SECTION 2: Subsequent or Supplemental Environmental Review Not Required. Based on the information presented to the City Council, and the specific findings set forth in Section 1, above, the City Council finds that the preparation of a subsequent or supplemental Certified EIR is not required for the Project, as the Project:
(1) Does not constitute substantial changes to the Certified EIR that will require major revisions to the Certified EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; and
(2) Does not constitute substantial changes with respect to the circumstances under which the Certified EIR was prepared, that will require major revisions to the Certified EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of the previously identified significant effects; and
(3) Does not contain new information of substantial importance that was not known and could not have been known with the exercise of reasonable diligence at the time the Certified EIR was certified/adopted, that shows any of the following:
(a) The project will have one or more significant effects not discussed in the Certified EIR; or
(b) Significant effects previously examined will be substantially more severe than shown in the Certified EIR; or
(c) Mitigation measures or alternatives previously found not to be feasible would in fact be feasible and would substantially reduce one or more significant effects of the Project, but the City declined to adopt such measures; or (d) Mitigation measures or alternatives considerably different from those analyzed in the Certified EIR would substantially reduce one or more significant effects on the environment, but which the City declined to adopt. 625
SECTION 3: Housing Element Compliance. Pursuant to the requirements of California Government Code Chapter 3, Article 10.6, commencing with Section 65580, as the recommending authority for the Project, the City Council finds that based on the facts and information contained in the Application and supporting documentation, at the time of Project implementation, the project is consistent with the Housing Element of the Policy Plan (General Plan) component of The Ontario Plan. The project site is not one of the properties in the Housing Element Sites contained in Tables B-1 and B-2 (Housing Element Sites Inventory) of the Housing Element Technical Report.
SECTION 4: Airport Land Use Compatibility Plan ("ALUCP") Compliance.
The California State Aeronautics Act (Public Utilities Code Section 21670 et seq.) requires that an Airport Land Use Compatibility Plan be prepared for all public use airports in the State; and requires that local land use plans and individual development proposals must be consistent with the policies set forth in the adopted Airport Land Use Compatibility Plan.
(1) On April 19, 2011, the City Council of the City of Ontario approved and adopted the Ontario International Airport Land use Compatibility Plan, establishing the Airport Influence Area for Ontario International Airport, which encompasses lands within parts of San Bernardino, Riverside, and Los Angeles Counties, and limits future land uses and development within the Airport Influence Area, as they relate to noise, safety, airspace protection, and overflight impacts of current and future airport activity. As the recommending authority for the Project, the City Council has reviewed and considered the facts and information contained in the Application and supporting documentation against the ONT ALUCP compatibility factors, including [1] Safety Criteria (ONT ALUCP Table 2-2) and Safety Zones (ONT ALUCP Map 2-2), [2] Noise Criteria (ONT ALUCP Table 2-3) and Noise Impact Zones (ONT ALUCP Map 2-3), [3] Airspace protection Zones (ONT ALUCP Map 2-4), and [4] Overflight Notification Zones (ONT ALUCP Map 2-5). As a result, the City Council, therefore, finds and determines that the Project, is will be consistent with the policies and criteria set forth within the ONT ALUCP; and (2) On August 2, 2022, the City Council of the City of Ontario approved and adopted a Development Code Amendment to establish the Chino Airport ("CNO") Overlay Zoning District ("OZD") and Reference I, Chino Airport Land Use Compatibility Plan ("CNO ALUCP"). The CNO OZD and CNO ALUCP established the Airport Influence Area for Chino Airport, solely within the City of Ontario, and limits future land uses and development within the Airport Influence Area, as they relate to safety, airspace protection, and overflight impacts of current and future airport activity. The CNO ALUCP is consistent with policies and criteria set forth within the Caltrans 2011 California Airport Land Use Planning Handbook. The proposed Project is located within the Airport Influence Area of Chino Airport and was evaluated and found to be consistent with the California Airport Land Use Planning Handbook and the CNO ALUCP. As the recommending authority for the Project, the City Council has reviewed and considered the facts and information contained in the Application and supporting documentation against the CNO ALUCP compatibility factors, including Safety, Airspace Protection, Overflight. As a result, the City Council therefore, finds and determines that the Project is consistent with the policies and criteria set forth within the California Airport Land Use Planning Handbook and the Chino ALUCP.
626
SECTION 5: Concluding Facts and Reasons. Based upon the substantial evidence presented to the City Council during the above-referenced hearing, and upon the specific findings set forth in Section 1 through 4, above, the City Council hereby concludes as follows:
(1) The Development Agreement applies to approximately 10.02 acres of land located south of Chatham Street, west of Clifton Avenue, east of Amherst Avenue, and north of Eucalyptus Avenue, within Planning Area 11 of the Esperanza Specific Plan; and
(2) The Development Agreement establishes parameters for the development of land within the Esperanza Specific Plan. The Development Agreement also grants the Applicant, the right to develop, the ability to quantify the fees; and establish the terms and conditions that apply to those projects. These terms and conditions are consistent with The Ontario Plan Policy Plan (General Plan), design guidelines and development standards for the Esperanza Specific Plan; and (3) The Development Agreement grants the Applicant a vested right to develop Tentative Tract Map 20730 (File No. PMTT24-008) as long as the Applicant complies with the terms and conditions of the Esperanza Specific Plan and EIR. Tentative Tract Map 20730 located south of Chatham Street, west of Clifton Avenue, east of Amherst Avenue, and north of Eucalyptus Avenue and proposes to subdivide 10.02 acres into 28 numbered lots for a total of 161 condominium units and 15 lettered lots, for residential uses, private drives, landscape edges, and common open space purposes; and
(4) The Development Agreement has been prepared in conformance with the goals and policies of The Ontario Plan Policy Plan (General Plan); and (5) The Development Agreement does not conflict with the Land Use Policies of The Ontario Plan Policy Plan (General Plan) and will provide for development, within the district, in a manner consistent with the Policy Plan and with related development; and
(6) This Development Agreement will promote the goals and objectives of the Land Use Element of the Policy Plan; and
(7) This Development Agreement will not be materially injurious or detrimental to the adjacent properties and will not have a significant impact on the environment or the surrounding properties for which a Subsequent Environmental Impact Report (SCH# 2004011009) was adopted by the City Council on November 21, 2023; and
(8) This Application introduces no new significant environmental impacts. All previously adopted mitigation measures are a condition of project approval and are incorporated herein by this reference.
627
SECTION 6: City Council Action. Based upon the findings and conclusions set forth in Sections 1 through 5, above, the City Council hereby APPROVES the Development Agreement (File No. PDA24-004), attached hereto as "Attachment A," and incorporated herein by this reference.
SECTION 7: City Manager Administrative Authority. The City Council acknowledges that refinements and further development of the Ontario Ranch development area may demonstrate that changes are appropriate with respect to the details and performance of the parties under the Development Agreement. The City Council desires to retain a certain degree of flexibility with respect to the details of the Ontario Ranch developments, and with respect to those items covered in general terms under the Development Agreement. If and when the City Manager (or designee) and the Developer mutually find that changes, adjustments, or clarifications are appropriate to further the intended purposes of the Development Agreement, and such are not materially inconsistent with the Development Agreement, they may, unless otherwise required by law, effectuate such changes, adjustments, or clarifications by written amendment to this Agreement, or through one or more memoranda which are mutually approved by the City Manager on behalf of the City and by the Developer, and, after execution, shall be attached to the Development Agreement and become a part thereof. Unless otherwise required by law, no such changes, adjustments, or clarifications shall require prior notice or hearing before the City Council. The City Manager, with the approval of the City Attorney, shall have the authority but not the obligation to execute amendments, memoranda or other documents, and may take any action necessary to implement the Development Agreement.
SECTION 8 : Indemnification. The Applicant shall agree to defend, indemnify and hold harmless, the City of Ontario or its agents, officers, and employees from any claim, action or proceeding against the City of Ontario or its agents, officers or employees to attack, set aside, void, or annul this approval. The City of Ontario shall promptly notify the applicant of any such claim, action, or proceeding, and the City of Ontario shall cooperate fully in the defense.
SECTION 9: Custodian of Records. The documents and materials that constitute the record of proceedings on which these findings have been based are located at the City of Ontario City Hall, 303 East "B" Street, Ontario, California 91764. The custodian for these records is the City Clerk of the City of Ontario.
SECTION 10: Severability. If any section, sentence, clause or phrase of this Ordinance or the application thereof to any entity, person or circumstance is held for any reason to be invalid or unconstitutional, such invalidity or unconstitutionality shall not affect other provisions or applications of this Ordinance which can be given effect without the invalid provision or application, and to this end the provisions of this Ordinance are severable. The People of the City of Ontario hereby declare that they would have adopted this Ordinance and each section, sentence, clause or phrase thereof, irrespective of the fact that any one or more section, subsections, sentences, clauses or phrases be declared invalid or unconstitutional.
SECTION 11: Effective Date. This Ordinance shall become effective 30 days following its adoption.
628
SECTION 12: Publication and Posting. The Mayor shall sign this Ordinance and the City Clerk shall certify as to the adoption and shall cause a summary thereof to be published at least once, in a newspaper of general circulation in the City of Ontario, California within 15 days following the adoption. The City Clerk shall post a certified copy of this ordinance, including the vote for and against the same, in the Office of the City Clerk, in accordance with Government Code Section 36933.
PASSED, APPROVED, AND ADOPTED this ________ day of _________ 2025. _____________________________________
PAUL S. LEON, MAYOR
ATTEST:
_________________________________
SHEILA MAUTZ, CITY CLERK
APPROVED AS TO FORM:
_______________________________
BEST BEST & KRIEGER LLP
CITY ATTORNEY
629
STATE OF CALIFORNIA )
COUNTY OF SAN BERNARDINO )
CITY OF ONTARIO )
I, SHEILA MAUTZ, City Clerk of the City of Ontario, DO HEREBY CERTIFY that foregoing Ordinance No. _______ was duly introduced at a regular meeting of the City Council of the City of Ontario held _____________ and adopted at the regular meeting held ___________, 2025 by the following roll call vote, to wit:
AYES: COUNCIL MEMBERS:
NOES: COUNCIL MEMBERS:
ABSENT: COUNCIL MEMBERS:
_________________________________
SHEILA MAUTZ, CITY CLERK
(SEAL)
I hereby certify that the foregoing is the original of Ordinance No. _______ duly passed and adopted by the Ontario City Council at their regular meeting held ____________ and that Summaries of the Ordinance were published on ___________ and _____________, in the Inland Valley Daily Bulletin newspaper.
__________________________________
SHEILA MAUTZ, CITY CLERK
(SEAL)
630
ATTACHMENT A:
FILE NO. PDA25-003
DEVELOPMENT AGREEMENT
By and Between
City of Ontario
a California municipal corporation
and
GDC Investments 13, LP
(Development Agreement to follow this page)
631
45774.0021C\7810652.1
RECORDING REQUESTED BY AND
WHEN RECORDED MAIL TO:
CITY OF ONTARIO
CITY CLERK / RECORDS MANAGEMENT
303 EAST “B” STREET
ONTARIO, CA 91764-4196
Exempt from Fees Per Gov. Code § 6103
______________________________________________________________________ Space above this line for Recorder’s Use Only
FILE NO. PDA25-003
DEVELOPMENT AGREEMENT
By and Between
City of Ontario
a California municipal corporation
and
GDC Investments 13, L.P.
_________________________, 2025
San Bernardino County, California
632
-2-
DEVELOPMENT AGREEMENT PDA25-003
This Development Agreement (hereinafter “Agreement”) is entered into effective as of the ____ day of ____________, 2025 by and among the City of Ontario, a California municipal corporation (hereinafter “CITY”), and GDC Investments 13, L.P., a Delaware limited partnership (hereinafter “OWNER”):
RECITALS
WHEREAS, CITY is authorized to enter into binding development agreements with persons having legal or equitable interests in real property for the development of such property, pursuant to Section 65864, et seq. of the Government Code; and WHEREAS, OWNER has requested CITY to enter into a development agreement and proceedings have been taken in accordance with the rules and regulations of CITY; and
WHEREAS, by electing to enter into this Agreement, CITY shall bind future City Councils of CITY by the obligations specified herein and limit the future exercise of certain governmental and proprietary powers of CITY; and WHEREAS, the terms and conditions of this Agreement have undergone extensive review by CITY and the City Council and have been found to be fair, just and reasonable; and
WHEREAS, the best interests of the citizens of the CITY and the public health, safety and welfare will be served by entering into this Agreement; and WHEREAS, all of the procedures of the California Environmental Quality Act have been met with respect to the Project and the Agreement in that Esperanza Specific Plan (State Clearinghouse No. 2021070364 (the “FEIR”). The City Council found and determined that the FEIR was prepared in accordance with the requirements of the California Environmental Quality Act and adequately describes the impacts of the project described in the FEIR, which included consideration of this Agreement; and WHEREAS, this Agreement and the Project are consistent with the CITY’s Comprehensive General Plan and the Esperanza Specific Plan; and WHEREAS, all actions taken and approvals given by CITY have been duly taken or approved in accordance with all applicable legal requirements for notice, public hearings, findings, votes, and other procedural matters; and WHEREAS, development of the Property in accordance with this Agreement will provide substantial benefits to CITY and will further important policies and goals of CITY; and
WHEREAS, this Agreement will eliminate uncertainty in planning and provide for the orderly development of the Property, ensure progressive installation of necessary 633
-3-
improvements, provide for public services appropriate to the development of the Project, and generally serve the purposes for which development agreements under Sections 65864 et seq. of the Government Code are intended; and
WHEREAS, OWNER has incurred and will in the future incur substantial costs in excess of the generally applicable requirements in order to assure vesting of legal rights to develop the Property in accordance with this Agreement.
WHEREAS, the Property is located in an area of the City of Ontario that has been known as the “New Model Colony” area and the New Model Colony area has now been renamed as “Ontario Ranch.”
WHEREAS, the property developer/owners are made aware of the South Archibald Trichloroethylene (TCE) Plume Disclosure Letter (Exhibit “G”). Property owner may wish to provide the attached Letter as part of the Real Estate Transfer Disclosure requirements under California Civil Code Section 1102 et seq. This may include notifications in the Covenants, Conditions and Restrictions (CC&Rs) or other documents related to property transfer and disclosures. Additional information on the plume is available from the Santa Ana Regional Water Quality Control Board at http://geotracker.waterboards.ca.gov/profile_report.asp?global_id=T10000004658
COVENANTS
NOW, THEREFORE, in consideration of the above recitals and of the mutual covenants hereinafter contained and for other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, the parties agree as follows:
1. DEFINITIONS AND EXHIBITS.
1.1 Definitions. The following terms when used in this Agreement shall be defined as follows:
1.1.1 “Agreement” means this Development Agreement.
1.1.2 “CITY” means the City of Ontario, California, a California municipal corporation.
1.1.3 “Construction Agreement” means that certain Agreement for the Financing and Construction of Phases I and II Infrastructure Improvements to Serve an Easterly Portion of the New Model Colony, entered into between the CITY and NMC Builders as of the 4th day of October, 2005, and all amendments thereto and “Construction Agreement Amendment” means that First Amended and Restated Agreement for the Financing and Construction of Limited Infrastructure Improvements to Serve and Easterly Portion of the New Model Colony entered into between the CITY and NMC Builders as of the 21st day of August 2012.
1.1.4 “Development” means the improvement of the Property for the purposes of completing the structures, improvements and facilities comprising the Project 634
-4-
including, but not limited to: grading; the construction of public infrastructure and public facilities related to the Project whether located within or outside the Property; the construction of buildings and structures; and the installation of landscaping. “Development” does not include the maintenance, repair, reconstruction or redevelopment of any building, structure, improvement or facility after the construction and completion thereof.
1.1.5 “Development Approvals” means all permits and other entitlements for use subject to approval or issuance by CITY in connection with development of the Property including, but not limited to:
(a) specific plans and specific plan amendments;
(b) tentative and final subdivision and parcel maps;
(c) development plan review;
(d) conditional use permits (including model home use permits), public use permits and plot plans;
(e) zoning;
(f) grading and building permits.
1.1.6 “Development Exaction” means any requirement of CITY in connection with or pursuant to any Land Use Regulation or Development Approval for the dedication of land, the construction of improvements or public facilities, or the payment of fees in order to lessen, offset, mitigate or compensate for the impacts of development on the environment or other public interests.
1.1.7 “Development Impact Fee” means a monetary exaction, other than a tax or special assessment, whether characterized as a fee or a tax and whether established for a broad class of projects by legislation of general applicability or imposed on a specific project on an ad hoc basis, that is charged by a local agency to the applicant in connection with approval of a development project for the purpose of defraying all or a portion of the cost of public facilities related to the development project, and, for purposes of this Agreement only, includes fees collected under development agreements adopted pursuant to Article 2.5 of the Government Code (commencing with Section 65864) of Chapter 4, For purposes of this Agreement only, "Development Impact Fee" shall not include processing fees and charges imposed by CITY to cover the estimated actual costs to CITY of processing applications for Development Approvals or for monitoring compliance with any Development Approvals granted or issued, including, without limitation, fees for zoning variances; zoning changes; use permits; building inspections; building permits; filing and processing applications and petitions filed with the local agency formation commission or conducting preliminary proceedings or proceedings under the Cortese-Knox-Hertzberg Local Government Reorganization Act of 2000, Division 3 (commencing with Section 56000) of Title 5 of the Government Code; the processing of maps under the provisions of the Subdivision 635
-5-
Map Act, Division 2 (commencing with Section 66410) of Title 7 of the Government Code; or planning services under the authority of Chapter 3 (commencing with Section 65100) of Division 1 of Title 7 of the Government Code, fees and charges as described in Sections 51287, 56383, 57004, 65104, 65456, 65863.7, 65909.5, 66013, 66014, and 66451.2 of the Government Code, Sections 17951, 19132.3, and 19852 of the Health and Safety Code, Section 41901 of the Public Resources Code, and Section 21671.5 of the Public Utilities Code, as such codes may be amended or superceded, including by amendment or replacement.
1.1.8 “Development Plan” means the Existing Development Approvals and the Existing Land Use Regulations applicable to development of the Property.
1.1.9 “Effective Date” means the date that the ordinance approving this Agreement goes into effect.
1.1.10 “Existing Development Approvals” means all Development Approvals approved or issued prior to the Effective Date. Existing Development Approvals includes the Approvals incorporated herein as Exhibit “C” and all other Approvals which are a matter of public record on the Effective Date.
1.1.11 “Existing Land Use Regulations” means all Land Use Regulations in effect on the Effective Date. Existing Land Use Regulations includes the Regulations incorporated herein as Exhibit “D” and all other Land Use Regulations that are in effect and a matter of public record on the Effective Date.
1.1.12 “General Plan” means the General Plan adopted on August 16, 2022.
1.1.13 “Improvement” or “Improvements” means those public improvements required to support the development of the Project as described in the Tract Map conditions for Tract No. 20730 as further described in Exhibit “F” (the “Infrastructure Improvements Exhibit”).
1.1.14 “Land Use Regulations” means all ordinances, resolutions, codes, rules, regulations and official policies of CITY governing the development and use of land, including, without limitation, the permitted use of land, the density or intensity of use, subdivision requirements, timing and phasing of development, the maximum height and size of buildings, the provisions for reservation or dedication of land for public purposes, and the design, improvement and construction standards and specifications applicable to the development of the Property. “Land Use Regulations” does not include any CITY ordinance, resolution, code, rule, regulation or official policy, governing:
(a) the conduct of businesses, professions, and occupations; (b) taxes and assessments;
(c) the control and abatement of nuisances;
636
-6-
(d) the granting of encroachment permits and the conveyance of similar rights and interests that provide for the use of or the entry upon public property; (e) the exercise of the power of eminent domain.
1.1.15 “Mortgagee” means a mortgagee of a mortgage, a beneficiary under a deed of trust or any other security-device lender, and their successors and assigns.
1.1.16 “Net MDD” means net maximum daily water demand.
1.1.17 “NMC Builders” means the consortium of investors and developers responsible for the construction of infrastructure within the New Model Colony incorporated as NMC Builders, LLC.
1.1.18 “Model Units” means a maximum of 2 buildings comprising a total of 12 model units, private common recreation facilities and sales facilities constructed by OWNER prior to the construction of any Production units and not offered for sale and occupancy for a period of time after the issuance of permits for Production Units.
1.1.19 “OWNER” means the persons and entities listed as owner on page 1 of this Agreement and their permitted successors in interest to all or any part of the Property.
1.1.20 “Production Unit(s)” means all units constructed for sale and occupancy by OWNER and excludes the specified number of Model Units constructed by OWNER for promotion of sales.
1.1.21 “Project” means the development of the Property contemplated by the Development Plan, as such Plan may be further defined, enhanced or modified pursuant to the provisions of this Agreement.
1.1.22 “Property” means the real property described on Exhibit “A” and shown on Exhibit “B” to this Agreement.
1.1.23 “Reservations of Authority” means the rights and authority excepted from the assurances and rights provided to OWNER under this Agreement and reserved to CITY under Section 3.6 of this Agreement.
1.1.24 “Specific Plan” means that certain specific plan adopted by the City Council, and entitled, “Esperanza Specific Plan.”
1.1.25 "Storm Water Treatment Capacity Availability” means a designated portion of the total Storm Water Treatment Capacity Availability made available through the completion of construction of a Phase of regional storm water treatment facilities by the NMC Builders LLC as described in the Construction Agreement Amendment. The amount, in acres, of Storm Water Treatment Capacity Availability required for the issuance of a grading permit shall be based upon the factors and assumptions listed in the Construction Agreement Amendment.
637
-7-
1.1.26 “Subsequent Development Approvals” means all Development Approvals required subsequent to the Effective Date in connection with development of the Property.
1.1.27 “Subsequent Land Use Regulations” means any Land Use Regulations adopted and effective after the Effective Date of this Agreement.
1.1.28 “Water Availability Equivalent (WAE)” means a designated portion of the total Net MDD made available through the construction of each Phase described in the Water Phasing Plan of the Construction Agreement. The number of Water Availability Equivalents (of portions thereof) required for the issuance of each building permit shall be based upon water demand factors and assumptions listed in the Construction Agreement and Construction Agreement Amendment as “Water Availability Equivalents by Land Use” for each land use category.
1.2 Exhibits. The following documents are attached to, and by this reference made a part of, this Agreement:
Exhibit “A” — Legal Description of the Property.
Exhibit “B” — Map showing Property and its location.
Exhibit “C” — Existing Development Approvals.
Exhibit “D” — Existing Land Use Regulations.
Exhibit “E” — Description of Required Infrastructure Improvements Exhibit “F” — Depiction of Required Infrastructure Improvements Exhibit Exhibit “G” - Form of Plume Disclosure Letter
2. GENERAL PROVISIONS.
2.1 Binding Effect of Agreement. The Property is hereby made subject to this Agreement. Development of the Property is hereby authorized and shall be carried out only in accordance with the terms of this Agreement.
2.2 Ownership of Property. OWNER represents and covenants that it is the owner of the fee simple title to the Property or a portion thereof, or has the right to acquire fee simple title to the Property or a portion thereof from the current owner(s) thereof. To the extent OWNER does not own fee simple title to the Property, OWNER shall obtain written consent from the current fee owner of the Property agreeing to the terms of this Agreement and the recordation thereof.
2.3 Term. The term of this Agreement shall commence on the Effective Date and shall continue for an initial term of ten (10) years thereafter unless this term is modified or extended pursuant to the provisions of this Agreement. The term of this 638
-8-
Agreement may be extended for an additional five (5) years following expiration of the initial ten (10) year term, provided the following have occurred:
(a) OWNER provides at least 180 days written notice to CITY prior to expiration of the initial term; and
(b) In non-mixed use and residential use only projects, the OWNER shall have obtained, as applicable, building permits for at least seventy percent (70%) of the actual number of residential units permitted under this Agreement; and (c) OWNER is not then in uncured default of this Agreement.
2.4 Assignment.
2.4.1 Right to Assign. OWNER shall have the right to sell, transfer or assign the Property in whole or in part (provided that no such partial transfer shall violate the Subdivision Map Act, Government Code Section 66410, et seq.), to any person, partnership, limited liability company, joint venture, firm or corporation at any time during the term of this Agreement; provided, however, that any such sale, transfer or assignment shall include the assignment and assumption of the rights, duties and obligations arising under or from this Agreement and be made in strict compliance with the following:
(a) No sale, transfer or assignment of any right or interest under this Agreement shall be made unless made together with the sale, transfer or assignment of all or a part of the Property. OWNER may be required to provide disclosure that the Property is within the South Archibald Trichloroethylene (TCE) Plume. OWNER may wish to provide the attached Disclosure Letter (Exhibit G) as part of the Real Estate Transfer Disclosure requirements under California Civil Code Section 1102 et seq. (b) Concurrent with any such sale, transfer or assignment, or within fifteen (15) business days thereafter, OWNER shall notify CITY’s City Manager, in writing, of such sale, transfer or assignment and shall provide CITY with: (1) an executed agreement, in a form reasonably acceptable to CITY, by the purchaser, transferee or assignee and providing therein that the purchaser, transferee or assignee expressly and unconditionally assumes all the duties and obligations of OWNER under this Agreement with respect to the portion of the Property so sold, transferred or assigned; and (2) the payment of the applicable processing charge to cover the CITY’s review and consideration of such sale, transfer or assignment. (c) Any sale, transfer or assignment not made in strict compliance with the foregoing conditions shall constitute a default by OWNER under this Agreement.
Notwithstanding the failure of any purchaser, transferee or assignee to execute the agreement required by Paragraph (b) of this Subsection 2.4.1, the burdens of this Agreement shall be binding upon such purchaser, transferee or assignee, but the benefits of this Agreement shall not inure to such purchaser, transferee or assignee until and unless such agreement is executed. The City Manager shall have the authority to 639
-9-
review, consider and either approve, conditionally approve, or deny any proposed sale, transfer or assignment that is not made in compliance with this section 2.4.
2.4.2 Release of Transferring Owner. Notwithstanding any sale, transfer or assignment, a transferring OWNER shall continue to be obligated under this Agreement unless such transferring owner is given a release in writing by CITY, which release shall be provided by CITY upon the full satisfaction by such transferring owner of the following conditions:
(a) OWNER no longer has a legal or equitable interest in all or any part of the portion of the Property sold, transferred or assigned.
(b) OWNER is not then in default under this Agreement.
(c) OWNER has provided CITY with the notice and executed agreement required under Paragraph (b) of Subsection 2.4.1 above. (d) The purchaser, transferee or assignee provides CITY with security equivalent to any security previously provided by OWNER to secure performance of its obligations hereunder.
2.4.3 Effect of Assignment and Release of Obligations. In the event of a sale, transfer or assignment pursuant to the provisions of Section 2.4.2 above:
(a) The assignee shall be liable for the performance of all obligations of OWNER with respect to transferred property, but shall have no obligations with respect to the portions of the Property, if any, not transferred (the “Retained Property”). (b) The owner of the Retained Property shall be liable for the performance of all obligations of OWNER with respect to Retained Property, but shall have no further obligations with respect to the transferred property.
(c) The assignee’s exercise, use and enjoyment of the Property or portion thereof shall be subject to the terms of this Agreement to the same extent as if the assignee were the OWNER.
2.4.4 Subsequent Assignment. Any subsequent sale, transfer or assignment after an initial sale, transfer or assignment shall be made only in accordance with and subject to the terms and conditions of this Section 2.4.
2.4.5 Termination of Agreement with Respect to Individual Lots Upon Sale to Public and Completion of Construction. The provisions of Subsection 2.4.1 shall not apply to the sale or lease (for a period longer than one year) of any lot which has been finally subdivided and is individually (and not in “bulk”) sold or leased to a member of the public or other ultimate user. Notwithstanding any other provisions of this Agreement, this Agreement shall terminate with respect to any lot and such lot shall be released and no longer be subject to this Agreement without the execution or recordation of any further document upon satisfaction of both of the following conditions:
640
-10-
(a) The lot has been finally subdivided and individually (and not in “bulk”) sold or leased (for a period longer than one year) to a member of the public or other ultimate user; and,
(b) A certificate of occupancy has been issued for a building on the lot, and the fees set forth under Section 4 of this Agreement have been paid.
2.4.6 Partial Assignment and Assumption. CITY and OWNER agree OWNER may partially assign its obligations and rights under this Agreement, and all amendments hereto, to a purchaser, transferee or assignee of a lot, which has been subdivided subject to provisions of a partial assignment and assumption agreement in a form approved by CITY. Any such complete and executed partial assignment and assumption of this Agreement shall be submitted to CITY for approval pursuant to Section 2.4.1 of this Agreement. CITY shall review, and if the above conditions, including but not limited to, those conditions in Section 2.4.2, are satisfied, CITY may approve the partial assignment and release and notify the purchaser, transferee or assignee in writing thereof. No such release approved pursuant to this Subsection 2.4.6 shall cause, or otherwise affect, a release of OWNER from the duties and obligations under this Agreement that are retained by OWNER and excluded from the transfer or assignment.
2.5 Amendment or Cancellation of Agreement. This Agreement may be amended or cancelled in whole or in part only in the manner provided for in Government Code Section 65868.1. Any amendment of this Agreement, which amendment has been requested by OWNER, shall be considered by the CITY only upon the payment of the applicable processing charge. This provision shall not limit any remedy of CITY or OWNER as provided by this Agreement. Either Party or successor in interest, may propose an amendment to or cancellation, in whole or in part, of this Agreement. Any amendment or cancellation shall be by mutual consent of the parties or their successors in interest except as provided otherwise in this Agreement or in Government Code Section 65865.1. For purposes of this section, the term “successor in interest” shall mean any person having a legal or equitable interest in the whole of the Property, or any portion thereof as to which such person wishes to amend or cancel this Agreement.
The procedure for proposing and adopting an amendment to, or cancellation of, in whole or in part, this Agreement shall be the same as the procedure for adopting and entering into this Agreement in the first instance. Notwithstanding the foregoing sentence, if the CITY initiates the proposed amendment to, or cancellation of, in whole or in part, this Agreement, CITY shall first give notice to the OWNER of its intention to initiate such proceedings at least sixty (60) days in advance of the giving the public notice of intention to consider the amendment or cancellation.
2.5.1 Amendment to Reflect Consistency With Future Amendments to the Construction Agreement. To the extent any future amendment to the Construction Agreement provides for modifications to rights or obligations that differ from or alter the same or similar rights or obligations contained in this Development Agreement, OWNER reserves the right to request an amendment to the Development Agreement to reflect any or all of such modifications.
