5. To the best of your knowledge, have there ever been any incidents of chemical spills/dumping or waste disposal on or close to this property?
6. Are there any wells on the site? If yes, what are they used for? SECTION II – Developed Property
1. What is your involvement with this property and when did that involvement begin?
2. To the best of your knowledge, how long has the current development been on the property? What was there before the current development?
3. Does this facility use, store, manufacture, or dispose of chemicals or petroleum products? What types (be as specific as possible)?
4. If the answer to Question 3 above was “Yes,” may we review MSDS, business plans, hazardous material inventories, manifest files, SPCC plans (whatever is applicable)?
5. Do you have any environmental permits (wastewater discharge, air emissions, hazardous material storage, etc.)? Have there ever been any Notices of Violation in regards to any of these permits?
1618
Owner/Operator Questionnaire
6. Have any environmental investigations ever been conducted on this property? When and why? Are there any reports available that we can review?
7. Has the facility ever been subject to an environmental health and safety regulatory action, complaint, or lawsuit? When and why? What was the outcome?
8. Have there been any know chemical spills or releases on this property?
9. Are there any underground or aboveground storage tanks on this property? How many? Sizes? Ages?
10. Where is wastewater discharged to? To the best of your knowledge, have there ever been any onsite wastewater disposal systems (septic tank, leach field, cesspool, dry well, etc.)?
11. To the best of your knowledge, are there any environmental liens or deed restrictions associated with this property? If yes, please describe.
1619
1 The document is designed to comply with Appendix X3, User Questionnaire, of ASTM E1527-21, Standard Practice for Environmental Site Assessments: Phase I Environmental Site Assessment Process, and the U.S. EPA AAI regulations (40 CFR §312).
Environmental Consulting & Contracting
Project No.:
Project Name:
USER QUESTIONNAIRE1
Site Name: ____________________________________________ Site Address: ____________________________________________ ____________________________________________
Interviewee: ____________________________________________ Title: ____________________________________________
Date: ____________________________________________
In reference to Section 6, User Responsibilities, of the ASTM E1527-21 Standard Practice, the Environmental Professional (SCS Engineers) for this Phase I ESA is required to inquire with the user (Client) regarding their knowledge or possession of information that may assist in identifying recognized environmental conditions (RECs) pertaining to the Subject Property.
In order to qualify for one of the Landowner Liability Protections (LLPs) offered by the Small Business Liability Relief and Brownfields Revitalization Act of 2001 (the “Brownfields Amendments”), the user must conduct the following inquiries required by 40 CFR §312.25, §312.28, §312.29, §312.30, and §312.31. These inquiries must also be conducted by U.S. EPA Brownfield Assessment and Characterization grantees. The user should provide the following information to the Environmental Professional overseeing this Phase I ESA. Failure to conduct these inquiries could result in a determination that “all appropriate inquiries” is not complete. (1) Environmental Cleanup Liens (40 CFR §312.25). Did a search of land title records (or judicial records where appropriate) identify any environmental liens filed or recorded against the Subject Property under federal, tribal, state or local law? Yes No If Yes, explain and/or provide information:
(2) Activity and Use Limitations (40 CFR §312.26(a)(1)(v) and (vi)). Did a search of land title records (or judicial records, where appropriate) identify any Activity Use Limitations (AULs) such as engineering controls, land use restrictions, or institutional controls that are in place at the Subject Property and/or have been filed or recorded against the Subject Property under federal, tribal, state or local law? Yes No
Yes No
If Yes, explain and/or provide information:
1620
User Questionnaire
(3) Specialized Knowledge or Experience (40 CFR §312.28). Do you have any specialized knowledge or experience related to the Subject Property or nearby properties? For example, are you involved in the same line of business as the current or former occupants of the Subject Property or an adjoining property so that you would have specialized knowledge of the chemicals and processes used by this type of business? Yes No
If Yes, explain and/or provide information:
(4) Purchase Price vs. Fair Market Value (40 CFR §312.29). Does the purchase price being paid for this Subject Property reasonably reflect its fair market value? Yes No If you conclude that there is a difference, have you considered whether the lower purchase price is because contamination is known or believed to be present at the Subject Property? Yes No
If Yes, explain and/or provide information:
(5) Commonly Known or Reasonably Ascertainable Information (40 CFR §312.30). Are you aware of commonly known or reasonably ascertainable information about the Subject Property that would help the Environmental Professional to identify conditions indicative of releases or threatened releases? For example:
(a) Do you know the past use of the Subject Property?
(b) Do you know specific chemicals that are present or once were present at the Subject Property? (c) Do you know of spills or other chemical releases that have taken place at the Subject Property? (d) Do you know of any environmental cleanups that have taken place at the Subject Property? Yes No to all
If Yes, explain and/or provide information:
(6) Obvious Indications of Contamination (40 CFR §312.31). Based on your knowledge and experience related to the Subject Property, are there any obvious indicators that point to the presence or likely presence of releases at the Subject Property? Yes No If Yes, explain and/or provide information:
1621
Phase I ESA – 10.02-acres at NE Corner of Amherst and Eucalyptus Avenues www.scsengineers.com Appendix G
Project Personnel Resumes
1622
SCS Resume – Rauzon www.scsengineers.com
1 J. JUSTIN RAUZON, REPA
Education
MEM – Environmental Management, Duke University, 2014
BS – Zoology (Double Emphasis: Human and Marine Biology), Brigham Young University, 2004
Professional Licenses
Registered Environmental Property Assessor (REPA), National Registry of Environmental Professionals (No. 485639)
Specialty Certifications
OSHA 40-Hour Health and Safety Training for Hazardous Waste Workers 8-Hour Annual Refresher Training for Hazardous Waste Site Activities OSHA 16-Hour Initial Asbestos Operations and Maintenance Training Thermo Scientific Niton XRF Analyzer Operator’s Training First-Aid and CPR Training
Professional Affiliations
National Ground Water Association, Member (2015 to Present) Industrial Environmental Association, Member (2018 to Present) Professional Experience
Mr. Rauzon has more than 16 years of environmental services experience, all with SCS. Fluent in Spanish, Mr. Rauzon is an SCS Project Manager with a diverse background in biological and environmental sciences, and regularly performs environmental assessments and compliance audits at sites in the U.S. and in Latin America. He has technical and management experience with soil, soil vapor, and groundwater investigations at industrial, commercial, landfill, greenfield, and residential properties. He has extensive experience with environmental laws and regulations in both the U.S. and Mexico. His work experience includes all project phases, from development of cost estimates for various site assessment and cleanup programs to implementing remediation programs and interfacing with regulatory agencies. His experience with and understanding of these issues led to his appointment as a National Partner in Environmental Due Diligence in 2021.
Selected projects in which he has participated are described below.
Environmental Management
Due Diligence Assessments of Properties Prior to Real Estate Transfer of Properties in California, Arizona, New Jersey, Mexico, Puerto Rico, and the Dominican Republic. Mr. Rauzon has completed numerous due diligence assessments of properties prior to acquisition, disposition, or loan financing by investment banks, insurance companies, corporations, non-profit entities, real Justin Rauzon, REPA
1623
SCS Resume – Rauzon www.scsengineers.com
2 estate developers, and private parties. Projects have included Phase I assessments that meet federal All Appropriate Investigation (AAI) regulations, American Society for Testing and Materials (ASTM) standards, and client-specific guidelines; inspections for asbestos and lead-based paint; Phase II investigations; preparation of abatement and remediation cost estimates; and regulatory agency coordination. These projects frequently involve review of previous environmental reports and investigation of current and past on-site operations, regulatory agency records searches, evaluation of historical property use information, identification of nearby potentially contaminated sites, and development of appropriate conclusions about environmental risks. Investigations involve preparation of work plans, soil boring and subsequent sampling, groundwater well installation and sampling, soil gas probe installation and sampling, precision mapping, evaluation of contaminants in accordance with regulatory requirements or generally accepted guidelines, preparation of investigation report, and analysis of applicable remedial alternatives. Mr. Rauzon has served as the Project Manager for sites that have received regulatory closure from various regulatory agencies.
Planning, Coordinating, and Supervising Remedial Actions That Included Excavation, Transport, and Disposal of Contaminated Soils and Water. Investigations involve preparation of Remedial Action Plans (RAPs), direction of fieldwork, oversight of confirmatory sampling, and interfacing with regulatory agencies.
Groundwater Monitoring and Reporting for Simi Valley Landfill and Recycling Center, Simi Valley, CA. Mr. Rauzon is a key team member for the sampling and monitoring of 10 groundwater wells and 5 leachate locations to evaluate potential releases from waste units affecting groundwater at Simi Valley Landfill. He also prepares the annual leachate control system’s effectiveness reports and documents results of resampling of groundwater wells based on initial statistical indications of a release.
The Characterization of Hazardous Waste Materials. These projects include collection of soil and/or liquid samples to profile the waste materials, interpretation of laboratory results, and evaluation of disposal/recycling options to minimize the costs and liabilities to clients associated with the removal of wastes.
Assessment and Certification of Hazardous Waste Tank Systems. These investigations involve working with a Professional Engineer to complete field inspections of hazardous waste tanks, associated ancillary equipment, leak-detection systems, and secondary containment devices, as well as interfacing with regulatory agencies.
Project Management
Project Manager for Environmental Due Diligence Assessment and Health and Safety Program Review of Six Geothermal Power Plants Located in California, Nevada, New Mexico, and Utah.
SCS services included time-sensitive field inspection, environmental document and permit review, and preparation of environmental risk evaluation reports. Mr. Rauzon reviewed and assessed plant health and safety plans and procedures; facility response plans; incident reports; and arrangements for plant selection, appointment, and management of support contractors. SCS provided support consulting services in the successful client plant acquisition and integration support.
Project Manager for Due Diligence Investigations at Dry Mill and Biofuel Distillery Plant, Madera, CA. SCS services included Phase I environmental assessment and Phase II soil, soil vapor, and groundwater investigation to support client’s acquisition of an ethanol production plant at which a lumber mill was historically located. SCS provided additional consulting services related to remediation cost analysis and management of ongoing environmental issues. 1624
SCS Resume – Rauzon www.scsengineers.com
3 Project Manager for Due Diligence Investigation of a Portfolio With More Than 300 Industrial Sites Throughout Mexico. SCS services included conducting Phase I and Phase II environmental assessments within the strict timeline of the $1.2 billion industrial real estate transaction.
Subsequent to the closing of the deal, SCS provided ongoing consulting services to facilitate integration and management of various facilities with ongoing environmental issues.
Project Manager for Hazardous Materials Consulting Services in Support of the State Route 91 Corridor Improvement Project in Orange and Riverside Counties, CA. SCS services included sampling and inventory of potentially hazardous materials associated with more than 25 bridges along the SR-91 and I-15 freeways; environmental assessments on properties within the proposed freeway expansion area; and soil testing for herbicides, pesticides, and fungicides on several land parcels.
Project Manager for Investigation and Remediation of Industrial Facility Located in Fontana, CA.
SCS conducted a series of environmental assessments, investigations, and remedial activities that provided sufficient information to identify environmental issues and business risks, and facilitate the client’s successful purchase of property. A number of recognized environmental conditions, including releases of coal tar, solvents, heavy metals, and total petroleum hydrocarbons, were identified.
Project activities conducted during the acquisition and redevelopment of the property included shallow and deep soil and soil vapor investigations; installation of groundwater monitoring wells and subsequent groundwater sampling; subsequent remedial excavation under San Bernardino County Fire Department (SBCFD) oversight to obtain closure; and excavation and off-site disposition of contaminated soil.
Health and Safety
Mr. Rauzon has participated in a certified health and safety program in compliance with OSHA Standard 29 CFR 1910.120. He is knowledgeable in incident response operations, team functions, personnel safety, and field equipment. He is able to recognize and evaluate potential chemical and physical hazards and associated risks in field operations; discuss and use personal protective equipment (PPE), such as respiratory protection and protective clothing; use and interpret directreading instruments; and examine and establish Standard Operating Safety Guidelines to ensure safe and effective response operations.
Publications
Rauzon, J. J., “Mexico: Environmental Due Diligence and the Mexican Waste Law,” EHS Journal, November 13, 2010.
1625
SCS Resume – Peterson www.scsengineers.com
1 MADDIE PETERSON
Education
BA – Environmental Science and Policy, California State University, Long Beach, 2022 AA – Liberal Arts and Sciences/Communications, College of the Canyons, 2017 Specialty Certifications
40-Hour HAZWOPER Trained
SCAQMD Dust Control Officer Trained (Rule 403)
Professional Experience
Ms. Peterson is an Associate Professional who has participated in Phase I and II site investigations, sampling and monitoring at landfills, methane assessments, geophysical surveys and monitoring well installations, and pesticide and heavy metal evaluations. She has a background in environmental law and policy and sustainability. As an undergraduate, she performed heavy metal analysis and research regarding lead and zinc concentrations in soil samples for the Environmental Science and Policy Capstone Project in Long Beach (2022), and has volunteered for habitat restoration and other environmental improvement projects in Southern California.
Her SCS project work includes:
Phase I Environmental Site Assessments (ESAs). Ms. Peterson has contributed to Phase I Environmental Site Assessments (ESAs), completed in accordance with various lender, American Society for Testing and Materials (ASTM), or government guidelines. Activities consisted of evaluating current and past on-site operations, generating historical property use information, identifying potentially contaminated sites in the surrounding areas, reviewing previous reports and/or files maintained by regulatory agencies, and developing conclusions regarding the presence of Recognized Environmental Conditions (RECs) and recommendations for further investigation.
Site Investigations. Ms. Peterson has conducted soil gas surveys and soil sampling with precision mapping of sites, installation of soil borings, lithologic logging, collection of soil samples, and evaluation of subsurface contaminants in soil and groundwater in accordance with regulatory agency requirements or generally accepted guidelines.
Quarterly and Semiannual Groundwater Monitoring Reports. Ms. Peterson has assisted in preparation of numerous routine monitoring reports for various sites with oversight of various regulatory agencies. Facilities have included landfills across California and manufacturing sites.
Construction Quality Assurance (CQA). Ms. Peterson has assisted in CQA and oversight of the construction of gas collection and control system (GCCS) vertical well installation at Simi Valley, Antelope Valley, and El Sobrante Landfills.
Investigation and Remediation for Industrial Facility Redevelopment, Downey, CA. SCS conducted a series of environmental assessments, investigations, and remedial activities that provided sufficient information to identify the environmental issues, and business risks to facilitate the client’s successful purchase of property for redevelopment to a commercial warehouse and office. A number of Recognized Environmental Conditions (RECs) were identified. Ms. Peterson provided oversight for numerous activities conducted concurrently with the redevelopment of the property, including the installation of groundwater monitoring wells, both on and off site; oversight of well development; soil vapor extraction (SVE) network monitoring; and permitting and removal of clarifiers. 1626
DRAINAGE STUDY
FOR
TRACT NO. 20730
ESPERANZA – PA II
EUCALYPTUS AVENUE & AMHERST AVENUE
ONTARIO, CA
MARCH 2025
PREPARED BY:
WALDEN & ASSOCIATES
2552 WHITE ROAD, SUITE B
IRVINE, CA 92614
JN: 2175-996-001
2552 WHITE ROAD, SUITE B • IRVINE, CA 92614
949/660-0110 FAX: 660-0418
CIVIL ENGINEERS - PLANNERS - LAND SURVEYORS
1627
TABLE OF CONTENTS
SECTION
DISCUSSION 1
PURPOSE
DESCRIPTION OF WATERSHED
METHODOLOGY
SUMMARY
VICINITY MAP 2
HYDROLOGIC CLASSIFICATION OF SOIL PER SAN BERNARDINO
COUNTY HYDROLOGY MANUAL
3 ISOHYETAL MAP 4
RATIONAL METHOD HYDROLOGY –
EXISTING CONDITIONS
5 PROPOSED CONDITIONS
CATCH BASIN SIZING (100-YEAR) CALCULATIONS 6
HYDROGRAPH 7
ORIFICE CALCULATION 8
HYDROLOGY MAP POCKET
EXISTING CONDITION
DEVELOPED CONDITION
1628
SECTION 1
DISCUSSION
1629
PURPOSE:
This report was prepared to supplement the preliminary grading plan for Esperanza – PA II, Tentative Tract No. 20730 in the City of Ontario, County of San Beranrdino.
The project is bounded by Clifton Avenue to the north, Eucalyptus Avenue to the east, Amherst Avenue to the south and Chatham Street to the west, in the City of Ontario. This report includes the existing and proposed Q100 for the10.0-acre project site. The study abides by the most current City of Ontario requirements and the San Bernardino County Hydrology Manual procedures.
DESCRIPTION OF WATERSHED:
The existing site is undeveloped and relatively flat and surface flows in a southwesterly direction towards the intersection of Eucalyptus Avenue and Amherst Avenue where an onsite detention basin is located. The basin has a 36-inch inlet that joins a public storm drain in Amherst Avenue. The proposed site will drain in a similar direction with its own storm drain system throughout the development and will join the Amherst storm drain as stated above.
Acreage 100-Year
Existing
A 10.02 ac 20.34 cfs
Proposed
A 8.42 ac 27.60 cfs
B 1.60 ac 6.92 cfs
Total 10.02 ac 34.52 cfs
Difference - <-14.18> cfs
Mitigation is required when the proposed exceeds the existing as shown in the table above; however, the city has confirmed that there is a more restrictive Q that must be used in place of the existing Q that was established by this study. The Q to be used was established by Tract 17931, at line ‘D’, using a Q100 of15.64 cfs.as the maximum flow allowed from the site into the public storm drain.
The tract’s private onsite storm drain system will function with the necessary flow restriction as established by the City. This will be accomplished by over-sizing the private onsite storm drain system to provide on-site storage and installing a stainlesssteel plate with a 16”x24” opening (orifice) over the downstream side of the junction structure, before entering the public system. This will restrict the outflow from the site to no more than 15.64 cfs at any time. The volume to be stored is approximately 5,100 cubic feet (cf) (See Table A) as determined by the hydrograph in this study All proposed inlets and storm drain piping have been designed for a Q100 storm event, and emergency overflow drain patterns have been considered if drainage clogging should occur.
1630
METHODOLOGY:
This Hydrology Study was performed using the rational Hydrology Method Program by CivilCADD / Civil Design Engineering software based on the San Bernardino County Hydrology Manual dated August 1986. The soil has been identified from the maps accompanying the San Bernardino County Hydrology Manual as being of Hydrologic Soil Group B. The calculations were done for a 100-year storm frequency for the storm drain system.
SUMMARY:
The plans for which this report supports has been prepared to meet the standards of rainstorm protection as adopted by the City of Ontario. Positive overflow is available throughout the development for protection of habitable areas against the 100-year storm when drainage obstructions occur, and there will be no adverse impact to the existing conditions.
1631
TABLE A VOLUME STORAGE CALCULATIONS FOR THE PRIVATE
ONSITE STORM DRAIN PIPE
TRACT 20730 2175 – 996 -001
ON SITE PIPE SUMMARY (MAIN LINE ONLY)
PIPE SIZE
ESTIMATED
(IN)
LENGTH
OF PIPE
(FT)
INTERNAL
AREASTARTING
(SQ FT)
PIPE
VOLUMESTARTING
(CU FT)
PIPE SIZE
FOR
STORAGE
(IN)
PIPE INTERNAL
AREA - (SQ FT)
STORAGE
PIPE
VOLUME
(CU FT)
PIPE
INTERNAL
AREA -GAINED
(SQ FT)
PIPE
VOLUME
GAINED
(CU FT)
LINE '
A' 18 710 1.8 1,280 36 7.1 5,045 5.3 3,765
LINE '
A' 24 380 3.1 1,180 36 7.1 2,700
4 1,520
LINE 'B' 8 185 0.4 75 - - - - 0
LINE 'C' 12 155 0.8 125 - - - - 0LINE 'C' 18 570 1.8 1,030 24 3.1 1,770 1.3 740 TOTAL 2,000 3,690 9,515 6,025
STORAGE REQUIRED = 5,100
STORAGE PROVIDED = 6,025
1632
SECTION 2
VICINITY MAP
1633
2552 WHITE ROAD, SUITE B IRVINE, CA 92614-6236
(949) 660-0110 FAX: 660-0418
CIVIL ENGINEERS - LAND SURVEYORS - PLANNERS
Sheet
Date
Engr.
W.O. No.
Chk'd. of
ONTARIO, CA
EUCALYPTUS AVE. AND S. AMHERST AVE.
VICINITY MAP
SITE
1634
SECTION 3
HYDROLOGIC CLASSIFICATION
OF SOIL PER SAN BERNARDINO COUNTY
HYDROLOGY MANUAL
1635
1636
SECTION 4
ISOHYETAL MAP
1637
1638
1639
1640
1641
1642
1643
SECTION 5.1
HYDROLOGY STUDY
100-YEAR - EXISTING
1644
San Bernardino County Rational Hydrology Program
(Hydrology Manual Date - August 1986)
CIVILCADD/CIVILDESIGN Engineering Software, (c) 1989-2012 Version 7.2 Rational Hydrology Study Date: 07/11/24
------------------------------------------------------------------------ Program License Serial Number 6293
------------------------------------------------------------------------ ********* Hydrology Study Control Information ********** ------------------------------------------------------------------------ Rational hydrology study storm event year is 100.0
Computed rainfall intensity:
Storm year = 100.00 1 hour rainfall = 1.200 (In.)
Slope used for rainfall intensity curve b = 0.6000
Soil antecedent moisture condition (AMC) = 3
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 1.000 to Point/Station 2.000 **** INITIAL AREA EVALUATION ****A-1
______________________________________________________________________ UNDEVELOPED (poor cover) subarea
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 78.00
Adjusted SCS curve number for AMC 3 = 92.80
Pervious ratio(Ap) = 1.0000 Max loss rate(Fm)= 0.140(In/Hr) Initial subarea data:
Initial area flow distance = 420.000(Ft.)
Top (of initial area) elevation = 711.000(Ft.)
Bottom (of initial area) elevation = 705.000(Ft.)
Difference in elevation = 6.000(Ft.)
Slope = 0.01429 s(%)= 1.43
TC = k(0.525)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 13.756 min.
Rainfall intensity = 2.904(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.857 Subarea runoff = 3.259(CFS)
Total initial stream area = 1.310(Ac.)
Pervious area fraction = 1.000
Initial area Fm value = 0.140(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 2.000 to Point/Station 3.000 **** IRREGULAR CHANNEL FLOW TRAVEL TIME ****A-2
______________________________________________________________________ Estimated mean flow rate at midpoint of channel = 0.000(CFS) Depth of flow = 0.901(Ft.), Average velocity = 2.372(Ft/s) ******* Irregular Channel Data ***********
----------------------------------------------------------------- Information entered for subchannel number 1 :
Point number 'X' coordinate 'Y' coordinate
1 0.00 5.00
2 3.80 4.00
1645
3 6.30 3.00
4 10.20 2.00
5 15.40 1.00
6 22.60 0.00
7 27.70 1.00
8 35.50 2.00
9 41.40 3.00
10 50.50 4.00
11 68.20 4.00
Manning's 'N' friction factor = 0.030
----------------------------------------------------------------- Sub-Channel flow = 11.843(CFS)
' ' flow top width = 11.083(Ft.)
' ' velocity= 2.372(Ft/s)
' ' area = 4.994(Sq.Ft)
' ' Froude number = 0.623
Upstream point elevation = 705.000(Ft.)
Downstream point elevation = 700.000(Ft.)
Flow length = 740.000(Ft.)
Travel time = 5.20 min.
Time of concentration = 18.96 min.
Depth of flow = 0.901(Ft.)
Average velocity = 2.372(Ft/s)
Total irregular channel flow = 11.843(CFS)
Irregular channel normal depth above invert elev. = 0.901(Ft.) Average velocity of channel(s) = 2.372(Ft/s)
Adding area flow to channel
UNDEVELOPED (poor cover) subarea
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 78.00
Adjusted SCS curve number for AMC 3 = 92.80
Pervious ratio(Ap) = 1.0000 Max loss rate(Fm)= 0.140(In/Hr) Rainfall intensity = 2.396(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area,(total area with modified rational method)(Q=KCIA) is C = 0.847
Subarea runoff = 17.083(CFS) for 8.710(Ac.)
Total runoff = 20.341(CFS)
Effective area this stream = 10.02(Ac.)
Total Study Area (Main Stream No. 1) = 10.02(Ac.)
Area averaged Fm value = 0.140(In/Hr)
Depth of flow = 1.105(Ft.), Average velocity = 2.708(Ft/s) End of computations, Total Study Area = 10.02 (Ac.)
The following figures may
be used for a unit hydrograph study of the same area.
Note: These figures do not consider reduced effective area effects caused by confluences in the rational equation.
Area averaged pervious area fraction(Ap) = 1.000
Area averaged SCS curve number = 78.0
1646
SECTION 5.2
HYDROLOGY STUDY
100-YEAR - PROPOSED
1647
San Bernardino County Rational Hydrology Program
(Hydrology Manual Date - August 1986)
CIVILCADD/CIVILDESIGN Engineering Software, (c) 1989-2012 Version 7.2 Rational Hydrology Study Date: 07/18/24
------------------------------------------------------------------------
ESPERANZA - PA II
EUCALYPTUS AVENUE & AMHERST AVENUE
PROPOSED Q100
ONTARIO, CALIFORNIA
------------------------------------------------------------------------ Program License Serial Number 6293
------------------------------------------------------------------------ ********* Hydrology Study Control Information ********** ------------------------------------------------------------------------ Rational hydrology study storm event year is 100.0
Computed rainfall intensity:
Storm year = 100.00 1 hour rainfall = 1.200 (In.)
Slope used for rainfall intensity curve b = 0.6000
Soil antecedent moisture condition (AMC) = 3
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 1.000 to Point/Station 2.000 **** INITIAL AREA EVALUATION ****A-1
______________________________________________________________________ RESIDENTIAL(11+ dwl/acre)
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 56.00
Adjusted SCS curve number for AMC 3 = 75.80
Pervious ratio(Ap) = 0.2000 Max loss rate(Fm)= 0.088(In/Hr) Initial subarea data:
Initial area flow distance = 100.000(Ft.)
Top (of initial area) elevation = 710.510(Ft.)
Bottom (of initial area) elevation = 709.000(Ft.)
Difference in elevation = 1.510(Ft.)
Slope = 0.01510 s(%)= 1.51
TC = k(0.324)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 4.729 min.
Rainfall intensity = 5.511(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.886 Subarea runoff = 0.586(CFS)
Total initial stream area = 0.120(Ac.)
Pervious area fraction = 0.200
Initial area Fm value = 0.088(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 2.000 to Point/Station 3.000 **** PIPEFLOW TRAVEL TIME (Program estimated size) **** ______________________________________________________________________ Upstream point/station elevation = 706.000(Ft.)
Downstream point/station elevation = 705.240(Ft.)
Pipe length = 117.00(Ft.) Manning's N = 0.012
1648
No. of pipes = 1 Required pipe flow = 0.586(CFS)
Nearest computed pipe diameter = 9.00(In.)
Calculated individual pipe flow = 0.586(CFS)
Normal flow depth in pipe = 3.99(In.)
Flow top width inside pipe = 8.94(In.)
Critical Depth = 4.16(In.)
Pipe flow velocity = 3.10(Ft/s)
Travel time through pipe = 0.63 min.
Time of concentration (TC) = 5.36 min.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 3.000 to Point/Station 3.000 **** SUBAREA FLOW ADDITION **** A-2
______________________________________________________________________ RESIDENTIAL(11+ dwl/acre)
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 56.00
Adjusted SCS curve number for AMC 3 = 75.80
Pervious ratio(Ap) = 0.2000 Max loss rate(Fm)= 0.088(In/Hr) Time of concentration = 5.36 min.
Rainfall intensity = 5.113(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area,(total area with modified rational method)(Q=KCIA) is C = 0.885
Subarea runoff = 0.590(CFS) for 0.140(Ac.)
Total runoff = 1.176(CFS)
Effective area this stream = 0.26(Ac.)
Total Study Area (Main Stream No. 1) = 0.26(Ac.)
Area averaged Fm value = 0.088(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 3.000 to Point/Station 4.000 **** PIPEFLOW TRAVEL TIME (Program estimated size) **** ______________________________________________________________________ Upstream point/station elevation = 705.240(Ft.)
Downstream point/station elevation = 704.690(Ft.)
Pipe length = 110.00(Ft.) Manning's N = 0.012
No. of pipes = 1 Required pipe flow = 1.176(CFS)
Nearest computed pipe diameter = 9.00(In.)
Calculated individual pipe flow = 1.176(CFS)
Normal flow depth in pipe = 6.86(In.)
Flow top width inside pipe = 7.67(In.)
Critical Depth = 5.98(In.)
Pipe flow velocity = 3.26(Ft/s)
Travel time through pipe = 0.56 min.
Time of concentration (TC) = 5.92 min.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 4.000 to Point/Station 4.000 **** SUBAREA FLOW ADDITION **** A-3
______________________________________________________________________ RESIDENTIAL(11+ dwl/acre)
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 56.00
Adjusted SCS curve number for AMC 3 = 75.80
1649
Pervious ratio(Ap) = 0.2000 Max loss rate(Fm)= 0.088(In/Hr) Time of concentration = 5.92 min.
Rainfall intensity = 4.816(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area,(total area with modified rational method)(Q=KCIA) is C = 0.884
Subarea runoff = 0.781(CFS) for 0.200(Ac.)
Total runoff = 1.957(CFS)
Effective area this stream = 0.46(Ac.)
Total Study Area (Main Stream No. 1) = 0.46(Ac.)
Area averaged Fm value = 0.088(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 4.000 to Point/Station 5.000 **** PIPEFLOW TRAVEL TIME (Program estimated size) **** ______________________________________________________________________ Upstream point/station elevation = 704.690(Ft.)
Downstream point/station elevation = 704.610(Ft.)
Pipe length = 15.00(Ft.) Manning's N = 0.012
No. of pipes = 1 Required pipe flow = 1.957(CFS)
Nearest computed pipe diameter = 12.00(In.)
Calculated individual pipe flow = 1.957(CFS)
Normal flow depth in pipe = 7.36(In.)
Flow top width inside pipe = 11.69(In.)
Critical Depth = 7.15(In.)
Pipe flow velocity = 3.88(Ft/s)
Travel time through pipe = 0.06 min.
Time of concentration (TC) = 5.99 min.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 5.000 to Point/Station 5.000 **** SUBAREA FLOW ADDITION **** A-4
______________________________________________________________________ RESIDENTIAL(11+ dwl/acre)
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 56.00
Adjusted SCS curve number for AMC 3 = 75.80
Pervious ratio(Ap) = 0.2000 Max loss rate(Fm)= 0.088(In/Hr) Time of concentration = 5.99 min.
Rainfall intensity = 4.784(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area,(total area with modified rational method)(Q=KCIA) is C = 0.883
Subarea runoff = 1.889(CFS) for 0.450(Ac.)
Total runoff = 3.846(CFS)
Effective area this stream = 0.91(Ac.)
Total Study Area (Main Stream No. 1) = 0.91(Ac.)
Area averaged Fm value = 0.088(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 5.000 to Point/Station 6.000 **** PIPEFLOW TRAVEL TIME (Program estimated size) **** ______________________________________________________________________ Upstream point/station elevation = 704.610(Ft.)
Downstream point/station elevation = 703.830(Ft.)
Pipe length = 156.00(Ft.) Manning's N = 0.012
No. of pipes = 1 Required pipe flow = 3.846(CFS)
Nearest computed pipe diameter = 15.00(In.)
Calculated individual pipe flow = 3.846(CFS)
1650
Normal flow depth in pipe = 9.94(In.)
Flow top width inside pipe = 14.19(In.)
Critical Depth = 9.52(In.)
Pipe flow velocity = 4.46(Ft/s)
Travel time through pipe = 0.58 min.
Time of concentration (TC) = 6.57 min.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 6.000 to Point/Station 6.000 **** SUBAREA FLOW ADDITION **** A-5
______________________________________________________________________ RESIDENTIAL(11+ dwl/acre)
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 56.00
Adjusted SCS curve number for AMC 3 = 75.80
Pervious ratio(Ap) = 0.2000 Max loss rate(Fm)= 0.088(In/Hr) Time of concentration = 6.57 min.
Rainfall intensity = 4.525(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area,(total area with modified rational method)(Q=KCIA) is C = 0.882
Subarea runoff = 1.664(CFS) for 0.470(Ac.)
Total runoff = 5.510(CFS)
Effective area this stream = 1.38(Ac.)
Total Study Area (Main Stream No. 1) = 1.38(Ac.)
Area averaged Fm value = 0.088(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 6.000 to Point/Station 7.000 **** PIPEFLOW TRAVEL TIME (Program estimated size) **** ______________________________________________________________________ Upstream point/station elevation = 703.830(Ft.)
Downstream point/station elevation = 703.710(Ft.)
Pipe length = 15.00(Ft.) Manning's N = 0.012
No. of pipes = 1 Required pipe flow = 5.510(CFS)
Nearest computed pipe diameter = 15.00(In.)
Calculated individual pipe flow = 5.510(CFS)
Normal flow depth in pipe = 10.92(In.)
Flow top width inside pipe = 13.35(In.)
Critical Depth = 11.41(In.)
Pipe flow velocity = 5.76(Ft/s)
Travel time through pipe = 0.04 min.
Time of concentration (TC) = 6.61 min.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 7.000 to Point/Station 7.000 **** SUBAREA FLOW ADDITION **** A-6
______________________________________________________________________ RESIDENTIAL(11+ dwl/acre)
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 56.00
Adjusted SCS curve number for AMC 3 = 75.80
Pervious ratio(Ap) = 0.2000 Max loss rate(Fm)= 0.088(In/Hr) Time of concentration = 6.61 min.
Rainfall intensity = 4.507(In/Hr) for a 100.0 year storm 1651
Effective runoff coefficient used for area,(total area with modified rational method)(Q=KCIA) is C = 0.882
Subarea runoff = 2.364(CFS) for 0.600(Ac.)
Total runoff = 7.874(CFS)
Effective area this stream = 1.98(Ac.)
Total Study Area (Main Stream No. 1) = 1.98(Ac.)
Area averaged Fm value = 0.088(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 7.000 to Point/Station 8.000 **** PIPEFLOW TRAVEL TIME (Program estimated size) **** ______________________________________________________________________ Upstream point/station elevation = 703.710(Ft.)
Downstream point/station elevation = 703.270(Ft.)
Pipe length = 90.00(Ft.) Manning's N = 0.012
No. of pipes = 1 Required pipe flow = 7.874(CFS)
Nearest computed pipe diameter = 18.00(In.)
Calculated individual pipe flow = 7.874(CFS)
Normal flow depth in pipe = 14.58(In.)
Flow top width inside pipe = 14.13(In.)
Critical Depth = 13.04(In.)
Pipe flow velocity = 5.13(Ft/s)
Travel time through pipe = 0.29 min.
Time of concentration (TC) = 6.90 min.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 8.000 to Point/Station 8.000 **** SUBAREA FLOW ADDITION **** A-7
______________________________________________________________________ RESIDENTIAL(11+ dwl/acre)
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 56.00
Adjusted SCS curve number for AMC 3 = 75.80
Pervious ratio(Ap) = 0.2000 Max loss rate(Fm)= 0.088(In/Hr) Time of concentration = 6.90 min.
Rainfall intensity = 4.391(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area,(total area with modified rational method)(Q=KCIA) is C = 0.882
Subarea runoff = 0.763(CFS) for 0.250(Ac.)
Total runoff = 8.637(CFS)
Effective area this stream = 2.23(Ac.)
Total Study Area (Main Stream No. 1) = 2.23(Ac.)
Area averaged Fm value = 0.088(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 8.000 to Point/Station 9.000 **** PIPEFLOW TRAVEL TIME (Program estimated size) **** ______________________________________________________________________ Upstream point/station elevation = 703.270(Ft.)
Downstream point/station elevation = 702.910(Ft.)
Pipe length = 72.00(Ft.) Manning's N = 0.012
No. of pipes = 1 Required pipe flow = 8.637(CFS)
Nearest computed pipe diameter = 21.00(In.)
Calculated individual pipe flow = 8.637(CFS)
Normal flow depth in pipe = 13.09(In.)
Flow top width inside pipe = 20.35(In.)
Critical Depth = 13.11(In.)
1652
Pipe flow velocity = 5.48(Ft/s)
Travel time through pipe = 0.22 min.
Time of concentration (TC) = 7.12 min.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 9.000 to Point/Station 9.000 **** SUBAREA FLOW ADDITION **** A-8
______________________________________________________________________ RESIDENTIAL(11+ dwl/acre)
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 56.00
Adjusted SCS curve number for AMC 3 = 75.80
Pervious ratio(Ap) = 0.2000 Max loss rate(Fm)= 0.088(In/Hr) Time of concentration = 7.12 min.
Rainfall intensity = 4.310(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area,(total area with modified rational method)(Q=KCIA) is C = 0.882
Subarea runoff = 2.268(CFS) for 0.640(Ac.)
Total runoff = 10.905(CFS)
Effective area this stream = 2.87(Ac.)
Total Study Area (Main Stream No. 1) = 2.87(Ac.)
Area averaged Fm value = 0.088(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 9.000 to Point/Station 9.500 **** PIPEFLOW TRAVEL TIME (Program estimated size) **** ______________________________________________________________________ Upstream point/station elevation = 702.910(Ft.)
Downstream point/station elevation = 702.660(Ft.)
Pipe length = 50.00(Ft.) Manning's N = 0.012
No. of pipes = 1 Required pipe flow = 10.905(CFS)
Nearest computed pipe diameter = 21.00(In.)
Calculated individual pipe flow = 10.905(CFS)
Normal flow depth in pipe = 15.56(In.)
Flow top width inside pipe = 18.40(In.)
Critical Depth = 14.77(In.)
Pipe flow velocity = 5.71(Ft/s)
Travel time through pipe = 0.15 min.
Time of concentration (TC) = 7.27 min.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 9.500 to Point/Station 9.500 **** SUBAREA FLOW ADDITION **** A-9
______________________________________________________________________ RESIDENTIAL(11+ dwl/acre)
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 56.00
Adjusted SCS curve number for AMC 3 = 75.80
Pervious ratio(Ap) = 0.2000 Max loss rate(Fm)= 0.088(In/Hr) Time of concentration = 7.27 min.
Rainfall intensity = 4.258(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area,(total area with modified rational method)(Q=KCIA) is C = 0.881
Subarea runoff = 1.742(CFS) for 0.500(Ac.)
1653
Total runoff = 12.647(CFS)
Effective area this stream = 3.37(Ac.)
Total Study Area (Main Stream No. 1) = 3.37(Ac.)
Area averaged Fm value = 0.088(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 9.500 to Point/Station 14.000 **** PIPEFLOW TRAVEL TIME (Program estimated size) **** ______________________________________________________________________ Upstream point/station elevation = 702.660(Ft.)
Downstream point/station elevation = 702.560(Ft.)
Pipe length = 20.00(Ft.) Manning's N = 0.012
No. of pipes = 1 Required pipe flow = 12.647(CFS)
Nearest computed pipe diameter = 24.00(In.)
Calculated individual pipe flow = 12.647(CFS)
Normal flow depth in pipe = 15.21(In.)
Flow top width inside pipe = 23.12(In.)
Critical Depth = 15.36(In.)
Pipe flow velocity = 6.02(Ft/s)
Travel time through pipe = 0.06 min.
Time of concentration (TC) = 7.32 min.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 14.000 to Point/Station 14.000 **** CONFLUENCE OF MAIN STREAMS ****
______________________________________________________________________ The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 3.370(Ac.)
Runoff from this stream = 12.647(CFS)
Time of concentration = 7.32 min.
Rainfall intensity = 4.238(In/Hr)
Area averaged loss rate (Fm) = 0.0880(In/Hr)
Area averaged Pervious ratio (Ap) = 0.2000
Program is now starting with Main Stream No. 2
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 10.000 to Point/Station 11.000 **** INITIAL AREA EVALUATION **** A-10
______________________________________________________________________ RESIDENTIAL(11+ dwl/acre)
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 56.00
Adjusted SCS curve number for AMC 3 = 75.80
Pervious ratio(Ap) = 0.2000 Max loss rate(Fm)= 0.088(In/Hr) Initial subarea data:
Initial area flow distance = 180.000(Ft.)
Top (of initial area) elevation = 708.390(Ft.)
Bottom (of initial area) elevation = 707.500(Ft.)
Difference in elevation = 0.890(Ft.)
Slope = 0.00494 s(%)= 0.49
TC = k(0.324)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 7.479 min.
Rainfall intensity = 4.186(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.881 Subarea runoff = 0.590(CFS)
Total initial stream area = 0.160(Ac.)
1654
Pervious area fraction = 0.200
Initial area Fm value = 0.088(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 11.000 to Point/Station 12.000 **** PIPEFLOW TRAVEL TIME (Program estimated size) **** ______________________________________________________________________ Upstream point/station elevation = 705.000(Ft.)
Downstream point/station elevation = 704.200(Ft.)
Pipe length = 158.00(Ft.) Manning's N = 0.012
No. of pipes = 1 Required pipe flow = 0.590(CFS)
Nearest computed pipe diameter = 9.00(In.)
Calculated individual pipe flow = 0.590(CFS)
Normal flow depth in pipe = 4.30(In.)
Flow top width inside pipe = 8.99(In.)
Critical Depth = 4.18(In.)
Pipe flow velocity = 2.83(Ft/s)
Travel time through pipe = 0.93 min.
Time of concentration (TC) = 8.41 min.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 12.000 to Point/Station 12.000 **** SUBAREA FLOW ADDITION **** A-11
______________________________________________________________________ RESIDENTIAL(11+ dwl/acre)
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 56.00
Adjusted SCS curve number for AMC 3 = 75.80
Pervious ratio(Ap) = 0.2000 Max loss rate(Fm)= 0.088(In/Hr) Time of concentration = 8.41 min.
Rainfall intensity = 3.901(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area,(total area with modified rational method)(Q=KCIA) is C = 0.880
Subarea runoff = 1.092(CFS) for 0.330(Ac.)
Total runoff = 1.682(CFS)
Effective area this stream = 0.49(Ac.)
Total Study Area (Main Stream No. 2) = 3.86(Ac.)
Area averaged Fm value = 0.088(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 12.000 to Point/Station 13.000 **** PIPEFLOW TRAVEL TIME (Program estimated size) **** ______________________________________________________________________ Upstream point/station elevation = 704.200(Ft.)
Downstream point/station elevation = 702.810(Ft.)
Pipe length = 130.00(Ft.) Manning's N = 0.012
No. of pipes = 1 Required pipe flow = 1.682(CFS)
Nearest computed pipe diameter = 9.00(In.)
Calculated individual pipe flow = 1.682(CFS)
Normal flow depth in pipe = 6.73(In.)
Flow top width inside pipe = 7.82(In.)
Critical Depth = 7.15(In.)
Pipe flow velocity = 4.75(Ft/s)
Travel time through pipe = 0.46 min.
Time of concentration (TC) = 8.87 min.
1655
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 13.000 to Point/Station 13.000 **** SUBAREA FLOW ADDITION **** A-12
______________________________________________________________________ RESIDENTIAL(11+ dwl/acre)
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 56.00
Adjusted SCS curve number for AMC 3 = 75.80
Pervious ratio(Ap) = 0.2000 Max loss rate(Fm)= 0.088(In/Hr) Time of concentration = 8.87 min.
Rainfall intensity = 3.780(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area,(total area with modified rational method)(Q=KCIA) is C = 0.879
Subarea runoff = 0.378(CFS) for 0.130(Ac.)
Total runoff = 2.060(CFS)
Effective area this stream = 0.62(Ac.)
Total Study Area (Main Stream No. 2) = 3.99(Ac.)
Area averaged Fm value = 0.088(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 13.000 to Point/Station 14.000 **** PIPEFLOW TRAVEL TIME (Program estimated size) **** ______________________________________________________________________ Upstream point/station elevation = 702.810(Ft.)
Downstream point/station elevation = 702.560(Ft.)
Pipe length = 50.00(Ft.) Manning's N = 0.012
No. of pipes = 1 Required pipe flow = 2.060(CFS)
Nearest computed pipe diameter = 12.00(In.)
Calculated individual pipe flow = 2.060(CFS)
Normal flow depth in pipe = 7.79(In.)
Flow top width inside pipe = 11.45(In.)
Critical Depth = 7.36(In.)
Pipe flow velocity = 3.82(Ft/s)
Travel time through pipe = 0.22 min.
Time of concentration (TC) = 9.08 min.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 14.000 to Point/Station 14.000 **** CONFLUENCE OF MAIN STREAMS ****
______________________________________________________________________ The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 0.620(Ac.)
Runoff from this stream = 2.060(CFS)
Time of concentration = 9.08 min.
Rainfall intensity = 3.725(In/Hr)
Area averaged loss rate (Fm) = 0.0880(In/Hr)
Area averaged Pervious ratio (Ap) = 0.2000
Summary of stream data:
Stream Flow rate Area TC Fm Rainfall Intensity
No. (CFS) (Ac.) (min) (In/Hr) (In/Hr)
1 12.65 3.370 7.32 0.088 4.238
2 2.06 0.620 9.08 0.088 3.725
Qmax(1) =
1.000 * 1.000 * 12.647) +
1656
1.141 * 0.806 * 2.060) + = 14.542
Qmax(2) =
0.876 * 1.000 * 12.647) +
1.000 * 1.000 * 2.060) + = 13.143
Total of 2 main streams to confluence:
Flow rates before confluence point:
13.647 3.060
Maximum flow rates at confluence using above data:
14.542 13.143
Area of streams before confluence:
3.370 0.620
Effective area values after confluence:
3.870 3.990
Results of confluence:
Total flow rate = 14.542(CFS)
Time of concentration = 7.325 min.
Effective stream area after confluence = 3.870(Ac.)
Study area average Pervious fraction(Ap) = 0.200
Study area average soil loss rate(Fm) = 0.088(In/Hr)
Study area total = 3.99(Ac.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 14.000 to Point/Station 15.000 **** PIPEFLOW TRAVEL TIME (Program estimated size) **** ______________________________________________________________________ Upstream point/station elevation = 702.560(Ft.)
Downstream point/station elevation = 702.000(Ft.)
Pipe length = 80.00(Ft.) Manning's N = 0.012
No. of pipes = 1 Required pipe flow = 14.542(CFS)
Nearest computed pipe diameter = 24.00(In.)
Calculated individual pipe flow = 14.542(CFS)
Normal flow depth in pipe = 14.93(In.)
Flow top width inside pipe = 23.27(In.)
Critical Depth = 16.48(In.)
Pipe flow velocity = 7.08(Ft/s)
Travel time through pipe = 0.19 min.
Time of concentration (TC) = 7.51 min.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 15.000 to Point/Station 15.000 **** SUBAREA FLOW ADDITION **** A-13
______________________________________________________________________ RESIDENTIAL(11+ dwl/acre)
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 56.00
Adjusted SCS curve number for AMC 3 = 75.80
Pervious ratio(Ap) = 0.2000 Max loss rate(Fm)= 0.088(In/Hr) Time of concentration = 7.51 min.
Rainfall intensity = 4.174(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area,(total area with modified rational method)(Q=KCIA) is C = 0.881
Subarea runoff = 0.573(CFS) for 0.240(Ac.)
Total runoff = 15.115(CFS)
Effective area this stream = 4.11(Ac.)
Total Study Area (Main Stream No. 1) = 4.23(Ac.)
1657
Area averaged Fm value = 0.088(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 15.000 to Point/Station 26.000 **** PIPEFLOW TRAVEL TIME (Program estimated size) **** ______________________________________________________________________ Upstream point/station elevation = 702.000(Ft.)
Downstream point/station elevation = 701.870(Ft.)
Pipe length = 26.00(Ft.) Manning's N = 0.012
No. of pipes = 1 Required pipe flow = 15.115(CFS)
Nearest computed pipe diameter = 24.00(In.)
Calculated individual pipe flow = 15.115(CFS)
Normal flow depth in pipe = 17.34(In.)
Flow top width inside pipe = 21.49(In.)
Critical Depth = 16.82(In.)
Pipe flow velocity = 6.22(Ft/s)
Travel time through pipe = 0.07 min.
Time of concentration (TC) = 7.58 min.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 26.000 to Point/Station 26.000 **** CONFLUENCE OF MAIN STREAMS ****
______________________________________________________________________ The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 4.110(Ac.)
Runoff from this stream = 15.115(CFS)
Time of concentration = 7.58 min.
Rainfall intensity = 4.151(In/Hr)
Area averaged loss rate (Fm) = 0.0880(In/Hr)
Area averaged Pervious ratio (Ap) = 0.2000
Program is now starting with Main Stream No. 2
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 16.000 to Point/Station 17.000 **** INITIAL AREA EVALUATION **** A-14
______________________________________________________________________ RESIDENTIAL(11+ dwl/acre)
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 56.00
Adjusted SCS curve number for AMC 3 = 75.80
Pervious ratio(Ap) = 0.2000 Max loss rate(Fm)= 0.088(In/Hr) Initial subarea data:
Initial area flow distance = 235.000(Ft.)
Top (of initial area) elevation = 710.700(Ft.)
Bottom (of initial area) elevation = 707.930(Ft.)
Difference in elevation = 2.770(Ft.)
Slope = 0.01179 s(%)= 1.18
TC = k(0.324)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 6.993 min.
Rainfall intensity = 4.358(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.882 Subarea runoff = 2.306(CFS)
Total initial stream area = 0.600(Ac.)
Pervious area fraction = 0.200
Initial area Fm value = 0.088(In/Hr)
1658
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 17.000 to Point/Station 18.000 **** PIPEFLOW TRAVEL TIME (Program estimated size) **** ______________________________________________________________________ Upstream point/station elevation = 705.500(Ft.)
Downstream point/station elevation = 704.940(Ft.)
Pipe length = 50.00(Ft.) Manning's N = 0.012
No. of pipes = 1 Required pipe flow = 2.306(CFS)
Nearest computed pipe diameter = 12.00(In.)
Calculated individual pipe flow = 2.306(CFS)
Normal flow depth in pipe = 6.45(In.)
Flow top width inside pipe = 11.97(In.)
Critical Depth = 7.79(In.)
Pipe flow velocity = 5.36(Ft/s)
Travel time through pipe = 0.16 min.
Time of concentration (TC) = 7.15 min.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 18.000 to Point/Station 18.000 **** SUBAREA FLOW ADDITION **** A-15
______________________________________________________________________ RESIDENTIAL(11+ dwl/acre)
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 56.00
Adjusted SCS curve number for AMC 3 = 75.80
Pervious ratio(Ap) = 0.2000 Max loss rate(Fm)= 0.088(In/Hr) Time of concentration = 7.15 min.
Rainfall intensity = 4.301(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area,(total area with modified rational method)(Q=KCIA) is C = 0.882
Subarea runoff = 1.258(CFS) for 0.340(Ac.)
Total runoff = 3.564(CFS)
Effective area this stream = 0.94(Ac.)
Total Study Area (Main Stream No. 2) = 5.17(Ac.)
Area averaged Fm value = 0.088(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 18.000 to Point/Station 19.000 **** PIPEFLOW TRAVEL TIME (Program estimated size) **** ______________________________________________________________________ Upstream point/station elevation = 704.940(Ft.)
Downstream point/station elevation = 704.410(Ft.)
Pipe length = 106.00(Ft.) Manning's N = 0.012
No. of pipes = 1 Required pipe flow = 3.564(CFS)
Nearest computed pipe diameter = 15.00(In.)
Calculated individual pipe flow = 3.564(CFS)
Normal flow depth in pipe = 9.42(In.)
Flow top width inside pipe = 14.50(In.)
Critical Depth = 9.15(In.)
Pipe flow velocity = 4.39(Ft/s)
Travel time through pipe = 0.40 min.
Time of concentration (TC) = 7.55 min.
1659
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 19.000 to Point/Station 19.000 **** SUBAREA FLOW ADDITION **** A-16
______________________________________________________________________ RESIDENTIAL(11+ dwl/acre)
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 56.00
Adjusted SCS curve number for AMC 3 = 75.80
Pervious ratio(Ap) = 0.2000 Max loss rate(Fm)= 0.088(In/Hr) Time of concentration = 7.55 min.
Rainfall intensity = 4.162(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area,(total area with modified rational method)(Q=KCIA) is C = 0.881
Subarea runoff = 0.652(CFS) for 0.210(Ac.)
Total runoff = 4.216(CFS)
Effective area this stream = 1.15(Ac.)
Total Study Area (Main Stream No. 2) = 5.38(Ac.)
Area averaged Fm value = 0.088(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 19.000 to Point/Station 20.000 **** PIPEFLOW TRAVEL TIME (Program estimated size) **** ______________________________________________________________________ Upstream point/station elevation = 704.410(Ft.)
Downstream point/station elevation = 704.150(Ft.)
Pipe length = 47.00(Ft.) Manning's N = 0.012
No. of pipes = 1 Required pipe flow = 4.216(CFS)
Nearest computed pipe diameter = 15.00(In.)
Calculated individual pipe flow = 4.216(CFS)
Normal flow depth in pipe = 10.24(In.)
Flow top width inside pipe = 13.96(In.)
Critical Depth = 9.97(In.)
Pipe flow velocity = 4.72(Ft/s)
Travel time through pipe = 0.17 min.
Time of concentration (TC) = 7.72 min.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 20.000 to Point/Station 20.000 **** SUBAREA FLOW ADDITION **** A-17
______________________________________________________________________ RESIDENTIAL(11+ dwl/acre)
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 56.00
Adjusted SCS curve number for AMC 3 = 75.80
Pervious ratio(Ap) = 0.2000 Max loss rate(Fm)= 0.088(In/Hr) Time of concentration = 7.72 min.
Rainfall intensity = 4.108(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area,(total area with modified rational method)(Q=KCIA) is C = 0.881
Subarea runoff = 1.572(CFS) for 0.450(Ac.)
Total runoff = 5.788(CFS)
Effective area this stream = 1.60(Ac.)
Total Study Area (Main Stream No. 2) = 5.83(Ac.)
1660
Area averaged Fm value = 0.088(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 20.000 to Point/Station 21.000 **** PIPEFLOW TRAVEL TIME (Program estimated size) **** ______________________________________________________________________ Upstream point/station elevation = 704.150(Ft.)
Downstream point/station elevation = 703.670(Ft.)
Pipe length = 88.00(Ft.) Manning's N = 0.012
No. of pipes = 1 Required pipe flow = 5.788(CFS)
Nearest computed pipe diameter = 18.00(In.)
Calculated individual pipe flow = 5.788(CFS)
Normal flow depth in pipe = 10.98(In.)
Flow top width inside pipe = 17.56(In.)
Critical Depth = 11.15(In.)
Pipe flow velocity = 5.13(Ft/s)
Travel time through pipe = 0.29 min.
Time of concentration (TC) = 8.00 min.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 21.000 to Point/Station 21.000 **** SUBAREA FLOW ADDITION **** A-18
______________________________________________________________________ RESIDENTIAL(11+ dwl/acre)
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 56.00
Adjusted SCS curve number for AMC 3 = 75.80
Pervious ratio(Ap) = 0.2000 Max loss rate(Fm)= 0.088(In/Hr) Time of concentration = 8.00 min.
Rainfall intensity = 4.019(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area,(total area with modified rational method)(Q=KCIA) is C = 0.880
Subarea runoff = 0.969(CFS) for 0.310(Ac.)
Total runoff = 6.757(CFS)
Effective area this stream = 1.91(Ac.)
Total Study Area (Main Stream No. 2) = 6.14(Ac.)
Area averaged Fm value = 0.088(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 21.000 to Point/Station 22.000 **** PIPEFLOW TRAVEL TIME (Program estimated size) **** ______________________________________________________________________ Upstream point/station elevation = 703.670(Ft.)
Downstream point/station elevation = 703.290(Ft.)
Pipe length = 70.00(Ft.) Manning's N = 0.012
No. of pipes = 1 Required pipe flow = 6.757(CFS)
Nearest computed pipe diameter = 18.00(In.)
Calculated individual pipe flow = 6.757(CFS)
Normal flow depth in pipe = 12.25(In.)
Flow top width inside pipe = 16.79(In.)
Critical Depth = 12.08(In.)
Pipe flow velocity = 5.28(Ft/s)
Travel time through pipe = 0.22 min.
Time of concentration (TC) = 8.22 min.
1661
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 22.000 to Point/Station 22.000 **** SUBAREA FLOW ADDITION **** A-19
______________________________________________________________________ RESIDENTIAL(11+ dwl/acre)
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 56.00
Adjusted SCS curve number for AMC 3 = 75.80
Pervious ratio(Ap) = 0.2000 Max loss rate(Fm)= 0.088(In/Hr) Time of concentration = 8.22 min.
Rainfall intensity = 3.954(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area,(total area with modified rational method)(Q=KCIA) is C = 0.880
Subarea runoff = 0.827(CFS) for 0.270(Ac.)
Total runoff = 7.585(CFS)
Effective area this stream = 2.18(Ac.)
Total Study Area (Main Stream No. 2) = 6.41(Ac.)
Area averaged Fm value = 0.088(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 22.000 to Point/Station 23.000 **** PIPEFLOW TRAVEL TIME (Program estimated size) **** ______________________________________________________________________ Upstream point/station elevation = 703.290(Ft.)
Downstream point/station elevation = 702.930(Ft.)
Pipe length = 66.00(Ft.) Manning's N = 0.012
No. of pipes = 1 Required pipe flow = 7.585(CFS)
Nearest computed pipe diameter = 18.00(In.)
Calculated individual pipe flow = 7.585(CFS)
Normal flow depth in pipe = 13.38(In.)
Flow top width inside pipe = 15.72(In.)
Critical Depth = 12.81(In.)
Pipe flow velocity = 5.38(Ft/s)
Travel time through pipe = 0.20 min.
Time of concentration (TC) = 8.43 min.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 23.000 to Point/Station 23.000 **** SUBAREA FLOW ADDITION **** A-20
______________________________________________________________________ RESIDENTIAL(11+ dwl/acre)
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 56.00
Adjusted SCS curve number for AMC 3 = 75.80
Pervious ratio(Ap) = 0.2000 Max loss rate(Fm)= 0.088(In/Hr) Time of concentration = 8.43 min.
Rainfall intensity = 3.896(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area,(total area with modified rational method)(Q=KCIA) is C = 0.880
Subarea runoff = 0.949(CFS) for 0.310(Ac.)
Total runoff = 8.534(CFS)
Effective area this stream = 2.49(Ac.)
Total Study Area (Main Stream No. 2) = 6.72(Ac.)
Area averaged Fm value = 0.088(In/Hr)
1662
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 23.000 to Point/Station 24.000 **** PIPEFLOW TRAVEL TIME (Program estimated size) **** ______________________________________________________________________ Upstream point/station elevation = 702.930(Ft.)
Downstream point/station elevation = 702.190(Ft.)
Pipe length = 135.00(Ft.) Manning's N = 0.012
No. of pipes = 1 Required pipe flow = 8.534(CFS)
Nearest computed pipe diameter = 21.00(In.)
Calculated individual pipe flow = 8.534(CFS)
Normal flow depth in pipe = 12.60(In.)
Flow top width inside pipe = 20.58(In.)
Critical Depth = 13.01(In.)
Pipe flow velocity = 5.67(Ft/s)
Travel time through pipe = 0.40 min.
