Cities Index.
Agenda packet

Pico Rivera City Council
March 26, 2024

Document
Agenda packet
Meeting
March 26, 2024
Body
Pico Rivera City Council
Pages
38
Original file
85.5 MB
Text extracted from the city's file for reading and search. Open the original on picoriveraspeaks.org. That file is the official record.

department. With the upcoming budget and end of fiscal year review, the department is in need of a department head’s direction and leadership. Furthermore, the newly hired Deputy Director is set to take an extended leave of absence, resulting in a lack of executive leadership within the department.

Under Government Code section 21221(g) of the Public Employees’ Retirement Law (PERL) a CalPERS municipality is allowed to hire a retired annuitant when there is an active member who is out on leave, and there is a need to utilize a retired annuitant to fill in the vacancy. The following are the conditions and limitations on such appointments, per the Government Code Section 21221(g) PERL:

Upon employment by a contracting agency to a position found by the governing body, by resolution, to be available because of a leave of absence granted to a person on payroll status for a period not to exceed one year and found by the governing body to require specialized skills. The temporary employment shall be terminated at the end of the leave of absence. Appointments under this section shall be reported to the board and shall be accompanied by the resolution adopted by the governing body.

Staff anticipates services needed would be for 40 hours per week at a rate of $85 per hour, not-to-exceed $150,000 for the combined two (2) fiscal years of 2023-24 and 2024-

25. Conclusion:

Staff recommends that City Council approve a resolution appointing Retired Annuitant Kenneth L. Louie as Interim Director of Administrative Services and Amendment No. 1 to Agreement No. 24-2292 with Kenneth L. Louie, in an amount not-to-exceed $150,000 for Interim Administrative Services Director. Approval will ensure that department operations continue to function efficiently while accomplishing City goals.

Steve Carmona
SC:AG:NK:sp
Enclosures: 1) Resolution
2) Amendment No. 1
RESOLUTION NO. _______

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PICO RIVERA,

CALIFORNIA, APPROVING THE APPOINTMENT OF RETIRED
ANNUITANT KENNETH L. LOUIE AS INTERIM DIRECTOR OF

ADMINISTRATIVE SERVICES PURSUANT TO GOVERNMENT CODE
§7522.56 and §21221(g)
WHEREAS, in compliance with Government Code §7522.56 and §21221(g), the City Council of the City of Pico Rivera must provide CalPERS this resolution when a retired annuitant is employed to fill a position during a leave of absence granted to a person on payroll status for a period not to exceed one year and found to require specialized skills; and
WHEREAS, Kenneth L. Louie is a retired annuitant who possesses specialized skills and extensive experience in public sector administrative and financial leadership; and WHEREAS, the City Council desires to appoint Kenneth L. Louie as the Interim Director of Administrative Services for the City of Pico Rivera effective February 26, 2024; and
WHEREAS, the hourly rate paid to Kenneth L. Louie will be $85.00 per hour and Kenneth L. Louie will not receive any other benefit, incentive, compensation in lieu of benefit or other form of compensation in addition to this hourly pay rate.

NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Pico Rivera as follows:

SECTION 1. That the nature of the appointment of Kenneth L. Louie as described herein and that this appointment is necessary to fill the critically needed position of Interim Director of Administrative Services for the City of Pico Rivera effective February 26, 2024, because of the approved leave of absence of the incumbent Director of Administrative Services and Kenneth L. Louie’s specialized skills and knowledge in public sector financial management and leadership.

SECTION 2. The City Clerk shall attest to the passage of this resolution, and it shall thereupon be in full force and effect.
[Signatures on the following page]
Enclosure 1
7a
RESOLUTION NO. ____

Page 2 of 2 ends

APPROVED AND PASSED this 26th day of March, 2024.
____________________________
Andrew C. Lara, Mayor
ATTEST: APPROVED AS TO FORM:
____________________________ __________________________________ Cynthia Ayala, City Clerk Arnold M. Alvarez-Glasman, City Attorney AYES:

NOES:

AMENDMENT NO. 1

TO THE PROFESSIONAL SERVICES AGREEMENT
WITH KENNETH L. LOUIE, AGREEMENT NO. 24-2292
THIS AMENDMENT NO. 1 TO AGREEMENT NO. 24-2292 FOR PROFESSIONAL SERVICES WITH KENNETH L. LOUIE, (“Amendment No. 1"), effective as of the date specified in paragraph five (5) hereof, is made and entered into by and between the CITY OF PICO RIVERA (“CITY”), and KENNETH L. LOUIE, (“CONSULTANT”).

RECITALS
A. CITY and CONSULTANT (collectively referred to as the “PARTIES”) have previously executed that certain Agreement for Professional Services, Agreement No. 24-2292 (“Agreement”) relating to professional services in the City of Pico Rivera.

B. The PARTIES desire to amend said Agreement as set forth herein, pursuant to Section 5.1 of the Agreement.

NOW, THEREFORE, THE PARTIES AGREE AS FOLLOWS:

1. MODIFICATION OF SCOPE OF SERVICES TO BE PERFORMED BY THE CONSULTANT.

The Scope of Services to be performed by CONSULTANT, as set forth in the Agreement shall not be modified.

2. TIME FOR COMPLETION OF MODIFIED WORK AND SERVICES.

The “Expiration Date” defined in Section 3.4 is hereby amended as follows:
“Expiration Date”: February 25, 2025.

3. MODIFICATION OF CONSULTANT’S COMPENSATION.

The compensation to be paid by CITY to CONSULTANT for the modified work and services identified in this Amendment No. 1 shall be as follows:

Total compensation in accordance with the Consultant’s Fee Proposal dated February 26, 2024 for an amount not-to-exceed $150,000 (One hundred fifty thousand) dollars.

4. EFFECT OF AMENDMENTS.

Except as modified herein, either expressly or by necessary implication, the terms and provisions of the Agreement between the CITY and CONSULTANT shall remain Enclosure 2
7b
Amendment No. 1 to Professional Services Agreement No. 24-2292 Kenneth L. Louie

Page 2 of 2 ends

in full force and effect.

5. EFFECTIVE DATE.

Unless otherwise specified herein, this Amendment No. 1 shall become effective as of the date set forth below on which the last of the parties, whether CITY or CONSULTANT, executes this Amendment No. 1.

IN WITNESS WHEREOF, the parties hereto have caused this Amendment No. 1 to be executed and attested by their respective officers hereunto duly authorized. “CITY” “CONSULTANT”
CITY OF PICO RIVERA KENNETH L. LOUIE
______________________________ _________________________________ Andrew C. Lara, Mayor Kenneth L. Louie, Consultant
Dated: ________________________ Dated: ____________________________ ATTEST: APPROVED AS TO FORM
___________________________ _________________________________ Cynthia Ayala, City Clerk Arnold M. Alvarez-Glasman, City Attorney To: Mayor and City Council
From: City Manager
Meeting Date: March 26, 2024
Subject: AWARD A PROFESSIONAL SERVICES AGREEMENT
WITH HARRIS & ASSOCIATES, INC., FOR A

DEVELOPMENT IMPACT FEE STUDY
Recommendation:

1. Award a Professional Services Agreement to Harris & Associates, Inc. to prepare a Development Impact Fee Study for an amount not-to-exceed $57,000; and

2. Authorize the City Manager to execute the Professional Services Agreement with Harris & Associates, Inc., in a form approved by the City Attorney for a term of one (1) year with a second-year extension if required.

Fiscal Impact:

Sufficient funding is available in the fiscal (FY) 2024-25 Adopted Budget, within the General Fund Account No. 180.30.3010-54400 (Professional Services). No additional appropriations are needed at this time.

Background:

Development Impact Fees (DIF) allow cities to collect fees to fund improvements that address infrastructure and facility impacts from new development projects.

DIF’s are based on proposed facility and infrastructure requirements identified in the City’s Capital Improvement Program. DIFs must comply with the Mitigation Fee Act (California Government Code Section 66000 et seq., also known as “AB 1600”). Under the Mitigation Fee Act, a local agency imposing mitigation fees is required to make certain findings annually and every five (5) years. If the findings are not made, the local agency must refund all unexpended fees to all current record owners of property against which the fee was imposed. Furthermore, Assembly Bill 602, which became State law on January 1, 2022, made significant procedural and substantive changes in the ways that local governments may calculate, establish, and publicly disclose their development impact fees and fee policies. AB 602 will now require that local agencies adopt an 8 CITY COUNCIL AGENDA REPORT – MEETING OF MARCH 26, 2024

AWARD A PROFESSIONAL SERVICES AGREEMENT WITH HARRIS & ASSOCIATES, INC., FOR A DEVELOPMENT IMPACT FEE STUDY

Page 2 of 3 ends

appropriate nexus study, which supports and justifies the calculation and imposition of DIFs, as a pre-condition to the adoption of new development fees. Other changes created by AB 602 include:
• Generally, requires that nexus studies shall “identify the existing level of service for each public facility,” and if it is claimed that the nexus study supports the increase of an existing fee, this bill requires the local agency to review the assumptions supporting the existing fee and the amount of fees collected under the existing fee schedule;
• Generally, requires that a nexus study for a fee “imposed on a housing project adopted after July 1, 2022, shall calculate the fee proportionately to the square footage of proposed units” in the development project (subject to local exception); and
• Nexus studies must be updated at least every eight (8) years.

The City currently has two development impact fees that include the following:

Park Land Dedication In-Lieu Fee
The City requires residential developments with subdivisions to dedicate land, or pay a fee in lieu thereof, or both, for park and/or recreation purposes based on the average fair market value for the City. The requirement does not apply to commercial or industrial subdivisions. The amount of land to be dedicated is calculated as follows:
• 0.008 acres per resident of the subdivision. The number of residents of the subdivision shall be calculated by multiplying the number of residential units by the average number of persons per household. The presumption contained in Section 66477 of the Subdivision Map Act may be used to calculate the average number of persons per household.

Public Image Enhancement (PIE)
The Public Image Enhancement (PIE) fee from the adopted 1993 General Plan was meant to enhance the overall image of the city through aesthetic and cultural improvements. The fee applies to all new developments in residential zones with building valuations of $100,000 or more, or for new or remodeled development in all commercial and industrial zones of building valuations of $150,000 or more. Fees are paid at time of certificate of occupancy issuance, and are calculated as follows:
• Residential: 0.5% of building valuation. For an owner-constructed and owneroccupied single-family residential unit, the first one hundred thousand dollars of building valuation is exempt from fee calculations; fees shall be calculated based on valuations greater than one hundred thousand dollars. For all other uses, fees shall include the first one hundred thousand dollars of building valuation.

CITY COUNCIL AGENDA REPORT – MEETING OF MARCH 26, 2024

AWARD A PROFESSIONAL SERVICES AGREEMENT WITH HARRIS & ASSOCIATES, INC., FOR A DEVELOPMENT IMPACT FEE STUDY

Page 3 of 3 ends

• Commercial or Industrial: 1.0% of building valuation. Expenditure of fee may only be allotted for public space and right-of-way improvements.

Discussion:

The City received four (4) proposals including DTA Municipal Solutions, Harris & Associates, Inc. (Harris), Matrix Consulting Group, and Willdan Financial Services. Staff reviewed proposals and held interviews with each firm. Firms were scored utilizing the following criteria: 1) Understanding of the scope of work, 2) Demonstrated professional skill and credentials, 3) Related experience and references, 4) Quality of work samples, and 5) Approach to performing this type of service.

Staff arrived at the consensus that Harris was the most qualified respondent based on the evaluation criteria. Harris demonstrated an understanding of the City’s scope for the DIF study, a comprehensive project timeline and emphasized the importance of the community outreach component.

Environmental analysis:

The award of the contract does not have the potential for creating a significant effect on the environment and is therefore exempt from further review under the California Environmental Quality Act (CEQA) pursuant to State CEQA Guidelines Section 15060(c)(3) because it is not a project as defined by the CEQA Guidelines Section 15378.

The agreement does not have the potential for resulting in either a direct physical change in the environment or a reasonably foreseeable indirect physical change in the environment. If any new DIF fees are implemented, they will be reviewed for CEQA compliance.

Conclusion:

Staff recommends awarding a Professional Services Agreement to Harris & Associates, Inc., to prepare a Development Impact Fee Study on an as-needed basis for a term of one (1) year in an amount not-to-exceed $57,000 with a second-year extension if required.

Steve Carmona
SC:AB:JG:JP:jj
Enclosure: 1) Professional Services Agreement
AGREEMENT NO. ____

PROFESSIONAL SERVICES AGREEMENT

BETWEEN THE CITY OF PICO RIVERA AND
HARRIS & ASSOCIATES, INC.

1. IDENTIFICATION
THIS PROFESSIONAL SERVICES AGREEMENT (“Agreement”) is entered into by and between the City of Pico Rivera, a California municipal corporation (“City”) and Harris & Associates, Inc., (“Consultant”). City and Consultant are sometimes hereinafter individually referred to as a “Party” and collectively referred to as “Parties.”

2. RECITALS

2.1 City has determined that it requires professional services from a consultant to provide a development impact fee study.

2.2 Consultant represents that it is fully qualified to perform such professional services by virtue of its experience and the training, education and expertise of its principals and employees. Consultant further represents that it is willing to accept responsibility for performing such services in accordance with the terms and conditions set forth in this Agreement.

NOW, THEREFORE, for and in consideration of the performance by the Parties of the mutual covenants and conditions herein contained, the Parties hereto agree as follows:

3. DEFINITIONS

3.1 “Scope of Services”: Such professional services as are set forth in the Consultant’s January 11, 2024, proposal to City attached hereto as Exhibit “A” and incorporated herein by this reference.

3.2 “Approved Fee Schedule”: Such compensation rates as are set forth in the Consultant’s February 26, 2024, proposal to City attached hereto as Exhibit “B.”

3.3 “Commencement Date”: April 1, 2024

3.4 “Expiration Date”: June 30, 2025

4. TERM
The term of this Agreement shall commence at 12:00 a.m. on the Commencement Date and shall expire at 11:59 p.m. on the Expiration Date unless extended by written agreement of the Parties or terminated in accordance with Section 22 below.

Enclosure 1
8a
Professional Services Agreement
HARRIS & ASSOCIATES, INC.

Page 2 of 19 ends

5. CONSULTANT’S SERVICES

5.1 Consultant shall perform the services identified in the Scope of Services. City shall have the right to request, in writing, changes in the Scope of Services. Any such changes mutually agreed upon by the Parties, and any corresponding increase or decrease in compensation, shall be incorporated by written amendment to this Agreement. In no event shall the total compensation and costs payable to Consultant under this Agreement exceed the sum of FIFTY-SEVEN THOUSAND DOLLARS ($57,000.00) unless specifically approved in advance, in writing, by City.

5.2 Consultant shall perform all work consistent with the professional skill and care ordinarily used by members of the subject profession practicing in the same or similar locality under the same or similar circumstances and in a manner reasonably satisfactory to City.

6. COMPENSATION

6.1 City agrees to compensate Consultant for the services provided under this Agreement, and Consultant agrees to accept in full satisfaction for such services, payment in accordance with the Approved Fee Schedule.

6.2 Consultant shall submit to City an invoice, on a monthly basis or less frequently, for the services performed pursuant to this Agreement. Each invoice shall itemize the services rendered during the billing period and the amount due. Within ten (10) business days of receipt of each invoice, City shall notify Consultant in writing of any disputed amounts included on the invoice. Within thirty (30) calendar days of receipt of each invoice, City shall pay all undisputed amounts included on the invoice. City shall not withhold applicable taxes or other authorized deductions from payments made to Consultant.

6.3 Payments for any services requested in writing by City and not included in the Scope of Services shall be made to Consultant by City on a time-and-materials basis using Consultant’s standard fee schedule. Fees for such additional services shall be paid within thirty (30) days of the date Consultant issues an invoice to City for such services.

7. BUSINESS LICENSE
Consultant shall obtain a City business license prior to commencing performance under this Agreement.

8. COMPLIANCE WITH LAWS
Consultant shall keep informed of State, Federal and Local laws, ordinances, codes and regulations that in any manner affect those employed by it or in any way affect the performance of its services pursuant to this Agreement. The Consultant shall at all times comply with such laws, ordinances, codes and regulations. Without limiting the generality of the foregoing, if Consultant is an out-of-state corporation or LLC, it must be Professional Services Agreement
HARRIS & ASSOCIATES, INC.

Page 3 of 19 ends

qualified and registered to do business in the State of California pursuant to sections 2105 and 17708.02 of the California Corporations Code. The City, its officers and employees shall not be liable at law or in equity occasioned by failure of Consultant to comply with this Section.

9. CONFLICT OF INTEREST
Consultant covenants that it presently has no interest and shall not acquire any interest, direct or indirect, which may be affected by the services to be performed by Consultant under this Agreement, or which would conflict in any manner with the performance of its services hereunder. During the term of this Agreement, Consultant shall not perform any work for another person or entity for whom Consultant was not working at the Commencement Date if both: (i) such work would require Consultant to abstain from a decision under this Agreement pursuant to a conflict of interest statute; and (ii) City has not consented in writing prior to Consultant’s performance of such work.

10. PERSONNEL
Consultant represents that it has, or will secure at its own expense, all personnel required to perform the services identified in the Scope of Services. All such services shall be performed by Consultant or under its supervision, and all personnel engaged in the work shall be qualified to perform such services. Consultant reserves the right to determine the assignment of its own employees to the performance of Consultant’s services under this Agreement, but City reserves the right, for good cause, to require Consultant to exclude any employee from performing services on City’s premises. Alison Bouley, Vice President shallbe Consultant’s project administrator and shall have direct responsibility for management of Consultant’s performance under this Agreement. No change shall be made in Consultant’s project administrator without City’s prior written consent.

11. OWNERSHIP OF WRITTEN PRODUCTS
All reports, documents or other written material (“written products”) developed by Consultant in the performance of this Agreement shall be and remain the property of City without restriction or limitation upon its use or dissemination by City. Consultant may take and retain copies of such written products as desired, but no such written products shall be the subject of a copyright application by Consultant. If any state, federal, or local law requires mandatory copyright protection for Consultant’s work product, City shall comply with such laws to the extent feasible.

12. INDEPENDENT CONSULTANT

12.1 Consultant is, and shall at all times remain as to City, a wholly independent consultant. Consultant shall have no power to incur any debt, obligation, or liability on behalf of City or otherwise to act on behalf of City as an agent. Neither City nor any of its Professional Services Agreement
HARRIS & ASSOCIATES, INC.

Page 4 of 19 ends

officers, employees or agents shall have control over the conduct of Consultant or any of Consultant’s employees, except as set forth in this Agreement. Consultant shall not at any time represent that it is, or that any of its agents or employees are, in any manner employees of City.

12.2 The Parties further acknowledge and agree that nothing in this Agreement shall create or be construed to create a partnership, joint venture, employment relationship, joint-employer relationship, or any other relationship between Consultant or Consultant’s employees except as set forth in this Agreement.

12.3 City shall have no direct or indirect control over Consultant’s employees or sub-consultants with respect to wages, hours, and working conditions. In addition, City shall not deduct from the Compensation paid to Consultant any sums required forSocial Security, withholding taxes, FICA, state disability insurance or any other federal, state or local tax or charge which may or may not be in effect or hereinafter enacted or required as a charge or withholding on the compensation paid to Consultant, Consultant’s employees or subconsultants.

City shall have no responsibility to provide Consultant, its employees or subconsultants with workers’ compensation insurance or any other insurance.

12.4 The Parties further acknowledges the following: (i) that Consultant shall provide the services outlined in the Scope of Services directly to City; (ii) Consultant maintains a business location at the address listed under Section 20 that is separate and distinct from the City; (iii) Consultant contracts with other businesses to provide the same or similar services and maintains a clientele without restriction from the City; (iv) Consultant advertises and holds itself out to the public as available to provide the same or similar services; (v) unless otherwise specified in this Agreement, Consultant provides its own tools, vehicles, and equipment necessary for performing the Scope of Services; (vi) Consultant has proposed and negotiated its own rates; and (vii) consistent with the nature and demands of the project and the City’s business hours, Consultant may set its own hours and location of work.

13. CONFIDENTIALITY
All data, documents, discussion, or other information developed or received by Consultant or provided for performance of this Agreement are deemed confidential and shall not be disclosed by Consultant without prior written consent by City. City shall grant such consent if disclosure is legally required. Upon request, all City data and any copies thereof shall be returned to City upon the termination or expiration of thisAgreement.

14. NON-LIABILITY OF CITY OFFICIALS AND EMPLOYEES
No official or employee of the City shall be personally liable to Consultant in the event of any default or breach by City, or for any amount which may become due to Consultant.

Professional Services Agreement
HARRIS & ASSOCIATES, INC.

Page 5 of 19 ends

15. INDEMNIFICATION

15.1 The Parties agree that City, its officers, staff, elected and appointed officials, employees, affiliated public agencies should, to the extent permitted by law, be fully protected from any loss, injury, damage, claim, lawsuit, cost, expense, reasonable attorneys’ fees, litigation costs, to the extent arising out of or related to the negligent performance of this Agreement. Accordingly, the provisions of this indemnity provision are intended by the Parties to be interpreted and construed to provide the fullest protection possible under the law to City. Consultant acknowledges that City would not enter into this Agreement in the absence of Consultant’s commitment to indemnify and protect City as set forth herein. Notwithstanding the foregoing, to the extent Consultant's services are subject to Civil Code Section 2782.8, the above indemnity shall be limited, to the extent required by Civil Code Section 2782.8, to claims that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant.

15.2 To the full extent permitted by law, Consultant shall indemnify, hold harmless and defend City, its officers, , staff, elected and appointed officials, employees, affiliated public agencies from and against claims, demands, lawsuits, causes of action, losses, costs or expenses for any damage due to death or injury to any person and injury to any property to the extent resulting from or arising out of any intentional, reckless, negligent, or otherwise wrongful acts, errors or omissions of Consultant or any of its officers, employees, servants, agents, or subconsultants in the performance of this Agreement.

Such costs and expenses shall include reasonable attorneys’ fees incurred by counsel reasonably acceptable to the City and expert witness fees and consultant fees.

Notwithstanding the foregoing, to the extent Consultant's Services are subject to Civil Code Section 2782.8, the above indemnity shall be limited, to the extent required by Civil Code Section 2782.8, to claims that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant.

15.3 City shall have the right to offset against the amount of any compensation due Consultant under this Agreement any amount due City from Consultant as a result of Consultant’s failure to pay City promptly any indemnification arising under this Section 15 or related to Consultant’s failure to either: (i) pay taxes on amounts received pursuant to this Agreement or (ii) comply with applicable workers’ compensation laws.

15.4 The obligations of Consultant under this Section 15 will not be limited by the provisions of any workers’ compensation act or similar act. Consultant expressly waives its statutory immunity under such statutes or laws as to City, its officers, agents, employees and volunteers.

15.5 Consultant agrees to obtain executed indemnity agreements with provisions identical to those set forth here in this Section 15 from each and every subconsultant or any other person or entity involved by, for, with or on behalf of Consultant in the performance of this Agreement. In the event Consultant fails to obtain such indemnity obligations from others as required herein, Consultant agrees to be fully responsible and Professional Services Agreement
HARRIS & ASSOCIATES, INC.

Page 6 of 19 ends

indemnify, hold harmless and defend City, its officers, staff, elected and appointed officials, employees, affiliated public agencies from and against claims, demands, lawsuits, causes of action, losses, costs or expenses for any damage due to death or injury to any person and injury to any property to the extent resulting from or arising out of any intentional, reckless, negligent, or otherwise wrongful acts, errors or omissions of Consultant’s subconsultants or any other person or entity involved by, for, with or on behalf of Consultant in the performance of this Agreement. Such costs and expenses shall include reasonable attorneys’ fees incurred by counsel of reasonably acceptable to the City and expert witness fees and consultant fees.

15.6 City does not, and shall not, waive any rights that it may possess against Consultant because of the acceptance by City, or the deposit with City, of any insurance policy or certificate required pursuant to this Agreement. This hold harmless and indemnification provision shall apply regardless of whether or not any insurance policies are determined to be applicable to the claim, demand, damage, liability, loss, cost or expense.

15.7 PERS ELIGIBILITY INDEMNITY. In the event that Consultant or any employee, agent, or subconsultant of Consultant providing services under this Agreement claims or is determined by a court of competent jurisdiction or the California Public Employees Retirement System (PERS) to be eligible for enrollment in PERS as an employee of the City, Consultant shall indemnify, defend, and hold harmless City for the payment of any employee and/or employer contributions for PERS benefits on behalf of Consultant or its employees, agents, or subconsultants, as well as for the payment of any penalties and interest on such contributions, which would otherwise be the responsibility of City.

Notwithstanding any other agency, state or federal policy, rule, regulation, law or ordinance to the contrary, Consultant and any of its employees, agents, and subconsultants providing service under this Agreement shall not qualify for or become entitled to, and hereby agree to waive any claims to, any compensation, benefit, or any incident of employment by City, including but not limited to eligibility to enroll in PERS as an employee of City and entitlement to any contribution to be paid by City for employer contribution and/or employee contributions for PERS benefits.

16. INSURANCE

16.1 During the term of this Agreement, Consultant shall carry, maintain, and keep in full force and effect insurance against claims for death or injuries to persons or damages to property that may arise from or in connection with Consultant’s performance of this Agreement. Such insurance shall be of the types and in the amounts as set forth below:

16.1.1 Commercial general liability, and Umbrella or Excess Liability Insurance covering all operations by or on behalf of Consultant Professional Services Agreement
HARRIS & ASSOCIATES, INC.

Page 7 of 19 ends

providing insurance for bodily injury liability and property damage liability for the following and including coverage for:

16.1.1.1 Premises, operations, and mobile equipment

16.1.1.2 Products and completed operations

16.1.1.3 Broad form property damage (including completed operations)

16.1.1.4 Explosion, collapse, and underground hazards

16.1.1.5 Personal Injury

16.1.1.6 Contractual liability in the amount of One Million Dollars ($1,000,000) per occurrence combined single
limit; Two Million Dollars ($2,000,000) aggregate for
products/completed operation; Two Million Dollars
($2,000,000) general aggregate (General aggregate
must apply separately to Consultant’s work under this
Agreement.); and One Million Dollars ($1,000,000)
umbrella or excess liability.

16.1.2 Automobile Liability Insurance for owned, hired and non-owned vehicles utilized by Consultant, its employees or subconsultants, in the amount of One Million Dollars ($1,000,000) per accident for bodily injury and property damage.

16.1.3 Worker’s Compensation Insurance as required by the laws of the State of California, with Statutory Limits, and Employer's Liability Insurance with limit of no less than One Million Dollars ($1,000,000) per accident for bodily injury or disease.

16.1.4 Professional Liability Insurance against errors and omissions in the performance of the work under this Agreement with coverage limits of not less than One Million Dollars ($1,000,000) per occurrence of claim/ Two Million Dollars ($2,000,000) in the aggregate.

16.2 Consultant shall require each of its subconsultants, if any, to maintain insurance coverage that meets all of the requirements of this Agreement.

16.3 The policy or policies required by this Agreement shall be issued by an insurer admitted in the State of California and with a rating of at least A:VII in the latest edition of Best’s Insurance Guide.

16.4 Consultant agrees that if it does not keep the aforesaid insurance in full Professional Services Agreement
HARRIS & ASSOCIATES, INC.

Page 8 of 19 ends

force and effect City may either: (i) immediately terminate this Agreement; or (ii) takeout the necessary insurance and pay, at Consultant’s expense, the premium thereon.

16.5 At all times during the term of this Agreement, Consultant shall maintain on file with City’s Risk Manager a certificate or certificates of insurance showing that the aforesaid policies are in effect in the required amounts and, for the general liability and automobile liability policies, naming the City as an additional insured. Consultant shall, prior to commencement of work under this Agreement, file with City’s Risk Manager such certificate(s).

16.6 Consultant shall provide proof that policies of insurance required herein expiring during the term of this Agreement have been renewed or replaced with other policies providing at least the same coverage. Consultant shall provide such proof to City at least two weeks prior to the expiration of the coverages.

16.7 The general liability and automobile policies of insurance required by this Agreement shall contain an endorsement naming City, its officers, employees, agents and volunteers as additional insureds. All of the policies required under this Agreement shall contain an endorsement providing that the policies cannot be canceled or reduced except on thirty days’ prior written notice to City. Consultant agrees to require its insurer to modify the certificates of insurance to delete any exculpatory wording stating that failure of the insurer to mail written notice of cancellation imposes no obligation, and to delete the word “endeavor” with regard to any notice provisions.

16.8 The general liability and automobile policies of insurance provided by Consultant shall be primary to any coverage available to City. Any insurance or selfinsurance maintained by City, its officers, employees, agents or volunteers, shall be in excess of Consultant’s insurance and shall not contribute with it.

16.9 All insurance coverage provided pursuant to this Agreement shall not prohibit Consultant, and Consultant’s employees, agents or subconsultants, from waiving the right of subrogation prior to a loss. Consultant hereby waives all rights of subrogation against the City.

16.10 Any deductibles or self-insured retentions must be declared to and approved by the City. At the option of City, Consultant shall either reduce or eliminate the deductibles or self-insured retentions with respect to City, or Consultant shall procure a bond guaranteeing payment of losses and expenses.

16.11 Procurement of insurance by Consultant shall not be construed as a limitation of Consultant’s liability or as full performance of Consultant’s duties to indemnify, hold harmless and defend under Section 15 of this Agreement.

16.12 If Consultant maintains broader coverage and/or higher limits than the minimums shown above, the City requires and shall be entitled to the broader coverage Professional Services Agreement
HARRIS & ASSOCIATES, INC.

Page 9 of 19 ends

and/or the higher limits maintained by the Consultant. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City.

