Cities Index.
Agenda packet

Pico Rivera City Council
March 26, 2024

Document
Agenda packet
Meeting
March 26, 2024
Body
Pico Rivera City Council
Pages
38
Original file
85.5 MB
Text extracted from the city's file for reading and search. Open the original on picoriveraspeaks.org. That file is the official record.

City of Irvine – RFP No. 24-3394, 2024 On-Call
PM-1 Project Management & Construction Management Services

SUBCONSULTANTS
CEM, Inc., Claims Management / Scheduling
Contact: Saeid Asgari, PE, Project Manager, (949) 379-4481, [email protected] Address: 14252 Culver Drove, Irvine, CA 92604
CEMS is a certified SBE providing vital Construction Management Support on various projects with various agencies such as OCTA, LA Metro, Caltrans, and Contractors providing support services that includes Program/ Project/ Construction Management, Construction Quality Validation Management, Claims Support Services, Claims Avoidance, Claims Resolution, and CPM Scheduling Review and Analysis. CEMS, Inc. will bring to Our clients the Lesson Learned Experience we have gained by providing comprehensive inspection/ Construction Management services within the Southern California region for over 30 years. Our team has significant experience on local freeway widenings and Bridge structure projects. DIR Registration # 1000046494 Samsa Engineering, Inc., Construction Management / Construction Inspection Contact: Samar Saad, PE, Principal, (714) 475-4706, [email protected] Address: 17011 Beach Blvd., Suite 900, Huntington Beach CA 92708 Samsa Engineering (Samsa) is a corporation founded in 2023 as a DBE/SBE/WBE firm. Samsa provides construction/project management, construction inspection, office engineering, and claims expertise for projects involving streets, bridges, bike trails, and drainage improvements. The Samsa Engineering team brings a wealth of diverse experience to successfully deliver public infrastructure projects. Our team members have cultivated expertise from both the contractor and owner representative perspectives, offering a well-rounded understanding of the intricacies involved in each individual project from inception to close-out. DIR Registration # PW-LR-1001044844; DBE 51588 Destination Enterprises, Inc., Construction Management / Construction Inspection Contact: Marcy Szarama, Principal, (310) 439-2655, [email protected] Address: 11940 Hammack Street, Culver City, CA 90230
Destiantion Enterprises, Inc. (DE) a corporation founded in 2005 as a WBE, SB, and LGBTBE firm. DE provides project management, construction management, inspection services, scheduling, estimating, constructability reviews, utility coordination, document control, labor compliance, and claims management. Our CM experience includes providing construction managers, Resident Engineers, Office Engineers, safety managers, and inspectors to support owners in the oversight of general contractors and subcontractors, providing superior specialized expertise in the field to ensure that projects are safely constructed to meet the plans, specifications, and requisite quality.

DIR Registration # 1000035864; WBE 13090030
RMA Group, Inc., Construction Management / Construction Inspection Contact: Tim Saenz, Business Development / Project Coordinator, (909) 989-1751, [email protected]
Address: 12130 Santa Margarita Court, Rancho Cucamonga, CA 91730 RMA Group (RMA), established in 1962, is a California corporation with professional offices and laboratory facilities strategically located throughout California. RMA Group’s geotechnical and geologic design services include preliminary geotechnical investigations, foundation studies, fault investigations, liquefaction analysis, Phase 1 environmental site assessments, and geotechnical and geologic review of grading and foundation plans. Their inspectors and technicians are highly qualified to perform all aspects of construction inspection and materials testing.

They are experienced, cross-trained, and hold multiple certifications including ICC, ACI, AWS, ASNT, OSHPD, DSA, NICET, and more than 500 individual Caltrans certifications, which allows them to inspect diverse elements of construction projects simultaneously. DIR Registration # 100006493

Page 16 ends

WORK APPROACH
City of Irvine – RFP No. 24-3394, 2024 On-Call
PM-1 Project Management & Construction Management Services

METHODOLOGY & WORK PLAN

SCOPE OF WORK
FCG proposes to provide the City with staff augmentation services for Construction Management and Inspection Services.

Understanding of Need
FCG will provide the City of Pico Rivera with as-needed Construction Management and Inspection Services for capital improvement projects at the City’s request. FCG provides services including roadways, structures, utilities, street lighting, traffic signals, Irrigation and landscaping, and various other public works developments. We are ready to assist the City with constructability reviews, contract administration, construction management, cost estimating, inspection, collaboration with stakeholders to solve problems, maintaining records, and reporting, as well as document control, claims mitigation, utility coordination, and project acceptance. FCG has extensive public works experience, civil engineering construction expertise, depth of resources, and knowledge of local and regulatory issues. Projects may be funded through various state, local, and federal funds and it is important for the consultant team to have knowledge of City/County Standards, Greenbook Caltrans design procedures, Caltrans Local Assistance Procedures Manual (LAMP), Caltrans Local Assistance Program Guidelines (LAPG), Caltrans Standard Plans and Specifications, and state regulatory requirements.

Specific services FCG offers the City to assist in managing its capital improvement program include but not limited to:

Project Management
Our goal as the Project Management and Construction Management consultant is to successfully deliver projects on time, within budget, and according to plans and specifications. The tables below briefly list the construction management services provided by The FCG Team:

Project Management Services
Provide support to the Director or Designee to administer the CWA; assist with interpretations and notices Work with City staff to discuss, develop solutions and resolve issues of concern Facilitate the orderly settlement of labor disputes and grievances without strikes or lockouts Monitor relations between unions and contractors; maintain grievance documentation Monitor contractors’ compliance with worker utilization goals and work with contractors to meet or exceed goals; work with local organizations to support worker utilization goals
Collect, analyze, and maintain files related to the CWA, including, but not limited to, Letters of Assent, evidence of core worker qualifications, veteran status, and workforce compliance
Provide CWA status update reports for each project, as directed by City staff The Consultant shall also monitor and enforce labor compliance requirements, unless otherwise directed by the City, including, but not limited to:

Development of labor compliance administration structure and program implementation Monitor and enforce compliance with the California Labor Code, the California Code of Regulations, and if applicable, the Davis-Bacon and Related Acts
Visit project construction sites to conduct labor compliance interviews, and if federal, Equal Employment Opportunity (EEO) interviews and observations
Work with contractors and subcontractors who are delinquent with prevailing wage requirements toward prompt resolution Process, investigate, resolve, and recommend referral to the State Labor Commissioner when wage violations occur; recommend withhold of contractor payments as necessary

Page 17 ends

City of Pico Rivera – RFP for
Construction Management and Construction Inspection Services

WORK APPROACH
Designed Support
Design Support
FCG offers Specifications Development and review and can generate project specific special provisions (Green Book – 2021 or older).

FCG Offers Peer Design review.

FCG will conduct complete constructability and buildability reviews of proposed projects to conform with the PCC, Standard Specifications, and Design Standards. Information will be inputted on a spreadsheet for easy follow up.

Construction Management
Construction Management Services
Conduct a pre-construction meeting and bi-weekly construction meetings with the contractor, the City, and all other involved parties. Prepare and distribute meeting agendas and minutes.

Manage and coordinate all aspects of the project including coordinating with City staff, multiple contractors, agencies, and project stakeholders.

Prepare Weekly Status Reports and Statements of Working Days.

Coordinate design changes with the Engineer of Record.

Participate in field meetings and document issues, findings, directions, changes, etc., and develop solutions.

Prepare, monitor, and update the construction schedule.

Prepare change orders in the City’s standard format.

Maintain a record of accounting costs including approved change orders.

Review payment requests, make payment recommendations, and prepare progress payments in the City’s standard format.

Review and coordinate the approval of shop drawings with the design consultant.

Review and approve materials submittals.

Log, track, and process submittals, Requests for Information (RFIs), Requests for Changes (RFCs), Contract Change Orders (CCOs), field directives, Notices of Potential Claims (NOPCs), Non-Conformance Reports (NCRs), construction schedules, and detailed traffic control plans.

Provide the City with As-Built and electronic sets of drawings at project completion.

Monitor materials documentation and testing results as well as enforce corrections.

Conduct labor compliance per LAMP requirements. Maintain project files per LAMP guidelines.

Review and approve the contractor’s safety program and traffic control plan.

Review and respond to all RFCs.

Process all project documentation per City and Caltrans guidelines.

Perform a constructability review of the 100% plans, specifications, and estimates.

Prepare cost estimates.

Verify contractor conformance with the City’s Community Workforce Agreement (CWA).

Maintenance and Facilities Construction Support
FCG staff have managed Maintenance and Facilities for municipalities and will perform the following:

Assessment
FCG will assess the current concrete condition (damaged, cracked, displaced, and ADA) of the entire length of proposed project and other miscellaneous areas concrete facilities (sidewalks, curbs and gutters, ramps, driveway approaches, spandrels, and cross gutters, etc.) and other areas as assigned. This assessment will include determining if the sidewalks and other facilities need replacement, grinding, temporary ramps, etc. for the consultant to generate lists of actions needed. The process and techniques used to evaluate the concrete facilities will be explained in a report.

FCG will input information that includes location, measurements, etc. on a spreadsheet.

FCG will generate a google map that lists the addresses of locations identified, list of items for bidding purposes.

Page 18 ends

WORK APPROACH
City of Pico Rivera – RFP for
Construction Management and Construction Inspection Services Utility & Agency Coordination
The FCG team is highly experienced in coordinating with utility companies and third parties to achieve successful project completion. Third-party coordination services include the following tasks:

Utility & Outside Agency Coordination Services
Send notification of the pre-construction meeting to all affected utility companies, the Sheriff’s Department, the Orange County Fire Department, and other project stakeholders prior to construction.

Review project scope of work with each utility company at the construction conference and review possible conflicts. Work with each utility to ensure that specific needs of the project are understood.

Labor Compliance
The FCG team is highly experienced enforcing labor compliance in accordance with State and Federal requirements, specifically LAMP and Community Block Development Grant (CBDC) program requirements:

Labor Compliance Services
Verify eligibility of selected contractor and its subcontractors to receive contract awards by confirming current, active license status with Contractors State License Board; current, valid contractor’s bond and workers’ compensation coverage; LAPM submittal requirements; nonappearance on Federal List of Parties Excluded and State Division of Labor Standards Enforcement lists.

Attend preconstruction meeting to present federal labor compliance requirements to contractor and subcontractors; prepare minutes and attendance record.

Verify and document jobsite posting of wage rate information and required labor compliance posters. Conduct site visits to monitor workforce utilization; perform labor compliance interviewing of employees on site, using appropriate forms, in the proper frequency and of the proper work classifications required by governmental authorities.

Receive and review labor compliance documentation from public works observers or inspectors and compare with contractor-submitted documents and interviews and information obtained from site visits. Monitor contractor payroll documentation of certified payroll reports, fringe benefit statements, apprenticeship documentation, and payroll deduction authorizations.

Review and verify the contractor’s skilled and trained workforce certification and monthly skilled and trained workforce reports.

Follow up with contractor by telephone, email, and/or certified mail regarding required document submittals and payroll discrepancies. Provide detailed description of deficiencies; outline corrective actions; and enforce deadlines for compliance.

Receive, pursue, and document labor complaints and/or violations; prepare violation reports to oversight entities as required; recommend special action to be taken if contractor continuously fails to comply with requests and requirements.

Coordinate with City staff the withholding of progress payments if contractor fails to abide by labor compliance requirements.

Maintain content and format of federal labor compliance file in conformance with applicable government requirements.

Coordinate project file reviews by authorized county, state, and federal agencies.

Submit complete federal labor compliance file to City for retention.

Project Close-Out
The FCG team will assist the City with all aspects of project close-out, including, but not limited to, the following tasks:

Project Close-Out Services
Coordinate a final walk-through with all affected stakeholders, prepare the punch list, certify completion of the project, and recommend acceptance.

Transmit the contractor’s approved Record Drawings (As-Builts) to the City. Provide an electronic version of all drawings. Provide paper and electronic files of all construction documents in the City’s approved format.

Finalize record drawings, contract bid items, claims, change orders, and punch list items.

Prepare all final reports, including report of completion for acceptance of the project.

Finalize and deliver all construction files to the City for archives.

Address any unresolved issues including, but not limited to, change orders, claims, etc.

Complete documentation required by LAPM.

Page 19 ends

WORK APPROACH
City of Pico Rivera – RFP for
Construction Management and Construction Inspection Services

METHODOLOGY
1) Constructability/Biddability Reviews - The FCG Team will review the plans and special provisions during design for errors and constructability and biddability issues, report those findings to City of Pico Rivera, and will coordinate with the design team to eliminate such issues. By being active during design, these findings typically provide for accurate and concise bids that eventually reduce RFI’s, changes or claims during construction. Most importantly, bid items in the Special Provisions must be clear as they describe the work, measurement of the work, and what is included in the payment of each item.
2) Value Engineering (VE) - The FCG Team will conduct value engineering as requested by the city. We will follow the FHWA VE process during the concept and design phases, by using a multidiscipline team of engineers not involved in the project, that will provide recommendations for:
 the needed functions safely, reliably, efficiently, and at the lowest overall cost.  improving the value and quality of the project.
 reducing the time to complete the project.
3) Public Bidding Phase Support - The FCG Team will assist the City of Pico Rivera in the construction bid procurements, including contract documents, Federal and State requirements, Plans and Special Provisions, and permit requirements. We will perform all work per the City and Caltrans Construction Manual and Local Assistance Procedure Manual.
4) Submittal Tracking and Reviews - The FCG Team will provide the contractor with a list of submittals as per the Special Provisions, then perform a thorough, comprehensive review of the contractor’s submittals. We will work closely with City of Pico Rivera to determine which submittals the design consultant will review, and which will be reviewed by the FCG Team. A Submittal log will be developed, maintained, and tracked according to when they are received and returned to the contractor and a copy will be included with each transmittal and at the weekly meetings.

Materials releases and certificates of compliance will be kept in the appropriate filing categories, and materials summary sheets will have a running total of materials used on the Project. Anticipated submittals include, but are not limited to, baseline schedule, bi-weekly lookahead schedules, shoring plans, falsework plans, demolition plan, bridge materials, concrete mix designs, HMA job mix, shop drawings, quality control plans, traffic handling plans, piling plans, health and safety plan, lead compliance plan, and temporary lighting plan. 5) Construction Staking – Under the direction of the Resident Engineer and FCG inspector will coordinate with the Contractor for verification of Contractor’s staking, layouts, controls, spot check reference points, and finished work.

The Surveyor will acquire the horizontal control and record maps from the City and identify existing survey monuments/right-of-way.
 The FCG Team will verify contractor’s surveyor staking and layout to ensure compliance with State’s requirements in terms of preservation and/or re-establishment of survey monuments, including recordation requirements.  The FCG Team will verify contractor’s surveyor work to ensure compliance with all required construction survey requirements including, but not limited to, setting lines and grades, construction staking, and preparation of cut sheets.  The FCG Team will prepare and file any documentation required for recordation with the LA County Recorder’s Office.  The FCG Team will perform any other survey activities as deemed necessary by the City to ensure construction of the Project is following the PS&E.
6) Construction Management & Controls - Our goal as the construction management consultant is to successfully deliver projects on time, within budget, and according to plans and specifications. The FCG Team will provide the following services:
 Conduct a pre-construction meeting and bi-weekly construction meetings with the contractor, the City, and all other involved parties.

Prepare and distribute meeting agendas and minutes.
 Manage and coordinate all aspects of the project including coordinating with City staff, multiple contractors, agencies, and project stakeholders.

Cost Control Schedule
Control
Quality
Control
Document
Control
Change
Management
Risk
Management

Page 20 ends

WORK APPROACH
City of Pico Rivera – RFP for
Construction Management and Construction Inspection Services  Prepare Weekly Status Reports and Statements of Working Days.  Coordinate design changes with the Engineer of Record.  Participate in field meetings and document issues, findings, directions, changes, etc., and develop solutions.  Prepare, monitor, and update the construction schedule.  Work with the City of Pico Rivera during the construction Contract Award and Change Order process to assist City of Pico Rivera in controlling the costs of the Project and controlling the factors that may escalate Project costs. The FCG Team will receive, process, track, and document Project requests for Contract Change Orders from the Contractor and a CCO log will be established at the beginning of the Project and will be continuously maintained and updated by the RE. To the delegated level of approval, and under the City of Pico Rivera’s direction, the FCG Team will determine the need, merit, scope, estimated cost, and schedule impacts to the project because of potential contract change orders. The FCG Team will also negotiate change orders with Contractor as directed. Once merit is established, The RE will prepare change orders based on the Contract Documents and in close coordination with the Design Engineer and City Project Manager.
 FCG’s CM will manage the Project’s budget and will set up an internet-based document controls system. The team will prepare independent monthly estimates for the Project duration, review payment requests, make payment recommendations, and prepare progress payments in the City’s standard format monitoring both the Project and contingency budgets. Our report to City of Pico Rivera will include amount paid to contractor to date, previously paid amount to contractor, percent complete of each bid item, executed change orders, and retention withheld from each pay estimate. Our intent is to keep the City of Pico Rivera fully informed of the financial status of the project.  Provide the contractor with a list of submittals as per the Special Provisions, then perform a thorough, comprehensive review of the contractor’s submittals. We will work closely with City of Pico Rivera to determine which submittals the design consultant will review, and which will be reviewed by the FCG Team. A Submittal log will be developed, maintained, and tracked according to when they are received and returned to the contractor and a copy will be included with each transmittal and at the weekly meetings. Materials releases and certificates of compliance will be kept in the appropriate filing categories, and materials summary sheets will have a running total of materials used on the Project. Anticipated submittals include, but are not limited to, baseline schedule, bi-weekly lookahead schedules, shoring plans, falsework plans, demolition plan, bridge materials, concrete mix designs, HMA job mix, shop drawings, quality control plans, traffic handling plans, piling plans, health and safety plan, lead compliance plan, and temporary lighting plan.
 Provide construction staking.
 Log, track, and process submittals, Requests for Information (RFIs), Requests for Changes (RFCs), Contract Change Orders (CCOs), field directives, Notices of Potential Claims (NOPCs), Non-Conformance Reports (NCRs), construction schedules, and detailed traffic control plans.  Provide the City with As Built and electronic sets of drawings at project completion.  Monitor materials documentation and testing results as well as enforce corrections.  The FCG Team will conduct labor compliance per LAMP requirements. Maintain project files per LAMP guidelines.  Review and approve the contractor’s safety program and traffic control plan.  Review and respond to all RFCs.
 Process all project documentation per City and Caltrans guidelines.  Provide community public relations and outreach services. 7) Contract Administration – The FCG’s CM/RE and Office Engineer will establish and maintain a filing system in hard copy as well as electronically, using the Caltrans Construction Manual as a guideline to ensure compliance with Federal funding requirements. FCG typically utilizes the Caltrans filing system on projects. Additionally, FCG’s Office Engineer will upload the electronic data documentation to the City. All hard copy files will be scanned as PDF files and stored digitally on a server with a filing structure duplicating the hard copies and will provide regular reports as required by the funding agreements.
8) Inter-agency and Third-Party Utility Coordination - The FCG’s Team will manage the Project’s utility coordination efforts with the contractor and the local utility companies. A critical factor for constructing any project is early

Page 21 ends

WORK APPROACH
City of Pico Rivera – RFP for
Construction Management and Construction Inspection Services partnering with utility companies within the project limits. Our CM and the FCG Team will coordinate with each utility company and work diligently to communicate, schedule, and achieve the timeline for each relocation or new construction. For utilities planned for relocation during construction, the FCG Team will initiate coordination with the contractor and the respective utility to plan for USA Dig Alert, potholing, and scheduling of the relocation work of the facilities. The CM will verify the Contractor incorporates work related to the utilities in the baseline schedule. The FCG team is currently providing these same types of services to Cities of Irwindale, Downey, Burbank, and other municipalities and agencies throughout the state. The FCG Team utilizes a system for tracking building and public works permits using a spreadsheet. This system is simple and allows the permittee and City officials to view the current budget and status of each permit. The FCG Team will keep every agency involved should any changes or modifications are needed. The FCG Team will ensure that the baseline schedule submitted by the contractor includes the permits requirements.
9) Construction Inspection - FCG will provide the City with a team of qualified construction inspectors experienced in street, bridge, water, sewer, storm drain, safety lighting, utility relocation, street rehabilitation, pavement preservation, traffic signals, constructing and widening ramps, signing and striping, retaining walls, parks and trails, irrigation & landscaping, traffic control, drainage systems, and asset assessment and reports. We have completed this work enforcing different specifications, including Caltrans Standard Plans and Specifications, Greenbook Standard Plans and Specifications, SWPPP, Safety, Cal-OSHA, Caltrans Safety Requirements, and City of Pico Rivera Safety Requirements. The construction inspection services FCG provides are listed below.  Ensure project construction in accordance with approved plans, specifications, and estimates; City standards; Standard Plans and Specifications for Public Works Construction; and Caltrans Standard Plans and Specifications.  Coordinate with City staff, including emergency responders and utility companies, and other project stakeholders.  Coordinate construction activities inclusive of temporary parking restrictions, temporary traffic control, etc.  Complete daily measurements of quantities of work with the contractor and daily inspector reports. Provide complete and documented measurements and calculations to administer progress payments, change orders, extra work, etc.  Provide daily reports to City staff on a weekly basis.  Attending all project meetings such as pre-construction, field, and progress meetings.  Prepare in-progress punch lists at the completion of each phase of the project.  Ensure all construction activities are witnessed. If deemed necessary, inspection for night work shall be performed.  Ensure compliance with the NPDES program, and the Construction Site Best Management Practices (BMP) Manual.  Inspect materials and equipment upon delivery for compliance with construction contract documentation.  Each working day, meet with the Contractor to review proposed work plans, including specific details that may affect progress. Inform City’s Project Manager of any work which may result in a noteworthy impact to the City.  Document field changes and maintain red-line as-built set of construction drawings.  Closely monitor compaction, material, and other necessary testing results and require the Contractor to provide corrective measures to achieve compliance.
 Maintain copies of all permits needed to construct the project and enforce special requirements of each. 10) Labor Compliance – The FCG team is highly experienced in enforcing labor compliance in accordance with State and Federal requirements, specifically LAMP and Community Block Development Grant (CBDC) program requirements. The FCG Team will:
 Verify eligibility of selected contractor and its subcontractors to receive contract awards by confirming current, active license status with Contractors State License Board; current, valid contractor’s bond and workers’ compensation coverage; LAPM submittal requirements; non-appearance on Federal List of Parties Excluded and State Division of Labor Standards Enforcement lists.
 Attend preconstruction meeting to present federal labor compliance requirements to contractor and subcontractors; prepare minutes and attendance record.
 Verify and document jobsite posting of wage rate information and required labor compliance posters. Conduct site visits to monitor workforce utilization; perform labor compliance interviewing of employees on site, using appropriate

Page 22 ends

WORK APPROACH
City of Pico Rivera – RFP for
Construction Management and Construction Inspection Services forms, in the proper frequency and of the proper work classifications required by governmental authorities.  Receive and review labor compliance documentation from public works observers or inspectors and compare with contractor-submitted documents and interviews and information obtained from site visits. Monitor contractor payroll documentation of certified payroll reports, fringe benefit statements, apprenticeship documentation, and payroll deduction authorizations.
 Review and verify the contractor’s skilled and trained workforce certification and monthly skilled and trained reports.  Follow up with contractor by telephone, email, and/or certified mail regarding required document submittals and payroll discrepancies. Provide detailed description of deficiencies; outline corrective actions; and enforce compliance.  Receive, pursue, and document labor complaints and/or violations; prepare violation reports to oversight entities as required; recommend special action to be taken if contractor continuously fails to comply with requirements.  Coordinate with City staff the withholding of payments if contractor fails to abide by labor compliance requirements.  Maintain content and format of federal labor compliance file in conformance with applicable government requirements.  Coordinate project file reviews by authorized county, state, and federal agencies.  Submit complete federal labor compliance file to City for retention. 11) Storm Water Quality Inspections – The FCG team includes members certified as Qualified Stormwater Developers (QSD) with applicable certifications. We will review the contractor’s SWPPP to ensure compliance with the Regional Water Quality Control Board (RWQCB) permit requirements. We will conduct regular inspections of the site with the contractor and upload reports and documents to the SMARTS database. Our team will ensure the contractor adheres to the approved SWPPP plan and installs and maintains appropriate BMPs. FCG inspectors understand the importance of managing the SWPPP. All FCG inspection staff have completed their Qualified SWPPP Practitioner (QSP) and/or Qualified SWPPP Developer (QSD) training and are QSP/D certified. The inspectors are trained in the preparation of SWPPP diaries including the on-line reporting, review of Best Management Practices (BMP’s), and erosion control measures both during the rainy season and throughout the year. They will immediately notify the Resident Engineer of any problems during the implementation of the SWPPP. Proper implementation is especially important on all inlets and discharge points.
12) Multi-Trades Materials Testing (asphalt, concrete, masonry, steel) – Material testing shall conform to all Caltrans Standards and the LAPM The services include but are not limited to:
 Review and approve AC mix designs.
 Review and approve PCC mix designs. Consult with City for approval of PCC mix for the Project.  Provide all material source inspection, sampling and testing by a qualified materials engineer as required.  Provide requested miscellaneous consultation during the Project, including discussion with the contractor to emphasize proper treatment of concrete. Provide all compaction tests per plan, specifications, and regulations per LAPM and contract documents. Provide nuclear compaction testing and provide geotechnical soil testing.  Provide coordination for traffic controller testing and other traffic signal equipment as needed. 13) Progress Meetings and Reporting - The Resident Engineer will conduct weekly progress and field meetings with the contractor, City of Pico Rivera, as necessary and appropriate, and the inspectors, Office Engineer, and other subconsultants will attend and participate in the discussions and documentation of the meetings. Our RE will prepare the meeting agendas, which will include reviews of the Project schedules, a summary of submittals and RFI’s, unresolved issues, and new issues requiring follow-up. Our RE will produce meeting minutes for each meeting. In addition, The FCG Team will coordinate and meet with residents, business owners, utility firms, and other agencies involved with this project as needed. The RE will discuss issues with the Inspectors, and Office Engineer to ensure previous meeting minutes have been documented and distributed.  Public Community Relations/Outreach - The FCG Team believes that public outreach is essential to the success of any project that will have an impact on motorists, residents, businesses, and schools.  Traffic Control – If the Contractor is required by contract to submit a Traffic Control Plan (TCP). Coordination between the TCP and the construction staging proposed by the contractor is imperative. There are some issues to be considered and resolved during construction and the FCG Team will look forward to assisting with constructible

Page 23 ends

WORK APPROACH
City of Pico Rivera – RFP for
Construction Management and Construction Inspection Services solutions that will help avoid any extra cost or inefficiency claims. Per specifications, the job site shall be maintained in a neat and orderly condition and safe pedestrian pathways always provided along all sidewalks, without exception.

The FCG Team will coordinate all efforts with the City and the Contractor to ensure full compliance with the requirements of MUTCD, WATCH Manual, and project specifications.  The FCG team will coordinate with schools to incorporate their schedule and activities as part of the TCP.  The FCG Team will coordinate with the Contractor and residents and businesses regularly through flyers, weekly and monthly meetings as needed to mitigate concerns, traffic impacts, noise, and dust control. FCG will contact managers of each establishment in the area and explain to them the nature of closures and detours, and parking restrictions. 14) Progress Payments and Grant/Fund Tracking - The FCG’s CM will manage the project’s budget and will set up an internet-based document controls system. The team will prepare independent monthly estimates for the Project duration, review payment requests, make payment recommendations, and prepare progress payments in the City’s standard format monitoring both the project and contingency budgets. Our report to City of Pico Rivera will include amount paid to contractor to date, previously paid amount to contractor, percent complete of each bid item, executed change orders, and retention withheld from each pay estimate. Our intent is to keep the City of Pico Rivera fully informed of the financial status of the project.
15) Change Order Management - The FCG Team will work with the City of Pico Rivera during the construction contract award and change order process to assist City of Pico Rivera in controlling the costs of the project and controlling the factors that may escalate project costs. The FCG Team will receive, process, track, and document project requests for contract change orders from the Contractor and a CCO log will be established at the beginning of the Project and will be continuously maintained and updated by the RE. To the delegated level of approval, and under the City of Pico Rivera’s direction, the FCG Team will determine the need, merit, scope, estimated cost, and schedule impacts to the project because of potential contract change orders. The FCG Team will also negotiate change orders with Contractor as directed. Once merit is established, The RE will prepare change orders based on the Contract Documents and in close coordination with the Design Engineer and City Project Manager. 16) Permit Monitoring - The FCG team is highly experienced in coordinating with regulatory agencies and R/W permits and understands the criticality of keeping them informed and involved during the project, The FCG team is currently providing these same types of services to Cities of Irwindale, Downey, Burbank, and other municipalities and agencies throughout the state. The FCG Team utilizes a system for tracking regulatory, building and public works permits using a spreadsheet. This system is simple and allows the permittee and City officials to view the current budget and status of each permit. The FCG Team will keep every agency involved should any changes or modifications are needed.

The FCG Team will ensure that the baseline schedule submitted by the contractor includes the permits requirements. 17) SWPPP & Erosion/Sediment Control Monitoring – As previously stated, the FCG Team includes members certified as Qualified Stormwater Developers (QSD) with applicable certifications. We will review the contractor’s SWPPP to ensure compliance with the Regional Water Quality Control Board (RWQCB) permit requirements. We will conduct regular inspections of the site with the contractor and upload reports and documents to the SMARTS database. Our team will ensure the contractor adheres to the approved SWPPP plan and installs and maintains appropriate BMPs. 18) Claims & Disputes Prevention/Mitigation - The FCG Team’s renowned claims division and our claims experts have a proven track record with Caltrans and other public agencies on similar projects. We will monitor all site records of events, labor, materials and equipment for potential claims or dispute issues. This data will be essential when analyzing the contractor’s CPM schedule and claims. Our team will address every issue that will contain all relevant RFI’s, change orders, correspondence, pictures, inspector’s dairies, cost analysis and schedule analysis. Our objective will be to minimize issues by providing concise analysis of all issues on the project. Our Resident Engineer will establish an open communication plan with the Contractor to discuss all project matters and will respond to all issues timely to minimize any potential for claims. Typically, claims arise from lack or shortage of communication and delay in response to RFI’s and change order requests. The FCG Team will address all concerns, RFI’s, and change order requests in a timely manner and will document all matters in case a claim is submitted. The FCG Team has experience reviewing and responding to claims arbitration to resolve such matters.