641
-11-
2.5.2 Minor Modification. Upon the written application of OWNER, minor modifications and changes to the Development Plan including modifications to building design or footprint (not affecting minimum setbacks), parking layout and design, and landscape area design may be approved by the Director of the Planning Department without the need to amend this Development Agreement. Other changes in the Development Plan shall be processed pursuant to the City Zoning Ordinance. It is also contemplated by CITY and OWNER that OWNER may, from time to time, seek amendments to one or more of the Development Approvals. Any such amendments are contemplated by CITY and OWNER as being within the scope of this Agreement as long as they are consistent with the Land Use Regulations and shall, upon approval by CITY, continue to constitute the Development Approvals as referenced herein. The parties agree that any such modifications or amendments shall not constitute an amendment to this Agreement nor require an amendment to this Agreement.
2.6 Termination. This Agreement shall be deemed terminated and of no further effect upon the occurrence of any of the following events:
(a) Expiration of the stated term of this Agreement as set forth in Section 2.3.
(b) Entry of a final judgment setting aside, voiding or annulling the adoption of the ordinance approving this Agreement.
(c) The adoption of a referendum measure overriding or repealing the ordinance approving this Agreement.
(d) Completion of the Project in accordance with the terms of this Agreement including issuance of all required occupancy permits and acceptance by CITY or applicable public agency of all required dedications.
Termination of this Agreement shall not constitute termination of any other land use entitlements approved for the Property. Upon the termination of this Agreement, no party shall have any further right or obligation hereunder except with respect to any obligation to have been performed prior to such termination or with respect to any default in the performance of the provisions of this Agreement which has occurred prior to such termination or with respect to any obligations which are specifically set forth as surviving this Agreement. Upon such termination, any public facilities and services mitigation fees paid pursuant to Section 4.2 of this Agreement by OWNER to CITY for residential units on which construction has not yet begun shall be refunded to OWNER by CITY.
2.7 Notices.
(a) As used in this Agreement, “notice” includes, but is not limited to, the communication of notice, request, demand, approval, statement, report, acceptance, consent, waiver, appointment or other communication required or permitted hereunder. 642
-12-
(b) All notices shall be in writing and shall be considered given either: (i) when delivered in person, including, without limitation, by courier, to the recipient named below; or (ii) on the date of delivery shown on the return receipt, after deposit in the United States mail in a sealed envelope as either registered or certified mail with return receipt requested, and postage and postal charges prepaid, and addressed to the recipient named below. All notices shall be addressed as follows:
If to CITY:
Scott Ochoa, City Manager
City of Ontario
303 East "B" Street
Ontario, CA 91764
If to OWNER:
Dave Waters, Vice President
GDC Investments 13, L.P.
12770 El Camino Real, Suite 220
San Diego, CA 92130
with a copy to:
Ruben Duran, City Attorney
Best Best & Krieger, LLP
2855 E Guasti Road
Ontario, CA 91761
with a copy to:
Dennis Moser, President
Moser Ventures Inc.
45478 Blackfoot Way
Indian Wells, CA 92210
(c) Either party may, by notice given at any time, require subsequent notices to be given to another person or entity, whether a party or an officer or representative of a party, or to a different address, or both. Notices given before actual receipt of notice of change shall not be invalidated by the change.
3. DEVELOPMENT OF THE PROPERTY.
3.1 Rights to Develop. Subject to the terms of this Agreement including the Reservations of Authority, OWNER shall have a vested right to develop the Property in accordance with, and to the extent of, the Development Plan. The Project shall remain subject to all Subsequent Development Approvals required to complete the Project as contemplated by the Development Plan. Except as otherwise provided in this Agreement, the permitted uses of the Property, the density and intensity of use, the maximum height and size of proposed buildings, and provisions for reservation and dedication of land for public purposes shall be those set forth in the Development Plan.
3.2 Effect of Agreement on Land Use Regulations. Except as otherwise provided under the terms of this Agreement including the Reservations of Authority, the rules, regulations and official policies governing permitted uses of the Property, the density and intensity of use of the Property, the maximum height and size of proposed buildings, and the design, improvement and construction standards and specifications applicable to development of the Property shall be the Existing Land Use Regulations.
In connection with any Subsequent Development Approval, CITY shall exercise discretion in accordance with the same manner as it exercises its discretion under its police powers, including the Reservations of Authority set forth herein; provided 643
-13-
however, that such discretion shall not prevent development of the Property for the uses and to the density or intensity of development set forth in this Agreement.
3.3 Timing of Development. The parties acknowledge that OWNER cannot at this time predict when or the rate at which phases of the Property will be developed.
Such decisions depend upon numerous factors which are not within the control of OWNER, such as market orientation and demand, interest rates, absorption, completion and other similar factors. Since the California Supreme Court held in Pardee Construction Co. v. City of Camarillo (1984) 37 Ca1. 3d 465, that the failure of the parties therein to provide for the timing of development resulted in a later adopted initiative restricting the timing of development to prevail over such parties’ agreement, it is the parties’ intent to cure that deficiency by acknowledging and providing that OWNER shall have the right to develop the Property in such order and at such rate and at such times as OWNER deems appropriate within the exercise of its subjective business judgment.
3.4 Requirement for Public Infrastructure Improvements. Development of the Property is contingent in part on the phasing of area-wide infrastructure improvements over which the OWNER has control. The issuance of building permits by CITY for Model Units and Production Units is, in general, contingent on OWNER’s completion of needed infrastructure improvements and the availability of improvements and services to serve the Property.
3.4.1 Attached hereto as Exhibits “E” and “F” are a description and depiction, respectively, of the improvements needed for development of the Property. In the event of any discrepancy between Exhibit E and Exhibit F, Exhibit F shall control.
3.4.2 Subject to the prior submittal by OWNER and approval by CITY of a plan to provide sufficient public infrastructure for the construction of a maximum number of 2 buildings comprising a total of (12) Model Units, private common recreation facilities and sales facilities. CITY may issue a maximum of (5) building permits for Model Units, private common recreation facilities and sales facilities. The plan to be submitted by OWNER for CITY approval shall describe the utilities and other infrastructure necessary to provide sufficient fire protection and other public health and safety requirements for the Model Units and other facilities.
3.5 Changes and Amendments. The parties acknowledge that refinement and further development of the Project will require Subsequent Development Approvals and may demonstrate that changes are appropriate and mutually desirable in the Existing Development Approvals. In the event OWNER finds that a change in the Existing Development Approvals is necessary or appropriate, OWNER shall apply for a Subsequent Development Approval to effectuate such change and CITY shall process and act on such application in accordance with the Existing Land Use Regulations, except as otherwise provided by this Agreement including the Reservations of Authority.
If approved, any such change in the Existing Development Approvals shall be 644
-14-
incorporated herein as an addendum to Exhibit “C”, and may be further changed from time to time as provided in this Section. Unless otherwise required by law, as determined in CITY’s reasonable discretion, a change to the Existing Development Approvals shall be deemed “minor” and not require an amendment to this Agreement provided such change does not:
(a) Alter the permitted uses of the Property as a whole; or, (b) Increase the density or intensity of use of the Property as a whole; or,
(c) Increase the maximum height and size of permitted buildings; or, (d) Delete a requirement for the reservation or dedication of land for public purposes within the Property as a whole; or,
(e) Constitute a project requiring a subsequent or supplemental environmental impact report pursuant to Section 21166 of the Public Resources Code.
3.6 Reservations of Authority.
3.6.1 Limitations, Reservations and Exceptions. Notwithstanding any other provision of this Agreement, the CITY shall not be prevented from applying new rules, regulations and policies upon the OWNER, nor shall a development agreement prevent the CITY from denying or conditionally approving any subsequent development project application on the basis of such new rules, regulations and policies where the new rules, regulations and policies consist of the following:
(a) Processing fees by CITY to cover costs of processing applications for development approvals or for monitoring compliance with any development approvals;
(b) Procedural regulations relating to hearing bodies, petitions, applications, notices, findings, records and any other matter of procedure;
(c) Regulations, policies and rules governing engineering and construction standards and specifications applicable to public and private improvements, including all uniform codes adopted by the CITY and any local amendments to those codes adopted by the CITY; provided however that, OWNER shall have a vested right to develop the Property in accordance with, and to the extent of, the standards and specifications that are expressly identified in the Specific Plan;
645
-15-
(d) Regulations that may conflict with this Agreement and the Development Plan but that are reasonably necessary to protect the residents of the project and/or of the immediate community from a condition perilous to their health or safety;
(e) Regulations that do not conflict with those rules, regulations and policies set forth in this Agreement or the Development Plan; (f) Regulations that may conflict but to which the OWNER consents.
3.6.2 Subsequent Development Approvals. This Agreement shall not prevent CITY, in acting on Subsequent Development Approvals, from applying Subsequent Land Use Regulations that do not conflict with the Development Plan, nor shall this Agreement prevent CITY from denying or conditionally approving any Subsequent Development Approval on the basis of the Existing Land Use Regulations or any Subsequent Land Use Regulation not in conflict with the Development Plan.
3.6.3 Modification or Suspension by State or Federal Law. In the event that State or Federal laws or regulations, enacted after the Effective Date of this Agreement, prevent or preclude compliance with one or more of the provisions of this Agreement, such provisions of this Agreement shall be modified or suspended as may be necessary to comply with such State or Federal laws or regulations, provided, however, that this Agreement shall remain in full force and effect to the extent it is not inconsistent with such laws or regulations and to the extent such laws or regulations do not render such remaining provisions impractical to enforce. In the event OWNER alleges that such State or Federal laws or regulations preclude or prevent compliance with one or more provisions of this Agreement, and the CITY does not agree, the OWNER may, at its sole cost and expense, seek declaratory relief (or other similar non-monetary remedies); provided however, that nothing contained in this Section 3.6.3 shall impose on CITY any monetary liability for contesting such declaratory relief (or other similar non-monetary relief).
3.6.4 Intent. The parties acknowledge and agree that CITY is restricted in its authority to limit its police power by contract and that the foregoing limitations, reservations and exceptions are intended to reserve to CITY all of its police power which cannot be so limited. This Agreement shall be construed, contrary to its stated terms if necessary, to reserve to CITY all such power and authority which cannot be restricted by contract.
3.7 Public Works; Utilities. If OWNER is required by this Agreement to construct any public works facilities which will be dedicated to CITY or any other public agency upon completion, and if required by applicable laws to do so, OWNER shall perform such work in the same manner and subject to the same requirements as would be applicable to CITY or such other public agency should it have undertaken such construction. As a condition of development approval, OWNER shall connect the 646
-16-
Project to all utilities necessary to provide adequate water, recycled water, sewer, gas, electric, and other utility service to the Project. As a further condition of development approval, OWNER shall contract with the CITY for CITY-owned or operated utilities for this purpose, for such price and on such terms as may be available to similarly situated customers in the CITY.
(INSERT Specific Infrastructure Development Requirements)
3.7.1 OWNER agrees that development of the Property shall require the construction of water and recycled water improvements as described in Exhibit E and depicted in Exhibit F. OWNER agrees that no building permits shall be issued by CITY for Production Units prior to completion of the water and recycled water improvements as described in Exhibit E and depicted in Exhibit F. OWNER also agrees that recycled water shall be available and utilized by OWNER for all construction-related water uses including prior to, and during, any grading of the Property.
3.7.2 OWNER agrees that development of the Property shall require the construction of sewer improvements, as described in the attached Exhibit E and depicted in Exhibit F. OWNER agrees that no building permits shall be issued by CITY for Production Units prior to completion of the sewer improvements, as described in Exhibit E and depicted in Exhibit F.
3.7.3OWNER agrees that development of the Property shall require the extension of fiber optic communications improvements as described in the attached Exhibit E and depicted in Exhibit F. OWNER agrees that no building permits shall be issued by CITY for Production Units prior to completion of the fiber optic communication improvements, as described in Exhibit E and depicted in Exhibit F.
3.8 Acquisition of Offsite Provision of Real Property Interests. In any instance where OWNER is required by any Development Approval or Land Use Regulation and the Construction Agreement to construct any public improvement on land not owned by OWNER (“Offsite Improvements”), the CITY and OWNER shall cooperate in acquiring the necessary legal interest (“Offsite Property”) in accordance with the procedures set forth in Section 2.4 of the Construction Agreement. This section 3.8 is not intended by the parties to impose upon the OWNER an enforceable duty to acquire land or construct any public improvements on land not owned by OWNER, except to the extent that the OWNER elects to proceed with the development of the Project, and then only in accordance with valid conditions imposed by the CITY upon the development of the Project under the Subdivision Map Act or other legal authority.
3.8.1 CITY Acquisition of Non-Construction Agreement Offsite Property. In the event OWNER is required to construct any public improvements on land not owned by OWNER, but such requirement is not based upon the Construction Agreement, Sections 3.8.1 and 3.8.2 shall control the acquisition of the necessary property interest(s) (“Non-Construction Agreement Offsite Property”). 647
-17-
If the OWNER is unable to acquire such Non-Construction Agreement Offsite Property, and following the written request from the OWNER to CITY, CITY agrees to use reasonable and diligent good faith efforts to acquire the NonConstruction Agreement Offsite Property from the owner or owners of record by negotiation to the extent permitted by law and consistent with this Agreement. If CITY is unable to acquire the Non-Construction Agreement Offsite Property by negotiation within thirty (30) days after OWNER’S written request, CITY shall, initiate proceedings utilizing its power of eminent domain to acquire that NonConstruction Agreement Subject Property at a public hearing noticed and conducted in accordance with California Code of Civil Procedure Section 1245.235 for the purpose of considering the adoption of a resolution of necessity concerning the Non-Construction Agreement Offsite Property, subject to the conditions set forth in this Section 3.8. The CITY and OWNER acknowledge that the timelines set forth in this Section 3.8.1 represent the maximum time periods which CITY and OWNER reasonably believe will be necessary to complete the acquisition of any Non-Construction Agreement Offsite Property. CITY agrees to use reasonable good faith efforts to complete the actions described within lesser time periods, to the extent that it is reasonably able to do so, consistent with the legal constraints imposed upon CITY.
3.8.2 Owner’s Option to Terminate Proceedings. CITY shall provide written notice to OWNER no later than fifteen (15) days prior to making an offer to the owner of the Non-Construction Agreement Offsite Property. At any time within that fifteen (15) day period, OWNER may, at its option, notify CITY that it wants CITY to cease all acquisition proceedings with respect to that Non-Construction Agreement Offsite Property, whereupon CITY shall cease such proceedings.
CITY shall provide written notice to OWNER no later than fifteen (15) days prior to the date of the hearing on CITY’S intent to consider the adoption of a resolution of necessity as to any Non-Construction Agreement Offsite Property.
At any time within that fifteen (15) day period, OWNER may, at its option, notify CITY that it wants CITY to cease condemnation proceedings, whereupon CITY shall cease such proceedings. If OWNER does not notify CITY to cease condemnation proceedings within said fifteen (15) day period, then the CITY may proceed to consider and act upon the Non-Construction Agreement Offsite Property resolution of necessity. If CITY adopts such resolution of necessity, then CITY shall diligently institute condemnation proceedings and file a complaint in condemnation and seek an order of immediate possession with respect to the Non-Construction Agreement Offsite Property.
3.9 Regulation by Other Public Agencies. It is acknowledged by the parties that other public agencies not within the control of CITY possess authority to regulate aspects of the development of the Property separately from or jointly with CITY and this Agreement does not limit the authority of such other public agencies. CITY agrees to cooperate fully, at no cost to CITY, with OWNER in obtaining any required permits or compliance with the regulations of other public agencies provided such cooperation is not in conflict with any laws, regulations or policies of the CITY. 648
-18-
3.10 Tentative Tract Maps; Extension. With respect to applications by OWNER for tentative subdivision maps for portions of the Property, CITY agrees that OWNER may file and process tentative maps in accordance with Chapter 4.5 (commencing with Section 66498.1) of Division 2 of Title 7 of the California Government Code and the applicable provisions of CITY’s subdivision ordinance, as the same may be amended from time to time. In accordance with the provisions of Section 66452.6 of the Government Code, each tentative subdivision map or tentative parcel map, heretofore or hereafter approved in connection with development of the Property, shall be deemed to have been granted an extension of time to and until the date that is five (5) years following the Effective Date of this Agreement.; The CITY’s City Council may, in its discretion, extend any such map for an additional period of up to five (5) years beyond its original term, so long as the subdivider files a written request for an extension with the City prior to the expiration of the initial five (5) year term.
4. PUBLIC BENEFITS.
4.1 Intent. The parties acknowledge and agree that development of the Property will result in substantial public needs that will not be fully met by the Development Plan and further acknowledge and agree that this Agreement confers substantial private benefits on OWNER that should be balanced by commensurate public benefits. Accordingly, the parties intend to provide consideration to the public to balance the private benefits conferred on OWNER by providing more fully for the satisfaction of the public needs resulting from the Project.
4.2 Development Impact Fees.
4.2.1 Amount of Development Impact Fee. Development Impact Fees (DIF) shall be paid by OWNER. The Development Impact Fee amounts to be paid by OWNER shall be the amounts that are in effect at the time such amounts are due. Nothing contained in this Agreement shall affect the ability of the CITY to impose new Development Impact Fees or amend the amounts of existing Development Impact Fees. Additionally, nothing contained in this Agreement shall affect the ability of other public agencies that are not controlled by CITY to impose and amend, from time to time, Development Impact Fees established or imposed by such other public agencies, even though such Development Impact Fees may be collected by CITY.
4.2.2 Time of Payment. The Development Impact Fees required pursuant to Subsection 4.2.1 shall be paid to CITY prior to the issuance of building permit for each applicable residential or other unit, except for the Open Space and Habitat Acquisition Development Impact fee, which shall be paid by OWNER to CITY prior to the issuance of a grading permit. Deferrals of the payment of Development Impact Fees may be granted pursuant to a separate agreement approved by City pursuant to City policy. Any existing Development Impact Fee (DIF) credits held by the Owner or any affiliated entity shall be applied toward the payment of DIFs as required under Subsection 4.2.1
649
-19-
4.2.3 Parkland and Quimby Act Fees. Pursuant to the General Plan (Ontario Plan) Goal PR1, Policy PR1-5 (achievement of a park standard of 5 acres of parkland per 1,000 residents) OWNER shall provide improved parks, developed in accordance with the City’s park standards in an amount equal to two (2) acres per 1,000 of projected population without credit, reimbursement, offset or consideration from City. Such areas shall either be dedicated to the City or transferred to a homeowners’ association. If approved by the City Manager, OWNER may satisfy this requirement through the development of non-public recreation facilities such as private recreational clubhouses or pool facilities.
Credit for such private recreational facilities areas shall be limited to a maximum of 50% of the foregoing park development requirement. If OWNER’s Project does not provide dedicated and developed park acreage equal to two (2) acres per 1,000 projected population, OWNER shall pay a fee in-lieu equal to the per acre estimated costs of acquisition and development of parkland in the City’s Development Impact Fee for the calculated park acreage deficiency. Such in-lieu fee shall be due and payable prior to the issuance of the first building permit for Production Units issued to OWNER. Any park dedication and/or improvements in excess of such two (2) acres per thousand standard, provided such park has been developed in accordance with the City’s park standards and is open to the public generally, shall entitle OWNER to a credit toward its obligations under the Quimby Act (Gov. Code, § 64477) and the City’s implementing ordinance and/or resolution (collectively “Quimby Act Obligations”), and to the extent OWNER’s Quimby Act Obligations are satisfied, OWNER shall be entitled to have the City acquire such developed and publicly available parks as Non-Program Interests in accordance with Section 4.3.3 below. (Other provisions will be added that are Project-specific, if applicable).
4.3 Responsibility for Construction of Public Improvements.
4.3.1 Timely Construction of Public Infrastructure. The phasing of the areawide infrastructure construction within Ontario Ranch will be as approved by the CITY. OWNER shall be responsible for the timely construction and completion of all public infrastructure required for the Project as shown on the attached Exhibit “F” and any and all tentative tract map conditions. Unless otherwise specified in the Subdivision Agreement/Tract Map conditions, all other required Improvements for each Tract Map, shall be completed and operational prior to, and as a condition precedent to, OWNER requesting and CITY’s granting of the first building permit for Production Units for each such Tract Map.
All Infrastructure and Improvements shall be completed as required by the Subdivision Agreement/Tract Map conditions for Tract No. 20730.
4.3.2 Construction of DIF Program Infrastructure (Construction Agreement). To the extent OWNER is required to construct and completes construction of public improvements that are included in CITY’s Development Impact Fee Program and the Construction Agreement between CITY and NMC Builders LLC, CITY agrees that CITY shall issue DIF Credit in accordance with the provisions of the Construction Agreement and any amendments thereto. Use of DIF Credit issued 650
-20-
to OWNER as a member of NMC Builders LLC to offset OWNER’s DIF payment obligations shall also be subject to the provisions of the Construction Agreement and any amendments thereto.
4.3.3 Construction of DIF Program Infrastructure (Non-Construction Agreement). To the extent OWNER is required to construct and completes construction of public improvements that are included in CITY’s Development Impact Fee Program and such public improvements are not included the Construction Agreement between CITY and NMC Builders LLC, CITY agrees that CITY shall issue DIF Credit in accordance with the provisions of a separate Fee Credit Agreement between CITY and OWNER. Limitation on the use of DIF Credit issued to OWNER to offset OWNER’s DIF payment obligations shall also be subject to the provisions of a separate Fee Credit Agreement. CITY and OWNER agree that the Fee Credit Agreement between CITY and OWNER shall comply with CITY’s adopted policies applicable to such agreements.
4.4 Affordable Housing Requirement.
4.4.1 Affordable Housing- Number of Units. OWNER shall provide a minimum number of affordable housing units, equivalent to 10% of the OWNER’s total approved residential units within the Project, that are affordable to very low, lowand moderate-income households. Such requirement for affordable housing shall be met through one, or a combination of one or more, of the options provided in the following Sections 4.4.2.1 through 4.4.2.5. For the purposes of this Section, any term not defined in this Agreement shall be as defined by California Community Redevelopment Law (California Health and Safety Code Section 33000 et seq.).
4.4.2 Affordability Spread. Of the total number of residential dwelling units specified in Section 4.4.1, to be constructed or rehabilitated pursuant to Sections
4.4.2.1 or 4.4.2.2 respectively, thirty percent (30%) shall be available to very low income, thirty percent (30%) shall be available to low income and forty percent (40%) shall be available to moderate income households. “Households” shall be as defined by California Health and Safety Code Section 50053.
4.4.2.1 New Construction. If OWNER elects to fully or partially satisfy the affordable housing requirement by the construction of new residential units, it shall construct and restrict the affordability of residential dwelling units within its Project or, at OWNER’s option and with the approval of the City, within another project elsewhere within the City. The affordable units constructed shall be intermingled with other units as part of the Project, and shall be built to the same construction, design and aesthetic standards, as well as number of rooms, as other units constructed as part of that OWNER’s Project. In addition, the percentage ratio of affordable units offered for sale versus those offered for rent shall equal the percentage ratio of other units offered for sale versus for rent within OWNER’s Project. 651
-21-
Such construction shall be completed no later than the date that is five (5) years following the issuance of the first building permit for OWNER’s Project; provided however that to the extent OWNER has not constructed the required percentage of units, based on the number of building permits for non-restricted units, OWNER shall, prior to the issuance of such building permits, provide security (in the form and substance approved by the City Manager and City Attorney) to City in order to ensure the faithful completion of such required percentage of construction of affordable units.
If OWNER elects the option of constructing new affordable units, a detailed Affordable Housing Agreement specifying terms for the allowable monthly housing costs or rents (as applicable) and maintenance and occupancy standards shall be prepared, executed and recorded against such units as a condition to the issuance of a building permit. The Affordable Housing Agreement shall hold a recorded priority position senior to any other nonstatutory lien or encumbrance affecting the unit.
4.4.2.2 Rehabilitation. If OWNER elects to fully or partially satisfy the affordable housing requirement by the substantial rehabilitation of existing residential units in the City, it shall substantially rehabilitate and restrict the affordability of, the number of residential units specified in Section 4.4.1, provided that such units shall be provided elsewhere within the City. The rehabilitation work shall be substantial and of high quality and shall also address any deferred property maintenance issues on the property. “Substantial rehabilitation” shall mean rehabilitated multi-family rented dwelling units with three or more units and the value of the rehabilitation constitutes 25 percent of the after rehabilitation value of the dwelling, inclusive of land value pursuant to Health and Safety Code Section 33413(b)(2)(A)(iii-iv) as such section exists as of the Effective Date of this Agreement. If OWNER chooses the option of rehabilitation of existing housing units within the City, a detailed Affordable Housing Agreement specifying the terms for the allowable month housing costs or rents (as applicable) and maintenance and occupancy standards shall be prepared, executed and recorded against such units as a condition to the issuance of a building permit. Such rehabilitation shall be completed no later than the date that is five (5) years following the issuance of the first building permit for OWNER’s Project; provided however that to the extent OWNER has not rehabilitated the required percentage of units, based on the number of building permits, OWNER shall, prior to the issuance of such building permits, provide security (in the form and substance approved by the City Manager and City Attorney) to the City in order to ensure the faithful completion of such required percentage of rehabilitation.
4.4.2.3 In-Lieu Fee. If OWNER has not fully complied with the requirements of Section 4.4.1 by providing the minimum number of affordable units through the construction of new affordable units or by the substantial rehabilitation of existing units, shall pay an “Affordability InLieu Fee”. If OWNER has not provided any affordable residential units by 652
-22-
construction or rehabilitation, the Affordability In-Lieu fee shall be equal to Three Dollars Forty-Six Cents ($3.46) per square foot of residential development within OWNER’s Project or, if pre-paid as set forth below, Three Dollars and Four Cents ($3.04) per square foot of residential development within OWNER’s Project. If OWNER has partially complied with the requirements of Section 4.4.1 by construction or rehabilitation of less than the minimum number of units, then the Affordability In-lieu Fee shall be recalculated and reduced in consideration of the number and type of affordable units provided. The Affordability In-Lieu Fee shall be paid by OWNER to City no later than prior to the issuance of each building permit within OWNER’s Project based on the square footage of the residential unit for which such building permit is sought; provided however that OWNER may, at OWNER’s election, pre-pay such Affordability In-Lieu Fee by paying such Affordability In-Lieu Fee within thirty (30) days following the earliest discretionary approval by the City for OWNER’s Project, including, but not limited to, any general plan amendment, specific plan adoption, development agreement, tentative map approval, variance, conditional use permit, or resolution of intention to form any public financing mechanism.
The Three Dollars Forty-Six Cents ($3.46) and Three Dollars and Four Cents ($3.04) per square foot amounts shall automatically be increased annually, commencing on July 1, 2025, and automatically each July 1 thereafter. Such adjustment shall be based on the percentage increase (but no decrease) in the Consumer Price Index (Riverside - San Bernardino - Ontario, CA), (December 2017=100) over the preceding year. The prepaid Affordability In-Lieu Fee shall be calculated based on the maximum floor area ratio (FAR) permitted within the General Plan and any applicable FAR contained within the applicable specific plan, whichever is greater, and the Maximum Development Density. For purposes of this Agreement, “Maximum Development Density” shall be determined by multiplying the OWNER’s Project’s density for residential development potential as set forth in the General Plan or the applicable Specific Plan, whichever is less, by the net acreage of land within OWNER’s Project. All “Affordability InLieu Fees” collected by the City shall be used to promote the construction of affordable housing within the City.
4.4.2.4 Affordability Covenants. Prior to the issuance of the first building permit for any affordable unit, the CITY and OWNER shall enter into an Affordable Housing Agreement Affordability shall be assured for a period of forty-five (45) years for for-sale units and fifty-five (55) years for rentals.
For rental units, base rents shall be established by the CITY and rental adjustments required by the CITY shall be performed on an annual basis.
In addition, the Affordable Housing Agreement shall impose maximum occupancy limits of two (2) occupants per bedroom plus one (1) additional occupant per dwelling unit, and a requirement for the owner or tenant to properly maintain each dwelling unit.
4.4.2.5 Transfer of Affordable Project. No transfer of title to any affordable 653
-23-
housing project shall occur without the prior written consent of the CITY. In the event OWNER transfers title to any affordable housing project required to be constructed pursuant to this Agreement to a non-profit entity, or other entity, that receives an exemption from ad valorem real property taxes, the CITY shall be required to assure payment of an annual in lieu fee to the CITY on July 1 of each year equal to one-tenth of one percent (0.1%) of the assessed value of such project. The CITY may permit OWNER to satisfy this obligation by recorded covenants against the property and enforceable against said entity by the CITY. Any such covenants shall be approved by the Planning Director and the City Attorney.
4.5 Schools Obligations.
4.5.1 Written Evidence of Compliance with Schools Obligations.
OWNER shall, either through joint or individual agreements between OWNER and the applicable school district(s), shall satisfy its new school obligations. The new school obligations for the Mountain View School District in the Ontario Ranch area have been projected to include the acquisition or dedication of school sites for, and construction of, up to eight (8) schools. Of these eight (8) schools, six (6) are to be elementary (K-5) grade schools and two (2) are to be middle grade schools. The new school obligations for the Chaffey Joint Union High School District in the Ontario Ranch area have been projected to include the dedication of a school site for, and construction of, an additional high school.
The new school obligations for the applicable school district shall be met by a combination of the following: (1) designating and dedicating school site(s) within the Property as set forth in the General Plan, and/or (2) paying school impact fees, (3) entering into a joint mitigation agreement or individual mitigation agreements, or (4) any combination of the foregoing. Written evidence of approval by the applicable school district that OWNER has met their school obligations may be required by the City as the condition to the issuance by the City of any entitlements for OWNER’s Project. In the event OWNER is unable to provide such written evidence from the applicable school district(s), the City shall have the right to decline to honor any DIF Credit, Certificates of MDD Availability, Certificates of Storm Water Treatment Capacity Availability, or any combination thereof, presented by such OWNER, without liability to the City. To the extent that a joint mitigation agreement is approved by the applicable school district(s), and OWNER is a participant in good standing in such mitigation agreement, OWNER shall be deemed to have mitigated its new school obligations under this Section 4.4.1.