Time of concentration (TC) = 8.83 min.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 24.000 to Point/Station 24.000 **** SUBAREA FLOW ADDITION **** A-21
______________________________________________________________________ RESIDENTIAL(11+ dwl/acre)
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 56.00
Adjusted SCS curve number for AMC 3 = 75.80
Pervious ratio(Ap) = 0.2000 Max loss rate(Fm)= 0.088(In/Hr) Time of concentration = 8.83 min.
Rainfall intensity = 3.790(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area,(total area with modified rational method)(Q=KCIA) is C = 0.879
Subarea runoff = 0.462(CFS) for 0.210(Ac.)
Total runoff = 8.995(CFS)
Effective area this stream = 2.70(Ac.)
Total Study Area (Main Stream No. 2) = 6.93(Ac.)
Area averaged Fm value = 0.088(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 24.000 to Point/Station 25.000 **** PIPEFLOW TRAVEL TIME (Program estimated size) **** ______________________________________________________________________ Upstream point/station elevation = 702.190(Ft.)
Downstream point/station elevation = 702.090(Ft.)
Pipe length = 18.00(Ft.) Manning's N = 0.012
No. of pipes = 1 Required pipe flow = 8.995(CFS)
Nearest computed pipe diameter = 21.00(In.)
Calculated individual pipe flow = 8.995(CFS)
Normal flow depth in pipe = 12.98(In.)
Flow top width inside pipe = 20.40(In.)
Critical Depth = 13.37(In.)
Pipe flow velocity = 5.76(Ft/s)
Travel time through pipe = 0.05 min.
Time of concentration (TC) = 8.88 min.
1663
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 25.000 to Point/Station 25.000 **** SUBAREA FLOW ADDITION **** A-22
______________________________________________________________________ RESIDENTIAL(11+ dwl/acre)
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 56.00
Adjusted SCS curve number for AMC 3 = 75.80
Pervious ratio(Ap) = 0.2000 Max loss rate(Fm)= 0.088(In/Hr) Time of concentration = 8.88 min.
Rainfall intensity = 3.776(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area,(total area with modified rational method)(Q=KCIA) is C = 0.879
Subarea runoff = 1.461(CFS) for 0.450(Ac.)
Total runoff = 10.457(CFS)
Effective area this stream = 3.15(Ac.)
Total Study Area (Main Stream No. 2) = 7.38(Ac.)
Area averaged Fm value = 0.088(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 25.000 to Point/Station 26.000 **** PIPEFLOW TRAVEL TIME (Program estimated size) **** ______________________________________________________________________ Upstream point/station elevation = 702.090(Ft.)
Downstream point/station elevation = 701.870(Ft.)
Pipe length = 40.00(Ft.) Manning's N = 0.012
No. of pipes = 1 Required pipe flow = 10.457(CFS)
Nearest computed pipe diameter = 21.00(In.)
Calculated individual pipe flow = 10.457(CFS)
Normal flow depth in pipe = 14.48(In.)
Flow top width inside pipe = 19.43(In.)
Critical Depth = 14.45(In.)
Pipe flow velocity = 5.91(Ft/s)
Travel time through pipe = 0.11 min.
Time of concentration (TC) = 8.99 min.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 26.000 to Point/Station 26.000 **** CONFLUENCE OF MAIN STREAMS ****
______________________________________________________________________ The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 3.150(Ac.)
Runoff from this stream = 10.457(CFS)
Time of concentration = 8.99 min.
Rainfall intensity = 3.748(In/Hr)
Area averaged loss rate (Fm) = 0.0880(In/Hr)
Area averaged Pervious ratio (Ap) = 0.2000
Summary of stream data:
Stream Flow rate Area TC Fm Rainfall Intensity
No. (CFS) (Ac.) (min) (In/Hr) (In/Hr)
1 15.12 4.110 7.58 0.088 4.151
2 10.46 3.150 8.99 0.088 3.748
Qmax(1) =
1664
1.000 * 1.000 * 15.115) +
1.110 * 0.843 * 10.457) + = 24.906
Qmax(2) =
0.901 * 1.000 * 15.115) +
1.000 * 1.000 * 10.457) + = 24.072
Total of 2 main streams to confluence:
Flow rates before confluence point:
16.115 11.457
Maximum flow rates at confluence using above data:
24.906 24.072
Area of streams before confluence:
4.110 3.150
Effective area values after confluence:
6.767 7.260
Results of confluence:
Total flow rate = 24.906(CFS)
Time of concentration = 7.583 min.
Effective stream area after confluence = 6.767(Ac.)
Study area average Pervious fraction(Ap) = 0.200
Study area average soil loss rate(Fm) = 0.088(In/Hr)
Study area total = 7.26(Ac.)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 26.000 to Point/Station 27.000 **** PIPEFLOW TRAVEL TIME (Program estimated size) **** ______________________________________________________________________ Upstream point/station elevation = 701.870(Ft.)
Downstream point/station elevation = 701.720(Ft.)
Pipe length = 80.00(Ft.) Manning's N = 0.012
No. of pipes = 1 Required pipe flow = 24.906(CFS)
Nearest computed pipe diameter = 36.00(In.)
Calculated individual pipe flow = 24.906(CFS)
Normal flow depth in pipe = 24.28(In.)
Flow top width inside pipe = 33.74(In.)
Critical Depth = 19.32(In.)
Pipe flow velocity = 4.91(Ft/s)
Travel time through pipe = 0.27 min.
Time of concentration (TC) = 7.85 min.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 27.000 to Point/Station 27.000 **** SUBAREA FLOW ADDITION **** A-23
______________________________________________________________________ RESIDENTIAL(11+ dwl/acre)
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 56.00
Adjusted SCS curve number for AMC 3 = 75.80
Pervious ratio(Ap) = 0.2000 Max loss rate(Fm)= 0.088(In/Hr) Time of concentration = 7.85 min.
Rainfall intensity = 4.065(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area,(total area with modified rational method)(Q=KCIA) is C = 0.881
Subarea runoff = 0.278(CFS) for 0.270(Ac.)
Total runoff = 25.184(CFS)
Effective area this stream = 7.04(Ac.)
1665
Total Study Area (Main Stream No. 1) = 7.65(Ac.)
Area averaged Fm value = 0.088(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 27.000 to Point/Station 28.000 **** PIPEFLOW TRAVEL TIME (Program estimated size) **** ______________________________________________________________________ Upstream point/station elevation = 701.720(Ft.)
Downstream point/station elevation = 701.380(Ft.)
Pipe length = 68.00(Ft.) Manning's N = 0.012
No. of pipes = 1 Required pipe flow = 25.184(CFS)
Nearest computed pipe diameter = 30.00(In.)
Calculated individual pipe flow = 25.184(CFS)
Normal flow depth in pipe = 20.32(In.)
Flow top width inside pipe = 28.05(In.)
Critical Depth = 20.51(In.)
Pipe flow velocity = 7.11(Ft/s)
Travel time through pipe = 0.16 min.
Time of concentration (TC) = 8.01 min.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 28.000 to Point/Station 28.000 **** SUBAREA FLOW ADDITION **** A-24
______________________________________________________________________ RESIDENTIAL(11+ dwl/acre)
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 56.00
Adjusted SCS curve number for AMC 3 = 75.80
Pervious ratio(Ap) = 0.2000 Max loss rate(Fm)= 0.088(In/Hr) Time of concentration = 8.01 min.
Rainfall intensity = 4.016(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area,(total area with modified rational method)(Q=KCIA) is C = 0.880
Subarea runoff = 2.414(CFS) for 0.770(Ac.)
Total runoff = 27.597(CFS)
Effective area this stream = 7.81(Ac.)
Total Study Area (Main Stream No. 1) = 8.42(Ac.)
Area averaged Fm value = 0.088(In/Hr)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 28.000 to Point/Station 29.000 **** PIPEFLOW TRAVEL TIME (Program estimated size) **** ______________________________________________________________________ Upstream point/station elevation = 701.380(Ft.)
Downstream point/station elevation = 701.080(Ft.)
Pipe length = 56.00(Ft.) Manning's N = 0.012
No. of pipes = 1 Required pipe flow = 27.597(CFS)
Nearest computed pipe diameter = 30.00(In.)
Calculated individual pipe flow = 27.597(CFS)
Normal flow depth in pipe = 21.23(In.)
Flow top width inside pipe = 27.29(In.)
Critical Depth = 21.49(In.)
Pipe flow velocity = 7.44(Ft/s)
Travel time through pipe = 0.13 min.
Time of concentration (TC) = 8.14 min.
End of computations, Total Study Area = 8.42 (Ac.)
The following figures may
1666
be used for a unit hydrograph study of the same area.
Note: These figures do not consider reduced effective area effects caused by confluences in the rational equation.
Area averaged pervious area fraction(Ap) = 0.200
Area averaged SCS curve number = 56.0
1667
San Bernardino County Rational Hydrology Program
(Hydrology Manual Date - August 1986)
CIVILCADD/CIVILDESIGN Engineering Software, (c) 1989-2012 Version 7.2 Rational Hydrology Study Date: 07/18/24
------------------------------------------------------------------------
ESPERANZA - PA II
EUCALYPTUS AVENUE & AMHERST AVENUE, ONTARIO, CALIFORNIA PROPOSED Q 100
2175-906-001
------------------------------------------------------------------------ Program License Serial Number 6293
------------------------------------------------------------------------ ********* Hydrology Study Control Information ********** ------------------------------------------------------------------------ Rational hydrology study storm event year is 100.0
Computed rainfall intensity:
Storm year = 100.00 1 hour rainfall = 1.200 (In.)
Slope used for rainfall intensity curve b = 0.6000
Soil antecedent moisture condition (AMC) = 3
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 20.000 to Point/Station 21.000 **** INITIAL AREA EVALUATION ****B-1
______________________________________________________________________ RESIDENTIAL(11+ dwl/acre)
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 1.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 0.000
SCS curve number for soil(AMC 2) = 56.00
Adjusted SCS curve number for AMC 3 = 75.80
Pervious ratio(Ap) = 0.2000 Max loss rate(Fm)= 0.088(In/Hr) Initial subarea data:
Initial area flow distance = 140.000(Ft.)
Top (of initial area) elevation = 708.080(Ft.)
Bottom (of initial area) elevation = 706.540(Ft.)
Difference in elevation = 1.540(Ft.)
Slope = 0.01100 s(%)= 1.10
TC = k(0.324)*[(length^3)/(elevation change)]^0.2
Initial area time of concentration = 5.764 min.
Rainfall intensity = 4.894(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.884 Subarea runoff = 6.920(CFS)
Total initial stream area = 1.600(Ac.)
Pervious area fraction = 0.200
Initial area Fm value = 0.088(In/Hr)
End of computations, Total Study Area = 1.60 (Ac.)
The following figures may
be used for a unit hydrograph study of the same area.
Note: These figures do not consider reduced effective area effects caused by confluences in the rational equation.
Area averaged pervious area fraction(Ap) = 0.200
Area averaged SCS curve number = 56.0
1668
SECTION 6
CATCH BASIN SIZING
(100-YEAR)
1669
1670
1671
1672
1673
1674
____________________________________________________________________________ ****************************************************************************
HYDRAULIC ELEMENTS - I PROGRAM PACKAGE
(C) Copyright 1982-2014 Advanced Engineering Software (aes) Ver. 21.0 Release Date: 06/01/2014 License ID 1272
Analysis prepared by:
WALDEN & ASSOCIATES
2552 WHITE ROAD, SUITE B
IRVINE, CA 92614
TEL: # 949.660.0110 FAX: # 949.660.0418
---------------------------------------------------------------------------- TIME/DATE OF STUDY: 14:55 07/18/2024
============================================================================ Problem Descriptions:
FOR AREA A-14
**************************************************************************** >>>>SUMP TYPE BASIN INPUT INFORMATION<<<< FOR AREA A-14 ---------------------------------------------------------------------------- Curb Inlet Capacities are approximated based on the Bureau of Public Roads nomograph plots for flowby basins and sump basins.
BASIN INFLOW(CFS) = 2.30
BASIN OPENING(FEET) = 0.33
DEPTH OF WATER(FEET) = 0.32
>>>>CALCULATED ESTIMATED SUMP BASIN WIDTH(FEET) = 4.12 USE 4’ ============================================================================ Problem Descriptions:
FOR AREA A-24
**************************************************************************** >>>>SUMP TYPE BASIN INPUT INFORMATION<<<< FOR AREA A-24 ---------------------------------------------------------------------------- Curb Inlet Capacities are approximated based on the Bureau of Public Roads nomograph plots for flowby basins and sump basins.
BASIN INFLOW(CFS) = 2.41
BASIN OPENING(FEET) = 0.50
DEPTH OF WATER(FEET) = 0.45
>>>>CALCULATED ESTIMATED SUMP BASIN WIDTH(FEET) = 2.59 USE 3’ 1675
SECTION 7
HYDROGRAPH
1676
1677
SECTION 8
ORIFICE CALCULATION
1678
Project Description
Solve For Opening Height
Input Data
Discharge 15.64 ft³/s
Headwater Elevation 697.00 ft
Centroid Elevation 695.50 ft
Tailwater Elevation 692.64 ft
Discharge Coefficient 0.60
Opening Width 2.00 ft
Opening Height 1.33 ft
Cross Section Image
Cross Section for Rectangular Orifice
3/18/2025 9:55:15 AM
Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster V8i (SELECTseries 1) [08.11.01.03] 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 1 Page 1 of 1679
Project Description
Solve For Opening Height
Input Data
Discharge 15.64 ft³/s
Headwater Elevation 697.00 ft
Centroid Elevation 695.50 ft
Tailwater Elevation 692.64 ft
Discharge Coefficient 0.60
Opening Width 2.00 ft
Results
Opening Height 1.33 ft
Headwater Height Above Centroid 1.50 ft
Tailwater Height Above Centroid -2.86 ft
Flow Area 2.65 ft²
Velocity 5.89 ft/s
Worksheet for Rectangular Orifice
3/18/2025 9:56:04 AM
Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster V8i (SELECTseries 1) [08.11.01.03] 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 1 Page 1 of 1680
SECTION 10
APPENDIX
1681
1682
1 2
3 5 4
6 7
89 14
15 26
27 28
10 11
12 13
16 17
18 20
19 21
22 23
24 25
29 9.5
AMHERST AVENUE
EUCALYPTUS AVENUE
CLIFTON AVENUE
CHATHAM STREET
SHELBURNE STREET
LEGEND:
SHEET
CHECKED:DRAWN:DATE:
JOB NUMBER
OF 2552 WHITE ROAD, SUITE B, IRVINE, CA 92614 (949) 660-0110 FAX: 660-0418
LAND SURVEYORS
PLANNERS
CIVIL ENGINEERS ALDEN &
SSOCIATES
HYDROLOGY MAP - PROPOSED
FOR
2175-996-001
04/2025
SK
MP
1 ESPERANZA - PA II
EUCALYPTUS AVENUE & AMHERST AVENUE
ONTARIO, CALIFORNIA
1 1683
1684
1 Preliminary Water Quality Management Plan
(PWQMP)
For compliance with Santa Ana Regional Water Quality Control Board Order Number R8-2010-0036 (NPDES Permit No. CAS618036)
Submittal Date:
Project Name:
Ontario Project #:
Applicant Name:
Applicant Address:
Project Address:
Project Size (acres):
Project Description:
Engineering Department
1685
2 Preliminary Water Quality Management Plan (PWQMP)
1. Introduction
The Preliminary Water Quality Management Plan (PWQMP) is a planning tool to improve integration of required water quality elements, stormwater management, water conservation, rainwater harvesting and re-use, and flood management in land use planning and the City’s development process. The Preliminary WQMP will assist project applicants and planners in properly designing and laying out project sites so that water quality may be incorporated in the most effective manner and at the lowest cost for the developer.
The San Bernardino County Municipal Separate Storm Sewer System Permit (MS4 Permit) requires project-specific Water Quality Management plans (WQMP) to be prepared for all priority new development and significant redevelopment projects listed in Section 2 of this document. The MS4 Permit stipulates that the City of Ontario require priority project applicants to submit a Preliminary project-specific WQMP, as early as possible, during the environmental review or planning phase of a development project and that the Preliminary WQMP be approved prior to the issuance of land use entitlement.
2. Priority Projects (requiring a Preliminary WQMP)
Land Use entitlement shall not be issued for any of the listed projects, below, until a Preliminary WQMP has been approved by the City’s Engineering Department. For construction projects not going through entitlement, a Preliminary and Final project specific WQMP shall be approved, prior to the issuance of construction permits:
Check the appropriate project category below, for this project:
Check
below Project Categories
1. All significant re-development projects. Significant re-development is defined as the addition or replacement of 5,000 or more square feet of impervious surface on an already developed site subject to discretionary approval of the Permittee. Redevelopment does not include routine maintenance activities that are conducted to maintain original line and grade, hydraulic capacity, original purpose of the facility, or emergency redevelopment activity required to protect public health and safety. Where redevelopment results in an increase of less than fifty percent of the impervious surfaces of a previously existing developed site, and the existing development was not subject to WQMP requirements, the numeric sizing criteria discussed below applies only to the addition or replacement, and not to the entire developed site. Where redevelopment results in an increase of fifty percent or more of the impervious surfaces of a previously existing developed site, the numeric sizing criteria applies to the entire development (new and existing).
2. New development projects that create 10,000 square feet or more of impervious surface (collectively over the entire project site) including commercial, industrial, residential housing subdivisions (i.e., detached single family home subdivisions, multi-family attached subdivisions or townhomes, condominiums, apartments, etc.), mixed-use, and public projects. This category includes development projects on public and private land, which fall under the planning and building authority of the permitting agency. 1686
3 Check
below Project Categories
3. Automotive repair shops (with SIC codes 5013, 5014, 5541, 7532- 7534, 7536-7539).
4. Restaurants and Food Service Establishments where the land area of development is 5,000 square feet or more.
5. Developments of 2,500 square feet of impervious surface or more adjacent to (within 200 feet) or discharging directly into environmentally sensitive areas (ESA’s) such as areas designated in the Ocean Plan as areas of special biological significance or waterbodies listed on the CWA Section 303(d) list of impaired waters.
6. Parking lots of 5,000 square feet or more exposed to storm water. Parking lot is defined as land area or facility for the temporary storage of motor vehicles.
7. Retail Gasoline Outlets (RGOs) that are either 5,000 sq ft or more or have a projected average daily traffic of 100 or more vehicles per day.
8. *This project is not covered under any of the categories listed above. * If the development is not covered under any of the project categories listed in Section 2, the project is not required to design and install Site Design/LID BMPs or Treatment Control BMPs to treat the design storm event (Design Capture Volume) described in Section 4.
3. Preliminary WQMP Objectives
Through a combination of Site Design/LID BMPs (where feasible), Source Control, and/or Treatment Control BMPs, project-specific WQMPs shall address all identified pollutants and hydrologic conditions of concern from new development and significant re-development projects for the categories of projects (priority projects) listed in Section 2. Under each type of BMP, listed below, please indicate which BMPs are planned to be implemented and included in the Final WQMP for the project:
A. Site Design/LID (Low Impact Design) for Reducing Stormwater Runoff:
The MS4 Permit requires each priority development project to infiltrate, harvest and use, evapotranspire, or bio-treat the runoff from a 2-yr, 24-hour storm event (Design Capture Volume). If site conditions do not permit infiltration, harvest and use, evapotranspiration, and/or bio-treatment of the entire Design Capture Volume, at the project site, Site Design/LID techniques are required to be implemented to the Maximum Extent Practicable, at the project site, and the remainder of the DCV shall be infiltrated, harvested, bio-treated or treated by alternative measures. Project applicants shall submit a Preliminary WQMP that documents the LID/Site Design BMPs, proposed for the project. Please indicate, in the table below, which Site Design/LID BMPs will be utilized on this project to accomplish this requirement:
1687
4 Site Design/LID Practice Planned Not
Planned
Provide at least the minimum effective area required for LID BMPs, to comply with the WQMP (see Table 3-1 below).
Grade parking lot areas/drive aisles/roof drains to sheet flow runoff into landscaped swales, via curb cuts or zero-face curbs or otherwise disconnect direct drainage from MS4.
Design landscaped areas as swales and grade to accept
runoff from building roofs, parking lots and project roadways.
Install surface retention basins or infiltration trenches to receive impervious area runoff.
Install pervious pavement in parking stalls, alleys, driveways, gutters, walkways, trails or patios.
Install underground stormwater retention chambers where downstream landscaped areas are limited.
Install approved Stormwater Drywells in detention areas.
Construct streets, sidewalks, and parking lot stalls to the minimum widths necessary.
Install on-site Biotreatment basins/trenches with underdrains, where soil type is poorly draining.
Install “Engineered Soil” to increase uptake/soil storage capacity and/or evapotranspiration.
Install Rainwater Harvesting/Use Equipment.
Regional LID BMP facilities are installed, off-site, with the capacity and conveyances to accept post-development storm water runoff from this project and reserved capacity allocation credits have been assigned to the project, in a Certificate or other legally binding document, attached herein
Table 3-1 Minimum Effective Area1 Required for LID BMPs (surface + subsurface facilities) for Project WQMP to Demonstrate Infeasibility2 (% of site) Project Type New
Development
ReDevelopment
SF/MF Residential < 7 du/ac 10% 5%
SF/MF Residential < 7 - 18 du/ac 7% 3.5%
SF/MF Residential > 18 du/ac 5% 2.5%
Mixed Use, Commercial/Industrial w/FAR< 1.0 10% 5%
Mixed Use, Commercial/Industrial w/FAR 1.0-2.0 7% 3.5%
Mixed Use, Commercial/Industrial w/FAR> 2.0 5% 2.5%
Podium (parking under > 75% of project) 3% 1.5%
Zoning allowing development to property lines 2% 1%
Transit Oriented Development3 5% 2.5%
Parking 5% 2.5%
1688
5 1 “Effective area” is defined as land area which 1) is suitable for a retention/infiltration BMP (based on infeasibility criteria) and 2) is located down-gradient from building roof or paved areas, so that it may receive gravity flow runoff.
2 Criteria only required if the project WQMP seeks to demonstrate that the full DCV cannot be feasibly managed on-site.
3 Transit oriented development is defined as a project with development center within one half mile of a mass transit center.
Key: du/ac = dwelling units/acre, FAR = Floor Area Ratio = ratio of gross floor area of building to gross lot area, MF = Multi Family, SF = Single Family B. Source Control BMPs – The following BMPs are designed to control stormwater pollutants and runoff water at the location where it is generated. Please indicate which of the listed BMPs are planned to be implemented for the project:
Source Control BMPs Planned Not
Planned
Minimize non-stormwater site runoff through efficient
irrigation system design and controllers.
Minimize trash and debris in storm runoff through a regular parking lot, storage yard and roadway sweeping program.
Provide proper covers/roofs and secondary containment for outside material storage & work areas.
Provide solid roofs over all trash enclosures.
Site Owner(s)/Property Manager/HOA or POA will be
familiar with the project WQMP and stormwater BMPs.
Owner or HOA or POA to provide Education/Training of site occupants and employees on stormwater BMPs.
Install stormwater placards/stenciled messages with a “No Dumping” message on all on-site/off-site storm drain inlets.
Provide contained equipment/vehicle wash rack areas that discharge to sanitary sewer.
C. Treatment Control BMPs – The following BMPs are designed to control stormwater pollutants where it is not feasible to install on-site or off-site Site Design/LID BMPs, with the requisite capacity to treat the Design Capture Volume for identified Pollutants of Concern or where pretreatment of stormwater runoff is required, ahead of infiltration BMPs. Please indicate which of the listed BMPs are planned to be implemented for the project:
Treatment Control BMP Planned Not
Planned
Gravity Separator devices for pretreatment of sediment, trash/litter or Oil & Grease
Proprietary Biofiltration vaults/devices
Media Cartridge Filtration Vaults
Proprietary Filter Inserts for on-site storm drain inlets or retention basin/trench overflow drains
1689
6 4. Volume-based calculation (approximate) for sizing on-site or off-site Stormwater Retention/Infiltration, Harvest & Re-Use or Biotreatment facilities 1) After calculating the “Watershed Imperviousness Ratio”, i, which is equal to the percent of impervious area in each Drainage Management Area, divided by 100, calculate the composite runoff coefficient CBMP for the Drainage Area above using the following equation:
3 2
CBMP = 0.858i – 0.78i + 0.774i + 0.04
where: CBMP = composite runoff coefficient; and,
i = watershed imperviousness ratio.
3) Determine the area-averaged “6-hour Mean Storm Rainfall”, P6, for the Drainage Area.
This is calculated by multiplying the area averaged 2-year 1-hour value (0.5”-0.6”) by the appropriate regression coefficient (1.4807). The 2-yr, 1-hr value for southern Ontario is approximately to 0.5” (P6 = 0.5*1.4807 = 0.74 and northern Ontario is approximately 0.6” in/hr (P6 = 0.6*1.4807 = 0.89).
4) Determine the appropriate drawdown time. Use the regression constant a = 1.582 for 24 hours and a = 1.963 for 48 hours. Note: Regression constants are provided for both 24 hour and 48-hour drawdown times; however, 48-hour drawdown times should be used in most areas of California. Drawdown times in excess of 48 hours should be used with caution as vector breeding can be a problem after water has stood in excess of 72 hours. (Use of the 24-hour drawdown time should be limited to drainage areas with coarse soils (Class ‘A’ soils that readily drain.) 5) Calculate the “Maximized Detention Volume”, P0, using the following equation:
P0 = a · CBMP · P6
where: P0 = Maximized Detention Volume, in inches
a = 1.582 for 24 hour and a = 1.963 for 48-hour drawdown, CBMP = composite runoff coefficient; and,
P6 = 6-hour Mean Storm Rainfall, in inches
6) Calculate the “Target Capture Volume”, V0, using the following equation:
V0 = (P0 · A) / 12
where: V0 = Target Capture Volume, in acre-feet
P0 = Maximized Detention Volume, in inches; and,
A = BMP Drainage Area, in acres
1690
7 Project Volume-based calculation (approximate) for planned on-site or off-site Stormwater Retention/Infiltration, Harvest & Re-Use or Biotreatment facilities:
Variable Factor/Formula DA1,
DMA A
DA1
DMA B
DA2
DMA A
DA2
DMA B
Impervious
surface/total
surface, ratio
(i)
CBMP= runoff
coefficient
3 2
0.858i –0.78i +0.774i+
0.04 P6 **P6 = 2-yr,1-hr
depth*1.4807 =
Detention Volume
(acre inches)
P0 = a * CBMP * P6 =
Drawdown rate of
basin/trench (a)
1.963 for 48-hr
drawdown =
Project Total Area
(acre)
(A)
Design Capture
Volume in cu. ft.
V0 = [(P0 * A)/12]
*43560 =
Retention Volume Retention capacity of
provided in cubic basins, trenches,
feet. underground storage or
biotreatment basin
**For P6 value, use site coordinates and NOAA website to determine project’s average 2-yr, 1-hr rainfall depth, at: http://hdsc.nws.noaa.gov/hdsc/pfds/sa/sca_pfds.html .
5. Flow-Based calculation (approximate) for sizing on-site or off-site Biotreatment facilities and proprietary treatment technology BMPs:
1) After calculating the “Watershed Imperviousness Ratio”, i, which is equal to the percent of impervious area in each Drainage Management Area divided by 100, calculate the composite runoff coefficient CBMP for the Drainage Area above using the following equation:
3 2
CBMP = 0.858i – 0.78i + 0.774i + 0.04
where: CBMP = composite runoff coefficient; and,
i = watershed imperviousness ratio.
1691
8 2) Determine BMP design rainfall intensity, IBMP, using the project site geo-coordinates and the NOAA website to determine project’s average 2-yr, 1-hr rainfall intensity, at:
http://hdsc.nws.noaa.gov/hdsc/pfds/sa/sca_pfds.html .Multiply this value by 0.2787 (regression coefficient for Ontario) and a minimum safety factor of 2. 4) Calculate the target BMP flowrate, Q, using the following formula (for each DMA <50 acres*):
Q = CBMP · IBMP · A
Where: Q = flow in cfs (Cubic feet per second)
IBMP = BMP design rainfall intensity, in/hr
A = Drainage Area in acres
*For DMAs >50 acres, with CBMP <0.5, the project applicant shall use the unit hydrograph method specified in the San Bernardino County Hydrology Manual, using the design storm pattern with rainfall return frequency such that the peak 1-hr rainfall intensity equals the 85th percentile 1-hr rainfall, multiplied by 2.
Project Flow-based calculation (approximate) for planned on-site or off-site flow-based Biotreatment facilities or Stormwater Treatment BMPs:
Variable Factor/Formula DA1
DMA A
DA1
DMA B
DA2
DMA A
DA2
DMA B
Impervious surface/
total surface, ratio
(i)
CBMP= composite
runoff coefficient
3 2
0.858i +0.78i +0.774i
+0.04
IBMP IBMP = 2-yr,1-hr storm
intensity*0.2787*safety
factor
Drainage area (ac) A = DMA sq ft/43,560
Target BMP flowrate Q = CBPM* IBMP * A
6. Hydrologic Conditions of Concern (HCOC) and use of the on-line San Bernardino County HCOC Map for determining necessary mitigation steps necessary if there are HCOCs downstream of a project:
Project applicants may access the on-line HCOC Map at:
http://permitrack.sbcounty.gov/WAP/. The map will indicate any hydrology concerns with downstream waterways that are hydraulically connected to the project and will indicate if there are any approved regional projects downstream that could be utilized for off-site mitigation of HCOCs. Please indicate here if the project will or will not be able to retain/infilter, harvest and use or biotreat and detain the DCV, on-site, as calculated in Section 4 and if there are HCOCs identified downstream of the project:
1692
9 Retain or Harvest/Use the DCV on site? Yes No
Biotreat the DCV but not infilter the runoff? Yes No
HCOCs identified downstream of site? Yes No
If the entire DCV will not be retained on site, the DCV is biotreated but not infiltered or additional detention capacity is needed to address identified HCOCs, downstream of the site, please list here, what additional mitigation measures will be utilized (on-site or off-site) to address HCOCs (see Section 4.2.1-4.2.3 of the SB County WQMP Technical Guidance):
7. Site Plan and Conceptual Grading/Drainage Plan requirements for submission with the Preliminary WQMP:
Provide a Site Plan and Conceptual Grading/Drainage Plan along with this Preliminary WQMP, which conceptually shows the proposed locations of buildings, homes, parking lots, parks, new paved roadways, landscaped areas, drainage patterns and drainage sub-areas, methods of conveyance, proposed retention/infiltration, harvest & use or biotreatment facilities that are planned for installation. Where it is determined to be infeasible to capture and detain design storm runoff volumes, on-site, please include other design features, as described in Section 3, above. Include numbered or lettered notes on the Site Plan with a legend detailing other BMPs, as described in Section 3.
8. BMP Maintenance and Funding Mechanism & Description:
9. Acknowledgment:
As the property owner or developer, I understand that this project is required to install and implement permanent LID Storm Water Best Management Practices pursuant to the requirements of the San Bernardino County MS4 Permit and to document those BMPs in the submittal of a Water Quality Management Plan, which is binding on any current or successive owners of this property.
10.Exemption Signature:
As the property owner or developer, I understand that this project is not required by the San Bernardino County MS4 Permit to install and implement permanent LID Storm Water Best Management Practices and will not be required to submit a Water Quality Management Plan.
Signature of Owner or Developer Date
Yes No
1693
AMHERST AVENUE
EUCALYPTUS AVENUE
CLIFTON AVENUE
CHATHAM STREET
PROPOSED BUILDING 15
PROPOSED BUILDING 4
PROPOSED BUILDING 25PROPOSED BUILDING 24
BUILDING 26
PROPOSED BUILDING 23
PROPOSED BUILDING 22
PROPOSED BUILDING 21
PROPOSED BUILDING 20
PROPOSED BUILDING 19
PROPOSED BUILDING 18
PROPOSED BUILDING 17
PROPOSED BUILDING 28
PROPOSED BUILDING 1
PROPOSED BUILDING 2
PROPOSED BUILDING 16
PROPOSED BUILDING 14
PROPOSED BUILDING 13
PROPOSED BUILDING 12
PROPOSED BUILDING 11
PROPOSED BUILDING 10
PROPOSED BUILDING 9
PROPOSED BUILDING 8
PROPOSED BUILDING 7
PROPOSED BUILDING 6
PROPOSED BUILDING 5
PROPOSED BUILDING 3 PROPOSED BUILDING 27 PROPOSED
WATER QUALITY MANAGEMENT PLAN
ONTARIO, CA
ESPERANZA TOWNHOMES
EUCALYPTUS AVE. & AMHERST AVE.
Catch Basin Stenciling
Drainage Pattern
LEGEND
Denotes Drainage Area Boundary
Trash EnclosurePrivate Landscape DesignPublic Landscape Design 1694
CITY OF ONTARIO
MEMORANDUM
TO: Rudy Zeledon, PLANNING DEPARTMENT
Mike Eskander, ENGINEERING DEPARTMENT
FROM: Steve Wilson
DATE: November 16, 2006
SUBJECT: File No. PMTT06-056 (TT 18380) -Esperanza Specific Plan area “A” Map X The “A” Maps for these tracts are approved. Prior to DAB approval of the “B” Maps for these tracts, the following items must be included in the Tentative Tract Maps and resubmitted to Engineering:
1. The Tract Map “B” Map submittals for these tracts must conceptually address the use of the regional wetlands in the ultimate condition as well as interim conditions to comply with the water quality requirements for all new development in the Regional Water Quality Management Plan (WQMP). All stormwater runoff pollutants not adequately addressed by on-site Source Control and Site design BMPs or off-site treatment controls must be addressed by on-site Treatment BMPs.
2. Interim on-site treatment control BMPs to address water quality, until such time that the regional wetlands are constructed and operational, are required to be to be shown on the Tract Map/Drainage Plan for this tract or on other tracts within this same project that would be slated for interim treatment BMPs and would receive drainage from this tract. Tentative Tract Map approval will not be granted until this is addressed.
Note: Each landowner/developer in the Esperanza project will be conditioned in the Engineering DAB Report, to prepare and submit one Water Quality Management Plan (WQMP), along with separate Grading Plans, for all of the tracts being developed by that owner. The model WQMP form is available at: www.swrcb.ca.gov/rwqcb8/html/sb_wqmp.html The WQMP shall identify and detail all appropriate site design, source control and treatment control BMPs to be implemented or installed in this development project in order to reduce storm water pollutants and site runoff. You may also request a revised copy of the WQMP document, and the Standard Erosion & Sediment Control Notes for the Grading Plans from me by emailing a request to:
[email protected] . Please direct all questions to Mr. Steve Wilson at (909)395-2389. 1695
CITY OF ONTARIO
MEMORANDUM
Development Plan Review
Project: Esperanza Specific Plan PA-11 Date: March 7, 2024 Location: NEC of Clifton Ave and Eucalyptus Ave By: Diego Tapia The following comments on the subject project are provided for the benefit of City Engineering and Planning staff and the Applicant. These are not the conditions of approval which will be submitted under separate cover.
Preliminary Comments:
1. A Traffic Impact Analysis must be submitted that supports the Applicant/Developer’s proposed land use change and evaluates potential project traffic impacts. Additional comments may be provided once the Traffic Impact Analysis review is complete.
2. The previous site plan had the tract entrance being proposed on Amherst Avenue, currently it’s now being proposed on Clifton Avenue. Please restore the tract entrance onto Amherst Avenue and align the centerline of the tract entry with Shelburne Street. Chokers shall also be installed on the east side of the intersection on Amherst Avenue at tract entrance per City of Ontario Standard Drawing No. 1110. Our intent is that by having the tract entrance on Amherst Avenue with chokers, speeding along the straightaway segment of Amherst Avenue will be reduced.
3. The Applicant/Developer shall align the proposed tract entry onto Chatham Street with Ventura Avenue (existing tract entrance).
4. Install choker, ramp and crosswalk on Chatham Street east of Ventura Avenue and appropriate parking restrictions for sight distance.
5. Remove on-street parking stall markings from site plans.
6. The Applicant/Developer shall install ADA ramps for pedestrian crossings at the following locations per City of Ontario Standard Drawing No. 1213. a. Southwest corner of Chatham Street and Clifton Avenue b. Southeast corner of Chatham Street and Amherst Avenue
7. The Applicant/Developer shall be responsible to design and construct street improvements along property frontages of Eucalyptus Avenue, Amherst Avenue, Chatham Street, and Clifton Avenue in accordance with conditions issued by City’s Land Development Division. 1696
These, and all other street improvements required herein, shall include, but not be limited to, concrete curb and gutter, sidewalk, LED streetlights, signing and striping, and parkway landscaping.
8. The Applicant/Developer shall be responsible to design and construct intersection choker on the southeast corner of Amherst Avenue and Chatham Street per City of Ontario Standard Drawing No. 1110.
9. Existing parking restrictions along Eucalyptus Avenue shall remain in place.
10. All landscaping, block walls, and other obstructions shall be compatible with the stopping sight distance requirements per City of Ontario Standard Drawing No. 1309. dt;
1697
1698
Esperanza Specific Plan
Amendment
NOISE IMPACT ANALYSIS
CITY OF ONTARIO
PREPARED BY:
Bill Maddux, INCE
[email protected]
(619) 778-1971
APRIL 24, 2025
15662-06 Noise Study.docx
1699
1700
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
i
TABLE OF CONTENTS
TABLE OF CONTENTS ............................................................................................................................. I APPENDICES ......................................................................................................................................... II LIST OF EXHIBITS .................................................................................................................................. II LIST OF TABLES ................................................................................................................................... III LIST OF ABBREVIATED TERMS ............................................................................................................. III EXECUTIVE SUMMARY ......................................................................................................................... 1 1 INTRODUCTION ........................................................................................................................... 3
1.1 Site Location .................................................................................................................................. 3
1.2 Project Description ........................................................................................................................ 3 2 FUNDAMENTALS ......................................................................................................................... 7
2.1 Range of Noise .............................................................................................................................. 7
2.2 Noise Descriptors .......................................................................................................................... 8
2.3 Sound Propagation ........................................................................................................................ 8
2.4 Noise Control ................................................................................................................................ 9
2.5 Noise Barrier Attenuation ............................................................................................................. 9
2.6 Land Use Compatibility With Noise .............................................................................................. 9
2.7 Community Response to Noise ................................................................................................... 10
2.8 Vibration ..................................................................................................................................... 11 3 REGULATORY SETTING .............................................................................................................. 13
3.1 State of California Noise Requirements ...................................................................................... 13
3.2 City of Ontario General Plan ....................................................................................................... 13
3.3 Operational Noise Standards ...................................................................................................... 15
3.4 Construction Noise Standards..................................................................................................... 15
3.5 Vibration Standards .................................................................................................................... 16
3.6 Airport Land Use Compatibility ................................................................................................... 16 4 SIGNIFICANCE CRITERIA ............................................................................................................ 19
4.1 Noise Level Increases (Threshold A) ........................................................................................... 19
4.2 Vibration (Threshold B) ............................................................................................................... 20
4.3 CEQA Guidelines Not Further Analyzed (Threshold C) ............................................................... 20
4.4 Significance Criteria Summary .................................................................................................... 21 5 EXISTING NOISE LEVEL MEASUREMENTS ................................................................................... 23
5.1 Measurement Procedure and Criteria ........................................................................................ 23
5.2 Noise Measurement Locations ................................................................................................... 23
5.3 Noise Measurement Results ....................................................................................................... 25 6 METHODS AND PROCEDURES.................................................................................................... 27
6.1 FHWA Traffic Noise Prediction Model ........................................................................................ 27
6.2 On-Site Traffic Noise Prediction Model Inputs ........................................................................... 27
6.3 Traffic Noise Prediction Model Inputs ........................................................................................ 27 7 OFF-SITE TRAFFIC NOISE ANALYSIS ............................................................................................ 29 8 ON-SITE TRAFFIC NOISE ANALYSIS ............................................................................................. 31
8.1 Exterior Noise Analysis ................................................................................................................ 31
8.2 Interior Noise Analysis ................................................................................................................ 32 1701
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
ii
9 RECEIVER LOCATIONS................................................................................................................ 37 10 OPERATIONAL NOISE ANALYSIS ................................................................................................ 39
10.1 Operational Noise Sources .......................................................................................................... 39
10.2 Reference Noise Levels ............................................................................................................... 41
10.3 CadnaA Noise Prediction Model ................................................................................................. 42
10.4 Project Operational Noise Levels ................................................................................................ 42
10.5 Project Operational Noise Level Compliance .............................................................................. 43
10.6 Project Operational Noise Level Increases ................................................................................. 44 11 CONSTRUCTION ANALYSIS ........................................................................................................ 46
11.1 Construction Noise Levels ........................................................................................................... 47
11.2 Construction Reference Noise Levels ......................................................................................... 47
11.3 Construction Noise Analysis ........................................................................................................ 49
11.4 Construction Noise Level Compliance ........................................................................................ 50
11.5 Construction Vibration Analysis .................................................................................................. 51 12 REFERENCES .............................................................................................................................. 53 13 CERTIFICATIONS ........................................................................................................................ 55
APPENDICES
APPENDIX 3.1: CITY OF ONTARIO COUNTY CODE
APPENDIX 5.1: STUDY AREA PHOTOS
APPENDIX 5.2: NOISE LEVEL MEASUREMENTS
APPENDIX 8.1: ON-SITE MODEL INPUTS
APPENDIX 10.1: HVAC MANUFACTURES SPECIFICATIONS
APPENDIX 10.2: CADNAA OPERATION NOISE MODEL INPUTS
APPENDIX 11.1: CADNAA CONSTRUCTION NOISE MODEL INPUTS
LIST OF EXHIBITS
EXHIBIT 1-A: LOCATION MAP ............................................................................................................... 4 EXHIBIT 1-B: LAND USE PLAN ............................................................................................................... 5 EXHIBIT 1-C: PROJECT SITE PLAN .......................................................................................................... 6 EXHIBIT 2-A: TYPICAL NOISE LEVELS ..................................................................................................... 7 EXHIBIT 2-B: NOISE LEVEL INCREASE PERCEPTION .............................................................................. 10 EXHIBIT 2-C: TYPICAL LEVELS OF GROUND-BORNE VIBRATION ........................................................... 12 EXHIBIT 3-A: NOISE LEVEL EXPOSURE AND LAND USE COMPATIBILITY GUIDELINES ............................ 14 EXHIBIT 3-B: ONT AIRPORT NOISE LEVEL CONTOURS .......................................................................... 17 EXHIBIT 3-C: CHINO AIRPORT NOISE LEVEL CONTOURS ...................................................................... 18 EXHIBIT 5-A: AMBIENT NOISE MEASUREMENT LOCATIONS ................................................................ 24 EXHIBIT 9-A: RECEIVER LOCATIONS .................................................................................................... 38 EXHIBIT 10-A: OPERATIONAL NOISE SOURCE LOCATIONS ................................................................... 40 EXHIBIT 11-A: CONSTRUCTION NOISE SOURCE LOCATIONS ................................................................ 48
1702
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
iii
LIST OF TABLES
TABLE ES-1: SUMMARY OF CEQA SIGNIFICANCE FINDINGS ................................................................... 1 TABLE 3-1: OPERATIONAL NOISE STANDARDS .................................................................................... 15 TABLE 4-1: SIGNIFICANCE CRITERIA SUMMARY .................................................................................. 21 TABLE 5-1: NOISE LEVEL MEASUREMENT SUMMARY .......................................................................... 25 TABLE 6-1: ON-SITE ROADWAY PARAMETERS .................................................................................... 27 TABLE 6-2: TIME OF DAY VEHICLE SPLITS ............................................................................................ 28 TABLE 6-3: DISTRIBUTION OF TRAFFIC FLOW BY VEHICLE TYPE (VEHICLE MIX) .................................... 28 TABLE 8-1: EXTERIOR NOISE LEVELS ................................................................................................... 31 TABLE 8-2: FIRST-FLOOR INTERIOR NOISE LEVELS (CNEL) .................................................................... 33 TABLE 8-3: SECOND-FLOOR INTERIOR NOISE LEVELS (CNEL) ............................................................... 34 TABLE 8-4: THIRD-FLOOR INTERIOR NOISE LEVELS (CNEL) ................................................................... 35 TABLE 10-1: REFERENCE NOISE LEVELS ............................................................................................... 42 TABLE 10-2: PROJECT DAYTIME OPERATIONAL NOISE LEVELS ............................................................. 43 TABLE 10-3: PROJECT NIGHTTIME OPERATIONAL NOISE LEVELS ......................................................... 43 TABLE 10-4: OPERATIONAL NOISE LEVEL COMPLIANCE ...................................................................... 44 TABLE 10-5: DAYTIME PROJECT OPERATIONAL NOISE LEVEL INCREASES ............................................. 45 TABLE 10-6: NIGHTTIME OPERATIONAL NOISE LEVEL INCREASES ....................................................... 45 TABLE 11-1: CONSTRUCTION REFERENCE NOISE LEVELS ..................................................................... 49 TABLE 11-2: CONSTRUCTION EQUIPMENT NOISE LEVEL SUMMARY .................................................... 50 TABLE 11-3: CONSTRUCTION NOISE LEVEL COMPLIANCE .................................................................... 50 TABLE 11-4: VIBRATION SOURCE LEVELS FOR CONSTRUCTION EQUIPMENT ....................................... 51 TABLE 11-5: PROJECT CONSTRUCTION VIBRATION LEVELS.................................................................. 52
LIST OF ABBREVIATED TERMS
(1) Reference
ADT Average Daily Traffic
ANSI American National Standards Institute
CEQA California Environmental Quality Act
CNEL Community Noise Equivalent Level
dBA A-weighted decibels
EPA Environmental Protection Agency
ESP Esperanza Specific Plan
FHWA Federal Highway Administration
FTA Federal Transit Administration
Hz Hertz
Leq Equivalent continuous (average) sound level
Lmax Maximum level measured over the time interval
Lmin Minimum level measured over the time interval
OPR Office of Planning and Research
PPV Peak particle velocity
Project Esperanza Specific Plan Amendment
REMEL Reference Energy Mean Emission Level
RMS Root-mean-square
VdB Vibration Decibels
1703
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
iv
This page was intentionally left blank.
1704
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
1 EXECUTIVE SUMMARY
Urban Crossroads, Inc. has prepared this noise study to determine the noise exposure and the necessary noise mitigation measures for the Esperanza Specific Plan Amendment (“Project”).
The Project is located within the Esperanza Specific Plan. The original Specific Plan that was approved contemplated a 736-student elementary school within Planning Area 11. It is our understanding that the Project is to consist of 161 multifamily residential dwelling units (with a density of approximately 16.1 dwelling units per net acre). This noise study has been prepared to satisfy the applicable City of Ontario noise standards and significance criteria based on Appendix G of the California Environmental Quality Act (CEQA) Guidelines. (1) The results of this Noise Impact Analysis are summarized below based on the significance criteria in Section 4 of this report, consistent with Appendix G of the California Environmental Quality Act (CEQA) Guidelines. (1) Table ES-1 shows the findings of significance for each potential noise and/or vibration impact under CEQA before and after any required mitigation measures.
TABLE ES-1: SUMMARY OF CEQA SIGNIFICANCE FINDINGS
Analysis Report
Section
Significance Findings
Unmitigated Mitigated
Off-Site Traffic Noise 7 Less Than Significant -
On-Site Traffic Noise 8 --1 --1
Operational Noise 10 Less Than Significant -
Construction Noise
11 Less Than Significant -
Construction Vibration Less Than Significant - 1
Impacts to the Project from the environment are not considered a noise impact under CEQA. 1705
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
2 This page was intentionally left blank.
1706
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
3 1 INTRODUCTION
This noise analysis has been completed to determine the noise impacts associated with the development of the Esperanza Specific Plan Amendment (“Project”). This noise study briefly describes the Project, provides information regarding noise fundamentals, sets out the local regulatory setting, presents the study methods and procedures for noise analysis, and evaluates the future exterior noise environment. In addition, this study includes an analysis of the potential Project-related long-term stationary-source operational noise and short-term construction noise and vibration impacts.
1.1 SITE LOCATION
The Subarea 29 Specific Plan area is located on the northeast corner of Eucalyptus Avenue and Amherst Avenue in the City of Ontario. The location of the Project is shown in Exhibit 1-A. The Ontario International Airport (ONT) is located approximately 4 miles north of the Project site, and Chino Airport is located approximately 3 miles east of the Project site.
1.2 PROJECT DESCRIPTION
The Project is located within the Esperanza Specific Plan (ESP). The approved original Specific Plan contemplated a 736-student elementary school within Planning Area 11. As part of the Project, the land use designation will be updated from “School” to “MDR Medium Density Residential” consistent with the adjacent land use to the northeast, as shown in Exhibit 1-B.
It is our understanding that the Project consists of an amendment to the ESP to replace the elementary school with 161 multifamily residential dwelling units (with a density of approximately 16.1 dwelling units per net acre). The Project also includes a 6-foot-high wall along Eucalyptus Avenue. The Project site plan is illustrated in Exhibit 1-C. 1707
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
4 EXHIBIT 1-A: LOCATION MAP
1708
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
5 EXHIBIT 1-B: LAND USE PLAN
1709
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
6 EXHIBIT 1-C: PROJECT SITE PLAN
1710
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
7 2 FUNDAMENTALS
Noise is simply defined as “unwanted sound.” Sound becomes unwanted when it interferes with normal activities, when it causes actual physical harm, or when it has adverse effects on health. Noise is measured on a logarithmic scale of sound pressure level known as a decibel (dB). A-weighted decibels (dBA) approximate the subjective response of the human ear to broad-frequency noise sources by discriminating against very low and very high frequencies of the audible spectrum. They are adjusted to reflect only those frequencies which are audible to the human ear. Exhibit 2-A presents a summary of the typical noise levels and their subjective loudness and effects, which are described in more detail below.
EXHIBIT 2-A: TYPICAL NOISE LEVELS
Source: Environmental Protection Agency Office of Noise Abatement and Control, Information on Levels of Environmental Noise Requisite to Protect Public Health and Welfare with an Adequate Margin of Safety (EPA/ONAC 550/9-74-004) March 1974.
2.1 RANGE OF NOISE
Since the range of intensities that the human ear can detect is so large, the scale frequently used to measure intensity is a scale based on multiples of 10, the logarithmic scale. The scale for measuring intensity is the decibel scale. Each interval of 10 decibels indicates a sound energy ten times greater than before, which is perceived by the human ear as being roughly twice as loud. (2) The most common sounds vary between 40 dBA (very quiet) to 100 dBA (very loud). Normal conversation at three feet is roughly at 60 dBA, while loud jet engine noises equate to 110 dBA at approximately 1,000 feet, which can cause serious discomfort. (3) 1711
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
8 Another important aspect of noise is the duration of the sound and the way it is described and distributed in time.
2.2 NOISE DESCRIPTORS
Environmental noise descriptors are generally based on averages rather than instantaneous noise levels. The most used metric is the equivalent level (Leq). Equivalent sound levels are not measured directly but are calculated from sound pressure levels typically measured in Aweighted decibels (dBA). The equivalent sound level (Leq) represents a steady-state sound level containing the same total energy as a time-varying signal over a given sample period and is commonly used to describe the “average” noise levels within the environment.
Peak hour or average noise levels, while useful, do not completely describe a given noise environment. Noise levels lower than peak hour may be disturbing if they occur during times when quiet is most desirable, namely evening and nighttime (sleeping) hours. To account for this, the Community Noise Equivalent Level (CNEL), representing a composite 24-hour noise level is utilized. The CNEL is the weighted average of the intensity of a sound, with corrections for time of day, and averaged over 24 hours. The time-of-day corrections require the addition of 5 decibels to dBA Leq sound levels in the evening from 7:00 p.m. to 10:00 p.m., and the addition of 10 decibels to dBA Leq sound levels at night between 10:00 p.m. and 7:00 a.m. These additions are made to account for the noise-sensitive time periods during the evening and night hours when noise can become more intrusive. CNEL does not represent the actual sound level heard at any time but rather represents the total sound exposure. The City of Ontario relies on the 24-hour CNEL level to assess land use compatibility with transportation-related noise sources.
2.3 SOUND PROPAGATION
When sound propagates over a distance, it changes in level and frequency content. The way noise reduces with distance depends on the following factors.
2.3.1 GEOMETRIC SPREADING
Sound from a localized source (i.e., a stationary point source) propagates uniformly outward in a spherical pattern. The sound level attenuates (or decreases) at a rate of 6 dB for each doubling of distance from a point source. Highways consist of several localized noise sources on a defined path and hence can be treated as a line source, which approximates the effect of several point sources. Noise from a line source propagates outward in a cylindrical pattern, often referred to as cylindrical spreading. Sound levels attenuate at a rate of 3 dB for each doubling of distance from a line source. (2)
2.3.2 GROUND ABSORPTION
The propagation path of noise from a highway to a receiver is usually very close to the ground.
Noise attenuation from ground absorption and reflective wave canceling adds to the attenuation associated with geometric spreading. Traditionally, the excess attenuation has also been expressed in terms of attenuation per doubling of distance. This approximation is usually sufficiently accurate for distances of less than 200 ft. For acoustically hard sites (i.e., sites with a 1712
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
9 reflective surface between the source and the receiver, such as a parking lot or body of water), no excess ground attenuation is assumed. For acoustically absorptive or soft sites (i.e., those sites with an absorptive ground surface between the source and the receiver, such as soft dirt, grass, or scattered bushes and trees), an excess ground attenuation value of 1.5 dB per doubling of distance is normally assumed. When added to the cylindrical spreading, the excess ground attenuation results in an overall drop-off rate of 4.5 dB per doubling of distance from a line source. (4)
2.3.3 ATMOSPHERIC EFFECTS
Receivers located downwind from a source can be exposed to increased noise levels relative to calm conditions, whereas locations upwind can have lowered noise levels. Sound levels can be increased at large distances (e.g., more than 500 feet) due to atmospheric temperature inversion (i.e., increasing temperature with elevation). Other factors, such as air temperature, humidity, and turbulence, can also have significant effects. (2)
2.3.4 SHIELDING
A large object or barrier in the path between a noise source and a receiver can substantially attenuate noise levels at the receiver. The amount of attenuation provided by shielding depends on the size of the object and the frequency content of the noise source. Shielding by trees and other such vegetation typically only has an “out of sight, out of mind” effect. That is, the perception of noise impact tends to decrease when vegetation blocks the line of sight to nearby residents. However, for vegetation to provide a substantial, or even noticeable, noise reduction, the vegetation area must be at least 15 feet in height, 100 feet wide, and dense enough to completely obstruct the line of sight between the source and the receiver. This size of vegetation may provide up to 5 dBA of noise reduction. The Federal Highway Administration (FHWA) does not consider the planting of vegetation to be a noise abatement measure. (5)
2.4 NOISE CONTROL
Noise control is the process of obtaining an acceptable noise environment for an observation point or receiver by controlling the noise source, transmission path, receiver, or all three. This concept is known as the source-path-receiver concept. In general, noise control measures can be applied to these three elements.
2.5 NOISE BARRIER ATTENUATION
Effective noise barriers can reduce noise levels by 10 to 15 dBA, cutting the loudness of traffic noise in half. A noise barrier is most effective when placed close to the noise source or receiver.
Noise barriers, however, do have limitations. For a noise barrier to work, it must block the lineof-sight path of sound from the noise source.
2.6 LAND USE COMPATIBILITY WITH NOISE
Some land uses are more tolerant of noise than others. For example, schools, hospitals, churches, and residences are more sensitive to noise intrusion than are commercial or industrial developments and related activities. As ambient noise levels affect the perceived amenity or livability of a development, so too can the mismanagement of noise impacts impair 1713
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
10 the economic health and growth potential of a community by reducing the area’s desirability as a place to live, shop, and work. For this reason, land use compatibility with the noise environment is an important consideration in the planning and design process. The FHWA encourages State and Local government to regulate land development in such a way that noisesensitive land uses are either prohibited from being located adjacent to a highway, or that the developments are planned, designed, and constructed in such a way that noise impacts are minimized. (6)
2.7 COMMUNITY RESPONSE TO NOISE
Approximately sixteen percent of the population has a very low tolerance for noise and will object to any noise not of their making. Consequently, even in the quietest environment, some complaints may occur. Twenty to thirty percent of the population will not complain even in very severe noise environments. (7 pp. 8-6) Thus, a variety of reactions can be expected from people exposed to any given noise environment.
Surveys have shown that community response to noise varies from no reaction to vigorous action for newly introduced noises averaging from 10 dB below existing to 25 dB above existing. (8) According to research originally published in the Noise Effects Handbook (7), the percentage of high annoyance ranges from approximately 0 percent at 45 dB or less, 10 percent are highly annoyed at around 60 dB, and increases rapidly to approximately 70 percent being highly annoyed at approximately 85 dB or greater. Despite this variability in behavior on an individual level, the population can be expected to exhibit the following responses to changes in noise levels, as shown in Exhibit 2-B. A change of 3 dBA is considered barely perceptible, and changes of 5 dBA are considered readily perceptible. (4)
EXHIBIT 2-B: NOISE LEVEL INCREASE PERCEPTION
0 1 2 3 4 5 6 7 8 9 10
Just Perceptible
Barely Perceptible
Readily Perceptible
Twice as Loud
Noise Level Increase (dBA)
1714
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
11 2.8 VIBRATION
Per the Federal Transit Administration (FTA) Transit Noise Impact and Vibration Impact Assessment Manual (8) , vibration is the periodic oscillation of a medium or object. The rumbling sound caused by the vibration of room surfaces is called structure-borne noise.
Sources of ground-borne vibrations include natural phenomena (e.g., earthquakes, volcanic eruptions, sea waves, landslides) or human-made causes (e.g., explosions, machinery, traffic, trains, construction equipment). Vibration sources may be continuous, such as factory machinery, or transient, such as explosions. As is the case with airborne sound, ground-borne vibrations may be described by amplitude and frequency.
There are several different methods that are used to quantify vibration. The peak particle velocity (PPV) is defined as the maximum instantaneous peak of the vibration signal. The PPV is most frequently used to describe vibration impacts to buildings but is not always suitable for evaluating human response (annoyance) because it takes some time for the human body to respond to vibration signals. Instead, the human body responds to average vibration amplitude, often described as the root mean square (RMS). The RMS amplitude is defined as the average of the squared amplitude of the signal and is most frequently used to describe the effect of vibration on the human body. Decibel notation (VdB) is commonly used to measure RMS.
Decibel notation (VdB) serves to reduce the range of numbers used to describe human response to vibration. Typically, ground-borne vibration generated by man-made activities attenuates rapidly with distance from the source of the vibration. Sensitive receivers for vibration include structures (especially older masonry structures), people (especially residents, the elderly, and the sick), and vibration-sensitive equipment and/or activities.
The background vibration-velocity level in residential areas is generally 50 VdB. Ground-borne vibration is normally perceptible to humans at approximately 65 VdB. For most people, a vibration-velocity level of 75 VdB is the approximate dividing line between barely perceptible and distinctly perceptible levels. Typical outdoor sources of perceptible ground-borne vibration are construction equipment, steel-wheeled trains, and traffic on rough roads. If a roadway is smooth, the ground-borne vibration is rarely perceptible. The range of interest is from approximately 50 VdB, which is the typical background vibration-velocity level, to 100 VdB, which is the general threshold where minor damage can occur in fragile buildings. Exhibit 2-C illustrates common vibration sources and the human and structural response to ground-borne vibration.
