Cities Index.
Agenda packet

Redlands City Council
September 3, 2024

Document
Agenda packet
Meeting
September 3, 2024
Body
Redlands City Council
Pages
55
Original file
226.0 MB
Text extracted from the city's file for reading and search. Open the original on s3.us-west-004.backblazeb2.com. That file is the official record.

3. M ore frequent inspections w ill be im plem ented in the beginning of the project; and

4. W hen the C ontractor has never w orked for the C ity.

TRAIN IN G/DOC U M EN TATION
A. C ontractor w ill ensure that all personnel are properly trained for the scope of w ork they are assigned, as w ell as the equipm ent they w ill be utilizing.

B. Docum entation shall be on file w ith the C ity prior to project start.

C. Personnel missing training docum entation shall not be perm itted to w ork on aw arded C ity projects.

D. Training requirem ents are m andated by Federal and State Regulations. This m ay include, but is not limited, to the program s listed in the SPQ .

N ON -C OM PLIAN C E
A. C ontractor com pliance issues shall be docum ented on the “N otice of N on-C om pliance” form . A copy of this form shall be provided to C ontractor for com pletion.

B. U pon receipt of the com pleted “N otice of N on-C om pliance” form , the Project M anager and Risk M anagem ent w ill evaluate, based on the incident, and identify, as appropriate, any additional corrective and/or preventive actions for com pletion.

C. If im m ediate correction is not feasible, the project w ill be tem porarily stopped until the issue is adequately resolved.

D. City staff w ith authority to stop w ork are:

1. C onstruction Inspector;

2. City Project M anager;

3. City M anager; and

4. Risk M anagem ent staff.

E. Any violation or deviation from safety rules, procedures, or regulations, based on evaluation, m ay be subject to any and all disciplinary actions listed as follow s:

1. Verbal w arning

2. W ritten w arning-N otice of N on-C om pliance (w ork m ay not continue until approved corrections are im plem ented);

3. Dism issal of non-com plying personnel; and/or

4. Term ination of C ontract.

The City of Redlands m aintains the right to term inate any contract for the violation of safety issues w ithout liability to the City.

C ITY PERSON N EL
A. All affected C ity em ployees w ill be inform ed in advance of any construction related w ork or other contract w ork w hich has the potential for im pacting their w orkplace. N otifications w ill be m ade to all affected em ployees via e-m ail or w ritten m em o by the Project M anager or designee. N otifications m ust include the follow ing inform ation:

1. Start and end dates of the w ork to be com pleted;

2. W ork areas to be affected;
Redlands Regular Meeting of 09-03-24 1836 of 1977

3. Description of w ork to be com pleted;

4. N am e and phone num ber of Project M anager;

5. N am e and phone num ber of C onstruction Inspector; and

6. N am e and phone num ber of Risk M anagem ent.

B. Em ployees should be instructed to notify Project M anager regarding logistical issues or other concerns.

Safety and Health concerns should be directed to either the Project M anager, Inspector, or Safety Specialist.

VII. Recordkeeping
The C ity’s Hum an Resources / Risk M anagem ent Departm ent w ill m aintain all records prepared in association w ith this C SP, with copies also place on file w ith the office of the C ity C lerk.

VIII. Additional References
https://w w w .dir.ca.gov/title8/336_10.htm l
Redlands Regular Meeting of 09-03-24 1837 of 1977
11 City of Redlands
Acknow ledgm ent of Receipt Statem ent
I acknow ledge by signing this docum ent, that I have received and review ed the C ity of Redlands’ C ontractor Safety Program and understand that it contains im portant inform ation on the C ity’s policies and procedures regarding em ployee safety as it pertains to C ontractor activities. Furtherm ore, I acknow ledge that failure to com ply w ith any of these procedures m ay lead to term ination of the contract w ith the C ity.
____________________________ ______________________________ C ontractor Signature C ontractor Title:
______________________________________ ________________________________________ C ontractor N am e (Print) Date Signed
If you have any questions regarding this docum ent, please contact the Risk M anagem ent Division at (909) 798-7514.

Attachm ent A
Redlands Regular Meeting of 09-03-24 1838 of 1977
12 CITY O F RED LAN D S

SAFETY PREQ U ALIFICATIO N Q U ESTIO N N AIRE
SECTIO N 1 – G EN ERAL IN FO RM ATIO N
C om pany N am e:

C ontractor License #: Expiration Date:

Address:

City: State: Zip C ode:

N am e of Person Subm itting Application:

Title: Telephone #:

Em ail Address:

Identify the highest ranking Safety/Health Professional in your C om pany:

N am e:

Title: Telephone #:

Om itting or reporting false inform ation on this questionnaire m ay result in disqualification of bid.

The City of Redlands reserves the right to conduct random or for-cause audits of inform ation stated in this questionnaire. If deem ed necessary, additional docum entation m ay be requested by the City to verify responses on this questionnaire.

Attachm ent B
Redlands Regular Meeting of 09-03-24 1839 of 1977
13 SECTIO N 2 – IN CID EN T RATES & W O RKER’S CO M PEN SATIO N IN FO RM ATIO N

IN CID EN T RATES
Provide your actual injury and illness data below :

Provide the N AIC S C ode N um ber that best represents your Firm :_____________________________
Provide any additional num bers here:
______________________________________
(Provide three full years of data) Last C alendar 2 Years Ago 3 Years Ago

N um ber of hours w orked by all em ployees:

Total Recordable Incident Rate*:

D.A.R.T. Rate*:

Total N um ber of Fatalities:

Incident Rate = [(Total Recordable C ases X 200,000 hours)/ N um ber of hours w orked by all em ployees] D.A.R.T.Rate = [(Total N um ber of entries for Days Aw ay, Restricted and Job Transfer X 200,000 hours)/ N um ber of hours w orked by all em ployees]
If your latest incident rates and D.A.R.T. rates are greater than 100% of the industry average for all your N AIC S code N um bers Listed, your bid m ay be disqualified.

The industry average can be found at www.bls.gov
W O RKERS’ CO M PEN SATIO N IN FO RM ATIO N

1. Provide your W orkers’ Com pensation Experience M odification Rate (EM R) Data:

Policy Year EM R
* If your current EM R is greater than 1.25, initialing here certifies that you w ill provide a com petent, full- tim e person or representative responsible for safety for all City projects:____________
C urrent EM R*
* lnitialing here certifies that your firm does not have an EM R:___________ (Subm it a copy of your firm 's Loss Run Reports for the last three years if your firm does not have an EM R.)
1 Year Ago:
2 Years Ago: N am e of your firm ’s W orkers’ C om pensation carrier:
3 Years Ago: Phone N um ber of W orkers’ C om pensation carrier

2. Is your firm self-insured for W orkers' Com pensation claim s? Yes ˆ N o ˆ (If yes, please attach a copy of the latest Annual Report to the State of C alifornia Departm ent of Industrial Relations and/or State of C alifornia C ertificate of Self-Insurance.) SECTIO N 3– CITATIO N H ISTO RY

1. Has your firm received any regulatory citations in the last three years? Yes ˆ N o ˆ If yes, please answ er the question below .

Redlands Regular Meeting of 09-03-24 1840 of 1977
14 2. W ere any of the confirm ed (C losed) citations classified as Serious, Willful, Repeat, or Failure to abate?
Yes ˆ N o ˆ

3. If yes, please explain:

4. Have you abated all of the citations issued to you in the last three years Yes ˆ N o ˆ If no, please explain abatem ent action plan:

SECTIO N 4 – SAFETY PO LICIES
Q uestions (Please check YES or N O ) YES N O *

1. Does your com pany provide and adhere to a w ritten Illness Prevention Program (IIPP) (C C R Title 8 §3203(a))? If yes, a copy of the program w ill be required on-hand at the job site throughout the duration of the contract. Please attach a copy to your bid proposal. † †

2. Does your com pany provide and conduct Tailgate M eetings, or equivalent w ith em ployees at least every 10 w orking days. (C C R Title 8 §1509(e))
† †

3. Does your com pany have a policy for disciplinary action for unsafe behavior ensuring em ployee com pliance with safe and healthy w ork practices? (C C R Title 8 §3203(a)(2)) † †

4. Does your com pany provide and abide by a w ritten C ode of Safe Practices that relates to your firm ’s operations. (C C R Title 8 §1509(b)) If yes, a copy of the C ode of Safe Practices w ill be required on-hand at the job site throughout the duration of the contract. Please attach a copy w ith your bid proposal. † †

5. Does your com pany perform JHAs? (C C R Title 8 §1511(b) † †

6. Does your com pany provide training and retraining program s for ensuring em ployee com pliance w ith safe and healthy w ork practices? (C C R Title 8 §3203 (a)(2), (a)(7) † †

7. Does your com pany provide training and retraining program s for ensuring em ployee com pliance † † *Please provide reason(s) for N O answ er in the box below or on a separate sheet of paper.

Failure to provide the above-referenced docum ents w ill result in the contractor’s bid being disqualified.

SECTIO N 5 – SAFETY PRO G RAM S AN D PRO CED U RES

PLEASE AN SW ER ALL Q U ESTIO N S BY CH ECKIN G YES O R N O , AN D ATTACH IN G APPRO PRIATE D O CU M EN TS TH AT M AY APPLY O R AS REQ U ESTED .

Redlands Regular Meeting of 09-03-24 1841 of 1977
15 YES N O

1. Is Confined Space w ork anticipated in the scope of the w ork aw arded? (If no, please proceed to Q uestion 2) † †
If yes, please attach the follow ing: Attached?
C opy of w ritten C onfined Space Entry Procedure † †
List of personnel authorized on jobsite to w ork in confined space(s) † † List of personnel authorized on jobsite to serve as Rescue Team † † Verification of personnel training (copies of certs, cards, etc.) † †

2. Is w ork requiring Lockout/Tagout protocols anticipated in the scope of the w ork aw arded? (If no, please proceed to Q uestion 3) † †
If yes, please attach the follow ing: Attached?
C opy of w ritten Lockout/Tagout (LOTO) Procedure † †
List of personnel authorized on jobsite to perform LOTO † † Verification of personnel training (copies of certs, cards, etc.) † †

3. Is w ork requiring a personal lift anticipated in the scope of the w ork aw arded? (If no, please proceed to Q uestion 4) † †
If yes, please attach the follow ing: Attached?
List of personnel authorized on jobsite to use lifts † † Verification of personnel training (copies of certs, cards, etc.) † †

4. Is w ork requiring a forklift anticipated in the scope of the w ork aw arded? (If no, please proceed to Q uestion 5) † †
If yes, please attach the follow ing: Attached?
List of personnel authorized on jobsite to use a forklift † † Verification of personnel training (copies of certs, cards, etc.) † †

5. Is w ork requiring a crane anticipated in the scope of the w ork aw arded? (If no, please proceed to Q uestion 6) † †
If yes, please attach the follow ing: Attached?
C opy of w ritten C rane Program † †
C opy of all expected C rane operators’ C ertifications † † List of personnel designated as C om petent under C rane program † † Verification of personnel training (copies of certs, cards, etc.) † † N OTE: If aw arded bid, m ore docum entation m ay be required Redlands Regular Meeting of 09-03-24 1842 of 1977
16 6. Is H ot W ork (as defined by O SH A) anticipated in the scope of the w ork aw arded? (If no, please proceed to Q uestion 7) † †
If yes, please attach the follow ing: Attached?
C opy of w ritten Hot W ork Procedure † †
List of personnel authorized on jobsite to perform Hot W ork † † Verification of personnel training (copies of certs, cards, etc.) † †

7. Is Trenching/ Excavation w ork anticipated in the scope of the w ork aw arded? (If no, proceed to Q uestion 8) † †
Is a plan in place for the disposal of all m aterial that cannot be returned to the trench/ excavation? † † Are appropriate m aterials for barricading or securing w ork area at jobsite? † † Has a perm it from the Departm ent of Industrial Relations for excavations deeper than 5 feet been obtained? † †
If yes, please attach the follow ing: Attached?
C opy of w ritten Trenching/ Excavation Procedure † †
C opy of Perm it if trench is to exceed depth of 5 feet † † List of personnel designated as C om petent under Trenching/ Excavation Program † † Verification of personnel training (copies of certs, cards, etc.) † † N OTE: If aw arded bid, m ore docum entation m ay be required

8. Is electrical w ork anticipated in the scope of the w ork aw arded? (If no, proceed to Q uestion 9) † † If yes, please attach the follow ing: Attached?
C opy of w ritten Electrical Safety Program † †
List of personnel designated as C om petent under Electrical Safety Program † † Verification of personnel training (copies of certs, cards, etc.) † †

9. Is w ork that m ay have an arc flash potential anticipated in the scope of the w ork aw arded? (If no, proceed to Q uestion 10) † †
Are all m aterials required to safely perform arc flash present? † † If yes, please attach the follow ing: Attached?
C opy of Arc Flash Procedure † †
List of personnel designated as C om petent under Arc Flash Program † † Verification of personnel training (copies of certs, cards, etc.) † † Redlands Regular Meeting of 09-03-24 1843 of 1977
17 10. Is w ork involving chem icals anticipated in the scope of the w ork aw arded? (If no, proceed to Q uestion 11)? † †
If yes, please attach the follow ing: Attached?
C opy of w ritten Hearing C onservation Program † †
List of personnel w orking in high noise areas † †
Verification of personnel training (copies of certs, cards, etc.) † †

11. Is w ork involving chem icals anticipated in the scope of the w ork aw arded? (If no, proceed to Q uestion 12)? † †
* C opies of SDS for C hem icals used m ust be kept at jobsite Please attach the follow ing: Attached?
C opy of w ritten Hazard C om m unication Program † †
List of personnel perform ing w ork w ith chem icals † † Verification of personnel training (copies of certs, cards, etc.) † † List trade nam es of all hazardous m aterials w hich you w ill be using on site:

12. Is w ork on or adjacent to public roadw ays anticipated in the scope of the w ork aw arded. (If no, proceed to Q uestion 13) † †
Do you have the appropriate provisions (signs, devices, barricades/) † † Please attach the follow ing: Attached?
Please provide a list of personnel w orking in traffic areas. † † Verification of personnel training (copies of certs, cards, etc.) † † N OTE: If aw arded bid, m ore docum entation m ay be required

13. Is it anticipated in the scope of the w ork aw arded that exposure to asbestos is possible? (If no, proceed to Q uestion 14) † †
Please attach the follow ing: Attached?
C opy of w ritten procedure(s) † †
List of personnel w orking w ith potential exposure to asbestos † † Verification of personnel training (copies of certs, cards, etc.) † † Redlands Regular Meeting of 09-03-24 1844 of 1977
18 14. Is it anticipated in the scope of the w ork aw arded that exposure to silica is possible? (i.e. sandblasting, concrete dem olition, concrete saw cutting, surface grinding, etc.) (If no, proceed to Q uestion 15)
† †
Please attach the follow ing: Attached?
C opy of Silica C ontrol Plan † †
List of personnel w orking w ith potential exposure to silica † † Verification of personnel training (copies of certs, cards, etc.) † †

15. Is w ork at heights anticipated in the scope of the w ork aw arded? (If no, proceed to Q uestion 16) † † Please attach the follow ing: Attached?
C opy of w ritten Fall Protection Program † †
List of personnel designated as C om petent under Fall Protection Program † † Verification of personnel training (copies of certs, cards, etc.) † †

16. Is w ork requiring the use of respirators anticipated in the scope of the w ork aw arded? (If no, proceed to Q uestion 17) † †
Please attach the follow ing: Attached?
C opy of w ritten Respiratory Protection Program † †
List of personnel using respirators † †
Verification of personnel training (copies of certs, cards, etc.) † †

17. If the scope of w ork to be perform ed is not adequately represented by questions (1-16), please list any additional H ealth & Safety concerns below .

SECTIO N 6 – CO M PLIAN CE H ISTO RY O N CITY PRO JECTS In addition to the previous sections, C ontractors that have previously been aw arded w ork by the C ity, will be equally evaluated on their com pliance history in relation to C ity projects.

Redlands Regular Meeting of 09-03-24 1845 of 1977
19 SECTIO N 7 – CERTIFICATIO N STATEM EN T
I C ertify under penalty of perjury that:
a. the inform ation contained herein is true and correct to the best of m y know ledge, and b. no attem pt has been m ade to give false or m isleading inform ation or to w ithhold any inform ation.

Signature of Authorized Representative: Title of Authorized Representative Printed N am e of Authorized Representative Date Signed:

Redlands Regular Meeting of 09-03-24 1846 of 1977
20 N O TICE O F N O N -CO M PLIAN CE
Project:

C ontractor:

N otice of N on-C om pliance w as issued to C ontractor’s representative, , N am e
on at .

The follow ing unsafe behaviors w ere observed at the C ontractor’s job site:

If the unsafe condition is not im m ediately corrected, the C ity of Redlands m ay take disciplinary action in accordance w ith the C ontractor Safety Program guidelines. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ To be com pleted by C ontractor
C orrective action plan to abate hazards:

U nsafe C ondition Resolved: Date: Tim e:

Rem arks:

Attachm ent C
Redlands Regular Meeting of 09-03-24 1847 of 1977
21 Job H azard Analysis
Signatures of Em ployees On-Site this JHA is applicable to:

Project:

C om pany: Project Safety Official: Project M anager (C ity):

Scope of W ork: Location: Date:

Tasks Potential Safety
Risks/Hazards
Safety
C ontrols/M itigat
Required PPE
Hard Hat
Safety Vest
Safety Glasses/Goggles
Safety Boots
Respirator
Safety Gloves
Face Shield
Fall Protection
Other:

Em ployee Signature: Print N am e: D ate:

Attachm ent D
Redlands Regular Meeting of 09-03-24 1848 of 1977
22 IN CID EN T IN VESTIG ATIO N FO RM
Date of Incident: Tim e of Incident: Date Reported:

Lead Investigator: C ontact Inform ation:

C ontractor: Em ployee N am e:

Witness 1 N am e: Telephone:

Witness 2 N am e: Telephone:

Incident Site/ Location
Incident Sum m ary:

N ear M iss Yes N o Incident Severity: M inor Significant M ajor C ritical Root C ause(s):

C orrective Actions:

Attachm ent E
Redlands Regular Meeting of 09-03-24 1849 of 1977

APPENDIX D
FHWA-1273

Redlands Regular Meeting of 09-03-24 1850 of 1977

THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 09-03-24 1851 of 1977
Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language
EXHIBIT 12-G REQUIRED FEDERAL-AID CONTRACT LANGUAGE
(For Local Assistance Construction Projects)
The following language must be incorporated into all Local Assistance Federal-aid construction contracts.

The following language, with minor edits, was taken from the Code of Federal Regulations.

MAINTAIN RECORDS AND SUBMIT REPORTS DOCUMENTING YOUR PERFORMANCE UNDER THIS

SECTION

1. DISADVANTAGED BUSINESS ENTERPRISES (DBE) ................................................................................ 2 A. NONDISCRIMINATION STATEMENT.............................................................................................. 2 B. CONTRACT ASSURANCE............................................................................................................... 3 C. PROMPT PROGRESS PAYMENT ................................................................................................... 3 D. PROMPT PAYMENT OF WITHHELD FUNDS TO SUBCONTRACTORS ...................................... 3 E. TERMINATION AND SUBSTITUTION OF DBE SUBCONTRACTORS.......................................... 4 F. COMMITMENT AND UTILIZATION ................................................................................................. 5 G. DBE RUNNING TALLY OF ATTAINMENTS ................................................................................... 6

2. BID OPENING ................................................................................................................................................ 6

3. BID RIGGING ................................................................................................................................................. 6

4. CONTRACT AWARD ..................................................................................................................................... 6

5. CONTRACTOR LICENSE.............................................................................................................................. 6

6. CHANGED CONDITIONS .............................................................................................................................. 6 A. DIFFERING SITE CONDITIONS....................................................................................................... 6 B. SUSPENSIONS OF WORK ORDERED BY THE ENGINEER ......................................................... 6 C. SIGNIFICANT CHANGES IN THE CHARACTER OF WORK.......................................................... 7

7. BEGINNING OF WORK, TIME OF COMPLETION AND LIQUIDATED DAMAGES...................................... 7

8. BUY AMERICA............................................................................................................................................... 7

9. QUALITY ASSURANCE................................................................................................................................. 8

10. PROMPT PAYMENT FROM THE AGENCY TO THE CONTRACTORS........................................................ 8

11. FORM FHWA-1273 REQUIRED CONTRACT PROVISIONS FEDERAL-AID CONTRACTS....................... 8

12. FEMALE AND MINORITY GOALS .............................................................................................................. 21

13. TITLE VI ASSURANCES.............................................................................................................................. 22

14. USE OF UNITED STATES-FLAG VESSELS (CARGO PREFERENCE ACT)............................................. 23

15. FEDERAL TRAINEE PROGRAM................................................................................................................. 23

Page 1 of 25 ends

January 2021
Redlands Regular Meeting of 09-03-24 1852 of 1977
Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language

1. DISADVANTAGED BUSINESS ENTERPRISES (DBE)
The contractor, subrecipient or subcontractor shall take necessary and reasonable steps to ensure that DBEs have opportunity to participate in the contract (49 CFR 26). To ensure equal participation of DBEs provided in 49 CFR 26.5, the Agency shows a contract goal for DBEs. The prime contractor shall make work available to DBEs and select work parts consistent with available DBE subcontractors and suppliers.

The prime contractor shall meet the DBE goal shown elsewhere in these special provisions or demonstrate that they made adequate good faith efforts to meet this goal.

It is the prime contractor’s responsibility to verify that the DBE firm is certified as DBE at date of bid opening and document the record by printing out the California Unified Certification Program (CUCP) data for each DBE firm. A list of DBEs certified by the CUCP can be found here.

All DBE participation will count toward the California Department of Transportation’s federally mandated statewide overall DBE goal.

Credit for materials or supplies the prime contractor purchases from DBEs counts towards the goal in the following manner:
x 100 percent counts if the materials or supplies are obtained from a DBE manufacturer. x 60 percent counts if the materials or supplies are obtained from a DBE regular dealer. x Only fees, commissions, and charges for assistance in the procurement and delivery of materials or supplies count if obtained from a DBE that is neither a manufacturer nor regular dealer. 49 CFR

26.55 defines "manufacturer" and "regular dealer."
The prime contractor receives credit towards the goal if they employ a DBE trucking company that performs a commercially useful function as defined in 49 CFR 26.55(d)(1) as follows:
x The DBE must be responsible for the management and supervision of the entire trucking operation for which it is responsible on a particular contract, and there cannot be a contrived arrangement for the purpose of meeting DBE goals.
x The DBE must itself own and operate at least one fully licensed, insured, and operational truck used on the contract.
x The DBE receives credit for the total value of the transportation services it provides on the Contract using trucks it owns, insures, and operates using drivers it employs. x The DBE may lease trucks from another DBE firm, including an owner-operator who is certified as a DBE. The DBE who leases trucks from another DBE receives credit for the total value of the transportation services the lessee DBE provides on the Contract. x The DBE may lease trucks without drivers from a non-DBE truck leasing company. If the DBE leases trucks from a non-DBE truck leasing company and uses its own employees as drivers, it is entitled to credit for the total value of these hauling services. x A lease must indicate that the DBE has exclusive use of and control over the truck. This does not preclude the leased truck from working for others during the term of the lease with the consent of the DBE, so long as the lease gives the DBE absolute priority for use of the leased truck. Leased trucks must display the name and identification number of the DBE. a. Nondiscrimination Statement
The contractor, subrecipient or subcontractor will never exclude any person from participation in, deny any person the benefits of, or otherwise discriminate against anyone in connection with the award and performance of any contract covered by 49 CFR 26 on the basis of race, color, sex, or national origin. In administering the Local Agency components of the DBE Program Plan, the contractor, subrecipient or subcontractor will not, directly, or through contractual or other arrangements, use criteria or methods of administration that have the effect of defeating or substantially impairing accomplishment of the objectives of the DBE Program Plan with respect to individuals of a particular race, color, sex, or national origin.

Page 2 of 25 ends

January 2021
Redlands Regular Meeting of 09-03-24 1853 of 1977
Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language
b. Contract Assurance
Under 49 CFR 26.13(b):

The contractor, subrecipient or subcontractor shall not discriminate on the basis of race, color, national origin, or sex in the performance of this contract. The contractor shall carry out applicable requirements of 49 CFR 26 in the award and administration of federal-aid contracts. Failure by the contractor to carry out these requirements is a material breach of this contract, which may result in the termination of this contract or such other remedy as the recipient deems appropriate, which may include, but is not limited to:
(1) Withholding monthly progress payments;
(2) Assessing sanctions;
(3) Liquidated damages; and/or
(4) Disqualifying the contractor from future bidding as non-responsible. c. Prompt Progress Payment
The prime contractor or subcontractor shall pay to any subcontractor, not later than seven days after receipt of each progress payment, unless otherwise agreed to in writing, the respective amounts allowed the contractor on account of the work performed by the subcontractors, to the extent of each subcontractor’s interest therein. In the event that there is a good faith dispute over all or any portion of the amount due on a progress payment from the prime contractor or subcontractor to a subcontractor, the prime contractor or subcontractor may withhold no more than 150 percent of the disputed amount. Any violation of this requirement shall constitute a cause for disciplinary action and shall subject the licensee to a penalty, payable to the subcontractor, of 2 percent of the amount due per month for every month that payment is not made.

In any action for the collection of funds wrongfully withheld, the prevailing party shall be entitled to his or her attorney’s fees and costs. The sanctions authorized under this requirement shall be separate from, and in addition to, all other remedies, either civil, administrative, or criminal. This clause applies to both DBE and non-DBE subcontractors.
d. Prompt Payment of Withheld Funds to Subcontractors
The Agency may hold retainage from the prime contractor and shall make prompt and regular incremental acceptances of portions, as determined by the Agency, of the contract work, and pay retainage to the prime contractor based on these acceptances. The Agency shall designate one of the methods below in the contract to ensure prompt and full payment of any retainage kept by the prime contractor or subcontractor to a subcontractor. The Agency shall include either Method 1, Method 2, or Method 3 below and delete the other two.

Method 1: No retainage will be held by the Agency from progress payments due to the prime contractor.

Prime contractors and subcontractors are prohibited from holding retainage from subcontractors. Any delay or postponement of payment may take place only for good cause and with the Agency’s prior written approval. Any violation of these provisions shall subject the violating contractor or subcontractor to the penalties, sanctions, and other remedies specified in Section 7108.5 of the California Business and Professions Code and Section 10262 of the California Public Contract Code. This requirement shall not be construed to limit or impair any contractual, administrative or judicial remedies, otherwise available to the contractor or subcontractor in the event of a dispute involving late payment or nonpayment by the contractor, deficient subcontractor performance and/or noncompliance by a subcontractor. This clause applies to both DBE and non-DBE subcontractors.

Method 2: No retainage will be held by the Agency from progress payments due to the prime contractor.

Any retainage kept by the prime contractor or by a subcontractor must be paid in full to the earning subcontractor within seven (7) days after the subcontractor’s work is satisfactorily completed. Any delay or postponement of payment may take place only for good cause and with the Agency’s prior written approval. Any violation of these provisions shall subject the violating contractor or subcontractor to the penalties, sanctions, and remedies specified in Section 7108.5 of the California Business and Professions Code and Section 10262 of the California Public Contract Code. This requirement shall not be construed to limit or impair any contractual, administrative or judicial remedies, otherwise available to the contractor or subcontractor in the event of a dispute involving late payment or nonpayment by the contractor, deficient subcontractor performance and/or noncompliance by a subcontractor. This clause applies to both DBE and non-DBE subcontractors.

Page 3 of 25 ends

January 2021
Redlands Regular Meeting of 09-03-24 1854 of 1977
Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language
Method 3: The Agency shall hold retainage from the prime contractor and shall make prompt and regular incremental acceptances of portions, as determined by the Agency of the contract work and pay retainage to the prime contractor based on these acceptances. The prime contractor or subcontractor shall return all monies withheld in retention from all subcontractors within seven (7) days after receiving payment for work satisfactorily completed and accepted including incremental acceptances of portions of the contract work by the Agency. Any delay or postponement of payment may take place only for good cause and with the Agency’s prior written approval. Any violation of these provisions shall subject the violating prime contractor or subcontractor to the penalties, sanctions, and other remedies specified in Section 7108.5 of the California Business and Professions Code and Section 10262 of the California Public Contract Code. This requirement shall not be construed to limit or impair any contractual, administrative or judicial remedies otherwise available to the contractor or subcontractor in the event of a dispute involving late payment or nonpayment by the contractor; deficient subcontractor performance and/or noncompliance by a subcontractor. This clause applies to both DBE and non-DBE subcontractors.

Any violation of these provisions shall subject the violating prime contractor or subcontractor to the penalties, sanctions and other remedies specified therein. These requirements shall not be construed to limit or impair any contractual, administrative, or judicial remedies otherwise available to the prime contractor or subcontractor in the event of a dispute involving late payment or nonpayment by the prime contractor, deficient subcontract performance, or noncompliance by a subcontractor. e. Termination and Substitution of DBE Subcontractors
The prime contractor shall utilize the specific DBEs listed to perform the work and supply the materials for which each is listed unless the contractor obtains the Agency’s written consent. The prime contractor shall not terminate or substitute a listed DBE for convenience and perform the work with their own forces or obtain materials from other sources without prior written authorization from the Agency. Unless the Agency’s prior written consent is provided, the contractor shall not be entitled to any payment for work or material unless it is performed or supplied by the listed DBE on the Exhibit 15-G Construction Contract DBE Commitment form, included in the Bid.

The Agency authorizes a request to use other forces or sources of materials if the bidder shows any of the following justifications:

1. Listed DBE fails or refuses to execute a written contract based on plans and specifications for the project.

2. The Local Agency stipulated that a bond is a condition of executing the subcontract and the listed DBE fails to meet the Local Agency’s bond requirements.

3. Work requires a contractor's license and listed DBE does not have a valid license under Contractors License Law.

4. Listed DBE fails or refuses to perform the work or furnish the listed materials (failing or refusing to perform is not an allowable reason to remove a DBE if the failure or refusal is a result of bad faith or discrimination).

5. Listed DBE's work is unsatisfactory and not in compliance with the contract.

6. Listed DBE is ineligible to work on the project because of suspension or debarment.

7. Listed DBE becomes bankrupt or insolvent.

8. Listed DBE voluntarily withdraws with written notice from the Contract

9. Listed DBE is ineligible to receive credit for the type of work required.

10. Listed DBE owner dies or becomes disabled resulting in the inability to perform the work on the Contract.

11. The Agency determines other documented good cause.

The prime contractor shall notify the original DBE of the intent to use other forces or material sources and provide the reasons, allowing the DBE 5 days to respond to the notice and advise the prime contractor and the Agency of the reasons why the use of other forces or sources of materials should not occur.

Page 4 of 25 ends

January 2021
Redlands Regular Meeting of 09-03-24 1855 of 1977
Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language
The prime contractor’s request to use other forces or material sources must include:

1. One or more of the reasons listed in the preceding paragraph.

2. Notices from the prime contractor to the DBE regarding the request.

3. Notices from the DBEs to the prime contractor regarding the request.

If a listed DBE is terminated or substituted, the prime contractor must make good faith efforts to find another DBE to substitute for the original DBE. The substitute DBE must perform at least the same amount of work as the original DBE under the contract to the extent needed to meet or exceed the DBE goal. f. Commitment and Utilization
Note: In the Agency’s reports of DBE participation to Caltrans, the Agency must display both commitments and attainments.

The Agency’s DBE program must include a monitoring and enforcement mechanism to ensure that DBE commitments reconcile to DBE utilization.

The bidder shall submit the Exhibit 15-G Construction Contract DBE Commitment, included in the Bid book.

This exhibit is the bidder’s DBE commitment form. If the form is not submitted with the bid, the bidder must remove the form from the Bid book before submitting their bid.

The bidder shall complete and sign Exhibit 15-G Construction Contract DBE Commitment included in the contract documents regardless of whether DBE participation is reported. The bidder shall provide written confirmation from each DBE that the DBE is participating in the Contract. A copy of a DBE's quote serves as written confirmation. If a DBE is participating as a joint venture partner, the bidder shall submit a copy of the joint venture agreement.

If the DBE Commitment form, Exhibit 15-G, is not submitted with the bid, it must be completed and submitted by all bidders to the Agency within five (5) days of bid opening. If the bidder does not submit the DBE Commitment form within the specified time, the Agency will find the bidder’s bid nonresponsive.

The prime contractor shall use each DBE subcontractor as listed on Exhibit 12-B Bidder’s List of Subcontractors (DBE and Non-DBE), and Exhibit 15-G Construction Contract DBE Commitment form unless they receive authorization for a substitution.

The Agency shall request the prime contractor to:

1. Notify the Resident Engineer or Inspector of any changes to its anticipated DBE participation

2. Provide this notification before starting the affected work

3. Maintain records including:
x Name and business address of each 1st-tier subcontractor x Name and business address of each DBE subcontractor, DBE vendor, and DBEtrucking company, regardless of tier
x Date of payment and total amount paid to each business (see Exhibit 9-F Monthly Disadvantaged Business Enterprise Payment)
If the prime contractor is a DBE contractor, they shall include the date of work performed by their own forces and the corresponding value of the work.

Before the 15th of each month, the prime contractor shall submit a Monthly DBE Trucking Verification (LAPM Exhibit 16-Z1) form.

If a DBE is decertified before completing its work, the DBE must notify the prime contractor in writing of the decertification date. If a business becomes a certified DBE before completing its work, the business must notify the prime contractor in writing of the certification date. The prime contractor shall submit the notifications. Upon work completion, the prime contractor shall complete a Disadvantaged Business Enterprises (DBE) Certification Status Change, Exhibit 17-O, form and submit the form within 30 days of contract acceptance.

Page 5 of 25 ends

January 2021
Redlands Regular Meeting of 09-03-24 1856 of 1977
Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language
Upon work completion, the prime contractor shall complete Exhibit 17-F Final Report – Utilization of Disadvantaged Business Enterprises (DBE), First-Tier Subcontractors and submit it within 90 days of contract acceptance. The Agency will withhold $10,000 until the form is submitted. The Agency releases the withhold upon submission of the completed form.
g. DBE RUNNING TALLY OF ATTAINMENTS
After submitting an invoice for reimbursement that includes a payment to a DBE, but no later than the 10th of the following month, the prime contractor/consultant shall complete and email the Exhibit 9- F: Disadvantaged Business Enterprise Running Tally of Payments to [email protected] with a copy to the Agency.

2. BID OPENINGThe Agency publicly opens and reads bids at the time and place shown on the Notice to Contractors.

3. BID RIGGING The U.S. Department of Transportation (DOT) provides a toll-free hotline to report bid rigging activities. Use the hotline to report bid rigging, bidder collusion, and other fraudulent activities. The hotline number is (800) 424-9071. The service is available 24 hours 7 days a week and is confidential and anonymous. The hotline is part of the DOT's effort to identify and investigate highway construction contract fraud and abuse and is operated under the direction of the DOT Inspector General.

4. CONTRACT AWARD If the Agency awards the contract, the award is made to the lowest responsible and responsive bidder.

5. CONTRACTOR LICENSE
The Contractor must be properly licensed as a contractor from contract award through Contract acceptance (Public Contract Code § 10164).

6. CHANGED CONDITIONS
a. Differing Site Conditions

1. During the progress of the work, if subsurface or latent physical conditions are encountered at the site differing materially from those indicated in the contract or if unknown physical conditions of an unusual nature, differing materially from those ordinarily encountered and generally recognized as inherent in the work provided for in the contract, are encountered at the site, the party discovering such conditions shall promptly notify the other party in writing of the specific differing conditions before the site is disturbed and before the affected work is performed.

2. Upon written notification, the engineer will investigate the conditions, and if it is determined that the conditions materially differ and cause an increase or decrease in the cost or time required for the performance of any work under the contract, an adjustment, excluding anticipated profits, will be made and the contract modified in writing accordingly. The engineer will notify the contractor of the determination whether or not an adjustment of the contract is warranted.

3. No contract adjustment which results in a benefit to the contractor will be allowed unless the contractor has provided the required written notice.

4. No contract adjustment will be allowed under this clause for any effects caused on unchanged work. (This provision may be omitted by the Local Agency, at their option.) b. Suspensions of Work Ordered by the Engineer

1. If the performance of all or any portion of the work is suspended or delayed by the engineer in writing for an unreasonable period of time (not originally anticipated, customary, or inherent to the construction industry) and the contractor believes that additional compensation and/or contract time is due as a result of such suspension or delay, the contractor shall submit to the engineer in writing a request for adjustment within 7 calendar days of receipt of the notice to resume work. The request shall set forth the reasons and support for such adjustment.

2. Upon receipt, the engineer will evaluate the contractor's request. If the engineer agrees that the cost and/or time required for the performance of the contract has increased as a result of such suspension and the suspension was caused by conditions beyond the control of and not the fault of the contractor, its suppliers, or subcontractors at any approved tier, and not caused by weather, the engineer will make an adjustment (excluding profit) and modify the contract in

Page 6 of 25 ends

January 2021
Redlands Regular Meeting of 09-03-24 1857 of 1977
Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language
writing accordingly. The contractor will be notified of the engineer's determination whether or not an adjustment of the contract is warranted.

3. No contract adjustment will be allowed unless the contractor has submitted the request for adjustment within the time prescribed.

4. No contract adjustment will be allowed under this clause to the extent that performance would have been suspended or delayed by any other cause, or for which an adjustment is provided or excluded under any other term or condition of this contract. c. Significant Changes in the Character of Work

1. The engineer reserves the right to make, in writing, at any time during the work, such changes in quantities and such alterations in the work as are necessary to satisfactorily complete the project.

Such changes in quantities and alterations shall not invalidate the contract nor release the surety, and the contractor agrees to perform the work as altered.

2. If the alterations or changes in quantities significantly change the character of the work under the contract, whether such alterations or changes are in themselves significant changes to the character of the work or by affecting other work cause such other work to become significantly different in character, an adjustment, excluding anticipated profit, will be made to the contract.

The basis for the adjustment shall be agreed upon prior to the performance of the work. If a basis cannot be agreed upon, then an adjustment will be made either for or against the contractor in such amount as the engineer may determine to be fair andequitable.

3. If the alterations or changes in quantities do not significantly change the character of the work to be performed under the contract, the altered work will be paid for as provided elsewhere in the contract.

4. The term “significant change” shall be construed to apply only to the following circumstances:
x When the character of the work as altered differs materially in kind or nature from that involved or included in the original proposed construction; or x When a major item of work, as defined elsewhere in the contract, is increased in excess of 125 percent or decreased below 75 percent of the original contract quantity. Any allowance for an increase in quantity shall apply only to that portion in excess of 125 percent of original contract item quantity, or in case of a decrease below 75 percent, to the actual amount of work performed.

7. BEGINNING OF WORK, TIME OF COMPLETION AND LIQUIDATED DAMAGES The Contractor shall begin work within 15 calendar days after the issuance of the Notice to Proceed.

This work shall be diligently prosecuted to completion before the expiration of WORKING DAYS beginning on the fifteenth calendar day after the date shown on the Notice to Proceed.

The Contractor shall pay to the City/County the sum of $ per day, for each and every calendar days’ delay in finishing the work in excess of the number of working days prescribed above.

8. BUY AMERICA
Furnish steel and iron materials to be incorporated into the work with certificates of compliance and certified mill test reports. Mill test reports must indicate where the steel and iron were melted and manufactured. Steel and iron materials must be produced in the U.S. except:

1. Foreign pig iron and processed, pelletized, and reduced iron ore may be used in the domestic production of the steel and iron materials [60 Fed Reg 15478 (03/24/1995)];

2. If the total combined cost of the materials does not exceed the greater of 0.1 percent of the total bid or $2,500, materials produced outside the U.S. may be used.

Production includes:

Page 7 of 25 ends

January 2021
WORKING DAYS 180
Redlands 500
Redlands Regular Meeting of 09-03-24 1858 of 1977
Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language

1. Processing steel and iron materials, including smelting or other processes that alter the physical form or shape (such as rolling, extruding, machining, bending, grinding, and drilling) or chemical composition;

2. Coating application, including epoxy coating, galvanizing, and painting, that protects or enhances the value of steel and iron materials.

9. QUALITY ASSURANCE
The Local Agency uses a Quality Assurance Program (QAP) to ensure a material is produced to comply with the Contract. The Local Agency may examine the records and reports of tests the prime contractor performs if they are available at the job site. Schedule work to allow time for QAP.

10. PROMPT PAYMENT FROM THE AGENCY TO THE CONTRACTORS
The Agency shall make any progress payment within 30 days after receipt of an undisputed and properly submitted payment request from a contractor on a construction contract. If the Agency fails to pay promptly, the Agency shall pay interest to the contractor, which accrues at the rate of 10 percent per annum on the principal amount of a money judgment remaining unsatisfied. Upon receipt of a payment request, the Agency shall act in accordance with both of the following:

1. Each payment request shall be reviewed by the Agency as soon as practicable after receipt for the purpose of determining that it is a proper payment request.

2. Any payment request determined not to be a proper payment request suitable for payment shall be returned to the contractor as soon as practicable, but not later than seven (7) days, after receipt. A request returned pursuant to this paragraph shall be accompanied by a document setting forth in writing the reasons why the payment request is not proper.

11. FORM FHWA-1273 REQUIRED CONTRACT PROVISIONS FEDERAL-AID CONTRACTS (Excluding ATTACHMENT A - EMPLOYMENT AND MATERIALS PREFERENCE FOR APPALACHIAN

DEVELOPMENT HIGHWAY SYSTEM OR APPALACHIAN LOCAL ACCESS ROAD CONTRACTS) [The following 12 pages must be physically inserted into the contract without modification.]

Page 8 of 25 ends

January 2021
Redlands Regular Meeting of 09-03-24 1859 of 1977
Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language
FHWA-1273 -- Revised May 1, 2012

REQUIRED CONTRACT

PROVISIONS FEDERAL-AID

CONSTRUCTION CONTRACTS

Page 9 of 25 ends

January 2021
Redlands Regular Meeting of 09-03-24 1860 of 1977
Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language
I. General
II. Nondiscrimination
III. No segregated Facilities
IV. Davis-Bacon and Related Act Provisions
V. Contract Work Hours and Safety Standards Act Provisions VI. Subletting or Assigning the Contract
VII. Safety: Accident Prevention
VIII. False Statements Concerning Highway Projects
IX. Implementation of Clean Air Act and Federal Water Pollution Control Act
X. Compliance with Government wide Suspension and Debarment Requirements
XI. Certification Regarding Use of Contract Funds for Lobbying

ATTACHMENTS
A. Employment and Materials Preference for Appalachian Development Highway System or Appalachian Local Access Road Contracts (included in Appalachian contracts only)
I. GENERAL

1. Form FHWA-1273 must be physically incorporated in each construction contract funded under Title 23 (excluding emergency contracts solely intended for debris removal). The contractor (or subcontractor) must insert this form in each subcontract and further require its inclusion in all lower tier subcontracts (excluding purchase orders, rental agreements and other agreements for supplies or services).

The applicable requirements of Form FHWA-1273 are incorporated by reference for work done under any purchase order, rental agreement or agreement for other services. The prime contractor shall be responsible for compliance by any subcontractor, lower-tier subcontractor or service provider.

Form FHWA-1273 must be included in all Federal-aid design-build contracts, in all subcontracts and in lower tier subcontracts (excluding subcontracts for design services, purchase orders, rental agreements and other agreements for supplies or services). The design-builder shall be responsible for compliance by any subcontractor, lower-tier subcontractor or service provider.

Contracting agencies may reference Form FHWA-1273 in bid proposal or request for proposal documents, however, the Form FHWA-1273 must be physically incorporated (not referenced) in all contracts, subcontracts and lower-tier subcontracts (excluding purchase orders, rental agreements and other agreements for supplies or services related to a construction contract).

2. Subject to the applicability criteria noted in the following sections, these contract provisions shall apply to all work performed on the contract by the contractor's own organization and with the assistance of workers under the contractor's immediate superintendence and to all work performed on the contract by piecework, station work, or by subcontract.

3. A breach of any of the stipulations contained in these Required Contract Provisions may be sufficient grounds for withholding of progress payments, withholding of final payment, termination of the contract, suspension / debarment or any other action determined to be appropriate by the contracting agency and FHWA.

4. Selection of Labor: During the performance of this contract, the contractor shall not use convict labor for any purpose within the limits of a construction project on a Federal-aid highway unless it is labor performed by convicts who are on parole, supervised release, or probation. The term Federal-aid highway does not include roadways functionally classified as local roads or rural minor collectors.

II. NONDISCRIMINATION
The provisions of this section related to 23 CFR Part 230 are applicable to all Federal-aid construction contracts and to all related construction subcontracts of $10,000 or more. The provisions of 23 CFR Part 230 are not applicable to material supply, engineering, or architectural service contracts.

In addition, the contractor and all subcontractors must comply with the following policies: Executive Order 11246, 41 CFR 60, 29 CFR 1625- 1627, Title 23 USC Section 140, the Rehabilitation Act of 1973, as amended (29 USC 794), Title VI of the Civil Rights Act of 1964, as amended, and related regulations including 49 CFR Parts 21, 26 and 27; and 23 CFR Parts 200, 230, and 633.

The contractor and all subcontractors must comply with: the requirements of the Equal Opportunity Clause in 41 CFR 60-1.4(b) and, for all construction contracts exceeding $10,000, the Standard Federal Equal Employment Opportunity Construction Contract Specifications in 41 CFR 60-4.3.

Note: The U.S. Department of Labor has exclusive authority to determine compliance with Executive Order 11246 and the policies of the Secretary of Labor including 41 CFR 60, and 29 CFR 1625-1627.

The contracting agency and the FHWA have the authority and the responsibility to ensure compliance with Title 23 USC Section 140, the Rehabilitation Act of 1973, as amended (29 USC 794), and Title VI of the Civil Rights Act of 1964, as amended, and related regulations including 49 CFR Parts 21, 26 and 27; and 23 CFR Parts 200, 230, and 633.

The following provision is adopted from 23 CFR 230, Appendix A, with appropriate revisions to conform to the U.S. Department of Labor (US DOL) and FHWA requirements.