4.6 Net MDD/Water Availability Equivalents.
4.6.1 Assigned Net MDD/Water Availability Equivalents. The City has agreed with NMC Builders LLC to reserve exclusively for Members of NMC Builders, including OWNER, Net MDD made available through the construction of water system improvements funded by NMC Builders LLC. NMC Builders has assigned to OWNER its allocable share of the Net MDD issued by City. The 654
-24-
provisions of the Construction Agreement Amendment requires that the City shall not approval a final tract map or issue building permits or certificates of occupancy for the area of development within the New Model Colony served by the water system improvements funded by NMC Builders LLC, except to the bearer of an Assignment of Net MDD Water Availability.
4.6.2 Use of Assigned Net MDD Water Availability. OWNER shall provide evidence of sufficient Net MDD Water Availability Equivalents (or portions thereof) prior to and as a condition precedent to, the City’s approval of any and all tract maps for the Property. The amount of Net MDD Water Availability Equivalents required for City’s approval of a tract map shall be based upon water demand factors and assumptions listed in Exhibit C-2R of the Construction Agreement Amendment as “Water Demand Equivalents by Land Use” for each land use category.
4.6.3 Requirement for other Water System Improvements. A Certificate of Net MDD Availability is evidence only of available water capacity and does not satisfy any other conditions applicable to an OWNER’s Project, including those relating to design and construction of master-planned potable water and recycled water transmission and distribution system for the respective pressure zone and other public infrastructure requirements.
4.6.4 Effectiveness of Agreement. Notwithstanding anything set forth in this Agreement, CITY and OWNER each acknowledge, confirm, and agree that (i) the CITY approval of this Agreement and (ii) the effectiveness of this Agreement, in each case, are conditioned upon OWNER’s admission to NMC Builders as a “Member” (if not already a Member) thereof pursuant to the terms and conditions of the operating agreement of NMC Builders within thirty (30) days following the Effective Date of this Agreement. OWNER’S failure to maintain membership in NMC Builders LLC is and shall be a Default under this Agreement
4.7 Storm Water Capacity Availability.
4.7.1 Requirement for Storm Water Treatment Capacity Availability. OWNER shall provide evidence of sufficient Storm Water Treatment Capacity Availability as reserved in a Certificate of Storm Water Treatment Capacity Availability the same manner and subject to the same limitations as provided for the assignment of Certificates of Net MDD Availability in Section 4.7 of this Agreement.
4.7.2 Use of Storm Water Treatment Capacity Availability. The amount of Storm Water Treatment Capacity Availability required for the issuance of a grading permit to OWNER shall be based upon the Net Residential Acreage of the area to be graded regardless of the corresponding use.
4.7.3 Requirement for other Storm Water Improvements. The Certificate of Storm Water Treatment Capacity Availability is evidence only of available storm water treatment capacity and does not satisfy any other conditions applicable to 655
-25-
a particular development project, including those relating to on-site water treatment, water quality, connection to the storm water collection system, or other public infrastructure requirements.
4.8 Maintenance of Open Space. OWNER shall provide for the ongoing maintenance of all park, common areas and open space areas within the Project as more particularly set forth in the Specific Plan, through a homeowners’ association as approved by the CITY. Covenants, conditions and restrictions establishing any homeowners’ association shall be approved by the Planning Director and City Attorney.
4.9 Compliance with Public Benefits Requirements.
4.10.1 Failure to Provide Public Benefits. In the event OWNER fails or refuses to comply with any condition referenced in Section 4.1 through 4.10, or challenges (whether administratively or through legal proceedings) the imposition of such conditions, OWNER shall be deemed in default of this Agreement pursuant to Section 8.4 hereof, thereby entitling the City to any and all remedies available to it, including, without limitation, the right of the City to withhold OWNER’s Project-related building permits, certificates of occupancy, or discretionary approvals, without liability.
5. FINANCING OF PUBLIC IMPROVEMENTS.
5.1 Financing Mechanism(s). In accordance with the Memorandum of Agreement between the CITY and NMC Builders, CITY will cooperate with OWNER in the formation of a CFD, or CFDs, to include all of the Project, to provide a financing mechanism to reimburse the OWNER for funds paid to NMC Builders LLC for OWNER’s share of the costs of public infrastructure pursuant to the Construction Agreement and to acquire other public facilities constructed by OWNER subject to the provisions of the Memorandum of Agreement between CITY and NMC Builders LLC.
Notwithstanding such reimbursements and acquisitions, OWNER shall remain entitled to DIF Credits as provided for in Article 3 of the Construction Agreement and/or as provided for in a separate Fee Credit Agreement between CITY and OWNER. OWNER agrees that, prior to the recordation of any Tract Map for the Property, the Property shall be included in a CFD to finance City services through annual special taxes that will initially be $1,426.38 per Single Family Detached Dwelling Unit, $1,236.46 per MultipleFamily Dwelling Unit, $1,036.38 per Gated Apartment Community Dwelling Unit, and $.26 per square foot for Non-Residential buildings. These amounts shall be subject to an automatic increase at a rate not to exceed four (4%) percent per year, unless otherwise modified by the CITY. CITY shall be the sole and exclusive lead agency in the formation of any CFD, assessment district or other public financing mechanism within the Property; provided however, that the proceeds of any such CFD, assessment district, or financing mechanism may be used, subject to restrictions that may be imposed by applicable law, for the purposes of acquiring, constructing or maintaining public facilities to be owned or operated by other public agencies, including, without 656
-26-
limitation those facilities owned or operated by a school district. In addition to the rights of the CITY pursuant to section 5.2 hereof, CITY shall have the right, but not the obligation, to condition the formation of any CFD, assessment district or other public financing mechanism within the Property on the OWNER mitigating all Project-related impacts to the applicable school district(s) as required by such school district(s).
Written evidence by such school district(s) may be required by the CITY as the condition to the formation of any CFD, assessment district or other public financing mechanism within the Property, or any steps preliminary thereto, including, without limitation, the adoption of any resolution of intention to form such CFD, assessment district or other public financing mechanism within the Property. It is not the intent of the parties hereto, by this provision, to prohibit or otherwise limit the City’s ability to take any and all necessary steps requisite to the formation of the CFD to finance City services through annual special taxes as set forth in this Section 5.1. Formation of any CFD, assessment district or other public financing mechanism within the Property, shall be subject to CITY’s ability to make all findings required by applicable law and complying with all applicable legal procedures and requirements including, without limitation, CITY’s public financing district policies as such policies may be amended from time to time. Notwithstanding the foregoing, it is acknowledged and agreed by the parties that nothing contained in this Agreement shall be construed as requiring CITY or the City Council to form any such district or to issue and sell bonds.
6. REVIEW FOR COMPLIANCE.
6.1 Periodic and Special Reviews.
6.1.1 Time for and Initiation of Periodic Review. The CITY shall review this Agreement every twelve (12) months from the Effective Date in order to ascertain the good faith compliance by the OWNER with the terms of this Agreement. The OWNER shall submit an Annual Monitoring Report to CITY, in a form acceptable to the City Manager, along with any applicable processing charge within ten (10) days after each anniversary date of the Effective Date of this Agreement. Within fifteen (15) days after the receipt of the Annual Monitoring Report, CITY shall review the Annual Monitoring Report. Prior to the expiration of the fifteen (15) day review period, CITY shall either issue a notice of continuing compliance or a notice of non-compliance and a notice of CITY’s intent to conduct a Special Review pursuant to Sections 6.1.2 through 6.1.6. Issuance of a notice of continuing compliance may be issued by the City Manager or his designee.
6.1.2 Initiation of Special Review. A special review may be called either by agreement between the parties or by initiation in one or more of the following ways:
(1) Recommendation of the Planning staff;
657
-27-
(2) Affirmative vote of at least four (4) members of the Planning Commission; or
(3) Affirmative vote of at least three (3) members of the City Council.
6.1.3 Notice of Special Review. The City Manager shall begin the special review proceeding by giving notice that the CITY intends to undertake a special review of this Agreement to the OWNER. Such notice shall be given at least ten (10) days in advance of the time at which the matter will be considered by the Planning Commission.
6.1.4 Public Hearing. The Planning Commission shall conduct a hearing at which the OWNER must demonstrate good faith compliance with the terms of this Agreement. The burden of proof on this issue is upon the OWNER.
6.1.5 Findings Upon Public Hearing. The Planning Commission shall determine upon the basis of substantial evidence whether or not the OWNER has, for the period under review, complied in good faith with the terms and conditions of this Agreement.
6.1.6 Procedure Upon Findings.
(a) If the Planning Commission finds and determines on the basis of substantial evidence that the OWNER has complied in good faith with the terms and conditions of this Agreement during the period under review, the review for that period is concluded.
(b) If the Planning Commission finds and determines on the basis of substantial evidence that the OWNER has not complied in good faith with the terms and conditions of this Agreement during the period under review, the Planning Commission may recommend to the City Council to modify or terminate this Agreement. (c) The OWNER may appeal a determination pursuant to
paragraph (b) to the City Council in accordance with the CITY's rule for consideration of appeals in zoning matters generally.
6.2 Proceedings Upon Modification or Termination. If, upon a finding under Section 6.1.6(b), the CITY determines to proceed with modification or termination of this Agreement, the CITY shall give notice to the property OWNER of its intention so to do.
The notice shall contain:
(a) The time and place of the hearing;
(b) A statement as to whether or not the CITY proposes to terminate or to modify this Agreement; and
658
-28-
(c) Other information that the CITY considers necessary to inform the OWNER of the nature of the proceeding.
6.3 Hearing on Modification or Termination. At the time and place set for the hearing on modification or termination, the OWNER shall be given an opportunity to be heard. The OWNER shall be required to demonstrate good faith compliance with the terms and conditions of this Agreement. The burden of proof on this issue shall be on the OWNER. If the City Council finds, based upon substantial evidence in the administrative record, that the OWNER has not complied in good faith with the terms and conditions of the agreement, the City Council may terminate or modify this Agreement and impose those conditions to the action it takes as it considers necessary to protect the interests of the CITY. The decision of the City Council shall be final, subject only to judicial review pursuant to Section 1094.5 of the Code of Civil Procedure.
6.4 Certificate of Agreement Compliance. If, at the conclusion of a Periodic or Special Review, OWNER is found to be in compliance with this Agreement, CITY shall, upon written request by OWNER, issue a Certificate of Agreement Compliance (“Certificate”) to OWNER stating that after the most recent Periodic or Special Review and based upon the information known or made known to the Planning Director and City Council that (1) this Agreement remains in effect and (2) OWNER is not in default.
The Certificate shall be in recordable form, shall contain information necessary to communicate constructive record notice of the finding of compliance, shall state whether the Certificate is issued after a Periodic or Special Review and shall state the anticipated date of commencement of the next Periodic Review. OWNER may record the Certificate with the County Recorder. Whether or not the Certificate is relied upon by assignees or other transferees or OWNER, CITY shall not be bound by a Certificate if a default existed at the time of the Periodic or Special Review, but was concealed from or otherwise not known to the Planning Director or City Council.
7. [RESERVED]
8. DEFAULT AND REMEDIES.
8.1 Remedies in General. It is acknowledged by the parties that CITY would not have entered into this Agreement if it were to be liable in damages under this Agreement, or with respect to this Agreement or the application thereof.
In general, each of the parties hereto may pursue any remedy at law or equity available for the breach of any provision of this Agreement, except that CITY shall not be liable in damages to OWNER, or to any successor in interest of OWNER, or to any other person, and OWNER covenants not to sue for damages or claim any damages:
(a) For any breach of this Agreement or for any cause of action which arises out of this Agreement; or
659
-29-
(b) For the taking, impairment or restriction of any right or interest conveyed or provided under or pursuant to this Agreement; or
(c) Arising out of or connected with any dispute, controversy or issue regarding the application or interpretation or effect of the provisions of this Agreement.
8.2 Specific Performance. The parties acknowledge that money damages and remedies at law generally are inadequate and specific performance and other nonmonetary relief are particularly appropriate remedies for the enforcement of this Agreement and should be available to all parties for the following reasons:
(a) Money damages are unavailable against CITY as provided in Section 8.1 above.
(b) Due to the size, nature and scope of the project, it may not be practical or possible to restore the Property to its natural condition once implementation of this Agreement has begun. After such implementation, OWNER may be foreclosed from other choices it may have had to utilize the Property or portions thereof. OWNER has invested significant time and resources and performed extensive planning and processing of the Project in agreeing to the terms of this Agreement and will be investing even more significant time and resources in implementing the Project in reliance upon the terms of this Agreement, and it is not possible to determine the sum of money which would adequately compensate OWNER for such efforts.
8.3 Release. Except for nondamaged remedies, including the remedy of specific performance and judicial review as provided for in Section 6.5, OWNER, for itself, its successors and assignees, hereby releases the CITY, its officers, agents and employees from any and all claims, demands, actions, or suits of any kind or nature arising out of any liability, known or unknown, present or future, including, but not limited to, any claim or liability, based or asserted, pursuant to Article I, Section 19 of the California Constitution, the Fifth Amendment of the United States Constitution, or any other law or ordinance which seeks to impose any other liability or damage, whatsoever, upon the CITY because it entered into this Agreement or because of the terms of this Agreement.
8.4 Termination or Modification of Agreement for Default of OWNER. Subject to the provisions contained in Subsection 6.3 herein, CITY may terminate or modify this Agreement for any failure of OWNER to perform any material duty or obligation of OWNER under this Agreement, or to comply in good faith with the terms of this Agreement (hereinafter referred to as “default”); provided, however, CITY may terminate or modify this Agreement pursuant to this Section only after providing written notice to OWNER of default setting forth the nature of the default and the actions, if any, required by OWNER to cure such default and, where the default can be cured, OWNER has failed to take such actions and cure such default within 60 days after the effective date of such notice or, in the event that such default cannot be cured within such 60 day period but can be cured within a longer time, has failed to commence the actions 660
-30-
necessary to cure such default within such 60 day period and to diligently proceed to complete such actions and cure such default.
8.5 Termination of Agreement for Default of CITY. OWNER may terminate this Agreement only in the event of a default by CITY in the performance of a material term of this Agreement and only after providing written notice to CITY of default setting forth the nature of the default and the actions, if any, required by CITY to cure such default and, where the default can be cured, CITY has failed to take such actions and cure such default within 60 days after the effective date of such notice or, in the event that such default cannot be cured within such 60 day period but can be cured within a longer time, has failed to commence the actions necessary to cure such default within such 60 day period and to diligently proceed to complete such actions and cure such default.
9. THIRD PARTY LITIGATION.
9.1 General Plan Litigation. CITY has determined that this Agreement is consistent with its Comprehensive General Plan, as such General Plan exists as of the Effective Date (“General Plan”), and that the General Plan meets all requirements of law. OWNER has reviewed the General Plan and concurs with CITY’s determination.
CITY shall have no liability in damages under this Agreement for any failure of CITY to perform under this Agreement or the inability of OWNER to develop the Property as contemplated by the Development Plan of this Agreement as the result of a judicial determination that on the Effective Date, or at any time thereafter, the General Plan, or portions thereof, are invalid or inadequate or not in compliance with law.
9.2 Third Party Litigation Concerning Agreement. OWNER shall defend, at its expense, including attorneys’ fees, indemnify, and hold harmless CITY, its agents, officers and employees from any claim, action or proceeding against CITY, its agents, officers, or employees to attack, set aside, void, or annul the approval of this Agreement or the approval of any permit granted pursuant to this Agreement. CITY shall promptly notify OWNER of any such claim, action or proceeding, and CITY shall cooperate in the defense. If CITY fails to promptly notify OWNER of any such claim, action or proceeding, or if CITY fails to cooperate in the defense, OWNER shall not thereafter be responsible to defend, indemnify, or hold harmless CITY. CITY may in its discretion participate in the defense of any such claim, action or proceeding.
9.3 Indemnity. In addition to the provisions of 9.2 above, OWNER shall indemnify and hold CITY, its officers, agents, employees and independent contractors free and harmless from any liability whatsoever, based or asserted upon any act or omission of OWNER, its officers, agents, employees, subcontractors and independent contractors, for property damage, bodily injury, or death (OWNER’s employees included) or any other element of damage of any kind or nature, relating to or in any way connected with or arising from the activities contemplated hereunder, including, but not limited to, the study, design, engineering, construction, completion, failure and conveyance of the public improvements, save and except claims for damages arising through the sole active negligence or sole willful misconduct of CITY. OWNER shall defend, at its expense, including attorneys’ fees, CITY, its officers, agents, employees 661
-31-
and independent contractors in any legal action based upon such alleged acts or omissions. CITY may in its discretion participate in the defense of any such legal action.
9.4 Environment Assurances. OWNER shall indemnify and hold CITY, its officers, agents, and employees free and harmless from any liability, based or asserted, upon any act or omission of OWNER, its officers, agents, employees, subcontractors, predecessors in interest, successors, assigns and independent contractors for any violation of any federal, state or local law, ordinance or regulation relating to industrial hygiene or to environmental conditions on, under or about the Property, including, but not limited to, soil and groundwater conditions, and OWNER shall defend, at its expense, including attorneys’ fees, CITY, its officers, agents and employees in any action based or asserted upon any such alleged act or omission. CITY may in its discretion participate in the defense of any such action.
9.5 Reservation of Rights. With respect to Sections 9.2, 9.3 and 9.4 herein, CITY reserves the right to either (1) approve the attorney(s) which OWNER selects, hires or otherwise engages to defend CITY hereunder, which approval shall not be unreasonably withheld, or (2) conduct its own defense, provided, however, that OWNER shall reimburse CITY forthwith for any and all reasonable expenses incurred for such defense, including attorneys’ fees, upon billing and accounting therefor.
9.6 Survival. The provisions of this Sections 9.1 through 9.6, inclusive, shall survive the termination of this Agreement.
10. MORTGAGEE PROTECTION.
The parties hereto agree that this Agreement shall not prevent or limit OWNER, in any manner, at OWNER’s sole discretion, from encumbering the Property or any portion thereof or any improvement thereon by any mortgage, deed of trust or other security device securing financing with respect to the Property. CITY acknowledges that the lenders providing such financing may require certain Agreement interpretations and modifications and agrees upon request, from time to time, to meet with OWNER and representatives of such lenders to negotiate in good faith any such request for interpretation or modification. CITY will not unreasonably withhold its consent to any such requested interpretation or modification provided such interpretation or modification is consistent with the intent and purposes of this Agreement. Any Mortgagee of the Property shall be entitled to the following rights and privileges:
(a) Neither entering into this Agreement nor a breach of this Agreement shall defeat, render invalid, diminish or impair the lien of any mortgage on the Property made in good faith and for value, unless otherwise required by law. (b) The Mortgagee of any mortgage or deed of trust encumbering the Property, or any part thereof, which Mortgagee, has submitted a request in writing to the CITY in the manner specified herein for giving notices, shall be entitled to receive written notification from CITY of any default by OWNER in the performance of OWNER’s obligations under this Agreement.
662
-32-
(c) If CITY timely receives a request from a Mortgagee requesting a copy of any notice of default given to OWNER under the terms of this Agreement, CITY shall provide a copy of that notice to the Mortgagee within ten (10) days of sending the notice of default to OWNER. The Mortgagee shall have the right, but not the obligation, to cure the default during the remaining cure period allowed such party under this Agreement. (d) Any Mortgagee who comes into possession of the Property, or any part thereof, pursuant to foreclosure of the mortgage or deed of trust, or deed in lieu of such foreclosure, shall take the Property, or part thereof, subject to the terms of this Agreement. Notwithstanding any other provision of this Agreement to the contrary, no Mortgagee shall have an obligation or duty under this Agreement to perform any of OWNER’s obligations or other affirmative covenants of OWNER hereunder, or to guarantee such performance; provided, however, that to the extent that any covenant to be performed by OWNER is a condition precedent to the performance of a covenant by CITY, the performance thereof shall continue to be a condition precedent to CITY’s performance hereunder, and further provided that any sale, transfer or assignment by any Mortgagee in possession shall be subject to the provisions of Section 2.4 of this Agreement.
11. MISCELLANEOUS PROVISIONS.
11.1 Recordation of Agreement. This Agreement and any amendment or cancellation thereof shall be recorded with the San Bernardino County Recorder by the City Clerk within the ten (10) days after the CITY executes this Agreement, as required by Section 65868.5 of the Government Code. If the parties to this Agreement or their successors in interest amend or cancel this Agreement as provided for herein and in Government Code Section 65868, or if the CITY terminates or modifies the agreement as provided for herein and in Government Code Section 65865.1 for failure of the applicant to comply in good faith with the terms or conditions of this Agreement, the City Clerk shall have notice of such action recorded with the San Bernardino County Recorder.
11.2 Entire Agreement. This Agreement sets forth and contains the entire understanding and agreement of the parties, and there are no oral or written representations, understandings or ancillary covenants, undertakings or agreements which are not contained or expressly referred to herein. No testimony or evidence of any such representations, understandings or covenants shall be admissible in any proceeding of any kind or nature to interpret or determine the terms or conditions of this Agreement.
11.3 Severability. If any term, provision, covenant or condition of this Agreement shall be determined invalid, void or unenforceable, the remainder of this Agreement shall not be affected thereby to the extent such remaining provisions are not rendered impractical to perform taking into consideration the purposes of this Agreement. Notwithstanding the foregoing, the provision of the Public Benefits set forth in Section 4 of this Agreement, including the payment of the fees set forth therein, are essential elements of this Agreement and CITY would not have entered into this 663
-33-
Agreement but for such provisions, and therefore in the event such provisions are determined to be invalid, void or unenforceable, this entire Agreement shall be null and void and of no force and effect whatsoever.
11.4 Interpretation and Governing Law. This Agreement and any dispute arising hereunder shall be governed and interpreted in accordance with the laws of the State of California. This Agreement shall be construed as a whole according to its fair language and common meaning to achieve the objectives and purposes of the parties hereto, and the rule of construction to the effect that ambiguities are to be resolved against the drafting party shall not be employed in interpreting this Agreement, all parties having been represented by counsel in the negotiation and preparation hereof.
11.5 Section Headings. All section headings and subheadings are inserted for convenience only and shall not affect any construction or interpretation of this Agreement.
11.6 Singular and Plural. As used herein, the singular of any word includes the plural.
11.7 Joint and Several Obligations. Subject to section 2.4, if at any time during the term of this Agreement the Property is owned, in whole or in part, by more than one owner, all obligations of such owners under this Agreement shall be joint and several, and the default of any such owner shall be the default of all such owners.
Notwithstanding the foregoing, no owner of a single lot which has been finally subdivided and sold to such owner as a member of the general public or otherwise as an ultimate user shall have any obligation under this Agreement except as provided under Section 4 hereof.
11.8 Time of Essence. Time is of the essence in the performance of the provisions of this Agreement as to which time is an element.
11.9 Waiver. Failure by a party to insist upon the strict performance of any of the provisions of this Agreement by the other party, or the failure by a party to exercise its rights upon the default of the other party, shall not constitute a waiver of such party’s right to insist and demand strict compliance by the other party with the terms of this Agreement thereafter.
11.10 No Third Party Beneficiaries. This Agreement is made and entered into for the sole protection and benefit of the parties and their successors and assigns. No other person shall have any right of action based upon any provision of this Agreement.
11.11 Force Majeure. Neither party shall be deemed to be in default where failure or delay in performance of any of its obligations under this Agreement is caused by floods, earthquakes, other Acts of God, fires, wars, riots or similar hostilities, strikes and other labor difficulties beyond the party’s control, (including the party’s employment force), government regulations, court actions (such as restraining orders or injunctions), or other causes beyond the party’s control. If any such events shall occur, the term of this Agreement and the time for performance by either party of any of its obligations 664
-34-
hereunder may be extended by the written agreement of the parties for the period of time that such events prevented such performance, provided that the term of this Agreement shall not be extended under any circumstances for more than five (5) years.
11.12 Mutual Covenants. The covenants contained herein are mutual covenants and also constitute conditions to the concurrent or subsequent performance by the party benefited thereby of the covenants to be performed hereunder by such benefited party.
11.13 Successors in Interest. The burdens of this Agreement shall be binding upon, and the benefits of this Agreement shall inure to, all successors in interest to the parties to this Agreement. All provisions of this Agreement shall be enforceable as equitable servitudes and constitute covenants running with the land. Each covenant to do or refrain from doing some act hereunder with regard to development of the Property: (a) is for the benefit of and is a burden upon every portion of the Property; (b) runs with the Property and each portion thereof; and, (c) is binding upon each party and each successor in interest during ownership of the Property or any portion thereof.
11.14 Counterparts. This Agreement may be executed by the parties in counterparts, which counterparts shall be construed together and have the same effect as if all of the parties had executed the same instrument.
11.15 Jurisdiction and Venue. Any action at law or in equity arising under this Agreement or brought by a party hereto for the purpose of enforcing, construing or determining the validity of any provision of this Agreement shall be filed and tried in the Superior Court of the County of San Bernardino, State of California, and the parties hereto waive all provisions of law providing for the filing, removal or change of venue to any other court.
11.16 Project as a Private Undertaking. It is specifically understood and agreed by and between the parties hereto that the development of the Project is a private development, that neither party is acting as the agent of the other in any respect hereunder, and that each party is an independent contracting entity with respect to the terms, covenants and conditions contained in this Agreement. No partnership, joint venture or other association of any kind is formed by this Agreement. The only relationship between CITY and OWNER is that of a government entity regulating the development of private property and the owner of such property.
11.17 Further Actions and Instruments. Each of the parties shall cooperate with and provide reasonable assistance to the other to the extent contemplated hereunder in the performance of all obligations under this Agreement and the satisfaction of the conditions of this Agreement. Upon the request of either party at any time, the other party shall promptly execute, with acknowledgment or affidavit if reasonably required, and file or record such required instruments and writings and take any actions as may be reasonably necessary under the terms of this Agreement to carry out the intent and to fulfill the provisions of this Agreement or to evidence or consummate the transactions contemplated by this Agreement. The City Manager may delegate his powers and 665
-35-
duties under this Agreement to an Assistant City Manager or other management level employee of the CITY.
11.18 Eminent Domain. No provision of this Agreement shall be construed to limit or restrict the exercise by CITY of its power of eminent domain.
11.19 Agent for Service of Process. In the event OWNER is not a resident of the State of California or it is an association, partnership or joint venture without a member, partner or joint venturer resident of the State of California, or it is a foreign corporation, then in any such event, OWNER shall file with the Planning Director, upon its execution of this Agreement, a designation of a natural person residing in the State of California, giving his or her name, residence and business addresses, as its agent for the purpose of service of process in any court action arising out of or based upon this Agreement, and the delivery to such agent of a copy of any process in any such action shall constitute valid service upon OWNER. If for any reason service of such process upon such agent is not feasible, then in such event OWNER may be personally served with such process out of this County and such service shall constitute valid service upon OWNER. OWNER is amenable to the process so served, submits to the jurisdiction of the Court so obtained and waives any and all objections and protests thereto. OWNER for itself, assigns and successors hereby waives the provisions of the Hague Convention (Convention on the Service Abroad of Judicial and Extra Judicial Documents in Civil or Commercial Matters, 20 U.S.T. 361, T.I.A.S. No. 6638).
11.20 Estoppel Certificate. Within thirty (30) business days following a written request by any of the parties, the other party shall execute and deliver to the requesting party a statement certifying that (i) either this Agreement is unmodified and in full force and effect or there have been specified (date and nature) modifications to the Agreement, but it remains in full force and effect as modified; and (ii) either there are no known current uncured defaults under this Agreement or that the responding party alleges that specified (date and nature) defaults exist. The statement shall also provide any other reasonable information requested. The failure to timely deliver this statement shall constitute a conclusive presumption that this Agreement is in full force and effect without modification except as may be represented by the requesting party and that there are no uncured defaults in the performance of the requesting party, except as may be represented by the requesting party. OWNER shall pay to CITY all costs incurred by CITY in connection with the issuance of estoppel certificates under this Section 11.20 prior to CITY’s issuance of such certificates.
11.21 Authority to Execute. The person or persons executing this Agreement on behalf of OWNER warrants and represents that he or she/they have the authority to execute this Agreement on behalf of his or her/their corporation, partnership or business entity and warrants and represents that he or she/they has/have the authority to bind OWNER to the performance of its obligations hereunder.
11.22 Prevailing Wage. OWNER, for itself, its successors, and assigns, agrees, covenants, and warrants that the development of the Property, if any, shall comply with all applicable federal and state labor laws (including, without limitation, the requirement 666
-36-
under California law to pay prevailing wages and hire apprentices), and all obligations as set forth herein.
11.22.1 CITY makes no representations concerning prevailing wages in compliance with California Labor Code Section 1770 et seq.
11.22.2 OWNER acknowledges and agrees that it shall be independently responsible for reviewing the applicable laws and regulations with respect to the payment of prevailing wages and complying therewith. OWNER shall bear all risks of payment or non-payment of prevailing wages under California law and/or the implementation of Labor Code Section 1781, as the same may be amended from time to time, and/or any other similar law.
11.22.3 The foregoing indemnity shall survive termination of this Agreement and shall continue after completion of the construction and development of the Property by OWNER, its successors or assigns. OWNER shall be solely responsible for determining and effectuating compliance with such laws.
11.22.4 OWNER, ON BEHALF OF ITSELF, ITS SUCCESSORS, AND
ASSIGNS, WAIVES AND RELEASES CITY FROM ANY RIGHT OF ACTION THAT MAY BE AVAILABLE TO OWNER PURSUANT TO LABOR CODE SECTION 1781 OR THE DAVIS BACON ACT. RELATIVE TO THE WAIVER AND RELEASE CONTAINED IN THIS SECTION 11.22, OWNER ACKNOWLEDGES THE PROTECTIONS OF CIVIL CODE SECTION 1542, WHICH READS AS FOLLOWS: A GENERAL RELEASE DOES
NOT EXTEND TO CLAIMS THAT THE CREDITOR OR RELEASING PARTY DOES
NOT KNOW OR SUSPECT TO EXIST IN HIS OR HER FAVOR AT THE TIME OF
EXECUTING THE RELEASE, WHICH IF KNOWN BY HIM OR HER MUST HAVE
MATERIALLY AFFECTED HIS OR HER SETTLEMENT WITH THE DEBTOR OR RELEASED PARTY.
INITIALS. BY INITIALING BELOW, OWNER KNOWINGLY AND
VOLUNTARILY WAIVES THE PROVISIONS OF SECTION 1542 SOLELY WITH THE
MATTERS WHICH ARE THE SUBJECT OF THE FOREGOING WAIVERS AND RELEASES:
_______________
(Owner's Initials)
IN WITNESS WHEREOF, the parties hereto have executed this Agreement on the day and year set forth below.
