Cities Index.
Agenda packet, regular meeting

Palm Desert City Council
June 12, 2025

Document
Agenda packet, regular meeting
Meeting
June 12, 2025
Body
Palm Desert City Council
Pages
74
Original file
473.7 MB
Text extracted from the city's file for reading and search. Open the original on pub-palmdesert.escribemeetings.com. That file is the official record.

7) HAZARDOUS MATERIALS. GeoTek is not a generator, transporter and does not store or dispose of hazardous waste or non hazardous waste. Client will be responsible for the proper management, storage and disposal of hazardous waste or non hazardous waste present on the site and that may be encountered whether or not identified during GeoTek’s evaluation.

Mr. Andrew Krumwiede
10221-A Trademark Street (909) 484-2800
City:
[email protected]
CA
GeoTek, Inc., a Nevada Corporation
P-0300325-CR(the “Proposal”), the terms of which are
Rancho Cucamonga Fax No:

Phone No:

Cell Phone:

Attention:

Address 1:

Address 2:

Email:
incorporated herein by reference and made a part of this Agreement (defined below) will constitute the agreement between Client, as identified above, and Date: 3/3/2025
P-0300325-CR
Project No:

Name: Architerra Design Group
--
City of Palm Desert - Geotechnical and Infiltration Evaluations Palm Desert, Riverside County, California
Scope and estimated fees are outlined in text of proposal and/or below under "Special Instructions." Services not outlined in the proposal or in this Agreement, are not included in the scope of this contract and will be invoiced separately as Additional Services (as provided in Paragraph 4 below). All services, including any Additional Services, are subject to the Terms and Conditions below. $73,068.00
Scope of Services:

Project Location:

Project Name:

Fee Estimate: COD:
2) FEES/QUOTATIONS. Unless otherwise specified, the Proposal will define the: (1) Services to be provided, (2) the estimated fee and expense amount(s) for such Services, and (3) the billing type or method (e.g. time and materials, lump sum, fixed fee to a maximum, etc.). Client agrees to pay GeoTek its quoted rates for the Services and any Additional Services (as defined below) and products provided subject to changes in pricing from time to time. Any quotation will be good for a period of thirty (30) days from the date of the quotation. Quotation(s) of fees and expenses are estimates only. The actual fees and expenses will be shown when the final invoice is tendered.
(“GeoTek”) for performance of the professional services outlined in the Proposal, (“Services”). 3) BILLING AND PAYMENT. Invoices will be submitted on a progress basis for all Services performed during the term of the project. All invoices are due and payable upon receipt. Any and all invoices or any portion thereof, outstanding after thirty (30) days will accrue interest at 1.5% per month but in no event more than the maximum rate permissible by law from the original date of the invoice until paid.

GeoTek is willing to provide the Services for consideration and upon the terms set forth in the Proposal and hereinafter stated. This Work Authorization and Agreement and the Proposal will be referred to collectively hereinafter as the “Agreement”. Any future work performed for Client will be under the terms of this Agreement unless a new agreement is executed in writing by both parties. 5) RIGHT OF ENTRY.
a) Client hereby grants GeoTek the right of entry to the job site to permit GeoTek to perform the work under this Agreement. Client warrants that it has the authority to grant such right of entry.
b) Client acknowledges that excavations or destructive testing may be required to perform portions of the Services. Excavations will be backfilled in a prudent manner but cannot be returned to the previous condition. Damage to landscaping or natural vegetation may result. Client will indemnify and hold GeoTek harmless from any and all damages to persons or property caused by or to GeoTek or third parties as a result of the Services.

Contract Revision 2022
6) PERFORMANCE.
a) Governmental rules and regulations are subject to interpretations. GeoTek will prepare all reports with a view toward complying with governmental rules and regulations, but no guarantee is given that any or all reports will be approved by the applicable governmental agency. b) GeoTek is relying entirely on plans and maps given to GeoTek by the Client or Client's agents, representatives or designees. Client will indemnify and hold GeoTek harmless from any and all damages to person or property caused by or to GeoTek or third parties resulting from undisclosed underground conditions or errors or inaccuracy of plans, maps or any other information provided by the Client or Client's agents, representatives or designees to GeoTek. c) GeoTek will not be responsible for delays or its failure to perform as a result of inclement weather, accidents, acts of God, public insurrection, war, labor difficulties, riots, interference by governmental agencies, or any other act reasonably beyond GeoTek's control. d) Client will disclose in writing to GeoTek any and all known or suspected hazardous or toxic conditions or materials present at the job site and will indemnify, defend and hold GeoTek harmless from and against any and all liability, costs, attorneys or expert fees or damage to person or property arising from hazardous or toxic conditions or materials present at the job site. 743
GeoTek, Inc. Work Authorization And Agreement
Contract Revision 2022
13) OWNERSHIP OF INSTRUMENTS OF SERVICE. All reports, drawings, specifications, computer files, field data, notes and other documents and instruments prepared by GeoTek as instruments of service will remain the property of GeoTek. GeoTek will retain all common law, statutory and other reserved rights, thereto. All documents prepared by GeoTek under this Agreement for a particular project are not intended and not represented to be suitable for reuse by Client or others on any other project. Any such reuse without written authorization from GeoTek will be without liability to GeoTek and Client agrees to indemnify, defend, and hold harmless GeoTek from and against any and all losses, claims, damages and expenses (including attorney’s fees) arising out of or resulting therefrom.
f) Notwithstanding any other provision of this Agreement, neither the Client nor GeoTek, their respective officers, directors, partners, employees, contractors or subconsultants will be liable to the other or will make any claim for any incidental, indirect or consequential damages arising out of or connected in any way to the Project or to this Agreement. This mutual waiver of consequential damages will include, but is not limited to, loss of use, loss of profit, loss of business, loss of income, loss of reputation and any other consequential damages that either party may have incurred from any cause of action including negligence, strict liability, breach of contract and breach of strict or implied warranty. Both the Client and GeoTek will require similar waivers of consequential damages protecting all the entities or persons named herein in all contracts and subcontracts with others involved in this project.

Page 2 of 2 ends

8) PROFESSIONAL OPINION. GeoTek’s professional services will be performed, findings obtained, and recommendations prepared in accordance with generally accepted engineering practices in effect at the time and place the services are performed. The professional opinions of GeoTek will be based upon conditions revealed at exploration locations and reconnaissance of surrounding terrain or through research efforts. The services on any given site are limited. It is agreed that GeoTek is not responsible for the affect that unknowns such as acts of others on adjacent properties, variables of nature including, but not limited to, earthquakes, the works of man, Acts of God, and other variables beyond the control of GeoTek may have on any opinion rendered hereunder. No opinions of any kind are given by GeoTek except those expressly stated in GeoTek's written reports. GeoTek does not warrant (either expressed or implied) or guarantee any of its recommendations, opinions or Services. 9) INSURANCE. GeoTek maintains worker's compensation and public liability insurance policies for bodily injury and property damage. Certificates of insurance will be furnished upon request. With regard to property claims, GeoTek will not be responsible for damage beyond those amounts paid under the policies. GeoTek will not be responsible for any consequential, lost profits, business interruption, or other damages claimed by Client. Requests for waivers of subrogation or other endorsements are subject to a 5% fee surcharge. 10) INDEMNIFICATION and LIMITATION OF LIABILITY.
a) GeoTek agrees, subject to the limitations herein, to indemnify and hold harmless Client from and against damages, liability and reasonable costs arising from the negligent acts of GeoTek in the performance of its Services under this Agreement, but only to the extent that a court of competent jurisdiction determines GeoTek is responsible for such damages, liability and reasonable costs on a comparative fault basis. Notwithstanding the foregoing agreement to indemnify Client, the parties expressly agree that GeoTek has no duty to defend Client from or against any claims, damages, liabilities, judgments, demands, causes of action, costs, expenses, or proceedings of any kind. GeoTek will not be obligated to indemnify Client for Client's own negligence or the negligence of others.
b) Client agrees, subject to limitations herein, to indemnify and hold harmless GeoTek from and against damages, liability, and reasonable costs arising from the negligent acts of Client related to any work performed under this Agreement, but only to the extent that a court of competent jurisdiction determines the Client is responsible for such damages, liability, and reasonable costs on a comparative fault basis. Notwithstanding the foregoing agreement to indemnify GeoTek, the parties expressly agree that the Client has no duty to defend GeoTek from or against any claims, damages, liabilities, judgments, demands, causes of action, costs, expenses, or proceedings of any kind. Client will not be obligated to indemnify GeoTek for GeoTek’s own negligence or the negligence of others.
c) Client acknowledges that it is aware of the risks involved in construction, limitations inherent to the contract Services, and variations that can exist from the conditions identified. Client agrees to limit any liability, claim for damages to person or property, attorneys fees, expert fees or other costs of defense, or expenses (collectively "Claims") to be levied against GeoTek arising out of or relating to any design defect, error, omission, professional negligence or other promise of GeoTek (collectively "Liabilities") to the amount of GeoTek's fees paid under the Agreement. This limitation will apply regardless of the cause of action or legal theory pled or asserted. The fee charged Client for the Services to be rendered pursuant to this Agreement has been established with regard to the legal effect of this Limitation of Liability section. Increased limits of liability can be negotiated for an increased fee. d) Except for work performed or provided by those subcontractors or subconsultants retained directly by GeoTek for whom GeoTek is legally liable, GeoTek assumes no responsibility or liability for work, testing, design(s) or recommendations performed or provided by others including, without limitation, other contractors, subcontractors, or consultants of any tier. e) The parties understand and agree that Client’s sole and exclusive claim, demand, suit, judgment and/or remedy for any claims arising from or in any way related to the performance of the Services provided under this Agreement will be directed and/or asserted only against GeoTek and not against any of GeoTek’s shareholders, engineers, employees, officers, or directors. 12) JOBSITE SAFETY. Neither the professional activities of GeoTek nor the presence of GeoTek or its employees and subconsultants at a construction/project site, will relieve the General Contractor of its obligations, duties and responsibilities including, but not limited to, construction means, methods, sequence, techniques or procedures necessary for performing, superintending and coordinating the Work in accordance with the contract documents and any health or safety precautions required by any regulatory agencies. GeoTek and its personnel have no authority to exercise any control over any construction contractor or its employees in connection with their work or any health or safety programs or procedures. The Client agrees that the General Contractor will be solely responsible for Jobsite safety, and warrants that this intent will be carried out in the Client’s contract with the General Contractor. The Client also agrees that the Client, GeoTek and GeoTek’s subconsultants will be indemnified by the General Contractor and will be made additionally insured under the General Contractor's policies of general liability insurance.
11) DISPUTE RESOLUTION. In an effort to resolve any conflicts that arise during the design and construction of the project or following the completion of the project the Client and GeoTek agree that all disputes between them arising out of or relating to this Agreement or the project will be submitted to non binding mediation unless the parties mutually agree otherwise.
744
GeoTek, Inc. Work Authorization And Agreement
By: By:

Title: Title:
14) FORCE MAJEURE. Force Majeure as used in this Article will mean an act of God, strike, lockout, or other industrial disturbance, act of public enemy, war, blockage, public riot, lightning, fire, flood, explosion, earthquake, failure to timely receive necessary governmental approvals government restraint, unavailability of equipment, and any other cause, whether of the kind specifically enumerated above or otherwise, other than financial liability, which is not reasonably within the control of the party claiming suspension. If either party is rendered unable, wholly or in part, by Force Majeure to carry out their obligations under this Agreement, other than the obligation to make money payments, such party will give to the other party prompt written notice of the Force Majeure with reasonably full particulars concerning it; thereupon, the obligations of the party giving notice, so far as they were affected by the Force Majeure, will be suspended during, but no longer than, the continuance of the Force Majeure. The affected party will use all possible diligence to remove the Force Majeure as quickly as possible.
15) TERMINATION.
a) In the event of termination of this Agreement by either party for any reason, the Client will within fifteen (15) calendar days of termination pay GeoTek for all Services rendered and all reimbursable costs incurred by GeoTek up to the date of termination, in accordance with the payment provisions of this Agreement. b) The Client may terminate this Agreement for the Client's convenience and without cause upon giving GeoTek not less than seven (7) calendar days written notice.
c) Either party may terminate this Agreement for cause upon giving the other party not less than seven (7) calendar days written notice for any of the following reasons:
i.) Failure by the other party to materially perform in accordance with the terms of this Agreement and through no fault of the terminating party; ii.) Assignment of this Agreement or transfer of the Project by either party to any other entity without the prior written consent of the other party; iii.) Material changes in the conditions under which this Agreement was entered into, the scope of Services or the nature of the Project, and the failure of the parties to reach agreement on the compensation and schedule adjustments necessitated by such changes. d) In the event of any termination that is not the fault of GeoTek, Client will pay GeoTek, in addition to payment for services rendered and reimbursable costs incurred, for all expenses reasonably incurred by GeoTek in connection with the orderly termination of this Agreement, including without limitation, demobilization, reassignment of personnel, overhead costs and all other expenses directly resulting from the termination.

Contract Revision 2022
17) MISCELLANEOUS.
a) All terms of this Agreement will be governed by and construed under the law of the State in which the Services are provided. Diversity of the parties will not determine jurisdiction.
b) No provision of this Agreement will be interpreted for or against any party because that party or its legal representative drafted the provision. c) In the event that legal action is taken to enforce the terms of this agreement or resolve a dispute the prevailing party will be entitled to reasonable attorney's fees and costs incurred.
d) Failure by a party to exercise any right, remedy, or option in this Agreement or delay by a party in exercising the same will not operate as a waiver. No waiver will be effective unless it is in writing.
e) Every provision of this Agreement is intended to be severable. If any term or provision hereof is declared by a court of competent jurisdiction to be illegal, invalid or unenforceable for any reason whatsoever, such illegality, invalidity or unenforceability will not affect the balance of the terms and provisions hereof, which terms and provisions will remain in full force and effect. f) This Agreement may be executed at different times and in multiple counterparts, including, without limitation, facsimile counterparts, each of which will be deemed an original, but all of which together will constitute one and the same instrument. g) Client may not assign its rights or obligations under this Agreement without the express written consent of GeoTek. GeoTek may assign its rights and obligations under this Agreement to any of its affiliate companies without Client's consent upon written notice to Client. In the event of such an assignment, the assignee will assume the obligations of GeoTek under this Agreement as though such assignee had been an original party to this Agreement.

Printed Name
18) AMENDMENTS. Except as specifically provided herein, no addition(s) to or modification(s) of this Agreement will be binding on either party unless made in writing and executed and initialed by GeoTek and Client.

Signature
Printed Name
Ed LaMont, CEG
16) SUSPENSION OF SERVICES.
a) If the Project or GeoTek's Services are suspended by the Client for more than thirty (30) calendar days, consecutive or in the aggregate, over the term of this Agreement, GeoTek will be compensated for all Services performed and reimbursable expenses incurred prior to the receipt of notice of suspension. In addition, upon resumption of Services, the Client will compensate GeoTek for expenses incurred as a result of the suspension and resumption of its Services, and GeoTek's schedule and fees for the remainder of the Project will be equitably adjusted. b) If GeoTek’s Services are suspended for more than ninety (90) days, consecutive or in the aggregate, GeoTek may terminate this Agreement upon giving not less than five (5) calendar days written notice to the Client. c) If the Client is in breach of the payment terms or otherwise is in breach of this Agreement, GeoTek may, at its sole discretion, suspend performance of services and/or withhold any and all reports and work product. In the event GeoTek suspends performance and/or withholds reports and work product pursuant to this provision, GeoTek will not be in default of this Agreement and GeoTek will have no liability to the Client. Client agrees to make no claim against GeoTek for any delay or damage as a result of such suspension and/or withholding of reports and work product and agrees to defend and indemnify GeoTek from and against any and all claims for damages including, without limitation, claims for delay, lost profit, business interruption, consequential or any other damages resulting from the suspension of services and/or withholding of any report and work product. Upon receipt of payment in full of all outstanding sums due from the Client, or curing of such other breach which caused GeoTek to suspend Services and/or withhold reports and work product, GeoTek will resume Services and/or provide Client with the applicable reports and work product and there will be an equitable adjustment to the remaining project schedule and fees as a result of the suspension.

Page 3 of 3 ends

Signature
Branch Manager P-0300325-CR
CLIENT'S Authorized Signature of Acceptance: CONSULTANT Authorized Signature of Acceptance:

By Signing below, the parties accept the services outlined in the proposal, the rates indicated on any attached fee schedule, and all the terms and conditions contained within each page of this Agreement, including but not limited to attachments and exhibits. 745
Soils and Asphalt Continued
Description Unit Rate Unit
Unit Rate Unit
Permeability, Flexible Wall, Cohesive Soil ASTM D5084 $ 666.00 Each Principal Engineer/Geologist $ 246.00 Hour "R" Value ASTM D2844/CT 301 $ 439.00 Each Geotechnical Engineer $ 213.00 Hour Resistivity of Soil ASTM G57 and pH ASTM D4972 $ 173.00 Each Project Engineer/Geologist $ 179.00 Hour Sand Equivalent ASTM D2419/CT 217 $ 153.00 Each Staff Engineer/Geologist $ 167.00 Hour Sieve Analysis of Extracted Aggregate ASTM D5444 $ 100.00 Each Field Engineer/Geologist $ 140.00 Hour Sieve Analysis, 3" to #200 Gradation ASTM C117 $ 202.00 Each Field Supervisor $ 130.00 Hour Sieve Analysis Minus #200 by Wash ASTM D1140/C117 $ 100.00 Each Project Adminstration/Drafting $ 82.00 Hour Soil Classification, ASTM D 2487 $ 373.00 Each Soil Moisture/Density In Situ Sample ASTM D1587/D2937 $ 40.00 Each Water Soluble Sulfate $ 79.00 Each
Unit Rate Unit Organic Content, ASTM D 2974 $ 60.00 Each Lead Inspector $ 107.00 Hour Concrete and Aggregate Tests Certified Welding Inspector(AWS/CWI) $ 118.00 Hour Description Unit Rate Unit Soils Technician $ 94.00 Hour
ICC Certified Inspector(RC, PC, RM, SS, FP) $ 94.00 Hour Specific Gravity & Absorption Coarse Agg. ASTM C127 $ 100.00 Each ACI Technician $ 94.00 Hour Specific Gravity & Absorption Fine Agg. ASTM C128 $ 100.00 Each Proof Load Testing $ 167.00 Hour Trial Batches ASTM C192 Each Floor Flatness Technician Quote Upon Request Durability Index Coarse & Fine Aggregate ASTM D3744 $ 159.00 Each Ground Penetrating Radar: One Man Crew $ 267.00 Hour Lightweight Concrete Unit Weight ASTM C495 $ 47.00 Each Ground Penetrating Radar: Two Man Crew $361.00 Hour Modulus of Elasticity of Concrete ASTM C469 $ 267.00 Each Non-Destructive Testing (ASNT): Level III Review $ 267.00 Hour Sieve Analysis, Coarse Aggregate ASTM C136/CT 202 $ 132.00 Each Magnetic Particle Testing Level II $ 178.00 Hour Sieve Analysis, Fine Agg #4 to #200 ASTM C117/C136 $ 202.00 Each Ultrasonic Testing Level II $ 178.00 Hour Specific Gravity & Absorption Coarse Agg. ASTM C127 $ 100.00 Each Radiographic Inspection Quote Upon Request Specific Gravity & Absorption Fine Agg. ASTM C128 $ 100.00 Each Coring: Coring Machine Operator with equipment $ 167.00 Hour Splitting Tensile/Concrete Cylinder ASTM C496 $ 68.00 Each Coring: Helper (Add Per Hour) $ 94.00 Hour L.A. Rattler, ASTM C131 or C535/Cal 211 $ 399.00 Each Wood Fabrication Inspection $ 147.00 Hour Sulfate Soundness (per sieve), ASTM C88 $ 719.00 Each Nailing Inspection $ 118.00 Hour Unit Weight of Aggregates, ASTM C29 $ 159.00 Each Roofing Inspection $ 118.00 Hour Cleanness Value, CT 227 $ 159.00 Each Laboratory Technician Quote Upon Request Hour Moisture Content of Aggregate ASTM C29 $ 100.00 Each Sample Pick-up Driver (If not done on a per trip basis) $ 94.00 Hour Concrete Shrinkage, set of 3, ASTM C157, CT 530 $ 534.00 Each
ENVIRONMENTAL AND GEOTECHNICAL INVESTIGATIONS Compression 4x8 Cylinders ASTM C39 $ 40.00 Each Description Unit Rate Unit Compression, 6x12 Cylinders, ASTM C39 $ 40.00 Each Phase 1 and Phase 2 Reports Quote Upon Request Compression, 3X6 Cylinders Lightweight ASTM C495 $ 60.00 Each Geotechnical Investigation Report Quote Upon Request Compression, 2X2 Cubes, each age, ASTM C109 $ 40.00 Each Percolation or Infiltration Testing Quote Upon Request Concrete Core Compression ASTM C42 $ 95.00 Each Splitting Tensile, 6X12 Cylinders, ASTM C496 Per-diem, Including Lodging (Beyond 100-Mile Radius) $ 100.00 Each LABORATORY TESTS Unit Weight of Concrete Cylinders, ASTM C567 $ 60.00 Each Soils and Asphalt Unit Weight of Lightweight ASTM C495 $ 74.00 Each Description Unit Rate Unit Flexural Strength of Concrete, ASTM C78 or C495 $ 100.00 Each Shotcrete Panel Core Compression Test, ASTM C42 $ 147.00 Each Asphalt Content by Ignition $ 405.00 Each Emission of Moisture through Concrete $ 132.00 Each Burn-Off Method CT 382/ASTM D6307 $ 399.00 Each
Bitumen Content (extraction), ASTM D2172 $ 266.00 Each Masonry Tests Bitumen Content CT 310/Cal 382 Ignition Furnace $ 200.00 Each Description Unit Rate Unit Gradation of Extracted Sample, ASTM C 136/CT 202 $ 405.00 Each Maximum Specific Gravity, (Marshall) ASTM D2041 $ 399.00 Each Brick Absorption ASTM C67 $ 33.00 Each Collapse/Swell ASTM D4546 $ 127.00 Each Brick Compression ASTM C67 $ 68.00 Each Compaction, Modified Proctor ASTM D1557 $ 260.00 Each Dimensional Measurement-Masonry Units ASTM C140 $ 100.00 Each Compaction, Modified Proctor ASTM D698 $ 260.00 Each Masonry Unit Compression Gross Area ASTM C140 $ 147.00 Each Hveem Maximum Density, CT 304/308 $ 466.00 Each Masonry Unit Compression Net Area ASTM C140 $ 114.00 Each Consolidation ASTM D2435, D4546 $ 300.00 Each Absorption & Moisture of Block ASTM C140 $ 33.00 Each Corrosivity Suite D4972, G57, D4327, D46589M $ 270.00 Each Compression, Grout Prisms, ASTM C39 $ 40.00 Each Direct Shear, Consolidated-Drained ASTM D3080 $ 320.00 Each Compression, Mortar Cylinders, ASTM C39 $ 40.00 Each Direct Shear, Residual ASTM D6467 Mod $ 320.00 Each Compression, Composite Prisms, ASTM E447 $ 147.00 Each Expansion Index Test UBC 29-2/ASTM D4829 $ 202.00 Each Compression, Masonry Core, ASTM C140 $ 100.00 Each Liquid Limit, Plactic Limit and P.I. ASTM D4318 $ 200.00 Each Shear, Masonry Core, CCR Title 24 $ 132.00 Each Particle Size Analysis of Soil #4 to Fines ASTM D422 $ 380.00 Each Epoxy Grout 2x2x2 Cube Compression ASTM C579 $ 40.00 Each Specific Gravity of Soil, ASTM D854 $ 229.00 Each Masonry Composite Prism Compression ASTM C1314 $ 213.00 Each Percent Finer than #200 Sieve ASTM D1140 $ 159.00 Each Grout Prism - Compression Test ASTM C1019 $ 40.00 Each Permeability of Granular Soils ASTM D2434 $ 232.00 Each

GEOTECHNICAL, SPECIAL INSPECTION AND CONSTRUCTION MATERIALS TESTING SERVICES Staff Type
Riverside 2024 Master fee Schedule (Non-Prevailing Wage Project) Staff Type

PERSONNEL RATES
Professional and Project Management
Inspectors and Technicians
746
Reinforcing Steel Tests Miscellaneous
Description Unit Rate Unit Description Unit Rate Unit
Bend Test of Rebar #11 ASTM A370 $ 132.00 Each Concrete Mix Design Review $ 246.00 Each Bend Test of Rebar #14 ASTM A370 $ 227.00 Each Weld Procedure Review $ 267.00 Each Bend Test of Rebar #3 - #10 ASTM A370 $ 107.00 Each QA/QC Plan Written Procedures Quote Upon Request Tensile #11 Rebar ASTM A370 $ 107.00 Each Administrative/Clerical Services $ 82.00 Each Tensile #14 Rebar ASTM A370 $ 267.00 Each
Tensile Test #3 - #10 ASTM A370 $ 100.00 Each
Prestressing Steel Tests BASIS OF CHARGES
Description Unit Rate Unit Description Unit Rate Unit
Yield Strength, Breaking Strength, Elongation $ 399.00 Each (add $ 50.00 per test; for Modulus of Elasticity) Work from 0-4 hours 4-Hour Minimum Billing Work from 4-8 hours 8-Hour Minimum Billing
Structural Steel Tests Project Management as Project Engineer/Geologist 1- Hour Minimum weekly Description Unit Rate Unit Work over 8 hours per day, or on Saturdays Time and One-Half Work over 12 hours per day Double Time
High Strength Bolts/Nuts/Washer Compliance Test ASTM F606 $ 200.00 Each Work on Sundays/Holidays Double Time Mild Steel Not Over 1" Thick Each Show-Up Time 2-Hour Minimum Billing Tensile Strength, ASTM A370 (test only) $ 200.00 Each Laboratory Testing - Rush Fee Add 50% to Testing Cost Anchor Bolts, A 505 $ 279.00 Each Outside Services/Reimbursables Cost + 20% Tensile Strength $ 267.00 Each Shipping Charges Cost + 20% Bolts Proof Load or Ultimate $ 167.00 Each Parking/Tolls At Cost Hardness (Rockwell) $ 68.00 Each Certified Payroll Compliance $150 per month Deputy Inspectors (If applicable) $ -
Fireproofing Tests Travel Time (Beyond 60-Mile Radius of Project Site) $ 94.00 Description Unit Rate Unit Per-diem, Including Lodging (Beyond 100-Mile Radius) Quote Upon Request Fireproofing Adhesion / Cohesion Test Kit ASTM E736 $ 68.00 Each Fireproofing Density Test ASTM E605 $ 60.00 Each GeoTek reserves the right to increase fees on a yearly basis 747
March 7, 2025
Drew Krumwiede
Architerra Design Group
10221-A Trademark Street
Rancho Cucamonga, CA 91730
Email: [email protected]
RE: 2024-RFP-26 Park and Trailhead Engineering and Design (City of Palm Desert) Dear Mr. Krumwiede:

ECORP Consulting, Inc. (ECORP) is pleased to provide Architerra Design Group (Client) with this proposal for environmental services in support of a project to design and provide construction support for multiple parks and trailheads within the City of Palm Desert (City). The City’s many parks and trails are used by residents and visitors for recreation, sight-seeing, and the enjoyment of nature. Providing opportunity for high-quality outdoor experiences is a priority for the City, and several park and trailhead facilities have been identified for improvements. Two of the parks will need environmental services by an outside consultant – Homme-Adams Park (trailhead) and Randall Henderson Trailhead, both of which are located on the perimeter of the City limits near extensive natural areas.

1.0 PROJECT UNDERSTANDING
The City of Palm Desert (City) proposes the development of several parks, including Homme-Adams and Randall Henderson Trailhead, for the purpose of allowing the general public better accommodation during recreational activities. Both parks are located adjacent to the foothills surrounding Palm Desert and consist of largely undeveloped lands with some parking and natural trail areas being the primary features.

Homme-Adams Park, located on 27 acres generally on Thrush Road, serves as trailhead for the Cahuilla Hills Trail System. The Randall Henderson Trailhead is directly adjacent to lands of the Bureau of Land Management Santa Rosa Hills and provides access to a large network of trails. We have assumed a total of 25 acres to survey for the design for this facility.

All seven of the Projects would be subject to the California Environmental Quality Act (CEQA), but most of them are expected to only require a Categorical Exemption, which would be conducted by the City. The appropriate environmental document for both Homme-Adams Park and Randall Henderson Trailhead is likely to be an Initial Study/Mitigated Negative Declaration (IS/MND) with supporting technical studies.

ECORP’s scope of work, cost, and schedule for these services are provided below in accordance with the typical process and measures stipulated within the RFP for the Project (2024-RFP-26), information provided at the pre-bid meeting for the Project and subsequent addenda. To the RFP. 748
2024-RFP-26 Park and Trailhead Engineering and Design – ECORP Consulting, Inc. Bid (P25-108)

2.0 COMPANY PROFILES
ECORP Consulting, Inc.

Established in 1987, ECORP Consulting, Inc. (ECORP) is a California “S” Corporation that specializes in assisting government agencies and private clients with a wide range of environmental services. ECORP is a financially sound firm with five offices (Redlands, Santa Ana, Rocklin, San Diego, and Chico) serving clients throughout California. ECORP provides support over the life of a project, from initial baseline studies; to environmental planning, documentation, and review; permit negotiation, liaison with resource agencies, and mitigation design; and through to construction monitoring and compliance reporting. ECORP brings an experienced team of more than 120 CEQA and NEPA specialists, terrestrial and aquatic biologists, wetlands specialists, paleontologists, archaeologists/cultural resource specialists, air quality/greenhouse gas specialists, noise analysis specialists, geographic information systems (GIS) specialists, and unmanned aerial systems (UAS) pilots. ECORP’s parks experience includes as-needed environmental services contracts with California Department of Parks and Recreation as well as individual parks projects for numerous counties and cities throughout southern California.

Our Coachella Valley experience includes:
• As-needed environmental services contracts with the Coachella Valley Water District • As-needed environmental services contracts with Caltrans District 8 • Individual project contracts with the Coachella Valley Association of Governments (including biological resources monitoring for the construction of the CV Link Project and CEQA and NEPA documentation for several bike lane projects) • Project contracts with Riverside County, and the cities of La Quinta, Indio, Desert Hot Springs and Indian Wells.

KOA Corporation
Founded in 1987, KOA Corporation (KOA) is a leading provider in professional services in transportation engineering, mobility planning, and construction management for public agencies and private sector clients. We offer our clients technical knowledge, innovative solutions, and responsive services. Our focus on safety for all travelers is the foundation of our professional practice. KOA engineers, planners, construction field specialists, and project managers all take pride in our well-established reputation as Transportation Safety Experts. The hallmark of our success is our dedication to each and every project and our desire to leave a legacy of extraordinary contribution to our communities. Our staff includes registered civil and traffic professional engineers, certified transportation planners, certified road safety professionals, project/construction managers, and construction inspectors. With four offices located in Southern California, KOA provides professional consulting services for some of the largest public-works and planning projects for all modes of transportation throughout California.

In December 2022, KOA joined Lochner, a national transportation infrastructure firm headquartered in Chicago, Illinois, providing planning, environmental, design, construction engineering and inspection, and 749
2024-RFP-26 Park and Trailhead Engineering and Design – ECORP Consulting, Inc. Bid (P25-108) right-of-way services for surface transportation, rail, transit, and aviation clients. Together, we have more resources and capabilities for delivering innovative solutions and enhancing the quality of life in the communities we serve. Representative Projects are below:
• LOS and VMT Transportation Impact Study for Needles General Plan • Traffic Impact Study for Sixth Street Beautification Project, City of Corona • Wildcat Energy Farms Battery Energy Storage System Level-of-Service Study, Brawley

SCOPE OF SERVICES
Below is our detailed scope of services for the two projects mentioned above, broken out by specific park, although the services for each endeavor will be similar Hommes Adams Trailhead
Task 1 – CEQA Initial Study/Mitigated Negative Declaration Task 1A – Administrative Draft IS/MND
An IS/MND will be prepared using the approved checklist format from the City of Palm Desert or Appendix G of the current CEQA Guidelines. ECORP will prepare a brief description of the environmental setting; an identification of environmental effects using the above-referenced checklist format, a brief substantiation of the checklist entries, and a list of references and preparers. A land use and planning consistency analysis will be conducted by ECORP as part of the IS/MND. ECORP will also analyze potential utility and service system impacts of the proposed project. Record/database searches for hazards/hazardous materials will also be conducted. ECORP will provide mitigation measures (if required) that can be developed using existing data.

Task 1A Assumptions:
♦ We have assumed we will receive copies of any previously prepared technical reports, plans, and other Project information from the City, including electronic versions, to the extent possible. ♦ According to the RFP, federal funding may be utilized based on the availability and successful application for grant programs. If federal funding is obtained for the Project, compliance with the National Environmental Policy Act (NEPA) would be required. If these services are requested by the City, ECORP would provide a contract change order.

Task 1A Deliverables:
♦ An electronic copy of the Administrative Draft IS/MND will be submitted to the City via email for review and comment
750
2024-RFP-26 Park and Trailhead Engineering and Design – ECORP Consulting, Inc. Bid (P25-108) Task 1B – Prepare and Distribute Draft IS/MND and Notices After receipt of one (1) set of integrated comments on the Administrative Draft IS/MND from the City, we will revise the IS/MND accordingly. ECORP will provide five (5) bound copies and one (1) electronic copy of the environmental document to the City for internal use. ECORP will mail twenty (20) hard copies of the Notice of Intent (NOI) document to addressees on the mailing list, which will include the City website where the environmental documentation and notices for the Project can be viewed online. ECORP will electronically file the environmental document and corresponding notices with the State Clearinghouse and provide an electronic copy to the City for their website. We have assumed that the City and ECORP will work together to assemble the mailing list. ECORP will prepare the following notices as required by CEQA:
♦ Notice of Intent (NOI) to Adopt a Mitigated Negative Declaration ♦ Notice of Completion (State Clearinghouse Cover)
♦ Environmental Summary Form (for the State Clearinghouse) ECORP will prepare, publish, file, and distribute a Notice of Intent (NOI) to Adopt a Mitigated Negative Declaration. One copy of each of these notices will be filed with the Los Angeles County Clerk and the State Clearinghouse. ECORP will also distribute the NOI to responsible and trustee agencies as well as other interested parties. One electronic copy of each notice will be provided to the City. The NOI is required by CEQA to be either posted on-site, mailed to the surrounding property owners, or published in a newspaper of general circulation. For costing purposes, it has been assumed that ECORP will arrange for the NOI to be published in a newspaper of general circulation. Newspaper fees are included in the cost estimate.

Task 1B Deliverables:
♦ Five (5) bound copies and one (1) electronic copy of the Draft IS/MND for City use ♦ Twenty (20) hard copies of the Notice of Intent (NOI) document ♦ Notice of Intent, Notice of Completion, and Environmental Summary Form ♦ Newspaper ad for NOI
♦ Additional copies will be billed on a time-and-materials basis Task 1C – Final IS/MND, MMRP, and Notice of Determination The Lead Agency (City) must consider any comments received on the MND when making a decision on the Project. For costing, we have assumed that ten (10) comment letters containing three (3) comments each will be received (or a total of 30 comments). ECORP will collate all public comments and comment letters regarding the Initial Study and prepare written responses to comments for City review. It is assumed that City staff will receive all comments and will forward to ECORP as soon as possible after receipt.

The Final IS/MND will include responses to comments received on the Draft IS/MND, any changes to the Draft IS/MND, and the Mitigation Monitoring and Reporting Program (MMRP, if required) prepared in accordance with CEQA Guidelines Section 15097. ECORP will prepare the MMRP in table format, with 751
2024-RFP-26 Park and Trailhead Engineering and Design – ECORP Consulting, Inc. Bid (P25-108) input from the City. An Administrative Final IS/MND and MMRP will be prepared, and after review by the City, the Final IS/MND and MMRP will be provided.

ECORP will prepare a Notice of Determination (NOD) as required by CEQA. A copy of the NOD will be filed with the Riverside County Clerk and the State Clearinghouse, as appropriate, within five business days of adoption of the IS/MND. An electronic copy of the NOD will be provided to the City. It has been assumed that the City will pay any fees associated with the NOD. The CDFW filing fee for an MND is $2,968.75. The County Clerk filing fee is $50. These fees are not included in the Cost Estimate.

