and two 2-bedroom units.  Staff believes the proposed affordable units will be more beneficial and appeal to a larger pool of future residents in the area. While this would result in a fewer number of overall affordable units, all the units will be low-income units, with no moderate-income units.

This will help support homeownership opportunities for low-income households, which are rare.

Regarding the location of the affordable units, a total of 11 units will be in Building B, including 9 one-bedroom units and 2 two-bedroom units. Two one-bedroom units will be in Building A. The affordable units will be indistinguishable from the market-rate units. Providing below-market rate units in-lieu of paying housing impact fees has been strongly supported by the City in the past.

Packet Page No. 1540
Affordable Housing Regulatory Agreement
Providing affordable units are subject to an Affordable Housing Regulatory Agreement established between the City and the residential developer. To comply with the requirements of NMC Section 17.80.050, the developer has agreed to an Affordable Housing Regulatory Agreement (Attachment 1, Exhibit A). The Regulatory Agreement is between the City and Lepakshi Homes and describes the obligations and securities required by the City. The Regulatory Agreement establishes standards to enforce implementation and management requirements for the affordable units. This agreement would establish the total affordable unit count and income category distribution described, set the deed-restricted affordable duration (45 years), Newark local preference and various other terms for Lepakshi’s homes initial sale of the units.

Individual buyers of the affordable units will be required to enter into similar agreements at the time of purchase to ensure the units are used as affordable housing. This agreement would also establish administrative and ongoing management requirements. When the affordable units are resold, the Homebuyer will retain the value of any improvements, be reimbursed for the down payment, and the appreciation, per State law, will be equally shared between the City and the Homebuyer.  The City's share of the appreciation would be deposited into the City's Housing Fund, which funds the City's affordable housing programs.

In terms of implementation, the Community Development Department's Planning Division will oversee compliance with the agreement as part of their duties.

Additionally, a consulting firm is expected to be hired to assist with the sale and resale of units citywide.

FISCAL IMPACT
Approval of the Alternate Means of Compliance for the Lepashki Homes will result in the creation of 13 affordable units for low-income residents in-lieu of paying housing impact fees to the city in the amount of $1,971,253. The housing impact fee amount is an approximate amount based on the housing impact fee that would be applicable today, based on the City's Impact Fee Schedule for Fiscal Year 2024/2025.

ENVIRONMENTAL/PLANNING COMMISSION REVIEW
The Planning Commission reviewed the project at their meeting of August 13, 2024.

One member of the public spoke at the meeting and expressed concern about traffic.

As part of the environmental review of the project, it was determined that all potential environmental impacts had no significant impact and that the project qualified for the Eligible Community Plan or Zoning Exemption and Infill Exemption and no additional environmental review is required.  At the conclusion of the meeting, the Commission voted 5-0 to approve the Design Review, Density Bonus Concessions/Waivers and Vesting Tentative Map applications.  The Commission also voted 5-0 to recommend that the City Council approve the Alternative Means of Compliance for Paying the Affordable Housing Fee.

REVIEW AND APPROVAL
Prepared by - Art Interiano, Deputy Community Development Director Packet Page No. 1541
Prepared by - Art Interiano, Deputy Community Development Director Reviewed by - Steven Turner, Community Development Director Reviewed by - Krysten Lee, Finance Director
Reviewed by - Kristopher J. Kokotaylo, City Attorney
Approved by - David J. Benoun, City Manager
Attachments
Resolution Alternative Means of Compliance
Exhibit A-Affordable Housing Regulatory Agreement
Project Plans
Presentation
Packet Page No. 1542
Resolution No. ______ 1 of 3
RESOLUTION NO. ______

RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

NEWARK APPROVING AN ALTERNATE MEANS OF

COMPLIANCE TO PAYMENT OF HOUSING IMPACT FEES
FOR THE LEPAKSHI HOMES PROJECT CONSISTING OF 88
RESIDENTIAL UNITS AND 1,620 SQUARE FEET OF
COMMERCIAL (APNS: 692-30-14-3, 92-30-15-2, 92-30-16-2, 92- 30-17-2, 92-30-18-4, 92-31-15, AND 92-31-16-2)
WHEREAS, Lepakshi Homes (the “Applicant”) submitted an application to develop 88 dwelling units (including 13 units that will be sold to low-income households) and 1,620 square feet of commercial in two buildings located on Thornton Avenue APNS: (692-30-14-3, 92-30-15- 2, 92-30-16-2, 92-30-17-2, 92-30-18-4, 92-31-15, and 92-31-16-2) (the “Property”) (the “Project”); and
WHEREAS, the Applicant proposes to demolish the existing buildings and site improvements; and
WHEREAS, the Property consists of seven parcels, which are proposed for consolidated development as two adjacent lots. Lot 1 is approximately 43,976 square feet (1.01 acres) and Lot 2, is approximately 10,770 square feet (0.25 acres), for a total site area of 54,746 square feet (1.25 acres and are designated Commercial Mixed Use (“CMU”) on the City’s General Plan Land Use Map and Zoning Map; and
WHEREAS, the Project will consist of condominium units, and the Applicant has obtained a condominium map or similar approval so that each of the units may be independently conveyed; and
WHEREAS, Newark Municipal Code (“NMC”) Chapter 17.18 requires that developers of residential housing units pay a housing impact fee to contribute to the supply of housing for households with very low, low, and moderate incomes. The amount of the housing impact fee was established by the Newark City Council pursuant to Resolution No. 10,184; and WHEREAS, NMC Section 17.18.050 allows a developer to provide on-site affordable units as an alternative to paying the housing impact fee, provided that the proposed alternative means of compliance is approved by the City Council in accordance with the procedures set forth in Section 17.18.050; and
WHEREAS, the Applicant has proposed restricting the sale, and occupancy, of thirteen (13) units in the Project at an affordable price (the “Restricted Units”). The Restricted Units shall be offered for sale to households with an income of no greater than eighty percent (80%) of the Area Median Income; and
Packet Page No. 1543
Resolution No. ______ 2 of 3
WHEREAS, the Parties have agreed to enter into and record an Affordable Housing Regulatory Agreement in order to satisfy the conditions described in the foregoing Recitals and in NMC Chapter 17.18. The purpose of this Agreement is to regulate and restrict the occupancy and sale of the Project’s Restricted Units for the benefit of the Project occupants and the City. The Parties intend that the covenants outlined in this Agreement to run with the land and to be binding upon all parties having or acquiring any right, title or interest in the Property or any part thereof, their heirs, successors and assigns; and
WHEREAS, the Planning Commission held a public hearing on August 13, 2024, and fully considered the Project, entitlements, staff report, findings of fact, conditions of approval, public comments, and all other testimony and evidence presented at the public hearing and approved the Project entitlements conditioned upon approval of the alternative means of compliance to payment of the housing impact fee. The Planning Commission also made the necessary findings pursuant to NMC Section 17.18.50(D) to recommend City Council approval of the alternative means of compliance to payment of the housing impact fee.

NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Newark as follows:

Section 1. That the forgoing recitals are true and correct and made part of this Resolution.

Section 2. The City Council finds that alternative means of compliance for the Applicant to provide 13 Restricted Units for sale to households with an income of no greater than eighty percent (80%) of the Area Median Income as an alternative means of compliance to payment of the housing impact fee fulfills the requirements of NMC Section 17.18 for the Project and fully mitigates the impacts of the Project on the need for affordable housing, based on the community needs and the characteristics of the Project and makes the following findings pursuant NMC 17.18.050(D): 1) the proposed alternative means of compliance fulfills the purposes of NMC Chapter 17.18 as set forth in NMC Section 17.18.010, to provide of safe and stable housing for households at all income levels is essential for the public welfare of the city; 2) the proposed alternative means of compliance will further affordable housing opportunities in the city to an equal or greater extent than compliance with the requirements of NMC Section 17.18.020, and will fully mitigate the impact of the Project on the need for affordable housing; 3) the proposed alternative means of compliance would better address the city's needs than compliance with the requirements of NMC Section 17.18.020; and 4) the proposed alternative means of compliance will not unduly concentrate affordable housing in one geographic area so as to result in housing segregation.

Section 3. Based on the findings and determinations, the City Council hereby approves an Alternate Means of Compliance to Payment of Housing Impact Fees for a residential development to provide 13 units that will be sold to households with an income of no greater than eighty percent (80%) of the Area Median Income as part of a development consisting of 88 dwelling units and 1,620 square feet of commercial in two buildings located on Thornton Avenue APNS: 692-30-14- 3, 92-30-15-2, 92-30-16-2, 92-30-17-2, 92-30-18-4, 92-31-15, and 92-31-16-2, subject to the Affordable Housing Regulatory and Satisfaction Agreements as further set forth in Exhibit A attached hereto and incorporated herein by this reference, as approved to form by the City Packet Page No. 1544
Resolution No. ______ 3 of 3
Attorney.

Section 4. The City Manager is authorized to take all actions necessary to implement the intent of this Resolution including execution of all necessary documents, in a form approved by the City Attorney.

Packet Page No. 1545
1 Recording requested by and when
recorded mail to:

City of Newark
37101 Newark Blvd.

Newark, CA 94560
Attn: Community Development Director

EXEMPT FROM RECORDING FEES PER
GOVERNMENT CODE §§6103, 27383
APNs Space above this line for Recorder’s use.

AFFORDABLE HOUSING REGULATORY AGREEMENT
AND

DECLARATION OF RESTRICTIVE COVENANTS
by and between

THE CITY OF NEWARK,
a California Municipal Corporation
and

KISHORE POLAKALA,
an individual
(Lepashki Homes)
Packet Page No. 1546
2 THIS AFFORDABLE HOUSING REGULATORY AGREEMENT AND
DECLARATION OF RESTRICTIVE COVENANTS (this “Agreement”) is entered into effective as of _____________, 2024 (the “Effective Date”) by and between the City of Newark, a California municipal corporation (the “City”) and Kishore Polakala, an individual (“Developer”). Developer and City are hereinafter collectively referred to as the “Parties.”

RECITALS
A. The Developer is the owner of that certain real property located at 6781 Thornton Avenue in Newark California, also known as Alameda County APNs 92-30-14-3, 92-30-15-2, 92-30-16-2, 92-30-17-2, 92-30-18-4, 92-31-15, and 92-31-16-2, as further described in Exhibit A, attached hereto and incorporated herein (the “Property”).

B. On _____________ the Planning Commission for the City of Newark adopted Resolution No. _______ (the “Resolution”) approving Design Review for a residential development consisting of two 4-story buildings, with a total of 88 units (each a “Unit”) located on the Property (the “Project”).

C. The Project will consist of condominium units, and the Developer has obtained a condominium map or similar approval so that each of the Units may be independently conveyed.

D. Newark Municipal Code (“NMC”) chapter 17.18 requires that developers of residential housing units pay a housing impact fee to contribute to the supply of housing for households with very low, low, and moderate incomes. The amount of the housing impact fee was established by the Newark City Council pursuant to Resolution No. 10,184.

E. NMC Section 17.18.050 allows a developer to provide on-site affordable units as an alternative to paying the housing impact fee, provided that the proposed alternative means of compliance is approved by the City Council in accordance with the procedures set forth in Section 17.18.050.

F. The Developer has proposed restricting the sale, and occupancy, of thirteen (13) units in the Project at an affordable price (the “Restricted Units”). The restricted units shall be offered for sale to households with an income of no greater than eighty percent (80%) of the Area Median Income (the “Low Income Units”).

G. The City Council has determined that the proposed alternative means of compliance would better address the City’s need for affordable housing rather than the payment of the housing impact fee, and approved this alternative pursuant Newark City Council Resolution No. _______.

H. The affordability restrictions imposed on the Restricted Units will last for a period of forty-five (45) years.

Packet Page No. 1547
3 I. The City is not providing any financial support for the construction of the Project, and the Owner has requested the City enter into this agreement.

J. The Parties have agreed to enter into and record this Agreement in order to satisfy the conditions described in the foregoing Recitals and in Newark Municipal Code chapter 17.18.

The purpose of this Agreement is to regulate and restrict the occupancy and sale of the Project’s Restricted Units for the benefit of the Project occupants and the City. The Parties intend the covenants set forth in this Agreement to run with the land and to be binding upon all parties having or acquiring any right, title or interest in the Property or any part thereof, their heirs, successors and assigns.

NOW THEREFORE, for good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged, the Parties declare, covenant and agree by and for themselves, administrators and assigns, and all persons claiming under or through them, that the Property shall be held, transferred, encumbered, hypothecated, used, sold conveyed, improved, leased, and occupied subject to the covenants, conditions and restrictions hereinafter set forth, and further agree as follows.

1. Definitions. The following terms shall have the meanings set forth below whenever such terms are used in this Agreement and the Exhibits attached hereto. Additional terms are defined in the Recitals and text of this Agreement.

1.1 “Area Median Income” or “AMI” means the area median income for Alameda County California, adjusted for household size, published periodically by the California Department of Housing and Community Development (“HCD”) in Section 6932 of Title 25 of the California Code of Regulations or successor provision published pursuant to California Health and Safety Code Section 50093(c). If HCD ceases to make such determination, Area Median Income shall be the median income applicable to Alameda County, with adjustments for household size, as determined from time to time by the U.S.

Department of Housing and Urban Development ("HUD") pursuant to the United States Housing Act of 1937 as amended, or such other method of median income calculation applicable to the City of Newark that HUD may hereafter adopt in connection with such Act.

1.2 “Eligible Buyer” means a prospective purchaser of a Restricted Unit who has been pre-qualified by the City or its designee and who satisfies all of the following requirements:
(a) gross income for the prospective purchaser’s household does not exceed Low-Income and has not exceeded such amount for the full calendar year immediately preceding the date of purchase.
(b) The prospective purchaser certifies that he or she intends to occupy the Restricted Unit as his or her principal residence.
(c) The prospective purchaser does not own any other residential real property at the time of the purchase.

Packet Page No. 1548
4 (d) The prospective purchaser meets all other applicable eligibility requirements of the City in effect at the time of the purchase.

1.3 “Low-Income” means an annual household gross income of not greater than eighty percent (80%) of the Area Median Income, adjusted for household size.

1.4 “Maximum Initial Sale Price” means the maximum initial price for a Restricted Unit as described in Sections 3 and 3.1.