Page 24 ends

WORK APPROACH
City of Pico Rivera – RFP for
Construction Management and Construction Inspection Services 19) Comply with Federal and State Grant Requirements Including Reimbursements – The FCG Team has extensive experience working on federally funded projects that utilize FHWA and Local Assistance Procedures Manual requirements for documentation and filing, verifying certified payroll of contractors, and producing documentation and reports accordingly. We estimate that 90% of the projects we manage are Federally funded projects. 20) Comply with CDBG Requirements - The FCG Team has extensive experience working on CDBG grants and will submit all required quarterly reports, project performance measurement plan, preconstruction checklist, amendment to the original agreement, etc. In addition, the FCG Team will assist the City in incorporating the CDBG requirement in the contract special provisions
21) Project Closeout - The FCG Team will recommend to City of Agoura Hills that final acceptance be issued to the contractor when all punch-list work is completed, and all issues and Project walks are signed off by City of Agoura Hills, LACFCD, LVMWD, and Utility Companies. Finally, all as-builts will be inventoried and verified completely prior to final acceptance and recommendation of final payment to the contractor. The FCG Team will perform the project closeout as follows:
 Coordinate a final walk-through with all affected stakeholders, prepare the punch list, certify completion of the project, and recommend acceptance.
 Transmit the contractor’s approved Record Drawings (As-Builts) to the City. Provide an electronic version of all drawings. Provide paper and electronic files of all construction documents in the City’s approved format.  Finalize record drawings, contract bid items, claims, change orders, and punch list items.  Prepare all final reports, including report of completion for acceptance of the project.  Finalize and deliver all construction files to the City for archives.  Address any unresolved issues including, but not limited to, change orders, claims, etc.  Complete documentation required by LAPM.
 Prepare and submit the final payment package to the contractor.  Submit final project records to the City of Pico Rivera.  Collect and submit to the City of Pico Rivera release of any liens from the contractor.  FCG Team will prepare Notice of Completion and will coordinate with permittees and City for acceptance.  Submit final funding reimbursement request to the State and any other funding sources. 22) On-Call Services - Staff augmentation is very important to many public agencies for various reasons, including lack of funding for procurement of agency staff, and/or the immediate need based on the number of projects or the funding.

In many instances there may be a combination of reasons why public agencies refer to procuring on-call contracts that produce a level of comfort through hiring outside agencies. FCG fully understands the on-call business and will implement this knowledge to meet the needs of the City.

On-call contracts can be very dynamic in nature. As projects surface for construction so does the need for additional staff. FCG understands that a well-defined communication plan with the agencies can achieve better results. As the need for additional staff increases, our responsiveness to meet the need is imperative for the success of the project.

Responsiveness to immediate and/or planned need for staffing is key since the need may not always be planned.

FCG is always ready to provide staff for agencies, planned or otherwise. 23) Design Support Services - FCG offers Specifications Development and review and can generate project specific special provisions (Green Book – 2021 or older). FCG also offers Peer Design review. 24) Asset Assessment and Report - FCG will assess the current concrete conditions (damaged, cracked, displaced, and ADA) of the entire length of proposed project and other miscellaneous areas concrete facilities (sidewalks, curbs and gutters, ramps, driveway approaches, spandrels, and cross gutters, etc.) and other areas as assigned.

Page 25 ends

CLIENT REFERENCES
City of Pico Rivera – RFP for
Construction Management and Construction Inspection Services

PROJECT SPECIFIC EXPERIENCE
City of Downey On-Call Public Works Construction Management and Inspection Services
Services Description
This contract includes performing construction management and construction inspection on the city’s various capital improvement projects. The construction manager is responsible for the administrative aspects of the projects, and the inspectors are responsible for overseeing the construction of the various projects according to the project’s plans and specifications, work permits, and day to day inspection activities on construction jobs. Capital improvements projects includes street and intersection widening, pavement rehabilitation and reconstruction, water and sewer improvements, streetscape enhancements, landscaping and irrigation, drainage, sidewalks, curb ramps, and other pedestrian improvements. Duties and responsibilities of the construction manager and inspectors include, but not limited to project review and plan check, construction observation, project coordination including communications with the city, meetings, and keeping projects on schedule and within budget, and administrative.

Scope of Services
FCG performes construction management and inspection services on various CIP projects for the City of Downey. Work included traffic control, removals, concrete and asphalt paving, curb and gutter, ADA ramps, sidewalk, street lighting, traffic signals, service connections, drainage, landscape, and striping.

Sample Projects
- Florence Avenue Pavement Rehabilitation Project: Project consisted of removal and replacement of existing asphalt pavement, striping and installation of pavement marking, curb, gutter, cross gutters, sidewalk, ADA ramps. - 5th Street Pavement Rehabilitation Project: Project consisted of pavement rehabilitation of 5th Street, between Brookshire Avenue and Lakewood Boulevard including 3 cul-de-sacs. This project included reconstruction of failed pavement areas, cold milling of asphalt pavement, construction of asphalt concrete (AC) base course and asphalt rubber hot mix (ARHM) overlay, striping, and installation of pavement markings. - Woodruff Avenue Traffic Signal Fiber Optic Communication System and Upgrades Project: Project consisted of upgrading the existing fiber optic system and traffic signal at various signalized intersections. This project also included installation of conduits, innerducts, pull boxes, various fiber optic cables, communication equipment, hub cabinets, controllers, and traffic signal modification integration.

Client Information
Client City of Downey Contact Ed Norris, PE, Deputy Director of Public Works 11111 Brookshire Avenue
Downey, CA 90241
(562) 904-7110
[email protected]
Dates 02/2016 – Ongoing Cost $Various per project
Staff A.B. Fakhouri, PM; Anthony Moussa, Inspector; Talal Alfakhouri, Inspector, Jasmine Fakhouri, OE

Page 26 ends

CLIENT REFERENCES
City of Pico Rivera – RFP for
Construction Management and Construction Inspection Services City of Irwindale As-Needed Construction Inspection Services Services Description
This contract includes performing construction inspection on the city’s various public works projects in the City of Irwindale. The construction manager is responsible for the administrative aspects of the projects, and the inspectors are responsible for overseeing the construction of the various projects according to the project’s plans and specifications, work permits, and day to day inspection activities on construction jobs. The various projects in the City of Irwindale involve all local utility companies as well as small city projects.

Scope of Services
FCG performes construction management and inspection services. Work included traffic control, removals, concrete and asphalt paving, curb and gutter, ADA ramps, sidewalk, street lighting, traffic signals, service connections, drainage, landscape, striping, and more.

Sample Projects
- Senior Center Interior Remodel Improvements Project: Project consisted of remodeling improvements on the center’s interior. FCG’s inspector performed inspection in accordance with the project plans and special provisions, the standard specifications, and the “Los Angeles County Building Code”. - Water Pipeline Extension Project: Project consisted of construction management and inspection for the Water Pipeline Extension Project located on Live Oak Avenue
- Off-Site Improvements at the Park at Live Oak Project: Project consisted of construction of new sidewalk, median and parkway landscaping / irrigation, two new traffic signal intersections, on traffic signal intersection modification, resurfacing and restriping, and water and sewer pipe installation.
- 2022-2023 Resurfacing Project, Residential Resurfacing Phase II: Project consisted of resurfacing eight (8) residential streets, improving the striping at an arterial intersection, and minor concrete removal and restorations. - Constructability Review Services for Irwindale Park Improvements Phase IV & V Project Client Information
Client City of Irwindale Contact Arsanious Hanna, PE – Former City Engineer 16102 Arrow Highway
Irwindale, CA 91706
(562) 477-5747
[email protected]
Dates 11/2018 – Ongoing Cost $Various per project
Staff A.B. Fakhouri, PM; Anthony Moussa, Inspector; Jasmine Fakhouri, OE.

Page 27 ends

CLIENT REFERENCES
City of Pico Rivera – RFP for
Construction Management and Construction Inspection Services City of Burbank On-Call Construction Management and Construction Inspection Services Services Description
This contract includes performing construction inspection on the city’s various public works projects in the City of Burbank. The various projects in the City of Burbank include Traffic Signals installation and modification, Street Pavement and Rehabilitation and Improvements.

Scope of Services
FCG performes construction management and inspection services. Work included traffic control, removals, concrete and asphalt paving, curb and gutter, ADA ramps, sidewalk, street lighting, traffic signals, service connections, drainage, landscape, striping, and more.

Sample Projects
- Bid Schedule 1426 – Media District Traffic Signal Improvements Project: Project consisted of street improvements at 3 locations, traffic signal modifications at 8 locations and signing and striping modifications. - Bid Schedule 1461 – Traffic Responsive Signal System Project: Project consisted of reconstruction of three traffic signals and installation of 8000 feet of conduit for fiber optic cable, new poles, pull boxes, conduits, conductions, video cameras, loops, and curb ramps
- Bid Schedule 1462 – Midtown Commercial Corridors Improvement Project: Project consisted of reconstruction of 6 traffic signals, removal and replacement of poles at 8 traffic signals, and install LED lighting and loop detector conduits at 29 traffic signals.
- Bid Schedule 1454 – Glenoaks Blvd Arterial and First Street Signal Improvements Project: Project is funded by Metro Measure R and consists of traffic signal modification for 13 intersections along Glenoaks Blvd, and 1 intersection on Orange Grove Ave. and 1st Street. Improvements include removing and installing new signal poles, signal heads, pull boxes, conduits, LED luminaires, markings, audible pedestrian signals (APS). detection loops. ADA ramps, AC pavement restoration, and signage.
- Bid Schedule 1436 – City Parking Lot Resurfacing: Project consisted of resurfacing of Parking Lot - Bid Schedule 1458 – Various Streets Improvements
- Bid Schedule 1506 - Annual Arterial Pavement Rehabilitation Project - Bid Schedule 1427 – Construction Management services for the Measure R I-5 Project Client Information
Client City of Burbank Contact Omar Moheize, PE – Former Principal Engineer 150 North Third Street
Burbank, CA 91502
(818) 238.3943
[email protected]
Dates 02/2016 – Ongoing Cost $Various per project
Staff A.B. Fakhouri, PM; Anthony Moussa, Leon Fuentes, Talal Alfakhouri, Inspector; Jasmine Fakhouri, OE

Page 28 ends

22885 Savi Ranch Parkway, Suite G, Yorba Linda, CA 92807 | P: (714) 312-0317 | F: (714) 312-0793 Construction Management | Construction Inspection | Plan Checking

SCHEDULE OF HOURLY RATE
FCG CONSULTANTS, INC. 2024 PROFESSIONAL RATES

CLASSIFICATION HOURLY RATES
Senior Project Manager* .................................................................................................................................... $276.88 Project Manager* ........................................................................................................................................................... $251.92 Resident Engineer* ......................................................................................................................................................... $233.76 Construction Manager* .................................................................................................................................................. $233.76 Structures Representative* ........................................................................................................................................... $233.76 Construction Inspector* ................................................................................................................................................. $147.52 Office Engineer .............................................................................................................................................................. $102.13 Scheduler* .............................................................................................................................................................. $192.91 Estimator* .............................................................................................................................................................. $192.91 Senior Plan Checker* ..................................................................................................................................................... $233.76 Plan Checker* .............................................................................................................................................................. $165.67 Assistant Plan Checker* ............................................................................................................................................... $113.74 Overtime and Weekend work is not included. Overtime is charged at 1.5 x the actual rate, and double time is to be charged at 2 x the actual rate.

ODC’s will be charged at cost.

Onsite / Offsite personnel rates are billed at the same rate based on Federal Acquisition Regulations (FARs).

Per Q&A released on January 30, 2024, the rates are fixed for the first 3 years, and subject to adjustments after year 3 on a case-by-case basis.

Page 29 ends

Hill International, Inc.

Western Region Headquarters
100 Spectrum Center Drive, Suite 550
Irvine, CA 92618
Tel: 949-474-2908
January 30, 2024
FCG Consultants, Inc.
22885 Savi Ranch Parkway, Suite G
Yorba Linda, CA 92887
Attn: Ms. Maha Fakhouri, President
Subject: City of Pico Rivera | On-Call Construction Management and Inspection Services | RFP Reference: Proposal - Hourly Rate Schedule
Dear Ms. Fakhouri:

Hill International is pleased to submit our hourly rate schedule associated with the City of Pico Rivera OnCall Construction Management and Inspection Services proposal.

HILL INTERNATIONAL, INC. - HOURLY RATE SCHEDULE

CATEGORY OF STAFF ON-SITE HOURLY RATE OFF-SITE HOURLY RATE Construction Manager $276 $330
Construction Inspector $212 $253
Legal Name of Firm
Hill International, Inc.

Federal Tax ID
FEIN #20-0953973
California Department of Industrial Relations
DIR #1000019597
Primary Point-of-Contact
Juan Pablo (J.P.) Villamizar, Senior Vice President
Tel: 949-748-5485 | Mobile: 949-324-5313
[email protected]
Signature Authority
Juan Pablo (J.P.) Villamizar, Senior Vice President is authorized under the bylaws of Hill International, Inc. to execute contracts or otherwise bind the company.

Should you have any questions, or require additional information, please contact me at 949-324-5313 or [email protected].

Sincerely,
Juan Pablo (J.P.) Villamizar,
Senior Vice President

SCHEDULE OF HOURLY RATE SC

Page 30 ends

18 Crestview Aliso Vijeo, CA 92656 | P: (949) 535-0533 | https://pacificpros.com/ Project Management | Construction Management | Construction Inspection Pacific Pros 2024 PROFESSIONAL RATES

CLASSIFICATION HOURLY RATES
Project Manager/Construction Manager ..................................................................................................... $242.55 - $277.20 Resident Engineer/Structure Representative ............................................................................................. $242.55 - $277.20 Scheduler/Estimator ...................................................................................................................................... $242.55 - $277.20 Assistant Construction Manager .................................................................................................................. $196.35 - $221.76 Inspector .............................................................................................................................................. $184.80 - $219.45 Special Inspector ............................................................................................................................................................ $196.35 Office Engineer .............................................................................................................................................................. $161.70 Office Admin ................................................................................................................................................................ $92.40 Notes:

1. For classifications with a given range, the billing rate will be based on the actual base rate paid to the staff, which will not exceed the upper limit, i.e., the Not-To-Exceed (NTE) hourly rate amount.

2. Hourly rates are proposed fixed for three years. For subsequent years 3% escalation rate, pending the City approval on a case-by-case basis per the City response to the RFP Question 1.18.

3. When authorized by the City, overtime premium shall be charged per DIR prevailing wage requirements with one-and-a-half and double-time premium when required by Law.

4. Rental field office will be charged at cost as Other Direct Cost (ODC).

SCHEDULE OF HOURLY RATE SC

Page 31 ends

PRICING
PMCS GROUP, INC. PRICING

CITY OF PICO RIVERA
*Onsite and Offsite Pricing
Classification Fully Burdened
Sr. Project Manager $272.25
Project Manager $249.56
Resident Engineer $233.68
Construction Manager $233.68
Office Engineer / Labor Compliance $111.17
Sr. Scheduler $199.65
Scheduler $190.58
Sr. Estimator $199.65
Estimator $190.58
Inspector – Regular Shift Hours $147.52
Overtime and Weekend work is not included. Overtime is charged at 1.5 x the actual rate, and double time is to be charged at 2 x the actual rate.

ODC’s will be charged at cost.

Onsite / Offsite personnel rates are billed at the same rate based on Federal Acquisition Regulations (FARs).

Per Q&A released on January 30, 2024, the rates are fixed for the first 3 years, and subject to adjustments after year 3 on a case-by-case basis.

SCHEDULE OF HOURLY RATE SC

Page 32 ends

Construction Management
Construction Inspection
17011 Beach Blvd. Suite 900, Huntington Beach, CA 92674 | (714) 475-4706 SAMSA ENGINEERING, INC. RATE SHEET

CLASSIFICATION HOURLY RATE
Senior Project Manager* ............................................................................................. $279.98 Assistant Project Manager* .................................................................................................. $170.88 Structures Representative* ................................................................................................... $184.82 Office Engineer* .................................................................................................................... $104.61 Construction Inspector* ........................................................................................................ $149.15 Structures Inspector* ............................................................................................................ $162.09 *Non-exempt employees are subject to prevailing wage requirements.

SCHEDULE OF HOURLY RATE SC

Page 33 ends

14252 Culver Drive , A-296 Irvine, CA 92604 | P: (949) 379-4481 | Construction Management | Construction Claims | Scheduler CEMS, Inc. CONSULTANTS, INC. 2024 PROFESSIONAL RATES

CLASSIFICATION HOURLY RATES
Project Manager* ........................................................................................................................................................... $250.00 Construction Manager* .................................................................................................................................................. $230.00 Construction Claims ...................................................................................................................................................... $200.00 Scheduler* .............................................................................................................................................................. $170.00 *Non-Exempt Employees are subject to prevailing wage requirements

SCHEDULE OF HOURLY RATE SC

Page 34 ends

Pico Rivera On-Call
Destination Enterprises Rate Sheet
Position Base Contract
Rate
Years 1-3
Base Contract
Rate
Year 4
Base Contract
Rate
Year 5
MEP Inspector $ 178.72 $ 184.08 $ 189.60
Systems & Electrical Inspector $ 216.16 $ 222.64 $ 229.32 Inspector $ 187.07 $ 192.68 $ 198.46
QA Manager $ 187.07 $ 192.68 $ 198.46
Construction Manager $ 191.87 $ 197.63 $ 203.55
Senior Scheduler $ 203.86 $ 209.98 $ 216.28
Project Scheduler $ 143.90 $ 148.22 $ 152.66
Senior Estimator $ 215.85 $ 222.33 $ 229.00

SCHEDULE OF HOURLY RATE SC

Page 35 ends

Schedule of Fees and General Terms
Personnel Charges - Professional Staff
Product Name Units Rate ($)
Project Engineer HR $190.00
Administrative HR $70.00
Principal Engineer HR $220.00
Staff Engineer HR $145.00
Project Manager HR $165.00
Principal Geologist HR $200.00
Project Geologist HR $180.00
Qualified SWPPP Developer QSD HR $160.00
Staff Geologist HR $145.00
Qualified SWPPP Practitioner QSP
Personnel Charges - Field Staff
HR $150.00
Product Name Units Rate ($)
Engineering Technician HR $140.00
Lead Roadway and Structures Inspector HR $150.00
StructuresInspector HR $150.00
Roadway Inspector HR $140.00
Special Inspector (ICC) HR $140.00
Mechanical | Electrical Inspector HR $155.00
Pick‐up and Delivery of Test Specimens HR $100.00
Coatings Technician HR $150.00
Pull | Torque Testing Technician HR $140.00
Asphalt Coring HR $145.00
Supervising Public Works Inspector HR $160.00
Quality Control Manager HR $165.00
Laboratory Tests - Soil
Product Name
Units Rate ($)
ASTM D4318 Plasticity Index of Soils EA $335.00
ASTM D1883 California Bearing Ratio EA $750.00
ASTM D2435 Consolidation EA $295.00
ASTM D2435 Consolidation with Time Rate EA $355.00
ASTM D3080 Direct Shear, Consol&Drained EA $285.00
ASTM D4829 Expansion Index of Soils EA $270.00
ASTM D2166 Unconfined Comp Strength EA $335.00
ASTM D5333 Hydro Collapse Potential EA $260.00
ASTM D2050 Tri‐Axial Shear Strength EA $550.00
ASTM D2937 In‐Place Density, Drive Cyl EA $75.00
ASTM D2216 Soil Moisture Content by Mass EA $55.00
ASTM D698 Maximum Density Std Effort EA $350.00
ASTM D1557 Max Density Optimum Moisture EA $350.00
ASTM D2974 Moisture, Ash, Organic Matter EA $120.00
ASTM D4972 pH of Soils EA $125.00
ASTM D2844 R‐Value & Expansive Pressures EA $480.00
ASTM D2434 Const Head Permeability Test EA $470.00
ASTM D422 Sieve Analysis of Soil EA $260.00
ASTM D1140 Materials Finer than #200 EA $160.00
ASTM D422 Hydrometer Anaylsis EA $395.00
ASTM D4546 Swell Potential EA $260.00
ASTM D854 Specific Gravity of Soils EA $295.00
ASTM D4943 Shrinkage Factor by Resin EA $290.00
ASTM D559 Soil Cement Sample Preparation EA $160.00
ASTM D558 Soil‐Cement Maximum Density EA $395.00
ASTM D1633 Compression Test Soil Cement EA $130.00

SCHEDULE OF HOURLY RATE SC

Page 36 ends

Schedule of Fees and General Terms

TERMS AND CONDITIONS

GENERAL CHARGES
RMA Group requires twenty‐four (24) hour prior notification for scheduling inspectors and/or technicians.

Inspection charges start at the scheduled show up time at the job site. All inspection hours will be billed in the following increments:

There will be a minimum two (2) hour charge for any RMA Group employee presence on site.

Any time less than four (4) hours of work will be billed as four (4) hours.

Four (4) to eight (8) hours will be billed as eight (8) hours.

When personnel are required to work in excess of 5 hours without an uninterrupted meal period of 30 minutes, due to project constraints, ½ hour will be charged at double time rates in addition to any applicable hours worked.

Rates are valid through December 31, 2026. Rates for personnel will increase by 5% per year on January 1st of each subsequent year. Outside services will be billed at cost plus 15% unless billed directly to and paid for by Client.

OVERTIME CHARGES
Work performed in excess of 8 hours per day and / or up to eight (8) hours on Saturdays will be billed at 1.50 times the unit rate.

Work performed on Sunday, recognized holidays, orin excess of eight (8) hours on Saturdays will be billed at 2.00 times the unit rate.

A 20% surcharge will be applied for laboratory tests performed on a Saturday or Sunday.

NIGHT WORK
A $10.00 per hour surcharge will be added to all personnel rates for work performed during night shifts.

SCHEDULE OF HOURLY RATE SC

Page 37 ends

APPENDIX
City of Pico Rivera – RFP for
Construction Management and Construction Inspection Services

NON -COLLUSION AFFIDAVIT

Page 38 ends

22885 Savi Ranch Parkway, Suite G
Yorba Linda, California 92887
Tele | 714.312.0317
Fax | 714.312.0793
www.fcgconsultants.com
Grade Separations
Railroad
Transit
Highways
Freeways
Bridges
Water Lines
Sewer Lines
Wastewater
Street Lighting
Signalized Intersections
Fiber Optics
Landscape
Hardscape
Striping
SWPPP
Capital Improvements
Public Works
Transportation
Design-Build
CMGC
Ports
Airports
School Districts
Trusted
Partner
for
Construction
Management
and Inspection
Services
Professional Services Agreement
FCG CONSULTANTS, INC.

Page 16 of 19 ends

EXHIBIT B

APPROVED FEE SCHEDULE
(SCHEDULE OF HOURLY LABOR RATES AND REIMBURSABLE)
22885 Savi Ranch Parkway, Suite G, Yorba Linda, CA 92807 | P: (714) 312-0317 | F: (714) 312-0793 Construction Management | Construction Inspection | Plan Checking

SCHEDULE OF HOURLY RATE
FCG CONSULTANTS, INC. 2024 PROFESSIONAL RATES

CLASSIFICATION HOURLY RATES
Senior Project Manager* .................................................................................................................................... $276.88 Project Manager* ........................................................................................................................................................... $251.92 Resident Engineer* ......................................................................................................................................................... $233.76 Construction Manager* .................................................................................................................................................. $233.76 Structures Representative* ........................................................................................................................................... $233.76 Construction Inspector* ................................................................................................................................................. $147.52 Office Engineer .............................................................................................................................................................. $102.13 Scheduler* .............................................................................................................................................................. $192.91 Estimator* .............................................................................................................................................................. $192.91 Senior Plan Checker* ..................................................................................................................................................... $233.76 Plan Checker* .............................................................................................................................................................. $165.67 Assistant Plan Checker* ............................................................................................................................................... $113.74 Overtime and Weekend work is not included. Overtime is charged at 1.5 x the actual rate, and double time is to be charged at 2 x the actual rate.

ODC’s will be charged at cost.

Onsite / Offsite personnel rates are billed at the same rate based on Federal Acquisition Regulations (FARs).

Per Q&A released on January 30, 2024, the rates are fixed for the first 3 years, and subject to adjustments after year 3 on a case-by-case basis.

Page 29 ends

Hill International, Inc.

Western Region Headquarters
100 Spectrum Center Drive, Suite 550
Irvine, CA 92618
Tel: 949-474-2908
January 30, 2024
FCG Consultants, Inc.
22885 Savi Ranch Parkway, Suite G
Yorba Linda, CA 92887
Attn: Ms. Maha Fakhouri, President
Subject: City of Pico Rivera | On-Call Construction Management and Inspection Services | RFP Reference: Proposal - Hourly Rate Schedule
Dear Ms. Fakhouri:

Hill International is pleased to submit our hourly rate schedule associated with the City of Pico Rivera OnCall Construction Management and Inspection Services proposal.

HILL INTERNATIONAL, INC. - HOURLY RATE SCHEDULE

CATEGORY OF STAFF ON-SITE HOURLY RATE OFF-SITE HOURLY RATE Construction Manager $276 $330
Construction Inspector $212 $253
Legal Name of Firm
Hill International, Inc.

Federal Tax ID
FEIN #20-0953973
California Department of Industrial Relations
DIR #1000019597
Primary Point-of-Contact
Juan Pablo (J.P.) Villamizar, Senior Vice President
Tel: 949-748-5485 | Mobile: 949-324-5313
[email protected]
Signature Authority
Juan Pablo (J.P.) Villamizar, Senior Vice President is authorized under the bylaws of Hill International, Inc. to execute contracts or otherwise bind the company.

Should you have any questions, or require additional information, please contact me at 949-324-5313 or [email protected].

Sincerely,
Juan Pablo (J.P.) Villamizar,
Senior Vice President

SCHEDULE OF HOURLY RATE SC

Page 30 ends

18 Crestview Aliso Vijeo, CA 92656 | P: (949) 535-0533 | https://pacificpros.com/ Project Management | Construction Management | Construction Inspection Pacific Pros 2024 PROFESSIONAL RATES

CLASSIFICATION HOURLY RATES
Project Manager/Construction Manager ..................................................................................................... $242.55 - $277.20 Resident Engineer/Structure Representative ............................................................................................. $242.55 - $277.20 Scheduler/Estimator ...................................................................................................................................... $242.55 - $277.20 Assistant Construction Manager .................................................................................................................. $196.35 - $221.76 Inspector .............................................................................................................................................. $184.80 - $219.45 Special Inspector ............................................................................................................................................................ $196.35 Office Engineer .............................................................................................................................................................. $161.70 Office Admin ................................................................................................................................................................ $92.40 Notes:

1. For classifications with a given range, the billing rate will be based on the actual base rate paid to the staff, which will not exceed the upper limit, i.e., the Not-To-Exceed (NTE) hourly rate amount.

2. Hourly rates are proposed fixed for three years. For subsequent years 3% escalation rate, pending the City approval on a case-by-case basis per the City response to the RFP Question 1.18.

3. When authorized by the City, overtime premium shall be charged per DIR prevailing wage requirements with one-and-a-half and double-time premium when required by Law.

4. Rental field office will be charged at cost as Other Direct Cost (ODC).

SCHEDULE OF HOURLY RATE SC

Page 31 ends

PRICING
PMCS GROUP, INC. PRICING

CITY OF PICO RIVERA
*Onsite and Offsite Pricing
Classification Fully Burdened
Sr. Project Manager $272.25
Project Manager $249.56
Resident Engineer $233.68
Construction Manager $233.68
Office Engineer / Labor Compliance $111.17
Sr. Scheduler $199.65
Scheduler $190.58
Sr. Estimator $199.65
Estimator $190.58
Inspector – Regular Shift Hours $147.52
Overtime and Weekend work is not included. Overtime is charged at 1.5 x the actual rate, and double time is to be charged at 2 x the actual rate.

ODC’s will be charged at cost.

Onsite / Offsite personnel rates are billed at the same rate based on Federal Acquisition Regulations (FARs).

Per Q&A released on January 30, 2024, the rates are fixed for the first 3 years, and subject to adjustments after year 3 on a case-by-case basis.

SCHEDULE OF HOURLY RATE SC

Page 32 ends

Construction Management
Construction Inspection
17011 Beach Blvd. Suite 900, Huntington Beach, CA 92674 | (714) 475-4706 SAMSA ENGINEERING, INC. RATE SHEET

CLASSIFICATION HOURLY RATE
Senior Project Manager* ............................................................................................. $279.98 Assistant Project Manager* .................................................................................................. $170.88 Structures Representative* ................................................................................................... $184.82 Office Engineer* .................................................................................................................... $104.61 Construction Inspector* ........................................................................................................ $149.15 Structures Inspector* ............................................................................................................ $162.09 *Non-exempt employees are subject to prevailing wage requirements.