Task 1C Deliverables:
♦ Electronic submittal of the Administrative Final IS/MND and MMRP ♦ Five (5) bound copies and one (1) electronic copy of the Final IS/MND and MMRP ♦ Notice of Determination
Task 2 – Technical Studies
Task 2A – Air Quality and Greenhouse Gas Emissions Assessment The assessment of air quality and greenhouse gas (GHG) emissions will quantify short-term and long-term emissions generated by the proposed improvements associated with the Homme-Adams Park and Randell Henderson Trailhead. ECORP will employ the most up-to-date version of the California Emissions Estimator Model (CalEEMod). CalEEMod is a statewide land use emissions computer model designed to quantify pollutant emissions associated with construction and operations from a variety of land use projects. To the extent available, construction-related emissions modeling will be based on Project-specific information provided by the Project proponent (e.g., construction schedules, activities, and equipment to be used). Project criteria air pollutant emissions will be compared to the thresholds of significance promulgated by the South Coast Air Quality Management District (SCAQMD), including SCAQMD’s recommended Localized Significance Thresholds (LSTs). LSTs were developed in response to SCAQMD Governing Boards' Environmental Justice Enhancement Initiative (I-4). Additional CEQA Guidelines Appendix G thresholds will also be evaluated, including the potential for the Proposed Project to expose sensitive receptors to substantial pollutant concentrations, to cause objectionable odors, or to impede attainment of the current SCAQMD Air Quality Management Plan. Project GHG emissions will be assessed against the SCAQMD numeric bright‐line threshold of 3,000 metric tons of CO2e annually.

ECORP proposes to evaluate potential air quality and GHG-related impacts in a technical report.

Where appropriate, the analysis would be supported by modeling documentation, which would be included as an appendix to the technical report. ECORP will complete the Air Quality and Greenhouse Gas Emissions Assessment within 3 to 6 weeks of receiving a notice-to-proceed and all needed documentation, such as a project description, site plan, and traffic study if prepared. 752
2024-RFP-26 Park and Trailhead Engineering and Design – ECORP Consulting, Inc. Bid (P25-108) Task 2A Deliverables:
♦ One (1) electronic version of the Air Quality and Greenhouse Gas Emissions Assessment Technical Report.

Task 2B – Energy Consumption Assessment
ECORP proposes to analyze Project energy consumption in a technical report where potential impacts related to Project energy consumption will be assessed against the Office of Planning and Research’s proposed standards of significance: i.e., whether the Project result in the wasteful, inefficient, or unnecessary consumption of energy, or wasteful use of energy resources; and, whether the Project would conflict with an applicable plan for renewable energy or energy efficiency. There are no established thresholds of significance, statewide or locally, for what constitutes a wasteful, inefficient, and unnecessary consumption of energy for proposed park/trailhead improvements.

Therefore, for the purposes of this analysis, the amount of energy necessary for Project construction and post-construction operations will be quantified and compared to that consumed in Riverside County as a whole. Where appropriate, the analysis would be supported by modeling documentation, which would be included as an appendix to the report. ECORP will complete the Energy Consumption Assessment within 3 to 6 weeks of receiving a notice-to-proceed and all needed documentation, such as a project description, site plan, and traffic study if prepared.

Task 2B Deliverables:
♦ One (1) electronic version of the Energy Consumption Assessment Technical Report.

Task 2C – Noise Impact Analysis
The evaluation of noise impacts associated with the Project will be completed by staff members who are noise experts. The applicable noise and land use compatibility criteria for the Project Area will be discussed as they will be the basis for the Project impact determination and whether mitigation is necessary. Since the Project is proposing improvements to existing recreational facilities and postconstruction operations would not result in a wholly new land use, an onsite baseline noise survey is not proposed. Instead, the American National Standards Institute (ANSI) Standard “Quantities and Procedures for Description and Measurement of Environmental Sound – Part 3”, which provides a table of approximate background sound levels based on land use and population density, will be referenced in order to provide a representative characterization of the existing ambient noise environment. Additionally, Figure 7.1 of the City General Plan Noise Chapter, which identifies traffic noise contours throughout the City, will be referenced. The combination of the ANSI Standard reference and City General Plan will provide a representative characterization of the existing ambient noise environment.

Construction would occur during implementation of the Proposed Project. Noise levels from construction sources will be analyzed using the Federal Highway Administration Roadway 753
2024-RFP-26 Park and Trailhead Engineering and Design – ECORP Consulting, Inc. Bid (P25-108) Construction Noise Model, based on the anticipated equipment to be used. In order to evaluate the potential health-related effects (physical damage to the ear) from construction noise, construction noise will be evaluated in terms of hourly equivalent continuous noise levels (Leq) and the frequency of occurrence at nearby land uses of each of the Project sites. In addition to construction noise, an analysis of vibration impacts will be prepared based on the California Department of Transportation’s vibration analysis guidance.

The evaluation of the Project’s contribution to noise increases over existing conditions will be addressed. Project implementation would result in additional non-transportation noise sources.

Project onsite noise is anticipated to largely be the same as generated under existing conditions. The analysis of onsite noise will quantify predicted noise levels using standard equations and calculation protocols. Another source of noise associated with the Project would be offsite automobile traffic.

According to the 2020 Caltrans Technical Noise Supplement to the Traffic Noise Analysis Protocol, doubling of traffic on a roadway is required in order to increase noise to a perceptible level for humans. In the case that traffic is predicted to double the amount of existing traffic on vicinity roadways, offsite mobile source noise from vehicular traffic will be quantified using the U.S. Federal Highway Traffic Noise Prediction Model (FHWA-RD-77-108). Otherwise, offsite traffic noise will be addressed qualitatively.

ECORP proposes to evaluate potential noise-related impacts in a technical report. The analysis will be supported by modeling documentation, which would be included as an appendix to the report.

ECORP will complete the Noise Impact Assessment within 3 to 6 weeks of receiving a notice-toproceed and all needed documentation, such as a project description, site plan, and traffic study if prepared.

Task 2C Deliverables:
♦ One (1) electronic version of the Noise Impact Assessment Technical Report.

Task 2D – Biological Resources Assessment Report
ECORP will conduct background research to help characterize the current conditions within the Project site. The research will entail a search of public databases, such as the CDFW California Natural Diversity Database (CNDDB), the California Native Plant Society’s (CNPS) online Inventory of Rare and Endangered Plants of California (Inventory), the National Wetland Inventory (NWI), the U.S. Fish and Wildlife Service’s (USFWS) Critical Habitat Portal, CDFW Biogeographical Information Observation System (BIOS), and the Natural Resources Conservation Service’s (NRCS) online Web Soil Survey.

Because the property is located within the Coachella Valley Multiple Species Habitat Conservation Plan (CVMSHCP) area, ECORP will research the plan to determine requirements for surveys, avoidance of specific habitat types, and other measures. These stipulations will be discussed, and any required measures (if applicable) will be incorporated into the report. 754
2024-RFP-26 Park and Trailhead Engineering and Design – ECORP Consulting, Inc. Bid (P25-108) To characterize the biological resources on the property, ECORP biologists will conduct a field visit to the Project site. This field reconnaissance will be conducted on foot, and at a time of day that is conducive to making wildlife observations. Using aerial photography, the biologists will verify the current vegetation communities and habitats on the Project site. The biologists will generate a list of plant and wildlife species observed during the reconnaissance of the site, and record existing biological conditions, including observations of sensitive species, using Global Positioning System (GPS) technology, field notes, and digital photography.

Following the completion of the biological reconnaissance survey, ECORP will prepare a report that includes descriptions of the Project site location and Project description, existing biological conditions, survey methods, results of the background research and site reconnaissance, and locations and descriptions of sensitive species observed or detected. The report will also contain site photographs; location and vegetation map exhibits; descriptions of existing anthropogenic influences and disturbances; sensitive species habitat and locations map exhibit; field notes and data sheets; and a list of references. The report will provide information about the plant and wildlife communities on and adjacent to the Project site that could be affected by Project activities. If any focused surveys for sensitive resources are determined necessary following this biological assessment, recommendations for those surveys will be included in the report.

Task 2D Deliverables:
♦ Draft Biological Resources Assessment Report in PDF format. ♦ Final Biological Resources Assessment Report in PDF format.

Task 2E – Cultural Resources Inventory Report
ECORP will conduct a cultural resources inventory of the study area, located in the City of Palm Desert. All work will be conducted by, or under the direct supervision of, a Registered Professional Archaeologist, who meets the Secretary of the Interior's Professional Qualifications Standards for prehistoric and historical archaeology.

This scope of work includes a records search with the California Historical Resources Information System (CHRIS) of the California Office of Historic Preservation at the South Coastal Information Center (SCIC), which includes a review of the state archaeological site files, the National Register of Historic Places, and other databases that catalogue significant events and resources in local, state, or national history. Information will be obtained on previously recorded archaeological sites and cultural resource management studies in and within 1 mile of the project area. ECORP will also contact the Native American Heritage Commission to request a sacred lands file search to determine whether any sacred sites have been recorded on the property. Additionally, ECORP will contact local historical societies, if any, to seek additional information on the location of the Project Area.

ECORP will complete an intensive field survey of the entire Project Area. The exact acreage of the Project Area has yet to be determined, therefore ECORP assumes the final acreage will not exceed 25 755
2024-RFP-26 Park and Trailhead Engineering and Design – ECORP Consulting, Inc. Bid (P25-108) acres. ECORP will survey all accessible portions of the Project Area using pedestrian transect intervals spaced 10 to 15 meters apart, where possible. The Project Area will be examined for evidence of cultural resources, including pre-contact and historic-period (i.e., over 50 years of age) cultural deposits and features. If any resources are identified in the Project Area, they must be recorded and mapped in accordance with the standards of the California Office of Historic Preservation (OHP); however, for costing purposes, ECORP assumes that no cultural resources will need to be recorded. A separate scope and cost will be prepared for any recording of resources and evaluation of eligibility to be included in the California Register of Historical Resources (CRHR) or the National Register of Historic Places (NRHP) based on the level of effort required.

ECORP will prepare an inventory report that follows the California Office of Historic Preservation’s recommended content and format. The report will provide the historic context, methods, results, and recommendations for appropriate findings. ECORP will respond to one round of non-conflicting comments and prepare a finalized copy of the report.

Task 2E Deliverables:
♦ Draft Cultural Resources Inventory Report in PDF format. ♦ Final Cultural Resources Inventory Report in PDF format.

Task 2F – AB 52 Consultation Assistance
ECORP will assist the City of Palm Desert in consulting with California Native American tribes under Assembly Bill 52 (AB 52). At the direction and discretion of the City, ECORP may use this budget to assist in drafting consultation letters, coordinate tribal meetings, maintain the AB 52 administrative record, author CEQA sections, and provide technical support to the agency in determining whether or not Tribal Cultural Resources will be significantly impacted by the project.

This cost estimate is provided on a time and materials basis. If the consultation requests from the tribes or services requested from the City will require more effort that will exceed the budget provided herein, then a contract change order would be required to complete the scope and AB 52 consultation.

Task 2F Deliverables:
♦ Draft AB 52 notification, consultation initiation, consultation conclusion letters, and correspondence log.
756
2024-RFP-26 Park and Trailhead Engineering and Design – ECORP Consulting, Inc. Bid (P25-108) Task 2G – Paleontological Resources Memo
ECORP will conduct a paleontological record search through Western Science Center (WSC), Hemet, CA. The record search results will detail the project site’s sensitivity to producing paleontological resources as well as any recorded paleontological resources from within the Project area and from within a 1-mile radius. In addition to the record search, a detailed desktop literature review will be conducted on the paleontology of the project area. Information about previous surveys and previously recorded paleontological resources will be obtained for the project area.

A qualified paleontologist will review the results of the record search obtained from the WSC. Based on the observations and recommendations outlined in the search, a paleontological resources assessment report will be drafted discussing the geologic units found within the Project site and within a 1-mile radius, particularly those units that are sensitive to producing paleontological resources. In addition, a list of paleontological resources that have been documented and curated at the museum from the Project site area and vicinity will be listed. Finally, if there is a likelihood of encountering paleontological resources during project construction, the letter report will recommend mitigation measures to follow during construction activities.

Task 2G Deliverables:
♦ Electronic copy of the Final Paleontological Resources Memo Task 2H – Traffic Study
As a subconsultant to ECORP, KOA will prepare a Traffic Study Technical Memorandum for the Project site. This study will include both a Trip Generation Analysis and a VMT Screening Assessment in support of the environmental studies. During coordination, information will be requested from the Client including but not limited to the project description, site plan, and any data, analyses, documents or other information available that is relevant to the proposed project and surrounding project area.

It is envisioned that communication with the Client, project team, and City staff will be primarily through email and short conference calls. If attendance of in-person meetings is requested by the Client, KOA can attend in-person meetings for an additional fee on a per-meeting basis as described in the Cost Estimate section below.

KOA will follow the guidelines of the City of Palm Desert Transportation Analysis Guidelines for Level of Service/Vehicle Miles Traveled (December 2020; adopted August 2022; the “City’s TA Guidelines”).

The trip generation analysis will include a Project Description and a summary of the anticipated project trip generation, based on the size of the project site and per the latest ITE. If trip rates from ITE Trip Generation Manual are not available based on the project description of the trailhead, then the trip generation will be estimated based on the proposed parking provisions. 757
2024-RFP-26 Park and Trailhead Engineering and Design – ECORP Consulting, Inc. Bid (P25-108) Per the City’s TA Guidelines, the following screening criteria are used to determine when a project is required to prepare a full VMT analysis. A development project meeting any of the screening criteria listed below can be assumed to have a less than-significant VMT impact and does not require additional VMT analysis:

1. Small Project

2. High-Quality Transit Area (HQTA)

3. Local-Serving Retail

4. Affordable Housing

5. Local Essential Service

6. Map-Based Screening (maps provided in the City’s TA Guidelines)

7. Redevelopment Projects
Under criteria 5, Local Essential Service, the TA Guidelines include “Local or Community Parks”.

Therefore, Homme-Adams Park is likely to screen out as a park. Using the City of Palm Desert Transportation Analysis Guidelines for Level of Service/Vehicle Miles Traveled, and the trip generation estimates developed as part of Task 2, KOA will conduct a VMT screening analysis for the project to determine whether additional VMT analysis is required.

The Traffic Study including the Trip Generation Analysis and VMT Screening Assessment for the Randall Henderson Trailhead Project will be documented in a Technical Memorandum for submission to the Client for review. The Traffic Study will be updated, if necessary, based on up to one round of comments from the Client.

KOA will prepare a Final Technical Memorandum based on up to one round of comments from the City of Palm Desert, if necessary.

Task 2H Deliverables:
♦ Electronic copy of the Internal Draft Traffic Study Technical Memorandum ♦ Electronic copy of the Draft Traffic Study Technical Memorandum ♦ Electronic copy of the Final Traffic Study Technical Memorandum Task 3 – Meetings
ECORP’s Project Manager and other technical staff will be able to attend up to three project meetings with Architerra and the City via phone or online platform. Approximately 8 hours of time has been budgeted for meetings. If attendance of in-person meetings is requested by the Client, ECORP can attend inperson meetings for an additional fee on a per-meeting basis as described in the Cost Estimate section below.
758
2024-RFP-26 Park and Trailhead Engineering and Design – ECORP Consulting, Inc. Bid (P25-108) Randal Henderson Trailhead
Task 1 – CEQA Initial Study/Mitigated Negative Declaration Task 1A – Administrative Draft IS/MND
An IS/MND will be prepared using the approved checklist format from the City of Palm Desert or Appendix G of the current CEQA Guidelines. ECORP will prepare a brief description of the environmental setting; an identification of environmental effects using the above-referenced checklist format, a brief substantiation of the checklist entries, and a list of references and preparers.

A land use and planning consistency analysis will be conducted by ECORP as part of the IS/MND.

ECORP will also analyze potential utility and service system impacts of the proposed project.

Record/database searches for hazards/hazardous materials will also be conducted. ECORP will provide mitigation measures (if required) that can be developed using existing data.

Task 1A Assumptions:
♦ We have assumed we will receive copies of any previously prepared technical reports, plans, and other Project information from the City, including electronic versions, to the extent possible. ♦ According to the RFP, federal funding may be utilized based on the availability and successful application for grant programs. If federal funding is obtained for the Project, compliance with the National Environmental Policy Act (NEPA) would be required. If these services are requested by the City, ECORP would provide a contract change order.

Task 1A Deliverables:
♦ An electronic copy of the Administrative Draft IS/MND will be submitted to the City via email for review and comment
Task 1B – Prepare and Distribute Draft IS/MND and Notices After receipt of one (1) set of integrated comments on the Administrative Draft IS/MND from the City, we will revise the IS/MND accordingly. ECORP will provide five (5) bound copies and one (1) electronic copy of the environmental document to the City for internal use. ECORP will mail twenty (20) hard copies of the Notice of Intent (NOI) document to addressees on the mailing list, which will include the City website where the environmental documentation and notices for the Project can be viewed online. ECORP will electronically file the environmental document and corresponding notices with the State Clearinghouse and provide an electronic copy to the City for their website. We have assumed that the City and ECORP will work together to assemble the mailing list. ECORP will prepare the following notices as required by CEQA:
♦ Notice of Intent (NOI) to Adopt a Mitigated Negative Declaration ♦ Notice of Completion (State Clearinghouse Cover)
759
2024-RFP-26 Park and Trailhead Engineering and Design – ECORP Consulting, Inc. Bid (P25-108) ♦ Environmental Summary Form (for the State Clearinghouse) ECORP will prepare, publish, file, and distribute a Notice of Intent (NOI) to Adopt a Mitigated Negative Declaration. One copy of each of these notices will be filed with the Los Angeles County Clerk and the State Clearinghouse. ECORP will also distribute the NOI to responsible and trustee agencies as well as other interested parties. One electronic copy of each notice will be provided to the City. The NOI is required by CEQA to be either posted on-site, mailed to the surrounding property owners, or published in a newspaper of general circulation. For costing purposes, it has been assumed that ECORP will arrange for the NOI to be published in a newspaper of general circulation. Newspaper fees are included in the cost estimate.

Task 1B Deliverables:
♦ Five (5) bound copies and one (1) electronic copy of the Draft IS/MND for City use ♦ Twenty (20) hard copies of the Notice of Intent (NOI) document ♦ Notice of Intent, Notice of Completion, and Environmental Summary Form ♦ Newspaper ad for NOI
♦ Additional copies will be billed on a time-and-materials basis Task 1C – Final IS/MND, MMRP, and Notice of Determination The Lead Agency (City) must consider any comments received on the MND when making a decision on the Project. For costing, we have assumed that ten (10) comment letters containing three (3) comments each will be received (or a total of 30 comments). ECORP will collate all public comments and comment letters regarding the Initial Study and prepare written responses to comments for City review. It is assumed that City staff will receive all comments and will forward to ECORP as soon as possible after receipt.

The Final IS/MND will include responses to comments received on the Draft IS/MND, any changes to the Draft IS/MND, and the Mitigation Monitoring and Reporting Program (MMRP, if required) prepared in accordance with CEQA Guidelines Section 15097. ECORP will prepare the MMRP in table format, with input from the City. An Administrative Final IS/MND and MMRP will be prepared, and after review by the City, the Final IS/MND and MMRP will be provided.

ECORP will prepare a Notice of Determination (NOD) as required by CEQA. A copy of the NOD will be filed with the Riverside County Clerk and the State Clearinghouse, as appropriate, within five business days of adoption of the IS/MND. An electronic copy of the NOD will be provided to the City. It has been assumed that the City will pay any fees associated with the NOD. The CDFW filing fee for an MND is $2,968.75. The County Clerk filing fee is $50. These fees are not included in the Cost Estimate.
760
2024-RFP-26 Park and Trailhead Engineering and Design – ECORP Consulting, Inc. Bid (P25-108) Task 1C Deliverables:
♦ Electronic submittal of the Administrative Final IS/MND and MMRP ♦ Five (5) bound copies and one (1) electronic copy of the Final IS/MND and MMRP ♦ Notice of Determination
Task 2 – Technical Studies
Task 2A – Air Quality and Greenhouse Gas Emissions Assessment The assessment of air quality and greenhouse gas (GHG) emissions will quantify short-term and long-term emissions generated by the proposed improvements associated with the Homme-Adams Park and Randell Henderson Trailhead. ECORP will employ the most up-to-date version of the California Emissions Estimator Model (CalEEMod). CalEEMod is a statewide land use emissions computer model designed to quantify pollutant emissions associated with construction and operations from a variety of land use projects. To the extent available, construction-related emissions modeling will be based on Project-specific information provided by the Project proponent (e.g., construction schedules, activities, and equipment to be used). Project criteria air pollutant emissions will be compared to the thresholds of significance promulgated by the South Coast Air Quality Management District (SCAQMD), including SCAQMD’s recommended Localized Significance Thresholds (LSTs). LSTs were developed in response to SCAQMD Governing Boards' Environmental Justice Enhancement Initiative (I-4). Additional CEQA Guidelines Appendix G thresholds will also be evaluated, including the potential for the Proposed Project to expose sensitive receptors to substantial pollutant concentrations, to cause objectionable odors, or to impede attainment of the current SCAQMD Air Quality Management Plan. Project GHG emissions will be assessed against the SCAQMD numeric bright‐line threshold of 3,000 metric tons of CO2e annually.

ECORP proposes to evaluate potential air quality and GHG-related impacts in a technical report.

Where appropriate, the analysis would be supported by modeling documentation, which would be included as an appendix to the technical report. ECORP will complete the Air Quality and Greenhouse Gas Emissions Assessment within 3 to 6 weeks of receiving a notice-to-proceed and all needed documentation, such as a project description, site plan, and traffic study if prepared.

Task 2C Deliverables:
♦ One (1) electronic version of the Air Quality and Greenhouse Gas Emissions Assessment Technical Report.

Task 2B – Energy Consumption Assessment
ECORP proposes to analyze Project energy consumption in a technical report where potential impacts related to Project energy consumption will be assessed against the Office of Planning and 761
2024-RFP-26 Park and Trailhead Engineering and Design – ECORP Consulting, Inc. Bid (P25-108) Research’s proposed standards of significance: i.e., whether the Project result in the wasteful, inefficient, or unnecessary consumption of energy, or wasteful use of energy resources; and, whether the Project would conflict with an applicable plan for renewable energy or energy efficiency. There are no established thresholds of significance, statewide or locally, for what constitutes a wasteful, inefficient, and unnecessary consumption of energy for proposed park/trailhead improvements.

Therefore, for the purposes of this analysis, the amount of energy necessary for Project construction and post-construction operations will be quantified and compared to that consumed in Riverside County as a whole. Where appropriate, the analysis would be supported by modeling documentation, which would be included as an appendix to the report. ECORP will complete the Energy Consumption Assessment within 3 to 6 weeks of receiving a notice-to-proceed and all needed documentation, such as a project description, site plan, and traffic study if prepared.

Task 2B Deliverables:
♦ One (1) electronic version of the Energy Consumption Assessment Technical Report.

Task 2C – Noise Impact Analysis
The evaluation of noise impacts associated with the Project will be completed by staff members who are noise experts. The applicable noise and land use compatibility criteria for the Project Area will be discussed as they will be the basis for the Project impact determination and whether mitigation is necessary. Since the Project is proposing improvements to existing recreational facilities and postconstruction operations would not result in a wholly new land use, an onsite baseline noise survey is not proposed. Instead, the American National Standards Institute (ANSI) Standard “Quantities and Procedures for Description and Measurement of Environmental Sound – Part 3”, which provides a table of approximate background sound levels based on land use and population density, will be referenced in order to provide a representative characterization of the existing ambient noise environment. Additionally, Figure 7.1 of the City General Plan Noise Chapter, which identifies traffic noise contours throughout the City, will be referenced. The combination of the ANSI Standard reference and City General Plan will provide a representative characterization of the existing ambient noise environment.

Construction would occur during implementation of the Proposed Project. Noise levels from construction sources will be analyzed using the Federal Highway Administration Roadway Construction Noise Model, based on the anticipated equipment to be used. In order to evaluate the potential health-related effects (physical damage to the ear) from construction noise, construction noise will be evaluated in terms of hourly equivalent continuous noise levels (Leq) and the frequency of occurrence at nearby land uses of each of the Project sites. In addition to construction noise, an analysis of vibration impacts will be prepared based on the California Department of Transportation’s vibration analysis guidance.
762
2024-RFP-26 Park and Trailhead Engineering and Design – ECORP Consulting, Inc. Bid (P25-108) The evaluation of the Project’s contribution to noise increases over existing conditions will be addressed. Project implementation would result in additional non-transportation noise sources.

Project onsite noise is anticipated to largely be the same as generated under existing conditions. The analysis of onsite noise will quantify predicted noise levels using standard equations and calculation protocols. Another source of noise associated with the Project would be offsite automobile traffic.

According to the 2020 Caltrans Technical Noise Supplement to the Traffic Noise Analysis Protocol, doubling of traffic on a roadway is required in order to increase noise to a perceptible level for humans. In the case that traffic is predicted to double the amount of existing traffic on vicinity roadways, offsite mobile source noise from vehicular traffic will be quantified using the U.S. Federal Highway Traffic Noise Prediction Model (FHWA-RD-77-108). Otherwise, offsite traffic noise will be addressed qualitatively.

ECORP proposes to evaluate potential noise-related impacts in a technical report. The analysis will be supported by modeling documentation, which would be included as an appendix to the report.

ECORP will complete the Noise Impact Assessment within 3 to 6 weeks of receiving a notice-toproceed and all needed documentation, such as a project description, site plan, and traffic study if prepared.

Task 2C Deliverables:
♦ One (1) electronic version of the Noise Impact Assessment Technical Report.

Task 2D – Biological Resources Assessment Report
A biological resources data base search will be conducted for the project area using public data bases including the Coachella Valley Multiple Species Habitat Conservation Plan (CVMSHCP) website, California Natural Diversity Data Base, and the California Native Plant Society online data base. The search will identify the approximate locations of known or expected sensitive biological resources and habitats located within or near the project areas. ECORP conducted work on several projects in and near the Project Area, including for the CV Link construction, and will use knowledge gained from those projects as well. Also, any existing studies for the area made available to ECORP by the City of Coachella will be reviewed.

ECORP will analyze the Project within the context of the CVMSHCP. The CVMSHCP protects natural habitat, plants and animals within the Coachella Valley and also identifies conservation goals for projects located within the plan area.

Once the data base search and analysis has been completed, ECORP will complete a field survey of the Project Area (a total of 4.7 acres). Biological resources that are known from or potentially occur on the property will be searched for in particular during the survey. Habitats and vegetation communities will be mapped. Representative photographs will be taken to document site conditions at the time of the survey.

A full list of plant and animal species will be recorded during the survey. If any sensitive biological 763
2024-RFP-26 Park and Trailhead Engineering and Design – ECORP Consulting, Inc. Bid (P25-108) resources are found within the project area, their location will be recorded and the resource will be discussed in the technical report.

A biological resources technical report will be prepared to document the methods and results of the data base search and field survey. The report will conform to the information needs for review under CEQA and will include a summary of the biological setting of the project area, brief project description, discussion of survey methods, and will describe the biological resources within the property in detail as well as the requirements of the CVMSHCP. The report will also present recommendations for further work, if needed, including focused surveys for sensitive species or jurisdictional delineations.

Task 2D Deliverables:
♦ Draft Biological Resources Assessment Report in PDF format. ♦ Final Biological Resources Assessment Report in PDF format.

Task 2E – Cultural Resources Inventory Report
ECORP will conduct a cultural resources inventory of the study area, located in the City of Palm Desert. All work will be conducted by, or under the direct supervision of, a Registered Professional Archaeologist, who meets the Secretary of the Interior's Professional Qualifications Standards for prehistoric and historical archaeology.

This scope of work includes a records search with the California Historical Resources Information System (CHRIS) of the California Office of Historic Preservation at the South Coastal Information Center (SCIC), which includes a review of the state archaeological site files, the National Register of Historic Places, and other databases that catalogue significant events and resources in local, state, or national history. Information will be obtained on previously recorded archaeological sites and cultural resource management studies in and within 1 mile of the project area. ECORP will also contact the Native American Heritage Commission to request a sacred lands file search to determine whether any sacred sites have been recorded on the property. Additionally, ECORP will contact local historical societies, if any, to seek additional information on the location of the Project Area.

ECORP will complete an intensive field survey of the entire Project Area. The exact acreage of the Project Area has yet to be determined, therefore ECORP assumes the final acreage will not exceed 25 acres. ECORP will survey all accessible portions of the Project Area using pedestrian transect intervals spaced 10 to 15 meters apart, where possible. The Project Area will be examined for evidence of cultural resources, including pre-contact and historic-period (i.e., over 50 years of age) cultural deposits and features. If any resources are identified in the Project Area, they must be recorded and mapped in accordance with the standards of the California Office of Historic Preservation (OHP); however, for costing purposes, ECORP assumes that no cultural resources will need to be recorded. A separate scope and cost will be prepared for any recording of resources and evaluation of eligibility to be included in the California Register of Historical Resources (CRHR) or the National Register of Historic Places (NRHP) based on the level of effort required. 764
2024-RFP-26 Park and Trailhead Engineering and Design – ECORP Consulting, Inc. Bid (P25-108) ECORP will prepare an inventory report that follows the California Office of Historic Preservation’s recommended content and format. The report will provide the historic context, methods, results, and recommendations for appropriate findings. ECORP will respond to one round of non-conflicting comments and prepare a finalized copy of the report.

Task 2E Deliverables:
♦ Draft Cultural Resources Inventory Report in PDF format. ♦ Final Cultural Resources Inventory Report in PDF format.

Task 2F – AB 52 Consultation Assistance
ECORP will assist the City of Palm Desert in consulting with California Native American tribes under Assembly Bill 52 (AB 52). At the direction and discretion of the City, ECORP may use this budget to assist in drafting consultation letters, coordinate tribal meetings, maintain the AB 52 administrative record, author CEQA sections, and provide technical support to the agency in determining whether or not Tribal Cultural Resources will be significantly impacted by the project.

This cost estimate is provided on a time and materials basis. If the consultation requests from the tribes or services requested from the City will require more effort that will exceed the budget provided herein, then a contract change order would be required to complete the scope and AB 52 consultation.

Task 2F Deliverables:
♦ Draft AB 52 notification, consultation initiation, consultation conclusion letters, and correspondence log.

Task 2G – Paleontological Resources Memo
ECORP will conduct a paleontological record search through Western Science Center (WSC), Hemet, CA. The record search results will detail the project site’s sensitivity to producing paleontological resources as well as any recorded paleontological resources from within the Project area and from within a 1-mile radius. In addition to the record search, a detailed desktop literature review will be conducted on the paleontology of the project area. Information about previous surveys and previously recorded paleontological resources will be obtained for the project area.

A qualified paleontologist will review the results of the record search obtained from the WSC. Based on the observations and recommendations outlined in the search, a paleontological resources assessment report will be drafted discussing the geologic units found within the Project site and within a 1-mile radius, particularly those units that are sensitive to producing paleontological resources. In addition, a list of paleontological resources that have been documented and curated at the museum from the Project site area and vicinity will be listed. Finally, if there is a likelihood of 765
2024-RFP-26 Park and Trailhead Engineering and Design – ECORP Consulting, Inc. Bid (P25-108) encountering paleontological resources during project construction, the letter report will recommend mitigation measures to follow during construction activities.

Task 2G Deliverables:
♦ Electronic copy of the Final Paleontological Resources Memo Task 2H – Traffic Study
As a subconsultant to ECORP, KOA will prepare a Traffic Study Technical Memorandum for the Project site. This study will include both a Trip Generation Analysis and a VMT Screening Assessment in support of the environmental studies. During coordination, information will be requested from the Client including but not limited to the project description, site plan, and any data, analyses, documents or other information available that is relevant to the proposed project and surrounding project area.

It is envisioned that communication with the Client, project team, and City staff will be primarily through email and short conference calls. If attendance of in-person meetings is requested by the Client, KOA can attend in-person meetings for an additional fee on a per-meeting basis as described in the Cost Estimate section below.

KOA will follow the guidelines of the City of Palm Desert Transportation Analysis Guidelines for Level of Service/Vehicle Miles Traveled (December 2020; adopted August 2022; the “City’s TA Guidelines”).

The trip generation analysis will include a Project Description and a summary of the anticipated project trip generation, based on the size of the project site and per the latest ITE. If trip rates from ITE Trip Generation Manual are not available based on the project description of the trailhead, then the trip generation will be estimated based on the proposed parking provisions.

Per the City’s TA Guidelines, the following screening criteria are used to determine when a project is required to prepare a full VMT analysis. A development project meeting any of the screening criteria listed below can be assumed to have a less than-significant VMT impact and does not require additional VMT analysis:

1. Small Project

2. High-Quality Transit Area (HQTA)

3. Local-Serving Retail

4. Affordable Housing

5. Local Essential Service

6. Map-Based Screening (maps provided in the City’s TA Guidelines)

7. Redevelopment Projects
766
2024-RFP-26 Park and Trailhead Engineering and Design – ECORP Consulting, Inc. Bid (P25-108) Under criteria 5, Local Essential Service, the TA Guidelines include “Local or Community Parks”.

Therefore, Randall Henderson Trailhead is likely to screen out as a park. Using the City of Palm Desert Transportation Analysis Guidelines for Level of Service/Vehicle Miles Traveled, and the trip generation estimates developed as part of Task 2, KOA will conduct a VMT screening analysis for the project to determine whether additional VMT analysis is required.

The Traffic Study including the Trip Generation Analysis and VMT Screening Assessment for the Randall Henderson Trailhead Project will be documented in a Technical Memorandum for submission to the Client for review. The Traffic Study will be updated, if necessary, based on up to one round of comments from the Client.

KOA will prepare a Final Technical Memorandum based on up to one round of comments from the City of Palm Desert, if necessary.

Task 2H Deliverables:
♦ Electronic copy of the Internal Draft Traffic Study Technical Memorandum ♦ Electronic copy of the Draft Traffic Study Technical Memorandum ♦ Electronic copy of the Final Traffic Study Technical Memorandum Task 3 – Meetings
ECORP’s Project Manager and other technical staff will be able to attend up to three project meetings with Architerra and the City via phone or online platform. Approximately 8 hours of time has been budgeted for meetings. If attendance of in-person meetings is requested by the Client, ECORP can attend inperson meetings for an additional fee on a per-meeting basis as described in the Cost Estimate section below.

3.0 SCHEDULE
ECORP is confident that we can meet the expected time frame of the completion of the IS/MND according to the schedule below, for each of the parks. The respective starting point is assumed to be different for each park, based on the results of public comment and the design schedule, but the time frame from that starting point should be very similar.

This schedule can be modified based on the needs of the Client or the City. We propose to prepare the Administrative Draft IS/MND concurrently with the technical studies to stay on schedule. AB 52 Native American consultation (if requested by one or more tribes) will need to be initiated prior to public circulation of the Draft IS/MND and the start of the 30-day public review period and consultation must be completed prior to the adoption of the Final IS/MND by the City Council. Please note that delays may occur as it pertains to acquiring cultural records search requests from the Eastern Information Center located at the University of California, Riverside campus. 767
2024-RFP-26 Park and Trailhead Engineering and Design – ECORP Consulting, Inc. Bid (P25-108) Tasks Time Frame for Completion
Task 1 CEQA Initial Study and Mitigated Negative Declaration Task 1A – Administrative Draft IS/MND 12 weeks from 60% design City Review 2 weeks
Task 1B – Prepare and Distribute Draft IS/MND and Notices 2 weeks from receipt of City/Client comments Public/Agency Review 30 calendar days
Task 1C – Final IS/MND, MMRP, and Notice of
Determination 3 weeks from end of public review period
City Review 2 weeks
Notice of Determination
Filed with the Riverside County Clerk and
State Clearinghouse within 5 business days of
MND adoption
Task 2 – Technical Studies
Task 2A – Air Quality and Greenhouse Gas Emissions
Assessment
8 weeks from 60% design
Task 2B – Energy Consumption Analysis 8 weeks from 60% design Task 2C – Noise Impact Analysis 8 weeks from 60% design Task 2D – Biological Resources Assessment Report 8 weeks from 60% design Task 2E – Cultural Resources Inventory Report 8 weeks from 60% design Task 2F – AB52 Consultation Assistance 8 weeks from 60% design Task 2G – Paleontological Resources Memorandum 8 weeks from 60% design Task 2H – Traffic Study 8 weeks from 60% design
Task 3 Meetings
Notes: 1Please note that delays may occur as it pertains to acquiring cultural records search requests from the EIC. As a result, the schedule of completion of work under this task may be affected. ECORP will keep the Client apprised of any schedule implications as they become known, but will not be held responsible for delays to the project as a result of Information Center closures or delays.

4.0 COST ESTIMATE
ECORP will complete the above scope of work on a time-and-materials basis. Our costs are detailed below. Each park is costed separately, though the costs are very similar. If requested by the Client, one senior-level or higher staff from ECORP will attend in-person meetings with the Client, project team and/or Palm Desert staff at $250 per hour, or public hearings (e.g., evening/night-time council or planning commission meetings) for a minimum of $1,000 extra per meeting. ($250 per hour with a four-hour minimum for evening/night-time meetings). See accompanying rate sheet for further rate information.

