5. The parties may then, in order, respectively offer rebutting evidence only, unless the hearing officer for good reason, permits them to offer evidence upon their original case;
6. Closing arguments shall be permitted and written briefs may be permitted at the discretion of the hearing officer.
c. The hearing officer shall determine relevancy, weight, and credibility of testimony and evidence. He/she shall base his/her findings on the preponderance of evidence. During the examination of a witness, all other witnesses, except the parties, shall be excluded from the hearing unless the hearing officer, in his/her discretion, for good cause, otherwise directs. No still photographs, moving pictures, or television pictures shall be taken in the hearing chamber during a hearing. The hearing officer, prior to or during a hearing, may grant a continuance for any reason he/she believes to be important to reaching a fair and proper decision. The hearing officer shall render his/her judgment as soon after the conclusion of the hearing as possible and in no event later than thirty (30) days after conducting the hearing. His/her decision shall set forth which charges, if any, are sustained and the reasons therefore. The opinion shall set forth findings of fact and conclusions. d. The hearing officer may recommend sustaining or rejecting any or all of the charges filed against the employee. He/she may recommend sustaining, rejecting, or modifying the disciplinary action invoked against the employee. He/she may not recommend discipline more stringent than that issued by the City Manager.
Redlands Regular Meeting of 06-20-2023 940 of 1523
City of Redlands | RAMME MOU 2023-2026
RAMME Approval _____
20 e. The hearing officer’s opinion and recommendation shall be filed with the City Council, with a copy sent to the charged employee, and shall set forth his/her findings and recommendations.
If it is a dismissal hearing and a dismissal is not the hearing officer’s recommendation, the opinion shall set forth the date the employee is recommended to be reinstated and/or other recommended action. The reinstatement date, if appropriate, may be any time on or after the date of disciplinary action.
f. Within sixty (60) days of the receipt of the hearing officer’s findings, recommendation, and transcript, the City Council shall adopt, amend, modify or reject the recommended findings, conclusions, and/or opinions of the hearing officer. Prior to making a decision which modifies or rejects the recommendation of the hearing officer, the City Council shall order and read the transcript of the hearing. Prior to making a decision which supports the hearing officer, the City Council may order and read the transcript, at its option. The City Council shall not conduct a de novo hearing. The City Council may, at its option, allow limited oral arguments and/or may request and review written statements from either side. The decision of the City Council shall be final and conclusive. Copies of the City Council’s decision, including the hearing officer’s recommendation(s), shall be filed where appropriate, including the employee’s personnel file, unless no discipline is upheld by the City Council. g. Each party shall equally bear the cost and fees of the hearing officer, the cost of facilities, the court reporter and transcripts. Each party shall bear its own witness and attorney fees. If either party unilaterally cancels or postpones a scheduled hearing, thereby resulting in a fee charged by the hearing officer or court reporter, then the party responsible for the cancellation or postponement shall be solely responsible for payment of that fee. This process shall not apply to mutual settlements by the parties which result in a hearing officer fee. h. In the case of suspension, demotion, reduction in salary, or dismissal prescribed by the City Council, the time of such suspension, demotion or dismissal shall be effective from the first day after such delivery of said decision or shall relate back to and be effective as of the date the employee was disciplined pending hearing before and decision by the City Council, whichever is applicable. If discipline imposed resulted in loss of pay, and the decision results in reduction or elimination of loss of pay, the pay loss shall be restored to the employee based on the number of standard work hours lost computed at his/her then base hourly rate. i. The provisions of Section 1094.6 of the Code of Civil Procedure shall be applicable to proceedings under this Section.
Article 37. GRIEVANCE PROCEDURE
A. Definition
A “grievance” is a formal, written allegation by a grievant that he/she has been adversely affected by an existing violation, misinterpretation or misapplication of the specific provisions of the Memorandum of Understanding, provisions of the Personnel Rules and Regulations, and/or written City Policy. Other matters for which a special method of review is provided by law, ordinance, resolution, or by administrative regulations and procedures of the City, are not within the scope of this procedure. This procedure is not to be used in lieu of the Disciplinary Appeal Procedure set forth.
Redlands Regular Meeting of 06-20-2023 941 of 1523
City of Redlands | RAMME MOU 2023-2026
RAMME Approval _____
21 B. Procedure
1. Every effort shall be made to resolve a grievance through discussion between the employee and his/her immediate supervisor. It is the spirit and intent of this procedure that all grievances are settled quickly and fairly without subsequent discrimination against employees who may seek to adjust a grievance. Every effort should be made to find an acceptable solution at the lowest level of supervision. Within fifteen (15) days2 after a grievant knew, or by reasonable diligence should have known, of the condition upon which a grievance may be based, the grievant shall attempt to resolve it by an informal conference with the grievant’s immediate supervisor. A supervisor shall render a verbal decision within seven (7) days of the conclusion of the informal conference.
2. If the problem cannot be resolved between the employee and the supervisor, the employee may, within seven (7) days from the date of receiving the answer from his/her supervisor, file a written grievance and request a meeting with the Division Manager, if one exists, in order to discuss the grievance. The written grievance shall contain the following information:
a. Name of grievant and job title;
b. Department/Section;
c. Clear and concise statement of the nature of the grievance including the circumstances and dates involved;
d. The specific provision(s) of the MOU, City Policy or Personnel rules alleged to have been violated;
e. Requested remedy;
f. Name of the grievant’s Labor Representative, if any; and g. Date and signature of the grievant or Labor Representative.
3. The Division Manager shall render a decision and comments in writing and return them to the grievant within ten (10) days after receiving the written grievance.
4. If the Division Manager and employee cannot reach a solution to the grievance (or if a Division Manager does not exist), the employee may, within seven (7) days from the date of receiving the answer from the Division Manager, request, in writing, a meeting with the Department Head.
5. The Department Head shall render his/her decision in writing within fifteen (15) days of receiving the appeal. If the Department Head and employee are unable to arrive at a satisfactory solution, the employee may, within ten (10) days from the date of the decision by the Department Head, submit a written appeal to the Human Resources Director.
6. The City Manager shall review the grievance and respond to the employee within twenty (20) days of receiving the appeal. The response shall be in writing.
7. An employee desiring to appeal the City Manager's decision shall have ten (10) days after receipt of the response to file an appeal. The employee’s request for appeal must be addressed to the 2 Days refer to calendar days.
Redlands Regular Meeting of 06-20-2023 942 of 1523
City of Redlands | RAMME MOU 2023-2026
RAMME Approval _____
22 Human Resources Director and received in the Human Resources office so that same is date stamped by the Human Resources office within the ten (10) day period.
8. If, within the 10-day appeal period, the employee involved does not file said appeal, unless good cause for the failure is shown, the grievance shall be considered conclusive as set forth in the City Manager's decision and shall take effect as prescribed. If within the ten (10) day appeal period, the employee involved files such notice of appeal by giving written notice of appeal to the Human Resources Director, an appeal hearing shall be established as follows:
a. The California State Mediation and Conciliation Service shall be requested to submit a list of seven (7) persons qualified to act as hearing officers to the City and the employee. Within ten (10) days following receipt of the list of hearing officers, the parties shall confer to select the hearing officer. The parties shall alternately strike one (1) name from the list of hearing officers (the right to strike the first name to be determined by lot) until one (1) name remains, and that person shall be the hearing officer.
b. Where practicable, the date for a hearing shall not be less than twenty (20) days, nor more than sixty (60) days, from the date of the filing of the appeal with the Human Resources Director. The parties may stipulate to a longer or shorter period of time in which to hear the appeal. All interested parties shall be notified in writing of the date, time, and place of hearing. c. All hearings shall be private provided, however, that the hearing officer shall, at the request of the grievant, open the hearing to the public.
d. Subpoenas and subpoenas duces tecum pertaining to a hearing shall be issued at the request of either party, not less than seven (7) days, prior to the commencement of such hearing.
After the commencement of such hearing, subpoenas shall be issued only at the discretion of the hearing officer.
e. The hearing need not be conducted in accordance with technical rules relating to evidence and witnesses. Any relevant evidence shall be admitted if it is the sort of evidence on which reasonable persons are accustomed to rely in the conduct of serious affairs, regardless of the existence of any common law or statutory rules which might make improper admission of such evidence over objection in civil actions. Hearsay evidence may be used for the purpose of supplementing or explaining any direct evidence but shall not be sufficient in itself to support a finding unless it would be admissible over objection in civil actions. The rules of privilege shall be effective to the same extent that they are now or hereafter may be recognized in civil actions, and irrelevant and unduly repetitious evidence shall be excluded. The hearing officer shall not be bound by technical rules of evidence. The hearing officer shall rule on the admission or exclusion of evidence.
f. Each party shall have these rights: To be represented by legal counsel or other person of his/her choice; to call and examine witnesses; to introduce evidence; to cross-examine opposing witnesses on any matter relevant to the issues even though that matter was not covered in the direct examination; to impeach any witness regardless of which party first called him/her to testify; and to rebut the evidence against him/her. If the grievant does not testify in his/her own behalf, he/she may be called and examined as if under crossexamination. Oral evidence shall be taken only on oath or affirmation. A court reporter will be engaged to record the hearing, unless the parties (City, hearing officer, employee/employee representative) mutually agree that same is not necessary.
Redlands Regular Meeting of 06-20-2023 943 of 1523
City of Redlands | RAMME MOU 2023-2026
RAMME Approval _____
23 g. The hearing shall proceed in the following order, unless the hearing officer, for special reason, otherwise directs:
i. The grievant shall be permitted to make an opening statement; ii. The City shall then be permitted to make an opening statement; iii. The grievant shall produce the evidence on his/her part; the grievant bears the burden of proof and burden of producing evidence;
iv. The City may then open its defense and offer its evidence in support thereof; the City bears the burden of proof and the burden of producing evidence for any affirmative defenses asserted;
v. The parties may then, in order, respectively offer rebutting evidence only, unless the hearing officer for good reason, permits them to offer evidence upon their original case; vi. Closing arguments shall be permitted and written briefs may be permitted at the discretion of the hearing officer.
h. The hearing officer shall determine relevancy, weight, and credibility of testimony and evidence. He/she shall base his/her findings on the preponderance of evidence. During the examination of a witness, all other witnesses, except the parties, shall be excluded from the hearing unless the hearing officer, in his/her discretion, for good cause, otherwise directs. No still photographs, moving pictures, or television pictures shall be taken in the hearing chamber during a hearing. The hearing officer, prior to or during a hearing, may grant a continuance for any reason he/she believes to be important to reaching a fair and proper decision. The hearing officer shall render his/her judgment as soon after the conclusion of the hearing as possible and in no event later than thirty (30) days after conducting the hearing. The opinion shall set forth findings of fact and conclusions.
i. The hearing officer may recommend sustaining or rejecting any or all of the grievance. j. The hearing officer’s opinion and recommendation shall be filed with the Human Resources Director, with a copy sent to the grievant, and shall set forth his/her findings and recommendations.
k. Within sixty (60) days of the receipt of the hearing officer’s findings recommendation, and transcript, the City Council shall adopt, amend, modify or reject the recommended findings, conclusions, and/or opinions of the hearing officer. Prior to making a decision which modifies or rejects the recommendation of the hearing officer, the City Council shall order and read the transcript of the hearing. Prior to making a decision which supports the hearing officer, the City Council may order and read the transcript, at its option. The City Council shall not conduct a de novo hearing. The City Council may, at its option, allow limited oral arguments and/or may request and review written statements from either side. The decision of the City Council shall be final and conclusive. Copies of the City Council’s decision, including the hearing officer’s recommendation(s) shall be filed where appropriate, including the grievant's personnel file.
l. Each party shall bear equally the cost of facilities, fees and expenses of the hearing officer, including the court reporter and transcripts. Each party shall bear its own witness and attorney fees. If either party unilaterally cancels or postpones a scheduled hearing, thereby resulting in a fee charged by the hearing officer or court reporter, then the party responsible for the cancellation or postponement shall be solely responsible for payment of that fee. This process shall not apply to mutual settlements by the parties which result in an arbitration fee.
Redlands Regular Meeting of 06-20-2023 944 of 1523
City of Redlands | RAMME MOU 2023-2026
RAMME Approval _____
24 m. The provisions of Section 1094.6 of the Code of Civil Procedure shall be applicable to proceedings under this Section.
9. If the time limits for employees’ appeals at any step should elapse, the grievance shall be considered withdrawn. Time limits may be extended by mutual consent. If the City fails to respond within the prescribed time limits, the grievance will be deemed to have been denied and the employee may go to the next step. If the City Manager fails to respond within the prescribed time limit, the grievance will be deemed to have been denied and the employee will be deemed to have exhausted his/her administrative remedy.
10. The employee may request the assistance of another person of his/her own choosing in preparing and presenting his/her grievance at any level of review. In the event the employee desires the presence of a representative who is an employee of the City, he/she shall make such request through the supervisor and the supervisor shall make the necessary arrangements for the employee representative to be present.
11. The employee and/or his/her representative may use a reasonable amount of work time as determined by the appropriate supervisor or Department Head in presenting the grievance.
However, no employee shall absent himself/herself without first being excused by his/her supervisor.
12. No employee shall be required to be represented by an employee organization in processing a grievance.
13. Employees shall be assured freedom from reprisal for using the grievance procedures by both the City and the employee organization.
14. The settlement terms of a grievance which is processed by an employee individually or by a recognized employee organization shall not conflict with the express provisions of a Memorandum of Understanding between the City and the formally recognized employee organization for such unit.
15. A group grievance may be filed when one (1) set of circumstances or occurrences affects more than one (1) employee in the same manner or to the same extent. The group may file one (1) document which all members of the group have read and signed. Members of the group shall be limited to those who have signed the grievance. The resolution of a group grievance may not be consistent among all employees in the group grievance due to differences in the circumstances or occurrences that brought about the grievance.
16. A group grievance affecting all members of an employee organization may be brought by the employee organization itself. In such case the procedure shall be commenced directly at the City Manager level within fifteen (15) days after authorized representatives of the employee organization knew, or by reasonable diligence should have known, of the condition giving rise to the grievance and shall be subject to all applicable time limitations and the provisions set forth above.
Redlands Regular Meeting of 06-20-2023 945 of 1523
City of Redlands | RAMME MOU 2023-2026
RAMME Approval _____
25 Article 38. LAYOFF PROCEDURE
A. Should the City Manager determine reductions in force to be necessary due to lack of work or for financial reasons, he/she may initiate Layoffs. Classifications to be affected and the number of Unit employees included will be determined by the City.
B. In determining the order of Layoffs, a combination of factors shall be considered, including but not limited to: qualifications, productivity, general performance, seniority with the City of Redlands, seniority in job classification, and needs of the City. Variations from the order of Layoffs and recall from Layoff may occur when the City deems such variations appropriate under the circumstances.
C. The factors the City, in its discretion, may use to determine include but are not limited to the following:
1. An employee's last four performance evaluations, if any;
2. Any history of employee commendations, awards, etc.;
3. Any history of employee disciplinary action;
4. Attendance record, including tardiness and unexcused absences;
5. Safety record, including personal injury and damage to city property;
6. Probationary and temporary employees shall be laid off before a regular employee in the same classification;
7. Between two regular appointees in the same classification with the same skills, abilities, qualifications, merit and/or record, the employee with lesser seniority in the classification may be laid off first;
8. Between two regular appointees in the same classification the employee with lesser skills, abilities, qualifications, merit and\or record than may be laid off first, without regard to seniority;
9. Memoranda of Understanding ("MOU") between the City and effected bargaining units.
D. BUMPING
1. “Bumping” means the displacement of an employee from his/her position by an employee in a higher classification who formerly held the same position.
2. Where two or more employees are laid off from the same position, the employee with the greatest seniority in that classification shall have the first opportunity to bump as set forth below.
3. A laid-off employee shall be entitled to bump an employee in the same position previously held by the laid off employee. Alternatively, an employee may "bump" into a position in a different department which he/she held within the prior five (5) years. The laid off employee must be able to perform the essential job functions of the former position and possess the minimum qualifications of the position as specified by the job classification specification. A laid-off employee shall not bump an employee with greater skills, abilities, qualifications, merit and/or record. Laid off employees may also be placed in a vacant lower classification for which they meet the minimum qualifications. Employees must utilize the option that places them in the highest available position.
4. The City will notify laid-off employees of any positions available for bumping. Following such notification, the employee must notify the Human Resources Director in writing of his/her intent to exercise the bumping rights within seven (7) calendar days, and the position and classification in to which he/she intends to bump. Failure to provide such notification will be deemed a waiver of bumping rights by the employee.
Redlands Regular Meeting of 06-20-2023 946 of 1523
City of Redlands | RAMME MOU 2023-2026
RAMME Approval _____
26 5. Where there is more than one employee in a position available for bumping, the factors in paragraph C of this Section, will be used to determine which employee, if any, will be bumped.
6. The process will be repeated at the next classification level where an employee bumps in and creates an overage in that classification.
7. Any displaced employee shall be considered as laid-off for the same reason as the person who displaced them and shall in the same manner be eligible to displace another employee based on the criteria specified in paragraph C of this Section.
E. REINSTATEMENT FROM LAYOFF
1. The names of probationary and regular employees who have been laid off shall be placed on appropriate reemployment lists. Such names shall remain thereon for a period of one year unless such persons are sooner reemployed.
2. When a reemployment list is to be used to fill vacancies, the Human Resources Director shall certify from such lists the number of names equal to the number of vacancies. An employee who is reemployed shall receive credit for former service for purposes of seniority, benefit compensation, and salary advancement.
Employees who are laid off from City employment, may be reinstated within one year of the date of layoff upon the recommendation of the Department Head and with the approval of the Human Resources Director, to the position from which they were laid off based on their qualifications, availability, and the needs of the organization pursuant to this paragraph.
Article 39. ZIPPER CLAUSE
The City and the Unit agree that all negotiable items have been discussed during the negotiations leading to this MOU, including salaries and benefits, and conditions of employment, and therefore the City and the Unit further agree that negotiations will not be reopened on any item during the term of this MOU, except by mutual agreement of the City and the Unit, or as expressly provided otherwise in this MOU.
CITY OF REDLANDS
REDLANDS ASSOCIATION OF
MID-MANAGEMENT EMPLOYEES - RAMME
EDDIE TEJEDA, MAYOR PRESIDENT, MICHAEL FOSTER DATE
ADOPTED, SIGNED AND APPROVED
THIS 20 TH DAY OF, 2023
VICE PRESIDENT, KEVIN JOHNSTON DATE
ATTEST:
_______________________________________
JEANNE DONALDSON, CITY CLERK
Redlands Regular Meeting of 06-20-2023 947 of 1523
Employee Units Included:
Redlands Professional Police Officers Association
Redlands Association of Safety Management Employees
City of Redlands
SALARY SCHEDULE
Title Range Rate Type 0
(Minimum)
1 2 3 4 5
(Longevity)
6 (Longevity)
Police Officer P60 HOURLY 35.166 36.924 38.770 40.709 42.744 44.881 46.228 MONTHLY 6095 6400 6720 7056 7409 7779 8013
ANNUAL 73145 76802 80642 84674 88908 93353 96154
Police Corporal P64 HOURLY 39.708 41.693 43.778 45.967 48.265 50.679 52.199 MONTHLY 6883 7227 7588 7968 8366 8784 9048
ANNUAL 82593 86722 91059 95611 100392 105412 108574
Police Sergeant P70 HOURLY 47.350 49.717 52.203 54.813 57.554 60.432 62.244 MONTHLY 8207 8618 9049 9501 9976 10475 10789
ANNUAL 98487 103412 108582 114011 119712 125698 129469
Police Commander P81 HOURLY 69.534 73.011 76.661 80.495 84.519 88.745 MONTHLY 12053 12655 13288 13952 14650 15383
ANNUAL 144631 151863 159456 167429 175800 184590
Deputy Chief P85 HOURLY 78.780 82.719 86.855 91.198 95.758 100.546 MONTHLY 13655 14338 15055 15808 16598 17428
ANNUAL 163863 172056 180659 189691 199176 209135
Effective July 2023
*Due to rounding, salary schedules are close approximations of actual salary Redlands Regular Meeting of 06-20-2023 948 of 1523
Emplolyee Units Included:
Redlands Association of Mid-Management Employees
City of Redlands
SALARY SCHEDULE
Range FLSA
Status Rate Type 0
(Minimum)
1 2 3 4 5
(Longevity Only)
6 (Longevity Only)
MM27 E HOURLY 30.233 31.745 33.332 34.998 36.748 37.851 38.608 MONTHLY 5240 5502 5778 6066 6370 6561 6692
ANNUAL 62885 66029 69330 72797 76437 78730 80304
MM28 E HOURLY 30.535 32.062 33.665 35.348 37.116 38.229 38.994 MONTHLY 5293 5557 5835 6127 6433 6626 6759
ANNUAL 63513 66689 70023 73525 77201 79517 81107
MM29 E HOURLY 30.841 32.383 34.002 35.702 37.487 38.612 39.384 MONTHLY 5346 5613 5894 6188 6498 6693 6827
ANNUAL 64148 67356 70724 74260 77973 80312 81918
MM30 E HOURLY 31.149 32.706 34.342 36.059 37.862 38.998 39.778 MONTHLY 5399 5669 5953 6250 6563 6760 6895
ANNUAL 64790 68029 71431 75002 78753 81115 82738
MM31 E HOURLY 31.461 33.034 34.685 36.419 38.240 39.388 40.175 MONTHLY 5453 5726 6012 6313 6628 6827 6964
ANNUAL 65438 68710 72145 75753 79540 81926 83565
MM32 E HOURLY 31.775 33.364 35.032 36.784 38.623 39.782 40.577 MONTHLY 5508 5783 6072 6376 6695 6895 7033
ANNUAL 66092 69397 72867 76510 80336 82746 84401
MM33 E HOURLY 32.093 33.698 35.382 37.152 39.009 40.179 40.983 MONTHLY 5563 5841 6133 6440 6762 6964 7104
ANNUAL 66753 70091 73595 77275 81139 83573 85245
MM34 E HOURLY 32.414 34.034 35.736 37.523 39.399 40.581 41.393 MONTHLY 5618 5899 6194 6504 6829 7034 7175
ANNUAL 67421 70792 74331 78048 81950 84409 86097
MM35 E HOURLY 32.738 34.375 36.094 37.898 39.793 40.987 41.807 MONTHLY 5675 5958 6256 6569 6897 7104 7246
ANNUAL 68095 71500 75075 78828 82770 85253 86958
MM36 E HOURLY 33.065 34.719 36.455 38.277 40.191 41.397 42.225 MONTHLY 5731 6018 6319 6635 6966 7175 7319
ANNUAL 68776 72215 75825 79617 83597 86105 87828
MM37 E HOURLY 33.396 35.066 36.819 38.660 40.593 41.811 42.647 MONTHLY 5789 6078 6382 6701 7036 7247 7392
ANNUAL 69464 72937 76584 80413 84433 86966 88706
MM38 E HOURLY 33.730 35.416 37.187 39.047 40.999 42.229 43.073 MONTHLY 5847 6139 6446 6768 7106 7320 7466
ANNUAL 70158 73666 77349 81217 85278 87836 89593
MM39 E HOURLY 34.067 35.771 37.559 39.437 41.409 42.651 43.504 MONTHLY 5905 6200 6510 6836 7178 7393 7541
ANNUAL 70860 74403 78123 82029 86131 88715 90489
MM40 E HOURLY 34.408 36.128 37.935 39.831 41.823 43.078 43.939 MONTHLY 5964 6262 6575 6904 7249 7467 7616
ANNUAL 71568 75147 78904 82849 86992 89602 91394
MM41 E HOURLY 34.752 36.490 38.314 40.230 42.241 43.508 44.379 MONTHLY 6024 6325 6641 6973 7322 7541 7692
ANNUAL 72284 75898 79693 83678 87862 90498 92308
MM42 E HOURLY 35.100 36.854 38.697 40.632 42.664 43.944 44.822 MONTHLY 6084 6388 6708 7043 7395 7617 7769
ANNUAL 73007 76657 80490 84515 88740 91403 93231
MM43 E HOURLY 35.450 37.223 39.084 41.038 43.090 44.383 45.271 MONTHLY 6145 6452 6775 7113 7469 7693 7847
ANNUAL 73737 77424 81295 85360 89628 92317 94163
Effective July 2023 *Due to rounding, salary schedules are a close approximation of actual salary.
Redlands Regular Meeting of 06-20-2023 949 of 1523
Emplolyee Units Included:
Redlands Association of Mid-Management Employees
City of Redlands
SALARY SCHEDULE
Range FLSA
Status Rate Type 0
(Minimum)
1 2 3 4 5
(Longevity Only)
6 (Longevity Only)
MM44 E HOURLY 35.805 37.595 39.475 41.449 43.521 44.827 45.723 MONTHLY 6206 6517 6842 7184 7544 7770 7925
ANNUAL 74474 78198 82108 86213 90524 93240 95105
MM45 E HOURLY 36.163 37.971 39.870 41.863 43.956 45.275 46.181 MONTHLY 6268 6582 6911 7256 7619 7848 8005
ANNUAL 75219 78980 82929 87076 91429 94172 96056
MM46 E HOURLY 36.525 38.351 40.268 42.282 44.396 45.728 46.642 MONTHLY 6331 6647 6980 7329 7695 7926 8085
ANNUAL 75971 79770 83758 87946 92344 95114 97016
MM47 E HOURLY 36.890 38.734 40.671 42.705 44.840 46.185 47.109 MONTHLY 6394 6714 7050 7402 7772 8005 8166
ANNUAL 76731 80568 84596 88826 93267 96065 97986
MM48 E HOURLY 37.259 39.122 41.078 43.132 45.288 46.647 47.580 MONTHLY 6458 6781 7120 7476 7850 8085 8247
ANNUAL 77498 81373 85442 89714 94200 97026 98966
MM49 E HOURLY 37.631 39.513 41.489 43.563 45.741 47.113 48.056 MONTHLY 6523 6849 7191 7551 7928 8166 8330
ANNUAL 78273 82187 86296 90611 95142 97996 99956
MM50 E HOURLY 38.008 39.908 41.904 43.999 46.199 47.585 48.536 MONTHLY 6588 6917 7263 7626 8008 8248 8413
ANNUAL 79056 83009 87159 91517 96093 98976 100955
MM51 E HOURLY 38.388 40.307 42.323 44.439 46.661 48.060 49.022 MONTHLY 6654 6987 7336 7703 8088 8330 8497
ANNUAL 79847 83839 88031 92432 97054 99966 101965
MM52 E HOURLY 38.772 40.710 42.746 44.883 47.127 48.541 49.512 MONTHLY 6720 7056 7409 7780 8169 8414 8582
ANNUAL 80645 84677 88911 93357 98025 100965 102985
MM53 E HOURLY 39.159 41.117 43.173 45.332 47.599 49.026 50.007 MONTHLY 6788 7127 7483 7858 8250 8498 8668
ANNUAL 81452 85524 89800 94290 99005 101975 104015
MM54 E HOURLY 39.551 41.529 43.605 45.785 48.074 49.517 50.507 MONTHLY 6856 7198 7558 7936 8333 8583 8755
ANNUAL 82266 86379 90698 95233 99995 102995 105055
MM55 E HOURLY 39.947 41.944 44.041 46.243 48.555 50.012 51.012 MONTHLY 6924 7270 7634 8015 8416 8669 8842
ANNUAL 83089 87243 91605 96186 100995 104025 106105
MM56 E HOURLY 40.346 42.363 44.481 46.706 49.041 50.512 51.522 MONTHLY 6993 7343 7710 8096 8500 8755 8931
ANNUAL 83920 88116 92521 97147 102005 105065 107166
MM57 E HOURLY 40.749 42.787 44.926 47.173 49.531 51.017 52.037 MONTHLY 7063 7416 7787 8177 8585 8843 9020
ANNUAL 84759 88997 93447 98119 103025 106116 108238
MM58 E HOURLY 41.157 43.215 45.376 47.644 50.027 51.527 52.558 MONTHLY 7134 7491 7865 8258 8671 8931 9110
ANNUAL 85606 89887 94381 99100 104055 107177 109320
MM59 E HOURLY 41.568 43.647 45.829 48.121 50.527 52.043 53.083 MONTHLY 7205 7565 7944 8341 8758 9021 9201
ANNUAL 86462 90786 95325 100091 105096 108249 110414
MM60 E HOURLY 41.984 44.083 46.288 48.602 51.032 52.563 53.614 MONTHLY 7277 7641 8023 8424 8846 9111 9293
ANNUAL 87327 91693 96278 101092 106147 109331 111518
Effective July 2023 *Due to rounding, salary schedules are a close approximation of actual salary.
Redlands Regular Meeting of 06-20-2023 950 of 1523
Emplolyee Units Included:
Redlands Association of Mid-Management Employees
City of Redlands
SALARY SCHEDULE
Range FLSA
Status Rate Type 0
(Minimum)
1 2 3 4 5
(Longevity Only)
6 (Longevity Only)
MM61 E HOURLY 42.404 44.524 46.750 49.088 51.542 53.089 54.150 MONTHLY 7350 7718 8103 8509 8934 9202 9386
ANNUAL 88200 92610 97241 102103 107208 110424 112633
MM62 E HOURLY 42.828 44.969 47.218 49.579 52.058 53.620 54.692 MONTHLY 7424 7795 8184 8594 9023 9294 9480
ANNUAL 89082 93536 98213 103124 108280 111529 113759
MM63 E HOURLY 43.256 45.419 47.690 50.075 52.578 54.156 55.239 MONTHLY 7498 7873 8266 8680 9114 9387 9575
ANNUAL 89973 94472 99195 104155 109363 112644 114897
MM64 E HOURLY 43.689 45.873 48.167 50.575 53.104 54.697 55.791 MONTHLY 7573 7951 8349 8766 9205 9481 9670
ANNUAL 90873 95417 100187 105197 110457 113770 116046
MM65 E HOURLY 44.126 46.332 48.649 51.081 53.635 55.244 56.349 MONTHLY 7648 8031 8432 8854 9297 9576 9767
ANNUAL 91782 96371 101189 106249 111561 114908 117206
MM66 E HOURLY 44.567 46.795 49.135 51.592 54.172 55.797 56.913 MONTHLY 7725 8111 8517 8943 9390 9671 9865
ANNUAL 92699 97334 102201 107311 112677 116057 118378
MM67 E HOURLY 45.013 47.263 49.627 52.108 54.713 56.355 57.482 MONTHLY 7802 8192 8602 9032 9484 9768 9964
ANNUAL 93626 98308 103223 108384 113804 117218 119562
MM68 E HOURLY 45.463 47.736 50.123 52.629 55.260 56.918 58.057 MONTHLY 7880 8274 8688 9122 9578 9866 10063
ANNUAL 94563 99291 104255 109468 114942 118390 120758
MM69 E HOURLY 45.917 48.213 50.624 53.155 55.813 57.487 58.637 MONTHLY 7959 8357 8775 9214 9674 9964 10164
ANNUAL 95508 100284 105298 110563 116091 119574 121965
MM70 E HOURLY 46.377 48.695 51.130 53.687 56.371 58.062 59.223 MONTHLY 8039 8441 8863 9306 9771 10064 10265
ANNUAL 96463 101287 106351 111668 117252 120769 123185
MM71 E HOURLY 46.840 49.182 51.642 54.224 56.935 58.643 59.816 MONTHLY 8119 8525 8951 9399 9869 10165 10368
ANNUAL 97428 102299 107414 112785 118424 121977 124417
MM72 E HOURLY 47.309 49.674 52.158 54.766 57.504 59.229 60.414 MONTHLY 8200 8610 9041 9493 9967 10266 10472
ANNUAL 98402 103322 108489 113913 119609 123197 125661
MM73 E HOURLY 47.782 50.171 52.680 55.314 58.079 59.822 61.018 MONTHLY 8282 8696 9131 9588 10067 10369 10576
ANNUAL 99386 104356 109573 115052 120805 124429 126917
MM74 E HOURLY 48.260 50.673 53.206 55.867 58.660 60.420 61.628 MONTHLY 8365 8783 9222 9684 10168 10473 10682
ANNUAL 100380 105399 110669 116203 122013 125673 128187 MM75 E HOURLY 48.742 51.179 53.738 56.425 59.247 61.024 62.244 MONTHLY 8449 8871 9315 9780 10269 10577 10789
ANNUAL 101384 106453 111776 117365 123233 126930 129469 MM76 E HOURLY 49.230 51.691 54.276 56.990 59.839 61.634 62.867 MONTHLY 8533 8960 9408 9878 10372 10683 10897
ANNUAL 102398 107518 112894 118538 124465 128199 130763 MM77 E HOURLY 49.722 52.208 54.819 57.559 60.437 62.251 63.496 MONTHLY 8618 9049 9502 9977 10476 10790 11006
ANNUAL 103422 108593 114023 119724 125710 129481 132071 Effective July 2023 *Due to rounding, salary schedules are a close approximation of actual salary.
Redlands Regular Meeting of 06-20-2023 951 of 1523
Emplolyee Units Included:
Redlands Association of Mid-Management Employees
City of Redlands
SALARY SCHEDULE
Range FLSA
Status Rate Type 0
(Minimum)
1 2 3 4 5
(Longevity Only)
6 (Longevity Only)
MM78 E HOURLY 50.219 52.730 55.367 58.135 61.042 62.873 64.131 MONTHLY 8705 9140 9597 10077 10581 10898 11116
ANNUAL 104456 109679 115163 120921 126967 130776 133392 MM79 E HOURLY 50.721 53.258 55.920 58.716 61.652 63.502 64.772 MONTHLY 8792 9231 9693 10178 10686 11007 11227
ANNUAL 105501 110776 116314 122130 128237 132084 134725 MM80 E HOURLY 51.229 53.790 56.480 59.304 62.269 64.137 65.420 MONTHLY 8880 9324 9790 10279 10793 11117 11339
ANNUAL 106556 111883 117478 123351 129519 133405 136073 MM81 E HOURLY 51.741 54.328 57.044 59.897 62.891 64.778 66.074 MONTHLY 8968 9417 9888 10382 10901 11228 11453
ANNUAL 107621 113002 118652 124585 130814 134739 137433 MM82 E HOURLY 52.258 54.871 57.615 60.496 63.520 65.426 66.735 MONTHLY 9058 9511 9987 10486 11010 11341 11567
ANNUAL 108697 114132 119839 125831 132122 136086 138808 MM83 E HOURLY 52.781 55.420 58.191 61.101 64.156 66.080 67.402 MONTHLY 9149 9606 10086 10591 11120 11454 11683
ANNUAL 109784 115274 121037 127089 133444 137447 140196 MM84 E HOURLY 53.309 55.974 58.773 61.712 64.797 66.741 68.076 MONTHLY 9240 9702 10187 10697 11232 11568 11800
ANNUAL 110882 116426 122248 128360 134778 138821 141598 MM85 E HOURLY 53.842 56.534 59.361 62.329 65.445 67.408 68.757 MONTHLY 9333 9799 10289 10804 11344 11684 11918
ANNUAL 111991 117591 123470 129644 136126 140210 143014 MM86 E HOURLY 54.380 57.099 59.954 62.952 66.100 68.083 69.444 MONTHLY 9426 9897 10392 10912 11457 11801 12037
ANNUAL 113111 118767 124705 130940 137487 141612 144444 MM87 E HOURLY 54.924 57.670 60.554 63.581 66.761 68.763 70.139 MONTHLY 9520 9996 10496 11021 11572 11919 12157
ANNUAL 114242 119954 125952 132249 138862 143028 145888 MM88 E HOURLY 55.473 58.247 61.159 64.217 67.428 69.451 70.840 MONTHLY 9615 10096 10601 11131 11688 12038 12279
ANNUAL 115385 121154 127211 133572 140251 144458 147347 MM89 E HOURLY 56.028 58.829 61.771 64.859 68.102 70.146 71.548 MONTHLY 9712 10197 10707 11242 11804 12159 12402
ANNUAL 116538 122365 128484 134908 141653 145903 148821 MM90 E HOURLY 56.588 59.418 62.389 65.508 68.783 70.847 72.264 MONTHLY 9809 10299 10814 11355 11922 12280 12526
ANNUAL 117704 123589 129768 136257 143070 147362 150309 Effective July 2023 *Due to rounding, salary schedules are a close approximation of actual salary.
Redlands Regular Meeting of 06-20-2023 952 of 1523
Emplolyee Units Included:
Redlands Association of Management Employees
City of Redlands
SALARY SCHEDULE
Range FLSA
Status Rate Type 0 (Minimum) 1 2 3 4
5 (Longevity
Only)
6 (Longevity
Only)
M65 HOURLY 39.145 41.103 43.158 45.316 47.581 49.009 49.989 MONTHLY 6785 7124 7481 7855 8247.43 8495 8665
ANNUAL 81422 85493 89768 94256 98969 101938 103977
M66 HOURLY 40.124 42.130 44.237 46.448 48.771 50.234 51.239 MONTHLY 6955 7303 7668 8051 8454 8707 8881
ANNUAL 83458 87631 92012 96613 101443 104487 106576
M67 HOURLY 41.127 43.183 45.343 47.610 49.990 51.490 52.520 MONTHLY 7129 7485 7859 8252 8665 8925 9103
ANNUAL 85544 89821 94312 99028 103979 107099 109241
M68 HOURLY 42.155 44.263 46.476 48.800 51.240 52.777 53.833 MONTHLY 7307 7672 8056 8459 8882 9148 9331
ANNUAL 87683 92067 96670 101504 106579 109776 111972
M69 HOURLY 43.209 45.370 47.638 50.020 52.521 54.097 55.178 MONTHLY 7490 7864 8257 8670 9104 9377 9564
ANNUAL 89875 94369 99087 104041 109243 112521 114771
M70 HOURLY 44.289 46.504 48.829 51.270 53.834 55.449 56.558 MONTHLY 7677 8061 8464 8887 9331 9611 9803
ANNUAL 92122 96728 101564 106642 111975 115334 117640
M71 HOURLY 45.397 47.666 50.050 52.552 55.180 56.835 57.972 MONTHLY 7869 8262 8675 9109 9564 9851 10048
ANNUAL 94425 99146 104103 109308 114774 118217 120581
M72 HOURLY 46.531 48.858 51.301 53.866 56.559 58.256 59.421 MONTHLY 8065 8469 8892 9337 9804 10098 10300
ANNUAL 96785 101625 106706 112041 117643 121173 123596
M73 HOURLY 47.695 50.079 52.583 55.213 57.973 59.712 60.907 MONTHLY 8267 8680 9114 9570 10049 10350 10557
ANNUAL 99205 104165 109374 114842 120584 124202 126686
M74 HOURLY 48.887 51.331 53.898 56.593 59.423 61.205 62.429 MONTHLY 8474 8897 9342 9809 10300 10609 10821
ANNUAL 101685 106769 112108 117713 123599 127307 129853 M75 HOURLY 50.109 52.615 55.245 58.008 60.908 62.735 63.990 MONTHLY 8686 9120 9576 10055 10557 10874 11092
ANNUAL 104227 109439 114911 120656 126689 130490 133099 M76 HOURLY 51.362 53.930 56.627 59.458 62.431 64.304 65.590 MONTHLY 8903 9348 9815 10306 10821 11146 11369
ANNUAL 106833 112175 117783 123672 129856 133752 136427 Effective July 2023
4 of 14
*Due to rounding, salary schedules are close approximations of actual salary.
Redlands Regular Meeting of 06-20-2023 953 of 1523
Emplolyee Units Included:
Redlands Association of Management Employees
City of Redlands
SALARY SCHEDULE
Range FLSA
Status Rate Type 0 (Minimum) 1 2 3 4
5 (Longevity
Only)
6 (Longevity
Only)
M77 HOURLY 52.646 55.278 58.042 60.944 63.992 65.911 67.230 MONTHLY 9125 9582 10061 10564 11092 11425 11653
ANNUAL 109504 114979 120728 126764 133103 137096 139838 M78 HOURLY 53.962 56.660 59.493 62.468 65.591 67.559 68.910 MONTHLY 9353 9821 10312 10828 11369 11710 11944
ANNUAL 112241 117853 123746 129933 136430 140523 143333 M79 HOURLY 55.311 58.077 60.981 64.030 67.231 69.248 70.633 MONTHLY 9587 10067 10570 11098 11653 12003 12243
ANNUAL 115047 120800 126840 133182 139841 144036 146917 M80 HOURLY 56.694 59.529 62.505 65.630 68.912 70.979 72.399 MONTHLY 9827 10318 10834 11376 11945 12303 12549
ANNUAL 117924 123820 130011 136511 143337 147637 150590 M81 HOURLY 58.111 61.017 64.068 67.271 70.635 72.754 74.209 MONTHLY 10073 10576 11105 11660 12243 12611 12863
ANNUAL 120872 126915 133261 139924 146920 151328 154354 M82 HOURLY 59.564 62.542 65.669 68.953 72.401 74.573 76.064 MONTHLY 10324 10841 11383 11952 12549 12926 13184
ANNUAL 123893 130088 136593 143422 150593 155111 158213 M83 HOURLY 61.053 64.106 67.311 70.677 74.211 76.437 77.966 MONTHLY 10583 11112 11667 12251 12863 13249 13514
ANNUAL 126991 133340 140007 147008 154358 158989 162169 M84 HOURLY 62.580 65.709 68.994 72.444 76.066 78.348 79.915 MONTHLY 10847 11389 11959 12557 13185 13580 13852
ANNUAL 130166 136674 143508 150683 158217 162964 166223 M85 HOURLY 64.144 67.351 70.719 74.255 77.968 80.307 81.913 MONTHLY 11118 11674 12258 12871 13514 13920 14198
ANNUAL 133420 140091 147095 154450 162172 167038 170378 M86 HOURLY 65.748 69.035 72.487 76.111 79.917 82.314 83.961 MONTHLY 11396 11966 12564 13193 13852 14268 14553
ANNUAL 136755 143593 150773 158311 166227 171214 174638 M87 HOURLY 67.391 70.761 74.299 78.014 81.915 84.372 86.060 MONTHLY 11681 12265 12878 13522 14199 14624 14917
ANNUAL 140174 147183 154542 162269 170382 175494 179004 M88 HOURLY 69.076 72.530 76.156 79.964 83.963 86.481 88.211 MONTHLY 11973 12572 13200 13860 14554 14990 15290
ANNUAL 143678 150862 158405 166326 174642 179881 183479 Effective July 2023
5 of 14
*Due to rounding, salary schedules are close approximations of actual salary.
Redlands Regular Meeting of 06-20-2023 954 of 1523
Emplolyee Units Included:
Redlands Association of Management Employees
City of Redlands
SALARY SCHEDULE
Range FLSA
Status Rate Type 0 (Minimum) 1 2 3 4
5 (Longevity
Only)
6 (Longevity
Only)
M89 HOURLY 70.803 74.343 78.060 81.963 86.062 88.643 90.416 MONTHLY 12273 12886 13530 14207 14917 15365 15672
ANNUAL 147270 154634 162366 170484 179008 184378 188066 M90 HOURLY 72.573 76.202 80.012 84.012 88.213 90.860 92.677 MONTHLY 12579 13208 13869 14562 15290 15749 16064
ANNUAL 150952 158500 166425 174746 183483 188988 192768 M91 HOURLY 74.387 78.107 82.012 86.113 90.418 93.131 94.994 MONTHLY 12894 13539 14215 14926 15673 16143 16466
ANNUAL 154726 162462 170585 179115 188070 193712 197587 M92 HOURLY 76.247 80.060 84.063 88.266 92.679 95.459 97.368 MONTHLY 13216 13877 14571 15299 16064 16546 16877
ANNUAL 158594 166524 174850 183593 192772 198555 202526 M93 HOURLY 78.153 82.061 86.164 90.472 94.996 97.846 99.803 MONTHLY 13547 14224 14935 15682 16466 16960 17299
ANNUAL 162559 170687 179221 188182 197591 203519 207590 M94 HOURLY 80.107 84.113 88.318 92.734 97.371 100.292 102.298 MONTHLY 13885 14580 15308 16074 16878 17384 17732
ANNUAL 166623 174954 183702 192887 202531 208607 212779 M95 HOURLY 82.110 86.215 90.526 95.052 99.805 102.799 104.855 MONTHLY 14232 14944 15691 16476 17300 17819 18175
ANNUAL 170789 179328 188294 197709 207595 213822 218099 M96 HOURLY 84.163 88.371 92.789 97.429 102.300 105.369 107.477 MONTHLY 14588 15318 16083 16888 17732 18264 18629
ANNUAL 175058 183811 193002 202652 212784 219168 223551 M97 HOURLY 86.267 90.580 95.109 99.864 104.858 108.003 110.163 MONTHLY 14953 15701 16486 17310 18175 18721 19095
ANNUAL 179435 188406 197827 207718 218104 224647 229140 M98 HOURLY 88.423 92.845 97.487 102.361 107.479 110.703 112.918 MONTHLY 15327 16093 16898 17743 18630 19189 19572
ANNUAL 183921 193117 202772 212911 223557 230263 234869 M99 HOURLY 90.634 95.166 99.924 104.920 110.166 113.471 115.741 MONTHLY 15710 16495 17320 18186 19095 19668 20062
ANNUAL 188519 197944 207842 218234 229145 236020 240740 M100 HOURLY 92.900 97.545 102.422 107.543 112.920 116.308 118.634 MONTHLY 16103 16908 17753 18641 19573 20160 20563
ANNUAL 193232 202893 213038 223690 234874 241920 246759 Effective July 2023
6 of 14
*Due to rounding, salary schedules are close approximations of actual salary.
Redlands Regular Meeting of 06-20-2023 955 of 1523
Employee Units Included:
Redlands Association of Department Directors
City of Redlands
SALARY SCHEDULE
Range
Minimum
Monthly Salary
Maximum
Monthly
Salary
04 - Director, Development Services 15,614 18,980
04 - Director, Management Services 15,614 18,980
04 - Director, Facilities and Community Services 15,614 18,980 05 - Director, Municipal Utilities and Engineering 16,405 19,941 05 - Assistant City Manager 16,405 19,941
06 - Fire Chief 17,300 23,000
07 - Police Chief 19,800 27,500
Department Director Salary Table (DD)
Effective: July 2023
Redlands Regular Meeting of 06-20-2023 956 of 1523
City Council Meeting K. 2.
DATE: 06/20/2023
TO: Honorable Mayor and City Council Members
SUBJECT: Consideration of the Fire Department's continued membership in the CONFIRE Joint Use Authority for Fiscal Year 2023-2024 and pay associated annual fees in an amount not to exceed $864,568 (Fire Chief Sessler)
MOTION(S):
If the City Council determines that staff’s recommendation is appropriate, the following motion is provided:
I move to approve the Fire Department's continued membership with the CONFIRE Joint Use Authority and pay the associated annual fees in an amount not to exceed $864,568.
RECOMMENDATION:
Staff recommends that the City Council approve the Redlands Fire Department's continued membership with the CONFIRE Joint Use Authority and pay the associated annual fees in an amount not to exceed $864,568.
DISCUSSION:
In August 1990, the City Council formally approved the membership of the Redlands Fire Department to join the cities of Colton, Loma Linda, Rialto, and the County of San Bernardino Consolidated Fire Agency to form CONFIRE. The primary function of CONFIRE is to provide for a secondary public safety answering point for 9-1-1 services, fire/emergency medical dispatching, and information technology support. While the CONFIRE Joint Use Authority (JPA) agreement will apply until such time as the City of Redlands elects to discontinue participation, staff requires authorization to pay the associated fees.
The projected annual service fee for Fiscal Year 2023-2024 is $864,568. This cost has been included in the Fire Department's budget.
Redlands Regular Meeting of 06-20-2023 957 of 1523
ALTERNATIVES:
Not authorize the continuance of the Redlands Fire Department as a member of the CONFIRE Joint Use Authority.
STRATEGIC PLAN:
Priority B - Public Health and Safety
SUBMITTED BY:
Rich Sessler, Fire Chief
RECOMMENDED BY:
Charles M. Duggan Jr., City Manager
REVIEWED BY:
Janice McConnell, Assistant City Manager
Danielle Garcia, Management Services/Finance Director
PREPARED BY:
Bruni Reyes, Management Analyst
Fiscal Impact
Fiscal Year: 2022-2023
Revenue Generating: N
Appropriation Required Y/N: N
Discussion:
The Confire JPA total annual fee for Fiscal Year 2023-2024 is $864,568.
Funding has been requested in the FY 2023-2024 Fire Department Budget to cover this cost.
Attachments
Confire Agreement
CONFIRE Accounts Receivable Spreadsheet
Redlands Regular Meeting of 06-20-2023 958 of 1523
Redlands Regular Meeting of 06-20-2023 959 of 1523
Redlands Regular Meeting of 06-20-2023 960 of 1523
Redlands Regular Meeting of 06-20-2023 961 of 1523
Redlands Regular Meeting of 06-20-2023 962 of 1523
Redlands Regular Meeting of 06-20-2023 963 of 1523
Redlands Regular Meeting of 06-20-2023 964 of 1523
Redlands Regular Meeting of 06-20-2023 965 of 1523
Redlands Regular Meeting of 06-20-2023 966 of 1523
Redlands Regular Meeting of 06-20-2023 967 of 1523
Department / District
% of Call
Volume
2021
% of Call
Volume
2022
Admin /
General
(100)
CAD / GIS
(200)
Desert
Dispatch
(300)
Valley
Dispatch
(400)
Valley
Dispatch
Seat
Based
XBO Chief
(400)
Total
Dispatch
(200-400)
MIS -
Universal
(600)
MIS SeatBased
(600)
MIS Total
(600)
ISD Radio
/ Pagers
& Pass
Thru (700)
Ambulance
Service
Revenue
(700)
Agency
Revenue for
Operating Fund
(5008)
Agency
Equipment
Replacement
(5009)
CONFIRE
Equipment
Replacement
(5009)
Total
Equipment
Replacement
(5009)
FY 2023/24
Total
Operating &
Equipment
Costs
(5008+5009)
5% Contract
Charge of
Total
Opererating
Costs (5011)
CAD to
CAD
Fund
(5019)
FY 2023/24
Total AR
from Agency
Apple Valley 5.31% 5.21% 75,073 66,181 140,619 252,989 25,946 485,735 76,676 77,419 154,095 -9,121 $ 705,781 5,203 23,876 29,079 $ 743,981 $ 734,860 Big Bear 1.67% 1.55% 22,303 19,661 41,775 75,158 7,708 144,302 22,779 70,773 93,552 57,066 -2,710 $ 314,513 5,272 7,093 12,365 $ 329,588 13,626 $ 340,504 Chino Valley 5.39% 5.47% 78,772 69,442 147,549 265,456 27,225 509,673 80,455 115,775 196,230 -9,571 $ 775,104 326 25,053 25,379 $ 810,054 $ 800,483 Colton 2.99% 3.10% 44,617 39,332 83,572 150,355 15,420 288,679 45,570 157,810 203,380 55,197 -5,421 $ 586,452 34,555 14,190 48,745 $ 640,618 $ 635,197 Loma Linda 1.72% 1.77% 25,469 22,452 47,706 85,828 8,802 164,788 26,013 81,029 107,042 50,704 -3,094 $ 344,908 2,893 8,100 10,993 $ 358,995 $ 355,901 Montclair 1.87% 1.89% 27,272 24,042 51,084 91,905 9,426 176,457 27,855 25,745 53,600 -3,314 $ 254,016 1,630 8,674 10,304 $ 267,634 13,382 $ 277,702 Rancho Cucamonga 7.02% 7.24% 104,311 91,956 195,386 351,519 36,051 674,911 106,539 114,150 220,689 -12,674 $ 987,237 326 33,175 33,501 $ 1,033,412 $ 1,020,738 Redlands 4.58% 4.55% 65,533 57,771 122,751 220,842 22,649 424,014 66,933 187,368 254,301 79,482 -7,962 $ 815,368 28,358 20,842 49,200 $ 872,530 $ 864,568 Rialto 4.66% 4.71% 67,911 59,867 127,205 228,854 23,471 439,398 69,361 235,184 304,545 75,371 -8,251 $ 878,973 45,305 21,598 66,903 $ 954,127 $ 945,876 Running Springs 0.28% 0.23% 3,242 2,858 6,072 10,924 1,120 20,973 3,311 18,788 22,099 19,380 -394 $ 65,301 523 1,031 1,554 $ 67,249 $ 66,855 San Bernardino Cty Fire 53.40% 53.37% 768,640 677,599 1,439,747 2,590,251 0 4,707,597 785,055 746,476 1,531,531 -93,390 $ 6,914,378 0 244,459 244,459 $ 7,252,227 $ 7,158,837 San Manuel 0.71% 0.71% 10,177 8,972 19,063 34,296 3,517 65,847 10,394 21,710 32,104 -1,237 $ 106,892 326 3,237 3,563 $ 111,692 5,585 21,620 $ 137,660 Victorville 10.02% 9.78% 140,809 124,131 263,751 474,515 48,665 911,062 143,816 102,418 246,234 -17,108 $ 1,280,997 326 44,783 45,109 $ 1,343,214 $ 1,326,106 0 $ - $ - $ - Needles Ambulance 0.27% 0.33% 4,726 4,166 8,853 15,927 28,945 4,827 0 4,827 -574 $ 37,924 0 1,503 1,503 $ 40,001 2,000 $ 41,427 County Road Dept 0.12% 0.10% 1,467 1,293 2,748 4,944 8,986 1,498 0 1,498 -178 $ 11,772 0 467 467 $ 12,417 621 $ 12,860 AMR 0 0 0 0 0 - 4,154 4,154 0 $ 4,154 0 0 0 $ 4,154 208 $ 4,362 TOTAL REVENUE 100.00% 100.00% $ 1,440,322 $ 1,269,724 $ 2,697,881 $ 4,853,763 $ 230,000 $ 9,051,368 $ 1,471,082 $ 1,958,798 $ 3,429,880 $ 337,200 $ 175,000 $ 14,083,770 $ 125,043 $ 458,081 $ 583,124 $ 14,841,894 $ 35,421 $ 21,620 $ 14,723,935 This is the current Budget Sheet which will be utilize for the billing of the agencies.
Notes:
This has the XBO Chief in the Budget
The Assistant Director was taken out
The Equity of 10% plus all step increases according to each MOU is included Adjustment were completed to help decrease cost in budget through contracting services of HR and MIS Column O: Ambulance Revenue of $175,00 offsets the cost for each of agencies.
Column W: Total due by each Agency for Operational, Equipment Replacement and Contract Cost for all Agencies.
CONFIRE REVENUE SHEET FISCAL YEAR 2024
Redlands Regular Meeting of 06-20-2023 968 of 1523
City Council Meeting K. 3.
DATE: 06/20/2023
TO: Honorable Mayor and City Council Members
SUBJECT: Consideration of a Request by the University of Redlands for the City of Redlands to serve as Fiscal Agent for University Grant Funds of $8,000,000 Appropriated by the State of California - General Fund pursuant to AB 179 (The Budget Act of 2022) for the University Village Project; Authorization to Submit Request to the California Department of Housing and Community Development (HCD) for Transfer of Grant Funds to the City of Redlands and Approve An Additional Appropriation to the Governmental Grant Funds Account; and Approval of the Fund Transfer Agreement with the University of Redlands (Management Services/Finance Director Garcia)
MOTION(S):
If the City Council determines that staff’s recommendation is appropriate, the following motion is provided:
1. I move to approve the request by the University of Redlands for the City of Redlands to serve as Fiscal Agent for University Grant Funds of $8,000,000 Appropriated by the State of California - General Fund pursuant to AB 179 (The Budget Act of 2022) for the University Village Project; and
2. I further move to authorize the submission of a request to the California Department of Housing and Community Development (HCD) for Transfer of University Grant Funds to the City of Redlands and approve an additional appropriation of the same to the Governmental Grant Funds Account; and
3. I further move to approve the Fund Transfer Agreement with the University of Redlands to transfer the amount of $8,000,000 to the University of Redlands and authorize the City Manager to execute the Agreement.
Redlands Regular Meeting of 06-20-2023 969 of 1523
RECOMMENDATION:
Staff recommends that the City Council approve the request by the University of Redlands for the City of Redlands to serve as Fiscal Agent for University Grant Funds of $8,000,000 Appropriated by the State of California - General Fund pursuant to AB 179 (The Budget Act of 2022) for the University Village Project; to authorize the submission to the California Department of Housing and Community Development (HCD) for Transfer of Grant Funds to the City of Redlands; and approve an additional appropriation to the Governmental Grant Funds Account; and approve the Fund Transfer Agreement with the University of Redlands for the transfer of $8,000,000 to the University of Redlands.
DISCUSSION:
On September 6, 2022, Assembly Bill (AB) 179 - the Budget Act of 2022 was signed into law. AB 179 is a budget implementing bill that includes funding for key priorities for the State, such as transportation, general government, parks and open space, education, fire prevention and public safety.
Under the general government category, the City of Redlands was allocated $8,000,000 on behalf of the University of Redlands for the construction of the University Village project.
The City has been working with University of Redlands executive staff to formulate an agreement that defines the terms and conditions of the City serving as fiscal agent for this state funding and how that relates to the University's expenditure of that funding. The terms in the attached agreement provide that:
upon receipt of the $8,000,000 grant, the City will transfer the grant funds to the University as an advanced lump sum payment permitted in Section 19.56(a)(5) of AB 179; the University, as recipient of the grant funds, shall submit quarterly financial statements to the City accounting for the use of grant funds for the project; and the University agrees to cooperate and assist the City in good faith by responding to any audits or requests for information by local, state or federal agencies.
The California Department of Housing & Community Development (HCD) will be implementing this award and has requested that the City submit documents to expedite the payment of the $8,000,000 grant to the City. Requested documents include a completed and signed Payee Data Record Form (STD 204) and a completed invoice for $8,000,000. HCD has indicated there will not be a corresponding grant agreement with the City nor will there be any further ongoing compliance issues for the City.
Redlands Regular Meeting of 06-20-2023 970 of 1523
In order to properly record the transaction of the pass-through grant funding, staff is requesting an additional appropriation of the $8,000,000 grant award into Fund 200, Governmental Grants. There will be no impact on the City's General Fund and the funds transfer of $8,000,000 from the State to the City to the University will be performed in a lump sum transaction as outlined in the funds transfer agreement. 100% of the grant funding will be transferred to the University.
ALTERNATIVES:
Council may choose to reject, modify or table the recommended action.
STRATEGIC PLAN:
N/A
SUBMITTED BY:
Danielle Garcia, Management Services/Finance Director
RECOMMENDED BY:
Charles M. Duggan Jr., City Manager
REVIEWED BY:
Yvette M. Abich Garcia, City Attorney
Janice McConnell, Assistant City Manager
Fiscal Impact
Discussion:
The fiscal impact associated with serving as Fiscal Agent for the University of Redlands' allocation of state funding is likely to be minimal, if any. The Fund Transfer Agreement requires the University to reimburse the City for any costs or expenses incurred by the City in connection with the City’s fiscal oversight of the grant funds.
Attachments
State HCD Provided Draft Invoice - City of Redlands
Final Funds Transfer Agreement
EXHIBIT A: UNIVERSITY FUNDING REQUEST
EXHIBIT B: ASSEMBLYMEMBER RAMOS BUDGET REQUEST
Additional Appropriation
Redlands Regular Meeting of 06-20-2023 971 of 1523
Address and telephone
INVOICE XXXX 1.24.2023
BILL TO SHIP TO INSTRUCTIONS
Housing & Community
Development
Attn: Accounts Payable
2020 W. El Camino Ave,
Suite 330
Sacramento, CA 95833
Same as recipient FEIN – xx-xxxxxxx
QUANTITY DESCRIPTION TOTAL
1 For the construction of their University of Redlands Village. $8,000,000 Reference Number:
22-GFD-046-INV 1
FI$Cal PO Number:
Thank you for your assistance in
this matter. $8,000,000
Redlands Regular Meeting of 06-20-2023 972 of 1523
FUNDS TRANSFER AGREEMENT FOR THE UNIVERSITY VILLAGE
PROJECT
BY AND BETWEEN
CITY OF REDLANDS
AND
UNIVERSITY OF REDLANDS
Redlands Regular Meeting of 06-20-2023 973 of 1523
I:\cmo\Agreements\Final UofR DRAFT Funds Transfer Agreement FY22-0176.docx - AE 1 FUNDS TRANSFER AGREEMENT
FOR THE UNIVERSITY VILLAGE PROJECT
This Agreement is entered into effective as of June 20, 2023 (“Agreement”), by and between the City of Redlands, a municipal corporation established and existing pursuant to the Constitution of the State of California, hereinafter referred to as the “City” and the University of Redlands, a public benefit non-profit corporation established and existing pursuant to the laws of the State of California, hereinafter referred to as the “Recipient”. City and Recipient may be collectively referred to as “Parties” or individually referred to as “Party” in this Agreement.
WITNESSETH
WHEREAS, the University Village Project (“Project”) is a “car-light” neighborhood design, with robust mix of uses, and transit-oriented themes that provides a valuable asset to the community both at its completion and well into the future; WHEREAS, the Recipient requested $18,000,000 in state budget allocation funds in a State Budget Request letter to Assemblymember James Ramos dated January 21, 2022 (“Funding Request” attached hereto as Exhibit A);
WHEREAS, on April 15, 2022, Assemblymember James Ramos submitted the budget request (attached hereto as Exhibit B) for $18,800,000.00, stating that “University of Redlands is a federally recognized Hispanic Serving Institution.