1. Equal Employment Opportunity: Equal employment opportunity (EEO) requirements not to discriminate and to take affirmative action to assure equal opportunity as set forth under laws, executive orders, rules, regulations (28 CFR 35, 29 CFR 1630, 29 CFR 1625-1627, 41 CFR 60 and 49 CFR 27) and orders of the Secretary of Labor as modified by the provisions prescribed herein, and imposed pursuant to 23 U.S.C. 140 shall constitute the EEO and specific affirmative action standards for the contractor's project activities under this contract. The provisions of the Americans with Disabilities Act of 1990 (42 U.S.C. 12101 et seq.) set forth under 28 CFR 35 and 29 CFR 1630 are incorporated by reference in this contract. In the execution of this contract, the contractor agrees to comply with the following minimum specific requirement activities of EEO:
a. The contractor will work with the contracting agency and the Federal Government to ensure that it has made every good faith effort to provide equal opportunity with respect to all of its terms and conditions of employment and in their review of activities under the contract.
b. The contractor will accept as its operating policy thefollowing statement:
"It is the policy of this Company to assure that applicants are employed, and that employees are treated during employment, without regard to their race, religion, sex, color, national origin, age or disability. Such action shall include: employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship, pre-apprenticeship, and/or on-the-job training." FHWA-1273 -- Revised May 1, 2012

Page 10 of 25 ends

January 2021
Redlands Regular Meeting of 09-03-24 1861 of 1977
Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language

2. EEO Officer: The contractor will designate and make known to the contracting officers and EEO Officer who will have the responsibility for and must be capable of effectively administering and promoting and active EEO program and who must be assigned adequate authority and responsibility to do so.

3. Dissemination of Policy: All members of the contractor's staff who are authorized to hire, supervise, promote, and discharge employees, or who recommend such action, or who are
substantially involved in such action, will be made fully cognizant of, and will implement, the contractor's EEO policy and contractual responsibilities to provide EEO in each grade and classification of employment. To ensure that the above agreement will be met, the following actions will be taken as a minimum:
a. Periodic meetings of supervisory and personnel office employees will be conducted before the start of work and then not less often than once every six months, at which time the contractor's EEO policy and its implementation will bereviewed and explained. The meetings will be conducted by the EEO Officer.
b. All new supervisory or personnel office employees will be given a thorough indoctrination by the EEO Officer, covering all major aspects of the contractor's EEO obligations within thirty days following their reporting for duty with the contractor. c. All personnel who are engaged in direct recruitment for the project will be instructed by the EEO Officer in the contractor's procedures for locating and hiring minorities and women. d. Notices and posters setting forth the contractor's EEO policywill be placed in areas readily accessible to employees, applicants for employment and potential employees.
e. The contractor's EEO policy and the procedures to implement such policy will be brought to the attention of employees by means of meetings, employee handbooks, or other appropriate means.

4. Recruitment: When advertising for employees, the contractor will include in all advertisements for employees the notation: "An Equal Opportunity Employer." All such advertisements will be placed in publications having a large circulation among minorities and women in the area from which the project work force would normally be derived.
a. The contractor will, unless precluded by a valid bargaining agreement, conduct systematic and direct recruitment through public and private employee referral sources likely to yield qualified minorities and women. To meet this requirement, the contractor will identify sources of potential minority group employees, and establish with such identified sources
procedures whereby minority and women applicants may be referred to the contractor for employment consideration. b. In the event the contractor has a valid bargaining agreement providing for exclusive hiring hall referrals, the contractor is expected to observe the provisions of that agreement to the extent that the system meets the contractor's compliance with EEO contract provisions. Where implementation of such an agreement has the effect of discriminating against minorities or women, or obligates the contractor to do the same, such implementation violates Federal nondiscrimination provisions. c. The contractor will encourage its present employees to refer minorities and women as applicants for employment.

Information and procedures with regard to referring such applicants will be discussed with employees.

5. Personnel Actions: Wages, working conditions, and employee benefits shall be established and administered, and personnel actions of every type, including hiring, upgrading, promotion, transfer, demotion, layoff, and termination, shall be taken without regard to race, color, religion, sex, national origin, age or disability.

The following procedures shall be followed:
a. The contractor will conduct periodic inspections of project sites to insure that working conditions and employee facilities do not indicate discriminatory treatment of project site personnel. b. The contractor will periodically evaluate the spread of wagespaid within each classification to determine any evidence of discriminatory wage practices.
c. The contractor will periodically review selected personnel actions in depth to determine whether there is evidence ofdiscrimination.

Where evidence is found, the contractor will promptly take corrective action. If the review indicates that the discrimination may extend beyond the actions reviewed, such corrective action shall include all affected persons.
d. The contractor will promptly investigate all complaints of alleged discrimination made to the contractor in connection with its obligations under this contract, will attempt to resolve such complaints, and will take appropriate corrective action within a reasonable time. If the investigation indicates that the discrimination may affect persons other than the complainant, such corrective action shall include such other persons. Upon completion of each investigation, the contractor will inform every complainant of all of their avenues of appeal.

6. Training and Promotion:
a. The contractor will assist in locating, qualifying, and increasing the skills of minorities and women who are applicants for employment or current employees. Such efforts should be aimed at developing full journey level status employees in the type of trade or job classification involved.
b. Consistent with the contractor's work force requirements and as permissible under Federal and State regulations, the contractor shall make full use of training programs, i.e., apprenticeship, and on-the-job training programs for the geographical area of contract performance. In the event a special provision for training is provided under this contract, this subparagraph will be superseded as indicated in the special provision. The contracting agency may reserve training positions for persons who receive welfare assistance in accordance with 23 U.S.C. 140(a). c. The contractor will advise employees and applicants for employment of available training programs and entrance
requirements for each.
d. The contractor will periodically review the training andpromotion potential of employees who are minorities and women and will encourage eligible employees to apply for such training and promotion.

Page 11 of 25 ends

January 2021
Redlands Regular Meeting of 09-03-24 1862 of 1977
Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language

7. Unions: If the contractor relies in whole or in part upon unions as a source of employees, the contractor will use good faith efforts to obtain the cooperation of such unions to increase opportunities for minorities and women. Actions by the contractor, either directly or through a contractor's association acting as agent, will include the procedures set forth below:
a. The contractor will use good faith efforts to develop, in cooperation with the unions, joint training programs aimed toward qualifying more minorities and women for membership in the unions and increasing the skills of minorities and women so that they may qualify for higher paying employment.
b. The contractor will use good faith efforts to incorporate an EEO clause into each union agreement to the end that such union will be contractually bound to refer applicants without regard to their race, color, religion, sex, national origin, age or disability. c. The contractor is to obtain information as to the referral practices and policies of the labor union except that to the extent such information is within the exclusive possession of the labor union and such labor union refuses to furnish such information to the contractor, the contractor shall so certify to the contracting agency and shall set forth what efforts have been made to obtain such information.
d. In the event the union is unable to provide the contractor with a reasonable flow of referrals within the time limit set forth in the collective bargaining agreement, the contractor will, through independent recruitment efforts, fill the employment vacancies without regard to race, color, religion, sex, national origin, age or disability; making full efforts to obtain qualified and/or qualifiable minorities and women. The failure of a union to provide sufficient referrals (even though it is obligated to provide exclusive referrals under the terms of a collective bargaining agreement) does not relieve the contractor from the requirements of this paragraph. In the event the union referral practice prevents the contractor from meeting the obligations pursuant to Executive Order 11246, as amended, and these special provisions, such contractor shall immediately notify the contracting agency.

8. Reasonable Accommodation for Applicants / Employees
with Disabilities: The contractor must be familiar with the requirements for and comply with the Americans with Disabilities Act and all rules and regulations established there under.

Employers must provide reasonable accommodation in all
employment activities unless to do so would cause an undue hardship.

9. Selection of Subcontractors, Procurement of Materials and Leasing of Equipment: The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract. a. The contractor shall notify all potential subcontractors and suppliers and lessors of their EEO obligations under this contract. b. The contractor will use good faith efforts to ensure subcontractor compliance with their EEO obligations.

FHWA-1273 -- Revised May 1, 2012

10. Assurance Required by 49 CFR 26.13(b):
a. The requirements of 49 CFR Part 26 and the State DOT’s U.S.

DOT-approved DBE program are incorporated by reference. b. The contractor or subcontractor shall not discriminate on the basis of race, color, national origin, or sex in the performance of this contract. The contractor shall carry out applicable requirements of 49 CFR Part 26 in the award and administration of DOT-assisted contracts. Failure by the contractor to carry out these requirements is a material breach of this contract, which may result in the termination of this contract or such other remedy as the contracting agency deems appropriate.

11. Records and Reports: The contractor shall keep such records as necessary to document compliance with the EEO requirements.

Such records shall be retained for a period of three years following the date of the final payment to the contractor for all contract work and shall be available at reasonable times and places for inspection by authorized representatives of the contracting agency and the FHWA.
a. The records kept by the contractor shall document the following:
(1) The number and work hours of minority and non-minority group members and women employed in each work classification on the project;
(2) The progress and efforts being made in cooperation with unions, when applicable, to increase employment opportunities for minorities and women; and
(3) The progress and efforts being made in locating, hiring, training, qualifying, and upgrading minorities and women.
b. The contractors and subcontractors will submit an annual report to the contracting agency each July for the duration of the project, indicating the number of minority, women, and nonminority group employees currently engaged in each work classification required by the contract work. This information is to be reported on Form FHWA-1391. The staffing data should represent the project work force on board in all or any part of the last payroll period preceding the end of July. If on-the-job training is being required by special provision, the contractor will be required to collect and report training data. The employment data should reflect the work force on board during all or any part of the last payroll period preceding the end of July.

III. NONSEGREGATED FACILITIES
This provision is applicable to all Federal-aid construction contracts and to all related construction subcontracts of $10,000 or more.

The contractor must ensure that facilities provided for employees are provided in such a manner that segregation on the basis of race, color, religion, sex, or national origin cannot result. The contractor may neither require such segregated use by written or oral policies nor tolerate such use by employee custom. The contractor's obligation extends further to ensure that its employees are not assigned to perform their services at any location, under the contractor's control, where the facilities are segregated. The term "facilities" includes waiting rooms, work areas, restaurants and other eating areas, time clocks, restrooms, washrooms, locker rooms, and other storage or dressing areas, parking lots, drinking fountains, recreation or entertainment areas, transportation, and housing provided for employees. The contractor shall provide separate or single-user restrooms and necessary dressing or sleeping areas to assure privacy between sexes.

Page 12 of 25 ends

January 2021
Redlands Regular Meeting of 09-03-24 1863 of 1977
Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language
IV. DAVIS-BACON AND RELATED ACT PROVISIONS
This section is applicable to all Federal-aid construction projects exceeding $2,000 and to all related subcontracts and lower-tier subcontracts (regardless of subcontract size). The requirements apply to all projects located within the right-of-way of a roadway that is functionally classified as Federal-aid highway. This excludes roadways functionally classified as local roads or rural minor collectors, which are exempt. Contracting agencies may elect to apply these requirements to other projects.

The following provisions are from the U.S. Department of Labor regulations in 29 CFR 5.5 “Contract provisions and related matters” with minor revisions to conform to the FHWA-1273 format and FHWA program requirements.

1. Minimum wages
a. All laborers and mechanics employed or working upon the site of the work, will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics.

Contributions made or costs reasonably anticipated for bona fide fringe benefits under section 1(b)(2) of the Davis-Bacon Act on behalf of laborers or mechanics are considered wages paid to such laborers or mechanics, subject to the provisions of paragraph 1.d. of this section; also, regular contributions made or costs incurred for more than a weekly period (but not less often than quarterly) under plans, funds, or programs which cover the particular weekly period, are deemed to be constructively made or incurred during such weekly period. Such laborers and mechanics shall be paid the appropriate wage rate and fringe benefits on the wage
determination for the classification of work actually performed, without regard to skill, except as provided in 29 CFR 5.5(a)(4).

Laborers or mechanics performing work in more than one
classification may be compensated at the rate specified for each classification for the time actually worked therein: Provided, That the employer's payroll records accurately set forth the time spent in each classification in which work is performed. The wage determination (including any additional classification and wage rates conformed under paragraph 1.b. of this section) and the Davis-Bacon poster (WH–1321) shall be posted at all times by the contractor and its subcontractors at the site of the work in a prominent and accessible place where it can be easily seen by the workers.
b. (1) The contracting officer shall require that any class of laborers or mechanics, including helpers, which is not listed in the wage determination and which is to be employed under the contract shall be classified in conformance with the wage determination. The contracting officer shall approve an additional classification and wage rate and fringe benefits therefore only when the following criteria have been met:

FHWA-1273 -- Revised May 1, 2012
(i) The work to be performed by the classification requested is not performed by a classification in the wage determination; and (ii) The classification is utilized in the area by the construction industry; and
(iii) The proposed wage rate, including any bona fide fringe benefits, bears a reasonable relationship to the wage rates contained in the wage determination.
(2) If the contractor and the laborers and mechanics to be employed in the classification (if known), or their
representatives, and the contracting officer agree on the classification and wage rate (including the amount designated for fringe benefits where appropriate), a report of the action taken shall be sent by the contracting officer to the Administrator of the Wage and Hour Division, Employment Standards
Administration, U.S. Department of Labor, Washington, DC 20210. The Administrator, or an authorized representative, will approve, modify, or disapprove every additional classification action within 30 days of receipt and so advise the contracting officer or will notify the contracting officer within the 30-day period that additional time is necessary.
(3) In the event the contractor, the laborers or mechanics to be employed in the classification or their representatives, and the contracting officer do not agree on the proposed classification and wage rate (including the amount designated for fringe benefits, where appropriate), the contracting officer shall refer the questions, including the views of all interested parties and the recommendation of the contracting officer, to the Wage and Hour Administrator for determination. The Wage and Hour Administrator, or an authorized representative, will issue a determination within 30 days of receipt and so advise the contracting officer or will notify the contracting officer within the 30-day period that additional time is necessary.
(4) The wage rate (including fringe benefits where appropriate) determined pursuant to paragraphs 1.b.(2) or 1.b.(3) of this section, shall be paid to all workers performing work in the classification under this contract from the first day on which work is performed in the classification.
c. Whenever the minimum wage rate prescribed in the contract for a class of laborers or mechanics includes a fringe benefit which is not expressed as an hourly rate, the contractor shall either pay the benefit as stated in the wage determination or shall pay another bona fide fringe benefit or an hourly cash equivalent thereof.
d. If the contractor does not make payments to a trustee or other third person, the contractor may consider as part of the wages of any laborer or mechanic the amount of any costs reasonably anticipated in providing bona fide fringe benefits under a plan or program, Provided, That the Secretary of Labor has found, upon the written request of the contractor, that the applicable standards of the Davis-Bacon Act have been met. The Secretary of Labor may require the contractor to set aside in a separate account assets for the meeting of obligations under the plan or program.

Page 13 of 25 ends

January 2021
Redlands Regular Meeting of 09-03-24 1864 of 1977
Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language

2. Withholding
The contracting agency shall upon its own action or upon written request of an authorized representative of the Department of Labor, withhold or cause to be withheld from the contractor under this contract, or any other Federal contract with the same prime contractor, or any other federally-assisted contract subject to DavisBacon prevailing wage requirements, which is held by the same prime contractor, so much of the accrued payments or advances as may be considered necessary to pay laborers and mechanics, including apprentices, trainees, and helpers, employed by the contractor or any subcontractor the full amount of wages required by the contract. In the event of failure to pay any laborer or mechanic, including any apprentice, trainee, or helper, employed or working on the site of the work, all or part of the wages required by the contract, the contracting agency may, after written notice to the contractor, take such action as may be necessary to cause the suspension of any further payment, advance, or guarantee of funds until such violations have ceased.

3. Payrolls and basic records
a. Payrolls and basic records relating thereto shall be maintained by the contractor during the course of the work and preserved for a period of three years thereafter for all laborers and mechanics working at the site of the work. Such records shall contain the name, address, and social security number of each such worker, his or her correct classification, hourly rates of wages paid (including rates of contributions or costs anticipated for bona fide fringe benefits or cash equivalents thereof of the types described in section 1(b)(2)(B) of the Davis-Bacon Act), daily and weekly number of hours worked, deductions made and actual wages paid.

Whenever the Secretary of Labor has found under 29 CFR

5.5(a)(1)(iv) that the wages of any laborer or mechanic include the amount of any costs reasonably anticipated in providing benefits under a plan or program described in section 1(b)(2)(B) of the Davis-Bacon Act, the contractor shall maintain records which show that the commitment to provide such benefits is enforceable, that the plan or program is financially responsible, and that the plan or program has been communicated in writing to the laborers or mechanics affected, and records which show the costs anticipated or the actual cost incurred in providing such benefits. Contractors employing apprentices or trainees under approved programs shall maintain written evidence of the registration of apprenticeship programs and certification of trainee programs, the registration of the apprentices and trainees, and the ratios and wage rates prescribed in the applicable programs.
b. (1) The contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the contracting agency. The payrolls submitted shall set out accurately and completely all of the information required to be maintained under 29 CFR 5.5(a)(3)(i), except that full social security numbers and home addresses shall not be included on weekly transmittals.

Instead the payrolls shall only need to include an individually identifying number for each employee ( e.g. , the last four digits of the employee's social security number). The required weekly payroll information may be submitted in any form desired. Optional Form WH–347 is available for this purpose from the Wage and Hour Division Web site at
http://www.dol.gov/esa/whd/forms/wh347instr.htm or its successor site. The prime contractor is responsible for the submission of copies of payrolls by all subcontractors. Contractors and subcontractors shall maintain the full social security number and FHWA-1273 -- Revised May 1, 2012
current address of each covered worker, and shall provide them upon request to the contracting agency for transmission to the State DOT, the FHWA or the Wage and Hour Division of the Department of Labor for purposes of an investigation or audit of compliance with prevailing wage requirements. It is not a violation of this section for a prime contractor to require a subcontractor to provide addresses and social security numbers to the prime contractor for its own records, without weekly submission to the contracting agency.
(2) Each payroll submitted shall be accompanied by a “Statement of Compliance,” signed by the contractor or subcontractor or his or her agent who pays or supervises the payment of the
persons employed under the contract and shall certify the following:
(i) That the payroll for the payroll period contains the information required to be provided under §5.5 (a)(3)(ii) of Regulations, 29 CFR part 5, the appropriate information is being maintained under §5.5 (a)(3)(i) of Regulations, 29 CFR part 5, and that such information is correct and complete;
(ii)That each laborer or mechanic (including each helper, apprentice, and trainee) employed on the contract during the payroll period has been paid the full weekly wages earned, without rebate, either directly or indirectly, and that no deductions have been made either directly or indirectly from the full wages earned, other than permissible deductions as set forth in Regulations, 29 CFR part 3;
(iii) That each laborer or mechanic has been paid not less than the applicable wage rates and fringe benefits or cash equivalents for the classification of work performed, as specified in the applicable wage determination incorporated into the contract. (3) The weekly submission of a properly executed certification set forth on the reverse side of Optional Form WH–347 shall satisfy the requirement for submission of the “Statement of Compliance” required by paragraph 3.b.(2) of this section. (4) The falsification of any of the above certifications may subject the contractor or subcontractor to civil or criminal prosecution under section 1001 of title 18 and section 231 of title 31 of the United States Code.
c. The contractor or subcontractor shall make the records required under paragraph 3.a. of this section available for inspection, copying, or transcription by authorized
representatives of the contracting agency, the State DOT, the FHWA, or the Department of Labor, and shall permit such representatives to interview employees during working hours on the job. If the contractor or subcontractor fails to submit the required records or to make them available, the FHWA may, after written notice to the contractor, the contracting agency or the State DOT, take such action as may be necessary to
cause the suspension of any further payment, advance, or guarantee of funds. Furthermore, failure to submit the required records upon request or to make such records available may be grounds for debarment action pursuant to 29 CFR 5.12.

Page 14 of 25 ends

January 2021
Redlands Regular Meeting of 09-03-24 1865 of 1977
Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language

4. Apprentices and trainees
a. Apprentices (programs of the USDOL).

Apprentices will be permitted to work at less than the predetermined rate for the work they performed when they are employed pursuant to and individually registered in a bona fide apprenticeship program registered with the U.S. Department of Labor, Employment and Training Administration, Office of Apprenticeship Training, Employer and Labor Services, or with a State Apprenticeship Agency recognized by the Office, or if a person is employed in his or her first 90 days of probationary employment as an apprentice in such an apprenticeship program, who is not individually registered in the program, but who has been certified by the Office of Apprenticeship Training, Employer and Labor Services or a State Apprenticeship Agency (where appropriate) to be eligible for probationary employment as an apprentice.

The allowable ratio of apprentices to journeymen on the job site in any craft classification shall not be greater than the ratio permitted to the contractor as to the entire work force under the registered program. Any worker listed on a payroll at an apprentice wage rate, who is not registered or otherwise employed as stated above, shall be paid not less than the applicable wage rate on the wage determination for the classification of work actually performed. In addition, any apprentice performing work on the job site in excess of the ratio permitted under the registered program shall be paid not less than the applicable wage rate on the wage determination for the work actually performed. Where a contractor is performing construction on a project in a locality other than that in which its program is registered, the ratios and wage rates (expressed in percentages of the journeyman's hourly rate) specified in the contractor's or subcontractor's registered program shall be observed.

Every apprentice must be paid at not less than the rate specified in the registered program for the apprentice's level of progress, expressed as a percentage of the journeymen hourly rate specified in the applicable wage determination. Apprentices shall be paid fringe benefits in accordance with the provisions of the apprenticeship program. If the apprenticeship program does not specify fringe benefits, apprentices must be paid the full amount of fringe benefits listed on the wage determination for the applicable classification. If the Administrator determines that a different practice prevails for the applicable apprentice classification, fringes shall be paid in accordance with that determination.

In the event the Office of Apprenticeship Training, Employer and Labor Services, or a State Apprenticeship Agency recognized by the Office, withdraws approval of an apprenticeship program, the contractor will no longer be permitted to utilize apprentices at less than the applicable predetermined rate for the work performed until an acceptable program is approved.
b. Trainees (programs of the USDOL).

Except as provided in 29 CFR 5.16, trainees will not be permitted to work at less than the predetermined rate for the work performed unless they are employed pursuant to and individually registered in a program which has received prior approval, evidenced by formal certification by the U.S. Department of Labor, Employment and Training Administration.

FHWA-1273 -- Revised May 1, 2012
The ratio of trainees to journeymen on the job site shall not be greater than permitted under the plan approved by the Employment and Training Administration.

Every trainee must be paid at not less than the rate specified in the approved program for the trainee's level of progress, expressed as a percentage of the journeyman hourly rate specified in the applicable wage determination. Trainees shall be paid fringe benefits in accordance with the provisions of the trainee program. If the trainee program does not mention fringe benefits, trainees shall be paid the full amount of fringe benefits listed on the wage determination unless the Administrator of the Wage and Hour Division determines that there is an apprenticeship program associated with the corresponding journeyman wage rate on the wage determination which provides for less than full fringe benefits for apprentices. Any employee listed on the payroll at a trainee rate who is not registered and participating in a training plan approved by the Employment and Training Administration shall be paid not less than the applicable wage rate on the wage determination for the classification of work actually performed. In addition, any trainee performing work on the job site in excess of the ratio permitted under the registered program shall be paid not less than the applicable wage rate on the wage determination for the work actually performed.

In the event the Employment and Training Administration withdraws approval of a training program, the contractor will no longer be permitted to utilize trainees at less than the applicable predetermined rate for the work performed until an acceptable program is approved.
c. Equal employment opportunity. The utilization of apprentices, trainees and journeymen under this part shall be in conformity with the equal employment opportunity requirements of Executive Order 11246, as amended, and 29 CFR part 30.
d. Apprentices and Trainees (programs of the U.S. DOT).

Apprentices and trainees working under apprenticeship and skill training programs which have been certified by the Secretary of Transportation as promoting EEO in connection with Federal-aid highway construction programs are not subject to the requirements of paragraph 4 of this Section IV. The straight time hourly wage rates for apprentices and trainees under such programs will be established by the particular programs. The ratio of apprentices and trainees to journeymen shall not be greater than permitted by the terms of the particular program.

5. Compliance with Copeland Act requirements. The contractor shall comply with the requirements of 29 CFR part 3, which are incorporated by reference in this contract.

6. Subcontracts. The contractor or subcontractor shall insert Form FHWA-1273 in any subcontracts and also require the subcontractors to include Form FHWA-1273 in any lower tier subcontracts. The prime contractor shall be responsible for the compliance by any subcontractor or lower tier subcontractor with all the contract clauses in 29 CFR 5.5.

7. Contract termination: debarment. A breach of the contract clauses in 29 CFR 5.5 may be grounds for termination of the contract, and for debarment as a contractor and a subcontractor as provided in 29 CFR 5.12.

Page 15 of 25 ends

January 2021
Redlands Regular Meeting of 09-03-24 1866 of 1977
Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language

8. Compliance with Davis-Bacon and Related Act requirements.

All rulings and interpretations of the Davis-Bacon and Related Acts contained in 29 CFR parts 1, 3, and 5 are herein incorporated by reference in this contract.

9. Disputes concerning labor standards. Disputes arising out of the labor standards provisions of this contract shall not be subject to the general disputes clause of this contract. Such disputes shall be resolved in accordance with the procedures of the Department of Labor set forth in 29 CFR parts 5, 6, and 7. Disputes within the meaning of this clause include disputes between the contractor (or any of its subcontractors) and the contracting agency, the U.S.

Department of Labor, or the employees or their representatives.

10. Certification of eligibility.
a. By entering into this contract, the contractor certifies that neither it (nor he or she) nor any person or firm who has an interest in the contractor's firm is a person or firm ineligible to be awarded Government contracts by virtue of section 3(a) of the DavisBacon Act or 29 CFR 5.12(a)(1). b. No part of this contract shall be subcontracted to any person or firm ineligible for award of a Government contract by virtue of section 3(a) of the Davis-Bacon Act or 29 CFR 5.12(a)(1). c. The penalty for making false statements is prescribed in theU.S.

Criminal Code, 18 U.S.C. 1001.

V. CONTRACT WORK HOURS AND SAFETY STANDARDS
ACT
The following clauses apply to any Federal-aid construction contract in an amount in excess of $100,000 and subject to the overtime provisions of the Contract Work Hours and Safety Standards Act.

These clauses shall be inserted in addition to the clauses required by 29 CFR 5.5(a) or 29 CFR 4.6. As used in this paragraph, the terms laborers and mechanics include watchmen and guards.

1. Overtime requirements. No contractor or subcontractor contracting for any part of the contract work which may require or involve the employment of laborers or mechanics shall require or permit any such laborer or mechanic in any workweek in which he or she is employed on such work to work in excess of forty hours in such workweek unless such laborer or mechanic receives
compensation at a rate not less than one and one-half times the basic rate of pay for all hours worked in excess of forty hours in such workweek.

2. Violation; liability for unpaid wages; liquidated damages. In the event of any violation of the clause set forth in paragraph (1.) of this section, the contractor and any subcontractor responsible therefor shall be liable for the unpaid wages. In addition, such contractor and subcontractor shall be liable to the United States (in the case of work done under contract for the District of Columbia or a territory, to such District or to such territory), for liquidated damages. Such liquidated damages shall be computed with respect to each individual laborer or mechanic, including watchmen and guards, employed in violation of the clause set forth inparagraph(1.) of this section, in the sum of $10 for each calendar day on which such individual was required or permitted to work in excess of the standard workweek of forty hours without payment of the overtime wages required by the clause set forth in paragraph (1.) of this section.

FHWA-1273 -- Revised May 1, 2012

3. Withholding for unpaid wages and liquidated damages. The FHWA or the contacting agency shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld, from any moneys payable on account of work performed by the contractor or subcontractor under any such contract or any other Federal contract with the same prime contractor, or any other federally-assisted contract subject to the Contract Work Hours and Safety Standards Act, which is held by the same prime contractor, such sums as may be determined to be necessary to satisfy any liabilities of such contractor or subcontractor for unpaid wages and liquidated damages as provided in the clause set forth in paragraph (2.) of this section.

4. Subcontracts. The contractor or subcontractor shall insert in any subcontracts the clauses set forth in paragraph (1.) through (4.) of this section and also a clause requiring the subcontractors to include these clauses in any lower tier subcontracts. The prime contractor shall be responsible for compliance by any subcontractor or lower tier subcontractor with the clauses set forth in paragraphs (1.) through (4.) of this section.

VI. SUBLETTING OR ASSIGNING THE CONTRACT
This provision is applicable to all Federal-aid construction contracts on the National Highway System.

1. The contractor shall perform with its own organization contract work amounting to not less than 30 percent (or a greater percentage if specified elsewhere in the contract) of the total original contract price, excluding any specialty items designated by the contracting agency. Specialty items may be performed by subcontract and the amount of any such specialty items performed may be deducted from the total original contract price before computing the amount of work required to be performed by the contractor's own organization (23 CFR 635.116).
a. The term “perform work with its own organization” refers to workers employed or leased by the prime contractor, and equipment owned or rented by the prime contractor, with or without operators. Such term does not include employees or equipment of a subcontractor or lower tier subcontractor, agents of the prime contractor, or any other assignees. The term may include payments for the costs of hiring leased employees from an employee leasing firm meeting allrelevant Federal and State regulatory requirements. Leased
employees may only be included in this term if the prime contractor meets all of the following conditions:
(1) the prime contractor maintains control over the supervision of the day-to-day activities of the leased employees;
(2) the prime contractor remains responsible for the quality of the work of the leased employees;
(3) the prime contractor retains all power to accept or exclude individual employees from work on the project; and
(4) the prime contractor remains ultimately responsible for the payment of predetermined minimum wages, the submission of payrolls, statements of compliance and all other Federal regulatory requirements.
b. "Specialty Items" shall be construed to be limited to work that requires highly specialized knowledge, abilities, or equipment not ordinarily available in the type of contracting organizations qualified and expected to bid or propose on the contract as a whole and in general are to be limited to minor components of the overall contract.

Page 16 of 25 ends

January 2021
Redlands Regular Meeting of 09-03-24 1867 of 1977
Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language

2. The contract amount upon which the requirements set forth in paragraph (1) of Section VI is computed includes the cost of material and manufactured products which are to be purchasedor produced by the contractor under the contract provisions.

3. The contractor shall furnish (a) a competent superintendent or supervisor who is employed by the firm, has full authority todirect performance of the work in accordance with the contract requirements, and is in charge of all construction operations (regardless of who performs the work) and (b) such other of its own organizational resources (supervision, management, and engineering services) as the contracting officer determines is necessary to assure the performance of the contract.

4. No portion of the contract shall be sublet, assigned orotherwise disposed of except with the written consent of the contracting officer, or authorized representative, and such consent when given shall not be construed to relieve the contractor of any responsibility for the fulfillment of the contract. Written consent will be given only after the contracting agency has assured that each subcontract is evidenced in writing and that it contains all pertinent provisions and requirements of the prime contract.

5. The 30% self-performance requirement of paragraph (1) is not applicable to design-build contracts; however, contracting agencies may establish their own self-performancerequirements.

VII. SAFETY: ACCIDENT PREVENTION
This provision is applicable to all Federal-aid construction contracts and to all related subcontracts.

1. In the performance of this contract the contractor shall comply with all applicable Federal, State, and local laws governing safety, health, and sanitation (23 CFR 635). The contractor shall provide all safeguards, safety devices and protective equipment and take any other needed actions as it determines, or as the contracting officer may determine, to be reasonably necessary to protect the life and health of employees on the job and the safety of the public and to protect property in connection with the performance of the work covered by the contract.

2. It is a condition of this contract, and shall be made a condition of each subcontract, which the contractor enters into pursuant to this contract, that the contractor and any subcontractor shall not permit any employee, in performance of the contract, to work in surroundings or under conditions which are unsanitary, hazardous or dangerous to his/her health or safety, as determined under construction safety and health standards (29 CFR 1926)
promulgated by the Secretary of Labor, in accordance with Section 107 of the Contract Work Hours and Safety Standards Act (40 U.S.C. 3704).

3. Pursuant to 29 CFR 1926.3, it is a condition of this contract that the Secretary of Labor or authorized representative thereof, shall have right of entry to any site of contract performance to inspector investigate the matter of compliance with the construction safety and health standards and to carry out the duties of the Secretary under Section 107 of the Contract Work Hours and Safety Standards Act (40 U.S.C.3704).

VIII. FALSE STATEMENTS CONCERNING HIGHWAY

PROJECTS
This provision is applicable to all Federal-aid construction contracts and to all related subcontracts.

In order to assure high quality and durable construction in conformity with approved plans and specifications and a high degree of reliability on statements and representations made by engineers, contractors, suppliers, and workers on Federal-aid highway projects, it is essential that all persons concerned with the project perform their functions as carefully, thoroughly, and honestly as possible.

Willful falsification, distortion, or misrepresentation with respect to any facts related to the project is a violation of Federal law. To prevent any misunderstanding regarding the seriousness ofthese and similar acts, Form FHWA-1022 shall be posted on each Federal-aid highway project (23 CFR 635) in one or more places where it is readily available to all persons concerned with the project:
18 U.S.C. 1020 reads as follows:
"Whoever, being an officer, agent, or employee of the United States, or of any State or Territory, or whoever, whether a person, association, firm, or corporation, knowingly makes any false statement, false representation, or false report as to the character, quality, quantity, or cost of the material used or to be used, or the quantity or quality of the work performed or to be performed, or the cost thereof in connection with the submission of plans, maps, specifications, contracts, or costs of construction on any highway or related project submitted for approval to the Secretary of Transportation; or
Whoever knowingly makes any false statement, false
representation, false report or false claim with respect to the character, quality, quantity, or cost of any work performed or to be performed, or materials furnished or to be furnished, in connection with the construction of any highway or related project approved by the Secretary of Transportation; or
Whoever knowingly makes any false statement or false
representation as to material fact in any statement, certificate, or report submitted pursuant to provisions of the Federal-aid Roads Act approved July 1, 1916, (39 Stat. 355), as amended and
supplemented;
Shall be fined under this title or imprisoned not more than 5 years or both."
IX. IMPLEMENTATION OF CLEAN AIR ACT AND FEDERAL

WATER POLLUTION CONTROL ACT
This provision is applicable to all Federal-aid construction contracts and to all related subcontracts.

By submission of this bid/proposal or the execution of this contract, or subcontract, as appropriate, the bidder, proposer, Federal-aid construction contractor, or subcontractor, as appropriate, will be deemed to have stipulated as follows:

1. That any person who is or will be utilized in the
performance of this contract is not prohibited from receiving an award due to a violation of Section 508 of the Clean Water Act or Section 306 of the Clean Air Act.

2. That the contractor agrees to include or cause to be included the requirements of paragraph (1) of this Section X in every subcontract, and further agrees to take such action as the contracting agency may direct as a means of enforcing such requirements.

Page 17 of 25 ends

January 2021
Redlands Regular Meeting of 09-03-24 1868 of 1977
Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language
FHWA-1273 -- Revised May 1, 2012
X. CERTIFICATION REGARDING DEBARMENT, SUSPENSION,

INELIGIBILITY AND VOLUNTARY EXCLUSION
This provision is applicable to all Federal-aid construction contracts, design-build contracts, subcontracts, lower-tier subcontracts, purchase orders, lease agreements, consultant contracts or any other covered transaction requiring FHWA approval or that is estimated to cost $25,000 or more – as defined in 2 CFR Parts 180 and 1200.

1. Instructions for Certification – First Tier Participants:
a. By signing and submitting this proposal, the prospective first tier participant is providing the certification set out below. b. The inability of a person to provide the certification set out below will not necessarily result in denial of participation in this covered transaction. The prospective first tier participant shall submit an explanation of why it cannot provide the certification set outbelow.

The certification or explanation will be considered in connection with the department or agency's determination whether to enter into this transaction. However, failure of the prospective first tier participant to furnish a certification or an explanation shall disqualify such a person from participation in this transaction. c. The certification in this clause is a material representation of fact upon which reliance was placed when the contracting agency determined to enter into this transaction. If it is later determined that the prospective participant knowingly rendered an erroneous certification, in addition to other remedies available to the Federal Government, the contracting agency may terminate this
transaction for cause of default.
d. The prospective first tier participant shall provide immediatewritten notice to the contracting agency to whom this proposal is submitted if any time the prospective first tier participant learns that its certification was erroneous when submitted or has become erroneous by reason of changed circumstances.
e. The terms "covered transaction," "debarred," "suspended," "ineligible," "participant," "person," "principal," and "voluntarily excluded," as used in this clause, are defined in 2 CFR Parts 180 and 1200. “First Tier Covered Transactions” refers to any covered transaction between a grantee or subgrantee of Federal funds and a participant (such as the prime or general contract). “Lower Tier Covered Transactions” refers to any covered transaction under a First Tier Covered Transaction (such as subcontracts). “First Tier Participant” refers to the participant who has entered into a covered transaction with a grantee or subgrantee of Federal funds (such as the prime or general contractor). “Lower Tier Participant” refers any participant who has entered into a covered transaction with a First Tier Participant or other Lower Tier Participants (such as subcontractors and suppliers).
f. The prospective first tier participant agrees by submitting this proposal that, should the proposed covered transaction be entered into, it shall not knowingly enter into any lower tier covered transaction with a person who is debarred, suspended, declared ineligible, or voluntarily excluded from participation in this covered transaction, unless authorized by the department or agency entering into this transaction.
g. The prospective first tier participant further agrees by submitting this proposal that it will include the clause titled "Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion-Lower Tier Covered Transactions," provided by the department or contracting agency, entering into this covered transaction, without modification, in all lower tier covered transactions and in all solicitations for lower tier covered transactions exceeding the $25,000 threshold.
h. A participant in a covered transaction may rely upon a certification of a prospective participant in a lower tier covered transaction that is not debarred, suspended, ineligible, or voluntarily excluded from the covered transaction, unless it knows that the certification is erroneous. A participant is responsible for ensuring that its principals are not suspended, debarred, or otherwise ineligible to participate in covered transactions. To verify the eligibility of its principals, as well as the eligibility of any lower tier prospective participants, each participant may, but is not required to, checkthe Excluded Parties List System website (https://www.epls.gov/), which is compiled by the General Services Administration. i. Nothing contained in the foregoing shall be construed to require the establishment of a system of records in order to render ingood faith the certification required by this clause. The knowledge and information of the prospective participant is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings.
j. Except for transactions authorized under paragraph (f) of these instructions, if a participant in a covered transaction knowingly enters into a lower tier covered transaction with a person who is suspended, debarred, ineligible, or voluntarily excluded from participation in this transaction, in addition to other remedies available to the Federal Government, the department or agency may terminate this transaction for cause or default.
* * *

2. Certification Regarding Debarment, Suspension,Ineligibility and Voluntary Exclusion – First Tier Participants:
a. The prospective first tier participant certifies to the best of its knowledge and belief, that it and its principals:
(1) Are not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participating in covered transactions by any Federal department or agency;
(2) Have not within a three-year period preceding this proposal been convicted of or had a civil judgment rendered against them for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (Federal, State or local) transaction or contract under a public transaction; violation of Federal or State antitrust statutes or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, or receiving stolen property;
(3) Are not presently indicted for or otherwise criminally or civilly charged by a governmental entity (Federal, State or local) with commission of any of the offenses enumerated in paragraph (a)(2) of this certification; and
(4) Have not within a three-year period preceding this
application/proposal had one or more public transactions (Federal, State or local) terminated for cause or default. b. Where the prospective participant is unable to certify to any of the statements in this certification, such prospective participant shall attach an explanation to this proposal.

Page 18 of 25 ends

January 2021
Redlands Regular Meeting of 09-03-24 1869 of 1977
Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language

2. Instructions for Certification - Lower Tier Participants:
(Applicable to all subcontracts, purchase orders and other lower tier transactions requiring prior FHWA approval or estimated to cost $25,000 or more - 2 CFR Parts 180 and 1200)
a. By signing and submitting this proposal, the prospective lowertier is providing the certification set out below.
b. The certification in this clause is a material representation of fact upon which reliance was placed when this transaction was entered into. If it is later determined that the prospective lower tier participant knowingly rendered an erroneous certification, in addition to other remedies available to the Federal Government, the department, or agency with which this transaction originated may pursue available remedies, including suspension and/or debarment.
c. The prospective lower tier participant shall provide immediate written notice to the person to which this proposal is submitted if at any time the prospective lower tier participant learns that its certification was erroneous by reason of changed circumstances. d. The terms "covered transaction," "debarred," "suspended," "ineligible," "participant," "person," "principal," and "voluntarily excluded," as used in this clause, are defined in 2 CFR Parts 180 and 1200. You may contact the person to which this proposal is submitted for assistance in obtaining a copy of those regulations. “First Tier Covered Transactions” refers to any covered transaction between a grantee or subgrantee of Federal funds and a participant (such as the prime or general contract). “Lower Tier Covered Transactions” refers to any covered transaction under a First Tier Covered Transaction (such as subcontracts). “First Tier Participant” refers to the participant who has entered into a covered transaction with a grantee or subgrantee of Federal funds (such as the prime or general contractor). “Lower Tier Participant” refers any participant who has entered into a covered transaction with a First Tier Participant or other Lower Tier Participants (such as subcontractors and suppliers). e. The prospective lower tier participant agrees by submitting this proposal that, should the proposed covered transaction be entered into, it shall not knowingly enter into any lower tier covered transaction with a person who is debarred, suspended, declared ineligible, or voluntarily excluded from participation in this covered transaction, unless authorized by the department or agency with which this transaction originated.
f. The prospective lower tier participant further agrees by submitting this proposal that it will include this clause titled "Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion-Lower Tier Covered Transaction," without modification, in all lower tier covered transactions and in all solicitations for lower tier covered transactions exceeding the $25,000 threshold. g. A participant in a covered transaction may rely upon a certification of a prospective participant in a lower tier covered transaction that is not debarred, suspended, ineligible, or voluntarily excluded from the covered transaction, unless it knows that the certification is erroneous. A participant is responsible for ensuring that its principals are not suspended, debarred, or otherwise ineligible to participate in covered transactions. To verify the eligibility of its principals, as well as the eligibility of any lower tier prospective participants, each participant may, but is not required to, check the Excluded Parties List System website (https://www.epls.gov/), which is compiled by the General Services Administration.

FHWA-1273 -- Revised May 1, 2012
h. Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render in good faith the certification required by this clause. The knowledge and normally possessed by a prudent person in the ordinary course of business dealings.
i. Except for transactions authorized under paragraph e of these instructions, if a participant in a covered transaction knowingly enters into a lower tier covered transaction with a person who is suspended, debarred, ineligible, or voluntarily excluded from participation in this transaction, in addition to other remedies available to the Federal Government, the department or agency with which this transaction originated may pursue available remedies, including suspension and/or debarment.
* * * * *
Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion--Lower Tier Participants:

1. The prospective lower tier participant certifies, by submission of this proposal, that neither it nor its principals is presently debarred, suspended, proposed for debarment, declared
ineligible, or voluntarily excluded from participating in covered transactions by any Federal department or agency.

2. Where the prospective lower tier participant is unable to certify to any of the statements in this certification, such prospective participant shall attach an explanation to this proposal. * * * * *
XI. CERTIFICATION REGARDING USE OF CONTRACT FUNDS

FOR LOBBYING
This provision is applicable to all Federal-aid construction contracts and to all related subcontracts which exceed $100,000 (49 CFR 20).

1. The prospective participant certifies, by signing and submitting this bid or proposal, to the best of his or her knowledge and belief, that:
a. No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in
connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement. b. If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form-LLL, "Disclosure Form to Report Lobbying," in accordance with its instructions.

Page 19 of 25 ends

January 2021
Redlands Regular Meeting of 09-03-24 1870 of 1977
Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language

2. This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by 31 U.S.C. 1352.

Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.

3.The prospective participant also agrees by submitting its bid or proposal that the participant shall require that the language of this certification be included in all lower tier subcontracts, which exceed information of participant is not required to exceed that which is $100,000 and that all such recipients shall certify and disclose accordingly.

Page 20 of 25 ends

January 2021
Redlands Regular Meeting of 09-03-24 1871 of 1977
Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language

12. FEMALE AND MINORITY GOALS
To comply with Section II, "Nondiscrimination," of "Required Contract Provisions Federal-Aid Construction Contracts," the following are for female and minority utilization goals for Federal-aid construction contracts and subcontracts that exceed $10,000:

The nationwide goal for female utilization is 6.9 percent.

The goals for minority utilization [45 Fed Reg 65984 (10/3/1980)] are as follows:

MINORITY UTILIZATION GOALS
Economic
Area
Goal
(Percent)
174 Redding CA:

Non-SMSA (Standard Metropolitan Statistical Area) Counties:

CA Lassen; CA Modoc; CA Plumas; CA Shasta; CA Siskiyou; CA Tehama

6.8 175
Eureka, CA
Non-SMSA Counties:

CA Del Norte; CA Humboldt; CA Trinity

6.6 San Francisco-Oakland-San Jose, CA:

SMSA Counties:
7120 Salinas-Seaside-Monterey, CA 28.9
CA Monterey
7360 San Francisco-Oakland
CA Alameda; CA Contra Costa; CA Marin; CA San Francisco; CA San Mateo

25.6 176
7400 San Jose, CA
CA Santa Clara, CA
7485 Santa Cruz, CA
CA Santa Cruz

19.6 14.9
7500 Santa Rosa
CA Sonoma

9.1 8720 Vallejo-Fairfield-Napa, CA
CA Napa; CA Solano

17.1 Non-SMSA Counties:

CA Lake; CA Mendocino; CA San Benito

23.2 177
Sacramento, CA:

SMSA Counties:
6920 Sacramento, CA
CA Placer; CA Sacramento; CA
Yolo Non-SMSA Counties
CA Butte; CA Colusa; CA El Dorado; CA Glenn; CA Nevada; CA Sierra; CA Sutter; CA Yuba

16.1 14.3
Stockton-Modesto, CA:

SMSA Counties:
5170 Modesto, CA 12.3
178 CA Stanislaus
8120 Stockton, CA
CA San Joaquin

24.3 Non-SMSA Counties
CA Alpine; CA Amador; CA Calaveras; CA Mariposa; CA Merced; CA Tuolumne

19.8 Fresno-Bakersfield, CA
SMSA Counties:
179 0680 Bakersfield, CA
CA Kern
2840 Fresno, CA

19.1 26.1

Page 21 of 25 ends

January 2021
Redlands Regular Meeting of 09-03-24 1872 of 1977
Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language
CA Fresno
Non-SMSA Counties:

CA Kings; CA Madera; CA Tulare

23.6 Los Angeles, CA:

SMSA Counties:
0360 Anaheim-Santa Ana-Garden Grove, CA 11.9
CA Orange
4480 Los Angeles-Long Beach, CA 28.3
180
CA Los Angeles
6000 Oxnard-Simi Valley-Ventura, CA
CA Ventura
6780 Riverside-San Bernardino-Ontario, CA

21.5 19.0
CA Riverside; CA San Bernardino
7480 Santa Barbara-Santa Maria-Lompoc, CA

19.7 CA Santa Barbara
Non-SMSA Counties
CA Inyo; CA Mono; CA San Luis Obispo

24.6 San Diego, CA:

SMSA Counties
181 7320 San Diego, CA
CA San Diego

16.9 Non-SMSA Counties
CA Imperial

18.2 For the last full week of July during which work is performed under the contract, the prime contractor and each non material-supplier subcontractor with a subcontract of $10,000 or more must complete Form FHWA PR-1391 (Appendix C to 23 CFR 230). Submit the forms by August 15.