1715
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
12 EXHIBIT 2-C: TYPICAL LEVELS OF GROUND-BORNE VIBRATION Source: Federal Transit Administration (FTA) Transit Noise and Vibration Impact Assessment Manual. 1716
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
13 3 REGULATORY SETTING
The federal government, the State of California, various county governments, and most municipalities in the state have established standards and ordinances to control noise. In most areas, automobile and truck traffic is the major source of environmental noise. Traffic activity generally produces an average sound level that remains constant with time. Air and rail traffic, and commercial and industrial activities are also major sources of noise in some areas. Federal, state, and local agencies regulate different aspects of environmental noise. Federal and state agencies generally set noise standards for mobile sources such as aircraft and motor vehicles, while regulation of stationary sources is left to local agencies.
3.1 STATE OF CALIFORNIA NOISE REQUIREMENTS
The State of California regulates freeway noise, sets standards for sound transmission, provides occupational noise control criteria, identifies noise standards, and provides guidance for local land use compatibility. State law requires that each county and city adopt a General Plan that includes a Noise Element, which is to be prepared per guidelines adopted by the Governor’s Office of Planning and Research (OPR). (9) The purpose of the Noise Element is to limit the exposure of the community to excessive noise levels. In addition, the California Environmental Quality Act (CEQA) requires that all known environmental effects of a project be analyzed, including environmental noise impacts.
3.2 CITY OF ONTARIO GENERAL PLAN
The City of Ontario General Plan (Policy Plan) identifies several policies to minimize the impacts of excessive noise levels throughout the community. Policy Plan Section S4, Noise Hazards, establishes a goal of maintaining an environment where noise does not adversely affect the public’s health, safety, and welfare. (10) To satisfy this goal, the Policy Plan identifies six policies related to: noise mitigation; coordination with transportation authorities; noise mitigation; truck traffic; roadway design; airport noise compatibility, and rail noise mitigation. Noise criteria identified in the General Plan Environmental Impact Report (EIR) in Table 5.13-3 are the guidelines used in the 2010 General Plan to evaluate land use compatibility within various noise environments. Table 5.13-3 is reproduced here in Exhibit 3-A Noise Level Exposure and Land Use Compatibility Guidelines. The Project residential land uses are considered clearly acceptable within exterior noise level environments approaching 60 dBA CNEL and normally acceptable within noise level environments up to 65 dBA CNEL. For noise level environments greater than 70 dBA CNEL, the Project land uses would be considered clearly unacceptable and no new construction should be permitted.
1717
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
14 EXHIBIT 3-A: NOISE LEVEL EXPOSURE AND LAND USE COMPATIBILITY GUIDELINES Source: The Ontario Plan 2050 Environmental Impact Report (Table 5.13-3). 1718
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
15 3.3 OPERATIONAL NOISE STANDARDS
To analyze noise impacts originating from a designated fixed location or private property such as the Project, stationary-source (operational) noise levels are evaluated against standards established under a City’s Municipal Code, which is included in Appendix 3.1. The City of Ontario requires that noise from new stationary sources in the City comply with the City’s Noise Ordinance, which limits the acceptable noise at the property line of the impacted property to reduce nuisances to sensitive land uses. Compliance with the City’s Noise Ordinance would result in noise levels that are acceptable to the City and would result in less than significant noise impacts from stationary sources (11).
Section 5-29.04(a) identifies the allowable daytime and nighttime ambient exterior noise standards for each land use type. For residential land uses (Noise Zone I), ambient exterior noise levels may not exceed 65 dBA Leq during the daytime hours (7:00 a.m. to 10:00 p.m.) and may not exceed 45 dBA Leq during the nighttime hours (10:00 p.m. to 7:00 a.m.). (12) The lower noise level standard shall apply on the boundary between two (2) different noise zones. If the ambient noise level exceeds the resulting standard, the ambient noise level shall be the standard. The maximum acceptable Project-related operational noise levels received at off-site land uses in the City of Ontario are identified in Table 3-1.
TABLE 3-1: OPERATIONAL NOISE STANDARDS
Noise Zone Land Use
Exterior Noise Levels (dBA Leq)2
Daytime
(7 am-10 pm)
Nighttime
(10 pm-7 am)
I Single-Family Residential 65 45
II Multi-Family Residential 65 50
III Commercial 65 60
IV Residential Mixed-Use 70 70
V Manufacturing and Industrial 70 70 1
Source: Section 5-29.04 of the City of Ontario Municipal Code (Appendix 3.1). 2 Leq represents a steady-state sound level containing the same total energy as a time-varying signal over a given period.
3.4 CONSTRUCTION NOISE STANDARDS
The City of Ontario has set restrictions to control noise impacts associated with construction.
Section 5-29.09 of the Municipal Code states: No person, while engaged in construction, remodeling, digging, grading, demolition or any other related building activity, shall operate any tool, equipment or machine in a manner that produces loud noise that disturbs a person of normal sensitivity who works or resides in the vicinity, or a Police or Code Enforcement Officer, on any weekday except between the hours of 7:00 a.m. and 6:00 p.m. or on Saturday or Sunday between the hours of 9:00 a.m. and 6:00 p.m. (12) While the City establishes limits to the hours during which construction activity may take place, it does not identify specific noise level limits for construction noise levels at potentially affected receiver locations for CEQA analysis purposes. Therefore, a numerical construction threshold based on the Federal Transit 1719
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
16 Administration (FTA) Transit Noise and Vibration Impact Assessment Manual is used for the analysis of daytime construction impacts, as discussed below.
According to the FTA, local noise ordinances are typically not very useful in evaluating construction noise. They usually relate to nuisance and hours of allowed activity and sometimes specify limits in terms of maximum levels but are generally not practical for assessing the impact of a construction project. Project construction noise criteria should account for the existing noise environment, the absolute noise levels during construction activities, the duration of the construction, and the adjacent land use. Due to the lack of standardized construction noise thresholds, the FTA provides guidelines that can be considered reasonable criteria for construction noise assessment. The FTA considers a daytime exterior construction noise level of 80 dBA Leq as a reasonable threshold for noise-sensitive residential land use. (8 p. 179)
3.5 VIBRATION STANDARDS
Construction activity can result in varying degrees of ground-borne vibration, depending on the equipment and methods used, distance to the affected structures, and soil type. Construction vibration is generally associated with pile driving and rock blasting. Other construction equipment, such as air compressors, light trucks, hydraulic loaders, etc., generates little or no ground vibration. (8) To analyze vibration impacts originating from the operation and construction of a project, vibration-generating activities are appropriately evaluated against standards established under a City’s Municipal Code, if such standards exist. However, the City of Ontario does not identify specific vibration level limits. Therefore, for analysis purposes, the Caltrans Transportation and Construction Vibration Guidance Manual, (13 p. 38) Table 19, vibration damage limit, is used in this noise study to assess potential temporary constructionrelated impacts at adjacent building locations. The nearest noise-sensitive buildings adjacent to the Project site can best be described as “older residential structures” with a maximum acceptable continuous vibration threshold of 0.3 PPV (in/sec).
3.6 AIRPORT LAND USE COMPATIBILITY
The Project site is located approximately 4 miles south of the Ontario International Airport (ONT). This places the Project site within the ONT Airport Influence Area according to Policy Map 2-1 of the Ontario International Airport Land Use Compatibility Plan (ONT ALUCP). The ONT ALUCP was amended in July 2018 to promote compatibility between the airport and the land uses that surround it (14). Since the Project site is located within the ONT Airport Influence Area, the Project is subject to the Noise Criteria established in Table 2-3 in the ONT ALUCP. As shown in Exhibit 3-B, the Project site is located within the ONT Airport Influence Area but outside the 60 dBA CNEL airport noise impact zone consistent with Policy Map 2-3. According to Table 2-3 of the ONT ALUCP, residential land uses and schools located outside the 60 dBA CNEL noise level contours of ONT, such as the Project, are considered normally compatible land use.
For normally compatible land use, either the activities associated with the land use are inherently noisy or standard construction methods will sufficiently attenuate exterior noise to an acceptable indoor community noise equivalent level (CNEL). 1720
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
17 EXHIBIT 3-B: ONT AIRPORT NOISE LEVEL CONTOURS
1721
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
18 The Project site is located approximately 2.5 miles east of the Chino Airport (CNO). This places the Project site outside the Chino Airport Influence Area according to Figure 1-4 Airport Referral Areas of the Comprehensive Land Use Plan for the Chino Airport. As shown in Exhibit 3-C, the Project site is outside the 60 dBA CNEL airport noise level contour, and impacts would be less than significant.
EXHIBIT 3-C: CHINO AIRPORT NOISE LEVEL CONTOURS
1722
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
19 4 SIGNIFICANCE CRITERIA
The following significance criteria are based on currently adopted guidance provided by Appendix G of the California Environmental Quality Act (CEQA) Guidelines. (15) For the purposes of this report, impacts would be potentially significant if the Project results in or causes:
A. Generation of a substantial temporary or permanent increase in ambient noise levels in the vicinity of the project in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies?
B. Generation of excessive ground-borne vibration or ground-borne noise levels? C. For a project located within the vicinity of a private airstrip or an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project expose people residing or working in the project area to excessive noise levels?
4.1 NOISE LEVEL INCREASES (THRESHOLD A)
Noise level increases resulting from the Project are evaluated based on the Appendix G CEQA Guidelines. Under CEQA, consideration must be given to the magnitude of the increase, the existing baseline ambient noise levels, and the location of receivers to determine if a noise increase represents a significant adverse environmental impact. This approach recognizes that there is no single noise increase that renders the noise impact significant. (16) This is primarily because of the wide variation in individual thresholds of annoyance and differing individual experiences with noise. Thus, an important way of determining a person’s subjective reaction to a new noise is to compare it to the existing environment to which one has adapted—the socalled ambient environment. In general, the more a new noise exceeds the previously existing ambient noise level, the less acceptable the new noise will typically be judged.
The Federal Interagency Committee on Noise (FICON) (17) developed guidance to be used for the assessment of project-generated increases in noise levels that consider the ambient noise level. The FICON recommendations are based on studies that relate aircraft noise levels to the percentage of persons highly annoyed by aircraft noise. Although the FICON recommendations were specifically developed to assess aircraft noise impacts, these recommendations are often used in environmental noise impact assessments involving the use of cumulative noise exposure metrics, such as the average-daily noise level (CNEL) and equivalent continuous noise level (Leq).
As previously stated, the approach used in this noise study recognizes that there is no single noise increase that renders the noise impact significant, based on a 2008 California Court of Appeal ruling on Gray v. County of Madera. (16) For example, if the ambient noise environment is quiet (<60 dBA) and the new noise source greatly increases the noise levels, an impact may occur if the noise criteria are exceeded. Therefore, for this analysis, a readily perceptible 5 dBA or greater project-related noise level increase is considered a significant impact when the without project noise levels are below 60 dBA. Per the FICON, in areas where the without project noise levels range from 60 to 64 dBA, a 3 dBA barely perceptible noise level increase 1723
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
20 appears to be appropriate for most people. When the without project noise levels are 65 dBA and higher, any increase in community noise louder than 1.5 dBA or greater is considered a significant impact if the noise criteria for a given land use is exceeded since it likely contributes to an existing noise exposure exceedance. The FICON guidance provides an established source of criteria to assess the impacts of substantial temporary or permanent increases in baseline ambient noise levels. Based on the FICON criteria, the amount to which a given noise level increase is considered acceptable is reduced when the without Project (baseline) noise levels are already shown to exceed certain land-use specific exterior noise level criteria. The specific levels are based on typical responses to noise level increases of 5 dBA or readily perceptible, 3 dBA or barely perceptible, and 1.5 dBA depending on the underlying without Project noise levels for noise-sensitive uses. These levels of increase and their perceived acceptance are consistent with guidance provided by the Federal Aviation Administration, the Federal Highway Administration (4 p. 9), and Caltrans (18 p. 2_48).
4.2 VIBRATION (THRESHOLD B)
As described in Section 3.5, the vibration impacts originating from the construction of the Esperanza Specific Plan Amendment, vibration-generating activities are appropriately evaluated using the Caltrans vibration damage thresholds to assess potential temporary constructionrelated impacts at adjacent building locations. The nearest noise-sensitive buildings adjacent to the Project site can best be described as “older residential structures” with a maximum acceptable continuous vibration threshold of 0.3 PPV (in/sec).
4.3 CEQAGUIDELINES NOT FURTHER ANALYZED (THRESHOLD C)
CEQA Noise Threshold C applies when there are nearby public and private airports and/or airstrips and focuses on land use compatibility of the Project to nearby airports and airstrips.
The closest airport that would require additional noise analysis under CEQA Guideline threshold C is the Ontario International Airport, which is located approximately 4 miles north of the Project site. As previously indicated in Section 3.6, the Project site is located within the ONT Airport Influence Area but is located outside the 60 dBA CNEL airport noise impact zone.
Similarly, as indicated in Section 3.6, the Project site is not located within the CNO Airport Influence Area and is outside the 60 dBA CNEL airport noise impact zone. Therefore, airport noise impacts are considered less than significant, and no further noise analysis is provided under Guideline C.
1724
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
21 4.4 SIGNIFICANCE CRITERIA SUMMARY
Noise impacts shall be considered significant if any of the following occur as a direct result of the Project. Table 4-1 shows the significance criteria summary matrix that includes the allowable criteria used to identify potentially significant incremental noise level increases.
TABLE 4-1: SIGNIFICANCE CRITERIA SUMMARY
Analysis Receiving
Land Use Condition(s) Significance Criteria
Daytime Nighttime
Off-Site
Traffic All
If ambient is < 60 dBA CNEL2 ≥ 5 dBA CNEL Project increase If ambient is 60 - 64 dBA CNEL2 ≥ 3 dBA CNEL Project increase If ambient is >= 65 dBA CNEL2 ≥ 1.5 dBA CNEL Project increase On-Site Traffic All See Exhibit 3-A
Operational
NoiseSensitive
Exterior Noise Level Standards1
65 dBA Leq 45 dBA Leq
If ambient is < 60 dBA Leq2 ≥ 5 dBA Leq Project increase If ambient is 60 - 65 dBA Leq2 ≥ 3 dBA Leq Project increase If ambient is > 65 dBA Leq2 ≥ 1.5 dBA Leq Project increase Construction
Permitted hours of 7:00 a.m. and 6:00 p.m. on weekdays3 Noise Level Threshold4 80 dBA Leq
Vibration Level Threshold5 0.3 PPV (in/sec) 1 City of Ontario Municipal Code, 5-29.04(a) exterior noise standards for residential land uses (Noise Zone I). 2 FICON, 1992. 3 City of Ontario Municipal Code Section 5-29.09(a). 4 Federal Transit Administration, Transit Noise and Vibration Impact Assessment Manual. 5 Caltrans Transportation and Construction Vibration Manual, April 2020 Table 19. "Daytime" = 7:00 a.m. to 10:00 p.m.; "Nighttime" = 10:00 p.m. to 7:00 a.m.
1725
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
22 This page was intentionally left blank.
1726
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
23 5 EXISTING NOISE LEVEL MEASUREMENTS
To assess the existing noise level environment, six 24-hour noise level measurements were taken at sensitive receiver locations in the Project study area. The receiver locations were selected to describe and document the existing noise environment within the Project study area. Exhibit 5-A provides the boundaries of the Project study area and the noise level measurement locations. To fully describe the existing noise conditions, noise level measurements were collected by Urban Crossroads, Inc. on Wednesday, October 4, 2023.
Appendix 5.1 includes study area photos.
5.1 MEASUREMENT PROCEDURE AND CRITERIA
To describe the existing noise environment, the hourly noise levels were measured during typical weekday conditions over a 24-hour period. By collecting individual hourly noise level measurements, it is possible to describe the daytime and nighttime hourly noise levels and calculate the 24-hour CNEL. The long-term noise readings were recorded using Piccolo Type 2 integrating sound level meter and dataloggers. The Piccolo sound level meters were calibrated using a Larson-Davis calibrator, Model CAL 150. All noise meters were programmed in "slow" mode to record noise levels in "A" weighted form. The sound level meters and microphones were equipped with a windscreen during all measurements. All noise level measurement equipment satisfies the American National Standards Institute (ANSI) standard specifications for sound level meters ANSI S1.4-2014/IEC 61672-1:2013.
5.2 NOISE MEASUREMENT LOCATIONS
The long-term noise level measurements were positioned as close to the nearest sensitive receiver locations as possible to assess the existing ambient hourly noise levels surrounding the Project site. Actual measurement locations may be affected by location access, equipment security, and proximity to noise sources or solid objects that would affect the measurement and thus may be located at locations that have similar acoustic conditions as the desired locations. Both Caltrans and the FTA recognize that it is not reasonable to collect noise level measurements that can fully represent any part of a private yard, patio, deck, or balcony normally used for human activity when estimating impacts for new development projects. This is demonstrated in the Caltrans general site location guidelines, which indicate that sites must be free of noise contamination by sources other than sources of interest. Avoid sites located near sources such as barking dogs, lawnmowers, pool pumps, and air conditioners unless it is the express intent of the analyst to measure these sources. (2) Further, FTA guidance states, that it is not necessary nor recommended that existing noise exposure be determined by measuring at every noise-sensitive location in the project area. Rather, the recommended approach is to characterize the noise environment for clusters of sites based on measurements or estimates at representative locations in the community. (19)
1727
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
24 EXHIBIT 5-A: AMBIENT NOISE MEASUREMENT LOCATIONS
1728
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
25 Based on recommendations of Caltrans and the FTA, it is not necessary to collect measurements at each individual building or residence because each measurement represents a group of locations that share acoustical equivalence. (19) In other words, the area represented by the measurement location shares similar shielding, terrain, and geometric relationship to the reference noise source as the receiver location. Receivers represent a location of noise-sensitive areas and are used to estimate the future noise level impacts.
Collecting reference ambient noise level measurements at the nearby sensitive receiver locations allows for a comparison of the before and after Project noise levels and is necessary to assess potential noise impacts due to the Project’s contribution to the ambient noise levels.
5.3 NOISE MEASUREMENT RESULTS
The noise measurements presented below focus on the average or equivalent sound levels (Leq). The equivalent sound level (Leq) represents a steady-state sound level containing the same total energy as a time-varying signal over a given sample period. Table 5-1 identifies the hourly daytime (7:00 a.m. to 10:00 p.m.) and nighttime (10:00 p.m. to 7:00 a.m.) noise levels at each noise level measurement location. Appendix 5.2 provides a summary of the existing hourly ambient noise levels.
TABLE 5-1: NOISE LEVEL MEASUREMENT SUMMARY
Location1 Description
Energy Average
Noise Level
(dBA Leq)
2 Daytime Nighttime
L1 Located East of the site at future residential 67.9 55.3 L2 Located Northwest of the site at future
residential 45.1 36.9
L3 Located North of the site 47.4 34.9
L4 Located West of the site near the residence
at 4500 S. Amherst Ave. 53.2 53.3
L5 Located South of the site near the residence
at 4576 S Afton Privado 60.3 53.4
L6 Located South of the site near the residence
at 4554 S Afton Privado 66.0 45.2
1 See Exhibit 5-A for the noise level measurement locations. 2 Energy (logarithmic) average levels. The long-term 24-hour measurement worksheets are included in Appendix 5.2.
"Daytime" = 7:00 a.m. to 10:00 p.m.; "Nighttime" = 10:00 p.m. to 7:00 a.m.
Table 5-1 provides the (energy average) noise levels used to describe the daytime and nighttime ambient conditions. These daytime and nighttime energy average noise levels represent the average of all hourly noise levels observed during these time periods expressed as a single number. Appendix 5.2 provides summary worksheets of the noise levels for each 1729
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
26 hour as well as the minimum, maximum, L1, L2, L5, L8, L25, L50, L90, L95, and L99 percentile noise levels observed during the daytime and nighttime periods.
1730
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
27 6 METHODS AND PROCEDURES
The following section outlines the methods and procedures used to model and analyze the future traffic noise environment.
6.1 FHWA TRAFFIC NOISE PREDICTION MODEL
The estimated roadway noise impacts from vehicular traffic were calculated using a computer program that replicates the Federal Highway Administration (FHWA) Traffic Noise Prediction Model- FHWA-RD-77-108. (20) The FHWA Model arrives at a predicted noise level through a series of adjustments to the Reference Energy Mean Emission Level (REMEL). In California, the national REMELs are substituted with the California Vehicle Noise (Calveno) Emission Levels. (21) Adjustments are then made to the REMEL to account for: the roadway classification (e.g., collector, secondary, major, or arterial), the roadway active width (i.e., the distance between the center of the outermost travel lanes on each side of the roadway), the total average daily traffic (ADT), the travel speed, the percentages of automobiles, medium trucks, and heavy trucks in the traffic volume, the roadway grade, the angle of view (e.g., whether the roadway view is blocked), the site conditions ("hard" or "soft" relates to the absorption of the ground, pavement, or landscaping), and the percentage of total ADT which flows each hour throughout a 24-hour period.
6.2 ON-SITE TRAFFIC NOISE PREDICTION MODEL INPUTS
Table 6-1 presents the on-site roadway parameters, including the ADT volumes used for this study. The on-site roadway parameters are based on the City of Ontario General Plan Mobility Element roadway classifications. The maximum two-way traffic volumes are based on the roadway design capacity and reflect future long-range traffic conditions needed to assess the on-site traffic noise environment and to identify potential noise abatement measures (if any) that address the worst-case future noise conditions.
TABLE 6-1: ON-SITE ROADWAY PARAMETERS
Location Classification1 Lanes
Average Daily
Traffic
Volume2
Speed
Limit
(mph)2
Site
Conditions2
Eucalyptus Ave Arterial 4 21,700 40 Soft
Amherst Ave Local 2 9,500 25 Soft
Clifton Ave Local 2 9,500 25 Soft
Chatham St Local 2 9,500 25 Soft 1
Road classifications based upon the Esperanza Specific Plan, Exhibit 10 Master Circulation Plan. 2 Volumes based upon the roadway capacity defined City of Ontario General Plan (TOP2050) Draft EIR, Appendix K.
6.3 TRAFFIC NOISE PREDICTION MODEL INPUTS
The average daily traffic (ADT) volumes used for this study are presented in Table 6-1. The Existing Plus Project ADT was derived based on the differences in Opening Year ADT volumes 1731
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
28 added to the Existing ADT volumes. Tables 6-2 and 6-3 provide the time of day (daytime, evening, and nighttime) vehicle splits used for calculating CNEL values.
TABLE 6-2: TIME OF DAY VEHICLE SPLITS
Time Period
Vehicle Type
Autos Medium
Trucks Heavy Trucks
Daytime (7:00 a.m. - 7:00 p.m.) 77.50% 84.80% 86.50%
Evening (7:00 p.m. - 10:00 p.m.) 12.90% 4.90% 2.70%
Nighttime (10:00 p.m. - 7:00 a.m.) 9.60% 10.30% 10.80%
Total: 100.00% 100.00% 100.00%
Source: Typical Southern California vehicle mix.
TABLE 6-3: DISTRIBUTION OF TRAFFIC FLOW BY VEHICLE TYPE (VEHICLE MIX) Roadway
Total % Traffic Flow
Total
Autos Medium Trucks Heavy Trucks
All Roadways 97.42% 1.84% 0.74% 100.00%
Source: Typical Southern California vehicle mix.
1732
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
29 7 OFF-SITE TRAFFIC NOISE ANALYSIS
The Project would result in a small increase in regional and local traffic volumes. Because sources are calculated on a logarithmic scale, a doubling of the energy is required to generate a noise level increase of 3 dBA. In the case of traffic, a doubling of the traffic volume, without changing the vehicle speeds or mix ratio, results in a noise increase of 3 dBA.
Based on the Project trip generation analysis, the Project is anticipated to generate a net -5 new trips daily (22). Therefore, the Project’s traffic volumes would not result in an increase on Eucalyptus Avenue or other area roadways greater than predicted in the original Esperanza Specific Plan or The Ontario Plan 2050 (TOP 2050). Off-site traffic noise impacts would continue to be less than significant under CEQA.
1733
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
30 This page was intentionally left blank.
1734
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
31 8 ON-SITE TRAFFIC NOISE ANALYSIS
An on-site exterior noise impact analysis has been completed to determine the noise exposure levels resulting from adjacent transportation noise sources in the Project study area and identify potential noise attenuation measures that would achieve acceptable Project exterior and interior noise levels. The primary source of transportation noise affecting the Project site is anticipated to be from Eucalyptus Avenue, Clifton Avenue, Chatham Street, and Amherst Avenue. The Project would also be exposed to nominal traffic noise from the Project’s internal roads. However, due to the low traffic volume/speed, traffic noise from these internal roads will not substantially contribute to ambient noise conditions.
8.1 EXTERIOR NOISE ANALYSIS
The expected exterior noise levels for the on-site Project land uses were estimated using the FHWA traffic noise prediction model and the parameters outlined in Tables 6-1 to 6-3. Table 8-1 presents a summary of future on-site exterior traffic noise levels at Project building facades, including the Project 6-foot-high wall along Eucalyptus Avenue. The on-site traffic noise analysis calculations are provided in Appendix 8.1.
TABLE 8-1: EXTERIOR NOISE LEVELS
Building Roadway
Unmitigated
Exterior
Noise Level
(dBA CNEL)2
Land Use
Compatibility3
BLDG 20 Eucalyptus Ave 59.3 Clearly Acceptable
BLDG 7-14 Eucalyptus Ave 59.4 Clearly Acceptable
BLDG 6 Eucalyptus Ave 59.4 Clearly Acceptable
BLDG 5-6 Clifton Ave 62.7 Normally Acceptable
BLDG 4 Clifton Ave 61.0 Normally Acceptable
BLDG 4 Chatham St 64.4 Normally Acceptable
BLDG 1-3 Chatham St 63.9 Normally Acceptable
BLDG 27-28 Chatham St 62.3 Normally Acceptable
BLDG 27 Amherst Ave 62.9 Normally Acceptable
BLDG 26-22 Amherst Ave 62.9 Normally Acceptable
BLDG 20-21 Amherst Ave 62.9 Normally Acceptable 1 Project buildings shown on Exhibit 1-B. 2 Exterior on-site traffic noise level calculations are included in Appendix 8.1. 3 Based on the General Plan land use compatibility guidelines as shown in Exhibit 3-A.
The on-site exterior traffic noise analysis indicates that all buildings will experience exterior noise levels ranging from 59.3 to 64.4 CNEL. Based on the City of Ontario Land Use Compatibility for Community Noise Exposure shown in Exhibit 3-A, the Project land uses are considered clearly acceptable to normally acceptable with unmitigated exterior noise levels of less than 65 dBA CNEL. For normally acceptable exterior noise levels, acoustical reports will be 1735
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
32 required for major new residential construction. Conventional construction with closed windows and fresh air supply systems of air conditioning will normally suffice.
In addition, the Project will satisfy the City of Ontario 65 dBA CNEL exterior noise level standards for residential land uses. This noise analysis shows that the Project will satisfy the City of Ontario 65 dBA CNEL exterior noise level standards for residential use without additional noise abatement measures.
8.1.4 EXTERIOR TRAFFIC NOISE LEVEL COMPLIANCE
Table 8-1 shows that on-site traffic noise levels do not exceed the City of Ontario 65 dBA CNEL exterior noise level standards for noise-sensitive residential land uses.
8.2 INTERIOR NOISE ANALYSIS
To ensure that the interior noise levels comply with the interior noise level standards, future exterior noise levels were calculated at the first-, second-, and third-floor building façade/balcony locations.
8.2.1 NOISE REDUCTION METHODOLOGY
The interior noise level is the difference between the predicted exterior noise level at the building facade and the noise reduction of the structure. Typical building construction will provide a Noise Reduction (NR) of approximately 12 dBA with "windows open" and a minimum 25 dBA noise reduction with "windows closed." (4) (23)
8.2.2 INTERIOR NOISE LEVEL ASSESSMENT
To provide the necessary interior noise level reduction, Tables 8-2 through 8-4 indicate that Project land uses adjacent to Eucalyptus Avenue, Clifton Avenue, Chatham Street, and Amherst Avenue will require a windows-closed condition and mechanical ventilation (e.g., air conditioning). Table 8-2 shows that the future noise levels at the first-floor building façade are expected to range from 59.3 to 64.4 dBA CNEL, and with standard construction, interior noise levels will range from 33.9 to 39.4 dBA CNEL. Table 8-3 shows that the future noise levels at the second-floor building façade are expected to range from 60.8 to 65.5 dBA CNEL, and with standard construction, interior noise levels will range from 38.5 to 40.5 dBA CNEL. Table 8-4 shows that the future noise levels at the third-floor building façade are expected to range from
60.4 to 65.3 dBA CNEL, and with standard construction, interior noise levels will range from
35.4 to 40.3 dBA CNEL.
8.2.3 INTERIOR TRAFFIC NOISE LEVEL COMPLIANCE
Tables 8-2 through 8-4 show that on-site interior traffic noise levels will not exceed the City of Ontario 45 dBA CNEL interior noise level standard for residential development and additional noise abatement measures are unnecessary.
1736
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
33 TABLE 8-2: FIRST-FLOOR INTERIOR NOISE LEVELS (CNEL)
Building Roadway
Noise
Level
at Façade2
Required
Interior
Noise
Reduction3
Estimated
Interior
Noise
Reduction4
Upgraded
Windows5
Interior
Noise
Level6
Threshold7 Threshold Exceeded?
BLDG 20 Keller Rd. 59.3 14.3 25.0 No 34.3 45 No
BLDG 7-14 Keller Rd. 59.4 14.4 25.0 No 34.4 45 No
BLDG 6 Keller Rd. 59.4 14.4 25.0 No 34.4 45 No
BLDG 5-6 Keller Rd. 62.7 17.7 25.0 No 37.7 45 No
BLDG 4 Keller Rd. 61.0 16.0 25.0 No 36.0 45 No BLDG 4 Keller Rd. 64.4 19.4 25.0 No 39.4 45 No BLDG 1-3 Keller Rd. 63.9 18.9 25.0 No 38.9 45 No
BLDG 27-28 Keller Rd. 62.3 17.3 25.0 No 37.3 45 No
BLDG 27 Keller Rd. 62.9 17.9 25.0 No 37.9 45 No
BLDG 26-22 Keller Rd. 62.9 17.9 25.0 No 37.9 45 No BLDG 20-21 Keller Rd. 62.9 17.9 25.0 No 37.9 45 No 1 Project site plan shown on Exhibit 1-B. 2 Exterior noise level at the facade with a windows-closed condition and a means of mechanical ventilation (e.g., air conditioning). See Appendix 8.1. 3 Noise reduction to satisfy the interior noise level threshold. 4 A minimum of 25 dBA noise reduction is assumed with standard building construction and approximately 2 dBA less than the STC rating for upgraded windows. 5 Does the required interior noise reduction trigger upgraded windows with a minimum STC rating of greater than 27? 6 Estimated interior noise level with minimum STC rating for all windows. 7 Interior noise level threshold: 45 dBA CNEL for residential use (California Code of Regulations, Title 24, Building Standards Administrative Code). 1737
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
34 TABLE 8-3: SECOND-FLOOR INTERIOR NOISE LEVELS (CNEL) Building Roadway
Noise
Level
at Façade2
Required
Interior
Noise
Reduction3
Estimated
Interior
Noise
Reduction4
Upgraded
Windows5
Interior
Noise
Level6
Threshold7 Threshold Exceeded?
BLDG 20 Keller Rd. 65.3 20.3 25.0 No 40.3 45 No
BLDG 7-14 Keller Rd. 65.5 20.5 25.0 No 40.5 45 No
BLDG 6 Keller Rd. 65.4 20.4 25.0 No 40.4 45 No
BLDG 5-6 Keller Rd. 62.4 17.4 25.0 No 37.4 45 No
BLDG 4 Keller Rd. 60.8 15.8 25.0 No 35.8 45 No BLDG 4 Keller Rd. 63.9 18.9 25.0 No 38.9 45 No BLDG 1-3 Keller Rd. 63.5 18.5 25.0 No 38.5 45 No
BLDG 27-28 Keller Rd. 62.0 17.0 25.0 No 37.0 45 No
BLDG 27 Keller Rd. 62.5 17.5 25.0 No 37.5 45 No
BLDG 26-22 Keller Rd. 62.5 17.5 25.0 No 37.5 45 No BLDG 20-21 Keller Rd. 62.5 17.5 25.0 No 37.5 45 No 1 Project site plan shown on Exhibit 1-B. 2 Exterior noise level at the facade with a windows-closed condition and a means of mechanical ventilation (e.g., air conditioning). See Appendix 8.1. 3 Noise reduction to satisfy the interior noise level threshold. 4 A minimum of 25 dBA noise reduction is assumed with standard building construction and approximately 2 dBA less than the STC rating for upgraded windows. 5 Does the required interior noise reduction trigger upgraded windows with a minimum STC rating of greater than 27? 6 Estimated interior noise level with minimum STC rating for all windows. 7 Interior noise level threshold: 45 dBA CNEL for residential use (California Code of Regulations, Title 24, Building Standards Administrative Code). 1738
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
35 TABLE 8-4: THIRD-FLOOR INTERIOR NOISE LEVELS (CNEL)
Building Roadway
Noise
Level
at Façade2
Required
Interior
Noise
Reduction3
Estimated
Interior
Noise
Reduction4
Upgraded
Windows5
Interior
Noise
Level6
Threshold7 Threshold Exceeded?
BLDG 20 Keller Rd. NA NA 25.0 NA NA 45 NA
BLDG 7-14 Keller Rd. 65.3 20.3 25.0 No 40.3 45 No
BLDG 6 Keller Rd. 65.3 20.3 25.0 No 40.3 45 No
BLDG 5-6 Keller Rd. 61.7 16.7 25.0 No 36.7 45 No
BLDG 4 Keller Rd. 60.4 15.4 25.0 No 35.4 45 No BLDG 4 Keller Rd. 62.9 17.9 25.0 No 37.9 45 No BLDG 1-3 Keller Rd. 62.6 17.6 25.0 No 37.6 45 No
BLDG 27-28 Keller Rd. NA NA 25.0 NA NA 45 NA
BLDG 27 Keller Rd. NA NA 25.0 NA NA 45 NA
BLDG 26-22 Keller Rd. NA NA 25.0 NA NA 45 NA BLDG 20-21 Keller Rd. NA NA 25.0 NA NA 45 NA 1 Project site plan shown on Exhibit 1-B. 2 Exterior noise level at the facade with a windows-closed condition and a means of mechanical ventilation (e.g., air conditioning). See Appendix 8.1. 3 Noise reduction to satisfy the interior noise level threshold. 4 A minimum of 25 dBA noise reduction is assumed with standard building construction and approximately 2 dBA less than the STC rating for upgraded windows. 5 Does the required interior noise reduction trigger upgraded windows with a minimum STC rating of greater than 27? 6 Estimated interior noise level with minimum STC rating for all windows. 7 Interior noise level threshold: 45 dBA CNEL for residential use (California Code of Regulations, Title 24, Building Standards Administrative Code). 1739
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
36 This page was intentionally left blank.
1740
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
37 9 RECEIVER LOCATIONS
To assess the potential for long-term operational and short-term construction noise impacts, the following sensitive receiver locations, as shown in Exhibit 9-A, were identified as representative locations for analysis. Sensitive receivers are generally defined as locations where people reside or where the presence of unwanted sound could otherwise adversely affect the use of the land. Noise-sensitive land uses are generally considered to include schools, hospitals, single-family dwellings, mobile home parks, churches, libraries, and recreation areas.
Moderately noise-sensitive land uses typically include multi-family dwellings, hotels, motels, dormitories, outpatient clinics, cemeteries, golf courses, country clubs, athletic/tennis clubs, and equestrian clubs. Land uses considered relatively insensitive to noise include business, commercial, and professional developments. Land uses typically unaffected by noise include industrial, manufacturing, utilities, agriculture, undeveloped land, parking lots, warehousing, liquid and solid waste facilities, salvage yards, and transit terminals.
To describe the potential off-site Project noise levels, six receiver locations in the vicinity of the Project site were identified. The selection of receiver locations is based on FHWA guidelines and is consistent with additional guidance provided by Caltrans and the FTA. Other sensitive land uses in the Project study area located at greater distances than those identified in this noise study will experience lower noise levels than those presented in this report due to the additional attenuation from distance and the shielding of intervening structures. Distance is measured in a straight line from the project boundary to each receiver location.
R1: Location R1 represents the future residential area east of Clifton Avenue, approximately 83 feet east of the Project site. Receptor R1 is placed at the nearest potential location for future housing facing the Project site.
R2: Location R2 represents the future residential area northeast of the intersection of Clifton Avenue and Chatham Street, approximately 92 feet northeast of the Project site. Receptor R2 is placed at the nearest potential location for future housing facing the Project site.
R3: Location R3 represents the future park north of Chatham Street, approximately 75 feet north of the Project site. Receptor R3 is placed at the nearest potential location within the park use facing the Project site.
R4: Location R4 represents an existing residence at 4508 S. Amherst Avenue, approximately 130 feet west of the Project site. Receptor R4 is placed at the private outdoor living areas (backyards) facing the Project site.
R5: Location R5 represents the existing residence at 4095 E. Amigos Privado, approximately 202 feet south of the Project site. Receptor R5 is placed at the private outdoor living areas (backyards) facing the Project site.
R6: Location R6 represents the existing residence at 4556 S. Afton Privado, approximately 142 feet southeast of the Project site. Receptor R6 is placed at the private outdoor living areas (backyards) facing the Project site.
1741
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
38 EXHIBIT 9-A: RECEIVER LOCATIONS
1742
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
39 10 OPERATIONAL NOISE ANALYSIS
The Project is considered a noise-sensitive receiving land use and is not expected to include any specific type of operational noise levels beyond those typically associated with residential land uses in the Project study area. Additionally, Section 21085 of the California Public Resources Code states in part, “…for residential projects, the effects of noise generated by project occupants and their guests on human beings is not a significant effect on the environment.” (29) A review of the legislative record indicates the author’s intent for Section 21085 was to “remove the potential for litigants to challenge residential development based on the speculation that the new residents will create unwanted noises. It would also reestablish existing precedent that minor and intermittent noise nuisances, such as from unamplified human voices, be addressed through local nuisance ordinances and not via CEQA.
Consequently, activities solely associated with occupants and quests, such as the swimming pool/spa activities, dog park activities, and outdoor activities in common spaces, are not considered part of this operational noise analysis for CEQA.” Based on the intent of the author of Section 21085, the operational noise sources are limited to the mechanical and non-verbal noise sources that occur onsite, including air conditioning units, trash enclosure activity, and parking lot movements.
Therefore, this section analyzes the potential operational noise impacts at the nearby receiver locations, identified in Section 9, resulting from the operation of air conditioning units, trash enclosure activity, and parking lot movements. Exhibit 10-A identifies the noise source locations used to assess the equivalent Leq operational noise levels.
10.1 OPERATIONAL NOISE SOURCES
The proposed development is considered a noise-sensitive receiving land use and is not expected to include any operational noise source activities that would impact existing residential land uses. Operational noise sources associated with residential development are generally limited to Project construction and maintenance. However, to assess the potential operational noise source activities from the Project, this section analyzes the noise impacts resulting from the operation associated with the proposed air conditioning units, trash enclosure activity, and parking lot movements.
AIR CONDITIONING UNITS
To assess the noise levels generated by the air conditioning units, reference noise levels were taken from equipment specifications for a 3- to 5-ton residential packaged air conditioning unit (Carrier 24ABC6); see Appendix 10.1. The air conditioning units were modeled as operating 45 minutes per hour during the daytime and 30 minutes at night, representing the typical maximum operating time for properly sized AC systems. The air conditioning units are anticipated to be located 3 feet above ground level. At a uniform reference distance of 50 feet, the units would generate a reference noise level of 44.4 dBA Leq. 1743
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
40 EXHIBIT 10-A: OPERATIONAL NOISE SOURCE LOCATIONS
1744
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
41 TRASH ENCLOSURE ACTIVITY
To describe the noise levels associated with trash enclosure activity, Urban Crossroads collected a reference noise level measurement at an existing trash enclosure containing two dumpster bins at the Old Town West Parking structure in the City of Orange. The trash enclosure noise levels describe metal gates opening and closing, metal scraping against concrete floor sounds, dumpster movement on metal wheels, and trash dropping into the metal dumpster. The reference noise levels describe trash enclosure noise activities when trash is dropped into an empty metal dumpster, as would occur at the Project site. The measured reference noise level at the uniform 50-foot reference distance is 72.7 dBA Lmax and 57.4 dBA Leq for the trash enclosure activity. The reference noise level describes the expected noise source activities associated with the Project trash enclosures. Typical trash enclosure activities are estimated to occur for 10 minutes per hour.
PARKING LOT ACTIVITIES
Parking activities are based on the area of the parking spaces. The Project includes approximately 56 new uncovered surface parking spaces on-site. The surface parking spaces are assumed to have up to 2 movements per hour for 112 events per hour. Based on studies conducted in Europe and Australia, the average parking procedure, which included movement associated with either entering or exiting the parking area, parking the vehicles, and opening and closing doors, resulted in a sound power level of approximately 63 dBA Lw/square meter per event (24) (25).
10.2 REFERENCE NOISE LEVELS
To estimate the operational noise impacts, reference noise level measurements were collected from similar types of activities to represent the noise levels expected with the development of the Project. While sound pressure levels (e.g., Leq) quantify in decibels the intensity of given sound sources at a reference distance, sound power levels (Lw) are connected to the sound source and are independent of distance. Sound pressure levels vary substantially with distance from the source and diminish because of intervening obstacles (e.g., walls, buildings, etc.), air absorption, wind, and other factors. Sound power is the acoustic energy emitted by the sound source and is an absolute value not affected by the environment. The reference project operational noise levels are based on the Project related noise sources shown in Exhibit 10-A.
The reference Project's operational sound power levels are summarized in Table 10-1. 1745
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
42 TABLE 10-1: REFERENCE NOISE LEVELS
Noise Source
Noise
Source
Height
(Feet)
Min./Hour4 Sound
Power
Level
(dBA)6
Day Night @ 50
Feet
Air Conditioning Units1 3' 45 30 44.4 76.0
Trash Enclosure Activity2 8' 10 10 57.4 89.0
Parking Lot Movements3 5' 60 60 31.4 63.0
1 Carrier 25HBC5 air conditioning unit, see Appendix 10.1. 2 As measured by Urban Crossroads, Inc.
3 Parking Area Noise, 2007.
4 Anticipated duration (minutes within the hour) of noise activity during typical hourly conditions expected at the Project site.
"Daytime" = 7:00 a.m. to 10:00 p.m.; "Nighttime" = 10:00 p.m. to 7:00 a.m.
10.3 CADNAANOISE PREDICTION MODEL
To fully describe the exterior operational noise levels from the Project, Urban Crossroads, Inc. developed a noise prediction model using the CadnaA (Computer Aided Noise Abatement) computer program. CadnaA can analyze multiple types of noise sources using the spatially accurate Project site plan, georeferenced Nearmap aerial imagery, topography, buildings, and barriers in its calculations to predict outdoor noise levels.
Using the ISO 9613 protocol, CadnaA will calculate the distance from each noise source to the noise receiver locations, using the ground absorption, distance, and barrier/building attenuation inputs to provide a summary of the noise level at each receiver and the partial noise level contributions by noise source. Consistent with the ISO 9613 protocol, the CadnaA noise prediction model relies on the reference sound power level (Lw) to describe individual noise sources. While sound pressure levels (e.g., Leq) quantify in decibels the intensity of given sound sources at a reference distance, sound power levels (Lw) are connected to the sound source and are independent of distance. Sound pressure levels vary substantially with distance from the source and diminish because of intervening obstacles (e.g., walls, buildings, terrain, etc.), air absorption, wind, and other factors. Sound power is the acoustic energy emitted by the sound source and is an absolute value not affected by the environment.
The operational noise level calculations in this noise study account for the distance attenuation provided due to geometric spreading, when sound from a localized stationary source (i.e., a point source) propagates uniformly outward in a spherical pattern. A default ground attenuation factor of 0.5 was used in the noise analysis to account for mixed ground representing a combination of hard and soft surfaces. Appendix 10.2 includes the detailed noise model inputs used to estimate the Project operational noise levels presented in this section.
10.4 PROJECT OPERATIONAL NOISE LEVELS
Using the reference noise levels to represent the Project operations that include air conditioning units, trash enclosure activity, and parking lot movements, Urban Crossroads, Inc. calculated the unmitigated operational source noise levels expected to be generated at the Project site and the Project-related noise level increases that would be experienced at each of 1746
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
43 the sensitive receiver locations. Table 10-2 shows the Project’s operational daytime noise levels. The hourly noise levels at the off-site receiver locations are expected to range from 38.3 to 46.4 dBA Leq. Appendix 10.2 includes the detailed noise model inputs used to estimate the Project operational noise levels presented in this section.
TABLE 10-2: PROJECT DAYTIME OPERATIONAL NOISE LEVELS
Noise Source1 Operational Noise Levels by Receiver Location (dBA Leq) R1 R2 R3 R4 R5 R6
Air Conditioning Units 45.7 37.4 39.8 43.3 38.8 37.9
Trash Enclosure Activity 37.9 30.5 30.3 34.1 29.6 27.9
Parking Lot Movements 27.5 18.6 20.5 24.9 20.8 19.2
Total (All Noise Sources) 46.4 38.3 40.3 43.8 39.4 38.4 1 See Exhibit 10-A for the noise source locations. CadnaA noise model calculations are included in Appendix 10.2.
Table 10-3 shows the Project operational noise levels during the nighttime hours of 10:00 p.m. to 7:00 a.m. The nighttime hourly noise levels at the off-site receiver locations are expected to range from 35.8 to 44.1 dBA Leq. Appendix 10.2 includes the detailed noise model inputs.
TABLE 10-3: PROJECT NIGHTTIME OPERATIONAL NOISE LEVELS
Noise Source1 Operational Noise Levels by Receiver Location (dBA Leq) R1 R2 R3 R4 R5 R6
Air Conditioning Units 43.0 34.7 37.0 40.5 36.0 35.1
Trash Enclosure Activity 36.9 29.6 29.3 33.1 28.6 26.9
Parking Lot Movements 27.5 18.6 20.5 24.9 20.8 19.2
Total (All Noise Sources) 44.1 36.0 37.8 41.3 36.8 35.8 1 See Exhibit 10-A for the noise source locations. CadnaA noise model calculations are included in Appendix 10.2.
10.5 PROJECT OPERATIONAL NOISE LEVEL COMPLIANCE
To demonstrate compliance with local noise regulations, the Project-only operational noise levels are evaluated against exterior noise level thresholds based on the City of Ontario exterior noise level standards at the nearest noise-sensitive receiver locations. Table 10-4 shows the operational noise levels associated with the Project will satisfy the City of Ontario 65 dBA Leq daytime and 45 dBA Leq nighttime exterior noise level standards at all the nearest receiver locations. Therefore, the operational noise impacts are considered less than significant at the nearest noise-sensitive receiver locations.
1747
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
44 TABLE 10-4: OPERATIONAL NOISE LEVEL COMPLIANCE
Receiver
Location1
Project Operational Noise
Levels
(dBA Leq)2
Noise Level Standards
(dBA Leq)3
Noise Level Standards
Exceeded?4
Daytime Nighttime Daytime Nighttime Daytime Nighttime
R1 46.4 44.1 65 45 No No
R2 38.3 36.0 65 45 No No
R3 40.3 37.8 65 45 No No
R4 43.8 41.3 65 45 No No
R5 39.4 36.8 65 45 No No
R6 38.4 35.8 65 45 No No 1
See Exhibit 9-A for the receiver locations.
2 Project operational noise levels as shown in Tables 10-2 and 10-3. 3 City of Ontario Municipal Code, Section 5-29.04 (Appendix 3.1) 4 Do the estimated Project operational noise source activities exceed the noise level standards? "Daytime" = 7:00 a.m. to 10:00 p.m.; "Nighttime" = 10:00 p.m. to 7:00 a.m.
10.6 PROJECT OPERATIONAL NOISE LEVEL INCREASES
To describe the Project operational noise level increases, the Project operational noise levels are combined with the existing ambient noise level measurements for the nearest receiver locations potentially impacted by Project operational noise sources. Since the units used to measure noise, decibels (dB), are logarithmic units, the Project-operational and existing ambient noise levels cannot be combined using standard arithmetic equations. (2) Instead, they must be logarithmically added using the following base equation:
SPLTotal = 10log10[10SPL1/10 + 10SPL2/10 + … 10SPLn/10] Where “SPL1,” “SPL2,” etc. are equal to the sound pressure levels being combined, or in this case, the Project-operational and existing ambient noise levels. The difference between the combined Project and ambient noise levels describes the Project noise level increases to the existing ambient noise environment. Noise levels that would be experienced at receiver locations when Project-source noise is added to the daytime and nighttime ambient conditions are presented in Tables 10-2 and 10-3, respectively.
As indicated in Table 10-5, the Project will generate daytime operational noise level increases ranging from less than 0.1 to 0.8 dBA Leq at the nearest receiver locations. According to Table 10-6, the Project will generate nighttime operational noise level increases ranging from approximately 0.1 to 4.7 dBA Leq at the nearest receiver locations. In effect, the amount to which a given noise level increase is considered acceptable is reduced based on existing ambient noise conditions. Based on the result shown in Tables 10-5 and 10-6, the Projectrelated operational noise level increases will satisfy the operational noise level increase criteria at the nearest sensitive receiver locations, and noise level increases will be less than significant. 1748
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
45 TABLE 10-5: DAYTIME PROJECT OPERATIONAL NOISE LEVEL INCREASES Receiver
Location1
Total
Project
Operational
Noise
Level2
Measurement
Location3
Reference
Ambient
Noise
Levels4
Combined
Project
and
Ambient5
Project
Increase6
Existing
Noise
Sensitive
Land
Use?
Increase
Criteria7
Increase
Criteria
Exceeded?7
R1 46.4 L1 67.9 67.9 0.0 Yes 1.5 No
R2 38.3 L2 45.1 45.9 0.8 Yes 5.0 No
R3 40.3 L3 47.4 48.2 0.8 Yes 5.0 No
R4 43.8 L4 53.2 53.7 0.5 Yes 5.0 No
R5 39.4 L5 60.3 60.3 0.0 Yes 3.0 No
R6 38.4 L6 66.0 66.0 0.0 Yes 1.5 No
1 See Exhibit 9-A for the receiver locations.
2 Total Project daytime operational noise levels as shown in Table 10-3. 3 Reference noise level measurement locations as shown in Exhibit 5-A. 4 Observed daytime ambient noise levels as shown in Table 5-1. 5 Represents the combined ambient conditions plus the Project activities. 6 The noise level increase expected with the addition of the proposed Project activities. 7 Significance increase criteria as shown in Table 4-1.
TABLE 10-6: NIGHTTIME OPERATIONAL NOISE LEVEL INCREASES Receiver
Location1
Total
Project
Operational
Noise
Level2
Measurement
Location3
Reference
Ambient
Noise
Levels4
Combined
Project
and
Ambient5
Project
Increase6
Noise
Sensitive
Land
Use?
Increase
Criteria7
Increase
Criteria
Exceeded?7
R1 44.1 L1 55.3 55.6 0.3 Yes 5.0 No
R2 36.0 L2 36.9 39.5 2.6 Yes 5.0 No
R3 37.8 L3 34.9 39.6 4.7 Yes 5.0 No
R4 41.3 L4 53.3 53.6 0.3 Yes 5.0 No
R5 36.8 L5 53.4 53.5 0.1 Yes 5.0 No
R6 35.8 L6 45.2 45.7 0.5 Yes 5.0 No
1 See Exhibit 9-A for the receiver locations.
2 Total Project nighttime operational noise levels as shown in Table 10-3. 3 Reference noise level measurement locations as shown in Exhibit 5-A. 4 Observed nighttime ambient noise levels as shown in Table 5-1. 5 Represents the combined ambient conditions plus the Project activities. 6 The noise level increase expected with the addition of the proposed Project activities. 7 Significance increase criteria as shown in Table 4-1.
1749
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
46 This page was intentionally left blank.
1750
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
47 11 CONSTRUCTION ANALYSIS
This section analyzes potential impacts resulting from the short-term construction activities associated with the development of the Project. Exhibit 11-A shows the construction activity boundaries in relation to the nearest sensitive receiver locations previously described in Section 9.
To prevent high levels of construction noise from impacting noise-sensitive land uses, section 5-29.09 of the Ontario Municipal Code states: No person, while engaged in construction, remodeling, digging, grading, demolition or any other related building activity, shall operate any tool, equipment or machine in a manner that produces loud noise that disturbs a person of normal sensitivity who works or resides in the vicinity, or a Police or Code Enforcement Officer, on any weekday except between the hours of 7:00 a.m. and 6:00 p.m. or on Saturday or Sunday between the hours of 9:00 a.m. and 6:00 p.m. (12)
While the City establishes limits to the hours during which construction activity may take place, it does not identify specific noise level limits for construction noise levels at potentially affected receiver locations for CEQA analysis purposes. Therefore, a numerical construction threshold based on the Federal Transit Administration (FTA) Transit Noise and Vibration Impact Assessment Manual is used for the analysis of daytime construction impacts. The FTA considers a daytime exterior construction noise level of 80 dBA Leq as a reasonable threshold for noisesensitive residential land use. (8 p. 179).
11.1 CONSTRUCTION NOISE LEVELS
The FTA Transit Noise and Vibration Impact Assessment Manual recognizes that construction projects are accomplished in several different stages and outlines the procedures for assessing noise impacts during construction. Each stage has a specific equipment mix, depending on the work to be completed during that stage. As a result of the equipment mix, each stage has its own noise characteristics; some stages have higher continuous noise levels than others, and some have higher impact noise levels than others. The Project construction activities are expected to occur in the following stages:
• Site Preparation
• Grading
• Building Construction
• Paving
• Architectural Coating
11.2 CONSTRUCTION REFERENCE NOISE LEVELS
To describe construction noise activities, this construction noise analysis was prepared using reference construction equipment noise levels from the Federal Highway Administration (FHWA) published the Roadway Construction Noise Model (RCNM), which includes a national database of construction equipment reference noise emission levels. (26) The RCNM equipment database provides a comprehensive list of the noise-generating characteristics for specific types of construction equipment. In addition, the database provides an acoustical usage 1751
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
48 factor to estimate the fraction of time each piece of construction equipment is operating at full power (i.e., its loudest condition) during a construction operation.
EXHIBIT 11-A: CONSTRUCTION NOISE SOURCE LOCATIONS
1752
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
49 TABLE 11-1: CONSTRUCTION REFERENCE NOISE LEVELS
Construction
Stage
Reference
Construction
Equipmnet1
Reference Noise
Level @ 50 Feet
(dBA Leq)
Composite Reference
Noise Level
(dBA Leq)
Reference
Power Level
(dBA Lw)
Site
Preparation
Tractor 80.0
Front End Loader 75.0 82.9 114.5
Dozer 78.0
Grading
Tractor 80.0
Grader 81.0 84.2 115.9
Compactor (ground) 76.0
Building
Construction
Crane 73.0
Generator 78.0 82.1 113.7
Gradall 79.0
Paving
Paver 74.0
Dump Truck 72.0 77.8 109.5
Roller 73.0
Architectural
Coating
Man Lift 68.0
Compressor (air) 74.0 76.2 107.8
Generator (<25kVA) 70.0 1
FHWA Road Construction Noise Model.
11.3 CONSTRUCTION NOISE ANALYSIS
Using the reference construction equipment noise levels and the CadnaA noise prediction model, calculations of the Project construction noise level impacts at the nearby sensitive receiver locations were completed. Consistent with FTA guidance for general construction noise assessment, Table 11-1 presents the combined noise levels for the loudest construction equipment, assuming they operate at the same time. As shown in Table 11-2, the construction noise levels are expected to range from 59.5 to 67.6 dBA Leq at the nearby receiver locations.
Appendix 11.1 includes the detailed CadnaA construction noise model inputs. 1753
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
50 TABLE 11-2: CONSTRUCTION EQUIPMENT NOISE LEVEL SUMMARY Receiver
Location1
Construction Noise Levels (dBA Leq)
Site
Preparation Grading Building Construction Paving Architectural Coating Highest
Levels2
R1 64.0 65.3 63.2 58.9 57.2 67.6
R2 62.5 63.8 61.7 57.4 55.7 66.1
R3 63.0 64.3 62.2 57.9 56.2 66.6
R4 59.7 61.0 58.9 54.6 52.9 63.3
R5 55.9 57.2 55.1 50.8 49.1 59.5
R6 60.7 62.0 59.9 55.6 53.9 64.3 1 Noise receiver locations are shown in Exhibit 9-A. 2 Construction noise level calculations are based on distance from the construction activity, measured from the Project site boundary to the nearest receiver locations. CadnaA construction noise model inputs are included in Appendix
11.1. 11.4 CONSTRUCTION NOISE LEVEL COMPLIANCE
To evaluate whether the Project will generate potentially significant short-term noise levels at the nearest receiver locations, a construction-related daytime noise level threshold of 80 dBA Leq is used as a reasonable threshold to assess the daytime construction noise level impacts.
The construction noise analysis shows that the nearest receiver locations will satisfy the reasonable daytime 80 dBA Leq significance threshold during Project construction activities, as shown in Table 11-3. Therefore, the noise impacts due to Project construction noise are considered less than significant at all receiver locations.
TABLE 11-3: CONSTRUCTION NOISE LEVEL COMPLIANCE
Receiver
Location1
Construction Noise Levels (dBA Leq)
Highest Construction
Noise Levels2 Threshold3 Threshold Exceeded?4
R1 67.6 80 No
R2 66.1 80 No
R3 66.6 80 No
R4 63.3 80 No
R5 59.5 80 No
R6 64.3 80 No 1 Noise receiver locations are shown in Exhibit 9-A. 2 Highest construction noise level calculations based on distance from the construction noise source activity to the nearest receiver locations, as shown in Table 11-2. 3 Construction noise level thresholds as shown in Table 4-1. 4 Do the estimated Project construction noise levels exceed the construction noise level threshold? 1754
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
51 11.5 CONSTRUCTION VIBRATION ANALYSIS
Construction activity can result in varying degrees of ground vibration, depending on the equipment and methods employed. Operation of construction equipment causes ground vibrations that spread through the ground and diminish in strength with distance. Ground vibration levels associated with various types of construction equipment are summarized in Table 11-4. Based on the representative vibration levels presented for various construction equipment types, it is possible to estimate the potential for human response (annoyance) and building damage using the following vibration assessment methods defined by the FTA. To describe the vibration impacts, the FTA provides the following equation: PPVequip = PPVref x (25/D)1.5
TABLE 11-4: VIBRATION SOURCE LEVELS FOR CONSTRUCTION EQUIPMENT Equipment PPV (in/sec)
at 25 feet
Small bulldozer 0.003
Jackhammer 0.035
Loaded Trucks 0.076
Large bulldozer 0.089
Federal Transit Administration, Transit Noise and Vibration Impact Assessment Manual Table 11-5 presents the expected Project related vibration levels at the nearby receiver locations. At distances ranging from 75 to 202 feet from Project construction activities, construction vibration velocity levels are estimated to range from less than 0.01 to 0.02 in/sec PPV. Based on the maximum acceptable continuous vibration threshold of 0.30 PPV (in/sec), the typical Project construction vibration levels will fall below the building damage thresholds at all the receiver locations. Therefore, the Project-related vibration impacts are considered less than significant during typical construction activities at the Project site. Moreover, the vibration levels reported at the sensitive receiver locations are unlikely to be sustained during the entire construction period but will occur rather only during the times that heavy construction equipment is operating adjacent to the Project site perimeter.
