Cities Index.
Agenda packet

Orange City Council
June 14, 2022

Document
Agenda packet
Meeting
June 14, 2022
Body
Orange City Council
Pages
22
Original file
262.6 MB
Text extracted from the city's file for reading and search. Open the original on cityoforange.legistar.com. That file is the official record.

Section 1771.1. Registration as a contractor or subcontractor required prior to bid submission; exceptions; violations; penalties
(a) A contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5. It is not a violation of this section for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded.
(b) Notice of the requirement described in subdivision (a) shall be included in all bid invitations and public works contracts, and a bid shall not be accepted nor any contract or subcontract entered into without proof of the contractor or subcontractor's current registration to perform public work pursuant to Section 1725.5. (c) An inadvertent error in listing a subcontractor who is not registered pursuant to Section 1725.5 in a bid proposal shall not be grounds for filing a bid protest or grounds for considering the bid nonresponsive, provided that any of the following apply:
(1) The subcontractor is registered prior to the bid opening. (2) Within 24 hours after the bid opening, the subcontractor is registered and has paid the penalty registration fee specified in subparagraph (E) of paragraph (2) of subdivision (a) of Section 1725.5. (3) The subcontractor is replaced by another registered subcontractor pursuant to Section 4107 of the Public Contract Code.
(d) Failure by a subcontractor to be registered to perform public work as required by subdivision (a) shall be grounds under Section 4107 of the Public Contract Code for the contractor, with the consent of the awarding authority, to substitute a subcontractor who is registered to perform public work pursuant to Section 1725.5 in place of the unregistered subcontractor.
(e) The department shall maintain on its Internet Web site a list of contractors who are currently registered to perform public work pursuant to Section 1725.5.
(f) A contract entered into with any contractor or subcontractor in violation of subdivision (a) shall be subject to cancellation, provided that a contract for public work shall not be unlawful, void, or voidable solely due to the failure of the awarding body, contractor, or any subcontractor to comply with the requirements of Section 1725.5 or this section.
(g) If the Labor Commissioner or his or her designee determines that a contractor or subcontractor engaged in the performance of any public work contract without having been registered in accordance with this section, the contractor or subcontractor shall forfeit, as a civil penalty to the state, one hundred dollars ($100) for each day of work performed in violation of the registration requirement, not to exceed an aggregate penalty of eight thousand dollars ($8,000) in addition to any penalty registration fee assessed pursuant to clause (ii) of subparagraph (E) of paragraph (2) of subdivision (a) of Section 1725.5. (h)(1) In addition to, or in lieu of, any other penalty or sanction authorized pursuant to this chapter, a higher tiered public works contractor or subcontractor who is found to have entered into a subcontract with an unregistered lower tier subcontractor to perform any public work in violation of the requirements of Section 1725.5 or this section shall be subject to forfeiture, as a civil penalty to the state, of one hundred dollars ($100) 333
Attachment No. 1

Page 4 of 13 ends

for each day the unregistered lower tier subcontractor performs work in violation of the registration requirement, not to exceed an aggregate penalty of ten thousand dollars ($10,000). (2) The Labor Commissioner shall use the same standards specified in subparagraph (A) of paragraph (2) of subdivision (a) of Section 1775 when determining the severity of the violation and what penalty to assess, and may waive the penalty for a first time violation that was unintentional and did not hinder the Labor Commissioner's ability to monitor and enforce compliance with the requirements of this chapter. (3) A higher tiered public works contractor or subcontractor shall not be liable for penalties assessed pursuant to paragraph (1) if the lower tier subcontractor's performance is in violation of the requirements of Section 1725.5 due to the revocation of a previously approved registration. (4) A subcontractor shall not be liable for any penalties assessed against a higher tiered public works contractor or subcontractor pursuant to paragraph (1). A higher tiered public works contractor or subcontractor may not require a lower tiered subcontractor to indemnify or otherwise be liable for any penalties pursuant to paragraph (1).
(i) The Labor Commissioner or his or her designee shall issue a civil wage and penalty assessment, in accordance with the provisions of Section 1741, upon determination of penalties pursuant to subdivision (g) and subparagraph (B) of paragraph (1) of subdivision (h). Review of a civil wage and penalty assessment issued under this subdivision may be requested in accordance with the provisions of Section 1742. The regulations of the Director of Industrial Relations, which govern proceedings for review of civil wage and penalty assessments and the withholding of contract payments under Article 1 (commencing with Section 1720) and Article 2 (commencing with Section 1770), shall apply. (j)(1) Where a contractor or subcontractor engages in the performance of any public work contract without having been registered in violation of the requirements of Section 1725.5 or this section, the Labor Commissioner shall issue and serve a stop order prohibiting the use of the unregistered contractor or the unregistered subcontractor on all public works until the unregistered contractor or unregistered subcontractor is registered. The stop order shall not apply to work by registered contractors or subcontractors on the public work.
(2) A stop order may be personally served upon the contractor or subcontractor by either of the following methods:
(A) Manual delivery of the order to the contractor or subcontractor personally. (B) Leaving signed copies of the order with the person who is apparently in charge at the site of the public work and by thereafter mailing copies of the order by first class mail, postage prepaid to the contractor or subcontractor at one of the following:
(i) The address of the contractor or subcontractor on file with either the Secretary of State or the Contractors' State License Board.
(ii) If the contractor or subcontractor has no address on file with the Secretary of State or the Contractors' State License Board, the address of the site of the public work. (3) The stop order shall be effective immediately upon service and shall be subject to appeal by the party contracting with the unregistered contractor or subcontractor, by the unregistered contractor or subcontractor, or both. The appeal, hearing, and any further review of the hearing decision shall be governed by the procedures, time limits, and other requirements specified in subdivision (a) of Section 238.1. 334
Attachment No. 1

Page 5 of 13 ends

(4) Any employee of an unregistered contractor or subcontractor who is affected by a work stoppage ordered by the commissioner pursuant to this subdivision shall be paid at his or her regular hourly prevailing wage rate by that employer for any hours the employee would have worked but for the work stoppage, not to exceed 10 days.
(k) Failure of a contractor or subcontractor, owner, director, officer, or managing agent of the contractor or subcontractor to observe a stop order issued and served upon him or her pursuant to subdivision (j) is guilty of a misdemeanor punishable by imprisonment in county jail not exceeding 60 days or by a fine not exceeding ten thousand dollars ($10,000), or both.
(l) This section shall apply to any bid proposal submitted on or after March 1, 2015, and any contract for public work entered into on or after April 1, 2015. This section shall also apply to the performance of any public work, as defined in this chapter, on or after January 1, 2018, regardless of when the contract for public work was entered.
(m) Penalties received pursuant to this section shall be deposited in the State Public Works Enforcement Fund established by Section 1771.3 and shall be used only for the purposes specified in that section. (n) This section shall not apply to work performed on a public works project of twenty-five thousand dollars ($25,000) or less when the project is for construction, alteration, demolition, installation, or repair work or to work performed on a public works project of fifteen thousand dollars ($15,000) or less when the project is for maintenance work.

Section 1771.4. Additional requirements when bidding and awarding public works contracts (a) All of the following are applicable to all public works projects that are otherwise subject to the requirements of this chapter:
(1) The call for bids and contract documents shall specify that the project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. (2) The awarding body shall post or require the prime contractor to post job site notices, as prescribed by regulation.
(3) Each contractor and subcontractor shall furnish the records specified in Section 1776 directly to the Labor Commissioner, in the following manner:
(A) At least monthly or more frequently if specified in the contract with the awarding body. (B) In a format prescribed by the Labor Commissioner.
(4) If the contractor or subcontractor is not registered pursuant to Section 1725.5 and is performing work on a project for which registration is not required because of subdivision (f) of Section 1725.5, the unregistered contractor or subcontractor is not required to furnish the records specified in Section 1776 directly to the Labor Commissioner but shall retain the records specified in Section 1776for at least three years after completion of the work.
(5) The department shall undertake those activities it deems necessary to monitor and enforce compliance with prevailing wage requirements.
335
Attachment No. 1

Page 6 of 13 ends

(b) The Labor Commissioner may exempt a public works project from compliance with all or part of the requirements of subdivision (a) if either of the following occurs:
(1) The awarding body has enforced an approved labor compliance program, as defined in Section 1771.5, on all public works projects under its authority, except those deemed exempt pursuant to subdivision (a) of Section 1771.5, continuously since December 31, 2011.
(2) The awarding body has entered into a collective bargaining agreement that binds all contractors performing work on the project and that includes a mechanism for resolving disputes about the payment of wages. (c) The requirements of paragraph (1) of subdivision (a) shall only apply to contracts for public works projects awarded on or after January 1, 2015.
(d) The requirements of paragraph (3) of subdivision (a) shall apply to all contracts for public work, whether new or ongoing, on or after January 1, 2016.

Section 1775. Penalties for violations
(a)(1) The contractor and any subcontractor under the contractor shall, as a penalty to the state or political subdivision on whose behalf the contract is made or awarded, forfeit not more than two hundred dollars ($200) for each calendar day, or portion thereof, for each worker paid less than the prevailing wage rates as determined by the director for the work or craft in which the worker is employed for any public work done under the contract by the contractor or, except as provided in subdivision (b), by any subcontractor under the contractor.
(2)(A) The amount of the penalty shall be determined by the Labor Commissioner based on consideration of both of the following:
(i) Whether the failure of the contractor or subcontractor to pay the correct rate of per diem wages was a good faith mistake and, if so, the error was promptly and voluntarily corrected when brought to the attention of the contractor or subcontractor.
(ii) Whether the contractor or subcontractor has a prior record of failing to meet its prevailing wage obligations.
(B)(i) The penalty may not be less than forty dollars ($40) for each calendar day, or portion thereof, for each worker paid less than the prevailing wage rate, unless the failure of the contractor or subcontractor to pay the correct rate of per diem wages was a good faith mistake and, if so, the error was promptly and voluntarily corrected when brought to the attention of the contractor or subcontractor. (ii) The penalty may not be less than eighty dollars ($80) for each calendar day, or portion thereof, for each worker paid less than the prevailing wage rate, if the contractor or subcontractor has been assessed penalties within the previous three years for failing to meet its prevailing wage obligations on a separate contract, unless those penalties were subsequently withdrawn or overturned. (iii) The penalty may not be less than one hundred twenty dollars ($120) for each calendar day, or portion thereof, for each worker paid less than the prevailing wage rate, if the Labor Commissioner determines that the violation was willful, as defined in subdivision (c) of Section 1777.1. (C) If the amount due under this section is collected from the contractor or subcontractor, any outstanding wage claim under Chapter 1 (commencing with Section 1720) of Part 7 of Division 2 against that contractor 336
Attachment No. 1

Page 7 of 13 ends

or subcontractor shall be satisfied before applying that amount to the penalty imposed on that contractor or subcontractor pursuant to this section.
(D) The determination of the Labor Commissioner as to the amount of the penalty shall be reviewable only for abuse of discretion.
(E) The difference between the prevailing wage rates and the amount paid to each worker for each calendar day or portion thereof for which each worker was paid less than the prevailing wage rate shall be paid to each worker by the contractor or subcontractor, and the body awarding the contract shall cause to be inserted in the contract a stipulation that this section will be complied with. (b) If a worker employed by a subcontractor on a public works project is not paid the general prevailing rate of per diem wages by the subcontractor, the prime contractor of the project is not liable for any penalties under subdivision (a) unless the prime contractor had knowledge of that failure of the subcontractor to pay the specified prevailing rate of wages to those workers or unless the prime contractor fails to comply with all of the following requirements:
(1) The contract executed between the contractor and the subcontractor for the performance of work on the public works project shall include a copy of the provisions of this section and Sections 1771, 1776, 1777.5, 1813, and 1815.
(2) The contractor shall monitor the payment of the specified general prevailing rate of per diem wages by the subcontractor to the employees, by periodic review of the certified payroll records of the subcontractor. (3) Upon becoming aware of the failure of the subcontractor to pay his or her workers the specified prevailing rate of wages, the contractor shall diligently take corrective action to halt or rectify the failure, including, but not limited to, retaining sufficient funds due the subcontractor for work performed on the public works project. (4) Prior to making final payment to the subcontractor for work performed on the public works project, the contractor shall obtain an affidavit signed under penalty of perjury from the subcontractor that the subcontractor has paid the specified general prevailing rate of per diem wages to his or her employees on the public works project and any amounts due pursuant to Section 1813. (c) The Division of Labor Standards Enforcement shall notify the contractor on a public works project within 15 days of the receipt by the Division of Labor Standards Enforcement of a complaint of the failure of a subcontractor on that public works project to pay workers the general prevailing rate of per diem wages.

Section 1776. Payroll records; retention; inspection; redacted information; agencies entitled to receive nonredacted copies of certified records; noncompliance penalties; rules (a) Each contractor and subcontractor shall keep accurate payroll records, showing the name, address, social security number, work classification, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed by him or her in connection with the public work. Each payroll record shall contain or be verified by a written declaration that it is made under penalty of perjury, stating both of the following:
(1) The information contained in the payroll record is true and correct. (2) The employer has complied with the requirements of Sections 1771, 1811, and 1815 for any work performed by his or her employees on the public works project. 337
Attachment No. 1

Page 8 of 13 ends

(b) The payroll records enumerated under subdivision (a) shall be certified and shall be available for inspection at all reasonable hours at the principal office of the contractor on the following basis:
(1) A certified copy of an employee's payroll record shall be made available for inspection or furnished to the employee or his or her authorized representative on request. (2) A certified copy of all payroll records enumerated in subdivision (a) shall be made available for inspection or furnished upon request to a representative of the body awarding the contract and the Division of Labor Standards Enforcement of the Department of Industrial Relations. (3) A certified copy of all payroll records enumerated in subdivision (a) shall be made available upon request by the public for inspection or for copies thereof. However, a request by the public shall be made through either the body awarding the contract or the Division of Labor Standards Enforcement. If the requested payroll records have not been provided pursuant to paragraph (2), the requesting party shall, prior to being provided the records, reimburse the costs of preparation by the contractor, subcontractors, and the entity through which the request was made. The public may not be given access to the records at the principal office of the contractor.
(c) Unless required to be furnished directly to the Labor Commissioner in accordance with paragraph (3) of subdivision (a) of Section 1771.4, the certified payroll records shall be on forms provided by the Division of Labor Standards Enforcement or shall contain the same information as the forms provided by the division.

The payroll records may consist of printouts of payroll data that are maintained as computer records, if the printouts contain the same information as the forms provided by the division and the printouts are verified in the manner specified in subdivision (a).
(d) A contractor or subcontractor shall file a certified copy of the records enumerated in subdivision (a) with the entity that requested the records within 10 days after receipt of a written request. (e) Except as provided in subdivision (f), any copy of records made available for inspection as copies and furnished upon request to the public or any public agency by the awarding body or the Division of Labor Standards Enforcement shall be marked or obliterated to prevent disclosure of an individual's name, address, and social security number. The name and address of the contractor awarded the contract or the subcontractor performing the contract shall not be marked or obliterated. Any copy of records made available for inspection by, or furnished to, a multiemployer Taft-Hartley trust fund (29 U.S.C. Sec. 186(c)(5)) that requests the records for the purposes of allocating contributions to participants shall be marked or obliterated only to prevent disclosure of an individual's full social security number, but shall provide the last four digits of the social security number. Any copy of records made available for inspection by, or furnished to, a joint labormanagement committee established pursuant to the federal Labor Management Cooperation Act of 1978 (29 U.S.C. Sec. 175a) shall be marked or obliterated only to prevent disclosure of an individual's social security number.
(f)(1) Notwithstanding any other provision of law, agencies that are included in the Joint Enforcement Strike Force on the Underground Economy established pursuant to Section 329 of the Unemployment Insurance Code and other law enforcement agencies investigating violations of law shall, upon request, be provided nonredacted copies of certified payroll records. Any copies of records or certified payroll made available for inspection and furnished upon request to the public by an agency included in the Joint Enforcement Strike Force on the Underground Economy or to a law enforcement agency investigating a violation of law shall be marked or redacted to prevent disclosure of an individual's name, address, and social security number. 338
Attachment No. 1

Page 9 of 13 ends

(2) An employer shall not be liable for damages in a civil action for any reasonable act or omission taken in good faith in compliance with this subdivision.
(g) The contractor shall inform the body awarding the contract of the location of the records enumerated under subdivision (a), including the street address, city, and county, and shall, within five working days, provide a notice of a change of location and address.
(h) The contractor or subcontractor has 10 days in which to comply subsequent to receipt of a written notice requesting the records enumerated in subdivision (a). In the event that the contractor or subcontractor fails to comply within the 10-day period, he or she shall, as a penalty to the state or political subdivision on whose behalf the contract is made or awarded, forfeit one hundred dollars ($100) for each calendar day, or portion thereof, for each worker, until strict compliance is effectuated. Upon the request of the Division of Labor Standards Enforcement, these penalties shall be withheld from progress payments then due. A contractor is not subject to a penalty assessment pursuant to this section due to the failure of a subcontractor to comply with this section.
(i) The body awarding the contract shall cause to be inserted in the contract stipulations to effectuate this section.
(j) The director shall adopt rules consistent with the California Public Records Act (Chapter 3.5 (commencing with Section 6250) of Division 7 of Title 1 of the Government Code) and the Information Practices Act of 1977 (Title 1.8 (commencing with Section 1798) of Part 4 of Division 3 of the Civil Code) governing the release of these records, including the establishment of reasonable fees to be charged for reproducing copies of records required by this section.

Section 1777.5. Employment of registered apprentices; wages; standards; number; apprenticeable craft or trade; exemptions; contributions; compliance program (a)(1) This chapter does not prevent the employment upon public works of properly registered apprentices who are active participants in an approved apprenticeship program. (2) For purposes of this chapter, “apprenticeship program” means a program under the jurisdiction of the California Apprenticeship Council established pursuant to Section 3070. (b)(1) Every apprentice employed upon public works shall be paid the prevailing rate of per diem wages for apprentices in the trade to which he or she is registered and shall be employed only at the work of the craft or trade to which he or she is registered.
(2) Unless otherwise provided by a collective bargaining agreement, when a contractor requests the dispatch of an apprentice pursuant to this section to perform work on a public works project and requires the apprentice to fill out an application or undergo testing, training, an examination, or other preemployment process as a condition of employment, the apprentice shall be paid for the time spent on the required preemployment activity, including travel time to and from the required activity, if any, at the prevailing rate of per diem wages for apprentices in the trade to which he or she is registered. Unless otherwise provided by a collective bargaining agreement, a contractor is not required to compensate an apprentice for the time spent on preemployment activities if the apprentice is required to take a preemployment drug or alcohol test and he or she fails to pass that test.
(c) Only apprentices, as defined in Section 3077, who are in training under apprenticeship standards that have been approved by the Chief of the Division of Apprenticeship Standards and who are parties to written 339
Attachment No. 1

Page 10 of 13 ends

apprentice agreements under Chapter 4 (commencing with Section 3070) of Division 3 are eligible to be employed at the apprentice wage rate on public works. The employment and training of each apprentice shall be in accordance with either of the following:
(1) The apprenticeship standards and apprentice agreements under which he or she is training. (2) The rules and regulations of the California Apprenticeship Council. (d) If the contractor to whom the contract is awarded by the state or any political subdivision, in performing any of the work under the contract, employs workers in any apprenticeable craft or trade, the contractor shall employ apprentices in at least the ratio set forth in this section and may apply to any apprenticeship program in the craft or trade that can provide apprentices to the site of the public work for a certificate approving the contractor under the apprenticeship standards for the employment and training of apprentices in the area or industry affected. However, the decision of the apprenticeship program to approve or deny a certificate shall be subject to review by the Administrator of Apprenticeship. The apprenticeship program or programs, upon approving the contractor, shall arrange for the dispatch of apprentices to the contractor. A contractor covered by an apprenticeship program's standards shall not be required to submit any additional application in order to include additional public works contracts under that program. “Apprenticeable craft or trade,” as used in this section, means a craft or trade determined as an apprenticeable occupation in accordance with rules and regulations prescribed by the California Apprenticeship Council. As used in this section, “contractor” includes any subcontractor under a contractor who performs any public works not excluded by subdivision (o).
(e) Before commencing work on a contract for public works, every contractor shall submit contract award information to an applicable apprenticeship program that can supply apprentices to the site of the public work.

The information submitted shall include an estimate of journeyman hours to be performed under the contract, the number of apprentices proposed to be employed, and the approximate dates the apprentices would be employed. A copy of this information shall also be submitted to the awarding body, if requested by the awarding body. Within 60 days after concluding work on the contract, each contractor and subcontractor shall submit to the awarding body, if requested, and to the apprenticeship program a verified statement of the journeyman and apprentice hours performed on the contract. The information under this subdivision shall be public. The apprenticeship programs shall retain this information for 12 months. (f) The apprenticeship program supplying apprentices to the area of the site of the public work shall ensure equal employment and affirmative action in apprenticeship for women and minorities. (g) The ratio of work performed by apprentices to journeymen employed in a particular craft or trade on the public work may be no higher than the ratio stipulated in the apprenticeship standards under which the apprenticeship program operates if the contractor agrees to be bound by those standards. However, except as otherwise provided in this section, in no case shall the ratio be less than one hour of apprentice work for every five hours of journeyman work.
(h) This ratio of apprentice work to journeyman work shall apply during any day or portion of a day when any journeyman is employed at the jobsite and shall be computed on the basis of the hours worked during the day by journeymen so employed. Any work performed by a journeyman in excess of eight hours per day or 40 hours per week shall not be used to calculate the ratio. The contractor shall employ apprentices for the number of hours computed as above before the end of the contract or, in the case of a subcontractor, before the end of the subcontract. However, the contractor shall endeavor, to the greatest extent possible, to employ apprentices during the same time period that the journeymen in the same craft or trade are employed at the jobsite. When an hourly apprenticeship ratio is not feasible for a particular craft or trade, the Administrator 340
Attachment No. 1

Page 11 of 13 ends

of Apprenticeship, upon application of an apprenticeship program, may order a minimum ratio of not less than one apprentice for each five journeymen in a craft or trade classification. (i) A contractor covered by this section who has agreed to be covered by an apprenticeship program's standards upon the issuance of the approval certificate, or who has been previously approved for an apprenticeship program in the craft or trade, shall employ the number of apprentices or the ratio of apprentices to journeymen stipulated in the applicable apprenticeship standards, but in no event less than the 1-to-5 ratio required by subdivision (g).
(j) Upon proper showing by a contractor that he or she employs apprentices in a particular craft or trade in the state on all of his or her contracts on an annual average of not less than one hour of apprentice work for every five hours of labor performed by journeymen, the Administrator of Apprenticeship may grant a certificate exempting the contractor from the 1-to-5 hourly ratio, as set forth in this section for that craft or trade. (k) An apprenticeship program has the discretion to grant to a participating contractor or contractor association a certificate, which shall be subject to the approval of the Administrator of Apprenticeship, exempting the contractor from the 1-to-5 ratio set forth in this section when it finds that any one of the following conditions is met:
(1) Unemployment for the previous three-month period in the area exceeds an average of 15 percent. (2) The number of apprentices in training in the area exceeds a ratio of 1 to 5. (3) There is a showing that the apprenticeable craft or trade is replacing at least one-thirtieth of its journeymen annually through apprenticeship training, either on a statewide basis or on a local basis. (4) Assignment of an apprentice to any work performed under a public works contract would create a condition that would jeopardize his or her life or the life, safety, or property of fellow employees or the public at large, or the specific task to which the apprentice is to be assigned is of a nature that training cannot be provided by a journeyman.
(l) If an exemption is granted pursuant to subdivision (k) to an organization that represents contractors in a specific trade from the 1-to-5 ratio on a local or statewide basis, the member contractors shall not be required to submit individual applications for approval to local joint apprenticeship committees, if they are already covered by the local apprenticeship standards.
(m)(1) A contractor to whom a contract is awarded, who, in performing any of the work under the contract, employs journeymen or apprentices in any apprenticeable craft or trade shall contribute to the California Apprenticeship Council the same amount that the director determines is the prevailing amount of apprenticeship training contributions in the area of the public works site. A contractor may take as a credit for payments to the council any amounts paid by the contractor to an approved apprenticeship program that can supply apprentices to the site of the public works project. The contractor may add the amount of the contributions in computing his or her bid for the contract. (2)(A) At the conclusion of the 2002-03 fiscal year and each fiscal year thereafter, the California Apprenticeship Council shall distribute training contributions received by the council under this subdivision, less the expenses of the Department of Industrial Relations for administering this subdivision, by making grants to approved apprenticeship programs for the purpose of training apprentices. The grant funds shall be distributed as follows:
341
Attachment No. 1

Page 12 of 13 ends

(i) If there is an approved multiemployer apprenticeship program serving the same craft or trade and geographic area for which the training contributions were made to the council, a grant to that program shall be made.
(ii) If there are two or more approved multiemployer apprenticeship programs serving the same craft or trade and county for which the training contributions were made to the council, the grant shall be divided among those programs based on the number of apprentices from that county registered in each program. (iii) All training contributions not distributed under clauses (i) and (ii) shall be used to defray the future expenses of the Department of Industrial Relations for the administration and enforcement of apprenticeship and preapprenticeship standards and requirements under this code. (B) An apprenticeship program shall only be eligible to receive grant funds pursuant to this subdivision if the apprenticeship program agrees, prior to the receipt of any grant funds, to keep adequate records that document the expenditure of grant funds and to make all records available to the Department of Industrial Relations so that the Department of Industrial Relations is able to verify that grant funds were used solely for training apprentices. For purposes of this subparagraph, adequate records include, but are not limited to, invoices, receipts, and canceled checks that account for the expenditure of grant funds. This subparagraph shall not be deemed to require an apprenticeship program to provide the Department of Industrial Relations with more documentation than is necessary to verify the appropriate expenditure of grant funds made pursuant to this subdivision.
(C) The Department of Industrial Relations shall verify that grants made pursuant to this subdivision are used solely to fund training apprentices. If an apprenticeship program is unable to demonstrate how grant funds are expended or if an apprenticeship program is found to be using grant funds for purposes other than training apprentices, then the apprenticeship program shall not be eligible to receive any future grant pursuant to this subdivision and the Department of Industrial Relations may initiate the process to rescind the registration of the apprenticeship program.
(3) All training contributions received pursuant to this subdivision shall be deposited in the Apprenticeship Training Contribution Fund, which is hereby created in the State Treasury. Upon appropriation by the Legislature, all moneys in the Apprenticeship Training Contribution Fund shall be used for the purpose of carrying out this subdivision and to pay the expenses of the Department of Industrial Relations. (n) The body awarding the contract shall cause to be inserted in the contract stipulations to effectuate this section. The stipulations shall fix the responsibility of compliance with this section for all apprenticeable occupations with the prime contractor.
(o) This section does not apply to contracts of general contractors or to contracts of specialty contractors not bidding for work through a general or prime contractor when the contracts of general contractors or those specialty contractors involve less than thirty thousand dollars ($30,000). (p) An awarding body that implements an approved labor compliance program in accordance with subdivision (b) of Section 1771.5 may, with the approval of the director, assist in the enforcement of this section under the terms and conditions prescribed by the director.

Section 1813. Forfeiture for violations; contract stipulation; report of violations The contractor or subcontractor shall, as a penalty to the state or political subdivision on whose behalf the contract is made or awarded, forfeit twenty- five dollars ($25) for each worker employed in the execution of 342
Attachment No. 1

Page 13 of 13 ends

the contract by the respective contractor or subcontractor for each calendar day during which the worker is required or permitted to work more than 8 hours in any one calendar day and 40 hours in any one calendar week in violation of the provisions of this article. In awarding any contract for public work, the awarding body shall cause to be inserted in the contract a stipulation to this effect. The awarding body shall take cognizance of all violations of this article committed in the course of the execution of the contract, and shall report them to the Division of Labor Standards Enforcement.

