TASK IV – BIDDING AND CONSTRUCTION SUPPORT
While the City anticipates completion of Tasks I through III of this scope of work within 12 - 15 months of project start, Task IV is expected to commence when the City begins preparing to invite bids for construction of the project. There will likely be an interval of time between completion of Task III and commencement of Task IV. To accommodate this time frame, the agreement for this project has been drafted with a three-year term, including the option to renew the agreement automatically for two additional one-year terms. The duration of Task IV will vary based on the extent of the project design.
10. BIDDING
• The Consultant(s) shall provide an electronic copy of the final approved plans. The electronic copy of the plans shall be provided as both AutoCAD files and PDF files, and the electronic copy of the specifications shall be provided in both Microsoft Word format and PDF format. • The City will be responsible for making copies of contract documents and will distribute to contractors.
• The Consultant(s) shall respond to questions that arise during the bid phase and prepare addendums which will be distributed by City as necessary.
• Bidding procedures will be the responsibility of the City. While the PS&E construction package is being advertised for bids, all questions concerning the intent shall be referred to City for resolution.
In the event that any items requiring interpretation in the drawings or specifications are discovered during the bidding period or bid opening, said items shall be analyzed by the Consultant(s) for decision by City as to the proper procedure required. Corrective action taken will either be in the form of an addendum prepared by the Consultant(s) and issued by City, or by a covering change order after the award to the construction contract.
• The Consultant(s) shall attend the pre-bid and pre-construction meetings upon notification by City.
During construction and if authorized by City, the Consultant(s) shall furnish all necessary drawings for corrections, requests for information (RFI) and change orders required by errors and omissions of the Consultant(s). The Consultant(s) may be assigned by City to review and approve submittals and shop plan drawings submitted by the construction contractor.
11. CONSTRUCTION SUPPORT
City will serve as the contract manager and direct liaison between the Consultant(s) and other city agencies and peer agencies. The Consultant(s) shall be responsible for project management activities throughout the life of the contract. The scope of activities includes, but is not limited to, coordinating and being responsible for scheduling meetings, managing the project schedule, preparing and distributing minutes, field reviews, tracking action items for City and the Consultant(s’) sub-contractors, and preparing all exhibits and presentations for City to submit to City Council, peer agencies and public meetings (as applicable).
• Consultant shall attend an in-person pre-construction meeting • Consultant shall respond to requests for information and prepare addendums and clarifications for landscape related work.
• Consultant shall review contractor submittals and shop drawings. • Consultant shall provide field observation for the landscape related work at the appropriate stages of construction
1047
SCOPE OF SERVICES
• Consultant shall review completed project and prepare a punch list of outstanding items related to landscape (one site visit).
• Consultant shall review the completed punch list items and provide a letter of substantial completion (one site visit).
• Consultant shall provide record drawing As-Built Plans. The As-Built plans will be based off known changes that were made in the field during the construction process and marked up redlines provided by the contractor. It is anticipated that three (3) Delta revised plans shall be included as part of this task. The plans will include any Delta revisions necessary showing the proposed changes.
This task assumes that the awarded contractor maintains accurate records of said changes for utilization by Consultant for the preparation of said As-Builts. This task does not include additional topographic survey field time but can be included under a separate Change Order if requested. Any additional topo work will not commence until such an agreement has been executed between the client and Consultant.
• Note: Although the Consultant may observe and discuss potential problems with the Client/ Owner or the Client/ Owner’s contractor(s), the site visits are not construction inspections or a guarantee that there will not be construction deficiencies. Contractor submittals, such as shop drawings and samples are reviewed by the Consultant only to determine if they conform to the Consultant’s design intent. Consultant’s review of submittals shall not constitute approval of safety precautions or construction means, methods, techniques, sequences or procedures. Consultant’s review of Contractor’s payment applications to determine if the amount of work represented as complete is generally consistent with the Consultant’s observations during its site visits shall be subject to any noted qualifications by the Consultant. Client understands that the frequency of the Consultant’s site visits may limit Consultant’s ability to review certain payment applications. Consultant’s review shall not be a representation that Consultant has supervised the work, or that Consultant has reviewed how or for what purpose Contractor has used or intends to use Owner’s payments. • Note: Construction Support Services shall be performed on a time and material basis to the budget amount indicated in the fee proposal. Services beyond the budget amount in the fee proposal shall be provided as a contract amendment with the City.
Optional Additional Task Items:
OPTIONAL TASK 1 ADDITONAL TOPOGRAPHIC FIELD SURVEY
The RFP states the City will provide a topographic survey in CAD format. Subconsultant (MBI) shall perform and prepare a conventional field topographic survey to locate, measure and describe existing planimetric and topographic features including definitive tops/toes of slopes, curbs, gutters and utilities that require additional accuracy or that could be obscured from aerial imagery. This includes any areas being affected by the proposed additions to the project site as well as paths of travel are being improved.
The survey will be compiled as a CADD readable file to be used by Consultant(s).
Additional design surveys or aerial topographic surveys of the whole park parcel, if needed, will be completed under a separate additional fee agreement.
• Underground Utilities Note: This Topographic Survey will be conducted in accordance with accepted industry standards. Unless otherwise indicated, only above ground utility appurtenances shall be located by Survey methods. Underground utilities or structures shown on the Grading Plan shall be considered as being reproduced from records supplied by the City and will not be verified for line or grade in any way during the course of this Survey. Other utilities may exist on this site which are not a part of the scope of work described herein and therefore shall not be shown on the Grading Plan. 1048
SCOPE OF SERVICES
Ground Penetrating Radar (GPR) will not be used in locating existing underground utilities. This can be proposed at a later date if it is determined that accurate locations of existing utilities via research with the City/County, utility purveyors and previous as-built plans within this area yield less than desirable results for approximating the locations of said utilities. Prior to any GPR work being performed, a separate Change Order to this agreement shall be executed by Consultant and client.
Deliverables:
o AutoCAD file of topographic field survey
OPTIONAL TASK 2 RECORD BASE MAP PREPARATION
To include and plot the record position of the project boundary in approximate orientation with a specific coordinate system, compiled aerial topographic base data or other overlay features, Subconsultant (MBI) shall perform the following tasks:
• MBI shall perform research of the available public records via on-line services to obtain maps and other items that affect the boundary location of the property; • MBI shall prepare a preliminary record data map to be used by the field survey crew to search for a sampling of boundary monuments;
• MBI shall perform a field survey of said monuments in order to establish orientation of the record survey data in relation to the coordinate system used in the topographic mapping; • MBI shall plot the record boundary lines on the aerial base map, with the understanding of the Client that said record boundary is NOT the result of a comprehensive boundary survey and analysis, and that it’s orientation may disagree substantially from the position determined by a full boundary survey and analysis;
• The budget for this scope of work is based upon an assumption that adequate and accessible boundary monumentation exists in the immediate project vicinity to control this record data survey. • Upon construction limits being defined, MBI shall plot only those easements affecting proposed limits of work. Said easements which are recorded and show up within a current and up-to-date Preliminary Title Report, a plat from the Title Company showing said easements affecting proposed work areas and all Schedule ‘B’ exceptions as stated in the Preliminary Title Report shall be plotted, if required.
Any cost associated with the preparation and processing of a Record of Survey Map, if one becomes necessary as a legal requirement, shall be covered by the City.
This task is not the preparation of a Constraints Map for the entire Park site. If this is requested by the City, MBI shall submit a separate proposal which shall include task descriptions and a schedule of fees prior to any work being prepared.
OPTIONAL TASK 3 HYDROLOGY AND HYDRAULICS REPORT
Subconsultant (MBI) shall prepare a Hydrology and Hydraulics Report for the Project in accordance with the requirements of the City of Palm Desert and the Riverside County Flood Control and Water Conservation District (RCFC&WCD) for submittal to the City. This report will finalize the determined onsite stormwater runoff calculations and the drainage facilities necessary to accommodate projected stormwater flows. Hydraulics for storm drain less than 12-inches shall be computed in normal depth conditions, while storm drain 12-inches and greater shall be analyzed using Water Surface Pressure 1049
SCOPE OF SERVICES
Gradient (WSPG) software. Up to three (3) main lines are anticipated to be analyzed using WSPG software to plot hydraulic grade lines. Offsite calculations are not included in this scope of work.
Deliverables:
o PDF of Hydrology and Hydraulics Report
OPTIONAL TASK 4 NPDES COMPLIANCE AND STORMWATER POLLUTION PREVENTION PLAN Subconsultant (MBI) shall prepare and submit a Notice of Intent (NOI) and a Stormwater Pollution Prevention Plan (SWPPP) for the Project to the State Water Resources Control Board (SWRCB). A copy of the SWPPP and the Waste Discharge Identification Number (WDID No.) shall be supplied to the client.
MBI shall comply with the Construction General Permit (CGP), 2022-0057-DWQ effective after September 1st, 2023. MBI shall comply with the CGP by preparing and submitting the project registration documents online to the SWRCB. These documents include a risk analysis and the SWPPP document.
This task assumes any further updates or actions necessary for upkeep, inspections, or maintenance of the SWPPP shall be prepared by the general contractor, erosion control contractor, or other party. This includes but is not limited to Annual Reporting, Rain Event Action Plans, Inspection Logs, Changes of Information, and the Notice of Termination.
Deliverables:
o PDF of SWPPP Report
OPTIONAL TASK 5 WATER QUALITY MANAGEMENT PLAN
Subconsultant (MBI) shall prepare a Final Water Quality Management Plan (WQMP) for the proposed project in accordance with Appendix H of the Whitewater River Region Stormwater Management Plan and be prepared using the Whitewater River Region template. Identification and as-needed calculations of all applicable structural BMPs, including source control, LID/site design, and treatment control BMPs shall be detailed in the final deliverable. The Final WQMP will include the required operation & maintenance agreements and owner’s certifications and shall be processed through the City of Palm Desert for approval. This task includes up to three (3) plan check revisions and does not account for major site plan changes.
Deliverables:
o PDF of WQMP Report
OPTIONAL TASK 6 PM-10 DUST MITIGATION PLAN
Subconsultant (MBI) shall prepare a PM-10 Fugitive Dust Plan per the requirements of the City of Palm Desert and the Southern California Air Quality Management District.
Deliverables:
o PDF of Dust Mitigation Plan
OPTIONAL TASK 7 GEOTECHNICAL REVIEW OF PLANS AND SPECIFICATIONS Upon request, subconsultant (Verdantas) can review draft plans and specifications pertaining to geotechnical aspects of this project. This proposal does not include geotechnical testing and observation 1050
SCOPE OF SERVICES
during construction or services during bidding to respond to contractor’s questions pertaining to geotechnical aspects of this project.
OPTIONAL TASK 8 SCE DRY UTILITY CONSULTING
Subconsultant (Koser) shall coordinate the designs, contracts, invoices and easements on behalf of the City, with Southern California Edison.
ASSUMPTIONS
Consultant’s obligations are based upon the following understanding:
1. Title Reports and supporting documents will be provided by the Client prior to commencing the services offered herein.
2. All fees and bonding premiums shall be at the Owner’s expense.
3. On-site storm drain systems, if any, will be private, owned and operated by the City.
4. Composite utilities shall be a private system for future operation and maintenance by the landowner. All said on-site water and sewer connections will be tied to CVWD main lines along the adjacent streets if said utilities are available. No mainlines are being proposed at this time.
5. A letter requesting the Hydraulic Modeling Analysis from the city/landowner shall be submitted to CVWD prior to the commencement of any Off and On-Site water and/or sewer design as stated herein.
EXCLUSIONS
Consulting services relating to any of the following tasks may be completed by Consultant(s) if negotiated under a separate contract for an additional fee; but are presently specifically excluded from the Agreement:
1. Traffic Studies, Traffic Counts, Intersection Studies and Traffic Signal Modifications;
2. Environmental Studies except those described herein;
3. Dry Utility design, coordination and Utility Potholing;
4. Plan and Map Check fees;
5. Acoustical Studies;
6. Retaining Wall, Perimeter Wall or Sound Wall Plans and/or Structural Design;
7. Technical Specifications other than notes on plans;
8. Services related to Hazardous Wastes and Hazardous Material Abatement and Environmental Issues;
9. Construction Surveying;
10. Mapping Services including but not limited to Legal descriptions, Record of Survey, Condominium Mapping or Parcel Maps.
11. Off-Site Water and Sewer Improvement Plans;
12. Traffic Control Plans;
13. Calculating Building Service line sizing (water, sewer and fire protection);
14. Building Fire Sprinkler Design and Calculations;
15. Preliminary Water Quality Management Plans;
16. Septic system design, layout or improvement plans;
17. Horizontal Control Plan;
18. Agencies fees;
19. Phase 2 or Phase 3 Environmental Audits;
20. Consultant does not make decisions for the client at the construction site other than for Consultant’s design/plan without their approval;
21. Any other services not specifically set forth in the above Scope of Services. 1051
STATEMENT OF QUALIFICATIONS
DRAFT SCHEDULE
1052
STATEMENT OF QUALIFICATIONS
E. APPENDIX - CLIENT TESTIMONIALS
1053
STATEMENT OF QUALIFICATIONS
“I have worked with In-Site Landscape Architecture, Inc for the past 5 years on the Sommers Bend residen!al development that includes over 460 acres, 1,506 residen!al units spread over 22 planning areas, and a sports park. During both the en!tlement and construc!on documents period of the project In-Site has been organized, responsive, and has addressed comments that has kept the project moving forward with delay. In-Site has worked close with City Staff and the City’s landscape consultant to produce appealing street scenes, front yard landscaping, and HOA maintained areas that are of the highest quality” Sco, Cooper, Associate Planner II
City of Temecula
“As the lead landscape architect on design and implementa!on at the Sommers Bend Master planned community, In-Site Landscape Architecture was instrumental in bringing the vision and needs of the client to reality. Their aTen!on to detail and ability to work seamlessly with all approval agencies and contractors lead to faster turnaround !mes on plan check approvals and the client’s construc!on schedule. The team offered cross func!onality at our development team mee!ngs with consultants and city that lead to being proac!ve to future issues that may have risen in the field. We are grateful to have In-Site involved in the design from the beginning to set the tone and look of the community that the residents will enjoy for years.” Trent Heiner, Senior Project Manager
Woodside Homes Southern California Division
“Having designed over 30 parks, plan checked over 70 parks and built over 50 parks over the last 25 years, I can truly say, In-Site Landscape Architecture is the highest quality design firm in the industry. Their overall professionalism is second to none. Great quality control, clear and legible accurate plans and expedient response !mes is unparalleled. Their ability to balance quality architecture with func!onal sustainable park designs, without incurring unnecessary expenses, provide value to the end user. In-Site has set a standard in landscape architecture that few can compare to.”
James Po,er, Vice President, Construc'on Division
Adame Landscape, Inc.
“It has been a pleasure working with the team at In-Site Landscape Architecture, Inc. Together we have worked on some very high profile projects that demanded a sophis!cated exper!se in land design. The professional staff at In-Site has been extremely aTen!ve to our client's program requirements and have integrated seamlessly with our architectural team to produce highly successful and crea!ve landscape design solu!ons. Their contribu!ons at client mee!ngs and in the prepara!on of presenta!on materials is the most professional consul!ng experience I've encountered in my over 40 years of prac!cing architecture.” Jake Schneider, AIA, CEO
Schneider Architectural Services, PC
Schneider Real Estate Services, LLC
Schneider Development Services, LLC
Schneider Construc!on Services, LLC
“I would like to express my full support and unreserved recommenda!on for In-Site Landscape Architecture. As co-lead designers of the Santa Rosa Plateau Ecological Reserve Visitor Center Improvement Project, they were instrumental in helping to enhance visitors’ experiences to the Reserve. With their exper!se in structural and public use design, a keen knowledge and apprecia!on of educa!onal/interpre!ve methods, and a personable and professional demeanor that was evident throughout the en!re project, they made the venture both successful and fulfilling. I would highly recommend their organiza!on and their skilled employees for any and all future projects.” Robert Hicks, Park Interpreter
Riverside County Regional Park and Open-Space District
CLIENT TESTIMONIALS
1054
STATEMENT OF QUALIFICATIONS
“When interviewing companies to partner with us on our Dynamic Vision Plan (our 20-year Park and Campground Vision Plan), In-Site Landscape Architecture, Inc. was the unanimous pick due to their reputa!on in the industry, quality work, and enthusias!c interest in our project. The In-Site team did not disappoint. Personally, it was a thrill to work with a team who understood vision planning and embraced exploring our Park's future through an innova- !ve lens.”
Laura Evans, Director of Park and Recrea'on
Santee Lakes Recrea!on Preserve
“We highly recommend working with In-Site Landscape Architecture. From park planning to parking lots, In-Site is a one stop shop for tasteful, prac!cal and crea!ve design solu!ons for exterior land and streetscapes. They are able to understand the client’s big picture plan and execute it with the required details. Tim is easy to work with and really listens to his clients to find the best solu!ons.” Leslie Zemsky, Vice President
Larkin Development Group
“Adding In-site Landscape Architecture to our project team has be a truly great benefit to our firm, and our clients.
Tim and his team brings stunning design and rendering imagery to the site and building exterior development of projects. In-site is our go to Landscape Architect firm.” Thomas R. Kujawa, AIA
Schneider Architectural Services, PC
“We have u!lized In-Site and Tim Jachlewski before he formed In-Site for over 19 years. He is always crea!ve and reliable. Schedules and budgets on large projects are key elements in keeping !melines and project financial projec!ons on plan. Beyond the numbers is the interac!on with other consultants and most importantly the government agencies. In all areas In-Site has and con!nues to excel. In the school of thought that a consultant doesn’t cost you but saves you money, we are fortunate to have the availability of their services.” Rob Honer, Principal and Wade Hall, Principal
Ambient Communi!es
“Thank you for your integrity and exper!se. Not only have you been a true pleasure to work with but the results are above and beyond expecta!ons. You have captured my vision.” Debera Nelson
Fossanova Vineyards and Estate
“It has been a pleasure to work with In-Site Landscape Architecture. They are the type of Firm that you can truly call a partner; they honor their commitments and are there to assist you every step of the way. I can truly tell you that having In-Site on the team helped the project move forward smoothly in the midst of some very tough challenges. We look forward to working with In-Site again in the near future”.
Samer K. Kawar, AIA, CDT, Associate / Lead Architect
BCA Architects
“The lion’s share of the Griffin Club design fell on In-Site. It was such a pleasure working with your company. That en!re team was awesome and a truly unique experience in my career. You are one of our best consultants.” Larry Liebel, Project Manager
Lennar
CLIENT TESTIMONIALS
1055
STATEMENT OF QUALIFICATIONS
“In Site was retained to be a key part of designing and construc!ng the Griffin Club in La Quinta, CA. Working with Tim and his team was a real joy. Their design and technical skills are second to none, and they consistently work to keep any detail from falling through the cracks. What a great addi!on to the team.” Sco, McFerran, Owner’s Representa've
Decatur Advisors LLC
“The Rock Church and Academy Project was a 206,000 square-foot re-use of the exis!ng Naval Training Center.
Tim was the Landscape Architect that took an original landscape concept that was prepared by a third party and completely redesigned the exterior component of the project so that it took on the same level of Biblical significance as the sanctuary and other key elements in the building design. We now have an exterior with a purpose. It does everything we wanted it to do and it serves as a beau!ful entry point into Liberty Sta!on as well. We are well pleased.”
Miles McPherson, Senior Pastor
Rock Church
“I’ve worked with In-Site Landscape Architecture on Winery projects in the Temecula Wine Country. The firm has provided high quality exper!se and aTen!on to detail that has made our projects stand out from the rest. The company’s hands on approach and commitment to the success of the project are second to none.” Bradley Hay
Hunsaker & Associates Engineers
“My leadership team had the pleasure of working with In-Site Landscape Architecture to redesign our preschool playground. Tim also worked with our previous leadership to successfully design our Elementary and Upper School playgrounds. We found him to be a man of his word, conscious of mee!ng deadlines, and staying within our schools budgetary constraints. He and his staff have the knowledge and crea!ve ability to be cuHng edge, while being mindful of student safety, and mee!ng or exceeding specific school building code requirements. We look forward to working with him in the near future.”
Sco, Marshall, Headmaster
Rock Academy
“We knew we loved the loca!on of our newly purchased building, but the property offered nothing aesthe!cally pleasing. In-Site Landscape Architecture, Inc. took the !me to listen to our vision for the property and to understand our business. The result is a beau!fully landscaped and serene outdoor area that supports our work with families and our love of nature. Our employees love to relax outdoors during breaks. Most importantly, however, this area created an extension of our usable space for entertaining clients and the women who help infer!le families have babies. They even brought in some fun aspects for the children who o`en visit. We highly recommend In -Site Landscape Architecture, Inc. as a company that values your vision and ideas while bringing in their own exper- !se to design and transform your property.”
Darlene M. Pinkerton, Founder and CEO
A Perfect Match, Inc., Allison Avenue Office Building
“We worked with In-Site Landscape Architecture on two design/build proposals (schema!c phases) for Sharp Cancer Center and Sharp Downtown Wellness Center and were very pleased with their commitment to the team and their crea!vity. Tim has an excep!onal ability to read an owner and transform that understanding into a beau!ful design while remaining vigilant of the budget.”
Dennis J. Uthe, LEED AP,
Hensel Phelps Construc!on Co.
CLIENT TESTIMONIALS
1056
STATEMENT OF QUALIFICATIONS
“I worked directly with Tim Jachlewski (while he was with his previous firm) on a design-build library project and it was the most pleasurable experience I have had working with a Landscape Architect. The project afforded opportuni!es for crea!vity through landscape design which is where Tim truly shines. His ideas for crea!ng a visual garden for children to interact with landscaping through using children’s books and characters was refreshing and fun.
When it came to produc!on, coordina!on, and mee!ng the design schedule, Tim was always on top of his game. I highly recommend hiring In-Site Landscape Architecture as part of your design team.” Daren Laub, C.W. Driver
Builders Since 1919
"We have had the pleasure of working and collabora!ng with In-Site Landscape Architecture on a number of landscape projects over the years. From large scale plans to small renderings, In-Site has provided a high end product our customers enjoy. As contractors, we also appreciate the open communica!on and !mely performance In-Site offers. It's not o`en you find a group as honest, dedicated and educated as In-Site!"
Ryan Hoover, Cer'fied Water Manager, CLT, QAC
Heritage Landscape Services
“I worked with Tim on the Veteran’s Park Master Plan and Recrea!on Center in Chula Vista. He is a talented designer and follows through with concise construc!on documents and clear direc!on. He is a good communicator and will be an asset to your design team.”
Bill Karrasch, Architect
Roesling Nakamura Terada Architects, Inc.
“We contracted with In-Site Landscape Architecture for the redesign our 13-acre Courthome landscape. The ini!al phase was to develop an overall landscape theme and then proceed with a detailed plan for each cul-de-sac. It was a pleasure doing business with Tim. His professionalism, talent, con!nuous support and knowledge of drought tolerant plants were outstanding. A job well done. I highly recommend In-Site for any landscape architecture project.
Bob Derman
Vice President and Landscape CommiTee Chairmen
Villa Dominique Courthomes, San Diego, Ca.
CLIENT TESTIMONIALS
1057
In-Site Landscape Architecture, Inc.
Fee Proposal- CPK00004 Hovely Soccer Park
Sub Total Total
TASK I – PUBLIC ENGAGEMENT
1. PROJECT INITIATION
1.A-Kickoff meeting $1,540.00
1.B-Monthy Meetings, adendas, minutes $5,280.00
1. PROJECT INITIATION $6,820.00
2. REVIEW AND DATA COLLECTION
2.A-Site Visits $2,760.00
2.B-Base Map $1,400.00
2.C-Memo of existing conditions issues $1,140.00
2. REVIEW AND DATA COLLECTION $5,300.00
3. PUBLIC ENGAGEMENT PLAN
3.A-Public Engagement Plan $1,685.50
3.B-Meeting w/ City and Parks and Rec. Committee 1 $880.00
3.C-Meeting w/ City and Parks and Rec. Committee 2 $880.00
3.D-Public Workshop Meeting and Online Survey $2,625.50
3.E-Public Data $1,400.00
3.F-Memorandum of consultant recommendations $880.00
3. PUBLIC ENGAGEMENT PLAN $8,351.00
4. PUBLIC ENGAGEMENT REPORT
3.A-Public Engagement Report $1,140.00
4. PUBLIC ENGAGEMENT REPORT $1,140.00
TASK II – PRELIMINARY PLANNING & DESIGN
5. CONCEPTUAL DESIGN
5.A-Conceptual Design $12,400.00
5.B-Park and Rec Committee Meeting $1,140.00
5.C-City Council Meeting $1,140.00
5. CONCEPTUAL DESIGN $14,680.00
6. PRELIMINARY COST ESTIMATE AND TIMELINE
6.A-Opinion of Cost Estimate $3,790.00
6.B-Schedule $700.00
6. PRELIMINARY COST ESTIMATE $4,490.00
TASK III – CONSTRUCTION DOCUMENTS
7. Project Management & Coordination $12,931.00
7.A-Geotechnical Investgation $6,160.00
7.B-Title Sheet $1,060.00
7.C-Demolition Plans $2,700.00
7.D-Site Construction Plans $13,520.00
7.E-Precise Grading and Drainage Plans $20,548.00
7.F-Composite Utility plans N/A
7.G-Landscape Planting Plans $10,600.00
7.H-Irrigation Plans $9,480.00
7.I-Site Lighting and Electrical Plans $9,900.00
7.J-Restroom Building (Coordination with Romtec) N/A
7.K-Updated Opinion of Cost Estimate $1,360.00
7. Construction Documents $88,259.00
8. Environmental Review
8.A-Draft and Final Notice of Exemption
8. Environmental Review N/A
9. Management Plan
1058
9.A-Management Plan
9. Management Plan N/A
TASK IV – BIDDING/ CONSTRUCTION SUPPORT
10.A-Pre-Bid Meeting $700.00
10.B- Bidding $2,440.00
10. Bidding $3,140.00
11. Construction Support
11.A-Pre construction meeting $440.00
11.B-Respond to RFI's $1,400.00
11.C-Submittal Review $2,440.00
11.D-Field Observations (two visists budgeted) $1,920.00
11.E-Punch List Walk $1,400.00
11.F-Post Punch List Walk $1,400.00
11-Civil subconsultant Construction Support (upto 40 hours) $10,274.00 11-Electrical subconsultant Construction Support $2,750.00
11.G-As-Built Drawings $12,062.00
11. Construction Support $34,086.00
Total Hours per staff member
Reimbursables $10,000.00
Total $176,266.00
OPTIONAL ADDITIONAL SERVICES
OPTIONAL TASK 1-ADDITONAL TOPOGRAPHIC FIELD SURVEY $10,593.00 OPTIONAL TASK 2-RECORD BASE MAP PREPARATION $8,844.00
OPTIONAL TASK 3-HYDROLOGY AND HYDRAULICS REPORT $8,778.00 OPTIONAL TASK 4-NPDES COMPLIANCE AND SWPPP $9,108.00
OPTIONAL TASK 5-WATER QUALITY MANAGEMENT PLAN N/A
OPTIONAL TASK 6-PM-10 DUST MITIGATION PLAN $6,985.00
OPTIONAL TASK 7-GEOTECHNICAL REVIEW OF PLANS $2,475.00
OPTIONAL 7.E-Soccer Fields Additional Survey $28,875.00 OPTIONAL 7.E-Soccer Fields Precise Grading and Drainage Plans $41,415.00 1059
In-Site Landscape Architecture, Inc.
Fee Proposal- CPK00005 Homme Adams Park
Sub Total Total
TASK I – PUBLIC ENGAGEMENT
1. PROJECT INITIATION
1.A-Kickoff meeting $1,540.00
1.B-Monthy Meetings, adendas, minutes $5,280.00
1. PROJECT INITIATION $6,820.00
2. REVIEW AND DATA COLLECTION
2.A-Site Visits $2,760.00
2.B-Base Map $1,400.00
2.C-Memo of existing conditions issues $1,140.00
2. REVIEW AND DATA COLLECTION $5,300.00
3. PUBLIC ENGAGEMENT PLAN
3.A-Public Engagement Plan $1,685.50
3.B-Meeting w/ City and Parks and Rec. Committee 1 $880.00
3.C-Meeting w/ City and Parks and Rec. Committee 2 $880.00
3.D-Public Workshop Meeting and Online Survey $2,625.50
3.E-Public Data $1,400.00
3.F-Memorandum of consultant recommendations $880.00
3. PUBLIC ENGAGEMENT PLAN $8,351.00
4. PUBLIC ENGAGEMENT REPORT
3.A-Public Engagement Report $1,140.00
4. PUBLIC ENGAGEMENT REPORT $1,140.00
TASK II – PRELIMINARY PLANNING & DESIGN
5. CONCEPTUAL DESIGN
5.A-Conceptual Design $14,820.00
5.B-Park and Rec Committee Meeting $1,140.00
5.C-City Council Meeting $1,140.00
5. CONCEPTUAL DESIGN $17,100.00
6. PRELIMINARY COST ESTIMATE AND TIMELINE
6.A-Opinion of Cost Estimate $3,790.00
6.B-Schedule $700.00
6. PRELIMINARY COST ESTIMATE $4,490.00
TASK III – CONSTRUCTION DOCUMENTS
7. Project Management & Coordination $12,931.00
7.A-Geotechnical Investgation $7,920.00
7.B-Title Sheet $1,060.00
7.C-Demolition Plans $1,660.00
7.D-Site Construction Plans $20,280.00
7.E-Precise Grading and Drainage Plans $42,592.00
7.F-Composite Utility plans $18,230.00
7.G-Landscape Planting Plans $7,760.00
7.H-Irrigation Plans $6,880.00
7.I-Site Lighting and Electrical Plans $12,100.00
7.J-Restroom Building (Coordination with Romtec) $3,000.00
7.K-Updated Opinion of Cost Estimate $1,360.00
7. Construction Documents $135,773.00
8. Environmental Review
8.A-Draft and Final Notice of Exemption $2,618.00
8. Environmental Review $2,618.00
9. Management Plan
1060
9.A-Management Plan $3,520.00
9. Management Plan $3,520.00
TASK IV – BIDDING/ CONSTRUCTION SUPPORT
10.A-Pre-Bid Meeting $700.00
10.B- Bidding $2,440.00
10. Bidding $3,140.00
11. Construction Support
11.A-Pre construction meeting $440.00
11.B-Respond to RFI's $1,400.00
11.C-Submittal Review $2,440.00
11.D-Field Observations (two visists budgeted) $1,920.00
11.E-Punch List Walk $1,400.00
11.F-Post Punch List Walk $1,400.00
11-Civil subconsultant Construction Support (upto 40 hours) $10,274.00 11-Electrical subconsultant Construction Support $2,750.00
11.G-As-Built Drawings $12,062.00
11. Construction Support $34,086.00
Reimbursables $10,000.00
Total $232,338.00
OPTIONAL ADDITIONAL SERVICES
OPTIONAL TASK 1-ADDITONAL TOPOGRAPHIC FIELD SURVEY $19,701.00 OPTIONAL TASK 2-RECORD BASE MAP PREPARATION $8,844.00
OPTIONAL TASK 3-HYDROLOGY AND HYDRAULICS REPORT $10,428.00 OPTIONAL TASK 4-NPDES COMPLIANCE AND SWPPP $9,108.00
OPTIONAL TASK 5-WATER QUALITY MANAGEMENT PLAN $10,098.00 OPTIONAL TASK 6-PM-10 DUST MITIGATION PLAN $8,602.00
OPTIONAL TASK 7-GEOTECHNICAL REVIEW OF PLANS $2,475.00
OPTIONAL TASK 8-SCE ELECTRICAL SERVICE $6,050.00
1061
In-Site Landscape Architecture, Inc.
Fee Proposal- CPK00006 University Park
Sub Total Total
TASK I – PUBLIC ENGAGEMENT
1. PROJECT INITIATION
1.A-Kickoff meeting $1,540.00
1.B-Monthy Meetings, adendas, minutes $5,280.00
1. PROJECT INITIATION $6,820.00
2. REVIEW AND DATA COLLECTION
2.A-Site Visits $2,760.00
2.B-Base Map $1,400.00
2.C-Memo of existing conditions issues $1,140.00
2. REVIEW AND DATA COLLECTION $5,300.00
3. PUBLIC ENGAGEMENT PLAN
3.A-Public Engagement Plan $1,685.50
3.B-Meeting w/ City and Parks and Rec. Committee 1 $880.00
3.C-Meeting w/ City and Parks and Rec. Committee 2 $880.00
3.D-Public Workshop Meeting and Online Survey $2,625.50
3.E-Public Data $1,400.00
3.F-Memorandum of consultant recommendations $880.00
3. PUBLIC ENGAGEMENT PLAN $8,351.00
4. PUBLIC ENGAGEMENT REPORT
3.A-Public Engagement Report $1,140.00
4. PUBLIC ENGAGEMENT REPORT $1,140.00
TASK II – PRELIMINARY PLANNING & DESIGN
5. CONCEPTUAL DESIGN
5.A-Conceptual Design $9,220.00
5.B-Park and Rec Committee Meeting $1,140.00
5.C-City Council Meeting $1,140.00
5. CONCEPTUAL DESIGN $11,500.00
6. PRELIMINARY COST ESTIMATE AND TIMELINE
6.A-Opinion of Cost Estimate $3,790.00
6.B-Schedule $700.00
6. PRELIMINARY COST ESTIMATE $4,490.00
TASK III – CONSTRUCTION DOCUMENTS
7. Project Management & Coordination $12,211.00
7.A-Geotechnical Investgation $6,160.00
7.B-Title Sheet $1,060.00
7.C-Demolition Plans $2,700.00
7.D-Site Construction Plans $11,440.00
7.E-Precise Grading and Drainage Plans $20,548.00
7.F-Composite Utility plans N/A
7.G-Landscape Planting Plans $5,520.00
7.H-Irrigation Plans $4,080.00
7.I-Site Lighting and Electrical Plans $6,600.00
7.J-Restroom Building (Coordination with Romtec) N/A
7.K-Updated Opinion of Cost Estimate $1,360.00
7. Construction Documents $71,679.00
8. Environmental Review
8.A-Draft and Final Notice of Exemption
8. Environmental Review N/A
9. Management Plan
1062
9.A-Management Plan
9. Management Plan N/A
TASK IV – BIDDING/ CONSTRUCTION SUPPORT
10.A-Pre-Bid Meeting $700.00
10.B- Bidding $2,440.00
10. Bidding $3,140.00
11. Construction Support
11.A-Pre construction meeting $440.00
11.B-Respond to RFI's $1,400.00
11.C-Submittal Review $2,440.00
11.D-Field Observations (two visists budgeted) $1,920.00
11.E-Punch List Walk $1,400.00
11.F-Post Punch List Walk $1,400.00
11-Civil subconsultant Construction Support (upto 40 hours) $10,274.00 11-Electrical subconsultant Construction Support $1,650.00
11.G-As-Built Drawings $12,062.00
11. Construction Support $32,986.00
Reimbursables $10,000.00
Total $155,406.00
OPTIONAL ADDITIONAL SERVICES
OPTIONAL TASK 1-ADDITONAL TOPOGRAPHIC FIELD SURVEY $10,593.00 OPTIONAL TASK 2-RECORD BASE MAP PREPARATION $8,844.00
OPTIONAL TASK 3-HYDROLOGY AND HYDRAULICS REPORT $8,778.00 OPTIONAL TASK 4-NPDES COMPLIANCE AND SWPPP $9,108.00
OPTIONAL TASK 5-WATER QUALITY MANAGEMENT PLAN N/A
OPTIONAL TASK 6-PM-10 DUST MITIGATION PLAN $6,985.00
OPTIONAL TASK 7-GEOTECHNICAL REVIEW OF PLANS $2,475.00
1063
In-Site Landscape Architecture, Inc.