University Village will help sustain the University’s high-quality faculty, enrich the student experience, provide an abundance of new transit-oriented housing, spur new small businesses, generate employment opportunities and elevate community engagement with the University and with the citizens of Redlands”; WHEREAS, Assemblymember James Ramos nominated the City as the local administrator of the request (Exhibit B);
WHEREAS, in accordance with the AB 179 Budget Act of 2022 (the “Act”), Section 19.56(l)(12), $8,000,000.00 in funds (“Grant funds”) was allocated to the City of Redlands for the construction of the University Village Project (“Project”); WHEREAS, the Grant funds are payable from the state General Fund and will be disbursed to the City by the Department of Housing and Community Development; and WHEREAS, City has determined the best method for allocation of the Grant funds to the Recipient to ensure it is used for the purposes specified in Section 19.56 of the Act is a funds transfer agreement and to provide the Grant funds as an advance lump sum payment as allowed in Section 19.56(a)(5) of the Act.
Redlands Regular Meeting of 06-20-2023 974 of 1523
I:\cmo\Agreements\Final UofR DRAFT Funds Transfer Agreement FY22-0176.docx - AE 2 NOW, THEREFORE, in consideration of the mutual covenants herein set forth and the mutual benefits to be derived therefrom, the parties agree as follows:
TERMS & CONDITIONS
1. Incorporation of Recitals. The Recitals set forth above are true and correct and are incorporated into this Agreement as though fully set forth herein.
2. Recipient. The name of the Recipient is identified as the University of Redlands, hereinafter referred to as “Recipient”. Recipient wholly owns Zanja, LLC, which is the property owner of the land that Zanja, LLC will ground lease to a developer for construction of the Project.
3. Recipient Funding and Support. Upon receipt of the Grant funds from Department of Housing and Community Development, the City shall promptly remit the Grant funds to Recipient to fund the scope of services as provided in Part 4 (“Scope of Services”) herein. The Grant funds shall be encumbered by June 30, 2024 pursuant to Section 19.56(a)(7) of the Act. Recipient will place the Grant funds in an interest-bearing account, will use all interest proceeds toward the Scope of Services in the same manner as the principal, and will account for all such proceeds in the manner set forth in this Agreement.
4. Scope of Services. The Recipient’s Scope of Services pursuant to this Agreement is to use the Grant funds and accrued interest for purposes set forth in the Funding Request. In accordance with Section 19.56(a)(2) of the Act, Recipient attests that it shall only use Grant funds and any accrued interest for purposes specified in Section 19.56 of the Act. Further, Recipient agrees to indemnify, defend and hold harmless the City in the event that the Recipient’s use of Grant funds is outside of the purposes specified in Section 19.56 of the Act or violates any local, state or federal laws.
5. Time of Performance. Recipient anticipates that the Scope of Services will commence sometime in calendar year 2024, or as soon as practicable thereafter and will be completed as soon as practicable, and all Grant funds shall be expended by June 30, 2026, pursuant to Section 19.56(a)(7) of the Act.
6. Accounting, Reporting, Inspection, and Recordkeeping. The Recipient shall establish and maintain on a current basis an adequate accrual accounting system in accordance with generally accepted accounting principles, practices, and standards to account for the use of the Grant funds. At all times, the Chief Financial Officer of the Recipient shall maintain the financial books and records of the Recipient to be established pursuant to this Agreement and maintained by the Recipient separate and apart from other Recipient financial records and shall set forth all financial activity in connection with the use of the Grant funds as a separate line item in the annual budget of the Recipient.
Redlands Regular Meeting of 06-20-2023 975 of 1523
I:\cmo\Agreements\Final UofR DRAFT Funds Transfer Agreement FY22-0176.docx - AE 3 Recipient shall submit quarterly statements signed by the Chief Financial Officer of Recipient to the City accounting for the use of the Grant funds on the Project. The statements shall provide in reasonable detail the date any Grant funds were disbursed in the last three-month period, the amount of the disbursement, a detailed narrative description of the portion of the Scope of Services to which the disbursement was devoted, all applicable invoices, and the amount of Grant funds remaining unspent as of the end of the three-month period. Recipient will maintain a running list of all disbursements reported. When all Grant funds have been disbursed, Recipient will provide City with a final statement of cumulative costs incurred, marked “FINAL”. The final statement of costs shall constitute Recipient’s final financial report.
The Recipient shall permit on-site inspection by the City representatives during normal business hours with seven (7) days’ prior written notice and ensure that its employees furnish such information as may be relevant to a question of compliance with this Agreement.
All accounting and reporting records pertaining to the use of Grant funds disbursed to the Recipient hereunder shall be retained by the Recipient and available to the City for examination and for purposes of performing an audit for a period of seven (7) years from the date of disbursement.
Recipient agrees, at its sole cost, to cooperate and assist the City in good faith in responding to any audits, requests for information, documentation or inspection by any local, state or federal agency in connection with the use of the Grant funds.
7. Pursuant to Section 19.56(a)(3) of the Act, the Grant funds are exempt from the personal services contracting requirements of Article 4 (commencing with Section 19130) of Chapter 5 of Part 2 of Division 5 of Title 2 of the Government Code, from Part 2 (commencing with Section 10100) of Division 2 of the Public Contract Code, and the State Contracting Manual, and are not subject to the approval of the Department of General Services, including the requirements of Chapter 6 (commencing with Section 14825) of Part 5.5 of Division 3 of the Title 2 of the Government Code.
8. Discrimination. The Recipient shall not discriminate against any person on the basis of race, color, creed, religion, natural origin, ancestry, sex, disability, marital status, veteran status, sexual orientation or gender identity, or any other legally protected ground in the performance of the Scope of Services of this Agreement.
9. Changes in Grant Allocation. The City may, but is under no obligation to, grant additional funds at its sole discretion for use by the Recipient to assure the successful completion of the Project.
10. Notices. All notices herein required shall be in writing. Notices shall be sent by prepaid First Class Mail to the following Address:
Redlands Regular Meeting of 06-20-2023 976 of 1523
I:\cmo\Agreements\Final UofR DRAFT Funds Transfer Agreement FY22-0176.docx - AE 4 To the City: City of Redlands
Attention: Charles M. Duggan, Jr., City Manager
300 East State Street, Ste. 690
Redlands, CA 92373
Phone: (951) 798-7510
Email: [email protected]
To the Recipient: University of Redlands
Attention: Mr. Jason Doyle
1200 East Colton Ave., P.O. Box 3080
Redlands, CA 92373-0999
Phone: (909) 748-8020
Email: [email protected]
11. Counterparts; Electronic Signatures. The Agreement may be signed electronically. By signing this document in electronic form, the Parties agree that this Agreement may be transmitted and signed electronically by all Parties, and that such signatures shall have the same force and effect as original signatures, in accordance with California law and regulations, including but not limited to Civil Code section 1633.7.
12. Severability. Each and every section of this Agreement shall be construed as a separate and independent covenant and agreement. If any term or provision of this Agreement or the application thereof to certain circumstances shall be declared invalid or unenforceable, the remainder of this Agreement, or the application of such term or provision to circumstances other than those to which it is declared invalid or unenforceable, shall not be affected thereby, and each term and provision of this Agreement shall be valid and enforceable to the fullest extent permitted by law.
13. Amendment or Modification. This Agreement may only be modified or amended by written instrument duly approved and executed by each of the Parties hereto. Any such modification or amendment shall be valid, binding and legally enforceable only if in written form and executed by each of the Parties hereto, following all necessary approvals and authorizations for such execution.
14. Non-Waiver. Failure of either party to enforce any provision of this Agreement shall not constitute a waiver of the right to compel enforcement of the same provision or any remaining provisions of this Agreement.
15. Representatives of Persons Executing the Agreement. The persons executing this Agreement warrant that they are duly authorized to execute this Agreement on behalf of and bind the respective Party that each purports to represent.
16. Use of Names and Trademarks, Press Releases. Neither Party shall use the other party’s name, trademarks, or other logos in any publicity, advertising, or news release without the prior written approval of an authorized representative of that Party. The Parties agree that each Party may use factual information regarding the existence and Redlands Regular Meeting of 06-20-2023 977 of 1523
I:\cmo\Agreements\Final UofR DRAFT Funds Transfer Agreement FY22-0176.docx - AE 5 purpose of the relationship that is the subject of this Agreement for legitimate business purposes, to satisfy any reporting and funding obligations, or as required by applicable law or regulation without written permission from the other Party. In any such statement, the relationship of the Parties shall be accurately and appropriately described.
17. Consequential Damages and Limitation of Liability. Except as otherwise provided herein, the City and the Recipient agree that in no event will either be liable to the other under this Agreement for any consequential damages including but not limited to, special damages, loss of revenue, loss of profit, operating costs or business interruption losses, regardless of cause, including breach of contract, negligence, strict liability or otherwise. The limitations and exclusions of liability set forth herein shall apply regardless of fault, breach of contract, tort, strict liability or otherwise of the Recipient and the City, their employees or subconsultants.
18. Legal Proceedings. Should any legal proceedings be commenced by either Party to this Agreement to enforce, enjoin, or collect Grant funds or otherwise affect this Agreement between the Parties, said proceedings shall be filed in San Bernardino County Superior Court. The prevailing party shall be entitled to its reasonable attorneys’ fees and costs. Should any legal proceedings, disputes, or claims be commenced or asserted by any other person or entity including, but not limited to the Recipient’s development partners, contractors, subcontractors or agents against the City and any of its employees, agents and contractors in connection with the Project or Recipient’s breach of this Agreement, the Recipient agrees to indemnify, defend (with counsel retained by City) and hold the City and the City’s employees, agents and contractors harmless from any and all judgments, claims, losses and liability, including attorneys’ fees and costs, except to the extent such claims, losses and liabilities are caused solely by the negligence or willful misconduct of the City.
19. Reimbursement. Any reasonable costs, expenses, legal fees, including but not limited to the cost of outside counsel, incurred by the City in connection with enforcement of this Agreement and the obligations hereunder, shall be reimbursed to the City by the Recipient, within thirty (30) days of receipt of a statement of such expenses by the Recipient from the City. Total reimbursement under this clause shall not exceed Forty Thousand Dollars and Zero Cents ($40,000.00).
20. Exhibits. The exhibits to this Agreement are an integral part of this Agreement and have each been incorporated herein.
21. Entire Agreement. This Agreement constitutes the entire, final, complete, and exclusive agreement between Parties. This Agreement supersedes all prior negotiation, discussions and agreements between Parties concerning the subject matters covered herein. The Parties intend this Agreement to be the final expression of their agreement with respect to the subjects covered herein and a complete and exclusive statement of such terms.
Redlands Regular Meeting of 06-20-2023 978 of 1523
I:\cmo\Agreements\Final UofR DRAFT Funds Transfer Agreement FY22-0176.docx - AE 6 IN WITNESS WHEREOF, the Parties have caused this Agreement to be executed as of the day and year first written above.
CITY
City of Redlands
By:________________________________
Charles M. Duggan, Jr., City Manager
Attest
By:________________________
City Clerk
Approved as to Form:
By:________________________
City Attorney
RECIPIENT
University of Redlands
By:_________________________
Krista L. Newkirk, President
Approved as to Form:
By:________________________
Recipient General Counsel
Redlands Regular Meeting of 06-20-2023 979 of 1523
EXHIBIT A: UNIVERSITY FUNDING REQUEST
Redlands Regular Meeting of 06-20-2023 980 of 1523
EXHIBIT B: ASSEMBLYMEMBER RAMOS BUDGET REQUEST
Redlands Regular Meeting of 06-20-2023 981 of 1523
1200 East Colton Avenue • P.O. Box 3080 • Redlands CA 92373-0999 • Tel: 909-748-8390 Office of the President
January 21, 2022
The Honorable James Ramos
California State Capitol
P.O. Box 942849
Sacramento, CA 94249-0040
Re: State Budget Request for a Model Transit-Integrated Neighborhood, University Village at University of Redlands, Redlands, CA
Dear Assemblymember Ramos,
The University of Redlands, a federally designated Hispanic Serving Institution, is requesting your consideration and support for an $18 million state budget allocation for University Village – a 30-acre transit-oriented, multi-use, mixed-income, sustainable community adjacent to the terminus station of the MetroLink commuter train system. By providing over 1,000 new residential units, this new socio-economically-diverse neighborhood will assist the University in sustaining high-caliber faculty, provide housing opportunities for University staff and graduate students to reside near the campus where they work and learn to avoid time-consuming and costly commutes and reduce singlepassenger vehicle trips, as well as providing housing to the community at large. In addition, University Village will be largely self-contained. Featuring 68,000 square feet of localserving retail including a locally owned food market, featuring products from local purveyors, platforms for local performers and artists, a brewery, and other locally-owned neighborhood services; and 44,000 square feet of flex space for offices and live/work spaces, significantly reducing the need for automobile use.
The University of Redlands – through University Village – desires to uplift the underserved communities of San Bernardino County, offering an at-risk youth employment program, a commitment to local hiring goals, and construction contracts to be awarded to priority businesses including MBE and WBE.
In addition, the University is proposing an Innovation Lab – a hub of creativity where renowned local companies, such as ESRI, will come together with University staff, students Redlands Regular Meeting of 06-20-2023 982 of 1523
1200 East Colton Avenue • P.O. Box 3080 • Redlands CA 92373-0999 • Tel: 909-748-8390 and the community to address the 21st century challenges, such as climate change, income inequality, and access to health care.
The funds provided in this grant will accelerate the completion of the project by providing critical infrastructure funding for:
• Flood management including creating a new riparian creek running parallel with the Mill Creek Zanja, built in 1819 as an irrigation channel and listed on the National Register of Historic Places, and various water detention devices; • A multi-modal mobility system including pedestrian, cycling, micro-mobility, and public transit connections, creating a resilient network that links University Village to the campus, as well as the city and region;
• Wet & dry utilities to address outdated and/or inadequate systems including potable water, fire water, sewer, electrical, storm drains, water efficiency, and street improvements; and
• Community facilities and open space network including a Village Green, Mills Creek Zanja and greenway, and habitat corridors.
Completion of University Village is certain to become a national model for sustainability, raising the bar for what neighborhoods of the future can – and must be.
We urge your support for this request for Fiscal Year 2022 with our focus on providing the critical infrastructure to support economic development, sustain the environment, create jobs, and add mixed-income housing for young families and for seniors to age in place. We appreciate your consideration and look forward to the opportunity to meet with you and your staff to address any questions you may have regarding our request.
Sincerely,
Krista L Newkirk
President, University of Redlands
Redlands Regular Meeting of 06-20-2023 983 of 1523
2022 ASSEMBLY BUDGET DISTRICT REQUEST PRIORITIES
MEMBER NAME: JAMES RAMOS
DATE: 4/15/2022
STAFF CONTACT: MICHAEL CHEN; [email protected]
PRIORITY ORDER:
1. 2.
3. 4.
5. 6.
Redlands Regular Meeting of 06-20-2023 984 of 1523
2022 ASSEMBLY DISTRICT BUDGET REQUEST
PRIORITY NUMBER #X
MEMBER NAME: JAMES RAMOS
REQUEST TITLE: UNIVERSITY VILLAGE REDLANDS
TOTAL AMOUNT OF
GENERAL FUND
REQUESTED:
$18.8 MILLION
Description: Funding for a sustainable, multimodal, mixed use development centered around University of Redlands
Is this request for capital outlay: a “fixed asset (including land and construction) with a useful life of 10 or more years and a value which equals or exceeds one hundred thousand dollars”? Yes.
This budget request facilitates infrastructure improvements needed to accelerate housing the development of University Village.
Who would be the local administrator of this request? (Typically a city or county governmental entity.)
City of Redlands
Do you have a state department in mind to administer these funds? (This is rare and if no, budget staff will assist in identifying one.)
No
Other Information?
University of Redlands is a federally recognized Hispanic Serving Institution. University Village will help sustain the University’s high quality faculty, enrich the student experience,, provide an abundance of new transit-oriented housing, spur new small businesses, generate employment opportunities and elevate community engagement with the University and with the citizens of Redlands.
Staff Contact (name, email, Phone).
Michael Chen, [email protected], 916-319-2040
Please limit this form to 1 page only.
Redlands Regular Meeting of 06-20-2023 985 of 1523
DATE OF REQUEST:
An additional appropriation is hereby requested as follows:
Department:
JUSTIFICATION:
Requested By:
Recommended By Finance Director: Recommended:
Yes No Signed
Comments: Approved by City Council:
Date:
Signed:
City Clerk
REVENUE APPROPRIATION INCREASE (if applicable)
EXPENDITURE APPROPRIATION INCREASE (if applicable)
$ -
$ -
TRANSACTION NO:
ACCOUNTING PERIOD:
Account Description Orgkey Object Code Job Ledger (If
applicable) Amount
Job Ledger (If
applicable) Account Description Orgkey Object Code Amount Department Head
City Manager
CITY OF REDLANDS
REQUEST FOR ADDITIONAL APPROPRIATION
FINANCE USE ONLY
Redlands Regular Meeting of 06-20-2023 986 of 1523
City Council Meeting K. 4.
DATE: 06/20/2023
TO: Honorable Mayor and City Council Members
SUBJECT: Consideration of the Public Works Contract with F.M. Thomas Air Conditioning, Inc. for an amount not-to-exceed $193,050 for the A.K. Smiley Public Library Boiler Replacement Project, and determine that the project is exempt from environmental review pursuant to Section 15302(c) of the State's guidelines implementing the California Environmental Quality Act (Facilities and Community Services Assistant Director Crocker)
MOTION(S):
If the City Council determines that staff’s recommendation is appropriate, the following motions are provided:
I move that the City Council determine that approval of the Public Work Construction Contract with F.M. Thomas Air Conditioning, Inc. for the A.K. Smiley Public Library Boiler Replacement Project is exempt from environmental review pursuant to Section 15302(c) of the State's guidelines implementing the California Environmental Quality Act; and
1. I move that the City Council approve an award of the public works construction contract to F.M. Thomas Air Conditioning, Inc. in the amount of $193,050 for the A.K. Smiley Public Library Boiler Replacement Project.
2. RECOMMENDATION:
Staff recommends that City Council determine that approval of the Public Work Construction Contract is categorically exempt from environmental review in accordance with Section 15302(c) of the State’s guidelines implementing the California Environmental Quality Act. Staff further recommends that the City Council approve an award of contract with F.M. Thomas Air Conditioning, Inc., for an amount not-to-exceed $193,050 for the A.K. Smiley Public Library Boiler Replacement Project No. FCS03072023JN.
Redlands Regular Meeting of 06-20-2023 987 of 1523
DISCUSSION:
A.K. Smiley Public Library (Library) as a historical institution has served generations of patrons in the City of Redlands and beyond for over a century.
The Library's mechanical infrastructure was upgraded in 1990 and has been maintained by the City. The existing boiler system has reached the end of its useful life and is no longer efficient. As a result, the Library has experienced serious malfunctions, hot water outages, higher operating costs, and a reduced level of service for its patrons. The boiler replacement proposed by city staff is a critical infrastructure improvement that will enhance the Library's ability to provide a safe and comfortable environment for patrons and staff.
City staff conducted an inspection in early 2022 and confirmed that the existing boiler and all related appurtenances are at a point where repairs are neither feasible nor sustainable. In June of 2022, staff proceeded with issuing a request for proposals (RFP) for the design of a boiler system. The project design RFP was followed by a request for bids (RFB) for construction. The scope of the project consists of the removal and replacement of the existing boiler, boiler pumps, expansion tanks, new piping within the room, and reconnection of existing power to the new boiler and boiler pumps. Design West Engineering prepared the plans and specifications, and city staff advertised the project on April 6, 2023. The City Clerk's office received and opened two (2) bids for the project on April 26, 2023. The bids were reviewed by staff to determine if they were responsive to bid requirements. Based on the attached bid analysis, F.M.
Thomas Air Conditioning, Inc. is the lowest responsive and responsible bidder.
Therefore, it is recommended that the City Council award a Public Work Construction Contract to F.M. Thomas Air Conditioning, Inc., for an amount not-to-exceed $193,050.
The following three (2) Project bids were received before the submittal deadline:
BID OPENING REPORT SUMMARY
BIDDER BID AMOUNT
1. BT Construction * $138,158.90
2. F.M. Thomas Air Conditioning, Inc. $193,050.00
* An arithmetic error was discovered in the bid proposal. Bid Item #1 and #2 were not correctly totaled, the total bid amount was corrected based on the given unit price and highlighted in the attached bid analysis to identify arithmetic errors.
The bidder was considered non-responsive because they did not provide the appropriate specialty license, either for themselves or for their sub-contractor, and did not demonstrate sufficient qualifying experience in construction of at least three projects of a type similar in magnitude and character.
Furthermore, the project is categorically exempt from environmental review in accordance with Section 15302(c) of the State's guidelines implementing the California Environmental Quality Act (CEQA) as the project involves removal and replacement of existing facilities involving negligible or no expansion of capacity.
Redlands Regular Meeting of 06-20-2023 988 of 1523
ALTERNATIVES:
The City Council may elect not to approve the award of the Public Work Construction Contract and direct staff accordingly.
STRATEGIC PLAN:
Not applicable
SUBMITTED BY:
Tabitha Kevari, Facilities and Community Services Assistant Director RECOMMENDED BY:
Charles M. Duggan Jr., City Manager
REVIEWED BY:
Yvette M. Abich Garcia, City Attorney
Janice McConnell, Assistant City Manager
Danielle Garcia, Management Services/Finance Director
PREPARED BY:
Jawad Naderi, Associate Engineer
Fiscal Impact
Fiscal Year: FY 2023-24
Revenue Generating: N
Appropriation Required Y/N: N
Budgeted Y/N: Y
Account No.: 101190-8501
Discussion:
The FY 2021-22 budget included $350,000 for boiler replacement costs, which has been carried over to the current fiscal year. The total cost of the project will be $212,355.00 ($193,050 plus a 10% contingency).
Attachments
Public Work Contract-FM Thomas AC
Bid Opening Report
Bid Analysis
Redlands Regular Meeting of 06-20-2023 989 of 1523
1 I:\cmo\Agreements\F.M._Thomas_Air_Conditioning FY22-0169.doc - jm
PUBLIC WORK CONSTRUCTION CONTRACT
This Public Work Construction contract (“Contract”) is made and entered into this 20th day of June, 2023, by and between the City of Redlands, a municipal corporation, organized and existing under the laws of the State of California (hereinafter “City”), and F.M. Thomas Air Conditioning, Inc. (hereinafter "Contractor"). City and Contractor are sometimes individually referred to herein as a “Party” and, together, as the “Parties.”
In consideration of the mutual promises contained herein, City and Contractor agree as follows:
1. SCOPE OF WORK: Contractor shall furnish all materials and will perform all of the work for the following: A K Smiley Public Library Boiler Replacement Project, complete all items as required by the Contract Documents (as herein defined) and Specifications for City’s A K Smiley Public Library Boiler Replacement Project, FCS03072023JN (the “Work”).
2. CONTRACT SUM: City shall pay Contractor the sum of One hundred ninety-three thousand and fifty dollars ($193,050.00) as consideration for its performance of the Work in accordance with the terms and conditions set forth in the Contract Documents. Pursuant to Public Contract Code Section 22300, Contractor has the option to deposit securities with an escrow agent as a substitute for retention of earnings required to be withheld by City pursuant to an escrow agreement as set forth in Public Contract Code section 22300.
3. TIME FOR COMPLETION: The Work shall be completed within Ninety (90) calendar days from and after the date of City’s issuance of a Notice to Proceed to Contractor.
4. LIQUIDATED DAMAGES: Contractor’s failure to complete the Work within the time allowed will result in damages being sustained by City. Such damages are, and will continue to be, impracticable and extremely difficult to determine. Accordingly, Contractor shall pay to City, or have withheld from monies due to Contractor, the sum of five hundred dollars/cents ($500) for each consecutive calendar day in excess of the specified time for completion of the Work.
Execution of this Contract shall constitute agreement by City and Contractor that five hundred dollars ($500) per day is the estimated damage to City caused by the failure of Contractor to complete the work within the allowed time. Such sum is liquidated damages and shall not be construed as a penalty, and may be deducted from payments due Contractor if such delay occurs.
5. CONTRACT DOCUMENTS: This Contract incorporates by reference the following: Notice Inviting Bids, Instructions to Bidders, Contractor’s Proposal, Bid Bond, Agreement, Performance Bond, Labor and Material Bond, Plans, General Conditions, Special Provisions and Specifications, and any addenda thereto (collectively, the “Contract Documents”).
6. ATTORNEYS' FEES: In the event any action is commenced to enforce or interpret the terms or conditions of this Contract, or the Contract Documents, the prevailing Party in such action, in addition to any costs and other relief, shall be entitled to recover its reasonable attorneys’ fees, including fees for use of in-house counsel by a Party.
7. RESOLUTION OF CONSTRUCTION CLAIMS: Claims by Contractor in the amount of three hundred seventy-five thousand dollars ($375,000) or less shall be made by Contractor and processed by the City pursuant to the provisions of Part 3, Chapter 1, Article 1.5 of the Public Contract Code (commencing with Section 20104). All claims shall be in writing and include the Redlands Regular Meeting of 06-20-2023 990 of 1523
2 I:\cmo\Agreements\F.M._Thomas_Air_Conditioning FY22-0169.doc - jm documents necessary to substantiate the claim. Nothing in subdivision (a) of Public Contract Code Section 20104.2 shall extend the time limit or supersede the notice requirements provided in this case from filing claims by Contractor.
8. ELIGIBILITY OF CONTRACTOR/SUBCONTRACTOR: Contractor and all of its subcontractors shall abide by California Public Contract Code, Section 6109, and California Labor Code Sections 1777.1 and/or 1777.7, and certify that they are not debarred and are eligible to work on this project.
9. ASSIGNMENT OF AGREEMENT: No assignment by a Party of any rights or interests under this Contract shall be binding on another Party without the written consent of the Party sought to be bound.
10. SUCCESSORS AND ASSIGNS: City and Contractor each binds itself and their respective successors and assigns in respect to all covenants, agreements, and obligations contained in the Contract Documents.
11. SEVERABILITY: Any provision or part of the Contract Documents held to be void or unenforceable under any law or regulation shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon City and Contractor. [SIGNATURES ON FOLLOWING PAGE]
Redlands Regular Meeting of 06-20-2023 991 of 1523
3 I:\cmo\Agreements\F.M._Thomas_Air_Conditioning FY22-0169.doc - jm IN WITNESS WHEREOF, the Parties hereto have executed this Contract the day and year first written above.
CITY OF REDLANDS
(SEAL)
By:____________________________________
Eddie Tejeda, Mayor
ATTEST:
____________________________________
Jeanne Donaldson, City Clerk
(SEAL)
Thomas Feyka______________________________
Name of Contractor
By:_______________________________________
Signature of Authorized Agent
President_______________________________________
Title
__________________________________________
Signature of Authorized Agent (if necessary)
__________________________________________
Title
__________________________________________
Contractor's License No.
Redlands Regular Meeting of 06-20-2023 992 of 1523
4 I:\cmo\Agreements\F.M._Thomas_Air_Conditioning FY22-0169.doc - jm
WORKER'S COMPENSATION INSURANCE CERTIFICATION
Description of Contract: City of Redlands
Facilities and Community Services Department
A K Smiley Public Library Boiler Replacement Project
FCS03072023JN
______________________
Every employer, except the State, shall secure the payment of compensation in one or more of the following ways:
a. By being insured against liability to pay compensation by one or more insurers duly authorized to write compensation insurance in this State. b. By securing from the Director of Industrial Relations, a certificate of consent to selfinsure, either as an individual employer, or as one employer in a group of employers, which may be given upon furnishing proof satisfactory to the Director of Industrial Relations of ability to self-insure and to pay any compensation that may become due to his or her employees.
CHECK ONE
_____I am aware of the provisions of Section 3700 of the Labor Code which requires every employer to be insured against liability for Workers’ Compensation or to undertake self-insurance in accordance with the provisions of that Code, and I will comply with such provisions before commencing the performance of the work and activities required or permitted under this Agreement. (Labor Code §1861).
_____I affirm that at all times, in performing the work and activities required or permitted under this Agreement, I shall not employ any person in any manner such that I become subject to the workers’ compensation laws of California. However, at any time, if I employ any person such that I become subject to the workers’ compensation laws of California, immediately I shall provide the City with a certificate of consent to self-insure, or a certification of workers’ compensation insurance.
I certify under penalty of perjury under the laws of the State of California that the information and representations made in this certificate are true and correct.
Dated this day of , 2023.
F.M. Thomas Air Conditioning, Inc.
(Contractor)
_____________________________________
(Signature)
President_________________________
(Official Title)
(SEAL)
(Labor Code Section 1861 provides that the above certificate must be signed and filed by the Contractor with the Owner prior to performing the work of the contract.)
Redlands Regular Meeting of 06-20-2023 993 of 1523
5 I:\cmo\Agreements\F.M._Thomas_Air_Conditioning FY22-0169.doc - jm
FAITHFUL PERFORMANCE BOND
Whereas, the City of Redlands (“City”), State of California, and F.M. Thomas Air Conditioning, Inc. (hereinafter designated as "Principal") have entered into an agreement dated June 20th, 2023 (“Agreement”) whereby Principal agrees to install and complete certain public improvements (the “Work”), which said Agreement is identified as A K Smiley Public Library Boiler Replacement Project and is hereby referred to and made a part hereof; and Whereas, said Principal is required under the terms of the Agreement to furnish a bond for the faithful performance of the Work, now, therefore, we, the Principal and, _____________________________, as Surety, are held and firmly bound unto the City in the penal sum of One hundred ninety-three thousand and fifty dollars ($193,050.00) lawful money of the United States, for the payment of which sum we bind ourselves, and our heirs, successors, executors and administrators, jointly and severally, firmly by these presents.
The condition of this obligation is such that if the above bounded Principal, his or its heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions and provisions in the Agreement and any alteration thereof made as therein provided, on his or its part, to be kept and performed at the time and in the manner therein specified, and in all respects according to their true intent and meaning, and shall faithfully fulfill the one-year guarantee of all materials and workmanship, and shall defend, indemnify and save harmless the City and its elected officials, officers, agents and employees, as therein stipulated, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect.
As a part of the obligation secured hereby and in addition to the face amount specified therefor, there shall be included costs and reasonable expenses and fees, including reasonable attorneys’ fees, incurred by the City in successfully enforcing such obligations, all to be taxed as costs and included in the judgment rendered.
As a condition precedent to the satisfactory completion of the Work, the above obligation shall hold good for a period of one (1) year or longer if required by the Agreement after the acceptance of the work by the City, during which time if the Principal shall fail to make full, complete, and satisfactory repair and replacements and totally protect the City from loss or damage made evident during this period from the date of completion of the Work, and resulting from or caused by defective materials or faulty workmanship, the above obligation in penal sum thereof shall remain in full force and effect. The obligations of Surety hereunder shall continue so long as any obligation of the Principal remains.
Whenever the Principal shall be, and is declared by the City to be, in default under the Agreement, the City having performed the City obligations thereunder, the Surety shall promptly remedy the default, or shall promptly, at the City’s option:
1. Complete the Work in accordance with its terms and conditions; or
2. Obtain a bid or bids for completing the Work in accordance with its terms and conditions, and upon determination by Surety of the lowest responsive and responsible bidder, arrange for a contract between such bidder and the City, and make available as work progresses sufficient funds to pay the cost of completion of the Work less the balance of the Agreement price, Redlands Regular Meeting of 06-20-2023 994 of 1523
6 I:\cmo\Agreements\F.M._Thomas_Air_Conditioning FY22-0169.doc - jm but not exceeding, including other costs and damages for which Surety may be liable hereunder, the amount set forth above. The term “balance of the Agreement price,” as used in this paragraph, shall mean the total amount payable to the Principal by the City under the Agreement and any modifications thereto, less the amount previously properly paid by the City to the Principal.
Surety expressly agrees that the City may reject any contractor or subcontractor which may be proposed by Surety in fulfillment of its obligations in the event of default by the Principal.
Surety shall not utilize the Principal in completing the Work nor shall Surety accept a bid from the Principal for completion of the Work if the City, when declaring the Principal in default, notifies Surety of the City’s objection to the Principal’s further participation in the completion of the Work.
No right of action shall accrue on the bond to or for the use of any person or corporation other than the City named herein or the successors or assigns of the City. Any suit under this bond must be instituted within the applicable statute of limitations period.
The said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Agreement or to the work to be performed thereunder or the Specifications accompanying the same shall in any way affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Agreement or to the work or to the specifications.
No final settlement between the City and the Principal shall abridge the right of any beneficiary hereunder whose claim may be unsatisfied.
The Principal and Surety agree that if the City is required to engage the services of any attorney in connection with the enforcement of this bond, each shall pay the City’s reasonable attorneys’ fees incurred, with or without suit, in addition to the above sum.
In witness whereof, this instrument has been duly executed by the Principal and Surety above named, on , 2023.
(SEAL) (SEAL)
(Contractor) (Surety)
BY:
(Signature) (Signature)
Address:___________________________________
__________________________________________
(Seal and Notarial Acknowledgment of
Surety)
Telephone ( )___________________________
Redlands Regular Meeting of 06-20-2023 995 of 1523
7 I:\cmo\Agreements\F.M._Thomas_Air_Conditioning FY22-0169.doc - jm
LABOR AND MATERIAL BOND
Whereas, the City Council of the City of Redlands, State of California, and F.M. Thomas Air Conditioning, Inc. (hereinafter designated as “Principal”) have entered into an agreement (the “Agreement”) whereby Principal agrees to install and complete certain designated public improvements (the “Work”), which said agreement, dated June 20th, 2023, and identified as A K Smiley Public Library Boiler Replacement Project, FCS03072023JN is hereby referred to and made a part hereof; and
Whereas, under the terms of the Agreement, Principal is required before commending the performance of the Work, to file a good and sufficient Labor and Material bond with the City of Redlands to secure the claims to which reference is made in Title 3 (commencing with Section 9550) of Part 6 of Division 4 of the Civil Code of the State of California.
Now, therefore, said Principal and the undersigned as corporate surety, are held firmly bound unto the City and all contractors, subcontractors, laborers, material men and other persons employed in the performance of the Agreement and referred to in the aforesaid Code of Civil Procedure in the sum of One hundred ninety-three thousand and fifty dollars ($193,050.00) for materials furnished or labor thereon of any kind, or for amounts due under the Unemployment Insurance Act with respect to such work or labor, that said surety will pay the same in an amount not exceeding the amount hereinabove set forth, and also in case suit is brought upon this bond, will pay, in addition to the face amount thereof, costs and reasonable expenses and fees, including reasonable attorneys’ fees, incurred by the City in successfully enforcing such obligation, to be awarded and fixed by the court, and to be taxed as costs and to be included in the judgment therein rendered.
It is hereby expressly stipulated and agreed that this bond shall insure to the benefit of any and all persons, companies and corporations entitled to file claims under Title 3 (commencing with Section 9550) of Part 6 of Division 4 of the Civil Code, so as to give a right of action to them or their assigns in any suit brought upon this bond.
Should the condition of this bond be fully performed, then this obligation shall become null and void, otherwise it shall be and remain in full force and effect.
The surety hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Agreement or the specifications accompanying the same shall in any manner affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition.
In witness whereof, this instrument has been duly executed by the Principal and surety above named, on _______________________, 2023.
(SEAL) (SEAL)
(Contractor) (Surety)
BY:
(Signature) (Signature)
Address:_____________________________
(Seal and Notarial Acknowledgement of Surety) ____________________________________ Telephone: ( )___________________
Redlands Regular Meeting of 06-20-2023 996 of 1523
Redlands Regular Meeting of 06-20-2023 997 of 1523
ATTACHMENT "C"
PROJECT NO.FCS03072023JN BID DATE: 26-Apr-2023
A K SMILEY PUBLIC LIBRARY BOILER EST. START DATE: 20-Jun-2023 Unit Price Item Price Unit Price Item Price
1 Mobilization (Maximum 5%
of Total Base Bid Price) 1 LS $6,912.95 $6,912.95 $9,502.00 $9,502.00 2 Installation per plans, plan dated 03/01/2023 1 LS $131,245.95 $131,245.95 $183,548.00 $183,548.00 Total Bid Schedule
Addition error, bid item #1
and #2 are not totaled
correctly.
CITY OF REDLANDS
FACILITIES AND COMMUNITY SERVICES DEPARTMENT
BID ANALYSIS
Item
No.
FM Thomas Air
Bid Item Quantity Unit Conditioning Inc BT Construction $138,158.90 $193,050.00
Low Bidders #1, #2 and #3
Sheet 1 of 2
Redlands Regular Meeting of 06-20-2023 998 of 1523
City Council Meeting K. 5.
DATE: 06/20/2023
TO: Honorable Mayor and City Council Members
SUBJECT: Consideration of a Public Works Construction Contract with CEM Construction Corporation for the 2022 CIP Sewer Pipeline Replacement Project for an amount not-to-exceed $3,314,268; and determination that the Project is exempt from environmental review pursuant to Section 15302 of the State's guidelines implementing the California Environmental Quality Act (Municipal Utilities and Engineering Director Harris)
MOTION(S):
If City Council determines the staff recommendation is appropriate, the following motions are provided:
I move that the City Council determine that approval of the 2022 CIP Sewer Pipeline Replacement Project is exempt from environmental review pursuant to Section 15302 of the State's Guidelines implementing the California Environmental Quality Act; and
1. I move to approve the 2022 CIP Sewer Pipeline Replacement Project plans and specifications, and award the Public Work Construction Contract to CEM Construction Corporation for an amount not to-exceed $3,314,268.
2. RECOMMENDATION:
Staff recommends City Council determine that approval of the 2022 CIP Sewer Pipeline Replacement Project is exempt from environmental review pursuant to Section 15302 of the State's guidelines implementing the California Environmental Quality Act. Staff further recommends City Council approve the 2022 CIP Sewer Pipeline Replacement Project plans and specifications and award a Public Work Construction Contract to CEM Construction Corporation for an amount not-to-exceed $3,314,268.
Redlands Regular Meeting of 06-20-2023 999 of 1523
DISCUSSION:
The 2022 CIP Sewer Pipeline Replacement Project (Project) will rehabilitate wastewater collection pipelines at numerous locations throughout the City. The Project will use cured-in-place pipe (CIPP) technology to rehabilitate approximately 12,672 linear feet of eight inch (8”), ten inch (10"), and twelve inch (12") diameter pipelines, and will remove and replace approximately 10,578 linear feet of eight inch (8”), ten inch (10"), twelve inch (12") diameter pipeline using traditional trenching practices. These pipelines were selected based on maintenance history and inspection records.
In mid-April, staff prepared plans and specifications and advertised the Project for construction. On May 10, 2023, the City Clerk's office received and opened the following seven (7) bids:
BID OPENING REPORT SUMMARY
Bidder Bid Amount
1. CEM Construction Corporation, Montebello, CA $3,314,268
2. Christensen Brothers General Engineering, Apple Valley, CA $3,338,532
3. Tryco General Engineering, Rimforest, CA $3,928,505
4. MNR Construction Inc, La Verne, CA $4,494,215
5. MCC Equipment Rentals, Inc., Yucaipa, CA $4,657,400*
6. Weka, Inc, San Bernardino, CA $4,996,217
7. GRBCON, Inc., Baldwin Park, CA $5,170,171
*An arithmetic error was made in the bid proposal. The total bid amount was corrected and highlighted in the attached Bid Analysis to identify arithmetic errors, but did not affect ranking.
Bids were reviewed by staff and CEM Construction Corporation was determined to be the lowest responsive and responsible bidder. Therefore, staff recommends awarding a Public Works Construction Contract to CEM Construction Corporation for an amount not-to-exceed $3,314,268. If approved, it is anticipated that the Project will be completed within 120 calendar days from issuance of a Notice to Proceed. This project is exempt from environmental review pursuant to Section 15302 of the State's guidelines implementing the California Environmental Quality Act since it replaces or reconstructs an existing utility system with negligible or no expansion of capacity.
Redlands Regular Meeting of 06-20-2023 1000 of 1523
ALTERNATIVES:
City Council may deny the staff recommendation and provide alternate direction.
STRATEGIC PLAN:
N/A
SUBMITTED BY:
John R. Harris, Municipal Utilities and Engineering Director RECOMMENDED BY:
Charles M. Duggan Jr., City Manager
REVIEWED BY:
Yvette M. Abich Garcia, City Attorney
Janice McConnell, Assistant City Manager
Danielle Garcia, Management Services/Finance Director
Goutam K. Dobey, City Engineer
PREPARED BY:
Johana Silva, Associate Engineer
Fiscal Impact
Fiscal Year: FY 22/23
Appropriation Required Y/N: No
Budgeted Y/N: Yes
Account No.: 521910
Discussion:
There is no fiscal impact associated with this action. The FY 22/23 MUED budget includes sufficient funding for this project.
Attachments
Project Plans
Specifications
A. CEM Public Works Contract
B. Bid Opening Report
C. Bid Analysis
D. Location Map
Redlands Regular Meeting of 06-20-2023 1001 of 1523
Redlands Regular Meeting of 06-20-2023 1002 of 1523
210
10 10
MARIO SAUCEDO, COUNCIL MEMBER
2022 CIP SEWER PIPELINE REPLACEMENT PROJECT
CITY COUNCIL:
JENNA GUZMAN-LOWERY, COUNCIL MEMBER
CITY STAFF:
CHARLES M. DUGGAN JR., CITY MANGER
DENISE DAVIS, COUNCIL MEMBER
EDDIE TEJEDA, MAYOR
PAUL BARICH, MAYOR PRO TEM
CITY OF REDLANDS
CONSTRUCTION PLANS FOR
APRIL 2023
VICINITY MAP
NTS
PROJECT No. 521029
TITLE SHEET & VICINITY MAP
CITY CLERK:
JEANNE DONALDSON, CITY CLERK
NORTH OPAL AVE CRAFTON AVE
COLTON AVE
SAN BERNARDINO AVE CHURCH ST TEXAS ST ORANGE ST ALABAMA ST NEVADA ST
BROOKSIDE AVE DEARBORN ST
OLIVE AVE
FERN AVE
CYPRESS AVE
PALM AVE
CITY OF REDLANDS
CITY OF REDLANDS
COUNTY OF
SAN BERNARDINO
SHEET INDEX:
CITY LIMIT LINE
CITY LIMIT LINE WABASH AVE
CITRUS AVE
REDLANDS BLVD
CENTER ST JUDSON ST UNIVERSITY ST
LUGONIA AVE
CYPRESS AVE
HIGHLAND AVE
SAN MATEO ST
BROCKTON AVE
WESTERN AVENUE, WASHINGTON STREET,
LUGONIA AVENUE ALLEY & BROCKTON AVENUE ALLEY
SHEET 4 LAWTON STREET, OHIO STREET,
WESTERN AVENUE & CLAY STREET
SHEET 3
CRESCENT AVE
ALVARADO ST
PIONEER AVE
CAJON STREET, GARDEN STREET EASEMENT,
KNOLL ROAD & ELIZABETH STREET
SHEET 9 & 11
CITY OF REDLANDS F-1866
14 BENCHMARK
2022 CIP SEWER PIPELINE REPLACEMENT
PROJECT NO. 521029
AS SHOWN
N/A
1 SAN GORGONIO DRIVE &
BUENA VISTA STREET
SHEET 6
FERN AVENUE, GRANT STREET, EUREKA STREET,
4TH STREET, & LA VERNE STREET
SHEET 7 & 8
SMILEY HEIGHTS DRIVE, PINE KNOLL CREST,
SAN JACINTO STREET, SERPENTINE DRIVE &
CAJON STREET
SHEET 11
CENTER STREET, BURKE STREET,
SOUTH AVENUE, SOUTH AVENUE
& MONICELLO COURT
SHEET 10
FORD STREET & CAMINO REAL
SHEET 12
EUREKA EASEMENT, STUART AVENUE,
BROCKTON AVENUE ALLEY &
ALLEY NORTH OF HIGH AVENUE
SHEET 5 & 12
ALLEY EAST OF OHIO STREET,
ALLEY EAST OF CLAY STREET &
ALLEY EAST OF WASHINGTON STREET
SHEET 13 & 14
Redlands Regular Meeting of 06-20-2023 1003 of 1523
GENERAL NOTES, CONSTRUCTION NOTES,
D
A
IG
C
E
L
B FOR
U YO
E
Service Alert ground
Under SYMBOL LEGEND AND DETAILS
1-800-227-2600
GENERAL NOTES
ENGINEER'S NOTICE TO CONTRACTOR
SYMBOL LEGEND
DETAIL
SCALE
1 SERVICE LATERAL CONNECTION DETAIL 2
NOT TO SCALE
NOTES:
WATER AND SEWER SEPARATION STANDARDS
EXISTING MANHOLE CONNECTION DETAIL 3
NOT TO SCALE
NOTES:
TERMINUS MH WITH LATERALS DETAIL
NOT TO SCALE
PLAN VIEW
ELEVATION VIEW
1 TYPICAL SPOT REPAIR DETAIL 4
NOT TO SCALE
NOTES:
CITY OF REDLANDS F-1866
14 BENCHMARK
2022 CIP SEWER PIPELINE REPLACEMENT
PROJECT NO. 521029
AS SHOWN
N/A
2 CONSTRUCTION NOTES QUANTITIES
2 2
2 2
TYPICAL TRENCH, BEDDING & SURFACE RESTORATION DETAIL
NOT TO SCALE
5 NOTES
GRIND AND OVERLAY THICKNESS
TRENCH REPAIR GENERAL NOTES
2 Redlands Regular Meeting of 06-20-2023 1004 of 1523
D A IGC E L B FOR U YO E
Service Alert ground
Under
1-800-227-2600
GRAPHIC SCALE LAWTON STREET, OHIO STREET, WESTERN AVENUE AND
CLAY STREET
CITY OF REDLANDS F-1866
14 BENCHMARK
2022 CIP SEWER PIPELINE REPLACEMENT
PROJECT NO. 521029
AS SHOWN
N/A 3
Redlands Regular Meeting of 06-20-2023 1005 of 1523
D A IGC E L B FOR U YO E
Service Alert ground
Under
1-800-227-2600
GRAPHIC SCALE WESTERN AVENUE, WASHINGTON STREET, LUGONIA
AVENUE ALLEY & BROCKTON AVENUE ALLEY
CITY OF REDLANDS F-1866
14 BENCHMARK
2022 CIP SEWER PIPELINE REPLACEMENT
PROJECT NO. 521029
AS SHOWN
N/A 4
Redlands Regular Meeting of 06-20-2023 1006 of 1523
D A IGC E L B FOR U YO E
Service Alert ground
Under
1-800-227-2600
GRAPHIC SCALE EUREKA EASEMENT, STUART AVENUE & BROCKTON
AVENUE ALLEY BETWEEN TRIBUNE STREET &
HERALD STREET
CITY OF REDLANDS F-1866
14 BENCHMARK
2022 CIP SEWER PIPELINE REPLACEMENT
PROJECT NO. 521029
AS SHOWN
N/A 5
Redlands Regular Meeting of 06-20-2023 1007 of 1523
GRAPHIC SCALE
SAN GORGONIO DRIVE & BUENA VISTA STREET
CITY OF REDLANDS F-1866
14 BENCHMARK
2022 CIP SEWER PIPELINE REPLACEMENT
PROJECT NO. 521029
AS SHOWN
N/A 6 D A IGC E L B FOR U YO E
Service Alert ground
Under
1-800-227-2600
Redlands Regular Meeting of 06-20-2023 1008 of 1523
D A IG C E L B FOR U YO E
Service Alert ground
Under
1-800-227-2600
GRAPHIC SCALE
FERN AVENUE, GRANT STREET & EUREKA STREET 7
CITY OF REDLANDS F-1866
14 BENCHMARK
2022 CIP SEWER PIPELINE REPLACEMENT
PROJECT NO. 521029
AS SHOWN
N/A
Redlands Regular Meeting of 06-20-2023 1009 of 1523
D A IG C E L B FOR U YO E
Service Alert ground
Under
1-800-227-2600
GRAPHIC SCALE
4TH STREET, EUREKA STREET & LA VERNE STREET 8
CITY OF REDLANDS F-1866
14 BENCHMARK
2022 CIP SEWER PIPELINE REPLACEMENT
PROJECT NO. 521029
AS SHOWN
N/A
Redlands Regular Meeting of 06-20-2023 1010 of 1523
D A IG C E L B FOR U YO E
Service Alert ground
Under
1-800-227-2600
GRAPHIC SCALE GARDEN STREET EASEMENT, KNOLL ROAD &
ELIZABETH STREET
CITY OF REDLANDS F-1866
14 BENCHMARK
2022 CIP SEWER PIPELINE REPLACEMENT
PROJECT NO. 521029
AS SHOWN
N/A 9
Redlands Regular Meeting of 06-20-2023 1011 of 1523
D A IG C E L B FOR U YO E
Service Alert ground
Under
1-800-227-2600
GRAPHIC SCALE CENTER STREET, BURKE STREET, SOUTH AVENUE &
MONTICELLO COURT
CITY OF REDLANDS F-1866
14 BENCHMARK
2022 CIP SEWER PIPELINE REPLACEMENT
PROJECT NO. 521029
AS SHOWN
N/A
10 Redlands Regular Meeting of 06-20-2023 1012 of 1523
GRAPHIC SCALE SMILEY HEIGHTS DRIVE, PINE KNOLL CREST, SAN
JACINTO STREET, SERPENTINE DRIVE & CAJON STREET
CITY OF REDLANDS F-1866
14 BENCHMARK
2022 CIP SEWER PIPELINE REPLACEMENT
PROJECT NO. 521029
AS SHOWN
N/A
11 D A IG C E L B FOR U YO E
Service Alert ground
Under
1-800-227-2600
Redlands Regular Meeting of 06-20-2023 1013 of 1523
GRAPHIC SCALE ALLEY NORTH OF HIGH AVENUE,
FORD STREET & CAMINO REAL
CITY OF REDLANDS F-1866
14 BENCHMARK
2022 CIP SEWER PIPELINE REPLACEMENT
PROJECT NO. 521029
AS SHOWN
N/A
12 D A IGC E L B FOR U YO E
Service Alert ground
Under
1-800-227-2600
Redlands Regular Meeting of 06-20-2023 1014 of 1523
GRAPHIC SCALE ALLEY EAST OF OHIO STREET,
ALLEY EAST OF CLAY STREET &
ALLEY EAST OF WASHINGTON STREET
CITY OF REDLANDS F-1866
14 BENCHMARK
2022 CIP SEWER PIPELINE REPLACEMENT
PROJECT NO. 521029
AS SHOWN
N/A
13 D A IGC E L B FOR U YO E
Service Alert ground
Under
1-800-227-2600
Redlands Regular Meeting of 06-20-2023 1015 of 1523
GRAPHIC SCALE ALLEY EAST OF OHIO STREET,
ALLEY EAST OF CLAY STREET &
ALLEY EAST OF WASHINGTON STREET
CITY OF REDLANDS F-1866
14 BENCHMARK
2022 CIP SEWER PIPELINE REPLACEMENT
PROJECT NO. 521029
AS SHOWN
N/A
14 D A IG C E L B FOR U YO E
Service Alert ground
Under
1-800-227-2600
Redlands Regular Meeting of 06-20-2023 1016 of 1523
CITY OF REDLANDS
MUNICIPAL UTILITIES &
ENGINEERING DEPARTMENT
Bid Proposal, Contract Documents and Specifications
For
2022 CIP SEWER PIPELINE REPLACEMENT PROJECT
PROJECT NO. 521029
April 2023
Redlands Regular Meeting of 06-20-2023 1017 of 1523
Redlands Regular Meeting of 06-20-2023 1018 of 1523
CITY OF REDLANDS
MUNICIPAL UTILITIES & ENGINEERING DEPARTMENT
Bid Proposal, Contract Documents and Specifications
for
2022 CIP SEWER PIPELINE REPLACEMENT PROJECT
PROJECT NO. 521029
For use in conjunction with specifications entitled: “Standard Specifications for Public Works Construction (Greenbook)” 2021 Edition; “Standard Plans for Public Works Construction” 2021 Edition; Municipal Utilities and Engineering Department’s Water Systems Standard Specifications and Sanitary Sewer System Standard Specifications, latest editions; and General Permit Conditions and Trench Specifications.
City Council:
Eddie Tejeda, Mayor
Paul T. Barich, Mayor Pro Tem
Denise Davis, Councilmember
Jenna Guzman-Lowery, Councilmember
Mario Saucedo, Councilmember
City Clerk:
Jeanne Donaldson, City Clerk
City Staff:
Charles M. Duggan Jr., City Manager
April 2023
Redlands Regular Meeting of 06-20-2023 1019 of 1523
THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 06-20-2023 1020 of 1523
TOC 1
2022 CIP SEWER PIPELINE REPLACEMENT PROJECT
PROJECT NO. 521029
TABLE OF CONTENTS
(XX) REFLECTS PAGE IDENTIFICATION FOOTER ABBREVIATION
NOTICE INVITING SEALED PROPOSALS (NIB)
BID DOCUMENTS (BD)
INSTRUCTIONS TO BIDDERS .......................................................................................... 1 PROPOSAL….. ................................................................................................................... 10 BID CERTIFICATION ........................................................................................................ 13 BID BOND…. ..................................................................................................................... 14 NON-COLLUSION AFFIDAVIT ...................................................................................... 15 STATEMENT BY BIDDER ............................................................................................... 16 OFFICERS OF CORPORATION (Members of Firm) ....................................................... 16 SUB-CONTRACTORS LIST ............................................................................................. 17 QUALIFICATION AND EXPERIENCE STATEMENT .................................................. 18 GENERAL INFORMATION ............................................................................................. 19
CONTRACT DOCUMENTS (CD)
PUBLIC WORK CONSTRUCTION CONTRACT ........................................................ 1 WORKER'S COMPENSATION INSURANCE CERTIFICATION ............................ 4
GENERAL CONDITIONS (GC)
SECTION 1 – GENERAL, TERMS, DEFINITIONS, ABBREVIATIONS, UNITS OF MEASURE, AND SYMBOLS ...................................................................... 1 SECTION 2 - SCOPE OF THE WORK ............................................................................... 2 SECTION 3 - CONTROL OF THE WORK ......................................................................... 3 SECTION 4 - CONTROL OF MATERIALS ....................................................................... 7 SECTION 5 – LEGAL RELATIONS AND RESPONSIBILITES ...................................... 8 SECTION 6 – PROSECUTION AND PROGRESS OF THE WORK .............................. 30 SECTION 7 - MEASUREMENT AND PAYMENT ......................................................... 32 SECTION 8 - FACILITIES FOR AGENCY PERSONNEL .............................................. 33 SECTION 9 - ASSIGNMENT OF UNFAIR BUSINESS PRACTICES CLAIMS ........... 33 SECTION 10 - TRENCHING AND EXCAVATION ........................................................ 33 SECTION 11 - REMOVAL, RELOCATION OR PROTECTION OF EXISTING UTILITIES ................................................................................................... 34 SECTION 200 - ROCK MATERIALS ............................................................................... 35 SECTION 201 - CONCRETE, MORTAR AND RELATED MATERIALS ..................... 36 SECTION 203 - BITUMINOUS MATERIALS ................................................................. 36 Redlands Regular Meeting of 06-20-2023 1021 of 1523
TOC 2
SECTION 206 - MISCELLANEOUS METAL ITEMS ..................................................... 37 SECTION 207 – GRAVITY PIPE ...................................................................................... 38 SECTION 211 - MATERIAL TESTS ................................................................................ 38 SECTION 214 - TRAFFIC STRIPING, CURB AND PAVEMENT MARKINGS, AND PAVEMENT MARKERS ........................................................................... 38 SECTION 300 - EARTHWORK ........................................................................................ 39 SECTION 301 - TREATED SOIL, SUBGRADE PREPARATION AND PLACEMENT OF BASE MATERIALS ............................................................................. 43 SECTION 302 - ROADWAY SURFACING ..................................................................... 48 SECTION 303 - CONCRETE AND MASONRY CONSTRUCTION .............................. 58 SECTION 304 - METAL FABRICATION AND CONSTRUCTION .............................. 62 SECTION 314 - TRAFFIC STRIPING, CURB AND PAVEMENT MARKINGS, AND PAVEMENT MARKERS ........................................................................... 62
GENERAL REQUIREMENTS
SECTION 01110 COORDINATION OF WORK
SECTION 01111 TRAFFIC CONTROL PLAN
SECTION 01112 DESCRIPTION OF WORK
SECTION 01200 MEASUREMENT AND PAYMENT
SECTION 01251 CHANGE ORDER REQUESTS
SECTION 01254 CHANGE ORDERS
SECTION 01298 SCHEDULE OF VALUES
SECTION 01321 CONSTRUCTION SCHEDULE
SECTION 01322 CONSTRUCTION PROGRESS PHOTOGRAPHY
SECTION 01323 CONSTRUCTION STATUS REPORTS
SECTION 01330 SUBMITTALS
SECTION 01572 EROSION CONTROL PLAN
SECTION 01581 CONSTRUCTION INFORMATION SIGNS
SECTION 01721 MOBILIZATION
SECTION 01722 SURVEYING
SECTION 01732 POTHOLING
SECTION 01740 DEMOBILIZATION
TECHNICAL SPECIFICATIONS
SECTION 02222 PROTECTING EXISTING UNDERGROUND UTILITIES SECTION 02766 CURED-IN-PLACE (CIPP)
Redlands Regular Meeting of 06-20-2023 1022 of 1523
TOC 3
APPENDIX
APPENDIX A CHECKLIST OF LABOR LAW REQUIREMENTS
APPENDIX B CITY OF REDLANDS WORKDAY CONSTRUCTION SCHEDULE
APPENDIX C CCTV VIDEOS
APPENDIX D CITY OF REDLANDS CONTRACTOR SAFETY PROGRAM
APPENDIX E PERMITS
Redlands Regular Meeting of 06-20-2023 1023 of 1523
THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 06-20-2023 1024 of 1523
Redlands Regular Meeting of 06-20-2023 1025 of 1523
Redlands Regular Meeting of 06-20-2023 1026 of 1523
BID DOCUMENTS
(BD)
Redlands Regular Meeting of 06-20-2023 1027 of 1523
THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 06-20-2023 1028 of 1523
BD 1
INSTRUCTIONS TO BIDDERS
For
2022 CIP SEWER PIPELINE REPLACEMENT PROJECT
PROJECT NO. 521029
Bids to receive consideration shall be made in accordance with the following instructions:
1. PROPOSALS:
a. Bids shall be made upon the form of proposal furnished by the City. All Bids shall be properly executed with all items filled in; the signatures of all persons signing shall be in longhand. If the unit price and the total amount named by a Bidder for any item are not in agreement, the unit price shall be considered as representing the Bidder's intention, and the totals may be corrected by the Engineer to conform thereto. If the sum of the individual bid item’s and the total amount named by a Bidder are not in agreement, the sum of the bid item’s shall be considered as representing the Bidder’s intention, and the totals may be corrected by the Engineer to conform thereto. If the total price written in words and the total price written in figures are not in agreement, then the total price written in words will be considered as representing the Bidder’s intention, and the totals will be corrected by the Engineer to conform thereto.
b. Proposals may be rejected if they show any alterations of form, additions not called for, conditional or alternative bids, incomplete Bids, erasures, or irregularities of any kind.
Mistakes shall be lined through and the correct amount written above and initialed by the authorized agent of the Bidder.
c. Bids shall be accompanied by a cashier's or a certified check or Bidder's admitted corporate surety bond, in an amount not less than ten percent (10%) of the bid, made payable to the City of Redlands. Said check or bond shall be given as a guarantee that the Bidder will enter into a contract if awarded the work. In the case of refusal or failure to enter into said Contract, within fourteen (14) days after Notice of Award by the City in writing, the security shall be applied by the City to the difference between such bid and next lowest acceptable bid and surplus, if any, shall be returned to Bidder if cash or check is used, or to Surety if bid bond is used.
d. Before submitting a bid, Bidders shall carefully examine the Plans; read the Specifications; read all other Contract documents; shall visit the site of the work; shall fully inform themselves as to all existing conditions and limitations; and include in the bid a sum to cover the cost of all items included in the Contract. No allowance will be made due to lack of examination or knowledge. The submission of a bid shall be conclusive evidence that the bidder has investigated and is satisfied as to the conditions to be encountered as to character, quality and scope of work to be performed; the quantities of materials to be furnished; and as to the requirements of the Bid Proposal, plans and specifications.
Redlands Regular Meeting of 06-20-2023 1029 of 1523
BD 2
e. Pursuant to CA Labor Code Section 1770 et seq., the successful bidder shall pay not less than the prevailing rate of per diem wages as determined by the Director of the California Department of Industrial Relations. Copies of such prevailing rate of per diem wages are available at http://www.dir.ca.gov/OPRL/PWD/. Copies of the prevailing wage determination are also on file at the City of Redlands and shall be made available to any interested party upon request.
f. The bid must be submitted on or before the date and time specified in the Notice Inviting Sealed Proposals (Bids). The bid shall be submitted in a sealed envelope marked in the lower left corner as follows:
BID FOR: 2022 CIP SEWER PIPELINE
REPLACEMENT PROJECT,
PROJECT NO. 521029
g. Bids will be opened and publicly read aloud at the time set in the Notice Inviting Sealed Proposals (Bids), in the Office of the City Clerk, Civic Center, 35 Cajon Street, Suite 4, Redlands, California.