Section 1815. Overtime
Notwithstanding the provisions of Sections 1810 to 1814, inclusive, of this code, and notwithstanding any stipulation inserted in any contract pursuant to the requirements of said sections, work performed by employees of contractors in excess of 8 hours per day, and 40 hours during any one week, shall be permitted upon public work upon compensation for all hours worked in excess of 8 hours per day at not less than 1 ½ times the basic rate of pay.
343
Attachment No. 2

Page 1 of 3 ends

ATTACHMENT NO. 2
CALIFORNIA PUBLIC CONTRACT CODE SECTION 9204
Section 9204. Legislative findings and declarations regarding timely and complete payment of contractors for public works projects; claims process (Eff: January 1, 2017) (a) The Legislature finds and declares that it is in the best interests of the state and its citizens to ensure that all construction business performed on a public works project in the state that is complete and not in dispute is paid in full and in a timely manner.
(b) Notwithstanding any other law, including, but not limited to, Article 7.1 (commencing with Section 10240) of Chapter 1 of Part 2, Chapter 10 (commencing with Section 19100) of Part 2, and Article 1.5 (commencing with Section 20104) of Chapter 1 of Part 3, this section shall apply to any claim by a contractor in connection with a public works project.
(c) For purposes of this section:
(1) “Claim” means a separate demand by a contractor sent by registered mail or certified mail with return receipt requested, for one or more of the following:
(A) A time extension, including, without limitation, for relief from damages or penalties for delay assessed by a public entity under a contract for a public works project. (B) Payment by the public entity of money or damages arising from work done by, or on behalf of, the contractor pursuant to the contract for a public works project and payment for which is not otherwise expressly provided or to which the claimant is not otherwise entitled. (C) Payment of an amount that is disputed by the public entity. (2) “Contractor” means any type of contractor within the meaning of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code who has entered into a direct contract with a public entity for a public works project.
(3)(A) “Public entity” means, without limitation, except as provided in subparagraph (B), a state agency, department, office, division, bureau, board, or commission, the California State University, the University of California, a city, including a charter city, county, including a charter county, city and county, including a charter city and county, district, special district, public authority, political subdivision, public corporation, or nonprofit transit corporation wholly owned by a public agency and formed to carry out the purposes of the public agency.
(B) “Public entity” shall not include the following:
(i) The Department of Water Resources as to any project under the jurisdiction of that department. (ii) The Department of Transportation as to any project under the jurisdiction of that department. (iii) The Department of Parks and Recreation as to any project under the jurisdiction of that department. (iv) The Department of Corrections and Rehabilitation with respect to any project under its jurisdiction pursuant to Chapter 11 (commencing with Section 7000) of Title 7 of Part 3 of the Penal Code. 344
Attachment No. 2

Page 2 of 3 ends

(v) The Military Department as to any project under the jurisdiction of that department. (vi) The Department of General Services as to all other projects. (vii) The High-Speed Rail Authority.
(4) “Public works project” means the erection, construction, alteration, repair, or improvement of any public structure, building, road, or other public improvement of any kind. (5) “Subcontractor” means any type of contractor within the meaning of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code who either is in direct contract with a contractor or is a lower tier subcontractor.
(d)(1)(A) Upon receipt of a claim pursuant to this section, the public entity to which the claim applies shall conduct a reasonable review of the claim and, within a period not to exceed 45 days, shall provide the claimant a written statement identifying what portion of the claim is disputed and what portion is undisputed. Upon receipt of a claim, a public entity and a contractor may, by mutual agreement, extend the time period provided in this subdivision.
(B) The claimant shall furnish reasonable documentation to support the claim. (C) If the public entity needs approval from its governing body to provide the claimant a written statement identifying the disputed portion and the undisputed portion of the claim, and the governing body does not meet within the 45 days or within the mutually agreed to extension of time following receipt of a claim sent by registered mail or certified mail, return receipt requested, the public entity shall have up to three days following the next duly publicly noticed meeting of the governing body after the 45-day period, or extension, expires to provide the claimant a written statement identifying the disputed portion and the undisputed portion. (D) Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. If the public entity fails to issue a written statement, paragraph (3) shall apply.
(2)(A) If the claimant disputes the public entity’s written response, or if the public entity fails to respond to a claim issued pursuant to this section within the time prescribed, the claimant may demand in writing an informal conference to meet and confer for settlement of the issues in dispute. Upon receipt of a demand in writing sent by registered mail or certified mail, return receipt requested, the public entity shall schedule a meet and confer conference within 30 days for settlement of the dispute. (B) Within 10 business days following the conclusion of the meet and confer conference, if the claim or any portion of the claim remains in dispute, the public entity shall provide the claimant a written statement identifying the portion of the claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. Any disputed portion of the claim, as identified by the contractor in writing, shall be submitted to nonbinding mediation, with the public entity and the claimant sharing the associated costs equally. The public entity and claimant shall mutually agree to a mediator within 10 business days after the disputed portion of the claim has been identified in writing. If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the claim. Each party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator. If mediation is unsuccessful, the parts of the claim remaining in dispute shall be subject to applicable procedures outside this section. 345
Attachment No. 2

Page 3 of 3 ends

(C) For purposes of this section, mediation includes any nonbinding process, including, but not limited to, neutral evaluation or a dispute review board, in which an independent third party or board assists the parties in dispute resolution through negotiation or by issuance of an evaluation. Any mediation utilized shall conform to the timeframes in this section.
(D) Unless otherwise agreed to by the public entity and the contractor in writing, the mediation conducted pursuant to this section shall excuse any further obligation under Section 20104.4 to mediate after litigation has been commenced.
(E) This section does not preclude a public entity from requiring arbitration of disputes under private arbitration or the Public Works Contract Arbitration Program, if mediation under this section does not resolve the parties’ dispute.
(3) Failure by the public entity to respond to a claim from a contractor within the time periods described in this subdivision or to otherwise meet the time requirements of this section shall result in the claim being deemed rejected in its entirety. A claim that is denied by reason of the public entity’s failure to have responded to a claim, or its failure to otherwise meet the time requirements of this section, shall not constitute an adverse finding with regard to the merits of the claim or the responsibility or qualifications of the claimant. (4) Amounts not paid in a timely manner as required by this section shall bear interest at 7 percent per annum. (5) If a subcontractor or a lower tier subcontractor lacks legal standing to assert a claim against a public entity because privity of contract does not exist, the contractor may present to the public entity a claim on behalf of a subcontractor or lower tier subcontractor. A subcontractor may request in writing, either on their own behalf or on behalf of a lower tier subcontractor, that the contractor present a claim for work which was performed by the subcontractor or by a lower tier subcontractor on behalf of the subcontractor. The subcontractor requesting that the claim be presented to the public entity shall furnish reasonable documentation to support the claim. Within 45 days of receipt of this written request, the contractor shall notify the subcontractor in writing as to whether the contractor presented the claim to the public entity and, if the original contractor did not present the claim, provide the subcontractor with a statement of the reasons for not having done so. (e) The text of this section or a summary of it shall be set forth in the plans or specifications for any public works project that may give rise to a claim under this section. (f) A waiver of the rights granted by this section is void and contrary to public policy, provided, however, that (1) upon receipt of a claim, the parties may mutually agree to waive, in writing, mediation and proceed directly to the commencement of a civil action or binding arbitration, as applicable; and (2) a public entity may prescribe reasonable change order, claim, and dispute resolution procedures and requirements in addition to the provisions of this section, so long as the contractual provisions do not conflict with or otherwise impair the timeframes and procedures set forth in this section. (g) This section applies to contracts entered into on or after January 1, 2017. (h) Nothing in this section shall impose liability upon a public entity that makes loans or grants available through a competitive application process, for the failure of an awardee to meet its contractual obligations. (i) This section shall remain in effect only until January 1, 2027, and as of that date is repealed, unless a later enacted statute, that is enacted before January 1, 2027, deletes or extends that date. 346
City of Orange: Summary of Bid Abstracts for:
1 2
Bid No. 21-22.32
Date of Bid Opening: 5/19/2022
Tel. No. 714-560-5151 Tel. No. 503-625-3770
NO. DESCRIPTION OF WORK QUANTITY UNIT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT 1 Furnishing all labor, equipment, services,
transportation, and certain materials
necessary to deliver liquid Sodium
Hypochlorite 12.5%, NFS 60 to 13 city
wells and 3 reservoir sites within the City
of Orange for FY 22-23.
90,000 GAL 1.90 $ $171,000.00 $2.08 $187,161.75 $5.09 $457,920.00 $171,000.00 $187,161.75 $457,920.00
Purchase of Liquid Sodium Hypochlorite
ENGINEER'S ESTIMATE Waterline Technologies, Inc. Pacific Star Chemical

Page 1 of 1 ends

Agenda Item
City Council
Item #: 3.30. 6/14/2022 File #: 22-0323
TO: Honorable Mayor and Members of the City Council
THRU: Rob Houston, City Manager
FROM: Christopher Cash, Public Works Director

1. SUBJECT
Award of Contract to American Asphalt South, Inc. for Annual Slurry Seal at Various Locations FY 22; Bid No. 21-22.35.

2. SUMMARY
Bids for the Annual Slurry Seal at Various Locations, Fiscal Year 2021-2022 (SP-4211) were received and opened on May 26, 2022. Four bidders responded to the notice inviting bids. The apparent low bidder is American Asphalt South, Inc. of Fontana, California in the amount of $514,961.

3. RECOMMENDED ACTION
Award the contract to American Asphalt South, Inc. in the total amount of $566,457, representing an original amount of $514,961 plus a 10% contingency of $51,496, for Annual Slurry Seal at Various Locations, Fiscal Year 2021-2022, and authorize the Mayor and City Clerk to execute on behalf of the City.

4. FISCAL IMPACT
The total expenditure for this contract is $566,457 and will be funded in Pavement Management Program (13120) through:

Road Maintenance Rehabilitation Account (274) $421,036
Measure M2 (263) 145,421
Total $566,457

5. STRATEGIC PLAN GOALS
Goal 1: Provide for a safe community
b: Provide and maintain infrastructure necessary to ensure the safety of the public.

Goal 4: Provide outstanding public service
b: Provide facilities and services to meet customer expectations.

6. DISCUSSION AND BACKGROUND
The Annual Slurry Seal Project at Various Locations Fiscal Year 2021-2022 (FY 22) is part of the City’s ongoing Annual Street Maintenance activities and is designed to prolong pavement life of City streets. Rehabilitation methods vary depending on the sustained damage, but in general consist of localized areas of pavement reconstruction as needed and slurry seal. The rehabilitated pavement City of Orange Page 1 of 2 Printed on 6/9/2022
powered by Legistar™348
Item #: 3.30. 6/14/2022 File #: 22-0323
localized areas of pavement reconstruction as needed and slurry seal. The rehabilitated pavement will have a longer service life and will provide a safe and smooth ride for the public.

This slurry seal project will include local streets throughout the City. The streets are selected for maintenance in accordance with our Pavement Management Plan, generally fall into the “fair” category, and require work at this time to prevent pavement deterioration and avoid a higher cost for asphalt concrete overlay in the future. Several streets were also added due to hydraulic leaks from CR&R trash trucks that need to be remediated, and staff is working with CR&R to recover the repair cost. The work includes local dig out repairs, slurry seal, signing and striping.

The City Council previously approved advertisement for bids on April 12, 2022. The bid solicitation was advertised on May 5, 2022 for a period of three weeks and bids were opened on May 26, 2022.

Four bids were received as follows:

1. American Asphalt South, Inc. $514,961.00

2. Roy Allan Slurry Seal, Inc. $557,390.20

3. Pavement Coatings $669,700.00

4. All American Asphalt $819,000.00
The low bid is about 20% higher than the Engineer’s Estimate of $421,000 for the project. This is likely due to increases in labor costs and prices of materials. The City has worked with American Asphalt South, Inc. in the past and found them to be acceptable, with adequate years of experience in completing contracts of similar nature to this project. Therefore, staff recommends that American Asphalt South, Inc. be awarded the contract in the amount of $566,457, representing an original amount of $514,961 plus a 10% contingency of $51,496 for Annual Slurry Maintenance at Various Locations FY 22.

This project is part of the City’s ongoing Capital Improvement Program. This project will be funded in FY 22 Pavement Management Program (13120).

The proposed project is categorically exempt from the provisions of the California Environmental Quality Act (CEQA) under CEQA guidelines Section 15301 “Existing Facilities” Class 1 (c). The CEQA Notice of Exemption was filed with the County Recorder’s Office.

Construction is scheduled to begin in August 2022 and is expected to be completed within 60 calendar days.

7. ATTACHMENTS
· Bid Abstract
· Contract with American Asphalt South, Inc.
· Location Maps
City of Orange Page 2 of 2 Printed on 6/9/2022
powered by Legistar™349
Agenda Item
City Council
Item #: 3.30. 6/14/2022 File #: 22-0323
TO: Honorable Mayor and Members of the City Council
THRU: Rob Houston, City Manager
FROM: Christopher Cash, Public Works Director

1. SUBJECT
Award of Contract to American Asphalt South, Inc. for Annual Slurry Seal at Various Locations FY 22; Bid No.21-22.35.

2. SUMMARY
Bids for the Annual Slurry Seal at Various Locations, Fiscal Year 2021-2022 (SP-4211) were received and opened on May 26, 2022. Four bidders responded to the notice inviting bids. The apparent low bidder is American Asphalt South, Inc. of Fontana, California in the amount of $514,961.

3. RECOMMENDED ACTION
Award the contract to American Asphalt South, Inc. in the total amount of $566,457, representing an original amount of $514,961 plus a 10% contingency of $51,496, for Annual Slurry Seal at Various Locations, Fiscal Year 2021-2022, and authorize the Mayor and City Clerk to execute on behalf of the City.

4. FISCAL IMPACT
The total expenditure for this contract is $566,457 and will be funded in Pavement Management Program (13120) through:

Road Maintenance Rehabilitation Account (274) $421,036
Measure M2 (263) 145,421
Total $566,457

5. STRATEGIC PLAN GOALS
Goal 1: Provide for a safe community
b: Provide and maintain infrastructure necessary to ensure the safety of the public.

Goal 4: Provide outstanding public service
b: Provide facilities and services to meet customer expectations.

6. DISCUSSION AND BACKGROUND
The Annual Slurry Seal Project at Various Locations Fiscal Year 2021-2022 (FY 22) is part of the City’s ongoing Annual Street Maintenance activities and is designed to prolong pavement life of City streets. Rehabilitation methods vary depending on the sustained damage, but in general consist of localized areas of pavement reconstruction as needed and slurry seal. The rehabilitated pavement City of Orange Page 1 of 2 Printed on 6/9/2022
powered by Legistar™350
Item #: 3.30. 6/14/2022 File #: 22-0323
localized areas of pavement reconstruction as needed and slurry seal. The rehabilitated pavement will have a longer service life and will provide a safe and smooth ride for the public.

This slurry seal project will include local streets throughout the City. The streets are selected for maintenance in accordance with our Pavement Management Plan, generally fall into the “fair” category, and require work at this time to prevent pavement deterioration and avoid a higher cost for asphalt concrete overlay in the future. Several streets were also added due to hydraulic leaks from CR&R trash trucks that need to be remediated, and staff is working with CR&R to recover the repair cost. The work includes local dig out repairs, slurry seal, signing and striping.

The City Council previously approved advertisement for bids on April 12, 2022. The bid solicitation was advertised on May 5, 2022 for a period of three weeks and bids were opened on May 26, 2022.

Four bids were received as follows:

1. American Asphalt South, Inc. $514,961.00

2. Roy Allan Slurry Seal, Inc. $557,390.20

3. Pavement Coatings $669,700.00

4. All American Asphalt $819,000.00
The low bid is about 20% higher than the Engineer’s Estimate of $421,000 for the project. This is likely due to increases in labor costs and prices of materials. The City has worked with American Asphalt South, Inc. in the past and found them to be acceptable, with adequate years of experience in completing contracts of similar nature to this project. Therefore, staff recommends that American Asphalt South, Inc. be awarded the contract in the amount of $566,457, representing an original amount of $514,961 plus a 10% contingency of $51,496 for Annual Slurry Maintenance at Various Locations FY 22.

This project is part of the City’s ongoing Capital Improvement Program. This project will be funded in FY 22 Pavement Management Program (13120).

The proposed project is categorically exempt from the provisions of the California Environmental Quality Act (CEQA) under CEQA guidelines Section 15301 “Existing Facilities” Class 1 (c). The CEQA Notice of Exemption was filed with the County Recorder’s Office.

Construction is scheduled to begin in August 2022 and is expected to be completed within 60 calendar days.

7. ATTACHMENTS
· Bid Abstract
· Contract with American Asphalt South, Inc.
· Location Maps
City of Orange Page 2 of 2 Printed on 6/9/2022
powered by Legistar™351
5/26/22, 2:32 PM Bid Evaluation
https://bid.questcdn.com/questbid/worksheets/BidWorksheetQAPEval.html?jobNo=8193746 1/1 Chris Mielke
Contact Quest
Logout
Providing State-of-the-Art Bid Management Systems for Public Construction, RFPs, and General Goods & Services Procurement since 1999 Home
Bid Requirements
Bid Letting
Item Codes
Annual Slurry Seal at Various Locations, FY21-22 (#8193746) Owner: Orange CA, City of
Solicitor: Orange CA, City of
05/26/2022 02:00 PM PDT
Show Evaluation Options
Sections shown in this color are not included in the Base Bid Total - Mandatory completion Sections shown in this color are not included in the Base Bid Total - Optional completion Sections shown in this color are fixed and cannot be edited by the bidder Post Prelim Bid Tabs Export to CSV Done
American Asphalt South,
Inc.

Roy Allan Slurry Seal, Inc. Pavement Coatings All American Asphalt ONLINE Docs ONLINE Docs ONLINE Docs ONLINE Docs
Accepted Accepted Accepted Accepted
Line Item Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Extension Base Bid Total: $514,961.00 $557,390.20 $669,700.00 $819,000.00 352

CONTRACT
[Annual Slurry Seal at Various Locations FY 21-22 (Bid No. 21-22.35; SP-4211)] THIS CONTRACT (the “Contract”) is made and entered into as of ______________, 2022 (“Effective Date”) by and between the CITY OF ORANGE, a municipal corporation (“City”), and AMERICAN ASPHALT SOUTH, INC., a California corporation (“Contractor”), who agree as follows.

ARTICLE 1
Work Performed
a. For and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by City, and under the conditions expressed in the two (2) bonds presented to City with this Contract and incorporated herein by this reference, Contractor hereby agrees to and shall do all the work and furnish all the labor, materials, tools and equipment, except such as are mentioned in the specifications to be furnished by City to Contractor, necessary to complete in good workmanship and substantial manner the work (the “Work”) described in:
(1) The latest edition of the "City of Orange Standard Plans and Specifications" (the “Orange Book”) with the term "Engineer," as used in the Orange Book and in this Contract, to specifically include the City Engineer (or his/her designee); (2) The "Standard Specifications for Public Works Construction” (the “Green Book”), and all amendments thereto, except the definition of “Subcontractor” in Section 1.2 (General – Terms and Definitions) of Part 1 (General Provisions) of the Green Book, which is hereby amended in its entirety to read as follows: “Subcontractor – An individual, firm, or corporation having a direct contract with the Contractor for the performance of a part of the Work;” (3) The “City of Orange Standard Special Provisions;”
(4) The Standard Plans; and
(5) Contractor’s Bid Proposal, which is on file with City’s Department of Public Works.
b. Contractor acknowledges that it has received the Plans from City and that a complete copy of the Plans are in its possession and are hereby specifically referred to and by such reference made a part hereof. The Orange Book, Green Book and City of Orange Standard Special Provisions and Standard Plans are on file with City’s Public Works Director and are hereby specifically referred to and by such reference made a part hereof. Contractor hereby acknowledges that it has read, reviewed and understands the Plans, the Orange Book, the Green Book, the Special Provisions, the Standard Plans, and the Encroachment Permit as they relate to the Work, all of which documents shall be referred to herein collectively as the “Plans and Specifications.” 353
2 c. Contractor acknowledges the provisions of Chapter 8.28 of the Orange Municipal Code which requires, among other things, that Contractor utilize City’s exclusive solid waste hauler for the rental of bins for trash and debris removal and imposes mandatory recycling requirements for self-hauled construction and demolition waste. The terms and conditions set forth in this Contract shall control over any terms and conditions in the Plans and Specifications to the contrary.
d. The Work shall be performed in conformity with the Plans and Specifications and the Bid Proposal and all applicable laws, including any and all applicable federal and state labor laws and standards and applicable prevailing wage requirements and any and all state, federal and local statutes, regulations and ordinances relating to the protection of human health or the environment.
e. Unless and until otherwise notified in writing by City’s Public Works Director, City’s Principal Engineer, Randy Nguyen (“Authorized City Representative”), shall be the person to whom Contractor will report for the performance of the Work hereunder. It is understood that Contractor’s performance hereunder shall be under the direction and supervision of the Authorized City Representative or such other person as City’s Public Works Director may designate from time to time, that Contractor shall coordinate the Work hereunder with the Authorized City Representative to the extent required by the Authorized City Representative, and that all performances required hereunder by Contractor shall be performed to the satisfaction of the Authorized City Representative or City’s Public Works Director. f. It is expressly agreed by and between the parties hereto that should there be any conflict between the terms of this instrument and Contractor’s Bid Proposal, then this instrument shall control and nothing herein shall be considered as an acceptance of the said terms of said Bid Proposal conflicting herewith.

ARTICLE 2
Commencement of Work
Contractor shall commence the Work provided for in this Contract within ten (10) days of the date of the issuance by City of a Notice to Proceed and diligently prosecute completion of the Work within sixty (60) calendar days from such date, unless legal extension is granted in accordance with the terms set forth in the Green Book. Time is of the essence in this Contract.

Contractor shall do all things necessary and incidental to the prosecution of Contractor's Work.

ARTICLE 3
Compensation
a. Contractor agrees to receive and accept an amount not to exceed FIVE HUNDRED FOURTEEN THOUSAND NINE HUNDRED SIXTY-ONE DOLLARS and 00/100 ($514,961.00) unless said amount is amended by Contract Change Order approved by the City, as compensation for furnishing all materials and doing all the Work contemplated and embraced in this Contract. Said compensation covers (1) all loss or damage arising out of the nature of the Work, from the acts of the elements; (2) any unforeseen difficulties or obstructions which may 354
3 arise or be encountered in the prosecution of the Work until its acceptance by City, other than as provided below; (3) all risks of every description connected with the Work; (4) all expenses incurred by or in consequence of the suspension or discontinuance of the Work; and (5) well and faithfully completing the Work, and for the whole thereof, in the manner and according to the Plans and Specifications, and requirements of the Authorized City Representative under them.

Retention amounts shall be withheld from progress payments as required by law unless Contractor provides securities in lieu of retention.
b. In addition to the scheduled Work to be performed by the Contractor, the parties recognize that additional, unforeseen work and services may be required by the Authorized City Representative. In anticipation of such contingencies, the sum of FIFTY-ONE THOUSAND FOUR HUNDRED NINETY-SIX DOLLARS and 00/100 ($51,496.00) has been added to the total compensation of this Contract. The Authorized City Representative may approve the additional work and the actual costs incurred by the Contractor in performance of additional work or services in accordance with such amount as the Authorized City Representative and the Contractor may agree upon in advance. Said additional work or services and the amount of compensation therefor, up to the amount of the authorized contingency, shall be memorialized in the form of a Contract Amendment approved by the City Manager on a form acceptable to the City Attorney. The Contractor agrees to perform only that work or those services that are specifically requested by the Authorized City Representative. Any and all additional work and services performed under this Contract shall be completed in such sequence as to assure their completion as expeditiously as is consistent with professional skill and care in accordance with a cost estimate or proposal submitted to and approved by the Authorized City Representative prior to the commencement of such Work or services.
c. The total amount of compensation under this Contract, including contingencies, shall not exceed FIVE HUNDRED SIXTY-SIX THOUSAND FOUR HUNDRED FIFTY-SEVEN DOLLARS and 00/100 ($566,457.00).

ARTICLE 4
Licenses
Contractor represents that it and any subcontractors it may engage, possess any and all licenses which are required under state or federal law to perform the Work contemplated by this Contract and that Contractor and subcontractors shall maintain all appropriate licenses, including a City of Orange business license, at its cost, during the performance of this Contract.

ARTICLE 5
Guarantees
a. Contractor guarantees the construction and installation of all Work included in the Plans and Specifications for which Contractor has been awarded this Contract. b. Should any of the materials or equipment installed pursuant to this Contract prove defective or should the Work as a whole prove defective, due to faulty equipment, workmanship, materials furnished or methods of installations, or should said Work or any part thereof fail to 355
4 function properly, as designed, due to any of the above causes within twelve (12) months after the date on which said Work is accepted by City, Contractor shall make repairs and furnish such materials and equipment as are necessary to be furnished and installed within fifteen (15) calendar days after the receipt of a demand from City.
c. Said Work will be deemed defective within the meaning of this guarantee in the event that it fails to function as originally intended either by the Plans and Specifications of this Contract or by the manufacturer(s) of the equipment incorporated into the Work. d. In the event repairs are not made within fifteen (15) calendar days after Contractor's receipt of a demand from City, City shall have the unqualified option to make any needed repairs or replacements itself or by any other contractor. Contractor shall reimburse City, upon demand, for all expenses incurred in restoring said Work to the condition contemplated in this Contract, including the cost of any equipment or materials replaced. e. It is understood that emergency repairs may, by necessity, be made by City.

Therefore, when defective equipment, materials or workmanship result in emergency repairs by City, Contractor shall reimburse City, upon demand, for all expenses incurred. Emergency repairs will be deemed as those repairs determined by City’s Director of Public Works to be necessary due to an immediate detriment to the health, safety, welfare or convenience of the residents of City.

ARTICLE 6
Water Quality
a. The Santa Ana Regional Water Quality Control Board (“RWQCB”) has issued National Pollutant Discharge Elimination System (“NPDES”) Permit No. R8-2009-0030 (the “Permit”), which governs storm water and non-storm water discharges resulting from municipal activities performed by City or its contractors. In order to comply with the Permit requirements, the County of Orange has prepared a Drainage Area Management Plan (“DAMP”), containing Model Maintenance Procedures with Best Management Practices (“BMPs”) that City and its contractors must adhere to. The Model Maintenance Procedures contain pollution prevention and source control techniques to minimize the impact of those activities upon dry-weather urban runoff, storm water runoff, and receiving water quality. Examples include: wash water from cleaning of sidewalks or parking lots must be collected and disposed of in the sewer or landscaped areas.
b. The Permit, the DAMP and the Model Maintenance Procedures are on file in the office of City’s Director of Public Works. Contractor hereby acknowledges that it has read, reviewed and understands the Permit, the DAMP and the Model Maintenance Procedures, as they relate to the Work and hereby shall perform the Work in conformance therewith.

ARTICLE 7
Independent Contractor; Contractor not Agent
a. At all times during the term of this Contract, Contractor shall be an independent contractor and not an employee of City. City shall have the right to control Contractor only insofar as the result of Contractor’s services rendered pursuant to this Contract. City shall not have the 356
5 right to control the means by which Contractor accomplishes services rendered pursuant to this Contract. Contractor shall, at its sole cost and expense, furnish all facilities, materials and equipment which may be required for furnishing services pursuant to this Contract. Contractor shall be solely responsible for, and shall indemnify, defend and save City harmless from all matters relating to the payment of its subcontractors, agents and employees, including compliance with social security, withholding and all other wages, salaries, benefits, taxes, exactions, and regulations of any nature whatsoever. Contractor acknowledges that Contractor and any subcontractors, agents or employees employed by Contractor shall not, under any circumstances, be considered employees of City, and that they shall not be entitled to any of the benefits or rights afforded employees of City, including, but not limited to, sick leave, vacation leave, holiday pay, Public Employees Retirement System benefits, or health, life, dental, long-term disability or workers' compensation insurance benefits.
b. Except as City may specify in writing, Contractor shall have no authority, express or implied, to act on behalf of City in any capacity whatsoever as an agent. Contractor shall have no authority, express or implied, to bind City to any obligation whatsoever.

ARTICLE 8
Public Work; Prevailing Wage
a. The Work which is the subject of this Contract is a “public work,” as that term is defined in Section 1720 of the California Labor Code, for which prevailing wages must be paid.

To the extent Contractor’s employees will perform any work that falls within any of the classifications for which the Department of Labor Relations of the State of California promulgates prevailing wage determinations, Contractor hereby agrees that Contractor, and any subcontractor under it, shall pay not less than the specified prevailing rates of wages to all such workers. The general prevailing wage determinations for crafts can be located on the website of the Department of Industrial Relations (www.dir.ca.gov/DLSR). Additionally, to perform work under this Contract, Contractor must meet all State registration requirements and criteria, including project compliance monitoring.
b. Attached hereto as Attachment No. 1 and incorporated herein by this reference is a copy of the provisions of Sections 1725.5, 1771, 1771.1, 1771.4, 1775, 1776, 1777.5, 1813 and 1815 of the California Labor Code. Contractor hereby acknowledges that it has read, reviewed and understands those provisions of the Labor Code and shall prosecute and complete the Work under this Contract in strict compliance with all of those terms and provisions. c. Contractor shall secure the payment of compensation to its employees in accordance with the provisions of Section 3700 of the California Labor Code. Accordingly, and as required by Section 1861 of the California Labor Code, Contractor hereby certifies as follows:
“I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract.”
357
6 d. Contractor shall indemnify, protect, defend and hold harmless City and its officers, employees, contractors and agents, with counsel reasonably acceptable to City, from and against any and all loss, liability, damage, claim, cost, expense, and/or “increased costs” (including reasonable attorney’s fees, court and litigation costs, and fees of expert witnesses) which result or arise in any way from the noncompliance by Contractor of any applicable local, state and/or federal law, including, without limitation, any applicable federal and/or state labor laws (including, without limitation, the requirement to pay state prevailing wages). It is agreed by the parties that, in connection with the construction of the Work which is the subject of this Contract, Contractor shall bear all risks of payment or non-payment of state prevailing wages. “Increased costs” as used in this paragraph shall have the meaning ascribed to it in Labor Code Section 1781, as the same may be enacted, adopted or amended from time to time. The foregoing indemnity shall survive termination of this Contract.

ARTICLE 9
Equal Employment Opportunity
During the performance of this Contract, Contractor agrees as follows:
a. Contractor shall not discriminate against any employee or applicant for employment because of race, color, religion, sex, national origin, mental or physical disability, or any other basis prohibited by applicable law. Contractor shall ensure that applicants are employed and that employees are treated during employment, without regard to their race, color, religion, sex, national origin, mental or physical disability, or any other basis prohibited by applicable law.

Such actions shall include, but not be limited to the following: employment, upgrading, demotion or transfer, recruitment or recruitment advertising, layoff or termination, rates of pay or other forms of compensation and selection for training, including apprenticeship. Contractor shall post in conspicuous places, available to employees and applicants for employment, a notice setting forth provisions of this non-discrimination clause.
b. Contractor shall, in all solicitations and advertisements for employees placed by, or on behalf of Contractor, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, national origin, mental or physical disability, or any other basis prohibited by applicable law. c. Contractor shall cause the foregoing paragraphs (a) and (b) to be inserted in all subcontracts for any Work covered by this Contract, provided that the foregoing provisions shall not apply to subcontracts for standard commercial supplies or raw materials.