Homme-Adams Park Cost
Task 1 - CEQA Initial Study and Mitigated Negative Declaration Task 1A – Administrative Draft IS/MND $18,485
Task 1B – Prepare and Distribute Draft IS/MND and Notices $7,920 Task 1C – Final IS/MND, MMRP, and Notice of Determination (includes $2,764 CDFW filing fee) $12,205
768
2024-RFP-26 Park and Trailhead Engineering and Design – ECORP Consulting, Inc. Bid (P25-108) Homme-Adams Park Cost
Task 2 - Technical Studies
Task 2A – Air Quality and Greenhouse Gas Emissions Analysis $6,050 Task 2B – Energy Consumption Analysis $3,000
Task 2C – Noise Impact Analysis $5,800
Task 2D – Biological Resources Assessment Report $12,500 Task 2E – Cultural Resources Inventory Report $13,350
Task 2F – AB52 Consultation Assistance $5,000
Task 2G – Paleontological Resources Memorandum $5,000
Task 2H – Traffic Study $6,082
Task 3 – Meetings $4,400
Homme-Adams Park Total $99,792
Randall Henderson Trailhead Cost
Task 1 - CEQA Initial Study and Mitigated Negative Declaration Task 1A – Administrative Draft IS/MND $18,485
Task 1B – Prepare and Distribute Draft IS/MND and Notices $7,920 Task 1C – Final IS/MND, MMRP, and Notice of Determination (includes $2,764 CDFW filing fee) $12,205
Task 2 - Technical Studies
Task 2A – Air Quality and Greenhouse Gas Emissions Analysis $6,050 Task 2B – Energy Consumption Analysis $3,000
Task 2C – Noise Impact Analysis $5,800
Task 2D – Biological Resources Assessment Report $12,500 Task 2E – Cultural Resources Inventory Report $13,350
Task 2F – AB52 Consultation Assistance $5,000
Task 2G – Paleontological Resources Memorandum $5,000
Task 2H – Traffic Study $6,082
Task 3 – Meetings $4,400
Randall Henderson Trailhead Total $99,792
GRAND TOTAL (Both Parks) $199,584

4.1 Bidding Assumptions
• ECORP will assume the plans, CAD files, Shape files and other materials depicting Project site boundaries, as available, will be provided to ECORP upon NTP • ECORP Consulting, Inc., assumes that contracting would be set up at the time of award or shortly afterwards.
769
2024-RFP-26 Park and Trailhead Engineering and Design – ECORP Consulting, Inc. Bid (P25-108) • NTP would entail provision of full access to the properties needing access and such access will be provided by the Client, including keys to locked gates and advance notice to existing property tenants of our right of entry.
• It is assumed that ECORP Consulting, Inc., can use and rely on the data and information contained in the project related documents provided by the Client. ECORP Consulting, Inc., will not perform a technical review of these documents, and will not be responsible for the content or accuracy of these studies.
• This scope and cost is subject to change due to changes in schedule or work description. Change orders will be issued and signed by the Client and ECORP Consulting, Inc., before starting additional work not provided for in the original proposal. • This cost is valid for a period of 60 days from the date of this the proposal. Beyond 60 days, ECORP Consulting, Inc., reserves the right to reevaluate the cost. • Expert Witness Testimony, including Depositions, is billed on a time-and-materials basis at time and a half.
• Schedule estimates are based on our best judgment of the requirements known at the time of the proposal and can be influenced favorably or adversely by Client needs and other circumstances.

ECORP will perform the services and accomplish the objectives within the presented costs and schedule. However, if the scope of work or schedule changes, ECORP will offer separate proposals for any out-of-scope work.
• ECORP shall not be held responsible for work delays or cancellations caused by strikes, accidents, acts of God, delays imposed by the Client, the COVID-19 pandemic, or other delays beyond the control of ECORP.
• It is assumed that ECORP can use and rely on the data and information contained in the Project related documents provided by the Client. ECORP will not perform a technical review of these documents, and will not be responsible for the content or accuracy of these studies. • ECORP Consulting, Inc. has not been delegated authority under applicable state or federal law to carry out government-to-government consultation with Native American tribes. We have assumed that the City will conduct all Native American consultation and will provide the results of consultation to ECORP for use in the Tribal Cultural Resources section of the IS/MND. • This scope does not include costs for consultation with the State Historic Preservation Office. • This scope does not include participation by tribal monitors in fieldwork. • Additional Project meetings and hard copies of reports, and other tasks not specified above will require a contract change order.
• ECORP Consulting, Inc. has assumed one round of integrated comments on each deliverable and that the project design will not change significantly after analysis is initiated. Additional rounds of comments and/or changes to project design may affect the cost and schedule. 770
2024-RFP-26 Park and Trailhead Engineering and Design – ECORP Consulting, Inc. Bid (P25-108) • Cultural resources location information is exempt from the California Public Records Act and Freedom of Information Act, and therefore, reports that include site location information are considered confidential and are not intended for public distribution. • For costing purposes, ECORP assumes that one cultural resource, consisting of the two transmission lines, will be encountered during the field survey. A separate scope and cost will be prepared for recording of any additional resources and evaluation of eligibility to be included in the California Register of Historical Resources (CRHR) or the National Register of Historic Places (NRHP) based on the level of effort required.

Costing/Global Assumptions
If you have any questions about the information presented in this letter, please contact me at [email protected] or (909) 677-6208.

Sincerely,
ECORP CONSULTING, Inc.

Scott Taylor
Senior Biologist/Regulatory Permitting Manager
771
Santa Ana + Pleasanton + San Diego + Davis + Honolulu SVA Architects, Inc. 6 Hutton Centre Drive, Suite 1150
Santa Ana, California 92707
T 949.809.3380
www.sva-architects.com
March 18, 2025
Mr. Drew Krumwiede | PLA
Principal | Director of Business and Marketing
Architerra Design Group
10221-A Trademark Street
Rancho Cucamonga, CA 91730
Re: Palm Desert RFQ 2024-RFP-156 Park and Trailhead Engineering and Design – Design and DSA Services Dear Drew:

SVA Architects, Inc. (SVA) appreciates this opportunity to submit our proposal to Architerra Design Group (ADG) for your review. This is based on our understanding of the work to be performed for the various project sites but, in particular, Washington Charter School located at 45-768 Portola Avenue, Palm Desert, CA 92260.

I. Project Background
The City of Palm Desert (City) is seeking to partner with multiple engineering and design firms to design and provide construction support for multiple parks and trailheads. Project sites include Hovley Soccer Park, Homme Adams Park, University Park, Washington Charter, Randall Henderson Trailhead, Freedom Park, and Ironwood Park. Key design needs include sport fields, landscape, playground, parking, shade structure, restroom, etc.

II. Scope of Services
Relevant to SVA’s services, some of the projects will involve new or modernized buildings but the exact scope is yet to be determined. One project site – Washington Charter School – will likely require DSA review and approval and SVA will support that processing effort.

With the limited information at this stage, we are assuming no design work or drawings from SVA at this time. Our scope is limited to the coordination of the DSA application and submittal efforts. We will submit ADG’s drawings and provide coordination during the review/approval process and project close out.

III. Compensation
A. With the limited project details, SVA proposes to provide our DSA support services for a fee of Seven Thousand Dollars ($7,000.00). We estimated roughly 40 hours of efforts at this time. If the effort exceeds the time required significantly (over 20%), we can further discuss additional scope. 772
Architerra Design Group
Palm Desert RFQ 2024-RFP-156 Park and Trailhead Engineering and Design Design and DSA Services
March 18, 2025

Page 2 ends

B. This fee excludes any design work from SVA, but we can provide such services when the scope is defined.

C. Reimbursement for any direct expenses will be at 1.10 of the cost. Reimbursable expenses will include, but not be limited to, printing and deliveries.

D. Payment to SVA will be made monthly in the proportion to services performed.

E. Any additionally requested or supplemental services would be performed at the hourly requested rates as follows:
• Partner/Principal $225
• Senior Project Manager/Architect $195
• Project Manager/Architect $175
• Job Captain $155
• Intermediate Technical Designer $125
• Junior Technical Designer $100
• Administrative Staff $75
We appreciate this opportunity to submit on this proposal. If you have any questions, please do not hesitate to reach out to us.

Sincerely,
SVA Architects, Inc.

Robert M. Simons, AIA
President & Partner
License No.: C18301
773
a
californiawaters.com 949.528.0900
we bring water to life

SPLASH PAD

AQUATIC ENGINEERING
& CONSULTANT

SERVICES PROPOSAL

3.10.25 IRONWOOD PARK

PALM DESERT
774

QUALIFICATIONS SUMMARY

QUALIFICATIONS
For over 20 years California Waters has been bringing water to life for our clients and end users.

Design & Engineering
Capitalizing on an in-house design and engineering team, our splash pad, swimming pool and water feature projects are designed in a way that they can be built with no surprises allowing your project to stay on time and on budget. And our expertise in value engineering maximizes your project’s budget without sacrificing your vision. Not only does this minimize change orders, but because we also have an in-house service division, our slash pads, pools and water features are designed based on what we know works in the field long after the project has been turned over.
• Complete turn-key design/engineering
• Structural Engineering
• Permitting
• Construction Administration
Construction
Using innovative techniques and our deep experience, we identify ways to increase construction efficiencies, adhere to budgets, accelerate schedules and eliminate surprises. Count on us to deliver quality and execute commercial pool and water feature design and construction on all fronts.

The California Waters' Advantage:
• We offer the experience and knowledge base required to design and build larger, more complex projects
• As a contractor, our designs are developed with an insider's understanding of material and equipment costs
• Our in-house designers provide architectural service assistance and guidance throughout the design process to both enhance the project and eliminate costly surprises on a specialized area with multiple code restrictions • We identify VE options upfront that maintain the project vision and integrity and focus on decreasing the budget
• All design/engineering services are provided in-house allowing us to control the schedule
• Permitting: Having taken multiple complex projects through plan check in counties throughout California- we have excellent relations with numerous City Planning and County Health Departments

ADDRESS
23311 E. La Palma Avenue
Yorba Linda, CA 92887
(949) 528-0900
www.californiawaters.com

POINT OF CONTACT
Leanne Harvey
Director of Business Development
o 949.528.0900 x123
m 949.677.1188
[email protected]

LICENSES
CA License #958960
A, C-53, C-61/D35, D06, D21
DIR: #1000001472

COMPANY DATA
California Waters, LLC.
dba California Waters
Fed ID: 27-1115518
Company Founded: 1999
Design/Construction: 2011

COMPANY PROFILE
• Commercial Pools & Spas
• Water Features
• Interactive Splash Pads
• Aquatic Facilities
• Waterscapes
• Lakes, Ponds & Streams
• Themed Environments
• Natural & Artificial
Rockwork
California Waters is pleased to submit this proposal for splash pad design and engineering services. Attached is our exhibit“A”, “Scope of Engineering Services”, exhibit“B”, “Compensation”, and exhibit“C”, “2025 Hourly Engineering Rate Schedule”.
775
23311 E. La Palma Ave. | Yorba Linda, CA 92887 | 949.528.0900 | californiawaters.com | CA Lic#958960 Ironwood Park Splash Pad, City of Palm Desert

Objective: Provide conceptual design and engineering services for a new up to 2,000 square foot, interactive splash pad to be constructed on grade. Consultant agrees to perform the following services:

A. Work with the Design team to determine the splash pad size, location, layout and design intent including theming, color, water effects, relation to surrounding environment, target audience, lighting, etc.

B. Using the design intent preferences, develop 2 preliminary concept options for review, consideration and discussion.

C. Coordinate with the Client to incorporate preferred design components, finalize the design and layout of the water play components from preliminary concept to final concept by providing up to three revisions and obtain final approval from the Design Team and the City of Palm Desert.

Conceptual Design Deliverables:

Consultant shall provide client for review and approval: One (1) conceptual layout set of the proposed splash pad renderings and one (1) preliminary cost estimate to construct the splash pad.

A. Consultant shall coordinate with Owner and other project team consultants to determine site requirements and constraints regarding the equipment and surge tank location and access, piping corridor between the splash pad, surge tank and new equipment area, mechanical, electrical, chemical equipment locations and other pertinent design elements that pertain to the splash pad.

B. Consultant shall identify domestic water supply points and utility connection sizes for the splash pad and coordinate the use of water supply points with the project team.

C. Consultant shall coordinate the location and sizing for the filter backwash line located in the equipment area, surge tank overflow sewer requirements (as applicable) including all points of connection to the sanitary sewer system for the splash pad.

D. Consultant shall coordinate the location and routing of the storm drain line to each main drain including storm drain line sizing and points of connection to act as a rain diverter as required by CBC.

Schematic Design Deliverables:

Consultant shall provide client for review and approval: One (1) schematic design set of drawings to include: layout and locations of the splash pad in confluence with the surge tank and equipment room, a utility coordination drawing and a drawing locating all underground piping/conduit runs between the splash pad, surge tank and equipment room.

A. Consultant shall prepare preliminary sizing for all splash pad equipment based upon the hydraulic requirements, drainage requirements, standard filtration turnover, water effect flow rate 776
23311 E. La Palma Ave. | Yorba Linda, CA 92887 | 949.528.0900 | californiawaters.com | CA Lic#958960 requirements, UV flow requirements, circulation system requirements, surge tank requirements, including sizing of the equipment room and preliminary equipment layout.

B. Consultant shall develop the splash pad circulation and effects pump systems and piping layout to include pump sizing, drainage piping from the splash pad to the surge tank, all pipe runs will include the preliminary pipe routing.

C. Consultant shall prepare data table listing area, with square footage, volume, filter turnover rate, and UV turnover rate calculations for the splash pad.

D. Consultant to provide drawings and specifications indicating all splash pad water play elements, main drain/rain diverter and mechanical equipment required to operate the splash pad.

E. Consultant shall prepare equipment room layout and provide space requirements addressing the effects/circulation pumps, filter, UV and chemical equipment to operate the splash pad.

F. Phone conferences via GoToMeeting will be held as required to go over the progress of the plan set and discuss specifics about the project.

Design Development Deliverables:

Consultant shall provide client for review and approval: One (1) design development level design package to include: splash pad plan view, splash pad longitudinal sections, and splash pad appurtenance details.

A. Consultant shall provide electrical coordination for all the electrical equipment associated with the splash pad. Consultant shall coordinate electrical MCC panel design and coordinate splash pad electrical requirements with site Electrician.

B. Design of system shall include electrical engineering design for the splash pad equipment, controls, and automation. Electrical plans to include single line diagram, load calculations, panel schedule, electrical site plan, and equipment and field wiring diagram.

C. Electrical plans shall be signed, stamped and sealed by a California licensed Electrical Engineer.

D. Electrical design does not include equipment or controls not specified by Consultant.

Electrical Design Deliverables:

Consultant shall provide client for review and approval: one (1) set of California stamped electrical construction documents for the splash pad.

A. Consultant shall size the splash pad concrete deck, water play element footings, surge tank structure and equipment housekeeping pads.

B. Consultant shall size and space rebar required to build the splash pad concrete deck, water play element footings, surge tank structure and equipment housekeeping pads. 777
23311 E. La Palma Ave. | Yorba Linda, CA 92887 | 949.528.0900 | californiawaters.com | CA Lic#958960 C. Consultant shall specify concrete mix design used to construct the splash pad concrete deck, water play element footings, surge tank structure and equipment housekeeping pads.

D. Structural plans shall be signed, stamped and sealed by a California licensed Structural Engineer.

E. Structural design does not include or other structural appurtenances.

Structural Design Deliverables:

Consultant shall provide client for review and approval: One (1) set of California stamped structural construction documents with structural calculations for the splash pad.

A. Based upon completion and approval of the Design Development phase, the Consultant shall prepare final construction plans and details.

B. Consultant shall prepare plans at an appropriate scale on 24” x 36” sheet, using AutoCAD MEP version 2023. All AutoCAD base files prepared by other parties to be provided.

C. Plans will include the preparation of a title and notes sheet, plan sheets and detail sheets. The plan and detail sheets will include the following design elements:

1. Plan view of the equipment area and all equipment, piping layouts, fill source connections, overflow/drain/backwash connections, applicable easements, right of way, and PUE’s.

2. Isometric (three dimensional) layout of the equipment area (splash pad only).

3. Equipment room details shall include:
i. Plan and elevation views.
ii. All equipment including specification and locations of pumps, filters, UV, disinfection equipment control panels, and valves and fittings required for construction.

5. Architectural detail coordination shall include:
i. Coordination of all cross sections and elevation details needed for construction. ii. Specification of all pipe sizes, pipe penetrations, intakes, discharges, drains and overflows.

6. Hydraulic calculations shall include:
i. Suction and discharge pipe sizing.
ii. Drainage pipe sizing.
iii. Filtration sizing.
iv. Disinfection design and phasing.

7. Standard detail coordination shall include:
i. Pipe penetration details, grading details, and other miscellaneous details needed for construction.

Construction Documentation Deliverables:

Consultant shall provide client for review and approval: One (1) set of final construction documents to include:
splash pad plan views, splash pad longitudinal sections, splash pad concrete finish details, splash pad appurtenance details, splash pad structural sections and reinforcement schedules, structural calculations, splash pad piping plan, mechanical equipment piping plan, mechanical equipment sections and details, splash pad panel schedule and miscellaneous splash pad electrical details, one (1) set of specifications in CSI format and one (1) final cost estimate to construct the splash pad.
778
23311 E. La Palma Ave. | Yorba Linda, CA 92887 | 949.528.0900 | californiawaters.com | CA Lic#958960 A. Consultant shall submit the plan set to Riverside County’s Environmental Health Department and the City of Palm Desert’s Building Department to ensure the plans are approved for construction.

Response revisions, prepared concurrently, to address the Health Department and Building Department comments have been included in our base fee.

B. Any additional submissions and/or responses to multiple agency comments that do not pertain to the splash pad design such as ancillary facilities, ingress/egress, ADA path travel, fencing and gate design, etc. will be subject to additional fees and billed per the rates listed in exhibit “C”.

A. Consultant shall be a representative of and shall advise and consult with Client during construction until final payment to the Contractor is due, and as an additional service at Client’s direction from time to time during the construction period described in the Contract for Construction. Consultant shall have the authority to act on behalf of Client only to the extent provided in this proposal unless otherwise modified. Consultant shall provide the following construction support services:

1. Respond to all Requests for Information (RFI’s).

2. Review and advise on submittals, shop drawings, product information, and material samples.

3. Assistance with the issuance and negotiation of change orders.

4. Review of Contractor submitted Record Drawings for contract conformance and completeness based upon the field observations.

5. Consultant shall visit the site at intervals appropriate to the stage of construction or otherwise agreed by Client and Consultant in writing to become generally familiar with the progress and quality of the work completed and to determine in general if the work is being performed in a manner indicating that the work when completed will be in accordance with the Contract Documents. However, Consultant shall not be required to make continuous on-site inspections to check the quality or quantity of the work. On the basis of on-site observations, Consultant shall keep Client informed of the progress and quality of the work and shall undertake to guard Client against defects and deficiencies in the work.

6. Consultant has included in this proposal two (2) Project site visits. 779
23311 E. La Palma Ave. | Yorba Linda, CA 92887 | 949.528.0900 | californiawaters.com | CA Lic#958960 EXHIBIT “B” COMPENSATION #25018
PROJECT: Ironwood Park Splash Pad, Palm Desert, CA

California Waters will complete the work outlined in exhibit “A” and invoice the Client monthly on a percentage of completion basis, per phase as defined below.

DESIGN SERVICES TASK DESCRIPTION FEE
Task II Preliminary Planning & Conceptual Design (Lump Sum) $2,000 Task III Construction Documents - Schematic Design (Lump Sum) $2,000 Task III Construction Documents - Design Development (Lump Sum) $7,000 Task III Construction Documents - Electrical Design (Lump Sum) $2,000 Task III Construction Documents - Structural Design (Lump Sum) $3,500 Task III Construction Documents - Documentation (Lump Sum) $6,000 Task III Construction Documents - Agency Approvals (Lump Sum) $2,000 Task IV Bidding & Construction Support - Construction Administration (Lump Sum) $3,000 TOTAL CONSULTING FEES $27,500

DESIGN ADDITIVE ALTERNATES
Splash Pad Equipment Anchoring Structural Calcs (if required) +$1,200 Monthly invoices will be submitted based upon percent complete by work task for the lump sum task items and based upon actual labor hours for the T & E task items. If requested, additional services will be billed for on an hourly basis, in conformance with the rates outlined in exhibit “C” 2025 Hourly Engineering Rate Schedule.

ASSUMPTIONS & CLARIFICATIONS

1.0 Consultant’s services are intended for the Client’s sole use and benefit and solely for the Client’s use on the Project. Except as agreed to in writing, Consultant’s services and work product shall not be used or relied on by any other person or entity, or for any purpose following substantial completion of the project.

2.0 Consultant’s services shall be provided consistent with and limited to the standard of care applicable to such services, which is that Consultant shall provide its services consistent with the professional skill and care ordinarily provided by consultants practicing in the same or similar locality under the same or similar circumstances.

3.0 Consultant shall seek to comply with Building Codes applicable to the Project as is consistent with the professional standard of care and may seek and rely on the direction and input of public officials and others in doing so.
780
23311 E. La Palma Ave. | Yorba Linda, CA 92887 | 949.528.0900 | californiawaters.com | CA Lic#958960

4.0 Consultant’s services shall be limited to those expressly set forth above, and Consultant shall have no other obligations or responsibilities for the Project except for as agreed to in writing or as provided in this Agreement.

5.0 This proposal and all obligations described herein are intended for the sole benefit of the Parties and are not intended to create any third-party rights or benefits.

6.0 This proposal includes two site visits during the Construction Administration phase of the project.

7.0 All drawings and documents will be submitted electronically.

8.0 Drawings will be created using AutoCAD 2024 software.

9.0 The splash pad will be designed using industry standard equipment and components.

10.0 The domestic water supply, electric power, natural gas, heater combustion air ventilation, equipment room air ventilation, storm drain and sewer utilities to be designed by others. Consultant to provide equipment manufacture’s requirements in order to assist with the above design work.

EXCLUSIONS TO SCOPE OF SERVICES

1.0 The Client’s responsibilities shall include providing California Waters with the base data and project information in a timely manner, coordination and management of other team consultants to assure that the project schedule can be met, and prompt payment of invoices in accordance with the terms and conditions included herein. The specific items that are to be provided by the Client or other consultants include the following:

1.1 Client input pertaining to project design issues and requirements including scheduling.

1.2 Any other data that directly impacts California Waters ability to perform the design in an efficient and economic manner.

1.3 Base sheets in digital (AutoCAD .dwg) format, including, but not limited to the proposed drawing title block, site plan and location of splash pad, floor plan illustrating the proposed splash pad equipment vault location.

2.0 It is agreed that changes in the Scope of Work requested by Client or by reason of revisions or changes in any applicable law, regulation, policy, standard or personnel of any governmental agency, district or utility company having jurisdiction over all or any part of the project after the date this Agreement shall constitute Extra Work, and Consultant shall be compensated for said Extra Work as agreed between Consultant and Client or on a time-and-materials basis pursuant to Consultant’s then effective rate schedule. Client also understands and agrees that the costs of Consultants services are subject to change due to conditions encountered during the course of furnishing services, including but not limited to changes in the Scope of Work, delays, unanticipated or additional requirements imposed by government agencies, districts, utility companies, or other persons, acts of God, or actions of other parties.

3.0 No environmental documentation or support, including no environmental permitting.

4.0 No surveying or construction staking is included.
781
23311 E. La Palma Ave. | Yorba Linda, CA 92887 | 949.528.0900 | californiawaters.com | CA Lic#958960

5.0 Local government approval meetings, hearings, etc., and preparation of presentation graphics will be under separate work authorization, if required.

6.0 Utilities design to the water feature points of connection to include: sanitary sewer, storm sewer, domestic water, and electrical distribution, and telephone or data communications.

7.0 Existing utility information research and mapping is not included and will be provided by Client.

7.0 Client agrees to pay the costs of permitting, checking and inspection fees, zoning, annexation and other applicable fees, assessment fees, soils engineering fees, soils testing fees, and all other professional service fees, permits, bond premiums, title company charges, blueprints and reproductions, and all other charges and expenses necessary for performance relating to the Scope of Work.

8.0 The existence, location, type and size of any underground utilities, improvements and/or obstacles WILL NOT be determined by Consultant. Consultant makes no promise, representation, or warranty, expressed or implied, as to the existence, location, type or size of any underground utility, improvement or obstacle. Client agrees to include as a condition of any construction contract relating to the project the requirement that the contractor verify the existence, location, type and size of any underground utilities, improvements or obstacles, whether shown on any construction plan or not, and if such requirement is not included in such construction contract, or if the contractor fails to verify the existence, location, type and size of any underground utilities, improvements or obstacles, Consultant shall not be liable for any delays, expenses or liability suffered by Client and Client agrees to defend and indemnify Consultant against any loss, damage, liability and costs, including attorneys’ fees suffered or claimed by any other person by reason of the existence of any underground utility, improvement or obstacle, and any additional cost incurred by Consultant shall be deemed extra work for which Consultant will be paid on a time-and-materials basis pursuant to consultant then effective rate schedule.

9.0 Rain diverter – If a storm drain connection is not viable, additional design fees will be required to incorporate a settling system design into the project.

10.0 SWPPP Plan is not included in this proposal.

11.0 Operation and Maintenance manuals are not included in this proposal.

12.0 Bid document creation tasks are not included in this proposal.

13.0 The use of REVIT design software.

14.0 The Construction and installation of the splashpad.

16.0 Mock-ups of any kind.

17.0 Site lighting design work of any kind.

18.0 Landscape/hardscape design outside of splash pad area. 782
23311 E. La Palma Ave. | Yorba Linda, CA 92887 | 949.528.0900 | californiawaters.com | CA Lic#958960

19.0 Special studies including but not limited to water quality analysis, wind studies, and environmental impact reports.

20.0 Electrical design does not include equipment or controls not specified by Consultant.

21.0 Design of the equipment room make-up air/air ventilation and/or heater intake and exhaust system design.

22.0 The production or review of As-Built drawings.

23.0 Splash pad ancillary facility design services to include the pool deck, pool deck drainage, hose bibs and associated domestic water supply, pool enclosure and gates, landscape, showers, sanitary facilities, lavatories, and drinking fountains.

24.0 Storm Water Management Programming, Civil site work, water remediation and runoff control per jurisdictional requirements.

25.0 Soils testing/engineering, including finalized geotechnical investigation report. Please note that unusual soil conditions such as expansive soils, fill soils, soils with low bearing capacity (under 2,000 psf) and high-water tables which require additional engineering will be considered an additional service and compensated for in conformance with exhibit “C” 2024 Hourly Engineering Rate Schedule. This includes piles, piers, and/or mat slabs, and dewatering systems.

26.0 If applicable, design of the splash pad equipment enclosure structure.

27.0 Design of natural gas supply to the splash pad heaters to include the gas pressure regulator.

28.0 Design of the splash pad heater ventilation system and routing.

29.0 Design of the equipment room make-up air/air ventilation system.

30.0 Seismic engineering for pipe hanging systems.

31.0 Design in REVIT.

32.0 Miscellaneous plan check and permit fees as may be required by regulatory agencies.

33.0 BIM plan generation.

34.0 Acoustic design services.

35.0 All construction projects require inspection and maintenance following completion of the work.

Operation, inspection, and maintenance are the sole responsibility of the Project Owner and Consultant shall have no responsibility for any failures by the Project Owner or others to properly operate, inspect, or maintain the project.

36.0 All out of town travel related expenses are excluded and will be reimbursed as outlined in exhibit “C” of this proposal.
783
23311 E. La Palma Ave. | Yorba Linda, CA 92887 | 949.528.0900 | californiawaters.com | CA Lic#958960

INDEMNITY

1.0 Consultant and Client mutually agree, to the fullest extent permitted by law, to indemnify and hold each other harmless from any and all damages, liabilities or costs, including reasonable attorneys’ fees and defense costs, arising from their own negligent acts, errors or omissions, or willful misconduct in the performance of their services per this proposal, to the extent that each party is responsible for such damages, liabilities and costs on a comparative basis of fault.

2.0 In the event Consultant’s indemnity obligations set forth above are in conflict with the Prime Agreement signed by Client for this specific project, Consultant agrees that the indemnity obligations provided in the Prime Agreement shall govern in all instances to the fullest extent permitted by law.

3.0 These indemnification provisions shall survive the termination or expiration of this Agreement and shall remain in full force and effect as long as permitted by law.

USE OF DOCUMENTS

1.0 Client acknowledges the Consultant’s construction documents as instruments of professional service. Nevertheless, the drawings and specifications shall become the property of Client upon completion of the work and payment in full of all monies due to the Consultant. Client shall not reuse or make any modifications to the drawings and specifications without the prior written consent of Consultant. Client agrees, to the fullest extent permitted by law, to indemnify and hold the Consultant harmless from any claim, liability or cost (including reasonable attorney’s fees and defense costs) arising or allegedly arising out of any unauthorized reuse or modification of the construction documents by Client or any person or entity that acquires or obtains the plans and specifications from or through Client without the written authorization of the Consultant.

2.0 Electronic files may be provided by Consultant for review by Client and use by the Design Team in the preparation of construction documents. Consultant assumes no responsibility for determining whether the date or software format are correct, up-to-date, or together represent actual conditions, or liability for the translations or results thereof. Acceptance or use by Client of electronic files shall constitute a total release from liability, and as an indemnification for all costs or expenses from any claims, suits, judgments, or any other. 784
23311 E. La Palma Ave. | Yorba Linda, CA 92887 | 949.528.0900 | californiawaters.com | CA Lic#958960 actions or liability as a result of such use. Under no circumstances shall delivery of the electronic files be deemed a sale by Consultant, and Consultant makes no warranties, either express or implied, of merchantability and fitness for any particular purpose. In no event shall Consultant be liable for any loss of profit or any consequential damages as a result of re-use of electronic files. Drawing plan views may be delivered in AutoCAD .dwg or Adobe .pdf format. Drawing detail sheets are considered proprietary and will be delivered in AutoCAD .dwg or Adobe .pdf format only.
785
23311 E. La Palma Ave. | Yorba Linda, CA 92887 | 949.528.0900 | californiawaters.com | CA Lic#958960 EXHIBIT “C”
2025 HOURLY ENGINEERING RATE SCHEDULE
LABOR FEES:
• Unless otherwise agreed, fees for professional services are based on the time charged to the project.

RATE ADJUSTMENTS:
• The above hourly rates apply to work performed during the 2025 calendar year. Work performed after the end of 2025 will then be at the then-current rate schedule.

EMERGENCY SERVICE RATES:
• For emergency work requested by clients with less than 48-hour notice, time shall be billed at a rate of

1.5x the above Hourly Rates, with a four-hour minimum charge.

REIMBURSABLE EXPENSES:
• The following items will be expensed at direct cost-plus fifteen percent (15%) for the following:
▪ Air travel, lodging, auto rental, tolls, parking, meals and related expenses. ▪ Rental or purchase of materials and equipment.
▪ Sub-consultants.
▪ Outside blueprinting and reprographic services.
▪ Other outside expenses incurred for the project on behalf of the Client. • In House Reproduction items will be expensed at direct cost-plus ten percent (10%) for the following:
▪ Black & White Prints & Copies (8 ½” x 11 up to 12” x 18”) $0.20 per sheet ▪ Color Prints & Copies (8 ½” x 11 up to 12” x 18”) $1.30 per sheet ▪ Black & White Bond Plots & Copies $0.92 per sheet
▪ Color Bond Plots & Copies $1.74 per sheet
▪ Coil/GBC Punch Binding $1.35 each
NON-SOLICITATION:
• Client agrees not to solicit California Waters employees for direct employment with client without the explicit written approval from California Waters for a period of two years following employee’s termination of employment with California Waters. Should client desire to arrange for direct employment with California Waters personnel, an equitable fee will be agreed to by and between California Waters and client for California Waters costs for recruitment, training, overhead and other costs associated with employee turnover.

CLASSIFICATION HOURLY BILLING RATE
Officer/Principal $200.00
Registered Engineer $175.00
Senior Project Manager $150.00
Project Manager $135.00
Design Engineer $125.00
Senior CAD Designer $100.00
CAD Designer $80.00
Project Coordinator $60.00
Administrative & Clerical Support $50.00
786
10221-A Trademark St., Rancho Cucamonga, CA 909-484-2800

PARK AND TRAILHEAD (RFP)

CITY OF PALM DESERT

Page 17 ends

ASSIGNED FOR PROJECT

IN-HOUSE PERSONNEL

SUBCONSULTANT

COLOR CODE LEGEND

TEAM ORGANIZATIONAL CHART
Team Organization
ADG Principals
Andrew Krumwiede, Gregg Denson
Consultant Firm

ARCHITERRA DESIGN GROUP
Administration Manager
Kiley Sandoval
Marketing Coordinator/ Graphic Designer
Clara Boline, MBA
Project Managers
Ryan Skolny - PLA #6551
Peter Dalman - PLA #5488
Kay Kite - PLA #6760, CID, CLIA
Aaron Odland - PLA #7049
Landscape Designers
Jennifer Lioy
Municipal Plan Check Coordinator
Michael Moreno
Jesus Fernandez
Juan Garcia
Daniel Jacobs
Raphael Tumbokon
Laura Vasquez
Michael Wagner
Valerie Alegre
Subconsultants
Madole & Associates, Inc
Civil Engineer
SVA, Inc
ARchitect
JCA Engineering
Electrical Engineering
California Waters
Water Features
ECORP
Environmental Consultants
AGI
Grant Writing
GeoTek
Geotechnical
Director of Design
Gregg Denson PLA #4302
787
10221-A Trademark St., Rancho Cucamonga, CA 909-484-2800

PARK AND TRAILHEAD (RFP)

CITY OF PALM DESERT

Page 11 ends

Relevant Project Experience
• Hamilton Park, Pomona, CA
Role: Director of Design Landscape Architect
City of Pomona | 2020
• Hillbrook Park, Signal Hill, CA
Role: Director of Design Landscape Architect
City of Signal Hill | 2023
• Cucamonga Basin #6, Upland, CA
Role: Director of Design Landscape Architect
San Bernardino Flood Control District | 2008
• North Etiwanda Preserve, Rancho Cucamonga, CA
Role: Director of Design Landscape Architect
San Bernardino County Special Districts | 2006
• Rails to Trails Route 66, Rancho Cucamonga / Rialto, CA Role: Director of Design Landscape Architect
City of RC and Rialto | 2014
• Desert Valley Conservation Area, Joshua Tree, CA
Role: Director of Design Landscape Architect
County of San Bernardino | 2011
Mr. Denson is responsible for overseeing all aspects of project design from inception to completion. His duties would include participation in client meetings, design development, and finalization of all formal design exhibits.

He has been involved with the design of some of the firm’s most challenging park, trail, and master planned projects. The talented design team he heads up works on projects focusing on sustainable design such as open space public gathering areas, retrofits of existing public facilities for resource conservation, specific plan developments for master planned communities, schools, mixed-use residential developments, trail planning, and open space preserve enhancement projects.

Gregg Denson, ASLA, PLA#4302
President/Director of Design Landscape Architect
Industry Experience
• 30 Yrs Industry Experience
• 25 Yrs with ARCHITERRA
Certifications & Licensing
• Registered Landscape
Architect California #4302
• ASLA
• CPRS
• California Native Plant
Landscape Program
Education
• B.S. Landscape Architecture;
California State Polytechnic
University, Pomona
Trail Design Open Space
Planning
Park
Design
Habitat
Restoration
Relevant Experience
C. FIRM STAFFING AND KEY PERSONNEL
788
10221-A Trademark St., Rancho Cucamonga, CA 909-484-2800

PARK AND TRAILHEAD (RFP)

CITY OF PALM DESERT

Page 12 ends

Mr. Dalman joined Architerra after nearly 20 years of professional experience providing landscape design and construction
management at some of the finest landscape architecture firms in Southern California, including Disney Imagineering Studios. His portfolio includes a wide variety of municipal, public agency and private development projects.

His duties include all facets of project management for a diverse portfolio of clients. He has been a project manager for public agency and commercial campus design; private and public schools and universities; public parks, streetscapes; master planned residential communities, model homes, and open space including trails and parks.

Peter Dalman, ASLA, PLA#5488
Project Manager
Industry Experience
• 25 Yrs Industry Experience
• 6 Yrs with ARCHITERRA
Certifications & Licensing
• Registered Landscape
Architect California #5488
• California Native Plant
Landscape Program
Education
• B.S. Landscape Architecture;
California State Polytechnic
University, Pomona
• Minor in Ornamental
Horticulture; California
State Polytechnic University,
Pomona
Trail Design Sportsfields
Design
Park
Design
Active and
Passive Design
Relevant Experience
Relevant Project Experience
• Hamilton Park, Pomona, CA
Role: Project Manager
City of Pomona | 2020
• Civic Center Amphitheater, Moreno Valley, CA
Role: Project Manager
City of Moreno Valley| 2023
• Sunset Park, Montclair, CA
Role: Project Manager
City of Montclair | 2022 - Present
• Dominguez Park, Redondo Beach, CA
Role: Project Manager
City of Redondo Beach | 2022 - Present
• Wildomar 20-acre Passive Park, Wildomar, CA
Role: Project Manager
City of Wildomar | 2023 - Present
• Saratoga Park, Montclair, CA
Role: Project Manager
L.D. King | 2023- Present
C. FIRM STAFFING AND KEY PERSONNEL
789
10221-A Trademark St., Rancho Cucamonga, CA 909-484-2800

PARK AND TRAILHEAD (RFP)

CITY OF PALM DESERT

Page 13 ends

Kay comes to ADG with over twenty-five years of practical and theoretical irrigation training as well as her experience as a senior Landscape Architect. Her practice includes site design, campus and urban planning, planting design, and project management. She specializes in water conservation, native plant palettes, and efficient irrigation designs.