17. MUTUAL COOPERATION

17.1 City shall provide Consultant with all pertinent data, documents and other requested information as is reasonably available to City for the proper performance of Consultant’s services under this Agreement.

17.2 In the event any claim or action is brought against City relating to Consultant’s performance in connection with this Agreement, Consultant shall render any reasonable assistance that City may require.

18. RECORDS AND INSPECTIONS
Consultant shall maintain full and accurate records with respect to all matters covered under this Agreement for a period of three years after the expiration or termination of this Agreement. City shall have the right to access and examine such records, without charge, during normal business hours. City shall further have the right to audit such records, to make transcripts therefrom and to inspect all program data, documents, proceedings, and activities.

19. PERMITS AND APPROVALS
Consultant shall obtain, at its sole cost and expense, all permits and regulatory approvals necessary in the performance of this Agreement. This includes, but shall not be limited to, encroachment permits and building and safety permits and inspections.

20. NOTICES
Any notices, bills, invoices, or reports required by this Agreement shall be deemed received on: (i) the day of delivery if delivered by hand, facsimile, email, or overnight courier service during Consultant’s and City’s regular business hours; or (ii) on the third business day following deposit in the United States mail if delivered by mail, postage prepaid, to the addresses listed below (or to such other addresses as the Parties may, from time to time, designate in writing).

Professional Services Agreement
HARRIS & ASSOCIATES, INC.

Page 10 of 19 ends

If to City: If to Consultant:

Steve Carmona, City Manager
City of Pico Rivera
PO Box 1016
6615 Passons Blvd.

Pico Rivera, California 90660-1016
Facsimile: (562) 801-4765
Alison Bouley, Vice President
Harris & Associates
101 Progress, Suite #250
Irvine, CA 92618
With a courtesy copy to:

Arnold M. Alvarez-Glasman, City Attorney
13181 Crossroads Parkway North
Suite 400 - West Tower
City of Industry, CA 91746
Facsimile: (562) 692-2244

21. SURVIVING COVENANTS
The Parties agree that the covenants contained in Sections 13, 15 and Paragraph

17.2 of Section 17, of this Agreement shall survive the expiration or termination of this Agreement.

22. TERMINATION

22.1. City shall have the right to terminate this Agreement for any reason on five (5) calendar days’ written notice to Consultant. Consultant shall have the right to terminate this Agreement for any reason on sixty (60) calendar days’ written notice to City. The effective date of termination shall be upon the date specified in the notice of termination.

Consultant agrees that in the event of such termination, City’s obligation to pay Consultant shall be limited to payment only for those services satisfactorily rendered, as solely determined by the City, prior to the effective date of termination. Consultant agrees to cease all work under this Agreement on or before the effective date of any notice of termination. All City data, documents, objects, materials or other tangible things shall be returned to City upon the termination or expiration of this Agreement.

22.2 If City terminates this Agreement due to no fault or failure of performance by Consultant, then Consultant shall be paid based on the work satisfactorily performed, as solely determined by the City, at the time of termination. In no event shall Consultant be entitled to receive more than the amount that would be paid to Consultant for the full performance of the services required by this Agreement.

23. ASSIGNMENT
Consultant shall not delegate, transfer, subcontract or assign its duties or rights Professional Services Agreement
HARRIS & ASSOCIATES, INC.

Page 11 of 19 ends

hereunder, either in whole or in part, without City’s prior written consent, and any attempt to do so shall be void and of no effect. City shall not be obligated or liable under this Agreement to any Party other than Consultant.

24. NON-DISCRIMINATION AND EQUAL EMPLOYMENT OPPORTUNITY

24.1 In the performance of this Agreement, Consultant shall not discriminate against any employee, subconsultant, or employment applicant because of race, color, creed, religion, sex, marital status, national origin, ancestry, age, physical or mental handicap, medical condition or sexual orientation. Consultant will take affirmative action to ensure that subconsultants, employees, and employment applicants are treated without regard to their race, color, creed, religion, sex, marital status, national origin, ancestry, age, physical or mental handicap, medical condition or sexual orientation.

24.2 Consultant will, in all solicitations or advertisements for employees placed by or on behalf of Consultant state either that it is an equal opportunity employer or that all qualified applicants will receive consideration for employment without regard to race, color, creed, religion, sex, marital status, national origin, ancestry, age, physical or mental handicap, medical condition or sexual orientation.

24.3 Consultant will cause the foregoing provisions to be inserted in all subcontracts for any work covered by this Agreement except contracts or subcontracts for standard commercial supplies or raw materials.

25. WARRANTIES

25.1 Each Party has received independent legal advice from its attorneys with respect to the advisability of entering into and executing this Agreement, or been provided with an opportunity to receive independent legal advice and has freely and voluntarily waived and relinquished the right to do so. Each Party who has not obtained independent counsel acknowledges that the failure to have independent legal counsel will not excuse such Party’s failure to perform under this Agreement.

25.2 In executing this Agreement, each Party has carefully read this Agreement, knows the contents thereof, and has relied solely on the statements expressly set forth herein and has placed no reliance whatsoever on any statement, representation, or promise of any other party, or any other person or entity, not expressly set forth herein, nor upon the failure of any other party or any other person or entity to make any statement, representation or disclosure of any matter whatsoever.

25.3 It is agreed that each Party has the full right and authority to enter into this Agreement, and that the person executing this Agreement on behalf of either Party has the full right and authority to fully commit and bind such Party to the provisions of this Agreement.

Professional Services Agreement
HARRIS & ASSOCIATES, INC.

Page 12 of 19 ends

26. CAPTIONS

26.1 The captions appearing at the commencement of the sections hereof, and in any paragraph thereof, are descriptive only and for convenience in reference to this Agreement. Should there be any conflict between such heading, and the section or paragraph thereof at the head of which it appears, the section or paragraph thereof, as the case may be, and not such heading, shall control and govern in the construction of this Agreement.

26.2 Masculine or feminine pronouns shall be substituted for the neuter form and vice versa, and the plural shall be substituted for the singular form and vice versa, in any place or places herein in which the context requires such substitution(s).

27. NON-WAIVER

27.1 The waiver by City or Consultant of any breach of any term, covenant or condition herein contained shall not be deemed to be a waiver of such term, covenantor condition or of any subsequent breach of the same or any other term, covenant or condition herein contained. In no event shall the making by City of any payment to Consultant constitute or be construed as a waiver by City of any breach of covenant, or any default which may then exist on the part of Consultant, and the making of any such payment by City shall in no way impair or prejudice any right or remedy available to City with regard to such breach or default. No term, covenant or condition of this Agreement shall be deemed to have been waived by City or Consultant unless in writing.

27.2 Each right, power and remedy provided for herein or now or hereafter existing at law, in equity, by statute, or otherwise shall be cumulative and shall be in addition to every other right, power, or remedy provided for herein or now or hereafter existing at law, in equity, by statute, or otherwise. The exercise, the commencement of the exercise, or the forbearance of the exercise by any Party of any one or more of such rights, powers or remedies shall not preclude the simultaneous or later exercise by such Party of any of all of such other rights, powers or remedies.

27.3 Consultant shall not be liable for any failure to perform if Consultant presents acceptable evidence, in City’s sole judgment, that such failure was due to causes beyond the control and without the fault or negligence of Consultant.

28. COURT COSTS AND ATTORNEY FEES
In the event legal action shall be necessary to enforce any term, covenant or condition herein contained, the Party prevailing in such action, whether reduced to judgment or not, shall be entitled to its reasonable court costs, including accountants’ fees and expert witness fees, if any, and attorneys’ fees expended in such action. The venue for any litigation shall be Los Angeles County, California.

Professional Services Agreement
HARRIS & ASSOCIATES, INC.

Page 13 of 19 ends

29. SEVERABILITY
If any term or provision of this Agreement or the application thereof to any person or circumstance shall, to any extent, be invalid or unenforceable, then such term or provision shall be amended to, and solely to, the extent necessary to cure such invalidity or unenforceability, and in its amended form shall be enforceable. In such event, the remainder of this Agreement, or the application of such term or provision to persons or circumstances other than those as to which it is held invalid or unenforceable, shall not be affected thereby, and each term and provision of this Agreement shall be valid and be enforced to the fullest extent permitted by law.

30. GOVERNING LAW
This Agreement shall be governed and construed in accordance with the laws of the State of California.

31. COUNTERPARTS
This Agreement may be signed in any one or more counterparts all of which taken together shall be but one and the same Agreement. Any signed copy of this Agreement or of any other document or agreement referred to herein, or copy or counterpart thereof, delivered by facsimile or email transmission, shall for all purposes be treated as if it were delivered containing an original manual signature of the Party whose signature appears in the facsimile or email and shall be binding upon such Party in the same manner as though an originally signed copy had been delivered.

32. ENTIRE AGREEMENT
All documents referenced as exhibits in this Agreement are hereby incorporated in this Agreement. In the event of any material discrepancy between the express provisions of this Agreement and the provisions of any document incorporated herein by reference, the provisions of this Agreement shall prevail. This instrument contains the entire Agreement between City and Consultant with respect to the transactions contemplated herein. No other prior oral or written agreements are binding upon the Parties.

Amendments hereto or deviations herefrom shall be effective and binding only if made in writing and executed by City and Consultant.

Professional Services Agreement
HARRIS & ASSOCIATES, INC.

Page 14 of 19 ends

TO EFFECTUATE THIS AGREEMENT, the Parties have caused their duly authorized representatives to execute this Agreement on the dates set forth below. “CITY” “CONSULTANT”
CITY OF PICO RIVERA HARRIS & ASSOCIATES, INC.

Steve Carmona, City Manager Alison Bouley, Vice President Dated: Dated:

ATTEST: APPROVED AS TO FORM:

Cynthia Ayala, CMC, City Clerk Arnold M. Alvarez-Glasman, City Attorney Professional Services Agreement
HARRIS & ASSOCIATES, INC.

Page 15 of 19 ends

EXHIBIT A

SCOPE OF SERVICES
Exhibit A

Professional Services Agreement
HARRIS & ASSOCIATES, INC.

Page 16 of 19 ends

EXHIBIT B

APPROVED FEE SCHEDULE
Professional Services Agreement
HARRIS & ASSOCIATES, INC.

Page 17 of 19 ends

EXHIBIT C

TERMS FOR COMPLIANCE WITH CALIFORNIA LABOR LAW REQUIREMENTS

1. This Agreement calls for services that, in whole or in part, constitute “public works” as defined in Division 2, Part 7, Chapter 1 (commencing with Section 1720) of the California Labor Code (“Chapter 1”). Further, Consultant acknowledges that this Agreement is subject to (a) Chapter 1 and (b) the rules and regulations established by the Department of Industrial Relations (“DIR”) implementing such statutes. Therefore, as to those Services that are “public works”, Consultant shall comply with and be bound by all the terms, rules and regulations described in 1(a) and 1(b) as though set forth in full herein.

2. California law requires the inclusion of specific Labor Code provisions in certain contracts. The inclusion of such specific provisions below, whether or not required by California law, does not alter the meaning or scope of Section 1 above.

3. Consultant shall be registered with the Department of Industrial Relations in accordance with California Labor Code Section 1725.5, and has provided proof of registration to City prior to the Effective Date of this Agreement. Consultant shall not perform work with any subconsultant that is not registered with DIR pursuant to Section 1725.5. Consultant and subconsultants shall maintain their registration with the DIR in effect throughout the duration of this Agreement. If the Consultant or any subconsultant ceases to be registered with DIR at any time during the duration of the project, Consultant shall immediately notify City.

4. Pursuant to Labor Code Section 1771.4, Consultant’s Services are subject to compliance monitoring and enforcement by DIR. Consultant shall post job site notices, as prescribed by DIR regulations.

5. Pursuant to Labor Code Section 1773.2, copies of the prevailing rate of per diem wages for each craft, classification, or type of worker needed to perform the Agreement are on file at City Hall and will be made available to any interested party on request. Consultant acknowledges receipt of a copy of the DIR determination of such prevailing rate of per diem wages, and Consultant shall post such rates at each job site covered by this Agreement.

6. Consultant shall comply with and be bound by the provisions of Labor Code Sections 1774 and 1775 concerning the payment of prevailing rates of wages to workers and the penalties for failure to pay prevailing wages. The Consultant shall, as a penalty to City, forfeit $200.00 for each calendar day, or portion thereof, for each worker paid less than the prevailing rates as determined by the DIR for the work or craft in which the worker is employed for any public work done pursuant to this Agreement by Consultant or by any subconsultant.

7. Consultant shall comply with and be bound by the provisions of Labor Code Professional Services Agreement
HARRIS & ASSOCIATES, INC.

Page 18 of 19 ends

Section 1776, which requires Consultant and each subconsultant to: keep accurate payroll records and verify such records in writing under penalty of perjury, as specified in Section 1776; certify and make such payroll records available for inspection as provided by Section 1776; and inform City of the location of the records.

8. Consultant shall comply with and be bound by the provisions of Labor Code seq. concerning the employment of apprentices on public works projects. Consultant shall be responsible for compliance with these aforementioned Sections for all apprenticeable occupations. Prior to commencing work under this Agreement, Consultant shall provide City with a copy of the information submitted to any applicable apprenticeship program.

Within 60 days after concluding work pursuant to this Agreement, Consultant and each of its subconsultants shall submit to City a verified statement of the journeyman and apprentice hours performed under thisAgreement.

9. The Consultant shall not perform Work with any Subconsultant that has been debarred or suspended pursuant to California Labor Code Section 1777.1 or any other federal or state law providing for the debarment of consultants from public works. The Consultant and Subconsultants shall not be debarred or suspended throughout the duration of this Contract pursuant to Labor Code Section 1777.1 or any other federal or state law providing for the debarment of consultants from public works. If the Consultant or any subconsultant becomes debarred or suspended during the duration of the project, the Consultant shall immediately notify City.

10. Consultant acknowledges that eight hours labor constitutes a legal day’s work. Consultant shall comply with and be bound by Labor Code Section 1810.

Consultant shall comply with and be bound by the provisions of Labor Code Section 1813 concerning penalties for workers who work excess hours. The Consultant shall, as a penalty to City, forfeit $25.00 for each worker employed in the performance of this Agreement by the Consultant or by any subconsultant for each calendar day during which such worker is required or permitted to work more than eight hours in any one calendar day and 40 hours in any one calendar week in violation of the provisions of Division 2, Part 7, Chapter 1, Article 3 of the Labor Code. Pursuant to Labor Code section 1815, work performed by employees of Consultant in excess of eight hours per day, and 40 hours during any one week shall be permitted upon public work upon compensation for all hours worked in excess of eight hours per day at not less than one and one-half times the basic rate of pay.

11. California Labor Code Sections 1860 and 3700 provide that every employer will be required to secure the payment of compensation to its employees. In accordance with the provisions of California Labor Code Section 1861, Consultant hereby certifies as follows:
“I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the Professional Services Agreement
HARRIS & ASSOCIATES, INC.

Page 19 of 19 ends

provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract.”

12. For every subconsultant who will perform work on the project, Consultant shall be responsible for such subconsultant’s compliance with Chapter 1 and Labor Code Sections 1860 and 3700, and Consultant shall include in the written contract between it and each subconsultant a copy of those statutory provisions and a requirement that each subconsultant shall comply with those statutory provisions. Consultant shall be required to take all actions necessary to enforce such contractual provisions and ensure subconsultant’s compliance, including without limitation, conducting a periodic review of the certified payroll records of the subconsultant and upon becoming aware of the failure of the subconsultant to pay his or her workers the specified prevailing rate of wages.

Consultant shall diligently take corrective action to halt or rectify any failure.

13. To the maximum extent permitted by law, Consultant shall indemnify, hold harmless and defend (at Consultant’s expense with counsel reasonably acceptable to City) City, its officials, officers, employees, and staff from and against any demand or claim for damages, compensation, fines, penalties or other amounts to the extent arising out of or incidental to any acts or omissions listed above by Consultant, its subconsultants, and each of their officials, officers, employees and agents in connection with any work undertaken or in connection with the Agreement, including without limitation the payment of all reasonable attorneys’ fees, and other related costs and expenses. All duties of Consultant under this Section shall survive the termination of the Agreement.

To: Mayor and City Council
From: City Manager
Meeting Date: March 26, 2024
Subject: ON-CALL CONSTRUCTION MANAGEMENT AND
INSPECTION SERVICES – AWARD PROFESSIONAL

SERVICES AGREEMENTS
Recommendation:

1. Award a Professional Services Agreement for a term of five (5) years in the total amount of up to $2,500,000 to Willdan Engineering to provide on-call construction management and inspection services;

2. Award a Professional Services Agreement for a term of five (5) years in the total amount of up to $2,500,000 to FCG Consultants, Inc. to provide on-call construction management and inspection services;

3. Award a Professional Services Agreement for a term of five (5) years in the total amount of up to $2,500,000 to Fountainhead Consulting Corporation to provide on-call construction management and inspection services;

4. Award a Professional Services Agreement for a term of five (5) years in the total amount of up to $2,500,000 to GK & Associates to provide on-call construction management and inspection services;

5. Award a Professional Services Agreement for a term of five (5) years in the total amount of up to $2,500,000 to Z&K Consultants, Inc. to provide on-call construction management and inspection services;

6. Award a Professional Services Agreement for a term of five (5) years in the total amount of up to $2,500,000 to AKM Consulting Engineers to provide on-call construction management and inspection services;

7. Award a Professional Services Agreement for a term of five (5) years in the total amount of up to $2,500,000 to Gannett Fleming to provide on-call construction management and inspection services;
9 CITY COUNCIL AGENDA REPORT – MEETING OF MARCH 26, 2024 ON-CALL CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES –

AWARD PROFESSIONAL SERVICES AGREEMENTS

Page 2 of 4 ends

8. Award a Professional Services Agreement for a term of five (5) years in the total amount of up to $2,500,000 to Southstar Engineering and Consulting, Inc. to provide on-call construction management and inspection services;

9. Award a Professional Services Agreement for a term of five (5) years in the total amount of up to $2,500,000 to NV5, Inc. to provide on-call construction management and inspection services;

10.Award a Professional Services Agreement for a term of five (5) years in the total amount of up to $2,500,000 to Pacifica Services, Inc. to provide on-call construction management and inspection services; and

11. Authorize the City Manager to execute the agreements in a form approved by the City Attorney.

Fiscal Impact:

The contract amount for each firm is not-to-exceed $2,500,000 for a term of five (5) years to provide construction management services and inspection services. No Purchase Orders (PO) will be opened upon execution of these agreements. The Engineering Division will process POs on an as-needed basis with selected firms to provide the construction management and inspection services. It is anticipated that future work may be awarded to any of the consulting firms, depending on their competitive task proposals that they will submit on a project-by-project basis. Accounts for the PO’s will be established based on the task-order and project-appropriated funding source(s) associated with each City capital project assigned to the consulting firm. Funding will be based on appropriations approved for each project’s budget, with funds such as Local Return Funds, applicable State grants and budgeted General Fund.

Discussion:

As has previously been the case, the Public Works Department requires construction management and inspections services for various Capital Improvement Projects (CIP).

Due to current staffing levels, the Department does not currently have available resources to administer and inspect CIPs. To provide readily available and qualified resources, staff recommend the procurement of qualified consultants to provide on-call construction management and inspection services. Typical services provided under this procurement include construction administration, inspection, material testing and labor compliance for roadway pavement rehabilitation and/or restoration, streetscape, landscaping and irrigation systems, utility, bridges, safety lighting, traffic signal, water treatment and distribution systems, sewer systems, flood control and storm drain facilities, parks, general facilities and other Public Works construction projects. All services will be provided on an as-needed basis.

CITY COUNCIL AGENDA REPORT – MEETING OF MARCH 26, 2024
ON-CALL CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES –

AWARD PROFESSIONAL SERVICES AGREEMENTS

Page 3 of 4 ends

A Request for Proposals (RFP) for on-call construction management and inspection services was posted on PlanetBids through the City’s website on January 3, 2024. On February 7, 2024, the City received proposals from 28 firms in response to the RFP. A panel of three (3) staff members from the Public Works Department independently reviewed the proposals submitted by each firm and scored them based on the qualifications criteria prescribed in the RFP.

A summary of the final ranking of each firm is presented below:

Ranking Consulting Firm Ranking Consulting Firm
1 WILLDAN 15 BUREAU VERITAS
2 FCG CONSULTANTS 16 TYR, INC.
3 FOUNTAIN HEAD 17 TRANSTECH
4 GK & ASSOCIATES 18 RKA CONSULTING GROUP
5 Z&K CONSULTANTS, INC. 19 RAMOS CS ENGINEERING
6 AKM CONSULTING ENGINEERS 20 ATLAS
7 GANNETT FLEMING 21 PACIFIC PROS
8 SOUTHSTAR ENGINEERING 22 DUDEK
9 NV5 23 GHIRADELLI ASSOCIATES
10 PACIFICA 24 TRC
11 TKE ENGINEERING, INC. 25 KANE CONSTRUCTION
12 ONWARD ENGINEERING 26 P2S, INC.
13 SA ASSOCIATES 27 LADAYU CONSULTING GROUP
14 MURROW DEVELOPMENT 28 FEI ASSOCIATES
In order to maximize the City’s flexibility, staff recommend awarding contracts to 10 firms to provide construction management and inspection services. The recommended firms are Willdan Engineering, FCG Consultants, Inc., Fountainhead Consulting Corporation, GK & Associates, Z&K Consultants, Inc., AKM Consulting Engineers, Gannett Fleming, Southstar Engineering and Consulting, Inc., NV5, Inc. and Pacifica Services, Inc. The City reserves the right to assign projects to one or more of the consultants at its sole discretion based on project requirements, the requirements of the funding source for the project, as well as the availability and ability of each consultant.

Selection of a firm does not necessarily guarantee the award of work of any specific contract value.

Conclusion:

Staff recommends selecting the following 10 firms: 1) Willdan Engineering; 2) FCG Consultants, Inc.; 3) Fountainhead Consulting Corporation; 4) GK & Associates; 5) Z&K Consultants, Inc.; 6) AKM Consulting Engineers; 7) Gannett Fleming; 8) Southstar Engineering and Consulting, Inc.; 9) NV5, Inc.; and 10) Pacifica Services, Inc. to provide on-call construction management and inspection services. The Professional Service CITY COUNCIL AGENDA REPORT – MEETING OF MARCH 26, 2024
ON-CALL CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES –

AWARD PROFESSIONAL SERVICES AGREEMENTS

Page 4 of 4 ends

Agreements are for a term of five (5) years for an amount of up to $2,500,000 each.

The selected qualified firms will be available to provide services on an as-needed basis for construction management services in the delivery of a variety of projects. These firms may be contacted during the term of the agreement to provide a fee proposal for individual task orders and in accordance with the procedural requirements of the funding source for each project.

Steve Carmona
SC:NN:KG:np
Enclosures: 1) Professional Services Agreement – Willdan Engineering. 2) Professional Services Agreement – FCG Consultants, Inc. 3) Professional Services Agreement – Fountainhead Consulting Corporation
4) Professional Services Agreement – GK & Associates
5) Professional Services Agreement – Z&K Consultants, Inc. 6) Professional Services Agreement – AKM Consulting Engineers 7) Professional Services Agreement – Gannett Fleming
8) Professional Services Agreement – Southstar Engineering and Consulting, Inc
9) Professional Services Agreement – NV5, Inc
10)Professional Services Agreement – Pacifica Services, Inc.

AGREEMENT NO. _______

PROFESSIONAL SERVICES AGREEMENT

BETWEEN THE CITY OF PICO RIVERA AND

WILLDAN ENGINEEERING

1. IDENTIFICATION
THIS PROFESSIONAL SERVICES AGREEMENT (“Agreement”) is entered into by and between the City of Pico Rivera, a California municipal corporation (“City”) and Willdan Engineering, (“Consultant”). City and Consultant are sometimes hereinafter individually referred to as a “Party” and collectively referred to as “Parties.”

2. RECITALS

2.1 City has determined that it requires professional services from a consultant to provide on-call construction management services.

2.2 Consultant represents that it is fully qualified to perform such professional services by virtue of its experience and the training, education and expertise of its principals and employees. Consultant further represents that it is willing to accept responsibility for performing such services in accordance with the terms and conditions set forth in this Agreement.

NOW, THEREFORE, for and in consideration of the performance by the Parties of the mutual covenants and conditions herein contained, the Parties hereto agree as follows:

3. DEFINITIONS

3.1 “Scope of Services”: Such professional services as are set forth in the Consultant’s February 7, 2024 proposal to City attached hereto as Exhibit “A” and incorporated herein by this reference.

3.2 “Approved Fee Schedule”: Such compensation rates as are set forth in the Consultant’s February 7, 2024 proposal to City attached hereto as Exhibit “B.”

3.3 “Commencement Date” : March 26, 2024

3.4 “Expiration Date” : June 30, 2029

4. TERM
The term of this Agreement shall commence at 12:00 a.m. on the Commencement Date and shall expire at 11:59 p.m. on the Expiration Date unless extended by written agreement of the Parties or terminated in accordance with Section 22 below.

Enclosure 1
9a
Professional Services Agreement

WILLDAN ENGINEERING

Page 2 of 19 ends

5. CONSULTANT’S SERVICES

5.1 Consultant shall perform the services identified in the Scope of Services. City shall have the right to request, in writing, changes in the Scope of Services. Any such changes mutually agreed upon by the Parties, and any corresponding increase or decrease in compensation, shall be incorporated by written amendment to this Agreement. In no event shall the total compensation and costs payable to Consultant under this Agreement exceed the sum of $2,500,000, Two Million Five Hundred Thousand Dollars, unless specifically approved in advance, in writing, by City.

5.2 Consultant shall perform all work to the highest professional standards of Consultant’s profession and in a manner reasonably satisfactory to City.

6. COMPENSATION

6.1 City agrees to compensate Consultant for the services provided under this Agreement, and Consultant agrees to accept in full satisfaction for such services, payment in accordance with the Approved Fee Schedule.

6.2 Consultant shall submit to City an invoice, on a monthly basis or less frequently, for the services performed pursuant to this Agreement. Each invoice shall itemize the services rendered during the billing period and the amount due. Within ten (10) business days of receipt of each invoice, City shall notify Consultant in writing of any disputed amounts included on the invoice. Within thirty (30) calendar days of receipt of each invoice, City shall pay all undisputed amounts included on the invoice. City shall not withhold applicable taxes or other authorized deductions from payments made to Consultant.

6.3 Payments for any services requested in writing by City and not included in the Scope of Services shall be made to Consultant by City on a time-and-materials basis using Consultant’s standard fee schedule. Fees for such additional services shall be paid within sixty (60) days of the date Consultant issues an invoice to City for such services.

7. BUSINESS LICENSE
Consultant shall obtain a City of Pico Rivera business license prior to commencing performance under this Agreement.

8. COMPLIANCE WITH LAWS
Consultant shall keep informed of State, Federal and Local laws, ordinances, codes and regulations that in any manner affect those employed by it or in any way affect the performance of its services pursuant to this Agreement. Consultant shall at all times comply with such laws, ordinances, codes and regulations. Without limiting the generality Professional Services Agreement

WILLDAN ENGINEERING

Page 3 of 19 ends

of the foregoing, if Consultant is an out-of-state corporation or LLC, it must be qualified and registered to do business in the State of California pursuant to sections 2105 and 17708.02 of the California Corporations Code. The City, its officers and employees shall not be liable at law or in equity occasioned by failure of Consultant to comply with this Section.

9. CONFLICT OF INTEREST
Consultant covenants that it presently has no interest and shall not acquire any interest, direct or indirect, which may be affected by the services to be performed by Consultant under this Agreement, or which would conflict in any manner with the performance of its services hereunder. During the term of this Agreement, Consultant shall not perform any work for another person or entity for whom Consultant was not working at the Commencement Date of this Agreement if both: (i) such work would require Consultant to abstain from a decision under this Agreement pursuant to a conflict of interest statute; and (ii) City has not consented in writing prior to Consultant’s performance of such work.

10. PERSONNEL
Consultant represents that it has, or will secure at its own expense, all personnel required to perform the services identified in the Scope of Services. All such services shall be performed by Consultant or under its supervision, and all personnel engaged in the work shall be qualified to perform such services. Consultant reserves the right to determine the assignment of its own employees to the performance of Consultant’s services under this Agreement, but City reserves the right, for good cause, to require Consultant to exclude any employee from performing services on City’s premises. Chris Baca, Director of Construction Management, shall be Consultant’s project administrator and shall have direct responsibility for management of Consultant’s performance under this Agreement. No change shall be made to Consultant’s project administrator without City’s prior written consent.

11. OWNERSHIP OF WRITTEN PRODUCTS
All reports, documents or other written material (“written products”) developed by Consultant in the performance of this Agreement shall be and remain the property of City without restriction or limitation upon its use or dissemination by City. Consultant may take and retain copies of such written products as desired, but no such written products shall be the subject of a copyright application by Consultant. If any state, federal, or local law requires mandatory copyright protection for Consultant’s work product, City shall comply with such laws to the extent feasible.

Professional Services Agreement

WILLDAN ENGINEERING

Page 4 of 19 ends

12. INDEPENDENT CONSULTANT

12.1 Consultant is, and shall at all times remain as to City, a wholly independent consultant. Consultant shall have no power to incur any debt, obligation, or liability on behalf of City or otherwise to act on behalf of City as an agent. Neither City nor any of its officers, employees or agents shall have control over the conduct of Consultant or any of Consultant’s employees, except as set forth in this Agreement. Consultant shall not at any time represent that it is, or that any of its agents or employees are, in any manner employees of City. 12.2 The Parties further acknowledge and agree that nothing in this Agreement shall create or be construed to create a partnership, joint venture, employment relationship, joint-employer relationship, or any other relationship between Consultant or Consultant’s employees except as set forth in this Agreement.