Fee Proposal- CPK00008 Washington Charter
Sub Total Total
TASK I – PUBLIC ENGAGEMENT
1. PROJECT INITIATION
1.A-Kickoff meeting $1,540.00
1.B-Monthy Meetings, adendas, minutes $5,280.00
1. PROJECT INITIATION $6,820.00
2. REVIEW AND DATA COLLECTION
2.A-Site Visits $2,760.00
2.B-Base Map $1,400.00
2.C-Memo of existing conditions issues $1,140.00
2. REVIEW AND DATA COLLECTION $5,300.00
3. PUBLIC ENGAGEMENT PLAN
3.A-Public Engagement Plan $1,685.50
3.B-Meeting w/ City and Parks and Rec. Committee 1 $880.00
3.C-Meeting w/ City and Parks and Rec. Committee 2 $880.00
3.D-Public Workshop Meeting and Online Survey $2,625.50
3.E-Public Data $1,400.00
3.F-Memorandum of consultant recommendations $880.00
3. PUBLIC ENGAGEMENT PLAN $8,351.00
4. PUBLIC ENGAGEMENT REPORT
3.A-Public Engagement Report $1,140.00
4. PUBLIC ENGAGEMENT REPORT $1,140.00
TASK II – PRELIMINARY PLANNING & DESIGN
5. CONCEPTUAL DESIGN
5.A-Conceptual Design $9,220.00
5.B-Park and Rec Committee Meeting $1,140.00
5.C-City Council Meeting $1,140.00
5. CONCEPTUAL DESIGN $11,500.00
6. PRELIMINARY COST ESTIMATE AND TIMELINE
6.A-Opinion of Cost Estimate $3,790.00
6.B-Schedule $700.00
6. PRELIMINARY COST ESTIMATE $4,490.00
TASK III – CONSTRUCTION DOCUMENTS
7. Project Management & Coordination $12,211.00
7.A-Geotechnical Investgation $6,160.00
7.B-Title Sheet $1,060.00
7.C-Demolition Plans $2,700.00
7.D-Site Construction Plans $11,440.00
7.E-Precise Grading and Drainage Plans $24,585.00
7.F-Composite Utility plans N/A
7.G-Landscape Planting Plans $5,520.00
7.H-Irrigation Plans $4,080.00
7.I-Site Lighting and Electrical Plans $6,600.00
7.J-Restroom Building (Coordination with Romtec) N/A
7.K-Updated Opinion of Cost Estimate $1,360.00
7. Construction Documents $75,716.00
8. Environmental Review
8.A-Draft and Final Notice of Exemption
8. Environmental Review N/A
9. Management Plan
1064
9.A-Management Plan
9. Management Plan N/A
TASK IV – BIDDING/ CONSTRUCTION SUPPORT
10.A-Pre-Bid Meeting $700.00
10.B- Bidding $2,440.00
10. Bidding $3,140.00
11. Construction Support
11.A-Pre construction meeting $440.00
11.B-Respond to RFI's $1,400.00
11.C-Submittal Review $2,440.00
11.D-Field Observations (two visists budgeted) $1,920.00
11.E-Punch List Walk $1,400.00
11.F-Post Punch List Walk $1,400.00
11-Civil subconsultant Construction Support (upto 40 hours) $10,274.00 11-Electrical subconsultant Construction Support $1,650.00
11.G-As-Built Drawings $12,062.00
11. Construction Support $32,986.00
Reimbursables $10,000.00
Total $159,443.00
OPTIONAL ADDITIONAL SERVICES
OPTIONAL TASK 1-ADDITONAL TOPOGRAPHIC FIELD SURVEY $15,367.00 OPTIONAL TASK 2-RECORD BASE MAP PREPARATION $8,844.00
OPTIONAL TASK 3-HYDROLOGY AND HYDRAULICS REPORT $8,778.00 OPTIONAL TASK 4-NPDES COMPLIANCE AND SWPPP $9,108.00
OPTIONAL TASK 5-WATER QUALITY MANAGEMENT PLAN N/A
OPTIONAL TASK 6-PM-10 DUST MITIGATION PLAN $7,799.00
OPTIONAL TASK 7-GEOTECHNICAL REVIEW OF PLANS $2,475.00
1065
In-Site Landscape Architecture, Inc.
Fee Proposal- CPK00009 Randall Henderson Trailhead
Sub Total Total
TASK I – PUBLIC ENGAGEMENT
1. PROJECT INITIATION
1.A-Kickoff meeting $1,540.00
1.B-Monthy Meetings, adendas, minutes $5,280.00
1. PROJECT INITIATION $6,820.00
2. REVIEW AND DATA COLLECTION
2.A-Site Visits $2,760.00
2.B-Base Map $1,400.00
2.C-Memo of existing conditions issues $1,140.00
2. REVIEW AND DATA COLLECTION $5,300.00
3. PUBLIC ENGAGEMENT PLAN
3.A-Public Engagement Plan $1,685.50
3.B-Meeting w/ City and Parks and Rec. Committee 1 $880.00
3.C-Meeting w/ City and Parks and Rec. Committee 2 $880.00
3.D-Public Workshop Meeting and Online Survey $2,625.50
3.E-Public Data $1,400.00
3.F-Memorandum of consultant recommendations $880.00
3. PUBLIC ENGAGEMENT PLAN $8,351.00
4. PUBLIC ENGAGEMENT REPORT
3.A-Public Engagement Report $1,140.00
4. PUBLIC ENGAGEMENT REPORT $1,140.00
TASK II – PRELIMINARY PLANNING & DESIGN
5. CONCEPTUAL DESIGN
5.A-Conceptual Design $14,820.00
5.B-Park and Rec Committee Meeting $1,140.00
5.C-City Council Meeting $1,140.00
5. CONCEPTUAL DESIGN $17,100.00
6. PRELIMINARY COST ESTIMATE AND TIMELINE
6.A-Opinion of Cost Estimate $3,790.00
6.B-Schedule $700.00
6. PRELIMINARY COST ESTIMATE $4,490.00
TASK III – CONSTRUCTION DOCUMENTS
7. Project Management & Coordination $12,931.00
7.A-Geotechnical Investgation $7,920.00
7.B-Title Sheet $1,060.00
7.C-Demolition Plans $1,660.00
7.D-Site Construction Plans $20,280.00
7.E-Precise Grading and Drainage Plans $42,152.00
7.F-Composite Utility plans $17,810.00
7.G-Landscape Planting Plans $7,760.00
7.H-Irrigation Plans $6,880.00
7.I-Site Lighting and Electrical Plans $12,100.00
7.J-Restroom Building (Coordination with Romtec) $3,000.00
7.K-Updated Opinion of Cost Estimate $1,360.00
7. Construction Documents $134,913.00
8. Environmental Review
8.A-Draft and Final Notice of Exemption $2,618.00
8. Environmental Review $2,618.00
9. Management Plan
1066
9.A-Management Plan $3,520.00
9. Management Plan $3,520.00
TASK IV – BIDDING/ CONSTRUCTION SUPPORT
10.A-Pre-Bid Meeting $700.00
10.B- Bidding $2,440.00
10. Bidding $3,140.00
11. Construction Support
11.A-Pre construction meeting $440.00
11.B-Respond to RFI's $1,400.00
11.C-Submittal Review $2,440.00
11.D-Field Observations (two visists budgeted) $1,920.00
11.E-Punch List Walk $1,400.00
11.F-Post Punch List Walk $1,400.00
11-Civil subconsultant Construction Support (upto 40 hours) $10,274.00 11-Electrical subconsultant Construction Support $2,750.00
11.G-As-Built Drawings $12,062.00
11. Construction Support $34,086.00
Reimbursables $10,000.00
Total $231,478.00
OPTIONAL ADDITIONAL SERVICES
OPTIONAL TASK 1-ADDITONAL TOPOGRAPHIC FIELD SURVEY $10,021.00 OPTIONAL TASK 2-RECORD BASE MAP PREPARATION $8,844.00
OPTIONAL TASK 3-HYDROLOGY AND HYDRAULICS REPORT $10,428.00 OPTIONAL TASK 4-NPDES COMPLIANCE AND SWPPP $9,108.00
OPTIONAL TASK 5-WATER QUALITY MANAGEMENT PLAN $10,098.00 OPTIONAL TASK 6-PM-10 DUST MITIGATION PLAN $8,074.00
OPTIONAL TASK 7-GEOTECHNICAL REVIEW OF PLANS $2,475.00
OPTIONAL TASK 8-SCE ELECTRICAL SERVICE $6,050.00
1067
In-Site Landscape Architecture, Inc.
Fee Proposal- MPK00001 Freedom Park
Sub Total Total
TASK I – PUBLIC ENGAGEMENT
1. PROJECT INITIATION
1.A-Kickoff meeting $1,540.00
1.B-Monthy Meetings, adendas, minutes $5,280.00
1. PROJECT INITIATION $6,820.00
2. REVIEW AND DATA COLLECTION
2.A-Site Visits $2,760.00
2.B-Base Map $1,400.00
2.C-Memo of existing conditions issues $1,140.00
2. REVIEW AND DATA COLLECTION $5,300.00
3. PUBLIC ENGAGEMENT PLAN
3.A-Public Engagement Plan $1,685.50
3.B-Meeting w/ City and Parks and Rec. Committee 1 $880.00
3.C-Meeting w/ City and Parks and Rec. Committee 2 $880.00
3.D-Public Workshop Meeting and Online Survey $2,625.50
3.E-Public Data $1,400.00
3.F-Memorandum of consultant recommendations $880.00
3. PUBLIC ENGAGEMENT PLAN $8,351.00
4. PUBLIC ENGAGEMENT REPORT
3.A-Public Engagement Report $1,140.00
4. PUBLIC ENGAGEMENT REPORT $1,140.00
TASK II – PRELIMINARY PLANNING & DESIGN
5. CONCEPTUAL DESIGN
5.A-Conceptual Design $9,220.00
5.B-Park and Rec Committee Meeting $1,140.00
5.C-City Council Meeting $1,140.00
5. CONCEPTUAL DESIGN $11,500.00
6. PRELIMINARY COST ESTIMATE AND TIMELINE
6.A-Opinion of Cost Estimate $3,790.00
6.B-Schedule $700.00
6. PRELIMINARY COST ESTIMATE $4,490.00
TASK III – CONSTRUCTION DOCUMENTS
7. Project Management & Coordination $12,211.00
7.A-Geotechnical Investgation $6,160.00
7.B-Title Sheet $1,060.00
7.C-Demolition Plans $2,700.00
7.D-Site Construction Plans $11,440.00
7.E-Precise Grading and Drainage Plans $33,715.00
7.F-Composite Utility plans N/A
7.G-Landscape Planting Plans $5,520.00
7.H-Irrigation Plans $4,080.00
7.I-Site Lighting and Electrical Plans $6,600.00
7.J-Restroom Building (Coordination with Romtec) N/A
7.K-Updated Opinion of Cost Estimate $1,360.00
7. Construction Documents $84,846.00
8. Environmental Review
8.A-Draft and Final Notice of Exemption
8. Environmental Review N/A
9. Management Plan
1068
9.A-Management Plan
9. Management Plan N/A
TASK IV – BIDDING/ CONSTRUCTION SUPPORT
10.A-Pre-Bid Meeting $700.00
10.B- Bidding $2,440.00
10. Bidding $3,140.00
11. Construction Support
11.A-Pre construction meeting $440.00
11.B-Respond to RFI's $1,400.00
11.C-Submittal Review $2,440.00
11.D-Field Observations (two visists budgeted) $1,920.00
11.E-Punch List Walk $1,400.00
11.F-Post Punch List Walk $1,400.00
11-Civil subconsultant Construction Support (upto 40 hours) $10,274.00 11-Electrical subconsultant Construction Support $1,650.00
11.G-As-Built Drawings $12,062.00
11. Construction Support $32,986.00
Reimbursables $10,000.00
Total $168,573.00
OPTIONAL ADDITIONAL SERVICES
OPTIONAL TASK 1-ADDITONAL TOPOGRAPHIC FIELD SURVEY $10,593.00 OPTIONAL TASK 2-RECORD BASE MAP PREPARATION $8,844.00
OPTIONAL TASK 3-HYDROLOGY AND HYDRAULICS REPORT $8,778.00 OPTIONAL TASK 4-NPDES COMPLIANCE AND SWPPP $9,108.00
OPTIONAL TASK 5-WATER QUALITY MANAGEMENT PLAN N/A
OPTIONAL TASK 6-PM-10 DUST MITIGATION PLAN $8,327.00
OPTIONAL TASK 7-GEOTECHNICAL REVIEW OF PLANS $2,475.00
1069
In-Site Landscape Architecture, Inc.
Fee Proposal- MPK00008 Ironwood Park
Sub Total Total
TASK I – PUBLIC ENGAGEMENT
1. PROJECT INITIATION
1.A-Kickoff meeting $1,540.00
1.B-Monthy Meetings, adendas, minutes $5,280.00
1. PROJECT INITIATION $6,820.00
2. REVIEW AND DATA COLLECTION
2.A-Site Visits $2,760.00
2.B-Base Map $1,400.00
2.C-Memo of existing conditions issues $1,140.00
2. REVIEW AND DATA COLLECTION $5,300.00
3. PUBLIC ENGAGEMENT PLAN
3.A-Public Engagement Plan $1,685.50
3.B-Meeting w/ City and Parks and Rec. Committee 1 $880.00
3.C-Meeting w/ City and Parks and Rec. Committee 2 $880.00
3.D-Public Workshop Meeting and Online Survey $2,625.50
3.E-Public Data $1,400.00
3.F-Memorandum of consultant recommendations $880.00
3. PUBLIC ENGAGEMENT PLAN $8,351.00
4. PUBLIC ENGAGEMENT REPORT
3.A-Public Engagement Report $1,140.00
4. PUBLIC ENGAGEMENT REPORT $1,140.00
TASK II – PRELIMINARY PLANNING & DESIGN
5. CONCEPTUAL DESIGN
5.A-Conceptual Design $9,220.00
5.B-Park and Rec Committee Meeting $1,140.00
5.C-City Council Meeting $1,140.00
5. CONCEPTUAL DESIGN $11,500.00
6. PRELIMINARY COST ESTIMATE AND TIMELINE
6.A-Opinion of Cost Estimate $3,790.00
6.B-Schedule $700.00
6. PRELIMINARY COST ESTIMATE $4,490.00
TASK III – CONSTRUCTION DOCUMENTS
7. Project Management & Coordination $12,211.00
7.A-Geotechnical Investgation $6,820.00
7.B-Title Sheet $1,060.00
7.C-Demolition Plans $2,700.00
7.D-Site Construction Plans $11,440.00
7.E-Precise Grading and Drainage Plans $29,678.00
7.F-Composite Utility plans N/A
7.G-Landscape Planting Plans $5,520.00
7.H-Irrigation Plans $4,080.00
7.I-Site Lighting and Electrical Plans $6,600.00
7.J-Restroom Building (Coordination with Romtec) N/A
7.K-Updated Opinion of Cost Estimate $1,360.00
7. Construction Documents $81,469.00
8. Environmental Review
8.A-Draft and Final Notice of Exemption
8. Environmental Review N/A
9. Management Plan
1070
9.A-Management Plan
9. Management Plan N/A
TASK IV – BIDDING/ CONSTRUCTION SUPPORT
10.A-Pre-Bid Meeting $700.00
10.B- Bidding $2,440.00
10. Bidding $3,140.00
11. Construction Support
11.A-Pre construction meeting $440.00
11.B-Respond to RFI's $1,400.00
11.C-Submittal Review $2,440.00
11.D-Field Observations (two visists budgeted) $1,920.00
11.E-Punch List Walk $1,400.00
11.F-Post Punch List Walk $1,400.00
11-Civil subconsultant Construction Support (upto 40 hours) $10,274.00 11-Electrical subconsultant Construction Support $1,650.00
11.G-As-Built Drawings $12,062.00
11. Construction Support $32,986.00
Reimbursables $10,000.00
Total $165,196.00
OPTIONAL ADDITIONAL SERVICES
OPTIONAL TASK 1-ADDITONAL TOPOGRAPHIC FIELD SURVEY $15,367.00 OPTIONAL TASK 2-RECORD BASE MAP PREPARATION $8,844.00
OPTIONAL TASK 3-HYDROLOGY AND HYDRAULICS REPORT $8,778.00 OPTIONAL TASK 4-NPDES COMPLIANCE AND SWPPP $9,108.00
OPTIONAL TASK 5-WATER QUALITY MANAGEMENT PLAN N/A
OPTIONAL TASK 6-PM-10 DUST MITIGATION PLAN $7,799.00
OPTIONAL TASK 7-GEOTECHNICAL REVIEW OF PLANS $2,475.00
1071
STATEMENT OF QUALIFICATIONS
TIM JACHLEWSKI JR.
Principal-in-Charge, PLA, ASLA
REGISTRATION
Licensed Landscape Architect,
California (#4547)
Licensed Landscape Architect,
North Carolina (#2341)
Registered Landscape Architect,
New York (#001646)
Registered Landscape Architect,
Texas (#4029)
ASSOCIATIONS
American Society of Landscape
Architects, 1994-Present
• President, SD Chapter, 2012
• President Elect, SD Chapter, 2011
• Vice President of Community
Outreach, SD Chapter, 2009-2011
A.C.E. Mentor – Patrick Henry High
School, 2009/2010
EDUCATION
B.L.A. (Bachelor of Landscape Architecture)
State University of N.Y. College of
Environmental Science and Forestry at
Syracuse University, 1994 (Rank: 1/55)
EXPERIENCE
30 years of landscape architectural professional prac!ce experience
2007-Present: President - In-Site Landscape Architecture, Inc. 2000-2007: Principal/ Project Manager - Van Dyke Landscape Architects, Inc.
1994-2000: Project Manager - Parsons Transporta!on Group of NY
Project related experience includes site analysis, community outreach, planning group and public agency presenta!ons/ approvals (Planning Commissions, City Councils, and California Coastal Commission), master planning, conceptual development, schema!c design, construc!on documents, construc!on administra!on/ observa!on. Experience also includes landscape architectural design for tenta!ve tract maps, specific plans, environmental impact reports, and landscape design guidelines.
Project types include parks and recrea!on, master planned communi!es, trails, environmental restora!on, streetscapes, mixed-use, urban planning, wineries, resorts, hotels, schools, libraries, churches, healthcare facili!es, commercial, residen!al, and governmental consul!ng throughout Southern California and Western New York.
Tim’s passion for design, art, and the environment fuel his goal of bringing “nature to people” in urbanized areas and “people to nature” in preserved environments. He understands the mental, emo!onal, and spiritual benefits of exposure to nature and excels at crea!ng func!onal, aesthe!cally pleasing, and ar!s!c outdoor environments that create, preserve, or enhance each project’s sense of place.
Tim served as president of the San Diego Chapter of the American Society of Landscape Architects and served on the Water Conserva!on Technical CommiTee as editor, contributor, or author for a number of Chapter posi!on papers including: “Water Conserva!on”, “The Value of Parks”, “Regionally Appropriate Landscapes”, “Use of Turf Grass”, “Vegeta!ve Erosion Control”, “The Value of Trees”, “Golf Course Water Conserva!on”, “HOA Water Conserva!on”, “Reclaimed, Recycled, and Re-purified Water”, “The Value of Na!ve Plants”, “Water Quality”, “Fire Safety and Landscaping”, “Grey Water and Rainwater Collec!on”, and “Revegeta!on/ Restora!on”.
Tim strives to provide crea!ve design solu!ons, clear graphic, wriTen, and verbal communica!on, and posi!ve professional chemistry with team members for all In-Site’s projects.
KEY PERSONNEL
1072
STATEMENT OF QUALIFICATIONS
Altair Central Park – Temecula, CA
Altair Couplet Park – Temecula, CA
Altair Village Parks - Temecula, CA
Aliso Canyon Park – Aliso Viejo, CA
Aqua!c Park at Winchester Ranch - Riverside, CA*
Arbor Ridge Community Park - Beaumont, CA*
Arboretum Park at Winchester Ranch - Riverside, CA*
Buffalo Outer Harbor Development Planning - Buffalo, NY** Delaware Park - Japanese Garden - Buffalo, NY**
Diamond Valley Lake - Recrea!onal Planning - Riverside, CA* Dog Park at Winchester Ranch - Riverside, CA*
Edison Avenue Linear Park and Trail – Chino, CA
El Caballo Park Master Plan – Escondido, CA
Farmers Market Park at Winchester Ranch - Riverside, CA* Fritz Burns Park - La Quinta, CA
Front Park - Buffalo, NY**
Galleron Park – Riverside, CA*
Gorgeview Park - Niagara Falls, NY**
Harvest Park (County of San Diego) – Valley Center, CA
JFK Park - Buffalo, NY**
Jones Point Park Enhancement Planning - Alexandria, VA** Lake Murray Park - Playground Ini!a!ve - San Diego, CA
Larkin Park – Buffalo, NY
LaSalle Park - Buffalo, NY**
Luz del Sol Park – San Jacinto, CA*
Madigan Park – Riverside, CA*
McCarthy Park - Buffalo, NY**
Mockingbird Ridge Passive Park - Riverside, CA*
Morgan Hill Park – Riverside, CA*
New York State Office of Parks, Recrea!on and Historic
Preserva!on – NY**
DeVaux State Park**
East River Wetlands Enhancement**
Ecotourism Ini!a!ve**
Goat Island State Park**
Joseph Davis State Park**
Knox Farm State Park**
Saint Mary of the Angels State Park**
Woodlawn Beach State Park**
Orchard Run Linear Park – Valley Center CA
Pacific Highlands Ranch Verana Park – San Diego, CA
Pacific Highlands Ranch Unit 27 Park – San Diego, CA
Pacific Highlands Ranch Unit 28 Park – San Diego, CA
Palma Village Park Improvements - Palm Desert, CA
Park Circle Private Linear Park – Valley Center, CA
Passive Park at Winchester Ranch - Riverside, CA*
Queen Anne’s Park – MD**
Rock Academy Preschool Park – San Diego, CA
Rock Church and Academy Park – San Diego, CA
Sacred Rocks Reserve – Boulevard, CA
Santa Rosa Plateau Visitor Center Project – Murrieta, CA Santee Lakes Recrea!on Preserve – Santee, CA
Shearwater Creek Pocket Park – Temecula, CA
Sikes Adobe Historic Farmstead Park Plan – Escondido, CA Solera Estates Park – Riverside CA
South Buffalo Redevelopment Plan - Buffalo, NY**
Sperry Park - Buffalo, NY**
Sports Ranch at Sommer Bend – Temecula, CA
Sunset Cliffs Natural Park Master Plan – San Diego, CA* Sycamore Canyon Park - San Diego, CA*
Villages of Old Town - Village Green – Temecula, CA*
Tijuana River Valley Regional Park – San Diego, CA*
Underground Railroad “Freedom Memorial”-Buffalo, NY**
Veterans Park and Community Center – Chula Vista, CA*
Village West Parks and Recrea!on – Temecula, CA*
Willert Park - Buffalo, NY**
Winchester Ranch Sports Park CD’s - Riverside, CA
Winchester Ranch Sports Park Master Plan- Riverside, CA* Yucaipa Regional Park – RV Campground Expansion – CA*
Community Recrea'on Centers
Arbor Ridge Recrea!on Center - Beaumont, CA*
Eclipse Recrea!on Center – Escondido, CA
Galloway Landing Recrea!on Center - Brunswick Co, NC
Morgan Hill Recrea!on Center - Riverside, CA*
Orchard Run Recrea!on Center North – Valley Center
Orchard Run Recrea!on Center South – Valley Center
Park Circle Recrea!on Center – Valley Center, CA
Shearwater Creek Recrea!on Center – Temecula, CA
Summerwind Ranch Recrea!on Center - Calimesa, CA*
The Griffin Club Recrea!on Center – La Quinta, CA
Trails and Bikeways
Altair Trail and Bikeway System – Temecula, CA
Black Bench Community Trails - Banning, CA*
Bridlewood Community Trail - Riverside, CA*
Buffalo River Trail – Buffalo, NY**
Erie County Riverwalk Class I Regional Bikeway – Buffalo and Tonawanda, NY**
Estates at StoneBridge Trails Planning - San Diego, CA* Long Valley Wash Trail – Temecula, CA
Mission Trails Regional Park – West Sycamore Region*
Mockingbird Ridge Equestrian Trail - Riverside, CA*
Morgan Hill Equestrian Trail – Riverside, CA*
Niagara Riverwalk Trail - Niagara Falls, NY**
Orchard Run Trail System – Valley Center, CA
Pacific Highlands Ranch Trailhead – San Diego, CA
Park Circle Trail System – Valley Center, CA
Sacred Rocks Reserve – Boulevard, CA
Salt Creek Class I Regional Bikeway – Riverside, CA*
San Diego River Founda!on – Pocket Park/ Trail Head –
San Diego, CA
Santa Ana River Trail – Riverside, CA
Serrano Creek Restora!on and Trail – Orange Co., CA
Sommers Bend Trail System – Temecula, CA
* project completed by Tim Jachlewski while Principal/ project manager of Van Dyke Landscape Architects, Inc. ** project completed by Tim Jachlewski while project manager at Parsons Transporta on Group of N.Y., Inc.
PARKS/RECREATION/TRAILS COMPREHENSIVE LIST OF PROJECTS
Tim Jachlewski - con'nued KEY PERSONNEL
1073
STATEMENT OF QUALIFICATIONS
RON MORENO
Project Manager
REGISTRATION
California Landscape Architect licensure
(in process)
EDUCATION
B.S. (Bachelor of Science in Landscape
Architecture)
Cal Poly, Pomona, 2013
EXPERTISE
• Project Management
• Site Design
• Water conserva!on prac!ces
• Irriga!on design and project
management of complex, largescale projects
• Irriga!on Water Use Master Plans
• Irriga!on Demand analysis
• Recycled water use irriga!on plans
and processing
EXPERIENCE
12 years of landscape architectural professional prac!ce experience
2017-Present: Project Manager and Director of Irriga!on Design In-Site Landscape Architecture, Inc.
2013-2017: Project Manager/ Irriga!on Designer - Summers Murphy & Partners, Dana Point, CA
2013: Landscape Consultant
Ron is a bilingual self-starter with a background in landscape architecture and irriga!on design. He has been involved in projects in California, Nevada, Arizona, Washington, Oregon, and Texas. He is responsible for project management, site design, irriga!on water use master plans, irriga!on construc!on documents, water use calcula!ons, and construc!on support servces. Ron is able to manage a landscape project from any phase providing the best solu!ons based on water use efficiency, cost effec!veness, latest products, and project value. Relevant Projects:
Palma Village Park - Palm Desert, CA Responsible for the schema!c plan, construc!on documents, and construc!on support services for this City of Palm Desert park improvement project.
Fritz Burns Park Master Plan – La Quinta, CA Responsible for the park master plan and public outreach presenta!ons and support for this 7- acre, $8-million park master plan project.
Sports Ranch and Sommers Bend – Temecula, CA Responsible for the irriga!on design, construc!on document support, and construc!on administra!on for this 19.7-acre, $11.8-million City of Temecula public park located in the Sommers Bend community. Responsible for irriga!on design, construc!on document support, and construc!on administra!on for almost 40 projects including:
• Long Valley Wash Habitat Crea!on and Mi!ga!on (16 acres) • Park and Ride / Trailhead (50 cars and 6 horse trailers) • Equestrian and mul!-use trails (9.75 total miles)
• Calle Girasol/ Nicolas Rd Habitat Mi!ga!on (4.27-acres) • Private Park/ greenbelt including off-leash dog run, warrior fitness course, and parks
• Na!ve Slope Restora!on and Water Quality Basins
• Street Improvement Landscape Plans
Harvest Park and Park Circle – Valley Center, CA Responsible for the irriga!on construc!on documents and construc!on administra!on for this County of San Diego public park located in the Park Circle master planned community. Also responsible for the irriga!on master plan, CD’s and CA for Three Private Recrea!on Complexes, Four Private Linear Parks, Trails and Pathways, streetscape improvements, Community Garden, Moosa Creek Na!ve Riparian Enhancements, and Dog Play Areas.
Winchester Sports Park - Riverside, CA Responsible for the co-project management, construc!on documents, for this 32-acre $28.3-million, County of Riverside public park.
KEY PERSONNEL
1074
STATEMENT OF QUALIFICATIONS
ALEX KOUTZOUKIS
Landscape Architect, PLA
REGISTRATION
Licensed Landscape Architect,
California (#6327)
EDUCATION
Bachelor of Science:
Landscape Architecture, Minor Landscape
Restora!on
University of California, Davis, 2012
EXPERTISE
• Project Management
• Site Design
• Technical skills
• Construc!on detailing
• 3D Visualiza!on expert
• Plant material selec!on
• Na!ve plan!ng design
EXPERIENCE
12 years of landscape architectural professional prac!ce experience
2020-Present: Landscape Architect/ Project Manager
In-Site Landscape Architecture, Inc.
2014-2020: Project Manager/ Designer -
MJS Landscape Architecture, Newport Beach, CA
2013-2014: Landscape Designer
Molly Wood Garden Design, Costa Mesa, CA
2008-2012 Landscape Staff,
Back to Na!ves Restora!on, Irvine, CA
2010-2011 Hedgerow Farms, Winters, CA
Alex has extensive project management experience with landscape architecture projects. Alex collaborates well with civil engineers, architects, and other consultants to crea!vely solve design problems. He is responsible for management of projects from design through construc!on and communicates with clients and stakeholders to ensure a quality product within budget. He has experience working on a range of project types and scales including en!tlements, parks, recrea!on, trails, master planned communi!es, mul!-family residen!al, and commercial projects.
Relevant Projects include:
Fritz Burns Park Master Plan - La Quinta, CA
Responsible for assistance with the park master plan, public outreach, 3D renderings, 3D anima!ons, opinion of probable construc!on cost es!mate, and CD’s for this 6-acre, $8-million park renova!on project.
The plan includes the conversion of two tennis courts into 8 pickleball courts, water playground/ pool expansion, restrooms, picnic areas, shaded gathering plaza, playground expansion and enhancements, shaded promenade with sea!ng, public art, lawn areas, shade structures, parking lot reconfigura!on, EV chargers, and addi!onal parking.
Sommers Bend - Temecula, CA
Responsible for private park/ greenbelt including playground, shade shelter, warrior fitness course, dog park, as well as trail overlooks, na!ve plant restora!on, storm water quality basis and luxury model homes.
Wayfare Sta'on Park - Santa Clarita, CA
Responsible for private park and greenbelt including playground, shade shelters, picnic areas, bandshell/stage, sea!ng areas, and open lawn recrea!onal areas.
Other Relevant Projects include:
• City of San Marcos As Needed Consul!ng - San Marcos, CA • Southern California Edison Projects - various campuses • Eclipse Recrea!on Center - Escondido, CA
• Mesa College Drive Mixed Use - San Diego, CA
• BDM Mixed Use Recrea!on Areas - San Diego, CA
KEY PERSONNEL
1075
STATEMENT OF QUALIFICATIONS
SHANE PRESTON
Project Designer
EXPERTISE
• Extensive plan!ng design
knowledge of Southern California
plants
• Construc!on Documents
• Construc!on Details
• 2D and 3D Landscape Architectural
Rendering Expert
• Graphic Arts
• Master Planning
EXPERIENCE
39 years of landscape architectural design experience
2024-Present: In-Site Landscape Architecture, Inc.
Project Manager/ Designer
2005-2024: David Neault Associates, Inc.
Director of Design / Project Manager
1996-2005: Teshima Design Group
Project Manager / Designer
1995-1996 Nowell + Associates
Project Manager / Designer
1988-1995 Western Land Concepts
Dra`sman / Designer
1986-1988 Wimmer Yamada Landscape Architecture, Inc.
Dra`sman / Designer
Project types include park and recrea!on projects, waterparks, commercial high-rise projects, educa!onal projects, medical facili!es, civic projects, veteran memorials, wineries, resorts, hotels, auto-dealerships, community master-planning, demonstra!on gardens, private residen!al, mixed-use projects, trails and bikeways, churches, and HOA common areas.
Projects include:
Los Alamos Hills II Sports Park – Murrieta, CA *
This park project commissioned by The City of Murrieta is an approximately 46-acre addi!on to the adjoining sports park and includes equestrian trails, equestrian staging areas, aqua!c complex, gymnasium, (2) full -court basketball courts, (3) tot lots for varied age groups, shaded picnic area, fenced dog parks for large and small breeds, (9) tennis courts, (1) tournament court with bleachers, pro shop and snack bar, ping pong pa- !o, frisbee golf course, sand volleyball courts, extensive jogging loop paths, community services/opera!ons complex building, riparian conserva!on area, BMX/skate park, passive park areas and large open turf areas.
Coast View Community Park – San Diego, CA *
An approximately 7-acre mul!-use park with scenic views of the coast.
Park ameni!es include loop path with par course equipment and benches, large, shaded tot lot area, grills and picnic sea!ng, scenic overlook gazebo and large turf area.
Remington Place Park – Menifee, CA *
Ameni!es include: a large open-play turf area, a well-shaded loop path, par course exercise area, shaded picnic and grill areas, a large, shaded tot lot with areas for varied ages and disabili!es with rubberized surface, restroom building, pickleball courts and cornhole courts.
Lago Vista Sports Park - Menifee, CA *
A 29-acre sports park with (1) full soccer field, (3) ball fields, tot lot with equipment for 2-5 year and 5-12 year ages, (2) shaded picnic areas, restroom buildings. • Classics Park at College Park - Chino, CA *
• Symphony Park at College Park - Chino, CA *
• Harvest Park at College Park - Chino, CA *
• Margarita Community Park - Temecula, CA *
• Rosena Ranch Passive Park - Lytle Creek, CA *
KEY PERSONNEL
* Project completed by Shane Preston while
Project Manager / Designer at David Neault
Associates Landscape Architecture, Inc.
1076
STATEMENT OF QUALIFICATIONS
PATRICK O’CONNOR
Senior Landscape Architect, PLA
REGISTRATION
Licensed Landscape Architect,
California (#1877)
EDUCATION
B.L.A. (Bachelor of Landscape Architecture)
University of Oregon, 1977
M.L.A.U.D. (Masters of Landscape
Architecture in Urban Design and
Planning), Harvard University, 1983
EXPERTISE
• Public Works projects
• Site construc!on design
• Plant material selec!on
• Streetscape/civic facility design
• Community par!cipa!on
• Urban design studies focusing on
development implementa!on
strategies
• Design legisla!on/guidelines for
public and private facili!es.