Her experience includes designing projects that from small private residences, university campuses, parks of all sizes, along with commercial and industrial projects. She has worked directly with contractors and maintenance personnel both pre and post construction to provide site inspections and to assist and refine designs for longevity and practicality while maintaining the desired aesthetic.

Kay Kite, ASLA, PLA#6760, MLA, ASIC, CID, CLIA
Project Manager
Industry Experience
• 26+ Yrs Industry Experience
• 1.5 Yrs with ARCHITERRA
Certifications & Licensing
• Registered Landscape
Architect California #6760
• Certified Irrigation Designer
(CID)
• Certified Landscape
Irrigation Auditor (CLIA)
Education
• Master Landscape
Architecture (MLA)
from Cal Poly Pomona
• Certified Irrigation
Designer (CID) and a
Certified Landscape
Irrigation Auditor
(CLIA)
Trail Design Splash Pad
Design
Park
Design
Sports Court
Design
Relevant Experience
Relevant Project Experience
• Ayala Park Splash Pad, Bloomington, CA
Role: Project Manager
City of Bloomington | 2023-Present
• Ketchum-Libolt Park, Costa Mesa, CA
Role: Project Manager
City of Costa Mesa | 2023-Present
• MacKay Park Pickle Ball Courts, Lake Arrowhead, CA
Role: Project Manager
City of Lake Arrowhead | 2023-Present
• Four Elementary School “Greening” Projects, Los Angeles, CA Role: Project Manager
Los Angeles Unified School District (LAUSD) | 2023-Present C. FIRM STAFFING AND KEY PERSONNEL
790
10221-A Trademark St., Rancho Cucamonga, CA 909-484-2800

PARK AND TRAILHEAD (RFP)

CITY OF PALM DESERT

Page 14 ends

Ryan Skolny began with ADG in 2014, and advanced quickly to his current position because of his ability to manage projects, as well as identify and implement the design and planning process. Mr. Skolny is very familiar with trail system design and preparing conceptual plans and construction documents. He brings a wealth of knowledge in landscape architecture design and senior project manager expertise.

Mr. Skolny is very familiar with preparing bid ready documents for new projects and irrigation and planting drought tolerant retrofits and park planning.

Ryan Skolny, ASLA, PLA#6551
Project Manager
Industry Experience
• 21 Yrs Industry Experience
• 11 Yrs with ARCHITERRA
Certifications & Licensing
• Registered Landscape
Architect California #6551
Education
• Master of Science
in Landscape
Architecture, Cal Poly,
Pomona.
• BA Landscape
Architecture,
AA Landscape
Architecture
Trail Design
Water
Feature
Design
Park
Design
Local Desert
Designs
Relevant Experience
Relevant Project Experience
• Grand Park Splash Pad, Ontario, CA
Role: Project Manager
Lennar | 2020 - 2023
• Atwell Open-Space and Trails, Banning, CA
Role: Project Manager
Tri Pointe| 2022 - 2024
• Edenglen Dog Park, Ontario, CA
Role: Project Manager
Brookfield Properties | 2022 - Present
• Atwell Pickleball Courts and Parks, Banning, CA
Role: Project Manager
Tri Pointe | 2022 - 2024
• East Park in Parklane, Ontario, CA
Role: Project Manager
Lennar | 2023 - 2024
• Tiera Rejada Park and Playground Improvements, Moorpark, CA
Role: Project Manager
City of Moorpark | 2020 - 2023
C. FIRM STAFFING AND KEY PERSONNEL
791
10221-A Trademark St., Rancho Cucamonga, CA 909-484-2800

PARK AND TRAILHEAD (RFP)

CITY OF PALM DESERT

Page 15 ends

Mr. Odland has over 18 years of professional experience providing landscape design and construction management at national and state award winning landscape architecture firms in Southern California and Central Texas. His portfolio includes a wide variety of municipal, public agency and private development projects.

At Architerra, Mr. Odland’s duties include all facets of project management for a diverse portfolio of clients. In his career, he has been a project manager for public agency and commercial campus design; private and public schools and universities; public parks, streetscapes; master planned residential communities, model homes, and multi-family housing.

Aaron Odland, SITES AP Certified, PLA#7049
Project Manager
Industry Experience
• 18+ Yrs Industry Experience
• 1 Yr with ARCHITERRA
Certifications & Licensing
• Registered Landscape
Architect California #7049
• Registered Landscape
Architect Texas
Education
• Master of Landscape
Architecture, UC
Berkeley
• SITES AP Certified
Trail Design
Water
Feature
Design
Park
Design
Native Plant
Design
Relevant Experience
Relevant Project Experience
• MacArthur Park, Montclair, CA
Role: Project Manager
LD King, Civil Engineering | 2024 - Present
• Panorama Promenade Slope Trail, Signal Hill, CA
Role: Project Manager
City of Signal Hill | 2024 - Present
• Griffith Paseo Park, Round Rock, TX
Role: Project Manager
McKinney York Architects | 2023 - Present
• Plum Creek Cultural Trail, Kyle, TX
Role: Project Manager
Momark Developers | 2022 - Present
• Midtown Houston Park, Houston, TX
Role: Project Manager
Midtown District | 2022 - 2023
• La Verde Park and Splash Pad, Kyle, TX
Role: Project Manager
Momark Developers | 2022 - 2023
C. FIRM STAFFING AND KEY PERSONNEL
792
10221-A Trademark St., Rancho Cucamonga, CA 909-484-2800

PARK AND TRAILHEAD (RFP)

CITY OF PALM DESERT

Page 16 ends

Laura has been with ADG for 3 years, and has experience training new designers in drafting and design projects. Her practice includes planting design and water conservation, irrigation redlines and concepts and conceptual design.

Laura is from Peru, living there until college, and is a native Spanish speaker capable of being an interpretor for community outreach efforts and meetings.

Laura Vasquez, Spanish Interpretor
Landscape Designer
Industry Experience
• 5 Yrs Industry Experience
• 3 Yrs with ARCHITERRA
Education
• Master of Landscape
Architecture, UC
Berkeley
Trail Design Planting
Design IrrigationDesign
Native Plant
Design
Relevant Experience
Relevant Project Experience
• Atwell Open-Space and Trails, Banning, CA
Role: Landscape Designer
Tri Pointe| 2022 - 2024
• Wildomar 20-acre Passive Park, Wildomar, CA
Role: Landscape Designer
City of Wildomar | 2023 - Present
• Hillbrook Park, Signal Hill, CA
Role: Landscape Designer
City of Signal Hill | 2023
• Duarte City Hall, Duarte, CA
Role: Landscape Designer
City of Duarte | 2020
• Atwell Pickleball Courts and Parks, Banning, CA
Role: Landscape Designer
Tri Pointe | 2022 - 2024
C. FIRM STAFFING AND KEY PERSONNEL
793
794
City of Palm Desert
PW - Operations & Maintenance
Randy Chavez, Deputy Director
73-510 Fred Waring Drive, Palm Desert, CA 92260
[HAI, HIRSCH & ASSOCIATES, INC (LANDSCAPE ARCHITECTS)] RESPONSE DOCUMENT REPORT RFP No. 2024-RFP-156
Park and Trailhead Engineering and Design
RESPONSE DEADLINE: March 18, 2025 at 5:00 pm
Report Generated: Wednesday, March 19, 2025
HAI, Hirsch & Associates, Inc (Landscape Architects) Response

CONTACT INFORMATION
Company:

HAI, Hirsch & Associates, Inc (Landscape Architects)
Email:
[email protected]
Contact:

Charles Foley
Address:
2221 E. Winston Road, Suite A
Anaheim, CA 92806
Phone:
(714) 776-4340 Ext: 108
Website:
www.hailandarch.com
Submission Date:

Mar 18, 2025 1:40 PM (Pacific Time)
795
[HAI, HIRSCH & ASSOCIATES, INC (LANDSCAPE ARCHITECTS)] RESPONSE DOCUMENT REPORT RFP No. 2024-RFP-156
Park and Trailhead Engineering and Design
[HAI, HIRSCH & ASSOCIATES, INC (LANDSCAPE ARCHITECTS)] RESPONSE DOCUMENT REPORT Request For Proposal - Park and Trailhead Engineering and Design

Page 2 ends

ADDENDA CONFIRMATION
Addendum #1
Confirmed Mar 7, 2025 2:17 PM by Charles Foley
Addendum #2
Confirmed Mar 7, 2025 2:18 PM by Charles Foley

QUESTIONNAIRE

1. Proposal (WITHOUT COST)*
Proposals shall be concise, well organized and demonstrate qualifications and applicable experience. Proposals shall be organized and include page numbers for all pages in the proposal. The proposal shall be uploaded here, in the following order and shall include:

A. Cover Letter

1. This letter should briefly introduce the firm, summarize the firm’s general qualifications, include an executive summary of the specific approach which will be used to deliver the work scope; and identify the individual(s) name, address and phone number authorized to negotiate Agreement terms and compensation.

B. Experience and Technical Competence

1. Background: Provide history of the firm’s consulting experience which specifically addresses the individual or firm’s experience with similar Service as described in this RFP.

2. References: The proposal shall include a list of recently completed projects that are similar in scope and function to this RFP. Provide a description of the project, client name, and the name, title, and telephone number of the primary contact person.

C. Firm Staffing and Key Personnel
796
[HAI, HIRSCH & ASSOCIATES, INC (LANDSCAPE ARCHITECTS)] RESPONSE DOCUMENT REPORT RFP No. 2024-RFP-156
Park and Trailhead Engineering and Design
[HAI, HIRSCH & ASSOCIATES, INC (LANDSCAPE ARCHITECTS)] RESPONSE DOCUMENT REPORT Request For Proposal - Park and Trailhead Engineering and Design

Page 3 ends

1. Staffing: Provide the number of staff to be assigned to perform the Services and the names/discipline/job title of each as well as your firm’s capacity to provide additional personnel as needed.

2. Key Personnel: Identify key persons that will be principally responsible for working with the City. Indicate the role and responsibility of each individual.

3. Team Organization: Describe proposed team organization, including identification and responsibilities of key personnel.

4. Subcontractors: The Proposer shall identify functions that are likely to be subcontracted and identify the subcontractor that is anticipated to perform each function.

D. Proposed Method to Accomplish the Work

1. Describe the technical and management approach to providing the Services to the City. Proposer should take into account the scope of the Services, and general functions required. Include a draft first year schedule of tasks, milestones, and deliverables that will provide for timely provision of the Services. In reviewing the scope of Services and goals described herein, the Proposer may identify additional necessary tasks and is invited to bring these to the City’s attention within the discussion of its proposed method to accomplish the work.

HAI-Proposal_for_Professional_Design_Services_for_Park_and_Traihead.pdf

2. Fee Proposal*
Please provide a lump-sum, not-to-exceed fee proposal for the scope of Services. The fee proposal shall include hourly rates for all personnel for “Additional Work” (as such term is defined in the proposed Agreement attached herein).

Price_Hirsch_&_Associates,_Inc.pdf

3. Non-Collusion Declaration*
The undersigned declares:

I am an authorized representative of my company, the party making the foregoing Bid, to certify the following.

The Bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The Bid is genuine and not collusive or sham. The Bidder has not directly or indirectly induced or solicited any other Bidder to put in a false or sham bid. The Bidder has not directly or indirectly colluded, conspired, connived, or agreed with any Bidder or anyone 797
[HAI, HIRSCH & ASSOCIATES, INC (LANDSCAPE ARCHITECTS)] RESPONSE DOCUMENT REPORT RFP No. 2024-RFP-156
Park and Trailhead Engineering and Design
[HAI, HIRSCH & ASSOCIATES, INC (LANDSCAPE ARCHITECTS)] RESPONSE DOCUMENT REPORT Request For Proposal - Park and Trailhead Engineering and Design

Page 4 ends

else to put in a sham bid, or to refrain from bidding. The Bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the Bid Price of the Bidder or any other Bidder, or to fix any overhead, profit, or cost element of the Bid Price, or of that of any other Bidder. All statements contained in the Bid are true. The Bidder has not, directly or indirectly, submitted his or her Bid Price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.

Any person executing this declaration on behalf of a Bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the Bidder.

I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct.

Confirmed

4. SAM.gov*
Please enter your legal entity name for SAM.gov verification.

Hirsch & Associates, Inc. Landscape Architects
Click to Verify Value will be copied to clipboard

5. Type of Business*
C Corporation (if corporation, two signatures are required)

6. Litigation*
Provide litigation history for any claims filed by your firm or against your firm related to the provision of Services in the last five (5) years (or type "N/A").

N/A
798
[HAI, HIRSCH & ASSOCIATES, INC (LANDSCAPE ARCHITECTS)] RESPONSE DOCUMENT REPORT RFP No. 2024-RFP-156
Park and Trailhead Engineering and Design
[HAI, HIRSCH & ASSOCIATES, INC (LANDSCAPE ARCHITECTS)] RESPONSE DOCUMENT REPORT Request For Proposal - Park and Trailhead Engineering and Design

Page 5 ends

7. Changes to Agreement*
The City standard professional services agreement contract is included as an attachment herein. The Proposer shall identify any objections to and/or request changes to the standard contract language in this section of the proposal (or type "N/A"). If you are identifying changes here ALSO upload a copy of the redlined Language/Agreement with your Proposal. Changes requested may affect theCity's decision to enter into an Agreement.

N/A

8. No Deviations from the RFP*
In submitting a proposal in response to this RFP, Proposer is certifying that it takes no exceptions to this RFP including, but not limited to, the Agreement. If any exceptions are taken, such exceptions must be clearly noted here, and may be reason for rejection of the proposal. As such, Proposer is directed to carefully review the proposed Agreement and, in particular, the insurance and indemnification provisions therein (or type "N/A").

N/A

9. Project Team Resumes*
Submit resumes of all key personnel/support staff that will produce work product for the Services. Describe their qualifications, education, and professional licensing.

HAI_Project_Team-Palm_Desert.pdf

10. List the Signatory(s) Authorized to Sign and Bind an Agreement.* (If two (2) signatures are required, include the following information for both signatories) A. Full Name
B. Title
C. Physical Business Address
D. Email Address
E. Phone Number
799
[HAI, HIRSCH & ASSOCIATES, INC (LANDSCAPE ARCHITECTS)] RESPONSE DOCUMENT REPORT RFP No. 2024-RFP-156
Park and Trailhead Engineering and Design
[HAI, HIRSCH & ASSOCIATES, INC (LANDSCAPE ARCHITECTS)] RESPONSE DOCUMENT REPORT Request For Proposal - Park and Trailhead Engineering and Design

Page 6 ends

Charles Foley
President
2221 E Winston Rd. Ste A Anaheim, Ca. 92806 714-776-4340 x108 Mark Hirsch
Secretary
2221 E Winston Rd Ste A Aneheim, Ca. 92806 714-776-4340

11. Conflict of Interest Disclosure*
The proposer understands that any and all relationships with construction firms that may submit bids for projects developed under this agreement will require full disclosure of any direct or indirect conflicts of interest, financial interests, relationships, and the nature of any relationships with any related project bid submitters; and that any violation of this provision may result in the immediate termination of the Agreement
Confirmed

12. Certification of Proposal*
The undersigned hereby submits its proposal and, by doing so, agrees to furnish services in accordance with the Request for Proposal (RFP), and to be bound by the terms and conditions of the RFP.

Confirmed
800
Creating Award Winning P r o j e c t s
Since 1977
2221 E. Winston Road, Suite A, Anaheim, CA 92806-5540
Phone 714.776.4340 Fax 714.776.4395 www.hailandarch.com LA #5567 Hirsch & Associates, Inc. HAI Landscape Architecture & Planning Hirsch & Associates, Inc. HAI Landscape Architecture & Planning

ORIGINAL
Proposal for Professional Design Services for the Park
and Trailhead Engineering and Design
Improvements for the City of Palm Desert, CA
801
Community Parks
Hirsch & Associates, Inc. HAI Landscape Architecture & Planning Ramona Park, Long Beach
Client
City of Long Beach, California
Contact
Eric Lopez, Director of Public Works
562-570-5690
Consultants
Landscape Architect (Prime Consultant)
Hirsch & Associates, Inc.

Project Status
Construction Winter 2024
Project Cost
$1,500,000
Project Description
Spend a Day at the beach in North Long Beach, miles from the shoreline. HAI has conducted Community Meetings and Conceptual Design of this destination playground featuring seperate tot lot and school aged structures, ada accessible structures and panels, custom Whale Climber, Kracken, Coral Climber and Mermaid Tail Climber, 100% rubber surfacing. The theme is Sea Play and includes rock Jetties and in grade activated Fog Jets creating a marine themed environment.
802
Playground
Hirsch & Associates, Inc. HAI Landscape Architecture & Planning Civic Center Park
Pomona, CA
Client
City of Pomona, California
Contact
Mr. Matt Pilarz
[email protected]
(909) 620-2275
Consultants
Landscape Architect (Prime Consultant)
Hirsch & Associates, Inc.

Civil Engineer
Blue Peak Engineering
Electrical Engineer
IDS
Architect
Crane Architectural
Project Status
Grand Opening July 2025
Project Cost
$12 Million
Project Size
1-acre
Project Description
The City intends to construct a new destination playground on the Civic Campus, a registered Historic Site.

HAI conducted community outreach and presented the design to the Historic Preservation Commission, Parks and Recreation Commission, Community Groups and City Council. The design integrates the equipment into the hillside and allows for a truly universally accessible environment. Folks using mobility devices are able access second level play with able bodied users. The project includes renovation of the historic and currently inoperable fountain located within the adjacent plaza in front of the courthouse. Custom designed buildings include a new restroom as well as maintenance pump building. Group picnic, water play zone, climbing and fog zones compliment separate Tot Lot and 5-12 structures. Built into the hillside is bleacher seating with ADA access included.
803
Playgrounds
Hirsch & Associates, Inc. H
Landscape Architecture & Planning AI
Renovation of 10
Playgrounds
Westminster, CA
Client
City of Westminster, California
Contact
Mr. Tuan Pham, Public Works
(714) 548-3456
Consultants
Landscape Architect (Prime Consultant)
Hirsch & Associates, Inc.

Civil Engineer
Blue Peak Engineering

Project Status
4 completed, 2 Under
Construction, 4 Waiting to Bid
Project Cost
$6 Million
Project Size
Each Playground less than 1 acre
Project Description
The City has undertaken renovation of specific play areas Citywide. Rather than complete demolition of entire playgrounds, the approach is to replace within the existing footprint of each play area. There is minor concrete removal and replacement occurring dependent on condition of paving. This approach allowed the City stretch limited budgets and spend their dollars on play equipment rather than site work. Each play area has been designed with community input that HAI solicited during play area workshops. Some of the play areas have been themed such as Westminster Park’s all-inclusive playground and Baseball theme. The Park is Home to the Challenger Little League Team. An organization that provides opportunity for disabled children to play baseball. Wheelchair access into the play structures if provided with ramps. Margie Rice Park is located across from a County Fire House and the area children asked for a Firehouse themed playground.

Others include a Castle themed structure at Newcastle Park (bidding) and Marine theme at Sigler Park.

Margie Rice Park
Liberty Park
804
Community Parks
Hirsch & Associates, Inc. HAI Landscape Architecture & Planning Adelanto Park, City of Adelanto
Jonathan St. and Chamberlain way
Client
City of Adelanto, California
Contact
Saba Engineer, City Engineer
(818) 522-7966,
[email protected]
Consultants
Landscape Architect (Prime Consultant)
Hirsch & Associates, Inc.

Project Status
Completed Winter 2024
Project Cost
$2,750,000
Project Description
The City was awarded a State Park Grant to construct a new park on unimproved land. The Concept prepared for the grant included and required a new restroom building, splash pad, play equipment, sport court, shaded picnic seating, small parking lot, lighting, fencing, landscape and irrigation. HAI worked with the City and Value Engineered the design in order to bring the project into budget. The project has recently completed construction.

805
Community Parks
Hirsch & Associates, Inc. HAI Landscape Architecture & Planning Client
City of Long Beach, California
Contact
Eric Lopez, Director of Public Works
562-570-5690
Consultants
Landscape Architect (Prime Consultant)
Hirsch & Associates, Inc.

Project Status
10 Completed, 2 Under Construction
Project Cost
$7,000,000
Project Description
HAI is assisting the City in renovating a number of play areas throughout the City utilizing Long Beach MeasureA funding. Each play area being upgraded is intended to be different from the others. The play areas are considered to be “destination” play areas featuring unique equipment and site features such as slides built into hillsides, zip lines and custom play features featuring Dinosaurs and skateboard furnishings. The project started in 2017 and is still in progress based funding availability. Parks included are Drake, Eldorado, Jackson, Veterans, MLK, Whaley, Recreation, Channel View, Los Cerritos, Recreation, Colorado Lagoon and Cherry.

Long Beach Playgrounds,
Renovation of 12 Play Areas
Long Beach, CA
806
Community Parks
Hirsch & Associates, Inc. HAI Landscape Architecture & Planning Client Contact
City of Cypress, California Mr. Nick Mangkalakiri, Senior Civil Engineer City of Cypress
Consultants Cypress, CA 90630
Landscape Architect (Prime Consultant) (714) 229-6729, [email protected] Hirsch & Associates, Inc.

Project Status Project Cost Project Size Video Link
Completed November 2017 $2.7 million 2.9-acres http://VIMEO.COM/24888071 Project Description
Mackay Park is developed on a 2.9-acre portion of the former Mackay Elementary School property. The remaining portion of the school site has been redeveloped and features a new residential community. The park design was derived through community meetings conducted by HAI with area residents, and meeting with City staff, Park Commission and City Council. The new park will feature both active and passive recreation, user-friendly activities and utilize sustainable materials and technology. All products and materials will be recyclable, irrigation system will be State of the Art conforming to the Landscape Ordinance (AB1881), native plantings in all non activity areas, lawn areas to be less than 30% of the project area for water conservation, solar lighting for the walkways and park lighting to reduce power consumption, stabilized DG walking paths and exercise station to promote heart healthy actives, universally accessible children play areas, half court basketball for active recreation, prefabricated restroom building, group and individual picnic facilities to promote family activities, public art area, small parking lot, and a aesthetically pleasing streambed (bio filtration system) that will capture all storm water run-off allowing water infiltration in to the subterranean surface of the park.

Mackay Park, Cypress, CA
Southern California Chapter of the American Public Works Association (APWA) 2017 Project of The Year Award
807
Community Parks
Hirsch & Associates, Inc. HAI Landscape Architecture & Planning Client
City of Long Beach, California
Contact
Nancy Villasenor, Project Manager
562-570-3165
Consultants
Landscape Architect (Prime Consultant)
Hirsch & Associates, Inc.

Project Status
Completed September 2021
Project Cost
$2.5 Million
Project Description
HAI provided conceptual design, construction documents and estimates, permitting and construction support for this artificial turf field. The design is
intentional without security fencing, open to the
public. It is an adult size field with youth fields
included with striping. The infill is cork and sand,
ADA access was designed into the project from
existing parking lot and right of way. The existing
trees were protected in place around the perimeter. Boulders were included to prevent vehicular vandals from entering the field, dispersed among
the existing trees. 25 of the boulders are engraved
with unique silhouettes that HAI designed.

El Dorado Park Field
Long Beach, CA
808
Community Parks
Hirsch & Associates, Inc. HAI Landscape Architecture & Planning Client
City of Torrance California
Contact
John Jones
Director, Community Services Department
Consultants
Landscape Architect (Prime Consultant)
Hirsch & Associates, Inc.

Electrical Engineer
IDS Engineering
Project Status
Completed October 2018
Project Cost
Construction Cost $1.3 Million
Project Description
Wilson Park Splash Pad project, designed by HAI, Provides a new amenity to replace a defunct pond within the existing park. The design filled the old pond and included a 1,450sf Splash Pad with recirculation system, pump equipment shed, prefabricated restroom building, refurbished an existing fountain, concrete pad for future outdoor exercise area, relocated area lighting, and minor landscape and irrigation improvements. The splash pad features in grade nozzles and jets with color changing LED lights. The project was designed to allow for modification of splash pad to include above ground spray features as funding becomes available.

Wilson Park Splash Pad
Torrance, CA
809
Community Parks
Hirsch & Associates, Inc. HAI Landscape Architecture & Planning Morgan Park
Baldwin Park, CA
Client
Department of Parks & Recreation
City of Baldwin Park
Contact
Mr. Manual Carrillo
Director of Parks & Recreation
City of Baldwin Park
626-813-5245
Consultants
Landscape Architect (Prime Consultant)
Hirsch & Associates, Inc.

Electrical Engineer
Reedcorp Engineering
Project Status
Completed Summer 2010
Project Cost
$1,200,000
Project Size
2 acres
Project Description
Morgan Park is the busiest park in the City of Baldwin Park and contains their largest community center as well as a senior center. The existing play area was prominently located at the corner entrance to the park was in poor condition. Play equipment was outdated and did not meet current safety standards. A spray/splash feature was in disrepair and was marginally functional. Parking for the facility was not adequately provided.

Park improvements included a new parking lot with bio swales collecting all run off water, total removal and redesign of the play area and public plaza, new entry plaza to the adjacent senior center, 1,400 sf splash pad (recirculating water), separate tot lot and school aged play structures, shade sails, plaza lighting, parking lot lighting and a war memorial. Planter walls feature tiles painted by local children engaging a sense of ownership of the facility by the community. 810
Neighborhood Parks
Hirsch & Associates, Inc. HAI Landscape Architecture & Planning Barnes Park Splash Pad Renovation
Baldwin Park, CA
Client
City of Baldwin Park, California
Contact
Mr. David Lopez, Associate Engineer
(626) 960-4011
Consultants
Landscape Architect (Prime Consultant)
Hirsch & Associates, Inc.

Project Status
Completed August 2014
Project Cost
$750,000
Project Description
Barnes Park was previously renovated and HAI provided
design services for the upgraded park. The completed
project won the CPRS Award of Excellence in 2005 for
Neighborhood Parks. The City was fortunate to receive
grant funding for improvements recently and undertook new renovations of the existing facility. Improvements included a new Splash Pad with recirculation pump and below grade reservoir, removal of sand from play areas and replacement with all rubber surfacing, new outdoor exercise equipment with shade sail, perimeter trail signage providing mileage distance markers and educational information explaining the benefits of exercise, new 60 person group picnic areas with steel shade structure, minor landscape and irrigation modifications to accommodate the new amenities. The
project was constructed this past summer with a Grand
Opening in August 2014. The project is hugely successful and provides area residents active and passive recreation opportunities.
811
Neighborhood Parks
Hirsch & Associates, Inc. HAI Landscape Architecture & Planning Sycamore Canyon Park
Diamond Bar, CA
Client
City of Diamond Bar, California
Contact
Mr. Bob Rose
Community Services Director
(909) 839-7060
Consultants
Landscape Architect (Prime Consultant)
Hirsch & Associates, Inc.

Electrical Engineer
Reedcorp Engineering
Project Status
Phase II Completed - 2007
Project Cost
$1.2 Million
Project Description
Renovation of this park area included the removal of a
telephone pole retaining wall over 12’ high, providing
new Universally Accessible Play Area integrated into the ADA compliant path of travel from the upper park area to the lower park area, shaded picnic area, new hardscape
and retaining wall system, stairs, decorative railings, landscape and irrigation. This portion of work was Phase II of planned renovations for Sycamore Canyon Park. HAI provided master planning services for all phases of design and construction support. Phase I consisted of ball field renovation, new parking facilities and general hardscape and grading improvements, which was completed in 2005.

Phase II was recently completed this past Winter 2007.
812
Community Parks
Hirsch & Associates, Inc. HAI Landscape Architecture & Planning Client
City of Riverside, California
Contact
Randy McDaniel
Principal Park Planner
(951) 826-2000
Consultants
Landscape Architect (Prime Consultant)
Hirsch & Associates, Inc.

Universal Play Consultants
Shane’s Inspiration
Electrical Engineering
Reedcorp Engineering
Project Status
Completed in November 2010
Project Cost
$3.8 Million
Project Size

9.4 Acres
California Park & Recreation Society
2010 Award of Excellence
Category: Community Park
Project Description
The location of the new play area previously contained
a small play area and picnic tables. Fairmount park once contained a small amusement park with a carousel. The
new universally accessible play area was theme to recreate the amusement park atmosphere. A 60’ diameter shade structure at the tot lot replicates the original
carousel. Swings, splash pad, sand play, sensory walls, floor chimes and whimsical play equipment encourage
children and adults of all ages to linger and play.

Fairmount Park
Riverside, CA
813
Community Parks
Hirsch & Associates, Inc. HAI
Landscape Architecture & Planning
Grijalva Community
Park
Orange, CA
Client
City of Orange, California
Consultants
Landscape Architect (Prime Consultant)
Hirsch & Associates, Inc.

Civil Engineer
DMS Consulting Engineers Electrical
Engineer
Reedcorp Engineering
Architect
Crane Architectural
Project Status
Completed
Project Cost
$3.75 Million
Project Size
15-acres
Project Description
Grijalva Community Park features (3) Three regulation sized natural grass soccer fields with Musco sports lights. (2) Two full size basketball courts with lights. (1) One sand volleyball court. Multiple covered group accessible picnic areas. (1) 5,000sf universally accessible tot lot and children’s play area. (1) One 4,000sf site built community building with restroom and concession area. 140 car parking lot with 77 parking stalls along the perimeter of the park. Accessible decomposed granite walking path along the park perimeter. Efficient domestic water smart irrigation system. Environmentally sustainable subterranean storm water retention system.
814
Community Parks
Hirsch & Associates, Inc. HAI Landscape Architecture & Planning Rivera Park
Pico Rivera, CA
Client
City of Pico Rivera, California
Contact
Mr. Ralph Aranda
(562) 400-3428
Consultants
Prime Consultant, Landscape Architects
Hirsch & Associates, Inc.

Architect
Crane Architectural Group
Civil Engineer
DMS Consulting Engineers
Electrical Engineer
Reedcorp Engineering
Project Status
Grand Opening August 16, 2012
Project Cost
$5.7 Million
Project Size

15.8-acres
Awards
Southern California Chapter of the (APWA)
American Public Works Association,
2013 Project of the Year
Southern California Municipal Athletic
Federation (SCMAF),
2013 Outstanding New Recreation Facility Award
Project Description
Rivera Park completed in August 2012 incorporates latest innovation in park design featuring (5) five State of the Art baseball fields and sports lighting, (2) two batting cages, commercial grade concession kitchen and food court,
community center, gymnasium, universally accessible
playground for all children, group picnic and individual picnic areas, a water efficient Smart irrigation system, and an environmentally friendly subterranean storm water retention system.
815
Community Parks
Hirsch & Associates, Inc. HAI Landscape Architecture & Planning Smith Park
Pico Rivera, CA
Client
City of Pico Rivera, California
Contact
Mr. Ralph Aranda
(562) 400-3428
Consultants
Landscape Architect (Prime Consultant)
Hirsch & Associates, Inc.

Civil Engineer
DMS Consulting Engineers
Electrical Engineer
Reedcorp Engineering
Architect
Crane Architectural
Project Status
Grand Opening November 22, 2013
Project Cost
$8 Million
Project Size
17-acres
Project Description
Smith park completed in November 2013 Features a new Artificial Turf football field with soccer overlay, stadium seating accommodating 400 people, (2) Restroom/Concession Buildings, (4) baseball/softball fields, sports lighting, tot lot, school aged play area, picnic seating, enlarged parking lot, recycled water irrigation system, on-site storm water retention system and infiltration system.
816
Firm Pro
file
Hirsch & Associates, Inc. HAI Landscape Architecture & Planning Awards
Garey Avenue
City of Pomona
Southern California Chapter of the American Public
Works Association (APWA)
2018 Traffic, Mobility and Beautification Award
Mackay Park
City of Cypress
Southern California Chapter of the American Public
Works Association (APWA)
2017 Project of The Year Award
Rivera Park
City of Pico Rivera
Southern California Chapter of the American Public
Works Association (APWA)
2013 Project of The Year Award
Southern California Municipal Athletic Federation
(SCMAF)
2013 Outstanding New Recreation Facility Award
Fairmount Park
City of Riverside
California Park & Recreation Society
2010 Award of Excellence
Category: Community Park
Rotary Centennial Park
City of Long Beach
California Park & Recreation Society
2005 Award of Excellence
Category: Specialty Park
Rotary Centennial Park
Fairmount Park
Rivera Park
Mackay Park
Garey Avenue
817
Firm Pro
file
Hirsch & Associates, Inc. HAI Landscape Architecture & Planning Awards
Continued
Barnes Park
City of Baldwin Park
California Park & Recreation Society
2005 Award of Excellence
Category: Neighborhood Park
Cesar Chavez Park
City of Pomona
California Park & Recreation Society
2004 Award of Excellence
2004 Creating Community Award of Distinction
Category: Neighborhood Park
Plaza Park
City of Fullerton
California Park & Recreation Society
2003 Award of Excellence
Category: Community Park
La Cienega Park
City of Beverly Hills
Los Angeles Magazine Best of Issue
2003 Best Public Tennis Courts
California Park & Recreation Society
1991 Special Award of Excellence
1991 Environmental Planning Award
Category: Special Use Facility
California Landscape Contractors Association
1991 Honor Award
United States Tennis Association
1991 Outstanding Tennis Facility
Janss Plaza Renovation & Men’s Soccer Complex
University of California, Los Angeles
California Landscape Contractor Association
1999 Landscape Beautification Award
Plaza Park
La Cienega Park
Janss Plaza Renovation
Cesar Chavez Park
Barnes Park
818
Firm Pro
file
Hirsch & Associates, Inc. HAI Landscape Architecture & Planning Awards
Continued
McCambridge Park
City of Burbank
California Park & Recreation Society
1997 Environmental Planning Award
Category: Community Park
Norma Brandel Gibbs Park
City of Huntington Beach
Sunset Magazine Award
1996 Design Recognition Award
Mission Oaks Community Park
Pleasant Valley Recreation & Park District
California Park & Recreation Society
1996 Environmental Planning Award
Category: Community Park
Citrus Park
City of Anaheim
California Park & Recreation Society
1993 Environmental Planning Award
Category: Neighborhood Park
YMCA Ecke Sports Park
City of Encinitas
California Park & Recreation Society
1992 Environmental Planning Award
Category: Special Use Facility
Mission Oaks Park
McCambridge Park
YMCA Ecke Sports Park
Citrus Park
McCambridge Park
819
Firm Pro
file
Hirsch & Associates, Inc. HAI Landscape Architecture & Planning Awards
Continued
Cerritos Sports Complex
City of Cerritos
California Park & Recreation Society
1990 Award of Merit
Category: Special Use Facility
Landscape Architectural Foundation
1990 Outstanding Project Award
Category: Special Use Facility
Birdsall Park
City of Rialto
California Park & Recreation Society
1989 Environmental Planning Award
Category: Special Use Facility
Kit Carson Adult/Youth Athletic Facility
City of Escondido
California Park & Recreation Society
1988 Award of Merit
Category: Special Use Facility
San Dimas SportsPlex
City of San Dimas
California Park & Recreation Society
1988 Award of Merit
Category: Special Use Facility
Cerritos Sports Complex
Kit Carson Adult/Youth Athletic Facility
Birdsall Park
San Dimas SportsPlex
820
Firm Pro
file
Hirsch & Associates, Inc. HAI Landscape Architecture & Planning Awards
Continued
Rosewood Park
City of Cerritos
California Park & Recreation Society
1987 Environmental Planning Award
Category: Neighborhood Park
Landscape Architectural Foundation
1987 Outstanding Project Award
California Department of Rehabilitation
1987 Special Achievement Award for
Handicap Accessibility
Don Derr Park & Sports Complex
City of Riverside
California Park & Recreation Society
1985 Environmental Planning Award
Category: Special Use Facility
Verdugo Park
City of Glendale
California Park & Recreation Society
1983 Environmental Planning Award
Category: Community Park
Don Derr Park & Sports Complex
Verdugo Park
Rosewood Park
821
Firm Pro
file
Hirsch & Associates, Inc. HAI Landscape Architecture & Planning Charles E. Foley, ASLA
President
Chief Executive Officer
Education
Landscape Architecture, BS
California State Polytechnic University,
Pomona, California
Registration
Licensed Landscape Architect, California #5567
Licensed Landscape Architect, Nevada #948
Experience
Mr. Foley has over 25 years of professional Landscape Architectural and Planning design experience. He has been the Principal in Charge of a wide variety of public park, streetscape, school districts and private development projects. The projects include renovation of existing parks as well as development of new facilities, Brownfield and Landfill sites, Habitat Restoration, irrigation renovation and water efficiency/reduction efforts. As Principal in Charge of each project, he oversees all aspects of development including the public input process from stakeholders, interaction with commissions and council, administers quality control of HAI staff and sub consultants during the design process as well as integral involvement during the construction process. His early field experience in construction prior to becoming a design professional serves clients well with knowledge related to site work and all aspects of park development. The culmination of this experience has served his clients well with creative projects meeting the needs of the stakeholders, completed on time and within budget. Many completed projects he has managed have been awarded merit by the California Park and Recreation Society (CPRS) as well as the American Public Works Association (APWA).