12.2 City shall have no direct or indirect control over Consultant’s employees or sub-consultants with respect to wages, hours, and working conditions. In addition, City shall not deduct from the Compensation paid to Consultant any sums required for Social Security, withholding taxes, FICA, state disability insurance or any other federal, state or local tax or charge which may or may not be in effect or hereinafter enacted or required as a charge or withholding on the compensation paid to Consultant, Consultant’s employees or subconsultants. City shall have no responsibility to provide Consultant, its employees or subconsultants with workers’ compensation insurance or any other insurance.

13. CONFIDENTIALITY
All data, documents, discussion, or other information developed or received by Consultant or provided for performance of this Agreement are deemed confidential and shall not be disclosed by Consultant without prior written consent by City. City shall grant such consent if disclosure is legally required. Upon request, all City data and any copies thereof shall be returned to City upon the termination or expiration of this Agreement.

14. NON-LIABILITY OF CITY OFFICIALS AND EMPLOYEES
No official or employee of the City shall be personally liable to Consultant in the event of any default or breach by City, or for any amount which may become due to Consultant.

15. INDEMNIFICATION

15.1 The Parties agree that City, its officers, agents, elected and appointed officials, employees, affiliated public agencies and volunteers should, to the extent permitted by law, be fully protected from any loss, injury, damage, claim, lawsuit, cost, expense, attorneys’ fees, litigation costs, or any other cost arising out of or in any way related to the performance of this Agreement. Accordingly, the provisions of this indemnity provision are intended by the Parties to be interpreted and construed to provide the fullest Professional Services Agreement

WILLDAN ENGINEERING

Page 5 of 19 ends

protection possible under the law to City. Consultant acknowledges that City would not enter into this Agreement in the absence of Consultant’s commitment to indemnify and protect City as set forth herein. Notwithstanding the foregoing, to the extent Consultant's services are subject to Civil Code Section 2782.8, the above indemnity shall be limited, to the extent required by Civil Code Section 2782.8, to claims that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant.

15.2 To the full extent permitted by law, Consultant shall indemnify, hold harmless and defend City, its officers, agents, elected and appointed officials, employees, affiliated public agencies and volunteers from and against any and all claims, demands, lawsuits, causes of action, losses, costs or expenses for any damage due to death or injury to any person and injury to any property resulting from or arising out of any alleged intentional, reckless, negligent, or otherwise wrongful acts, errors or omissions of Consultant or any of its officers, employees, servants, agents, or subconsultants in the performance of this Agreement. Such costs and expenses shall include reasonable attorneys’ fees incurred by counsel of City’s choice and expert witness fees and consultant fees. Notwithstanding the foregoing, to the extent Consultant's Services are subject to Civil Code Section 2782.8, the above indemnity shall be limited, to the extent required by Civil Code Section 2782.8, to claims that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant.

15.3 City shall have the right to offset against the amount of any compensation due Consultant under this Agreement any amount due to City from Consultant as a result of Consultant’s failure to pay City promptly any indemnification arising under this Section 15 or related to Consultant’s failure to either: (i) pay taxes on amounts received pursuant to this Agreement or (ii) comply with applicable workers’ compensation laws.

15.4 The obligations of Consultant under this Section 15 will not be limited by the provisions of any workers’ compensation act or similar act. Consultant expressly waives its statutory immunity under such statutes or laws as to City, its officers, agents, employees and volunteers.

15.5 Consultant agrees to obtain executed indemnity agreements with provisions identical to those set forth here in this Section 15 from each and every subconsultant or any other person or entity involved by, for, with or on behalf of Consultant in the performance of this Agreement. In the event Consultant fails to obtain such indemnity obligations from others as required herein, Consultant agrees to be fully responsible and indemnify, hold harmless and defend City, its officers, agents, elected and appointed officials, employees, affiliated public agencies and volunteers from and against any and all claims, demands, lawsuits, causes of action, losses, costs or expenses for any damage due to death or injury to any person and injury to any property resulting from or arising out of any alleged intentional, reckless, negligent, or otherwise wrongful acts, errors or omissions of Consultant’s subconsultants or any other person or entity involved Professional Services Agreement

WILLDAN ENGINEERING

Page 6 of 19 ends

by, for, with or on behalf of Consultant in the performance of this Agreement. Such costs and expenses shall include reasonable attorneys’ fees incurred by counsel of City’s choice and expert witness fees and consultant fees.

15.6 City does not, and shall not, waive any rights that it may possess against Consultant because of the acceptance by City, or the deposit with City, of any insurance policy or certificate required pursuant to this Agreement. This hold harmless and indemnification provision shall apply regardless of whether or not any insurance policies are determined to be applicable to the claim, demand, damage, liability, loss, cost or expense.

15.7 PERS ELIGIBILITY INDEMNITY. In the event that Consultant or any employee, agent, or subconsultant of Consultant providing services under this Agreement claims or is determined by a court of competent jurisdiction or the California Public Employees Retirement System (PERS) to be eligible for enrollment in PERS as an employee of the City, Consultant shall indemnify, defend, and hold harmless City for the payment of any employee and/or employer contributions for PERS benefits on behalf of Consultant or its employees, agents, or subconsultants, as well as for the payment of any penalties and interest on such contributions, which would otherwise be the responsibility of City.

Notwithstanding any other agency, state or federal policy, rule, regulation, law or ordinance to the contrary, Consultant and any of its employees, agents, and subconsultants providing service under this Agreement shall not qualify for or become entitled to, and hereby agree to waive any claims to, any compensation, benefit, or any incident of employment by City, including but not limited to eligibility to enroll in PERS as an employee of City and entitlement to any contribution to be paid by City for employer contribution and/or employee contributions for PERS benefits.

16. INSURANCE

16.1 During the term of this Agreement, Consultant shall carry, maintain, and keep in full force and effect insurance against claims for death or injuries to persons or damages to property that may arise from or in connection with Consultant’s performance of this Agreement. Such insurance shall be of the types and in the amounts as set forth below:

16.1.1 Comprehensive general liability, and Umbrella or Excess Liability Insurance covering all operations by or on behalf of Consultant providing insurance for bodily injury liability and property damage liability for the following and including coverage for:

16.1.1.1 Premises, operations, and mobile equipment

16.1.1.2 Products and completed operations
Professional Services Agreement

WILLDAN ENGINEERING

Page 7 of 19 ends

16.1.1.3 Broad form property damage (including completed operations)

16.1.1.4 Explosion, collapse, and underground hazards

16.1.1.5 Personal Injury

16.1.1.6 Contractual liability
in the amount of One Million Dollars ($1,000,000) per occurrence combined single limit; Two Million Dollars ($2,000,000) aggregate for products/completed operation; Two Million Dollars ($2,000,000) general aggregate (General aggregate must apply separately to Consultant’s work under this Agreement.); and Five Million Dollars ($5,000,000) umbrella or excess liability.

16.1.2 Automobile Liability Insurance for owned, hired and non-owned vehicles utilized by Consultant, its employees or subconsultants, in the amount of One Million Dollars ($1,000,000) per accident for bodily injury and property damage.

16.1.3 Worker’s Compensation Insurance as required by the laws of the State of California, with Statutory Limits, and Employer's Liability Insurance with limit of no less than One Million Dollars ($1,000,000) per accident for bodily injury or disease.

16.1.4 Professional Liability Insurance against errors and omissions in the performance of the work under this Agreement with coverage limits of not less than One Million Dollars ($1,000,000) per occurrence of claim/ Two Million Dollars ($2,000,000) in the aggregate.

16.2 Consultant shall require each of its subconsultants, if any, to maintain insurance coverage that meets all of the requirements of this Agreement.

16.3 The policy or policies required by this Agreement shall be issued by an insurer admitted in the State of California and with a rating of at least A:VII in the latest edition of Best’s Insurance Guide.

16.4 Consultant agrees that if it does not keep the aforesaid insurance in full force and effect City may either: (i) immediately terminate this Agreement; or (ii) take out the necessary insurance and pay, at Consultant’s expense, the premium thereon.

16.5 At all times during the term of this Agreement, Consultant shall maintain on file with City’s Risk Manager a certificate or certificates of insurance showing that the aforesaid policies are in effect in the required amounts and, for the general liability and automobile liability policies, naming the City as an additional insured. Consultant shall, prior to commencement of work under this Agreement, file with City’s Risk Manager such Professional Services Agreement

WILLDAN ENGINEERING

Page 8 of 19 ends

certificate(s).

16.6 Consultant shall provide proof that policies of insurance required herein expiring during the term of this Agreement have been renewed or replaced with other policies providing at least the same coverage. Consultant shall provide such proof to City at least two weeks prior to the expiration of the coverages.

16.7 The general liability and automobile policies of insurance required by this Agreement shall contain an endorsement naming City, its officers, employees, agents and volunteers as additional insureds. All of the policies required under this Agreement shall contain an endorsement providing that the policies cannot be canceled or reduced except on thirty days’ prior written notice to City. Consultant agrees to require its insurer to modify the certificates of insurance to delete any exculpatory wording stating that failure of the insurer to mail written notice of cancellation imposes no obligation, and to delete the word “endeavor” with regard to any notice provisions.

16.8 The general liability and automobile policies of insurance provided by Consultant shall be primary to any coverage available to City. Any insurance or selfinsurance maintained by City, its officers, employees, agents or volunteers, shall be in excess of Consultant’s insurance and shall not contribute with it.

16.9 All insurance coverage provided pursuant to this Agreement shall not prohibit Consultant, and Consultant’s employees, agents or subconsultants, from waiving the right of subrogation prior to a loss. Consultant hereby waives all rights of subrogation against the City.

16.10 Any deductibles or self-insured retentions must be declared to and approved by the City. At the option of City, Consultant shall either reduce or eliminate the deductibles or self-insured retentions with respect to City, or Consultant shall procure a bond guaranteeing payment of losses and expenses.

16.11 Procurement of insurance by Consultant shall not be construed as a limitation of Consultant’s liability or as full performance of Consultant’s duties to indemnify, hold harmless and defend under Section 15 of this Agreement.

16.12 If Consultant maintains broader coverage and/or higher limits than the minimums shown above, the City requires and shall be entitled to the broader coverage and/or the higher limits maintained by the Consultant. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City.

17. MUTUAL COOPERATION

17.1 City shall provide Consultant with all pertinent data, documents and other requested information as is reasonably available to City for the proper performance of Consultant’s services under this Agreement.

Professional Services Agreement

WILLDAN ENGINEERING

Page 9 of 19 ends

17.2 In the event any claim or action is brought against City relating to Consultant’s performance in connection with this Agreement, Consultant shall render any reasonable assistance that City may require.

18. RECORDS AND INSPECTIONS
Consultant shall maintain full and accurate records with respect to all matters covered under this Agreement for a period of three years after the expiration or termination of this Agreement. City shall have the right to access and examine such records, without charge, during normal business hours. City shall further have the right to audit such records, to make transcripts therefrom and to inspect all program data, documents, proceedings, and activities.

19. PERMITS AND APPROVALS
Consultant shall obtain, at its sole cost and expense, all permits and regulatory approvals necessary in the performance of this Agreement. This includes, but shall not be limited to, encroachment permits and building and safety permits and inspections.

20.NOTICES
Any notices, bills, invoices, or reports required by this Agreement shall be deemed received on: (i) the day of delivery if delivered by hand, facsimile, email, or overnight courier service during Consultant’s and City’s regular business hours; or (ii) on the third business day following deposit in the United States mail if delivered by mail, postage prepaid, to the addresses listed below (or to such other addresses as the Parties may, from time to time, designate in writing).

If to City: If to Consultant:

Steve Carmona, City Manager
City of Pico Rivera
PO Box 1016
6615 Passons Blvd.

Pico Rivera, California 90660-1016
Vanessa Munoz, President and
Director of Engineering
Willdan Engineering
13191 Crossroads Pkwy North,
Suite 405
Industry, CA 91746
With a courtesy copy to:

Arnold M. Alvarez-Glasman, City Attorney
13181 Crossroads Parkway North
Suite 400 - West Tower
City of Industry, CA 91746
Professional Services Agreement

WILLDAN ENGINEERING

Page 10 of 19 ends

21. SURVIVING COVENANTS
The Parties agree that the covenants contained in Sections 13, 15 and Paragraph

17.2 of Section 17, of this Agreement shall survive the expiration or termination of this Agreement.

22. TERMINATION

22.1 City shall have the right to terminate this Agreement for any reason on five (5) calendar days’ written notice to Consultant. Consultant shall have the right to terminate this Agreement for any reason on sixty (60) calendar days’ written notice to City. The effective date of termination shall be upon the date specified in the notice of termination.

Consultant agrees that in the event of such termination, City’s obligation to pay Consultant shall be limited to payment only for those services satisfactorily rendered, as solely determined by the City, prior to the effective date of termination. Consultant agrees to cease all work under this Agreement on or before the effective date of any notice of termination. All City data, documents, objects, materials or other tangible things shall be returned to City upon the termination or expiration of this Agreement.

22.2 If City terminates this Agreement due to no fault or failure of performance by Consultant, then Consultant shall be paid based on the work satisfactorily performed, as solely determined by the City, at the time of termination. In no event shall Consultant be entitled to receive more than the amount that would be paid to Consultant for the full performance of the services required by this Agreement.

23. ASSIGNMENT
Consultant shall not delegate, transfer, subcontract or assign its duties or rights hereunder, either in whole or in part, without City’s prior written consent, and any attempt to do so shall be void and of no effect. City shall not be obligated or liable under this Agreement to any Party other than Consultant.

24. NON-DISCRIMINATION AND EQUAL EMPLOYMENT OPPORTUNITY

24.1 In the performance of this Agreement, Consultant shall not discriminate against any employee, subconsultant, or employment applicant because of race, color, creed, religion, sex, marital status, national origin, ancestry, age, physical or mental handicap, medical condition or sexual orientation. Consultant will take affirmative action to ensure that subconsultants, employees, and employment applicants are treated without regard to their race, color, creed, religion, sex, marital status, national origin, ancestry, age, physical or mental handicap, medical condition or sexual orientation.

24.2 Consultant will, in all solicitations or advertisements for employees placed by or on behalf of Consultant state either that it is an equal opportunity employer or that all qualified applicants will receive consideration for employment without regard to race, Professional Services Agreement

WILLDAN ENGINEERING

Page 11 of 19 ends

color, creed, religion, sex, marital status, national origin, ancestry, age, physical or mental handicap, medical condition or sexual orientation.

24.3 Consultant will cause the foregoing provisions to be inserted in all subcontracts for any work covered by this Agreement except contracts or subcontracts for standard commercial supplies or raw materials.

25. WARRANTIES

25.1 Each Party has received independent legal advice from its attorneys with respect to the advisability of entering into and executing this Agreement, or been provided with an opportunity to receive independent legal advice and has freely and voluntarily waived and relinquished the right to do so. Each Party who has not obtained independent counsel acknowledges that the failure to have independent legal counsel will not excuse such Party’s failure to perform under this Agreement.

25.2 In executing this Agreement, each Party has carefully read this Agreement, knows the contents thereof, and has relied solely on the statements expressly set forth herein and has placed no reliance whatsoever on any statement, representation, or promise of any other party, or any other person or entity, not expressly set forth herein, nor upon the failure of any other party or any other person or entity to make any statement, representation or disclosure of any matter whatsoever.

25.3 It is agreed that each Party has the full right and authority to enter into this Agreement, and that the person executing this Agreement on behalf of either Party has the full right and authority to fully commit and bind such Party to the provisions of this Agreement.

26. CAPTIONS

26.1 The captions appearing at the commencement of the sections hereof, and in any paragraph thereof, are descriptive only and for convenience in reference to this Agreement. Should there be any conflict between such heading, and the section or paragraph thereof at the head of which it appears, the section or paragraph thereof, as the case may be, and not such heading, shall control and govern in the construction of this Agreement.

26.2 Masculine or feminine pronouns shall be substituted for the neuter form and vice versa, and the plural shall be substituted for the singular form and vice versa, in any place or places herein in which the context requires such substitution(s).

Professional Services Agreement

WILLDAN ENGINEERING

Page 12 of 19 ends

27. NON-WAIVER

27.1 The waiver by City or Consultant of any breach of any term, covenant or condition herein contained shall not be deemed to be a waiver of such term, covenant or condition or of any subsequent breach of the same or any other term, covenant or condition herein contained. In no event shall the making by City of any payment to Consultant constitute or be construed as a waiver by City of any breach of covenant, or any default which may then exist on the part of Consultant, and the making of any such payment by City shall in no way impair or prejudice any right or remedy available to City with regard to such breach or default. No term, covenant or condition of this Agreement shall be deemed to have been waived by City or Consultant unless in writing.

27.2 Each right, power and remedy provided for herein or now or hereafter existing at law, in equity, by statute, or otherwise shall be cumulative and shall be in addition to every other right, power, or remedy provided for herein or now or hereafter existing at law, in equity, by statute, or otherwise. The exercise, the commencement of the exercise, or the forbearance of the exercise by any Party of any one or more of such rights, powers or remedies shall not preclude the simultaneous or later exercise by such Party of any of all of such other rights, powers or remedies.

27.3 Consultant shall not be liable for any failure to perform if Consultant presents acceptable evidence, in City’s sole judgment, that such failure was due to causes beyond the control and without the fault or negligence of Consultant.

28. COURT COSTS AND ATTORNEY FEES
In the event legal action shall be necessary to enforce any term, covenant or condition herein contained, the Party prevailing in such action, whether reduced to judgment or not, shall be entitled to its reasonable court costs, including accountants’ fees and expert witness fees, if any, and attorneys’ fees expended in such action. The venue for any litigation shall be Los Angeles County, California.

29. SEVERABILITY
If any term or provision of this Agreement or the application thereof to any person or circumstance shall, to any extent, be invalid or unenforceable, then such term or provision shall be amended to, and solely to, the extent necessary to cure such invalidity or unenforceability, and in its amended form shall be enforceable. In such event, the remainder of this Agreement, or the application of such term or provision to persons or circumstances other than those as to which it is held invalid or unenforceable, shall not be affected thereby, and each term and provision of this Agreement shall be valid and be enforced to the fullest extent permitted by law.

Professional Services Agreement

WILLDAN ENGINEERING

Page 13 of 19 ends

30. GOVERNING LAW
This Agreement shall be governed and construed in accordance with the laws of the State of California.

31. COUNTERPARTS
This Agreement may be signed in any one or more counterparts all of which taken together shall be but one and the same Agreement. Any signed copy of this Agreement or of any other document or agreement referred to herein, or copy or counterpart thereof, delivered by facsimile or email transmission, shall for all purposes be treated as if it were delivered containing an original manual signature of the Party whose signature appears in the facsimile or email and shall be binding upon such Party in the same manner as though an originally signed copy had been delivered.

32. ENTIRE AGREEMENT
All documents referenced as exhibits in this Agreement are hereby incorporated in this Agreement. In the event of any material discrepancy between the express provisions of this Agreement and the provisions of any document incorporated herein by reference, the provisions of this Agreement shall prevail. This instrument contains the entire Agreement between City and Consultant with respect to the transactions contemplated herein. No other prior oral or written agreements are binding upon the Parties.

Amendments hereto or deviations herefrom shall be effective and binding only if made in writing and executed by City and Consultant.
[This space is intentionally left blank]
Professional Services Agreement

WILLDAN ENGINEERING

Page 14 of 19 ends

TO EFFECTUATE THIS AGREEMENT, the Parties have caused their duly authorized representatives to execute this Agreement on the dates set forth below. “CITY” “CONSULTANT”

CITY OF PICO RIVERA WILLDAN ENGINEERING
______________________________ ___________________________________ Andrew C. Lara, Mayor Vanessa Munoz, President and
Director of Engineering
Dated: ________________________ Dated: _____________________________ ATTEST: APPROVED AS TO FORM:
___________________________ ___________________________________ Cynthia Ayala, City Clerk Arnold M. Alvarez-Glasman, City Attorney Professional Services Agreement

WILLDAN ENGINEERING

Page 15 of 19 ends

EXHIBIT A

SCOPE OF SERVICES
City of Pico Rivera
Proposal
On-Call Construction Management and
Inspection Services
February 7, 2024
Letter of Offer
February 7, 2024
Attn: Noe Negrete
Director of Public Works
City of Pico Rivera
6615 Passons Blvd
Pico Rivera, CA 90660
Subject: Proposal for On-Call Construction Management and Inspection Services The City of Pico Rivera is seeking qualified firms to provide general Construction Management and Inspection Services on an as-needed or on-call basis.

Willdan Engineering (Willdan), a California corporation since May 1964, is a subsidiary of Willdan Group, Inc., a publicly traded Delaware corporation. Willdan has the resources, staff, and experience to meet the City’s needs. In addition to its team of resident engineers, construction managers, and construction inspectors based in Los Angeles County, Willdan has assembled a team who are committed to providing top-quality services to the City of Pico Rivera. We believe that we are highly qualified to undertake this assignment because of strong project management, experienced team, and our working knowledge of the City’s policies and procedures.

As a municipal consulting firm, we are aware of the City’s needs and desires in undertaking a contract of this type. Willdan’s personnel are experienced in working as an integral part of agency staff and, therefore, are familiar with city standards, guidelines, and procedures. This knowledge and experience will allow Willdan to be most responsive to your requirements. As a multidisciplinary firm, we have a full complement of resources under one roof to provide thorough construction management and inspection services.

Our firm’s strengths include the following:
 Local Knowledge. Our proposed team members are highly familiar with the City’s policies and procedures, funding sources, and state and federal guidelines and standards. This knowledge and experience enable us to quickly initiate projects and respond appropriately to City staff input and/or concerns. Willdan is currently providing construction management services for the City’s PFAS Treatment, Regional Bikeway, Senior and Youth Centers, and Major Corridors Projects. In addition, Willdan continues to provide similar projects to the nearby cities of Bellflower, Paramount, Norwalk, Long Beach, and Downey.
 Highly skilled Contract Manager. Mr. Chris Baca, RCI offers over 40 years of construction management and public works experience and has been administering Willdan’s current on-call agreement for the past 5 years.
 Staffing Resources. Our bench of licensed and technical experts consists of specialists in construction management, construction observation, water resources, highway and roadway engineering, drainage and flood control, structural engineering, traffic and transportation engineering, geotechnical engineering and materials testing/inspection, municipal engineering, landscape architecture, environmental planning, building safety, urban and regional planning, and other technical fields. The breadth and diversity of the firm’s expertise means our construction management experts can draw upon the considerable experience of the firm – maximizing efficiency, productivity, and quality in meeting project schedules and budgets.  Turnkey Service. Willdan offers the City of Pico Rivera a construction management staff experienced in a broad range of capital improvement projects, including roadway rehabilitation, parks, buildings, streetscape, traffic signalization, and wet utility (storm drain and sanitary sewer) modification, rehabilitation, replacement, and new installation improvements.

For this proposal, the contact person who will be authorized to make representations for the Willdan team is Mr. Chris Baca, Director of Construction Management and Inspection at the following address:

Willdan Engineering
13191 Crossroads Parkway North, Suite 405, Industry, CA 91746 Phone: (310) 502-6335 email: [email protected]
Willdan’s Federal Tax ID is 95-2295858. This proposal shall remain valid for a period of not less than 90 calendar days from the date of submittal. Willdan is obligated by all addenda to this RFP and Willdan attests that all information submitted with this proposal is true and correct.

Respectfully submitted,

WILLDAN ENGINEERING
Vanessa Muñoz, PE, TE
President and Director of Engineering
Proposal for Construction Management
And Inspection Services 1
City of Pico Rivera – Proposal for On-Call Construction Management and Inspection Services Qualifications of the Firm
Willdan Engineering (Willdan), a California corporation since May 1964, is a subsidiary of Willdan Group, Inc., a publicly traded Delaware corporation. Services are provided to nationwide clientele through three subsidiary firms – Willdan Engineering, Willdan Energy Solutions, and Willdan Financial Services – that offer a portfolio of diversified strengths. Willdan infuses a corporate culture of Customer-First throughout our entire staffing resources and all services provided to our clients. Looking out for our clients’ best interests is at the forefront of everything we do.

Our services and in-house support disciplines encompass urban and regional planning; traffic, civil, structural, geotechnical, right-of-way, city, and special district engineering; program/construction management and inspection; plan, study, and report review; building safety; drainage and flood control; mapping; and other complementary services such as GIS, utility coordination and relocation, and landscape architecture. With this depth of experience, expertise, knowledge, and resources, Willdan offers comprehensive solutions that are timely, cost effective, and tailored to meet the needs of individual communities. Our understanding of public agency challenges and needs is what makes Willdan unique.

Financial Strength
Willdan maintains a strong balance sheet with the financial and staffing resources to perform and complete all contractual obligations. We have continued to grow to better serve our clients by offering a continuously expanding range of municipal services. Willdan operates out of 51 offices located throughout the United States and over 1,500 employees.

Financial information, including information on revenue, earnings, and cash flow, are issued quarterly, and can be found at www.willdan.com. There are no pending conditions such as bankruptcy, pending litigation, planned office closure, impending merger, etc., that would impede Willdan’s ability to complete the City’s contract.

Corporate Mission and Philosophy
From Day 1, Willdan has maintained a business strategy focused on providing services to only public agencies. Today, 98 percent of our business is with public agencies. This strategy prevents potential conflicts of interest with private enterprises conducting business with our public agency clients or within their jurisdiction. Unique to Willdan is our understanding of public agency needs and issues. Willdan’s professionals often serve to extend our clients’ staff in the capacity of city and traffic engineers, planning directors, building officials, and other public agency positions. Additionally, many provide the added value of having served in public agency management positions prior to joining Willdan.

To meet and, on many occasions, exceed the expectations of our clients, Willdan fosters and instills a corporate culture of Customer-First among our staff and in our day-to-day work environment. Looking out for the County’s best interests is at the forefront of everything we do. Our customer-focused philosophy is particularly evident when dealing with complex situations and difficult challenges that are hard to resolve.

On-call engineering services are the center of Willdan's foundation – being the core of Willdan's founding in 1964. We have strengthened our services by incorporating former public agency staff who understand the importance and purpose of on-call contracts and are very familiar with the processes and procedures for such services. a condensed current list of public agencies that we have provided or are currently providing construction management and inspections services is provided below.

Proposal for Construction Management
And Inspection Services 2
City of Pico Rivera – Proposal for On-Call Construction Management and Inspection Services Municipal Agency Dates of Service Term of Contract
City of Bellflower 2015 – On Going 3 Years, Plus 2 Optional Years City of Brea 2015 – Ongoing 3 Years, Plus 2 Optional Years City of Burbank 2019 – Ongoing 3 Years, Plus 2 Optional Years City of Davis 2019 – Ongoing 3 Years, Plus 2 Optional Years City of Downey 2014 – Ongoing 3 Years, Plus 2 Optional Years (recently renewed) City of Fillmore 2018 – Ongoing 3 Years, Plus 2 Optional Years City of Grand Terrace 2018 – Ongoing 3 Years, Plus 2 Optional Years City of Hayward 2016 – Ongoing 3 Years, Plus 2 Optional Years City of Highland 2016 – Ongoing 3 Years, Plus 2 Optional Years (recently renewed) City of Laguna Niguel 2018 – Ongoing 3 Years, Plus 2 Optional Years City of Long Beach 2010 – Ongoing 3 Years, Plus 2 Optional Years City of Newport Beach 2019 – Ongoing 3 Years, Plus 2 Optional Years City of Palm Springs 2015 – Ongoing 3 Years, Plus 2 Optional Years City of Pomona 2014 – Ongoing 3 Years, Plus 2 Optional Years (recently renewed) City of Rancho Cordova 2019 – Ongoing 3 Years, Plus 2 Optional Years City of Redlands 2018 – Ongoing 3 Years, Plus 2 Optional Years City of Rialto 2018 – Ongoing 3 Years, Plus 2 Optional Years City of Ridgecrest 2010 – Ongoing 3 Years
City of San Bernardino 2016 – Ongoing Undefined term limit City of Simi Valley 2013 – 2020 Undefined term limit
City of South Pasadena 2018 – Ongoing 3 Years, Plus 2 Optional Years City of Tustin 2005 – Ongoing 3 Years, Plus 2 Optional Years City of Ventura 2016 Undefined term limit (Yearly Renewal) City of Santa Monica 2016 Undefined term limit (Yearly Renewal) Proposal for Construction Management
And Inspection Services 3
City of Pico Rivera – Proposal for On-Call Construction Management and Inspection Services Proposed Staffing
Willdan offers the City of Pico Rivera a highly qualified team of professionals with the technical qualifications and diverse capabilities necessary to undertake construction management and inspection services for the City. Willdan understands that key personnel assigned on projects shall not be reassigned without prior written approval from the City.