Moreover, the impacts at the site of the nearest sensitive receiver locations are unlikely to be sustained during the entire construction period but will occur rather only during the times that heavy construction equipment is operating adjacent to the Project site perimeter. 1755
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
52 TABLE 11-5: PROJECT CONSTRUCTION VIBRATION LEVELS
Receiver1
Distance
to
Const.
Activity
(Feet)2
Typical Construction Vibration Levels
PPV (in/sec)3 Thresholds
PPV
(in/sec)4
Thresholds
Exceeded?5
Small
bulldozer Jackhammer Loaded Trucks
Large
bulldozer
Highest
Vibration
Level
R1 82' 0.00 0.01 0.01 0.01 0.01 0.3 No
R2 92' 0.00 0.00 0.01 0.01 0.01 0.3 No
R3 75' 0.00 0.01 0.01 0.02 0.02 0.3 No
R4 130' 0.00 0.00 0.01 0.01 0.01 0.3 No
R5 202' 0.00 0.00 0.00 0.00 0.00 0.3 No
R6 142' 0.00 0.00 0.01 0.01 0.01 0.3 No 1 Receiver locations are shown in Exhibit 9-A. 2 Distance from receiver location to Project construction boundary. 3 Based on the Vibration Source Levels of Construction Equipment (Table 10-4). 4 Caltrans Transportation and Construction Vibration Guidance Manual, April 2020, Table 19, p. 38. 5 Does the peak vibration exceed the acceptable vibration thresholds? "PPV" = Peak Particle Velocity
1756
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
53 12 REFERENCES
1. State of California. California Environmental Quality Act, Appendix G. 2018.
2. California Department of Transportation Environmental Program. Technical Noise Supplement - A Technical Supplement to the Traffic Noise Analysis Protocol. Sacramento, CA : s.n., September 2013.
3. Environmental Protection Agency Office of Noise Abatement and Control. Information on Levels of Environmental Noise Requisite to Protect Public Health and Welfare with an Adequate Margin of Safety. March 1974. EPA/ONAC 550/9/74-004.
4. U.S. Department of Transportation, Federal Highway Administration, Office of Environment and Planning, Noise and Air Quality Branch. Highway Traffic Noise Analysis and Abatement Policy and Guidance. December 2011.
5. U.S. Department of Transportation Federal Highway Administration. Highway Noise Barrier Design Handbook. 2001.
6. U.S. Department of Transportation, Federal Highway Administration. Highway Traffic Noise in the United States, Problem and Response. April 2000. p. 3.
7. U.S. Environmental Protection Agency Office of Noise Abatement and Control. Noise Effects Handbook-A Desk Reference to Health and Welfare Effects of Noise. October 1979 (revised July 1981).
EPA 550/9/82/106.
8. U.S. Department of Transportation, Federal Transit Administration. Transit Noise and Vibration Impact Assessment Manual. September 2018.
9. Office of Planning and Research. State of California General Plan Guidlines. October 2019.
10. City of Ontario. The Ontario Plan Safety Section, S4, Noise Hazards. March 2014.
11. —. The Ontario Plan Draft EIR. April 2009.
12. —. Municipal Code, Chapter 29, Section 5- Noise.
13. California Department of Transportation. Transportation and Construction Vibration Guidance Manual. April 2020.
14. City of Ontario. Ontario International Airport Land Use Compatibility Plan. July 2018.
15. State of California. California Environmental Quality Act, Environmental Checklist Form Appendix G. 2021.
16. California Court of Appeal. Gray v. County of Madera, F053661. 167 Cal.App.4th 1099; - Cal.Rptr.3d, October 2008.
17. Federal Interagency Committee on Noise. Federal Agency Review of Selected Airport Noise Analysis Issues. August 1992.
18. California Department of Transportation. Technical Noise Supplement. November 2009.
19. U.S. Department of Transportation, Federal Transit Administration. Transit Noise and Vibration Impact Assessment. May 2006. FTA-VA-90-1003-06.
20. U.S. Department of Transportation, Federal Highway Administration. FHWA Highway Traffic Noise Prediction Model. December 1978. FHWA-RD-77-108.
21. California Department of Transportation Environmental Program, Office of Environmental Engineering. Use of California Vehicle Noise Reference Energy Mean Emission Levels (Calveno REMELs) in FHWA Highway Traffic Noise Prediction. September 1995. TAN 95-03. 1757
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
54 22. Urban Crossroads, Inc. Esperanza Specific Plan Trip Generation Assessment. 2024.
23. California Department of Transportation. Traffic Noise Analysis Protocol. May 2011.
24. Bayerisches Landesamt fur Umwelt. Parking Area Noise, 6. Revised Edition. 2007. ISBN 3-936385-26- 2, ISSN 0723-0028.
25. Prediction of parking area noise in Australian conditions. Johnson, Laurence Nicol and Paul. Paper Number 39, s.l. : Gold Coast, Australia, 2-4 November 2011, Vol. Proceedings of ACOUSTICS 2011.
26. U.S. Department of Transportation, Federal Highway Administration, Office of Environment and Planning. FHWA Roadway Construction Noise Model. January, 2006.
1758
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
55 13 CERTIFICATIONS
The contents of this noise study report represent an accurate depiction of the noise environment and impacts associated with the Esperanza Specific Plan Amendment Project. The information contained in this noise study report is based on the best available data at the time of preparation. If you have any questions, please contact me directly at (619) 788-1971.
William Maddux, INCE
Senior Associate
URBAN CROSSROADS, INC.
(619) 788-1971
[email protected]
EDUCATION
Bachelor of Science in Urban and Regional Planning
California Polytechnic State University, Pomona • June 2000
PROFESSIONAL AFFILIATIONS
INCE – Institute of Noise Control Engineers, Member
ASA – Acoustical Society of America
AEP – Association of Environmental Planners
AWMA – Air and Waste Management Association
PROFESSIONAL CERTIFICATIONS
Approved Acoustical Consultant • County of San Diego
FHWA Traffic Noise Model of Training • November 2004
CadnaA Basic and Advanced Training Certificate • October 2008. 1759
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
56 This page was intentionally left blank.
1760
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
APPENDIX 3.1:
CITY OF ONTARIO MUNICIPAL CODE
57 1761
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
This page was intentionally left blank.
58 1762
!"#
"
"$ #" !%&!
!"#
"
"$ #" !%&!
'()*+,-./01234, 5
&##&!&&!6 5#&
& $5&
!&7&
8
&
&!! 9&
&
&!! 8
& :
!&!!
;&& "<
6&
&&&
& =&
&
>
6&
& ?
;&6
& @
!6&
;
&
&A @>& @
&!#6&
&
$B#!
&!
>
C>
&
#>
&
&
6 "8&#&
&!!&
& =
6
&%> C;
&
4DEFGH./FIJFKDELMNMOPQRQSSPRTPRUVMRTWQLPEXF 9
;6#
&!&!!!
YZ[
\&&!
&#>
&&6
&
6
!&%
&
#
=
6 &!
&
!#
%>
&
&!>
#
&&&A Y;Z[
\&
&&
&&#
>
&&6
&&
&
6
! &
&!
&
&!
&&
&
&!
##
&!!
&
;
#
&>&&#
6%#&!
6#
!&
#
=
6A&!
YZ[
&
6&
;&
#
>&&!
;
&
&#
&
&!&!&
! !!
#
>!
&
&&!
;6&!
#
!!
>&&!
;
&
&#
&
&!&!&
!&
&#&!#
#
&&!
&
;
#
&>&&#
6%#&!
6&!
&!
#
!&
#
=
6 Y]?!"""##
"Z 4DEFGH./FI.FKDSPRPOPQRVF 59
1763
!"#
"
"$ #" !%&!
!"#
"
"$ #" !%&!
'
!&
#%!&!
!#&!#% ()*'+&
&,*
&
&&&,
!%
,&&,&&
&!
#
&!#
!&
!##&,&,
&!
&&!
%
&%
!##&,&
+! (+)*'+(&)-&*
&
&-&
.+!&
#
. ,!!
&
/
. ()*'%
!
&!,*
&
&!
,&!+(!0')
!%
&!,
&
'%
!#
&
%1()
%&&!
#
%&
.( ) 2
'%
!#
!
-
,.%&!,.
#
&.&&
#
&!&&&
&#
&&!&
!#
&
&
3 !&
#
!& (!)*4+(!0')*
&
&
#
&
!#
&!
%&
.( )
+
&( )#
#
#
&!
!
#&
#
%&
.( ) ()*5
,&
&!&,(6
)*
&
7&
&
&5
&/&(75/) "
8
&!!#
&
&
,&
##
&!,&!&
!.
&,,,&!%
&
#
&.
,.&&,
&.,&,!
&
!2
&
!#
#
##
&()&
(#)*7
,&*
&&#
!
&
.
&&()&!&!#
&
&
.%
&+
&
&!!!.8
+3
&+&.+
,
()*7&
,&*
&
&
&
!,&!+,
+&
&
,&
&2
,&
,&#
&!!&!
&
!!
&#
&.
#
&&!
&&#
&&
&
%
,&+&
&, (
)*
&
&&*
&
1,
&#
&
.
()*9*
&&.
&%&
!
&!
&!
&!++
&
#%
&!
&&
&&
!
&
%&&.& (3)*9,(
&!,)*
&
%
!
&!
,+
&!+.
#
&! ,
,&
&!!#
&.#
#
&
&
#
&!
:
#
&,(
&!,)
+'%
!
&!
, (1)*9(
&!),
*
&&&
&
&
!&
&&#&
&!#
&.%
&&
%1#
&
&!!
&
&#&&!
&!, :
#
&!,
7&
&
&5
& /&(75/) &! "
8
&!!
&
,&
##2.
&!,
&&
&
&!
!!&&!&.-&
&
%,!
,&
!
(;<!"""##
") =>?@ABCD@EF@G>HIJKLM>NKOIH>POK>H@ 2
&#
!+!
+&!
#%&&-&
9Q&7 '&#.!&
R 9Q&77 '
#.!&
&!+
1R 9Q&777'
.R 9Q&7S2
!&
&#!
R 9Q&S'&
#
&&!
&!
60
1764
!"#
"
"$ #" !%&!
!"#
"
"$ #" !%&!$
'
#
(&!&
&(
)&&!&
&
*
!
&&#
&
*
&%
(&+,&-------../!!
%
&
*)& 012!"""##
"3 456789:;7<=7>?@5ABCADCBE5E@FDGFAGE7 03' #%&
&
&!!
&
%#(&!
!
(
%
&!&
!&)&
HIIJKLMINOPQNRSJRTJSUNVNWNIXYZ HIIJKN[O\]SWLIN^QTJSUNVNWNI_VN\` XaZ TJSUN bJ^N cdeNJfVL^[gUNhL`i`QJYje`i` Yje`i`QJhL`i` - k&l(m!& !no
!no --
l(m!&
* p
q !no !no --- r
( !no !no -. m!&
&#
!s !no !no .
&
#
&&!-&!
2
s !no !no
03-#
*&
&/!
&
&!!
*&
&/
*
&!! 03
&
#&!&
##
!
(
&
1 0*3-
&%#
#&(&
&(
&%
&
&
!#
r
(
&
%
&#&(&&
(%&!!
!
%&
!*(
& %
&
&/%
&
!
&(
&&&(
(
!
#
#%& 03'
&
&!!#
*)&#&(##
&&
03!t&! 03o
&
&
&
0&&
&3&/
/
#
&
&!!
%&
(0 3!no#&(!#
0
!
&o%
!%&3 03-&
/&
*&
&/!
&
&!!
%*&/
&!
(
*&!
#
*&
&/ 0!3'
+,&-.
&!!
(
&#!&
(#&%
&&
&!! 0 3#
#
(
#
&&
#
(
03-#
&
&&*
&!(*
%&
%03!##&
&)&
%& /
&!!*
&)&
( 012!"""##
"3 456789:;7<87uD@5ABCADCBE5E@FDGFAGE7 03' #%&&
&
&!!
&
%#(&!
!
(
%
&!&
!&)&
61 1765
!"#
"
"$ #" !%&!
!"#
"
"$ #" !%&!
'(()*+,(-./0-12)13)24-5-6-(78'(()*-9:;<26+(-/03)24-5-6-(=5-;>78 ?@ABCD@ECFGHC@IJKELMBCNKOPOQ@RSHOPO RSHOPOQ@NKOPO TU&VWX!&
!YZ
!YZ TT
VWX!&
[ \
]
!YZ
!YZ T^ X!&
&#
!_
!YZ
!YZ
78T#
[&
&`!
&
&!!
[&
&`
[
&!! 78
&
#&!&
##
!
W
&
a 7[8T
&%#
#&W&
&W
&%
&
&
!#
b
W
&
%
&#&W&&
W%&!!
!
%&
![W
& %
&
&`%
&
!
&W
&&&W
W
!
#
#%& 78c
&
&!!#
[d&#&W##
&&
78!e 78Z
&
&
&
7&&
&8&`
`
#
&
&!!
%&
W7 8!YZ#&W!#
7
!
&Z%
!%&8 78T&
`&
[&
&`!
&
&!!
%[&`
&!
W
[&!
#
[&
&` 7!8c
fg&T^
&!!
W
&#!&
W#&%
&&
&!! 7 8#
#
W
#
&&
#
W
78T#
&
&&[
&!W[
%&
%78!##&
&d&
%& `
&!![
&d&
W 7ah!"""##
"8 i-j>klmn>op>:q-rs02)/4> c
#%&
`
[
!#
`&#
78Z&W
`
W&!
!&
[
W&`
W%
&&
#
%&[W&W
[&
W
##W&
`&
[&
&
[&
W
d!
#
`&#
c
&
! %
&
&&!
&
`
&!&!
!%![W
b
W&W
!
%
&
b
Wtu
!
&[
&!c
&
!%
& &
!
&
[!&
%
&&!&
&&
`&
`!!
`&
&!
!
&
&`
d
&&
[[W
[&
W#W
&&&&b
Wb
&e 7[8h&
!
&
[!&
%
&&!&
&&
`&
`!!! `&
&!
!
&
&
![W
u
!
&
`
&#!`&
e 78Z&W
&!`
&
!
!
&&
!%
&W
&W`
%]%&&[`!!
&!&#&W[&&W[
!&
`
&
&%
&#
W#`7
8&
&&W
#
[&
`
!e 7!8f
!%
&
&!&!
&!&#&W
WU
`
&
![
[u
`&#a e 78f
!%
&
&!&!
&!&#
[
# %W!
&
d!
`We 62
1766
!"#
"
"$ #" !%&!
!"#
"
"$ #" !%&!
'#()
&!*
&
!%
&*!!
'(+
&!&
,-
%&" &! .
'(/
&&!
&
0!#
&*#
!
& !#
&
#
!
!*%
&!
&. '$(/
&&!
&
!%
&
!
&*!!
&!&!&%
!-1
&&#!-1
2#&3
&
#)
. '(4
!%
&
&&#
1/
*
&
!-
-5
* ". '
()&1
*
1
&
&
#
-&
!-1
#!%. '()&1&
!%
&!
!%
1
!&
1 /
&
-
-5
*&#+
26 . '5()&1&
&
&#&
,%
&
2
1/
&
-
-5
*&#+
26
"
. ',()&1&
!%
-,&!
&
&
&!-1&&&1 1%
&
2
1/
&
-
-5
*&#+
22
7
. '(4
!
*!-1
!*&
&
!
!
!
#!
&#
&!
&
&
&
&!!&!
&#*7
&
&1--!
&
##
*!#
2
1*!
!*&
&
'6+!"""##
"( 89:;<=>?;@A;BCDEFGEEHIJDKLHGMGCHI9; '(N
&%#
#&1&
1%&%
&
2
1
,
%
-!&1
!*
*&
*&!
-&
&
!
-
#&1
!#
&&1&
&1&-&#&&
*
&
#
2!O&#&
+##
#
!
&
1%&&!!
#,&
&7
1#
!!
-&*
*&
*&1&
!-
&
-
!
1&
&
&%
&&&1&
&
&
&
&
&&1
!
&#&1
&
&!,&
&!#1& !* '-(7
#
&!!&!&!
&
1-&!!&!
&&%
*
&#
*&#
&
-&
!&
!!-
&
!
#%& '(7
*#
&. '(7
*&!&
&
1#
-,
&!'-&
(&#&1. '$(7
1#
&
!&
&. '
(7
&
&!0&&#
%
&%
&&
. '(7
!&
1#&
-
&#
%
&%
&&
. ' (7
#!1&!&
&
. '(7
!
&#
&. '"(P
&&
&
&
&
&
. '(
&!
!-1&&
*
1.&! ' (P
%#
&!
*
#
2!&!%
&&
!&-1-
!#
*
1%!
63
1767
!"#
"
"$ #" !%&!
!"#
"
"$ #" !%&!
'()!"""##
"* +,-./012.34.5,6789:8,9;<=6>?;,?6?-,?:>@,9,AB76;>:?@. '*C&% &!&&
&&#
D
&D
&
& &&&
!
!&
!
E&#&&
F
D%
%G!&
F&
D
H!I&#&
)##
E
%&
#" &! 'E*J&
&&
#
&%
&
&
&DE%! E
%&
#" &! &%G!D&!E
%&
# &! &K
!DK
&!D '*J
#
&%!E%
&D
!ED!&
&#&&%&D!!F%D
&!
D
&DE%!E
%&
#" &! &%G!D&!E
%&
# &! &K
!D K
&!D '!*C&!%&!&
D&
&&F&
E&
D
%&D&&%G&
&!
!
&&
&D
&
&&F
&#
F&#
& '*I
&J
F&#
&
&
D
#%& '*I&D
D&
&&
!ED
E
!&##L '*J
&
&&F&
#&D
E%G#
DED
EDED&D &&
&
&
E%G&
ED&D&&#&
%G
&
!
&#&E
##&D
E&DLF!!
%F
&
&
D
H
D
D&
&
& '*J
H
D
&!
&
!!
&
&
&&F&
!
D&D
&
&
EF '*J
&
&&F&
#&
&&
#EDE&!
!!
& &E
&
'*J
H
DH
&
F!M
#
&&
F&&&F&&
!
&
#D
N&
&&!
&
#
!D
%
!
%E
E
!
&
&L&! '$*O&D&
&&
%
&
#!&(
'()!"""##
"* +,-./012.32.P:?@;9B-;>:?6-;>Q>;<?:>@,9,AB76;>:?@. '*C&% &!&&
&!&!&!&!
&&D
! E
!&
F
D
&D
&
&&&&
!
!&
!
E&#&&
F
D%
%G!&
F&
D
H!I&#&
)##&&D%G!D
E
%&
# &! &K
!DK
&!D E
%&
# &! 'E*C&!%&&
&&D%&&
E&
D
% &D&&%G&
&!
!
&&!&
&D
&
&& F
&#
F&#
& '*I
& '*J
F&#
&
&
D
&D&
&%G#!EDF
D%
&
N!ED
H
D
&
!&L '*J
&
&&F&
#&D
E%G#
DED
EDED&D &&
&
&
E%G&
ED&D&&#&
64 1768
!"#
"
"$ #" !%&!
!"#
"
"$ #" !%&!
%'
&
!
&#&(
##&)
(&)*+!!
%+
&
&
)
,
)
)&
&
& -./
,
)
&!
&
!!
&
&
&&+&
!
)&)
&
&
(+ -./
&
&&+&
#&
&&
#()(&!
!!
& &(
&
-./
,
),
&
+!0
#
&&
+&&&+&&
!
&
#)
1&
&!
&
#
!)
%
!
%(
(
!
&
&*&! -$.2&)&
&
%
&
#!&33
-34!"""##
". 56789:;<8=>8?@A6BCDEFG7HI6J7K6L76C@GMJN8 / +&#
&
(&
!
(
&)%'
!##&
()
&!
!
&#&)
(&)
(+
)&&#&
)&) -34!"""##
". 56789:;<8==857AMMFNOPHK7HB676J@6BNO7ADB7A6NOFGEBHBG6NOQDN6DQNOA6HF@A7HB6GJN@G@D@GMJNR5C67GHF CBMSGNGMJN8 T
&%#
#&)&
&)&
!&+
&)
!) &
&
&
()
%
&
!
&
&!!#!&3
(!#
&!UV&T -34!"""##
". 56789:;<8=;85MDJPHQCFGWKGJI6XDGCQ6J@8 Y !'
&!#
(!!)
!+
!
#)
&!
(
(0
+$Z
&!#)&
&
&
(&
!
&
!
&!+&
!&(
&
!
!
)
!
!)
$
)
')(!
)&
1!)
+&%
!&!&!
! #&
!&
)%
&(
!&&!&
!&!
!
&+)
&+
&)
&!
&
!&
!
(
!&%
!&+
&!
!&) ()
&
#
+
&%
&
! -34!"""##
". 56789:;<8=[8\QCFGWG6PNMDJP8 -./
,
),
&&
#%&
&#
#
&&!
&
(
#
#
)&!%##
1&)]
&1&
#
&!#)&
&
)(&
!
&
&()
&
&
##!#
&!()
,
),
&#&!
&!
(#
)&!
+
#
1&#
&
)
+)&!#!#
(&
&#
!&!
&&)&&(
& #
&!&&#
##)&
&
&)T&&+&
+
1
&
!
&(%
!()&#
&
&)
!&
&
#&)
!
((!
#)&
&
-(.T
&%#
#&)&
&&&#%&#&
+&&
&
&
!'
&!#)&!+&#!+(
&
&
!
&&)+
%
&
,
)#
#+&&
&!
&
'!!
&)&(#&&
&&)
)!%''
(
) %
!#
,
#
!&U
%
&!&&)
+&#
+&#
&
)
#
&!#)&
&
&
(+
)%
&
!&&&
&%
!&!
(+
+&
%
65
1769
!"#
"
"$ #" !%&!
!"#
"
"$ #" !%&!"
&
!&
!#!'(!%
&
(
)
'
&!!')
&&
&!!* +&&!
&&
&#
(&
%'
!'
)&&
#
!&&
&
&
!&
),
(
!&- *+
#
&
#
& *+,
.
#
!&
/!
(&!
&!
& *!+0&
&#
!')
&
'#!%
.
#
&* + !)&!&
&&
&!!
%&
)* +!)
!
&%
&!#)&
&
&
&!!
'
!0
&#(&
(!')
1
0&!&
#
2&
! 3
.&
&
#
&
#
&#
%&
&
#&!&!
(&
%&
&
&
&#&!
&,
&
&
&
#%&&#
& *+,
&!!&!
&&
'#'
%&&!
#
&!#)&
&
4 *+,
&&
'#
&!
5
'
!4 *$+0&!
&#
&!#)&
&
%
'
!4 *
+6
&!#)&
&
%'
!#&&
4 *+,
!
&!
&&!%
&%
&!
)(
&%
&
!
'
!4 * +,
&&#&*+&%
%'&
!
&
&!
#&)
(
#%
&
&!%
%
(
)
!
(
#&)
&!#)&
&
!
&
#
(
#
!
&
&!
%
&
&%
(&#
4 *+0
&
')
&
%&&!'
)%
(&#
&!
&!
&#
4&! *"+05
#
#
%
&%
(
'&!
!%
!&&&!
&#
&&!&
&#
&!#)&
&
*+,
.
#
!&)
&(5&)
#
##&!&)#
#%& *+,
&&
&
)#&
&
&)!&&#
&4 *+,
#
&!#)&
&
&(&
(
)!%'
!&
& '
!&
/!
#
)#
)
&#
'
&
(
)(&
&
'
&!
&!!
'
!')
2&# 7
!&1.!
'!
#
&8
.,
&!"4 *$+,
#
&!#)&
&
&(&
(
)!&
&'
!&
5!
&
5&#
&
&!&
!(&
(
)
&!
'
&!!
#
&8
.,
4 *
+,
&!
&#&)
(
(&
&
&&
#
&
%
!&
&
&&'&
#&%
###
)4 *+,
&!
&#!
&(&
#
&
%
!&
!
&
###
)4 * +,
&
'
!')
&
(
&
%
!(
(&#
&&)
(&##!
&!%4 *+,
&
&%&
&'
)%
(&#
&)&!
& !
&&)
!4 *"+,
!!)'&
!(&
&
&!!
&%
&
%
&!!* +)! !
#
&
&!!
&&!
!(&
%
!&!&
)/&!
)& 66
1770
!"#
"
"$ #" !%&!
!"#
"
"$ #" !%&!
'
()&
&
(
!)%
&
*$+&
&
&!!,&
-
&
')
#
(
&*"+. *+/
&
&
!,
,
&%
&
&!'&!&
0
!&
#
-
#
&%
!(&
'
&
&
#
& *#+1&!
&&%
#
&
%
!&
&
&&(&
#&%
!
&
###
'
-
#
&!(
&
&'(
!
*+/
,
&&!!#,
&!!
&
##&
!#
. *+/
&
#
!
#
&
&!
&
&
##
&. *$+2,(
'#
##&
#
&#
&
%
&#&
'&
#&%
##
&. *
+
'
'
&!&!#
%
#
&
!&&
##
&. *+
'
(
'&
&
&
'
3!
&!
&%
#
&
&
3!('&#
&!&'
!
!,#,
!
& *+1
&!& *+1#
&,!
-
#
&&,!'#
&
&
&!
/
&
&#
#
&!#'&
&
! *+2&'
&#!
(
,!!,!%
&#,*+!'#
#&
# *$+1#
&!,!
-
#
&!,!'#
%
&
%
%
&
&
&
&#!, *+2&'&,!('!&#
-
#
!&'#&
-
'
&2
&!
(#!%
-
'-)%
&
&* +&!!' #
&
(0
#
1#
&
#
#&%
&
&* +!'#& !,!!
&!&
)##
!
'
&
&#
#&!2
(&%
&&!
&
&
#%&&#
&*+&*+#
&#&
*(+ (#
&
&!&'&!&&
#
#
&!*+
&
#
&!&
&!
&!!2#
,&
-
'-)
!
' #%!
-
'
&#
&!& *+/
-
'
&
&
#
#
&(#
-
'
&
&##2&'
&##
(&!
&'&3!!
!&
!('
-
'
&/
&
(
#&
&
&* +&!!'#
#
&&
!&&
!
('
&
4
#
&
(,&&%
&&!!
#,*+&!!'
!
#
&(' 56%
##,
!!!!
!!
!&
&
%
&#!##&
#
&/
&
&!#
&
&#
!&&!
&!%
&%(
! *+/
-
'
&
&##
%
&
&* +&!!'#%&
&
&#
&)%
&#&!&&!!&%
(!,!
-
'&!
&
('#
4
%
&!&&',&&
-!
!&#
-
'
&
&##
(
#&!&
,!&#
-
'2&'
'!
#!%
!&#
-
'
&
&##'),%#
!&
&!
,&#-!-,
!
77
&!
"&!!#
*
+1&!!
&
&'
,&#
-!
#
&!#'&
&
&!
&!
) &
-
'
(
(0
#%&
& *+/
&'
&!
!
&!
&
. 67
1771
!"#
"
"$ #" !%&!
!"#
"
"$ #" !%&!
'()
&!
&
*
!%
&&
&!!' (+!#
&!,
+ -. '$(/
0
#
&!
*&
!
%&
*
!*#!
&&#&
&!!' (#
#
&!#+&
&
&!
1&!
0
&
&&*+
!
2&!
*&&
&
&%
&
&#%!
!*
+. '
(/
&!#+&
&
&!
1
&
*
!*
%&
#" &! " '34!"""##
"( 56789:;<8=>8?@A@BC6DE7F6G8 /
#&+
0
&
&!
&
0
0&
0&
*
!/
!
&
&#
#&+&
&*
&&&
&+
&
!&%
*
0
&
!&
+%
&
!
!
##
!0%
!
0
&
0&
0&
*
!
0
+%
&
&#
,#&H
,!
'34!"""##
"( 56789:;<8=98I@EG6F6C6FJ6KGLB6J6MA8 '(/
&
!#
&
&0&!&
*
&+
# 0
+!
!1*&+&+
!#
&
0
+&!!&
#!*+
%&#
! *+&
&
%&
&
#
##
!
+
!#!&
& 0
&!!/
&+*
&
&
0
+!
&
!1*&+
&
*
!&
*
!&&&
&
0
+
&
&
&
*!*0&
&
+&#&
&
&+
!
#
+!
!1*&+/
&
!#
&
&0&&&!&
*
&
&
/
&
&
*#0'(#
*0 #&
0
&&
#!1*&+
&
&
*#0'(#
*0
#&
!#0 '*(/
&
!#
&&
&0
*!%
&
##
!!&
&
/
&
*!
&
#
'
(#
#
%&#%
&
##%&!%&&&
&
/
&
*!%
%&!%& &&
&
'(N&+!*
&
!
&
0&#
*
!&!* '!ON(
!%
&!0
&
N%
!
&!
0 '34!"""##
"( 56789:;<8=P8QBEJKRK7E6CE@FKAE@M8 N&+&!&
&0
&!!#!&33
&!
*!!
* #0!�
&#
0&#
'34!"""##
"( 56789:;<8=S8Q6MKFAT8 '(N&+&% &&
+1&%&+0
&+0&#
*
+#& &#
&&!
&&0
&
*
&
**+#&#!&4
,3 U
!+0
&
&
##&&!
*
&
*
'*(N&+&%
&&
+1&%&+0
&+0&#
+*
*2
#&'(#!&
!&
0
&
!
##&
#
&4
,3
/
&&#
&!&
0
&
+%
!
#!&4
,,
/
68
1772
!"#
"
"$ #" !%&!
!"#
"
"$ #" !%&!
'()&!!
&!*
&&
&&#&*!+&
&
+
&*& +
&#&*+&#
%
&&
&&
&!+ !&
%,
&!!#!&
,!!&!!!
,
, &
&&!*,
,-
,
&
,*
&&!&-
&
&
!,*
#
&
-
!
& '!()&*+
&#
!!
,
,&
&&!*,,
!&!&%
%.
&#&#&
!!
,
,&
&&!*,,*
&#
/
*/
&!!
,&&!&
&
*&%
&
& &
&!&!&*
,&,
&#
*%& '01!"""##
"( 234567895:;5<=>?@43A3=BC=DCDAE=EFB@CBE?=5 '(G
,
&,
*#
/!H&#&
1##
&#
+&#
&!
#
#
&
&
!,*
I
!
&
!,
&
,
!
&+
&
&
+
&
&%&&&
&!
&&!+!&+!&
/
*
#
& ',(J+
�
/!H&#&
1##
,
&!
&
&!&
* #-
*#
%'(!&
+&&
!%
&
*' (!*!
&&!
#
#%& '(.
!&
!&
#!&
&
,
!
!%
&
%
&!!' (*!#
&
K&! '(L
&
&
!&
!&#
,
&
*&!
&&*&#
!&
'$(M
&#
%'(!&
!
++
� ,
&
!
+
&
+
!&*
+&#
'01!"""##
"( 234567895:95NEBOPC=CQ3@RCES3@5 .
/
*
&
T!
&
*%+
+&#
#!#
&*
+
&#
#
*%+%
!,&
,&
&!
&#,&!
!&
&
+
+
*
!#&!
&
+
*# %
*%+
.
!*&
!
&
&
! &&*!&!&
&&
&*&
%
&
*'$ (!*#&
& '01!"""##
"( 2345678958U5V?EF3CWCB3A3=BX@?Q@CA5 '(G&
&%
!
!
&
*%!&
&!!&!+
& &
&&&
!##
/
*/
&*
,
&,
&
&T
#
&
&!##
!
*&!
&
T!
&
',(Y,
&
#
&!
+!
&!
&&!
&
#
+&
&%
&
&!!&!I!
&!
&&!
&
*&
!,
&
,
!
&
&
,
&&
&
&#
&&!
*#
&
'01!"""##
"( 69
1773
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
This page was intentionally left blank.
70 1774
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
APPENDIX 5.1:
STUDY AREA PHOTOS
71 1775
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
This page was intentionally left blank.
72 1776
15662 - Esperanza Specific Plan
15662_L1_C 1.North
33, 59' 35.790000"117, 33' 43.600000"
15662_L1_C 2.South
33, 59' 35.780000"117, 33' 43.600000"
15662_L1_C 3.East
33, 59' 35.780000"117, 33' 43.490000"
15662_L1_C 4.West
33, 59' 35.780000"117, 33' 43.520000"
73 1777
15662 - Esperanza Specific Plan
15662_L2_E 1.North
33, 59' 36.710000"117, 33' 45.250000"
15662_L2_E 2.South
33, 59' 36.490000"117, 33' 44.370000"
15662_L2_E 3.East
33, 59' 36.490000"117, 33' 44.310000"
15662_L2_E 4.West
33, 59' 36.430000"117, 33' 44.290000"
74 1778
15662 - Esperanza Specific Plan
15662_L3_J 1.North
33, 59' 35.420000"117, 33' 47.360000"
15662_L3_J 2.South
33, 59' 35.420000"117, 33' 47.330000"
15662_L3_J 3.East
33, 59' 35.450000"117, 33' 47.310000"
15662_L3_J 4.West
33, 59' 35.420000"117, 33' 47.360000"
75 1779
15662 - Esperanza Specific Plan
15662_L4_L 1.North
33, 59' 31.850000"117, 33' 50.490000"
15662_L4_L 2.South
33, 59' 31.610000"117, 33' 50.690000"
15662_L4_L 3.East
33, 59' 31.590000"117, 33' 50.630000"
15662_L4_L 4.West
33, 59' 31.640000"117, 33' 50.660000"
76 1780
15662 - Esperanza Specific Plan
15662_L5_O 1.North
33, 59' 26.240000"117, 33' 45.190000"
15662_L5_O 2.South
33, 59' 26.200000"117, 33' 45.190000"
15662_L5_O 3.East
33, 59' 26.160000"117, 33' 45.220000"
15662_L5_O 4.West
33, 59' 26.160000"117, 33' 45.250000"
77 1781
15662 - Esperanza Specific Plan
15662_L6_S 1.North
33, 59' 29.250000"117, 33' 42.970000"
15662_L6_S 2.South
33, 59' 29.130000"117, 33' 43.020000"
15662_L6_S 3.East
33, 59' 29.130000"117, 33' 42.990000"
15662_L6_S 4.West
33, 59' 29.110000"117, 33' 43.020000"
78 1782
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
APPENDIX 5.2:
NOISE LEVEL MEASUREMENTS
79 1783
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
This page was intentionally left blank.
80 1784
Date: Location: Meter: Piccolo II JN: 15662
Project: Ontario Esperanza PA-11 Source: Analyst: Z. Ibrahim Timeframe Hour L eq L max L min L1% L2% L5% L8% L25% L50% L90% L95% L99% L eq Adj. Adj. L eq 0 49.6 53.5 47.4 53.1 52.8 52.1 51.6 50.0 49.1 48.0 47.8 47.5 49.6 10.0 59.61 48.7 52.5 46.7 52.3 51.9 51.1 50.4 49.1 48.3 47.3 47.1 46.8 48.7 10.0 58.72 48.9 53.0 46.6 52.8 52.5 51.6 50.8 49.3 48.4 47.2 46.9 46.7 48.9 10.0 58.93 49.4 52.8 47.5 52.6 52.3 51.6 51.2 49.9 49.1 48.0 47.8 47.5 49.4 10.0 59.44 53.1 57.3 51.4 57.0 56.5 55.4 54.7 53.3 52.7 51.8 51.7 51.5 53.1 10.0 63.15 55.5 62.5 53.0 61.9 61.2 59.4 58.0 55.4 54.4 53.5 53.3 53.1 55.5 10.0 65.56 61.7 70.1 55.6 69.9 69.5 67.9 66.3 61.6 58.6 56.3 56.0 55.7 61.7 10.0 71.77 61.3 69.3 57.3 69.0 68.5 66.9 65.5 60.9 59.1 57.7 57.6 57.4 61.3 0.0 61.38 69.7 77.8 60.2 77.5 76.8 75.4 74.5 70.7 66.2 62.0 61.4 60.6 69.7 0.0 69.79 62.9 71.7 57.3 71.3 70.7 68.8 67.5 62.4 60.1 58.0 57.7 57.4 62.9 0.0 62.9 10 70.8 79.7 57.8 79.0 78.3 76.7 75.6 71.4 67.6 61.1 59.6 58.2 70.8 0.0 70.8 11 71.0 80.3 57.6 79.5 78.7 76.6 75.4 71.7 68.1 61.5 60.2 58.3 71.0 0.0 71.012 72.3 81.8 57.0 81.2 80.5 78.7 77.3 72.7 68.6 61.5 59.8 57.6 72.3 0.0 72.313 71.6 80.2 57.3 79.6 78.9 77.4 76.4 72.4 68.6 62.0 60.3 58.0 71.6 0.0 71.614 70.7 79.4 56.4 78.7 78.1 76.6 75.5 71.6 67.7 60.7 59.1 57.2 70.7 0.0 70.715 66.8 74.9 54.0 74.3 73.6 72.2 71.4 67.9 64.3 57.9 56.4 54.6 66.8 0.0 66.816 64.1 73.1 51.5 72.3 71.6 70.1 68.8 64.9 60.8 54.5 53.3 52.0 64.1 0.0 64.117 63.7 72.5 51.8 72.0 71.2 69.3 68.2 64.6 60.9 54.6 53.6 52.2 63.7 0.0 63.718 58.9 67.8 50.3 67.2 66.5 64.5 63.1 59.3 56.2 52.1 51.3 50.6 58.9 0.0 58.919 54.3 60.8 51.0 60.3 59.7 58.4 57.5 54.6 52.9 51.5 51.3 51.1 54.3 5.0 59.320 50.7 54.0 49.2 53.6 53.2 52.5 52.2 51.1 50.4 49.6 49.4 49.3 50.7 5.0 55.721 53.3 56.7 51.8 56.5 56.2 55.3 54.8 53.6 53.0 52.2 52.0 51.9 53.3 5.0 58.322 55.5 61.0 53.2 60.7 60.3 59.2 58.1 55.4 54.5 53.7 53.5 53.3 55.5 10.0 65.523 54.4 57.0 52.7 56.7 56.5 56.0 55.8 54.9 54.2 53.3 53.1 52.8 54.4 10.0 64.4 Timeframe Hour L eq L max L min L1% L2% L5% L8% L25% L50% L90% L95% L99% Min 50.7 54.0 49.2 53.6 53.2 52.5 52.2 51.1 50.4 49.6 49.4 49.3 Max 72.3 81.8 60.2 81.2 80.5 78.7 77.3 72.7 68.6 62.0 61.4 60.6
67.9 71.5 70.8 69.3 68.2 64.7 61.6 57.1 56.2 55.1
Min 48.7 52.5 46.6 52.3 51.9 51.1 50.4 49.1 48.3 47.2 46.9 46.7 Max 61.7 70.1 55.6 69.9 69.5 67.9 66.3 61.6 58.6 56.3 56.0 55.7
55.3 57.4 57.1 56.0 55.2 53.2 52.1 51.0 50.8 50.6
Night
Day
Leq (dBA) 24-Hour
Day CNEL
Night
Energy AverageEnergy Average Average:
Average:
Daytime
(7am-10pm)
Nighttime
(10pm-7am)
67.1 67.9 55.3
24-Hour Noise Level Measurement Summary
Hourly L eq dBA Readings (unadjusted)
Night
Wednesday, October 4, 2023 L1 - Located East of the site at future residential
49.6 48.7
48.9 49.4
53.1 55.5
61.7 61.3
69.7 62.9
70.8 71.0
72.3 71.6
70.7 66.8
64.1 63.7
58.9 54.3
50.7 53.3
55.5 54.4
35.040.045.050.055.060.065.070.075.080.085.0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Hourly Leq (dBA)
Hour Beginning
Z:\Shared\UcJobs\_15600-16000\_15600\15662\04_Noise\fieldwork\Measurements\15662_L1_C.xlsx 81 1785
Date: Location: Meter: Piccolo II JN: 15662
Project: Ontario Esperanza PA-11 Source: Analyst: Z. Ibrahim Timeframe Hour L eq L max L min L1% L2% L5% L8% L25% L50% L90% L95% L99% L eq Adj. Adj. L eq 0 29.7 32.7 28.0 32.4 32.1 31.5 31.1 30.1 29.4 28.4 28.2 28.0 29.7 10.0 39.71 30.7 33.8 28.9 33.6 33.3 32.6 32.2 31.1 30.5 29.4 29.2 29.0 30.7 10.0 40.72 30.1 33.4 28.0 33.2 33.0 32.2 31.7 30.6 29.7 28.6 28.4 28.1 30.1 10.0 40.13 30.1 32.9 28.6 32.7 32.5 32.0 31.6 30.4 29.9 29.0 28.9 28.7 30.1 10.0 40.14 34.9 38.1 33.3 37.8 37.4 36.8 36.2 35.1 34.6 33.8 33.6 33.4 34.9 10.0 44.95 38.9 49.8 34.5 48.9 47.7 45.1 42.5 36.7 35.7 34.9 34.8 34.6 38.9 10.0 48.96 43.5 52.6 36.6 52.3 51.9 50.0 48.1 43.4 40.3 37.1 36.9 36.7 43.5 10.0 53.57 44.7 55.1 38.4 54.5 53.7 51.5 49.5 43.7 40.2 38.8 38.7 38.5 44.7 0.0 44.78 54.4 60.7 43.0 60.3 60.0 59.1 58.5 56.0 52.6 45.8 44.5 43.3 54.4 0.0 54.49 42.7 53.5 34.7 53.1 52.5 50.6 48.4 39.6 36.7 35.1 35.0 34.8 42.7 0.0 42.7 10 46.2 54.8 38.4 54.2 53.8 52.2 50.3 46.1 43.8 40.6 39.6 38.6 46.2 0.0 46.2 11 43.5 52.8 32.1 52.2 51.5 49.6 48.3 44.1 40.2 34.5 33.6 32.5 43.5 0.0 43.512 43.9 52.5 33.1 51.7 50.8 49.4 48.4 44.8 41.4 36.1 34.9 33.5 43.9 0.0 43.913 42.7 51.5 32.3 50.7 49.9 48.0 46.9 43.5 40.3 34.9 33.8 32.7 42.7 0.0 42.714 42.1 50.2 32.7 49.3 48.6 47.2 46.2 42.9 40.1 35.6 34.6 33.2 42.1 0.0 42.115 41.1 49.3 31.5 48.7 48.0 46.4 45.2 41.8 38.9 34.0 33.1 32.0 41.1 0.0 41.116 37.5 46.3 29.0 45.8 45.2 43.4 42.1 37.8 34.4 30.6 30.0 29.3 37.5 0.0 37.517 37.6 46.6 29.5 46.1 45.5 43.3 41.9 37.9 34.7 31.1 30.5 29.7 37.6 0.0 37.618 38.6 46.5 32.0 45.9 45.4 44.1 43.0 39.3 36.0 33.0 32.6 32.1 38.6 0.0 38.619 37.2 40.3 35.9 40.1 39.8 38.8 38.3 37.4 37.0 36.3 36.2 36.0 37.2 5.0 42.220 34.8 36.3 33.8 36.2 36.0 35.7 35.6 35.0 34.8 34.1 34.0 33.8 34.8 5.0 39.821 35.4 38.5 34.1 38.2 37.9 37.1 36.5 35.5 35.1 34.4 34.3 34.1 35.4 5.0 40.422 35.7 39.4 34.1 39.1 38.9 38.3 37.8 35.8 35.2 34.5 34.4 34.2 35.7 10.0 45.723 35.2 37.2 33.8 37.0 36.8 36.5 36.2 35.5 35.0 34.3 34.1 33.8 35.2 10.0 45.2 Timeframe Hour L eq L max L min L1% L2% L5% L8% L25% L50% L90% L95% L99% Min 34.8 36.3 29.0 36.2 36.0 35.7 35.6 35.0 34.4 30.6 30.0 29.3 Max 54.4 60.7 43.0 60.3 60.0 59.1 58.5 56.0 52.6 45.8 44.5 43.3
45.1 48.5 47.9 46.4 45.3 41.7 39.1 35.7 35.0 34.3
Min 29.7 32.7 28.0 32.4 32.1 31.5 31.1 30.1 29.4 28.4 28.2 28.0 Max 43.5 52.6 36.6 52.3 51.9 50.0 48.1 43.4 40.3 37.1 36.9 36.7
36.9 38.6 38.2 37.2 36.4 34.3 33.4 32.2 32.1 31.8
Night
Day
Leq (dBA) 24-Hour
Day CNEL
Night
Energy AverageEnergy Average Average:
Average:
Daytime
(7am-10pm)
Nighttime
(10pm-7am)
46.0 45.1 36.9
24-Hour Noise Level Measurement Summary
Hourly L eq dBA Readings (unadjusted)
Night
Wednesday, October 4, 2023 L2 - Located Northwest of the site at future residential
38.9 43.5
44.7 54.4
42.7 46.2
43.5 43.9
42.7 42.1
41.1 37.5
37.6 38.6
37.2 35.4
35.7 35.2
35.040.045.050.055.060.065.070.075.080.085.0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Hourly Leq (dBA)
Hour Beginning
Z:\Shared\UcJobs\_15600-16000\_15600\15662\04_Noise\fieldwork\Measurements\15662_L2_E.xlsx 82 1786
Date: Location: Meter: Piccolo II JN: 15662
Project: Ontario Esperanza PA-11 Source: Analyst: Z. Ibrahim Timeframe Hour L eq L max L min L1% L2% L5% L8% L25% L50% L90% L95% L99% L eq Adj. Adj. L eq 0 29.5 32.6 27.8 32.4 32.0 31.5 31.2 29.9 29.2 28.3 28.1 27.8 29.5 10.0 39.51 29.6 33.4 27.8 33.2 32.9 32.2 31.5 29.8 29.2 28.2 28.1 27.8 29.6 10.0 39.62 29.9 32.7 28.1 32.5 32.2 31.7 31.4 30.4 29.6 28.6 28.4 28.2 29.9 10.0 39.93 30.3 33.3 28.8 33.0 32.7 32.1 31.5 30.6 30.1 29.3 29.1 28.9 30.3 10.0 40.34 34.1 38.1 32.3 37.7 37.4 36.6 35.9 34.3 33.5 32.8 32.6 32.4 34.1 10.0 44.15 36.4 41.4 34.4 41.0 40.5 39.5 38.5 36.6 35.7 34.8 34.7 34.5 36.4 10.0 46.46 40.0 47.3 36.2 47.1 46.9 45.4 44.0 39.6 37.8 36.7 36.5 36.3 40.0 10.0 50.07 42.0 50.0 38.1 49.8 49.6 48.4 46.7 40.6 39.2 38.4 38.3 38.2 42.0 0.0 42.08 50.4 57.0 40.1 56.7 56.3 55.4 54.6 51.6 48.3 43.0 41.7 40.3 50.4 0.0 50.49 38.2 47.5 33.9 47.2 46.8 44.8 42.3 36.9 35.2 34.3 34.2 34.0 38.2 0.0 38.2 10 50.5 57.2 42.4 56.7 56.2 55.0 54.2 51.6 49.2 45.0 44.1 42.8 50.5 0.0 50.5 11 49.7 56.8 40.4 56.4 55.9 54.7 53.9 50.9 47.9 43.0 41.9 40.9 49.7 0.0 49.712 51.8 58.6 43.0 58.1 57.3 56.2 55.4 52.8 50.4 46.0 45.1 43.6 51.8 0.0 51.813 50.6 56.8 42.0 56.3 55.8 54.8 54.1 51.8 49.4 45.0 43.9 42.4 50.6 0.0 50.614 49.9 56.1 41.6 55.6 55.3 54.3 53.5 51.1 48.7 44.5 43.4 42.1 49.9 0.0 49.915 47.0 54.0 37.8 53.4 52.8 51.7 50.8 48.1 45.7 40.8 39.6 38.2 47.0 0.0 47.016 44.2 50.9 35.6 50.4 49.9 48.7 48.0 45.4 42.9 38.3 37.3 36.0 44.2 0.0 44.217 43.4 49.0 35.9 48.6 48.3 47.4 46.8 44.6 42.3 38.3 37.3 36.3 43.4 0.0 43.418 42.1 53.8 32.4 52.6 51.6 47.1 45.0 42.3 38.5 33.9 33.4 32.7 42.1 0.0 42.119 34.7 39.2 31.8 38.8 38.5 37.8 37.2 35.5 34.0 32.4 32.2 31.9 34.7 5.0 39.720 31.5 35.0 30.2 34.8 34.5 33.6 33.0 31.8 31.1 30.5 30.4 30.2 31.5 5.0 36.521 35.3 39.0 33.9 38.8 38.5 37.6 36.9 35.4 34.9 34.3 34.2 34.0 35.3 5.0 40.322 36.5 42.3 34.2 41.9 41.5 40.3 39.4 36.2 35.4 34.6 34.5 34.3 36.5 10.0 46.523 34.7 37.1 33.2 36.8 36.6 36.2 35.9 35.1 34.5 33.7 33.5 33.3 34.7 10.0 44.7 Timeframe Hour L eq L max L min L1% L2% L5% L8% L25% L50% L90% L95% L99% Min 31.5 35.0 30.2 34.8 34.5 33.6 33.0 31.8 31.1 30.5 30.4 30.2 Max 51.8 58.6 43.0 58.1 57.3 56.2 55.4 52.8 50.4 46.0 45.1 43.6
47.4 50.3 49.8 48.5 47.5 44.7 42.5 39.2 38.5 37.6
Min 29.5 32.6 27.8 32.4 32.0 31.5 31.2 29.8 29.2 28.2 28.1 27.8 Max 40.0 47.3 36.2 47.1 46.9 45.4 44.0 39.6 37.8 36.7 36.5 36.3
34.9 37.3 37.0 36.2 35.5 33.6 32.8 31.9 31.7 31.5
Night
Day
Leq (dBA) 24-Hour
Day CNEL
Night
Energy AverageEnergy Average Average:
Average:
Daytime
(7am-10pm)
Nighttime
(10pm-7am)
46.7 47.4 34.9
24-Hour Noise Level Measurement Summary
Hourly L eq dBA Readings (unadjusted)
Night
Wednesday, October 4, 2023 L3 - Located North of the site at future park site
36.4 40.0
42.0 50.4
38.2 50.5
49.7 51.8
50.6 49.9
47.0 44.2
43.4 42.1
35.3 36.5
35.040.045.050.055.060.065.070.075.080.085.0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Hourly Leq (dBA)
Hour Beginning
Z:\Shared\UcJobs\_15600-16000\_15600\15662\04_Noise\fieldwork\Measurements\15662_L3_J.xlsx 83 1787
Date: Location: Meter: Piccolo II JN: 15662
Project: Ontario Esperanza PA-11 Source: Analyst: Z. Ibrahim Timeframe Hour L eq L max L min L1% L2% L5% L8% L25% L50% L90% L95% L99% L eq Adj. Adj. L eq 0 48.1 52.1 46.1 51.8 51.4 50.4 50.0 48.5 47.7 46.6 46.4 46.2 48.1 10.0 58.11 47.4 50.5 45.7 50.3 50.0 49.4 49.1 47.8 47.1 46.2 45.9 45.7 47.4 10.0 57.42 48.1 51.4 46.1 51.1 50.9 50.3 49.8 48.6 47.6 46.5 46.4 46.1 48.1 10.0 58.13 48.7 51.4 47.2 51.2 50.9 50.4 50.0 49.1 48.5 47.6 47.4 47.3 48.7 10.0 58.74 52.7 57.3 50.8 56.8 56.5 55.6 54.7 53.0 52.0 51.2 51.1 50.9 52.7 10.0 62.75 54.2 57.6 52.6 57.3 56.9 56.2 55.6 54.5 53.8 53.0 52.8 52.6 54.2 10.0 64.26 57.6 63.7 54.8 63.4 63.1 62.2 61.3 57.3 56.1 55.3 55.1 54.9 57.6 10.0 67.67 57.8 61.1 56.3 60.9 60.6 59.9 59.3 58.0 57.4 56.7 56.5 56.4 57.8 0.0 57.88 56.1 58.3 54.5 58.1 57.8 57.4 57.2 56.5 55.9 55.0 54.8 54.6 56.1 0.0 56.19 54.2 57.1 52.7 56.8 56.5 56.0 55.5 54.6 53.9 53.1 53.0 52.8 54.2 0.0 54.2 10 53.0 58.5 50.5 57.9 57.4 56.1 55.4 53.3 52.1 51.0 50.8 50.6 53.0 0.0 53.0 11 51.5 56.1 48.8 55.7 55.3 54.4 53.8 52.2 50.9 49.4 49.1 48.9 51.5 0.0 51.512 53.8 60.9 48.8 60.4 59.7 58.6 57.7 54.7 51.6 49.5 49.2 48.9 53.8 0.0 53.813 51.6 57.6 48.4 57.1 56.6 55.5 54.8 52.0 50.4 49.0 48.8 48.5 51.6 0.0 51.614 51.0 56.5 48.2 56.1 55.7 54.4 53.6 51.3 50.2 48.9 48.6 48.3 51.0 0.0 51.015 51.2 57.2 47.5 56.7 56.0 54.9 54.4 52.2 49.8 48.1 47.8 47.5 51.2 0.0 51.216 50.0 56.1 46.9 55.4 54.9 53.5 52.5 50.6 49.0 47.5 47.2 47.0 50.0 0.0 50.017 50.6 57.4 47.0 56.8 56.2 55.1 54.0 51.1 48.8 47.6 47.4 47.1 50.6 0.0 50.618 52.2 59.9 48.3 59.5 59.2 57.7 56.6 51.6 50.1 48.8 48.6 48.4 52.2 0.0 52.219 51.5 57.3 49.0 56.7 56.2 54.9 54.3 51.8 50.5 49.4 49.3 49.1 51.5 5.0 56.520 49.6 54.4 47.4 53.8 53.3 52.4 51.9 50.2 48.7 47.8 47.7 47.5 49.6 5.0 54.621 54.0 57.9 52.2 57.5 57.1 56.3 55.8 54.3 53.6 52.7 52.5 52.3 54.0 5.0 59.022 55.4 60.3 53.2 60.0 59.6 58.5 57.7 55.5 54.7 53.7 53.6 53.3 55.4 10.0 65.423 54.5 57.6 52.7 57.3 57.0 56.4 56.0 54.9 54.1 53.2 53.0 52.8 54.5 10.0 64.5 Timeframe Hour L eq L max L min L1% L2% L5% L8% L25% L50% L90% L95% L99% Min 49.6 54.4 46.9 53.8 53.3 52.4 51.9 50.2 48.7 47.5 47.2 47.0 Max 57.8 61.1 56.3 60.9 60.6 59.9 59.3 58.0 57.4 56.7 56.5 56.4
53.2 57.3 56.8 55.8 55.1 53.0 51.5 50.3 50.1 49.9
Min 47.4 50.5 45.7 50.3 50.0 49.4 49.1 47.8 47.1 46.2 45.9 45.7 Max 57.6 63.7 54.8 63.4 63.1 62.2 61.3 57.3 56.1 55.3 55.1 54.9
53.3 55.5 55.1 54.4 53.8 52.1 51.3 50.4 50.2 50.0
Night
Day
Leq (dBA) 24-Hour
Day CNEL
Night
Energy AverageEnergy Average Average:
Average:
Daytime
(7am-10pm)
Nighttime
(10pm-7am)
59.9 53.2 53.3
24-Hour Noise Level Measurement Summary
Hourly L eq dBA Readings (unadjusted)
Night
Wednesday, October 4, 2023 L4 - Located West of the site near the residence at 4500 S.
Amherst Ave.