ARTICLE 10
Conflicts of Interest
Contractor agrees that it shall not make, participate in the making, or in any way attempt to use its position as a contractor to influence any decision of City in which Contractor knows or has reason to know that Contractor, its officers, partners, or employees have a financial interest as defined in Section 87103 of the Government Code. Contractor further agrees that it shall not be eligible to work as the builder for any project for which the design work is part of this Contract. 358
7 ARTICLE 11
Indemnity
Contractor shall defend, indemnify and hold harmless City and its officers, officials, agents, and employees from and against:
a. Any and all claims, liabilities, losses, damages, penalties, costs or expenses (including reasonable attorneys' fees and court costs) which City may directly or indirectly sustain or suffer arising from or as a result of the death of any person or any accident, injury, loss or damage whatsoever caused to any person or the property of any person which shall occur on or adjacent to the real property which is the subject of this Contract, or in connection with performance of this Contract which may be directly or indirectly caused by the acts or omissions of Contractor or its officers, employees, contractors or agents, or as a consequence of any use, generation, manufacture, storage, disposal, release or threatened release of a hazardous waste or substance. Contractor shall not be responsible for (and such indemnity shall not apply to) any willful misconduct, negligence or breach of this Contract by City or its officers, officials, agents, and employees. The foregoing indemnity shall survive termination of this Contract. b. Any and all claims under workers’ compensation acts and other employee benefit acts with respect to Contractor’s employees or Contractor’s subcontractor’s employees arising out of Contractor’s Work under this Contract, including any and all claims under any law pertaining to Contractor’s status as an independent contractor.

ARTICLE 12
Insurance
a. Contractor shall procure and maintain for the duration of this Contract insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the Work hereunder and the results of that Work by Contractor, its agents, representatives, employees or subcontractors. Any umbrella liability insurance that is provided as part of the general or automobile liability minimums set forth below shall be maintained for the duration of the Contract.
b. Contractor shall maintain the following minimum amount of insurance: the greater of either the limits set forth in (1) through (4), below; or all of the insurance coverage and/or limits carried by or available to Contractor.
(1) General Liability $2,000,000 per occurrence for bodily injury, personal injury and property damage. If
Commercial General Liability insurance
or other form with a general aggregate
limit is used, either the general aggregate
limit shall apply separately to this
project/location or the general aggregate
limit shall be twice the required
occurrence limit.
359
8 (2) Automobile Liability $1,000,000 per accident for bodily injury and property damage.
(3) Workers’ Compensation as required by the State of California. (4) Employer’s Liability $1,000,000 per accident for bodily injury or disease. c. Any insurance proceeds in excess of or broader than the minimum required coverage and/or minimum required limits which are applicable to a given loss shall be available to City. No representation is made that the minimum insurance requirements of this Contract are sufficient to cover the obligations of Contractor under this Contract. d. Any deductibles or self-insured retentions must be declared to and approved by City. At the option of City, either: the insurer shall reduce or eliminate such deductibles or selfinsured retentions with respect to City, its officers, officials, agents and employees; or Contractor shall provide a financial guarantee satisfactory to City guaranteeing payment of losses and related investigations, claim administration, and defense expenses. e. Each policy of general liability and automotive liability insurance shall contain, or be endorsed to contain, the following provisions:
(1) City, its officers, officials, agents, and employees are declared to be additional insureds under the terms of the policy, with respect to liability arising out of automobiles owned, leased, hired or borrowed by or on behalf of Contractor (any auto), and with respect to liability arising out of Work or operations performed by or on behalf of Contractor, including materials, parts or equipment furnished in connection with such Work or operations. A policy endorsement to that effect shall be provided to City along with the certificate of insurance. In lieu of an endorsement, City will accept a copy of the policy(ies) which evidences that City is an additional insured as a contracting party. The minimum coverage required by Subsection 12.b, above, shall apply to City as an additional insured.
(2) For any claims related to this Contract, Contractor’s insurance coverage shall be primary insurance with respect to City, its officers, officials, agents and employees. Any insurance or self-insurance maintained by City, its officers, officials, agents and employees shall be excess of Contractor’s insurance and shall not contribute with it. (3) Coverage shall not be canceled, except after thirty (30) days’ prior written notice has been provided to City.
f. Contractor shall furnish City with original certificates of insurance and endorsements effecting coverage required by this Article 12. The endorsements shall be on forms acceptable to City. All certificates and endorsements are to be received and approved by City before the Work commences. However, failure to do so shall not operate as a waiver of these insurance requirements. City reserves the right to require complete, certified copies of all required insurance policies, including endorsements effecting the coverage required by these specifications at any time.
360
9 g. All insurance procured and maintained by Contractor shall be issued by insurers admitted to conduct the pertinent line of insurance business in California and having a rating of Grade A or better and Class VII or better by the latest edition of Best Key Rating Guide. h. Contractor shall immediately notify City if any required insurance lapses or is otherwise modified and cease performance of this Contract unless otherwise directed by City. In such a case, City may procure insurance or self-insure the risk and charge Contractor for such costs and any and all damages resulting therefrom by way of set-off from any sums owed Contractor. i. Contractor agrees that in the event of loss due to any of the perils for which it has agreed to provide insurance, Contractor shall look solely to its insurance for recovery. Contractor hereby grants to City, on behalf of any insurer providing insurance to either Contractor or City with respect to the services of Contractor herein, a waiver of any right to subrogation which any such insurer may acquire against City by virtue of the payment of any loss under such insurance.

The Workers’ Compensation policy shall be endorsed with a waiver of subrogation in favor of City for all Work performed by Contractor, its employees, agents and subcontractors. Contractor shall obtain any other endorsement that may be necessary to effect this waiver of subrogation. j. Contractor shall require and verify that all subcontractors maintain insurance meeting all of the requirements stated herein.

ARTICLE 13
Termination
City, acting through its City Manager or his/her designee, reserves the right to terminate this Contract for any reason by giving five (5) days’ written notice of intent to terminate to Contractor. Upon receipt of notice, Contractor shall immediately cease work, unless the notice provides otherwise. Should City terminate this Contract, City shall pay Contractor for services satisfactorily provided and all allowable reimbursements incurred to the date of termination in compliance with this Contract, unless such termination shall be for cause, in which event City may withhold any disputed compensation. City shall not be liable for any claim of lost profits.

ARTICLE 14
Maintenance and Inspection of Records
In accordance with generally accepted accounting principles, Contractor and its subcontractors shall maintain reasonably full and complete books, documents, papers, accounting records and other information (collectively, the “records”) pertaining to the costs of and completion of services performed under this Contract. During the term of this Contract and for a period of three (3) years after termination or completion of this Contract, City shall have the right to inspect and/or audit Contractor's records pertaining to the performance of this Contract at Contractor's office. Contractor shall make available all such records for inspection or audit at its offices during normal business hours and upon three (3) days’ notice from City, and copies thereof shall be furnished if requested.
361
10 ARTICLE 15
Compliance with Laws
a. Contractor shall be knowledgeable of and comply with all local, state and federal laws pertaining to the subject matter hereof or in any way regulating the activities undertaken by Contractor or any subcontractor hereunder.
b. Contractor represents and warrants that it:
(1) Has complied and shall at all times during the term of this Contract comply, in all respects, with all immigration laws, regulations, statutes, rules, codes, and orders, including, without limitation, the Immigration Reform and Control Act of 1986 (IRCA); and (2) Has not and will not knowingly employ any individual to perform services under this Contract who is ineligible to work in the United States or under the terms of this Contract; and (3) Has properly maintained, and shall at all times during the term of this Contract properly maintain, all related employment documentation records including, without limitation, the completion and maintenance of the Form I-9 for each of Contractor’s employees; and (4) Has responded, and shall at all times during the term of this Contract respond, in a timely fashion to any government inspection requests relating to immigration law compliance and/or Form I-9 compliance and/or worksite enforcement by the Department of Homeland Security, the Department of Labor, or the Social Security Administration. c. Contractor shall require all subcontractors and/or subconsultants to make the same representations and warranties required by this Article 15 when hired to perform services under this Contract.
d. Contractor shall, upon request of City, provide a list of all employees working under this Contract and shall provide, to the reasonable satisfaction of City, verification that all such employees are eligible to work in the United States. All costs associated with such verification shall be borne by Contractor. Once such request has been made, Contractor may not change employees working under this Contract without written notice to City, accompanied by the verification required herein for such employees. Contractor shall require all subcontractors and/or sub-consultants to make the same verification when hired to perform services under this Contract. e. If Contractor, or a subcontractor or subconsultant, knowingly employs an employee providing Work under this Contract who is not authorized to work in the United States, and/or fails to follow federal laws to determine the status of such employee, such shall constitute a material breach of this Contract and may be cause for immediate termination of this Contract by City.
f. Contractor shall indemnify and hold City, its officials and employees harmless for, of and from any loss, including but not limited to fines, penalties and corrective measures, City 362
11 may sustain by reason of Contractor’s failure to comply with said laws, rules and regulations in connection with the performance of this Contract.

ARTICLE 16
Governing Law and Venue
This Contract shall be construed in accordance with and governed by the laws of the State of California and Contractor shall submit to the jurisdiction of California courts. Venue for any dispute arising under this Contract shall be in Orange County, California.

ARTICLE 17
Integration and Amendment
a. This Contract constitutes the entire agreement of the parties. No other agreement, oral or written, pertaining to the Work to be performed under this Contract shall be of any force or effect unless it is in writing and signed by both parties. Any Work performed which is inconsistent with or in violation of the provisions of this Contract shall not be compensated. b. Amendments to this Contract must be in writing and signed by both parties. The City Manager is authorized to execute amendments to this Contract up to the amounts specified in Chapter 3.08 of the Orange Municipal Code.

ARTICLE 18
Notice
Except as otherwise provided herein, all notices required under this Contract shall be in writing and delivered personally, by e-mail, or by first class mail, postage prepaid, to each party at the address listed below. Either party may change the notice address by notifying the other party in writing. Notices shall be deemed received upon receipt of same or within three (3) days of deposit in the U.S. Mail, whichever is earlier. Notices sent by e-mail shall be deemed received on the date of the e-mail transmission.
“CONTRACTOR” “CITY”
American Asphalt South, Inc. City of Orange
P.O. Box 310036 300 E. Chapman Avenue
Fontana, CA 92331 Orange, CA 92866-1591
Attn: Jeff Petty Attn: Randy Nguyen
Telephone: 909-427-8276 Telephone: 714-744-5531
E-Mail: [email protected] E-Mail: [email protected] ARTICLE 19
Claim Resolution
City and Contractor agree that the claim resolution process applicable to any claim by Contractor in connection with the Work provided herein shall be subject to the procedures set forth 363
12 in California Public Contract Code Section 9204, attached hereto as Attachment No. 2, and incorporated herein by this reference.

ARTICLE 20
Counterparts
This Contract may be executed in one or more counterparts, each of which shall be deemed an original, but all of which together shall constitute one and the same instrument. Signatures transmitted via facsimile and electronic mail shall have the same effect as original signatures. “CITY”

CONTRACT, BONDS AND INSURANCE
APPROVED BY:

Mary E. Binning
Senior Assistant City Attorney
CITY OF ORANGE, a municipal corporation
By:

Mark A. Murphy
Mayor of the City of Orange
ATTEST:

Pamela Coleman, City Clerk
“CONTRACTOR”
AMERICAN ASPHALT SOUTH, INC.,
a California corporation
[Note: Signature of Chairman of the By:

Board, President or Vice President is Printed Name:
required] Title:
[Note: Signature of Secretary, Assistant By:

Secretary, Chief Financial Officer or Printed Name:

Assistant Treasurer is also required] Title:
364
Attachment No. 1

Page 1 of 13 ends

ATTACHMENT NO. 1

CALIFORNIA LABOR CODE
SECTIONS 1725.5, 1771, 1771.1, 1771.4, 1775, 1776, 1777.5, 1813 and 1815 Section 1725.5. Registration of contractors; mandatory registration; qualifications and application; fees; exempt contractors
A contractor shall be registered pursuant to this section to be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any public work contract that is subject to the requirements of this chapter. For the purposes of this section, “contractor” includes a subcontractor as defined by Section 1722.1. (a) To qualify for registration under this section, a contractor shall do all of the following:
(1)(A) Register with the Department of Industrial Relations in the manner prescribed by the department and pay an initial nonrefundable application fee of four hundred dollars ($400) to qualify for registration under this section and an annual renewal fee on or before July 1 of each year thereafter. The annual renewal fee shall be in a uniform amount set by the Director of Industrial Relations, and the initial registration and renewal fees may be adjusted no more than annually by the director to support the costs specified in Section 1771.3. (B) Beginning June 1, 2019, a contractor may register or renew according to this subdivision in annual increments up to three years from the date of registration. Contractors who wish to do so will be required to prepay the applicable nonrefundable application or renewal fees to qualify for the number of years for which they wish to preregister.
(2) Provide evidence, disclosures, or releases as are necessary to establish all of the following:
(A) Workers' compensation coverage that meets the requirements of Division 4 (commencing with Section 3200) and includes sufficient coverage for any worker whom the contractor employs to perform work that is subject to prevailing wage requirements other than a contractor who is separately registered under this section.

Coverage may be evidenced by a current and valid certificate of workers' compensation insurance or certification of self-insurance required under Section 7125 of the Business and Professions Code. (B) If applicable, the contractor is licensed in accordance with Chapter 9 (commencing with Section 7000) of the Business and Professions Code.
(C) The contractor does not have any delinquent liability to an employee or the state for any assessment of back wages or related damages, interest, fines, or penalties pursuant to any final judgment, order, or determination by a court or any federal, state, or local administrative agency, including a confirmed arbitration award. However, for purposes of this paragraph, the contractor shall not be disqualified for any judgment, order, or determination that is under appeal, provided that the contractor has secured the payment of any amount eventually found due through a bond or other appropriate means. (D) The contractor is not currently debarred under Section 1777.1 or under any other federal or state law providing for the debarment of contractors from public works. (E) The contractor has not bid on a public works contract, been listed in a bid proposal, or engaged in the performance of a contract for public works without being lawfully registered in accordance with this section, within the preceding 12 months or since the effective date of the requirements set forth in subdivision (e), whichever is earlier. If a contractor is found to be in violation of the requirements of this paragraph, the period of disqualification shall be waived if both of the following are true:
365
Attachment No. 1

Page 2 of 13 ends

(i) The contractor has not previously been found to be in violation of the requirements of this paragraph within the preceding 12 months.
(ii) The contractor pays an additional nonrefundable penalty registration fee of two thousand dollars ($2,000). (b) Fees received pursuant to this section shall be deposited in the State Public Works Enforcement Fund established by Section 1771.3 and shall be used only for the purposes specified in that section. (c) A contractor who fails to pay the renewal fee required under paragraph (1) of subdivision (a) on or before the expiration of any prior period of registration shall be prohibited from bidding on or engaging in the performance of any contract for public work until once again registered pursuant to this section. If the failure to pay the renewal fee was inadvertent, the contractor may renew its registration retroactively by paying an additional nonrefundable penalty renewal fee equal to the amount of the renewal fee within 90 days of the due date of the renewal fee.
(d) If, after a body awarding a contract accepts the contractor's bid or awards the contract, the work covered by the bid or contract is determined to be a public work to which Section 1771 applies, either as the result of a determination by the director pursuant to Section 1773.5 or a court decision, the requirements of this section shall not apply, subject to the following requirements:
(1) The body that awarded the contract failed, in the bid specification or in the contract documents, to identify as a public work that portion of the work that the determination or decision subsequently classifies as a public work.
(2) Within 20 days following service of notice on the awarding body of a determination by the Director of Industrial Relations pursuant to Section 1773.5 or a decision by a court that the contract was for public work as defined in this chapter, the contractor and any subcontractors are registered under this section or are replaced by a contractor or subcontractors who are registered under this section. (3) The requirements of this section shall apply prospectively only to any subsequent bid, bid proposal, contract, or work performed after the awarding body is served with notice of the determination or decision referred to in paragraph (2).
(e) The requirements of this section shall apply to any bid proposal submitted on or after March 1, 2015, to any contract for public work, as defined in this chapter, executed on or after April 1, 2015, and to any work performed under a contract for public work on or after January 1, 2018, regardless of when the contract for public work was executed.
(f) This section does not apply to work performed on a public works project of twenty-five thousand dollars ($25,000) or less when the project is for construction, alteration, demolition, installation, or repair work or to work performed on a public works project of fifteen thousand dollars ($15,000) or less when the project is for maintenance work.

Section 1771. Payment of general prevailing rate
Except for public works projects of one thousand dollars ($1,000) or less, not less than the general prevailing rate of per diem wages for work of a similar character in the locality in which the public work is performed, and not less than the general prevailing rate of per diem wages for holiday and overtime work fixed as provided in this chapter, shall be paid to all workers employed on public works.

This section is applicable only to work performed under contract, and is not applicable to work carried out by a public agency with its own forces. This section is applicable to contracts let for maintenance work. 366
Attachment No. 1

Page 3 of 13 ends

Section 1771.1. Registration as a contractor or subcontractor required prior to bid submission; exceptions; violations; penalties
(a) A contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5. It is not a violation of this section for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded.
(b) Notice of the requirement described in subdivision (a) shall be included in all bid invitations and public works contracts, and a bid shall not be accepted nor any contract or subcontract entered into without proof of the contractor or subcontractor's current registration to perform public work pursuant to Section 1725.5. (c) An inadvertent error in listing a subcontractor who is not registered pursuant to Section 1725.5 in a bid proposal shall not be grounds for filing a bid protest or grounds for considering the bid nonresponsive, provided that any of the following apply:
(1) The subcontractor is registered prior to the bid opening. (2) Within 24 hours after the bid opening, the subcontractor is registered and has paid the penalty registration fee specified in subparagraph (E) of paragraph (2) of subdivision (a) of Section 1725.5. (3) The subcontractor is replaced by another registered subcontractor pursuant to Section 4107 of the Public Contract Code.
(d) Failure by a subcontractor to be registered to perform public work as required by subdivision (a) shall be grounds under Section 4107 of the Public Contract Code for the contractor, with the consent of the awarding authority, to substitute a subcontractor who is registered to perform public work pursuant to Section 1725.5 in place of the unregistered subcontractor.
(e) The department shall maintain on its Internet Web site a list of contractors who are currently registered to perform public work pursuant to Section 1725.5.
(f) A contract entered into with any contractor or subcontractor in violation of subdivision (a) shall be subject to cancellation, provided that a contract for public work shall not be unlawful, void, or voidable solely due to the failure of the awarding body, contractor, or any subcontractor to comply with the requirements of Section 1725.5 or this section.
(g) If the Labor Commissioner or his or her designee determines that a contractor or subcontractor engaged in the performance of any public work contract without having been registered in accordance with this section, the contractor or subcontractor shall forfeit, as a civil penalty to the state, one hundred dollars ($100) for each day of work performed in violation of the registration requirement, not to exceed an aggregate penalty of eight thousand dollars ($8,000) in addition to any penalty registration fee assessed pursuant to clause (ii) of subparagraph (E) of paragraph (2) of subdivision (a) of Section 1725.5. (h)(1) In addition to, or in lieu of, any other penalty or sanction authorized pursuant to this chapter, a higher tiered public works contractor or subcontractor who is found to have entered into a subcontract with an unregistered lower tier subcontractor to perform any public work in violation of the requirements of Section 1725.5 or this section shall be subject to forfeiture, as a civil penalty to the state, of one hundred dollars ($100) 367
Attachment No. 1

Page 4 of 13 ends

for each day the unregistered lower tier subcontractor performs work in violation of the registration requirement, not to exceed an aggregate penalty of ten thousand dollars ($10,000). (2) The Labor Commissioner shall use the same standards specified in subparagraph (A) of paragraph (2) of subdivision (a) of Section 1775 when determining the severity of the violation and what penalty to assess, and may waive the penalty for a first time violation that was unintentional and did not hinder the Labor Commissioner's ability to monitor and enforce compliance with the requirements of this chapter. (3) A higher tiered public works contractor or subcontractor shall not be liable for penalties assessed pursuant to paragraph (1) if the lower tier subcontractor's performance is in violation of the requirements of Section 1725.5 due to the revocation of a previously approved registration. (4) A subcontractor shall not be liable for any penalties assessed against a higher tiered public works contractor or subcontractor pursuant to paragraph (1). A higher tiered public works contractor or subcontractor may not require a lower tiered subcontractor to indemnify or otherwise be liable for any penalties pursuant to paragraph (1).
(i) The Labor Commissioner or his or her designee shall issue a civil wage and penalty assessment, in accordance with the provisions of Section 1741, upon determination of penalties pursuant to subdivision (g) and subparagraph (B) of paragraph (1) of subdivision (h). Review of a civil wage and penalty assessment issued under this subdivision may be requested in accordance with the provisions of Section 1742. The regulations of the Director of Industrial Relations, which govern proceedings for review of civil wage and penalty assessments and the withholding of contract payments under Article 1 (commencing with Section 1720) and Article 2 (commencing with Section 1770), shall apply. (j)(1) Where a contractor or subcontractor engages in the performance of any public work contract without having been registered in violation of the requirements of Section 1725.5 or this section, the Labor Commissioner shall issue and serve a stop order prohibiting the use of the unregistered contractor or the unregistered subcontractor on all public works until the unregistered contractor or unregistered subcontractor is registered. The stop order shall not apply to work by registered contractors or subcontractors on the public work.
(2) A stop order may be personally served upon the contractor or subcontractor by either of the following methods:
(A) Manual delivery of the order to the contractor or subcontractor personally. (B) Leaving signed copies of the order with the person who is apparently in charge at the site of the public work and by thereafter mailing copies of the order by first class mail, postage prepaid to the contractor or subcontractor at one of the following:
(i) The address of the contractor or subcontractor on file with either the Secretary of State or the Contractors' State License Board.
(ii) If the contractor or subcontractor has no address on file with the Secretary of State or the Contractors' State License Board, the address of the site of the public work. (3) The stop order shall be effective immediately upon service and shall be subject to appeal by the party contracting with the unregistered contractor or subcontractor, by the unregistered contractor or subcontractor, or both. The appeal, hearing, and any further review of the hearing decision shall be governed by the procedures, time limits, and other requirements specified in subdivision (a) of Section 238.1. 368
Attachment No. 1

Page 5 of 13 ends

(4) Any employee of an unregistered contractor or subcontractor who is affected by a work stoppage ordered by the commissioner pursuant to this subdivision shall be paid at his or her regular hourly prevailing wage rate by that employer for any hours the employee would have worked but for the work stoppage, not to exceed 10 days.
(k) Failure of a contractor or subcontractor, owner, director, officer, or managing agent of the contractor or subcontractor to observe a stop order issued and served upon him or her pursuant to subdivision (j) is guilty of a misdemeanor punishable by imprisonment in county jail not exceeding 60 days or by a fine not exceeding ten thousand dollars ($10,000), or both.
(l) This section shall apply to any bid proposal submitted on or after March 1, 2015, and any contract for public work entered into on or after April 1, 2015. This section shall also apply to the performance of any public work, as defined in this chapter, on or after January 1, 2018, regardless of when the contract for public work was entered.
(m) Penalties received pursuant to this section shall be deposited in the State Public Works Enforcement Fund established by Section 1771.3 and shall be used only for the purposes specified in that section. (n) This section shall not apply to work performed on a public works project of twenty-five thousand dollars ($25,000) or less when the project is for construction, alteration, demolition, installation, or repair work or to work performed on a public works project of fifteen thousand dollars ($15,000) or less when the project is for maintenance work.

Section 1771.4. Additional requirements when bidding and awarding public works contracts (a) All of the following are applicable to all public works projects that are otherwise subject to the requirements of this chapter:
(1) The call for bids and contract documents shall specify that the project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. (2) The awarding body shall post or require the prime contractor to post job site notices, as prescribed by regulation.
(3) Each contractor and subcontractor shall furnish the records specified in Section 1776 directly to the Labor Commissioner, in the following manner:
(A) At least monthly or more frequently if specified in the contract with the awarding body. (B) In a format prescribed by the Labor Commissioner.
(4) If the contractor or subcontractor is not registered pursuant to Section 1725.5 and is performing work on a project for which registration is not required because of subdivision (f) of Section 1725.5, the unregistered contractor or subcontractor is not required to furnish the records specified in Section 1776 directly to the Labor Commissioner but shall retain the records specified in Section 1776for at least three years after completion of the work.
(5) The department shall undertake those activities it deems necessary to monitor and enforce compliance with prevailing wage requirements.
369
Attachment No. 1

Page 6 of 13 ends

(b) The Labor Commissioner may exempt a public works project from compliance with all or part of the requirements of subdivision (a) if either of the following occurs:
(1) The awarding body has enforced an approved labor compliance program, as defined in Section 1771.5, on all public works projects under its authority, except those deemed exempt pursuant to subdivision (a) of Section 1771.5, continuously since December 31, 2011.
(2) The awarding body has entered into a collective bargaining agreement that binds all contractors performing work on the project and that includes a mechanism for resolving disputes about the payment of wages. (c) The requirements of paragraph (1) of subdivision (a) shall only apply to contracts for public works projects awarded on or after January 1, 2015.
(d) The requirements of paragraph (3) of subdivision (a) shall apply to all contracts for public work, whether new or ongoing, on or after January 1, 2016.

Section 1775. Penalties for violations
(a)(1) The contractor and any subcontractor under the contractor shall, as a penalty to the state or political subdivision on whose behalf the contract is made or awarded, forfeit not more than two hundred dollars ($200) for each calendar day, or portion thereof, for each worker paid less than the prevailing wage rates as determined by the director for the work or craft in which the worker is employed for any public work done under the contract by the contractor or, except as provided in subdivision (b), by any subcontractor under the contractor.
(2)(A) The amount of the penalty shall be determined by the Labor Commissioner based on consideration of both of the following:
(i) Whether the failure of the contractor or subcontractor to pay the correct rate of per diem wages was a good faith mistake and, if so, the error was promptly and voluntarily corrected when brought to the attention of the contractor or subcontractor.
(ii) Whether the contractor or subcontractor has a prior record of failing to meet its prevailing wage obligations.
(B)(i) The penalty may not be less than forty dollars ($40) for each calendar day, or portion thereof, for each worker paid less than the prevailing wage rate, unless the failure of the contractor or subcontractor to pay the correct rate of per diem wages was a good faith mistake and, if so, the error was promptly and voluntarily corrected when brought to the attention of the contractor or subcontractor. (ii) The penalty may not be less than eighty dollars ($80) for each calendar day, or portion thereof, for each worker paid less than the prevailing wage rate, if the contractor or subcontractor has been assessed penalties within the previous three years for failing to meet its prevailing wage obligations on a separate contract, unless those penalties were subsequently withdrawn or overturned. (iii) The penalty may not be less than one hundred twenty dollars ($120) for each calendar day, or portion thereof, for each worker paid less than the prevailing wage rate, if the Labor Commissioner determines that the violation was willful, as defined in subdivision (c) of Section 1777.1. (C) If the amount due under this section is collected from the contractor or subcontractor, any outstanding wage claim under Chapter 1 (commencing with Section 1720) of Part 7 of Division 2 against that contractor 370
Attachment No. 1

Page 7 of 13 ends

or subcontractor shall be satisfied before applying that amount to the penalty imposed on that contractor or subcontractor pursuant to this section.
(D) The determination of the Labor Commissioner as to the amount of the penalty shall be reviewable only for abuse of discretion.
(E) The difference between the prevailing wage rates and the amount paid to each worker for each calendar day or portion thereof for which each worker was paid less than the prevailing wage rate shall be paid to each worker by the contractor or subcontractor, and the body awarding the contract shall cause to be inserted in the contract a stipulation that this section will be complied with. (b) If a worker employed by a subcontractor on a public works project is not paid the general prevailing rate of per diem wages by the subcontractor, the prime contractor of the project is not liable for any penalties under subdivision (a) unless the prime contractor had knowledge of that failure of the subcontractor to pay the specified prevailing rate of wages to those workers or unless the prime contractor fails to comply with all of the following requirements:
(1) The contract executed between the contractor and the subcontractor for the performance of work on the public works project shall include a copy of the provisions of this section and Sections 1771, 1776, 1777.5, 1813, and 1815.
(2) The contractor shall monitor the payment of the specified general prevailing rate of per diem wages by the subcontractor to the employees, by periodic review of the certified payroll records of the subcontractor. (3) Upon becoming aware of the failure of the subcontractor to pay his or her workers the specified prevailing rate of wages, the contractor shall diligently take corrective action to halt or rectify the failure, including, but not limited to, retaining sufficient funds due the subcontractor for work performed on the public works project. (4) Prior to making final payment to the subcontractor for work performed on the public works project, the contractor shall obtain an affidavit signed under penalty of perjury from the subcontractor that the subcontractor has paid the specified general prevailing rate of per diem wages to his or her employees on the public works project and any amounts due pursuant to Section 1813. (c) The Division of Labor Standards Enforcement shall notify the contractor on a public works project within 15 days of the receipt by the Division of Labor Standards Enforcement of a complaint of the failure of a subcontractor on that public works project to pay workers the general prevailing rate of per diem wages.