2. AGREEMENT AND BONDS:
The form of Contract which the successful Bidder, as Contractor, will be required to execute is included in the Contract Documents (CD) of these specifications and should be carefully examined by the Bidder. The Agreement, admitted Corporate Surety Bonds and other documents to be executed by the Contractor shall be executed in original-duplicates stamped according to law, one of which original-duplicates shall be filed with the City Clerk of the City of Redlands. The successful Bidder, simultaneously with the execution of the Agreement, will be required to furnish a faithful performance bond and a labor and material bond, each in an amount equal to one hundred percent (100%) of the Contract price. Said bonds shall provide that if the Contractor or their Subcontractor fails to pay for any materials, provision, provender or other supplies or items used in, upon, for or about the performance of the work contracted to be done, or for any work of labor thereon of any kind, or for amounts due under the Unemployment Insurance Act or Workman's Compensation, with respect to such work or labor, that the surety or sureties will pay for the same. The amount shall not exceed the sum specified in the bond, and also, in case suit is brought upon the bond, a reasonable attorney's fee to be fixed by the court. All bonds shall be secured from surety companies satisfactory to the City of Redlands and whose name is on file with the County Clerk of San Bernardino County, as an approved and financially sound surety company authorized to transact business in this state.
3. WITHDRAWAL OF BIDS:
a. Any Bidder may withdraw his Bid, only by written request, at any time prior to the scheduled time for Bid Opening.
b. No Bidder may withdraw his Bid for a period of sixty (60) days after the time of Bid Opening except as allowed by the California Public Contract Code.
Redlands Regular Meeting of 06-20-2023 1030 of 1523
BD 3
4. INSURANCE AND HOLD HARMLESS REQUIREMENTS:
Before entering into a Contract, the Bidder to whom the Contract has been awarded shall furnish satisfactory evidence that they have secured all required insurance from a responsible insurance company authorized to do business in California and satisfactory to the City, and such insurance shall be maintained in full force and effect at the Contractor's own expense during the life of the Contract. Contractor shall furnish the City with the customary Certificates of Insurance for all required insurance listed below. General Liability Insurance shall name the City and the Consultant, as an additional insured and shall be primary and non-contributing to any insurance or self-insurance maintained by the City. All liability insurance policies shall bear an endorsement or shall have attached a rider whereby it is provided that, in the event of expiration or proposed cancellation of such policies for any reason whatsoever, the City shall be notified by registered mail, return receipt requested, giving sufficient time before the date thereof to comply with any applicable law or statute, but in no event less than forty five (45) days before expiration or cancellation is effective.
The coverage shall provide the following minimum limits based on the type of work proposed under this Contract. The Contractor shall determine if the proposed work requires Tier 1 or Tier 2 Insurance Requirements as follows:
CONTRACTED OPERATIONS DESIGNATED AS TIER 1
Air Conditioning (HVAC)
Systems (installation)
Electric Light or Power Line
Construction Pipeline Construction
Airport Runways (paving,
repaving, etc.) Elevator Work Roofing
Blasting Operations Excavation Sandblasting
Bridge or Elevated Highway
Construction
Fire Suppression Systems
(installation)
Sewer and Water Main
Construction
Buildings Structural Work
(including elevators)
Gas Mains or Connections
Construction Sign Erection (streets)
Building Structure (raising or
moving) Geophysical Exploration Solar Energy
Cable Installation in Conduits
and Conduit Construction
(streets)
Grading of Land Street Cleaning
Caisson or Cofferdam Work Hazardous Materials
Contractors Street or Road Construction
Dam or Reservoir Construction Irrigation or Drainage
Construction
Tank Construction, Installation,
Erection or Repair
Demolition (structures) Landscape Construction (street
or street medians)
Telephone or Cable Line
Construction
Drilling Painting (exterior greater than
single story)
Tree Pruning, Dusting,
Spraying or Removal
Redlands Regular Meeting of 06-20-2023 1031 of 1523
BD 4
TIER 1 DESIGNATED INSURANCE REQUIREMENTS
a. Commercial General Liability
$1 Million Per Occurrence/ $2 Million Aggregate
City listed as an Additional Insured on the coverage
Coverage is primary and non-contributory
If scope of work is within 50 feet of any railroad, endorsement citing inclusion of liability associated with this work is required
If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission b. Business Auto Liability
$1 Million Combined Single Limit
City listed as an Additional Insured on the coverage
Must include liability arising from all owned, leased, hired, and non-owned autos If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission If Contractor or its subcontractors or suppliers haul hazardous material (including, without limitation, waste), Auto Liability insurance must be applicable to all hazardous waste hauling vehicles, and include MCS 90 and CA9948 Endorsements. c. Commercial Umbrella/ Excess Liability
$5 Million Per Occurrence/ Aggregate
City listed as an Additional Insured on the coverage
Coverage is primary and non-contributory
If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission d. Workers Compensation
$1 Million Per Occurrence for Bodily Injury by Accident $1 Million Each Employee for Bodily Injury by Disease $1 Million Policy Limit for Bodily Injury by Accident Waiver of Subrogation in favor of City
If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission e. Pollution Policy (Hazardous Materials) [If Applicable] Required of Projects that involve Demolition and/or Excavation Activities $1 Million Per Occurrence/ $2 Million Aggregate
City listed as an Additional Insured on the coverage
Redlands Regular Meeting of 06-20-2023 1032 of 1523
BD 5
TIER 2 DESIGNATED INSURANCE REQUIREMENTS
a. Commercial General Liability
$1 Million Per Occurrence/ $2 Million Aggregate
City listed as an Additional Insured on the coverage
Coverage is primary and non-contributory
If scope of work is within 50 feet of any railroad, endorsement citing inclusion of liability associated with this work is required
If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission b. Business Auto Liability
$1 Million Combined Single Limit
City listed as an Additional Insured on the coverage
Must include liability arising from all owned, leased, hired, and non-owned autos If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission If Contractor or its subcontractors or suppliers haul hazardous material (including, without limitation, waste), Auto Liability insurance must be applicable to all hazardous waste hauling vehicles, and include MCS 90 and CA9948 Endorsements. c. Workers Compensation
$1 Million Per Occurrence for Bodily Injury by Accident $1 Million Each Employee for Bodily Injury by Disease $1 Million Policy Limit for Bodily Injury by Accident Waiver of Subrogation in favor of City
If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission d. Pollution Policy (Hazardous Materials) [If Applicable] Required of Projects that involve Demolition and/or Excavation Activities $1 Million Per Occurrence/ $2 Million Aggregate
City listed as an Additional Insured on the coverage
CONTRACTED OPERATIONS DESIGNATED AS TIER 2
Air Conditioning (HVAC)
Systems (service and repair) Carpentry (building interiors) Fire Suppression Systems (service and repair) Alarms and Alarm Systems Communications Equipment
Installation (interior) Landscape Construction
Building Interior Work (service,
repair and non-structural
remodeling)
Driveway, Parking Area or
Sidewalk (paving or repaving) Painting (exterior)
Cable Installation in Conduits
(buildings) Fence Erection All Other Job Types including Vendors Redlands Regular Meeting of 06-20-2023 1033 of 1523
BD 6
Contractor expressly waives all rights to subrogation against the City, its officers, employees and volunteers for losses arising from work performed by Contractor for City by expressly waiving Contractor’s immunity for injuries to Contractor’s employees and agrees that the obligation to indemnify, defend and hold harmless provided for in this Agreement extend to any claim brought by or on behalf of any employee of Contractor. This waiver is mutually negotiated by the parties. Thisshall not apply to any damage resulting from the sole negligence of City, its agents and employees. To the extent any of the damages referenced herein were caused by or resulted from the concurrent negligence of City, its agents or employees, the obligations provided herein to indemnify, defend and hold harmless are valid and enforceable only to the extent of the negligence of contractor, its officers, agents and employees.
Subcontractors. The prime contractor shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsements from each subcontractor.
The Contractor shall not assign or sublet the contract, in whole or in part, without the written consent of the City, nor shall the contractor assign any monies due to, or to become due to, Contractor hereunder without prior written consent of the City.
The Contractor shall be fully responsible to the City for the acts and omissions of the subcontractor and persons either directly or indirectly employed by the Contractor. Consent to subcontracting part of the work shall, in no way, release the Contractor from responsibility for performance of the work, and Contractor will be held, in all respects, accountable for the same as if no consent had been given. The Contractor shall give personal attention to this work which is sublet. Nothing contained in the contract documents shall create any contractual relation between any subcontractor and the City.
Hold Harmless and Indemnification. Contractor shall indemnify, hold harmless and defend City and its elected officials, agents and employees and the Consultant from and against any and all claims, losses or liability, including attorney’s fees, arising from injury or death to persons or damage to property occasioned by any act, omission or failure to act of Contractor, its subcontractors, and any officers, agents and employees in performing the work required by this Agreement. Contractor’s obligations under this provision shall not be limited in any way by any terms of this Agreement, or the insurance limits.
5. LICENSES AND PERMITS:
No bid will be accepted from a Contractor who is not licensed in accordance with the law under the provisions of Division III, Chapter 9 of the Business and Professions Code of the State of California.
The Contractor shall, at the time of bid opening, possess a valid "Class A" Contractor's license, and provide its California State Contractor’s License number to the City.
All subcontractors listed at the time of bid opening shall possess a valid Contractor’s license for the work in which they are specified to complete within the Bid Submittal Package.
Redlands Regular Meeting of 06-20-2023 1034 of 1523
BD 7
The Contractor shall, prior to Notice to Proceed, procure all other permits and licenses as stipulated in the GENERAL CONDITIONS.
In addition, no contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015 or awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5.
Contractors shall submit proof of registration status with their bid submission to the City of Redlands. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.
6. SUBSTITUTION OF SECURITIES:
In accordance with applicable provisions of State law, the Contractor will be permitted to substitute qualified securities in lieu of retention of withheld progress payments by the Owner.
7. SUBCONTRACTORS:
Pursuant to Section 4105 of the California Public Contract Code, the bidder may not circumvent the requirement to list subcontractors by the device of listing one subcontractor, who in turn sublets portions constituting a majority of the work covered by the contract.
A. Pursuant to California Government Code section 4106, subcontractors who will perform work or labor or render services in an amount in excess of one-half of one percent of the Contractor’s total bid shall be set forth in a list of subcontractors within the bid documents. Such list shall be accompanied by an experienced statement with pertinent information regarding similar projects and other evidence of qualifications for each such subcontractor, supplier, individual, or entity if requested by City. If City or engineer, after doing an investigation, has reasonable objection to any proposed subcontractor, supplier, individual, or entity, City may, before the notice of award is given, request the apparent successful bidder to submit a substitute, without an increase in the bid.
B. If the apparent successful bidder declines to make any such substitution, City may award the contract to the next lowest bidder that proposes to use acceptable subcontractors, suppliers, individuals, or entities declining to make the request and substitutions will not constitute grounds for forfeiture of the bid security of any bidder. Any subcontractor, supplier, individual or entity so listed and against which City makes no written objection prior to the giving of the notice of award will be deemed acceptable by City subject to verification of such assessments after the effective date of the agreement as provided herein.
8. NON DEBARRED CONTRACTORS AND SUBCONTRACTORS
The Contractor and all of its subcontractors shall, at the time of bid opening and for performance of this public works contract, be non-debarred contractors and not be ineligible Contractors pursuant to Public Contract Code section 6109 and Labor Code sections 1777.1 and 1777.7.
Redlands Regular Meeting of 06-20-2023 1035 of 1523
BD 8
9. LABOR LAW REQUIREMENTS
Prior to the start of construction, the Contractor and each subcontractor shall submit to the City an executed Checklist of Labor Law Requirements, included within Appendix A, certifying that each Contractor and Subcontractor will comply with the foregoing Labor Law requirements; and fully understands that failure to comply with these requirements will subject it to the penalties cited herein.
By submitting a bid, the prime contractor and subcontractors involved in this project assure that they intend to comply with the labor law requirements noted within Appendix A, fully understanding that failure to comply may subject them to penalties as noted.
10. BID PROTEST PROCEDURES
Any bid protest must be in writing and received by the City Clerk’s Office at 35 Cajon Street, Suite 4, Redlands, CA 92373, before 5:00 p.m. no later than two working days following the bid opening (the “Bid Protest Deadline”) and must comply with the following requirements:
10.1 General. Only a bidder who has actually submitted a Bid Proposal is eligible to submit a bid protest against another bidder. Subcontractors are not eligible to submit bid protests. A bidder may not rely on the bid protest submitted by another bidder, but must timely pursue its own protest. If required by City, the protesting bidder must submit a nonrefundable fee in the amount specified by City, based upon City’s reasonable costs to administer the bid protest. Any such fee must be submitted to City no later than the Bid Protest Deadline, unless otherwise specified. For purposes of this Section, a “working day” means a day that City is open for normal business, and excludes weekends and holidays as observed by the City.
10.2 Protest Contents. The bid protest must contain a complete statement of the basis for the protest and all supporting documentation. Material submitted after the Bid Protest Deadline will not be considered. The protest must refer to the specific portion or portions of the Contract Documents upon which the protest is based. The protest must include the name, address, email address, and telephone number of the person representing the protesting bidder if different from the protesting bidder.
10.3 Copy to Protested Bidder. A copy of the protest and all supporting documents must be concurrently transmitted by fax or by email, by or before the Bid Protest Deadline, to the protested bidder and any other bidder who has a reasonable prospect of receiving an award depending on the outcome of the protest.
10.4 Response to Protest. The protested bidder may submit a written response to the protest, provided the response is received by the City Clerk’s Office before 5:00 p.m., within two working days after the Bid Protest Deadline or after actual receipt of the bid protest, whichever is sooner (the “Response Deadline”). The response must include all supporting documentation. Material submitted after the Response Deadline will not be considered. The response must include the name, address, email address, and telephone number of the person representing the protested bidder if different from the protested bidder.
Redlands Regular Meeting of 06-20-2023 1036 of 1523
BD 9
10.5 Copy of Protesting Bidder. A copy of the response and all supporting documents must be concurrently transmitted by fax or by email, by or before the Bid Protest Deadline, to the protesting bidder and any other bidder who has a reasonable prospect of receiving an award depending upon the outcome of the protest.
10.6 Exclusive Remedy. The procedure and time limits set forth in this section are mandatory and are the bidder’s sole and exclusive remedy in the event of a bid protest. A bidder’s failure to comply with these procedures will constitute a waiver of any right to further pursue a bid protest, including filing a Government Code Claim or initiation of legal proceedings.
10.7 Right to Award. The City Council reserves the right to award the Contract to the bidder it has determined to be the responsible bidder submitting the lowest responsive bid, and to issue a notice to proceed with the Contract notwithstanding any pending or continuing challenge to its determination.
Redlands Regular Meeting of 06-20-2023 1037 of 1523
BD 10
PROPOSAL
TO: THE CITY OF REDLANDS, SAN BERNARDINO COUNTY, CALIFORNIA herein called the “City”.
Pursuant to and in compliance with your Notice Inviting Bids, and the other documents relating thereto, the undersigned Bidder, having familiarized themselves with the terms of the Contract, the local conditions affecting the performance of the Contract and the cost of the work at the place where the work is to be done, and with the plans thereto, hereby proposes and agrees to perform within the time stipulated, the Contract, including all of its component parts and everything required to be performed, and to provide and furnish any and all of the labor, materials, tools, equipment and all utility and transportation services necessary to perform the contract, and complete in a workmanlike manner, all of the work covered by the contract in connection with the City’s Project identified as 2022 CIP SEWER PIPELINE REPLACEMENT PROJECT
PROJECT NO. 521029
NOTE: Bidders must bid each item in this schedule. All entries in the entire PROPOSAL must be made clearly and in ink. Mistakes shall be lined through and the correct amount written above and initialed by the authorized agent of the Bidder.
BID SCHEDULE
(See “Section 01200 – Measurement and Payment” for Bid Item description) Item
No. Brief Description Estimated Quantity
Unit Price
(If Applicable) Total Price in Figures
1 Mobilization (Maximum 5%
of Total Base Bid Price)
LUMP
SUM N/A $______________________
2 Traffic Control LUMP
SUM N/A $______________________
3 Erosion Control Plan LUMP
SUM N/A $______________________
4 Survey LUMP
SUM N/A $______________________
5 Remove and Replace with 8” SDR 35
PVC Pipe 9,656 LF $_________/LF $______________________ 6 Remove and Replace with 10” SDR 35
PVC Pipe 159 LF $_________/LF $______________________
7 Remove and Replace with 12” SDR 35
PVC Pipe 325 LF $_________/LF $______________________
8 Reconnect Service Laterals 328 EA $_________/EA $______________________ 9 CIPP 8” Pipe 11,094 LF $_________/LF $______________________ 10 CIPP 10” Pipe 595 LF $_________/LF $______________________ Redlands Regular Meeting of 06-20-2023 1038 of 1523
BD 11
BID SCHEDULE (CONTINUED)
(See “Section 01200 – Measurement and Payment” for Bid Item description) Item
No. Brief Description Estimated Quantity
Unit Price
(If Applicable) Total Price in Figures
11 CIPP 12” Pipe 983 LF $_________/LF $______________________ 12 Reestablish Lateral Connections
following CIPP 322 EA $_________/EA $______________________ 13 8”/10” Spot Repair 438 LF $_________/LF $______________________ 14 Lateral Connection Repair 7 EA $_________/EA $______________________ 15 Flow Bypass LUMP
SUM N/A $______________________
16 Testing of CIPP Liner 5 EA $_________/EA $______________________ 17 Demobilization LUMP
SUM N/A $______________________
18 Unforeseen work not covered within all
other bid items
LUMP
SUM N/A $ 200,000.00
BID SCHEDULE TOTAL PRICE $______________________
Last Minute Additions/Deductions*__________________________________________ Bid Item No.________ Last Minute Additions/Deductions*__________________________________________ Bid Item No.________ Last Minute Additions/Deductions*__________________________________________ Bid Item No.________ BID SCHEDULE TOTAL PRICE: $_______________________________________________________ BID SCHEDULE TOTAL PRICE WRITTEN IN WORDS: ________________________________ _______________________________________________________________________________________________ _______________________________________________________________________________________________ * Provision is made here for the Bidder to include an addition or deduction in its bid, if it wishes, to reflect any last-minute adjustments in prices. The addition or deduction, if made, will be proportionately applied to the Progress Payments total for the respective item in the Schedule of Prices, the amount being added or deducted for each monthly payment. The unit prices entered in the Schedule of Prices will not be affected.
LOW BID DETERMINATION:
The low bid will be determined pursuant to Public Contract Code Section 20103.8 as the lowest bid price on the Bid Schedule Total Price on page BD 11. A responsible bidder who submits the lowest bid as determined by the above method shall be awarded the contract, if it is awarded, by the City Council of the City of Redlands.
Redlands Regular Meeting of 06-20-2023 1039 of 1523
BD 12
ADDENDA
Receipt of the following addenda is hereby acknowledged and the same is included in the Bid Price:
Addendum #1___________ Addendum #2___________ Addendum #3____________ (initials) (initials) (initials)
Addendum #4___________ Addendum #5___________ Addendum #6____________ (initials) (initials) (initials) ATTEST: (if Corporation)
(Corporation Seal)
___________________________________ _____________________________________ Company Name Signature
____________________________________ _____________________________________ Address Name
____________________________________ _____________________________________ City, State, Zip Title
Redlands Regular Meeting of 06-20-2023 1040 of 1523
BD 13
BID CERTIFICATION
The undersigned certifies that they are familiar with the various State and local laws affecting labor, length of working days, employer's liabilities, Sunday work, alien labor, domestic materials, Subcontractors, etc.
It is understood and agreed that the work under the contract will be commenced by the undersigned Bidder, if awarded the contract, within ten (10) calendar days from the date in the Notice to Proceed and will be completed by the Contractor in the time set forth in the CONTRACT.
Enclosed find Bidders bond or certified or cashier's check No. _________________ on the __________________________________ Bank, in the amount of ______________________ _______________________ which is not less than ten percent (10%) of the Bid submitted by the undersigned, made payable to the City of Redlands, California and which is given as a guarantee that the Bidder agrees that in case of their default in executing said contract with necessary bonds, the bond or check accompanying this Bid and the money made payable shall become and remain the property of the City of Redlands.
It is understood and agreed that the City of Redlands has the right to waive defects or irregularities and to accept or reject any or all Bids. No Bidder may withdraw their Bid for a period of sixty (60) days after the time of the Bid Opening except as allowed by the California Public Contract Code.
The following information, required by State law under penalty of perjury, is true and correct. Failure to complete this information renders the bid non-responsive, and the bid must be rejected. ____________________________________ _______________________________________ Company Name Signature
____________________________________ _______________________________________ Address Signatory's Title
____________________________________ _______________________________________ City, State, Zip State License Number and Class
____________________________________ _______________________________________ Telephone Number License Expiration Date
Dated this ________________ day of ___________________, 20___.
Redlands Regular Meeting of 06-20-2023 1041 of 1523
BD 14
BID BOND
KNOW ALL PERSONS BY THESE PRESENTS,
That ______________________________________________________________ as Principal, and ______________________________________ as Surety, are held and firmly bound unto the City of Redlands, hereinafter called City, in the sum of ______________________________________ dollars, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents.
WHEREAS, said Principal has submitted a bid to said City to perform all work required under the PROJECT NO. 521029.
NOW, THEREFORE, if said Principal is awarded a contract by said City and, within the time and in the manner required under the heading "Instructions to Bidders" bound with said Specifications, enters into a written contract on the form of agreement bound with said Specifications and furnishes the required bonds, one to guarantee faithful performance and the other to guarantee payment for labor and materials; then this obligations shall be null and void, otherwise it shall remain in full force and effect. In the event suit is brought upon this bond by said City and Judgment is recovered, said Surety shall pay all costs incurred by said City in such suit, including a reasonable attorney's fee to be fixed by the court.
SIGNED AND SEALED, this _________ day of _____________________________, 20____. ______________________________(SEAL) _______________________________(SEAL) (Principal) (Surety)
By:_________________________________ By:__________________________________ (Signature) (Signature)
Address:______________________________
_____________________________________
Telephone (___)________________________
(Seal and Notarial Acknowledgment of Surety)
Redlands Regular Meeting of 06-20-2023 1042 of 1523
BD 15
STATEMENT BY BIDDER
NON-COLLUSION AFFIDAVIT
STATE OF )
) ss
COUNTY OF )
, being first duly sworn, deposes and says that
he is
(Sole Owner, a Partner, President, Secretary, etc.)
of
(Contractor)
the party making the foregoing bid on PROJECT NO. 521029 that such bid is not made in the interest of or on behalf of any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the Bidder has not directly or indirectly induced or solicited any other Bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any Bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the Bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the Bidder or of any other Bidder or to fix any overhead, profit, or cost element of the bid price or of that of another bidder, or to secure any advantage against the public body awarding the Contract of anyone interested in the proposed contract; that all statements contained in such bid are true; and further, that the Bidder has not directly or indirectly, submitted his bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company, association organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid.
By: ______________________________ Title: ________________________________ Subscribed and sworn to before me this day of __________________________, 20 .
Signature of Officer Administering Oath
(Notary Public)
Redlands Regular Meeting of 06-20-2023 1043 of 1523
BD 16
STATEMENT BY BIDDER
OFFICERS OF CORPORATION (Members of Firm)
The names of all persons interested in the foregoing proposals as principals, are as follows:
(IMPORTANT NOTICE - if Bidder or other interested person is a corporation, state legal name of corporation, also names of the president, secretary, treasurer and manager thereof; if a co-partnership, state true name of firm, also names of all individual co-partners composing firm; if Bidder or other interested person is an individual, state first and last names in full). _____________________________________ _____________________________________ _____________________________________ _____________________________________ _____________________________________ _____________________________________ Licensed in accordance with an act providing for the Registration of Contractors, License No. ______________________________________.
Signature of Bidder Dated
NOTE: If Bidder is a corporation, the legal name of the corporation shall be set forth above, together with the signature of the officer(s) authorized to sign contracts on behalf of the corporation; if Bidder is a co-partnership, the true name of the firm shall be set forth above, together with the signature of the partner or partners authorized to sign contracts in behalf of the co-partnership, and if the Bidder is an individual, that signature shall be placed above.
Redlands Regular Meeting of 06-20-2023 1044 of 1523
BD 17
STATEMENT BY BIDDER
SUB-CONTRACTORS LIST
Bidder supplies the following information for any Subcontractor who will perform work or labor or render services to the prime contractor, etc. to be used on PROJECT NO. 521029, all in accordance with Section 4104 of the California Public Contract Code.
LICENSED SUBCONTRACTOR’S NAME
AND BUSINESS ADDRESS
LICENSE #
SPECIFIC
DESCRIPTION
OF SUBCONTRACT
& BID ITEM #
% OF BID
ITEM TO BE
PERFORMED
Redlands Regular Meeting of 06-20-2023 1045 of 1523
BD 18
STATEMENT BY BIDDER
QUALIFICATION AND EXPERIENCE STATEMENT
The following outline is a record of the undersigned Bidder's experience in construction of three (3) projects of a type similar in magnitude and character to that contemplated under PROJECT NO. 521029 within the past two years. Include the location of each project as well as the name, address, and phone number of the owner, and name of individual to contact.
Subcontractors performing in excess of one half of one percent of the prime Contractor’s total bid, or in the construction of streets or highways, one half of one percent of the prime contractor’s total bid or ten thousand dollars ($10,000), whichever is greater shall provide a similar outline.
Additional pages outlining this portion of the Bid may be attached. Failure to provide this statement may result in rejection of the bid by the City of Redlands.
1. Owner's Name:
Contact Person: Phone: ( )
Address of Owner:
Project Description:
Amount of Contract: Completion Date:
2. Owner's Name:
Contact Person: Phone: ( )
Address of Owner:
Project Description:
Amount of Contract: Completion Date:
3. Owner's Name:
Contact Person: Phone: ( )
Address of Owner:
Project Description:
Amount of Contract: Completion Date:
Redlands Regular Meeting of 06-20-2023 1046 of 1523
BD 19
STATEMENT BY BIDDER
GENERAL INFORMATION
1. Bidder's Mailing Address
2. Number of years engaged in the contracting business under your present firm or trade name:
3. Have you ever failed to complete any work awarded to you? (Yes or No) . If yes, provide details in the space provided in Item 10.
4. Have you ever defaulted on a contract? (Yes or No) . If yes, provide details in the space provided in Item 10.
5. Have you ever been a party to a lawsuit or gone to arbitration during the last 5 years? (Yes or No) . If yes, provide details in the space provided in Item 10.
6. Has any Stop Notice been filed against you during the last 5 years? (Yes or No) . If yes, provide details in the space provided in Item 10.
7. Has your contractor's license ever been suspended, revoked, or subject to disciplinary action? (Yes or No) . If yes, provide details in the space provided in Item 10.
8. Contracts currently on hand:
Agency Name Amount of Contract Start Date Completion Date
9. Enter the name of person(s) who inspected the site of the proposed work for your firm and the date of said site inspection.
Name: Date:
Redlands Regular Meeting of 06-20-2023 1047 of 1523
BD 20
10. In the space provided, the Bidder shall provide details concerning any "Yes" answers provided in this "General Information" section. Details shall include, but not be limited to, the nature of dispute, name of the agency involved and the final outcome. If requested by the City, the Bidder shall supply additional information, sufficiently detailed, to permit evaluation of the Bidder's ability to perform the work.
Question
Number Details
Redlands Regular Meeting of 06-20-2023 1048 of 1523
CONTRACT DOCUMENTS
(CD)
Redlands Regular Meeting of 06-20-2023 1049 of 1523
THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 06-20-2023 1050 of 1523
PUBLIC WORK CONSTRUCTION CONTRACT
This Public Work Construction contract (“Contract”) is made and entered into this ___ day of ____________, 2023, by and between the City of Redlands, a municipal corporation, organized and existing under the laws of the State of California (hereinafter “City”), and __________________ (hereinafter "Contractor"). City and Contractor are sometimes individually referred to herein as a “Party” and, together, as the “Parties.”
In consideration of the mutual promises contained herein, City and Contractor agree as follows:
1. SCOPE OF WORK: Contractor shall furnish all materials and will perform all of the work for the following: 2022 CIP SEWER PIPELINE REPLACEMENT PROJECT, complete all items as required by the Contract Documents (as herein defined) and Specifications for City’s 2022 CIP SEWER PIPELINE REPLACEMENT PROJECT, PROJECT NO. 521029 (the “Work”).
2. CONTRACT SUM: City shall pay Contractor the sum of ___________________ dollars ($___________) as consideration for its performance of the Work in accordance with the terms and conditions set forth in the Contract Documents. Pursuant to Public Contract Code Section 22300, Contractor has the option to deposit securities with an escrow agent as a substitute for retention of earnings required to be withheld by City pursuant to an escrow agreement as set forth in Public Contract Code section 22300.
3. TIME FOR COMPLETION: The Work shall be completed within one hundred twenty (120) calendar days from and after the date of City’s issuance of a Notice to Proceed to Contractor.
4. LIQUIDATED DAMAGES: Contractor’s failure to complete the Work within the time allowed will result in damages being sustained by City. Such damages are, and will continue to be, impracticable and extremely difficult to determine. Accordingly, Contractor shall pay to City, or have withheld from monies due to Contractor, the sum of five hundred dollars ($500) for each consecutive calendar day in excess of the specified time for completion of the Work. Execution of this Contract shall constitute agreement by City and Contractor that five hundred dollars ($500) per day is the estimated damage to City caused by the failure of Contractor to complete the work within the allowed time. Such sum is liquidated damages and shall not be construed as a penalty, and may be deducted from payments due Contractor if such delay occurs.
5. CONTRACT DOCUMENTS: This Contract incorporates by reference the following: Notice Inviting Bids, Instructions to Bidders, Contractor’s Proposal, Bid Bond, Agreement, Performance Bond, Labor and Material Bond, Plans, General Conditions, Special Provisions and Specifications, and any addenda thereto (collectively, the “Contract Documents”).
6. ATTORNEYS' FEES: In the event any action is commenced to enforce or interpret the terms or conditions of this Contract, or the Contract Documents, the prevailing Party in such action, in addition to any costs and other relief, shall be entitled to recover its reasonable attorneys’ fees, including fees for use of in-house counsel by a Party.
Redlands Regular Meeting of 06-20-2023 1051 of 1523
CD 2
7. RESOLUTION OF CONSTRUCTION CLAIMS: Claims by Contractor in the amount of three hundred seventy five thousand dollars ($375,000) or less shall be made by Contractor and processed by the City pursuant to the provisions of Part 3, Chapter 1, Article 1.5 of the Public Contract Code (commencing with Section 20104). All claims shall be in writing and include the documents necessary to substantiate the claim. Nothing in subdivision (a) of Public Contract Code Section 20104.2 shall extend the time limit or supersede the notice requirements provided in this case from filing claims by Contractor.
8. ELIGIBILITY OF CONTRACTOR/SUBCONTRACTOR: Contractor and all of its subcontractors shall abide by California Public Contract Code, Section 6109, and California Labor Code Sections 1777.1 and/or 1777.7, and certify that they are not debarred and are eligible to work on this project.
9. ASSIGNMENT OF AGREEMENT: No assignment by a Party of any rights or interests under this Contract shall be binding on another Party without the written consent of the Party sought to be bound.
10. SUCCESSORS AND ASSIGNS: City and Contractor each binds itself and their respective successors and assigns in respect to all covenants, agreements, and obligations contained in the Contract Documents.
11. SEVERABILITY: Any provision or part of the Contract Documents held to be void or unenforceable under any law or regulation shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon City and Contractor.
Redlands Regular Meeting of 06-20-2023 1052 of 1523
CD 3
IN WITNESS WHEREOF, the Parties hereto have executed this Contract the day and year first written above.
CITY OF REDLANDS
(SEAL)
By:___________________________________
Eddie Tejeda, Mayor
ATTEST:
____________________________________
Jeanne Donaldson, City Clerk
(SEAL)
__________________________________________
Name of Contractor
By:_______________________________________
Signature of Authorized Agent
__________________________________________
Title
__________________________________________
Signature of Authorized Agent (if necessary)
__________________________________________
Title
__________________________________________
Contractor's License No.
Redlands Regular Meeting of 06-20-2023 1053 of 1523
CD 4
WORKER'S COMPENSATION INSURANCE CERTIFICATION
Description of Contract: City of Redlands
Municipal Utilities & Engineering Department
2022 CIP SEWER PIPELINE REPLACEMENT PROJECT
PROJECT NO. 521029
Every employer, except the State, shall secure the payment of compensation in one or more of the following ways:
a. By being insured against liability to pay compensation by one or more insurers duly authorized to write compensation insurance in this State. b. By securing from the Director of Industrial Relations, a certificate of consent to self-insure, either as an individual employer, or as one employer in a group of employers, which may be given upon furnishing proof satisfactory to the Director of Industrial Relations of ability to self-insure and to pay any compensation that may become due to his or her employees.
CHECK ONE
_____I am aware of the provisions of Section 3700 of the Labor Code which requires every employer to be insured against liability for Workers’ Compensation or to undertake self-insurance in accordance with the provisions of that Code, and I will comply with such provisions before commencing the performance of the work and activities required or permitted under this Agreement. (Labor Code §1861).
_____I affirm that at all times, in performing the work and activities required or permitted under this Agreement, I shall not employ any person in any manner such that I become subject to the workers’ compensation laws of California. However, at any time, if I employ any person such that I become subject to the workers’ compensation laws of California, immediately I shall provide the City with a certificate of consent to self-insure, or a certification of workers’ compensation insurance.
I certify under penalty of perjury under the laws of the State of California that the information and representations made in this certificate are true and correct.
Dated this day of , 2023.
_____________________________________
(Contractor)
_____________________________________
(Signature)
_____________________________________
(Official Title)
(SEAL)
(Labor Code Section 1861 provides that the above certificate must be signed and filed by the Contractor with the Owner prior to performing the work of the contract.)
Redlands Regular Meeting of 06-20-2023 1054 of 1523
CD 5
FAITHFUL PERFORMANCE BOND
Whereas, the City of Redlands (“City”), State of California, and ______________ (hereinafter designated as "Principal") have entered into an agreement dated _____, 2023 (“Agreement”) whereby Principal agrees to install and complete certain public improvements (the “Work”), which said Agreement is identified as _________________ and is hereby referred to and made a part hereof; and Whereas, said Principal is required under the terms of the Agreement to furnish a bond for the faithful performance of the Work, now, therefore, we, the Principal and, _____________________________, as Surety, are held and firmly bound unto the City in the penal sum of ________________________________ dollars ($_______________) lawful money of the United States, for the payment of which sum we bind ourselves, and our heirs, successors, executors and administrators, jointly and severally, firmly by these presents.
The condition of this obligation is such that if the above bounded Principal, his or its heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions and provisions in the Agreement and any alteration thereof made as therein provided, on his or its part, to be kept and performed at the time and in the manner therein specified, and in all respects according to their true intent and meaning, and shall faithfully fulfill the one-year guarantee of all materials and workmanship, and shall defend, indemnify and save harmless the City and its elected officials, officers, agents and employees, as therein stipulated, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect.
As a part of the obligation secured hereby and in addition to the face amount specified therefor, there shall be included costs and reasonable expenses and fees, including reasonable attorneys’ fees, incurred by the City in successfully enforcing such obligations, all to be taxed as costs and included in the judgment rendered.
As a condition precedent to the satisfactory completion of the Work, the above obligation shall hold good for a period of one (1) year or longer if required by the Agreement after the acceptance of the work by the City, during which time if the Principal shall fail to make full, complete, and satisfactory repair and replacements and totally protect the City from loss or damage made evident during this period from the date of completion of the Work, and resulting from or caused by defective materials or faulty workmanship, the above obligation in penal sum thereof shall remain in full force and effect.
The obligations of Surety hereunder shall continue so long as any obligation of the Principal remains.
Whenever the Principal shall be, and is declared by the City to be, in default under the Agreement, the City having performed the City obligations thereunder, the Surety shall promptly remedy the default, or shall promptly, at the City’s option:
1. Complete the Work in accordance with its terms and conditions; or
2. Obtain a bid or bids for completing the Work in accordance with its terms and conditions, and upon determination by Surety of the lowest responsive and responsible bidder, arrange for a contract between such bidder and the City, and make available as work progresses sufficient funds to pay the cost of completion of the Work less the balance of the Agreement price, but not Redlands Regular Meeting of 06-20-2023 1055 of 1523
CD 6
exceeding, including other costs and damages for which Surety may be liable hereunder, the amount set forth above. The term “balance of the Agreement price,” as used in this paragraph, shall mean the total amount payable to the Principal by the City under the Agreement and any modifications thereto, less the amount previously properly paid by the City to the Principal.
Surety expressly agrees that the City may reject any contractor or subcontractor which may be proposed by Surety in fulfillment of its obligations in the event of default by the Principal.
Surety shall not utilize the Principal in completing the Work nor shall Surety accept a bid from the Principal for completion of the Work if the City, when declaring the Principal in default, notifies Surety of the City’s objection to the Principal’s further participation in the completion of the Work.
No right of action shall accrue on the bond to or for the use of any person or corporation other than the City named herein or the successors or assigns of the City. Any suit under this bond must be instituted within the applicable statute of limitations period.
The said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Agreement or to the work to be performed thereunder or the Specifications accompanying the same shall in any way affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Agreement or to the work or to the specifications.
No final settlement between the City and the Principal shall abridge the right of any beneficiary hereunder whose claim may be unsatisfied.
The Principal and Surety agree that if the City is required to engage the services of any attorney in connection with the enforcement of this bond, each shall pay the City’s reasonable attorneys’ fees incurred, with or without suit, in addition to the above sum.
In witness whereof, this instrument has been duly executed by the Principal and Surety above named, on , 2023.
(SEAL) (SEAL)
(Contractor) (Surety)
BY:
(Signature) (Signature)
Address:___________________________________
__________________________________________
Seal and Notarial Acknowledgment of Surety) Telephone ( )___________________________
Redlands Regular Meeting of 06-20-2023 1056 of 1523
CD 7
LABOR AND MATERIAL BOND
Whereas, the City Council of the City of Redlands, State of California, and ________________ (hereinafter designated as “Principal”) have entered into an agreement (the “Agreement”) whereby Principal agrees to install and complete certain designated public improvements (the “Work”), which said agreement, dated ____________, 2023, and identified as 2022 CIP SEWER PIPELINE REPLACEMENT PROJECT, Project No. 521029 is hereby referred to and made a part hereof; and Whereas, under the terms of the Agreement, Principal is required before commending the performance of the Work, to file a good and sufficient Labor and Material bond with the City of Redlands to secure the claims to which reference is made in Title 3 (commencing with Section 9550) of Part 6 of Division 4 of the Civil Code of the State of California.
Now, therefore, said Principal and the undersigned as corporate surety, are held firmly bound unto the City and all contractors, subcontractors, laborers, material men and other persons employed in the performance of the Agreement and referred to in the aforesaid Code of Civil Procedure in the sum of ______________ dollars ($_____) for materials furnished or labor thereon of any kind, or for amounts due under the Unemployment Insurance Act with respect to such work or labor, that said surety will pay the same in an amount not exceeding the amount hereinabove set forth, and also in case suit is brought upon this bond, will pay, in addition to the face amount thereof, costs and reasonable expenses and fees, including reasonable attorneys’ fees, incurred by the City in successfully enforcing such obligation, to be awarded and fixed by the court, and to be taxed as costs and to be included in the judgment therein rendered.
It is hereby expressly stipulated and agreed that this bond shall insure to the benefit of any and all persons, companies and corporations entitled to file claims under Title 3 (commencing with Section 9550) of Part 6 of Division 4 of the Civil Code, so as to give a right of action to them or their assigns in any suit brought upon this bond.
Should the condition of this bond be fully performed, then this obligation shall become null and void, otherwise it shall be and remain in full force and effect.
The surety hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Agreement or the specifications accompanying the same shall in any manner affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition.
In witness whereof, this instrument has been duly executed by the Principal and surety above named, on _______________________, 2023.
(SEAL) (SEAL)
(Contractor) (Surety)
BY:
(Signature) (Signature)
Address: ______________________________
(Seal and Notarial Acknowledgement of Surety) ______________________________ Telephone: ( )___________________
Redlands Regular Meeting of 06-20-2023 1057 of 1523
THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 06-20-2023 1058 of 1523
GENERAL CONDITIONS
(GC)
Redlands Regular Meeting of 06-20-2023 1059 of 1523
THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 06-20-2023 1060 of 1523
GC 1
GENERAL CONDITIONS
The Standard Specifications for Public Works Constructions, 2021 Edition (Greenbook), together with supplements as published by Building News, Inc., are modified herein and comprise the Standard Specifications. For convenience, the section and subsection numbering system used in these modifications correspond to those used in the Greenbook. Unless specifically deleted or modified herein, all requirements of the Greenbook shall prevail.
SECTION 1 – GENERAL, TERMS, DEFINITIONS, ABBREVIATIONS,
UNITS OF MEASURE, AND SYMBOLS
1-2 TERMS AND DEFINITIONS.
Agency - Amend as follows:
“The legal entity (City) for which the Work is being performed.” Bidder - Amend as follows:
“Any individual, firm, partnership, corporation, or combination thereof, licensed in accordance with the provisions of Chapter 9, Division III of the Business and Professions Code, submitting a Bid for the Work, acting directly or through a duly authorized representative.” City. The City of Redlands, San Bernardino County, California, being the legal entity for which the Work is being performed. Also referred to as Agency or Owner.
City Council. The City Council of the City of Redlands, San Bernardino County, California, being the body authorizing entrance into legal agreements and allowing work in public right-ofway or on public property controlled by the City of Redlands. Also referred to as Board.
Engineer - Amend as follows:
“The City Engineer of the Agency, or other person designated by the City Engineer, acting either directly or through authorized agents.”
Fabricated. An item specifically assembled or made out of selected materials to meet individual design requirements.
Guarantee. See Warranty.
Laboratory. The designated laboratory authorized by the City of Redlands to test materials and work involved in the Contract.
Manufactured. A standard mass-produced unit or item meeting design requirements.
Owner. The City of Redlands, San Bernardino County, California.
Pavement. The uppermost layer of material placed on the traveled way or shoulder. Also referred to as surfacing.
Redlands Regular Meeting of 06-20-2023 1061 of 1523
GC 2
Rain Day. A scheduled working day when you cannot perform work on the controlling activity for at least 50 percent of the day with at least 50 percent of the normal labor and equipment due to adverse weather-related conditions that cause the Contractor to dismiss the crew.
Street - Delete and replace with the following:
“Any road, highway, parkway, freeway, avenue, street, lane, alley, crossing, intersection, court, place, circle, walk, way, or any public right-of-way within the jurisdiction of the Agency.” Surety - Delete and replace with the following:
“An admitted corporate surety as listed by the United States Department of Treasury and duly licensed to conduct business in the State of California and County of San Bernardino and acceptable to the City of Redlands, bound with and for the Contractor for the acceptable performance, execution, and completion of the Work, and for the satisfaction of all obligations incurred.”
Warranty. An extended insurance by the Contractor, of any product or item of work installed as a part of this project for replacement and/or repair for the time period specified, including but not limited to, all parts, labor, materials, tools, equipment costs, etc. necessary for the product or item of work to be in proper and acceptable working condition after completion of the project. For the purposes of this Contract, the period of coverage shall begin on the date of the Notice of Completion filed by the Owner.
Working Hours. Unless specified otherwise, working hours shall be from 7:00 AM to 4:00 PM, Monday through Friday, inclusive. Saturdays, Sundays, and City Holidays, as shown on the current year Construction Schedule, are excluded unless authorized by the City. 1-7.2 CONTRACT BONDS. - Add the following sentence to paragraph 1:
The warranty provisions set forth in Section 7-18 shall be secured by the Contract Performance Bond required under this section and said Bond shall remain in full force and effect for a period of one year from the date of completion as specified in the Notice of Completion.
SECTION 2 - SCOPE OF THE WORK
2-2 PERMITS. - Amend the following:
Amend the first sentence of paragraph 1 as follows:
“The Contractor will obtain all permits necessary to perform the work in streets, highways, railways or other rights-of-way.”
Add the following sentence between the first and second sentences of paragraph 1:
For all work within Caltrans right-of-way, the Contractor shall obtain their own Caltrans Encroachment Permit and pay all necessary permit and inspection fees as required by Caltrans.
Redlands Regular Meeting of 06-20-2023 1062 of 1523
GC 3
Add the following paragraph:
The Contractor shall, prior to the start of work, procure all permits and licenses, including but not limited to, a City Business License for itself, subcontractors, and all parties performing actions associated with this contract within the City of Redlands, City Truck Route Permit, City Street/Lane Closure Permit, City Encroachment Permit, USA Verification Number, DOSH Excavation Permit, other permits required by agencies and/or utilities having jurisdiction on the work, pay all charges and fees required by the City, other agencies and utilities, and give all notices necessary and incidental to the due and lawful prosecution of the work. All City permits associated with this project are no fee to the Contractor.
SECTION 3 - CONTROL OF THE WORK
3-7 CONTRACT DOCUMENTS.
3-7.1 General. – Add the following paragraphs:
Contractor’s working drawings or plans for any structure not included in the plans shall be approved by the Engineer before any work is performed. It is mutually agreed that approval by the Engineer of the Contractor’s working plans does not relieve the Contractor of any responsibility for accuracy of dimensions and details, and that the Contractor shall be responsible for agreement and conformity of their working plans with the approved plans and specifications.
Finished surfaces in all cases shall conform with the lines, grades, cross sections, and dimensions shown on the approved plans. Deviations from the approved plans will be determined by the Engineer and approved in writing. In the event of a discrepancy between any drawing and the figures written thereon, the figures shall be taken as correct.
Should it appear that the work to be done or any matter thereto is not sufficiently detailed or explained by the plans and specification, the Contractor shall apply to the Engineer for such further explanation as may be necessary and shall conform to such explanation or interpretation as part of the Contract so far as may be consistent with the intent of the original plans and specifications. 3-7.1.1 Preconstruction Meeting. The Contractor to whom the contract is awarded, and all his major subcontractors, shall attend a pre-construction meeting. The time and location of said meeting will be set by the City. Contractor will be given adequate notice of such meeting. It shall be the Contractor's responsibility to notify his subcontractors of the time and location of the meeting. All submittals as required under the General Requirements shall be submitted by the Contractor at the time of the meeting.
The Contractor will be provided with an electronic (.PDF file) of the conformed plans and specifications for their use throughout the project. Contractor is responsible for all costs of reproduction.
Progress meetings will be scheduled by the City. The Contractor will be given at least five working days notice of the time and location of said meetings. The Contractor has the responsibility of notifying his subcontractors, suppliers, and fabricators of the time and location of said meetings.
Meetings will be held either at the job site, at the offices of the City of Redlands, or at any other Redlands Regular Meeting of 06-20-2023 1063 of 1523
GC 4
location approved by the City. The Contractor may request, in writing, that a meeting be held.
The City will schedule a meeting at the Contractor’s request not more than five working days after receiving said written notice.
3-7.2 Precedence of Contract Documents. – Replace paragraph 2 with the following:
The precedence shall be (A. being highest, O. being lowest):
A. Permits from other Agencies as may be required by law.
B. Change Orders.
C. Contract.
D. Addenda.
E. Bid Schedule/Proposal.
F. General Requirements.
G. Technical Specifications.
H. Plans.
I. MUED General Permit Conditions and Trench Specifications.
J. City of Redlands Water & Sewer Systems Standard Specifications.
K. General Conditions.
L. City of Redlands Standard Specifications and Detail Drawings for Design and Construction of Public Improvements and all Supplements
M. Standard Specifications for Public Works Construction (SSPWC), 2018 Edition N. Standard Plans for Public Works Construction, 2012 Edition O. Reference Specifications.
3-8.7 Record Drawings. The Contractor shall maintain at the job site, a set of record drawings for the work showing: exact location information of all existing underground utilities encountered, final locations determined in the field, any deviations from the plans and specifications and new work performed within the work area; and all differences between the work as drawn and as installed for all concealed work as well as work added which is not shown on the drawings. Concealed work shall mean all work installed underground or in an area which cannot be readily inspected by use of access panels, inspection plates or other removable features. When vacuum excavation (potholing) services are required, contractor to provide report that identifies depth and alignment of underground utilities.
These record drawings shall be kept current and legible, and shall be available for inspection at all times by the Engineer, Architect and Contractor. All information, changes in the work or work added on these record drawings shall be marked in red. All markings shall use the same legends that are used on the drawings. Indicate locations by exact dimensions and elevations. Give dimensions and elevations from a permanent reference point and prepare all changes to scale.
At the end of construction, the contractor shall prepare one set of marked-up prints of the record drawings indicating any and all revisions and changes to the drawings reflecting As-Built conditions.
The drawings shall also contain a listing of all subcontractors who worked on the construction project.
The As-Built drawings will be submitted to the Municipal Utilities and Engineering Department for review and approval by the City Inspector and Engineer.
The design engineer or City staff shall prepare the final As-Built drawings for record purposes in one of the following two ways: (1) Check out the original drawings from the City and manually revise the Redlands Regular Meeting of 06-20-2023 1064 of 1523
GC 5
drawings to reflect the As-Built condition; or (2) Re-plot the original drawings electronically on 4 mil mylars and make revisions electronically to reflect the As-Built conditions. The final As-Built drawings will be reviewed and approved by the City Inspector and Engineer The construction related bonds will not be released by the City until the As-Built drawings are accepted by the Engineer and all City stipulated conditions for the release of the bonds have been satisfied.
3-10 SURVEYING.
3-10.3 Line and Grade. - Add the following sentences to paragraph 1:
All distances and measurements shown are and will be made in a horizontal plane. Construction line and grade staking shall be set at maximum intervals of 25 feet when the grade is 0.50 percent or greater. Construction line and grade staking shall be set at maximum intervals of 12 feet when the grade is less than 0.50 percent.
3-10.4 Permanent Survey Markers.
The Registered (licensed) Land Surveyor or Registered Civil Engineer authorized to practice land surveying in accordance with all provisions of Section 8771 of the Business and Profession Code shall be hired as a subcontractor or employed by the Contractor. 3-10.5 Survey Service.
Contractor shall be responsible for: furnishing all surveying and staking, horizontal and vertical, as shown on the plans and in accordance with the specifications; furnishing all staking for sub-grade and base course grades per typical sections; replacing any existing monuments and ties which have been destroyed by construction; identifying, locating and tying out all monuments and ties necessary within the work area; and shall reinstall all disturbed monuments and ties, supplying the Engineer with copies of monument and tie sheets recorded with the County Surveyor in accordance with applicable State law. Monuments shall be approved by the Engineer.
Surveying and staking shall be done by a Registered (licensed) Land Surveyor or Registered Civil Engineer authorized to practice land surveying in accordance with all provisions of Section 8771 of the Business and Professions Code.
Unless otherwise specified, stakes will be set and stationed by the Contractor’s surveyor for curbs, headers, sewers, storm drains, structures, rough grade and all other staking necessary for the construction of the work. A corresponding cut or fill to finished grade (or flowline) will be indicated on a grade sheet to be supplied to the Engineer. The Contractor shall dig all holes necessary for line and grade stakes.
3-13 COMPLETION, ACCEPTANCE, AND WARRANTY.
3-13.2 Acceptance. - Add the following paragraphs:
The Contractor shall submit written assertion that the work has been completed prior to the Engineer making final inspection. The Engineer will have 48 hours to inspect the work. If the Engineer determines that the work is not complete, written notice will be given.
Redlands Regular Meeting of 06-20-2023 1065 of 1523
GC 6
Until final acceptance of work by the Engineer, the Contractor shall have charge and care thereof from damage caused by the action of the elements or from any other cause, whether arising from the execution or from the non-execution of the work. The Contractor shall rebuild, repair, restore, and make good all injuries or damage to any portion of the work occasioned by any of the above causes before final acceptance and shall bear the expense thereof.
All work which has been rejected shall be remedied or removed and replaced by the Contractor at their expense with work conforming to the plans and specifications. Any defective material or workmanship which may be discovered before final acceptance or within one year from the date of final acceptance shall be immediately corrected by the Contractor at their expense, notwithstanding that it may have been overlooked in previous inspections and estimates. Failure to inspect work at any stage shall not relieve the Contractor from any obligation to perform sound and reliable work as herein described. It is the Contractor’s ultimate responsibility to deliver a complete, operational project that complies in all details with these specifications, at the time of final acceptance.
Any omission or failure on the part of the City to discover or notify the Contractor of or to condemn defective work or material at the time of construction shall not be deemed as acceptance, and the Contractor will be required to correct defective work or material prior to final acceptance.
The City will endeavor to locate any errors or defective materials or workmanship and call them to the attention of the Contractor prior to subsequent work being performed. However, the City is under no obligation to do so and shall not be held liable because errors or defective material or workmanship by the Contractor are not discovered prior to subsequent work.
Nothing in this section shall be construed to limit the rights of the City to immediately correct conditions which are unsafe or which pose a public health nuisance. Should said corrections later be found to be caused by defective material and/or workmanship, the Contractor and their surety shall reimburse the City for costs reasonably incurred while attending the situation.
In the event it is necessary for the City to file suit to enforce any liability of the Contractor pursuant to this Section, the City shall be entitled to recover from the Contractor, in addition to all other amounts found due and owing, costs of suit and reasonable expenses and fees including reasonable attorneys’ fees incurred by the City in successfully enforcing the Contractor’s obligation, all to be taxed as costs and included in any judgment rendered.
3-13.3 Warranty. - Amend the following:
Amend the first sentence of the paragraph 3:
“The warranty period for specific items covered under manufacturers’ or suppliers’ warranties shall commence from the date of the final acceptance, except where longer warranty periods are specified.” Add the following paragraphs:
All start-up and testing shall be complete, approved and accepted before final acceptance, substantial completion, or beneficial occupancy.
Redlands Regular Meeting of 06-20-2023 1066 of 1523
GC 7
The warranty provided herein shall not be in lieu of, but shall be in addition to any warranties or other obligations otherwise imposed by the specifications or by law. The remedies provided herein shall not be exclusive and the City shall be entitled to any and all remedies provided by law. 3-14 INSPECTION.
The Contractor shall notify the Engineer at least 24 hours in advance before inspection is required.
Whenever the Contractor varies the period during which work is carried on each day, due notice shall be given to the Engineer so that proper inspection may be provided. Varied working hours may be allowed only upon written authorization from the Engineer.
Work financed in whole or in part with funds from another public entity or performed within the jurisdiction of another public entity shall be subject to inspection at all times by authorized representatives of that entity.
The work shall be ready for inspection, whether by City, other public entities or independent testing laboratories, at the scheduled times arranged by the Contractor. If, in the City’s sole judgment, the work is not ready and the inspection must be rescheduled, the Contractor shall be notified. The Contractor shall reschedule the inspection and provide the proper 24 hour notification for the rescheduled inspection. Any costs incurred by the City for rescheduled inspections shall be reimbursed prior to the release of Bonds.
In order to allow for inspection, the Contractor shall notify the City’s inspector sufficiently in advance of the permanent concealment of any materials or work. The City’s inspector shall make the appropriate notifications to other public entities and independent testing laboratories for inspections.
All inspections required in the specifications for this project shall be coordinated through the City’s inspector.
If any work is concealed or performed without the prior notice specified, the work shall be subject to such tests or exposure as may be necessary to prove to the City, Architect and Engineer, that the materials used and the work performed are in conformity with the drawings and specifications. All labor, tools, materials and equipment necessary for exposing and testing shall be furnished by the Contractor at their expense. The Contractor shall replace at their expense, any materials or work damaged by exposure or testing.
Overtime inspection may be requested by the Contractor. Overtime inspection includes but is not limited to, any hours worked outside of the inspector’s normal working hours including weekends and holidays. Such requests shall be on a case-by-case basis as determined by the Engineer. If the Engineer so determines and approves, overtime inspection shall be paid for by the Contractor at the current City billing rate at the time of request or as billed by other public entities or independent testing laboratories. Any costs incurred by the City for overtime inspection shall be reimbursed prior to the release of Bonds.
SECTION 4 - CONTROL OF MATERIALS
4-1 GENERAL. - Delete and replace with the following:
Redlands Regular Meeting of 06-20-2023 1067 of 1523
GC 8
Should any work performed or material furnished under the Contract prove defective or not in accordance with the Plans and Specifications and in the opinion of the Engineer such defect is not of sufficient magnitude or importance to make the work dangerous or unusable, or if the removal of such work isimpracticable or will create dangerous or undesirable conditions, the Engineer at his discretion shall have the right and authority to retain such work instead of requiring it to be removed and reconstructed, but he shall make such deductions therefore in the payment due the Contractor as may be just and reasonable.
4-1.1 Warranty of Title. No materials, supplies or equipment for the work under this Contract shall be purchased subject to any chattel mortgage or under a conditional sale contract or other agreement by which an interest therein or any part thereof is retained by the seller or supplier. The Contractor warrants clear and good title to all materials supplied and equipment installed and incorporated in the work and agrees, upon completion of all work, to deliver the premises, together with all improvements and appurtenances constructed or placed thereon by him, to the Owner free from any claims, liens, encumbrances or charges, and further agrees that neither he nor any person, firm, or corporation furnishing any material or labor for work covered by the Contract shall have any right to a lien upon the premises or any improvement or appurtenance thereon, provided that this shall not preclude the Contractor from installing metering devices or other equipment of utility companies the title of which is commonly retained by the utility company. Nothing contained in this article, however, shall defeat or impair the right of such persons furnishing materials or labor under any bond given by the Contractor for their protection, or any right under any law permitting such persons to look to funds due the Contractor, which are in the hands of the Owner. 4-1.2 Clayton Act. In submitting a bid to the City, if the bid is accepted the Contractor agrees it will assign to the City all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C.
Section 15) or under the Cartwright Act (chapter 2 [commencing with Section 16700] of Part 2 Division 7 of the Business and Professionals Code), arising from purchases of goods, materials, or services by the Bidder for sale to the City pursuant to the bid. Such assignment shall be made and become effective at the time the City tenders final payment to the Bidder.
SECTION 5 – LEGAL RELATIONS AND RESPONSIBILITES
5-1.1 CONTRACTOR’S EQUIPMENT AND FACILITIES.
A noise level limit of 86 dbA at a distance of 15 m (50 feet) shall apply to all construction equipment on or related to the work whether owned by the Contractor or not. The use of excessively loud warning signals shall be avoided, except in those cases required for the protection of personnel. 5-1.2 General.
The enclosed toilets required by this section shall be located within an approved yard, if one is acquired by the Contractor. If a yard is not acquired by the Contractor or the project is not within a City owned property, the toilets must be installed on a trailer and removed from the jobsite each day.
At no times shall toilets be stored within the public right of way outside of working hours.
5-3 LABOR. - Amend the following:
Redlands Regular Meeting of 06-20-2023 1068 of 1523
GC 9
5-3.1 General. - Add the following paragraphs:
Employment of apprentices are required on projects of $30,000 or more. Provisions in Sections 1777.5 of the California Labor Code fixes responsibility of compliance with that section for all apprenticeable occupations with the Contractor. Section 1777.5 provides that the Contractor and every Subcontractor shall submit contract award information to the applicable joint apprenticeship committee. One apprentice hour for every five journeymen hours worked is the minimum State requirement applicable to each apprenticeable trade. Section 1777.7 of said Labor Code provides that the Contractor shall forfeit as a civil penalty the sum of one hundred dollars ($100.00) for each calendar day of noncompliance with provision of said Section 1777.5.
The Contractor will observe all applicable health and safety requirements, including, but not limited to the California and Federal Occupational Safety and Health Acts. The Contractor shall submit for review by the City a Site Specific Health and Safety Plan prior to the commencement of construction activities. This Plan shall meet or exceed the requirements of 29 CFR 1910.120. 5-3.2 Prevailing Wages. - Add the following paragraphs:
Contractors are hereby notified that pursuant to Section 1770 of the Labor Code of the State of California, the City Council of the City of Redlands, California, by Resolution No. 2326, has ascertained the general prevailing rate of hourly wages and rates for legal holidays and overtime work in the locality where this work is to be performed, for each craft or type of workman or mechanic needed to execute the Contract which will be awarded to the successful Bidder. The Contractor shall comply with Sections 1770 to 1780 inclusive of the Labor Code and Master Labor Agreement of Southern California.
The Contractor and each of his subcontractors shall pay each of his employees engaged in work on the project under this Contract in full less legally required deductions and also deductions made pursuant to the regulations prescribed under the so-called “Kick- Back Statute” (48 Sta. 948; U.S.C. 875; 40 U.S.C. 276c).
In accordance with Section 1775 of the California Labor code, Contractor shall forfeit to City, as a penalty, a minimum of $40 for each day, or portion thereof, and a maximum of $200 for each day, or portion thereof, for each worker paid, either by Contractor, or any subcontractor, less than the prevailing rates as determined by the Director of the California Department of Industrial Relations for the work.