Team / Title / Experience /
Role
Credentials
Mr. Chris Baca, RCI
Director of Construction Management
and Inspection
40 Years’ Experience
Project Role: Project Manager
 BS, Public Administration, California State University, Fullerton  Public Works Inspection, California State University, Los Angeles Extension
 California, Division IV, Public Works, RCI No. 4161
 California, Division I, Engineering, RCI No. 5161
Mr. Michael Bustos, PE, ENV SP
Deputy Director of Construction
Management and Inspection
23 Years’ Experience
Project Role: Deputy Project Manager
 BS, Civil Engineering, California Polytechnic State University, San Luis Obispo
 Caltrans Resident Engineer Academy
 Civil Engineer, California No. 73173
 Envision Sustainability Professional, Institute for Sustainable Infrastructure No. 2696
Mr. Matthew Villegas
Public Works Inspector
11 Years’ Experience
Project Role: Construction Manager
 Bachelor of Arts & Sciences, Psychology, California State Polytechnic University, Pomona
Mr. Saul Martinez
Construction Manager
25 Years’ Experience
Project Role: Construction Manager
 Engineer-in-Training, CA No. 112670
 Qualified SWPPP Practitioner (QSP)
 Certified Erosion, Sediment, & Stormwater Inspector (CESSWI)  Nuclear Density Gauge certified Caltrans Resident Engineer Academy
Mr. Brent Jablonowski
Construction Inspector
20 Years’ Experience
Project Role: Construction Inspector
 Construction Technologies/Inspection, Ventura County
Community Colleges
 Certified Master of Special Inspections
 ACI Field Grade 1 Technician
 Uniform Building Code (UBC) Building Inspector
 Title 24 Masonry special inspector
 Division ofthe State Architect (DSA) Special Inspector Mr. John Dela Cruz
Construction Inspector
42 Years’ Experience
Project Role: Construction Inspector
 Certified Erosion, Sediment and Storm Water Inspector (CESSWI), #4694
 Qualified Storm Water Practitioner (QSP), #25924
 AHERA Building Inspector #02121
 EPA/AHERA
Mr. Mario Cisneros
Assistant Construction Manager
8 Years’ Experience
Project Role: Office Engineer
 BS, Civil Engineering, California State University, Northridge  Caltrans Resident Engineer Academy
 Traffic Control for Safer Work Zones Certification
Proposal for Construction Management
And Inspection Services 4
City of Pico Rivera – Proposal for On-Call Construction Management and Inspection Services Ms. Jane Freij
Labor Compliance Manager
30 Years’ Experience
Project Role: Labor Compliance
Manager
 BA, Linguistics, University of Kansas
 Attorney Assistant Training Program, Litigation/ Corporations, University of California, Los Angeles
Ms. Lani Alfonso, PE
Principal Project Manager
20 Years’ Experience
Project Role: Grant Funding
Administrator
 BS, Civil Engineering
 Civil Engineer, California, No. 56397
The organization chart below identifies the project roles for our team and illustrates the communication and reporting relationships among the team. Any changes in identified key personnel after the award of the agreement will be approved by the City in writing before the change is made. Willdan’s proposed team is available to begin work as soon as possible after the selected firm receives the notice to proceed.

Resumes for our proposed key staff are attached in the following pages. For any questions or clarifications, please contact our Project Manager, Chris Baca at [email protected] or phone (310) 502-6335.

Proposal for Construction Management
And Inspection Services 5
City of Pico Rivera – Proposal for On-Call Construction Management and Inspection Services Michael D. Bustos, PE, ENV SP
Deputy Director of Construction Management and Inspection Project Role: Deputy Project Manager
Profile Summary
Education: BS, Civil Engineering (Magna Cum Laude), California Polytechnic State University, San Luis Obispo
Caltrans Resident Engineer Academy
Registration: Civil Engineer, California No. 73173
Envision Sustainability Professional, Institute for Sustainable Infrastructure Experience: 23 Years
Mr. Michael Bustos is responsible for project and construction management of drainage, pipeline, pavement rehabilitation, street improvement, traffic signal, landscaping and irrigation, and grading projects. He has served as construction manager or resident engineer for over 100 public works projects, including over 20 federally funded projects. He serves as project manager for Willdan’s on-call construction management and inspection services provided to the cities of Ridgecrest, Inglewood, Downey, Westlake Village, Santa Monica, and Fillmore. He has gained valuable experience in on-site construction management, off-site construction administration, design, and plan checking.

Relevant Project Experience
FY 22-23 Measure V Pavement Rehabilitation and Chip Seal, City of Ridgecrest, California. Project Manager/Resident Engineer responsible for oversight of Willdan’s civil and traffic engineering design, environmental compliance, right-of-way acquisition, bidding assistance, resident engineering, construction management, inspection, materials testing, federal funding administration, and labor compliance services for two construction projects funded by the City’s local gas tax. The $6 million pavement rehabilitation project included PCC Improvements, widenings, and overlay of 19 street segments throughout the city and the $700,000 chip seal project included chip seal and striping of 17 street segments throughout the city.

Downs Street Widening Project, City of Ridgecrest, California. Resident Engineer responsible for oversight of Willdan’s civil and traffic engineering design, environmental compliance, right-of-way acquisition, bidding assistance, resident engineering, construction management, inspection, materials testing, federal funding administration, and labor compliance services for widening improvements from two lanes to four lanes on Downs Street between Ridgecrest Boulevard and Upjohn Avenue. The project involved utility pole relocations, raised median, curb ramps, curb, gutter, sidewalk, driveway approaches, street lighting conduit, culvert, cement treatment, ARHM overlay, signing, striping, and RRFB. These services were provided under Willdan’s on-call engineering contract.

ITS Gap Closure Project, Inglewood, CA. Project Manager/Construction Manager. Willdan is currently providing construction management, inspection, and material testing for the City’s ITS Gap Closure project. The City has already implemented Phase 1-4 of the Intelligent Traffic Systems Program with future phases 5-6 scheduled. This Project is a continuation of the ITS Program that will expand and improve existing ITS network by upgrading traffic signal hardware, software, and fiber optic communications. Traffic signal installations and/or modifications are being made at 17 intersections throughout the city. The construction contracts were separated into two contracts (material procurement and installation).

Proposal for Construction Management
And Inspection Services 6
City of Pico Rivera – Proposal for On-Call Construction Management and Inspection Services Intermodal Transit Facility Project, City of Inglewood, California. Construction Manager responsible for oversight of Willdan’s construction management, inspection, and material testing services for the Intermodal Transit Facility Project, which included remediation of hazardous and contaminated soils, grading, driveways, sidewalks, curbs, gutters, utility relocations, lighting, security systems, electrical systems, low-voltage systems, ADA improvements, bollards, pavement legends, striping, storm water systems, storm drain systems, catch basins and drop inlets, and all necessary items complete in place.

Willdan provided CM, public works inspection, labor compliance, and material testing services. These services were provided under Willdan’s on-call engineering contract. Willdan provided design services on this project as well.

Old River School Road Rehabilitation, City of Downey, California. Resident Engineer responsible for oversight of Willdan’s construction management, inspection, and materials testing services for the federally funded Old River School Road Pavement Rehabilitation Project. This project generally consisted of the installation of 32,000 LF of fiber-optic traffic signal communications conduit, pull boxes and termination panels; cold milling, leveling course and overlay; curb ramps, curb and gutter, and sidewalk; implementation of Class II and Class III bike facilities; and striping and signage. These services were provided under Willdan’s on-call construction management and inspection contract. 3rd Street Water System Improvements Project (Rives Ave to Old River School Road), CIP 20-23, City of Downey, California. Construction Manager. Willdan provided inspection and materials testing services for this water system improvements project on 3rd Street between Paramount Blvd and Civic Center Drive.

The project involved installation of new potable water ductile iron pipe, gate valves, tees, bends, thrust blocks and appurtenant fittings; installation of new fire hydrant assemblies, water service lines, meters, and boxes; abandonment of existing water mains, service lines, and associated facilities; trenching, backfill, and compacting; asphalt concrete (AC) and Portland cement concrete (PCC) pavement reconstruction; reconstruction of miscellaneous PCC improvements; and other appurtenant work.

Sumac Park Restroom Renovation, City of Agoura Hills, CA. Project Manager responsible for oversight of construction management and inspection services for the restroom renovation. The restroom building rehabilitation involved roof replacement, electrical and plumbing repairs, new water bottle filling station, fixture replacements, stucco exterior, stone veneer pilasters, security mesh screening, new gates and hardware, toilet accessories, slab reconstruction, and painting. Minor concrete improvements entailed removing and reconstructing concrete sidewalks, curb ramps, and curbs and installing parking lot striping.

Triunfo Canyon Road at Saddle Mountain PHB, City of Westlake Village, California. Project Manager responsible for oversight of construction management, inspection, labor compliance and material testing services for the installation of a new pedestrian hybrid beacon (PHB) system. The project included curb ramp reconstructions, new electrical service, pole foundations and pole installations, conduit, pull boxes, and signage. These services were provided under Willdan’s on-call city engineering contract.

Proposal for Construction Management
And Inspection Services 7
City of Pico Rivera – Proposal for On-Call Construction Management and Inspection Services Christopher Baca, RCI
Director of Construction Management and Inspection
Project Role: Project Manager
Profile Summary
Education: BS, Public Administration, California State University, Fullerton Public Works Inspection, California State University, Los Angeles Extension Asphalt Paving, Contract Administration and Change Orders for Federally Funded Projects Seminars
Inspection Principles, Public Contact, Slurry Seal, and Traffic Signal Inspection and Design Seminars
Registration: Registered Construction Inspector, Division IV, Public Works, California No. 4161 Registered Construction Inspector, Division I, Engineering, California No. 5161 Experience: 40 Years
Mr. Christopher Baca is responsible for directing and monitoring public works inspection services and overseeing construction inspection personnel. His experience includes construction management of capital improvement projects in areas of water systems, street improvements, park improvements, storm drains, sanitary sewers, asphalt resurfacing (including asphalt-rubber products), concrete paving, landscaped medians, and traffic signals. Mr. Baca is familiar with the inspection and contract administration of other federally funded projects in accordance with Caltrans Local Assistance Procedures Manual. Prior to joining Willdan, Mr. Baca worked for a soils engineering firm conducting field inspections and performing laboratory testing.

Relevant Project Experience
On-Call Public Works and Land Development Inspection Services, City of Long Beach, CA. Project Manager. Willdan is providing on-call public works inspection for various CIP and permitted projects throughout the City of Long Beach. Willdan has maintained a continuous presence in the City since 2004.

Willdan is responsible for inspecting and observing curbs, gutter, sidewalk, storm drain, traffic signal and sewer system installations, asphalt over-lays, grading, and other related work. Field files are maintained in accordance with Caltrans standards; Willdan provided labor compliance and coordinated all material testing.

On-Call Construction Management Services, City of Norco, CA. Project Manager. Willdan provides on-call public works inspection for various projects throughout the City of Norco.

On-Call Public Works and Construction Management Services, City of Redlands, CA. Project Manager.

Willdan provides public works inspection and construction management services for various projects located throughout the City.

On-Call Construction Management and Inspection Services, City of Rancho Cucamonga, CA. Project Manager. Willdan is providing construction management and inspection services for the City of Rancho Cucamonga. A few of the projects are Crest Road at Whitley, Robert Ryan Park Construction, Arterial Street Resurfacing, and Hawthorne Boulevard at PVDW Landscape On-Call Construction Management and Inspection Services, City of Newport Beach, CA. Project Manager. Willdan is providing construction management and inspection on various permitted and capital improvement projects throughout the City.

Proposal for Construction Management
And Inspection Services 8
City of Pico Rivera – Proposal for On-Call Construction Management and Inspection Services C. Matthew Villegas
Construction Management and Public Works Inspector
Project Role: Construction Manager
Profile Summary
Education: Bachelor of Arts & Sciences, Psychology, California State Polytechnic University, Pomona Experience: 11 Years
Mr. C. Matthew Villegas is an experienced public works inspector/electrical inspector with extensive background in installation and repair of lighting, including park, recreational center, airport and runway lighting; installation of traffic signals, ramp meters, count stations, CCTV systems, pump stations, and fiber optics for the public and private sectors. In addition, he has extensive knowledge of asphalt overlay, trench repairs, utility installation, concrete repairs, and other appurtenant work. He has excellent leadership skills and is adept at overseeing projects and supervising teams. He possesses excellent critical thinking, problem solving, leadership, time management, and communication skills. He is proficient in Excel, Word, Outlook, Oracle and Salesforce.

Relevant Project Experience
Regional Bikeway Project CIP No. 21280 Federal Project No. ATPL-5351(032), City of Pico Rivera, California. Construction Manager. Willdan Engineering is providing Construction Management and Public Works inspection services on this project, which consists of construction of a 1.1 mile long Class IV bike lane along Mines Avenue from Paramount Boulevard to the San Gabriel River. Additional improvements along Mines Avenue include construction of bio-swales and planting of drought tolerant landscaping, sidewalk and ADA improvements, pavement reconstruction, and signal modifications at the intersections of Paramount Boulevard at Mines Avenue and Rosemead Boulevard at Mines Avenue. Construction cost is approximately $6.5 million.

Beverly Boulevard and San Gabriel River Parkway Medians Project, City of Pico Rivera, California.

Construction Manager. Willdan Engineering is providing Construction Management services for this project, which consists of the construction of raised landscaped medians from the west city limits to San Gabriel River Parkway, including drought tolerant landscaping, and irrigation of recycled water.

City Hall ADA and Improvements Project, City of Pico Rivera, California. Construction Manager. Willdan provided construction management and inspection services for this project, which involved Americans with Disabilities Act improvements at City Hall exterior paths of travel, sidewalks, and along parking lots to bring them to compliance with current ADA standards. The project included asphalt, sidewalks, curbs, curb ramps, ADA railings, striping and signage.

Local Streets Rehabilitation Phase 2 Zone 19, City of Norwalk, California. Construction Manager.

Willdan is currently providing construction management and inspection for this project that involves cold milling existing AC pavement, AC removals and reconstructions, ARAM interlayer, ARHM overlays, AC overlays and adjusting utilities to grade; signing, striping, loop detector replacements, and traffic control; removal and replacement of cross gutters and spandrels, including adjacent curb and gutter, and ADA curb ramps; including incidental asphalt work; utility relocations and traffic control. 2023 Citywide Resurfacing Slurry Seal and Cape Seal Project, City of Pico Rivera, California.

Construction Manager. Willdan is currently providing construction management and inspection for this project that involves slurry seal on 17 street segments and cape seal on 18 additional street segments.

The project also involves repairs to curb and gutter, reconstruction of ADA curb ramps, and striping.

Proposal for Construction Management
And Inspection Services 9
City of Pico Rivera – Proposal for On-Call Construction Management and Inspection Services Improvements at Eight Crosswalk Locations, HSIPL-5331(021), City of La Puente, California.

Construction Manager. Willdan is providing construction management, inspection and labor compliance for this federally funded project. The project includes curb and gutter reconstruction, sidewalk and driveway approaches, ADA curb ramps, installation of a rectangular rapid flashing beacon, curb extension, cold milling and ARHM overlay, pavement markings and warning signs.

Los Angeles World Airport (LAWA) Intelligent Traffic System (ITS) Project, City of Inglewood, California.

Construction Manager. Willdan is currently providing construction management, inspection, and materials testing for this project, which consists of installation of conduit, fiber optics communication, changeable message signs, traffic signal poles and heads, traffic controllers, fisheye video detection system, closed circuit television camera system, installation of new pull boxes, installation of pedestrian push buttons and pedestrian signal countdown assemblies, new ADA access ramps, necessary hardware to integrate the equipment into the City’s ITS network, and appurtenant work. This project includes work along the La Cienega Corridor from Hills St at Century Blvd and the Century Blvd Corridor between La Cienega Blvd and Van Ness Ave. Value of the project is approximately $11 million.

Various Projects, Intense Lighting (Leviton), City of Anaheim, California. Public Works Inspector/Electrical Inspector/Project Manager. Mr. Villegas specialized in skilled electrical work in the installation, maintenance, and repair of custom illuminated handrails to both a nationwide and an international market. He spearheaded all office operations, including quote takeoffs, tracking drawing completion schedules, interpreting and overseeing all project drawings and diagrams, generating RFIs and change orders, monitoring compliance to specifications and contracts, managing facility inventory and shipping, developing solutions to ensure compliance with established guidelines, and overseeing projects to ensure completion on a timely basis.

Various Projects, Power Up Enterprises, City of Fontana, California. Public Works Inspector/Project Manager. Mr. Villegas specialized in private and public works electrical construction projects for the installation of traffic signals and lighting, count stations, CCTV Systems, fiberoptic systems, Caltrans maintenance stations, and park and recreational lighting, assuring that all specifications were followed and were compliant with contract provisions and safety requirements. He oversaw all management and administration of projects and materials, including bid takeoffs, tracking project completion schedules, and generating RFIs and change orders. He coordinated with contractors and clients to deliver quality projects on a timely basis.

Various Projects, CMV Electric, City of Upland, California. Public Works Inspector/Project Estimator.

Mr. Villegas specialized in private and public works electrical construction projects for the installation of traffic signals and lighting, ramp metering, count stations, CCTV systems, pump stations, fiberoptic systems, Caltrans maintenance stations, park and recreation center lighting, and airport and runway lighting, ensuring that all specifications were followed and were compliant with contract provisions and safety requirements. He oversaw all management and administration of projects and materials, including bid takeoffs, tracking project completion schedules, and generating RFIs and change orders.

He coordinated with contractors and clients to deliver quality projects on a timely basis.

Proposal for Construction Management
And Inspection Services 10
City of Pico Rivera – Proposal for On-Call Construction Management and Inspection Services Saul Martinez
Construction Manager
Project Role: Construction Manager
Profile Summary
Education: BS, Civil Engineering, California State Polytechnic University, Pomona AA, Mount San Antonio College, Walnut, California
Drafting Certificate, Santa Ana College, Santa Ana, California Registration: Certification as a Qualified SWPPP Practitioner (QSP) Certified Erosion Sediment and Storm Water Inspector
Engineer-In-Training (E.I.T.)
Experience: 22 Years
Mr. Saul Martinez possesses over 22 years of public works inspection and construction management experience. Mr. Martinez has experience working as a Project Management, Plan Review, and a Project Engineer. He has experience working on projects such as street rehabilitation, street improvements, irrigation system, street lighting, water reservoir, water improvement, storm drain, and sewer improvements.

Relevant Project Experience
Ernie Howlett Park Improvements, City of Rolling Hills Estates, California. Construction Manager.

Willdan provided design, project management, construction management, inspection, and material testing for this park improvements project at Ernie Howlett Park, adjacent to Hawthorne Blvd in the City of Rolling Hills Estates. The Project included removal and reconstruction of curb and gutter, curb drains, drain inlet assemblies, decomposed granite walking path, wooden fencing, park benches, and exercise equipment, funding acknowledgement signs, and interpretive signs. Mr. Martinez was responsible for assisting with contract administration duties and overseeing Willdan’s inspection and testing staff.

Butterfly Garden Park, City of Bellflower, California. Construction Manager. Willdan is providing construction management, construction inspection, materials testing, and labor compliance services for this project, which is funded by Proposition 84 Urban Greening Grant Program. The goal of the project is to develop a sustainable green space with permeable surfaces, bioswale, walking path, benches, native plant vegetation that attracts butterflies, interpretive signage, and complimentary butterfly-shaped paving. The improvements include removals, driveway approaches, new asphalt pavement, curbs and gutters, sidewalks, permeable AC, DG walkways, colored PCC pavement, ornamental steel fencing, vehicular swing gates and rolling gates, monument signage, drinking fountains and bottle filling stations, park benches, bike racks, shade structures, pedestrian bridges, irrigation, and landscaping. Mr. Martinez is responsible for construction management duties and overseeing Willdan’s inspection and testing staff.

Stormwater and Runoff Capture Project at Mayfair Park, City of Lakewood, California. Construction Manager. Willdan provided project management, contract administration, construction observation, concrete materials testing, and labor compliance services for this project, which was funded by Proposition 84 and had enhanced labor compliance requirements. Park amenities included bollards, tennis courts, and baseball backstops. Other improvements included building extensions, storm drain diversion structures, pretreatment devices, underground storage gallery, wet well and submersible pumps, water treatment system, drainage improvements, electrical service and lighting, instrumentation devices, landscaping, and irrigation. Mr. Martinez has assisted with construction management duties and overseeing Willdan’s inspection and testing staff.

Proposal for Construction Management
And Inspection Services 11
City of Pico Rivera – Proposal for On-Call Construction Management and Inspection Services Lincoln Park and Surrounding Intersections ADA Accessibility and Pedestrian Supportive Improvements Projects, City of Pomona, California. Construction Manager. Willdan provided project and construction management services for street rehabilitation and street improvements on various local and arterial streets. Capital Improvement Project (CIP) No. 428-81055, Lincoln Park ADA Curb Ramps and Improvements, consisted of upgrading the park to meet ADA requirements, such as ADA accessibility and pedestrian supportive improvements to the park and to various surrounding intersections, including installation of an All-Way Stop, improved crosswalks, advanced signage modifications, additional lighting within the park and surrounding intersections, installation of a pathway, removal and replacement of an existing plaza area for enhanced ADA accessibility, and replacement of park irrigation system. In addition, Mr. Martinez assisted in preparing staff reports; managing Capital Improvement Projects by monitoring budgets and schedules; coordinating project closeout activities, including as-builts, staff report, Notice of Completion, release of retention, and warranty walk; attended preconstruction meetings; provided general oversight of contract administration during project construction, including recommending solutions; reviewed and recommended the approval of monthly progress pay estimates; assisted with review of contract change orders; and coordinated job walk for preparation of punch list.

City of Pomona, California. Construction Manager. Provide Construction Management services that consist of street rehabilitation and street improvements to various local as well as arterial streets throughout the City. Provided project management services to Capital Improvement Project (CIP) Lincoln Park ADA Curb Ramps and Improvements Project No. 428-81055 a local park, which consisted of upgrading the park to meet ADA requirements as well as the installation of a new irrigation system along with upgrading the street lights and cross walks leading into the park.

Jurupa Community Services District. As Project Manager/Development Supervisor, Mr. Martinez managed CIP Projects for the agency such as water line improvements, sewer line improvements for Milliken Avenue grade separation (bridge over Union Pacific Railroad Tracks), oversaw all new development within both City of Eastvale and City of Jurupa Valley, which entailed plan checking all water and sewer plans submitted to the District. He supervised two Development Engineering Representatives on a daily basis; and met with developers, engineer of record, residents to go over development projects and ensure that all plans, fees and documents were submitted in a timely manner in order to meet developer’s construction schedules. In addition, prepared yearly budget for the department, maintained development spreadsheets in order to keep Engineering Manager, Engineering Director, General Manager and Board Members informed of all development projects within the district.

City of Upland California. Associate Engineer, Public Works, Environmental Division, NPDES Coordinator for the City, which required maintaining compliance with all Federal and State “Clean Water Act” requirements. Coordinated all NPDES Inspections, Commercial, Industrial, Municipal and Construction and ensured the reports were submitted into the MS4 Database. Provided training to City Staff. In addition, Mr. Martinez was responsible for plan check services for all plans, private and CIP projects. He completed over 800 plan checks. In addition, he performed design of plans such as Storm Drain, Street Improvement Hydrology/Hydraulic Studies, and Sewer Capacity Studies. Mr. Martinez acted as Project Engineer and completed several Capital Improvement Projects (CIP) such as Sewer Rehabilitation, Storm Drain Improvements and Berm Repair. Also, prepared and submitted grants, netting $500,000 in grant funding.

Mr. Martinez provided Development Review of all proposed projects submitted to the Planning Department, which consisted of attending meetings, reviewing submitted plans and preparing reports “Conditions of Approval” on all projects submitted to the Planning Commission. Prepared Council Reports as required.

Proposal for Construction Management
And Inspection Services 12
City of Pico Rivera – Proposal for On-Call Construction Management and Inspection Services Brent D. Jablonowski
Construction Inspector
Project Role: Construction Inspector
Profile Summary
Education: Construction Technologies/Inspection, Ventura County Community Colleges, California Registration: Certified Master of Special Inspections, ACI Field Grade 1 Technician, Uniform Building Code (UBC) Building Inspector, Title 24 Masonry Special Inspector, Division of the State Architect (DSA) Special Inspector
Experience: 20 Years
Mr. Brent Jablonowski has 20 years of experience as a special inspector, building inspector, and public works observer with extensive structural expertise. He has worked on bridges, storm drains improvements, commercial buildings, municipal airport, schools, hospitals, parking structures, water treatment plants, water towers, batch plants, and precast plants; civil projects with driveway approaches, curbs, and gutters; solar structures; concrete welding and bolting; roof structures; mechanical screens, as well as soils work with nuclear gauge and burn tests and moisture cores and sampling. . Core competencies include: Reinforced Concrete Special Inspector, Structural Masonry Special Inspector, Structural Steel & Bolting Special Inspector, Structural Welding Special Inspector, Drilled In Anchors Special Inspector, Pre-stressed Concrete Special Inspector and LA County Concrete and Welding Inspector.

Mr. Jablonowski is proud to have served in the US Army and is a Veteran of Foreign Wars.

Relevant Project Experience
Butterfly Garden Park, City of Bellflower, CA. Construction Inspector. Willdan is providing construction management, construction inspection, materials testing, and labor compliance services for this project, which is funded by Proposition 84 Urban Greening Grant Program. The goal of the project is to develop a sustainable green space with permeable surfaces, bioswale, walking path, benches, native plant vegetation that attracts butterflies, interpretive signage, and complimentary butterfly-shaped paving. The improvements include removals, driveway approaches, new asphalt pavement, curbs and gutters, sidewalks, permeable AC, DG walkways, colored PCC pavement, ornamental steel fencing, vehicular swing gates and rolling gates, monument signage, drinking fountains and bottle filling stations, park benches, bike racks, shade structures, pedestrian bridges, irrigation, and landscaping. Mr. Jablonowski has been responsible for daily observation of the construction activities, materials testing coordination, preparing daily reports, tracking quantities, and coordinating with the Contractor’s foreman.

Guardrail Upgrades, County of Ventura, California. Public Works Observer responsible for observation of the construction activities, including daily monitoring of the contractor’s work, documenting changed conditions, tracking quantities, verifying proper traffic control devices, and coordinating material testing.

Construction elements on this federally funded project include Midwest Guardrail System installations with transition railings, terminal and end treatments, reinforced concrete blocks, crash cushion and anchor assemblies, and butterfly reflectors at 11 locations in the County of Ventura. These services were provided under Willdan’s on-call engineering contract.

Inglewood – ITS Gap Closure Project, California. Public Works Observer responsible for observation of the construction activities, including daily monitoring of the contractor’s work, documenting changed conditions, tracking quantities, verifying proper traffic control devices, and coordinating material testing.

This Project is a continuation of the ITS Program that will expand and improve existing ITS network by upgrading traffic signal hardware, software, and fiber optic communications. Traffic signal installations and/or modifications are being made at 17 intersections throughout the city. The construction contracts Proposal for Construction Management
And Inspection Services 13
City of Pico Rivera – Proposal for On-Call Construction Management and Inspection Services were separated into two contracts (material procurement and installation). Mr. Jablonowski serves as Construction Inspector responsible for daily monitoring of the construction activities, documenting changed conditions, tracking quantities, and coordination material testing. These services are being provided under Willdan’s on-call engineering contract.

Sumac Park Restroom, City of Agoura Hills, California. Public Works Observer responsible for observation of the construction activities, including daily monitoring of the contractor’s work, documenting changed conditions, tracking quantities, verifying proper traffic control devices, and coordinating building department inspections and material testing. The restroom building rehabilitation involved roof replacement, electrical and plumbing repairs, new water bottle filling station, fixture replacements, stucco exterior, stone veneer pilasters, security mesh screening, new gates and hardware, toilet accessories, slab reconstruction, and painting. These services were provided under Willdan’s on-call engineering contract. 2022 Major Street Rehabilitation, City of Lakewood, California. Public Works Observer responsible for observation of the construction activities, including daily monitoring of the contractor’s work, documenting changed conditions, tracking quantities, verifying proper traffic control devices, and coordinating material testing. Willdan is providing construction management, public works observation, labor compliance, and material testing services for the City’s 2022 Major Street Paving Project. The project involves pavement rehabilitation, (cold milling, leveling course, asphalt rubber hot mix overlay, thermosplastic striping, traffic loops, curb ramps, sidewalk, curb and gutter) on eight major and collector streets, for an estimated total distance of eight (8) linear miles. These services were provided under Willdan’s oncall engineering contract.

Office Building Tenant Improvement and Interior Renovation, City of Cerritos, CA. Lead Inspector for all source material, ICC, and civil inspections required for a City-owned approximately 33,000-square-foot, two-story building. The improvements entailed reconstructing the building exterior and portions of the interiors; upgrades to plumbing, mechanical, electrical, sheet rock, flooring, ceiling, paint and finishes, and glazing; reconstructing the roof; and installing new fire alarm and sprinkler systems.

Sumac Park Restroom Renovation, City of Agoura Hills, CA. Construction Inspector responsible for inspection services for the restroom renovation. The restroom building rehabilitation involved roof replacement, electrical and plumbing repairs, new water bottle filling station, fixture replacements, stucco exterior, stone veneer pilasters, security mesh screening, new gates and hardware, toilet accessories, slab reconstruction, and painting. Minor concrete improvements entailed removing and reconstructing concrete sidewalks, curb ramps, and curbs and installing parking lot striping.

Heritage Valley Parks Tract No. 5520 Offsite and Onsite Improvements, City of Fillmore, CA. Lead Special Inspector for all special inspections required for the $40 million developer-built and City-maintained offsite storm drain improvements; all onsite utilities; and other public improvements associated with construction of residential Tract No. 5520. The offsite improvements involved single- and doublereinforced concrete boxes, open channel, and RCP. The onsite improvements encompass all wet and dry utilities, street and drainage improvements, landscaping and irrigation, and roadway structural sections to support the 497-unit development.

Proposal for Construction Management
And Inspection Services 14
City of Pico Rivera – Proposal for On-Call Construction Management and Inspection Services John Dela Cruz
Construction Inspector
Project Role: Construction Inspector
Profile Summary
Education: College Coursework/Saddleback College, Mission Viejo, CA College Coursework/Rancho Santiago College, Santa Ana, CA College Coursework/Harbor College, Harbor City, CA
Registration: Certified Erosion, Sediment and Storm Water Inspector (CESSWI), #4694 Qualified Storm Water Practitioner (QSP), #25924
AHERA Building Inspector #02121; EPA/AHERA Asbestos Abatement Contract Supervisor #AACS-817-95
Experience: 42 Years
Mr. Dela Cruz has over 40 years of private and public works project construction management and inspection experience. Mr. Dela Cruz has a thorough knowledge of the Public Works Standard Plans and Specifications, Caltrans Standard Plans and Specifications, Work Area Traffic Control Handbook, Greenbook, Construction General Permit and OSHA safety orders. His project expertise includes residential, commercial, retaining walls, grading, wet and dry utilities, parking lots, roadways, highways, bridges, retaining walls, water treatment and storage facilities, construction and post construction water quality structures and environmental projects.