Section 1776. Payroll records; retention; inspection; redacted information; agencies entitled to receive nonredacted copies of certified records; noncompliance penalties; rules (a) Each contractor and subcontractor shall keep accurate payroll records, showing the name, address, social security number, work classification, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed by him or her in connection with the public work. Each payroll record shall contain or be verified by a written declaration that it is made under penalty of perjury, stating both of the following:
(1) The information contained in the payroll record is true and correct. (2) The employer has complied with the requirements of Sections 1771, 1811, and 1815 for any work performed by his or her employees on the public works project. 371
Attachment No. 1

Page 8 of 13 ends

(b) The payroll records enumerated under subdivision (a) shall be certified and shall be available for inspection at all reasonable hours at the principal office of the contractor on the following basis:
(1) A certified copy of an employee's payroll record shall be made available for inspection or furnished to the employee or his or her authorized representative on request. (2) A certified copy of all payroll records enumerated in subdivision (a) shall be made available for inspection or furnished upon request to a representative of the body awarding the contract and the Division of Labor Standards Enforcement of the Department of Industrial Relations. (3) A certified copy of all payroll records enumerated in subdivision (a) shall be made available upon request by the public for inspection or for copies thereof. However, a request by the public shall be made through either the body awarding the contract or the Division of Labor Standards Enforcement. If the requested payroll records have not been provided pursuant to paragraph (2), the requesting party shall, prior to being provided the records, reimburse the costs of preparation by the contractor, subcontractors, and the entity through which the request was made. The public may not be given access to the records at the principal office of the contractor.
(c) Unless required to be furnished directly to the Labor Commissioner in accordance with paragraph (3) of subdivision (a) of Section 1771.4, the certified payroll records shall be on forms provided by the Division of Labor Standards Enforcement or shall contain the same information as the forms provided by the division.

The payroll records may consist of printouts of payroll data that are maintained as computer records, if the printouts contain the same information as the forms provided by the division and the printouts are verified in the manner specified in subdivision (a).
(d) A contractor or subcontractor shall file a certified copy of the records enumerated in subdivision (a) with the entity that requested the records within 10 days after receipt of a written request. (e) Except as provided in subdivision (f), any copy of records made available for inspection as copies and furnished upon request to the public or any public agency by the awarding body or the Division of Labor Standards Enforcement shall be marked or obliterated to prevent disclosure of an individual's name, address, and social security number. The name and address of the contractor awarded the contract or the subcontractor performing the contract shall not be marked or obliterated. Any copy of records made available for inspection by, or furnished to, a multiemployer Taft-Hartley trust fund (29 U.S.C. Sec. 186(c)(5)) that requests the records for the purposes of allocating contributions to participants shall be marked or obliterated only to prevent disclosure of an individual's full social security number, but shall provide the last four digits of the social security number. Any copy of records made available for inspection by, or furnished to, a joint labormanagement committee established pursuant to the federal Labor Management Cooperation Act of 1978 (29 U.S.C. Sec. 175a) shall be marked or obliterated only to prevent disclosure of an individual's social security number.
(f)(1) Notwithstanding any other provision of law, agencies that are included in the Joint Enforcement Strike Force on the Underground Economy established pursuant to Section 329 of the Unemployment Insurance Code and other law enforcement agencies investigating violations of law shall, upon request, be provided nonredacted copies of certified payroll records. Any copies of records or certified payroll made available for inspection and furnished upon request to the public by an agency included in the Joint Enforcement Strike Force on the Underground Economy or to a law enforcement agency investigating a violation of law shall be marked or redacted to prevent disclosure of an individual's name, address, and social security number. 372
Attachment No. 1

Page 9 of 13 ends

(2) An employer shall not be liable for damages in a civil action for any reasonable act or omission taken in good faith in compliance with this subdivision.
(g) The contractor shall inform the body awarding the contract of the location of the records enumerated under subdivision (a), including the street address, city, and county, and shall, within five working days, provide a notice of a change of location and address.
(h) The contractor or subcontractor has 10 days in which to comply subsequent to receipt of a written notice requesting the records enumerated in subdivision (a). In the event that the contractor or subcontractor fails to comply within the 10-day period, he or she shall, as a penalty to the state or political subdivision on whose behalf the contract is made or awarded, forfeit one hundred dollars ($100) for each calendar day, or portion thereof, for each worker, until strict compliance is effectuated. Upon the request of the Division of Labor Standards Enforcement, these penalties shall be withheld from progress payments then due. A contractor is not subject to a penalty assessment pursuant to this section due to the failure of a subcontractor to comply with this section.
(i) The body awarding the contract shall cause to be inserted in the contract stipulations to effectuate this section.
(j) The director shall adopt rules consistent with the California Public Records Act (Chapter 3.5 (commencing with Section 6250) of Division 7 of Title 1 of the Government Code) and the Information Practices Act of 1977 (Title 1.8 (commencing with Section 1798) of Part 4 of Division 3 of the Civil Code) governing the release of these records, including the establishment of reasonable fees to be charged for reproducing copies of records required by this section.

Section 1777.5. Employment of registered apprentices; wages; standards; number; apprenticeable craft or trade; exemptions; contributions; compliance program (a)(1) This chapter does not prevent the employment upon public works of properly registered apprentices who are active participants in an approved apprenticeship program. (2) For purposes of this chapter, “apprenticeship program” means a program under the jurisdiction of the California Apprenticeship Council established pursuant to Section 3070. (b)(1) Every apprentice employed upon public works shall be paid the prevailing rate of per diem wages for apprentices in the trade to which he or she is registered and shall be employed only at the work of the craft or trade to which he or she is registered.
(2) Unless otherwise provided by a collective bargaining agreement, when a contractor requests the dispatch of an apprentice pursuant to this section to perform work on a public works project and requires the apprentice to fill out an application or undergo testing, training, an examination, or other preemployment process as a condition of employment, the apprentice shall be paid for the time spent on the required preemployment activity, including travel time to and from the required activity, if any, at the prevailing rate of per diem wages for apprentices in the trade to which he or she is registered. Unless otherwise provided by a collective bargaining agreement, a contractor is not required to compensate an apprentice for the time spent on preemployment activities if the apprentice is required to take a preemployment drug or alcohol test and he or she fails to pass that test.
(c) Only apprentices, as defined in Section 3077, who are in training under apprenticeship standards that have been approved by the Chief of the Division of Apprenticeship Standards and who are parties to written 373
Attachment No. 1

Page 10 of 13 ends

apprentice agreements under Chapter 4 (commencing with Section 3070) of Division 3 are eligible to be employed at the apprentice wage rate on public works. The employment and training of each apprentice shall be in accordance with either of the following:
(1) The apprenticeship standards and apprentice agreements under which he or she is training. (2) The rules and regulations of the California Apprenticeship Council. (d) If the contractor to whom the contract is awarded by the state or any political subdivision, in performing any of the work under the contract, employs workers in any apprenticeable craft or trade, the contractor shall employ apprentices in at least the ratio set forth in this section and may apply to any apprenticeship program in the craft or trade that can provide apprentices to the site of the public work for a certificate approving the contractor under the apprenticeship standards for the employment and training of apprentices in the area or industry affected. However, the decision of the apprenticeship program to approve or deny a certificate shall be subject to review by the Administrator of Apprenticeship. The apprenticeship program or programs, upon approving the contractor, shall arrange for the dispatch of apprentices to the contractor. A contractor covered by an apprenticeship program's standards shall not be required to submit any additional application in order to include additional public works contracts under that program. “Apprenticeable craft or trade,” as used in this section, means a craft or trade determined as an apprenticeable occupation in accordance with rules and regulations prescribed by the California Apprenticeship Council. As used in this section, “contractor” includes any subcontractor under a contractor who performs any public works not excluded by subdivision (o).
(e) Before commencing work on a contract for public works, every contractor shall submit contract award information to an applicable apprenticeship program that can supply apprentices to the site of the public work.

The information submitted shall include an estimate of journeyman hours to be performed under the contract, the number of apprentices proposed to be employed, and the approximate dates the apprentices would be employed. A copy of this information shall also be submitted to the awarding body, if requested by the awarding body. Within 60 days after concluding work on the contract, each contractor and subcontractor shall submit to the awarding body, if requested, and to the apprenticeship program a verified statement of the journeyman and apprentice hours performed on the contract. The information under this subdivision shall be public. The apprenticeship programs shall retain this information for 12 months. (f) The apprenticeship program supplying apprentices to the area of the site of the public work shall ensure equal employment and affirmative action in apprenticeship for women and minorities. (g) The ratio of work performed by apprentices to journeymen employed in a particular craft or trade on the public work may be no higher than the ratio stipulated in the apprenticeship standards under which the apprenticeship program operates if the contractor agrees to be bound by those standards. However, except as otherwise provided in this section, in no case shall the ratio be less than one hour of apprentice work for every five hours of journeyman work.
(h) This ratio of apprentice work to journeyman work shall apply during any day or portion of a day when any journeyman is employed at the jobsite and shall be computed on the basis of the hours worked during the day by journeymen so employed. Any work performed by a journeyman in excess of eight hours per day or 40 hours per week shall not be used to calculate the ratio. The contractor shall employ apprentices for the number of hours computed as above before the end of the contract or, in the case of a subcontractor, before the end of the subcontract. However, the contractor shall endeavor, to the greatest extent possible, to employ apprentices during the same time period that the journeymen in the same craft or trade are employed at the jobsite. When an hourly apprenticeship ratio is not feasible for a particular craft or trade, the Administrator 374
Attachment No. 1

Page 11 of 13 ends

of Apprenticeship, upon application of an apprenticeship program, may order a minimum ratio of not less than one apprentice for each five journeymen in a craft or trade classification. (i) A contractor covered by this section who has agreed to be covered by an apprenticeship program's standards upon the issuance of the approval certificate, or who has been previously approved for an apprenticeship program in the craft or trade, shall employ the number of apprentices or the ratio of apprentices to journeymen stipulated in the applicable apprenticeship standards, but in no event less than the 1-to-5 ratio required by subdivision (g).
(j) Upon proper showing by a contractor that he or she employs apprentices in a particular craft or trade in the state on all of his or her contracts on an annual average of not less than one hour of apprentice work for every five hours of labor performed by journeymen, the Administrator of Apprenticeship may grant a certificate exempting the contractor from the 1-to-5 hourly ratio, as set forth in this section for that craft or trade. (k) An apprenticeship program has the discretion to grant to a participating contractor or contractor association a certificate, which shall be subject to the approval of the Administrator of Apprenticeship, exempting the contractor from the 1-to-5 ratio set forth in this section when it finds that any one of the following conditions is met:
(1) Unemployment for the previous three-month period in the area exceeds an average of 15 percent. (2) The number of apprentices in training in the area exceeds a ratio of 1 to 5. (3) There is a showing that the apprenticeable craft or trade is replacing at least one-thirtieth of its journeymen annually through apprenticeship training, either on a statewide basis or on a local basis. (4) Assignment of an apprentice to any work performed under a public works contract would create a condition that would jeopardize his or her life or the life, safety, or property of fellow employees or the public at large, or the specific task to which the apprentice is to be assigned is of a nature that training cannot be provided by a journeyman.
(l) If an exemption is granted pursuant to subdivision (k) to an organization that represents contractors in a specific trade from the 1-to-5 ratio on a local or statewide basis, the member contractors shall not be required to submit individual applications for approval to local joint apprenticeship committees, if they are already covered by the local apprenticeship standards.
(m)(1) A contractor to whom a contract is awarded, who, in performing any of the work under the contract, employs journeymen or apprentices in any apprenticeable craft or trade shall contribute to the California Apprenticeship Council the same amount that the director determines is the prevailing amount of apprenticeship training contributions in the area of the public works site. A contractor may take as a credit for payments to the council any amounts paid by the contractor to an approved apprenticeship program that can supply apprentices to the site of the public works project. The contractor may add the amount of the contributions in computing his or her bid for the contract. (2)(A) At the conclusion of the 2002-03 fiscal year and each fiscal year thereafter, the California Apprenticeship Council shall distribute training contributions received by the council under this subdivision, less the expenses of the Department of Industrial Relations for administering this subdivision, by making grants to approved apprenticeship programs for the purpose of training apprentices. The grant funds shall be distributed as follows:
375
Attachment No. 1

Page 12 of 13 ends

(i) If there is an approved multiemployer apprenticeship program serving the same craft or trade and geographic area for which the training contributions were made to the council, a grant to that program shall be made.
(ii) If there are two or more approved multiemployer apprenticeship programs serving the same craft or trade and county for which the training contributions were made to the council, the grant shall be divided among those programs based on the number of apprentices from that county registered in each program. (iii) All training contributions not distributed under clauses (i) and (ii) shall be used to defray the future expenses of the Department of Industrial Relations for the administration and enforcement of apprenticeship and preapprenticeship standards and requirements under this code. (B) An apprenticeship program shall only be eligible to receive grant funds pursuant to this subdivision if the apprenticeship program agrees, prior to the receipt of any grant funds, to keep adequate records that document the expenditure of grant funds and to make all records available to the Department of Industrial Relations so that the Department of Industrial Relations is able to verify that grant funds were used solely for training apprentices. For purposes of this subparagraph, adequate records include, but are not limited to, invoices, receipts, and canceled checks that account for the expenditure of grant funds. This subparagraph shall not be deemed to require an apprenticeship program to provide the Department of Industrial Relations with more documentation than is necessary to verify the appropriate expenditure of grant funds made pursuant to this subdivision.
(C) The Department of Industrial Relations shall verify that grants made pursuant to this subdivision are used solely to fund training apprentices. If an apprenticeship program is unable to demonstrate how grant funds are expended or if an apprenticeship program is found to be using grant funds for purposes other than training apprentices, then the apprenticeship program shall not be eligible to receive any future grant pursuant to this subdivision and the Department of Industrial Relations may initiate the process to rescind the registration of the apprenticeship program.
(3) All training contributions received pursuant to this subdivision shall be deposited in the Apprenticeship Training Contribution Fund, which is hereby created in the State Treasury. Upon appropriation by the Legislature, all moneys in the Apprenticeship Training Contribution Fund shall be used for the purpose of carrying out this subdivision and to pay the expenses of the Department of Industrial Relations. (n) The body awarding the contract shall cause to be inserted in the contract stipulations to effectuate this section. The stipulations shall fix the responsibility of compliance with this section for all apprenticeable occupations with the prime contractor.
(o) This section does not apply to contracts of general contractors or to contracts of specialty contractors not bidding for work through a general or prime contractor when the contracts of general contractors or those specialty contractors involve less than thirty thousand dollars ($30,000). (p) An awarding body that implements an approved labor compliance program in accordance with subdivision (b) of Section 1771.5 may, with the approval of the director, assist in the enforcement of this section under the terms and conditions prescribed by the director.

Section 1813. Forfeiture for violations; contract stipulation; report of violations The contractor or subcontractor shall, as a penalty to the state or political subdivision on whose behalf the contract is made or awarded, forfeit twenty- five dollars ($25) for each worker employed in the execution of 376
Attachment No. 1

Page 13 of 13 ends

the contract by the respective contractor or subcontractor for each calendar day during which the worker is required or permitted to work more than 8 hours in any one calendar day and 40 hours in any one calendar week in violation of the provisions of this article. In awarding any contract for public work, the awarding body shall cause to be inserted in the contract a stipulation to this effect. The awarding body shall take cognizance of all violations of this article committed in the course of the execution of the contract, and shall report them to the Division of Labor Standards Enforcement.

Section 1815. Overtime
Notwithstanding the provisions of Sections 1810 to 1814, inclusive, of this code, and notwithstanding any stipulation inserted in any contract pursuant to the requirements of said sections, work performed by employees of contractors in excess of 8 hours per day, and 40 hours during any one week, shall be permitted upon public work upon compensation for all hours worked in excess of 8 hours per day at not less than 1 ½ times the basic rate of pay.
377
Attachment No. 2

Page 1 of 3 ends

ATTACHMENT NO. 2
CALIFORNIA PUBLIC CONTRACT CODE SECTION 9204
Section 9204. Legislative findings and declarations regarding timely and complete payment of contractors for public works projects; claims process (Eff: January 1, 2017) (a) The Legislature finds and declares that it is in the best interests of the state and its citizens to ensure that all construction business performed on a public works project in the state that is complete and not in dispute is paid in full and in a timely manner.
(b) Notwithstanding any other law, including, but not limited to, Article 7.1 (commencing with Section 10240) of Chapter 1 of Part 2, Chapter 10 (commencing with Section 19100) of Part 2, and Article 1.5 (commencing with Section 20104) of Chapter 1 of Part 3, this section shall apply to any claim by a contractor in connection with a public works project.
(c) For purposes of this section:
(1) “Claim” means a separate demand by a contractor sent by registered mail or certified mail with return receipt requested, for one or more of the following:
(A) A time extension, including, without limitation, for relief from damages or penalties for delay assessed by a public entity under a contract for a public works project. (B) Payment by the public entity of money or damages arising from work done by, or on behalf of, the contractor pursuant to the contract for a public works project and payment for which is not otherwise expressly provided or to which the claimant is not otherwise entitled. (C) Payment of an amount that is disputed by the public entity. (2) “Contractor” means any type of contractor within the meaning of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code who has entered into a direct contract with a public entity for a public works project.
(3)(A) “Public entity” means, without limitation, except as provided in subparagraph (B), a state agency, department, office, division, bureau, board, or commission, the California State University, the University of California, a city, including a charter city, county, including a charter county, city and county, including a charter city and county, district, special district, public authority, political subdivision, public corporation, or nonprofit transit corporation wholly owned by a public agency and formed to carry out the purposes of the public agency.
(B) “Public entity” shall not include the following:
(i) The Department of Water Resources as to any project under the jurisdiction of that department. (ii) The Department of Transportation as to any project under the jurisdiction of that department. (iii) The Department of Parks and Recreation as to any project under the jurisdiction of that department. (iv) The Department of Corrections and Rehabilitation with respect to any project under its jurisdiction pursuant to Chapter 11 (commencing with Section 7000) of Title 7 of Part 3 of the Penal Code. 378
Attachment No. 2

Page 2 of 3 ends

(v) The Military Department as to any project under the jurisdiction of that department. (vi) The Department of General Services as to all other projects. (vii) The High-Speed Rail Authority.
(4) “Public works project” means the erection, construction, alteration, repair, or improvement of any public structure, building, road, or other public improvement of any kind. (5) “Subcontractor” means any type of contractor within the meaning of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code who either is in direct contract with a contractor or is a lower tier subcontractor.
(d)(1)(A) Upon receipt of a claim pursuant to this section, the public entity to which the claim applies shall conduct a reasonable review of the claim and, within a period not to exceed 45 days, shall provide the claimant a written statement identifying what portion of the claim is disputed and what portion is undisputed. Upon receipt of a claim, a public entity and a contractor may, by mutual agreement, extend the time period provided in this subdivision.
(B) The claimant shall furnish reasonable documentation to support the claim. (C) If the public entity needs approval from its governing body to provide the claimant a written statement identifying the disputed portion and the undisputed portion of the claim, and the governing body does not meet within the 45 days or within the mutually agreed to extension of time following receipt of a claim sent by registered mail or certified mail, return receipt requested, the public entity shall have up to three days following the next duly publicly noticed meeting of the governing body after the 45-day period, or extension, expires to provide the claimant a written statement identifying the disputed portion and the undisputed portion. (D) Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. If the public entity fails to issue a written statement, paragraph (3) shall apply.
(2)(A) If the claimant disputes the public entity’s written response, or if the public entity fails to respond to a claim issued pursuant to this section within the time prescribed, the claimant may demand in writing an informal conference to meet and confer for settlement of the issues in dispute. Upon receipt of a demand in writing sent by registered mail or certified mail, return receipt requested, the public entity shall schedule a meet and confer conference within 30 days for settlement of the dispute. (B) Within 10 business days following the conclusion of the meet and confer conference, if the claim or any portion of the claim remains in dispute, the public entity shall provide the claimant a written statement identifying the portion of the claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. Any disputed portion of the claim, as identified by the contractor in writing, shall be submitted to nonbinding mediation, with the public entity and the claimant sharing the associated costs equally. The public entity and claimant shall mutually agree to a mediator within 10 business days after the disputed portion of the claim has been identified in writing. If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the claim. Each party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator. If mediation is unsuccessful, the parts of the claim remaining in dispute shall be subject to applicable procedures outside this section. 379
Attachment No. 2

Page 3 of 3 ends

(C) For purposes of this section, mediation includes any nonbinding process, including, but not limited to, neutral evaluation or a dispute review board, in which an independent third party or board assists the parties in dispute resolution through negotiation or by issuance of an evaluation. Any mediation utilized shall conform to the timeframes in this section.
(D) Unless otherwise agreed to by the public entity and the contractor in writing, the mediation conducted pursuant to this section shall excuse any further obligation under Section 20104.4 to mediate after litigation has been commenced.
(E) This section does not preclude a public entity from requiring arbitration of disputes under private arbitration or the Public Works Contract Arbitration Program, if mediation under this section does not resolve the parties’ dispute.
(3) Failure by the public entity to respond to a claim from a contractor within the time periods described in this subdivision or to otherwise meet the time requirements of this section shall result in the claim being deemed rejected in its entirety. A claim that is denied by reason of the public entity’s failure to have responded to a claim, or its failure to otherwise meet the time requirements of this section, shall not constitute an adverse finding with regard to the merits of the claim or the responsibility or qualifications of the claimant. (4) Amounts not paid in a timely manner as required by this section shall bear interest at 7 percent per annum. (5) If a subcontractor or a lower tier subcontractor lacks legal standing to assert a claim against a public entity because privity of contract does not exist, the contractor may present to the public entity a claim on behalf of a subcontractor or lower tier subcontractor. A subcontractor may request in writing, either on their own behalf or on behalf of a lower tier subcontractor, that the contractor present a claim for work which was performed by the subcontractor or by a lower tier subcontractor on behalf of the subcontractor. The subcontractor requesting that the claim be presented to the public entity shall furnish reasonable documentation to support the claim. Within 45 days of receipt of this written request, the contractor shall notify the subcontractor in writing as to whether the contractor presented the claim to the public entity and, if the original contractor did not present the claim, provide the subcontractor with a statement of the reasons for not having done so. (e) The text of this section or a summary of it shall be set forth in the plans or specifications for any public works project that may give rise to a claim under this section. (f) A waiver of the rights granted by this section is void and contrary to public policy, provided, however, that (1) upon receipt of a claim, the parties may mutually agree to waive, in writing, mediation and proceed directly to the commencement of a civil action or binding arbitration, as applicable; and (2) a public entity may prescribe reasonable change order, claim, and dispute resolution procedures and requirements in addition to the provisions of this section, so long as the contractual provisions do not conflict with or otherwise impair the timeframes and procedures set forth in this section. (g) This section applies to contracts entered into on or after January 1, 2017. (h) Nothing in this section shall impose liability upon a public entity that makes loans or grants available through a competitive application process, for the failure of an awardee to meet its contractual obligations. (i) This section shall remain in effect only until January 1, 2027, and as of that date is repealed, unless a later enacted statute, that is enacted before January 1, 2027, deletes or extends that date. 380
2022 Annual Slurry Seal Location Map (Tract A)
3/21/2022, 1:54:18 PM
J
0 360 720 1,440 2,160 2,880
ft
381
2022 Annual Slurry Seal Location Map (Tract B)
3/21/2022, 1:55:57 PM
J
0 180 360 720 1,080 1,440
ft
382
2022 Annual Slurry Seal Location Map (Tract C)
5/4/2022, 11:26:57 AM
J
0 180 360 720 1,080 1,440
ft
383
2022 Annual Slurry Seal Location Map (Tract D)
5/4/2022, 11:09:57 AM
J
0 90 180 360 540 720
ft
384
Agenda Item
City Council
Item #: 3.31. 6/14/2022 File #: 22-0338
TO: Honorable Mayor and Members of the City Council
THRU: Rob Houston, City Manager
FROM: Christopher Cash, Public Works Director

1. SUBJECT
Award of Contract to Common Area Maintenance Service, Inc., dba CAM Services, for sidewalk steam cleaning services; RFP No. 21-22.39.

2. SUMMARY
Proposals for steam cleaning services were received on May 19, 2022. Three contractors responded to the Request for Proposals (RFP). The highest-ranked contractor is CAM Services with a cost proposal of $77,448 per year. The contract is for an initial term of three fiscal years with the option of two one-year extensions. The contract will be written for an annual amount of $85,193, which will include a ten percent contingency to cover any unscheduled cleanings, as necessary.

3. RECOMMENDED ACTION
Approve a three-year contract in the amount of $255,579, at $85,193 per year, to CAM Services, and authorize the Mayor and City Clerk to execute on behalf of the City.

4. FISCAL IMPACT
The total expenditure for the contract is $255,579 and will be funded through General Fund (100).

5. STRATEGIC PLAN GOALS
Goal 1: Provide for a safe community
b: Provide and maintain infrastructure necessary to ensure the safety of the public.

Goal 1: Provide for a safe community
b: Provide and maintain infrastructure necessary to ensure the safety of the public.

6. DISCUSSION AND BACKGROUND
This project consists of providing steam cleaning services of the public sidewalks, trash enclosures, and trash cans located in the Plaza, on Old Towne spoke streets, and Plaza Park. In addition, services under this contract include cleaning of areas permitted as part of the City’s Outdoor Dining Permit. Lastly, additional areas covered under this contract include concrete cleaning of areas at the City’s Main Library, Yorba Dog Park, and the City Hall breezeway. The Request for Proposals (RFP) was advertised starting on May 4, 2022. Three proposals were received on May 19, 2022, from the following companies:

City of Orange Page 1 of 2 Printed on 6/9/2022
powered by Legistar™385
Item #: 3.31. 6/14/2022 File #: 22-0338

1. Common Area Maintenance Services, Inc. (dba CAM Services), Orange, CA

2. Ultimate Maintenance Services, Inc., Lawndale, CA

3. Superior Property Services, Inc., Pico Rivera, CA
The current steam cleaning contract frequency is not sufficient to keep up with the increased pedestrian traffic, outdoor dining, increased number of carry-out restaurants, and transients at the public facilities. The proposed contract will increase all the spoke streets from monthly to weekly. In addition, Community Services added frequency at the Yorba Dog Park and the Train Depot.

A rating panel consisting of three members from the City’s Public Works Department reviewed the proposals received. Based upon the selection criteria listed in the RFP, the committee unanimously rated CAM Services as their top scoring firm. In addition, CAM Services has been providing satisfactory steam cleaning services to the City since 2010 and has always been very responsive to the City’s routine service needs as well as special requests for City events.

Funding for this contract is dependent upon City Council approval of the Fiscal Year 2022-23 budget.

Staff recommends a contract be awarded to CAM Services in the amount of $255,579, at $85,193 per year for steam cleaning services.

7. ATTACHMENTS
· Maintenance Services Agreement
City of Orange Page 2 of 2 Printed on 6/9/2022
powered by Legistar™386
Agenda Item
City Council
Item #: 3.31. 6/14/2022 File #: 22-0338
TO: Honorable Mayor and Members of the City Council
THRU: Rob Houston, City Manager
FROM: Christopher Cash, Public Works Director

1. SUBJECT
Award of Contract to Common Area Maintenance Service, Inc., dba CAM Services, for sidewalk steam cleaning services; RFP No. 21-22.39.

2. SUMMARY
Proposals for steam cleaning services were received on May 19, 2022. Three contractors responded to the Request for Proposals (RFP). The highest-ranked contractor is CAM Services with a cost proposal of $77,448 per year. The contract is for an initial term of three fiscal years with the option of two one-year extensions. The contract will be written for an annual amount of $85,193, which will include a ten percent contingency to cover any unscheduled cleanings, as necessary.

3. RECOMMENDED ACTION
Approve a three-year contract in the amount of $255,579, at $85,193 per year, to CAM Services, and authorize the Mayor and City Clerk to execute on behalf of the City.

4. FISCAL IMPACT
The total expenditure for the contract is $255,579 and will be funded through General Fund (100).

5. STRATEGIC PLAN GOALS
Goal 1: Provide for a safe community
b: Provide and maintain infrastructure necessary to ensure the safety of the public.

Goal 1: Provide for a safe community
b: Provide and maintain infrastructure necessary to ensure the safety of the public.

6. DISCUSSION AND BACKGROUND
This project consists of providing steam cleaning services of the public sidewalks, trash enclosures, and trash cans located in the Plaza, on Old Towne spoke streets, and Plaza Park. In addition, services under this contract include cleaning of areas permitted as part of the City’s Outdoor Dining Permit. Lastly, additional areas covered under this contract include concrete cleaning of areas at the City’s Main Library, Yorba Dog Park, and the City Hall breezeway. The Request for Proposals (RFP) was advertised starting on May 4, 2022. Three proposals were received on May 19, 2022, from the following companies:

City of Orange Page 1 of 2 Printed on 6/9/2022
powered by Legistar™387
Item #: 3.31. 6/14/2022 File #: 22-0338

1. Common Area Maintenance Services, Inc. (dba CAM Services), Orange, CA

2. Ultimate Maintenance Services, Inc., Lawndale, CA

3. Superior Property Services, Inc., Pico Rivera, CA
The current steam cleaning contract frequency is not sufficient to keep up with the increased pedestrian traffic, outdoor dining, increased number of carry-out restaurants, and transients at the public facilities. The proposed contract will increase all the spoke streets from monthly to weekly. In addition, Community Services added frequency at the Yorba Dog Park and the Train Depot.

A rating panel consisting of three members from the City’s Public Works Department reviewed the proposals received. Based upon the selection criteria listed in the RFP, the committee unanimously rated CAM Services as their top scoring firm. In addition, CAM Services has been providing satisfactory steam cleaning services to the City since 2010 and has always been very responsive to the City’s routine service needs as well as special requests for City events.