Contractor further agrees to fully comply with all applicable provisions of the California Labor Code including but not limited to Sections 1771, 1775, 1776, 1777.5, 1813 and 1815. Failure to abide by prevailing wages and laws by Contractor will be enforced.
The Contractor or subcontractor shall, as a penalty, to the State or political subdivision on whose behalf the contract is made or awarded forfeit twenty-five ($25) dollars for each worker employed in the execution of the contract by the respective contractor or subcontractor for each calendar day during which the worker is required or permitted to work more than 8 hours in any calendar day and 40 hours in any calendar work in violation of Labor Code section 1813. 5-3.3 Payroll Records. – Delete and replace with the following:
Redlands Regular Meeting of 06-20-2023 1069 of 1523
GC 10
The contractor and subcontractors shall submit electronic certified payroll on a weekly basis to the City of Redlands through LCPtracker. LCPtracker is a web-based labor compliance management system. The Prime Contractor and Subcontractors and lower-tier Subcontractors will receive an email from LCPtracker providing their log-on identification and temporary password. The Contractors will need to follow the instructions in the email to set-up their permanent password and activate their account. Once their account is setup, LCPtracker Inc. provides either computer based or web based training. Training can be accessed via the “Book Now” button located under the “Projects” tab. The prime contractor shall submit their certified payroll, along with any subcontractor who is performing any labor, on a weekly basis. The prime contractor is responsible for all communication with their subcontractors and shall submit their subcontractor’s certified payroll as part of their weekly payroll packet. All labor compliance correspondence and submissions will be made through the LCPtracker software.
All certified payroll shall be submitted no later than 7 days from the close of the pay period. The payroll records shall set out accurately and completely the name, social security number, classification and hourly wage rate of each employee, hours worked by employee during the payroll period and a full weekly wages and the actual weekly wages paid to the employee. Such certified payroll records shall be made available at all time for inspection by the City, the Department of Industrial Relations, the Department of Labor or authorized representatives within ten days of request. The contractor and subcontractor shall preserve weekly payroll records for a period of three (3) years from the date of completion of the Contract. In case on noncompliance with said Section 1776 and after a ten-day period following receipt of written notice, the Contractor shall forfeit to the California Department of Industrial Relations one hundred dollars ($100.00) for each calendar day or portion thereof, for each worker in non-compliance, until compliance is effectuated.
In order to meet labor compliance requirements, all contractors will be required to complete eDocuments which are accessed, submitted and approved through LCPtracker. All eDocuments are required to be signed by an owner/officer or authorized signer. The Prime Contractor and each Subcontractor and every lower-tier Subcontractor and any Vendors subject to this provision shall comply with Title 8, Section 16404 of the California Code of Regulations.
A Fringe Benefit Statement shall be submitted with the first payroll and is required for both the prime contractor and any subcontractors. A new Fringe Benefit Statement will be required when general determinations are issued in February and August. Please refer to the DIR website for additional details. Any weeks where no work was performed must be represented by the submittal of a Statement of Non-Performance covering the 7 day pay period where no hours were worked on the site. Final payroll on the project should state “Final” on the certified payroll, and must be marked as such in the LCPtracker system.
Failure by the Contractor to comply with the aforementioned requirements shall result in withheld progress payments until such time certified payroll documents have been received, reviewed, and accepted by the City. The City reserves the right to seek assistance from the State Department of Industrial Relations in determining the acceptability of certified payroll submittals before release of withheld progress payments. Prior to the release of retention monies, all certified payroll must be submitted on the project and any outstanding issues that may have occurred throughout the project must be resolved.
Redlands Regular Meeting of 06-20-2023 1070 of 1523
GC 11
5-4 INSURANCE. - Delete Section 5-4.1, Section 5-4.2 and replace with the following:
Before entering into a Contract, the Bidder to whom the Contract has been awarded shall furnish satisfactory evidence that they have secured all required insurance from a responsible insurance company authorized to do business in California and satisfactory to the City, and such insurance shall be maintained in full force and effect at the Contractor's own expense during the life of the Contract.
Contractor shall furnish the City with the customary Certificates of Insurance for all required insurance listed below. General Liability Insurance shall name the City and the Consultant, as an additional insured and shall be primary and non-contributing to any insurance or self-insurance maintained by the City. All liability insurance policies shall bear an endorsement or shall have attached a rider whereby it is provided that, in the event of expiration or proposed cancellation of such policies for any reason whatsoever, the City shall be notified by registered mail, return receipt requested, giving sufficient time before the date thereof to comply with any applicable law or statute, but in no event less than forty five (45) days before expiration or cancellation is effective.
The coverage shall provide the following minimum limits based on the type of work proposed under this Contract. The Contractor shall determine if the proposed work requires Tier 1 or Tier 2 Designated Insurance Requirements shown below.
TIER 1 DESIGNATED INSURANCE REQUIREMENTS
a. Commercial General Liability
$1 Million Per Occurrence/ $2 Million Aggregate
City listed as an Additional Insured on the coverage
Coverage is primary and non-contributory
CONTRACTED OPERATIONS DESIGNATED AS TIER 1
Air Conditioning (HVAC)
Systems (installation)
Electric Light or Power Line
Construction Pipeline Construction
Airport Runways (paving,
repaving, etc.) Elevator Work Roofing
Blasting Operations Excavation Sandblasting
Bridge or Elevated Highway
Construction
Fire Suppression Systems
(installation)
Sewer and Water Main
Construction
Buildings Structural Work
(including elevators)
Gas Mains or Connections
Construction Sign Erection (streets)
Building Structure (raising or
moving) Geophysical Exploration Solar Energy
Cable Installation in Conduits and
Conduit Construction (streets) Grading of Land Street Cleaning Caisson or Cofferdam Work Hazardous Materials Contractors Street or Road Construction Dam or Reservoir Construction Irrigation or Drainage
Construction
Tank Construction, Installation,
Erection or Repair
Demolition (structures) Landscape Construction (street or street medians)
Telephone or Cable Line
Construction
Drilling Painting (exterior greater than
single story)
Tree Pruning, Dusting, Spraying
or Removal
Redlands Regular Meeting of 06-20-2023 1071 of 1523
GC 12
If scope of work is within 50 feet of any railroad, endorsement citing inclusion of liability associated with this work is required
If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission b. Business Auto Liability
$1 Million Combined Single Limit
City listed as an Additional Insured on the coverage
Must include liability arising from all owned, leased, hired, and non-owned autos If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission If Contractor or its subcontractors or suppliers haul hazardous material (including, without limitation, waste), Auto Liability insurance must be applicable to all hazardous waste hauling vehicles, and include MCS 90 and CA9948 Endorsements. c. Commercial Umbrella/ Excess Liability
$5 Million Per Occurrence/ Aggregate
City listed as an Additional Insured on the coverage
Coverage is primary and non-contributory
If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission d. Workers Compensation
$1 Million Per Occurrence for Bodily Injury by Accident $1 Million Each Employee for Bodily Injury by Disease $1 Million Policy Limit for Bodily Injury by Accident Waiver of Subrogation in favor of City
If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission e. Pollution Policy (Hazardous Materials) [If Applicable] Required of Projects that involve Demolition and/or Excavation Activities $1 Million Per Occurrence/ $2 Million Aggregate
City listed as an Additional Insured on the coverage
CONTRACTED OPERATIONS DESIGNATED AS TIER 2
Air Conditioning (HVAC) Systems
(service and repair) Carpentry (building interiors) Fire Suppression Systems (service and repair) Alarms and Alarm Systems Communications Equipment
Installation (interior) Landscape Construction
Building Interior Work (service,
repair and non-structural
remodeling)
Driveway, Parking Area or
Sidewalk (paving or repaving) Painting (exterior)
Cable Installation in Conduits
(buildings) Fence Erection All Other Job Types including Vendors Redlands Regular Meeting of 06-20-2023 1072 of 1523
GC 13
TIER 2 DESIGNATED INSURANCE REQUIREMENTS
a. Commercial General Liability
$1 Million Per Occurrence/ $2 Million Aggregate
City listed as an Additional Insured on the coverage
Coverage is primary and non-contributory
If scope of work is within 50 feet of any railroad, endorsement citing inclusion of liability associated with this work is required
If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission b. Business Auto Liability
$1 Million Combined Single Limit
City listed as an Additional Insured on the coverage
Must include liability arising from all owned, leased, hired, and non-owned autos If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission If Contractor or its subcontractors or suppliers haul hazardous material (including, without limitation, waste), Auto Liability insurance must be applicable to all hazardous waste hauling vehicles, and include MCS 90 and CA9948 Endorsements. c. Workers Compensation
$1 Million Per Occurrence for Bodily Injury by Accident $1 Million Each Employee for Bodily Injury by Disease $1 Million Policy Limit for Bodily Injury by Accident Waiver of Subrogation in favor of City
If any policy forms of endorsements are cited to grant extension of coverage, they must be included with the Certificate of Insurance submission d. Pollution Policy (Hazardous Materials) [If Applicable] Required of Projects that involve Demolition and/or Excavation Activities $1 Million Per Occurrence/ $2 Million Aggregate
City listed as an Additional Insured on the coverage
Contractor expressly waives all rights to subrogation against the City, its officers, employees and volunteers for losses arising from work performed by Contractor for City by expressly waiving Contractor’s immunity for injuries to Contractor’s employees and agrees that the obligation to indemnify, defend and hold harmless provided for in this Agreement extend to any claim brought by or on behalf of any employee of Contractor. This waiver is mutually negotiated by the parties. This shall not apply to any damage resulting from the sole negligence of City, its agents and employees.
To the extent any of the damages referenced herein were caused by or resulted from the concurrent negligence of City, its agents or employees, the obligations provided herein to indemnify, defend and hold harmless are valid and enforceable only to the extent of the negligence of contractor, its officers, agents and employees.
Redlands Regular Meeting of 06-20-2023 1073 of 1523
GC 14
Subcontractors. The prime contractor shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsements from each subcontractor.
The Contractor shall not assign or sublet the contract, in whole or in part, without the written consent of the City, nor shall the contractor assign any monies due to, or to become due to, Contractor hereunder without prior written consent of the City.
The Contractor shall be fully responsible to the City for the acts and omissions of the subcontractor and persons either directly or indirectly employed by the Contractor. Consent to subcontracting part of the work shall, in no way, release the Contractor from responsibility for performance of the work, and Contractor will be held, in all respects, accountable for the same as if no consent had been given.
The Contractor shall give personal attention to this work which is sublet. Nothing contained in the contract documents shall create any contractual relation between any subcontractor and the City.
Hold Harmless and Indemnification. Contractor shall indemnify, hold harmless and defend City and its elected officials, agents and employees and the Consultant from and against any and all claims, losses or liability, including attorney’s fees, arising from injury or death to persons or damage to property occasioned by any act, omission or failure to act of Contractor, its subcontractors, and any officers, agents and employees in performing the work required by this Agreement. Contractor’s obligations under this provision shall not be limited in any way by any terms of this Agreement, or the insurance limits.
5-4.3 Worker’s Compensation Insurance. - Delete and replace with the following:
A. Contractor shall have worker’s compensation and employer’s liability insurance in force throughout the duration of the contract in an amount which meets the statutory requirement with an insurance carrier acceptable to the City. The insurance policy shall include a provision prohibiting cancellation of said policy except upon forty-five (45) days prior written notice to City. Certificates of Insurance shall be delivered to the City at the time of the Contractors’ execution of the agreement.
B. Contractor expressly waives all rights to subrogation against the City, its officers, employees and volunteers for losses arising from work performed by Contractor for City by expressly waiving Contractor’s immunity for injuries to Contractor’s employees and agrees that the obligation to indemnify, defend and hold harmless provided for in this Agreement extend to any claim brought by or on behalf of any employee of Contractor. This waiver is mutually negotiated by the parties. This shall not apply to any damage resulting from the sole negligence of City, its agents and employees. To the extent any of the damages referenced herein were caused by or resulted from the concurrent negligence of City, its agents or employees, the obligations provided herein to indemnify, defend and hold harmless are valid and enforceable only to the extent of the negligence of contractor, its officers, agents and employees. 5-6 PATENT FEES OR ROYALTIES. Delete and replace with the following:
The Contractor shall include in its Bid the patent fees or royalties on any patented article or process which may be furnished or used in the Work. The Contractor shall indemnify and hold the City Redlands Regular Meeting of 06-20-2023 1074 of 1523
GC 15
harmless from any legal action that may be brought for infringement of patents. The Contractor’s attention is directed to “Notice of Patents, Data, and Copyright Regulations” of the Federal Labor Standards.
The Contractor shall bear all costs arising from the use of patented goods and/or processes used on and/or incorporated into the Work. When use of these goods and/or processes is judged to be an infringement and the use is banned, the Contractor, at its own expense, shall, with concurrence of the Engineer, do one of the following:
A. Secure for the City the right to continue using goods and/or processes by suspension of the injunction or by procuring a license(s);
B. Replace said goods and/or processes with non-infringing goods and/or processes; C. Modify said goods and/or processes so that they become non-infringing; or D. Remove said goods and/or processes and refund the sum paid therefore without prejudice to any other rights of the City.
The preceding shall not apply to any goods manufactured to the detailed design of the City contained in the Contract Documents.
5-7 SAFETY.
5-7.1 Work Site Safety.
5-7.1.1 General. - Amend the following:
Add the following sentences to paragraph 1:
Should watering be the sole method utilized for roadway dust abatement purposes, the maximum time interval that shall elapse between applications thereof shall be no greater than 3 hours during normal working day, supplemented by an additional application thereof immediately prior to the conclusion of the workday and at such other times as may be required, including evenings, weekends and holidays as required by the Engineer. Should the Contractor be unable to furnish dust abatement as specified, the City may perform or cause to be performed the necessary service, the expense of which will be deducted from the payment due the Contractor.
Add the following paragraphs:
To insure the protection of storm drain inlets, Best Management Practices (BMPs) shall be employed during cleanup and dust control operations. Refer to Section 7-8.6.
Compliance with this section is of extreme importance to the City and its citizens. The City may fine the Contractor $1,000 per incident if there are issues with dust, mud, unused equipment or materials and rubbish within the construction area that result in citizen complaints. A 24 hour notice shall be issued to the Contractor and failure to correct the problems will result in the fine being levied. This fine will be in addition to those fines potentially charged for NPDES violations.
Redlands Regular Meeting of 06-20-2023 1075 of 1523
GC 16
5-8 AIR POLLUTION CONTROL.
Dust control shall be performed in accordance with Subsection 7-8 of the Standard Specifications, South Coast Air Quality Management District (SCAQMD) Rule 403, the general Provisions and the following Provision.
Dust resulting from the Contractor’s performance of the work, either inside or outside, the right-ofway shall be controlled by the Contractor. Dust control includes the action necessary to prevent, reduce or control dust within the work area as required to complete the work. The Contractor shall carry out proper and efficient measures to prevent his operations from producing dust in amounts damaging to property or causing a nuisance, or harm to persons living nearby or occupying buildings in the vicinity of the work. The Contractor shall control dust 24 hours a day, seven days a week. The methods to be used for controlling dust in the construction area and along haul roads shall be approved by the Engineer prior to starting any work. The Rule 403 Implementation Handbook published by the SCAQMD, contains a detailed listing of reasonably available dust control measures.
Dust control ordered by the Engineer to be applied on Saturdays, Sundays or holidays will be included in the Contract price for dust control and no additional compensation will be allowed therefore.
The full compensation for all direct and indirect costs incurred for work performed or materials used to control dust resulting from the Contractor’s performance of the work and caused by public traffic, either inside or outside the right-of-way shall be considered as included in the Contract prices paid for the various items of work involved and no additional compensation will be allowed therefore. 5-9 STORAGE OF EQUIPMENT AND MATERIALS.
The Contractor shall be required to provide and maintain as necessary, any additional property required for storage of equipment, materials, etc., to perform work on this project. Should the additional property be located within the city limits of the City of Redlands, the Contractor shall obtain written approval from the City of Redlands Development Services Department and comply with all conditions set therein prior to use. When private property is used for a yard area, the Contractor shall also secure written authorization from the private property owner and supply a copy of such to the City before any monthly progress payment is submitted. Contractor to propose designated areas of the project site, upon approval by the Engineer, suitable for material delivery, storage, and waste collection.
The Contractor shall ensure the construction yard adheres to all local, State and Federal regulations, ordinances, codes and maintained in a neat and orderly manner throughout the duration of the project.
The contractor shall include the construction yard in the Erosion Control Plan or SWPPP and shall be inspected and approved prior to use of the yard. If at any time during the project the location of the construction yard changes from the approved site, the City shall be notified prior to relocation for inspection and approval. Should the Contractor fail to comply with these conditions, the Engineer may suspend the work per SSPWC section 6-3 until the condition is corrected.
Redlands Regular Meeting of 06-20-2023 1076 of 1523
GC 17
At the end of the project or as required, the Contractor shall: clean up and remove all trash and debris, including all organic trash and debris; clean up and remove all hazardous and biochemical wastes from the property to the satisfaction of the agency (City, County, State, or Federal) charged with overseeing these items; and provide to the City a written release from the private property owner that they are satisfied with all clean up and removal work.
5-9.1 Storage in Public Streets.
Construction materials and equipment shall not be stored within public streets or right of way without prior approval from the City. In order to seek approval, Contractor shall submit a location map with all equipment or materials identified including size, duration and any BMP’s installed and provide at least 7 days for review by the City.
5-10 WATER POLLUTION CONTROL.
The Contractor shall follow the City's guidelines for Storm Water Pollution Prevention in providing storm water pollution control at the project site, including the implementation of approved Erosion/Sediment Control Plans during construction as well as the implementation of approved Water Quality Management Plans.
Construction activities disturbing 1 acre or more of land shall comply with the State Water Resources Control Board’s NPDES General Construction Storm Water Permit. A copy of the Notice of Intent (NOI) to include the Waste Discharge Identification (WDID) number shall be submitted as part of the Storm Water Pollution Prevention Plan (SWPPP) to the Engineer for review. Call (909) 782- 4130 for NOI/WDID information.
All projects requiring grading shall submit to the City for review and approval an Erosion/Sediment Control Plan and a Grading Plan. Permit(s) will not be issued until plans are approved and may be revoked if work required in these specifications are not complied with.
Construction sites shall be maintained by implementation of BMPs in such manner that pollutants are not discharged from the site to the maximum extent practicable. A few references available to help with selection and implementation of applicable BMPs are:
1. California Storm Water Best Management Practice Handbook, American Public Works Association, March 1993;
2. The Construction Site Best Management Practices Manual, November 2000;
3. Storm Water Pollution Prevention Plan and Water Pollution Control Program Preparation Manual, November 2000;
4. California Regional Water Quality Control Board’s San Francisco Bay Region, Guidelines for Construction Projects; and
5. California Regional Water Quality Control Board’s San Francisco Bay Region, Erosion and Sediment Control Field Manual, July 1999.
All discharges into the storm drain system are prohibited except for potable water, properly treated discharge, and those discharges specifically approved by the Engineer. The following are some of the prohibited discharges:
Redlands Regular Meeting of 06-20-2023 1077 of 1523
GC 18
1. Discharges that could have an impact on human health or the environment, cause or threaten to cause pollution, contamination, or nuisance;
2. Discharges that exceed any applicable water quality standard contained in a statewide Water Quality Control Plan or local Basin Plan; and
3. Discharges containing hazardous substances equal to or in excess of a reportable quantity listed in Federal regulations 40 CFR, Parts 117 and 302.
Materials that can cause or contribute to pollution or a violation of any applicable water quality standard include, but are not limited to: sediments; solid or liquid chemical spills; wastes from paints, stains, sealants, glues, limes, pesticides or herbicides and wood preservatives or solvents; asbestos fibers, paint flakes or stucco fragments; fuels, oils, lubricants or hydraulic, radiator and battery fluids; fertilizers; vehicle and equipment wash water or concrete wash water; concrete, detergent or floatable wastes; wastes from any engine and equipment steam cleaning or chemical degreasing; and chlorinated potable water line flushings.
Unless exempted or authorized by an NPDES permit, all non-storm water discharges require prior approval by the Engineer or the State Water Resources Control Board with Engineer approval.
During construction, temporary storage of such materials as identified above, must occur in a designated area physically separated from potential storm water runoff, with ultimate disposal in accordance with local, state and federal requirements.
De-watering of contaminated groundwater or discharging contaminated soils via surface erosion is prohibited.
Unless indicated otherwise by the Engineer, all projects, regardless of size, shall submit for review and approval, a Water Quality Management Plan (WQMP). The WQMP shall consist of post construction BMPs which shall remain in effect throughout the life of the facility. Refer to WQMP guidelines.
5-11 TEMPORARY LIGHTS, POWER AND WATER.
Any water drawn from a City fire hydrant shall be via a City owned water meter. Said meter may be obtained from the Municipal Utilities & Engineering Department. Contractor is responsible for payment of a $1200 deposit fee. Said meter shall be returned in a condition like received, less normal wear and tear. All meters are loaned subject to the conditions of the Fire Hydrant Construction Meter Water Service Application. Contractor must provide proposed location of meter and notify Customer Service at (909) 798-7516 each time the meter is relocated during construction. Water reasonably used in connection with the construction contract will be provided at no cost to the Contractor. Water use determined to be wasteful or unreasonable will be charged for at the prevailing rate. 5-12 PROTECTION AND RESTORATION OF EXISTING IMPROVEMENTS.
Redlands Regular Meeting of 06-20-2023 1078 of 1523
GC 19
The Contractor shall relocate, re-establish, repair or replace all existing improvements within the work limits or right-of-way which are not designated for removal (e.g., sprinkler systems, curbs, sidewalks, driveways, fences, walls, signs, utility installations, pavement, structures, etc.) which are damaged or removed as a result of its operations.
Relocations, re-establishments, repairs and replacements shall be at least equal to existing improvements and shall match them in finish and dimension.
All costs to the Contractor for protecting, removing, restoring, relocating, repairing, replacing or reestablishing existing improvements shall be included in the Bid.
The Contractor shall be responsible for the maintenance of the streets and roadways to be used by public and local traffic through and adjacent to the construction zone, from the date of "Notice to Proceed" until the date of acceptance of the completed construction improvements.
Street maintenance shall include filling of potholes, grading of subgrade and base, replacing signs, installing interim pavement striping and markers on the project streets and other side streets within the construction zone. Street maintenance shall also include sweeping and washing of streets, adjacent and connected to the construction zone on a weekly, or more frequent schedule, to prevent the accumulation of dust, dirt, gravel or other deleterious materials, all as necessary to maintain the construction roadways and adjacent streets in a safe, clean and drivable condition for use by public and local traffic.
Upon request from the City for information pertaining to a claim against the contractor, contractor shall provide a written/email response, including all requested information, within 14 calendar days of City’s request. If a response with all requested information is not provided to the City within 14 calendar days, a penalty of $500 per calendar day will be assessed to the Contractor by the City. 5-13 PUBLIC CONVENIENCE AND SAFETY.
5-13.1 General.
The Contractor may be allowed to close the roadway, or a portion thereof, to traffic during normal work hours upon approval from the Engineer. During any closure, the Contractor shall allow access for residents, schools, trash service trucks, churches and businesses within the affected portion of roadway, except as required for construction for a reasonable period of time. The Contractor shall notify residents as noted within Section 5-18.
The Contractor shall provide and install barricades, delineators, warning devices and construction signs in accordance with the Work Area Traffic Control Handbook (WATCH) prepared by the Southern California Chapter of the American Public Works Association. During adverse weather or unusual traffic or working conditions additional devices shall be placed as directed by the engineer.
All traffic signs and devices shall conform to the current State of California, Department of Transportation (CALTRANS), "Manual of Warning Signs, Lights, and Devices for Use in Performance of Work upon Highways", unless otherwise approved by the Engineer.
Redlands Regular Meeting of 06-20-2023 1079 of 1523
GC 20
Fences, barriers, lights and signs shall be furnished, erected and maintained as necessary to give an adequate warning to the public at all times that the work is under construction and of dangerous conditions to be encountered as a result thereof, and warning and directional signs shall also be erected and maintained as may be required by the City. Should the Contractor fail to furnish a sufficient number of traffic and/or pedestrian safety devices within three (3) hours after being notified, the Owner will place such necessary items and the Contractor shall be liable to the Owner for providing such devices in accordance with the following provisions:
1. For placing of barricades - $15.00 per barricade for each day or part thereof.
For flashers - $15.00 per flasher for each day or part thereof.
For traffic cones - $7.50 per cone for each day or part thereof.
2. In the event that the services of the Owner are required outside the normal working hours and/or days or items not noted above are furnished by the City, all costs incurred by the City shall be the responsibility of the Contractor.
The Contractor shall relocate, preserve and maintain the visibility of all signs within the project limits which affect the flow of traffic, as directed by the engineer. Any signs that are missing or found damaged shall be replaced immediately by the Contractor at his expense.
The Contractor shall provide and maintain Class II barricades along excavation edges parallel to the flow of traffic at a spacing of twenty-five feet (25'). Class II barricades mounted with flashers shall be installed around work areas in parkways. Class II barricades shall have alternating black and reflectorized white (or yellow) stripes at an angle of 45 degrees. The stripe with shall be four to six inches.
During paving operations barricades may be supplemented with minimum size eighteen-inch (18") high traffic cones and delineators such that spacing between barricades and/or cones or delineators is no greater than twenty-five feet (25"). At all access points such as intersecting streets, alleys and driveways, barricades and/or cones shall be provided at five-foot (5') intervals so as to prevent vehicular access to the paving area. Where access from an intersecting street is prohibited, a "Road Closed" sign shall be provided. "No Left Turn" sign shall be provided wherever required by the Engineer.
Clearances from traffic lanes shall be 5 feet to the edge of any excavation and 2 feet to the face of any curb, pole, barricade, delineator or other vertical obstruction.
A 4 foot wide pedestrian walkway shall be maintained in the parkway area on each side of all streets, unless otherwise authorized by the Engineer. The minimum clearance from: the edge of pedestrian walkways to any traffic lane shall be 5 feet; the edge of pedestrian walkways to any work zone shall be 3 feet; and the surface of pedestrian walkways to any overhead obstruction shall be 7 feet.
Redlands Regular Meeting of 06-20-2023 1080 of 1523
GC 21
The Contractor shall, at the end of each work day, have backfilled, compacted and placed a temporary drivable roadway surface on all work areas within traveled roadways prior to leaving the job site. Failure to comply to the satisfaction of the Engineer shall result in immediate correction by City forces, and all costs shall be borne by the Contractor.
Traffic control devices shall be marked with the Contractor’s name as appropriate. At no time shall any traffic control devices marked with companies or agencies other than the Contractor or subcontractors, be utilized within the work area.
All said traffic controls and safety devices shall be maintained in clean condition, with any and all graffiti removed by the end of workday on which the graffiti was first reported to the Contractor.
If the traffic control devices are deemed unacceptable by the Engineer due to being damaged, dirty, or marked incorrectly, the Contractor shall replace the traffic control devices immediately. Should the Contractor fail to furnish traffic control devices within three (3) hours after being notified, the Owner will place such necessary items and the Contractor shall be liable to the Owner for providing such devices in accordance with the provisions above.
5-13.1.1 Vehicular Access.
At such times as driveways are inaccessible due to the Contractor's work they shall be blocked by two (2) Class II barricades or one (1) Class II barricades and two (2) delineators. Driveways that are ramped or planked for temporary access shall be provided with a delineator at each side. 5-13.1.2 Signage. The Contractor shall furnish, erect and maintain all construction traffic signage as required and specified.
All construction traffic signage shall be in place prior to commencing any work, placed as needed during construction, moved as necessary and removed only upon completion of all work.
All construction traffic signage and controls shall comply with the State of California Manual of Traffic Controls, Warning Signs, Lights and Devices for use in Performance of Work Upon Highways. All construction traffic signage used in the performance of the work shall be a minimum of the encapsulated lens (high intensity) type. All traffic controls and safety devices, equipment and materials, including but not limited to cones, channelizers, delineators, flashing warning lights, barricades, high level warning devices, telescoping flag trees, flags, signs, markers, portable barriers, flashing arrow signs, changeable message signs, markings and flagging equipment shall be provided and maintained in like new condition.
When a Traffic Signal is constructed as a part of the project, the Contractor shall place and maintain for one calendar month, a message board for each approach leg to a new traffic signal. The message board shall read “CAUTION - NEW TRAFFIC SIGNAL”. The one month period shall begin from the day of activation. This requirement may be lessened or waived, on a case-by-case basis, by the Engineer.
The Contractor shall furnish and properly install, construct, erect, use and continuously inspect and maintain, twenty-four (24) hours per day, seven (7) days per week, including holidays, all said Redlands Regular Meeting of 06-20-2023 1081 of 1523
GC 22
devices, equipment and materials and all temporary and permanent pedestrian and driving surfaces as necessary to provide for the safety and convenience of, and to properly warn, guide, control, regulate, channelize and protect the vehicular traffic, pedestrian traffic, project workers, and the public throughout the entire limits of the work activity and beyond said limits as necessary to include areas affecting or affected by the work, from the date of notice to proceed to the completion and acceptance of the work. Any corrective work required to be performed by City forces shall be charged to the Contractor and paid in full before release of any bonds on the project.
All traffic cones shall be no less than 28 inches in height, except that shorter cones, 12 inches minimum height, may be permitted during striping maintenance operations where the only function of the cone is to separate traffic from the wet paint. All barricades used to delineate traffic at night or placed in or adjacent to the traveled roadway at night, shall be equipped with flashing warning lights.
Channelizers shall be required when lane restrictions, detours or other work conditions need to be maintained for periods longer than normal work hours. Channelizers shall be surface-mounted type and shall be furnished, placed and maintained at the locations shown on the plans or as approved by the Engineer and shall conform to these specifications. Channelizers shall be, at the Contractor’s option, one of the following types, or approved equal: (1) Safe-Hit SH236SMA; (2) Repo “The Replaceable Post”; or (3) Carsonite, “Super Duck” SDF-436.SDF-436. 5-13.2 Traffic Control Plan
The Contractor shall provide a Traffic Control Plan to the agency for approval prior to the scheduled commencement of work. Comments and corrections shall be returned to the Contractor within five (5) working days.
The Contractor shall be required to maintain one lane in each direction when working on the roadway.
Access to schools, businesses, etc. shall be maintained as necessary for their operations. If closures are authorized by the Engineer, all detour signage shall be installed prior to closure of specified portion of roadway(s), and shall be maintained during closure.
The Contractor shall make provision to allow pedestrians full access across work areas at existing crosswalks, while working within those areas.
Traffic controls, including but not limited to vehicular and pedestrian traffic controls, maintenance of vehicular and pedestrian access, detours, and street closures shall be in accordance with Subsection 7-1, of the current edition of the "Standard Specifications for Public Works Construction," including all its subsequent amendments, and the current edition of the "Work Area Traffic Control Handbook." Traffic control and the Traffic Control Plan shall conform to the following:
a. All major streets shall remain open to through-traffic at all times, residential street will be closed to traffic only as long as it takes for material application and drying time.
b. The Traffic Control Plan shall indicate the traffic control requirements for the different types of work to be performed. The Contractor shall be Redlands Regular Meeting of 06-20-2023 1082 of 1523
GC 23
responsible for the preparation of Plans as necessary for specific items of work. These Plans shall be approved by the City's Engineer. c. All traffic controls and safety devices, equipment and materials, including but not limited to cones, delineators, flashing warning lights, barricades, high level warning devices (flag trees), flags, signs, markers, portable barriers, flashing arrow signs, markings, and flagging equipment shall be provided and maintained in "like new" condition.
d. The Contractor shall furnish and properly install, construct, erect, use, and continuously inspect and maintain, twenty-four (24) hours per day, seven (7) days per week, all said devices, equipment and materials and all temporary and permanent pedestrian and driving surfaces as necessary to provide for the safety and convenience of, and to properly warn, guide, control, regulate, channelize and protect the vehicular traffic, pedestrian traffic, project workers, and the public throughout the entire limits of the work activity and beyond said limits as necessary to include area affecting or affected by the work, from the start of work to the completion of the work.
In the event the slurry and cape seal ravels, a "loose gravel" (C6) sign shall be placed to adequately warn the public.
e. High-level warning devices (flag trees) are required at all times for any work being performed within the roadway unless otherwise specifically authorized by the City's Engineer.
f. All barricades shall be equipped with flashing warning lights, and all traffic cones shall be no less than twenty-eight inches (28") in height, except that shorter cones, twelve inches (12") high or higher, may be used during striping maintenance operations where the only function of the cones is to protect the wet paint from the traffic.
g. Type III barricades, no less than six feet (6') in length and equipped with two (2) Type "N" markers each and two (2) flashing warning lights each, shall be used to close streets, except as otherwise specifically authorized in advance by the City's Engineer for minor maintenance work of no more than one (1) working days duration on weekdays, or on holidays only, and between 8:00 a.m. and 3:30 p.m. only. Said barricades shall be placed across the full roadway at each point of closure with the distance between barricades or between barricades and curbs, not exceeding three feet (3'), except that one (1) eleven-foot (11')-wide gap between barricades shall be provided at the center of the street. Barricades to the right of the street's center, facing the inbound vehicular traffic, shall also be equipped with one (1) Type C2 "Road Closed" sign each or one (1) Type C3A "Road Closed to Thru Traffic" sign each.
Redlands Regular Meeting of 06-20-2023 1083 of 1523
GC 24
h. Except for residential streets, as otherwise directed and/or authorized by the City's Engineer, two-way vehicular traffic shall be maintained at all times within two (2) eleven foot (11')-wide lanes on streets, having an effective roadway width of forty-four feet (44') or more with restricted parking, and other streets of lesser widths may be reduced to one (1) twelve-foot (12') wide lane with work activity being limited to one side at a time, and with one-way vehicular traffic being maintained at all times by properly trained and experienced flaggers.
No reduction of the traveled way width shall be permitted on any City street before 8:00 a.m. nor after 3:30 p.m., on weekends or holidays, or when active work is not being done, unless prior authorization to do so is granted by the City's Engineer.
Arrow boards shall be required for all lane closures on major streets. i. Properly trained and experienced flaggers shall be provided to traffic when said traffic is to be interrupted, when two-way traffic is to be reduced to one-way traffic, and at such other times as is necessary to safely pass the traffic through or around the work area, and when so directed by the City's Engineer.
j. Vehicular access to occupied residential property may be restricted on weekdays other than holidays between the hours of 8:00 a.m. to 3:30 p.m. while essential work activity is taking place, with specific prior written approval from the City's Engineer, providing the Contractor gives the owner and/or resident at least forty-eight (48)-hour advance written and oral notice. See Part 2, "Notification of Residents," herein.
Convenient and safe pedestrian access to occupied residential property shall be maintained at all times. Access to mailboxes must be maintained at all time, such that the postal delivery service is not interrupted.
Access to vacant and unused property may be restricted at the Engineer's discretion. Both vehicular and pedestrian access shall be maintained at all times to all other property except as otherwise specifically authorized in writing by the City's Engineer.
k. Any traffic control and safety devices and equipment being used which becomes damaged, destroyed, faded, soiled, misplaced, worn out, inoperative, lost, or stolen shall be promptly repaired refurbished and/or replaced, and any traffic control and safety devices and equipment being used which are displaced or not in an upright position from any cause, shall be promptly returned or restored to their proper position.
Redlands Regular Meeting of 06-20-2023 1084 of 1523
GC 25
l. An unobstructed view of all signs and warning devices including but not limited to stop signs, stop ahead signs, street names signs, and other regulatory, warning and construction signs, markers, and warning devices shall be maintained at all times. No trucks or other equipment or materials shall be stopped, parked, or otherwise placed so as to obscure said signs, markers, and devices from the view of vehicular and/or pedestrian traffic to which it applies.
m. When entering or leaving roadways carrying public traffic, the Contractor's equipment, whether empty or loaded, shall yield to said public traffic at all times, except where the traffic is being controlled by police officers, fire officers, properly trained and experienced flaggers, or at traffic signalized intersections.
n. Stockpiling and/or storage of materials on any public right-of-way or parking areas will not be allowed without specific permission of the Engineer. Materials spilled along or on said right-of-way or parking areas shall be removed completely and promptly. All stockpile and/or storage areas shall be kept in a safe, neat, clean, and orderly fashion, and shall be restored to equal or better than original condition upon completion of the work.
o. Where vehicular access to abutting property must be restricted, the work shall be so selected, arranged, and scheduled that the person(s) requiring access to said abutting property and/or residents along said streets affected will be able to park within a reasonable distance of not more than five hundred feet (500') from their homes and/or destination. Residents must be supplied written notice of such restrictions a minimum of 48 hours in advance.
p. When work has been completed on a particular street or has been suspended or rescheduled, and said street is to be opened to vehicular traffic, all equipment, "NO PARKING" signs, other obstructions, and unnecessary traffic control devices and equipment shall be promptly removed from that street except as otherwise authorized or directed by the City's Engineer. q. Should the Contractor be neglectful, negligent, or refuse, fail, or otherwise be unavailable to promptly, satisfactorily, and fully comply with the provisions specified and referred to hereinabove, the City reserves the right to correct and/or mitigate any situation, which in the sole opinion of the City's Engineer constitutes a serious deficiency and/or serious case of noncompliance, by any means at its disposal at the Contractor's and/or permittee's expense, and will deduct the cost therefore from the Contractor's progress and/or final payment. Such corrective action taken by the City shall not reduce or abrogate the Contractor's legal obligations and liability for proper traffic control and safety measures, and shall not serve to transfer Redlands Regular Meeting of 06-20-2023 1085 of 1523
GC 26
said obligations and liabilities from the Contractor to the City or the City's agents.
r. Violations of any of the above Provisions and/or Provisions of the referenced publications, unless promptly and completely corrected to the satisfaction of the City's Engineer, shall at the sole discretion of the City, be grounds for termination of the Contract, or shut down or partial shutdown of the work, without compensation to the Contractor and/or permittee, or liability to the City, all as prescribed by Contractual obligation or State law, whichever is applicable.
Full compensation for furnishing all labor, materials, tools, equipment, flaggers, lights, channelizers (surface mounted), temporary striping, barricades, portable flashing lights, flashing arrow signs, traffic control and detour plan, and incidentals required to comply with the provisions specified and referred to herein above, to provide all required traffic and pedestrian control for the duration of this contract, all as shown and as specified, shall be paid as specified in Section 01200 of the General Requirements and no other compensation shall be made therefore.
5-13.3 Edison Energized Conductors. The Contractor hereby promises and agrees that in the performance of the Work, he will employ and utilize only qualified persons, as hereinafter defined, to work in proximity to Edison's secondary, primary and transmission facilities. The term "qualified person" is defined as follows:
"Qualified Person". A person by reason of experience or instruction is familiar with the operation to be performed and hazards involved.
Contractor further promises and agrees that the provisions of this paragraph shall be and are binding upon any Subcontractor or Subcontractors that may be retained by it, and that the Contractor shall take such steps as are necessary to insure compliance by said Subcontractor or Subcontractors with the requirements of this paragraph.
5-14 CONTRACTOR’S RESPONSIBILITY FOR DAMAGE.
5-14.1 Responsibility for Damage. The Contractor agrees to and does hereby indemnify, defend and hold harmless the City, its elected officials and the Consultant and their officers, agents and employees from every claim or demand made, and every liability, loss, damage, or expense of any nature whatsoever, including attorney's fees and costs, which may be incurred by reason of:
(a) Liability for damages for (1) death or bodily injury to persons, (2) injury to loss or theft of property, (3) any other loss, damage or expense arising under either (1) or (2) above, sustained by the Contractor or any person, firm or corporation employed by the contractor upon or in connection with the work called for in this agreement, except for the liability resulting from the sole negligence or willful misconduct of the City, its elected officials and their officers, employees and agents who are directly employed by the City and the Consultant; and Redlands Regular Meeting of 06-20-2023 1086 of 1523
GC 27
(b) any injury to or death of persons or damage to property caused by any fault, neglect, default or omission of the Contractor, or any person, firm or corporation employed by the Contractor, either directly or by independent contract, including all damages due to loss or theft, sustained by any person, firm or corporation, including the City, arising out of, or in any way connected with the work covered by this agreement, whether said injury or damage occurs either on or off City property, provided that any of the foregoing (1) is attributable to personal injury, bodily injury, sickness, disease or death, or to injury to or destruction of tangible property (other than the work itself), including the loss of use resulting there from, and (2) is caused in whole or in part by any act or omission of the Contractor, any subcontractor, any supplier, anyone directly or indirectly employed by any of them or anyone for whose act or omissions any of them may be liable, regardless of whether or not caused in part by any act or omission (active, passive, or comparative negligence included, excepting the active negligence of the District) of a party indemnified hereunder.
(c) The Contractor, at its own expense, cost, and risk shall defend any and all actions, suits or other proceedings that may be brought or instituted against the City, its elected officials, officers, agents and employees and the Consultant, against any such claim, demand or liability, and shall pay or satisfy any judgment that may be rendered against the City, its elected officials, officers, agents or employees, in any such action, suit or other proceedings as a result thereof.
5-15 NO PERSONAL LIABILITY. Neither the City Council, the Engineer, the Consultant, nor any other officer or authorized assistant or agent shall be personally responsible for any liability arising under the contract.
5-16 CONTRACTOR'S RESPONSIBILITY FOR WORK. Except as provided above, until the formal acceptance of the Work by the City, the Contractor shall have the charge and care thereof and shall bear the risk of injury or damage to any part thereof by the action of the elements or from any other cause, whether arising from the execution or from the non-execution of the Work. The Contractor shall rebuild, repair, restore, and make good all injuries or damages to any portion of the work occasioned by any of the above causes before final acceptance and shall bear the expense thereof, except such injuries or damages occasioned by act of the federal government or the public enemy.
The City of Redlands shall not be held responsible for the care or protection of any material or parts of the work prior to final acceptance, except as expressly provided in these specifications.
The City shall not be responsible for security of the Contractors equipment or materials at the site.
The City will not be responsible for theft or damage to any property or materials of the Contractor.
Security for Contractor’s property shall be the responsibility of the Contractor. 5-17 WARRANTY OF WORK. The Contractor shall guarantee the Work against defective materials or workmanship for a period of (1) year from the date of completion date specified in the Notice of Completion, except where longer warranty periods are specifically stated. As specified in Section 2-4 in the GENERAL CONDITIONS, the Performance Bond shall remain in full force and effect during the warranty period.
Redlands Regular Meeting of 06-20-2023 1087 of 1523
GC 28
All work which has been rejected, shall be remedied, or removed and replaced, by the Contractor at his own expense, with work conforming to the Plans and Specifications. Any defective material or workmanship which may be discovered before final acceptance or within (1) one year from the completion date specified in the Notice of Completion shall be corrected immediately by the Contractor at his own expense notwithstanding that it may have been overlooked in previous inspections and estimates. Failure to inspect work at any stage shall not relieve the Contractor from any obligation to perform sound and reliable work as herein described. It is the Contractor's ultimate responsibility to deliver at the time of final acceptance a complete project that complies in all details with these Contract Documents. All items shall be ready to operate.
Any omission or failure on the part of the Owner to discover or notify the Contractor of or to condemn defective work or material at the time of construction shall not be deemed an acceptance, and the Contractor will be required to correct defective work or material prior to final acceptance.
The Owner will endeavor to locate any errors or defective materials or workmanship and call them to the attention of the Contractor prior to subsequent work being performed. However, the Owner is under no obligation to do so and shall not be held liable because errors or defective material or workmanship by the Contractor are not discovered prior to subsequent work.
During the (1) one year warranty period, should the Contractor fail to remedy defective material and/or workmanship, or to make replacements within five (5) days after written notice by the Owner, it is agreed that the Owner may make such repairs and replacement and the actual cost of the required labor and materials shall be chargeable to and payable by the Contractor or his Surety.
Nothing in this section shall be construed to limit the rights of the Owner to immediately correct conditions which may be unsafe or which may pose a public health nuisance. Should said conditions later be found to be caused by defective material and/or workmanship, the Contractor and his Surety shall reimburse the Owner for costs reasonably incurred while attending the situation.
In the event it is necessary for the Owner to file suit to enforce any liability of the Contractor pursuant to this sections WARRANTY OF WORK, the Owner shall be entitled to recover from the Contractor, in addition to all other amounts found due and owing, costs of suit and reasonable expenses and fees, including reasonable attorneys' fees, incurred by the Owner in successfully enforcing the Contractor's obligations, all to be taxed as costs and included in any judgment rendered.
The warranty provided herein shall not be in lieu of, but shall be in addition to any warranties or other obligations otherwise imposed by the Contract Document or by law. The remedies provided herein shall not be exclusive and the Owner shall be entitled to any and all remedies provided by law. 5-18 NOTIFICATION OF RESIDENTS/BUSINESSES. The Contractor shall notify all residents, firms, institutions, agencies, and utility companies which may be affected by the work.
Notification shall be by hand delivery of an approved notice within the project limits approved by the City. The notification process shall consist of two notifications, one prior to the start of construction for all properties within the project area and a second notification at least seven days in advance of any activity which may impact each specific property. In the event of any work within the downtown Redlands Regular Meeting of 06-20-2023 1088 of 1523
GC 29
area, the distribution of the second notification shall be at least fourteen days in advance of any activity. Activities impacting said properties and, therefore, requiring the above said notices include the following: the work itself; closure or partial closure of the street; and disallowance of street parking and disallowance of vehicular ingress to or egress from the property.
Said firms, institutions, agencies, and utility companies which must be notified of proposed work shall include, but are not limited to the following: public schools, private schools, day care centers, postal service, hospitals, governmental services, police department, fire department, ambulance services, Omnitrans, solid waste collection, and City street sweeping.
The proposed notice shall be submitted to the Engineer at least seven calendar days prior to the date of distribution for review and approval. The submittal shall also include a map identifying the limits of the work and proposed limits of distribution. The printed notices shall contain a general description of the work to be done, the name of the street with limits, the day and date of the work and the name and telephone number of the Contractor. The notice shall also include a statement that there will be no disruption of trash collection schedules and that trash should be set out by 6:00 a.m. on the scheduled day of pickup. If on-street parking will be affected the notice shall include a statement that no on-street parking will be allowed between the hours of 7:00 a.m. and 5:00 p.m. on the day of work, and a statement that it will be necessary to tow away parked vehicles at the owner's expense per California Vehicle Code CVC 22651L and CVC 22654D.
The Contractor will provide City with the dates and addresses of when project notifications are delivered to affected properties. City will verify the notification process is completed in compliance with the requirements of the specifications. Work will commence when City approves Contractor’s compliance with the requirements set forth in the specifications.
If on-street parking is affected, the Contractor shall also post pre-approved "NO PARKING-TOW WAY" signs on 1 x 2 wood stakes or barricades at one hundred foot (100’) maximum spacing along the affected areas of the street, 48 hours prior to the start of the work. The "NO PARKING-TOW AWAY" signs shall contain the day, date, and hours that parking will be prohibited on that particular street and a statement that parked vehicles will be towed away at owner's expense per California Vehicle Code CVC 22651L and CVC 22654D. The Contractor shall maintain said signs throughout the day of work, and shall start the removal of said signs by 4:00 p.m. and complete the removal by 6:00 p.m. on said day of work or as otherwise directed by the Engineer.
The Contractor shall document the day, date, and time the signs are installed because the no parking restriction cannot be enforced until the signs have been in place 24 hours. Posting of signs on trees, utility poles, light standards and other existing parkway improvement is strictly forbidden.
In the event of street resurfacing operations, the notices to residents shall contain a statement that the street to be resurfaced will be closed to vehicular traffic, and the suggestion that if they require the use of their vehicles on the day of the resurfacing work, they should consider parking their vehicle on a nearby street which is not scheduled for a resurfacing application.
In the event scheduled work is delayed, theContractor shall immediately remove all "NO PARKING" signs. The contractor must notify all previously notified, in person and with printed notices, that the Redlands Regular Meeting of 06-20-2023 1089 of 1523
GC 30
work will be rescheduled and that they will be re-notified 48 hours in advance. The Contractor shall have an adequate supply of approved notifications for distribution to residents.
Full compensation for conforming to these requirements shall be considered as included in the various Contract items of work involved, and no additional compensation will be allowed therefore.
Failure to comply with this section shall result in a penalty assessment imposed of up to $10,000 per violation at the City’s discretion.
SECTION 6 – PROSECUTION AND PROGRESS OF THE WORK
6-1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF WORK. - Add the following paragraph:
Contractor shall notify Underground Service Alert (USA) at 1 (800) 227-2600, two working days prior to starting work, and must submit verification number to the City prior to starting work.
6-1.2 Commencement of the Work. - Amend the second sentence as follows:
“The work shall start within 10 days thereafter, and be diligently prosecuted to completion within the Contract Time.”
6-3 TIME OF COMPLETION.
6-3.1 General. - Add the following sentence:
The time of completion of the Contract shall be expressed in consecutive calendar days. 6-4.1 General. - Add the following paragraphs:
If saturated soil is encountered during construction due to leaks in an existing utility, contractor shall remove saturated material and replace with a suitable backfill material until adequate compaction can be attained by verification from the City's Geotechnical Engineer.
Prior to any removal of saturated material, contractor shall discuss the methods of remediation with the City's representative. Approval from the City, or the City's representative, shall be obtained for any amount of saturated material removal in which the contractor anticipates to be compensated for, if approval is not obtained all costs shall be borne by the contractor.
Up to a 14 day delay in paving operations may be requested after all leaks have been resolved to provide time for excess moisture to dissipate, at no additional cost to the city, in lieu of removing and replacing the saturated soil. A no cost change order will be prepared to provide the contractor with additional contract time if such delay is requested by the City. 6-9 LIQUIDATED DAMAGES. The value of liquidated damages noted in this section is amended to five hundred dollars ($500) per calendar day.
6-10 NOTICE AND SERVICE THEREOF. Any notice required or given by one party to the other under the Contract shall be in writing and shall be dated and signed by the party giving such Redlands Regular Meeting of 06-20-2023 1090 of 1523
GC 31
notice or by duly authorized representative of such party. Any such notice shall not be effective for any purpose whatever unless served in the following manner:
Notice shall be given to the Contractor by personal delivery thereof to said Contractor or to his authorized representative at the project site, or by deposing the same in the United States Mail enclosed in a sealed envelope addressed to said Contractor at the address established for the conduct of work under this Contract, certified and with postage prepaid.
Notice shall be given to the Surety, or any other person, by personal delivery to said Surety or other person, or by depositing the same in the United States Mail, enclosed in a sealed envelope addressed to such Surety or persons at the address of said Surety or persons last communicated by him to the party giving the notice, certified and with postage prepaid.
Notice shall be given to the Owner by personal delivery thereof or by depositing the same in the United States Mail enclosed in a sealed envelope, certified and with postage prepaid. The address of record for the owner is:
City of Redlands
Municipal Utilities & Engineering Department
P.O. Box 3005
35 Cajon Street, Suite 15A
Redlands, CA 92373
6-11 PUBLIC RECORDS ACT. All documents, Plans, specifications and all other information relating to the conduct of the City’s business, including information submitted by the Contractor, shall become the exclusive property of the City and except as provided by law shall be deemed public records. Said information shall be subject to the provisions of the California Public Records Act (Government Code Sections 6250 et seq.).
Under no circumstances will the City be responsible or liable to the Contractor, submitter or any other party for the disclosure of any records or information submitted to the City, regardless of whether such records or information are labeled “Trade Secret”, “Confidential”, or “Proprietary” (or words to similar effect) and regardless of whether the disclosure is required by law or a court order or occurs through inadvertence, mistake, or negligence on the part of the City or its officers, employees, and/or Contractors.
The City will not advise as to the nature or content of documents entitled to protection from disclosure under the California Public Records Act, including interpretations of the Act or the definition of “Trade Secret”. The submitting party shall be solely responsible for all determinations made under the Act, and where appropriate for clearly and prominently marking each and every page or sheet of information with “Trade Secret”, “Confidential”, or “Proprietary”. Each submitting party is advised to contact its own legal counsel concerning the California Public Records Act and its applicability to the submitting party’s own circumstances.
In the event of litigation concerning the disclosure of any information submitted by the submitting party, the City’s sole involvement will be as a stakeholder, retaining the information until otherwise Redlands Regular Meeting of 06-20-2023 1091 of 1523
GC 32
ordered by a court. The submitting party, at its sole expense and risk, shall be responsible for any and all fees and costs for prosecuting or defending any action concerning the information, and shall indemnify and hold the City harmless from all costs and expenses including attorneys’ fees, in connection with such action.
SECTION 7 - MEASUREMENT AND PAYMENT
7-3 PAYMENT.
7-3.2 Partial and Final Payment. - Delete and replace with the following:
The closure date for the purpose of making monthly progress payments shall be assigned by the Engineer during the pre-construction meeting. Payment, less deductions, unearned work and retention, will be made within 30 days of the closure date. If a dispute exists between the City and the Contractor regarding an item included in the Contractor's Monthly Progress Payment Request, progress payments will be withheld until said dispute is resolved, in which case longer period of time will be required to make such payment. No such payment shall be required to be made, when in the judgment of the Engineer, the total value of the work since the last estimate amounts to less than $500.
If, in the opinion of the Engineer, work is not progressing according to the approved schedule, payments may be withheld until the Contractor returns to the approved schedule.
Deductions will be made for: (1) amounts due the Owner for equipment or material furnished or services rendered; (2) amounts due the Owner under the terms of the Contract; (3) amounts of any claims of lien filed with the Owner; (4) accrued amounts of liquidated damages; (5) amounts required to be deducted by Federal, State or local governmental authorities. From the balance thus determined will be deducted the amounts of all previous payments, and the remainder shall constitute the monthly payment due the Contractor.
A retention of five percent (5%) will be withheld from each and every progress payment to the Contractor. This percentage will remain constant throughout the duration of the Contract. The City shall make a progress payment within thirty (30) days after receipt of an undisputed and properly submitted payment request from Contractor pursuant to Public Contract Code section 20104.50.
After completion of the work to the satisfaction of the Engineer, the Engineer shall make a final estimate of the amount of work done. The City shall pay the entire sum so found to be due after deducting there from all previous payments and all amounts to be retained under the provisions of the Contract. All prior partial estimates and payments shall be subject to correction in the final estimate and payment. The final payment shall not be due and payable until the expiration of thirty-five (35) days from and after the recordation of the Notice of Completion filed by the City.
As provided by paragraph 22300 of the California Public Contract Code, the Contractor may substitute securities for any monies withheld by the City to ensure performance under the Contract.
Substitute securities shall be deposited in a financial institution in a form acceptable to the City of Redlands. The financial institution shall be located within the City limits of the City of Redlands.
The Escrow Agreement to be used is set forth in Public Contract Code section 22300. 7-3.3 Delivered Materials. - Delete and replace with the following:
Redlands Regular Meeting of 06-20-2023 1092 of 1523
GC 33
No payment will be made for materials or equipment delivered but not yet incorporated in the work. 7-4.2.6 Extras. Without invalidating the Contract, the City may order extra work or make changes by altering, adding or deducting from the work, the Contract sum being adjusted accordingly and the consent of the Surety being first obtained where necessary or desirable. All the Work of the kind bid upon shall be paid for at the price stipulated on the proposal, and no claims for any extra work or material shall be allowed unless the work is ordered in writing by the engineer and the price is stated in such order.
7-4.2.7 Claims for Extra Costs. No claim for extra work or cost shall be allowed unless the same was done in pursuance of a written order by the Engineer, as aforesaid, and the claim presented with the first estimate after the changed or extra work is done. When work is performed under the terms of the General Conditions, the Contractor shall furnish satisfactory bills, payrolls, and vouchers covering all items of cost and when requested by the City, give the City access to accounts relating thereto.
After completion of the work to the satisfaction of the Engineer, the Engineer shall make a final estimate of the amount of work done. The City shall pay the entire sum so found to be due after deducting there from all previous payments and all amounts to be retained under the provisions of the Contract. All prior partial estimates and payments shall be subject to correction in the final estimate and payment. The final payment shall not be due and payable until the expiration of the thirty-five (35) days from and after the recordation of the Notice of Completion filed by the City.
SECTION 8 - FACILITIES FOR AGENCY PERSONNEL
This section is deleted in its entirety.
SECTION 9 - ASSIGNMENT OF UNFAIR BUSINESS PRACTICES
CLAIMS
9-1. In entering into a public works contract or a subcontract to supply goods, services, or materials pursuant to a public works contract, the Contractor or subcontractor offers and agrees to assign to the City all rights, title and interest and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Sec. 15) or under the Cartwright Act (Chapter 2, commencing with section 16700 of part 2 of division 7 of the Business and Professions Code), arising from the purchase of goods, services, or materials pursuant to this public works agreement. This assignment shall be made and become effective at the time the City tenders final payment to the Contractor, without further acknowledgment by the Parties.
SECTION 10 - TRENCHING AND EXCAVATION
10-1. If this contract involves digging trenches or other excavations that extend deeper than (4) feet below the surface, the following shall be done pursuant to California Public Contract Code Section 7104:
Redlands Regular Meeting of 06-20-2023 1093 of 1523
GC 34
A. That the Contractor shall promptly and before the following conditions are disturbed, notify the City in writing, of any:
(1) Material that the Contractor believes may be material that is hazardous waste, as defined in Section 25117 of the Health and Safety Code, that is required to be removed to a Class I, Class II or Class III disposal site in accordance with provisions of existing law. (2) Subsurface or latent physical conditions differing from those indicated. (3) Unknown physical conditions at the site of any unusual nature, different materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the contract.
B. That the City shall promptly investigate the conditions, and if it finds that the conditions do materially so differ, or do involve hazardous waste, and cause a decrease or increase in the Contractor’s cost of, or the time required for, performance of any part of work shall issue a change order under the procedures described in the contract.
C. That, in the event that a dispute arises between the City and the Contractor whether the conditions materially differ, or involve hazardous waste, or cause a decrease or increase in the Contractor cost of, or time required for, performance of any part of the work, the Contractor shall not be excused from any scheduled completion date provided for by the contract, but shall proceed with all work to be performed under the contract. The Contractor shall retain any and all rights provided either by contract or by law which pertains to the resolution of disputes and protests between the contracting parties.
SECTION 11 - REMOVAL, RELOCATION OR PROTECTION OF
EXISTING UTILITIES
11-1. Pursuant to Government Code Section 4215 et seq, the City shall assume the responsibility between the parties to this contract, for the timely removal, relocation, or protection of existing main or trunk line utility facilities located on the site of the construction project for this contract, if such utilities are not identified by the public agency in the plans and specifications made a part of the invitation for bids.
11-2. The Contractor shall be compensated for the costs of locating, repairing damage not due to the failure of the Contractor to exercise reasonable care, and removing or relocating such utility facilities not identified in the plans and specifications with reasonable accuracy and for equipment on the project necessarily identified during such work.
11-3. The Contractor shall not be assessed liquidated damages for delay in completion of the project, when such delay was caused by the failure of the City, or the owner of the utility to provide for removal or relocation of such utility facilities.
11.4. The City shall not be required to indicate the presence of existing service laterals or appurtenances whenever the presence of such utilities on the site of the construction project can be Redlands Regular Meeting of 06-20-2023 1094 of 1523
GC 35
inferred from the presence of other visible facilities, such as buildings, meter and junction boxes, on adjacent to the site of construction, provided, however, nothing herein shall relieve the City from identifying main or trunk lines in the plans and specifications.
11.5. Nothing herein shall preclude the City from pursuing appropriate remedy against the utility for delays which are the responsibility of the utility.
11.6. If the Contractor, while performing the contract, discovers utility facilities not identified by the City in the contract plans or specifications, Contractor shall immediately notify the City and the utility in writing.
11.7. The public utility, when it is the owner, shall have the sole discretion to perform repairs or relocation work or permit the Contractor to do such repairs or relocation work at a reasonable price.
11.8. Contractor shall comply with Government Code Section 4216 through 4216.9.
11.9. Conduits from existing street light and traffic signal systems may be encountered during construction of this project. All removals, relocations, and/or replacements of existing conduit systems shall be performed in accordance with these specifications and City standards, by a qualified electrical contractor. All costs for said work shall be borne by the Contractor and paid as a part of the various items of work requiring such removals, relocations, and/or replacements, and no other compensation shall be made therefore.
SECTION 200 - ROCK MATERIALS
200-2 UNTREATED BASE MATERIALS.
200-2.1 General. - Amend the first paragraph as follows:
“Materials for use as untreated base or subbase shall be classified in the order of preference as follows:
Crushed Aggregate Base
Crushed Miscellaneous Base
Pulverized Miscellaneous Base.”
200-2.4.1 General. - Delete the second sentence and replace with the following:
“The material shall be free of deleterious material as defined in 200-1.1.” 200-2.4.2 Grading. - Amend the first sentence of paragraph 1 as follows:
“The material shall be uniformly graded and shall conform to the ‘fine’ gradations:” 200-2.5.1 General. - Delete the third sentence and replace with the following:
“The material shall be free of deleterious material as defined in 200-1.1.” 200-2.8.1 General. - Amend as follows:
Delete the second sentence of paragraph 1 and replace with the following:
“Pulverized miscellaneous base may contain underlying base material.” Redlands Regular Meeting of 06-20-2023 1095 of 1523
GC 36
Delete the third sentence of paragraph 1 and replace with the following:
“The material shall be free of deleterious material as defined in 200-1.1.” SECTION 201 - CONCRETE, MORTAR AND RELATED MATERIALS
201-1 PORTLAND CEMENT CONCRETE.