Relevant Project Experience
Garden Grove Boulevard Rehabilitation, Federal Aid Project No. CRAL-5328(088), City of Garden Grove, California. Public Works Inspector. Willdan provided inspection and materials testing for this federally funded street rehabilitation project on Garden Grove Blvd between Harbor Blvd and Fairview St. This project consisted of clearing and grubbing, roadway excavation, removing and reconstructing failed pavement areas, asphalt paving, asphalt rubber aggregate membrane (ARAM), RHMA-G surface course, replacement of PCC curb and gutter, bus pads, driveway approaches, sidewalks, depressions and wheel chair ramps, adjustments to utility covers to finish grade, installation of traffic striping, signing, pavement marking and markers, traffic detector loops, and re-establishment of centerline ties and monuments. Mr.

Dela Cruz served as the primary inspector responsible for providing inspection services to monitor completion of all specified work in compliance with the contract documents. He tracked all quantities, coordinated with the Contractor’s Foreman, prepared daily inspection reports, and reported directly to the City’s Construction Manager.

Chapman Avenue Resurfacing, CIP No. 1341000, City of Garden Grove, California. Public Works Inspector. Willdan provided inspection and materials testing for this street resurfacing and landscaping project on Chapman Avenue between Springdale St to Western Ave. This project consisted of clearing and grubbing, roadway excavation, removing and reconstructing failed pavement areas, asphalt paving, asphalt rubber aggregate membrane (ARAM), RHMA-G surface course, replacement of PCC curb and gutter, bus pads, driveway approaches, sidewalks, ADA curb ramps, utility adjustments installation of traffic striping, traffic detector loops, irrigation and landscaping, and re-establishment of centerline ties and monuments. Mr. Dela Cruz served as the primary inspector responsible for providing inspection services to monitor completion of all specified work in compliance with the contract documents. He tracked all quantities, coordinated with the Contractor’s Foreman, prepared daily inspection reports, and reported directly to the City’s Construction Manager.

Proposal for Construction Management
And Inspection Services 15
City of Pico Rivera – Proposal for On-Call Construction Management and Inspection Services Briggeman Drive Street Improvement Project, CIP 22/23-03, City of Los Alamitos, California. Senior Public Works and Water Quality Inspector. Mr. Dela Cruz provided inspection of hardscape and softscape demolition, street and sidewalk improvements, ADA curb ramps, longitudinal gutters, and striping and signage on Briggeman Drive between Los Alamitos Blvd and Reagan St.

On-Call Municipal Engineering Services for the Planned Development Communities of Portola Center, Serrano Summit, Teresina, and The Meadows, City of Lake Forest, California. Senior Public Works, Grading, and Water Quality Inspector. Mr. Dela Cruz provided inspection services for the Portola Center, a 98-acre gated residential community with a 5-acre park; the Serrano Summit, a 68-acre residential community with 2 community parks, a community center and a pool; the Teresina, a 28-acre planned residential community; and The Meadows, a 120-acre residential community with 5 neighborhood parks, a community center, 2 swimming pools, a soccer field, a mitigation wetlands area, and a Senior Affordable Housing site. Mr. Dela Cruz has also provided inspection and observation services for other projects in Lake Forest, including the Lake Forest City Hall, the Town Place Suites Hotel, Hampton Inn, Springhill Suites Hotel, Coffee Bean restaurant, Community Pool renovation, a Shell Gas Station, and several Traffic Signal projects. The duties involved inspection and observation of rough and precise grading of cut-and-fill materials, wet and dry utilities and structures, post construction structural water quality systems, installation of street and sidewalk improvements, handicap ramps, retaining walls, traffic signals, irrigation and landscaping, and relocation of existing utilities.

Street Improvements Project on Lakewood Boulevard, City of Downey, California. Senior Public Works Inspector. Mr. Dela Cruz provided inspection services for the Street Improvements Project for Lakewood Boulevard, including inspection of hardscape and softscape demolition, installation of wet and dry utilities and structures, street and sidewalk improvements, handicap ramps, retaining walls, traffic signals, street lighting, striping and signage, irrigation, landscaping, and relocation of existing utilities.

Street Improvements Project, City of Long Beach, California. Senior Public Works Inspector. Mr. Dela Cruz provided inspection services for this $15 million improvement project, which involved replacement of curb and gutter, handicap ramps, cross gutters, and asphalt overlays. Duties included inspection and observation of asphalt removal and replacement, asphalt grind and overlays, asphalt crack seal and slurry seal, replacement of damaged curb and gutter, sidewalks, striping and signage, traffic management and control. Additional duties included project documentation, public outreach, and coordination of consultants and utility agencies.

City Right-of-Way and Capital Improvement Projects, City of Huntington Beach, California. Senior Public Works Construction Manager and Inspector for Utility Company contracts performing work in the City Right of Way and Capital Improvement Projects. Duties included inspection and observation for asphalt removal and replacement; asphalt grind and overlays; asphalt crack seal and slurry seal; replacement of damaged curb and gutter, sidewalks, handicap ramps; and striping and signage.

Additional duties included project documentation, public outreach, and coordination of consultants and utility agencies.

Harbor Boulevard Street Rehabilitation Project, City of Santa Ana, California. Senior Construction Manager/Inspector. Mr. Dela Cruz provided construction management and inspection services on this project.

Street Improvement Projects, The Mission Viejo Company, City of Aliso Viejo, California. Senior Construction Manager/Inspector. Mr. Dela Cruz provided construction management and inspection services on this project.

Proposal for Construction Management
And Inspection Services 16
City of Pico Rivera – Proposal for On-Call Construction Management and Inspection Services Mario Cisneros
Assistant Construction Manager
Project Role: Office Engineer
Profile Summary
Education: BS, Civil Engineering, California State University, Northridge Registration: Caltrans Resident Engineer Academy, Traffic Control for Safer Work Zones Certification Experience: 8 Years
Mr. Mario Cisneros serves as Office Engineer and Construction Manager on public works capital improvements projects. His experience includes management of pavement rehabilitation, street improvements utility installations, traffic signal improvements, fiber optics, water wells, and building renovation projects. Mr. Cisneros uses his knowledge and skills in reviewing and implementing projects and plans, using cost-effective tools and techniques, dealing with contractors, staff, and efficiency to solve complex problems in order to bring maximum efficiency to the projects he’s involved on. He has the ability in working closely with team members, effectively accomplishing assigned responsibilities.

Relevant Project Experience
FY 22-23 Measure V Pavement Rehabilitation and Chip Seal, City of Ridgecrest, California. Project Manager/Resident Engineer responsible for oversight of Willdan’s civil and traffic engineering design, environmental compliance, right-of-way acquisition, bidding assistance, resident engineering, construction management, inspection, materials testing, federal funding administration, and labor compliance services for two construction projects funded by the City’s local gas tax. The $6 million pavement rehabilitation project included PCC Improvements, widenings, and overlay of 19 street segments throughout the city and the $700,000 chip seal project included chip seal and striping of 17 street segments throughout the city.

Downs Street Widening Project, City of Ridgecrest, California. Office Engineer responsible for assisting with bidding assistance, construction management, and federal funding administration services for widening improvements from two lanes to four lanes on Downs Street between Ridgecrest Boulevard and Upjohn Avenue. The project involved utility pole relocations, raised median, curb ramps, curb, gutter, sidewalk, driveway approaches, street lighting conduit, culvert, cement treatment, ARHM overlay, signing, striping, and RRFB. These services were provided under Willdan’s on-call engineering contract.

ITS Gap Closure Project, Inglewood, CA. Office Engineer. Willdan is currently providing construction management, inspection, and material testing for the City’s ITS Gap Closure project. The City has already implemented Phase 1-4 of the Intelligent Traffic Systems Program with future phases 5-6 scheduled. This Project is a continuation of the ITS Program that will expand and improve existing ITS network by upgrading traffic signal hardware, software, and fiber optic communications. Traffic signal installations and/or modifications are being made at 17 intersections throughout the city. The construction contracts were separated into two contracts (material procurement and installation).

Fair Oaks Traffic Signal Improvements, City of South Pasadena, California. Construction Manager responsible for construction contract administration for traffic signal and fiber optic improvements along the Fair Oaks Avenue corridor. This federally funded project included the installation of various traffic signal system items, including new emergency vehicle preemption (EVP) systems, ethernet switches, fiber hub switches, ethernet modules, advanced dilemma video detection, thermal detection, 2070 controllers, CCTV traffic monitoring systems, SMFO cable, conduit, system integration, splice vaults, and fiber patch panels. These services were provided under Willdan’s on-call engineering contract.

Proposal for Construction Management
And Inspection Services 17
City of Pico Rivera – Proposal for On-Call Construction Management and Inspection Services Sumac Park Restroom, City of Agoura Hills, California. Construction Manager responsible for construction contract administration for the park’s restroom building renovation project. The restroom building rehabilitation involves roof replacement, electrical and plumbing repairs, new water bottle filling station, fixture replacements, stucco exterior, stone veneer pilasters, security mesh screening, new gates and hardware, toilet accessories, slab reconstruction, and painting. Minor concrete improvements entailed removing and reconstructing concrete sidewalks, curb ramps, and curbs and installing parking lot striping. These services were provided under Willdan’s on-call engineering contract.

Inglewood – ITS Gap Closure Project, California. Office Engineer responsible for assisting with construction contract administration, including working day statements, RFI and submittal processing, change order and progress payment preparation, and meeting agendas and minutes. Willdan is currently providing construction management, inspection, and material testing for the City’s ITS Gap Closure project.

This Project is a continuation of the ITS Program that will expand and improve existing ITS network by upgrading traffic signal hardware, software, and fiber optic communications. Traffic signal installations and/or modifications are being made at 17 intersections throughout the city. The construction contracts were separated into two contracts (material procurement and installation). Mr. Jablonowski serves as Construction Inspector responsible for daily monitoring of the construction activities, documenting changed conditions, tracking quantities, and coordination material testing. These services are being provided under Willdan’s on-call engineering contract.

Triunfo Canyon Road at Saddle Mountain PHB, City of Westlake Village, California. Office Engineer responsible for assisting with construction contract administration, including working day statements, RFI and submittal processing, change order and progress payment preparation, and meeting agendas and minutes for the installation of a new pedestrian hybrid beacon (PHB) system. The project included curb ramp reconstructions, new electrical service, pole foundations and pole installations, conduit, pull boxes, and signage. These services were provided under Willdan’s on-call city engineering contract.

Joint City Pavement Rehabilitation FY 2017-18, Cities of Westlake Village and Agoura Hills, California .

Office Engineer responsible for assisting with construction contract administration, including RFI and submittal processing, change order and progress payment preparation, and meeting agendas and minutes. Willdan prepared plans and specifications and provided construction management, inspection, and materials testing for the portion of work within the City of Westlake Village. This project included digouts, tree root repairs, crack treatment, cold milling, AC overlay, ARHM overlay, profile milling, slurry seal, parking lot seal coats, utility adjustments, traffic detector loops, and pavement delineation. Work within Westlake Village included improvements within First Neighborhood, Three Springs Neighborhood, Triunfo Canyon Road, and La Tienda. These services were provided under Willdan’s on-call city engineering contract.

Old River School Road Rehabilitation, City of Downey, California. Office Engineer responsible for assisting with construction contract administration, including working day statements, RFI and submittal processing, change order and progress payment preparation, and meeting agendas and minutes for the federally funded Old River School Road Pavement Rehabilitation Project. This project generally consisted of the installation of 32,000 LF of fiber-optic traffic signal communications conduit, pull boxes and termination panels; cold milling existing asphalt pavement, placement of asphalt concrete leveling course and rubberized asphalt concrete overlay; replacement of curb ramps and uplifted or damaged curb and gutter and sidewalk in compliance with the ADA requirements; implementation of Class II and Class III bike facilities; and striping and signage. These services were provided under Willdan’s on-call construction management and inspection contract.

Proposal for Construction Management
And Inspection Services 18
City of Pico Rivera – Proposal for On-Call Construction Management and Inspection Services Jane Freij
Labor Compliance Manager
Project Role: Labor Compliance Manager
Profile Summary
Education: BA, Linguistics, University of Kansas
Attorney Assistant Training Program, Litigation/Corporations, University of California, Los Angeles
Experience: 30 Years
Ms. Jane E. Freij is an experienced Administrative/Project Manager with a proven record of profitability achieved through comprehensive and effective management of time and budget. Key areas of expertise include project needs analyses, scheduling and budgeting, contract administration/negotiation, legal documentation, policy and procedure development, and writing and editing. Asa Supervising Labor Compliance Manager, Ms. Freij provides oversight of labor compliance monitoring services for various federally-funded projects under FHWA, FTA, HUD, and EPA. She is familiar with the FHWA federal funding administration process from field review and request for authorization to final invoicing and has specialized training in the reporting requirements and fraud detection and prevention procedures for projects funded by the American Recovery and Reinvestment Act of 2009 (ARRA). Experience prior to joining Willdan includes 4 years with Edison Enterprises, where Ms. Freij served as Contract Administrator and Senior Contract Administrator. In these positions, she developed and negotiated contracts for products and services, monitored and enforced contractual compliance, constructed contractual terms and conditions, served as risk management liaison, and managed a multi-state licensing project for an energy services subsidiary. Ms. Freij has a strong legal background, having served as a paralegal and senior paralegal for litigation attorneys in the areas of real estate, land development, and contract law. She is experienced in Microsoft Word, Microsoft Excel, and Lexis-Nexis research software.

Relevant Project Experience
Federal Highway Administration (FHWA) Labor Compliance, Various Cities, California. Responsible for providing supervisory federal and state labor compliance services for FHWA funded projects in the following cities: Baldwin Park, Calabasas, Coachella, Commerce, Fillmore, Hawaiian Gardens, Huntington Park, La Cañada Flintridge, La Mirada, La Puente, Lakewood, Maywood, Monterey Park, Paramount, Pico Rivera, Placentia, Pomona, Rancho Palos Verdes, Ridgecrest, Rolling Hills Estates, Rosemead, South Gate, South Pasadena, Thousand Oaks, and Westlake Village.

Community Development Block Grant (CDBG) Labor Compliance, Various Cities, California. Responsible for providing supervisory federal and state labor compliance services for CDBG funded projects administered by the U.S. Department of Housing and Urban Development (HUD) and the Los Angeles County Community Development Commission (LACDC) in the following cities: Bell Gardens, Burbank, Calimesa, Commerce, Hawaiian Gardens, La Mirada, Lawndale, Maywood, Paramount, Pico Rivera, Rosemead, San Marino, South El Monte, South Gate.

Various Transit-Related Facility Improvements, Foothill Transit. Labor Compliance Manager. Responsible for providing comprehensive labor compliance services on six transit-related facility improvement projects with a total construction cost of approximately $8 million. The projects are funded through the Federal Transit Authority (FTA) utilizing American Recovery and Reinvestment Act (ARRA) funds. In addition, Ms. Freij is assisting the agency with federal reporting requirements pertaining to the use of ARRA funds and contractor utilization of Disadvantaged Business Enterprises (DBEs) Proposal for Construction Management
And Inspection Services 19
City of Pico Rivera – Proposal for On-Call Construction Management and Inspection Services Palos Verdes Drive North Bike Lane, City of Rolling Hills Estates, California. Labor Compliance Officer/Federal Grant Administrator. Responsible for providing labor compliance and grant administration services for this project, for which Willdan Engineering secured federal STPL funds in the amount of $2,081,000 (Call for Projects Grant) and state funds in the amount of $554,580 (SR2S Grant). 226th Street Extension, City of Hawaiian Gardens, California Supervising Labor Compliance Manager.

Responsible for providing labor compliance services for this Community Development Block Grant (CDBG) project, administered through the Los Angeles County Community Development Commission (LACDC) at a project cost of approximately $210,000.

Palos Verdes Drive North, City of Rolling Hills Estates, California Federal Labor Compliance Officer/Grant Administrator. Responsible for providing federal labor compliance and grant administration services for this project, funded through the Federal Highway Administration (FHWA) American Recovery and Reinvestment Act (ARRA) at a total project cost of approximately $400,000.

Proposal for Construction Management
And Inspection Services 20
City of Pico Rivera – Proposal for On-Call Construction Management and Inspection Services Consultants and/or Sub-consultants
Willdan's strength of staffing resources and available in-house disciplines enables us to provide all services and disciplines required for Pico Rivera’s on-call construction management and inspections services contract without the use of subconsultants.

Work Approach
Willdan understands that the City of Pico Rivera may seek assistance on numerous types of projects under this on call construction management contract, such as street rehabilitation, sewer improvements, storm drain improvements, bridge construction, new building construction, water service and pipelines, pump and motor improvements, irrigation and landscaping, site improvements, system controls and instrumentation, streets and park lighting, parks and recreation facility improvements, mechanical systems, electrical systems, and traffic signal improvements.

Construction management services will include
constructability reviews, bid analysis, staff reports,
general contract administration submittal and RFI
review and processing, constructability reviews, change order review, safety monitoring, progress payment
review and processing, inspection, claims review and
analysis, labor compliance, community workforce
agreement compliance, project closeout, community
outreach, and federal funding administration.

Inspection efforts shall effectively and efficiently ensure that all work complies with the approved construction
documents and applicable codes and regulations (i.e.

Caltrans, APWA, AWWA, City of Pico Rivera, and Los
Angeles County.) Through Willdan's long history of
providing these identical services to cities and counties throughout California, we have ascertained that success working under this type of on-call contract is dependent upon understanding a variety of elements such as:
 Short project durations and minimal lead times for assignments may be required  Flexibility in service assignments, understanding work to date, and coordinating completion of project tasks already started by agency staff is crucial  Staff availability to work assignments as they develop is critical to moving projects forward  Efficient use of resources is important for project assignments that are relatively small  Consistent, organized project management is vital due to the potentially large numbers of projects that may be in process
 Regular attention to quality assurance and control is particularly important as short-term projects may limit the number of interim review steps often associated with a project-specific contract At any given time, Willdan has over 200 on-call contracts where project assignments are issued by the public agency on an as-needed basis. The project scopes, schedules, and costs are negotiated and agreed upon prior to project award. Every month, Willdan reports the progress performance of each project. The scope of services requested vary from project to project and can include any combination of constructability reviews, bidding assistance, construction management, construction inspection, labor compliance, materials testing, utility and outside agency coordination, and project closeout.

On-Call Experience Key Advantages
 Willdan's history of working with on-call
contracts has well prepared our staff to
respond to all requests for services in a
positive, efficient manner
 Delivers the combination of experienced,
hands-on skills and perspective that ensures
the City receives high-quality service at
reasonable and competitive cost
 Assures that, in selecting Willdan, clients
benefit from the expertise, experience, and
professionalism needed to be successful in
delivering high-quality projects and services
on time and within budget
Proposal for Construction Management
And Inspection Services 21
City of Pico Rivera – Proposal for On-Call Construction Management and Inspection Services Project Management Goals
Willdan has two primary goals since our inception in 1964:
 Ensuring the success of our clients
 Enhancing their communities
Working steadily towards these goals we gained a notable reputation for project understanding, technical excellence, cost effectiveness, and client responsiveness. It is these attributes that our construction management and inspection team bring to each project. To these primary objectives, we add individual project-oriented goals that include:
 Ensuring Project success – Provide City and contractor with constant input and feedback affecting projects
 Community Enhancement – Monitor project for conformance to City’s high standards  Impeccable Recordkeeping – Maintain construction files pursuant to City, Willdan, and Caltrans Local Assistance Procedures Manual
 Rigorous Budget Control – Provide biweekly construction budget updates to City Project Manager
 Maintain Schedule – Provide weekly schedule updates and ensure contractor complies with project schedule requirements
 Resident and Business satisfaction - Provide initial project flyers and periodic updates to businesses and residents affected by the project; set up project hotline for high profile CIP projects that impact a significant number of citizens; ensure project is well maintained and project traffic controls are installed per project plans, CAMUTCD, and City requirements Project Approach
Willdan’s approach to construction management starts with assigning the appropriate staff to fit the assignment’s needs. For construction projects, the primary team members will include a construction manager and the project inspector. Our management team will work closely with the City’s Project Manager to assign the most qualified individuals to each project. To achieve these goals, Willdan’s approach to management and inspection of the City’s construction projects includes:
 Thorough review of project specifications and plans
 Initial set-up of project-specific construction management files  Identify and address key project issues prior to start of construction  Agree on project-specific quality assurance program
 Identify and coordinate with outside utility agencies and/or permitting agencies impacted by the projects
 Arrange preconstruction meeting and process RFIs and submittals in a timely manner  Maintain detailed project records and provide weekly/monthly reports  Arrange weekly project meetings to review and address project issues  Provide qualified inspectors to closely monitor contractor's work and progress  Provide detailed inspection reports of developer/contractor’s daily activities  Promptly respond to resident and business complaints and questions  Provide final project close-out documents conforming to City, Willdan, and other concerned parties Proposal for Construction Management
And Inspection Services 22
City of Pico Rivera – Proposal for On-Call Construction Management and Inspection Services There are many routine aspects that are common to the way every construction project is performed in terms of construction administration and inspection of development, permitted, and capital improvement projects as outlined in our scope and in the diagram below:

Willdan adopted the Caltrans' Construction Manual as our in-house quality standard and have incorporated Caltrans' prescribed standards and procedures into our everyday inspection routine. This ensures we meet federal and state guidelines from the start. To supplement the Caltrans Construction Manual, we have also developed checklists as a means of quality control for our typical project field files, federally funded project documentation, BMP inspections, slurry seal inspections, ARHM paving inspections, water main inspections, and traffic signal inspections.

Contractor Compliance: Our staff has extensive experience with a myriad of public works projects and has a clear understanding of the issues surrounding inspection of the work. For example, when constructing sidewalks and ADA-compliant ramps, our team will ensure adequate subgrade compaction has been achieved. They will monitor the work for conformance with the plans, specifications, and ADA requirements. The concrete tickets will be checked to ensure materials match the approved mix design. A smart level will be used to check forms and the contractor will not be approved to place concrete until the work meets all City and other applicable standards. Willdan’s team will monitor the contractor’s operations for conformance with City compaction standards by working with the City’s approved material testing lab and will not accept any trench backfill or allow any pavement repair until proper compaction is verified by the lab.

Project Budgets: Construction costs are proactively managed and tracked against available budgets by our Construction Managers. This starts with an initial quantity takeoff from the construction plans, utilizing Bluebeam Revu, serving as an independent audit of the project quantities as they correlate to the bid schedule quantities. Early identification of potential quantity busts and continual monitoring of quantities throughout construction is key to maintaining project costs within established budgets. Our team creates and maintains change order logs and final cost projection spreadsheets on a weekly basis to document and track all quantity adjustments, approved change orders, pending change orders, and potential change orders. The City’s Project Manager is kept abreast of the project budget status throughout construction so that adjustments can be made to the scope of the project, or proper procedures can be followed to request additional funding, if needed to stay within the established contingencies. Willdan’s team also focuses on quickly processing RFIs and change order requests and providing direction to the Contractor as needed to keep them moving and avoid costly delays.

Proposal for Construction Management
And Inspection Services 23
City of Pico Rivera – Proposal for On-Call Construction Management and Inspection Services Scheduling: The contractor’s critical path method baseline schedule will be reviewed and accepted prior to issuance of a notice to proceed. The schedule will identify major items of work and will be the vehicle for monitoring, controlling, and tracking progress. The schedule will be required to be updated monthly to reflect actual and forecasted completions. This allows our construction managers to anticipate and forecast potential issues and develop an advanced strategy to proactively mitigate problems before they impact the schedule. In instances where schedule delays are expected to occur, due to weather, approval requirements or information from an outside agency, material shortages, or other unanticipated factors, the City’s Project Manager will be immediately notified of the potential project delay. Strategies will be developed and implemented to resolve project challenges and expedite the approval of the affected projects. As the Project Manager, Mr.Baca will monitor all progress on a weekly basis.

Cloud-Based Construction Management: Willdan is experienced in utilizing cloud-based applications, such as Procore and Virtual Project Manager (VPM), to manage the paperwork and record keeping on CIP projects. Upon startup of a new construction project, Contractor RFIs and submittals are provided through the cloud-based application, assigned to an appropriate team member, comments or responses are uploaded to the project site, and all parties are notified via email when the document is uploaded. The cloud-based application automatically creates and maintains logs to track the status of each submittal and RFI. Willdan’s electronic project records are also maintained on the applications so that our clients have access to the project records in real time.

Customer Service: To meet and often exceed the expectations of our clients, Willdan fosters and instills a corporate culture of Customer-First among our staff and in our day-to-day work environment.

Looking out for our customer’s best interests is at the forefront of everything we do. Our customerfocused philosophy is particularly evident when dealing with complex situations and difficult to resolve challenges. Willdan's corporate goal is to exceed the City of Pico Rivera’s expectations.

Specific Areas of Expertise
In-House Services: Willdan provides comprehensive in-house construction engineering services to our clients. We have successfully provided these services to California agencies for over 60 years.

On-Call Contracts Expertise: Willdan understands the unique aspects of working under an on-call contract. Resource needs to successfully accomplish assignments arising from on-call contracts vary greatly and our approach to on-call project delivery – developed over many years – enables us to successfully meet our clients' multi-faceted needs. Our approach to success working under on call contracts includes:
• Conducting business with truthfulness and high ethical standards • Approaching each project with a spirit of resourcefulness and excellence
• Maintaining high ethical standards of technical quality • Seeking appropriate solutions that fit each project
Construction Management Expertise: Willdan provides expertise in all areas of project management, resident engineering, construction management, constructability reviews, construction contract administration, public works observation, labor compliance, materials testing, grant funding administration and compliance, utility coordination, and community relations. Willdan's corporate Proposal for Construction Management
And Inspection Services 24
City of Pico Rivera – Proposal for On-Call Construction Management and Inspection Services philosophy emphasizes strong leadership, cost effectiveness, timely performance, and consistent reciprocal communication with clients and internal and external resources.

Our resident engineers and construction managers offer reliable service, quality workmanship, use of good judgment, fair and equitable treatment, and adherence to our corporate integrity and high ethical standards with a spirit of resourcefulness, excellence, and a can-do attitude. These experienced team members identify and resolve discrepancies, ambiguities, omissions, or conflicts in plans, specifications, and bid schedules that might generate misinterpretation and/or lead to agency and contractor disagreements. Our professionals are adept at anticipating issues before they arise through continual review of project plans, specifications, and contract documents. Potential problems are brought to the attention of the City's Project Manager and/or the contractor, along with constructive recommendations for solutions, so that costly delays and negative impacts to the public and the project are avoided. Our team strives to resolve issues at the lowest level possible, while keeping those at higher levels in the loop on the issues and methods of resolution.

Construction Inspection Expertise: Willdan has an extensive history of providing on-call construction inspection services to public agencies throughout California. We have broad expertise and experience with large and small public works improvement projects involving a myriad of construction improvements, such as street reconstruction and rehabilitation, roadway widening, pavement resurfacing, sewers, waterlines, drainage installations and repairs, detention and retention basin maintenance, utility
relocations, traffic signal
installations and
modifications, street
lighting, parks, slurry
seals, and other related
improvements. Our
team provides
inspection services for
encroachment permit,
land development, and
capital improvement
projects. Willdan
currently provides oncall inspection services
to the Cities of Santa
Paula, Fillmore,
Thousand Oaks, and
County of Ventura,
amongst a host of other Southern California agencies.

Labor Compliance Expertise: Willdan has provided Labor Compliance services for over 30 years. Our labor compliance staff have completed monitoring and enforcement assignments for public agencies throughout California. Willdan’s Labor Compliance Management process has been perfected through continual reviews and updates. It maximizes efficiency and minimizes costs while optimizing client comfort. We provide contractor support by phone and email to insure a smooth process throughout the project. Our team can assist the City in compliance with applicable Federal, State, County, and local labor laws.

Proposal for Construction Management
And Inspection Services 25
City of Pico Rivera – Proposal for On-Call Construction Management and Inspection Services Federally Funded Project Expertise: Willdan's proposed team members have extensive experience handling complex public works projects, including those administered by Caltrans, whether state or federally funded. Willdan has detailed knowledge of the current Local Assistance Procedures Manual (LAPM) and can provide project management from the funding procurement stage through project closeout. Several of our construction management staff have completed the Caltrans Resident Engineer Academy. Our proposed team has participated in over 100 successful Caltrans audits and has success managing all types of specially funded projects.

Proposal for Construction Management
And Inspection Services 26
City of Pico Rivera – Proposal for On-Call Construction Management and Inspection Services Client References
Within the past seven years, Willdan has completed task orders for over 200 on-call contracts. This relevant experience of our dedicated and available key personnel includes both federal and non-federal projects – making Willdan highly suited to provide the City with the requested services. Representative contracts are provided below.

On Call Construction Management and Inspection Services – City of Downey Lorena Powell, Senior Civil Engineer
City of Downey
11111 Brookshire Avenue, Downey, CA 90241
(562) 904-7110, [email protected]
Dates: 2018- Present
Key Staff
 Mike Bustos
 Chris Baca
 Mario Cisneros
 Heleo Espinoza
 Simon Hernandez
 Victor Ayala
 Mike Corral
 Oscar Blanco
 Matt Saab
 Otis Chandler
 Dwayne Mozden
Willdan has provided on call construction management and inspection services to the City of Downey since 2018 and has partnered with the City of Downey often over the past 25 years. Representative construction management and inspection projects completed under this on call contract include Woodruff Ave Water System Improvements, Firestone Blvd and Paramount Blvd Intersection Improvements, Samoline Ave and Melva St Water System Improvements, Third St Water System Improvements, Lakewood Blvd Improvements Phase 3C, Lakewood Blvd at Firestone Blvd Water System Improvements, Solar Panel Installations at Multiple City Facilities, Old River School Rd Rehabilitation, Miscellaneous Sewer Repairs, Wilderness Park Sewer Repairs, 4th St Water System Improvements, 5th St Water System Improvements, and Stamps Rd Water System Improvements. Willdan provided construction inspection and materials testing services for each of these projects and construction management for most of these projects.