EXPERIENCE
47 years of landscape architectural professional prac!ce experience
2017 – Present Project Manager, In-Site Landscape Architecture, Inc. 1994 – Present Parterre, Landscape Architects and Planners 1987 – 1994 Aus!n Hansen Group, Architects/ Planners/
Engineers; San Diego
1984 – 1987 M. W. Steel Group, Architects/ Planners; San Diego 1983 – 1984 Philips, Brandt, Reddick (PBR), Urban Planners/ Landscape Architects; Irvine
1979 – 1981 Kawasaki, Theilacker and Associates, Landscape Architects; San Diego
1977 – 1979 Wimmer, Yamada, Landscape Architects; San Diego Pat’s professional and academic interests for the past forty years have centered on the planning and design of urban open space projects. The majority of projects he is responsible for direc!ng requires coordina!on of mul!ple design disciplines such as architecture, engineering and planning. Pat is par!cularly knowledgeable in developing design solu!ons where consensus building with private development interests and ci!zen community groups is a fundamental part of the study process. Exploring methods to fully vest private and public interests in the design process has always been a special interest of Pat’s.
Pat also specializes in the design of pedestrian thoroughfares where issues of ADA, Title 24 and traffic calming are prominent. Pat has worked throughout San Diego County on public and private open space designs incorpora!ng new sidewalks, ligh!ng, furniture, signage, accessibility upgrades, public art, special features and landscaping. Pat extensively researches design methods, product reliability and regulatory standards prior to finalizing construc!on plans.
Pat has been a lecturer by appointment in the Urban Studies and Planning Program at the University of California at San Diego (UCSD). He lectures on the subject of public policy, design and resultant form consequences.
KEY PERSONNEL
1077
CIVIL ENGINEERING DEPARTMENT MANAGER
William A. Pope
Mr. Pope works in Michael Baker's Palm Desert Office.
He has resided in the Coachella Valley all of his life and has seen the many changes that have shaped the
landscape of this beautiful valley. He is experienced
with Autocad Land Development Desktop software
including Civil and Survey modules, Autocad Civil 3D,
along with various data-base packages for
hydrology/hydraulics and map checking protocols. Mr.
Pope has extensive knowledge in the writing of legal
descriptions, area calculations and mapping which
includes Parcel Maps, Tract Maps and Lot Line
Adjustments. He works closely with Michael Baker's Public Works personnel in providing necessary base mapping, right-of-way analysis and property research through various parcel information programs and close contact with various title companies locally. With 20 years of experience in the consulting engineering industry, Mr. Pope has developed unique skills in the preparation of parcel, tract and ALTA/ACSM plats along with civil design plans including sewer, water, storm sewer, hydrology calculations, and street plan and profile design.
RELEVANT EXPERIENCE
Rancho Las Flores Park Master Plan - Phase 1, Coachella, California. City of Coachella. Project Manager. Responsible for mapping services. Michael Baker provided professional landscape architecture and civil engineering services to the City of Coachella for the design and development of a community sports park. The 25-acre park included a major lighted soccer complex, football field, baseball and softball fields, playgrounds, picnic areas, splash fountain, restrooms, shade structures, a new public street, parking lot improvements, landscaping, irrigation, and associated improvements. Services included the preparation of conceptual design alternatives, a two phased master plan, and final plans, specifications and estimates.
Marriott Shadow Ridge Resort, Palm Desert, California. Marriott Ownership Resorts. Project Manager. Responsible for mapping services.
Michael Baker provided surveying and mapping services for Phase 9 of the Marriott Desert Springs Villas North Development, which will include the ultimate build-out of 999 attached vacation residential time-share dwelling units (villas), an 18-hole golf course, sales center, and restaurant.
The villas are grouped in 51 buildings with approximately 20 villas per building. Michael Baker assisted with various parcel map waivers through the City of Palm Desert for re-configuring the previously mapped lots along with vacation of several emergency vehicle access easements.
Michael Baker also prepared a record of survey and various legal descriptions and plat maps for future food truck lot access.
Tennis Gardens at Indian Wells, Indian Wells, California. Pm Sports Management. Project Manager. Responsible for the on-site grading design and on-site utility infrastructure for the Garden of Champions tennis complex expansion project. Michael Baker provided engineering services for the Garden of Champions expansion project; a tennis complex constructed on the remaining 30-acre vacant site adjacent to the existing tennis complex. The complex is home to the BNP Paribas Open Tennis Tournament. As part of the proposed design, it was necessary to relocate a domestic sewer and water main, quitclaim existing easements back to the landowner, and prepare new easements for the Coachella Valley Water District main lines that were relocated. Project work includes bid evaluation and construction management services.
The project includes a new 16,000-seat main stadium, four other new tennis courts, two new parking lots, and turf parking areas. Engineering also included off-site street improvement plans, signing and striping plans, modifications to the traffic signal at the intersection of Miles Avenue and Washington Street, private sewer, water and fire water improvement plans, hydrology and hydraulics reports, water quality management plans, detailed site ADA access plans for proper circulation and CBC requirements, coordination with several consultants including audio/video specialists, restaurant design teams and working closely with Imperial Irrigation District and Southern California Edison for the coordination and expansion to the electrical infrastructure on-site. The project design and construction was given a very aggressive schedule and the expansion was done within 10 months and 10 days from project design to Certificate of Occupancy.
Terra Lago Four Seasons Project, Indio, California. K. Hovnanian Companies of California. Project Manager. Responsible for mapping services as well as a full-service suite of Civil Engineering Design. Michael Baker provided and is currently preparing final engineering and mapping services for the Terra Lago Four Seasons project consisting of an ultimate build-out of 827 residential, single-family lots. Terra Lago is being built over several phases with the first phases including seven separate final maps that were prepared and recorded within the City of Indio. Michael Baker was responsible for attending project meetings and preparing final tract maps, ALTA surveys, and various plats and legal descriptions to assist the developer with the Bureau of Real Estate (BRE) and Department of Real Estate (DRE). Civil engineering design included both on and off site street improvement plans, storm drain, sewer and water improvement plans, WQMP, SWPPP reporting, rough and precise grading improvement plans as well as coordination with subconsultants and various contractors during the construction phase of the development which is still under construction.
The Thermal Club Project, Thermal, California. Thermal Operating Company, LLC. Project Manager. Responsible for mapping services.
Michael Baker is currently providing construction surveying services for The Thermal Club, a premier private motorsports facility. In addition to
4.5 miles of members-only racetrack, the Club facilities will include over 200 Founders Lots, a Clubhouse and Village unrivaled in the motorsports world, and will rank among the best of private clubs of any type. The project encompasses 530 acres in Riverside County.
Years with Michael Baker
13 Years of Experience
32 Education
Vocational/Technical, 2005, Surveying and Mapping
Course, Mount San Jacinto Community College,
College of the Desert
Professional Affiliations
Project Management Institute (PMI)
Building Industry Association of Southern California
(BIA)
1078
CIVIL ENGINEERING DEPARMENT MANAGER – PUBLIC WORKS
Lonnie Druliner, P.E.
Ms. Druliner has many years of experience in land
development in both private and public sectors
throughout southern California. Her project experience
ranging from residential, multi-family, and commercial
development to Capital Improvement Projects (CIP).
Her experience has developed her skills in grading and
improvement plans, storm water calculations, hydrology analyses, utility designs, and SWPPP reporting. She is currently pursuing her ADA CASp Certification.
RELEVANT EXPERIENCE
Button Parking Lot Project. City of Rancho Mirage. Overseeing civil, landscape architecture, and electrical disciplines to design and grade roughly 2.3 acres of parking lots to be used for the Rancho Mirage Amphitheater and weekly farmers markets. Street improvement and ramps are being updated to comply with ADA requirements. Coordinating with the City to develop material needed for City Council, including 3D renderings.
Morrison Park Pump Track & Site Improvements Project. City of Moreno Valley. Oversee the expansion design of Morrison Park which includes the addition of a parking lot, restroom, pump track, lighting, detention basin, flow track, bicycle playground, and trail path. Managed multiple engineering disciplines, including electrical, stormwater, civil, geotechnical, and landscape architecture, in collaboration with the pump track team, to deliver the plans, specifications, and estimate package to the City in a timely manner.
Capital Improvement Projects (CIP). City of Escondido. Includes Active Transportation Projects (ATP) throughout the City to improve sidewalk curb and gutter, adding bicycle lanes, implementing traffic calming measures, and promote safe routes to school. Various phases of the projects were environmental (CEQA and NEPA), engineering and specifications, and construction. Grants ranged from $1.2M to
1.6M. Reporting and submittals were coordinated with Caltrans, SANDAG, and California Transportation Commission (CTC). The ATP Cycle 6 application was recently submitted in June of 2022.
Grape Day Park Improvements Project. City of Escondido. Focused relocating a restroom within Grape Day Park and providing ADA access to the restrooms from the various access points of the park. Coordination efforts were made with utility companies, Escondido Police Department, Escondido Parks and Recreation Department, Escondido’s Historic Preservation Committee, California Center for the Arts - Escondido, and design consultants to provide the best service to all parties and especially the residents.
Years with Michael Baker
2 Years of Experience
12 Education
M. Eng., 2012 Civil Engineering, Tufts University
B.S., 2010, Structural Engineering, University of
California, San Diego
1079
SENIOR PROJECT MANAGER – ENVIRONMENTAL & PUBLIC ENGAGEMENT Elizabeth Meyerhoff
Elizabeth Meyerhoff brings 20 years of experience as an community planner with extensive working knowledge of
California’s complex environmental regulations. Public
outreach and community engaggemnt efforts include
delivering project-specific scoping, hosting open houses, and project presentations to various committees, including engagement in direct dialog with the public and key stakeholders.
EXPERIENCE
Lake Gregory Regional Park Project. San Bernardino County Public Works. Environmental Lead. Ms. Meyerhoff was responsible for the preparation of the CEQA compliance report and supporting technical studies. The project includes construction of infrastructure improvements and routine maintenance elements for ongoing operations at the regional park. Key topics included recreation, water quality, and public safety.
Broadband Strategic Master Plan. City of San Bernardino. Community Engagement. Elizabeth led several public outreach meetings throughout the City to share project information and receive community feedback. The project explored the feasibility of a municipal broadband network ownership through a comprehensive analysis that included:
identifying and analyzing existing infrastructure (both above and below ground); analyzing infrastructure vulnerabilities and strengths; identifying and analyzing shared resources and shared infrastructure across City departments; and gathering quantitative and qualitative data from city residents and community leaders on internet access and use barriers.
Coachella Rail Station Feasibility Study. City of Coachella. Community Engagement and Environmental Lead.
Elizabeth is providing environmental due diligence including demographic research and resource evaluation for several potential sites for a multi-modal rail and transit station. The study engages community members in the City and the greater Coachella Valley region to optimize the benefits of rail service in Coachella Valley with the goals of reducing vehicle trips and greenhouse gas emissions with particular attention given to incorporating the feedback of disadvantaged and historically underserved community members and stakeholders of these region.
Western Coachella Valley Flood and Blowsand Road Improvement Project, Indian Canyon Drive CEQA/NEPA Compliance and Regulatory Permitting. Coachella Valley Association of Governments. Environmental Lead. Michael Baker is providing design and planning services for the 1.8-mile roadway segment to mitigate floodwater and blowsand impacts and improve the existing 4-lane divided major thoroughfare per the City of Palm Springs General Plan. Ms.
Meyerhoff is responsible for environmental compliance, overseeing the preparation of scientific/technical reports, and regulatory permitting as well as coordination with key stakeholders.
Frank Sinatra Drive Low Flow Water Crossing Feasibility Study. City of Rancho Mirage. Environmental Lead. Ms.
Meyerhoff led the environmental team in the development and analysis of several designs considerations and location alternatives to allow for increased recreational connectivity and improved vehicle safety along the low flow water crossing.
Identified environmental opportunities and constraints for each alternative including maintenance activities. Key planning and environmental issues included multi-agency coordination and consultation, aesthetics, biological mapping and clearing, tribal coordination, floodway management, and jurisdictional permitting.
Years with Michael Baker
3 Years of Experience
20 Education
Post-Baccalaureate Professional Certificate,
Land Use and Environmental Planning,
University of California, Riverside Extension
B.A., Sociology, University of California, Riverside
Professional Affiliations
Desert Valley Builders Association, Professional
Women in Building Council Member, 2024-Present
Association of Environmental Professionals, Past
Elected Board Member 2018-2024
American Planning Association, Member
1080
CIVIL ENGINEERING PROJECT MANAGER
Francisco Alcocer
Mr. Alcocer has extensive experienced in
land development and client relations. His
experience includes projects within the
commercial, residential, and institutional
sectors. As project manager his
responsibilities include design and
production of grading, sewer, water, and
street & storm drain plans. His software skill and experience include an advanced understanding level of AutoCAD Civil 3D.
RELEVANT EXPERIENCE
Terra Lago Four Seasons Project, Indio, California. K. Hovnanian Companies of California. Project Manager. Responsible for managing the project by coordinating staff, client needs, budgeting, and scheduling. Also overseeing final engineering tasks such as utility, grading, site, demolition, and a horizontal control plan. The Terra Lago Four Seasons project consisting of an ultimate build-out of 827 residential, single-family lots. Terra Lago is being built over several phases with seven separate final maps that will be recorded within the City of Indio.
Mountain View Estates Project, Cathedral City, California. Desert Housing Venture. Project Manager. Responsible for managing the project by coordinating staff, client needs, budgeting, and scheduling. Also overseeing final engineering tasks such as utility, grading, site, demolition, and a horizontal control plan. The Mountain View Estates project consisting of an ultimate build-out of 110 residential, single-family lots.
Mountain View Estates is being built in two phases including two separate final maps that will be prepared and recorded within the City of Cathedral City.
The Thermal Club, Thermal, California. Project Manager. Responsible for managing the project by coordinating staff, client needs, budgeting, and scheduling. Also overseeing final engineering tasks such as utility, grading, site, demolition, and a horizontal control plan. The Thermal Club project consisting of an ultimate build-out of over two hundred residential units.
Civic Center Park, City of Palm Desert, California. Project Manager. Francisco serves as the project manager for the Civic Center Park hardscape upgrades currently being designed for the City of Palm Desert. The project will include removal and replacement of the existing concrete flatwork adjacent to the existing playground equipment and restroom building. His responsibilities include managing staff tasked to prepare the improvement plans, scheduling with the client and assisting with site design as needed for project completion.
Eisenhower Central Plant Expansion, Rancho Mirage, California. Project Manager. Responsible for managing the project by coordinating staff, client needs, budgeting, and scheduling. Also overseeing final engineering tasks such as utility, grading, site, demolition, and a horizontal control plan. The Cardiovascular Building Expansion consist of two multi story buildings with various ADA paths of travel.
Floor and Decor Project, La Quinta, California. Civil Associate. Assisted with design and plan production for a composite utility, and precise grading plan using Civil 3D. The plans included extensive demolition work which was addressed through the conceptual design phase of development. A thorough set of site demolition plans, a new loading dock and coordination with several of the existing underground utilities was performed. The existing building formerly housed a Sam’s Club Home Improvement Center and all site improvements needed to be brought back up to current California Building Codes with the City of La Quinta Building and Safety and Engineering Departments. The project was completed on time and under budget with a very aggressive schedule proposed by the client.
Years with Michael Baker
11 Years of Experience
11 Education
B.S., 2012, Civil Engineer, California State
Polytechnic University, Pomona
Licenses/Certifications
Professional Affiliations
Institute of Transportation Engineers (ITE)
Years with Michael Baker
12 Years of Experience
12 Education
B.S., 2012 Civil Engineer, California State
Polytechnic University, Pomona
Professional Affiliations
Institute of Transportation Engineers (ITE)
Building Industry Association of Southern California
(BIA)
1081
SENIOR CIVIL DESIGNER/ ASSISTANT PROJECT MANAGER
Samuel Menache Diaz de Leon
Mr. Menache Diaz de Leon is experienced in the civil
engineering field and specializes in street, grading,
drainage, water, and sewer design. His project
experience includes numerous private development and
public infrastructure projects ranging from one-acre
commercial sites to large master planned residential communities.
Responsibilities of these projects include preparation of preliminary designs for planning, utility conflict studies, grading and drainage plans, water, sewer, storm drain improvement plans, construction documents, cost estimates and project coordination.
RELEVANT EXPERIENCE
Veterans Memorial Park, Coachella, California. City of Coachella. Provided landscape architecture and civil engineering for the initial conceptual plan alternatives, renderings, and preliminary cost estimates for the redesign of the downtown Veterans Park. The park includes a Veterans monument with an infinity edge fountain at its center, memorial wall, performance and event stage with turfed amphitheater, public restroom, covered group picnic area, formal arched entry and palm grove, desert botanical garden and courtyard entry to City Hall, gated parking area, on street parking, new parking lot, widened sidewalks to accommodate community events, site furnishings, and street trees.
Responsible for completed design development and final plans, specifications, and estimate (PS&E) for bidding and construction and provided support during construction.
Sundance, PA 45 & 51, Tract 31469-3 & Tract 31470-1 Park Sites, Beaumont, California. Pardee Homes. Provided precise grading and paving design for two park sites (3.5 ac and 1.5 ac) within the residential community of Sundance located in the city of Beaumont, CA. Parks included fitness center, recreation areas, playgrounds, pool, spa and restrooms. Responsible for the preparation, design and processing of improvement plans, utility plans, precise grading plans, construction documents, cost estimates, and providing public agency and subconsultant project coordination..
Tournament Hills, Tract 36307-1, Park Site, Beaumont CA. Tri-Pointe Homes. Provided precise grading and paving design for a 3-acre park site located within the residential community of Tournament Hills in the city of Beaumont, CA. Pak site included pool, spa, recreation area, playground and restrooms. Responsible for the preparation, design and processing of improvement plans, utility plans, precise grading plans, construction documents, cost estimates, and providing public agency and subconsultant project coordination..
Sundance, Active Adult Recreation Center and Paseos, Beaumont, CA. Tri-Pointe Homes. Responsible for the engineering analysis, site plan layout, grading, storm drain, and utilities design of a 7-acre site with a state of the art recreation center that included a fitness center, locker rooms, pool, spa, pickleball courts and dedicated parking. Duties included grading, paving, street, storm drain, water, and sewer design.
Responsible for the preparation of improvement plans and construction documents, and providing public agency and subconsultant project coordination.
Pyramid Ranch Park Site, Tract 38557-1, Coachella, CA. Pulte Homes. One acre park site located within the residential community of Pyramid Ranch in the city of Coachella. Park included a dog park, basketball court and meandering walkways. Responsible for the site layout, engineering analysis, and grading design. Responsibilities included; preparation of precise grading plans, construction exhibits, and providing public agency and sub-consultant project coordination.
Years with Michael Baker
12 Years of Experience
21 Education
B.S., 2001, Industrial Engineering/Civil Engineering,
Colorado State University
1082
CIVIL ENGINEERING QUALITY CONTROL MANAGER
Miguel V. Gonzalez, P.E., LEED AP
Mr. Gonzalez currently serves as a Technical Manager in the Temecula regional office. He is responsible for
overseeing the implementation of Quality Control and
Quality Assurance implementation for preparation of
improvement plans for grading, street design, storm drain, sewer and water plans. Mr. Gonzalez is familiar with Agency requirement in Southern California. He has a diverse background with civil and electrical engineering with emphasis in land development, public works, construction management and storm water. In addition to final engineering, he has reviewed entitlement of new projects and prepared conditions of approval for them.
RELEVANT EXPERIENCE
Spencer's Crossing Sports Park, Riverside County, California. Lennar Homes of California. Project Manager. Responsible for preparing rough grading plans, precise grading plans, and utility design for this 12-acre sports park that was part of the Specific Plan for Spencer’s Crossing.
The project includes one soccer field, two softball fields (one of them is lighted), children's play areas, picnic areas, barbeque areas, walking trails, shade pavilions, open play areas, restroom/concession/storage building, and off-street parking.
Mr. Gonzalez was also responsible for the street improvement, wet utilities and drainage facilities surrounding the park.
Santana Park Expansion, Corona, California. Project Engineer. This project added approximately 1.5 acres to the existing Santana Park site after vacation of one segment of Garretson Avenue per the construction of Magnolia Avenue. Mr. Gonzalez was responsible for precise grading plans and drainage for new walkways, enlargement of one ball field, and additional parking lot.
Centinela Bike Pump Track, Inglewood, California. Velosolutions. Project Engineer. Michael Baker, partnering with Grow Cycle Foundation, provided design and engineering services to develop a bike pump track for the Edwin Vincent Park. The track is an asphalt paved, closed loop track, consisting of undulating rollers, banked turns, and features to enhance the play experience, serving a wide range of age groups and nonmotorized wheeled vehicles (such as bicycles and scooters). The track was inset two feet below grade with a starting platform height of two feet above grade. Mr. Gonzalez was responsible for the preparation of precise grading plans, drainage plans, and the low-impact development BMPs.
Ronald Reagan Bike Pump Track, Temecula, California. City of Temecula. Project Manager. Michael Baker was retained by the City of Temecula to provide design and engineering services to develop a bike pump track for the Ronald Regan Sports Park. The track was set even with the existing grade with a starting platform height of four feet above grade. Mr. Gonzalez was responsible for the preparation of precise grading plans, drainage plans, low-impact development BMPs and Water Quality Management Plan.
Heroes Park, Riverside County, California. Brookfield Homes. Project Manager. Responsible for preparing rough grading plans, precise grading plans, and utility design for this 14-acre park in the French Valley in Riverside County. The project includes one soccer field, two large dog fenced play areas, two picnic areas, walking trails, shade pavilions, open play areas, restroom/concession/storage building, and off-street parking. Mr. Gonzalez was also responsible for the street improvement, wet utilities and drainage facilities surrounding the park.
Glen Arbor Dog Park Project, Murrieta, California. City of Murrieta. Michael Baker is preparing a categorical exemption report for the city of Murrieta's Glen Arbor Dog Park Project. Overall, the Michael Baker team is providing professional engineering design services in preparing survey mapping, site research, environmental documents, stormwater analysis, structural bridge feasibility analysis, precise grading, and estimates. Mr. Gonzalez is the engineer of Record for the project Years with Michael Baker
22 Years of Experience
39 Education
M.S., 1995, Civil Engineering, San Diego State
University
C.A., 1991, Industrial Electricity, San Diego City
College
B.S., 1985, Civil Engineering, University of
Guanajuato, Mexico
Licenses/Certifications
LEED Accredited Professional
Professional Engineer - Civil, California, 2001, 61561
Professional Engineer - Civil, Mexico, 1987, 1129464
Professional Engineer - Civil, B.C. Mexico, 1990,
5030/90
Professional Affiliations
American Rainwater Catchment Systems Association
(ARCSA)
1083
STORMWATER LEAD
Danielle R. Peltier, E.I.T.
Ms. Peltier is a project manager specializing in
hydrology and water quality in the Coachella Valley.
She has led design work for both private and municipal
infrastructure projects across Southern California.
Danielle’s expertise includes performing detailed
hydrologic and hydraulic analyses and preparing final
designs (PS&E). Her software experience spans CivilDesign, HydroCalc, and AES software for hydrologic analysis, Hydraflow Storm Sewers Extension and WSPGW for hydraulic analysis, and HEC-RAS and XPSWMM for 1D/2D modeling. She is also adept at using ArcGIS Pro and AutoCAD Civil3D for plan production and data analysis. Danielle has prepared and plan checked water quality management, stormwater pollution prevention, and erosion control plans. She collaborates with our internal team, agencies, and stakeholders to deliver streamlined, sustainable, and effective solutions.
RELEVANT EXPERIENCE
Glen Arbor Dog Park Project, Murrieta, California. City of Murrieta. Design Engineer. Responsible for stormwater related design and reports for the public park project, including water quality management, hydrology and hydraulics, and stormwater pollution prevention from preliminary to final engineering including coordination with the City. Performed hydrologic analysis, HEC-RAS modeling, hydraulic analysis, and water quality treatment design. This park is in a floodway, and modeling was performed to ensure new facilities would not be damaged due to velocities in the design storm. Michael Baker is preparing a categorical exemption report for the city of Murrieta's Glen Arbor Dog Park Project. Overall, the Michael Baker team is providing professional engineering design services in preparing survey mapping, site research, environmental documents, stormwater analysis, structural bridge feasibility analysis, precise grading, and estimates.
Morrison Park Bike Pump Track, Moreno Valley, California. City of Moreno Valley. Senior Designer. Responsible for leading the stormwater design and reporting for the project, encompassing water quality management, hydrology and hydraulics, and stormwater pollution prevention.
This project had submittals at 30%, 90%, and 100% which required great communication with the City and project team to skip the 60% phase.
Performed hydrologic analysis, hydraulic analysis, and water quality basin design and routing. Michael Baker provided engineering design and environmental services for the pump track and site improvements as part of Morrison Park Expansion Phase 1 Improvements. The project scope includes an asphalt pump track, commercial driveway, parking lot with 40-50 parking spaces, pre-fabricated restroom, site lighting, site furnishings, drainage improvements, and an asphalt trail connecting the new site to the existing Morrison Park Parking Lot.
Amargosa Creek Recreational Trail, Lancaster, California. City of Lancaster, California. Design Engineer. Responsible for the Amargosa Recreational Trail Project Hydrology and Hydraulics Study and drainage design. The two-mile bike trail proposed along Amargosa Creek required an analysis of the project’s hydraulic impact to the existing channel and evaluation of water quality BMPs. Michael Baker has been contracted to prepare concept plans, a preliminary design, and environmental documentation for the Creek Recreational Trail Project in Lancaster, California. The project includes the design and construction of a 2-mile bike and pedestrian trail (Class I facility) along Amargosa Creek from Avenue H to Avenue J Amargosa. The project scope includes alternatives analysis for each of the three trail crossing locations.
Alternatives studies include a bridge overcrossing and at-grade crossing options including HAWK signals or RRFBs with lane reconfiguration and bulb outs. The trail itself will be a shared-use path with a landscaping buffer, which will serve as a water quality treatment device and to enhance the aesthetic of the trail.
On-Call Surveying and Civil Engineering Plan Review Services, Palm Desert, California. City of Palm Desert. Civil Associate. Responsible for providing on-call services to the City of Palm Desert, specifically reviewing Water Quality Management Plans for the Whitewater River Region, Hydrology Reports, and design drawings. The reviews were conducted in a timely but detailed manner and communication with the consultant was encouraged to help expedite the review process. Michael Baker provided on-call surveying and mapping services to include acting city surveyor responsibilities in Palm Desert, California. In 2020, the city expanded these services to engineering review and again in 2021 to include acting city engineer responsibilities. The work included quality control and assurance for internal documents and procedures and review of applicant submitted plans, maps, reports, and documents for compliance to the laws and codes that govern the practice.
Years with Michael Baker
6 Years of Experience
7 Education
B.S., 2020, Environmental Engineering, University of
California, Riverside
Licenses/Certifications
Engineer-In-Training, 2020
Professional Affiliations
American Public Works Association (APWA)
California Stormwater Quality Association (CASQA)
Engineers Without Borders (EWB)
Floodplain Management Association (FMA)
1084
KEN PEREZ SR– Lighting and Electrical President/ Principal-in-Charge Ken has been in the electrical field for more than 40 years with experience in both construction as well as electrical engineering design. For the last 20 years, he has been working on the engineering side of the industry with an emphasis in lighting design. His actual field experience has given him a tremendous edge over his competition in that he knows firsthand HOW an electrical system is installed, which he is then able to more clearly translate this to the design documents. This approach has enabled him to keep costly change orders down to a minimum for his client’s benefit. Ken serves as Vice President of the IES in San Diego. Ken’s experience has caught the attention of many municipal agencies and has been called upon to offer expert advice on lighting ordinances as well as lighting design guide criteria. He also serves as a lighting judge for certain venues and teaches outdoor Lighting Fundamentals for the San Diego chapter of the IESNA.
EDUCATION
• 40 years of field experience as an electrician installing lighting and power systems. • 29 years engineering design experience in the consulting electrical engineering field. • Lighting applications certification (AGI-32) thru “Lighting Analyst Inc”. • Lighting fundamentals thru “Illumination Engineering Society of North America”. • UCSD-1998, HVAC, DDC Controls Certification
• Mesa College-1978, National Electrical Code
• On-going classes in lighting fundamental, applications, Title-24 and UBC, NEC, CEC.
ORGANIZATIONS
• IES-Illumination Engineering Society – Past Vice President for over 5 years CVAG - Coachella Valley Association of GovernmentsCVAG Arts and Music Line – A 10-mile path of travel through the City of La Quinta, Coachella and Indio, that interconnects with the CV Link and takes you into the Polo Fields for the Golden Voice concerts AKA “Coachella” festival. Provided electrical engineering for artistic lighting that brings intrigue, invokes powerful emotions with illumination, utilizing color changing custom light fixtures in collaboration with Circular Dimensions for lighted art treatments.
City of Vista- Paseo Santa Fe Streetscape. Provided lighting design and electrical engineering for a 4-block section of South Santa Fe Dr. providing enhanced public street lighting and electrical elements. Skip Hammann-City of Vista Development Services, Project Manager. (760) 802-5605
City of San Marcos- We have provided many street light design services and park lighting and electrical design services over the course of many years, such as Buelow Park, Hollandia Dairy park, Conner Park, Sunset Park and have also provided assistance with street light design standards and design criteria. Mike Rafael-City of San Marcos Engineering Division. Senior Civil Engineer-Transportation. (760) 744-1050 ext 3274 Parks with In-Site Landscape Architecture, Inc. – We have completed the following projects with In-Site: Fritz Burns Park - La Quinta, CA, Winchester Sports Park – Riverside, CA, Harvest Park (County of San Diego) – Valley Center, CA, Park Circle – Valley Center, CA, Santa Rosa Plateau Visitor Center Project – Murrieta, CA, Sports Ranch at Sommer Bend – Temecula, CA, The Griffin Club Recreation Center – La Quinta, CA Visual Concepts Lighting, Inc.
Ken Jr. Resume
KENNETH M. PEREZ II – Lighting and Electrical Senior Project Manager Kenny Jr, our senior team member, boasts 18 years of expertise in designing and managing diverse projects. His commitment to staying current with sustainable lighting technology is evident in authored ordinances for Rancho Sante Fe Association and Sommers Bend in Temecula, CA. As our Title-24 expert, he remains at the forefront of the outdoor lighting measures, actively engaging with industry trends through the Illumination Engineering Society of North America
EDUCATION
• Lighting applications certification (AGI-32) thru “Lighting Analyst Inc”. • Lighting fundamentals thru “Illumination Engineering Society of North America” • AutoCad Certification thru “Virtual Design & Construction Institute” • Project Management thru “UC San Diego”
• On-going classes in lighting fundamental, applications, Title-24 and UBC, NEC, CEC etcetera. • CALCTP Certified Employer
• 18 years engineering design experience in the consulting electrical engineering field.
ORGANIZATIONS
• IESNA-Illuminating Engineering Society of North America • BIA – San Diego/Southern California
PROJECTS/REFERENCE
CVAG - Coachella Valley Association of GovernmentsCVAG Arts and Music Line – A 10-mile path of travel through the City of La Quinta, Coachella and Indio, that interconnects with the CV Link and provides a safe path of travel into the Polo Fields for the Golden Voice concerts AKA “Coachella” festival. Provided lighting design for artistic lighting that brings intrigue, invokes powerful emotions with illumination, utilizing color changing custom light fixtures in collaboration with Circular Dimensions for lighted art treatments. Randy Bowman – CVAG Assistant Director – Transportation. [email protected] City of IndioOasis Streetscape Enhancement – Provided lighting design and electrical engineering for 5 blocks on Oasis Street between Indio Blvd. and Highway 111, within the city of Indio’s downtown corridor. Project included civil improvements, landscape improvements and lighting improvements. Lighting improvements included street lighting, pedestrian lighting and landscape lighting. Dilesh Sheth – Albert Webb & associates - Senior Vice President. 951-248- 4237
Colrich Communities and Lennar HomesEpoca Master Planned Community – Provided site lighting design and electrical engineering for five (5) residential communities and a master recreation center, including the street lighting for all roadways. Projects included street lighting, pedestrian lighting, landscape lighting, public trail system lighting, monument lighting, way finding signage, electric vehicle charging stations and power to all site amenities. Briar Belair– Colrich Communities – Project Manager. 619-857-4282. & McKenna Lane – Lennar Homes – Project Manager. 619-241-3431 Visual Concepts Lighting, Inc.
1086
Firm
Verdantas Inc.
Office Location
Temecula, CA
Education
BS, Earth Sciences, University of
California, Santa Cruz, CA
Licenses/Certifications
CA – Engineering Geologist -
2769
CA – Professional Geologist -
9653
Years of Experience
11 Years of Industry Experience
3 Years at Verdantas
Brent Adam, PG, CEG
Project Geologist
Verdantas.com
Brent is a self-mo3vated and detail-oriented geologist with a broad skillset that has been successfully applied to geotechnical, geophysical, forensic, and construc3on materials tes3ng projects. Areas of exper3se include geotechnical and geophysical field methods, geologic mapping and surveying, project management, proposal and report compila3on, client communica3on and business development.
Project Experience
Community Recreation Center Renovation
Temecula, CA
Project Geologist for geologic investigation for the proposed improvements at the Temecula CRC, which included building additions, new landscaping, a splash pad and associated improvements. Also provided construction observation and materials testing services.
Palma Village Park Renovations
Palm Desert, CA
Project Geologist for geologic investigation for the proposed improvements at Palma Village Park, which included a new gazebo and associated improvements.
Temecula Rainbow Rockfall Hazard
Temecula, CA
Project Geologist. Provided geologic mapping, observation, and hazard mitigation recommendations for emergency repair efforts following a significant rockfall event along Rainbow Valley Road in the city of Temecula.
Riverside Gateway Project Suite
Riverside, CA
Project Geologist. Provided geotechnical investigation, geologic reconnaissance, and geohazard review, including mitigation recommendations for preliminary design of proposed improvements at nine park sites along the Santa Ana River Trail within the city of Riverside. 1087
Firm
Verdantas Inc.
Office Location
Temecula, CA
Education
BS, Mathemacs, University at
Albany
Licenses/Certifications
CA – Civil Engineer - #93187
CFR 1910.120 OSHA 40-Hour
Training
CFR 1910.120 OSHA 8-Hour
Refresher Training
CPN Nuclear Gauge Certification
Confined Space Entry Training
Years of Experience
19 Years of Industry Experience
16 Years at Verdantas
Bashir Saiid, PE
Associate Engineer/Group Leader
Verdantas.com
Bashir has more than 18 years of performing construction soils and materials testing as well as geotechnical exploration project coordination. He serves as key personnel providing project management support, including site and subcontractor coordination, geotechnical analysis, lab test results evaluation, and report preparation. His development and growth from a field technician to a associate engineer allows him to understand the full project life cycle and support Verdantas’ turnkey geotechnical and materials services.
Project Experience
Del Webb at Rancho Mirage Active Adult Community
Rancho Mirage, CA.
Project Engineer during the geotechnical investigations to support design options and City of Rancho Mirage requirements. The geotechnical studies comprised of drilled test borings and test pits to further refine soil conditions and related grading recommendations for both onsite and offsite improvements. The 484-acre site will be home to a 1,200+ unit active adult community inclusive of a community park and pedestrian trail and bridge.
Palma Village Park Renovations
Palm Desert, CA
Project Geologist for geologic investigation for the proposed improvements at Palma Village Park, which included a new gazebo and associated improvements.
Roripaugh Community Sports Park,
Temecula, CA.
Project Engineer for the geotechnical exploration for the design and construction of a new community sports park. Conducted senior quality review of the geological aspect of the geotechnical report. The 22-acre park boasts two baseball fields, two soccer fields, two basketball courts, a new playground with swings multiple pavilion shelters with picnic tables, benches, and BBQs.