Funding for this contract is dependent upon City Council approval of the Fiscal Year 2022-23 budget.

Staff recommends a contract be awarded to CAM Services in the amount of $255,579, at $85,193 per year for steam cleaning services.

7. ATTACHMENTS
· Maintenance Services Agreement
City of Orange Page 2 of 2 Printed on 6/9/2022
powered by Legistar™388

MAINTENANCE SERVICES AGREEMENT
[Maintenance Services for Steam Cleaning Services at Various Locations] THIS MAINTENANCE SERVICES AGREEMENT (the “Agreement”) is made at Orange, California, on this _____ day of ______________________, 2022, by and between the CITY OF ORANGE, a municipal corporation (“City”) and COMMON AREA MAINTENANCE SERVICES, INC., a California corporation, dba CAM PROPERTY SERVICES (“Contractor”), who agree as follows.

1. Services. Subject to the terms and conditions set forth in this Agreement, Contractor shall provide to the reasonable satisfaction of City the services set forth in Exhibit “A,” which is attached hereto and incorporated herein by this reference. As a material inducement to City to enter into this Agreement, Contractor represents and warrants that it has thoroughly investigated and considered the scope of services and fully understands the difficulties and restrictions in performing the work. Contractor represents that it is experienced in performing the work and will follow the highest professional standards in performance of the work. All services provided shall conform to all federal, state and local laws, rules and regulations and to the best professional standards and practices.

The terms and conditions set forth in this Agreement shall control over any terms and conditions in Exhibit "A" to the contrary.

Ruben Hernandez, Assistant Field Services Manager (“City’s Project Manager”), shall be the person to whom Contractor will report for the performance of services hereunder. It is understood that Contractor’s performance hereunder shall be under the supervision of City’s Project Manager (or designee), that Contractor shall coordinate its services hereunder with City’s Project Manager to the extent required by City’s Project Manager, and that all performances required hereunder by Contractor shall be performed to the satisfaction of City’s Project Manager and the City Manager.

2. Total Compensation, Annual Compensation and Fee Schedule. a. Contractor’s total compensation for all services performed under this Agreement, shall not exceed TWO HUNDRED THIRTY-TWO THOUSAND THREE HUNDRED FORTY-FOUR DOLLARS and 00/100 ($232,344.00) total over the Initial Term, at SEVENTYSEVEN THOUSAND FOUR HUNDRED FORTY-EIGHT DOLLARS and 00/100 ($77,448.00) per year, without the prior written authorization of City. The compensation for services performed under this Agreement shall be paid as specified in Exhibit “B,” which is attached hereto and incorporated herein by this reference.
b. The above compensation shall include all costs, including, but not limited to, all clerical, administrative, overhead, insurance, reproduction, telephone, travel, auto rental, subsistence and all related expenses.
c. In addition to the scheduled services to be performed by the Contractor, the parties recognize that additional, unforeseen work and services may be required by City’s Project Manager. In anticipation of such contingencies, the sum of TWENTY-THREE THOUSAND TWO HUNDRED THIRTY-FOUR DOLLARS and 40/100 ($23,234.40) has been added to the total 389
2 compensation of this Agreement. City’s Project Manager may approve the additional work and the actual costs incurred by the Contractor in performance of additional work or services in accordance with such amount as City’s Project Manager and the Contractor may agree upon in advance. Said additional work or services and the amount of compensation therefor, up to the amount of the authorized contingency, shall be memorialized in the form of an Amendment to Agreement approved by the City Manager on a form acceptable to the City Attorney. The Contractor agrees to perform only that work or those services that are specifically requested by the City’s Project Manager. Any and all additional work and services performed under this Agreement shall be completed in such sequence as to assure their completion as expeditiously as is consistent with professional skill and care in accordance with a cost estimate or proposal submitted to and approved by City’s Project Manager prior to the commencement of such services.
d. The total amount of compensation under this Agreement, including contingencies, shall not exceed TWO HUNDRED FIFTY-FIVE THOUSAND FIVE HUNDRED SEVENTY-EIGHT DOLLARS and 40/100 ($255,578.40).

3. Payment.
a. As scheduled services are completed, Contractor shall submit to City an invoice for the services completed, authorized expenses and authorized extra work actually performed or incurred.
b. All such invoices shall state the basis for the amount invoiced, including services completed, the number of hours spent and any extra work performed. c. City will pay Contractor the amount invoiced within thirty (30) days after the approval of the invoice.
d. Payment shall constitute payment in full for all services, authorized costs and authorized extra work covered by that invoice.

4. Change Orders. No payment for extra services caused by a change in the scope or complexity of work, or for any other reason, shall be made unless and until such extra services and a price therefor have been previously authorized in writing and approved by City as an amendment to this Agreement. The amendment shall set forth the changes of work, extension of time, and adjustment of the compensation to be paid by City to Contractor.

5. Licenses. Contractor represents that it and any subcontractors it may engage, possess any and all licenses which are required under state or federal law to perform the work contemplated by this Agreement and that Contractor and its subcontractors shall maintain all appropriate licenses, including a City of Orange business license, at its cost, during the performance of this Agreement.

6. Independent Contractor. At all times during the term of this Agreement, Contractor shall be an independent contractor and not an employee of City. City shall have the right to control Contractor only insofar as the result of Contractor's services rendered pursuant to this Agreement.

City shall not have the right to control the means by which Contractor accomplishes services rendered 390
3 pursuant to this Agreement. Contractor shall, at its sole cost and expense, furnish all facilities, materials and equipment which may be required for furnishing services pursuant to this Agreement.

Contractor shall be solely responsible for, and shall indemnify, defend and save City harmless from all matters relating to the payment of its subcontractors, agents and employees, including compliance with social security, withholding and all other wages, salaries, benefits, taxes, exactions, and regulations of any nature whatsoever. Contractor acknowledges that it and any subcontractors, agents or employees employed by Contractor shall not, under any circumstances, be considered employees of City, and that they shall not be entitled to any of the benefits or rights afforded employees of City, including, but not limited to, sick leave, vacation leave, holiday pay, Public Employees Retirement System benefits, or health, life, dental, long-term disability or workers' compensation insurance benefits.

7. Contractor Not Agent. Except as City may specify in writing, Contractor shall have no authority, express or implied, to act on behalf of City in any capacity whatsoever as an agent.

Contractor shall have no authority, express or implied, to bind City to any obligation whatsoever.

8. Designated Persons. Except as otherwise authorized by City’s Project Manager, only the employees of Contractor shall perform work provided for under this Agreement. It is understood by the parties that clerical and other nonprofessional work may be performed by persons other than those designated.

9. Assignment or Subcontracting. No assignment or subcontracting by Contractor of any part of this Agreement or of funds to be received under this Agreement shall be of any force or effect unless the assignment has had the prior written approval of City. City may terminate this Agreement rather than accept any proposed assignment or subcontracting. Such assignment or subcontracting may be approved by the City Manager or his/her designee.

10. Term.
a. The Initial Term of Agreement is three (3) fiscal years, commencing on July 1, 2022, and expiring on June 30, 2025 (the “Expiration Date”); provided, however, that the City has the right to extend the Agreement for the following terms:
• First Extension (the “First Extension Term”) commencing on July 1, 2025, and terminating on June 30, 2026, in an annual amount not to exceed EIGHTY-FIVE THOUSAND ONE HUNDRED NINETY-TWO and
80/100 Dollars ($85,192.80).
• Second Extension (the “Second Extension Term”) commencing on July 1, 2026, and terminating on June 30, 2027, in an annual amount not to exceed that amount defined below.
b. The City Manager is hereby authorized on behalf of the City to give written notice to the Contractor of the City’s intention to exercise each Extension (if at all) no later than thirty (30) days prior to the end of the Expiration Date or the then expiring Extension; provided, however, that the City’s notice of its intention to extend the term of the Contract for each Extension shall be 391
4 expressly conditioned upon and subject to the approval by the City Council, in its sole and absolute discretion, of an amount sufficient to pay the compensation set forth herein for each Extension as part of its annual budget approval process prior to the beginning of each Extension. While the parties acknowledge that the City is required to give its notice of intention to extend the term of the Contract not later than thirty (30) days prior to the date that the initial term or then current Extension would otherwise end, it is possible that the City Council’s approval of its annual budget and appropriation of funds for the Extension in question may occur thereafter. Accordingly, if the City Council fails to approve and appropriate funds sufficient to pay the amount of compensation set forth herein for an Extension, the Contract shall terminate and be of no further force and effect as of the expiration of the initial term or the then current Extension. Moreover, in the event the City gives the Contractor written notice exercising an Extension and the City Council fails to appropriate funds sufficient to pay the amount of compensation for the Extension in question after the Contractor has performed services under the Extension, the Contractor will be equitably compensated for all services performed under any portion of an Extension through the date of termination of the Contract. c. Increases based upon Consumer Price Index (“CPI”) shall commence with the Second Extension Term, as follows. Following the City’s exercise of its option to extend the term of this Agreement for the Second Extension Term the Compensation payable to the Contractor under the Contract shall be increased on the commencement date of the Second Extension Term to the lesser of:
(1) the product obtained by multiplying the monthly compensation payable to the Contractor for the month prior to the Expiration Date of the First Extension by the quotient obtained by dividing the Consumer Price Index (“CPI”) for July 2025 into the CPI for the calendar month two (2) months before the Second Extension; or (2) two percent (2%). In no event shall the Base Compensation payable to the Contractor for the Second Extension Term ever be less than the Base Compensation payable immediately preceding the Second Extension Term. In no event shall the increase for the Second Extension Term be greater than two percent (2%). The term “Consumer Price Index” or “CPI” means the Consumer Price Index for all Urban Consumers (All Items) as published by the United States Department of Labor, Bureau of Labor Statistics for the Los Angeles/Riverside/Orange Counties metropolitan area.
d. Any Extension, if properly exercised, shall be memorialized in the form of an amendment to this Agreement. The City Manager is hereby authorized to approve and execute amendments to this Agreement reflecting the exercise of each Extension and the amount of compensation (including the amount of funds to be made available for additional work or services) payable to Contractor for each respective Extension.

11. Time Is of the Essence. Time is of the essence in this Agreement. Contractor shall do all things necessary and incidental to the prosecution of Contractor's work.

12. Reserved.

13. Delays and Extensions of Time. Contractor's sole remedy for delays outside its control, other than those delays caused by City, shall be an extension of time. No matter what the cause of the delay, Contractor must document any delay and request an extension of time in writing at the time of the delay to the satisfaction of City. Any extensions granted shall be limited to the length of the delay outside Contractor’s control. If Contractor believes that delays caused by City will cause 392
5 it to incur additional costs, it must specify, in writing, why the delay has caused additional costs to be incurred and the exact amount of such cost at the time the delay occurs. No additional costs can be paid that exceed the not to exceed amount stated in Section 2.a, above, absent a written amendment to this Agreement.

14. Products of Contractor. The documents, studies, evaluations, assessments, reports, plans, citations, materials, manuals, technical data, logs, files, designs and other products produced or provided by Contractor for this Agreement shall become the property of City upon receipt. Contractor shall deliver all such products to City prior to payment for same. City may use, reuse or otherwise utilize such products without restriction.

15. Equal Employment Opportunity. During the performance of this Agreement, Contractor agrees as follows:
a. Contractor shall not discriminate against any employee or applicant for employment because of race, color, religion, sex, national origin, mental or physical disability, or any other basis prohibited by applicable law. Contractor shall ensure that applicants are employed, and that employees are treated during employment, without regard to their race, color, religion, sex, national origin, mental or physical disability, or any other basis prohibited by applicable law. Such actions shall include, but not be limited to the following: employment, upgrading, demotion or transfer, recruitment or recruitment advertising, layoff or termination, rates of pay or other forms of compensation and selection for training, including apprenticeship. Contractor agrees to post in conspicuous places, available to employees and applicants for employment, a notice setting forth provisions of this non-discrimination clause.
b. Contractor shall, in all solicitations and advertisements for employees placed by, or on behalf of Contractor, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, national origin, mental or physical disability, or any other basis prohibited by applicable law.
c. Contractor shall cause the foregoing paragraphs (a) and (b) to be inserted in all subcontracts for any work covered by this Agreement, provided that the foregoing provisions shall not apply to subcontracts for standard commercial supplies or raw materials.

16. Conflicts of Interest. Contractor agrees that it shall not make, participate in the making, or in any way attempt to use its position as a contractor to influence any decision of City in which Contractor knows or has reason to know that Contractor, its officers, partners, or employees have a financial interest as defined in Section 87103 of the Government Code.

17. Indemnity.
a. To the fullest extent permitted by law, Contractor agrees to indemnify, defend and hold City, its City Council and each member thereof, and the officers, officials, agents and employees of City (collectively the “Indemnitees”) entirely harmless from all liability arising out of:
393
6 (1) Any and all claims under workers’ compensation acts and other employee benefit acts with respect to Contractor’s employees or subcontractor’s employees arising out of Contractor’s work under this Agreement, including any and all claims under any law pertaining to Contractor or its employees’ status as an independent contractor and any and all claims under Labor Code section 1720 related to the payment of prevailing wages for public works projects; and (2) Any claim, loss, injury to or death of persons or damage to property caused by any act, neglect, default, or omission other than a professional act or omission of Contractor, or person, firm or corporation employed by Contractor, either directly or by independent contract, including all damages due to loss or theft sustained by any person, firm or corporation including the Indemnitees, or any of them, arising out of, or in any way connected with the work or services which are the subject of this Agreement, including injury or damage either on or off City’s property; but not for any loss, injury, death or damage caused by the active negligence or willful misconduct of City.

Contractor, at its own expense, cost and risk, shall indemnify any and all claims, actions, suits or other proceedings that may be brought or instituted against the Indemnitees on any such claim or liability covered by this subparagraph, and shall pay or satisfy any judgment that may be rendered against the Indemnitees, or any of them, in any action, suit or other proceedings as a result of coverage under this subparagraph.
b. Reserved.
c. Except for the Indemnitees, the indemnifications provided in this Agreement shall not be construed to extend any third party indemnification rights of any kind to any person or entity which is not a signatory to this Agreement.
d. The indemnities set forth in this section shall survive any closing, rescission, or termination of this Agreement, and shall continue to be binding and in full force and effect in perpetuity with respect to Contractor and its successors.

18. Insurance.
a. Contractor shall carry workers’ compensation insurance as required by law for the protection of its employees during the progress of the work. Contractor understands that it is an independent contractor and not entitled to any workers’ compensation benefits under any City program.
b. Contractor shall maintain during the life of this Agreement the following minimum amount of comprehensive general liability insurance or commercial general liability insurance: the greater of (1) One Million Dollars ($1,000,000) per occurrence; or (2) all the insurance coverage and/or limits carried by or available to Contractor. Said insurance shall cover bodily injury, death and property damage and be written on an occurrence basis. c. Contractor shall maintain during the life of this Agreement, the following minimum amount of automotive liability insurance: the greater of (1) a combined single limit of One Million Dollars ($1,000,000); or (2) all the insurance coverage and/or limits carried by or available to 394
7 Contractor. Said insurance shall cover bodily injury, death and property damage for all owned, nonowned and hired vehicles and be written on an occurrence basis. d. Any insurance proceeds in excess of or broader than the minimum required coverage and/or minimum required limits which are applicable to a given loss shall be available to City. No representation is made that the minimum insurance requirements of this Agreement are sufficient to cover the obligations of Contractor under this Agreement. e. Each policy of general liability and automotive liability shall provide that City, its officers, officials, agents, and employees are declared to be additional insureds under the terms of the policy, but only with respect to the work performed by Contractor under this Agreement. A policy endorsement to that effect shall be provided to City along with the certificate of insurance. In lieu of an endorsement, City will accept a copy of the policy(ies) which evidences that City is an additional insured as a contracting party. The minimum coverage required by Subsection 18.b and c, above, shall apply to City as an additional insured. Any umbrella liability insurance that is provided as part of the general or automobile liability minimums set forth below shall be maintained for the duration of the Agreement.
f. The insurance policies maintained by Contractor shall be primary insurance and no insurance held or owned by City shall be called upon to cover any loss under the policy. Contractor will determine its own needs in procurement of insurance to cover liabilities other than as stated above. g. Before Contractor performs any work or prepares or delivers any materials, Contractor shall furnish certificates of insurance and endorsements, as required by City, evidencing the aforementioned minimum insurance coverages on forms acceptable to City, which shall provide that the insurance in force will not be canceled or allowed to lapse without at least ten (10) days’ prior written notice to City.
h. All insurance maintained by Contractor shall be issued by companies admitted to conduct the pertinent line of insurance business in California and having a rating of Grade A or better and Class VII or better by the latest edition of Best Key Rating Guide. i. Contractor shall immediately notify City if any required insurance lapses or is otherwise modified and cease performance of this Agreement unless otherwise directed by City. In such a case, City may procure insurance or self-insure the risk and charge Contractor for such costs and any and all damages resulting therefrom, by way of set-off from any sums owed Contractor. j. Contractor agrees that in the event of loss due to any of the perils for which it has agreed to provide insurance, Contractor shall look solely to its insurance for recovery. Contractor hereby grants to City, on behalf of any insurer providing insurance to either Contractor or City with respect to the services of Contractor herein, a waiver of any right to subrogation which any such insurer may acquire against City by virtue of the payment of any loss under such insurance. k. Contractor shall include all subcontractors, if any, as insureds under its policies or shall furnish separate certificates and endorsements for each subcontractor to City for review and approval. All coverages for subcontractors shall be subject to all of the requirements stated herein. 395
8 19. Termination. City may for any reason terminate this Agreement by giving Contractor not less than five (5) days’ written notice of intent to terminate. Upon receipt of such notice, Contractor shall immediately cease work, unless the notice from City provides otherwise. Upon the termination of this Agreement, City shall pay Contractor for services satisfactorily provided and all allowable reimbursements incurred to the date of termination in compliance with this Agreement, unless termination by City shall be for cause, in which event City may withhold any disputed compensation. City shall not be liable for any claim of lost profits.

20. Maintenance and Inspection of Records. In accordance with generally accepted accounting principles, Contractor and its subcontractors shall maintain reasonably full and complete books, documents, papers, accounting records, and other information (collectively, the “records”) pertaining to the costs of and completion of services performed under this Agreement. City and its authorized representatives shall have access to and the right to audit and reproduce any of Contractor's records regarding the services provided under this Agreement. Contractor shall maintain all such records for a period of at least three (3) years after termination or completion of this Agreement.

Contractor agrees to make available all such records for inspection or audit at its offices during normal business hours and upon three (3) days’ notice from City, and copies thereof shall be furnished if requested.

21. Compliance with Laws/Background.
a. Contractor shall be knowledgeable of and comply with all local, state and federal laws which may apply to the performance of this Agreement. b. The work provided for in this Agreement constitutes a “public works,” as that term is defined in Section 1720 of the California Labor Code, for which prevailing wages must be paid, to the extent Contractor’s employees will perform any work that falls within any of the classifications for which the Department of Labor Relations of the State of California promulgates prevailing wage determinations, Contractor hereby agrees that it, and any subcontractor under it, shall pay not less than the specified prevailing rates of wages to all such workers and shall comply with all statutory requirements thereunder. Statutory provisions for penalties for failure to comply with prevailing wage laws will be enforced. The general prevailing wage determinations for crafts can be located on the website of the Department of Industrial Relations (www.dir.ca.gov/DLSR).

Additionally, to perform work under this Contract, Contractor must meet all State registration requirements and criteria, including project compliance monitoring. c. Contractor represents and warrants that it:
(1) Has complied and shall at all times during the term of this Agreement comply, in all respects, with all immigration laws, regulations, statutes, rules, codes, and orders, including, without limitation, the Immigration Reform and Control Act of 1986 (IRCA); and (2) Has not and will not knowingly employ any individual to perform services under this Agreement who is ineligible to work in the United States or under the terms of this Agreement; and
396
9 (3) Has properly maintained, and shall at all times during the term of this Agreement properly maintain, all related employment documentation records including, without limitation, the completion and maintenance of the Form I-9 for each of Contractor’s employees; and (4) Has responded, and shall at all times during the term of this Agreement respond, in a timely fashion to any government inspection requests relating to immigration law compliance and/or Form I-9 compliance and/or worksite enforcement by the Department of Homeland Security, the Department of Labor, or the Social Security Administration. d. Contractor shall, upon request of City, provide a list of all employees working under this Agreement and shall provide, to the reasonable satisfaction of City, verification that all such employees are eligible to work in the United States. All costs associated with such verification shall be borne by Contractor. Once such request has been made, Contractor may not change employees working under this Agreement without written notice to City, accompanied by the verification required herein for such employees.
e. Contractor shall require all subcontractors to make the same representations and warranties as set forth herein.
f. If Contractor or subcontractor knowingly employs an employee providing work under this Agreement who is not authorized to work in the United States, and/or fails to follow federal laws to determine the status of such employee, that shall constitute a material breach of this Agreement and may be cause for immediate termination of this Agreement by City. g. All personnel performing any services to City under this Contract shall possess sufficient experience and security records to perform the work at public facilities. Contractor shall conduct and complete, to City’s satisfaction, sufficient background checks to ensure no personnel performing services under this Contract is listed on the National Sex Offender Public Registry (“NSOPR”). Contractor shall monitor personnel security records to ensure no existing or new employees performing services under this Contract are added to the NSOPR or convicted of any crimes that would disqualify them from adhering to conduct conducive to public safety. h. All costs associated with the documentation and verification required herein shall be borne by Contractor. Contractor shall require all subcontractors to provide the same documentation and verification when hired to perform services under this Contract. City has the right, in its sole and absolute discretion, to reject any employee of Contractor assigned to perform services for City, with or without cause, at the time of such assignment or at any time thereafter, and Contractor shall remove that employee from providing services to City to the extent permitted by law and any applicable collective bargaining agreement. City’s rights under this Article shall not be exercised in an arbitrary or capricious manner, or with the intent of forcing a termination of this Contract i. Contractor agrees to indemnify and hold City, its officials, and employees harmless for, of and from any loss, including but not limited to fines, penalties and corrective measures, City may sustain by reason of Contractor's failure to comply with said laws, rules and regulations in connection with the performance of this Agreement. 397
10 22. Governing Law and Venue. This Agreement shall be construed in accordance with and governed by the laws of the State of California and Contractor agrees to submit to the jurisdiction of California courts. Venue for any dispute arising under this Agreement shall be in Orange County, California.

23. Integration. This Agreement constitutes the entire agreement of the parties. No other agreement, oral or written, pertaining to the work to be performed under this Agreement shall be of any force or effect unless it is in writing and signed by both parties. Any work performed which is inconsistent with or in violation of the provisions of this Agreement shall not be compensated.

24. Notice. Except as otherwise provided herein, all notices required under this Agreement shall be in writing and delivered personally, by e-mail, or by first class mail, postage prepaid, to each party at the address listed below. Either party may change the notice address by notifying the other party in writing. Notices shall be deemed received upon receipt of same or within 3 days of deposit in the U.S. Mail, whichever is earlier. Notices sent by e-mail shall be deemed received on the date of the e-mail transmission.
“CONTRACTOR” “CITY”
CAM Property Services City of Orange
21811 S. Western Avenue 300 E. Chapman Avenue
Torrance, CA 90501 Orange, CA 92866-1591
Attn.: Matthew Budnick Attn.: Ruben Hernandez
Telephone: 800-576-3050 ext. 256 Telephone: 714-532-6455 E-Mail: [email protected] E-Mail: [email protected]

25. Counterparts. This Agreement may be executed in one or more counterparts, each of which shall be deemed an original, but all of which together shall constitute one and the same instrument. Signatures transmitted via facsimile and electronic mail shall have the same effect as original signatures.
[Remainder of page intentionally left blank; signatures on next page] 398
11 IN WITNESS of this Agreement, the parties have entered into this Agreement as of the year and day first above written.
“CONTRACTOR” “CITY”
COMMON AREA MAINTENANCE CITY OF ORANGE, a municipal corporation SERVICES, INC., a California corporation,
dba CAM PROPERTY SERVICES
*By: By:

Printed Name: Mark A. Murphy, Mayor
Title:
*By: ATTEST:

Printed Name:

Title:

Pamela Coleman, City Clerk
APPROVED AS TO FORM:

Mary E. Binning
Senior Assistant City Attorney
*NOTE: The City requires the following signature(s) on behalf of the Contractor:
-- (1) the Chairman of the Board, the President or a Vice-President, AND (2) the Secretary, the Chief Financial Officer, the Treasurer, an Assistant Secretary or an Assistant Treasurer. If only one corporate officer exists or one corporate officer holds more than one corporate office, please so indicate. OR -- The corporate officer named in a corporate resolution as authorized to enter into this Agreement. A copy of the corporate resolution, certified by the Secretary close in time to the execution of the Agreement, must be provided to the City. 399
EXHIBIT “A”

SCOPE OF SERVICES
[Beneath this sheet.]
400
401
402
LEM
ON ST

CENTER ST

SHAFFER ST
O
R

ANGE ST
G
R
AND ST

CENTER ST

SHAFFER ST
LEM
ON ST

OLIVE STGLASSELL ST
O
R

ANGE ST
G
R
AND ST

CENTER ST

SHAFFER ST

GLASSELL ST GLASSELL ST

OLIVE ST
G
R
AND ST
O
R

ANGE ST

MORELAND DR

CHAPMAN AVE

MAPLE AVE

ALMOND AVE

OLIVE ST
LEM
ON ST
122 11-33
125
127
110
506
4 134 14
400 121
185
515
215
186
305
175
126
182
22 145
55 38
60 59
40 44 34
30 77
80 7571
10 20
219
190 B,C,D
440
422
320
140
222 ½
439
154
164
172
182
191 192
181
171
163
153
143
407
168
164
307
127
133
143
185
191
211
126
101
112
177
155
131
123
117
129
162
156
114
119
123
234
133
111
207
193
155 ½
149
165 163
171
224
210
237
121
238
143
173
237
170
145 145 ½
115
183
195
155
141
135
131
119
119 B
107
101
120
174
200
208
216 142
191
138136134 132
227
505
226
430 431
414
209
223
231
228
315
323
242
234
226
218
206 326
225
231
204 230
212
224
217
240 20
239 5
221
219 215
205 204
212
220
230
123
238 239
229
221
205
210
226
235
225
215
203
224
232
223
210 212
206
230
232
110 ½
506
146
102
205
160
106
140
142
138
128
122
172
225
215
201 319
327
335
224 225
227
222
405
413
419
427
437
308
130
146
156
116
174
151
130128126
224 A-F
214
204
218
123
115
207
229
124
230
137
230
222
235 233
221
215
213
225
227
235
154
148 A
108
135
190
171
230
112
224
202
A
122
109
176
166
206 201
223
118
100
118
110
134
140 138 136
229
204
158
176
165
223 A-F
213
300
115
150
146
144
152 A-D
116
215
146
219 217
149
224
176
230
146
142
306
201
114
141
161
148
154
119 A
131
109
155
138
129
115
121 1/2
117
178
228 225
105
133
227
152
233
58 36
26 203
211
143
109
191 187
149 ½ 151
100
123
212
237
204 A
234
143 ½
139
143
120
A,B 124
108
153
235
217
173
191
233 A-H
185 1-8
336
342
128 130 132
134
114
161
46 42
118
225
117
111
144
242
125
164 A
240
124
230
210 208
214
226
133
148
154
224
133 139 ½
101 ½
158
234
130
190
201
222
508
183
227
230 A
145
147
221
123
230 A
230 B 230 C
1 2 3 4 5 9 8 7 6
A
B DC
A
B
C
D
EF
1 2 3
6 5 4 7
193
153
154
A
A
F EDCB
B
C
D
E
F
A
B C
218
304
1-15
184
161
B
C
D
135
1 2
3 4
5 6
7 8
9 10
11 12
13 14
Plaza Park

CITY HALL

CIVIC CENTER

LIBRARY
SPOKES
SPOKES
See Exhibit D
See Exhibit C
SPOKES
SPOKES

QUADRANT

CITY OF ORANGE
Approx 9,260 SQ FT
Approx 15,000 SQ FT
Approx 50,000 SQ FT
I
300 E Chapman Ave
Orange, CA 92866

SIDEWALK CLEANING

SQUARE FOOTAGE

AREA ESTIMATE

CITY OF ORANGE
Date Saved: 5/4/2022
(Incl. SW Quad)
Approx 17,909 SQ FT
Approx 10,841 SQ FT
Legend
Areas To Be Cleaned
Quadrant Area
Spokes
Plaza Park
Library
Civic Center
Scope of work
Exhibit A
403
EXHIBIT “B”

COMPENSATION FOR SERVICES
[Beneath this sheet.]
404
City of Orange EXHIBIT B - SOW
City of Orange - Old Town Plaza
Square Footage Breakdown:

Area Title/Frequency SF Area Description
1A. Quadrant Areas (Weekly) 3,650 Northwest Quadrant
3,650 Southeast Quadrant
3,650 Northeast Quadrant
3,650 Southwest Quadrant
14,600 $ 2,100.00
1B. Spokes (Weekly) 3,000
2,200
3,000
2,200
7,500
7,500
2,500
1,300
2,500
1,300
7,900
7,900
48,800
W. Chapman Ave: Lemon-Olive, South side
W. Chapman Ave: Olive-Plaza, South side
W. Chapman Ave: Lemon-Olive, North side
W. Chapman Ave: Olive-Plaza, North side
N. Glassell St: Maple-Plaza, West side
N. Glassell St: Maple-Plaza, East side
E. Chapman Ave: Grand-Orange, North side
E. Chapman Ave: Orange-Plaza, North side
E. Chapman Ave: Grand-Orange, South side
E. Chapman Ave: Orange-Plaza, South side
S. Glassell St: Almond-Plaza, East side
S. Glassell St: Almond-Plaza, West side
$ 950.00
1C. Plaza Park (weekly) 9,260 $550.00

2. Orange Main Library (weekly) 10,841 SF $ 355.00

3. Civic Center (twice a year, or as needed) 17,909 SF $ 385.00

4. Plaza Public Trash Containers (Monthly) N/A $ 185.00

5. City Trash Compactors (Every other week) N/A $ 400.00

6. Dog Park Hardscape (Weekly) 7,600 $ 390.00

7. Train Depot (Every other week) N/A $ 1,139.00
subtotal

EXHIBIT B - SOW
Monthly Total: $6,454.00
405
Agenda Item
City Council
Item #: 3.32. 6/14/2022 File #: 22-0340
TO: Honorable Mayor and Members of the City Council
THRU: Rob Houston, City Manager
FROM: Christopher Cash, Public Works Director

1. SUBJECT
Award of Contract to Tunnelworks Services, Inc. for Sewer Line Cleaning, Video Inspection, and Emergency Response Services Project Fiscal Year 2023 through 2025; Bid No. 21-22.33.