1.5 “Restricted Unit” means of the residential unit located on the Property which is reserved for sale to an Eligible Buyer at a price that will result in an Affordable Housing Cost in accordance with and as set forth in Sections 3 and 3.1.

2. Marketing; Qualification of Eligible Buyers.
(i) Developer shall market the Restricted Unit to Eligible Buyers in compliance with all applicable fair housing laws. In City’s discretion, the City shall pre-qualify Eligible Buyers or shall delegate such responsibility to another entity or to Developer. Developer shall provide to the City proof that prospective purchasers of the Restricted Unit qualify as Eligible Buyers at such time and in such form as City may reasonably require. (ii) In selling the Restricted Units, Developer shall give first preference to Eligible Buyers in which at least one member lives or works in the City of Newark, and second preference to Eligible Buyers in which at least one member lives or works in Alameda County, unless compliance with the foregoing criteria is prohibited by law or by state or federal sources of financing for the Project, in which case Owner shall notify City of this fact in writing.

3. Sale of Restricted Unit. Developer shall sell the Restricted Unit in accordance with all of the following terms and conditions:
(i) The Restricted Units shall be sold only to an Eligible Buyer who has been prequalified by City or its designee at a price not in excess of the Maximum Initial Sale Price. The size and mix of the Restricted Units shall be as follows:
1-Bedrooms 2-Bedroom Total
Low-Income 11 2 13
(ii) The Restricted Units shall be sold at a price not in excess of the Maximum Initial Sale Price to an Eligible Buyer whose household gross income does not exceed Low-Income. (iii) The Restricted Unit shall be of the same general design as the other units in the Project and shall be comparable to such units in size, amenities and quality of construction. The Packet Page No. 1549
5 Restricted Units shall be intermingled with the other Units on the Property. Residents in all dwelling units, including the Restricted Units, shall have equal access to and enjoyment of all common facilities of the Project.
(iv) All of the Restricted Units shall be constructed concurrently with, or earlier than, other dwelling units in the Project. For purposes of this Agreement, “concurrent construction,” shall mean that at least one (1) Restricted Unit must be available for occupancy for every six (6) dwelling units available for rent and occupancy.
(iv) In connection with the sale of each Restricted Unit, Developer shall require the purchaser to execute a Homebuyer Resale Restriction Agreement(“Homebuyer Resale Agreement”) in a form provided by City and shall cause such Homebuyer Resale Agreement to be recorded in the Official Records of Alameda County concurrently with the recordation of the grant deed conveying title to the Property. The Homebuyer Resale Agreement shall provide that when Homebuyer sells the Property, the Homebuyer shall retain the value of any improvements, the downpayment, and the Homebuyer’s proportionate share of appreciation, and the City shall recapture the initial subsidy and receive its proportionate share of the appreciation, as further specified in Government Code section 65915(c)(2)(C). City may, in City’s discretion, require the execution, delivery and recordation of additional documents in connection with the sale of the Restricted Unit, including without limitation disclosure documents and a performance deed of trust securing the homebuyer’s obligations under the Homebuyer Resale Agreement.

3.1 Maximum Initial Sale Price. Developer shall sell the Property, and the Restricted Unit located thereon, to an Eligible Buyer at a price that is not in excess of the Maximum Initial Sale Price as determined by the City. The Parties acknowledge that the Maximum Initial Sale Price is intended to enable Eligible Buyers to purchase the Restricted Unit at a price that will result in affordable housing costs for such Eligible Buyers. (i) Area Median Income for Eligible Buyers shall be determined at the time the Eligible Buyer is pre-qualified for purchase in accordance with Section 2 hereof; (ii) The Maximum Initial Sale Price means a home purchase price resulting in an average monthly housing cost (including mortgage loan principal and interest, mortgage insurance fees, property taxes and assessments, an allowance for property maintenance and repairs established by the City based on the initial cost and size of the home, homeowner’s insurance premiums, a reasonable utility allowance, and homeowner’s association dues) which is equal to or less than:
(a) For Low-Income Households: one-twelfth (1/12th) of thirtypercent (30%) of seventy percent (70%) of Area Median Income, adjusted for household size. (b) Amounts for utility allowances and other monthly housing cost factors including assumed mortgage interest rates, mortgage insurance fees, maintenance and repair allowances, homeowners' insurance, and homeowner’s association dues, shall be Packet Page No. 1550
6 reasonably established by the City in consultation with guidance and regulations published by the Alameda County Housing Authority, or if not available, guidance and regulations published by the California Department of Housing and Community Development and/or the United Stated Department of Housing and Urban Development.

3.2 Compliance Monitoring. Prior to the close of escrow for the initial sale of the Property, Developer shall forward to the City evidence of the purchaser’s status as an Eligible Buyer, copies of the buyer’s and seller’s settlement statements, and executed copies of all closing documents, including the Homebuyer Resale Agreement and such other documents as City may require.

4. Enforcement. The City is deemed to be the beneficiary of this Agreement and the covenants herein, both for and in its own right and for the purpose of protecting the interests of the community and other parties, public or private, for whose benefit this Agreement and the covenants set forth herein have been provided. If any such covenants are breached, the City shall have the right to exercise all rights and remedies at law or in equity, expressly including the remedy of specific performance, and to maintain any actions or suits at law or in equity or other proper proceedings to enforce the curing of such breaches. Except as otherwise expressly stated in this Agreement, the rights and remedies of the parties hereunder are cumulative.

5. Default and Remedies.

5.1 Events of Default. The occurrence of any one or more of the following events shall constitute an event of default hereunder ("Event of Default"):
(a) Developer’s failure to maintain insurance on the Property and the Project as required hereunder, and the failure of Developer to cure such default within ten (10) business days.
(b) Subject to Developer’s right to contest the following charges, Developer’s failure to pay taxes or assessments due on the Property or the Project or failure to pay any other charge that may result in a lien on the Property or the Project, and Developer’s failure to cure such default within ten (10) business days.
(c) Developer’s default in the performance of any term, provision or covenant under this Agreement, and unless such provision specifies a shorter cure period for such default, the continuation of such default for ten (10) business days in the event of a monetary default or thirty (30) days in the event of a non-monetary default following the date upon which City shall have given written notice of the default to Developer, or if the nature of any such non-monetary default is such that it cannot be cured within thirty (30) days, Developer’s failure to commence to cure the default within thirty (30) days and thereafter prosecute the curing of such default with due diligence and in good faith, but in no event longer than sixty (60) days from receipt of the notice of default.

Packet Page No. 1551
7 5.2 Remedies. If within the applicable cure period, Developer fails to cure a default or fails to commence to cure and diligently pursue completion of a cure, as applicable, or if a cure is not possible, City may bring an action for equitable relief seeking the specific performance of the terms and conditions of this Agreement, and/or enjoining, abating, or preventing any violation of such terms and conditions, and/or seeking declaratory relief; or exercise any rights and remedies available to City under applicable law or in equity.

5.3 Liquidated Damages. In the event that the Developer sells a Restricted Unit in violation of this Agreement, the City shall retain or recover from Developer the surplus, if any, as its property without any deduction, offset or recoupment whatsoever. For the purposes of this section, the surplus shall be the difference between the actual sales price or fair market value (whichever is greater) net of reasonable and customary real estate commissions paid, and the Maximum Initial Sales Price as applicable under the terms of this Agreement at the time of sale of the Property. If the Developer should sell the Property at market rate to an individual who shall receive title free and clear of the provisions of this Agreement, then the damages suffered by the City by reason thereof would be uncertain.

Such damages would involve the replacement costs for another affordable unit, and the expenses of continuing the ownership and control of the Property by the City; postponement of tax revenues therefrom to the community; and the failure of the City to effect its purposes and objectives within a reasonable time, resulting in additional immeasurable damage and loss to the City and the community. It is impractical and extremely difficult to fix the amount of such damages to the City, but the Parties are of the opinion, upon the basis of all information available to them, that such damages would exceed the amount of any projected surplus as the total of all liquidated damages and not as a penalty. In the event that this section should be held to be void for any reason by a court of law, the City shall be entitled to seek the full extent of damages otherwise provided by law.

5.4 No Waiver. No failure or delay by the City in the assertion of any of its rights and remedies as to any default shall operate as a waiver of any default or of any such rights or remedies.

5.5 Limitation on Damages. In no event shall damages be awarded against City upon an event of default or upon termination of this Agreement

5.6 Mortgagee Right to Cure Default. This Agreement shall be recorded in the Official Records of Alameda County and shall be superior and senior to any lien thereafter placed upon the Property, or any portion thereof, including the lien for any loan, deed of trust, or mortgage ("Mortgage"). Notwithstanding the foregoing, no breach hereof shall defeat, render invalid, diminish or impair the lien of any Mortgage made in good faith and for value, but all the terms and conditions contained in this Agreement shall be binding upon and effective against any person or entity, including any lender, deed of trust beneficiary, or mortgagee ("Mortgagee") Packet Page No. 1552
8 who acquires title to the Property, or any portion thereof, by foreclosure, trustee's sale, deed in lieu of foreclosure, or otherwise.

5.7 Rental of Units. The Developer shall not Rent the Restricted Units, without the prior written consent of the City, which may be withheld or conditioned by the City as it deems necessary, in its sole discretion, to ensure that the Restricted Unis are made available to and occupied by income eligible households.

6. Covenants to Run with the Land. Developer hereby subjects the Property to the covenants, conditions and restrictions set forth in this Agreement. The Parties hereby declare their express intent that all such covenants, conditions and restrictions shall be deemed covenants running with the land and shall pass to and be binding upon the Developer’s successors in title to the Property. All covenants without regard to technical classification or designation shall be binding for the benefit of the City, and such covenants shall run in favor of the City for the entire term of this Agreement. Each and every contract, deed or other instrument hereafter executed applicable to or conveying the Property or any portion thereof shall conclusively be held to have been executed, delivered and accepted subject to such covenants, conditions and restrictions, regardless of whether such covenants, conditions and restrictions are set forth in such contract, deed or other instrument.

7. Nondiscrimination.

7.1 Nondiscrimination. There shall be no discrimination against or segregation of any person, or group of persons, on account of any basis listed in subdivision (a) or (d) of Section 12955 of the Government Code, as those bases are defined in Sections 12926, 12926.1, subdivision (m) and paragraph (1) of subdivision (p) of Section 12955, and Section 12955.2 of the Government Code, in the sale, lease, sublease, transfer, use, occupancy, tenure or enjoyment of the Property or the Project, or any part thereof, nor shall Developer, or any party or person claiming under or through Developer, establish or permit any such practice or practices of discrimination or segregation with reference to the selection, location, number, use or occupancy of tenants, lessees, subtenants, sublessees or vendees of the Property, or any part thereof.

7.2 Anti-Discrimination Clauses in Agreements. Developer and its successors and assigns shall refrain from restricting the rental, sale, or lease of any portion of the Property or the Project to any person on account of any basis listed in subdivision (a) or (d) of Section 12955 of the Government Code, as those bases are defined in Sections 12926, 12926.1, subdivision (m) and paragraph (1) of subdivision (p) of Section 12955, and Section 12955.2 of the Government Code. All such deeds, leases or contracts shall contain or be subject to substantially the following nondiscrimination or non-segregation clauses:

8. Term; Release of Property from Agreement.
(a) Subject to paragraph (b) below, the term of this Agreement shall commence upon the Effective Date, and shall, without regard to technical classification or Packet Page No. 1553
9 designation, shall run with the land and be binding on Developer and its successors and assigns for the benefit of the City and the City. The covenants contained in this Agreement shall remain in effect for the longest feasible time, but not less than forty-five (45) years. (b) Notwithstanding the foregoing paragraph, this Agreement shall be terminated and the lien hereof shall be extinguished and released from title to the Property upon the occurrence of all the following: (i) the issuance of final certificates of occupancy for each Restricted Unit, (ii) the sale of each Restricted Unit to an Eligible Buyer, and (iii) the recordation of the Homebuyer Resale Agreement and City Deed of Trust for all Restricted Units. Provided that conditions (i) through (iii) above have been satisfied with regards to an entire building with the Project, then that specific building will be released from this Agreement.

9. Insurance and Indemnity.

9.1 Indemnity. Developer shall indemnify, defend (with counsel approved by City) and hold City, its elected and appointed officers, officials, employees, agents, and representatives (collectively, the “Indemnitees”) harmless from and against all liability, loss, cost, expense (including without limitation attorneys’ fees and costs of litigation), claim, demand, action, suit, judicial or administrative proceeding, judgment, penalty, deficiency, fine, order, and damage (all of the foregoing collectively “Claims”) arising directly or indirectly, in whole or in part, as a result of or in connection with Developer’s development, sale or ownership of the Restricted Unit and/or the Project, or Developer’s performance or nonperformance under this Agreement.

Developer’s indemnification obligations under this Section 10.1 shall not extend to Claims resulting solely from the gross negligence or willful misconduct of Indemnitees. The provisions of this Section 9.1 shall survive the expiration or earlier termination of this Agreement and the release of the Property or any part thereof from the burdens of this Agreement. It is further agreed that City and City do not and shall not waive any rights against Developer that they may have by reason of this indemnity and hold harmless agreement because of the acceptance by City, or the deposit with City by Developer, of any of the insurance policies described in this Agreement.

9.2 Insurance. For so long as Developer maintains an interest in the Restricted Unit, Developer shall maintain at Developer’s expense, comprehensive general liability insurance and property damage insurance with such coverage and limits as may be reasonably requested by City from time to time, but in no event less than the sum of Two Million Dollars ($2,000,000) per occurrence combined single limit. Such policies shall be issued by insurers licensed to issue such policies in California and having a rating of A-VII or better in Best’s Insurance Guide, shall be primary coverage not contributing with and not in excess of any coverage that City may carry, and shall name the Indemnitees (defined in Section 10.1) as additional insureds. Upon City request, Developer shall provide City with such proof of insurance as City shall reasonably request.

Packet Page No. 1554
10 10. Miscellaneous.

10.1 Notices. Except as otherwise specified in this Agreement, all notices required to be sent pursuant to this Agreement shall be made by personal delivery or by deposit in the United States mail, first-class, postage prepaid, and shall be deemed to have been delivered and received on the date of personal delivery or five (5) days after deposit in the mail, if sent to the following address:

City: City of Newark
37101 Newark Blvd.