SCHEDULE OF HOURLY RATE SC

Page 33 ends

14252 Culver Drive , A-296 Irvine, CA 92604 | P: (949) 379-4481 | Construction Management | Construction Claims | Scheduler CEMS, Inc. CONSULTANTS, INC. 2024 PROFESSIONAL RATES

CLASSIFICATION HOURLY RATES
Project Manager* ........................................................................................................................................................... $250.00 Construction Manager* .................................................................................................................................................. $230.00 Construction Claims ...................................................................................................................................................... $200.00 Scheduler* .............................................................................................................................................................. $170.00 *Non-Exempt Employees are subject to prevailing wage requirements

SCHEDULE OF HOURLY RATE SC

Page 34 ends

Pico Rivera On-Call
Destination Enterprises Rate Sheet
Position Base Contract
Rate
Years 1-3
Base Contract
Rate
Year 4
Base Contract
Rate
Year 5
MEP Inspector $ 178.72 $ 184.08 $ 189.60
Systems & Electrical Inspector $ 216.16 $ 222.64 $ 229.32 Inspector $ 187.07 $ 192.68 $ 198.46
QA Manager $ 187.07 $ 192.68 $ 198.46
Construction Manager $ 191.87 $ 197.63 $ 203.55
Senior Scheduler $ 203.86 $ 209.98 $ 216.28
Project Scheduler $ 143.90 $ 148.22 $ 152.66
Senior Estimator $ 215.85 $ 222.33 $ 229.00

SCHEDULE OF HOURLY RATE SC

Page 35 ends

Schedule of Fees and General Terms
Personnel Charges - Professional Staff
Product Name Units Rate ($)
Project Engineer HR $190.00
Administrative HR $70.00
Principal Engineer HR $220.00
Staff Engineer HR $145.00
Project Manager HR $165.00
Principal Geologist HR $200.00
Project Geologist HR $180.00
Qualified SWPPP Developer QSD HR $160.00
Staff Geologist HR $145.00
Qualified SWPPP Practitioner QSP
Personnel Charges - Field Staff
HR $150.00
Product Name Units Rate ($)
Engineering Technician HR $140.00
Lead Roadway and Structures Inspector HR $150.00
StructuresInspector HR $150.00
Roadway Inspector HR $140.00
Special Inspector (ICC) HR $140.00
Mechanical | Electrical Inspector HR $155.00
Pick‐up and Delivery of Test Specimens HR $100.00
Coatings Technician HR $150.00
Pull | Torque Testing Technician HR $140.00
Asphalt Coring HR $145.00
Supervising Public Works Inspector HR $160.00
Quality Control Manager HR $165.00
Laboratory Tests - Soil
Product Name
Units Rate ($)
ASTM D4318 Plasticity Index of Soils EA $335.00
ASTM D1883 California Bearing Ratio EA $750.00
ASTM D2435 Consolidation EA $295.00
ASTM D2435 Consolidation with Time Rate EA $355.00
ASTM D3080 Direct Shear, Consol&Drained EA $285.00
ASTM D4829 Expansion Index of Soils EA $270.00
ASTM D2166 Unconfined Comp Strength EA $335.00
ASTM D5333 Hydro Collapse Potential EA $260.00
ASTM D2050 Tri‐Axial Shear Strength EA $550.00
ASTM D2937 In‐Place Density, Drive Cyl EA $75.00
ASTM D2216 Soil Moisture Content by Mass EA $55.00
ASTM D698 Maximum Density Std Effort EA $350.00
ASTM D1557 Max Density Optimum Moisture EA $350.00
ASTM D2974 Moisture, Ash, Organic Matter EA $120.00
ASTM D4972 pH of Soils EA $125.00
ASTM D2844 R‐Value & Expansive Pressures EA $480.00
ASTM D2434 Const Head Permeability Test EA $470.00
ASTM D422 Sieve Analysis of Soil EA $260.00
ASTM D1140 Materials Finer than #200 EA $160.00
ASTM D422 Hydrometer Anaylsis EA $395.00
ASTM D4546 Swell Potential EA $260.00
ASTM D854 Specific Gravity of Soils EA $295.00
ASTM D4943 Shrinkage Factor by Resin EA $290.00
ASTM D559 Soil Cement Sample Preparation EA $160.00
ASTM D558 Soil‐Cement Maximum Density EA $395.00
ASTM D1633 Compression Test Soil Cement EA $130.00

SCHEDULE OF HOURLY RATE SC

Page 36 ends

Schedule of Fees and General Terms

TERMS AND CONDITIONS

GENERAL CHARGES
RMA Group requires twenty‐four (24) hour prior notification for scheduling inspectors and/or technicians.

Inspection charges start at the scheduled show up time at the job site. All inspection hours will be billed in the following increments:

There will be a minimum two (2) hour charge for any RMA Group employee presence on site.

Any time less than four (4) hours of work will be billed as four (4) hours.

Four (4) to eight (8) hours will be billed as eight (8) hours.

When personnel are required to work in excess of 5 hours without an uninterrupted meal period of 30 minutes, due to project constraints, ½ hour will be charged at double time rates in addition to any applicable hours worked.

Rates are valid through December 31, 2026. Rates for personnel will increase by 5% per year on January 1st of each subsequent year. Outside services will be billed at cost plus 15% unless billed directly to and paid for by Client.

OVERTIME CHARGES
Work performed in excess of 8 hours per day and / or up to eight (8) hours on Saturdays will be billed at 1.50 times the unit rate.

Work performed on Sunday, recognized holidays, orin excess of eight (8) hours on Saturdays will be billed at 2.00 times the unit rate.

A 20% surcharge will be applied for laboratory tests performed on a Saturday or Sunday.

NIGHT WORK
A $10.00 per hour surcharge will be added to all personnel rates for work performed during night shifts.

SCHEDULE OF HOURLY RATE SC

Page 37 ends

Professional Services Agreement
FCG CONSULTANTS, INC.

Page 17 of 19 ends

EXHIBIT C

TERMS FOR COMPLIANCE WITH CALIFORNIA LABOR LAW REQUIREMENTS

1. This Agreement calls for services that, in whole or in part, constitute “public works” as defined in Division 2, Part 7, Chapter 1 (commencing with Section 1720) of the California Labor Code (“Chapter 1”). Further, Consultant acknowledges that this Agreement is subject to (a) Chapter 1 and (b) the rules and regulations established by the Department of Industrial Relations (“DIR”) implementing such statutes.

Therefore, as to those Services that are “public works”, Consultant shall comply with and be bound by all the terms, rules and regulations described in 1(a) and 1(b) as though set forth in full herein.

2. California law requires the inclusion of specific Labor Code provisions in certain contracts. The inclusion of such specific provisions below, whether or not required by California law, does not alter the meaning or scope of Section 1 above.

3. Consultant shall be registered with the Department of Industrial Relations in accordance with California Labor Code Section 1725.5, and has provided proof of registration to City prior to the Effective Date of this Agreement. Consultant shall not perform work with any subconsultant that is not registered with DIR pursuant to Section 1725.5. Consultant and subconsultants shall maintain their registration with the DIR in effect throughout the duration of this Agreement. If the Consultant or any subconsultant ceases to be registered with DIR at any time during the duration of the project, Consultant shall immediately notify City.

4. Pursuant to Labor Code Section 1771.4, Consultant’s Services are subject to compliance monitoring and enforcement by DIR. Consultant shall post job site notices, as prescribed by DIR regulations.

5. Pursuant to Labor Code Section 1773.2, copies of the prevailing rate of per diem wages for each craft, classification, or type of worker needed to perform the Agreement are on file at City Hall and will be made available to any interested party on request. Consultant acknowledges receipt of a copy of the DIR determination of such prevailing rate of per diem wages, and Consultant shall post such rates at each job site covered by this Agreement.

6. Consultant shall comply with and be bound by the provisions of Labor Code Sections 1774 and 1775 concerning the payment of prevailing rates of wages to workers and the penalties for failure to pay prevailing wages. The Consultant shall, as a penalty to City, forfeit $200.00 for each calendar day, or portion thereof, for each worker paid less than the prevailing rates as determined by the DIR for the work or craft in which the worker is employed for any public work done pursuant to this Agreement by Consultant or by any subconsultant.

7. Consultant shall comply with and be bound by the provisions of Labor Code Section 1776, which requires Consultant and each subconsultant to: keep accurate Professional Services Agreement
FCG CONSULTANTS, INC.

Page 18 of 19 ends

payroll records and verify such records in writing under penalty of perjury, as specified in Section 1776; certify and make such payroll records available for inspection as provided by Section 1776; and inform City of the location of the records.

8. Consultant shall comply with and be bound by the provisions of Labor Code seq. concerning the employment of apprentices on public works projects. Consultant shall be responsible for compliance with these aforementioned Sections for all apprenticeable occupations. Prior to commencing work under this Agreement, Consultant shall provide City with a copy of the information submitted to any applicable apprenticeship program. Within 60 days after concluding work pursuant to this Agreement, Consultant and each of its subconsultants shall submit to City a verified statement of the journeyman and apprentice hours performed under this Agreement.

9. The Consultant shall not perform Work with any Subconsultant that has been debarred or suspended pursuant to California Labor Code Section 1777.1 or any other federal or state law providing for the debarment of consultants from public works. The Consultant and Subconsultants shall not be debarred or suspended throughout the duration of this Contract pursuant to Labor Code Section 1777.1 or any other federal or state law providing for the debarment of consultants from public works. If the Consultant or any subconsultant becomes debarred or suspended during the duration of the project, the Consultant shall immediately notify City.

10. Consultant acknowledges that eight hours labor constitutes a legal day’s work. Consultant shall comply with and be bound by Labor Code Section 1810.

Consultant shall comply with and be bound by the provisions of Labor Code Section 1813 concerning penalties for workers who work excess hours. The Consultant shall, as a penalty to City, forfeit $25.00 for each worker employed in the performance of this Agreement by the Consultant or by any subconsultant for each calendar day during which such worker is required or permitted to work more than eight hours in any one calendar day and 40 hours in any one calendar week in violation of the provisions of Division 2, Part 7, Chapter 1, Article 3 of the Labor Code. Pursuant to Labor Code section 1815, work performed by employees of Consultant in excess of eight hours per day, and 40 hours during any one week shall be permitted upon public work upon compensation for all hours worked in excess of eight hours per day at not less than one and one-half times the basic rate of pay.

11. California Labor Code Sections 1860 and 3700 provide that every employer will be required to secure the payment of compensation to its employees. In accordance with the provisions of California Labor Code Section 1861, Consultant hereby certifies as follows:
“I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract.” Professional Services Agreement
FCG CONSULTANTS, INC.

Page 19 of 19 ends

12. For every subconsultant who will perform work on the project, Consultant shall be responsible for such subconsultant’s compliance with Chapter 1 and Labor Code Sections 1860 and 3700, and Consultant shall include in the written contract between it and each subconsultant a copy of those statutory provisions and a requirement that each subconsultant shall comply with those statutory provisions.

Consultant shall be required to take all actions necessary to enforce such contractual provisions and ensure subconsultant’s compliance, including without limitation, conducting a periodic review of the certified payroll records of the subconsultant and upon becoming aware of the failure of the subconsultant to pay his or her workers the specified prevailing rate of wages. Consultant shall diligently take corrective action to halt or rectify any failure.

13. To the maximum extent permitted by law, Consultant shall indemnify, hold harmless and defend (at Consultant’s expense with counsel reasonably acceptable to City) City, its officials, officers, employees, agents and independent consultants serving in the role of City officials, and volunteers from and against any demand or claim for damages, compensation, fines, penalties or other amounts arising out of or incidental to any acts or omissions listed above by any person or entity (including Consultant, its subconsultants, and each of their officials, officers, employees and agents) in connection with any work undertaken or in connection with the Agreement, including without limitation the payment of all consequential damages, attorneys’ fees, and other related costs and expenses. All duties of Consultant under this Section shall survive the termination of the Agreement.

AGREEMENT NO. _______

PROFESSIONAL SERVICES AGREEMENT

BETWEEN THE CITY OF PICO RIVERA AND

FOUNTAINHEAD CONSULTING CORPORATION

1. IDENTIFICATION
THIS PROFESSIONAL SERVICES AGREEMENT (“Agreement”) is entered into by and between the City of Pico Rivera, a California municipal corporation (“City”) and Fountainhead Consulting Corporation, (“Consultant”). City and Consultant are sometimes hereinafter individually referred to as a “Party” and collectively referred to as “Parties.”

2. RECITALS

2.1 City has determined that it requires professional services from a consultant to provide on-call construction management services.

2.2 Consultant represents that it is fully qualified to perform such professional services by virtue of its experience and the training, education and expertise of its principals and employees. Consultant further represents that it is willing to accept responsibility for performing such services in accordance with the terms and conditions set forth in this Agreement.

NOW, THEREFORE, for and in consideration of the performance by the Parties of the mutual covenants and conditions herein contained, the Parties hereto agree as follows:

3. DEFINITIONS

3.1 “Scope of Services”: Such professional services as are set forth in the Consultant’s February 7, 2024 proposal to City attached hereto as Exhibit “A” and incorporated herein by this reference.

3.2 “Approved Fee Schedule”: Such compensation rates as are set forth in the Consultant’s February 7, 2024 proposal to City attached hereto as Exhibit “B.”

3.3 “Commencement Date” : March 26, 2024

3.4 “Expiration Date” : June 30, 2029

4. TERM
The term of this Agreement shall commence at 12:00 a.m. on the Commencement Date and shall expire at 11:59 p.m. on the Expiration Date unless extended by written agreement of the Parties or terminated in accordance with Section 22 below.

Enclosure 1
9c
Professional Services Agreement

FOUNTAINHEAD CONSULTING CORPORATION

Page 2 of 19 ends

5. CONSULTANT’S SERVICES

5.1 Consultant shall perform the services identified in the Scope of Services. City shall have the right to request, in writing, changes in the Scope of Services. Any such changes mutually agreed upon by the Parties, and any corresponding increase or decrease in compensation, shall be incorporated by written amendment to this Agreement. In no event shall the total compensation and costs payable to Consultant under this Agreement exceed the sum of $2,500,000, Two Million Five Hundred Thousand Dollars, unless specifically approved in advance, in writing, by City.

5.2 Consultant shall perform all work to the highest professional standards of Consultant’s profession and in a manner reasonably satisfactory to City.

6. COMPENSATION

6.1 City agrees to compensate Consultant for the services provided under this Agreement, and Consultant agrees to accept in full satisfaction for such services, payment in accordance with the Approved Fee Schedule.

6.2 Consultant shall submit to City an invoice, on a monthly basis or less frequently, for the services performed pursuant to this Agreement. Each invoice shall itemize the services rendered during the billing period and the amount due. Within ten (10) business days of receipt of each invoice, City shall notify Consultant in writing of any disputed amounts included on the invoice. Within thirty (30) calendar days of receipt of each invoice, City shall pay all undisputed amounts included on the invoice. City shall not withhold applicable taxes or other authorized deductions from payments made to Consultant.

6.3 Payments for any services requested in writing by City and not included in the Scope of Services shall be made to Consultant by City on a time-and-materials basis using Consultant’s standard fee schedule. Fees for such additional services shall be paid within sixty (60) days of the date Consultant issues an invoice to City for such services.

7. BUSINESS LICENSE
Consultant shall obtain a City of Pico Rivera business license prior to commencing performance under this Agreement.

8. COMPLIANCE WITH LAWS
Consultant shall keep informed of State, Federal and Local laws, ordinances, codes and regulations that in any manner affect those employed by it or in any way affect the performance of its services pursuant to this Agreement. Consultant shall at all times comply with such laws, ordinances, codes and regulations. Without limiting the generality Professional Services Agreement

FOUNTAINHEAD CONSULTING CORPORATION

Page 3 of 19 ends

of the foregoing, if Consultant is an out-of-state corporation or LLC, it must be qualified and registered to do business in the State of California pursuant to sections 2105 and 17708.02 of the California Corporations Code. The City, its officers and employees shall not be liable at law or in equity occasioned by failure of Consultant to comply with this Section.

9. CONFLICT OF INTEREST
Consultant covenants that it presently has no interest and shall not acquire any interest, direct or indirect, which may be affected by the services to be performed by Consultant under this Agreement, or which would conflict in any manner with the performance of its services hereunder. During the term of this Agreement, Consultant shall not perform any work for another person or entity for whom Consultant was not working at the Commencement Date of this Agreement if both: (i) such work would require Consultant to abstain from a decision under this Agreement pursuant to a conflict of interest statute; and (ii) City has not consented in writing prior to Consultant’s performance of such work.

10. PERSONNEL
Consultant represents that it has, or will secure at its own expense, all personnel required to perform the services identified in the Scope of Services. All such services shall be performed by Consultant or under its supervision, and all personnel engaged in the work shall be qualified to perform such services. Consultant reserves the right to determine the assignment of its own employees to the performance of Consultant’s services under this Agreement, but City reserves the right, for good cause, to require Consultant to exclude any employee from performing services on City’s premises.

Zouheir Saleh, Project Manager, shall be Consultant’s project administrator and shall have direct responsibility for management of Consultant’s performance under this Agreement. No change shall be made to Consultant’s project administrator without City’s prior written consent.

11. OWNERSHIP OF WRITTEN PRODUCTS
All reports, documents or other written material (“written products”) developed by Consultant in the performance of this Agreement shall be and remain the property of City without restriction or limitation upon its use or dissemination by City. Consultant may take and retain copies of such written products as desired, but no such written products shall be the subject of a copyright application by Consultant. If any state, federal, or local law requires mandatory copyright protection for Consultant’s work product, City shall comply with such laws to the extent feasible.

12. INDEPENDENT CONSULTANT
Professional Services Agreement

FOUNTAINHEAD CONSULTING CORPORATION

Page 4 of 19 ends

12.1 Consultant is, and shall at all times remain as to City, a wholly independent consultant. Consultant shall have no power to incur any debt, obligation, or liability on behalf of City or otherwise to act on behalf of City as an agent. Neither City nor any of its officers, employees or agents shall have control over the conduct of Consultant or any of Consultant’s employees, except as set forth in this Agreement. Consultant shall not at any time represent that it is, or that any of its agents or employees are, in any manner employees of City. 12.2 The Parties further acknowledge and agree that nothing in this Agreement shall create or be construed to create a partnership, joint venture, employment relationship, joint-employer relationship, or any other relationship between Consultant or Consultant’s employees except as set forth in this Agreement.

12.2 City shall have no direct or indirect control over Consultant’s employees or sub-consultants with respect to wages, hours, and working conditions. In addition, City shall not deduct from the Compensation paid to Consultant any sums required for Social Security, withholding taxes, FICA, state disability insurance or any other federal, state or local tax or charge which may or may not be in effect or hereinafter enacted or required as a charge or withholding on the compensation paid to Consultant, Consultant’s employees or subconsultants. City shall have no responsibility to provide Consultant, its employees or subconsultants with workers’ compensation insurance or any other insurance.

13. CONFIDENTIALITY
All data, documents, discussion, or other information developed or received by Consultant or provided for performance of this Agreement are deemed confidential and shall not be disclosed by Consultant without prior written consent by City. City shall grant such consent if disclosure is legally required. Upon request, all City data and any copies thereof shall be returned to City upon the termination or expiration of this Agreement.

14. NON-LIABILITY OF CITY OFFICIALS AND EMPLOYEES
No official or employee of the City shall be personally liable to Consultant in the event of any default or breach by City, or for any amount which may become due to Consultant.

15. INDEMNIFICATION

15.1 The Parties agree that City, its officers, agents, elected and appointed officials, employees, affiliated public agencies and volunteers should, to the extent permitted by law, be fully protected from any loss, injury, damage, claim, lawsuit, cost, expense, attorneys’ fees, litigation costs, or any other cost arising out of or in any way related to the performance of this Agreement. Accordingly, the provisions of this indemnity provision are intended by the Parties to be interpreted and construed to provide the fullest protection possible under the law to City. Consultant acknowledges that City would not enter into this Agreement in the absence of Consultant’s commitment to indemnify and Professional Services Agreement

FOUNTAINHEAD CONSULTING CORPORATION

Page 5 of 19 ends

protect City as set forth herein. Notwithstanding the foregoing, to the extent Consultant's services are subject to Civil Code Section 2782.8, the above indemnity shall be limited, to the extent required by Civil Code Section 2782.8, to claims that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant.

15.2 To the full extent permitted by law, Consultant shall indemnify, hold harmless and defend City, its officers, agents, elected and appointed officials, employees, affiliated public agencies and volunteers from and against any and all claims, demands, lawsuits, causes of action, losses, costs or expenses for any damage due to death or injury to any person and injury to any property resulting from or arising out of any alleged intentional, reckless, negligent, or otherwise wrongful acts, errors or omissions of Consultant or any of its officers, employees, servants, agents, or subconsultants in the performance of this Agreement. Such costs and expenses shall include reasonable attorneys’ fees incurred by counsel of City’s choice and expert witness fees and consultant fees. Notwithstanding the foregoing, to the extent Consultant's Services are subject to Civil Code Section 2782.8, the above indemnity shall be limited, to the extent required by Civil Code Section 2782.8, to claims that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant.

15.3 City shall have the right to offset against the amount of any compensation due Consultant under this Agreement any amount due to City from Consultant as a result of Consultant’s failure to pay City promptly any indemnification arising under this Section 15 or related to Consultant’s failure to either: (i) pay taxes on amounts received pursuant to this Agreement or (ii) comply with applicable workers’ compensation laws.

15.4 The obligations of Consultant under this Section 15 will not be limited by the provisions of any workers’ compensation act or similar act. Consultant expressly waives its statutory immunity under such statutes or laws as to City, its officers, agents, employees and volunteers.

15.5 Consultant agrees to obtain executed indemnity agreements with provisions identical to those set forth here in this Section 15 from each and every subconsultant or any other person or entity involved by, for, with or on behalf of Consultant in the performance of this Agreement. In the event Consultant fails to obtain such indemnity obligations from others as required herein, Consultant agrees to be fully responsible and indemnify, hold harmless and defend City, its officers, agents, elected and appointed officials, employees, affiliated public agencies and volunteers from and against any and all claims, demands, lawsuits, causes of action, losses, costs or expenses for any damage due to death or injury to any person and injury to any property resulting from or arising out of any alleged intentional, reckless, negligent, or otherwise wrongful acts, errors or omissions of Consultant’s subconsultants or any other person or entity involved by, for, with or on behalf of Consultant in the performance of this Agreement. Such costs Professional Services Agreement

FOUNTAINHEAD CONSULTING CORPORATION

Page 6 of 19 ends

and expenses shall include reasonable attorneys’ fees incurred by counsel of City’s choice and expert witness fees and consultant fees.

15.6 City does not, and shall not, waive any rights that it may possess against Consultant because of the acceptance by City, or the deposit with City, of any insurance policy or certificate required pursuant to this Agreement. This hold harmless and indemnification provision shall apply regardless of whether or not any insurance policies are determined to be applicable to the claim, demand, damage, liability, loss, cost or expense.

15.7 PERS ELIGIBILITY INDEMNITY. In the event that Consultant or any employee, agent, or subconsultant of Consultant providing services under this Agreement claims or is determined by a court of competent jurisdiction or the California Public Employees Retirement System (PERS) to be eligible for enrollment in PERS as an employee of the City, Consultant shall indemnify, defend, and hold harmless City for the payment of any employee and/or employer contributions for PERS benefits on behalf of Consultant or its employees, agents, or subconsultants, as well as for the payment of any penalties and interest on such contributions, which would otherwise be the responsibility of City.

Notwithstanding any other agency, state or federal policy, rule, regulation, law or ordinance to the contrary, Consultant and any of its employees, agents, and subconsultants providing service under this Agreement shall not qualify for or become entitled to, and hereby agree to waive any claims to, any compensation, benefit, or any incident of employment by City, including but not limited to eligibility to enroll in PERS as an employee of City and entitlement to any contribution to be paid by City for employer contribution and/or employee contributions for PERS benefits.

16. INSURANCE

16.1 During the term of this Agreement, Consultant shall carry, maintain, and keep in full force and effect insurance against claims for death or injuries to persons or damages to property that may arise from or in connection with Consultant’s performance of this Agreement. Such insurance shall be of the types and in the amounts as set forth below:

16.1.1 Comprehensive general liability, and Umbrella or Excess Liability Insurance covering all operations by or on behalf of Consultant providing insurance for bodily injury liability and property damage liability for the following and including coverage for:

16.1.1.1 Premises, operations, and mobile equipment

16.1.1.2 Products and completed operations
Professional Services Agreement

FOUNTAINHEAD CONSULTING CORPORATION

Page 7 of 19 ends

16.1.1.3 Broad form property damage (including completed operations)

16.1.1.4 Explosion, collapse, and underground hazards

16.1.1.5 Personal Injury

16.1.1.6 Contractual liability
in the amount of One Million Dollars ($1,000,000) per occurrence combined single limit; Two Million Dollars ($2,000,000) aggregate for products/completed operation; Two Million Dollars ($2,000,000) general aggregate (General aggregate must apply separately to Consultant’s work under this Agreement.); and Five Million Dollars ($5,000,000) umbrella or excess liability.

16.1.2 Automobile Liability Insurance for owned, hired and non-owned vehicles utilized by Consultant, its employees or subconsultants, in the amount of One Million Dollars ($1,000,000) per accident for bodily injury and property damage.

16.1.3 Worker’s Compensation Insurance as required by the laws of the State of California, with Statutory Limits, and Employer's Liability Insurance with limit of no less than One Million Dollars ($1,000,000) per accident for bodily injury or disease.

16.1.4 Professional Liability Insurance against errors and omissions in the performance of the work under this Agreement with coverage limits of not less than One Million Dollars ($1,000,000) per occurrence of claim/ Two Million Dollars ($2,000,000) in the aggregate.

16.2 Consultant shall require each of its subconsultants, if any, to maintain insurance coverage that meets all of the requirements of this Agreement.

16.3 The policy or policies required by this Agreement shall be issued by an insurer admitted in the State of California and with a rating of at least A:VII in the latest edition of Best’s Insurance Guide.

16.4 Consultant agrees that if it does not keep the aforesaid insurance in full force and effect City may either: (i) immediately terminate this Agreement; or (ii) take out the necessary insurance and pay, at Consultant’s expense, the premium thereon.

16.5 At all times during the term of this Agreement, Consultant shall maintain on file with City’s Risk Manager a certificate or certificates of insurance showing that the aforesaid policies are in effect in the required amounts and, for the general liability and automobile liability policies, naming the City as an additional insured. Consultant shall, prior to commencement of work under this Agreement, file with City’s Risk Manager such Professional Services Agreement

FOUNTAINHEAD CONSULTING CORPORATION

Page 8 of 19 ends

certificate(s).

16.6 Consultant shall provide proof that policies of insurance required herein expiring during the term of this Agreement have been renewed or replaced with other policies providing at least the same coverage. Consultant shall provide such proof to City at least two weeks prior to the expiration of the coverages.

16.7 The general liability and automobile policies of insurance required by this Agreement shall contain an endorsement naming City, its officers, employees, agents and volunteers as additional insureds. All of the policies required under this Agreement shall contain an endorsement providing that the policies cannot be canceled or reduced except on thirty days’ prior written notice to City. Consultant agrees to require its insurer to modify the certificates of insurance to delete any exculpatory wording stating that failure of the insurer to mail written notice of cancellation imposes no obligation, and to delete the word “endeavor” with regard to any notice provisions.

16.8 The general liability and automobile policies of insurance provided by Consultant shall be primary to any coverage available to City. Any insurance or selfinsurance maintained by City, its officers, employees, agents or volunteers, shall be in excess of Consultant’s insurance and shall not contribute with it.

16.9 All insurance coverage provided pursuant to this Agreement shall not prohibit Consultant, and Consultant’s employees, agents or subconsultants, from waiving the right of subrogation prior to a loss. Consultant hereby waives all rights of subrogation against the City.

16.10 Any deductibles or self-insured retentions must be declared to and approved by the City. At the option of City, Consultant shall either reduce or eliminate the deductibles or self-insured retentions with respect to City, or Consultant shall procure a bond guaranteeing payment of losses and expenses.

16.11 Procurement of insurance by Consultant shall not be construed as a limitation of Consultant’s liability or as full performance of Consultant’s duties to indemnify, hold harmless and defend under Section 15 of this Agreement.

16.12 If Consultant maintains broader coverage and/or higher limits than the minimums shown above, the City requires and shall be entitled to the broader coverage and/or the higher limits maintained by the Consultant. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City.

17. MUTUAL COOPERATION

17.1 City shall provide Consultant with all pertinent data, documents and other requested information as is reasonably available to City for the proper performance of Consultant’s services under this Agreement.

Professional Services Agreement

FOUNTAINHEAD CONSULTING CORPORATION

Page 9 of 19 ends

17.2 In the event any claim or action is brought against City relating to Consultant’s performance in connection with this Agreement, Consultant shall render any reasonable assistance that City may require.

18. RECORDS AND INSPECTIONS
Consultant shall maintain full and accurate records with respect to all matters covered under this Agreement for a period of three years after the expiration or termination of this Agreement. City shall have the right to access and examine such records, without charge, during normal business hours. City shall further have the right to audit such records, to make transcripts therefrom and to inspect all program data, documents, proceedings, and activities.

19. PERMITS AND APPROVALS
Consultant shall obtain, at its sole cost and expense, all permits and regulatory approvals necessary in the performance of this Agreement. This includes, but shall not be limited to, encroachment permits and building and safety permits and inspections.

20.NOTICES
Any notices, bills, invoices, or reports required by this Agreement shall be deemed received on: (i) the day of delivery if delivered by hand, facsimile, email, or overnight courier service during Consultant’s and City’s regular business hours; or (ii) on the third business day following deposit in the United States mail if delivered by mail, postage prepaid, to the addresses listed below (or to such other addresses as the Parties may, from time to time, designate in writing).

If to City: If to Consultant:

Steve Carmona, City Manager
City of Pico Rivera
PO Box 1016
6615 Passons Blvd.

Pico Rivera, California 90660-1016
Ivan Benavidez, Director
Fountainhead Consulting
Corporation
7950 Cherry Ave, Suite 103
Fontana, CA 92336
With a courtesy copy to:

Arnold M. Alvarez-Glasman, City Attorney
13181 Crossroads Parkway North
Suite 400 - West Tower
City of Industry, CA 91746
Professional Services Agreement

FOUNTAINHEAD CONSULTING CORPORATION

Page 10 of 19 ends

21. SURVIVING COVENANTS
The Parties agree that the covenants contained in Sections 13, 15 and Paragraph

17.2 of Section 17, of this Agreement shall survive the expiration or termination of this Agreement.

22. TERMINATION

22.1 City shall have the right to terminate this Agreement for any reason on five (5) calendar days’ written notice to Consultant. Consultant shall have the right to terminate this Agreement for any reason on sixty (60) calendar days’ written notice to City. The effective date of termination shall be upon the date specified in the notice of termination.

Consultant agrees that in the event of such termination, City’s obligation to pay Consultant shall be limited to payment only for those services satisfactorily rendered, as solely determined by the City, prior to the effective date of termination. Consultant agrees to cease all work under this Agreement on or before the effective date of any notice of termination. All City data, documents, objects, materials or other tangible things shall be returned to City upon the termination or expiration of this Agreement.

22.2 If City terminates this Agreement due to no fault or failure of performance by Consultant, then Consultant shall be paid based on the work satisfactorily performed, as solely determined by the City, at the time of termination. In no event shall Consultant be entitled to receive more than the amount that would be paid to Consultant for the full performance of the services required by this Agreement.