13. TITLE VI ASSURANCES
During the performance of this Agreement, the contractor, for itself, its assignees and successors in interest (hereinafter collectively referred to as CONTRACTOR) agrees as follows:
a. Compliance with Regulations: CONTRACTOR shall comply with the regulations relative to nondiscrimination in federally assisted programs of the Department of Transportation, Title 49, Code of Federal Regulations, Part 21, as they may be amended from time to time, (hereinafter referred to as the REGULATIONS), which are herein incorporated by reference and made a part of this agreement.
b. Nondiscrimination: CONTRACTOR, with regard to the work performed by it during the AGREEMENT, shall not discriminate on the grounds of race, color, sex, national origin, religion, age, or disability in the selection and retention of sub-applicants, including procurements of materials and leases of equipment. CONTRACTOR shall not participate either directly or indirectly in the discrimination prohibited by Section 21.5 of the Regulations, including employment practices when the agreement covers a program set forth in Appendix B of the Regulations. c. Solicitations for Sub-agreements, Including Procurements of Materials and Equipment: In all solicitations either by competitive bidding or negotiation made by CONTRACTOR for work to be performed under a Sub- agreement, including procurements of materials or leases of equipment, each potential sub-applicant or supplier shall be notified by CONTRACTOR of the CONTRACTOR’S obligations under this Agreement and the Regulations relative to nondiscrimination on the grounds of race, color, or national origin. d. Information and Reports: CONTRACTOR shall provide all information and reports required by the Regulations, or directives issued pursuant thereto, and shall permit access to its books, records, accounts, other sources of information, and its facilities as may be determined by the California Department of Transportation or FHWA to be pertinent to ascertain compliance with such

Page 22 of 25 ends

January 2021
Redlands Regular Meeting of 09-03-24 1873 of 1977
Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language
Regulations or directives. Where any information required of CONTRACTOR is in the exclusive possession of another who fails or refuses to furnish this information, CONTRACTOR shall so certify to the California Department of Transportation or the FHWA as appropriate, and shall set forth what efforts CONTRACTOR has made to obtain the information. e. Sanctions for Noncompliance: In the event of CONTRACTOR’s noncompliance with the nondiscrimination provisions of this agreement, the California Department of Transportation shall impose such agreement sanctions as it or the FHWA may determine to be appropriate, including, but not limited to:
i. withholding of payments to CONTRACTOR under the Agreement within a reasonable period of time, not to exceed 90 days; and/or
ii. cancellation, termination or suspension of the Agreement, in whole or in part. f. Incorporation of Provisions: CONTRACTOR shall include the provisions of paragraphs (1) through (6) in every sub-agreement, including procurements of materials and leases of equipment, unless exempt by the Regulations, or directives issued pursuant thereto.

CONTRACTOR shall take such action with respect to any sub-agreement or procurement as the California Department of Transportation or FHWA may direct as a means of enforcing such provisions including sanctions for noncompliance, provided, however, that, in the event CONTRACTOR becomes involved in, or is threatened with, litigation with a sub-applicant or supplier as a result of such direction, CONTRACTOR may request the California Department of Transportation enter into such litigation to protect the interests of the State, and, in addition, CONTRACTOR may request the United States to enter into such litigation to protect the interests of the United States.

14. USE OF UNITED STATES-FLAG VESSELS (CARGO PREFERENCE ACT) The CONTRACTOR agrees1. To utilize privately owned United States-flag commercial vessels to ship at least 50 percent of the gross tonnage (computed separately for dry bulk carries, dry cargo liners, and tankers) involved, whenever shipping any equipment, material, or commodities pursuant to this contract, to the extent such vessels are available at fair and reasonable rates for United States-flag commercial vessels.

2. To Furnish within 20 days following the date of loading for shipments originating within the United State or within 30 working days following the date of loading for shipments originating outside the United States, a legible copy of a rated “on-board” commercial ocean bill-of-lading in English for each shipment of cargo described in paragraph (1) of this section to both the Contracting Officer (through the prime contractor in the case of subcontractor bills-of-lading) and to the Division of National Cargo, Office of Market Development, Maritime Administration, Washington, DC 20590.

3. To insert the substance of the provisions of this clause in all subcontracts issued pursuant to this contract.

Federal Trainee Program Special Provisions
(to be used when applicable)

15. FEDERAL TRAINEE PROGRAM
For the Federal training program, the number of trainees or apprentices is .

This section applies if a number of trainees or apprentices is specified in the special provisions.

As part of the prime contractor’s equal opportunity affirmative action program, provide on-the-job training to develop full journeymen in the types of trades or job classifications involved.

The prime contractor has primary responsibility for meeting this training requirement.

If the prime contractor subcontracts a contract part, they shall determine how many trainees or apprentices are to be trained by the subcontractor. Include these training requirements in each subcontract.

Where feasible, 25 percent of apprentices or trainees in each occupation must be in their 1st year of apprenticeship or training.

Page 23 of 25 ends

January 2021
Redlands Regular Meeting of 09-03-24 1874 of 1977
Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language
Distribute the number of apprentices or trainees among the work classifications on the basis of the prime contractor’s needs and the availability of journeymen in the various classifications within a reasonable recruitment area.

Before starting work, the prime contractor shall submit to the City/County of :

1. Number of apprentices or trainees to be trained for each classification

2. Training program to be used

3. Training starting date for each classification
The prime contractor shall obtain the City/County of approval for this submitted information before the prime contractor starts work. The City/County of credits the prime contractor for each apprentice or trainee the prime contractor employs on the job who is currently enrolled or becomes enrolled in an approved program.

The primary objective of this section is to train and upgrade minorities and women toward journeyman status.

The prime contractor shall make every effort to enroll minority and women apprentices or trainees, such as conducting systematic and direct recruitment through public and private sources likely to yield minority and women apprentices or trainees, to the extent they are available within a reasonable recruitment area and show that they have made the efforts. In making these efforts, the prime contractor shall not discriminate against any applicant for training.

The prime contractor shall not employ as an apprentice or trainee an employee:

1. In any classification in which the employee has successfully completed a training course leading to journeyman status or in which the employee has been employed as a journeyman

2. Who is not registered in a program approved by the US Department of Labor, Bureau of Apprenticeship and Training
The prime contractor shall ask the employee if the employee has successfully completed a training course leading to journeyman status or has been employed as a journeyman. The prime contractor’s records must show the employee's answers to the questions.

In the training program, the prime contractor shall establish the minimum length and training type for each classification. The City/County of and FHWA approves a program if one of the following is met:

1. It is calculated to:
ƒ Meet the your equal employment opportunity responsibilities ƒ Qualify the average apprentice or trainee for journeyman status in the classification involved by the end of the training period

2. It is registered with the U.S. Department of Labor, Bureau of Apprenticeship and Training, and it is administered in a way consistent with the equal employment responsibilities of Federal-aid highway construction contracts
The prime contractor shall obtain the State's approval for their training program before they start work involving the classification covered by the program.

The prime contractor shall provide training in the construction crafts, not in clerk-typist or secretarial-type positions. Training is allowed in lower level management positions such as office engineers, estimators, and timekeepers if the training is oriented toward construction applications. Training is allowed in the laborer classification if significant and meaningful training is provided and approved by the division office. Off-site training is allowed if the training is an integral part of an approved training program and does not make up a significant part of the overall training.

Page 24 of 25 ends

January 2021
Redlands
Redlands
Redlands
Redlands
Redlands Regular Meeting of 09-03-24 1875 of 1977
Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language
The City/County of reimburses the prime contractor 80 cents per hour of training given an employee on thiscontract under an approved training program:

1. For on-site training

2. For off-site training if the apprentice or trainee is currently employed on a Federal-aid project and prime contractor does at least one of the following:
a. Contribute to the cost of the training
b. Provide the instruction to the apprentice or trainee c. Pay the apprentice's or trainee's wages during the off-site training period

3. If the prime contractor complies with this section.

Each apprentice or trainee must:

1. Begin training on the project as soon as feasible after the start of work involving the apprentice's or trainee's skill

2. Remain on the project as long as training opportunities exist in the apprentice's or trainee's work classification or until the apprentice or trainee has completed the training program The prime contractor shall furnish the apprentice or trainee with a copy of the program that the prime contractor will comply with in providing the training

Page 25 of 25 ends

January 2021
Redlands
Redlands Regular Meeting of 09-03-24 1876 of 1977
7+,63$*(,17(17,21$//</()7%/$1.
Redlands Regular Meeting of 09-03-24 1877 of 1977

APPENDIX E

FEDERAL WAGE RATES
Redlands Regular Meeting of 09-03-24 1878 of 1977

THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 09-03-24 1879 of 1977
"General Decision Number: CA20240026 05/24/2024
Superseded General Decision Number: CA20230026
State: California
Construction Types: Building, Heavy (Heavy and Dredging) and Highway
County: San Bernardino County in California.

BUILDING CONSTRUCTION PROJECTS; DREDGING PROJECTS (does not include hopper dredge work); HEAVY CONSTRUCTION PROJECTS (does not include water well drilling); HIGHWAY CONSTRUCTION PROJECTS Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).
______________________________________________________________ |If the contract is entered |. Executive Order 14026 |
|into on or after January 30, | generally applies to the | |2022, or the contract is | contract. |
|renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at |
|after January 30, 2022: | least $17.20 per hour (or |
| | the applicable wage rate |
| | listed on this wage |
| | determination, if it is |
| | higher) for all hours |
| | spent performing on the |
| | contract in 2024. |
|______________________________|_____________________________| |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. |
|contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.90 per hour (or the |
| | applicable wage rate listed|
| | on this wage determination,|
| | if it is higher) for all |
| | hours spent performing on |
| | that contract in 2024. |
|______________________________|_____________________________| The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Redlands Regular Meeting of 09-03-24 1880 of 1977
Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a
conformance request.

Additional information on contractor requirements and worker protections under the Executive Orders is available at
http://www.dol.gov/whd/govcontracts.

Modification Number Publication Date
0 01/05/2024
1 01/12/2024
2 02/09/2024
3 02/23/2024
4 05/24/2024
ASBE0005-002 09/01/2023
Rates Fringes
Asbestos Workers/Insulator
(Includes the application of
all insulating materials,
protective coverings,
coatings, and finishes to all
types of mechanical systems).....$ 49.58 25.27
Fire Stop Technician
(Application of Firestopping
Materials for wall openings
and penetrations in walls,
floors, ceilings and curtain
walls)...........................$ 36.97 20.36
---------------------------------------------------------------- ASBE0005-004 07/04/2022
Rates Fringes
Asbestos Removal
worker/hazardous material
handler (Includes
preparation, wetting,
stripping, removal,
scrapping, vacuuming, bagging
and disposing of all
insulation materials from
mechanical systems, whether
they contain asbestos or not)....$ 23.52 13.37
---------------------------------------------------------------- BOIL0092-003 01/01/2024
Rates Fringes
BOILERMAKER......................$ 51.98 42.11
Redlands Regular Meeting of 09-03-24 1881 of 1977
---------------------------------------------------------------- * BRCA0004-011 05/01/2024
Rates Fringes
BRICKLAYER; MARBLE SETTER........$ 45.53 20.29
*The wage scale for prevailing wage projects performed in Blythe, China lake, Death Valley, Fort Irwin, Twenty-Nine Palms, Needles and 1-15 corridor (Barstow to the Nevada State Line) will be Three Dollars ($3.00) above the
standard San Bernardino/Riverside County hourly wage rate ---------------------------------------------------------------- * BRCA0018-004 06/01/2023
Rates Fringes
MARBLE FINISHER..................$ 40.21 15.23
TILE FINISHER....................$ 34.78 13.64
TILE LAYER.......................$ 48.29 19.18
---------------------------------------------------------------- * BRCA0018-010 09/01/2023
Rates Fringes
TERRAZZO FINISHER................$ 39.95 14.65
TERRAZZO WORKER/SETTER...........$ 47.85 15.14
---------------------------------------------------------------- CARP0213-001 07/01/2021
Rates Fringes

CARPENTER
(1) Carpenter, Cabinet
Installer, Insulation
Installer, Hardwood Floor
Worker and acoustical
installer...................$ 51.60 16.28
(2) Millwright..............$ 52.10 16.48
(3) Piledrivermen/Derrick
Bargeman, Bridge or Dock
Carpenter, Heavy Framer,
Rock Bargeman or Scowman,
Rockslinger, Shingler
(Commercial)................$ 51.73 16.28
(4) Pneumatic Nailer,
Power Stapler...............$ 51.85 16.28
(5) Sawfiler...............$ 51.69 16.28
(6) Scaffold Builder.......$ 42.80 16.28
(7) Table Power Saw
Operator....................$ 51.70 16.28
FOOTNOTE: Work of forming in the construction of open cut Redlands Regular Meeting of 09-03-24 1882 of 1977
sewers or storm drains, on operations in which horizontal lagging is used in conjunction with steel H-Beams driven or placed in pre- drilled holes, for that portion of a lagged trench against which concrete is poured, namely, as a
substitute for back forms (which work is performed by
piledrivers): $0.13 per hour additional.
---------------------------------------------------------------- CARP0213-002 07/01/2021
Rates Fringes
Diver
(1) Wet.....................$ 834.40 16.28
(2) Standby.................$ 445.84 16.28
(3) Tender..................$ 437.84 16.28
(4) Assistant Tender........$ 413.84 16.28
Amounts in ""Rates' column are per day
---------------------------------------------------------------- CARP0213-004 07/01/2021
Rates Fringes
Drywall
DRYWALL INSTALLER/LATHER....$ 51.60 16.28
STOCKER/SCRAPPER............$ 22.16 8.62
---------------------------------------------------------------- CARP0721-001 07/01/2021
Rates Fringes
Modular Furniture Installer......$ 21.85 7.15
---------------------------------------------------------------- ELEC0440-004 12/27/2021

COMMUNICATIONS AND SYSTEMS WORK
Rates Fringes
Communications System
Installer...................$ 39.60 3%+16.89
Technician..................$ 33.09 15.89
SCOPE OF WORK:

Installation, testing, service and maintenance of systems utilizing the transmission and/or transference of voice, sound, vision and digital for commercial, educational,
security and entertainment purposes for the following: TV monitoring and surveillance, background-foreground music, intercom and telephone interconnect, inventory control
systems, microwave transmission, multi-media, multiplex, nurse call systems, radio page, school intercom and sound, burglar alarms, fire alarms, and low voltage master clock Redlands Regular Meeting of 09-03-24 1883 of 1977
systems in commercial buildings. Communication Systems
that transmit or receive information and/or control systems that are intrinsic to the above listed systems; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding all other data
systems or multiple systems which include control function or power supply; excluding installation of raceway systems, conduit systems, line voltage work, and energy management systems. Does not cover work performed at China Lake Naval Ordnance Test Station.
---------------------------------------------------------------- ELEC0477-002 06/01/2021
Rates Fringes
Electricians:....................$ 45.75 3%+25.33
CABLE SPLICER: $1.50 per hour above Electrician rate.

TUNNEL WORK: 10% above Electrician rate.

ZONE PAY:

Zone A - 80 road miles from Post Office, 455 Orange Show Lane, San Bernardino, will be a free zone for all
contractors
Zone B - Any work performed outside Zone A's 80 road miles, shall add $12.00 per hour to the current wage scale.
---------------------------------------------------------------- ELEC1245-001 06/01/2022
Rates Fringes

LINE CONSTRUCTION
(1) Lineman; Cable splicer..$ 64.40 22.58
(2) Equipment specialist
(operates crawler
tractors, commercial motor
vehicles, backhoes,
trenchers, cranes (50 tons
and below), overhead &
underground distribution
line equipment).............$ 50.00 21.30
(3) Groundman...............$ 38.23 20.89
(4) Powderman...............$ 51.87 18.79
HOLIDAYS: New Year's Day, M.L. King Day, Memorial Day,
Independence Day, Labor Day, Veterans Day, Thanksgiving Day and day after Thanksgiving, Christmas Day
---------------------------------------------------------------- ELEV0018-001 01/01/2024
Rates Fringes
Redlands Regular Meeting of 09-03-24 1884 of 1977
ELEVATOR MECHANIC................$ 66.63 37.885+a+b
FOOTNOTE:
a. PAID VACATION: Employer contributes 8% of regular hourly rate as vacation pay credit for employees with more than 5 years of service, and 6% for 6 months to 5 years of service. b. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, Friday after Thanksgiving, and Christmas Day.
---------------------------------------------------------------- ENGI0012-004 08/01/2023
Rates Fringes
OPERATOR: Power Equipment
(DREDGING)
(1) Leverman................$ 64.10 34.60
(2) Dredge dozer............$ 58.13 34.60
(3) Deckmate................$ 58.02 34.60
(4) Winch operator (stern
winch on dredge)............$ 57.47 34.60
(5) Fireman-Oiler,
Deckhand, Bargeman,
Leveehand...................$ 56.93 34.60
(6) Barge Mate..............$ 57.54 34.60
---------------------------------------------------------------- ENGI0012-024 07/01/2023
Rates Fringes
OPERATOR: Power Equipment
(All Other Work)
GROUP 1....................$ 53.90 32.80
GROUP 2....................$ 54.68 32.80
GROUP 3....................$ 54.97 32.80
GROUP 4....................$ 56.46 32.80
GROUP 6....................$ 56.68 32.80
GROUP 8....................$ 56.79 32.80
GROUP 10....................$ 56.91 32.80
GROUP 12....................$ 57.08 32.80
GROUP 13....................$ 57.18 32.80
GROUP 14....................$ 57.21 32.80
GROUP 15....................$ 57.29 32.80
GROUP 16....................$ 57.41 32.80
GROUP 17....................$ 57.58 32.80
GROUP 18....................$ 57.68 32.80
GROUP 19....................$ 57.79 32.80
GROUP 20....................$ 57.91 32.80
GROUP 21....................$ 58.08 32.80
GROUP 22....................$ 58.18 32.80
GROUP 23....................$ 58.29 32.80
Redlands Regular Meeting of 09-03-24 1885 of 1977
GROUP 24....................$ 58.41 32.80
GROUP 25....................$ 58.58 32.80
OPERATOR: Power Equipment
(Cranes, Piledriving &
Hoisting)
GROUP 1....................$ 55.25 32.80
GROUP 2....................$ 56.03 32.80
GROUP 3....................$ 56.32 32.80
GROUP 4....................$ 56.46 32.80
GROUP 5....................$ 56.68 32.80
GROUP 6....................$ 56.79 32.80
GROUP 7....................$ 56.91 32.80
GROUP 8....................$ 57.08 32.80
GROUP 9....................$ 57.25 32.80
GROUP 10....................$ 58.25 32.80
GROUP 11....................$ 59.25 32.80
GROUP 12....................$ 60.25 32.80
GROUP 13....................$ 61.25 32.80
OPERATOR: Power Equipment
(Tunnel Work)
GROUP 1....................$ 55.75 32.80
GROUP 2....................$ 56.53 32.80
GROUP 3....................$ 56.82 32.80
GROUP 4....................$ 56.96 32.80
GROUP 5....................$ 57.18 32.80
GROUP 6....................$ 57.29 32.80
GROUP 7....................$ 57.41 32.80
PREMIUM PAY:
$10.00 per hour shall be paid on all Power Equipment Operator work on the followng Military Bases: China Lake Naval
Reserve, Vandenberg AFB, Point Arguello, Seely Naval Base, Fort Irwin, Nebo Annex Marine Base, Marine Corp Logistics Base Yermo, Edwards AFB, 29 Palms Marine Base and Camp
Pendleton
Workers required to suit up and work in a hazardous material environment: $2.00 per hour additional. Combination mixer and compressor operator on gunite work shall be classified as a concrete mobile mixer operator.

SEE ZONE DEFINITIONS AFTER CLASSIFICATIONS

POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Bargeman; Brakeman; Compressor operator; Ditch Witch, with seat or similar type equipment; Elevator
operator-inside; Engineer Oiler; Forklift operator
(includes loed, lull or similar types under 5 tons;
Generator operator; Generator, pump or compressor plant operator; Pump operator; Signalman; Switchman
GROUP 2: Asphalt-rubber plant operator (nurse tank
operator);Coil Tubing Rig Operator, Concrete mixer
Redlands Regular Meeting of 09-03-24 1886 of 1977
operator-skip type; Conveyor operator; Fireman; Forklift operator (includes loed, lull or similar types over 5 tons; Hydrostatic pump operator; oiler crusher (asphalt or
concrete plant); Petromat laydown machine; PJU side dum jack; Screening and conveyor machine operator (or similar types); Skiploader (wheel type up to 3/4 yd. without
attachment); Tar pot fireman; Temporary heating plant
operator; Trenching machine oiler
GROUP 3: Asphalt-rubber blend operator; Bobcat or similar type (Skid steer); Equipment greaser (rack); Ford Ferguson (with dragtype attachments); Helicopter radioman (ground); Stationary pipe wrapping and cleaning machine operator
GROUP 4: Asphalt plant fireman; Backhoe operator (mini-max or similar type); Boring machine operator; Boxman or mixerman (asphalt or concrete); Chip spreading machine operator; Concrete cleaning decontamination machine operator;
Concrete Pump Operator (small portable);Direct Push
Operator (Geoprobe or similar types) Drilling machine
operator, small auger types (Texoma super economatic or similar types - Hughes 100 or 200 or similar types -
drilling depth of 30' maximum); Equipment greaser (grease truck); Guard rail post driver operator; Highline cableway signalman; Hydra-hammer-aero stomper; Micro Tunneling
(above ground tunnel); Power concrete curing machine
operator; Power concrete saw operator; Power-driven jumbo form setter operator; Power sweeper operator; Rock Wheel Saw/Trencher; Roller operator (compacting); Screed operator (asphalt or concrete); Trenching machine operator (up to 6 ft.); Vacuum or much truck

GROUP 6: Articulating material hauler; Asphalt plant
engineer; Batch plant operator; Bit sharpener; Concrete joint machine operator (canal and similar type); Concrete planer operator; Dandy digger; Deck engine operator;
Derrickman (oilfield type); Drilling machine operator,
bucket or auger types (Calweld 100 bucket or similar types - Watson 1000 auger or similar types - Texoma 330, 500 or 600 auger or similar types - drilling depth of 45'
maximum); Drilling machine operator; Hydrographic seeder machine operator (straw, pulp or seed), Jackson track
maintainer, or similar type; Kalamazoo Switch tamper, or similar type; Machine tool operator; Maginnis internal full slab vibrator, Mechanical berm, curb or gutter(concrete or asphalt); Mechanical finisher operator (concrete,
Clary-Johnson-Bidwell or similar); Micro tunnel system
(below ground); Pavement breaker operator (truck mounted); Road oil mixing machine operator; Roller operator (asphalt or finish), rubber-tired earth moving equipment (single engine, up to and including 25 yds. struck); Self-propelled tar pipelining machine operator; Skiploader operator
(crawler and wheel type, over 3/4 yd. and up to and
Redlands Regular Meeting of 09-03-24 1887 of 1977
including 1-1/2 yds.); Slip form pump operator (power
driven hydraulic lifting device for concrete forms);
Tractor operator-bulldozer, tamper-scraper (single engine, up to 100 h.p. flywheel and similar types, up to and
including D-5 and similar types); Tugger hoist operator (1 drum); Ultra high pressure waterjet cutting tool system operator; Vacuum blasting machine operator
GROUP 8: Asphalt or concrete spreading operator (tamping or finishing); Asphalt paving machine operator (Barber Greene or similar type); Asphalt-rubber distribution operator; Backhoe operator (up to and including 3/4 yd.), small ford, Case or similar types; Cable Bundling Machine Operator
(excluding handheld); Cable Trenching Machine Operator
(Spider Plow or similar types) Cast-in-place pipe laying machine operator; Combination mixer and compressor operator (gunite work); Compactor operator (self-propelled);
Concrete mixer operator (paving); Crushing plant operator; Drill Doctor; Drilling machine operator, Bucket or auger types (Calweld 150 bucket or similar types - Watson 1500, 2000 2500 auger or similar types - Texoma 700, 800 auger or similar types - drilling depth of 60' maximum); Elevating grader operator; Grade checker; Gradall operator; Grouting machine operator; Heavy-duty repairman; Heavy equipment robotics operator; Kalamazoo balliste regulator or similar type; Kolman belt loader and similar type; Le Tourneau blob compactor or similar type; Loader operator (Athey, Euclid, Sierra and similar types); Mobark Chipper or similar; Ozzie padder or similar types; P.C. slot saw; Pneumatic concrete placing machine operator (Hackley-Presswell or similar
type); Pumpcrete gun operator; RCM Cementing Unit Operator, Rail/Switch Grinder Operator (Harsco or similar types)
Rock Drill or similar types; Rotary drill operator
(excluding caisson type); Rubber-tired earth-moving
equipment operator (single engine, caterpillar, Euclid, Athey Wagon and similar types with any and all attachments over 25 yds. up to and including 50 cu. yds. struck);
Rubber-tired earth-moving equipment operator (multiple
engine up to and including 25 yds. struck); Rubber-tired scraper operator (self-loading paddle wheel type-John
Deere, 1040 and similar single unit); Self- propelled curb and gutter machine operator; Shuttle buggy; Skiploader
operator (crawler and wheel type over 1-1/2 yds. up to and including 6-1/2 yds.); Soil remediation plant operator; Surface heaters and planer operator; Tractor compressor drill combination operator; Tractor operator (any type
larger than D-5 - 100 flywheel h.p. and over, or
similar-bulldozer, tamper, scraper and push tractor single engine); Tractor operator (boom attachments), Traveling pipe wrapping, cleaning and bendng machine operator;
Trenching machine operator (over 6 ft. depth capacity,
manufacturer's rating); trenching Machine with Road Miner attachment (over 6 ft depth capacity): Ultra high pressure waterjet cutting tool system mechanic; Water pull
Redlands Regular Meeting of 09-03-24 1888 of 1977
(compaction) operator
GROUP 10: Drilling machine operator, Bucket or auger types (Calweld 200 B bucket or similar types-Watson 3000 or 5000 auger or similar types-Texoma 900 auger or similar
types-drilling depth of 105' maximum); Dual drum mixer, dynamic compactor LDC350 (or similar types); Monorail
locomotive operator (diesel, gas or electric); Motor
patrol-blade operator (single engine); Multiple engine
tractor operator (Euclid and similar type-except Quad 9 cat.); Rubber-tired earth-moving equipment operator (single engine, over 50 yds. struck); Pneumatic pipe ramming tool and similar types; Prestressed wrapping machine operator; Rubber-tired earth-moving equipment operator (single
engine, over 50 yds. struck); Rubber tired earth moving equipment operator (multiple engine, Euclid, caterpillar and similar over 25 yds. and up to 50 yds. struck), Tower crane repairman; Tractor loader operator (crawler and wheel type over 6-1/2 yds.); Woods mixer operator (and similar Pugmill equipment)
GROUP 12: Auto grader operator; Automatic slip form operator; Drilling machine operator, bucket or auger types (Calweld, auger 200 CA or similar types - Watson, auger 6000 or
similar types - Hughes Super Duty, auger 200 or similar types - drilling depth of 175' maximum); Hoe ram or similar with compressor; Mass excavator operator less tha 750 cu. yards; Mechanical finishing machine operator; Mobile form traveler operator; Motor patrol operator (multi-engine); Pipe mobile machine operator; Rubber-tired earth- moving equipment operator (multiple engine, Euclid, Caterpillar and similar type, over 50 cu. yds. struck); Rubber-tired self- loading scraper operator (paddle-wheel-auger type self-loading - two (2) or more units)
GROUP 13: Rubber-tired earth-moving equipment operator
operating equipment with push-pull system (single engine, up to and including 25 yds. struck)
GROUP 14: Canal liner operator; Canal trimmer operator; Remote- control earth-moving equipment operator (operating a second piece of equipment: $1.00 per hour additional); Wheel excavator operator (over 750 cu. yds.)
GROUP 15: Rubber-tired earth-moving equipment operator, operating equipment with push-pull system (single engine, Caterpillar, Euclid, Athey Wagon and similar types with any and all attachments over 25 yds. and up to and including 50 yds. struck); Rubber-tired earth-moving equipment operator, operating equipment with push-pull system (multiple
engine-up to and including 25 yds. struck)
GROUP 16: Rubber-tired earth-moving equipment operator, operating equipment with push-pull system (single engine, Redlands Regular Meeting of 09-03-24 1889 of 1977
over 50 yds. struck); Rubber-tired earth-moving equipment operator, operating equipment with push-pull system
(multiple engine, Euclid, Caterpillar and similar, over 25 yds. and up to 50 yds. struck)
GROUP 17: Rubber-tired earth-moving equipment operator, operating equipment with push-pull system (multiple engine, Euclid, Caterpillar and similar, over 50 cu. yds. struck); Tandem tractor operator (operating crawler type tractors in tandem - Quad 9 and similar type)
GROUP 18: Rubber-tired earth-moving equipment operator, operating in tandem (scrapers, belly dumps and similar
types in any combination, excluding compaction units -
single engine, up to and including 25 yds. struck)
GROUP 19: Rotex concrete belt operator (or similar types); Rubber-tired earth-moving equipment operator, operating in tandem (scrapers, belly dumps and similar types in any
combination, excluding compaction units - single engine, Caterpillar, Euclid, Athey Wagon and similar types with any and all attachments over 25 yds.and up to and including 50 cu. yds. struck); Rubber-tired earth-moving equipment
operator, operating in tandem (scrapers, belly dumps and similar types in any combination, excluding compaction
units - multiple engine, up to and including 25 yds. struck) GROUP 20: Rubber-tired earth-moving equipment operator, operating in tandem (scrapers, belly dumps and similar
types in any combination, excluding compaction units -
single engine, over 50 yds. struck); Rubber-tired
earth-moving equipment operator, operating in tandem
(scrapers, belly dumps, and similar types in any
combination, excluding compaction units - multiple engine, Euclid, Caterpillar and similar, over 25 yds. and up to 50 yds. struck)
GROUP 21: Rubber-tired earth-moving equipment operator, operating in tandem (scrapers, belly dumps and similar
types in any combination, excluding compaction units -
multiple engine, Euclid, Caterpillar and similar type, over 50 cu. yds. struck)
GROUP 22: Rubber-tired earth-moving equipment operator, operating equipment with the tandem push-pull system
(single engine, up to and including 25 yds. struck)
GROUP 23: Rubber-tired earth-moving equipment operator, operating equipment with the tandem push-pull system
(single engine, Caterpillar, Euclid, Athey Wagon and
similar types with any and all attachments over 25 yds. and up to and including 50 yds. struck); Rubber-tired
earth-moving equipment operator, operating with the tandem push-pull system (multiple engine, up to and including 25 Redlands Regular Meeting of 09-03-24 1890 of 1977
yds. struck)
GROUP 24: Rubber-tired earth-moving equipment operator, operating equipment with the tandem push-pull system
(single engine, over 50 yds. struck); Rubber-tired
earth-moving equipment operator, operating equipment with the tandem push-pull system (multiple engine, Euclid,
Caterpillar and similar, over 25 yds. and up to 50 yds. struck)
GROUP 25: Concrete pump operator-truck mounted; Rubber-tired earth-moving equipment operator, operating equipment with the tandem push-pull system (multiple engine, Euclid,
Caterpillar and similar type, over 50 cu. yds. struck); Spyder Excavator Operator, with all attachments

CRANES, PILEDRIVING AND HOISTING EQUIPMENT CLASSIFICATIONS GROUP 1: Engineer oiler; Fork lift operator (includes loed, lull or similar types)
GROUP 2: Truck crane oiler
GROUP 3: A-frame or winch truck operator; Ross carrier
operator (jobsite)
GROUP 4: Bridge-type unloader and turntable operator;
Helicopter hoist operator
GROUP 5: Hydraulic boom truck; Stinger crane (Austin-Western or similar type); Tugger hoist operator (1 drum)
GROUP 6: Bridge crane operator; Cretor crane operator; Hoist operator (Chicago boom and similar type); Lift mobile
operator; Lift slab machine operator (Vagtborg and similar types); Material hoist and/or manlift operator; Polar
gantry crane operator; Self Climbing scaffold (or similar type); Shovel, backhoe, dragline, clamshell operator (over 3/4 yd. and up to 5 cu. yds. mrc); Tugger hoist operator GROUP 7: Pedestal crane operator; Shovel, backhoe, dragline, clamshell operator (over 5 cu. yds. mrc); Tower crane
repair; Tugger hoist operator (3 drum)
GROUP 8: Crane operator (up to and including 25 ton
capacity); Crawler transporter operator; Derrick barge
operator (up to and including 25 ton capacity); Hoist
operator, stiff legs, Guy derrick or similar type (up to and including 25 ton capacity); Shovel, backhoe, dragline, clamshell operator (over 7 cu. yds., M.R.C.)
GROUP 9: Crane operator (over 25 tons and up to and including 50 tons mrc); Derrick barge operator (over 25 tons up to and including 50 tons mrc); Highline cableway operator; Redlands Regular Meeting of 09-03-24 1891 of 1977
Hoist operator, stiff legs, Guy derrick or similar type (over 25 tons up to and including 50 tons mrc); K-crane operator; Polar crane operator; Self erecting tower crane operator maximum lifting capacity ten tons
GROUP 10: Crane operator (over 50 tons and up to and
including 100 tons mrc); Derrick barge operator (over 50 tons up to and including 100 tons mrc); Hoist operator, stiff legs, Guy derrick or similar type (over 50 tons up to and including 100 tons mrc), Mobile tower crane operator (over 50 tons, up to and including 100 tons M.R.C.);
GROUP 11: Crane operator (over 100 tons and up to and
including 200 tons mrc); Derrick barge operator (over 100 tons up to and including 200 tons mrc); Hoist operator, stiff legs, Guy derrick or similar type (over 100 tons up to and including 200 tons mrc); Mobile tower crane operator (over 100 tons up to and including 200 tons mrc) ; Tower crane operator and tower gantry
GROUP 12: Crane operator (over 200 tons up to and including 300 tons mrc); Derrick barge operator (over 200 tons up to and including 300 tons mrc); Hoist operator, stiff legs, Guy derrick or similar type (over 200 tons, up to and
including 300 tons mrc); Mobile tower crane operator (over 200 tons, up to and including 300 tons mrc)
GROUP 13: Crane operator (over 300 tons); Derrick barge operator (over 300 tons); Helicopter pilot; Hoist operator, stiff legs, Guy derrick or similar type (over 300 tons); Mobile tower crane operator (over 300 tons)

TUNNEL CLASSIFICATIONS
GROUP 1: Skiploader (wheel type up to 3/4 yd. without
attachment)
GROUP 2: Power-driven jumbo form setter operator
GROUP 3: Dinkey locomotive or motorperson (up to and
including 10 tons)
GROUP 4: Bit sharpener; Equipment greaser (grease truck); Slip form pump operator (power-driven hydraulic lifting device for concrete forms); Tugger hoist operator (1 drum); Tunnel locomotive operator (over 10 and up to and including 30 tons)
GROUP 5: Backhoe operator (up to and including 3/4 yd.); Small Ford, Case or similar; Drill doctor; Grouting machine operator; Heading shield operator; Heavy-duty repairperson; Loader operator (Athey, Euclid, Sierra and similar types); Mucking machine operator (1/4 yd., rubber-tired, rail or track type); Pneumatic concrete placing machine operator Redlands Regular Meeting of 09-03-24 1892 of 1977
(Hackley-Presswell or similar type); Pneumatic heading
shield (tunnel); Pumpcrete gun operator; Tractor compressor drill combination operator; Tugger hoist operator (2 drum); Tunnel locomotive operator (over 30 tons)
GROUP 6: Heavy Duty Repairman
GROUP 7: Tunnel mole boring machine operator

ENGINEERS ZONES
$1.00 additional per hour for all of IMPERIAL County and the portions of KERN, RIVERSIDE & SAN BERNARDINO Counties as defined below:

That area within the following Boundary: Begin in San
Bernardino County, approximately 3 miles NE of the intersection of I-15 and the California State line at that point which is the NW corner of Section 1, T17N,m R14E, San Bernardino Meridian. Continue W in a straight line to that point which is the SW corner of the northwest quarter of Section 6, T27S, R42E, Mt. Diablo Meridian. Continue North to the intersection with the Inyo County Boundary at that point which is the NE corner of the western half of the northern quarter of Section 6, T25S, R42E, MDM. Continue W along the Inyo and San
Bernardino County boundary until the intersection with Kern County, as that point which is the SE corner of Section 34, T24S, R40E, MDM. Continue W along the Inyo and Kern County boundary until the intersection with Tulare County, at that point which is the SW corner of the SE quarter of Section 32, T24S, R37E, MDM. Continue W along the Kern and Tulare County boundary, until that point which is the NW corner of T25S, R32E, MDM. Continue S following R32E lines to the NW corner of T31S, R32E, MDM. Continue W to the NW corner of T31S, R31E, MDM. Continue S to the SW corner of T32S, R31E, MDM. Continue W to SW corner of SE quarter of Section 34, T32S, R30E, MDM.

Continue S to SW corner of T11N, R17W, SBM. Continue E along south boundary of T11N, SBM to SW corner of T11N, R7W, SBM.

Continue S to SW corner of T9N, R7W, SBM. Continue E along south boundary of T9N, SBM to SW corner of T9N, R1E, SBM.

Continue S along west boundary of R1E, SMB to Riverside County line at the SW corner of T1S, R1E, SBM. Continue E along south boundary of T1s, SBM (Riverside County Line) to SW corner of T1S, R10E, SBM. Continue S along west boundary of R10E, SBM to Imperial County line at the SW corner of T8S, R10E, SBM.

Continue W along Imperial and Riverside county line to NW corner of T9S, R9E, SBM. Continue S along the boundary between Imperial and San Diego Counties, along the west edge of R9E, SBM to the south boundary of Imperial County/California state line. Follow the California state line west to Arizona state line, then north to Nevada state line, then continuing NW back to start at the point which is the NW corner of Section 1, T17N, R14E, SBM
Redlands Regular Meeting of 09-03-24 1893 of 1977
$1.00 additional per hour for portions of SAN LUIS OBISPO, KERN, SANTA BARBARA & VENTURA as defined below:

That area within the following Boundary: Begin approximately 5 miles north of the community of Cholame, on the Monterey County and San Luis Obispo County boundary at the NW corner of T25S, R16E, Mt. Diablo Meridian. Continue south along the west side of R16E to the SW corner of T30S, R16E, MDM. Continue E to SW corner of T30S, R17E, MDM. Continue S to SW corner of T31S, R17E, MDM. Continue E to SW corner of T31S, R18E, MDM.

Continue S along West side of R18E, MDM as it crosses into San Bernardino Meridian numbering area and becomes R30W. Follow the west side of R30W, SBM to the SW corner of T9N, R30W, SBM.

Continue E along the south edge of T9N, SBM to the Santa Barbara County and Ventura County boundary at that point whch is the SW corner of Section 34.T9N, R24W, SBM, continue S along the Ventura County line to that point which is the SW corner of the SE quarter of Section 32, T7N, R24W, SBM. Continue E along the south edge of T7N, SBM to the SE corner to T7N, R21W, SBM. Continue N along East side of R21W, SBM to Ventura County and Kern County boundary at the NE corner of T8N, R21W.

Continue W along the Ventura County and Kern County boundary to the SE corner of T9N, R21W. Continue North along the East edge of R21W, SBM to the NE corner of T12N, R21W, SBM. Continue West along the north edge of T12N, SBM to the SE corner of T32S, R21E, MDM. [T12N SBM is a think strip between T11N SBM and T32S MDM]. Continue North along the East side of R21E, MDM to the Kings County and Kern County border at the NE corner of T25S, R21E, MDM, continue West along the Kings County and Kern County Boundary until the intersection of San Luis Obispo County. Continue west along the Kings County and San Luis Obispo County boundary until the intersection with Monterey County. Continue West along the Monterey County and San Luis Obispo County boundary to the beginning point at the NW corner of T25S, R16E, MDM.

$2.00 additional per hour for INYO and MONO Counties and the Northern portion of SAN BERNARDINO County as defined below:

That area within the following Boundary: Begin at the
intersection of the northern boundary of Mono County and the California state line at the point which is the center of Section 17, T10N, R22E, Mt. Diablo Meridian. Continue S then SE along the entire western boundary of Mono County, until it reaches Inyo County at the point which is the NE corner of the Western half of the NW quarter of Section 2, T8S, R29E, MDM.

Continue SSE along the entire western boundary of Inyo County, until the intersection with Kern County at the point which is the SW corner of the SE 1/4 of Section 32, T24S, R37E, MDM.

Continue E along the Inyo and Kern County boundary until the intersection with San Bernardino County at that point which is the SE corner of section 34, T24S, R40E, MDM. Continue E along the Inyo and San Bernardino County boundary until the point Redlands Regular Meeting of 09-03-24 1894 of 1977
which is the NE corner of the Western half of the NW quarter of Section 6, T25S, R42E, MDM. Continue S to that point which is the SW corner of the NW quarter of Section 6, T27S, R42E, MDM.

Continue E in a straight line to the California and Nevada state border at the point which is the NW corner of Section 1, T17N, R14E, San Bernardino Meridian. Then continue NW along the state line to the starting point, which is the center of Section 18, T10N, R22E, MDM.

REMAINING AREA NOT DEFINED ABOVE RECIEVES BASE RATE
---------------------------------------------------------------- IRON0433-006 01/01/2024
Rates Fringes

IRONWORKER
Fence Erector...............$ 42.53 26.26
Ornamental, Reinforcing
and Structural..............$ 47.45 34.90
PREMIUM PAY:
$9.00 additional per hour at the following locations:

China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland,
Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg AFB Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics Center
Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock ---------------------------------------------------------------- LABO0300-005 08/01/2022
Rates Fringes
Asbestos Removal Laborer.........$ 39.23 23.28
SCOPE OF WORK: Includes site mobilization, initial site cleanup, site preparation, removal of asbestos-containing material and toxic waste, encapsulation, enclosure and
disposal of asbestos- containing materials and toxic waste by hand or with equipment or machinery; scaffolding,
fabrication of temporary wooden barriers and assembly of decontamination stations.
---------------------------------------------------------------- Redlands Regular Meeting of 09-03-24 1895 of 1977
LABO0345-001 07/01/2022
Rates Fringes

LABORER (GUNITE)
GROUP 1.....................$ 48.50 21.37
GROUP 2.....................$ 47.55 21.37
GROUP 3.....................$ 44.01 21.37
FOOTNOTE: GUNITE PREMIUM PAY: Workers working from a
Bosn'n's Chair or suspended from a rope or cable shall
receive 40 cents per hour above the foregoing applicable classification rates. Workers doing gunite and/or
shotcrete work in a tunnel shall receive 35 cents per hour above the foregoing applicable classification rates, paid on a portal-to-portal basis. Any work performed on, in or above any smoke stack, silo, storage elevator or similar type of structure, when such structure is in excess of
75'-0"" above base level and which work must be performed in whole or in part more than 75'-0"" above base level, that work performed above the 75'-0"" level shall be compensated for at 35 cents per hour above the applicable
classification wage rate.