1088
STATEMENT OF QUALIFICATIONS
KoserConsulting
DRY UTILITY PLANNING & DESIGN
Koser Consulting was founded in January of 2008 in an effort to assist home builders, land developers, and municipalities in the area of dry utility consulting and design. Dealing with such entities as Southern California Edison, Verizon, AT&T, City of Moreno Valley (ENCO), Imperial Irrigation District (IID), City of Azusa Light and Power, The Gas Company, Time Warner Cable, and Charter Communications, Koser Consulting offers outstanding knowledge about and quality rapport with the utility companies and their representatives.
Koser Consulting is staffed with quality, experienced personnel capable of handling all dry utility consulting as well as design needs including electric and telephone applicant design, conflict exhibits, sleeving plans, lot disclosures and bid and quantity reports. In addition, Koser Consulting offers free site evaluations and opinions of cost.
John Koser has over 24 years of dry utility consulting experience as well as two years as a telecom engineer/planner. Having experienced both sides of the field as a utility planner and a consultant, John Koser brings an intimate level of understanding to the consulting business. His thorough knowledge of utility tariffs and utility procedures has proven to be very cost effective to clients budgets.
Lissy Koser has over 21 years utility experience, four of those years in dry utility consulting, and five years in telecom engineering and Right of Way. Lissy also has the advantage of working in utility planning as well as consulting. Her knowledge of Right of Way Administration at AT&T allows for added expertise when reviewing easements for clients.
Consulting projects in which John Koser has been
involved to date include Winchester Sports Park,
city and developer road improvement projects,
CalTrans improvements, commercial and industrial sites, master planned communities and single and multi-family residential projects. These projects were located in a variety of areas including San Diego, Riverside, San Bernardino and Los Angeles Counties.
Koser Consulting prides itself in its personalized
attention and communication and timely responses to the client’s needs. Koser Consulting recognizes the importance of timelines and schedules.
Koser Consulting is cost effective, minimizing costly overhead and passing the savings directly onto the client. Add the utility expertise, the personal
service, attention to details and schedules, as well
as the savings, Koser Consulting is the only choice
for dry utility consulting and design needs.
Winchester Sports Park - Riverside, CA
(Completed with In-Site Landscape Architecture, Inc.)
1089
1090
City of Palm Desert
PW - Operations & Maintenance
Randy Chavez, Deputy Director
73-510 Fred Waring Drive, Palm Desert, CA 92260
[INTERWEST CONSULTING GROUP, INC.] RESPONSE DOCUMENT REPORT RFP No. 2024-RFP-156
Park and Trailhead Engineering and Design
RESPONSE DEADLINE: March 18, 2025 at 5:00 pm
Report Generated: Wednesday, March 19, 2025
Interwest Consulting Group, Inc. Response
CONTACT INFORMATION
Company:
Interwest Consulting Group, Inc.
Email:
[email protected]
Contact:
Jessica Koehler
Address:
1 Jenner, Suite 160
Irvine, CA 92618
Phone:
(954) 766-2707
Website:
http://www.interwestgrp.com
Submission Date:
Mar 18, 2025 2:42 PM (Pacific Time)
1091
[INTERWEST CONSULTING GROUP, INC.] RESPONSE DOCUMENT REPORT RFP No. 2024-RFP-156
Park and Trailhead Engineering and Design
[INTERWEST CONSULTING GROUP, INC.] RESPONSE DOCUMENT REPORT Request For Proposal - Park and Trailhead Engineering and Design
ADDENDA CONFIRMATION
Addendum #1
Confirmed Mar 18, 2025 11:36 AM by Jessica Koehler
Addendum #2
Confirmed Mar 18, 2025 11:38 AM by Jessica Koehler
QUESTIONNAIRE
1. Proposal (WITHOUT COST)*
Proposals shall be concise, well organized and demonstrate qualifications and applicable experience. Proposals shall be organized and include page numbers for all pages in the proposal. The proposal shall be uploaded here, in the following order and shall include:
A. Cover Letter
1. This letter should briefly introduce the firm, summarize the firm’s general qualifications, include an executive summary of the specific approach which will be used to deliver the work scope; and identify the individual(s) name, address and phone number authorized to negotiate Agreement terms and compensation.
B. Experience and Technical Competence
1. Background: Provide history of the firm’s consulting experience which specifically addresses the individual or firm’s experience with similar Service as described in this RFP.
2. References: The proposal shall include a list of recently completed projects that are similar in scope and function to this RFP. Provide a description of the project, client name, and the name, title, and telephone number of the primary contact person.
C. Firm Staffing and Key Personnel
1092
[INTERWEST CONSULTING GROUP, INC.] RESPONSE DOCUMENT REPORT RFP No. 2024-RFP-156
Park and Trailhead Engineering and Design
[INTERWEST CONSULTING GROUP, INC.] RESPONSE DOCUMENT REPORT Request For Proposal - Park and Trailhead Engineering and Design
1. Staffing: Provide the number of staff to be assigned to perform the Services and the names/discipline/job title of each as well as your firm’s capacity to provide additional personnel as needed.
2. Key Personnel: Identify key persons that will be principally responsible for working with the City. Indicate the role and responsibility of each individual.
3. Team Organization: Describe proposed team organization, including identification and responsibilities of key personnel.
4. Subcontractors: The Proposer shall identify functions that are likely to be subcontracted and identify the subcontractor that is anticipated to perform each function.
D. Proposed Method to Accomplish the Work
1. Describe the technical and management approach to providing the Services to the City. Proposer should take into account the scope of the Services, and general functions required. Include a draft first year schedule of tasks, milestones, and deliverables that will provide for timely provision of the Services. In reviewing the scope of Services and goals described herein, the Proposer may identify additional necessary tasks and is invited to bring these to the City’s attention within the discussion of its proposed method to accomplish the work. 25_City_of_Palm_Desert_-_Park_and_Trailhead_Engineering_and_Design.pdf
2. Fee Proposal*
Please provide a lump-sum, not-to-exceed fee proposal for the scope of Services. The fee proposal shall include hourly rates for all personnel for “Additional Work” (as such term is defined in the proposed Agreement attached herein).
FEE_25_City_of_Palm_Desert_-_Park_and_Trailhead_Engineering_and_Design.pdf
3. Non-Collusion Declaration*
The undersigned declares:
I am an authorized representative of my company, the party making the foregoing Bid, to certify the following.
The Bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The Bid is genuine and not collusive or sham. The Bidder has not directly or indirectly induced or solicited any other Bidder to put in a false or sham bid. The Bidder has not directly or indirectly colluded, conspired, connived, or agreed with any Bidder or anyone 1093
[INTERWEST CONSULTING GROUP, INC.] RESPONSE DOCUMENT REPORT RFP No. 2024-RFP-156
Park and Trailhead Engineering and Design
[INTERWEST CONSULTING GROUP, INC.] RESPONSE DOCUMENT REPORT Request For Proposal - Park and Trailhead Engineering and Design
else to put in a sham bid, or to refrain from bidding. The Bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the Bid Price of the Bidder or any other Bidder, or to fix any overhead, profit, or cost element of the Bid Price, or of that of any other Bidder. All statements contained in the Bid are true. The Bidder has not, directly or indirectly, submitted his or her Bid Price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.
Any person executing this declaration on behalf of a Bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the Bidder.
I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct.
Confirmed
4. SAM.gov*
Please enter your legal entity name for SAM.gov verification.
Interwest Consulting Group, Inc.
Click to Verify Value will be copied to clipboard
5. Type of Business*
C Corporation (if corporation, two signatures are required)
6. Litigation*
Provide litigation history for any claims filed by your firm or against your firm related to the provision of Services in the last five (5) years (or type "N/A").
SAFEbuilt vs. BPR - June 2022 - Complaint by Interwest & SAFEbuilt against BPR and several former Interwest employees alleging various unfair competitive practices. Status: Open. Discovery is ongoing. 1094
[INTERWEST CONSULTING GROUP, INC.] RESPONSE DOCUMENT REPORT RFP No. 2024-RFP-156
Park and Trailhead Engineering and Design
[INTERWEST CONSULTING GROUP, INC.] RESPONSE DOCUMENT REPORT Request For Proposal - Park and Trailhead Engineering and Design
Frontier vs. Elk Grove - May 2023 - Frontier alleges damage to fiber optic cable due to work performed on a City civil engineering project for which Interwest provides management services. City tendered the claim to Interwest. Status: Open.
7. Changes to Agreement*
The City standard professional services agreement contract is included as an attachment herein. The Proposer shall identify any objections to and/or request changes to the standard contract language in this section of the proposal (or type "N/A"). If you are identifying changes here ALSO upload a copy of the redlined Language/Agreement with your Proposal. Changes requested may affect theCity's decision to enter into an Agreement.
Interwest respectfully requests the following modifications to the City’s standard professional services agreement indicated in bold below:
3.2.11.2 Other Provisions or Requirements.
(C) Except with respect to Workers’ Compensation Insurance, Primary/Non-Contributing. Coverage provided by Consultant shall be primary and any insurance or self-insurance procured or maintained by City shall not be required to contribute with it. The limits of insurance required herein may be satisfied by a combination of primary and umbrella or excess insurance. Any umbrella or excess insurance shall contain or be endorsed to contain a provision that such coverage shall also apply on a primary and non-contributory basis for the benefit of City before the City’s own insurance or self-insurance shall be called upon to protect it as a named insured. (H) Requirements Not Limiting. Requirements of specific coverage features or limits contained in this Section are not intended as a limitation on coverage, limits or other requirements, or a waiver of any coverage normally provided by any insurance. Specific reference to a given coverage feature is for purposes of clarification only as it pertains to a given issue and is not intended by any party or insured to be all inclusive, or to the exclusion of other coverage, or a waiver of any type. (If the Consultant maintains higher limits than the minimums shown above, the City requires and shall be entitled to coverage for the higher limits maintained by the Consultant. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City. (remove))
Note: We have insurance to cover all of our business; we allocate that by contract. You may receive the benefit of higher limits or not, depending on the number and nature of claims filed.
3.6.3.3 Right to Use. City shall not be limited in any way in its use or reuse of the Documents and Data or any part of them at any time for purposes of this Project or another project, provided that any such use not within the purposes intended by this Agreement 1095
[INTERWEST CONSULTING GROUP, INC.] RESPONSE DOCUMENT REPORT RFP No. 2024-RFP-156
Park and Trailhead Engineering and Design
[INTERWEST CONSULTING GROUP, INC.] RESPONSE DOCUMENT REPORT Request For Proposal - Park and Trailhead Engineering and Design
or on a project other than this Project without employing the services of Consultant shall be at City’s sole risk. If City uses or reuses the Documents & Data on any project other than this Project, it shall remove the Consultant’s seal from the Documents & Data and indemnify and hold harmless Consultant and its officers, directors, agents, and employees from claims arising out of the negligent use or re-use of the Documents & Data on such other project. Consultant shall be responsible and liable for its Documents & Data, pursuant to the terms of this Agreement, only with respect to the condition of the Documents & Data at the time they are provided to the City upon completion, suspension, abandonment, or termination. Consultant shall not be responsible or liable for any revisions to the Documents & Data made by any party other than Consultant, a party for whom the Consultant is legally responsible or liable, or anyone approved by the Consultant. For the avoidance of doubt, nothing in this Agreement shall be understood to grant City rights to pre-existing intellectual property of Consultant, including Consultant software and licensed software, or to any improvements thereto.
3.6.3.4 Indemnification – Documents and Data. Consultant shall defend, indemnify and hold the City, its directors, officials, officers, employees, volunteers, agents and representatives free and harmless, pursuant to the indemnification provisions of this Agreement, for any alleged infringement of any patent, copyright, trade secret, trade name, trademark, or any other proprietary right of any person or entity in consequence of the use on the Project by City of the Documents & Data, including any method, process, product, or concept specified or depicted. City represents and warrants that it has sufficient rights in any Documents & Data provided by it, or on its behalf, to Consultant for Consultant to perform its obligations under this Agreement and City hereby grants Consultant a fully paid up, temporary and non-transferrable license reproduce, create derivative works of and otherwise use such Documents and Data solely as necessary for Consultant and its subcontractors, if any, to perform services pursuant to this Agreement.
3.6.3.6 Confidential Information. The City shall refrain from releasing Consultant’s proprietary information (“Proprietary Information”) unless the City’s legal counsel determines that the release of the Proprietary Information is required by the California Public Records Act or other applicable state or federal law, or order of a court of competent jurisdiction, in which case the City shall notify Consultant of its intention to release Proprietary Information. Consultant shall have five (5) working days after receipt of the release notice to give City written notice of Consultant’s objection to the City’s release of Proprietary Information. Consultant shall indemnify, defend, and hold harmless the City, and its officers, directors, employees, agents, volunteers and representatives from and against all liability, loss, cost or expense (including attorney’s fees) arising out of a legal action brought to compel the release of Proprietary Information. City shall not release the Proprietary Information after receipt of an objection notice unless either: (1) Consultant fails to fully indemnify, defend (with City’s choice of legal counsel from Consultant’s insurance carrier’s panel counsel), and hold City harmless from any legal action brought to compel such release; and/or (2) a final and non-appealable order by a court of competent jurisdiction requires that City release such information. 1096
[INTERWEST CONSULTING GROUP, INC.] RESPONSE DOCUMENT REPORT RFP No. 2024-RFP-156
Park and Trailhead Engineering and Design
[INTERWEST CONSULTING GROUP, INC.] RESPONSE DOCUMENT REPORT Request For Proposal - Park and Trailhead Engineering and Design
3.6.6 Indemnification.
3.6.6.1 To the fullest extent permitted by law, Consultant shall defend (with counsel of City’s choosing and selected from Consultant’s insurance carrier’s panel counsel), indemnify and hold the City, its officials, officers, employees, volunteers, agents, and representatives free and harmless from any and all third-party claims, demands, causes of action, costs, expenses, liability, loss, damage or injury of any kind, in law or equity, to property or persons, including wrongful death, (in any manner (remove)) to the extent arising out of, pertaining to, or incident to any intentionally wrongful or negligent acts, errors or omissions, or willful misconduct of Consultant, its officials, officers, employees, subconsultants or agents in connection with the performance of the Consultant’s Services, the Project or this Agreement, including without limitation the payment of all expert witness fees, attorney’s fees and other related costs and expenses except such loss or damage caused by the sole or active negligence or willful misconduct of the City. Consultant’s obligation to indemnify shall survive expiration or termination of this Agreement and shall not be restricted to insurance proceeds, if any, received by Consultant, the City, its officials, officers, employees, agents, volunteers, or representatives.
Notwithstanding any provision of law to the contrary, Consultant shall have the right to control the defense and settlement of any action for which indemnification is sought, provided that it shall not enter into any settlement that requires an admission of wrongdoing by any indemnitees without that indemnitees’ approval. Consultant’s obligations under this Agreement are contingent upon timely receipt of notice of the claim for which indemnification is sought, such that defense of the claim is not prejudiced, and the reasonable assistance of the indemnitees in connection with the defense of the claim.
3.6.6.2 If Consultant’s obligation to defend, indemnify, and/or hold harmless arises out of Consultant’s performance as a “design professional” (as that term is defined under Civil Code section 2782.8), then, and only to the extent required by Civil Code section 2782.8, which is fully incorporated herein, Consultant’s indemnification obligation shall be limited to claims (that (remove)) to the extent that they arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant, and, upon agreement of parties or Consultant obtaining a final adjudication by a court of competent jurisdiction, Consultant’s liability for such claim, including the cost to defend, shall not exceed the Consultant’s proportionate percentage of fault.
3.6.12 Assignment; Subcontracting. Consultant shall not assign, sublet, or transfer this Agreement or any rights under or interest in this Agreement without the written consent of the City, (which may be withheld for any reason (remove)) which consent shall not be unreasonably delayed or withheld. Any attempt to so assign or so transfer without such consent shall be void and without legal effect and shall constitute grounds for termination. Consultant shall not subcontract any portion of the Services required by this Agreement, except as expressly stated herein, without prior written approval of City. Subcontracts, if any, shall contain a provision making them subject to all provisions stipulated in this Agreement. 1097
[INTERWEST CONSULTING GROUP, INC.] RESPONSE DOCUMENT REPORT RFP No. 2024-RFP-156
Park and Trailhead Engineering and Design
[INTERWEST CONSULTING GROUP, INC.] RESPONSE DOCUMENT REPORT Request For Proposal - Park and Trailhead Engineering and Design
8. No Deviations from the RFP*
In submitting a proposal in response to this RFP, Proposer is certifying that it takes no exceptions to this RFP including, but not limited to, the Agreement. If any exceptions are taken, such exceptions must be clearly noted here, and may be reason for rejection of the proposal. As such, Proposer is directed to carefully review the proposed Agreement and, in particular, the insurance and indemnification provisions therein (or type "N/A").
N/A
9. Project Team Resumes*
Submit resumes of all key personnel/support staff that will produce work product for the Services. Describe their qualifications, education, and professional licensing.
Palm_Desert_Resumes.pdf
10. List the Signatory(s) Authorized to Sign and Bind an Agreement.* (If two (2) signatures are required, include the following information for both signatories) A. Full Name
B. Title
C. Physical Business Address
D. Email Address
E. Phone Number
Paul Meschino, President - Interwest Consulting Group, Inc., 1 Jenner, Ste 160, Irvine, CA 92618, [email protected], 714.899.9039
Chris Giordano, CEO - SAFEbuilt, LLC, 1 Jenner, Ste 160, Irvine, CA 92618, [email protected], 714.899.9039 1098
[INTERWEST CONSULTING GROUP, INC.] RESPONSE DOCUMENT REPORT RFP No. 2024-RFP-156
Park and Trailhead Engineering and Design
[INTERWEST CONSULTING GROUP, INC.] RESPONSE DOCUMENT REPORT Request For Proposal - Park and Trailhead Engineering and Design
11. Conflict of Interest Disclosure*
The proposer understands that any and all relationships with construction firms that may submit bids for projects developed under this agreement will require full disclosure of any direct or indirect conflicts of interest, financial interests, relationships, and the nature of any relationships with any related project bid submitters; and that any violation of this provision may result in the immediate termination of the Agreement
Confirmed
12. Certification of Proposal*
The undersigned hereby submits its proposal and, by doing so, agrees to furnish services in accordance with the Request for Proposal (RFP), and to be bound by the terms and conditions of the RFP.
Confirmed
1099
CIT Y OF
PALM DESERT
Park and Trailhead Engineering and Design
2024-RFP-156
MAIN PROPOSAL CONTACT:
JULIETTE RYAN
Account Manager
562.723.9969
[email protected]
March 18, 2025 | 5:00 PM PST
www.interwestgrp.com
1100
THOUGHTFUL SOLUTIONS. THRIVING COMMUNITIES.
TABLE OF CONTENTS
A. Cover Letter............................................................................ 4 B. Experience and Technical Competence ................................ 6 C. Firm Staffing and Key Personnel...........................................13 D. Proposed Method to Accomplish the Work.........................19 Changes to Agreement .............................................................45 1101
Cover Letter A.
1102
www.interwestgrp.com
Building Department
Services
Planning and Urban
Design
City Engineering
Grant Writing and
Administration
Real Estate
Construction Management
Traffic Engineering and
Transportation Planning
Capital Project Delivery
Private Development
Services
1 Jenner
Suite 160
Irvine, CA 92618
Tel: 714.899.9039
ELK GROVE FREMONT FRESNO IRVINE ROSEVILLE SAN DIEGO LAS VEGAS Account Manager
Juliette Ryan
562.723.9969
[email protected]
March 18, 2025
Melanie Slater
Management Analyst
City of Palm Desert
73-510 Fred Waring Drive
Palm Desert, CA 92260
RE: Park and Trailhead Engineering and Design—2024-RFP-156 To the Evaluation Committee:
Interwest Consulting Group (Interwest) and the City of Palm Desert (City) have enjoyed a cooperative and constructive working relationship through the multiple contracts on which we have collaborated over recent years. We value our relationship with the City and continue to strive to provide services that will best serve the City, its visitors, and the community at large.
With nearly 400 employees, Interwest is large enough to serve your engineering and design requirements yet small enough to be responsive and tailor our services to the specific needs of the City. We are currently collaborating with the City on the North Palm Desert Community Park Project, providing similar services to those requested in the City’s RFP for Park and Trailhead Engineering and Design. Consequently, we are familiar with the City’s rules, regulations, codes, personnel, and stakeholders, and hope to continue to serve the City in a role in the future.
Our proven track record in park and trailhead design is demonstrated through successful projects such as the ongoing North Palm Desert Community Park, the near-complete Lake Dalwigk Park, and the completed Enchanted Hills Park.
For the City of Palm Desert Park and Trailhead Engineering and Design project, our multidisciplinary team offers a comprehensive, integrated approach that includes project management, construction oversight, public engagement, and sustainabilitydriven design. Leveraging our affiliation with SAFEbuilt, LLC, we have access to over 1,600 professionals nationwide, ensuring resource availability and top-tier expertise across disciplines.
Our methodology is rooted in the Plan, Execute, Control, Optimize (PECO) framework, which prioritizes efficiency, stakeholder collaboration, and quality assurance. With an emphasis on community-focused, resilient, and innovative design, our team is committed to delivering a project that enhances public connectivity, sustainability, and multi-generational engagement.
We acknowledge receipt of Addendum #1 dated February 24, 2025, and Addendum #2 dated February 27, 2025.
As President of Interwest, I am authorized to sign any agreements that may result from this proposal and will provide contract support to the proposed Interwest Team. Should any questions arise, please contact me at [email protected] or 619.372.9962.
Sincerely,
Paul Meschino, President
Interwest Consulting Group
Chris Giordano, CEO
SAFEbuilt, LLC
1103
Ex per i en ce a n d
Tec h n i c a l C o m peten ce B.
1104
THOUGHTFUL SOLUTIONS. THRIVING COMMUNITIES. 6
City of Palm Desert | Park and Trailhead Engineering and Design | 2024-RFP-156 B. Experience and Technical Competence
Background
Interwest has extensive experience and a proven track record of successfully providing civil engineering services, grant management services, various development applications and/or specific plans, and California Environmental Quality Act (CEQA) compliance to public agencies for 23 years. We currently serve more than 330 public agencies, providing planning, capital project design, public works services, construction, and inspection services.
Within the last five years, Interwest has provided project and construction management, design, engineering, inspection, grant management, environmental and regulatory compliance, public engagement, and interagency coordination services for similar projects throughout California, including the following:
• North Palm Desert Community Park, Palm Desert, CA
• Lake Dalwigk Park, Vallejo, CA
• Antelope Creek Park, Woodlake, CA
• Enchanted Hills Park, Perris, CA
• Foss Field Park, Perris, CA
• Holbrook Palmer Park, Atherton, CA
One of the main reasons for Interwest’s successful completion of multidisciplinary projects is our deep bench of experienced professionals in the required disciplines. In 2020, Interwest became a wholly owned subsidiary of SAFEbuilt, LLC. Interwest, combined with our subsidiaries, employs nearly 400 professional staff in California, supported by SAFEbuilt’s larger resources of 1,600+ national employees. Our employees span a multitude of disciplines, roles, and job placements to municipalities within public works departments throughout California.
YEAR FOUNDED &
BUSINESS STRUCTURE:
2002, Corporation
FIRM CAPACITY:
Nearly 400 Employees
PROJECT OFFICE:
1 Jenner Suite 160
Irvine, CA 92618
SERVICES INTERWEST
PROVIDES:
Building Safety
Capital Projects
City Engineering
Construction Management
Development Services
Grant Writing & Administration
Land Development Design
Planning & Urban Design
Right of Way & Real Estate
Traffic Engineering
Transportation Planning
Transportation Programming
1105
THOUGHTFUL SOLUTIONS. THRIVING COMMUNITIES. 7
City of Palm Desert | Park and Trailhead Engineering and Design | 2024-RFP-156
CENTRAL CALIFORNIA
1171 West Shaw Ave., Suite 102
Fresno, CA 93711
559.448.9839 Phone
SOUTHERN CALIFORNIA
1 Jenner, Suite 160
Irvine, CA 92618
949.299.5300 Phone
1500 S. Haven Ave., Suite 220
Ontario, CA 91761
909.295.3142 Phone
9320 Chesapeake Drive, Suite 208
San Diego, CA 92123
858.560.1468 Phone
1221 .S. San Jacinto Avenue
San Jacinto, CA 92583
951.654.3592 Phone
NORTHERN CALIFORNIA
9300 W. Stockton Blvd., Suite 105
Elk Grove, CA 95758
916.683.3340 Phone
39355 California Street, Suite 200
Fremont, CA 94538
510.796.3003 Phone
1613 Santa Clara Drive, Suite 100
Roseville, CA 95661
916.781.6600 Phone
NEVADA
5770 West Teco Avenue
Las Vegas, NV 89118
702.476.2200 Phone
COLORADO
444 N. Cleveland Avenue
Loveland, CO 80537
866.977.4111 Phone
Office Locations
Organizational Structure
The Riverside Company of Cleveland, Ohio fully owns SAFEbuilt, LLC, and its family of companies. SAFEbuilt, LLC is headquartered in Loveland, Colorado. Since 2014, SAFEbuilt has acquired 17 companies across the country, bringing our current footprint to 39 states plus the District of Columbia.
PRIVATE PROVIDER SERVICES, LLC
A Company
The SAFEbuilt Family of Brands
1106
THOUGHTFUL SOLUTIONS. THRIVING COMMUNITIES. 8
City of Palm Desert | Park and Trailhead Engineering and Design | 2024-RFP-156 References
Client
City Vallejo
555 Santa Clara Street
Vallejo, CA 94590
Reference
Melissa Tigbao
Public Works Director
707.648.4316
[email protected]
Project Dates
2022 - 2024
Services Provided
Construction Management &
Inspection
Park Master Planning
Public Outreach
Clean California Grant Management
Traffic Design
Civil Design
Landscape Design
Construction Cost
$4.7 million
Project Team
Gianno Feoli
Dominic Mack
Sophia Neves
Bill Evans
Scott Harrison
LAKE DALWIGK PARK
Vallejo, CA
Interwest is providing design, project management, construction management and inspection services to handle the full delivery of the $4.7 million Lake Dalwigk Project which was recently approved for a Clean CA Local Grant Program by Caltrans. The City’s Public Works Department has been managing this project in partnership with the VFWD and GVRD. These three agencies partnered to submit an application for Clean CA Local Grant Program funding. Each agency has various ownership and oversight of Lake Dalwigk Park and plays a role in the implementation of the Project.
This project provides for the improvement and beautification of Lake Dalwigk Park and enhanced community connections from the surrounding neighborhoods into the park. Specific elements include 3.8 acres of drought tolerant landscaping, replacement of broken concrete pedestrian path including grading for ADA access; adding prefabricated restrooms and connecting to existing utilities; extensive pathway and park lighting utilizing solar and/or low voltage LED lights. A paved bike/pedestrian path will provide ADA access across the park to the Curtola Park and Ride facility. A degraded and vandalized culvert with a non-ADA-compliant bridge will be restored to provide an attractive and accessible connection. The degraded sidewalk along Lemon Street will be replaced with decorative concrete, plus traffic calming measures including 11 decorative stamped crosswalks. Two new monument signs, picnic tables, trash cans, dog waste stations, shade structures, and drinking fountains will be installed.
1107
THOUGHTFUL SOLUTIONS. THRIVING COMMUNITIES. 9
City of Palm Desert | Park and Trailhead Engineering and Design | 2024-RFP-156 Client
City of Perris
101 N. D Street
Perris, CA 92570
Reference
Sabrina Chavez
Director of Community Services
951.943.6603
[email protected]
Project Dates
2019—2022
Services Provided
Prop 68 Grant Application
Construction Management
Construction Inspection
Design Oversight
Quality Assurance/Quality
Control
Construction Cost
$10 million
Project Team
Bill Evans (PM/CM)
ENCHANTED HILLS PARK
Perris, CA
Formerly 22 acres of blighted property, Enchanted Hills Park is now a robust park space for the City of Perris. The design team added active park play elements such as multiple playground structures, splash play, a skate spot, zip lines, BMX track, and basketball courts. More relaxed park features include trails and walking paths, shaded seating, picnic and barbecue areas, and a large lawn area. Users can appreciate local culture by viewing ceramic art tiles drawn by local elementary school children or visiting the painted rock murals. The design also incorporates onsite stormwater features, native plant gardens, and low water use irrigation to bolster long-term sustainability.
Interpretive signage throughout the park educates users on the importance of certain sustainable design elements throughout the site.
Enchanted Hills Park was selected as the 2022 California Park & Recreation Society (CPRS) Award of Excellence recipient in the Excellence in Design— Park Planning category. The CPRS awards program recognizes outstanding achievement in the areas of facility design, park planning, marketing and communication, and community improvement and programming. Enchanted Hills also won Midsize Park of the year through the American Public Works Association (APWA) and is the running for National Park of the Year through the National Recreation and Park Association (NRPA).
AwardWinning
Project
1108
THOUGHTFUL SOLUTIONS. THRIVING COMMUNITIES. 10
City of Palm Desert | Park and Trailhead Engineering and Design | 2024-RFP-156 Client
City of Miami Beach
1701 Meridian Ave, 3rd Floor
Miami Beach, FL 33139
Reference
Ariel Guitian
Senior Capital Projects
Coordinator, Office of CIP
305.673.7071 x 4105
[email protected]
Project Dates
2016 - Present
Services Provided
Landscape Architecture
Civil Engineering
Electrical Engineering
Resiliency Design
Environmental Permitting
Construction Administration
Arch Visualizations & 3D
Construction Cost
$10.3 million
Project Team
Gianno Feoli
Dominic Mack
Sophia Neves
NORTH BEACH OCEANSIDE PARK
North Beach, FL
The City of Miami Beach desired a park redesign from a previously denselyvegetated, 30-acre park to one that defines a new identity for the North Beach community. The design resulted in a necklace of ‘pods’ that operate as a spine to the project and serve to protect habitat and increase the City’s management of these natural resources.
Walkways are scaled to foster continuous activities in multiply configurable ways and augments the opportunities for resiliency design by strengthening the dune, utilizing passive green infrastructure and LID stormwater management strategies. The project also incorporates a rebranding of the City’s established beachfront with an on-grade beachwalk destined to be a terminus to the City’s transportation infrastructure.
The product developed for the Park is one that provides a transformative quality for the North Beach Community, enhances cultural celebration, and embodies the City’s values of purposeful environmental design and access to great public spaces.
1109
THOUGHTFUL SOLUTIONS. THRIVING COMMUNITIES. 11
City of Palm Desert | Park and Trailhead Engineering and Design | 2024-RFP-156 Client
Town of Davie
6591 Orange Dept
Davie, Florida 33314
Reference
David Flaherty
Director
Parks, Recreation and
Cultural Arts
954-797-1151
[email protected]
Project Dates
2016 - 2024
Services Provided
Landscape Architecture
Civil Engineering
Electrical Engineering
Construction Administration
Construction Cost
$2.4 million
Project Team
Gianno Feoli
Michael Conner
Dominic Mack
BAMFORD PARK SYNTHETIC TURF FIELDS
Davie, FL
Calvin, Giordano & Associates, Inc. was selected by the Town of Davie to provide design, and construction services to convert two existing natural grass playing fields (Bronco and Mustang) to artificial turf at Bamford Park. The Town indicated their desire to have the fields converted to slit-film artificial turf consisting using a three-layered heat reducing composite infill material of selected graded sand, S.B.R. crumb rubber, or similar material, and a top layer of composite material with heat reducing properties to provide for player safety and a more enjoyable experience during hot summer months.
The project included the design for installation of artificial turf and a drainage system for the Bronco and Mustang Fields, ADA compliant sidewalk improvements, grading, and retaining wall design. The fields will serve multiple sports, including full length soccer for 11 vs 11 (U13 onwards), two small soccer fields for 9 vs 9 (up to U12), and full men’s lacrosse.
The project construction cost was $2.4 million and construction services were completed in 2024. Phase 2 is currently underway and is near completion. 1110
Fi r m Sta f f i n g a n d
Key Per s o n ne l C.
1111
THOUGHTFUL SOLUTIONS. THRIVING COMMUNITIES. 13
City of Palm Desert | Park and Trailhead Engineering and Design | 2024-RFP-156 C. Firm Staffing and Key Personnel
Key Personnel
Bill Evans
Professional-in-Charge
Bill is an experienced Project Manager who will and oversee the quality of services provided.
Bill has over 36 years of diversified experience serving in roles such as Project Manager, Public Works Director, and Assistant City Manager. His extensive experience in working in and with municipal agencies provides him with the skills and sensitivity to complete projects on time and within budget.
Scott Harrison, CPRP
Project Manager
Scott Harrison has 14 years of diversified experience as a Project Manager on a municipal level managing construction projects. He holds numerous certifications, particularly in the area of municipal parks and recreation facilities. His expertise encompasses the development, construction, infrastructure replacement, and design management, along with managing municipal capital improvement programs. He has often been responsible for the organization, developing standards for staff, scheduling, and implementation of various construction projects and programs.
Emily M. Stadnik
Assistant Project Manager
Emily has over 20 years of experience in local government and public utilities. She has worked in both the public and private sectors in land development as a project manager for capital improvement design engineering, managing engineering projects for plan check and inspection, and has worked on multiple capital campaigns for government affairs within the public utility space. She is experienced in developing effective and engaging public outreach campaigns, grant writing, process development, and creating policy. Emily has worked with the City in a project management role on both the North Palm Desert Community Park and Lupine Plaza projects.
Gianno Feoli, PLA, ASLA
Design Lead
With 24 years of experience, Gianno leads the Landscape Department in creative design strategies for urban environments with specialties including urban design, contextual analysis, and branding. He has experience in coordinating design implementation within built-out urban environments, public outreach, and report preparation, where he will lead the effort in the creation of a graphically-rich, easily legible report. His experience has encompassed a wide array of project-types, and his strengths lie in client responsiveness, project organization, public outreach, connectivity plans, streetscapes and urban interventions, park design, and form-based urban designs and planning strategies. Gianno currently serves as the Design Lead on the North Palm Desert Community Park Project for the City of Palm Desert.
1112
THOUGHTFUL SOLUTIONS. THRIVING COMMUNITIES. 14
City of Palm Desert | Park and Trailhead Engineering and Design | 2024-RFP-156 Organizational Chart
PROJECT MANAGEMENT
Scott Harrison, CPRP |
Project Manager
Emily M. Stadnik |
Asst. Project Manager
PROFESSIONAL-IN-CHARGE
Bill Evans
ACCOUNT MANAGER
Juliette Ryan
INTERWEST TEAM
Civil Engineering
Stuart McKibbin, PE
Landscape Architecture
Lawrence H. Morita, PLA
Grant Writing
Helen Maggitti
Design
Gianno Feoli, PLA, ASLA | Design Lead
Dominic Mack, PLA, ASLA |
Landscape Design Architect
Environmental Consulting
Richard Walker
SUBCONSULTANTS
Geotechnical Engineering
Ninyo & Moore
Garreth Saiki, PE, GE
Surveying
UNICO Engineering
Rob Markes | Survey Manager
Ryan Ming, PLS | Sr. Land Surveyor
Architecture
Holt Architecture
Thomas Howell, RA | Senior Principal
Matt Acton, RA | Project Manager
Mechanical Engineering
P2S Inc.
Scott Newman, PE |
Mechanical Engineer
Electrical Engineering
P2S Inc.
Lars Hendeson, EE |
Lead Electrical Engineer
Plumbing
P2S Inc.
Eric Gomez | Plumbing Engineer
Commissioning
PS2 Inc.