23. ASSIGNMENT
Consultant shall not delegate, transfer, subcontract or assign its duties or rights hereunder, either in whole or in part, without City’s prior written consent, and any attempt to do so shall be void and of no effect. City shall not be obligated or liable under this Agreement to any Party other than Consultant.

24. NON-DISCRIMINATION AND EQUAL EMPLOYMENT OPPORTUNITY

24.1 In the performance of this Agreement, Consultant shall not discriminate against any employee, subconsultant, or employment applicant because of race, color, creed, religion, sex, marital status, national origin, ancestry, age, physical or mental handicap, medical condition or sexual orientation. Consultant will take affirmative action to ensure that subconsultants, employees, and employment applicants are treated without regard to their race, color, creed, religion, sex, marital status, national origin, ancestry, age, physical or mental handicap, medical condition or sexual orientation.

24.2 Consultant will, in all solicitations or advertisements for employees placed by or on behalf of Consultant state either that it is an equal opportunity employer or that all qualified applicants will receive consideration for employment without regard to race, Professional Services Agreement

FOUNTAINHEAD CONSULTING CORPORATION

Page 11 of 19 ends

color, creed, religion, sex, marital status, national origin, ancestry, age, physical or mental handicap, medical condition or sexual orientation.

24.3 Consultant will cause the foregoing provisions to be inserted in all subcontracts for any work covered by this Agreement except contracts or subcontracts for standard commercial supplies or raw materials.

25. WARRANTIES

25.1 Each Party has received independent legal advice from its attorneys with respect to the advisability of entering into and executing this Agreement, or been provided with an opportunity to receive independent legal advice and has freely and voluntarily waived and relinquished the right to do so. Each Party who has not obtained independent counsel acknowledges that the failure to have independent legal counsel will not excuse such Party’s failure to perform under this Agreement.

25.2 In executing this Agreement, each Party has carefully read this Agreement, knows the contents thereof, and has relied solely on the statements expressly set forth herein and has placed no reliance whatsoever on any statement, representation, or promise of any other party, or any other person or entity, not expressly set forth herein, nor upon the failure of any other party or any other person or entity to make any statement, representation or disclosure of any matter whatsoever.

25.3 It is agreed that each Party has the full right and authority to enter into this Agreement, and that the person executing this Agreement on behalf of either Party has the full right and authority to fully commit and bind such Party to the provisions of this Agreement.

26. CAPTIONS

26.1 The captions appearing at the commencement of the sections hereof, and in any paragraph thereof, are descriptive only and for convenience in reference to this Agreement. Should there be any conflict between such heading, and the section or paragraph thereof at the head of which it appears, the section or paragraph thereof, as the case may be, and not such heading, shall control and govern in the construction of this Agreement.

26.2 Masculine or feminine pronouns shall be substituted for the neuter form and vice versa, and the plural shall be substituted for the singular form and vice versa, in any place or places herein in which the context requires such substitution(s).

Professional Services Agreement

FOUNTAINHEAD CONSULTING CORPORATION

Page 12 of 19 ends

27. NON-WAIVER

27.1 The waiver by City or Consultant of any breach of any term, covenant or condition herein contained shall not be deemed to be a waiver of such term, covenant or condition or of any subsequent breach of the same or any other term, covenant or condition herein contained. In no event shall the making by City of any payment to Consultant constitute or be construed as a waiver by City of any breach of covenant, or any default which may then exist on the part of Consultant, and the making of any such payment by City shall in no way impair or prejudice any right or remedy available to City with regard to such breach or default. No term, covenant or condition of this Agreement shall be deemed to have been waived by City or Consultant unless in writing.

27.2 Each right, power and remedy provided for herein or now or hereafter existing at law, in equity, by statute, or otherwise shall be cumulative and shall be in addition to every other right, power, or remedy provided for herein or now or hereafter existing at law, in equity, by statute, or otherwise. The exercise, the commencement of the exercise, or the forbearance of the exercise by any Party of any one or more of such rights, powers or remedies shall not preclude the simultaneous or later exercise by such Party of any of all of such other rights, powers or remedies.

27.3 Consultant shall not be liable for any failure to perform if Consultant presents acceptable evidence, in City’s sole judgment, that such failure was due to causes beyond the control and without the fault or negligence of Consultant.

28. COURT COSTS AND ATTORNEY FEES
In the event legal action shall be necessary to enforce any term, covenant or condition herein contained, the Party prevailing in such action, whether reduced to judgment or not, shall be entitled to its reasonable court costs, including accountants’ fees and expert witness fees, if any, and attorneys’ fees expended in such action. The venue for any litigation shall be Los Angeles County, California.

29. SEVERABILITY
If any term or provision of this Agreement or the application thereof to any person or circumstance shall, to any extent, be invalid or unenforceable, then such term or provision shall be amended to, and solely to, the extent necessary to cure such invalidity or unenforceability, and in its amended form shall be enforceable. In such event, the remainder of this Agreement, or the application of such term or provision to persons or circumstances other than those as to which it is held invalid or unenforceable, shall not be affected thereby, and each term and provision of this Agreement shall be valid and be enforced to the fullest extent permitted by law.

Professional Services Agreement

FOUNTAINHEAD CONSULTING CORPORATION

Page 13 of 19 ends

30. GOVERNING LAW
This Agreement shall be governed and construed in accordance with the laws of the State of California.

31. COUNTERPARTS
This Agreement may be signed in any one or more counterparts all of which taken together shall be but one and the same Agreement. Any signed copy of this Agreement or of any other document or agreement referred to herein, or copy or counterpart thereof, delivered by facsimile or email transmission, shall for all purposes be treated as if it were delivered containing an original manual signature of the Party whose signature appears in the facsimile or email and shall be binding upon such Party in the same manner as though an originally signed copy had been delivered.

32. ENTIRE AGREEMENT
All documents referenced as exhibits in this Agreement are hereby incorporated in this Agreement. In the event of any material discrepancy between the express provisions of this Agreement and the provisions of any document incorporated herein by reference, the provisions of this Agreement shall prevail. This instrument contains the entire Agreement between City and Consultant with respect to the transactions contemplated herein. No other prior oral or written agreements are binding upon the Parties.

Amendments hereto or deviations herefrom shall be effective and binding only if made in writing and executed by City and Consultant.
[This space is intentionally left blank]
Professional Services Agreement

FOUNTAINHEAD CONSULTING CORPORATION

Page 14 of 19 ends

TO EFFECTUATE THIS AGREEMENT, the Parties have caused their duly authorized representatives to execute this Agreement on the dates set forth below. “CITY” “CONSULTANT”

CITY OF PICO RIVERA FOUNTAINHEAD CONSULTING

CORPORATION
______________________________ ___________________________________ Andrew C. Lara, Mayor Ivan Benavidez, Director
Dated: ________________________ Dated: _____________________________ ATTEST: APPROVED AS TO FORM:
___________________________ ___________________________________ Cynthia Ayala, City Clerk Arnold M. Alvarez-Glasman, City Attorney Professional Services Agreement

FOUNTAINHEAD CONSULTING CORPORATION

Page 15 of 19 ends

EXHIBIT A

SCOPE OF SERVICES
Proposal. for
City of Pico Rivera
On-Call Construction Management and
Inspection Services
RFP No. PR-RFP-036
February 7, 2024
7950 Cherry Avenue I Suite 1031 Fontana, California 9233'6 0: 909.346.0005 I www.founta·nheadcorp.com
7950 Cherry Avenue, Suite 103 | Fontana, California 92336 | 909.730.4913 | www.fountainheadcorp.com February 7, 2024
Noe Negrete, P.E.

Director of Public Works
City of Pico Rivera
6615 Passons Blvd
Pico Rivera, CA 90670-3658
Subject: PROPOSAL FOR ON-CALL CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES (PR-RFP-036) Dear Mr. Negrete,
Fountainhead Consulting Corporation (Fountainhead) is pleased to submit our proposal for On-Call Construction Management and Inspection Services. Fountainhead is a California Corporation and is a leading provider of core services specializing in project management, construction management, construction and specialty inspection, project controls / CPM Scheduling, document control and labor compliance, and public relations / community outreach services. We have organized our proposal to be responsive to each of the items requested in the Request for Proposal.

Fountainhead understands that this is an on-call contract for construction management and inspection services that may include but are not limited to roadway pavement rehabilitation and/or restoration, streetscape, landscaping and irrigation systems, utility, bridges, safety lighting, traffic signal, water treatment and distribution systems, sewer systems, flood control and storm drain facilities, parks and community centers, and facilities.

Fountainhead has assembled its team to be not only
responsive to the construction management and inspection services requirements, but we are committing our very best resources to support the City of Pico Rivera in delivering your projects on time and within budget. In fact, the proposed team members have worked on various Pico Rivera projects under our current contract:

Fountainhead will provide the City of Pico Rivera with technical innovations, superior project knowledge, coupled with a responsive and experienced staff. Additionally, we will provide well-tuned construction management processes for successful project oversight, completion, and documentation. Together—under the leadership of the City of Pico Rivera and our staff, a strong and well integrated “Construction Management Team” is created.

Fountainhead Previous Pico Rivera Experience Proposal Team Members • Rosemead Blvd. Rehab (CIP 50041)
• Pavement Rehab Overlay (CIP 50048)
• Olympic Blvd and Pico Vista Road Water
Improvements (Project CIP 21360)
Zouheir Saleh, PE – Project Manager / Construction
Manager
Cesar Cerda – Construction Inspector
Armando Salazar – Construction Inspector
Kevin Austin, PE – Construction Inspector
Nicole Salem – Labor Compliance / Document Control

FOUNTAINHEAD CONSULTING CORPORATION
Tax ID: 46-4231774-
Contact Person: Ivan Benavidez, PE
Title: Project Director
Address: 7950 Cherry Avenue
Suite 103
Fontana, CA 92336
Phone: 909.512.2815
Our team will be led by Ivan Benavidez, PE, QSD/QSP, Project Director. Ivan has more than 28 years of extensive experience as a project manager, resident engineer, construction and program manager on sewer / storm drainage improvements, parks, trails, streets, roadways, electrical / lighting improvements, and drainage improvements projects. Ivan’s experience includes Rancho Mission Viejo Development of the new City of Rancho Mission Viejo for the past ten years including such buildings as Fire Station 67 and various new roadways, highways and bridges. His experience also includes various projects for the Orange County Public Works, County of Los Angeles, County of Ventura, Cities of Ontario, Anaheim, Newport Beach, and Rialto, in addition to various transportation agencies such as Caltrans District 7, 8, 11, 12 and 59, Orange County Transportation Authority, to name a few.

Our Project Manager / Construction Manager, Zouheir Saleh, PE, CCM project experience includes but is not limited to the City of Fontana’s Fontana Park & Jessie Turner Community Center, Ontario International Airport Authority’s multiple projects, City of Rialto Building 200 and 300 Renovation and Improvements, City of Rialto’s Fire Station 20, City of Los Angeles’ Fire Station 21; Metrolink Parking Structure, City of Orange / OCTA’s Metrolink Parking Structure and RCTD’s Clay Grade Separation in the City of Jurupa. In addition, Zouheir’s experience includes various streets and roadways for the Counties of Los Angeles, San Bernardino, and Imperial and various Cities including Pico Rivera, Rialto, Fontana, Glendale, Camarillo, and Carson to name just a few.

Our team includes the following subconsultants:

The Fountainhead team brings unparalleled construction management services to the City of Pico Rivera. Our key strengths for this particular procurement contract include:
• Commitment to safety and security
• Seasoned staff with relevant PM/CM and inspection experience • Collaborative team approach coupled with strong working relationships • Proven track record of successfully providing staff augmentation • Track record of effectively managing contractors
• Experience coordinating with stakeholders
• Effective project procedures and proven local, state, and federal documentation expertise.

I acknowledge receipt of Addendum 1 issued January 3, 2024 and responses to Questions dated January 31, 2024 and have incorporated Addendum 1 in our proposal.

Fountainhead’s proposal will remain valid for a period of 90 calendar days from the date of submittal.

I am authorized to bind Fountainhead Consulting Corporation to the terms of the RFP and attest that all information submitted with the Proposal is true and correct. If you have any questions or need any additional information, please contact Zouheir Saleh, PE, Project / Construction Manager at 310.738.3719 or at [email protected].

Very truly yours,
Ivan Benavidez, Jr.

Director
Subconsultant Name / Address Contact Information Services to Provide RMA Group
122130 Santa Margarita Court
Rancho Cucamonga, CA 91730
Slawek Dymerski, President
909.989.1751
[email protected]
Material Testing
ZT Consulting Group, Inc.
1041 East Green Street, No 204
Pasadena, CA 91786
Farzad Tasbihgoo, PhD, PE, CQA, CWI
Principal Engineer
818.929.8162 | [email protected]
Source Inspection
Attn: Noe Negrete, Director of Public Works, City of Pico Rivera On-Call Construction Management and Inspection Services (PR-RFP-036)

Page 2 ends

Page | 2

CITY OF PICO RIVERA
On-Call Construction Management and
Inspection Services
(PR-RFP-036)

TABLE OF CONTENTS
A. Letter of Offer............................................................................................................................................. 1 Table of Contents (Not Part of the Page Count)
B. Qualifications of the Firm.......................................................................................................................... 3 Company Profile .................................................................................................................................. 3 Firm’s Financial Condition ................................................................................................................... 3 Working Relationship With Subconsultants ......................................................................................... 4 Firm’s Strength & Stability ................................................................................................................... 4 Key Staff’s Current Assignments & Availability.................................................................................... 4 Similar Project Experience................................................................................................................... 5 C. Proposed Staffing ...................................................................................................................................... 6 Organizational Chart............................................................................................................................ 6 Staff Capabilities, Qualifications & Experience Matrix ......................................................................... 7 Resumes (Not Part of the Page Count)............................................................................................. 9 D. Consultants and/or Sub-Consultants..................................................................................................... 31 E. Work Approach......................................................................................................................................... 32 Project Understanding ....................................................................................................................... 32 Project Approach ............................................................................................................................... 32 Project Management Plan ................................................................................................................. 34 Mobilization Plan ............................................................................................................................... 35 Scope of Services.............................................................................................................................. 35 Scope of Services Flow Chart ........................................................................................................... 42 Quality Assurance / Quality Control Procedures................................................................................ 43 F. Client References ..................................................................................................................................... 44 G. Rights to Materials................................................................................................................................... 49 H. Schedule of Hourly Rates........................................................................................................................ 49 Fountainhead Fee Schedule.............................................................................................................. 49 RMA Group (Subconsultant – Materials Testing) .............................................................................. 50 ZT Consulting Group (Subconsultant – Source Inspection)............................................................... 52 Appendix ................................................................................................................................................. 53 Non-Collusion Affidavit (Not Part of the Page Count)...................................................................... 53 i
Qualifications of the Firm
Page | 3

CITY OF PICO RIVERA
On-Call Construction Management and
Inspection Services
(PR-RFP-036)
B. QUALIFICATIONS OF THE FIRM
Company Profile
Fountainhead Consulting Corporation (Fountainhead) is a leading provider of core services specializing in project management, construction management, construction inspection, specialty inspection (electrical, utility coordination, landscape, welding, SWPPP), project controls, CPM Scheduling, claims mitigation, document control, labor compliance, contract administration and coordination services.

Fountainhead offers more than 10 years of experience in public works and construction projects, including, but not limited to, transportation / infrastructure, interchanges, roadway construction; street rehabilitations, bridge widenings, soundwalls / retaining walls, grade separations, water / waste water, sewer and drainage improvements, facilities, utilities, safety lighting, traffic signal, utilities coordination, parks and community centers, landscaping, streetscape, commercial / retail developments. In addition, we provide our services for utility infrastructure, drainage structures; pump stations; municipal and commercial buildings; and electrical receiving and distributing stations for both public and private sector projects. Fountainhead’s complete array of services provide our partners and clients with cost effective and efficient services and solutions to their projects covering all aspects and phases from pre-construction, construction to post-construction.

Firm’s Financial Condition
Fountainhead is in good financial condition with no bankruptcy, pending litigation, or outstanding claims for or against the firm. There is no planned office closures or mergers that would impede Fountainhead’s ability to provide On-Call engineering and professional consulting services.

SERVICES PROJECTS
— Construction Management
— Program Management
— Project Management
— Construction Inspection
— Staff Augmentation
— Project Controls
— CPM Scheduling
— Claims Analysis
— Design-Build Support
— Development Assistance
— Document Control
— Labor Compliance
— Staff Augmentation
— Utility Coordination
— Contract Administration
— Roadway Rehab
— Streets Improvements
— Bridges / Interchanges
— Freeways and Highways
— Rail and Transit Facilities
— Structures and Bridges
— Grade Separations
— Storm Drainage Structures
— Utilities and Infrastructure
— Storm Drains / Sewer / Drainage
— Water Wastewater
— Parks and Community Centers
— Commercial / Retail Buildings
— Lighting, Stripping & Signage
— Landscape / Streetscape
Year Founded: 2013
Form of Organization: Corporation
Number of Employees: 72
Corporate Address
7950 Cherry Avenue, Suite 103
Fontana, California 92336
Local Office
445 South Figueroa Street
Suite 3100
Los Angeles, California 90071
Contact Information
Zouheir Saleh, PE, CCM
Project Manager
O: 909.730.4913|
C: 310.738.3719
[email protected]
FOUNTAINHEAD’S CLIENTS INCLUDE
• City of Pico Rivers | City of Whittier
• City of Glendale | City of Carson
• City of Glendale | City of Placentia
• City of Yorba Linda
• City of Irvine | City of Anaheim
• City of Indio | City of Camarillo
• City of San Bernardino
• City of Moreno Valley
• City of Fontana | City of Menifee
• City of Rialto | City of Riverside
• City of San Bernardino
• County of Los Angeles
• County of San Bernardino
• County of Riverside
• Ontario International Airport
Authority (OIAA)
• Caltrans Districts 7, 8, 11 & 12
• Orange County Transpiration
Authority (OCTA)
• Riverside County Transportation
Department (RCTD)
• City, County & Port 38of San Diego
Page | 4

CITY OF PICO RIVERA
On-Call Construction Management and
Inspection Services
(PR-RFP-036)
Working Relationships With Subconsultants
Fountainhead has included the following subconsultants, RMA Group for Materials Testing Services and ZT Group, Inc. for Source Inspection. Fountainhead has worked with both RMA and ZT on various projects including but not limited to the following:

Project Prime Consultant Subconsultant / Role
City of Rialto, On-Call Inspection Services Fountainhead RMA – Materials Testing Services City of South Gate, Garfield Avenue Rehab Fountainhead RMA – Materials Testing Services City of Whittier, Metro Hot Spots Whittier Blvd. Fountainhead RMA – Materials Testing Services Inyo County North Round Valley Road Bridge Fountainhead ZT – Source Inspection City of La Canada Flintridge – I-210 Soundwall Fountainhead ZT – Source Inspection City of Whittier, Metro Hot Spots Whittier Blvd. Fountainhead ZT – Source Inspection Firm’s Strength and Stability
Fountainhead is financially stable, and our strong financial performance is a testament to our stability. We have experienced significant growth and strong financial performance over the last ten years; and have the financial wherewithal to withstand any downward economic pressures and finish the project regardless of the state of the larger economy. Fountainhead is a multi-divisional corporation serving clients at the federal, state, local, and private levels. Our financial strength is derived from strict adherence to best practices, risk management, and regulatory compliance. Fountainhead’s current staffing capability is strong, stable with adequate availability to support Pico Rivera’s On-Call projects. Fountainhead currently has over 70 full-time and part-time inspectors working on various on-call construction inspection projects.

Key Staff’s Current Assignments and Availability
Below is a list of our proposed key staff current assignments and availability for the City of Pico Rivera.

Key Staff Member Role Current Assignment Availability
Zouheir Saleh, PE PM / CM City of Pico Rivera, On-Call 100% Arezo Ghiam, PE Assistant PM / CM Caltrans District 12, On-Call Inspection 100% Javier Soto, PE CM / RE City of Yorba Linda, 2022-2023 Annual Pavement Preservation 100%
Aycan Kara Construction Inspector Caltrans District 7, On-Call Inspection 100% Richard Hennings Construction Inspector Caltrans District 12, On-Call Inspection 100% Cesar Cerda Construction Inspector City of Placentia, On-Call Inspection 100% Armando Salazar Construction Inspector Caltrans District 8, On-Call Inspection 100% Gabriel Flores Electrical Inspector Caltrans District 7 On-Call Electrical 100% Kevin Austin, PE SWPPP Compliance City of Rialto, Riverside and Other Roads 100%
Chetan Shah, PE CPM Scheduling / Claims
Mitigation LA Metro, I-5 Enhancement 50%
Nicole Salem Document Control / Labor
Compliance LA Metro, I-5 Enhancement 100%
Page | 5

CITY OF PICO RIVERA
On-Call Construction Management and
Inspection Services
(PR-RFP-036)
Similar Project Experience
Similar projects completed on schedule, includes but not limited to the following:

TYPE OF

PROJECT PROJECT NAME
Roadways
• Rosemead Blvd. Rehab (CIP 50041)
• Pavement Rehab (CIP 50048)
• Olympic Blvd and Pico Vista Rd Water Improvements (Project CIP 21360) • Etiwanda Corridor Improvements
• La Colonia Independencia Remedial Repair & Overlay
• Hospital & Hook Creek Roadway Repairs
• Orange Park Acres Pavement Maintenance
• SR-210 Soundwalls Phase III
• ADA Upgrades - Anaheim Islands Los Patronis
• Olive Heights Pavement Maintenance
• Ladera Ranch, Midway City & Rossmoor Pavement Maintenance Bridges
• El Rovia Ditch Bridge Emergency Repairs
• Brea Blvd. Bridges
• Crown Valley Pkwy Bridge
• Santiago Canyon Road Bridge
• Silverado Canyon Road Bridge
• Antonio Parkway Bridge
• Rehabilitation of Bridges Over Santa Ana River Phase I • Segerstrom Ave. Bridge Over Santa Ana River
Flood Control
• Water Main Replacement (CIP 21360)
• Santa Ana-Santa Fe Channel Rehabilitation
• Santiago Creek Channel Restoration
• Collins Channel Rehabilitation
• O'Neill Retarding Basin
• Barranca Channel Restoration Project
• Los Alamito Channel Rehabilitation
• Red Hill Channel Rehabilitation
• Bitterbush Channel Rehabilitation
• Greenville Banning Channel and Bitterbush Channel
• Oso Creek Channel/San Juan Creek Channel Rehab
• Prima Deshecha Canada Channel (MO1) Maintenance & Remediation Labor Compliance
• Arrowhead Regional Medical Center Labor & Delivery
• County of San Bernardino Board Chambers
• Live Oak Road
• Santiago Canyon Road Safety Improvements
• OC Loop Segment H El Cajon Bikeway
Parks & Community
Centers
• Frisbee Park (North & South)
• Bud Bender Park
• Margaret Todd Basketball Court
• Cactus Trail Improvements
• Rialto Community Center (Buildings 200 & 300)
• Parque Del Arroyo Verde Renovation Project 7902
Proposed Staffing
Page | 6

CITY OF PICO RIVERA
On-Call Construction Management and
Inspection Services
(PR-RFP-036)
C. PROPOSED STAFFING
Below is Fountainhead’s proposal organizational chart and communication plan.

Key Personnel will be available to the extent proposed for the duration of the PSA and no person assigned to a project shall be removed or replaced without the prior written concurrence of the City of Pico Rivera.

Page | 7

CITY OF PICO RIVERA
On-Call Construction Management and
Inspection Services
(PR-RFP-036)
Staff Capabilities, Qualifications & Experience Matrix
Below is a list of our proposed staff and their qualifications. The list also includes our staff availability percentage for this On-Call contract.

Staff, Capabilities, Qualifications & Experience Matrix Our team brings demonstrated
experience in successful
execution of capital improvement
projects. All our staff have
experience successfully
delivering various types of
projects through various project
delivery process.

Personnel / Role
Professional
Registration
Certification Education
Years of ExperienceProject Director Project ManagerConstruction Manager / Resident Eng.Public Works / Construction InspectionStreet / Roadway Paving / RehabParks & Playground RenovationsFacilities / Building ImprovementsCurbs / Gutters / Ramps / ADA RampsTraffic Signal Mod. / Electrical InspectionSafety ImprovementsStormwater and Drainage FacilitiesSWPPP Compliance / InspectionLandscape Architect / InspectionWelding Inspection / Materials Testing / Source InspProject Controls / CPM SchedulingLabor Compliance / Community Outreach Ivan Benavidez, PE, QSD/P
Project Director
CA, Civil Eng.

No. 52076
MS, Civil Eng.

BS, Civil Eng. 28 X X X X X X X X X X X X X X
Zouheir Saleh, PE, QSD/P
Project / Construction Manager
CA, Civil Eng.

No. 42881 BS, Civil Eng. 35 X X X X X X X X X X X X X
Arezo Ghiam, PE, QSD
Assist. PM / CM
CA, Civil Eng.

No. 86359 BS, Civil Eng. 12 X X X X X X X X X X X X X X Javier Soto, PE, QSD/P
Construction Manager / RE / SR
CA, Civil Eng.

No. 56938
MS, Civil Eng.

BS, Civil Eng. 30 X X X X X X X X X X X X X
Tyrone Taylor, PE, QSD
Construction Manager / RE / SR
CA, Civil Eng.

No. 66867 BS, Civil Eng. 22 X X X X X X X X X X X X X
Javid Sharifi, PE, QSD
Construction Manager / RE / SR.

CA, Civil Eng.

No. 60926
MS, Civil Eng.

BS, Civil Eng. 25 X X X X X X X X X X X X X
Fred Alipanah, PE, QSD/P
Construction Manager / RE / SR
CA, Civil Eng.

No. 64521 BS, Civil Eng. 30 X X X X X X X X X X X X X
Aycan Kara, EIT
Construction Inspector

CA, EIT
No. 176428
MS, Civil Eng.

BS, Civil Eng. 10 X X X X X X X X X X X
Cesar Cerda
Construction Inspector
Electrical
Coursework 30 X X X X X X X X X X
Nael Al-Salah
Construction Inspector BS, Civil Eng. 8 X X X X X X X X X X Qais Abassy
Construction Inspector BS, Civil Eng. 5 X X X X X X X X X X James Uriarte
Construction Inspector
MBA
BS, Const. Mgmt. 12 X X X X X X X X X X
Richard Hennings, EIT
Construction Inspector

CA, EIT
No. 141463 BS, Civil Eng. 30 X X X X X X X X X X
Armando Salazar
Construction Inspector
NASSC, Curedin-Place PipeCaltrans RE
Academy 30 X X X X X X X X X X
Jessica Harvey, PE
Construction Inspector
CA, Civil Eng.

No. 92007 BS, Civil Eng. 12 X X X X X X X X X X X X
Page | 8

CITY OF PICO RIVERA
On-Call Construction Management and
Inspection Services
(PR-RFP-036)
Staff, Capabilities, Qualifications & Experience Matrix Our team brings demonstrated
experience in successful
execution of capital improvement
projects. All our staff have
experience successfully
delivering various types of
projects through various project
delivery process.

Personnel / Role
Professional
Registration
Certification Education
Years of ExperienceProject Director Project ManagerConstruction Manager / Resident Eng.Public Works / Construction InspectionStreet / Roadway Paving / RehabParks & Playground RenovationsFacilities / Building ImprovementsCurbs / Gutters / Ramps / ADA RampsTraffic Signal Mod. / Electrical InspectionSafety ImprovementsStormwater and Drainage FacilitiesSWPPP Compliance / InspectionLandscape Architect / InspectionWelding Inspection / Materials Testing / Source InspProject Controls / CPM SchedulingLabor Compliance / Community Outreach Badih Moussa
Construction Inspector
MS, Civil Eng.

BS, Civil Eng. 6 X X X X X X X X X X X
Qays Aljumaah
Construction Inspector BS, Civil Eng. 27 X X X X X X X X X X Gabriel Flores
Electrical Inspector
Electrician
No. C6680587 Coursework 30 X X X X X X X X X X
Jesse Marez
Electrical Inspector
NABCEP
Certified
BS, Electrical
Engineering 27 X X X X X X X X X X
Jesse Vargas
Electrical Inspector
Electrician
No. E110368G
Electrical
Engineering 22 X X X X X X X X X X
Richard Shirley, RLA, QSD
Landscape Inspector
CA, Landscape
Arch. No. 2252
BS, Landscape
Architect 30 X X X X X X X X X X
Kevin Austin, PE
SWPPP Compliance / Inspector
CA, Civil Eng.

No. 83422 BS, Civil Eng. 12 X X X X X X X X X X
Mark Milleron, AWA, CWI
Welding Inspector AWS, CWI Welding Coursework 24 X X X X X X X X X X X Chetan Shah, PE
Project Controls / CPM Scheduling /
Claims
CA, Civil Eng.

No. 58226
MBA
MS/BS, Civil Eng. 30 X X
Alberto Martinez
CPM Scheduler
MBA
BA, Admin. 15 X
Nicole Salem
OE / Doc. Control / Labor Compl.

MBA
BS, Const. Eng. 17 X
Shayna Knowles, EIT
OE / Doc. Control / Labor Compl.

CA, EIT
No. 173209 BS, Civil Eng. 7 X
Claudia Mejia
Community Outreach / PR BA, Marketing 15 X
Johnny Rodriguez, PE
Materials Testing Principal Engineer
CA, Civil Eng.

No. 93236 BS, Civil Eng. 7 X
Brandon Buffalo
Materials Testing

ICC, ACI,
Nuclear Gauge 20 X
Farzad , Tasbihgoo, PhD, PE,CWI
Source Inspection
CA, Civil Eng.

No. 71403
PhD / MS Struct.

BS, Civil Eng. 21 X
Key Staff – Brief resumes of our proposed key staff members follow.

Page | 9

CITY OF PICO RIVERA
On-Call Construction Management and
Inspection Services
(PR-RFP-036)

ZOUHEIR SALEH, PE, CCM, QSD/P
Project Manager / Construction Manager

EDUCATION
BS, Civil Engineering, Trine
University, IN

REGISTRATION
CA, Professional Civil
Engineer, No. 42884
Qualified SWPPP Developer
/ Practitioner
CA, Construction Contract
Manager Certified
Zouheir has more than 35 years of project management, construction management and staff/client development experience, including his work for Caltrans Division of Engineering Services. He has a strong background in construction and project management of small to large and complex projects, on local streets and roadways, state highways, interchanges, and freeways.