On Call Multidisciplinary Engineering Services – City of Inglewood Peter Puglese, City Traffic Engineer
City of Inglewood
One Manchester Blvd, Inglewood, CA 90301
(908) 578-4226, [email protected]
Dates: 2006- Present
Key Staff
 Mike Bustos
 Mario Cisneros
 Simon Hernandez
 Matt Saab
 Manny Trujillo
 Jason Brown
 Matthew Villegas
 Carlos Villegas
 Victor Ayala
 Miguel Lopez
 Christopher Villegas
 Masoud Eskandari
Willdan has provided on call engineering services to the City of Inglewood since 2011. In that time, Willdan has completed over 22 projects for the City, providing a multitude of services, such as construction management and inspection, plan checking, design engineering, landscape architectural, surveying, and GIS. Representative construction management and inspection projects completed under this on call contract include La Brea Avenue Reconstruction (DEMO4L), La Brea Avenue Realignment and Reconstruction (HPLUL), Annual Streets and Alleys Rehabilitation, Imperial Highway Improvements, Proposal for Construction Management
And Inspection Services 27
City of Pico Rivera – Proposal for On-Call Construction Management and Inspection Services Prairie Avenue Improvements, Van Ness Avenue Improvements, Inglewood Intermodal Transit/Park and Ride Facility, Service Center Yard Roofing Project, Intelligent Transportation System Gap Closure, Intelligent Transportation System Phases 5 & 6, Los Angeles World Airports Intelligent Transportation System, City Parking Lots Rehabilitation, La Brea and Hardy Traffic Signal Improvements, Century Boulevard Mobility Project Federal Funding Closeout Services, La Tijera Elementary School Improvements (SR2S), and Encroachment Permits Inspection.

On Call Multidisciplinary Engineering Services – City of Ridgecrest Travis Reed, City Engineering/Public Works
Director
City of Ridgecrest
100 West California Ave, Ridgecrest, CA 93555
(661) 478-1965, [email protected]
Dates: 2010- Present
Key Staff
 Mike Bustos
 Mario Cisneros
 Anivel Nunez
 Paul Merrill
 Oscar Blanco
 Matt Saab
 Chad Meelker
 Masoud Eskandari
 Amanda Perez
 Jane Freij
 Mike Corral
Willdan has provided on call engineering services to the City of Ridgecrest since 2010. In that time, Willdan has completed over 75 projects for the City, providing a multitude of services, such as construction management and inspection, plan checking, design engineering, grant administration, labor compliance, city engineering, landscape architectural, surveying, GIS, environmental clearance, building and safety.

We have provided these services to the City for projects funded with local, state, and federal funds.

Representative construction management and inspection projects completed under this on-call contract include Downs Street Widening (STPL), West Ridgecrest Boulevard Reconstruction (RPSTPL), Ridgecrest Senior Center Tenant improvements (CDBG), Electric Vehicle Charging Stations and Solar Photovoltaic Improvements (CMAQ), Corporate Yard Site Improvements, New Bus Maintenance Garage and Shade Structure (Design/Build), ADA Transition Plan (CDBG), Sewer System Rehabilitation and Repair Program, Sewer GIS mapping, Walmart Supercenter Offsite Improvements, Richmond Road Bike Path, Bowman Channel Improvements, Dolphin Avenue Improvements (CMAQ), SSARP, Traffic Signal Installation for China Lake Boulevard at Bowman Road (HSIP), Citywide Telecommunications Installation Permit Inspection, Flashing Stop Signs and Adaptive Traffic Signals (HSIP), and Leroy Jackson Park (Clean CA). On many of these projects, Willdan provided turnkey services including design, environmental, bidding assistance, construction management, inspection, labor compliance, grant administration and materials testing.

Proposal for Construction Management
And Inspection Services 28
City of Pico Rivera – Proposal for On-Call Construction Management and Inspection Services Schedule of Hourly Rates
36 APPENDIX C
NON‐COLLUSION AFFIDAVIT
The undersigned declares states and certifies that:

1. This Proposal is not made in the interest of, or on behalf of any undisclosed person, partnership, company, association, organization or corporation. This Proposal is genuine and not collusive or sham.

2. I have not directly or indirectly induced or solicited any other Proposer to put in a false or sham proposal and I have not directly or indirectly colluded, conspired, connived, or agreed with any other Proposer or anyone else to put in sham proposal or to refrain from submitting to this RFP.

3. I have not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the proposal price or to fix any overhead, profit or cost element of the proposal price or to secure any advantage against the City of Pico Rivera or of anyone interested in the proposed contract.

4. All statements contained in the Proposal and related documents are true.

5. I have not directly or indirectly submitted the proposal price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay any fee to any person, corporation, partnership, company, association, organization, RFP depository, or to any member or agent thereof to effectuate a collusive or sham proposal.

6. I have not entered into any arrangement or agreement with any City of Pico Rivera public officer in connection with this proposal.

7. I understand collusive bidding is a violation of State and Federal law and can result in fines, prison sentences, and civil damage awards.

Signature of Authorized Representative
Name of Authorized Representative Title of Authorized Representative

Ms. Vanessa Muñoz, PE, TE President, CEO
13191 Crossroads Parkway North, Suite 405
Industry, CA 91746-3443
Phone: 562.908.6200
Phone: 800.499.4484
Fax: 562.695.2120
www.willdan.com
Professional Services Agreement

WILLDAN ENGINEERING

Page 16 of 19 ends

EXHIBIT B

APPROVED FEE SCHEDULE
(SCHEDULE OF HOURLY LABOR RATES AND REIMBURSABLE)
Proposal for Construction Management
And Inspection Services 28
City of Pico Rivera – Proposal for On-Call Construction Management and Inspection Services Schedule of Hourly Rates
Professional Services Agreement

WILLDAN ENGINEERING

Page 17 of 19 ends

EXHIBIT C

TERMS FOR COMPLIANCE WITH CALIFORNIA LABOR LAW REQUIREMENTS

1. This Agreement calls for services that, in whole or in part, constitute “public works” as defined in Division 2, Part 7, Chapter 1 (commencing with Section 1720) of the California Labor Code (“Chapter 1”). Further, Consultant acknowledges that this Agreement is subject to (a) Chapter 1 and (b) the rules and regulations established by the Department of Industrial Relations (“DIR”) implementing such statutes. Therefore, as to those Services that are “public works”, Consultant shall comply with and be bound by all the terms, rules and regulations described in 1(a) and 1(b) as though set forth in full herein.

2. California law requires the inclusion of specific Labor Code provisions in certain contracts. The inclusion of such specific provisions below, whether or not required by California law, does not alter the meaning or scope of Section 1 above.

3. Consultant shall be registered with the Department of Industrial Relations in accordance with California Labor Code Section 1725.5, and has provided proof of registration to City prior to the Effective Date of this Agreement. Consultant shall not perform work with any subconsultant that is not registered with DIR pursuant to Section 1725.5. Consultant and subconsultants shall maintain their registration with the DIR in effect throughout the duration of this Agreement. If the Consultant or any subconsultant ceases to be registered with DIR at any time during the duration of the project, Consultant shall immediately notify City.

4. Pursuant to Labor Code Section 1771.4, Consultant’s Services are subject to compliance monitoring and enforcement by DIR. Consultant shall post job site notices, as prescribed by DIR regulations.

5. Pursuant to Labor Code Section 1773.2, copies of the prevailing rate of per diem wages for each craft, classification, or type of worker needed to perform the Agreement are on file at City Hall and will be made available to any interested party on request. Consultant acknowledges receipt of a copy of the DIR determination of such prevailing rate of per diem wages, and Consultant shall post such rates at each job site covered by this Agreement.

6. Consultant shall comply with and be bound by the provisions of Labor Code Sections 1774 and 1775 concerning the payment of prevailing rates of wages to workers and the penalties for failure to pay prevailing wages. The Consultant shall, as a penalty to City, forfeit $200.00 for each calendar day, or portion thereof, for each worker paid less than the prevailing rates as determined by the DIR for the work or craft in which the worker is employed for any public work done pursuant to this Agreement by Consultant or by any subconsultant.

Professional Services Agreement

WILLDAN ENGINEERING

Page 18 of 19 ends

7. Consultant shall comply with and be bound by the provisions of Labor Code Section 1776, which requires Consultant and each subconsultant to: keep accurate payroll records and verify such records in writing under penalty of perjury, as specified in Section 1776; certify and make such payroll records available for inspection as provided by Section 1776; and inform City of the location of the records.

8. Consultant shall comply with and be bound by the provisions of Labor Code seq. concerning the employment of apprentices on public works projects. Consultant shall be responsible for compliance with these aforementioned Sections for all apprenticeable occupations. Prior to commencing work under this Agreement, Consultant shall provide City with a copy of the information submitted to any applicable apprenticeship program. Within 60 days after concluding work pursuant to this Agreement, Consultant and each of its subconsultants shall submit to City a verified statement of the journeyman and apprentice hours performed under this Agreement.

9. The Consultant shall not perform Work with any Subconsultant that has been debarred or suspended pursuant to California Labor Code Section 1777.1 or any other federal or state law providing for the debarment of consultants from public works. The Consultant and Subconsultants shall not be debarred or suspended throughout the duration of this Contract pursuant to Labor Code Section 1777.1 or any other federal or state law providing for the debarment of consultants from public works. If the Consultant or any subconsultant becomes debarred or suspended during the duration of the project, the Consultant shall immediately notify City.

10. Consultant acknowledges that eight hours labor constitutes a legal day’s work. Consultant shall comply with and be bound by Labor Code Section 1810.

Consultant shall comply with and be bound by the provisions of Labor Code Section 1813 concerning penalties for workers who work excess hours. The Consultant shall, as a penalty to City, forfeit $25.00 for each worker employed in the performance of this Agreement by the Consultant or by any subconsultant for each calendar day during which such worker is required or permitted to work more than eight hours in any one calendar day and 40 hours in any one calendar week in violation of the provisions of Division 2, Part 7, Chapter 1, Article 3 of the Labor Code. Pursuant to Labor Code section 1815, work performed by employees of Consultant in excess of eight hours per day, and 40 hours during any one week shall be permitted upon public work upon compensation for all hours worked in excess of eight hours per day at not less than one and one-half times the basic rate of pay.

11. California Labor Code Sections 1860 and 3700 provide that every employer will be required to secure the payment of compensation to its employees. In accordance with the provisions of California Labor Code Section 1861, Consultant hereby certifies as follows:
“I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the Professional Services Agreement

WILLDAN ENGINEERING

Page 19 of 19 ends

provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract.”

12. For every subconsultant who will perform work on the project, Consultant shall be responsible for such subconsultant’s compliance with Chapter 1 and Labor Code Sections 1860 and 3700, and Consultant shall include in the written contract between it and each subconsultant a copy of those statutory provisions and a requirement that each subconsultant shall comply with those statutory provisions. Consultant shall be required to take all actions necessary to enforce such contractual provisions and ensure subconsultant’s compliance, including without limitation, conducting a periodic review of the certified payroll records of the subconsultant and upon becoming aware of the failure of the subconsultant to pay his or her workers the specified prevailing rate of wages.

Consultant shall diligently take corrective action to halt or rectify any failure.

13. To the maximum extent permitted by law, Consultant shall indemnify, hold harmless and defend (at Consultant’s expense with counsel reasonably acceptable to City) City, its officials, officers, employees, agents and independent consultants serving in the role of City officials, and volunteers from and against any demand or claim for damages, compensation, fines, penalties or other amounts arising out of or incidental to any acts or omissions listed above by any person or entity (including Consultant, its subconsultants, and each of their officials, officers, employees and agents) in connection with any work undertaken or in connection with the Agreement, including without limitation the payment of all consequential damages, attorneys’ fees, and other related costs and expenses. All duties of Consultant under this Section shall survive the termination of the Agreement.

AGREEMENT NO. _______

PROFESSIONAL SERVICES AGREEMENT

BETWEEN THE CITY OF PICO RIVERA AND
FCG CONSULTANTS, INC.

1. IDENTIFICATION
THIS PROFESSIONAL SERVICES AGREEMENT (“Agreement”) is entered into by and between the City of Pico Rivera, a California municipal corporation (“City”) and FCG Consultants, Inc., (“Consultant”). City and Consultant are sometimes hereinafter individually referred to as a “Party” and collectively referred to as “Parties.”

2. RECITALS

2.1 City has determined that it requires professional services from a consultant to provide on-call construction management services.

2.2 Consultant represents that it is fully qualified to perform such professional services by virtue of its experience and the training, education and expertise of its principals and employees. Consultant further represents that it is willing to accept responsibility for performing such services in accordance with the terms and conditions set forth in this Agreement.

NOW, THEREFORE, for and in consideration of the performance by the Parties of the mutual covenants and conditions herein contained, the Parties hereto agree as follows:

3. DEFINITIONS

3.1 “Scope of Services”: Such professional services as are set forth in the Consultant’s February 7, 2024 proposal to City attached hereto as Exhibit “A” and incorporated herein by this reference.

3.2 “Approved Fee Schedule”: Such compensation rates as are set forth in the Consultant’s February 7, 2024 proposal to City attached hereto as Exhibit “B.”

3.3 “Commencement Date” : March 26, 2024

3.4 “Expiration Date” : June 30, 2029

4. TERM
The term of this Agreement shall commence at 12:00 a.m. on the Commencement Date and shall expire at 11:59 p.m. on the Expiration Date unless extended by written agreement of the Parties or terminated in accordance with Section 22 below.

Enclosure 1
9b
Professional Services Agreement
FCG CONSULTANTS, INC.

Page 2 of 19 ends

5. CONSULTANT’S SERVICES

5.1 Consultant shall perform the services identified in the Scope of Services. City shall have the right to request, in writing, changes in the Scope of Services. Any such changes mutually agreed upon by the Parties, and any corresponding increase or decrease in compensation, shall be incorporated by written amendment to this Agreement. In no event shall the total compensation and costs payable to Consultant under this Agreement exceed the sum of $$2,500,000, Two Million Five Hundred Thousand Dollars, unless specifically approved in advance, in writing, by City.

5.2 Consultant shall perform all work to the highest professional standards of Consultant’s profession and in a manner reasonably satisfactory to City.

6. COMPENSATION

6.1 City agrees to compensate Consultant for the services provided under this Agreement, and Consultant agrees to accept in full satisfaction for such services, payment in accordance with the Approved Fee Schedule.

6.2 Consultant shall submit to City an invoice, on a monthly basis or less frequently, for the services performed pursuant to this Agreement. Each invoice shall itemize the services rendered during the billing period and the amount due. Within ten (10) business days of receipt of each invoice, City shall notify Consultant in writing of any disputed amounts included on the invoice. Within thirty (30) calendar days of receipt of each invoice, City shall pay all undisputed amounts included on the invoice. City shall not withhold applicable taxes or other authorized deductions from payments made to Consultant.

6.3 Payments for any services requested in writing by City and not included in the Scope of Services shall be made to Consultant by City on a time-and-materials basis using Consultant’s standard fee schedule. Fees for such additional services shall be paid within sixty (60) days of the date Consultant issues an invoice to City for such services.

7. BUSINESS LICENSE
Consultant shall obtain a City of Pico Rivera business license prior to commencing performance under this Agreement.

8. COMPLIANCE WITH LAWS
Consultant shall keep informed of State, Federal and Local laws, ordinances, codes and regulations that in any manner affect those employed by it or in any way affect the performance of its services pursuant to this Agreement. Consultant shall at all times comply with such laws, ordinances, codes and regulations. Without limiting the generality Professional Services Agreement
FCG CONSULTANTS, INC.

Page 3 of 19 ends

of the foregoing, if Consultant is an out-of-state corporation or LLC, it must be qualified and registered to do business in the State of California pursuant to sections 2105 and 17708.02 of the California Corporations Code. The City, its officers and employees shall not be liable at law or in equity occasioned by failure of Consultant to comply with this Section.

9. CONFLICT OF INTEREST
Consultant covenants that it presently has no interest and shall not acquire any interest, direct or indirect, which may be affected by the services to be performed by Consultant under this Agreement, or which would conflict in any manner with the performance of its services hereunder. During the term of this Agreement, Consultant shall not perform any work for another person or entity for whom Consultant was not working at the Commencement Date of this Agreement if both: (i) such work would require Consultant to abstain from a decision under this Agreement pursuant to a conflict of interest statute; and (ii) City has not consented in writing prior to Consultant’s performance of such work.

10. PERSONNEL
Consultant represents that it has, or will secure at its own expense, all personnel required to perform the services identified in the Scope of Services. All such services shall be performed by Consultant or under its supervision, and all personnel engaged in the work shall be qualified to perform such services. Consultant reserves the right to determine the assignment of its own employees to the performance of Consultant’s services under this Agreement, but City reserves the right, for good cause, to require Consultant to exclude any employee from performing services on City’s premises. A.B.

Fakhouri, Construction Manager, shall be Consultant’s project administrator and shall have direct responsibility for management of Consultant’s performance under this Agreement. No change shall be made to Consultant’s project administrator without City’s prior written consent.

11. OWNERSHIP OF WRITTEN PRODUCTS
All reports, documents or other written material (“written products”) developed by Consultant in the performance of this Agreement shall be and remain the property of City without restriction or limitation upon its use or dissemination by City. Consultant may take and retain copies of such written products as desired, but no such written products shall be the subject of a copyright application by Consultant. If any state, federal, or local law requires mandatory copyright protection for Consultant’s work product, City shall comply with such laws to the extent feasible.

12. INDEPENDENT CONSULTANT
Professional Services Agreement
FCG CONSULTANTS, INC.

Page 4 of 19 ends

12.1 Consultant is, and shall at all times remain as to City, a wholly independent consultant. Consultant shall have no power to incur any debt, obligation, or liability on behalf of City or otherwise to act on behalf of City as an agent. Neither City nor any of its officers, employees or agents shall have control over the conduct of Consultant or any of Consultant’s employees, except as set forth in this Agreement. Consultant shall not at any time represent that it is, or that any of its agents or employees are, in any manner employees of City. 12.2 The Parties further acknowledge and agree that nothing in this Agreement shall create or be construed to create a partnership, joint venture, employment relationship, joint-employer relationship, or any other relationship between Consultant or Consultant’s employees except as set forth in this Agreement.

12.2 City shall have no direct or indirect control over Consultant’s employees or sub-consultants with respect to wages, hours, and working conditions. In addition, City shall not deduct from the Compensation paid to Consultant any sums required for Social Security, withholding taxes, FICA, state disability insurance or any other federal, state or local tax or charge which may or may not be in effect or hereinafter enacted or required as a charge or withholding on the compensation paid to Consultant, Consultant’s employees or subconsultants. City shall have no responsibility to provide Consultant, its employees or subconsultants with workers’ compensation insurance or any other insurance.

13. CONFIDENTIALITY
All data, documents, discussion, or other information developed or received by Consultant or provided for performance of this Agreement are deemed confidential and shall not be disclosed by Consultant without prior written consent by City. City shall grant such consent if disclosure is legally required. Upon request, all City data and any copies thereof shall be returned to City upon the termination or expiration of this Agreement.

14. NON-LIABILITY OF CITY OFFICIALS AND EMPLOYEES
No official or employee of the City shall be personally liable to Consultant in the event of any default or breach by City, or for any amount which may become due to Consultant.

15. INDEMNIFICATION

15.1 The Parties agree that City, its officers, agents, elected and appointed officials, employees, affiliated public agencies and volunteers should, to the extent permitted by law, be fully protected from any loss, injury, damage, claim, lawsuit, cost, expense, attorneys’ fees, litigation costs, or any other cost arising out of or in any way related to the performance of this Agreement. Accordingly, the provisions of this indemnity provision are intended by the Parties to be interpreted and construed to provide the fullest protection possible under the law to City. Consultant acknowledges that City would not enter into this Agreement in the absence of Consultant’s commitment to indemnify and Professional Services Agreement
FCG CONSULTANTS, INC.

Page 5 of 19 ends

protect City as set forth herein. Notwithstanding the foregoing, to the extent Consultant's services are subject to Civil Code Section 2782.8, the above indemnity shall be limited, to the extent required by Civil Code Section 2782.8, to claims that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant.

15.2 To the full extent permitted by law, Consultant shall indemnify, hold harmless and defend City, its officers, agents, elected and appointed officials, employees, affiliated public agencies and volunteers from and against any and all claims, demands, lawsuits, causes of action, losses, costs or expenses for any damage due to death or injury to any person and injury to any property resulting from or arising out of any alleged intentional, reckless, negligent, or otherwise wrongful acts, errors or omissions of Consultant or any of its officers, employees, servants, agents, or subconsultants in the performance of this Agreement. Such costs and expenses shall include reasonable attorneys’ fees incurred by counsel of City’s choice and expert witness fees and consultant fees. Notwithstanding the foregoing, to the extent Consultant's Services are subject to Civil Code Section 2782.8, the above indemnity shall be limited, to the extent required by Civil Code Section 2782.8, to claims that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant.

15.3 City shall have the right to offset against the amount of any compensation due Consultant under this Agreement any amount due to City from Consultant as a result of Consultant’s failure to pay City promptly any indemnification arising under this Section 15 or related to Consultant’s failure to either: (i) pay taxes on amounts received pursuant to this Agreement or (ii) comply with applicable workers’ compensation laws.

15.4 The obligations of Consultant under this Section 15 will not be limited by the provisions of any workers’ compensation act or similar act. Consultant expressly waives its statutory immunity under such statutes or laws as to City, its officers, agents, employees and volunteers.

15.5 Consultant agrees to obtain executed indemnity agreements with provisions identical to those set forth here in this Section 15 from each and every subconsultant or any other person or entity involved by, for, with or on behalf of Consultant in the performance of this Agreement. In the event Consultant fails to obtain such indemnity obligations from others as required herein, Consultant agrees to be fully responsible and indemnify, hold harmless and defend City, its officers, agents, elected and appointed officials, employees, affiliated public agencies and volunteers from and against any and all claims, demands, lawsuits, causes of action, losses, costs or expenses for any damage due to death or injury to any person and injury to any property resulting from or arising out of any alleged intentional, reckless, negligent, or otherwise wrongful acts, errors or omissions of Consultant’s subconsultants or any other person or entity involved by, for, with or on behalf of Consultant in the performance of this Agreement. Such costs Professional Services Agreement
FCG CONSULTANTS, INC.

Page 6 of 19 ends

and expenses shall include reasonable attorneys’ fees incurred by counsel of City’s choice and expert witness fees and consultant fees.

15.6 City does not, and shall not, waive any rights that it may possess against Consultant because of the acceptance by City, or the deposit with City, of any insurance policy or certificate required pursuant to this Agreement. This hold harmless and indemnification provision shall apply regardless of whether or not any insurance policies are determined to be applicable to the claim, demand, damage, liability, loss, cost or expense.

15.7 PERS ELIGIBILITY INDEMNITY. In the event that Consultant or any employee, agent, or subconsultant of Consultant providing services under this Agreement claims or is determined by a court of competent jurisdiction or the California Public Employees Retirement System (PERS) to be eligible for enrollment in PERS as an employee of the City, Consultant shall indemnify, defend, and hold harmless City for the payment of any employee and/or employer contributions for PERS benefits on behalf of Consultant or its employees, agents, or subconsultants, as well as for the payment of any penalties and interest on such contributions, which would otherwise be the responsibility of City.

Notwithstanding any other agency, state or federal policy, rule, regulation, law or ordinance to the contrary, Consultant and any of its employees, agents, and subconsultants providing service under this Agreement shall not qualify for or become entitled to, and hereby agree to waive any claims to, any compensation, benefit, or any incident of employment by City, including but not limited to eligibility to enroll in PERS as an employee of City and entitlement to any contribution to be paid by City for employer contribution and/or employee contributions for PERS benefits.

16. INSURANCE

16.1 During the term of this Agreement, Consultant shall carry, maintain, and keep in full force and effect insurance against claims for death or injuries to persons or damages to property that may arise from or in connection with Consultant’s performance of this Agreement. Such insurance shall be of the types and in the amounts as set forth below:

16.1.1 Comprehensive general liability, and Umbrella or Excess Liability Insurance covering all operations by or on behalf of Consultant providing insurance for bodily injury liability and property damage liability for the following and including coverage for:

16.1.1.1 Premises, operations, and mobile equipment

16.1.1.2 Products and completed operations
Professional Services Agreement
FCG CONSULTANTS, INC.

Page 7 of 19 ends

16.1.1.3 Broad form property damage (including completed operations)

16.1.1.4 Explosion, collapse, and underground hazards

16.1.1.5 Personal Injury

16.1.1.6 Contractual liability
in the amount of One Million Dollars ($1,000,000) per occurrence combined single limit; Two Million Dollars ($2,000,000) aggregate for products/completed operation; Two Million Dollars ($2,000,000) general aggregate (General aggregate must apply separately to Consultant’s work under this Agreement.); and Five Million Dollars ($5,000,000) umbrella or excess liability.

16.1.2 Automobile Liability Insurance for owned, hired and non-owned vehicles utilized by Consultant, its employees or subconsultants, in the amount of One Million Dollars ($1,000,000) per accident for bodily injury and property damage.

16.1.3 Worker’s Compensation Insurance as required by the laws of the State of California, with Statutory Limits, and Employer's Liability Insurance with limit of no less than One Million Dollars ($1,000,000) per accident for bodily injury or disease.

16.1.4 Professional Liability Insurance against errors and omissions in the performance of the work under this Agreement with coverage limits of not less than One Million Dollars ($1,000,000) per occurrence of claim/ Two Million Dollars ($2,000,000) in the aggregate.

16.2 Consultant shall require each of its subconsultants, if any, to maintain insurance coverage that meets all of the requirements of this Agreement.

16.3 The policy or policies required by this Agreement shall be issued by an insurer admitted in the State of California and with a rating of at least A:VII in the latest edition of Best’s Insurance Guide.

16.4 Consultant agrees that if it does not keep the aforesaid insurance in full force and effect City may either: (i) immediately terminate this Agreement; or (ii) take out the necessary insurance and pay, at Consultant’s expense, the premium thereon.

16.5 At all times during the term of this Agreement, Consultant shall maintain on file with City’s Risk Manager a certificate or certificates of insurance showing that the aforesaid policies are in effect in the required amounts and, for the general liability and automobile liability policies, naming the City as an additional insured. Consultant shall, prior to commencement of work under this Agreement, file with City’s Risk Manager such Professional Services Agreement
FCG CONSULTANTS, INC.

Page 8 of 19 ends

certificate(s).

16.6 Consultant shall provide proof that policies of insurance required herein expiring during the term of this Agreement have been renewed or replaced with other policies providing at least the same coverage. Consultant shall provide such proof to City at least two weeks prior to the expiration of the coverages.

16.7 The general liability and automobile policies of insurance required by this Agreement shall contain an endorsement naming City, its officers, employees, agents and volunteers as additional insureds. All of the policies required under this Agreement shall contain an endorsement providing that the policies cannot be canceled or reduced except on thirty days’ prior written notice to City. Consultant agrees to require its insurer to modify the certificates of insurance to delete any exculpatory wording stating that failure of the insurer to mail written notice of cancellation imposes no obligation, and to delete the word “endeavor” with regard to any notice provisions.

16.8 The general liability and automobile policies of insurance provided by Consultant shall be primary to any coverage available to City. Any insurance or selfinsurance maintained by City, its officers, employees, agents or volunteers, shall be in excess of Consultant’s insurance and shall not contribute with it.

16.9 All insurance coverage provided pursuant to this Agreement shall not prohibit Consultant, and Consultant’s employees, agents or subconsultants, from waiving the right of subrogation prior to a loss. Consultant hereby waives all rights of subrogation against the City.

16.10 Any deductibles or self-insured retentions must be declared to and approved by the City. At the option of City, Consultant shall either reduce or eliminate the deductibles or self-insured retentions with respect to City, or Consultant shall procure a bond guaranteeing payment of losses and expenses.

16.11 Procurement of insurance by Consultant shall not be construed as a limitation of Consultant’s liability or as full performance of Consultant’s duties to indemnify, hold harmless and defend under Section 15 of this Agreement.

16.12 If Consultant maintains broader coverage and/or higher limits than the minimums shown above, the City requires and shall be entitled to the broader coverage and/or the higher limits maintained by the Consultant. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City.

17. MUTUAL COOPERATION

17.1 City shall provide Consultant with all pertinent data, documents and other requested information as is reasonably available to City for the proper performance of Consultant’s services under this Agreement.

Professional Services Agreement
FCG CONSULTANTS, INC.

Page 9 of 19 ends

17.2 In the event any claim or action is brought against City relating to Consultant’s performance in connection with this Agreement, Consultant shall render any reasonable assistance that City may require.

18. RECORDS AND INSPECTIONS
Consultant shall maintain full and accurate records with respect to all matters covered under this Agreement for a period of three years after the expiration or termination of this Agreement. City shall have the right to access and examine such records, without charge, during normal business hours. City shall further have the right to audit such records, to make transcripts therefrom and to inspect all program data, documents, proceedings, and activities.

19. PERMITS AND APPROVALS
Consultant shall obtain, at its sole cost and expense, all permits and regulatory approvals necessary in the performance of this Agreement. This includes, but shall not be limited to, encroachment permits and building and safety permits and inspections.