Bryant Mercado |
Senior Commissioning Agent
Structural Engineer
Wiseman + Rohy
Steve Rohy, SE |
Structural Engineer
Irrigation
Irri Design Studio (IDS)
Connor Zielinski, ASIC, ASLA
1113
THOUGHTFUL SOLUTIONS. THRIVING COMMUNITIES. 15
City of Palm Desert | Park and Trailhead Engineering and Design | 2024-RFP-156 Adequacy of Labor Resources
Interwest ensures the availability of our staff never goes below 40% for our senior staff and 60% for our technical support staff. We maintain this strategy to allow us to meet the unexpected demands of our clients without sacrificing the needs of others. Interwest guarantees that the City will have our availability, access to our top level management, and that we will have the necessary staff to meet all project needs.
As part of the SAFEbuilt family of companies, Interwest has access to more than 1,600 professionals in multiple disciplines to meet the Engineering and Design needs of the City as well as needs you may have for other services.
Subcontractors
Ninyo & Moore
Geotechnical Engineering
Established in 1986, Ninyo & Moore is one of the largest engineering firms in the country specializing in Geotechnical Engineering, Environmental Engineering and Materials Testing and Inspection Services. Engineering News Record (ENR) recognizes the firm as one of the Top 500 Design Firms in the United States. The firm provides consulting services in geotechnical engineering, construction inspection and testing, engineering geology, hydrogeology, hazardous waste remediation and environmental assessment. Their staff of 600 professionals includes experienced and registered geotechnical engineers, civil engineers, environmental engineers, engineering geologists, hydrogeologists, environmental scientists, certified technicians and field inspectors, and hazardous waste and regulatory compliance specialists.
Ninyo & Moore offers a variety of geotechnical engineering, environmental and materials testing and inspection services for recreational projects. Ninyo & Moore is experienced in all phases of design, construction, and rehabilitation of parks, bike and pedestrian trails, gymnasiums, sports fields, beach facilities, comfort stations, nature centers, fairgrounds, and other infrastructure. Ninyo & Moore’s team of qualified professionals has extensive experience performing services in accordance with the applicable municipal and building codes.
Ninyo & Moore has fully equipped and certified in-house testing laboratories that offer full-service field and laboratory services for geotechnical design, and soil and materials testing projects.
Ninyo & Moore serves its clients through 16 offices in California, Arizona, Nevada, Colorado, Utah, and Texas.
UNICO Engineering
Surveying
Established in 2013, UNICO Engineering (UNICO) is a certified DBE firm that is fully committed to providing high-quality construction management, engineering, and land surveying services to public and private clients. UNICO serves clients throughout California with a current staff of over 110 from our corporate office located in Folsom, with branch offices in Concord, Oakland, San Diego, and Goleta, and field offices in Sacramento, Woodland, Paradise, and Angels Camp. UNICO provides value to their clients by sharing their goal of effectively managing the costs of the projects to which they are assigned. UNICO’s survey team has the technology and experience to address any of your surveying needs, including topographic mapping, bathymetric (hydrographic) surveys, ALTAs, boundary surveys, construction staking, easements, aerial surveys, right of ways, terrestrial LiDAR scanning and drone surveying. Using the latest in GPS and robotic total station technology, we work efficiently and deliver accurate results. UNICO is experienced in delivering projects that meet local, state, and federal requirements. 1114
THOUGHTFUL SOLUTIONS. THRIVING COMMUNITIES. 16
City of Palm Desert | Park and Trailhead Engineering and Design | 2024-RFP-156 Holt Architecture
Architecture
Holt Architecture (Holt) is a service-orientated practice with 40+ years of helping to build for the needs of communities with designs that enrich the community and environment.
The best reflection of Holt’s qualifications is the fact that the vast majority of their work comes from repeat clients and referrals. They credit their success to the fact that they are more responsive to the needs of the Project, facilitate their clients’ efforts working as an extension of their staff, and adapt well to changing conditions. As a smaller firm, Holt offers highly personal service and the ability to adjust to the unique requirements of each project.
P2S Inc.
Mechanical Engineering / Electrical Engineering / Plumbing P2S Inc., a Legence Company, is a consulting engineering, commissioning (Cx) and construction management (CM) firm committed to innovative designs, sustainable solutions, and exceptional client service. They design high-performance building systems, infrastructure and central plants that reduce operating costs while providing optimal indoor conditions and user comfort.
Legence is a national end-to-end energy efficiency solutions provider. The P2S partnership with Legence offers clients a unique and more robust set of services with a purposeful mission to decarbonize the built environment.
P2S now has more resources for clients and are connected to a nationwide network of AEC industry firms and professionals. They can offer clients and staff more opportunities, services, and value.
P2S Inc. has offices in Long Beach, Seattle, San Diego, Irvine, Los Angeles, and San Jose.
Wiseman + Rohy
Structural Engineering
Wiseman + Rohy Structural Engineers has been involved with the design of civic and community projects for over 40 years. They embrace these projects, as they embody the type of work they enjoy and strive for—specialty buildings that offer a reward back to the community and users of the structure.
These structures have certain core goals:
• Use available funds in the most efficient way possible • Be adaptable for many different uses
• Have the ability to change over time as needs evolve
• Be as low maintenance as possible
Through the principles of lean design, Wiseman + Rohy are successful in identifying required information early, scheduling tasks in an order to accomplish goals without backtracking, and coordination with all other consultants to ensure these values are used throughout the team. This approach dramatically reduces waste in design time and construction materials and results in a better coordinated, higher efficiency structure with a fast-moving construction phase.
1115
THOUGHTFUL SOLUTIONS. THRIVING COMMUNITIES. 17
City of Palm Desert | Park and Trailhead Engineering and Design | 2024-RFP-156 Irri Design Studio
Irrigation Design
Irri Design Studio (IDS) proudly stands at the forefront of irrigation design and consulting in the United States, setting the gold standard for excellence and innovation. Their relentless commitment to conserving water resources while delivering top-tier solutions has solidified their position as a trusted industry leader. As IDS expands operations globally, they carry a vision of sustainability and responsibility, aiming to play a pivotal role in safeguarding the world’s water supply for future generations. Their dedicated team of experts is dedicated to crafting irrigation systems that not only meet the highest standards of efficiency and performance, but also embrace environmentally conscious practices. IDS is more than a consultancy; it’s a driving force in the mission to preserve our planet’s most precious resource, water, for a brighter and more sustainable tomorrow.
1116
D. Pr o p o sed Meth o d to
Ac c o m p l i s h the Wo rk
1117
THOUGHTFUL SOLUTIONS. THRIVING COMMUNITIES. 19
City of Palm Desert | Park and Trailhead Engineering and Design | 2024-RFP-156 D. Proposed Method to Accomplish the Work
General Project Management Approach
Our project management approach begins with applying
our Plan, Execute, Control, Optimize (PECO) philosophy. The PECO framework, illustrated to the right, is based on our team’s experience and industry best practices endorsed by the Project Management Institute. We
identify, prioritize, allocate, manage, and
control the work requirements through
this singular, integrated method.
Using the PECO framework, the Interwest team delivers
a project management approach that combines the right
people, processes, and tools to perform the Scope of Services requirements. The Interwest team’s process is structured to streamline our resources and provide responsive services.
Successful execution of public works services starts with a responsive team structure that can anticipate and address resource needs.
Our team works on multiple tasks simultaneously and our organizational structure supports the staff in overseeing this process effectively. Project Manager, Scott Harrison, CPRP, will ensure overall project performance and completion.
PLAN
OPTIMIZE EXECUTE
CONTROL
INFORMATION
DIRECTION,
COORDINATION
& INFORMATION
DIRECTION &
COORDINATION
DAILY STATUS
REPORT
DIRECTION &
COORDINATION
DIRECT COORDINATION
The PECO framework delivers a contract
management approach that combines the
right people, processes, and tools to perform
contract work.
Approach to Communication & Coordination
One of the keys to the efficient and successful flow
of information is clear, effective communication.
Everyone involved with a contract of this size
and scope must be aware of changes, progress,
and challenges. We commit to working with you
to determine the best ways to communicate the
right information to the right people at the right
time. Our priority is to ensure the best possible
experience working with our team—with minimum
impact on the City and its citizens.
Meetings are an integral part of the plan,
especially at contract start-up. Everyone involved
must be aware of progress and changes to expect
going forward. We will prepare communications
that can be shared with all City staff, detailing
what to expect during contract transition and
moving forward.
We work with you to develop a schedule and format to meet your needs for aggregate reporting. Report formats may include monthly, quarterly, and annual reports summarizing activity levels, adherence to performance metrics, and other items of special interest to the City. We ensure our work effort is clearly communicated to the City throughout the contract’s life, adjusting as necessary.
QUANTITATIVE METHOD
QUALITATIVE FREQUENCY
Identification and selection
of metrics and information
to be provided
How the data and information
will be communicated
How often
information and data
is to be provided
Information requested
by key decision makers
and stakeholders
INTERWEST’S COMMUNICATION APPROACH
1118
THOUGHTFUL SOLUTIONS. THRIVING COMMUNITIES. 20
City of Palm Desert | Park and Trailhead Engineering and Design | 2024-RFP-156 STEP 1: DEFINING THE CRITICAL
PROJECT SUCCESS FACTORS
Our first step towards ensuring that we understand
the expectations of the project by the public, elected
officials, staff, and stakeholders is defining the critical success factors. This understanding underpins all
decisions that will be made and will help guide
the metrics for the project. The ability to derive this understanding comes from close collaboration and
open dialogue between the various parties shaping
and guiding the project. Specifically, in the case of
this park development, decisions about what the final
outcome of the project should be need to be made
through an ample exploration of all the options on
the table, tempered and informed by the direction
obtained from the City and an outreach component
that will include the community that will be impacted
and catered to. We recognize that, as it stands, the
selected park locations provide a great and unique
opportunity to accomplish the following:
• Provide connectivity to the direct, and indirect,
urban context;
• Establish an integrated, unique, and resilient
community-focused identity; and
• Activate the spaces with multi-generational and
community-strengthening opportunities.
Our goal is to align these opportunities with the
directives and values of the community, as they may
well serve as opportunities to augment what the
project has to offer and make it a key highlight project for the City.
STEP 2: DEPLOYING THE EXPERTISE
AND KNOWLEDGE OF THE PROJECT
TEAM MEMBERS TO INNOVATE
The seamless collaboration of the project team with City Staff will be the most successful driver for the success of the project. We have selected the appropriate team to
ensure that we deliver the best solutions to successfully satisfy this project. While having the right people is
important, we go a step further by capitalizing the
offerings of knowledge, experience, and ideas each
team member offers through a collaborative processes
of ideas and solutions development. This empowers
each team member and City Staff with the ability to
bring issues to the table to identify and resolve design conflicts early on. Over the life of the project, this results in a smoother transition from design to construction
and results in a dramatic reduction of conflicts during construction. It ensures that we meet the expectations
of the community, whom we are there to serve.
Building upon how the critical project success factors
are defined, Interwest will have routine collaborative, in-house design sessions to identify the various
opportunities where the metrics and desires for the
projects can be achieved, track progress, and ensure
that any competing and conflicting issues are met.
We would encourage the participation of City Staff
at key milestones to ensure that design decisions
and recommendations are being made in light of the
needs and desires of the City - factoring both issues of design, operations, and maintenance. It is through a
collaborative, real-time response design strategy that
the Team will generate workable solutions.
STEP 3: CHARTING A WORKFLOW AND
A CRITICAL PATH THAT IS CUSTOMIZED
AROUND THE SPECIFIC, UNIQUE
ISSUES OF THIS PROJECT
Upon award of the project, Interwest will meet with
City Staff to clarify specific requirements of the project scope (specifically the City’s vision, residents’ and
community requests, and commitments), and define
the measurable performative outcomes for design that
will deem the project a success. The Project Manager
(PM) will prepare and submit a project schedule to
the City. Once the detailed scope and schedule are
approved by the City, they will be provided to the
Interwest members at an internal “Kick-off Meeting.”
The primary purpose of the “Kick-off Meeting” will be
to accomplish the following:
• Clarify the Quality Control/Quality Assurance
requirements to be followed;
• Discuss the critical design elements affecting the
overall schedule; and
• Review methods to ensure effective
communication is maintained throughout the
design process.
In conjunction with all necessary design research,
document acquisition and inventorying, the project
team will perform a design survey while simultaneously
beginning the utility coordination process by sending
out utility information request letters to all utility owners within the project limits. Additionally, coordination
WORK PLAN - APPROACH
1119
THOUGHTFUL SOLUTIONS. THRIVING COMMUNITIES. 21
City of Palm Desert | Park and Trailhead Engineering and Design | 2024-RFP-156 with key stakeholders, facilitated by City Staff, may also occur at these early stages to introduce the Project
Team to the key community members and begin the
public outreach process.
Once all the information has been assembled through
the inventory and data collection phase, design
schematics and analyses will begin. Site visits to the
park will be conducted to confirm utility and survey
information, as well as to familiarize the Project Team with the controlling design elements and issues that
the community may have already expressed concerns
about. These periodic site assessments will be critical throughout the life of the design project.
A design strategy will be developed to convey a theme
that will support a branding strategy. Once approved,
that conceptual design will be further developed
through the schematic design phase where additional
detail and preliminary engineering will be conducted.
The schematic plans will be utilized to begin the preapplication process with the review and permitting agencies, as well as any relevant stakeholders. Once
City Staff and the stakeholders’ input have been
obtained, the Project Team will enter the design
development phase and permitting process.
Throughout the design development phase, all
intricacies of the design strategy will be further
development for constructability. The construction
plans will be developed incorporating all the design
components created and approved throughout the
project’s schematic and design development phases.
Once the client and regulatory agencies approve
the final design, the construction documents will
be finalized and issued for bidding. Throughout the
process, the Project Team will be involved in multiple
meetings with the City to ensure the project is moving
in the intended direction, conforms to required
standards, and remains on schedule.
STEP 4: FINANCIAL OVERSIGHT
STRATEGY
Understanding the financial model (where the funding
originates, the sources of expenditures, and any potential limitations placed on the design) is important to the
success of this project. To achieve this, the Team will carefully track the project construction’s estimate from the early stages of the project and iterate them with
additional detail commensurate with the level of details of the design or construction plans. This is critical as current market costs change daily and are severely impacted by
shortages of materials and interruptions to supply chains.
Additionally, any specific allocations will be identified and the specific improvements eligible to be expensed
to those sources will be earmarked and identified for
good project accountability. Appropriate contingencies
will be included and utilized during the early stage cost estimates to account for the level of detail that is not yet completed. The contingency will reduce as the plans
approach construction document quality.
STEP 5: PRE-CONSTRUCTION PHASE
Develop Project Action Plans and Milestone
Schedules: Actionable, result-driven project
management strategies guarantee success, as they
provide opportunities to quantify the efficiency and
goal-fulfillment rates of the Team. We will generate
these action plans by discipline and ensure that they
become an embodiment of the critical project success
factors identified together with staff during contract
negotiation and the kick-off process. Nevertheless,
in conducting preliminary research to prepare for this
RFP response, we have ascertained the following for
each component:
Urban Design and Community Outreach: The
Project Team will inventory the existing site
conditions, analyze the park design, and evaluate
opportunities to provide overall enhancements that
can improve the potential issues available through
design innovation opportunities, especially as they
impact fronting properties and nearby or adjacent
uses, such as the schools.
Civil/Roadway/Drainage Engineering: A possible
design consideration that is available within the
existing conditions includes the opportunity to
provide sustainable, low impact development
solutions in grading, drainage, and planting.
Existing conditions will be analyzed and assessed to
be brought into compliance as part of the project.
Additionally, close coordination and collaboration
with our Team’s traffic engineer and urban designer
will occur to thoroughly explore all opportunities
for streetscape improvement elements.
Traffic Control/Maintenance of Traffic: During
construction of the improvements is a critical
scheduling and design component.
Utility Coordination: Will rely on obtaining design
tickets and identifying Utility Agency Owners/
Providers (UAO) with facilities within the project
limits and initial field reviews conducted in an effort to identify potential conflicts or limitations. Early
1120
THOUGHTFUL SOLUTIONS. THRIVING COMMUNITIES. 22
City of Palm Desert | Park and Trailhead Engineering and Design | 2024-RFP-156 and proactive communication and coordination
with the UAOs is a critical element in this process,
as sometimes the UAOs can suffer from delays in
responsiveness. The coordination effort will focus
on early identification, conflict avoidance, and
planning for utility adjustments, and relocations as
needed. The Project Team fully understands the
necessary commitment and level of effort involved
to successfully complete this task so it does not
hinder the design process or construction schedule.
Traffic Engineering: The action items that will be
addressed under this component will revolve
around ensuring that the design solutions are
compliant with applicable standards, where needed,
and where opportunities for innovation can be
accommodated. These will include considerations
on design strategies for traffic calming, the design
requirements for incorporating bike usage, and
safety enhancements for pedestrian connectivity.
Lighting: The parks will be in need of lighting.
Pedestrian-scale lighting, performative lighting,
and up-lighting for landscaping and street lighting
will all be considered for their practicality and for
their adherence to an overall design aesthetic
package to achieve a new image for the park.
Our team has experience coordinating for service
point upgrades or relocations, where necessary.
Additionally, selection of efficient LED fixtures with
full cut-off and ease of maintenance and upkeep
will be an important consideration, while keeping
in mind the brand and identity the City envisions.
Planting and Experience Design: The planting
design palette will include considerations for
the human experience and the recognizable,
memorable quality that can be achieved through
good design articulation. In developing the
design, the Project Team will take special care to
evaluate green design and sustainable alternatives,
informed by specialized research on the site’s
conditions, hydrology, and site characteristics. An
important objective will be to implement landscape
strategies and streetscape improvements that
foster increased pedestrian safety, promote good
tree and canopy coverage and health, and upgrade
community aesthetics that employ the practices of
water conservation (through the use of xeriscape
principles and appropriate plant detailing to ensure
proper root-growth and preventative infrastructure
impacts), as well as ensuring that the benefits of
sustainable stormwater management practices
through the use of landscaped bio-swales, pervious
pavement systems, and other strategies can be
capitalized upon. Additionally, the careful selection
of planting to minimize the need for irrigation
or long-term maintenance will be supported by
prioritizing plant species that are native and/or
have extreme- and high-tolerances for drought.
Quality Assurance/Quality Control: Throughout the
design process, the Team will monitor and report
on the progress, schedule, and cost estimates.
Additionally, throughout the design process, the
Team will implement our Quality Assurance/Quality
Control process. This process consists of a peer
review procedure, where a design group of internal
third-party, in-house professional designers not
directly involved with the project will review the
plan documents with a fresh perspective. They will
make observations and generate comments that
will need to be further addressed and resolved
by the Project Team. The multi-disciplined review
process also consists of a constructability review by
a member of the Construction Department. This
review ensures that the plans make sense from
a construction perspective and are intended to
minimize potential conflicts, errors, or omissions in
the field during construction.
STEP 6: CONSTRUCTION AND
PROJECT CLOSE-OUT
Bidding and Construction Administration: The Interwest
Team has experience assisting our clients in all aspects of bidding, including assistance during bidding,
attending the pre-bid meeting, creating minutes,
addenda preparation, responses to contractor RFIs,
and review of the bid package for recommendation of
the lowest responsive and responsible bidder.
As the design professional of record, we will provide the necessary support to provide post-design services. Once the contract is awarded, post-design services include
a hand-off meeting with the City and construction
administration leader, a pre-construction meeting with
the contractor, review and approval of shop drawings,
responses to RFIs, and support to the Construction
Project Manager as-needed during construction.
The Interwest Construction Team is prepared and
committed to provide expert services such as
contract negotiation, implementing quality control
and assurance programs, contract document review,
shop drawing logging and review, administration
of contractor RFIs, observation of field activity to
1121
THOUGHTFUL SOLUTIONS. THRIVING COMMUNITIES. 23
City of Palm Desert | Park and Trailhead Engineering and Design | 2024-RFP-156 ensure construction is completed in accordance with
construction documents, environmental and NPDES
monitoring, field report and documentation review, asbuilt review and record drawing preparation, agency/ permit closeout documentation, and certifications.
Project Close-Out: After substantial completion,
each discipline from the Interwest Team may conduct
an on-site inspection and create a punch list log for
the Construction Project Manager. The Construction
Project Manager will then review the log, compile all
disciplines, and submit to the contractor for action/
correction. Simultaneously, the Project Team may work
with the contractor to review the project as-builts,
warranty submittals, as well as any operating/owner’s
manuals required for the specific product. After
reviewing the final, approved as-builts, the Design
Team will work towards submitting the record drawings
to the permitting agencies in order to close out any/all open permits.
It is important to note that the Interwest Design Team’s philosophy and corresponding process to assure
quality in all our designs and work products integrates the following key components:
Initial Quality of Design: The first step of the QA/
QC process is to ensure that the design is of a
“high initial quality”. In other words, the preliminary design is one that has been carefully considered
and analyzed by an experienced park designer.
Multi-discipline Peer Review: The next step in
the QA/QC process is the performance of a multidiscipline peer review. This phase is undertaken by a team of designers from various disciplines within
the core team so that potential improvements
or innovative ideas can be introduced to further
improve the initial design.
Design-Decision Documentation: Documentation
is an important part of all projects. It is critically
important to fully document the assumptions,
reasoning, metrics, and calculations that lead up to
key design decisions made on a project, particularly
if safety issues are involved. The documentation
not only provides good records, but presents
another opportunity to ensure that the project is
well-aligned with the goals and objectives that it
needs to meet.
Constructability Review: The constructability of a
project is an important facet to consider during each
phase of design development. When a preliminary
design is nearing substantial completion, an inhouse constructability review by our Construction Team is completed.
Value Engineering: All projects will require some
value engineering. An integral part of the design
process is to produce a cost-effective project for
the owner and/or client at all stages to eliminate
the need to perform large component cuts at the
end of the project. This is also important to ensure
that the Team manages the expectations of the
community and that the team makes promises that
can be delivered.
Schedule and Budget: Budget and schedule
controls and QA/QC practices are essential with
any project. Interwest’s many repeat clients attest
to tour capabilities to meet time and cost budgets,
often completing projects ahead of schedule and
below budget. We believe that in addition to
using state-of-the-art estimating and scheduling
software, a well-trained and experience team of
Project Managers is essential in predicting where
problems may occur or arise so we can be proactive
in addressing their potential.
Controlling Costs to Minimize RFIs and Change
Orders: Conflicts during construction and the
generation of RFIs and change orders are generally
a result of either a lack of proper and adequate
investigation of the site’s constructability issues
or a lack of adequate coordination among and
between the various parties contributing to the
development of the overall construction set. The
Interwest Team takes a ‘head-on’ approach to both
of these potential conflict areas by understanding
that they are weak-points that could potentially
result in costly corrections during construction.
From the onset, our approach to the development
of proper and adequate design investigations is
fundamental to setting the process on the correct
course. Thorough and adequate surveying, utility
documentation, and sub-surface investigations are
an absolute essential component of the technical
foundation of any project. While design ideas and
iterations are being developed by the creative
design team, utility coordination, cost explorations
with utility companies and infrastructure analysis are
conducted to evaluate their impact on the future
design and cost. This will identify opportunities to
highlight potential risk factor in the implementation
of the project.
1122
THOUGHTFUL SOLUTIONS. THRIVING COMMUNITIES. 24
City of Palm Desert | Park and Trailhead Engineering and Design | 2024-RFP-156 Once the project development enters the
technical plans development phase, collaborative
design meetings are held routinely with all parties
involved. The creative design team will be present
to ensure that the vision of the project remains
integral to the design solution while scenariobuilding for each of the various conflict areas are highlighted and resolved among the various
contributing professional disciplines. Depending
on the complexity of the project, plans are routed
at 30-60-90% intervals (minimum) of development
through our in-house quality control process where
third-party reviewers from various disciplines assess
and evaluate the information on the plans and seek
for potential conflicts so they can be identified and
resolved. At times, these third-party reviewers are
in-house staff that are not directly related to the
given project’s team. Since the Interwest Team has
a large contingent of municipal plans reviewers on
hand serving various different municipalities, these
key individuals are generally the ones reviewing the
plans at each of the 30-60-90% intervals. However,
for more complex projects, before plans get to
the formal 30-60-90% interval reviews, interim
‘standing plans review’ meeting are held where
process plans are reviewed collectively among
the technical design team in anticipation of the
formal review and to which at least one third-party
engineer is involved.
These internal processes are a large contributor
to minimize and eliminate potential conflicts in
construction that are design related. RFIs and change
orders cannot realistically be entirely omitted from
any project. Contractors will always submit RFIs in
a persistent search to minimize expenses, facilitate
their constructability, and maximize their profitability.
Additionally, sometimes because of expedited
scheduling or lack of initial resources on the client’s side, corners may be cut at the initial investigation
phases of the project that ultimately result in unforeseen circumstances during construction. While either of
these cannot be entirely omitted, our in-house process
creates enough familiarity with all project components
by the various contributing team-members that
resolutions can be addressed promptly and in a manner
that is generally economically favorable to the client.
COST ESTIMATING
Interwest’s predominant services have been entirely
public-sector driven. As such, we fully understand
that cost overruns are a huge burden on the public
procurement process and our clients’ ability to deliver a project promised to the community within the allocated
adopted budget. We approach cost estimating with the
understanding that it plays a viral role in the success of a construction project and understand that proper cost
estimating can:
• Improve plans;
• Save money;
• Allow for better bid comparisons; and
• Reduce risk.
Construction costs during the design phase should be
as closely aligned to the expenses that the potential
contractor will have, as opposed to general ballpark
costs arrived at by unit costs based on areas. These
costs should reflect:
• Contingencies and Variances to cover
unexpected conditions that can arise or to cover
cost increases that can result from change orders,
delays, inclement weather, or market volatility.
• Equipment mark-ups to reflect the cost of any
specialized equipment that may be needed, given
the uniqueness of the project.
• Indirect Costs to reflect general conditions,
permit and inspection fees, administrative
expenses, overhead, insurance requirements,
bonding, security, and utilities.
• Labor Costs impacted by locally driven wages
and their related costs factored by the number
of workers and the necessary hours of work,
including overtime needed to meet the clientdetermined schedule. • Materials Costs that require a key understanding
of how market fluctuations and cost volatility that
can be accommodated.
• Professional Fees for any incidental specialty
engineering components of any project element.
• Quality-related Costs that impact the budget,
understanding that top-of-the-line finishes and
material selections, superior amenities can deliver
an aesthetically impressive design but generally at
a more expensive cost.
• Other incidental but critical expenses assessed
on a case-by-case basis, such as environmental
remediation, demolition, disposal, or clientmandated requirements that impact construction, such as project phasing.
1123
THOUGHTFUL SOLUTIONS. THRIVING COMMUNITIES. 25
City of Palm Desert | Park and Trailhead Engineering and Design | 2024-RFP-156 Costs are generally arrived at through careful research and at the confluence of various sources, depending
on the specifics of the project. In the past, Interwest has relied on three (3) key sources:
Historical Data: Many of our cost estimation methods
rely on historical data, such as the cost per square foot, the average labor costs per hour for trade specialties, and the units of work, such as the cost per element.
Because Interwest has various ongoing projects in
construction at any given time, in addition to having
a strong and robust Construction Engineering
and Inspection (CEI) department overseeing the
construction of projects designed by others, our
capacity to keep accurate and current tallies on costs is a resource that has proven reliable.
Cost Research: To access the most current cost data,
Interwest has relied on gathering contemporaneous
cost checks to increase accuracy. This can be achieved
through our long-standing and working relationships
with various construction companies with whom we
have performed past work with through design-build
partnerships. Where these don’t provide a reliable
cost data-point, we will rely on publications such as
the Walker’s Building Estimator’s Reference Book and
industry other databases, such as RSMeans, where
they perform cost research by frequently sampling
rates in hundreds of locations for labor, materials,
equipment, and contractor overhead. We have also
relied on incorporating current cost indexes which
reflect trends in prices for various construction inputs, as well as productivity and inflation via sources such
as the Turner Building Index modified for localized
regional variances.
Expert Judgment: The ability to quickly tap into
expert judgment of our highly skilled and extensively
experienced staff, either internally within any of our
subsidiaries or via our parent company SAFEbuilt,
gives us an opportunity safe-check costs and methodselection that impact costs.
Interwest always relies on bottom-up construction cost
estimating strategies, where we calculate total cost by adding the cost of each input on a construction project.
This may seem taxing for the early stages of design
iteration, but when accompanied by a heightened
contingency multiplier, it generates a reliable and
predictable forecaster of the eventual costs. These
contingency multipliers vary depending on the stage
of project development:
• 45% during early conceptual design development
phases
• 40% during schematic design development
phases
During Design Development:
• 30% at the 30% construction plans iteration phase
• 20% at the 60% construction plans iteration phase
• 15% at the 90% and 100% construction plans
iteration phase
These percentages are our norm, but they can be
modified depending on the complexity of the project.
Additionally, given the recent volatility in market
costs for materials, Interwest does not recommend
calculating the contingency for construction at less
than 15%, even for small projects.
To improve the accuracy of our estimates, Interwest
can employ the utilization of a three-point estimate
methodology, whereby high-, mid-, and low-point
unit costs are collected to generate a range of costs
that can help guide design decision making. This has
been incredibly valuable in some of our more complex
parks and open space projects where community input
requests don’t align with the budget allocation that
has been established by the government agency. As
such, they are an essential tool not only to forecast the potential cost of specific components, but to assist
in conflict facilitation, community buy-in, and design
resolution through the public outreach and design
adoption processes.
1124
THOUGHTFUL SOLUTIONS. THRIVING COMMUNITIES. 26
City of Palm Desert | Park and Trailhead Engineering and Design | 2024-RFP-156
SMALL SITE DEVELOPMENT
PARK & PLAYGROUND
PROJECTS
WORK PLAN
The following work plan is designed as a flexible framework to guide the planning, design, and implementation of diverse project types, whether small site developments or park and playground improvements. It establishes all the components and elements we would tailor in the custom work plan we would develop for each unique project and establishes clear processes—from data collection and community engagement through construction and closeout—while acknowledging that each individual project will have its own unique conditions, stakeholders, and regulatory considerations.
Once a specific project is identified, the exact details of scoping, timelines, permitting requirements, and partner agencies will be refined to ensure that the work plan aligns with the project’s particular needs, goals, and local context.
We have included a graphic that demonstrated the chronological order in which these small-scope projects are developed and delivered.
1125
THOUGHTFUL SOLUTIONS. THRIVING COMMUNITIES. 27
City of Palm Desert | Park and Trailhead Engineering and Design | 2024-RFP-156 • Creation of a Design Intent and Vision • Generally serves as a budgeting exercise • Identify size, location, and metrics of all components to be included • Provide layout strategies to-scale on a surveyed base • Identify final programming and uses of the future park • Finalize all areas and inter-relationships of uses and components • Serves as a basis to define and perform any added CEQA compliance needs and processes • Collection of all necessary background and foundational data needed to provide the services and generate a design • Plan graphic, defining general elements of the project’s wish list with general placement • Order of Magnitude Cost Estimate • Survey CADD files • Initial inventory and analysis • Community outreach preparation and collection incorporated • Services that are needed to administer and deliver the project• General project management services• Quality Assurance and Quality Control reviews and processes• Coordination with sub-consultants • Partnership with the City• Peppered throughout the development phases to keep the community involved• Preparation of a Public Engagement and Outreach Plan focused on obtaining the most inclusive and equitable process as possible
• Outcome to define program, approach, and design components for the park sites• Generate a series of outcome-driven action plans that are to be implemented in the conceptual design phase
WORK PRODUCT WORK PRODUCT
GENERAL SERVICES PUBLIC OUTREACH PROCESS
WORK PRODUCT WORK PRODUCT WORK PRODUCT• Detailed plan graphics and 3D illustrative graphics, defining general qualities of the project’s wish list • 30% Design Plans• Detailed Order of
Magnitude Cost Estimate
• Refined, detailed
plan graphics and 3D illustrative graphics
• Detailed Cost Estimate• 30%, 60% and 90%
Development Plans (considered 70% final construction drawings) • 100% Construction Plans• Permits and approvals• Specifications package• Bidding Package • Further development
of the Conceptual Plan based off approvals & directives • Development of the
‘look and feel’ of the project; establishes aesthetic parameters • Advance to the point
it meets criteria for submission to the City Council for approval • Plans will be considered
the 30% Design Plans
• Continue sub-consultant
coordination
• Further development
of the Schematic Plan based on sign-off and approval
• Development of site
plans and construction detailing to 70% completion of final construction plans • Focus is on
constructability and coordination across intersecting disciplines • Further coordination with
specialty trades: civil engineering, irrigation design, arborists, lighting design, electrical engineering, structural engineer, artists • Preliminary permit
research and application
• Finalization of the
construction plans into biddable construction sets
• Construction detailing• 100% specifications• Third-party constructability review
• Permitting• Building Department
Approval (if applicable)
• Coordination with
procurement processes for bid tabs, general conditions, and qualifications • Preparation of technical
specifications (if applicable)
• Preparation of the bid
tender form for inclusion in the solicitation package
• Assisting in the drafting
of comparable past experience requirements to be required of prospecting bidders • Distribution of bid
packages
• Provide responses to
RFIs that may result in the issuance of an addendum during the bidding phase • Verifying comparable
work and issuing an analysis with an overall evaluation of the bidders accompanied by a recommendation for award • Project Coordination• Project Financial
Oversight
• Pre-Construction Phase• Construction and Project
Close-out
STANDARD WORK PLAN
1126
THOUGHTFUL SOLUTIONS. THRIVING COMMUNITIES. 28
City of Palm Desert | Park and Trailhead Engineering and Design | 2024-RFP-156 I. PROJECT OVERVIEW AND OBJECTIVES
High-Level Description
• Summarize the background and purpose of
the proposed small site or park/playground
improvement.
• Highlight how the project aligns with the
public entity’s strategic goals (e.g., community
well-being, equitable access to recreation,
sustainability).
Key Objectives
• Outline overarching aims such as enhancing
public safety, improving aesthetics, expanding
recreational opportunities, or meeting ADA
accessibility standards.
• Emphasize alignment with broader municipal or
agency policies (e.g., comprehensive plans, parks
master plans).
II. SCOPE OF WORK AND DELIVERABLES
Project Scope
• Define inclusions: conceptual design, site
surveying, schematic design, design development,
construction documents, bidding assistance,
construction administration, etc.
• Note any exclusions: specialty studies (e.g.,
extensive environmental impact statements),
major off-site utility upgrades, or land acquisitions
(unless specified).
Deliverables
• Design Packages: Conceptual plans, schematic
designs, design development sets, and final
construction documents.
• Technical Reports: Site assessments (soil,
environmental), cost estimates, and feasibility
analyses.
• Specifications: Equipment, materials, and
workmanship requirements for play structures,
surfacing, landscaping, etc.
• Approvals & Sign-Offs: Formal acceptance of
each design phase (conceptual, schematic, design
development, and final).
III. PROJECT SCHEDULE AND MILESTONES
Timeline Overview
• Establish a rough schedule, from Foundation
Data Collection Phase (site investigations) to
Construction Support Phase (final inspections and
closeout).
• Highlight that exact timelines will be determined
once site constraints, funding cycles, and
permitting processes are known.
Major Milestones
• Foundation Data Collection: Site analysis,
preliminary meetings with stakeholders.
• Conceptual Design: Creation of initial concepts,
community outreach sessions.
• Foundation Data Collection: Site analysis,
preliminary meetings with stakeholders.