667
-37-
[SIGNATURES CONTAINED ON FOLLOWING PAGE]
668
-38-
SIGNATURE PAGE
TO DEVELOPMENT AGREEMENT PDA25-003
"OWNER"
GDC Investments 13,
a Limited Partnership____________
By: ________________________
Name: Dave Waters
Its:VicePresident____________________
Date: ___________________
"CITY"
CITY OF ONTARIO
By:
Scott Ochoa
City Manager
Date: ___________________
ATTEST:
City Clerk, Ontario
APPROVED AS TO FORM:
BEST BEST KRIEGER, LLP
City Attorney
669
ACKNOWLEDGEMENT
STATE OF CALIFORNIA )
COUNTY OF____________________ )
On _________________, 20_____, before me,______________________________________, Date Insert Name and Title of the Officer
personally appeared ___________________________________________________________ Name(s) of Signer(s)
____________________________________________________________________________, who proved to me on the basis of satisfactory evidence to be the person whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity, and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.
WITNESS my hand and official seal.
Signature________________________________
Signature of Notary Public
Place Notary Seal Above
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. 670
ACKNOWLEDGEMENT
STATE OF CALIFORNIA )
COUNTY OF____________________ )
On _________________, 20_____, before me__________________________________, Date Insert Name and Title of the Officer
personally appeared ________________________________________________________ Name(s) of Signer(s)
________________________________________________________________________, who proved to me on the basis of satisfactory evidence to be the person whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity, and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.
WITNESS my hand and official seal.
Signature________________________________
Signature of Notary Public
Place Notary Seal Above
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. 671
EXHIBIT "A"
TO DEVELOPMENT AGREEMENT
Legal Description of Property
THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE CITY OF
ONTARIO, COUNTY OF SAN BERNARDINO, STATE OF CALIFORNIA, AND IS DESCRIBED AS FOLLOWS:
LOT 1 OF TRACT NO. 18380, IN THE CITY OF ONTARIO, COUNTY OF SAN BERNARDINO, AS PER MAP RECORDED IN BOOK 350, PAGES 64 THROUGH 69,
INCLUSIVE OF MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY.
APN: 1073-101-05-0-000
672
EXHIBIT "B"
TO DEVELOPMENT AGREEMENT
Map showing Property and its location
673
EXHIBIT "C"
TO DEVELOPMENT AGREEMENT
Existing Development Approvals
On December 18, 2006, the Planning Commission:
a) Issued Resolution No. PC06-170 recommending City Council adopt and certify the Esperanza Environmental Impact Report (SCH#2002061047). b) Issued Resolution No. PC06-171 recommending City Council approval of the Esperanza Specific Plan (File No. PSP05-002).
On January 16, 2007, the City Council:
a) Adopted and certified the Esperanza Environmental Impact Report (SCH#2002061047) and issued Resolution No. 2007- 008.
On February 6, 2007, the City Council:
a) Approved the Esperanza Specific Plan (File No. PSP05-002) and adopted Ordinance No. 2852.
On August 27, 2019, the Planning Commission:
a) Issued Resolution No. PC19-064 for the approval of Tentative Tract Map 20157 (File No. PMTT18-002).
b) Issued Resolution No. PC19-068 recommending City Council approval of the Development Agreement (File No. PDA19-002).
674
EXHIBIT "D"
TO DEVELOPMENT AGREEMENT
Existing Land Use Regulations
These documents are listed for reference only:
1. Esperanza Specific Plan EIR (SCH#2002061047), Resolution No. 2007-008
2. Esperanza Specific Plan (File No. PSP0S-002), Ordinance No. 2852
3. City of Ontario Municipal Code
a. Six - Sanitation & Health
b. Seven - Public Works
c. Eight- Building Regulations
d. Nine - Development Code
e. Ten - Parks & Recreation
675
EXHBIT “E”
TO DEVELOPMENT AGREEMENT
Description of Required Infrastructure Improvements
OWNER shall design, construct, and complete all improvements including but not limited to Sewer (SW), Potable Water (PW), Recycled Water (RW), Storm Drain (SD), Fiber Optic (FO), and Street (ST) improvements necessary to serve the Property, prior to the request of any Production Units.
FIBER OPTICS (FO)
a) FO improvements on Chatham Street from South Amherst Avenue to Clifton Avenue.
POTABLE WATER (PW)
a) PW improvements on Clifton Avenue from Eucalyptus Avenue to Chatham Street.
b) PW improvements on Chatham Street from Clifton Avenue to Amherst Avenue. c) PW improvements on Amherst Avenue from Chatham Street to Eucalyptus Avenue.
RECYCLED WATER (RW)
a) RW improvements on Clifton Avenue from Eucalyptus Avenue to Chatham Street.
b) Abandonment of RW improvements on Amherst Avenue from Eucalyptus Avenue to Shelburne Street.
SEWER (SW)
a) SW improvements on Amherst Avenue from the Project’s point of connection to Eucalyptus Avenue.
676
EXHBIT “F”
TO DEVELOPMENT AGREEMENT
Required Infrastructure Improvements
(SEE ATTACHED EXHIBITS)
677
678
EXHIBIT “G”
TO DEVELOPMENT AGREEMENT
Form of Plume Disclosure Letter
679
Department: Planning
Prepared By: Robert Morales
Staff Member Presenting: Rudy Zeledon,
Executive Director Community Development
Approved By:
Submitted To: Council/OHA
Approved: _______________________________
Continued To: ___________________________
Denied: __________________________________
Item No: 13
SUBJECT: A PUBLIC HEARING TO CONSIDER AN ADDENDUM TO THE ONTARIO PLAN 2050
SUPPLEMENTAL ENVIRONMENTAL IMPACT REPORT FOR A GENERAL PLAN AMENDMENT (FILE NO. PGPA24-003) AND SPECIFIC PLAN AMENDMENT (FILE NO. PSPA24-004) TO THE ESPERANZA SPECIFIC PLAN
CITY OF ONTARIO
Agenda Report
November 4, 2025
SECTION:
PUBLIC HEARINGS
RECOMMENDATION:
That the City Council consider and adopt the following:
1. A Resolution approving an Addendum to The Ontario Plan 2050 Supplemental Environmental Impact Report (State Clearinghouse No. 2021070364, certified by the City Council on August 16, 2022); and
2. Resolutions approving General Plan Amendment (File No. PGPA24-003) and Specific Plan Amendment (File No. PSPA24-004)
THE FOLLOWING COUNCIL GOALS ARE BEING ACHIEVED:
Operate in a Businesslike Manner
Focus Resources in Ontario's Commercial and Residential Neighborhoods Invest in the City's Infrastructure (Water, Streets, Sewers, Parks, Storm Drains and Public Facilities)
Ensure the Development of a Well Planned, Balanced, and Self-Sustaining Community in Ontario Ranch
FISCAL IMPACT: There is not a direct fiscal impact associated with this action. The proposed General Plan Amendment and Specific Plan Amendment to the Esperanza Specific Plan would update land use designations and development standards to facilitate future residential development. Implementation of the amendments would generate increased property tax revenues from future housing and result in one-time payments to the City for plan check, permit, and development impact fees.
BACKGROUND & ANALYSIS: On January 27, 2010, the Ontario City Council certified The Ontario Plan Environmental Impact Report in conjunction with File No. PGPA06-001 (City Council Resolution No. 2010-006), and on August 16, 2022, the Ontario City Council certified The Ontario Plan 2050 680
Update Supplemental Environmental Impact Report (SEIR) in conjunction with The Ontario Plan 2050 Update (TOP 2050; File No. PGPA20-002). TOP 2050 and the associated SEIR analyzed the Project site and established guidelines for development, including, but not limited to, Public School (K-12) and university use. Within the SEIR, adjacent areas are designated for Low-Density Residential and Medium-Density Residential uses.
On May 25, 2023, the Mountain View School District officially informed GDC Communities, the property owner, that it would not exercise its option to purchase the Project site for an elementary school facility. Although the site had previously been identified as suitable for a Public School (K-12) use, the District determined that it no longer intends to pursue acquisition or development of the site (See Attachment A – Mountain View School District Letter).
On August 13, 2024, the applicant submitted applications for the following: (1) a General Plan Amendment (File No. PGPA24-003) to change the land use designation of approximately 10.02 acres from Public School to Medium Density Residential; (2) a Specific Plan Amendment (File No. PSPA24- 004) to revise the Esperanza Specific Plan to allow RD-7 (Row Townhomes) within Planning Area 11 and to update the plan’s land use map, standards, and exhibits accordingly; (3) a Tentative Tract Map (File No. PMTT24-008 / TTM 20730) to subdivide the 10.02 acres into 28 numbered lots and 15 lettered lots for condominium purposes; and (4) a Development Plan (File No. PDEV24-017) to construct 161 multiple-family dwellings within Planning Area 11 of the Esperanza Specific Plan.
On September 15, 2025, the Development Advisory Board conducted a public hearing regarding the Tentative Tract Map and Development Plan and recommended that the Planning Commission approve File Nos. PMTT24-008 and PDEV24-017.
On September 23, 2025, the Planning Commission conducted a public hearing regarding the General Plan Amendment (File No. PGPA24-003) and Specific Plan Amendment (File No. PSPA24- 004) and recommended that the City Council approve the applications by a 5-1 vote. The Commission also approved Tentative Tract Map (File No. PMTT24-008) and Development Plan (File No. PDEV24-017) by a 5-1 vote.
GENERAL PLAN AMENDMENT (File No. PGPA24-003): The Project proposes to amend the Ontario Plan Policy Plan Land Use Map and associated buildout tables to change the designation of 10.02 acres from Public School to Medium Density Residential. The Project site is currently designated Public School in the TOP 2050 Land Use Map. The proposed amendment would establish a Medium Density Residential designation with a buildout capacity of 224 dwelling units. This capacity offsets the 128-unit reduction from PGPA23-003 and ensures compliance with SB 330 by maintaining the City’s overall housing capacity.
SPECIFIC PLAN AMENDMENT (File No. PSPA24-004): The Specific Plan Amendment proposes the following changes:
Planning Area 11
Increase the number of units allowed from 0 to 161 dwelling units.
Revise the permitted land use from School to RD-7/Row Townhomes. 681
Other Revisions
Update the Specific Plan land use map (Planning Areas), development standards, exhibits, and text to reflect the proposed land use changes.
All changes to the Specific Plan, including exhibits, tables, development standards, and design guidelines, are included in the revised Specific Plan document accompanying this report. Additions are shown in red text, and deletions are indicated with strikethrough.
Approval of the related Tentative Tract Map and Development Plan files is contingent upon approval of the proposed General Plan Amendment, Specific Plan Amendment, and the related Addendum to The Ontario Plan 2050 Supplemental Environmental Impact Report (SCH No. 2021070364).
CORRESPONDENCE: The City received eleven letters opposing the proposed land use change. The main concerns raised were:
1. Loss of planned school site – Residents noted the site had been identified for a future school, and they felt the change to residential use conflicts with community expectations. Staff Response: The Mountain View School District formally declined to pursue the site for a school in May 2023. While the City acknowledges community concerns, school facility planning is outside the City's purview. The proposed medium-density residential use is compatible with the surrounding residential neighborhoods.
2. School capacity impacts – Residents expressed concern that new housing would worsen pressure on local schools, which are already strained by growth in Ontario Ranch. Staff Response: School capacity and facility planning fall under the responsibility of the School District, which manages needs through its own planning and enrollment forecasting. In March 2015, builders and property owners within the New Model Colony (NMC) entered into a Mitigation Agreement with the Mountain View School District (MVSD). This agreement provided funding for schools and identified several potential school sites that could be utilized as needed to serve the east Ontario Ranch area. The actual need for these sites is determined by student enrollment levels.
According to MVSD, current and projected enrollment figures are significantly below capacity, approximately 50% below. As a result, in May 2023, MVSD determined that the designated elementary school site within the Esperanza Specific Plan would not be required.
Even under the most conservative districtwide student generation projections, only three additional elementary school sites will be needed to meet demand at full buildout. Parkview Elementary School, located within the Parkplace community, is now open. New Haven Elementary School, located within the Avenue Specific Plan, is currently under construction and is scheduled to open in September 2027. Based on actual student generation rates to date, only two more elementary school sites will be required after New Haven Elementary is completed. Currently there are three more elementary school sites that are still reserved within the following Specific Plans: the Avenue, West Haven, and Great Park.
AIRPORT LAND USE COMPATIBILITY PLAN COMPLIANCE: The California State Aeronautics Act (Public Utilities Code Section 21670 et seq.) requires that an Airport Land Use Compatibility Plan be 682
prepared for all public use airports in the State and requires that local land use plans and individual development proposals must be consistent with the policies set forth in the adopted Airport Land Use Compatibility Plan.
On April 19, 2011, the City Council of the City of Ontario approved and adopted the ONT ALUCP, establishing the Airport Influence Area for Ontario International Airport, which encompasses lands within parts of San Bernardino, Riverside, and Los Angeles Counties, and limits future land uses and development within the Airport Influence Area, as they relate to noise, safety, airspace protection, and overflight impacts of current and future airport activity. As the decision-making body for PGPA24-003 and PSPA24-004, the City Council has reviewed and considered the facts and information contained in the Application and supporting documentation against the ONT ALUCP compatibility factors, including [1] Safety Criteria (ONT ALUCP Table 2-2) and Safety Zones (ONT ALUCP Map 2-2), [2] Noise Criteria (ONT ALUCP Table 2-3) and Noise Impact Zones (ONT ALUCP Map 2-3), [3] Airspace protection Zones (ONT ALUCP Map 2-4), and [4] Overflight Notification Zones (ONT ALUCP Map 2-5). As a result, the Planning Commission finds and determines that the Project, when implemented in conjunction with the conditions of approval, will be consistent with the policies and criteria set forth within the ONT ALUCP.
HOUSING ELEMENT COMPLIANCE: The Project is consistent with the Housing Element of the Policy Plan (general plan) component of The Ontario Plan 2050, as the Project site is not one of the properties in the Housing Element Sites contained in Tables B-1 and B-2 (Housing Element Sites Inventory) of the Housing Element Technical Report.
ENVIRONMENTAL REVIEW: The environmental impacts of the Project were reviewed in conjunction with The Ontario Plan 2050 Supplemental Environmental Impact Report (SCH No. 2021070364; certified by the City Council on August 16, 2022).
The Application is a project pursuant to the California Environmental Quality Act (Public Resources Code Section 21000, et seq.) (CEQA) and an Addendum has been prepared to determine possible environmental impacts. Although the proposed Project could have a significant effect on the environment, because all potentially significant effects have been analyzed adequately in an earlier Certified EIR and have been avoided or mitigated pursuant to that earlier Certified EIR, including revisions or mitigation measures that are imposed on the proposed Project, nothing further is required. The Project will introduce no new significant environmental impacts beyond those previously analyzed in the Certified EIR, and all mitigation measures previously adopted by the Environmental Impact Report, are a condition of project approval and are incorporated in the Addendum.
CONCLUSION: Staff recommends that the City Council adopt Resolutions approving General Plan Amendment (File No. PGPA24-003) and Specific Plan Amendment (File No. PSPA24-004). 683
FILE NOS: PGPA24-003, PSPA24-004, PMTT24-008, & PDEV24-017 SUBJECT: A public hearing to consider the following: [1] An Amendment (File No.
PGPA24-003) to The Ontario Plan 2050 Policy Plan (General Plan) Land Use Map to change the land use designation on approximately 10.02 acres of land, located south of Chatham Street, west of Clifton Avenue, east of Amherst Avenue, and north of Eucalyptus Avenue, from Public School to Medium Density Residential; [2] An Amendment (File No. PSPA24-004) to the Esperanza Specific Plan to revise the specific plan for consistency with The Ontario Plan Policy Plan (General Plan) Land Use Map. The amendment includes [i] revising the allowed uses within Planning Area 11 from School to RD-7/Row Townhomes; and [ii] modifying the Specific Plan land use map, development standards, exhibits, and text to reflect the proposed land use changes; [3] A Tentative Tract Map (TTM 20730) (File No. PMTT24-008) for condominium purposes to subdivide approximately 10.02 acres into 28 numbered lots and 15 lettered lots, located within Planning Area 11 (RD-7/Row Townhomes) of the Esperanza Specific Plan; and [4] A Development Plan (File No. PDEV24-017) to construct 161 multiple-family dwellings on approximately 10.02 acres, located within Planning Area 11 (RD-7/Row Townhomes) of the Esperanza Specific Plan. Submitted by GDC Investments 13, LP. City Council action is required for File Nos. PGPA24-003 and PSPA24-004.
PROPERTY OWNER: GDC Investments 13, LP
RECOMMENDED ACTION: That the Planning Commission consider and adopt the following:
1. A Resolution recommending the City Council approve the Addendum to The Ontario Plan 2050 Supplemental Environmental Impact Report (State Clearinghouse No. 2021070364, certified by the City Council on August 16, 2022); and
2. Resolutions recommending the City Council approve General Plan Amendment and Specific Plan Amendments (File Nos. PGPA24-003 and PSPA24-004) pursuant to the facts and reasons contained in the staff report and attached Resolutions; and
3. Resolutions approving Tentative Tract Map and Development Plan (File Nos.
PMTT24-008 and PDEV24-017), pursuant to the facts and reasons contained in the staff report and subject to the conditions of approval appended to the Resolutions as Attachment A.
303 East B Street, Ontario, California 91764 Phone: 909.395.2036 / Email: [email protected]
PLANNING COMMISSION
AGENDA REPORT
September 23, 2025
684
Planning Commission Agenda Report
File Nos. PGPA24-003, PSPA24-004, PMTT24-008, & PDEV24-017 September 23, 2025
BACKGROUND: On January 27, 2010, the Ontario City Council certified The Ontario Plan Environmental Impact Report in conjunction with File No. PGPA06-001 (City Council Resolution No. 2010-006), and on August 16, 2022, the Ontario City Council certified The Ontario Plan 2050 Update Supplemental Environmental Impact Report (SEIR) in conjunction with The Ontario Plan 2050 Update (TOP 2050; File No. PGPA20-002). TOP 2050 and the associated SEIR analyzed the Project site and established guidelines for development, including, but not limited to, Public School (K-12) and university uses. Within the SEIR, adjacent areas are designated for Low-Density Residential and Medium-Density Residential uses.
On May 25, 2023, the Mountain View School District officially informed GDC Communities, the property owner, that it would not exercise its option to purchase the Project site for an elementary school facility. Although the site had previously been identified as suitable for a Public School (K-12) use, the District determined that it no longer intends to pursue acquisition or development of the site (See Attachment A – Mountain View School District Letter).
On August 13, 2024, the applicant submitted applications for the following: (1) a General Plan Amendment (File No. PGPA24-003) to change the land use designation of approximately 10.02 acres from Public School to Medium Density Residential; (2) a Specific Plan Amendment (File No. PSPA24-004) to revise the Esperanza Specific Plan to allow RD-7 (Row Townhomes) within Planning Area 11 and to update the plan’s land use map, standards, and exhibits accordingly; (3) a Tentative Tract Map (File No. PMTT24-008 / TTM 20730) to subdivide the 10.02 acres into 28 numbered lots and 15 lettered lots for condominium purposes; and (4) a Development Plan (File No. PDEV24-017) to construct 161 multiple-family dwellings within Planning Area 11 of the Esperanza Specific Plan.
On September 15, 2025, the Development Advisory Board conducted a public hearing regarding the Tentative Tract Map and Development Plan and recommended that the Planning Commission approve File Nos. PMTT24-008 and PDEV24-017.
PROJECT SETTING: The Project site consists of approximately 10.02 acres located south of Chatham Street, west of Clifton Avenue, east of Amherst Avenue, and north of Eucalyptus Avenue, within Planning Area 11 of the Esperanza Specific Plan (see Exhibit A:
Project Location Map). The site is currently vacant and is surrounded by established residential neighborhoods, developed with low- and medium-density housing, consistent with the Esperanza Specific Plan. Surrounding land uses, zoning, and the applicable Policy Plan (General Plan) and Specific Plan designations are summarized in Table 1:
Surrounding Zoning & Land Uses.
PROJECT ANALYSIS:
(1) General Plan Amendment (File No. PGPA24-003)
685
Planning Commission Agenda Report
File Nos. PGPA24-003, PSPA24-004, PMTT24-008, & PDEV24-017 September 23, 2025
The Project would amend the Ontario Plan Policy Plan – Land Use Map and associated buildout tables to reflect the change in land use from School to Medium Density Residential (see Exhibit B). The proposed Project will establish the following:
• Convert 10.02 acres of land from Public School to Medium Density Residential.
The Project site is currently designated Public School in the TOP 2050 Land Use Map. The proposed General Plan Amendment would change the designation to Medium Density Residential, establishing a buildout capacity of 224 dwelling units. This capacity accommodates the 130-unit loss resulting from PGPA23-003 and ensures compliance with SB 330 by maintaining the City’s overall housing capacity. (2) Specific Plan Amendment (File No. PSPA24-004)
The SPA proposes the following changes:
Revise Planning Area 11 to include:
Increase the number of units allowed from 0 dwelling units to 161 dwelling units.
Revise the allowed uses from School to RD-7/Row Townhomes Various changes to the Specific Plan land use map (Planning Areas), development standards, exhibits, and text modification, to reflect the proposed land use changes.
All changes and additions to the Specific Plan (including exhibits, tables, development standards, and design guidelines) are shown in the revised Specific Plan document accompanying this report. Additions are highlighted in red text, while deletions are indicated with strikethroughs.
Approval of the related Tentative Tract Map and Development Plan, discussed below, is contingent upon the approval of the proposed General Plan Amendment, Specific Plan Amendment and related Addendum to The Ontario Plan 2050 Supplemental Environmental Impact Report (SCH No. 2021070364).
(3) Tentative Tract Map (File No. PMTT24-008)
Tentative Tract Map No. 20730 (File No. PMTT24-008) for Condominium Purposes proposes to subdivide 10.02 acres within Planning Area 11 of the Esperanza Specific Plan into 28 numbered lots for a total of 161 dwelling units and 15 lettered lots. The lettered lots are designated for public and private streets, landscape edges, and common open space.
The numbered lots range from 6,098 to 10,454 square feet, with an average lot size of 7,639 square feet. While the RD-7 (Row Townhome) designation under the Specific Plan does not require a minimum lot size, width, or depth, the configuration of the lots is determined by building setbacks and required separations. The proposed tract yields a net density of 16.07 dwelling units per acre, consistent with the Esperanza Specific Plan. 686
Planning Commission Agenda Report
File Nos. PGPA24-003, PSPA24-004, PMTT24-008, & PDEV24-017 September 23, 2025
(4) Development Plan (File No. PDEV24-017)
(a) Site Design/Building Layout — The Project consists of 161 attached row townhome units in 28 buildings, with 2- and 3-story configurations. Buildings are organized along a private street network with rear-loaded garages accessed from drive aisles that also serve as fire lanes. Buildings along Clifton Avenue, Amherst Avenue, and Eucalyptus Avenue include pedestrian entries, landscape improvements, and project monumentation. A multipurpose trail and six-foot community wall are proposed along Eucalyptus Avenue.
The site includes a recreation area with a pool and common open space, as well as distributed private courtyards. Each unit includes private open space in the form of porches, patios, or balconies. A total of approximately 96,000 square feet of open space is provided, exceeding Specific Plan requirements. Parking is provided through private two-car garages, driveway spaces, uncovered surface spaces, and parallel off-site spaces, meeting the required parking ratio.
(b) Site Access/Circulation — The Project site will have two primary vehicular access points, one from Amherst Avenue and one from Chatham Street. Both access points connect to a private street network designed with 24-foot-wide drive aisles that also function as fire lanes and provide access to individual garages, guest parking spaces, and parallel on-street parking. The circulation system is designed to accommodate emergency vehicle access and maintain connectivity throughout the site. Pedestrian access is provided through individual entries along the project’s street frontages, including Amherst Avenue, Clifton Avenue, and Eucalyptus Avenue. A multipurpose trail is planned along Eucalyptus Avenue, and internal pedestrian pathways provide connections between buildings, open space areas, and parking facilities. (c) Parking — The Project requires 414 vehicle parking spaces, as specified in the Esperanza Specific Plan. The project proposes a total of 433 spaces, which exceeds the minimum requirement. Parking is provided through 322 enclosed garage spaces, 45 uncovered surface spaces, 17 driveway spaces, and 49 parallel on-street spaces. The parking calculations for the project are summarized in Table 3: Parking Summary. (d) Architecture — The Applicant proposes two architectural styles: Transitional Farmhouse and Transitional Spanish. Both styles are applied to 2- and 3-story row townhome buildings.
Transitional Farmhouse — The row townhomes in a Transitional Farmhouse style include the following treatments:
o Simple gabled rooflines with composition shingles;
o Vertical board-and-batten siding combined with horizontal lap siding; o Light stucco walls with contrasting trim;
o Covered entries with porch elements; and
o Balconies and vertically proportioned windows for articulation. 687
Planning Commission Agenda Report
File Nos. PGPA24-003, PSPA24-004, PMTT24-008, & PDEV24-017 September 23, 2025
Transitional Spanish — The row townhomes in a Transitional Spanish style include the following treatments:
o Gabled and hipped roof forms with S-profile concrete roof tiles; o Smooth stucco finishes in light neutral tones;
o Arched entryways at selected units;
o Simple eave detailing with occasional shed roof projections; o Recessed windows with trim; and
o Metal balcony railings and light fixtures for articulation. (e) Landscaping — The Project incorporates California native and droughttolerant tree species, including Desert Museum Palo Verde, Western Redbud, Golden Rain Tree, Crape Myrtle, Chinese Pistache, California Sycamore, Coast Live Oak, Brisbane Box, and Olive. Palms are included in limited quantities for vertical emphasis along key frontages. A mix of evergreen and deciduous trees is distributed throughout private streets, courtyards, and open space areas to provide shade and buffering. (f) Open Space/Amenities — Private open space is provided through porches, patios, and balconies for each unit, totaling approximately 37,150 square feet, which exceeds the 24,150 square feet required. Common open space is provided in the form of a central recreation area with a pool, private courtyards, and landscaped paseos, totaling approximately 58,878 square feet, which exceeds the 40,250 square feet required. In total, 96,028 square feet of open space is provided, surpassing the minimum requirement of 64,400 square feet.
(g) Traffic — The Trip Generation Assessment compared traffic from the approved elementary school in the Esperanza Specific Plan with the proposed 161-unit residential project. The school was estimated to generate 949 daily trips, including 309 in the AM peak and 206 in the PM peak. The proposed residences are expected to generate 944 daily trips, with 108 AM and 125 PM peak trips. This represents a net reduction of 5 daily trips, 201 fewer AM peak trips, and 81 fewer PM peak trips compared to the school use. Because the Project results in fewer trips than previously approved, no additional traffic operations analysis is required.
Traffic Comparison: School vs. Residential
Use Daily Trips AM Peak Trips PM Peak Trips
Approved Elementary School 949 309 206
Proposed 161 Homes 944 108 125
Difference (School – Homes) -5 -201 -81
(h) Signage — All Project signage is required to comply with sign regulations provided in Ontario Development Code Division 8.1 and the Esperanza Specific Plan.
Prior to the issuance of a Building Permit for the installation of any new on-site signage, the Applicant is required to submit Sign Plans for Planning Department review and approval.
688
Planning Commission Agenda Report
File Nos. PGPA24-003, PSPA24-004, PMTT24-008, & PDEV24-017 September 23, 2025
(i) Utilities (drainage, sewer) — Public utilities (water and sewer) are available to serve the Project. Furthermore, the Applicant has submitted a Preliminary Water Quality Management Plan (PWQMP), which establishes the Project's compliance with storm water discharge/water quality requirements. The PWQMP includes site design measures that capture runoff and pollutant transport by minimizing impervious surfaces and maximizes low impact development (LID) best management practices (BMPs), such as retention and infiltration, biotreatment, and evapotranspiration. The PWQMP proposes the use of private storm drain. Any overflow drainage will be conveyed to the public street by way of parkway drains and culverts.
PUBLIC NOTIFICATION: The subject application was advertised as a public hearing in at least one newspaper of general circulation in the City of Ontario (the Inland Valley Daily Bulletin newspaper). In addition, the Project site was posted with one or more large public notification signs and notices were mailed to all owners of real property located within a minimum of 300 feet of the exterior boundaries of the property that is the subject of the hearing, as shown on the records of the County Assessor.
CORRESPONDENCE: As of the preparation of this report, the City has received 8 written letters of opposition to the proposed land use change. The letters raise the following common concerns (See Attachment B – Opposition Letters):
1. The project site was previously identified for a future school use. Residents expressed concern that changing the land use would not align with the community’s expectations for a school facility.
Staff Response: The Mountain View School District (School District) formally notified the property owner on May 25, 2023 (see Attachment A), that it no longer intends to acquire or develop the site for a school facility. The City acknowledges the residents concern of the change of land use from a school facility to medium density residential. Unfortunately, the City does not have control of the School District facilities planning. The proposed land use amendment from a school facility to medium density residential is complementary because the project site is surrounded by singlefamily and multi-family residential uses and the proposed medium density residential land use would be consistent with these existing residential neighborhoods.
2. Recent residential growth in Ontario Ranch has already increased the need for additional school facilities and converting the project site to housing may add further strain to existing schools.
Staff Response: School facility planning is the responsibility of the School District, which addresses demand through their own separate facilities planning and enrollment forecast analysis processes.
AGENCY/DEPARTMENT REVIEWS: Each City agency/department has been provided the opportunity to review and comment on the subject application and recommend conditions of approval to be imposed upon the application. At the time of the Resolution 689
Planning Commission Agenda Report
File Nos. PGPA24-003, PSPA24-004, PMTT24-008, & PDEV24-017 September 23, 2025
preparation, recommended conditions of approval were provided and are appended to the attached Resolutions as Attachment A.
AIRPORT LAND USE COMPATIBILITY PLAN (ALUCP) COMPLIANCE: The California State Aeronautics Act (Public Utilities Code Section 21670 et seq.) requires that an Airport Land Use Compatibility Plan be prepared for all public use airports in the State; and requires that local land use plans and individual development proposals must be consistent with the policies set forth in the adopted Airport Land Use Compatibility Plan.