With or without rewards, the completely projects have become treasured assets of communities they serve.

Professional Responsibilities
Project Management
Client Contact & Development
Project Production
Construction Document Preparation
Construction Support
Community Workshops
Public Meetings
Presentations
Affiliations
American Society of Landscape Architects (ASLA)
ASLA Mentor
California Park & Recreation Society
Mackay Park,
City of Cypress
Rotary Centennial Park,
City of Long Beach
Cesar Chavez Park,
City of Pomona
Long Beach Bike & Pedestrian Trail,
City of Long Beach
822
Sycamore Canyon Park,
Diamond Bar, CA
Rio Vista Park
Pico Rivera, CA
Smith Park
Pico Rivera, CA
Professional Responsibilities
Mackay Park,
Cypress, CA
Project Management
Construction Management
Construction Support
Water Audits
Water Management
SWPPP Inspections
Irrigation Consultation
Presentations
Community Workshops
Conceptual Design Preparation
Construction Document Preparation
Affiliations
IA Irrigation Association
California Landscape Contractor Association
California Park & Recreation Society
Wildlife Conservation Society
Louis A. Pompei Memorial Park,
City of Glendora, CA
Janss Plaza Historic Renovation,
UCLA Los Angeles, CA
Education
Construction Technology
College of the Redwoods, Eureka CA Horticulture,
Fullerton College, Fullerton CA
Registration
Licensed Landscape Contractor (C-27) CA #956898
Certified Landscape Irrigation Designer and Auditor, CLIA #84847, Certified SWPPP QSP #28925
Experience
Mr. Hirsch has 34 years of experience in the landscape
design and construction industry. Before joining Hirsch & Associates, Inc. 1998, Mr. Hirsch obtained ten years’ experience working for a General Contractor, installing all aspects of landscape construction.

Mr. Hirsch has continued to increase his capacity at HAI, starting from draftsman to his current title of Vice
President. Accomplishments during his professional
career including Autodesk/AutoCAD certification, certified irrigation designer and certified water auditor, qualified SWPPP practitioner QSP. Mr. Hirsch is a
licensed landscape contractor in the State of California.

Firm
ProFile
14 823
Hirsch & Associates, Inc.

Landscape Architecture & Planning
Greg Thayer
Senior Designer
Education
Landscape Architecture, BS
California State Polytechnic University,
Pomona, California
Registration
Licensed Landscape Architect, in progress, completed 3 of 5 sections.

Experience
Mr. Thayer joined Hirsch and Associates, Inc. in 2022
with years of previous experience having worked in the
landscape construction industry as well as horticultural and multidisciplinary firm in their Landscape Architecture division where he collaborated on projects with
architects, engineers, and environmental planners. He
works closely with clients and sub consultants to
develop various projects from conceptualization
through design development and lastly to construction
documents and support. He has been involved with a
wide range of projects such as Park and Recreation
Facilities, Sports Parks, Commercial Retail Centers, and Streetscape Beautification.

Professional Responsibilities
Construction Document Preparation
Graphic Design/Rendering
Project Production
Construction Support
Community Workshops/Public Meetings
Subconsultant Coordination
Client Contact and Development
Affiliations
American Society of Landscape Architects
New City Park, Adelanto CA
Civic Center Park, Pomona CA
Meadowview Demonstration Garden, City of Pomona CA
Firm
ProFile
824
Firm Profile

JACOB LAURENTOWSKI
Designer
Education
Landscape Architecture, BS
California State Polytechnic University,
Pomona, California
Experience
Mr. Laurentowski joined Hirsch & Associates, Inc. in
2022 while finishing the last year of his BS at Cal Poly Pomona. Upon graduation in 2023, he has been a full-time employee, working diligently to gain experience and expand his repertoire. Since then, he has successfully worked
with clients and sub consultants to move projects from
conceptualization to construction documentation. While Mr.

Laurentowski has spent much of his time in the municipal sphere, heading various park and playground renovations, he has worked on a diversity of projects including: sports fields, commercial retail centers, large-scale habitat irrigation, gateway monument signs, and municipal studies.

Professional Responsibilities
Conceptual Design
Construction Document Preparation
Project Production
Graphic Design/Rendering
Community Outreach/Public Meetings
Client & Subconsultant Contact
Affiliations
American Society of Landscape Architects (ASLA)
Hilda L. Solis Park Renovation Concept
City of Baldwin Park, CA
Labourdette Park Renovation
City of Los Alamitos, CA
Russel C. Paris Playground Renovation Concept
City of Westminster, CA
Jaycee Parkette Renovation Concept
City of Placentia, CA
825
Organizational Chart
City of Palm Desert
Charles Foley, President
Architect of Record
Landscape Architect CA #5567
Rob Deprat PE
Blue Peak Engineering
Civil Engineering
Mark Hirsch, Project Manager
Vice President
Landscape Contractor C956898
Certified Irrigation Auditor 84847
Greg Thayer
Senior Designer
Jacob Laurentowski
Designer
James Corns EE
JCA
Electrical
Engineering
Sean Lin GE
LKGE
Geotechnical Engineer
Techical Drafting Staff
Designers
Tony Hobollah SE
Landmark Structures
Structural Engineering
Note: Per Addendum 1, City shall provide survey, no surveyor on the project team.

HAI can provide survey if needed, Pacific Land Consultants. 826
Robert DePrat, P.E.
1853 Yorba Linda Bl#235
Yorba Linda, Ca. 92886
714-749-3077
[email protected]
California (#60482)
Bachelor of Science, Civil Engineering, UC Irvine
M.B.A. UC Irvine
Professional Experience
Mr. DePrat has over 20 years of professional civil engineering experience serving clients throughout California in a wide range of public parks and private development projects. Blue Peak Engineering has provided civil engineering services to HAI throughout its history including sports parks, roadway design and recreation facilities. Along with his depth of experience, Mr.

DePrat’s success is attributed to his dedication to customer service and maintaining valuable working relationships among clients, contractors and jurisdictional agencies.

JCA Engineering Inc. is dedicated to providing efficiently innovative architectural lighting design services, and state-of-the-art electrical engineering. Projects successfully completed within the last year represent total construction values exceeding thirty million dollars. Those projects encompassed new and renovated educational facilities, efficient public works facilities, religious facilities, active and passive recreational sites, sports complexes, arenas and streetscapes for community revitalization. The principals of this growing design firm offer more than 65 combined years of experience in electrical systems engineering.

We implement new technology to evaluate our design proposals using software such as AutoCAD 2025.

Lighting design incorporates all required Title 24 energy codes, and we are capable of providing all the required Title 24 forms to meet all state requirements.

JCA offers comprehensive experience in government, public works, federal, religious, business, institutional, private and educational facilities electrical system requirements and construction. In addition, JCA provides design expertise in fire alarm, electronic communications, intrusion alarm and video distribution systems.
827
LK Geotechnical Engineering, Inc.
10120 National Boulevard, Los Angeles, CA 90034
Engineer: 626.328.4346; Geologist: 310.866.8977
COMPANY PROFILE:

LK Geotechnical Engineering, Inc. (LKGE) was founded by two experienced professionals, Dr. Sean Lin and Mr.

Mark  Kruger  in  Los  Angeles,  California.    Our  services  include  geotechnical  and  geological  consultation, geotechnical investigation, soil infiltration study for storm water management, laboratory soil testing, field geotechnical inspection, soil compaction testing, and deputy grading inspection in the Greater Los Angeles area.

Dr.  Lin  is  a  California  licensed  Geotechnical  Engineer  (G.E.)  who  has  extensive  geotechnical  knowledge, including soil mechanics, foundation analysis and constructability, geotechnical site stability evaluation, and advanced seismic hazard analysis. In addition, Dr. Lin was an adjunct professor teaching classes in advanced foundation and geotechnical earthquake engineering at California State University, Los Angeles.

Mr.  Kruger  is  a  California  licensed  Engineering  Geologist  (C.E.G.)  who  has  been  practicing  geological investigation and geotechnical inspection since 1997.  His professional specialty includes geological hazard evaluation, hillside geological mapping, groundwater mitigations, earthquake  fault study, and construction consultation and inspection.

Our goal is to provide the straight‐forward professional services that our clients can count on.  Our company’s aim  is  to  deliver  quality  services  in  a  timely  manner,  to  keep  our  client  well‐informed,  and  to  resolve engineering problems in a logically cost‐effective way.

Our  geotechnical  consulting  experience  includes  residential  and  commercial  development,  offices  and warehouses, schools and colleges, health  facilities, and municipal public work projects.  The  following is a selected list of our project experience:
• City of Alhambra Dog Park, Alhambra, CA
• Bright Star Valor Academy High School Sport Field, North Hills, CA • KIPP Academy of Innovation Sport Field, Los Angeles, CA • Everest Value School Classroom Building and Sports Field, Los Angeles, CA • CWC West Vally School Classroom Building and Sports Field, Winnetka, CA • Fillmore Fish Hatchery Feed Bins, Fillmore, CA
• 7301 Broadway Affordable Housing Apartment, Los Angeles, CA • Slauson Marketplace Target Store renovation parking lot LID facilities, Huntington Park, CA • 7‐Eleven Buena Park, Buena Park, CA
• Neighborhood Healthcare parking lot and ADA ramp, Escondido, CA

828
LK Geotechnical Engineering, Inc.
10120 National Boulevard, Los Angeles, CA 90034
Engineer: 626.328.4346; Geologist: 310.866.8977
1 of 1
CHI‐HSIN (SEAN) LIN, Ph.D, P.E., G.E.

PRINCIPAL ENGINEER, VICE PRESIDENT
PROFILE:

Dr. Lin is a California licensed geotechnical engineer (G.E.) who has extensive geotechnical knowledge, including soil mechanics, foundation analysis and constructability, geotechnical site stability evaluation, and advanced seismic hazard analysis. In addition, Dr. Lin is an adjunct professor teaching advanced foundation and geotechnical earthquake engineering classes at California State University, Los Angeles.

Dr. Lin provides consultation and collaborates with client and project design team, conducts/manages field explorations, performs analysis to prepare reports, and reviews reports and plans during the design phase of a project.  During the construction phase, Dr. Lin supervises and manages field inspection activities and laboratory testing, performs QA/QC on inspection and testing.

PROFESSIONAL LICENSES:
2004  Professional Engineer (Civil), No. 67109, State of California 2011  Geotechnical Engineer, No. 2921, State of California City of Los Angeles, Deputy Grading Inspector, No. P041202 EDUCATION:
2002  Ph. D., University of Southern California, Civil Engineering with emphasis on Earthquake Engineering
1997  Master of Science, University of Southern California, Civil Engineering with emphasis on Geotechnical Engineering
1993  Bachelor of Science, Chung Yuan Christian University, Civil Engineering SELECTED PROJECT EXPERIENCE:

MUSEUMS AND PARKS:

City of Santa Monica, Tonga Park, Santa Monica, CA
City of Burbank, 5‐Points Art and Landscape, Burbank, CA City of El Monte, Mary Van Dyke Park Improvement, El Monte, CA Audubon Nature Center at Debs Park, Grading and Slope Restoration, Los Angeles, CA Discovery Science Center Expansion Phase 1, Santa Ana, CA Universal Studio Hollywood, Harry Potter Ride, Universal City, CA Universal Studio Hollywood, Animation Store, Universal City, CA Universal Studio Hollywood, Dreamwork Theater, Universal City, CA Universal Studio Hollywood, Jurassic World Ride, Universal City, CA City of Alhambra Dog Park, Alhambra, CA
829
Creating Award Winning P r o j e c t s
Since 1977
2221 E. Winston Road, Suite A, Anaheim, CA 92806-5540
Phone 714.776.4340 Fax 714.776.4395 www.hailandarch.com LA #5567 Hirsch & Associates, Inc. HAI Landscape Architecture & Planning Hirsch & Associates, Inc. HAI Landscape Architecture & Planning

ORIGINAL
Proposal for Professional Design Services for the
Park and Trailhead Engineering and Design
Improvements for the City of Palm Desert, CA
Hovley Soccer Park
830
Hovley Soccer Park City of Palm Desert
Section 1: Project Summary
The City of Palm Desert is seeking to enhance Hovley Soccer Park through a series of strategic design and construction improvements aimed at improving functionality, safety, and visitor experience. Hirsch and Associates Inc. will be responsible for managing the project from initial public engagement through final construction support, ensuring that the upgrades reflect community needs and align with the city’s quality standards.

The scope of work will be divided into four key phases: public engagement, preliminary planning and conceptual design, construction documentation, and bidding and construction support.

The project will begin with a comprehensive public engagement process to gather input from local residents and Parks and Recreation Committee. Hirsch and Associates Inc. will develop and execute a Public Engagement Plan, host stakeholder and community meetings, and present findings to the City Council and the Parks and Recreation Committee. Feedback from the public will be documented and incorporated into the design process to ensure that the improvements align with community expectations.

During the preliminary planning and conceptual design phase, the consultant will create detailed design options that focus on the following key improvements:

1. Sports Fields:

The existing soccer fields will be upgraded to improve playability and safety. This may include improving turf quality, enhancing drainage systems, and review existing irrigation layout for efficiency and coverage.

2. Playground:

A new playground will be designed to accommodate children of various ages and abilities. The design will focus on providing safe, ADA-compliant play structures with modern equipment and resilient surfacing. Seating areas will be integrated into the playground design to improve comfort for both children and caregivers.

3. Landscape Improvements:

The consultant will design a landscape plan that enhances the park’s aesthetic appeal and supports sustainability. Drought-tolerant plants and efficient irrigation systems will be incorporated to reduce water usage and maintenance costs.

A preliminary cost estimate and project timeline will be prepared as part of the design package to help the city manage resources and expectations effectively.

Once the conceptual design is approved, Hirsch and Associates Inc. will prepare a full set of construction documents, including landscape architectural and civil engineering drawings and technical specifications, The construction documents will cover all aspects of the project, including field improvements, playground installation and landscaping. The consultant will ensure that all plans comply with local building codes and ADA requirements.

During the bidding and construction support phase, Hirsch and Associates Inc. will provide technical assistance, respond to contractor inquiries, and issue addenda as needed. The consultant will attend pre-bid and pre-construction meetings and provide on-site support during construction to ensure that the project is executed according to the approved plans and within budget. 1 831
SECTION 2: Methodology
Hovely Soccer Park City of Palm Desert
HAI will stay in close contact with the City’s Project Manager through weekly or bi-weekly updates and milestone meetings ensuring a coordinated effort. We understand the City’s objective to enhance the community experience by improving Hovley Soccer Park. Our approach will focus on creating a functional, safe, and aesthetically pleasing environment that meets the City’s schedule, operational goals and budget requirements.

Hovley Soccer Park Work Plan
Basic Services. Perform all the necessary professional landscape architectural and engineering services in a timely and professional manner consistent with the standards of the profession.

Project Management. Provide overall project management, conduct a pre-design kickoff meeting with City Staff to confirm objectives and establish a project schedule. Provide bi-weekly progress updates to ensure alignment with City requirements and timelines. Maintain continuous oversight and address and challenges.

City Provided Information. The City shall provide a topographic survey and geotechnical report of the park and all existing documentation it has on file for the improvement area that may include existing utility locations and depths, survey/boundary information, copies of easement documentation, list of agencies having jurisdiction over the project, and contact person for the agency, street improvement plans and storm drain plans. HAI, Hirsch & Associates, Inc will make a good-faith effort to verify the accuracy of such information and utilize it in the preparation of the final working drawings and specifications.

Communication. Participate in consultations and conferences with City Staff and other agencies having jurisdiction over the Project that may be necessary for the completion of the Project. Such consultations and conferences shall continue throughout the project duration. Communication will include a combination of email, telephone, ZOOM and in person meetings at City Hall and/or project site.

Project Feasibility. Provide advice and assistance in determining the feasibility of the Project, analyze the type and quality of materials and construction methods to be selected, and other initial planning matters.

Budget. Use our best judgment in determining the balance between the size, type and quality of construction to achieve a satisfactory solution to maintain the City’s stated budget.

HAI has served as Lead Consultant over the past 47 years on park projects throughout California, Arizona and Nevada. Every project that we undertake includes monitoring and management of our Consulting Fee, Construction Budget and Schedule. HAI provides a monthly invoice to our clients for our completed work. The progress billing contains previous months’ billing as well as total contract value and associated completion percentage. The progress billing provides a comprehensive account of where our progress is related to the total value of the contract.

Quality Control/Quality Assurance
HAI has developed a design quality process for the presentation of deliverables that is consistent and replicable for each deliverable document. Each formal submittal prepared by HAI and team members shall be; • Reviewed by independent technical staff of the discipline involved. • Reviewed for coordination and possible interferences by design staff of other disciplines involved. • Checked by Project Manager for design certification and/or certifies comments for revisions. • Certified that all comments have been incorporated, checked and back checked in accordance • Drawings stamped for internal audit as reviewed, checked and back checked. Once all three quality control checks have been completed, documents are ready for delivery.

Check and Certification of reviewed drawings is undertaken by State Licensed Landscape Architects and Engineers.
2 832
SECTION 2: Methodology
Hovely Soccer Park City of Palm Desert
Administration
 This task includes the project management services including the requirements for meeting documentation, project schedules, progress reports, invoicing, and administration of Consultant work.  A kickoff meeting shall be scheduled within the Task Order/Notice to proceed to review Project objectives and requirements, receive initial information from City/Utilities, establish the communication plan and protocols, baseline delivery schedule, and address other issues as necessary to ensure successful Project initiation.

Deliverables: Project Schedule, Progress Reports, Meeting Notes and invoices.

End Section 2
SECTION 3: SCOPE OF WORK
Scope of Work - Site Design (HAI-Blue Peak)
Community Meeting
 Meet with residents, sports organizations, Park and Recreation Committee and other stakeholders that can provide input on the community needs.
 Develop a Public Engagement Plan based on input from the community and user groups  Work with City project team to create the framework for the Conceptual Design Conceptual Design
 Review existing data, such as as-builts and record drawings.  Photo document and conduct site analysis to evaluate the opportunities and constraints of the site.  Synthesize data received and compare with site analysis findings to finalize site assessments and prepare the analysis report. Review report with City Staff, revise as necessary.  Obtain and review utility information within the public right of way and park site.  Develop provisions to accommodate existing and new utility facilities (e.g., maintained in place, removed, adjusted, abandoned, or installed).
 Effectively identify utility locations and resolve conflicts on proposed plans to keep the project on schedule.
 Prepare Design Development plans utilizing the formal survey provided by the city as the base sheet.

The design shall be predicted upon the conceptual plan provided by the City. Verify the preliminary plan horizontal and vertical control is achievable. Provide design alternates as needed to site the proposed required amenities is relationship with existing grades and ADA accessible code requirements.
 Prepare a preliminary construction cost estimate. Set budgets for proposed amenities.  Obtain quotes/proposals of differing manufacturers for the site amenities.  Prepare color site plan renderings illustrating the design and material selection.  Meet with City Staff to review design concepts and estimate. Revise as needed based on input received.  Provide design presentation of revised Design Development Drawings to City Staff for review and comment.

Deliverables: Preliminary Design Development Drawings and estimates (AutoCAD version compatible with City and PDF). Amenities exhibit featuring photos of proposed materials and Presentation (PowerPoint and PDF). Preliminary Grading Plan (AutoCAD version compatible with City and PDF).

Meeting Minutes and Supporting Documentation).
3 833
SECTION 3: SCOPE OF WORK
Hovley Soccer Park City of Palm Desert
Scope of Work - Site Design (HAI-Blue Peak)
Construction Documents
Includes monthly status meetings, reports of work, schedule updates and meeting minutes of all communication and action items.

HAI is responsible for developing and assembling Contract Construction Bid Documents (“Bid Documents”) for advertisement and bidding the project for construction. The Bid Documents shall include all necessary Civil, site and landscaping/irrigation to be constructed, construction plans and supporting documentation for a complete biddable set. Furthermore, HAI shall provide Technical Specifications and Cost Estimates associated with the design plans. All Bid Documents shall be prepared and stamped by a CA licensed Landscape Architect and Professional Civil Engineer with the appropriate license per each discipline of work. The design shall comply with all latest applicable codes, guidelines, and standards. Plans to be drawn at 1”=20’ and include the following:
• Title/Index Sheet
• Demolition/Protection Plan
• Site/Grading and Drainage Plan
• Erosion Control Plan
• Construction Plans and Details, notes
• Landscape Plans, Details and notes
• Irrigation Plans, Details and notes
• Technical Specifications – City shall prepare the boiler plate specifications • Probable Construction Cost Estimates with back-up/support information on quantities and unit prices.

Scope of Work – Civil Engineering Blue Peak

SCOPE OF WORK
Task 1.1: Storm Water Pollution Prevention Plan (SWPPP) / Notice of Intent (NOI) Based on the requirements of the State Water Quality Resources Control Board’s General Permit, a Notice of Intent and a Storm Water Pollution Prevention Plan will be prepared for the site. • Blue Peak will research the necessary data to accurately complete the Application for Notice of Intent (NOI) and it will be submitted to the State Water Resources Control Board.
• Based on site conditions and proposed construction a SWPPP will be prepared to address the specific site water quality concerns.
• The SWPPP will be prepared under the direction of a Qualified SWPPP Developer (QSD) as certified by the California Stormwater Quality Association.

Task 1.2: Water Quality Management Plan (WQMP)
The WQMP will provide guidelines for project-specific post-construction Best Management Practices (BMPs) and for regional and sub-regional Source Control BMPs and Structural BMPs to address management of stormwater runoff quantity and quality to protect the nearby receiving waters. • Address Site Design BMPs.
• Incorporate the applicable Routine Source and Structural Control BMPs. • Describe the long-term operation and maintenance requirements for Structural Control BMPs. 4 834
SECTION 3: SCOPE OF WORK
Hovley Soccer Park City of Palm Desert
• Identify the entity that will be responsible for long-term operation, maintenance, repair and/or replacement of the structural BMPS and the training that qualifies them.
• Provide a copy of the forms to be used in conducting maintenance and inspection activities. • The WQMP will comply with the requirements of the City of Palm Desert Stormwater Program. • The City must provide recommended infiltration rates from the City’s geotechnical engineer based on testing done at the job site. Testing must be in conformance with standards set forth by the agency having jurisdiction. These rates must be included in the final geotechnical report.

Task 1.3: Precise Grading Plan Review
Blue Peak Engineering will provide a civil engineering review of the precise grading plans, which will include the following:
• Two (2) civil engineering reviews will be completed with redline comments. • The final set of plans will be stamped and signed by a Registered Civil Engineer for final approval with the City of Palm Desert. All comments from Blue Peak Engineering must be addressed prior to the stamping of the plans.

The Plan format, standard construction notes, and sheet borders shall be commensurate with City standards.

Deliverables:
• Prepare 60%, 90%, and 100% design submissions for City review. (AutoCAD version compatible with City and PDF)
• 60%, 90%,100% Contract Technical Specifications (Word and PDF) • 60%, 90%,100% Engineers Estimate (Excel and PDF)
• Ensure that the specifications comply with the Standard Specifications for Public Works Construction (“Greenbook”).
• Supporting Design Documentation/Calculations (Word, Excel, and PDF) All applicable plans, technical specifications and construction cost estimates shall conform to City templates.

All submittals shall be thoroughly checked as part of the Consultants QA/QC program, inclusive of any independent plan check process. All redlines shall be attached to each re-submittal with a summary matrix of comments, edits, and responses provided noting where the revisions have been incorporated into the specific deliverable as necessary.
5 835
Hovley Soccer Park City of Palm Desert
SECTION 3: SCOPE OF WORK

FINAL DESIGN DELIVERABLE FORMAT
From Plan Check Review Comments
Final Bid Package Submittal (100% PS&E):
• Full Construction Bid Ready Plans (1 PDF file for City duplication and printing and Autocad files) • Specifications (PDF and DOC file formats)
• Project Cost Estimate (Excel file, and PDF)
• All Supporting Documents(PDF and/or DOC)
Bidding
HAI team shall be available throughout the advertisement and bidding period to provide technical assistance to the City. This requires assistance with bidder's inquiries, preparation of addenda, and attendance at the pre-bid field meeting. Bidding procedures shall be the responsibility of the City. • Respond to Requests for Information (RFIs) during the project advertisement period, and log questions and responses.
• Prepare project addenda at the direction of the City. • Attend the pre-construction meeting, job walk
Deliverables: pre-bid meeting notes, comments on requests for information, plan/specification revisions, addendums to bid
Construction Support
• Prepare the Pre-Construction meeting agenda for the City’s review. The following items will be reviewed at the Pre-Construction meeting:
-Plans, Specifications and Inspection Process
-Submittals and the approval process
-City and State Funds
-Impacted Utilities, Coordination with the City, Departments, and other impacted agencies
-Coordination with schools, residents, businesses and similar entities -Public Notices, construction schedule, and traffic control (if needed) -Encroachment Permits, if any
-Agreed communication
-Weekly Statement of Working Day Reports, contract time and progress meetings -Contract Change Order (CCO) process
-Final project walkthrough, punch list items, preparation of as-built drawings and project acceptance • Conduct preconstruction meeting with City and Contractor. Prepare meeting minutes and distribute to all parties.
• Review contractor payment requests and provide City opinion of work completed. • Coordinate with City project manager, city staff and inspector as necessary during construction. • Review contractor prepared construction schedule and verify adherence during the life of the project.

Update schedule and progress verification as field operations continue and change original schedule. • Review and approve product submittals and shop drawings in accordance with construction documents. • Attend on-site project meetings to review work of the contractor. Prepare written reports of meetings for distribution to all parties. Document what work is taking place and compare to project schedule. Photo document and include in project log of meetings and minutes. • Coordinate with all parties by telephone, fax and e-mail as necessary. • Contract Change Orders (CCOs) may be requested by the City, Contractor or design engineer. When a proposed change is requested, HAI will determine the need for the change, check for conformance to standards, consider other remedies, method of compensation, impact on contract time, estimate of cost, and the likelihood of final approval.
6 836
SECTION 3: SCOPE OF WORK
Hovely Soccer Park City of Palm Desert
• If HAI finds the proposed change is reasonable, a proposed change order file will be established.

Documents prepared by HAI regarding the Change Order will be given to the Contractor for pricing. HAI will review and evaluate the Contractor’s CCO proposal. Based on the review, HAI will provide a recommendation to the City.
• Observe and approve all soil preparation material, planting methods, and finish grading prior to planting.

Visit local Nursery and tag plant material for project
• Observe the inspection of the installation of all landscape and irrigation equipment. • Respond to contractor’s Request for Information (RFI’s) and other questions during project construction. • Conduct substantial completion review and Contractor and prepare punch list. Review and approve punch list items upon their completion.
• Review and approve all contractor supplied closeout items, manuals and charts for irrigation system, lighting and building as specified in the contract specifications.

Deliverables: meeting notes, comments on requests for information, plan/specification revisions, punch lists and items of correction
Prepare Record Drawings (As-Builts)
• Within 20 days following the completion and acceptance of the project, furnish the City with a complete set of revised original drawings showing as-built conditions. The as-built plans shall be prepared based on asbuilt information provided by the City’s Construction Manager and the Contractor Deliverables: As-Builts in PDF Format.

Exclusions and Assumptions
• City will provide the Title Report for the subject property for our use in establishing existing easements and boundary.
• City will provide a topographic survey in Autocad format for the improvement project. • City will provide a geotechnical report with infiltration and soils analysis information for the improvement project.
• The City will pay all costs for printing and shipping.

End Section 3
7 837
Creating Award Winning P r o j e c t s
Since 1977
2221 E. Winston Road, Suite A, Anaheim, CA 92806-5540
Phone 714.776.4340 Fax 714.776.4395 www.hailandarch.com LA #5567 Hirsch & Associates, Inc. HAI Landscape Architecture & Planning Hirsch & Associates, Inc. HAI Landscape Architecture & Planning

ORIGINAL
Proposal for Professional Design Services for the Park
and Trailhead Engineering and Design
Improvements for the City of Palm Desert, CA
Homme Adams Park
838
Homme Adams Park City of Palm Desert
SECTION 1: Project Summary
The City of Palm Desert is seeking to enhance Homme Adams Park through a series of targeted design and construction improvements aimed at increasing functionality, comfort, and visitor experience.

Hirsch and Associates Inc. will oversee the project from public engagement through final construction support, ensuring that the park upgrades align with the community’s needs and the city’s quality standards. Homme Adams Park serves as a key recreational facility in the city, providing green space, walking trails, and gathering areas for residents and visitors.

The scope of work will be divided into four key phases: public engagement, preliminary planning and conceptual design, construction documentation, and bidding and construction support.

The project will begin with a public engagement process to gather input from local residents and park users to better understand their needs and priorities. The consultant will develop and execute a Public Engagement Plan, host community meetings and stakeholder sessions, and present findings to the City Council and the Parks and Recreation Committee. Feedback from the community will be documented and incorporated into the final design to ensure that the park upgrades reflect the community’s expectations.

During the preliminary planning and conceptual design phase, the consultant will create detailed design plans focused on the following key improvements:

1. Parking:

The existing parking area will be assessed to improve traffic flow and increase capacity where feasible.

Hirsch and Associates Inc. will assess the need for additional parking spaces and ADA-compliant access routes.

2. Shade Structure:

A new shade structure will be designed and installed to provide relief from the sun and improve visitor comfort. The structure will be strategically placed near key park amenities such as seating areas and playgrounds to maximize its benefit.

3. Restroom Facilities:

The project will include the coordination and installation of modern prefabricated restroom facilities that meet ADA accessibility standards. The restroom design will focus on durability, easy maintenance, and user comfort.

4. Park Furnishings:

Existing park furnishings such as benches, picnic tables, trash receptacles, and water fountains will be assessed for condition and functionality. Worn or outdated furnishings will be replaced with modern, durable alternatives that match the park’s overall design aesthetic.

A preliminary cost estimate and project timeline will be prepared as part of the design package to help the city manage resources and expectations effectively.

Once the conceptual design is approved, the consultant will prepare a full set of construction documents, including technical specifications. The construction documents will cover all aspects of the project, including parking upgrades, shade structure installation, restroom construction, and furnishing replacements. All designs will comply with local building codes and ADA requirements.

During the bidding and construction support phase, the consultant will provide technical assistance, respond to contractor inquiries, and issue addenda as needed. The consultant will attend pre-bid and preconstruction meetings and provide on-site support during construction to ensure that the project is executed according to the approved plans and within budget.

The completed project will transform Homme Adams Park into a more comfortable and functional space for the community. The improved parking, shade structure, modern restroom facilities, and upgraded park furnishings will create a more inviting and user-friendly environment, reinforcing Palm Desert’s commitment to providing high-quality public amenities.
1 839
Homme Adams Park City of Palm Desert
SECTION 2: Methodology
HAI will stay in close contact with the City’s Project Manager through weekly or bi-weekly updates and milestone meetings ensuring a coordinated effort. We understand the City’s objective to enhance the community experience by improving Homme Adams Park. Our approach will focus on creating a functional, safe, and aesthetically pleasing environment that meets the City’s schedule, operational goals and budget requirements.

Work Plan
Basic Services. Perform all the necessary professional landscape architectural and engineering services in a timely and professional manner consistent with the standards of the profession.

Project Management. Provide overall project management, conduct a pre-design kickoff meeting with City Staff to confirm objectives and establish a project schedule. Provide bi-weekly progress updates to ensure alignment with City requirements and timelines. Maintain continuous oversight and address and challenges.

City Provided Information. The City shall provide the topographical survey in Autocad format and all existing documentation it has on file for the improvement area that may include existing utility locations and depths, survey/boundary information, copies of easement documentation, list of agencies having jurisdiction over the project, and contact person for the agency, street improvement plans and storm drain plans. HAI, Hirsch & Associates, Inc will make a good-faith effort to verify the accuracy of such information and utilize it in the preparation of the final working drawings and specifications.

Communication. Participate in consultations and conferences with City Staff and other agencies having jurisdiction over the Project that may be necessary for the completion of the Project. Such consultations and conferences shall continue throughout the project duration. Communication will include a combination of email, telephone, ZOOM and in person meetings at City Hall and/or project site.

Project Feasibility. Provide advice and assistance in determining the feasibility of the Project, analyze the type and quality of materials and construction methods to be selected, and other initial planning matters.

Budget. Use our best judgment in determining the balance between the size, type and quality of construction to achieve a satisfactory solution to maintain the City’s stated budget.

HAI has served as Lead Consultant over the past 47 years on park projects throughout California, Arizona and Nevada. Every project that we undertake includes monitoring and management of our Consulting Fee, Construction Budget and Schedule. HAI provides a monthly invoice to our clients for our completed work. The progress billing contains previous months’ billing as well as total contract value and associated completion percentage. The progress billing provides a comprehensive account of where our progress is related to the total value of the contract.

Quality Control/Quality Assurance
HAI has developed a design quality process for the presentation of deliverables that is consistent and replicable for each deliverable document. Each formal submittal prepared by HAI and team members shall be; • Reviewed by independent technical staff of the discipline involved. • Reviewed for coordination and possible interferences by design staff of other disciplines involved. • Checked by Project Manager for design certification and/or certifies comments for revisions. • Certified that all comments have been incorporated, checked and back checked in accordance • Drawings stamped for internal audit as reviewed, checked and back checked. Once all three quality control checks have been completed, documents are ready for delivery.

Check and Certification of reviewed drawings is undertaken by State Licensed Landscape Architects and Engineers.
2 840
Homme Adams Park City of Palm Desert
SECTION 2: Methodology
Administration
 This task includes the project management services including the requirements for meeting documentation, project schedules, progress reports, invoicing, and administration of Consultant work.  A kickoff meeting shall be scheduled within the Task Order/Notice to proceed to review Project objectives and requirements, receive initial information from City/Utilities, establish the communication plan and protocols, baseline delivery schedule, and address other issues as necessary to ensure successful Project initiation.

Deliverables: Project Schedule, Progress Reports, Meeting Notes and invoices.

END SECTION 2:

SECTION 3: Scope of Work
Scope of Work - Site Design (HAI-JCA-Blue Peak)
Conceptual Design
 Review existing data, such as as-builts and record drawings.  Photo document and conduct site analysis to evaluate the opportunities and constraints of the site.  Conduct a site visit to record existing conditions of the improvement area such as curbs & gutters, sidewalks, walkways and ramps, light poles, fences and walls, drainage inlets, visible above ground utility installations, trees, etc.
 Synthesize data received and compare with site analysis findings to finalize site assessments and prepare the analysis report. Review report with City Staff, revise as necessary.  Obtain and review utility information within the public right of way and park site.  Develop provisions to accommodate existing and new utility facilities (e.g., maintained in place, removed, adjusted, abandoned, or installed).
 Effectively identify utility locations and resolve conflicts on proposed plans to keep the project on schedule.
 Undertake preliminary investigation with SCE to determine the existing power supply and adequacy to service proposed improvements.
 Prepare Design Development plans utilizing the city provided survey as the base sheet. The design shall be predicted upon the conceptual plan approved by the City.  Prepare a preliminary construction cost estimate. Set budgets for proposed amenities.  Obtain quotes/proposals of differing manufacturers for the site amenities.  Prepare color site plan renderings illustrating the design and material selection.  Prepare a geotechnical report that includes infiltration and soil preparation recommendations.  Meet with City Staff to review design concepts and estimate. Revise as needed based on input received.  Provide design presentation of revised Design Development Drawings to City Staff for review and comment.

Deliverables: Preliminary Design Development Drawings and estimates (AutoCAD version compatible with City and PDF). Amenities exhibit featuring photos of proposed materials and Presentation (PowerPoint and PDF). Site Survey (AutoCAD version compatible with City and PDF). Preliminary Grading Plan (AutoCAD version compatible with City and PDF). Meeting Minutes and Supporting Documentation)
3 841
Homme Adams Park City of Palm Desert
SECTION 3: Scope of Work
Scope of Work - Site Design (HAI-JCA-Blue Peak)
Construction Documents
Includes monthly status meetings, reports of work, schedule updates and meeting minutes of all communication and action items.