• Conceptual Design: Creation of initial concepts,
community outreach sessions.
• Schematic Design: Refinement of selected
concept, preliminary cost estimates.
• Design Development: Detailed plans, material
selections, updated cost estimates.
• Biddable Documents Preparation: Final drawings
and specifications suitable for contractor bidding.
• Bidding & Award Assistance: Issuing bid
packages, responding to bidder questions,
evaluating proposals.
• Construction Support: Site observations, submittal
reviews, final inspections.
Phased Deadlines
• If grants or funding allocations impose interim
deadlines, note them here.
• Emphasize that each phase’s duration will be
influenced by project size, permitting, and
stakeholder reviews.
IV. ROLES, RESPONSIBILITIES, AND
PROJECT TEAM
Key Stakeholders
• Client/Owner: City of Palm Desert.
SMALL-SCOPE WORK PLAN
1127
THOUGHTFUL SOLUTIONS. THRIVING COMMUNITIES. 29
City of Palm Desert | Park and Trailhead Engineering and Design | 2024-RFP-156 • Design Consultants: Landscape architects,
engineers, architects (as needed for structures),
specialty consultants (lighting, playground
equipment).
• Community Liaisons: Local neighborhood
associations, park user groups, or advocacy
organizations.
• Permitting Authorities: City of Palm Desert staff,
state agencies, or other regulatory bodies.
Organizational Structure
• Identify the primary point of contact for the
client and the lead project manager within the
consultant team.
• Establish a reporting hierarchy for design
decisions, cost approvals, and schedule changes.
V. BUDGET AND RESOURCE ALLOCATION
Budget Framework
• Provide an estimated cost breakdown by project
phase (design, construction documents, bidding,
construction support).
• Include allowances for contingencies (e.g.,
unforeseen site conditions, additional public
engagement sessions).
Funding Sources
• Note that capital improvement programs, grants,
or bonds may fund these public projects; detailed
funding plans will be confirmed per project.
• Outline processes for billing rates, reimbursable
expenses, and cost tracking.
Cost Control
• Implement cost monitoring at each phase—e.g.,
design-to-budget checks at schematic design and
design development stages.
• Use value engineering strategies if initial cost
estimates exceed project allocations.
VI. COMMUNICATIONS AND
STAKEHOLDER ENGAGEMENT PLAN
Communication Protocols
• Schedule regular project team meetings (weekly
or biweekly) for updates and decision-making.
• Define documentation standards: agendas,
meeting minutes, progress reports, and email
protocols.
Public Outreach Strategies
• Conduct community meetings or workshops
at key milestones (conceptual design, design
development) to gather input and keep the public
informed.
• Offer accessible communication methods (online
surveys, bilingual materials) if warranted by the
local demographic.
Permitting and Agency Coordination
• Plan for timely submissions to local or state
agencies for reviews and approvals.
• Maintain open lines of communication with any
boards or committees (e.g., park advisory boards).
VII. QUALITY MANAGEMENT PLAN
QA/QC Processes
• Assign senior staff or peer reviewers for key
deliverables (drawings, specs, cost estimates).
• Institute internal checklists at each design phase
to confirm code compliance, best practices, and
coordination across disciplines.
Review Checkpoints
• Incorporate formal reviews at conceptual,
schematic, and design development stages to
capture and address errors or inconsistencies
early.
• Obtain written sign-offs from the client or owner
before proceeding to the next milestone.
VIII. REGULATORY AND COMPLIANCE
REQUIREMENTS
Relevant Codes and Standards
• Acknowledge that specific building codes,
accessibility standards (ADA), playground safety
standards (ASTM/CPSC), and local ordinances
(e.g., water conservation) will apply.
• Clarify that any environmental regulations
(stormwater, floodplain management) will be
evaluated for each site.
Permitting Process
• Specify that all required permits—zoning
approvals, stormwater permits, environmental
clearances—will be identified once the project
scope and location are defined.
1128
THOUGHTFUL SOLUTIONS. THRIVING COMMUNITIES. 30
City of Palm Desert | Park and Trailhead Engineering and Design | 2024-RFP-156 • Incorporate lead times and potential seasonal
constraints (e.g., best times for planting vs.
permitting windows).
IX. RISK MANAGEMENT AND MITIGATION
STRATEGIES
Potential Risks
• Site Constraints: Unknown utilities, geotechnical
challenges, or brownfield conditions.
• Schedule Delays: Weather, prolonged permitting
reviews, funding disbursement timelines.
• Community Concerns: Noise, traffic disruption, or
pushback on design features.
Mitigation Measures
• Early site investigations (soil borings, utility
locates), thorough stakeholder engagement, and
transparent cost estimates.
• Regular schedule reviews and prompt adjustment
if milestone dates shift.
• Maintain contingency allowances and backup
designs to address unexpected site conditions or
new stakeholder inputs.
Insurance and Liability
• Specify minimum professional liability, general
liability, and builder’s risk coverage for consultants
and contractors.
• Outline bonding requirements (if applicable) to
protect against contractor default or project noncompletion.
X. CHANGE MANAGEMENT PROTOCOLS
Scope Change Requests
• Document any request for additional features,
altered design parameters, or expanded site
boundaries in writing.
• Evaluate impacts on cost and schedule before
formally approving changes.
Budget and Timeline Adjustments
• Implement a formal process for re-estimating
tasks and updating the work plan if a scope
change is accepted.
• Secure client approval and, if needed, additional
funding before implementing major alterations.
XI. PROJECT CLOSEOUT AND POSTCOMPLETION ACTIVITIES
Final Inspections and Punch Lists
• Conduct comprehensive on-site reviews of
constructed elements: playground equipment
installation, surfacing, landscaping, and any smallstructure finishes. • Confirm that any deficiencies are remedied before
final acceptance.
Operations and Maintenance
• Provide as-built drawings, equipment manuals,
and warranties to the client for long-term upkeep.
• Offer training sessions for park maintenance
staff on new systems (e.g., irrigation, specialized
surfacing).
Lessons Learned
• Host a post-completion debrief with the project
team to document successes, challenges,
and recommendations for future small site or
playground projects.
• Summarize performance metrics (budget
adherence, schedule performance, stakeholder
satisfaction) for final reporting.
1129
THOUGHTFUL SOLUTIONS. THRIVING COMMUNITIES. 31
City of Palm Desert | Park and Trailhead Engineering and Design | 2024-RFP-156
LARGE SITE DEVELOPMENT
+ LINEAR TRAIL PROJECTS
WORK PLAN
The following work plan is building on the framework for small site developments or park and playground improvements, and reflects the greater complexity of large site development and linear trail projects. These projects generally carry a higher degree of public engagement and permitting requirements, because of their expansive nature or because of the levels of complexities embedded in reconciling all the use & programing, infrastructure, and specific site considerations. It establishes all the components and elements that we would tailor for each project in the custom work plan that we would develop around the specifics of each unique project.
It establishes clear processes—from data collection and community engagement through construction and closeout—while acknowledging that each individual project will bring its own unique conditions, stakeholders, and regulatory considerations.
Once a specific project is identified, the exact details of scoping, timelines, permitting requirements, and partner agencies will be refined to ensure that the work plan aligns with the project’s particular needs, goals, and local context.
We have included a graphic that demonstrated the chronological order in which these large-scope projects are developed and delivered. Our approach is to incorporate the notions and deliverables of the small-scope work plan into this larger, iterative framework.
1130
THOUGHTFUL SOLUTIONS. THRIVING COMMUNITIES. 32
City of Palm Desert | Park and Trailhead Engineering and Design | 2024-RFP-156 TI
E
RATIVE DESIGN PRO
C
ESS
1 PROJECT KICK-OFF
1 week
2 weeks
2 weeks
1 week per theme
2 weeks per theme
6 weeks
3 weeks + 2 weeks Staff review
1 week
3 weeks
2 weeks each
1 week per theme
2 weeks
2 weeks
Project Work Plan, Prep and
Kick-off Meeting
INITIAL PUBLIC OUTREACH &
ENGAGEMENT
• Stakeholder meetings
• Neighborhood meetings
• Open House Listening Session
• Project-Ambassadorship Program and Communications Plan
THEME CONCEPTUALIZATION
• Programming & Use
• Connectivity & Access
• Safety & Security
• Character & Identity
• Placemaking & Planning
• Sustainability & Resiliency
DESIGN ARTICULATION
• Design Detailing & 3D Visualizations
PUBLIC OUTREACH & ENGAGEMENT
• Stakeholder meetings
• Neighborhood meetings
• Open House Listening Session
IMPLEMENTATION STRATEGY
• Review by both the District and City
• Comment Resolution
DATA COLLECTION
• On-site Visual Inspection
• Utility and As-built Data Collection
• Design- and Planning-relevant Data Collection
• Final Base-map Development
• Site Analysis
• Conference with Staff on Findings
DEVELOPMENT OF DESIGN BRIEF
• Review by both the District and City
• Comment Resolution
DESIGN & RECOMMENDATIONS
• Review by both the District and City
• Comment Resolution
IMPLEMENTATION STRATEGY - DRAFT
• Design objectives, metrics, approach, and resolution
• Implementation recommendations
• Cost estimating and Phasing Strategies
• Review by both the District and City
• Comment Resolution
PROJECT CLOSE-OUT
• Final Assemblage of all project documents
• Final publication of final, approved report
2 3
4 5
6 7
8 9
10 ITERATIVE TESTING-STAKEHOLDERS
• Proofing of design ideas through public engagement
STAFF REVIEW & COMMENT
• District & City Staff
PRELIMINARY PLAN
FINAL PLAN DESIGN &
FINAL PLAN DESIGN &
• Final Plan Approvals
1131
THOUGHTFUL SOLUTIONS. THRIVING COMMUNITIES. 33
City of Palm Desert | Park and Trailhead Engineering and Design | 2024-RFP-156
PROJECT OVERVIEW AND OBJECTIVES
High-Level Description
• Summarize the nature of the large site or linear
trail project, including its intended benefits:
expanded recreational opportunities, improved
connectivity, environmental enhancements, or
master-plan alignments.
• Emphasize how the project’s scale (large park
phases or multi-mile trails) supports broader
community goals (e.g., economic development,
public health, equitable access).
Key Objectives
• State overarching objectives such as creating
signature public spaces, enhancing resiliency
and sustainability, and improving user safety and
comfort.
• Note alignment with municipal policies, parks
and recreation master plans, or comprehensive
plans—particularly important for major, multiphase endeavors.
SCOPE OF WORK AND DELIVERABLES
Project Scope
• Define the scope in phases, mirroring the
Foundation Data Collection, Conceptual Design,
Schematic Design, Design Development,
Biddable Documents Preparation, Bidding &
Award Assistance, and Construction Support
stages shown in the reference graphics.
• For Large Site Development, specify major
amenities (athletic fields, pavilions, parking,
erosion control) as well as ecological and
environmental considerations.
• For Linear Trail or Trailhead Projects, include trail widening or new trail alignment, underpasses,
bridge construction if needed, trailhead
development, amenities, and associated
landscaping.
Deliverables
• Data Collection & Analysis: Base maps,
geotechnical reports, utility assessments, and site
inventories.
• Design Milestone Packages:
• Conceptual Plans (overall layouts, initial cost
estimates),
• Schematic Design (refined site diagrams,
preliminary details for structures and trail
sections),
• Design Development (detailed plans, specs,
and updated cost estimates).
• Construction Documents (final drawings,
technical specifications, bidding documents).
• Reports & Estimates: Stormwater analysis,
erosion control strategies, engineering
calculations, cost estimates.
• Engagement Materials: Presentation boards,
3D visualizations, public meeting summaries,
and final reports.
• Approvals & Sign-Offs: Formal acceptance
by the client, city agencies, and any oversight
bodies at each design phase.
PROJECT SCHEDULE AND MILESTONES
Timeline Overview
• Use the general sequence suggested by the
graphics, with approximate durations for each
phase (e.g., 2–3 weeks for data collection, 4–6
weeks for conceptual design, etc.), adjusting once
site-specific factors are known.
• Acknowledge that schedule details (e.g., funding
cycles, permitting timelines) will be evaluated on a
case-by-case basis.
Major Milestones
• Project Kick-Off & Data Collection: Final basemap preparation, on-site inspections, stakeholder kickoff meeting.
• Initial Public Outreach & Engagement: Gather
community input, hold open houses, identify
priorities.
• Conceptual / Schematic Design: Develop design
alternatives, refine them based on feedback.
• Design Development: Prepare more detailed
layouts, cost estimates, and draft specifications.
• Biddable Documents Preparation: Finalize
construction drawings and technical specs.
• Bidding & Award Assistance: Issue RFPs/RFQs,
answer bidder questions, evaluate proposals.
• Construction Support: Site inspections, submittal
reviews, final punch list.
LARGE-SCOPE WORK PLAN
1132
THOUGHTFUL SOLUTIONS. THRIVING COMMUNITIES. 34
City of Palm Desert | Park and Trailhead Engineering and Design | 2024-RFP-156 • Project Closeout: As-built documentation, final
acceptance, lessons learned.
Phased Deadlines
• Identify if certain components (e.g., new athletic
fields, a major bridge, or a trailhead) must be
delivered first to meet grant requirements or
funding milestones.
• Include placeholders for potential additional
phases if new amenities or expansions are
introduced.
ROLES, RESPONSIBILITIES, AND PROJECT
TEAM
Key Stakeholders
• Client / Owner: City of Palm Desert
• Design & Engineering Team: Landscape
architects, civil engineers, structural engineers
(for bridges and pavilions), urban designers,
environmental consultants.
• Construction Team (once awarded): General
contractors, specialty subcontractors for athletic
fields, trail paving, irrigation, etc.
• Community Stakeholders: Neighborhood groups,
advocacy organizations, local businesses, and
possibly state or federal agencies if the project
intersects protected lands or waterways.
Reporting Hierarchy
• Establish a Project Manager on the consultant side
and a Client Representative on the agency’s side
for direct communication.
• Define contact persons for sub-consultants and
internal discipline leads (e.g., one for civil, one for landscape architecture).
• Specify a procedure for decision-making
(who signs off on design changes, budget
modifications, and schedule shifts).
BUDGET AND RESOURCE ALLOCATION
Budget Structure
• Organize costs by phase (e.g., Data Collection,
Conceptual Design, Schematic, Design
Development, Construction Documents,
Construction Support).
• Include contingencies for unknown conditions
typical of large sites or trail corridors (soil
remediation, hidden utilities, additional public
outreach).
Funding Sources & Billing
• Acknowledge the possibility of diverse funding
streams: municipal budgets, state/federal grants,
public-private partnerships.
• Outline billing rates, reimbursable expenses
(travel, printing, geotechnical testing), and
invoicing intervals.
Cost Control
• Perform cost checks at key design stages
(conceptual, schematic, design development) to
ensure alignment with project budgets.
• Institute a value engineering process if costs
exceed available funds.
COMMUNICATIONS AND STAKEHOLDER
ENGAGEMENT PLAN
Communication Protocols
• Conduct periodic coordination meetings (weekly or
biweekly) with the client and key team members.
• Use standardized documentation: meeting
minutes, status reports, design review memos.
Public Outreach & Engagement
• For Large Site Projects: Host charrettes and open
houses at conceptual and schematic stages to
gather broad community feedback.
• For Linear Trails or Trailheads: Engage
neighborhoods along the corridor, coordinating
with transportation groups, bike/ped advocacy
organizations, or environmental agencies.
• Incorporate iterative testing phases for design
ideas, adjusting based on stakeholder input.
Updates to Oversight Bodies
• Provide regular progress briefings to city councils,
park boards, or committees that grant funding.
• Develop a schedule of milestone presentations
(e.g., preliminary plan, final design) for formal
approvals.
QUALITY MANAGEMENT PLAN
QA/QC Processes
• Assign internal reviewers at key milestones (e.g.,
30%, 60%, 90% design documents) to confirm
technical accuracy and consistency.
• Use discipline-specific checklists (civil engineering, landscaping, structural) to maintain high-quality
deliverables.
1133
THOUGHTFUL SOLUTIONS. THRIVING COMMUNITIES. 35
City of Palm Desert | Park and Trailhead Engineering and Design | 2024-RFP-156 Review Checkpoints
• Incorporate staff reviews from the client and
any external agencies that must approve major
infrastructure elements (e.g., new bridges).
• Obtain sign-offs before moving to subsequent
phases, reducing rework or scope creep.
REGULATORY AND COMPLIANCE
REQUIREMENTS
Codes and Standards
• Anticipate compliance with city, state, and federal
guidelines: zoning, ADA, playground safety
standards, environmental regulations (e.g., Army
Corps of Engineers if wetlands are involved).
• For Trail or Trailhead Projects: address potential
State, Federal Highway Administration (FHWA) or
CalTrans standards if funded or managed through
transportation grants.
Permitting
• Identify required reviews: local building permits,
stormwater/water quality permits, encroachment
permits for roadway underpasses.
• Acknowledge that timelines for permit reviews
vary and could affect the overall schedule.
RISK MANAGEMENT AND MITIGATION
STRATEGIES
Potential Risk Factors
• Site Constraints: Floodplain presence, steep
slopes, environmental contamination, or sensitive
habitats.
• Weather & Seasonal Factors: Climatic conditions
in Palm Desert, which might delay earthwork or
facility installations.
• Community Sensitivities: Resistance to certain
amenities, concerns about traffic or parking, noise
from large sports fields.
Mitigation Measures
• Early engagement with regulatory agencies
and thorough site investigations (geotechnical,
environmental).
• Detailed scheduling with built-in weather
contingencies.
• Contingency budgets for unexpected scope
expansions or design modifications.
Insurance & Bonding
• Require general liability, professional liability, and performance/payment bonds from contractors.
• Specify coverage limits appropriate for large or
corridor-scale projects.
CHANGE MANAGEMENT PROTOCOLS
Change Orders & Scope Amendments
• Create a formal process for requesting scope
modifications, addressing the reason (e.g.,
new funding, unforeseen site conditions) and
associated cost/schedule impacts.
• Maintain a change log with approval signatures
from both the consultant’s project manager and
the client’s authorized representative.
Timeline/Budget Revisions
• Update baseline schedules and cost forecasts as
soon as scope changes are approved.
• Communicate adjustments to all stakeholders,
including sub-consultants and potential funding
agencies.
PROJECT CLOSEOUT AND POSTCOMPLETION ACTIVITIES
Final Inspections & Punch List
• Conduct comprehensive reviews of installed
amenities (athletic fields, pavilions, trail surfacing, bridge structures) and address any remaining
deficiencies.
• Ensure relevant life-safety features and code
compliance checks are completed prior to
opening the site or trail to the public.
Documentation & Handover
• Provide as-built drawings, operation/maintenance
manuals, product warranties, and recommended
maintenance schedules.
• Facilitate training for client staff on key systems
(e.g., irrigation, electrical equipment, specialized
athletic field maintenance).
Lessons Learned & Evaluation
• Compile a post-completion report evaluating
project performance (budget adherence, timeline
accuracy, stakeholder satisfaction).
• Document best practices and challenges to
improve processes for future large park or linear
trail projects.
1134
THOUGHTFUL SOLUTIONS. THRIVING COMMUNITIES. 36
City of Palm Desert | Park and Trailhead Engineering and Design | 2024-RFP-156 Quality Assurance
Interwest performs Quality Assurance/Quality Control of the plans and specifications at 30%, 60%, 90%, bidding, and prior to issuance of final Construction Documents. At each of the project progress levels, the design plans and specifications are first reviewed by the Engineer of Record (EOR) for Quality Assurance and then routed for Quality Control review by the CADD Manager, an Independent Professional Engineer, and a Construction/ CEI team member. Once the comments have been addressed, the plans are submitted to the firm’s Director of Engineering for final sign off before being released. This review specifically ensures that the plans make sense from a construction perspective and is intended to minimize potential problems in the field during construction.
The Interwest team also has extensive experience and knowledge in all applicable federal, state and local codes, laws and regulations.
Interwest is committed to quality for every task, deliverable, and service provided by the firm.
Interwest understands that fulfilling the needs and expectations of our clients is paramount to earning and retaining their confidence. As such, all Interwest projects are subject to stringent QA/QC processes to ensure a consistently high level of excellence. The Interwest Team is proactive with all projects and stands ready to commit the resources necessary for the success of each project.
The objective of our QA/QC program is to ensure that all deliverables conform to your scope and are void of errors and omissions. Our commitment is based on the philosophy that:
Quality is achieved by adequate planning, coordination, supervision, and technical direction; proper definition of the job requirements and procedures; understanding the scope of services; and the use of appropriately skilled personnel performing work functions carefully.
All quality control review comments are maintained in a quality assurance file. This network review is enhanced by weekly or bi-monthly full team meetings with the Project Manager.
Checklists and other guidelines will be outlined to not only ensure proper deliverables but to assist in professional development of staff. All project team members will be expected to perform certain tasks on the project and be responsible for fulfilling their responsibilities accurately and efficiently. Asking questions, training, and backchecking deliverables will be completed before deliverables are reviewed by the Independent Reviewer, all of which are part Quality Control (QC).
Producing a clear and accurate set of deliverables is
one aspect of our commitment to QA/QC. Another
aspect of the commitment to QA/QC involves
electronic files. The following QA/QC Standards
include, but are not limited to the following:
• Making sure the correct text size and font
are used in the Micro-station or Auto CAD
files,
• Entities are drawn correctly to comply with
the use of Geopak or Civil 3D,
• Design features are drawn on the
appropriate levels, and
• Date and drawing purpose is reflected on
each drawing.
Independent
Review
Review of
Comments
by Designer
Concurrence
Between
Designer &
Reviewer
Revision by
Designer
Confirmation
by
Reviewer Interwest’s
QA/QC
Process
1135
THOUGHTFUL SOLUTIONS. THRIVING COMMUNITIES. 37
City of Palm Desert | Park and Trailhead Engineering and Design | 2024-RFP-156 Communication
Communications is a crucial component to any project,
keeping clients and contractors coordinated, and
projects on time and within budget. Interwest keeps
direct contact with the client’s project manager and will provide project schedules and project status updates to keep the project flowing and the client well-informed.
Throughout each project, we will provide regular
progress reports and communicate with stakeholders
to ensure that the project is progressing according to
plan. One of the keys to the efficient and successful
flow of information is clear, effective communication.
Everyone involved must be aware of changes,
progress, and challenges. All participants must clearly understand the ultimate goal and objectives of the
project and have a shared commitment to achieving
them. We commit to working with you to determine
the best ways to communicate the right information to
the right people at the right time.
The key to avoiding most problems is maintaining open
lines of communication, both formal and informal. As
long as everyone on the project team, including the
client, engineer, sub-consultant, stakeholders, and
contractors, is in agreement, few real problems are
likely to develop. Regular team meetings will be held
during the project to discuss project issues and ways
to improve the quality of the design and streamline the production efforts.
Interwest will issue regular project status reports
either on a monthly or a bi-weekly basis (as preferred
by the City) to communicate project progress,
schedule adjustments, and any other issues that need
to be resolved.
Communication with the public will be a significant
factor in the success of any project. The better informed people are, the more likely they will be supportive of
the project. With a wealth experience providing Public
Involvement and Public Outreach services, Interwest’s
Project Manager, Scott Harrison, CPRP, will lead
efforts for projects under this contract with the City. 1136
THOUGHTFUL SOLUTIONS. THRIVING COMMUNITIES. 38
City of Palm Desert | Park and Trailhead Engineering and Design | 2024-RFP-156 Mitigating Potential Delays
Effective management of delays is crucial to ensure the project stays on schedule. Some of the strategies we
use to manage delays include the following:
PROACTIVE PLANNING
Detailed Project Schedule: Develop a comprehensive
project schedule with clear milestones and deadlines
for each phase. Regularly update the schedule to
reflect progress and any changes.
Risk Assessment: Conduct a thorough risk assessment
to identify potential sources of delays and develop
mitigation plans for each identified risk.
COMMUNICATION AND COORDINATION
Regular Meetings: Conduct regular progress
meetings with all stakeholders, including project
managers, contractors, utility companies, and local
authorities, to discuss progress, address issues, and
make timely decisions.
Clear Communication Channels: Establish clear
communication channels to ensure timely information
flow between all parties involved in the project.
CONTINGENCY PLANNING
Buffer Time: Include buffer time in the project schedule to accommodate unforeseen delays without impacting
the overall timeline.
Alternative Plans: Develop alternative plans for critical activities to ensure work can continue even if certain
tasks are delayed.
RESOURCE MANAGEMENT
Adequate Staffing: Ensure adequate staffing levels
to handle workloads and avoid delays due to resource
constraints.
Equipment Availability: Ensure that all necessary
equipment and materials are available on-site when
needed to prevent delays due to supply chain issues.
MONITORING AND REPORTING
Progress Tracking: Implement a robust system
for tracking project progress against the schedule.
Use project management software to monitor key
performance indicators (KPIs) and identify potential
delays early.
Regular Reporting: Provide regular progress reports
to stakeholders, highlighting any delays and the
actions being taken to address them.
ISSUE RESOLUTION
Timely Decision-Making: Empower project managers
to make timely decisions to resolve issues that could
cause delays.
Escalation Procedures: Establish clear escalation
procedures for resolving disputes or issues that cannot be resolved at the project level.
STAKEHOLDER ENGAGEMENT
Public Outreach: Engage with the community and
other stakeholders to keep them informed about the
project progress and any potential delays. Address their concerns promptly to maintain support for the project.
Coordination with Authorities: Work closely with local
authorities to obtain necessary permits and approvals
in a timely manner.
QUALITY CONTROL
Inspections and Audits: Conduct regular inspections
and audits to ensure work is being completed to the
required standards and specifications. Address any
quality issues promptly to avoid rework and delays.
1137
THOUGHTFUL SOLUTIONS. THRIVING COMMUNITIES. 39
City of Palm Desert | Park and Trailhead Engineering and Design | 2024-RFP-156 EXAMPLE SCOPE:
The following is an example of how we would structure
a project for a playground replacement addition of
new water feature, shade, or other scope element as
noted in the “Key Design Needs” matrix in the RFP to
arrive at pricing for this proposal. Once selected, the City and the Interwest Team will refine and tailor the
scope of work to the specific needs of the project and
the site location.
Parks
The initial phase will involve the demolition of the
existing amenities that will need to be replaced
(these could include play areas, fields, etc), ensuring the responsible disposal of all materials. Following
a comprehensive site assessment, the suitability
any existing locations that will be rehabilitated for
a new playground will be determined. Our team will
leverage our expertise to explore alternative locations if necessary, prioritizing optimal integration within the park’s existing landscape.
Central to all new restrooms and playground projects
is the implementation of a universally accessible play
environment. The design will prioritize access for
children of all abilities, integrating inclusive pathways, ramps, and play structures that adhere to current ADA
compliance standards. To ensure year-round usability,
the playscape will incorporate a shade plan utilizing a combination of shade sails, strategically placed trees, and potentially other creative elements like pergolas.
Prior to beginning the Construction Documents
phase, the Interwest Team will present the City with
a comprehensive design package. This package will
include two distinct design concepts, each crafted
to prioritize inclusivity, while offering a unique play experience. Each concept will showcase a variety
of play equipment specifically chosen to cater to a
wide range of ages and developmental abilities. The
design will prioritize fostering social interaction and imaginative play, transforming the space into a vibrant hub for childhood development and community
connection. Through the selection process, the City
will have the opportunity to provide valuable feedback
and collaboratively choose the concept that best aligns with their vision for the park.
Specific to trailhead design, this framework serves as
an initial proposal, and upon selection, will be refined and customized in collaboration with the City and the
Interwest team to meet the specific demands and
unique characteristics of the project site.
Trailheads
The initial phase of the project will focus on the
evaluation and potential modification of existing
infrastructure at the proposed trailhead location. This may include the removal of outdated facilities and
the responsible recycling or disposal of materials.
A thorough site analysis will be conducted to assess
the current conditions and determine the feasibility
of enhancing the existing trailhead or selecting a new
site altogether. Our team will employ our extensive
expertise to ensure the selected site optimally
integrates with the surrounding environment and
existing network of trails.
Key to the development of the trailhead is creating
a welcoming and functional entry point to the trails.
The design will incorporate essential amenities such
as parking, directional signage, and seating areas. It
will also feature sustainable practices such as native
landscaping and stormwater management systems to
minimize environmental impact.
Prior to advancing to the construction documents
phase, the Interwest Team will present the City with
a comprehensive design package. This package will
feature two innovative design concepts that focus on
accessibility, safety, and enhancing the user experience.
Each concept will propose solutions for effective
wayfinding, emergency access, and amenities tailored
to the needs of a diverse range of trail users, from casual walkers to seasoned hikers. The designs will aim to
encourage engagement with the natural environment,
promoting both educational and recreational uses of
the trailhead.
Standard Process
Through a collaborative review process, the City
will have the opportunity to provide feedback and
select the design that best aligns with their goals for enhancing community access to natural spaces and
promoting outdoor activities.
The following is a description of the proposed
improvements to be provided:
1. Survey of the entire park area to support both
the project for the playground renovation and
the future park master planning efforts.
1138
THOUGHTFUL SOLUTIONS. THRIVING COMMUNITIES. 40
City of Palm Desert | Park and Trailhead Engineering and Design | 2024-RFP-156
2. Perform utility investigation to support both
this project for the playground renovation and
the future park master planning efforts.
3. Perform geotechnical engineering evaluations
to support both this project for the playground
renovation and the future park master planning
efforts.
4. Create demolition plans for the existing
playground facilities.
5. Produce conceptual design of two (2)
playground alternatives, including evaluations
for potential relocation, for City Staff evaluation
and selection.
• Achieve a high level of inclusivity, ensuring
accessibility for children of all abilities.
• Provide ample shade throughout the play
area for year-round enjoyment.
• Maintain easy accessibility from the
existing parking lot, which will require an
analysis of all existing walkways to ensure
ADA-compliant access.
• Playground design shall comply with the
latest editions of ASTM 1487, ASTM1292,
ASTM F1951 and the CPSC Public
Playground Safety Handbook.
6. Design refinement for final City Staff approval.
7. Produce construction plans for the new
playground facilities and associated
improvements.
8. Prepare Opinion of Construction Estimate
9. Prepare bid documents.
10. Assist during bidding.
11. Provide construction contract administration
Specific tasks for the playground renovation’s survey,
schematic design, permitting, construction documents
and bidding services are as listed in each task, as
follows.
TASK 1 – PARK SITE SURVEYING SERVICES – To be
furnished by the City
Boundary Survey
• City will perform a field survey of the subject
property in order to prepare a map of boundary
and topographic survey. The survey will be
prepared in accordance with the Standards of
Practice requirements for Surveying and Mapping
in the State of California. All boundary corners
will be found or set and discrepancies (if any)
between field measured values and record values
will be noted. A survey report will be provided
that will include the legal description, flood zone
information for the subject property, and other
pertinent survey information. In addition, any
encumbrances or easements that may affect the
parcels will be graphically shown on the Map of
Boundary Survey.
Topographic Survey
• Determine the location of all above-ground
improvements within the parcel with horizontal
locations and vertical elevations being obtained
for such items as sidewalks, edge of pavement,
concrete curb, buildings, parking lot striping,
fences, driveways and visible above-ground
utilities.
• Visible above ground utilities refer to the visible
structures (e.g., manholes, valve boxes, inlets,
risers etc.) typically associated with storm
drainage, sanitary sewer, potable water, electric,
gas, telephone and cable television.
Tree Survey
• Existing trees within the site with a diameter at
breast height equal to or greater than two inches
will be located and tagged with an identification
number. The size and common name of each tree
will be identified via a unique symbol as shown on
the map of boundary and topographic survey. An
inventory matrix sheet will be created which will
include the tag number, identification, (scientific
and common name), canopy, spread, height and
condition of tree.
TASK 2 – GEOTECHNICAL ENGINEERING SERVICES
• Conduct four (4) Standard Penetration Test (SPT)
borings in general accordance with ASTM D-1586
specifications to a depth of 15-feet at a location
provided by the design team.
• Conduct two (2) usual type open-hole exfiltration
tests to a depth of 15-feet each to measure the
hydraulic conductivity of the existing soils at
specific test locations for site drainage evaluation
by others, and
• Conduct two (2) Double Ring Infiltrometer tests
(six-hour test duration or stabilization) to analyze
the drainage capabilities of the existing soils to
facilitate retention areas.
1139
THOUGHTFUL SOLUTIONS. THRIVING COMMUNITIES. 41
City of Palm Desert | Park and Trailhead Engineering and Design | 2024-RFP-156 TASK 3 - TYPE D UTILITY INVESTIGATION SCOPE
• Conduct utility records research to identify
existing utility owners/operators within the project
limits.
• Obtain available utility records, plans, maps, and
as-built drawings from City Staff, utility owners/
operators, and other sources like one-call centers,
county records, visual site inspections, etc.
• Compile all obtained utility records into a
comprehensive set of utility drawings/data for the
project area.
• Depict all utilities at Quality Level D (QL-D) based
solely on the existing utility records, with unknown
horizontal and vertical accuracy.
• No field locating or physical verification of utilities will be performed as part of QL-D.
• Identify discrepancies, missing information, or
utilities not depicted in the records.
• Provide recommendations for additional
investigation using higher quality levels (QL-A, B
or C) to resolve discrepancies or locate critical
TASK 4 – SCHEMATIC DESIGN ALTERNATIVES
• The design team will work closely with City Staff
(specifically those responsible for steering and
guiding the design and development decisions)
to develop two (2) schematic plan alternatives
that identify the size, location and metrics of
the components to be included in the design
solutions. The design team will develop the
designs under Staff direction.
• The design team will conduct a preliminary design
review of the draft schematic design package with
City Staff to solicit feedback and direction.
• The City’s Project Manager will provide a
consolidated list of client comments to be
incorporated into one final schematic design
document. The design team will review and
incorporate input received from the City as a
basis for developing the Final Schematic Design
Documents.
Final Schematic Design and Review Milestone
• The design team and any applicable subconsultants will further refine and develop the final selected schematic design document in
preparation for submission to the City for final
approval of the schematic design. The final
schematic design will be represented with design
documents that may include preliminary diagrams,
plans, and 3D imaging to illustrate overall vision,
character, and materials to further communicate
the vision for the project.
TASK 5 – CONSTRUCTION DRAWINGS AND
SPECIFICATIONS
The design team shall provide drawings at the 30%,
60%, 90% and 100% design milestones for the City to
review and comment at each critical milestone.
• The drawings will be prepared with industryaccepted guidelines for the production of construction drawings on 24”x36” sheets at
appropriate scales. This submission will include
the following technical drawings:
• G-Sheets (General)
– Cover, Index, Standard Abbreviations,
Project Map, Revision Log and General
Notes
• V-Sheets (Existing Conditions)
– Topographical Survey – Furnished by City
• D-Sheets (Demolition Work)
– Site Demolition Notes and Plans
– Tree and Palm Preservation Notes,
Schedules, and Plans
– Tree and Palm Disposition Notes and
Plans
• SP-Sheets (Site Work)
– Site Plans (Notes, Schedules, Design,
Materials, Dimensions)
• SD-Sheets (Site Details)
– Overall Site Sections
– Detailed Site Sections
– Paving and Edging Details
– Furnishing Details
– Enlargement Plans
– Specific Design Component Detailing
• C-Sheets (Civil Engineering)
– Drainage Notes
– Drainage Plans
– Grading Plans
1140
THOUGHTFUL SOLUTIONS. THRIVING COMMUNITIES. 42
City of Palm Desert | Park and Trailhead Engineering and Design | 2024-RFP-156 – Pavement Marking and Signage Plans (for
parking lot improvements only)
– Water and Sewer/Wastewater Plans (where
improvements are being provided for
drinking fountains, restrooms, etc)
• E-Sheets (Electrical Engineering)
– Lighting Plans
– Electrical Riser and Connection Detailing
and Sch
• L-Sheets (Landscape Planting)
– Landscape General Notes
– Tree and Palm Receptor Notes, Plans and
Schedules
– Proposed Planting Plans
– Typical Planting Details
• IR-Sheets (Irrigation Design)
– Irrigation Notes
– Irrigation Plans
– Irrigation Typical Details
• Cost Estimate: The design team will prepare a
cost estimate identifying elements, quantities
breakdown and opinion of market costs for
each, reflecting unit costs for components at
the time that it is drafted. The cost estimate
will include a 20% contingency add-on.