He is an expert in the construction of bridges, retaining walls, deep foundation, MSE walls, culverts and bridge demolition.

Zouheir has extensive experience with administering contracts, working with diverse staff, monitoring and providing training and guidance. Zouheir has worked on all aspects of construction and brings expertise in contract documentation, processing change orders, resolving conflicts, coordination with designers and resolves all field issues.

Zouheir has led all aspects of contract administration including staffing; meeting with contracts and agencies; monitoring construction budget and schedules, partnering; as well as conducting value analysis and constructability review of project plans and specifications for errors and omissions. He has served as Resident Engineer Academy instructor and provided workshops on Team Building, CIDH pile construction and Seismic Retrofitting. He has been trained as a Dispute Review Board (DRB) member, is familiar with DRB preparation and processes. Zouheir is experienced in constructability review, value engineering, and has supervised a large staff of engineers and personnel, and always leads by example.

RELEVANT EXPERIENCE
City of Pico Rivera, Rosemead Boulevard Roadway Rehabilitation Project No. 50041, Pico Rivera, CA Construction Manager responsible for construction and inspection services for the Rosemead Boulevard Roadway Rehabilitation Project, CIP No. 50041 (Project). The Project will provide improvements on Rosemead Boulevard, between Whittier Boulevard and Gallatin Road. The scope of work includes pavement resurfacing, AC pavement grind and overlay, remove and reconstruct AC pavement, PCC Improvements, adjustment of utility valves, vaults and manholes, replacement of damaged curb and gutter, replacement of sidewalk, ADA access ramp improvements, traffic signage and striping, and trench remediation on Paramount Blvd. 240 feet northeast of Mines Avenue. Project Cost: $1.2 Million.

City of Pico Rivera, Street Pavement at Various Locations (CIP No. 50048), Pico Rivera, CA Project Manager responsible for construction inspection services for various projects including roadway embankments, grade checking using survey stakes, hot mixed asphalt (HMA), PCC paving, city’s annual resurfacing, sidewalk and curb and gutter construction. Scope of work includes pavement resurfacing, AC pavement grind and overlay, remove and reconstruct AC pavement, PCC Improvements, cold mill existing AC pavement, replacement of sidewalk, ADA access ramp improvements, construct residential driveways, traffic signage and striping. Project Cost: Various.

City of Pico Rivera, Olympic Blvd & Pico Vista Road Water Improvements (CIP No. 21360), Pico Rivera, CA Project Manager. Work involved installation of 15-inch, 18-inch, and 22-inch PVC and HDPE sewer pipeline and manholes. The work also included reconnection into all of the existing gravity mains and service laterals. This project required high degree of coordination with many agencies in addition to number of challenges, working within an active and high traffic areas.

Page | 10

CITY OF PICO RIVERA
On-Call Construction Management and
Inspection Services
(PR-RFP-036)
Zouheir Saleh, PE, CCM, QSD/P

Page 2 ends

City of Camarillo, Road Improvements – Sidewalk and Gutter Improvements (Project No. ST-5047), Camarillo, CA Project Manager. Work included replacing sidewalk, curb and gutter, driveways, asphalt grind and overlay, traffic overlays, traffic signs, storm drain facilities, access ramps, tree removal, traffic loops, pavement striping, traffic loop detectors, and related work. Project Cost: $0.6 Million.

City of Camarillo, Annual Resurfacing Services (Project Nos. ST-5020 & ST-5021), Camarillo, CA Project Manager. The project consisted of PCC improvements, AC point repairs, weed spraying, crack sealing, Asphalt Rubber Aggregate Membrane (ARAM) chip seal, slurry seal, traffic control, striping and related work. The work also included Digouts, concrete improvements, weed spraying, crack sealing, ARAM chip seal, slurry seal, pavement delineation and markers, traffic control and utility adjustment.

Project Cost: $2.3 Million.

County of Ventura, Lockwood Valley Road Pavement Resurfacing (East & West), Ventura, CA Project Manager for construction of two pavement resurfacing projects located in the Lockwood Valley area. The first project number is No. 50599 is pavement resurfacing and involved asphalt concrete hot mix (ACHM) Overlay, 1.5” thick, on Asphalt- Rubber Aggregate Membrane (ARAM). The project includes the east half of Lockwood Valley Road, about 10 miles long, from Kern County line to Grade Valley Road, and Boy Scout Camp Road, 3 miles long. The second project, No. 50612 is also a resurfacing project. It involved ACHM Overlay on ARAM, and included Lockwood Valley Road, West. Project Cost: $7.2 M.

County of Los Angeles Public Works Department, On-Call Construction Engineering and Construction Inspection Services, Los Angeles, CA
Consultant Contract Manager. Zouheir was engaged as the Lead for two contracts with the County of Los Angeles. The services provided consisted of providing resumes upon request and furnishing qualified personnel within seven days of notification to perform construction inspection in support of various road, flood control, landscaping, bridge, water, sewer, and aviation construction-related projects, and permitted construction activities in public and flood control district. Project Cost: Various.

Los Angeles County Department of Public Works, Various Capital Improvement Projects, Los Angeles, CA Project Director. Responsible for managing construction inspection and resident engineering services on various projects. He was responsible for resident engineers, inspectors, office engineers, claims specialists, schedulers as well as quality control, claims management, public relations and coordination. In this role, he also oversaw staff providing specialty inspection services including electrical inspection, SWPPP compliance and office engineering who provided and processed all documentation required. Project Cost: Various.

City of Indio, As-Needed Construction Inspection & Labor Compliance Services, Indio, CA Project Manager responsible for construction inspection and Labor Compliance services for various projects.

Projects includes Jackson Street Traffic Signal Interconnect Improvements, Avenue 48 Improvements, and Jefferson Street Modifications. Services include asphalt concrete pavement, mill and resurfacing, AC dike, electrical work, coordinating with utility companies’, landscaping, irrigation, grading, traffic signals, street lights, water systems, sewer systems and traffic control for various projects.

Page | 11

CITY OF PICO RIVERA
On-Call Construction Management and
Inspection Services
(PR-RFP-036)

AREZO GHIAM, PE, QSD
Assistant Project Manager / Construction Manager
Mrs. Ghiam has 12 years’ experience in transportation construction projects with various public agencies where she performed contract administration, cost estimating, construction inspection, surveying, labor compliance, document control, bid preparation, and project closeout. More specifically she has been cross trained to perform construction management services as a resident engineer, inspector, office engineer, and principal assistant on roadway and structure construction projects. She has initiated project documentation controls, performed engineering administrative duties, coordinated material testing for roadway improvements, bridge widenings, retaining walls, sound walls, paving, traffic control, drainage, sewer and pipeline projects.

Arezo’s experience includes, but not limited to, field inspection daily reports and quantities take-offs, review and monitor schedule of work, enforcement of plans and specifications, review shop drawings and working drawings for shoring and falsework, review change orders, review submittals and assist with RFI’s, preparing and reviewing as-built plans, preparing final punch list, and project closeout documents. Furthermore, she has acted as a Resident Engineer and on behalf of the Structure Representative to coordinate RFI responses, review submittals, negotiate and process change orders. Arezo has extensive experience with Caltrans Standard Plans and Specifications, Caltrans Construction Manual, Caltrans Structures Manual, Caltrans Safety Manual, OSHA Safety Manual, Greenbook SSPWC, and APWA Standards.

RELEVANT EXPERIENCE
City of Whittier, State Highway 72 / Whittier Blvd. Widening, Whittier, CA Resident Engineer: Responsible for the widening of Whittier Blvd including roadway section, traffic signals, and ADA ramps with Caltrans oversite. Responsible for all aspects of contract administration including review of concrete mix designs and various shop drawings, quantity calculations, materials sampling and control, source inspection, assuring compliance with project plans and specifications, and Contract Change Orders.

Point of contact and coordination between Caltrans, City, and Developer. Project Cost $3 Million.

Rancho Mission Viejo Development/Orange County Public Works (OCPW), LPP Roadway Improvements / Repairs, Rancho Mission Viejo, CA
Resident Engineer: Responsible for all identifying and administering roadway improvements and repairs due to storm damage. Repairs included: v-ditch, trapezoidal channel, storm drain, curb & gutter, sidewalk, ADA ramp, AC paving, and basins. Performed quantity calculations and was the main point of contact between developer and OCPW. Project Cost $5 Million.

Rancho Mission Viejo Development, Los Patrones Parkway / Chiquita Canyon Drive, Rancho Mission Viejo, CA
Resident Engineer: Responsible for all aspects of contract administration including analyzing and approving structural support systems, shoring, concrete mix designs and various shop drawings, quantity calculations, materials sampling and control, public outreach, assuring compliance with project plans and specifications; identifying actual and potential problems associated with the construction project and recommending sound engineering solutions for structures; drainage systems; and utility relocation. Project Cost $22 Million.

EDUCATION
BS, Civil Engineering,
California State Polytechnic
University, Pomona

REGISTRATION
CA, Professional Civil Engineer
No. C86359
Page | 12

CITY OF PICO RIVERA
On-Call Construction Management and
Inspection Services
(PR-RFP-036)
Arezo Ghiam, PE, QSD

Page 2 ends

Orange County Transportation Authority (OCTA), Interstate 5 (I-5) HOV Improvement Project, San Juan Capistrano, CA
Lead Construction Inspector. Served as the main point-of-contact to verify structural integrity of multiple elements including bridges, retaining walls, and soundwalls. She was responsible for verifying compliance with relevant specifications, codes and regulations, ensuring monthly progress payments were accurate by performing quantity calculations, performed surveying of critical elements of the project, and managed and prepared contract change orders (CCO). Project Cost: $30 Million.

City of Riverside, Iowa Grade Separation, Riverside, CA Construction Inspector / Office Engineer. Prepared, tracked, and managed change orders; documented project issues and conditions, maintained organized and detailed records; and obtained permits. Project Cost: $24 Million.

City of Rialto, Cactus Pedestrian/Bike Trail Improvements Project, Rialto, CA Resident Engineer: Provided technical and contract administrative expertise to enforce contract plans and specifications. Prepared, tracked, and managed change orders; documented project issues and conditions, maintained organized and detailed records; and review the CPM schedule. Processed and checked the monthly progress payments and oversaw field construction inspection. Project Cost: $2 Million
City of Anaheim, Interstate 5 (I-5) and Gene Autry Way Project, Anaheim, CA Construction Inspector The project involved construction of a bridge extension of Gene Autry over the I-5 freeway; retaining walls; drainage systems; HMA paving; PCC paving and utility relocations. Arezo was responsible for construction inspection duties of both road and structure (bridge) works. Inspected soil conditions, depth of footings and observed the pouring of foundations, and ensured monthly progress payments were accurate by performing quantity calculations. Processed monthly invoices, attended project coordination meetings, oversaw contract change orders, and pay estimate units including monitoring project funding issues. Project Cost: $16 Million.

Orange County Public Works/Caltrans District 12, Gobernadora Canyon Overcrossing Bridge, Rancho Mission Viejo, CA
Assistant Resident Engineer. This project consists of a seven-span, 1,340-foot-long, cast-in-place/pre-stressed (CIP/PS) concrete box girder bridge with 2 abutments founded on 24-inch diameter CIDH piles and seven two 7-foot diameter column piers founded on 12-foot diameter CIDH piles. Arezo provided technical and administrative support to make certain the work complied with relevant engineering standards, codes, specifications and design instruction. Prepared, tracked, and managed change orders; documented project issues and conditions, maintained organized and detailed records; and obtained permits. Processed and checked the monthly progress payments and performed field construction inspection. quantity calculations; materials sampling and control; ensuring compliance with project plans and specifications; identifying actual and potential problems associated with the construction project and recommending sound engineering solutions for structures. Project Cost: $32 Million.

Page | 13

CITY OF PICO RIVERA
On-Call Construction Management and
Inspection Services
(PR-RFP-036)

JAVIER SOTO, PE, PMP, QSD/P
Construction Manager / Resident Engineer / Structure Representative

EDUCATION
BS Civil Engineering,
University of California,
Irvine, CA
MS, Civil Engineering,
University of California,
Irvine, CA

REGISTRATION
CA, Professional Civil
Engineer, No. C56938
Qualified Stormwater
Developer (QSD), No. 22301
Qualified Stormwater
Practitioner (QSP), No.
20899
Project Management
Professional (PMP), No.
1862750
Javier is a highly skilled public works engineer with over 30 years of experience in public works including over 15 years with design of roadway and bridges and over 10 years in construction as a Resident Engineer. Javier is well versed with both Greenbook and Caltrans Specifications and Standard Plans and has served as the Greenbook Surface Committee Chairman. He especially emphasizes the attention to quality control, project safety and NPDES requirements. His expertise includes AC and PCC paving, traffic control, roadway excavation, flood control, sewers, drainage, soils testing, steel inspection and major public works projects. Javier managed the horizontal Job Order Contract (JOC) program for the County of Orange for over 7 years with an annual project delivery of $40 million.

Javier has extensive knowledge working with eGordian in implementing new task bid items that incorporate our state (Caltrans)and local standards (Greenbook, County standards, etc.). He is also experienced in monitoring project status, contract expenditures, conducting meetings, communicating with contractors, and monitoring permit requirements of all the project agencies about environmental impacts and concerns. In addition, prepared and maintained project documents including labor and equipment records and labor compliance reports.

RELEVANT EXPERIENCE
City of Yorba Linda, FY 22/23 Annual Pavement Preservation Project, Yorba Linda CA Construction Manager. The project covers a large area (Zone 5 and 6B) of Yorba Linda consisting of residential streets, local collectors, and arterial roadways. The work on this project consists of cold milling, micro-milling, asphalt concrete overlay of over 50,000 tons, asphalt concrete dugouts, slurry seals, construction of over 200 curb ramps (Caltrans standard plan A88A / A88B), construction of curb and gutter, drainage system, manholes/valve covers adjust to grade, installation of 30 loop detectors, pavement striping/markings. Coordination with various utility companies relating to the adjustment to the grade of their utilities. Project Cost: $11 Million.

Caltrans District 7, On-Call Construction Engineering, Los Angeles, CA Lead Assistant Resident Engineer. Project included PN 0800000628; EA 08-368504: I-15 California Highway Patrol (CHP) Commercial Vehicle Enforcement Facility (CVEF), California-Nevada State Line; PN 0800020458; EA 0Q7604: I-10 Rehabilitation, from Los Angeles County Line to I-10/ SR 38 (PM 0.0/30.9).

Responsibilities included creating, updating and maintaining project submittal log and all other project specific quality control reports. Performed / supervised inspection of work in various disciplines as required.

Verified and documented that all materials received for the project are in conformance with the approved submittal, handled and stored appropriately and are acceptable for use in the project. Assisted in resolution of non-conformance reports and coordinate quality assurance program with contractors. Maintained the project "as-built" drawings daily. Project Cost: $47.8 Million.

Page | 14

CITY OF PICO RIVERA
On-Call Construction Management and
Inspection Services
(PR-RFP-036)
Javier Soto, PE, PMP, QSD/P

Page 2 ends

County of San Bernardino, Redwood Avenue and Other Roads Overlay, Rialto, CA Lead Construction Inspector overseeing a $3 million roadway overlay project within the unincorporated County area of San Bernardino adjacent to the City of Fontana . The project consisted of 4.7 miles of mill and overlay with 1.64 miles of GlassPave 50 interlayer, localized asphalt roadway edge repairs, reconstruction of AC Dikes, concrete sidewalk and curb & gutter repairs and striping. Provided preconstructions services such as a constructability review in verifying the bid quantities by conducting field measurements, reviewing project specifications to address outstanding items prior to start of work. Managed the QA Material Testing subconsultant contract and submitted/coordinated all materials testing for the project. Reviewed contractor submittals and RFI’s during the project and maintained an open line of communication with Contractor to address field issues and identify potential conflict issues or deficiencies to the appropriate parties. Provided onsite asphalt paving inspection, concrete pour inspection, asphalt dike placement and verified all work was completed in conformance with project plans and specifications.

Coordinate with the contractor foreman, construction crew staff, soils technicians, maintained daily activity logs and daily inspection reports including project photos, prepared quantity calculation sheets and monthly pay estimates, supported and promoted a safe work environment while complying with safety rules, maintained project files and records. Project Cost: $3 Million.

County of Orange Public Works Department, Antonio Parkway Grind and Overlay North and South in Unincorporate Ladera Ranch, Ladera Ranch, CA
Resident Engineer. JOC Project consisted of lowering the utilities (manholes, water valves, etc.) prior to grind, GlassPave 25 install prior to overlay, 2” grind and overlay with ARHM with rock dust blotter application prior to opening traffic to prevent tracking and tire adhesion delamination, and 2 coats of striping. Oversaw the project schedule, progress payments to contractor, Request For Information (RFI) submittals, project close out acceptance. Ensured proper traffic control, appropriate NPDES BMPs installed and maintained, reviewed Quality Assurance materials testing for compliance with project specifications. Project Cost: $3.3 Million.

County of Orange Public Works Department, Various Projects, Orange CA Construction Manager. The Construction Management Division consists of twenty-eight staff members; under my direction are resident engineers, inspectors and administrative staff. The Construction Management division provides construction inspection for roads, bridges, flood control channels and various public works facilities with an annual capital improvement project budget cost over $100 million. As the construction manager, my main function is to coordinate with the resident engineers to resolve any outstanding items that could not be reached with the contractor or stake holders. In addition, he review / approve Contract Change Orders for adherence to contract documents. Also, on a monthly basis, review / approve progress payments.

Page | 15

CITY OF PICO RIVERA
On-Call Construction Management and
Inspection Services
(PR-RFP-036)

AYCAN KARA, EIT
Construction Inspector
Ms. Kara has over 10 years of experience in transportation engineering and project management. She understands the inner workings of public work and private projects, experience in project management. She is knowledgeable of mechanically stabilized earth (MSE) walls, various types of retaining walls, soil nail walls, tie-back walls, roadway rehabilitation, new roadway construction, drainage, and sewer systems, and sound walls and retaining walls. Her responsibilities also include coordinating with discipline leads to schedule resources to ensure project schedule and budget are both met; driving the safety and quality culture of the project; scheduling work assignments; and coordinating design changes that are needed to allow stage construction that is needed for critical traffic switches.

Aycan’s responsibilities included construction inspection and Quality Control, daily reports and quantities take-offs, review and monitoring schedule of work, compliance with plans and specifications and certificates, shop drawings, change orders, submittals and RFIs, safety compliance, preparing and reviewing as-built plans, and preparing final punch list. She performs calculations (stress and deflection) of temporary structures in the construction of bridges (falsework, temporary shoring, working platforms, temporary supports). Aycan is also knowledgeable and experienced in the design and construction of temporary and permanent structures. Aycan reviews and analyzes critical path method (CPM) schedules, and monitors safety and quality assurance programs.

RELEVANT EXPERIENCE
City of Yorba Linda, FY 22/23 Annual Pavement Preservation Project, Yorba Linda CA Roadway Inspector. The project covers a large area(Zone 5 and 6B) of Yorba Linda consisting of residential streets, local collectors, and arterial roadways. The work on this project consists of cold milling, micro-milling, asphalt concrete overlay of over 50,000 tons, asphalt concrete dugouts, slurry seals, construction of over 200 curb ramps (Caltrans standard plan A88A / A88B), construction of curb and gutter, drainage system, manholes/valve covers adjust to grade, installation of 30 loop detectors, pavement striping/markings. Coordination with various utility companies relating to the adjustment to the grade of their utilities. Project Cost: $11 Million.

Caltrans District 7 (EA 07-2XC604, 2XE404, 2XE504, 2XF504, 2XF604 & 2XF704), On-Call Roadway Improvements, Ventura, CA
Assistant Resident Engineer. Completed multiple projects including construction of sidewalk, curb & gutter, ADA ramps, storm drains, manhole construction, traffic signals, street lighting, roadway construction, AC-HMA paving, and LCB/JPCP Pavement, roadway excavation, striping, drainage, underground utilities, and grade separations in compliance with Caltrans standards. Inspected Emergency projects on SR -33 & SR 150 with over 70 miles of roadway including grading, reconstruction of roadways on slope stabilized with geotextiles, rock slope protection, retaining walls, reconstruction of detention ponds, reconstruction of storm drains/pipes, ditches, reconstruction of MGS, paving, striping. Implemented water diversion plans in several riverbeds in compliance with environmental requirements. Filed Tentative Agreements daily basis and assisted with EWBs.

Project Cost: $47.8 Million.

EDUCATION
MS, Construction Engineering /
Management California State
University, Fullerton
MS, Civil Engineering, Anadolu
University, Eskisehir, Turkey
BS, Civil Engineer, Eskisehir
Osmangazi University, Eskisehir,
Turkey

LICENSE
CA, Engineer in Training,
No. 176428
Cal/OSHA 10-Hour: General
Construction Safety and Health,
No. 1220264342
Page | 16

CITY OF PICO RIVERA
On-Call Construction Management and
Inspection Services
(PR-RFP-036)
Aycan Kara, EIT

Page 2 ends

Caltrans District 12 (EA 12-19000036), Laguna Beach Roadway Improvements, Irvine, CA Assistant Resident Engineer. Responsible for implementing $10 million worth of Public Roadway Projects per plans, specifications, and special provisions in terms of managing, scheduling, and budgeting. The project consists of reconstructing of curb and gutter; ADA compliance sidewalk, driveway, and curb ramps; drainage system improvements including new inlets; traffic signal and electric improvements; cold mill & overlay combined with dugouts; and striping. Performed site inspection duties, performing safety checks of the field personnel and construction tools and equipment. Submitting RFIs, Submittal, Change Orders, Coordinate LCS Closures, Inspection & Survey Requests. In addition, preparing daily construction visits to record daily/monthly construction reports & photos, and SWPPP inspections.

Project Cost: $10 Million.

City of Rialto, Cactus Trail Improvements, City Project No. 170801, Rialto, CA Construction Inspector responsible for inspection of the new bicycle and pedestrian trail along the west side of Cactus Avenue between Rialto Avenue and Base Line Road in accordance with the City’s Circulation Element of the General Plan. The bicycle and pedestrian trail improvements included a new concrete path, signage, and landscaping. Right-of-way is existing for the proposed trail; the right-of-way exists within street dedicated rightof-way and Common Use Agreements with the San Bernardino County Flood Control and Water Conservation District. Project Cost: $1.5 Million.

City of Rialto, On-Call Construction Management, Inspection & Support Services, Rialto, CA Construction Inspector. Responsibilities included management of the multiple facets of environmental compliance, including stormwater pollution prevention, on several infrastructure projects including the Bud Bender Community Center Rehabilitation and Bud Bender Park Renovations. Responsible for various street paving, drainage, lighting, fencing, and landscaping. Responsible for grade checking, inspection of HMA pavement, removal and resurfacing, construction of concrete pavement, sidewalk, curb, curb & gutter, curb ramp, V-gutter, drainage and sewer system, soundwalls and retaining walls, grouted rock strip, landscaping, retaining wall, striping and verification of SWPPP implementation, traffic control, and safety. Duties required that he inspect various sites on an ongoing basis to produce compliance and corrective action reports, review and revise Storm Water Pollution Prevention Plans (SWPPPs) to correctly reflect site conditions and changes, coordinate correction of deficiencies, review and submit water quality monitoring and documents as required by the California State Water Resources Control Board Construction General Permit. Responsibilities included HMA paving excavation, grade checking, demolition of concrete pavement, curb & gutters, sidewalks, and removal of asphalt and concrete pavement. Project Cost: Various City of Rialto, Building 300 Inspection & Support Services, Rialto, CA Construction Inspector responsible for inspection of The Community Center Rehab located at 214 North Palm Avenue in Rialto involved the rehabilitation of Building 300’s Day Care Center. The work included renovation, ceiling, flooring, lighting, and windows replacement, movable partitions, and water bottle filling station for Building 300. It was determined that asbestos-containing materials (ACM) existed within the facility. Appropriate measures were required to remediate and dispose of the ACM, per Cal-OSHA and local NESHAPs (South Coast AQMD) regulations as well as other applicable local regulations. Project Cost: Various.

Page | 17

CITY OF PICO RIVERA
On-Call Construction Management and
Inspection Services
(PR-RFP-036)

CESAR CERDA
Construction Inspector
Mr. Cerda has more than 32 years of construction experience and is cross-trained in Civil and Electrical inspection work. He has worked as an assistant resident engineer, construction lead inspector, and General Superintendent for several large construction companies specializing in various fields including but not limited to highway widening and improvements, local road improvements, bridge widening and reconstruction, transmission pipeline construction and relocation, wastewater treatment facilities, commercial construction, and development construction. Cesar is responsible for RHMA, HMA and JPCP pavements, curb, gutters, sidewalk, grade checking, concrete pavement, curb ramp, V-gutter, drainage and sewer systems, grouted rock strip, landscaping, retaining wall, striping, signalization, SWPPP, traffic control, and safety. His field inspection experience also includes street lights, excavation, subgrades preparation, culverts, retaining walls, soil nail walls, sound walls, and concrete pour. He is experienced with traffic control system compliance, assists the resident engineer by preparing CCO and force account analysis.

Cesar’s responsibilities include construction inspection and Quality Control, daily reports and quantities takeoffs, review and monitor schedule of work, compliance with plans and specifications and certificates, shop drawings, change orders, submittals and RFI’s, safety compliance, preparing and reviewing as-built plans, and preparing final punch list. His duties include verifying that contractors and subcontractors work is in compliance with Standard Specifications and Special Provisions. Cesar’s duties include verifying that contractors and subcontractors work is in compliance with Standard Specifications and Special Provisions.

His responsibilities included construction inspection and Quality Control, daily reports and quantities takeoffs, review and monitor schedule of work, compliance with plans and specifications and certificates, shop drawings, change orders, submittals and RFI’s, safety compliance, preparing and reviewing as-built plans, and preparing final punch list. He has extensive knowledge and experience verifying electrical work is in compliance with local codes and NEC, NESC and ANSI standards.

RELEVANT EXPERIENCE
City of Pico Rivera, Street Pavement at Various Locations (CIP No. 50048), Pico Rivera, CA Construction Inspector responsible for construction inspection services for various projects including roadway embankments, grade checking using survey stakes, hot mixed asphalt (HMA), PCC paving, city’s annual resurfacing, sidewalk and curb and gutter construction. Scope of work includes pavement resurfacing, AC pavement grind and overlay, remove and reconstruct AC pavement, PCC Improvements, cold mill existing AC pavement, replacement of sidewalk, ADA access ramp improvements, construct residential driveways, traffic signage and striping.

Responsible for performing daily construction inspection to ensure contractor was building per contract plans and specifications, recorded details including Daily Inspection Reports accurately reflected construction progress, assisted with quantity estimates, change order process, marked as-built drawings of actual construction and site conditions, took progress photographs and logs, tracked schedules and maintained a good working relationship with the contractor and client. Project Cost: Various.

CERTIFICATIONS
IBEW Local Union 11
CalOSHA 10-Hour Certification
Traffic Signal and Street
Lighting Journeyman–Electrical
Training Trust National
Electrical Code–Electrical
Training Trust Conduit Bending–
Electrical Training Trust Storm
Water Pollution Prevention
Safety Course.

C3 Competent Person
Excavations course.

G2 Cal/OSHA Heat Illness
Prevention. C3 Competent
Person, Fall Protection
Page | 18

CITY OF PICO RIVERA
On-Call Construction Management and
Inspection Services
(PR-RFP-036)
Cesar Cerda

Page 2 ends

City of Placentia, On-Call Citywide Street Rehabilitation, Placentia, CA Construction Inspector. The project includes street improvements work along with signing and stripping at various City streets, and traffic signal upgrades at two intersections. Project also includes AC and PCC work such as AC grinding and overlay by ARHM/AC, AC Pavement reconstruction, PCC sidewalks, driveways, curb and gutter removal and replacement. Project also bus pads, existing sidewalk grinding, adjustment of utility structures, drainage structures, loop detectors placement, adjustment to traffic signal cameras, signing and striping, and pavement markings. Project Cost: $2 Million.

Caltrans District 8 (08A3068), I-10 Corridor Improvement Project, Montclair, CA Construction Inspector. Responsibilities include roadway widening and paving (HMA, PCCP), utility coordination and relocation, drainage systems, sewer, SWPPP, electrical, grading new ramps, frontage roads, traffic control traffic signals, traffic control, ADA compliance and requirements, lighting system, ramp metering system and safety inspection reviews with daily documentation of compliance in accordance with plans and specifications. Project Cost: $929 Million.

Caltrans District 8 (08A3068), On-Call Construction Inspection, I-15 from San Diego County to SR-91 Interchange, Riverside County, CA & I-10 Corridor Improvement Project, Montclair, CA Electrical Inspector / ARE. Project consists of 38 miles from the San Diego County border to one-mile North of the SR-91 Interchange. Project includes bridge demolition and construction, roadway widening, sound walls, retaining walls, MSE Walls, Cesar is responsible for performing electrical inspection, upgrading of service cabinets and controllers, installation of battery backup systems, new pedestrian heads and video detection systems and upgrading the traffic signal heads and luminaires to Light Emitting Diodes (LED). Work also includes coordination with contractor on all closures, traffic control, and all safety aspects. Project Cost: $929 Million.

City of Rialto, CDRE Holdings 11, LLC, PPD 2018-0021, Rialto, CA Construction Inspector responsible for a 99,999 square foot industrial warehouse building and associated paving, drainage, lighting, fencing, and landscaping on 4.63 gross acres of land (APNs: 0240-181-32 & -33) located on the north side of Base Line Road approximately 315 feet east of Palmetto Avenue within the Employment (EMP) zone of the Renaissance Specific Plan. He is also responsible for grade checking, inspection of construction of concrete pavement, sidewalk, curb, curb & gutter, curb ramp, V-gutter, drainage and sewer system, grouted rock strip, landscaping, retaining wall, striping and verification of SWPPP implementation.