On April 19, 2011, the City Council of the City of Ontario approved and adopted the ONT ALUCP, establishing the Airport Influence Area for Ontario International Airport, which encompasses lands within parts of San Bernardino, Riverside, and Los Angeles Counties, and limits future land uses and development within the Airport Influence Area, as they relate to noise, safety, airspace protection, and overflight impacts of current and future airport activity. As the decision-making body for PMTT24-008 and PDEV24-017, and the recommending body for PGPA24-003 and PSPA24-004, the Planning Commission has reviewed and considered the facts and information contained in the Application and supporting documentation against the ONT ALUCP compatibility factors, including [1] Safety Criteria (ONT ALUCP Table 2-2) and Safety Zones (ONT ALUCP Map 2-2), [2] Noise Criteria (ONT ALUCP Table 2-3) and Noise Impact Zones (ONT ALUCP Map 2-3), [3] Airspace protection Zones (ONT ALUCP Map 2-4), and [4] Overflight Notification Zones (ONT ALUCP Map 2-5). As a result, the Planning Commission finds and determines that the Project, when implemented in conjunction with the conditions of approval, will be consistent with the policies and criteria set forth within the ONT ALUCP.
COMPLIANCE WITH THE ONTARIO PLAN 2050: The proposed Project is consistent with the principles, goals and policies contained within the Vision, Governance, Policy Plan (general plan), and City Council Priorities components of The Ontario Plan 2050 (TOP).
More specifically, the goals and policies of TOP that are furthered by the proposed Project are as follows:
(1) City Council Goals.
• Operate in a Businesslike Manner
• Focus Resources in Ontario’s Commercial and Residential Neighborhoods • Invest in the City’s Infrastructure (Water, Streets, Sewers, Parks, Storm Drains and Public Facilities)
• Ensure the Development of a Well Planned, Balanced, and Self-Sustaining Community in Ontario Ranch
(2) Vision.
Distinctive Development that integrates our varied and diverse focal points, districts, centers, corridors, and neighborhoods to provide a feeling of coherence without sacrificing uniqueness.
690
Planning Commission Agenda Report
File Nos. PGPA24-003, PSPA24-004, PMTT24-008, & PDEV24-017 September 23, 2025
Commercial and Residential Development
• Development quality that is broadly recognized as distinctive and not exclusively tied to the general suburban character typical of much of Southern California.
• A demonstrated ability to attract housing in pursuit of our acknowledged responsibility to balance housing with the job growth that drives our quality of life.
• Distinctive and well-maintained neighborhoods that offer exceptional variety in lifestyles, with convenient access to schools, recreation and cultural facilities, places of worship, places of employment and shopping.
Development Quality
• Unique and authentic districts, centers, and corridors of varied scales that establish Ontario as one of the most vital and diverse locales in Southern California.
• Superior quality and design of the built environment and open spaces through careful attention to detail at every scale, including public and private spaces and structures.
(3) Governance.
Decision Making
Goal G1: Sustained decision-making that consistently moves Ontario towards its Vision by using The Ontario Plan as a framework for assessing choices. • G1-1 Consistency with Policies. We require that staff recommendations to the City Council be consistent with adopted City Council Priorities (Goals and Objectives) and The Policy Pan.
• G1-2 Long-term Benefit. We require decisions to demonstrate and document how they add value to the community and support the Ontario Vision.
(4) Policy Plan (General Plan).
Land Use Element
Goal LU-1 Balance: A community that has a spectrum of housing types and price ranges that match the jobs in the City and that make it possible for people to live and work in Ontario and maintain a quality of life.
691
Planning Commission Agenda Report
File Nos. PGPA24-003, PSPA24-004, PMTT24-008, & PDEV24-017 September 23, 2025
• LU-1.1 Strategic Growth. We concentrate growth in strategic locations that help create place and identity, maximize available and planned infrastructure, foster the development of transit, and support the expansion of the active and multimodal transportation networks throughout the City. • LU-1.6 Complete Community. We incorporate a variety of land uses and building types in our land use planning efforts that result in a complete community where residents at all stages of life, employers, workers, and visitors have a wide spectrum of choices of where they can live, work, shop and recreate within Ontario.
Housing Element
Goal H-1 Neighborhoods & Housing: Stable neighborhoods of quality housing, ample community services, and public facilities, well-maintained infrastructure, and public safety that foster a positive sense of identity.
• H-1.2 Neighborhood Conditions. We direct efforts to improve the long-term sustainability of neighborhoods through comprehensive planning, provision of neighborhood amenities, rehabilitation and maintenance of housing, and community building efforts.
• H-1.5 Neighborhood Identity. We strengthen neighborhood identity through creating parks and recreational outlets, sponsoring neighborhood events, and encouraging resident participation in the planning and improvement of their neighborhoods.
Goal H-2 Housing Supply & Diversity: Diversity of types of quality housing that are affordable to a range of household income levels, accommodate changing demographics, and support and reinforce the economic sustainability of Ontario. • H-2.4 Ontario Ranch. We support a premier lifestyle community in the Ontario Ranch, distinguished by diverse housing, highest design quality, and cohesive and highly amenitized neighborhoods.
• H-2.5 Housing Design. We require architectural excellence through adherence to City design guidelines, thoughtful site planning, environmentally sustainable practices, and other best practices.
Community Economics Element
Goal CE-1 Complete Community: A complete community that provides for all incomes and stages of life.
692
Planning Commission Agenda Report
File Nos. PGPA24-003, PSPA24-004, PMTT24-008, & PDEV24-017 September 23, 2025
• CE-1.1 Jobs-Housing Balance. We pursue improvement to the Inland Empire’s balance between jobs and housing by promoting job growth that reduces the regional economy’s reliance on out-commuting. • CE-1.6 Diversity of Housing. We collaborate with residents, housing providers, and the development community to provide housing opportunities for every stage of life; we plan for a variety of housing types and price points to encourage the development of housing supportive of our efforts to attract business in growing sectors of the community while being respectful of existing viable uses.
Goal CE-2 Placemaking: A City of distinctive neighborhoods, districts, corridors, and centers where people choose to be.
• CE-2.1 Development Projects. We require new development and redevelopment to create unique, high-quality places that add value to the community.
• CE-2.2 Development Review. We require those proposing new development and redevelopment to demonstrate how their projects will create appropriately unique, functional, and sustainable places that will compete well with their competition within the region.
• CE-2.4 Protection of Investment. We require that new development and redevelopment protect existing investment by providing architecture and urban design of equal or greater quality.
• CE-2.5 Private Maintenance. We require adequate maintenance, upkeep, and investment in private property because proper maintenance on private property protects property values.
Mobility Element
Goal M-1 Roadway System: A system of roadways that meets the mobility needs of a dynamic and prosperous Ontario.
• M-1.4 Complete Streets. We work to provide a complete, balanced, context-aware, multimodal transportation network that meets the needs of all users of streets, roads, and highways, including motorists, pedestrians, bicyclists, children, persons with disabilities, seniors, movers of commercial goods, and users of public transportation. We prioritize implementation of complete streets improvements in environmental justice areas to facilitate opportunities for residents to use active transportation systems.
Goal M-2 Active Transportation: A system of trails and corridors that facilitate and encourage active modes of transportation.
693
Planning Commission Agenda Report
File Nos. PGPA24-003, PSPA24-004, PMTT24-008, & PDEV24-017 September 23, 2025
• M-2.3 Pedestrian Walkways. We require streets to include sidewalks and visible crosswalks at major intersections where necessary to promote safe and comfortable mobility between residential areas, businesses, schools, parks, recreation areas, and other key destination points.
Community Design Element
Goal CD-1 Image & Identity: A dynamic, progressive city containing distinct and complete places that foster a positive sense of identity and belonging among residents, visitors, and businesses.
Goal CD-2 Design Quality: A high level of design quality resulting in neighborhoods, public spaces, parks, and streetscapes that are attractive, safe, functional, human-scale, and distinct.
• CD-2.1 Quality Building Design and Architecture. We encourage all development projects to convey visual interest and character through:
1. Building volume, massing, and height to provide contextappropriate scale and proportion;
2. A true architectural style which is carried out in plan, section, and elevation through all aspects of the building and site design and appropriate for its setting; and
3. Exterior building materials that are articulated, high quality, durable, and appropriate for the architectural style.
• CD-2.2 Neighborhood Design. We create distinct residential neighborhoods that promote a sense of community and identity by emphasizing access, connectivity, livability, and social interaction through such elements as:
1. A pattern of smaller, walkable blocks that promote activity, safety, and access to nearby amenities and services;
2. Varied parcel sizes and lot configurations to accommodate a diversity of housing types;
3. Traffic calming measures to slow traffic and promote walkability while maintaining acceptable traffic flows and emergency evacuation access;
4. Floor plans that encourage views onto the street and de-emphasize the visual and physical dominance of garages (introducing the front porch as the “outdoor living room”), as appropriate; and 694
Planning Commission Agenda Report
File Nos. PGPA24-003, PSPA24-004, PMTT24-008, & PDEV24-017 September 23, 2025
5. Landscaped parkways, with sidewalks separated from the curb and designed to maximize safety, comfort, and aesthetics for all users. • CD-2.9 Landscape Design. We encourage durable, sustainable, and drought-tolerant landscaping materials and designs that enhance the aesthetics of structures, create and define public and private spaces, and provide shade and environmental benefits.
• CD-2.10 Parking Areas. We require all development, including single-family residential, to minimize the visual impact of surface, structured, and garage parking areas visible from the public realm in an aesthetically pleasing, safe and environmentally sensitive manner. Examples include:
1. Garage parking: providing access to single-family residential garages through alley access, recessing garages from the frontage to emphasize front doors or active living spaces.
• CD-2.13 Entitlement Process. We work collaboratively with all stakeholders to ensure a high degree of certainty in the efficient review and timely processing of all development plans and permits.
HOUSING ELEMENT COMPLIANCE: The Project is consistent with the Housing Element of the Policy Plan (general plan) component of The Ontario Plan 2050, as the Project site is not one of the properties in the Housing Element Sites contained in Tables B-1 and B-2 (Housing Element Sites Inventory) of the Housing Element Technical Report.
ENVIRONMENTAL REVIEW: The environmental impacts of the Project were reviewed in conjunction with The Ontario Plan 2050 Supplemental Environmental Impact Report (SCH No. 2021070364; certified by the City Council on August 16, 2022).
The Application is a project pursuant to the California Environmental Quality Act (Public Resources Code Section 21000, et seq.) (CEQA) and an Addendum has been prepared to determine possible environmental impacts. Although the proposed Project could have a significant effect on the environment, because all potentially significant effects have been analyzed adequately in an earlier Certified EIR and have been avoided or mitigated pursuant to that earlier Certified EIR, including revisions or mitigation measures that are imposed on the proposed Project, nothing further is required. The Project will introduce no new significant environmental impacts beyond those previously analyzed in the Certified EIR, and all mitigation measures previously adopted by the Environmental Impact Report, are a condition of project approval and are incorporated in the Addendum.
The Addendum prepared for the Project included studies and assessments (see Appendices C through M, Attachment A – TOP SEIR Addendum). A summary of each study is as follows:
695
Planning Commission Agenda Report
File Nos. PGPA24-003, PSPA24-004, PMTT24-008, & PDEV24-017 September 23, 2025
(a) Air Quality — The Air Quality Assessment evaluated construction and operational emissions for the Project. Modeling showed that emissions would not exceed the South Coast Air Quality Management District thresholds. The study concluded that air quality impacts would be less than significant, and no additional mitigation is required beyond compliance with existing State and regional regulations. (b) Cultural Resources Report — The Cultural Resources Report evaluated archaeological and historic resources within the project site. A records search, Sacred Lands File review, and field survey found no cultural resources on-site. Due to prior grading and lack of findings, no impacts are anticipated and no further study or mitigation is recommended.
(c) Geotechnical Investigation — The Geotechnical Evaluation reviewed soil and subsurface conditions for the Project site. Testing confirmed that the site consists of engineered fill over dense alluvial soils, with groundwater more than 120 feet below ground. The site is not within an active fault zone, and the potential for liquefaction or lateral spreading is very low. With standard grading and foundation practices, the study concluded that the site is suitable for development and no significant geotechnical constraints are expected.
(d) Paleontological Resources Assessment — The Paleontological Resources Assessment reviewed the potential for fossil resources on the Project site. No fossils were observed during the field survey, but deeper soils in the area are known to contain fossils.
To address this, the study recommends monitoring during grading with procedures for fossil recovery if needed. With these measures, potential impacts would be reduced to less than significant.
(e) Greenhouses Gasses (GHG) Assessment — The GHG Assessment evaluated whether the Project would create new or greater emissions compared to the previously approved Specific Plan. Modeling showed the Project would generate approximately 2,238 metric tons of CO₂e per year, which is below the City’s threshold of significance.
With compliance measures from the City’s Climate Action Plan, impacts would be less than significant.
(f) Phase 1 Environmental Site Assessment (ESA) Report — The Phase I ESA evaluated the site for potential environmental concerns. The property was historically used for agriculture and has been graded in recent years. No hazardous materials, contamination, or other concerns were identified on the site or nearby properties. The study concluded that the site is not affected by environmental conditions and no further investigation is required.
(g) Drainage Report — The Drainage Report evaluated stormwater conditions for the Project site. Development would increase runoff, but City standards limit discharge to 15.64 cubic feet per second. To meet this requirement, the Project will include an oversized private storm drain system with onsite storage and a flow restriction device. 696
Planning Commission Agenda Report
File Nos. PGPA24-003, PSPA24-004, PMTT24-008, & PDEV24-017 September 23, 2025
With these improvements, the site will manage runoff from a 100-year storm without creating downstream impacts.
(h) Noise Impact Analysis — The Noise Study evaluated potential construction and operational noise for the Project. Measurements and modeling showed that traffic, building equipment, and construction activities would remain within City and CEQA thresholds. Interior standards can be met with typical building construction. The study concluded that noise and vibration impacts are less than significant and no additional mitigation is required.
(i) Trip Generation/Vehicle Miles Traveled (VMT) Analysis — The Trip Generation Assessment compared traffic from the approved elementary school in the Esperanza Specific Plan with the proposed 161-unit residential project. The school was estimated to generate 949 daily trips, including 309 in the AM peak and 206 in the PM peak. The proposed residences are expected to generate 944 daily trips, with 108 AM and 125 PM peak trips. This represents a net reduction of 5 daily trips, 201 fewer AM peak trips, and 81 fewer PM peak trips compared to the school use. Because the Project results in fewer trips than previously approved, no additional traffic operations analysis is required.
The VMT Analysis evaluated the Project’s consistency with the City of Ontario’s adopted VMT thresholds. Modeling with the San Bernardino Traffic Analysis Model (SBTAM) showed that the Project would generate 22.3 daily VMT per service population under baseline conditions and 23.7 under buildout, both below the City’s threshold of 27.6. The Project also does not increase VMT per service population citywide under cumulative conditions.
The analysis concluded that impacts are less than significant, and the Project is consistent with City policies for circulation, active transportation, and transit. (j) Water Study — The Water Study evaluated whether the City’s existing water system can serve the 161-unit Project. The Project is estimated to use about 52,000 gallons of water per day. The onsite system will connect to the existing 8-inch lines in Amherst Avenue and Chatham Street. Modeling confirmed the City’s 925 Zone has sufficient capacity to provide both domestic service and required fire flows. The study concluded that the City’s water system can serve the Project and no offsite improvements are required.
(k) Sewer Study — The Sewer Study evaluated whether the City’s existing sewer system can accommodate the 161-unit Project. The Project is expected to generate about 28,000 gallons of wastewater per day. The onsite system will connect to the existing 8-inch line in Amherst Avenue and convey flows to larger downstream lines. Modeling confirmed that all downstream facilities have sufficient capacity to handle the added demand. The study concluded that the City’s sewer system can serve the Project and no offsite improvements are required.
697
Planning Commission Agenda Report
File Nos. PGPA24-003, PSPA24-004, PMTT24-008, & PDEV24-017 September 23, 2025
TECHNICAL APPENDIX:
Table 1: Surrounding Zoning and Land Uses
Existing
Land Use
Policy Plan
Designation
Zoning
Designation
Specific Plan
Land Use
Site Vacant Medium Density
(Proposed)
SP (Esperanza Specific
Plan)
PA-11 (RD-7)
(Proposed)
North Residential Low Density SP (Esperanza Specific
Plan) Park
South Residential Low Density SP (Esperanza Specific
Plan)
PA-7 (RD-1)
East Residential Medium Density SP (Esperanza Specific
Plan)
PA-4 (RD-6)
West Residential Low Density SP (Esperanza Specific
Plan) PA-10 (RD-3)
Table 2: General Site & Building Statistics
Item Required Min./Max. Provided (Ranges) Meets
Y/N
Project area (in acres): N/A 10.2 acres Y
Maximum project density
(dwelling units/ac): 16.07 DU/AC 16.07 DU/AC Y
Front yard setback (in FT): 10 FT 10.5 - 21.3 FT Y
Side yard setback (in FT): 10 FT 10 FT Y
Rear yard setback (in FT): 3-5 FT 29 – 44.5 FT Y
Maximum height (in FT): 45 FT 39.25 FT Y
Open space – private: 24,150 37,150 Y
Open space – common: 40,250 86,995 Y
Total no. of dwelling units: 112-255 Min/Max 161 Units Y 698
Planning Commission Agenda Report
File Nos. PGPA24-003, PSPA24-004, PMTT24-008, & PDEV24-017 September 23, 2025
Table 3: Parking Summary
Type of Use Units Parking Ratio Spaces
Required Spaces Provided
2-Bedroom Units 32
2.0 Spaces Per
Dwelling Unit,
Including 1 in a
Garage
64 322 Garage
17 Driveway
45 Uncovered
49 parallel 3-bedroom units 129
2.5 Spaces Per
Dwelling Unit,
Including 2 in a
Garage
323
Guest 161 1 Space Per 6 Units 27 30
TOTAL 414 433
Table 4: Dwelling Unit Statistics:
Unit Type Unit Size (in SF) No. Bedrooms No. Bathrooms No. Stories Private Open Space (in FT)
1 2,017 2 2.5 2 249
2 1859 3 2.5 2 234
3 1995 2 2.5 2 191
4 2004 3 2.5 2 289
4X 2,052 3 2.5 2 291
4CC 2112 3 2.5 2 300
5 2204 3 2.5 2 221
5 ACC 2,088 3 2.5 3 221
6 2288 3 3.5 3 152
699
Planning Commission Agenda Report
File Nos. PGPA24-003, PSPA24-004, PMTT24-008, & PDEV24-017 September 23, 2025
Exhibit A: PROJECT LOCATION MAP
700
Planning Commission Agenda Report
File Nos. PGPA24-003, PSPA24-004, PMTT24-008, & PDEV24-017 September 23, 2025
Exhibit B: FUTURE BUILDOUT TABLE
701
Planning Commission Agenda Report
File Nos. PGPA24-003, PSPA24-004, PMTT24-008, & PDEV24-017 September 23, 2025
702
Planning Commission Agenda Report
File Nos. PGPA24-003, PSPA24-004, PMTT24-008, & PDEV24-017 September 23, 2025
703
Planning Commission Agenda Report
File Nos. PGPA24-003, PSPA24-004, PMTT24-008, & PDEV24-017 September 23, 2025
Exhibit C: PROPOSED ESPERANZA SPECIFIC PLAN LAND USE PLAN 704
Planning Commission Agenda Report
File Nos. PGPA24-003, PSPA24-004, PMTT24-008, & PDEV24-017 September 23, 2025
Exhibit D: PROPOSED ESPERANZA SPECIFIC PLAN LAND USE SUMMARY 705
Planning Commission Agenda Report
File Nos. PGPA24-003, PSPA24-004, PMTT24-008, & PDEV24-017 September 23, 2025
Exhibit E: TENTATIVE TRACT MAP 20730
706
Exhibit F: SITE PLAN
707
Planning Commission Agenda Report
File No.: PGPA24-003, PSPA24-004, PMTT24-008, & PDEV24-017 September 23, 2025
Exhibit G: FLOOR PLAN
Typical 2 Story – First Floor
708
Planning Commission Agenda Report
File No.: PGPA24-003, PSPA24-004, PMTT24-008, & PDEV24-017 September 23, 2025
Typical 2 Story – Second Floor
709
Planning Commission Agenda Report
File No.: PGPA24-003, PSPA24-004, PMTT24-008, & PDEV24-017 September 23, 2025
Typical 3 Story – First Floor
710
Planning Commission Agenda Report
File No.: PGPA24-003, PSPA24-004, PMTT24-008, & PDEV24-017 September 23, 2025
Typical 3 Story – Second Floor
711
Planning Commission Agenda Report
File No.: PGPA24-003, PSPA24-004, PMTT24-008, & PDEV24-017 September 23, 2025
Typical 3 Story – Third Floor
712
Planning Commission Agenda Report
File No.: PGPA24-003, PSPA24-004, PMTT24-008, & PDEV24-017 September 23, 2025
Exhibit H: ELEVATIONS
2 Story Transitional Farmhouse
713
Planning Commission Agenda Report
File No.: PGPA24-003, PSPA24-004, PMTT24-008, & PDEV24-017 September 23, 2025
714
Planning Commission Agenda Report
File No.: PGPA24-003, PSPA24-004, PMTT24-008, & PDEV24-017 September 23, 2025
715
Planning Commission Agenda Report
File No.: PGPA24-003, PSPA24-004, PMTT24-008, & PDEV24-017 September 23, 2025
2 Story Transitional Spanish
716
Planning Commission Agenda Report
File No.: PGPA24-003, PSPA24-004, PMTT24-008, & PDEV24-017 September 23, 2025
717
Planning Commission Agenda Report
File No.: PGPA24-003, PSPA24-004, PMTT24-008, & PDEV24-017 September 23, 2025
718
Planning Commission Agenda Report
File No.: PGPA24-003, PSPA24-004, PMTT24-008, & PDEV24-017 September 23, 2025
3 Story Transitional Farmhouse
719
Planning Commission Agenda Report
File No.: PGPA24-003, PSPA24-004, PMTT24-008, & PDEV24-017 September 23, 2025
720
Planning Commission Agenda Report
File No.: PGPA24-003, PSPA24-004, PMTT24-008, & PDEV24-017 September 23, 2025
721
Planning Commission Agenda Report
File No.: PGPA24-003, PSPA24-004, PMTT24-008, & PDEV24-017 September 23, 2025
3 Story Transitional Spanish
722
Planning Commission Agenda Report
File No.: PGPA24-003, PSPA24-004, PMTT24-008, & PDEV24-017 September 23, 2025
723
Planning Commission Agenda Report
File No.: PGPA24-003, PSPA24-004, PMTT24-008, & PDEV24-017 September 23, 2025
724
Planning Commission Agenda Report
File No.: PGPA24-003, PSPA24-004, PMTT24-008, & PDEV24-017 September 23, 2025
Exhibit I: LANDSCAPE PLAN
725
Planning Commission Agenda Report
File No.: PGPA24-003, PSPA24-004, PMTT24-008, & PDEV24-017 September 23, 2025
Exhibit J: SITE PHOTOS
726
Planning Commission Agenda Report
File No.: PGPA24-003, PSPA24-004, PMTT24-008, & PDEV24-017 September 23, 2025
727
Planning Commission Agenda Report
File No.: PGPA24-003, PSPA24-004, PMTT24-008, & PDEV24-017 September 23, 2025
728
Planning Commission Agenda Report
File No.: PGPA24-003, PSPA24-004, PMTT24-008, & PDEV24-017 September 23, 2025
Attachment A:
Mountain View School District Letter
(Document to follow this page)
729
Planning Commission Agenda Report
File No.: PGPA24-003, PSPA24-004, PMTT24-008, & PDEV24-017 September 23, 2025
Attachment B:
Opposition Letters
(Document to follow this page)
730
Planning Commission Agenda Report
File No.: PGPA24-003, PSPA24-004, PMTT24-008, & PDEV24-017 September 23, 2025
Resolutions for:
Addendum
File Nos. PGPA24-003, PSPA24-004, PMTT24-008, & PDEV24-017 (Documents to follow this page)
731
732
From: Cinthia Hernandez
To: Robert Morales
Cc: Planning Director; Records Management; Public Comments Subject: Opposition to Re-Zoning School Site for Housing (Project File Nos. PGPA24-003, PDEV24-033) Date: Friday, September 12, 2025 1:32:54 PM
To the City of Ontario Planning Commission,
As a resident of Ontario, I am writing to express my opposition to the proposed change of the designated school site at the corner of Eucalyptus Avenue and Campus Avenue into a housing development.
This land was originally designated for a school, and with the rapid pace of housing growth in our community, the need for additional educational facilities is more urgent than ever. In just the past five years, hundreds of new homes have been added in the Ontario Ranch community, yet school growth has not kept up with the number of children entering and preparing to enter the public school system. Converting this land into 129 new homes will only add more students to an already strained system.
Ontario families were led to believe that this parcel would serve the community as a school.
Changing that designation now would break faith with the residents who relied on that plan when choosing to live here.
I respectfully urge the Planning Commission and City Council to uphold the original vision for this site as a school and reject the proposed zoning change. Our children’s education, safety, and quality of life should come before additional housing density.
Thank you for your consideration.
Sincerely,
Cinthia Hernandez
4516 S. Amherst Ave, Ontario, CA 91761
733
From: Diana Herrera
To: Robert Morales
Cc: Public Comments; Records Management; Planning Director Subject: Opposition to Re-Zoning School Site for Housing (Project File Nos. PGPA24-003, PDEV24-033) Date: Friday, September 12, 2025 3:17:01 PM
To the City of Ontario Planning Commission,
As a resident of Ontario, I am writing to express my opposition to the proposed change of the designated school site at the corner of Eucalyptus Avenue and Campus Avenue into a housing development.
This land was originally designated for a school, and with the rapid pace of housing growth in our community, the need for additional educational facilities is more urgent than ever. In just the past five years, hundreds of new homes have been added in the Ontario Ranch community, yet school growth has not kept up with the number of children entering and preparing to enter the public school system. Converting this land into 129 new homes will only add more students to an already strained system.
Ontario families were led to believe that this parcel would serve the community as a school.
Changing that designation now would break faith with the residents who relied on that plan
when choosing to live here.
I respectfully urge the Planning Commission and City Council to uphold the original vision for this site as a school and reject the proposed zoning change. Our children’s education, safety, and quality of life should come before additional housing density.
Thank you for your consideration.
Sincerely,
Diana Herrera
[email protected]
4517 S. Mendocino Ave
Ontario, CA 91761
734
From: James
To: Robert Morales
Cc: Planning Director; Records Management; Public Comments Subject: Opposition to Re-Zoning School Site for Housing (Project File Nos. PGPA24-003, PDEV24-033) Date: Saturday, September 13, 2025 9:35:27 AM
To the City of Ontario Planning Commission,
As a resident of Ontario, I am writing to express my opposition to the proposed change of the designated school site at the corner of Eucalyptus Avenue and Campus Avenue into a housing development.
This land was originally designated for a school, and with the rapid pace of housing growth in our community, the need for additional educational facilities is more urgent than ever. In just the past five years, hundreds of new homes have been added in the Ontario Ranch community, yet school growth has not kept up with the number of children entering and preparing to enter the public school system. Converting this land into 129 new homes will only add more students to an already strained system.
Ontario families were led to believe that this parcel would serve the community as a school.
Changing that designation now would break faith with the residents who relied on that plan when choosing to live here.
I respectfully urge the Planning Commission and City Council to uphold the original vision for this site as a school and reject the proposed zoning change. Our children’s education, safety, and quality of life should come before additional housing density.
Thank you for your consideration.
Sincerely,
James Dortch
4485 S Mendocino Ave [google.com]
Ontario, CA 91761 [google.com]
735
From: Kayci Dortch
To: Robert Morales
Cc: Planning Director; Records Management; Public Comments Subject: Opposition to Re-Zoning School Site for Housing (Project File Nos. PGPA24-003, PDEV24-033) Date: Friday, September 12, 2025 5:13:29 PM
To the City of Ontario Planning Commission,
As a resident of Ontario, I am writing to express my opposition to the proposed change of the designated school site at the corner of Eucalyptus Avenue and Campus Avenue into a housing development.
This land was originally designated for a school, and with the rapid pace of housing growth in our community, the need for additional educational facilities is more urgent than ever. In just the past five years, hundreds of new homes have been added in the Ontario Ranch community, yet school growth has not kept up with the number of children entering and preparing to enter the public school system. Converting this land into 129 new homes will only add more students to an already strained system.
Ontario families were led to believe that this parcel would serve the community as a school.
Changing that designation now would break faith with the residents who relied on that plan when choosing to live here.
I respectfully urge the Planning Commission and City Council to uphold the original vision for this site as a school and reject the proposed zoning change. Our children’s education, safety, and quality of life should come before additional housing density.
Thank you for your consideration.
Sincerely,
Kayci Dortch
4485 S Mendocino Ave
Ontario, CA 91761
736
From: Kirstie Gracia
To: Robert Morales
Cc: Records Management; Planning Director; Public Comments Subject: Opposition to Re-Zoning School Site for Housing (Project File Nos. PGPA24-003, PDEV24-033) Date: Friday, September 12, 2025 6:28:34 PM
To the City of Ontario Planning Commission,
As a resident of Ontario, I am writing to express my opposition to the proposed change of the designated school site at the corner of Eucalyptus Avenue and Campus Avenue into a housing development.
This land was originally designated for a school, and with the rapid pace of housing growth in our community, the need for additional educational facilities is more urgent than ever. In just the past five years, hundreds of new homes have been added in the Ontario Ranch community, yet school growth has not kept up with the number of children entering and preparing to enter the public school system. Converting this land into 129 new homes will only add more students to an already strained system.
Ontario families were led to believe that this parcel would serve the community as a school. Changing that designation now would break faith with the residents who relied on that plan when choosing to live here.
I respectfully urge the Planning Commission and City Council to uphold the original vision for this site as a school and reject the proposed zoning change. Our children’s education, safety, and quality of life should come before additional housing density.
Thank you for your consideration.
Sincerely,
--
Kirstie M. Garcia
737
From: Miao Gao
To: Robert Morales
Cc: Public Comments; Planning Director; Records Management Subject: Opposition to Re-Zoning School Site for Housing (Project File Nos. PGPA24-003, PDEV24-033) Date: Sunday, September 14, 2025 4:48:43 PM
To the City of Ontario Planning Commission,
As a resident of Ontario, I am writing to express my opposition to the proposed change of the
designated school site at the corner of Eucalyptus Avenue and Campus Avenue into a housing
development.