GUNITE LABORER CLASSIFICATIONS
GROUP 1: Rodmen, Nozzlemen
GROUP 2: Gunmen
GROUP 3: Reboundmen
---------------------------------------------------------------- LABO0783-002 07/01/2022
Rates Fringes

LABORER (TUNNEL)
GROUP 1.....................$ 45.68 23.30
GROUP 2.....................$ 46.00 23.30
GROUP 3.....................$ 46.46 23.30
GROUP 4.....................$ 47.15 23.30

LABORER
GROUP 1.....................$ 36.39 21.04
GROUP 2.....................$ 36.94 21.04
GROUP 3.....................$ 37.49 21.04
GROUP 4.....................$ 39.04 21.04
GROUP 5.....................$ 39.39 21.04

LABORER CLASSIFICATIONS
GROUP 1: Cleaning and handling of panel forms; Concrete screeding for rough strike-off; Concrete, water curing; Demolition laborer, the cleaning of brick if performed by a Redlands Regular Meeting of 09-03-24 1896 of 1977
worker performing any other phase of demolition work, and the cleaning of lumber; Fire watcher, limber, brush loader, piler and debris handler; Flag person; Gas, oil and/or
water pipeline laborer; Laborer, asphalt-rubber material loader; Laborer, general or construction; Laborer, general clean-up; Laborer, landscaping; Laborer, jetting; Laborer, temporary water and air lines; Material hose operator
(walls, slabs, floors and decks); Plugging, filling of shee bolt holes; Dry packing of concrete; Railroad maintenance, repair track person and road beds; Streetcar and railroad construction track laborers; Rigging and signaling; Scaler; Slip form raiser; Tar and mortar; Tool crib or tool house laborer; Traffic control by any method; Window cleaner; Wire mesh pulling - all concrete pouring operations
GROUP 2: Asphalt shoveler; Cement dumper (on 1 yd. or larger mixer and handling bulk cement); Cesspool digger and
installer; Chucktender; Chute handler, pouring concrete, the handling of the chute from readymix trucks, such as walls, slabs, decks, floors, foundation, footings, curbs, gutters and sidewalks; Concrete curer, impervious membrane and form oiler; Cutting torch operator (demolition); Fine grader, highways and street paving, airport, runways and similar type heavy construction; Gas, oil and/or water
pipeline wrapper - pot tender and form person; Guinea
chaser; Headerboard person - asphalt; Laborer, packing rod steel and pans; Membrane vapor barrier installer; Power broom sweeper (small); Riprap stonepaver, placing stone or wet sacked concrete; Roto scraper and tiller; Sandblaster (pot tender); Septic tank digger and installer(lead); Tank scaler and cleaner; Tree climber, faller, chain saw
operator, Pittsburgh chipper and similar type brush
shredder; Underground laborer, including caisson bellower GROUP 3: Buggymobile person; Concrete cutting torch; Concrete pile cutter; Driller, jackhammer, 2-1/2 ft. drill steel or longer; Dri-pak-it machine; Gas, oil and/or water pipeline wrapper, 6-in. pipe and over, by any method, inside and out; High scaler (including drilling of same); Hydro seeder and similar type; Impact wrench multi-plate; Kettle person, pot person and workers applying asphalt, lay-kold,
creosote, lime caustic and similar type materials
(""applying"" means applying, dipping, brushing or handling of such materials for pipe wrapping and waterproofing); Operator of pneumatic, gas, electric tools, vibrating
machine, pavement breaker, air blasting, come-alongs, and similar mechanical tools not separately classified herein; Pipelayer's backup person, coating, grouting, making of joints, sealing, caulking, diapering and including rubber gasket joints, pointing and any and all other services; Rock slinger; Rotary scarifier or multiple head concrete chipping scarifier; Steel headerboard and guideline setter; Tamper, Barko, Wacker and similar type; Trenching machine, hand-propelled
Redlands Regular Meeting of 09-03-24 1897 of 1977
GROUP 4: Asphalt raker, lute person, ironer, asphalt dump person, and asphalt spreader boxes (all types); Concrete core cutter (walls, floors or ceilings), grinder or sander; Concrete saw person, cutting walls or flat work, scoring old or new concrete; Cribber, shorer, lagging, sheeting and trench bracing, hand-guided lagging hammer; Head rock
slinger; Laborer, asphalt- rubber distributor boot person; Laser beam in connection with laborers' work; Oversize
concrete vibrator operator, 70 lbs. and over; Pipelayer performing all services in the laying and installation of pipe from the point of receiving pipe in the ditch until completion of operation, including any and all forms of tubular material, whether pipe, metallic or non-metallic, conduit and any other stationary type of tubular device used for the conveying of any substance or element, whether water, sewage, solid gas, air, or other product whatsoever and without regard to the nature of material from which the tubular material is fabricated; No-joint pipe and stripping of same; Prefabricated manhole installer; Sandblaster
(nozzle person), water blasting, Porta Shot-Blast
GROUP 5: Blaster powder, all work of loading holes, placing and blasting of all powder and explosives of whatever type, regardless of method used for such loading and placing; Driller: All power drills, excluding jackhammer, whether core, diamond, wagon, track, multiple unit, and any and all other types of mechanical drills without regard to the form of motive power; Toxic waste removal

TUNNEL LABORER CLASSIFICATIONS
GROUP 1: Batch plant laborer; Changehouse person; Dump
person; Dump person (outside); Swamper (brake person and switch person on tunnel work); Tunnel materials handling person; Nipper; Pot tender, using mastic or other materials (for example, but not by way of limitation, shotcrete, etc.) GROUP 2: Chucktender, cabletender; Loading and unloading agitator cars; Vibrator person, jack hammer, pneumatic
tools (except driller); Bull gang mucker, track person; Concrete crew, including rodder and spreader
GROUP 3: Blaster, driller, powder person; Chemical grout jet person; Cherry picker person; Grout gun person; Grout mixer person; Grout pump person; Jackleg miner; Jumbo person; Kemper and other pneumatic concrete placer operator; Miner, tunnel (hand or machine); Nozzle person; Operating of
troweling and/or grouting machines; Powder person (primer house); Primer person; Sandblaster; Shotcrete person; Steel form raiser and setter; Timber person, retimber person, wood or steel; Tunnel Concrete finisher
GROUP 4: Diamond driller; Sandblaster; Shaft and raise work Redlands Regular Meeting of 09-03-24 1898 of 1977
---------------------------------------------------------------- LABO0783-005 07/01/2022
Rates Fringes
Brick Tender.....................$ 37.32 21.45
---------------------------------------------------------------- LABO1184-001 07/01/2022
Rates Fringes
Laborers: (HORIZONTAL

DIRECTIONAL DRILLING)
(1) Drilling Crew Laborer...$ 40.69 18.25
(2) Vehicle Operator/Hauler.$ 40.86 18.25
(3) Horizontal Directional
Drill Operator..............$ 42.71 18.25
(4) Electronic Tracking
Locator.....................$ 44.71 18.25
Laborers: (STRIPING/SLURRY
SEAL)
GROUP 1.....................$ 41.90 21.32
GROUP 2.....................$ 43.20 21.32
GROUP 3.....................$ 45.21 21.32
GROUP 4.....................$ 46.95 21.32

LABORERS - STRIPING CLASSIFICATIONS
GROUP 1: Protective coating, pavement sealing, including repair and filling of cracks by any method on any surface in parking lots, game courts and playgrounds; carstops; operation of all related machinery and equipment; equipment repair technician
GROUP 2: Traffic surface abrasive blaster; pot tender - removal of all traffic lines and markings by any method (sandblasting, waterblasting, grinding, etc.) and
preparation of surface for coatings. Traffic control
person: controlling and directing traffic through both
conventional and moving lane closures; operation of all related machinery and equipment
GROUP 3: Traffic delineating device applicator: Layout and application of pavement markers, delineating signs, rumble and traffic bars, adhesives, guide markers, other traffic delineating devices including traffic control. This
category includes all traffic related surface preparation (sandblasting, waterblasting, grinding) as part of the
application process. Traffic protective delineating system installer: removes, relocates, installs, permanently
affixed roadside and parking delineation barricades,
fencing, cable anchor, guard rail, reference signs,
monument markers; operation of all related machinery and Redlands Regular Meeting of 09-03-24 1899 of 1977
equipment; power broom sweeper
GROUP 4: Striper: layout and application of traffic stripes and markings; hot thermo plastic; tape traffic stripes and markings, including traffic control; operation of all
related machinery and equipment
---------------------------------------------------------------- LABO1414-003 08/03/2022
Rates Fringes

LABORER
PLASTER CLEAN-UP LABORER....$ 38.92 23.32
PLASTER TENDER..............$ 41.47 23.32
Work on a swing stage scaffold: $1.00 per hour additional.

Work at Military Bases - $3.00 additional per hour:

Coronado Naval Amphibious Base, Fort Irwin, Marine Corps Air Station-29 Palms, Imperial Beach Naval Air Station, Marine Corps Logistics Supply Base, Marine Corps Pickle Meadows, Mountain Warfare Training Center, Naval Air
Facility-Seeley, North Island Naval Air Station, Vandenberg AFB.
---------------------------------------------------------------- PAIN0036-001 07/01/2023
Rates Fringes
Painters: (Including Lead
Abatement)
(1) Repaint (excludes San
Diego County)...............$ 29.59 17.12
(2) All Other Work..........$ 38.52 18.64
REPAINT of any previously painted structure. Exceptions:
work involving the aerospace industry, breweries,
commercial recreational facilities, hotels which operate commercial establishments as part of hotel service, and sports facilities.
---------------------------------------------------------------- PAIN0036-008 09/01/2022
Rates Fringes
DRYWALL FINISHER/TAPER...........$ 46.28 23.52
---------------------------------------------------------------- PAIN0036-015 01/01/2020
Rates Fringes
Redlands Regular Meeting of 09-03-24 1900 of 1977
GLAZIER..........................$ 43.45 23.39
FOOTNOTE: Additional $1.25 per hour for work in a condor, from the third (3rd) floor and up Additional $1.25 per
hour for work on the outside of the building from a swing stage or any suspended contrivance, from the ground up
---------------------------------------------------------------- PAIN1247-002 01/01/2024
Rates Fringes
SOFT FLOOR LAYER.................$ 43.20 18.03
---------------------------------------------------------------- PLAS0200-008 08/03/2022
Rates Fringes
PLASTERER........................$ 47.37 19.64
FORT IRWIN; MARINE CORPS AIR STATION 29 PALMS, AND MARINE CORPS LOGISTICS SUPPLY BASE: $3.00 additional per hour. ---------------------------------------------------------------- PLAS0500-002 07/01/2020
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 38.50 25.91
---------------------------------------------------------------- PLUM0016-002 09/01/2023
Rates Fringes

PLUMBER, PIPEFITTER,

STEAMFITTER
Work at Edwards AFB.........$ 64.18 26.51
Work at Fort Irwin Army
Base........................$ 67.68 26.51
Work at Marine Corps
Logistic Base at Nebo,
Marine Corps Logistic Base
at Yermo and Twenty-Nine
Palms Marine Base...........$ 64.18 26.51
Work ONLY on new additions
and remodeling of bars,
restaurants, stores and
commercial buildings, not
to exceed 5,000 sq. ft. of
floor space.................$ 53.51 25.28
Work ONLY on strip malls,
light commercial, tenant
improvement and remodel
work........................$ 42.49 23.86
Redlands Regular Meeting of 09-03-24 1901 of 1977
All other work except work
on new additions and
remodeling of bars,
restaurant, stores and
commercial buildings not
to exceed 5,000 sq. ft. of
floor space and work on
strip malls, light
commercial, tenant
improvement and remodel
work........................$ 55.18 26.26
---------------------------------------------------------------- PLUM0345-001 09/01/2023
Rates Fringes

PLUMBER
Landscape/Irrigation Fitter.$ 40.20 25.90
Sewer & Storm Drain Work....$ 44.29 23.28
---------------------------------------------------------------- ROOF0036-002 08/13/2023
Rates Fringes
ROOFER...........................$ 46.02 20.05
FOOTNOTE: Pitch premium: Work on which employees are exposed to pitch fumes or required to handle pitch, pitch base or pitch impregnated products, or any material containing coal tar pitch, the entire roofing crew shall receive $1.75 per hour ""pitch premium"" pay.
---------------------------------------------------------------- SFCA0669-009 01/01/2024
Does not include the northern part of the City of Chino, or the Cities of Montclair and Ontario
Rates Fringes
SPRINKLER FITTER.................$ 45.31 27.91
---------------------------------------------------------------- SFCA0709-004 09/01/2023

THE NORTHERN PART OF THE CITY OF CHINO, AND THE CITIES OF MONTCLAIR AND ONTARIO:

Rates Fringes
SPRINKLER FITTER (Fire)..........$ 54.29 32.00
---------------------------------------------------------------- SHEE0105-003 01/01/2024
Redlands Regular Meeting of 09-03-24 1902 of 1977
LOS ANGELES (South of a straight line drawn between Gorman and Big Pines)and Catalina Island, INYO, KERN (Northeast part, East of Hwy 395), MONO ORANGE, RIVERSIDE, AND SAN BERNARDINO COUNTIES Rates Fringes

SHEET METAL WORKER
(1) Commercial - New
Construction and Remodel
work........................$ 56.95 30.04
(2) Industrial work
including air pollution
control systems, noise
abatement, hand rails,
guard rails, excluding
aritechtural sheet metal
work, excluding A-C,
heating, ventilating
systems for human comfort...$ 56.95 30.04
---------------------------------------------------------------- TEAM0011-002 07/01/2023
Rates Fringes

TRUCK DRIVER
GROUP 1....................$ 38.19 33.69
GROUP 2....................$ 38.34 33.69
GROUP 3....................$ 38.47 33.69
GROUP 4....................$ 38.66 33.69
GROUP 5....................$ 38.69 33.69
GROUP 6....................$ 38.72 33.69
GROUP 7....................$ 38.97 33.69
GROUP 8....................$ 39.22 33.69
GROUP 9....................$ 39.42 33.69
GROUP 10....................$ 39.72 33.69
GROUP 11....................$ 40.22 33.69
GROUP 12....................$ 40.65 33.69
WORK ON ALL MILITARY BASES:

PREMIUM PAY: $3.00 per hour additional.
[29 palms Marine Base, Camp Roberts, China Lake, Edwards AFB, El Centro Naval Facility, Fort Irwin, Marine Corps
Logistics Base at Nebo & Yermo, Mountain Warfare Training Center, Bridgeport, Point Arguello, Point Conception,
Vandenberg AFB]

TRUCK DRIVERS CLASSIFICATIONS
GROUP 1: Truck driver
Redlands Regular Meeting of 09-03-24 1903 of 1977
GROUP 2: Driver of vehicle or combination of vehicles - 2 axles; Traffic control pilot car excluding moving heavy equipment permit load; Truck mounted broom
GROUP 3: Driver of vehicle or combination of vehicles - 3 axles; Boot person; Cement mason distribution truck; Fuel truck driver; Water truck - 2 axle; Dump truck, less than 16 yds. water level; Erosion control driver
GROUP 4: Driver of transit mix truck, under 3 yds.; Dumpcrete truck, less than 6-1/2 yds. water level
GROUP 5: Water truck, 3 or more axles; Truck greaser and tire person ($0.50 additional for tire person); Pipeline and utility working truck driver, including winch truck and plastic fusion, limited to pipeline and utility work;
Slurry truck driver
GROUP 6: Transit mix truck, 3 yds. or more; Dumpcrete truck, 6-1/2 yds. water level and over; Vehicle or combination of vehicles - 4 or more axles; Oil spreader truck; Dump truck, 16 yds. to 25 yds. water level
GROUP 7: A Frame, Swedish crane or similar; Forklift driver; Ross carrier driver
GROUP 8: Dump truck, 25 yds. to 49 yds. water level; Truck repair person; Water pull - single engine; Welder
GROUP 9: Truck repair person/welder; Low bed driver, 9 axles or over
GROUP 10: Dump truck - 50 yds. or more water level; Water pull - single engine with attachment
GROUP 11: Water pull - twin engine; Water pull - twin engine with attachments; Winch truck driver - $1.25 additional when operating winch or similar special attachments
GROUP 12: Boom Truck 17K and above
---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
================================================================ Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours Redlands Regular Meeting of 09-03-24 1904 of 1977
they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at
https://www.dol.gov/agencies/whd/government-contracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).
---------------------------------------------------------------- The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this
classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that Redlands Regular Meeting of 09-03-24 1905 of 1977
no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average
calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those
classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010
08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

State Adopted Rate Identifiers
Classifications listed under the ""SA"" identifier indicate that the prevailing wage rate set by a state (or local) government was adopted under 29 C.F.R §1.3(g)-(h). Example: SAME2023-007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 01/03/2024 reflects the date on which the classifications and rates under the ?SA? identifier took effect under state law in the state from which the rates were adopted.
----------------------------------------------------------------

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

Redlands Regular Meeting of 09-03-24 1906 of 1977
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.

Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISION"
Redlands Regular Meeting of 09-03-24 1907 of 1977

APPENDIX F

PERMITS
Redlands Regular Meeting of 09-03-24 1908 of 1977

THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 09-03-24 1909 of 1977
…
…
.

YES NO
.
…
…
…
.

YES NO
YES NO
Application for Road / Encroachment Permit
City of Redlands - Municipal Utilities & Engineering Department Name: Phone:

Address: City: Zip:

Contractor: USA ID No.:

Contractor License No.: Type: Cal OSHA No.:

I hereby request permission to construct/install improvements/facilities within the City of Redlands road right-of-way at the following location:

Construction Start Date: Anticipated Completion Date:

Development No.: Plan No.:

Street Name:

Cross Streets:

Address:
and for the purpose of performing the following work:

Applicant/Agent Signature: Date:

In accordance with Plans approved by the Municipal Utilities & Engineering Director and/or the Standard Specifications and Detail Drawings of the City of Redlands for the quantity and type of improvements listed below:

SHADED AREA FOR OFFICIAL USE ONLY
EA Driveway Appr, Res/Comm……………… $ 49.00 / EA =$ Truck Route Permit Required:

SF Sidewalk…………………………………… $ 0.09 / SF =$ YES NO
SF Cross Gutter/Spandrel…………………… $ 0.58 / SF =$
LF Curb & Gutter…………………………… $ 2.19 / LF =$ Closure Permit With LF Curb/Berm………………………………… $ 2.62 / LF =$ Traffic Plan Required:

SF Asphalt Pavement…………………………$ 0.04 / SF =$
SF Crushed Aggregate Base……………… $ 0.04 / SF =$
EA Street Light…………………………………$ 81.00 / EA =$ Water Shutdown Required:

EA Traffic Signal - New………………………. $ 2,152.00 / EA =$
EA Traffic Signal - Modification………………$ 1,737.00 / EA =$ CY Reinforced Concrete…………………… $ 89.00 / CY =$ Bond Required:

LF Storm Drain Pipe…………………………. $ 8.00 / LF =$
EA Curb Inlet/Outlet Structures………………$ 67.00 / EA =$
EA Storm Drain Manhole/Junction Box…….. $ 67.00 / EA =$ EA Curb Core…………………………………. $ 62.00 / EA =$
LF Sewer Main……………………..………… $ 0.95 / LF =$
EA Sewer Manhole…………………..………. $ 67.00 / EA =$ Conduit Material:

EA Sewer Cleanout……………………………$ 134.00 / EA =$
EA Sewer Lateral…………………………… $ 67.00 / EA =$
LF Water Main - Potable…………………….. $ 1.09 / LF =$ Conduit Size:

LF Water Main - Non-Potable……...……….. $ 1.09 / LF =$
EA Fire Hydrant Assembly……………………$ 66.00 / EA =$
EA Water Service Lateral……………………. $ 26.00 / EA =$
EA Water Shutdown………………………….. $ 67.00 / EA =$
EA Fire Service……………………………… $ 58.00 / EA =$
LF Excavation/Utility Trench………..….…….$ 1.25 / LF =$
SF Street Patch……………………………….. $ 0.67 / SF =$
SF Warranty Fee (Street Cut)……………..…$ / SF =$
$ / =$ Calculated By
$ / =$
SUBTOTAL PERMIT FEE $
PERMIT FEE work complete within specified date from issuance = Inspected by $ 219.00 fee. $219.00
Municipal Utilities & Engineering
PENALTY FEE 25% of total permit fee if issued after commencement of work $ ($250.00 minimum fee) 250.00 minimum fee)
(Effective 06/02/09) TOTAL ENCROACHMENT PERMIT FEE $ Approved By Redlands Regular Meeting of 09-03-24 1910 of 1977
7+,63$*(,17(17,21$//</()7%/$1.
Redlands Regular Meeting of 09-03-24 1911 of 1977

APPENDIX G

AS-BUILT PLANS & DRAWINGS
Redlands Regular Meeting of 09-03-24 1912 of 1977

THIS PAGE INTENTIONALLY LEFT BLANK
Redlands Regular Meeting of 09-03-24 1913 of 1977
Redlands Regular Meeting of 09-03-24 1914 of 1977
Redlands Regular Meeting of 09-03-24 1915 of 1977
PC 1 & 2
Redlands Regular Meeting of 09-03-24 1916 of 1977
Redlands Regular Meeting of 09-03-24 1917 of 1977
PC 3
Redlands Regular Meeting of 09-03-24 1918 of 1977
PC 4
Redlands Regular Meeting of 09-03-24 1919 of 1977
Redlands Regular Meeting of 09-03-24 1920 of 1977
Redlands Regular Meeting of 09-03-24 1921 of 1977
Redlands Regular Meeting of 09-03-24 1922 of 1977
EX. 24"-RS
EX. 8"-PS RETURN

FROM PRIMARY

SLUDGE PUMPS TO

INLET CHANNEL
EX. 12"-RCP (PLUGGED AND

ABANDONED IN PLACE)
EX. 12"-S TO

SKIMMINGS SUMP
EX. DIVERSION
BOX NO.1
PRIMARY CLARIFIER NO. 1
PRIMARY CLARIFIER NO. 2
PRIMARY CLARIFIER NO. 3
EX. 36"-PE TO PEAK

PONDS, FOR

CONTINUATION SEE
DWG. CY-02
SCALE: 1/8" = 1'-0"
0 4' 8' 16' 24'
SCALE: 1/8"=1'-0"
1 PRIMARY CLARIFIERS PLAN 03M-01
EX. EFFLUENT

WEIR TROUGH
(TYP)
EX. EFFLUENT

CHANNEL
EX. INLET CHANNEL
(TYP OF 3)
EX. 12" SCUM
GATE (TYP OF 2)
EX. 10" GATE
(TYP OF 6)
EX. 36" SLIDE GATE
EX. COLLECTOR DRIVE

OPENINGS (TYP)
EX. 12" SKIMMING
TROUGH PRIMARY CLARIFIER NO. 4 EX. DIVERSION
BOX NO.2
EX. 27"-RS FROM HEADWORKS,

FOR CONTINUATION SEE
DWG. CY-05
EX. WEIR
36"-PE(15) TO PEAK PONDS,

FOR CONTINUATION SEE
DWG. CY-02
36" GATE-2011
D
03M-04
A
03M-02
B
03M-02
C
03M-04
36"-PI(15) FROM HEADWORKS,
FOR CONTINUATION SEE DWG.

CY-05
SCALE: 3/8"=1'-0"
1 DIVERSION BOX NO.2 ENLARGED PLAN -
EX. WEIR
EX. CHANNEL STUB OUT

W/ STOP PLATE FOR

FUTURE CLARIFIER
EX. 24"

SLIDE GATE
36"-PI(15) FROM

HEADWORKS, FOR

CONTINUATION
SEE DWG. CY-05
36" GATE-2001
EX. 27"-RS FROM

HEADWORKS, FOR

CONTINUATION
SEE DWG. CY-05
EX. 27" SLIDE GATE
EX. PRIMARY CLARIFIER
NO.4 INLET CHANNEL
EX. 24"-RS TO
DIVERSION BOX NO.1

SEE ENLARGED
PLAN - 1
BOTTOM EL 1154.69 BOTTOM EL 1157.69
BOTTOM EL. 1157.94
SCALE: 3/8" = 1'-0"
0 2' 4' 8' 1' 6'
NOTES:

1. FOR GENERAL NOTES, SEE DWG. M-01.

EX. DIVERSION
BOX NO.2

JUNCTION BOX

JUNCTION BOX

CORE DRILL
OPENING. SEE
DETAIL 1/03S-02
BOTTOM EL. 1157.94

COLLECTOR DRIVE
DRV-130

COLLECTOR DRIVE
DRV-110
EX. COLLECTOR DRIVE
DRV-140
4 M-02
Redlands Regular Meeting of 09-03-24 1923 of 1977
City Council Meeting K. 7.

DATE: 09/03/2024
TO: Honorable Mayor and City Council Members
SUBJECT: Consideration of purchasing five (5) Caterpillar emergency power generators from Quinn CAT for $907,478.62, and determination that this purchase is exempt from environmental review pursuant to Section 15061(b)(3) of the State's guidelines implementing the California Environmental Quality Act (Municipal Utilities and Engineering Director Harris)
MOTION(S):

If City Council determines the staff recommendation is appropriate, the following motion is provided:

I move that City Council determine that the purchase of five (5) Caterpillar emergency power generators is exempt from environmental review pursuant to Section 15061(b)(3) of the State's guidelines implementing the California Environmental Quality Act; and approve the purchase of five (5) Caterpillar emergency power generators from Quinn CAT for $907,478.62.

RECOMMENDATION:

Staff recommends that City Council determine the purchase of five (5) Caterpillar emergency power generators is exempt from environmental review pursuant to Section 15061(b)(3) of the State's guidelines implementing the California Environmental Quality Act, and authorize the purchase of five (5) Caterpillar emergency power generators from Quinn CAT for $907,478.62.

DISCUSSION:

In December 2021, the Municipal Utilities and Engineering Department (MUED) certified compliance with the American Water Infrastructure Act (AWIA). This legislation requires community water systems to perform a risk and resiliency assessment to evaluate water utility best practices and potential vulnerabilities to Redlands Regular Meeting of 09-03-24 1924 of 1977
malevolent acts or natural hazards that threaten the security or resiliency of a community water system. One element that was evaluated and recommended for improvement was emergency power supply systems for key booster pump station facilities. To address this recommendation, staff prepared a Request For Proposals for the design of emergency power supply systems at five (5) locations. In May 2023, City Council approved a Professional Services Agreement with Richard Brady and Associates (Brady) for this project. Brady completed the design in April 2024.

Emergency power supply equipment meeting the specifications recommended by Brady is available through Sourcewell at a significant cost-savings, and pre-purchasing this equipment will allow MUED to issue a construction and installation bid notice in FY 25/26. Sourcewell, formerly known as the National Joint Powers Alliance (NJPA), provides a national cooperative of purchasing opportunities on behalf of its government agency, education institution, tribal entity, and non-profit organization members. The City of Redlands is a Sourcewell member (member No.18877). The Sourcewell procurement system is a competitive process that meets Redlands' procurement requirements.

Caterpillar is a Sourcewell contracted supplier (Contract No. 092222-CAT) through the Sourcewell procurement network and offers emergency power equipment that meets the design criteria specified by Brady. Purchasing this emergency power equipment through Sourcewell will save the Water Fund approximately $423,929.90.

This purchase is exempt from environmental review pursuant to Section 15061(b)(3) of the State's guidelines implementing the California Environmental Quality Act, since it can be seen with certainty that there is no possibility that it will have a significant effect on the environment.

ALTERNATIVES:

City Council may deny the staff recommendation and provide alternate direction.

STRATEGIC PLAN:

N/A
SUBMITTED BY:

John R. Harris, Municipal Utilities and Engineering Director RECOMMENDED BY:

Charles M. Duggan Jr., City Manager
Redlands Regular Meeting of 09-03-24 1925 of 1977
REVIEWED BY:

Yvette M. Abich Garcia, City Attorney
Janice McConnell, Assistant City Manager
Danielle Garcia, Management Services/Finance Director
Dana Abramovitz-Daniel, Procurement Manager
PREPARED BY:

Paul Mariscal, Water Utility Manager
Fiscal Impact
Fiscal Year: FY 24/25
Revenue Generating: N
Appropriation Required Y/N: N
Amount: $907,479
Budgeted Y/N: Y
Account No.: 501900
Discussion:

There is no fiscal impact associated with this action. The FY 24/25 MUED Budget includes funding for this purchase.

Attachments
Quinn CAT Quote
Caterpillar Contract No. 092222-CAT
Caterpillar Contract Pricing
Redlands Regular Meeting of 09-03-24 1926 of 1977
QUOTATION NO. 240171 WELL REV 3
3500 Shepherd Street, City of Industry, California 90601 Box 226789, Los Angeles, California 90022-0744
(562) 463-6000 Fax: (562) 463-7156 Date: June 20, 2024 Page: 1 of 6 To: Contact: Terms: Net 30, see T&C’s
Company: F.O.B. Jobsite, unloading by others
Address: Sales Rep.: Art Jimenez
City, Zip: Contact #: 951-250-5104
Phone: Email: Email: [email protected]
Project Name: City of Redlands – Texas St. BS – Country Club PS – Fifth Ave PS- Agate PS Qty: Description List Price Discount Price
$ 219,294.00 $ 138,155.22
X 2
$ 276,310.44
$ 15,925.00 $ 31,850.00
1 Texas BS
Caterpillar, Model C15, EPA Tier 3, Stationary Emergency Generator Set.

Rated 400kW Standby Power, with fan, 60Hz, 3 Phase 277/480V Configuration at 1800 RPM.

Sourcewell Product Discount is 37% (- $ 81,138.78 ) off List Price (Per Genset) CAT Non-Sourcewell / Dealer Net Items:

Inbound/ Outbound Freight (Freight to Redlands CA)
Startup – NFPA 110 Testing (1 Days/ 8Hrs)
Fifth Ave PS
Caterpillar, Model C15, EPA Tier 3, Stationary Emergency Generator Set.

Rated 500kW Standby Power, with fan, 60Hz, 3 Phase 277/480V Configuration at 1800 RPM.

Country Club PS
Caterpillar, Model C15, EPA Tier 3, Stationary Emergency Generator Set.

Rated 500kW Standby Power, with fan, 60Hz, 3 Phase 277/480V Configuration at 1800 RPM.

Sourcewell Product Discount is 37% (- $ 82,838.56) off Generator List Price (Per Genset) CAT Non-Sourcewell / Dealer Net Items:

Inbound/ Outbound Freight (Freight to Redlands CA)
Startup – NFPA 110 Testing (1 Days/ 8Hrs)
Agate Ave PS
Caterpillar, Model C18, EPA Tier , Stationary Emergency Generator Set.

Rated 650kW Standby Power, with fan, 60Hz, 3 Phase 277/480V Configuration at 1800 RPM.

Sourcewell Product Discount is 33% (- $ 95,975.22) off Generator List Price.

CAT Non-Sourcewell / Dealer Net Items:

Inbound/ Outbound Freight (Freight to Redlands CA)
Startup – NFPA 110 Testing (1 Days/ 8Hrs)






$ 223,888.00 $ 141,049.44
$ 223,888.00 $ 141,049.44
$ 15,925.00 $ 31,850.00
$ 17,495.00 $ 17,495.00
$ 290,834.00 $ 194,858.78
Redlands Regular Meeting of 09-03-24 1927 of 1977
QUOTATION NO. 240171 WELL REV 3
3500 Shepherd Street, City of Industry, California 90601 Box 226789, Los Angeles, California 90022-0744
(562) 463-6000 Fax: (562) 463-7156 Date: June 20, 2024 Page: 2 of 6 C15 DPF (Price Adder) Integrated/ Ship Loose = $46,250.00 (Per Genset/ IF REQUIRED) C18 DPF (Price Adder) Integrated/ Ship Loose = 53,750.00 (Per Genset/ IF REQUIRED) “Buyer has to put "Sourcewell Contract #120617-Cat" on the Purchase Order” Includes standard features as listed in product data sheet and additional accessories as listed herein…
SALES TAX NOT INCLUDED. Buyer responsible for all taxes including any applicable tire fees. The quotation provided herein is for information only, and is not a valid offer to sell unless signed by an officer of Quinn Power Systems in the space provided below. Any offer to sell or any offer accepted shall be subject to the Terms and Conditions page. Unless expressly stated on the face of this quotation, all prices, delivery schedules and product specifications are subject to change without notice. Quotation is good for 30 days from quote date above, expires after that duration.

Total Price
(SALES TAX
INCLUDED):

PRODUCT DESCRIPTION
Generator & Accessories:

D400KW Caterpillar Diesel Standby Generator (Model C15) Tier 3 Emissions
UL2200 Listed Package Genset
IBC Certified
Sound Attenuated Weather Enclosure (Color: White/ 73dBA at 23ft, 100% load) Integral Fuel Tank – 330 Gallons (12hrs supply @ 100% load) Fuel Tank Fill Pipe & Lock Cap
GCCP 1.5 Control Panel (Suitable for use in a multi-generator load-share system) Panel Mounted Audible Alarm
Expansion I/O Modules (Ship Loose)
Fuel Level Alarms
Low Coolant Temp Alarm
Low Coolant Level Shutdown
Electronic Governor
Integrated Voltage Regulator
PMG Excitation
Circuit Breaker – 800A
Battery and Cables
Battery Charger
Coolant Heater
Standard Air Cleaner
Standard Radiator
Operations & Maintenance Manuals (1 Copy)
Startup/ Commissioning Service – NFPA 110 Testing
Includes Freight to Jobsite (Offload by others)
5Yr Standby Warranty (500hrs/ year max operation)
1YR CVA – Customer Value Agreement
Generator & Accessories:

D500KW Caterpillar Diesel Standby Generator (Model C15) Tier 3 Emissions Cert
UL2200 Listed Package Genset
IBC Certified
Sound Attenuated Weather Enclosure (Color: White/ 75dBA at 23ft, 100% load) Integral Fuel Tank – 330 Gallons (9hrs supply @ 100% load) Fuel Tank Fill Pipe & Lock Cap
GCCP 1.2 Control Panel
$ 907,478.62
Sales Tax @ 8.75% $ 73,015.52
Redlands Regular Meeting of 09-03-24 1928 of 1977
QUOTATION NO. 240171 WELL REV 3
3500 Shepherd Street, City of Industry, California 90601 Box 226789, Los Angeles, California 90022-0744
(562) 463-6000 Fax: (562) 463-7156 Date: June 20, 2024 Page: 3 of 6 Panel Mounted Audible Alarm
Expansion I/O Modules (Ship Loose)
Fuel Level Alarms
Low Coolant Temp Alarm
Low Coolant Level Shutdown
Electronic Governor
Integrated Voltage Regulator
PMG Excitation
Circuit Breaker – 800A
Battery and Cables
Battery Charger
Coolant Heater
Standard Air Cleaner
Standard Radiator
Operations & Maintenance Manuals (1 Copy)
Startup/ Commissioning Service – NFPA110
Includes Freight to Jobsite (Offload by others)
5Yr Standby Warranty (500hrs/ year max operation)
1YR CVA – Customer Value Agreement
Generator & Accessories:

D650KW Caterpillar Diesel Standby Generator (Model C18) Tier 2 Emissions Cert
UL2200 Listed Package Genset
IBC Certified
Sound Attenuated Weather Enclosure (Color: White/ 75dBA at 23ft, 100% load) Integral Fuel Tank – 660 Gallons (11hrs supply @ 100% load) Fuel Tank Fill Pipe & Lock Cap
GCCP 1.2 Control Panel
Panel Mounted Audible Alarm
Expansion I/O Modules (Ship Loose)
Fuel Level Alarms
Low Coolant Temp Alarm
Low Coolant Level Shutdown
Electronic Governor
Integrated Voltage Regulator
PMG Excitation
Circuit Breaker – 1200A
Battery and Cables
Battery Charger
Coolant Heater
Standard Air Cleaner
Standard Radiator
Operations & Maintenance Manuals (1 Copy)
Startup/ Commissioning Service – NFPA110
Includes Freight to Jobsite (Offload by others)
5Yr Standby Warranty (500hrs/ year max operation)
1YR CVA – Customer Value Agreement
Specifications
This quote is based on our understanding of your written specifications listed below:

Specification Section: 166622 Standby Diesel Electric Generators For Purchase by the City of Redlands (Owner), Single Line Diagram E 5.01 Clarifications
Quinn Power Systems is quoting a standard engineered product that complies with the functional intent of your verbal specification.

Quinn Power Systems and Caterpillar will make every effort to meet the project delivery schedule requirements. However, do to the ongoing global supply chain disruptions, Quinn Power Systems will not be liable or accept any liquidated damage clause on a purchase order.

Redlands Regular Meeting of 09-03-24 1929 of 1977
QUOTATION NO. 240171 WELL REV 3
3500 Shepherd Street, City of Industry, California 90601 Box 226789, Los Angeles, California 90022-0744
(562) 463-6000 Fax: (562) 463-7156 Date: June 20, 2024 Page: 4 of 6 Included in this quote is one (1), one day/ 8hrs (max) startup/ commissioning, (NFPA110). Additional technician trips to the jobsite due to insufficient site readiness will result in additional cost, at a billable rate of $1200 per day. A change order will be required prior to the scheduling of additional technician site visits.

Accessories and/or modifications
Initial fill of coolant and lube oil
(1 set) Operation & Maintenance manuals (electronic copy) * (additional sets, at additional cost) Factory standard warranty - 5 years from startup service
QPS field work
Delivery to jobsite (offload/crane service by others)
Not included
Sales tax
Air, building or construct permits
Offloading/crane service of equipment off delivery truck Diesel fuel, initial fill or for testing
Availability:

Submittals: Estimated (8 - 10 Weeks) on receipt and approval of purchase order. (1 electronic copy) Equipment: Estimated (35+ Weeks) for factory build time after submittal approval.

Modifications: Estimated (Additional time TBD) additional time will vary depending on 3rd party or Quinn shop schedule and scope of work. Not included: Unforeseen factory delays, transit time from factory or vendor and/or delays due to project site readiness. ** Equipment prices and lead times are subject to change without notice.**

EMISSIONS NOTE
¾ "California Air Resources Board (CARB) has approved alignment with the federal New Source Performance Standards (NSPS). Such alignment allows for emergency standby engines to be exempt from Tier 4 emissions standards; however, local air districts can require more stringent emissions control. The prospective buyer of the equipment quoted above is hereby notified the NSPS exemption does not apply to non-emergency standby engines (e.g. prime power applications such as peak shaving, parallel operation with the grid, or storm avoidance), or portable engines, even if used for emergency standby. Consult the local air district for permitting requirements and required emissions controls. Presently, South Coast Air Quality Management District (SCAQMD) Rule 1470 requires the use of a particulate filter if an engine is located within 100 meters of a school, and may require either a diesel particulate filter or an oxidation catalyst, depending upon engine size, if the installation is within 50 meters of a sensitive receptor. Particulate filters may also be required for Title V and major polluting facilities. For emissions requirements specific to the project for which this engine is being quoted, please contact SCAQMD at 909-396-2000. Unless otherwise listed above a DPF is not included in this proposal, please call for quotation if a DPF is required for this project.” ¾ Caterpillar engines require a minimum of 30% load to prevent engine damage due to wet-stacking. Depending upon the permit and site specific conditions, SCAQMD emergency engine permits will only allow between 20 and 50 hours of runtime per year for non-emergency applications such as testing and exercising. Passive Diesel Particulate Filter systems depend on generator loading of a minimum of 50-60% to achieve minimum exhaust temperature threshold to keep soot regeneration and the filter backpressure within acceptable levels. If the engine will be operated consistently at low loads/low exhaust temperatures, the customer should make provisions to add load via facility operations or a load bank. Active Diesel Particulate Filter systems require no external load in order to regenerate. If listed above, Passive DPF option pricing, does not include a load bank or a load bank circuit breaker. If a load bank is needed for this project, please call for quotation.

TERMS AND CONDITIONS

1. Acceptance of Order.

This Quotation is for Buyer's information only and is not a valid offer to sell unless signed by an authorized representative of Seller in the place provided on the face of this Quotation. Prices, terms and conditions in an order from Buyer, which are inconsistent with the prices, terms and conditions of this Quotation, will be rejected by Seller, and are of no force and effect unless accepted in writing by Seller. Prices, delivery schedules and the scope of work on this Quotation are subject to change at Seller’s discretion.

2. Liability.

Seller's liability on any claim of any kind, including claims for negligence, or for any loss or damage arising out of or connected with the manufacture, sale, delivery, installation, resale or use of any products covered by or furnished under any order connected with this Quotation shall be limited to those claims arising solely from the acts of Seller and Seller shall in no way be liable for any special, indirect, incidental or consequential damages. The term “consequential damages” shall include, but not be limited to, loss of anticipated profits, business interruption, loss of use, revenue, reputation and data, costs incurred, including without limitation, for capital, fuel, power and loss or damage to property or equipment. Buyer expressly acknowledges and agrees that Seller has set its prices in reliance upon the limitations of liability and other terms and conditions specified herein, which allocate the risk between Seller and Buyer and form a basis of this bargain between the parties. Any claims against Seller for shortages in shipments shall be made in writing to Seller within fifteen (15) days of receipt of shipment by Buyer. Unless otherwise provided for in writing, Seller's responsibility for shipment ceases upon delivery to carrier, and any claims for shortage, delays or damage occurring thereafter shall be made direct to carrier by Buyer. Seller shall not be liable for any delays in delivery attributable to strikes, labor disputes, lockouts, accidents, fires, delays in manufacture or in transportation, delays in delivery of component materials, floods, severe weather, or Acts of God, embargoes, governmental actions, or any other cause beyond the reasonable control of Seller. Seller shall not indemnify nor be liable to Buyer, Buyer’s assigns, successors, purchasers, lessees or licensees, or to any person or entity for any claims, losses, expenses or judgments arising out of or resulting in any way from the product or integration of compatibility of the product with any other components, processes, facilities or equipment that does not comply with the equipment manufacturer(s)’s recommendations.

3. Shipments.

Unless otherwise specified, all risk of loss from the goods shall shift to Buyer at such time as the goods are delivered to a carrier for shipment to Buyer. Unless otherwise specified, shipment dates are approximate and all quoted prices exclude shipping costs. Shipment of goods under any order accepted by Seller shall be subject to the approval by Seller of Buyer’s financial condition at the time of shipment.

Whether or not terms of payment are specified elsewhere, Seller may, at its option, condition shipments under any order accepted by Seller upon receipt of satisfactory security or of cash prior to shipment. If, at Buyer’s request, shipment of goods under any order accepted by Seller is delayed more than thirty (30) days after the shipment date specified in the order, or the date the goods are ready for shipment, whichever is later, Seller will require immediate payment in full and/or assess additional charges for the expenses incident to such delay.

4. Termination.

Redlands Regular Meeting of 09-03-24 1930 of 1977
QUOTATION NO. 240171 WELL REV 3
3500 Shepherd Street, City of Industry, California 90601 Box 226789, Los Angeles, California 90022-0744
(562) 463-6000 Fax: (562) 463-7156 Date: June 20, 2024 Page: 5 of 6 In the absence of a written agreement between Buyer and Seller expressing different terms and conditions as to termination, any order accepted by Seller may be terminated prior to completion by Buyer only upon written notice to Seller and payment of Seller’s termination charges. If notice of termination is received by Seller after Seller has committed to buy the principal components for any order, termination charges shall include all direct and indirect costs incurred by Seller and the total profit anticipated by Seller. Additionally, Buyer’s instruction to Seller to stop work for thirty (30) days during the time specified for performance in any order may be construed by Seller as the equivalent of written notice of termination from Buyer and previous stipulations will be in effect.

5. Taxes.

Unless expressly stated, Seller's prices do not include sales, use, excise or similar taxes, which Seller may be required to pay in filling Buyer's order. The amount of any applicable tax shall be paid by Buyer as an additional charge unless specifically included in any order accepted by Seller, or in lieu thereof, Buyer shall provide Seller with a tax exemption certificate acceptable to the taxing authorities.

6. Patents.

Seller shall, at its own expense, defend and save Buyer harmless from the expenses and consequences of any suit or procedure brought against Buyer, based on a claim that the use or sale of goods specified in any order accepted by Seller constitutes an infringement of any United States letters of patent in existence on the date of any such order; provided Buyer promptly notifies Seller in writing of such claim and gives the necessary authorization, information and assistance for the defense of such a claim.

7. Changes.

Seller, and Seller's suppliers, may, at any time, without notice to Buyer, make changes (whether in design, materials, the addition of improvements, or otherwise) in any goods specified in any order accepted by Seller without incurring any obligation of any kind as a result thereof, but only to the extent that such change does not cause the goods specified to fail to meet Buyer's requirements. Buyer may, in its order, provide for changes in its requirements with provision for a corresponding equitable change in the price, if any; but in no instance shall Buyer make changes, which are substantially different from the scope of the original order accepted by Seller.

8. Export Sales.

In the event the goods and services specified in any order accepted by Seller are for export, the Buyer shall be responsible for securing export, import and other licenses or authorizations as may be required.

The conditions specified in this Section apply to all export transactions. This transaction is only for the sale of the equipment requested and detailed in this Quotation. Not included is any startup assistance, fieldtesting, training or any other services that might be required on site. Also not included is any installation, installation audits, sea trials (if applicable), or installation materials. To ensure proper application, installation, and warranty integrity, Buyer is encouraged to contact the applicable Caterpillar Dealer for these services. The costs of these services are not included in the sale price nor will Seller be responsible for any such related costs.

9. Permits for Equipment Design, Installation and Operation.

As a supplier of equipment, disclaims responsibility for any and all permits or licenses necessary to design, install and operate the equipment due to zoning, air quality, environmental, safety, building or construction codes or use permits pertaining to Buyer’s particular application of such equipment or any similar type of permit. Special attention should be given to the requirements of local air district rules and California Air Resources Board (CARB) regulations pertaining to permit requirements. Seller is quoting on equipment based on the specifications set forth in this Quotation. If additional equipment or engine modifications are required beyond the specifications, such as additional equipment required for compliance by a local air district or CARB, those items are not included and are the responsibility of Buyer. For example, South Coast AQMD (SCAQMD) Rule 1470 may require controls and limits on particulate matter, especially when the engine installation is within 100-meters from a school, or within 50 meters of a sensitive receptor (defined in Rule 1470). Ultra low sulfur fuel is required for particulate filters. CARB Diesel Fuel, or other CARB-approved alternative fuel, is also required for compression ignition (CI) engines operated in California. When indicated in the bill of materials, the proposed equipment may be SCAQMD pre-approved as Certified Equipment. This certification does not eliminate the permit process or responsibility of others to obtain a permit. Procurement of certified equipment assures permitability, reduces the permit processing fees and reduces the time necessary to obtain the permit through SCAQMD.

10. Start-up, Commissioning and Operating Requirements.

Equipment provided in this Quotation may require start-up and commissioning, including inspection(s), to ensure the equipment is installed in accordance with manufacturer(s)’s recommendations and specifications. If Seller has commissioned the equipment, Buyer agrees not to modify the design or components of the installation such that the modifications would violate any legal requirements of the installation, or would cause the installation to deviate from manufacturer(s)’s recommendations and specifications. Buyer acknowledges and agrees that, with respect to products sold to Buyer in connection with this Quotation, Buyer shall have the sole responsibility to ensure the products are properly installed, operated and maintained in accordance with the manufacturer(s)’s recommendations and specifications, and to determine and comply with all applicable Federal, state, local and regulated use restrictions and requirements, including, without limitation, the continuing responsibility to ensure that the use of product is in full compliance with all applicable environmental laws and regulations. Failure to install, operate and maintain the products in accordance with the manufacturer(s)’s recommendations and specifications will invalidate any applicable manufacturer’s warranty.