San Bernardino County, Hook Creek Road & Hospital Road, Lake Arrowhead, CA Construction Inspector. The Work comprises of removing of asphalt concrete surfacing and base material; cold planning; placing leveling course, asphalt rubber seal coat, hot mix asphalt, asphalt concrete dike; construction of temporary road; traffic striping and marking; and other related work. Responsible for performing daily construction inspection to ensure contractor was building per contract plans and specifications, recorded details including Daily Inspection Reports accurately reflected construction progress, assisted with quantity estimates, change order process, marked as-built drawings of actual construction and site conditions, took progress photographs and logs, tracked schedules and maintained a good working relationship with the contractor and client. Project Cost: $2.5 Million.

City of Whittier, Nelles at the Grove in Whittier (WUA18-027), Whittier, CA Field Inspector. Responsibilities include field inspection of electrical, dry utilities, concrete structure, structural pavement, landscaping, irrigation, asphalt concrete, grading, traffic signals, street lights, water systems, sewer systems and traffic control, concrete drainage pools and overseeing testing. Perform field inspections and/or laboratory analysis for materials being used in construction transportation and public works projects. Project Cost: $42 Million.

Page | 19

CITY OF PICO RIVERA
On-Call Construction Management and
Inspection Services
(PR-RFP-036)

RICHARD HENNINGS
Construction Inspector
Mr. Hennings has over 12 years of experienced in managing Caltrans, Public Works construction projects. He has a proven track record of leading projects to completion om time and within budget.

His experience includes field inspection for concrete pavement, roadway excavation, trench excavation, culverts, gutter, asphalt surfacing, traffic control, and concrete pour for ADA Ramps. He verifies that contractors and sub-contractors work is in compliance with Standard Specifications and Special Provisions. He has also coordinated material testing, surveying, and utility installations. He has reviewed submittals and RFI’s, processed change order calculations and modifications to plans to optimize construction.

Attends weekly crew safety meeting and maintains good working relationships with government agencies, subcontractors and field personnel.

Richard has been involved with projects that were built to Caltrans standards. He is experienced in document control, computer software, analyses and modeling the project for constructability review. His effective communication skills enable him to promote cooperation between all project stakeholders. Software experience includes AutoCAD, Primavera P6, Bluebeam, Revu, Microsoft Office, Word, PowerPoint, Excel and Teams. He is familiar with Caltrans Standard Plans and Specifications, Caltrans Construction Manual, Greenbook Standards, and Safety requirements during construction activities. He has excellent written and verbal communication skills and has the ability to work independently and collaboratively.

RELEVANT EXPERIENCE
City of Rialto, Baseline Storm Drainage Project, Rialto, CA Construction Inspector: The project included upgrading the existing drainage infrastructure conditions within Baseline Avenue from Cactus Basin west to Tamarind Avenue. The project consists of installing an approximately 2-mile or 11,000 lineal feet storm drain system within Baseline Road that would capture flows north of Baseline Road. The storm drain line starts at the Tamarind Avenue / Baseline Road intersection and runs along Baseline Road to the outlet at Cactus Basin No. 3. The new storm drain will be developed within a reinforced concrete box that will vary in size between 6’ x 12’, 7’ x 7’, and 3’ x 10’ depending on the location within the new storm drain alignment. The majority of the storm drain footprint (located within Baseline Road) will be constructed as a 84” reinforced concrete pipe, though a portion of the easternmost section of the alignment, which encompasses the section from Baseline Road to Cactus Basin, will vary in size as either a 72”, 84”, 48”, 36”, or 30” RCP. Flows leaving Basin No. 3 continue on to Basin 1 and 2 and Rialto Channel, which ultimately discharges to the Santa Ana River. Outflow from the Cactus Basin System are limited due to the poor downstream channel capacities. Provided technical and contract administrative expertise to enforce contract plans and specifications. Prepared, tracked, and managed change orders; documented project issues and conditions, maintained organized and detailed records; and review the CPM schedule. Processed and checked the monthly progress payments and oversaw field construction inspection. Project Cost: Various.

EDUCATION
BS, Civil Engineering, California
State Polytechnic University,
Pomona

LICENSE
CA, CA, Fundamentals of
Engineering, No. 12-558-68
CA, Engineer in Training
No. 141463
Page | 20

CITY OF PICO RIVERA
On-Call Construction Management and
Inspection Services
(PR-RFP-036)
Richard Hennings, EIT

Page 2 ends

City of Irvine / Five Point, Irvine Blvd. Pedestrian Bridge, Irvine, CA Project Manager. Construction of pedestrian path and bridge at Irvine Blvd. and Ridge Valley. The project is a pedestrian / cycling bridge that spans Irvine Boulevard in Irvine, CA, uniting two family-oriented neighborhoods with an extensive park and trail system. While the City of Irvine created the bridge for safe pedestrian and bicycle passage from point to point, it is also a destination. The bridge provides a glowing beacon for its travelers at night, with strategically located lighting to illuminate the grand vertical gateways and guide walkers, runners, and bikers along the pathway. The Irvine Boulevard Pedestrian Bridge spans Irvine Boulevard and is on the easterly side of the Ridge Valley intersection. This is a streamlined, 4-span structural steel girder bridge with a cast-in-place, concrete slab deck pedestrian and bicycle path. The path is 11 feet wide and protected by a 4.5-foot high barrier. The bridge is 282 feet long and fully ADA compliant. ASCE 2016 Bridge Project of the Year.

Shea Homes, Alton Parkway Pedestrian Bridge, Lake Forest, CA Project Manager. Construction of pedestrian bridge over Alton Parkway for Baker Ranch. Responsibilities included assisting the Foreman, Designers, and Owners to coordinate all phases of the project. Reviewed and assembled submittals for review by Owner and Designers. Compiled and verified Change Order pricing that was submitted to the Owner for payment. Identify issues within the field and provide solutions to mitigate. If solutions required redesign or change in scope of work, a RFI was submitted into Owner for response. Actively ran weekly Owner meetings to provide updates with the project. Used scheduling programs to provide Owner with weekly and overall CPM schedules. Prepared Closeout documents such as as-builts and O&M Manuals.

City of Rialto, Riverside Avenue Central Reconstruction, Rialto, CA Construction Inspector for the $4 million Riverside Avenue project includes various side streets intersecting Riverside Avenue. The scope of construction spans approximately 6780 feet (1.28 miles). Project limits are Metro tracks to the North and San Bernardino Street on the South. The limits of the project are 0.6 miles north of Route 10 and 2.8 miles south of Route 210. Riverside Avenue consists of two lanes in each direction and a median. Responsibilities include roadway widening and paving (HMA, cold plane AC Pavement and traffic stripe tape), utility coordination and relocation, drainage systems, sewer, SWPPP, electrical, grading new ramps, frontage roads, traffic control traffic signals, traffic control, ADA compliance and requirements, lighting system, ramp metering system and safety inspection reviews with daily documentation of compliance in accordance with plans and specifications. Project Cost: $4 Million.

City of Rialto, Cactus Trail Improvements, Rialto, CA
Construction Inspector for the $2 million Cactus Trail Improvement Project. The project includes construction of a 1.49-mile long path that is 8-foot-wide for bicycle and 5-foot-wide for pedestrian use along the west side of Cactus Avenue between Rialto Ave and Baseline Road. The project also includes removal of the existing AC trail, PCC/AC driveway, and railroad tracks. New improvements include PCC sidewalk, PCC driveway, Three Rail PVC Fence, Asphalt Concrete, Decomposed Granite, Concrete Cutoff Wall, Cable Guard Rail, Yellow Detectable Warning Surface, 2” PVC Pipe for future landscaping, signing, and striping. Adjacent to the trail is the Rialto Channel, therefore coordination will be required with San Bernardino County Flood Control District (SBCFCD). Responsibilities include roadway widening and paving (HMA, cold plane AC Pavement and traffic stripe tape), utility coordination and relocation, drainage systems, sewer, SWPPP, electrical, grading new ramps, frontage roads, traffic control traffic signals, traffic control, ADA compliance and requirements, lighting system, ramp metering system and safety inspection reviews with daily documentation of compliance in accordance with plans and specifications. Project Cost: $2 Million.

Page | 21

CITY OF PICO RIVERA
On-Call Construction Management and
Inspection Services
(PR-RFP-036)

ARMANDO SALAZAR
Construction Inspector

EDUCATION
Caltrans Resident
Engineering Academy
Caltrans Office Engineer
Fire Direction Control Man
for Field Artillery with
Surveys Training
Rapid Set Concrete
Course
Rubberized Asphalt
Course
Concrete Paving Course
SWPPP Training
Confined Space Training
Course

CERTIFICATIONS
NASSCO, Cured-in-Place
Pipe, No. CIPP-0521-
401687
Caltrans Test Method: 105,
125, 201, 202, 216 217,
226, 227, 231, 504, 518,
523, 524, 533, 539, 540
Armando Salazar has 33 years of transportation, public works, and construction inspection. His experience includes roadways, foundations, paving, residential, commercial, and industrial projects. He is experienced with underground and above ground drainage, sewer and storm drain systems and structures, asphalt dikes and spillways. His areas of expertise include ARAM / JPCP / RSC / cold foam in place recycled paving, dikes, pile driving, SWPPP / WPCP, and electrical steel cage foundation. He has worked on transportation infrastructure projects for Caltrans, as well as projects for various counties and cities.

Additionally, Armando is experienced with field instrumentation procedures, aggregate, and soil sampling. His experience also includes field engineering on a variety of construction projects including roadway emergency repair, highway rehabilitation, capital improvement projects, sewer line improvements projects, landscape, irrigation systems, freeway, and street planting projects. These projects included; curb and gutter placement, cross gutter, spandrels, intersection grading and paving, driveway approaches and sidewalk widening per newest ADA guidelines, rapid set concrete for immediate access to business, adjusting various manholes and valves, pavement striping and re-striping according to various staging plans and parking lot construction with parking stalls, Portland Cement Concrete, Hot Mix Asphalt (HMA), , drainage, utilities, metal beam guard rail (MBGR), grinding, and earthwork. He understands the importance of working with residents and businesses and minimizing the impact of construction projects on their daily activities. He performed field inspections and/or laboratory analysis for materials being used in construction transportation and public works projects. He also performed plant inspections and made recommendations about materials, plant design, and operations.

RELEVANT EXPERIENCE
City of Pico Rivera, Olympic Blvd & Pico Vista Road Water Improvements (CIP No. 21360), Pico Rivera, CA Construction Inspector. Work involved installation of 15-inch, 18-inch, and 22-inch PVC and HDPE sewer pipeline and manholes. The work also included reconnection into all of the existing gravity mains and service laterals. This project required high degree of coordination with many agencies in addition to number of challenges, working within an active and high traffic areas.

City of Camarillo, Annual Resurfacing Project ST-5017, Camarillo, CA Construction / SWPPP Inspector responsible for construction inspection services various projects.

Responsibilities includes roadway embankments, grade checking using survey stakes, hot mixed asphalt (HMA), PCC paving. Duties include performing site inspections and reporting, Daily Dairies, project photos and coordination with the contractor.

City of Whittier, Sorensen Avenue Water Pipeline, Tract 72953, Whittier, CA Senior Field Inspector. Responsibilities include field inspection, traffic control, striping, electrical traffic signal synchronization, asphalt grinding, concrete drainage pools and overseeing testing. Performs field inspections and laboratory analysis for materials being used in construction transportation and public works projects. Cost: $4 M.

Page | 22

CITY OF PICO RIVERA
On-Call Construction Management and
Inspection Services
(PR-RFP-036)
Armando Salazar

Page 2 ends

City of Camarillo, Daily Drive, Project ST-5047, Camarillo, CA Construction Inspector responsible for construction inspection services various projects. Project included removal of existing asphalt, concrete curb, gutter, sidewalk and driveways, signs and posts, trees and stumps, catch basin and associated piping, and existing pull box. Project also included cold mill and overlay, construct of concrete curb, gutter, sidewalk, retaining curb and driveways, full depth pavement reconstruction, sewer manhole adjustment, ADA Curb ramps, remove and replace existing traffic loops, construction of drainage inlet with traffic rated grate, and overhead sign pole.

City of Whittier, Nelles at the Grove in Whittier (WUA18-027), Whittier, CA Construction Inspector. Responsibilities include field inspection of concrete structure, structural pavement, landscaping, irrigation, asphalt concrete, grading, traffic signals, street lights, water systems, sewer systems and traffic control, concrete drainage pools and overseeing testing. Project includes water quality compliance, sewer and storm drains systems and structures. Perform field and electrical inspections. The project includes demolition of the 68 buildings and new construction of 561 homes, 189 apartments and 150,000 square feet of retail and restaurant space. Four historic buildings are preserved. Project Cost: $42 Million.

Caltrans District 12, I-5 / Pacific Coast Highway Interchange / HOV Project, Dana Point, CA Field Inspector responsible for performing various duties involved in the day to day construction activities for the night shift. Including Field Inspection of Traffic Control, COZEEP Coordination, JPCP, CCO work, LCB, SWPPP, Street Sweeping, Striping, PCC Pavement, Lean Concrete Base, Clearing & Grubbing, earthwork.

Perform field inspections and/or laboratory analysis for materials being used in construction transportation and public works projects. Additionally, he was responsible for tracking cold plane item quantities and type C HMA placement tonnage, all dike removal and prepared pay quantities for Cad B input. Project Cost: $10 Million.

Caltrans District 8, Route 215 Realignment, Van Buren to D Street, Perris, CA Assistant Resident Engineer. Armando observed completed work performance to determine general compliance with plans, specifications, design criteria, and planning concepts. Additionally, he was responsible for tracking cold plane item quantities and type C HMA placement tonnage, all dike removal and prepared pay quantities for Cad B input. He prepared design changes for contract change orders and determined the safety of shoring false work and other temporary structures for realignment and widening of project. He computed pay quantities and prepared progress pay estimates. He also trained field procedures to personnel and oversee COZEEP. Project Cost: $70 Million.

Caltrans District 8, Route 10, Re-Surfacing, Colton / Fontana, CA Assistant Resident Engineer. Armando was responsible for administration and field inspection of grinding operation, daily lane closures, and striping. He prepared design changes for contract change orders and determined the safety of shoring false work and other temporary structures for realignment and widening of project. Additionally, he was responsible for tracking cold plane item quantities and type CHMA placement tonnage, all dike removal and prepared pay quantities for Cad B input. He computed pay quantities and prepared progress pay estimates. He also trained field procedures to personnel and oversee COZEEP.

Project Cost: $5 Million.

Page | 23

CITY OF PICO RIVERA
On-Call Construction Management and
Inspection Services
(PR-RFP-036)

GABRIEL FLORES
Electrical Inspector

EDUCATION
Electrical Training Institute
Certificate

CERTIFICATIONS
CA, Electrician, No.

C6680587
Mr. Flores is a Certified Electrician with 30 years + of experience. Areas of expertise include electrical inspection, construction inspection and quality assurance and quality control (QA/QC). He has delivered numerous projects, including roads and highways, bridges, airports, light rail, heavy rail, landscape, power distribution facilities, Port of Long Beach Electric Vehicle Charging Stations in conjunction with SCE oversight inspection. His experience includes traffic signal inspection, NEMA controller foundation and cabinet construction, and programing, boring inspection, fiber optic cable and conduit construction, fiber optic termination and testing and roadway construction inspection. Gabriel was responsible for inspecting electrical lighting, closed circuit television (CCTV) and ramp metering systems; traffic monitoring stations; traffic signals; street and highway safety lighting; fiber-optics; and electrical conduit systems.

In addition to training apprentices on behalf of the International Brotherhood of Electrical Workers (IBEW) Local 11, and Caltrans employees, Gabriel is familiar with the followings: Caltrans Standard Plans and Specifications.

RELEVANT EXPERIENCE:

Caltrans District 12 (Contract No. 12A1736), On-Call Electrical Inspection Services, Orange County, CA Lead Electrical Inspector. Inspecting and monitoring of all fieldwork and progress of the contractor and subcontractor(s) as they installed and tested system equipment. Ensured all installations meet contract documents and adhere to Caltrans, City, State and Local applicable codes, Standard Plans and Specifications. Inspecting the traffic control operation, SWPPP Compliance, drainage, electrical installation of ramp metering, street lights, upgrade conduits, LED tunnel lighting, CCTV Cameras, and associate equipment, traffic loops and associated cabling, electrical cabinets, underground utility relocation, prepare monthly estimate, review Change Orders. Project Cost:

Various.

San Bernardino County Transportation Authority, US HWY 395 Widening, Cities of Victorville & Adelanto, CA Lead Electrical Inspector. Gabriel’s responsibility on the project includes the following: on-site operations coordination, facilitating decisions for installation, Traffic Signal, Hwy Lighting, payments, monthly progress payments. submittal review, RFI’s contract change order review and coordination with other construction divisions within Caltrans and serving utility companies. Components of the work include the installation of underground electrical conduit by directional bore and or open trenching method, CIDH foundations for signals and lighting, utility coordination. Project Cost: Various.

Caltrans District 7, I-405 San Fernando Valley Improvement Project Senior Electrical Inspector. As a lead inspector, Gabriel was responsible for the following: on-site operations coordination, facilitating decisions for installation, traffic control, payments, contract change orders, monthly progress payments and coordination with other construction divisions within Caltrans. Components of the work include the installation of precast, pre-stressed concrete panels and a metal beam guard railing, traffic stripes, water retention basin (Austin vault), dowel bar installation, profile grinding, AC paving/grind and overlay and RSC slab replacement. Gabriel was also involved with electrical work comprising approval of equipment locations, installation of highway lighting, modify ramp meter installation, and modify traffic monitoring systems, and installation of MVDS systems.
\
Page | 24

CITY OF PICO RIVERA
On-Call Construction Management and
Inspection Services
(PR-RFP-036)
Gabriel Flores

Page 2 ends

City of Santa Monica, Various Projects, Santa Monica, CA Electrical Inspector. As Electrical Inspector for multiple City projects, Gabriel’s duties included overseeing installation, providing construction management, interfacing with city officials, meeting delivery dates and planning and scheduling for multiple projects. Projects included 3rd Street Promenade Lighting, Downtown Signalization / Modification, Pio Boulevard Streetscape / Signalization, Olympic Boulevard Streetscape/Signalization, Pier Lighting Modifications, Parking Lot Lighting Projects (public libraries and beach parking lots), Street Lighting Conversion Projects (from series to multiple throughout the City of Santa Monica) and Santa Monica Airport Lighting. Project Cost: Various.

Caltrans District 7, On-Call Construction Inspection & SR-60 Construction Inspection, Los Angeles, CA
Principle Resident Engineer. Gabriel’s responsibility on the project includes the following: on-site operations coordination, facilitating decisions for installation, Traffic Signal, Hwy Lighting, payments, monthly progress payments. submittal review, RFI’s contract change order review and coordination with other construction divisions within Caltrans and serving utility companies. Components of the work include the installation of underground electrical conduit by directional bore and or open trenching method, CIDH foundations for signals and lighting, utility coordination. Project Cost: Various.

Orange County Transportation Authority (OCTA) / Caltrans EA#12-0F96C and 12-0F96E4, I-5 HOV Improvement Project, San Juan Capistrano, CA
Assistant Resident Engineer. Gabriel provides electrical inspection support for the OCTA I-5 HOV improvement project from PCH to San Juan Creek Road. The project will reduce traffic congestion on the I-5 within the project limits by providing more capacity and by reducing the volume of traffic in the other lanes, provide an extension of the existing I-5 mainline HOV network to the north within the proposed project limits, provide improvements to auxiliary lanes to relieve congestion at diverge and merge locations, and increase operational efficiency within the interchange areas by providing additional lanes on several ramps and by extending the existing auxiliary lanes. The project construction will be in accordance with the approved Project PS&E. Project Cost: Various.

City of Carson, I-405 / Wilmington Interchange, Carson, CA Constructability Reviewer. Performing constructability review of electric submittals for the Wilmington Avenue and I-405 interchange modification project. Works consist of the reconfiguration of existing ramps and the widening of a two-lane roadway to eliminate the existing bottleneck, increase capacity and improve safety. Hill’s scope of work comprised surveying, pavement, sidewalks, drainage facilities, traffic signals, construction inspection, critical path method (CPM) scheduling and facilitating and attending public meetings and preconstruction meetings with stakeholders. (03/13 - 06/15) Caltrans District 7, Various Projects, Los Angeles, CA
ARE / Electrical Inspector. Gabriel was responsible for inspecting electrical lighting, closed circuit television (CCTV), ramp metering systems, traffic monitoring stations, traffic signals Pump House, power distribution. Vincent Thomas Bridge power up grades i.e.; new motor control room, switch broads, switch gear, panel boards. Including new installation of AVC station. WIM systems, HAR systems, CMS.

Page | 25

CITY OF PICO RIVERA
On-Call Construction Management and
Inspection Services
(PR-RFP-036)

KEVIN AUSTIN, PE
SWPPP Compliance / Inspector
Mr. Austin has more than 12 years of experience as an inspector on various construction projects and as a result is cross trained to inspect numerous construction activities. Mr. Austin has significant experience with sidewalk, curb & gutter, ADA ramps, storm drains, manhole construction, traffic signals, street lighting, roadway construction, AC-HMA paving, and LCB/JPCP Pavement, roadway excavation, striping, drainage, underground utilities and grade separations. Mr. Austin has extensive experience with LCB and JPCP Concrete pavement, Minor Concrete, HMA / RHMA Paving, Traffic Control, MBGR/ MGS, Drainage, Water and Sewer Lines, Landscape, Safety, and SWPPP. Responsibilities includes construction inspection and Quality Control, daily reports and quantities take-offs, review and monitor schedule of work, compliance with plans and specifications and certificates, shop drawings, change orders, submittals and RFI’s, safety compliance, NPDES compliance, preparing and reviewing as-built plans, and preparing final punch list.

Mr. Austin prepares routine daily diaries and checks to see if the work is constructed to the lines and grades shown in the plans. He verifies materials incorporated into the work meet the contract requirements and checks quantities, size and dimensions upon arrival. He has extensive knowledge of the Caltrans Standard Plans and Specifications, Caltrans Construction Manual, OSHA Safety Manual, Traffic Control Manual, WATCH Manual, and Green Book. Mr. Austin has extensive experience with Office Engineering, office procedures; and project documentation. Mr. Austin has excellent work ethics, communication skills, and the ability to multitask.

RELEVANT EXPERIENCE
City of Pico Rivera, Street Pavement at Various Locations (CIP No. 50048), Pico Rivera, CA Construction Inspector responsible for construction inspection services for various projects including roadway embankments, grade checking using survey stakes, hot mixed asphalt (HMA), PCC paving, city’s annual resurfacing, sidewalk and curb and gutter construction. Scope of work includes pavement resurfacing, AC pavement grind and overlay, remove and reconstruct AC pavement, PCC Improvements, cold mill existing AC pavement, replacement of sidewalk, ADA access ramp improvements, construct residential driveways, traffic signage and striping.

Responsible for performing daily construction inspection to ensure contractor was building per contract plans and specifications, recorded details including Daily Inspection Reports accurately reflected construction progress, assisted with quantity estimates, change order process, marked as-built drawings of actual construction and site conditions, took progress photographs and logs, tracked schedules and maintained a good working relationship with the contractor and client. Project Cost: Various.

City of Rialto, Riverside Avenue Central Reconstruction, Rialto, CA SWPPP / Construction Inspector. Responsible for roadway project per plans, specification, and special provisions in terms of managing, scheduling, and budgeting. Performed site inspection duties, performing safety checks of the field personnel and construction tools and equipment. Submitted RFIs, Submittal, Change Orders, Inspection & Survey Requests. In addition, prepared daily construction visits to record daily/monthly construction reports & photos, executing purchase orders, tracking deliveries and logs, conducting safety meetings, submitting payrolls to accounting of field personnel.

EDUCATION
BS, Civil Engineering, California
State Polytechnic University,
Pomona

LICENSE
CA, Profession Civil Engineer,
No. C83422
Qualified Stormwater
Developer (QSD), No: 83422
10-Hour CalOSHA: General
Construction Safety and Health
Page | 26

CITY OF PICO RIVERA
On-Call Construction Management and
Inspection Services
(PR-RFP-036)
Kevin Austin, PE, QSD

Page 2 ends

County of San Bernardino, Redwood Avenue and Other Roads, Fontana, CA SWPPP Compliance / Construction Inspector. The project includes work to be performed on Redwood Avenue, Live Oak Avenue, Elm Avenue and 4 smaller nearby streets. The project included construction spans of approximately 4.7 miles of Mill and Overlay with 1.64 miles of leveling course needed only on Redwood Ave.

Additionally, damaged sidewalks will be repaired as noted in previous discovery efforts. Responsible for grade checking, inspection of HMA pavement, removal and resurfacing, construction of concrete pavement, sidewalk, curb, curb & gutter, curb ramp, V-gutter, drainage and sewer system, grouted rock strip, landscaping, retaining wall, striping and verification of SWPPP implementation, traffic control, and safety. Project Cost: $4.5 Million.

City of Rialto, Building 300 Inspection & Support Services, Rialto, CA SWPPP Compliance / Construction Inspector responsible for inspection of The Community Center Rehab located at 214 North Palm Avenue in Rialto involved the rehabilitation of Building 300’s Day Care Center. The work included renovation, ceiling, flooring, lighting, and windows replacement. It was determined that asbestos containing materials (ACM) existed within the facility. Appropriate measures were required to remediate and dispose of the ACM, per Cal-OSHA and local NESHAPs (South Coast AQMD) regulations as well as other applicable local regulations.

City of Rialto, Merrill Avenue Improvements, Rialto, CA SWPPP Compliance / Construction Inspector Responsible for roadway and sidewalk project per plans, specification, and special provisions in terms of managing, scheduling, and budgeting. Performed site inspection duties, performing safety checks of the field personnel and construction tools and equipment. Submitted RFIs, Submittal, Change Orders, Inspection & Survey Requests. In addition, prepared daily construction visits to record daily/monthly construction reports & photos, executing purchase orders, tracking deliveries and logs, conducting safety meetings, submitting payrolls to accounting of field personnel. Project Cost: Various.

Caltrans District 12, On-Call Roadway Construction Inspection Services, Orange County, CA Lead Roadway Inspector. Performs roadway construction inspection, quantity calculations, checking grade and alignment, traffic control review, lane closures, and assuring compliance with project plans and specifications.

Duties includes identifying actual and potential problems associated with the construction project work and recommending sound engineering solutions in a timely manner; maintains awareness of safety and health requirements and assuring compliance with applicable regulations and construction contract provisions for the protection of the public and construction project personnel. Project Cost: Various.

Orange County Public Works, On-Call Roadway Construction Inspection Services, Orange County, CA SWPPP Compliance / Public Works Inspector. Responsible for various construction projects including cold milling and asphalt overlay (Rubber Hot Mix Asphalt (RHMA) and pedestrian/bicycle bridge. Coordinated material testing in accordance with project specifications and monitored asphalt temperatures during the paving operations. Daily monitoring of the Erosion Sediment and Chemical Control Plan (ESCCP) BMP’s including effective dust control. Project Cost: Varies.

TowerJazz Semiconductor, Newport Beach, CA
EHS Manager / Senior Environmental Engineer. Direct oversight for 2 Safety staff and 2 onsite support vendors, indirect oversight for 40 person ERT. Plan, secure and implement facility EHS program including procedures, budget and document control. Evaluate and mitigate hazards to reduce recordable in cident rate and lost-time accidents. Notable achievement: Reduced LTA rate by approx. 50% to meet company objectives. Oversight on ISO 14001, OHSAS 18000 and ISO 9001 (Quality Management Systems).

Primary facility contact facility audits and inspections including local Public Works departments.

Page | 27

CITY OF PICO RIVERA
On-Call Construction Management and
Inspection Services
(PR-RFP-036)

CHETAN SHAH, PE
Construction Inspector
EDUCATION:

MBA, (Gen. Management)
Cal State Fullerton,
Fullerton, CA
MS, Civil Engineering
(Construction
Management)
NCSU, Raleigh, North
Carolina
BS, Civil Engineering
(Structures)
Gujarat University, India
Chetan has nearly 30 years of engineering, construction, project and program management experience, his expertise being CPM Scheduling, Claims Analysis/Mitigation, Document Control, Cost Estimating and Constructability review. He has worked in various sectors; Transportation projects involved highways/freeways, interchange improvements, rail projects including grade separation, airports, city improvement projects, marine structures, coastal and recreational facilities. Chetan’s duties included baseline CPM and monthly update review, for conformance to Specs/Caltrans standards, Critical Sub-critical analysis, Digger Comparison, Cost/Resource analysis - Cash Flow/Manpower Histograms, Constructability review, documenting Owner savings, Earned Value analysis, Revisions/Recovery Schedules, Shadow Schedules, Cost Estimating, Delay Impact analysis. Duties also included Contractor correspondence, Presentations, Executive Monthly reports, analyzing Potential Claims/Delays, Time Impact Analyses, Claims Reports & DRB papers, Expert Testimony. Chetan is extremely proficient in Primavera Project Planner (P6) (version 18.8), P6 Contractor, MS Project; Claim Digger, Schedule Analyzer Pro; Graphics/BIM; Excel, Word, PowerPoint.

RELEVANT EXPERIENCE
LA Metro, I-5 North County Enhancement, Santa Clarita, CA CPM Scheduler. The $670 million enhancements includes the addition of high occupancy vehicle (HOV) / carpool lanes in each direction along I-5, extension of the northbound truck lane from Gavin Canyon undercrossing to Calgrove Blvd. off-ramp. The Project will consist of I-5 Freeway improvements between SR-14 and Parker Road. It will include 14.6 miles of freeway widening to construct HOV Lanes, Truck Lanes, and Auxiliary Lanes between interchanges. Responsible for baseline schedule and monthly updates; compile reports showing critical path analysis, variances, logic revisions; Time Impact Analysis for various delays, issue tracking/analysis, as-built tracking using Daily Reports, internal updating, earned value analysis, claims analysis/avoidance including DRB position papers, DRB presentation, claims negotiations, inefficiency analysis, and compile monthly executive status reports.

Project Cost: $670 Million.

SBCTA, Laurel Street Grade Separation, Colton, CA
CPM Scheduling / Claims Analysis. This $23 million project constructed a grade separation between a local street and BNSF railroad tracks – a PC/PS bulb-tee girder bridge, including an additional bridge to access a local business, secant pile and conventional retaining walls, drainage systems, utility relocations, roadway lighting, irrigation, and landscaping. The work required traffic control, detours, and lane closures.