This land was originally designated for a school, and with the rapid pace of housing growth in
our community, the need for additional educational facilities is more urgent than ever. In just the
past five years, hundreds of new homes have been added in the Ontario Ranch community, yet
school growth has not kept up with the number of children entering and preparing to enter the
public school system. Converting this land into 129 new homes will only add more students to
an already strained system.
Ontario families were led to believe that this parcel would serve the community as a school.
Changing that designation now would break faith with the residents who relied on that plan
when choosing to live here.
I respectfully urge the Planning Commission and City Council to uphold the original vision for
this site as a school and reject the proposed zoning change. Our children’s education, safety,
and quality of life should come before additional housing density.
Thank you for your consideration.
Miao Gao
3925 E Fincastle St
Ontario, CA
738
From: Nikko Erick Reyes
To: Robert Morales
Cc: Planning Director; Records Management; Public Comments Subject: Opposition to Re-Zoning School Site for Housing (Project File Nos. PGPA24-003, PDEV24-033) Date: Friday, September 12, 2025 5:49:33 PM
To the City of Ontario Planning Commission,
As a resident of Ontario, I am writing to express my opposition to the proposed change of the designated school site at the corner of Eucalyptus Avenue and Campus Avenue into a housing development.
This land was originally designated for a school, and with the rapid pace of housing growth in our community, the need for additional educational facilities is more urgent than ever. In just the past five years, hundreds of new homes have been added in the Ontario Ranch community, yet school growth has not kept up with the number of children entering and preparing to enter the public school system. Converting this land into 129 new homes will only add more students to an already strained system.
Ontario families were led to believe that this parcel would serve the community as a school.
Changing that designation now would break faith with the residents who relied on that plan when choosing to live here.
I respectfully urge the Planning Commission and City Council to uphold the original vision for this site as a school and reject the proposed zoning change. Our children’s education, safety, and quality of life should come before additional housing density.
Thank you for your consideration.
Sincerely,
Nikko Reyes
S. Mendocino Ave. Ontario, CA 91761
Nikko Erick Reyes
[email protected]
http://www.niknokseyer.com [niknokseyer.com]
[twitter.com] [facebook.com] [plus.google.com] [linkedin.com] [instagram.com] [youtube.com] [github.com]
[youracclaim.com]
739
From: Vivi Yuan
To: Robert Morales
Cc: Planning Director; Records Management; Public Comments Subject: Opposition to Re-Zoning School Site for Housing (Project File Nos. PGPA24-003, PDEV24-033) Date: Monday, September 15, 2025 8:32:39 PM
Dear Planning Commission and City Council Members,
As a resident of Ontario and mother of 3 little kids, I am writing to express my strong opposition to the proposed change of the designated school site at the corner of Eucalyptus Avenue and Campus Avenue into a housing development.
This parcel was originally set aside for a school. With the rapid pace of housing growth in our community, the need for additional educational facilities is more urgent than ever. In the past five years alone, hundreds of new homes have been built in the Ontario Ranch community, yet school construction has not kept pace with the number of children entering and preparing to enter the public school system. Converting this land into 129 new homes will only increase student enrollment pressures on an already strained system.
Ontario families were assured that this property would serve the community as a school site. Changing its designation now would not only undermine careful community planning but also break the trust of residents who relied on that commitment when deciding to move here.
I respectfully urge the Planning Commission and City Council to uphold the original vision for this site as a school and reject the proposed zoning change. Our children’s education, safety, and overall quality of life must take precedence over additional housing density.
Thank you for your time and consideration.
Sincerely,
740
Vivian Chang
3915E Fincastle st Ontario
741
RESOLUTION NO. PC25-047
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
ONTARIO, CALIFORNIA, APPROVING THE USE OF AN ADDENDUM TO THE ONTARIO PLAN 2050 SUPPLEMENTAL ENVIRONMENTAL
IMPACT REPORT, IN ACCORDANCE WITH THE CALIFORNIA
ENVIRONMENTAL QUALITY ACT, AS AMENDED, FOR FILE NOS.
PMTT24-008 AND PDEV24-017, AND RECOMMENDING THE CITY
COUNCIL APPROVE THE USE OF THE ADDENDUM FOR FILE NOS.
PGPA24-003 AND PSPA24-004.
WHEREAS, GDC Investments 13, LP (Applicant) filed an Applications for the following: [1] An General Plan Amendment (File No. PGPA24-003) to The Ontario Plan (TOP) 2050 Policy Plan (General Plan) Land Use Map to change the land use designation on approximately 10.02 acres of land, located south of Chatham Street, west of Clifton Avenue, east of Amherst Avenue, and north of Eucalyptus Avenue, from Public School to Medium Density Residential; [2] A Specific Plan Amendment (File No. PSPA24-004) to the Esperanza Specific Plan to revise the specific plan for consistency with TOP Policy Plan (General Plan) Land Use Map. The amendment includes [i] revising the allowed uses within Planning Area 11 from School to RD-7/Row Townhomes; and [ii] modifying the Specific Plan land use map, development standards, exhibits, and text to reflect the proposed land use changes; [3] A Tentative Tract Map (TTM 20730) (File No. PMTT24- 008) for condominium purposes to subdivide approximately 10.02 acres into 28 numbered lots and 15 lettered lots, located within Planning Area 11 (RD-7/Row Townhomes) of the Esperanza Specific Plan; and [4] A Development Plan (File No. PDEV24-017) to construct 161 multiple-family dwellings on approximately 10.02 acres, located within Planning Area 11 (RD-7/Row Townhomes) of the Esperanza Specific Plan. (hereinafter referred to as Application or Project); and
WHEREAS, the City of Ontario certified the Environmental Impact Report prepared for TOP and associated Statement of Overriding Considerations, and issued Resolution No. 2010-003; and
WHEREAS, the City of Ontario adopted the Policy Plan (General Plan) as part of the component framework for TOP on January 27, 2010, and issued Resolution No. 2010- 004; and
WHEREAS, the City of Ontario certified the Supplemental Environmental Impact Report (SEIR), for the General Plan Amendment for TOP 2050 Technical Update on August 16, 2022; and
WHEREAS, TOP 2050 Supplemental Environmental Impact Report (SEIR)(State Clearinghouse No. 2021070364) was certified on August 16, 2022 (hereinafter referred to as Certified EIR), in which development and use of the Project site was discussed; and 742
Planning Commission Resolution
Addendum for File Nos. PGPA24-003, PSPA24-004, PMTT24-008, and PDEV24-017 September 23, 2025
WHEREAS, the Planning Director of the City of Ontario has prepared and approved for attachment to the certified Supplemental Environmental Impact Report (SEIR), an Addendum to the Certified SEIR (hereinafter referred to as SEIR Addendum) in accordance with the requirements of the California Environmental Quality Act of 1970, together with State and local guidelines implementing said Act, all as amended to date (collectively referred to as CEQA); and
WHEREAS, the SEIR Addendum concluded that implementation of the Project could result in a number of significant effects on the environment that were previously analyzed in the Certified SEIR, and that the Certified SEIR identified mitigation measures that would reduce each of those significant effects to a less-than-significant level; and WHEREAS, pursuant to State CEQA Guidelines Section 15164(a), a lead agency shall prepare an addendum to a previously certified EIR if some changes or additions are necessary to a project, but the preparation of a subsequent or supplemental EIR is not required; and
WHEREAS, the City determined that none of the conditions requiring preparation of a subsequent or supplemental EIR would occur from the Project, and that preparation of an Addendum to the Certified SEIR was appropriate; and WHEREAS, the City of Ontario is the lead agency on the Project, and the Planning Commission is the recommending body for the General Plan Amendment (File No.
PGPA24-003) and Specific Plan Amendment (File No. PSPA24-004), as well as the decision-making body for the Tentative Tract Map (File No. PMTT24-008) and Development Plan (File No. PDEV24-017); and
WHEREAS, the Planning Commission has reviewed and considered the SEIR Addendum for the Project, has concluded that none of the conditions requiring preparation of a subsequent of supplemental EIR have occurred, and intends to take actions on the Project in compliance with CEQA and state and local guidelines implementing CEQA; and
WHEREAS, the SEIR Addendum for the Project is on file in the Planning Department, located at 303 East B Street, Ontario, CA 91764, is available for inspection by any interested person at that location and is, by this reference, incorporated into this Resolution as if fully set forth herein; and
WHEREAS, all legal prerequisites to the adoption of this Resolution have occurred.
NOW, THEREFORE, IT IS HEREBY FOUND, DETERMINED, AND RESOLVED by the Planning Commission of the City of Ontario, as follows:
743
Planning Commission Resolution
Addendum for File Nos. PGPA24-003, PSPA24-004, PMTT24-008, and PDEV24-017 September 23, 2025
SECTION 1: Environmental Determination and Findings. As the recommending body for the General Plan Amendment (File No. PGPA24-003) and Specific Plan Amendment (File No. PSPA24-004), and the decision-making body for the Tentative Tract Map (PMTT24-008) and Development Plan (File No. PDEV24-017). The Planning Commission has reviewed and considered the information contained in the administrative record for the Project. Based upon the facts and information contained in the administrative record, including all written and oral evidence presented to the Planning Commission, the Planning Commission finds as follows:
(1) The environmental impacts of this Project were reviewed in conjunction with an Addendum to TOP 2050 Supplemental Environmental Impact Report (SEIR)(State Clearinghouse No. 2021070364), certified by the Ontario City Council on August16, 2022, in conjunction with File No. PGPA20-002; and
(2) The SEIR Addendum and administrative record have been completed in compliance with CEQA, the State CEQA Guidelines, and the City of Ontario Local CEQA Guidelines; and
(3) The City's "Local Guidelines for Implementing the California Environmental Quality Act (CEQA)" provide for the use of a single environmental assessment in situations where the impacts of subsequent projects are adequately analyzed. This Application introduces no new significant environmental impacts; and (4) All previously adopted mitigation measures shall be a condition of project approval, as they are applicable to the Project, and are incorporated herein by this reference; and
(5) The SEIR Addendum contains a complete and accurate reporting of the environmental impacts associated with the Project, and reflects the independent judgment of the Planning Commission; and
(6) There is no substantial evidence in the administrative record supporting a fair argument that the Project may result in significant environmental impacts.
SECTION 2: Additional Environmental Review Not Required. Based on the Addendum, all related information presented to the Planning Commission, and the specific findings set forth in Section 1, above, the Planning Commission finds that the preparation of a subsequent or supplemental Environmental Impact Report is not required for the Project, as the Project:
(1) Does not constitute substantial changes to the Certified SEIR that will require major revisions to the Certified SEIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; and
744
Planning Commission Resolution
Addendum for File Nos. PGPA24-003, PSPA24-004, PMTT24-008, and PDEV24-017 September 23, 2025
(2) Does not constitute substantial changes with respect to the circumstances under which the Certified SEIR was prepared, that will require major revisions to the Certified SEIR due to the involvement of new significant environmental effects or a substantial increase in the severity of the previously identified significant effects; and (3) Does not contain new information of substantial importance that was not known and could not have been known with the exercise of reasonable diligence at the time the Certified SEIR was certified/adopted, that shows any of the following:
(a) The Project will have one or more significant effects not discussed in the Certified SEIR; or
(b) Significant effects previously examined will be substantially more severe than shown in the Certified SEIR; or
(c) Mitigation measures or alternatives previously found not to be feasible would in fact be feasible and would substantially reduce one or more significant effects of the Project, but the City declined to adopt such measures; or (d) Mitigation measures or alternatives considerably different from those analyzed in the Certified SEIR would substantially reduce one or more significant effects on the environment, but which the City declined to adopt.
SECTION 3: Planning Commission Action. Based upon the findings and conclusions set forth in Sections 1 and 2, above, the Planning Commission hereby recommends the City Council finds that based upon the entire record of proceedings before it, and all information received, that there is no substantial evidence that the Project will constitute substantial changes to the Certified SEIR, and does hereby approve the SEIR Addendum, attached hereto as "Attachment A," and incorporated herein by this reference.
SECTION 4: Indemnification. The Applicant shall agree to defend, indemnify and hold harmless, the City of Ontario or its agents, officers, and employees from any claim, action or proceeding against the City of Ontario or its agents, officers or employees to attack, set aside, void, or annul this approval. The City of Ontario shall promptly notify the Applicant of any such claim, action, or proceeding, and the City of Ontario shall cooperate fully in the defense.
SECTION 5: Custodian of Records. The documents and materials that constitute the record of proceedings on which these findings have been based are located at the City of Ontario City Hall, 303 East B Street, Ontario, California 91764. The custodian for these records is the City Clerk of the City of Ontario. 745
746
747
Planning Commission Resolution
Addendum for File Nos. PGPA24-003, PSPA24-004, PMTT24-008, and PDEV24-017 September 23, 2025
ATTACHMENT A:
Addendum to The Ontario Plan 2050 Supplemental
Environmental Impact Report
(State Clearinghouse No. 2021070364)
(Addendum to follow this page)
748
749
1. Project Title/File Nos.: Esperanza PA-11 SPA/File Nos.: PPA24-0139, PGPA24-004, PSPA24-004, PDEV24-017, PMTT24-008, PDA25-003
2. Lead Agency: City of Ontario-Planning Department, 303 East B Street, Ontario, CA 91764
3. Contact Person: Robert Morales, Phone: (909) 395-2432, Email:
[email protected]
4. Project Sponsor: GDC Investments 14, LP; 12770 El Camino Real, Suite 220, San Diego, CA 92130
5. Project Location: The Project site is located in southwestern San Bernardino County, within the City of Ontario. Ontario is located approximately 40 miles from downtown Los Angeles, 20 miles from downtown San Bernardino, and 30 miles from Orange County. Please refer to Figure 1, Regional Location Map. As shown in Figure 2, Aerial Site Photograph, the Project site is bound by Eucalyptus Avenue to the south, South Amherst Avenue to the west, Chatham Street to the north, and Clifton Avenue to the east. Regional access is provided via Interstate 15 (I-15) and State Route 60 (SR-60).
6. Policy Plan (General Plan) Designation: Existing - Public School (PS); Proposed – Medium Density Residential (MRD).
7. Zoning Designation: Existing – School under the Ontario Esperanza Specific Plan; Proposed – Planning Area 11 (RD-7 / Row Townhomes of the Esperanza Specific Plan
750
Project Site
EUCALYPTUS AVE
S HAVEN AVE
ONTARIO RANCH RD
E RIVERSIDE DR
BELLEGRAVE AVE
ARCHIBALD AVE
SCHLEISMAN RD
LIMONITE AVE
CHINO AVE
MISSION BLVD
S HAVEN AVE
S CLEVELAND AVE
HAMMER AVE RIVERSIDE COUNTY
SAN BERNARDINO COUNTY
ARCHIBALD AVE
WINEVILLE AVE
ETIWANDA AVE
LIMONITE AVE
HAMMER AVE
EASTVALE
JURUPA
VALLEY
NORCO
Swan Lake
·|þ}60
·|þ}60
%&'(15
UP
Regional Location Map
FORM J
0 1,750 3,500 875
Feet
Source(s): ESRI, NearMap Imagery (May 2024), SB County (2024), RCIT (2024)
Figure 1
Addendum to The Ontario Plan 2050 Supplemental Environmental Impact Report File No(s).: PPA24-0139, PGPA24-004, PSPA24-004, PDEV24-017, PMTT24-008, PDA25-003 751
Project Site
CHATHAM ST
CLIFTON AVE
E EUCALYPTUS AVE
S AMHERST AVE
E SUNSET ST
E MALAGON PRIVADO
E CATAALINA ST
S AFTON PRIVADO
E AMIGOS PRIVADO
S ANNISTON AVE
E EUCALYPTUS AVE
S AMHERST AVE
CLIFTON AVE
Aerial Site Photograph
FORM J
0 150 300 75
Feet
Source(s): ESRI, NearMap Imagery (May 2024) Figure 2
Addendum to The Ontario Plan 2050 Supplemental Environmental Impact Report File No(s).: PPA24-0139, PGPA24-004, PSPA24-004, PDEV24-017, PMTT24-008, PDA25-003
752
Addendum to The Ontario Plan 2050 Supplemental Environmental Impact Report File No(s).: PPA24-0139, PGPA24-004, PSPA24-004, PDEV24-017, PMTT24-008, PDA25-003
8. Description of Project: The Project proposed the following entitlements:
1. A General Plan Amendment (File No. PGPA24-004) to change the land use designation of the Project site from Public School (PS) to Medium Density Residential (MDR).
2. A Specific Plan Amendment (File No. PSPA24-004) to the Ontario Ezperanza Specific Plan (adopted on February 6, 2007) to change the land use designation of approximately 10.02 net acres of land from School to MDR 25. The amended Specific Plan is presented as Appendix A to this Addendum.
3. A Development Plan (File No. PDEV24-017) to construct 161 multi-family residential units on approximately 10.02 net acres (APN:
1073-101-05). The Project would also include amenities including a pool/spa, playground, shaded barbecue/picnic area, fitness stations, and open turf areas. Refer to Figure 3, Site Plan.
4. Tentative Parcel Map (File No. PMTT24-008).
5. Development Agreement (PDA25-003) between the City of Ontario and the Project Applicant pursuant to California Government Code Sections 65864 et seq.
Building Characteristics and Operations
The Project proposes a mix of 2-story (69) and 3-story (92) units. Units would range in size from 1,350 to 1,717 square feet. Representative elevations of each building type are presented in Figures 4 and 5. Although color schemes would vary on each of the buildings, the color palette of the Project features neutral building tones, accented with siding, stucco, and wall tile accents. Buildings would range from approximately 28’ to 39’ high.
Circulation and Parking
Vehicular access will be provided via a driveway off of Chatham Street and another off Amherst Avenue. The Project also includes a total of 433 parking spaces, comprised of 322 garage spaces, 45 uncovered spaces, 17 driveway spaces, and 49 off-site parallel spaces.
753
754
755
756
Addendum to The Ontario Plan 2050 Supplemental Environmental Impact Report File No(s).: PPA24-0139, PGPA24-004, PSPA24-004, PDEV24-017, PMTT24-008, PDA25-003
Landscaping, Walls, and Lighting
The landscape concept proposes California-friendly plant materials consistent with the Esperanza Specific Plan. As depicted in Figure 6, Landscape Plan, a variety of trees, shrubs, accent plants, and ground cover are proposed along the perimeter of the Project site, and throughout the community. A total of 494 trees are proposed on-site. Accent specimen 36" box and 48" box trees would be provided at corners and entries. Consistent with City standards, 25 percent of tree species planted on-site would be California natives.
The Project would construct a 6-foot community theme wall along Eucalyptus Avenue. Corner entry monuments would be implemented at the corners of Eucalyptus Avenue/Amherst Avenue and Eucalyptus Avenue/Clifton Avenue.
The Project’s primary entry off Chatham Street would be flanked by entry monuments on either side.
Exterior lighting would be installed on-site, as necessary, for safety, security, and wayfinding. Decorative architectural lighting as well as landscape lighting would also be installed to accent building entries as focal points throughout the site. Ornamental landscaping, lighting, walls, and utility infrastructure improvements/connections would be installed per compliance with the City's Municipal Code.
Infrastructure Improvements
Currently, the Project site is fully graded. Adjacent streets have been previously constructed, and no off-site roadways are anticipated as part of the Project.
Peripheral improvements such as sidewalk and curb upgrades will be completed as part of the Project. Utility stubs currently exist adjacent to the site.
Water service to the Project site would be provided by the Ontario Municipal Utilities Company (OMUC). The Project on-site water system would connect to existing 8-inch water lines in Amherst Avenue and Chatham Street adjacent to the site. See Figure 7, Water Plan.
757
758
759
Addendum to The Ontario Plan 2050 Supplemental Environmental Impact Report File No(s).: PPA24-0139, PGPA24-004, PSPA24-004, PDEV24-017, PMTT24-008, PDA25-003
Sanitary sewer service to the Project site would be provided by Inland Empire Utilities Agency (IEUA). Proposed on-site sewer lines would connect to an existing 8-inch line in South Amherst Avenue, adjacent to the site. See Figure 8, Sewer Plan.
The Project site currently drains in a southwesterly direction towards the intersection of Eucalyptus Avenue and Amherst Avenue where an on-site detention basin is located. The basin has a 36-inch inlet that joins a public storm drain in Amherst Avenue. The Project would implement an on-site storm drain system that generally maintains the existing drainage pattern and connects to the existing storm drain in Amherst Avenue. The Projects on-site storm drainage system would function as a flow restriction by oversizing the on-site capacity and providing on-site storage to ensure outflow would be consistent with the capacity of the surrounding storm drainage system.
Dry utilities serving the Project area include Southern California Edison, Southern California Gas Company, and various telecommunication providers.
The Project would include installation of on-site dry utility infrastructure that is anticipated to connect with the existing infrastructure available in the vicinity.
It is noted that the Project would not require natural gas infrastructure or service.
GHG-Reduction Features
The Project includes the following design features aimed at reducing the Project’s GHG emissions.
• Building Electrification
o Electric Space Heater
o Electric Water Heater
o Electric Stove
o Electric Dryer
o Electric Pool Heater
o Electric Spa Heater
o Lack of Natural Gas Infrastructure
760
761
Addendum to The Ontario Plan 2050 Supplemental Environmental Impact Report File No(s).: PPA24-0139, PGPA24-004, PSPA24-004, PDEV24-017, PMTT24-008, PDA25-003
• Vehicle Electrification
o Installation of Level 2 EV or higher charging stations at a rate of 30% or more of required vehicle spaces.
• Waste Diversion
o Storage and collection of green waste, organic waste, and recyclables.
• Water Conservation
o Water efficient showerheads and faucets
o Outdoor landscaping consists of drought tolerant, low maintenance plants with a drip irrigation or weather-based controller sprinkler system.
Please also refer to Checklist item 8, Greenhouse Gas Emissions.
Project Construction Characteristics:
Phased construction is expected to commence in early 2025 and would last through the remainder of the year. Construction activities are as follows:
• Demolition
• Site Preparation & Grading
• Building Construction
• Paving
• Architectural Coating & Landscaping
The site would not require any import/export of soils to accommodate the Project.
762
Addendum to The Ontario Plan 2050 Supplemental Environmental Impact Report File No(s).: PPA24-0139, PGPA24-004, PSPA24-004, PDEV24-017, PMTT24-008, PDA25-003
9. Project Setting: As shown in previous Figure 2, the Project site is currently vacant, undeveloped property. The site is surrounded by existing and/or approved residential uses, as well as an approved park use. Although sidewalks, curbs, gutters, and streetlights are in place along the site’s perimeter, upgrades will occur to better accommodate the Project.
10.Background: On January 27, 2010, the Ontario City Council adopted The Ontario Plan (“TOP”). An Environmental Impact Report (“EIR”) was prepared for TOP (State Clearinghouse No. 2008101140) and certified by the City Council on January 27, 2010 (hereinafter referred to as “Certified EIR”), which included Mitigation, Findings and a Statement of Overriding Considerations pursuant to the requirements of the California Environmental Quality Act, commencing with Public Resources Code Section 21000 (“CEQA”). Subsequently, on August 16, 2022, the Ontario City Council adopted The Ontario Plan 2050 (“TOP 2050”), an update to TOP. TOP 2050 serves as the framework for the City’s business plan and provides a foundation for the City to operate as a municipal corporation that consists of six (6) distinct components: 1) Vision; 2) Governance Manual; 3) Policy Plan; 4) Council Priorities; 5) Implementation; and 6) Tracking and Feedback. The Policy Plan component of TOP 2050 meets the functional and legal mandate of a General Plan and contains nine elements: Land Use, Housing, Parks and Recreation, Environmental Resources, Community Economics, Safety, Mobility, Community Design and Social Resources.
A Supplemental Environmental Impact Report (“SEIR”) was prepared for TOP 2050 (State Clearinghouse No. 2021070364) and was certified by the City Council on August 16, 2022 (hereinafter referred to as “Certified SEIR”). The Certified SEIR analyzed the direct and physical changes in the environment that would be caused by TOP 2050; focusing on changes to land use associated with the buildout of the proposed land use plan compared to the TOP, and in the Policy Plan and impacts resultant of population and employment growth in the City.
The Project site was analyzed in the Certified SEIR as a school use. 763
Addendum to The Ontario Plan 2050 Supplemental Environmental Impact Report File No(s).: PPA24-0139, PGPA24-004, PSPA24-004, PDEV24-017, PMTT24-008, PDA25-003
It is also noted that the Project site is located within the Ezperanza Specific Plan area. As originally envisioned, the 223-acre Specific Plan area included 916 single-family residential dwelling units, 494 cluster/town home dwelling units, a 10-acre elementary school site, and a total of nine acres of park land. The Specific Plan included a caveat that if the Mountain View School District chose not to utilize the school site, up to 46 residential units could be developed in place of the school. An EIR was prepared for the Specific Plan in 2006.
Since the time of the Specific Plan EIR, the School District has decided not to acquire the 10-acre site. As such, the Specific Plan Amendment (SPA) analyzed within this Addendum reflects the use of the previous school site for the development of the residential uses proposed by the Project.
Because of the age of the Specific Plan EIR (2006), this document tiers off the SEIR prepared for TOP 2050 (2022) in an effort to reflect more current environmental conditions and study methodologies. Notwithstanding, the Esperanza Specific Plan EIR included various mitigation measures for the entire Specific Plan area. Some of these mitigation measures remain applicable to the Project considered herein. Appendix B to this Addendum contains a complete listing of all mitigation required within the Esperanza Specific Plan EIR and provides an applicability determination for the Esperanza PA-11 SPA Project. The City would require the implementation of the applicable measures as Conditions of Approval for the Project.
11.CEQA Requirements for an Addendum: If changes to a project or its circumstances occur or new information becomes available after adoption of a previous EIR or negative declaration, the lead agency may: (1) prepare a subsequent EIR if the criteria of State CEQA Guidelines Section 15162(a) are met, (2) prepare a subsequent negative declaration, (3) prepare an addendum, or (4) prepare no further documentation. (State CEQA Guidelines Section 15162(b)). When only minor technical changes or additions to the previous EIR or negative declaration are necessary and none of the conditions described in section 15162 calling for the preparation of a subsequent EIR or negative declaration have occurred, CEQA allows the lead agency to prepare and adopt an addendum. (State CEQA Guidelines Section 15164(b).) 764
Addendum to The Ontario Plan 2050 Supplemental Environmental Impact Report File No(s).: PPA24-0139, PGPA24-004, PSPA24-004, PDEV24-017, PMTT24-008, PDA25-003
Under Section 15162, a subsequent EIR or negative declaration is required only when:
1) Substantial changes are proposed in the project which will require major revisions of the previous EIR or negative declaration due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; 2) Substantial changes occur with respect to the circumstances under which the project is undertaken which will require major revisions of the previous EIR or negative declaration due to the involvement of any new significant environmental effects or a substantial increase in the severity of previously identified significant effects; or 3) New information of substantial importance, which was not known and could not have been known with the exercise of reasonable diligence at the time the previous EIR or negative declaration was adopted, shows any of the following:
a) The project will have one or more significant effects not discussed in the previous EIR;
b) Significant effects previously examined will be substantially more severe than shown in the previous EIR;
c) Mitigation measures or alternatives previously found not to be feasible would in fact be feasible and would substantially reduce one or more significant effects of the project, but the project proponents decline to adopt the mitigation measure or alternative; or
d) Mitigation measures or alternatives which are considerably different from those analyzed in the previous EIR would substantially reduce one or more significant effects on the environment, but the project proponents decline to adopt the mitigation measure or alternative.
765
Addendum to The Ontario Plan 2050 Supplemental Environmental Impact Report File No(s).: PPA24-0139, PGPA24-004, PSPA24-004, PDEV24-017, PMTT24-008, PDA25-003
Thus, if the Project does not result in any of the circumstances listed in Section 15162 (i.e., no new or substantially greater significant impacts), the City may properly adopt an addendum to the Certified SEIR.
12.Analysis: According to CEQA Guidelines Section 15164, an Addendum to a previously certified EIR may be used if some changes or additions are necessary, but none of the conditions described in Section 15162 requiring the preparation of a subsequent Negative Declaration or EIR have occurred. The CEQA Guidelines require that a brief explanation be provided to support the findings that no subsequent EIR or Negative Declaration are needed for further discretionary approval. These findings are described below:
1) Required Finding: Substantial changes are not proposed for the project that will require major revisions of the previous EIR due to the involvement of new, significant environmental effects or a substantial increase in the severity of previously identified significant effects.
Substantial changes are not proposed by the Project and Project implementation will not require revisions to the Certified SEIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects. The Certified SEIR analyzed the direct and physical changes in the environment that would be caused by TOP 2050, focusing on changes to land use associated with the buildout of the proposed land use plan. In addition, all applicable adopted mitigation measures are a condition of Project approval and are incorporated herein by reference. This Addendum provides an analysis of the Project and verification that the Project will not cause environmental impacts such that any of the circumstances identified in State CEQA Guidelines Section 15162 are present.
2) Required Finding: Substantial changes have not occurred with respect to the circumstances under which the project is undertaken, that would require major revisions of the previous Environmental Impact Report due to the involvement of new significant 766
Addendum to The Ontario Plan 2050 Supplemental Environmental Impact Report File No(s).: PPA24-0139, PGPA24-004, PSPA24-004, PDEV24-017, PMTT24-008, PDA25-003
environmental effects or a substantial increase in the severity of previously identified significant effects.
Substantial changes have not occurred with respect to the circumstances under which the project was undertaken, that would require major revisions to the Certified SEIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects. In addition, all applicable adopted mitigation measures are a condition of Project approval and are incorporated herein by reference. This Addendum provides an analysis of the Project and verification that the Project will not cause environmental impacts such that any of the circumstances identified in State CEQA Guidelines Section 15162 are present.
3) Required Finding. No new information has been provided that would indicate that the proposed project would result in one or more significant effects not discussed in the previous EIR.
No new information that was not known and could not have been known with the exercise of reasonable diligence at the time SEIR was certified shows that the proposed Project would result in any new significant effects not previously discussed in the Certified SEIR, that significant effects previously examined will be substantially more severe than shown in the previous EIR, that mitigation measures or alternatives previously found not to be feasible would in fact be feasible and would substantially reduce one or more significant effects on the environment, or that mitigation measures or alternatives that are considerably different from those analyzed in the previous EIR would substantially reduce one or more significant effects on the environment. The Certified SEIR assumed buildout of the site. No proposed changes or revisions to the Certified SEIR are required. In addition, all applicable previously adopted mitigation measures are a condition of Project approval and are incorporated herein by reference. This Addendum provides an analysis of the 767
Addendum to The Ontario Plan 2050 Supplemental Environmental Impact Report File No(s).: PPA24-0139, PGPA24-004, PSPA24-004, PDEV24-017, PMTT24-008, PDA25-003
Project and verification that the Project will not cause environmental impacts such that any of the circumstances identified in State CEQA Guidelines Section 15162 are present.