HAI is responsible for developing and assembling Contract Construction Bid Documents (“Bid Documents”) for advertisement and bidding the Project for construction. The Bid Documents shall include all necessary Civil, electrical, site and site structural and Landscaping/irrigation to be constructed, Construction Plans and supporting documentation for a complete biddable set. Furthermore, HAI shall provide Technical Specifications and Cost Estimates associated with the design plans. All Bid Documents shall be prepared and stamped by a CA licensed Landscape Architect and Professional Engineer with the appropriate license per each discipline of work. The design shall comply with all latest applicable codes, guidelines, and standards. Plans to be drawn at 1”=20’ and include the following:
• Title/Index Sheet
• Demolition/Protection Plan
• Site/Grading and Drainage Plan
• Erosion Control Plan
• Construction Plans and Details, notes
• Landscape Plans, Details and notes
• Irrigation Plans, Details and notes
• Site Electrical plans, specifications, notes and calculations. • Shade structure plans and details (shade structure company to provide structural calculations) • Technical Specifications – City shall prepare the boiler plate specifications • Probable Construction Cost Estimates with back-up/support information on quantities and unit prices.

Scope of Work – Electrical Engineering (JCA)
• One (1) site visit to verify existing power panel and ability to provide power for prefabricated restroom. • Electrical utilities to the prefabricated restroom.
• Conference call design meetings and or email correspondence as required with the Hirsch project team throughout the design phase.
• Electrical load calculations
• Title 24 calculations and forms
• Prepare electrical documents suitable for plan check, bidding and construction • Single line, panel schedules, diagrams and details
• Specifications to be included with electrical drawings • Construction Administration:
• Review electrical shop drawings
• Respond to Electrical Contractor RFI
4 842
Homme Adams Park City of Palm Desert
SECTION 3: Scope of Work
Scope of Work – Civil Engineering Blue Peak

SCOPE OF WORK
Task 1.1: Storm Water Pollution Prevention Plan (SWPPP) / Notice of Intent (NOI) Based on the requirements of the State Water Quality Resources Control Board’s General Permit, a Notice of Intent and a Storm Water Pollution Prevention Plan will be prepared for the site. • We will research the necessary data to accurately complete the Application for Notice of Intent (NOI) and it will be submitted to the State Water Resources Control Board. • Based on site conditions and proposed construction a SWPPP will be prepared to address the specific site water quality concerns.
• The SWPPP will be prepared under the direction of a Qualified SWPPP Developer (QSD) as certified by the California Stormwater Quality Association.

Task 1.2: Water Quality Management Plan (WQMP)
The WQMP will provide guidelines for project-specific post-construction Best Management Practices (BMPs) and for regional and sub-regional Source Control BMPs and Structural BMPs to address management of stormwater runoff quantity and quality to protect the nearby receiving waters. • Address Site Design BMPs.
• Incorporate the applicable Routine Source and Structural Control BMPs. • Describe the long-term operation and maintenance requirements for Structural Control BMPs. • Identify the entity that will be responsible for long-term operation, maintenance, repair and/or replacement of the structural BMPS and the training that qualifies them.
• Provide a copy of the forms to be used in conducting maintenance and inspection activities. • The WQMP will comply with the requirements of the City of Palm Desert Stormwater Program. • You must provide recommended infiltration rates from your geotechnical engineer based on testing done at the job site. Testing must be in conformance with standards set forth by the agency having jurisdiction. These rates must be included in the final geotechnical report.

Task 1.3: Precise Grading Plan Review
Blue Peak Engineering will provide a civil engineering review of the precise grading plans, which will include the following:
• Two (2) civil engineering reviews will be completed with redline comments. • The final set of plans will be stamped and signed by a Registered Civil Engineer for final approval with the City of Palm Desert. All comments from Blue Peak Engineering must be addressed prior to the stamping of the plans.

The Plan format, standard construction notes, and sheet borders shall be commensurate with City standards.

Deliverables:
• Prepare 60%, 90%, and 100% design submissions for City review. (AutoCAD version compatible with City and PDF)
• 60%, 90%,100% Contract Technical Specifications (Word and PDF) • 60%, 90%,100% Engineers Estimate (Excel and PDF)
• Ensure that the specifications comply with the Standard Specifications for Public Works Construction (“Greenbook”).
• Supporting Design Documentation/Calculations (Word, Excel, and PDF) 5 843
Homme Adams Park City of Palm Desert
SECTION 3: Scope of Work
All applicable plans, technical specifications and construction cost estimates shall conform to City templates. All submittals shall be thoroughly checked as part of the Consultants QA/QC program, inclusive of any independent plan check process. All redlines shall be attached to each re-submittal with a summary matrix of comments, edits, and responses provided noting where the revisions have been incorporated into the specific deliverable as necessary.

FINAL DESIGN DELIVERABLE FORMAT
From Plan Check Review Comments
Final Bid Package Submittal (100% PS&E):
• Full Construction Bid Ready Plans (1 PDF file for City duplication and printing and Autocad files) • Specifications (PDF and DOC file formats)
• Project Cost Estimate (Excel file, and PDF)
• All Supporting Documents(PDF and/or DOC)
Bidding
HAI team shall be available throughout the advertisement and bidding period to provide technical assistance to the City. This requires assistance with bidder's inquiries, preparation of addenda, and attendance at the pre-bid field meeting. Bidding procedures shall be the responsibility of the City. • Respond to Requests for Information (RFIs) during the project advertisement period, and log questions and responses.
• Prepare project addenda at the direction of the City. • Attend the pre-construction meeting, job walk
Deliverables: pre-bid meeting notes, comments on requests for information, plan/specification revisions, addendums to bid
Construction Support
• Prepare the Pre-Construction meeting agenda for the City’s review. The following items will be reviewed at the Pre-Construction meeting:
-Plans, Specifications and Inspection Process
-Submittals and the approval process
-City and State Funds
-Impacted Utilities, Coordination with the City, Departments, and other impacted agencies
-Coordination with schools, residents, businesses and similar entities -Public Notices, construction schedule, and traffic control (if needed) -Encroachment Permits, if any
-Agreed communication
-Weekly Statement of Working Day Reports, contract time and progress meetings -Contract Change Order (CCO) process
-Final project walkthrough, punch list items, preparation of as-built drawings and project acceptance • Conduct preconstruction meeting with City and Contractor. Prepare meeting minutes and distribute to all parties.
• Review contractor payment requests and provide City opinion of work completed. • Coordinate with City project manager, city staff and inspector as necessary during construction. • Review contractor prepared construction schedule and verify adherence during the life of the project.

Update schedule and progress verification as field operations continue and change original schedule. • Review and approve product submittals and shop drawings in accordance with construction documents. 6 844
Homme Adams Park City of Palm Desert
SECTION 3: Scope of Work
• Attend on-site project meetings to review work of the contractor. Prepare written reports of meetings for distribution to all parties. Document what work is taking place and compare to project schedule. Photo document and include in project log of meetings and minutes. • Coordinate with all parties by telephone, fax and e-mail as necessary. • Contract Change Orders (CCOs) may be requested by the City, Contractor or design engineer. When a proposed change is requested, HAI will determine the need for the change, check for conformance to standards, consider other remedies, method of compensation, impact on contract time, estimate of cost, and the likelihood of final approval.
• If HAI finds the proposed change is reasonable, a proposed change order file will be established.

Documents prepared by HAI regarding the Change Order will be given to the Contractor for pricing. HAI will review and evaluate the Contractor’s CCO proposal. Based on the review, HAI will provide a recommendation to the City.
• Observe and approve all soil preparation material, planting methods, and finish grading prior to planting.

Visit local Nursery and tag plant material for project
• Observe the inspection of the installation of all landscape and irrigation equipment. • Respond to contractor’s Request for Information (RFI’s) and other questions during project construction. • Conduct substantial completion review and Contractor and prepare punch list. Review and approve punch list items upon their completion.
• Review and approve all contractor supplied closeout items, manuals and charts for irrigation system, lighting and building as specified in the contract specifications.

Deliverables: meeting notes, comments on requests for information, plan/specification revisions, punch lists and items of correction
Prepare Record Drawings (As-Builts)
• Within 20 days following the completion and acceptance of the project, furnish the City with a complete set of revised original drawings showing as-built conditions. The as-built plans shall be prepared based on as-built information provided by the City’s Construction Manager and the Contractor Deliverables: As-Builts in PDF Format.

Exclusions and Assumptions
• City will provide the Title Report for the subject property for our use in establishing existing easements and boundary.
• It is assumed that electrical utilities suitable for supply of new prefabricated restroom are existing on the park site.
• The City will pay all costs for printing and shipping 7 845
Creating Award Winning P r o j e c t s
Since 1977
2221 E. Winston Road, Suite A, Anaheim, CA 92806-5540
Phone 714.776.4340 Fax 714.776.4395 www.hailandarch.com LA #5567 Hirsch & Associates, Inc. HAI Landscape Architecture & Planning Hirsch & Associates, Inc. HAI Landscape Architecture & Planning

ORIGINAL
Proposal for Professional Design Services for the Park
and Trailhead Engineering and Design
Improvements for the City of Palm Desert, CA
University Park
846
University Park City of Palm Desert
SECTION 1: University Park-Project Summary
The City of Palm Desert is planning a significant improvement project at University Park to enhance its functionality, accessibility, and overall visitor experience. University Park can serve as an important recreational space for the local community, providing opportunities for play, relaxation, and social interaction.

The proposed playground improvements reflect the city’s ongoing commitment to maintaining high-quality public spaces that meet the evolving needs of its residents and visitors.

The project will focus on upgrading the park’s playground facilities to provide a safe, modern, and inclusive play environment for children of all ages and abilities. Hirsch and Associates Inc. will oversee the project from the initial planning and public engagement phase through final construction, ensuring that the improvements align with the city’s standards for design and sustainability while reflecting the needs and preferences of the community.

Project Objectives
The primary objectives of the University Park improvement project are to:
• Upgrade Playground Facilities: Design and install a new, ADA-compliant playground with modern play structures, safety surfacing, and interactive elements to support creative and physical play. • Themes and Features: Discuss options with the community and city project team. • Enhance Safety and Accessibility: Improve access to the playground and into the surrounding park by ensuring compliance with ADA standards.
• Improve Aesthetic Appeal: The playground will feature a themed play environment that reflects the unique character of Palm Desert.
• Create a Family-Friendly Environment: Ensure that the playground and surrounding amenities are designed to accommodate visitors, with adequate seating, shade, and rest areas.

Community Meetings
Community input will be central to shaping the design, theme and features of the new playground at University Park. Hirsch and Associates Inc. will develop and implement a Public Engagement Plan to gather feedback through the following methods:
• Initial Community Meeting: Introduce the project to residents and key stakeholders, outline project goals, and gather initial feedback. Discuss playground themes and design concepts, offer suggestions for playground features and layouts.
• Preliminary Design Discussion: Present early design options to the city project team and city officials for feedback and refinement before moving forward with final plans. • City Council and Parks and Recreation Committee Presentations: Provide progress updates and secure approval based on community feedback and design refinements.

Upon completion, the upgraded University Park playground will provide a safer, more engaging, and familyfriendly environment for Palm Desert residents and visitors. The themed play environment will spark imagination and creative play while offering a visually appealing and culturally relevant addition to the city’s park system. The improvements will reflect the city’s commitment to creating high-quality recreational spaces that support healthy and active lifestyles while fostering a sense of community. 1 847
University Park City of Palm Desert
SECTION 2: University Park-Methodology
HAI will stay in close contact with the City’s Project Manager through weekly or bi-weekly updates and milestone meetings ensuring a coordinated effort. We understand the City’s objective to enhance the community experience by improving University Park Playground. Our approach will focus on creating a functional, safe, and aesthetically pleasing environment that meets the City’s schedule, operational goals and budget requirements.

Work Plan
Basic Services. Perform all the necessary professional landscape architectural and engineering services in a timely and professional manner consistent with the standards of the profession.

Project Management. Provide overall project management, conduct a pre-design kickoff meeting with City Staff to confirm objectives and establish a project schedule. Provide bi-weekly progress updates to ensure alignment with City requirements and timelines. Maintain continuous oversight and address and challenges.

City Provided Information. The City shall provide the topographical survey in Autocad format and all existing documentation it has on file for the improvement area that may include existing utility locations and depths, survey/boundary information, copies of easement documentation, list of agencies having jurisdiction over the project, and contact person for the agency, street improvement plans and storm drain plans. HAI, Hirsch & Associates, Inc will make a good-faith effort to verify the accuracy of such information and utilize it in the preparation of the final working drawings and specifications.

Communication. Participate in consultations and conferences with City Staff and other agencies having jurisdiction over the Project that may be necessary for the completion of the Project. Such consultations and conferences shall continue throughout the project duration. Communication will include a combination of email, telephone, ZOOM and in person meetings at City Hall and/or project site.

Project Feasibility. Provide advice and assistance in determining the feasibility of the Project, analyze the type and quality of materials and construction methods to be selected, and other initial planning matters.

Budget. Use our best judgment in determining the balance between the size, type and quality of construction to achieve a satisfactory solution to maintain the City’s stated budget.

HAI has served as Lead Consultant over the past 47 years on park projects throughout California, Arizona and Nevada. Every project that we undertake includes monitoring and management of our Consulting Fee, Construction Budget and Schedule. HAI provides a monthly invoice to our clients for our completed work. The progress billing contains previous months’ billing as well as total contract value and associated completion percentage. The progress billing provides a comprehensive account of where our progress is related to the total value of the contract.

Quality Control/Quality Assurance
HAI has developed a design quality process for the presentation of deliverables that is consistent and replicable for each deliverable document. Each formal submittal prepared by HAI and team members shall be; • Reviewed by independent technical staff of the discipline involved. • Reviewed for coordination and possible interferences by design staff of other disciplines involved. • Checked by Project Manager for design certification and/or certifies comments for revisions. • Certified that all comments have been incorporated, checked and back checked in accordance • Drawings stamped for internal audit as reviewed, checked and back checked. Once all three quality control checks have been completed, documents are ready for delivery.

Check and Certification of reviewed drawings is undertaken by State Licensed Landscape Architects and Engineers.
2 848
University Park City of Palm Desert
SECTION 2: University Park-Methodology
Administration
 This task includes the project management services including the requirements for meeting documentation, project schedules, progress reports, invoicing, and administration of Consultant work.  A kickoff meeting shall be scheduled within the Task Order/Notice to proceed to review Project objectives and requirements, receive initial information from City/Utilities, establish the communication plan and protocols, baseline delivery schedule, and address other issues as necessary to ensure successful Project initiation.

Deliverables: Project Schedule, Progress Reports, Meeting Notes and invoices.

END SECTION 2:

SECTION 3: University Park-Scope of Work
Scope of Work - Site Design (HAI)
Conceptual Design
 Review existing data, such as as-builts and record drawings.  Photo document and conduct site analysis to evaluate the opportunities and constraints of the site.  Conduct a site visit to record existing conditions of the improvement area such as curbs & gutters, sidewalks, walkways and ramps, light poles, fences and walls, drainage inlets, visible above ground utility installations, trees, etc.
 Synthesize data received and compare with site analysis findings to finalize site assessments and prepare the analysis report. Review report with City Staff, revise as necessary.  Obtain and review utility information within the public right of way and park site.  Develop provisions to accommodate existing and new utility facilities (e.g., maintained in place, removed, adjusted, abandoned, or installed).
 Effectively identify utility locations and resolve conflicts on proposed plans to keep the project on schedule.
 Undertake preliminary investigation with SCE to determine the existing power supply and adequacy to service proposed improvements.
 Prepare Design Development plans utilizing the city provided survey as the base sheet. The design shall be predicted upon the conceptual plan approved by the City.  Prepare a preliminary construction cost estimate. Set budgets for proposed amenities.  Obtain quotes/proposals of differing manufacturers for the site amenities.  Prepare color site plan renderings illustrating the design and material selection.  Prepare a geotechnical report that includes infiltration and soil preparation recommendations.  Meet with City Staff to review design concepts and estimate. Revise as needed based on input received.  Provide design presentation of revised Design Development Drawings to City Staff for review and comment.

Deliverables: Preliminary Design Development Drawings and estimates (AutoCAD version compatible with City and PDF). Amenities exhibit featuring photos of proposed materials and Presentation (PowerPoint and PDF). Meeting Minutes and Supporting Documentation) 3 849
University Park City of Palm Desert
SECTION 3: University Park-Scope of Work
Scope of Work - Site Design (HAI)
Construction Documents
Includes monthly status meetings, reports of work, schedule updates and meeting minutes of all communication and action items.

HAI is responsible for developing and assembling Contract Construction Bid Documents (“Bid Documents”) for advertisement and bidding the Project for construction. The Bid Documents shall include all necessary documents to be constructed, Construction Plans and supporting documentation for a complete biddable set.

Furthermore, HAI shall provide Technical Specifications and Cost Estimates associated with the design plans. All Bid Documents shall be prepared and stamped by a CA licensed Landscape Architect. The design shall comply with all latest applicable codes, guidelines, and standards. Plans to be drawn at 1”=20’ and include the following:
• Title/Index Sheet
• Demolition/Protection Plan
• Construction Plans and Details, notes
• Landscape Modification Plans, Details and notes
• Irrigation Modification Plans, Details and notes
• Technical Specifications – City shall prepare the boiler plate specifications • Probable Construction Cost Estimates with back-up/support information on quantities and unit prices All applicable plans, technical specifications and construction cost estimates shall conform to City templates.

All submittals shall be thoroughly checked as part of the Consultants QA/QC program, inclusive of any independent plan check process. All redlines shall be attached to each re-submittal with a summary matrix of comments, edits, and responses provided noting where the revisions have been incorporated into the specific deliverable as necessary.

FINAL DESIGN DELIVERABLE FORMAT
From Plan Check Review Comments
Final Bid Package Submittal (100% PS&E):
• Full Construction Bid Ready Plans (1 PDF file for City duplication and printing and Autocad files) • Specifications (PDF and DOC file formats)
• Project Cost Estimate (Excel file, and PDF)
• All Supporting Documents(PDF and/or DOC)
Bidding
HAI team shall be available throughout the advertisement and bidding period to provide technical assistance to the City. This requires assistance with bidder's inquiries, preparation of addenda, and attendance at the pre-bid field meeting. Bidding procedures shall be the responsibility of the City. • Respond to Requests for Information (RFIs) during the project advertisement period, and log questions and responses.
• Prepare project addenda at the direction of the City. • Attend the pre-construction meeting, job walk
Deliverables: pre-bid meeting notes, comments on requests for information, plan/specification revisions, addendums to bid
4 850
University Park City of Palm Desert
SECTION 3: University Park-Scope of Work
Construction Support
• Prepare the Pre-Construction meeting agenda for the City’s review. The following items will be reviewed at the Pre-Construction meeting:
-Plans, Specifications and Inspection Process
-Submittals and the approval process
-City and State Funds
-Impacted Utilities, Coordination with the City, Departments, and other impacted agencies
-Coordination with schools, residents, businesses and similar entities -Public Notices, construction schedule, and traffic control (if needed) -Encroachment Permits, if any
-Agreed communication
-Weekly Statement of Working Day Reports, contract time and progress meetings -Contract Change Order (CCO) process
-Final project walkthrough, punch list items, preparation of as-built drawings and project acceptance • Conduct preconstruction meeting with City and Contractor. Prepare meeting minutes and distribute to all parties.
• Review contractor payment requests and provide City opinion of work completed. • Coordinate with City project manager, city staff and inspector as necessary during construction. • Review contractor prepared construction schedule and verify adherence during the life of the project.

Update schedule and progress verification as field operations continue and change original schedule. • Review and approve product submittals and shop drawings in accordance with construction documents. • Attend on-site project meetings to review work of the contractor. Prepare written reports of meetings for distribution to all parties. Document what work is taking place and compare to project schedule. Photo document and include in project log of meetings and minutes. • Coordinate with all parties by telephone, fax and e-mail as necessary. • Contract Change Orders (CCOs) may be requested by the City, Contractor or design engineer. When a proposed change is requested, HAI will determine the need for the change, check for conformance to standards, consider other remedies, method of compensation, impact on contract time, estimate of cost, and the likelihood of final approval.
• If HAI finds the proposed change is reasonable, a proposed change order file will be established.

Documents prepared by HAI regarding the Change Order will be given to the Contractor for pricing. HAI will review and evaluate the Contractor’s CCO proposal. Based on the review, HAI will provide a recommendation to the City.
• Observe and approve all soil preparation material, planting methods, and finish grading prior to planting.

Visit local Nursery and tag plant material for project
• Observe the inspection of the installation of all landscape and irrigation equipment. • Respond to contractor’s Request for Information (RFI’s) and other questions during project construction. • Conduct substantial completion review and Contractor and prepare punch list. Review and approve punch list items upon their completion.
• Review and approve all contractor supplied closeout items, manuals and charts for irrigation system, lighting and building as specified in the contract specifications.

Deliverables: meeting notes, comments on requests for information, plan/specification revisions, punch lists and items of correction
5 851
University Park City of Palm Desert
SECTION 3: University Park-Scope of Work
Prepare Record Drawings (As-Builts)
• Within 20 days following the completion and acceptance of the project, furnish the City with a complete set of revised original drawings showing as-built conditions. The as-built plans shall be prepared based on as-built information provided by the City’s Construction Manager and the Contractor Deliverables: As-Builts in PDF Format.

Exclusions and Assumptions
• City will provide the Title Report for the subject property for our use in establishing existing easements and boundary.
• City To provide a survey in Autocad format
• The City will pay all costs for printing and shipping END SECTION 3:
6 852
Creating Award Winning P r o j e c t s
Since 1977
2221 E. Winston Road, Suite A, Anaheim, CA 92806-5540
Phone 714.776.4340 Fax 714.776.4395 www.hailandarch.com LA #5567 Hirsch & Associates, Inc. HAI Landscape Architecture & Planning Hirsch & Associates, Inc. HAI Landscape Architecture & Planning

ORIGINAL
Proposal for Professional Design Services for the Park
and Trailhead Engineering and Design
Improvements for the City of Palm Desert, CA
Washington Charter
853
George Washington Charter of Palm Desert
SECTION 1: George Washington Charter-Project Summary
The City of Palm Desert is planning a targeted improvement project at George Washington Charter School to enhance the functionality, safety, and accessibility of its playground facilities. Washington Charter School is a key educational institution in Palm Desert, serving elementary school students and local community by providing a vital space for play, learning, and social interaction. The proposed upgrades reflect the city’s commitment to supporting youth development by creating a safe, engaging, and inclusive play environment that meets the needs of students, local community and the broader school community.

The project will focus on upgrading the school’s playground with modern play structures and improved safety features. Hirsch and Associates Inc. will manage the project from the initial planning and public engagement phase through final construction, ensuring that the improvements align with the city’s and DSA’s design standards and reflect the input from school staff and local community. Additionally, because the project is located on a school site, all plans and construction documents will need to be submitted to and approved by the California Division of the State Architect (DSA) to ensure compliance with state regulations for school construction and accessibility.

Project Objectives
The primary objectives of the Washington Charter School improvement project are to:
• Upgrade Playground Facilities: Install a new, ADA-compliant playground with modern play structures and safety surfacing. The design will include interactive elements that encourage both physical activity and imaginative play, catering to the developmental needs of elementary school-aged children. • Enhance Safety and Accessibility: Improve access by ensuring full compliance with ADA standards to accommodate students of all abilities.
• Create a Safe and Engaging Play Environment: The playground will feature age-appropriate equipment, seating areas for teachers and caregivers, and secure fencing to ensure a safe environment for students.
• Improve Aesthetic Appeal: The playground will feature a themed play environment that reflects the unique character of George Washington Charter and the local community. • Comply with DSA Requirements: Ensure that all designs, construction documents, and final installations meet the requirements set forth by the Division of the State Architect for public school projects, including structural integrity, safety, and accessibility standards.

Community Meetings
Community and school input will play a key role in shaping the final design and features of the new playground at Washington Charter School. Hirsch and Associates Inc. will develop and implement a Public Engagement Plan to gather feedback through the following methods:
• Initial Stakeholder Meeting: Introduce the project to key stakeholders, including school administrators and local community to gather initial feedback and outline project goals. • Preliminary Design Discussion: Discuss design options with the project team, school and city officials for input and refinement before finalizing the plans.
• DSA Review and Feedback: Submit draft designs to the Division of the State Architect for review and incorporate any required adjustments to ensure compliance with state standards. • City Council and Parks and Recreation Committee Presentations: Provide updates on project progress and secure approval based on community feedback and design adjustments.

The improved playground at George Washington Charter School will create a more dynamic and inclusive environment that supports physical activity, social interaction, and creative play. The project will enhance the overall student experience while reinforcing Palm Desert’s commitment to providing high-quality public amenities that serve both educational and recreational needs. Ensuring that the project meets DSA standards will provide peace of mind to school administrators and parents, knowing that the facility meets the highest safety and design standards.
1 854
George Washington Charter City of Palm Desert
SECTION 2: George Washington Charter-Methodology
HAI will stay in close contact with the City’s Project Manager through weekly or bi-weekly updates and milestone meetings ensuring a coordinated effort. We understand the City’s objective to enhance the community experience by improving University Park Playground. Our approach will focus on creating a functional, safe, and aesthetically pleasing environment that meets the City’s schedule, operational goals and budget requirements.

Work Plan
Basic Services. Perform all the necessary professional landscape architectural and engineering services in a timely and professional manner consistent with the standards of the profession.

Project Management. Provide overall project management, conduct a pre-design kickoff meeting with City Staff to confirm objectives and establish a project schedule. Provide bi-weekly progress updates to ensure alignment with City requirements and timelines. Maintain continuous oversight and address and challenges.

City Provided Information. The City shall provide the topographical survey in Autocad format and all existing documentation it has on file for the improvement area that may include existing utility locations and depths, survey/boundary information, copies of easement documentation, list of agencies having jurisdiction over the project, and contact person for the agency, street improvement plans and storm drain plans. HAI, Hirsch & Associates, Inc will make a good-faith effort to verify the accuracy of such information and utilize it in the preparation of the final working drawings and specifications.

Communication. Participate in consultations and conferences with City Staff and other agencies having jurisdiction over the Project that may be necessary for the completion of the Project. Such consultations and conferences shall continue throughout the project duration. Communication will include a combination of email, telephone, ZOOM and in person meetings at City Hall and/or project site.

Project Feasibility. Provide advice and assistance in determining the feasibility of the Project, analyze the type and quality of materials and construction methods to be selected, and other initial planning matters.

Budget. Use our best judgment in determining the balance between the size, type and quality of construction to achieve a satisfactory solution to maintain the City’s stated budget.

HAI has served as Lead Consultant over the past 47 years on park projects throughout California, Arizona and Nevada. Every project that we undertake includes monitoring and management of our Consulting Fee, Construction Budget and Schedule. HAI provides a monthly invoice to our clients for our completed work. The progress billing contains previous months’ billing as well as total contract value and associated completion percentage. The progress billing provides a comprehensive account of where our progress is related to the total value of the contract.

Quality Control/Quality Assurance
HAI has developed a design quality process for the presentation of deliverables that is consistent and replicable for each deliverable document. Each formal submittal prepared by HAI and team members shall be; • Reviewed by independent technical staff of the discipline involved. • Reviewed for coordination and possible interferences by design staff of other disciplines involved. • Checked by Project Manager for design certification and/or certifies comments for revisions. • Certified that all comments have been incorporated, checked and back checked in accordance • Drawings stamped for internal audit as reviewed, checked and back checked. Once all three quality control checks have been completed, documents are ready for delivery.

Check and Certification of reviewed drawings is undertaken by State Licensed Landscape Architects and Engineers.
2 855
George Washington Charter City of Palm Desert
SECTION 2: : George Washington Charter-Methodology
Administration
 This task includes the project management services including the requirements for meeting documentation, project schedules, progress reports, invoicing, and administration of Consultant work.  A kickoff meeting shall be scheduled within the Task Order/Notice to proceed to review Project objectives and requirements, receive initial information from City/Utilities, establish the communication plan and protocols, baseline delivery schedule, and address other issues as necessary to ensure successful Project initiation.

Deliverables: Project Schedule, Progress Reports, Meeting Notes and invoices.

END SECTION 2:

SECTION 3: George Washington Charter-Scope of Work
Scope of Work - Site Design (HAI-Landmark Structural)
Conceptual Design
 Review existing data, such as as-builts and record drawings.  Photo document and conduct site analysis to evaluate the opportunities and constraints of the site.  Conduct a site visit to record existing conditions of the improvement area such as curbs & gutters, sidewalks, walkways and ramps, light poles, fences and walls, drainage inlets, visible above ground utility installations, trees, etc.
 Synthesize data received and compare with site analysis findings to finalize site assessments and prepare the analysis report. Review report with City Staff, revise as necessary.  Obtain and review utility information within the public right of way and park site.  Develop provisions to accommodate existing and new utility facilities (e.g., maintained in place, removed, adjusted, abandoned, or installed).
 Effectively identify utility locations and resolve conflicts on proposed plans to keep the project on schedule.
 Undertake preliminary investigation with SCE to determine the existing power supply and adequacy to service proposed improvements.
 Prepare Design Development plans utilizing the city provided survey as the base sheet. The design shall be predicted upon the conceptual plan approved by the City.  Prepare a preliminary construction cost estimate. Set budgets for proposed amenities.  Obtain quotes/proposals of differing manufacturers for the site amenities.  Prepare color site plan renderings illustrating the design and material selection.  Prepare a geotechnical report that includes infiltration and soil preparation recommendations.  Meet with City Staff to review design concepts and estimate. Revise as needed based on input received.  Provide design presentation of revised Design Development Drawings to City Staff for review and comment.

Deliverables: Preliminary Design Development Drawings and estimates (AutoCAD version compatible with City and PDF). Amenities exhibit featuring photos of proposed materials and Presentation (PowerPoint and PDF). Meeting Minutes and Supporting Documentation) 3 856
George Washington Charter City of Palm Desert
SECTION 3: : George Washington Charter-Scope of Work
Scope of Work - Site Design (HAI-Landmark Structural)
Construction Documents
Includes monthly status meetings, reports of work, schedule updates and meeting minutes of all communication and action items.

HAI is responsible for developing and assembling Contract Construction Bid Documents (“Bid Documents”) for advertisement and bidding the Project for construction. The Bid Documents shall include all necessary documents to be constructed, Construction Plans and supporting documentation for a complete biddable set.

Furthermore, HAI shall provide Technical Specifications and Cost Estimates associated with the design plans. All Bid Documents shall be prepared and stamped by a CA licensed Landscape Architect and Structural Engineer for DSA submittal process. The design shall comply with all latest applicable codes, guidelines, and standards. Plans to be drawn at 1”=20’ and include the following:
• Title/Index Sheet
• Demolition/Protection Plan
• Construction Plans and Details, notes
• Landscape Modification Plans, Details and notes
• Irrigation Modification Plans, Details and notes
• Site Structural details, calculations and notes
• Technical Specifications – City shall prepare the boiler plate specifications • Probable Construction Cost Estimates with back-up/support information on quantities and unit prices All applicable plans, technical specifications and construction cost estimates shall conform to City templates.

All submittals shall be thoroughly checked as part of the Consultants QA/QC program, inclusive of any independent plan check process. All redlines shall be attached to each re-submittal with a summary matrix of comments, edits, and responses provided noting where the revisions have been incorporated into the specific deliverable as necessary.

FINAL DESIGN DELIVERABLE FORMAT
From Plan Check Review Comments
Final Bid Package Submittal (100% PS&E):
• Full Construction Bid Ready Plans (1 PDF file for City duplication and printing and Autocad files) • Specifications (PDF and DOC file formats)
• Project Cost Estimate (Excel file, and PDF)
• All Supporting Documents(PDF and/or DOC)
Bidding
HAI team shall be available throughout the advertisement and bidding period to provide technical assistance to the City. This requires assistance with bidder's inquiries, preparation of addenda, and attendance at the pre-bid field meeting. Bidding procedures shall be the responsibility of the City. • Respond to Requests for Information (RFIs) during the project advertisement period, and log questions and responses.
• Prepare project addenda at the direction of the City. • Attend the pre-construction meeting, job walk
Deliverables: pre-bid meeting notes, comments on requests for information, plan/specification revisions, addendums to bid
4 857
George Washington Charter City of Palm Desert
SECTION 3: : George Washington Charter-Scope of Work
Construction Support
• Prepare the Pre-Construction meeting agenda for the City’s review. The following items will be reviewed at the Pre-Construction meeting:
-Plans, Specifications and Inspection Process
-Submittals and the approval process
-City and State Funds
-Impacted Utilities, Coordination with the City, Departments, and other impacted agencies
-Coordination with schools, residents, businesses and similar entities -Public Notices, construction schedule, and traffic control (if needed) -Encroachment Permits, if any
-Agreed communication
-Weekly Statement of Working Day Reports, contract time and progress meetings -Contract Change Order (CCO) process
-Final project walkthrough, punch list items, preparation of as-built drawings and project acceptance • Conduct preconstruction meeting with City and Contractor. Prepare meeting minutes and distribute to all parties.
• Review contractor payment requests and provide City opinion of work completed. • Coordinate with City project manager, city staff and inspector as necessary during construction. • Review contractor prepared construction schedule and verify adherence during the life of the project.

Update schedule and progress verification as field operations continue and change original schedule. • Review and approve product submittals and shop drawings in accordance with construction documents. • Attend on-site project meetings to review work of the contractor. Prepare written reports of meetings for distribution to all parties. Document what work is taking place and compare to project schedule. Photo document and include in project log of meetings and minutes. • Coordinate with all parties by telephone, fax and e-mail as necessary. • Contract Change Orders (CCOs) may be requested by the City, Contractor or design engineer. When a proposed change is requested, HAI will determine the need for the change, check for conformance to standards, consider other remedies, method of compensation, impact on contract time, estimate of cost, and the likelihood of final approval.
• If HAI finds the proposed change is reasonable, a proposed change order file will be established.

Documents prepared by HAI regarding the Change Order will be given to the Contractor for pricing. HAI will review and evaluate the Contractor’s CCO proposal. Based on the review, HAI will provide a recommendation to the City.
• Observe and approve all soil preparation material, planting methods, and finish grading prior to planting.

Visit local Nursery and tag plant material for project
• Observe the inspection of the installation of all landscape and irrigation equipment. • Respond to contractor’s Request for Information (RFI’s) and other questions during project construction. • Conduct substantial completion review and Contractor and prepare punch list. Review and approve punch list items upon their completion.
• Review and approve all contractor supplied closeout items, manuals and charts for irrigation system, lighting and building as specified in the contract specifications.

Deliverables: meeting notes, comments on requests for information, plan/specification revisions, punch lists and items of correction
5 858
George Washington Charter City of Palm Desert
SECTION 3: : George Washington Charter-Scope of Work
Prepare Record Drawings (As-Builts)
• Within 20 days following the completion and acceptance of the project, furnish the City with a complete set of revised original drawings showing as-built conditions. The as-built plans shall be prepared based on as-built information provided by the City’s Construction Manager and the Contractor Deliverables: As-Builts in PDF Format.

Exclusions and Assumptions
• City will provide the Title Report for the subject property for our use in establishing existing easements and boundary.
• City To provide a survey in Autocad format
• The City will pay all costs for printing and shipping END SECTION 3:
6 859
Creating Award Winning P r o j e c t s
Since 1977
2221 E. Winston Road, Suite A, Anaheim, CA 92806-5540
Phone 714.776.4340 Fax 714.776.4395 www.hailandarch.com LA #5567 Hirsch & Associates, Inc. HAI Landscape Architecture & Planning Hirsch & Associates, Inc. HAI Landscape Architecture & Planning

ORIGINAL
Proposal for Professional Design Services for the Park
and Trailhead Engineering and Design
Improvements for the City of Palm Desert, CA
Randall Henderson Trailhead
860
Randall Henderson Trailhead City of Palm Desert
SECTION 1: Randall Henderson Trailhead-Project Summary
The City of Palm Desert is seeking to enhance Randall Henderson Trailhead through a series of targeted design and construction improvements aimed at increasing functionality, comfort, and visitor experience. Hirsch and Associates Inc. will oversee the project from public engagement through final construction support, ensuring that the park upgrades align with the community’s needs and the city’s quality standards. Randall Henerson Trailhead serves as a key recreational facility in the city, providing walking trails, and gathering areas for residents and visitors.

The scope of work will be divided into four key phases: public engagement, preliminary planning and conceptual design, construction documentation, and bidding and construction support.

The project will begin with a public engagement process to gather input from local residents and park users to better understand their needs and priorities. The consultant will develop and execute a Public Engagement Plan, host community meetings and stakeholder sessions, and present findings to the City Council and the Parks and Recreation Committee. Feedback from the community will be documented and incorporated into the final design to ensure that the park upgrades reflect the community’s expectations.

During the preliminary planning and conceptual design phase, the consultant will create detailed design plans focused on the following key improvements:

1. Parking:

The existing parking area will be assessed to improve traffic flow and increase capacity where feasible.