Newark, CA 94560
Attn: Community Development Director
Developer: KISHORE POLAKALA, Developer
[Address]
[Address]
[Address]

10.2 Attorneys’ Fees. If a party to this Agreement brings any action, including an action for declaratory relief, to enforce or interpret the provision of this Agreement, the prevailing party shall be entitled to reasonable attorneys’ fees in addition to any other relief to which that party may be entitled. The court may set such fees in the same action or in a separate action brought for that purpose.

10.3 Waivers; Modification. No waiver of any breach of any covenant or provision of this Agreement shall be deemed a waiver of any other covenant or provision hereof, and no waiver shall be valid unless in writing and executed by the waiving party. An extension of time for performance of any obligation or act shall not be deemed an extension of the time for performance of any other obligation or act, and no extension shall be valid unless in writing and executed by the waiving party. This Agreement may be amended or modified only by a written instrument executed by the Parties and duly recorded in the Official Records of Alameda County.

10.4 Severability. If any provision of this Agreement is held by a court of competent jurisdiction to be invalid or unenforceable, the remainder of this Agreement shall continue in full force and effect.

10.5 Captions; Construction. Each party hereto has had an equivalent opportunity to participate in the drafting of the agreement and/or to consult with legal counsel. Therefore, the usual construction of an agreement against the drafting party shall not apply hereto.

10.6 Action or Approval. Whenever action and/or approval by City is required under this Agreement, the City Manager or his or her designee may act on and/or approve such matter Packet Page No. 1555
11 unless specifically provided otherwise, or unless the City Manager determines in his or her discretion that such action or approval requires referral to City Council consideration.

10.7 Entire Agreement. This Agreement, including Exhibits A, B and C attached hereto and incorporated herein by this reference contains the entire agreement of the Parties with respect to the subject matter hereof, and supersedes all prior written or oral agreements, understandings, representations or statements with respect to the subject matter hereof.

10.8 Binding on Successors. This Agreement shall be binding upon and inure to the benefit of the Parties and their respective successors and assigns. Each reference in this Agreement to a specifically named Party shall be deemed to apply to any successor or assign of such Party who has acquired an interest in the Property.

10.9 Due Authorization. Developer hereby represents and warrants that all actions necessary on the part of Developer to authorize the execution of this Agreement and to undertake the actions contemplated hereby have been undertaken and the persons executing this Agreement on behalf of Developer have been duly authorized to do so.

10.10 Parties Not Co-Venturers. Nothing in this Agreement is intended to or shall establish the Parties as partners, co-venturers, or principal and agent with one another.

10.11 Counterparts. This Agreement may be executed in multiple counterparts, each of which shall be an original and all of which together shall constitute one instrument.

10.12 Further Assurances. The Parties agree to execute such instruments and to undertake such actions, as may be necessary to effectuate the intent of this Agreement.

10.13 Governing Law; Venue. This Agreement shall be governed by and construed in accordance with the laws of the State of California without regard to principles of conflicts of laws. Any action to enforce or interpret this Agreement shall be filed in the Superior Court of Alameda County, California or in the Federal District Court for the Northern District of California.

10.14 Time is of the Essence. In all matters under this Agreement, the Parties agree that time is of the essence.

Packet Page No. 1556
12 IN WITNESS WHEREOF, the City and Developer have executed this Regulatory Agreement and Declaration of Restrictive Covenants as of the date first written above.

CITY

CITY OF NEWARK
a municipal corporation
By:_________________________________
David Benoun, City Manager
ATTESTATION:

By: ________________________
Sheila Harrington, City Clerk
APPROVED AS TO FORM:

By: ________________________
DEVELOPER:

KISHORE POLAKALA
an individual
By:_________________________________
By:_________________________________
______________
Kristopher J. Kokotaylo, City Attorney
SIGNATURES MUST BE NOTARIZED.
20005116.1
Packet Page No. 1557
2 A Notary Public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

State of California
County of __________________
On ___________________before me, _________________________________, a Notary Public, personally appeared ______________________________________________, who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument, and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signatures(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.
______________________________________
Signature of Notary
Packet Page No. 1558
Exhibit A

PROPERTY
(Attach legal description)
Packet Page No. 1559
Exhibit B

SITE PLAN
(Attach Planning Commission approved Site Plan)
Packet Page No. 1560
Packet Page No. 1561

DRAWING INDEX
Sheet
Number Sheet Name
PA100 COVER & PROJECT INFORMATION
C-1 COVER SHEET
C-2 EXISTING CONDITIONS
C-3 DEMOLITION PLAN
C-4 TYPICAL STREET SECTIONS
C-5 PRELIMINARY SITE PLAN
C-6 PRELIMINARY GRADING PLAN
C-7 PRELIMINARY UTILITY PLAN
C-8 PRELIMINARY STORM WATER CONTROL PLAN
C-9 FIRE DEPARTMENT ACCESS PLAN
PA110 FLOOR PLAN 1
PA120 FLOOR PLAN 2
PA130 FLOOR PLAN 3
PA140 FLOOR PLAN 4
PA150 FLOOR PLAN 5
PA200 EXTERIOR ELEVATIONS - BUILDING A
PA201 EXTERIOR ELEVATIONS - BUILDING A
PA202 EXTERIOR ELEVATIONS - BUILDING A
PA203 EXTERIOR ELEVATIONS - BUILDING B
PA204 EXTERIOR ELEVATIONS - BUILDING B
PA300 EXTERIOR MATERIALS & IMAGES
L1.0 SCHEMATIC LANDSCAPE PLAN

BSB DESIGN
970 West 190th Street Suite 250
Torrance, CA 90502
t. 310. 217. 8885 f. 310. 217. 0425
APPLICANT: No. MS-230151.00
LEPAKSHI HOMES 6781 THORNTON AVE. NEWARK, CALIFORNIA 94560 2024 AUGUST 6
1481 PERALTA BLVD. FERMONT, CA 94536 t. 408.420.2268

LEPAKSHI HOMES

PROJECT SITE INFORMATION

BUILDING A

SITE SUMMARY
GROSS LOT AREA: 1.009 ACRES, 43,976 S.F.

BUILDING A SHALL BE FULLY SPRINKLED VIA NFPA 13

NUMBER OF UNITS NEWARK PARKING REQ'D TOTAL REQ'D OT MIN PARKING REQ'D OT MAX PARKING ALLOWED MIN-MAX PARKING REQ'D 1 BEDROOM UNIT: 15 UNITS 1.25 STALSS PER UNIT 19 STALLS 1.25 STALLS PER UNIT 2 STALLS PER UNIT 19-30 STALLS 2 BEDROOM UNIT: 34 UNITS 2 STALLS PER UNIT 68 STALLS 1.25 STALLS PER UNIT 2 STALLS PER UNIT 43-68 STALLS 3 BEDROOM UNIT: 3 UNIT 2 STALLS PER UNIT 6 STALLS 1.25 STALLS PER UNIT 2 STALLS PER UNIT 4- 6 STALLS TOWNHOUSE UNIT: 5 UNITS 2 STALLS PER UNIT 10 STALLS 1.25 STALLS PER UNIT 2 STALLS PER UNIT 7-10 STALLS GUEST PARKING 1 PLUS 1 STALL PER 4 UNITS 15 STALLS NONE REQ'D 1 PLUS 1 STALL PER 4 UNITS 0-15 STALLS TOTAL 60 UNITS 77-135 STALLS
PARKING PROVIDED: 125 STALLS;

PARKING GARAGE SHALL BE MECHANICALLY VENTILATED

BUILDING B

SITE SUMMARY
GROSS LOT AREA: .247 ACRES, 10,770 S.F.

BUILDING B SHALL BE FULLY SPRINKLED VIA NFPA 13

NUMBER OF UNITS NEWARK PARKING REQ'D TOTAL REQ'D OT MIN PARKING REQ'D OT MAX PARKING ALLOWED MIN-MAX PARKING REQ'D 1 BEDROOM UNIT: 12 UNITS 1.25 STALLS PER UNIT 15 STALLS 1.25 STALLS PER UNIT 2 STALLS PER UNIT 15-24 STALLS 2 BEDROOM UNIT: 12 UNITS 2 STALLS PER UNIT 24 STALLS 1.25 STALLS PER UNIT 2 STALLS PER UNIT 15-24 STALLS 3 BEDROOM UNIT: 4 UNITS 2 STALLS PER UNIT 8 STALLS 1.25 STALLS PER UNIT 2 STALLS PER UNIT 5- 8 STALLS GUEST PARKING 1 PLUS 1 STALL PER 4 UNITS 7 STALLS NONE REQURIED 1 PLUS 1 STALL PER 4 UNITS 0- 7 STALLS TOTAL 28 UNITS 35-63 STALLS
PARKING PROVIDED: 13 STALLS - (22 REMAINING STALLS WILL PARK IN BUILIDNG A)

PARKING GARAGE SHALL BE MECHANICALLY VENTILATED
PA100

COVER & PROJECT INFORMATION
LONG TERM BICYCLE RACK PROVIDED: 60 RACKS (@ 1 RACK PER UNIT) LONG TERM BICYCLE RACK PROVIDED: 28 RACKS (@ 1 RACK PER UNIT) 88 LONG TERM WALL MOUNT BICYCLE RACK LOCATED WITHIN BUILDING 'A' GARAGE 7 SHORT TERM BICYCLE RACK LOCATED ALONG BUILDING FRONTAGE 4 BEDROOM UNIT: 3 UNIT 2 STALLS PER UNIT 6 STALLS 1.25 STALLS PER UNIT 2 STALLS PER UNIT 4- 6 STALLS

LOCATED IN BUILDING 'A'

PODIUM COMMON OPEN SPACE

INDOOR COMMON OPEN SPACE

PRIVATE DECKS
8,000 SF
3,570 SF
4,290 SF
TOTAL OPEN SPACE 15,860 SF

PODIUM COMMON OPEN SPACE

INDOOR COMMON OPEN SPACE

PRIVATE DECKS
- SF
- SF
1,960 SF
TOTAL OPEN SPACE 1,960 SF
TOTAL 11 UNITS - 9-1BR AND 2-2BR UNITS ARE ALLOCATED AS A BMR UNITS AND SHALL BE SAME UNIT TYPE AS A TYPICAL 1BR AND 2 BR UNITS PROVIDED IN THE PROJECT 2 - 1BR UNIT ARE ALLOCATED AS A BMR UNITS AND SHALL BE SAME UNIT TYPE AS A TYPICAL 1BR UNITS PROVIDED IN THE PROJECT

PROJECT SUMMARY
ADDRESS: THORNTON AVENUE & OLIVE STREET, NEWARK, CALIFORNIA EXISTING ZONING: COMMERCIAL MIXED USE (CMU)

BUILDING SETBACK
FRONT 0 FEET
SIDE ADJACENT TO RS 20 FEET
SIDE 0 FEET
REAR 0 FEET

DEVELOPMENT CRITERIA OLD TOWN NEWARK SPECIFIC PLAN PROPOSED PLAN DENSITY 100 DWELLING UNITS PER ACRE 70 UNITS PER ACRE
TOTAL UNITS 125 DWELLING UNITS MAX. 88 UNITS
BUILDING HEIGHT 75 FEET MAX. BUILDING: 61 FEET, CLOCKTOWER: 68'-6" FEET NUMBER OF STORIES BUILING A - 3 STORY TYPE V-A O/ 2 STORY TYPE I-A BUILDING B - 4 STORY TYPE V-A O/ 1 STORY TYPE I-A
GROSS LOT AREA: 1.257 ACRES, 54,746 S.F.

N/A

BUILDING B BUILDING A
PA101 SHADE AND SHADOW STUDY
Packet Page No. 1562

BSB DESIGN
970 West 190th Street Suite 250
Torrance, CA 90502
t. 310. 217. 8885 f. 310. 217. 0425
APPLICANT: No. MS-230151.00
LEPAKSHI HOMES 6781 THORNTON AVE. NEWARK, CALIFORNIA 94560 2024 AUGUST 6
1481 PERALTA BLVD. FERMONT, CA 94536 t. 408.420.2268

LEPAKSHI HOMES
PA101

SHADE AND SHADOW STUDY
Packet Page No. 1563
12'-0"

ADJACENT TO WALL
9'-0"

TYPICAL
8'-6"
COMPACT 19'-0" TYPICAL 16'-0" COMPACT
19'-0"
TYPICAL 3'-0" 5'-0"

BUILDING A
(59) PARKING STALLS

BUILDING B
(13) PARKING STALLS
PA110 SCALE : 1/8" = 1'-0"
2 PARKING DETAILS

BSB DESIGN
970 West 190th Street Suite 250
Torrance, CA 90502
t. 310. 217. 8885 f. 310. 217. 0425
APPLICANT: No. MS-230151.00
LEPAKSHI HOMES 6781 THORNTON AVE. NEWARK, CALIFORNIA 94560 2024 AUGUST 6
1481 PERALTA BLVD. FERMONT, CA 94536 t. 408.420.2268

LEPAKSHI HOMES
PA110
LEVEL 01 FLOOR PLAN
1 2
3 FIRE DEPARTMENT ACCESS

ELECTRICAL TRANSFORMER

WASTE, RECYCLE & COMPOST

BINS IN TRASH ENCLOSURE
4 EXIT STAIR CASE
5 ELEVATOR
6 STREET PARKING
7 MECHANICALLY EXHAUSTED

PARKING GARAGE
8 MAILBOX & PARCEL

LOCKER CONCIERGE
9 PLANTER BOX RE: LANDSCAPING
10 8 FOOT TALL PRIVACY FENCE
11 SHORT TERM BIKE RACK (7 TOTAL)
12 PROPERTY LINE RE: CIVIL
0 4 8 16 32
scale: 1/16" = 1'-0" N 20'-0" SETBACK ADJACENT TO RS ZONING 20'-0" SETBACK ADJACENT TO RS ZONING

INDICATES ACCESSIBLE PATH
PA110 SCALE : 1/8" = 1'-0"
3 TRASH ROOMS
16'-4" 12'-0
3 4
"
10'-9
1 4
" 11'-11
1 4
"

WALL MOUNTED BICYCLE RACK
WHEEL STOP 13'-8
34 "
14'-10
3 4
" RECYCLE
4 YD

LANDFILL
8 YD

COMPOST
LANDFILL 4 YD
8 YD

RECYCLE
4 YD

COMPOST
4 YD 9'-0" TYP.