13.Conclusion: The Certified SEIR, as certified by City Council on August 16, 2022, was prepared as a Program EIR in accordance with CEQA, the State CEQA Guidelines, and the City’s Rules for the Implementation of CEQA and in accordance with Section 15121(a) of the State CEQA Guidelines (California Code of Regulations, Title 14, Division 6, Chapter 3). The Certified SEIR considered the direct physical changes and reasonably foreseeable indirect physical changes in the environment that would be caused by TOP 2050. Consequently, the Certified SEIR focused on impacts from changes to land use associated with buildout of the City’s land use plan, and impacts from the resulting population and employment growth in the City. The proposed Project coordinates with the existing uses of the properties and uses within the surrounding areas.
Accordingly, and based on the findings and information contained in the Certified SEIR, the analysis in this document, and CEQA statute and State CEQA Guidelines, including Sections 15164 and 15162, the Project will not result in any new, increased or substantially different impacts, other than those previously considered and addressed in the Certified SEIR. 768
Addendum to The Ontario Plan 2050 Supplemental Environmental Impact Report File No(s).: PPA24-0139, PGPA24-004, PSPA24-004, PDEV24-017, PMTT24-008, PDA25-003
14.Surrounding Land Uses:
Existing Land Use
General Plan
Designation Zoning Designation Specific Plan Land Use
Site: Vacant, graded land Public School (PS) SP, Specific Plan School North: Vacant, graded land Low Density
Residential (LDR) SP, Specific Plan Single Family Detached/Park South: Single Family
Residential
Low Density
Residential (LDR) SP, Specific Plan Single Family Detached East:
Vacant, graded
land/ Attached
Residential
Medium Density/Low
Density Residential
(MDR/LDR)
SP, Specific Plan Single Family
Detached
West:
Vacant, graded
land/Single Family
Residential
Low Density
Residential (LDR) SP, Specific Plan Single Family Detached
15.Other public agencies whose approval is anticipated include (e.g., permits, financing approval or participation agreement):
• Santa Ana Regional Water Quality Control Board (Issuance of a National Pollutant Discharge Elimination System Permit; Issuance of a Construction General Permit);
• State Water Resources Control Board (Stormwater Pollution Prevention Plan);
• South Coast Air Quality Management District (Issuance of Air Quality permits to construct and operation, if necessary)
16.Have California Native American tribes traditionally and culturally affiliated with the project area requested consultation pursuant to Public Resources Code section 21080.3.1?
☒Yes ☐ No
If “yes”, has consultation begun? ☐ Yes ☐ No ☒ Completed 769
Addendum to The Ontario Plan 2050 Supplemental Environmental Impact Report File No(s).: PPA24-0139, PGPA24-004, PSPA24-004, PDEV24-017, PMTT24-008, PDA25-003
ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED
The environmental factors checked below would be potentially affected by this project, involving at least one impact that is a "Potentially Significant Impact" as indicated by the checklist on the following pages.
☐ Aesthetics ☐ Agriculture/Forestry
Resources
☐ Air Quality
☐ Biological Resources ☐ Cultural Resources ☐ Geology / Soils ☐ Greenhouse Gas
Emissions
☐ Hazards & Hazardous
Materials
☐ Hydrology/Water
Quality
☐ Land Use / Planning ☐ Mineral Resources ☐ Noise
☐ Population / Housing ☐ Public Services ☐ Recreation
☐ Transportation ☐ Utilities / Service
Systems
☐ Mandatory Findings
of Significance
☐ Tribal Cultural
Resources
☐ Wildfire ☐ Energy
DETERMINATION (To be completed by the Lead Agency)
On the basis of this initial evaluation, I find that the proposed project will not require any major revisions of the previously certified SEIR due to the involvement of any new significant environmental effects or a substantial increase in the severity of previously identified significant effects, that the proposed Project does not trigger any of the conditions set forth in State CEQA Guidelines section 15162, and that an addendum to the previously certified SEIR is appropriate pursuant to State CEQA Guidelines section 15164.
Signature: Date: Click to enter date
Printed Name: Robert Morales For: City of Ontario
770
Addendum to The Ontario Plan 2050 Supplemental Environmental Impact Report File No(s).: PPA24-0139, PGPA24-004, PSPA24-004, PDEV24-017, PMTT24-008, PDA25-003
EVALUATION OF ENVIRONMENTAL IMPACTS
Issues
New
Significant
Impact or
Substantial
Increase in
Severity of
Previously
Identified
Significant
impact
Substantial
Increase in
Severity of
Previously
Identified
Significant
impact
Changed
Circumstances or New
Info
requiring a
subsequent
EIR
No New
Significant
Impact or
Substantial
Increase in
Severity of
Impacts
Previously
Analyzed
in TOP 2050
SEIR
1. AESTHETICS. Except as provided in Public
Resources Code section 21099, would the
project:
a) Have a substantial adverse effect on a
scenic vista?
☐ ☐ ☐ ☒
b) Substantially damage scenic resources,
including, but not limited to, trees, rock
outcroppings, and historic buildings within
a state scenic highway?
☐ ☐ ☐ ☒
c) In non-urbanized areas, substantially
degrade the existing visual character or
quality of public views of the site and its
surroundings? (Public views are those that
are experienced from publicly accessible
vantage point). If the project is in an
urbanized area, would the project conflict
with applicable zoning and other
regulations governing scenic quality?)
☐ ☐ ☐ ☒
d) Create a new source of substantial light or
glare which would adversely affect day or
nighttime views in the area?
☐ ☐ ☐ ☒
2. AGRICULTURE AND FOREST RESOURCES. In
determining whether impacts to agricultural
resources are significant environmental
effects, lead agencies may refer to the
California Agricultural Land Evaluation and Site
Assessment Model (1997) prepared by the
California Dept. of Conservation as an
optional model to use in assessing impacts on
agriculture and farmland. In determining
whether impacts to forest resources, including
timberland, are significant environmental
effects, lead agencies may refer to
information compiled by the California
Department of Forestry and Fire Protection
regarding the state’s inventory of forest land,
771
Addendum to The Ontario Plan 2050 Supplemental Environmental Impact Report File No(s).: PPA24-0139, PGPA24-004, PSPA24-004, PDEV24-017, PMTT24-008, PDA25-003
Issues
New
Significant
Impact or
Substantial
Increase in
Severity of
Previously
Identified
Significant
impact
Substantial
Increase in
Severity of
Previously
Identified
Significant
impact
Changed
Circumstances or New
Info
requiring a
subsequent
EIR
No New
Significant
Impact or
Substantial
Increase in
Severity of
Impacts
Previously
Analyzed
in TOP 2050
SEIR
including the Forest and Range Assessment
Project and the Forest Legacy Assessment
project; and forest carbon measurement
methodology provided in Forest protocols
adopted by the California Air Resources
Board. Would the project:
a) Convert Prime Farmland, Unique
Farmland, or Farmland of Statewide
Importance (Farmland), as shown on the
maps prepared pursuant to the Farmland
Mapping and Monitoring Program of the
California Resources Agency, to nonagricultural use?
☐ ☐ ☐ ☒
b) Conflict with existing zoning for agricultural
use, or a Williamson Act contract?
☐ ☐ ☐ ☒
c) Conflict with existing zoning for, or cause
rezoning of, forest land (as defined in
Public Resources Code section 12220(g)),
timberland (as defined by Public
Resources Code section 4526), or
timberland zoned Timberland Production
(as defined by Government Code section
51104(g))?
☐ ☐ ☐ ☒
d) Result in the loss of forest land or
conversion of forest land to non-forest use?
☐ ☐ ☐ ☒
e) Involve other changes in the existing
environment which, due to their location
or nature, could result in conversion of
Farmland, to non-agricultural use or
conversion of forest land to non-forest use?
☐ ☐ ☐ ☒
3. AIR QUALITY. Where available, the significance
criteria established by the applicable air
quality management district or air pollution
control district may be relied upon to make the
following determinations. Would the project:
a) Conflict with or obstruct implementation of
the applicable air quality plan?
☐ ☐ ☐ ☒
772
Addendum to The Ontario Plan 2050 Supplemental Environmental Impact Report File No(s).: PPA24-0139, PGPA24-004, PSPA24-004, PDEV24-017, PMTT24-008, PDA25-003
Issues
New
Significant
Impact or
Substantial
Increase in
Severity of
Previously
Identified
Significant
impact
Substantial
Increase in
Severity of
Previously
Identified
Significant
impact
Changed
Circumstances or New
Info
requiring a
subsequent
EIR
No New
Significant
Impact or
Substantial
Increase in
Severity of
Impacts
Previously
Analyzed
in TOP 2050
SEIR
b) Result in a cumulatively considerable net
increase of any criteria pollutant for which
the project region is non-attainment under
an applicable federal or state ambient air
quality standard?
☐ ☐ ☐ ☒
c) Expose sensitive receptors to substantial
pollutant concentrations?
☐ ☐ ☐ ☒
d) Result in other emissions (such as those
leading to odors) adversely affecting a
substantial number of people?
☐ ☐ ☐ ☒
4. BIOLOGICAL RESOURCES. Would the project:
a) Have a substantial adverse effect, either
directly or through habitat modifications,
on any species identified as a candidate,
sensitive, or special status species in local
or regional plans, policies, or regulations, or
by the California Department of Fish and
Game or U.S. Fish and Wildlife Service?
☐ ☐ ☐ ☒
b) Have a substantial adverse effect on any
riparian habitat or other sensitive natural
community identified in local or regional
plans, policies, regulations or by the
California Department of Fish and Game
or U.S. Fish and Wildlife Service?
☐ ☐ ☐ ☒
c) Have a substantial adverse effect on state
or federally protected wetlands (including,
but not limited to, marsh, vernal pool,
coastal, etc.) through direct removal,
filling, hydrological interruption, or other
means?
☐ ☐ ☐ ☒
d) Interfere substantially with the movement
of any native resident or migratory fish or
wildlife species or with established native
resident or migratory wildlife corridors, or
impede the use of native wildlife nursery
sites?
☐ ☐ ☐ ☒
e) Conflict with any local policies or
ordinances protecting biological
☐ ☐ ☐ ☒
773
Addendum to The Ontario Plan 2050 Supplemental Environmental Impact Report File No(s).: PPA24-0139, PGPA24-004, PSPA24-004, PDEV24-017, PMTT24-008, PDA25-003
Issues
New
Significant
Impact or
Substantial
Increase in
Severity of
Previously
Identified
Significant
impact
Substantial
Increase in
Severity of
Previously
Identified
Significant
impact
Changed
Circumstances or New
Info
requiring a
subsequent
EIR
No New
Significant
Impact or
Substantial
Increase in
Severity of
Impacts
Previously
Analyzed
in TOP 2050
SEIR
resources, such as a tree preservation
policy or ordinance?
f) Conflict with the provisions of an adopted
Habitat Conservation Plan, Natural
Community Conservation Plan, or other
approved local, regional, or state habitat
conservation plan?
☐ ☐ ☐ ☒
5. CULTURAL RESOURCES. Would the project:
a) Cause a substantial adverse change in the
significance of a historical resource
pursuant to § 15064.5?
☐ ☐ ☐ ☒
b) Cause a substantial adverse change in the
significance of an archaeological
resource pursuant to § 15064.5?
☐ ☐ ☐ ☒
c) Disturb any human remains, including
those interred outside of dedicated
cemeteries?
☐ ☐ ☐ ☒
6. ENERGY. Would the project:
a) Result in potentially significant
environmental impact due to wasteful,
inefficient, or unnecessary consumption of
energy resources, during project
construction or operation?
☐ ☐ ☐ ☒
b) Conflict with or obstruct a state or local
plan for renewable energy or energy
efficiency?
☐ ☐ ☐ ☒
7. GEOLOGY AND SOILS. Would the project:
a) Directly or indirectly cause potential
substantial adverse effects, including the
risk of loss, injury or death involving:
i) Rupture of a known earthquake fault,
as delineated on the most recent
Alquist-Priolo Earthquake Fault Zoning
Map issued by the State Geologist for
the area or based on other substantial
evidence of a known fault? Refer to
☐ ☐ ☐ ☒
774
Addendum to The Ontario Plan 2050 Supplemental Environmental Impact Report File No(s).: PPA24-0139, PGPA24-004, PSPA24-004, PDEV24-017, PMTT24-008, PDA25-003
Issues
New
Significant
Impact or
Substantial
Increase in
Severity of
Previously
Identified
Significant
impact
Substantial
Increase in
Severity of
Previously
Identified
Significant
impact
Changed
Circumstances or New
Info
requiring a
subsequent
EIR
No New
Significant
Impact or
Substantial
Increase in
Severity of
Impacts
Previously
Analyzed
in TOP 2050
SEIR
Division of Mines and Geology Special
Publication 42.
ii) Strong seismic ground shaking? ☐ ☐ ☐ ☒
iii) Seismic-related ground failure,
including liquefaction?
☐ ☐ ☐ ☒
iv) Landslides? ☐ ☐ ☐ ☒
b) Result in substantial soil erosion or the loss
of topsoil?
☐ ☐ ☐ ☒
c) Be located on a geologic unit or soil that is
unstable, or that would become unstable
as a result of the project, and potentially
result in on- or off-site landslide, lateral
spreading, subsidence, liquefaction or
collapse?
☐ ☐ ☐ ☒
d) Be located on expansive soil, as defined in
Table 18-1-B of the Uniform Building Code,
creating substantial direct or indirect risks
to life or property?
☐ ☐ ☐ ☒
e) Have soils incapable of adequately
supporting the use of septic tanks or
alternative wastewater disposal systems
where sewers are not available for the
disposal of wastewater?
☐ ☐ ☐ ☒
f) Directly or indirectly destroy a unique
paleontological resource or site or unique
geologic feature?
☐ ☐ ☐ ☒
8. GREENHOUSE GAS EMISSIONS. Would the
project:
a) Generate greenhouse gas emissions,
either directly or indirectly, that may have
a significant impact on the environment?
☐ ☐ ☐ ☒
b) Conflict with an applicable plan, policy or
regulation adopted for the purpose of
reducing the emission of greenhouse
gases?
☐ ☐ ☐ ☒
775
Addendum to The Ontario Plan 2050 Supplemental Environmental Impact Report File No(s).: PPA24-0139, PGPA24-004, PSPA24-004, PDEV24-017, PMTT24-008, PDA25-003
Issues
New
Significant
Impact or
Substantial
Increase in
Severity of
Previously
Identified
Significant
impact
Substantial
Increase in
Severity of
Previously
Identified
Significant
impact
Changed
Circumstances or New
Info
requiring a
subsequent
EIR
No New
Significant
Impact or
Substantial
Increase in
Severity of
Impacts
Previously
Analyzed
in TOP 2050
SEIR
9. HAZARDS AND HAZARDOUS MATERIALS. Would
the project:
a) Create a significant hazard to the public or
the environment through the routine
transport, use, or disposal of hazardous
materials?
☐ ☐ ☐ ☒
b) Create a significant hazard to the public or
the environment through reasonably
foreseeable upset and accident
conditions involving the release of
hazardous materials into the environment?
☐ ☐ ☐ ☒
c) Emit hazardous emissions or handle
hazardous or acutely hazardous materials,
substances, or waste within one-quarter
mile of an existing or proposed school?
☐ ☐ ☐ ☒
d) Be located on a site which is included on a
list of hazardous materials sites compiled
pursuant to Government Code section
65962.5 and, as a result, would it create a
significant hazard to the public or the
environment?
☐ ☐ ☐ ☒
e) For a project located within an airport land
use plan or, where such a plan has not
been adopted, within two miles of a public
airport or public use airport, would the
project result in a safety hazard or
excessive noise for people residing or
working in the project area?
☐ ☐ ☐ ☒
f) Impair implementation of or physically
interfere with an adopted emergency
response plan or emergency evacuation
plan?
☐ ☐ ☐ ☒
g) Expose people or structures, either directly
or indirectly, to a significant risk of loss,
injury or death involving wildland fires?
☐ ☐ ☐ ☒
10. HYDROLOGY AND WATER QUALITY. Would the
project:
776
Addendum to The Ontario Plan 2050 Supplemental Environmental Impact Report File No(s).: PPA24-0139, PGPA24-004, PSPA24-004, PDEV24-017, PMTT24-008, PDA25-003
Issues
New
Significant
Impact or
Substantial
Increase in
Severity of
Previously
Identified
Significant
impact
Substantial
Increase in
Severity of
Previously
Identified
Significant
impact
Changed
Circumstances or New
Info
requiring a
subsequent
EIR
No New
Significant
Impact or
Substantial
Increase in
Severity of
Impacts
Previously
Analyzed
in TOP 2050
SEIR
a) Violate any water quality standards or
waste discharge requirements or otherwise
substantially degrade surface or ground
water quality?
☐ ☐ ☐ ☒
b) Substantially decrease groundwater
supplies or interfere substantially with
groundwater recharge such that the
project may impede sustainable
groundwater management of the basin?
☐ ☐ ☐ ☒
c) Substantially alter the existing drainage
pattern of the site or area, including
through the alteration of the course of a
stream or river or through the addition of
impervious surfaces, in a manner which
would:
i) Result in substantial erosion or siltation
on- or off-site;
☐ ☐ ☐ ☒
ii) Substantially increase the rate or
amount of surface runoff in a manner
which would result in flooding on- or offsite;
☐ ☐ ☐ ☒
iii) Create or contribute runoff water
which would exceed the capacity of
existing or planned stormwater
drainage systems or provide substantial
additional sources of polluted runoff; or
☐ ☐ ☐ ☒
d) Impede or redirect flood flows? ☐ ☐ ☐ ☒
e) In flood hazard, tsunami, or seiche zones,
risk release of pollutants due to project
inundation?
☐ ☐ ☐ ☒
f) Conflict with or obstruct implementation of
a water quality control plan or sustainable
groundwater management plan?
☐ ☐ ☐ ☒
11. LAND USE AND PLANNING. Would the project:
a) Physically divide an established
community?
☐ ☐ ☐ ☒
777
Addendum to The Ontario Plan 2050 Supplemental Environmental Impact Report File No(s).: PPA24-0139, PGPA24-004, PSPA24-004, PDEV24-017, PMTT24-008, PDA25-003
Issues
New
Significant
Impact or
Substantial
Increase in
Severity of
Previously
Identified
Significant
impact
Substantial
Increase in
Severity of
Previously
Identified
Significant
impact
Changed
Circumstances or New
Info
requiring a
subsequent
EIR
No New
Significant
Impact or
Substantial
Increase in
Severity of
Impacts
Previously
Analyzed
in TOP 2050
SEIR
b) Cause a significant environmental impact
due to a conflict with any land use plan,
policy, or regulation adopted for the
purpose of avoiding or mitigating an
environmental effect?
☐ ☐ ☐ ☒
12. MINERAL RESOURCES. Would the project:
a) Result in the loss of availability of a known
mineral resource that would be of value to
the region and the residents of the state?
☐ ☐ ☐ ☒
b) Result in the loss of availability of a locally
important mineral resource recovery site
delineated on a local general plan,
specific plan or other land use plan?
☐ ☐ ☐ ☒
13. NOISE. Would the project result in:
a) Generation of a substantial temporary or
permanent increase in ambient noise
levels in the vicinity of the project in excess
of standards established in the local
general plan or noise ordinance, or
applicable standards of other agencies?
☐ ☐ ☐ ☒
b) Generation of excessive groundborne
vibration or groundborne noise levels?
☐ ☐ ☐ ☒
c) For a project located within the vicinity of
a private airstrip or an airport land use plan
or, where such a plan has not been
adopted, within two miles of a public
airport or public use airport, would the
project expose people residing or working
in the project area to excessive noise
levels?
☐ ☐ ☐ ☒
14. POPULATION AND HOUSING. Would the
project:
a) Induce substantial unplanned population
growth in an area, either directly (for
example, by proposing new homes and
businesses) or indirectly (for example,
through extension of road or other
☐ ☐ ☐ ☒
778
Addendum to The Ontario Plan 2050 Supplemental Environmental Impact Report File No(s).: PPA24-0139, PGPA24-004, PSPA24-004, PDEV24-017, PMTT24-008, PDA25-003
Issues
New
Significant
Impact or
Substantial
Increase in
Severity of
Previously
Identified
Significant
impact
Substantial
Increase in
Severity of
Previously
Identified
Significant
impact
Changed
Circumstances or New
Info
requiring a
subsequent
EIR
No New
Significant
Impact or
Substantial
Increase in
Severity of
Impacts
Previously
Analyzed
in TOP 2050
SEIR
infrastructure)?
b) Displace substantial numbers of existing
people or housing, necessitating the
construction of replacement housing
elsewhere?
☐ ☐ ☐ ☒
15. PUBLIC SERVICES. Would the project:
a) Result in substantial adverse physical
impacts associated with the provision of
new or physically altered governmental
facilities, need for new or physically altered
governmental facilities, the construction of
which could cause significant
environmental impacts, in order to
maintain acceptable service ratios,
response times or other performance
objectives for any of the public services:
i) Fire protection? ☐ ☐ ☐ ☒
ii) Police protection? ☐ ☐ ☐ ☒
iii) Schools? ☐ ☐ ☐ ☒
iv) Parks? ☐ ☐ ☐ ☒
v) Other public facilities? ☐ ☐ ☐ ☒
16. RECREATION.
a) Would the project increase the use of
existing neighborhood and regional parks
or other recreational facilities such that
substantial physical deterioration of the
facility would occur or be accelerated?
☐ ☐ ☐ ☒
b) Does the project include recreational
facilities or require the construction or
expansion of recreational facilities which
have an adverse physical effect on the
environment?
☐ ☐ ☐ ☒
17. TRANSPORTATION. Would the project:
a) Conflict with a program plan, ordinance or ☐ ☐ ☐ ☒
779
Addendum to The Ontario Plan 2050 Supplemental Environmental Impact Report File No(s).: PPA24-0139, PGPA24-004, PSPA24-004, PDEV24-017, PMTT24-008, PDA25-003
Issues
New
Significant
Impact or
Substantial
Increase in
Severity of
Previously
Identified
Significant
impact
Substantial
Increase in
Severity of
Previously
Identified
Significant
impact
Changed
Circumstances or New
Info
requiring a
subsequent
EIR
No New
Significant
Impact or
Substantial
Increase in
Severity of
Impacts
Previously
Analyzed
in TOP 2050
SEIR
policy addressing the circulation system,
including transit, roadway, bicycle and
pedestrian facilities?
b) Conflict or be inconsistent with CEQA
Guidelines section 15064.3, subdivision (b)?
☐ ☐ ☐ ☒
c) Substantially increase hazards due to a
geometric design feature (e.g., sharp
curves or dangerous intersections) or
incompatible uses (e.g., farm equipment)?
☐ ☐ ☐ ☒
d) Result in inadequate emergency access? ☐ ☐ ☐ ☒
18. TRIBAL CULTURAL RESOURCES. Would the
project cause a substantial adverse change in
the significance of a tribal cultural resource,
defined in Public Resources Code section
21074 as either a site, feature, place, cultural
landscape that is geographically defined in
terms of the size and scope of the landscape,
sacred place, or object with cultural value to
a California Native American tribe, and that is:
a) Listed or eligible for listing in the California
Register of Historical Resources, or in a
local register of historical resources as
defined in Public Resources Code section
5020.1(k), or
☐ ☐ ☐ ☒
b) A resource determined by the lead
agency, in its discretion and supported by
substantial evidence, to be significant
pursuant to criteria set forth in subdivision
(c) of Public Resources Code section
5024.1. In applying the criteria set forth in
subdivision (c) of Public Resources Code
section 5024.1, the lead agency shall
consider the significance of the resource
to a California Native American tribe.
☐ ☐ ☐ ☒
19. UTILITIES AND SERVICE SYSTEMS. Would the
project:
a) Require or result in the relocation or ☐ ☐ ☐ ☒
780
Addendum to The Ontario Plan 2050 Supplemental Environmental Impact Report File No(s).: PPA24-0139, PGPA24-004, PSPA24-004, PDEV24-017, PMTT24-008, PDA25-003
Issues
New
Significant
Impact or
Substantial
Increase in
Severity of
Previously
Identified
Significant
impact
Substantial
Increase in
Severity of
Previously
Identified
Significant
impact
Changed
Circumstances or New
Info
requiring a
subsequent
EIR
No New
Significant
Impact or
Substantial
Increase in
Severity of
Impacts
Previously
Analyzed
in TOP 2050
SEIR
construction of new or expanded water,
wastewater treatment or storm water
drainage, electric power, natural gas, or
telecommunications facilities, the
construction or relocation of which could
cause significant environmental effects?
b) Have sufficient water supplies available to
serve the project and reasonably
foreseeable future development during
normal, dry and multiple dry years?
☐ ☐ ☐ ☒
c) Result in a determination by the
wastewater treatment provider which
serves or may serve the project that it has
adequate capacity to serve the project's
projected demand in addition to the
provider's existing commitments?
☐ ☐ ☐ ☒
d) Generate solid waste in excess of State or
local standards, or in excess of the
capacity of local infrastructure, or
otherwise impair the attainment of solid
waste reduction goals?
☐ ☐ ☐ ☒
e) Comply with federal, state, and local
management and reduction statutes and
regulations related to solid waste?
☐ ☐ ☐ ☒
20. WILDFIRE. If located in or near state
responsibility areas or lands classified as very
high fire hazard severity zones, would the
project:
a) Substantially impair an adopted
emergency response plan or emergency
evacuation plan?
☐ ☐ ☐ ☒
b) Due to slope, prevailing winds, and other
factors, exacerbate wildfire risks, and
thereby expose project occupants to,
pollutant concentrations from a wildfire or
the uncontrolled spread of a wildfire?
☐ ☐ ☐ ☒
c) Require the installation or maintenance of ☐ ☐ ☐ ☒
781
Addendum to The Ontario Plan 2050 Supplemental Environmental Impact Report File No(s).: PPA24-0139, PGPA24-004, PSPA24-004, PDEV24-017, PMTT24-008, PDA25-003
Issues
New
Significant
Impact or
Substantial
Increase in
Severity of
Previously
Identified
Significant
impact
Substantial
Increase in
Severity of
Previously
Identified
Significant
impact
Changed
Circumstances or New
Info
requiring a
subsequent
EIR
No New
Significant
Impact or
Substantial
Increase in
Severity of
Impacts
Previously
Analyzed
in TOP 2050
SEIR
associated infrastructure (such as roads,
fuel breaks, emergency water sources,
power lines or other utilities) that may
exacerbate fire risk or that may result in
temporary or ongoing impacts to the
environment?
d) Expose people or structures to significant
risks, including downslope or downstream
flooding or landslides, as a result of runoff,
post-fire slope instability, or drainage
changes?
☐ ☐ ☐ ☒
21. MANDATORY FINDINGS OF SIGNIFICANCE.
(State CEQA Guidelines section 15065(a).)
a) Does the project have the potential to
substantially degrade the quality of the
environment, substantially reduce the
habitat of a fish or wildlife species, cause a
fish or wildlife population to drop below
self-sustaining levels, threaten to eliminate
a plant or animal community, substantially
reduce the number or restrict the range of
a rare or endangered plant or animal or
eliminate important examples of the major
periods of California history or prehistory?
☐ ☐ ☐ ☒
b) Does the project have impacts that are
individually limited, but cumulatively
considerable? (“Cumulatively
considerable” means that the incremental
effects of a project are considerable when
viewed in connection with the effects of
past projects, the effects of other current
project, and the effects of probable future
projects.)
☐ ☐ ☐ ☒
c) Does the project have environmental
effects which will cause substantial
adverse effects on human beings, either
directly or indirectly?
☐ ☐ ☐ ☒
Note: Authority cited: Public Resources Code sections 21083, 21083.05, 21083.09.
Reference: Gov. Code section 65088.4; Public Resources Code sections 21073, 21074, 21080(c), 21080.1, 21080.3, 782
Addendum to The Ontario Plan 2050 Supplemental Environmental Impact Report File No(s).: PPA24-0139, PGPA24-004, PSPA24-004, PDEV24-017, PMTT24-008, PDA25-003
Issues
New
Significant
Impact or
Substantial
Increase in
Severity of
Previously
Identified
Significant
impact
Substantial
Increase in
Severity of
Previously
Identified
Significant
impact
Changed
Circumstances or New
Info
requiring a
subsequent
EIR
No New
Significant
Impact or
Substantial
Increase in
Severity of
Impacts
Previously
Analyzed
in TOP 2050
SEIR
21080.3.1, 21080.3.2, 21082.3, 21083, 21083.3, 21083.5, 21084.2, 21084.3, 21093, 21094, 21095 and 21151; Sundstrom v.
County of Mendocino (1988) 202 Cal.App.3d 296; Leonoff v. Monterey County Board of Supervisors (1990) 222 Cal.App.3d 1337; Eureka Citizens for Responsible Govt. v. City of Eureka (2007) 147 Cal.App.4th 357; Protect the Historic Amador Waterways v. Amador Water Agency (2004) 116 Cal.App.4th 1099, 1109; San Franciscans Upholding the Downtown Plan v. City and County of San Francisco (2002) 102 Cal.App.4th 656. 783
Addendum to The Ontario Plan 2050 Supplemental Environmental Impact Report File No(s).: PPA24-0139, PGPA24-004, PSPA24-004, PDEV24-017, PMTT24-008, PDA25-003
EXPLANATION OF ISSUES
1. AESTHETICS. Would the project:
a. Have a substantial adverse effect on a scenic vista? Summary of Certified SEIR Finding: The Certified SEIR concluded that increased development under TOP 2050 would occur within the City limits and already urbanized areas of the City. The scale and design of the City under TOP 2050 would not deter views of the San Gabriel Mountains. Therefore, impacts to scenic vistas would be less than significant and would not result in new or a substantial increase in magnitude of impacts compared to the Certified SEIR (Certified SEIR, pp. 5.1-4 – 5.1-10).
Project Impacts: TOP 2050 does not identify scenic vistas within the City. However, the Policy Plan (Policy CD-1.5) requires all major north-south streets be designed and developed to feature views of the San Gabriel Mountains. The Project site is not located along any major north-south streets, as identified in Figure M-01, Roadway Classifications, of the City’s Mobility Element. The Project would not result in any new, increased or substantially different impacts, other than those previously considered and addressed in the Certified SEIR.