• Quality Assurance/Quality Control peer-review
and constructability review at each level of
development.
TASK 6 – PERMITTING
The design team shall prepare permit applications
for the improvements proposed in this work order
for submittal to the permitting agencies at the same
time as the 90% design submittal. Permit fees will be
paid by the City. The design team will submit permits
to and respond to requests for information (RFIs) from
the permitting agencies associated with the necessary
permits.
TASK 7 – BIDDING SERVICES
• The design team shall revise the 100% design
documents and coordinate with the CITY
Purchasing Division to prepare the Bid Set
bidding documents.
• The City shall be responsible for setting the
bid opening date, advertisement of the bid,
producing and distributing bid documents, and
scheduling the pre-bid meeting.
• The design team will deliver electronic copies of
the Contract Documents for the City to post on
the City’s web site. The design team will attend
the pre-bid meeting with the City.
• The design team shall prepare responses to
written questions from registered holders of
bidding documents during the bid phase to be
issued by the City via addenda and will furnish
to the City’s purchasing department and project
manager for posting on the City’s web site.
• After bids are received, the City will prepare bid
tabulation and the design team will assist the City
in determining the lowest, responsive, responsible
bidder and make a recommendation to
TASK 8 – CONSTRUCTION ADMINISTRATION
• Attend the Pre-Construction Meeting
• The design team will attend and participate in
one (1) pre-construction meeting with City Staff
and contractor/sub-contractors, and shall assist
the City with the agenda preparation, meeting
minutes preparation and distribution.
• Construction Site Observations
• Provide up to 40 hours of construction
observations or as needed to issue a final
Certification for the project.
• Review of Drawings, As-Builts, and
Construction-Related Documents
• The design team will maintain RFI and shop
drawing log(s).
• The design team will issue interpretations and
clarifications (RFIs) of the Contract Documents
and evaluate requested deviations from the
approved design or specifications.
• The design team will review and process shop
drawings, samples and other data which the
Contractor is required to submit.
• Substantial Completion and Final WalkThrough: The design team will participate in one (1) Substantial Completion and one (1)
Final Inspection site walk through with the
Contractor and Staff.
1141
THOUGHTFUL SOLUTIONS. THRIVING COMMUNITIES. 43
City of Palm Desert | Park and Trailhead Engineering and Design | 2024-RFP-156 • The design team will contribute to the City’s
punch list of the findings and comments
issued at the Substantial Completion and Final
Inspection walk-through(s).
• The design team will conduct final reviews of
as-builts and record drawings as prepared and
submitted by the contractor/sub-contractor.
This is limited to two (2) reviews for each
type of as-built. Additional as-built reviews
beyond the number identified may require an
additional fees agreement.
• The design team will review monthly payment
applications, (a total of 10) in conformance
with the Contract Documents submitted
in a format acceptable to the City. The
design team will verify the quantities as
represented on the pay request and make
recommendations to the City to proceed with
the payment as requested or as modified
based on consultant review.
1142
Ch a n ge s to Ag ree m ent
1143
THOUGHTFUL SOLUTIONS. THRIVING COMMUNITIES. 45
City of Palm Desert | Park and Trailhead Engineering and Design | 2024-RFP-156 Changes to Agreement
Interwest respectfully requests the following modifications to the City’s standard professional services agreement indicated in red below:
3.2.11.2 Other Provisions or Requirements.
(C) Except with respect to Workers’ Compensation Insurance, Primary/Non-Contributing.
Coverage provided by Consultant shall be primary and any insurance or self-insurance procured or maintained by City shall not be required to contribute with it. The limits of insurance required herein may be satisfied by a combination of primary and umbrella or excess insurance. Any umbrella or excess insurance shall contain or be endorsed to contain a provision that such coverage shall also apply on a primary and non-contributory basis for the benefit of City before the City’s own insurance or self-insurance shall be called upon to protect it as a named insured.
(H) Requirements Not Limiting. Requirements of specific coverage features or limits contained in this Section are not intended as a limitation on coverage, limits or other requirements, or a waiver of any coverage normally provided by any insurance. Specific reference to a given coverage feature is for purposes of clarification only as it pertains to a given issue and is not intended by any party or insured to be all inclusive, or to the exclusion of other coverage, or a waiver of any type. If the Consultant maintains higher limits than the minimums shown above, the City requires and shall be entitled to coverage for the higher limits maintained by the Consultant. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City.
Note: We have insurance to cover all of our business; we allocate that by contract. You may receive the benefit of higher limits or not, depending on the number and nature of claims filed.
3.6.3.3 Right to Use. City shall not be limited in any way in its use or reuse of the Documents and Data or any part of them at any time for purposes of this Project or another project, provided that any such use not within the purposes intended by this Agreement or on a project other than this Project without employing the services of Consultant shall be at City’s sole risk. If City uses or reuses the Documents & Data on any project other than this Project, it shall remove the Consultant’s seal from the Documents & Data and indemnify and hold harmless Consultant and its officers, directors, agents, and employees from claims arising out of the negligent use or re-use of the Documents & Data on such other project. Consultant shall be responsible and liable for its Documents & Data, pursuant to the terms of this Agreement, only with respect to the condition of the Documents & Data at the time they are provided to the City upon completion, suspension, abandonment, or termination.
Consultant shall not be responsible or liable for any revisions to the Documents & Data made by any party other than Consultant, a party for whom the Consultant is legally responsible or liable, or anyone approved by the Consultant. For the avoidance of doubt, nothing in this Agreement shall be understood to grant City rights to pre-existing intellectual property of Consultant, including Consultant software and licensed software, or to any improvements thereto.
3.6.3.4 Indemnification – Documents and Data. Consultant shall defend, indemnify and hold the City, its directors, officials, officers, employees, volunteers, agents and representatives free and harmless, pursuant to the indemnification provisions of this Agreement, for any alleged infringement of any patent, copyright, trade secret, trade name, trademark, or any other proprietary right of any person or entity in consequence of the use on the Project by City of the Documents & Data, including any method, process, product, or concept specified or depicted. City represents and warrants that it has sufficient rights in any Documents & Data provided by it, or on its behalf, to Consultant for Consultant to perform its obligations under this Agreement and City hereby grants Consultant a fully paid up, temporary and non-transferrable license reproduce, create derivative works 1144
THOUGHTFUL SOLUTIONS. THRIVING COMMUNITIES. 46
City of Palm Desert | Park and Trailhead Engineering and Design | 2024-RFP-156 of and otherwise use such Documents and Data solely as necessary for Consultant and its subcontractors, if any, to perform services pursuant to this Agreement.
3.6.3.6 Confidential Information. The City shall refrain from releasing Consultant’s proprietary information (“Proprietary Information”) unless the City’s legal counsel determines that the release of the Proprietary Information is required by the California Public Records Act or other applicable state or federal law, or order of a court of competent jurisdiction, in which case the City shall notify Consultant of its intention to release Proprietary Information. Consultant shall have five (5) working days after receipt of the release notice to give City written notice of Consultant’s objection to the City’s release of Proprietary Information. Consultant shall indemnify, defend, and hold harmless the City, and its officers, directors, employees, agents, volunteers and representatives from and against all liability, loss, cost or expense (including attorney’s fees) arising out of a legal action brought to compel the release of Proprietary Information. City shall not release the Proprietary Information after receipt of an objection notice unless either: (1) Consultant fails to fully indemnify, defend (with City’s choice of legal counsel from Consultant’s insurance carrier’s panel counsel), and hold City harmless from any legal action brought to compel such release; and/or (2) a final and non-appealable order by a court of competent jurisdiction requires that City release such information.
3.6.6 Indemnification.
3.6.6.1 To the fullest extent permitted by law, Consultant shall defend (with counsel of City’s choosing and selected from Consultant’s insurance carrier’s panel counsel), indemnify and hold the City, its officials, officers, employees, volunteers, agents, and representatives free and harmless from any and all thirdparty claims, demands, causes of action, costs, expenses, liability, loss, damage or injury of any kind, in law or equity, to property or persons, including wrongful death, in any manner to the extent arising out of, pertaining to, or incident to any intentionally wrongful or negligent acts, errors or omissions, or willful misconduct of Consultant, its officials, officers, employees, subconsultants or agents in connection with the performance of the Consultant’s Services, the Project or this Agreement, including without limitation the payment of all expert witness fees, attorney’s fees and other related costs and expenses except such loss or damage caused by the sole or active negligence or willful misconduct of the City. Consultant’s obligation to indemnify shall survive expiration or termination of this Agreement and shall not be restricted to insurance proceeds, if any, received by Consultant, the City, its officials, officers, employees, agents, volunteers, or representatives. Notwithstanding any provision of law to the contrary, Consultant shall have the right to control the defense and settlement of any action for which indemnification is sought, provided that it shall not enter into any settlement that requires an admission of wrongdoing by any indemnitees without that indemnitees’ approval. Consultant’s obligations under this Agreement are contingent upon timely receipt of notice of the claim for which indemnification is sought, such that defense of the claim is not prejudiced, and the reasonable assistance of the indemnitees in connection with the defense of the claim.
3.6.6.2 If Consultant’s obligation to defend, indemnify, and/or hold harmless arises out of Consultant’s performance as a “design professional” (as that term is defined under Civil Code section 2782.8), then, and only to the extent required by Civil Code section 2782.8, which is fully incorporated herein, Consultant’s indemnification obligation shall be limited to claims that to the extent that they arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant, and, upon agreement of parties or Consultant obtaining a final adjudication by a court of competent jurisdiction, Consultant’s liability for such claim, including the cost to defend, shall not exceed the Consultant’s proportionate percentage of fault.
3.6.12 Assignment; Subcontracting. Consultant shall not assign, sublet, or transfer this Agreement or any rights under or interest in this Agreement without the written consent of the City, which may be withheld for any reason which consent shall not be unreasonably delayed or withheld. Any attempt to so assign or so transfer without such consent shall be void and without legal effect and shall constitute grounds for termination. 1145
THOUGHTFUL SOLUTIONS. THRIVING COMMUNITIES. 47
City of Palm Desert | Park and Trailhead Engineering and Design | 2024-RFP-156 Consultant shall not subcontract any portion of the Services required by this Agreement, except as expressly stated herein, without prior written approval of City. Subcontracts, if any, shall contain a provision making them subject to all provisions stipulated in this Agreement.
END OF EXCEPTIONS
1146
CIT Y OF
PALM DESERT
Park and Trailhead Engineering and Design
2024-RFP-156
MAIN PROPOSAL CONTACT:
JULIETTE RYAN
Account Manager
562.723.9969
[email protected]
March 11, 2025 | 5:00 PM PST
www.interwestgrp.com
FEE PROPOSAL
1147
THOUGHTFUL SOLUTIONS. THRIVING COMMUNITIES. 2
City of Palm Desert | Park and Trailhead Engineering and Design | 2024-RFP-156 Schedule & Fee
The following are the anticipated schedule and fees for the following parks, based on the statements of scope included in the RFQ:
• University Park: Playground Replacement
• Washington Charter: Playground Replacement
• Freedom Park: Playground Replacement
• Ironwood Park: Shade Structure and Water Feature
These are provided for informational purposes until such time that a more specific scope is tailored for each project, following the public engagement phases:
Task 1: Park Site Surveying Services
Task 2: Geotechnical Engineering Services
Task 3: Type D Utility Investigation Scope
Task 4: Schematic Design Alternatives
Task 5: Construction Drawings & Specifications
Task 6: Permitting
Task 7: Bidding Services
Task 8: Construction Administration
PROJECTED SCHEDULE
PROJECTED FEES
Task 1: Park Site Surveying Services
Task 2: Geotechnical Engineering Services
Task 3: Type D Utility Investigation Scope
Task 4: Schematic Design Alternatives
Task 5: Construction Drawings & Specifications
Task 6: Permitting
Task 7: Bidding Services
Task 8: Construction Administration
To be furnished by the City
25 working days
15 working days
35 working days + Public Engagement
60 working days
20 working days
30 working days
270 working days (based on recent experience
with manufacturer lead times and supply chains
$ -
$ 9,500.00
$ 6,500.00
$ 14,600.00
$ 36,500.00
$ 4,200.00
$ 2,100.00
$ 25,800.00
$ 99,200.00
........
........
........
........
........
........
........
........
.....................................
.....................................
.....................................
.....................................
.....................................
.....................................
.....................................
.....................................
Total
1148
THOUGHTFUL SOLUTIONS. THRIVING COMMUNITIES. 3
City of Palm Desert | Park and Trailhead Engineering and Design | 2024-RFP-156 Schedule & Fee
The following are the anticipated schedule and fees for the following parks, based on the statements of scope included in the RFQ:
• Hovley Soccer Park: Playground and Fields Replacement, Lighting, Irrigation & Landscaping • Homme Adams Park: Disk Golf Course, Parking, Shade Structure, Pre-fab Restroom, Furnishings, landscaping
• Randall Henderson Trailhead: Parking, Shade Structure, Pre-fab Restroom, Furnishings, landscaping These are provided for informational purposes until such time that a more specific scope is tailored for each project, following the public engagement phases. Fees for these projects take into account costs to cover CEQA permitting, where applicable.
Task 1: Park Site Surveying Services
Task 2: Geotechnical Engineering Services
Task 3: Type D Utility Investigation Scope
Task 4: Concept & Schematic Design Alt
Task 5: Construction Drawings & Specs
Task 6: Permitting
Task 7: Bidding Services
Task 8: Construction Administration
To be furnished by the City
25 working days
15 working days
65 working days + Public Engagement + CEQA
120 working days
30 working days
30 working days
360 working days
........
........
........
........
........
........
........
........
PROJECTED SCHEDULE
PROJECTED FEES
Task 1: Park Site Surveying Services
Task 2: Geotechnical Engineering Services
Task 3: Type D Utility Investigation Scope
Task 4: Concept & Schematic Design Alternatives
Task 5: Construction Drawings & Specifications
Task 6: Permitting
Task 7: Bidding Services
Task 8: Construction Administration
$ -
$ 12,500.00
$ 6,500.00
$ 31,000.00
$ 65,500.00
$ 7,500.00
$ 2,100.00
$ 50,500.00
$175,600.00
.....................................
.....................................
.....................................
.....................................
.....................................
.....................................
.....................................
.....................................
Total
1149
THOUGHTFUL SOLUTIONS. THRIVING COMMUNITIES. 4
City of Palm Desert | Park and Trailhead Engineering and Design | 2024-RFP-156 Hourly Rate Schedule
Effective January 1, 2025
Beginning on the 1st anniversary of the Effective Date of the Agreement and annually thereafter, the hourly rates listed below shall be automatically increased based upon the annual increase in the Department of Labor, Bureau of Labor Statistics or successor thereof, Consumer Price Index (United States City Average, All Items (CPI-U), Not Seasonally adjusted, All Urban Consumers, referred to herein as the “CPI”). Such increase shall not exceed 4% per annum. The increase will become effective upon publication of the applicable CPI data. If the index decreases, the rates listed shall remain unchanged.
Classification Hourly Billing Rate
Engineering
Principal in Charge...................................................................................................................... $265 Principal Engineer ...................................................................................................................... $240 City Surveyor .............................................................................................................................. $230 City Engineer ............................................................................................................................. $235 Project Manager ......................................................................................................................... $220 Senior Traffic Engineer ............................................................................................................... $210 Traffic Engineer III ...................................................................................................................... $200 Traffic Engineer II ....................................................................................................................... $190 Traffic Engineer I ........................................................................................................................ $180 Traffic Engineering Associate II .................................................................................................. $165 Traffic Engineering Associate I ................................................................................................... $155 Transportation Engineer ............................................................................................................. $220 Supervising Engineer ................................................................................................................. $215 Senior Engineer .......................................................................................................................... $210 Licensed Land Surveyor ............................................................................................................. $200 Engineering Associate III ........................................................................................................... $165 Engineering Associate II ............................................................................................................ $155 Engineering Associate I ............................................................................................................. $145 Survey Technician ....................................................................................................................... $135 Senior Engineering Technician ................................................................................................... $135 Engineering Technician III .......................................................................................................... $135 Engineering Technician II ............................................................................................................ $120 Engineering Technician I ............................................................................................................ $110 Student Trainee ........................................................................................................................... $ 55 Grading Plans Examiner ............................................................................................................. $170 Building Safety Services
Certified Building Official ........................................................................................................... $170 Deputy Building Official................................................................................................................ 160 Licensed Plan Review Engineer (structural, civil, electrical, mechanical) / Architect .................. $165 Supervising Structural Engineer ................................................................................................. $210 Senior Structural Engineer ......................................................................................................... $195 Senior Plans Examiner ................................................................................................................ $150 1150
THOUGHTFUL SOLUTIONS. THRIVING COMMUNITIES. 5
City of Palm Desert | Park and Trailhead Engineering and Design | 2024-RFP-156 CASp .......................................................................................................................................... $145 Inspector III ................................................................................................................................ $120 Inspector II ................................................................................................................................. $110 Inspector I .................................................................................................................................. $100 Permit Technician ......................................................................................................................... $85 Fire Protection Engineer ............................................................................................................ $170 Senior Fire Plans Examiner ......................................................................................................... $140 Fire Plans Examiner / Fire Inspector ........................................................................................... $130 ICC Building Plans Examiner ...................................................................................................... $130 Senior Code Enforcement Officer............................................................................................... $145 Code Enforcement Officer ........................................................................................................ $135 Trainee ......................................................................................................................................... $75 Construction Management
Construction Manager ................................................................................................................ $190 Assistant Construction Manager................................................................................................. $170 Supervising Public Works Observer ........................................................................................... $185 Senior Public Works Observer ................................................................................................... $180 Public Works Observer III ........................................................................................................... $165 Public Works Observer II ............................................................................................................ $150 Public Works Observer I ............................................................................................................. $135 Real Estate
Supervising Corporate Broker .................................................................................................... $270 Senior Project Manager ............................................................................................................. $210 Project Manager ......................................................................................................................... $190 Senior Acquisition / Relocation Agent ....................................................................................... $145 Acquisition / Relocation Agent .................................................................................................. $130 ROW Technician ......................................................................................................................... $120 ROW Coordinator ...................................................................................................................... $105 Administrative Support ................................................................................................................ $80 Landscape Design Review Services
Project Manager ......................................................................................................................... $189 Senior Landscape Design Reviewer ........................................................................................... $175 Landscape Design Reviewer ...................................................................................................... $160 Landscape Maintenance Inspector ............................................................................................ $135 Landscape Field Supervisor ....................................................................................................... $135 Planning Services
Community Development Director ............................................................................................ $230 Planning Manager ...................................................................................................................... $210 Project Manager ......................................................................................................................... $210 Principal Planner ......................................................................................................................... $190 Senior Planner ............................................................................................................................ $175 Associate Planner ...................................................................................................................... $140 Assistant Planner......................................................................................................................... $115 1151
THOUGHTFUL SOLUTIONS. THRIVING COMMUNITIES. 6
City of Palm Desert | Park and Trailhead Engineering and Design | 2024-RFP-156 Planning Technician ...................................................................................................................... $95 Environmental Services
CEQA/NEPA Project Manager.................................................................................................... $225 CEQA/NEPA Principal Planner.................................................................................................... $215 CEQA/NEPA Senior Planner ....................................................................................................... $195 CEQA/NEPA Associate Planner .................................................................................................. $160 CEQA/NEPA Assistant Planner ................................................................................................... $130 CEQA/NEPA Planning Tech ........................................................................................................ $110 Administrative
Grant Manager ........................................................................................................................... $170 Grant Writer ............................................................................................................................... $160 Management Analyst II .............................................................................................................. $130 Management Analyst I ............................................................................................................... $120 Senior Administrative ................................................................................................................. $120 Administrative III ........................................................................................................................ $100 Administrative II ........................................................................................................................... $95 Administrative I ............................................................................................................................ $80 Miscellaneous
Work Outside Standard Hours – Services provided in excess of 8 hours per day, outside regular business hours, nights, weekends and holidays will be invoiced at 150% of the above standard rates.
Prevailing Wages – Where work is required under the CA Labor Code for prevailing wages per jurisdiction, there will be a supplemental charge per hour to the above rates per applicable job classification, established at the time of commencement of work and adjusted from time to time in accordance with future wage determinations pursuant to the labor rates as determined by the CA Department of Industrial Relations.
Mileage & Tolls – For inspection staff reporting to the job site from out of town, mileage will be reimbursed to and from the employee’s reporting location, including their home location if not reporting to a company office, at the effective standard federal rate established at time of service. Tolls will be billed with no markup. 1152
CIT Y OF
PALM DESERT
Park and Trailhead Engineering and Design
2024-RFP-156
MAIN PROPOSAL CONTACT:
JULIETTE RYAN
Account Manager
562.723.9969
[email protected]
March 11, 2025 | 5:00 PM PST
www.interwestgrp.com
Project Team Resumes
1153
Bill is an experienced Project Manager who will
and oversee the quality of services provided.
Bill has over 36 years of diversified experience
serving in roles such as Project Manager, Public
Works Director, and Assistant City Manager. His
extensive experience in working in and with
municipal agencies provides him with the skills
and sensitivity to complete projects on time and
within budget.
Areas of Expertise
FHWA Project Management
FEMA Emergency Management – Certified
PMP Methodology
Erosion and Sediment Control
SWPPP & OSHA
Workplace Sensitivity
Management Academy – Trained
Project Experience
Project Manager
Lake Dalwigk Park
Vallejo, CA
2024
This Project provides for the improvement
and beautification of Lake Dalwigk Park
and enhanced community connections
from the surrounding neighborhoods into
the park. Specific elements include 3.8
acres of drought tolerant landscaping;
replacement of broken concrete pedestrian
path including grading for ADA access;
adding prefabricated restrooms and
connecting to existing utilities; extensive
pathway and park lighting utilizing solar
and/or low voltage LED lights; a pathway to
Curtola Park and Ride facility; pedestrian
bridge restoration; and installation of picnic
tables, trash cans, dog waste stations, shade
structures, drinking fountains, and two
monument signs.
Project Manager / Construction Manager
Enchanted Hills Park
Perris, CA
2019 – 2022
The $10.5 million, 22-acre park project
featured active play elements like
playgrounds, splash play, a skate spot,
zip lines, a BMX track, and basketball
courts. Additional features included trails,
shaded seating, picnic areas, a large lawn,
stormwater features, native gardens, and
low-water irrigation for sustainability.
The project won the 2022 CPRS Award of
Excellence in Design—Park Planning and
APWA Midsize Park of the Year.
Project Manager
Holbrook Palmer Park
Atherton, CA
2023 – Present
Project includes the replacement of
playground and restroom facilities for
a 22-acre municipally-owned park.
Services provided include public outreach,
construction management, construction
inspection, and park design.
Project Manager
Arlington and Centennial Ball Field Parks
Vacaville, CA
2023
Bill led the team providing construction
management and inspection services for
the installation of 12 Musco Baseball Field
Lights, including conduits, wires, lighting
control panels, and cabinets.
Project Manager
2024 Street R&R Project
Elk Grove, CA
2024
The City of Elk Grove has 251,050 SF
of three-inch and 5,007 SF of asphalt
removal and replacement at 501 locations
throughout the City. Bill led the team
providing construction management and
inspection services as well as materials
testing services.
Professional-in-Charge
Downtown Traffic and Pedestrian
Improvements
Hanford, CA
2023 – Present
Managing a multi-faceted $4.4 million
downtown revitalization and safety
improvement project that includes
traffic signal optimization, road diet
implementation, streetscape design
integration, and a roundabout design.
Services include traffic engineering, CEQA
compliance, civil engineering, construction
administration, electrical engineering,
feasibility analysis, irrigation design,
landscape architecture, public outreach, and
streetscape planning, analysis, and design.
Bill Evans
Professional-in-Charge
36 Years of Experience 4 Years with the Firm
1154
Scott Harrison has 14 years of diversified
experience as a Project Manager on a municipal
level managing construction projects. He holds
numerous certifications, particularly in the area
of municipal parks and recreation facilities.
His expertise encompasses the development,
construction, infrastructure replacement, and
design management, along with managing
municipal capital improvement programs. He
has often been responsible for the organization,
developing standards for staff, scheduling, and
implementation of various construction projects
and programs.
Education
BS, Human Performance
Florida Gulf Coast University
Licenses & Certifications
National Recreation and Park Association
Certified Parks and Recreation Professional, CPRP
Federal Emergency Management Agency
(FEMA)
IS100, IS200, IS700, IS800, G300, and G400
Certifications
Project Experience
Construction Manager
Fair Oaks/LLoyden Drive Pedestrian
Improvement Project
Town of Atherton, CA
08/2024– 11/2024
Construction Manager for the installation
of a raised crosswalk with solar powered
RRFB’s, bioretention bioswale, overflow
parkway drains, landscaping/irrigation
improvements, sidewalk, curb and gutter,
and signing and stripping. Project cost -
$500K.
Construction Manager
23/24 Pavement Management Project
04/2024 – 8/2024
This project consisted of mill and fill, overlay,
and slurry seal done in three separate
projects by three different contractors.
There was a lot of coordination between
contractors and scheduling of work to be
completed while keeping the public notified
in advance. Project cost - $1.5M.
Project/Construction Manager
City of Vallejo, CA
10/2022 – 1/2025
Lake Dalwigk Park Improvement Project
Project Manager/Construction Manager for
the design and construction of a $4.7M park
improvement project funded by a Clean
California Grant. This project consisted of a
restroom building, asphalt trails with lighted
bollards, reconstruction of the playground
area, local artist coordination of monuments
and mosaic insets, landscape and irrigation,
decorative thermoplastic crosswalks, a mini
roundabout, and signing and stripping with
traffic logic speed cushions and tuff curbs.
Project/Construction Manager
City of Canyon Lake, CA
09/2023 – 07/2025
HSIP Cycle 11 Safety Improvement Project
Project Manager/Construction Manager for
the design and construction of a 1.6M HSIP
Safety corridor project. The projects PS&E are
currently going through review by the DOT
for authorization to bid. This project consists
of Caltrans 60MS concrete median barrier
walls, median street lighting, traffic signal
improvements for pedestrians, signing and
stripping, and protected left turns to help
with congestion at a main intersection.
Assistant Director of Parks and
Recreation
City of Parkland, FL
2021 - 2023
Directed, planned, implemented, and
provided overall supervision of Parks and
Recreation Operations. He developed scopes
of services for various RFP, RFQ, and ITB
competitive bids. He reviewed plans and
specifications for proposed construction
projects and supervised construction
activities; scheduled pre-construction and
weekly project update meetings, monitored
status of work, and inspected completed
work to ensure compliance to plans. Scott
would prepare and present agenda and
action items to City commission during
strategic planning sessions and public
meetings. Scott served as the Logistics
Section Chief in times of Emergency
Operations.
Parks and Recreation Facility Coordinator
City of Cooper City, FL
2016 - 2019
Coordinated and organized staff schedules,
rentals, and facility operations of a
Community Center and Pool and Tennis
Center. He administered the planning,
coordination and supervision of department
park projects and facility renovations.
Oversaw curriculum, hiring, and training of
staff. Served as the Logistics Section Chief in
times of Emergency Operations.
Crew Leader – Special Events
Town of Davie, FL
2014 - 2016
Implemented, organized, and supervised
contracted programs, events, and facility
operations at Bergeron Rodeo Grounds.
Managed budgets, preparations, and
coordination of large-scale special events
lasting three days and consisting of 30,000
in attendance.
Recreation Leader II
Town of Surfside
2012 - 2014
Organized summer camp registration
process, staff schedules, field trips and
payroll. Developed and implemented
contracted programs for community
members of all ages. Scott hired, trained,
and supervised eleven part time staff.
Scott Harrison, CPRP
Project Manager
13 Years of Experience 2 Years with the Firm
1155
Emily has over 20 years of experience in local
government and public utilities. She has worked
in both the public and private sectors in land
development as a project manager for capital
improvement design engineering, managing
engineering projects for plan check and inspection,
and has worked on multiple capital campaigns
for government affairs within the public utility
space. She is experienced in developing effective
and engaging public outreach campaigns, grant
writing, process development, and creating
policy. Emily has worked with the City in a project
management role on both the North Palm Desert
Community Park and Lupine Plaza projects.
Education
MA Public Administration, Concentration in
Business Administration Fundamentals and
Advanced Technologies
California State University - San Bernardino, CA
BS Civil Engineering, Emphasis in
Transportation Design and Geographical
Information Systems (GIS)
California State Polytechnic University, Pomona, CA
Project Experience
Project Manager
Antelope Creek Park
Woodlake, CA
2024 – Present
17-acre park with multi-functional
amenities, on-site utility infrastructure
design and construction, and off-site utility
and street improvement upgrades. Manage
project scope, budgeting, scheduling,
permitting, design coordination and staff
augmentation for project in both design and
bidding/construction phases. Park amenities
include a skate plaza, BMX pump track,
one-mile recreation trail, and multi-purpose
fields (baseball & softball), basketball and
volleyball courts, and concession stands.
The park also includes picnic and workout
areas, a dog park, and drought tolerant
demonstration gardens with local art.
Project Manager
East Naranjo Beautification Project
Woodlake, CA
2024 – Present
Project uses Clean California Local Grant
monies to construct a mid-block crosswalk,
Class I bike path, ADA accessibility upgrades,
street improvements, utility upgrades, and
stormwater infrastructure along SR-216.
Project includes decorative paving and
parking area improvements at the Woodlake
Botanical Garden, removal of two parking
lots, reconfiguration of the intersection of
two storm drain facilities, installation of park
features, and drought tolerant landscaping
at the Woodlake City Park. Manage project
scope, budgeting, scheduling, permitting,
design coordination and staff augmentation
for project in both design and bidding/
construction phases.
Project Manager, Engineering
Downtown Improvements Project
Hanford, CA
2024 – Present
Project to complete downtown traffic and
pedestrian improvements, including a
roundabout at 7th Street and Douty Street,
intersection improvements to 7th and
Irwin, mid-block crossings along Douty
Street, upgraded ADA ramps and pedestrian
facilities, enhanced sidewalks, lighting,
landscape and irrigation, and drainage
improvements along the project corridor.
Provide engineering oversight in due
diligence and project design.
Assistant Resident Engineer
San Sevaine Trail Improvements
Fontana & Rancho Cucamonga CA
2024 - Present
Project to construct regional trail
improvements within the cities of Fontana
and Rancho Cucamonga, connecting the
Pacific Electric Trail to the Etiwanda Creek
and San Sevaine Channels. Responsible
for reporting state and federal construction
requirements and tracking construction
progress, weekly construction and inspection
reporting, and budgeting.
Engineering Lead
Capital Improvement Program
Palm Springs, CA
2018 – 2019
Updated and implemented the City’s
Capital Improvement Program. Adopted
budgets, funding sources, multi-year
planning, and financing, and developed
an impact fee assessment. Responsibilities
included revisions and updates to the Active
Transportation Plan (ATP) , Local Highway
Safety Improvement Program (HSIP), and
slurry seal projects.
Emily Stadnik
Assistant Project Manager
22 Years of Experience 2 Years with the Firm
1156
With 24 years of experience, Gianno leads
the Landscape Department in creative design
strategies for urban environments with specialties
including urban design, contextual analysis, and
branding. He has experience in coordinating
design implementation within built-out urban
environments, public outreach, and report
preparation, where he will lead the effort in the
creation of a graphically-rich, easily legible report.
His experience has encompassed a wide array
of project-types, and his strengths lie in client
responsiveness, project organization, public
outreach, connectivity plans, streetscapes and
urban interventions, park design, and form-based
urban designs and planning strategies.
Education
MS, Landscape Architecture
Florida International University
BA, Architectural Studies
Florida International University
Licenses & Certifications
State of Florida
Registered Landscape Architect #LA6667663
Memberships & Affiliations
Underline - Design Advisory Committee
American Society of Landscape Architects
Project Experience
Design Lead
Lake Dalwigk Park
Vallejo, CA
2024
This Project provides for the improvement
and beautification of Lake Dalwigk Park
and enhanced community connections
from the surrounding neighborhoods into
the park. Specific elements include 3.8
acres of drought tolerant landscaping;
replacement of broken concrete pedestrian
path including grading for ADA access;
adding prefabricated restrooms and
connecting to existing utilities; extensive
pathway and park lighting utilizing solar
and/or low voltage LED lights; a pathway to
Curtola Park and Ride facility; pedestrian
bridge restoration; and installation of picnic
tables, trash cans, dog waste stations, shade
structures, drinking fountains, and two
monument signs.
Design Lead
North Palm Desert Community Park
Palm Desert, CA
2022 – Present
Park design consists of a multi-generational
playground, a large overflow retention basin
area that doubles as a versatile sports field,
an arts plaza, a continuous jogging trail,
dog parks, and sports courts for basketball,
volleyball, and other recreational activities.
To enhance its identity, the park incorporates
prominent architectural branding features,
creating a visually striking environment.
Extensive public outreach efforts are
currently underway to actively engage
residents and City stakeholders to gather
input and ensure the park reflects the
desires and aspirations of those it serves.
Design Lead
Antelope Creek Park
Woodlake, CA
2022 – Present
Park design includes flexible lawn areas,
softball and baseball fields, a multi-purpose
field, exercise and fitness trail, educational
gardens, basketball courts, volleyball courts,
a skate park and pump track, educational
wayfinding, a dog park, and a children’s
nature playground. Other enhancements
include native landscaping, designing
through CPTED, and celebrating the local
culture and diversity through public art.
Design Lead
East Naranjo Beautification and Connectivity
Woodlake, CA
2022 – Present
The project consists of constructing a Class
I Bike Path, ADA-accessible sidewalks and
ramps, installation of drought-tolerant
landscaping, energy-efficient lighting,
and decorative paving and parking
area improvements at the Woodlake
Botanical Garden. The project also includes
the removal of two parking lots and
reconfiguring the intersection of two storm
drain lines, installing park features, and
constructing a mid-block crosswalk and
sidewalks connecting Woodlake City Park
with the Botanical Gardens on East Naranjo
Blvd (SR216). The goal of the project is to
develop a cohesive, continuous experience
for the park users, cyclists, and visitors to the
Botanical Garden.
Design Lead
North Beach Oceanside Park
Miami Beach, FL
2016 – 2024
Park redesign for a densely-vegetated,
30-acre park, conceiving it as a series of
carefully orchestrated thresholds where
park users will never feel secluded, inactive
or unengaged. The design resulted in a
necklace of ‘pods’ that operate as a spine
to the project and serve to protect habitat
and increase the City’s management of
these natural resources. The project also
incorporates a rebranding of the City’s
established beachfront with an on-grade
beachwalk destined to be a terminus to the
City’s overall transportation infrastructure.