1. 2.

GENERAL NOTES
BUILDINGS WILL BE EQUIPPED WITH AN NFPA 13 FIRE
SPRINKLER SYSTEM AND FIRE ALARM SYSTEM. THIS
IS TO INCLUDE THE TRASH ENCLOSURE. STANDPIPES

SHALL BE PROVIDED IN THE STAIRS AND PARKING
STRUCTURE.

DEFERRED SUBMITTALS SHALL INCLUDE BUT NOT

LIMITED TO AUTOMATIC FIRE SPRINKLER SYSTEM, FIRE

ALARM SYSTEM, PRIVATE FIRE MAIN SYSTEMS,

EMERGENCY RESPONDER RADIO COMMUNICATION

SYSTEMS, AND COMMUNITY SAFETY CAMERA
SYSTEMS.
10 3

COMPACT

COMPACT

COMPACT COMPACT

COMPACT

COMPACT

COMPACT

COMPACT

COMPACT
10 12
PA201
1 PA202
2 PA200
1 PA203
2 PA204
1 PA203
1 PA204
2 PA202
1 2
VAN
16'-0" 25'-0"
19'-0" 147'-3"

COMMERCIAL
1,620 SF STAIR
STAIR
STAIR
STAIR
HVAC &
MECH.

SPACES
TRASH
ENCL.

GATED

VEHICULAR

ENTRANCE
GATED

VEHICULAR

ENTRANCE

VEHICULAR
GATE
'EXIT ONLY'
4 5
7 1 4
8 HIGHEST POINT
-62'-0" ABOVE GRADE

HIGHEST POINT
-58'-0" ABOVE GRADE 8'-6"
10 12
2 SLOPE DOWN AT 4.75%
ELECT.

ROOM
HVAC &
MECH.

SPACE

STORAGE

STORAGE

ELEVATOR
LOBBY

ELEVATOR
LOBBY
ELEV.

MACH.

ROOM
ELEV.

MACH.

ROOM
TRASH
ENCL.

VAN
VAN

VAN COMPACT COMPACT
GRADE
LEVEL

PARKING
1BR + DEN
940 SF
1BR + DEN
940 SF
1BR + DEN
940 SF
1BR + DEN
940 SF
2BR + DEN
1,508 SF
7 -7'-0" BELOW
GRADE
LEVEL

PARKING
3 3
1 4
11 8
5 5
1 4 3'-0" 2'-6"
AWNING
METAL
CANOPY
AWNING
METAL
CANOPY
2'-6"
3'-0" 126'-4"
273'-8"
21 5
17 14
2 WALL MOUNTED BICYCLE RACKS TYP. (1 PER UNIT - 88 TOTAL) SEE DETAIL 2 / PA120 FOR MORE INFORMATION

CONVEX SAFETY

MIRROR AND

PARKING VOICE

ALERT AND EXIT

LIGHT FOR THE

ADDITIONAL SAFETY

FOR THE

PEDESTRIAN
11 LANDSCAPE
AMENITY AREA 25'-0" 25'-0"
27'-5"
23'-0"
9'-0" 19'-0"
UP
LOWEST POINT -24'-0" ABOVE GRADE
HIGHEST POINT -68'-6" ABOVE GRADE
26'-4" 61'-4"
23'-4"

3. THE PROPOSED DEVELOPMENT SHOULD COMPLY

WITH THE CITY OF NEWARK STREET NUMBERING

SYSTEM AND TIE IN WITH THE EXISTING AREA STREET
NUMBERING.

ADDITIONALLY, THE PROPOSED BUILDINGS SHOULD

DISPLAY THE STREET ADDRESS IN A MANNER

CLEARLY VISIBLE FROM THE ADJACENT ROADWAY

AND PARKING AREAS IN ORDER
TO FACILITATE PUBLIC SAFETY PERSONNEL’S ABILITY

TO QUICKLY IDENTIFY ITS LOCATION DURING
EMERGENCY RESPONSES.

CONVEX SAFETY
MIRROR

A PARKING ZONE PRODUCT,

WALL MOUNTED

SELF-CONTAINED WARMING

SYSTEM SHALL BE ADDED TO

PROVIDE VOICE ALERT AND

EXIT LIGHTING WARNINGS
SEE PA203 FOR MORE

INFORMATION
Packet Page No. 1564

BUILDING A
(66) PARKING STALLS
(5) TOWNHOUSE UNITS

BUILDING B
(3) 1 BEDROOMS UNITS
(3) 2 BEDROOM UNITS
(1) 3 BEDROOM UNITS
PA120 SCALE : 1/2" = 1'-0"
2 Bike Rack
0 4 8 16 32
scale: 1/16" = 1'-0" N

BSB DESIGN
970 West 190th Street Suite 250
Torrance, CA 90502
t. 310. 217. 8885 f. 310. 217. 0425
APPLICANT: No. MS-230151.00
LEPAKSHI HOMES 6781 THORNTON AVE. NEWARK, CALIFORNIA 94560 2024 AUGUST 6
1481 PERALTA BLVD. FERMONT, CA 94536 t. 408.420.2268

LEPAKSHI HOMES
PA120
LEVEL 02 FLOOR PLAN

FIRE DEPARTMENT ACCESS

ELECTRICAL TRANSFORMER

EXIT STAIR CASE

ELEVATOR

STREET PARKING

MECHANICALLY EXHAUSTED

PARKING GARAGE

MAILBOX & PARCEL

LOCKER CONCIERGE
PLANTER BOX RE: LANDSCAPING
8 FOOT TALL PRIVACY FENCE

BIKE RACK
PROPERTY LINE RE: CIVIL 20'-0" SETBACK ADJACENT TO RS ZONING 20'-0" SETBACK ADJACENT TO RS ZONING EV
EV

INDICATES ACCESSIBLE PATH

ADDITIONAL NOTE

FIRE EXTINGUISHERS WILL BE REQUIRED IN COMMON
AREAS
MORE THAN ONE KNOX BOX MAY BE REQUIRED.

UNDERGROUND PARKING SHALL BE PROVIDED WITH

NATURAL VENTILATION OR MECHANICAL EXHAUST WITH
CO DETECTION.

NFPA 13 AUTOMATIC FIRE SPRINKLER AND FIRE ALARM
SYSTEMS WILL BE REQUIRED. AUTOMATIC FIRE

SPRINKLER PROTECTION SHALL BE PROVIDED FOR THE
TRASH ENCLOSURES. STANDPIPES SHALL BE PROVIDED
IN THE STAIRS AND PARKING STRUCTURE. PLEASE
PROVIDE SUCH NOTE ON PLAN.

AN EMERGENCY RESPONDER RADIO COMMUNICATION

SYSTEM (ERRCS) WILL BE REQUIRED FOR EACH
BUILDING.

POLICE NOTE

THE DEVELOPMENT SHALL COMPLY WITH CHAPTER

15.06, SECURITY CODE, OF THE NEWARK MUNICIPAL
CODE AND SECTION 510, EMERGENCY RESPONDER

RADIO COVERAGE, OF THE CALIFORNIA FIRE CODE

INDIVIDUAL UNIT NUMBERING SHOULD BE IN A

SYSTEMATIC METHOD, SPECIFIC TO EACH FLOOR AND
EACH UNIT IN A NON‐REPEATING MANNER (I.E. NO

TWO UNITS IN THE DEVELOPMENT WITH THE SAME
UNIT NUMBER). MAPS WITH UNIT NUMBERING OF

THE ENTIRE DEVELOPMENT SHOULD BE PLACED IN

EASY TO FIND LOCATIONS (PREFERABLY AT

ENTRANCES TO THE DEVELOPMENT AND THE

BUILDINGS) IN ORDER TO AID PUBLIC SAFETY
PERSONNEL’S ABILITY TO IDENTIFY SPECIFIC UNITS
DURING EMERGENCY RESPONSES.

THE PROPOSED DEVELOPMENT SHOULD COMPLY

WITH THE CITY OF NEWARK STREET NUMBERING

SYSTEM AND TIE IN WITH THE EXISTING AREA STREET
NUMBERING.

ADDITIONALLY, THE PROPOSED BUILDINGS SHOULD

DISPLAY THE STREET ADDRESS IN A MANNER

CLEARLY VISIBLE FROM THE ADJACENT ROADWAY

AND PARKING AREAS IN ORDER TO FACILITATE PUBLIC
SAFETY PERSONNEL’S ABILITY TO QUICKLY IDENTIFY
ITS LOCATION DURING EMERGENCY RESPONSES.
1 2
3 4
5 6
7 8
9 10
11 12
4 5
1 4
3 TRASH CHUTE
12 PA201
1 PA202
2 PA200
1 PA203
2 PA204
1 PA203
1 PA204
2 PA202
1 12 COMPACT COMPACT
24 4
15 18
5 COMPACT COMPACT COMPACT

EV EV EV EV
VAN
VAN
VAN
VAN
SLOPE DOWN AT 4.75%
5'-0" ABOVE
GRADE
LEVEL

PARKING
WALL MOUNTED BICYCLE RACKS TYP. (1 PER UNIT - 88 TOTAL) SEE DETAIL 2 / PA120 FOR MORE INFORMATION
SLOPE UP AT 4.75%

SECOND FLOOR PARKING
+ 12'-0"
EV CHARGER TYP.

STAIR
STAIR

ELEVATOR
LOBBY 1 4
5 5
1 4

ELEVATOR
LOBBY
3 25'-0"
23'-0"
9'-0" 19'-0" 25'-0" 19'-0" 19'-0"
LIGHT
DN
1BR + DEN
940 SF
1BR + DEN
940 SF
1BR + DEN
940 SF
1BR + DEN
940 SF
2BR + DEN
1,508 SF

AMENITY
870 SF
3 BEDROOM
1,299 SF
2 BEDROOM
952 SF
2 BEDROOM
952 SF
2 BEDROOM
952 SF
1 BEDROOM
602 SF
1 BEDROOM
602 SF
1 BEDROOM
602 SF PATIO PATIO PATIO PATIO PATIO PATIO PATIO

PATIO PATIO PATIO PATIO PATIO
27'-5"
7 24'-8"
34'-10"
Packet Page No. 1565

BSB DESIGN
970 West 190th Street Suite 250
Torrance, CA 90502
t. 310. 217. 8885 f. 310. 217. 0425
APPLICANT: No. MS-230151.00
LEPAKSHI HOMES 6781 THORNTON AVE. NEWARK, CALIFORNIA 94560 2024 AUGUST 6
1481 PERALTA BLVD. FERMONT, CA 94536 t. 408.420.2268

LEPAKSHI HOMES
LEVEL 03 FLOOR PLAN
0 4 8 16 32
scale: 1/16" = 1'-0" N
PA130

FIRE DEPARTMENT ACCESS

ELECTRICAL TRANSFORMER

EXIT STAIR CASE

ELEVATOR

STREET PARKING

MECHANICALLY EXHAUSTED

PARKING GARAGE

MAILBOX & PARCEL

LOCKER CONCIERGE
PLANTER BOX RE: LANDSCAPING
8 FOOT TALL PRIVACY FENCE

BIKE RACK
PROPERTY LINE RE: CIVIL
1 2
3 4
5 6
7 8
9 10
11 12

TRASH CHUTE
PA201
1 PA202
2 PA200
1 PA203
2 PA204
1 PA203
1 PA204
2 PA202
1 4
5 1 4
3 PATIO PATIO PATIO PATIO PATIO PATIO PATIO PATIO PATIO PATIO PATIO PATIO PATIO PATIO

PATIO PATIO PATIO PATIO PATIO PATIO
PATIO
PATIO
PATIO
PATIO
PATIO
PATIO

COMMUNITY
ROOM
1,350 SF
1 4
5 1
4 3
5 ELEVATOR
LOBBY

ELEVATOR
LOBBY
IDF
IDF
STOR. STOR.

BUILDING B BUILDING A
(3) 1 BEDROOMS UNITS
(3) 2 BEDROOM UNITS
(1) 3 BEDROOM UNITS
(5) 1 BEDROOMS UNITS
(11) 2 BEDROOM UNITS
(1) 3 BEDROOM UNITS
(1) 4 BEDROOM UNITS
3 BEDROOM
1,299 SF
2 BEDROOM
952 SF
2 BEDROOM
952 SF
2 BEDROOM
952 SF
1 BEDROOM
602 SF
1 BEDROOM
602 SF
1 BEDROOM
602 SF
2 BEDROOM
952 SF
2 BEDROOM
952 SF
2 BEDROOM
952 SF
2 BEDROOM
952 SF
1 BEDROOM
602 SF
4 BEDROOM
1,480 SF
2 BEDROOM
952 SF
2 BEDROOM
952 SF
2 BEDROOM
952 SF
2 BEDROOM
952 SF
2 BEDROOM
952 SF
3 BEDROOM
1,255 SF
2 BEDROOM
952 SF
2 BEDROOM
952 SF
1 BEDROOM
698 SF
1 BEDROOM
698 SF
1 BEDROOM
698 SF
1 BEDROOM
698 SF 35'-1"
39'-0" 52'-9
1 2
" 148'-8" 60'-9
1 2
"

PODIUM OPEN
SPACE
±8,000 SF
Packet Page No. 1566

BSB DESIGN
970 West 190th Street Suite 250
Torrance, CA 90502
t. 310. 217. 8885 f. 310. 217. 0425
APPLICANT: No. MS-230151.00
LEPAKSHI HOMES 6781 THORNTON AVE. NEWARK, CALIFORNIA 94560 2024 AUGUST 6
1481 PERALTA BLVD. FERMONT, CA 94536 t. 408.420.2268

LEPAKSHI HOMES
PA140
LEVEL 04 FLOOR PLAN
0 4 8 16 32
scale: 1/16" = 1'-0" N

FIRE DEPARTMENT ACCESS

ELECTRICAL TRANSFORMER

EXIT STAIR CASE

ELEVATOR

STREET PARKING

MECHANICALLY EXHAUSTED

PARKING GARAGE

MAILBOX & PARCEL

LOCKER CONCIERGE
PLANTER BOX RE: LANDSCAPING
8 FOOT TALL PRIVACY FENCE

BIKE RACK
PROPERTY LINE RE: CIVIL
1 2
3 4
5 6
7 8
9 10
11 12

TRASH CHUTE
PA201
1 PA202
2 PA200
1 PA203
2 PA204
1 PA203
1 PA204
2 PA202
1 BUILDING B BUILDING A
(3) 1 BEDROOMS UNITS
(3) 2 BEDROOM UNITS
(1) 3 BEDROOM UNITS
(5) 1 BEDROOMS UNITS
(11) 2 BEDROOM UNITS
(1) 3 BEDROOM UNITS
(1) 4 BEDROOM UNITS
4 5
1 4
3 PATIO PATIO PATIO PATIO PATIO PATIO PATIO PATIO PATIO PATIO PATIO PATIO PATIO PATIO