SBCTA (former SANBAG), I-10/ Cherry Ave & UPRR Bridge Widening, Fontana, CA CPM Scheduling / Claims Analysis. I-10/ Citrus Avenue project replaced existing 4-lane bridge over I-10 with a new 7-lane bridge, widened existing 3-lane bridge over railroad tracks to a 6-lane bridge, improved ramps, and upgraded intersections. The I-10/ Cherry Avenue: project replaced existing 5-lane bridge over I-10 with a new 8-lane bridge from Slover Avenue to Valley Boulevard, widened the existing 4-lane bridge over the railroad tracks to an 8-lane bridge, improved on-/off-ramps, added a new loop ramp for NB Citrus Avenue traffic to WB I-10, and upgraded the intersections. Project Cost: $50 Million.

Page | 28

CITY OF PICO RIVERA
On-Call Construction Management and
Inspection Services
(PR-RFP-036)
Chetan Shah, PE

Page 2 ends

OCTA, SR 57 Northbound Widening Project, Fullerton/Placentia, CA CPM Scheduling / Claims Analyst. The SR-57 NB Widening, Orangethorpe Avenue to Yorba Linda Segment, added a fifth mixed-use lane, and provided highway and bridge improvements including auxiliary lanes, several sound walls and retaining walls, 2 MSE walls, a tieback wall, and the widening of 7 bridges. Duties included review of the baseline schedule and updates, document control, Delay issue tracking, prepare WSWD’s, TIA and claims analysis, prepare claims reports and DRB position papers, and assist in claims negotiation and settlement meetings. Cost:
$53 Million.

LAMTA (METRO), Sound Walls 5 & 7, Los Angeles, CA
Project Controls Oversight. The projects consisted of four miles of sound walls at various locations, including SR134 in Burbank (Package 7) and on I-405 in Granada Hills/North Hills (Package 5). In addition to sound wall construction, freeway shoulders and existing bridges were widened (projects were designed by Caltrans and managed by METRO). Duties included review of the baseline schedule and updates, critical path analysis, Delay issue tracking and response, TIA and claims analysis, assist in claims negotiation and settlement meetings.

Project Cost: $26 Million.

Caltrans District 7, On-Call CPM Scheduling and Claims Analysis Contract Oversight CPM Scheduling / Claims Analyst. The CPM and Claims Analysis contract with Caltrans District 7 involves providing CPM Analysis and Claims support on various ongoing projects in District 7 that are divided into 6 Task Orders.

Responsibilities include oversight and review of work done by individual reviewers on each project; compiling monthly executive reports which include a summary of work accomplished and a graphical overview tracking allocated funds to actual usage. Project Cost: Various.

Los Angeles World Airport (LAWA), Tom Bradley West Core Improvements Project, Los Angeles, CA CPM Analysis / Fragnet Analysis. The project involved expansion & renovation of the existing Tom Bradley International Terminal (TBIT) central core and west gates, and associated improvement projects. The expansion of the central core included 500,000 sq. ft. of new construction on six (6) levels. In addition, approximately 300,000 sq. ft. of the existing TBIT was extensively renovated. Duties included development and review of the baseline schedule, cost analysis, change order analysis and tracking of delay claims, impact analysis for delay issues. Project Cost: $1 Billion.

Federal Rail Authority, California High Speed Rail Oversight Work, Sacramento, CA Project Controls Oversight. The California High Speed Rail project is a mega multi-phase rail project that plans to connect the Anaheim and Union Station in Downtown LA with San Francisco via the Central Valley, operating on a dedicated grade-separated track for much of the proposed route. As part of oversight agency, duties include review and data manipulation of Construction Packages 1-4. Project Cost: $5+ Billion.

Caltrans EA No. 04-0438U3, Richmond San Rafael Bridge Claims, Richmond, CA Senior Claims Analyst. The Richmond San Rafael Bridge project was a large $500 million endeavor to retrofit the Richmond San Rafael Bridge. The Claims Analysis related to a claim submitted by Agra Foundations Inc., a subcontractor working for the prime contractor Tutor-Saliba / Koch / Tidewater JV that was in the amount of $45 million for various impacts on the project. Duties on claims analysis included As Planned and As Built schedule analysis, looking at Time Impact Analysis, analyzing what-if scenarios based on the Measured Mile approach, writing the findings as part of the final claims report. Project Cost: $45 Million.

Page | 29

CITY OF PICO RIVERA
On-Call Construction Management and
Inspection Services
(PR-RFP-036)

NICOLE SALEM
Labor Compliance
Nicole monitors construction activities to ensure the public right of way is properly maintained and restored.

She has a working knowledge of the Standard Specifications for Public Works Construction (Greenbook) and the Standard Plans for Public Works Construction, and experience in their use. Nicole analyzed certified payrolls and fringe benefit statements, conducted contractor audits, and conducted employee interviews to verify prevailing wages. Nicole evaluated adherence to applicable provisions of state labor laws; met with employers, employees, and their representatives to explain labor code sections; and verified required wage adjustments were made.

RELEVANT EXPERIENCE
City of Pico Rivera Public Works, Rosemead Boulevard Roadway Rehabilitation (Project No. 50041), Pico Rivera, CA
Labor Compliance responsible for labor compliance services for the Rosemead Boulevard Roadway Rehabilitation Project, CIP No. 50041 (Project). The Project will provide improvements on Rosemead Boulevard, between Whittier Boulevard and Gallatin Road. The scope of work includes pavement resurfacing, AC pavement grind and overlay, remove and reconstruct AC pavement, PCC Improvements, adjustment of utility valves, vaults and manholes, replacement of damaged curb and gutter, replacement of sidewalk, ADA access ramp improvements, traffic signage and striping, and trench remediation on Paramount Blvd. 240 feet northeast of Mines Avenue. Project Cost: $1.2 Million.

City of Pico Rivera, Street Pavement at Various Locations (CIP No. 50048), Pico Rivera, CA Labor Compliance responsible for labor compliance services for various projects including roadway embankments, grade checking using survey stakes, hot mixed asphalt (HMA), PCC paving, city’s annual resurfacing, sidewalk and curb and gutter construction. Scope of work includes pavement resurfacing, AC pavement grind and overlay, remove and reconstruct AC pavement, PCC Improvements, cold mill existing AC pavement, replacement of sidewalk, ADA access ramp improvements, construct residential driveways, traffic signage and striping. Project Cost: Various.

City of Indio, As-Needed Professional Services for Construction Management and Inspection, Indio, CA Labor Compliance Officer responsible for providing as-needed Labor Compliance Services. Project involves Prop 84 Federal and State funding. Nicole is responsibilities include preparing the labor compliance checklist for review at the preconstruction meeting to inform the contractor and subcontractors of all regulatory obligations for the project. She monitors and reviews certified payrolls to verify the proper DIR prevailing wage rate is being paid. Certified payrolls are crosschecked to inspector dailies to confirm classification and hours are being paid and reported properly. She also monitors fringe benefits and verified deposits were made. Project Cost: Various.

EDUCATION
MBA, Business
Administration
University of Phoenix
BA, Public Relations:

Communications,
California State
University, Fullerton
Nicole Salem has 17 years of experience in the construction and engineering industries, with expertise in contract administration, labor relations, and general administration relating to office engineer work. In addition, Nicole has 2 years of experience in construction inspection of roadway reconstruction and resurfacing and rehabilitation, curbs, and gutters. She interprets plans, specifications, special provisions, and other contract documents and can independently identify potential problems and propose solutions. Prepares and processes change orders, daily logs, and working day statements; collect work records; maintain accurate records of work done for payment purposes; conduct employee interviews; prepare as-built plans and performs other associated contract administration tasks.

Page | 30

CITY OF PICO RIVERA
On-Call Construction Management and
Inspection Services
(PR-RFP-036)
Nicole Salem

Page 2 ends

County of Los Angeles, As-Needed Labor Compliance Consultant Services, Los Angeles, CA Labor Compliance Officer. Nicole analyzed certified payrolls and fringe benefit statements, conducted audits on contractors and interviewed employees to verify prevailing wages. Nicole evaluated adherence to applicable provisions of state labor laws; met with employers, employees, and their representatives to explain labor code sections; and verified required wage adjustments were made. She researches, analyzes, and interprets laws and regulations on behalf of resident engineers or contractors, enabling them to address contractual questions and issues in relation to labor compliance and equal employment opportunity requirements. She has experience with all types of funding, including Prop 84, CDBG, ARRA, State and more. Nicole also enforces the new laws of SB854 and DIR monitoring. She was also in charge of writing a source document review manual for Caltrans. Project Cost: Various.

City of Carson, SR-405 / Wilmington Avenue Interchange Modification, Carson, California Labor Compliance / Office Engineer. Nicole was responsible for inspection of roadways and curbs and gutters.

She prepared Prepare and process change orders, daily logs, and working day statements; project documentation including processing RFIs, CCOs, correspondence and pay estimates. Responsible for grading, installing new ADA compliant handicap ramps, traffic control and coordinating field testing of materials. Work includes traffic coordination, paving, landscaping, concrete sidewalks, concrete aprons, signing and striping.

Nicole also attends progress meetings and produces meeting minutes. Her main task is to confirm complete, accurate and timely contract records, pertaining to construction progress, job expenditures and budget programs in accordance with State and Federal regulations and laws. The Caltrans filing methodology of 63 categories is followed on this project. Nicole also monitors labor compliance on the project, tracking federal reimbursement due to apprentice usage, and assists the Resident Engineer in preparing Contract Change Orders or necessary data for the purpose of making alterations, deviations, additions or deletions from the Contract Plans and Specifications. She prepares and updates spreadsheets to track CCO balances. Project Cost: $23 million.

San Bernardino County, Arrowhead Regional Medical Center – Labor & Delivery Remodel, Colton, CA Labor Compliance Manager is responsible for conducting payroll analysis, recommending actions to enforce labor law, crosschecking dailies with certified payrolls, verifying apprenticeship ratios are correct, obtaining certifications for apprentices and owner operators, reviewing employee interviews, calculating restitution, sending out correspondence to contractors and communicating with contractors and agencies as needed.

Nicole reviews and audit Certified Payroll Reports, attends Preconstruction Meetings and informs Contractors of all Labor Provisions, enforces SB854 Laws, prepares Restitution Cases, and reconciles inspector’s Daily Work Reports to Certified Payroll Reports. She works with outside Labor Compliance Agencies, performs field audits / employee interviews, prepares Federal and/or State Audits for Labor Compliance, conducts in-house training, and maintains Labor Compliance Files. Project Cost: Various.

Imperial County, On-Call Labor Compliance Services, Imperial, CA Labor Compliance Officer responsible for Labor Compliance Services for Imperial County, through the Imperial County Workforce & Economic Development (ICWED) for projects funded by the California Department of Housing and Community Development (HCD) and Community Development Block Grant (CDBG) Program, US.

Department of Commerce- Economic Development Administration (EDA), State Water Resources Control Board- Clean Water State Revolving Fund (CWSRF), Water infrastructure Finance and Innovation Act (WIFIA), and other grant funding agencies. Responsible for assisting the County with activities needed to ensure that workers employed by the County’s contractors and their subcontractors are hired and paid in compliance with all applicable labor standards.

Consultants and/or Subconsultants
Page | 31

CITY OF PICO RIVERA
On-Call Construction Management and
Inspection Services
(PR-RFP-036)
D. CONSULTANTS AND/OR SUB-CONSULTANTS
Fountainhead, as the prime consultant, has teamed with two local and respected subconsultant for this contract.

RMA Group, Inc. will provide Materials Testing Services and ZT Group will provide Source Inspection Services.

RMA Group Inc. will provide Material Testing Services.

RMA Group is an engineering firm providing diverse markets with a broad range of versatile engineering services since 1962. Our passion for high-end service drives constant innovation and investment in the development of world-class lab facilities and interactive management technologies. RMA Group has developed long-standing positive relationships with the agencies and firms with which we interact, establishing clear lines of communication and complete team integration. We function as an extension of our clients’ staff and are fully invested in the successful outcome of their projects. Our clients trust us to act in their best interest by providing superior levels of quality with strict adherence to their budgets and schedules.

ZT Consulting Group Inc. (ZTC) provides Source Inspection.

ZTC is a consulting engineering firm that specializes in providing quality assurance and source inspection/audit support services. ZTC was cofounded by two partners in December 2013 and its office is located in Glendale, CA. ZTC is a certified Small Business (SB) with Metro (Certification No. 6852) and registered with the State of California Department of General Services (No. 1000023419). ZTC has closely worked with numerous local public agencies in both QA and IQA capacities. ZTC’s similar project experience includes, but is not limited to, SBCTA I-10 Jefferson Interchange, and Riverside County Transportation Department’s I-10 Pepper Street Overcrossing.

ZTC is experienced in the development and implementation of local agency specific Quality Assurance Program (QAP) or project specific Quality Management Plan (QMP) and Source Inspection Quality Management Plan (SIQMP), as well as performing Facility / Record Audits, Quality Assurance/Verification (QA/QV), Independent Quality Assurance (IQA), and other quality engineering associated support services.

The table below list our subconsultants and services, contract information and a reference for each subconsultant.

Subconsultant Name /
Address Contact Information Reference
RMA Group
122130 Santa Margarita Court
Rancho Cucamonga, CA
91730
Services: Material Testing
Slawek Dymerski
President
909.989.1751
[email protected]
Project: Flower Street Sewer Main
Improvements
Arnie Cvek
City of Santa Ana
714.647.5051
[email protected]
ZT Consulting Group, Inc.
1041 East Green Street
Suite 204
Pasadena, CA 91786
Services: Source Inspection
Farzad Tasbihgoo, PhD, PE,

CQA, CWI, PCI III
Principal Engineer
818.929.8162
[email protected]
Project: Atwater Non-Motorized
Multimodal Bridge
Dung D. Tran, Project Manager
City of Los Angeles
213.485.5046
[email protected]
Work Approach
Page | 32

CITY OF PICO RIVERA
On-Call Construction Management and
Inspection Services
(PR-RFP-036)
E. WORK APPROACH
Project Understanding
The City of Pico Rivera Public Works Department intends to have available contractual “as-needed” professional and technical Consultants to support its Construction Management and Inspection Services in a variety of activities. These activities may include, but not limited to, construction management, document control, claims mitigation, contract administration, utility coordination, labor compliance, material testing services, construction inspection, and project close-out services.

Fountainhead understanding that projects may include but will not be limited to, roadway pavement rehabilitation and/or restoration, streetscape, landscaping and irrigation systems, utility, bridges, safety lighting, traffic signal, water treatment and distribution systems, sewer systems, flood control and storm drain facilities, parks, general facilities (chain-link fencing/gates, retaining walls, etc.) and other Public Works construction projects.

Fountainhead understands that we will work under the general supervision of the Construction Services Division or other Department representatives. Fountainhead support includes pre-construction, construction, to postconstruction services. We also understand that this Professional Services Agreement (PSA) is for five (5) years with a not-to-exceed basis. We also understand that our services will be provided on an as-needed basis through the issuance of a task order proposal basis.

Project Approach
Fountainhead understands that the City's project goals involve assisting their staff members with various aspects of CM throughout all three project stages, including maintaining an accurate record per the Caltrans LAPM so the City can be fully reimbursed by the State.

We will partner with the City to provide you with a quality project built to meet specifications and expectations, while staying on schedule and within budget. Our methodology to accomplish these goals is to provide the right staff who are qualified to handle the technical and administrative challenges the project may face. We take our lead from the City’s designated project manager and owner’s representative as we perform the CM tasks outlined in the scope of services. We are present through all phases of the project from pre-construction, construction, and post construction. Our philosophy is to be proactive and to mitigate problems before they arise, such as monitoring the contractors and knowing the plans, specifications, permits and agreements as early as possible, while also being vigilant of site conditions and contractor operations. Our proposed staff has been carefully chosen for the On-call projects.

Fountainhead understand the technical challenges that these projects may face, and by reviewing the project plans, visiting the site and attending the preproposal meeting, we will gain an understanding of the project and prepared a specific approach tailored to the needs of the City. Our proposed team has the experience and expertise to address the project needs, challenges, goals, and objectives within the scope of services.

Project Manager / Construction Manager
Fountainhead acknowledges and understands the scope of services required during the pre-construction, construction and postconstruction phases of the project and we are available to mobilize immediately. Our proposed construction manager, Zouheir Saleh, PE, CCM & QSP/D has more than 35 years of experience, including Caltrans Area Senior Bridge Engineer. In addition to Caltrans knowledge and experience, the On-Call CM & Inspection Services
City of Rialto
Page | 33

CITY OF PICO RIVERA
On-Call Construction Management and
Inspection Services
(PR-RFP-036)
team has experience completing similar, local construction projects funded by the State and Federal Highway Administration (FHWA) and is familiar with the strict administrative requirements of the Caltrans Local Assistance Procedure Manual. Our key team members are 100% committed for the duration of the contract.

Fountainhead Construction Manager, Zouheir Saleh, is qualified, experienced and has the skills necessary for your project’s success. He has expertise inmanaging the construction and inspection of some of the most demanding and complex capital projects in California, including services for numerous roads, highways, drainage, sewer, building, bridge and structures projects for public sector clients and transportation agencies such as other local cities, counties, and Caltrans.

Fountainhead has provided construction management services on over 60 roads and highways. From this experience, we understand each project has unique needs and we offer customized construction management services to meet each one.

Responsibilities of the Inspector
The inspector’s primary responsibility is to make sure that permanent structures and facilities are constructed in
accordance with project plans and specifications and to ensure that the operations and/or products meet the quality standard.

The inspector is also responsible for determining the design adequacy of temporary structures proposed for use by the contractor. Our qualified inspector has a thorough knowledge of specifications and exercise good judgment. The inspectors keep a detailed diary of daily observations, noting particularly all warnings and instructions given to the contractor. The inspector maintains continual communication with the contractor and resolves issues before they become problems, anticipated delivery. Timely submittal processing is critical to make sure all requirements are met on time and without delay. This enables the contractor to procure materials and schedule the work accordingly without any delay.

Record Keeping and As-Built Plans
In addition to construction inspection, our inspectors are also responsible for maintaining an accurate and complete record of work that is being performed by contractors. Project records and reports are necessary to determine that contract requirements have been met so that payments can be made to the contractor.

Project records are kept current, complete, accurate, and are submitted on time. It is critical that the inspector keep a written diary of the activities that take place in the field. The diary contains information concerning the work being inspected, including unusual incidents and important conversations. This information may become very critical in the case of legal action for litigation involving construction claims or job failure. As-built plans reflect any deviation that may exist between the project plans and what was built in the field. Accurate and complete as-built plans are very important and useful for maintaining the bridges, and any future work on the bridges. The as-built plans also provide input and information for future seismic retrofit of the bridge.

Frisbie Park
City of Rialto
Summit Avenue Box Culver
City of Fontana
Page | 34

CITY OF PICO RIVERA
On-Call Construction Management and
Inspection Services
(PR-RFP-036)
Project Management Plan
It is our understanding that tasks issued under this contract may potentially include both full CM services requiring the mobilization of an entire team or providing select and specialized resources to support a joint project team. For large scale projects, we propose that the project manager, in association with the resident engineer develop a comprehensive project-specific management plan that clearly defines the roles and responsibilities of all team members, establishes meeting schedules and communication guidelines, defines contract administration procedures, and establishes quality assurance procedures. This document is prepared after consultation with the City and integrated in the City’s standard forms, practices and procedures.

Fountainhead also recognizes that the City may wish to staff upcoming projects with an integrated team. In forming an integrated team, Fountainhead proposes to work with the City to perform a realistic assessment of staff capabilities, experience, and interests for the purpose of assuring that the most appropriately qualified and trained personnel are assigned to specific tasks and those risks are managed. Fountainhead has successfully integrated client staff on more than 100 construction projects.

Our team reviews the plans and specification for constructability and completeness; and visit the project site to determine constraints and limitations of the project to ensure the final drawings and specification are complete and address specific job conditions to avoid field issues and construction claims. In addition, our team assists the City with evaluation of construction bids. After awarding the contract our project manager assigns the best qualified inspector(s) who has extensive experience and knowledge for the project based on the required work discipline for each specific project. • Resident Engineer
• Construction Inspector
• Public Works Inspector
• Project / Document Controls
Identity Team Member
Obtain City Contract
Manager Approval of
Team Members
Prepare Total
Budget Estimate
Project Manager
Zouheir Saleh, PE
• CM / RE
• Roadway Inspector
• Building Inspector
• Electrical Inspector
• Landscape Inspector
• CPM Scheduler
• Labor Compliance
• Community Outreach
Prepare Total Budget
Estimate
Obtain City’s Contact
Manager Approval of
Team Members
Page | 35

CITY OF PICO RIVERA
On-Call Construction Management and
Inspection Services
(PR-RFP-036)
Mobilization Plan
Interfacing with of the City’s Agreement Administrator
Our project manager serves as the central point of contract with the agreement administrator during contract formation and throughout the duration of the project to ensure that appropriate resources are mobilized and that the overall needs of the City are being met in a timely and cost-effective manner. During construction, our resident engineer coordinates closely with the agreement administrator concerning day-to-day project
administration, including daily work force requirements, work hours, and other field-related needs.

During the preparation of task orders, the project manager works closely with the City staff to structure a team which best meets the City’s needs. A mobilization and demobilization plan for each project are developed and submitted to the City’s agreement administrator for review and approval during task negotiations. This plan is in the form of a bar chart schedule which shows when specific members of the CM team are to start, and finish based on the anticipated contractor’s schedule for completing the various disciplines of the project work. This schedule is closely monitored during actual construction and adjustments made accordingly. This has been very effective in controlling the cost and schedule of the construction management team. For the most part, the staffing of the construction management teams and their associated costs on recent projects have met the budget. An exception would be in the case of a project for one reason or another that has been delayed.

However, when this occurs, our staffing approach does much to control the increase in potential staffing costs.

CM Task Approach & Work Plan
Upon award of contract, and preceding the constructability review, the Fountainhead team kick-off construction with the following activities:

1. Meet with the City to establish expectations and discuss the best approach to constructing and managing the project.

2. Initiate communications with all third-party agencies, utilities and the design team to confirm scope and timing of work required to support the construction contract.

3. Meet with the City’s Construction and Design Oversight to establish written procedures to manage this project.

4. Review and expand the detailed construction schedule currently developed by Fountainhead in response to the various stages of work to assess constructability and identify potential time savings.

5. Review the Engineer’s Estimate, validate quantities, and provide recommendations for any required quantity
adjustments including potential supplemental funds for
flagging, SWPPP maintenance, price index adjustments, and State Furnished Materials.

Scope of Services
Fountainhead team members will focus on the following
construction elements one performing construction management and inspection services. Services includes pre-construction, construction, post-construction inspection and land development Fire Station 21
Los Angeles County Public Works
Department
Santiago Creek Channel Restoration
Orange County Public Works
Department
Page | 36

CITY OF PICO RIVERA
On-Call Construction Management and
Inspection Services
(PR-RFP-036)
Pre-Construction Phase Activities
The pre-construction phase is critical to project success and to engaging our team’s overall concept of “no surprises” resulting from a failure to communicate project information. Our team begins meeting with the City to review, implement and agree on detailed procedures, expectations and lines of communication as well as to create an environment where the City
Construction Manager team becomes integrated into a single cohesive force for managing the construction contractor. We begin with a kick-off meeting so project stakeholders like utility companies, County, the designer, and other stakeholders can identify points of contact with consultant and City staff. We also provide a detailed schedule of activities and be ready to discuss major project issues (ROW/utility/ environmental/ phasing and staging) summarized in the Early Action
Notification Letter from the RE. A document exchange generally occurs currently, which assists with the readiness review.

Constructability Review
One strategy for a successful job is to begin with a clear and complete set of bid documents. An important step to having a complete set of bid documents is to have them thoroughly vetted by a third party and then corrected before they are advertised for bid. Experienced Construction Managers (CMs) and seasoned inspectors can help with the vetting process by reviewing documents to determine if there are built-in problems, flaws that may impede construction or factors that may cause impacts to any stakeholder in terms of time, cost, or quality. One of the many services Fountainhead offers our clients during the design phase is to provide detailed reviews of draft construction plans and specifications.

To assist the City in implementing its goals, the Fountainhead team review the contract documents (PS&E) prior to advertisement for constructability and biddability. Our proven approach includes, but is not limited to:
• Visiting the project site to check the site conditions against the site plans for conflicts, including utilities that need to be relocated.
• Determining if the site accommodates the contract staging requirements. • Reviewing the site to determine the impacts to the adjacent residents and newly developed businesses. • Coordinating with and making sure that necessary plan check review results are communicated and incorporated.
• Reviewing notes on the plans.
• Review various City departments plans for compliance with applicable codes, standards, and requirements.
• Identify missing information needed to complete the intent of the project design. • Verify coordination of various design disciplines with the intention of elimination of discontinuities between the design factions
• Perform plans review/check for all electrical, mechanical, and fire systems.

On-Call CM & Inspection Services
City of Camarillo
Pre-Construction Deliverables
• Constructability Reviews
• Bid Review & Award Assistance
• Construction Management Plan
• Pre-Construction Meetings
• RE Construction Schedule
• Project Protocol
• Electronic Filing System
• Environmental Survey Report
• Communications Matrix
• Bid Analysis Report
• Pre-Construction Photographs/ Videos
Page | 37

CITY OF PICO RIVERA
On-Call Construction Management and
Inspection Services
(PR-RFP-036)
• Perform plan check and review for civil and grading, landscaping, architectural, and structural plans. • Review traffic plans for safety compliance and comprehensiveness. • Verifying contract unit prices and seeing that they are clearly defined in the contract documents and identifying if constraints and permit requirements are identified and easily understood by the Contractor. • Identified discrepancies, because of our review, is brought to the attention of the City Project Manager and Design Engineer.
• Determining if the various permits for all utility requirements are met.

We assist the City in preparing and conducting a pre-bid meeting to attract a broad array of bidders and assist those bidders in understanding the scope of work, terms and conditions of the contract, schedule constraints, permit requirements, and other planned improvements within the project vicinity. A list of prospective bidders is established, and bidder's inquiries are gathered and logged with responses disseminated to all those participating. The Fountainhead team coordinates with the City's Design Consultant in responding to any design inquiries that the prospective bidders may have. Upon submittal of the bids, the Fountainhead team assist the City in reviewing the bids and evaluating the bid results. The review involves making sure that the bids comply with the terms and conditions of the contract and that the bidders are deemed responsive bidders. After reviewing all the responsive bids, the Fountainhead team make a recommendation to the City on the successful low bidder. We then prepare, coordinate, and process Notice of Award, Agreements, and Purchase Orders.

Construction Phase Activities
Upon the contractor’s notice to proceed, the Fountainhead team verify the contractor has complied with all the permits and requirements necessary to begin the project. Certain early documents require review, such as the contractor’s Required Submittal List and the Baseline Schedule. The required submittal list and the preliminary baseline schedule (using the latest version of Primavera P6) are reviewed to determine if there are any obvious missing activities and check for any logic issues that are in error, which could affect the subsequent Baseline Schedule.

Safety: The Fountainhead team review the Contractor’s Safety Plan and Injury and Illness Prevention Program (IIPP) for compliance with CalOSHA, City and County’s Safety Program requirements. We also verify certification and monitor required UPRR safety training for all personnel on the project when project involves railroad. While the Contractor has sole responsibility for compliance with safety requirements, we monitor the Contractor’s compliance during construction activities and any reports generated through the natural progression of the project. Any observation of deficiencies in safe practices result in a request for immediate remediation and a report to the City and the contractor.

Additionally, our team monitors and enforces debris handling and disposal plans, hazardous materials communication plans, emergency action plans, job hazard analysis, incident and inquiry reports and monthly safety reports. We conduct weekly tailgate safety meetings and attend the Contractor’s scheduled safety Construction Phase Deliverables
• Survey Control Points, Staking & Cut
Sheets
• Daily Reports
• Monthly Pay Quantity Calculations
• Monthly Progress Reports
• Meeting Agendas and Minutes
• Materials / Acceptance Testing
• Certified QA Test Results
• Photographs / Videos
• Utility Coordination
• Contractor Employee EEO interviews
• Contractor DBE Utilization Report
• Punch List
• Quality Assurance
• Safety Requirements
• Daily and Weekly Reports
• CPM Scheduling
• Construction Change Order Review
• Construction Claims Mitigation
• Project Documentation Processing
• Communication / Interface with
Stakeholders
• Environmental Compliance / Mitigation
• Right-of-Way Compliance
• Monthly Progress Estimates & Invoices
• Labor Compliance
Page | 38

CITY OF PICO RIVERA
On-Call Construction Management and
Inspection Services
(PR-RFP-036)
meetings. Our efforts focus on prevention to make sure we maintain a safe work site for the contractor, subcontractors, inspectors, field personnel, visiting City staff, and the public at large. Fountainhead’s commitment to total safety excellence throughout all projects was instituted by establishing safety as a core value. To achieve Fountainhead’s goal of zero incidents, all employees are required to actively participate in the Fountainhead’s Safety Training Program conducted through its Web-based program. In addition, the Fountainhead Team develop a Code of Safe Practices specific to the project, and it cover all aspects of project safety, including personal protective equipment (PPE). All project personnel are required to read and sign-off on the Code of Safe Practices. Biweekly safety tailgate meetings are conducted in accordance with California Division of Occupational Safety and Health (Cal/OSHA) regulations, and meeting minutes are kept on file.

Stormwater Pollution Prevention Plan (SWPPP): Zouheir Saleh, PE and Kevin Austin, PE assists the City in filing all Notice of Intent (NOI) and Notice of Termination (NOT) for the project on the California State Water Resources Control Board S.M.A.R.T.S. website, as well as preparing and helping to file the required annual reports. Zouheir review and comment on the Contractor’s SWPPP document to ensure compliance with the Statewide General Permit; Our Fountainhead team review installation and maintenance of BMPs, prepare weekly stormwater inspection reports, ensure testing – if required – is completed and ensure compliance with the SWPPP document. Upon the contractor’s notice to proceed, the Fountainhead team verify the contractor has complied with all requirements necessary to begin the project and that all permits are in order. We obtain copies of all relevant project permits and ensure project compliance throughout the life of the project including environmental permits, resource agency permits, and City issued permits. Zouheir works with the contractor to ensure necessary construction permits are in place, including WDID, Conditions and Standards where applicable.