11. Additional material.

Only those items listed in this Quotation are included with any order. For example, unless specifically identified in this Quotation, the following items are not included with any purchased equipment: any exhaust or fuel piping, main fuel tank, fuel, duct work, special tools, insulation, wiring, cable, bus duct, concrete, anchor bolts, rigging or any material or labor incidental to the installation itself. Buyer specifically assumes responsibility for the provision of any such items if not specifically identified in the Quotation.

12. Hours of services.

When included, delivery, startup assistance, field testing, training or any other services required on site will be provided during the normal weekday working hours of 7:00 am to 4:30 pm. Delivery or services occurring at any other time, weekends or holidays is subject to premium charges.

13. Warranty.

The equipment manufacturer's warranty is the only warranty provided in connection with the equipment described in this Quotation. Buyer is responsible for operating and maintaining the equipment as specified by the manufacturer. The manufacturer’s warranties are exclusive and in lieu of all other warranties either oral or written, express or implied, including but not limited to any warranty of merchantability or fitness for a particular purpose. Seller is not a manufacturer and makes no warranty and shall not, under any circumstances, be liable for any indirect or special, incidental or consequential damages including but not limited to loss of production, loss of profit, loss of use or business interruption, or any other economic loss, whether arising from contract, tort, strict liability or any other theory of law. Buyer, Buyer’s assigns, successors, purchasers or any other person designated to operate the equipment as the end user, is responsible for operating the equipment in accordance with manufacturer(s)’s recommendations and specifications. Failure to perform all scheduled maintenance may result in damage to the equipment, and may be grounds to deny warranty coverage.

14. Terms.

Terms of payment are due upon receipt of invoice with no deductions of any kind for retentions, setoffs, discounts or other similar items. A finance charge of 1.5% per month (not to exceed the maximum allowed by law) will be charged on all past due invoices. When necessary Seller will file a California “Preliminary 20-day notice” pursuant to Section 3097 of the California Civil Code.

15. Cost additives.

A: Unit Cost.

Quotation prices are valid for 30 days only and are based on current market prices as of date of quotation. The Seller reserves the right to adjust the final invoice with a price escalation up to 6% due to 1) purchase orders being received after expiration of quotation, 2) fluctuations in raw materials market prices at time of order, 3) labor rate increases at time of scheduled field services, 4) delays in submittal approvals and/or release of equipment or 5) additional items or services provided that were not included as part of the original quotation. Since final invoicing can and may take place up to a year or more from original quotation date.

B: Delays.

If delivery is delayed by customer Buyer beyond original shipment date, purchase price is due 30 days after original shipment date and a storage and handling charge will be applied and is due each month until delivery. Finance charge of 1.5% per month (not to exceed the maximum allowed by law) is applicable on any amounts arising hereunder or in connection herewith that are not paid when due.

C: Start up.

If construction of the facility or other delays are experienced or expected, which prohibit the initial startup of the equipment beyond one year from delivery additional costs may be imposed including, but not be limited to, long term storage preparation, inspection charges, parts, service, etc.

16. Lead Times.

Lead times are based on manufactures estimated timetables. Project completion time may vary due to delays in receipt of purchase orders, submittal approval, release of equipment, manufactures unforeseen delays in production or holiday schedules. Project completion time frame cannot be guaranteed. Back orders will be processed as soon as available. Part number changes may be made to provide latest improved interchangeable items of equipment.

17. Governing Law and Venue.

The rights and obligations of the parties with respect to the transactions contemplated by this Quotation shall be governed in all respects by the laws of the State of California. The parties hereto irrevocably agree that the exclusive venue for any litigation arising in connection with the transactions specified in this Quotation shall be in the courts located in the County of Los Angeles, California.

18. Attorneys’ Fees and Costs.

In the event of any legal action, controversy, claim, or dispute between the parties involving the transactions contemplated by this Quotation, the prevailing party shall be entitled to recover from the other party reasonable expenses, attorneys’ fees, and costs.

19. Additional Conditions.

Redlands Regular Meeting of 09-03-24 1931 of 1977
QUOTATION NO. 240171 WELL REV 3
3500 Shepherd Street, City of Industry, California 90601 Box 226789, Los Angeles, California 90022-0744
(562) 463-6000 Fax: (562) 463-7156 Date: June 20, 2024 Page: 6 of 6 Buyer shall furnish to Seller, at no cost, suitable working space, storage space, adequate heat, telephone, light, ventilation, regulated electric power and outlets for testing purposes (if applicable). The facilities shall be within a reasonable distance from where any applicable services are to be provided. Seller and its representatives shall have full and free access to the equipment in order to provide any applicable services. Buyer shall provide the means to shut-off and secure electric power to the equipment and provide safe working conditions. Buyer shall not require Seller or its employees, as a condition to site access or otherwise, to further agree or enter into any agreement, which waives, releases, indemnifies or otherwise limits or expands any rights or obligation whatsoever. Any such agreements shall be null and void. Seller is under no obligation to remove or dispose of parts or equipment unless specifically agreed upon in Seller’s scope of work. Seller-removed parts become the property of Seller. Seller must not perform any electrical power switching unless specifically requested by Buyer, under the supervision of Buyer, and subject to procedures jointly agreed to in advance. Notwithstanding Buyer’s request, Seller may refuse to perform power switching, if in the opinion of Seller, such action would be unsafe. IN THE EVENT THAT SELLER PERFORMS POWER SWITCHING, TO THE FULLEST EXTENT PERMITTED BY LAW, BUYER SHALL INDEMNIFY, DEFEND, AND HOLD SELLER HARMLESS FROM ANY AND ALL LIABILITY, ACTIONS, SUITS, CLAIMS, DEMANDS, DAMAGES, COSTS, AND EXPENSES (“LOSSES”) ARISING OUT OF OR IN ANY WAY CONNECTED WITH OR RESULTING FROM SELLER’S PERFORMANCE OF POWER SWITCHING, REGARDLESS OF WHETHER THE LOSSES RESULT FROM SELLER’S NEGLIGENCE (WHETHER ACTION OR PASSIVE, AND WHETHER SOLE, JOINT, OR CONCURRENT), AND EVEN THOUGH CAUSED IN WHOLE OR IN PART BY A PRE-EXISTING DEFECT, STRICT LIABILITY, OR OTHER LEGAL FAULT OF SELLER. THIS INDEMNITY SHALL APPLY TO ANY ACTS OR OMISSIONS OR NEGLIGENT CONDUCT, WHETHER ACTIVE OR PASSIVE, ON THE PART OF EITHER SELLER OR BUYER. If OSHA or any other federal, state or local government, trade association, or contractual regulations or standards require a “safety person” to be on site during the performance of services, or in the event of a trade union jurisdictional dispute where trade union represented personnel are required to assist or stand by during the performance of services by Seller, Buyer shall be responsible for providing for and paying for any charge or wages for such person(s), as applicable. Buyer shall immediately inform Seller, in writing, at the time of order placement and thereafter, of any unsafe or hazardous substance or condition at the site, including, but not limited to, the presence of asbestos or asbestos-containing materials, and shall provide Seller with any applicable Material Data Safety Sheets regarding the same. Any losses, costs, damages, claims and expenses incurred by Seller as a result of Buyer’s failure to advise Seller shall be borne by Buyer. Seller, in its sole discretion and without cost or penalty, reserves the right to cancel its performance under this Agreement or any order immediately upon written notice to Buyer following Seller's discovery of unsafe or hazardous site substance or condition or any other circumstance altering Seller performance of Services. Buyer shall appoint a representative familiar with the site and the nature of the Services to be performed by Seller to be accessible at all times that Seller personnel are at the site. Seller shall not be liable for any expenses incurred by Buyer in removing, replacing or refurbishing any Buyer equipment or any part of Buyer’s building structure that restricts Seller's access. Buyer's personnel shall cooperate with and provide all necessary assistance to Seller. Seller shall not be liable or responsible for any work performed by Buyer.

ACCEPTED BY:

By: ________________________________
Company: __________________________
Date: ____________________
P.O. #: ____________________________
SUBMITTED BY:

By: Art Jimenez
Quinn Power Systems
Phone: 951-250-5104

Redlands Regular Meeting of 09-03-24 1932 of 1977

Caterpillar, Inc.

Electrical Energy Pow er G eneration Equipm ent
#092222-CAT
TH IS D O CU M EN T IS FO R IN FO RM ATIO N AL PU RPO SES O N LY AN D IS N O T A PART O F TH E CO N TRACT BETW EEN SO U RCEW ELL AN D SU PPLIER.

If you w ould like to purchase off this contract or for questions regarding products and pricing, the Supplier C ontact Inform ation can be found at:

C aterpillar Inc.: C ontract 092222-C AT | Sourcew ell (sourcew ell-m n.gov) Redlands Regular Meeting of 09-03-24 1933 of 1977
092222-CAT
Rev. 3/2022 1
Solicitation N um ber: RFP #092222

CO N TRACT
This C ontract is betw een Sourcew ell, 202 12th Street N ortheast, P.O. Box 219, Staples, MN 56479 (Sourcew ell) and C aterpillar Inc., 5212 N . O’C onnor Blvd., Suite 1100, Irving, TX 75039 (Supplier).

Sourcew ell is a State of M innesota local governm ent unit and service cooperative created under the law s of the State of M innesota (M innesota Statutes Section 123A.21) that offers cooperative procurem ent solutions to governm ent entities. Participation is open to eligible federal, state/province, and m unicipal governm ental entities, higher education, K-12 education, nonprofit, tribal governm ent, and other public entities located in the U nited States and C anada.

Sourcew ell issued a public solicitation for Electrical Energy Pow er Generation Equipm ent w ith Related Parts, Supplies, and Services from w hich Supplier w as aw arded a contract.

Supplier desires to contract w ith Sourcew ell to provide equipm ent, products, or services to Sourcew ell and the entities that access Sourcew ell’s cooperative purchasing contracts (Participating Entities).

1. TERM O F CO N TRACT
A. EFFEC TIVE DATE. This C ontract is effective upon the date of the final signature below .

B. EXPIRATION DATE AN D EXTEN SION . This C ontract expires N ovem ber 22, 2026, unless it is cancelled sooner pursuant to Article 22. This C ontract m ay be extended one additional year upon the request of Sourcew ell and w ritten agreem ent by Supplier.

C. SU RVIVAL OF TERM S. Notw ithstanding any expiration or term ination of this C ontract, all paym ent obligations incurred prior to expiration or term ination w ill survive, as w ill the follow ing: Articles 11 through 14 survive the expiration or cancellation of this C ontract. All other rights w ill cease upon expiration or term ination of this C ontract.

2. EQ U IPM EN T, PRO D U CTS, O R SERVICES
A. EQ U IPM EN T, PRODU C TS, OR SERVIC ES. Supplier w ill provide the Equipm ent, Products, or Services as stated in its Proposal subm itted under the Solicitation N um ber listed above. 




  



Redlands Regular Meeting of 09-03-24 1934 of 1977
092222-CAT
Rev. 3/2022 2
Supplier’s Equipm ent, Products, or Services Proposal (Proposal) is attached and incorporated into this C ontract.

All Equipm ent and Products provided under this C ontract m ust be new and the current m odel.

Supplier m ay offer used, close-out or refurbished Equipm ent or Products if they are clearly indicated in Supplier’s product and pricing list. U nless agreed to by the Participating Entities in advance, Equipm ent or Products m ust be delivered as operational to the Participating Entity’s site.

This C ontract offers an indefinite quantity of sales, and w hile substantial volum e is anticipated, sales and sales volum e are not guaranteed.

B. W ARRAN TY. Supplier w arrants that all Equipm ent, Products, and Servicesfurnished are free from liens and encum brances, and are free from defects in design, m aterials, and w orkm anship.

In addition, Supplier w arrants the Equipm ent, Products, and Services are suitable for and w ill perform in accordance w ith the ordinary use for w hich they are intended. Supplier’s dealers and distributors m ust agree to assist the Participating Entity in reaching a resolution in any dispute over w arranty term s w ith the m anufacturer. Any m anufacturer’s w arranty that extends beyond the expiration of the Supplier’s w arranty w ill be passed on to the Participating Entity.

C. DEALERS, DISTRIBU TORS, AN D/OR RESELLERS. U pon C ontract execution and throughout the C ontract term , Supplier m ust provide to Sourcew ell a current m eans to validate or authenticate Supplier’s authorized dealers, distributors, or resellers relative to the Equipm ent, Products, and Services offered under this C ontract, w hich w ill be incorporated into this C ontract by reference. It is the Supplier’s responsibility to ensure Sourcew ell receives the m ost current inform ation.

3. PRICIN G
All Equipm ent, Products, or Services under this C ontract w ill be priced at or below the price stated in Supplier’s Proposal.

W hen providing pricing quotes to Participating Entities, all pricing quoted m ust reflect a Participating Entity’s total cost of acquisition. This m eans that the quoted cost is for delivered Equipm ent, Products, and Services that are operational for their intended purpose, and includes all costs to the Participating Entity’s requested delivery location.

Regardless of the paym ent m ethod chosen by the Participating Entity, the total cost associated with any purchase option of the Equipm ent, Products, or Services m ust alw ays be disclosed in the pricing quote to the applicable Participating Entity at the tim e of purchase.

A. SHIPPIN G AN D SHIPPIN G C OSTS. All delivered Equipm ent and Products m ust be properly packaged. Dam aged Equipm ent and Products m ay be rejected. If the dam age is not readily 




  



Redlands Regular Meeting of 09-03-24 1935 of 1977
092222-CAT
Rev. 3/2022 3
apparent at the tim e of delivery, Supplier m ust perm it the Equipm ent and Products to be returned w ithin a reasonable tim e at no cost to Sourcew ell or its Participating Entities.

Participating Entities reserve the right to inspect the Equipm ent and Products at a reasonable tim e after delivery w here circum stances or conditions prevent effective inspection of the Equipm ent and Products at the tim e of delivery. In the event of the delivery of nonconform ing Equipm ent and Products, the Participating Entity w ill notify the Supplier as soon as possible and the Supplier w ill replace nonconform ing Equipm ent and Products w ith conform ing Equipm ent and Products that are acceptable to the Participating Entity.

Supplier m ust arrange for and pay for the return shipm ent on Equipm ent and Products that arrive in a defective or inoperable condition.

Sourcew ell m ay declare the Supplier in breach of this C ontract if the Supplier intentionally delivers substandard or inferior Equipm ent or Products.

B. SALES TAX. Each Participating Entity is responsible for supplying the Supplier w ith valid taxexem ption certification(s). W hen ordering, a Participating Entity m ust indicate if it is a taxexem pt entity.

C. HOT LIST PRIC IN G. At any tim e during this C ontract, Supplier m ay offer a specific selection of Equipm ent, Products, or Services at discounts greater than those listed in the C ontract.

W hen Supplier determ ines it w ill offer Hot List Pricing, it m ust be subm itted electronically to Sourcew ell in a line-item form at. Equipm ent, Products, or Services m ay be added or rem oved from the Hot List at any tim e through a Sourcew ell Price and Product C hange Form as defined in Article 4 below .

Hot List program and pricing m ay also be used to discount and liquidate close-out and discontinued Equipm ent and Products as long as those close-out and discontinued item s are clearly identified as such. C urrent ordering process and adm inistrative fees apply. Hot List Pricing m ust be published and m ade available to all Participating Entities.

4. PRO D U CT AN D PRICIN G CH AN G E REQ U ESTS
Supplier m ay request Equipm ent, Product, or Service changes, additions, or deletions at any tim e. All requests m ust be m ade in w riting by subm itting a signed Sourcew ell Price and Product C hange Request Form to the assigned Sourcew ell Supplier Developm ent Adm inistrator. This approved form is available from the assigned Sourcew ell Supplier Developm ent Adm inistrator.

At a m inim um , the request m ust:
x Identify the applicable Sourcew ell contract num ber; x Clearly specify the requested change;
x Provide sufficient detail to justify the requested change; 




  



Redlands Regular Meeting of 09-03-24 1936 of 1977
092222-CAT
Rev. 3/2022 4
x Individually list all Equipm ent, Products, or Services affected by the requested change, along w ith the requested change (e.g., addition, deletion, price change); and x Include a com plete restatem ent of pricing docum entation in M icrosoft Excel with the effective date of the m odified pricing, or product addition or deletion. The new pricing restatem ent m ust include all Equipm ent, Products, and Services offered, even for those item s w here pricing rem ains unchanged.

A fully executed Sourcew ell Price and Product Request Form w ill becom e an am endm ent to this C ontract and w ill be incorporated by reference.

5. PARTICIPATIO N , CO N TRACT ACCESS, AN D PARTICIPATIN G EN TITY REQ U IREM EN TS

A. PARTIC IPATION . Sourcew ell’s cooperative contracts are available and open to public and nonprofit entities across the U nited States and C anada; such as federal, state/province, m unicipal, K-12 and higher education, tribal governm ent, and other public entities. Supplier m ay not enter into a contract w ith a U .S. Federal Governm ent entity prior to obtaining necessary internal approvals and w ill not be obligated to provide Equipm ent, Products, or Services to any U .S. Federal Governm ent entity under this C ontract unless separately agreed in w riting. Supplier m ay w ork w ith such parties and m ay agree to provide equipm ent or services under the C ontract on a case-by-case basis.

The benefits of this C ontract should be available to all Participating Entities that can legally access the Equipm ent, Products, or Services under this C ontract. A Participating Entity’s authority to access this C ontract is determ ined through its cooperative purchasing, interlocal, or joint pow ers law s. Any entity accessing benefits of this C ontract w ill be considered a Service M em ber of Sourcew ell during such tim e of access. Supplier understands that a Participating Entity’s use of this C ontract is at the Participating Entity’s sole convenience and Participating Entities reserve the right to obtain like Equipm ent, Products, or Services from any other source.

Supplier is responsible for fam iliarizing its sales and service forces w ith Sourcew ell contract use eligibility requirem ents and docum entation and w ill encourage potential participating entities to join Sourcew ell. Sourcew ell reserves the right to add and rem ove Participating Entities to its roster during the term of this C ontract.

B. PU BLIC FAC ILITIES. Supplier’s em ployees m ay be required to perform w ork at governm entow ned facilities, including schools. Supplier’s em ployees and agents m ust conduct them selves in a professional m anner w hile on the prem ises, and in accordance w ith Participating Entity policies and procedures, and all applicable law s.





  



Redlands Regular Meeting of 09-03-24 1937 of 1977
092222-CAT
Rev. 3/2022 5

6. PARTICIPATIN G EN TITY U SE AN D PU RCH ASIN G
A. ORDERS AN D PAYM EN T. To access the contracted Equipm ent, Products, or Services under this C ontract, a Participating Entity m ust clearly indicate to Supplier that it intends to access this C ontract; how ever, order flow and procedure w ill be developed jointly betw een Sourcew ell and Supplier. Typically, a Participating Entity w ill issue an order directly to Supplier or its authorized subsidiary, distributor, dealer, or reseller. If a Participating Entity issues a purchase order, it m ay use its ow n form s, but the purchase order should clearly note the applicable Sourcew ell contract num ber. All Participating Entity orders under this C ontract m ust be issued prior to expiration or cancellation of this C ontract; how ever, Supplier perform ance, Participating Entity paym ent obligations, and any applicable w arranty periods or other Supplier or Participating Entity obligations m ay extend beyond the term of this C ontract.

Supplier’s acceptable form s of paym ent are included in its attached Proposal. Participating Entities w ill be solely responsible for paym ent and Sourcew ell will have no liability for any unpaid invoice of any Participating Entity.

B. ADDITION AL TERM S AN D C ON DITION S/PARTIC IPATIN G ADDEN DU M . Additional term s and conditions to a purchase order, or other required transaction docum entation, m ay be negotiated betw een a Participating Entity and Supplier, such as job or industry-specific requirem ents, legal requirem ents (e.g., affirm ative action or immigration status requirem ents), or specific local policy requirem ents. Som e Participating Entities m ay require the use of a Participating Addendum , the term s of w hich w ill be negotiated directly betw een the Participating Entity and the Supplier or its authorized dealers, distributors, or resellers, as applicable. Any negotiated additional term s and conditions m ust never be less favorable to the Participating Entity than w hat is contained in this C ontract.

C. SPEC IALIZED SERVIC E REQ U IREM EN TS. In the event that the Participating Entity requires service or specialized perform ance requirem ents not addressed in this C ontract (such as ecom m erce specifications, specialized delivery requirem ents, or other specifications and requirem ents), the Participating Entity and the Supplier m ay enter into a separate, standalone agreem ent, apart from this C ontract. Sourcew ell, including its agents and em ployees, will not be m ade a party to a claim for breach of such agreem ent.

D. TERM IN ATION OF ORDERS. Participating Entities m ay term inate an order, in w hole or in part, im m ediately upon notice to Supplier in the event of any of the follow ing events:

1.The Participating Entity fails to receive funding or appropriation from its governing body at levels sufficient to pay for the equipm ent, products, or services to be purchased; or

2.Federal, state, or provincial law s or regulations prohibit the purchase or change the Participating Entity’s requirem ents.





  



Redlands Regular Meeting of 09-03-24 1938 of 1977
092222-CAT
Rev. 3/2022 6
E. GOVERN IN G LAW AN D VEN U E. The governing law and venue for any action related to a Participating Entity’s order w ill be determ ined by the Participating Entity m aking the purchase.

7. CU STO M ER SERVICE
A. PRIM ARY AC C OU N T REPRESEN TATIVE. Supplier w ill assign an Account Representative to Sourcew ell for this C ontract and m ust provide prom pt notice to Sourcew ell if that person is changed. The Account Representative w ill be responsible for:

x M aintenance and m anagem ent of this C ontract;
x Tim ely response to all Sourcew ell and Participating Entity inquiries; and x Business review s to Sourcew ell and Participating Entities, if applicable.

B. BU SIN ESS REVIEW S. Supplier m ust perform a m inim um of one business review w ith Sourcew ell per contract year. The business review w ill cover sales to Participating Entities, pricing and contract term s, adm inistrative fees, sales data reports, perform ance issues, supply issues, custom er issues, and any other necessary inform ation.

8. REPO RT O N CO N TRACT SALES ACTIVITY AN D ADM IN ISTRATIVE FEE PAYM EN T A. C ON TRAC T SALES AC TIVITY REPORT. Each calendar quarter, Supplier m ust provide a contract sales activity report (Report) to the Sourcew ell Supplier Developm ent Adm inistrator assigned to this C ontract. Reports are due no later than 45 days after the end of each calendar quarter. A Report m ust be provided regardless of the num ber or am ount of sales during that quarter (i.e., if there are no sales, Supplier m ust subm it a report indicating no sales w ere m ade).

The Report m ust contain the follow ing fields:
x Participating Entity N am e (e.g., City of Staples Highw ay Departm ent); x Participating Entity Physical Street Address;
x Participating Entity C ity;
x Participating Entity State/Province;
x Participating Entity Zip/Postal C ode;
x Participating Entity C ontact N am e;
x Participating Entity C ontact Em ail Address;
x Participating Entity C ontact Telephone N um ber;
x Sourcew ell Assigned Entity/Participating Entity N um ber; x Item Purchased Description;
x Item Purchased Price;
x Sourcew ell Adm inistrative Fee Applied; and
x Date Purchase w as invoiced/sale w as recognized as revenue by Supplier. 




  



Redlands Regular Meeting of 09-03-24 1939 of 1977
092222-CAT
Rev. 3/2022 7
B.ADM IN ISTRATIVE FEE. In consideration for the support and services provided by Sourcew ell, the Supplier w ill pay an adm inistrative fee to Sourcew ell on all Equipm ent, Products, and Services provided to Participating Entities. The Adm inistrative Fee m ust be included in, and not added to, the pricing. Supplier m ay not charge Participating Entities m ore than the contracted price to offset the Adm inistrative Fee.

The Supplier w ill subm it paym ent to Sourcew ell for the percentage of adm inistrative fee stated in the Proposal m ultiplied by the total sales of all Equipm ent, Products, and Services purchased by Participating Entities under this C ontract during each calendar quarter. Paym ents should note the Supplier’s nam e and Sourcew ell-assigned contract num ber in the m em o; and m ust be m ailed to the address above “Attn: Accounts Receivable” or rem itted electronically to Sourcew ell’s banking institution per Sourcew ell’s Finance departm ent instructions. Paym ents m ust be received no later than 45 calendar days after the end of each calendar quarter.

Supplier agrees to cooperate w ith Sourcew ell in auditing transactions under this C ontract to ensure that the adm inistrative fee is paid on all item s purchased under this C ontract.

In the event the Supplier is delinquent in any undisputed adm inistrative fees, Sourcew ell reserves the right to cancel this C ontract and reject any proposal subm itted by the Supplier in any subsequent solicitation. In the event this C ontract is cancelled by either party prior to the C ontract’s expiration date, the adm inistrative fee paym ent w ill be due no m ore than 30 days from the cancellation date.

9. AU TH O RIZED REPRESEN TATIVE
Sourcew ell's Authorized Representative is its C hief Procurem ent Officer.

Supplier’s Authorized Representative is the person nam ed in the Supplier’s Proposal. If Supplier’s Authorized Representative changes at any tim e during this C ontract, Supplier m ust prom ptly notify Sourcew ell in w riting.

10.AU D IT, ASSIG N M EN T, AM EN D M EN TS, W AIVER, AN D CO N TRACT CO M PLETE A. AU DIT. Pursuant to M innesota Statutes Section 16C .05, subdivision 5, the books, records, docum ents, and accounting procedures and practices relevant to this C ontract are subject to exam ination by Sourcew ell or the M innesota State Auditor for a m inim um of six years from the end of this C ontract. This clause extends to Participating Entities as it relates to business conducted by that Participating Entity under this C ontract.

B. ASSIGN M EN T. N either party m ay assign or otherw ise transfer its rights or obligations under this C ontract w ithout the prior w ritten consent of the other party and a fully executed assignm ent agreem ent. Such consent w ill not be unreasonably w ithheld. Any prohibited 




  



Redlands Regular Meeting of 09-03-24 1940 of 1977
092222-CAT
Rev. 3/2022 8
assignm ent w ill be invalid. Provided, how ever, that C aterpillar is perm itted to subcontract certain of its rights and obligations to C aterpillar dealers for perform ance w ithout Sourcew ell’s prior w ritten consent.

C. AM EN DM EN TS. Any am endm ent to this C ontract m ust be in w riting and w ill not be effective until it has been duly executed by the parties.

D. W AIVER. Failure by either party to take action or assert any right under this C ontract w ill not be deem ed a w aiver of such right in the event of the continuation or repetition of the circum stances giving rise to such right. Any such w aiver m ust be in w riting and signed by the parties.

E. C ON TRAC T C OM PLETE. This C ontract represents the com plete agreem ent betw een the parties. N o other understanding regarding this C ontract, w hether w ritten or oral, m ay be used to bind either party. For any conflict betw een the attached Proposal and the term s set out in Articles 1-22 of this C ontract, the term s of Articles 1-22 w ill govern.

F. RELATION SHIP OF THE PARTIES. The relationship of the parties is one of independent contractors, each free to exercise judgm ent and discretion w ith regard to the conduct of their respective businesses. This C ontract does not create a partnership, joint venture, or any other relationship such as m aster-servant, or principal-agent.

11.IN D EM N ITY AN D H O LD H ARM LESS

Intentionally om itted.

12.G O VERN M EN T DATA PRACTICES
Supplier and Sourcew ell m ust com ply w ith the M innesota Governm ent Data Practices Act, Minnesota Statutes C hapter 13, as it applies to all data provided by or provided to Sourcew ell under this C ontract and as it applies to all data created, collected, received, m aintained, or dissem inated by the Supplier under this C ontract.

13.IN TELLECTU AL PRO PERTY, PU BLICITY, M ARKETIN G , AN D EN D O RSEM EN T A.IN TELLEC TU AL PROPERTY

1. Grant of License. During the term of this C ontract:
a. Sourcew ell grants to Supplier a royalty-free, w orldw ide, non-exclusive right and license to use the tradem ark(s) provided to Supplier by Sourcew ell in advertising and prom otional m aterials for the purpose of m arketing Sourcew ell’s relationship w ith Supplier.





  



Redlands Regular Meeting of 09-03-24 1941 of 1977
092222-CAT
Rev. 3/2022 9
b.Supplier grants to Sourcew ell a royalty-free, w orldw ide, non-exclusive right and license to use Supplier’s tradem arks in advertising and prom otional m aterials for the purpose of m arketing Supplier’s relationship w ith Sourcew ell.

2. Limited Right of Sublicense. The right and license granted herein includes a limited right of each party to grant sublicenses to their respective subsidiaries, distributors, dealers, resellers, m arketing representatives, and agents (collectively “Perm itted Sublicensees”) in advertising and prom otional m aterials for the purpose of m arketing the Parties’ relationship to Participating Entities. Any sublicense granted w ill be subject to the term s and conditions of this Article. Each party w ill be responsible for any breach of this Article by any of their respective sublicensees.

3.Use; Quality Control.
a. N either party m ay alter the other party’s tradem arks from the form provided and m ust com ply w ith rem oval requests as to specific uses of its tradem arks or logos.
b. Each party agrees to use, and to cause its Perm itted Sublicensees to use, the other party’s tradem arks only in good faith and in a dignified m anner consistent w ith such party’s use of the tradem arks. U pon w ritten notice to the breaching party, the breaching party has 30 days of the date of the w ritten notice to cure the breach or the license w ill be term inated.

4.Termination. U pon the term ination of this C ontract for any reason, each party, including Perm itted Sublicensees, will have 30 days to rem ove all Tradem arks from signage, w ebsites, and the like bearing the other party’s nam e or logo (excepting Sourcew ell’s pre-printed catalog of suppliers w hich m ay be used until the next printing). Supplier m ust return all m arketing and prom otional m aterials, including signage, provided by Sourcew ell, or dispose of it according to Sourcew ell’s w ritten directions.

B. PU BLIC ITY. Any publicity regarding the subject m atter of this C ontract m ust not be released without prior w ritten approval from the Authorized Representatives. Publicity includes notices, inform ational pam phlets, press releases, research, reports, signs, and similar public notices prepared by or for the Supplier individually or jointly w ith others, or any subcontractors, with respect to the program , publications, or services provided resulting from this C ontract.

C. M ARKETIN G. Any direct advertising, m arketing, or offers w ith Participating Entities m ust be approved by Sourcew ell. Send all approval requests to the Sourcew ell Supplier Developm ent Adm inistrator assigned to this C ontract.

D. EN DORSEM EN T. The Supplier m ust not claim that Sourcew ell endorses its Equipm ent, Products, or Services.





  



Redlands Regular Meeting of 09-03-24 1942 of 1977
092222-CAT
Rev. 3/2022 10

14.G O VERN IN G LAW , JU RISD ICTIO N , AN D VEN U E
The substantive and procedural law s of the State of M innesota w ill govern this C ontract. Venue for all legal proceedings arising out of this C ontract, or its breach, m ust be in the appropriate state court in Todd C ounty, Minnesota or federal court in Fergus Falls, Minnesota.

15.FO RCE M AJEU RE
N either party to this C ontract w ill be held responsible for delay or default caused by acts of God or other conditions that are beyond that party’s reasonable control. A party defaulting under this provision m ust provide the other party prom pt w ritten notice of the default.

16.SEVERABILITY
If any provision of this C ontract is found by a court of com petent jurisdiction to be illegal, unenforceable, or void then both parties w ill be relieved from all obligations arising from that provision. If the rem ainder of this C ontract is capable of being perform ed, it w ill not be affected by such determ ination or finding and m ust be fully perform ed.

17.PERFO RM AN CE, D EFAU LT, AN D REM ED IES
A. PERFORM AN C E. During the term of this C ontract, the parties w ill m onitor perform ance and address unresolved contract issues as follow s:

1. Notification. The parties m ust prom ptly notify each other of any know n dispute and w ork in good faith to resolve such dispute w ithin a reasonable period of tim e. If necessary, Sourcew ell and the Supplier w ill jointly develop a short briefing docum ent that describes the issue(s), relevant im pact, and positions of both parties.

2. Escalation. If parties are unable to resolve the issue in a tim ely m anner, as specified above, either Sourcew ell or Supplier m ay escalate the resolution of the issue to a higher level of m anagem ent. The Supplier w ill have 30 calendar days to cure an outstanding issue.

3. Performance while Dispute is Pending. N otw ithstanding the existence of a dispute, the Supplier m ust continue w ithout delay to carry out all of its responsibilities under the C ontract that are not affected by the dispute. If the Supplier fails to continue w ithout delay to perform its responsibilities under the C ontract, in the accom plishm ent of all undisputed w ork, the Supplier w ill bear any additional costs incurred by Sourcew ell and/or its Participating Entities as a result of such failure to proceed.

B. DEFAU LT AN D REM EDIES. Either of the follow ing constitutes cause to declare this C ontract, or any Participating Entity order under this C ontract, in default:

1. N onperform ance of contractual requirem ents, or

2. A m aterial breach of any term or condition of this C ontract. 




  



Redlands Regular Meeting of 09-03-24 1943 of 1977
092222-CAT
Rev. 3/2022 11
The party claiming default m ust provide w ritten notice of the default, with 30 calendar days to cure the default. Tim e allow ed for cure w ill not diminish or eliminate any liability for liquidated or other dam ages. If the default rem ains after the opportunity for cure, the non-defaulting party m ay:
x Exercise any rem edy provided by law or equity, or
x Term inate the C ontract or any portion thereof, including any orders issued against the C ontract.

18.IN SU RAN CE

A. REQ U IREM EN TS. At its ow n expense, Supplier m ust m aintain insurance policy(ies) in effect at all tim es during the perform ance of this C ontract w ith insurance com pany(ies) licensed or authorized to do business in the State of M innesota having an “AM BEST” rating of A- or better, with coverage and limits of insurance not less than the follow ing:

1. Workers’ Compensation and Employer’s Liability.

W orkers’ C om pensation: As required by any applicable law or regulation.

Em ployer's Liability Insurance: m ust be provided in am ounts not less than listed below :

Minim um limits:
$500,000 each accident for bodily injury by accident
$500,000 policy limit for bodily injury by disease
$500,000 each em ployee for bodily injury by disease

2. Commercial General Liability Insurance. Supplier w ill m aintain insurance covering its operations, with coverage on an occurrence basis, and m ust be subject to term s no less broad than the Insurance Services Office (“ISO”) C om m ercial General Liability Form C G0001 (2001 or new er edition), or equivalent. At a m inim um , coverage m ust include liability arising from prem ises, operations, bodily injury and property dam age, independent contractors, products-com pleted operations including construction defect, contractual liability, blanket contractual liability, and personal injury and advertising injury. All required limits, term s and conditions of coverage m ust be m aintained during the term of this C ontract.

Minim um Limits:
$1,000,000 each occurrence Bodily Injury and Property Dam age $1,000,000 Personal and Advertising Injury
$2,000,000 aggregate for products liability-com pleted operations $2,000,000 general aggregate

3. Commercial Automobile Liability Insurance. During the term of this C ontract, Supplier w ill m aintain insurance covering all ow ned, hired, and non-ow ned autom obiles in limits of liability not less than indicated below . The coverage m ust be subject to term s 




  



Redlands Regular Meeting of 09-03-24 1944 of 1977
092222-CAT
Rev. 3/2022 12
no less broad than ISO Business Auto C overage Form C A 0001 (2010 edition or new er), or equivalent.

Minim um Limits:
$1,000,000 each accident, com bined single limit

4. Umbrella Insurance. During the term of this C ontract, Supplier w ill m aintain um brella coverage over Em ployer’s Liability, C om m ercial General Liability, and C om m ercial Autom obile.

Minim um Limits:
$2,000,000

5. Professional/Technical, Errors and Omissions, and/or Miscellaneous Professional Liability. During the term of this C ontract, Supplier w ill m aintain coverage for all claim s the Supplier m ay becom e legally obligated to pay resulting from any actual or alleged negligent act, error, or om ission related to Supplier’s professional services required under this C ontract.

Minim um Limits:
$2,000,000 per claim or event
$2,000,000 – annual aggregate
Failure of Supplier to m aintain the required insurance w ill constitute a m aterial breach entitling Sourcew ell to im m ediately term inate this C ontract for default.

B. C ERTIFIC ATES OF IN SU RAN C E. Prior to com m encing under this C ontract, Supplier m ust furnish to Sourcew ell a certificate of insurance, as evidence of the insurance required under this C ontract. Prior to expiration of the policy(ies), renew al certificates m ust be m ailed to Sourcew ell, 202 12th Street N ortheast, P.O. Box 219, Staples, M N 56479 orsent to the Sourcew ell Supplier Developm ent Adm inistrator assigned to this C ontract. The certificates m ust be signed by a person authorized by the insurer(s) to bind coverage on their behalf.

Failure to request certificates of insurance by Sourcew ell, or failure of Supplier to provide certificates of insurance, in no w ay limits or relieves Supplier of its duties and responsibilities in this C ontract.

C. ADDITION AL IN SU RED EN DORSEM EN T AN D PRIM ARY AN D N ON -C ON TRIBU TORY IN SU RAN C E C LAU SE. Supplier agrees to list Sourcew ell and its Participating Entities, including their officers, agents, and em ployees, as an additional insured under the Supplier’s com m ercial general liability insurance policy w ith respect to liability arising out of activities, “operations,” or “w ork” perform ed by or on behalf of Supplier, and products and com pleted operations of Supplier. The policy provision(s) or endorsem ent(s) m ust further provide that coverage is prim ary and not excess over or contributory w ith any other valid, applicable, and collectible insurance or self-insurance in force for the additional insureds. A Participating Dealer m ay nam e a Participating Entity as an additional insured on a case-by-case basis. 




  



Redlands Regular Meeting of 09-03-24 1945 of 1977
092222-CAT
Rev. 3/2022 13
D. W AIVER OF SU BROGATION . Supplier w aives and m ust require (by endorsem ent or otherw ise) all its insurers to w aive subrogation rights against Sourcew ell and other additional insureds for losses paid under the insurance policies required by this C ontract or other insurance applicable to the Supplier or its subcontractors. The w aiver m ust apply to all deductibles and/or self-insured retentions applicable to the required or any other insurance m aintained by the Supplier or its subcontractors.

E. U M BRELLA/EXC ESS LIABILITY/SELF-IN SU RED RETEN TION . The limits required by this C ontract can be m et by either providing a prim ary policy or in com bination w ith um brella/excess liability policy(ies), or self-insured retention.

19.CO M PLIAN CE
A. LAW S AN D REGU LATION S. All Equipm ent, Products, or Services provided under this C ontract m ust com ply fully w ith applicable federal law s and regulations, and w ith the law s in the states and provinces in w hich the Equipm ent, Products, or Services are sold.

B. LIC EN SES. Supplier’s Participating Dealers m ust m aintain a valid and current status on all required federal, state/provincial, and local licenses, bonds, and perm its required for the operation of the business that the Supplier’s Participating Dealer conducts w ith Sourcew ell and Participating Entities.

20.BAN KRU PTCY, D EBARM EN T, O R SU SPEN SIO N CERTIFICATIO N Supplier certifies and w arrants that it is not in bankruptcy or that it has previously disclosed in w riting certain inform ation to Sourcew ell related to bankruptcy actions. If at any tim e during this C ontract Supplier declares bankruptcy, Supplier m ust im m ediately notify Sourcew ell in w riting.

Supplier certifies and w arrants that neither it nor its principals are presently debarred, suspended, proposed for debarm ent, declared ineligible, or voluntarily excluded from program s operated by the State of M innesota; the U nited States federal governm ent or the C anadian governm ent, as applicable; or any Participating Entity. Supplier certifies and w arrants that neither it nor its principals have been convicted of a criminal offense related to the subject m atter of this C ontract. Supplier further w arrants that it w ill provide im m ediate w ritten notice to Sourcew ell if this certification changes at any tim e.

21.PRO VISIO N S FO R N O N -U N ITED STATES FED ERAL EN TITY PRO CU REM EN TS U N D ER

U N ITED STATES FED ERAL AW ARD S O R O TH ER AW ARD S
Intentionally om itted.





  



Redlands Regular Meeting of 09-03-24 1946 of 1977
092222-CAT
Rev. 3/2022 14

22.CAN CELLATIO N
Sourcew ell or Supplier m ay cancel this C ontract at any tim e, with or w ithout cause, upon 60 days’ w ritten notice to the other party. How ever, Sourcew ell m ay cancel this C ontract im m ediately upon discovery of a m aterial defect in any certification m ade in Supplier’s Proposal. C ancellation of this C ontract does not relieve either party of financial, product, or service obligations incurred or accrued prior to cancellation.

Sourcew ell C aterpillar Inc.