201-1.1.1 General - Add the following paragraph:
The Contractor shall furnish the Engineer in the field with a copy of the mix design to be used, and with a legible certified weighmaster's certificate for each load of PCC delivered to the project.
PCC delivered to the project site having a water content and/or slump greater than that specified in the mix design, shall be rejected and removed from the project site. 201-1.1.2 Concrete Specified by Class and Alternate Class - Amend Table 201-1.1.2.(A) as follows:
Street Surface Improvements section -
All concrete in this section shall have a minimum compressive strength at 28 days of 22,410 kPa (3,250 pounds per square inch), and meet the requirements of class 330-C-23 (560-C-3250) concrete.
Sewer & Storm Drain Facilities section, Sidehill Surface Drainage Facilities subsection - All concrete in this subsection shall have a minimum compressive strength at 28 days of 22,410 kPa (3,250 pounds per square inch), and meet the requirements of class 330-C-23 (560-C-3250) concrete.
201-1.4.3 Transit Mixers. - Replace the first sentence in paragraph 6 with the following:
The total elapsed time between addition of water at the batch plant and the completion of the discharge of the PCC from the mixer, shall not exceed ninety (90) minutes. All PCC remaining in the mixer, after said ninety (90) minutes time limit, shall be rejected and removed from the project site.
SECTION 203 - BITUMINOUS MATERIALS
203-3 EMULSIFIED ASPHALT.
203-3.1 General. - Modify the section by adding the following:
Asphalt emulsion shall be a QUICKSET ANIONIC OR CATIONIC EMULSIFIED ASPHALT conforming to the requirements of Subsection 203-1.3, “Test Reports and Certification”, and Subsection 203-1.2, “Testing Requirements” of the Standard Specifications.
The latex additive shall be Ultra Pave 70 (for anionic) or Ultra Pave 65 K (for cationic) or an approved equal. The latex shall be added at the emulsion plant after weighing the asphalt and before the addition of mixing water. The latex shall be added at a rate of two to two-and-one-half (2 to 225) parts to one-hundred (100) parts of emulsion by volume.
Redlands Regular Meeting of 06-20-2023 1096 of 1523
GC 37
203-5 SLURRY SEAL.
203-5.1 General. - Delete the sentence and replace with the following:
Slurry seal shall be emulsion-aggregate slurry (EAS) conforming to 203-5.4. 203-5.2 Mix Design. - Modify the section by adding the following:
(f) Admixtures, such as Portland Cement or aluminum sulfate may be mixed into the slurry material to adjust curing time such that the applied slurry can support vehicular traffic within 60 minutes.
(g) Use of slag shall not be permitted.
(h) Deliveries of aggregate and emulsion shall not be made without the engineer present.
Emulsion is not to be transferred to an on-site storage tanker without the sieve test performed by the City.
203-5.3.2 Grading. - Delete the sentence and replace with the following:
The combined aggregate gradation shall be determined in accordance with ASTM C136 and conform to Type II requirements shown in Table 203-5.3.2 (A). 203-5.4.1 General. – Modify the paragraph and replace with the following:
EAS shall be a stable mixture of emulsified asphalt, aggregate, water, a set control agent, and latex.
EAS shall be Type II-CQS-1h-EAS.
203-5.4.2.1 Aggregate. – Delete the sentence and replace with the following:
Aggregate shall be Type II conforming to 203-5.3.
203-5.4.2.2 Emulsified Asphalt. – Modify the first paragraph and replace with the following:
Emulsified asphalt shall be quick-set, and contain latex. Quick-set emulsified asphalt shall be CQS-1h conforming to 203-3.
203-6 ASPHALT CONCRETE.
203-6.1 General. - Add the following paragraph:
Unless otherwise approved by the Engineer, asphalt concrete for paving shall be C2-PG 64-10 (1/2”) for finish paving or B-PG 64-10 (3/4”) for base paving. Asphalt concrete for Type D1 or Type D2 curb shall be D2 –PG 70-10.
SECTION 206 - MISCELLANEOUS METAL ITEMS
206-7 TRAFFIC SIGNS.
206-7.1 General. The Contractor shall furnish or relocate and erect all traffic signage as required and specified.
Redlands Regular Meeting of 06-20-2023 1097 of 1523
GC 38
All new traffic signage shall be a minimum of the encapsulated lens (high intensity) type, have an anti-graffiti protective covering and be installed on new posts. All traffic signage to be relocated shall be installed on new posts.
206-7.2 Protective Covering. Anti-graffiti protective covering shall be Type 1150-POF, manufactured by 3M Company, or approved equal.
206-7.3 Post and Base. New posts and bases shall be Ultimate Sign Support System as manufactured by Western Highway, or approved equal.
SECTION 207 – GRAVITY PIPE
207-2 REINFORCED CONCRETE PIPE (RCP).
207-2.1 General. - Add the following sentences to paragraph 2:
The minimum D-load for any RCP shall be 1,350. The minimum size for RCP shall be 18 inches (457 mm) unless otherwise approved by the Engineer.
SECTION 211 - MATERIAL TESTS
211-1 COMPACTION TESTS.
211-1.4 General. The Contractor shall be responsible for all quality control for all work. The Contractor shall complete all necessary testing to ensure the quality requirements within the specifications are achieved. The Contractor shall conduct the compaction testing by a geotechnical engineering firm and the results of the testing shall be made available to the Engineer.
The City will complete assurance testing throughout the project by an independent testing firm.
The City will perform the first compaction test required at any location. If such test does not meet the required specifications, the City will make additional tests until the required compaction is obtained and withhold from the final payment due the Contractor, the cost of all such additional tests. To be acceptable, tests must be ordered and witnessed by the City. Tests will be ordered by the City and performed at a location and depth as directed by the City. The Contractor shall assist the City in performing these tests as necessary. The Contractor shall provide to the City the maximum dry density and the optimum moisture content results of backfill and bedding material when requested by the City.
SECTION 214 - TRAFFIC STRIPING, CURB AND PAVEMENT
MARKINGS, AND PAVEMENT MARKERS
214-4 PAINT FOR STRIPING AND MARKINGS.
214-4.1 General. - Amend the first sentence in paragraph 4 as follows:
“Glass beads conforming to 214-3 shall be mechanically applied at a rate of 0.6 to 0.8 kg of beads per liter (5 to 7 pounds of beads per gallon).”
Redlands Regular Meeting of 06-20-2023 1098 of 1523
GC 39
SECTION 300 - EARTHWORK
300-1 CLEARING AND GRUBBING.
300-1.1 General. - Amend as follows:
Amend paragraph 3 as follows:
“The natural ground surface shall be cleared of all vegetable growth, such as trees, logs, upturned stumps, roots of downed trees, brush, grass, weeds, shrubs, ground cover, tree stumps, decorative landscape rocks, edging, railroad ties, other decorative landscape treatments, boulders, rock, portland cement concrete, and all other objectionable materials, within the limits of construction.” Add the following paragraphs:
Grubbing and removal of organic debris shall include the repair and/or replacement of all parkway irrigation piping and systems necessary to perform work on this Contract and capping pipelines until such time that permanent repairs and/or replacements have been made.
All debris removed from the project site under this item shall be disposed of at an approved dump site. All transportation costs and dump fees shall be borne by the Contractor.
Clearing and Grubbing shall include, but is not limited to, the following:
1. Removal of existing AC berms.
2. Removal of all curb and gutter, cross gutters, and spandrels shall be replaced within three (3) calendar days. The Asphalt Concrete patch for areas with curbs and gutters removed and replaced shall be placed within two (2) working days after the curb and gutter, cross gutters, and spandrels are replaced. Removal of all sidewalks shall be replaced within three (3) calendar days.
3. Saw cut and removal of poles, posts, PCC pavements, curb, gutter, and sidewalk. Holes resulting from removal of existing poles and posts from existing PCC, AC pavements and curbs and gutters, shall be filled or patched with like materials. Self-propelled drop hammers will not be allowed for removals.
4. Removal of all raised pavement markers not conforming to the approved plan or conflicting with the proposed striping as shown on the plans in accordance with Subsection 312-3, Removal, of the Standard Specifications.
5. Removal and disposal of boulders, rock or PCC.
6. All trees and shrubs less than 3m (9 ft) directly above the entire sidewalk surface shall be trimmed and removed by the contractor to allow a clear path of travel for pedestrians.
7. Irrigation system relocation:
Redlands Regular Meeting of 06-20-2023 1099 of 1523
GC 40
Any irrigation systems in conflict with the proposed improvements that are removed, damaged, disturbed, or broken shall be modified, repaired, and/or replaced to be operable and provide full irrigation coverage to the areas requiring irrigation using new materials, equal or better than the original materials, with 20 mm (3/4 in) Schedule 40 PVC being the minimum acceptable for underground lines and 13 mm (1/2 in) Schedule 80 being minimum acceptable for risers and with the systems not being out of operation for more than two (2) days. No payment for work associated with the irrigation repair will be released, until all irrigation is complete, operable and accepted by the City.
All trees, shrubbery and lawns deprived of normal irrigation watering due to a disruption of service caused by the Contractor’s operations shall be regularly and thoroughly irrigated by the Contractor so that said plantings will not be damaged. If any trees, shrubbery or lawns die or suffer unacceptable damage as a result of or precipitated by the Contractor’s operations the Contractor shall replace same with the same plant species and size. Existing grass lawns within areas that must be excavated and/or re-graded shall be cut into approximate 305 mm (1 ft) squares, removed, protected, cared for and replaced as soon as possible. Dead, dying, and unacceptably damaged grass shall be replaced with new grass sod.
8. Existing inlets, slotted drains, drainage pipes, concrete gutters, drainage pipes, where any portion of such structure is within 1m of the grading plane in the excavation areas, or within 300 mm (1 ft) of original ground in embankment areas, or where shown on the plans to be removed, shall be completely removed and disposed of accordingly.
9. Removal and disposal of existing drainage inlet structure and PCC or AC apron.
10. The Contractor shall dispose all materials not being salvaged outside of the right-of-way and shall pay for all costs for disposal.
11.Removal and disposal of any abandoned utilities that may interfere with the improvements.
12.Self-propelled drop hammers will not be allowed for removals. 300-1.3.1 General. - Add the following paragraphs:
The Contractor shall dispose portland cement concrete, stone rubble, and brick at an approved dump site.
All reprocessed asphaltic cement concrete may be placed as the lower course of crushed aggregate base material. If the Contractor chooses not to reprocess the material, disposal at an approved dump site shall be required. All costs for disposal shall be borne by the Contractor. If the Contractor chooses to reprocess material, it shall be protected and remain contaminate-free, otherwise disposal at an approved dump site will be required with all costs borne by the Contractor.
All reprocessed asphaltic cement concrete to be used as crushed aggregate base shall be ground to conform to Section 200-2.2.
Redlands Regular Meeting of 06-20-2023 1100 of 1523
GC 41
300-1.3.2 (a) Bituminous Pavement. - Amend the following:
Amend the second sentence as follows:
“Saw cutting of edges to be joined shall be with a power-driven saw. The groove shall be cut to a minimum depth of 4 inches (102 mm).”
Amend the third sentence as follows:
“Where bituminous pavement is to be removed, a cold mill header cut of maximum 6 feet (1.8 m) in width perpendicular to the join line shall be made, and a minimum laying depth of 1 inch (25mm) of new pavement material shall be provided at the join line.” Amend the fourth sentence as follows:
“The edges of existing concrete pavement adjacent to the trench shall be saw cut to neat straight lines for the purpose of removing the damaged pavement areas.” Add the following sentence:
Work under this item shall include asphalt concrete berms. 300-1.3.2 (b) Concrete Pavement. - Amend the following:
Amend the second sentence as follows:
“Saw cuts shall be made to a minimum depth of 4 inches (102 mm).” Amend the third sentence as follows:
“If a saw cut in concrete pavement falls within 5 feet (1.5 m) of a construction joint, cold joint, expansion joint, or edge, the concrete shall be removed to the joint or edge.” 300-1.3.2 (c) Concrete Curb, Walk, Gutters, Cross Gutters, Driveways and Alley Intersections. - Amend the following:
Amend the first sentence as follows:
“Concrete shall be removed to neatly sawed edges with saw cuts made to a minimum depth of 4 inches (102 mm).”
Amend the third sentence as follows:
“No section to be replaced shall be smaller than 36 inches (1 m) in either length or width.” Amend the fourth sentence as follows:
“If the saw cut in sidewalk or driveway would fall within 36 inches (914 mm) of a construction joint, expansion joint, or edge, the concrete shall be removed to the joint or edge, except that where the saw cut would fall within 12 inches (300mm) of a score mark, the saw cut shall be made in and along the score mark.”
Amend the fifth sentence as follows:
“curb and gutter shall be sawed to a depth of 4 inches (102 mm) on a neat line at right angles to the curb face.”
Redlands Regular Meeting of 06-20-2023 1101 of 1523
GC 42
300-1.3.2 (d) Striping and Markings. All existing striping, markings and raised pavement markers shown to be removed or necessary to be removed from paving areas. This item includes removal in compliance with applicable laws and cleanup of residue from the operation.
All striping, markings and raised pavement markers removed beyond the limits shown on the plans for and/or at the convenience of the Contractor shall be replaced at the Contractor’s expense. 300-1.3.2 (e) Structures. All existing concrete structures (reinforced or non-reinforced) as shown on the plans to be removed or abandoned, including but not limited to, undersidewalk drains, manholes, headwalls, bulkheads, drop inlet structures, energy dissipaters, catch basins, vaults and pipelines. Abandonment shall include all cuts and concrete plugs necessary to seal ends or openings of abandoned pipes or structures.
300-1.3.2 (f) Rock Curbs. All rock from rock curb removals, as shown on the plans or required for construction of the project, shall be transported, delivered and unloaded at a storage site as directed by the Engineer.
300-1.3.2 (g) Miscellaneous Removals. All other removals of facilities, as shown on the plans but not covered under separate bid items, and any underground facilities found during the work and not shown on the plans shall be performed. The City has endeavored to show all known underground facilities but is not responsible for unknown or abandoned facilities. Unknown underground facilities shall be paid as extra work.
300-1.3.2 (h) Miscellaneous Relocations. All relocation work as shown on the plans or required for construction of the project, but not covered under separate bid items, shall be included as a part of Subsection 300-1 Clearing and Grubbing. All relocation work performed as a part of clearing and grubbing work shall conform to the requirements and specifications of the agency or utility having jurisdiction over the item to be relocated.
300-1.4 Payment. - Add the following sentence to paragraph 1:
Payment for work on this item shall be made as a percentage of the work completed at each monthly payment.
300-2 UNCLASSIFIED EXCAVATION.
300-2.2.2 Wet Material. - Amend the second sentence of the paragraph:
“If such high moisture content is not the result of any action on the part of the Contractor, or inaction in protecting the work during the course of the contract, the work involved will be paid for in the following manner: Over-excavation and disposal work shall be considered “extra work,” with backfill and compaction of crushed aggregate base paid under the appropriate bid item in these specifications.”
300-12 MISCELLAENOUS GRADING. The parkway, whether landscaping exists or not, shall be graded and compacted to achieve drainage towards the street at a slope of 2%. Grading shall be coordinated such that it is the last item of work to be completed, prior to site clean-up. Loose Redlands Regular Meeting of 06-20-2023 1102 of 1523
GC 43
material and dirt shall be raked, compacted and distributed throughout the parkway area. Areas adjacent to installed improvements must be graded to a level within one inch from the finished surface. Extra dirt/fill shall be removed from the project in accordance with Specifications.
The Contractor, at his expense shall photo-document pre-construction conditions prior to starting excavating. After construction is completed, the Contractor shall photo-document the finished grade. The Contractor shall provide the City with said photos with addresses identifying each property location, the direction the photograph was taken (facing North, South etc). The Contractor shall keep a copy of the photos (either electronically or hard copy) and provide the City with electronic copies of the photos.
SECTION 301 - TREATED SOIL, SUBGRADE PREPARATION AND
PLACEMENT OF BASE MATERIALS
301-1 SUBGRADE PREPARATION.
301-1.3 Relative Compaction. - Amend the second sentence of paragraph 1 as follows:
“When base material, curb, gutter, alley pavement, driveways, or sidewalks are to be placed on the subgrade material, the top 6 inches (150mm) of such subgrade material shall be compacted to a relative compaction of 95 percent.”
301-2.1 General. – Add the following paragraphs:
The contractor shall use ‘crushed aggregate base’ or ‘crushed miscellaneous base, fine graded’ as the base material. The use of ‘processed miscellaneous base,’ ‘select subbase,’ or ‘disintegrated granite’ shall not be used as base material.
The contractor may use ‘pulverized miscellaneous base’ (grindings) as part of the crushed base material. Said grindings shall be uncontaminated and placed in an even thickness as the lower course of crushed base material. Spreading and compacting shall comply with Sections 301-2.2 and 301-2.3.
301-2.3 Compacting. – Amend the second sentence of paragraph 3 as follows:
“Compaction in the excepted areas shall be as specified in 211-1 with each layer of compacted base material having a minimum relative compaction of 95 percent.” 301-2.4 Measurement and Payment. – Add the following paragraph:
Payment shall be made for cold-planing, storing, placing, and compacting reprocessed asphalt concrete pavement (grindings) as part of the crushed aggregate base (CAB) material. The volume of grindings placed shall be figured and a tonnage figure computed using 9.35 kg/m^3 (150 pounds per cubic foot). This tonnage figure shall be paid as part of the crushed aggregate base tonnage for this project.
301-7 FULL DEPTH RECLAMATION WITH MECHANICAL STABILIZATION (FDR25) Redlands Regular Meeting of 06-20-2023 1103 of 1523
GC 44
301-7.1 Description. This rehabilitation alternative consists of pulverizing the existing asphalt concrete (AC) layer along with the underlying unbound material to a depth of 6, 9 or 12 inches per plan and specifications. The properties of this layer are considered to be similar to an Aggregate Subbase material with a modulus of at least 25 ksi.
The manufacture of the recycled base course shall be done in-place by pulverizing and blending the existing AC layer and base materials, if present. The process shall be accomplished in accordance with these specifications and conform to the lines and grades shown in the plans or as established by the engineer.
301-7.2 Construction. The asphalt concrete surfacing and underlying base materials shall be pulverized such that 100 percent of the material will pass a two-inch sieve and a minimum of 90 percent will pass a one and one-half inch sieve. All materials other than rock and pulverized asphalt concrete shall be broken up such that these materials will pass a one inch sieve. The pulverized materials shall be free of roots, weeds, wood, and construction debris. All grass and other vegetation shall be removed from the edge of the exiting pavement or lip of gutter pan to prevent contamination of the pulverized bituminous material during the milling operation.
Trimming and disposal of excess material, if required, will be performed on the intimate mixture of pulverized asphalt concrete, base materials and subgrade soil. Excess pulverized material is the surplus that results after trimming and grading the pulverized pavement section to the lines and grades matching existing and/or per plans and specifications.
Do not start pulverized roadbed activities if the ambient air temperature is below 40F. If the ambient air temperature falls below 40F, you may only compact and finish pulverized roadbed.
Before starting daily pulverized roadbed activities, sweep the pulverized roadbed area constructed the previous day to remove loose material.
301-7.3 Surface Preparation. Before pulverized roadbed activities start, prepare the existing roadway surface by:
1. Clearing foreign matter including vegetation
2. Removing standing water
3. Referencing the profile and cross slope
4. Marking the proposed longitudinal cut lines on the existing pavement as follows:
4.1. Cut lines must coincide with points where the existing cross slope changes, approximately at the centerline and edge of traveled way
4.2. Cut lines must indicate the sequence of the cuts
5. Referencing existing lane lines and striping layout
Final subgrade surface shall slope away from the street centerline to a maximum of 3% grade.
Pulverized asphalt material must be used as base material to meet new cross slope requirements.
Native sub-grade material may need to be hauled off to allow for the use of all pulverized base material. No additional compensation will be allowed for any sub-grade removal and haul-off if required. Any contaminated material will be removed and disposed of by the contractor off site at his expense. Any shortage of material, caused by premature disposal of the indicated surplus Redlands Regular Meeting of 06-20-2023 1104 of 1523
GC 45
material by the contractor, shall be replaced by it and no additional compensation will be allowed for such replacement.
301-7.4 Spreading, Mixing, and Compacting. Do not use a heating device to soften the pavement. Remove any visible oversized materials in the pulverized roadbed mixture prior to shaping and compacting. If you encounter unstable subgrade or rocks greater than 4 inches in the roadway section, notify the Engineer. The Engineer determines the extent of the unsuitable material and the corrective measures to be taken.
According to the Section 301-2.3, the compaction shall always be commenced along the edge of the area to be compacted and the roller shall gradually advance toward the center of the area to be compacted. Rollers shall be operated along lines parallel or concentric with the centerline of the road being constructed, and no material variation therefrom will be permitted. All rollers must be maintained in good mechanical and working condition.
The relative compaction of each layer of compacted base material shall not be less than 95 percent.
ASTM D2922, Methods of Density of Soil and Soil Aggregate in Place by Nuclear Methods, (or ASTM D1556). After compaction, the sub-grade shall be firm, and unyielding. 301-7.5 Finishing. The finished pulverized roadbed surface must not vary more than 0.05 foot from the lower edge of a 12-foot straight edge laid in directions parallel and perpendicular to the centerline. Variations within the above specified tolerances shall be compensating so that the average grade and cross section specified are met. The finished surface must be free from segregation, tearing, and scarring, and have a uniform surface texture throughout the work limits. 301-8 FULL DEPTH RECLAMATION WITH CEMENT STABILIZATION (FDR-200) 301-8.1 Description. This rehabilitation alternative consists of pulverizing the existing asphalt concrete (AC) layer along with the underlying unbound material to a depth of 6, 9 or 12 inches per plan and specifications. The properties of this layer are considered to be similar to an Aggregate Subbase material with a modulus of at least 200 ksi.
The manufacture of the recycled base course shall be done in-place by pulverizing and blending the existing AC layer and base materials, if present, and adding cement. Micro-cracking of the completed cement stabilized surface is required before HMA is to be placed directly on top of the cement treated surface, regardless of the AC thickness. The process shall be accomplished in accordance with these specifications and conform to the lines and grades shown in the plans or as established by the engineer.
The cement content must be 2% by dry weight of FDR with cement with a dry unit weight of 130 lb/cu ft for 6” FDR section. The cement content must be 3% by dry weight of FDR with cement with a dry unit weight of 130 lb/cu ft for 9” FDR section. The cement content must be 4% by dry weight of FDR with cement with a dry unit weight of 130 lb/cu ft for 12” FDR section. Cement must be Type II or Type V Portland cement specified in ASTM C 150/150M.
Redlands Regular Meeting of 06-20-2023 1105 of 1523
GC 46
301-8.2 Construction. The asphalt concrete surfacing and underlying base materials shall be pulverized such that 100 percent of the material will pass a two-inch sieve and a minimum of 90 percent will pass a one and one-half inch sieve. All materials other than rock and pulverized asphalt concrete shall be broken up such that these materials will pass a one inch sieve. The pulverized materials shall be free of grass and vegetation, and construction debris to prevent contamination of the pulverized materials. Mixing shall continue until, and at the speed of the recycling unit adjusted to ensure, a homogenous mixture of the above materials and pulverized materials are achieved.
Trimming and disposal of excess material, if required, will be performed on the intimate mixture of pulverized asphalt concrete, base materials and subgrade soil. Excess pulverized material is the surplus that results after trimming and grading the pulverized pavement section to the lines and grades matching existing and/or per plans and specifications. Excess pulverized material shall consist of non-treated well mixed pulverized AC pavement and subgrade.
Do not start pulverized roadbed activities if the ambient air temperature is below 40F. If the ambient air temperature falls below 40F, you may only compact and finish pulverized roadbed.
Before starting daily pulverized roadbed activities, sweep the pulverized roadbed area constructed the previous day to remove loose material.
301-8.3 Surface Preparation. Before pulverized roadbed activities start, prepare the existing roadway surface by:
1. Clearing foreign matter including vegetation
2. Removing standing water
3. Referencing the profile and cross slope
4. Marking the proposed longitudinal cut lines on the existing pavement as follows:
4.1. Cut lines must coincide with points where the existing cross slope changes, approximately at the centerline and edge of traveled way
4.2. Cut lines must indicate the sequence of the cuts
5. Referencing existing lane lines and striping layout
Final pavement surface shall slope away from the street centerline to a maximum of 3% grade.
Pulverized material must be used as base material to meet new cross slope requirements. Native sub-grade material may need to be hauled off to allow for the use of all the pulverized base material. No additional compensation will be allowed for any sub-grade removal and haul-off if required. Any contaminated material will be removed and disposed of by the contractor off site at his expense. Any shortage of material, caused by premature disposal of the indicated surplus material by the contractor, shall be replaced by it and no additional compensation will be allowed for such replacement.
301-8.4 Spreading, Mixing, and Compacting. Do not use a heating device to soften the pavement. Remove any visible oversized materials in the pulverized roadbed mixture before shaping and compacting. If you encounter unstable subgrade or rocks greater than 4 inches in the roadway section, notify the Engineer. The Engineer determines the extent of the unsuitable material and the corrective measures to be taken.
Redlands Regular Meeting of 06-20-2023 1106 of 1523
GC 47
Recycling shall be performed to the depth provided in the plans, while incorporating stabilizing agents, mineral filler, additional aggregate and water. Mixing shall continue until, and the speed of the recycling unit adjusted to ensure, a homogenous mixture of the above materials and pulverized materials is achieved. Pre-cutting, grading and light compacting of the recycled material shall be performed prior to incorporation of the stabilizing. Spread cement uniformly over the full roadway surface width. Do not spread cement more than 30 minutes before mixing. Do not apply dry cement in windy conditions that will result in dust outside the FDR with cement area. The application rate must be the mix design rate or the ordered application rate in lb/sq yd ±
0.5 percent. The application rate of all stabilizing agents shall be continuously monitored. If the measured application rate falls outside the above tolerance, then the recycling operations shall be stopped and corrected before proceeding. Do not spread cement and aggregate before pulverizing.
Water must be injected through the pulverizing machine. The injection rate of mixing water must be sufficient to produce the FDR with cement material mixing moisture content. The water content of the stabilized material shall be monitored closely to ensure proper compaction. Mark where the center of the pulverizing drum stops. Start the following cut on this alignment at least 2 feet behind the mark. Before compacting, remove solids larger than 3 inches in any dimension by hand.
Immediately after pulverizing and mixing, compact FDR with cement to the minimum relative compaction. Do not allow more than 2 hours between final mixing of the pulverized material with cement and completion of initial compaction before trimming. During grading and final compaction add water to maintain the mixing moisture content as described in the mix design. Do not allow more than 2 hours to elapse from the time water is added to the aggregate and cement to completion of final compaction after trimming.
Longitudinal joints between adjacent stabilization passes shall be overlapped at least 4 inches.
Transverse joints between the recycling process shall be saw-cut, if necessary, to provide a vertical clean face to ensure proper compaction. Compaction of cementitious stabilizer begins within 20 minutes after mixing and achieving gradation and moisture requirements.
According to the Section 301-2.3, the compaction shall always be commenced along the edge of the area to be compacted and the roller shall gradually advance toward the center of the area to be compacted. Rollers shall be operated along lines parallel or concentric with the centerline of the road being constructed, and no material variation therefrom will be permitted. All rollers must be maintained in good mechanical and working condition.
The relative compaction of each layer of compacted base material shall not be less than 95 percent.
ASTM D2922, Methods of Density of Soil and Soil Aggregate in Place by Nuclear Methods, (or ASTM D1556). After compaction, the sub-grade shall be firm, and unyielding.
Construction joints shall have vertical faces and shall be made in thoroughly compacted material.
Additional mixture shall not be placed against the construction joint until the joint has been approved by the Engineer. The face of the cut joint shall be lean and free of deleterious material and shall be kept moist until the placing of the adjacent FDR with cement.
Redlands Regular Meeting of 06-20-2023 1107 of 1523
GC 48
301-8.5 Finishing. Once the entire working width (full lane width plus effected shoulder width) has been stabilized, and only after primary compaction has been completed, the entire working width shall be graded to the required profile and cross-slope. Disturbance to the stabilized and primary compacted material shall be kept to a minimum during this grading and shaping operation.
The finished pulverized roadbed surface must not vary more than 0.05 foot from the lower edge of a 12-foot straight edge laid in directions parallel and perpendicular to the centerline. Variations within the above specified tolerances shall be compensating so that the average grade and cross section specified are met. The finished surface must be free from segregation, tearing, and scarring, and have a uniform surface texture throughout the work limits.
Immediately after compaction, apply water and roll with no vibration. The finished surface must be free of ruts, bump, indentations, segregation, raveling, and any loose material.
The completed cement treated subgrade shall be moist cured continuously until it is in a firm and unyielding condition. The cement treated subgrade shall be kept free from heavy traffic during the curing period or until the asphalt concrete surfacing is placed whichever is less, unless otherwise directed by the Engineer. Moisture curing shall be the only method of curing prior to microcracking.
Micro-cracking shall be performed with several vibratory roller passes 48 to 72 hours after finish grading to prevent severe, wide cracks from forming thus reduces the potential for reflective cracking through the HMA layer. Micro-cracking shall be performed before the application of asphaltic emulsion curing seal. After micro-cracking is complete additional moisture curing may be used. Any additional water required to achieve maximum density shall be applied by spraying the surface of the stabilized material with light applications. Care shall be taken so as not to overapply additional water to any areas of the stabilized material.
While open to traffic and before placing HMA, maintain the FDR with cement surface free of ruts, bumps, indentations, raveling, and segregation. If FDR with cement material is damaged, it shall be repaired by removing and replacing the entire depth of affected layers in the damaged area.
Feathering will not be permitted for repair of low areas.
Asphaltic emulsion curing seal must be applied on the completed cement treated base immediately before placing HMA. Asphaltic emulsion curing seal must comply with Caltrans Standard Section 94, Grade SS1 or CSS1. Dilute and thoroughly mix asphaltic emulsion for curing seal at a ratio of 1 part water to 1 part asphaltic emulsion. The water must no cause premature separation of the emulsion. Uniformly apply the diluted curing seal at a rate of 0.1 gal/yd2 of cement treated base surface.
SECTION 302 - ROADWAY SURFACING
302-4 SLURRY SEAL SURFACING.
302-4.3.1 General. – Add the following paragraphs:
Redlands Regular Meeting of 06-20-2023 1108 of 1523
GC 49
All slurry mixing machines shall be equipped with a Fines Feeder for the adding of cement or granular Aluminum Sulfate.
Prior to the beginning of slurry operations, the Contractor shall furnish, at no cost to the City, current licensed weigh master’s certificates indicating the net weight capacity of the aggregate bin.
The Contractor shall provide a drive upon scale at the project site or an alternate site approved by the City. The drive on scale shall show the net weight of the aggregate bin on each slurry machine before the machine and product will be approved for applying slurry on the project.
All slurry machines are to carry, at all times, a calibrated emulsion measuring stick. The emulsion measuring stick is to be calibrated in 10-gallon increments to the slurry machine it is used on.
Emulsion measuring sticks from other slurry machines will not be allowed to measure the gallons of emulsions on the slurry machines they were not calibrated to. The emulsion measuring stick is to have the slurry machine number or identification permanently marked on the stick. The gallons of emulsion are to be measured with a calibrated emulsion measuring stick and recorded before leaving and after returning to materials site. Use of a slurry machine will not be allowed if it does not have a calibrated emulsion measuring stick.
The Contractor shall furnish prior commencing work, a calibrated stick in 10-gallon increments to measure the oil in the trailer storage tanks in gallons. The measuring stick shall be calibrated to the trailer storage tank it is used on. The inspector shall check the oil in each load “in and out” and in the storage tanks at the beginning and end of each day to determine the amount of emulsion used for that day. Emulsion is not to be transferred from delivery tank to on-site storage tank before the City performs the sieve analysis on the emulsion. Aggregate used in the slurry shall not exceed a moisture content of four percent (4%) by weight of dry aggregate.
Contractor may not schedule more than 150 tons of slurry to be placed per day. Slurry may not be applied at more than 150 feet per minute.
The Contractor shall provide a self-propelled 10 ton pneumatic roller with a tire pressure of 50 PSI and equipped with a water spray system. The Contractor shall roll the required streets the same day they are slurried. The Contractor will be responsible for proper scheduling of the work such that the rolling can be properly done within the given time constraint. Failure to comply shall result in a $250.00/calendar day liquidated damage being assessed per incident. The cost of furnishing the roller and operator shall be included in the price paid for slurry seal.
The Contractor is hereby advised that City streets, parking lots, or other City-approved property will not be allowed as a site for stockpiling and batching. Arrangements for an acceptable site shall be the sole responsibility of the Contractor.
The Contractor shall sweep any raveled material on the street one (1) week after the initial placement. If the Engineer determines the raveling is excessive, the frequency of sweeping shall be adjusted to the field conditions of the raveling. If raveling continues within two (2) weeks of the initial placement, the street shall be swept and reslurried with a Type I mixtures (Local Streets) or a Type II (Arterial/Collector Streets) at no cost to the City. Raveling can be identified by the presence of “black pebbles” in the gutter.
Redlands Regular Meeting of 06-20-2023 1109 of 1523
GC 50
The Contractor shall remove any and all weeds that are growing through cracks from the project street located within the pavement or growing between the concrete gutter and the pavement and spray a herbicide mixture of either Hyvar mixed with Roundup or Pramatol mixed with Roundup, or approved equal, at least fourteen (14) calendar days prior to slurrying. The herbicide mixture shall contain Blazon, or approved equal, a purple dye to easily confirm the herbicide has been applied. The work shall be approved by the Engineer or his representative prior to slurrying. Full compensation for plant removal and herbicide treatment shall be considered as included in the unit cost for slurry seal.
Longitudinal joints must correspond with lane lines. You may request other longitudinal joint patterns if they do not adversely affect the slurry seal. Spread slurry seal in full lane widths. Do not overlap slurry seal between adjacent lanes more than 3 inches. Use a material, such as building paper at transverse joints and over previously placed slurry seal to prevent double placement.
Remove the material after use. Use hand tools to remove spillage.
Full compensation for developing a water supply, for furnishing and placing all water required for work done in the Contract, including extra work shall be included in the prices paid for the various items of work requiring water; and no separate payment will be made therefore. The Contractor shall supply the City with licensed weighmaster’s certificates of weight for all delivered aggregates to the job during the course of each day. Aggregate shall be delivered to the project only in the presence of a City representative. The Contractor shall also present weighmaster certificates for the amount of such aggregate remaining at the completion of the project at no cost to the City.
Payment shall be determined by the amount that is physically placed, which cannot exceed the amount that is delivered to the job site with the certified weighmaster tickets. There shall be not outside work done utilizing materials from the tanks or stockpiles stored for the City’s Contract.
Prior to storing aggregate on private property, the Contractor shall submit to the Engineer written permission from the property owner for such stockpiling.
Precautions shall be taken to ensure that stockpiles do not become contaminated with oversized rock, clay, silt, or excessive amounts of moisture. The stockpiles shall be kept in areas that drain readily. Segregation of the aggregate will not be permitted.
The Contactor shall protect the wet slurry from traffic at all times and if damaged or defaced, the Contractor shall repair said damage at no additional cost to the City.
The placement of slurry seal may be suspended with the concurrence of the Engineer due to unsuitable weather, temperature conditions, or other conditions that are considered unfavorable for the prosecution of the work. The Contractor shall immediately comply with the order of suspension by the Engineer, and work shall not be resumed until authorized by the Engineer. 302-4.8 Spreading and Application. - Add the following paragraphs:
Prior to applying slurry seal, the Contractor shall clean, to the satisfaction of the Engineer, the street surface with a power sweeper, remove all R.P.M.’s, abrasive grind or sandblast completely all lane lines, street legends, crosswalks or other painted or thermoplastic surfaces. This is Redlands Regular Meeting of 06-20-2023 1110 of 1523
GC 51
necessary to provide a good bonding surface for the slurry seal, as well as eliminate “ghosting” of the old striping and markings as the new slurry wears off over time.
It is anticipated that nuisance water, such as storm water runoff and irrigation water, will run in and across the right-of-way at various time throughout the period of construction. It shall be the responsibility of the Contractor, at their own expense, to provide for and protect the work from such water. In addition, the Contactor’s responsibility shall include handling nuisance waters such that their operations do not cause them to damage existing improvements or properties adjacent to or near the site of work.
Slurry shall not be applied when the atmospheric temperature is less than 65oF (18oC).
The application of slurry shall not commence until after 8:00 a.m., and shall conclude at 1:30 p.m. unless other authorized by the Engineer. The slurry shall be sufficiently cured to be open to traffic by 4:00 p.m. The portions of streets to be slurried shall be closed from the time the application begins until the mixture as achieved sufficient set to be opened to traffic.
The slurry shall be applied in such a manner that no ripples or waves exist. If ripples or waves occur in the slurry during the application, the work shall cease and the Contractor shall correct the situation. The Contractor may use a drag to knock down ridges. If ripples or waves are not corrected to the Engineer’s satisfaction, the street shall be reslurried at the Contractor’s expense.
The Contractor shall, at the direction of the Engineer, repair the reseal to the entire street, or complete section thereof, as determined by the Engineer, which have not been sealed properly (includes areas that have failed to meet yield and mix design specifications) and completely. No compensation will be provided for slurry seal used in repair and reseal work.
Each slurry crew shall be composed, at a minimum, of a coordinator at the project site at all times, a competent quick-set mixing man, a competent driver, two squeegee men, and sufficient laborers for any handiwork and cleanup.
Surface oil and grease shall be removed or sealed with shellac or an equivalent material approved by the City before the application of the slurry seal. Full compensation for surface oil and grease removal shall be considered as included in the unit cost for slurry seal.
The Contractor shall roll all cul-de-sacs (the last 250’ minimum), the last 250’ of dead-end streets and knuckle curves. Full compensation for rolling the slurry shall be considered as include in the unit cost for slurry seal.
During slurry seal operations, it shall be the Contractor’s responsibility to place protective covering over, or to otherwise avoid slurry seal coating of manholes, utility covers, pavement markers (reflective and non-reflective), concrete gutters, concrete cross gutters, and drainage facilities, survey monuments and remove said covering and/for slurry seal coating after slurry sealing has been completed.
Redlands Regular Meeting of 06-20-2023 1111 of 1523
GC 52
The start and finish of slurry application shall be a straight line which, unless otherwise approved by the Engineer, shall be obtained by laying a strip of building paper or other material approved by the Engineer on the pavement surface. After application of slurry, the paper is to be removed leaving a straight edge. The entire street surface area shall be sealed the same day. 302-4.8.1 Crack Sealing and Filling. Crack sealing shall be performed prior to the Slurry Seal application. Pavement cracks 1/4" wide and larger shall be sealed. Pavement cracks 1/8" to 1" wide shall be cleared of all loose particles of dust, dirt and laitance with oil-free compressed air immediately preceding the sealing operation. Cracks shall be routed out as necessary to provide a reservoir for the sealer that will have a depth of l" to 1 1/2".
The crack sealing material shall be a hot-applied asphalt (Crafco Polyflex or approved equivalent).
The crack sealing material must not be modified or diluted in any way. Pavement cracks larger than 1” wide shall be filled with the mixtures per Specification Section 203-6.4 Type E (Extra Fine).
A wand and nozzle type application shall be used to fill all cracks with crack sealing material.
Crack sealing material shall be applied in two applications with the possibility of additional applications to fill the crack within the allowable tolerance. The cracks must be filled to the surface and not overfilled or applied to the top of adjoining pavement or concrete surfaces. The cracks shall be squeegee immediately after the sealant has been applied to insure conformity with the pavement surface.
The crack sealing material shall then be allowed to penetrate and sink into the crack area for a minimum of one hour. Each crack must then have a second application of crack sealer material applied in the crack area only to within + 0.01' of the adjoining pavement surface. If the material is a cold-applied, polymer modified petroleum emulsion, sand will be applied over the crack sealing material after the second application, covering a minimum of 1 1/2 inches each side of the crack and not more than 3/4 inch higher than the top of the pavement. The contractor shall be responsible for the removal of all excess sand which shall be removed within three hours after being applied.
302-5 ASPHALT CONCRETE PAVEMENT.
302-5.1 General. - Add the following paragraphs:
Asphalt concrete pavement structural sections equal to or greater than 3 inches (76 mm) in thickness shall be installed in two lifts. Base course aggregate material size shall be ¾ inch (19 mm) and cap course aggregate material size shall be ½ inch (13 mm). All pavement shall be placed over 4 inches of crushed aggregate base, unless compacted to 95% relative compaction.
All valves within project limits in the public right-of-way shall be raised to finish grade as a part of this work. The Contractor shall furnish and install new can or slip can materials as necessary.
If new water valve lids are necessary, they shall be supplied by the Municipal Utilities and Engineering Department. All valve can lids within the project limits in the public right-of-way shall be painted the appropriate color for the utility they represent (ie. Water - Blue, Gas - Yellow, Fire – Red, etc.).
Redlands Regular Meeting of 06-20-2023 1112 of 1523
GC 53
302-5.2 Timeline of Paving Operations.
All paving operations shall follow the timeline and requirements shown below unless otherwise approved by the City:
PAVING TIMELINE
DESCRIPTION OF WORK
TIME PERIOD
WEEK 1
(DAY 1-7)
WEEK 2
(DAY 8-14)
WEEK 3
(DAY 15-21)
WEEK 4
(DAY 22-28)
PAVING (START TO FINISH) (1)
CURE PERIOD (2)
MANHOLE ADJUST TO GRADE (3)
STRIPING & PAVEMENT MARKINGS (4)
TRAFFIC LOOPS (5)
NO PARKING SIGNS ALLOWED (6)
Note: All time periods shown above are the maximum amount of allowable time for each activity.
This timeline does not apply to the installation or repair of curb and gutter, ac dikes, sidewalks, cross gutters, curb ramps, driveway approaches or truncated domes. (1) In no case shall any street segment remain unpaved longer than three calendar days if no other work activity is being performed on that street segment. Any deviation from the timeline shall result in a penalty assessment of $1,000 per calendar day. (2) No work except cat tracking of proposed striping is allowed during this period; therefore “No Parking Signs” shall not be installed during this activity. (3) Once each manhole is exposed, all associated work to adjust it to grade must be completed within 48 hours. This shall include all adjustments of manholes, vaults, valve cans, etc. as required by the Contract.
(4) All cat tracking and approval of proposed striping shall occur during the cure period. (5) Traffic loops must be installed after the approval of striping layout and prior to the installation of thermoplastic striping and pavement markings. (6) “No Parking Signs” shall be installed per Section 7-19 of these specifications. 302-5.4 Tack Coat. – Delete and replace with the following:
If the asphalt concrete pavement is being constructed directly upon an existing hard-surfaced pavement, a tack coat of High Performance Seal (HPS) No-Track Tack at an approximate rate of
0.05 gallon per square yard shall be uniformly applied upon the existing pavement preceding the Redlands Regular Meeting of 06-20-2023 1113 of 1523
GC 54
placement of asphalt concrete. The surface shall be free of water, foreign material, or dust when the tack coat is applied. To minimize public inconvenience, no greater area shall be treated in any one day than is planned to be covered by asphalt concrete during the same day, unless otherwise approved by the Engineer.
302-5.5 Distribution and Spreading. – Add the following:
Unless otherwise permitted by the Engineer, the top layer of asphalt concrete for shoulders, tapers, transitions, road connections, private drives, curve widening, turnouts, left-turn pockets, and other such areas, shall not be spread before the top layer of asphalt concrete for the adjoining through lane has been spread and compacted. At locations where the number of lanes are changed, the top layer for the through lanes shall be paved first. Tracks or wheels of spreading equipment shall not be operated on the top layer of asphalt concrete in any area until final compaction has been completed or unless directed by the Engineer.
All screed extensions for paving machines shall be provided with a tamper, roller, or other suitable compacting devices.
Asphalt pavers shall be equipped with automatic screed controls and a sensing device or devices.
Automatic grade and slope control shall be used for overlays.
All joints shall be sealed after rolling.
When placing asphalt concrete to the lines and grades noted in the plans or as approved by the Engineer, the automatic screed controls shall control the longitudinal grade and transverse slope of the screed. Grade and slope references shall be furnished, installed, and maintained by the Contractor. The Contractor shall use a ski device, the minimum length of the ski device shall be 30 ft. The ski device shall be a rigid one-piece unit and the entire length shall be utilized in activating the sensor. The Contractor may use a laser to control the screed.
When placing the initial mat of asphalt concrete on existing pavement, the end of the screed nearest the center line shall be controlled by a sensor activated by a ski device not less than 30 ft long.
The end of the screed farthest from center line shall be controlled by an automatic transverse slope device set to reproduce the cross slope approved by the Engineer.
When paving contiguously with previously placed mats, the end of the screed adjacent to the previously placed mat shall be controlled by a sensor that responds to the grade of the previously placed mat and will reproduce the grade in the new mat within a 0.01 ft. tolerance. The end of the screed farthest from the previously placed mat shall be controlled in the same manner as when placing the initial mat.
Should the automatic screed controls fail to operate properly during any day's work, the Contractor may use manual control of the spreading equipment for the remainder of that day; however, the equipment shall be corrected or replaced with alternative automatically controlled equipment conforming to the requirements in this section before starting the next day's work.
Redlands Regular Meeting of 06-20-2023 1114 of 1523
GC 55
Should the methods and equipment furnished by the Contractor fail to produce a layer of asphalt concrete conforming to the requirements, including straightedge tolerance, of Subsection 302-
5.6.2 - Density and Smoothness, of the Standard Specifications, the paving operation shall be discontinued and the Contractor shall modify his equipment or furnish substitute equipment. A drop-off of more than 0.15 ft will not be allowed at anytime between adjacent lanes open to public traffic.
The Contractor shall schedule his paving operations such that each layer of asphalt concrete is placed on all contiguous lanes of a traveled way each work shift. At the end of each work shift, the distance between the ends of the layers of asphalt concrete on adjacent lanes shall not be greater than 10 ft. nor less than 5 ft. Additional asphalt concrete shall be placed along the transverse edge at the end of each lane and along the exposed longitudinal edges between adjacent lanes, hand raked, and compacted to form temporary conforms. Kraft paper, or other approved bond breaker, may be placed under the conform tapers to facilitate the removal of the taper when paving operations resume.
302-5.6.1 General. - Add the following paragraph:
All asphalt concrete pavement abutting portland cement concrete gutters shall match and be flush with the gutter lip when finish rolling is complete.
302-5.6.2 – Density and Smoothness. – Delete and replace with the following:
The completed surfacing shall be thoroughly compacted, smooth and free from ruts, humps, depressions or irregularities. Any ridges, indentations or other objectionable marks left in the surface of the asphalt concrete shall be eliminated by rolling or other means. The use of any equipment that leaves humps, ridges, irregularities or other objectionable marks in the asphalt concrete shall be discontinued, and acceptable equipment shall be furnished by the Contractor.
The finished surface shall meet the following smoothness criteria:
• When a 12 foot long straightedge is laid on the finished surface parallel to the centerline of the roadway, the finished surface shall not vary from the edge of the straightedge more than 0.05 feet, except at changes in grade,
• When a 12 foot long straightedge is laid on the finished surface perpendicular to the centerline of the roadway and extends from edge to edge of a traffic lane, the finished surface shall not vary from the edge of the straightedge more than 0.05 feet, except at changes in grade.
If the top layer of pavement does not comply with the smoothness specifications shown, remove and replace the entire section or complete a grind and overlay of 1.5 inches or 3 times the aggregate size, whichever is greater. Grind and overlay will be considered as a repair method only when the thickness of the asphalt pavement section is greater than 1.5 inches following the required grinding. Corrected section shall be rectangular to the nearest pavement edge or lane line and to a crosswalk, concrete spandrel or other limits approved by the City. Do not begin corrective actions until the method and limit of correction is authorized by the City. If the tolerances cannot be achieved by the methods described above, the contractor must re-pave the street section, in kind, at their own expenses.
Redlands Regular Meeting of 06-20-2023 1115 of 1523
GC 56
The compaction after rolling shall be a minimum of 91 percent and a maximum of 97 percent of the density obtained on samples compacted with the California Kneading Compactor per California Test 304. Cores will be taken randomly by the City for laboratory testing per California Test 308, Method A at a frequency of three per lot. A lot shall consist of a maximum of 3,000 square yards of asphalt concrete and will be identified in the field by the City. The cores will be averaged to determine the percent of maximum theoretical density, as determined by ASTM D2041, per lot to the nearest tenth of a percent.
Reduced payment factors for percent of maximum theoretical density will be per the following table, and will be applied to the entire lot sampled.
Reduced Payment Factors for Percent of Maximum Theoretical Density Asphalt Concrete
percent of maximum
theoretical density
Reduced payment
factor
Asphalt Concrete
percent of maximum
theoretical density
Reduced payment
factor
91.0 0.0000 97.0 0.0000
90.9 0.0125 97.1 0.0125
90.8 0.0250 97.2 0.0250
90.7 0.0375 97.3 0.0375
90.6 0.0500 97.4 0.0500
90.5 0.0625 97.5 0.0625
90.4 0.0750 97.6 0.0750
90.3 0.0875 97.7 0.0875
90.2 0.1000 97.8 0.1000
90.1 0.1125 97.9 0.1125
90.0 0.1250 98.0 0.1250
89.9 0.1375 98.1 0.1375
89.8 0.1500 98.2 0.1500
89.7 0.1625 98.3 0.1625
89.6 0.1750 98.4 0.1750
89.5 0.1875 98.5 0.1875
89.4 0.2000 98.6 0.2000
89.3 0.2125 98.7 0.2125
89.2 0.2250 98.8 0.2250
89.1 0.2375 98.9 0.2375
89.0 0.2500 99.0 0.2500
< 89.0 Remove and replace > 99.0 Remove and replace
In addition to the reduced payment factors below, all costs associated with the testing of the lot which resulted in values outside of the 91-97 percent range, will be withheld from the final payment due to the Contractor.
Following completion of the testing by the City, the core locations within the asphalt pavement shall be repaired by the Contractor.
Redlands Regular Meeting of 06-20-2023 1116 of 1523
GC 57
302-5.6.3 Tracking. All areas receiving asphalt pavement shall be protected from tracking onto adjacent areas. Do not allow traffic on new asphalt pavement until its mid-depth temperature is below 140º Fahrenheit to minimize the tracking.
A rock dust blotter coat per Section 302-9.7 or a sand coat at a rate of 1-2 pounds per square yard shall be applied to the compacted surface for all areas where tracking is a concern. The application of tracking prevention measures shall be determined by the Contractor.
A haul route for all paving operations shall be reviewed and approved by the City prior to the start of any construction activity. No deviations from the approved haul route shall occur unless approved in writing from the City.
All tracking onto adjacent streets, striping or pavement markings shall be the responsibility of the Contractor. All striping and pavement markings shall be removed and replaced in kind by sandblasting. All tracking onto roadway surfaces may require the use of a street sweeper to the satisfaction of the City.
302-5.7 Joints. – Add the following:
Longitudinal joints shall be trimmed to a vertical face and to a neat line if the edges of the previously laid surfacing are, in the opinion of the Engineer, in such condition that the quality of the completed joint will be affected. Longitudinal and transverse joints shall be tested with a 12’ straightedge and shall be cut back as required to conform to the provisions in Subsection 302-5.6.2 Density and Smoothness for surface smoothness. Connections to existing surfacing shall be feathered to conform to the provisions for smoothness.
Longitudinal joints in the top layer shall correspond with the edges of proposed lane striping.
Longitudinal joints in all other layers shall be offset not less than 0.5' alternately each side of the edges of traffic lanes.
All feathered joints shall be sealed after rolling.
302-5.9 Measurement and Payment. – Add the following:
Reduced payment factors per 302-5.6.2 will be applied to the Contract Unit Price for lots with a Maximum Theoretical Density less than 91.0 and greater than 97.0 percent. 302-5.10 Hot Asphalt Leveling Course. Areas to receive the Hot Asphalt Concrete Leveling Course shall be determined and defined by the project manager and inspector, and identified to the Contractor in the field. Mix for hot Asphalt Concrete Leveling Course shall be 1/2 inch aggregate, C2, as defined in Section 203-6.4.3.
Areas to receive hot asphalt concrete leveling course shall be areas located near or adjacent to existing curbs and/or gutters that are potholed, or have the lip of gutter higher than the adjacent roadway. Potholes, large cracks, or ruts shall be filled to the surrounding grade elevation and compacted. Hot Asphalt Concrete Leveling Course shall be completed prior to the placement of Type II Slurry Seal, ARAM or resurfacing.
Redlands Regular Meeting of 06-20-2023 1117 of 1523
GC 58
Prior to placement of asphalt concrete, the surface shall be cleaned and all debris and deleterious materials shall be removed. A tack coat meeting the material and application requirements of Section 302-5.4 Tack Coat, shall be applied prior to placement of hot mix asphalt concrete. 302-5.11 Asphalt Pavement Crack Sealing and Filling. Crack sealing shall only be performed as a repair method for conventional hot mix asphalt pavement (HMA) and not installed at project locations which will have asphalt rubber hot mix (ARHM) used as the overlay material. Crack sealing shall be performed after milling of existing asphalt surface and prior to any leveling course, if necessary.
Right after milling of existing asphalt and before crack sealing or filling, Contractor shall remove any and all weeds that are growing through cracks from the project street located within the pavement or growing between the concrete gutter and the pavement and spray a herbicide mixture of either Hyvar mixed with Roundup or Pramatol mixed with Roundup, or approved equal, at least seven (7) calendar days prior to paving. The herbicide mixture shall contain Blazon, or approved equal, a purple dye to easily confirm the herbicide has been applied. The work shall be approved by the Engineer or his representative prior to paving. Full compensation for plant removal and herbicide treatment shall be considered as included in the unit cost for paving.
The crack sealing material shall be a hot-applied asphalt (Crafco Polyflex or approved equivalent).
The crack sealing material must not be modified or diluted in any way. Pavement cracks larger than 1” wide shall be filled with the mixtures per Specification Section 203-6.4 Type E (Extra Fine).
A wand and nozzle type application shall be used to fill all cracks with crack sealing material.
Crack sealing material shall be applied in two applications with the possibility of additional applications to fill the crack within the allowable tolerance. The cracks must be filled to the surface and not overfilled or applied to the top of adjoining pavement or concrete surfaces. The cracks shall be squeegee immediately after the sealant has been applied to insure conformity with the pavement surface.
The crack sealing material shall then be allowed to penetrate and sink into the crack area for a minimum of one hour. Each crack must then have a second application of crack sealer material applied in the crack area only to within + 0.01' of the adjoining pavement surface. If the material is a cold-applied, polymer modified petroleum emulsion, sand will be applied over the crack sealing material after the second application, covering a minimum of 1 1/2 inches each side of the crack and not more than 3/4 inch higher than the top of the pavement. The contractor shall be responsible for the removal of all excess sand which shall be removed within three hours after being applied.
SECTION 303 - CONCRETE AND MASONRY CONSTRUCTION
303-1 CONCRETE STRUCTURES.
303-1.1 General. - Delete the first sentence of paragraph 1 and replace with the following:
“Concrete bridges, culverts, catch basins, retaining walls, abutments, piers, footings, foundations, drainage inlets, head walls, end walls, wing walls, junction structures, transition structures, Redlands Regular Meeting of 06-20-2023 1118 of 1523
GC 59
manholes, and other similar types of portland cement concrete structures shall be constructed to the lines and grades in conformity with the Plans and Specifications. 303-5 CONCRETE CURBS, WALKS, GUTTERS, CROSS GUTTERS, ALLEY INTERSECTIONS, ACCESS RAMPS, AND DRIVEWAYS.
303-5.1.1 General. - Replace the last paragraph with the following:
No PCC shall be ordered and/or placed until the forms and subgrade have been inspected and approved by the Engineer in the field.
All pull boxes, water meter boxes, and water valve covers shall be adjusted to proposed finish grade and approved by the Engineer in the field prior to placement of the PCC.
The Contractor shall barricade and protect placed PCC from all damage, marks, mars, and/or graffiti. Any PCC damaged, defaced, discolored, or defective shall be replaced at the Contractor's expense.
When removals of curb and/or sidewalk are located at curb return, the Contractor shall install access ramps. The Contractor is to construct all access ramps in accordance with American Disability Act (ADA) Standards/California Code of Regulations Title 24 – Accessibility Regulations. If the ramps constructed by the Contractor are found to be in non-compliance with ADA Standards, the Contractor will be required to remove and replace the ramps to ADA Standards at the Contractor's expense.
303-5.1.2 Drainage Outlets Through Curb. - Add the following paragraph:
Coring shall be required for all drains through existing curbs. 303-5.1.3 Driveway Entrances. – Replace the last paragraph with the following:
Driveway approaches where required, shall be 150 mm (6") thick for single-family residential area, and 200 mm (8") thick for commercial driveway approaches. 303-5.1.4 Walk. The back of sidewalk shall be 2 inches from the street Right-of-Way line unless otherwise specified by the Engineer.
Included in the price of sidewalk construction are retaining curbs. Retaining curbs are needed to retain soils from sloughing and eroding onto the finished sidewalk surface, as a result of grade differentials from existing ground surface to proposed sidewalk surface. Retaining curbs shall be installed when the finished surface is lower than the surrounding grade by 3 inches vertically within 6 inches horizontally. If the vertical difference in elevation is less than 3 inches, the surrounding grade shall be sloped, maximum 2:1 slope, to match the finished elevation. The height of the retaining curb shall be to the height of the existing grade it is retaining. Retaining curbs shall be located within the City’s right-of-way at all times. 303-5.1.5 Access Ramps. Construction of curb ramps shall conform to the Type and Case appropriate for the condition, as specified on the plans and as shown within the 2012 Standard Plans for Public Works Construction, Plan 111-5. The Contractor shall be responsible to layout the proposed access ramp to comply with the maximum slope indicated on the plans or Standard Plan 111-5. The maximum slope for the ramp shall not be exceeded unless otherwise approved in Redlands Regular Meeting of 06-20-2023 1119 of 1523
GC 60
writing by the Engineer. The Contractor shall remove and replace access ramps deemed noncompliant with the plans or Standard Plan 111-5.
For proposed locations adjacent to a cross gutter spandrel, sawcuts along the radius of the curb will not be allowed. The spandrel shall be replaced from expansion joint to expansion joint to the extents of the curb removal. For proposed locations adjacent to curb and gutter, sawcuts along the flowline of the curb will not be allowed. The entire curb and gutter shall be replaced from expansion joint to expansion joint as required. Sawcuts at locations other than the expansion joint will not be allowed unless approved by the Engineer. Curb cuts of the existing curb will not be permitted for installation of proposed ramp. Any deviation from these requirements will result in rejection of all work at this location and shall not be included in progress payment requests until corrected, per direction from the Engineer.
The Contractor shall verify the extents of sawcut and removal for each access ramp taking into account the maximum slope and transition area required. It shall be the Contractor’s responsibility to identify required removal limits, set concrete forms and verify maximum slopes are not exceeded. The Engineer shall be present to verify the concrete forms prior to the placement of the concrete at each location, however this does not alleviate the responsibility of the accuracy of forms or slopes of the access ramp from the Contractor.
Included in the price of access ramps are retaining curbs. Retaining curbs are needed to retain soils from sloughing and eroding onto the finished ramp surface, as a result of grade differentials from existing ground surface to proposed ramp surface. Retaining curbs shall be installed when the finished surface is lower than the surrounding grade by 3 inches vertically within 6 inches horizontally. If the vertical difference in elevation is less than 3 inches, the surrounding grade shall be sloped, maximum 2:1 slope, to match the finished elevation. The height of the retaining curb shall be to the height of the existing grade it is retaining. Retaining curbs shall be located within the City’s right-of-way at all times.
Access Ramps shall have truncated domes installed in accordance with standard plans and specifications. Truncated domes on new access ramps shall be Armor-Tile, Cast in Place System, or approved equal. Truncated domes installed on existing surfaces shall be Safety Sted TD, or approved equal. Truncated dome panels shall be 36”x48”, inline configuration, with a spacing of
2.35” on center, and Federal Yellow in color.
The access ramp work shall include all related adjustments of pull boxes, pull box covers, signs, and protection of any underground utilities within the work area. The removal and replacement of up to 5 linear feet of sidewalk on each side of the access ramp shall be included within the cost of the access ramp. The removal and replacement of the sidewalk will allow for transition from the top of ramp to adjacent sidewalk and will be utilized as necessary. 303-5.4.3 Weakened Plane Joints, (a) General. - Add the following paragraph:
All weakened plane joints shall be spaced at a maximum of 3.05 m (10') feet for curbs, gutters, and sidewalks. Scoring lines shall conform to those prevailing in the area and be uniform in spacing.