Pre-Construction Conferences: Zouheir arranges a pre-construction conference with all project parties and stakeholders to reiterate communication protocols, define the roles and responsibilities for all stakeholders and to highlight important issues and key factors necessary to make this project a success.

Some of the major issues that must be addressed at the earliest time are the utilities relocations, right of way, long lead items, and the traffic management plan (TMP). At the meeting, Zouheir reviews the contract, pertinent sections of the plans as well as specifications and permits to help coordinate with the City, contractors, and stakeholders in attendance at the meeting. Our team also records the meeting minutes and distribute to all parties. We take photos and video of the project site and surrounding streets including haul routes and staging areas prior to the start of construction and NTP. Zouheir reviews and approves the contractors’ early submittals including SWPPP, critical path method (CPM), safety, notification of Dispute Resolution Advisors (DRAs) or Dispute Resolution Board (DRB), notices of material to be used, shop drawings, concrete mix design, and other required early submittals.

Weekly / Monthly Project Progress Meetings and Reports: During the construction stage, Zouheir holds weekly construction progress meetings attended by the Contractor, City, County, relevant utility companies, and others. In these meetings, an agenda is submitted which includes items the City and Contractor would like to discuss. Items that are not resolved from the agenda are carried on to the next meeting. We review the project status, the look-ahead schedule including long lead items, outstanding RFIs, submittals, and any other issues of concerns. Meeting minutes are prepared and distributed, requesting either the concurrence of those who attended, or suggested corrections to the minutes. Afterwards, the minutes are filed as either Page | 39

CITY OF PICO RIVERA
On-Call Construction Management and
Inspection Services
(PR-RFP-036)
approved or amended. We hold a monthly meeting with the City to discuss the monthly project. The goal is to keep all stakeholders informed of progress, to mitigate issues before they arise, and to ensure that the project land within the designated time frame. Zouheir prepare the monthly project status report that summarizes the Project's overall progress against the projected project plan. The goal of a project status report is to keep all stakeholders informed of progress, to mitigate issues before they arise, and to make sure that the project land within the designated time frame. The report summary includes updates to the Key Milestones Table, Progress and Deviations from Plan, Risk Register, Financial Status, Change Request History, and others.

Submittal Management Review: Fountainhead is in the habit of turning around submittals, especially those on the critical path, within a few days, if possible. This serves two purposes: first, it gives the City, Cityowned-float for the CPM schedule, which may be used later or to mitigate potential days that would be allowed to the Contractor for a contract change order; second, it helps finish the project early. Our database tracking is used to log and manage all submittals such as shop drawings, mix designs SWPPP, CPM baseline and updates, permits, and demo plans. Our P6 approach also keeps the contractor informed that a submittal is soon to be due and is expected. Fountainhead’s pre-developed list of required submittals provides early notifications.

Request for Information Management Review: RFIs are evaluated to determine if a response from the field team is possible. When the RFI has no impact to schedule, budget, or quality of along the way, the RFIs are tracked in our system so responses are available for team review as soon as possible. Responses are expedited to avoid Contractor delays. To keep RFIs moving towards resolution, a status review is performed in our weekly job site meeting. Resolution of RFIs by the field staff helps keep projects within budget and schedule. Timely submittal processing is essential in assisting the Contractor in keeping on schedule. This allows early acquisition of materials and other offsite procurements, so materials are available when required. We develop a list of required submittals early, and regularly compare our list to that of the Contractor to make sure all items are identified with anticipated delivery/completion dates denoted on our schedule. A distribution list is used to verify key staff have reviewed and accepted key submittals. Our database is used to log and manage the shop drawings and sample/submittal process, allowing review of submittal status during the weekly progress meeting.

Schedule Control: Schedule control is a critical on-going task which begins with the baseline schedule. Our team utilizes several tools for schedule control as described herein.

Base-Line Schedule Review: Our CPM Scheduler, Chetan reviews the contractor’s initial baseline schedule to make sure it is reasonable, practical, and includes a comprehensive plan for accomplishing the work. Chetan and Zouheir verify whether the contractor has provided the appropriate schedule to interface with other activities, such as submittal reviews, material deliveries, traffic management, and agency reviews.

If the initial submittal is not acceptable, we work with the contractor to develop a schedule that is achievable and meets contract requirements.

Monthly Schedule Updates: Chetan reviews the contractor’s schedule updates for accuracy and runs claim digger reports to compare with previous approved schedule update and verify the schedule is not being manipulated. We run reports based on the monthly update that indicate activities that have not started by their early start date, allowing us to discuss methods of recovering lost days.

Page | 40

CITY OF PICO RIVERA
On-Call Construction Management and
Inspection Services
(PR-RFP-036)
3-Week Look Ahead Schedule: Chetan track the contractor's progress using the start and finish dates shown on the 3-week look-ahead schedule submitted by the contractor each week and compares it with the monthly schedule update. The actual dates on the 3-week look head schedule are verified against inspector diaries. Any discrepancies in start and finish dates between the 3-week look-ahead schedule, monthly schedule updates, and inspector diaries are discussed during monthly schedule review meetings with a strategy to manage the project within contract duration.

Document Management System: Fountainhead personnel provide an electronic, cloud- based Construction Management System (CMS), or we can use an Oracle/Primavera system that tracks and analyzes the schedule, budget, cost-to-date, and change order information for Zouheir Saleh. Office Engineer, Nicole Salem, establish and maintain a filing system, in hard and electronic copy using Caltrans Construction Manual as guidelines to make sure there is compliance with state funding requirements for this project. On a weekly basis, Nicole uploads the electronic data documentation to the City's Major Projects Portal. Submittals and RFI logs are developed and maintained, and all RFIs and submittals are logged and tracked in accordance with when it was received and returned to the Contractor for disposition and response status.

Communications and Correspondence: We prepare a communication protocol as approved by the City.

Fountainhead log all communication, provide timely responses as stated by the communication protocol, seek approval from the City as appropriate, certify contract compliance, and communicate all submittals.

Typically, such correspondence is logged in Category 5 of the Caltrans Filing System. All correspondence from and to the Contractor and others are filed electronically in CMS and made available anytime for review by the City.

Progress Reporting and Daily Reports: The Fountainhead team provide the City with project status reports on a weekly and monthly basis and as requested by the City. The weekly reports provide a summary of the activities completed the previous week, ongoing activities for the current week and scheduled activities for the following week. This report also includes any field conflicts and issues that may have arisen during the week. The monthly construction management reports describe the status of the project’s budget, schedule, submittals, change orders, claims in process and current and anticipated work progress. Project inspectors are required to complete daily inspector reports (DIRs) within a 24-hour period of witnessing the work performed. These DIRs include field activities; which are tracked by contract bid item, labor, and equipment; a narrative of the work; and related photographs. Each report is signed by the inspectors and then reviewed and signed and reviewed by the Senior Resident Engineer / Construction Project Manager.

Project Changes and Construction Change Order Management: Requested changes must be reviewed and evaluated for merit. Our review also assesses the impacts to project schedule and budget (independent cost estimates or [ICEs]) and we advise the City with a recommendation of findings. On conceptual approval as to merit, we negotiate these changes with the Contractor and submit these negotiated change requests to the city construction Manager for concurrence approval. Recommendations regarding change order cost and schedule impacts are based on independent cost estimates developed concurrently with the Contractor’s request and include a record of negotiations. This may also include a schedule fragment analysis using Primavera P6 to manage progress recovery associated with the requested change.

Material Testing: We will manage the required soils and materials testing through our testing consultant, RMA Group, and inspections to determine materials incorporated into the project are procured, installed and tested, as well as modified (if necessary) so they conform to the contract documents and applicable codes, standards, procedures and processes. Sampling and testing activities will be conducted in accordance with Page | 41

CITY OF PICO RIVERA
On-Call Construction Management and
Inspection Services
(PR-RFP-036)
applicable testing guidelines. We will also maintain testing summaries to confirm that all unacceptable work is recorded and corrected prior to the contractor placing new work on non-conforming work. We will test materials as necessary per the project plans, specifications, and the City’s requirements.

Source Inspection: Fountainhead schedules and coordinates source inspection with ZTC. ZTC develops the project Quality Acceptance Plan (QAP) for off-site materials based on project specifications, Caltrans Source Inspection guideline, and City requirements for City’s review and approval. ZTC manages the source inspection activities based on the approved QAP.

Claims Management: Claims generally arise out of misunderstandings, lack of information or refusal by either party to enter into negotiations. Successful avoidance of claims is a result of diligent pursuit towards problem identification, understanding and resolution. Claims mitigation is accomplished by starting our contract document reviews early and by thoroughly reviewing the project plans for biddability and constructability and by implementing our document control, field inspection and CM techniques. The Fountainhead team believe most claims can be avoided through well tested mitigation techniques and communications.

Post Construction Phase Activities
Field Inspection and Punch List: As a project nears completion Fountainhead staff walks the project and document all items of work that have yet to be completed as required in the contract documents. An itemized punch list of outstanding items is developed and handed over to the Contractor to be addressed. After the Contractor has completed all the items on the punch list, a final walk-through of the project site is conducted. If the City is satisfied that all the items on the punch list have been addressed, then the Contractor is given a letter of acceptance, and final payment is authorized. Fountainhead staff coordinates with all project stakeholders during final inspections to obtain their acceptance of the improvements as required by the City.

As-Builts: The Fountainhead Team maintains a full-size set of project plans for as-built purposes.

These as-built plans are modified to reflect what was constructed and includes any authorized field modifications by the design engineer, as well as any modifications due to approved change orders. All modifications are noted in red and, upon acceptance of the contract, are submitted to the City's Design Consultant for incorporation into the final as-built plans.

Project Close-Out: Upon completion of the work and after all items on the punch list have been addressed, the Fountainhead Team issues a letter of acceptance and formally relieves the Contractor of any further responsibility for the project. The project close-out phase includes:
(1) Resolving any outstanding claims and providing supporting information, (2) Recommending approval of the final payment to the Contractor to the City, (3) Ensuring that all liens on the project by the Contractor or Subcontractors have been released. (4) Archiving all project records, including final materials certification. (5) Prepare project close out documents for Caltrans approval. (6) Assist the City staff during any audit performed by state or federal agencies. (7) Perform the 1-year warranty inspection one month before it is due and create a comprehensive punch list and follow up with contractor and Caltrans to ensure the punch list items are adequately addressed to the satisfaction of Caltrans and the City.

The Fountainhead Team prepares project close-out reports per City Standards and Caltrans Local Assistance Manual to meet all funding requirements. For the Fountainhead Team, project close-out is an important aspect of the contract and is implemented in a meticulous fashion. At this point our Account Manager ensures that the project is 100% complete from both a construction and construction management perspective. In closing project files, the Fountainhead Team makes sure that all original documents are in the project files, and we encase all records in clearly marked storage boxes per the City policy Post-Construction Deliverables
• As-built Plans
• Project Acceptance
• Final Project Completion Reports
• RE’s Material Certification
• Final Environmental Report
• Complete Set of Files
Page | 42

CITY OF PICO RIVERA
On-Call Construction Management and
Inspection Services
(PR-RFP-036)
The following section describes our approach to completing the Scope of Work Page | 43

CITY OF PICO RIVERA
On-Call Construction Management and
Inspection Services
(PR-RFP-036)
Quality Assurance / Quality Control Procedures
Internal Quality Control Program
Fountainhead has an internal quality control
program that is implemented on all
construction projects. Ivan Benavidez, PE,
Project Director is responsible for
implementing this plan. Quality control (QC)
guidelines have been standardized into our
Construction Management Manual and
construction documentation which forms the
basis for developing a project specific quality
assurance plan. Fountainhead team
members are well familiar with various
contract and inspection documentation
and forms and have been utilizing them on
construction projects for years.

The overall Quality Control activity is continuously monitored by Zouheir Salah, PE monthly and reviewed quarterly during an independent site review conducted by Fountainhead’s Project Director, Ivan Benavidez, PE. Our internal QA/QC process is simple and does not require additional time demands from the Client.

Routinely, our Resident Engineer will conduct independent reviews of the project records for their adherence to the Client’s policies and procedures.

Storm Water Pollution Prevention Plan (SWPPP)
The Fountainhead Team works with our clients to enter the project into the SMARTS system. Kevin Austin, PE, is a Qualified SWPPP Practitioner and Developer with CASQA, Trainer of Record for QSP and QSD Training Courses.Caine reviews the contractor’s SWPPP and conducts monthly project reviews to ensure compliance with the National Pollutant Discharge Elimination System (NPDES) permit and contact requirements. All Fountainhead Team members are knowledgeable on SWPPP best management practices and ensure compliance with the water pollution control plan.

Budge and Schedule Control
Cost Control: Our approach to controlling cost overruns caused by Change Orders is to reduce the number of Change Orders from the start and minimize impact to the project schedule to avoid extended overhead charges. We achieve these objectives through:
• Thorough review of the contract documents at the beginning of the project and identifying issues for resolution before they impact the project schedule.
• Thorough evaluation of all contract documents for merit determination during review of contractor Change Order Requests.
• Negotiating the best price for Change Orders using bid item unit costs and production rates from the approved Base Line Schedule to determine work duration. • Evaluating the cost effectiveness of selected overtime to avoid time extension costs. • Ensuring that daily Time and Material reports are accurate and confirmed by inspection staff.

Page | 44

CITY OF PICO RIVERA
On-Call Construction Management and
Inspection Services
(PR-RFP-036)
The Fountainhead Project Controls team creates filing electronic filing system similar to the Caltrans filing system maintained on the project. Our team is trained and ready to hit the ground running in updating all required documents.

Schedule: Schedule control is a proactive and ongoing activity that begins with the baseline schedule.

Fountainhead utilizes several different scheduling techniques to not only monitor the contractor’s progress, but to also mitigate claims and determine the merit of time extensions. Discussed below are several riskminimizing tools we utilize for schedule control.

Review of Contractor’s 3-Week Look Ahead Schedule: The 3-week look ahead schedule provided by the contractor is the source of the Actual Start and Actual Finish dates in the monthly update per the specifications. This schedule is used to verify–via job walk–that progress being shown on the weekly schedule is actually occurring. Our Office Engineer reviews the contractor’s 3-week look ahead to determine whether the contractor is working on his plan, is out of sequence, hasn’t started, or isn’t finishing activities on time. We prepared a written report complete with an analysis of the construction progress, deviations or potential deviations that may affect the critical path, as well as the less obvious issues like project adjacencies. The observations are discussed at each Weekly Progress Meeting and the scope of work. The Contractor’s baseline construction schedule is reviewed for compliance with contract requirements. We review the monthly updates for compliance with the contract. Based upon the Contractor’s weekly schedule, submittals, observations of our project team, as well as other sources of project information, we verify actual activity dates and the remaining durations in the updates. We also review and analyze the forecasts of work force, equipment, and material resources, and cash flow projections. We identify modifications and variations from the last approved schedule (logic, activities, durations, etc.) via Digger, and prepare written comments and recommendations based on the schedule update analysis.

Safety
Safety is a top priority for Fountainhead and is evidenced by our commitment to provide each member of our construction management team with OSHA-approved safety training. A health and safety plan are developed for each project under the direction of our corporate health and safety director. This plan is audited, and quarterly reviews provided to the designated project safety coordinator. Although the contractor has the primary responsibility for site safety, staff verifies that the contractor has an established safety program and brings observed safety concerns to the immediate attention of the contractor’s superintendent.

Safety Training
Fountainhead’s training program ensures our personnel are cross trained and have the ability to transition in or out for each other is someone is ill, or if there are family emergencies. To this effect our services to the Client are never impaired by personnel issues and their projects always move forward with the proper inspection and documentation needed to ensure that funding requirements are meet.

Fountainhead recognizes that jobsite safety is the highest priority on any worksite and requires vigilance by everyone. Fountainhead inspection staff is knowledgeable with the Caltrans Safety Manual and the OSHA Construction Safety Orders.

Fountainhead staff members take and / pass the Click Safety 10-hour CalOSHA Training; and provide appropriate safety training on the project. The Fountainhead PM and RE ensures that all team members comply with State Construction Safety Orders, and provisions of the State’s Construction Manual. In addition, all staff on the Fountainhead team are provided with the necessary safety equipment as required by construction safety orders and regulations of the project. These devices include, but are not limited to, the following:

Oakmont Development, City of Rialto
Rialto, CA
Client References
Page | 44

CITY OF PICO RIVERA
On-Call Construction Management and
Inspection Services
(PR-RFP-036)
F. Client References
Below is a list of Fountainhead’s most recent similar clients managing On-Call CM and Inspection Services for public agencies:

Similar Project Experience & References
Project / Location Reference Services Staff Photo

ON-CALL

CONSTRUCTION

MANAGEMENT SERVICES
Location: Pico Rivera, CA
Year Completed:
03/2020 – Ongoing
Project Cost: Various
Nadia Carrasco
Assistant Engineer
Public Works Department
City of Pico Rivera
6615 Passons Boulevard
Pico Rivera, California 90660
(562) 801-4965
[email protected]
Fountainhead is providing construction
management and inspectors on various
CIP projects:
• Water Main Replacement (CIP 21360)
• Rosemead Blvd. Rehab (CIP 50041)
• Pavement Rehab
Zouheir Saleh, PE
Nicole Salem

ON-CALL

CONSTRUCTION

INSPECTION SERVICES
Location: Camarillo, CA
Year Completed:
2020 – Ongoing
Project Cost: Various
Kyle Butler
Associate Engineer
City of Camarillo
Department of Public Works
601 Carmen Drive
Camarillo, CA 93010
805.388.5319
[email protected]
Fountainhead (acquired PPM Group)
provided construction inspection services,
consultant coordination, office engineering,
specialty inspection.
• Earl Joesph Drive Pavine ST-5025
• Annaul Resurfacing Project ST-5020
• City Tree & Sidewalk – Mission Oaks
Area LS-5035
• Daily Drive Improvements (ST-5047)
• Elm Street / Eastman School Sewe
Improvements per SSMP (SS-5042)
Zouheir Salah, PE
Cesar Cerda
Nicole Salem

ON-CALL

CONSTRUCTION

INSPECTION SERVICES /

LOCKWOOD VALLEY
EAST (NO. 50599)
Location: Ventura, CA
Year Completed:
2021 – Ongoing
Project Cost: Various
Christopher Solis, PE
Engineering Manager
County of Ventura
Roads & Transportation
800 South Victoria Avenue
Ventura, California 93009-1620
805.654.2065
[email protected]
Fountainhead provided construction
management and inspection for the
Lockwood Valley Road East Project. The
project was a 2-Layer overlay with ACHM
with Fiber over ARAM with 4 headwalls to
be constructed on existing CMP culverts.

The project was located on the east half of
Lockwood Valley Road, about 10 miles
long.

Zouheir Saleh, PE
Javier Soto, PE

CITY OF PICO RIVERA
On-Call Construction Management and
Inspection Services
(PR-RFP-036)
Page | 45

CITY OF PICO RIVERA
On-Call Construction Management and
Inspection Services
(PR-RFP-036)
Similar Project Experience & References (Continued)
Project / Location Reference Services Staff Photo

ON-CALL

CONSTRUCTION

ENGINEERING,

INSPECTION & CPM

SCHEDULING
Location: Ventura, CA
Year Completed:
11/2020 – Ongoing
Project Cost: Various
Theresa Cong
Contract Manager
Caltrans District 7
100 Main Street
Los Angeles, CA
213.718.8002
[email protected]
Fountainhead is providing professional and
technical services required for Roadway
Construction Services, including
Construction Engineering, Construction
Inspection and Critical Path Method (CPM)
Analyses services for:
• Pavement Resurfacing (EA 30240)
• US-101 Metal Beam Guardrails (EA
33110)
• Metal Beam Guard Rails (MBGRs) with
the new Midwest Guardrails Systems
(MGS) (EA 33900)
Ivan Benavidez, PE
Zouheir Saleh, PE
Javier Soto, PE
Aycan Kara
Richard Hennings

ON-CALL

CONSTRUCTION

MANAGEMENT SERVICES
Location: Orange, CA
Year Completed:
12/2017 – 09/2022
Project Cost: $3 Million
Michael Hatch, PMP
Senior Project Manager
Orange County Public
Works
1152 East Fruit Street
Santa Ana, CA 92701
714.448.9529
[email protected]
om
Fountainhead provided construction
management on various types of projects:
• Orange Park Acres Pavement Rehab
• Crown Valley Pkwy Bridge
• Santiago Canyon Road Bridge
• Santa Ana-Santa Fe Channel
Rehabilitation
• Santiago Creek Channel Restoration
• O'Neill Retarding Basin
• Barranca Channel Restoration Project
Ivan Benavidez, PE
Javier Soto, PE

ON-CALL CM /

INSPECTION SERVICES
Location: Los Angeles, CA
Year Completed:
09/2019 – Ongoing
Project Cost: Various
Roy Cruz
Senior Civil Engineer
County of Los Angeles
900 S Fremont Avenue
8 th Floor
Alhambra, CA 92803
626.476.7078
[email protected]
Fountainhead (acquired PPM Group) is
providing construction management for
various projects including:
• Pacoima Reservoir Sediment Removal
• Del Mar Avenue Bridge
• New York Drive Reconstruction
Cogswell Reservoir Restoration
• Devil’s Gate Reservoir Restoration
• South Whittier Los Nietos
Zouheir Saleh, PE

CITY OF PICO RIVERA
On-Call Construction Management and
Inspection Services
(PR-RFP-036)
Page | 46

CITY OF PICO RIVERA
On-Call Construction Management and
Inspection Services
(PR-RFP-036)
Similar Project Experience & References (Continued)
Project / Location Reference Services Staff Photo

AS-NEEDED

CONSTRUCTION

INSPECTION & LABOR

COMPLIANCE SERVICES
Location: Indio, CA
Year Completed:
06/2019 - Ongoing
Project Cost: Various
Timothy T. Wassil, PE
Public Works Director
City of Indio
100 Civic Center Mall
Indio CA, 92201
760.391.4018
[email protected]
Fountainhead (acquired PPM Group)
provided construction inspectors on
various projects including.
• Jackson Street Traffic Signal
• Jefferson & Avenue 48 Improve
• The Palms at Indio
• Parks Project PK 1707
Zouheir Saleh, PE
Cesar Cerda
Nicole Salem

ON-CALL SERVICES FOR

CONSTRUCTION

MANAGEMENT,

MATERIALS TESTING

AND INSPECTION
Location: Whittier, CA
Year Completed:
09/2018 – 05/2023
Project Cost: Various
Raul Flore
Engineering Manager
City of Whittier
13230 Penn Street
Whittier, CA 90602
562.567.9525
[email protected]
Fountainhead is providing field
inspection of electrical, dry utilities,
concrete structure, structural pavement,
landscaping, irrigation, asphalt concrete,
grading, traffic signals, street lights,
water systems, sewer systems and traffic
control, concrete drainage. Project
include, but not limited to:
• SR-74 Whittier Blvd. Widening
• Nelles at the Grove in Whittier
• Sorensen Avenue Road Improvements
• Sorensen Waterline & Pipeline
• La Strada Storm Drain
• La Strada Park Improvements
Arezo Ghiam, PE
Armando Salazar

ON-CALL

CONSTRUCTION

MANAGEMENT SERVICES
Location: Rialto, CA
Year Completed:
2018 – Ongoing
Project Cost: Various
Art Cervantes
Engineering Manager
City of Rialto
150 S Palm Avenue
Rialto, California 92376
909.644.7260
[email protected]
Fountainhead is providing construction
inspectors on various CIP projects:
• Etiwanda Corridor Improvements
• Oakmont Development / Baseline Road
at Tamarind Avenue
• CDRE Holdings 11 – Palmetto Avenue
• Riverside Avenue Central Segment
• Bud Bender Park & Community Center
• Frisbie Park (North & South)
Arezo Ghiam, PE
Javier Soto, PE
Kevin Austin, PE
Cesar Cerda
Fred Alipanah, PE

CITY OF PICO RIVERA
On-Call Construction Management and
Inspection Services
(PR-RFP-036)
Page | 47

CITY OF PICO RIVERA
On-Call Construction Management and
Inspection Services
(PR-RFP-036)
Similar Project Experience & References (Continued)
Project / Location Reference Services Staff Photo

ON-CALL CM /

INSPECTION SERVICES
Location: San Bernardino,
CA
Year Completed:
2018 - Ongoing
Project Cost: Various
Carlos Seanez, PE
Resident Engineer
San Bernardino County
Department of Public Works
825 3rd Street
San Bernardino, CA 92415
909.387.7945
[email protected]
ov
Fountainhead is providing construction
management, construction inspectors,
resident engineers, structure
representatives. Projects include:
• El Rovia Bridge is Bridge No. 58
Emergency Repair
• Hospital Road
• Hook Creek
• Riverside Road and Other Roads
• Macy Street City Creek
Fred Alipanah, PE
Cesar Cerda
Javier Soto, PE
Kevin Austin, PE

ROADWAY

REHABILITATION AT

VARIOUS LOCATIONS
CIP NO. 50048 & 50041
Location: City of Placentia
Dates: Ongoing
Project Cost: Various
Raquel Garcia
Associate City Engineer
City of Placentia
401 East Chapman Avenue
Placentia, CA 92870
714.993.8128
[email protected]
Fountainhead’s scope of work includes
pavement resurfacing, AC pavement
grind and overlay, remove and
reconstruct AC pavement, PCC
Improvements, cold mill existing AC
pavement, replacement of sidewalk, ADA
access ramp improvements, construct
residential driveways, traffic signage and
striping.

Zouheir Saleh, PE
Cesar Cerda
Kevin Austin, PE
Richard Hennings

CM SERVICES FOR FY
2022-2023 ANNUAL

PAYMENT

PRESERVATION
PROJECT (ZONE 5 & 6B)
Location: Yorba Linda
Date: 04/2023 – 12/2023
Project Cost: $11 Million
Rick Yee, PE
Deputy Director Public Works /
Assistant City Engineer
City of Yorba Linda
4845 Casa Loma Avenue
Yorba Linda, CA 92886
714.961.7171
[email protected]
Fountainhead provided CM and
inspection services for the City of Yorba
Lindas’s Annual Pavement Preservation
projects. The City of Yorba’s Annual
Pavement Preservation includes various
roads and sidewalks in Zone 5 and 6B in
the City of Yorba Linda, California. This
pavement maintenance project included
asphalt grind and overlay with ARHM
and also slurry seal of numerous
residential and arterial streets.

Javier Soto, PE
Kevin Austin, PE
Aycan Kara

CITY OF PICO RIVERA
On-Call Construction Management and
Inspection Services
(PR-RFP-036)
Rights to Materials &
Schedule of Hourly Rates
Page | 49

CITY OF PICO RIVERA
On-Call Construction Management and
Inspection Services
(PR-RFP-036)
G. RIGHTS TO MATERIALS
Fountainhead acknowledge that all responses, inquiries, and correspondence relating to the RFP and all reports, charts, displays, schedules, exhibits, and other documentation produced by the Consultant that are submitted as part of the Proposal and not withdrawn shall, upon receipt by the City of Pico Rivera, become property of the City of Pico Rivera.

H. SCHEDULE OF HOURLY RATES
Notes:

1. Overtime and weekend work is not included. Overtime is to be charged at 1.5 the above rate for Inspection work only.

2. Project related miscellaneous expenses including vehicle, mileage, supplies, cellphones, printing, shipping, travel.... etc. are INCLUDED in the above Rates.

3. Inspectors are fully equipped with vehicles, computers, tools, and equipment required to perform their tasks.

4. Cost proposal is subject to prevailing wage rates for inspection.

5. Billing rates are based on actual hours worked.

6. Holiday, if applicable, are paid at 1.7 times above the rates for applicable classifications, and as agreed by the client.

7. Attached are Rate Schedules for Subconsultants (Materials Testing and Source Inspection).

Role Hourly Rate
Project Director $235
Project Manager / Construction Manager $205
Construction Managers / Resident Engineers / Structure Reps I $195 Construction Managers / Resident Engineers / Structure Reps II $210 Construction Inspector I $155
Construction Inspector II $165
Electrical Inspector / Traffic Signal Modifications $150 Landscape Architect / Inspector $155
SWPPP Compliance / Inspector $155
Welding Inspector $155
Office Engineer / Labor Compliance I $130
Office Engineer / Labor Compliance I $155
Project Controls / CPM Scheduling I $185
Project Controls / CPM Scheduling II $185
Public Relations / Community Outreach $130
Page | 50

CITY OF PICO RIVERA
On-Call Construction Management and
Inspection Services
(PR-RFP-036)
Page | 51

CITY OF PICO RIVERA
On-Call Construction Management and
Inspection Services
(PR-RFP-036)
Page | 52

CITY OF PICO RIVERA
On-Call Construction Management and
Inspection Services
(PR-RFP-036)
Appendix
53 APPENDIX C
NON‐COLLUSION AFFIDAVIT
The undersigned declares states and certifies that:

1. This Proposal is not made in the interest of, or on behalf of any undisclosed person, partnership, company, association, organization or corporation. This Proposal is genuine and not collusive or sham.

2. I have not directly or indirectly induced or solicited any other Proposer to put in a false or sham proposal and I have not directly or indirectly colluded, conspired, connived, or agreed with any other Proposer or anyone else to put in sham proposal or to refrain from submitting to this RFP.

3. I have not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the proposal price or to fix any overhead, profit or cost element of the proposal price or to secure any advantage against the City of Pico Rivera or of anyone interested in the proposed contract.

4. All statements contained in the Proposal and related documents are true.

5. I have not directly or indirectly submitted the proposal price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay any fee to any person, corporation, partnership, company, association, organization, RFP depository, or to any member or agent thereof to effectuate a collusive or sham proposal.

6. I have not entered into any arrangement or agreement with any City of Pico Rivera public officer in connection with this proposal.

7. I understand collusive bidding is a violation of State and Federal law and can result in fines, prison sentences, and civil damage awards.

Signature of Authorized Representative
Name of Authorized Representative Title of Authorized Representative Ivan Benavidez, Jr. Director

Professional Services Agreement

FOUNTAINHEAD CONSULTING CORPORATION

Page 16 of 19 ends
← All documents from this meeting