20.NOTICES
Any notices, bills, invoices, or reports required by this Agreement shall be deemed received on: (i) the day of delivery if delivered by hand, facsimile, email, or overnight courier service during Consultant’s and City’s regular business hours; or (ii) on the third business day following deposit in the United States mail if delivered by mail, postage prepaid, to the addresses listed below (or to such other addresses as the Parties may, from time to time, designate in writing).

If to City: If to Consultant:

Steve Carmona, City Manager
City of Pico Rivera
PO Box 1016
6615 Passons Blvd.

Pico Rivera, California 90660-1016
Maha Alfakhouri, President/CEO
FCG Consultants, Inc.
22885 Savi Ranch Pkwy, Suite G
Yorba Linda, CA 92887
With a courtesy copy to:

Arnold M. Alvarez-Glasman, City Attorney
13181 Crossroads Parkway North
Suite 400 - West Tower
City of Industry, CA 91746
Professional Services Agreement
FCG CONSULTANTS, INC.

Page 10 of 19 ends

21. SURVIVING COVENANTS
The Parties agree that the covenants contained in Sections 13, 15 and Paragraph

17.2 of Section 17, of this Agreement shall survive the expiration or termination of this Agreement.

22. TERMINATION

22.1 City shall have the right to terminate this Agreement for any reason on five (5) calendar days’ written notice to Consultant. Consultant shall have the right to terminate this Agreement for any reason on sixty (60) calendar days’ written notice to City. The effective date of termination shall be upon the date specified in the notice of termination.

Consultant agrees that in the event of such termination, City’s obligation to pay Consultant shall be limited to payment only for those services satisfactorily rendered, as solely determined by the City, prior to the effective date of termination. Consultant agrees to cease all work under this Agreement on or before the effective date of any notice of termination. All City data, documents, objects, materials or other tangible things shall be returned to City upon the termination or expiration of this Agreement.

22.2 If City terminates this Agreement due to no fault or failure of performance by Consultant, then Consultant shall be paid based on the work satisfactorily performed, as solely determined by the City, at the time of termination. In no event shall Consultant be entitled to receive more than the amount that would be paid to Consultant for the full performance of the services required by this Agreement.

23. ASSIGNMENT
Consultant shall not delegate, transfer, subcontract or assign its duties or rights hereunder, either in whole or in part, without City’s prior written consent, and any attempt to do so shall be void and of no effect. City shall not be obligated or liable under this Agreement to any Party other than Consultant.

24. NON-DISCRIMINATION AND EQUAL EMPLOYMENT OPPORTUNITY

24.1 In the performance of this Agreement, Consultant shall not discriminate against any employee, subconsultant, or employment applicant because of race, color, creed, religion, sex, marital status, national origin, ancestry, age, physical or mental handicap, medical condition or sexual orientation. Consultant will take affirmative action to ensure that subconsultants, employees, and employment applicants are treated without regard to their race, color, creed, religion, sex, marital status, national origin, ancestry, age, physical or mental handicap, medical condition or sexual orientation.

24.2 Consultant will, in all solicitations or advertisements for employees placed by or on behalf of Consultant state either that it is an equal opportunity employer or that all qualified applicants will receive consideration for employment without regard to race, Professional Services Agreement
FCG CONSULTANTS, INC.

Page 11 of 19 ends

color, creed, religion, sex, marital status, national origin, ancestry, age, physical or mental handicap, medical condition or sexual orientation.

24.3 Consultant will cause the foregoing provisions to be inserted in all subcontracts for any work covered by this Agreement except contracts or subcontracts for standard commercial supplies or raw materials.

25. WARRANTIES

25.1 Each Party has received independent legal advice from its attorneys with respect to the advisability of entering into and executing this Agreement, or been provided with an opportunity to receive independent legal advice and has freely and voluntarily waived and relinquished the right to do so. Each Party who has not obtained independent counsel acknowledges that the failure to have independent legal counsel will not excuse such Party’s failure to perform under this Agreement.

25.2 In executing this Agreement, each Party has carefully read this Agreement, knows the contents thereof, and has relied solely on the statements expressly set forth herein and has placed no reliance whatsoever on any statement, representation, or promise of any other party, or any other person or entity, not expressly set forth herein, nor upon the failure of any other party or any other person or entity to make any statement, representation or disclosure of any matter whatsoever.

25.3 It is agreed that each Party has the full right and authority to enter into this Agreement, and that the person executing this Agreement on behalf of either Party has the full right and authority to fully commit and bind such Party to the provisions of this Agreement.

26. CAPTIONS

26.1 The captions appearing at the commencement of the sections hereof, and in any paragraph thereof, are descriptive only and for convenience in reference to this Agreement. Should there be any conflict between such heading, and the section or paragraph thereof at the head of which it appears, the section or paragraph thereof, as the case may be, and not such heading, shall control and govern in the construction of this Agreement.

26.2 Masculine or feminine pronouns shall be substituted for the neuter form and vice versa, and the plural shall be substituted for the singular form and vice versa, in any place or places herein in which the context requires such substitution(s).

Professional Services Agreement
FCG CONSULTANTS, INC.

Page 12 of 19 ends

27. NON-WAIVER

27.1 The waiver by City or Consultant of any breach of any term, covenant or condition herein contained shall not be deemed to be a waiver of such term, covenant or condition or of any subsequent breach of the same or any other term, covenant or condition herein contained. In no event shall the making by City of any payment to Consultant constitute or be construed as a waiver by City of any breach of covenant, or any default which may then exist on the part of Consultant, and the making of any such payment by City shall in no way impair or prejudice any right or remedy available to City with regard to such breach or default. No term, covenant or condition of this Agreement shall be deemed to have been waived by City or Consultant unless in writing.

27.2 Each right, power and remedy provided for herein or now or hereafter existing at law, in equity, by statute, or otherwise shall be cumulative and shall be in addition to every other right, power, or remedy provided for herein or now or hereafter existing at law, in equity, by statute, or otherwise. The exercise, the commencement of the exercise, or the forbearance of the exercise by any Party of any one or more of such rights, powers or remedies shall not preclude the simultaneous or later exercise by such Party of any of all of such other rights, powers or remedies.

27.3 Consultant shall not be liable for any failure to perform if Consultant presents acceptable evidence, in City’s sole judgment, that such failure was due to causes beyond the control and without the fault or negligence of Consultant.

28. COURT COSTS AND ATTORNEY FEES
In the event legal action shall be necessary to enforce any term, covenant or condition herein contained, the Party prevailing in such action, whether reduced to judgment or not, shall be entitled to its reasonable court costs, including accountants’ fees and expert witness fees, if any, and attorneys’ fees expended in such action. The venue for any litigation shall be Los Angeles County, California.

29. SEVERABILITY
If any term or provision of this Agreement or the application thereof to any person or circumstance shall, to any extent, be invalid or unenforceable, then such term or provision shall be amended to, and solely to, the extent necessary to cure such invalidity or unenforceability, and in its amended form shall be enforceable. In such event, the remainder of this Agreement, or the application of such term or provision to persons or circumstances other than those as to which it is held invalid or unenforceable, shall not be affected thereby, and each term and provision of this Agreement shall be valid and be enforced to the fullest extent permitted by law.

Professional Services Agreement
FCG CONSULTANTS, INC.

Page 13 of 19 ends

30. GOVERNING LAW
This Agreement shall be governed and construed in accordance with the laws of the State of California.

31. COUNTERPARTS
This Agreement may be signed in any one or more counterparts all of which taken together shall be but one and the same Agreement. Any signed copy of this Agreement or of any other document or agreement referred to herein, or copy or counterpart thereof, delivered by facsimile or email transmission, shall for all purposes be treated as if it were delivered containing an original manual signature of the Party whose signature appears in the facsimile or email and shall be binding upon such Party in the same manner as though an originally signed copy had been delivered.

32. ENTIRE AGREEMENT
All documents referenced as exhibits in this Agreement are hereby incorporated in this Agreement. In the event of any material discrepancy between the express provisions of this Agreement and the provisions of any document incorporated herein by reference, the provisions of this Agreement shall prevail. This instrument contains the entire Agreement between City and Consultant with respect to the transactions contemplated herein. No other prior oral or written agreements are binding upon the Parties.

Amendments hereto or deviations herefrom shall be effective and binding only if made in writing and executed by City and Consultant.
[This space is intentionally left blank]
Professional Services Agreement
FCG CONSULTANTS, INC.

Page 14 of 19 ends

TO EFFECTUATE THIS AGREEMENT, the Parties have caused their duly authorized representatives to execute this Agreement on the dates set forth below. “CITY” “CONSULTANT”
CITY OF PICO RIVERA FCG CONSULTANTS, INC.
______________________________ ___________________________________ Andrew C. Lara, Mayor Maha Alfakhouri, President/CEO
Dated: ________________________ Dated: _____________________________ ATTEST: APPROVED AS TO FORM:
___________________________ ___________________________________ Cynthia Ayala, City Clerk Arnold M. Alvarez-Glasman, City Attorney Professional Services Agreement
FCG CONSULTANTS, INC.

Page 15 of 19 ends

EXHIBIT A

SCOPE OF SERVICES

PROPOSAL
to provide
On- Call Construction Management and
Inspection Services
Prepared for the
City of Pico Rivera
February 7, 2024
City of Pico Rivera – RFP for
On-Call Construction Management and Inspection Services

LETTER OF OFFER
February 6, 2024
Mr. Noe Negrete
Director of Public Works
City of Pico Rivera
Public Works Department
6615 Passons Boulevard
Pico Rivera, CA 90660
Subject: On-Call Construction Management & Inspection Services Dear Mr. Negrete:
The City of Pico Rivera (City) is seeking proposals from consultants for Construction Management and Inspection Services. FCG Consultants, Inc. (FCG) has been providing on-call project management, construction management, and inspection services to California cities and counties for 13 years. Highlighted below are just a few of the advantages that FCG offers.

Highly Skilled Construction Managers/Inspectors. Our proposed Principal Engineer, A.B. Fakhouri, PE, is a former Resident Engineer of Caltrans District 7 and has nearly 27 years of experience specializing in public works capital improvement projects. Supported by our key team members who have many years of combined experience in the field of construction. They are highly knowledgeable of local codes and regulations. All proposed staff have many years of experience working on public works projects involving transportation and water infrastructure, utilities, and facilities/structures.

Staffing Resources. Our corporate-wide bench of staffing resources encompasses licensed and certified technical experts and specialists in project management, construction management, and construction inspection services. FCG has the resources to provide all the services necessary for the City’s On-Call Construction management and Inspection services contract and has included sub-consultants on our team to strengthen our bench of resources. FCG offers technical experts in Construction Management, Construction Inspection, Document Control, Contract Administration, Labor Compliance, and Project Close-out. Our subconsultants provide Construction Management, Inspection Services, Claims Mitigation, Structure Representatives, Structures Inspection, and Materials Testing.

Subconsultants. Our team is composed of the following firms:

Hill International, Inc., Construction Management / Construction Inspection Contact: Juan Pablo (J.P.) Villamizar, Senior Vice President, (949) 748-5485, [email protected] Address: 12130 Santa Margarita Court, Rancho Cucamonga, CA 91730 PMCS Group, Inc., Construction Management / Construction Inspection Contact: Lauren Weiss, Business Development Director, (661) 310-6104, [email protected] Address: 2600 E. Pacific Coast Highway, Suite 160, Long Beach, CA 90804 Pacific Pros, Inc., Construction Management / Structures Contact: Ryan Kash, Principal, (949) 535-0533, [email protected] Address: 18 Crestview, Also Viejo, CA 92656
Firm Information
Contact:

Maha Alfakhouri; President / CEO
(714) 312-0317
[email protected]
Years in Business:
13 years
Website:

WWW.fcgconsultants.com
Firm Location:
22885 Savi Ranch Pkwy, Suite G
Yorba Linda, California 92887
Form of Organization:

California S Corporation
Number of Employees:
25 Full-time employees
5 Part-time employees
Registration
DIR # 1000018164
DBE # 46140
Federal ID # 27-3911217

Page 1 ends

City of Pico Rivera – RFP for
On-Call Construction Management and Inspection Services

LETTER OF OFFER
CEM, Inc., Claims Management / Scheduling
Contact: Saeid Asgari, PE, Project Manager, (949) 379-4481, [email protected] Address: 14252 Culver Drove, Irvine, CA 92604
Samsa Engineering, Inc., Construction Management / Construction Inspection Contact: Samar Saad, PE, Principal, (714) 475-4706, [email protected] Address: 17011 Beach Blvd., Suite 900, Huntington Beach CA 92708 Destination Enterprises, Inc., Construction Management / Construction Inspection Contact: Marcy Szarama, Principal, (310) 439-2655, [email protected] Address: 11940 Hammack Street, Culver City, CA 90230
RMA Group, Inc., Construction Management / Construction Inspection Contact: Tim Saenz, Business Development / Project Coordinator, (909) 989-1751, [email protected] Address: 12130 Santa Margarita Court, Rancho Cucamonga, CA 91730 Availability & Commitment. FCG understands the importance of this RFP to the City. The City of Pico Rivera can be assured that FCG is dedicated to proposing professional team members that have the qualifications, experience, and skills necessary to successfully complete the scope of work on schedule and within budget. Having completed numerous roadways, structure, landscaping & irrigation, lighting, and traffic signal improvement projects, our public works experienced staff are available, ready to assist on this assignment, and able to handle several active projects concurrently should the need arise.

FCG has read and will comply with all terms and conditions of the RFP and acknowledges the receipt of Q & A dated January 31, 2024. This proposal shall remain valid for a period of not less than 90 days from the date of submittal. FCG attests that all information submitted with the proposal is true and correct. If there are any questions regarding this proposal, please contact me at (714) 312-0317 or [email protected] with any questions you may have.

Sincerely,
Maha Fakhouri
President & CEO

Page 2 ends

City of Pico Rivera – RFP for
On-Call Construction Management and Construction Inspection Services

QUALIFICATION OF THE FIRM

FIRM PROFILE
FCG Consultants, Inc. (FCG) a woman-owned California Corporation and Certified Small Business (SBE) and Disadvantaged business Enterprise (DBE), is focused on providing client-driven solutions to assist clients in navigating through a very challenging economy. FCG, founded in 2009, is headquartered in Yorba Linda, California with a staff of twenty-three fully dedicated personnel providing Construction Engineering, Construction Management, and Construction Inspection to clients throughout California. The firm specializes in Project and Construction Management and Inspection for various types of public works clients utilizing assorted standards such as Caltrans, Local Assistance Procedures Manual, FHWA, Greenbook, and AWWA. FCG staff are highly experienced with inspection of roadway improvements, traffic signal improvements, drainage systems, utilities, facilities, ADA ramps, retaining walls, MSE walls, soil nail walls, Structural Steel/Bolting/Welding, pedestrian/bikeways, wet CIDH pile, stainless steel, electrical, landscape, SWPPP, and Safety.

FCG serves its clients from two locations, Yorba Linda and Norwalk. With thirty (30) employees in both locations, we can cover a larger geographic market to better serve our clients. FCG’s construction engineering and inspection team provides a full scope of services, from project development through project closeout to providing costeffective and functional solutions. The FCG Team carefully plans and tailors the scope for each assignment, specific to the client and project needs. We are fully dedicated to achieving every project and client goal and standard.

Financial Condition: FCG is financially sound and has no bankruptcy, pending litigation, planned office closures, or impending mergers. FCG is not prohibited from professional practice or working with any Federal, State, local or public agency.

Similar and Government Agency Experience: Our previous experience and ability to mobilize quickly and keep the project momentum moving forward allows us to present City of Pico Rivera with a quality team that can work together to deliver a project successfully and on-time. The FCG Team members have worked on two projects with the City of Pico Rivera: Telegraph Road Traffic Safety Enhancements Project and Various Traffic Signal Improvements Project. The FCG Team provided Construction Management, Inspection, and Materials Testing services on both contracts and were able to successfully deliver both projects. The Telegraph XX Project was a joint venture between the Cities of Pico Rivera and Downey and the Signal Improvements Project was City of Pico Rivera Only. However, both projects were Federally Funded where the FCG Team performed full contract administration in accordance with FHWA and LAPM requirements and the FCG Team completed all documents and federal reviews timely.

Differentiator: FCG staff can efficiently staff projects with the most committed, experienced, and knowledgeable staff with relevant experience to each project. The FCG Team can provide large business service with a team of multi-discipline professionals; however, what differentiates our firm from others is having the ability to provide a small business, clientfocused, and customer-service approach to deliver each client the one-on-one attention needed to specifically tailor costeffective solutions and solve project needs.

Our personnel are highly qualified and experienced in their respective disciplines. Each of their qualifications illustrate multiple projects, past and present, they have worked on. We are proposing a sum of experienced candidates with the appropriate experience, as per the city’s requirements and the RFP, who are ready and available to be deployed. This pursuit is a team effort and FCG is committed to ensuring the City of Pico Rivera receives the highest quality service from the appropriate. Our team is always equipped and ready to tackle all projects within hours.

Firm Information
Contact Information:

Maha Alfakhouri, President/CEO
[email protected]
Phone: (714) 312-0317
Fax: (714) 312-0793
Firm Location:

Head Office: 22885 Savi Ranch
Pkwy, Suite G, Yorba Linda,
California 92887
Branch Office: 12440 Firestone
Blvd.#2008, Norwalk, CA 90650
Form of Organization:

California S Corporation
Number of Employees:
25 Full-time employees
5 Part-time employees
Registration
DIR # 1000018164
SBE/DBE # 46140
Federal ID # 27-3911217

Page 3 ends

City of Pico Rivera – RFP for
On-Call Construction Management and Construction Inspection Services

QUALIFICATION OF THE FIRM

PROJECT MANAGER EXPERIENCE AND RELEVANT PROJECT EXPERIENCE Mr. A.B. Fakhouri, PE, QSD, is our proposed Project Manager and will be assigned for the duration of the project. He is a former Resident Engineer of Caltrans District 7 with more than 27 years of project management, design, and construction experience on transportation infrastructure, water infrastructure, and various other public works projects. He gained his experience working for Caltrans, County Departments of Transportation, Transportation Authorities, and local cities. His project management experience includes contract administration and on-site management involving multiple contractors, and he is highly experienced with the Caltrans Construction Manual and Local Procedures Assistance Manual. He will provide quality control over construction inspection services and will manage the contract and the budget. FCG’s relevant project experience is a demonstration of the different projects we have worked on from bridge widening to Caltrans right-of-way, utility relocation, traffic signals, building and widening ramps, building retaining walls, traffic control, night work, and 55-hour closures. We have completed this work enforcing different specifications, including Caltrans Standard Plans and Specifications, Greenbook Standard Plans and Specifications, SWPPP, Safety, Cal-OSHA, Caltrans Safety Requirements, and Caltrans Structures Safety Requirements.

The following table shows some of the On-Call projects FCG and the Project Manage are managing:

Agency Project
Construction Management and Inspection
City of Irwindale On-Call CM/Inspection Contracts
City of Downey On-Call CM/Inspection Contracts
City of Burbank On-Call CM/Inspection Contracts
City of Bellflower On-Call CM/Inspection Contracts
City of Anaheim On-Call CM/Inspection Contracts
City of Santa Clarita On-Call CM/Inspection Contracts
City of Santa Fe Springs On-Call CM/Inspection Contracts City of Glendale On-Call CM/Inspection Contracts
City of Culver City On-Call CM/Inspection Contracts
City of San Fernando On-Call CM/Inspection Contracts
City of Fontana On-Call CM/Inspection Contracts
City of Diamond Bar On-Call CM/Inspection Contracts
Caltrans Districts 4, 7, 8, 11, 12, and 59 Various On-Call CM/Inspection Contracts – State & Fed. Funds Various Counties: Los Angeles, Orange, & San Diego On-Call CM/Inspection Contracts – State & Fed. Funds Various Ports: SD, LA, & Long Beach 3 On-Call CM/Inspection Contracts – State & Fed. Funds

Page 4 ends

City of Pico Rivera – RFP for
On-Call Construction Management and Construction Inspection Services

QUALIFICATION OF THE FIRM
Organizational Chart
The organizational chart provided below shows our project team and the lines of communication amongst staff members. In addition to the staff shown, the FCG team has a deep bench of resources from which to draw from who are available to provide additional construction management and inspection services should the need for additional resources arise. FCG will not replace staff without prior written consent from the City.

City of Pico Rivera
Kenner Guerrero
Associate Engineer

PM / CM
A.B. Fakhouri, PE FCG
Project Team
Deputy Inspectors
John Haertle, PE Leighton
Roderick Marcia Leighton
Ryan Kash, PE PPI
Eddie Hatami, PE PPI
Michael Emami, PE PPI
Sylva Nwankwo, PE PPI
Hadi Abedi, EIT PPI
Bryan Anderson PMCS
Ramzi Khouli PMCS
Samar Saad, PE Samsa
Jeff Cooper DE
Chi Blakely DE
Jaz Jahazi DE
Robert Fahim DE

Anthony Moussa FCG
Casey Morales FCG
Bill Fernandez FCG
Gary Foster FCG
Don Lewis FCG
Mark Korando FCG
Eric Hildreth DE
Construction
Inspectors
Electrical
Inspectors
Structures /
Building Inspectors
Anthony Moussa FCG
Don Lewis FCG
Mark Korando FCG
Talal Alfakhouri FCG
Casey Morales FCG
Bill Fernandez FCG
Joe Ruzicka FCG
Tyler Haddadin FCG
Mamon Subeh FCG
Moji Shahkarami FCG
Walid Naouchi FCG
David Alcala FCG
Majed Moussa FCG
Shanton Rangi FCG
James Bonelli FCG
David Alcala FCG
Malcolm Weatherbie FCG
Bob Bazargan CEMS
Justin Carr Hill
Eric Hill Hill
Office Engineers/
Labor Compliance
Jasmine Fakhouri FCG
Majed Moussa FCG
Mansi Desai Samsa
The key personnel proposed for this project will be available to the extent proposed for the duration of the required services.

No person designated as “key” will be removed or replaced without the prior written concurrence of the City of Pico Rivera.

Cost Estimators
Hennie Degenaar DE
Emmanuel Lamento DE
SWPPP
Inspectors
Talal Alfakhouri FCG
Bill Fernandez FCG
Tyler Haddadin FCG
James Bonelli FCG
LEGEND
FCG = FCG Consultants, Inc. (Prime)
PPI = Pacific Pros, Inc. (Sub)
Samsa = Samsa Engineering, Inc (Sub)
PMCS = PMCS Group Inc. (Sub)
DE = Destination Enterprise, Inc. (Sub)
CEMS = Const. Eng. Mgmt. Solutions, Inc. (Sub)
Hill = Hill International, Inc.

RMA = RMA Group
Materials Testing
Reymond Roblero RMA
Alexandrea Stigall RMA
Brandon Buffalo RMA
Luis Riley RMA
A.B. Fakhouri, PE FCG
Fabian Aoun, PE FCG
Kal Lambaz FCG
Saeid Asgari, PE CEMS
Bob Bazargan, PE CEMS
Bridget Day, PE Hill DE
Ryan Kash, PE PPI
Ghassan Haidar PMCS
Alex Nunez PMCS
Raymond Delgadillo PMCS
Ali Mazyad, CCM PMCS
Dennis Acker, CCM PMCS
Azzam Saad, PE Samsa
Matthew McMenamin, PE Hill
Samar Saad, PE Samsa
Jeff Cooper DE
Jaz Jahazi DE
Robert Fahim DE
Emmanuel Lamento DE
PM / CM’s

Page 5 ends

City of Pico Rivera – RFP for
On-Call Construction Management and Construction Inspection Services

PROPOSED STAFFING

TEAM RESUMES
A.B. FAKHOURI, PE, QSD / QSP
Construction Manager
Mr. Fakhouri is a Registered Professional Engineer licensed in the State of California, and a former Resident Engineer of Caltrans District 7, Los Angeles, CA. He has worked on various interchange projects of similar nature that included bridge demolition and widening, interchange widening, relocation of utilities, electrical, 55- hour closures, and more. As a Project Manager, duties included, but were not limited to, interfacing with clients, managing and training personnel, managing subconsultants, performing construction management, and construction inspection.

As a Resident Engineer, duties included identifying problems and recommending solutions, ensuring compliance with safety requirements and contract provisions, preparing calculations, reports, and correspondence, reviewing submittals and RFI’s, change orders, conducting meetings, coordination, overseeing inspection, ensuring compliance to safety, SWPPP, and labor laws.

RELEVANT EXPERIENCE
Princeton Avenue Improvements Project, Moorpark, CA
Construction Manager: This Federally Funded project consisted of widening and rehabilitation of Princeton Avenue in the City of Moorpark. Duties included, but not limited to, construction management and inspection of various work items; overseeing field interviews and conducting field reviews of certified payroll; office engineering; conducting meetings; reviewing submittals and Requests for Information (RFIs), Construction Change Orders (CCOs), daily diaries and quantities, and daily photos; coordinating materials testing and lane closures; reviewing contractor as-builts. Cost: $14 Million.

I-15 / Main Street Interchange Improvement Project, City of Lake Elsinore Construction Manager: This Federally Funded project consisted of constructing improvements to Main Street at I-15 from 2 lanes to 4 lanes, ramp metering, improvements to both NB on and off ramps, SB off ramp widening at the intersection and installation of traffic signals. Duties included, but not limited to, construction management and inspection of various work items; overseeing field interviews and conducting field reviews of certified payroll; office engineering; conducting meetings; reviewing submittals and Requests for Information (RFIs), Construction Change Orders (CCOs), daily diaries and quantities, and daily photos; coordinating materials testing and lane closures; reviewing contractor as-builts. Cost: $10 Million.

Spring Street Gap Closure Project, Signal Hill, CA
Construction Manager: This Federally Funded project consisted of enhancing safety along Spring Street from Atlantic Blvd. to Junipero Ave. Duties Included, but not limited to, construction management and inspection of various work items; overseeing field interviews and conducting field reviews of certified payroll; office engineering; conducting meetings; reviewing submittals and Requests for Information (RFIs), Construction Change Orders (CCOs), daily diaries and quantities, and daily photos; coordinating materials testing and lane closures; reviewing contractor as-builts. Cost: $3 Million.

Telegraph Road Traffic Safety Enhancements Project – City of Downey, CA Construction Manager: This Federally Funded project consisted of various improvements on Telegraph Road. Duties included, but not limited to, construction management and inspection of various work items; overseeing field interviews and conducting field reviews of certified payroll; office engineering; conducting meetings; reviewing submittals and Requests for Information (RFIs), Construction Change Orders (CCOs), daily diaries and quantities, and daily photos; coordinating materials testing and lane closures; reviewing contractor as-builts. Cost: $7 Million.

Education
M.S. Civil Engineering, CSULB
B.S. Civil Engineering, CSULB
Licensing
PE License # C60844.

Page 6 ends

City of Pico Rivera – RFP for
On-Call Construction Management and Construction Inspection Services

PROPOSED STAFFING

FABIAN AOUN, PE
Construction Manager
Mr. Aoun has over 8 years of experience in design and construction on a number of projects for local cities and government agencies. Mr. Aoun has worked on a variety of public works projects including, but not limited to, grading, drainage, pavement, concrete, removals, excavation, trenching, storm drains, water/sewer lines, sidewalk, curb and gutter, traffic, and ADA compliance. Mr. Aoun's responsibilities have included construction management, quality assurance, reports and monitoring schedule of work, compliance with plans and specifications and certificates, shop drawings, change orders, submittals and RFI’s, safety compliance, preparation and review of as-built plans, and preparation of final punch list.

RELEVANT EXPERIENCE
Firestone Blvd. Regional Corridor Capacity Enhancements Project, South Gate, CA Construction Manager: This Federally Funded Project consists of implementing roadways, median landscaping, and pedestrian improvements for the Long Beach Boulevard Green Street Project. This project includes pedestrian improvements, median improvements, landscape and irrigation improvements, and pavement rehabilitation. Duties included construction management of various work items; overseeing field interviews; office engineering; conducting meetings; reviewing submittals and Requests for Information (RFIs), Construction Change Orders, and daily photos; coordinating materials testing and lane closures; reviewing contractor as-builts. Cost: $5 Million.

Traffic Signal Improvements Project, Pico Rivera, CA
Construction Manager: This Federally Funded Project consisted of traffic signal modifications and upgrades at 11 intersections, replacement of existing traffic signal equipments, replacements of poles and mast ars, vehicle and pedestrian indications, pushbuttons, conduits, pull boxes, conductors, controller cabinets, battery back-up sustems, LED safety lighting, curb ramps and pavement markings, and signage. Duties included construction management of various work items; overseeing field interviews office engineering; conducting meetings; reviewing submittals and Requests for Information (RFIs), Construction Change Orders, and daily photos; coordinating materials testing and lane closures; reviewing contractor as-builts. Cost: $1.2 Million.

Spring Street Gap Closure Project, Signal Hill, CA
Construction Manager: This Federally Funded Project consisted of enhancing safety along Spring Street from Atlantic Boulevard to Junipero Avenue. This project provides Class 2 bike lanes, countdown ped heads, ADA curb ramps, and sidewalk lights along the corridor to enhance safety for pedestrians and bicyclists. Duties included construction management of various work items; overseeing field interviews; office engineering; conducting meetings; reviewing submittals and Requests for Information (RFIs), Construction Change Orders, and daily photos; coordinating materials testing and lane closures; reviewing contractor as-builts. Cost: $3 Million.