By: __________________________ By: __________________________ Jerem y Schw artz Jaim e M ineart
Title: C hief Procurem ent Officer Title: Vice President & General M anager Retail Electric Pow er Solutions
Date: ________________________ Date: ________________________ Approved:

By: __________________________
C had C oauette
Title: Executive Director/C EO
Date: ________________________





  






 
 







Redlands Regular Meeting of 09-03-24 1947 of 1977
5)3
(OHFWULFDO(QHUJ\3RZHU*HQHUDWLRQ(TXLSPHQWZLWK 5HODWHG3DUWV6XSSOLHVDQG6HUYLFHV
9HQGRU'HWDLOV
&RPSDQ\1DPH
&DWHUSLOODU
$GGUHVV

12
&RQQRU%OYG
,UYLQJ7;

&RQWDFW
-DLPH0LQHDUW
(PDLO
0LQHDUWB-DLPHB0#FDWFRP
3KRQH


)D[

+67

6XEPLVVLRQ'HWDLOV
&UHDWHG2Q
7KXUVGD\$XJXVW



6XEPLWWHG2Q
7KXUVGD\6HSWHPEHU


6XEPLWWHG%\
-DLPH0LQHDUW
(PDLO
0LQHDUWB-DLPHB0#FDWFRP
7UDQVDFWLRQ
G
D
IIFDFFHIDDGEIE
6XEPLWWHU
V,3$GGUHVV


Bid Number: RFP 092222 Vendor Name: Caterpillar





  



Redlands Regular Meeting of 09-03-24 1948 of 1977
6SHFLILFDWLRQV
7DEOH
3URSRVHU,GHQWLW\ $XWKRUL]HG5HSUHVHQWDWLYHV
*HQHUDO,QVWUXFWLRQV
DSSOLHVWRDOO7DEOHV
6RXUFHZHOOSUHIHUVDEULHIEXWWKRURXJKUHVSRQVHWRHDFKTXHVWLRQ'RQRWPHUHO\DWWDFK DGGLWLRQDOGRFXPHQWVWR\RXUUHVSRQVHZLWKRXWDOVRSURYLGLQJDVXEVWDQWLYHUHVSRQVH'RQRWOHDYHDQVZHUVEODQN UHVSRQG³1$´LIWKH
TXHVWLRQGRHVQRWDSSO\WR\RX
SUHIHUDEO\ZLWKDQH[SODQDWLRQ

/LQH
,WHP 4XHVWLRQ 5HVSRQVH

 3URSRVHUௐ/HJDOௐ1DPHௐ
RQHௐOHJDOௐHQWLW\ௐRQO\

ௐௐ

,QௐWKHௐHYHQWௐRIௐDZDUGௐZLOOௐH[HFXWHௐWKHௐ
UHVXOWLQJௐFRQWUDFWௐDVௐ6XSSOLHU

&DWHUSLOODUௐ,QF


 ,GHQWLI\ௐDOOௐVXEVLGLDU\ௐHQWLWLHVௐRIௐWKHௐ3URSRVHUௐ
ZKRVHௐHTXLSPHQWௐSURGXFWVௐRUௐVHUYLFHVௐDUHௐ
LQFOXGHGௐLQௐWKHௐ3URSRVDO
1$


 ,GHQWLI\ௐDOOௐDSSOLFDEOHௐDVVXPHGௐQDPHVௐRUௐ'%$ௐ
QDPHVௐRIௐWKHௐ3URSRVHUௐRUௐ3URSRVHU
Vௐ
VXEVLGLDULHVௐLQௐ/LQHௐௐRUௐ/LQHௐௐDERYH
1$


 3URYLGHௐ\RXUௐ&$*(ௐFRGHௐRUௐ8QLTXHௐ(QWLW\ௐ
,GHQWLILHUௐ
6$0

 

 3URSRVHUௐ3K\VLFDOௐ$GGUHVV
ௐ1ௐ2
&RQQRUௐ%OYGௐ6WHௐௐ,UYLQJௐ7;ௐ


 3URSRVHUௐZHEVLWHௐDGGUHVVௐ
RUௐDGGUHVVHV

KWWSV
ZZZFDWHUSLOODUFRPௐKWWSV
ZZZFDWFRPHQB86KWPO 

 3URSRVHU
Vௐ$XWKRUL]HGௐ5HSUHVHQWDWLYHௐ
QDPHௐ
WLWOHௐDGGUHVVௐHPDLOௐDGGUHVVௐ ௐSKRQH
ௐ
7KHௐ
UHSUHVHQWDWLYHௐPXVWௐKDYHௐDXWKRULW\ௐWRௐVLJQௐ
WKHௐ³3URSRVHU¶Vௐ$VVXUDQFHௐRIௐ&RPSOLDQFH´ௐRQௐ
EHKDOIௐRIௐWKHௐ3URSRVHUௐDQGௐLQௐWKHௐHYHQWௐRIௐ
DZDUGௐZLOOௐEHௐH[SHFWHGௐWRௐH[HFXWHௐWKHௐ
UHVXOWLQJௐFRQWUDFW

$XWKRUL]HGௐ5HS
ௐ-DLPHௐ0LQHDUW
7LWOH
ௐ9LFHௐ3UHVLGHQWௐ ௐ*HQHUDOௐ0DQDJHUௐ5HWDLOௐ(OHFWULFௐ3RZHUௐ6ROXWLRQV $GGUHVV
ௐௐ1ௐ2
&RQQRUௐ%OYGௐ6WHௐௐ,UYLQJௐ7;ௐ

(PDLO
ௐ0LQHDUWB-DLPHB0#FDWFRP
3KRQH
ௐ


ௐ


 3URSRVHU
VௐSULPDU\ௐFRQWDFWௐIRUௐWKLVௐSURSRVDOௐ

QDPHௐWLWOHௐDGGUHVVௐHPDLOௐDGGUHVVௐ ௐSKRQH

3ULPDU\ௐ&RQWDFW
ௐ1LFROHௐ:DUQVWHGW
7LWOH
ௐ7HUULWRU\ௐ6DOHVௐ0DQDJHU
$GGUHVV
ௐௐ1ௐ2
&RQQRUௐ%OYGௐ6WHௐௐ,UYLQJௐ7;ௐ

(PDLO
ௐ:DUQVWHGWBQLFROHBD#FDWFRP
3KRQH
ௐ

ௐ


3URSRVHU
VௐRWKHUௐFRQWDFWVௐIRUௐWKLVௐSURSRVDOௐLIௐ
DQ\ௐ
QDPHௐWLWOHௐDGGUHVVௐHPDLOௐDGGUHVVௐ ௐ
SKRQH

2WKHUௐ&RQWDFW
ௐ6WHYHௐ7XUQHU
7LWOH
ௐ$PHULFDVௐ6DOHVௐ0DQDJHUௐ5HWDLOௐ(OHFWULFௐ3RZHUௐ6ROXWLRQV $GGUHVV
ௐௐ1ௐ2
&RQQRUௐ%OYGௐ6WHௐௐ,UYLQJௐ7;ௐ

(PDLO
ௐ7XUQHUB6WHSKHQB0#FDWFRP
3KRQH
ௐ


ௐ
7DEOH
&RPSDQ\,QIRUPDWLRQDQG)LQDQFLDO6WUHQJWK
/LQH
,WHP 4XHVWLRQ 5HVSRQVH

Bid Number: RFP 092222 Vendor Name: Caterpillar





  



Redlands Regular Meeting of 09-03-24 1949 of 1977
 3URYLGHௐDௐEULHIௐKLVWRU\ௐRIௐ\RXUௐFRPSDQ\ௐ
LQFOXGLQJௐ\RXUௐFRPSDQ\¶VௐFRUHௐYDOXHVௐ
EXVLQHVVௐSKLORVRSK\ௐDQGௐLQGXVWU\ௐORQJHYLW\ௐ
UHODWHGௐWRௐWKHௐUHTXHVWHGௐHTXLSPHQWௐSURGXFWVௐ
RUௐVHUYLFHV
&DWHUSLOODUௐZDVௐIRXQGHGௐLQௐ
ௐZKHQௐWZRௐHQWUHSUHQHXUVௐPHUJHGௐWKHLUௐFRPSDQLHV
ௐௐ
+ROWௐ0DQXIDFWXULQJௐ&RPSDQ\ௐDQGௐ&/ௐ%HVWௐ7UDFWRUௐ&RPSDQ\ௐ7KHௐPHUJHUௐZDVௐDௐ JUHDWௐVXFFHVVௐEHFDXVHௐWKHௐHWKLFVௐRIௐERWKௐPHQௐZHUHௐIRFXVHGௐRQௐKLJKௐTXDOLW\ௐ SURGXFWVௐDQGௐWKHௐEHVWௐFXVWRPHUௐVXSSRUW
7KHௐNH\ௐWRௐWKLVௐVDWLVIDFWLRQௐLVௐWZRIROG
ௐEXLOGௐWKHௐEHVWௐSURGXFWVௐDQGௐHPSRZHUௐRXUௐ
GHDOHUVௐWRௐRIIHUௐWKHௐEHVWௐVXSSRUWௐ7KURXJKௐWKLVௐFRPELQDWLRQௐZHௐDUHௐSURXGௐWRௐSURYHௐ WKDWௐRXUௐSURGXFWVௐRIIHUௐWKHௐEHVWௐYDOXHௐWRௐRXUௐFXVWRPHUVௐUHJDUGOHVVௐRIௐZKHUHௐWKH\ௐDUHௐ ORFDWHG
&DWHUSLOODUௐSURGXFHGௐLWVௐILUVWௐGLHVHOௐHQJLQHௐLQௐ

ௐ,Qௐ
ௐ&DWHUSLOODUௐFUHDWHGௐDௐ
GLYLVLRQௐGHGLFDWHGௐWRௐWKHௐVSHFLILFௐQHHGVௐRIௐDௐEURDGௐUDQJHௐRIௐGLHVHOௐHQJLQHௐ FXVWRPHUVௐLQFOXGLQJௐSRZHUௐJHQHUDWLRQௐ,QௐௐWKHௐ(QHUJ\ௐ ௐ7UDQVSRUWDWLRQௐ VHJPHQWௐLQFOXGLQJௐDOOௐ3RZHUௐ*HQHUDWLRQௐGLYLVLRQVௐFRQWULEXWHGௐPRUHௐWKDQௐௐ%LOOLRQௐ RIௐUHYHQXHௐJOREDOO\ௐIRUௐ&DWHUSLOODUௐ,QFௐZLWKௐPRUHௐWKDQௐௐ%LOOLRQௐLQௐ1RUWKௐ$PHULFDௐ DORQH
6LQFHௐWKHௐIRXQGLQJௐ&DWHUSLOODUௐ,QFௐKDVௐUHWDLQHGௐWKHௐFXOWXUHௐRIௐIRFXVLQJௐRQௐFXVWRPHUௐ QHHGVௐDQGௐVXSSRUWLQJௐSURGXFWVௐDIWHUௐWKHௐVDOHௐ2XUௐFRPSDQ\ௐFXOWXUHௐLVௐNHHQO\ௐ IRFXVHGௐRQௐFXVWRPHUௐVDWLVIDFWLRQௐDQGௐHYHU\ௐHPSOR\HHௐUHDOL]HVௐWKDWௐDௐFXVWRPHU Vௐ
H[SHULHQFHௐXVLQJௐWKHௐSURGXFWௐZLOOௐGHWHUPLQHௐZKHWKHUௐKHௐRUௐVKHௐZLOOௐSXUFKDVHௐDQRWKHUௐ RQH
&DWHUSLOODUௐKDVௐDௐUREXVWௐ&RGHௐRIௐ&RQGXFWௐWKDWௐFDQௐEHௐIRXQGௐDWௐ&DWHUSLOODUௐ_ௐ&RGHௐRIௐ &RQGXFWௐ_ௐ&DWHUSLOODUௐ9DOXHVௐLQௐ$FWLRQௐ+HUHௐLVௐDௐTXRWHௐIURPௐ-LPௐ8PSOHE\ௐ &DWHUSLOODUௐ&KLHIௐ([HFXWLYHௐ2IILFHUௐVXPPDUL]LQJௐWKLVௐFRGHௐDQGௐLWVௐVLJQLILFDQFHௐLQௐ &DWHUSLOODUௐFXOWXUHௐ³:HௐDUHௐSURXGௐWKDWௐWKHௐSHRSOHௐRQௐRXUௐWHDPௐFRPHௐIURPௐDFURVVௐ WKHௐJOREHௐZLWKௐGLYHUVHௐEDFNJURXQGVௐH[SHULHQFHVௐDQGௐSHUVSHFWLYHVௐ7KLVௐGLYHUVHௐ FXOWXUHௐDQGௐFKDUDFWHUௐPDNHௐXVௐVWURQJHUௐ:KDWௐXQLWHVௐXVௐZLWKLQௐWKLVௐGLYHUVLW\ௐLVௐDௐ FRPPRQௐVHWௐRIௐ9DOXHV
ௐWKDWௐZHௐDUHௐQRWௐMXVWௐDFFRXQWDEOHௐIRUௐWKHௐZRUNௐZHௐGR
ௐZHௐ
DOVRௐFDUHௐGHHSO\ௐDERXWௐKRZௐZHௐGRௐLWௐ2XUௐ&RGHௐRIௐ&RQGXFWௐGHILQHVௐWKRVHௐ9DOXHVௐLQௐ DFWLRQௐ±ZKDWௐZHௐVWDQGௐIRUௐDQGௐKRZௐZHௐFRQGXFWௐRXUVHOYHVௐZLWKௐRXUௐFXVWRPHUVௐ VXSSOLHUVௐDQGௐRQHௐDQRWKHUௐ,WVௐSXUSRVHௐLVௐQRWௐWRௐSURYLGHௐDௐVHWௐRIௐUXOHVௐWKDWௐFRYHUVௐ HYHU\ௐVLWXDWLRQௐRUௐFKDOOHQJHௐZHௐPD\ௐIDFHௐEXWௐWRௐJXLGHௐXVௐLQௐOLYLQJௐௐWKRVHௐௐYDOXHVௐௐ HYHU\ௐGD\ௐ7KHௐ&RGHௐRIௐ&RQGXFWௐH[SODLQVௐௐZKDWௐௐ,QWHJULW\ௐௐ([FHOOHQFHௐ7HDPZRUNௐ &RPPLWPHQWௐDQGௐ6XVWDLQDELOLW\ௐPHDQௐWRௐXVௐDQGௐKRZௐZHௐXVHௐWKHVHௐ9DOXHVௐWRௐPDNHௐ VRXQGௐHWKLFDOௐGHFLVLRQVௐ2XUௐ&RGHௐRIௐ&RQGXFWௐLVௐRQHௐRIௐWKHௐPRVWௐLPSRUWDQWௐ GRFXPHQWVௐZHௐSURGXFHௐDWௐ&DWHUSLOODUௐ
:HௐFDQௐSURYHௐPHDVXUDEOHௐDGYDQWDJHVௐLQௐWRWDOௐRZQLQJௐDQGௐRSHUDWLQJௐFRVWVௐDVௐZHOOௐ DVௐWDQJLEOHௐEHQHILWVௐLQௐWHUPVௐRIௐVWDQGDUGௐVDIHW\ௐIHDWXUHVௐWHOHPDWLFௐLQIRUPDWLRQௐ VKDULQJௐDQGௐPDQ\ௐWUDLQLQJௐDQGௐDSSOLFDWLRQௐVXSSRUWௐVHUYLFHVௐRIIHUHGௐE\ௐRXUௐGHDOHUV 

 :KDWௐDUHௐ\RXUௐFRPSDQ\¶VௐH[SHFWDWLRQVௐLQௐWKHௐ
HYHQWௐRIௐDQௐDZDUG"
&DWHUSLOODUௐLVௐKRQRUHGௐWRௐKDYHௐVHUYHGௐ6RXUFHZHOOௐDQGௐLWVௐPHPEHUVௐZKRௐKDYHௐ SXUFKDVHGௐ&DWௐFRQVWUXFWLRQௐHTXLSPHQWௐZRUNWRROVௐDQGௐHOHFWULFDOௐSRZHUௐJHQHUDWLRQௐ SURGXFWVௐWKURXJKௐ6RXUFHZHOOௐVLQFHௐௐ)XUWKHUPRUHௐZHௐDUHௐSURXGௐWRௐKDYHௐHDUQHGௐ WKHௐ6RXUFHZHOOௐ/HJDF\ௐ$ZDUGௐLQௐ
ௐ&DWHUSLOODUௐLVௐWKHௐWRSௐFRQWULEXWRUௐWRௐJHQHUDWRUௐ
VDOHVௐLQௐRXUௐFXUUHQWௐ3RZHUௐ*HQHUDWLRQௐDQGௐ6HUYLFHVௐFRQWUDFWௐ&$7ௐ7RJHWKHUௐ ZLWKௐWKHௐ0DFKLQHௐFRQWUDFWௐZHௐORRNௐIRUZDUGௐWRௐWKHௐRSSRUWXQLW\ௐWRௐIXUWKHUௐJURZௐ EXVLQHVVௐDQGௐVHUYHௐPHPEHUௐQHHGVௐWRJHWKHUௐLQௐWKLVௐQHZௐ3RZHUௐ*HQHUDWLRQௐFRQWUDFWௐ :LWKௐDYHUDJHௐௐJURZWKௐRYHUௐWKHௐSDVWௐௐ\HDUVௐZHௐZLOOௐEHௐGHGLFDWHGௐWRௐ FRQWLQXLQJௐZLWKௐWKLVௐDQQXDOௐJURZWK


Bid Number: RFP 092222 Vendor Name: Caterpillar





  



Redlands Regular Meeting of 09-03-24 1950 of 1977
 'HPRQVWUDWHௐ\RXUௐILQDQFLDOௐVWUHQJWKௐDQGௐ
VWDELOLW\ௐZLWKௐPHDQLQJIXOௐGDWDௐ7KLVௐFRXOGௐ
LQFOXGHௐVXFKௐLWHPVௐDVௐILQDQFLDOௐVWDWHPHQWVௐ
6(&ௐILOLQJVௐFUHGLWௐDQGௐERQGௐUDWLQJVௐOHWWHUVௐ
RIௐFUHGLWௐDQGௐGHWDLOHGௐUHIHUHQFHௐOHWWHUVௐ
8SORDGௐVXSSRUWLQJௐGRFXPHQWVௐ
DVௐDSSOLFDEOH
ௐ
LQௐWKHௐGRFXPHQWௐXSORDGௐVHFWLRQௐRIௐ\RXUௐ
UHVSRQVH
0DLQWDLQLQJௐILQDQFLDOௐVWUHQJWKௐLVௐDௐFULWLFDOௐSULRULW\ௐIRUௐ&DWHUSLOODUௐ:HௐUHFHLYHௐGHEWௐௐ UDWLQJVௐIURPௐWKHௐPDMRUௐFUHGLWௐUDWLQJௐDJHQFLHVௐ&DWHUSLOODUௐLVௐPLG$ௐUDWHGௐE\ௐ6 3ௐ DQGௐ)LWFKௐDQGௐKDVௐDௐORZ$ௐUDWLQJௐZLWKௐDௐSRVLWLYHௐRXWORRNௐIURPௐ0RRG\ Vௐ
0DLQWDLQLQJௐRXUௐPLG$ௐFUHGLWௐUDWLQJௐLVௐFULWLFDOௐWRௐRXUௐFDVKௐGHSOR\PHQWௐSULRULWLHVௐ 'XHௐWRௐRXUௐSUXGHQWௐIRFXVௐRQௐILQDQFLDOௐVWUHQJWKௐRQௐDௐFRPSDUDWLYHௐEDVLVௐ&DWHUSLOODUௐ KDVௐJHQHUDOO\ௐGHPRQVWUDWHGௐKLJKHUௐSURILWDELOLW\ௐORZHUௐOHYHUDJHௐDQGௐEHWWHUௐOLTXLGLW\ WKDQௐRXUௐFRPSHWLWRUௐSHHUௐJURXSௐ2XUௐOLTXLGLW\ௐSRVLWLRQௐLVௐH[WUHPHO\ௐVWURQJௐZLWKௐ W\SLFDOO\ௐWKHௐKLJKHVWௐSHUFHQWDJHௐRIௐFDVKௐDVௐDௐSHUFHQWௐRIௐWRWDOௐDVVHWVௐRQௐWKHௐௐ EDODQFHௐVKHHWௐYVௐRXUௐFRPSHWLWRUV
3OHDVHௐVHHௐௐ,QYHVWRUௐ3UHVHQWDWLRQௐZKLFKௐSURYLGHVௐDGGLWLRQDOௐGHWDLOVௐDERXWௐRXUௐ ILQDQFLDOௐSRVLWLRQௐ7KHௐIXOOௐWH[WௐRIௐWKHௐ6(&ௐILOLQJௐGRFXPHQWVௐFDQௐEHௐIRXQGௐRQௐRXUௐ SXEOLFௐZHEVLWH
ௐKWWSV
LQYHVWRUVFDWHUSLOODUFRPILQDQFLDOVVHFILOLQJVGHIDXOWDVS[ ,QௐௐIXOOௐ\HDUௐVDOHVௐDQGௐUHYHQXHVௐZHUHௐ
%ௐ(QWHUSULVHௐRSHUDWLQJௐFDVKௐ
)ORZௐZDVௐ%ௐ'XULQJௐWKHௐ\HDUௐWKHௐFRPSDQ\ௐSDLGௐGLYLGHQGVௐRIௐ%ௐDQGௐ UHSXUFKDVHGௐ%ௐRIௐ&DWHUSLOODUௐFRPPRQௐVWRFNௐ/LTXLGLW\ௐUHPDLQHGௐVWURQJௐZLWK DQௐHQWHUSULVHௐFDVKௐEDODQFHௐRIௐ
%ௐDWௐWKHௐHQGௐRIௐௐ$IWHUௐSD\LQJௐ
XQLQWHUUXSWHGௐULVLQJௐDQQXDOௐGLYLGHQGVௐIRUௐPRUHௐWKDQௐWZRௐGHFDGHVௐ&DWHUSLOODUௐ,QF

1<6(
&$7
ௐUHDFKHGௐWKHௐWKௐFRQVHFXWLYHௐ\HDUௐPDUNௐIRUௐLQFOXVLRQௐLQௐWKHௐHOLWHௐJURXSௐ RIௐFRPSDQLHVௐGHVLJQDWHGௐDVௐ'LYLGHQGௐ$ULVWRFUDWVௐ,QௐDGGLWLRQௐWRௐDௐPLQLPXPௐRIௐௐ FRQVHFXWLYHௐ\HDUVௐRIௐGLYLGHQGௐKLNHVௐDௐFRPSDQ\ௐPXVWௐEHௐDௐFRPSRQHQWௐRIௐWKHௐ 6 3ௐௐLQGH[ௐDQGௐDQGௐPXVWௐKDYHௐDௐPDUNHWௐFDSLWDOL]DWLRQௐRIௐDWௐOHDVWௐ%ௐWRௐ TXDOLI\ௐDVௐDௐ'LYLGHQGௐ$ULVWRFUDW


 :KDWௐLVௐ\RXUௐ86ௐPDUNHWௐVKDUHௐIRUௐWKHௐ
VROXWLRQVௐWKDWௐ\RXௐDUHௐSURSRVLQJ"
0DUNHWௐVKDUHௐLQIRUPDWLRQௐEH\RQGௐZKDWௐLVௐPDGHௐSXEOLFO\ௐDYDLODEOHௐWKURXJKௐRXUௐDQQXDOௐ UHSRUWVௐLVௐFRQVLGHUHGௐFRQILGHQWLDOௐ0DUNHWௐVKDUHௐGDWDௐLVௐQRWௐUHDGLO\ௐDYDLODEOHௐZLWKLQௐ WKHௐLQGXVWU\ௐ7KHUHௐDUHௐQRWௐPDQ\ௐPDQXIDFWXUHUVௐRIIHULQJௐSURGXFWVௐIRUௐWKHௐ86ௐDQGௐ &DQDGDௐWKDWௐPHHWௐWKHௐUHTXLUHGௐUHJXODWLRQVௐ&DWHUSLOODUௐLVௐDௐVLJQLILFDQWௐFRQWULEXWRUௐWRௐ WKHௐRYHUDOOௐ3RZHUௐ*HQHUDWLRQௐVHFWRUௐZLWKLQௐWKHௐ86ௐDQGௐ&DQDGD 

 :KDWௐLVௐ\RXUௐ&DQDGLDQௐPDUNHWௐVKDUHௐIRUௐWKHௐ
VROXWLRQVௐWKDWௐ\RXௐDUHௐSURSRVLQJ"
0DUNHWௐVKDUHௐLQIRUPDWLRQௐEH\RQGௐZKDWௐLVௐPDGHௐSXEOLFO\ௐDYDLODEOHௐWKURXJKௐRXUௐDQQXDOௐ UHSRUWVௐLVௐFRQVLGHUHGௐFRQILGHQWLDOௐ0DUNHWௐVKDUHௐGDWDௐLVௐQRWௐUHDGLO\ௐDYDLODEOHௐZLWKLQௐ WKHௐLQGXVWU\ௐ7KHUHௐDUHௐQRWௐPDQ\ௐPDQXIDFWXUHUVௐRIIHULQJௐSURGXFWVௐIRUௐWKHௐ86ௐDQGௐ &DQDGDௐWKDWௐPHHWௐWKHௐUHTXLUHGௐUHJXODWLRQVௐ&DWHUSLOODUௐLVௐDௐVLJQLILFDQWௐFRQWULEXWRUௐWRௐ WKHௐRYHUDOOௐ3RZHUௐ*HQHUDWLRQௐVHFWRUௐZLWKLQௐWKHௐ86ௐDQGௐ&DQDGD 

 +DVௐ\RXUௐEXVLQHVVௐHYHUௐSHWLWLRQHGௐIRUௐ
EDQNUXSWF\ௐSURWHFWLRQ"ௐ,IௐVRௐH[SODLQௐLQௐGHWDLO
1Rௐ&DWHUSLOODUௐKDVௐQHYHUௐILOHGௐIRUௐEDQNUXSWF\ 

 +RZௐLVௐ\RXUௐRUJDQL]DWLRQௐEHVWௐGHVFULEHG
ௐLVௐ
LWௐDௐPDQXIDFWXUHUௐDௐGLVWULEXWRUGHDOHUUHVHOOHUௐ
RUௐDௐVHUYLFHௐSURYLGHU"ௐௐ$QVZHUௐZKLFKHYHUௐ
TXHVWLRQௐ
HLWKHUௐD
ௐRUௐE
ௐMXVWௐEHORZ
ௐEHVWௐ
DSSOLHVௐWRௐ\RXUௐRUJDQL]DWLRQ
D
ௐௐௐௐ,Iௐ\RXUௐFRPSDQ\ௐLVௐEHVWௐGHVFULEHGௐDVௐ
DௐGLVWULEXWRUGHDOHUUHVHOOHUௐ
RUௐVLPLODUௐHQWLW\
ௐ
SURYLGHௐ\RXUௐZULWWHQௐDXWKRUL]DWLRQௐWRௐDFWௐDVௐDௐ
GLVWULEXWRUGHDOHUUHVHOOHUௐIRUௐWKHௐPDQXIDFWXUHUௐ
RIௐWKHௐSURGXFWVௐSURSRVHGௐLQௐWKLVௐ5)3ௐ,Iௐ
DSSOLFDEOHௐLVௐ\RXUௐGHDOHUௐQHWZRUNௐ
LQGHSHQGHQWௐRUௐFRPSDQ\ௐRZQHG"
E
ௐௐௐௐ,Iௐ\RXUௐFRPSDQ\ௐLVௐEHVWௐGHVFULEHGௐDVௐ
DௐPDQXIDFWXUHUௐRUௐVHUYLFHௐSURYLGHUௐGHVFULEHௐ
\RXUௐUHODWLRQVKLSௐZLWKௐ\RXUௐVDOHVௐDQGௐVHUYLFHௐ
IRUFHௐDQGௐZLWKௐ\RXUௐGHDOHUௐQHWZRUNௐLQௐ
GHOLYHULQJௐWKHௐSURGXFWVௐDQGௐVHUYLFHVௐ
SURSRVHGௐLQௐWKLVௐ5)3ௐ$UHௐWKHVHௐLQGLYLGXDOVௐ
\RXUௐHPSOR\HHVௐRUௐWKHௐHPSOR\HHVௐRIௐDௐWKLUGௐ
SDUW\"
&DWHUSLOODUௐLVௐDௐZRUOGௐFODVVௐPDQXIDFWXUHUௐZKLFKௐGLVWULEXWHVௐSURGXFWVௐWKURXJKௐDௐYDVWௐ DQGௐFDSDEOHௐGHDOHUௐQHWZRUNௐ2XUௐGHDOHUVௐDUHௐVWURQJௐLQGHSHQGHQWௐFRPSDQLHVௐDQGௐLQௐ 1RUWKௐ$PHULFDௐDORQHௐWKH\ௐKDYHௐDௐFRPELQHGௐQHWௐZRUWKௐRIௐELOOLRQVௐRIௐGROODUVௐ7KHLUௐ ODUJHௐYDOXDWLRQௐLVௐDௐFRPSHWLWLYHௐDGYDQWDJHௐEHFDXVHௐLWௐDOORZVௐWKHPௐWRௐKDYHௐWKHௐ LQIUDVWUXFWXUHௐWRௐVXSSRUWௐFXVWRPHUVௐUHJDUGOHVVௐRIௐORFDWLRQௐLQGXVWU\ௐIOHHWௐVL]HௐRUௐ DSSOLFDWLRQௐ:HௐEHOLHYHௐRXUௐGHDOHUVௐKDYHௐWKHௐODUJHVWௐDPRXQWௐRIௐVHUYLFHௐSDUWVௐ DYDLODEOHௐLQௐWKHLUௐLQYHQWRU\ௐௐ
$QRWKHUௐDGYDQWDJHௐRIௐLQGHSHQGHQWO\ௐRZQHGௐGHDOHUVௐLVௐWKDWௐWKH\ௐNQRZௐWKHLUௐFXVWRPHUVௐ DQGௐPDUNHWௐZHOOௐ7KH\ௐWDLORUௐWKHLUௐVHUYLFHVௐVSHFLILFDOO\ௐWRௐWKHLUௐFXVWRPHUV ௐQHHGVௐௐ
&DWHUSLOODUௐDQGௐHDFKௐGHDOHUௐKDYHௐVLJQHGௐDௐVDOHVௐDQGௐVHUYLFHௐDJUHHPHQWௐWKDWௐ RXWOLQHVௐWKHௐVSHFLILFௐH[SHFWDWLRQVௐIURPௐERWKௐSDUWLHVௐ,QௐDௐEURDGௐRYHUYLHZௐ&DWHUSLOODUௐ PDQXIDFWXUHVௐSURGXFWVௐDQGௐVHOOVௐWKHPௐWRௐRXUௐGHDOHUVௐ7KHௐGHDOHUVௐWKHQௐVHOOௐWKRVHௐ SURGXFWVௐWRௐFXVWRPHUVௐ&DWHUSLOODUௐGRHVௐQRWௐVHOOௐGLUHFWO\ௐWRௐVWDWHௐDQGௐORFDOௐ JRYHUQPHQWVௐ
7KRXJKௐZHௐZLOOௐVLJQௐWKLVௐFRQWUDFWௐDVௐDௐPDQXIDFWXUHUௐRXUௐGHDOHUVௐZLOOௐEHௐJLYHQௐWKHௐ RSSRUWXQLW\ௐWRௐDYDLOௐWKHPVHOYHVௐRIௐWKHௐRSSRUWXQLW\ௐSUHVHQWHGௐE\ௐWKHௐFRQWUDFWௐDQGௐZLOOௐ H[HFXWHௐDOOௐWKHௐWUDQVDFWLRQVௐZLWKௐJRYHUQPHQWDOௐFXVWRPHUVௐDVௐWKH\ௐGRௐWRGD\ௐ7KLVௐ LQFOXGHVௐEXWௐLVௐQRWௐOLPLWHGௐWRௐFRQVXOWDWLRQௐTXRWLQJௐDFFHSWLQJௐSD\PHQWௐGHOLYHU\ௐ ZDUUDQW\ௐVXSSRUWௐSDUWVௐVDOHVௐDQGௐVHUYLFHௐ7KLVௐLVௐQRௐGLIIHUHQWௐWKDQௐVDOHVௐRFFXUULQJௐ RXWௐWKHௐWHUPVௐRIௐWKLVௐDJUHHPHQWௐ
&DWHUSLOODUௐGHDOHUVௐKHDUWLO\ௐHPEUDFHௐWKHௐRWKHUௐ6RXUFHZHOOௐFRQWUDFWVௐFXUUHQWO\ௐDYDLODEOHௐ WRௐWKHPௐ

&$7ௐ&$7ௐDQGௐ&$7
ௐ7KH\ௐKDYHௐDOOௐEHHQௐWUDLQHGௐ
RQௐFRQWUDFWௐXVDJHௐ,QௐIDFWௐWKHௐFXUUHQWௐ(OHFWULFௐ3RZHUௐFRQWUDFWௐLVௐOHYHUDJHGௐE\ௐDWௐ OHDVWௐௐRIௐRXUௐGHDOHUVௐLQௐ1RUWKௐ$PHULFDௐ&DWHUSLOODUௐRIIHUVௐVSHFLILFௐGLVFRXQWVௐWRௐ 6RXUFHZHOOௐPHPEHUVௐௐ%\ௐXVLQJௐDQ\ௐ6RXUFHZHOOௐ&RQWUDFWௐRXUௐGHDOHUVௐDJUHHௐWRௐ KRQRUௐWKRVHௐGLVFRXQWV


 ,IௐDSSOLFDEOHௐSURYLGHௐDௐGHWDLOHGௐH[SODQDWLRQௐ
RXWOLQLQJௐWKHௐOLFHQVHVௐDQGௐFHUWLILFDWLRQVௐWKDWௐ
DUHௐERWKௐUHTXLUHGௐWRௐEHௐKHOGௐDQGௐDFWXDOO\ௐ
KHOGௐE\ௐ\RXUௐRUJDQL]DWLRQௐ
LQFOXGLQJௐWKLUGௐ
SDUWLHVௐDQGௐVXEFRQWUDFWRUVௐWKDWௐ\RXௐXVH
ௐLQௐ
SXUVXLWௐRIௐWKHௐEXVLQHVVௐFRQWHPSODWHGௐE\ௐWKLVௐ
5)3
&DWHUSLOODUௐDQGௐLWVௐVXEVLGLDULHVௐRSHUDWHௐDFURVVௐWKHௐJOREHௐLQௐDௐYDULHW\ௐRIௐPDUNHWVௐWKDWௐ UHTXLUHௐ&DWHUSLOODUௐWRௐDGKHUHௐWRௐDOOௐORFDOO\ௐPDQGDWHGௐODZVௐDQGௐUHJXODWLRQVௐLQௐRUGHUௐWRௐ GRௐEXVLQHVVௐ:LWKௐUHJDUGVௐWRௐWKHௐWHUULWRULHVௐFRYHUHGௐE\ௐWKLVௐ5)3ௐ&DWHUSLOODUௐZLOOௐ FRPSO\ௐZLWKௐDSSOLFDEOHௐODZVௐLQௐRUGHUௐWRௐGRௐEXVLQHVVௐLQௐWKHௐWHUULWRULHVௐGHVFULEHGௐ KHUHLQ


Bid Number: RFP 092222 Vendor Name: Caterpillar





  



Redlands Regular Meeting of 09-03-24 1951 of 1977
 3URYLGHௐDOOௐ³6XVSHQVLRQௐRUௐ'HEDUPHQW´ௐ
LQIRUPDWLRQௐWKDWௐKDVௐDSSOLHGௐWRௐ\RXUௐ
RUJDQL]DWLRQௐGXULQJௐWKHௐSDVWௐWHQௐ\HDUV
&DWHUSLOODUௐKDVௐQRWௐEHHQௐVXVSHQGHGௐRUௐGLVEDUUHGௐLQௐWUDGLQJௐKLVWRU\ 

7DEOH
,QGXVWU\5HFRJQLWLRQ 0DUNHWSODFH6XFFHVV
/LQH
,WHP 4XHVWLRQ 5HVSRQVH


'HVFULEHௐDQ\ௐUHOHYDQWௐLQGXVWU\ௐDZDUGVௐRUௐ
UHFRJQLWLRQௐWKDWௐ\RXUௐFRPSDQ\ௐKDVௐUHFHLYHGௐ
LQௐWKHௐSDVWௐILYHௐ\HDUV
3OHDVHௐQRWH
ௐ7RௐOLVWௐDOOௐWKHௐDZDUGVௐUHFHLYHGௐLQௐWKHௐSDVWௐௐ\HDUVௐZRXOGௐXQQHFHVVDULO\ௐ OHQJWKHQௐRXUௐUHVSRQVHௐௐ)RUௐEUHYLW\ௐZHௐDUHௐKLJKOLJKWLQJௐVRPHௐUHFRJQLWLRQௐUHFHLYHGௐ LQௐௐௐDQGௐௐ$OVRௐQRWHௐWKHUHௐDUHௐPDQ\ௐJOREDOௐDZDUGVௐௐ )RUWXQHௐ0DJD]LQHௐௐRQௐWKHௐ)RUWXQHௐௐ
)RUWXQHௐ0DJD]LQHௐ:RUOG
Vௐ0RVWௐ$GPLUHGௐ&RPSDQLHVௐ
:RUOGௐ ௐ1RUWKௐ$PHULFDௐ'RZௐ-RQHVௐ6XVWDLQDELOLW\ௐ,QGH[ௐ
)RUEHVௐ%HVWௐ(PSOR\HUVௐIRUௐGLYHUVLW\ௐௐDQGௐ
ௐ%HVWௐ*OREDOௐ%UDQGVௐ,QWHUEUDQGௐ
7KHௐ:DOOௐ6WUHHWௐ-RXUQDOௐ%HVWௐ0DQDJHGௐ&RPSDQLHVௐLQௐௐDQGௐ 7KHௐ:DOOௐ6WUHHWௐ-RXUQDOௐ:RUOG
Vௐ0RVWௐ6XVWDLQDEO\ௐ0DQDJHGௐ&RPSDQLHVௐ
+XPDQௐ5LJKWVௐ&DPSDLJQௐ)RXQGDWLRQௐ&RUSRUDWHௐ(TXDOLW\ௐ,QGH[ௐ 'RZௐ-RQHVௐ6XVWDLQDELOLW\ௐ,QGH[ௐ
:RUOGௐDQGௐ1RUWKௐ$PHULFD
ௐௐ\HDUVௐ:RUOG¶Vௐ0RVWௐ
6XVWDLQDEO\ௐ0DQDJHGௐ&RPSDQLHVௐ±ௐ7KHௐ:DOOௐ6WUHHWௐ-RXUQDOௐ8QLWHGௐ:D\ௐ:RUOGௐ :LGH¶Vௐ*OREDOௐ&RUSRUDWHௐ/HDGHUVKLSௐ3URJUDPௐ
86ௐ3UHVLGHQW¶Vௐ9ROXQWHHUௐ6HUYLFHௐ$ZDUGௐIURPௐ-XQLRUௐ$FKLHYHPHQWௐ &RUSRUDWHௐ(TXDOLW\ௐ,QGH[ௐ±ௐ+XPDQௐ5LJKWVௐ&DPSDLJQௐ)RXQGDWLRQௐ &65ௐ&KLQDௐ7RSௐௐ±ௐWKHௐWKௐ&65ௐ&KLQDௐ(GXFDWLRQௐ$ZDUGௐ
&KLQD
ௐ&KLQDௐ&65ௐ
([FHOOHQFHௐ$ZDUGௐ±ௐ&KLQDௐ3KLODQWKURS\ௐ7LPHVௐ
&KLQD
ௐௐௐ
&RUSRUDWHௐ6RFLDOௐ5HVSRQVLELOLW\ௐ5HVHDUFKௐ&HQWHUௐRIௐ6RXWKHUQௐ:HHNO\ௐ &KLQD
ௐ
2XWVWDQGLQJௐ&RQWULEXWLRQௐWRௐ3RYHUW\ௐ$OOHYLDWLRQௐ±ௐ&KLQDௐ)RXQGDWLRQௐIRUௐ3RYHUW\ௐ $OOHYLDWLRQௐ
&KLQD
ௐ
ௐ*OREDOௐௐ±ௐ)RUWXQHௐ0DJD]LQHௐ
$PHULFD¶Vௐ0RVWௐ5HVSRQVLEOHௐ&RPSDQLHVௐௐௐ ௐௐ±ௐ1HZVZHHNௐ %HVW0DQDJHGௐ&RPSDQLHVௐRIௐௐ ௐௐ±ௐ7KHௐ:DOOௐ6WUHHWௐ-RXUQDO 7RSௐ&RPSDQLHVௐIRUௐ&XVWRPHUௐ6DWLVIDFWLRQௐ±ௐ7KHௐ:DOOௐ6WUHHWௐ-RXUQDOௐ 7KHௐ&(2ௐ/HDGHUERDUG
ௐ&29,'
ௐ5HSXWDWLRQௐ5DQNLQJVௐ±ௐ6-5ௐ$OO$PHULFDௐ
([HFXWLYHௐ7HDPௐ±ௐ,QVWLWXWLRQDOௐ,QYHVWRUௐ
7RSௐௐ*OREDOௐ/LFHQVRUVௐ±ௐ*OREDOௐ/LFHQVHௐ%HVWௐ*OREDOௐ%UDQGVௐ7RSௐௐ±ௐ ,QWHUEUDQGௐ:RUOG¶Vௐ0RVWௐ9DOXDEOHௐ%UDQGVௐௐ±ௐ)RUEHVௐ
ௐ%HVWௐ3ODFHVௐWRௐ:RUNௐIRUௐ'LVDELOLW\ௐ,QFOXVLRQௐ±ௐ'LVDELOLW\ௐ(TXDOLW\ௐ,QGH[ௐ :RUOG¶Vௐ%HVWௐ(PSOR\HUVௐௐ±ௐ)RUEHV
ௐ%HVWௐ(PSOR\HUVௐIRUௐ:RPHQௐௐ±ௐ)RUEHVௐ
$PHULFD¶Vௐ%HVWௐ(PSOR\HUVௐE\ௐ6WDWHௐௐ±ௐ)RUEHVௐ
$PHULFD
Vௐ%HVWௐ(PSOR\HUVௐIRUௐ'LYHUVLW\ௐௐ±ௐ)RUEHVௐ
%HVWௐ(PSOR\HUVௐIRUௐ1HZௐ*UDGVௐௐ±ௐ)RUEHVௐ
*OREDOௐௐ±ௐ)RUEHVௐௐௐ ௐ
%HVWௐ(PSOR\HUVௐIRUௐ9HWHUDQVௐௐDQGௐ±ௐ)RUEHVௐ
7RSௐ9HWHUDQ)ULHQGO\ௐ&RPSDQ\ௐ±ௐ86ௐ9HWHUDQVௐ0DJD]LQHௐ
ௐ*UHDWௐ3ODFHௐWRௐ:RUNௐ±ௐ*UHDWௐ3ODFHௐWRௐ:RUNௐ,QVWLWXWHௐ %UD]LO

ௐ*UHDWௐ3ODFHௐWRௐ:RUNௐLQௐWKHௐ$Jௐ%XVLQHVVௐௐ*UHDWௐ3ODFHௐWRௐ:RUNௐ,QVWLWXWHௐ %UD]LO
ௐ
&KLOH¶Vௐௐ%HVWௐ3ODFHVௐLQௐௐWRௐ:RUNௐIRUௐ/*%74ௐ(TXDOLW\ௐSZFௐ+XPDQௐ5LJKWVௐ &DPSDLJQௐ
7RSௐRIௐ0LQGௐ&RPSDQ\ௐ³,QGXVWU\ௐFDWHJRU\´ௐ
3LUDFLFDEDௐ%UD]LO
ௐ
&HUWLILFDWLRQௐRQௐ3URPRWLQJௐ:RUN/LIHௐ%DODQFHௐLQௐ+\RJRௐ3UHIHFWXUHௐ±ௐ+\RJRௐ:RUNௐ DQGௐ/LIHௐ&HQWHUௐ
-DSDQ
ௐ
+\RJR¶Vௐ:RPHQ¶Vௐ6XFFHVVௐLQௐ%XVLQHVVௐ3URPRWLRQௐ&RPSDQ\ௐ±ௐ+\RJRௐ:RPHQௐ (PSRZHUPHQWௐ ௐௐ
3URPRWLRQௐ&HQWHUௐ
-DSDQ
ௐ
+DQDGDௐ$ZDUGௐIRUௐ:,1ௐ$NDVKLௐ±ௐ+\RJRௐ:RPHQௐDQGௐ)XWXUHௐ$VVRFLDWLRQௐ -DSDQ
ௐ
+\RJRௐ&KLOGFDUHௐ6XSSRUWLQJௐ&RPSDQ\ௐ$ZDUGௐ
-DSDQ
ௐ
6FLHQFHௐ ௐ7HFKQRORJ\ௐ,QGXVWU\ௐ6XPPLW
ௐ2XWVWDQGLQJௐ&RQWULEXWLRQௐ±ௐ7KHௐ(FRQRPLFௐ
2EVHUYHUௐ
&KLQD
ௐ
ௐ&KLQDௐ*RRGௐ&RPSDQLHV
ௐ,QGXVWU\ௐ/HDGHUVKLSௐ±ௐ-LHPLDQFRPௐ
&KLQD
ௐ
&DWŠௐ*ௐ)DVW5HVSRQVHௐ1DWXUDOௐ*DVௐ*HQHUDWRUௐ6HWௐ(DUQVௐ*ROGௐ$ZDUGௐLQௐ &RQVXOWLQJ6SHFLI\LQJௐ(QJLQHHU¶Vௐௐ3URGXFWௐRIௐWKHௐ<HDUௐ&RPSHWLWLRQ 

 :KDWௐSHUFHQWDJHௐRIௐ\RXUௐVDOHVௐDUHௐWRௐWKHௐ
JRYHUQPHQWDOௐVHFWRUௐLQௐWKHௐSDVWௐWKUHHௐ\HDUV
7KHௐJRYHUQPHQWDOௐDQGௐHGXFDWLRQDOௐVHFWRUௐLVௐH[WUHPHO\ௐLPSRUWDQWௐWRௐ&DWHUSLOODUௐ:Hௐ GRௐQRWௐWUDFNௐJRYHUQPHQWௐDQGௐHGXFDWLRQௐVHSDUDWHO\ௐ+RZHYHUௐLWௐLVௐVDIHௐWRௐDVVXPHௐ WKDWௐWKHௐEXONௐRIௐWKHVHௐVDOHVௐLVௐWRௐVWDWHௐFRXQW\ௐPXQLFLSDOௐDQGௐVSHFLDOௐGLVWULFWVௐ:Hௐ KDYHௐDௐGHGLFDWHGௐWHDPௐWRௐHQVXUHௐVXFFHVVௐLQௐWKLVௐPDUNHWௐ2YHUDOOௐWKHௐSHUFHQWDJHௐRIௐ RXUௐVDOHVௐWRௐQRQIHGHUDOௐJRYHUQPHQWௐDJHQFLHVௐYDULHVௐEHWZHHQௐௐDQGௐ 

Bid Number: RFP 092222 Vendor Name: Caterpillar





  



Redlands Regular Meeting of 09-03-24 1952 of 1977
 :KDWௐSHUFHQWDJHௐRIௐ\RXUௐVDOHVௐDUHௐWRௐWKHௐ
HGXFDWLRQௐVHFWRUௐLQௐWKHௐSDVWௐWKUHHௐ\HDUV
7KHௐJRYHUQPHQWDOௐDQGௐHGXFDWLRQDOௐVHFWRUௐLVௐH[WUHPHO\ௐLPSRUWDQWௐWRௐ&DWHUSLOODUௐ:Hௐ GRௐQRWௐWUDFNௐJRYHUQPHQWௐDQGௐHGXFDWLRQௐVHSDUDWHO\ௐ+RZHYHUௐLWௐLVௐVDIHௐWRௐDVVXPHௐ WKDWௐWKHௐEXONௐRIௐWKHVHௐVDOHVௐLVௐWRௐVWDWHௐFRXQW\ௐPXQLFLSDOௐDQGௐVSHFLDOௐGLVWULFWVௐ:Hௐ KDYHௐDௐGHGLFDWHGௐWHDPௐWRௐHQVXUHௐVXFFHVVௐLQௐWKLVௐPDUNHWௐ2YHUDOOௐWKHௐSHUFHQWDJHௐRIௐ RXUௐVDOHVௐWRௐQRQIHGHUDOௐJRYHUQPHQWௐDJHQFLHVௐYDULHVௐEHWZHHQௐௐDQGௐ 

 /LVWௐDQ\ௐVWDWHௐSURYLQFLDOௐRUௐFRRSHUDWLYHௐ
SXUFKDVLQJௐFRQWUDFWVௐWKDWௐ\RXௐKROGௐ:KDWௐLVௐ
WKHௐDQQXDOௐVDOHVௐYROXPHௐIRUௐHDFKௐRIௐWKHVHௐ
FRQWUDFWVௐRYHUௐWKHௐSDVWௐWKUHHௐ\HDUV"
&DWௐGHDOHUVௐW\SLFDOO\ௐKROGௐFRQWUDFWVௐZLWKௐVWDWHVௐDQGௐSURYLQFHVௐ$GGLWLRQDOO\ௐZHௐDUHௐ FRQWUDFWௐKROGHUVௐZLWKௐ201,$ௐ-XVWௐDVௐZHௐZRXOGௐQHYHUௐVKDUHௐ6RXUFHZHOOௐWUDQVDFWLRQௐ LQIRUPDWLRQௐZLWKௐRWKHUௐFRRSHUDWLYHVௐZHௐIHHOௐLWௐLVௐLQDSSURSULDWHௐWRௐVKDUHௐYROXPHVௐ ZLWKௐWKRVHௐFRQWUDFWV


 /LVWௐDQ\ௐ*6$ௐFRQWUDFWVௐRUௐ6WDQGLQJௐ2IIHUVௐ
DQGௐ6XSSO\ௐ$UUDQJHPHQWVௐ
626$
ௐWKDWௐ\RXௐ
KROGௐ:KDWௐLVௐWKHௐDQQXDOௐVDOHVௐYROXPHௐIRUௐ
HDFKௐRIௐWKHVHௐFRQWUDFWVௐRYHUௐWKHௐSDVWௐWKUHHௐ
\HDUV"
/LVWHGௐEHORZௐDUHௐWKHௐFXUUHQWௐ3RZHUௐ*HQHUDWLRQௐ*6$ௐFRQWUDFWVௐWKDWௐ&DWHUSLOODUௐKROGV ௐ
6,1ௐ

ௐ3RZHUௐ'LVWULEXWLRQௐ(TXLSPHQW
ௐ
 
 
ௐ
ௐ ௐDVௐRIௐWRGD\ௐ
ௐௐ
&RQWUDFWௐ1XPEHU
ௐ*6)5ௐ
)XWXUHௐVDOHVௐZLOOௐEHௐXQGHUௐQHZௐFRQWUDFW
ௐ
*6)8



7DEOH
5HIHUHQFHV7HVWLPRQLDOV
/LQH,WHP6XSSO\UHIHUHQFHLQIRUPDWLRQIURPWKUHHFXVWRPHUVZKRDUHHOLJLEOHWREH6RXUFHZHOOSDUWLFLSDWLQJHQWLWLHV (QWLW\1DPH
&RQWDFW1DPH
3KRQH1XPEHU

&LW\ௐRIௐ2JGHQ 0RQLFDௐ.DSS  

8QLWHGௐ:DWHUௐ&RQVHUYDWLRQௐ'LVWULFW &KULVௐ+HQGULFNV  

5HQHZDEOHௐ:DWHUௐ5HVRXUFHV %UHQWௐ5K\PHU 

 