303-5.5.2 Curb. - Replace the first paragraph with the following:
Redlands Regular Meeting of 06-20-2023 1120 of 1523
GC 61
PCC for curb and gutter shall be placed within three working days from removal of the existing PCC curb and gutter. The curb and gutter surface shall not vary more than 3 mm (0.01') from a 3 m (10') straightedge except at the grade changes. Prior to the removal of the forms, the surface shall be finished true to grade by means of a straightedge float of not less than 3 m (10') in length, and operated longitudinally over the surface of the concrete. Form clamps shall be constructed so as not to interfere with the operation of the float. The form on the front of the curbs shall not be removed less than one (1) hour, nor more than six (6) hours after the concrete has been placed. In no event shall forms be removed while the concrete is sufficiently plastic to slump. The top and face of the finished curb shall be true and straight, and top surface of curbs shall be of uniform width, free from humps, sags, blemishes, or other irregularities. 303-5.5.3 Walk. - Add the following paragraphs:
The sidewalk surface shall not vary more than 5 mm (0.02') from the 3m (10') straightedge except at grade changes, and the finished surface shall be free from humps, sags, blemishes or other irregularities. All sidewalks shall be a minimum of 100 mm (4") thick, except at driveways where the sidewalks shall be a minimum of 150 mm (6") thick for single family residential areas and 200 mm (8") thick for all other areas.
303-5.6 Curing. - Add the following paragraph:
Curing compound shall be translucent with red fugitive dye, Type 1, in accordance with Section 201-4 Concrete Curing Compound, of the Standard Specifications. 303-5.7 Repairs and Replacements. - Add the following paragraphs:
In order to minimize vandalism damage to the finished PCC surfaces, the Contractor shall plan his work so that no PCC is poured after 1:00 p.m., unless otherwise authorized by the Engineer in the field.
The Contractor shall barricade and protect placed Portland Cement Concrete from all damages, marks, mars, and/or graffiti. Any Portland Cement Concrete damaged, defaced, discolored, or defective shall be replaced to the satisfaction of the Engineer at the Contractor's expense, and no additional time will be allowed.
Grading, patching, or other remedies to correct the situation will not be accepted unless in the opinion of the Engineer the vandalized area is so small that it does not warrant replacement.
Concrete replacement areas shall be from score mark or control joint to score mark or control joint, and full width of the sidewalk. All replacement areas shall be saw cut. 303-5.8 Backfilling and Cleanup. - Add the following paragraph:
A minimum of 300mm (12”) wide full depth asphalt concrete pavement repair patch and an 450mm (18”) wide 1-1/2” deep grind outside of the trench width is required when cross gutter, spandrel, driveways, curb and gutter is placed adjacent to existing asphalt concrete pavement. The asphalt concrete pavement repair patch shall be placed within two (2) working days after the cross gutters, spandrels, driveways, curb and gutter are replaced. The asphalt concrete pavement shall be sawcut. All work shall be in accordance with the General Permit Conditions and Trench Specifications, latest edition.
Redlands Regular Meeting of 06-20-2023 1121 of 1523
GC 62
SECTION 304 - METAL FABRICATION AND CONSTRUCTION
304-3 CHAIN LINK FENCE.
304-3.4 Measurement and Payment. - Delete paragraph 1 and replace with:
Chain link fence will be measured along the horizontal projection line of the completed fence, deducting the widths of gates and openings.
SECTION 314 - TRAFFIC STRIPING, CURB AND PAVEMENT
MARKINGS, AND PAVEMENT MARKERS
314-1 GENERAL. - Add the following paragraphs:
To insure the protection of storm drain inlets, Best Management Practices (BMPs) shall be employed during all striping operations. Refer to Section 7-8.6.
Each storm drain catch basin or storm drain inlet box shall be marked “NO DUMPING - FLOWS TO CREEK.” Two coats of paint are required. Stencil shall match City’s stencil. Paint and painting shall comply with the specifications.
All street resurfacing work shall include installing fire hydrant pavement markers at all fire hydrant location, whether the pavement markers were existing or not. The pavement markers shall be Type I – Two-Way Blue Retroreflective per Section 214-6 of the Specifications and installed per City’s detail drawing No. 102-0. All work associated with the installation of all new, or replacement of existing, fire hydrant pavement markers shall be included as noted within the specifications. 314-4 APPLICATION OF TRAFFIC STRIPING AND CURB AND PAVEMENT MARKINGS.
314-4.1 General. – Add the following paragraphs:
During construction, if traffic legends or lane striping are removed or paved-over for any reason, they shall be replaced immediately with temporary traffic legends or lane striping as directed by the City, and the Contractor shall place permanent traffic legends or lane striping at the end of the job or on completion of final paving. When permanent items are placed, they shall be complete markings, legends, or striping i.e.: if limit lines are disturbed, they shall be replaced to centerline or from curb to curb, whichever was existing; if a letter in a word is removed or covered, the entire word shall be replaced; and lane striping shall extend 75 feet beyond construction limits. All replacement markings, legends, or striping required to be replaced beyond the contract limits shown shall be at the cost of the Contractor and shall meet City standards. If existing striping or legends are to be removed on existing surfaces, they shall be sandblasted. Painting over striping or legends in lieu of removal will not be permitted. Pavement striping shall comply with the applicable provisions of Sections 214 and 314 of the Standard Specifications.
Where side streets with existing striping, markings and markers are encountered, striping, markings and markers shall be repainted and replaced for a minimum distance of 15 m (50 feet) from the crosswalk, stop bar or limit line.
Redlands Regular Meeting of 06-20-2023 1122 of 1523
GC 63
314-4.2 Control of Alignment and Layout.
314-4.2.1 General. - Delete and replace with the following:
The Contractor will be responsible for all layout of all striping. All striping, markings and markers shall be reinstalled in their existing locations unless otherwise shown on the plans. The Contractor shall be responsible to take appropriate measures and record the existing locations.
The Contractor shall verify all dimensions in the field prior to installation of pavement striping/marking layout (Cat-Track). Should field measurements differ from the plan, the Contractor shall immediately notify City staff. No Cat-Track marks shall be placed until discrepancies are resolved.
Cat-Track must be approved by City staff prior to the installation of permanent pavement striping/marking. Contractor shall notify City staff a minimum of 24 hours prior to installation of permanent pavement striping/marking to allow for inspection and approval. If approval of CatTrack is not obtained by the Contractor, all work required to correct the striping/marking will be at the expense of the Contractor
Cat-Track marks shall be made in chalk. Paint for the purpose of Cat-Track is prohibited. If paint is used, the Contractor must remove the paint without damaging or visually deforming the pavement surface. If damage or visual deformity within the removal area occurs, in the opinion of City staff, the Contractor shall grind and overlay the entire segment with no additional compensation. The area of the grind and overlay shall be as required by City staff and shall be a minimum of 0.10’ thickness.
All visible Cat-Track markings after the installation of the permanent striping/marking shall be removed without damage or visual deformity to the pavement surface. Any damage or visual deformity to the pavement shall be remedied as noted above. 314-4.3.5 Application. - Amend the first sentence in paragraph 8 as follows:
“Glass beads shall be applied at a rate of 0.6 to 0.8 kg of beads per liter (5 to 7 pounds of beads per gallon).”
314-6 GREEN BIKE LANE. Green bike lanes shall be installed per plan and conform to the technical specifications included within the contract documents and shall be Streetbond CL or approved equal.
Redlands Regular Meeting of 06-20-2023 1123 of 1523
THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 06-20-2023 1124 of 1523
GENERAL REQUIREMENTS
Redlands Regular Meeting of 06-20-2023 1125 of 1523
THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 06-20-2023 1126 of 1523
COORDINATION OF WORK, PERMITS, AND REGULATIONS 01110-1
SECTION 01110 COORDINATION OF WORK
PART ONE -- GENERAL
1. COORDINATION OF WORK
The Contractor shall submit the construction schedule in accordance with Section 03121 of these specifications.
The Contractor shall arrange the schedule of work, but it must adhere to the following restrictions:
1. Contractor shall schedule full work days of operation until funds are exhausted.
2. Citywide events calendar shall be considered with the schedule for construction.
3. The events calendar will be provided at the pre-construction meeting. Updated events calendar will be provided during subsequent weekly construction meetings.
4. Construction around school zone shall be taken into consideration to avoid interference with the drop-off and pick-up times for each specific school.
5. Detailed construction activities and construction schedule will be provided during weekly construction meetings.
6. The following areas will have first priority during construction: Alleys between Pioneer Avenue and San Bernardino Avenue; and Ohio Street and Orange Street shown on sheets 13 and 14.
1.2 UTILITY COORDINATION
During construction, if City owned utility facilities are damaged, contractor shall inform the City. City crew will respond within two hours and assess the condition, and perform any necessary remedial work as quickly as possible. No additional compensation will be granted to the contractor for any delay due to the damage and repair of the utility facility.
Other utilities not owned by the City, contractor should notify and coordinate with the utility owner.
END OF SECTION
Redlands Regular Meeting of 06-20-2023 1127 of 1523
THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 06-20-2023 1128 of 1523
TRAFFIC CONTROL PLAN 01111-1
SECTION 01111 TRAFFIC CONTROL PLAN
A. General
The intent of this specification is to provide the format and requirements in preparation of the Traffic Control Plan (TCP).
B. Format
1. The sheets of the TCP shall display, at a minimum, the title of the project, name of firm preparing the TCP, name and stamp of Registered Traffic or Civil Engineer preparing the TCP, approval block for City of Redlands approval, north arrow, title sheet with an index of the sheets, sheet number, and total number of sheets.
2. The TCP shall be drawn to a 1 inch = 40 scale, or as otherwise approved by City staff, on common size sheets ranging from 8-1/2 inches x 11 inches, 11 inches x 17 inches or 24 inches x 36 inches as determined appropriate based on work area.
3. TCP must be prepared and approved by a Registered Traffic or Civil Engineer in the State of California.
C. Requirements
The TCP shall contain the following items and scenarios of traffic control:
1. Non-potable pipeline installation;
2. Potable pipeline installation;
3. Non-potable pipeline connection points;
4. Potable pipeline connection points;
5. Resurfacing operations;
6. Variations to accommodate night work;
7. All required detours;
8. Provide 4 changeable message boards, Solartech MB2-LR-1548 or approved equal, located throughout the project area to provide advance notification as work progresses;
9. The TCP shall be completed in conformance with Section 7-10.2.2.1 of the General Conditions and adhere to the following:
a. At least one lane of traffic shall be open on all roadways during the pipeline installation with appropriate traffic control and flaggers; Redlands Regular Meeting of 06-20-2023 1129 of 1523
TRAFFIC CONTROL PLAN 01111-2
b. Contractor shall install non-potable pipeline first and be fully operational prior to the start of the potable pipeline; c. On street parking, where currently available, shall be open to the public outside of working hours; and
d. Colton Avenue between New York Avenue and Orange Street may be closed to thru traffic during the resurfacing operations; and e. Shall be completed in conformance with all additional requirements from permitting agencies, such as Caltrans and SANBAG.
END OF SECTION
Redlands Regular Meeting of 06-20-2023 1130 of 1523
DESCRIPTION OF WORK 01112-1
SECTION 01112 DESCRIPTION OF WORK
PART ONE -- GENERAL
1.1 SUMMARY
A. The work to be done under this Contract includes the furnishing of project management, labor, materials, tools and equipment for the construction of the 2022 CIP Sewer Pipeline Replacement Project, Project No. 521029 for the City of Redlands, all in accordance with the Contract Documents.
B. The following contract drawings are made a part of these Contract Documents:
Title Sheet No.
Title Sheet & Vicinity Map 1
General Notes, Construction Notes, Symbol Legend and Details 2 Sewer Pipeline Replacement/Rehabilitation Plans 3-14
1.2 GENERAL SCOPE OF WORK
A. Work In This Contract: Work in this Contract includes all labor, materials and equipment necessary for construction of 2022 CIP Sewer Pipeline Replacement Project, Project No. 521029 as noted on the Contract Drawings and all other Contract Documents and is summarized as follows:
1. The Work shall consist of furnishing and installing installing all pipe, fittings, manholes, CIPP, and appurtenances; testing all pipelines; all traffic control (including furnishing and installing all arrowboards, barricades, signs, delineators, and flagmen); all utility location and verification (excavating, exposing, and verifying top, bottom, and side of utility facilities); all pavement removal and disposal; all earthwork (including trenching, shoring, sloping, bedding, and backfilling including select imported material or select native material); compacting; protecting in place or removing and replacing all existing utilities, manholes, trees, and public and private improvements; replacing all asphalt concrete pavement; pavement striping and restriping; testing all pipelines; destroyed survey monuments; disposing of excess soil and rock material and restoring all areas and improvements to pre-construction conditions.
2. The Contractor shall, upon completion of the pipeline construction and appurtenances required herein, initially operate all components of the Contract Work furnished and installed by Contractor, and make any additional adjustments, corrections, repairs, replacements, and reconstructions necessary to provide the City with complete, correctly operating pipeline and appurtenances.
END OF SECTION
Redlands Regular Meeting of 06-20-2023 1131 of 1523
THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 06-20-2023 1132 of 1523
DESCRIPTION OF WORK 01112-1
SECTION 01112 DESCRIPTION OF WORK
PART ONE -- GENERAL
1.1 SUMMARY
A. The work to be done under this Contract includes the furnishing of project management, labor, materials, tools and equipment for the construction of the 2022 CIP Sewer Pipeline Replacement Project, Project No. 521029 for the City of Redlands, all in accordance with the Contract Documents.
B. The following contract drawings are made a part of these Contract Documents:
Title Sheet No.
Title Sheet & Vicinity Map 1
General Notes, Construction Notes, Symbol Legend and Details 2 Sewer Pipeline Replacement/Rehabilitation Plans 3-14
1.2 GENERAL SCOPE OF WORK
A. Work In This Contract: Work in this Contract includes all labor, materials and equipment necessary for construction of 2022 CIP Sewer Pipeline Replacement Project, Project No. 521029 as noted on the Contract Drawings and all other Contract Documents and is summarized as follows:
1. The Work shall consist of furnishing and installing installing all pipe, fittings, manholes, CIPP, and appurtenances; testing all pipelines; all traffic control (including furnishing and installing all arrowboards, barricades, signs, delineators, and flagmen); all utility location and verification (excavating, exposing, and verifying top, bottom, and side of utility facilities); all pavement removal and disposal; all earthwork (including trenching, shoring, sloping, bedding, and backfilling including select imported material or select native material); compacting; protecting in place or removing and replacing all existing utilities, manholes, trees, and public and private improvements; replacing all asphalt concrete pavement; pavement striping and restriping; testing all pipelines; destroyed survey monuments; disposing of excess soil and rock material and restoring all areas and improvements to pre-construction conditions.
2. The Contractor shall, upon completion of the pipeline construction and appurtenances required herein, initially operate all components of the Contract Work furnished and installed by Contractor, and make any additional adjustments, corrections, repairs, replacements, and reconstructions necessary to provide the City with complete, correctly operating pipeline and appurtenances.
END OF SECTION
Redlands Regular Meeting of 06-20-2023 1133 of 1523
THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 06-20-2023 1134 of 1523
MEASUREMENT AND PAYMENT 01200-1
SECTION 01200 MEASUREMENT AND PAYMENT
A. Work Listed in the Schedule of Work Items
1. The application for payment will be for a specific item based on the percentage completed or quantity installed. The percentage complete will be based on the value of the partially completed work relative to the value of the item when entirely completed and ready for service.
2. A retention of five percent (5%) of the value of work completed will be withheld from progress payments. This retention amount will remain constant throughout the contract period, and will not be payable until the expiration of thirty-five (35) days after the recordation of the Notice of Completion.
B. Work Not Listed in the Schedule of Work Items
The General Conditions and items in the General Requirements, and Specifications which are not listed in the schedule of work items of the bid form are, in general, applicable to more than one listed work item, and no separate work item is provided therefore. Include the cost of work not listed but necessary to complete the project designated in the contract documents in the various listed work items of the bid form.
The bids for the work are intended to establish a total cost for the work in its entirety. Should the Contractor feel that the cost for the work has not been established by specific items in the bid form, include the cost for that work in some related bid item so that the proposal for the project reflects the total cost for completing the work in its entirety.
The Contractor may experience difficulty in excavation due to rock or unsuitable backfill material throughout the project locations. It shall be the Contractor’s responsibility to identify these areas and account for difficulty in excavation, the need to export rock or unsuitable backfill material and the need to import suitable backfill material. There will not be additional contract time or additional compensation for any project locations where any of these circumstances occur.
C. Bid Items
1. Mobilization, Bid Item 1:
Payment for Mobilization shall be made at the contract lump sum price and shall constitute full compensation for all labor, material, equipment, and incidentals required within Section 01721. The bid price shall include, but not limited to, preliminary construction schedule, bonds, insurance, installation and relocation of information signs, shop drawings, catalog submittals and shall constitute full compensation for all labor, Redlands Regular Meeting of 06-20-2023 1135 of 1523
MEASUREMENT AND PAYMENT 01200-2
material, equipment and incidentals required. The bid price for mobilization shall not exceed 5 percent of the Bid Schedule total price.
2. Traffic Control Plan, Bid Item 2:
Payment for Traffic Control Plan shall be made at the contract lump sum price and shall constitute full compensation for preparation, approval, and shall include all labor and incidentals noted to complete the Traffic Control Plan per Section 01111.
The installation and implementation of traffic control items shall be included throughout bid items and the specific traffic control required for installing each item.
3. Erosion Control Plan, Bid Item 3:
Payment for Erosion Control Plan shall be made at the contract lump sum price and shall constitute full compensation for preparation, approval, NPDES Permit and shall include all labor and incidentals noted within Section 01572.
Payment for the Erosion Control Plan shall be made based on the percentage of project completion to ensure compliance with all requirements. The completeness shall be determined by the Engineer and updated on progress payments.
4. Survey, Bid Item 4:
Payment for Survey shall be made at the contract lump sum price and shall constitute full compensation for research, construction surveying, construction staking, preparation and submittal of surveying cut sheets, tying existing control monuments that may be damaged or disturbed prior to construction, verifications of horizontal and vertical position of existing control monuments, recovery and reestablishment of damaged or disturbed control monuments after construction, preparation and submittal of corner records to applicable government agencies, and shall include all labor and incidentals noted within Section 01722.
Payment for the Survey shall be made based on the percentage of project completion to ensure compliance with all requirements throughout the duration of the contract. The completeness shall be determined by the Engineer and updated on progress payments.
5. Remove & Replace Existing 8” Pipe with 8” SDR 35 PVC Pipe, Bid Item 5:
Payment for Remove & Replace Existing 8” Pipe with 8” SDR 35 PVC Pipe shall be made at the contract unit price per linear foot and shall constitute full compensation for all labor, material, equipment and incidentals required to furnish and install the pipeline complete in place per the plans and specifications.
The bid price shall include, but not be limited to all necessary potholing, utility research and investigation, trench protection, traffic control, pavement saw cutting and removal, trenching, trench protection for workers removal and disposal of existing sewer pipe, cutting of lateral pipes, handling and disposal of unsuitable and waste material, pipe and appurtenances, pipe bedding and trench backfilling (including imported material, or select native if approved by the Engineer), compacting to a minimum of 95% relative compaction, placing and compacting 4” crushed aggregate base to 95% relative compaction, placing temporary asphalt concrete, replacing prior to final paving any Redlands Regular Meeting of 06-20-2023 1136 of 1523
MEASUREMENT AND PAYMENT 01200-3
damaged concrete gutters from expansion joint to expansion joint, including dowels at each joint, final paving, required testing, CCTV inspection, or re-inspection, if required, of the pipeline, protecting in place or removing and replacing all existing utilities and public and private improvements, work site, and restoring all areas to pre-existing conditions.
Measurement shall be made horizontally along the centerline of the newly completed PVC pipeline, without deducting for pipeline fittings or appurtenances.
6. Remove & Replace Existing 10” Pipe with 10” SDR 35 PVC Pipe, Bid Item 6:
Payment for Remove & Replace Existing 10” Pipe with 10” SDR 35 PVC Pipe shall be made at the contract unit price per linear foot and shall constitute full compensation for all labor, material, equipment and incidentals required to furnish and install the pipeline complete in place per the plans and specifications.
The bid price shall include, but not be limited to all necessary potholing, utility research and investigation, trench protection, traffic control, pavement saw cutting and removal, trenching, trench protection for workers removal and disposal of existing sewer pipe, cutting of lateral pipes, handling and disposal of unsuitable and waste material, pipe and appurtenances, pipe bedding and trench backfilling (including imported material, or select native if approved by the Engineer), compacting to a minimum of 95% relative compaction, placing and compacting 4” crushed aggregate base to 95% relative compaction, placing temporary asphalt concrete, replacing prior to final paving any damaged concrete gutters from expansion joint to expansion joint, including dowels at each joint, final paving, required testing, CCTV inspection, or re-inspection, if required, of the pipeline, protecting in place or removing and replacing all existing utilities and public and private improvements, cleaning work site, and restoring all areas to preexisting conditions.
Measurement shall be made horizontally along the centerline of the newly completed PVC pipeline, without deducting for pipeline fittings or appurtenances.
7. Remove & Replace Existing 12” Pipe with 12” SDR 35 PVC Pipe, Bid Item 7:
Payment for Remove & Replace Existing 12” Pipe with 12” SDR 35 PVC Pipe shall be made at the contract unit price per linear foot and shall constitute full compensation for all labor, material, equipment and incidentals required to furnish and install the pipeline complete in place per the plans and specifications.
The bid price shall include, but not be limited to all necessary potholing, utility research and investigation, trench protection, traffic control, pavement saw cutting and removal, trenching, trench protection for workers removal and disposal of existing sewer pipe, cutting of lateral pipes, handling and disposal of unsuitable and waste material, pipe and appurtenances, pipe bedding and trench backfilling (including imported material, or select native if approved by the Engineer), compacting to a minimum of 95% relative compaction, placing and compacting 4” crushed aggregate base to 95% relative compaction, placing temporary asphalt concrete, replacing prior to final paving any damaged concrete gutters from expansion joint to expansion joint, including dowels at Redlands Regular Meeting of 06-20-2023 1137 of 1523
MEASUREMENT AND PAYMENT 01200-4
each joint, final paving, required testing, CCTV inspection, or re-inspection, if required, of the pipeline, protecting in place or removing and replacing all existing utilities and public and private improvements, cleaning work site, and restoring all areas to preexisting conditions.
Measurement shall be made horizontally along the centerline of the newly completed PVC pipeline, without deducting for pipeline fittings or appurtenances.
8. Reconnect Sewer Lateral, Bid Item 8:
Payment for Reconnect Sewer Lateral shall be made at the contract unit price and shall constitute full compensation for all labor, material, equipment and incidentals required to furnish and install complete in place per Detail 2 on Sheet 2 of the plans and all specifications.
The bid price shall include, but not be limited to all necessary potholing, utility research and investigation, trench protection, traffic control, pavement saw cutting and removal, trenching, trench protection for workers removal and disposal of existing sewer pipe, cutting of lateral pipes, handling and disposal of unsuitable and waste material, pipe and appurtenances, pipe bedding and trench backfilling (including imported material, or select native if approved by the Engineer), compacting to a minimum of 95% relative compaction, placing and compacting 4” crushed aggregate base to 95% relative compaction, placing temporary asphalt concrete, final paving, testing, protecting in place or removing and replacing all existing utilities and public and private improvements, cleaning work site, and restoring all areas to pre-existing conditions.
9. CIPP 8” Pipe, Bid Item 9:
Payment for CIPP 8” Pipe shall be made at the unit price from the proposal and shall constitute full compensation for all labor, material, equipment and incidentals required to furnish and install CIPP 8” Pipe complete in place per the plans and specifications.
The price shall include, but not be limited to, traffic control, disposal of debris, cleaning, pre and post installation video inspection, quality control and all labor, materials, tools, incidentals, and equipment required to complete the work.
10. CIPP 10” Pipe, Bid Item 10:
Payment for CIPP 10” Pipe shall be made at the unit price from the proposal and shall constitute full compensation for all labor, material, equipment and incidentals required to furnish and install CIPP 10” Pipe complete in place per the plans and specifications.
The price shall include, but not be limited to, traffic control, disposal of debris, cleaning, pre and post installation video inspection, quality control and all labor, materials, tools, incidentals, and equipment required to complete the work.
11. CIPP 12” Pipe, Bid Item 11:
Payment for CIPP 12” Pipe shall be made at the unit price from the proposal and shall constitute full compensation for all labor, material, equipment and incidentals required to furnish and install CIPP 12” Pipe complete in place per the plans and specifications.
Redlands Regular Meeting of 06-20-2023 1138 of 1523
MEASUREMENT AND PAYMENT 01200-5
The price shall include, but not be limited to, traffic control, disposal of debris, cleaning, pre and post installation video inspection, quality control and all labor, materials, tools, incidentals, and equipment required to complete the work.
12. Re-establish Lateral Connections following CIPP, Bid Item 12:
Payment for Re-establish Lateral Connection following CIPP shall be made at the unit price from the proposal and shall constitute full compensation for all labor, material, equipment and incidentals required to furnish and install Re-establish Lateral Connection following CIPP complete in place per the plans and specifications.
The price shall include, but not be limited to, traffic control, disposal of debris, cleaning, pre and post installation video inspection, quality control and all labor, materials, tools, incidentals, and equipment required to complete the work.
13. 8”/10” Spot Repair, Bid Item 13:
Payment for 8”/10” Spot Repair shall be made at the contract unit price per linear foot and shall constitute full compensation for all labor, material, equipment and incidentals required to furnish and install the pipeline complete in place per the plans and specifications.
The bid price shall include, but not be limited to all necessary potholing, utility research and investigation, trench protection, traffic control, pavement saw cutting and removal, trenching, trench protection for workers removal and disposal of existing sewer pipe, handling and disposal of unsuitable and waste material, pipe, couplings and appurtenances, pipe bedding and trench backfilling (including imported material, or select native if approved by the Engineer), compacting to a minimum of 95% relative compaction, placing and compacting 4” crushed aggregate base to 95% relative compaction, placing temporary asphalt concrete, replacing prior to final paving any damaged concrete gutters from expansion joint to expansion joint, including dowels at each joint, final paving, required testing, CCTV inspection, or re-inspection, if required, of the pipeline, protecting in place or removing and replacing all existing utilities and public and private improvements, cleaning work site, and restoring all areas to preexisting conditions.
Measurement shall be made horizontally along the centerline of the newly completed PVC pipeline, without deducting for pipeline fittings or appurtenances.
14. Lateral Connection Repair, Bid Item 14:
Payment for Lateral Repair shall be made at the contract unit price and shall constitute full compensation for all labor, material, equipment and incidentals required for joint off-set corrections, cutting hammer taps and protruding laterals and capping if required for the jointing and connecting of service laterals to existing sanitary service.
The bid price shall included, but not be limited to all necessary potholing, utility research and investigation trench protection, traffic control, pavement saw cutting and removal, trenching, trench protection for workers removal and disposal of existing sewer pipe, handling and disposal of unsuitable and waste material, pipe, wye, couplings and Redlands Regular Meeting of 06-20-2023 1139 of 1523
MEASUREMENT AND PAYMENT 01200-6
appurtenances, pipe or wye bedding and trench backfilling (including imported material, or select native if approved by the Engineer), compacting to a minimum of 95% relative compaction, placing and compacting 4” crushed aggregate base to 95% relative compaction, placing temporary asphalt concrete, replacing prior to final paving any damaged concrete gutters from expansion joint to expansion joint, including dowels at each joint, final paving, required testing, CCTV inspection, or re-inspection, if required, of the pipeline, protecting in place or removing and replacing all existing utilities and public and private improvements, cleaning work site, and restoring all areas to preexisting conditions.
15. Flow Bypass, Bid Item 15:
Payment for Flow Bypass shall be made at the lump sum price from the proposal and shall constitute full compensation for all labor, material, equipment and incidentals required to furnish and install the flow bypass system and prepare a bypass plan for review and approval by the City per Section 3-12.5.
Contractor shall also prepare a spill prevention plan for review and approval by the City in accordance with Section 3-12.5 of the specifications. The contractor shall be fully responsible for containing any sewage spillage, preventing any sewage from reaching water courses, recovery, cleaning and legal disposal of any spilled sewage, and fines, or penalties associated with the sewage spill imposed upon the agency and/or the contractor by jurisdictional regulatory agencies, and any other expenses or liabilities replaced to the sewage spill.
All pipeline or manhole work proposed within this contract shall be assumed to require a flow bypass system to complete. Sewage shall not be permitted to flow in trenches nor be covered by backfill. Plugging manholes and pumping via a vactor truck from manhole to manhole will not be considered a sufficient means for bypassing.
16. Testing of CIPP Liner, Bid Item 16:
Payment for testing of CIPP liner shall be made at the unit price from the proposal and shall constitute full compensation for all labor, material, equipment and incidentals required to complete all testing requirements listed within Section 02766 of the specifications.
17. Demobilization, Bid Item 17:
Payment for Demobilization shall be made at the contract lump sum price and shall constitute full compensation for all labor, material, equipment, and incidentals required within Section 01740.
18. Unforeseen work not covered within all other bid items, Bid Item 18:
Payment for unforeseen work not covered within all other bid items shall be made at the contract lump sum price and shall constitute full compensation for all labor, material, equipment, and incidentals required. Unforeseen work must be approved by the City staff before doing any work, and pay estimate shall be negotiated based on unit price already established with the bid proposal for this project. Any work required that is outside of the Redlands Regular Meeting of 06-20-2023 1140 of 1523
MEASUREMENT AND PAYMENT 01200-7
proposed bid unit cost, shall be performed based on time & material (T&M) basis and T&M cost shall be negotiated and approved by the City staff prior to performing the work.
Unforeseen work will be paid in each billing cycle with a percentage of the lump sum cost included in the bid. This item may or may not be spent entirely.
END OF SECTION
Redlands Regular Meeting of 06-20-2023 1141 of 1523
THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 06-20-2023 1142 of 1523
CHANGE ORDER REQUESTS 01251-1
SECTION 01251 CHANGE ORDER REQUESTS
1.1 GENERAL
A. All quotations for preliminary change orders for extras, changes, additions, or deletions to the Work as described in EXTRA WORK of the GENERAL CONDITIONS shall be submitted to the ENGINEER, in writing, on the Change Order Request (COR) Cover Sheet and the Change Order Cost Summary Form, both attached, and in conformance with the requirements of Section 01254 CHANGE ORDERS. The quotation shall be firm for a period of not less than sixty (60) calendar days from the date of receipt of the quotation by the ENGINEER. The CONTRACTOR shall submit its written cost quotation and Time Impact Analysis not later than fifteen (15) days after being requested to provide such quotation, unless the ENGINEER allows more time. Delays in submitting quotations beyond the fifteen (15) days set forth herein, which cause a delay in the issuance of a Change Order or a delay to the completion date of the project, shall not be cause for a claim or a time extension under the Contract.
B. The ENGINEER'S request for quotation on a preliminary change shall not be considered authorization to proceed with the changed work prior to the issuance of a final Lump Sum or Time & Material Change Order, unless directed otherwise, in writing, by the ENGINEER, nor shall such request constitute justification for a delay to the existing Work or a time extension under the Contract.
END OF SECTION
Redlands Regular Meeting of 06-20-2023 1143 of 1523
CHANGE ORDER REQUESTS 01251-2
Redlands Regular Meeting of 06-20-2023 1144 of 1523
CHANGE ORDER REQUESTS 01251-3
Change Order Cost Summary
Project Name :
Change Order Request No. :
Date :
Direct
Labor
Direct
Materials
Direct
Equipment
(1): Lump Sum Work by $0.00 $0.00 $0.00
Prime Contractor
(2): "T&M" Work by $0.00 $0.00 $0.00
Prime Contractor
(3): Subtotal - Direct Work
$0.00 $0.00 $0.00
(Prime Contractor)
(4): All Lump Sum Work by $0.00 $0.00 $0.00
subcontractors (any tier)
(5): All "T&M" Work by $0.00 $0.00 $0.00
subcontractors (any tier) Totals
(6): Subtotal - Direct Work
$0.00 $0.00 $0.00 $0.00
(all subcontractors)
Add each of the
(3)+(6)=(7): Total - Direct Costs
$0.00 $0.00 $0.00
three columns
$0.00
across and enter
to the right.
(8): Markup
(20%
of
direct
labor)
(15% of
direct mat'l)
(15% of
direct equip)
$0.00 $0.00 $0.00 $0.00
(9): Prime Contractor
Markup 10% of line (6) direct sub work up to $5,000
for subcontractors plus 5% of line (6) direct sub work over $5,000
(10): Bonds & Insurance 1% of line (7)
$0.00 all direct work
(11): Additional amount
permitted by Contract
(12): GRAND TOTAL Add sums of lines)
$0.00
(7), (8), (9), (10) and (11)
Redlands Regular Meeting of 06-20-2023 1145 of 1523
THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 06-20-2023 1146 of 1523
CHANGE ORDERS 01254-1
SECTION 01254 CHANGE ORDERS
PART ONE -- GENERAL
1.1 REQUIREMENTS
Payment to the Contractor, or credit to the City, for any change, addition, deletion or extra to the Work, or settlement of any Claim, covered by any Change Order, shall be determined by the methods set forth herein. The Engineer may change the Plans and Specifications, character of the Work, or quantity of Work provided the total arithmetic dollar value of all such changes, both additive and deductive, does not exceed twenty-five percent (25%) of the Contract Price. Should it become necessary to exceed this limitation, the change shall be by written Supplemental Agreement between the Contractor and the City, which shall be executed by a Change Order.
Unless otherwise stipulated, “Unit Prices” include all costs necessary to furnish, install and complete the Work. The “Unit Prices” include all direct costs for labor, equipment and materials, all insurance and bond costs, all field and office supervisors and assistants, all onsite project administration, security costs, the cost of small tools and consumables, incidental job burdens, and all general home office expenses and no separate allowance will be made therefor. Assistants to field and office supervisors include all clerical, stenographic, and general office help. Incidental job burdens include, but is not limited to, office equipment and supplies, temporary toilets, telephone, utilities, safety equipment, warning devices, personal protective equipment, and conformance to OSHA requirements. Project administration includes, but is not limited to, review and coordination, estimating, engineering, scheduling, and expediting relative to Change Orders, and updating and furnishing Record Drawings to incorporate changes, schedule update, supervision not applied solely to the Work of the Change Order, home office salaries and expenses, and City of Redlands Business Tax.
A. Unit Prices
Unit prices stipulated in the Bid or itemized in the approved Schedule of Values shall be utilized, where they are applicable and determined reasonable by the Engineer. In the event that the Change Order results in a change in the original quantity of more than twenty-five percent (25%), either increase or decrease, then either the Engineer or the Contractor may request a review of the unit price to determine if a new unit price shall be mutually determined by negotiation. Any new unit price mutually determined under this Subsection shall only apply to the units in excess of one hundred twenty five percent (125%) of the original quantity for overruns. In case of underruns, the unit price stipulated in the Bid shall be applied to the first twenty-five percent (25%) of the actual quantity of work performed and the new mutually determined price shall be applied to the quantity between twenty-five percent (25%) and seventy-five percent (75%) of the original quantity.
Redlands Regular Meeting of 06-20-2023 1147 of 1523
CHANGE ORDERS 01254-2
Renegotiated unit prices or unit prices for new items added to the Contract by Change Order shall be determined in accordance with Subsections B through G.
Whether stipulated in the Bid, itemized in the approved Schedule of Values or renegotiated, the unit prices used for payment constitute the total adjustment with no further costs owed for overhead, impact, profit, delay or impact to unchanged portions of the Contract, or any other reason. The unit price shall be full and final compensation as described in Subsection D.
The cost proposals for renegotiated unit prices shall be presented in accordance with the provisions of Subsections B through G. Should any Bid Item be deleted in its entirety, the amount bid for that bid item shall be subtracted from the total Contract amount. The Contractor shall be paid only for the actual cost incurred prior to the notification of such deletion for that Bid Item.
B. Lump Sum
The Engineer and the Contractor may mutually determine a total sum for the Extra Work. The Contractor shall summarize the total cost and furnish a breakdown of the proposed lump sum costs satisfactory to the Engineer in accordance with Subsections B through G. Such lump sum costs shall be full and final compensation as described in Subsection D. The Contractor’s quotation shall conform to the requirements of Section 01251- Change Order Requests, and be submitted in the Change Order Cost Summary Form provided (see Attachment 01251-A1). The Change Order Cost Summary Form cannot be used to nullify or supercede any specification or contractual provision.
If the method or amount of payment cannot be agreed prior to performing the Extra Work, the Engineer may unilaterally issue a Change Order in the amount determined reasonable by the Engineer for the Extra Work and direct the Contractor to proceed immediately. The Engineer also has the option to issue a Change Order directing the Work be done on a Time and Materials basis with the Contractor providing all labor, equipment, and materials necessary to complete the Work in a satisfactory manner and within a reasonable period of time.
Estimates for lump sum quotations and accounting for Time and Materials work shall be limited to direct expenditures necessitated specifically by the subject Extra Work, and shall be segregated as follows:
1. Labor, up to and including working general foremen, who are directly assigned to the Extra Work. Employees identified as superintendents or non-working general foremen shall not be charged as labor on Extra Work.
The labor costs shall include actual documented payroll costs including wages, payroll taxes as established by law (i.e., FICA, Federal and State Unemployment Taxes), fringe benefits as established by negotiated labor agreements, and any insurance costs (such as Worker's Compensation and General Liability Insurance but shall not include Automobile Liability Insurance or any other insurance costs). A detailed breakdown of those Redlands Regular Meeting of 06-20-2023 1148 of 1523
CHANGE ORDERS 01254-3
subcomponents of labor costs, by all crafts shall be submitted to the Engineer, by the Contractor and all Subcontractors, for approval, as part of the documentation of labor costs, within ten (10) working days after issuance of the Notice to Proceed. No other subcomponents of labor costs shall be considered, unless approved in writing by the Engineer.
The labor cost is not allowed to be increased by using labor classifications with paygrades higher than necessary to accomplish the Work.
2. Materials: The cost of materials used in performing the Extra Work will be the cost, including sales tax and freight, to the purchaser, whether Contractor, Subcontractor or other forces, from the supplier thereof, except as follows:
a. Cash or trade discounts available to the purchaser shall be credited to the City notwithstanding the fact that such discounts may not have been taken by the Contractor.
b. For materials secured by other than a direct purchase and direct billing to the purchaser, the cost shall be deemed to be the price paid to the actual supplier as determined by the Engineer. Supplier markup, except for actual costs incurred in the handling of such materials, will not be allowed.
c. Payment for materials from sources owned wholly or in part by the purchaser shall not exceed the price paid by the purchaser for similar materials from said sources on contract items or the current wholesale price for such materials delivered to the Jobsite, whichever price is lower.
d. If, in the opinion of the Engineer, the cost of materials is excessive, or the Contractor does not furnish satisfactory evidence of the cost of such materials, then the cost shall be deemed to be the lowest current wholesale price for the quantity concerned, delivered to the Jobsite less cash or trade discount. The City reserves the right to furnish materials for the Work and no claim shall be made by the Contractor for costs and profit on such materials.
e. For the purposes of this Section, a "Supplier" is defined as any person or persons, firm or business, who supplies materials of construction and/or permanent equipment, but who does not perform any portion of the Work of the Contract on site, for the Contractor, except that labor or labor supervision which may be required by some manufacturers as part of their equipment installation for warranty or other purposes.
Redlands Regular Meeting of 06-20-2023 1149 of 1523
CHANGE ORDERS 01254-4
3. Equipment Costs, including ownership, lease or rental costs, as well as operating costs, for individual equipment units whose replacement value is in excess of $500. Transportation and set up costs shall be included, but only if the equipment is imported to the worksite solely to perform work on the Extra Work described in the Change Order and the Contractor can demonstrate that the changed work cannot or could not be performed economically with equipment already at the site. Equipment costs shall be determined in accordance with the requirements set forth in Subsection G.
4. Small tools, equipment, consumables and incidental costs: No separate payment will be made for the use of small tools or equipment with a replacement value of $500 or less. This applies to tools and equipment owned by the Contractor or its subcontractors of any tier. Also, no separate payment will be made for fuel, lubricants, tool or equipment repairs, tool or equipment maintenance, consumables, drinking water, sanitary facilities or other incidentals. These costs are already included as a part of Markup.
5. Subcontractor Costs, including their overhead and profit, provided that such costs are direct costs to the Contractor for performing the Extra Work as set forth in Subsections B through G.
C. Time and Materials Work
The costs of all Changed/Extra Work submitted under the Time and Materials (T&M) method shall be formulated in accordance with the provisions of Subsections B through I.
Unless otherwise stipulated on the Change Order, the “Not-to-Exceed” amount for all T&M Change Orders is $10000. The Contractor is responsible for tracking costs and for notifying the Engineer in writing when costs approach 50% and 75% of the “Not-to-Exceed” amount. In addition, if the Changed/Extra Work cannot be completed within the “Not-to-Exceed” limit, the Contractor shall notify the Engineer in writing, and in a timely manner, that the limit requires an increase.
The City will only reimburse eligible costs up to the “Not-to-Exceed” amount.
The Contractor shall notify the Inspector at the beginning of each day when Changed/Extra Work is being performed. The Contractor shall notify the Inspector of the Changed/Extra Work being performed and describe the personnel involved, whether by Contractor forces or by its subcontractors at any tier. Failure to notify the Inspector prior to the start of Changed/Extra Work serves as the Contractor’s waiver to claim for compensation on that day.
For each working day, the Contractor shall submit a “Daily Extra Work Report” (DEWR) to the Inspector. The “Daily Extra Work Report” shall summarize labor, Redlands Regular Meeting of 06-20-2023 1150 of 1523
CHANGE ORDERS 01254-5
equipment and materials supplied. The Inspector will only consider Forms that are properly completed as described below.
1. Separate forms must be used for labor and for equipment/materials.
2. Labor, equipment, material or expenditures that are not included on The DEWR are ineligible for payment. There will be no exceptions to this requirement. It is the responsibility of the Contractor to include any and all items of labor, equipment, or material for which it requests compensation for each day’s work completed.
3. Information required on the Labor form shall include name of personnel, personnel classification, and only the number of hours worked on Changed/Extra work for the day being reported. Since the overhead allowance already includes all necessary supervision, any hours for additional supervision or non-working foremen are ineligible for additional payment. The premium pay for a general foreman is eligible for payment only if the general foreman is a working foreman and a general foreman was required by a Union Labor Agreement or otherwise approved by the Inspector. The general foreman rate is eligible for payment only during the time that a general foreman was required for the Changed/Extra Work.
4. Information required on the Equipment/Material shall include Contractorowned equipment and/or tools, and rented equipment or tools for which compensation is requested. Information shall include the type of equipment, size of equipment, equipment identification number, appurtenances, and only the number of hours worked on the Changed/Extra work.
5. The only allowable materials are materials delivered to the job site and/or incorporated only into the Changed/Extra work. The allowable materials shall be listed on the T&M sheet for the day that they are delivered to the job site and/or incorporated into the Changed/Extra work.
6. Delivery ticket(s) and/or bill(s) of lading for rental equipment and/or tools delivered to the site and/or material incorporated into the work for the day being reported must be attached with the T&M sheet for that day. No payment will be allowed for materials and/or rented equipment unless receipt(s) or bill(s) of lading is attached. If the request for payment is not substantiated by original vendor/supplier invoices, acceptable copies of original invoices, or other documentation acceptable to the Inspector, the City may establish the cost of the item(s) at the lowest possible wholesale price or rental rate applicable while the work was being performed.
Redlands Regular Meeting of 06-20-2023 1151 of 1523
CHANGE ORDERS 01254-6
7. Failure to submit the required “Daily Extra Work Report of Time and Material Work” by the close of the next working day shall waive all rights for that day unless otherwise approved by the Inspector. Work that cannot be substantiated by a “Daily Report”, approved and signed by the Inspector, is ineligible for payment.
8. The Contractor is responsible for preparing the “Daily Extra Work Report” for work by its Subcontractors and submitting the Forms to the Inspector on time.
9. The Contractor must have each “Daily Extra Work Report” verified by the Inspector. After the “Daily Extra Work Report” is approved by the Inspector, both the Contractor and Inspector sign the report. The original “Daily Extra Work Report” is retained by the Inspector with a copy provided to the Contractor.
10. When the “Daily Extra Work Report” is signed by the Inspector and the Contractor, it is binding on the Contractor and its Subcontractors.
11. When agreed to by the Inspector, the Contractor may submit a supplemental “Daily Extra Work Report” for labor, materials, or equipment for which the Contractor requests compensation but failed to list on the original daily report.
a. These supplemental forms shall be marked “SUPPLEMENTAL”. b. Unless otherwise approved by the Inspector, the supplemental forms may only be submitted for approval up to two (2) working days following the date when the work was performed.
No payment will be allowed for labor, materials, or equipment included on T&M sheets not signed by the Contractor and the Inspector. Payment will not be allowed for labor, materials, or equipment included on T&M sheets signed by anyone other than the Inspector or the Inspector’s immediate supervisor.
D. General
It is the intent of the City to settle all Change Orders full and final at the time the Change Order is issued. Therefore, the following paragraph shall be made a part of all Change Orders, whether included or not on the actual change order:
“The compensation (time and cost) set forth in a Change Order comprises the total compensation due the Contractor, all Subcontractors, and all Suppliers, for the Work or change defined in the Change Order, including impact on unchanged work. By signing the Change Order, the Contractor acknowledges and agrees on behalf of himself, all Subcontractors, and all Redlands Regular Meeting of 06-20-2023 1152 of 1523
CHANGE ORDERS 01254-7
Suppliers, that the stipulated compensation includes payment for all work contained in the Change Order, plus all payment for the interruption of schedules, extended field overhead costs, delay, and all impact, ripple effect or cumulative impact on all other work under this Contract. The signing of the Change Order indicates that the Change Order constitutes full mutual accord and satisfaction for the change, and that the time and/or cost under the Change Order constitutes the total equitable adjustment owed the Contractor, all Subcontractors, and all Suppliers as a result of the change. The Contractor, on behalf of himself, all subcontractors, and all Suppliers, agrees to waive all rights, without exception or reservation of any kind whatsoever, to file any further claim related to this Change Order.
No further claim or request for equitable adjustment of any type for any reasonably foreseeable cause shall arise out of or as a result of this Change Order or the impact of this Change Order on the remainder of the Work under this Contract.”
Costs which shall not be paid in Change Orders under this Contract include, but are not limited to, interest costs of any type; claim preparation or filing costs; legal expenses; the costs of preparing or reviewing proposed Change Orders or Change Order proposals; lost revenue; lost profits; lost income or earnings; rescheduling costs; costs of idled equipment when such equipment is not at the site or has not yet been employed on the Work; lost earnings or interest on unpaid retainage; claims consulting costs; and the costs of corporate officer or staff visiting the site; any compensation due to the fluctuation of foreign currency conversion or exchange rates; loss of other business; changes in taxes or increased tax rates of any kind or any costs identified as unallowable under the provisions of the Federal Acquisition Regulations.
Extensions of time shall be based solely upon the effect of delays to the Work as a whole. Extensions of time shall not be granted for delays to the Work, unless the Contractor can clearly demonstrate, through analysis of the current updated schedule, that the delay to the Work as a whole arose or will arise from causes other than normal weather, beyond the control and without fault or negligence of the Contractor, or any Subcontractor, at any tier, and that such delays did or will, in fact, delay the progress of the Work as a whole. The Contractor shall not be entitled to a time extension unless it submits a Time Impact Analysis which is a calculation of the extent of the delay to the end date of the Work and which shows that the Work has been or will be extended beyond the current Contract completion date. A Time Impact Analysis is a scheduling procedure which utilizes the networking techniques (fragnets) and a written analysis of the facts associated with the alleged delay to demonstrate the effect of the alleged delay on the critical path of the schedule. A "fragnet" is defined as a sequence of new activities and/or activity revisions that are proposed to be added to the existing current updated schedule to demonstrate (mathematically and graphically) the influence of the alleged delay on the end date of the Work and shall be the sole method for incorporating delays and impacts into the schedule. The objective of a Redlands Regular Meeting of 06-20-2023 1153 of 1523
CHANGE ORDERS 01254-8
Time Impact Analysis is to pinpoint, isolate, and quantify all time impact associated with a specific issue and determine its time relationship to past or current delays. Time extensions shall not be allowed for delays to parts of the Work that are not on the critical path of the currently approved monthly updated project schedule. Time extensions shall not be granted, nor delay damages of any kind whatsoever paid to the Contractor, until all available float, slack, or contingency time on the project is used and the end date of the Work is moved beyond the current, adjusted Contract completion date.
The cost summary, cost breakdowns and requests for cost reimbursement submitted by the Contractor (for delay, disruption, hindrance and interference associated with the changes, additions, deletions or extras) shall be itemized in a manner that, with mathematical certainty and without reliance upon probabilities or inferences, segregates the direct, actual reimbursable costs associated with each individual, change, addition, deletion, extra and (on an event-by-event basis) each individual delay or disruption event. Such cost summaries, breakdowns or requests shall not be based, in whole or in part, upon any methodology (such as “total cost” or “modified total cost” methodologies) that purports to calculate the Contractor’s additional costs of performance of the extra, change, addition or deletion (including without limitation the additional costs of delay, disruption or other impact) based on the difference between Contractor’s total actual Project or line item costs (with or without fee) and its original bid estimate for the Project or any original bid estimate line item. In connection with the foregoing, Contractor represents and warrants that it has the ability to generate and maintain complete and accurate cost accounting records that will reflect (i) the actual costs incurred or saved for each individual item of Extra Work, change, addition, deletion (including without limitation any costs of associated delay, disruption, interference, hindrance and the cumulative impact of each extra, change, addition, deletion on other parts of the Work); and, (ii) on an event-by-event basis, the effect of each delay or disruption that forms the basis of each request for extension of time, regardless of their scope, number, complexity, cumulative effect, or time of issuance or occurrence.
Except as provided in Section 6-6 of the General Conditions, Contractor shall have no right to recovery of any compensation, costs, expenses or damages resulting from delay, disruption, interference, or hindrance in the performance of the Work (including without limitation interruption of schedules, excess or extraordinary extended field and indirect overhead costs, loss of productivity and the impact, ripple or cumulative effect on other Work).
Contractor waives any claim or rights and remedies based on abandonment, quantum merit, rescission or other similar legal theory by reason of any of the following circumstances, which the Contractor acknowledges and agrees are within the reasonable contemplation of the parties: (i) changes, additions, deletions and extras to the Work after execution of the Contract and issued from time to time throughout the period of construction, regardless of their scope, Redlands Regular Meeting of 06-20-2023 1154 of 1523
CHANGE ORDERS 01254-9
number, cumulative value, or complexity, to correct errors, omissions, conflicts, and ambiguities in the Contract Documents, or to implement discretionary changes to the scope of Work requested by the City; (ii) the issuance and performance of changes, additions, deletions and extras in a manner that is not in sequence with the as-built or as-planned progress of the Work; (iii) changes due to Differing Site Conditions; (iv) suspensions of the Work or parts thereof, or limitations on access to portions or all of the Work, for the convenience of City or in the interests of the Project; (v) delay or disruption to the Work due to failure of the City, Engineer or Inspector to timely perform any contractual obligation.
E. Markups – Overhead and Profit
1. In addition to the direct expenditures specified for labor, materials and equipment in Subsection B, a lump sum will be paid for all overhead and profit, including: All insurance costs other than specifically mentioned in this Section, all field and office supervisors and assistants, all onsite project administration, security costs, the cost of small tools and consumables, incidental job burdens, and all general home office expenses and no separate allowance will be made therefor. Assistants to field and office supervisors include all clerical, stenographic, and general office help. Incidental job burdens include, but is not limited to, office equipment and supplies, temporary toilets, telephone, utilities, safety equipment, warning devices, personal protective equipment, and conformance to OSHA requirements. Project administration includes, but are not limited to, review and coordination, estimating, engineering, scheduling, and expediting relative to Change Orders, and updating and furnishing Record Drawings to incorporate changes, schedule update, supervision not applied solely to the Work of the Change Order, home office salaries and expenses, and City of Redlands Business Tax. Such lump sum shall conform to the following schedule of percentages of the total amount of direct expenditures of the Contractor and subcontractors.
(a) Work by Contractor. The following percentages shall be added to the Contractor’s costs and shall constitute the markup for all overhead and profits:
1) Direct Labor 20%
2) Direct Materials 15%
3) Direct Equipment 15%
(b) Work by Subcontractor. When all or any part of the extra work is performed by a Subcontractor, the markup established in (a) shall be applied to the Subcontractor’s actual cost of such work. A markup of 10 percent on the first $5,000 of the subcontracted portion of the extra work and a markup of 5 percent on work added in excess of $5,000 of the subcontracted portion of the extra work may be added by the Contractor.
Redlands Regular Meeting of 06-20-2023 1155 of 1523
CHANGE ORDERS 01254-10
2. Bonds and Insurance
An additional allowance of one percent (1%) of all direct costs (less markup) is allowed.
3. Add/ Deduct Changes
The overhead rates determined above shall be applied to all additive Change Orders, except those utilizing as-bid Unit Prices listed in the Bid Proposal.
Any change in the Work involving both extras and credits shall show a net total cost, including subcontracts. Allowances for overhead and profit to the net total cost, as specified herein above, shall be applied if the net total cost is an extra; overhead and profit allowances shall not be applied if the net total cost is a credit. The estimated cost of deductions shall be based on labor and material prices on the date the Contract was signed.
4. When all or any part of the extra work is performed by a Subcontractor, the markup established in subsection 1.1.E.1 shall be applied to the Subcontractor’s actual cost of such work. A markup of 10 percent on the first $5,000 of the subcontracted portion of the extra work and a markup of 5 percent on work added in excess of $5,000 of the subcontracted portion of the extra work may be added by the Contractor.
F. City Furnished Materials, Equipment and Services
The Engineer reserves the right to furnish materials, equipment and services deemed expedient for use on the Changed/Extra Work. The Contractor shall have no claim for profit or overhead on the cost of such materials, equipment and services.
G. Equipment Costs
The rates for rental or leased equipment shall not exceed the rates listed in the Caltrans Labor Surcharge and Equipment Rental Rates (Caltrans LS&ERR). For T&M Change Orders, the rates are established by the actual paid invoice(s) that comply with the requirements of Subsections G.1 and G.3. Owned equipment costs shall not exceed the rates established by Subsection G.2. The most recent published edition in effect at the commencement of actual equipment use shall be used.
The rates paid for any rented or leased equipment or tools shall include the cost of fuel, oil, lubrication, supplies, small tools, necessary attachments, repairs and maintenance of any kind, depreciation, storage, insurance and all incidental costs associated with the operation of the equipment or tools.
Redlands Regular Meeting of 06-20-2023 1156 of 1523
CHANGE ORDERS 01254-11
It is the responsibility of the Contractor to include any appurtenances added to equipment which would increase the basic rate for said equipment (i.e., hoe-ram, oversize bucket, and etcetera) as established in the acceptable rental rate guide.
All equipment and/ or tools shall be acceptable to the Inspector, in good working condition, suitable for the purpose for which it is to be used, and necessary to complete the Changed/Extra Work. Payment will be based on the manner in which the equipment was actually powered, operated and modified per the equipment manufacturer’s recommendations.
1. Rented or Leased Equipment
For equipment rented or leased (including lease with purchase option) in arm's length transactions from outside vendors, the Contractor shall be paid the actual invoiced, rented or leased rates provided that the invoiced lease or rental rates do not exceed the rates set forth in the Caltrans LS&ERR. Arm's length rental or lease transactions are those in which the firm involved in rental or lease of such equipment is not associated with, owned by, have common management, directorship, facilities, or stockholders with the firm renting the equipment. Submittal by a Contractor of a rental or leased invoice from the lessor will be prima facie proof of compliance with the above. However, such invoices are not conclusive proof; if questioned, the burden of proof remains with the Contractor. In no event shall the leased equipment rate billed to the City be at rates exceeding those prescribed in the following table:
Actual Usage (Change Order
& Contract Work Combined) Payment Category
Less than 8 hours Hourly Rate
8 or more hours but less than 7 days Daily Rate
7 or more days but less than 30 days Weekly Rate
30 calendar days or more Monthly Rate
a. When in Use:
Actual equipment use time documented by the Inspector shall be the basis that the equipment was utilized on the changed work and paid for under the Change Order. In addition to the lease or rental rate, equipment-operating costs shall not exceed the estimated hourly operating rate as set forth in the Caltrans LS&ERR. The hours of operation shall be based upon actual equipment usage on the changed work as recorded by the Inspector. For multiple shift work sequences, the allowable equipment rate shall not exceed fifty percent (50%) of the base rate, for second or third shifts. b. When Idle:
Redlands Regular Meeting of 06-20-2023 1157 of 1523
CHANGE ORDERS 01254-12
Idle equipment is equipment on site and necessary to perform the Work under the change but not in actual use due solely to the impact of the changed work. Equipment operating costs due to idle time, documented by the Inspector, shall be paid at the rate determined in “G” (1) above. Idle time shall include a reasonable time allowance to and from the project site.
Payment for equipment or tools shall be limited to hours actually worked on the Changed/Extra Work if the equipment or tool is already on site for Work under the original Contract. No “standby” time will be paid for equipment already on site for Work under the original Contract.
If equipment or tools are used intermittently and, when not in use, could be returned to the rental source at less expense than holding it at the work site, it shall be returned, unless the Contractor elects to keep it at the work site at no expense to the City.
2. Owned and Other Equipment
Equipment rates for owned equipment or equipment provided in other than arm's length transactions shall not exceed the total hourly costs as set forth in the Caltrans “Labor Surcharge and Equipment Rental Rates” effective at the time the work is performed. (The Caltrans equipment rental rates are available on the internet at
http://www.dot.ca.gov/hq/construc/equipmnt.html.) If the equipment is not listed in Caltrans LS&ERR, then the Rental Rate Blue Book shall be used. When using the Blue Book, the hourly rate for any period less than 7 days shall be the weekly rate divided by 40, plus the Operating Cost.
Except as noted herein below, this equipment hourly rate plus the estimated operating cost per hour from the Blue Book will be paid for each hour the equipment actually performs the Extra Work. Daily records listing the equipment units and their respective operators, identification code, and actual usage on the Work under the Change Order, as certified at the end of each work day (or work shift if the Work is being performed in multiple work shift sequence) by the Inspector shall be the record upon which actual equipment use shall be based. For multiple shift work sequences, the Caltrans overtime factor shall be applied (When using the Blue Book one-half the Non-Operating Cost will be deducted for second and third shifts. The Non-Operating Costs are the Blue Book monthly or weekly/40 rates, as applicable.). It is agreed that this rate shall represent payment in full for all the Contractor’s direct costs.
a. When Idle:
Redlands Regular Meeting of 06-20-2023 1158 of 1523
CHANGE ORDERS 01254-13
Payment for equipment necessary to be on the site to complete the Work, but not in actual use due solely to the impact of the changed work, shall be paid per the table in Caltrans Standard
Specifications Section 9-1.03A(3b), provided that its presence and necessity on the site has been documented by the Inspector, and further provided that the equipment was idled solely by actions of the City. Idle equipment time will only be paid as a function of delays specifically directed or caused by the City's actions. In no event shall the idle time claimed in a day for a particular piece of equipment exceed the normal work schedule established for the project - usually eight (8) hours per day or forty (40) hours per week, and excluding Saturdays, Sundays, and holidays. For multiple shift work sequence, the allowable idle equipment rate shall not be allowed, for second or third shifts. It is agreed that this rate shall represent payment in full for all the Contractor’s direct costs.
3. Equipment Haulage and Set Up Costs
Documented and actual equipment haulage and set up costs shall be paid for, if applicable as set forth in Subsection B.3.
4. Other Equipment Cost Guides
In the event that a piece of equipment used on a Change Order is not listed in Caltrans or the Blue Book, costs may be derived from the Associated General Contractor’s of America Equipment Ownership Guide, the Associated Equipment Dealers Guide, or the Equipment Rate Guide published by the U.S. Army Corps of Engineers as adjusted appropriately for the type of work and use and the regional area of the Work under this Contract.
H. Records
At any time should the Contractor deviate substantially from the schedule, method and sequence of operation, equipment, cost or pricing data furnished by the Contractor and agreed to by the City in connection with the Change Order or should the City determine that any price negotiated in connection with the Change Order is defective due to such deviation or the fault of the Contractor, the City reserves the right to reduce the Change Order cost and reissue the Change Order at the amount in which the City determines to be the actual costs to complete the change.
Whenever any material or process is indicated or specified by patent or a proprietary name, or by name of a manufacturer in the Change Order, such direction shall not relieve the Contractor’s responsibility or obligation to perform Redlands Regular Meeting of 06-20-2023 1159 of 1523
CHANGE ORDERS 01254-14
work in accordance with the contract requirements. The Contractor shall be solely responsible for, and have control over construction means, methods, techniques, sequences and procedures, coordination of all portions of the contract and Change Order work.
The Contractor shall on a weekly basis submit an approximate accounting of the amount expended on the Time and Materials work to date and an estimate of the Impact to the time of performance of work.