Mitigation:
Certified SEIR Measure(s) Project Applicability
None. -
b. Substantially damage scenic resources, including, but not limited to, trees, rock outcroppings and historic buildings within a state scenic highway? Summary of Certified SEIR Finding: The Certified SEIR concluded that there are no State Scenic highways through or in the vicinity of the City. The closest designated State scenic highway is a portion of State Route 142 in Chino Hills, approximately five miles west of the Ontario city limit. Therefore, no impacts to scenic highways would occur and TOP 2050 would not result in new or a substantial increase in 784
Addendum to The Ontario Plan 2050 Supplemental Environmental Impact Report File No(s).: PPA24-0139, PGPA24-004, PSPA24-004, PDEV24-017, PMTT24-008, PDA25-003
magnitude of impacts compared to the Certified SEIR (Certified SEIR, pp. 5.1-4 –
5.1-10).
Project Impacts: The Project is not located near a scenic highway, nor does the site contain any scenic resources. The Project would not substantially damage scenic resources, including, but not limited to, trees, rock outcroppings and historic buildings within a state scenic highway. The Project would not result in any new, increased or substantially different impacts, other than those previously considered and addressed in the Certified SEIR.
Mitigation:
Certified SEIR Measure(s) Project Applicability
None. -
c. In non-urbanized areas, substantially degrade the existing visual character or quality of public views of the site and its surroundings? (Public views are those that are experienced from publicly accessible vantage point). If the project is in an urbanized area, would the project conflict with applicable zoning and other regulations governing scenic quality?
Summary of Certified SEIR Finding: The Certified SEIR recognizes that buildout of the City would alter the visual character of the City. The Certified SEIR concludes that compliance with the City Municipal Code and applicable TOP 2050 Policies would ensure that potential aesthetics impacts of development anticipated under TOP 2050 would be less than significant (Certified SEIR, pp. 5.1-4 – 5.1-10).
Project Impacts: Final designs of the Project facilities including, but not limited to, the proposed buildings, landscape/hardscape features, and lighting configurations would be required to conform to the Esperanza Specific Plan Development Regulations and Design Guidelines, and applicable provisions of the City Municipal Code. Final designs of all uses would be subject to City review and approval. As such, the Project would not conflict with applicable zoning or other regulations governing scenic quality. Impacts of the Project in these regards would be less than significant. On this basis, when compared to the Certified SEIR 785
Addendum to The Ontario Plan 2050 Supplemental Environmental Impact Report File No(s).: PPA24-0139, PGPA24-004, PSPA24-004, PDEV24-017, PMTT24-008, PDA25-003
findings, no new or substantially increased aesthetic impacts would result from the Project.
Mitigation:
Certified SEIR Measure(s) Project Applicability
None. -
d. Create a new source of substantial light or glare that would adversely affect day or nighttime views in the area?
Summary of Certified SEIR Finding: The Certified SEIR concluded that TOP 2050 would result in additional sources of light and glare; however, adherence to the design standards of the City of Ontario Development Code would ensure that light and glare from new developments would be minimized and that significant impacts would not occur. Therefore, impacts to light and glare would be less than significant, and TOP 2050 would not result in new or a substantial increase in magnitude of impacts compared to the Certified SEIR (Certified SEIR, pp. 5.1-4 –
5.1-10).
Project Impacts: The Project site is surrounded by existing and/or proposed urban uses. Street lighting is currently located along the entire periphery of the site. New lighting will be introduced to the site as part of the Project. Pursuant to the requirements of the City’s Municipal Code, Project on-site lighting would be shielded, diffused or indirect, to avoid glare to pedestrians or motorists. In addition, lighting fixtures will be selected and located to confine the area of illumination to within the Project site and minimize light spillage.
Furthermore, consistent with the findings of the Certified SEIR, site lighting plans will be subject to review by the Planning Department and Police Department prior to issuance of building permits (pursuant to the City’s Building Security Ordinance).
Therefore, implementation of the Project would not result in a significant source of light or glare that would adversely affect daytime or nighttime views. The Project would not result in any new, increased or substantially different impacts, beyond those previously considered and addressed in the Certified SEIR. 786
Addendum to The Ontario Plan 2050 Supplemental Environmental Impact Report File No(s).: PPA24-0139, PGPA24-004, PSPA24-004, PDEV24-017, PMTT24-008, PDA25-003
Mitigation:
Certified SEIR Measure(s) Project Applicability
None. -
2. AGRICULTURE AND FOREST RESOURCES. In determining whether impacts to agricultural resources are significant environmental effects, lead agencies may refer to the California Agricultural Land Evaluation and Site Assessment Model prepared by the California Department of Conservation as an optional model to use in assessing impacts on agriculture and farmland. In determining whether impacts to forest resources, including timberland, are significant environmental effects, lead agencies may refer to information compiled by the California Department of Forestry and Fire Protection regarding the state’s inventory of forest land, including the Forest and Range Assessment Project and the Forest Legacy Assessment project; and forest carbon measurement methodology provided in Forest Protocols adopted by the California Air Resources Board.
Would the project:
a. Convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland), as shown on the maps prepared pursuant to the Farmland Mapping and Monitoring Program of the California Resources Agency, to non-agricultural use?
Summary of Certified SEIR Finding: Under TOP 2050, the City of Ontario no longer has land designated for agricultural uses. Because TOP 2050 is the baseline for the Certified SEIR, TOP 2050 would not result in the conversion of Prime Farmland, Unique Farmland, and Farmland of Statewide Importance to nonagricultural uses.
TOP 2050 would therefore have no impact on land zoned for agricultural purposes (Certified SEIR, p. 5.2-12).
Project Impacts: The Project site is not designated as Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland). According to the California Department of Conservation, the Project site is designated as “Other Land.” This designation is used for properties that are not included in any other mapping category. Vacant and non-agricultural land surrounded on all sides by 787
Addendum to The Ontario Plan 2050 Supplemental Environmental Impact Report File No(s).: PPA24-0139, PGPA24-004, PSPA24-004, PDEV24-017, PMTT24-008, PDA25-003
urban development is commonly mapped as Other Land (DOC, 2022). As such, the Project would not result in any new, increased or substantially different impacts, other than those previously considered and addressed in the Certified SEIR.
Mitigation:
Certified SEIR Measure(s) Project Applicability
None. -
b. Conflict with existing zoning for agricultural use, or a Williamson Act contract?
Summary of Certified SEIR Finding: The Certified SEIR concluded that implementation of the Land Use Plan would not adversely affect agriculturally zoned properties (Certified SEIR, p. 5.2-12).
Implementation of TOP 2050 would affect all active Williamson Act contracts within the City. The Certified SEIR concluded, however, that impacts to Williamson Act contract properties under TOP 2050 would not be greater than, or different than, would result from TOP 2009. On this basis, the Certified SEIR concluded that TOP 2050 impacts to Williamson Act Contract properties would be less than significant (Certified SEIR, p. 5.2-13).
Project Impacts: The Project site is not zoned for agricultural use. The Project site is zoned Specific Plan and would involve a Specific Plan Amendment to change the land use designation from School to MDR 25. The Project’s proposed Specific Plan Amendment would not result in a loss of land zoned for agricultural use.
Furthermore, there is no Williamson Act contract in effect on the Project site.
Therefore, no impacts to agricultural uses are anticipated, nor will there be any conflict with existing Williamson Act contracts. The Project would not result in any new, increased or substantially different impacts, other than those previously considered and addressed in the Certified SEIR.
788
Addendum to The Ontario Plan 2050 Supplemental Environmental Impact Report File No(s).: PPA24-0139, PGPA24-004, PSPA24-004, PDEV24-017, PMTT24-008, PDA25-003
Mitigation:
Certified SEIR Measure(s) Project Applicability
None. -
c. Conflict with existing zoning for, or cause rezoning of, forest land (as defined in Public Resources Code section 12220(g)), timberland (as defined by Public Resources Code section 4526), or timberland zoned Timberland Production (as defined by Government Code section 51104(g)? Summary of Certified SEIR Finding: There are no City land uses zoned for forest land, timberland, or timberland zoned Timberland Production. There are no properties in the City considered to be forestland. As such, implementation of TOP 2050 would have no impact on land uses zoned for forest land, timberland, or timberland zoned Timberland Production; nor would TOP 2050 result in the loss or conversion of timberland or forest land to non-forest uses (Certified SEIR, p. 5.2- 13).
Project Impacts: The Project site is not zoned for forest land or timberland. As concluded in the Certified SEIR, the City’s Zoning Map does not designate any parcels of land in the Project area for forest land, timberland, or timberland zoned Timberland Production. Therefore, implementation of the Project would not conflict with, or cause the rezoning of, forest land or timberland. The Project would not result in any new, increased or substantially different impacts, other than those previously considered and addressed in the Certified SEIR.
Mitigation:
Certified SEIR Measure(s) Project Applicability
None. -
d. Result in the loss of forest land or conversion of forest land to non-forest use? Summary of Certified SEIR Finding: There are no City land uses zoned for forest land. There are no properties in the City considered to be forest land. As such, 789
Addendum to The Ontario Plan 2050 Supplemental Environmental Impact Report File No(s).: PPA24-0139, PGPA24-004, PSPA24-004, PDEV24-017, PMTT24-008, PDA25-003
implementation of TOP 2050 would have no impact on land uses zoned for forest land; nor would TOP 2050 result in the loss or conversion of forest land to non-forest uses (Certified SEIR, p. 5.2-13).
Project Impacts: There is currently no land in the City of Ontario that qualifies as forest land as defined in Public Resources Code section 12220(g). Neither the Policy Plan nor the City’s Zoning Code provide designations for forest land.
Consequently, the Project would not result in the loss or conversion of forest land.
The Project would not result in any new, increased or substantially different impacts, other than those previously considered and addressed in the Certified SEIR.
Mitigation:
Certified SEIR Measure(s) Project Applicability
None. -
e. Involve other changes in the existing environment, which, due to their location or nature, could individually or cumulatively result in loss of Farmland to non-agricultural use or conversion of forest land to non-forest use?
Summary of Certified SEIR Finding: Under TOP 2050, the City Ontario no longer has land designated for agricultural uses. Because TOP 2050 is the baseline for the Certified SEIR, TOP 2050 would not result in the conversion of Prime Farmland, Unique Farmland, and Farmland of Statewide Importance to nonagricultural uses.
TOP 2050 would therefore have no impact on land zoned for agricultural purposes (Certified SEIR, p. 5.2-12).
Project Impacts: As previously mentioned, the Project site does not include Farmland (defined as Prime Farmland, Unique Farmland, or Farmland of Statewide Importance) or forest land and, therefore, the Project would not result in the conversion of Farmland to non-agricultural use or forest land to non-forest use. The Project would not result in any impacts to agricultural and/or forestry resources. The Project would not result in any new, increased or substantially 790
Addendum to The Ontario Plan 2050 Supplemental Environmental Impact Report File No(s).: PPA24-0139, PGPA24-004, PSPA24-004, PDEV24-017, PMTT24-008, PDA25-003
different impacts, other than those previously considered and addressed in the Certified SEIR.
Mitigation Required:
Certified SEIR Measure(s) Project Applicability
None. -
3. AIR QUALITY. The analysis in this section is based on the following technical analysis:
• Esperanza Specific Plan Amendment Air Quality Assessment (Urban Crossroads, Inc.) March 28, 2025.
This report (Urban Crossroads, 2025a) is provided in its entirety as Appendix C of this Addendum.
a. Conflict with or obstruct implementation of the applicable air quality plan? Summary of Certified SEIR Finding: The Certified EIR evaluated conformance with the South Coast Air Quality Management District (SCAQMD) Air Quality Management Plan (AQMP) based on the following criteria: 1. Whether the project would exceed the assumptions in the AQMP, and 2. Whether the project would result in an increase in the frequency or severity of existing air quality violations, cause, or contribute to new violations, or delay timeline attainment of air quality standards. The Certified SEIR concluded that buildout of TOP 2050 would be consistent with the AQMP under the first criteria. However, air pollutant emissions associated with buildout of TOP 2050 would cumulatively contribute to the nonattainment designations in the South Coast Air Basin (SCAB). Incorporation of Mitigation Measures 3-2 and AQ-1 (see discussion under checklist item b, below) into future development projects for the operation phase would reduce criteria air pollutant emissions associated with buildout of TOP 2050. Additionally, goals and policies in TOP 2050 would promote increased capacity for alternative transportation modes. However, no additional mitigation measures that would reduce impacts below SCAQMD thresholds were identified. Therefore, impacts would remain significant and unavoidable (Certified SEIR, p. 5.3-40). 791
Addendum to The Ontario Plan 2050 Supplemental Environmental Impact Report File No(s).: PPA24-0139, PGPA24-004, PSPA24-004, PDEV24-017, PMTT24-008, PDA25-003
Project Impacts: The Project site is located within the SCAB. Currently, State, and federal air quality standards are exceeded in most parts of the SCAB. In response, the SCAQMD has adopted a series of Air Quality Management Plans (AQMPs) to meet the State and federal ambient air quality standards. AQMPs are regularly updated to more effectively reduce emissions, accommodate growth, and to minimize any negative fiscal impacts of air pollution control on the economy. In December 2022, the SCAQMD released the Final 2022 AQMP. The 2022 AQMP continues to evaluate current integrated strategies and control measures to meet the California Ambient Air Quality Standards, as well as explore new and innovative methods to reach its goals. Current AQMP consistency criteria include:
Consistency Criterion No. 1: The Project will not result in an increase in the frequency or severity of existing air quality violations or cause or contribute to new violations or delay the timely attainment of air quality standards or the interim emissions reductions specified in the AQMP.
Consistency Criterion No. 2: The Project will not exceed the assumptions in the AQMP based on the years of Project build-out phase.
The 2022 AQMP assumed buildout of the Project site consistent with existing General Plan designations. Although a General Plan Amendment would be required to accommodate the Project, operational-source emissions would not exceed the applicable SCAQMD regional thresholds for emissions of any criteria pollutant (see Table 3-2, presented subsequently). Additionally, the Project would be subject to all applicable mitigation and would be developed consistent with TOP 2050 goals and policies.
The City adopted a Statement of Overriding Considerations in regard to pollutant emissions associated with buildout of TOP 2050. The Project would not result in any new, increased or substantially different impacts, other than those previously considered and addressed in the Certified SEIR.
792
Addendum to The Ontario Plan 2050 Supplemental Environmental Impact Report File No(s).: PPA24-0139, PGPA24-004, PSPA24-004, PDEV24-017, PMTT24-008, PDA25-003
Mitigation:
Certified SEIR Measure(s) Project Applicability
None. The Certified SEIR did not
propose specific measures under this
item, but stated that mitigation
measures applied to a development
project’s construction and operational
phases (presented subsequently)
would reduce impacts associated with
consistency with the SCAQMD.
See measures 3-1, 3-2, and AQ-1,
presented subsequently.
b. Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non-attainment under an applicable federal or state ambient air quality standard?
Summary of Certified SEIR Finding: The Certified SEIR concluded that buildout of TOP 2050 would generate short-term and long-term air pollutant emissions exceeding SCAQMD regional significance thresholds for VOC, CO, NOx, PM10, and PM2.5. These exceedances would cumulatively contribute to the SCAB nonattainment designations for O3, PM10 and PM2.5. Even with the implementation of mitigation measures, nonattainment air quality impacts resulting from buildout of TOP 2050 would be significant and unavoidable (Certified SEIR, pp. 5.3-54 – 5.3- 57).
Project Impacts:
Construction
To analyze the emissions associated with construction, regional Projectgenerated emissions were developed and compared to applicable SCAQMD thresholds. Table 3-1 presents the regional emissions that can be expected from Project construction.
793
Addendum to The Ontario Plan 2050 Supplemental Environmental Impact Report File No(s).: PPA24-0139, PGPA24-004, PSPA24-004, PDEV24-017, PMTT24-008, PDA25-003
Table 3-1
Regional Construction Impacts
Source Emissions (lbs/day)
VOC NOX CO SOX PM10 PM2.5
Summer
2026 3.91 34.72 32.28 0.06 23.78 12.01
2027 1.60 11.05 22.06 0.03 2.01 0.73
2028 1.54 10.51 21.48 0.03 1.98 0.69
Winter
2026 3.47 30.11 29.79 0.06 11.93 5.11
2027 1.57 11.12 20.15 0.03 2.01 0.73
2028 1.51 10.54 19.70 0.03 1.98 0.69
2029 29.05 17.78 32.37 0.05 2.70 1.02
Maximum Daily Emissions 29.05 34.72 32.37 0.06 23.78 12.01 SCAQMD Regional Threshold 75 100 550 150 150 55
Threshold Exceeded? NO NO NO NO NO NO
Source: Urban Crossroads, 2025a
As shown above, regional emissions associated with Project construction would not exceed applicable SCAQMD thresholds, and therefore, would not result in a cumulatively considerable net increase of any criteria pollutant beyond that anticipated and evaluated in the Certified SEIR during construction.
Operations
Operational activities associated with the Project would result in emissions of CO, VOCs, NOX, SOX, PM10, and PM2.5. Operational-related emissions are expected from the following primary sources: area source emissions, energy source emissions, and mobile source emissions. The Project-related operational air quality impacts derive primarily from vehicle trips generated by buildout associated with the net increase in residential units.
The SCAQMD has developed regional operational significance thresholds for criteria pollutants, as summarized in Table 3-2. The SCAQMD’s CEQA Air Quality Significance Thresholds (March 2023) indicate that any projects in the SCAB with 794
Addendum to The Ontario Plan 2050 Supplemental Environmental Impact Report File No(s).: PPA24-0139, PGPA24-004, PSPA24-004, PDEV24-017, PMTT24-008, PDA25-003
daily emissions that exceed any of the indicated thresholds should be considered as having an individually and cumulatively significant air quality impact.
Table 3-2
SCAQMD Regional Threshold of Significance
Pollutant Operational Regional Thresholds
NOX 55 lbs/day
VOC 55 lbs/day
PM10 150 lbs/day
PM2.5 55 lbs/day
SOX 150 lbs/day
CO 550 lbs/day
Source: Urban Crossroads, 2025a
Table 3-3 compares the emissions associated with the proposed Project and the approved school use against the SCAQMD thresholds presented above.
Table 3-3
Operational Emissions Comparison
Emissions (lbs/day)
VOC NOX CO SOX PM10 PM2.5
Summer
Proposed Project 8.44 7.52 53.35 0.14 11.69 3.22
Approved School Use 6.21 5.76 55.04 0.13 11.43 2.99
Net Emissions 2.24 1.76 -1.68 0.01 0.26 0.23
Threshold 55 55 550 150 150 55
Threshold Exceeded? No No No No No No
Winter
Proposed Project 7.45 7.74 36.28 0.14 11.68 3.22
Approved School Use 5.48 6.15 42.64 0.13 11.42 2.98
Net Emissions 1.97 1.59 -6.37 0.01 0.26 0.23
Threshold 55 55 550 150 150 55
Threshold Exceeded? No No No No No No
Source: Urban Crossroads, 2025a
As shown above, operational-source emissions would not exceed the applicable SCAQMD regional thresholds for emissions of any criteria pollutant. The Project would not result in any new, increased or substantially different impacts, other than those previously considered and addressed in the Certified SEIR. 795
Addendum to The Ontario Plan 2050 Supplemental Environmental Impact Report File No(s).: PPA24-0139, PGPA24-004, PSPA24-004, PDEV24-017, PMTT24-008, PDA25-003
Mitigation:
Certified SEIR Measure(s) Project Applicability
MM 3-1 Prior to discretionary
approval by the City of Ontario for
development projects subject to
CEQA (California Environmental
Quality Act) review (i.e., nonexempt
projects), project applicants shall
prepare and submit a technical
assessment evaluating potential
project construction-related air quality
impacts to the City of Ontario Planning
Department for review and approval.
The evaluation shall be prepared in
conformance with South Coast Air
Quality Management District (South
Coast AQMD) methodology for
assessing air quality impacts. If
construction-related criteria air
pollutants are determined to have the
potential to exceed the South Coast
AQMD–adopted thresholds of
significance, City of Ontario Building
Department shall require feasible
mitigation measures to reduce air
quality emissions. Potential measures
shall be incorporated as conditions of
approval for a project and may
include:
• Require fugitive dust control
measures that exceed South Coast
Air Quality Management District’s
Rule 403, such as:
o Requiring use of nontoxic soil
stabilizers to reduce wind
erosion.
o Applying water every four
hours to active soil disturbing
activities.
o Tarping and/or maintaining a
minimum of 24 inches of
Implemented. The Project-specific Air
Quality Impact Analysis is summarized
within this Addendum and provided in
its entirety as Appendix C. Project
construction would not exceed
SCAQMD thresholds; further mitigation
is not required.
796
Addendum to The Ontario Plan 2050 Supplemental Environmental Impact Report File No(s).: PPA24-0139, PGPA24-004, PSPA24-004, PDEV24-017, PMTT24-008, PDA25-003
freeboard on trucks hauling
dirt, sand, soil, or other loose
materials.
• Using construction equipment
rated by the United States
Environmental Protection Agency
as having Tier 4 interim or higher
exhaust emission limits.
• Ensuring construction equipment is
properly serviced and maintained
to the manufacturer’s standards.
• Limiting nonessential idling of
construction equipment to no more
than five consecutive minutes.
• Using Super-Compliant VOC paints
for coating of architectural surfaces
whenever possible. A list of SuperCompliant architectural coating manufactures can be found on the
South Coast Air Quality
Management District’s website at:
http://www.aqmd.gov/prdas/broc
hures/Super-Compliant_AIM.pdf.
These identified measures shall be
incorporated into all appropriate
construction documents (e.g.,
construction management plans)
submitted to the City and shall be
verified by the City’s Planning
Department.
MM 3-2 The City of Ontario shall
evaluate new development proposals
within the City and require all
developments to include access or
linkages to alternative modes of
transportation, such as transit stops,
bike paths, and/or pedestrian paths
Applicable. Omnitrans Route 87
currently provides transit service to the
Project area, with a stop located at
the corner of Eucalyptus Avenue and
Hamner Avenue, less than 1,000 feet
from the Project site. The Project would
provide internal driveways and
pedestrian paths that connect to the
797
Addendum to The Ontario Plan 2050 Supplemental Environmental Impact Report File No(s).: PPA24-0139, PGPA24-004, PSPA24-004, PDEV24-017, PMTT24-008, PDA25-003
(e.g. sidewalks). existing street and sidewalk network
surrounding the Project site.
AQ-1 Prior to discretionary approval
by the City of Ontario for development
projects subject to CEQA (California
Environmental Quality Act) review (i.e.,
nonexempt projects), project
applicants shall prepare and submit a
technical assessment evaluating
potential project operation-phaserelated air quality impacts to the City of Ontario Planning Department for
review and approval. The evaluation
shall be prepared in conformance
with South Coast Air Quality
Management District (South Coast
AQMD) methodology in assessing air
quality impacts. If operation-related air
pollutants are determined to have the
potential to exceed the South Coast
AQMD–adopted thresholds of
significance, the City of Ontario
Planning Department shall require that
applicants for new development
projects incorporate mitigation
measures to reduce air pollutant
emissions during operational activities.
The identified measures shall be
included as part of the conditions of
approval. Possible mitigation measures
to reduce long-term emissions could
include, but are not limited to the
following:
• For site-specific development
that requires refrigerated vehicles, the
construction documents shall
demonstrate an adequate number of
electrical service connections at
loading docks for plug-in of the
anticipated number of refrigerated
trailers to reduce idling time and
Implemented. The Project-specific Air
Quality Impact Analysis is summarized
within this Addendum and provided in
its entirety as Appendix C. Project
operations would not exceed
SCAQMD thresholds; further mitigation
is not required.
798
Addendum to The Ontario Plan 2050 Supplemental Environmental Impact Report File No(s).: PPA24-0139, PGPA24-004, PSPA24-004, PDEV24-017, PMTT24-008, PDA25-003
emissions.
• Applicants for manufacturing
and light industrial uses shall consider
energy storage and combined heat
and power in appropriate applications
to optimize renewable energy
generation systems and avoid peak
energy use.
• Site-specific developments with
truck delivery and loading areas and
truck parking spaces shall include
signage as a reminder to limit idling of
vehicles while parked for
loading/unloading in accordance
with California Air Resources Board
Rule 2845 (13 CCR Chapter 10 sec.
2485).
• Provide changing/shower
facilities as specified in Section
A5.106.4.3 of CALGreen
(Nonresidential Voluntary Measures).
• Provide bicycle parking facilities
per Section A4.106.9 of CALGreen
(Residential Voluntary Measures).
• Provide preferential parking
spaces for low-emitting, fuel-efficient,
and carpool/van vehicles per Section
A5.106.5.1 of CALGreen
(Nonresidential Voluntary Measures).
• Provide facilities to support
electric charging stations per Section
A5.106.5.3 and Section A5.106.8.2 of
CALGreen (Nonresidential Voluntary
Measures; Residential Voluntary
Measures).
• Applicant-provided appliances
shall be Energy Star–certified
799
Addendum to The Ontario Plan 2050 Supplemental Environmental Impact Report File No(s).: PPA24-0139, PGPA24-004, PSPA24-004, PDEV24-017, PMTT24-008, PDA25-003
appliances or appliances of
equivalent energy efficiency (e.g.,
dishwashers, refrigerators, clothes
washers, and dryers). Installation of
Energy Star–certified or equivalent
appliances shall be verified by the City
during plan check.
c. Expose sensitive receptors to substantial pollutant concentrations? Summary of Certified SEIR Finding: The Certified SEIR notes that individual development projects within the City would be required to achieve the incremental risk thresholds established by SCAQMD, and on this basis, potential Toxic Air Contaminant (TAC) impacts from individual developments would be less than significant. TOP 2050 Policy ER4-9, New Localized Air Pollution Sources Near Existing Sensitive Receptors, ensures that mobile sources of TACs not covered under South Coast AQMD permits are considered during subsequent project-level environmental review by the City of Ontario. Other air quality mitigation measures implemented under TOP 2050 would further reduce air pollutant emissions, thereby minimizing effects of pollutants at sensitive receptors.
The Certified SEIR nonetheless concludes that buildout of TOP 2050 would generate TACs that could contribute to elevated levels of TAC pollutants in the air basin. On this basis, the Certified SEIR concluded that TOP 2050 TAC emission impacts at sensitive receptors would be cumulatively significant (Certified SEIR, p.
5.3-57).
Project Impacts:
Construction
To analyze Project impacts to vicinity sensitive receptors, the localized emissions associated with Project construction were developed and compared to applicable SCAQMD thresholds. Peak site preparation and grading activities were used for analysis, since this phase represents the maximum localized emissions that would occur. Table 3-4 presents the localized construction emissions of the Project, along with the applicable thresholds. 800
Addendum to The Ontario Plan 2050 Supplemental Environmental Impact Report File No(s).: PPA24-0139, PGPA24-004, PSPA24-004, PDEV24-017, PMTT24-008, PDA25-003
Table 3-4
Localized Construction Impacts
Emissions (lbs/day)
NOX CO PM10 PM2.5
Site Preparation
Maximum Daily Emissions 34.61 31.01 7.43 4.31
SCAQMD Threshold 220 1,713 11 7
Threshold Exceeded? No No No No
Grading
Maximum Daily Emissions 29.95 28.67 4.05 2.25
SCAQMD Threshold 237 1,873 13 8
Threshold Exceeded? No No No No
Source: Urban Crossroads, 2025a
As shown above, localized emissions associated with Project construction would not exceed applicable SCAQMD thresholds.
Toxic Air Contaminants
Residential uses proposed by the Project would not result in toxic air contaminants (TACs) during operation. The Certified SEIR, which evaluated regional emissions from mobile sources resulting from implementation of TOP 2050, concluded that the implementation of 2050 would not produce the volume of traffic required to generate a CO hotspot, and CO hotspots impacts would be less than significant.
As identified in Checklist item 17, Traffic, the proposed Project would generate fewer vehicular trips than anticipated and evaluated in the Certified SEIR.
Therefore, the proposed Project would not expose sensitive receptors to substantial localized CO concentrations, consistent with the conclusion of the TOP Final SEIR. Therefore, sensitive receptors would not be exposed to substantial pollutant concentrations as the result of Project operations.
Based on the foregoing, the Project would not expose sensitive receptors near the Project site to significant pollutant concentrations during construction and operation. Therefore, the Project would not result in any new, increased or substantially different impacts, other than those previously considered and addressed in the Certified SEIR.
801
Addendum to The Ontario Plan 2050 Supplemental Environmental Impact Report File No(s).: PPA24-0139, PGPA24-004, PSPA24-004, PDEV24-017, PMTT24-008, PDA25-003
Mitigation:
Certified SEIR Measure(s) Project Applicability
None. -
d. Result in other emissions (such as those leading to odors adversely affecting a substantial number of people)?
Summary of Certified SEIR Finding: The Certified SEIR notes that development pursuant to TOP 2050 would be required to comply with SCAQMD Rule 402.
SCAQMD Rule 402 acts to generally control and regulate odors and odor sources, thereby minimizing potential effects of construction-source and operationalsource odors from other than industrial land uses (Certified SEIR, p. 5.3-46).
The Certified SEIR also acknowledges that certain types of industrial land uses (e.g., compost facilities, landfills, solid-waste transfer stations, fiberglass manufacturing facilities, paint/coating operations, asphalt batch manufacturing plants, chemical manufacturing, and food manufacturing facilities) warrant focused odor impact analyses. The City would require site- and developmentspecific analyses to ensure that any odors generated by these types of land uses would not adversely affect a substantial number of people (Certified SEIR, p. 5.3- 46).
Based on the preceding, the Certified SEIR concluded that the potential for TOP 2050 to create or result in odors that would adversely affect a substantial number of people would be less than significant.
Project Impacts: Land uses generally associated with odor complaints include uses such as agricultural uses, wastewater treatment plants, chemical plants, composting operations, refineries, landfills, and dairies. The Project does not propose land uses typically associated with emitting objectionable odors.
Potential odor sources associated with the Project may result from construction equipment exhaust and the application of concrete and architectural coatings during construction activities and the temporary storage of typical solid waste (refuse) associated with the Project’s (long-term operational) uses. Standard 802
Addendum to The Ontario Plan 2050 Supplemental Environmental Impact Report File No(s).: PPA24-0139, PGPA24-004, PSPA24-004, PDEV24-017, PMTT24-008, PDA25-003