Design Lead
Guy Davis Community Park
Stuart, FL
2019 – Present
Sports complex design to include baseball/
softball field, soccer/football field, basketball
courts, batting cage, tennis courts, running/
walking track, volleyball courts, open event
lawn, playground, picnic areas, and various
park amenities.
Gianno Feoli, PLA, ASLA
Design Lead
24 Years of Experience 24 Years with the Firm
1157
Dominic is a landscape design professional
with over five years of experience in landscape
and urban design, including park design and
planting design for both publicly-funded and
private projects. Dominic has experience as
an architectural fabricator and 3D modeler for
landscape architectural and furniture design.
He contributes his experience in the creation
of communication graphics, 3D renderings,
providing schematic designs, fabrication
strategies paired with parametric design, and
the development of construction technical
drawings. Dominic is proficient in Rhino 3D,
Sketchup, AutoCAD, the Adobe Creative Suite (i.e.
Photoshop, Illustrator, InDesign, etc.), and other
integral pieces to programs such as Grasshopper,
Lumion, Rhino CAM, and Podium.
Education
Master of Landscape Architecture &
Environmental Urban Design
Florida International University, School of
Architecture, Miami, Florida - 2018
Licenses & Certifications
State of Florida
Registered Professional Landscape Architect,
Florida #LA6667598
Project Experience
Landscape Design Architect
North Palm Desert Community Park
Palm Desert, CA
2022 – Present
Extensive public outreach efforts are
currently underway that actively engage
residents and city stakeholders to gather
input and ensure the park reflects the
desires and aspirations of those it serves.
The park includes a multi-generational
playground, a large overflow retention
basin area that doubles as a versatile sports
field surrounded by topographical seating
for spectators, an arts plaza, a continuous
jogging trail winds, dog parks, and sports
courts for basketball, volleyball, and other
recreational activities.
Landscape Design Architect
Lake Dalwigk Park
Vallejo, CA
2024
This Project provides for the improvement
and beautification of Lake Dalwigk Park
and enhanced community connections
from the surrounding neighborhoods into
the park. Specific elements include 3.8
acres of drought tolerant landscaping;
replacement of broken concrete pedestrian
path including grading for ADA access;
adding prefabricated restrooms and
connecting to existing utilities; extensive
pathway and park lighting utilizing solar
and/or low voltage LED lights; a pathway to
Curtola Park and Ride facility; pedestrian
bridge restoration; and installation of picnic
tables, trash cans, dog waste stations, shade
structures, drinking fountains, and two
monument signs.
Landscape Design Architect
Antelope Creek Park
Woodlake, CA
2022 – Present
Park design includes flexible lawn areas,
softball and baseball fields, a multi-purpose
field, exercise and fitness trail, educational
gardens, basketball courts, volleyball courts,
a skate park and pump track, educational
wayfinding, a dog park, and a children’s
nature playground. Other enhancements
include native landscaping, designing
through CPTED, and celebrating the local
culture and diversity through public art.
Landscape Design Architect
East Naranjo Beautification and Connectivity
Woodlake, CA
2022 – Present
The project consists of constructing a Class
I Bike Path, ADA-accessible sidewalks and
ramps, installation of drought-tolerant
landscaping, energy-efficient lighting,
and decorative paving and parking
area improvements at the Woodlake
Botanical Garden. The project also includes
the removal of two parking lots and
reconfiguring the intersection of two storm
drain lines, installing park features, and
constructing a mid-block crosswalk and
sidewalks connecting Woodlake City Park
with the Botanical Gardens on East Naranjo
Blvd (SR216). The goal of the project is to
develop a cohesive, continuous experience
for the park users, cyclists, and visitors to the
Botanical Garden.
Landscape Design Architect
North Beach Oceanside Park
Miami Beach, FL
2016 – 2024
Park redesign for a densely-vegetated,
30-acre park. Developed conceptual
design, produced full illustrative package
for DRB approval, assisted in production
of construction documents, leading
construction administration services.
Memberships & Affiliations
Member
American Society of Landscape Architects (ASLA)
Broward Section Chair
Executive Committee - ASLA Florida, 2018-2019
Member-at-Large for Public Relations &
Marketing
Executive Committee - ASLA Florida, 2019-2022
Public Relations + Marketing Chair, 2020
Conference Committee - ASLA, 2019-2020
Awards & Recognition
2020 Design Award of Merit, SIB Pedestrian
Bridge Park
2020 Outstanding Study Award
2021 Design Award of Merit, Wilton Manors
Urban Form & Density Study
2021 Design Award of Merit, Himmarshee
Streetscape
2021 Design Award of Honor, Miami Beach
Urban Forestry Master Plan
Dominic James Mack, III, PLA, ASLA
Landscape Design Architect
5 Years of Experience 5 Years with the Firm
1158
Stuart has 39 years of experience working for the Riverside County Flood Control and Water Conservation District. He has been part of the District’s management team for the past 15 years and chief of three of the engineering divisions. His diverse expertise includes planning, watershed protection, floodplain management, and plan review. He currently serves as City Engineer for the Cities of San Jacinto and Canyon Lake, and in the past has served as City Engineer for the City of Perris and the March Joint Powers Authority.
Education
BS, Civil Engineering
California State University, San Diego
Licenses & Certifications
State of California Professional Civil Engineer
Registration #44553
Memberships & Affiliations
Certified Floodplain Manager, 2011
FEMA Risk MAP Operating Partners, NAFSMA Representative, 2010-2014 Floodplain Manager Association Conference Chairman, Anaheim 2013 Pillar, One Water, One Watershed SAWPA, 2013
Floodplain Manager Association Board of Directors, 2014-2015 Project Experience
Project Manager
State Street Improvements, CIP #24-001 / ARPA (SJ-534) & Shaver Street / San Jacinto Avenue Pavement Rehabilitation
San Jacinto, CA
2024
Rehabilitation of a 1.6-mile State Street segment, including 467,000 SF of asphalt grind and overlay (0.20-0.50 feet deep), 111,000 SF of full asphalt and base replacement, and traffic signal upgrades. Project Manager
Engineering Plan Check Services
Moreno Valley, CA
2023 – Present
Provide plan check services for private development improvement plans, including street improvements, grading, maps, easements, storm drainage, hydrology reports, erosion control, sewer plans, and on-site improvements. Interwest also reviews site plans, tentative maps, and technical studies during entitlements, drafting project conditions of approval.
Project Engineer
Highway Safety Improvement Project
Canyon Lake, CA
2024 – Present
The project adds lighting, signal plates, median barriers with landscaping, chevron signs, and warnings along 1.75 miles of Railroad Canyon Road, upgrading five signalized and two unsignalized intersections with a protected left-turn and new crosswalk for pedestrian safety
Project Manager
Mountain Avenue / Ramona Expressway / Vernon Avenue Pavement Rehabilitation
San Jacinto, CA
2023
Rehabilitation of deteriorated pavement on Ramona Expressway from Seventh Street to Esplanade Avenue, widening of Vernon Ave from 1st Street to Artesia Street, and the rehabilitation of a 2,000-foot segment of Ramona Expressway east of Warren Road. The rehabilitation of a 3,000-foot segment of Cottonwood Ave was added by change order. Project Manager
San Jacinto Pavement and Sidewalk Improvement Project
San Jacinto, CA
2022
Application of slurry seal; grind and asphalt overlay of distressed pavement; installation of ADA access ramps, curb, gutter, & sidewalks; and construction of widened pavement section along Artesia Avenue.
Stuart McKibbin, PE
Civil Engineering Lead
39 Years of Experience 5 Years with the Firm
1159
Richard is an experienced Land Use Planner
with more than 24 years of experience and a
demonstrated history of California land use
and environmental project management. He is
experienced in CEQA/NEPA compliance, Current
Planning, site planning, and legal research.
Education
BA, Urban and Regional Planning
Ryerson Polytechnic University
Toronto, ON, Canada
Licenses & Certifications
AEP Certification:
Advanced CEQA
UCLA Certifications:
Subdivision Map Act
CEQA
Project Experience
CEQA Specialist
Lake Dalwigk Park Improvements Project
Vallejo, CA
2023
Review of the Lake Dalwigk Enhancement
Project MND and regulatory permits, and
secure a Categorical Exemption for the
PW9443 project described as follows – “Lake
Dalwigk Park improvements associated with
the detention basin owned and managed
by Vallejo Flood and Wastewater District
(VFWD), the recreation park in the up-land
areas owned and managed by the Greater
Vallejo Recreation District (GVRD), and the
sidewalks and streets owned and managed
by the City.”
CEQA Project Manager
On-Call Planning & CEQA Services
City of Lodi, CA
2021 – Ongoing
Interwest provides on-call planning
services to the City under the direction of
the Community Development Director.
Services include general planning functions,
community assistance, processing planning
applications, coordinating with City
departments, conducting CEQA reviews,
and attending Planning Commission
and City Council meetings. Notable tasks
include preparing a Mitigated Negative
Declaration (MND) for the Lodi Residential
Complex Project, processing development
applications, assisting with environmental
reviews, amending the City’s zoning code
and growth management program, and
completing overdue SB 5 amendments to
the general plan and zoning code.
CEQA Specialist
Environmental Planning Services
City of Del Mar, CA
2023 – Ongoing
Interwest is providing CEQA compliance
services to the City. The most recent example
is a CEQA Initial Study Questionnaire (ISQ)
for a project that involves an update of
the City’s Short-Term Rental Ordinance.
Collaboration with city staff was essential in
completing the CEQA compliance services.
Interwest has already completed an Initial
Study/ Environmental Checklist for the city’s
proposed municipal code changes affecting
short-term rentals and is looking forward to
additional projects.
CEQA Specialist
On-Call Planning & CEQA Services
City of Palmdale, CA
2021 – Ongoing
Interwest provides planning staff services
to the City, assisting with the approval of
current planning projects and conducting
third-party CEQA reviews. Interwest also
updated the Local Hazard Mitigation Plan
(LHMP).
Principal Planner
Planning & CEQA Services
City of Oakland, CA
2022 – Ongoing
Interwest provides on-call planning services
to the City of Oakland’s Operations, Zoning,
and Development Planning Divisions, which
include CEQA compliance support. The
projects reviewed by Interwest range from
single-family hillside homes to 20-story
mixed-use developments in downtown
Oakland. Interwest has managed CEQA
consultants and sub-consultants for
large-scale land use projects requiring
Environmental Impact Reports (EIRs) and
Mitigated Negative Declarations (MNDs).
Additionally, the team has completed CEQA
reviews for various entitlement applications.
CEQA Specialist*
Yokohl Ranch New Town
Yokohl Valley, CA
2013 – 2015
36,000-acre, 10,000-unit Master
Development Plan and three Area
Development Plans, Federal and State
permits including USFWS section 7, USACE
section 404, SWRCB section 401, CDFW
section 1602. CEQA-Program Environmental
Impact Report.
CEQA Specialist*
Tulare County Central Road Yard Expansion
Tular County, CA
2013 – 2015
Site plan review by Tulare County and
approvals by the Tulare Irrigation District,
San Joaquin Valley Air Pollution Control
District, and Regional Water Quality
Control Board. CEQA-Mitigated Negative
Declaration.
CEQA Specialist*
Cottonwood Creek Integrated Resources
Management Program
Tulare County, CA
Federal and State permits including USACE
section 404, SWRCB section 401, CDFW
section 1602. CEQA-Program Environmental
Impact Report.
*Prior to joining Interwest.
Richard Walker
Environmental Consulting
24 Years of Experience 4 Years with the Firm
1160
Helen has four years of dedicated expertise in grant writing, with a robust skill set encompassing the entire grant process—from research to submittal to postaward administration. Her proficiency extends to the development of project scopes, site plans, and cross-sections, as well as community outreach, including the creation of fliers, resources, and surveys. She has helped local agencies across California secure over $47 million in project funding. While her proficiency spans various subjects, Helen has honed her specialization in transportation planning and grants, demonstrating a depth of knowledge and insight that consistently delivers results. Helen is proficient in Microsoft Word, Excel, PowerPoint, Google Suite, Adobe InDesign, and SAS Programming. Helen has past experience successfully administering a Prop 68 Parks Grant for the City of Greenfield.
Education
BA, Economics with Environmental Studies Minor
William Smith College
Project Experience
Grant Manager
City of Vallejo, CA
Interwest contracts with the City of Vallejo to provide grant management services, including preparing and compiling reports, financial statements, and invoices for submission to the appropriate funding agencies. Grant Writer
Reconnecting Communities Pilot (RCP) Discretionary Grant Program Greenway Development Project City of Vernon, CA
Awarded at the end of 2024, this grant funded a proposed 1.5-mile greenway project featuring a multi-use path with amenities and greenspace. The path will link existing and planned bike paths within the community and provide connections to public transportation routes and stops. Grant Writer
Rebuilding American Infrastructure (RAISE) Grant Program Bike Path Connector Project
City of Vernon, CA
As part of the Greenway Development Project, the grant will fund a bike path that connects a dead-end bike path to an existing path along the Los Angeles River.
Grant Writer
Environmental & Climate Justice Change Grant for the South Gate Park Auditorium Re-roof Project City of South Gate, CA
The grant funds the retrofitting of the South Gate Park auditorium to enhance efficiency. The project scope includes re-roofing, replacing the HVAC system, and sealing the building envelope. Additionally, the facility serves as a disaster preparedness site and emergency center.
Helen Maggitti
Grant Writer
8 Years of Experience 1 Year with the Firm
1161
EXPERIENCE
27 Years with N&M
39 Years Total
EDUCATION
MBA, 1998, University of California Davis
M.S., Geotechnical Engineering, 1989,
University of California Berkeley
B.S., Civil Engineering, 1987, University of
California Berkeley
REGISTRATIONS
PE 49665 (California)
GE 2509 (California)
Nuclear Gauge Operator Certification
PROFESSIONAL
AFFILIATIONS
American Society of Civil Engineers
EXPERIENCE
Garreth Saiki,
PE, GE
Principal Engineer
As a Principal Engineer for Ninyo & Moore, Mr. Saiki coordinates and conducts geotechnical evaluations for residential, commercial, and public facilities, including water infrastructure, highways, railroads, airports, public and private buildings, and bridges; performs slope stability analyses, flexible and rigid pavement design, and underground pipeline design; prepares and reviews geotechnical reports; and provides geotechnical design parameters and recommendations for shallow and deep foundations, retaining structures, in-situ ground remediation and earthwork; reviews laboratory results, project plans and specifications; Mr. Saiki also provides project coordination and oversees scheduling of field activities, supervises staff-level geologists and engineers, supervises field technicians and special inspectors, reviews project plans and specifications, and reviews laboratory test results for conformance with the project documents, including the Uniform Building Code (UBC), California Building Code (CBC), Federal Aviation Administration (FAA), State Department of Transportation (Caltrans), American Association of State Highway and Transportation Officials (AASHTO), and the Standard Specifications for Public Works Construction (Greenbook).
PROJECT EXPERIENCE
Miles Avenue and Warner Trail Widening, Indian Wells, California: Project Manager providing geotechnical consulting services for the Miles Avenue and Warner Trail widening and rehabilitation project in Indian Wells, California. The project included roadway widening, pavement overlay, and median improvements. Mr. Saiki performed pavement analyses and prepared our pavement report, which provided recommendations for pavement widening and new pavement overlay.
City of Rancho Cucamonga, Davis Trail, Rancho Cucamonga, California:
Principal Engineer retained for a geotechnical evaluation to assess the current condition of the equestrian trail and slope area of the community equestrian trail (Davis Trail) at the Davis Property in northern Rancho Cucamonga, California. The approximately 1,400-foot long portion of the Davis Trail is west of the intersection of Amethyst Street and Almond Street. The trail easement trends west from the intersection for approximately 500 feet before turning north for approximately 900 feet.
The trail is generally bound by a small residential community accessed by a private drive to the south, an equestrian center to the north and east, and undeveloped Thorpe Canyon to the west. The portion of the slope adjacent Thorpe Canyon is well-vegetated with chaparral, shrubs, and small trees. Services included review of readily available background material, including published geologic maps and literature, stereoscopic aerial photographs, and plans provided by the client, geotechnical site reconnaissance to observe and document the surficial conditions of the subject trail area that have excessive erosion and other areas that may Garreth M. Saiki, PE, GE | Ninyo & Moore | Geotechnical & Environmental Sciences Consultants 1 1162
be considered susceptible to erosion and slope failure, compilation and geotechnical analysis of the background information and field data, and preparation of a preliminary geotechnical report presenting our findings, conclusions, and recommendations.
Foothill Boulevard Bike/Pedestrian Bridge, Route 66 Trailhead and Street Improvement, Rancho Cucamonga, California: Served as Project Manager during the construction of the Foothill Boulevard Bike and Pedestrian Bridge located in Rancho Cucamonga. Services included geotechnical, materials testing, and inspection services for the construction of the Replacement of Pedestrian Bridge Decks Crossing over Deer Creek Channel project.
Peck Park Canyon Enhancement, San Pedro, California: Served as Project Manager retained to provide geotechnical consulting services for the Peck Park Canyon Enhancement Project in the San Pedro area of Los Angeles, California. The project involved the design and construction of Best Management Practices (BMP’s) to improve water quality, provide erosion protection, and reduce flooding potential along Peck Park Canyon and Dunn Canyon. Pedestrian bridges and pedestrian path improvements were also included in the project. Mr. Saiki performed a geotechnical evaluation for design purposes and oversaw geotechnical observation and testing services during the construction phase.
Manzanita Park, Hacienda Heights, California: Served as Project Engineer providing geotechnical consulting services for the proposed improvements at Manzanita Park, located on Kwis Avenue in the Hacienda Heights district of unincorporated Los Angeles County, California. The project involved rebuilding the Activity Building and courtyard, the construction of picnic shelters, and resurfacing the existing parking lot. Services included the excavation, sampling, and logging of four borings up to a depth of approximately 50 feet. Recommendations were provided for building foundations and pavement design.
City of Los Angeles, Albion Riverside Park, Lincoln Heights, California: Served as Principal Engineer providing geotechnical services for the redevelopment of historic industrial properties into a new regional park. The new park facilities were integrated with the existing Downey Park and Recreation Center adjacent to the old industrial property.
The new park design included soccer fields, fitness equipment, playgrounds, picnic areas, walking paths, open space and landscaping. Services included subsurface exploration, field permeability tests, geotechnical laboratory testing, engineering analyses, and preparation of a detailed geotechnical report to provide design and construction recommendations for the project. A significant geotechnical challenge for the project involved the suitability of the site for storm water infiltration.
County of San Bernardino Real Estate Services Department, On-Call Professional Services: Principal Engineer providing oversight for as-needed geotechnical engineering and materials testing and inspection services for the County of San Bernardino Real Estate Services Department. Services included on-call support of a variety of construction projects throughout the County of San Bernardino including the Forensic 2Y65 Crime Lab, the Fontana Crisis Stabilization Unit Facility 7N25, the Morongo Crisis Residential Treatment Facility 7N20, County Government Center Phase 1B site beautification 10.10.0017, and several other projects.
Accelerated Road Construction Program, Los Angeles County, California: Project Manager providing pavement evaluation and design services for the Accelerated Road Construction Program (ARCP) for the Department of Public Works, County of Los Angeles, California. This major fast-track county project included the evaluation of existing pavements for 84 different highway and street segments covering approximately 35 miles, and required extensive coordination efforts with various County departments and our sub-consultants. Mr. Saiki performed pavement analyses and prepared our materials reports that provided our geotechnical recommendations for the development of new pavement structural sections for asphalt concrete (AC) and Portland cement concrete (PCC) pavements, as well as AC and asphalt rubberized hot mix (ARHM) overlays. Our pavement analyses were performed in accordance with County guidelines and the Caltrans Highway Design Manual.
Garreth M. Saiki, PE, GE | Ninyo & Moore | Geotechnical & Environmental Sciences Consultants 2 Garreth Saiki,
Principal Engineer
1163
Rob Markes
Survey Manager
Mr. Markes has worked in the survey industry for 37 years. As crew chief, Rob oversees field procedures and is responsible for all office and field personnel. He is an experienced Survey Crew Chief excelling in topographic mapping, construction staking, and boundary surveys. His land surveying expertise includes supervising and performing Global Positioning System surveys, topographic surveys, aerial control surveys, horizontal and vertical control networks, title surveys, boundary surveys, cadastral surveys, geodetic surveys, engineering surveys and construction surveys, plus construction control and staking for a wide range of projects.
Experience:
Knights Landing Community Park, Knights Landing, CA
Survey Manager. This project includes the development and design of a new community park in Knights Landing which will feature a children's play area with river steamboat theme, picnic tables, little league/softball fields, soccer fields, and basketball courts, as well as the upgrade of restrooms and the conversion of an existing municipal building into a repurposed shade structure. UNICO is providing land surveying services, including topographic survey and base mapping, as well as boundary survey and mapping. Responsible for contract management, quality control, and design field surveys.
Lake Dalwigk Park, Vallejo, CA
Survey Manager. This project includes improvements and
beautification at Lake Dalwigk Park and enhanced community connections from the surrounding neighborhoods into the park.
Specific elements include 3.8 acres of drought tolerant landscaping, replacement of broken concrete pedestrian path including grading for ADA access; adding prefabricated restrooms and connecting to existing utilities; extensive pathway and park lighting; sidewalk replacement with decorative concrete, plus traffic calming measures, as well as the installation of two new monument signs, picnic tables, trash cans, dog waste stations, shade structure, and drinking fountains. UNICO is providing land surveying services, including topographic and boundary surveys, as well as base mapping.
Responsible for contract management, quality control, and design field surveys.
Manuel Vierra Park, Gridley, CA
Survey Manager. This project features improvements to Manuel Vierra Park, including ADA ramps and new inclusive play structures with musical elements, on-grade hillside slides, an expanded splash pad area with a water feature wall to provide greater separation Years of Experience:
Total: 37
With UNICO: 11
Expertise:
Boundary Determination
Caltrans Requirements
Construction Staking
FEMA Flood Surveys
Field Supervision
Legal Description
Mapping
Right of Way Engineering
Topographic Surveys
1164
Rob Markes
Survey Manager
from traffic, added seating around play areas, an amphitheater with hillside seating and concession stand, rehabilitated tennis courts, renovated group picnic areas with brick barbeques, bike trail, new restrooms, and additional lighting to enhance safety and security.
UNICO is providing land surveying services, including topographic survey and base mapping, as well as boundary and right of way surveys, Record of Survey preparation, and final monumentation.
Responsible for contract management, quality control, and design field surveys.
Lower Laguna Creek Open Space Trail Project, Elk Grove, CA Survey Manager. This project constructs more than 1-mile of Class I bikeway/multi-use trail through a permanent open space preserve adjacent to Laguna Creek. The project also includes a 60,000 square foot educational area with 8’ wide decomposed granite paths and interpretive sign stations, appropriate trail signs, striping, and pavement markings, and restoration of native riparian and wetland landscaping. UNICO analyzed previous survey information of the project area and utilized this information to create a workable 3D surface with contours. Supplemental topography and mapping of a small open space area just northeasterly of Dunstan Place was provided. UNICO also surveyed and mapped all property lines and right of way within the project limits. Responsible for contract management, field survey and quality control/quality assurance. 1165
Ryan Ming, PLS
Senior Land Surveyor
Mr. Ming is a professional land surveyor with 25 years of experience in managing land surveying activities and staffing; responsible for ensuring that sound land surveying principles are followed and that quality assurance goals are obtained; as well as participating in the development of best practices related to land surveying. Mr. Ming has thorough knowledge of principles, practices and procedures of boundary surveys, ALTA surveys, topographical surveys, construction surveys and control surveys. He also has thorough knowledge of parcel map, boundary line adjustments, legal description and easement preparation and submittals.
Experience:
Knights Landing Community Park, Knights Landing, CA
Senior Land Surveyor. This project includes the development and design of a new community park in Knights Landing which will feature a children's play area with river steamboat theme, picnic tables, little league/softball fields, soccer fields, and basketball courts, as well as the upgrade of restrooms and the conversion of an existing municipal building into a repurposed shade structure. UNICO is providing land surveying services, including topographic survey and base mapping, as well as boundary survey and mapping.
Responsible for design level topographic survey and right of way engineering.
Manuel Vierra Park, Gridley, CA
Senior Land Surveyor. This project features improvements to Manuel Vierra Park, including ADA ramps and new inclusive play structures with musical elements, on-grade hillside slides, an expanded splash pad area with a water feature wall to provide greater separation from traffic, added seating around play areas, an amphitheater with hillside seating and concession stand, rehabilitated tennis courts, renovated group picnic areas with brick barbeques, bike trail, new restrooms, and additional lighting to enhance safety and security.
UNICO is providing land surveying services, including topographic survey and base mapping, as well as boundary and right of way surveys, Record of Survey preparation, and final monumentation.
Responsible for topographic and boundary survey, and right of way engineering, including preparing plats and legal descriptions.
Del Rio Trail, Sacramento, CA
Senior Land Surveyor. This project constructs approximately 4.8 miles of Class 1 multi-use trail along the abandoned railway corridor west of Freeport Boulevard from south of Meadowview Road/Pocket Road to the Sacramento River Parkway north of Sutterville Road. The Years of Experience:
Total: 25
With UNICO: 7.5
Registration:
Professional Land Surveyor
– CA #8409
Expertise:
Boundary Determination
Topographic Surveys
Legal Descriptions
Mapping
Field Supervision
ALTA Surveys
Construction Staking
1166
Ryan Ming, PLS
Senior Land Surveyor
trail consists of a Class I multi-use trail (12 to 16 feet of pavement with unpaved shoulders ranging from 2 to 3 feet) and an adjacent 5- to 6-foot wide unpaved walking trail where feasible. The Del Rio Trail will receive at-grade crossings and intersection modifications at each location where the trail intersects a vehicular roadway. Responsible for design level topographic survey and right of way engineering.
Riverwalk Trail Extension, West Sacramento
Senior Land Surveyor. The project extended the Riverwalk Trail/levee access road approximately 2,100 linear feet along the levee crown from the existing I Street Bridge northward to the Broderick Boat Ramp. A High-Water Event Route along D Street, 3rd Street, and 2nd Street was also included so the trail maintains connectivity when the trail at the bridge undercrossing is inundated. This project provides a safe, ADA-accessible bike and pedestrian trail along the river and provides a levee access road. The completed Riverwalk Trail connects the Washington District and adjacent neighborhoods to the new C Street Bridge and Tower Bridge. Responsible for topographic and boundary survey, and right of way engineering, including preparing plats and legal descriptions.
1167
Thomas Howell, RA
Senior Principal | Holt Architecture
Role
Tom provides coordination between consultants and office staff in detailing drawings and preparing specifications, cost estimating, bidding/negotiation and observation of construction.
Education
Bachelor of Science Degree,
Architectural Studies,
University of Illinois
Master of Architecture,
Southern California Institute
of Architecture
Affiliations
• American Institute of Architects
• International Conference of Building
Officials
• Architectural Review Board - Rancho
Mirage
• California Baptist University - Construction
Management Advisory Board
Registration
Architect: CA #31626
NCARB: #160933
Matt Acton, RA
Principal, Project Manager | Holt Architecture
About
Matt has 15 years of industry experience, has been a part of the Holt Architecture team for 13 years, and has quickly risen to become a Principal.
Public Sector projects, specifically Public Safety projects, have been a staple of his experience including most recently a new Fire Station, Administration Building, Police Dispatch Center and master planning for a new Police Headquarters for the City of Indio.
Clients come to recognize his level of diligence and commitment to projects with past clients repeatedly commenting, “He made us feel like we were his only client.”
Role
Matt serves as the primary contact and will be Project Manager and Project Architect. He is directly involved in the design + development of the Project Documents from initial concept to final construction. He will provide day-today oversight of the Project Team, Project Schedule, and Budget.
Education
Bachelor of Science Degree,
Architecture, University of
Michigan, Ann Arbor
Registration
Architect: CA #37028
NCARB: #624984
About
Tom has over 30 years of industry experience, has been part of Holt Architecture for 25 years, and has ascended though the ranks to the role of Senior Principal. Throughout his time with Holt, he has completed a variety of Public Sector Safety Projects, including the East County Emergency Operation Center, which is one of the most complex and shortest in duration, being completed in just over one year from the start of design. 1168
P2S Inc.
Mechanical, Electrical, & Photovoltaic
Scott Newman has over eight years of experience in mechanical engineering and HVAC consulting. His experience includes new building and renovation projects at municipal facilities, university, college, and K-12 campuses, commercial office buildings and retail spaces, and athletic facilities. Services have ranged from sizing and selection of replacement mechanical equipment to new building design and energy studies.
Education
Bachelor of Science Degree,
Mechanical Engineering, University
of Southern California
Registration
Mechanical Engineer, California,
M39167
Scott Newman, PE
Mechanical Engineer | P2S Inc.
Relevant Experience
• County of San Bernardino, 851 Cooley Drive New Office Building • City of Santa Monica, Fire Station 5 Dormitory Tenant Improvements • City of Santa Clarita, LEED Silver New Community Center • City of La Mirada, Library Energy Upgrades
• City of Indio, Public Safety Campus
Lars Henderson has over nine years of experience creating electrical designs for the construction industry. Assignments have included municipal sites, educational institutions, commercial fit-outs, and mission critical facilities in the Los Angeles and New York City markets. Electrical service designs, landscape power renovations, and energy efficient lighting upgrades are areas Lars has accomplishments in. Beyond the compliances and routines of designing, it is the client’s end goal which Lars strives emphasis towards.
Education
Bachelor of Science Degree,
Electrical Engineering,
Pennsylvania State University
Lars Hendeson, PE
Lead Electrical Engineer | P2S Inc.
Registration
Electrical Engineer, California, E22361
1169
Eric Gomez has over 20 years of plumbing design, fire protection and construction experience. His extensive knowledge spans design, drafting, specifications, plan check submittals, cost estimates, inspections and construction administration. Eric has significant expertise in municipal, educational, recreational and office facilities. He has designed a comprehensive range of plumbing and fire protection systems such as campus natural gas supply distribution as part of master planning for future expansions on various college and university campuses.
Education
AS, Computer Aided Drafting, ITT
Technical Institute
Eric Gomez
Plumbing Engineer | P2S Inc.
Certifications
Certified in Plumbing Design (CPD)
Plumbing Design, University of
California, Los Angeles
Relevant Experience
• County of San Bernardino, 851 Cooley Drive New Office Building • County of Los Angeles, Hall of Records 7th Floor HVAC Modifications • City of Santa Clarita, LEED Silver New Community Center • City of Indio, New City Hall
• City of Indio, Public Safety Campus
P2S Inc.
Plumbing & Commissioning
Bryant Mercado has ten years of experience with HVAC mechanical, electrical, and plumbing systems. His experience in the field included new and retrofit mechanical and control systems, building automation system review and integration, and low voltage specialty systems for projects in higher education, commercial, entertainment and industrial fields.
Bryant serves capably as a Senior Commissioning Agent and Cx Project Manager. As a Cx agent his duties included project document control, design review, submittal reviews, system verification and startup checklist generation, facilitating startup of commissioned equipment and systems, generating preliminary functional test plans, site observation & progress reports, monitoring controls installation, monitoring TAB execution, reviewing manufacture checklists, reviewing as-built, reviewing controls programs, reviewing controls point to point checklists, reviewing operations and maintenance manuals, and facilitating operation and maintenance training.
He is a Certified Commissioning Authority (ACG) and Certified Energy Manager (AEE).
Education
BS, Mechanical Engineering
CSU Long Beach
BA, Physics, CSU Long Beach
Bryant Mercado
Senior Commissioning Agent | P2S Inc.
REGISTRATIONS
Mechanical Engineer,
California, M38548
1170
Wiseman + Rohy
Structural Engineer
Steve is directly involved with overseeing the production of drawings from initial client contact through efficient layout and management of the project. He establishes and enforces Quality Control and Quality Assurance guidelines for the company and projects. He develops company-wide standards to maintain consistent and efficient engineering, and implements ‘Lean Thinking’ principles for multidisciplinary efficiency.
Education
Bachelor of Science Degree,
Architectural Engineering
(Structural), Cal Poly San Luis
Obispo
Steve Rohym, SE
Principal in Charge | Wiseman + Rohy
Registration
Registered Structural Engineer, CA #S-4341, ID #S-11706 Registered Civil Engineer, CO #39469, OR #75625, WA #42184 Professional Affiliations
• Structural Engineers Association of San Diego (SEAOSD) | SEAOSD Board of Directors (2009-2011)
• Structural Engineers Association of California (SEAOC) | Convention House Chair
• American Institute of Steel Construction (AISC)
• American Welding Society (AWS)
• Earthquake Engineering Research Institute (EERI)
1171
CONNOR ZIELINSKI, ASIC, ASLA
PRESIDENT – IRRI DESIGN STUDIO
910 MABBETTE ST.
KISSIMMEE, FL 34741 407.744.3658 [email protected] BIO
The IDS team and I have completed and are currently a part of a multitude of different types of projects across the world. Our responsibilities include irrigation design including BIM modeling, water management services, and overall construction administration. It is our mission to provide sustainable irrigation system construction documents and consulting services that meet our client’s needs, while conserving water for future generations to come.
EDUCATION &
EXPERIENCE PROJECTS
13+ Years providing
irrigation design &
consulting services
Irrigation Design Specialist
– Hunter University
Bachelor’s in Finance –
University of Central
Florida
Certified Drafter – TECO
Notary Public
CERTIFICATIONS
Hunter University –
Irrigation Design Specialist
& ACC2
Certified Autocad Drafter -
TECO
Business Operation -
Technical Certificate
Business Specialist -
Technical Certificate
Business Management –
Technical Certificate
AFFILIATIONS
American Society of
Irrigation Consultants
Irrigation Association
American Society of
Landscape Architects
International
- Residential and Resort Island – UAE (Non-Disclosure)
- Airport Terminal- UAE (Non-Disclosure)
- Resort Island – UAE (Non-Disclosure)
- Inland Roads; Airport to Island – UAE (Non-Disclosure) - Resort – Athens, Greece (Non-Disclosure)
- Resort & Residences – Costa Rica (Non-Disclosure)
- Sports Complex – Costa Rica (Non-Disclosure
- Resort – Los Cabos, Mexico (Non-Disclosure)
Domestic
- Pinnacle Rental Community, Jacksonville, FL
- Astor Gardens Multifamily – Jacksonville, FL
- Lonestar Rd Renovations – Jacksonville, FL
- Spectrum Seven Pines – Jacksonville, FL
- Convention Center – Mongomery, TX
- Tampa Museum of Art – Tampa, FL
- Enterprise - Buena Park, CA
- Shell Building – Santa Maria, CA
- SunRail Station – Orlando, FL
- Residence - Hamptons, NY
- Condo complex – Santa Barbara, CA
- Walden Woods – Winter Park, FL
- Dania Point – Miami, FL
- Tahiti Beach – Miami, FL
- Fifth Hotel – Miami, FL
- FDOT US-441 – Leesburg, FL
- Savita Multi Family – Sanford, FL
- Flamingo Phase 5 – Miami Beach, FL
- Delray City Market – Delray Beach, FL
- La Botanica – Miami, FL
- The Ray Hotel – Miami, FL
- Warehouse Complex – Ocoee, FL
- Good Samaritan – Lompoc, CA
- Lompoc Self Storage – Lompoc, CA
- Rolling Hills Rodway – Orlando, FL
- South Terminal OIA - Orlando, FL
1172