I. Partial Payments for Time and Materials Work.
Progress payments for Time and Materials work shall only be made if the anticipated cost of the changed work is in excess of $50,000 and/or the time to perform the changed work will exceed two (2) months duration. To receive payments for Time and Materials work, the Contractor shall submit to the Engineer an invoice of the daily reports which were verified by the Inspector, with details and documents, verifying the Contractor’s and Subcontractor's actual costs incurred for the Time and Materials work as set forth in Subsections B through H. Costs shall be submitted within thirty (30) calendar days after the T&M work has been satisfactorily completed unless an extension of time for submittal is authorized in writing by the Inspector.
END OF SECTION
Redlands Regular Meeting of 06-20-2023 1160 of 1523
SCHEDULE OF VALUES 01298-1
SECTION 01298 SCHEDULE OF VALUES
1.1 GENERAL
A. The Schedule of Values shall be used as a basis for determining progress payments on a lump sum contract or any designated lump sum bid item. The Schedule of Values shall be a schedule of cost loaded construction activities equal, in total, to the lump sum bid and shall be in such form and sufficient detail to correctly represent a reasonable apportionment of the lump sum. Prior to submitting an invoice for payment, the CONTRACTOR shall have submitted a detailed Schedule of Values and obtained approval from the ENGINEER.
B. Each lump sum bid item on the Schedule of Work and Prices, as set forth in the Bid must be broken down separately. The breakdown of each lump sum bid item must cover the cost of construction required by the contract documents for that item. The sum of the values for the construction activities, within a bid item, must equal the total bid amount for that item. The breakdown shall include subcontract amounts which shall not deviate from the amounts submitted in the Bid Proposal. The CONTRACTOR shall provide certification from the Subcontractors certifying the subcontract amounts.
C. Each activity in the Schedule of Values shall delineate one construction activity.
For example, the placement of concrete between construction joints, the construction of an electrical duct bank or pipeline between points A & B. The costing for each activity should include all costs for the labor and materials or equipment required to complete the activity. For example, concrete construction activities should include all costs for the forming, placing of reinforcement, placing concrete and curing. The cost for pipeline construction activities should include materials, equipment and installation including pipeline supports or thrust blocks. The excavation and backfill for a pipeline or structure may be separate activities. The Contract Price breakdown shall include the itemized costs for the plant establishment and any maintenance services to be performed before the final project acceptance is made. No non-construction activity shall be cost loaded.
D. The CONTRACTOR shall use cost loaded construction activities from the Construction Schedule as a Schedule of Values. Each construction activity shall be encoded to its bid item and a sort provided for each bid item totaling the cost loaded amount. The total of the Cost Loaded amounts for each bid item shall equal the amount bid for that item. The total of the Schedule of Values shall equal the current Contract value at all times. At any time during the progress of the Work of the Contract the INSPECTOR reserves the right to review the cost loading of the Schedules of Values and direct necessary revisions. When requested by the INSPECTOR, the CONTRACTOR shall provide all information necessary to substantiate the cost loading.
Redlands Regular Meeting of 06-20-2023 1161 of 1523
SCHEDULE OF VALUES 01298-2
E. Attached are samples of the Schedule of Values. The City will provide project specific Schedule of Values for the CONTRACTOR to use throughout the project at the Preconstruction Meeting. The Schedule of Values must be used by the CONTRATRACTOR at the time of each progress payment.
END OF SECTION
Redlands Regular Meeting of 06-20-2023 1162 of 1523
SCHEDULE OF VALUES 01298-3
Redlands Regular Meeting of 06-20-2023 1163 of 1523
SCHEDULE OF VALUES 01298-4
Redlands Regular Meeting of 06-20-2023 1164 of 1523
SCHEDULE OF VALUES 01298-5
Redlands Regular Meeting of 06-20-2023 1165 of 1523
SCHEDULE OF VALUES 01298-6
THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 06-20-2023 1166 of 1523
CONSTRUCTION SCHEDULE 01321-1
SECTION 01321 CONSTRUCTION SCHEDULE
1. THE REQUIREMENT
A. It is expressly understood and agreed that the time of beginning, the rate of progress, and the time of completion of the Work are of the essence of this Contract.
B. The CONTRACTOR’S representative in charge of scheduling is required to attend all meetings pertaining to scheduling and progress of the Work.
C. The CONTRACTOR shall submit to the ENGINEER 3 hard copies and the electronic file of the CONTRACTOR'S Construction Schedule (the schedule) at the time of the preconstruction meeting. The schedule shall be either a Critical Path Method (CPM) Network or a detailed Bar Chart with the critical path clearly shown. If the CPM network option is used, then Primavera Project Management or Microsoft Project shall be the scheduling software. If a detail Bar Chart is used, Microsoft Excel shall be the software utilized. The schedule shall include the following:
1. Activity ID,
2. Activity Description,
3. Start date for each activity,
4. Finish date for each activity,
5. Original duration,
6. Predecessor,
7. Successor,
8. Percent Complete,
9. Remaining Days.
A minimum of seven (7) calendar days for review of each schedule. Schedule activities shall be of sufficient detail to assure adequate planning has been done for proper execution of the Work and such that, in the sole judgement of the ENGINEER, it provides an appropriate basis for monitoring progress. The schedule shall begin with the date of issuance of the Notice to Proceed and conclude with the date of Final Completion shown in the Contract. Submittal and approval of the schedule in accordance with the requirements of this Section is a condition precedent to the issuance of any payments under this Contract. Once the schedule is approved it will become the baseline schedule and must be shown and compared on all subsequent schedule submittals.
D. Float, slack time, or contingency within the schedule (i.e., the difference in time between the project's early completion date and the required Contract Completion date), and total float within the schedule, is not for the exclusive use of either the CITY or the CONTRACTOR, but is a jointly owned expiring resource available to and shared by both parties. Pursuant to this float sharing requirement, use of Redlands Regular Meeting of 06-20-2023 1167 of 1523
CONSTRUCTION SCHEDULE 01321-2
float suppression techniques shall be cause for rejection of the schedule and any revisions or updates.
E. Time extensions shall not be granted nor delay damages paid until a delay occurs which is beyond the control and without the fault or negligence of the CONTRACTOR and its Subcontractors or Suppliers, at any tier, and which extends actual performance of the Work beyond the current Contract completion date and the completion date projected by the current, approved, updated schedule. If the delay occurs along a path, which the current approved Construction Schedule update projects late completion prior to addition of any CITY caused delay, then the time extension allowed will be only for the additional delay demonstrated by the approved Time Impact Analysis. Time extensions shall be granted only if they are clearly demonstrated by the CONTRACTOR through the submittal, within seven (7) calendar days after the delay occurs, of a Time Impact Analysis which demonstrates the estimated impact on the end date of the Work; is based upon the updated Construction Schedule current as of the month the delay occurred; and demonstrates that the delay cannot be mitigated, offset, or eliminated through such actions as revising the intended sequence of Work or other means.
If a time extension if granted by the CITY, the updated schedule reflecting the change shall become the baseline and be reflected schedule and must be shown and compared on all subsequent schedule submittals.
Since float time within the Construction Schedule is jointly owned, it is acknowledged that CITY caused delays on the project may be offset by CITY caused time savings (e.g. critical path submittals returned in less time than allowed by the Contract or approval of substitution requests which result in a savings of time to the CONTRACTOR). In such an event, the CONTRACTOR shall not be entitled to receive a time extension or delay damages until all CITY caused time savings are exceeded and the Contract completion date is also exceeded.
F. If the initial schedule submitted shows completion of Work more than thirty (30) calendar days in advance of the Contract completion date, the ENGINEER may, at no cost to the CITY, decrease the Contract duration by issuance of a Change Order which changes appropriate Milestone Date(s) and the Contract completion date to the completion date reflected on the schedule. Any approved schedule, revision, or update having an early completion date shall show the time between the early completion date and the Contract completion date as "project float".
G. Comments made by the ENGINEER on the schedule during review will not relieve the CONTRACTOR from compliance with all requirements of the Contract. The ENGINEER may request that the CONTRACTOR and all major Subcontractors (defined herein as being any Subcontractor, Sub-Subcontractor, or Supplier with five (5) percent or more of the value of the Contract) participate in Redlands Regular Meeting of 06-20-2023 1168 of 1523
CONSTRUCTION SCHEDULE 01321-3
review of any schedule submission. All revisions shall be submitted within seven (7) calendar days after the ENGINEER’S review.
H. Two copies of an updated schedule shall be submitted to the ENGINEER for approval with the submittal of each CONTRACTOR'S monthly payment request or the monthly payment request will be withheld. For those activities started but not yet completed at the time of submittal, the updated schedule shall reflect the percentage complete, as agreed between the CONTRACTOR and the INSPECTOR, and an estimate of the remaining duration. The monthly update of the schedule shall include an updated bar chart with logic arrows or network diagram and include the same additional data as required by Section 1.C. If the CPM network option is used, the schedule shall be calculated using remaining durations and the progress override option. The monthly update shall also include a complete, hard copy list of all the changes made from the previously approved submittal. If the schedule is done using Primavera, use a Claim Digger report for the list of changes.
I. The submittal of an updated schedule which meets the requirements of this Section, accurately reflects the status of the Work (for all previously accepted activities), and incorporates all approved changes into the schedule, shall be a condition precedent to the processing of the monthly payment application. (Actual and/or forecast dates for status of additional submittal cycles shall be added without the prior approval of the Engineer.) Updated schedules shall also be submitted at such other times as the ENGINEER may direct. Upon approval of a Change Order or issuance of a notice to proceed with a change, the approved change shall be reflected in the next schedule update.
J. If completion of any part of the Work, delivery of equipment or materials, or submittal of CONTRACTOR submittals is behind schedule and will impact the end date of the Work, the CONTRACTOR shall submit a written recovery plan acceptable to the ENGINEER for completing the Work by the current Contract completion date, if requested by the ENGINEER.
K. As a condition precedent to the release of any retained funds, the CONTRACTOR shall, after substantial completion of the Work has been achieved, submit a certified, final schedule which accurately reflects the manner in which the project was constructed and includes actual start and completion dates for all activities on the schedule.
END OF SECTION
Redlands Regular Meeting of 06-20-2023 1169 of 1523
THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 06-20-2023 1170 of 1523
CONSTRUCTION PROGRESS PHOTOGRAPHY 01322-1
SECTION 01322 CONSTRUCTION PROGRESS PHOTOGRAPHY
1.1 GENERAL
A. Required: Provide photographs taken at the Jobsite at the specified stages of Contracted Work in accordance with provisions of this Section.
1. The Contractor shall provide the City with photos with addresses identifying each property location, the direction the photograph was taken (facing North, South etc).
2. Take first photographs just before CONTRACTOR starts any work operations at the Jobsite.
3. Take final photographs when all Contracted Work has been completed, regardless of time interval since previous photographs were taken.
1.2 SUBMITTALS
Except as otherwise directed by the ENGINEER, submit all photographs electronically on a CD/DVD organized by phase of construction and location.
1.3 QUALITY ASSURANCE
Photographs and prints to be of professional quality; clear, in focus, with high resolution and sharpness, and with minimum distortion.
END OF SECTION
Redlands Regular Meeting of 06-20-2023 1171 of 1523
THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 06-20-2023 1172 of 1523
CONSTRUCTION STATUS REPORTS 01323-1
SECTION 01323 CONSTRUCTION STATUS REPORTS
1.1 REQUIREMENTS
A. Daily Status Report
The Contractor shall complete a daily report indicating manpower, major equipment, subcontractors, unusual occurrences and etc., involved in the performance of the work. The daily report shall be completed on forms prepared by the Contractor and approved by the City and shall be submitted to the Project Manager at the conclusion of each work week.
The Contractor shall also have workers on the project sign in and out each day on the City of Redlands Daily Sign In Sheet which shall state the name, times in and out and the work performed by each worker on the project each day. The completed Daily Sign In Sheets shall be submitted to the City of Redlands Project Manager at the end of each work week. Failure to submit daily reports and daily sign in sheets to the Project Manager on a weekly basis will result in a possible and temporary suspension of work until reports are submitted.
B. Weekly Status Report
During the construction phase of the Work, the CONTRACTOR shall submit weekly written status reports to the ENGINEER and the INSPECTOR. The report shall contain a record of inspections and tests, not performed by CITY forces, for all Work accomplished subsequent to the previous report and shall include the following information:
1. Type of work under way during the time frame of the report (e.g., earthwork, concrete work, structural steel erection, equipment manufacturing, component installation).
2. Inspections and tests, and location of inspections and tests that were made.
3. Results of inspections.
4. Reports of tests performed, including those specified, with the results of the tests, and acceptance criteria, including failures and remedial action to be taken. Test results, including all computations, shall be attached to the report form. Where test results cannot be completed by the time the report is submitted, a notation shall be made that the test was performed, including the approximate expected date that test results will be reported.
5. Report of any nonconforming items/activities. Nonconformance report forms designed solely for this purpose shall be utilized.
Redlands Regular Meeting of 06-20-2023 1173 of 1523
CONSTRUCTION STATUS REPORTS 01323-2
6. Results of inspections of material and equipment done upon their arrival at the Jobsite and prior to their incorporation into the Work. This includes, but is not limited to, compliance with approved submittals, damage, and proper storage requirements.
7. Offsite quality control activities.
8. Instructions received from the ENGINEER or INSPECTOR.
9. In all cases, the report must be verified and signed by the CONTRACTOR'S representative. The verification is to contain the statement that all supplies and materials incorporated in the Work are in compliance with the terms of the Contract except where noted.
C. 3 Week Look Ahead Schedule
During the construction phase of the Work, the CONTRACTOR shall submit 3 Week Look Ahead reports to the ENGINEER at the weekly progress meetings or as directed by the ENGINEER. The report shall include the following information:
1. Type of work under way during the time frame of the report (e.g., earthwork, concrete work, structural steel erection, equipment manufacturing, component installation).
D. Miscellaneous Submittals
CONTRACTOR shall prepare a Daily Construction Report recording the following information concerning events at the job-site and submit original copies to the ENGINEER at weekly intervals for approval:
1. List of Subcontractors and Sub-Subcontractors at the site, types of works and job location.
2. Count of CONTRACTOR’S personnel at the site, name, type of work, hours completed and job location.
3. Construction equipments at the site.
4. High and low temperatures, general weather conditions.
END OF SECTION
Redlands Regular Meeting of 06-20-2023 1174 of 1523
SUBMITTALS 01330-1
SECTION 01330 SUBMITTALS
1.1 THE REQUIREMENT
A. The CONTRACTOR shall furnish a schedule and list of all required submittals to the ENGINEER, including required submittals by all Subcontractors.
B. Wherever called for in these Specifications or on the plans, or where required by the ENGINEER, the CONTRACTOR shall furnish to the ENGINEER for review, two (2) hard copies and one electronic (PDF) copy of each submittal.
The term "submittal" as used herein shall be understood to include detail design calculations, design drawings, shop drawings, fabrication and installation drawings, erection drawings, lists, graphs, operating instructions, catalog sheets, data sheets, samples, and similar items. Unless otherwise required, said submittals shall be submitted to the ENGINEER at a time sufficiently early to allow review of same by the ENGINEER and to accommodate the rate of Construction Progress required under the Contract without delaying the Contract Work and with due regard for the possibility of resubmittals. All submittals shall be in English.
C. All design or shop drawings or other submittals shall be accompanied by a transmittal form for each submittal. Any submittal not accompanied by such a form may be returned, at the ENGINEER'S discretion, for resubmittal.
D. Normally, a separate transmittal form shall be used for each specific item or class of material or equipment for which a submittal is required. Transmittal of a submittal of various items using a single transmittal form will be permitted only when the items taken together constitute a manufacturer's "package" or are so functionally related that expediency indicates a review of the group or package as a whole. A multiple-page submittal shall be collated into sets, and each set shall be stapled or bound, as appropriate, prior to transmittal to the ENGINEER.
E. Shop Drawings shall show in detail the size, sections, and dimensions of all the member(s); the arrangement and construction of all connections and joints; all holes, straps, and other fittings required for attaching work and other pertinent details. When required, engineering computations shall be submitted. The CONTRACTOR shall be responsible for delivering reviewed copies of shop Drawings to all others whose work is dependent thereon. The CONTRACTOR shall maintain at the site of the Project, at all times, a complete file of approved Shop Drawings and manufacturers' data for this Project.
F. Except as may otherwise be provided herein, the ENGINEER will return prints of each submittal to the CONTRACTOR, with its comments noted thereon, within twenty (20) calendar days following their receipt by the ENGINEER. It is considered reasonable that the CONTRACTOR shall make a complete and acceptable submittal to the ENGINEER by the second submission of a submittal Redlands Regular Meeting of 06-20-2023 1175 of 1523
SUBMITTALS 01330-2
item. The CITY reserves the right to withhold moneys due the CONTRACTOR to cover additional costs of the ENGINEER'S review beyond the second submittal. Submittal will be returned to the CONTRACTOR with one of four (4) markings:
1. If a submittal is returned to the Contractor marked "NO EXCEPTIONS," formal revision and resubmission of said submittal will not be required.
2. If a submittal is returned to the Contractor marked "EXCEPTIONS NOTED," formal revision and resubmission of said submittal will not be required, unless specifically requested.
3. If a submittal is returned to the Contractor marked "RETURNED FOR CORRECTION," the Contractor shall revise said submittal and shall resubmit the originally required number of copies of said revised submittal to the Engineer.
4. If a submittal is returned to the Contractor marked "NOT ACCEPTABLE," the Contractor shall revise said submittal and shall resubmit the originally required number of copies of said revised submittal to the Engineer.
G. All Work for which Shop Drawings are required shall be performed in accordance with the reviewed and approved copies. Fabrication of an item shall not commence before the ENGINEER has reviewed the pertinent submittal and returned the copies to the CONTRACTOR marked either "NO EXCEPTIONS TAKEN," or "MAKE CORRECTIONS NOTED“. Revisions indicated on submittals shall be considered as changes necessary to meet the requirements of the Contract Documents and shall not be taken as the basis for claims for extra work.
H. All CONTRACTOR submittals shall be carefully reviewed by an authorized representative of the CONTRACTOR prior to submission to the ENGINEER.
Each submittal shall be dated, signed, and certified by the CONTRACTOR as being correct and in strict conformance with the Contract Documents. No consideration for review by the ENGINEER of any CONTRACTOR’S submittal will be made for any items which have not been so certified by the CONTRACTOR. All noncertified submittals will be returned to the CONTRACTOR without action taken by the ENGINEER, and any delays caused thereby shall be the total responsibility of the CONTRACTOR.
I. Should the Shop Drawings or manufacturers data (for submittals required by the Standard Specifications or the specifications) show variations from the Contract requirements, the CONTRACTOR shall make specific mention of such variations in the letter of transmittal, in order that, if acceptable, suitable action may be taken for proper adjustment of the Contract; otherwise the Redlands Regular Meeting of 06-20-2023 1176 of 1523
SUBMITTALS 01330-3
CONTRACTOR will not be relieved of the responsibility for executing the work in accordance with the Contract Documents, and the approved submittals.
J. The ENGINEER’S review of CONTRACTOR’S submittal shall not relieve the CONTRACTOR of the entire responsibility for the correctness of details and dimensions and conformance to the Specifications. The CONTRACTOR shall assume all responsibility and risk for any misfits due to any errors in the submittal. Any fabrication or other work performed in advance of the receipt of accepted submittals shall be entirely at the CONTRACTOR’S risk and expense.
The CONTRACTOR shall be responsible for the dimensions and the design of adequate connections and details.
K. CONTRACTOR’S Coordination:
1. ENGINEER will return and will not review unrelated submittals.
2. The CONTRACTOR may be required to provide drawings, setting diagrams and similar information necessary for proper coordination of Contracted Work. Such data shall remain between the CONTRACTOR and CONTRACTOR’S Subcontractor and will not be reviewed by the ENGINEER unless specifically called for in the Contract Documents.
3. ENGINEER will not review any required Structural Shop Drawings, Structural Calculations, etc., not prepared or signed by a State of California licensed ENGINEER.
4. ENGINEER will return and will not review any submittal requiring coordination with other submittals until such other submittals or required information is received by the Consultant or ENGINEER.
L. CONTRACTOR’S Submittals: CONTRACTOR’S submittals required for performance of Contracted Work, shall include, but are not limited to, the following:
1. Schedule of Values for all Lump Sum items within the Proposal.
2. Construction Schedule and Notification to ENGINEER of completion of each milestone or percentage increment of the Work as required.
3. Submittal Schedule
4. Daily Construction Reports
5. Shop Drawings and Structural Calculations.
6. Manufacturer’s Data and Specifications.
Redlands Regular Meeting of 06-20-2023 1177 of 1523
SUBMITTALS 01330-4
7. Samples
8. Templates
9. Certificate of Compliance
10. Construction Photographs
11. Substitutions
12. Record Drawings and Record Project Manual
13. Operation & Maintenance Manuals
14. Stock Materials, Spare parts, tools
15. Material Testing Results
16. Maintenance Logs and Maintenance Schedule.
M. CONTRACTOR shall conform to the provisions of the Contract Document and as may be specifically directed by the ENGINEER.
1. Preparation and processing of submittals shall be coordinated with Contracted Work operations, which include fabrication, purchasing and delivery of work items so as not to delay Contracted Work operations.
2. In each copy of the Submittal, mark every applicable material, product, equipment, manufacturer’s data, product information, color samples, rating or values, part and model numbers, etc. by red color circle. Each of the submittal items must be clearly distinguishable from other unrelated or similar items listed in the Manufacturer’s Catalog or Technical Specifications, Manuals, etc.
N. Coordination and Submittals:
1. Carefully review and coordinate all aspects of each item being submitted.
2. Carefully review contract drawings and technical sections, verify all work as laid out or indicated meeting the applicable codes and standards.
3. Ensure ample time for reviewing and processing of the submittals by the CITY or other authorized agencies, delays resulting from improper and untimely submittals shall be the responsibility of the CONTRACTOR.
Redlands Regular Meeting of 06-20-2023 1178 of 1523
SUBMITTALS 01330-5
4. Verify that all such submittal items conform to the Project Manual requirements noted in the Technical Sections.
5. Verify all site conditions and provide all required dimensions and measurements in Shop Drawings.
6. Where necessary, review the CITY’S comments, make changes and resubmit to local governing agencies for approval. Furnish the ENGINEER copies of the approved plans or drawings for review.
O. CONTRACTOR shall affix to each submittal, the CONTRACTOR’S signature certifying that required coordination has been performed and include on an attached label for processing and recording action taken, noting the following:
1. Name of the Project
2. Date of the Submittal
3. Name and address of Consultant
4. Name and address of the CONTRACTOR
5. Name and address of the Subcontractor(s)
6. Name and address of the Supplier
7. Name and address of the Manufacturer
8. Reference to Specification Section Number and Title
9. Reference to Drawing Sheet Number and detail(s)
10. Submittal Number
11. Priority Number and expected return date.
END OF SECTION
Redlands Regular Meeting of 06-20-2023 1179 of 1523
THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 06-20-2023 1180 of 1523
SUBMITTALS 01330-7
Redlands Regular Meeting of 06-20-2023 1181 of 1523
SUBMITTALS 01330-8
Redlands Regular Meeting of 06-20-2023 1182 of 1523
STORMWATER POLLUTION PREVENTION PLAN 01571-1
SECTION 01571 STORMWATER POLLUTION PREVENTION PLAN
PART 1 - GENERAL
This project is subject to the requirements of the General Permit for Storm Water Discharges associated with Construction and Land Disturbance Activities, under the California State Water Resources Control Board. Order No. 2009-0009-DWQ, CAS000002, and all amendments. All permit related documents can be located at the State Water Resources Control Board (SWRCB) website at www.waterboards.ca.gov. This project lies within the boundaries of the Santa Ana Regional Water Quality Control Board (RWQCB). The project is also covered by the municipal MS4 permit, Santa Ana-Order No. R8-2010-0036. Guidance manuals applicable to this project are the California Best Management Practices Handbooks found at www.cabmphandbooks.com.
The Contractor shall be responsible for complying with the SWPPP and all laws, codes, ordinances, and requirements of the governing agencies regarding the discharge of pollutants, pollution control devices, and any other related stormwater and non-stormwater requirements for this project, including but not limited to reporting, sampling, and amendments.
The Contractor shall have the necessary training and certifications to implement the SWPPP, conduct inspections and maintain the required water pollution control practices. See Section “QUALIFIED SWPPP PRACTITIONER (QSP)”.
The Contractor shall follow all requirements of the prepared job specific Storm Water Pollution Prevention Plan (SWPPP) including the Construction Site Monitoring Program Requirements (CSMP). The contractor shall provide a Qualified SWPPP Practitioner (QSP) to implement all requirements of the SWPPP. The QSP shall be responsible for monitoring and sampling as required by the CSMP.
Approval of the SWPPP must be completed prior to the start of construction activity. However, the contract time will commence.
PART 2 - STORMWATER POLLUTION PREVENTION PLAN PREPARATION If required under Order No. 2009-0009-DWQ, CAS000002, or its amendments, the Contractor shall prepare a SWPPP for the project. The SWPPP provides the general stormwater approach for the project and the minimum necessary BMPs. The contractor shall provide a Qualified SWPPP Practitioner (QSP) for this project and submit to the City copies of the required certifications or registrations for the QSP prior to SWPPP approval.
The California Storm water Quality Association (CASQA) has prepared a SWPPP template for use with Order No. 2009-0009-DWQ, CAS000002. The SWPPP template provides the general storm water approach for the project and the minimum necessary BMPs. The SWPPP template is not to be a considered a final and complete document until it has been completed and approved by a Qualified SWPPP Developer (QSD). The QSD is expected to include in the updated Final Redlands Regular Meeting of 06-20-2023 1183 of 1523
STORMWATER POLLUTION PREVENTION PLAN 01571-2
SWPPP necessary details pertaining to the methods and scheduling of construction and any additional necessary BMPs, based on the project approach.
The QSD shall use the CASQA SWPPP template for preparation of the SWPPP. The Caltrans SWPPP template shall not be used.
Within 5 days of the Notice to Proceed, Contractor shall submit two (2) hardcopies of the draft Storm Water Pollution Prevention Plan (SWPPP) for review. SWPPP review shall be in accordance with the requirements set forth in Section 01330 of the General Requirements. Once all of the noted revisions have been made and the SWPPP is complete for submittal to the State, two (2) final signed hardcopies and one (1) electronic copy of the SWPPP must be submitted to the Engineer for acceptance. The Contractor shall keep one copy of the approved SWPPP and approved amendments at the project site. The SWPPP shall be made available upon request by a representative of the City of Redlands, the Regional Water Quality Control Board or the State Water Resources Control Board. Requests made by the public or other third-parties for review of the SWPPP shall be directed to the Project Engineer. The Contractor shall notify the Engineer immediately when regulatory agencies request to enter, inspect, sample, monitor, or otherwise access the project site or the Contractor’s records pertaining to the water pollution control work.
Contractor shall immediately send all correspondences, notices of violation, enforcement actions or proposed fines, issued by a regulatory agency, to the Engineer.
The SWPPP shall be updated or amended as necessary or as required for compliance purposes.
All updates to the SWPPP shall be per the guidelines contained therein. A copy of the SWPPP must be kept at the project site at all times. In the case of a linear construction project (water, sewer, street), where no field office has been established, the copy of the SWPPP shall be kept by the contractor’s foreman in the vicinity of the actual construction and made available within thirty (30) minutes of request. The SWPPP shall be made available upon request by a City Inspector, a representative of the Regional Water Quality Control Board or the State Water Resources Control Board. Requests made by the public or other third parties for review of the SWPPP shall be directed to the City Engineer.
PART 3 - SWPPP IMPLEMENTATION
Unless otherwise specified, the Contractor shall be responsible throughout the duration of the project for installing, constructing, inspecting, maintaining, removing, and disposing of the water pollution control devices; and practices specified in the SWPPP, its amendments, or by the City Inspector. Unless otherwise directed by the City Engineer, the Contractor's responsibility for SWPPP implementation shall continue throughout temporary suspensions of work, regardless of reason, unless specified otherwise in writing by the City Engineer. Requirements for installation, construction, inspection, maintenance, removal, and disposal of water pollution control devices and practices shall conform to the requirements in the SWPPP and these special provisions.
The National Weather Service (http://www.srh.noaa.gov/) weather forecast shall be monitored and used by the Contractor on a daily basis. If there is a forecast of 50% or greater probability of precipitation in the project area, the necessary water pollution control devices, plans and practices shall be deployed prior to the onset of the precipitation and immediate notice provided Redlands Regular Meeting of 06-20-2023 1184 of 1523
STORMWATER POLLUTION PREVENTION PLAN 01571-3
to the City Engineer. The contractor’s QSP shall be required to prepare and submit a Rain Event Action Plan (REAP), if required, any time the probably of rainfall is 50% or greater.
For the purposes of erosion and sediment control, disturbed soil areas shall be considered active whenever the soil disturbing activities have occurred, continue to occur or will occur during the ensuing 14 days. Non-active areas shall be protected as prescribed in the General Construction Permit within 14 days of cessation of soil disturbing activities or prior to the onset of precipitation, whichever occurs first.
If the City Inspector finds the contractor is not in compliance with the SWPPP or any other applicable pollution control laws or regulations, the City Inspector shall direct the contractor to correct the violation. The Contractor shall immediately take measures to correct the violation or notify the City Engineer in writing why correcting the violation immediately is not possible and provide a timetable by which the violation will be corrected. The City Engineer may accept the timetable, reject it or modify it. Under no circumstances will the contractor submit a timetable that exceeds the duration of construction in the immediate area. If the Contractor fails to correct the identified violation by the date agreed upon or prior to the onset of precipitation, the project shall be in nonconformance with these specifications and subject to the remedies as described in Section “LEGAL RELATIONS AND RESPONSIBILITY”.
Installing, inspecting and maintaining water pollution control practices on areas outside the City of Redlands right of way, not specifically arranged and provided for by the City of Redlands in the execution of this contract, will not be paid for without prior written approval.
No work required by regulatory agencies, and for which the Contractor would request additional compensation from the City, shall be started without prior approval from the City Engineer.
PART 4 - MAINTENANCE
To ensure the proper implementation and correct functioning of water pollution control devices and practices, the Contractor shall assign a Qualified SWPPP Practitioner (QSP) to regularly inspect and maintain the construction site’s water pollution control devices and practices as identified in the SWPPP. The frequency of the inspections shall be in accordance with the SWPPP. In the event of multiple consecutive violations, the City Engineer may increase the frequency of the inspections. These additional inspections shall be at the Contractor’s expense based on the current adopted resolution establishing such fees.
The QSP/Contractor shall document the inspections findings, using photographs and a written narrative, and if necessary, make the necessary corrections to the water pollution control practices or devices. One copy of each site inspection record shall be submitted to the City Engineer within 5 working days of completing the inspection. The QSP/Contractor shall submit one copy of each Rain Event Action Plans (REAP), when required, within 12 hours of anticipated precipitation event. The QSP/Contractor shall also submit one copy of each monitoring/sampling report, when required, within 24 hours of receiving the results. The contractor shall be responsible for all expenses incurred in the reporting process.
Redlands Regular Meeting of 06-20-2023 1185 of 1523
STORMWATER POLLUTION PREVENTION PLAN 01571-4
PART 5 - REPORTING REQUIREMENTS - DISCHARGE
If the Contractor identifies discharges leaving the construction site or flowing into drainage systems or surface waters in a manner causing, or potentially causing, a condition of pollution, or if the project receives a written notice or order from a regulatory agency, the Contractor shall immediately inform the City Engineer. The Contractor shall submit a written report to the City Engineer in less than 24 hours of the discharge event, notice, or order. The report shall include the following information:
A. The date, time, location, nature of the operation, and type of discharge, including the cause or type of the notice or order Contractor received.
B. The water pollution control practices deployed before the discharge event, or prior to receiving the notice or order.
C. The date of deployment and type of water pollution control practices deployed after the discharge event, or after receiving the notice or order, including additional measures installed or planned to reduce or prevent reoccurrence.
D. An implementation and maintenance schedule for affected water pollution control practices.
The contractor shall also submit any reports required by the SWPPP or the General Permit for Storm Water Discharges associated with Construction and Land Disturbance Activities to the appropriate agencies. The contractor shall be responsible for all expenses incurred in the reporting process. Any required sampling shall be done by the contractor or his QSP in compliance with the SWPPP.
PART 6 - REPORTING REQUIREMENTS – ANNUAL REPORT and NOTICE OF
TERMINATION
The contractor shall be responsible for preparing the Annual Report. The Annual report shall be prepared per Section XVI. ANNUAL REPORTING REQUIREMENTS of the General Permit for Storm Water Discharges associated with Construction and Land Disturbance Activities, under the California State Water Resources Control Board. Order No. 2009-0009-DWQ, CAS000002. The Annual Report must be prepared by or under the direction of a QSP. 1) The contractor or QSP shall prepare an Annual Report no later than August 15th of each year.
2) The contractor or QSP shall certify each Annual Report in accordance with the Special Provisions.
3) The contractor or QSP shall retain an electronic or paper copy of each Annual Report for a minimum of three years after the date the annual report is filed.
Redlands Regular Meeting of 06-20-2023 1186 of 1523
STORMWATER POLLUTION PREVENTION PLAN 01571-5
4) The contractor or QSP shall include storm water monitoring information in the Annual Report consisting of:
a) A summary and evaluation of all sampling and analysis results, including copies of laboratory reports;
b) The analytical method(s), method reporting unit(s), and method detection limit(s) of each analytical parameter (analytical results that are less than the method detection limit shall be reported as "less than the method detection limit"); c) A summary of all corrective actions taken during the compliance year; d) Identification of any compliance activities or corrective actions that were not implemented;
e) A summary of all violations of the General Permit;
f) The names of individual(s) who performed the facility inspections, sampling, visual observation (inspections), and/or measurements;
g) The date, place, time of facility inspections, sampling, visual observation (inspections), and/or measurements, including precipitation (rain gauge); and h) The visual observation and sample collection exception records and reports specified in Attachments C, D, and E.
5) The contractor or QSP shall provide training information in the Annual Report consisting of:
a) Documentation of all training for individuals responsible for all activities associated with compliance with this General Permit; 2009-0009-DWQ 40 September 02, 2009 Order 2009-0009-DWQ 41 September 02, 2009
b) Documentation of all training for individuals responsible for BMP installation, inspection, maintenance, and repair; and
c) Documentation of all training for individuals responsible for overseeing, revising, and amending the SWPPP.
A copy of the Annual Report shall be submitted to the City no later than 9 A.M. each August 15th. In the event August 15th is a Friday, Saturday, or Sunday, the report shall be submitted no later than 5 P.M. on the Thursday prior to August 15th. If the project is completed prior to August 1st, regardless of when the project started, the Annual Report is due within two weeks of project completion. The contractor shall submit two hard copies of the annual report and one digital copy in PDF format on compact disc (CD).
Redlands Regular Meeting of 06-20-2023 1187 of 1523
STORMWATER POLLUTION PREVENTION PLAN 01571-6
Failure to submit the Annual report within the timeframes specified will result in progress payments and/or retention release being delayed and/or withheld. The City of Redlands, at its discretion, may complete the annual report based on records provided by the contractor. The contractor shall reimburse the city the full cost of creating the Annual Report along with an administrative fee not to exceed 1.7 times the total cost. The contractor shall also be liable for any fines or judgments levied by the Regional Water Quality Control Board against the City of Redlands as a result of the contractors failure to provide the annual report within the time frames listed above.
Under no circumstances does the submittal of a copy of the Annual Report to the City of Redlands relieve the contractor of his responsibility to maintain the Annual Report records for a minimum of three years after the date of submittal.
The contractor shall be responsible for preparing the Notice of Termination. The Notice of Termination shall be prepared within 30 days of the cessation of construction and shall meet all the requirements of the General Permit for Storm Water Discharges associated with Construction and Land Disturbance Activities, under the California State Water Resources Control Board.
Order No. 2009-0009-DWQ, CAS000002. The Notice of Termination must be prepared by or under the direction of a QSP.
Along with submitting the Notice of Termination to the City of Redlands, the QSP shall submit one (1) hard copy and one (1) electronic copy of the Storm Water Pollution Prevention Plan (SWPPP), including all inspection reports, photographs and other documents as required by the General Permit for Storm Water Discharges associated with Construction and Land Disturbance Activities, under the California State Water Resources Control Board. Order No. 2009-0009- DWQ, CAS000002, to the Engineer.
PART 7 - WATER POLLUTION BEST MANAGEMENT PLAN (BMP) BUDGET The Contractor shall submit a completed Water Pollution BMP budget, which itemizes the BMPs for water pollution control work. The Contractor shall identify items, quantities, and values for all water pollution control work. The Water Pollution BMP budget shall provide a cost breakdown for the water pollution control work based on BMP quantity, unit cost, and total amount.
The Contractor shall be responsible for the accuracy of the quantities and values used in the Water Pollution BMP budget. Partial payment for the item of water pollution control will not be made until the Water Pollution BMP budget is approved by the Engineer. Overhead and profit, except for time-related overhead, shall be included in the individual line items listed in the Water Pollution BMP budget. Line item quantities indicated in the Water pollution BMP budget in this section shall be considered project-specific minimums. All the BMPs listed in the Water Pollution Control BMP budget can be referenced in the CASQA Construction BMP Handbook.
PART 8 - PAYMENTS AND PENALTIES
Redlands Regular Meeting of 06-20-2023 1188 of 1523
STORMWATER POLLUTION PREVENTION PLAN 01571-7
The Water Pollution BMP budget shall include full compensation for furnishing labor, materials, tools, equipment and incidentals for doing all the work involved in reviewing, updating, and implementing a Storm Water Pollution Prevention Plan, including installing, constructing, removing and disposing of water pollution control devices and practices, and non-stormwater management and waste management and no additional compensation will be allowed, unless there is a separate prior approval in writing by the City Engineer.
It shall be understood that the City of Redlands and/or the City Engineer’s acceptances does not relieve the Contractor of his/her full responsibility, legally and/or financially, to repair damages resulting from inadequacy and/or insufficiency of water pollution control devices and practices that were installed by the Contractor during construction activity.
PART 9 - LEGAL RELATIONS AND RESPONSIBILITY
The City Inspector may use any of the following measures if violations are not corrected in a timely manner or if the violation may present a danger to public health or to the environment; notices of correction or violation, stop work orders, citations, and using City staff or third party contractors to correct the problem. In the event that the above measures do not resolve the issues, the City Inspector shall inform the State Water Resources Control Board (SWRCB) of the violation and request their intervention.
The Contractor shall be solely responsible for penalties assessed or levied on the Contractor or the City of Redlands as a result of the Contractor’s failure to comply with the provisions in this section, including but not limited to, compliance with the applicable provisions of the Permits, the Manuals, and Federal, State and local regulations and requirements as set forth, therein.
Penalties shall also include payment made or cost incurred in settlement for alleged violations of the Permits, the Manuals, or applicable laws, regulations or requirements, Costs incurred could include sums spent instead of penalties, in mitigation or to remediate or correct violations. This shall apply regardless of the source issuing the penalties.
In the event a stop work order has been issued, the days passing between the discovery of the violation until the violation has been resolved and the stop work order has been lifted, shall be considered “working” days and shall not negate any claims by the City of Redlands for liquidated damages.
If the Contractor fails to correct violations immediately or within the time table established with the City Engineer, the City of Redlands may elect to use City staff or a third party to bring the project into compliance. The Contractor shall be responsible for the cost incurred by the City of Redlands when using City staff or a third party to bring the project into compliance. The City of Redlands reserves the right to add an additional fifteen (15) percent to the costs to cover administrative expenses.
PART 10 - RETENTION OF FUNDS
Redlands Regular Meeting of 06-20-2023 1189 of 1523
STORMWATER POLLUTION PREVENTION PLAN 01571-8
Notwithstanding any other remedies authorized by law, the City of Redlands may retain money due the Contractor under the contract, in an amount determined by the City, up to and including the entire amount of penalties proposed, assessed or levied as result of the Contractor’s violation of the Permits, the Manuals, or Federal or State law, regulations or requirements. Funds may be retained by the City until final disposition has been made as to the Penalties. The Contractor shall remain liable for the full amount of penalties until such time as they are resolved with the entity seeking the penalties.
When a regulatory agency or third party identifies a failure to comply with the Permits and modifications, thereto, the Manuals, or other Federal, State or local requirements, the City of Redlands may retain money due to the Contractor, subject to the following:
A. The amounts retained, due to Contractor’s failure to conform to the provisions in this section, will be released for payment on the next monthly estimate for partial payment providing the corrections have been implemented and maintained and when water pollution has been adequately controlled, as determined by the City Engineer.
During the estimated period that the Contractor fails to conform to the provisions in this section, the City may retain an amount equal to 25 percent of the estimated value for the contract work performed.
PART 11 - QUALIFIED SWPPP PRACTITIONER (QSP)
The General Construction Permit requires a Qualified SWPPP Practitioner (QSP) to oversee implementation of the BMPs and to ensure proper project oversight. Any contractors bidding and/or awarded a contract for any projects for the City of Redlands subject to the provisions of the General Permit shall employ a QSP. Prior to being awarded a construction contract, the successful bidder shall submit the name of the QSP to the City or Redlands for approval.
The QSP shall be responsible for the elimination of all unauthorized discharges and the preparation and submittal of an annual compliance evaluation report.
END OF SECTION
Redlands Regular Meeting of 06-20-2023 1190 of 1523
CONSTRUCTION INFORMATION SIGNS 01581-1
SECTION 01581 CONSTRUCTION INFORMATION SIGNS
1.1 THE REQUIREMENT
The City shall provide the Contractor with all required construction information signs for the project. The signs shall be installed at the locations noted in the plans, if included, or as otherwise directed by the Engineer. If the project consists of numerous sites, the construction information signs shall be relocated to each site as work progresses. The construction signs shall be installed the same day work commences on any construction site. If the sign is not installed prior to construction work beginning at a subsequent site, the City will install the information signs at the Contractor’s expense.
The installation of each sign shall be the responsibility of the contractor to include mounting posts, hardware and any related incidentals to ensure the sign is placed in a safe and secure manner. For any sign required for multiple site projects, where the sign is frequently relocated and not anticipated to be installed in the ground on posts, the Contractor shall provide a Type III barricade for mounting. The contractor shall obtain approval from the Engineer following installation of the construction information sign. If the signs are installed in the ground with posts, proper vertical clearance shall be provided. The minimum vertical clearance shall be six feet within a parkway area and seven feet within the sidewalk.
The construction information sign shall remain visible at all times. The contractor shall replace stolen signs at their expense and maintain the signs, ensuring all graffiti, soil, paint, etc. is removed from the sign immediately. Upon completion of the project, each sign shall be removed and returned to the City. If the sign is not returned to the City at the completion of the project in the original condition, the cost of the sign shall be withheld from the final progress payment.
The Contractor shall notify Underground Service Alert (Dig alert) at least 2 working days, but not more than 14 calendar days, prior to performing any excavation.
Full compensation for furnishing all labor, equipment, materials, and tools required to perform the tasks noted above, and as ordered by the Engineer, shall be considered as being included in the various Contract items of work and no separate or additional compensation will be allowed therefore.
END OF SECTION
Redlands Regular Meeting of 06-20-2023 1191 of 1523
THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 06-20-2023 1192 of 1523
MOBILIZATION 01721-1
SECTION 01721 MOBILIZATION
1.1 THE REQUIREMENT
A. General
Whether Mobilization is included as a Contract Bid Item in the Bid Proposal Form or specified as part of the lump sum in the Contract Documents, the cost of labor, equipment, materials and incidentals for doing all the work in mobilization (in advance of construction operations and not directly attributable to any specific bid item) shall be included in the Contract Price Breakdown and progress payment estimate. If there is no mobilization bid item the CONTRACTOR shall submit to the INSPECTOR for approval the Contract Price Breakdown with the amount established for mobilization.
Mobilization shall include, but not be limited to, the following items, all as required for the proper performance and completion of the Work:
1. Obtaining all permits, licenses, insurance, and bonds. Providing copies to the ENGINEER.
2. Moving onto the Jobsite all of CONTRACTOR’S plant and equipment as required.
3. Erecting temporary buildings and other construction facilities.
4. Installing temporary construction power and wiring.
5. Establishing fire protection system for its temporary facilities.
6. Developing construction water supply.
7. Providing field office trailers for the CONTRACTOR, complete with all specified equipment, furnishings, utility services and required approvals from the CITY.
8. Providing sanitary facilities or connecting to onsite sanitary facilities as specified.
9. Providing for potable water facilities as specified. This includes a means by which all on site CONTRACTOR, Subcontractor or supplier personnel can wash their hands with soap.
10. Arranging for, and erection of, CONTRACTOR’S work and storage yards and sheds.
Redlands Regular Meeting of 06-20-2023 1193 of 1523
MOBILIZATION 01721-2
11. Submitting all required Subcontractor insurance certificates and bonds.
12. Posting all CAL/OSHA required notices and establishment of safety programs.
13. Furnishing of Construction Schedule, Contract Price Breakdown and Submittal Schedules.
14. Erecting all temporary fencing, including removal and disposal of existing temporary fencing.
END OF SECTION
Redlands Regular Meeting of 06-20-2023 1194 of 1523
SURVEYING 01722-1
SECTION 01722 SURVEYING
PART 1 - GENERAL
A. General
1. The CONTRACTOR shall be responsible for all surveys required to layout the Work and for the accuracy of all survey work for construction.
The CONTRACTOR shall include the cost of all such survey work in their Bid. The CONTRACTOR shall have all construction surveying performed by a `Licensed Land Surveyor' or a `Civil Engineer’ registered by the State of California to perform such work. The ENGINEER reserves the right to verify all survey work done by the CONTRACTOR.
2. The CONTRACTOR shall preserve the initial survey control points for the duration of their usefulness. Monumentation that is subject to disturbance or destruction shall be located and referenced prior to construction and relocated and referenced if necessary after construction, in accordance with the following requirements.
B. Construction Surveys
1. The CONTRACTOR shall provide all reference stakes and form checks necessary for construction and inspection of improvements. All construction staking shall be documented in cut sheets and provided to the ENGINEER. This staking may include but is not limited to: removals, joins, rough grade, slope, utilities, storm drains, sewers, curbs, walks, paving, wall and building stakes; and any other staking necessary for construction and inspection.
C. Reference Or Grade Stakes
1. A reference or grade stake shall be set for each grade change or angle point shown on the plan, standard plan, and shop drawing, in addition to the normal staking interval.
D. Form Checks
1. Forms shall be checked when durable points may be disturbed, removed, or are impractical to be used to verify the design location. The measured location shall be recorded in the survey field notes. All variations from the plan location shall be brought to the attention of the ENGINEER.
E. Staking Intervals And Offset Stake Lines
Redlands Regular Meeting of 06-20-2023 1195 of 1523
SURVEYING 01722-2
1. All staking intervals shall be in accordance as directed by the Engineer.
Stake lines shall be set at an offset distance from the improvement to ensure proper grade, station, and alignment.
F. Utility Stakes
1. The CONTRACTOR shall provide stakes for all utilities, public or private, that require location or relocation, unless otherwise stated.
G. Additional Survey Work
1. The CONTRACTOR may be required to furnish additional survey work, such as profiles, restakes, Change Orders, etc., at the request of the ENGINEER or the INSPECTOR.
H. Accuracy
1. The CONTRACTOR shall use appropriate surveying methods to obtain the following standards: For fixed works (i.e. cast-in-place concrete; asphalt pavement, pipes and drains; and other items determined by the ENGINEER) the following survey standards shall be used. The absolute horizontal accuracy, in relationship to the Engineer’s control, shall be such that the semimajor axis of its 95% error ellipse is ±0.015 foot or less. The absolute vertical accuracy, in relationship to the Engineer’s control, shall be such that its standard deviation is ±0.015 foot or less. The relative horizontal accuracy of survey points within the Project shall be such that the semimajor axis of its 95% error ellipse is ±0.015 foot or less. The relative vertical accuracy of survey points within the Project shall be such that its standard deviation is ±0.015 foot or less.
2. For excavation purposes, the following survey standards shall be used.
The absolute horizontal accuracy, in relationship to the Engineer’s control, shall be such that the semimajor axis of its 95% error ellipse is ±0.1 foot or less. The absolute vertical accuracy, in relationship to the Engineer’s control, shall be such that its standard deviation is ±0.1 foot or less. The relative horizontal accuracy of survey points within the Project shall be such that semimajor axis of the 95% error ellipse is ±0.1 foot or less. The relative vertical accuracy of survey points within the Project shall be such that its standard deviation is ±0.1 foot or less.
I. Survey/Inspector
1. The CONTRACTOR shall provide to the INSPECTOR those
measurements and control points necessary to determine the location and conformance to the plan, line, and grade of the improvements necessary for inspection purposes.
Redlands Regular Meeting of 06-20-2023 1196 of 1523
SURVEYING 01722-3
J. Survey Notes
1. The CONTRACTOR shall supply and keep notes on CITY standard format note sheets. The ENGINEER may request copies of, and otherwise review, survey notes at any time during the construction phase of the Project. Upon completion of the Project, the original survey notes shall become the property of the CITY and shall be delivered to the
ENGINEER
PART 2 – MONUMENT PRESERVATION GUIDELINES
A. New & Reconstruction Projects
1. Prior to Construction
a. The public survey records are to be researched for the location of all possible survey monuments within the scope of the project and copies shall be furnished to the survey crew.
b. The survey crew shall diligently search for all survey monuments of record above or below the surface, within the road right-of-way. It is suggested that this search would include the use of a metal detector. When the detector indicates the possibility of a buried survey monument, then digging below the surface to uncover the monument is required.
c. The survey crew shall properly reference all found survey monuments, which may be disturbed or covered during construction, to stable surface points. d. The authorized surveyor shall properly complete a Corner Record or Record of Survey for the monuments noted in item c, above. Prior to the start of any construction work, the original or a print of the Corner Record or Record of Survey shall be submitted to the County Surveyor for review, signature and filing. A copy shall also be provided to the City prior to the start of construction to provide documentation that the requirement is met.
2. After Construction and Prior to Notice of Completion a. All covered and disturbed monuments shall be reset with the same or more durable type of monument as the original, in the surface of the construction.
Key monuments shall be a minimum 1” inside diameter iron pipe of appropriate length.
b. A monument box or other protective structure is recommended to be placed around key monuments (section corners, quarter section corners). c. The authorized surveyor shall properly completes a Corner Record or Record of Survey for all set monuments with a change in character, including tag number, and submit it to the County Surveyor for review, signature and filing.
A copy shall also be provided to the City prior to the Notice of Completion to provide documentation that the requirement is met.
Redlands Regular Meeting of 06-20-2023 1197 of 1523
SURVEYING 01722-4
B. Overlay Projects
1. Prior To Construction
a. The public survey records are to be researched for the location of all possible survey monuments within the scope of the project and copies shall be furnished to the survey crew.
b. The survey crew shall diligently search for all survey monuments of record and on the surface of the road. It is suggested the search would include the use of a metal detector. When the detector indicates the possibility of a buried survey monument, then digging below the surface to uncover the monument within 2” of the road surface is recommended.
c. The survey crew shall properly reference found survey monuments, which may be disturbed or covered during construction, to stable surface points. d. The authorized surveyor shall properly complete a Corner Record or Record of Survey for the monuments noted in item 3, above. Prior to the start of any construction work, the original or a print of the Corner Record or Record of Survey shall be submitted to the County Surveyor for review, signature and filing. A copy shall also be provided to the City prior to the start of construction to provide documentation that the requirement is met.
2. After Construction and Prior to Notice of Completion a. All covered or disturbed monuments and surface monuments are reset in the new road surface, or a new monument is set in the new road surface above the buried one.
b. All existing monument boxes will be adjusted to grade or replaced, as appropriate.
c. A monument box or other protective structure should be placed around key monuments (section corners, quarter section corners).
d. The authorized surveyor shall properly complete a Corner Record or Record of Survey for all set monuments and existing monuments with a change in character, including tag number and submits it to the County Surveyor for review, signature and filing. A copy shall also be provided to the City prior to the Notice of Completion to provide documentation that the requirement is met.
C. Slurry Seal Projects
1. Prior To Construction
a. The public survey records are to be researched for the location of all possible survey monuments within the scope of the project and copies furnished to for the survey crew.
Redlands Regular Meeting of 06-20-2023 1198 of 1523
SURVEYING 01722-5
b. All monument boxes shall be located and steps taken to ensure that the survey monuments inside are readily accessible upon completion of the project. c. The survey crew shall diligently searches for survey monuments on the surface of the roadway, and identify said monuments recovered in the field to ensure that they will be protected. The survey crew shall inventory the monuments recovered in the field in a manner that allows for their recovery and inspection after construction.
2. After Construction and Prior to Notice of Completion a. All monument boxes shall be inspected, and appropriate action taken when needed, to ensure that the survey monuments inside are readily accessible. b. The survey crew shall review the inventory of found monuments by field inspection to ensure that all survey monuments are clean and exposed. Those monuments covered after construction is completed shall be uncovered.
D. Monument Tie Preservation
1. Prior To Construction
a. All existing survey monument ties within the scope of the project shall be researched and identified prior to construction. Surveyor may obtain existing tie sheets from the City as available.
b. If it is determined that all ties for a survey monument may be disturbed during construction, the Surveyor shall relocate the monument ties prior to construction, within improvements that will not be disturbed, and file the revised tie sheet with the City. A minimum of three tie points should reference each centerline monument, whenever possible
2. After Construction and Prior to Notice of Completion a. If it is determined that the result of construction will not disturb all survey monument ties for a specific monument, the Surveyor shall replace all monument ties disturbed during construction per the following guidelines:
i. Monument ties shall be placed during the finishing process of the concrete improvements.
ii. Monument ties shall be set below the elevation of the adjacent top of curb to provide protection from any future cleaning, maintenance or work around the tie.
iii. A minimum of three tie points should reference each centerline monument, whenever possible.
b. Once the construction is complete, the Surveyor shall prepare a revised tie sheet, and file with the City for all monument ties disturbed during the construction.
END OF SECTION
Redlands Regular Meeting of 06-20-2023 1199 of 1523
THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 06-20-2023 1200 of 1523
POTHOLING 01732-1
SECTION 01732 POTHOLING
1.1 THE REQUIREMENT
A. The CONTRACTOR shall conduct exploratory excavations by potholing to verify or to discover the actual locations and the size of existing underground utilities and improvements. The CONTRACTOR shall take care not to damage existing facilities during potholing operations. Any utility or existing facility (including those located by Underground Service Alert - USA) within 3 feet of any trench or excavation shall be potholed prior to starting the contract work in the vicinity.
Potholing shall be done in each given area where excavation work is to occur at least fourteen (14) calendar days in advance of any excavation or construction in that area, to avoid possible delay in the progress of the Work.
B. Potholing shall consist of excavations at the locations of utilities or other underground facilities indicated on the Drawings, located by USA, or as directed by the ENGINEER. All costs of potholing operations for the utilities indicated on the Drawings shall be included in the CONTRACTOR’S Bid.
C. If an allowance for “Additional Potholing” has been established and included in the SCHEDULE OF WORK AND PRICES, this allowance shall only be used to reimburse the CONTRACTOR for potholing utilities not shown or otherwise referenced on the drawings, or as directed by the ENGINEER. If the total cost of the Work directed under the Additional Potholing allowance differ from the amount set forth in the SCHEDULE OF WORK AND PRICES, the Contract Price shall be adjusted by a Change Order. The adjustment shall be the difference between the total actual costs and the amount included in the Bid, as an additional amount due to the CONTRACTOR or a credit to the CITY, as appropriate.
D. In addition to the potholes indicated on the Drawings, or directed by the ENGINEER, the CONTRACTOR may opt to do further potholing deemed necessary at no additional cost to the CITY.
E. Potholing operations shall conform to all applicable requirements as to sidewall slopes, sheeting and shoring, and all other excavation and trenching provisions specified herein.
F. Potholes shall be identified and protected in accordance with the Engineer’s instructions, the California Manual on Uniform Traffic Control Devices (MUTCD) and Work Area Traffic Control Handbook (WATCH) Standards.
G. The CONTRACTOR’S proposed method of potholing and schedule for potholing shall be submitted to the ENGINEER for approval, at least thirty (30) days prior to the commencement of operation. Any utilities damaged during potholing shall be immediately reported to the ENGINEER and INSPECTOR and repairs made immediately in accordance with the specifications.
Redlands Regular Meeting of 06-20-2023 1201 of 1523
POTHOLING 01732-2
H. A complete log of all potholes shall be kept by the CONTRACTOR, showing specific locations and dimensions of trenches. The log shall be verified by the INSPECTOR prior to the backfilling of the potholes. The verified log will be submitted to the ENGINEER and the INSPECTOR within two (2) working days after completion of potholing in each area. Payment for potholing utilities not shown or otherwise referenced on the drawings, or as directed by the ENGINEER will not be made unless these potholes are listed on the verified log.
I. The CONTRACTOR shall record the coordinates, elevations and dimensions of all utilities and improvements verified or discovered by potholing. The records shall be submitted to the ENGINEER within two (2) working days after the completion of potholing in each area. The records shall also include dates of the potholing operations and any additional discovered information or pertinent data.
J. Upon completion of potholing in each area, and after verification of the logs by the INSPECTOR, potholes shall be immediately backfilled and compacted in accordance with the specifications, or restored as directed by the ENGINEER.
END OF SECTION
Redlands Regular Meeting of 06-20-2023 1202 of 1523
DEMOBILIZATION 01740-1
SECTION 01740 DEMOBILIZATION
1.1 THE REQUIREMENT
A. General
Whether Demobilization is included as a Contract Bid Item in the Bid Proposal Form or specified as part of the lump sum in the Contract Documents, the cost of labor, equipment, materials and incidentals for doing all the work in demobilization (upon completion of all contract work and not directly attributable to any specific bid item) shall be included in the Contract Price Breakdown and progress payment estimate. If there is no demobilization bid item the CONTRACTOR shall submit to the INSPECTOR for approval the Contract Price Breakdown with the amount established for demobilization.
Demobilization shall include, but not be limited to, the following items, all as required for the proper performance and completion of the Work:
1. Moving off of the Jobsite all of CONTRACTOR’S plant and equipment as required.
2. Dismantling and removing all temporary buildings and other construction facilities.
3. Dismantling and removing all temporary construction power and wiring.
4. Removing all sanitary facilities from the work site.
5. Remove all waste, debris, and rubbish caused by construction operations within the work area, adjacent properties and public roads.
6. Materials and equipment shall be removed from the site as soon as they are no longer necessary. Before the final inspection, the site shall be cleared of equipment, unused materials and rubbish so as to present a satisfactory clean and neat appearance. All cleanup costs shall be included in the CONTRACTOR’S Bid.
7. Dismantling and removal of all temporary fencing.
8. Provide City with all required As-Built drawings.
9. All required Corner Records have been filed with the County and all copies provided to the City per Section 01722 Surveying.
10. All items noted within the final inspection (“Punchlist”) have been completed to the satisfaction of the City.
Redlands Regular Meeting of 06-20-2023 1203 of 1523
DEMOBILIZATION 01740-2
11. All project photographs as required within Section 01322 Construction Progress Photography have been provided.
12. Notice of Completion (NOC) will not be filed until all work is complete per this Section 01740.
END OF SECTION
Redlands Regular Meeting of 06-20-2023 1204 of 1523
TECHNICAL SPECIFICATIONS
Redlands Regular Meeting of 06-20-2023 1205 of 1523
THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 06-20-2023 1206 of 1523
PROTECTING EXISTING UNDERGROUND UTILITIES 02222-1
SECTION 02222 PROTECTING EXISTING UNDERGROUND UTILITIES PART 1 - GENERAL
A. Description
This section includes materials and procedures for protecting existing underground utilities.
B. Related Work Specified Elsewhere
1. General Conditions
PART 2 - MATERIALS
A. Replacement in Kind
Except as indicated below or as specifically authorized by the Owner's Representative, reconstruct utilities with new material of the same size, type, and quality as that removed.
B. Vitrified Clay Sewer Pipe and Couplings
For sewer pipe 8 inches in diameter or under, replacement shall consist of plain-end pipe conforming to ASTM C 700. Compression couplings shall conform to ASTM C 594, band seal couplings or equal. Use at least two lengths of pipe in crossing the trench section as shown on the details in the drawings.
PART 3 - EXECUTION
A. General
1. Replace in kind street improvements, such as curbs and gutters, barricades, traffic islands, signalization, fences, signs, etc., that are cut, removed, damaged, or otherwise disturbed by the construction.
2. Where utilities are parallel to or cross the construction but do not conflict with the permanent work to be constructed, follow the procedures given below and as indicated in the drawings. Notify the utility owner 48 hours in advance of the crossing construction and coordinate the construction schedule with the utility owner's requirements. For utility crossings not shown in the drawings, refer to the General Conditions and the instructions of the Owner's Representative for guidance.
Redlands Regular Meeting of 06-20-2023 1207 of 1523
PROTECTING EXISTING UNDERGROUND UTILITIES 02222-2
3. Determine the true location and depth of utilities and service connections which may be affected by or affect the work. Determine the type, material, and condition of these utilities. In order to provide sufficient lead time to resolve unforeseen conflicts, order materials and take appropriate measures to ensure that there is no delay in work.
4. Expose utilities 1,300 feet in advance of the pipeline construction.
B. Procedures
1. Protect in Place: Protect utilities in place, unless abandoned, and maintain the utility in service, unless otherwise specified in the drawings or in the specifications.