2. SUMMARY
Bids for Sewer Line Cleaning, Video Inspection, and Emergency Response Project Fiscal Year 2023 through 2025 were received and opened on May 12, 2022. Four bidders responded to the Notice Inviting Bids. The apparent low bidder is Tunnelworks Services, Inc. of Whittier, California.

3. RECOMMENDED ACTION
Approve the contract with Tunnelworks Services, Inc. in the annual amount of $378,039 and authorize the Mayor and City Clerk to execute on behalf of the City.

4. FISCAL IMPACT
The annual expenditure for this contract is $378,039, for a total amount of $1,134,117, and will be funded in the Sewer Cleaning and Video (15509) project through Sanitation and Sewer (220).

5. STRATEGIC PLAN GOALS
Goal 1: Provide for a safe community
b: Provide and maintain infrastructure necessary to ensure the safety of the public.

Goal 4: Provide outstanding public service
b: Provide facilities and services to meet customer expectations.

6. DISCUSSION AND BACKGROUND
The City Council previously approved the advertisement for bids at the April 12, 2022 meeting. The bid solicitation was advertised on April 14, 2022, for a period of three weeks and bids were opened on May 12, 2022. Four bidders submitted proposals as follows:
1) Tunnel Works Services, Inc. $328,730
2) Houston & Harris PCS, Inc. $479,980
3) National Plant Services $536,940
4) Down Stream Services $861,325
Tunnelworks Services, Inc. is the lowest base bid in the amount of $328,730. An additional fifteen City of Orange Page 1 of 2 Printed on 6/9/2022
powered by Legistar™406
Item #: 3.32. 6/14/2022 File #: 22-0340
Tunnelworks Services, Inc. is the lowest base bid in the amount of $328,730. An additional fifteen percent contingency in the amount of $49,309 is included in the agreement to allow for emergency service requests and contingency work. The total agreement is for an annual amount of $378,039, or $1,134,117 for the three-year contract, with options to renew in years four and five at the same price.

The City’s Sanitary Sewer Management Plan requires routine cleaning and video inspection of the City’s approximately 312 miles of sewer line in order to mitigate sewer spills and to stay in compliance with the State Water Resources Control Board (SWRCB) Order No. 2006-0003- DWQ entitled Statewide General Waste Discharge Requirements for Sanitary Sewer Systems and its Monitoring and Reporting Program (MRP) amendment WQ 2013-0058-EXEC. In addition, the data gathered during video inspection of the sewer lines is used to identify infrastructure deficiencies and plan for Capital Improvement Program (CIP) projects.

7. ATTACHMENTS
· Bid Abstract
· Contract with Tunnelworks Services, Inc.

City of Orange Page 2 of 2 Printed on 6/9/2022
powered by Legistar™407
Agenda Item
City Council
Item #: 3.32. 6/14/2022 File #: 22-0340
TO: Honorable Mayor and Members of the City Council
THRU: Rob Houston, City Manager
FROM: Christopher Cash, Public Works Director

1. SUBJECT
Award of Contract to Tunnelworks Services, Inc. for Sewer Line Cleaning, Video Inspection, and Emergency Response Services Project Fiscal Year 2023 through 2025; Bid No. 21-22.33.

2. SUMMARY
Bids for Sewer Line Cleaning, Video Inspection, and Emergency Response Project Fiscal Year 2023 through 2025 were received and opened on May 12, 2022. Four bidders responded to the Notice Inviting Bids. The apparent low bidder is Tunnelworks Services, Inc. of Whittier, California.

3. RECOMMENDED ACTION
Approve the contract with Tunnelworks Services, Inc. in the annual amount of $378,039 and authorize the Mayor and City Clerk to execute on behalf of the City.

4. FISCAL IMPACT
The annual expenditure for this contract is $378,039, for a total amount of $1,134,117, and will be funded in the Sewer Cleaning and Video (15509) project through Sanitation and Sewer (220).

5. STRATEGIC PLAN GOALS
Goal 1: Provide for a safe community
b: Provide and maintain infrastructure necessary to ensure the safety of the public.

Goal 4: Provide outstanding public service
b: Provide facilities and services to meet customer expectations.

6. DISCUSSION AND BACKGROUND
The City Council previously approved the advertisement for bids at the April 12, 2022 meeting. The bid solicitation was advertised on April 14, 2022, for a period of three weeks and bids were opened on May 12, 2022. Four bidders submitted proposals as follows:
1) Tunnel Works Services, Inc. $328,730
2) Houston & Harris PCS, Inc. $479,980
3) National Plant Services $536,940
4) Down Stream Services $861,325
Tunnelworks Services, Inc. is the lowest base bid in the amount of $328,730. An additional fifteen City of Orange Page 1 of 2 Printed on 6/9/2022
powered by Legistar™408
Item #: 3.32. 6/14/2022 File #: 22-0340
Tunnelworks Services, Inc. is the lowest base bid in the amount of $328,730. An additional fifteen percent contingency in the amount of $49,309 is included in the agreement to allow for emergency service requests and contingency work. The total agreement is for an annual amount of $378,039, or $1,134,117 for the three-year contract, with options to renew in years four and five at the same price.

The City’s Sanitary Sewer Management Plan requires routine cleaning and video inspection of the City’s approximately 312 miles of sewer line in order to mitigate sewer spills and to stay in compliance with the State Water Resources Control Board (SWRCB) Order No. 2006-0003- DWQ entitled Statewide General Waste Discharge Requirements for Sanitary Sewer Systems and its Monitoring and Reporting Program (MRP) amendment WQ 2013-0058-EXEC. In addition, the data gathered during video inspection of the sewer lines is used to identify infrastructure deficiencies and plan for Capital Improvement Program (CIP) projects.

7. ATTACHMENTS
· Bid Abstract
· Contract with Tunnelworks Services, Inc.

City of Orange Page 2 of 2 Printed on 6/9/2022
powered by Legistar™409
City of Orange: Summary of Bid Abstracts for:

Sewer Line Cleaning, Video Inspection, and Emergency Response Services Project 1 2 3 4 Bid No. 21-22.33; S-246 Tunnel Works Services Inc Houston & Harris PCS, Inc. National Plant Services Down Stream Services Date of Bid Opening: May 12, 2022 @ 2:00 pm 13502 Whitter Blvd Ste 165 21831 Barton Road 1461 Harbor Avenue 2855 Progress Place ENGINEER'S ESTIMATE Whittier, CA 90605 Grand Terrace, CA 92313 Long Beach, CA 90813 Escondido, CA Tel. No. (562) 553-2734 Tel. No. (909) 422-8990 Tel. No. (562) 436-7600 Tel. No. (760) 746-2544 NO. DESCRIPTION OF WORK QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT 1 Sewer Line Cleaning of "Hot Spots" - Sizes,
Locations and Schedule as Shown in Attachment
A.
1 LS $80,000.00 $80,000.00 $121,660.00 $121,660.00 $131,400.00 $131,400.00 $252,315.00 $252,315.00 2 Routine Sewr Line Cleaning - Various Pipes
Sizes and Locationsas Assigned by the City.

Residential Streets
40,000 LF $0.43 $17,200.00 $0.50 $20,000.00 $0.37 $14,800.00 $1.09 $43,600.00 3 Routine Sewr Line Cleaning - Various Pipes
Sizes and Locations as Assigned by the City.

Arterial Streets
70,000 LF $0.56 $39,200.00 $0.73 $51,100.00 $0.71 $49,700.00 $1.31 $91,700.00 4 Sewer Line Video Inspection - Various Pipe
Sizes and Locations as assigned by the City.

Residential & Arterial Streets
65,000 LF $0.48 $31,200.00 $0.69 $44,850.00 $1.17 $76,050.00 $1.10 $71,500.00 5 Sewer Line Video Inspection with Flow
Bypass/Plugging - Various Pipe Sizes and
Locations as assigned by the City. Residential
Streets
1,000 LF $2.11 $2,110.00 $1.46 $1,460.00 $4.76 $4,760.00 $2.97 $2,970.00 6 Sewer Line Video Inspection with Flow
Bypass/Plugging - Various Pipe Sizes and
Locations as assigned by the City. Arterial
Streets
1,000 LF $2.82 $2,820.00 $1.61 $1,610.00 $8.93 $8,930.00 $3.14 $3,140.00 7 Sewr Line Cleaning and Video Inspection
Various Sizes and Locations Assigned by the
City. Residential Streets
150,000 LF $0.74 $111,000.00 $1.03 $154,500.00 $1.19 $178,500.00 $2.03 $304,500.00 8 Sewr Line Cleaning and Video Inspection
Various Sizes and Locations Assigned by the
City. Arterial Streets
40,000 LF $1.13 $45,200.00 $2.12 $84,800.00 $1.82 $72,800.00 $2.29 $91,600.00 TOTAL $328,730.00 $479,980.00 $536,940.00 $861,325.00
Alternate
1 Emergency Response Services - Various
Locations as Assigned by the City. (2 Hours
Minimum). 2-Man Crew with Equipment.

Hourly Rate
2 Emergency Response Services - Various
Locations as Assigned by the City. (2 Hours
Minimum). 2-Man Crew with Equipment.

Hourly Rate
3 Emergency Response Services - Various
Locations as Assigned by the City. (2 Hours
Minimum). 3-Man Crew with Equipment.

Hourly Rate
$500,000.00
$275.00
$350.00
$390.00
$485.00
$425.00 $580.00 $500.00 $1,684.00
$250.00
$350.00
$970.00
$1,474.00

Page 1 ends

410

CONTRACT
[Sewer Line Cleaning, Video Inspection, and Emergency Response Services Project (Bid No. 21-22.33; (S-246)]
THIS CONTRACT (the “Contract”) is made and entered into as of ______________, 2022 (“Effective Date”) by and between the CITY OF ORANGE, a municipal corporation (“City”), and TUNNELWORKS SERVICES, INC., a California corporation, (“Contractor”), who agree as follows.

ARTICLE 1
Work Performed
a. For and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by City, and under the conditions expressed in the payment and performance bonds presented to City with this Contract and incorporated herein by this reference, Contractor hereby agrees to and shall do all the work and furnish all the labor, materials, tools and equipment, except such as are mentioned in the specifications to be furnished by City to Contractor, necessary to complete in good workmanship and substantial manner the work (the “Work”) described in:
(1) The latest edition of the "City of Orange Standard Plans and Specifications" (the “Orange Book”) with the term "Engineer," as used in the Orange Book and in this Contract, to specifically include the City Engineer (or his/her designee); (2) The "Standard Specifications for Public Works Construction” (the “Greenbook”), and all amendments thereto, except the definition of “Subcontractor” in Section 1.2 (General – Terms and Definitions) of Part 1 (General Provisions) of the Greenbook, which is hereby amended in its entirety to read as follows: “Subcontractor – An individual, firm, or corporation having a direct contract with the Contractor for the performance of a part of the Work;” (3) The “City of Orange Standard Special Provisions;”
(4) The Standard Plans; and
(5) Contractor’s Bid Proposal, which is on file with City’s Department of Public Works.
b. Contractor acknowledges that it has received the Plans from City and that a complete copy of the Plans are in its possession and are hereby specifically referred to and by such reference made a part hereof. The Orange Book, Greenbook and City of Orange Standard Special Provisions and Standard Plans are on file with City’s Public Works Director and are hereby specifically referred to and by such reference made a part hereof. Contractor hereby acknowledges that it has read, reviewed and understands the Plans, the Orange Book, the Greenbook, the Special Provisions, the Standard Plans, and the Encroachment Permit as they relate to the Work, all of which documents shall be referred to herein collectively as the “Plans and Specifications.” 411
2 c. Contractor acknowledges the provisions of Chapter 8.28 of the Orange Municipal Code which requires, among other things, that Contractor utilize City’s exclusive solid waste hauler for the rental of bins for trash and debris removal and imposes mandatory recycling requirements for self-hauled construction and demolition waste. The terms and conditions set forth in this Contract shall control over any terms and conditions in the Plans and Specifications to the contrary.
d. The Work shall be performed in conformity with the Plans and Specifications and the Bid Proposal and all applicable laws, including any and all applicable federal and state labor laws and standards and applicable prevailing wage requirements and any and all state, federal and local statutes, regulations and ordinances relating to the protection of human health or the environment.
e. Unless and until otherwise notified in writing by City’s Public Works Director, City’s Assistant Field Services Manager, Ruben Hernandez (“Authorized City Representative”), shall be the person to whom Contractor will report for the performance of the Work hereunder. It is understood that Contractor’s performance hereunder shall be under the direction and supervision of the Authorized City Representative or such other person as City’s Public Works Director may designate from time to time, that Contractor shall coordinate the Work hereunder with the Authorized City Representative to the extent required by the Authorized City Representative, and that all performances required hereunder by Contractor shall be performed to the satisfaction of the Authorized City Representative or City’s Public Works Director. f. It is expressly agreed by and between the parties hereto that should there be any conflict between the terms of this instrument and Contractor’s Bid Proposal, then this instrument shall control and nothing herein shall be considered as an acceptance of the said terms of said Bid Proposal conflicting herewith.

ARTICLE 2
Commencement of Work
Contractor shall commence the Work provided for in this Contract within fifteen (15) days of the date of the issuance by City of a Notice to Proceed and diligently prosecute completion of the Work as specified in the Scope of Work, unless legal extension is granted in accordance with the terms set forth in the Greenbook. Time is of the essence in this Contract. Contractor shall do all things necessary and incidental to the prosecution of Contractor's Work.

The Initial Term of this Contract is three (3) years (herein referred to as the “Initial Term”), commencing July 1, 2022, and expiring on June 30, 2025 (the “Expiration Date”); provided, however, that the City has the right to extend the term of this Contract for the following extensions and upon the following terms:
• Extension (the “First Extension Term”) commencing on July 1, 2025 and terminating on June 30, 2026; and
• Extension (the “Second Extension Term”) commencing on July 1, 2026 and terminating on June 30, 2027.
412
3 ARTICLE 3
Compensation
a. Contractor agrees to receive and accept an amount not to exceed THREE HUNDRED TWENTY-EIGHT THOUSAND SEVEN HUNDRED THIRTY DOLLARS and 00/100 ($328,730.00) per year as compensation for furnishing all materials and doing all the Work contemplated and embraced in this Contract. Said compensation covers (1) all loss or damage arising out of the nature of the Work, from the acts of the elements; (2) any unforeseen difficulties or obstructions which may arise or be encountered in the prosecution of the Work until its acceptance by City, other than as provided below; (3) all risks of every description connected with the Work; (4) all expenses incurred by or in consequence of the suspension or discontinuance of the Work; and (5) well and faithfully completing the Work, and for the whole thereof, in the manner and according to the Plans and Specifications, and requirements of the Authorized City Representative under them. Retention amounts shall be withheld from progress payments as required by law unless Contractor provides securities in lieu of retention. b. In addition to the scheduled Work to be performed by the Contractor, the parties recognize that additional, unforeseen work and services may be required by the Authorized City Representative. In anticipation of such contingencies, the sum of FORTY-NINE THOUSAND THREE HUNDRED NINE DOLLARS and 00/100 ($49,309.00) has been added to the total compensation of this Contract. The Authorized City Representative may approve the additional work and the actual costs incurred by the Contractor in performance of additional work or services in accordance with such amount as the Authorized City Representative and the Contractor may agree upon in advance. Said additional work or services and the amount of compensation therefor, up to the amount of the authorized contingency, shall be memorialized in the form of a Contract Amendment approved by the City Manager on a form acceptable to the City Attorney. The Contractor agrees to perform only that work or those services that are specifically requested by the Authorized City Representative. Any and all additional work and services performed under this Contract shall be completed in such sequence as to assure their completion as expeditiously as is consistent with professional skill and care in accordance with a cost estimate or proposal submitted to and approved by the Authorized City Representative prior to the commencement of such Work or services.
c. The total amount of compensation under this Contract, including contingencies, shall not exceed THREE HUNDRED SEVENTY-EIGHT THOUSAND THIRTY-NINE DOLLARS and 00/100 ($378,039.00).

ARTICLE 4
Licenses
Contractor represents that it and any subcontractors it may engage, possess any and all licenses which are required under state or federal law to perform the Work contemplated by this Contract and that Contractor and subcontractors shall maintain all appropriate licenses, including a City of Orange business license, at its cost, during the performance of this Contract. 413
4 ARTICLE 5
Guarantees
a. Contractor guarantees the construction and installation of all Work included in the Plans and Specifications for which Contractor has been awarded this Contract. b. Should any of the materials or equipment installed pursuant to this Contract prove defective or should the Work as a whole prove defective, due to faulty equipment, workmanship, materials furnished or methods of installations, or should said Work or any part thereof fail to function properly, as designed, due to any of the above causes within twelve (12) months after the date on which said Work is accepted by City, Contractor shall make repairs and furnish such materials and equipment as are necessary to be furnished and installed within fifteen (15) calendar days after the receipt of a demand from City.
c. Said Work will be deemed defective within the meaning of this guarantee in the event that it fails to function as originally intended either by the Plans and Specifications of this Contract or by the manufacturer(s) of the equipment incorporated into the Work. d. In the event repairs are not made within fifteen (15) calendar days after Contractor's receipt of a demand from City, City shall have the unqualified option to make any needed repairs or replacements itself or by any other contractor. Contractor shall reimburse City, upon demand, for all expenses incurred in restoring said Work to the condition contemplated in this Contract, including the cost of any equipment or materials replaced. e. It is understood that emergency repairs may, by necessity, be made by City.

Therefore, when defective equipment, materials or workmanship result in emergency repairs by City, Contractor shall reimburse City, upon demand, for all expenses incurred. Emergency repairs will be deemed as those repairs determined by City’s Director of Public Works to be necessary due to an immediate detriment to the health, safety, welfare or convenience of the residents of City.

ARTICLE 6
Water Quality
a. The Santa Ana Regional Water Quality Control Board (“RWQCB”) has issued National Pollutant Discharge Elimination System (“NPDES”) Permit No. R8-2009-0030 (the “Permit”), which governs storm water and non-storm water discharges resulting from municipal activities performed by City or its contractors. In order to comply with the Permit requirements, the County of Orange has prepared a Drainage Area Management Plan (“DAMP”), containing Model Maintenance Procedures with Best Management Practices (“BMPs”) that City and its contractors must adhere to. The Model Maintenance Procedures contain pollution prevention and source control techniques to minimize the impact of those activities upon dry-weather urban runoff, storm water runoff, and receiving water quality. Examples include: wash water from cleaning of sidewalks or parking lots must be collected and disposed of in the sewer or landscaped areas.
414
5 b. The Permit, the DAMP and the Model Maintenance Procedures are on file in the office of City’s Director of Public Works. Contractor hereby acknowledges that it has read, reviewed and understands the Permit, the DAMP and the Model Maintenance Procedures, as they relate to the Work and hereby shall perform the Work in conformance therewith.

ARTICLE 7
Independent Contractor; Contractor not Agent
a. At all times during the term of this Contract, Contractor shall be an independent contractor and not an employee of City. City shall have the right to control Contractor only insofar as the result of Contractor’s services rendered pursuant to this Contract. City shall not have the right to control the means by which Contractor accomplishes services rendered pursuant to this Contract. Contractor shall, at its sole cost and expense, furnish all facilities, materials and equipment which may be required for furnishing services pursuant to this Contract. Contractor shall be solely responsible for, and shall indemnify, defend and save City harmless from all matters relating to the payment of its subcontractors, agents and employees, including compliance with social security, withholding and all other wages, salaries, benefits, taxes, exactions, and regulations of any nature whatsoever. Contractor acknowledges that Contractor and any subcontractors, agents or employees employed by Contractor shall not, under any circumstances, be considered employees of City, and that they shall not be entitled to any of the benefits or rights afforded employees of City, including, but not limited to, sick leave, vacation leave, holiday pay, Public Employees Retirement System benefits, or health, life, dental, long-term disability or workers' compensation insurance benefits.
b. Except as City may specify in writing, Contractor shall have no authority, express or implied, to act on behalf of City in any capacity whatsoever as an agent. Contractor shall have no authority, express or implied, to bind City to any obligation whatsoever.

ARTICLE 8
Public Work; Prevailing Wage
a. The Work which is the subject of this Contract is a “public work,” as that term is defined in Section 1720 of the California Labor Code, for which prevailing wages must be paid.

To the extent Contractor’s employees will perform any work that falls within any of the classifications for which the Department of Labor Relations of the State of California promulgates prevailing wage determinations, Contractor hereby agrees that Contractor, and any subcontractor under it, shall pay not less than the specified prevailing rates of wages to all such workers. The general prevailing wage determinations for crafts can be located on the website of the Department of Industrial Relations (www.dir.ca.gov/DLSR). Additionally, to perform work under this Contract, Contractor must meet all State registration requirements and criteria, including project compliance monitoring.
b. Attached hereto as Attachment No. 1 and incorporated herein by this reference is a copy of the provisions of Sections 1725.5, 1771, 1771.1, 1771.4, 1775, 1776, 1777.5, 1813 and 1815 of the California Labor Code. Contractor hereby acknowledges that it has read, reviewed 415
6 and understands those provisions of the Labor Code and shall prosecute and complete the Work under this Contract in strict compliance with all of those terms and provisions. c. Contractor shall secure the payment of compensation to its employees in accordance with the provisions of Section 3700 of the California Labor Code. Accordingly, and as required by Section 1861 of the California Labor Code, Contractor hereby certifies as follows:
“I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract.”
d. Contractor shall indemnify, protect, defend and hold harmless City and its officers, employees, contractors and agents, with counsel reasonably acceptable to City, from and against any and all loss, liability, damage, claim, cost, expense, and/or “increased costs” (including reasonable attorney’s fees, court and litigation costs, and fees of expert witnesses) which result or arise in any way from the noncompliance by Contractor of any applicable local, state and/or federal law, including, without limitation, any applicable federal and/or state labor laws (including, without limitation, the requirement to pay state prevailing wages). It is agreed by the parties that, in connection with the construction of the Work which is the subject of this Contract, Contractor shall bear all risks of payment or non-payment of state prevailing wages. “Increased costs” as used in this paragraph shall have the meaning ascribed to it in Labor Code Section 1781, as the same may be enacted, adopted or amended from time to time. The foregoing indemnity shall survive termination of this Contract.

ARTICLE 9
Equal Employment Opportunity
During the performance of this Contract, Contractor agrees as follows:
a. Contractor shall not discriminate against any employee or applicant for employment because of race, color, religion, sex, national origin, mental or physical disability, or any other basis prohibited by applicable law. Contractor shall ensure that applicants are employed and that employees are treated during employment, without regard to their race, color, religion, sex, national origin, mental or physical disability, or any other basis prohibited by applicable law.

Such actions shall include, but not be limited to the following: employment, upgrading, demotion or transfer, recruitment or recruitment advertising, layoff or termination, rates of pay or other forms of compensation and selection for training, including apprenticeship. Contractor shall post in conspicuous places, available to employees and applicants for employment, a notice setting forth provisions of this non-discrimination clause.
b. Contractor shall, in all solicitations and advertisements for employees placed by, or on behalf of Contractor, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, national origin, mental or physical disability, or any other basis prohibited by applicable law. 416
7 c. Contractor shall cause the foregoing paragraphs (a) and (b) to be inserted in all subcontracts for any Work covered by this Contract, provided that the foregoing provisions shall not apply to subcontracts for standard commercial supplies or raw materials.

ARTICLE 10
Conflicts of Interest
Contractor agrees that it shall not make, participate in the making, or in any way attempt to use its position as a contractor to influence any decision of City in which Contractor knows or has reason to know that Contractor, its officers, partners, or employees have a financial interest as defined in Section 87103 of the Government Code. Contractor further agrees that it shall not be eligible to work as the builder for any project for which the design work is part of this Contract.

ARTICLE 11
Indemnity
Contractor shall defend, indemnify and hold harmless City and its officers, officials, agents, and employees from and against:
a. Any and all claims, liabilities, losses, damages, penalties, costs or expenses (including reasonable attorneys' fees and court costs) which City may directly or indirectly sustain or suffer arising from or as a result of the death of any person or any accident, injury, loss or damage whatsoever caused to any person or the property of any person which shall occur on or adjacent to the real property which is the subject of this Contract, or in connection with performance of this Contract which may be directly or indirectly caused by the acts or omissions of Contractor or its officers, employees, contractors or agents, or as a consequence of any use, generation, manufacture, storage, disposal, release or threatened release of a hazardous waste or substance. Contractor shall not be responsible for (and such indemnity shall not apply to) any willful misconduct, negligence or breach of this Contract by City or its officers, officials, agents, and employees. The foregoing indemnity shall survive termination of this Contract. b. Any and all claims under workers’ compensation acts and other employee benefit acts with respect to Contractor’s employees or its subcontractor’s employees arising out of Contractor’s Work under this Contract, including any and all claims under any law pertaining to Contractor’s status as an independent contractor.

ARTICLE 12
Insurance
a. Contractor shall procure and maintain for the duration of this Contract insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the Work hereunder and the results of that Work by Contractor, its agents, representatives, employees or subcontractors. Any umbrella liability insurance that is provided as part of the general or automobile liability minimums set forth below shall be maintained for the duration of the Contract.
417
8 b. Contractor shall maintain the following minimum amount of insurance: the greater of either the limits set forth in (1) through (4), below; or all of the insurance coverage and/or limits carried by or available to Contractor.
(1) General Liability $2,000,000 per occurrence for bodily injury, personal injury and property damage. If
Commercial General Liability insurance
or other form with a general aggregate
limit is used, either the general aggregate
limit shall apply separately to this
project/location or the general aggregate
limit shall be twice the required
occurrence limit.
(2) Automobile Liability $1,000,000 per accident for bodily injury and property damage.
(3) Workers’ Compensation as required by the State of California. (4) Employer’s Liability $1,000,000 per accident for bodily injury or disease. c. Any insurance proceeds in excess of or broader than the minimum required coverage and/or minimum required limits which are applicable to a given loss shall be available to City. No representation is made that the minimum insurance requirements of this Contract are sufficient to cover the obligations of Contractor under this Contract. d. Any deductibles or self-insured retentions must be declared to and approved by City. At the option of City, either: the insurer shall reduce or eliminate such deductibles or selfinsured retentions with respect to City, its officers, officials, agents and employees; or Contractor shall provide a financial guarantee satisfactory to City guaranteeing payment of losses and related investigations, claim administration, and defense expenses. e. Each policy of general liability and automotive liability insurance shall contain, or be endorsed to contain, the following provisions:
(1) City, its officers, officials, agents, and employees are declared to be additional insureds under the terms of the policy, with respect to liability arising out of automobiles owned, leased, hired or borrowed by or on behalf of Contractor (any auto), and with respect to liability arising out of Work or operations performed by or on behalf of Contractor, including materials, parts or equipment furnished in connection with such Work or operations. A policy endorsement to that effect shall be provided to City along with the certificate of insurance. In lieu of an endorsement, City will accept a copy of the policy(ies) which evidences that City is an additional insured as a contracting party. The minimum coverage required by Subsection 12.b, above, shall apply to City as an additional insured.
418
9 (2) For any claims related to this Contract, Contractor’s insurance coverage shall be primary insurance with respect to City, its officers, officials, agents and employees. Any insurance or self-insurance maintained by City, its officers, officials, agents and employees shall be excess of Contractor’s insurance and shall not contribute with it. (3) Coverage shall not be canceled, except after thirty (30) days’ prior written notice has been provided to City.
f. Contractor shall furnish City with original certificates of insurance and endorsements effecting coverage required by this Article 12. The endorsements shall be on forms acceptable to City. All certificates and endorsements are to be received and approved by City before the Work commences. However, failure to do so shall not operate as a waiver of these insurance requirements. City reserves the right to require complete, certified copies of all required insurance policies, including endorsements effecting the coverage required by these specifications at any time.
g. All insurance procured and maintained by Contractor shall be issued by insurers admitted to conduct the pertinent line of insurance business in California and having a rating of Grade A or better and Class VII or better by the latest edition of Best Key Rating Guide. h. Contractor shall immediately notify City if any required insurance lapses or is otherwise modified and cease performance of this Contract unless otherwise directed by City. In such a case, City may procure insurance or self-insure the risk and charge Contractor for such costs and any and all damages resulting therefrom by way of set-off from any sums owed Contractor. i. Contractor agrees that in the event of loss due to any of the perils for which it has agreed to provide insurance, Contractor shall look solely to its insurance for recovery. Contractor hereby grants to City, on behalf of any insurer providing insurance to either Contractor or City with respect to the services of Contractor herein, a waiver of any right to subrogation which any such insurer may acquire against City by virtue of the payment of any loss under such insurance.