7DEOH
7RS)LYH*RYHUQPHQWRU(GXFDWLRQ&XVWRPHUV
/LQH,WHP3URYLGHDOLVWRI\RXUWRSILYHJRYHUQPHQWHGXFDWLRQRUQRQSURILWFXVWRPHUV HQWLW\QDPHLVRSWLRQDO
LQFOXGLQJHQWLW\
W\SHWKHVWDWHRUSURYLQFHWKHHQWLW\LVORFDWHGLQVFRSHRIWKHSURMHFW V
VL]HRIWUDQVDFWLRQ
V
DQGGROODUYROXPHVIURPWKHSDVWWKUHH
\HDUV
(QWLW\1DPH (QWLW\7\SH
6WDWH
3URYLQFH
6FRSHRI:RUN
6L]HRI7UDQVDFWLRQV
'ROODU9ROXPH3DVW7KUHH
<HDUV

&LW\ௐRIௐ
&KDUORWWH
*RYHUQPHQW 1RUWK&DUROLQD
1&
$ௐFLW\ௐORFDOௐWRௐ1RUWKௐ&DUROLQD 3XUFKDVHGௐௐXQLWVௐ

VSHFLILFௐWRௐ(3ௐSURGXFWV

 

0DQDWHHௐ
&RXQW\
*RYHUQPHQW )ORULGD)/ $ௐFRXQW\ௐORFDOௐWRௐ)ORULGD 3XUFKDVHGௐ ௐXQLWVௐ

VSHFLILFௐWRௐ(3ௐSURGXFWV




%RQLWDௐ6SULQJVௐ
8WLOLWLHV
*RYHUQPHQW )ORULGD)/ $ௐFLW\ௐORFDOௐWRௐ)ORULGD 3XUFKDVHGௐௐXQLWVௐ

VSHFLILFௐWRௐ(3ௐSURGXFWV

 

8QLYHUVLW\ௐRIௐ
)ORULGD
*RYHUQPHQW )ORULGD)/ &ROOHJHௐLQௐ*DLQHVYLOOHௐ)ORULGD 3XUFKDVHGௐௐXQLWVௐ

VSHFLILFௐWRௐ(3ௐSURGXFWV



 

&LW\ௐRIௐ
5DOHLJKௐ3XEOLFௐ
8WLOLWLHV
*RYHUQPHQW 1RUWK&DUROLQD
1&
:DWHUௐDQGௐVDQLWDU\ௐVHZHUௐVHUYLFHV 3XUFKDVHGௐRQHௐXQLWௐ

VSHFLILFௐWRௐ(3ௐSURGXFWV




7DEOH
$ELOLW\WR6HOODQG'HOLYHU6HUYLFH
'HVFULEH\RXUFRPSDQ\¶VFDSDELOLW\WRPHHWWKHQHHGVRI6RXUFHZHOOSDUWLFLSDWLQJHQWLWLHVDFURVVWKH86DQG&DQDGDDVDSSOLFDEOH <RXUUHVSRQVHVKRXOGDGGUHVVLQGHWDLODWOHDVWWKHIROORZLQJDUHDV ORFDWLRQVRI\RXUQHWZRUNRIVDOHVDQGVHUYLFHSURYLGHUVWKHQXPEHU RIZRUNHUV
IXOOWLPHHTXLYDOHQWV
LQYROYHGLQHDFKVHFWRUZKHWKHUWKHVHZRUNHUVDUH\RXUGLUHFWHPSOR\HHV RUHPSOR\HHVRIDWKLUG
SDUW\
DQGDQ\RYHUODSEHWZHHQWKHVDOHVDQGVHUYLFHIXQFWLRQV /LQH
,WHP 4XHVWLRQ 5HVSRQVH

Bid Number: RFP 092222 Vendor Name: Caterpillar





  



Redlands Regular Meeting of 09-03-24 1953 of 1977
 6DOHVௐIRUFH 7KHௐ&DWௐGHDOHUௐVDOHVIRUFHௐLVௐWKHௐPRVWௐFDSDEOHௐDQGௐKLJKO\ௐWUDLQHGௐLQௐWKHௐLQGXVWU\ௐ7KHௐ &DWௐGHDOHUௐVDOHVSHRSOHௐDUHௐFRQVXOWDQWVௐWRௐWKHLUௐFXVWRPHUVௐDQGௐDGYLVHௐWKHLUௐFXVWRPHUVௐ RQௐWKHௐEHVWௐVROXWLRQVௐIRUௐWKHLUௐDSSOLFDWLRQௐDQGௐMREௐ$VௐDௐPDQXIDFWXUHUௐZHௐUHTXHVWௐRXUௐ GHDOHUVௐWRௐIROORZௐVWULFWௐWUDLQLQJௐSURWRFROVௐWRௐHQVXUHௐRXUௐVDOHVௐIRUFHௐUHPDLQVௐFXUUHQWௐRQௐ DOOௐSURGXFWௐXSGDWHVௐ6SHFLILFDOO\ௐDVௐLWௐUHODWHVௐWRௐJRYHUQPHQWDOௐVDOHVௐHDFKௐGHDOHUௐKDVௐ RQHௐRUௐPRUHௐSHRSOHௐQDPHGௐWRௐEHௐDௐNH\ௐOLDLVRQௐEHWZHHQௐXVௐDVௐPDQXIDFWXUHUௐDQGௐ WKHLUௐGHDOHUௐVDOHVௐWHDPௐ7KLVௐSHUVRQௐLVௐRIIHUHGௐDGGLWLRQDOௐLQGHSWKௐWUDLQLQJௐRQௐ 6RXUFHZHOOௐDQGௐHQVXUHVௐWKDWௐDOOௐFRQWUDFWௐWHUPVௐDUHௐIROORZHGௐ,QௐDGGLWLRQௐGHDOHUVௐDOVRௐ KDYHௐHOHFWULFௐSRZHUௐVSHFLDOLVWVௐORFDWHGௐLQௐKRXVHௐWRௐZRUNௐZLWKௐFXVWRPHUVௐRQௐDOOௐ DVSHFWVௐRIௐWKHLUௐSRZHUௐJHQHUDWLRQௐEXVLQHVVௐ
,Qௐ1RUWKௐ$PHULFDௐRXUௐGHDOHUVௐHPSOR\ௐPRUHௐWKDQௐௐSHRSOHௐDFURVVௐWKHௐPDFKLQHௐ HQHUJ\ௐSDUWVௐDQGௐVHUYLFHௐGLYLVLRQVௐ7KHௐGHDOHUௐVDOHVௐWHDPVௐDUHௐVXSSRUWHGௐE\ௐDௐ QHWZRUNௐRIௐ&DWHUSLOODUௐSURIHVVLRQDOVௐ(DFKௐGHDOHUௐKDVௐLQௐWHUULWRU\ௐVXSSRUWௐRIௐௐ &DWHUSLOODUௐVDOHVPDUNHWLQJௐHPSOR\HHVௐ,WௐLVௐWKHௐUHVSRQVLELOLW\ௐRIௐWKHVHௐSHRSOHௐWRௐ HQVXUHௐWKDWௐWKHௐGHDOHUௐDQGௐ&DWHUSLOODUௐDUHௐZRUNLQJௐZHOOௐWRJHWKHUௐWRௐFRQVWDQWO\ௐLPSURYHௐ DQGௐWRௐDGDSWௐWRௐPDUNHWSODFHௐFKDQJHVௐ%H\RQGௐWKHௐWHUULWRU\ௐH[SHUWVௐWKHௐVDOHVௐDQGௐ PDUNHWLQJௐGHSDUWPHQWௐDWௐ&DWHUSLOODUௐLVௐVWDIIHGௐE\ௐPRUHௐWKDQௐௐSHRSOHௐZKRVHௐ PLVVLRQௐLVௐWRௐIRFXVௐRQௐFXVWRPHUௐVDWLVIDFWLRQௐ(YHQௐPRUHௐDUHௐHPSOR\HGௐEHKLQGWKH VFHQHVௐWRௐHQVXUHௐLQGXVWU\ௐOHDGLQJௐSURGXFWௐGHVLJQௐXSௐWRௐGDWHௐSURGXFWௐLQIRUPDWLRQௐ DQGௐPDLQWDLQLQJௐWKHௐHDVHௐRIௐGRLQJௐEXVLQHVVௐLQௐDQௐLQFUHDVLQJO\ௐFRQQHFWHGௐPDUNHWSODFH 

 'HDOHUௐQHWZRUNௐRUௐRWKHUௐGLVWULEXWLRQௐ
PHWKRGV
7KHௐ&DWௐGHDOHUௐQHWZRUNௐLVௐNH\ௐWRௐWKHௐVXFFHVVௐRIௐRXUௐFRPSDQ\ௐ:LWKLQௐ&DQDGDௐDQGௐ WKHௐ8QLWHGௐ6WDWHVௐZHௐKDYHௐPRUHௐWKDQௐௐGHDOHUௐRZQHGௐORFDWLRQVௐWKDWௐVHOOௐDQGௐUHQWௐ HTXLSPHQWௐ3OHDVHௐUHIHUௐWRௐRXUௐGLUHFWRU\ௐOLVWLQJௐRIௐ&DWௐGHDOHUௐORFDWLRQVௐDQGௐORFDWLRQVௐ PDSௐLQௐWKHௐDWWDFKHGௐ³&DWௐ'HDOHUௐ'LUHFWRU\´ௐ&DWௐGHDOHUVௐDUHௐLQGHSHQGHQWO\ௐRZQHGௐ DQGௐPDQ\ௐFRYHUௐDQௐHQWLUHௐVWDWHௐRUௐSURYLQFHௐ,QௐVRPHௐFDVHVௐGHDOHUVௐFURVVௐ VWDWHSURYLQFLDOௐERXQGDULHVௐDQGௐLQௐRWKHUௐFDVHVௐPRUHௐWKDQௐRQHௐGHDOHUௐZLOOௐEHௐORFDWHGௐ LQௐDௐVWDWH
ௐ(DFKௐGHDOHUௐKDVௐPXOWLSOHௐEUDQFKHVௐDQGௐDௐPRELOHௐVHUYLFHௐIOHHWௐWKDWௐFDQௐ VHUYHௐFXVWRPHUVௐUHJDUGOHVVௐRIௐORFDWLRQௐ7KHVHௐDUHௐIXOOௐSK\VLFDOௐORFDWLRQVௐRXUௐ JRYHUQPHQWDOௐFXVWRPHUVௐFDQௐXVHௐ
%HFDXVHௐRIௐWKHௐVL]HௐRIௐ&DWௐGHDOHUVௐWKH\ௐDUHௐH[FHSWLRQDOO\ௐFDSDEOHௐWRௐVHUYHௐ JRYHUQPHQWDOௐFXVWRPHUVௐDQGௐFXVWRPHUVௐLQௐWKHௐJRYHUQPHQWDOௐLQGXVWU\ௐ'HDOHUVௐKDYHௐ WUDLQHGௐVSHFLDOLVWVௐWKDWௐFRYHUௐPDQ\ௐLQGXVWULHVௐ0DQ\ௐRIௐRXUௐGHDOHUௐVDOHVௐUHSVௐVHOOௐ PRUHௐWKDQௐௐRIௐWKHLUௐVDOHVௐWKURXJKௐ6RXUFHZHOOௐ7RௐVXSSRUWௐWKHVHௐGHDOHUVௐDQGௐ VSHFLDOLVWVௐLQௐWKHௐILHOGௐ&DWHUSLOODUௐKDVௐDQௐHOHFWULFௐSRZHUௐGLYLVLRQௐZLWKௐௐGHGLFDWHGௐ HOHFWULFௐSRZHUௐWHUULWRU\ௐPDQDJHUVௐGHGLFDWHGௐWRௐWUDLQLQJௐDQGௐIRFXVHGௐRQௐWKHௐHOHFWULFௐ SRZHUௐLQGXVWU\ௐ7RௐKHOSௐZLWKௐ6RXUFHZHOOௐVDOHVௐZHௐKDYHௐDௐGHGLFDWHGௐVDOHVௐUHSௐ1LFROHௐ :DUQVWHGWௐZKRௐLVௐH[SHUWௐRQௐFRRSHUDWLYHௐSXUFKDVLQJௐIRUௐWKHௐSRZHUௐJHQHUDWLRQௐJURXSௐ DVௐZHOOௐDVௐDQௐLQWHUQௐWRௐDVVLVWௐZLWKௐGD\ௐWRௐGD\ௐWDVNVௐ&DWHUSLOODUௐDOVRௐSXOOVௐWRJHWKHUௐ WKHௐHOHFWULFௐSRZHUௐVSHFLDOLVWVௐLQWRௐDௐ'HDOHUௐ$GYLVRU\ௐJURXSௐWRௐKDYHௐDௐFRQWLQXRXVௐ IHHGEDFNௐORRSௐRQௐLQGXVWU\ௐWUHQGVௐDQGௐWRௐFROODERUDWHௐRQௐIXWXUHௐQHZௐSURGXFWௐ LQWURGXFWLRQVௐௐ
&ROOHFWLYHO\ௐ&DWௐGHDOHUV
ௐODUJHௐQHWௐZRUWKௐSHUPLWVௐWKHPௐWRௐVWRFNௐDௐKLJKௐYROXPHௐRIௐௐ UHSODFHPHQWௐSDUWVௐௐDOORZLQJௐJRYHUQPHQWDOௐFXVWRPHUVௐWKHௐIDVWHVWௐWXUQDURXQGௐRQௐSDUWVௐ DYDLODELOLW\ௐDQGௐUHSDLUௐWLPHௐ&DWௐGHDOHUVௐUHFRJQL]HௐWKHௐLPSRUWDQFHௐRIௐJRYHUQPHQWDOௐ EXVLQHVVௐWRௐWKHLUௐRYHUDOOௐVXFFHVVௐDQGௐWKHLUௐSURGXFWௐVXSSRUWௐVDOHVௐUHSVௐDUHௐZHOOௐ YHUVHGௐLQௐZRUNLQJௐZLWKௐJRYHUQPHQWௐHQWLWLHVௐ
3OHDVHௐUHIHUௐWRௐWKHௐ&DWௐGHDOHUௐORFDWLRQVௐOLVWௐDQGௐPDSௐLQFOXGHGௐLQௐ$GGLWLRQDOௐ 'RFXPHQWV


Bid Number: RFP 092222 Vendor Name: Caterpillar





  



Redlands Regular Meeting of 09-03-24 1954 of 1977
 6HUYLFHௐIRUFH $Wௐ&DWHUSLOODUௐZHௐDUHௐYHU\ௐSURXGௐRIௐWKHௐVD\LQJௐ7KHௐVDOHVௐGHSDUWPHQWௐVHOOVௐWKHௐILUVWௐ

PDFKLQH
ௐWKHௐVHUYLFHௐGHSDUWPHQWௐVHOOVௐHYHU\ௐRQHௐDIWHUௐWKDWௐ7KHௐ&DWௐGHDOHUௐQHWZRUNௐ LQௐ1RUWKௐ$PHULFDௐFROOHFWLYHO\ௐHPSOR\VௐPRUHௐWKDQௐௐIDFWRU\ௐWUDLQHGௐWHFKQLFLDQVௐ SDUWVௐH[SHUWVௐSURGXFWௐVXSSRUWௐPDQDJHUVௐDQGௐRWKHUௐVHUYLFHRULHQWHGௐVWDIIௐ7KHVHௐ SHRSOHௐDUHௐVXSSRUWHGௐE\ௐWKHௐEHVWௐUHSDLUௐVKRSௐHTXLSPHQWௐDQGௐPDWHULDOVௐ$VௐPDFKLQHVௐ DQGௐHQJLQHVௐDUHௐFRQVWDQWO\ௐXSGDWHGௐVRௐWRRௐDUHௐRXUௐVHUYLFHௐH[SHUWVௐ:HௐFRQGXFWௐ SURGXFWVSHFLILFௐWUDLQLQJௐHYHU\ௐZHHNௐRIௐWKHௐ\HDUௐ7HFKQLFLDQௐVKRUWDJHௐLVௐDQௐLQGXVWU\ ZLGH
FRQFHUQௐEXWௐEHFDXVHௐ&DWௐGHDOHUVௐDUHௐODUJHௐORQJௐHVWDEOLVKHGௐFRPSDQLHVௐWKH\ௐFDQௐ RIIHUௐVWURQJௐFRPSHQVDWLRQௐDQGௐEHQHILWௐSDFNDJHVௐWKDWௐHQFRXUDJHௐWKHௐEHVWௐSHRSOHௐWRௐ VHHNௐHPSOR\PHQWௐDQGௐWRௐUHWDLQௐWKHPௐRQFHௐKLUHGௐ&DWHUSLOODUௐZRUNVௐYHU\ௐFORVHO\ௐZLWKௐ GHDOHUVௐDQGௐWKURXJKௐDௐSURJUDPௐFDOOHGௐ7KLQNௐ%LJௐZHௐDUHௐDEOHௐWRௐNHHSௐWKHௐSLSHOLQHௐ RIௐKLJKௐTXDOLW\ௐHPSOR\HHVௐIXOOௐ
,QௐDGGLWLRQௐWRௐWKHௐWHFKQLFLDQVௐDQGௐPHFKDQLFVௐWKDWௐZRUNௐRQௐWKHௐJHQHUDWRUVௐGLUHFWO\ௐ HDFKௐGHDOHUௐKDVௐDௐVHUYLFHௐVXSSRUWௐVWDIIௐWKDWௐLQFOXGHVௐFXVWRPHUIDFLQJௐFRQVXOWDQWVௐZKRௐ DUHௐUHVSRQVLEOHௐIRUௐZRUNLQJௐZLWKௐFXVWRPHUVௐWRௐVHWௐXSௐPDLQWHQDQFHௐDQGௐUHSDLUௐ VFKHGXOHVௐWRௐHQVXUHௐWKHௐEHVWௐSRVVLEOHௐXSWLPHௐ&ROOHFWLYHO\ௐVHUYLFHௐVXSSRUWௐVWDIIௐ PDNHVௐXSௐWKHௐEXONௐRIௐHDFKௐGHDOHUV
ௐVWDIIௐ5RXJKO\ௐKDOIௐRIௐWKHLUௐSHUVRQQHOௐLQYHVWPHQWௐ
JRHVௐWRௐHQVXULQJௐFXVWRPHUௐVXFFHVVௐYLDௐSURGXFWௐVXSSRUWௐ 7KHௐGHDOHUௐVHUYLFHௐWHDPVௐDUHௐVXSSRUWHGௐE\ௐDௐQHWZRUNௐRIௐ&DWHUSLOODUௐSURIHVVLRQDOVௐ (DFKௐGHDOHUௐKDVௐLQௐWHUULWRU\ௐVXSSRUWௐRIௐௐ&DWHUSLOODUௐSDUWVVHUYLFHௐHPSOR\HHVௐ,WௐLVௐ WKHௐUHVSRQVLELOLW\ௐRIௐWKHVHௐSHRSOHௐWRௐHQVXUHௐWKDWௐWKHௐGHDOHUௐDQGௐ&DWHUSLOODUௐDUHௐ ZRUNLQJௐZHOOௐWRJHWKHUௐWRௐFRQVWDQWO\ௐLPSURYHௐDQGௐWRௐDGDSWௐWRௐPDUNHWSODFHௐFKDQJHVௐ %H\RQGௐWKHௐWHUULWRU\ௐH[SHUWVௐWKHௐVHUYLFHௐDQGௐVXSSRUWௐJURXSVௐDWௐ&DWHUSLOODUௐDUHௐVWDIIHGௐ E\ௐWKRXVDQGVௐRIௐSHRSOHௐZKRVHௐPLVVLRQௐLVௐWRௐIRFXVௐRQௐSRVWVDOHௐFXVWRPHUௐVDWLVIDFWLRQௐ (YHQௐPRUHௐDUHௐHPSOR\HGௐEHKLQGWKHVFHQHVௐWRௐHQVXUHௐWHFKQLFDOௐOLWHUDWXUHௐLVௐXSௐWRௐ GDWHௐVHUYLFHௐVWDQGDUGVௐDUHௐDGKHUHௐWRௐDQGௐUHSDLUௐTXHVWLRQVௐDUHௐDQVZHUHGௐTXLFNO\ௐ +LVWRULFDOO\ௐZHௐKDYHௐH[FHHGHGௐRXUௐ
ௐKRXUௐUHVSRQVHௐUDWHௐWDUJHWௐLQௐUHVSRQGLQJௐWRௐ
GHDOHUௐVHUYLFHௐLQTXLULHV



'HVFULEHௐWKHௐRUGHULQJௐSURFHVVௐ,IௐRUGHUVௐ
ZLOOௐEHௐKDQGOHGௐE\ௐGLVWULEXWRUVௐGHDOHUVௐRUௐ
RWKHUVௐH[SODLQௐWKHௐUHVSHFWLYHௐUROHVௐRIௐWKHௐ
3URSRVHUௐDQGௐRWKHUV
2XUௐVLPSOHௐRUGHUௐSURFHVVௐKDVௐEHHQௐDQGௐZLOOௐFRQWLQXHௐWRௐEHௐZHOOௐDSSUHFLDWHGௐE\ௐ 6RXUFHZHOOௐDQGௐ6RXUFHZHOOௐPHPEHUV
ௐ

ௐௐ:KHQௐDௐPHPEHUௐGHFLGHVௐWRௐSXUFKDVHௐDௐQHZௐ&DWௐ*HQHUDWRUௐWKH\ௐLQFOXGHௐWKHௐ FRQWUDFWௐQXPEHUௐDQGௐWKHLUௐ6RXUFHZHOOௐPHPEHUௐQXPEHUௐRQௐWKHௐ3XUFKDVHௐ2UGHUௐWKH\ௐ LVVXHௐWRௐWKHௐ&DWௐGHDOHUௐ

ௐௐ7KHௐ&DWௐGHDOHUௐWKHQௐDFFHSWVௐWKHௐ32ௐLVVXHVௐWKHௐLQYRLFHௐDFFHSWVௐSD\PHQWௐDQGௐ GHOLYHUVௐWKHௐJHQHUDWRUௐ

ௐௐ$IWHUௐWKHௐJHQHUDWRUௐKDVௐEHHQௐGHOLYHUHGௐWKHௐGHDOHUௐDVௐSDUWௐRIௐWKHLUௐQRUPDOௐ SURFHVVௐLQFOXGHVௐWKHௐPHPEHUௐQXPEHUௐZKHQௐILOLQJௐWKHLUௐVDOHVௐFODLPVௐZLWKௐ&DWHUSLOODUௐ 
ௐௐ$WௐPRQWKௐHQGௐ&DWHUSLOODUௐDJJUHJDWHVௐWKHVHௐUHSRUWVௐDQGௐVHQGVௐWKHௐVDOHVௐ LQIRUPDWLRQௐTXDUWHUO\ௐWRௐ6RXUFHZHOOௐDORQJௐZLWKௐWKHௐDGPLQLVWUDWLYHௐIHHௐ ,03257$17ௐ127(
ௐௐ6KRXOGௐDௐPHPEHUௐZLVKௐWRௐLQFOXGHௐDGGLWLRQDOௐWHUPVௐDQGௐ FRQGLWLRQVௐWRௐWKLVௐFRQWUDFWௐRUௐWRௐRWKHUZLVHௐUHTXHVWௐDௐ3DUWLFLSDWLQJௐ$GGHQGXPௐWKDWௐ DJUHHPHQWௐௐ3$ௐVKRXOGௐEHௐH[HFXWHGௐEHWZHHQௐௐ
WKHௐPHPEHUௐDQGௐ&DWௐGHDOHUௐGLUHFWO\


Bid Number: RFP 092222 Vendor Name: Caterpillar





  



Redlands Regular Meeting of 09-03-24 1955 of 1977
 'HVFULEHௐLQௐGHWDLOௐWKHௐSURFHVVௐDQGௐ
SURFHGXUHௐRIௐ\RXUௐFXVWRPHUௐVHUYLFHௐ
SURJUDPௐLIௐDSSOLFDEOHௐௐ,QFOXGHௐ\RXUௐ
UHVSRQVHWLPHௐFDSDELOLWLHVௐDQGௐ
FRPPLWPHQWVௐDVௐZHOOௐDVௐDQ\ௐLQFHQWLYHVௐ
WKDWௐKHOSௐ\RXUௐSURYLGHUVௐPHHWௐ\RXUௐVWDWHGௐ
VHUYLFHௐJRDOVௐRUௐSURPLVHV
:HௐDUHௐSURXGௐWKDWௐRXUௐUHSXWDWLRQௐVWDQGVௐRQௐKDYLQJௐWKHௐEHVWௐFXVWRPHUௐVXSSRUWௐLQௐWKHௐ LQGXVWU\ௐ,QௐIDFWௐRXUௐFDSDELOLWLHVௐDUHௐLQGXVWU\ௐOHDGLQJௐ6KRXOGௐDௐFXVWRPHUௐHYHUௐKDYHௐDௐ SUREOHPௐRUௐLVVXHௐZLWKௐDௐJHQHUDWRUௐWKHLUௐ&DWௐGHDOHUௐLVௐHPSRZHUHGௐWRௐUHVROYHௐWKDWௐ LVVXHௐORFDOO\ௐ,IௐWKHௐSUREOHPௐLVௐDௐUHVXOWௐRIௐDௐGHIHFWௐLQௐPDWHULDOௐRUௐZRUNPDQVKLSௐ &DWHUSLOODUௐKDVௐDௐVWDQGDUGௐZDUUDQW\ௐWRௐDGGUHVVௐ(YHU\ௐ&DWௐGHDOHUௐKDVௐDௐFRPPRQௐ GHWDLOHGௐVHUYLFHௐSURFHVVௐLQௐSODFHௐ&DWHUSLOODUௐVXSSRUWVௐDQGௐYHULILHVௐWKDWௐDOOௐWKHௐGHDOHUௐ VHUYLFHௐWHFKQLFLDQVௐDUHௐVXSSOLHGௐZLWKௐWKHௐWRROVௐDQGௐHTXLSPHQWௐQHHGHGௐWRௐUHSDLUௐDOOௐ &DWௐSURGXFWVௐ
:LWKௐDQௐDEXQGDQFHௐRIௐ&DWHUSLOODUௐ1HWZRUNௐVHUYLFHௐORFDWLRQVௐ RYHUௐௐORFDWLRQV
ௐ
LQFOXGLQJௐDQௐHVWLPDWHGௐVDOHVௐDQGௐVHUYLFHௐWHDPௐRIௐௐௐVHUYLFHௐED\VௐDQGௐ ௐILHOGௐVHUYLFHௐWUXFNVௐRXUௐKLJKO\ௐVNLOOHGWUDLQHGௐ&DWHUSLOODUௐGHDOHUௐWHFKQLFLDQVௐDUHௐ LQௐFORVHௐSUR[LPLW\ௐWRௐ6RXUFHZHOOௐFXVWRPHUVௐZLWKLQௐWKHௐ86ௐDQGௐ&DQDGDௐ7KHௐ&DWHUSLOODUௐ QHWZRUNௐSURYLGHVௐXQPDWFKHGௐVHUYLFHௐFDSDELOLWLHVௐWRௐPHHWௐFXVWRPHUௐVHUYLFLQJௐ UHTXLUHPHQWV
7HFKQLFLDQVௐKDYHௐDFFHVVௐWRௐDQௐHOHFWURQLFௐOLEUDU\ௐRIௐWHFKQLFDOௐLQIRUPDWLRQௐLQFOXGLQJௐ 6HUYLFHௐ/HWWHUVௐ7HFKQLFDOௐ,QIRUPDWLRQௐ%XOOHWLQVௐ6\VWHPௐ2SHUDWLRQVௐ7URXEOHVKRRWLQJௐ DQGௐ'LVDVVHPEO\ௐDQGௐ$VVHPEO\ௐPDQXDOVௐ7KHVHௐPDQXDOVௐDUHௐSURYLGHGௐIRUௐHYHU\ௐ&DWௐ SURGXFWௐௐ(DFKௐGHDOHUௐDOVRௐKDVௐRQHௐRUௐPRUHௐ7HFKQLFDOௐ&RPPXQLFDWRUVௐZKRௐDUHௐ GHGLFDWHGௐWRௐVXSSRUWLQJௐWKHௐVHUYLFHௐWHFKQLFLDQVௐE\ௐDFWLQJௐDVௐDௐOLDLVRQௐEHWZHHQௐWKHௐ VKRSௐSHUVRQQHOௐDQGௐ&DWHUSLOODUௐ
7KHௐVHUYLFHௐWHFKQLFLDQVௐDOVRௐKDYHௐDௐGHDOHUௐVXSSRUWௐQHWZRUNௐ '61
ௐV\VWHPௐZLWKௐGLUHFWௐ
DFFHVVௐWRௐ&DWHUSLOODU
Vௐ6HUYLFHௐ(QJLQHHUVௐ&DWHUSLOODUௐUHVSRQGVௐWRௐPRUHௐWKDQௐ ௐRIௐ
DOOௐKLJKௐSULRULW\ௐWLFNHWVௐZLWKLQௐRQHௐKRXUௐ
'HSHQGLQJௐRQௐDௐFXVWRPHU
VௐQHHGVௐWKH\ௐPD\ௐFKRRVHௐWRௐKDQGOHௐVHUYLFHௐLVVXHVௐ
WKHPVHOYHVௐLQௐFRQMXQFWLRQௐZLWKௐWKHLUௐGHDOHUௐRUௐWKH\ௐPD\ௐDVNௐWKHLUௐGHDOHUௐWRௐKDQGOHௐ WKHPௐHQWLUHO\ௐ7RௐPHHWௐWKHௐYDU\LQJௐGHVLUHVௐRIௐHDFKௐFXVWRPHUௐ&DWHUSLOODUௐRIIHUVௐDௐZLGHௐ UDQJHௐRIௐVHUYLFHௐSURJUDPV
ௐ
&DWௐ,QVSHFWௐ
&RQGLWLRQௐ0RQLWRULQJௐ
&XVWRPHUௐ6XSSRUWௐ$JUHHPHQWVௐ
626ௐ6HUYLFHVௐ
IOXLGௐDQDO\VLV



 'HVFULEHௐ\RXUௐDELOLW\ௐDQGௐZLOOLQJQHVVௐWRௐ
SURYLGHௐ\RXUௐSURGXFWVௐDQGௐVHUYLFHVௐWRௐ
6RXUFHZHOOௐSDUWLFLSDWLQJௐHQWLWLHVௐLQௐWKHௐ
8QLWHGௐ6WDWHV
:HௐDUHௐKDSS\ௐWRௐVHUYHௐDOOௐJHRJUDSKLFௐDUHDVௐDQGௐDOOௐ6RXUFHZHOOௐPHPEHUௐVHFWRUVௐZLWKௐ LQௐWKHௐ8QLWHGௐ6WDWHVௐZLWKௐRXUௐFRPSOHWHௐSURGXFWௐDQGௐVHUYLFHௐRIIHULQJVௐ&DWHUSLOODUௐKDVௐ VXFFHVVIXOO\ௐXWLOL]HGௐ6RXUFHZHOOௐௐWRௐVHOOௐJHQHUDWRUVௐLQௐDOOௐVWDWHV 

 'HVFULEHௐ\RXUௐDELOLW\ௐDQGௐZLOOLQJQHVVௐWRௐ
SURYLGHௐ\RXUௐSURGXFWVௐDQGௐVHUYLFHVௐWRௐ
6RXUFHZHOOௐSDUWLFLSDWLQJௐHQWLWLHVௐLQௐ&DQDGD
:HௐDUHௐKDSS\ௐWRௐVHUYHௐDOOௐJHRJUDSKLFௐDUHDVௐDQGௐDOOௐ6RXUFHZHOOௐPHPEHUௐVHFWRUVௐ ZLWKLQௐ&DQDGDௐZLWKௐRXUௐFRPSOHWHௐSURGXFWௐDQGௐVHUYLFHௐRIIHULQJVௐ,QௐIDFWௐZHௐVHHௐWKHௐ &DQDGLDQௐPDUNHWௐDVௐDௐVLJQLILFDQWௐJURZWKௐRSSRUWXQLW\ௐIRUௐ6RXUFHZHOOௐXVHௐDQGௐDUHௐ DFWLYHO\ௐHQFRXUDJLQJௐLWVௐXVHௐ&DWHUSLOODUௐFXUUHQWO\ௐKDVௐ&DQDGDௐ6RXUFHZHOOௐJURZWKௐLQௐ RXUௐ&DQDGDௐ'HDOHU¶Vௐௐ*URZWKௐ3ODQVௐ:HௐKDYHௐJDLQHGௐPRPHQWXPௐZLWKௐRXUௐ FXUUHQWௐFRQWUDFWௐ&$7ௐLQௐ&DQDGD


 ,GHQWLI\ௐDQ\ௐJHRJUDSKLFௐDUHDVௐRIௐWKHௐ8QLWHGௐ
6WDWHVௐRUௐ&DQDGDௐWKDWௐ\RXௐZLOOௐ127ௐEHௐ
IXOO\ௐVHUYLQJௐWKURXJKௐWKHௐSURSRVHGௐFRQWUDFW
:HௐDUHௐKDSS\ௐWRௐVHUYHௐDOOௐJHRJUDSKLFௐDUHDVௐRIௐWKHௐ8QLWHGௐ6WDWHVௐDQGௐ&DQDGD 

 ,GHQWLI\ௐDQ\ௐ6RXUFHZHOOௐSDUWLFLSDWLQJௐHQWLW\ௐ
VHFWRUVௐ
LHௐJRYHUQPHQWௐHGXFDWLRQௐQRWIRU
SURILW
ௐWKDWௐ\RXௐZLOOௐ127ௐEHௐIXOO\ௐVHUYLQJௐ
WKURXJKௐWKHௐSURSRVHGௐFRQWUDFWௐ([SODLQௐLQௐ
GHWDLOௐ)RUௐH[DPSOHௐGRHVௐ\RXUௐFRPSDQ\ௐ
KDYHௐRQO\ௐDௐUHJLRQDOௐSUHVHQFHௐRUௐGRௐRWKHUௐ
FRRSHUDWLYHௐSXUFKDVLQJௐFRQWUDFWVௐOLPLWௐ\RXUௐ
DELOLW\ௐWRௐSURPRWHௐDQRWKHUௐFRQWUDFW"
:HௐDUHௐKDSS\ௐWRௐVHUYHௐDOOௐ6RXUFHZHOOௐ0HPEHUௐVHFWRUVௐZLWKLQௐWKHௐ8QLWHGௐ6WDWHVௐDQGௐ &DQDGDௐZLWKௐRXUௐFRPSOHWHௐSURGXFWௐDQGௐVHUYLFHௐRIIHULQJௐWKURXJKௐ6RXUFHZHOOௐ &DWHUSLOODU
VௐFRRSHUDWLYHௐSXUFKDVLQJௐFRQWUDFWVௐDUHௐQRQH[FOXVLYH
ௐLHௐQRQHௐRIௐWKHPௐ
UHVWULFWௐ&DWHUSLOODUௐIURPௐSURPRWLQJௐDQ\ௐRWKHUௐFRRSHUDWLYHௐSXUFKDVLQJௐFRQWUDFWV 

 'HILQHௐDQ\ௐVSHFLILFௐFRQWUDFWௐUHTXLUHPHQWVௐ
RUௐUHVWULFWLRQVௐWKDWௐZRXOGௐDSSO\ௐWRௐRXUௐ
SDUWLFLSDWLQJௐHQWLWLHVௐLQௐ+DZDLLௐDQGௐ$ODVNDௐ
DQGௐLQௐ86ௐ7HUULWRULHV
7KHUHௐDUHௐQRௐUHVWULFWLRQVௐRUௐOLPLWDWLRQVௐIRUௐVDOHVௐWRௐPHPEHUVௐLQௐ+DZDLLௐ$ODVNDௐRUௐ 86ௐ7HUULWRULHV 

7DEOH
0DUNHWLQJ3ODQ
/LQH
,WHP 4XHVWLRQ 5HVSRQVH

Bid Number: RFP 092222 Vendor Name: Caterpillar





  



Redlands Regular Meeting of 09-03-24 1956 of 1977
 'HVFULEHௐ\RXUௐPDUNHWLQJௐVWUDWHJ\ௐIRUௐ
SURPRWLQJௐWKLVௐFRQWUDFWௐRSSRUWXQLW\ௐௐ
8SORDGௐUHSUHVHQWDWLYHௐVDPSOHVௐRIௐ\RXUௐ
PDUNHWLQJௐPDWHULDOVௐ
LIௐDSSOLFDEOH
ௐLQௐ
WKHௐGRFXPHQWௐXSORDGௐVHFWLRQௐRIௐ\RXUௐ
UHVSRQVH
&DWHUSLOODUௐLVௐFRPPLWWHGௐWRௐFRRSHUDWLQJௐZLWKௐ6RXUFHZHOOௐWRௐIXOO\ௐDQGௐFRQWLQXDOO\ௐWUDLQௐRXUௐ ௐPDQDJHPHQWௐDQGௐVDOHVௐVWDIIௐZLWKLQௐWKHௐGHDOHUௐQHWZRUNௐWRௐHQVXUHௐPD[LPXPௐ DZDUHQHVVௐDQGௐHPEUDFHPHQWௐRIௐRXUௐ6RXUFHZHOOௐFRQWUDFWௐ7RௐVKRZௐRXUௐFRPPLWPHQWௐZHௐ KDYHௐHQJDJHGௐWRௐGHSOR\ௐWKHௐSURYHQௐDELOLW\ௐRIௐWKHௐ*RYHUQPHQWௐ6ROXWLRQVௐ7HDPௐ//&ௐ *67
ௐ
RIௐ/HEDQRQௐ7HQQHVVHHௐWRௐWUDLQௐDQGௐIXUWKHUௐVXSSRUWௐRXUௐVDOHVௐPDQDJHPHQWௐDQGௐGHDOHUௐ QHWZRUNௐLQௐWKHௐHYHQWௐRIௐDௐFRQWUDFWௐDZDUGௐLQௐWKLVௐ5)3ௐSURFHVVௐ*67¶VௐH[WHQVLYHௐNQRZOHGJHௐ DQGௐXQGHUVWDQGLQJௐRIௐWKHௐ6RXUFHZHOOௐVWDWXHVௐKLVWRU\ௐDQGௐSURFHVVHVௐZLOOௐEHௐRXUௐFRQWLQXDOௐ SULRULW\ௐLQௐWKHௐVXSSRUWௐDQGௐHGXFDWLRQௐRIௐRXUௐGLVWULEXWLRQௐFKDQQHOௐ*67ௐEXLOGVௐ6RXUFHZHOOௐ DZDUHQHVVௐDQGௐHQWKXVLDVPௐZLWKLQௐRXUௐGHDOHUௐQHWZRUNௐ&RQVLVWHQWௐUHPRWHௐDQGௐRQVLWHௐ GHDOHUௐWUDLQLQJௐDWௐUHJLRQDOௐDQGௐQDWLRQDOௐGHDOHUௐPHHWLQJVௐZLOOௐFRQWLQXHௐWRௐOHDGௐWRௐH[HPSODU\ௐ VDOHVௐJURZWKௐRIௐRXUௐSURSRVHGௐ6RXUFHZHOOௐFRQWUDFWௐ*67ௐDOVRௐVWDIIVௐDௐ'HDOHUௐ6XSSRUWௐ 6SHFLDOLVWௐZKRௐLVௐGHGLFDWHGௐWRௐDVVLVWLQJௐVDOHVௐUHSVௐZLWKௐWKHLUௐTXHVWLRQVௐDQGௐQHHGVௐ &DWHUSLOODUௐLVௐDOVRௐOLVWHGௐDVௐDௐVWUDWHJLFௐVXSSOLHUௐSDUWQHUௐIRUௐ1DWLRQDOௐ&RRSHUDWLYHௐ 3XUFKDVLQJௐ3DUWQHUVௐ
1&33
ௐWKHௐSURIHVVLRQDOௐDVVRFLDWLRQௐIRUௐFRRSHUDWLYHௐSURFXUHPHQWௐௐ 'RFXPHQWDWLRQௐDQGௐWUDLQLQJௐUHJDUGLQJௐ6RXUFHZHOOௐSURMHFWVௐDUHௐDYDLODEOHௐRQௐRXUௐLQWHUQDOௐ GHDOHUௐZHEVLWHௐ&DWHUSLOODUௐDOVRௐGRHVௐRQVLWHௐDQGௐYLUWXDOௐWUDLQLQJௐIRUௐGHDOHUVௐWRௐHGXFDWHௐDQGௐ GULYHௐ6RXUFHZHOOௐJURZWKௐ
2XUௐFXUUHQWௐPDUNHWLQJௐVWUDWHJ\ௐZLWKௐ6RXUFHZHOOௐFRQWUDFWௐ&$7ௐSURYHVௐWRௐEHௐHIIHFWLYHௐ ZLWKௐ\HDURYHU\HDUௐVDOHVௐJURZWKௐ6LQFHௐLQFHSWLRQௐRIௐ&DWHUSLOODU¶Vௐ6RXUFHZHOOௐFRQWUDFWVௐ ௐ&DWHUSLOODUௐJHQHUDWRUVௐKDYHௐEHHQௐVROGௐOHYHUDJLQJௐWKHௐ6RXUFHZHOOௐFRQWUDFWௐ6KRXOGௐZHௐ EHௐIRUWXQDWHௐHQRXJKௐWRௐEHௐDZDUGHGௐDௐFRQWUDFWௐIRUௐ(QHUJ\ௐ*HQHUDWLRQௐLQௐUHVSRQVHௐWRௐ5)3ௐ 
ௐZHௐZLOOௐSURXGO\ௐDQQRXQFHௐWKHௐDZDUGௐSXEOLFO\ௐWKURXJKௐRXUௐPXOWLSOHௐFXVWRPHUIDFLQJௐ WRXFKSRLQWVௐWRௐLQFOXGHௐௐEXWௐQRWௐOLPLWHGௐWR
ௐ

ௐ3UHVVௐ5HOHDVH

ௐ$QQRXQFHPHQWௐLQௐPRQWKO\ௐ(OHFWULFௐ3RZHUௐFXVWRPHUௐHQHZVOHWWHU


ௐ)HDWXUHௐRQௐFDWFRPௐFRRSHUDWLYHௐSXUFKDVLQJௐIRFXVHGௐZHESDJH ௐௐ
KWWSV
ZZZFDWFRPHQB86DUWLFOHVHOHFWULFSRZHUVRXUFHZHOOFRRSHUDWLYHSXUFKDVLQJKWPOௐௐௐ 
ௐ$QQRXQFHPHQWௐRQௐ&DWௐ(OHFWULFௐ3RZHUௐVRFLDOௐPHGLDௐFKDQQHOVௐ )%ௐ/LQNHG,Qௐ7ZLWWHU
ௐௐ

ௐ6RXUFHZHOOௐSURPRWLRQௐDWௐLQGXVWU\ௐHYHQWVௐZHௐDWWHQGௐZKHUHௐWKHௐDXGLHQFHௐLQFOXGHVௐQRQ SURILWVௐDQGௐJRYHUQPHQWௐZLWKLQௐWKHௐ6/('ௐPDUNHWௐLQFOXGLQJௐVFKRROVௐODQGILOOௐDQGௐZDWHUVHZHUௐ WUHDWPHQWௐDSSOLFDWLRQVௐ([DPSOHVௐRIௐௐHYHQWVௐZKHUHௐ*67ௐUHSUHVHQWDWLYHVௐDWWHQGHGௐLQௐ VXSSRUWௐRIௐ&DWHUSLOODUௐDQGௐ6RXUFHZHOOௐLQFOXGHGௐ$PHULFDQௐ3XEOLFௐ:RUNVௐ$VVRFLDWLRQௐ 3:;
ௐ
:DVWHFRQௐ:DVWH([SRௐ:DWHUௐ(QYLURQPHQWௐ)HGHUDWLRQ
Vௐ7HFKQLFDOௐ([KLELWLRQௐDQGௐ
&RQIHUHQFHௐ
:()7(&
ௐ*RYHUQPHQWௐ)OHHWௐ([SRௐ
*);
ௐ1DWLRQDOௐ,QVWLWXWHௐRIௐ*RYHUQPHQWௐ
3URFXUHPHQWௐ
1,*3
ௐ&DOLIRUQLDௐ$VVRFLDWLRQௐRIௐ3XEOLFௐ3URFXUHPHQWௐ2IILFLDOVௐ &$332
ௐ
1DWLRQDOௐ$VVRFLDWLRQௐRIௐ&RXQW\ௐ(QJLQHHUVௐ
1$&(
ௐDQGௐ$PHULFDQௐ3XEOLFௐ:RUNVௐ$VVRFLDWLRQௐ