2. Cut and Plug Ends: Cut abandoned utility lines and plug the ends. Plug storm drains and sewers with an 8-inch wall of brick and mortar. Cap waterlines with a cast-iron cap or install a 3-foot-long concrete plug. Dispose of the cut pipe as unsuitable material.
3. Remove and Reconstruct: Where so indicated in the drawings or as required by the Owner's Representative, remove the utility and, after passage, reconstruct it with new materials. Provide temporary service for the disconnected utility.
C. Compaction
1. Utilities Protected in Place: Backfill and compact under and around the utility so that no voids are left.
2. Utilities Reconstructed: Prior to replacement of the utility, backfill the trench and compact to an elevation 1 foot above the top of the ends of the utility. Excavate a cross trench of the proper width for the utility and lay, backfill, and compact.
3. Alternative Construction--Sand Slurry: Sand slurry consisting of one sack (94 pounds) of portland cement per cubic yard of sand and sufficient moisture for workability may be substituted for other backfill materials to aid in reducing compaction difficulties. Submit specific methods and procedures for the review of the Owner's Representative prior to construction.
4. The protection of the utility during construction.
D. Thrust Blocks on Waterlines
Note that restrained joints is the required method of controlling thrust restraint on this project except where shown on the plans or as approved otherwise by the City of Redlands.
1. The Contractor's attention is called to thrust blocks delineated in the drawings for waterlines throughout the project whose thrust is in the direction of the new excavation and, therefore, may be affected by the construction. These waterlines are Redlands Regular Meeting of 06-20-2023 1208 of 1523
PROTECTING EXISTING UNDERGROUND UTILITIES 02222-3
owned and operated by the Owner. Protect thrust blocks in place or shore to resist the thrust by a means approved by the Owner and reconstruct. If the thrust blocks are exposed or rendered to be ineffective in the opinion of the Owner's Representative, reconstruct them to bear against firm unexcavated or backfill material.
2. Provide firm support by backfilling that portion of the trench for a distance of 2 feet on each side of the thrust block to be reconstructed from the pipe bedding to the pavement subgrade, with either:
a. Sand-cement slurry (94 pounds of cement per cubic yard). b. The native material compacted to a relative compaction of 95%.
3. Then excavate the backfill material for construction of the thrust block.
4. Test compaction of the backfill material before pouring any concrete thrust block.
Use Class 560-C-3250 concrete for reconstruction.
E. Adjacent Parallel Utilities
1. The Contractor's attention is called to utilities throughout the project that are parallel to the proposed utility.
2. The position of these utilities is just outside the new construction. Protect these utilities from any disturbances and repair the lines and associated vaults and appurtenances if they are damaged in any way. All costs incurred for protection of these lines or any costs incurred due to the presence of the lines, whether or not they lie within the new construction, shall be borne in full by the Contractor.
END OF SECTION
Redlands Regular Meeting of 06-20-2023 1209 of 1523
THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 06-20-2023 1210 of 1523
CURED-IN-PLACE PIPE 02766-1
SECTION 02766 CURED-IN-PLACE PIPE (CIPP)
PART 1 - GENERAL
A. Description
It is the intent of this specification to provide for the reconstruction of pipelines and conduits by the installation of a resin-impregnated flexible tube, which is tightly formed to the original conduit. The resin is cured using either hot water under hydrostatic pressure or steam pressure within the tube. The Cured-In-Place Pipe (CIPP) will be continuous and tight fitting with a 50 year design life.
B. References
This specification references standards from the American Society for Testing and Materials, such as:
1. ASTM F1216 (Rehabilitation of Existing Pipelines and Conduits by the Inversion and Curing of a Resin-Impregnated Tube),
2. ASTM F1743 (Rehabilitation of Existing Pipelines and Conduits by Pulled-in-Place Installation of Cured-in-Place Thermosetting Resin Pipe (CIPP)),
3. ASTM D5813 (Cured-in-Place Thermosetting Resin Sewer Pipe),
4. ASTM D790 (Test Methods for Flexural Properties of Un-reinforced and Reinforced Plastics and Electrical Insulating Materials),
5. D2990 (Tensile, Compressive, and Flexural Creep and Creep-Rupture of Plastics) These specifications are made a part hereof by such reference and shall be the latest edition and revision thereof. In case of conflicting requirements between this specification and these referenced documents, this specification will govern.
C. Submittals
1. Submit shop drawings in accordance with Section 01330.
2. Submit certificate of compliance with referenced standards (e.g., AWWA, ANSI, ASTM, etc.).
3. Submit the source of materials for the specified liner pipe.
4. Quality Control Reports – The manufacturer’s results of quality control tests performed on actual material used. The reports shall contain all the raw data and intermediate calculations, as well as the testing procedures.
Redlands Regular Meeting of 06-20-2023 1211 of 1523
CURED-IN-PLACE PIPE 02766-2
5. Installation Manual from manufacturer for proposed product.
6. Material Safety Data Sheet (MSDS) for all products proposed.
7. Data, measurements, assumptions and calculations for each different liner design proposed within the project.
8. Installation Plan showing the specific installation sequence, including schedule of each segment, cleaning, shutdown, curing, cool down, installation and service reinstatement. Plan shall be maintained on the jobsite at all times.
9. Quality Control Plan including the following:
A. A detailed discussion of the proposed quality controls to be performed by the Contractor.
B. Define the Contractor’s personnel roles and responsibilities. Contractor shall assign specific personnel responsible for ensuring that all requirements, for this contract are met.
C. Define procedures for quality control, product sampling and testing.
D. Define procedures for product performance controls in both raw materials and the cured product.
10. Resident Notification Plan in accordance with Section 7-19 of the General Conditions.
PART 2 - MATERIALS
A. Tube
1. The sewn Tube shall consist of one or more layers of absorbent non-woven felt fabric and meet the requirements of ASTM F1216, Section 5.1 or ASTM F1743, Section 5.2.1 or ASTM D 5813, Sections 5 and 6. The tube shall be constructed to withstand installation pressures, have sufficient strength to bridge missing pipe, and stretch to fit irregular pipe sections.
2. The wet out Tube shall have a relatively uniform thickness that when compressed at installation pressures will equal or exceed the calculated minimum design CIPP wall thickness.
3. The Tube shall be manufactured to a size that when installed will tightly fit the internal circumference and length of the original pipe. Allowance should be made for circumferential stretching during installation.
Redlands Regular Meeting of 06-20-2023 1212 of 1523
CURED-IN-PLACE PIPE 02766-3
4. The outside layer of the Tube shall be coated with an impermeable, flexible membrane that will contain the resin and allow the resin impregnation (wet out) procedure to be monitored.
5. The Tube shall contain no intermediate or encapsulated elastomeric layers. No material shall be included in the Tube that may cause delamination in the cured CIPP. No dry or unsaturated layers shall be evident.
6. The wall color of the interior pipe surface of CIPP after installation shall be a relatively light reflective color so that a clear detailed examination with closed circuit television inspection equipment may be made.
7. Seams in the Tube shall be stronger than the non-seamed felt material.
8. The Tube shall be marked for distance at regular intervals along its entire length, not to exceed 5 ft. Such markings shall include the Manufacturers name or identifying symbol. The tubes must be manufactured in the USA.
B. Resin
The resin system shall be a corrosion resistant polyester or vinyl ester system including all required catalysts, initiators that when cured within the tube create a composite that satisfies the requirements of ASTM F1216, ASTM D5813 and ASTM F1743, the physical properties herein, and those which are to be utilized in the submitted and approved design of the CIPP for this project. The resin shall produce a CIPP that will comply with the structural and chemical resistance requirements of this specification.
C. Structural Requirements
1. The CIPP shall be designed as per ASTM F1216, Appendix X.1. The CIPP design shall assume no bonding to the original pipe wall and a design life of 50 years.
2. The Contractor must have performed long-term testing for flexural creep of the CIPP pipe material installed by his Company. Such testing results are to be used to determine the long-term, time dependent flexural modulus to be utilized in the product design. This is a performance test of the materials (Tube and Resin) and general workmanship of the installation and curing as defined within the relevant ASTM standard. A percentage of the instantaneous flexural modulus value (as measured by ASTM D790 testing) will be used in design calculations for external buckling. The percentage, or the long-term creep retention value utilized, will be verified by this testing. Retention values exceeding 50% of the short-term test results shall not be applied unless substantiated by qualified third party test data to the Owner’s satisfaction. The materials utilized for the contracted project shall be of a quality equal to or better than the materials used in the long-term test with respect to the initial flexural modulus used in the CIPP design.
3. The Enhancement Factor ‘K’ to be used in ‘Partially Deteriorated’ Design conditions shall be assigned a value of 7.
Redlands Regular Meeting of 06-20-2023 1213 of 1523
CURED-IN-PLACE PIPE 02766-4
4. The layers of the cured CIPP shall be uniformly bonded. It shall not be possible to separate any two layers with a probe or point of a knife blade so that the layers separate cleanly or the probe or knife blade moves freely between the layers. If the layers separate during field sample testing, new samples will be required to be obtained from the installed pipe. Any reoccurrence may cause rejection of the work.
5. The cured pipe material (CIPP) shall conform to the structural properties, as listed below.
MINIMUM CIPP PHYSICAL PROPERTIES
Cured Polyester Composite
Property Test Method min. per ASTM F1216 Enhanced Resin Modulus of
Elasticity ASTM D790 250,000 psi 400,000 psi
Flexural Stress ASTM D790 4,500 psi 4,500 psi
6. The required structural CIPP wall thickness shall be based as a minimum, on the properties in the table above, or greater values if substantiated by independent lab testing and in accordance with the design equations in the Appendix X1. Design Considerations of ASTM F1216, and the following design parameters:
Design Safety Factor = 2.0
Retention Factor for Long-Term Flexural Modulus to be used in Design = 50% - 75% (As determined by long-term tests described in Section 2, and approved by the Owner) Ovality (calculated from (X1.1of ASTM F1216) = 2%
Enhancement Factor, K =See Section 3
Groundwater Depth (above invert of existing pipe) = 0 (ft) Soil Depth (above crown of existing pipe) = See Plans (ft) Soil Modulus = 120 psi
Soil Density = 1000 pcf
Live Load = H20 Highway
Design Condition (partially or fully deteriorated) = FD
7. Any layers of the tube that are not saturated with resin prior to insertion into the existing pipe shall not be included in the structural CIPP wall thickness computation.
Redlands Regular Meeting of 06-20-2023 1214 of 1523
CURED-IN-PLACE PIPE 02766-5
PART 3 - EXECUTION
A. General
Cured-In-Place Pipe (CIPP) for the mainline sewer shall be installed as a one piece liner to reconstruct a section of the mainline sewer without excavation. The liner shall be leak free at the interface between the mainline and liner and at all lateral connections. The tube shall be continuous in length and the wall thickness shall be uniform. The liner shall be capable of conforming to offset joints, bells and disfigured pipe sections.
B. Preparatory Work & Incidental Items
1. It shall be the responsibility of the Contractor to locate and designate all manhole access points for the work.
2. The Contractor shall remove all internal debris out of the sewer line that will interfere with the installation of CIPP. A trap shall be installed downstream of cleaning operations to collect all debris generated. The Contractor shall be responsible for disposal of all debris removed from the line during the cleaning process. Any hazardous waste material encountered during this project will be considered as a changed condition.
3. CCTV videos have been provided for all lines proposed for lining within this project. The Contractor shall review the videos contained within Appendix E and notify the Engineer immediately if any conditions appear unfeasible to install CIPP.
The Contractor shall also review the videos to establish the required amount of cleaning required for each pipeline. There shall be no additional time or compensation for conditions evident on the videos at the time of bid opening.
4. The Contractor shall provide for the flow of sewage around the section or sections of pipe designated for repair. Plugging the line at an existing upstream manhole and pumping the flow into a downstream manhole or adjacent system shall make the bypass. The pump(s) and bypass line(s) shall be of adequate capacity to accommodate the sewage flow.
5. It shall be the responsibility of the Contractor to clear the line of obstructions such as solids and roots that will prevent the insertion of CIPP. If pre-installation inspection reveals an obstruction such as a protruding service connection, dropped joint, or a collapse that will prevent the installation process, that was not evident on the pre-bid video and it cannot be removed by conventional sewer cleaning equipment or in-situ repair equipment, Contractor shall contact the City representative immediately.
6. Perform CCTV inspection after cleaning of the sewer lines, to document the condition of the host pipe, identify and locate any live service laterals, and verify the lines were cleaned in accordance with the lining manufacturer’s requirements.
Redlands Regular Meeting of 06-20-2023 1215 of 1523
CURED-IN-PLACE PIPE 02766-6
7. Inspection of pipelines shall be in accordance with Section 500-1.1.5 performed by experienced personnel trained in locating breaks, obstacles and service connections using close circuit television (CCTV) inspection techniques. The pipeline interior shall be carefully inspected to determine the location of any conditions that may prevent proper installation of CIPP. These shall be noted and corrected. A videotape and suitable written log for each line section shall be produced for later reference by the Owner.
8. The Contractor shall field verify the pipe diameter at the manhole and the lengths of the sections to be rehabilitated prior to ordering liner materials. The Contractor shall notify the Engineer of any discrepancies between the information obtained in the field and the data in these bid documents and specifications or plans.
C. Installation
1. If following the cleaning and video inspection process noted above in the preparatory work, flow was reintroduced into the pipe or greater than a (1) hour delay has occurred since the completion of this process, the existing host pipe shall be cleaned and CCTV inspection performed again after sewage has been bypassed and just prior to insertion of the liner.
2. A maximum of one (1) hour may elapse between this final cleaning pass and the insertion of the liner.
3. CIPP installation shall be in accordance with ASTM F1216, Section 7, or ASTM F1743, Section 6, with the following modifications:
A. The quantity of resin used for tube impregnation shall be sufficient to fill the volume of air voids in the tube with additional allowances for polymerization shrinkage and the potential loss of resin during installation through cracks and irregularities in the original pipe wall, as applicable.
B. The wet out tube shall be positioned in the pipeline using either inversion or a pull-in method as defined within relevant ASTM standards previously stipulated. If pulled into place, a power winch or its equivalent should be utilized and care should be exercised not to damage the tube as a result of pull-in friction. The tube should be pulled-in or inverted through an existing manhole or approved access point and fully extend to the next designated manhole or termination point.
C. Temperature gauges shall be placed between the tube and the host pipe’s invert position to monitor the temperatures during the cure cycle.
D. Curing shall be accomplished by utilizing hot water under hydrostatic pressure or steam pressure in accordance with the manufacturer’s recommended cure schedule. A cool-down process shall be conducted that complies with the resin manufacturer’s specification.
Redlands Regular Meeting of 06-20-2023 1216 of 1523
CURED-IN-PLACE PIPE 02766-7
D. Reinstatement of Lateral Connections
1. It is the intent of these specifications that branch connections to buildings be reopened without excavation, utilizing a remotely controlled cutting device, monitored by a CCTV. The Contractor shall certify a minimum of two complete functional cutters plus key spare components are on the job site before each installation or are in the immediate area of the jobsite and can be quickly obtained.
Unless otherwise directed by the Owner or his authorized representative, all laterals will be reinstated. No excavation will be allowed to reinstate any lateral connection.
The Contractor will be responsible for all costs and liability associated with lateral reinstatement.
2. Solid round cuts, “cookies”, will not be allowed to be performed for the reinstatement. All lateral re-establishment shall adhere to the following:
A. A remote cutting device shall re-establish each service lateral by cutting strips.
B. The opening shall be between 95%-100% of the original opening.
C. The edges of the opening shall not have any pipe or liner fragments which may obstruct flow or snag debris.
D. All solids generated from cutting must be captured and removed downstream by the Contractor.
3. If lateral connections are cut greater than 100% of the original opening, the Contractor shall install a CIPP type repair sufficiently sized to completely cover the over-cut service connection. No additional compensation will be allowed for overcut service lateral connections.
E. Liner Termination Points
1. The beginning and end of the CIPP shall be cut flush at the inlet and outlet points in the manhole.
2. The ends shall be permanently sealed to the rehabilitated pipeline to prevent any infiltration between the CIPP and the host pipe.
3. Ends shall be sealed with a sealing material that is recommended by the liner manufacturer.
4. Sealing:
A. Shall be compatible with the liner/resin system, provide a watertight seal, and is approved by the City prior to start of construction.
B. Hydraulic cements and quick-set cement products are not acceptable.
Redlands Regular Meeting of 06-20-2023 1217 of 1523
CURED-IN-PLACE PIPE 02766-8
C. Acceptable materials shall be an approved epoxy type product that will bond, not crack, dry up, slough off, or shrink in time, and provide a good transition in the manholes.
D. Sealing terminations shall be performed at no additional cost to the City.
PART 4 - INSPECTION
A. Liner Sample Testing
1. All sampling and testing of the CIPP liner shall be completed by the contractor via a third party testing laboratory. All costs associated with the test, shipping and receipt of the results in accordance with these specifications shall be included within the unit price listed in the bid schedule.
2. Samples shall be taken at the frequency identified within these specifications. Pipe physical properties will be tested in accordance with ASTM F1216 or ASTM F1743, Section 8, using either method proposed. The flexural properties must meet or exceed the values listed in the table on page 4 of this specification, Table 1 of ASTM F1216 or the values submitted to the Owner/engineer by the contractor for this project’s CIPP wall design, whichever is greater.
3. Wall thickness of samples shall be determined as described in paragraph 8.1.6 of ASTM F1743. The minimum wall thickness at any point shall not be less than 87½% of the submitted minimum design wall thickness as noted within this specification.
4. Visual inspection of the CIPP shall be in accordance with ASTM F1743, Section
8.6. 5. The tests shall be performed at an independent, third party laboratory experienced with CIPP testing, which has been approved by the Engineer. Third party laboratory/testing facility is defined as ASTM accredited materials testing firm with no financial or directorial link to liner manufacturer or Contractor.
6. Contractor shall be responsible for all shipping and handling costs associated with sending samples to be tested to the independent testing laboratory. The cost of testing shall be paid by the Contractor at the unit bid price noted in the bid schedule.
7. Samples shall be taken as noted below:
A. One sample shall be taken from the first segment of CIPP liner material installed for each size within the project.
B. For each 3,000 LF of additional installed length installed, a minimum one field sample shall be prepared and tested.
Redlands Regular Meeting of 06-20-2023 1218 of 1523
CURED-IN-PLACE PIPE 02766-9
8. The Contractor shall determine sampling location and procedures to ensure representative samples are obtained from the finished liner, subject to approval by the Engineer. The Engineer must be notified 48 hours prior to field sample collection. The Engineer or other City representative must be on-site when field sample is collected. The City reserves the right to make alterations, deviations, additions to or omissions from the performance testing.
9. The Contractor shall furnish removable sizing sleeves to collect liner samples which accurately replicate the host pipe diameter.
10. Test results shall be sent directly to the Engineer from the testing laboratory within fourteen (14) days or less of the field sample date. Testing laboratory shall submit wet singed and stamped hard copies of the results. Contractor is responsible for cost associated with laboratory sending results directly to the Engineer.
11. If the results of testing do not meet the latest published specifications of the manufacturer, or the physical property values listed within these specifications, the City will choose one of the following options for remediation:
A. Payment for that length will be reduced by an equal percentage of the 50-year useful life that has not been achieved, as shown by the test results.
B. The City shall require the Contractor to replace the material with the material which was stated on the submittals, and retest to verify compliance.
C. The City shall reserve the right to require the Contractor to dig up the sewer line and replace it with new PVC SDR 35 sewer line. Many locations within this project are streets which are currently scheduled for resurfacing. In the event the liner is rejected and the pipe must be excavated and replaced, the Contractor shall be responsible to remove and replace the pavement area affected, utilizing a process and replacement area approved by the City.
12. The City shall reserve the right to require the Contractor to meet their stated qualifications using the method that best serves the City.
B. Liner Field Testing
1. Prior to reinstatement of all live service laterals, the Contractor shall perform leakage testing on the liner in accordance with ASTM F1216 or as approved by the City. If liner requires repair, testing shall be performed again after repair is complete. Contractor may utilize CIPP curing water as a means to complete the testing.
2. Exfiltration test:
A. Plug the downstream end of the lined pipe segment and install a standpipe to the lined pipe's upstream end using appropriately sized 90-degree elbow fittings, plastic standpipe and flexible watertight couplings.
Redlands Regular Meeting of 06-20-2023 1219 of 1523
CURED-IN-PLACE PIPE 02766-10
B. Contractor shall remove all air from line to be tested.
C. The standpipe shall be temporarily secured within the manhole.
D. Contractor shall perform exfiltration test as specified in ASTM F1216.
E. The allowable water exfiltration shall not exceed the limits stated in ASTM F1216 for the pipe to be accepted as watertight.
F. If the lined pipe segment does not meet the requirements of the exfiltration test, repair or replace and retest the lined pipe segment so that it meets the requirements at no additional cost to the City.
3. Air test:
A. The Contract may substitute an air pressure test in lieu of the exfiltration test as approved by the City.
B. Requirements for air testing may include:
(1) Securely plug all openings in the line to be tested. (2) Apply an approximate air pressure of four (4) psi.
(3) Time for a one (1) psi pressure drop shall be at least ten (10) minutes or as approved by the City.
4. A post installation video inspection shall be performed by the Contractor in accordance with Section 500-1.1.5 while all flow is bypassed and all laterals have been reinstated. All videos completed during the lining process, including cleaning, pre-installation and post-installation shall be provided to the City on DVD and arranged by segment. Videos shall be labeled and an index provided to easily differentiate between phases of video and segments.
5. Videos shall be delivered within 7 days of completion of the lining process to allow time for review by the City. No progress payments will be made for lining amounts installed without the review and approval of all captured videos.
PART 5 - ACCEPTANCE
A. Finished Liner
1. Shall be inner polyethylene layer and an outer polyester felt layer impregnated with a thermosetting resin to fit tightly against the existing inside pipe wall.
2. Shall be fabricated from materials that, when cured, shall be chemically resistant to withstand internal exposure to sewage gases containing quantities of hydrogen Redlands Regular Meeting of 06-20-2023 1220 of 1523
CURED-IN-PLACE PIPE 02766-11
sulfide, carbon monoxide, methane, petroleum hydrocarbons, moisture saturation, and dilute sulfuric acid.
3. Shall be continuous over the length of pipe rehabilitated.
4. Shall be free from dry spots, delamination, lifts, fins and the like as identified by the City. Contractor shall remove and replace the CIPP full circumference, from manhole to manhole or as directed by the City if these conditions are present.
5. If the liner fails to re-form or cure, the Contractor shall be required to remove the failed liner at no additional cost to the City.
B. Interior Surface
1. No wrinkles exceeding the tolerances found in Table 1 – Liner Repair Guidelines will be allowed to remain within the liner.
2. Interior surface liner within ten (10) feet of manholes shall be wrinkle free. All wrinkles within this limit shall be properly removed to allow proper installation of flow restricting plugs.
3. Wrinkles in the finished lined pipe which:
A. Cause a backwater greater than three-eighths (3/8) inch in depth, B. Reduce the hydraulic capacity of the pipeline as determined by the City, C. Cause a maintenance problem or inconvenience as determined by the City, D. Cause debris and solids to hang-up and accumulate,
E. Reduce the structural stability of the pipe,
Are unacceptable and shall be removed or repaired by the Contractor in a method that is approved by the City at no additional cost.
4. If wrinkles are detected in the installed liner, the Contractor shall provide photographs and dimensions of the wrinkle including height and direction.
C. Defective Liner and Repair Guidelines
1. All liners that do not meet the quality specified above shall be assessed by the City based on the guidelines shown in Table 1; City’s assessment and remedy shall be final. All repairs shall be performed by the Contractor at no additional cost.
2. All repairs shall meet the original specifications for finished liner. The repair plan shall be submitted by the Contractor, reviewed, and approved by the City prior to any corrective action for any and all defects.
Redlands Regular Meeting of 06-20-2023 1221 of 1523
CURED-IN-PLACE PIPE 02766-12
3. All repairs shall be performed within ten working days after notification to the Contractor of the defect.
4. For any deficiencies that not feasible to be repaired by the guidelines above, the City shall reserve the right to require the Contractor remove the existing sewer line and replace it with new PVC SDR 35 sewer line if all other methods of correction are not successful.
5. Many locations within this project are streets which are currently scheduled for resurfacing. In the event the liner is rejected and the pipe must be excavated and replaced, the Contractor shall be responsible to remove and replace the pavement area affected, utilizing a process and replacement area approved by the City
END OF SECTION
Redlands Regular Meeting of 06-20-2023 1222 of 1523
APPENDIX
Redlands Regular Meeting of 06-20-2023 1223 of 1523
THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 06-20-2023 1224 of 1523
APPENDIX A
CHECKLIST OF LABOR LAW REQUIREMENTS
Redlands Regular Meeting of 06-20-2023 1225 of 1523
THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 06-20-2023 1226 of 1523
CHECKLIST OF LABOR LAW REQUIREMENTS
TO REVIEW AT JOB CONFERENCE MEETINGS
Name (print) Date
Company Project
The Federal and State labor law requirements applicable to the contract are composed of, but not limited to, the following:
1. Payment of Prevailing Wage Rates
The contractor to whom the contract is awarded and its subcontractors hired for the public works project are required to pay not less than the specified general prevailing wage rates to all workers employed in the execution of the contract. The contractor is responsible for ascertaining and complying with all current general prevailing wage rates for crafts and any rate changes that occur during the life of the contract.
Information on all prevailing wage rates and all rate changes are to be posted at the job site for all workers to view.
2. Apprentices
It is the duty of the contractor and subcontractors to employ registered apprentices on the public works project under Labor Code Section 1777.5.
3. Penalties
There are penalties required for contractor's/subcontractor's failure to pay prevailing wages and for failure to employ apprentices, including forfeitures and debarment under Labor Code Sections 1775; 1776; 1777.1; 1777.7 and 1813.
4. Certified Payroll Reports
Under Labor Code Section 1776, contractors and subcontractors are required to keep accurate payroll records showing the name, address, social security number and work classification of each employee and owner performing work; also the straight time and overtime hours worked each day and each week, the fringe benefits, and, the actual per diem wage paid to each owner, journey person, apprentice worker or other employee hired in connection with the public works project. Employee payroll records shall be certified and shall be made available for inspection at all reasonable hours at the principal office of the contractor/subcontractor, or shall be furnished to any employee, or his/her authorized representative on request, pursuant to Labor Code Section 1776. Each contractor and subcontractor shall submit its weekly certified payroll reports to the LCR from the agency no less than weekly or within ten days of request. In the event that there has been no work performed during a given week, the certified payroll report shall be annotated: "No work" for that week. Under Labor Code Section 1776(h) there are penalties required for contractor's/ subcontractor's failure to maintain and submit copies of certified payroll records on request. **For projects bidding after April 1, all contractors will need to upload their certified payroll to the Department of Labor Standards Enforcement website. Effective Jan. 1, 2016, ALL projects will require contractors to upload all certified payroll. This requirement is in addition to the request for payrolls by the City of Redlands;
5. Nondiscrimination in Employment
There exist prohibitions against employment discrimination under Labor Code Sections 1735 and 1777.6, the Government Code, the Public Contracts Code, and Title VII of the Civil Rights Act of 1964.
6. Kickbacks Prohibited
Contractors and subcontractors are prohibited from recapturing wages illegally or extracting "kickbacks" from employee wages under Labor Code Section 1778.
Redlands Regular Meeting of 06-20-2023 1227 of 1523
7. Acceptance of Fees Prohibited
There exists a prohibition against contractor/subcontractor acceptance of fees for registering any person for public work under Labor Code Section 1779; or for filling work orders on public works contracts pursuant to Labor Code Section 1780.
8. Listing of Subcontractors
All prime contractors are required to list properly all subcontractors hired to perform work on the public works projects covering more than one-half of one percent, pursuant to Government Code 4100 et seq.
9. Properly Licensed and Registered
Contractors are required to be licensed properly and to require that all subcontractors be properly licensed.
Penalties are required for employing workers while unlicensed under Labor Code Section 1021 and under the California Contractor License Law found at Business and Professions Code Section 7000 et seq.
Contractors and subcontractors are also required to be registered with the Division of Labor Standards Enforcement to work on public works projects in California. Requirements for registration and penalties for not being registered are found in Labor Code 1773.3.
10. Unfair Competition Prohibited
Contractors and subcontractors are prohibited from engaging in unfair competition as specified under Business and Professions Code Sections 17200 to 17208.
11. Workers Compensation Insurance
Labor Code 1861 requires contractors and subcontractors be insured properly for workers compensation.
12. OSHA
Contractors and subcontractors are required to abide by the Occupational, Safety and Health laws and regulations that apply to the particular construction project.
13. Undocumented Workers
Contractors and subcontractors are prohibited by the Federal government against hiring undocumented workers, and must secure proof of eligibility/citizenship from all workers.
14. Itemized Wage Statements
Contractors and subcontractors must provide itemized wage statements to employees per Labor Code 226.
In accordance with Federal and State laws and with the awarding agency contract documents, the undersigned prime contractor wishes to assure the City of Redlands that it intends to comply with the above-referenced labor law requirements, fully understanding that failure to comply with the above requirements may subject it to penalties as provided above.
Contractor City of Redlands
Name Printed Name Printed
Signature Signature
Title Title
Date Date
Redlands Regular Meeting of 06-20-2023 1228 of 1523
IMPORTANT NOTICE
New Requirements for Contractors Working on California
Public Works / Prevailing Wage Projects
Significant changes in prevailing wage law have recently been made that affect all contractors working on Public Works Projects within California. Please note the following important information:
CONTRACTOR REGISTRATION REQUIREMENT
By April 1, 2015, all contractors must be registered with the Division of Labor Standards Enforcement (DLSE) to work on public works projects in California.
WHO must register?
All contractors and subcontractors working on public works projects in California must be registered. This includes prime contractors, subcontractors and sole owner/operators- everyone performing labor on a public works project.
WHEN is registration required?
Contractors must be registered with the DLSE to bid on all public works projects that bid after March 1, 2015.
All contractors working on public works projects must be registered by April 1, 2015. Registration is valid until June 30 of each year and may be renewed annually. Registrations are currently being accepted.
WHERE do I register?
Registration is done online at:
https://efiling.dir.ca.gov/PWCR/ActionServlet?action=displayPWCRegistrationForm HOW MUCH is the fee?
Contractor registration fee is currently set at $300 but may increase each year. This fee shall be paid during the initial registration and each annual renewal.
DO I qualify for registration?
Contractors will need to meet minimum qualification standards to be registered. These include:
• Be properly licensed with the Contractors State License Board for your trade. • Provide evidence of workers compensation insurance (if applicable). • Be in good standing (Have no outstanding liabilities for wages, damages, penalties due to an employee or the State, may not be under State or Federal debarment).
Redlands Regular Meeting of 06-20-2023 1229 of 1523
WHAT happens if I don’t register?
Unregistered contractors working on or bidding for public works projects will be subject to an immediate $2,000 fine and the $300 registration fee to continue working on the project. Unregistered contractors may be removed from the project by the Awarding Agency. Contractors found working on public works projects without being registered also risk not being approved for registration by DLSE.
ELECTRONIC CERTIFIED PAYROLL REPORTING REQUIREMENTS
Prevailing wage law has been changed to require contractors to submit certified payrolls electronically to the DLSE.
WHO is required to submit certified payrolls?
All contractors, subcontractors and sole owner/operators will be required to submit certified payrolls electronically to the DLSE.
WHEN do I need to submit certified payrolls electronically? If your project is awarded after April 1, 2015, electronic payroll submission is required immediately.
Otherwise, electronic payroll submission will be required for all projects awarded on or after January 1, 2016.
WHERE do I submit my certified payrolls?
For now, certified payrolls can be submitted by contractors to the DLSE at:
https://apps.dir.ca.gov/ecpr/DAS/AltLogin This website address will change when the DLSE implements their online electronic database system which still has not been developed. Alliant will notify contractors when this system is available.
DO I still need to submit hard copy certified payrolls? The City of Redlands will still require hard copy submission of certified payroll reports per your contract. The requirement to submit certified payrolls electronically to the DLSE does not replace the requirement for contractors to submit payrolls to the City of Redlands.
Contact the City of Redlands regarding any questions you may have regarding the new requirements for contractor registration or online submission of certified payroll: (909) 798-7698.
Redlands Regular Meeting of 06-20-2023 1230 of 1523
PUBLIC WORKS CONTRACT AWARD INFORMATION (DAS-140)
This is not a request for dispatch of apprentices.
Contract award information must be sent to your Apprenticeship Committee if you are approved to train. If you are not approved to train, you must send the information (which may be this form) to ALL applicable Apprenticeship Committees in your craft or trade in the area of the site of the public work.
Go to: http://www.dir.ca.gov/das/PublicWorksForms.htm for information about programs in your area and trade. The information shall be provided to the applicable apprenticeship committee within ten (10) days of the date of the execution of the prime contract or subcontract, but in no event later than the first day in which the contractor has workers employed upon the public work.
Do not send this form to the Division of Apprenticeship Standards.
NAME OF YOUR COMPANY CONTRACTORS STATE LICENSE NO.
MAILING ADDRESS-NUMBER & STREET, CITY, ZIP CODE AREA CODE & TELEPHONE NO.
NAME AND ADDRESS OF PUBLIC WORKS PROJECT DATE YOUR CONTRACT WAS EXECUTED
DATE OF EXPECTED/ACTUAL START OF PROJECT
NAME & ADDRESS OF PUBLIC AGENCY AWARDING CONTRACT ESTIMATED NUMBER OF JOURNEYMAN HOURS
OCCUPATION OF APPRENTICE
THIS FORM IS BEING SENT TO: (NAME AND ADDRESS OF APPRENTICESHIP PROGRAM(S) ESTIMATED NUMBER OF APPRENTICE HOURS
APPROXIMATE/ACTUAL DATES TO BE EMPLOYED
This is not a request for dispatch of apprentices.
*Contractors must make a separate request for actual dispatch, in accordance with Section 230.1(a) California Code of Regulations* Check One of the Boxes Below
1. We are already approved to train apprentices by the
Apprenticeship Committee. We will employ and train under their standards. (Enter name of Committee)
2. We will comply with the standards of
Apprenticeship Committee for the duration of this job only. (Enter name of Committee)
3. We will employ and train apprentices in accordance with the California Apprenticeship Council regulations, including § 230.1 (c) which requires that apprentices employed on public projects can only be assigned to perform work of the craft or trade to which the apprentice is registered and that the apprentices must at all times work with or under the direct supervision of journeyman/men.
Signature Date
Typed Name
Title
Redlands Regular Meeting of 06-20-2023 1231 of 1523
2J
DAS-140 FORM - PUBLIC WORKS CONTRACT AWARD INFORMATION
(Title 8, California Code of Regulations, Section 230)
(California Labor Code, Section 1777.5 (e))
SUBMIT CONTRACT AWARD INFORMATION
Prior to commencing work on a contract for Public Works every Contractor shall provide contract award information to the apprenticeship committee for each applicable apprenticeable craft or trade in the area of the site of the public works project that has approved the contractor to train apprentices. Contractors who are not already approved to train by an apprenticeship program sponsor shall provide contract award information to all of the applicable apprenticeship committees whose geographic area of operation includes the area of the public works project. This contract award information shall be in writing on a DAS Form 140, Public Works Contract Award Information or a letter which includes the following information:
(1) Contractor's name, address, telephone number and state license number; (2) The full name and address of the public work awarding agency; (3) The exact location of the public work site;
(4) Date of the contract award;
(5) Expected start date of the work;
(6) Estimated journeyman hours;
(7) Occupation of Apprentice;
(8) Approximate number of apprentices to be employed; and (9) Approximate dates apprentices will be employed.
This information shall be provided to the applicable apprenticeship committee within ten (10) days of the date of the execution of the prime contract or subcontract, but in no event later than the first day in which the contractor has workers employed upon the public work.
Failure to provide contract award information, which is known by the awarded contractor, shall be deemed to be a continuing violation for the duration of the contract, ending when a Notice of Completion is filed by the Awarding Body, for the purpose of determining the accrual of penalties under Labor Code Section 1777.7.
THE TOP SECTION OF THE FORM COMPLETELY FILLED OUT will provide the information required pursuant to California Labor Code Section 1777.5 and California Code of Regulations Section 230.1.
LOWER SECTION OF THE FORM Check an appropriate box (#1, 2 or 3) for your status.
In addition to the “ORIGINAL(S)” mailed to all applicable Apprenticeship Committees, a copy of this information shall also be submitted to the City of Redlands.
NOTE: The filing of a DAS 140 is not a request for the dispatch of registered apprentices Redlands Regular Meeting of 06-20-2023 1232 of 1523
CONTRACTOR FRINGE BENEFIT STATEMENT
Project Name: Project Location: Today’s Date:
Contractor / Subcontractor Name: Business Address:
In order that the proper Fringe Benefit rates can be verified when checking payrolls on the above contract, the hourly rates for fringe benefits, subsistence and/or travel allowance payment made for employees by the employer on the various classes of work are tabulated below. Please Include Apprentice Rates.
Classification: Effective Date: Subsistence or Travel Pay:
$________________________
EMPLOYER PAID FRINGE BENEFITS
Health & Welfare
$_______________ hr
Paid To:
Name of Plan/Fund/Program:
Address:
__________________________________________________
__________________________________________________
Pension
$_______________ hr
Paid To:
Name of Plan/Fund/Program:
Address:
__________________________________________________
__________________________________________________
Vacation/Holiday
$_______________ hr
Paid To:
Name of Plan/Fund/Program:
Address:
__________________________________________________
__________________________________________________
Training
$_______________ hr
Paid To:
Name of Plan/Fund/Program:
Address:
__________________________________________________
__________________________________________________
Other
$_______________ hr
Paid To:
Name of Plan/Fund/Program:
Address:
__________________________________________________
__________________________________________________
Classification: Effective Date: Subsistence or Travel Pay:
$________________________
EMPLOYER PAID FRINGE BENEFITS
Health & Welfare
$_______________ hr
Paid To:
Name of Plan/Fund/Program:
Address:
__________________________________________________
__________________________________________________
Pension
$_______________ hr
Paid To:
Name of Plan/Fund/Program:
Address:
__________________________________________________
__________________________________________________
Vacation/Holiday
$_______________ hr
Paid To:
Name of Plan/Fund/Program:
Address:
__________________________________________________
__________________________________________________
Training
$_______________ hr
Paid To:
Name of Plan/Fund/Program:
Address:
__________________________________________________
__________________________________________________
Other
$_______________ hr
Paid To:
Name of Plan/Fund/Program:
Address:
__________________________________________________
__________________________________________________
Supplemental statements must be submitted during the progress of the work should there be an increase or change in rates. Use additional sheets as necessary. (Attach a copy of your most recent premium transmittal (including copy of check submitted) into each of the above plans/funds/programs or a letter from the above plans/funds/programs reflecting current payment status).
I certify under penalty of perjury that fringe benefits are paid to the approved plans, funds or programs as listed above.
Print Name and Title Signature and Date (Wet Signature Required) Redlands Regular Meeting of 06-20-2023 1233 of 1523
S = STRAIGHT TIME *OTHER – Any other deductions, contributions and/or payments whether or not included or required by prevailing CERTIFICATION MUST be completed Form A-1-131 (New 2-80) O = OVERTIME wage determinations must be separately listed. Use extra sheet(s) if necessary (See reverse side) SDI = STATE DISABILITY INSURANCE
California Department of
Industrial Relations
Page ______ of ______
NAME OF CONTRACTOR: CONTRACTOR'S LICENSE NO.: ADDRESS:
OR SUBCONTRACTOR: SPECIALITY LICENSE NO.:
PAYROLL NO.: FOR WEEK ENDING: SELF-INSURED CERTIFICATE NO.: PROJECT OR CONTRACT NO.:
(4) DAY (5) (6) WORKERS' COMPENSATION POLICY NO.: PROJECT AND LOCATION:
(2) M T W TH F S S (9)
DATE
(1)
NAME, ADDRESS AND
SOCIAL SECURITY NUMBER
OF EMPLOYEE
NO. OF WITHHOLDING
EXEMPTIONS
(3)
WORK
CLASSIFICATION
HOURS WORKED EACH DAY
TOTAL
HOURS
HOURLY
RATE
OF PAY
(7)
GROSS AMOUNT
EARNED
(8)
DEDUCTIONS, CONTRIBUTIONS AND PAYMENTS
NET WGS
PAID FOR
WEEK
CHECK
NO.
THIS
PROJECT
ALL
PROJECTS
FED.
TAX
FICA
(SOC. SEC.)
STATE
TAX SDI
VAC/
HOLIDAY
HEALTH & WELF. PENSION
S
TRAING. FUND
ADMIN
DUES
TRAV/ SUBS. SAVINGS OTHER*
TOTAL DEDUCTIONS
O
THIS
PROJECT
ALL
PROJECTS
FED.
TAX
FICA
(SOC. SEC.)
STATE
TAX SDI
VAC/
HOLIDAY
HEALTH & WELF. PENSION
S
TRAING. FUND
ADMIN
DUES
TRAV/ SUBS. SAVINGS OTHER*
TOTAL DEDUCTIONS
O
THIS
PROJECT
ALL
PROJECTS
FED.
TAX
FICA
(SOC. SEC.)
STATE
TAX SDI
VAC/
HOLIDAY
HEALTH & WELF. PENSION
S
TRAING. FUND
ADMIN
DUES
TRAV/ SUBS. SAVINGS OTHER*
TOTAL DEDUCTIONS
O
THIS
PROJECT
ALL
PROJECTS
FED.
TAX
FICA
(SOC. SEC.)
STATE
TAX SDI
VAC/
HOLIDAY
HEALTH & WELF. PENSION
S
TRAING. FUND
ADMIN
DUES
TRAV/ SUBS. SAVINGS OTHER*
TOTAL DEDUCTIONS
O
PUBLIC WORKS PAYROLL REPORTING FORM
Redlands Regular Meeting of 06-20-2023 1234 of 1523
Statement of Compliance
Date:______________
I __________________, the undersigned, am the ________________________________ with the authority to act for and on (Print Name) (Position in Business)
behalf of _______________________ certify under penalty of perjury that the records commencing on ______________ and ending on _______________ submitted herein and consisting of ____ pages are the originals, full and corrected documents, which depict the payroll record(s) of actual disbursements by way of cash, check, or whatever form to the individual or individuals names, (1) That this employer has complied with the requirements of the California Labor Code Sections. 1771, 1811, and 1815 for all performed on this public works project, and that the classifications set forth therein for each trade rate conform with the work Performed.
(2) That any apprentices employed in the above period are duly registered to a bona fide apprenticeship program registered with the State of California’s Division of Apprenticeship Standards.
PAYROLL/OTHER DEDUCTIONS
1. I herein certify the full and complete Prevailing Wages were paid as currently published and posted by the Director of Industrial Relations, State of California and only deductions as authorized under the laws of the State of California or the laws of United States of America have been made from these sums.
2. All other deductions are clearly listed for each employee on an attachment as required by the Director of Industrial Relations, State of California.
OPTIONAL BENEFIT PLANS
I herein certify that all employee deductions for benefit plans are authorized and the employee(s) are signed up for the plan(s) and are receiving the benefit(s) of the plan(s) listed.
WHERE FRINGE BENEFITS ARE PAID TO APPROVED PLANS, FUNDS, OR PROGRAMS In addition to the basic hourly wage rates paid to each laborer or mechanic listed in the above payroll, payment of fringe benefits as listed in the contract have or will be made to the appropriate programs for the benefit of such employees, except as noted below.
WHERE FRINGE BENEFITS ARE PAID IN CASH
Each laborer or mechanic listed in the above payroll has been paid as indicated on the payroll, an amount not less the sum of the applicable basic hourly rate plus the amount of the required fringe benefits as listed in the determination for the craft, except as noted below,
Exception(s)
________________________________________________________________________________________________________ Craft Explanation
________________________________________________________________________________________________________ Craft Explanation
________________________________________________________________________________________________________ Craft Explanation
I herein certify under the penalty of perjury all of the above is true and correct as submitted. ________________________________________________________________________________________________________ Name Signature
________________________________________________________________________________________________________ Date Payroll #
Remarks
____________________________________________________________________________________________________ Redlands Regular Meeting of 06-20-2023 1235 of 1523
2N
CONTRACTOR INFORMATION SHEET
Job Name: _________________________________________ Category: ____________________________________ Prime Contractor: ___________________________________________________________________________________ Subcontractor: ______________________________________ License#: _____________________________________ Address: ____________________________________________________________________________________________ Phone #: ___________________________________________ Payroll Report Contact: _______________________ Email Address: _____________________________________________________________________________________ Fax #: ______________________________________________ Contract Amount: ____________________________ Estimated Start Date: _______________________________ Estimated End Date: _________________________ ANTICIPATED TRADES/CLASSIFICATIONS:
______________________________________________ ______________________________________________ ______________________________________________ ______________________________________________ ______________________________________________ ______________________________________________ SUB-CONTRACTORS (if applicable)
Name: License #: Phone/ Fax #: Contact:
______________________________________________________________________________________________________ ______________________________________________________________________________________________________ ______________________________________________________________________________________________________ Redlands Regular Meeting of 06-20-2023 1236 of 1523
APPENDIX B
CITY OF REDLANDS
WORKDAY CONSTRUCTION SCHEDULE
Redlands Regular Meeting of 06-20-2023 1237 of 1523
THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 06-20-2023 1238 of 1523
CITY OF REDLANDS
MUNICIPAL UTILITIES AND ENGINEERING DEPARTMENT 2017
APPENDIX B
CONSTRUCTION WORKDAY CALENDAR
JANUARY FEBRUARY MARCH
S M T W T F S S M T W T F S S M T W T F S
1 2 3 4 5 6 7 1 2 3 4 1 2 3 4
1 2 3 4 5 6 7 32 33 34 35 60 61 62 63
8 9 10 11 12 13 14 5 6 7 8 9 10 11 5 6 7 8 9 10 11
8 9 10 11 12 13 14 36 37 38 39 40 41 42 64 65 66 67 68 69 70 15 16 17 18 19 20 21 12 13 14 15 16 17 18 12 13 14 15 16 17 18 15 16 17 18 19 20 21 43 44 45 46 47 48 49 71 72 73 74 75 76 77 22 23 24 25 26 27 28 19 20 21 22 23 24 25 19 20 21 22 23 24 25 22 23 24 25 26 27 28 50 51 52 53 54 55 56 78 79 80 81 82 83 84 29 30 31 26 27 28 26 27 28 29 30 31
29 30 31 57 58 59 85 86 87 88 89 90
APRIL MAY JUNE
S M T W T F S S M T W T F S S M T W T F S
1 1 2 3 4 5 6 1 2 3
91 121 122 123 124 125 126 152 153 154
2 3 4 5 6 7 8 7 8 9 10 11 12 13 4 5 6 7 8 9 10
92 93 94 95 96 97 98 127 128 129 130 131 132 133 155 156 157 158 159 160 161 9 10 11 12 13 14 15 14 15 16 17 18 19 20 11 12 13 14 15 16 17 99 100 101 102 103 104 105 134 135 136 137 138 139 140 162 163 164 165 166 167 168 16 17 18 19 20 21 22 21 22 23 24 25 26 27 18 19 20 21 22 23 24 106 107 108 109 110 111 112 141 142 143 144 145 146 147 169 170 171 172 173 174 175 23 24 25 26 27 28 29 28 29 30 31 25 26 27 28 29 30
113 114 115 116 117 118 119 148 149 150 151 176 177 178 179 180 181 30 120
JULY AUGUST SEPTEMBER
S M T W T F S S M T W T F S S M T W T F S
1 1 2 3 4 5 1 2
182 213 214 215 216 217 244 245
2 3 4 5 6 7 8 6 7 8 9 10 11 12 3 4 5 6 7 8 9
183 184 185 186 187 188 189 218 219 220 221 222 223 224 246 247 248 249 250 251 252 9 10 11 12 13 14 15 13 14 15 16 17 18 19 10 11 12 13 14 15 16 190 191 192 193 194 195 196 225 226 227 228 229 230 231 253 254 255 256 257 258 259 16 17 18 19 20 21 22 20 21 22 23 24 25 26 17 18 19 20 21 22 23 197 198 199 200 201 202 203 231 233 234 235 236 237 238 260 261 262 263 264 265 266 23 24 25 26 27 28 29 27 28 29 30 31 24 25 26 27 28 29 30 204 205 206 207 208 209 210 239 240 241 242 243 267 268 269 270 271 272 273 30 31
211 212
OCTOBER NOVEMBER DECEMBER
S M T W T F S S M T W T F S S M T W T F S
1 2 3 4 5 6 7 1 2 3 4 1 2
274 275 276 277 278 279 280 305 306 307 308 335 336
8 9 10 11 12 13 14 5 6 7 8 9 10 11 3 4 5 6 7 8 9
281 282 283 284 285 286 287 309 310 311 312 313 314 315 337 338 339 340 341 342 343 15 16 17 18 19 20 21 12 13 14 15 16 17 18 10 11 12 13 14 15 16 288 289 290 291 292 293 294 316 317 318 319 320 321 322 344 345 346 347 348 349 350 22 23 24 25 26 27 28 19 20 21 22 23 24 25 17 18 19 20 21 22 23 295 296 297 298 299 300 301 323 324 325 326 327 328 329 351 352 353 354 355 356 357 29 30 31 26 27 28 29 30 24 25 26 27 28 29 30
302 303 304 330 331 332 333 334 358 359 360 361 362 363 364 31 365
City Holiday
Closed
Redlands Regular Meeting of 06-20-2023 1239 of 1523
THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 06-20-2023 1240 of 1523
APPENDIX C
CCTV INSPECTION VIDEOS
Click on link below to view CCTV Inspection Videos.
For password email Project Manager at [email protected].
CCTV INSPECTION VIDEOS LINK
Redlands Regular Meeting of 06-20-2023 1241 of 1523
THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 06-20-2023 1242 of 1523
APPENDIX D
CITY OF REDLANDS
CONTRACTOR SAFETY PROGRAM
Redlands Regular Meeting of 06-20-2023 1243 of 1523
THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 06-20-2023 1244 of 1523
THE CITY OF REDLANDS
CONTRACTOR SAFETY
PROGRAM
Rev. June 15, 2021
Redlands Regular Meeting of 06-20-2023 1245 of 1523
TABLE OF CONTENTS
I. POLICY......................................................................................................................3 II. AUTHORITY..............................................................................................................3 III. SCOPE.....................................................................................................................3 IV. DEFINITIONS...........................................................................................................3 V. RESPONSIBILITIES ....................................................................................................4 RISK MANAGEMENT... …………………………………………………………………………………………………………4 PROJECT MANAGER (CITY)……………………………………………………………………………………………………..5 INSPECTOR (CITY)………………………………………………………………………………………………………………..5 EMPLOYEES (CITY)……………………………………………………………………………………………………………….5 CONTRACTOR…………………………………………………………………………………………………………………….5 PROJECT SAFETY OFFICIAL……………………………………………………………………………………………………..6 VI. PROGRAM ..............................................................................................................6 SAFETY PREQUALIFICATION QUESTIONNAIRE……………………………………………………………………………..6 APPEAL PROCESS…………………………………………………………………………………………………………………7 CONSTRUCTION PROJECTS (TIER I AND TIER II)…………………………………………………………………………….8 INSPECTIONS……………………………………………………………………………………………………………………..9 TRAINING/DOCUMENTATION………………………………………………………………………………………………...9 NON-COMPLIANCE………………………………………………………………………………………………………………9 CITY PERSONNEL………………………………………………………………………………………………………………….9 VII. RECORDKEEPING………………………………………………………………………………………………….10 VIII. ADDITIONAL REFERENCES ...................................................................................10 ACKNOWLEDGMENT OF RECEIPT (A)……………………………………………………………………………………….11 SAFETY PREQUALIFICATION QUESTIONNAIRE (B)………………………………………………………………………..12 NOTICE OF NONCOMPLIANCE (C)…………………………………………………………………………………………..13 JOB HAZARD ANALYSIS (D)……………………………………………………………………………………………………14 INCIDENT INVESTIGATION FORM (E)………………………………………………………………………………………..15 Redlands Regular Meeting of 06-20-2023 1246 of 1523
3 I. Policy
CONTRACTOR SAFETY PROGRAM
The purpose of this Contractor Safety Program (“CSP”) is to ensure, as best as reasonably possible, the protection and safety of all persons and property during construction activities undertaken by private contractors on behalf of the City of Redlands (“City”). The City has a comprehensive and structured approach in outsourcing services performed on City facilities by third-party persons and entities (“Contractor(s)”). The first phase of this comprehensive approach includes actively screening Contractors based on safety records, safety performance, and safety compliance. After the qualified Contractor is awarded a contract, the Contractor must then ensure compliance with all local, state, federal and Cal/OSHA regulations applicable to the contracted scope of work, and requirements set forth within this CSP. The Contractor, its agents, and personnel must adhere to the policies and procedures set forth by this CSP and all applicable laws and regulations.
II. Authority
California Code of Regulations, Title 8, Section 336.10 “Determination of Citable Employer” California Code of Regulations, Title 8
“Greenbook” Standard Specifications for Public Works Construction Redlands Municipal Code
California Building Code
III. Scope
This CSP applies to all Contractors who provide or render construction or improvement services for Cityowned property and facilities.
The Contractor services covered under this CSP include, but are not limited to, the following:
A. New construction;
B. Remodeling;
C. Facility maintenance orrepair;
D. Equipment installation or maintenance; and
E. Services (i.e. janitorial, fleet operations, landscaping,etc.) Consultants/ Professional service providers are exempt from having to submit a Safety Prequalification Questionnaire (“SPQ”), prior to the beginning of work, but they are expected to be compliant with industry best practices with regards to maintaining a safe work environment for their employees and others.
IV. Definitions
A. Contract – any written agreement between the City of Redlands and a Contractor, to perform a specified scope of work on City facilities. With respect to this policy, a contract includes, but is not limited to: awarded purchase orders, bids, and/ or project contracts.
B. Construction Work – construction, alteration, and/or repair, including painting anddecorating.
C. Contractor – a person or entity (including all personnel) awarded a contract to perform work on City property or facilities.
D. D.A.R.T Rate – Injuries and illnesses severe enough to warrant: Days Away, Restrictions and Transfers. The DART rate is calculated using the following formula: Number of OSHA Recordable injuries and illnesses that resulted in Days Away x 200,000/divided by total hours worked by all employees during the year covered.
Redlands Regular Meeting of 06-20-2023 1247 of 1523
4 E. Designated Work Area – an area where it is necessary to restrict or limit entry or access of nonessential personnel or the public. Examples include work areas involving remediation abatement, demolition, excavation, and overheadlifting.
F. Facilities – any building or property owned by the City of Redlands.
G. Hazard – source or situation with a potential for harm in terms of injury or health, damage to property, damage to workplace environment, or a combination ofthese.
H. Job Hazard Analysis (“JHA”) – a technique that focuses on job tasks as a way to identify hazards before they occur. It focuses on the relationship between the worker, the task, the tools, and the work environment. The objective is to eliminate the risk or to utilize control measures to reduce the risk.
I. North American Industry Classification System (“NAICS”) – is the standard used by Federal statistical agencies in classifying business establishments for the purpose of collecting, analyzing, and publishing statistical data related to the U.S. businesseconomy.
J. Non-compliance – any deviation from standards, practices, processes, procedures, regulations etc. that could either directly or indirectly lead to injury or illness, property damage, damage to the workplace environment, or any combination of thesecriteria.
K. Notice of non-compliance – form provided to the Contractor by the City alerting the contractor of non-compliance with City specifications, Cal/OSHA regulations, or any other generally accepted safe work practice.
L. Non-compliant hazardous work condition – any hazard that is considered to be non-compliant with State or Federal safety and health regulations, City specifications, or any inconsistency with generally accepted work practices.
M. Personnel – all Contractor employees, contractors, sub-contractors and agents providedaccess to City property or facilities.
N. Recordable Incident – any injury or illness resulting in death, days away from work, restricted work or transfer to another job, medical treatment beyond first aid, or loss of consciousness per OSHA Section 1904.7(a).
O. Safety Tailgate – informal safety meeting generally conducted at the job site prior to the commencement of a job or work shift.
P. Services – any and all, labor, duties, functions and activities required to be performed by the Contractor under the contract and any subsequent addenda.
V. Responsibilities
RISK MANAGEMENT
A. Update, maintain, and administer this CSP;
B. Maintain centralized records of training, site visit data, written programs, tailgate meetings, permits, and all other necessary contractor relateddocumentation;
C. Provide technical assistance to Engineeringpersonnel; D. Attend Pre-construction meetings and progress meetings asneeded; E. Provide assistance on safety inspections as needed;
F. Review safety submittals;
G. Provide guidance on pre-qualification determination; and H. Provide training to affected city personnel with responsibilities under thisprogram.
Redlands Regular Meeting of 06-20-2023 1248 of 1523
5 PROJECT MANAGER (CITY)
The Project Manager has the authority to delegate any or all portions of this CSP to subordinates, but the Project Manager will be held accountable for their compliance. The Project Manager shall contact Risk Management, as necessary, for assistance in relation to this CSP.
A. Ensure safety hazards are addressed in a timelymanner; B. Communicate safety concerns during pre-construction meetings and progressmeetings; C. Inform impacted employees of construction activities scheduled in their workarea; D. Enforce pre-qualification procedures in bidding process; and E. Ensure this CSP is properly executed.
INSPECTOR (CITY)
The City of Redlands construction inspector is not a safety professional and will only provide “Notice of NonCompliance” for obvious and serious non-compliant conditions.
A. To the best of their abilities, inspect work sites for safetyhazards; B. Communicate safety concerns to Contractor;
C. Provide Contractor with “Notice of Non-Compliance” when serious conditions occur or repeatviolations; D. Collect documentation needed for construction worksites; E. Submit documentation to Risk Management forrecordkeeping; F. Maintain photo documentation of safety hazards;
G. Never enter situations that can harm or endanger himself/herself; H. Never use personal protective equipment (PPE) or enter situations, which they are not trainedfor; I. Contact Emergency Medical Services (911) and Risk Management in case of emergency;and J. Attend and communicate safety concerns in progressmeetings.
EMPLOYEES (CITY)
A. Immediately notify the Project Manager, inspector, or Risk Management of any safety related concerns at a Contractor job site; and
B. Contact Emergency Medical Services (911) and Risk Management in case ofemergency.
CONTRACTOR
Where relevant and applicable, the Contractor’s responsibilities shall include:
A. Compliance with requirements and responsibilities detailed within the Contractor Safety Program; B. Ensure all local regulatory requirements are met and all necessary permits are obtained before conducting work on behalf of the City;
C. Designate a Project Safety Official by name who shall be available at all times to abate safety hazards; D. Ensure all personnel have the appropriate qualifications and training to perform the contracted work (Copies of current training documentation and certifications must be on file with theCity); E. Inform City Project Manager or inspector of any job site safety hazards orconcerns; F. Inform City Project Manager if any suspected asbestos-containing material islocated; G. Conduct and submit Job Hazard Analysis (JHA) before work and as required by change of tasks; H. Conduct and submit Safety Tailgates on a bi-weekly basis; I. Provide all required PPE necessary to conduct work safely and in accordance with required local regulations;
J. The safety of all individuals who enter work site;
K. Spill cleanup;
L. Immediately report any incidents, accidents, near misses, unsafe conditions, or unsafe acts involving any jobsite personnel;
Redlands Regular Meeting of 06-20-2023 1249 of 1523
6 M. Arrange for the proper storage and removal of waste generated prior to the completion of job, and provide confirmation that the materials have been removed or disposed of in a manner compliant with all applicable environmental regulations;
N. Removing all equipment used during work activities and ensuring proper housekeeping of designated work area at the end of each workday and upon completion of the job; O. Contact Emergency Services (911) and Project Manager in the event of an emergency; and P. For the actions of their subcontractors, as they may pertain to this CSP, including their adherence to its contents and review of this document.
PROJECT SAFETY OFFICIAL (CONTRACTOR)
A. Shall be at the work site at all times;
B. Must be thoroughly familiar with the Contractor’s Injury and Illness Prevention Program (IIPP) and Code of Safe Practices;
C. Shall be available at all times to abate any potential safety hazards;and D. Shall have the authority and responsibility to shut down an unsafe operation, if necessary.
VI. Program
SAFETY PREQUALIFICATION PROCESS
A. The safety prequalification process is intended to:
• Provide the City with knowledge of past and current safety performance of Contractors working on City construction projects;
• Improve Contractor compliance with City safety rules, including safe work practices required by applicable regulations and laws; and
• Improve safety during Contractor activities.
B. A copy of the SPQ shall be provided to each person or entity bidding on a project, as part of the bidding process.
C. The completed questionnaire shall be returned and reviewed prior to awarding contract work, with supporting information provided as indicated by responses onquestionnaire.
D. The SPQ shall be submitted to: 35 Cajon St., Suite 4 Redlands Ca, 92373
Attention: Project Name-Contractor Name-SPQ
E. The following criteria and information relating to the Contractor will be reviewed prior to awarding contract:
• Contractor License;
• Incident Rates;
• OSHA Citations;
• Safety Policies;
• Safety Programs and Procedures;
• Compliance History on City Projects; and
• Certification Statement.