The Workers’ Compensation policy shall be endorsed with a waiver of subrogation in favor of City for all Work performed by Contractor, its employees, agents and subcontractors. Contractor shall obtain any other endorsement that may be necessary to effect this waiver of subrogation. j. Contractor shall require and verify that all subcontractors maintain insurance meeting all of the requirements stated herein.

ARTICLE 13
Termination
City, acting through its City Manager or his/her designee, reserves the right to terminate this Contract for any reason by giving five (5) days’ written notice of intent to terminate to Contractor. Upon receipt of notice, Contractor shall immediately cease work, unless the notice provides otherwise. Should City terminate this Contract, City shall pay Contractor for services satisfactorily provided and all allowable reimbursements incurred to the date of termination in 419
10 compliance with this Contract, unless such termination shall be for cause, in which event City may withhold any disputed compensation. City shall not be liable for any claim of lost profits.

ARTICLE 14
Maintenance and Inspection of Records
In accordance with generally accepted accounting principles, Contractor and its subcontractors shall maintain reasonably full and complete books, documents, papers, accounting records and other information (collectively, the “records”) pertaining to the costs of and completion of services performed under this Contract. During the term of this Contract and for a period of three (3) years after termination or completion of this Contract, City shall have the right to inspect and/or audit Contractor's records pertaining to the performance of this Contract at Contractor's office. Contractor shall make available all such records for inspection or audit at its offices during normal business hours and upon three (3) days’ notice from City, and copies thereof shall be furnished if requested.

ARTICLE 15
Compliance with Laws
a. Contractor shall be knowledgeable of and comply with all local, state and federal laws pertaining to the subject matter hereof or in any way regulating the activities undertaken by Contractor or any subcontractor hereunder.
b. Contractor represents and warrants that it:
(1) Has complied and shall at all times during the term of this Contract comply, in all respects, with all immigration laws, regulations, statutes, rules, codes, and orders, including, without limitation, the Immigration Reform and Control Act of 1986 (IRCA); and (2) Has not and will not knowingly employ any individual to perform services under this Contract who is ineligible to work in the United States or under the terms of this Contract; and (3) Has properly maintained, and shall at all times during the term of this Contract properly maintain, all related employment documentation records including, without limitation, the completion and maintenance of the Form I-9 for each of Contractor’s employees; and (4) Has responded, and shall at all times during the term of this Contract respond, in a timely fashion to any government inspection requests relating to immigration law compliance and/or Form I-9 compliance and/or worksite enforcement by the Department of Homeland Security, the Department of Labor, or the Social Security Administration. c. Contractor shall require all subcontractors and/or subconsultants to make the same representations and warranties required by this Article 15 when hired to perform services under this Contract.
420
11 d. Contractor shall, upon request of City, provide a list of all employees working under this Contract and shall provide, to the reasonable satisfaction of City, verification that all such employees are eligible to work in the United States. All costs associated with such verification shall be borne by Contractor. Once such request has been made, Contractor may not change employees working under this Contract without written notice to City, accompanied by the verification required herein for such employees. Contractor shall require all subcontractors and/or sub-consultants to make the same verification when hired to perform services under this Contract. e. If Contractor, or a subcontractor or subconsultant, knowingly employs an employee providing Work under this Contract who is not authorized to work in the United States, and/or fails to follow federal laws to determine the status of such employee, such shall constitute a material breach of this Contract and may be cause for immediate termination of this Contract by City.
f. Contractor shall indemnify and hold City, its officials and employees harmless for, of and from any loss, including but not limited to fines, penalties and corrective measures, City may sustain by reason of Contractor’s failure to comply with said laws, rules and regulations in connection with the performance of this Contract.

ARTICLE 16
Governing Law and Venue
This Contract shall be construed in accordance with and governed by the laws of the State of California and Contractor shall submit to the jurisdiction of California courts. Venue for any dispute arising under this Contract shall be in Orange County, California.

ARTICLE 17
Integration and Amendment
a. This Contract constitutes the entire agreement of the parties. No other agreement, oral or written, pertaining to the Work to be performed under this Contract shall be of any force or effect unless it is in writing and signed by both parties. Any Work performed which is inconsistent with or in violation of the provisions of this Contract shall not be compensated. b. Amendments to this Contract must be in writing and signed by both parties. The City Manager is authorized to execute amendments to this Contract up to the amounts specified in Chapter 3.08 of the Orange Municipal Code.

ARTICLE 18
Notice
Except as otherwise provided herein, all notices required under this Contract shall be in writing and delivered personally, by e-mail, or by first class mail, postage prepaid, to each party at the address listed below. Either party may change the notice address by notifying the other party in writing. Notices shall be deemed received upon receipt of same or within three (3) days of 421
12 deposit in the U.S. Mail, whichever is earlier. Notices sent by e-mail shall be deemed received on the date of the e-mail transmission.
“CONTRACTOR” “CITY”
Tunnelworks Services, Inc. City of Orange
13502 H-Whittier Blvd., #165 300 E. Chapman Avenue
Whittier, CA 90605 Orange, CA 92866-1591
Attn: William Durate, President Attn: Public Works Director Telephone No.: 562-553-2734 Telephone No.: 714-532-6480 E-Mail: [email protected] E-Mail: [email protected] ARTICLE 19
Claim Resolution
City and Contractor agree that the claim resolution process applicable to any claim by Contractor in connection with the Work provided herein shall be subject to the procedures set forth in California Public Contract Code Section 9204, attached hereto as Attachment No. 2, and incorporated herein by this reference.

ARTICLE 20
Counterparts
This Contract may be executed in one or more counterparts, each of which shall be deemed an original, but all of which together shall constitute one and the same instrument. Signatures transmitted via facsimile and electronic mail shall have the same effect as original signatures. [Remainder of page intentionally left blank; signatures on next page] 422
13 “CITY”

CONTRACT, BONDS AND INSURANCE
APPROVED BY:

Mary E. Binning
Senior Assistant City Attorney
CITY OF ORANGE, a municipal corporation
By:

Mark A. Murphy
Mayor of the City of Orange
ATTEST:

Pamela Coleman, City Clerk
“CONTRACTOR”
TUNNELWORKS SERVICES, INC.,
a California corporation
[Note: Signature of Chairman of the By:

Board, President or Vice President is Printed Name:
required] Title:
[Note: Signature of Secretary, Assistant By:

Secretary, Chief Financial Officer or Printed Name:

Assistant Treasurer is also required] Title:
423
Attachment No. 1

Page 1 of 13 ends

ATTACHMENT NO. 1

CALIFORNIA LABOR CODE
SECTIONS 1725.5, 1771, 1771.1, 1771.4, 1775, 1776, 1777.5, 1813 and 1815 Section 1725.5. Registration of contractors; mandatory registration; qualifications and application; fees; exempt contractors
A contractor shall be registered pursuant to this section to be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any public work contract that is subject to the requirements of this chapter. For the purposes of this section, “contractor” includes a subcontractor as defined by Section 1722.1. (a) To qualify for registration under this section, a contractor shall do all of the following:
(1)(A) Register with the Department of Industrial Relations in the manner prescribed by the department and pay an initial nonrefundable application fee of four hundred dollars ($400) to qualify for registration under this section and an annual renewal fee on or before July 1 of each year thereafter. The annual renewal fee shall be in a uniform amount set by the Director of Industrial Relations, and the initial registration and renewal fees may be adjusted no more than annually by the director to support the costs specified in Section 1771.3. (B) Beginning June 1, 2019, a contractor may register or renew according to this subdivision in annual increments up to three years from the date of registration. Contractors who wish to do so will be required to prepay the applicable nonrefundable application or renewal fees to qualify for the number of years for which they wish to preregister.
(2) Provide evidence, disclosures, or releases as are necessary to establish all of the following:
(A) Workers' compensation coverage that meets the requirements of Division 4 (commencing with Section 3200) and includes sufficient coverage for any worker whom the contractor employs to perform work that is subject to prevailing wage requirements other than a contractor who is separately registered under this section.

Coverage may be evidenced by a current and valid certificate of workers' compensation insurance or certification of self-insurance required under Section 7125 of the Business and Professions Code. (B) If applicable, the contractor is licensed in accordance with Chapter 9 (commencing with Section 7000) of the Business and Professions Code.
(C) The contractor does not have any delinquent liability to an employee or the state for any assessment of back wages or related damages, interest, fines, or penalties pursuant to any final judgment, order, or determination by a court or any federal, state, or local administrative agency, including a confirmed arbitration award. However, for purposes of this paragraph, the contractor shall not be disqualified for any judgment, order, or determination that is under appeal, provided that the contractor has secured the payment of any amount eventually found due through a bond or other appropriate means. (D) The contractor is not currently debarred under Section 1777.1 or under any other federal or state law providing for the debarment of contractors from public works. (E) The contractor has not bid on a public works contract, been listed in a bid proposal, or engaged in the performance of a contract for public works without being lawfully registered in accordance with this section, within the preceding 12 months or since the effective date of the requirements set forth in subdivision (e), whichever is earlier. If a contractor is found to be in violation of the requirements of this paragraph, the period of disqualification shall be waived if both of the following are true:
424
Attachment No. 1

Page 2 of 13 ends

(i) The contractor has not previously been found to be in violation of the requirements of this paragraph within the preceding 12 months.
(ii) The contractor pays an additional nonrefundable penalty registration fee of two thousand dollars ($2,000). (b) Fees received pursuant to this section shall be deposited in the State Public Works Enforcement Fund established by Section 1771.3 and shall be used only for the purposes specified in that section. (c) A contractor who fails to pay the renewal fee required under paragraph (1) of subdivision (a) on or before the expiration of any prior period of registration shall be prohibited from bidding on or engaging in the performance of any contract for public work until once again registered pursuant to this section. If the failure to pay the renewal fee was inadvertent, the contractor may renew its registration retroactively by paying an additional nonrefundable penalty renewal fee equal to the amount of the renewal fee within 90 days of the due date of the renewal fee.
(d) If, after a body awarding a contract accepts the contractor's bid or awards the contract, the work covered by the bid or contract is determined to be a public work to which Section 1771 applies, either as the result of a determination by the director pursuant to Section 1773.5 or a court decision, the requirements of this section shall not apply, subject to the following requirements:
(1) The body that awarded the contract failed, in the bid specification or in the contract documents, to identify as a public work that portion of the work that the determination or decision subsequently classifies as a public work.
(2) Within 20 days following service of notice on the awarding body of a determination by the Director of Industrial Relations pursuant to Section 1773.5 or a decision by a court that the contract was for public work as defined in this chapter, the contractor and any subcontractors are registered under this section or are replaced by a contractor or subcontractors who are registered under this section. (3) The requirements of this section shall apply prospectively only to any subsequent bid, bid proposal, contract, or work performed after the awarding body is served with notice of the determination or decision referred to in paragraph (2).
(e) The requirements of this section shall apply to any bid proposal submitted on or after March 1, 2015, to any contract for public work, as defined in this chapter, executed on or after April 1, 2015, and to any work performed under a contract for public work on or after January 1, 2018, regardless of when the contract for public work was executed.
(f) This section does not apply to work performed on a public works project of twenty-five thousand dollars ($25,000) or less when the project is for construction, alteration, demolition, installation, or repair work or to work performed on a public works project of fifteen thousand dollars ($15,000) or less when the project is for maintenance work.

Section 1771. Payment of general prevailing rate
Except for public works projects of one thousand dollars ($1,000) or less, not less than the general prevailing rate of per diem wages for work of a similar character in the locality in which the public work is performed, and not less than the general prevailing rate of per diem wages for holiday and overtime work fixed as provided in this chapter, shall be paid to all workers employed on public works.

This section is applicable only to work performed under contract, and is not applicable to work carried out by a public agency with its own forces. This section is applicable to contracts let for maintenance work. 425
Attachment No. 1

Page 3 of 13 ends

Section 1771.1. Registration as a contractor or subcontractor required prior to bid submission; exceptions; violations; penalties
(a) A contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5. It is not a violation of this section for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded.
(b) Notice of the requirement described in subdivision (a) shall be included in all bid invitations and public works contracts, and a bid shall not be accepted nor any contract or subcontract entered into without proof of the contractor or subcontractor's current registration to perform public work pursuant to Section 1725.5. (c) An inadvertent error in listing a subcontractor who is not registered pursuant to Section 1725.5 in a bid proposal shall not be grounds for filing a bid protest or grounds for considering the bid nonresponsive, provided that any of the following apply:
(1) The subcontractor is registered prior to the bid opening. (2) Within 24 hours after the bid opening, the subcontractor is registered and has paid the penalty registration fee specified in subparagraph (E) of paragraph (2) of subdivision (a) of Section 1725.5. (3) The subcontractor is replaced by another registered subcontractor pursuant to Section 4107 of the Public Contract Code.
(d) Failure by a subcontractor to be registered to perform public work as required by subdivision (a) shall be grounds under Section 4107 of the Public Contract Code for the contractor, with the consent of the awarding authority, to substitute a subcontractor who is registered to perform public work pursuant to Section 1725.5 in place of the unregistered subcontractor.
(e) The department shall maintain on its Internet Web site a list of contractors who are currently registered to perform public work pursuant to Section 1725.5.
(f) A contract entered into with any contractor or subcontractor in violation of subdivision (a) shall be subject to cancellation, provided that a contract for public work shall not be unlawful, void, or voidable solely due to the failure of the awarding body, contractor, or any subcontractor to comply with the requirements of Section 1725.5 or this section.
(g) If the Labor Commissioner or his or her designee determines that a contractor or subcontractor engaged in the performance of any public work contract without having been registered in accordance with this section, the contractor or subcontractor shall forfeit, as a civil penalty to the state, one hundred dollars ($100) for each day of work performed in violation of the registration requirement, not to exceed an aggregate penalty of eight thousand dollars ($8,000) in addition to any penalty registration fee assessed pursuant to clause (ii) of subparagraph (E) of paragraph (2) of subdivision (a) of Section 1725.5. (h)(1) In addition to, or in lieu of, any other penalty or sanction authorized pursuant to this chapter, a higher tiered public works contractor or subcontractor who is found to have entered into a subcontract with an unregistered lower tier subcontractor to perform any public work in violation of the requirements of Section 1725.5 or this section shall be subject to forfeiture, as a civil penalty to the state, of one hundred dollars ($100) 426
Attachment No. 1

Page 4 of 13 ends

for each day the unregistered lower tier subcontractor performs work in violation of the registration requirement, not to exceed an aggregate penalty of ten thousand dollars ($10,000). (2) The Labor Commissioner shall use the same standards specified in subparagraph (A) of paragraph (2) of subdivision (a) of Section 1775 when determining the severity of the violation and what penalty to assess, and may waive the penalty for a first time violation that was unintentional and did not hinder the Labor Commissioner's ability to monitor and enforce compliance with the requirements of this chapter. (3) A higher tiered public works contractor or subcontractor shall not be liable for penalties assessed pursuant to paragraph (1) if the lower tier subcontractor's performance is in violation of the requirements of Section 1725.5 due to the revocation of a previously approved registration. (4) A subcontractor shall not be liable for any penalties assessed against a higher tiered public works contractor or subcontractor pursuant to paragraph (1). A higher tiered public works contractor or subcontractor may not require a lower tiered subcontractor to indemnify or otherwise be liable for any penalties pursuant to paragraph (1).
(i) The Labor Commissioner or his or her designee shall issue a civil wage and penalty assessment, in accordance with the provisions of Section 1741, upon determination of penalties pursuant to subdivision (g) and subparagraph (B) of paragraph (1) of subdivision (h). Review of a civil wage and penalty assessment issued under this subdivision may be requested in accordance with the provisions of Section 1742. The regulations of the Director of Industrial Relations, which govern proceedings for review of civil wage and penalty assessments and the withholding of contract payments under Article 1 (commencing with Section 1720) and Article 2 (commencing with Section 1770), shall apply. (j)(1) Where a contractor or subcontractor engages in the performance of any public work contract without having been registered in violation of the requirements of Section 1725.5 or this section, the Labor Commissioner shall issue and serve a stop order prohibiting the use of the unregistered contractor or the unregistered subcontractor on all public works until the unregistered contractor or unregistered subcontractor is registered. The stop order shall not apply to work by registered contractors or subcontractors on the public work.
(2) A stop order may be personally served upon the contractor or subcontractor by either of the following methods:
(A) Manual delivery of the order to the contractor or subcontractor personally. (B) Leaving signed copies of the order with the person who is apparently in charge at the site of the public work and by thereafter mailing copies of the order by first class mail, postage prepaid to the contractor or subcontractor at one of the following:
(i) The address of the contractor or subcontractor on file with either the Secretary of State or the Contractors' State License Board.
(ii) If the contractor or subcontractor has no address on file with the Secretary of State or the Contractors' State License Board, the address of the site of the public work. (3) The stop order shall be effective immediately upon service and shall be subject to appeal by the party contracting with the unregistered contractor or subcontractor, by the unregistered contractor or subcontractor, or both. The appeal, hearing, and any further review of the hearing decision shall be governed by the procedures, time limits, and other requirements specified in subdivision (a) of Section 238.1. 427
Attachment No. 1

Page 5 of 13 ends

(4) Any employee of an unregistered contractor or subcontractor who is affected by a work stoppage ordered by the commissioner pursuant to this subdivision shall be paid at his or her regular hourly prevailing wage rate by that employer for any hours the employee would have worked but for the work stoppage, not to exceed 10 days.
(k) Failure of a contractor or subcontractor, owner, director, officer, or managing agent of the contractor or subcontractor to observe a stop order issued and served upon him or her pursuant to subdivision (j) is guilty of a misdemeanor punishable by imprisonment in county jail not exceeding 60 days or by a fine not exceeding ten thousand dollars ($10,000), or both.
(l) This section shall apply to any bid proposal submitted on or after March 1, 2015, and any contract for public work entered into on or after April 1, 2015. This section shall also apply to the performance of any public work, as defined in this chapter, on or after January 1, 2018, regardless of when the contract for public work was entered.
(m) Penalties received pursuant to this section shall be deposited in the State Public Works Enforcement Fund established by Section 1771.3 and shall be used only for the purposes specified in that section. (n) This section shall not apply to work performed on a public works project of twenty-five thousand dollars ($25,000) or less when the project is for construction, alteration, demolition, installation, or repair work or to work performed on a public works project of fifteen thousand dollars ($15,000) or less when the project is for maintenance work.

Section 1771.4. Additional requirements when bidding and awarding public works contracts (a) All of the following are applicable to all public works projects that are otherwise subject to the requirements of this chapter:
(1) The call for bids and contract documents shall specify that the project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. (2) The awarding body shall post or require the prime contractor to post job site notices, as prescribed by regulation.
(3) Each contractor and subcontractor shall furnish the records specified in Section 1776 directly to the Labor Commissioner, in the following manner:
(A) At least monthly or more frequently if specified in the contract with the awarding body. (B) In a format prescribed by the Labor Commissioner.
(4) If the contractor or subcontractor is not registered pursuant to Section 1725.5 and is performing work on a project for which registration is not required because of subdivision (f) of Section 1725.5, the unregistered contractor or subcontractor is not required to furnish the records specified in Section 1776 directly to the Labor Commissioner but shall retain the records specified in Section 1776for at least three years after completion of the work.
(5) The department shall undertake those activities it deems necessary to monitor and enforce compliance with prevailing wage requirements.
428
Attachment No. 1

Page 6 of 13 ends

(b) The Labor Commissioner may exempt a public works project from compliance with all or part of the requirements of subdivision (a) if either of the following occurs:
(1) The awarding body has enforced an approved labor compliance program, as defined in Section 1771.5, on all public works projects under its authority, except those deemed exempt pursuant to subdivision (a) of Section 1771.5, continuously since December 31, 2011.
(2) The awarding body has entered into a collective bargaining agreement that binds all contractors performing work on the project and that includes a mechanism for resolving disputes about the payment of wages. (c) The requirements of paragraph (1) of subdivision (a) shall only apply to contracts for public works projects awarded on or after January 1, 2015.
(d) The requirements of paragraph (3) of subdivision (a) shall apply to all contracts for public work, whether new or ongoing, on or after January 1, 2016.

Section 1775. Penalties for violations
(a)(1) The contractor and any subcontractor under the contractor shall, as a penalty to the state or political subdivision on whose behalf the contract is made or awarded, forfeit not more than two hundred dollars ($200) for each calendar day, or portion thereof, for each worker paid less than the prevailing wage rates as determined by the director for the work or craft in which the worker is employed for any public work done under the contract by the contractor or, except as provided in subdivision (b), by any subcontractor under the contractor.
(2)(A) The amount of the penalty shall be determined by the Labor Commissioner based on consideration of both of the following:
(i) Whether the failure of the contractor or subcontractor to pay the correct rate of per diem wages was a good faith mistake and, if so, the error was promptly and voluntarily corrected when brought to the attention of the contractor or subcontractor.
(ii) Whether the contractor or subcontractor has a prior record of failing to meet its prevailing wage obligations.
(B)(i) The penalty may not be less than forty dollars ($40) for each calendar day, or portion thereof, for each worker paid less than the prevailing wage rate, unless the failure of the contractor or subcontractor to pay the correct rate of per diem wages was a good faith mistake and, if so, the error was promptly and voluntarily corrected when brought to the attention of the contractor or subcontractor. (ii) The penalty may not be less than eighty dollars ($80) for each calendar day, or portion thereof, for each worker paid less than the prevailing wage rate, if the contractor or subcontractor has been assessed penalties within the previous three years for failing to meet its prevailing wage obligations on a separate contract, unless those penalties were subsequently withdrawn or overturned. (iii) The penalty may not be less than one hundred twenty dollars ($120) for each calendar day, or portion thereof, for each worker paid less than the prevailing wage rate, if the Labor Commissioner determines that the violation was willful, as defined in subdivision (c) of Section 1777.1. (C) If the amount due under this section is collected from the contractor or subcontractor, any outstanding wage claim under Chapter 1 (commencing with Section 1720) of Part 7 of Division 2 against that contractor 429
Attachment No. 1

Page 7 of 13 ends

or subcontractor shall be satisfied before applying that amount to the penalty imposed on that contractor or subcontractor pursuant to this section.
(D) The determination of the Labor Commissioner as to the amount of the penalty shall be reviewable only for abuse of discretion.
(E) The difference between the prevailing wage rates and the amount paid to each worker for each calendar day or portion thereof for which each worker was paid less than the prevailing wage rate shall be paid to each worker by the contractor or subcontractor, and the body awarding the contract shall cause to be inserted in the contract a stipulation that this section will be complied with. (b) If a worker employed by a subcontractor on a public works project is not paid the general prevailing rate of per diem wages by the subcontractor, the prime contractor of the project is not liable for any penalties under subdivision (a) unless the prime contractor had knowledge of that failure of the subcontractor to pay the specified prevailing rate of wages to those workers or unless the prime contractor fails to comply with all of the following requirements:
(1) The contract executed between the contractor and the subcontractor for the performance of work on the public works project shall include a copy of the provisions of this section and Sections 1771, 1776, 1777.5, 1813, and 1815.
(2) The contractor shall monitor the payment of the specified general prevailing rate of per diem wages by the subcontractor to the employees, by periodic review of the certified payroll records of the subcontractor. (3) Upon becoming aware of the failure of the subcontractor to pay his or her workers the specified prevailing rate of wages, the contractor shall diligently take corrective action to halt or rectify the failure, including, but not limited to, retaining sufficient funds due the subcontractor for work performed on the public works project. (4) Prior to making final payment to the subcontractor for work performed on the public works project, the contractor shall obtain an affidavit signed under penalty of perjury from the subcontractor that the subcontractor has paid the specified general prevailing rate of per diem wages to his or her employees on the public works project and any amounts due pursuant to Section 1813. (c) The Division of Labor Standards Enforcement shall notify the contractor on a public works project within 15 days of the receipt by the Division of Labor Standards Enforcement of a complaint of the failure of a subcontractor on that public works project to pay workers the general prevailing rate of per diem wages.

Section 1776. Payroll records; retention; inspection; redacted information; agencies entitled to receive nonredacted copies of certified records; noncompliance penalties; rules (a) Each contractor and subcontractor shall keep accurate payroll records, showing the name, address, social security number, work classification, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed by him or her in connection with the public work. Each payroll record shall contain or be verified by a written declaration that it is made under penalty of perjury, stating both of the following:
(1) The information contained in the payroll record is true and correct. (2) The employer has complied with the requirements of Sections 1771, 1811, and 1815 for any work performed by his or her employees on the public works project. 430
Attachment No. 1

Page 8 of 13 ends

(b) The payroll records enumerated under subdivision (a) shall be certified and shall be available for inspection at all reasonable hours at the principal office of the contractor on the following basis:
(1) A certified copy of an employee's payroll record shall be made available for inspection or furnished to the employee or his or her authorized representative on request. (2) A certified copy of all payroll records enumerated in subdivision (a) shall be made available for inspection or furnished upon request to a representative of the body awarding the contract and the Division of Labor Standards Enforcement of the Department of Industrial Relations. (3) A certified copy of all payroll records enumerated in subdivision (a) shall be made available upon request by the public for inspection or for copies thereof. However, a request by the public shall be made through either the body awarding the contract or the Division of Labor Standards Enforcement. If the requested payroll records have not been provided pursuant to paragraph (2), the requesting party shall, prior to being provided the records, reimburse the costs of preparation by the contractor, subcontractors, and the entity through which the request was made. The public may not be given access to the records at the principal office of the contractor.
(c) Unless required to be furnished directly to the Labor Commissioner in accordance with paragraph (3) of subdivision (a) of Section 1771.4, the certified payroll records shall be on forms provided by the Division of Labor Standards Enforcement or shall contain the same information as the forms provided by the division.

The payroll records may consist of printouts of payroll data that are maintained as computer records, if the printouts contain the same information as the forms provided by the division and the printouts are verified in the manner specified in subdivision (a).
(d) A contractor or subcontractor shall file a certified copy of the records enumerated in subdivision (a) with the entity that requested the records within 10 days after receipt of a written request. (e) Except as provided in subdivision (f), any copy of records made available for inspection as copies and furnished upon request to the public or any public agency by the awarding body or the Division of Labor Standards Enforcement shall be marked or obliterated to prevent disclosure of an individual's name, address, and social security number. The name and address of the contractor awarded the contract or the subcontractor performing the contract shall not be marked or obliterated. Any copy of records made available for inspection by, or furnished to, a multiemployer Taft-Hartley trust fund (29 U.S.C. Sec. 186(c)(5)) that requests the records for the purposes of allocating contributions to participants shall be marked or obliterated only to prevent disclosure of an individual's full social security number, but shall provide the last four digits of the social security number. Any copy of records made available for inspection by, or furnished to, a joint labormanagement committee established pursuant to the federal Labor Management Cooperation Act of 1978 (29 U.S.C. Sec. 175a) shall be marked or obliterated only to prevent disclosure of an individual's social security number.
(f)(1) Notwithstanding any other provision of law, agencies that are included in the Joint Enforcement Strike Force on the Underground Economy established pursuant to Section 329 of the Unemployment Insurance Code and other law enforcement agencies investigating violations of law shall, upon request, be provided nonredacted copies of certified payroll records. Any copies of records or certified payroll made available for inspection and furnished upon request to the public by an agency included in the Joint Enforcement Strike Force on the Underground Economy or to a law enforcement agency investigating a violation of law shall be marked or redacted to prevent disclosure of an individual's name, address, and social security number. 431
Attachment No. 1

Page 9 of 13 ends

(2) An employer shall not be liable for damages in a civil action for any reasonable act or omission taken in good faith in compliance with this subdivision.
(g) The contractor shall inform the body awarding the contract of the location of the records enumerated under subdivision (a), including the street address, city, and county, and shall, within five working days, provide a notice of a change of location and address.
(h) The contractor or subcontractor has 10 days in which to comply subsequent to receipt of a written notice requesting the records enumerated in subdivision (a). In the event that the contractor or subcontractor fails to comply within the 10-day period, he or she shall, as a penalty to the state or political subdivision on whose behalf the contract is made or awarded, forfeit one hundred dollars ($100) for each calendar day, or portion thereof, for each worker, until strict compliance is effectuated. Upon the request of the Division of Labor Standards Enforcement, these penalties shall be withheld from progress payments then due. A contractor is not subject to a penalty assessment pursuant to this section due to the failure of a subcontractor to comply with this section.
(i) The body awarding the contract shall cause to be inserted in the contract stipulations to effectuate this section.
(j) The director shall adopt rules consistent with the California Public Records Act (Chapter 3.5 (commencing with Section 6250) of Division 7 of Title 1 of the Government Code) and the Information Practices Act of 1977 (Title 1.8 (commencing with Section 1798) of Part 4 of Division 3 of the Civil Code) governing the release of these records, including the establishment of reasonable fees to be charged for reproducing copies of records required by this section.