PATIO PATIO PATIO PATIO PATIO PATIO
PATIO
PATIO
PATIO
PATIO
PATIO
PATIO

COMMUNITY
ROOM
1,350 SF
1 4
5 1
4 3
5 ELEVATOR
LOBBY

ELEVATOR
LOBBY
IDF
IDF
STOR. STOR.
3 BEDROOM
1,299 SF
2 BEDROOM
952 SF
2 BEDROOM
952 SF
2 BEDROOM
952 SF
1 BEDROOM
602 SF
1 BEDROOM
602 SF
1 BEDROOM
602 SF
2 BEDROOM
952 SF
2 BEDROOM
952 SF
2 BEDROOM
952 SF
2 BEDROOM
952 SF
1 BEDROOM
602 SF
4 BEDROOM
1,480 SF
2 BEDROOM
952 SF
2 BEDROOM
952 SF
2 BEDROOM
952 SF
2 BEDROOM
952 SF
2 BEDROOM
952 SF
3 BEDROOM
1,255 SF
2 BEDROOM
952 SF
2 BEDROOM
952 SF
1 BEDROOM
698 SF
1 BEDROOM
698 SF
1 BEDROOM
698 SF
1 BEDROOM
698 SF
Packet Page No. 1567

BSB DESIGN
970 West 190th Street Suite 250
Torrance, CA 90502
t. 310. 217. 8885 f. 310. 217. 0425
APPLICANT: No. MS-230151.00
LEPAKSHI HOMES 6781 THORNTON AVE. NEWARK, CALIFORNIA 94560 2024 AUGUST 6
1481 PERALTA BLVD. FERMONT, CA 94536 t. 408.420.2268

LEPAKSHI HOMES
PA150
LEVEL 05 FLOOR PLAN
0 4 8 16 32
scale: 1/16" = 1'-0" N

FIRE DEPARTMENT ACCESS

ELECTRICAL TRANSFORMER

EXIT STAIR CASE

ELEVATOR

STREET PARKING

MECHANICALLY EXHAUSTED

PARKING GARAGE

MAILBOX & PARCEL

LOCKER CONCIERGE
PLANTER BOX RE: LANDSCAPING
8 FOOT TALL PRIVACY FENCE

BIKE RACK
PROPERTY LINE RE: CIVIL
1 2
3 4
5 6
7 8
9 10
11 12

TRASH CHUTE
PA201
1 PA202
2 PA200
1 PA203
2 PA204
1 PA203
1 PA204
2 PA202
1 BUILDING B BUILDING A
(3) 1 BEDROOMS UNITS
(3) 2 BEDROOM UNITS
(1) 3 BEDROOM UNITS
(5) 1 BEDROOMS UNITS
(12) 2 BEDROOM UNITS
(1) 3 BEDROOM UNITS
(1) 4 BEDROOM UNITS
4 5
1 4
3 PATIO PATIO PATIO PATIO PATIO PATIO PATIO PATIO PATIO PATIO PATIO PATIO PATIO PATIO

PATIO PATIO PATIO PATIO PATIO PATIO
PATIO
PATIO
PATIO
PATIO
PATIO
PATIO
2 BEDROOM
952 SF
2 BEDROOM
952 SF
2 BEDROOM
952 SF
2 BEDROOM
952 SF
1 BEDROOM
602 SF
4 BEDROOM
1,480 SF
2 BEDROOM
952 SF
2 BEDROOM
952 SF
2 BEDROOM
952 SF
2 BEDROOM
952 SF
2 BEDROOM
952 SF
3 BEDROOM
1,255 SF
2 BEDROOM
952 SF
2 BEDROOM
952 SF
1 BEDROOM
698 SF
1 BEDROOM
698 SF
1 BEDROOM
698 SF
1 BEDROOM
698 SF
1 4
5 1
4 3
5 ELEVATOR
LOBBY

ELEVATOR
LOBBY
IDF
IDF
STOR. STOR.
2 BEDROOM
1,135 SF
PATIO
3 BEDROOM
1,299 SF
2 BEDROOM
952 SF
2 BEDROOM
952 SF
2 BEDROOM
952 SF
1 BEDROOM
602 SF
1 BEDROOM
602 SF
1 BEDROOM
602 SF
Packet Page No. 1568
LEVEL 01
100' - 0"
LEVEL 02
112' - 0"
T.O. BLDG A PODIUM
LEVEL 03
120' - 3"
LEVEL 04
130' - 6"
LEVEL 05
140' - 9"

BLDG A ROOF LEVEL
152' - 0"

BLDG A BELOW GRADE PKG
93' - 0"

BLDG A PEAK
168' - 6"
PA200 SCALE : 3/32" = 1'-0"
1 BUILDING A - FRONT ELEVATION

BSB DESIGN
970 West 190th Street Suite 250
Torrance, CA 90502
t. 310. 217. 8885 f. 310. 217. 0425
APPLICANT: No. MS-230151.00
LEPAKSHI HOMES 6781 THORNTON AVE. NEWARK, CALIFORNIA 94560 2024 AUGUST 6
1481 PERALTA BLVD. FERMONT, CA 94536 t. 408.420.2268

LEPAKSHI HOMES
PA200

EXTERIOR ELEVATIONS - BUILDING A
0 5 10 20 30
scale: 3/32" = 1'-0"

EXTERIOR MATERIAL LEGEND
EXTERIOR CEMENT STUCCO - BEIGE 1
EXTERIOR CEMENT STUCCO - BEIGE 2
EXTERIOR CEMENT STUCCO - GREY 1

SPANISH ROOF TILE

PAINTED WOOD
1 2
3 4
5 6
7 8
9 10
11 12
13 14
3" RECESSED DUAL GRAZED VINYL WINDOW

STOREFRONT WINDOW / DOOR

SCREED LINE

METAL CANOPY

FABRIC AWNING

PAINTED METAL RAILING / GUARDRAIL

PAINTED WOOD RAFTER / TRELLIS

PROJECTING PAINTED FOAM TRIM / BELLY BAND

METAL GRILL OPENING AND GARAGE DOOR
15 DECORATIVE TERRA COTTA TILES
16 PAINTED FOAM SHUTTER
17 TINTED GLAZING AT GROUND LEVEL
18 MOVABLE PLANTER POT
1 2
3 6 3 4 5
7 8 7
9 10 11
13 12 12
13 13 14 14 12'-0" 10'-6" 10'-3" 10'-3" 11'-3" 22'-6" (TYPE I) 46'-0" (TYPE V) 68'-6" (PROPOSED BUILDING HEIGHT)15 16 18 17
Packet Page No. 1569
LEVEL 01
100' - 0"
LEVEL 02
112' - 0"
T.O. BLDG A PODIUM
LEVEL 03
120' - 3"
LEVEL 04
130' - 6"
LEVEL 05
140' - 9"

BLDG A ROOF LEVEL
152' - 0"

BLDG A BELOW GRADE PKG
93' - 0"

BLDG A PEAK
168' - 6"
PA201 SCALE : 3/32" = 1'-0"
1 BUILDING A - REAR ELEVATION

BSB DESIGN
970 West 190th Street Suite 250
Torrance, CA 90502
t. 310. 217. 8885 f. 310. 217. 0425
APPLICANT: No. MS-230151.00
LEPAKSHI HOMES 6781 THORNTON AVE. NEWARK, CALIFORNIA 94560 2024 AUGUST 6
1481 PERALTA BLVD. FERMONT, CA 94536 t. 408.420.2268

LEPAKSHI HOMES
PA201

EXTERIOR ELEVATIONS - BUILDING A
0 5 10 20 30
scale: 3/32" = 1'-0"

EXTERIOR MATERIAL LEGEND
EXTERIOR CEMENT STUCCO - BEIGE 1
EXTERIOR CEMENT STUCCO - BEIGE 2
EXTERIOR CEMENT STUCCO - GREY 1

SPANISH ROOF TILE

PAINTED WOOD
1 2
3 4
5 6
7 8
9 10
11 12
13 14
3" RECESSED DUAL GRAZED VINYL WINDOW

STOREFRONT WINDOW / DOOR

SCREED LINE

METAL CANOPY

FABRIC AWNING

PAINTED METAL RAILING / GUARDRAIL

PAINTED WOOD RAFTER / TRELLIS

PROJECTING PAINTED FOAM TRIM / BELLY BAND

METAL GRILL OPENING AND GARAGE DOOR
15 DECORATIVE TERRA COTTA TILES
16 PAINTED FOAM SHUTTER
17 TINTED GLAZING AT GROUND LEVEL
18 MOVABLE PLANTER POT
1 6 3 2 4 5
7 9
11 9 12 12
14 13 15 13
8 14 12'-0" 10'-6" 10'-3" 10'-3" 11'-3" 22'-6" (TYPE I) 46'-0" (TYPE V) 68'-6" (PROPOSED BUILDING HEIGHT) Packet Page No. 1570
LEVEL 01
100' - 0"
LEVEL 02
112' - 0"
T.O. BLDG A PODIUM
LEVEL 03
120' - 3"
LEVEL 04
130' - 6"
LEVEL 05
140' - 9"

BLDG A ROOF LEVEL
152' - 0"

BLDG A BELOW GRADE PKG
93' - 0"

BLDG A PEAK
168' - 6"
PA202 SCALE : 3/32" = 1'-0"
1 BUILDING A - SIDE ELEVATION 1

BSB DESIGN
970 West 190th Street Suite 250
Torrance, CA 90502
t. 310. 217. 8885 f. 310. 217. 0425
APPLICANT: No. MS-230151.00
LEPAKSHI HOMES 6781 THORNTON AVE. NEWARK, CALIFORNIA 94560 2024 AUGUST 6
1481 PERALTA BLVD. FERMONT, CA 94536 t. 408.420.2268

LEPAKSHI HOMES
PA202

EXTERIOR ELEVATIONS - BUILDING A
0 5 10 20 30
scale: 3/32" = 1'-0"

EXTERIOR MATERIAL LEGEND
EXTERIOR CEMENT STUCCO - BEIGE 1
EXTERIOR CEMENT STUCCO - BEIGE 2
EXTERIOR CEMENT STUCCO - GREY 1

SPANISH ROOF TILE

PAINTED WOOD
1 2
3 4
5 6
7 8
9 10
11 12
13 14
3" RECESSED DUAL GRAZED VINYL WINDOW

STOREFRONT WINDOW / DOOR

SCREED LINE

METAL CANOPY

FABRIC AWNING

PAINTED METAL RAILING / GUARDRAIL

PAINTED WOOD RAFTER / TRELLIS

PROJECTING PAINTED FOAM TRIM / BELLY BAND

METAL GRILL OPENING AND GARAGE DOOR
15 DECORATIVE TERRA COTTA TILES
16 PAINTED FOAM SHUTTER
17 TINTED GLAZING AT GROUND LEVEL
18 MOVABLE PLANTER POT
PA202 SCALE : 3/32" = 1'-0"
2 BUILDING A - SIDE ELEVATION 2
1 2
3 3 6 4 5
7 8 7
9 10 11
12 8
13 13 14
5 1 2 3 6 4
7 8 7
9 11 10
12 14 13 12'-0" 10'-6" 10'-3" 10'-3" 11'-3" 22'-6" (TYPE I) 46'-0" (TYPE V) 68'-6" (PROPOSED BUILDING HEIGHT)17 18 15 Packet Page No. 1571
LEVEL 01
100' - 0"
LEVEL 02
112' - 0"
T.O. BLDG A PODIUM
LEVEL 03
120' - 3"
LEVEL 04
130' - 6"
LEVEL 05
140' - 9"

BLDG A ROOF LEVEL
152' - 0"

BLDG A BELOW GRADE PKG
93' - 0"

BLDG A PEAK
168' - 6"
LEVEL 01
100' - 0"
LEVEL 02
112' - 0"
T.O. BLDG A PODIUM
LEVEL 03
120' - 3"
LEVEL 04
130' - 6"
LEVEL 05
140' - 9"

BLDG A ROOF LEVEL
152' - 0"

BLDG A BELOW GRADE PKG
93' - 0"

BLDG A PEAK
168' - 6"
PA202 SCALE : 3/32" = 1'-0"
1 BUILDING B - FRONT ELEVATION

BSB DESIGN
970 West 190th Street Suite 250
Torrance, CA 90502
t. 310. 217. 8885 f. 310. 217. 0425
APPLICANT: No. MS-230151.00
LEPAKSHI HOMES 6781 THORNTON AVE. NEWARK, CALIFORNIA 94560 2024 AUGUST 6
1481 PERALTA BLVD. FERMONT, CA 94536 t. 408.420.2268

LEPAKSHI HOMES
PA203

EXTERIOR ELEVATIONS - BUILDING B
0 5 10 20 30
scale: 3/32" = 1'-0"

EXTERIOR MATERIAL LEGEND
EXTERIOR CEMENT STUCCO - BEIGE 1
EXTERIOR CEMENT STUCCO - BEIGE 2
EXTERIOR CEMENT STUCCO - GREY 1

SPANISH ROOF TILE

PAINTED WOOD
1 2
3 4
5 6
7 8
9 10
11 12
13 14
3" RECESSED DUAL GRAZED VINYL WINDOW

STOREFRONT WINDOW / DOOR

SCREED LINE

METAL CANOPY

FABRIC AWNING

PAINTED METAL RAILING / GUARDRAIL

PAINTED WOOD RAFTER / TRELLIS

PROJECTING PAINTED FOAM TRIM / BELLY BAND

METAL GRILL OPENING AND GARAGE DOOR
15 DECORATIVE TERRA COTTA TILES
16 PAINTED FOAM SHUTTER
17 TINTED GLAZING AT GROUND LEVEL
18 MOVABLE PLANTER POT
PA202 SCALE : 3/32" = 1'-0"
2 BUILDING B - SIDE ELEVATION 1
1 6 2 3 5 4
8 7 7
9 10 11
13 12 12
13 13 14
4 5 6 2 3 1
7 7 8
9 10 11
8 12'-0" 10'-6" 10'-3" 10'-3" 11'-3" 22'-6" (TYPE I) 46'-0" (TYPE V) 12'-0" 10'-6" 10'-3" 10'-3" 11'-3" 22'-6" (TYPE I) 46'-0" (TYPE V) 13 16