Hirsch and Associates Inc. will assess the need for additional parking spaces and ADA-compliant access routes.

2. Shade Structure:

A new shade structure will be designed and installed to provide relief from the sun and improve visitor comfort. The structure will be strategically placed near key amenities to maximize its benefit.

3. Restroom Facilities:

The project will include the coordination and installation of modern prefabricated restroom facilities that meet ADA accessibility standards. The restroom design will focus on durability, easy maintenance, and user comfort.

4. Park Furnishings:

Existing trailhead will be assessed for condition and functionality. All new furnishings will be modern, durable that match the trailheads overall design aesthetic.

A preliminary cost estimate and project timeline will be prepared as part of the design package to help the city manage resources and expectations effectively.

Once the conceptual design is approved, the consultant will prepare a full set of construction documents, including technical specifications. The construction documents will cover all aspects of the project, including parking upgrades, shade structure installation, restroom construction, and furnishing replacements. All designs will comply with local building codes and ADA requirements.

During the bidding and construction support phase, Hirsch and Associates Inc. will provide technical assistance, respond to contractor inquiries, and issue addenda as needed. The consultant will attend pre-bid and pre-construction meetings and provide on-site support during construction to ensure that the project is executed according to the approved plans and within budget.

The completed project will transform Randall Henderson Trailhead into a more comfortable and functional space for the community. The improved parking, shade structure, modern restroom facilities, and upgraded park furnishings will create a more inviting and user-friendly environment, reinforcing Palm Desert’s commitment to providing high-quality public amenities.
1 861
Randall Henderson Trailhead City of Palm Desert
SECTION 2: Randall Henderson Trailhead-Methodology
HAI will stay in close contact with the City’s Project Manager through weekly or bi-weekly updates and milestone meetings ensuring a coordinated effort. We understand the City’s objective to enhance the community experience by improving Randall Henderson Trailhead. Our approach will focus on creating a functional, safe, and aesthetically pleasing environment that meets the City’s schedule, operational goals and budget requirements.

Work Plan
Basic Services. Perform all the necessary professional landscape architectural and engineering services in a timely and professional manner consistent with the standards of the profession.

Project Management. Provide overall project management, conduct a pre-design kickoff meeting with City Staff to confirm objectives and establish a project schedule. Provide bi-weekly progress updates to ensure alignment with City requirements and timelines. Maintain continuous oversight and address and challenges.

City Provided Information. The City shall provide the topographical survey in Autocad format and all existing documentation it has on file for the improvement area that may include existing utility locations and depths, survey/boundary information, copies of easement documentation, list of agencies having jurisdiction over the project, and contact person for the agency, street improvement plans and storm drain plans. HAI, Hirsch & Associates, Inc will make a good-faith effort to verify the accuracy of such information and utilize it in the preparation of the final working drawings and specifications.

Communication. Participate in consultations and conferences with City Staff and other agencies having jurisdiction over the Project that may be necessary for the completion of the Project. Such consultations and conferences shall continue throughout the project duration. Communication will include a combination of email, telephone, ZOOM and in person meetings at City Hall and/or project site.

Project Feasibility. Provide advice and assistance in determining the feasibility of the Project, analyze the type and quality of materials and construction methods to be selected, and other initial planning matters.

Budget. Use our best judgment in determining the balance between the size, type and quality of construction to achieve a satisfactory solution to maintain the City’s stated budget.

HAI has served as Lead Consultant over the past 47 years on park projects throughout California, Arizona and Nevada. Every project that we undertake includes monitoring and management of our Consulting Fee, Construction Budget and Schedule. HAI provides a monthly invoice to our clients for our completed work. The progress billing contains previous months’ billing as well as total contract value and associated completion percentage. The progress billing provides a comprehensive account of where our progress is related to the total value of the contract.

Quality Control/Quality Assurance
HAI has developed a design quality process for the presentation of deliverables that is consistent and replicable for each deliverable document. Each formal submittal prepared by HAI and team members shall be; • Reviewed by independent technical staff of the discipline involved. • Reviewed for coordination and possible interferences by design staff of other disciplines involved. • Checked by Project Manager for design certification and/or certifies comments for revisions. • Certified that all comments have been incorporated, checked and back checked in accordance • Drawings stamped for internal audit as reviewed, checked and back checked. Once all three quality control checks have been completed, documents are ready for delivery.

Check and Certification of reviewed drawings is undertaken by State Licensed Landscape Architects and Engineers.
2 862
Randall Henderson Trailhead City of Palm Desert
SECTION 2: : Randall Henderson Trailhead-Methodology
Administration
 This task includes the project management services including the requirements for meeting documentation, project schedules, progress reports, invoicing, and administration of Consultant work.  A kickoff meeting shall be scheduled within the Task Order/Notice to proceed to review Project objectives and requirements, receive initial information from City/Utilities, establish the communication plan and protocols, baseline delivery schedule, and address other issues as necessary to ensure successful Project initiation.

Deliverables: Project Schedule, Progress Reports, Meeting Notes and invoices.

END SECTION 2:

SECTION 3: : Randall Henderson Trailhead-Scope of Work
Scope of Work - Site Design (HAI-JCA-Blue Peak)
Conceptual Design
 Review existing data, such as as-builts and record drawings.  Photo document and conduct site analysis to evaluate the opportunities and constraints of the site.  Conduct a site visit to record existing conditions of the improvement area such as curbs & gutters, sidewalks, walkways and ramps, light poles, fences and walls, drainage inlets, visible above ground utility installations, trees, etc.
 Synthesize data received and compare with site analysis findings to finalize site assessments and prepare the analysis report. Review report with City Staff, revise as necessary.  Obtain and review utility information within the public right of way and park site.  Develop provisions to accommodate existing and new utility facilities (e.g., maintained in place, removed, adjusted, abandoned, or installed).
 Effectively identify utility locations and resolve conflicts on proposed plans to keep the project on schedule.
 Undertake preliminary investigation with SCE to determine the existing power supply and adequacy to service proposed improvements.
 Prepare Design Development plans utilizing the city provided survey as the base sheet. The design shall be predicted upon the conceptual plan approved by the City.  Prepare a preliminary construction cost estimate. Set budgets for proposed amenities.  Obtain quotes/proposals of differing manufacturers for the site amenities.  Prepare color site plan renderings illustrating the design and material selection.  Prepare a geotechnical report that includes infiltration and soil preparation recommendations.  Meet with City Staff to review design concepts and estimate. Revise as needed based on input received.  Provide design presentation of revised Design Development Drawings to City Staff for review and comment.

Deliverables: Preliminary Design Development Drawings and estimates (AutoCAD version compatible with City and PDF). Amenities exhibit featuring photos of proposed materials and Presentation (PowerPoint and PDF). Geotechnical Report (PDF). Preliminary Grading Plan (AutoCAD version compatible with City and PDF). Meeting Minutes and Supporting Documentation) 3 863
Randall Henderson Trailhead City of Palm Desert
SECTION 3: : Randall Henderson Trailhead-Scope of Work
Scope of Work - Site Design (HAI-JCA-Blue Peak)
Construction Documents
Includes monthly status meetings, reports of work, schedule updates and meeting minutes of all communication and action items.

HAI is responsible for developing and assembling Contract Construction Bid Documents (“Bid Documents”) for advertisement and bidding the Project for construction. The Bid Documents shall include all necessary Civil, electrical, site and site structural and Landscaping/irrigation to be constructed, Construction Plans and supporting documentation for a complete biddable set. Furthermore, HAI shall provide Technical Specifications and Cost Estimates associated with the design plans. All Bid Documents shall be prepared and stamped by a CA licensed Landscape Architect and Professional Engineer with the appropriate license per each discipline of work. The design shall comply with all latest applicable codes, guidelines, and standards. Plans to be drawn at 1”=20’ and include the following:
• Title/Index Sheet
• Demolition/Protection Plan
• Site/Grading and Drainage Plan
• Erosion Control Plan
• Construction Plans and Details, notes
• Landscape Plans, Details and notes
• Irrigation Plans, Details and notes
• Site Electrical plans, specifications, notes and calculations. • Shade structure plans and details (shade structure company to provide structural calculations) • Technical Specifications – City shall prepare the boiler plate specifications • Probable Construction Cost Estimates with back-up/support information on quantities and unit prices.

Scope of Work – Electrical Engineering (JCA)
• One (1) site visit to verify existing power panel and ability to provide power for prefabricated restroom. • Electrical utilities to the prefabricated restroom.
• Conference call design meetings and or email correspondence as required with the Hirsch project team throughout the design phase.
• Electrical load calculations
• Title 24 calculations and forms
• Prepare electrical documents suitable for plan check, bidding and construction • Single line, panel schedules, diagrams and details
• Specifications to be included with electrical drawings • Construction Administration:
• Review electrical shop drawings
• Respond to Electrical Contractor RFI
4 864
Randall Henderson Trailhead City of Palm Desert
SECTION 3: : Randall Henderson Trailhead-Scope of Work
Scope of Work – Civil Engineering Blue Peak

SCOPE OF WORK
Task 1.1: Storm Water Pollution Prevention Plan (SWPPP) / Notice of Intent (NOI) Based on the requirements of the State Water Quality Resources Control Board’s General Permit, a Notice of Intent and a Storm Water Pollution Prevention Plan will be prepared for the site. • We will research the necessary data to accurately complete the Application for Notice of Intent (NOI) and it will be submitted to the State Water Resources Control Board. • Based on site conditions and proposed construction a SWPPP will be prepared to address the specific site water quality concerns.
• The SWPPP will be prepared under the direction of a Qualified SWPPP Developer (QSD) as certified by the California Stormwater Quality Association.

Task 1.2: Water Quality Management Plan (WQMP)
The WQMP will provide guidelines for project-specific post-construction Best Management Practices (BMPs) and for regional and sub-regional Source Control BMPs and Structural BMPs to address management of stormwater runoff quantity and quality to protect the nearby receiving waters. • Address Site Design BMPs.
• Incorporate the applicable Routine Source and Structural Control BMPs. • Describe the long-term operation and maintenance requirements for Structural Control BMPs. • Identify the entity that will be responsible for long-term operation, maintenance, repair and/or replacement of the structural BMPS and the training that qualifies them.
• Provide a copy of the forms to be used in conducting maintenance and inspection activities. • The WQMP will comply with the requirements of the City of Palm Desert Stormwater Program. • You must provide recommended infiltration rates from your geotechnical engineer based on testing done at the job site. Testing must be in conformance with standards set forth by the agency having jurisdiction. These rates must be included in the final geotechnical report.

Task 1.3: Precise Grading Plan Review
Blue Peak Engineering will provide a civil engineering review of the precise grading plans, which will include the following:
• Two (2) civil engineering reviews will be completed with redline comments. • The final set of plans will be stamped and signed by a Registered Civil Engineer for final approval with the City of Palm Desert. All comments from Blue Peak Engineering must be addressed prior to the stamping of the plans.

The Plan format, standard construction notes, and sheet borders shall be commensurate with City standards.

Deliverables:
• Prepare 60%, 90%, and 100% design submissions for City review. (AutoCAD version compatible with City and PDF)
• 60%, 90%,100% Contract Technical Specifications (Word and PDF) • 60%, 90%,100% Engineers Estimate (Excel and PDF)
• Ensure that the specifications comply with the Standard Specifications for Public Works Construction (“Greenbook”).
• Supporting Design Documentation/Calculations (Word, Excel, and PDF) 5 865
Randall Henderson Trailhead City of Palm Desert
SECTION 3: : Randall Henderson Trailhead-Scope of Work
All applicable plans, technical specifications and construction cost estimates shall conform to City templates. All submittals shall be thoroughly checked as part of the Consultants QA/QC program, inclusive of any independent plan check process. All redlines shall be attached to each re-submittal with a summary matrix of comments, edits, and responses provided noting where the revisions have been incorporated into the specific deliverable as necessary.

FINAL DESIGN DELIVERABLE FORMAT
From Plan Check Review Comments
Final Bid Package Submittal (100% PS&E):
• Full Construction Bid Ready Plans (1 PDF file for City duplication and printing and Autocad files) • Specifications (PDF and DOC file formats)
• Project Cost Estimate (Excel file, and PDF)
• All Supporting Documents(PDF and/or DOC)
Bidding
HAI team shall be available throughout the advertisement and bidding period to provide technical assistance to the City. This requires assistance with bidder's inquiries, preparation of addenda, and attendance at the pre-bid field meeting. Bidding procedures shall be the responsibility of the City. • Respond to Requests for Information (RFIs) during the project advertisement period, and log questions and responses.
• Prepare project addenda at the direction of the City. • Attend the pre-construction meeting, job walk
Deliverables: pre-bid meeting notes, comments on requests for information, plan/specification revisions, addendums to bid
Construction Support
• Prepare the Pre-Construction meeting agenda for the City’s review. The following items will be reviewed at the Pre-Construction meeting:
-Plans, Specifications and Inspection Process
-Submittals and the approval process
-City and State Funds
-Impacted Utilities, Coordination with the City, Departments, and other impacted agencies
-Coordination with schools, residents, businesses and similar entities -Public Notices, construction schedule, and traffic control (if needed) -Encroachment Permits, if any
-Agreed communication
-Weekly Statement of Working Day Reports, contract time and progress meetings -Contract Change Order (CCO) process
-Final project walkthrough, punch list items, preparation of as-built drawings and project acceptance • Conduct preconstruction meeting with City and Contractor. Prepare meeting minutes and distribute to all parties.
• Review contractor payment requests and provide City opinion of work completed. • Coordinate with City project manager, city staff and inspector as necessary during construction. • Review contractor prepared construction schedule and verify adherence during the life of the project.

Update schedule and progress verification as field operations continue and change original schedule. • Review and approve product submittals and shop drawings in accordance with construction documents. 6 866
Randall Henderson Trailhead City of Palm Desert
SECTION 3: : Randall Henderson Trailhead-Scope of Work
• Attend on-site project meetings to review work of the contractor. Prepare written reports of meetings for distribution to all parties. Document what work is taking place and compare to project schedule. Photo document and include in project log of meetings and minutes. • Coordinate with all parties by telephone, fax and e-mail as necessary. • Contract Change Orders (CCOs) may be requested by the City, Contractor or design engineer. When a proposed change is requested, HAI will determine the need for the change, check for conformance to standards, consider other remedies, method of compensation, impact on contract time, estimate of cost, and the likelihood of final approval.
• If HAI finds the proposed change is reasonable, a proposed change order file will be established.

Documents prepared by HAI regarding the Change Order will be given to the Contractor for pricing. HAI will review and evaluate the Contractor’s CCO proposal. Based on the review, HAI will provide a recommendation to the City.
• Observe and approve all soil preparation material, planting methods, and finish grading prior to planting.

Visit local Nursery and tag plant material for project
• Observe the inspection of the installation of all landscape and irrigation equipment. • Respond to contractor’s Request for Information (RFI’s) and other questions during project construction. • Conduct substantial completion review and Contractor and prepare punch list. Review and approve punch list items upon their completion.
• Review and approve all contractor supplied closeout items, manuals and charts for irrigation system, lighting and building as specified in the contract specifications.

Deliverables: meeting notes, comments on requests for information, plan/specification revisions, punch lists and items of correction
Prepare Record Drawings (As-Builts)
• Within 20 days following the completion and acceptance of the project, furnish the City with a complete set of revised original drawings showing as-built conditions. The as-built plans shall be prepared based on as-built information provided by the City’s Construction Manager and the Contractor Deliverables: As-Builts in PDF Format.

Exclusions and Assumptions
• City will provide the Title Report for the subject property for our use in establishing existing easements and boundary.
• It is assumed that electrical utilities suitable for supply of new prefabricated restroom are existing on the park site.
• The City will pay all costs for printing and shipping 7 867
Creating Award Winning P r o j e c t s
Since 1977
2221 E. Winston Road, Suite A, Anaheim, CA 92806-5540
Phone 714.776.4340 Fax 714.776.4395 www.hailandarch.com LA #5567 Hirsch & Associates, Inc. HAI Landscape Architecture & Planning Hirsch & Associates, Inc. HAI Landscape Architecture & Planning

ORIGINAL
Proposal for Professional Design Services for the Park
and Trailhead Engineering and Design
Improvements for the City of Palm Desert, CA
Freedom Park
868
Freedom Park City of Palm Desert
SECTION 1: Freedom Park-Project Summary
The City of Palm Desert is planning a major improvement project at Freedom Park to enhance its functionality, safety, and overall visitor experience. Freedom Park serves as one of the city's largest and most popular recreational spaces, offering sports facilities, open green areas, and playgrounds for residents and visitors. The proposed upgrades reflect the city’s commitment to providing high-quality recreational amenities that promote healthy lifestyles, community engagement, and environmental sustainability.

A key focus of the project will be to design and install a state-of-the-art playground that sets a new standard for recreational facilities in Palm Desert. The goal is to create one of the best playgrounds in the city—one that combines innovative play structures, engaging design themes, and inclusive features to provide a top-tier play experience for children of all ages and abilities. Hirsch and Associates Inc. will manage the project from the initial planning and public engagement phase through final construction, ensuring that the design reflects the community's needs and meets the city’s high standards for safety and accessibility.

Project Objectives
The primary objectives of the Freedom Park improvement project are to:
• Create one of the Best Playground in the City: Design and install a modern, ADA-compliant playground with unique and interactive play elements. The playground will feature state-of-the-art equipment that encourages both physical activity and imaginative play, with distinct zones for different age groups and play styles.
• Improve Accessibility and Safety: Playground will feature state-of-the-art equipment and ensure full compliance with ADA standards.
• Develop a Family-Friendly Environment: Provide picnic areas, comfortable seating, and improved wayfinding signage to create a welcoming atmosphere for families and visitors.

Community Meetings
Community input will play a key role in shaping the final design and features of the improvements at Freedom Park. The consultant will develop and implement a Public Engagement Plan to gather feedback through the following methods:
• Initial Stakeholder Meeting: Introduce the project to key stakeholders, including local residents, community organizations, and city staff, to gather initial feedback and outline project goals. • Community Workshops: Provide residents and park users with the opportunity to discuss design concepts and suggest playground features, park layouts, and additional amenities. Specific input on the playground's theme, play structures, and age-appropriate zones will be encouraged. • Preliminary Design Discussion: Present early design options to the community and city officials for input and refinement before finalizing the plans.
• City Council and Parks and Recreation Committee Presentations: Provide updates on project progress and secure approval based on community feedback and design adjustments.

The enhanced Freedom Park will become the premier recreational destination in Palm Desert. The new playground will set a benchmark for play facilities in the city, offering innovative and engaging features that appeal to a wide range of age groups and abilities. The improved accessibility, upgraded park amenities, and enhanced landscaping will create a vibrant and welcoming environment for families and visitors. The project reflects the city’s commitment to fostering a healthy, active, and connected community while establishing Freedom Park as the crown jewel of Palm Desert’s park system. 1 869
Freedom Park City of Palm Desert
SECTION 2: Freedom Park-Methodology
HAI will stay in close contact with the City’s Project Manager through weekly or bi-weekly updates and milestone meetings ensuring a coordinated effort. We understand the City’s objective to enhance the community experience by improving Freedom Park Playground. Our approach will focus on creating a functional, safe, and aesthetically pleasing environment that meets the City’s schedule, operational goals and budget requirements.

Work Plan
Basic Services. Perform all the necessary professional landscape architectural and engineering services in a timely and professional manner consistent with the standards of the profession.

Project Management. Provide overall project management, conduct a pre-design kickoff meeting with City Staff to confirm objectives and establish a project schedule. Provide bi-weekly progress updates to ensure alignment with City requirements and timelines. Maintain continuous oversight and address and challenges.

City Provided Information. The City shall provide the topographical survey in Autocad format and all existing documentation it has on file for the improvement area that may include existing utility locations and depths, survey/boundary information, copies of easement documentation, list of agencies having jurisdiction over the project, and contact person for the agency, street improvement plans and storm drain plans. HAI, Hirsch & Associates, Inc will make a good-faith effort to verify the accuracy of such information and utilize it in the preparation of the final working drawings and specifications.

Communication. Participate in consultations and conferences with City Staff and other agencies having jurisdiction over the Project that may be necessary for the completion of the Project. Such consultations and conferences shall continue throughout the project duration. Communication will include a combination of email, telephone, ZOOM and in person meetings at City Hall and/or project site.

Project Feasibility. Provide advice and assistance in determining the feasibility of the Project, analyze the type and quality of materials and construction methods to be selected, and other initial planning matters.

Budget. Use our best judgment in determining the balance between the size, type and quality of construction to achieve a satisfactory solution to maintain the City’s stated budget.

HAI has served as Lead Consultant over the past 47 years on park projects throughout California, Arizona and Nevada. Every project that we undertake includes monitoring and management of our Consulting Fee, Construction Budget and Schedule. HAI provides a monthly invoice to our clients for our completed work. The progress billing contains previous months’ billing as well as total contract value and associated completion percentage. The progress billing provides a comprehensive account of where our progress is related to the total value of the contract.

Quality Control/Quality Assurance
HAI has developed a design quality process for the presentation of deliverables that is consistent and replicable for each deliverable document. Each formal submittal prepared by HAI and team members shall be; • Reviewed by independent technical staff of the discipline involved. • Reviewed for coordination and possible interferences by design staff of other disciplines involved. • Checked by Project Manager for design certification and/or certifies comments for revisions. • Certified that all comments have been incorporated, checked and back checked in accordance • Drawings stamped for internal audit as reviewed, checked and back checked. Once all three quality control checks have been completed, documents are ready for delivery.

Check and Certification of reviewed drawings is undertaken by State Licensed Landscape Architects and Engineers.
2 870
Freedom Park City of Palm Desert
SECTION 2: Freedom Park-Methodology
Administration
 This task includes the project management services including the requirements for meeting documentation, project schedules, progress reports, invoicing, and administration of Consultant work.  A kickoff meeting shall be scheduled within the Task Order/Notice to proceed to review Project objectives and requirements, receive initial information from City/Utilities, establish the communication plan and protocols, baseline delivery schedule, and address other issues as necessary to ensure successful Project initiation.

Deliverables: Project Schedule, Progress Reports, Meeting Notes and invoices.

END SECTION 2:

SECTION 3: Freedom Park-Scope of Work
Scope of Work - Site Design (HAI)
Conceptual Design
 Review existing data, such as as-builts and record drawings.  Photo document and conduct site analysis to evaluate the opportunities and constraints of the site.  Conduct a site visit to record existing conditions of the improvement area such as curbs & gutters, sidewalks, walkways and ramps, light poles, fences and walls, drainage inlets, visible above ground utility installations, trees, etc.
 Synthesize data received and compare with site analysis findings to finalize site assessments and prepare the analysis report. Review report with City Staff, revise as necessary.  Obtain and review utility information within the public right of way and park site.  Develop provisions to accommodate existing and new utility facilities (e.g., maintained in place, removed, adjusted, abandoned, or installed).
 Effectively identify utility locations and resolve conflicts on proposed plans to keep the project on schedule.
 Undertake preliminary investigation with SCE to determine the existing power supply and adequacy to service proposed improvements.
 Prepare Design Development plans utilizing the city provided survey as the base sheet. The design shall be predicted upon the conceptual plan approved by the City.  Prepare a preliminary construction cost estimate. Set budgets for proposed amenities.  Obtain quotes/proposals of differing manufacturers for the site amenities.  Prepare color site plan renderings illustrating the design and material selection.  Prepare a geotechnical report that includes infiltration and soil preparation recommendations.  Meet with City Staff to review design concepts and estimate. Revise as needed based on input received.  Provide design presentation of revised Design Development Drawings to City Staff for review and comment.

Deliverables: Preliminary Design Development Drawings and estimates (AutoCAD version compatible with City and PDF). Amenities exhibit featuring photos of proposed materials and Presentation (PowerPoint and PDF). Meeting Minutes and Supporting Documentation) 3 871
Freedom Park City of Palm Desert
SECTION 3: Freedom Park-Scope of Work
Scope of Work - Site Design (HAI)
Construction Documents
Includes monthly status meetings, reports of work, schedule updates and meeting minutes of all communication and action items.

HAI is responsible for developing and assembling Contract Construction Bid Documents (“Bid Documents”) for advertisement and bidding the Project for construction. The Bid Documents shall include all necessary documents to be constructed, Construction Plans and supporting documentation for a complete biddable set.

Furthermore, HAI shall provide Technical Specifications and Cost Estimates associated with the design plans. All Bid Documents shall be prepared and stamped by a CA licensed Landscape Architect and Structural Engineer for DSA submittal process. The design shall comply with all latest applicable codes, guidelines, and standards. Plans to be drawn at 1”=20’ and include the following:
• Title/Index Sheet
• Demolition/Protection Plan
• Construction Plans and Details, notes
• Landscape Modification Plans, Details and notes
• Irrigation Modification Plans, Details and notes
• Technical Specifications – City shall prepare the boiler plate specifications • Probable Construction Cost Estimates with back-up/support information on quantities and unit prices All applicable plans, technical specifications and construction cost estimates shall conform to City templates.

All submittals shall be thoroughly checked as part of the Consultants QA/QC program, inclusive of any independent plan check process. All redlines shall be attached to each re-submittal with a summary matrix of comments, edits, and responses provided noting where the revisions have been incorporated into the specific deliverable as necessary.

FINAL DESIGN DELIVERABLE FORMAT
From Plan Check Review Comments
Final Bid Package Submittal (100% PS&E):
• Full Construction Bid Ready Plans (1 PDF file for City duplication and printing and Autocad files) • Specifications (PDF and DOC file formats)
• Project Cost Estimate (Excel file, and PDF)
• All Supporting Documents(PDF and/or DOC)
Bidding
HAI team shall be available throughout the advertisement and bidding period to provide technical assistance to the City. This requires assistance with bidder's inquiries, preparation of addenda, and attendance at the pre-bid field meeting. Bidding procedures shall be the responsibility of the City. • Respond to Requests for Information (RFIs) during the project advertisement period, and log questions and responses.
• Prepare project addenda at the direction of the City. • Attend the pre-construction meeting, job walk
Deliverables: pre-bid meeting notes, comments on requests for information, plan/specification revisions, addendums to bid
4 872
Freedom Park City of Palm Desert
SECTION 3: Freedom Park-Scope of Work
Construction Support
• Prepare the Pre-Construction meeting agenda for the City’s review. The following items will be reviewed at the Pre-Construction meeting:
-Plans, Specifications and Inspection Process
-Submittals and the approval process
-City and State Funds
-Impacted Utilities, Coordination with the City, Departments, and other impacted agencies
-Coordination with schools, residents, businesses and similar entities -Public Notices, construction schedule, and traffic control (if needed) -Encroachment Permits, if any
-Agreed communication
-Weekly Statement of Working Day Reports, contract time and progress meetings -Contract Change Order (CCO) process
-Final project walkthrough, punch list items, preparation of as-built drawings and project acceptance • Conduct preconstruction meeting with City and Contractor. Prepare meeting minutes and distribute to all parties.
• Review contractor payment requests and provide City opinion of work completed. • Coordinate with City project manager, city staff and inspector as necessary during construction. • Review contractor prepared construction schedule and verify adherence during the life of the project.

Update schedule and progress verification as field operations continue and change original schedule. • Review and approve product submittals and shop drawings in accordance with construction documents. • Attend on-site project meetings to review work of the contractor. Prepare written reports of meetings for distribution to all parties. Document what work is taking place and compare to project schedule. Photo document and include in project log of meetings and minutes. • Coordinate with all parties by telephone, fax and e-mail as necessary. • Contract Change Orders (CCOs) may be requested by the City, Contractor or design engineer. When a proposed change is requested, HAI will determine the need for the change, check for conformance to standards, consider other remedies, method of compensation, impact on contract time, estimate of cost, and the likelihood of final approval.
• If HAI finds the proposed change is reasonable, a proposed change order file will be established.

Documents prepared by HAI regarding the Change Order will be given to the Contractor for pricing. HAI will review and evaluate the Contractor’s CCO proposal. Based on the review, HAI will provide a recommendation to the City.
• Observe and approve all soil preparation material, planting methods, and finish grading prior to planting.

Visit local Nursery and tag plant material for project
• Observe the inspection of the installation of all landscape and irrigation equipment. • Respond to contractor’s Request for Information (RFI’s) and other questions during project construction. • Conduct substantial completion review and Contractor and prepare punch list. Review and approve punch list items upon their completion.
• Review and approve all contractor supplied closeout items, manuals and charts for irrigation system, lighting and building as specified in the contract specifications.

Deliverables: meeting notes, comments on requests for information, plan/specification revisions, punch lists and items of correction
5 873
Freedom Park City of Palm Desert
SECTION 3: Freedom Park-Scope of Work
Prepare Record Drawings (As-Builts)
• Within 20 days following the completion and acceptance of the project, furnish the City with a complete set of revised original drawings showing as-built conditions. The as-built plans shall be prepared based on as-built information provided by the City’s Construction Manager and the Contractor Deliverables: As-Builts in PDF Format.

Exclusions and Assumptions
• City will provide the Title Report for the subject property for our use in establishing existing easements and boundary.
• City To provide a survey in Autocad format
• The City will pay all costs for printing and shipping END SECTION 3:
6 874
Creating Award Winning P r o j e c t s
Since 1977
2221 E. Winston Road, Suite A, Anaheim, CA 92806-5540
Phone 714.776.4340 Fax 714.776.4395 www.hailandarch.com LA #5567 Hirsch & Associates, Inc. HAI Landscape Architecture & Planning Hirsch & Associates, Inc. HAI Landscape Architecture & Planning

ORIGINAL
Proposal for Professional Design Services for the Park
and Trailhead Engineering and Design
Improvements for the City of Palm Desert, CA
Ironwood Park
875
Ironwood Park-City of Palm Desert
SECTION 1: Ironwood Park-Project Summary
The City of Palm Desert is planning a targeted improvement project at Ironwood Park to enhance its functionality, comfort, and visitor experience. Ironwood Park serves as an important neighborhood park, providing open spaces and recreational amenities for local residents and visitors. The proposed upgrades reflect the city’s commitment to maintaining high-quality public spaces that support community engagement and outdoor recreation.

The project will focus on adding a new shade structure and a premier water feature to improve comfort and create a more inviting environment for park users. Hirsch and Associates Inc. will manage the project from the initial planning and public engagement phase through final construction, ensuring that the improvements align with the city’s design standards and reflect input from the local community.

Project Objectives
The primary objectives of the Ironwood Park improvement project are to:
• Install a New Shade Structure: Provide relief from the sun by installing a strategically placed shade structure over key park amenities such as seating areas and playgrounds to improve visitor comfort. • Create a Premier Water Feature: Design and install a high-quality water feature that serves as both a focal point and a recreational element. The water feature will include interactive misters and spray elements to provide cooling relief during hot weather while encouraging playful interaction for children and families. The design will focus on energy efficiency and water conservation while ensuring a visually appealing and engaging experience.
• Create a More Comfortable Environment: Improve the overall park experience by adding shaded seating, modern furnishings, and updated landscaping to make the space more inviting and userfriendly. • Enhance Sustainability and Low Maintenance: Use energy-efficient and water-conserving materials for the shade structure and water feature to minimize operational and maintenance costs.

Community Meetings
Community input will be central to shaping the final design and features of the improvements at Ironwood Park.

The consultant will develop and implement a Public Engagement Plan to gather feedback through the following methods:
• Initial Stakeholder Meeting: Introduce the project to key stakeholders, including local residents and city staff, to gather initial feedback and outline project goals. • Community Workshops: Provide residents with the opportunity to discuss design concepts and offer suggestions on the shade structure, water feature design, and other park improvements. • Preliminary Design Discussion: Present early design options to the community and city officials for input and refinement before finalizing the plans.
• City Council and Parks and Recreation Committee Presentations: Provide updates on project progress and secure approval based on community feedback and design adjustments.

The improved Ironwood Park will provide a more comfortable and engaging space for families and visitors. The addition of a premier water feature with interactive misters will create a dynamic and refreshing environment, particularly during warmer months, encouraging both active play and relaxation. The shade structure and enhanced landscaping will further increase comfort and usability, making Ironwood Park a standout recreational destination within Palm Desert. The project reflects the city’s commitment to creating high-quality public amenities that foster social connection, outdoor recreation, and community pride. 1 876
Ironwood Park-City of Palm Desert
SECTION 2: Ironwood Park-Methodology
HAI will stay in close contact with the City’s Project Manager through weekly or bi-weekly updates and milestone meetings ensuring a coordinated effort. We understand the City’s objective to enhance the community experience by improving Ironwood Park. Our approach will focus on creating a functional, safe, and aesthetically pleasing environment that meets the City’s schedule, operational goals and budget requirements.

Work Plan
Basic Services. Perform all the necessary professional landscape architectural and engineering services in a timely and professional manner consistent with the standards of the profession.

Project Management. Provide overall project management, conduct a pre-design kickoff meeting with City Staff to confirm objectives and establish a project schedule. Provide bi-weekly progress updates to ensure alignment with City requirements and timelines. Maintain continuous oversight and address and challenges.

City Provided Information. The City shall provide the topographical survey in Autocad format and all existing documentation it has on file for the improvement area that may include existing utility locations and depths, survey/boundary information, copies of easement documentation, list of agencies having jurisdiction over the project, and contact person for the agency, street improvement plans and storm drain plans. HAI, Hirsch & Associates, Inc will make a good-faith effort to verify the accuracy of such information and utilize it in the preparation of the final working drawings and specifications.

Communication. Participate in consultations and conferences with City Staff and other agencies having jurisdiction over the Project that may be necessary for the completion of the Project. Such consultations and conferences shall continue throughout the project duration. Communication will include a combination of email, telephone, ZOOM and in person meetings at City Hall and/or project site.

Project Feasibility. Provide advice and assistance in determining the feasibility of the Project, analyze the type and quality of materials and construction methods to be selected, and other initial planning matters.

Budget. Use our best judgment in determining the balance between the size, type and quality of construction to achieve a satisfactory solution to maintain the City’s stated budget.

HAI has served as Lead Consultant over the past 47 years on park projects throughout California, Arizona and Nevada. Every project that we undertake includes monitoring and management of our Consulting Fee, Construction Budget and Schedule. HAI provides a monthly invoice to our clients for our completed work. The progress billing contains previous months’ billing as well as total contract value and associated completion percentage. The progress billing provides a comprehensive account of where our progress is related to the total value of the contract.

Quality Control/Quality Assurance
HAI has developed a design quality process for the presentation of deliverables that is consistent and replicable for each deliverable document. Each formal submittal prepared by HAI and team members shall be; • Reviewed by independent technical staff of the discipline involved. • Reviewed for coordination and possible interferences by design staff of other disciplines involved. • Checked by Project Manager for design certification and/or certifies comments for revisions. • Certified that all comments have been incorporated, checked and back checked in accordance • Drawings stamped for internal audit as reviewed, checked and back checked. Once all three quality control checks have been completed, documents are ready for delivery.

Check and Certification of reviewed drawings is undertaken by State Licensed Landscape Architects and Engineers.
2 877
Ironwood Park-City of Palm Desert
SECTION 2: Ironwood Park-Methodology
Administration
 This task includes the project management services including the requirements for meeting documentation, project schedules, progress reports, invoicing, and administration of Consultant work.  A kickoff meeting shall be scheduled within the Task Order/Notice to proceed to review Project objectives and requirements, receive initial information from City/Utilities, establish the communication plan and protocols, baseline delivery schedule, and address other issues as necessary to ensure successful Project initiation.

Deliverables: Project Schedule, Progress Reports, Meeting Notes and invoices.

END SECTION 2:

SECTION 3: Ironwood Park-Scope of Work
Scope of Work - Site Design (HAI-JCA-Blue Peak)
Conceptual Design
 Review existing data, such as as-builts and record drawings.  Photo document and conduct site analysis to evaluate the opportunities and constraints of the site.  Conduct a site visit to record existing conditions of the improvement area such as curbs & gutters, sidewalks, walkways and ramps, light poles, fences and walls, drainage inlets, visible above ground utility installations, trees, etc.
 Synthesize data received and compare with site analysis findings to finalize site assessments and prepare the analysis report. Review report with City Staff, revise as necessary.  Obtain and review utility information within the public right of way and park site.  Develop provisions to accommodate existing and new utility facilities (e.g., maintained in place, removed, adjusted, abandoned, or installed).
 Effectively identify utility locations and resolve conflicts on proposed plans to keep the project on schedule.
 Undertake preliminary investigation with SCE to determine the existing power supply and adequacy to service proposed improvements.
 Prepare Design Development plans utilizing the city provided survey as the base sheet. The design shall be predicted upon the conceptual plan approved by the City.  Prepare a preliminary construction cost estimate. Set budgets for proposed amenities.  Obtain quotes/proposals of differing manufacturers for the site amenities.  Prepare color site plan renderings illustrating the design and material selection.  Prepare a geotechnical report that includes infiltration and soil preparation recommendations.  Meet with City Staff to review design concepts and estimate. Revise as needed based on input received.  Provide design presentation of revised Design Development Drawings to City Staff for review and comment.