New Park Construction Project (Larkstone Park), Diamond Bar, CA Construction Manager: Project consisted of mass grading, installation of drainage and water treatment facilities, walkways, playground area, benches, landscape, irrigation, parking lots, and restroom structures for a new 3.8-acre park in Diamond Bar, CA. Work included a mill and overlay of access driveways and parking lots, concrete improvements (sidewalk, curb & gutter, curb ramps), electrical, lighting, landscape, irrigation, hardscape, new playground equipment, rubberized surfacing, signage, retaining walls, drainage, and shade structures. Duties included construction management and inspection of various work items; overseeing field interviews and conducting field reviews of certified payroll; office engineering; conducting meetings; reviewing submittals and Requests for Information (RFIs), Construction Change Orders (CCOs), and daily photos; coordinating materials testing and lane closures; reviewing contractor as-builts. Cost: $3 Million.

Education
B.S. Civil Engineering, Cal Poly
University, Pomona
Licensing
PE License # C89086

Page 7 ends

City of Pico Rivera – RFP for
On-Call Construction Management and Construction Inspection Services

PROPOSED STAFFING

MARK KORANDO
Construction Inspector / Electrical Inspector
Mr. Korando has over 29 years of Public Utility (Dry & Wet) and transportation engineering, and inspection expe rience, including construction of Public Utility infrastructure, traffic management , and communication system projects. He has worked in cities throughout Los Angeles, Orange, San Diego, Riverside, San Bernadino, San Francisco, Contra Costa, Alameda, San Mateo Counties and other agencies in southern and northern California. In addition, he has experience with Caltrans Districts 4, 7, 11 & 12 and is familiar with the State of California Standards, Specifications and the latest version of the CA-MUTCD. Duties include utility design engineering, plan checking, construction inspection, obtaining work permits. He is also experieced in MS Office, and AutoCAD.

RELEVANT EXPERIENCE
SR-91 Toll Road: 91 Express Lanes Joint Venture, OCTA/RCTC, CA Construction Inspection: Project consisted of installing traffic signals, Video capture and implementation, major roadway construction, public underground, and overhead facilities. Duties included but not limited to; preparation of daily logs and the inspection of installed elements of the project, including the proper staging of traffic control, work site safety and verification of manpower used on the project. Cost: $8.3 Million.

CIP and Permit for Various Streets improvement Project, City of Santa Monica, CA Construction Inspection: Project consisted of traffic signals and major and minor street improvements, including curb and gutter, medians, Irrigation, sidewalk, and ADA compliant accessible ramps, public underground, and overhead facilities. Duties included but not limited to; preparation of daily logs and the inspection of installed elements of the project including the proper staging of traffic control, work site safety and verification of manpower used on the project. Cost: $7 Million.

Grading and Various Street Construction Project, City of Irvine, CA Construction Inspection: Project consisted of traffic signals and major and minor street improvements, including curb and gutter, medians, Irrigation, sidewalk, and ADA compliant accessible ramps, public underground, and overhead facilities. Duties included but not limited to inspection of roadway excavation and removals, grading and structural section construction, Minor Concrete, Rubberized AC, Traffic Control, ADA Ramps, Sidewalks, Driveways, Drainage, and Safety.

Work also included assisting the Resident Engineer with filing, public relations, produce daily diaries and photos, monitor contractor progress and produce pay estimates, conduct employee interviews, review Change Orders, and correspondences. Cost: $12 Million.

Multiple CIP Street Improvement Project, City of Downey, CA Construction Inspection: Project consisted of several traffic signals and minor street-widening improvements, including curb and gutter, sidewalk, and ADA compliant accessible ramps, public underground, and overhead facilities. Duties included, but were not limited to, field inspection of all work activities; producing daily diaries and quantities; monitoring SWPPP and safety, taking and logging daily photo, interacting with residents and business owners; monitoring progress and relaying information to the City, and attending progress meetings. Cost: $9 Million.

Multiple Street Improvement Project, City of Burbank, CA Construction Inspection: Project consisted of several traffic signals and minor street improvements, including curb and gutter, sidewalk, and ADA compliant accessible ramps, public underground, and overhead facilities. Responsible for the preparation of daily logs and the inspection of installed elements of the project including the proper staging of traffic control, work site safety, reviewed shop drawings and schedules. Cost: $2.5 Million.

Education
Geology, Orange College.

Coastline Community College
Licensing
Certified CADD

Page 8 ends

City of Pico Rivera – RFP for
On-Call Construction Management and Construction Inspection Services

PROPOSED STAFFING

GARY FOSTER
Construction Inspector
Mr. Foster has 18 years of extensive experience in structural, civil, and construction inspection of a variety of public infrastructure projects. Through his working experience, he has developed a working knowledge of the Caltrans project delivery process and Greenbook Standards, Caltrans Special Provision and Standard Plans, Caltrans traffic control, and Stormwater Pollution Prevention Plan (SWPPP). He has also worked on a large variety of public works project including but not limited to: street improvements including widening and reconstruction, HMA and concrete pavement, drainage, utilities, and water/wastewater improvements. He has extensive experience with Minor Concrete, Rubberized AC Paving, Traffic Control, ADA Ramps, Sidewalk Replacement, Driveway Construction, Drainage, Water and Sewer Lines, Electrical, Landscape, and Safety. He has also inspected 40,000 tons of asphalt paving in Caltrans right of way using Caltrans testing methods and procedures of structural concrete and asphalt.

RELEVANT EXPERIENCE
Norwalk Sidewalk Improvements and Alley Way Reconstruction Project, City of Norwalk, CA
Construction Inspector: responsible for on-site inspection in the geographic zone bounded by Excelsior Drive to the north, Pioneer Boulevard to the east, Gridley Road to the west and Alondra Boulevard to the south. Duties included construction inspection, preparing daily diaries with photos, monitoring contractor progress, preparing pay estimate quantities, performing safety inspections and SWPPP inspections, conducting employee interviews, and filing project documents. Cost $1.2 Million.

Arroyo Seco Pedestrian and Bicycle Pathway Project, City of South Pasadena, CA Construction Inspector: The bike and pedestrian path consisted of both concrete and asphalt flatwork and paving and the removal of unsuitable material for off-site haul-off. He provided a review of PCO and CCO for approval by the City Engineer.

Public works inspector at the Arroyos Seco Golf Course for construction of 3,200 linear feet of bike and pedestrian path.

Duties included construction inspection, preparing daily diaries with photos, monitoring contractor progress, preparing pay estimate quantities, performing safety inspections and SWPPP inspections, conducting employee interviews, and filing project documents. Cost: $1 Million.

City of Santa Monica, CBI (Clean Beach Initiative) Santa Monica, CA Construction Inspector: Serve as the onsite inspector for the construction of 1.7-million-gallon revisor water tank, construction of 2 RCP lines. Responsibility included, quantifying the removal of all concrete, and to quantify all concrete placed. Final approval on all concrete finishes. Track all tasks and man hours, write daily reports, review application for payment, review PCO and CCO for approval by the City Engineer. Duties included construction inspection, preparing daily diaries with photos, monitoring contractor progress, preparing pay estimate quantities, performing safety inspections and SWPPP inspections, conducting employee interviews, and filing project documents. Cost: $2 Million.

Sidewalk Improvements Phase 1 &2 City of Southgate, CA.

Construction Inspector: Public works inspector for on-site inspection at various locations throughout the City of Southgate.

He was responsible for overseeing the removal and replacement of damaged sidewalks and public driveways. He provided final approval on all concrete finishes and review of PCO and CCO for approval by City Engineer. Duties included construction inspection, preparing daily diaries with photos, monitoring contractor progress, preparing pay estimate quantities, performing safety inspections and SWPPP inspections, conducting employee interviews, and filing project documents. Cost: $1.85 Million.

Education
AS in CAD / CADD Drafting
Technology / Technician
Licensing
ACI Concrete Field Technician Grade 1
/ Certification # 0093574
USACE / NAVAFAC CQM-C Training /
Certification # 784-KA-CQM-21-0867
C2 CAL Confined Space for
Construction
T-Lock Certification
APNGA Portable Nuclear Gauge Safety
& U.S.D.O.T. Hazmat Certification
OSHA 10-Hour Construction
OSHA HAZWoper 2021 (8-Hour)
Defensive Driving Awareness for
Construction

Page 9 ends

City of Pico Rivera – RFP for
On-Call Construction Management and Construction Inspection Services

PROPOSED STAFFING

MALCOLM WEATHERBIE
Construction Inspector
Malcolm has 14 years of extensive experience in structural, civil, traffic, building and construction inspection of a variety of public works projects.

Through his working experience, he has developed a working knowledge of the Caltrans project delivery process and Greenbook Standards, Caltrans Special Provision and Standard Plans, Caltrans traffic control, and Stormwater Pollution Prevention Plan (SWPPP). He has also worked on a large variety of public works projects including but not limited to street improvements including widening and reconstruction, street extension, storm water drainage, sewers, utilities, and water/wastewater improvements. He has extensive experience with Minor Concrete, Rubberized AC Paving, Traffic Signals, Traffic Control, ADA Ramps, Sidewalk Replacement, Driveway Construction, Drainage, Water and Sewer Lines, Electrical, Landscape, Land Development, Building and Safety a. He has also inspected SCADA projects for Los Angeles County.

RELEVANT EXPERIENCE
San Gabriel River inlet Replacement Structure and Replacement Flow Project, City of Azusa, CA Construction Inspector: This project consisted of diverting water from the river through the Azusa-Duarte Tunnel for conveyance to surface water treatment plants, irrigation fields; reconstruction of the existing inlet structure of the AzusaDuarte Tunnel at the San Gabriel River; and construction of a flow control structure in a ditch at the Azusa water treatment plant site to upgrade these aged facilities and improve system operations and safety. Work included, but not limited to, traffic control, excavation, shoring, waterline construction, drainage, reinforced concrete construction, backfill, mechanical work, electrical work, AC paving, minor concrete and flatwork, SWPPP, and Safety. Duties included construction inspection, preparing daily diaries with photos, monitoring contractor progress, preparing pay quantities, performing safety and SWPPP inspections, and filing project documents. Cost: $8 Million.

Bicknell Park Pump Station Project, City of Montebello, CA Construction Inspector: This project consisted of converting the domestic water to recycled water for a city owned golf course. Work included, but not limited to, traffic control, excavation, shoring, waterline construction, drainage, reinforced concrete construction, backfill, mechanical work, electrical work, AC paving, minor concrete and flatwork, SWPPP, and Safety. Duties included construction inspection, preparing daily diaries with photos, monitoring contractor progress, preparing pay quantities, performing safety and SWPPP inspections, and filing project documents. Cost: $3.7 Million.

State Street Extension Project between 16th Street and Baseline Rd, City of San Bernardino Construction Inspector: This project consisted of construction of a new developed street connecting for a bypass for the 210 freeway to the 215 interstates. Work included, but not limited to, traffic control, grading, excavation, AC paving, minor concrete and flatwork, sidewalk, new domestic water line, traffic signals, and street lighting over DWR 108-inch domestic line diverted underground from the California aqueduct. Duties included construction inspection, preparing daily diaries with photos, monitoring contractor progress, preparing pay quantities, performing safety and SWPPP inspections, and filing project documents. Cost: $7.5 Million.
12” Water Replacement Project City of Commerce, CA.

Construction Inspector: This project consisted of replacing an existing 8’’ domestic water line to a 12’’ water line which included all fire hydrants, air vacs, cad welding, service laterals and cathodic protection. Work included, but not limited to, traffic control, grading, excavation, AC paving, minor concrete and flatwork, sidewalk, new domestic water line, traffic signals, and street lighting over DWR 108-inch domestic line diverted underground from the California aqueduct. Duties included construction inspection, preparing daily diaries with photos, monitoring contractor progress, preparing pay quantities, performing safety and SWPPP inspections, and filing project documents. Cost: $4 Million.

Education
ABC SoCal of Anaheim Trade School
of Inside Wireman
Licensing
1 Hour NPDES certificate 30-Hour
Construction
OSHA 10-Hour
Defensive Driving Awareness for
Construction

Page 10 ends

City of Pico Rivera – RFP for
On-Call Construction Management and Construction Inspection Services

PROPOSED STAFFING

JASMINE FAKHOURI
Office Engineer / Labor Compliance
Ms. Fakhouri has more than 5 years of experience as an Office Engineer on public works projects for public works agencies and construction contractors. Her responsibilities include, but are not limited to, reviewing certified payroll, employee interviews, maintaining accurate and complete project records and files; maintaining contract records; assisting the Project Manager with change orders, submittals, and RFIs; assisting in preparing quantity calculations and cost estimates; coordinating with various agencies; reviewing and preparing correspondence; preparing and updating spreadsheets; converting working files to PDF; and preparing various reports. Ms.

Fakhouri has extensive experience working on federally funded projects that utilize FHWA and Local Assistance Procedures Manual requirements for documentation and filing, verifying certified payroll of contractors, and producing documentation and reports accordingly.

RELEVANT EXPERIENCE
Princeton Avenue Improvements Project, City of Moorpark, CA Office Engineer/Labor Compliance: This Federally Funded project consisted of widening and rehabilitation of Princeton Avenue in the City of Moorpark. Duties included, but were not limited to, preparing, and maintaining project files; performing document control; creating and updating correspondence logs; preparing and updating submittal logs, RFI logs, CCO logs, and materials testing report logs; preparing progress reports; assisting the Resident Engineer with reviewing CCO and pay estimate requests; collecting inspector reports and quantities; and verifying the contractor’s certified payroll. Cost: $ 14 Million. 08/2022 – 04/2024
Telegraph Road Traffic Safety Enhancements Project, City of Downey, CA Office Engineer/Labor Compliance: This Federally Funded project consisted of various improvements on Telegraph Road. Duties included, but were not limited to, preparing, and maintaining project files; performing document control; creating and updating correspondence logs; preparing and updating submittal logs, RFI logs, CCO logs, and materials testing report logs; preparing progress reports; assisting the Resident Engineer with reviewing CCO and pay estimate requests; collecting inspector reports and quantities; and verifying the contractor’s certified payroll. Cost: $ 7 Million. 05/2021 – 02/2022.

Imperial Highway Traffic Signal Upgrades and Safety Enhancement Project, City of Downey, CA Office Engineer/Labor Compliance: This Federally Funded Project consists of construction of a fiber optic traffic signal communication system on Stewart & Gray Road. Duties included, but were not limited to, verifying the contractor’s certified payroll, preparing, and maintaining project files; performing document control; creating and updating correspondence logs; preparing and updating submittal logs; maintaining logs; preparing progress reports; assisting the Resident Engineer with reviewing CCO and pay estimate requests; and collecting inspector reports and quantities. Project Cost: $2.3M | Performance Period: 08/2020 – 11/2021
Stewart & Gray Road Fiber-Optic Traffic Signal Project, City of Downey, CA Office Engineer/Labor Compliance: This Federally Funded Project consists of construction of a fiber optic traffic signal communication system on Stewart & Gray Road; Duties included, but were not limited to, verifying the contractor’s certified payroll, preparing and maintaining project files; performing document control; creating and updating correspondence logs; preparing and updating submittal logs; maintaining logs; preparing progress reports; assisting the Resident Engineer with reviewing CCO and pay estimate requests; and collecting inspector reports and quantities. Project Cost: $2.5M | Performance Period: 08/2020 – 08/2021.

Education
BS Civil Engineering, CSUF
MS Civil / Environmental
Engineering, UCLA-2022
Licensing
EIT In Progress.

Page 11 ends

City of Pico Rivera – RFP for
On-Call Construction Management and Construction Inspection Services

PROPOSED STAFFING

RYAN KASH, PE, SE, CWI, PCI III
Structures Representative
Ryan is a construction and materials expert with extensive Caltrans and city experience. He has hands-on knowledge in various aspects of bridges and buildings including project management, structure construction engineering and inspection, materials engineering and source inspection/testing, structural design, field testing, retrofit, repair, evaluation, and bridge resident engineering. He has performed independent design review for various temporary works systems. Ryan has experience on major bridges in California.

Ryan has extensive experience with pedestrian bridges in construction, design and inspection of existing bridges. Representative projects include the construction of the Mark Bixby Memorial Bicycle-Pedestrian Path (1.5 miles of pedestrian/bike path bridge), inspection of seven bridges at the City of Carpinteria, the retrofit and design of MWD pedestrian/waterline bridge over the Santa Ana River (3 steel stresses) and multiple other pedestrian bridges. He has received numerous awards for his work including Outstanding Engineering Merit Award, Orange County Engineering Council, and the ASCE Friedman Young Engineer of the Year Award. His key project credits include Construction Engineering for Gerald Desmond Bridge Replacement in Long Beach. He enjoys a strong client reference from Caltrans and the agencies that he has worked with.

RELEVANT EXPERIENCE
SR-74 Ortega Highway Retaining Walls, Concrete Barriers, Lake Elsinore, California
Structure Representative. Along a 5.8-mile stretch on Ortega Highway in Riverside County, this project consists of construction of 25 retaining walls (shotcrete) with earth anchors and micropiles, and over 6,000 ft of 842 Concrete Barriers, some on retaining walls (Type A) and some on ground (Type B). The wall surfaces included sculpted and stained surfaces.

The wall length varied from 60’ to 800’ for a total length of 7,270 ft and 2,633 CY. Supervised field engineers/inspectors for various activities and performed inspection/site visits as needed. Reviewed submittals and RFIs including concrete mix designs, repair plans, test results for earth anchor and micropiles. 09/2022 – Present. Cost: $41.8M I-15/SR-91 Express Lane Direct Connector (ELC), EA 08-0F543, Corona, CA Oversight Structure Representative, This project consists of design and construction of ELC 15/91 connector, several retaining walls, sound walls, and slope paving. The project will consist of one Express Lane in each direction facilitating a direct east-to-north and south-to-west connection between the recently opened 91 Express Lanes and the future Express Lanes on I-15. The 15/91 Express Lanes Connector is designed to provide a seamless transition between these Riverside County tolling systems for reliable, convenient travel for residents of Corona, Norco, Jurupa Valley, Eastvale, and points north in San Bernardino County, as well as express buses. RCTC is the AAA Agency, working in partnership with Caltrans. 09/2022 – 01/2023. Construction Cost: $270M.

The Gerald Desmond Bridge Replacement (International Gateway Bridge), CT D7, EA 07-288604 On-Call 59A0761, 59A0939, 59A0894 & 59A1063, Long Beach, CA
Structure Representative/IQA Engineer – Technical Lead. A 1.5-mi long complex bridge (Cable-Stayed Main Span & Segmental Construction in Approaches) consisting of a 6-lane highway bridge with shoulders, and a pedestrian/bike path on the south side of the bridge. CIP CIDH piles were constructed with wet method. Multiple falsework systems were utilized.

Represented Caltrans for inspection activities, temporary structures, safety issues, of contract interpretation. Attended meetings. Constructability review of design submittals; shop drawings, erection manuals, work plans, and quality control plans; review/issuance of NCRs. Reviewed steel structure packages such as built-up steel beams, fabricated steel box girders, field/shop welding, weld/steel NDT, driven steel piles. 07/2015 – 08/2022. Construction Cost: $1.5B.

Education
Ph.D. Structural Engineering,
Southern Methodist
University, TX
M.S. Structural/Earthquake
Engineering, University of
Tehran, 1999
B.S. Civil Engineering, Karaj
Azad University, Tehran,
1997
B.S. Civil Engineering,
CSULB
Licensing
CA, Registered Structural
Engineer #S5473
CA, Registered Professional
Engineer-Civil #C70201

Page 12 ends

City of Pico Rivera – RFP for
On-Call Construction Management and Construction Inspection Services

PROPOSED STAFFING

MICHAEL EMAMI, MS, PE, CWI, QSP/QSD, ICC
Structures Inspector
Michael has 10 years of experience in the disciplines of construction management, civil engineering and inspection, materials testing and evaluation, construction quality verification, inspection of in-service structures, and design. Michael has extensive experience with structure inspection of pedestrian and bikeway bridges including the

1.5-mile-long Gerald Desmond Bridge Replacement Project (International Gateway)/The Mark Bixby Memorial Bicycle-Pedestrian Path and seven (7) bridges at the City of Carpinteria. He has extensive experience with steel structures, elevator construction, concrete structures, pedestrian bridges and temporary works. He is proficient in Caltrans Standard Plans/Specifications and experienced with various codes: ACI, PCI, AWS D1.5, AISC Steel Construction Manual & International Building Code. He has special inspection experience for buildings, and had LEED Green Associate certificate. He is capable to act independently both in the field and in the office.

He has provided project construction support as an oversight structure representative, independent quality assurance engineer, assistant resident engineer, project quality engineer, assistant structural materials representative and project engineer. He is competent in performing engineering analysis, reviewing submittals, performing inspections, and interpreting codes. He has experience working with various national codes as well as Caltrans manuals and documents. He has experience working on airport infrastructure including the LaGuardia Airport in New York, transportation projects such as Gerald Desmond Bridge Replacement Project in the Port of Long Beach (which had 14 structures by itself) and Bon Air bridge in the City of Larkspur, Marin County. He enjoys a strong reference from his clients.

RELEVANT EXPERIENCE
I-10 Corridor Contract 1 (I-10 Express/HOV Lanes Project), EA 08-0C2513 San Bernardino, CA Oversight Structure Representative, The I-10 Corridor Phase 1 Project is located primarily in San Bernardino County with minor improvements in Los Angeles County. This project will widen the existing I-10 freeway between the LA/SB county line and I-15, approximately 10 miles, to include two tolled express lanes in each direction plus auxiliary lanes in selected locations. The project includes construction of 25 bridges including 15 replacements, 8 widening, and 2 overlay.

In addition, 80 different walls comprise of Type 1A Retaining Wall, Soil Nailing, Sub Horizontal Ground Anchors, and Sound Walls. The project reconstructs and modifies existing ramps at 10 interchanges and 7 local arterials. Represented Caltrans Structure Construction Office as Oversight Engineer. Oversaw the performance of Quality Verification (QVE) activities including the review of construction submittals, constructability, RFIs, and NCRs; Verified that all structural quality issues are documented and addressed properly including punch list items; 10/2021 – Present, $685 Million Construction Cost.

Gerald Desmond Bridge Replacement (International Gateway Bridge), Long Beach, CA.

IQA Engineer. A complex bridge (Cable-Stayed Main Span & Segmental Construction in Approaches) consisting of a 6- lane highway bridge with shoulders, a bridge length of 1.5 miles with a pedestrian/bike path on the south side of the bridge.

CIP CIDH pile construction was wet pile using steel casing & oscillators. Multiple falsework systems were utilized. CIDH piles were wet & large diameter. Represented the Caltrans Office of Structure Construction (OSC) and oversaw the DesignBuilder’s QA activities in the field. The elements inspected at the approaches included: CIDH piles (wet hole with a depth ranging from 100’ to 120’, and dry hole for overhead sign structures, 25’ to 30’ deep each), pile caps, columns, 2085 feet of post-tensioned CIP box girders, expansion joints, and bike path elements. The elements inspected at the main span cable-stayed bridge included: erection and bolting of steel members, installation of stay cables, erection of concrete precast panels (598 PC panels), CIP stitches, installation of PTFE bearings and viscous dampers, placement of swivel expansion joints, and post-tensioning of the 2000-ft long main span deck. 12/2014 – 06/2017; 08/2018 –11/2021. $1.5 Billion Construction Cost.

Education
M.S. Degree
Civil/Construction
Engineering Management
University of Southern
California (USC), 2016
B.S. Degree
Civil Engineering
Univ. of California Irvine
(UCI), Irvine, CA, 2013
Licensing
CA, Registered Professional
Engineer-Civil #88306
QSD/P, Qualified Storm
Water Pollution Prevention
Plan Developer/ Practitioner,
#27951

Page 13 ends

City of Pico Rivera – RFP for
On-Call Construction Management and Construction Inspection Services

PROPOSED STAFFING

GHASSAN HAIDAR, PE
Construction Manager
Introduction/Overview. Mr. Ghassan Haidar has over 30 years of experience in construction management, project management, design, and construction inspection. His experience comes from the engineering and construction of civil structure projects that include water, recycled water, sewer pipelines, streets resurfacing, water storage tanks, parking structures, pumping stations, and wastewater treatment facilities. He is knowledgeable in LABC, UBC, ACI and AISC codes, and has strong experience in enforcing Grading, Earthquake and Handicapped requirements, experience that he gained from working at the Department of Building and Safety. Mr. Haidar has exemplary leadership and communication skills and works efficiently in demanding, fast-paced environments.

RELEVANT EXPERIENCE
LACDPW Marina Del Rey Back Basins Project – Los Angeles, CA:

Construction Manager, Mr. Haidar’s duties include to Manage all aspects of projects from design through construction and closeout. Develop and control project scope. Develop and maintain project budgets. Develop and review project schedules. Facilitate project team and client meetings. Monitor and coordinate construction activities with the various project stakeholders, prepare reports. Determine merit of change proposals, negotiate, and prepare change orders. Anticipate and resolve project issues and challenges. 2021-Ongoing, Project Cost: $10 Million LACDPW Monteith Park and View Park Stormwater Improvements – Los Angeles, CA:

Construction Manager, Mr. Haidar’s duties include to Manage all aspects of projects from design through construction and closeout. Develop and control project scope. Develop and maintain project budgets. Develop and review project schedules. Facilitate project team and client meetings. Monitor and coordinate construction activities with the various project stakeholders, prepare reports. Determine merit of change proposals, negotiate, and prepare change orders. Anticipate and resolve project issues and challenges. 2021-Ongoing, Project Cost: $10 Million Various K-12 Modernization Projects, LAUAD, CA:

Construction Manager, Managed, oversaw, and coordinated all facets of the pre-construction, bid and award, construction, and close-out phase of all assigned projects. Administered provisions of Professional Service Agreements between architects and the District. Monitored and managed project close-out with respect to project certification with the Division of State Architect (DSA) and project financial close-out. 2018-2020, Project Cost: 3.2 Million LACDPW Various Wastewater Treatment Plants, Los Angeles, CA:

Construction Manager, Managed the construction and design of multiple wastewater treatment plant projects. Interfaced with the General Contractors, Contract Administration, DB&S, DWP, DDW, AQMD, Port of LA and oversaw design consultants to ensure work in progress was completed within budget and on-schedule. Decision-maker on engineering issues and issued field instructions to the contractors. Managed changes in work due to unforeseen conditions and scope or design revisions. Reviewed plans for constructability, including reviewing Environmental Impact Reports (EIRs) related documents, Statement of Completion, and as-built drawings. Managed and effectively prioritized multiple projects at any given time. Design - Build projects: Managed the design and construction of seven CIP projects at Terminal Island, and rehabilitation of four pumping plants in San Pedro, valued over $112 million that included the construction of the Advanced Water Purification Facility (AWPF), which will increase the Terminal Island’s Water Reclamation Plant’s treatment capacity from 6 - 12 MGD; included additional microfiltration, reverse osmosis, and advanced oxidation process system.2014-2018.

Project Cost: Various.

Education
BS, Civil Engineering - CSULB
Licensing
CA PE, No. C55608, expires
12/31/25

Page 14 ends

City of Pico River – RFP for
On-Call Construction Management and Construction Inspection Services

SUBCONSULTANTS

BRIEF BIO OF OUR SUBCONSULTANTS
Hill International, Inc., Construction Management / Construction Inspection Contact: Juan Pablo (J.P.) Villamizar, Senior Vice President, (949) 748-5485, [email protected] Address: 12130 Santa Margarita Court, Rancho Cucamonga, CA 91730 Hill International, Inc. (Hill) is an international construction consulting firm that provides program and project management, construction management, cost engineering and estimating, quality assurance, inspection, scheduling, risk management, and claims avoidance to clients involved in major construction projects worldwide. Hill has participated in over 90,000 project assignments, with a total construction value of more than $1 trillion. Hill is the 4th largest project and construction management firm in the U.S., as featured in Building Design + Construction magazine.

We are also ranked the 8th largest overall U.S. construction management firm by Engineering News-Record magazine. Our staff includes professionals in all construction and building-related disciplines, including planners, schedulers, estimators, value engineering specialists, construction managers, resident engineers, construction inspectors, and a full range of technical and support staff to represent owners. Our depth of expertise means we will always be able to support your project, regardless of manpower needs. DIR Registration # 1000019597 PMCS Group, Inc., Construction Management / Construction Inspection Contact: Lauren Weiss, Business Development Director, (661) 310-6104, [email protected] Address: 2600 E. Pacific Coast Highway, Suite 160, Long Beach, CA 90804 PMCS Group, Inc. (PMCS), a Long Beach based SBE firm, brings over 18 years of providing successful project and construction management support to Southern California cities, counties, and other public entities. Our team of over 120 professionals have delivered numerous similar projects in the Orange County, Los Angeles, and surrounding areas, including street widening, repaving, and resurfacing; traffic signal improvements; parks; pump stations; water resources; facilities (fire stations, police stations, educational buildings); sports fields and playgrounds; and additional infrastructure projects. In addition to PM/CM services, our team provides project engineering, scheduling, estimating, document control, constructability and biddability review, design management, inspection, surveying, and safety compliance.

Throughout our project experience, PMCS and our proposed team members have overseen projects with local, state, and federal funding, ensuring our team can deliver any capital improvement projects for the City on schedule, on budget, safely, and to the quality standards set by the City. DIR Registration # 1000017900 Pacific Pros, Inc., Construction Management / Structures Contact: Ryan Kash, Principal, (949) 535-0533, [email protected] Address: 18 Crestview, Also Viejo, CA 92656
Pacific Pros is a firm specializing in bridge construction, especially steel bridges with extensive experience in inspection of pedestrian bridges/bike path, all structural elements, elevators, architectural features, accessibility, and design of pedestrian bridges. Pacific Pros’ Headquarters is in Aliso Viejo with a strong local presence. Pacific Pros has extensive experience on major California bridge projects with key project credit of the International Gateway Bridge, aka, the Gerald Desmond Replacement Bridge. Pacific Pros has extensive Caltrans experience. Pacific Pros provide construction managers, specialty inspectors and seasoned inspectors that can support any project in the City. DIR Registration # 1000059027

Page 15 ends
← All documents from this meeting