A PARKING ZONE PRODUCT, WALL MOUNTED

SELF-CONTAINED WARMING SYSTEM
- SELF-CONTAINED WARNING SYSTEM
- WALL MOUNTED
- STANDARD SIGN MEASURES 48’’ X 10’’ X 8’’
- MADE FROM 14AWG STEEL
- HAMMERED COPPER POWDER COATING FINISH
- NEEDS 120VAC 1A OR 12VDC 5A POWER
- VOICE TIMER OPTION AVAILABLE
15 14
14 CONVEX SAFETY MIRROR
15 Packet Page No. 1572
LEVEL 01
100' - 0"
LEVEL 02
112' - 0"
T.O. BLDG A PODIUM
LEVEL 03
120' - 3"
LEVEL 04
130' - 6"
LEVEL 05
140' - 9"

BLDG A ROOF LEVEL
152' - 0"

BLDG A BELOW GRADE PKG
93' - 0"

BLDG A PEAK
168' - 6"
LEVEL 01
100' - 0"
LEVEL 02
112' - 0"
T.O. BLDG A PODIUM
LEVEL 03
120' - 3"
LEVEL 04
130' - 6"
LEVEL 05
140' - 9"

BLDG A ROOF LEVEL
152' - 0"

BLDG A BELOW GRADE PKG
93' - 0"

BLDG A PEAK
168' - 6"
PA202 SCALE : 3/32" = 1'-0"
1 BUILDING B - SIDE ELEVATION 2

BSB DESIGN
970 West 190th Street Suite 250
Torrance, CA 90502
t. 310. 217. 8885 f. 310. 217. 0425
APPLICANT: No. MS-230151.00
LEPAKSHI HOMES 6781 THORNTON AVE. NEWARK, CALIFORNIA 94560 2024 AUGUST 6
1481 PERALTA BLVD. FERMONT, CA 94536 t. 408.420.2268

LEPAKSHI HOMES
PA204

EXTERIOR ELEVATIONS - BUILDING B
0 5 10 20 30
scale: 3/32" = 1'-0"

EXTERIOR MATERIAL LEGEND
EXTERIOR CEMENT STUCCO - BEIGE 1
EXTERIOR CEMENT STUCCO - BEIGE 2
EXTERIOR CEMENT STUCCO - GREY 1

SPANISH ROOF TILE

PAINTED WOOD
1 2
3 4
5 6
7 8
9 10
11 12
13 14
3" RECESSED DUAL GRAZED VINYL WINDOW

STOREFRONT WINDOW / DOOR

SCREED LINE

METAL CANOPY

FABRIC AWNING

PAINTED METAL RAILING / GUARDRAIL

PAINTED WOOD RAFTER / TRELLIS

PROJECTING PAINTED FOAM TRIM / BELLY BAND

METAL GRILL OPENING AND GARAGE DOOR
15 DECORATIVE TERRA COTTA TILES
16 PAINTED FOAM SHUTTER
17 TINTED GLAZING AT GROUND LEVEL
18 MOVABLE PLANTER POT
PA202 SCALE : 3/32" = 1'-0"
2 BUILDING B - REAR ELEVATION 1
1 2
3 3 6 4 5
8 9
10 11 12 12
13 15 14 13
5 1 6 4
8 9
13 12'-0" 10'-6" 10'-3" 10'-3" 11'-3" 22'-6" (TYPE I) 46'-0" (TYPE V) 68'-6" (PROPOSED BUILDING HEIGHT) 12'-0" 10'-6" 10'-3" 10'-3" 11'-3" 22'-6" (TYPE I) 46'-0" (TYPE V) 68'-6" (PROPOSED BUILDING HEIGHT) Packet Page No. 1573

SIGN & BRACKET

SPANISH TILE

ENTRY BALCONY

SUN SHADES

PERGOLA

COLOR PALETTE

WINDOW DETAIL
CLOCK

BSB DESIGN
970 West 190th Street Suite 250
Torrance, CA 90502
t. 310. 217. 8885 f. 310. 217. 0425
APPLICANT: No. MS-230151.00
LEPAKSHI HOMES 6781 THORNTON AVE. NEWARK, CALIFORNIA 94560 2024 AUGUST 6
1481 PERALTA BLVD. FERMONT, CA 94536 t. 408.420.2268

LEPAKSHI HOMES
PA300

EXTERIOR MATERIALS & IMAGES

METAL GRILLE

STOREFRONT

METAL CANOPY
Packet Page No. 1574
Xref ..\..\..\..\..\MS230151.00.30 SD\MS230151.00.31-DWG\x-unit plan-LW_1-fp01-MS230151.dwg Xref ..\..\..\..\..\MS230151.00.30 SD\MS230151.00.31-DWG\x-unit plan-LW_1-fp01-MS230151.dwg Xref ..\..\..\..\..\MS230151.00.30 SD\MS230151.00.31-DWG\x-unit plan-LW_1-fp01-MS230151.dwg Xref ..\..\..\..\..\MS230151.00.30 SD\MS230151.00.31-DWG\x-unit plan-LW_1-fp01-MS230151.dwg Xref ..\..\..\..\..\MS230151.00.30 SD\MS230151.00.31-DWG\x-unit plan-LW_2-fp01-MS230151.dwg Xref ..\..\..\..\..\MS230151.00.30 SD\MS230151.00.31-DWG\x-Site_MS230151.dwg 9 NOT FOR

CONSTRUCTION
Packet Page No. 1575
SS
9 GAS

WSS SD NOT FOR

CONSTRUCTION
Packet Page No. 1576
9 NOT FOR

CONSTRUCTION
Packet Page No. 1577
THORNTON AVENUE - EAST OF OLIVE ST OLIVE STREET EXISTING THORNTON AVENUE - WEST OF OLIVE ST MULBERRY STREET FUTURE THORNTON AVENUE - WEST OF OLIVE ST PER OLD TOWN SPECIFIC PLAN THORNTON AVENUE - EAST OF OLIVE ST THORNTON AVENUE - EAST OF OLIVE ST OLIVE STREET - CUL DE SAC 9 THORNTON AVENUE SECTION FROM OLD TOWN SPECIFIC PLAN NOT FOR

CONSTRUCTION
Packet Page No. 1578
Xref ..\..\..\..\..\MS230151.00.30 SD\MS230151.00.31-DWG\x-unit plan-LW_1-fp01-MS230151.dwg Xref ..\..\..\..\..\MS230151.00.30 SD\MS230151.00.31-DWG\x-unit plan-LW_1-fp01-MS230151.dwg Xref ..\..\..\..\..\MS230151.00.30 SD\MS230151.00.31-DWG\x-unit plan-LW_1-fp01-MS230151.dwg Xref ..\..\..\..\..\MS230151.00.30 SD\MS230151.00.31-DWG\x-unit plan-LW_1-fp01-MS230151.dwg Xref ..\..\..\..\..\MS230151.00.30 SD\MS230151.00.31-DWG\x-unit plan-LW_2-fp01-MS230151.dwg Xref ..\..\..\..\..\MS230151.00.30 SD\MS230151.00.31-DWG\x-Site_MS230151.dwg 9 NOT FOR

CONSTRUCTION
Packet Page No. 1579
Xref ..\..\..\..\..\MS230151.00.30 SD\MS230151.00.31-DWG\x-unit plan-LW_1-fp01-MS230151.dwg Xref ..\..\..\..\..\MS230151.00.30 SD\MS230151.00.31-DWG\x-unit plan-LW_1-fp01-MS230151.dwg Xref ..\..\..\..\..\MS230151.00.30 SD\MS230151.00.31-DWG\x-unit plan-LW_1-fp01-MS230151.dwg Xref ..\..\..\..\..\MS230151.00.30 SD\MS230151.00.31-DWG\x-unit plan-LW_1-fp01-MS230151.dwg Xref ..\..\..\..\..\MS230151.00.30 SD\MS230151.00.31-DWG\x-unit plan-LW_2-fp01-MS230151.dwg Xref ..\..\..\..\..\MS230151.00.30 SD\MS230151.00.31-DWG\x-Site_MS230151.dwg SS CROSS SECTION OF BUILDING A 9 NOT FOR

CONSTRUCTION
Packet Page No. 1580
SS 9 NOT FOR

CONSTRUCTION
Packet Page No. 1581
Xref ..\..\..\..\..\MS230151.00.30 SD\MS230151.00.31-DWG\x-unit plan-LW_1-fp01-MS230151.dwg Xref ..\..\..\..\..\MS230151.00.30 SD\MS230151.00.31-DWG\x-unit plan-LW_1-fp01-MS230151.dwg Xref ..\..\..\..\..\MS230151.00.30 SD\MS230151.00.31-DWG\x-unit plan-LW_1-fp01-MS230151.dwg Xref ..\..\..\..\..\MS230151.00.30 SD\MS230151.00.31-DWG\x-unit plan-LW_1-fp01-MS230151.dwg Xref ..\..\..\..\..\MS230151.00.30 SD\MS230151.00.31-DWG\x-unit plan-LW_2-fp01-MS230151.dwg Xref ..\..\..\..\..\MS230151.00.30 SD\MS230151.00.31-DWG\x-Site_MS230151.dwg SS IMP 1 281 SF SELF RETAINING 3,085 SF IMP 2 42,792 SF IMP 1 10,989 SF SELF TREATING 1,177 SF IMP 2 1,130 SF 9 LEGEND DRAINAGE MANAGEMENT AREA DRAINAGE FLOW DIRECTION PROPOSED STORM DRAIN DMA 3 xx,xxx SF INTEGRATED MANAGEMENT DRAINAGE MANAGEMENT AREA/ FLOW-THROUGH PLANTER IMP 3 x,xxx SF BOUNDARY LIMITS PRACTICE AREA FLOW THROUGH PLANTER DETAIL IMP SIZING DMA 1 IMP SIZING DMA 2 PROJECT TO ACCOMMODATE HM REQUIREMENTS DURING IMPROVEMENT PLANS STAGE AS NECESSARY. MODIFICATIONS TO BASINS TO MEET HM REQUIREMENTS WILL INCLUDE ADJUSTMENT OF THE CLASS 2 SECTION DEPTH, HEIGHT OF INVERTS OF PIPES RELATED TO THE BASIN, ETC. MODIFICATIONS TO BE BASED OFF HYDROLOGY REPORT THAT WILL ACCOMMODATE IMPROVEMENT PLANS. MOSQUITO ABATEMENT REQUIREMENTS WILL BE MET PER DISTRICT REQUIREMENTS AND BASED ON FINAL DESIGN. NOT FOR

CONSTRUCTION
Packet Page No. 1582
Xref ..\..\..\..\..\MS230151.00.30 SD\MS230151.00.31-DWG\x-unit plan-LW_1-fp01-MS230151.dwg Xref ..\..\..\..\..\MS230151.00.30 SD\MS230151.00.31-DWG\x-unit plan-LW_1-fp01-MS230151.dwg Xref ..\..\..\..\..\MS230151.00.30 SD\MS230151.00.31-DWG\x-unit plan-LW_1-fp01-MS230151.dwg Xref ..\..\..\..\..\MS230151.00.30 SD\MS230151.00.31-DWG\x-unit plan-LW_1-fp01-MS230151.dwg Xref ..\..\..\..\..\MS230151.00.30 SD\MS230151.00.31-DWG\x-unit plan-LW_2-fp01-MS230151.dwg Xref ..\..\..\..\..\MS230151.00.30 SD\MS230151.00.31-DWG\x-Site_MS230151.dwg 9 NOT FOR

CONSTRUCTION
Packet Page No. 1583

BUS STOP

LOW SEAT
WALL

PLAZA SPACE AND
2 BENCHES
NO-MOW
TURF

SUBSTITUTE

SPACE FOR SMALL

BISTRO TABLES
(E) TREES IN

CONCRETE (E) TREE WELLS

MOW EDGES

EXISTING TREES

TO REMAIN

PARKWAY

UNDERLAIN
WITH

ATT, NO
TREES.