48.1 47.4
48.1 48.7
52.7 54.2
57.6 57.8
56.1 54.2
53.0 51.5
53.8 51.6
51.0 51.2
50.0 50.6
52.2 51.5
49.6 54.0
55.4 54.5
35.040.045.050.055.060.065.070.075.080.085.0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Hourly Leq (dBA)
Hour Beginning
Z:\Shared\UcJobs\_15600-16000\_15600\15662\04_Noise\fieldwork\Measurements\15662_L4_L.xlsx 84 1788
Date: Location: Meter: Piccolo II JN: 15662
Project: Ontario Esperanza PA-11 Source: Analyst: Z. Ibrahim Timeframe Hour L eq L max L min L1% L2% L5% L8% L25% L50% L90% L95% L99% L eq Adj. Adj. L eq 0 53.8 57.1 51.9 56.9 56.7 55.8 55.3 54.4 53.4 52.5 52.3 52.1 53.8 10.0 63.81 46.2 50.5 44.2 50.3 50.1 49.4 48.5 46.4 45.6 44.6 44.5 44.3 46.2 10.0 56.22 47.6 51.1 45.7 50.9 50.6 49.9 49.3 48.0 47.1 46.1 45.9 45.8 47.6 10.0 57.63 48.7 55.1 45.8 54.8 54.4 53.5 52.4 48.6 47.0 46.2 46.1 45.9 48.7 10.0 58.74 52.4 59.4 49.7 59.0 58.6 56.8 55.3 52.1 51.0 50.1 49.9 49.7 52.4 10.0 62.45 54.2 60.1 51.9 59.8 59.5 58.0 56.7 54.1 53.2 52.3 52.1 51.9 54.2 10.0 64.26 58.4 66.9 53.6 66.6 66.3 64.3 62.6 57.9 55.5 54.1 53.9 53.7 58.4 10.0 68.47 61.6 70.7 55.0 70.4 69.8 67.9 66.1 61.7 58.5 55.4 55.2 55.0 61.6 0.0 61.68 61.0 72.7 53.7 72.1 71.2 67.9 65.3 58.8 55.8 54.2 54.0 53.8 61.0 0.0 61.09 58.3 68.0 52.4 67.6 67.1 65.4 63.7 56.5 54.1 52.8 52.6 52.4 58.3 0.0 58.3 10 61.7 70.2 54.1 69.5 68.8 67.2 66.2 62.1 59.2 55.8 55.2 54.4 61.7 0.0 61.7 11 62.2 70.2 54.7 69.5 68.8 67.0 66.0 62.8 60.3 56.7 55.9 55.0 62.2 0.0 62.212 62.6 70.4 54.2 69.9 69.4 67.8 66.6 63.3 60.7 56.3 55.4 54.5 62.6 0.0 62.613 63.0 71.2 54.4 70.5 70.0 68.4 67.3 63.6 60.9 56.5 55.7 54.6 63.0 0.0 63.014 63.5 71.6 54.7 71.1 70.6 68.9 67.8 64.3 61.3 56.9 56.0 54.9 63.5 0.0 63.515 60.6 68.8 52.2 68.4 67.7 65.8 64.7 61.3 58.5 54.4 53.6 52.6 60.6 0.0 60.616 57.2 65.5 49.9 65.1 64.6 62.6 61.2 57.5 54.9 51.4 50.7 50.0 57.2 0.0 57.217 56.8 64.5 50.0 64.0 63.6 61.9 60.6 57.4 54.9 51.5 50.9 50.2 56.8 0.0 56.818 55.1 63.0 49.6 62.6 62.1 60.4 59.2 55.3 52.8 50.5 50.2 49.7 55.1 0.0 55.119 53.1 61.2 48.9 60.9 60.4 58.5 57.2 52.7 50.7 49.3 49.1 49.0 53.1 5.0 58.120 57.6 68.8 52.3 68.1 67.1 64.6 61.4 55.2 54.1 52.8 52.7 52.5 57.6 5.0 62.621 53.1 60.3 50.6 59.8 59.3 57.2 55.9 52.9 51.9 51.0 50.9 50.7 53.1 5.0 58.122 54.1 62.5 50.9 62.2 61.6 59.0 57.1 53.5 52.2 51.3 51.2 51.0 54.1 10.0 64.123 52.3 56.4 50.4 56.2 55.8 55.0 54.4 52.6 51.7 50.8 50.7 50.5 52.3 10.0 62.3 Timeframe Hour L eq L max L min L1% L2% L5% L8% L25% L50% L90% L95% L99% Min 53.1 60.3 48.9 59.8 59.3 57.2 55.9 52.7 50.7 49.3 49.1 49.0 Max 63.5 72.7 55.0 72.1 71.2 68.9 67.8 64.3 61.3 56.9 56.0 55.0
60.3 67.3 66.7 64.8 63.3 59.0 56.6 53.7 53.2 52.6
Min 46.2 50.5 44.2 50.3 50.1 49.4 48.5 46.4 45.6 44.6 44.5 44.3 Max 58.4 66.9 53.6 66.6 66.3 64.3 62.6 57.9 55.5 54.1 53.9 53.7
53.4 57.4 57.1 55.8 54.6 52.0 50.7 49.8 49.6 49.4
Night
Day
Leq (dBA) 24-Hour
Day CNEL
Night
Energy AverageEnergy Average Average:
Average:
Daytime
(7am-10pm)
Nighttime
(10pm-7am)
62.0 60.3 53.4
24-Hour Noise Level Measurement Summary
Hourly L eq dBA Readings (unadjusted)
Night
Wednesday, October 4, 2023 L5 - Located South of the site near the residence at 4576 S Afton Privado
53.8 46.2
47.6 48.7
52.4 54.2
58.4 61.6
61.0 58.3
61.7 62.2
62.6 63.0
63.5 60.6
57.2 56.8
55.1 53.1
57.6 53.1
54.1 52.3
35.040.045.050.055.060.065.070.075.080.085.0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Hourly Leq (dBA)
Hour Beginning
Z:\Shared\UcJobs\_15600-16000\_15600\15662\04_Noise\fieldwork\Measurements\15662_L5_O.xlsx 85 1789
Date: Location: Meter: Piccolo II JN: 15662
Project: Ontario Esperanza PA-11 Source: Analyst: Z. Ibrahim Timeframe Hour L eq L max L min L1% L2% L5% L8% L25% L50% L90% L95% L99% L eq Adj. Adj. L eq 0 48.6 56.5 45.2 56.2 55.6 53.0 51.3 48.4 47.2 45.8 45.6 45.3 48.6 10.0 58.61 49.6 53.5 47.7 53.3 53.0 52.3 51.6 49.9 49.2 48.3 48.0 47.7 49.6 10.0 59.62 48.7 53.5 46.1 53.3 53.0 52.0 51.2 49.1 47.8 46.6 46.4 46.1 48.7 10.0 58.73 50.2 57.0 46.9 56.8 56.5 55.5 54.2 49.8 48.2 47.3 47.1 46.9 50.2 10.0 60.24 53.9 61.8 50.8 61.6 61.1 58.9 56.9 53.3 52.2 51.3 51.1 50.9 53.9 10.0 63.95 55.0 61.5 52.4 61.3 60.9 59.2 57.7 54.9 53.8 52.9 52.7 52.5 55.0 10.0 65.06 59.6 68.9 53.9 68.7 68.3 66.2 64.1 58.5 55.9 54.4 54.1 53.9 59.6 10.0 69.67 61.3 71.8 55.2 71.4 70.7 67.9 65.7 60.0 57.1 55.7 55.5 55.3 61.3 0.0 61.38 62.0 73.6 54.1 73.3 72.4 69.1 66.2 59.7 56.3 54.5 54.4 54.2 62.0 0.0 62.09 61.7 72.6 53.3 72.4 71.9 69.3 66.9 59.3 55.2 53.8 53.6 53.4 61.7 0.0 61.7 10 68.3 77.4 54.8 76.9 76.3 75.1 73.5 68.5 64.0 57.5 56.4 55.1 68.3 0.0 68.3 11 69.0 78.7 53.8 78.1 77.5 75.9 74.5 69.3 63.7 56.5 55.3 54.1 69.0 0.0 69.012 69.8 78.7 54.4 78.2 77.6 76.2 75.1 70.7 66.0 57.2 56.1 54.8 69.8 0.0 69.813 69.9 78.1 55.4 77.7 77.3 76.0 75.0 70.9 66.0 59.1 57.8 55.8 69.9 0.0 69.914 71.2 79.7 56.7 79.3 78.9 77.3 76.1 72.2 67.7 60.9 59.5 57.4 71.2 0.0 71.215 65.3 73.9 52.4 73.5 72.9 71.3 70.1 66.1 62.4 55.0 53.9 52.8 65.3 0.0 65.316 60.8 70.4 49.6 69.9 69.1 67.0 65.5 61.0 57.4 51.9 51.0 50.0 60.8 0.0 60.817 61.7 70.7 49.8 70.1 69.4 67.8 66.5 62.1 58.6 52.2 51.2 50.1 61.7 0.0 61.718 59.9 70.3 50.2 69.4 68.6 65.9 64.3 59.6 56.5 52.0 51.2 50.4 59.9 0.0 59.919 54.7 64.5 48.3 64.1 63.5 60.9 59.2 53.9 50.9 48.9 48.6 48.4 54.7 5.0 59.720 57.6 70.3 48.0 69.9 69.0 65.0 61.4 53.7 50.4 48.5 48.3 48.1 57.6 5.0 62.621 55.0 64.5 50.7 64.1 63.4 60.7 58.7 54.2 52.3 51.2 51.0 50.8 55.0 5.0 60.022 55.2 64.4 51.0 63.9 63.1 60.5 58.6 54.6 52.6 51.5 51.3 51.1 55.2 10.0 65.223 53.1 58.2 50.6 57.9 57.6 56.6 55.7 53.3 52.3 51.2 50.9 50.7 53.1 10.0 63.1 Timeframe Hour L eq L max L min L1% L2% L5% L8% L25% L50% L90% L95% L99% Min 54.7 64.5 48.0 64.1 63.4 60.7 58.7 53.7 50.4 48.5 48.3 48.1 Max 71.2 79.7 56.7 79.3 78.9 77.3 76.1 72.2 67.7 60.9 59.5 57.4
66.0 72.6 71.9 69.7 67.9 62.8 59.0 54.3 53.6 52.7
Min 48.6 53.5 45.2 53.3 53.0 52.0 51.2 48.4 47.2 45.8 45.6 45.3 Max 59.6 68.9 53.9 68.7 68.3 66.2 64.1 58.5 55.9 54.4 54.1 53.9
54.2 59.2 58.8 57.1 55.7 52.4 51.0 49.9 49.7 49.5
Night
Day
Leq (dBA) 24-Hour
Day CNEL
Night
Energy AverageEnergy Average Average:
Average:
Daytime
(7am-10pm)
Nighttime
(10pm-7am)
65.5 66.0 54.2
24-Hour Noise Level Measurement Summary
Hourly L eq dBA Readings (unadjusted)
Night
Wednesday, October 4, 2023 L6 - Located South of the site near the residence at 4554 S Afton Privado
48.6 49.6
48.7 50.2
53.9 55.0
59.6 61.3
62.0 61.7
68.3 69.0
69.8 69.9
71.2 65.3
60.8 61.7
59.9 54.7
57.6 55.0
55.2 53.1
35.040.045.050.055.060.065.070.075.080.085.0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Hourly Leq (dBA)
Hour Beginning
Z:\Shared\UcJobs\_15600-16000\_15600\15662\04_Noise\fieldwork\Measurements\15662_L6_S.xlsx 86 1790
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
APPENDIX 8.1:
ON-SITE MODEL INPUTS
87 1791
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
This page was intentionally left blank.
88 1792
FHWA-RD-77-108 HIGHWAY NOISE PREDICTION MODEL (CALVENO) - v10/31/19
SITE SPECIFIC INPUT DATA
Project Name: Esperanza Specific Plan
Job Number: 15662
Lot No: BLDG 20 Analyst: B. Maddux
Road Name: Eucalyptus Ave
Scenario: Backyard No Wall
21,700
10%
83.0 NOISE MODEL INPUTS
Average Daily Traffic (Adt):
Peak Hour Percentage:
Peak Hour Volume: 2,170 vehicles
Centerline Dist. to Barrier:
Centerline Dist. to Observer: 105.0
Highway Data
feet
feet
vehicles
Road Elevation: 0.0
Barrier Elevation: 0.0
Pad Elevation: 0.0
Site Data
Site Conditions (Hard = 10, Soft = 15)
Medium Trucks (2 Axles): 15
Heavy Trucks (3+ Axles): 15
Autos: 15
Vehicle Mix
feet
feet Lane Equivalent Distance (in feet)
Barrier Height: 0.0
Observer Height (Above Pad): 5.0 feet
feet
Vehicle Speed: 40 mph
Near/Far Lane Distance: 40 feet
REMEL Traffic Flow Distance
1.93 VehicleType Day Evening Night Daily
Medium Trucks:
Heavy Trucks:
Autos: 77.5% 12.9% 9.6% 97.42%
84.8% 4.9% 10.3% 1.84%
86.5% 2.7% 10.8% 0.74%
-3.39
Finite Road
-1.20
Barrier Atten
FHWA Noise Model Calculations
Barrier Distance to Observer: 22.0 feet
Barrier Type (0-Wall, 1-Berm): 0.0
0.000 0.000
Fresnel Berm Atten
Medium Trucks:
Heavy Trucks:
Autos:
VehicleType
-15.31 -3.38 -1.20 0.000 0.000
-19.27 -3.38 -1.20 0.000 0.000
-0.41
-0.55
-0.99
Medium Trucks:
Heavy Trucks:
Autos:
Noise Source Elevations (in feet)
Medium Trucks:
Heavy Trucks:
Autos: 0.00
2.30 8.01
82.765
82.658
82.668
Grade Adjustment: 0.0
Unmitigated Noise Levels (without Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
64.7 62.8 61.0 55.0 63.6 64.2
56.4 57.3
54.9 48.6 47.0 55.5 55.7
55.9 46.9 48.1 56.5 56.6
Vehicle Noise: 65.9 64.2 61.4 56.3 64.9 65.4
Mitigated Noise Levels (with Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
64.7 62.8 61.0 55.0 63.6 64.2
56.4 57.3
54.9 48.6 47.0 55.5 55.7
55.9 46.9 48.1 56.5 56.6
Vehicle Noise: 65.9 64.2 61.4 56.3 64.9 65.4
76.31 81.16
67.36 Road Grade: 1.0%
feet
Wednesday, May 29, 2024
89 1793
FHWA-RD-77-108 HIGHWAY NOISE PREDICTION MODEL (CALVENO) - v10/31/19
SITE SPECIFIC INPUT DATA
Project Name: Esperanza Specific Plan
Job Number: 15662
Lot No: BLDG 7-14 Analyst: B. Maddux
Road Name: Eucalyptus Ave
Scenario: Backyard No Wall
21,700
10%
83.0 NOISE MODEL INPUTS
Average Daily Traffic (Adt):
Peak Hour Percentage:
Peak Hour Volume: 2,170 vehicles
Centerline Dist. to Barrier:
Centerline Dist. to Observer: 103.0
Highway Data
feet
feet
vehicles
Road Elevation: 0.0
Barrier Elevation: 0.0
Pad Elevation: 0.0
Site Data
Site Conditions (Hard = 10, Soft = 15)
Medium Trucks (2 Axles): 15
Heavy Trucks (3+ Axles): 15
Autos: 15
Vehicle Mix
feet
feet Lane Equivalent Distance (in feet)
Barrier Height: 0.0
Observer Height (Above Pad): 5.0 feet
feet
Vehicle Speed: 40 mph
Near/Far Lane Distance: 40 feet
REMEL Traffic Flow Distance
1.93 VehicleType Day Evening Night Daily
Medium Trucks:
Heavy Trucks:
Autos: 77.5% 12.9% 9.6% 97.42%
84.8% 4.9% 10.3% 1.84%
86.5% 2.7% 10.8% 0.74%
-3.22
Finite Road
-1.20
Barrier Atten
FHWA Noise Model Calculations
Barrier Distance to Observer: 20.0 feet
Barrier Type (0-Wall, 1-Berm): 0.0
0.000 0.000
Fresnel Berm Atten
Medium Trucks:
Heavy Trucks:
Autos:
VehicleType
-15.31 -3.21 -1.20 0.000 0.000
-19.27 -3.21 -1.20 0.000 0.000
-0.46
-0.60
-1.04
Medium Trucks:
Heavy Trucks:
Autos:
Noise Source Elevations (in feet)
Medium Trucks:
Heavy Trucks:
Autos: 0.00
2.30 8.01
80.709
80.600
80.610
Grade Adjustment: 0.0
Unmitigated Noise Levels (without Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
64.9 63.0 61.2 55.1 63.8 64.4
56.6 57.5
55.1 48.7 47.2 55.6 55.9
56.1 47.0 48.3 56.6 56.7
Vehicle Noise: 66.1 64.3 61.6 56.5 65.1 65.6
Mitigated Noise Levels (with Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
64.9 63.0 61.2 55.1 63.8 64.4
56.6 57.5
55.1 48.7 47.2 55.6 55.9
56.1 47.0 48.3 56.6 56.7
Vehicle Noise: 66.1 64.3 61.6 56.5 65.1 65.6
76.31 81.16
67.36 Road Grade: 1.0%
feet
Wednesday, May 29, 2024
90 1794
FHWA-RD-77-108 HIGHWAY NOISE PREDICTION MODEL (CALVENO) - v10/31/19
SITE SPECIFIC INPUT DATA
Project Name: Esperanza Specific Plan
Job Number: 15662
Lot No: BLDG 6 Analyst: B. Maddux
Road Name: Eucalyptus Ave
Scenario: Backyard No Wall
21,700
10%
84.0 NOISE MODEL INPUTS
Average Daily Traffic (Adt):
Peak Hour Percentage:
Peak Hour Volume: 2,170 vehicles
Centerline Dist. to Barrier:
Centerline Dist. to Observer: 104.0
Highway Data
feet
feet
vehicles
Road Elevation: 0.0
Barrier Elevation: 0.0
Pad Elevation: 0.0
Site Data
Site Conditions (Hard = 10, Soft = 15)
Medium Trucks (2 Axles): 15
Heavy Trucks (3+ Axles): 15
Autos: 15
Vehicle Mix
feet
feet Lane Equivalent Distance (in feet)
Barrier Height: 0.0
Observer Height (Above Pad): 5.0 feet
feet
Vehicle Speed: 40 mph
Near/Far Lane Distance: 40 feet
REMEL Traffic Flow Distance
1.93 VehicleType Day Evening Night Daily
Medium Trucks:
Heavy Trucks:
Autos: 77.5% 12.9% 9.6% 97.42%
84.8% 4.9% 10.3% 1.84%
86.5% 2.7% 10.8% 0.74%
-3.31
Finite Road
-1.20
Barrier Atten
FHWA Noise Model Calculations
Barrier Distance to Observer: 20.0 feet
Barrier Type (0-Wall, 1-Berm): 0.0
0.000 0.000
Fresnel Berm Atten
Medium Trucks:
Heavy Trucks:
Autos:
VehicleType
-15.31 -3.30 -1.20 0.000 0.000
-19.27 -3.30 -1.20 0.000 0.000
-0.46
-0.60
-1.04
Medium Trucks:
Heavy Trucks:
Autos:
Noise Source Elevations (in feet)
Medium Trucks:
Heavy Trucks:
Autos: 0.00
2.30 8.01
81.737
81.629
81.640
Grade Adjustment: 0.0
Unmitigated Noise Levels (without Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
64.8 62.9 61.1 55.1 63.7 64.3
56.5 57.4
55.0 48.6 47.1 55.5 55.8
56.0 46.9 48.2 56.5 56.7
Vehicle Noise: 66.0 64.2 61.5 56.4 65.0 65.5
Mitigated Noise Levels (with Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
64.8 62.9 61.1 55.1 63.7 64.3
56.5 57.4
55.0 48.6 47.1 55.5 55.8
56.0 46.9 48.2 56.5 56.7
Vehicle Noise: 66.0 64.2 61.5 56.4 65.0 65.5
76.31 81.16
67.36 Road Grade: 1.0%
feet
Wednesday, May 29, 2024
91 1795
FHWA-RD-77-108 HIGHWAY NOISE PREDICTION MODEL (CALVENO) - v10/31/19
SITE SPECIFIC INPUT DATA
Project Name: Esperanza Specific Plan
Job Number: 15662
Lot No: BLDG 5-6 Analyst: B. Maddux
Road Name: Clifton Ave
Scenario: Backyard No Wall
9,500
10%
31.0 NOISE MODEL INPUTS
Average Daily Traffic (Adt):
Peak Hour Percentage:
Peak Hour Volume: 950 vehicles
Centerline Dist. to Barrier:
Centerline Dist. to Observer: 41.0
Highway Data
feet
feet
vehicles
Road Elevation: 0.0
Barrier Elevation: 0.0
Pad Elevation: 0.0
Site Data
Site Conditions (Hard = 10, Soft = 15)
Medium Trucks (2 Axles): 15
Heavy Trucks (3+ Axles): 15
Autos: 15
Vehicle Mix
feet
feet Lane Equivalent Distance (in feet)
Barrier Height: 0.0
Observer Height (Above Pad): 5.0 feet
feet
Vehicle Speed: 25 mph
Near/Far Lane Distance: 12 feet
REMEL Traffic Flow Distance
0.38 VehicleType Day Evening Night Daily
Medium Trucks:
Heavy Trucks:
Autos: 77.5% 12.9% 9.6% 97.42%
84.8% 4.9% 10.3% 1.84%
86.5% 2.7% 10.8% 0.74%
2.25 Finite Road
-1.20
Barrier Atten
FHWA Noise Model Calculations
Barrier Distance to Observer: 10.0 feet
Barrier Type (0-Wall, 1-Berm): 0.0
0.000 0.000
Fresnel Berm Atten
Medium Trucks:
Heavy Trucks:
Autos:
VehicleType
-16.86 2.30 -1.20 0.000 0.000
-20.82 2.29 -1.20 0.000 0.000
-0.81
-1.16
-2.25
Medium Trucks:
Heavy Trucks:
Autos:
Noise Source Elevations (in feet)
Medium Trucks:
Heavy Trucks:
Autos: 0.00
2.30 8.01
34.843
34.588
34.613
Grade Adjustment: 0.0
Unmitigated Noise Levels (without Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
60.9 59.0 57.2 51.1 59.8 60.4
55.3 57.5
53.8 47.5 45.9 54.4 54.6
56.1 47.1 48.3 56.7 56.8
Vehicle Noise: 63.3 61.6 58.0 53.7 62.3 62.7
Mitigated Noise Levels (with Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
60.9 59.0 57.2 51.1 59.8 60.4
55.3 57.5
53.8 47.5 45.9 54.4 54.6
56.1 47.1 48.3 56.7 56.8
Vehicle Noise: 63.3 61.6 58.0 53.7 62.3 62.7
71.09 77.24
59.44 Road Grade: 1.0%
feet
Wednesday, May 29, 2024
92 1796
FHWA-RD-77-108 HIGHWAY NOISE PREDICTION MODEL (CALVENO) - v10/31/19
SITE SPECIFIC INPUT DATA
Project Name: Esperanza Specific Plan
Job Number: 15662
Lot No: BLDG 4 Analyst: B. Maddux
Road Name: Clifton Ave
Scenario: Backyard No Wall
9,500
10%
32.0 NOISE MODEL INPUTS
Average Daily Traffic (Adt):
Peak Hour Percentage:
Peak Hour Volume: 950 vehicles
Centerline Dist. to Barrier:
Centerline Dist. to Observer: 51.0
Highway Data
feet
feet
vehicles
Road Elevation: 0.0
Barrier Elevation: 0.0
Pad Elevation: 0.0
Site Data
Site Conditions (Hard = 10, Soft = 15)
Medium Trucks (2 Axles): 15
Heavy Trucks (3+ Axles): 15
Autos: 15
Vehicle Mix
feet
feet Lane Equivalent Distance (in feet)
Barrier Height: 0.0
Observer Height (Above Pad): 5.0 feet
feet
Vehicle Speed: 25 mph
Near/Far Lane Distance: 12 feet
REMEL Traffic Flow Distance
0.38 VehicleType Day Evening Night Daily
Medium Trucks:
Heavy Trucks:
Autos: 77.5% 12.9% 9.6% 97.42%
84.8% 4.9% 10.3% 1.84%
86.5% 2.7% 10.8% 0.74%
0.60 Finite Road
-1.20
Barrier Atten
FHWA Noise Model Calculations
Barrier Distance to Observer: 19.0 feet
Barrier Type (0-Wall, 1-Berm): 0.0
0.000 0.000
Fresnel Berm Atten
Medium Trucks:
Heavy Trucks:
Autos:
VehicleType
-16.86 0.63 -1.20 0.000 0.000
-20.82 0.63 -1.20 0.000 0.000
-0.36
-0.65
-1.71
Medium Trucks:
Heavy Trucks:
Autos:
Noise Source Elevations (in feet)
Medium Trucks:
Heavy Trucks:
Autos: 0.00
2.30 8.01
44.878
44.680
44.699
Grade Adjustment: 0.0
Unmitigated Noise Levels (without Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
59.2 57.3 55.6 49.5 58.1 58.7
53.7 55.9
52.1 45.8 44.2 52.7 52.9
54.4 45.4 46.6 55.0 55.1
Vehicle Noise: 61.6 59.9 56.4 52.1 60.6 61.0
Mitigated Noise Levels (with Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
59.2 57.3 55.6 49.5 58.1 58.7
53.7 55.9
52.1 45.8 44.2 52.7 52.9
54.4 45.4 46.6 55.0 55.1
Vehicle Noise: 61.6 59.9 56.4 52.1 60.6 61.0
71.09 77.24
59.44 Road Grade: 1.0%
feet
Wednesday, May 29, 2024
93 1797
FHWA-RD-77-108 HIGHWAY NOISE PREDICTION MODEL (CALVENO) - v10/31/19
SITE SPECIFIC INPUT DATA
Project Name: Esperanza Specific Plan
Job Number: 15662
Lot No: BLDG 4 Analyst: B. Maddux
Road Name: Chatham St
Scenario: Backyard No Wall
9,500
10%
25.0 NOISE MODEL INPUTS
Average Daily Traffic (Adt):
Peak Hour Percentage:
Peak Hour Volume: 950 vehicles
Centerline Dist. to Barrier:
Centerline Dist. to Observer: 33.0
Highway Data
feet
feet
vehicles
Road Elevation: 0.0
Barrier Elevation: 0.0
Pad Elevation: 0.0
Site Data
Site Conditions (Hard = 10, Soft = 15)
Medium Trucks (2 Axles): 15
Heavy Trucks (3+ Axles): 15
Autos: 15
Vehicle Mix
feet
feet Lane Equivalent Distance (in feet)
Barrier Height: 0.0
Observer Height (Above Pad): 5.0 feet
feet
Vehicle Speed: 25 mph
Near/Far Lane Distance: 12 feet
REMEL Traffic Flow Distance
0.38 VehicleType Day Evening Night Daily
Medium Trucks:
Heavy Trucks:
Autos: 77.5% 12.9% 9.6% 97.42%
84.8% 4.9% 10.3% 1.84%
86.5% 2.7% 10.8% 0.74%
3.96 Finite Road
-1.20
Barrier Atten
FHWA Noise Model Calculations
Barrier Distance to Observer: 8.0 feet
Barrier Type (0-Wall, 1-Berm): 0.0
0.000 0.000
Fresnel Berm Atten
Medium Trucks:
Heavy Trucks:
Autos:
VehicleType
-16.86 4.04 -1.20 0.000 0.000
-20.82 4.03 -1.20 0.000 0.000
-0.95
-1.41
-2.82
Medium Trucks:
Heavy Trucks:
Autos:
Noise Source Elevations (in feet)
Medium Trucks:
Heavy Trucks:
Autos: 0.00
2.30 8.01
26.796
26.463
26.496
Grade Adjustment: 0.0
Unmitigated Noise Levels (without Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
62.6 60.7 58.9 52.9 61.5 62.1
57.1 59.3
55.6 49.2 47.7 56.1 56.3
57.8 48.8 50.1 58.4 58.5
Vehicle Noise: 65.0 63.3 59.7 55.5 64.0 64.4
Mitigated Noise Levels (with Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
62.6 60.7 58.9 52.9 61.5 62.1
57.1 59.3
55.6 49.2 47.7 56.1 56.3
57.8 48.8 50.1 58.4 58.5
Vehicle Noise: 65.0 63.3 59.7 55.5 64.0 64.4
71.09 77.24
59.44 Road Grade: 1.0%
feet
Wednesday, May 29, 2024
94 1798
FHWA-RD-77-108 HIGHWAY NOISE PREDICTION MODEL (CALVENO) - v10/31/19
SITE SPECIFIC INPUT DATA
Project Name: Esperanza Specific Plan
Job Number: 15662
Lot No: BLDG 1-3 Analyst: B. Maddux
Road Name: Chatham St
Scenario: Backyard No Wall
9,500
10%
25.0 NOISE MODEL INPUTS
Average Daily Traffic (Adt):
Peak Hour Percentage:
Peak Hour Volume: 950 vehicles
Centerline Dist. to Barrier:
Centerline Dist. to Observer: 35.0
Highway Data
feet
feet
vehicles
Road Elevation: 0.0
Barrier Elevation: 0.0
Pad Elevation: 0.0
Site Data
Site Conditions (Hard = 10, Soft = 15)
Medium Trucks (2 Axles): 15
Heavy Trucks (3+ Axles): 15
Autos: 15
Vehicle Mix
feet
feet Lane Equivalent Distance (in feet)
Barrier Height: 0.0
Observer Height (Above Pad): 5.0 feet
feet
Vehicle Speed: 25 mph
Near/Far Lane Distance: 12 feet
REMEL Traffic Flow Distance
0.38 VehicleType Day Evening Night Daily
Medium Trucks:
Heavy Trucks:
Autos: 77.5% 12.9% 9.6% 97.42%
84.8% 4.9% 10.3% 1.84%
86.5% 2.7% 10.8% 0.74%
3.49 Finite Road
-1.20
Barrier Atten
FHWA Noise Model Calculations
Barrier Distance to Observer: 10.0 feet
Barrier Type (0-Wall, 1-Berm): 0.0
0.000 0.000
Fresnel Berm Atten
Medium Trucks:
Heavy Trucks:
Autos:
VehicleType
-16.86 3.56 -1.20 0.000 0.000
-20.82 3.55 -1.20 0.000 0.000
-0.74
-1.17
-2.59
Medium Trucks:
Heavy Trucks:
Autos:
Noise Source Elevations (in feet)
Medium Trucks:
Heavy Trucks:
Autos: 0.00
2.30 8.01
28.810
28.501
28.531
Grade Adjustment: 0.0
Unmitigated Noise Levels (without Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
62.1 60.2 58.4 52.4 61.0 61.6
56.6 58.8
55.1 48.7 47.2 55.6 55.9
57.4 48.3 49.6 57.9 58.1
Vehicle Noise: 64.5 62.8 59.2 55.0 63.5 63.9
Mitigated Noise Levels (with Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
62.1 60.2 58.4 52.4 61.0 61.6
56.6 58.8
55.1 48.7 47.2 55.6 55.9
57.4 48.3 49.6 57.9 58.1
Vehicle Noise: 64.5 62.8 59.2 55.0 63.5 63.9
71.09 77.24
59.44 Road Grade: 1.0%
feet
Wednesday, May 29, 2024
95 1799
FHWA-RD-77-108 HIGHWAY NOISE PREDICTION MODEL (CALVENO) - v10/31/19
SITE SPECIFIC INPUT DATA
Project Name: Esperanza Specific Plan
Job Number: 15662
Lot No: BLDG 27-28 Analyst: B. Maddux
Road Name: Chatham St
Scenario: Backyard No Wall
9,500
10%
25.0 NOISE MODEL INPUTS
Average Daily Traffic (Adt):
Peak Hour Percentage:
Peak Hour Volume: 950 vehicles
Centerline Dist. to Barrier:
Centerline Dist. to Observer: 43.0
Highway Data
feet
feet
vehicles
Road Elevation: 0.0
Barrier Elevation: 0.0
Pad Elevation: 0.0
Site Data
Site Conditions (Hard = 10, Soft = 15)
Medium Trucks (2 Axles): 15
Heavy Trucks (3+ Axles): 15
Autos: 15
Vehicle Mix
feet
feet Lane Equivalent Distance (in feet)
Barrier Height: 0.0
Observer Height (Above Pad): 5.0 feet
feet
Vehicle Speed: 25 mph
Near/Far Lane Distance: 12 feet
REMEL Traffic Flow Distance
0.38 VehicleType Day Evening Night Daily
Medium Trucks:
Heavy Trucks:
Autos: 77.5% 12.9% 9.6% 97.42%
84.8% 4.9% 10.3% 1.84%
86.5% 2.7% 10.8% 0.74%
1.88 Finite Road
-1.20
Barrier Atten
FHWA Noise Model Calculations
Barrier Distance to Observer: 18.0 feet
Barrier Type (0-Wall, 1-Berm): 0.0
0.000 0.000
Fresnel Berm Atten
Medium Trucks:
Heavy Trucks:
Autos:
VehicleType
-16.86 1.93 -1.20 0.000 0.000
-20.82 1.92 -1.20 0.000 0.000
-0.34
-0.71
-2.13
Medium Trucks:
Heavy Trucks:
Autos:
Noise Source Elevations (in feet)
Medium Trucks:
Heavy Trucks:
Autos: 0.00
2.30 8.01
36.851
36.610
36.634
Grade Adjustment: 0.0
Unmitigated Noise Levels (without Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
60.5 58.6 56.8 50.8 59.4 60.0
55.0 57.1
53.4 47.1 45.5 54.0 54.2
55.7 46.7 47.9 56.3 56.4
Vehicle Noise: 62.9 61.2 57.6 53.4 61.9 62.3
Mitigated Noise Levels (with Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
60.5 58.6 56.8 50.8 59.4 60.0
55.0 57.1
53.4 47.1 45.5 54.0 54.2
55.7 46.7 47.9 56.3 56.4
Vehicle Noise: 62.9 61.2 57.6 53.4 61.9 62.3
71.09 77.24
59.44 Road Grade: 1.0%
feet
Wednesday, May 29, 2024
96 1800
FHWA-RD-77-108 HIGHWAY NOISE PREDICTION MODEL (CALVENO) - v10/31/19
SITE SPECIFIC INPUT DATA
Project Name: Esperanza Specific Plan
Job Number: 15662
Lot No: BLDG 27 Analyst: B. Maddux
Road Name: Amherst Ave
Scenario: Backyard No Wall
9,500
10%
30.0 NOISE MODEL INPUTS
Average Daily Traffic (Adt):
Peak Hour Percentage:
Peak Hour Volume: 950 vehicles
Centerline Dist. to Barrier:
Centerline Dist. to Observer: 40.0
Highway Data
feet
feet
vehicles
Road Elevation: 0.0
Barrier Elevation: 0.0
Pad Elevation: 0.0
Site Data
Site Conditions (Hard = 10, Soft = 15)
Medium Trucks (2 Axles): 15
Heavy Trucks (3+ Axles): 15
Autos: 15
Vehicle Mix
feet
feet Lane Equivalent Distance (in feet)
Barrier Height: 0.0
Observer Height (Above Pad): 5.0 feet
feet
Vehicle Speed: 25 mph
Near/Far Lane Distance: 12 feet
REMEL Traffic Flow Distance
0.38 VehicleType Day Evening Night Daily
Medium Trucks:
Heavy Trucks:
Autos: 77.5% 12.9% 9.6% 97.42%
84.8% 4.9% 10.3% 1.84%
86.5% 2.7% 10.8% 0.74%
2.44 Finite Road
-1.20
Barrier Atten
FHWA Noise Model Calculations
Barrier Distance to Observer: 10.0 feet
Barrier Type (0-Wall, 1-Berm): 0.0
0.000 0.000
Fresnel Berm Atten
Medium Trucks:
Heavy Trucks:
Autos:
VehicleType
-16.86 2.49 -1.20 0.000 0.000
-20.82 2.49 -1.20 0.000 0.000
-0.80
-1.16
-2.30
Medium Trucks:
Heavy Trucks:
Autos:
Noise Source Elevations (in feet)
Medium Trucks:
Heavy Trucks:
Autos: 0.00
2.30 8.01
33.838
33.575
33.601
Grade Adjustment: 0.0
Unmitigated Noise Levels (without Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
61.1 59.2 57.4 51.3 60.0 60.6
55.5 57.7
54.0 47.6 46.1 54.6 54.8
56.3 47.3 48.5 56.9 57.0
Vehicle Noise: 63.5 61.8 58.2 53.9 62.5 62.9
Mitigated Noise Levels (with Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
61.1 59.2 57.4 51.3 60.0 60.6
55.5 57.7
54.0 47.6 46.1 54.6 54.8
56.3 47.3 48.5 56.9 57.0
Vehicle Noise: 63.5 61.8 58.2 53.9 62.5 62.9
71.09 77.24
59.44 Road Grade: 1.0%
feet
Wednesday, May 29, 2024
97 1801
FHWA-RD-77-108 HIGHWAY NOISE PREDICTION MODEL (CALVENO) - v10/31/19
SITE SPECIFIC INPUT DATA
Project Name: Esperanza Specific Plan
Job Number: 15662
Lot No: BLDG 26-22 Analyst: B. Maddux
Road Name: Amherst Ave
Scenario: Backyard No Wall
9,500
10%
30.0 NOISE MODEL INPUTS
Average Daily Traffic (Adt):
Peak Hour Percentage:
Peak Hour Volume: 950 vehicles
Centerline Dist. to Barrier:
Centerline Dist. to Observer: 40.0
Highway Data
feet
feet
vehicles
Road Elevation: 0.0
Barrier Elevation: 0.0
Pad Elevation: 0.0
Site Data
Site Conditions (Hard = 10, Soft = 15)
Medium Trucks (2 Axles): 15
Heavy Trucks (3+ Axles): 15
Autos: 15
Vehicle Mix
feet
feet Lane Equivalent Distance (in feet)
Barrier Height: 0.0
Observer Height (Above Pad): 5.0 feet
feet
Vehicle Speed: 25 mph
Near/Far Lane Distance: 12 feet
REMEL Traffic Flow Distance
0.38 VehicleType Day Evening Night Daily
Medium Trucks:
Heavy Trucks:
Autos: 77.5% 12.9% 9.6% 97.42%
84.8% 4.9% 10.3% 1.84%
86.5% 2.7% 10.8% 0.74%
2.44 Finite Road
-1.20
Barrier Atten
FHWA Noise Model Calculations
Barrier Distance to Observer: 10.0 feet
Barrier Type (0-Wall, 1-Berm): 0.0
0.000 0.000
Fresnel Berm Atten
Medium Trucks:
Heavy Trucks:
Autos:
VehicleType
-16.86 2.49 -1.20 0.000 0.000
-20.82 2.49 -1.20 0.000 0.000
-0.80
-1.16
-2.30
Medium Trucks:
Heavy Trucks:
Autos:
Noise Source Elevations (in feet)
Medium Trucks:
Heavy Trucks:
Autos: 0.00
2.30 8.01
33.838
33.575
33.601
Grade Adjustment: 0.0
Unmitigated Noise Levels (without Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
61.1 59.2 57.4 51.3 60.0 60.6
55.5 57.7
54.0 47.6 46.1 54.6 54.8
56.3 47.3 48.5 56.9 57.0
Vehicle Noise: 63.5 61.8 58.2 53.9 62.5 62.9
Mitigated Noise Levels (with Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
61.1 59.2 57.4 51.3 60.0 60.6
55.5 57.7
54.0 47.6 46.1 54.6 54.8
56.3 47.3 48.5 56.9 57.0
Vehicle Noise: 63.5 61.8 58.2 53.9 62.5 62.9
71.09 77.24
59.44 Road Grade: 0.0%
feet
Wednesday, May 29, 2024
98 1802
FHWA-RD-77-108 HIGHWAY NOISE PREDICTION MODEL (CALVENO) - v10/31/19
SITE SPECIFIC INPUT DATA
Project Name: Esperanza Specific Plan
Job Number: 15662
Lot No: BLDG 20-21 Analyst: B. Maddux
Road Name: Amherst Ave
Scenario: Backyard No Wall
9,500
10%
30.0 NOISE MODEL INPUTS
Average Daily Traffic (Adt):
Peak Hour Percentage:
Peak Hour Volume: 950 vehicles
Centerline Dist. to Barrier:
Centerline Dist. to Observer: 40.0
Highway Data
feet
feet
vehicles
Road Elevation: 0.0
Barrier Elevation: 0.0
Pad Elevation: 0.0
Site Data
Site Conditions (Hard = 10, Soft = 15)
Medium Trucks (2 Axles): 15
Heavy Trucks (3+ Axles): 15
Autos: 15
Vehicle Mix
feet
feet Lane Equivalent Distance (in feet)
Barrier Height: 0.0
Observer Height (Above Pad): 5.0 feet
feet
Vehicle Speed: 25 mph
Near/Far Lane Distance: 12 feet
REMEL Traffic Flow Distance
0.38 VehicleType Day Evening Night Daily
Medium Trucks:
Heavy Trucks:
Autos: 77.5% 12.9% 9.6% 97.42%
84.8% 4.9% 10.3% 1.84%
86.5% 2.7% 10.8% 0.74%
2.44 Finite Road
-1.20
Barrier Atten
FHWA Noise Model Calculations
Barrier Distance to Observer: 10.0 feet
Barrier Type (0-Wall, 1-Berm): 0.0
0.000 0.000
Fresnel Berm Atten
Medium Trucks:
Heavy Trucks:
Autos:
VehicleType
-16.86 2.49 -1.20 0.000 0.000
-20.82 2.49 -1.20 0.000 0.000
-0.80
-1.16
-2.30
Medium Trucks:
Heavy Trucks:
Autos:
Noise Source Elevations (in feet)
Medium Trucks:
Heavy Trucks:
Autos: 0.00
2.30 8.01
33.838
33.575
33.601
Grade Adjustment: 0.0
Unmitigated Noise Levels (without Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
61.1 59.2 57.4 51.3 60.0 60.6
55.5 57.7
54.0 47.6 46.1 54.6 54.8
56.3 47.3 48.5 56.9 57.0
Vehicle Noise: 63.5 61.8 58.2 53.9 62.5 62.9
Mitigated Noise Levels (with Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
61.1 59.2 57.4 51.3 60.0 60.6
55.5 57.7
54.0 47.6 46.1 54.6 54.8
56.3 47.3 48.5 56.9 57.0
Vehicle Noise: 63.5 61.8 58.2 53.9 62.5 62.9
71.09 77.24
59.44 Road Grade: 0.0%
feet
Wednesday, May 29, 2024
99 1803
FHWA-RD-77-108 HIGHWAY NOISE PREDICTION MODEL (CALVENO) - v10/31/19
SITE SPECIFIC INPUT DATA
Project Name: Esperanza Specific Plan
Job Number: 15662
Lot No: BLDG 20 Analyst: B. Maddux
Road Name: Eucalyptus Ave
Scenario: Backyard With Wall
21,700
10%
83.0 NOISE MODEL INPUTS
Average Daily Traffic (Adt):
Peak Hour Percentage:
Peak Hour Volume: 2,170 vehicles
Centerline Dist. to Barrier:
Centerline Dist. to Observer: 105.0
Highway Data
feet
feet
vehicles
Road Elevation: 0.0
Barrier Elevation: 0.0
Pad Elevation: 0.0
Site Data
Site Conditions (Hard = 10, Soft = 15)
Medium Trucks (2 Axles): 15
Heavy Trucks (3+ Axles): 15
Autos: 15
Vehicle Mix
feet
feet Lane Equivalent Distance (in feet)
Barrier Height: 6.0
Observer Height (Above Pad): 5.0 feet
feet
Vehicle Speed: 40 mph
Near/Far Lane Distance: 40 feet
REMEL Traffic Flow Distance
1.93 VehicleType Day Evening Night Daily
Medium Trucks:
Heavy Trucks:
Autos: 77.5% 12.9% 9.6% 97.42%
84.8% 4.9% 10.3% 1.84%
86.5% 2.7% 10.8% 0.74%
-3.33
Finite Road
-1.20
Barrier Atten
FHWA Noise Model Calculations
Barrier Distance to Observer: 22.0 feet
Barrier Type (0-Wall, 1-Berm): 0.0
-6.480 -9.480
Fresnel Berm Atten
Medium Trucks:
Heavy Trucks:
Autos:
VehicleType
-15.31 -3.32 -1.20 -5.900 -8.900
-19.27 -3.31 -1.20 -4.900 -7.900
0.16 0.09
0.00 Medium Trucks:
Heavy Trucks:
Autos:
Noise Source Elevations (in feet)
Medium Trucks:
Heavy Trucks:
Autos: 0.00
2.30 8.01
82.064
81.878
81.797
Grade Adjustment: 0.0
Unmitigated Noise Levels (without Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
64.8 62.9 61.1 55.0 63.7 64.3
56.5 57.4
55.0 48.6 47.1 55.5 55.8
56.0 46.9 48.2 56.5 56.7
Vehicle Noise: 66.0 64.2 61.5 56.4 65.0 65.5
Mitigated Noise Levels (with Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
58.3 56.4 54.6 48.6 57.2 57.8
50.6 52.5
49.1 42.7 41.2 49.6 49.9
51.1 42.0 43.3 51.6 51.8
Vehicle Noise: 59.8 58.1 55.1 50.3 58.8 59.3
76.31 81.16
67.36 Road Grade: 1.0%
feet
Wednesday, May 29, 2024
100
1804
FHWA-RD-77-108 HIGHWAY NOISE PREDICTION MODEL (CALVENO) - v10/31/19
SITE SPECIFIC INPUT DATA
Project Name: Esperanza Specific Plan
Job Number: 15662
Lot No: BLDG 7-14 Analyst: B. Maddux
Road Name: Eucalyptus Ave
Scenario: Backyard With Wall
21,700
10%
83.0 NOISE MODEL INPUTS
Average Daily Traffic (Adt):
Peak Hour Percentage:
Peak Hour Volume: 2,170 vehicles
Centerline Dist. to Barrier:
Centerline Dist. to Observer: 103.0
Highway Data
feet
feet
vehicles
Road Elevation: 0.0
Barrier Elevation: 0.0
Pad Elevation: 0.0
Site Data
Site Conditions (Hard = 10, Soft = 15)
Medium Trucks (2 Axles): 15
Heavy Trucks (3+ Axles): 15
Autos: 15
Vehicle Mix
feet
feet Lane Equivalent Distance (in feet)
Barrier Height: 6.0
Observer Height (Above Pad): 5.0 feet
feet
Vehicle Speed: 40 mph
Near/Far Lane Distance: 40 feet
REMEL Traffic Flow Distance
1.93 VehicleType Day Evening Night Daily
Medium Trucks:
Heavy Trucks:
Autos: 77.5% 12.9% 9.6% 97.42%
84.8% 4.9% 10.3% 1.84%
86.5% 2.7% 10.8% 0.74%
-3.17
Finite Road
-1.20
Barrier Atten
FHWA Noise Model Calculations
Barrier Distance to Observer: 20.0 feet
Barrier Type (0-Wall, 1-Berm): 0.0
-6.480 -9.480
Fresnel Berm Atten
Medium Trucks:
Heavy Trucks:
Autos:
VehicleType
-15.31 -3.16 -1.20 -5.900 -8.900
-19.27 -3.15 -1.20 -4.900 -7.900
0.16 0.09
0.00 Medium Trucks:
Heavy Trucks:
Autos:
Noise Source Elevations (in feet)
Medium Trucks:
Heavy Trucks:
Autos: 0.00
2.30 8.01
80.067
79.881
79.800
Grade Adjustment: 0.0
Unmitigated Noise Levels (without Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
64.9 63.0 61.2 55.2 63.8 64.4
56.6 57.5
55.1 48.8 47.2 55.7 55.9
56.1 47.1 48.3 56.7 56.8
Vehicle Noise: 66.2 64.4 61.6 56.5 65.1 65.6
Mitigated Noise Levels (with Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
58.4 56.5 54.8 48.7 57.3 57.9
50.7 52.6
49.2 42.9 41.3 49.8 50.0
51.2 42.2 43.4 51.8 51.9
Vehicle Noise: 60.0 58.2 55.3 50.4 59.0 59.4
76.31 81.16
67.36 Road Grade: 1.0%
feet
Wednesday, May 29, 2024
101
1805
FHWA-RD-77-108 HIGHWAY NOISE PREDICTION MODEL (CALVENO) - v10/31/19
SITE SPECIFIC INPUT DATA
Project Name: Esperanza Specific Plan
Job Number: 15662
Lot No: BLDG 6 Analyst: B. Maddux
Road Name: Eucalyptus Ave
Scenario: Backyard With Wall
21,700
10%
84.0 NOISE MODEL INPUTS
Average Daily Traffic (Adt):
Peak Hour Percentage:
Peak Hour Volume: 2,170 vehicles
Centerline Dist. to Barrier:
Centerline Dist. to Observer: 104.0
Highway Data
feet
feet
vehicles
Road Elevation: 0.0
Barrier Elevation: 0.0
Pad Elevation: 0.0
Site Data
Site Conditions (Hard = 10, Soft = 15)
Medium Trucks (2 Axles): 15
Heavy Trucks (3+ Axles): 15
Autos: 15
Vehicle Mix
feet
feet Lane Equivalent Distance (in feet)
Barrier Height: 6.0
Observer Height (Above Pad): 5.0 feet
feet
Vehicle Speed: 40 mph
Near/Far Lane Distance: 40 feet
REMEL Traffic Flow Distance
1.93 VehicleType Day Evening Night Daily
Medium Trucks:
Heavy Trucks:
Autos: 77.5% 12.9% 9.6% 97.42%
84.8% 4.9% 10.3% 1.84%
86.5% 2.7% 10.8% 0.74%
-3.26
Finite Road
-1.20
Barrier Atten
FHWA Noise Model Calculations
Barrier Distance to Observer: 20.0 feet
Barrier Type (0-Wall, 1-Berm): 0.0
-6.400 -9.400
Fresnel Berm Atten
Medium Trucks:
Heavy Trucks:
Autos:
VehicleType
-15.31 -3.24 -1.20 -5.900 -8.900
-19.27 -3.23 -1.20 -4.900 -7.900
0.15 0.09
0.00 Medium Trucks:
Heavy Trucks:
Autos:
Noise Source Elevations (in feet)
Medium Trucks:
Heavy Trucks:
Autos: 0.00
2.30 8.01
81.115
80.932
80.853
Grade Adjustment: 0.0
Unmitigated Noise Levels (without Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
64.8 62.9 61.2 55.1 63.7 64.3
56.6 57.5
55.1 48.7 47.1 55.6 55.8
56.0 47.0 48.2 56.6 56.7
Vehicle Noise: 66.1 64.3 61.6 56.5 65.0 65.5
Mitigated Noise Levels (with Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
58.4 56.5 54.8 48.7 57.3 57.9
50.7 52.6
49.2 42.8 41.2 49.7 49.9
51.1 42.1 43.3 51.7 51.8
Vehicle Noise: 60.0 58.2 55.2 50.4 58.9 59.4
76.31 81.16
67.36 Road Grade: 1.0%
feet
Wednesday, May 29, 2024
102
1806
FHWA-RD-77-108 HIGHWAY NOISE PREDICTION MODEL (CALVENO) - v10/31/19
SITE SPECIFIC INPUT DATA
Project Name: Esperanza Specific Plan
Job Number: 15662
Lot No: BLDG 5-6 Analyst: B. Maddux
Road Name: Clifton Ave
Scenario: Backyard With Wall
9,500
10%
31.0 NOISE MODEL INPUTS
Average Daily Traffic (Adt):
Peak Hour Percentage:
Peak Hour Volume: 950 vehicles
Centerline Dist. to Barrier:
Centerline Dist. to Observer: 41.0
Highway Data
feet
feet
vehicles
Road Elevation: 0.0
Barrier Elevation: 0.0
Pad Elevation: 0.0
Site Data
Site Conditions (Hard = 10, Soft = 15)
Medium Trucks (2 Axles): 15
Heavy Trucks (3+ Axles): 15
Autos: 15
Vehicle Mix
feet
feet Lane Equivalent Distance (in feet)
Barrier Height: 0.0
Observer Height (Above Pad): 5.0 feet
feet
Vehicle Speed: 25 mph
Near/Far Lane Distance: 12 feet
REMEL Traffic Flow Distance
0.38 VehicleType Day Evening Night Daily
Medium Trucks:
Heavy Trucks:
Autos: 77.5% 12.9% 9.6% 97.42%
84.8% 4.9% 10.3% 1.84%
86.5% 2.7% 10.8% 0.74%
2.25 Finite Road
-1.20
Barrier Atten
FHWA Noise Model Calculations
Barrier Distance to Observer: 10.0 feet
Barrier Type (0-Wall, 1-Berm): 0.0
0.000 0.000
Fresnel Berm Atten
Medium Trucks:
Heavy Trucks:
Autos:
VehicleType
-16.86 2.30 -1.20 0.000 0.000
-20.82 2.29 -1.20 0.000 0.000
-0.81
-1.16
-2.25
Medium Trucks:
Heavy Trucks:
Autos:
Noise Source Elevations (in feet)
Medium Trucks:
Heavy Trucks:
Autos: 0.00
2.30 8.01
34.843
34.588
34.613
Grade Adjustment: 0.0
Unmitigated Noise Levels (without Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
60.9 59.0 57.2 51.1 59.8 60.4
55.3 57.5
53.8 47.5 45.9 54.4 54.6
56.1 47.1 48.3 56.7 56.8
Vehicle Noise: 63.3 61.6 58.0 53.7 62.3 62.7
Mitigated Noise Levels (with Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
60.9 59.0 57.2 51.1 59.8 60.4
55.3 57.5
53.8 47.5 45.9 54.4 54.6
56.1 47.1 48.3 56.7 56.8
Vehicle Noise: 63.3 61.6 58.0 53.7 62.3 62.7
71.09 77.24
59.44 Road Grade: 1.0%
feet
Wednesday, May 29, 2024
103
1807
FHWA-RD-77-108 HIGHWAY NOISE PREDICTION MODEL (CALVENO) - v10/31/19
SITE SPECIFIC INPUT DATA
Project Name: Esperanza Specific Plan
Job Number: 15662
Lot No: BLDG 4 Analyst: B. Maddux
Road Name: Clifton Ave
Scenario: Backyard With Wall
9,500
10%
32.0 NOISE MODEL INPUTS
Average Daily Traffic (Adt):
Peak Hour Percentage:
Peak Hour Volume: 950 vehicles
Centerline Dist. to Barrier:
Centerline Dist. to Observer: 51.0
Highway Data
feet
feet
vehicles
Road Elevation: 0.0
Barrier Elevation: 0.0
Pad Elevation: 0.0
Site Data
Site Conditions (Hard = 10, Soft = 15)
Medium Trucks (2 Axles): 15
Heavy Trucks (3+ Axles): 15
Autos: 15
Vehicle Mix
feet
feet Lane Equivalent Distance (in feet)
Barrier Height: 0.0
Observer Height (Above Pad): 5.0 feet
feet
Vehicle Speed: 25 mph
Near/Far Lane Distance: 12 feet
REMEL Traffic Flow Distance
0.38 VehicleType Day Evening Night Daily
Medium Trucks:
Heavy Trucks:
Autos: 77.5% 12.9% 9.6% 97.42%
84.8% 4.9% 10.3% 1.84%
86.5% 2.7% 10.8% 0.74%
0.60 Finite Road
-1.20
Barrier Atten
FHWA Noise Model Calculations
Barrier Distance to Observer: 19.0 feet
Barrier Type (0-Wall, 1-Berm): 0.0
0.000 0.000
Fresnel Berm Atten
Medium Trucks:
Heavy Trucks:
Autos:
VehicleType
-16.86 0.63 -1.20 0.000 0.000
-20.82 0.63 -1.20 0.000 0.000
-0.36
-0.65
-1.71
Medium Trucks:
Heavy Trucks:
Autos:
Noise Source Elevations (in feet)
Medium Trucks:
Heavy Trucks:
Autos: 0.00
2.30 8.01
44.878
44.680
44.699
Grade Adjustment: 0.0
Unmitigated Noise Levels (without Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
59.2 57.3 55.6 49.5 58.1 58.7
53.7 55.9
52.1 45.8 44.2 52.7 52.9
54.4 45.4 46.6 55.0 55.1
Vehicle Noise: 61.6 59.9 56.4 52.1 60.6 61.0
Mitigated Noise Levels (with Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
59.2 57.3 55.6 49.5 58.1 58.7
53.7 55.9
52.1 45.8 44.2 52.7 52.9
54.4 45.4 46.6 55.0 55.1
Vehicle Noise: 61.6 59.9 56.4 52.1 60.6 61.0
71.09 77.24
59.44 Road Grade: 1.0%
feet
Wednesday, May 29, 2024
104
1808
FHWA-RD-77-108 HIGHWAY NOISE PREDICTION MODEL (CALVENO) - v10/31/19
SITE SPECIFIC INPUT DATA
Project Name: Esperanza Specific Plan
Job Number: 15662
Lot No: BLDG 4 Analyst: B. Maddux
Road Name: Chatham St
Scenario: Backyard With Wall
9,500
10%
25.0 NOISE MODEL INPUTS
Average Daily Traffic (Adt):
Peak Hour Percentage:
Peak Hour Volume: 950 vehicles
Centerline Dist. to Barrier:
Centerline Dist. to Observer: 33.0
Highway Data
feet
feet
vehicles
Road Elevation: 0.0
Barrier Elevation: 0.0
Pad Elevation: 0.0
Site Data
Site Conditions (Hard = 10, Soft = 15)
Medium Trucks (2 Axles): 15
Heavy Trucks (3+ Axles): 15
Autos: 15
Vehicle Mix
feet
feet Lane Equivalent Distance (in feet)
Barrier Height: 0.0
Observer Height (Above Pad): 5.0 feet
feet
Vehicle Speed: 25 mph
Near/Far Lane Distance: 12 feet
REMEL Traffic Flow Distance
0.38 VehicleType Day Evening Night Daily
Medium Trucks:
Heavy Trucks:
Autos: 77.5% 12.9% 9.6% 97.42%
84.8% 4.9% 10.3% 1.84%
86.5% 2.7% 10.8% 0.74%
3.96 Finite Road
-1.20
Barrier Atten
FHWA Noise Model Calculations
Barrier Distance to Observer: 8.0 feet
Barrier Type (0-Wall, 1-Berm): 0.0
0.000 0.000
Fresnel Berm Atten
Medium Trucks:
Heavy Trucks:
Autos:
VehicleType
-16.86 4.04 -1.20 0.000 0.000
-20.82 4.03 -1.20 0.000 0.000
-0.95
-1.41
-2.82
Medium Trucks:
Heavy Trucks:
Autos:
Noise Source Elevations (in feet)
Medium Trucks:
Heavy Trucks:
Autos: 0.00
2.30 8.01
26.796
26.463
26.496
Grade Adjustment: 0.0
Unmitigated Noise Levels (without Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
62.6 60.7 58.9 52.9 61.5 62.1
57.1 59.3
55.6 49.2 47.7 56.1 56.3
57.8 48.8 50.1 58.4 58.5
Vehicle Noise: 65.0 63.3 59.7 55.5 64.0 64.4
Mitigated Noise Levels (with Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
62.6 60.7 58.9 52.9 61.5 62.1
57.1 59.3
55.6 49.2 47.7 56.1 56.3
57.8 48.8 50.1 58.4 58.5
Vehicle Noise: 65.0 63.3 59.7 55.5 64.0 64.4
71.09 77.24
59.44 Road Grade: 1.0%
feet
Wednesday, May 29, 2024
105
1809
FHWA-RD-77-108 HIGHWAY NOISE PREDICTION MODEL (CALVENO) - v10/31/19
SITE SPECIFIC INPUT DATA
Project Name: Esperanza Specific Plan
Job Number: 15662
Lot No: BLDG 1-3 Analyst: B. Maddux
Road Name: Chatham St
Scenario: Backyard With Wall
9,500
10%
25.0 NOISE MODEL INPUTS
Average Daily Traffic (Adt):
Peak Hour Percentage:
Peak Hour Volume: 950 vehicles
Centerline Dist. to Barrier:
Centerline Dist. to Observer: 35.0
Highway Data
feet
feet
vehicles
Road Elevation: 0.0
Barrier Elevation: 0.0
Pad Elevation: 0.0
Site Data
Site Conditions (Hard = 10, Soft = 15)
Medium Trucks (2 Axles): 15
Heavy Trucks (3+ Axles): 15
Autos: 15
Vehicle Mix
feet
feet Lane Equivalent Distance (in feet)
Barrier Height: 0.0
Observer Height (Above Pad): 5.0 feet
feet
Vehicle Speed: 25 mph
Near/Far Lane Distance: 12 feet
REMEL Traffic Flow Distance
0.38 VehicleType Day Evening Night Daily
Medium Trucks:
Heavy Trucks:
Autos: 77.5% 12.9% 9.6% 97.42%
84.8% 4.9% 10.3% 1.84%
86.5% 2.7% 10.8% 0.74%
3.49 Finite Road
-1.20
Barrier Atten
FHWA Noise Model Calculations
Barrier Distance to Observer: 10.0 feet
Barrier Type (0-Wall, 1-Berm): 0.0
0.000 0.000
Fresnel Berm Atten
Medium Trucks:
Heavy Trucks:
Autos:
VehicleType
-16.86 3.56 -1.20 0.000 0.000
-20.82 3.55 -1.20 0.000 0.000
-0.74
-1.17
-2.59
Medium Trucks:
Heavy Trucks:
Autos:
Noise Source Elevations (in feet)
Medium Trucks:
Heavy Trucks:
Autos: 0.00
2.30 8.01
28.810
28.501
28.531
Grade Adjustment: 0.0
Unmitigated Noise Levels (without Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
62.1 60.2 58.4 52.4 61.0 61.6
56.6 58.8