Deliverables: Preliminary Design Development Drawings and estimates (AutoCAD version compatible with City and PDF). Amenities exhibit featuring photos of proposed materials and Presentation (PowerPoint and PDF). Preliminary Grading Plan (AutoCAD version compatible with City and PDF).

Meeting Minutes and Supporting Documentation)
3 878
Ironwood Park-City of Palm Desert
SECTION 3: Ironwood Park-Scope of Work
Scope of Work - Site Design (HAI-JCA-Blue Peak)
Construction Documents
Includes monthly status meetings, reports of work, schedule updates and meeting minutes of all communication and action items.

HAI is responsible for developing and assembling Contract Construction Bid Documents (“Bid Documents”) for advertisement and bidding the Project for construction. The Bid Documents shall include all necessary Civil, electrical, site and site structural and Landscaping/irrigation to be constructed, Construction Plans and supporting documentation for a complete biddable set. Furthermore, HAI shall provide Technical Specifications and Cost Estimates associated with the design plans. All Bid Documents shall be prepared and stamped by a CA licensed Landscape Architect and Professional Engineer with the appropriate license per each discipline of work. The design shall comply with all latest applicable codes, guidelines, and standards. Plans to be drawn at 1”=20’ and include the following:
• Title/Index Sheet
• Demolition/Protection Plan
• Site/Grading and Drainage Plan
• Erosion Control Plan
• Construction Plans and Details, notes
• Landscape Plans, Details and notes
• Irrigation Plans, Details and notes
• Site Electrical plans, specifications, notes and calculations. • Shade structure plans and details (shade structure company to provide structural calculations) • Technical Specifications – City shall prepare the boiler plate specifications • Probable Construction Cost Estimates with back-up/support information on quantities and unit prices.

Scope of Work – Electrical Engineering (JCA)
• One (1) site visit to verify existing power panel and ability to provide power for the water feature. • Electrical utilities to the water feature.
• Conference call design meetings and or email correspondence as required with the Hirsch project team throughout the design phase.
• Electrical load calculations
• Title 24 calculations and forms
• Prepare electrical documents suitable for plan check, bidding and construction • Single line, panel schedules, diagrams and details
• Specifications to be included with electrical drawings • Construction Administration:
• Review electrical shop drawings
• Respond to Electrical Contractor RFI
4 879
Ironwood Park-City of Palm Desert
SECTION 3: Ironwood Park-Scope of Work
Scope of Work – Civil Engineering Blue Peak

SCOPE OF WORK
Task 1.1: Storm Water Pollution Prevention Plan (SWPPP) / Notice of Intent (NOI) Based on the requirements of the State Water Quality Resources Control Board’s General Permit, a Notice of Intent and a Storm Water Pollution Prevention Plan will be prepared for the site. • We will research the necessary data to accurately complete the Application for Notice of Intent (NOI) and it will be submitted to the State Water Resources Control Board. • Based on site conditions and proposed construction a SWPPP will be prepared to address the specific site water quality concerns.
• The SWPPP will be prepared under the direction of a Qualified SWPPP Developer (QSD) as certified by the California Stormwater Quality Association.

Task 1.2: Water Quality Management Plan (WQMP)
The WQMP will provide guidelines for project-specific post-construction Best Management Practices (BMPs) and for regional and sub-regional Source Control BMPs and Structural BMPs to address management of stormwater runoff quantity and quality to protect the nearby receiving waters. • Address Site Design BMPs.
• Incorporate the applicable Routine Source and Structural Control BMPs. • Describe the long-term operation and maintenance requirements for Structural Control BMPs. • Identify the entity that will be responsible for long-term operation, maintenance, repair and/or replacement of the structural BMPS and the training that qualifies them.
• Provide a copy of the forms to be used in conducting maintenance and inspection activities. • The WQMP will comply with the requirements of the City of Palm Desert Stormwater Program. • You must provide recommended infiltration rates from your geotechnical engineer based on testing done at the job site. Testing must be in conformance with standards set forth by the agency having jurisdiction. These rates must be included in the final geotechnical report.

Task 1.3: Precise Grading Plan Review
Blue Peak Engineering will provide a civil engineering review of the precise grading plans, which will include the following:
• Two (2) civil engineering reviews will be completed with redline comments. • The final set of plans will be stamped and signed by a Registered Civil Engineer for final approval with the City of Palm Desert. All comments from Blue Peak Engineering must be addressed prior to the stamping of the plans.

The Plan format, standard construction notes, and sheet borders shall be commensurate with City standards.

Deliverables:
• Prepare 60%, 90%, and 100% design submissions for City review. (AutoCAD version compatible with City and PDF)
• 60%, 90%,100% Contract Technical Specifications (Word and PDF) • 60%, 90%,100% Engineers Estimate (Excel and PDF)
• Ensure that the specifications comply with the Standard Specifications for Public Works Construction (“Greenbook”).
• Supporting Design Documentation/Calculations (Word, Excel, and PDF) 5 880
Ironwood Park-City of Palm Desert
SECTION 3: Ironwood Park-Scope of Work
All applicable plans, technical specifications and construction cost estimates shall conform to City templates. All submittals shall be thoroughly checked as part of the Consultants QA/QC program, inclusive of any independent plan check process. All redlines shall be attached to each re-submittal with a summary matrix of comments, edits, and responses provided noting where the revisions have been incorporated into the specific deliverable as necessary.

FINAL DESIGN DELIVERABLE FORMAT
From Plan Check Review Comments
Final Bid Package Submittal (100% PS&E):
• Full Construction Bid Ready Plans (1 PDF file for City duplication and printing and Autocad files) • Specifications (PDF and DOC file formats)
• Project Cost Estimate (Excel file, and PDF)
• All Supporting Documents(PDF and/or DOC)
Bidding
HAI team shall be available throughout the advertisement and bidding period to provide technical assistance to the City. This requires assistance with bidder's inquiries, preparation of addenda, and attendance at the pre-bid field meeting. Bidding procedures shall be the responsibility of the City. • Respond to Requests for Information (RFIs) during the project advertisement period, and log questions and responses.
• Prepare project addenda at the direction of the City. • Attend the pre-construction meeting, job walk
Deliverables: pre-bid meeting notes, comments on requests for information, plan/specification revisions, addendums to bid
Construction Support
• Prepare the Pre-Construction meeting agenda for the City’s review. The following items will be reviewed at the Pre-Construction meeting:
-Plans, Specifications and Inspection Process
-Submittals and the approval process
-City and State Funds
-Impacted Utilities, Coordination with the City, Departments, and other impacted agencies
-Coordination with schools, residents, businesses and similar entities -Public Notices, construction schedule, and traffic control (if needed) -Encroachment Permits, if any
-Agreed communication
-Weekly Statement of Working Day Reports, contract time and progress meetings -Contract Change Order (CCO) process
-Final project walkthrough, punch list items, preparation of as-built drawings and project acceptance • Conduct preconstruction meeting with City and Contractor. Prepare meeting minutes and distribute to all parties.
• Review contractor payment requests and provide City opinion of work completed. • Coordinate with City project manager, city staff and inspector as necessary during construction. • Review contractor prepared construction schedule and verify adherence during the life of the project.

Update schedule and progress verification as field operations continue and change original schedule. • Review and approve product submittals and shop drawings in accordance with construction documents. 6 881
Ironwood Park-City of Palm Desert
SECTION 3: Ironwood Park-Scope of Work
• Attend on-site project meetings to review work of the contractor. Prepare written reports of meetings for distribution to all parties. Document what work is taking place and compare to project schedule. Photo document and include in project log of meetings and minutes. • Coordinate with all parties by telephone, fax and e-mail as necessary. • Contract Change Orders (CCOs) may be requested by the City, Contractor or design engineer. When a proposed change is requested, HAI will determine the need for the change, check for conformance to standards, consider other remedies, method of compensation, impact on contract time, estimate of cost, and the likelihood of final approval.
• If HAI finds the proposed change is reasonable, a proposed change order file will be established.

Documents prepared by HAI regarding the Change Order will be given to the Contractor for pricing. HAI will review and evaluate the Contractor’s CCO proposal. Based on the review, HAI will provide a recommendation to the City.
• Observe and approve all soil preparation material, planting methods, and finish grading prior to planting.

Visit local Nursery and tag plant material for project
• Observe the inspection of the installation of all landscape and irrigation equipment. • Respond to contractor’s Request for Information (RFI’s) and other questions during project construction. • Conduct substantial completion review and Contractor and prepare punch list. Review and approve punch list items upon their completion.
• Review and approve all contractor supplied closeout items, manuals and charts for irrigation system, lighting and building as specified in the contract specifications.

Deliverables: meeting notes, comments on requests for information, plan/specification revisions, punch lists and items of correction
Prepare Record Drawings (As-Builts)
• Within 20 days following the completion and acceptance of the project, furnish the City with a complete set of revised original drawings showing as-built conditions. The as-built plans shall be prepared based on as-built information provided by the City’s Construction Manager and the Contractor Deliverables: As-Builts in PDF Format.

Exclusions and Assumptions
• City will provide the Title Report for the subject property for our use in establishing existing easements and boundary.
• It is assumed that electrical utilities suitable for supply of new prefabricated restroom are existing on the park site.
• The City will pay all costs for printing and shipping 7 882
Creating Award Winning P r o j e c t s
Since 1977
2221 E. Winston Road, Suite A, Anaheim, CA 92806-5540
Phone 714.776.4340 Fax 714.776.4395 www.hailandarch.com LA #5567 Hirsch & Associates, Inc. HAI Landscape Architecture & Planning Hirsch & Associates, Inc. HAI Landscape Architecture & Planning

ORIGINAL
Proposal for Professional Design Services for the Park
and Trailhead Engineering and Design
Improvements for the City of Palm Desert, CA
Proposed Fees
883
Professional Fees
Professional fees for services stated are based upon the scope of work and include all costs for general overhead, profit, telephone, clerical, travel and incidental expenses. Fees shall be valid for the life of the contract.

Reimbursement Expenses
All printing, blueprinting, computer plotting, computer scans, photographic reproductions and special overnight deliveries, other than US Postal Service, requested by the City shall be paid as a direct reimbursable expense plus 15% to Hirsch & Associates.

HAI
Principal Landscape Architect $185
Senior Project Manager $125
Senior Designer $105
Designer $95
Construction Meetings $1,000/ea
Reproduction / Printing Cost Plus 10%
JCA
Principal $216
Associate Principal $202
Project Manager $191
Senior Engineer $166
Project Engineer $153
Designer $139
Draftsman BIM $122
Draftsman/ CAD $104
Technical Typist $64
Blue Peak
Civil Engineer $225/hr
Design Engineer $190/hr
Drafter $90/hr
Landmark Structures
Structural Engineer $225/hr
Drafter $95/hr
Geotechnical fees are lump sum
884
Travel
Authorized travel associated with project design and project meetings, are included within our fees.

Execution
To initiate professional services, Hirsch & Associates Inc. please provide an executed copy of this agreement included with City Agreement.
885
Hovely Soccer Park
HAI Blue Peak
Project Lead Civil
Scope
Conceptual Design
Designer 120hrs @ $95 $11,400.00 $11,400.00
Senior Designer 80hrs @ $105 $8,400.00 $8,400.00
Senior Project Manager 60hrs @ $125 $7,500.00 $7,500.00 Landscape Architect 32hrs @ $185 $5,920.00 $5,920.00
Community Meeting (1) $1,000.00 $1,000.00
Parks Commission Meeting (1) $1,000.00 $1,000.00
City Council Meeting (1) $1,000.00 $1,000.00
Conceptual Design Sub Total $36,220.00 $0.00 $36,220.00 Construction Documents 60.90.100% HAI Civil
Civil Grading and Utility Plans $4,000.00 $4,000.00
SWPPP/NOI $6,500.00 $6,500.00
WQMP $6,500.00 $6,500.00
Landscape Designer 320hrs @ $95 $30,400.00 $30,400.00
Senior Designer 200hrs @ $105 $21,000.00 $21,000.00
Senior Project Manager 120hrs @ $125 $15,000.00 $15,000.00 Landscape Architect 24hrs @$185 $4,440.00 $4,440.00
Construction Document Sub Total $70,840.00 $17,000.00 $87,840.00 Bidding HAI Civil
Landscape Architect 14hrs @ $185 $2,590.00 $2,590.00
Bidding Sub Total $2,590.00 $0.00 $2,590.00
Construction Support HAI Civil
Civil Engineer $2,500.00 $2,500.00
Landscape Architect 16hrs @ $185 $2,960.00 $2,960.00
Construction Meetings 6@ $1000 $6,000.00 $6,000.00
Construction Support Total $8,960.00 $2,500.00 $11,460.00 Grand Total $118,610.00 $19,500.00 $138,110.00
Recommended to include funding to cover printing $5,000.00 and Plan Check Fees, not included in total above
886
Homme Adams Park
HAI Blue Peak LKGE JCA
Project Lead Civil Geotechnical Electrical
Scope
Conceptual Design
Geotechnical Report $9,500.00 $9,500.00
Site Electrical Evaluation $4,500.00 $4,500.00
Designer 120hrs @ $95 $11,400.00 $11,400.00
Senior Designer 80hrs @ $105 $8,400.00 $8,400.00
Senior Project Manager 60hrs @ $125 $7,500.00 $7,500.00 Landscape Architect 32hrs @ $185 $5,920.00 $5,920.00
Community Meeting $1,000.00 $1,000.00
Parks Commission Meeting (1) $1,000.00 $1,000.00
City Council Meeting (1) $1,000.00 $1,000.00
Conceptual Design Sub Total $36,220.00 $0.00 $50,220.00 Construction Documents 60.90.100%
Electrical supply to prefab restoom $12,000.00 $12,000.00 Civil Grading and Utility Plans $4,000.00 $4,000.00
SWPPP/NOI $6,500.00 $6,500.00
WQMP $6,500.00 $6,500.00
Landscape Designer 320hrs @ $95 $30,400.00 $30,400.00
Senior Designer 200hrs @ $105 $21,000.00 $21,000.00
Senior Project Manager 120hrs @ $125 $15,000.00 $15,000.00 Landscape Architect 40hrs @$185 $7,400.00 $7,400.00
Construction Document Sub Total $73,800.00 $17,000.00 $102,800.00 Bidding HAI Civil
Landscape Architect 14hrs @ $185 $2,590.00 $2,590.00
Bidding Sub Total $2,590.00 $0.00 $2,590.00
Construction Support HAI Civil
Civil Engineer $2,500.00 $2,500.00
Landscape Architect 16hrs @ $185 $2,960.00 $2,960.00
Construction Meetings 6@ $1000 $6,000.00 $6,000.00
Construction Support Total $8,960.00 $2,500.00 $11,460.00 Grand Total $121,570.00 $19,500.00 $9,500.00 $0.00 $167,070.00 Recommended to include funding to cover printing $5,000.00 and Plan Check Fees, not included in total above
887
University Park
HAI
Project Lead
Scope
Conceptual Design
Designer 80hrs @ $95 $7,600.00
Senior Designer 40hrs @ $105 $4,200.00
Senior Project Manager 16hrs @ $125 $2,000.00
Landscape Architect 8hrs @ $185 $1,480.00
Community Meeting $1,000.00
Parks Commission Meeting (1) $1,000.00
City Council Meeting (1) $1,000.00
Conceptual Design Sub Total $18,280.00
Construction Documents 60.90.100%
Landscape Designer 120hrs @ $95 $11,400.00
Senior Designer 32hrs @ $105 $3,360.00
Senior Project Manager 16hrs @ $125 $2,000.00
Landscape Architect 8hrs @$185 $1,480.00
Construction Document Sub Total $18,240.00
Bidding
Landscape Architect 14hrs @ $185 $2,590.00
Bidding Sub Total $2,590.00
Construction Support
Landscape Architect 16hrs @ $185 $2,960.00
Construction Meetings 6@ $1000 $6,000.00
Construction Support Total $8,960.00
Grand Total $48,070.00
Recommended to include funding to cover printing
and Plan Check Fees, not included in total above
888
Washington Charter School
HAI Landmark
Project Lead Structural
Scope
Conceptual Design
Designer 80hrs @ $95 $7,600.00 $7,600.00
Senior Designer 40hrs @ $105 $4,200.00 $4,200.00
Senior Project Manager 16hrs @ $125 $2,000.00 $2,000.00 Landscape Architect 8hrs @ $185 $1,480.00 $1,480.00
DSA Review $5,000.00 $5,000.00
Community Meeting $1,000.00 $1,000.00
Parks Commission Meeting (1) $1,000.00 $1,000.00
City Council Meeting (1) $1,000.00 $1,000.00
Conceptual Design Sub Total $23,280.00 $0.00 $23,280.00 Construction Documents 60.90.100%
Landscape Designer 120hrs @ $95 $11,400.00 $11,400.00
Senior Designer 32hrs @ $105 $3,360.00 $3,360.00
Senior Project Manager 16hrs @ $125 $2,000.00 $2,000.00 Landscape Architect 8hrs @$185 $1,480.00 $1,480.00
Structural Engineering $9,000.00 $9,000.00
DSA Review $15,000.00 $15,000.00
Construction Document Sub Total $33,240.00 $9,000.00 $42,240.00 Bidding
Landscape Architect 14hrs @ $185 $2,590.00 $2,590.00
Bidding Sub Total $2,590.00 $0.00 $2,590.00
Construction Support
Landscape Architect 16hrs @ $185 $2,960.00 $2,960.00
Construction Meetings 6@ $1000 $6,000.00 $6,000.00
Construction Support Total $8,960.00 $0.00 $8,960.00
Grand Total $68,070.00 $9,000.00 $77,070.00
Recommended to include funding to cover printing $5,000.00 and Plan Check Fees, not included in total above
889
Randell Henderson Trailhead
HAI Blue Peak LKGE
Project Lead Civil Geotechnical
Scope
Conceptual Design
Geotechnical Report $9,500.00 $9,500.00
Designer 120hrs @ $95 $11,400.00 $11,400.00
Senior Designer 80hrs @ $105 $8,400.00 $8,400.00
Senior Project Manager 60hrs @ $125 $7,500.00 $7,500.00 Landscape Architect 32hrs @ $185 $5,920.00 $5,920.00
Community Meeting $1,000.00 $1,000.00
Parks Commission Meeting (1) $1,000.00 $1,000.00
City Council Meeting (1) $1,000.00 $1,000.00
Conceptual Design Sub Total $36,220.00 $0.00 $45,720.00 Construction Documents 60.90.100% HAI Civil
Civil Grading and Utility Plans $4,000.00 $4,000.00
SWPPP/NOI $6,500.00 $6,500.00
WQMP $6,500.00 $6,500.00
Landscape Designer 320hrs @ $95 $30,400.00 $30,400.00
Senior Designer 200hrs @ $105 $21,000.00 $21,000.00
Senior Project Manager 120hrs @ $125 $15,000.00 $15,000.00 Landscape Architect 40hrs @$185 $7,400.00 $7,400.00
Construction Document Sub Total $73,800.00 $17,000.00 $90,800.00 Bidding HAI Civil
Landscape Architect 14hrs @ $185 $2,590.00 $2,590.00
Bidding Sub Total $2,590.00 $0.00 $2,590.00
Construction Support HAI Civil
Civil Engineer $2,500.00 $2,500.00
Landscape Architect 16hrs @ $185 $2,960.00 $2,960.00
Construction Meetings 6@ $1000 $6,000.00 $6,000.00
Construction Support Total $8,960.00 $2,500.00 $11,460.00 Grand Total $121,570.00 $19,500.00 $9,500.00 $150,570.00 Recommended to include funding to cover printing $5,000.00 and Plan Check Fees, not included in total above
890
Freedom Park
HAI
Project Lead
Scope
Conceptual Design
Designer 80hrs @ $95 $7,600.00
Senior Designer 40hrs @ $105 $4,200.00
Senior Project Manager 16hrs @ $125 $2,000.00
Landscape Architect 8hrs @ $185 $1,480.00
Community Meeting $1,000.00
Parks Commission Meeting (1) $1,000.00
City Council Meeting (1) $1,000.00
Conceptual Design Sub Total $18,280.00
Construction Documents 60.90.100%
Landscape Designer 120hrs @ $95 $11,400.00
Senior Designer 32hrs @ $105 $3,360.00
Senior Project Manager 16hrs @ $125 $2,000.00
Landscape Architect 8hrs @$185 $1,480.00
Construction Document Sub Total $18,240.00
Bidding
Landscape Architect 14hrs @ $185 $2,590.00
Bidding Sub Total $2,590.00
Construction Support
Landscape Architect 16hrs @ $185 $2,960.00
Construction Meetings 6@ $1000 $6,000.00
Construction Support Total $8,960.00
Grand Total $48,070.00
Recommended to include funding to cover printing
and Plan Check Fees, not included in total above
891
Ironwood Park
HAI Blue Peak JCA
Project Lead Civil Electrical
Scope
Conceptual Design
Site Electrical Evaluation $4,500.00 $4,500.00
Designer 120hrs @ $95 $11,400.00 $11,400.00
Senior Designer 80hrs @ $105 $8,400.00 $8,400.00
Senior Project Manager 60hrs @ $125 $7,500.00 $7,500.00 Landscape Architect 32hrs @ $185 $5,920.00 $5,920.00
Community Meeting $1,000.00 $1,000.00
Parks Commission Meeting (1) $1,000.00 $1,000.00
City Council Meeting (1) $1,000.00 $1,000.00
Conceptual Design Sub Total $36,220.00 $0.00 $40,720.00 Construction Documents 60.90.100%
Electrical supply to Splash Pad $12,000.00 $12,000.00
Civil Grading and Utility Plans $4,000.00 $4,000.00
SWPPP/NOI $6,500.00 $6,500.00
WQMP $6,500.00 $6,500.00
Health Deprtment Plan Check $5,000.00 $5,000.00
Landscape Designer 300hrs @ $95 $28,500.00 $28,500.00
Senior Designer 200hrs @ $105 $21,000.00 $21,000.00
Senior Project Manager 120hrs @ $125 $15,000.00 $15,000.00 Landscape Architect 40hrs @$185 $7,400.00 $7,400.00
Construction Document Sub Total $76,900.00 $17,000.00 $12,000.00 $105,900.00 Bidding HAI Civil
Landscape Architect 14hrs @ $185 $2,590.00 $2,590.00
Bidding Sub Total $2,590.00 $0.00 $2,590.00
Construction Support HAI Civil
Civil Engineer $2,500.00 $2,500.00
Landscape Architect 16hrs @ $185 $2,960.00 $2,960.00
Construction Meetings 6@ $1000 $6,000.00 $6,000.00
Construction Support Total $8,960.00 $2,500.00 $11,460.00 Grand Total $124,670.00 $19,500.00 $16,500.00 $160,670.00 Recommended to include funding to cover printing $5,000.00 and Plan Check Fees, not included in total above
892
Creating Award Winning P r o j e c t s
Since 1977
2221 E. Winston Road, Suite A, Anaheim, CA 92806-5540
Phone 714.776.4340 Fax 714.776.4395 www.hailandarch.com LA #5567 Hirsch & Associates, Inc. HAI Landscape Architecture & Planning Hirsch & Associates, Inc. HAI Landscape Architecture & Planning

ORIGINAL
Proposal for Professional Design Services for the Park
and Trailhead Engineering and Design
Improvements for the City of Palm Desert, CA
Project Team Resumes
893
Firm Pro
file
Hirsch & Associates, Inc. HAI Landscape Architecture & Planning Charles E. Foley, ASLA
President
Chief Executive Officer
Education
Landscape Architecture, BS
California State Polytechnic University,
Pomona, California
Registration
Licensed Landscape Architect, California #5567
Licensed Landscape Architect, Nevada #948
Experience
Mr. Foley has over 25 years of professional Landscape Architectural and Planning design experience. He has been the Principal in Charge of a wide variety of public park, streetscape, school districts and private development projects. The projects include renovation of existing parks as well as development of new facilities, Brownfield and Landfill sites, Habitat Restoration, irrigation renovation and water efficiency/reduction efforts. As Principal in Charge of each project, he oversees all aspects of development including the public input process from stakeholders, interaction with commissions and council, administers quality control of HAI staff and sub consultants during the design process as well as integral involvement during the construction process. His early field experience in construction prior to becoming a design professional serves clients well with knowledge related to site work and all aspects of park development. The culmination of this experience has served his clients well with creative projects meeting the needs of the stakeholders, completed on time and within budget. Many completed projects he has managed have been awarded merit by the California Park and Recreation Society (CPRS) as well as the American Public Works Association (APWA).

With or without rewards, the completely projects have become treasured assets of communities they serve.

Professional Responsibilities
Project Management
Client Contact & Development
Project Production
Construction Document Preparation
Construction Support
Community Workshops
Public Meetings
Presentations
Affiliations
American Society of Landscape Architects (ASLA)
ASLA Mentor
California Park & Recreation Society
Mackay Park,
City of Cypress
Rotary Centennial Park,
City of Long Beach
Cesar Chavez Park,
City of Pomona
Long Beach Bike & Pedestrian Trail,
City of Long Beach
894
Sycamore Canyon Park,
Diamond Bar, CA
Rio Vista Park
Pico Rivera, CA
Smith Park
Pico Rivera, CA
Professional Responsibilities
Mackay Park,
Cypress, CA
Project Management
Construction Management
Construction Support
Water Audits
Water Management
SWPPP Inspections
Irrigation Consultation
Presentations
Community Workshops
Conceptual Design Preparation
Construction Document Preparation
Affiliations
IA Irrigation Association
California Landscape Contractor Association
California Park & Recreation Society
Wildlife Conservation Society
Louis A. Pompei Memorial Park,
City of Glendora, CA
Janss Plaza Historic Renovation,
UCLA Los Angeles, CA
Education
Construction Technology
College of the Redwoods, Eureka CA Horticulture,
Fullerton College, Fullerton CA
Registration
Licensed Landscape Contractor (C-27) CA #956898
Certified Landscape Irrigation Designer and Auditor, CLIA #84847, Certified SWPPP QSP #28925
Experience
Mr. Hirsch has 34 years of experience in the landscape
design and construction industry. Before joining Hirsch & Associates, Inc. 1998, Mr. Hirsch obtained ten years’ experience working for a General Contractor, installing all aspects of landscape construction.

Mr. Hirsch has continued to increase his capacity at HAI, starting from draftsman to his current title of Vice
President. Accomplishments during his professional
career including Autodesk/AutoCAD certification, certified irrigation designer and certified water auditor, qualified SWPPP practitioner QSP. Mr. Hirsch is a
licensed landscape contractor in the State of California.

Firm
ProFile
14 895
Hirsch & Associates, Inc.

Landscape Architecture & Planning
Greg Thayer
Senior Designer
Education
Landscape Architecture, BS
California State Polytechnic University,
Pomona, California
Registration
Licensed Landscape Architect, in progress, completed 3 of 5 sections.

Experience
Mr. Thayer joined Hirsch and Associates, Inc. in 2022
with years of previous experience having worked in the
landscape construction industry as well as horticultural and multidisciplinary firm in their Landscape Architecture division where he collaborated on projects with
architects, engineers, and environmental planners. He
works closely with clients and sub consultants to
develop various projects from conceptualization
through design development and lastly to construction
documents and support. He has been involved with a
wide range of projects such as Park and Recreation
Facilities, Sports Parks, Commercial Retail Centers, and Streetscape Beautification.

Professional Responsibilities
Construction Document Preparation
Graphic Design/Rendering
Project Production
Construction Support
Community Workshops/Public Meetings
Subconsultant Coordination
Client Contact and Development
Affiliations
American Society of Landscape Architects
New City Park, Adelanto CA
Civic Center Park, Pomona CA
Meadowview Demonstration Garden, City of Pomona CA
Firm
ProFile
896
Firm Profile

JACOB LAURENTOWSKI
Designer
Education
Landscape Architecture, BS
California State Polytechnic University,
Pomona, California
Experience
Mr. Laurentowski joined Hirsch & Associates, Inc. in
2022 while finishing the last year of his BS at Cal Poly Pomona. Upon graduation in 2023, he has been a full-time employee, working diligently to gain experience and expand his repertoire. Since then, he has successfully worked
with clients and sub consultants to move projects from
conceptualization to construction documentation. While Mr.

Laurentowski has spent much of his time in the municipal sphere, heading various park and playground renovations, he has worked on a diversity of projects including: sports fields, commercial retail centers, large-scale habitat irrigation, gateway monument signs, and municipal studies.

Professional Responsibilities
Conceptual Design
Construction Document Preparation
Project Production
Graphic Design/Rendering
Community Outreach/Public Meetings
Client & Subconsultant Contact
Affiliations
American Society of Landscape Architects (ASLA)
Hilda L. Solis Park Renovation Concept
City of Baldwin Park, CA
Labourdette Park Renovation
City of Los Alamitos, CA
Russel C. Paris Playground Renovation Concept
City of Westminster, CA
Jaycee Parkette Renovation Concept
City of Placentia, CA
897
Organizational Chart
City of Palm Desert
Charles Foley, President
Architect of Record
Landscape Architect CA #5567
Rob Deprat PE
Blue Peak Engineering
Civil Engineering
Mark Hirsch, Project Manager
Vice President
Landscape Contractor C956898
Certified Irrigation Auditor 84847
Greg Thayer
Senior Designer
Jacob Laurentowski
Designer
James Corns EE
JCA
Electrical
Engineering
Sean Lin GE
LKGE
Geotechnical Engineer
Techical Drafting Staff
Designers
Tony Hobollah SE
Landmark Structures
Structural Engineering
Note: Per Addendum 1, City shall provide survey, no surveyor on the project team.

HAI can provide survey if needed, Pacific Land Consultants. 898
Robert DePrat, P.E.
1853 Yorba Linda Bl#235
Yorba Linda, Ca. 92886
714-749-3077
[email protected]
California (#60482)
Bachelor of Science, Civil Engineering, UC Irvine
M.B.A. UC Irvine
Professional Experience
Mr. DePrat has over 20 years of professional civil engineering experience serving clients throughout California in a wide range of public parks and private development projects. Blue Peak Engineering has provided civil engineering services to HAI throughout its history including sports parks, roadway design and recreation facilities. Along with his depth of experience, Mr.

DePrat’s success is attributed to his dedication to customer service and maintaining valuable working relationships among clients, contractors and jurisdictional agencies.

JCA Engineering Inc. is dedicated to providing efficiently innovative architectural lighting design services, and state-of-the-art electrical engineering. Projects successfully completed within the last year represent total construction values exceeding thirty million dollars. Those projects encompassed new and renovated educational facilities, efficient public works facilities, religious facilities, active and passive recreational sites, sports complexes, arenas and streetscapes for community revitalization. The principals of this growing design firm offer more than 65 combined years of experience in electrical systems engineering.

We implement new technology to evaluate our design proposals using software such as AutoCAD 2025.

Lighting design incorporates all required Title 24 energy codes, and we are capable of providing all the required Title 24 forms to meet all state requirements.

JCA offers comprehensive experience in government, public works, federal, religious, business, institutional, private and educational facilities electrical system requirements and construction. In addition, JCA provides design expertise in fire alarm, electronic communications, intrusion alarm and video distribution systems.
899
LK Geotechnical Engineering, Inc.
10120 National Boulevard, Los Angeles, CA 90034
Engineer: 626.328.4346; Geologist: 310.866.8977
COMPANY PROFILE:

LK Geotechnical Engineering, Inc. (LKGE) was founded by two experienced professionals, Dr. Sean Lin and Mr.

Mark  Kruger  in  Los  Angeles,  California.    Our  services  include  geotechnical  and  geological  consultation, geotechnical investigation, soil infiltration study for storm water management, laboratory soil testing, field geotechnical inspection, soil compaction testing, and deputy grading inspection in the Greater Los Angeles area.

Dr.  Lin  is  a  California  licensed  Geotechnical  Engineer  (G.E.)  who  has  extensive  geotechnical  knowledge, including soil mechanics, foundation analysis and constructability, geotechnical site stability evaluation, and advanced seismic hazard analysis. In addition, Dr. Lin was an adjunct professor teaching classes in advanced foundation and geotechnical earthquake engineering at California State University, Los Angeles.

Mr.  Kruger  is  a  California  licensed  Engineering  Geologist  (C.E.G.)  who  has  been  practicing  geological investigation and geotechnical inspection since 1997.  His professional specialty includes geological hazard evaluation, hillside geological mapping, groundwater mitigations, earthquake  fault study, and construction consultation and inspection.

Our goal is to provide the straight‐forward professional services that our clients can count on.  Our company’s aim  is  to  deliver  quality  services  in  a  timely  manner,  to  keep  our  client  well‐informed,  and  to  resolve engineering problems in a logically cost‐effective way.

Our  geotechnical  consulting  experience  includes  residential  and  commercial  development,  offices  and warehouses, schools and colleges, health  facilities, and municipal public work projects.  The  following is a selected list of our project experience:
• City of Alhambra Dog Park, Alhambra, CA
• Bright Star Valor Academy High School Sport Field, North Hills, CA • KIPP Academy of Innovation Sport Field, Los Angeles, CA • Everest Value School Classroom Building and Sports Field, Los Angeles, CA • CWC West Vally School Classroom Building and Sports Field, Winnetka, CA • Fillmore Fish Hatchery Feed Bins, Fillmore, CA
• 7301 Broadway Affordable Housing Apartment, Los Angeles, CA • Slauson Marketplace Target Store renovation parking lot LID facilities, Huntington Park, CA • 7‐Eleven Buena Park, Buena Park, CA
• Neighborhood Healthcare parking lot and ADA ramp, Escondido, CA

900
LK Geotechnical Engineering, Inc.
10120 National Boulevard, Los Angeles, CA 90034
Engineer: 626.328.4346; Geologist: 310.866.8977
1 of 1
CHI‐HSIN (SEAN) LIN, Ph.D, P.E., G.E.

PRINCIPAL ENGINEER, VICE PRESIDENT
PROFILE:

Dr. Lin is a California licensed geotechnical engineer (G.E.) who has extensive geotechnical knowledge, including soil mechanics, foundation analysis and constructability, geotechnical site stability evaluation, and advanced seismic hazard analysis. In addition, Dr. Lin is an adjunct professor teaching advanced foundation and geotechnical earthquake engineering classes at California State University, Los Angeles.

Dr. Lin provides consultation and collaborates with client and project design team, conducts/manages field explorations, performs analysis to prepare reports, and reviews reports and plans during the design phase of a project.  During the construction phase, Dr. Lin supervises and manages field inspection activities and laboratory testing, performs QA/QC on inspection and testing.

PROFESSIONAL LICENSES:
2004  Professional Engineer (Civil), No. 67109, State of California 2011  Geotechnical Engineer, No. 2921, State of California City of Los Angeles, Deputy Grading Inspector, No. P041202 EDUCATION:
2002  Ph. D., University of Southern California, Civil Engineering with emphasis on Earthquake Engineering
1997  Master of Science, University of Southern California, Civil Engineering with emphasis on Geotechnical Engineering
1993  Bachelor of Science, Chung Yuan Christian University, Civil Engineering SELECTED PROJECT EXPERIENCE:

MUSEUMS AND PARKS:

City of Santa Monica, Tonga Park, Santa Monica, CA
City of Burbank, 5‐Points Art and Landscape, Burbank, CA City of El Monte, Mary Van Dyke Park Improvement, El Monte, CA Audubon Nature Center at Debs Park, Grading and Slope Restoration, Los Angeles, CA Discovery Science Center Expansion Phase 1, Santa Ana, CA Universal Studio Hollywood, Harry Potter Ride, Universal City, CA Universal Studio Hollywood, Animation Store, Universal City, CA Universal Studio Hollywood, Dreamwork Theater, Universal City, CA Universal Studio Hollywood, Jurassic World Ride, Universal City, CA City of Alhambra Dog Park, Alhambra, CA
901
902
City of Palm Desert
PW - Operations & Maintenance
Randy Chavez, Deputy Director
73-510 Fred Waring Drive, Palm Desert, CA 92260
[HERMANN DESIGN GROUP] RESPONSE DOCUMENT REPORT
RFP No. 2024-RFP-156
Park and Trailhead Engineering and Design
RESPONSE DEADLINE: March 18, 2025 at 5:00 pm
Report Generated: Wednesday, March 19, 2025
Hermann Design Group Response

CONTACT INFORMATION
Company:

Hermann Design Group
Email:
[email protected]
Contact:

Kristin Hermann
Address:
77-899 Wolf Road Suite 102
Palm Desert, CA 92211
Phone:
(760) 777-9131
Website:
www.hdg-inc.com
Submission Date:

Mar 18, 2025 4:49 PM (Pacific Time)
903
[HERMANN DESIGN GROUP] RESPONSE DOCUMENT REPORT
RFP No. 2024-RFP-156
Park and Trailhead Engineering and Design
[HERMANN DESIGN GROUP] RESPONSE DOCUMENT REPORT
Request For Proposal - Park and Trailhead Engineering and Design

Page 2 ends
← All documents from this meeting