GROUND
COVERS
AND

ORNAMENTAL
GRASS
TO BE

INSTALLED

UTILITY

AREA TO
BE

PLANTED
AS

POSSIBLE

FLOW-THROUGH

PLANTER

MASONRY WALL ON

PROPERTY LINE

BIORETENTION

BASIN PLANTING
SCREEN

UTILITIES

ORNAMENTAL

STREET TREES

AND LOW

PARKWAY

PLANTING

THORNTON AVENUE

OLIVE STREET

MULBERRY STREET

PROPOSED BUILDING A

PROPOSED BUILDING B
2 EXISTING PALMS

RELOCATED

SIGHTLINE

SIGHTLINE, TYP
INTERIOR PROPERTY LINE = 307LF
16 TREES AND 48 SHRUBS REQUIRED
INCLUDING ITALIAN CYPRESS, 15
GINKGO, 20 ITALIAN CYPRESS TREES
AND 53 SHRUBS FURNISHED
(E) TREE

WELLS, TYP
2nd FLOOR PLAZA
ABOVE

MINERAL MULCH
SCREEN

UTILITIES
2nd FLOOR TREES

IN PLANTERS
SCREEN

UTILITIES

SYNTHETIC TURF
(CORNHOLE, BLUNT LAWN DARTS,

OTHER LAWN GAMES)

CONVERSATION AREA -

PLANTERS AND FURNISHINGS

RAISED PLANTER WITH

SEAT WALL

TABLE SEATING

PLANTERS,
TYP

PICKLEBALL
2 DATE PALMS TO

BE RELOCATED

OLIVE STREET CUL-DE-SAC

STREET TREES TO BE

RETAINED

OLIVE STREET PLAZA STREET

TREES TO BE REMOVED
(E) TREE NOT IMPACTED BY

NEW CONSTRUCTION

EXISTING STREET

TREES TO REMAIN
10" 13" 16" 13" 24" 13" 13" 12"
38" 37"
25"
13"
19"
21"
11"
16" 14"
23"
23"
11"
16" 23"
16"
Trunk Diameter
16"

TREE CALIPER

PER SURVEY
(E) STREET TREES

TO BE REPLACED

TREE TO BE RETAINED OR RELOCATED

TREE TO BE REMOVED

PLANT LEGEND
Landscape Architecture ● Planning
Lepakshi
Homes
113 N. Church Street Suite 307
Visalia, CA 93291
T: 559.733.3690
C: 559.786.2381
[email protected]
[email protected]
Designs, inc
of Sheets
Revision/Issued for:

Sierra
Professional Seal:
6781 Thornton Ave
Newark, CA
Sheet:

A Project For:

Sheet Title: SCHEMATIC LANDSCAPE DESIGN
SCALE 1" = 20'-0"

SCHEMATIC LANDSCAPE DESIGN - PODIUM ACTIVITY AREA
SCALE 1" = 10'-0"

EXISTING CONDITIONS
NTS
SEE CIVIL SHEET 2

SCHEMATIC

LANDSCAPE
PLAN
L1.0
1 Not for Construction

5.13.24 Packet Page No. 1584
City Council Meeting
September 12, 2024
Lepashki Homes
Packet Page No. 1585
Lepashki Homes
• On August 13th the Planning Commission approved the Design Review, Vesting Tentative Map and Density Bonus
• Action to consider an Alternate Means of Compliance allowing affordable housing units to be provided on-site in-lieu of paying a fee for the Lepashki Home project
2 Packet Page No. 1586
Project Proposal
• 88 units in two buildings
• 13 BMR units for low-income households
• 15,000 sf in private open space
• 125 parking spaces
• 1,620 sf of retail space
3 Packet Page No. 1587
Project Location
• Project located on Thornton Ave
between the terminus of Olive
Street and Mulberry St
• Currently consists of seven
parcels
• Three of the parcels contain a
single-family homes, while the
remaining four parcels are vacant
• Total site 1.25 acres
4 Packet Page No. 1588
Proposed Site Plan
• Site will be consolidated as
two lots separated by a small
green space
• Open space is public and will
be landscape as part of
Thornton Streetscape project
• Lot 1 - 1.01 acres
• Lot 2 - .25 acres
5 Packet Page No. 1589
General Plan and Zoning
• The General Plan land use designation for the site is Commercial Mixed Use (CMU)
• The site is zoned as Commercial Mixed Use
• The project is consistent with the density, height, parking, open space, and setback requirements of the zoning district. 6 Packet Page No. 1590
Old Town Newark Specific Plan
• Located on an
Opportunity Site
• Housing and affordable
units will support the
commercial core
• Project is consistent with
the goals and policies of
the OTNSP
7 Packet Page No. 1591
Design Review
• Design Review in accordance with NMC §17.34.060
• OTNSP encourages the concentration of more significant building massing and mixed-use buildings along Thornton Avenue. Building forms and massing then transition down in height to adjacent lower-scale existing neighborhoods.
• Staff worked with Larry Cannon of the Cannon Design Group to improve the architectural style and elements to ensure the project’s consistency with the OTNSP. Areas of focus included:
• Simplify and unify the facades
• Unify the corners of the overall design
• Variety to the top floor heights
• Enhanced pedestrian experience
• Projecting eaves and gable ends
• Addition of balconies
8 Packet Page No. 1592
9 Building A
Packet Page No. 1593
10 Building A
Packet Page No. 1594
11 Building A
Packet Page No. 1595
Building B 12
Packet Page No. 1596
Building B 13
Packet Page No. 1597
Building B 14
Packet Page No. 1598
Affordable Housing
Program
• Developers pay an impact fee or may provide onsite affordable subject to City Council approval • The developer is requesting to provide 13
affordable units in-lieu of paying the impact fee
• Approval of alternative means of compliance
needed
Affordable Housing Agreement
• Providing affordable units are subject to an
Affordable Housing Regulatory Agreement
established between the City and the residential
developer
• Establish the total affordable unit count and income
category distribution described
• Set the deed-restricted affordable duration (45 years) • Newark local preference and various other terms for
Lepakshi’s homes initial sale of the units.
• Individual buyers of the affordable units will be
required to enter into similar agreements at the time of purchase to ensure the units are used as affordable
housing.
• Equity sharing with City when units are sold
• Administered by City staff with consultant assistance 15 Packet Page No. 1599
Affordable Housing
BMR Units
• 13 Units for Low-Income Households (80%
of Low Income)
• 11 in Building B
• 2 in Building A
• Eleven 1-bedroom
• Two 2-bedroom units
• BMR Units shall be the same as typical
units provided in the project
16 Packet Page No. 1600
Affordable Housing Pricing
Program
• For one-bedroom units this
represents approximately
$294K, assuming a twoperson household
• For two-bedroom units this
represents approximately
$334K, assuming a threeperson household
17 Packet Page No. 1601
Item  F. 4.

DATE 09/12/2024
TO Honorable Mayor and City Council Members
FROM James Scanlin, Environmental Services Manager
SUBJECT    Status of the Newark Climate Action Plan Update project SUMMARY AND RECOMMENDATION
The City has a long history of being proactive in addressing the threat of climate change. In 2007, Mayor David W. Smith signed the U.S. Mayor's Climate Protection Agreement, thereby committing the City to taking action for climate protection. The City adopted a Climate Action Plan (CAP) in January 2010. The CAP set a target to reduce Greenhouse Gas (GHG) emissions from activities within the city to 1990 levels by 2020 (i.e., an approximately 15% reduction) which was in line with the State's target at that time.

Due to the increasing awareness of the threat of climate change, the State has adopted much more aggressive GHG reduction targets. The State's target is to reduce GHG emissions to 40% below 1990 levels by 2030 and achieve carbon neutrality by 2045.

The City seeks to align with the State’s updated GHG reduction targets and is preparing an update to the 2010 CAP. This update, titled Climate Action Newark (CAN), will provide the City with a plan to reduce GHG emissions from activities in Newark over the coming decades.

Staff recommends that the City Council receive an update on the status of Climate Action Newark as an update to the 2010 CAP.

BACKGROUND
Since the City’s 2010 CAP was adopted, the regulatory landscape of climate action has shifted toward dramatic decarbonization efforts. The State adopted a 2030 GHG reduction target of 40% below 1990 levels through Senate Bill (SB) 32, and Assembly Bill (AB) 1279 requires the State to achieve net zero GHG emissions as soon as possible but no later than 2045 and to reduce anthropogenic GHG emissions by 85 percent below 1990 levels by 2045. The California Air Resources Board’s (CARB’s) 2022 Scoping Plan for Achieving Carbon Neutrality lays out a pathway to achieving the AB 1279 targets. In addition, as the State implements GHG regulations that target new development (e.g., strengthening building energy efficiency standards), the opportunities for additional reductions from new development at the local level diminish.

These circumstances underscore the need to focus on actions within the City’s authority and influence to reduce emissions from the existing building stock and built Packet Page No. 1602
authority and influence to reduce emissions from the existing building stock and built environment (e.g., community and roadway design, energy systems, vehicle fueling and charging) to align with the State targets. Aligning with the State's targets will allow development projects to meet CEQA greenhouse gas emission requirements by incorporating the City's CAP measures.

Climate Action Newark (CAN) is a comprehensive strategy to mitigate the impacts of climate change and reduce GHG emissions. The guiding principles of CAN that will drive strategy development include the following:

Ambitious. The proposed strategies will be ambitious and serve to “move the needle” in reducing GHGs and support community resilience.

Realistic. While the proposed strategies will be ambitious, their implementation will be realistic and attainable, given local capacity.

Collaborative. Implementing the proposed strategies will require collaboration and involvement from multiple city departments, the broader community, and other stakeholders.

Comprehensive. The proposed strategies will span a range of sectors within the city and support broader regional initiatives.

Fair. The proposed strategies will enact solutions that equitably address the sources and risks of climate change and will share the costs and benefits of action across the city.

Beneficial. The proposed strategies aim to improve the city’s livability and the well-being of all community members.

Specific. The proposed strategies will be as specific as possible, either through the language of the strategies themselves and/or through a suite of later-determined implementation details. Implementation details may include lead and supporting actors, implementing mechanisms, and potential funding sources, among others. Additionally, proposed strategies will be locally relevant, deliver local benefits, and support local priorities.

Evidence-Based. The proposed strategies will reflect evidence-based knowledge and local understanding and be informed by empirical inputs (e.g., GHG inventory and forecasts).

Transparent. Following an open decision-making process, the implementation of proposed strategies will be tracked, reported on, and evaluated over time to determine any necessary updates or revisions to strategies.

Additionally, implementation of the actions that will be included in CAN will result in co-benefits. Co-benefits refer to the additional positive outcomes alongside the primary goal(s) of each strategy upon implementation, and they may manifest across various sectors, including environmental, social, economic, and public health domains. Specific co-benefits that will be evaluated for the strategies included in CAN include:

Improved Public Health: This may include, but is not limited to, reduced air pollution (e.g., through reducing vehicle miles traveled and transitioning to cleaner energy sources) and improved mental health (e.g., through access to clean and green spaces).

Community Cost Savings: This may include, but is not limited to, savings related to energy efficiency (e.g., lower energy bills), infrastructure resilience (e.g., avoidance of costly repairs for damages that would have happened otherwise), Packet Page No. 1603
and healthcare.

Environmental Quality: This may include, but is not limited to, biodiversity conservation, water conservation, and waste reduction.

Economic Development: This may include, but is not limited to, job creation (e.g., investments in renewable energy, sustainable agriculture, and green infrastructure resulting in economic growth and diversification), innovation and entrepreneurship, and recreation.

Equity: This may include, but is not limited to, social inclusion (e.g., addressing disparities, promoting greater access to resources), environmental justice (e.g., mitigating cumulative impacts from environmental stressors, fair distribution of environmental benefits), and economic empowerment.

Adaptation/Resilience: This may include, but is not limited to, improved infrastructure resilience, improved disaster preparedness, and enhanced community cohesion.

Resource Conservation: This may include, but is not limited to, sustainable resource management (e.g., preservation of natural resources, efficient use of resources).

Overall, CAN will be essential for mitigating climate change, safeguarding the environment, fostering economic growth, and improving the quality of life for current and future generations.

DISCUSSION/ANALYSIS
Staff has prepared an updated GHG emissions inventory for the year 2022 to serve as a baseline for Climate Action Newark. In addition, staff has prepared GHG emissions forecasts for the years 2030, 2035, 2040, and 2045 along with GHG reduction targets that align with the State’s adopted targets. The City’s targets represent the fair share of GHG emissions that should be reduced to align with SB 32 and AB 1279, accounting for the sources of emissions generated in Newark.
2005 and 2022 GHG Emissions Comparison
Staff compared the 2005 inventory prepared as part of the 2010 CAP with the updated 2022 inventory. This allows the City to measure progress since the 2010 CAP was adopted. It is important to note that the comparison between the two inventories includes only the emissions sectors that allowed for a side-by-side comparison. Due to a lack of available data or methodologies, the updated 2022 inventory provides additional emissions data for sectors not previously included in the 2010 CAP. The comparison between the two inventories is shown in Table 1 below. Emissions are presented in units of metric tons of carbon dioxide equivalent (MTCO2e).

Packet Page No. 1604
Table 1
Emissions Sector 2005 GHG Inventory
(MTCO2e)
2022 GHG Inventory
(MTCO2e)
Percent Change
(2005-2022)
Residential Building
Energy 47,313 45,530 -4%
Commercial Building
Energy 175,096 101,646 -42%
Transportation 192,841 206,749 +7%
Waste 18,607 10,974 -41%
Total 433,857 364,899 -16%
The 2020 target included in the 2010 CAP was to reduce emissions by 15% despite population and employment growth. A 2020 inventory was not completed as it would have shown anomalies due to the change in economics and behaviors associated with the COVID-19 pandemic. However, comparing the two inventories shows that the City was able to reduce emissions 16% below 2005 levels in 2022. 2022 GHG Emissions Inventory Results
The comprehensive 2022 GHG emissions inventory results are shown in Table 2 below (which includes additional emissions sectors not previously estimated in the 2010 inventory).

Table 2
Sector 2022 GHG Inventory
(MTCO2e) Percent of Total
On-Road Transportation 206,749 55%
Building Energy (Includes Residential and Nonresidential) 147,607 39% Off-Road Vehicles and Equipment 10,974 3%
Solid Waste 10,255 3%
Water Supply 1,188 <1%
Wastewater Treatment 552 <1%
Total 377,325 100%
GHG Emissions Forecasts
After completing the GHG emissions inventory, staff prepared the emissions forecast analysis. The purpose of GHG emissions forecast analysis is to estimate how GHG emissions may evolve in the future given changes in population and housing, economic growth, and how state and federal legislation may help to reduce local emissions. Two forecast scenarios were prepared in that provide an assessment of how emissions generated by activities will change over time: business-as-usual (BAU) forecast and legislative-adjusted BAU forecast. The BAU forecast represents future emissions without further state, federal, regional, or local action while accounting for the city’s population, employment, and land use change(s). This scenario is considered highly Packet Page No. 1605
conservative and unrealistic as it does not take into account known effects of current regulations on future emissions.

The legislative-adjusted BAU emissions forecasts uses the same demographic and VMT data that were used for the BAU forecasts, while also accounting for state and federal policies and regulations that would affect local emissions. For example, growth in residential building electricity consumption was scaled using housing units as the growth scaling factor, and a legislative reduction was applied to incorporate the California Code of Regulations, Title 24, Part 6 building energy efficiency standards for new development.

The GHG reductions considered in the legislative-adjusted BAU forecast fall generally into four categories: building energy efficiency standards, fuel efficiency standards, electric vehicle sales requirements, and renewable and zero-carbon electricity requirements. The primary drivers of the emissions reductions are the requirements of SB 100 and SB 1020 (carbon-free electricity), as well as increased electric vehicle penetration from the Advanced Clean Cars II regulation. These forecasts provide the City with a more robust understanding of future emissions to assist with the prioritization of emissions reduction measures developed to meet GHG targets. Table 3 below shows the results of the legislative-adjusted BAU forecast for Newark over several horizon years, comparing the results with the 2022 inventory.