55.1 48.7 47.2 55.6 55.9
57.4 48.3 49.6 57.9 58.1
Vehicle Noise: 64.5 62.8 59.2 55.0 63.5 63.9
Mitigated Noise Levels (with Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
62.1 60.2 58.4 52.4 61.0 61.6
56.6 58.8
55.1 48.7 47.2 55.6 55.9
57.4 48.3 49.6 57.9 58.1
Vehicle Noise: 64.5 62.8 59.2 55.0 63.5 63.9
71.09 77.24
59.44 Road Grade: 1.0%
feet
Wednesday, May 29, 2024
106
1810
FHWA-RD-77-108 HIGHWAY NOISE PREDICTION MODEL (CALVENO) - v10/31/19
SITE SPECIFIC INPUT DATA
Project Name: Esperanza Specific Plan
Job Number: 15662
Lot No: BLDG 27-28 Analyst: B. Maddux
Road Name: Chatham St
Scenario: Backyard With Wall
9,500
10%
25.0 NOISE MODEL INPUTS
Average Daily Traffic (Adt):
Peak Hour Percentage:
Peak Hour Volume: 950 vehicles
Centerline Dist. to Barrier:
Centerline Dist. to Observer: 43.0
Highway Data
feet
feet
vehicles
Road Elevation: 0.0
Barrier Elevation: 0.0
Pad Elevation: 0.0
Site Data
Site Conditions (Hard = 10, Soft = 15)
Medium Trucks (2 Axles): 15
Heavy Trucks (3+ Axles): 15
Autos: 15
Vehicle Mix
feet
feet Lane Equivalent Distance (in feet)
Barrier Height: 0.0
Observer Height (Above Pad): 5.0 feet
feet
Vehicle Speed: 25 mph
Near/Far Lane Distance: 12 feet
REMEL Traffic Flow Distance
0.38 VehicleType Day Evening Night Daily
Medium Trucks:
Heavy Trucks:
Autos: 77.5% 12.9% 9.6% 97.42%
84.8% 4.9% 10.3% 1.84%
86.5% 2.7% 10.8% 0.74%
1.88 Finite Road
-1.20
Barrier Atten
FHWA Noise Model Calculations
Barrier Distance to Observer: 18.0 feet
Barrier Type (0-Wall, 1-Berm): 0.0
0.000 0.000
Fresnel Berm Atten
Medium Trucks:
Heavy Trucks:
Autos:
VehicleType
-16.86 1.93 -1.20 0.000 0.000
-20.82 1.92 -1.20 0.000 0.000
-0.34
-0.71
-2.13
Medium Trucks:
Heavy Trucks:
Autos:
Noise Source Elevations (in feet)
Medium Trucks:
Heavy Trucks:
Autos: 0.00
2.30 8.01
36.851
36.610
36.634
Grade Adjustment: 0.0
Unmitigated Noise Levels (without Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
60.5 58.6 56.8 50.8 59.4 60.0
55.0 57.1
53.4 47.1 45.5 54.0 54.2
55.7 46.7 47.9 56.3 56.4
Vehicle Noise: 62.9 61.2 57.6 53.4 61.9 62.3
Mitigated Noise Levels (with Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
60.5 58.6 56.8 50.8 59.4 60.0
55.0 57.1
53.4 47.1 45.5 54.0 54.2
55.7 46.7 47.9 56.3 56.4
Vehicle Noise: 62.9 61.2 57.6 53.4 61.9 62.3
71.09 77.24
59.44 Road Grade: 1.0%
feet
Wednesday, May 29, 2024
107
1811
FHWA-RD-77-108 HIGHWAY NOISE PREDICTION MODEL (CALVENO) - v10/31/19
SITE SPECIFIC INPUT DATA
Project Name: Esperanza Specific Plan
Job Number: 15662
Lot No: BLDG 27 Analyst: B. Maddux
Road Name: Amherst Ave
Scenario: Backyard With Wall
9,500
10%
30.0 NOISE MODEL INPUTS
Average Daily Traffic (Adt):
Peak Hour Percentage:
Peak Hour Volume: 950 vehicles
Centerline Dist. to Barrier:
Centerline Dist. to Observer: 40.0
Highway Data
feet
feet
vehicles
Road Elevation: 0.0
Barrier Elevation: 0.0
Pad Elevation: 0.0
Site Data
Site Conditions (Hard = 10, Soft = 15)
Medium Trucks (2 Axles): 15
Heavy Trucks (3+ Axles): 15
Autos: 15
Vehicle Mix
feet
feet Lane Equivalent Distance (in feet)
Barrier Height: 0.0
Observer Height (Above Pad): 5.0 feet
feet
Vehicle Speed: 25 mph
Near/Far Lane Distance: 12 feet
REMEL Traffic Flow Distance
0.38 VehicleType Day Evening Night Daily
Medium Trucks:
Heavy Trucks:
Autos: 77.5% 12.9% 9.6% 97.42%
84.8% 4.9% 10.3% 1.84%
86.5% 2.7% 10.8% 0.74%
2.44 Finite Road
-1.20
Barrier Atten
FHWA Noise Model Calculations
Barrier Distance to Observer: 10.0 feet
Barrier Type (0-Wall, 1-Berm): 0.0
0.000 0.000
Fresnel Berm Atten
Medium Trucks:
Heavy Trucks:
Autos:
VehicleType
-16.86 2.49 -1.20 0.000 0.000
-20.82 2.49 -1.20 0.000 0.000
-0.80
-1.16
-2.30
Medium Trucks:
Heavy Trucks:
Autos:
Noise Source Elevations (in feet)
Medium Trucks:
Heavy Trucks:
Autos: 0.00
2.30 8.01
33.838
33.575
33.601
Grade Adjustment: 0.0
Unmitigated Noise Levels (without Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
61.1 59.2 57.4 51.3 60.0 60.6
55.5 57.7
54.0 47.6 46.1 54.6 54.8
56.3 47.3 48.5 56.9 57.0
Vehicle Noise: 63.5 61.8 58.2 53.9 62.5 62.9
Mitigated Noise Levels (with Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
61.1 59.2 57.4 51.3 60.0 60.6
55.5 57.7
54.0 47.6 46.1 54.6 54.8
56.3 47.3 48.5 56.9 57.0
Vehicle Noise: 63.5 61.8 58.2 53.9 62.5 62.9
71.09 77.24
59.44 Road Grade: 1.0%
feet
Wednesday, May 29, 2024
108
1812
FHWA-RD-77-108 HIGHWAY NOISE PREDICTION MODEL (CALVENO) - v10/31/19
SITE SPECIFIC INPUT DATA
Project Name: Esperanza Specific Plan
Job Number: 15662
Lot No: BLDG 26-22 Analyst: B. Maddux
Road Name: Amherst Ave
Scenario: Backyard With Wall
9,500
10%
30.0 NOISE MODEL INPUTS
Average Daily Traffic (Adt):
Peak Hour Percentage:
Peak Hour Volume: 950 vehicles
Centerline Dist. to Barrier:
Centerline Dist. to Observer: 40.0
Highway Data
feet
feet
vehicles
Road Elevation: 0.0
Barrier Elevation: 0.0
Pad Elevation: 0.0
Site Data
Site Conditions (Hard = 10, Soft = 15)
Medium Trucks (2 Axles): 15
Heavy Trucks (3+ Axles): 15
Autos: 15
Vehicle Mix
feet
feet Lane Equivalent Distance (in feet)
Barrier Height: 0.0
Observer Height (Above Pad): 5.0 feet
feet
Vehicle Speed: 25 mph
Near/Far Lane Distance: 12 feet
REMEL Traffic Flow Distance
0.38 VehicleType Day Evening Night Daily
Medium Trucks:
Heavy Trucks:
Autos: 77.5% 12.9% 9.6% 97.42%
84.8% 4.9% 10.3% 1.84%
86.5% 2.7% 10.8% 0.74%
2.44 Finite Road
-1.20
Barrier Atten
FHWA Noise Model Calculations
Barrier Distance to Observer: 10.0 feet
Barrier Type (0-Wall, 1-Berm): 0.0
0.000 0.000
Fresnel Berm Atten
Medium Trucks:
Heavy Trucks:
Autos:
VehicleType
-16.86 2.49 -1.20 0.000 0.000
-20.82 2.49 -1.20 0.000 0.000
-0.80
-1.16
-2.30
Medium Trucks:
Heavy Trucks:
Autos:
Noise Source Elevations (in feet)
Medium Trucks:
Heavy Trucks:
Autos: 0.00
2.30 8.01
33.838
33.575
33.601
Grade Adjustment: 0.0
Unmitigated Noise Levels (without Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
61.1 59.2 57.4 51.3 60.0 60.6
55.5 57.7
54.0 47.6 46.1 54.6 54.8
56.3 47.3 48.5 56.9 57.0
Vehicle Noise: 63.5 61.8 58.2 53.9 62.5 62.9
Mitigated Noise Levels (with Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
61.1 59.2 57.4 51.3 60.0 60.6
55.5 57.7
54.0 47.6 46.1 54.6 54.8
56.3 47.3 48.5 56.9 57.0
Vehicle Noise: 63.5 61.8 58.2 53.9 62.5 62.9
71.09 77.24
59.44 Road Grade: 0.0%
feet
Wednesday, May 29, 2024
109
1813
FHWA-RD-77-108 HIGHWAY NOISE PREDICTION MODEL (CALVENO) - v10/31/19
SITE SPECIFIC INPUT DATA
Project Name: Esperanza Specific Plan
Job Number: 15662
Lot No: BLDG 20-21 Analyst: B. Maddux
Road Name: Amherst Ave
Scenario: Backyard With Wall
9,500
10%
30.0 NOISE MODEL INPUTS
Average Daily Traffic (Adt):
Peak Hour Percentage:
Peak Hour Volume: 950 vehicles
Centerline Dist. to Barrier:
Centerline Dist. to Observer: 40.0
Highway Data
feet
feet
vehicles
Road Elevation: 0.0
Barrier Elevation: 0.0
Pad Elevation: 0.0
Site Data
Site Conditions (Hard = 10, Soft = 15)
Medium Trucks (2 Axles): 15
Heavy Trucks (3+ Axles): 15
Autos: 15
Vehicle Mix
feet
feet Lane Equivalent Distance (in feet)
Barrier Height: 0.0
Observer Height (Above Pad): 5.0 feet
feet
Vehicle Speed: 25 mph
Near/Far Lane Distance: 12 feet
REMEL Traffic Flow Distance
0.38 VehicleType Day Evening Night Daily
Medium Trucks:
Heavy Trucks:
Autos: 77.5% 12.9% 9.6% 97.42%
84.8% 4.9% 10.3% 1.84%
86.5% 2.7% 10.8% 0.74%
2.44 Finite Road
-1.20
Barrier Atten
FHWA Noise Model Calculations
Barrier Distance to Observer: 10.0 feet
Barrier Type (0-Wall, 1-Berm): 0.0
0.000 0.000
Fresnel Berm Atten
Medium Trucks:
Heavy Trucks:
Autos:
VehicleType
-16.86 2.49 -1.20 0.000 0.000
-20.82 2.49 -1.20 0.000 0.000
-0.80
-1.16
-2.30
Medium Trucks:
Heavy Trucks:
Autos:
Noise Source Elevations (in feet)
Medium Trucks:
Heavy Trucks:
Autos: 0.00
2.30 8.01
33.838
33.575
33.601
Grade Adjustment: 0.0
Unmitigated Noise Levels (without Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
61.1 59.2 57.4 51.3 60.0 60.6
55.5 57.7
54.0 47.6 46.1 54.6 54.8
56.3 47.3 48.5 56.9 57.0
Vehicle Noise: 63.5 61.8 58.2 53.9 62.5 62.9
Mitigated Noise Levels (with Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
61.1 59.2 57.4 51.3 60.0 60.6
55.5 57.7
54.0 47.6 46.1 54.6 54.8
56.3 47.3 48.5 56.9 57.0
Vehicle Noise: 63.5 61.8 58.2 53.9 62.5 62.9
71.09 77.24
59.44 Road Grade: 0.0%
feet
Wednesday, May 29, 2024
110
1814
FHWA-RD-77-108 HIGHWAY NOISE PREDICTION MODEL (CALVENO) - v10/31/19
SITE SPECIFIC INPUT DATA
Project Name: Esperanza Specific Plan
Job Number: 15662
Lot No: BLDG 20 Analyst: B. Maddux
Road Name: Eucalyptus Ave
Scenario: First Floor With Wall
21,700
10%
83.0 NOISE MODEL INPUTS
Average Daily Traffic (Adt):
Peak Hour Percentage:
Peak Hour Volume: 2,170 vehicles
Centerline Dist. to Barrier:
Centerline Dist. to Observer: 105.0
Highway Data
feet
feet
vehicles
Road Elevation: 0.0
Barrier Elevation: 0.0
Pad Elevation: 0.0
Site Data
Site Conditions (Hard = 10, Soft = 15)
Medium Trucks (2 Axles): 15
Heavy Trucks (3+ Axles): 15
Autos: 15
Vehicle Mix
feet
feet Lane Equivalent Distance (in feet)
Barrier Height: 6.0
Observer Height (Above Pad): 5.0 feet
feet
Vehicle Speed: 40 mph
Near/Far Lane Distance: 40 feet
REMEL Traffic Flow Distance
1.93 VehicleType Day Evening Night Daily
Medium Trucks:
Heavy Trucks:
Autos: 77.5% 12.9% 9.6% 97.42%
84.8% 4.9% 10.3% 1.84%
86.5% 2.7% 10.8% 0.74%
-3.33
Finite Road
-1.20
Barrier Atten
FHWA Noise Model Calculations
Barrier Distance to Observer: 22.0 feet
Barrier Type (0-Wall, 1-Berm): 0.0
-6.480 -9.480
Fresnel Berm Atten
Medium Trucks:
Heavy Trucks:
Autos:
VehicleType
-15.31 -3.32 -1.20 -5.900 -8.900
-19.27 -3.31 -1.20 -4.900 -7.900
0.16 0.09
0.00 Medium Trucks:
Heavy Trucks:
Autos:
Noise Source Elevations (in feet)
Medium Trucks:
Heavy Trucks:
Autos: 0.00
2.30 8.01
82.064
81.878
81.797
Grade Adjustment: 0.0
Unmitigated Noise Levels (without Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
64.8 62.9 61.1 55.0 63.7 64.3
56.5 57.4
55.0 48.6 47.1 55.5 55.8
56.0 46.9 48.2 56.5 56.7
Vehicle Noise: 66.0 64.2 61.5 56.4 65.0 65.5
Mitigated Noise Levels (with Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
58.3 56.4 54.6 48.6 57.2 57.8
50.6 52.5
49.1 42.7 41.2 49.6 49.9
51.1 42.0 43.3 51.6 51.8
Vehicle Noise: 59.8 58.1 55.1 50.3 58.8 59.3
76.31 81.16
67.36 Road Grade: 1.0%
feet
Wednesday, May 29, 2024
111
1815
FHWA-RD-77-108 HIGHWAY NOISE PREDICTION MODEL (CALVENO) - v10/31/19
SITE SPECIFIC INPUT DATA
Project Name: Esperanza Specific Plan
Job Number: 15662
Lot No: BLDG 7-14 Analyst: B. Maddux
Road Name: Eucalyptus Ave
Scenario: First Floor With Wall
21,700
10%
83.0 NOISE MODEL INPUTS
Average Daily Traffic (Adt):
Peak Hour Percentage:
Peak Hour Volume: 2,170 vehicles
Centerline Dist. to Barrier:
Centerline Dist. to Observer: 103.0
Highway Data
feet
feet
vehicles
Road Elevation: 0.0
Barrier Elevation: 0.0
Pad Elevation: 0.0
Site Data
Site Conditions (Hard = 10, Soft = 15)
Medium Trucks (2 Axles): 15
Heavy Trucks (3+ Axles): 15
Autos: 15
Vehicle Mix
feet
feet Lane Equivalent Distance (in feet)
Barrier Height: 6.0
Observer Height (Above Pad): 5.0 feet
feet
Vehicle Speed: 40 mph
Near/Far Lane Distance: 40 feet
REMEL Traffic Flow Distance
1.93 VehicleType Day Evening Night Daily
Medium Trucks:
Heavy Trucks:
Autos: 77.5% 12.9% 9.6% 97.42%
84.8% 4.9% 10.3% 1.84%
86.5% 2.7% 10.8% 0.74%
-3.17
Finite Road
-1.20
Barrier Atten
FHWA Noise Model Calculations
Barrier Distance to Observer: 20.0 feet
Barrier Type (0-Wall, 1-Berm): 0.0
-6.480 -9.480
Fresnel Berm Atten
Medium Trucks:
Heavy Trucks:
Autos:
VehicleType
-15.31 -3.16 -1.20 -5.900 -8.900
-19.27 -3.15 -1.20 -4.900 -7.900
0.16 0.09
0.00 Medium Trucks:
Heavy Trucks:
Autos:
Noise Source Elevations (in feet)
Medium Trucks:
Heavy Trucks:
Autos: 0.00
2.30 8.01
80.067
79.881
79.800
Grade Adjustment: 0.0
Unmitigated Noise Levels (without Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
64.9 63.0 61.2 55.2 63.8 64.4
56.6 57.5
55.1 48.8 47.2 55.7 55.9
56.1 47.1 48.3 56.7 56.8
Vehicle Noise: 66.2 64.4 61.6 56.5 65.1 65.6
Mitigated Noise Levels (with Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
58.4 56.5 54.8 48.7 57.3 57.9
50.7 52.6
49.2 42.9 41.3 49.8 50.0
51.2 42.2 43.4 51.8 51.9
Vehicle Noise: 60.0 58.2 55.3 50.4 59.0 59.4
76.31 81.16
67.36 Road Grade: 1.0%
feet
Wednesday, May 29, 2024
112
1816
FHWA-RD-77-108 HIGHWAY NOISE PREDICTION MODEL (CALVENO) - v10/31/19
SITE SPECIFIC INPUT DATA
Project Name: Esperanza Specific Plan
Job Number: 15662
Lot No: BLDG 6 Analyst: B. Maddux
Road Name: Eucalyptus Ave
Scenario: First Floor With Wall
21,700
10%
84.0 NOISE MODEL INPUTS
Average Daily Traffic (Adt):
Peak Hour Percentage:
Peak Hour Volume: 2,170 vehicles
Centerline Dist. to Barrier:
Centerline Dist. to Observer: 104.0
Highway Data
feet
feet
vehicles
Road Elevation: 0.0
Barrier Elevation: 0.0
Pad Elevation: 0.0
Site Data
Site Conditions (Hard = 10, Soft = 15)
Medium Trucks (2 Axles): 15
Heavy Trucks (3+ Axles): 15
Autos: 15
Vehicle Mix
feet
feet Lane Equivalent Distance (in feet)
Barrier Height: 6.0
Observer Height (Above Pad): 5.0 feet
feet
Vehicle Speed: 40 mph
Near/Far Lane Distance: 40 feet
REMEL Traffic Flow Distance
1.93 VehicleType Day Evening Night Daily
Medium Trucks:
Heavy Trucks:
Autos: 77.5% 12.9% 9.6% 97.42%
84.8% 4.9% 10.3% 1.84%
86.5% 2.7% 10.8% 0.74%
-3.26
Finite Road
-1.20
Barrier Atten
FHWA Noise Model Calculations
Barrier Distance to Observer: 20.0 feet
Barrier Type (0-Wall, 1-Berm): 0.0
-6.400 -9.400
Fresnel Berm Atten
Medium Trucks:
Heavy Trucks:
Autos:
VehicleType
-15.31 -3.24 -1.20 -5.900 -8.900
-19.27 -3.23 -1.20 -4.900 -7.900
0.15 0.09
0.00 Medium Trucks:
Heavy Trucks:
Autos:
Noise Source Elevations (in feet)
Medium Trucks:
Heavy Trucks:
Autos: 0.00
2.30 8.01
81.115
80.932
80.853
Grade Adjustment: 0.0
Unmitigated Noise Levels (without Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
64.8 62.9 61.2 55.1 63.7 64.3
56.6 57.5
55.1 48.7 47.1 55.6 55.8
56.0 47.0 48.2 56.6 56.7
Vehicle Noise: 66.1 64.3 61.6 56.5 65.0 65.5
Mitigated Noise Levels (with Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
58.4 56.5 54.8 48.7 57.3 57.9
50.7 52.6
49.2 42.8 41.2 49.7 49.9
51.1 42.1 43.3 51.7 51.8
Vehicle Noise: 60.0 58.2 55.2 50.4 58.9 59.4
76.31 81.16
67.36 Road Grade: 1.0%
feet
Wednesday, May 29, 2024
113
1817
FHWA-RD-77-108 HIGHWAY NOISE PREDICTION MODEL (CALVENO) - v10/31/19
SITE SPECIFIC INPUT DATA
Project Name: Esperanza Specific Plan
Job Number: 15662
Lot No: BLDG 5-6 Analyst: B. Maddux
Road Name: Clifton Ave
Scenario: First Floor With Wall
9,500
10%
31.0 NOISE MODEL INPUTS
Average Daily Traffic (Adt):
Peak Hour Percentage:
Peak Hour Volume: 950 vehicles
Centerline Dist. to Barrier:
Centerline Dist. to Observer: 41.0
Highway Data
feet
feet
vehicles
Road Elevation: 0.0
Barrier Elevation: 0.0
Pad Elevation: 0.0
Site Data
Site Conditions (Hard = 10, Soft = 15)
Medium Trucks (2 Axles): 15
Heavy Trucks (3+ Axles): 15
Autos: 15
Vehicle Mix
feet
feet Lane Equivalent Distance (in feet)
Barrier Height: 0.0
Observer Height (Above Pad): 5.0 feet
feet
Vehicle Speed: 25 mph
Near/Far Lane Distance: 12 feet
REMEL Traffic Flow Distance
0.38 VehicleType Day Evening Night Daily
Medium Trucks:
Heavy Trucks:
Autos: 77.5% 12.9% 9.6% 97.42%
84.8% 4.9% 10.3% 1.84%
86.5% 2.7% 10.8% 0.74%
2.25 Finite Road
-1.20
Barrier Atten
FHWA Noise Model Calculations
Barrier Distance to Observer: 10.0 feet
Barrier Type (0-Wall, 1-Berm): 0.0
0.000 0.000
Fresnel Berm Atten
Medium Trucks:
Heavy Trucks:
Autos:
VehicleType
-16.86 2.30 -1.20 0.000 0.000
-20.82 2.29 -1.20 0.000 0.000
-0.81
-1.16
-2.25
Medium Trucks:
Heavy Trucks:
Autos:
Noise Source Elevations (in feet)
Medium Trucks:
Heavy Trucks:
Autos: 0.00
2.30 8.01
34.843
34.588
34.613
Grade Adjustment: 0.0
Unmitigated Noise Levels (without Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
60.9 59.0 57.2 51.1 59.8 60.4
55.3 57.5
53.8 47.5 45.9 54.4 54.6
56.1 47.1 48.3 56.7 56.8
Vehicle Noise: 63.3 61.6 58.0 53.7 62.3 62.7
Mitigated Noise Levels (with Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
60.9 59.0 57.2 51.1 59.8 60.4
55.3 57.5
53.8 47.5 45.9 54.4 54.6
56.1 47.1 48.3 56.7 56.8
Vehicle Noise: 63.3 61.6 58.0 53.7 62.3 62.7
71.09 77.24
59.44 Road Grade: 1.0%
feet
Wednesday, May 29, 2024
114
1818
FHWA-RD-77-108 HIGHWAY NOISE PREDICTION MODEL (CALVENO) - v10/31/19
SITE SPECIFIC INPUT DATA
Project Name: Esperanza Specific Plan
Job Number: 15662
Lot No: BLDG 4 Analyst: B. Maddux
Road Name: Clifton Ave
Scenario: First Floor With Wall
9,500
10%
32.0 NOISE MODEL INPUTS
Average Daily Traffic (Adt):
Peak Hour Percentage:
Peak Hour Volume: 950 vehicles
Centerline Dist. to Barrier:
Centerline Dist. to Observer: 51.0
Highway Data
feet
feet
vehicles
Road Elevation: 0.0
Barrier Elevation: 0.0
Pad Elevation: 0.0
Site Data
Site Conditions (Hard = 10, Soft = 15)
Medium Trucks (2 Axles): 15
Heavy Trucks (3+ Axles): 15
Autos: 15
Vehicle Mix
feet
feet Lane Equivalent Distance (in feet)
Barrier Height: 0.0
Observer Height (Above Pad): 5.0 feet
feet
Vehicle Speed: 25 mph
Near/Far Lane Distance: 12 feet
REMEL Traffic Flow Distance
0.38 VehicleType Day Evening Night Daily
Medium Trucks:
Heavy Trucks:
Autos: 77.5% 12.9% 9.6% 97.42%
84.8% 4.9% 10.3% 1.84%
86.5% 2.7% 10.8% 0.74%
0.60 Finite Road
-1.20
Barrier Atten
FHWA Noise Model Calculations
Barrier Distance to Observer: 19.0 feet
Barrier Type (0-Wall, 1-Berm): 0.0
0.000 0.000
Fresnel Berm Atten
Medium Trucks:
Heavy Trucks:
Autos:
VehicleType
-16.86 0.63 -1.20 0.000 0.000
-20.82 0.63 -1.20 0.000 0.000
-0.36
-0.65
-1.71
Medium Trucks:
Heavy Trucks:
Autos:
Noise Source Elevations (in feet)
Medium Trucks:
Heavy Trucks:
Autos: 0.00
2.30 8.01
44.878
44.680
44.699
Grade Adjustment: 0.0
Unmitigated Noise Levels (without Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
59.2 57.3 55.6 49.5 58.1 58.7
53.7 55.9
52.1 45.8 44.2 52.7 52.9
54.4 45.4 46.6 55.0 55.1
Vehicle Noise: 61.6 59.9 56.4 52.1 60.6 61.0
Mitigated Noise Levels (with Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
59.2 57.3 55.6 49.5 58.1 58.7
53.7 55.9
52.1 45.8 44.2 52.7 52.9
54.4 45.4 46.6 55.0 55.1
Vehicle Noise: 61.6 59.9 56.4 52.1 60.6 61.0
71.09 77.24
59.44 Road Grade: 1.0%
feet
Wednesday, May 29, 2024
115
1819
FHWA-RD-77-108 HIGHWAY NOISE PREDICTION MODEL (CALVENO) - v10/31/19
SITE SPECIFIC INPUT DATA
Project Name: Esperanza Specific Plan
Job Number: 15662
Lot No: BLDG 4 Analyst: B. Maddux
Road Name: Chatham St
Scenario: First Floor With Wall
9,500
10%
25.0 NOISE MODEL INPUTS
Average Daily Traffic (Adt):
Peak Hour Percentage:
Peak Hour Volume: 950 vehicles
Centerline Dist. to Barrier:
Centerline Dist. to Observer: 33.0
Highway Data
feet
feet
vehicles
Road Elevation: 0.0
Barrier Elevation: 0.0
Pad Elevation: 0.0
Site Data
Site Conditions (Hard = 10, Soft = 15)
Medium Trucks (2 Axles): 15
Heavy Trucks (3+ Axles): 15
Autos: 15
Vehicle Mix
feet
feet Lane Equivalent Distance (in feet)
Barrier Height: 0.0
Observer Height (Above Pad): 5.0 feet
feet
Vehicle Speed: 25 mph
Near/Far Lane Distance: 12 feet
REMEL Traffic Flow Distance
0.38 VehicleType Day Evening Night Daily
Medium Trucks:
Heavy Trucks:
Autos: 77.5% 12.9% 9.6% 97.42%
84.8% 4.9% 10.3% 1.84%
86.5% 2.7% 10.8% 0.74%
3.96 Finite Road
-1.20
Barrier Atten
FHWA Noise Model Calculations
Barrier Distance to Observer: 8.0 feet
Barrier Type (0-Wall, 1-Berm): 0.0
0.000 0.000
Fresnel Berm Atten
Medium Trucks:
Heavy Trucks:
Autos:
VehicleType
-16.86 4.04 -1.20 0.000 0.000
-20.82 4.03 -1.20 0.000 0.000
-0.95
-1.41
-2.82
Medium Trucks:
Heavy Trucks:
Autos:
Noise Source Elevations (in feet)
Medium Trucks:
Heavy Trucks:
Autos: 0.00
2.30 8.01
26.796
26.463
26.496
Grade Adjustment: 0.0
Unmitigated Noise Levels (without Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
62.6 60.7 58.9 52.9 61.5 62.1
57.1 59.3
55.6 49.2 47.7 56.1 56.3
57.8 48.8 50.1 58.4 58.5
Vehicle Noise: 65.0 63.3 59.7 55.5 64.0 64.4
Mitigated Noise Levels (with Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
62.6 60.7 58.9 52.9 61.5 62.1
57.1 59.3
55.6 49.2 47.7 56.1 56.3
57.8 48.8 50.1 58.4 58.5
Vehicle Noise: 65.0 63.3 59.7 55.5 64.0 64.4
71.09 77.24
59.44 Road Grade: 1.0%
feet
Wednesday, May 29, 2024
116
1820
FHWA-RD-77-108 HIGHWAY NOISE PREDICTION MODEL (CALVENO) - v10/31/19
SITE SPECIFIC INPUT DATA
Project Name: Esperanza Specific Plan
Job Number: 15662
Lot No: BLDG 1-3 Analyst: B. Maddux
Road Name: Chatham St
Scenario: First Floor With Wall
9,500
10%
25.0 NOISE MODEL INPUTS
Average Daily Traffic (Adt):
Peak Hour Percentage:
Peak Hour Volume: 950 vehicles
Centerline Dist. to Barrier:
Centerline Dist. to Observer: 35.0
Highway Data
feet
feet
vehicles
Road Elevation: 0.0
Barrier Elevation: 0.0
Pad Elevation: 0.0
Site Data
Site Conditions (Hard = 10, Soft = 15)
Medium Trucks (2 Axles): 15
Heavy Trucks (3+ Axles): 15
Autos: 15
Vehicle Mix
feet
feet Lane Equivalent Distance (in feet)
Barrier Height: 0.0
Observer Height (Above Pad): 5.0 feet
feet
Vehicle Speed: 25 mph
Near/Far Lane Distance: 12 feet
REMEL Traffic Flow Distance
0.38 VehicleType Day Evening Night Daily
Medium Trucks:
Heavy Trucks:
Autos: 77.5% 12.9% 9.6% 97.42%
84.8% 4.9% 10.3% 1.84%
86.5% 2.7% 10.8% 0.74%
3.49 Finite Road
-1.20
Barrier Atten
FHWA Noise Model Calculations
Barrier Distance to Observer: 10.0 feet
Barrier Type (0-Wall, 1-Berm): 0.0
0.000 0.000
Fresnel Berm Atten
Medium Trucks:
Heavy Trucks:
Autos:
VehicleType
-16.86 3.56 -1.20 0.000 0.000
-20.82 3.55 -1.20 0.000 0.000
-0.74
-1.17
-2.59
Medium Trucks:
Heavy Trucks:
Autos:
Noise Source Elevations (in feet)
Medium Trucks:
Heavy Trucks:
Autos: 0.00
2.30 8.01
28.810
28.501
28.531
Grade Adjustment: 0.0
Unmitigated Noise Levels (without Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
62.1 60.2 58.4 52.4 61.0 61.6
56.6 58.8
55.1 48.7 47.2 55.6 55.9
57.4 48.3 49.6 57.9 58.1
Vehicle Noise: 64.5 62.8 59.2 55.0 63.5 63.9
Mitigated Noise Levels (with Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
62.1 60.2 58.4 52.4 61.0 61.6
56.6 58.8
55.1 48.7 47.2 55.6 55.9
57.4 48.3 49.6 57.9 58.1
Vehicle Noise: 64.5 62.8 59.2 55.0 63.5 63.9
71.09 77.24
59.44 Road Grade: 1.0%
feet
Wednesday, May 29, 2024
117
1821
FHWA-RD-77-108 HIGHWAY NOISE PREDICTION MODEL (CALVENO) - v10/31/19
SITE SPECIFIC INPUT DATA
Project Name: Esperanza Specific Plan
Job Number: 15662
Lot No: BLDG 27-28 Analyst: B. Maddux
Road Name: Chatham St
Scenario: First Floor With Wall
9,500
10%
25.0 NOISE MODEL INPUTS
Average Daily Traffic (Adt):
Peak Hour Percentage:
Peak Hour Volume: 950 vehicles
Centerline Dist. to Barrier:
Centerline Dist. to Observer: 43.0
Highway Data
feet
feet
vehicles
Road Elevation: 0.0
Barrier Elevation: 0.0
Pad Elevation: 0.0
Site Data
Site Conditions (Hard = 10, Soft = 15)
Medium Trucks (2 Axles): 15
Heavy Trucks (3+ Axles): 15
Autos: 15
Vehicle Mix
feet
feet Lane Equivalent Distance (in feet)
Barrier Height: 0.0
Observer Height (Above Pad): 5.0 feet
feet
Vehicle Speed: 25 mph
Near/Far Lane Distance: 12 feet
REMEL Traffic Flow Distance
0.38 VehicleType Day Evening Night Daily
Medium Trucks:
Heavy Trucks:
Autos: 77.5% 12.9% 9.6% 97.42%
84.8% 4.9% 10.3% 1.84%
86.5% 2.7% 10.8% 0.74%
1.88 Finite Road
-1.20
Barrier Atten
FHWA Noise Model Calculations
Barrier Distance to Observer: 18.0 feet
Barrier Type (0-Wall, 1-Berm): 0.0
0.000 0.000
Fresnel Berm Atten
Medium Trucks:
Heavy Trucks:
Autos:
VehicleType
-16.86 1.93 -1.20 0.000 0.000
-20.82 1.92 -1.20 0.000 0.000
-0.34
-0.71
-2.13
Medium Trucks:
Heavy Trucks:
Autos:
Noise Source Elevations (in feet)
Medium Trucks:
Heavy Trucks:
Autos: 0.00
2.30 8.01
36.851
36.610
36.634
Grade Adjustment: 0.0
Unmitigated Noise Levels (without Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
60.5 58.6 56.8 50.8 59.4 60.0
55.0 57.1
53.4 47.1 45.5 54.0 54.2
55.7 46.7 47.9 56.3 56.4
Vehicle Noise: 62.9 61.2 57.6 53.4 61.9 62.3
Mitigated Noise Levels (with Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
60.5 58.6 56.8 50.8 59.4 60.0
55.0 57.1
53.4 47.1 45.5 54.0 54.2
55.7 46.7 47.9 56.3 56.4
Vehicle Noise: 62.9 61.2 57.6 53.4 61.9 62.3
71.09 77.24
59.44 Road Grade: 1.0%
feet
Wednesday, May 29, 2024
118
1822
FHWA-RD-77-108 HIGHWAY NOISE PREDICTION MODEL (CALVENO) - v10/31/19
SITE SPECIFIC INPUT DATA
Project Name: Esperanza Specific Plan
Job Number: 15662
Lot No: BLDG 27 Analyst: B. Maddux
Road Name: Amherst Ave
Scenario: First Floor With Wall
9,500
10%
30.0 NOISE MODEL INPUTS
Average Daily Traffic (Adt):
Peak Hour Percentage:
Peak Hour Volume: 950 vehicles
Centerline Dist. to Barrier:
Centerline Dist. to Observer: 40.0
Highway Data
feet
feet
vehicles
Road Elevation: 0.0
Barrier Elevation: 0.0
Pad Elevation: 0.0
Site Data
Site Conditions (Hard = 10, Soft = 15)
Medium Trucks (2 Axles): 15
Heavy Trucks (3+ Axles): 15
Autos: 15
Vehicle Mix
feet
feet Lane Equivalent Distance (in feet)
Barrier Height: 0.0
Observer Height (Above Pad): 5.0 feet
feet
Vehicle Speed: 25 mph
Near/Far Lane Distance: 12 feet
REMEL Traffic Flow Distance
0.38 VehicleType Day Evening Night Daily
Medium Trucks:
Heavy Trucks:
Autos: 77.5% 12.9% 9.6% 97.42%
84.8% 4.9% 10.3% 1.84%
86.5% 2.7% 10.8% 0.74%
2.44 Finite Road
-1.20
Barrier Atten
FHWA Noise Model Calculations
Barrier Distance to Observer: 10.0 feet
Barrier Type (0-Wall, 1-Berm): 0.0
0.000 0.000
Fresnel Berm Atten
Medium Trucks:
Heavy Trucks:
Autos:
VehicleType
-16.86 2.49 -1.20 0.000 0.000
-20.82 2.49 -1.20 0.000 0.000
-0.80
-1.16
-2.30
Medium Trucks:
Heavy Trucks:
Autos:
Noise Source Elevations (in feet)
Medium Trucks:
Heavy Trucks:
Autos: 0.00
2.30 8.01
33.838
33.575
33.601
Grade Adjustment: 0.0
Unmitigated Noise Levels (without Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
61.1 59.2 57.4 51.3 60.0 60.6
55.5 57.7
54.0 47.6 46.1 54.6 54.8
56.3 47.3 48.5 56.9 57.0
Vehicle Noise: 63.5 61.8 58.2 53.9 62.5 62.9
Mitigated Noise Levels (with Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
61.1 59.2 57.4 51.3 60.0 60.6
55.5 57.7
54.0 47.6 46.1 54.6 54.8
56.3 47.3 48.5 56.9 57.0
Vehicle Noise: 63.5 61.8 58.2 53.9 62.5 62.9
71.09 77.24
59.44 Road Grade: 1.0%
feet
Wednesday, May 29, 2024
119
1823
FHWA-RD-77-108 HIGHWAY NOISE PREDICTION MODEL (CALVENO) - v10/31/19
SITE SPECIFIC INPUT DATA
Project Name: Esperanza Specific Plan
Job Number: 15662
Lot No: BLDG 26-22 Analyst: B. Maddux
Road Name: Amherst Ave
Scenario: First Floor With Wall
9,500
10%
30.0 NOISE MODEL INPUTS
Average Daily Traffic (Adt):
Peak Hour Percentage:
Peak Hour Volume: 950 vehicles
Centerline Dist. to Barrier:
Centerline Dist. to Observer: 40.0
Highway Data
feet
feet
vehicles
Road Elevation: 0.0
Barrier Elevation: 0.0
Pad Elevation: 0.0
Site Data
Site Conditions (Hard = 10, Soft = 15)
Medium Trucks (2 Axles): 15
Heavy Trucks (3+ Axles): 15
Autos: 15
Vehicle Mix
feet
feet Lane Equivalent Distance (in feet)
Barrier Height: 0.0
Observer Height (Above Pad): 5.0 feet
feet
Vehicle Speed: 25 mph
Near/Far Lane Distance: 12 feet
REMEL Traffic Flow Distance
0.38 VehicleType Day Evening Night Daily
Medium Trucks:
Heavy Trucks:
Autos: 77.5% 12.9% 9.6% 97.42%
84.8% 4.9% 10.3% 1.84%
86.5% 2.7% 10.8% 0.74%
2.44 Finite Road
-1.20
Barrier Atten
FHWA Noise Model Calculations
Barrier Distance to Observer: 10.0 feet
Barrier Type (0-Wall, 1-Berm): 0.0
0.000 0.000
Fresnel Berm Atten
Medium Trucks:
Heavy Trucks:
Autos:
VehicleType
-16.86 2.49 -1.20 0.000 0.000
-20.82 2.49 -1.20 0.000 0.000
-0.80
-1.16
-2.30
Medium Trucks:
Heavy Trucks:
Autos:
Noise Source Elevations (in feet)
Medium Trucks:
Heavy Trucks:
Autos: 0.00
2.30 8.01
33.838
33.575
33.601
Grade Adjustment: 0.0
Unmitigated Noise Levels (without Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
61.1 59.2 57.4 51.3 60.0 60.6
55.5 57.7
54.0 47.6 46.1 54.6 54.8
56.3 47.3 48.5 56.9 57.0
Vehicle Noise: 63.5 61.8 58.2 53.9 62.5 62.9
Mitigated Noise Levels (with Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
61.1 59.2 57.4 51.3 60.0 60.6
55.5 57.7
54.0 47.6 46.1 54.6 54.8
56.3 47.3 48.5 56.9 57.0
Vehicle Noise: 63.5 61.8 58.2 53.9 62.5 62.9
71.09 77.24
59.44 Road Grade: 0.0%
feet
Wednesday, May 29, 2024
120
1824
FHWA-RD-77-108 HIGHWAY NOISE PREDICTION MODEL (CALVENO) - v10/31/19
SITE SPECIFIC INPUT DATA
Project Name: Esperanza Specific Plan
Job Number: 15662
Lot No: BLDG 20-21 Analyst: B. Maddux
Road Name: Amherst Ave
Scenario: First Floor With Wall
9,500
10%
30.0 NOISE MODEL INPUTS
Average Daily Traffic (Adt):
Peak Hour Percentage:
Peak Hour Volume: 950 vehicles
Centerline Dist. to Barrier:
Centerline Dist. to Observer: 40.0
Highway Data
feet
feet
vehicles
Road Elevation: 0.0
Barrier Elevation: 0.0
Pad Elevation: 0.0
Site Data
Site Conditions (Hard = 10, Soft = 15)
Medium Trucks (2 Axles): 15
Heavy Trucks (3+ Axles): 15
Autos: 15
Vehicle Mix
feet
feet Lane Equivalent Distance (in feet)
Barrier Height: 0.0
Observer Height (Above Pad): 5.0 feet
feet
Vehicle Speed: 25 mph
Near/Far Lane Distance: 12 feet
REMEL Traffic Flow Distance
0.38 VehicleType Day Evening Night Daily
Medium Trucks:
Heavy Trucks:
Autos: 77.5% 12.9% 9.6% 97.42%
84.8% 4.9% 10.3% 1.84%
86.5% 2.7% 10.8% 0.74%
2.44 Finite Road
-1.20
Barrier Atten
FHWA Noise Model Calculations
Barrier Distance to Observer: 10.0 feet
Barrier Type (0-Wall, 1-Berm): 0.0
0.000 0.000
Fresnel Berm Atten
Medium Trucks:
Heavy Trucks:
Autos:
VehicleType
-16.86 2.49 -1.20 0.000 0.000
-20.82 2.49 -1.20 0.000 0.000
-0.80
-1.16
-2.30
Medium Trucks:
Heavy Trucks:
Autos:
Noise Source Elevations (in feet)
Medium Trucks:
Heavy Trucks:
Autos: 0.00
2.30 8.01
33.838
33.575
33.601
Grade Adjustment: 0.0
Unmitigated Noise Levels (without Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
61.1 59.2 57.4 51.3 60.0 60.6
55.5 57.7
54.0 47.6 46.1 54.6 54.8
56.3 47.3 48.5 56.9 57.0
Vehicle Noise: 63.5 61.8 58.2 53.9 62.5 62.9
Mitigated Noise Levels (with Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
61.1 59.2 57.4 51.3 60.0 60.6
55.5 57.7
54.0 47.6 46.1 54.6 54.8
56.3 47.3 48.5 56.9 57.0
Vehicle Noise: 63.5 61.8 58.2 53.9 62.5 62.9
71.09 77.24
59.44 Road Grade: 0.0%
feet
Wednesday, May 29, 2024
121
1825
FHWA-RD-77-108 HIGHWAY NOISE PREDICTION MODEL (CALVENO) - v10/31/19
SITE SPECIFIC INPUT DATA
Project Name: Esperanza Specific Plan
Job Number: 15662
Lot No: BLDG 20 Analyst: B. Maddux
Road Name: Eucalyptus Ave
Scenario: Second Floor With Wall
21,700
10%
83.0 NOISE MODEL INPUTS
Average Daily Traffic (Adt):
Peak Hour Percentage:
Peak Hour Volume: 2,170 vehicles
Centerline Dist. to Barrier:
Centerline Dist. to Observer: 105.0
Highway Data
feet
feet
vehicles
Road Elevation: 0.0
Barrier Elevation: 0.0
Pad Elevation: 0.0
Site Data
Site Conditions (Hard = 10, Soft = 15)
Medium Trucks (2 Axles): 15
Heavy Trucks (3+ Axles): 15
Autos: 15
Vehicle Mix
feet
feet Lane Equivalent Distance (in feet)
Barrier Height: 6.0
Observer Height (Above Pad): 14.0 feet
feet
Vehicle Speed: 40 mph
Near/Far Lane Distance: 40 feet
REMEL Traffic Flow Distance
1.93 VehicleType Day Evening Night Daily
Medium Trucks:
Heavy Trucks:
Autos: 77.5% 12.9% 9.6% 97.42%
84.8% 4.9% 10.3% 1.84%
86.5% 2.7% 10.8% 0.74%
-3.47
Finite Road
-1.20
Barrier Atten
FHWA Noise Model Calculations
Barrier Distance to Observer: 22.0 feet
Barrier Type (0-Wall, 1-Berm): 0.0
0.000 0.000
Fresnel Berm Atten
Medium Trucks:
Heavy Trucks:
Autos:
VehicleType
-15.31 -3.44 -1.20 0.000 0.000
-19.27 -3.39 -1.20 0.000 0.000
-0.54
-0.70
-1.20
Medium Trucks:
Heavy Trucks:
Autos:
Noise Source Elevations (in feet)
Medium Trucks:
Heavy Trucks:
Autos: 0.00
2.30 8.01
83.791
83.438
82.831
Grade Adjustment: 0.0
Unmitigated Noise Levels (without Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
64.6 62.7 61.0 54.9 63.5 64.1
56.4 57.3
54.9 48.5 46.9 55.4 55.6
55.9 46.8 48.1 56.4 56.6
Vehicle Noise: 65.9 64.1 61.3 56.3 64.8 65.3
Mitigated Noise Levels (with Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
64.6 62.7 61.0 54.9 63.5 64.1
56.4 57.3
54.9 48.5 46.9 55.4 55.6
55.9 46.8 48.1 56.4 56.6
Vehicle Noise: 65.9 64.1 61.3 56.3 64.8 65.3
76.31 81.16
67.36 Road Grade: 1.0%
feet
Wednesday, May 29, 2024
122
1826
FHWA-RD-77-108 HIGHWAY NOISE PREDICTION MODEL (CALVENO) - v10/31/19
SITE SPECIFIC INPUT DATA
Project Name: Esperanza Specific Plan
Job Number: 15662
Lot No: BLDG 7-14 Analyst: B. Maddux
Road Name: Eucalyptus Ave
Scenario: Second Floor With Wall
21,700
10%
83.0 NOISE MODEL INPUTS
Average Daily Traffic (Adt):
Peak Hour Percentage:
Peak Hour Volume: 2,170 vehicles
Centerline Dist. to Barrier:
Centerline Dist. to Observer: 103.0
Highway Data
feet
feet
vehicles
Road Elevation: 0.0
Barrier Elevation: 0.0
Pad Elevation: 0.0
Site Data
Site Conditions (Hard = 10, Soft = 15)
Medium Trucks (2 Axles): 15
Heavy Trucks (3+ Axles): 15
Autos: 15
Vehicle Mix
feet
feet Lane Equivalent Distance (in feet)
Barrier Height: 6.0
Observer Height (Above Pad): 14.0 feet
feet
Vehicle Speed: 40 mph
Near/Far Lane Distance: 40 feet
REMEL Traffic Flow Distance
1.93 VehicleType Day Evening Night Daily
Medium Trucks:
Heavy Trucks:
Autos: 77.5% 12.9% 9.6% 97.42%
84.8% 4.9% 10.3% 1.84%
86.5% 2.7% 10.8% 0.74%
-3.31
Finite Road
-1.20
Barrier Atten
FHWA Noise Model Calculations
Barrier Distance to Observer: 20.0 feet
Barrier Type (0-Wall, 1-Berm): 0.0
0.000 0.000
Fresnel Berm Atten
Medium Trucks:
Heavy Trucks:
Autos:
VehicleType
-15.31 -3.28 -1.20 0.000 0.000
-19.27 -3.23 -1.20 0.000 0.000
-0.64
-0.81
-1.33
Medium Trucks:
Heavy Trucks:
Autos:
Noise Source Elevations (in feet)
Medium Trucks:
Heavy Trucks:
Autos: 0.00
2.30 8.01
81.762
81.400
80.777
Grade Adjustment: 0.0
Unmitigated Noise Levels (without Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
64.8 62.9 61.1 55.1 63.7 64.3
56.5 57.5
55.0 48.7 47.1 55.6 55.8
56.0 47.0 48.3 56.6 56.7
Vehicle Noise: 66.0 64.2 61.5 56.4 65.0 65.5
Mitigated Noise Levels (with Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
64.8 62.9 61.1 55.1 63.7 64.3
56.5 57.5
55.0 48.7 47.1 55.6 55.8
56.0 47.0 48.3 56.6 56.7
Vehicle Noise: 66.0 64.2 61.5 56.4 65.0 65.5
76.31 81.16
67.36 Road Grade: 1.0%
feet
Wednesday, May 29, 2024
123
1827
FHWA-RD-77-108 HIGHWAY NOISE PREDICTION MODEL (CALVENO) - v10/31/19
SITE SPECIFIC INPUT DATA
Project Name: Esperanza Specific Plan
Job Number: 15662
Lot No: BLDG 6 Analyst: B. Maddux
Road Name: Eucalyptus Ave
Scenario: Second Floor With Wall
21,700
10%
84.0 NOISE MODEL INPUTS
Average Daily Traffic (Adt):
Peak Hour Percentage:
Peak Hour Volume: 2,170 vehicles
Centerline Dist. to Barrier:
Centerline Dist. to Observer: 104.0
Highway Data
feet
feet
vehicles
Road Elevation: 0.0
Barrier Elevation: 0.0
Pad Elevation: 0.0
Site Data
Site Conditions (Hard = 10, Soft = 15)
Medium Trucks (2 Axles): 15
Heavy Trucks (3+ Axles): 15
Autos: 15
Vehicle Mix
feet
feet Lane Equivalent Distance (in feet)
Barrier Height: 6.0
Observer Height (Above Pad): 14.0 feet
feet
Vehicle Speed: 40 mph
Near/Far Lane Distance: 40 feet
REMEL Traffic Flow Distance
1.93 VehicleType Day Evening Night Daily
Medium Trucks:
Heavy Trucks:
Autos: 77.5% 12.9% 9.6% 97.42%
84.8% 4.9% 10.3% 1.84%
86.5% 2.7% 10.8% 0.74%
-3.39
Finite Road
-1.20
Barrier Atten
FHWA Noise Model Calculations
Barrier Distance to Observer: 20.0 feet
Barrier Type (0-Wall, 1-Berm): 0.0
0.000 0.000
Fresnel Berm Atten
Medium Trucks:
Heavy Trucks:
Autos:
VehicleType
-15.31 -3.36 -1.20 0.000 0.000
-19.27 -3.31 -1.20 0.000 0.000
-0.65
-0.82
-1.33
Medium Trucks:
Heavy Trucks:
Autos:
Noise Source Elevations (in feet)
Medium Trucks:
Heavy Trucks:
Autos: 0.00
2.30 8.01
82.777
82.419
81.804
Grade Adjustment: 0.0
Unmitigated Noise Levels (without Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
64.7 62.8 61.0 55.0 63.6 64.2
56.4 57.4
54.9 48.6 47.0 55.5 55.7
56.0 46.9 48.2 56.5 56.7
Vehicle Noise: 66.0 64.2 61.4 56.3 64.9 65.4
Mitigated Noise Levels (with Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
64.7 62.8 61.0 55.0 63.6 64.2
56.4 57.4
54.9 48.6 47.0 55.5 55.7
56.0 46.9 48.2 56.5 56.7
Vehicle Noise: 66.0 64.2 61.4 56.3 64.9 65.4
76.31 81.16
67.36 Road Grade: 1.0%
feet
Wednesday, May 29, 2024
124
1828
FHWA-RD-77-108 HIGHWAY NOISE PREDICTION MODEL (CALVENO) - v10/31/19
SITE SPECIFIC INPUT DATA
Project Name: Esperanza Specific Plan
Job Number: 15662
Lot No: BLDG 5-6 Analyst: B. Maddux
Road Name: Clifton Ave
Scenario: Second Floor With Wall
9,500
10%
31.0 NOISE MODEL INPUTS
Average Daily Traffic (Adt):
Peak Hour Percentage:
Peak Hour Volume: 950 vehicles
Centerline Dist. to Barrier:
Centerline Dist. to Observer: 41.0
Highway Data
feet
feet
vehicles
Road Elevation: 0.0
Barrier Elevation: 0.0
Pad Elevation: 0.0
Site Data
Site Conditions (Hard = 10, Soft = 15)
Medium Trucks (2 Axles): 15
Heavy Trucks (3+ Axles): 15
Autos: 15
Vehicle Mix
feet
feet Lane Equivalent Distance (in feet)
Barrier Height: 0.0
Observer Height (Above Pad): 14.0 feet
feet
Vehicle Speed: 25 mph
Near/Far Lane Distance: 12 feet
REMEL Traffic Flow Distance
0.38 VehicleType Day Evening Night Daily
Medium Trucks:
Heavy Trucks:
Autos: 77.5% 12.9% 9.6% 97.42%
84.8% 4.9% 10.3% 1.84%
86.5% 2.7% 10.8% 0.74%
1.82 Finite Road
-1.20
Barrier Atten
FHWA Noise Model Calculations
Barrier Distance to Observer: 10.0 feet
Barrier Type (0-Wall, 1-Berm): 0.0
0.000 0.000
Fresnel Berm Atten
Medium Trucks:
Heavy Trucks:
Autos:
VehicleType
-16.86 1.96 -1.20 0.000 0.000
-20.82 2.22 -1.20 0.000 0.000
-4.41
-5.29
-7.77
Medium Trucks:
Heavy Trucks:
Autos:
Noise Source Elevations (in feet)
Medium Trucks:
Heavy Trucks:
Autos: 0.00
2.30 8.01
37.216
36.414
34.999
Grade Adjustment: 0.0
Unmitigated Noise Levels (without Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
60.4 58.5 56.8 50.7 59.3 59.9
55.0 57.4
53.5 47.1 45.6 54.0 54.3
56.0 47.0 48.2 56.6 56.7
Vehicle Noise: 63.0 61.3 57.6 53.4 62.0 62.4
Mitigated Noise Levels (with Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
60.4 58.5 56.8 50.7 59.3 59.9
55.0 57.4
53.5 47.1 45.6 54.0 54.3
56.0 47.0 48.2 56.6 56.7
Vehicle Noise: 63.0 61.3 57.6 53.4 62.0 62.4
71.09 77.24
59.44 Road Grade: 1.0%
feet
Wednesday, May 29, 2024
125
1829
FHWA-RD-77-108 HIGHWAY NOISE PREDICTION MODEL (CALVENO) - v10/31/19
SITE SPECIFIC INPUT DATA
Project Name: Esperanza Specific Plan
Job Number: 15662
Lot No: BLDG 4 Analyst: B. Maddux
Road Name: Clifton Ave
Scenario: Second Floor With Wall
9,500
10%
32.0 NOISE MODEL INPUTS
Average Daily Traffic (Adt):
Peak Hour Percentage:
Peak Hour Volume: 950 vehicles
Centerline Dist. to Barrier:
Centerline Dist. to Observer: 51.0
Highway Data
feet
feet
vehicles
Road Elevation: 0.0
Barrier Elevation: 0.0
Pad Elevation: 0.0
Site Data
Site Conditions (Hard = 10, Soft = 15)
Medium Trucks (2 Axles): 15
Heavy Trucks (3+ Axles): 15
Autos: 15
Vehicle Mix
feet
feet Lane Equivalent Distance (in feet)
Barrier Height: 0.0
Observer Height (Above Pad): 14.0 feet
feet
Vehicle Speed: 25 mph
Near/Far Lane Distance: 12 feet
REMEL Traffic Flow Distance
0.38 VehicleType Day Evening Night Daily
Medium Trucks:
Heavy Trucks:
Autos: 77.5% 12.9% 9.6% 97.42%
84.8% 4.9% 10.3% 1.84%
86.5% 2.7% 10.8% 0.74%
0.34 Finite Road
-1.20
Barrier Atten
FHWA Noise Model Calculations
Barrier Distance to Observer: 19.0 feet
Barrier Type (0-Wall, 1-Berm): 0.0
0.000 0.000
Fresnel Berm Atten
Medium Trucks:
Heavy Trucks:
Autos:
VehicleType
-16.86 0.42 -1.20 0.000 0.000
-20.82 0.58 -1.20 0.000 0.000
-2.42
-3.14
-5.29
Medium Trucks:
Heavy Trucks:
Autos:
Noise Source Elevations (in feet)
Medium Trucks:
Heavy Trucks:
Autos: 0.00
2.30 8.01
46.744
46.108
44.999
Grade Adjustment: 0.0
Unmitigated Noise Levels (without Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
59.0 57.1 55.3 49.2 57.9 58.5
53.5 55.8
51.9 45.6 44.0 52.5 52.7
54.4 45.4 46.6 55.0 55.1
Vehicle Noise: 61.4 59.7 56.1 51.9 60.4 60.8
Mitigated Noise Levels (with Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
59.0 57.1 55.3 49.2 57.9 58.5
53.5 55.8
51.9 45.6 44.0 52.5 52.7
54.4 45.4 46.6 55.0 55.1
Vehicle Noise: 61.4 59.7 56.1 51.9 60.4 60.8
71.09 77.24
59.44 Road Grade: 1.0%
feet
Wednesday, May 29, 2024
126
1830
FHWA-RD-77-108 HIGHWAY NOISE PREDICTION MODEL (CALVENO) - v10/31/19
SITE SPECIFIC INPUT DATA
Project Name: Esperanza Specific Plan
Job Number: 15662
Lot No: BLDG 4 Analyst: B. Maddux
Road Name: Chatham St
Scenario: Second Floor With Wall
9,500
10%
25.0 NOISE MODEL INPUTS
Average Daily Traffic (Adt):
Peak Hour Percentage:
Peak Hour Volume: 950 vehicles
Centerline Dist. to Barrier:
Centerline Dist. to Observer: 33.0
Highway Data
feet
feet
vehicles
Road Elevation: 0.0
Barrier Elevation: 0.0
Pad Elevation: 0.0
Site Data
Site Conditions (Hard = 10, Soft = 15)
Medium Trucks (2 Axles): 15
Heavy Trucks (3+ Axles): 15
Autos: 15
Vehicle Mix
feet
feet Lane Equivalent Distance (in feet)
Barrier Height: 0.0
Observer Height (Above Pad): 14.0 feet
feet
Vehicle Speed: 25 mph
Near/Far Lane Distance: 12 feet
REMEL Traffic Flow Distance
0.38 VehicleType Day Evening Night Daily
Medium Trucks:
Heavy Trucks:
Autos: 77.5% 12.9% 9.6% 97.42%
84.8% 4.9% 10.3% 1.84%
86.5% 2.7% 10.8% 0.74%
3.26 Finite Road
-1.20
Barrier Atten
FHWA Noise Model Calculations
Barrier Distance to Observer: 8.0 feet
Barrier Type (0-Wall, 1-Berm): 0.0
0.000 0.000
Fresnel Berm Atten
Medium Trucks:
Heavy Trucks:
Autos:
VehicleType
-16.86 3.49 -1.20 0.000 0.000
-20.82 3.91 -1.20 0.000 0.000
-4.61
-5.71
-8.89
Medium Trucks:
Heavy Trucks:
Autos:
Noise Source Elevations (in feet)
Medium Trucks:
Heavy Trucks:
Autos: 0.00
2.30 8.01
29.816
28.809
26.999
Grade Adjustment: 0.0
Unmitigated Noise Levels (without Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
61.9 60.0 58.2 52.2 60.8 61.4
56.5 59.1
55.0 48.6 47.1 55.6 55.8
57.7 48.7 49.9 58.3 58.4
Vehicle Noise: 64.5 62.8 59.1 55.0 63.5 63.9
Mitigated Noise Levels (with Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
61.9 60.0 58.2 52.2 60.8 61.4
56.5 59.1
55.0 48.6 47.1 55.6 55.8
57.7 48.7 49.9 58.3 58.4
Vehicle Noise: 64.5 62.8 59.1 55.0 63.5 63.9
71.09 77.24
59.44 Road Grade: 1.0%
feet
Wednesday, May 29, 2024
127
1831
FHWA-RD-77-108 HIGHWAY NOISE PREDICTION MODEL (CALVENO) - v10/31/19
SITE SPECIFIC INPUT DATA