Section 1777.5. Employment of registered apprentices; wages; standards; number; apprenticeable craft or trade; exemptions; contributions; compliance program (a)(1) This chapter does not prevent the employment upon public works of properly registered apprentices who are active participants in an approved apprenticeship program. (2) For purposes of this chapter, “apprenticeship program” means a program under the jurisdiction of the California Apprenticeship Council established pursuant to Section 3070. (b)(1) Every apprentice employed upon public works shall be paid the prevailing rate of per diem wages for apprentices in the trade to which he or she is registered and shall be employed only at the work of the craft or trade to which he or she is registered.
(2) Unless otherwise provided by a collective bargaining agreement, when a contractor requests the dispatch of an apprentice pursuant to this section to perform work on a public works project and requires the apprentice to fill out an application or undergo testing, training, an examination, or other preemployment process as a condition of employment, the apprentice shall be paid for the time spent on the required preemployment activity, including travel time to and from the required activity, if any, at the prevailing rate of per diem wages for apprentices in the trade to which he or she is registered. Unless otherwise provided by a collective bargaining agreement, a contractor is not required to compensate an apprentice for the time spent on preemployment activities if the apprentice is required to take a preemployment drug or alcohol test and he or she fails to pass that test.
(c) Only apprentices, as defined in Section 3077, who are in training under apprenticeship standards that have been approved by the Chief of the Division of Apprenticeship Standards and who are parties to written 432
Attachment No. 1

Page 10 of 13 ends

apprentice agreements under Chapter 4 (commencing with Section 3070) of Division 3 are eligible to be employed at the apprentice wage rate on public works. The employment and training of each apprentice shall be in accordance with either of the following:
(1) The apprenticeship standards and apprentice agreements under which he or she is training. (2) The rules and regulations of the California Apprenticeship Council. (d) If the contractor to whom the contract is awarded by the state or any political subdivision, in performing any of the work under the contract, employs workers in any apprenticeable craft or trade, the contractor shall employ apprentices in at least the ratio set forth in this section and may apply to any apprenticeship program in the craft or trade that can provide apprentices to the site of the public work for a certificate approving the contractor under the apprenticeship standards for the employment and training of apprentices in the area or industry affected. However, the decision of the apprenticeship program to approve or deny a certificate shall be subject to review by the Administrator of Apprenticeship. The apprenticeship program or programs, upon approving the contractor, shall arrange for the dispatch of apprentices to the contractor. A contractor covered by an apprenticeship program's standards shall not be required to submit any additional application in order to include additional public works contracts under that program. “Apprenticeable craft or trade,” as used in this section, means a craft or trade determined as an apprenticeable occupation in accordance with rules and regulations prescribed by the California Apprenticeship Council. As used in this section, “contractor” includes any subcontractor under a contractor who performs any public works not excluded by subdivision (o).
(e) Before commencing work on a contract for public works, every contractor shall submit contract award information to an applicable apprenticeship program that can supply apprentices to the site of the public work.

The information submitted shall include an estimate of journeyman hours to be performed under the contract, the number of apprentices proposed to be employed, and the approximate dates the apprentices would be employed. A copy of this information shall also be submitted to the awarding body, if requested by the awarding body. Within 60 days after concluding work on the contract, each contractor and subcontractor shall submit to the awarding body, if requested, and to the apprenticeship program a verified statement of the journeyman and apprentice hours performed on the contract. The information under this subdivision shall be public. The apprenticeship programs shall retain this information for 12 months. (f) The apprenticeship program supplying apprentices to the area of the site of the public work shall ensure equal employment and affirmative action in apprenticeship for women and minorities. (g) The ratio of work performed by apprentices to journeymen employed in a particular craft or trade on the public work may be no higher than the ratio stipulated in the apprenticeship standards under which the apprenticeship program operates if the contractor agrees to be bound by those standards. However, except as otherwise provided in this section, in no case shall the ratio be less than one hour of apprentice work for every five hours of journeyman work.
(h) This ratio of apprentice work to journeyman work shall apply during any day or portion of a day when any journeyman is employed at the jobsite and shall be computed on the basis of the hours worked during the day by journeymen so employed. Any work performed by a journeyman in excess of eight hours per day or 40 hours per week shall not be used to calculate the ratio. The contractor shall employ apprentices for the number of hours computed as above before the end of the contract or, in the case of a subcontractor, before the end of the subcontract. However, the contractor shall endeavor, to the greatest extent possible, to employ apprentices during the same time period that the journeymen in the same craft or trade are employed at the jobsite. When an hourly apprenticeship ratio is not feasible for a particular craft or trade, the Administrator 433
Attachment No. 1

Page 11 of 13 ends

of Apprenticeship, upon application of an apprenticeship program, may order a minimum ratio of not less than one apprentice for each five journeymen in a craft or trade classification. (i) A contractor covered by this section who has agreed to be covered by an apprenticeship program's standards upon the issuance of the approval certificate, or who has been previously approved for an apprenticeship program in the craft or trade, shall employ the number of apprentices or the ratio of apprentices to journeymen stipulated in the applicable apprenticeship standards, but in no event less than the 1-to-5 ratio required by subdivision (g).
(j) Upon proper showing by a contractor that he or she employs apprentices in a particular craft or trade in the state on all of his or her contracts on an annual average of not less than one hour of apprentice work for every five hours of labor performed by journeymen, the Administrator of Apprenticeship may grant a certificate exempting the contractor from the 1-to-5 hourly ratio, as set forth in this section for that craft or trade. (k) An apprenticeship program has the discretion to grant to a participating contractor or contractor association a certificate, which shall be subject to the approval of the Administrator of Apprenticeship, exempting the contractor from the 1-to-5 ratio set forth in this section when it finds that any one of the following conditions is met:
(1) Unemployment for the previous three-month period in the area exceeds an average of 15 percent. (2) The number of apprentices in training in the area exceeds a ratio of 1 to 5. (3) There is a showing that the apprenticeable craft or trade is replacing at least one-thirtieth of its journeymen annually through apprenticeship training, either on a statewide basis or on a local basis. (4) Assignment of an apprentice to any work performed under a public works contract would create a condition that would jeopardize his or her life or the life, safety, or property of fellow employees or the public at large, or the specific task to which the apprentice is to be assigned is of a nature that training cannot be provided by a journeyman.
(l) If an exemption is granted pursuant to subdivision (k) to an organization that represents contractors in a specific trade from the 1-to-5 ratio on a local or statewide basis, the member contractors shall not be required to submit individual applications for approval to local joint apprenticeship committees, if they are already covered by the local apprenticeship standards.
(m)(1) A contractor to whom a contract is awarded, who, in performing any of the work under the contract, employs journeymen or apprentices in any apprenticeable craft or trade shall contribute to the California Apprenticeship Council the same amount that the director determines is the prevailing amount of apprenticeship training contributions in the area of the public works site. A contractor may take as a credit for payments to the council any amounts paid by the contractor to an approved apprenticeship program that can supply apprentices to the site of the public works project. The contractor may add the amount of the contributions in computing his or her bid for the contract. (2)(A) At the conclusion of the 2002-03 fiscal year and each fiscal year thereafter, the California Apprenticeship Council shall distribute training contributions received by the council under this subdivision, less the expenses of the Department of Industrial Relations for administering this subdivision, by making grants to approved apprenticeship programs for the purpose of training apprentices. The grant funds shall be distributed as follows:
434
Attachment No. 1

Page 12 of 13 ends

(i) If there is an approved multiemployer apprenticeship program serving the same craft or trade and geographic area for which the training contributions were made to the council, a grant to that program shall be made.
(ii) If there are two or more approved multiemployer apprenticeship programs serving the same craft or trade and county for which the training contributions were made to the council, the grant shall be divided among those programs based on the number of apprentices from that county registered in each program. (iii) All training contributions not distributed under clauses (i) and (ii) shall be used to defray the future expenses of the Department of Industrial Relations for the administration and enforcement of apprenticeship and preapprenticeship standards and requirements under this code. (B) An apprenticeship program shall only be eligible to receive grant funds pursuant to this subdivision if the apprenticeship program agrees, prior to the receipt of any grant funds, to keep adequate records that document the expenditure of grant funds and to make all records available to the Department of Industrial Relations so that the Department of Industrial Relations is able to verify that grant funds were used solely for training apprentices. For purposes of this subparagraph, adequate records include, but are not limited to, invoices, receipts, and canceled checks that account for the expenditure of grant funds. This subparagraph shall not be deemed to require an apprenticeship program to provide the Department of Industrial Relations with more documentation than is necessary to verify the appropriate expenditure of grant funds made pursuant to this subdivision.
(C) The Department of Industrial Relations shall verify that grants made pursuant to this subdivision are used solely to fund training apprentices. If an apprenticeship program is unable to demonstrate how grant funds are expended or if an apprenticeship program is found to be using grant funds for purposes other than training apprentices, then the apprenticeship program shall not be eligible to receive any future grant pursuant to this subdivision and the Department of Industrial Relations may initiate the process to rescind the registration of the apprenticeship program.
(3) All training contributions received pursuant to this subdivision shall be deposited in the Apprenticeship Training Contribution Fund, which is hereby created in the State Treasury. Upon appropriation by the Legislature, all moneys in the Apprenticeship Training Contribution Fund shall be used for the purpose of carrying out this subdivision and to pay the expenses of the Department of Industrial Relations. (n) The body awarding the contract shall cause to be inserted in the contract stipulations to effectuate this section. The stipulations shall fix the responsibility of compliance with this section for all apprenticeable occupations with the prime contractor.
(o) This section does not apply to contracts of general contractors or to contracts of specialty contractors not bidding for work through a general or prime contractor when the contracts of general contractors or those specialty contractors involve less than thirty thousand dollars ($30,000). (p) An awarding body that implements an approved labor compliance program in accordance with subdivision (b) of Section 1771.5 may, with the approval of the director, assist in the enforcement of this section under the terms and conditions prescribed by the director.

Section 1813. Forfeiture for violations; contract stipulation; report of violations The contractor or subcontractor shall, as a penalty to the state or political subdivision on whose behalf the contract is made or awarded, forfeit twenty- five dollars ($25) for each worker employed in the execution of 435
Attachment No. 1

Page 13 of 13 ends

the contract by the respective contractor or subcontractor for each calendar day during which the worker is required or permitted to work more than 8 hours in any one calendar day and 40 hours in any one calendar week in violation of the provisions of this article. In awarding any contract for public work, the awarding body shall cause to be inserted in the contract a stipulation to this effect. The awarding body shall take cognizance of all violations of this article committed in the course of the execution of the contract, and shall report them to the Division of Labor Standards Enforcement.

Section 1815. Overtime
Notwithstanding the provisions of Sections 1810 to 1814, inclusive, of this code, and notwithstanding any stipulation inserted in any contract pursuant to the requirements of said sections, work performed by employees of contractors in excess of 8 hours per day, and 40 hours during any one week, shall be permitted upon public work upon compensation for all hours worked in excess of 8 hours per day at not less than 1 ½ times the basic rate of pay.
436
Attachment No. 2

Page 1 of 3 ends

ATTACHMENT NO. 2
CALIFORNIA PUBLIC CONTRACT CODE SECTION 9204
Section 9204. Legislative findings and declarations regarding timely and complete payment of contractors for public works projects; claims process (Eff: January 1, 2017) (a) The Legislature finds and declares that it is in the best interests of the state and its citizens to ensure that all construction business performed on a public works project in the state that is complete and not in dispute is paid in full and in a timely manner.
(b) Notwithstanding any other law, including, but not limited to, Article 7.1 (commencing with Section 10240) of Chapter 1 of Part 2, Chapter 10 (commencing with Section 19100) of Part 2, and Article 1.5 (commencing with Section 20104) of Chapter 1 of Part 3, this section shall apply to any claim by a contractor in connection with a public works project.
(c) For purposes of this section:
(1) “Claim” means a separate demand by a contractor sent by registered mail or certified mail with return receipt requested, for one or more of the following:
(A) A time extension, including, without limitation, for relief from damages or penalties for delay assessed by a public entity under a contract for a public works project. (B) Payment by the public entity of money or damages arising from work done by, or on behalf of, the contractor pursuant to the contract for a public works project and payment for which is not otherwise expressly provided or to which the claimant is not otherwise entitled. (C) Payment of an amount that is disputed by the public entity. (2) “Contractor” means any type of contractor within the meaning of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code who has entered into a direct contract with a public entity for a public works project.
(3)(A) “Public entity” means, without limitation, except as provided in subparagraph (B), a state agency, department, office, division, bureau, board, or commission, the California State University, the University of California, a city, including a charter city, county, including a charter county, city and county, including a charter city and county, district, special district, public authority, political subdivision, public corporation, or nonprofit transit corporation wholly owned by a public agency and formed to carry out the purposes of the public agency.
(B) “Public entity” shall not include the following:
(i) The Department of Water Resources as to any project under the jurisdiction of that department. (ii) The Department of Transportation as to any project under the jurisdiction of that department. (iii) The Department of Parks and Recreation as to any project under the jurisdiction of that department. (iv) The Department of Corrections and Rehabilitation with respect to any project under its jurisdiction pursuant to Chapter 11 (commencing with Section 7000) of Title 7 of Part 3 of the Penal Code. 437
Attachment No. 2

Page 2 of 3 ends

(v) The Military Department as to any project under the jurisdiction of that department. (vi) The Department of General Services as to all other projects. (vii) The High-Speed Rail Authority.
(4) “Public works project” means the erection, construction, alteration, repair, or improvement of any public structure, building, road, or other public improvement of any kind. (5) “Subcontractor” means any type of contractor within the meaning of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code who either is in direct contract with a contractor or is a lower tier subcontractor.
(d)(1)(A) Upon receipt of a claim pursuant to this section, the public entity to which the claim applies shall conduct a reasonable review of the claim and, within a period not to exceed 45 days, shall provide the claimant a written statement identifying what portion of the claim is disputed and what portion is undisputed. Upon receipt of a claim, a public entity and a contractor may, by mutual agreement, extend the time period provided in this subdivision.
(B) The claimant shall furnish reasonable documentation to support the claim. (C) If the public entity needs approval from its governing body to provide the claimant a written statement identifying the disputed portion and the undisputed portion of the claim, and the governing body does not meet within the 45 days or within the mutually agreed to extension of time following receipt of a claim sent by registered mail or certified mail, return receipt requested, the public entity shall have up to three days following the next duly publicly noticed meeting of the governing body after the 45-day period, or extension, expires to provide the claimant a written statement identifying the disputed portion and the undisputed portion. (D) Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. If the public entity fails to issue a written statement, paragraph (3) shall apply.
(2)(A) If the claimant disputes the public entity’s written response, or if the public entity fails to respond to a claim issued pursuant to this section within the time prescribed, the claimant may demand in writing an informal conference to meet and confer for settlement of the issues in dispute. Upon receipt of a demand in writing sent by registered mail or certified mail, return receipt requested, the public entity shall schedule a meet and confer conference within 30 days for settlement of the dispute. (B) Within 10 business days following the conclusion of the meet and confer conference, if the claim or any portion of the claim remains in dispute, the public entity shall provide the claimant a written statement identifying the portion of the claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. Any disputed portion of the claim, as identified by the contractor in writing, shall be submitted to nonbinding mediation, with the public entity and the claimant sharing the associated costs equally. The public entity and claimant shall mutually agree to a mediator within 10 business days after the disputed portion of the claim has been identified in writing. If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the claim. Each party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator. If mediation is unsuccessful, the parts of the claim remaining in dispute shall be subject to applicable procedures outside this section. 438
Attachment No. 2

Page 3 of 3 ends

(C) For purposes of this section, mediation includes any nonbinding process, including, but not limited to, neutral evaluation or a dispute review board, in which an independent third party or board assists the parties in dispute resolution through negotiation or by issuance of an evaluation. Any mediation utilized shall conform to the timeframes in this section.
(D) Unless otherwise agreed to by the public entity and the contractor in writing, the mediation conducted pursuant to this section shall excuse any further obligation under Section 20104.4 to mediate after litigation has been commenced.
(E) This section does not preclude a public entity from requiring arbitration of disputes under private arbitration or the Public Works Contract Arbitration Program, if mediation under this section does not resolve the parties’ dispute.
(3) Failure by the public entity to respond to a claim from a contractor within the time periods described in this subdivision or to otherwise meet the time requirements of this section shall result in the claim being deemed rejected in its entirety. A claim that is denied by reason of the public entity’s failure to have responded to a claim, or its failure to otherwise meet the time requirements of this section, shall not constitute an adverse finding with regard to the merits of the claim or the responsibility or qualifications of the claimant. (4) Amounts not paid in a timely manner as required by this section shall bear interest at 7 percent per annum. (5) If a subcontractor or a lower tier subcontractor lacks legal standing to assert a claim against a public entity because privity of contract does not exist, the contractor may present to the public entity a claim on behalf of a subcontractor or lower tier subcontractor. A subcontractor may request in writing, either on their own behalf or on behalf of a lower tier subcontractor, that the contractor present a claim for work which was performed by the subcontractor or by a lower tier subcontractor on behalf of the subcontractor. The subcontractor requesting that the claim be presented to the public entity shall furnish reasonable documentation to support the claim. Within 45 days of receipt of this written request, the contractor shall notify the subcontractor in writing as to whether the contractor presented the claim to the public entity and, if the original contractor did not present the claim, provide the subcontractor with a statement of the reasons for not having done so. (e) The text of this section or a summary of it shall be set forth in the plans or specifications for any public works project that may give rise to a claim under this section. (f) A waiver of the rights granted by this section is void and contrary to public policy, provided, however, that (1) upon receipt of a claim, the parties may mutually agree to waive, in writing, mediation and proceed directly to the commencement of a civil action or binding arbitration, as applicable; and (2) a public entity may prescribe reasonable change order, claim, and dispute resolution procedures and requirements in addition to the provisions of this section, so long as the contractual provisions do not conflict with or otherwise impair the timeframes and procedures set forth in this section. (g) This section applies to contracts entered into on or after January 1, 2017. (h) Nothing in this section shall impose liability upon a public entity that makes loans or grants available through a competitive application process, for the failure of an awardee to meet its contractual obligations. (i) This section shall remain in effect only until January 1, 2027, and as of that date is repealed, unless a later enacted statute, that is enacted before January 1, 2027, deletes or extends that date. 439
Agenda Item
City Council
Item #: 3.33. 6/14/2022 File #: 22-0341
TO: Honorable Mayor and Members of the City Council
THRU: Rob Houston, City Manager
FROM: Christopher Cash, Public Works Director

1. SUBJECT
Award of Contract to Palp, Inc. dba Excel Paving Company for the Katella Avenue Street Rehabilitation; Bid No. 21-22.34.

2. SUMMARY
Bids for the Katella Avenue Street Rehabilitation (SP-4144) were received and opened on June 2, 2022. Four bidders responded to the notice inviting bids. The apparent low bidder is Palp Inc. dba Excel Paving Company of Long Beach, California in the amount of $864,420.

3. RECOMMENDED ACTION

1. Authorize the appropriation of $87,000 from Measure M2 (263) unreserved fund balance to expenditure account number 263.5011.56330.30167 Katella Avenue Street Rehabilitation.

2. Approve the contract with Palp, Inc. dba Excel Paving Company in the total amount of $950,862, representing an original amount of $864,420 plus a 10% contingency of $86,442, for Katella Avenue Street Rehabilitation; and authorize the Mayor and City Clerk to execute on behalf of the City.

4. FISCAL IMPACT
The total expenditure for this contract is $950,862 and will be funded in Katella Avenue Street Rehabilitation (30167) through Measure M2 (263).

5. STRATEGIC PLAN GOALS
Goal 1: Provide for a safe community
b: Provide and maintain infrastructure necessary to ensure the safety of the public.

Goal 4: Provide outstanding public service
b: Provide facilities and services to meet customer expectations.

6. DISCUSSION AND BACKGROUND
Katella Avenue from SR-55 to Harding Street pavement falls in the “poor” pavement condition category according to the City’s Pavement Management Plan. Thus, the rehabilitation is necessary for the roadways with this pavement condition to prevent total pavement failure in the future. Also, landscaping and irrigation improvements will be made to the median island along Katella Avenue.

The City Council previously approved advertisement for bids on April 12, 2022. The bid solicitation was advertised on May 12, 2022 for a period of three weeks and bids were opened on June 2, 2022.

City of Orange Page 1 of 2 Printed on 6/9/2022
powered by Legistar™440
Item #: 3.33. 6/14/2022 File #: 22-0341
Four bids were received as follows:

1. Palp Inc. dba Excel Paving Co., Long Beach $ 864,420

2. Hardy & Harper, Inc., Lake Forest $ 870,000

3. R. J. Noble Company, Orange $ 898,746

4. All American Asphalt, Corona $1,042,162
The low bid is about 4.0% higher than the Engineer’s Estimate of $829,800. Staff checked the references and qualifications for Palp Inc. dba Excel Paving Company and found them to be acceptable, with adequate years of experience in completing contracts of similar nature to this project. Therefore, staff recommends that Palp Inc. dba Excel Paving Company be awarded the contract in the amount of $950,862, representing an original amount of $864,420 plus a 10% contingency of $86,442, for Katella Avenue Street Rehabilitation.

The proposed project is categorically exempt from the provisions of the California Environmental Quality Act (CEQA) under CEQA guidelines Section 15301 “Existing Facilities” Class 1 (c). The CEQA Notice of Exemption has been filed with the County Recorder’s Office.

Construction is scheduled to begin in August 2022 and is expected to be completed by October 2022.

7. ATTACHMENTS
· Bid Abstract
· Contract with Palp, Inc. dba Excel Paving Company
City of Orange Page 2 of 2 Printed on 6/9/2022
powered by Legistar™441
Agenda Item
City Council
Item #: 3.33. 6/14/2022 File #: 22-0341
TO: Honorable Mayor and Members of the City Council
THRU: Rob Houston, City Manager
FROM: Christopher Cash, Public Works Director

1. SUBJECT
Award of Contract to Palp, Inc. dba Excel Paving Company for the Katella Avenue Street Rehabilitation; Bid No. 21-22.34.

2. SUMMARY
Bids for the Katella Avenue Street Rehabilitation (SP-4144) were received and opened on June 2, 2022. Four bidders responded to the notice inviting bids. The apparent low bidder is Palp Inc. dba Excel Paving Company of Long Beach, California in the amount of $864,420.

3. RECOMMENDED ACTION

1. Authorize the appropriation of $87,000 from Measure M2 (263) unreserved fund balance to expenditure account number 263.5011.56330.30167 Katella Avenue Street Rehabilitation.

2. Approve the contract with Palp, Inc. dba Excel Paving Company in the total amount of $950,862, representing an original amount of $864,420 plus a 10% contingency of $86,442, for Katella Avenue Street Rehabilitation; and authorize the Mayor and City Clerk to execute on behalf of the City.

4. FISCAL IMPACT
The total expenditure for this contract is $950,862 and will be funded in Katella Avenue Street Rehabilitation (30167) through Measure M2 (263).

5. STRATEGIC PLAN GOALS
Goal 1: Provide for a safe community
b: Provide and maintain infrastructure necessary to ensure the safety of the public.

Goal 4: Provide outstanding public service
b: Provide facilities and services to meet customer expectations.

6. DISCUSSION AND BACKGROUND
Katella Avenue from SR-55 to Harding Street pavement falls in the “poor” pavement condition category according to the City’s Pavement Management Plan. Thus, the rehabilitation is necessary for the roadways with this pavement condition to prevent total pavement failure in the future. Also, landscaping and irrigation improvements will be made to the median island along Katella Avenue.

The City Council previously approved advertisement for bids on April 12, 2022. The bid solicitation was advertised on May 12, 2022 for a period of three weeks and bids were opened on June 2, 2022.

City of Orange Page 1 of 2 Printed on 6/9/2022
powered by Legistar™442
Item #: 3.33. 6/14/2022 File #: 22-0341
Four bids were received as follows:

1. Palp Inc. dba Excel Paving Co., Long Beach $ 864,420

2. Hardy & Harper, Inc., Lake Forest $ 870,000

3. R. J. Noble Company, Orange $ 898,746

4. All American Asphalt, Corona $1,042,162
The low bid is about 4.0% higher than the Engineer’s Estimate of $829,800. Staff checked the references and qualifications for Palp Inc. dba Excel Paving Company and found them to be acceptable, with adequate years of experience in completing contracts of similar nature to this project. Therefore, staff recommends that Palp Inc. dba Excel Paving Company be awarded the contract in the amount of $950,862, representing an original amount of $864,420 plus a 10% contingency of $86,442, for Katella Avenue Street Rehabilitation.

The proposed project is categorically exempt from the provisions of the California Environmental Quality Act (CEQA) under CEQA guidelines Section 15301 “Existing Facilities” Class 1 (c). The CEQA Notice of Exemption has been filed with the County Recorder’s Office.

Construction is scheduled to begin in August 2022 and is expected to be completed by October 2022.

7. ATTACHMENTS
· Bid Abstract
· Contract with Palp, Inc. dba Excel Paving Company
City of Orange Page 2 of 2 Printed on 6/9/2022
powered by Legistar™443
1 2 3 4
Bid No. 21-22.34; Project No. SP-4144
Date of Bid Opening: 6/2/2022
Tel. No. (562) 599-5841 (714) 444-1851 Tel. No. (714) 637-1550 Tel. No. (951) 736-7600 NO. DESCRIPTION OF WORK QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT 1 Cold Plane 2" Existing A.C. Pavement
SY 2.00 16,560 $ $33,120.00 $3.00 $49,680.00 $3.00 $49,680.00 $3.05 $50,508.00 $4.20 $69,552.00 2 Asphalt Rubberized Hot Mix (ARHM) -
2" Surface Course TON 110.00 1,870 $ $205,700.00 $120.00 $224,400.00 $130.00 $243,100.00 $127.00 $237,490.00 $135.00 $252,450.00 3 Asphalt Concrete Base Course 130 TON $ 120.00 $15,600.00 $150.00 $19,500.00 $215.00 $27,950.00 $170.00 $22,100.00 $145.00 $18,850.00 4 Asphalt Concrete/Subgrade Removal
(8" Unclassified Excavation) CY 100.00 180 $ $18,000.00 $115.00 $20,700.00 $80.00 $14,400.00 $165.00 $29,700.00 $133.00 $23,940.00 5 Adjust/Remove and Replace Water
Valve Box To Grade per OWD Std No.
101
EA 850.00 11 $ $9,350.00 $1,400.00 $15,400.00 $1,000.00 $11,000.00 $1,350.00 $14,850.00 $1,300.00 $14,300.00 6 Adjust Manhole Frame & Cover To
Grade per City Std. 408 EA 830.00 7 $ $5,810.00 $950.00 $6,650.00 $1,200.00 $8,400.00 $1,350.00 $9,450.00 $1,800.00 $12,600.00 7 Remove And Replace Concrete
Sidewalk Per City Std 118 & 120 SF 18.00 60 $ $1,080.00 $20.00 $1,200.00 $25.00 $1,500.00 $10.80 $648.00 $30.00 $1,800.00 8 Horizontally Saw-Cut Curb or Remove
Ex. Curb and Access Ramp, and
Construct Access Ramp with Truncated
Domes per City Std. 121
EA 8,000.00 7 $ $56,000.00 $7,000.00 $49,000.00 $7,000.00 $49,000.00 $7,500.00 $52,500.00 $9,400.00 $65,800.00 9 Remove and Replace Existing Concrete
Spandrel and Cross Gutter per City Std.
119
SF 34.00 1,910 $ $64,940.00 $23.00 $43,930.00 $30.00 $57,300.00 $27.00 $51,570.00 $35.00 $66,850.00 10 Remove Existing Curb and Gutter and
Replace with 8" Curb and Gutter Type A
per City Std. 117 (8" or Match Existing
Curb Height)
LF 100.00 160 $ $16,000.00 $86.00 $13,760.00 $85.00 $13,600.00 $108.00 $17,280.00 $125.00 $20,000.00 11 Install Traffic Signing and Striping,
Legends, and RPM's (Thermoplastic)
per City's Plan and MUTCD
LS 30,000.00 1 $ $30,000.00 $13,000.00 $13,000.00 $15,000.00 $15,000.00 $13,500.00 $13,500.00 $15,000.00 $15,000.00 12 Furnish and Install Landscaping and
Irrigation System per Plan, Inclusive of
90-Day Maintenance Period
LS 200,000.00 1 $ $200,000.00 $91,000.00 $91,000.00 $90,000.00 $90,000.00 $98,000.00 $98,000.00 $100,000.00 $100,000.00 13 Traffic Control 1 LS $ 60,000.00 $60,000.00 $179,000.00 $179,000.00 $154,270.00 $154,270.00 $168,500.00 $168,500.00 $252,000.00 $252,000.00 14 Furnish and Install Type "E" Detector
Loops EA 300.00 30 $ $9,000.00 $300.00 $9,000.00 $300.00 $9,000.00 $430.00 $12,900.00 $310.00 $9,300.00 15 Remove and Replace Traffic Signal or
Street Light Pull Box (To be Determined
by the City Inspector) (D) EA 600.00 3 $ $1,800.00 $2,000.00 $6,000.00 $1,200.00 $3,600.00 $750.00 $2,250.00 $740.00 $2,220.00 16 Asphalt Concrete Level Course - 1"
Depth TON 110.00 940 $ $103,400.00 $130.00 $122,200.00 $130.00 $122,200.00 $125.00 $117,500.00 $125.00 $117,500.00 Grand Total $829,800.00 $864,420.00 $870,000.00 $898,746.00 $1,042,162.00

PAVEMENT IMPROVEMENTS

ENGINEER'S ESTIMATE
Katella Avenue Street Improvement
Palp, Inc. DBA Excel Paving Co Hardy & Harper, Inc. R. J. Noble Company All American Asphalt Long Beach, CA Lake Forest, CA Orange, CA Corona, CA
City of Orange: Summary of Bid Abstracts for:

Page 1 of 1 ends
← All documents from this meeting