Table 3
Sector 2022 2030 2035 2040 2045
On-Road Transportation  206,749  169,383  127,204  76,829  49,144 Building Energy  147,607  112,281  91,175  72,793  59,194 Off-Road Vehicles and
Equipment  10,974  9,720  9,617  9,982  10,403
Solid Waste  10,255  12,921  13,721  14,521  15,321
Water Supply  1,188  860  651  412  0
Wastewater Treatment  552  611  649  685  694
Total  377,325  308,801  245,114  176,412  135,078
Percent Change from 2022
Levels NA -18% -35% -53% -64%
Packet Page No. 1606
Figure 1 depicts the BAU and legislative-adjusted BAU forecasts, showing the impact of state, federal, and regional legislation on the City’s GHG emissions profile over time.

Figure 1
GHG Emissions Reduction Targets
As mentioned above, the City aims to reduce GHG emissions in proportion to the State’s targets. Newark’s GHG reduction targets were developed relative to the 2022 emissions inventory. Based on the sectors relevant to the City’s inventory, Newark’s GHG reduction targets are as follows:
2030 target: 40 percent below 2022 levels (225,092 MTCO2e), 2035 target: 58 percent below 2022 levels (160,291 MTCO2e), 2040 target: 72 percent below 2022 levels (104,538 MTCO2e), and 2045 target: 88 percent below 2022 levels (46,477 MTCO2e).

Figure 2 depicts the legislative-adjusted BAU forecasts by sector, as distinguished by colored wedges, and the City’s emissions reduction targets relative to the 2022 emissions inventory. The space between the trajectory of the black line (i.e., targets) and the top of the colored wedges (i.e., forecasted emissions) represents the “gap” in emissions that will need to be addressed through local actions for the City to meet its GHG reduction targets.

Figure 2
Packet Page No. 1607
The next steps to develop CAN includes hosting a community meeting on September 25th and preparing strategies and actions that can close the gap between the City’s legislative-adjusted forecast and reduction targets.

FISCAL IMPACT
The Climate Action Plan update is funded with an allocation of $197,000 from the Development Maintenance Impact Fee funds.

REVIEW AND APPROVAL
Prepared by - James Scanlin, Environmental Services Manager Reviewed by - Howard Young, Public Works Director
Reviewed by - Krysten Lee, Finance Director
Reviewed by - Kristopher J. Kokotaylo, City Attorney
Approved by - David J. Benoun, City Manager
Attachments
CAP presentation
Packet Page No. 1608
Climate
Action Plan
Update
Presented to Newark City Council
September 12, 2024
Packet Page No. 1609
We CAN | Climate Action Newark
Project Overview
Objectives, Principles, Schedule
2 Packet Page No. 1610
We CAN | Climate Action Newark
Project Overview and Objectives
• Comprehensively
update Newark’s
2010 CAP
• Align with State
GHG reduction
targets
• Address climate
mitigation and
adaptation
• Build upon
ongoing City
initiatives
• Provide CEQA
streamlining
benefits
• Engage the
community
• Provide
implementation
direction to staff
3 Packet Page No. 1611
We CAN | Climate Action Newark
Guiding Principles & Co-Benefits
4 Co-Benefits
• Economic
development
• Equity
• Adaptation/
resilience
• Resource
conservation
Guiding Principles
• Beneficial
• Specific
• Evidence-based
• Transparent
• Improved public
health
• Community cost
savings
• Environmental
quality
• Ambitious
• Realistic
• Collaborative
• Comprehensive
• Fair
Packet Page No. 1612
We CAN | Climate Action Newark
Project Schedule
5 Packet Page No. 1613
We CAN | Climate Action Newark
Climate Mitigation
Reducing greenhouse gas emissions
6 Packet Page No. 1614
We CAN | Climate Action Newark
Addressing Climate Change Locally
7 Packet Page No. 1615
We CAN | Climate Action Newark
Climate Mitigation Process
• 2022 communitywide inventory
• Emissions forecasts through 2045
• Newark-specific reduction targets in alignment with Stateadopted targets • New strategies and actions to reduce emissions and achieve targets
8 Packet Page No. 1616
We CAN | Climate Action Newark
Newark’s 2005 and 2022 Inventories
Emissions Sector 2005 Emissions
(MTCO2e)
2022 Emissions
(MTCO2e)
Percent Change
(2005-2022)
Residential Buildings 47,313 45,530 -4%
Commercial
Buildings
175,096 101,646 -42%
Transportation 192,841 206,749 +7%
Waste 18,607 10,974 -41%
Total 433,857 364,899* -16%
9 *2022 Emissions Total presented here is not the 2022 emissions total used for the CAP update. This table compares 2022 sectors that were also included in the 2005 inventory. The 2022 inventory more comprehensively accounts for emissions in the city.

Packet Page No. 1617
We CAN | Climate Action Newark
Newark’s 2022 Comprehensive Inventory and Forecasts
Emissions Sector 2022 Emissions
(MTCO2e)
2030 Emissions
(MTCO2e)
2045 Emissions
(MTCO2e)
On-Road Transportation 206,749 169,383 49,144
Building Energy 147,607 112,281 59,194
Off-Road Vehicles/Equipment 10,974 9,720 10,403
Waste 10,255 12,921 15,321
Water 1,188 860 0
Wastewater Treatment 552 611 694
Total 377,325 308,801 135,078
Percent Change from 2022 NA -18% -64%
10 Includes:
• population, employment, housing growth
• known legislative effects
Legislative-Adjusted Forecast:

Emissions without additional action taken in
Newark by residents, businesses, or City
Packet Page No. 1618
GHG Emissions (MTCO2e)
* 400,000
* 350,000
* 300,000
* 250,000
* 200,000
* 150,000
* 100,000
* 50,000
* -
2022 2030 2035 2040 2045
Building Energy Off-Road On-Road Solid Waste Wastewater Water 0 We CAN | Climate Action Newark
Effect of Federal & State Legislation on Newark’s
Emissions
11 Forecast without
adopted federal
and state legislation
Packet Page No. 1619
GHG Reduction
Targets
Newark’s fair share of statewide
targets, based on 2022 GHG
inventory
• 2030: 40% below 2022 levels
• 2035: 58% below 2022 levels
• 2040: 72% below 2022 levels
• 2045: 88% below 2022 levels
12 Packet Page No. 1620
GHG Emissions (MTCO2e)
* 400,000
* 350,000
* 300,000
* 250,000
* 200,000
* 150,000
* 100,000
* 50,000
* -
2022 2030 2035 2040 2045
Building Energy Off-Road On-Road Solid Waste Wastewater Water We CAN | Climate Action Newark
Closing the Emissions “Gap”
13 Local actions need to reduce 2030
emissions by 42%, after effects of
federal and state legislation
Packet Page No. 1621
We CAN | Climate Action Newark
Project Schedule
14 We are here
Packet Page No. 1622
We CAN | Climate Action Newark
Next Steps
• Staff continue to develop and
refine climate action strategies
• Staff are aligning CAP update
with sea level rise project
• Upcoming engagement with
residents and businesses
• Draft strategies and actions to
be presented to City Council
15 Packet Page No. 1623
We CAN | Climate Action Newark
Thank You
16 Packet Page No. 1624
Item  F. 5.

DATE 09/12/2024
TO Honorable Mayor and City Council Members
FROM Lenka Hovorka, Assistant City Manager
SUBJECT    Introduction of an Ordinance amending Chapter 2.09 of the Newark Municipal Code ("City Councilmembers-Compensation") to
increase the salaries of City Councilmembers and Mayor.

SUMMARY AND RECOMMENDATION
On June 27, 2024, City Council approved the 2024-2026 Biennial Budget and Capital Improvement Plan which included a six percent increase for the Mayor and Councilmembers. Staff recommends that the City Council waive full reading and, by title only, introduce an ordinance amending Chapter 2.09 of the Newark Municipal Code ("City Councilmembers-Compensation") to increase the salaries of City Councilmembers and Mayor by six percent (6%).

BACKGROUND
The salaries and benefits for the Mayor and City Councilmembers are set by City ordinance. The current monthly salaries are $2,999 for the Mayor and $1,371 for each Councilmember. City Council salaries were last increased on January 1, 2023, by ten percent (10%).

Chapter 2.09 of the Newark Municipal Code requires that the City Council, as part of the two-year biennial budget cycle, review its compensation and consider increases in the Consumer Price Index for the region and increases in compensation awarded to staff since the previous adjustment to City Council compensation.

DISCUSSION/ANALYSIS
During the presentation of the draft 2024-2026 Biennial Budget to the City Council on May 23, 2024, staff reported the combined annual increases for 2023 and 2024 in the Consumer Price Index totaled seven and seven-tenths percent (7.7%). Staff compensation increased six percent (6%) over the same two-year period. The cost of a 6% salary increase to the total compensation for the Mayor and City Councilmembers is $12,073.64 for the period of January 1, 2025 to June 30, 2026. After presentation of this information, City Council directed staff to include a six percent (6%) salary increase for the Mayor and Councilmembers in the final 2024-2026 Biennial Budget and Capital Improvement Plan.

Packet Page No. 1625
To effect the salary increases, Chapter 2.09 of the Newark Municipal Code must be amended. A draft ordinance has been prepared that would, starting January 1, 2025, increase the monthly salary of Councilmembers from $1,371 to $1,453. The Mayor's monthly salary would increase from $2,999 to $3,179. There are no other proposed revisions.

FISCAL IMPACT
There is no fiscal impact associated with this action, as the six percent salary increase was included in the 2024-2026 Biennial Budget approved by City Council on June 27, 2024.

REVIEW AND APPROVAL
Prepared by - Lenka Hovorka, Assistant City Manager
Reviewed by - Krysten Lee, Finance Director
Reviewed by - Kristopher J. Kokotaylo, City Attorney
Approved by - David J. Benoun, City Manager
Attachments
Council Compensation Ordinance
Packet Page No. 1626
ORDINANCE NO.

AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF
NEWARK AMENDING CHAPTER 2.09, CITY

COUNCILMEMBERS - COMPENSATION, OF THE NEWARK

MUNICIPAL CODE TO INCREASE THE SALARIES OF CITY
COUNCILMEMBERS AND MAYOR BY SIX PERCENT (6%)
WHEREAS, Chapter 2.09 ("City Councilmembers - Compensation") of the Newark Municipal Code provides for the payment of salaries and benefits to Newark City Councilmembers and the Mayor; and
WHEREAS, Section 2.09.010 authorizes the City to pay Councilmembers a salary of one thousand three hundred seventy-one dollars ($1,371) per month; and WHEREAS, said section authorizes the City to pay the Mayor a salary of two thousand nine hundred ninety-nine dollars ($2,999) per month; and WHEREAS, said salaries took effect January 1, 2023; and WHEREAS, City Councilmembers and Mayor have not received an increase in salary since January 1, 2023; and
WHEREAS, the City Council is authorized by Government Code Section 36516 to increase the salary of Councilmembers in an amount not to exceed five percent (5%) per calendar year from the operative date of the last adjustment of salary; and WHEREAS, the City Council is authorized by Government Code Section 36516.1 to pay an elected Mayor salary in excess to that which they receive as a Councilmember; and WHEREAS, at the City Council meeting held on May 23, 2024, City staff presented to the Council regarding the Mayoral and City Council Member salary and benefits; and WHEREAS, at the City Council meeting held on June 27, 2024, City Council adopted the 2024-2026 Biennial Budget and Capital Improvement Plan which included six percent (6%) salary increases for the Mayor and City Council Members; and
WHEREAS, the City Council desires to increase salaries of the Council Members and Mayor by six percent (6%) starting January 1, 2025.

NOW, THEREFORE, the City Council of the City of Newark does hereby ordain as follows:

SECTION 1. Recitals. The above recitals are true and correct and made a part of this Ordinance.

SECTION 2. Amendment of Section 2.09.010 the Newark Municipal Code. Subsections (A) Packet Page No. 1627
and (B) of Section 2.09.010 (“Salary”) of Chapter 2.09 (“City Council”) of Title 2 ("Administration and Personnel") are hereby amended as follows (replacements in double underline; deletions in strikethrough):

2.09.010 Salary.

A. Pursuant to Government Code Sections 36516 and 36516.5, each councilmember, other than the mayor, shall receive a salary of one thousand three hundred seventy-one dollars one thousand four hundred fifty-three dollars per month commencing January 1, 2023 January 1, 2025.

B. Pursuant to Government Code Section 36516.1, the elective mayor shall receive compensation in the amount of two thousand nine hundred ninety-nine dollars three thousand one hundred seventy-nine dollars per month commencing January 1, 2023 January 1, 2025.

SECTION 3. Severability. If any provision of this Ordinance or the application thereof to any person or circumstance is held invalid, the remainder of the Ordinance, including the application of such part or provision to other persons or circumstances shall not be affected thereby and shall continue in full force and effect. To this end, provisions of this Ordinance are severable. The City Council hereby declares that it would have passed each section, subsection, subdivision, paragraph, sentence, clause, or phrase hereof irrespective of the fact that any one or more sections, subsections, subdivisions, paragraphs, sentences, clauses, or phrases be held unconstitutional, invalid, or unenforceable.

SECTION 4. CEQA. Approval of the ordinance is exempt from further environmental review under the general rule in California Environmental Quality Act (CEQA) Guidelines Section 15061(b)(3) that CEQA only applies to projects that have the potential for causing a significant effect on the environment. As a series of text amendments and additions that do not authorize any new activity, it can be seen with certainty that there is no possibility that the ordinance will have a significant effect on the environment.

SECTION 5. Publication and Effective Date. In accordance with Government Code section 36516.5, this ordinance shall take effect January 1, 2025. Before expiration of fifteen (15) days after its passage, this ordinance shall be published in the Tri-City Voice, a newspaper of general circulation published and printed in the County of Alameda and circulated in the City of Newark.

Packet Page No. 1628
Item  I. 1.

DATE 09/12/2024
TO Honorable Mayor and City Council Members
FROM Steven Turner, Community Development Director
SUBJECT    Conference with Real Property Negotiators (Pursuant to Government Code Section 54956.8)
Property: Stevenson Boulevard, Newark, CA 94560. APNs:
537-850-7-1, 537-850-8, 537-850-10, 537-850-11-3
City Negotiators: David Benoun, Steven Turner and Craig Bettencourt
Negotiating Parties: Seamus O’Connor and David Bider
Under Negotiation: Review of Price and Terms
Packet Page No. 1629

← All documents from this meeting