Project Name: Esperanza Specific Plan
Job Number: 15662
Lot No: BLDG 1-3 Analyst: B. Maddux
Road Name: Chatham St
Scenario: Second Floor With Wall
9,500
10%
25.0 NOISE MODEL INPUTS
Average Daily Traffic (Adt):
Peak Hour Percentage:
Peak Hour Volume: 950 vehicles
Centerline Dist. to Barrier:
Centerline Dist. to Observer: 35.0
Highway Data
feet
feet
vehicles
Road Elevation: 0.0
Barrier Elevation: 0.0
Pad Elevation: 0.0
Site Data
Site Conditions (Hard = 10, Soft = 15)
Medium Trucks (2 Axles): 15
Heavy Trucks (3+ Axles): 15
Autos: 15
Vehicle Mix
feet
feet Lane Equivalent Distance (in feet)
Barrier Height: 0.0
Observer Height (Above Pad): 14.0 feet
feet
Vehicle Speed: 25 mph
Near/Far Lane Distance: 12 feet
REMEL Traffic Flow Distance
0.38 VehicleType Day Evening Night Daily
Medium Trucks:
Heavy Trucks:
Autos: 77.5% 12.9% 9.6% 97.42%
84.8% 4.9% 10.3% 1.84%
86.5% 2.7% 10.8% 0.74%
2.88 Finite Road
-1.20
Barrier Atten
FHWA Noise Model Calculations
Barrier Distance to Observer: 10.0 feet
Barrier Type (0-Wall, 1-Berm): 0.0
0.000 0.000
Fresnel Berm Atten
Medium Trucks:
Heavy Trucks:
Autos:
VehicleType
-16.86 3.08 -1.20 0.000 0.000
-20.82 3.45 -1.20 0.000 0.000
-3.92
-4.96
-8.03
Medium Trucks:
Heavy Trucks:
Autos:
Noise Source Elevations (in feet)
Medium Trucks:
Heavy Trucks:
Autos: 0.00
2.30 8.01
31.639
30.691
28.999
Grade Adjustment: 0.0
Unmitigated Noise Levels (without Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
61.5 59.6 57.8 51.8 60.4 61.0
56.1 58.7
54.6 48.2 46.7 55.2 55.4
57.2 48.2 49.5 57.8 57.9
Vehicle Noise: 64.1 62.4 58.7 54.6 63.1 63.5
Mitigated Noise Levels (with Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
61.5 59.6 57.8 51.8 60.4 61.0
56.1 58.7
54.6 48.2 46.7 55.2 55.4
57.2 48.2 49.5 57.8 57.9
Vehicle Noise: 64.1 62.4 58.7 54.6 63.1 63.5
71.09 77.24
59.44 Road Grade: 1.0%
feet
Wednesday, May 29, 2024
128
1832
FHWA-RD-77-108 HIGHWAY NOISE PREDICTION MODEL (CALVENO) - v10/31/19
SITE SPECIFIC INPUT DATA
Project Name: Esperanza Specific Plan
Job Number: 15662
Lot No: BLDG 27-28 Analyst: B. Maddux
Road Name: Chatham St
Scenario: Second Floor With Wall
9,500
10%
25.0 NOISE MODEL INPUTS
Average Daily Traffic (Adt):
Peak Hour Percentage:
Peak Hour Volume: 950 vehicles
Centerline Dist. to Barrier:
Centerline Dist. to Observer: 43.0
Highway Data
feet
feet
vehicles
Road Elevation: 0.0
Barrier Elevation: 0.0
Pad Elevation: 0.0
Site Data
Site Conditions (Hard = 10, Soft = 15)
Medium Trucks (2 Axles): 15
Heavy Trucks (3+ Axles): 15
Autos: 15
Vehicle Mix
feet
feet Lane Equivalent Distance (in feet)
Barrier Height: 0.0
Observer Height (Above Pad): 14.0 feet
feet
Vehicle Speed: 25 mph
Near/Far Lane Distance: 12 feet
REMEL Traffic Flow Distance
0.38 VehicleType Day Evening Night Daily
Medium Trucks:
Heavy Trucks:
Autos: 77.5% 12.9% 9.6% 97.42%
84.8% 4.9% 10.3% 1.84%
86.5% 2.7% 10.8% 0.74%
1.50 Finite Road
-1.20
Barrier Atten
FHWA Noise Model Calculations
Barrier Distance to Observer: 18.0 feet
Barrier Type (0-Wall, 1-Berm): 0.0
0.000 0.000
Fresnel Berm Atten
Medium Trucks:
Heavy Trucks:
Autos:
VehicleType
-16.86 1.63 -1.20 0.000 0.000
-20.82 1.86 -1.20 0.000 0.000
-2.19
-3.07
-5.81
Medium Trucks:
Heavy Trucks:
Autos:
Noise Source Elevations (in feet)
Medium Trucks:
Heavy Trucks:
Autos: 0.00
2.30 8.01
39.102
38.340
36.999
Grade Adjustment: 0.0
Unmitigated Noise Levels (without Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
60.1 58.2 56.5 50.4 59.0 59.6
54.7 57.1
53.1 46.8 45.2 53.7 53.9
55.7 46.6 47.9 56.2 56.4
Vehicle Noise: 62.6 60.9 57.3 53.1 61.6 62.0
Mitigated Noise Levels (with Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
60.1 58.2 56.5 50.4 59.0 59.6
54.7 57.1
53.1 46.8 45.2 53.7 53.9
55.7 46.6 47.9 56.2 56.4
Vehicle Noise: 62.6 60.9 57.3 53.1 61.6 62.0
71.09 77.24
59.44 Road Grade: 1.0%
feet
Wednesday, May 29, 2024
129
1833
FHWA-RD-77-108 HIGHWAY NOISE PREDICTION MODEL (CALVENO) - v10/31/19
SITE SPECIFIC INPUT DATA
Project Name: Esperanza Specific Plan
Job Number: 15662
Lot No: BLDG 27 Analyst: B. Maddux
Road Name: Amherst Ave
Scenario: Second Floor With Wall
9,500
10%
30.0 NOISE MODEL INPUTS
Average Daily Traffic (Adt):
Peak Hour Percentage:
Peak Hour Volume: 950 vehicles
Centerline Dist. to Barrier:
Centerline Dist. to Observer: 40.0
Highway Data
feet
feet
vehicles
Road Elevation: 0.0
Barrier Elevation: 0.0
Pad Elevation: 0.0
Site Data
Site Conditions (Hard = 10, Soft = 15)
Medium Trucks (2 Axles): 15
Heavy Trucks (3+ Axles): 15
Autos: 15
Vehicle Mix
feet
feet Lane Equivalent Distance (in feet)
Barrier Height: 0.0
Observer Height (Above Pad): 14.0 feet
feet
Vehicle Speed: 25 mph
Near/Far Lane Distance: 12 feet
REMEL Traffic Flow Distance
0.38 VehicleType Day Evening Night Daily
Medium Trucks:
Heavy Trucks:
Autos: 77.5% 12.9% 9.6% 97.42%
84.8% 4.9% 10.3% 1.84%
86.5% 2.7% 10.8% 0.74%
1.99 Finite Road
-1.20
Barrier Atten
FHWA Noise Model Calculations
Barrier Distance to Observer: 10.0 feet
Barrier Type (0-Wall, 1-Berm): 0.0
0.000 0.000
Fresnel Berm Atten
Medium Trucks:
Heavy Trucks:
Autos:
VehicleType
-16.86 2.14 -1.20 0.000 0.000
-20.82 2.41 -1.20 0.000 0.000
-4.34
-5.24
-7.81
Medium Trucks:
Heavy Trucks:
Autos:
Noise Source Elevations (in feet)
Medium Trucks:
Heavy Trucks:
Autos: 0.00
2.30 8.01
36.277
35.454
33.999
Grade Adjustment: 0.0
Unmitigated Noise Levels (without Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
60.6 58.7 56.9 50.9 59.5 60.1
55.2 57.6
53.7 47.3 45.8 54.2 54.4
56.2 47.2 48.4 56.8 56.9
Vehicle Noise: 63.1 61.4 57.8 53.6 62.1 62.5
Mitigated Noise Levels (with Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
60.6 58.7 56.9 50.9 59.5 60.1
55.2 57.6
53.7 47.3 45.8 54.2 54.4
56.2 47.2 48.4 56.8 56.9
Vehicle Noise: 63.1 61.4 57.8 53.6 62.1 62.5
71.09 77.24
59.44 Road Grade: 1.0%
feet
Wednesday, May 29, 2024
130
1834
FHWA-RD-77-108 HIGHWAY NOISE PREDICTION MODEL (CALVENO) - v10/31/19
SITE SPECIFIC INPUT DATA
Project Name: Esperanza Specific Plan
Job Number: 15662
Lot No: BLDG 26-22 Analyst: B. Maddux
Road Name: Amherst Ave
Scenario: Second Floor With Wall
9,500
10%
30.0 NOISE MODEL INPUTS
Average Daily Traffic (Adt):
Peak Hour Percentage:
Peak Hour Volume: 950 vehicles
Centerline Dist. to Barrier:
Centerline Dist. to Observer: 40.0
Highway Data
feet
feet
vehicles
Road Elevation: 0.0
Barrier Elevation: 0.0
Pad Elevation: 0.0
Site Data
Site Conditions (Hard = 10, Soft = 15)
Medium Trucks (2 Axles): 15
Heavy Trucks (3+ Axles): 15
Autos: 15
Vehicle Mix
feet
feet Lane Equivalent Distance (in feet)
Barrier Height: 0.0
Observer Height (Above Pad): 14.0 feet
feet
Vehicle Speed: 25 mph
Near/Far Lane Distance: 12 feet
REMEL Traffic Flow Distance
0.38 VehicleType Day Evening Night Daily
Medium Trucks:
Heavy Trucks:
Autos: 77.5% 12.9% 9.6% 97.42%
84.8% 4.9% 10.3% 1.84%
86.5% 2.7% 10.8% 0.74%
1.99 Finite Road
-1.20
Barrier Atten
FHWA Noise Model Calculations
Barrier Distance to Observer: 10.0 feet
Barrier Type (0-Wall, 1-Berm): 0.0
0.000 0.000
Fresnel Berm Atten
Medium Trucks:
Heavy Trucks:
Autos:
VehicleType
-16.86 2.14 -1.20 0.000 0.000
-20.82 2.41 -1.20 0.000 0.000
-4.34
-5.24
-7.81
Medium Trucks:
Heavy Trucks:
Autos:
Noise Source Elevations (in feet)
Medium Trucks:
Heavy Trucks:
Autos: 0.00
2.30 8.01
36.277
35.454
33.999
Grade Adjustment: 0.0
Unmitigated Noise Levels (without Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
60.6 58.7 56.9 50.9 59.5 60.1
55.2 57.6
53.7 47.3 45.8 54.2 54.4
56.2 47.2 48.4 56.8 56.9
Vehicle Noise: 63.1 61.4 57.8 53.6 62.1 62.5
Mitigated Noise Levels (with Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
60.6 58.7 56.9 50.9 59.5 60.1
55.2 57.6
53.7 47.3 45.8 54.2 54.4
56.2 47.2 48.4 56.8 56.9
Vehicle Noise: 63.1 61.4 57.8 53.6 62.1 62.5
71.09 77.24
59.44 Road Grade: 0.0%
feet
Wednesday, May 29, 2024
131
1835
FHWA-RD-77-108 HIGHWAY NOISE PREDICTION MODEL (CALVENO) - v10/31/19
SITE SPECIFIC INPUT DATA
Project Name: Esperanza Specific Plan
Job Number: 15662
Lot No: BLDG 20-21 Analyst: B. Maddux
Road Name: Amherst Ave
Scenario: Second Floor With Wall
9,500
10%
30.0 NOISE MODEL INPUTS
Average Daily Traffic (Adt):
Peak Hour Percentage:
Peak Hour Volume: 950 vehicles
Centerline Dist. to Barrier:
Centerline Dist. to Observer: 40.0
Highway Data
feet
feet
vehicles
Road Elevation: 0.0
Barrier Elevation: 0.0
Pad Elevation: 0.0
Site Data
Site Conditions (Hard = 10, Soft = 15)
Medium Trucks (2 Axles): 15
Heavy Trucks (3+ Axles): 15
Autos: 15
Vehicle Mix
feet
feet Lane Equivalent Distance (in feet)
Barrier Height: 0.0
Observer Height (Above Pad): 14.0 feet
feet
Vehicle Speed: 25 mph
Near/Far Lane Distance: 12 feet
REMEL Traffic Flow Distance
0.38 VehicleType Day Evening Night Daily
Medium Trucks:
Heavy Trucks:
Autos: 77.5% 12.9% 9.6% 97.42%
84.8% 4.9% 10.3% 1.84%
86.5% 2.7% 10.8% 0.74%
1.99 Finite Road
-1.20
Barrier Atten
FHWA Noise Model Calculations
Barrier Distance to Observer: 10.0 feet
Barrier Type (0-Wall, 1-Berm): 0.0
0.000 0.000
Fresnel Berm Atten
Medium Trucks:
Heavy Trucks:
Autos:
VehicleType
-16.86 2.14 -1.20 0.000 0.000
-20.82 2.41 -1.20 0.000 0.000
-4.34
-5.24
-7.81
Medium Trucks:
Heavy Trucks:
Autos:
Noise Source Elevations (in feet)
Medium Trucks:
Heavy Trucks:
Autos: 0.00
2.30 8.01
36.277
35.454
33.999
Grade Adjustment: 0.0
Unmitigated Noise Levels (without Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
60.6 58.7 56.9 50.9 59.5 60.1
55.2 57.6
53.7 47.3 45.8 54.2 54.4
56.2 47.2 48.4 56.8 56.9
Vehicle Noise: 63.1 61.4 57.8 53.6 62.1 62.5
Mitigated Noise Levels (with Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
60.6 58.7 56.9 50.9 59.5 60.1
55.2 57.6
53.7 47.3 45.8 54.2 54.4
56.2 47.2 48.4 56.8 56.9
Vehicle Noise: 63.1 61.4 57.8 53.6 62.1 62.5
71.09 77.24
59.44 Road Grade: 0.0%
feet
Wednesday, May 29, 2024
132
1836
FHWA-RD-77-108 HIGHWAY NOISE PREDICTION MODEL (CALVENO) - v10/31/19
SITE SPECIFIC INPUT DATA
Project Name: Esperanza Specific Plan
Job Number: 15662
Lot No: BLDG 20 Analyst: B. Maddux
Road Name: Eucalyptus Ave
Scenario: Third Floor With Wall
21,700
10%
83.0 NOISE MODEL INPUTS
Average Daily Traffic (Adt):
Peak Hour Percentage:
Peak Hour Volume: 2,170 vehicles
Centerline Dist. to Barrier:
Centerline Dist. to Observer: 105.0
Highway Data
feet
feet
vehicles
Road Elevation: 0.0
Barrier Elevation: 0.0
Pad Elevation: 0.0
Site Data
Site Conditions (Hard = 10, Soft = 15)
Medium Trucks (2 Axles): 15
Heavy Trucks (3+ Axles): 15
Autos: 15
Vehicle Mix
feet
feet Lane Equivalent Distance (in feet)
Barrier Height: 6.0
Observer Height (Above Pad): 23.0 feet
feet
Vehicle Speed: 40 mph
Near/Far Lane Distance: 40 feet
REMEL Traffic Flow Distance
1.93 VehicleType Day Evening Night Daily
Medium Trucks:
Heavy Trucks:
Autos: 77.5% 12.9% 9.6% 97.42%
84.8% 4.9% 10.3% 1.84%
86.5% 2.7% 10.8% 0.74%
-3.62
Finite Road
-1.20
Barrier Atten
FHWA Noise Model Calculations
Barrier Distance to Observer: 22.0 feet
Barrier Type (0-Wall, 1-Berm): 0.0
0.000 0.000
Fresnel Berm Atten
Medium Trucks:
Heavy Trucks:
Autos:
VehicleType
-15.31 -3.57 -1.20 0.000 0.000
-19.27 -3.48 -1.20 0.000 0.000
-2.97
-3.35
-4.42
Medium Trucks:
Heavy Trucks:
Autos:
Noise Source Elevations (in feet)
Medium Trucks:
Heavy Trucks:
Autos: 0.00
2.30 8.01
85.755
85.168
83.963
Grade Adjustment: 0.0
Unmitigated Noise Levels (without Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
64.5 62.6 60.8 54.7 63.4 64.0
56.2 57.2
54.7 48.4 46.8 55.3 55.5
55.8 46.8 48.0 56.4 56.5
Vehicle Noise: 65.7 63.9 61.2 56.1 64.7 65.2
Mitigated Noise Levels (with Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
64.5 62.6 60.8 54.7 63.4 64.0
56.2 57.2
54.7 48.4 46.8 55.3 55.5
55.8 46.8 48.0 56.4 56.5
Vehicle Noise: 65.7 63.9 61.2 56.1 64.7 65.2
76.31 81.16
67.36 Road Grade: 1.0%
feet
Wednesday, May 29, 2024
133
1837
FHWA-RD-77-108 HIGHWAY NOISE PREDICTION MODEL (CALVENO) - v10/31/19
SITE SPECIFIC INPUT DATA
Project Name: Esperanza Specific Plan
Job Number: 15662
Lot No: BLDG 7-14 Analyst: B. Maddux
Road Name: Eucalyptus Ave
Scenario: Third Floor With Wall
21,700
10%
83.0 NOISE MODEL INPUTS
Average Daily Traffic (Adt):
Peak Hour Percentage:
Peak Hour Volume: 2,170 vehicles
Centerline Dist. to Barrier:
Centerline Dist. to Observer: 103.0
Highway Data
feet
feet
vehicles
Road Elevation: 0.0
Barrier Elevation: 0.0
Pad Elevation: 0.0
Site Data
Site Conditions (Hard = 10, Soft = 15)
Medium Trucks (2 Axles): 15
Heavy Trucks (3+ Axles): 15
Autos: 15
Vehicle Mix
feet
feet Lane Equivalent Distance (in feet)
Barrier Height: 6.0
Observer Height (Above Pad): 23.0 feet
feet
Vehicle Speed: 40 mph
Near/Far Lane Distance: 40 feet
REMEL Traffic Flow Distance
1.93 VehicleType Day Evening Night Daily
Medium Trucks:
Heavy Trucks:
Autos: 77.5% 12.9% 9.6% 97.42%
84.8% 4.9% 10.3% 1.84%
86.5% 2.7% 10.8% 0.74%
-3.47
Finite Road
-1.20
Barrier Atten
FHWA Noise Model Calculations
Barrier Distance to Observer: 20.0 feet
Barrier Type (0-Wall, 1-Berm): 0.0
0.000 0.000
Fresnel Berm Atten
Medium Trucks:
Heavy Trucks:
Autos:
VehicleType
-15.31 -3.42 -1.20 0.000 0.000
-19.27 -3.32 -1.20 0.000 0.000
-3.33
-3.73
-4.83
Medium Trucks:
Heavy Trucks:
Autos:
Noise Source Elevations (in feet)
Medium Trucks:
Heavy Trucks:
Autos: 0.00
2.30 8.01
83.774
83.172
81.938
Grade Adjustment: 0.0
Unmitigated Noise Levels (without Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
64.6 62.7 61.0 54.9 63.5 64.1
56.4 57.4
54.9 48.5 47.0 55.4 55.7
55.9 46.9 48.2 56.5 56.6
Vehicle Noise: 65.9 64.1 61.4 56.3 64.8 65.3
Mitigated Noise Levels (with Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
64.6 62.7 61.0 54.9 63.5 64.1
56.4 57.4
54.9 48.5 47.0 55.4 55.7
55.9 46.9 48.2 56.5 56.6
Vehicle Noise: 65.9 64.1 61.4 56.3 64.8 65.3
76.31 81.16
67.36 Road Grade: 1.0%
feet
Wednesday, May 29, 2024
134
1838
FHWA-RD-77-108 HIGHWAY NOISE PREDICTION MODEL (CALVENO) - v10/31/19
SITE SPECIFIC INPUT DATA
Project Name: Esperanza Specific Plan
Job Number: 15662
Lot No: BLDG 6 Analyst: B. Maddux
Road Name: Eucalyptus Ave
Scenario: Third Floor With Wall
21,700
10%
84.0 NOISE MODEL INPUTS
Average Daily Traffic (Adt):
Peak Hour Percentage:
Peak Hour Volume: 2,170 vehicles
Centerline Dist. to Barrier:
Centerline Dist. to Observer: 104.0
Highway Data
feet
feet
vehicles
Road Elevation: 0.0
Barrier Elevation: 0.0
Pad Elevation: 0.0
Site Data
Site Conditions (Hard = 10, Soft = 15)
Medium Trucks (2 Axles): 15
Heavy Trucks (3+ Axles): 15
Autos: 15
Vehicle Mix
feet
feet Lane Equivalent Distance (in feet)
Barrier Height: 6.0
Observer Height (Above Pad): 23.0 feet
feet
Vehicle Speed: 40 mph
Near/Far Lane Distance: 40 feet
REMEL Traffic Flow Distance
1.93 VehicleType Day Evening Night Daily
Medium Trucks:
Heavy Trucks:
Autos: 77.5% 12.9% 9.6% 97.42%
84.8% 4.9% 10.3% 1.84%
86.5% 2.7% 10.8% 0.74%
-3.54
Finite Road
-1.20
Barrier Atten
FHWA Noise Model Calculations
Barrier Distance to Observer: 20.0 feet
Barrier Type (0-Wall, 1-Berm): 0.0
0.000 0.000
Fresnel Berm Atten
Medium Trucks:
Heavy Trucks:
Autos:
VehicleType
-15.31 -3.50 -1.20 0.000 0.000
-19.27 -3.40 -1.20 0.000 0.000
-3.36
-3.76
-4.85
Medium Trucks:
Heavy Trucks:
Autos:
Noise Source Elevations (in feet)
Medium Trucks:
Heavy Trucks:
Autos: 0.00
2.30 8.01
84.764
84.170
82.951
Grade Adjustment: 0.0
Unmitigated Noise Levels (without Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
64.5 62.6 60.9 54.8 63.4 64.1
56.3 57.3
54.8 48.4 46.9 55.4 55.6
55.9 46.8 48.1 56.4 56.6
Vehicle Noise: 65.8 64.0 61.3 56.2 64.8 65.3
Mitigated Noise Levels (with Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
64.5 62.6 60.9 54.8 63.4 64.1
56.3 57.3
54.8 48.4 46.9 55.4 55.6
55.9 46.8 48.1 56.4 56.6
Vehicle Noise: 65.8 64.0 61.3 56.2 64.8 65.3
76.31 81.16
67.36 Road Grade: 1.0%
feet
Wednesday, May 29, 2024
135
1839
FHWA-RD-77-108 HIGHWAY NOISE PREDICTION MODEL (CALVENO) - v10/31/19
SITE SPECIFIC INPUT DATA
Project Name: Esperanza Specific Plan
Job Number: 15662
Lot No: BLDG 5-6 Analyst: B. Maddux
Road Name: Clifton Ave
Scenario: Third Floor With Wall
9,500
10%
31.0 NOISE MODEL INPUTS
Average Daily Traffic (Adt):
Peak Hour Percentage:
Peak Hour Volume: 950 vehicles
Centerline Dist. to Barrier:
Centerline Dist. to Observer: 41.0
Highway Data
feet
feet
vehicles
Road Elevation: 0.0
Barrier Elevation: 0.0
Pad Elevation: 0.0
Site Data
Site Conditions (Hard = 10, Soft = 15)
Medium Trucks (2 Axles): 15
Heavy Trucks (3+ Axles): 15
Autos: 15
Vehicle Mix
feet
feet Lane Equivalent Distance (in feet)
Barrier Height: 0.0
Observer Height (Above Pad): 23.0 feet
feet
Vehicle Speed: 25 mph
Near/Far Lane Distance: 12 feet
REMEL Traffic Flow Distance
0.38 VehicleType Day Evening Night Daily
Medium Trucks:
Heavy Trucks:
Autos: 77.5% 12.9% 9.6% 97.42%
84.8% 4.9% 10.3% 1.84%
86.5% 2.7% 10.8% 0.74%
1.12 Finite Road
-1.20
Barrier Atten
FHWA Noise Model Calculations
Barrier Distance to Observer: 10.0 feet
Barrier Type (0-Wall, 1-Berm): 0.0
0.000 0.000
Fresnel Berm Atten
Medium Trucks:
Heavy Trucks:
Autos:
VehicleType
-16.86 1.31 -1.20 0.000 0.000
-20.82 1.75 -1.20 0.000 0.000
-8.02
-9.31
-12.97
Medium Trucks:
Heavy Trucks:
Autos:
Noise Source Elevations (in feet)
Medium Trucks:
Heavy Trucks:
Autos: 0.00
2.30 8.01
41.449
40.220
37.601
Grade Adjustment: 0.0
Unmitigated Noise Levels (without Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
59.7 57.8 56.1 50.0 58.6 59.2
54.3 57.0
52.8 46.5 44.9 53.4 53.6
55.6 46.5 47.8 56.1 56.3
Vehicle Noise: 62.3 60.6 56.9 52.8 61.3 61.7
Mitigated Noise Levels (with Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
59.7 57.8 56.1 50.0 58.6 59.2
54.3 57.0
52.8 46.5 44.9 53.4 53.6
55.6 46.5 47.8 56.1 56.3
Vehicle Noise: 62.3 60.6 56.9 52.8 61.3 61.7
71.09 77.24
59.44 Road Grade: 1.0%
feet
Wednesday, May 29, 2024
136
1840
FHWA-RD-77-108 HIGHWAY NOISE PREDICTION MODEL (CALVENO) - v10/31/19
SITE SPECIFIC INPUT DATA
Project Name: Esperanza Specific Plan
Job Number: 15662
Lot No: BLDG 4 Analyst: B. Maddux
Road Name: Clifton Ave
Scenario: Third Floor With Wall
9,500
10%
32.0 NOISE MODEL INPUTS
Average Daily Traffic (Adt):
Peak Hour Percentage:
Peak Hour Volume: 950 vehicles
Centerline Dist. to Barrier:
Centerline Dist. to Observer: 51.0
Highway Data
feet
feet
vehicles
Road Elevation: 0.0
Barrier Elevation: 0.0
Pad Elevation: 0.0
Site Data
Site Conditions (Hard = 10, Soft = 15)
Medium Trucks (2 Axles): 15
Heavy Trucks (3+ Axles): 15
Autos: 15
Vehicle Mix
feet
feet Lane Equivalent Distance (in feet)
Barrier Height: 0.0
Observer Height (Above Pad): 23.0 feet
feet
Vehicle Speed: 25 mph
Near/Far Lane Distance: 12 feet
REMEL Traffic Flow Distance
0.38 VehicleType Day Evening Night Daily
Medium Trucks:
Heavy Trucks:
Autos: 77.5% 12.9% 9.6% 97.42%
84.8% 4.9% 10.3% 1.84%
86.5% 2.7% 10.8% 0.74%
-0.13
Finite Road
-1.20
Barrier Atten
FHWA Noise Model Calculations
Barrier Distance to Observer: 19.0 feet
Barrier Type (0-Wall, 1-Berm): 0.0
0.000 0.000
Fresnel Berm Atten
Medium Trucks:
Heavy Trucks:
Autos:
VehicleType
-16.86 0.01 -1.20 0.000 0.000
-20.82 0.29 -1.20 0.000 0.000
-5.18
-6.26
-9.40
Medium Trucks:
Heavy Trucks:
Autos:
Noise Source Elevations (in feet)
Medium Trucks:
Heavy Trucks:
Autos: 0.00
2.30 8.01
50.180
49.169
47.051
Grade Adjustment: 0.0
Unmitigated Noise Levels (without Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
58.5 56.6 54.8 48.8 57.4 58.0
53.0 55.5
51.5 45.2 43.6 52.1 52.3
54.1 45.1 46.3 54.7 54.8
Vehicle Noise: 61.0 59.3 55.7 51.5 60.0 60.4
Mitigated Noise Levels (with Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
58.5 56.6 54.8 48.8 57.4 58.0
53.0 55.5
51.5 45.2 43.6 52.1 52.3
54.1 45.1 46.3 54.7 54.8
Vehicle Noise: 61.0 59.3 55.7 51.5 60.0 60.4
71.09 77.24
59.44 Road Grade: 1.0%
feet
Wednesday, May 29, 2024
137
1841
FHWA-RD-77-108 HIGHWAY NOISE PREDICTION MODEL (CALVENO) - v10/31/19
SITE SPECIFIC INPUT DATA
Project Name: Esperanza Specific Plan
Job Number: 15662
Lot No: BLDG 4 Analyst: B. Maddux
Road Name: Chatham St
Scenario: Third Floor With Wall
9,500
10%
25.0 NOISE MODEL INPUTS
Average Daily Traffic (Adt):
Peak Hour Percentage:
Peak Hour Volume: 950 vehicles
Centerline Dist. to Barrier:
Centerline Dist. to Observer: 33.0
Highway Data
feet
feet
vehicles
Road Elevation: 0.0
Barrier Elevation: 0.0
Pad Elevation: 0.0
Site Data
Site Conditions (Hard = 10, Soft = 15)
Medium Trucks (2 Axles): 15
Heavy Trucks (3+ Axles): 15
Autos: 15
Vehicle Mix
feet
feet Lane Equivalent Distance (in feet)
Barrier Height: 0.0
Observer Height (Above Pad): 23.0 feet
feet
Vehicle Speed: 25 mph
Near/Far Lane Distance: 12 feet
REMEL Traffic Flow Distance
0.38 VehicleType Day Evening Night Daily
Medium Trucks:
Heavy Trucks:
Autos: 77.5% 12.9% 9.6% 97.42%
84.8% 4.9% 10.3% 1.84%
86.5% 2.7% 10.8% 0.74%
2.23 Finite Road
-1.20
Barrier Atten
FHWA Noise Model Calculations
Barrier Distance to Observer: 8.0 feet
Barrier Type (0-Wall, 1-Berm): 0.0
0.000 0.000
Fresnel Berm Atten
Medium Trucks:
Heavy Trucks:
Autos:
VehicleType
-16.86 2.51 -1.20 0.000 0.000
-20.82 3.16 -1.20 0.000 0.000
-7.71
-9.26
-13.78
Medium Trucks:
Heavy Trucks:
Autos:
Noise Source Elevations (in feet)
Medium Trucks:
Heavy Trucks:
Autos: 0.00
2.30 8.01
34.957
33.491
30.296
Grade Adjustment: 0.0
Unmitigated Noise Levels (without Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
60.8 58.9 57.2 51.1 59.7 60.4
55.5 58.4
54.0 47.7 46.1 54.6 54.8
57.0 47.9 49.2 57.5 57.7
Vehicle Noise: 63.5 61.9 58.1 54.0 62.5 62.9
Mitigated Noise Levels (with Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
60.8 58.9 57.2 51.1 59.7 60.4
55.5 58.4
54.0 47.7 46.1 54.6 54.8
57.0 47.9 49.2 57.5 57.7
Vehicle Noise: 63.5 61.9 58.1 54.0 62.5 62.9
71.09 77.24
59.44 Road Grade: 1.0%
feet
Wednesday, May 29, 2024
138
1842
FHWA-RD-77-108 HIGHWAY NOISE PREDICTION MODEL (CALVENO) - v10/31/19
SITE SPECIFIC INPUT DATA
Project Name: Esperanza Specific Plan
Job Number: 15662
Lot No: BLDG 1-3 Analyst: B. Maddux
Road Name: Chatham St
Scenario: Third Floor With Wall
9,500
10%
25.0 NOISE MODEL INPUTS
Average Daily Traffic (Adt):
Peak Hour Percentage:
Peak Hour Volume: 950 vehicles
Centerline Dist. to Barrier:
Centerline Dist. to Observer: 35.0
Highway Data
feet
feet
vehicles
Road Elevation: 0.0
Barrier Elevation: 0.0
Pad Elevation: 0.0
Site Data
Site Conditions (Hard = 10, Soft = 15)
Medium Trucks (2 Axles): 15
Heavy Trucks (3+ Axles): 15
Autos: 15
Vehicle Mix
feet
feet Lane Equivalent Distance (in feet)
Barrier Height: 0.0
Observer Height (Above Pad): 23.0 feet
feet
Vehicle Speed: 25 mph
Near/Far Lane Distance: 12 feet
REMEL Traffic Flow Distance
0.38 VehicleType Day Evening Night Daily
Medium Trucks:
Heavy Trucks:
Autos: 77.5% 12.9% 9.6% 97.42%
84.8% 4.9% 10.3% 1.84%
86.5% 2.7% 10.8% 0.74%
1.94 Finite Road
-1.20
Barrier Atten
FHWA Noise Model Calculations
Barrier Distance to Observer: 10.0 feet
Barrier Type (0-Wall, 1-Berm): 0.0
0.000 0.000
Fresnel Berm Atten
Medium Trucks:
Heavy Trucks:
Autos:
VehicleType
-16.86 2.20 -1.20 0.000 0.000
-20.82 2.79 -1.20 0.000 0.000
-6.91
-8.40
-12.77
Medium Trucks:
Heavy Trucks:
Autos:
Noise Source Elevations (in feet)
Medium Trucks:
Heavy Trucks:
Autos: 0.00
2.30 8.01
36.524
35.123
32.091
Grade Adjustment: 0.0
Unmitigated Noise Levels (without Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
60.6 58.7 56.9 50.8 59.5 60.1
55.2 58.0
53.7 47.4 45.8 54.3 54.5
56.6 47.6 48.8 57.2 57.3
Vehicle Noise: 63.2 61.5 57.8 53.7 62.2 62.6
Mitigated Noise Levels (with Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
60.6 58.7 56.9 50.8 59.5 60.1
55.2 58.0
53.7 47.4 45.8 54.3 54.5
56.6 47.6 48.8 57.2 57.3
Vehicle Noise: 63.2 61.5 57.8 53.7 62.2 62.6
71.09 77.24
59.44 Road Grade: 1.0%
feet
Wednesday, May 29, 2024
139
1843
FHWA-RD-77-108 HIGHWAY NOISE PREDICTION MODEL (CALVENO) - v10/31/19
SITE SPECIFIC INPUT DATA
Project Name: Esperanza Specific Plan
Job Number: 15662
Lot No: BLDG 27-28 Analyst: B. Maddux
Road Name: Chatham St
Scenario: Third Floor With Wall
9,500
10%
25.0 NOISE MODEL INPUTS
Average Daily Traffic (Adt):
Peak Hour Percentage:
Peak Hour Volume: 950 vehicles
Centerline Dist. to Barrier:
Centerline Dist. to Observer: 43.0
Highway Data
feet
feet
vehicles
Road Elevation: 0.0
Barrier Elevation: 0.0
Pad Elevation: 0.0
Site Data
Site Conditions (Hard = 10, Soft = 15)
Medium Trucks (2 Axles): 15
Heavy Trucks (3+ Axles): 15
Autos: 15
Vehicle Mix
feet
feet Lane Equivalent Distance (in feet)
Barrier Height: 0.0
Observer Height (Above Pad): 23.0 feet
feet
Vehicle Speed: 25 mph
Near/Far Lane Distance: 12 feet
REMEL Traffic Flow Distance
0.38 VehicleType Day Evening Night Daily
Medium Trucks:
Heavy Trucks:
Autos: 77.5% 12.9% 9.6% 97.42%
84.8% 4.9% 10.3% 1.84%
86.5% 2.7% 10.8% 0.74%
0.86 Finite Road
-1.20
Barrier Atten
FHWA Noise Model Calculations
Barrier Distance to Observer: 18.0 feet
Barrier Type (0-Wall, 1-Berm): 0.0
0.000 0.000
Fresnel Berm Atten
Medium Trucks:
Heavy Trucks:
Autos:
VehicleType
-16.86 1.04 -1.20 0.000 0.000
-20.82 1.44 -1.20 0.000 0.000
-4.54
-5.82
-9.69
Medium Trucks:
Heavy Trucks:
Autos:
Noise Source Elevations (in feet)
Medium Trucks:
Heavy Trucks:
Autos: 0.00
2.30 8.01
43.151
41.972
39.469
Grade Adjustment: 0.0
Unmitigated Noise Levels (without Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
59.5 57.6 55.8 49.8 58.4 59.0
54.1 56.7
52.6 46.2 44.7 53.1 53.3
55.2 46.2 47.5 55.8 55.9
Vehicle Noise: 62.1 60.4 56.7 52.5 61.1 61.5
Mitigated Noise Levels (with Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
59.5 57.6 55.8 49.8 58.4 59.0
54.1 56.7
52.6 46.2 44.7 53.1 53.3
55.2 46.2 47.5 55.8 55.9
Vehicle Noise: 62.1 60.4 56.7 52.5 61.1 61.5
71.09 77.24
59.44 Road Grade: 1.0%
feet
Wednesday, May 29, 2024
140
1844
FHWA-RD-77-108 HIGHWAY NOISE PREDICTION MODEL (CALVENO) - v10/31/19
SITE SPECIFIC INPUT DATA
Project Name: Esperanza Specific Plan
Job Number: 15662
Lot No: BLDG 27 Analyst: B. Maddux
Road Name: Amherst Ave
Scenario: Third Floor With Wall
9,500
10%
30.0 NOISE MODEL INPUTS
Average Daily Traffic (Adt):
Peak Hour Percentage:
Peak Hour Volume: 950 vehicles
Centerline Dist. to Barrier:
Centerline Dist. to Observer: 40.0
Highway Data
feet
feet
vehicles
Road Elevation: 0.0
Barrier Elevation: 0.0
Pad Elevation: 0.0
Site Data
Site Conditions (Hard = 10, Soft = 15)
Medium Trucks (2 Axles): 15
Heavy Trucks (3+ Axles): 15
Autos: 15
Vehicle Mix
feet
feet Lane Equivalent Distance (in feet)
Barrier Height: 0.0
Observer Height (Above Pad): 23.0 feet
feet
Vehicle Speed: 25 mph
Near/Far Lane Distance: 12 feet
REMEL Traffic Flow Distance
0.38 VehicleType Day Evening Night Daily
Medium Trucks:
Heavy Trucks:
Autos: 77.5% 12.9% 9.6% 97.42%
84.8% 4.9% 10.3% 1.84%
86.5% 2.7% 10.8% 0.74%
1.25 Finite Road
-1.20
Barrier Atten
FHWA Noise Model Calculations
Barrier Distance to Observer: 10.0 feet
Barrier Type (0-Wall, 1-Berm): 0.0
0.000 0.000
Fresnel Berm Atten
Medium Trucks:
Heavy Trucks:
Autos:
VehicleType
-16.86 1.46 -1.20 0.000 0.000
-20.82 1.92 -1.20 0.000 0.000
-7.86
-9.18
-12.94
Medium Trucks:
Heavy Trucks:
Autos:
Noise Source Elevations (in feet)
Medium Trucks:
Heavy Trucks:
Autos: 0.00
2.30 8.01
40.608
39.352
36.672
Grade Adjustment: 0.0
Unmitigated Noise Levels (without Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
59.9 58.0 56.2 50.2 58.8 59.4
54.5 57.1
53.0 46.6 45.1 53.5 53.8
55.7 46.7 47.9 56.3 56.4
Vehicle Noise: 62.5 60.8 57.1 53.0 61.5 61.9
Mitigated Noise Levels (with Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
59.9 58.0 56.2 50.2 58.8 59.4
54.5 57.1
53.0 46.6 45.1 53.5 53.8
55.7 46.7 47.9 56.3 56.4
Vehicle Noise: 62.5 60.8 57.1 53.0 61.5 61.9
71.09 77.24
59.44 Road Grade: 1.0%
feet
Wednesday, May 29, 2024
141
1845
FHWA-RD-77-108 HIGHWAY NOISE PREDICTION MODEL (CALVENO) - v10/31/19
SITE SPECIFIC INPUT DATA
Project Name: Esperanza Specific Plan
Job Number: 15662
Lot No: BLDG 26-22 Analyst: B. Maddux
Road Name: Amherst Ave
Scenario: Third Floor With Wall
9,500
10%
30.0 NOISE MODEL INPUTS
Average Daily Traffic (Adt):
Peak Hour Percentage:
Peak Hour Volume: 950 vehicles
Centerline Dist. to Barrier:
Centerline Dist. to Observer: 40.0
Highway Data
feet
feet
vehicles
Road Elevation: 0.0
Barrier Elevation: 0.0
Pad Elevation: 0.0
Site Data
Site Conditions (Hard = 10, Soft = 15)
Medium Trucks (2 Axles): 15
Heavy Trucks (3+ Axles): 15
Autos: 15
Vehicle Mix
feet
feet Lane Equivalent Distance (in feet)
Barrier Height: 0.0
Observer Height (Above Pad): 23.0 feet
feet
Vehicle Speed: 25 mph
Near/Far Lane Distance: 12 feet
REMEL Traffic Flow Distance
0.38 VehicleType Day Evening Night Daily
Medium Trucks:
Heavy Trucks:
Autos: 77.5% 12.9% 9.6% 97.42%
84.8% 4.9% 10.3% 1.84%
86.5% 2.7% 10.8% 0.74%
1.25 Finite Road
-1.20
Barrier Atten
FHWA Noise Model Calculations
Barrier Distance to Observer: 10.0 feet
Barrier Type (0-Wall, 1-Berm): 0.0
0.000 0.000
Fresnel Berm Atten
Medium Trucks:
Heavy Trucks:
Autos:
VehicleType
-16.86 1.46 -1.20 0.000 0.000
-20.82 1.92 -1.20 0.000 0.000
-7.86
-9.18
-12.94
Medium Trucks:
Heavy Trucks:
Autos:
Noise Source Elevations (in feet)
Medium Trucks:
Heavy Trucks:
Autos: 0.00
2.30 8.01
40.608
39.352
36.672
Grade Adjustment: 0.0
Unmitigated Noise Levels (without Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
59.9 58.0 56.2 50.2 58.8 59.4
54.5 57.1
53.0 46.6 45.1 53.5 53.8
55.7 46.7 47.9 56.3 56.4
Vehicle Noise: 62.5 60.8 57.1 53.0 61.5 61.9
Mitigated Noise Levels (with Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
59.9 58.0 56.2 50.2 58.8 59.4
54.5 57.1
53.0 46.6 45.1 53.5 53.8
55.7 46.7 47.9 56.3 56.4
Vehicle Noise: 62.5 60.8 57.1 53.0 61.5 61.9
71.09 77.24
59.44 Road Grade: 0.0%
feet
Wednesday, May 29, 2024
142
1846
FHWA-RD-77-108 HIGHWAY NOISE PREDICTION MODEL (CALVENO) - v10/31/19
SITE SPECIFIC INPUT DATA
Project Name: Esperanza Specific Plan
Job Number: 15662
Lot No: BLDG 20-21 Analyst: B. Maddux
Road Name: Amherst Ave
Scenario: Third Floor With Wall
9,500
10%
30.0 NOISE MODEL INPUTS
Average Daily Traffic (Adt):
Peak Hour Percentage:
Peak Hour Volume: 950 vehicles
Centerline Dist. to Barrier:
Centerline Dist. to Observer: 40.0
Highway Data
feet
feet
vehicles
Road Elevation: 0.0
Barrier Elevation: 0.0
Pad Elevation: 0.0
Site Data
Site Conditions (Hard = 10, Soft = 15)
Medium Trucks (2 Axles): 15
Heavy Trucks (3+ Axles): 15
Autos: 15
Vehicle Mix
feet
feet Lane Equivalent Distance (in feet)
Barrier Height: 0.0
Observer Height (Above Pad): 23.0 feet
feet
Vehicle Speed: 25 mph
Near/Far Lane Distance: 12 feet
REMEL Traffic Flow Distance
0.38 VehicleType Day Evening Night Daily
Medium Trucks:
Heavy Trucks:
Autos: 77.5% 12.9% 9.6% 97.42%
84.8% 4.9% 10.3% 1.84%
86.5% 2.7% 10.8% 0.74%
1.25 Finite Road
-1.20
Barrier Atten
FHWA Noise Model Calculations
Barrier Distance to Observer: 10.0 feet
Barrier Type (0-Wall, 1-Berm): 0.0
0.000 0.000
Fresnel Berm Atten
Medium Trucks:
Heavy Trucks:
Autos:
VehicleType
-16.86 1.46 -1.20 0.000 0.000
-20.82 1.92 -1.20 0.000 0.000
-7.86
-9.18
-12.94
Medium Trucks:
Heavy Trucks:
Autos:
Noise Source Elevations (in feet)
Medium Trucks:
Heavy Trucks:
Autos: 0.00
2.30 8.01
40.608
39.352
36.672
Grade Adjustment: 0.0
Unmitigated Noise Levels (without Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
59.9 58.0 56.2 50.2 58.8 59.4
54.5 57.1
53.0 46.6 45.1 53.5 53.8
55.7 46.7 47.9 56.3 56.4
Vehicle Noise: 62.5 60.8 57.1 53.0 61.5 61.9
Mitigated Noise Levels (with Topo and barrier attenuation) Medium Trucks:
Heavy Trucks:
Autos:
VehicleType Leq Peak Hour Leq Day Leq Evening Leq Night Ldn CNEL
59.9 58.0 56.2 50.2 58.8 59.4
54.5 57.1
53.0 46.6 45.1 53.5 53.8
55.7 46.7 47.9 56.3 56.4
Vehicle Noise: 62.5 60.8 57.1 53.0 61.5 61.9
71.09 77.24
59.44 Road Grade: 0.0%
feet
Wednesday, May 29, 2024
143
1847
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
APPENDIX 10.1:
HVAC MANUFACTURES SPECIFICATIONS
144
1848
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
This page was intentionally left blank.
145
1849
Product Data
24ABC6
Comfortt16 Air Conditioner
with Puronr Refrigerant
1---1/2 to 5 Nominal Tons
the environmentally sound refrigerant
Carrier’s Air Conditioners with Puronr refrigerant provide a collection of features unmatched by any other family of equipment. The 24ABC has been designed utilizing Carrier’s Puron refrigerant. The environmentally sound refrigerant allows you to make a responsible decision in the protection of the earth’s ozone layer.
This product has been designed and manufactured to meet Energy Starr criteria for energy efficiency when matched with appropriate coil components. Refer to the combination ratings in the Product Data for system combinations that meet Energy Starr guidelines.
NOTE: Ratings contained in this document are subject to change at any time. Always refer to the AHRI directory
(www.ahridirectory.org) for the most up--to--date ratings information.
INDUSTRY LEADING
FEATURES / BENEFITS
Efficiency
S 14 -- 16.5 SEER/11.0-- 13.5 EER
S Microtube Technologyt refrigeration system
S Indoor air quality accessories available
Sound
S Sound level as low as 76 dBA
S Sound level as low as 74 dBA with accessory sound
blanket
Comfort
S System supports Edger Thermidistatt or standard
thermostat controls
Reliability
S Puronr refrigerant -- environmentally sound, won’t
deplete the ozone layer and low lifetime servce cost.
S Scroll compressor
S Internal pressure relief valve
S Internal thermal overload
S Filter drier
S Balanced refrigeration system for maximum reliability Durability
WeatherArmort protection package:
S Solid, durable sheet metal construction
S Dense wire coil guard standard
S Baked--on, complete outer coverage, powder paint
Applications
S Long--line -- up to 250 feet (76.20 m) total equivalent length, up to 200 feet (60.96 m) condenser above
evaporator, or up to 80 ft. (24.38 m) evaporator above
condenser (See Longline Guide for more information.)
S Low ambient (down to --20_F/--28.9_C)) with
accessory kit
146
1850
2 MODEL NUMBER NOMENCLATURE
1 2 3 4 5 6 7 8 9 10 11 12 13
N N A A A/N N N N A/N A/N A/N N N
24 A B C 6 36 A 0 0 3 0
Product
Series
Product
Family Tier Major
Series SEER Cooling
Capacity
Grille
Variations Open Open Voltage Series
24=AC A=RES AC B=Comfort C=Puron 6=16 SEER A = Dense
W = Standard
0=Not
Defined
0=Not
Defined
3=208/230 ---1 0=
Original
Series
the environmentally sound refrigerant
This product has been designed and manufactured to
meet Energy Star® criteria for energy efficiency when
matched with appropriate coil components. However,
proper refrigerant charge and proper air flow are critical to achieve rated capacity and efficiency. Installation of this product should follow all manufacturing refrigerant charging and air flow instructions. Failure to confirm
proper charge and air flow may reduce energy
efficiency and shorten equipment life.
Use of the AHRI Certified
TM Mark indicates a
manufacturer’s
participation in the
program For verification
of certification for individual
products, go to
www.ahridirectory.org.
STANDARD FEATURES
Feature 18 24 30 36 42 48 / 49 60 / 61
Puron Refrigerant X X X X X X X
Maximum SEER * 16.0 16.0 16.5 16.5 16.0 16.0 16.0
Scroll Compressor X X X X X X X
Field Installed Filter Drier X X X X X X X
Front Seating Service Valves X X X X X X X
Internal Pressure Relief Valve X X X X X X X
Internal Thermal Overload X X X X X X X
Long Line capability X X X X X X X
Low Ambient capability with Kit X X X X X X X
Dense Grille X X X X X X X
* With approved combinations
X = Standard
PHYSICAL DATA
UNIT SIZE ---VOLTAGE, SERIES 18 --- 31 24 --- 30 30 --- 30 36 --- 30 42 --- 30 48 --- 31 49 --- 30 60 --- 30 61 --- 30 Operating Weight lb (kg) 125
(56.7)
147
(66.5)
153
(69.3)
165
(74.8)
213
(96.4)
264
(119.7)
231
(104.8)
272
(123.4)
272
(123.4)
Shipping Weight lb (kg) 154
(69.9)
183
(82.8)
188
(85.2)
204
(92.5)
254
(115.2)
317
(143.8)
269
(222.0)
310
(140.6)
310
(140.6)
Compressor Type Scroll
REFRIGERANT Puron® (R ---410A)
Control TXV (Puron® Hard Shutoff)
Charge lb (kg) 4.60
(2.09)
6.00 (2.72)
6.81 (3.09)
7.00 (3.18)
8.62 (3.91)
13.0 (5.90)
9.00 (4.08)
14.50 (6.58)
14.50 (6.58)
COND FAN Propeller Type, Direct Drive
Air Discharge Vertical Vertical
Air Qty (CFM) 1881 2614 2614 3223 3810 4046 4046 4046 4046 Motor HP 1/12 1/10 1/10 1/12 1/5 1/4 1/4 1/4 1/4
Motor RPM 1100 1100 1100 800 800 800 800 800 800
COND COIL
Face Area (Sq ft) 11.50 15.10 17.20 17.60 25.15 25.15 25.15 30.15 30.15 Fins per In. 25 25 25 25 25 20 20 20 20
Rows 1 1 1 1 1 2 1 2 2
Circuits 3 4 4 4 6 7 7 8 8
VALVE CONNECT. (In. ID)
Vapor 3/4 3/4 3/4 7/8 7/8 7/8 7/8 7/8 7/8
Liquid 3/8 3/8 3/8 3/8 3/8 3/8 3/8 3/8 3/8
REFRIGERANT TUBES (In. OD)
Rated Vapor* 3/4 7/8 1 ---1/8
Max Liquid Line { 3/8
* Units are rated with 25 ft (7.6 m) of lineset length. See Vapor Line Sizing and Cooling Capacity Loss table when using other sizes and lengths of lineset.
Note: See unit Installation Instruction for proper installation. { See Liquid Line Sizing For Cooling Only Systems with Puron Refrigerant tables. 24ABC6
147
1851
3 REFRIGERANT PIPING LENGTH LIMITATIONS
Liquid Line Sizing and Maximum Total Equivalent Lengths{ for Cooling Only Systems with Puronr Refrigerant:
The maximum allowable length of a residential split system depends on the liquid line diameter and vertical separation between indoor and outdoor units.
See Table below for liquid line sizing and maximum lengths :
Maximum Total Equivalent Length
Outdoor Unit BELOW Indoor Unit
Size Liquid Line
Connection
Liquid
Line
Diam.
w/ TXV
AC with Puron Refrigerant Maximum Total Equivalent Length{: Outdoor unit BELOW Indoor Vertical Separation ft (m)
0---5
(0---1.5)
6---10
(1.8---3.0)
11---20
(3.4---6.1)
21---30
(6.4---9.1)
31---40
(9.4---12.2)
41---50
(12.5---15.2)
51---60
(15.5---18.3)
61---70
(18.6---21.3)
71---80
(21.6---24.4)
18000
AC with
Puron
3/8
1/4 150 150 125 100 100 75 --- --- --- --- --- ---
5/16 250* 250* 250* 250* 250* 250* 250* 225* 150
3/8 250* 250* 250* 250* 250* 250* 250* 250* 250*
24000
AC with
Puron
3/8
1/4 75 75 75 50 50 --- --- --- --- --- --- --- ---
5/16 250* 250* 250* 250* 250* 225* 175 125 100
3/8 250* 250* 250* 250* 250* 250* 250* 250* 250*
30000
AC with
Puron
3/8
1/4 30 --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- 5/16 175 225* 200 175 125 100 75 --- --- --- ---
3/8 250* 250* 250* 250* 250* 250* 250* 250* 250*
36000
AC with
Puron
3/8
5/16 175 150 150 100 100 100 75 --- --- --- ---
3//8 250* 250* 250* 250* 250* 250* 250* 250* 250*
42000
AC with
Puron
3/8
5/16 125 100 100 75 75 50 --- --- --- --- --- ---
3/8 250* 250* 250* 250* 250* 250* 250* 250* 150
48000
AC with
Puron
3/8 3/8 250* 250* 250* 250* 250* 250* 230 160 --- ---
49000
AC with
Puron
3/8 3/8 250* 250* 250* 250* 250* 250* 230 160 --- ---
60000
AC with
Puron
3/8 3/8 250* 250* 250* 225* 190 150 110 --- --- --- --- 61000
AC with
Puron
3/8 3/8 250* 250* 250* 225* 190 150 110 --- --- --- --- * Maximum actual length not to exceed 200 ft (61 m)
{ Total equivalent length accounts for losses due to elbows or fitting. See the Long Line Guideline for details. --- --- = outside acceptable range
Maximum Total Equivalent Length
Outdoor Unit ABOVE Indoor Unit
Size Liquid Line
Connection
Liquid
Line
Diam.
w/ TXV
AC with Puron Refrigerant Maximum Total Equivalent Length{: Outdoor unit ABOVE Indoor Vertical Separation ft (m)
25 (7.6)
26---50
(7.9---15.2)
51---75
(15.5---22.9)
76---100
(23.2---30.5)
101---125
(30.8---38.1)
126---150
(38.4---45.7)
151---175
(46.0---53.3)
176---200
(53.6---61.0)
18000
AC with
Puron
3/8
1/4 175 250* 250* 250* 250* 250* 250* 250*
5/16 250* 250* 250* 250* 250* 250* 250* 250*
3/8 250* 250* 250* 250* 250* 250* 250* 250*
24000
AC with
Puron
3/8
1/4 100 125 175 200 225* 250* 250* 250*
5/16 250* 250* 250* 250* 250* 250* 250* 250*
3/8 250* 250* 250* 250* 250* 250* 250* 250*
30000
AC with
Puron
3/8
1/4 30 --- --- --- --- --- --- --- --- --- --- --- --- --- --- 5/16 250* 250* 250* 250* 250* 250* 250* 250*
3/8 250* 250* 250* 250* 250* 250* 250* 250*
36000
AC with
Puron
3/8 5/16 225* 250* 250* 250* 250* 250* 250* 250*
3/8 250* 250* 250* 250* 250* 250* 250* 250*
42000
AC with
Puron
3/8
5/16 175 200 250* 250* 250* 250* 250* 250*
3/8 250* 250* 250* 250* 250* 250* 250* 250*
48000
AC with
Puron
3/8 3/8 250* 250* 250* 250* 250* 250* 250* 250*
49000
AC with
Puron
3/8 3/8 250* 250* 250* 250* 250* 250* 250* 250*
60000
AC with
Puron
3/8 3/8 250* 250* 250* 250* 250* 250* 250* 250*
61000
AC with
Puron
3/8 3/8 250* 250* 250* 250* 250* 250* 250* 250*
* Maximum actual length not to exceed 200 ft (61 m)
{ Total equivalent length accounts for losses due to elbows or fitting. See the Long Line Guideline for details. --- --- = outside acceptable range
24ABC6
148
1852
4 REFRIGERANT CHARGE ADJUSTMENTS
Liquid Line Size Puron Charge oz/ft
3/8 0.60
(Factory charge for lineset = 9 oz)
5/16 0.40
1/4 0.27
Units are factory charged for 15 ft (4.6 m) of 3/8” liquid line. The factory charge for 3/8” lineset 9 oz. When using other length or diameter liquid lines, charge adjustments are required per the chart above.
Charging Formula:
[(Lineset oz/ft x total length) – (factory charge for lineset)] = charge adjustment Example 1: System has 15 ft of line set using existing 1/4“ liquid line. What charge adjustment is required? Formula: (.27 oz/ft x 15ft) – (9 oz) = (-4.95) oz.
Net result is to remove 4.95 oz of refrigerant from the system Example 2: System has 45 ft of existing 5/16” liquid line. What is the charge adjustment? Formula: (.40 oz/ft. x 45ft) – (9 oz.) = 9 oz.
Net result is to add 9 oz of refrigerant to the system
LONG LINE APPLICATIONS
An application is considered Long Line, when the refrigerant level in the system requires the use of accessories to maintain acceptable refrigerant management for systems reliability. See Accessory Usage Guideline table for required accessories. Defining a system as long line depends on the liquid line diameter, actual length of the tubing, and vertical separation between the indoor and outdoor units.
For Air Conditioner systems, the chart below shows when an application is considered Long Line.
AC WITH PURONr REFRIGERANT LONG LINE DESCRIPTION ft (m) Beyond these lengths, long line accessories are required Liquid Line Size Units On Same Level Outdoor Below Indoor Outdoor Above Indoor 1/4 No accessories needed within allowed
lengths
No accessories needed within allowed
lengths 175 (53.3)
5/16 120 (36.6) 50 (15.2) 120 (36.6)
3/8 80 (24.4) 35 (10.7) 80 (24.4)
Note: See Long Line Guideline for details
VAPOR LINE SIZING AND COOLING CAPACITY LOSS
Acceptable vapor line diameters provide adequate oil return to the compressor while avoiding excessive capacity loss. The suction line diameters shown in the chart below are acceptable for AC systems with Puron refrigerant:
Unit
Nominal
Size (Btuh)
Maximum
Liquid Line
Diameters
(In. OD)
Vapor Line
Diameters
(In. OD)
Cooling Capacity Loss (%)
Total Equivalent Line Length ft. (m)
26 --- 50
(7.9---15.2)
51 --- 80
(15.5---24.4)
81 --- 100
(24.7---30.5)
101 --- 125
(30.8---38.1)
126 --- 150
(38.4---45.7)
151 --- 175
(46.0---53.3)
176 --- 200
(53.6---61.0)
201 --- 225
(61.3---68.6)
226 --- 250
(68.9---76.2)
18000
1 Stage
AC with
Puron
3/8
1/2 1 2 3 5 6 7 8 9 11
5/8 0 1 1 1 2 2 2 3 3
3/4 0 0 0 0 1 1 1 1 1
24000
1 Stage
AC with
Puron
3/8
5/8 0 1 2 2 3 3 4 5 5
3/4 0 0 1 1 1 1 1 2 2
7/8 0 0 0 0 0 1 1 1 1
30000
1 Stage
AC with
Puron
3/8
5/8 1 2 3 3 4 5 6 7 8
3/4 0 0 1 1 1 2 2 2 3
7/8 0 0 0 0 1 1 1 1 1
36000
1 Stage
AC with
Puron
3/8
5/8 1 2 4 5 6 8 9 10 12
3/4 0 1 1 2 2 3 3 4 4
7/8 0 0 0 1 1 1 1 2 2
42000
1 Stage
AC with
Puron
3/8
3/4 0 1 2 2 3 4 4 5 6
7/8 0 0 1 1 1 2 2 2 3
1 1/8 0 0 0 0 0 0 0 0 0
48000,
49000
1 Stage
AC with
Puron
3/8
3/4 0 1 2 3 4 5 5 6 7
7/8 0 0 1 1 2 2 2 3 3
1 1/8 0 0 0 0 0 0 0 1 1
60000,
61000
1 Stage
AC with
Puron
3/8
3/4 1 2 4 5 6 7 9 10 11
7/8 0 1 2 2 3 4 4 5 5
1 1/8 0 0 0 1 1 1 1 1 1
Applications in this area may be long line and may have height restrictions. See the Residential Piping and Long Line Guideline. 24ABC6
149
1853
5 ACCESSORY THERMOSTATS
PART NUMBER PROGRAM GAS ELECTRIC HEAT PUMP HEAT COOL
Comfort
TC ---PAC01 5 --- 2 Day √ √ 1 1
TC ---NAC01 NP √ √ 1 1
TCSNAC01 NP √ √ 1 1
THERMOSTAT ACCESSORIES
PART NUMBER DESCRIPTION THERMOSTATS USED WITH
TSTATXXCNV10‡ Thermostat Conversion Kit (4 to 5 wire) --- 10 pack All Carrier branded thermostats TX --- LBP01 Large Decorative Backplate TP ---Pxx, TP ---Nxx, TC ---Pxx TX ---MBP01 Medium Decorative Backplate TC ---Nxx, TB ---Pxx
ACCESSORIES
KIT NUMBER DESCRIPTION
Unit Sizes --- Series
18 --- 31 24 --- 30 30 --- 30 36 --- 30 42 --- 30 48 --- 31 49 --- 30 60 --- 30 61 --- 30 KAAFT0101AAA FREEZE THERMOSTAT X X X X X X X X X
KAATD0101TDR TIME DELAY RELAY X X X X X X X X X
KSALA0301410 LOW AMBIENT PSW X X X X X X X X X
KSALA0601AAA{ MOTORMASTER 230V X X X X X X X X X
HC32GE234 MOTOR FAN BALL BEARING X
HC34GE240 MOTOR FAN BALL BEARING X X
HC32GE229 MOTOR FAN BALL BEARING X
HC38GE228 MOTOR FAN BALL BEARING X
HC40GE228 MOTOR FAN BALL BEARING X X X X
KSAHS1701AAA HARD START (CAP / RELAY) X X X X X X X X X KSACY0101AAA CYCLE PROTECTOR X X X X X X X X X
KSASF0101AAA SUPPORT FEET X X X X X X X X X
KAACS0201PTC START ASSIST PTC X X X X X X X X X
KAALS0201LLS LIQUID LINE SOLENOID X X X X X X X X X
KAAWS0101AAA WINTER START X X X X X X X X X
KAACH1701AAA CRANKCASE HTR X X X X
KAACH1601AAA CRANKCASE HTR X S S S S
KSATX0201PUR TXV PURON HSO X X X
KSATX0301PUR TXV PURON HSO X
KSATX0401PUR TXV PURON HSO X X
KSATX0501PUR TXV PURON HSO X X X
KSASH0601COP SOUND HOOD X X X X X
KSASH2101COP SOUND HOOD X X X X
KAALP0401PUR LOW PRESSURE SWITCH X X X X X X X X X
KAAHI0501PUR HIGH PRESSURE SWITCH X X X X X X X X X
{ Required accessories include ball bearing fan motor, compressor start assist (CAP / Relay), crankcase heater, evaporator freeze stat, hard shut ---off TXV.
X = Accessory / S --- Standard
24ABC6
150
1854
6 ACCESSORY USAGE GUIDELINE
ACCESSORY
REQUIRED FOR LOW ---AMBIENT COOLING APPLICATIONS
(Below 55°F/12.8_C)
REQUIRED FOR LONG
LINE
APPLICATIONS*
(Over 80 ft./24.38 m)
REQUIRED FOR
SEA COAST
APPLICATIONS
(Within 2 miles/3.22 km)
Ball Bearing Fan Motor Yes{ No No
Compressor Start Assist Capacitor and Relay Yes Yes No
Crankcase Heater Yes Yes No
Evaporator Freeze Thermostat Yes No No
Hard Shut---Off TXV Yes Yes Yes
Liquid Line Solenoid Valve No No No
Motor Master® Control or
Low---ambient Pressure Switch Yes No No
Support Feet Recommended No Recommended
Winter Start Control Yes No No
* For tubing line sets between 80 and 200 ft. (24.38 and 60.96 m) and/or 20 ft. (6.09 m) vertical differential, refer to Residential Split ---System Longline Application Guideline.
{ Required for Low ---Ambient Controller (full modulation feature) MotorMasterr Control.
Accessory Description and Usage (Listed Alphabetically)
1. Ball--Bearing Fan Motor
A fan motor with ball bearings which permits speed reduction while maintaining bearing lubrication.
Usage Guideline:
Required on all units when MotorMasterr is used.
2. Compressor Start Assist -- Capacitor and Relay
Start capacitor and relay gives a ”hard” boost to compressor motor at each start up.
Usage Guideline:
Required for reciprocating compressors in the
following applications:
Long line
Low ambient cooling
Hard shut off expansion valve on indoor coil
Liquid line solenoid on indoor coil
Required for single--phase scroll compressors in the
following applications:
Long line
Low ambient cooling
Suggested for all compressors in areas with a history of low voltage problems.
3. Compressor Start Assist — PTC Type
Solid state electrical device which gives a ”soft” boost to the compressor at each start--up.
Usage Guideline:
Suggested in installations with marginal power supply.
4. Crankcase Heater
An electric resistance heater which mounts to the base of the compressor to keep the lubricant warm during off cycles.
Improves compressor lubrication on restart and minimizes the chance of liquid slugging.
Usage Guideline:
Required in low ambient cooling applications.
Required in long line applications.
Suggested in all commercial applications.
5. Cycle Protector
The cycle protector is designed to prevent compressor short cycling. This control provides an approximate 5--minute delay after power to the compressor has been interrupted for any reason, including power outage, protector control trip, thermostat jiggling, or normal cycling.
6. Evaporator Freeze Thermostat
An SPST temperature--actuated switch that stops unit operation when evaporator reaches freeze--up conditions.
Usage Guideline:
Required when low ambient kit has been added.
7. Low--Ambient Pressure Switch Kit
A long life pressure switch which is mounted to outdoor unit service valve. It is designed to cycle the outdoor fan motor in order to maintain head pressure within normal operating limits (approximately 100 psig to 225 psig). The control will maintain working head pressure at low--ambient temperatures down to 0_F (--18_C) when properly installed.
Usage Guideline:
A Low--Ambient Pressure Switch or MotorMasterr
Low--Ambient Controller must be used when cooling operation is used at outdoor temperatures below 55_F (12.8_C).
8. MotorMasterr Low--Ambient Controller
A fan--speed control device activated by a temperature sensor, designed to control condenser fan motor speed in response to the saturated, condensing temperature during operation in cooling mode only. For outdoor temperatures down to --20_F (--28.9_C), it maintains condensing temperature at 100_F ±10_F (37.8_C ±
5.5_C).
Usage Guideline:
A MotorMasterr Low Ambient Controller or
Low--Ambient Pressure Switch must be used when
cooling operation is used at outdoor temperatures
below 55_F (12.8_C).
Suggested for all commercial applications.
9. Outdoor Air Temperature Sensor
Designed for use with Carrier Thermostats listed in this publication. This device enables the thermostat to display the outdoor temperature. This device also
is required to enable special thermostat features such as auxiliary heat lock out.
Usage Guideline:
Suggested for all Carrier thermostats listed in this
publication.
24ABC6
151
1855
7 Accessory Description and Usage (Listed Alphabetically) (Continued)
10. Sound Hood
Wraparound sound reducing cover for the compressor. Reduces the sound level by about 2 dBA.
Usage Guideline:
Suggested when unit is installed closer than 15 ft (4.57 m) to quiet areas, bedrooms, etc.
Suggested when unit is installed between two houses less than 10 ft (3.05 m) apart.
11. Support Feet
Four stick--on plastic feet that raise the unit 4 in. (101.6 mm) above the mounting pad. This allows sand, dirt, and other debris to be flushed from the unit base, minimizing corrosion.
Usage Guideline:
Suggested in the following applications:
Coastal installations.
Windy areas or where debris is normally circulating.
Rooftop installations.
For improved sound ratings.
12. Thermostatic Expansion Valve (TXV)
A modulating flow--control valve which meters refrigerant liquid flow rate into the evaporator in response to the superheat of the refrigerant gas leaving the evaporator.
Kit includes valve, adapter tubes, and external equalizer tube.
Hard shut off types are available.
NOTE: When using a hard shut off TXV with single phase
reciprocating compressors, a Compressor Start Assist Capacitor and Relay is required.
Usage Guideline:
Required to achieve AHRI ratings in certain equipment
combinations. Refer to combination ratings.
Hard shut off TXV or LLS required in air conditioner
long line applications.
Required for use on all zoning systems.
13. Time--Delay Relay
An SPST delay relay which briefly continues operation of indoor blower motor to provide additional cooling after the compressor cycles off.
NOTE: Most indoor unit controls include this feature. For those that do not, use the guideline below.
Usage Guideline:
For improved efficiency ratings for certain
combinations of indoor and outdoor units. Refer to
AHRI Unitary Directory.
14. Winter Start Control
This control is designed to alleviate nuisance opening of the low--pressure switch by bypassing it for the first 3 minutes of operation.
24ABC6
152
1856
8 ELECTRICAL DATA
UNIT SIZE V/PH
OPER VOLTS* COMPR FAN
MCA
MIN WIRE
SIZE{
60° C
MIN WIRE
SIZE{
75° C
MAX
LENGTH
ft. (m)}
60° C
MAX
LENGTH
ft. (m)}
75° C
MAX FUSE**
or CKT BRK
MAX MIN LRA RLA FLA AMPS
18 --- 31
208/230/1 ---60 253 197
48.0 9.0 0.50 11.8 14 14 67 (20.4) 64 (19.5) 20
24 --- 30 58.3 13.5 0.75 17.7 14 14 46 (14.0) 43 (13..1) 25 30 --- 30 64.0 12.8 0.75 16.8 14 14 44 (13.4) 41 (12.5) 25 36 --- 30 77.0 14.1 0.50 18.1 12 12 57 (17.4) 54 (16.5) 30 42 --- 30 112.0 17.9 1.20 23.6 10 10 85 (25.9) 81 (24.7) 40 48 --- 31 109.0 19.9 1.20 26.1 10 10 70 (21.3) 67 (20.4) 40 49 --- 30 117.0 21.8 1.20 26.1 10 10 70 (21.3) 67 (20.4) 40 60 --- 30 135.0 21.4 1.20 28.0 8 10 91 (27.7) 56 (17.1) 40 61 --- 30 134.0 25.0 1.20 32.5 8 10 94 (28.7) 58 (17.7) 50 * Permissible limits of the voltage range at which the unit will operate satisfactorily { If wire is applied at ambient greater than 30_C, consult table 310 ---16 of the NEC (NFPA 70). The ampacity of non ---metallic ---sheathed cable (NM), trade name ROMEX, shall be that of 60_C conditions, per the NEC (NFPA 70) Article 334 ---80. If other than uncoated (no ---plated), 60 or 75_C insulation, copper wire (solid wire for 10 AWG or smaller, stranded wire for larger than 10 AWG) is used, consult applicable tables of the NEC (NFPA 70). } Length shown is as measured one way along wire path between unit and service panel for voltage drop not to exceed 2%. ** Time ---Delay fuse.
FLA --- Full Load Amps
LRA --- Locked Rotor Amps
MCA --- Minimum Circuit Amps
RLA --- Rated Load Amps
NOTE: Control circuit is 24 ---V on all units and requires external power source. Copper wire must be used from service disconnect to unit.
All motors/compressors contain internal overload protection.
Complies with 2007 requirements of ASHRAE Standards 90.1 A--WEIGHTED SOUND POWER LEVEL (dBA)
Unit Size ---
Voltage, Series
Standard
Rating (dBA)
TYPICAL OCTAVE BAND SPECTRUM (dBA without tone adjustment) 125 250 500 1000 2000 4000 8000
018 --- 31 76 52.5 59.0 65.5 70.5 64.5 59.0 54.5
024 --- 30 76 57.5 64.0 69.0 71.0 69.0 64.5 60.0
030 --- 30 76 55.0 63.5 68.0 69.5 67.0 63.5 58.5
036 --- 30 76 50.5 59.5 64.5 70.5 62.0 59.5 54.5
042 --- 30 78 52.5 62.0 66.0 73.5 68.0 62.0 55.5
048 --- 31 78 57.5 61.5 66.0 70.5 65.5 59.5 53.5
049 --- 30 78 51.5 62.0 67.5 73.5 69.0 64.5 62.0
060 --- 30 78 55.0 62.5 67.5 70.5 65.0 61.0 53.5
061 --- 30 78 56.5 63.0 65.5 69.0 67.0 61.5 56.0
NOTE: Tested in accordance with AHRI Standard 270 ---08 (not listed in AHRI).
A--WEIGHTED SOUND POWER LEVEL (dBA) WITH SOUND SHIELD
Unit Size ---
Voltage, Series
Standard
Rating (dBA)
TYPICAL OCTAVE BAND SPECTRUM (dBA without tone adjustment) 125 250 500 1000 2000 4000 8000
018 --- 31 74 55.5 59.0 65.0 68.5 63.5 58.0 52.0
024 --- 30 75 58.0 64.0 69.0 70.5 68.5 64.5 59.5
030 --- 30 75 55.5 63.0 68.0 69.0 67.0 63.0 58.5
036 --- 30 74 51.5 58.5 62.0 65.0 61.0 58.0 52.0
042 --- 30 76 53.0 62.0 65.5 72.0 65.0 61.0 54.0
048 --- 31 76 58.5 61.5 66.0 69.0 64.0 58.5 51.0
049 --- 30 76 53.0 61.5 67.5 72.0 68.0 61.5 59.0
060 --- 30 75 56.5 62.5 66.5 68.0 63.0 59.5 51.5
061 --- 30 75 57.0 63.0 65.5 67.0 65.5 59.0 52.5
NOTE: Tested in accordance with AHRI Standard 270 ---08 (not listed in AHRI).
CHARGING SUBCOOLING (TXV--TYPE EXPANSION DEVICE)
UNIT SIZE ---VOLTAGE, SERIES REQUIRED SUBCOOLING _F(_C) 18 --- 31 10 (5.6)
24 --- 30 10 (5.6)
30 --- 30 10 (5.6)
36 --- 30 10 (5.6)
42 --- 30 9 (5.0)
48 --- 31 10 (5.6)
49 --- 30 8 (4.4)
60 --- 30 9 (5.0)
61 --- 30 9 (5.0)
24ABC6
153
1857
9 DIMENSIONS -- ENGLISH
B
3"
K
5/16"
L
C 3 1/2"
1 7/8"
N
P
M
E
F
G
A 208-230-1-60
230-1-60
208/230-3-60
460-3-60
UNIT SERIES ELECTRICAL CHARACTERISTICS A B CD E F G K L M N P OPERATING WEIGHT (lbs) SHIPPING WEIGHT (lbs) SHIPPING DIMENSIONS (L x W x H) 24ABC618 0 X O O O 23 1/8" 28 11/16" 3 3/4" 3/4" 4 7/16" 18 1/16" 7 13/16" 2 13/16" 1/2" 13" 12" 13" 118 141 24 1/4" X 27 3/8" X 32 9/16" 24ABC624 0 X O O O 31 3/16" 28 5/16" 3 3/4" 3/4" 6 9/16" 24 11/16" 9 1/8" 2 13/16" 1/2" 16" 16" 13" 147 183 32 3/8" X 35 1/2" X 32 9/16" 24ABC630 0 X O O O 31 3/16" 32 5/16" 3 3/4" 3/4" 6 9/16" 24 11/16" 9 1/8" 2 13/16" 1/2" 15 1/2" 16" 14 1/4" 153 188 32 3/8" X 35 1/2" X 35 15/16" 24ABC636 0 X O O O 35" 28 5/16" 3 7/8" 7/8" 6 9/16" 28 7/16" 9 1/8" 2 15/16" 5/8" 16" 16" 13" 165 204 36 1/8" X 39 5/16" X 32 9/16" 24ABC642 0 X O O O 35" 39 1/8" 3 7/8" 7/8" 6 9/16" 28 7/16" 9 1/8" 2 15/16" 5/8" 16 1/2" 17 1/2" 17 1/2" 213 254 36 1/8" X 39 5/16" X 42 3/4" 24ABC648 0 X O O O 35" 32 5/16" 3 7/8" 7/8" 6 9/16" 28 7/16" 9 1/8" 2 15/16" 5/8" 17" 17 1/2" 14 1/4" 231 274 36 1/8" X 39 5/16" X 35 15/16" 24ABC660 0 X O O O 35" 45 15/16" 3 7/8" 7/8" 6 9/16" 28 7/16" 9 1/8" 2 15/16" 5/8" 16 1/2" 17" 16 1/4" 272 310 36 1/8" X 39 5/16" X 49 9/16" 24ABC618 1 X O O O 25 3/4" 28 11/16" 3 3/4" 3/4" 4 7/16" 21 1/4" 7 13/16" 2 13/16" 1/2" 13 5/8" 13 1/2" 12 3/4" 125 154 26 7/8" X 30 1/16" X 32 9/16" 24ABC661 0 X O O O 35" 45 15/16" 3 7/8" 7/8" 6 9/16" 28 7/16" 9 1/8" 2 15/16" 5/8" 16 1/2" 17" 16 1/4" 272 310 36 1/8" X 39 5/16" X 49 9/16" 24ABC648 1 X O O O 35" 39 1/8" 3 7/8" 7/8" 6 9/16" 28 7/16" 9 1/8" 2 15/16" 5/8" 17 1/2" 16 1/2" 15" 264 317 36 1/8" X 39 5/16" X 42 3/4" 24ABC649 0 X O O O 35" 39 1/8" 3 7/8" 7/8" 6 9/16" 28 7/16" 9 1/8" 2 15/16" 5/8" 17 1/2" 16 1/2" 15" 231 269 36 1/8" X 39 5/16" X 42 3/4"
UNIT SIZE
MINIMUM
MOUNTING PAD
DIMENSIONS
18 26" X 26"
24,30 31 1/2" X 31 1/2"
36, 48, 49, 60, 61 35" X 35"
AIR DISCHARGE
SQ. AIR
DISCHARGE AIR IN
VAPOR LINE CONN. D
3/8"
LIQUID LINE CONN.
AIR IN
AIR IN
AIR IN
3/8" TIEDOWN KNOCKOUTS
(2) PLACES
FIELD CONTROL
SUPPLY CONN.
7/8" HOLE
FIELD POWER SUPPLY CONN.
7/8" HOLE WITH1 1/8" KNOCKOUT
X = YESO = NO
24ABC6
154
1858
10 DIMENSIONS -- SI
B
76.2 K
8.0 L
C 88.9
47.6 N
P
M
E
F
G
A
208-230-1-60
230-1-60
208/230-3-60
460-3-60
UNIT SERIES ELECTRICAL CHARACTERISTICS A B CD E F G K L M N P OPERATING WEIGHT (Kgs) SHIPPING WEIGHT (Kgs) SHIPPING DIMENSIONS (L x W x H) 24ABC618 0 X O O O 587.3 728.7 95.2 19.0 112.7 458.8 198.4 71.4 12.7 330.2 304.8 330.2 53.4 64.0 616.0 X 695.3 X 827.1 24ABC624 0 X O O O 792.2 719.2 95.2 19.0 166.7 627.1 231.8 71.4 12.7 406.4 406.4 330.2 66.5 82.8 822.3 X 901.7 X 827.1 24ABC630 0 X O O O 792.2 820.8 95.2 19.0 166.7 627.1 231.8 71.4 12.7 393.7 406.4 362.0 69.3 85.2 822.3 X 901.7 X 912.8 24ABC636 0 X O O O 889.0 719.2 98.6 22.2 166.7 722.3 231.8 74.6 15.9 406.4 406.4 330.2 74.8 92.5 917.6 X 998.6 X 827.1 24ABC642 0 X O O O 889.0 993.8 98.6 22.2 166.7 722.3 231.8 74.6 15.9 419.1 444.5 444.5 96.4 115.2 917.6 X 998.6 X 1085.8 24ABC648 0 X O O O 889.0 820.8 98.6 22.2 166.7 722.3 231.8 74.6 15.9 431.8 444.5 362.0 104.8 124.3 917.6 X 998.6 X 912.8 24ABC660 0 X O O O 889.0 1166.8 98.6 22.2 166.7 722.3 231.8 74.6 15.9 419.1 431.8 412.8 123.4 140.6 917.6 X 998.6 X 1258.9 24ABC618 1 X O O O 654.0 728.7 95.2 19.0 112.7 539.8 198.4 71.4 12.7 346.1 342.9 323.9 56.7 69.9 682.6 X 763.6 X 827.1 24ABC661 0 X O O O 889.0 1166.8 98.6 22.2 166.7 722.3 231.8 74.6 15.9 419.1 431.8 412.8 123.4 140.6 917.6 X 998.6 X 1258.9 24ABC648 1 X O O O 889.0 993.8 98.6 22.2 166.7 722.3 231.8 74.6 15.9 444.5 419.1 381.0 119.7 143.8 917.6 X 998.6 X 1085.8 24ABC649 0 X O O O 889.0 993.8 98.6 22.2 166.7 722.3 231.8 74.6 15.9 444.5 419.1 381.0 104.8 122.0 917.6 X 998.6 X 1085.8
UNIT SIZE
MINIMUM
MOUNTING PAD
DIMENSIONS
18 660.4 X 660.4
24,30 800.1 X 800.1
36, 48, 49, 60, 61 889.0 X 889.0
AIRDISCHARGE
AIR DISCHARGE
SQ.
AIR IN
VAPOR LINE CONN. D
9.53 LIQUID LINE CONN.
AIR IN
AIR IN
AIR IN
9.53 TIEDOWN KNOCKOUTS
(2) PLACES
FIELD CONTROL
SUPPLY CONN.
22.23 HOLE
FIELD POWER SUPPLY CONN.
22.23 HOLE WITH
28.58 KNOCKOUT
X = YESO = NO
24ABC6
155
1859
11 CLEARANCES
Clearances (various examples)
Wall
6”
(152.4)
24”
(609.6)
Service
Wall
Wall
Wall
12”
(304.8)
12”
(304.8)
18”
(457.2)
24”
(609.6)
Service
6”
(152.4)
12”
(304.8)
24”
(609.6)
Service
24”
(609.6)
Service
24”
(609.6)
Service
Note: Numbers in ( ) = mm
18”
(457.2)
18”
(457.2)
12”
(304.8)
IMPORTANT: When installing multiple units in an alcove, roof well, or partially enclosed area, ensure there is adequate ventilation to prevent re--circulation of discharge air. 24ABC6
156
1860
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
APPENDIX 10.2:
CADNAAOPERATION NOISE MODEL INPUTS
157
1861
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
This page was intentionally left blank.
158
1862
15662 - Ontario Esperanza PA-11
CadnaA Noise Prediction Model: 15662-05_Operation.cna
Date: 24.04.25
Analyst: B. Maddux
Calculation Configuration
Configuration
Parameter Value
General
Max. Error (dB) 0.00
Max. Search Radius (ft) 6561.70
Min. Dist Src to Rcvr 0.00
Partition
Raster Factor 0.50
Max. Length of Section (ft) 3280.80
Min. Length of Section (ft) 3.30
Min. Length of Section (%) 0.00
Proj. Line Sources On
Proj. Area Sources On
Ref. Time
Daytime Penalty (dB) 0.00
Recr. Time Penalty (dB) 5.00
Night-time Penalty (dB) 10.00
DTM
Standard Height (m) 0.00
Model of Terrain Triangulation
Reflection
max. Order of Reflection 2
Search Radius Src 328.08
Search Radius Rcvr 328.08
Max. Distance Source - Rcvr 3280.84 3280.84
Min. Distance Rvcr - Reflector 3.28 3.28
Min. Distance Source - Reflector 0.33
Industrial (ISO 9613 (1996))
Lateral Diffraction some Obj
Obst. within Area Src do not shield On
Screening Incl. Ground Att. over Barrier
Dz with limit (20/25)
Barrier Coefficients C1,2,3 3.0 20.0 0.0
Temperature (°F) 50
rel. Humidity (%) 70
Ground Absorption G 0.50
Wind Speed for Dir. (mph) 6.7
Roads (TNM)
Railways (FTA/FRA)
Aircraft (???)
Strictly acc. to AzB
Receiver Noise Levels
Name M. ID Level Lr Limit. Value Land Use Height Coordinates Day Night CNEL Day Night CNEL Type Auto Noise Type X Y Z (dBA) (dBA) (dBA) (dBA) (dBA) (dBA) (ft) (ft) (ft) (ft) R1 R1 46.4 44.1 50.7 0.0 0.0 0.0 x Total 5.00 r 6164064.26 2307541.04 5.00 R2 R2 38.3 35.9 42.6 0.0 0.0 0.0 x Total 5.00 r 6163933.45 2307702.79 5.00 R3 R3 40.3 37.8 44.5 0.0 0.0 0.0 x Total 5.00 r 6163414.11 2307485.36 5.00 R4 R4 43.8 41.4 48.0 0.0 0.0 0.0 x Total 5.00 r 6163268.40 2307065.85 5.00 R5 R5 39.3 36.9 43.5 0.0 0.0 0.0 x Total 5.00 r 6163701.04 2306426.26 5.00 R6 R6 38.3 35.8 42.5 0.0 0.0 0.0 x Total 5.00 r 6164053.38 2306904.23 5.00 Point Source(s)
Name M. ID Result. PWL Lw / Li Operating Time Height Coordinates Day Evening Night Type Value norm. Day Special Night X Y Z (dBA) (dBA) (dBA) dB(A) (min) (min) (min) (ft) (ft) (ft) (ft) AC001 AC001 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163563.62 2307448.24 3.00 AC002 AC002 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163577.17 2307419.34 3.00 AC003 AC003 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163584.98 2307404.23 3.00 AC004 AC004 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163594.09 2307384.44 3.00 AC005 AC005 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163603.21 2307364.91 3.00 AC006 AC006 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163613.10 2307344.34 3.00 AC007 AC007 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163660.76 2307490.95 3.00 AC008 AC008 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163710.24 2307387.05 3.00 AC009 AC009 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163674.30 2307462.05 3.00 AC010 AC010 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163682.11 2307446.94 3.00 AC011 AC011 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163700.34 2307407.62 3.00 AC012 AC012 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163691.23 2307427.15 3.00 AC013 AC013 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163700.34 2307467.77 3.00 AC014 AC014 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163717.27 2307432.88 3.00 Urban Crossroads, Inc.
159
1863
Name M. ID Result. PWL Lw / Li Operating Time Height Coordinates Day Evening Night Type Value norm. Day Special Night X Y Z (dBA) (dBA) (dBA) dB(A) (min) (min) (min) (ft) (ft) (ft) (ft) AC015 AC015 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163686.80 2307496.68 3.00 AC016 AC016 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163726.38 2307413.35 3.00 AC017 AC017 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163708.16 2307452.67 3.00 AC018 AC018 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163769.37 2307535.59 3.00 AC019 AC019 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163942.93 2307518.44 3.00 AC020 AC020 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163927.11 2307533.08 3.00 AC021 AC021 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163971.78 2307492.52 3.00 AC022 AC022 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163995.23 2307470.86 3.00 AC023 AC023 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163958.84 2307503.55 3.00 AC024 AC024 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163782.64 2307542.61 3.00 AC025 AC025 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163802.12 2307551.84 3.00 AC026 AC026 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163821.86 2307561.07 3.00 AC027 AC027 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163865.74 2307582.68 3.00 AC028 AC028 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163836.92 2307568.97 3.00 AC029 AC029 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163845.61 2307440.92 3.00 AC030 AC030 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163861.45 2307425.96 3.00 AC031 AC031 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163897.69 2307393.10 3.00 AC032 AC032 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163829.86 2307455.64 3.00 AC033 AC033 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163874.34 2307414.86 3.00 AC034 AC034 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6164078.91 2307393.77 3.00 AC035 AC035 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6164049.95 2307419.57 3.00 AC036 AC036 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6164111.78 2307363.96 3.00 AC037 AC037 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6164062.93 2307408.59 3.00 AC038 AC038 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6164026.40 2307441.13 3.00 AC039 AC039 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6164094.79 2307379.20 3.00 AC040 AC040 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163973.23 2307337.23 3.00 AC041 AC041 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163991.78 2307326.26 3.00 AC042 AC042 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6164052.98 2307290.85 3.00 AC043 AC043 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163953.44 2307348.61 3.00 AC044 AC044 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6164010.49 2307315.09 3.00 AC045 AC045 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6164025.47 2307307.04 3.00 AC046 AC046 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163919.84 2307246.34 3.00 AC047 AC047 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163957.10 2307224.20 3.00 AC048 AC048 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163938.40 2307235.38 3.00 AC049 AC049 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163900.05 2307257.72 3.00 AC050 AC050 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163999.59 2307199.96 3.00 AC051 AC051 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163972.09 2307216.16 3.00 AC052 AC052 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163925.12 2307211.42 3.00 AC053 AC053 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163906.56 2307222.38 3.00 AC054 AC054 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163986.31 2307176.01 3.00 AC055 AC055 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163943.82 2307200.24 3.00 AC056 AC056 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163958.80 2307192.20 3.00 AC057 AC057 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163886.77 2307233.76 3.00 AC058 AC058 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163906.46 2307100.01 3.00 AC059 AC059 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163872.77 2307119.23 3.00 AC060 AC060 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163891.48 2307108.06 3.00 AC061 AC061 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163854.22 2307130.20 3.00 AC062 AC062 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163933.97 2307083.82 3.00 AC063 AC063 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163834.42 2307141.57 3.00 AC064 AC064 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163889.53 2307077.88 3.00 AC065 AC065 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163817.50 2307119.44 3.00 AC066 AC066 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163874.55 2307085.92 3.00 AC067 AC067 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163917.04 2307061.68 3.00 AC068 AC068 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163855.85 2307097.10 3.00 AC069 AC069 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163837.29 2307108.06 3.00 AC070 AC070 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163824.81 2306992.95 3.00 AC071 AC071 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163867.30 2306968.71 3.00 AC072 AC072 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163806.11 2307004.13 3.00 AC073 AC073 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163767.76 2307026.47 3.00 AC074 AC074 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163787.55 2307015.09 3.00 AC075 AC075 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163839.79 2306984.91 3.00 AC076 AC076 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163751.87 2307004.33 3.00 AC077 AC077 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163851.42 2306946.58 3.00 AC078 AC078 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163771.66 2306992.96 3.00 AC079 AC079 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163790.22 2306981.99 3.00 AC080 AC080 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163808.93 2306970.82 3.00 AC081 AC081 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163823.91 2306962.77 3.00 AC082 AC082 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163753.98 2306880.19 3.00 AC083 AC083 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163796.47 2306855.95 3.00 AC084 AC084 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163735.27 2306891.37 3.00 AC085 AC085 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163716.72 2306902.33 3.00 AC086 AC086 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163768.96 2306872.15 3.00 AC087 AC087 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163696.03 2307278.49 3.00 AC088 AC088 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163759.94 2307308.73 3.00 AC089 AC089 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163655.85 2307259.63 3.00 AC090 AC090 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163676.46 2307269.45 3.00 AC091 AC091 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163715.85 2307287.54 3.00 Urban Crossroads, Inc.
160
1864
Name M. ID Result. PWL Lw / Li Operating Time Height Coordinates Day Evening Night Type Value norm. Day Special Night X Y Z (dBA) (dBA) (dBA) dB(A) (min) (min) (min) (ft) (ft) (ft) (ft) AC092 AC092 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163730.98 2307295.30 3.00 AC093 AC093 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163852.22 2307373.65 3.00 AC094 AC094 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163842.06 2307356.20 3.00 AC095 AC095 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163831.91 2307338.23 3.00 AC096 AC096 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163821.49 2307320.53 3.00 AC097 AC097 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163811.33 2307302.30 3.00 AC098 AC098 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163799.61 2307284.07 3.00 AC099 AC099 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163725.66 2307156.72 3.00 AC100 AC100 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163747.53 2307193.18 3.00 AC101 AC101 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163757.95 2307210.89 3.00 AC102 AC102 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163778.26 2307246.31 3.00 AC103 AC103 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163737.37 2307174.95 3.00 AC104 AC104 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163768.10 2307228.86 3.00 AC105 AC105 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163703.78 2307118.96 3.00 AC106 AC106 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163662.89 2307047.61 3.00 AC107 AC107 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163673.05 2307065.84 3.00 AC108 AC108 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163683.47 2307083.55 3.00 AC109 AC109 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163693.62 2307101.52 3.00 AC110 AC110 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163727.86 2306729.15 3.00 AC111 AC111 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163659.25 2306681.20 3.00 AC112 AC112 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163694.31 2306705.26 3.00 AC113 AC113 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163744.35 2306740.79 3.00 AC114 AC114 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163677.49 2306692.91 3.00 AC115 AC115 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163711.15 2306717.03 3.00 AC116 AC116 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163584.78 2306798.64 3.00 AC117 AC117 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163566.54 2306786.93 3.00 AC118 AC118 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163618.44 2306822.76 3.00 AC119 AC119 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163635.15 2306834.88 3.00 AC120 AC120 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163601.60 2306810.99 3.00 AC121 AC121 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163651.64 2306846.52 3.00 AC122 AC122 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163586.17 2306859.96 3.00 AC123 AC123 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163547.62 2306842.03 3.00 AC124 AC124 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163623.20 2306877.98 3.00 AC125 AC125 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163567.54 2306850.56 3.00 AC126 AC126 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163641.39 2306886.73 3.00 AC127 AC127 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163604.72 2306868.79 3.00 AC128 AC128 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163507.12 2306977.12 3.00 AC129 AC129 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163562.79 2307004.54 3.00 AC130 AC130 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163544.31 2306995.35 3.00 AC131 AC131 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163487.20 2306968.59 3.00 AC132 AC132 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163525.75 2306986.52 3.00 AC133 AC133 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163580.98 2307013.30 3.00 AC134 AC134 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163502.64 2307082.33 3.00 AC135 AC135 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163539.31 2307100.28 3.00 AC136 AC136 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163521.12 2307091.52 3.00 AC137 AC137 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163465.46 2307064.10 3.00 AC138 AC138 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163484.09 2307073.50 3.00 AC139 AC139 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163445.54 2307055.57 3.00 AC140 AC140 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163421.85 2307181.32 3.00 AC141 AC141 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163383.30 2307163.38 3.00 AC142 AC142 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163477.07 2307208.09 3.00 AC143 AC143 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163458.88 2307199.33 3.00 AC144 AC144 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163403.22 2307171.91 3.00 AC145 AC145 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163440.40 2307190.14 3.00 AC146 AC146 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163479.14 2307402.21 3.00 AC147 AC147 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163516.21 2307327.17 3.00 AC148 AC148 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163525.24 2307309.11 3.00 AC149 AC149 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163506.75 2307345.51 3.00 AC150 AC150 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163497.65 2307363.93 3.00 AC151 AC151 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163487.96 2307382.41 3.00 AC152 AC152 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163323.99 2307328.85 3.00 AC153 AC153 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163379.52 2307356.54 3.00 AC154 AC154 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163304.11 2307320.23 3.00 AC155 AC155 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163342.57 2307338.35 3.00 AC156 AC156 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163361.08 2307347.26 3.00 AC157 AC157 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163452.83 2307238.05 3.00 AC158 AC158 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163396.13 2307211.28 3.00 AC159 AC159 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163414.71 2307220.77 3.00 AC160 AC160 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163376.25 2307202.65 3.00 AC161 AC161 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163433.22 2307229.68 3.00 AC162 AC162 76.0 76.0 76.0 Lw 76 675.00 0.00 270.00 3.00 g 6163585.42 2307213.44 3.00 TRASH1 TRASH1 89.0 89.0 89.0 Lw 89 150.00 0.00 90.00 8.00 a 6163795.92 2307459.32 8.00 TRASH2 TRASH2 89.0 89.0 89.0 Lw 89 150.00 0.00 90.00 8.00 a 6163959.98 2307388.14 8.00 TRASH3 TRASH3 89.0 89.0 89.0 Lw 89 150.00 0.00 90.00 8.00 a 6163682.21 2306944.12 8.00 TRASH4 TRASH4 89.0 89.0 89.0 Lw 89 150.00 0.00 90.00 8.00 a 6163542.88 2307206.28 8.00 Urban Crossroads, Inc.
161
1865
Line Source(s)
Name M. ID Result. PWL Result. PWL' Lw / Li Operating Time Moving Pt. Src Height Day Evening Night Day Evening Night Type Value norm. Day Special Night Number Speed (dBA) (dBA) (dBA) (dBA) (dBA) (dBA) dB(A) (min) (min) (min) Day Evening Night (mph) (ft) Name ID Height Coordinates
Begin End x y z Ground
(ft) (ft) (ft) (ft) (ft) (ft)
Area Source(s)
Name M. ID Result. PWL Result. PWL'' Lw / Li Operating Time Height Day Evening Night Day Evening Night Type Value norm. Day Special Night (ft) (dBA) (dBA) (dBA) (dBA) (dBA) (dBA) dB(A) (min) (min) (min) PARK1 PARK1 79.0 79.0 79.0 53.8 53.8 53.8 Lw 79 0. a
PARK2 PARK2 76.0 76.0 76.0 54.2 54.2 54.2 Lw 76 0. a
PARK3 PARK3 73.0 73.0 73.0 55.4 55.4 55.4 Lw 73 0. a
PARK4 PARK4 76.0 76.0 76.0 54.1 54.1 54.1 Lw 76 0. a
PARK5 PARK5 76.0 76.0 76.0 54.5 54.5 54.5 Lw 76 0. a
PARK6 PARK6 76.0 76.0 76.0 54.0 54.0 54.0 Lw 76 0. a
Name ID Height Coordinates
Begin End x y z Ground
(ft) (ft) (ft) (ft) (ft) (ft)
PARK1 PARK1 0.00 a 6163565.58 2307196.74 0.00 0.00
6163651.82 2307015.82 0.00 0.00
6163634.80 2307008.01 0.00 0.00
6163550.39 2307189.36 0.00 0.00
PARK2 PARK2 0.00 a 6163987.43 2307389.83 0.00 0.00
6164054.62 2307329.15 0.00 0.00
6164041.86 2307316.65 0.00 0.00
6163975.45 2307376.28 0.00 0.00
PARK3 PARK3 0.00 a 6163692.31 2306935.77 0.00 0.00
6163678.25 2306943.93 0.00 0.00
6163694.92 2306975.87 0.00 0.00
6163710.72 2306967.02 0.00 0.00
PARK4 PARK4 0.00 a 6163764.18 2307355.75 0.00 0.00
6163778.61 2307366.60 0.00 0.00
6163789.24 2307380.92 0.00 0.00
6163792.93 2307389.28 0.00 0.00
6163796.29 2307406.96 0.00 0.00
6163794.67 2307425.52 0.00 0.00
6163811.70 2307429.10 0.00 0.00
6163813.76 2307417.60 0.00 0.00
6163813.00 2307394.59 0.00 0.00
6163809.97 2307383.20 0.00 0.00
6163798.57 2307362.58 0.00 0.00
6163782.62 2307346.31 0.00 0.00
6163772.86 2307339.91 0.00 0.00
PARK5 PARK5 0.00 a 6163624.85 2307269.15 0.00 0.00
6163557.44 2307235.25 0.00 0.00
6163548.11 2307252.83 0.00 0.00
6163616.17 2307286.95 0.00 0.00
PARK6 PARK6 0.00 a 6163789.05 2306789.91 0.00 0.00
6163773.95 2306778.80 0.00 0.00
6163715.46 2306857.75 0.00 0.00
6163730.57 2306867.65 0.00 0.00
6163761.06 2306823.92 0.00 0.00
Barrier(s)
Name Sel. M. ID Absorption Z-Ext. Cantilever Height Coordinates left right horz. vert. Begin End x y z Ground
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft)
B1 B1 6.00 r 6163422.44 2307554.16 6.00 0.00
6163448.92 2307497.30 6.00 0.00
6163448.48 2307486.02 6.00 0.00
6163382.51 2307453.47 6.00 0.00
6163330.86 2307430.03 6.00 0.00
6163284.42 2307405.72 6.00 0.00
6163260.55 2307396.61 6.00 0.00
6163235.81 2307452.60 6.00 0.00
B2 B2 6.00 r 6164064.80 2307742.52 6.00 0.00
6163927.82 2307674.29 6.00 0.00
6163892.41 2307729.50 6.00 0.00
6163859.07 2307792.00 6.00 0.00
6163840.32 2307837.31 6.00 0.00
B3 B3 6.00 r 6163869.37 2306484.47 6.00 0.00
6163820.54 2306538.72 6.00 0.00
6163819.46 2306558.25 6.00 0.00
Urban Crossroads, Inc.
162
1866
Name Sel. M. ID Absorption Z-Ext. Cantilever Height Coordinates left right horz. vert. Begin End x y z Ground
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft)
6163883.48 2306635.29 6.00 0.00
6163954.01 2306747.05 6.00 0.00
6164021.28 2306864.24 6.00 0.00
6164087.47 2306979.26 6.00 0.00
6164158.00 2307088.85 6.00 0.00
6164187.30 2307150.70 6.00 0.00
6164229.62 2307215.80 6.00 0.00
6164307.74 2307159.38 6.00 0.00
Building(s)
Name Sel. M. ID RB Residents Absorption Height Coordinates Begin x y z Ground
(ft) (ft) (ft) (ft) (ft)
2-Story10 2-Story10 x 0 0.00 a 6163582.07 2307021.44 0.00 0.00 6163605.68 2306972.49 0.00 0.00
6163494.57 2306918.67 0.00 0.00
6163470.61 2306967.97 0.00 0.00
2-Story09 2-Story09 x 0 0.00 a 6163626.17 2306931.17 0.00 0.00 6163649.78 2306881.17 0.00 0.00
6163536.58 2306827.69 0.00 0.00
6163512.63 2306878.04 0.00 0.00
2-Story08 2-Story08 x 0 0.00 a 6163524.43 2307149.22 0.00 0.00 6163550.13 2307095.75 0.00 0.00
6163434.85 2307040.89 0.00 0.00
6163408.81 2307094.71 0.00 0.00
2-Story07 2-Story07 x 0 0.00 a 6163487.97 2307221.10 0.00 0.00 6163511.24 2307170.75 0.00 0.00
6163398.74 2307118.32 0.00 0.00
6163375.13 2307169.01 0.00 0.00
2-Story06 2-Story06 x 0 0.00 a 6163436.39 2307281.40 0.00 0.00 6163458.62 2307231.75 0.00 0.00
6163364.52 2307186.96 0.00 0.00
6163341.95 2307236.96 0.00 0.00
2-Story05 2-Story05 x 0 0.00 a 6163392.64 2307372.18 0.00 0.00 6163416.86 2307321.77 0.00 0.00
6163321.38 2307277.67 0.00 0.00
6163297.07 2307326.71 0.00 0.00
2-Story04 2-Story04 x 0 0.00 a 6163483.46 2307412.11 0.00 0.00 6163537.27 2307300.65 0.00 0.00
6163488.66 2307277.39 0.00 0.00
6163434.15 2307388.85 0.00 0.00
2-Story03 2-Story03 x 0 0.00 a 6163660.19 2306862.34 0.00 0.00 6163691.03 2306816.52 0.00 0.00
6163588.29 2306744.78 0.00 0.00
6163557.05 2306790.88 0.00 0.00
2-Story02 2-Story02 x 0 0.00 a 6163719.51 2306781.66 0.00 0.00 6163751.77 2306736.49 0.00 0.00
6163649.27 2306664.36 0.00 0.00
6163616.60 2306709.81 0.00 0.00
2-Story01 2-Story01 x 0 0.00 a 6163704.59 2307136.36 0.00 0.00 6163754.58 2307109.35 0.00 0.00
6163702.78 2307020.87 0.00 0.00
6163654.02 2307045.49 0.00 0.00
3-Story01 3-Story01 x 0 0.00 a 6163826.31 2306882.61 0.00 0.00 6163803.31 2306842.89 0.00 0.00
6163704.57 2306899.97 0.00 0.00
6163727.14 2306939.46 0.00 0.00
3-Story02 3-Story02 x 0 0.00 a 6163853.04 2307393.24 0.00 0.00 6163905.21 2307365.01 0.00 0.00
6163841.59 2307256.36 0.00 0.00
6163788.93 2307284.67 0.00 0.00
3-Story03 3-Story03 x 0 0.00 a 6163778.22 2307265.75 0.00 0.00 6163826.50 2307236.85 0.00 0.00
6163765.26 2307128.86 0.00 0.00
6163717.34 2307156.34 0.00 0.00
3-Story04 3-Story04 x 0 0.00 a 6163892.17 2307512.56 0.00 0.00 6163922.42 2307546.46 0.00 0.00
6164006.72 2307469.00 0.00 0.00
6163977.59 2307435.47 0.00 0.00
3-Story05 3-Story05 x 0 0.00 a 6163873.42 2307594.07 0.00 0.00 6163893.48 2307553.44 0.00 0.00
6163770.82 2307494.59 0.00 0.00
6163751.55 2307535.99 0.00 0.00
3-Story06 3-Story06 x 0 0.00 a 6163864.51 2306946.84 0.00 0.00 6163841.50 2306907.13 0.00 0.00
6163724.10 2306975.49 0.00 0.00
Urban Crossroads, Inc.
163
1867
Name Sel. M. ID RB Residents Absorption Height Coordinates Begin x y z Ground
(ft) (ft) (ft) (ft) (ft)
6163746.67 2307014.99 0.00 0.00
3-Story07 3-Story07 x 0 0.00 a 6163893.15 2306998.49 0.00 0.00 6163870.15 2306958.78 0.00 0.00
6163752.74 2307027.14 0.00 0.00
6163775.31 2307066.64 0.00 0.00
3-Story08 3-Story08 x 0 0.00 a 6163931.78 2307063.60 0.00 0.00 6163908.78 2307023.88 0.00 0.00
6163791.37 2307092.24 0.00 0.00
6163813.94 2307131.74 0.00 0.00
3-Story09 3-Story09 x 0 0.00 a 6163959.99 2307113.94 0.00 0.00 6163936.99 2307074.23 0.00 0.00
6163819.58 2307142.59 0.00 0.00
6163842.15 2307182.09 0.00 0.00
3-Story10 3-Story10 x 0 0.00 a 6163997.32 2307178.61 0.00 0.00 6163974.31 2307138.90 0.00 0.00
6163856.91 2307207.26 0.00 0.00
6163879.48 2307246.76 0.00 0.00
3-Story11 3-Story11 x 0 0.00 a 6164024.66 2307227.66 0.00 0.00 6164001.66 2307187.95 0.00 0.00
6163884.25 2307256.31 0.00 0.00
6163906.82 2307295.80 0.00 0.00
3-Story12 3-Story12 x 0 0.00 a 6164065.89 2307293.20 0.00 0.00 6164042.89 2307253.48 0.00 0.00
6163925.49 2307321.84 0.00 0.00
6163948.06 2307361.34 0.00 0.00
3-Story13 3-Story13 x 0 0.00 a 6163994.00 2307420.11 0.00 0.00 6164024.24 2307454.02 0.00 0.00
6164124.17 2307362.23 0.00 0.00
6164095.04 2307328.70 0.00 0.00
3-Story14 3-Story14 x 0 0.00 a 6163817.44 2307456.04 0.00 0.00 6163847.68 2307489.95 0.00 0.00
6163931.72 2307411.45 0.00 0.00
6163902.59 2307377.92 0.00 0.00
3-Story15 3-Story15 x 0 0.00 a 6163766.91 2307418.02 0.00 0.00 6163725.51 2307398.75 0.00 0.00
6163676.55 2307502.14 0.00 0.00
6163717.17 2307521.67 0.00 0.00
3-Story16 3-Story16 x 0 0.00 a 6163719.26 2307380.26 0.00 0.00 6163677.85 2307360.99 0.00 0.00
6163622.12 2307482.87 0.00 0.00
6163662.75 2307502.40 0.00 0.00
3-Story17 3-Story17 x 0 0.00 a 6163652.33 2307347.19 0.00 0.00 6163610.92 2307327.92 0.00 0.00
6163555.20 2307449.79 0.00 0.00
6163595.82 2307469.33 0.00 0.00
3-Story18 3-Story18 x 0 0.00 a 6163653.70 2307247.61 0.00 0.00 6163633.71 2307288.68 0.00 0.00
6163754.61 2307346.50 0.00 0.00
6163774.84 2307306.22 0.00 0.00
PoolBLDG PoolBLDG x 0 0.00 a 6163574.38 2307220.04 0.00 0.00 6163628.55 2307245.56 0.00 0.00
6163637.66 2307227.33 0.00 0.00
6163582.97 2307201.81 0.00 0.00
Ground Absorption(s)
Name Sel. M. ID G Coordinates
x y
(ft) (ft)
Contour(s)
Name Sel. M. ID OnlyPts Height Coordinates
Begin End x y z
(ft) (ft) (ft) (ft) (ft)
Vertical Area Source(s)
Name ID Height Coordinates
Begin End x y z Ground
(ft) (ft) (ft) (ft) (ft) (ft)
Rail
Name Sel. M. ID Lw' Train Class Correct. Vmax
Day Night Track
(dBA) (dBA) (dB) (km(mph)
Urban Crossroads, Inc.
164
1868
Sound Level Spectra
Name ID Type Oktave Spectrum (dB) Source
Weight. 31.5 63 125 250 500 1000 2000 4000 8000 A lin
Roads
Name Sel. M. ID Lme Count Data exact Count Data Speed Limit SCS Surface Gradient Mult. Reflection Day Evening Night DTV Str.class. M p (%) Auto Truck Dist. Dstro Type Drefl Hbuild Dist. (dBA) (dBA) (dBA) Day Evening Night Day Evening Night (mph) (mph) (dB) (%) (dB) (ft) (ft) RoadsGeo
Name Height Coordinates Dist LSlope
Begin End x y z Ground (ft) (%)
(ft) (ft) (ft) (ft) (ft) (ft)
Urban Crossroads, Inc.
165
1869
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
This page was intentionally left blank.
166
1870
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
APPENDIX 11.1:
CADNAA CONSTRUCTION NOISE MODEL INPUTS
167
1871
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
This page was intentionally left blank.
168
1872
15662 - Ontario Esperanza PA-11
CadnaA Noise Prediction Model: 15662-05_Construction.cna Date: 24.04.25
Analyst: B. Maddux
Calculation Configuration
Configuration
Parameter Value
General
Max. Error (dB) 0.00
Max. Search Radius (ft) 6561.70
Min. Dist Src to Rcvr 0.00
Partition
Raster Factor 0.50
Max. Length of Section (ft) 3280.80
Min. Length of Section (ft) 3.30
Min. Length of Section (%) 0.00
Proj. Line Sources On
Proj. Area Sources On
Ref. Time
Daytime Penalty (dB) 0.00
Recr. Time Penalty (dB) 5.00
Night-time Penalty (dB) 10.00
DTM
Standard Height (m) 0.00
Model of Terrain Triangulation
Reflection
max. Order of Reflection 2
Search Radius Src 328.08
Search Radius Rcvr 328.08
Max. Distance Source - Rcvr 3280.84 3280.84
Min. Distance Rvcr - Reflector 3.28 3.28
Min. Distance Source - Reflector 0.33
Industrial (ISO 9613 (1996))
Lateral Diffraction some Obj
Obst. within Area Src do not shield On
Screening Incl. Ground Att. over Barrier
Dz with limit (20/25)
Barrier Coefficients C1,2,3 3.0 20.0 0.0
Temperature (°F) 50
rel. Humidity (%) 70
Ground Absorption G 0.50
Wind Speed for Dir. (mph) 6.7
Roads (TNM)
Railways (FTA/FRA)
Aircraft (???)
Strictly acc. to AzB
Receiver Noise Levels
Name M. ID Level Lr Limit. Value Land Use Height Coordinates Day Night CNEL Day Night CNEL Type Auto Noise Type X Y Z (dBA) (dBA) (dBA) (dBA) (dBA) (dBA) (ft) (ft) (ft) (ft) R1 R1 65.3 -34.7 62.3 0.0 0.0 0.0 x Total 5.00 r 6164064.26 2307541.04 5.00 R2 R2 63.8 -36.2 60.8 0.0 0.0 0.0 x Total 5.00 r 6163960.44 2307660.13 5.00 R3 R3 64.3 -35.7 61.3 0.0 0.0 0.0 x Total 5.00 r 6163414.11 2307485.36 5.00 R4 R4 61.0 -39.0 58.0 0.0 0.0 0.0 x Total 5.00 r 6163268.40 2307065.85 5.00 R5 R5 57.2 -42.8 54.2 0.0 0.0 0.0 x Total 5.00 r 6163701.04 2306426.26 5.00 R6 R6 62.0 -38.0 59.0 0.0 0.0 0.0 x Total 5.00 r 6164053.38 2306904.23 5.00 Point Source(s)
Name M. ID Result. PWL Lw / Li Operating Time Height Coordinates Day Evening Night Type Value norm. Day Special Night X Y Z (dBA) (dBA) (dBA) dB(A) (min) (min) (min) (ft) (ft) (ft) (ft) Line Source(s)
Name M. ID Result. PWL Result. PWL' Lw / Li Operating Time Moving Pt. Src Height Day Evening Night Day Evening Night Type Value norm. Day Special Night Number Speed (dBA) (dBA) (dBA) (dBA) (dBA) (dBA) dB(A) (min) (min) (min) Day Evening Night (mph) (ft) Name ID Height Coordinates
Begin End x y z Ground
(ft) (ft) (ft) (ft) (ft) (ft)
Area Source(s)
Urban Crossroads, Inc.
169
1873
Name M. ID Result. PWL Result. PWL'' Lw / Li Operating Time Height Day Evening Night Day Evening Night Type Value norm. Day Special Night (ft) (dBA) (dBA) (dBA) (dBA) (dBA) (dBA) dB(A) (min) (min) (min) CA CA1 115.6 15.6 15.6 69.3 -30.7 -30.7 PWL-Pt 115.6 8 a Name ID Height Coordinates
Begin End x y z Ground
(ft) (ft) (ft) (ft) (ft) (ft)
CA CA1 8.00 a 6164168.97 2307351.23 8.00 0.00
6164154.42 2307333.20 8.00 0.00
6164143.16 2307318.49 8.00 0.00
6164119.04 2307284.49 8.00 0.00
6164103.94 2307261.15 8.00 0.00
6163938.77 2306975.94 8.00 0.00
6163830.57 2306788.91 8.00 0.00
6163786.70 2306725.09 8.00 0.00
6163759.41 2306691.81 8.00 0.00
6163730.15 2306660.25 8.00 0.00
6163697.34 2306660.26 8.00 0.00
6163657.03 2306705.64 8.00 0.00
6163627.35 2306743.01 8.00 0.00
6163607.82 2306770.12 8.00 0.00
6163591.91 2306793.94 8.00 0.00
6163579.27 2306814.18 8.00 0.00
6163569.55 2306830.61 8.00 0.00
6163406.23 2307166.18 8.00 0.00
6163313.54 2307360.00 8.00 0.00
6163319.66 2307377.33 8.00 0.00
6163454.49 2307441.81 8.00 0.00
6163628.11 2307524.84 8.00 0.00
6163661.12 2307538.03 8.00 0.00
6163757.66 2307569.42 8.00 0.00
6163771.15 2307574.13 8.00 0.00
6163797.44 2307585.28 8.00 0.00
6163827.58 2307601.59 8.00 0.00
6163844.32 2307612.52 8.00 0.00
6163888.91 2307643.60 8.00 0.00
6163908.95 2307642.78 8.00 0.00
6163952.01 2307592.23 8.00 0.00
6163999.21 2307545.54 8.00 0.00
6164171.37 2307389.23 8.00 0.00
Barrier(s)
Name Sel. M. ID Absorption Z-Ext. Cantilever Height Coordinates left right horz. vert. Begin End x y z Ground
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft)
Building(s)
Name Sel. M. ID RB Residents Absorption Height Coordinates Begin x y z Ground
(ft) (ft) (ft) (ft) (ft)
Ground Absorption(s)
Name Sel. M. ID G Coordinates
x y
(ft) (ft)
Contour(s)
Name Sel. M. ID OnlyPts Height Coordinates
Begin End x y z
(ft) (ft) (ft) (ft) (ft)
Vertical Area Source(s)
Name ID Height Coordinates
Begin End x y z Ground
(ft) (ft) (ft) (ft) (ft) (ft)
Rail
Name Sel. M. ID Lw' Train Class Correct. Vmax
Day Night Track
(dBA) (dBA) (dB) (km(mph)
Sound Level Spectra
Urban Crossroads, Inc.
170
1874
Name ID Type Oktave Spectrum (dB) Source
Weight. 31.5 63 125 250 500 1000 2000 4000 8000 A lin
Roads
Name Sel. M. ID Lme Count Data exact Count Data Speed Limit SCS Surface Gradient Mult. Reflection Day Evening Night DTV Str.class. M p (%) Auto Truck Dist. Dstro Type Drefl Hbuild Dist. (dBA) (dBA) (dBA) Day Evening Night Day Evening Night (mph) (mph) (dB) (%) (dB) (ft) (ft) RoadsGeo
Name Height Coordinates Dist LSlope
Begin End x y z Ground (ft) (%)
(ft) (ft) (ft) (ft) (ft) (ft)
Urban Crossroads, Inc.
171
1875
Esperanza Specific Plan Amendment Noise Impact Analysis 15662-06 Noise Study.docx
This page was intentionally left blank.
172
1876
DATE: May 29, 2024
TO: Dave Waters, Genstar Development Company/GDCI-13
FROM: Charlene So, Urban Crossroads
JOB NO: 15662-04 TG Letter
ESPERANZA SPECIFIC PLAN TRIP GENERATION ASSESSMENT
Urban Crossroads, Inc. is pleased to submit the following Trip Generation Assessment for Esperanza Specific Plan development (Project) to support the proposed Specific Plan Amendment (SPA), located on the northeast corner of Eucalyptus Avenue and Amherst Avenue in the City of Ontario. This letter describes the proposed Project trip generation methodology and determines whether any traffic operations analysis is required based on San Bernardino County’s Transportation Impact Study Guidelines (July 9, 2019, County Guidelines). The County Guidelines have been utilized as the City does not have their own adopted guidelines.
PROPOSED PROJECT
It is our understanding that the proposed Project is to consist of 161 multi-family residential dwelling units (with a density of approximately 16.1 dwelling units to the net acre). The Project is located within the Esperanza Specific Plan. The original currently-approved Specific Plan contemplated a 736-student elementary school within Planning Area 11. The land use will be updated from “School” to “MDR Medium Density Residential” consistent with the adjacent land use to the northeast.
Exhibit 1 shows the preliminary site plan. For comparison purposes, Exhibit 2 shows the currently-approved land use plan identifying Planning Area 11 with a school.
1877
Dave Waters, Genstar Development Company/GDCI-13
May 29, 2024