$3:$
ௐ6QRZௐ&RQIHUHQFHௐ

ௐ8SGDWHௐSURPRWLRQDOௐOLWHUDWXUH

ௐ'HDOHUௐDZDUHQHVVௐSURPRWLRQDOௐHYHQWV


 'HVFULEHௐ\RXUௐXVHௐRIௐWHFKQRORJ\ௐDQGௐ
GLJLWDOௐGDWDௐ
HJௐVRFLDOௐPHGLDௐ
PHWDGDWDௐXVDJH
ௐWRௐHQKDQFHௐ
PDUNHWLQJௐHIIHFWLYHQHVV
&DWHUSLOODUௐDQGௐWKHௐ&DWௐGHDOHUௐQHWZRUNௐDUHௐOHDGHUVௐLQௐXVLQJௐHPHUJLQJௐWHFKQRORJLHVௐWRௐ UHDFKௐRXUௐFXVWRPHUVௐ:HௐPDQDJHௐVHYHUDOௐVRFLDOௐPHGLDௐSODWIRUPVௐDQGௐFDQௐWDUJHWௐ JRYHUQPHQWDOௐVHJPHQWVௐ:HௐDOVRௐORRNௐDWௐSDVWௐSXUFKDVHௐKLVWRU\ௐDQGௐILQDQFLQJௐLQIRUPDWLRQௐ WRௐUHFRJQL]HௐLQௐDGYDQFHௐZKHQௐFXVWRPHUVௐPD\ௐEHௐFRQVLGHULQJௐUHSODFLQJௐPDFKLQHVௐWKH\ௐ RZQௐ
&DWHUSLOODUௐKDVௐWHDPVௐRIௐSHRSOHௐZKRௐKDQGOHௐOHDGVௐIURPௐ&DWFRPௐWRௐJURZௐDQGௐHQKDQFHௐ RQOLQHௐSUHVHQFHௐ&DWௐ(OHFWULFௐ3RZHUௐKDVௐDQௐRQOLQHௐSRUWDOௐWKDWௐKDVௐDELOLW\ௐIRUௐFXVWRPHUVௐWRௐ VL]HௐDௐXQLWௐDQGௐYLHZௐLQYHQWRU\ௐ2XUௐGHDOHUVௐKDYHௐUHVRXUFHVௐIRUௐOHDGௐJHQHUDWLRQௐIURPௐWKLUGௐ SDUW\ௐGDWDEDVHVௐWRௐXQGHUVWDQGௐZKLFKௐRSSRUWXQLWLHVௐDUHௐFRPLQJௐLQௐWKHௐJRYHUQPHQWDOௐDQGௐQRQ SURILWௐVHFWLRQௐ2XUௐGHDOHUVௐXWLOL]HௐWKHVHௐUHVRXUFHVௐSOXVௐ&DWHUSLOODUௐ,QFௐUHVRXUFHVௐWRௐIRFXVௐ DQGௐGULYHௐDQGௐXQGHUVWDQGௐSLSHOLQHௐRIௐRSSRUWXQLW\ௐWKDWௐZHௐFDQௐSURPRWHௐWKHௐ6RXUFHZHOOௐ VROXWLRQௐWKURXJK


 ,Qௐ\RXUௐYLHZௐZKDWௐLVௐ6RXUFHZHOO¶VௐUROHௐ
LQௐSURPRWLQJௐFRQWUDFWVௐDULVLQJௐRXWௐRIௐ
WKLVௐ5)3"ௐ+RZௐZLOOௐ\RXௐLQWHJUDWHௐDௐ
6RXUFHZHOODZDUGHGௐFRQWUDFWௐLQWRௐ\RXUௐ
VDOHVௐSURFHVV"
6RXUFHZHOOௐLVௐDௐZHOOUHVSHFWHGௐFRQWUDFWLQJௐDJHQF\ௐZLWKLQௐWKHௐSXEOLFௐSURFXUHPHQWௐLQGXVWU\ௐ,Wௐ LVௐLPSRUWDQWௐLQௐWKHௐHYHQWௐRIௐDQௐDZDUGௐWKDWௐRXUௐSURGXFWVௐDQGௐORJRVௐEHௐLQFOXGHGௐLQௐ 6RXUFHZHOOௐPDUNHWLQJௐDQGௐZHEVLWHௐ:HௐEHOLHYHௐWKDWௐWKHௐPRVWௐLPSRUWDQWௐUROHௐWKDWௐ6RXFHZHOOௐ FDQௐSOD\ௐLQௐPDUNHWLQJௐRXUௐFRQWUDFWௐDQGௐSURGXFWVௐLVௐWRௐPDUNHWௐWKHPVHOYHVௐDQGௐSURPRWHௐ FRQWUDFWௐSXUFKDVLQJௐDFURVVௐWKHௐLQGXVWU\
,QௐWKHௐHYHQWௐRIௐDQௐDZDUGௐ&DWHUSLOODUௐZLOOௐSXWௐKLJKௐSULRULW\ௐLQௐEXLOGLQJௐDZDUHQHVVௐDQGௐ HQWKXVLDVPௐZLWKLQௐRXUௐGHDOHUௐQHWZRUNௐDQGௐFXVWRPHUௐEDVHௐWRௐOHYHUDJHௐWKHௐ6RXUFHZHOOௐ FRQWUDFWௐDVௐRXUௐJRௐWRௐPDUNHWௐVWUDWHJ\


Bid Number: RFP 092222 Vendor Name: Caterpillar





  



Redlands Regular Meeting of 09-03-24 1957 of 1977

$UHௐ\RXUௐSURGXFWVௐRUௐVHUYLFHVௐ
DYDLODEOHௐWKURXJKௐDQௐHSURFXUHPHQWௐ
RUGHULQJௐSURFHVV"ௐ,IௐVRௐGHVFULEHௐ\RXUௐ
HSURFXUHPHQWௐV\VWHPௐDQGௐKRZௐ
JRYHUQPHQWDOௐDQGௐHGXFDWLRQDOௐ
FXVWRPHUVௐKDYHௐXVHGௐLW
:HௐGRௐRIIHUௐDௐHSURFXUHPHQWௐRUGHULQJௐSURFHVVௐIRUௐSDUWVௐYLDௐSDUWVFDWFRPௐ:HௐFDQௐDOVRௐ LQWHJUDWHௐLQWRௐDௐYDULHW\ௐRIௐSURFXUHPHQWௐV\VWHPVௐIRUௐKLJKௐYROXPHௐFXVWRPHUVௐ :HௐHQDEOHௐFXVWRPHUVௐWRௐVL]HௐDQGௐFRQILJXUHௐRXUௐOHVVௐFRPSOH[ௐSURGXFWVௐYLHZௐDYDLODEOHௐ LQYHQWRU\ௐDQGௐHQJDJHௐGHDOHUVௐRQOLQHௐDWௐSRZHUFDWFRPௐ2XUௐODUJHUௐSURGXFWVௐDUHௐFRPSOH[ௐ DQGௐRIWHQௐFXVWRPFRQILJXUHGௐ$ௐFRQVXOWDWLYHௐVDOHVSHUVRQௐLVௐLQWHJUDOௐWRௐHQVXULQJௐWKDWௐ JHQHUDWRUௐVHWVௐDUHௐFRQILJXUHGௐDQGௐEXLOWௐWRௐSHUIRUPௐZHOOௐLQௐWKHLUௐH[SHFWHGௐGXWLHVௐ)RUௐWKLVௐ UHDVRQௐZHௐRQO\ௐLQFOXGHௐRXUௐOHVVௐFRPSOH[ௐSURGXFWVௐRQOLQHௐ:HௐHQFRXUDJHௐRXUௐLQGHSHQGHQWௐ GHDOHUVௐWRௐRIIHUௐRSWLRQVௐEH\RQGௐWKRVHௐIURPௐ&DWHUSLOODUௐ6RXUFHZHOOௐPHPEHUVௐDUHௐIUHHௐWRௐ XVHௐWKRVHௐRSWLRQV


7DEOH
9DOXH$GGHG$WWULEXWHV
/LQH
,WHP 4XHVWLRQ 5HVSRQVH

 'HVFULEHௐDQ\ௐSURGXFWௐHTXLSPHQWௐ
PDLQWHQDQFHௐRUௐRSHUDWRUௐWUDLQLQJௐ
SURJUDPVௐWKDWௐ\RXௐRIIHUௐWRௐ
6RXUFHZHOOௐSDUWLFLSDWLQJௐHQWLWLHVௐ
,QFOXGHௐGHWDLOVௐVXFKௐDVௐZKHWKHUௐ
WUDLQLQJௐLVௐVWDQGDUGௐRUௐRSWLRQDOௐ
ZKRௐSURYLGHVௐWUDLQLQJௐDQGௐDQ\ௐ
FRVWVௐWKDWௐDSSO\
$OOௐGHDOHUVௐRIIHUௐEDVLFௐRSHUDWLRQௐVDIHW\ௐDQGௐPDLQWHQDQFHௐWUDLQLQJௐZLWKௐHYHU\ௐVDOHௐ$OOௐ &DWHUSLOODUௐRSHUDWLRQௐDQGௐPDLQWHQDQFHௐPDQXDOVௐSURYLGHGௐZLWKௐRXUௐHTXLSPHQWௐKDYHௐ LQVWUXFWLRQVௐIRUௐVDIHௐRSHUDWLRQௐRIௐRXUௐHTXLSPHQWௐ6KRXOGௐDௐFXVWRPHUௐGHVLUHௐPRUHௐDGYDQFHGௐ WUDLQLQJௐVXFKௐDVௐSURGXFWLYLW\ௐLPSURYHPHQWௐRUௐDGYDQFHGௐUHSDLUVௐHDFKௐRIௐRXUௐGHDOHUVௐFDQௐ VXSSO\ௐWKDWௐWUDLQLQJௐ2IWHQௐWKHUHௐLVௐDௐFRVWௐDVVRFLDWHGௐZLWKௐWKDWௐVSHFLILFௐWUDLQLQJௐDQGௐLIௐZRXOGௐ EHௐQHJRWLDWHGௐEHWZHHQௐWKHௐGHDOHUௐDQGௐWKHௐFXVWRPHUௐ
&DWHUSLOODUௐDOVRௐRIIHUVௐWUDLQLQJௐSURJUDPVௐGLUHFWO\ௐWRௐFXVWRPHUVௐLQௐWKUHHௐDUHDVௐௐRSHUDWLRQௐ VDIHW\ௐDQGௐVHUYLFHௐ0HPEHUVௐPD\ௐDFFHVVௐFRXUVHVௐRQOLQHௐYLDௐ&' VௐRUௐWKURXJKௐLQVWUXFWRUOHGௐ
FODVVHVௐOHDGLQJௐWRௐRSHUDWRUௐFHUWLILFDWLRQVௐ7KHௐIHHVௐIRUௐWKHVHௐVHUYLFHVௐYDU\ௐGHSHQGLQJௐRQௐWKHௐ GHSWKௐRIௐWUDLQLQJௐGHVLUHGௐௐ7KHVHௐKLJKOHYHOௐLQVWUXFWOHGௐFRXUVHVௐFDQௐEHௐFRQGXFWHGௐDWௐௐ RQHௐRIௐRXUௐGHGLFDWHGௐWUDLQLQJௐIDFLOLWLHVௐLQௐWKHௐ86ௐRUௐRQௐDௐFXVWRPHU VௐORFDOௐVLWHௐXVLQJௐWKHLUௐ
RZQௐHTXLSPHQW


Bid Number: RFP 092222 Vendor Name: Caterpillar





  



Redlands Regular Meeting of 09-03-24 1958 of 1977
 'HVFULEHௐDQ\ௐWHFKQRORJLFDOௐ
DGYDQFHVௐWKDWௐ\RXUௐSURSRVHGௐ
SURGXFWVௐRUௐVHUYLFHVௐRIIHU
7HFKQRORJ\ௐLVௐDௐNH\ௐSURGXFWௐGLIIHUHQWLDWRUௐIRUௐ&DWHUSLOODUௐௐ7RௐGHVFULEHௐHDFKௐRIௐWKHPௐLQௐGHWDLOௐ ZRXOGௐH[SDQGௐWKHௐOHQJWKௐRIௐWKLVௐUHVSRQVHௐEH\RQGௐDௐUHDVRQDEOHௐOHYHOௐௐ)RUௐEUHYLW\ௐNH\ௐௐ WHFKQRORJLHVௐVSHFLILFௐWRௐSURGXFWVௐLQௐWKLVௐ5)3ௐDUHௐOLVWHGௐEHORZௐௐ0RUHௐGHWDLOVௐDUHௐDYDLODEOHௐ RQௐRXUௐSURGXFWௐSDJHVௐRQௐZZZFDWFRPௐ
ௐௐௐௐ&DWௐ5HPRWHௐ$VVHWௐ0RQLWRULQJௐDQGௐWHOHPDWLFVௐDUHௐDYDLODEOHௐRQௐHYHU\ௐJHQHUDWRUௐ *HQHUDWRUVௐVPDOOHUௐWKDQௐ&ௐFRPHௐHTXLSSHGௐZLWKௐ3URGXFWௐ/LQNௐGHYLFHVௐZKLFKௐDOORZௐHDVHௐRIௐ VHWXSௐIRUௐPRQLWRULQJௐ7KLVௐDOORZVௐFXVWRPHUVௐDQGௐGHDOHUVௐWRௐPRQLWRUௐJHQHUDWRUௐKHDOWKௐDQGௐ RSHUDWLRQௐZLWKௐWKHௐLQWHQWௐRIௐHDUO\ௐLVVXHௐGHWHFWLRQௐ7KURXJKௐRXUௐSURSULHWDU\ௐIOHHWௐPRQLWRULQJௐ VRIWZDUHௐZHௐDUHௐOHDGHUVௐLQௐXVLQJௐWHFKQRORJ\ௐWRௐSUHYHQWௐXQH[SHFWHGௐGRZQWLPHௐ ௐௐௐௐௐௐ&DWHUSLOODUௐKDVௐLQYHVWHGௐLQௐFRQWUROOHUௐWHFKQRORJ\ௐIRUௐJHQHUDWRUVௐRIIHULQJௐRXUௐ(0&3ௐ ௐFRQWUROௐSDQHOௐIRUௐPRVWௐJHQHUDWRUௐRIIHULQJVௐ7KLVௐFRQWUROOHUௐKDVௐDQௐHDV\WRXVHௐLQWHUIDFHௐ DQGௐDOORZVௐIRUௐSDUDOOHOLQJௐRIௐPXOWLSOHௐXQLWVௐFUHDWLQJௐUHGXQGDQFLHVௐௐDQGௐDOORZLQJௐFXVWRPHUVௐ HYHQௐPRUHௐSURWHFWLRQௐDJDLQVWௐRXWDJHVௐ
ௐௐௐௐ&DWHUSLOODUௐHTXLSVௐHYHU\ௐ7LHUௐௐ,QWHULP6WDJHௐ,,,%ௐHQJLQHௐZLWKௐ$&(57ŒௐWHFKQRORJ\ௐZLWKௐ DQௐLGHDOௐFRPELQDWLRQௐRIௐHOHFWURQLFௐIXHOௐDLUௐDQGௐDIWHUWUHDWPHQWௐFRPSRQHQWVௐEDVHGௐRQௐHQJLQHௐ VL]HௐWKHௐW\SHௐRIௐDSSOLFDWLRQௐDQGௐWKHௐJHRJUDSKLFௐORFDWLRQௐLQௐZKLFKௐLWௐZLOOௐZRUNௐ$SSO\LQJௐ WHFKQRORJLHVௐV\VWHPDWLFDOO\ௐDQGௐVWUDWHJLFDOO\ௐRSWLPL]HVௐWKHPௐWRௐPHHWௐRXUௐFXVWRPHUV¶ௐKLJKௐ H[SHFWDWLRQVௐIRUௐSURGXFWLYLW\ௐIXHOௐHIILFLHQF\ௐUHOLDELOLW\ௐDQGௐVHUYLFHௐOLIHௐ7KHௐULJKWௐWHFKQRORJ\ௐ ILQHWXQHGௐIRUௐWKHௐULJKWௐDSSOLFDWLRQௐUHVXOWVௐLQௐLPSURYHGௐIXHOௐHIILFLHQF\ௐERRVWHGௐSRZHUௐDQGௐ SHUIRUPDQFHௐDFURVVௐDSSOLFDWLRQVௐQRௐDGGLWLRQDOௐVSDFHௐUHTXLUHPHQWVௐDQGௐUHGXFHGௐHPLVVLRQVௐ ZLWKௐXSௐWRௐ
ௐSHUFHQWௐUHGXFWLRQௐLQௐSDUWLFXODWHௐPDWWHUௐ
SP
ௐDQGௐௐSHUFHQWௐUHGXFWLRQௐLQௐ
R[LGHVௐRIௐQLWURJHQௐ
12[

ௐௐௐௐ$VௐWKHௐJOREDOௐFOLPDWHௐFKDQJHVௐPRUHௐFRPSDQLHVௐDUHௐWXUQLQJௐWRௐVXVWDLQDEOHௐVROXWLRQVௐ WRௐKHOSௐORZHUௐWKHLUௐFDUERQௐIRRWSULQWௐ5HQHZDEOHௐK\GURJHQௐDQGௐK\GURJHQௐEOHQGVௐDUHௐDPRQJௐ VHYHUDOௐDOWHUQDWLYHௐIXHOVௐFXVWRPHUVௐDUHௐFRQVLGHULQJௐDFKLHYLQJௐWKHLUௐVXVWDLQDELOLW\ௐJRDOVௐ /HYHUDJLQJௐௐ\HDUVௐRIௐH[SHUWLVHௐLQௐK\GURJHQௐWHFKQRORJLHVௐDFURVVௐPXOWLSOHௐHQGௐPDUNHWVௐ &DWHUSLOODUௐFRQWLQXHVௐWRௐLPSURYHௐWKHௐSHUIRUPDQFHௐRIௐK\GURJHQIXHOHGௐSRZHUௐWHFKQRORJLHVௐZLWKௐ PLQLPDOௐLPSDFWVௐRQௐPDLQWHQDQFHௐFRVWVௐDQGௐVFKHGXOHVௐDYDLODELOLW\ௐDQGௐRSHUDWLRQV ௐௐௐௐ&DWHUSLOODUௐRIIHUVௐDௐIXOOௐUDQJHௐRIௐ&DWŠௐ0LFURJULGௐSURMHFWVௐIURPௐN:ௐWRௐ0:ௐ WKURXJKௐRXUௐJOREDOௐGHDOHUௐQHWZRUNௐ7KHௐSURMHFWVௐZRXOGௐLQFOXGHௐDQௐLQWHJUDWHGௐRUௐVWDQGDORQHௐ VROXWLRQௐXVLQJௐVRODUௐHQHUJ\ௐVWRUDJHௐDQGRUௐGLHVHOJDVௐJHQHUDWRUௐVHWVௐ:HௐFDQௐDOVRௐRIIHUௐ PRQLWRULQJௐVHUYLFHVௐIRUௐRXUௐSURMHFWVௐ7KHௐVROXWLRQVௐDUHௐDOOௐPRGXOHௐDQGௐVFDODEOHௐ2XUௐ&$7ௐ GHDOHUVௐFDQௐRIIHUௐSURGXFWௐXSJUDGHVௐILQDQFLQJௐVHUYLFHVௐZDUUDQWLHVௐVHUYLFHௐDJUHHPHQWVௐDQGௐ SDUWVௐDYDLODELOLW\ௐ:HௐZLOOௐFXVWRPL]HௐRXUௐPLFURJULGௐWHFKQRORJLHVௐWRௐPHHWௐ\RXUௐEXVLQHVVௐDQGௐ LQGXVWU\ௐQHHGV
ௐௐௐௐ,Qௐௐ&DWHUSLOODUௐDFTXLUHGௐ7DQJHQWௐ(QHUJ\ௐ6ROXWLRQVௐDQௐ(QHUJ\DVDVHUYLFHௐ FRPSDQ\ௐ7DQJHQWௐSURYLGHVௐFXVWRPHUVௐZLWKௐWXUQNH\ௐVROXWLRQVௐIRUௐUHGXFLQJௐHQHUJ\ௐFRVWVௐ LQFUHDVLQJௐHQHUJ\ௐHIILFLHQF\ௐUHGXFLQJௐHPLVVLRQVௐPRQHWL]LQJௐHOHFWULFௐJULGௐVXSSRUWௐDQGௐ SURYLGLQJௐUHVLOLHQF\ௐIRUௐFXVWRPHUௐRSHUDWLRQVௐ7DQJHQWௐ(QHUJ\¶VௐSURSULHWDU\ௐVRIWZDUHௐVROXWLRQVௐ PRQLWRUௐSDWWHUQVௐIURPௐJULGௐDQGௐFOLHQWௐIDFLOLWLHVௐDQDO\]HௐRSSRUWXQLWLHVௐLQௐHQHUJ\ௐPDUNHWVௐDQGௐ WKHQௐGLVSDWFKௐUHVRXUFHVௐWRௐPD[LPL]HௐUHWXUQௐZLWKRXWௐGLVUXSWLQJௐQRUPDOௐEXVLQHVVௐRSHUDWLRQV 

 'HVFULEHௐDQ\ௐ³JUHHQ´ௐLQLWLDWLYHVௐ
WKDWௐUHODWHௐWRௐ\RXUௐFRPSDQ\ௐRUௐWRௐ
\RXUௐSURGXFWVௐRUௐVHUYLFHVௐDQGௐ
LQFOXGHௐDௐOLVWௐRIௐWKHௐFHUWLI\LQJௐ
DJHQF\ௐIRUௐHDFK
$Wௐ&DWHUSLOODUௐVXVWDLQDELOLW\ௐLVௐDQௐLPSRUWDQWௐFRPPLWPHQWௐWRௐEXLOGLQJௐDௐEHWWHUௐZRUOGௐ 6XVWDLQDELOLW\ௐLVௐSDUWௐRIௐZKRௐZHௐDUHௐDQGௐZKDWௐZHௐGRௐHYHU\ௐGD\ௐௐLWௐLVௐRQHௐRIௐ&DWHUSLOODU Vௐௐ
FRUHௐYDOXHVௐௐ:HௐUHFRJQL]HௐSURJUHVVௐLQYROYHVௐDௐEDODQFHௐRIௐHQYLURQPHQWDOௐVWHZDUGVKLSௐ VRFLDOௐUHVSRQVLELOLW\ௐDQGௐHFRQRPLFௐJURZWKௐ
:HௐFRQVLGHUௐWKLVௐDVௐZHௐZRUNௐWRZDUGௐDௐYLVLRQௐRIௐDௐZRUOGௐLQௐZKLFKௐSHRSOH VௐEDVLFௐQHHGVௐௐ
VXFKௐDVௐVKHOWHUௐFOHDQௐZDWHUௐHGXFDWLRQௐDQGௐUHOLDEOHௐHQHUJ\ௐௐDUHௐIXOILOOHGௐ:HௐSURYLGHௐZRUNௐௐ HQYLURQPHQWVௐSURGXFWVௐVHUYLFHVௐDQGௐVROXWLRQVௐWKDWௐPDNHௐSURGXFWLYHௐDQGௐHIILFLHQWௐXVHௐRIௐ UHVRXUFHVௐDVௐZHௐVWULYHௐWRௐDFKLHYHௐRXUௐYLVLRQௐ:HௐEHOLHYHௐWKLVௐFRPPLWPHQWௐVXSSRUWVௐWKHௐௐ HQGXULQJௐWKHௐVXFFHVVௐRIௐRXUௐFXVWRPHUVௐVWRFNKROGHUVௐGHDOHUVௐDQGௐRXUௐSHRSOHௐ&DWHUSLOODUௐLVௐ DௐSURXGௐ\HDUௐPHPEHUௐRIௐWKHௐ'RZௐ-RQHVௐ6XVWDLQDELOLW\ௐ,QGLFHVௐLQFOXGLQJௐERWKௐWKHௐ:RUOGௐ DQGௐ1RUWKௐ$PHULFDௐ,QGLFHVௐ7KHௐDQQXDOVௐ'-6,ௐSURFHVVௐIROORZVௐDௐEHVWLQFODVVௐDSSURDFKௐ HYDOXDWLQJௐQXPHURXVௐFRUSRUDWHௐHFRQRPLFௐHQYLURQPHQWDOௐDQGௐVRFLDOௐSHUIRUPDQFHௐIDFWRUVௐ)RUௐ PRUHௐRQௐVXVWDLQDELOLW\ௐDWௐ&DWHUSLOODUௐSOHDVHௐYLVLWௐRXUௐௐ6XVWDLQDELOLW\ௐ5HSRUWௐIRXQGௐDWௐ &DWHUSLOODUௐ_ௐௐ6XVWDLQDELOLW\ௐ5HSRUW
&DWHUSLOODUௐKDVௐUHFHQWO\ௐDFTXLUHGௐ7DQJHQWௐ(QHUJ\ௐ6ROXWLRQVௐ7DQJHQWௐLVௐDQௐHQHUJ\DVDVHUYLFHௐ FRPSDQ\ௐWKDWௐSURYLGHVௐH[SHUWLVHௐWRௐFXVWRPHUVௐLQௐVWUXFWXULQJௐDQGௐGHYHORSLQJௐSURMHFWVௐWKDWௐ PRQHWL]HௐWKHLUௐSRZHUௐJHQHUDWLRQௐDVVHWVௐ7KLVௐFDSDELOLW\ௐLQFUHDVHVௐDௐFXVWRPHU¶VௐILQDQFLDOௐ UDWLRQDOHௐIRUௐQHZௐLQVWDOODWLRQVௐDQGௐDWௐWKHௐVDPHௐWLPHௐLQFUHDVHVௐSRZHUௐUHOLDELOLW\ௐDQGௐ VXSSRUWVௐWKHLUௐ(6*ௐ
(QYLURQPHQWDOௐ6RFLDOௐDQGௐ*RYHUQDQFH
ௐLQLWLDWLYHVௐ7KLVௐLQYHVWPHQWௐ
LQFUHDVHVௐRXUௐDELOLW\ௐWRௐSDUWLFLSDWHௐLQௐWKHௐJURZLQJௐXWLOLW\ௐVHFWRUௐDQGௐVHOOௐPRUHௐHOHFWULFௐSRZHUௐ SURGXFWVௐ(OHFWULILFDWLRQௐDQGௐ'HFDUERQL]DWLRQௐDUHௐPDMRUௐJURZLQJௐWUHQGVௐLQௐRXUௐHQHUJ\ௐVSDFHௐ 7DQJHQWௐFDQௐKHOSௐZLWKௐWKHௐUHOLDELOLW\ௐRIௐSRZHUௐWKDWௐFXVWRPHUVௐDUHௐORRNLQJௐIRUௐZKLOHௐVLPSOLI\LQJௐ WKHௐSRZHUௐV\VWHPVௐDVௐZHௐPRYHௐIRUZDUGௐWKURXJKௐWKLVௐ(QHUJ\ௐ7UDQVLWLRQ 

Bid Number: RFP 092222 Vendor Name: Caterpillar





  



Redlands Regular Meeting of 09-03-24 1959 of 1977
 ,GHQWLI\ௐDQ\ௐWKLUGSDUW\ௐLVVXHGௐHFR
ODEHOVௐUDWLQJVௐRUௐFHUWLILFDWLRQVௐWKDWௐ
\RXUௐFRPSDQ\ௐKDVௐUHFHLYHGௐIRUௐ
WKHௐHTXLSPHQWௐRUௐSURGXFWVௐ
LQFOXGHGௐLQௐ\RXUௐ3URSRVDOௐUHODWHGௐ
WRௐHQHUJ\ௐHIILFLHQF\ௐRUௐ
FRQVHUYDWLRQௐOLIHF\FOHௐGHVLJQௐ

FUDGOHWRFUDGOH
ௐRUௐRWKHUௐ
JUHHQVXVWDLQDELOLW\ௐIDFWRUV
3ODQWVௐFHUWLILHGௐZLWKௐ,'2ௐ
ௐ(QYLURQPHQWDOௐ0DQDJHPHQWௐ6\VWHPௐLQFOXGH
ௐ

ௐௐ$QFKRUௐ&RXSOLQJௐௐ*ROGVERURௐ1&ௐ,62ௐ
ௐ6HSWௐௐ

ௐௐ$QFKRUௐ&RXSOLQJௐௐ0HQRPLQHHௐௐ,62ௐ
ௐௐௐ-DQௐௐௐ

ௐௐ0DSOHWRQௐௐ
ௐVHOIFHUWLILFDWLRQௐLVVXHGௐ-DQௐௐ

ௐௐ5HPDQௐ6HUYLFHVௐௐ&RULQWKௐ06ௐௐ,62ௐௐ6HSWௐௐ 
ௐ5HPDQௐ6HUYLFHVௐௐ)UDQNOLQௐௐ,62ௐ
0D\ௐௐ
&HUWLILFDWLRQVௐVSHFLILFௐWRௐ(3ௐSURGXFWௐPDQXIDFWXULQJ
ௐ

ௐௐௐௐ/DID\HWWHௐ,1ௐ±ௐ,62ௐ

ௐௐ1RYௐ

ௐௐௐௐ*ULIILQௐ*$ௐ±ௐ,62ௐ

ௐ±ௐ)HEௐ

ௐௐௐௐ6HJXLQௐ7;ௐ,62ௐ




 'HVFULEHௐDQ\ௐ:RPHQௐRUௐ0LQRULW\ௐ
%XVLQHVVௐ(QWLW\ௐ
:0%(
ௐ6PDOOௐ
%XVLQHVVௐ(QWLW\ௐ
6%(
ௐRUௐYHWHUDQௐ
RZQHGௐEXVLQHVVௐFHUWLILFDWLRQVௐWKDWௐ
\RXUௐFRPSDQ\ௐRUௐKXEௐSDUWQHUVௐ
KDYHௐREWDLQHGௐ8SORDGௐ
GRFXPHQWDWLRQௐRIௐFHUWLILFDWLRQௐ
DVௐ

DSSOLFDEOH
ௐLQௐWKHௐGRFXPHQWௐ
XSORDGௐVHFWLRQௐRIௐ\RXUௐUHVSRQVH
7ZRௐ&$7ௐGHDOHUVௐLQௐ1$ௐDUHௐRZQHGௐE\ௐZRPHQ
ௐ)ROH\ௐ(TXLSPHQWௐZLWKௐWHUULWRU\ௐSULPDULO\ௐLQௐ
.DQVDVௐDQGௐ0LVVRXUL
ௐDQGௐ&DVKPDQௐ(TXLSPHQWௐEDVHGௐLQௐ1HYDGDௐ,QௐDGGLWLRQௐWRௐWKHVHௐWZRௐ RZQHUVௐWKHUHௐDUHௐௐRWKHUௐZRPHQௐLQௐRXUௐ1$ௐGHDOHUௐQHWZRUNௐZKRௐKROGௐWKHௐWLWOHVௐRIௐ 3UHVLGHQWௐ9LFHௐ3UHVLGHQWௐRUௐ'LUHFWRUௐ
2QHௐRIௐWKHௐPRUHௐUHFRJQL]HGௐLQLWLDWLYHVௐZLWKLQௐ&DWHUSLOODU Vௐ*OREDOௐ6XSSO\ௐ1HWZRUNௐ'LYLVLRQௐLVௐ
WKHௐ&DWHUSLOODUௐ,QFௐ3URSULHWDU\ௐ,QIRUPDWLRQௐ6XSSOLHUௐ'LYHUVLW\ௐ3URJUDPௐZKLFKௐVSXUVௐHFRQRPLFௐ JURZWKௐE\ௐLQFUHDVLQJௐEXVLQHVVௐRSSRUWXQLWLHVௐWRௐPLQRULW\RZQHGௐZRPHQRZQHGௐYHWHUDQௐDQGௐ VHUYLFHௐGLVDEOHGௐYHWHUDQRZQHGௐVPDOOௐGLVDGYDQWDJHGௐEXVLQHVVHVௐDQGௐWKRVHௐFHUWLILHGௐLQௐ +8%=RQHVௐDOOௐZKLOHௐHQVXULQJௐH[SHFWDWLRQVௐDUHௐPHWௐZLWKௐUHJDUGVௐWRௐTXDOLW\ௐYHORFLW\ௐFDSDFLW\ௐ DQGௐFRVWௐ&XUUHQWO\ௐPRUHௐWKDQௐௐRIௐRXUௐGLUHFWௐDQGௐLQGLUHFWௐSXUFKDVLQJௐLVௐFRQGXFWHGௐZLWKௐ VXSSOLHUVௐLQௐWKHVHௐFDWHJRULHVௐ
&DWHUSLOODUௐLVௐDௐSURXGௐPHPEHUௐRIௐWKHௐ1DWLRQDOௐ0LQRULW\ௐ6XSSOLHUௐ'HYHORSPHQWௐ&RXQFLOௐ

106'&
ௐ:HௐDOVRௐXVHௐWKHௐ6\VWHPௐIRUௐ$ZDUHௐ0DQDJHPHQWௐ
6$0
ௐ6%$ௐDQGௐ106'&ௐ
GDWDEDVHVௐWRௐORFDWHௐ6'%ௐ926%ௐ6'926%ௐDQGௐ+8%=RQHௐVXSSOLHUVௐ 6XSSOLHUௐ'LYHUVLW\ௐLVௐGLVFXVVHGௐZLWKௐ*OREDOௐ6XSSO\ௐ1HWZRUNௐ'LYLVLRQௐOHDGHUVKLSௐGXULQJௐWKHௐ 0RQWKO\ௐ2SHUDWLQJௐ5HVXOWVௐ5HYLHZௐPHHWLQJVௐ7KLVௐLQௐWXUQௐIRUFHVௐDFFRXQWDELOLW\ௐIRUௐGLYHUVௐ VXSSOLHUௐLQFOXVLRQௐE\ௐPHDVXULQJௐGULYHUVௐVXFKௐDVௐWKHௐQXPEHUௐRIௐVRXUFLQJௐSURMHFWVௐZKLFKௐ LQFOXGHௐ'LYHUVௐ6XSSOLHUVௐDQGௐWKHௐYDOXHVௐRIௐWKHௐSURMHFWVௐLQௐZKLFKௐWKH\ௐSDUWLFLSDWHௐ7KHௐJRDOௐ LVௐWRௐFUHDWHௐJUHDWHUௐWUDQVSDUHQF\ௐWRௐGHWHUPLQHௐZKLFKௐWHDPVௐDUHௐFUHDWLQJௐLQFOXVLYHௐ HQYLURQPHQWVௐDQGௐZKLFKௐDUHௐQRWௐ
$ௐIXOOௐUHSRUWௐRQௐ&DWHUSLOODUௐ'LYHUVLW\ௐDQGௐ,QFOXVLRQௐFDQௐEHௐIRXQGௐDWௐ&DWHUSLOODUௐ_ௐ&DWHUSLOODUௐ ௐ'LYHUVLW\ௐ ௐ,QFOXVLRQௐ5HSRUWௐ+LJKOLJKWVௐ3URJUHVVௐZLWKௐ*URZWKௐLQௐ'LYHUVHௐ3RSXODWLRQV 

Bid Number: RFP 092222 Vendor Name: Caterpillar





  



Redlands Regular Meeting of 09-03-24 1960 of 1977
 :KDWௐXQLTXHௐDWWULEXWHVௐGRHVௐ\RXUௐ
FRPSDQ\ௐ\RXUௐSURGXFWVௐRUௐ\RXUௐ
VHUYLFHVௐRIIHUௐWRௐ6RXUFHZHOOௐ
SDUWLFLSDWLQJௐHQWLWLHV"ௐ:KDWௐPDNHVௐ
\RXUௐSURSRVHGௐVROXWLRQVௐXQLTXHௐLQௐ
\RXUௐLQGXVWU\ௐDVௐLWௐDSSOLHVௐWRௐ
6RXUFHZHOOௐSDUWLFLSDWLQJௐHQWLWLHV"
%(67ௐ29(5$//ௐ9$/8(ௐௐ/2:(67ௐ/,)(ௐ&<&/(ௐ&267
ௐ
&$7ௐSURGXFWVௐGHOLYHUௐWKHௐEHVWௐYDOXHௐIRUௐWKHௐPRQH\ௐ:HௐDUHௐKDSS\ௐWRௐGHPRQVWUDWHௐWRௐ FXVWRPHUVௐWKDWௐRXUௐJHQHUDWRUVௐRIIHUௐWKHௐORZHVWௐRYHUDOOௐRZQLQJௐDQGௐRSHUDWLQJௐFRVWVௐZKHQௐ IDFWRUVௐVXFKௐDVௐIXHOௐHIILFLHQF\ௐUHSDLUௐIUHTXHQF\ௐSURGXFWLYLW\ௐDQGௐUHVDOHௐYDOXHௐDUHௐIDFWRUHGௐ LQௐ:HௐEHOLHYHௐWKDWௐJRYHUQPHQWௐDJHQFLHVௐDUHௐWDVNHGௐWRௐEHௐWKHௐEHVWௐVWHZDUGVௐRIௐWD[SD\HUௐ IXQGVௐDQGௐRXUௐSURGXFWVௐFDQௐSURYHௐWKDWௐWKH\ௐDUHௐWKHௐEHVWௐVROXWLRQௐ6RXUFHZHOOௐPHPEHUVௐDUHௐ LQௐWKHௐEHVWௐSRVLWLRQௐWRௐDOORZௐWKHVHௐGLVFXVVLRQVௐWRௐWDNHௐSODFHௐLQௐFRQWUDVWௐWRௐDௐORFDOௐELGௐ VLWXDWLRQௐZKHUHௐWKHௐIRFXVௐLVௐRIWHQௐRQO\ௐRQௐLQLWLDOௐSULFHௐ (;7(1'('ௐ6(59,&(ௐ&29(5$*(
7RௐVKRZௐWKHௐYDOXHௐWKDWௐZHௐSODFHௐRQௐWKLVௐSURSRVHGௐFRQWUDFWௐZHௐZLOOௐFRQWLQXHௐWRௐRIIHUௐDௐ FRPSOLPHQWDU\ௐ*ROGௐDQGௐ3ODWLQXPௐ([WHQGHGௐ6HUYLFHௐ&RYHUDJHௐRQௐPRVWௐPRGHOVௐZKHQௐ SXUFKDVHGௐWKURXJKௐWKHௐ6RXUFHZHOOௐFRQWUDFWௐ'HWDLOVௐRQௐWKHVHௐRIIHULQJVௐFDQௐEHௐIRXQGௐLQௐIO\HUVௐ LQFOXGHGௐLQௐ$WWDFKPHQWVௐ
&$7ௐ6$)(7<ௐ6(59,&(6ௐௐ6$)(7<ௐ)($785(6
ௐ
,QௐDGGLWLRQௐWRௐWKHௐWDQJLEOHௐPHDVXUDEOHௐDVSHFWVௐRIௐWKHௐOLIHௐF\FOHௐFRVWௐHTXDWLRQௐZHௐDOVRௐEULQJௐ RXUௐIRFXVௐRQௐVDIHW\ௐWRௐHYHU\ௐSURGXFWௐWKDWௐZHௐPDQXIDFWXUHௐ4XDQWLI\LQJௐDௐKXPDQௐOLIHௐRUௐௐ GHELOLWDWLQJௐLQMXU\ௐLVௐLPSRVVLEOHௐEXWௐHDFKௐJHQHUDWRUௐKDVௐLQGXVWU\OHDGLQJௐIHDWXUHVௐWKDWௐVWULYHௐ WRௐPLQLPL]HௐWKHௐSRVVLELOLW\ௐIRUௐDFFLGHQWVௐ6RPHௐH[DPSOHVௐLQFOXGH

ௐௐௐௐ8/ௐ&HUWLILHGௐ±ௐDOOௐXQLWVௐLQFOXGHௐJXDUGVௐRYHUௐURWDWLQJௐFRPSDUWPHQWVௐVDIHW\ௐ VKXWGRZQVௐDQGௐDODUPVௐDQGௐJURXQGHGௐZLULQJௐLQVWDOODWLRQVௐDPRQJௐPDQ\ௐRWKHUௐVDIHW\ௐIHDWXUHV ௐௐௐௐ(PHUJHQF\ௐ6WRSௐ%XWWRQௐ
ௐௐௐௐ(QFORVXUHVௐDUHௐORFNDEOHௐWRௐDOORZௐKXPDQௐFRQWDFWௐWRௐEHௐDYRLGHG ௐௐௐௐ;4ௐ3URGXFWௐKDVௐVHSDUDWHGௐFRQWUROௐSDQHOௐWRௐDOORZௐDௐPHPEHUௐWRௐQRWௐKDYHௐWRௐJRௐLQௐ HQFORVXUHௐWRௐPDNHௐJHQHUDWRUௐDGMXVWPHQWVௐ
ௐௐௐௐ;4ௐDOVRௐKDVௐFRYHUௐRYHUௐFXVWRPHUௐFRQQHFWLRQVௐDQGௐFLUFXLWௐEUHDNHUௐWULSVௐZKHQௐRSHQHGௐ ௐௐௐௐ1)3$ௐௐ±ௐ/HYHOௐௐ/LIHௐ6DIHW\ௐVDYHVௐOLYHVௐRIௐSHRSOHௐZKRௐDUHௐLQௐKRVSLWDOVௐQXUVLQJௐ KRPHVௐHWFௐE\ௐUHTXLULQJௐVWDUWXSௐLQௐ;ௐVHFRQGVௐ
ௐௐௐௐ,%&ௐ±ௐFHUWLILHGௐDJDLQVWௐHDUWKTXDNHVௐ
$OOௐFHUWLILFDWLRQVௐRQௐRXUௐSURGXFWVௐDUHௐOLVWHGௐKHUH
ௐ$6
ௐ&6$ௐ&ௐ1Rௐ8/ௐ
8/
ௐ8/
ௐ8/ௐ1)3$ௐ1)3$ௐ1)3$

ௐ1)3$ௐ,%&ௐ,(&ௐ,62ௐ
,62ௐ1(0$ௐ0*ௐ1(0$ௐ0*ௐ
(&ௐ(&ௐ(&
&DWHUSLOODUௐ6DIHW\ௐ6HUYLFHVௐRIIHUVௐFXOWXUHௐMREVLWHௐDQGௐOHDGHUVKLSௐDVVHVVPHQWV ௐVDIHW\ௐDQGௐ
OHDGHUVKLSௐWUDLQLQJௐZRUNVKRSV
ௐDQGௐDௐFRPSUHKHQVLYHௐFRQWLQXRXVௐLPSURYHPHQWௐSURFHVVௐ
WKURXJKௐFRQVXOWDWLYHௐVHUYLFHVௐ6HUYLFHVௐDUHௐIDFLOLWDWHGௐE\ௐ6DIHW\ௐ6HUYLFHVௐFRQVXOWDQWVௐDQGௐ WUDLQLQJௐSURGXFWVௐFDQௐEHௐSXUFKDVHGௐIRUௐVHOILPSOHPHQWDWLRQௐ'HWDLOVௐRQௐSURGXFWVௐDQGௐ VHUYLFHVௐௐ
DUHௐDYDLODEOHௐDWௐZZZFDWFRPVDIHW\
'($/(56+,3ௐ$775,%87(6

%DFNௐXSௐSRZHUௐLVௐDௐFULWLFDOௐDVVHWௐRIௐPDQ\ௐ6RXUFHZHOOௐPHPEHUVௐ&DWHUSLOODUௐGHDOHUVௐEULQJௐDௐ XQLTXHௐVROXWLRQௐWRௐSURYLGHௐVHFRQGௐWRௐQRQHௐVHUYLFHௐWRௐRXUௐFXVWRPHUVௐ8QOLNHௐFRPSHWLWRUVௐRXUௐ GHDOHUVௐRZQௐWKHLUௐRZQௐUHQWDOௐIOHHWௐDQGௐPDNHௐDYDLODEOHௐDVௐQHHGHGௐ(YHQௐZLWKௐVWDWLRQDU\ௐ SURGXFWVௐZHௐKDYHௐRSWLRQVௐWRௐSURYLGHௐEDFNௐXSௐUHQWDOVௐWRௐEHVWௐVHUYHௐ6RXUFHZHOO¶VௐPHPEHUVௐ ZKHQௐHPHUJHQFLHVௐRFFXUௐ2XUௐYDVWௐGHDOHUௐQHWZRUNௐZLWKௐௐORFDWLRQVௐLVௐSRVLWLRQHGௐWRௐ VHUYLFHௐERWKௐXUEDQௐDQGௐUXUDOௐDUHDVௐWKURXJKRXWௐWKHௐ86ௐDQGௐ&DQDGDௐ 352'8&7ௐ$775,%87(6

2YHUௐWKHௐODVWௐILYHௐ\HDUVௐ&DWHUSLOODUௐKDVௐLQYHVWHGௐLQௐDௐSURGXFWௐWKDWௐLVௐORZHUௐFDSH[ௐFRVWௐIRUௐ WKHௐSXEOLFௐDQGௐQRQSURILWௐLQGXVWU\ௐVHFWRUௐ7KLVௐQHZௐOLQHௐRIௐJHQHUDWRUVௐRXUௐ*&ௐPRGHOVௐ LQYROYHGௐDௐUHGHVLJQௐRIௐௐRIௐRXUௐFXUUHQWௐJHQHUDWRUௐRIIHULQJVௐZKLFKௐFUHDWHGௐDQௐDYHUDJHௐFRVWௐ UHGXFWLRQௐRIௐௐ7KHௐFRVWௐVDYLQJVௐLVௐGULYHQௐE\ௐRIIHULQJௐIHZHUௐRSWLRQVௐRQௐWKHVHௐPRGHOVௐ ZLWKRXWௐVDFULILFLQJௐ&DWHUSLOODUௐTXDOLW\


Bid Number: RFP 092222 Vendor Name: Caterpillar





  



Redlands Regular Meeting of 09-03-24 1961 of 1977
7DEOH

:DUUDQW\
'HVFULEHLQGHWDLO\RXUPDQXIDFWXUHUZDUUDQW\SURJUDPLQFOXGLQJFRQGLWLRQVDQGUHTXLUHPHQWVWRTXDOLI\FODLPVSURFHGXUH DQGRYHUDOOVWUXFWXUH<RXPD\XSORDGUHSUHVHQWDWLYHVDPSOHVRI\RXUZDUUDQW\PDWHULDOV LIDSSOLFDEOH
LQWKHGRFXPHQW
XSORDGVHFWLRQRI\RXUUHVSRQVHLQDGGLWLRQWRUHVSRQGLQJWRWKHTXHVWLRQVEHORZ /LQH
,WHP 4XHVWLRQ 5HVSRQVH

 'Rௐ\RXUௐZDUUDQWLHVௐFRYHUௐDOOௐSURGXFWVௐSDUWVௐDQGௐ
ODERU"
<HVௐ&DWHUSLOODUௐKDVௐWKHௐPRVWௐH[WHQVLYHௐZDUUDQW\ௐFRYHUDJHௐLQௐWKHௐLQGXVWU\ௐ:Hௐ FRYHUௐDOOௐSURGXFWVௐSDUWVௐDQGௐODERUௐZLWKௐIHZHUௐH[FOXVLRQVௐWKDQௐRXUௐ FRPSHWLWRUVௐௐ3OHDVHௐVHHௐRXUௐ(3ௐ:DUUDQW\ௐ6WDWHPHQWௐ6(/) 

 'Rௐ\RXUௐZDUUDQWLHVௐLPSRVHௐXVDJHௐUHVWULFWLRQVௐRUௐ
RWKHUௐOLPLWDWLRQVௐWKDWௐDGYHUVHO\ௐDIIHFWௐFRYHUDJH"
:HௐDUHௐSOHDVHGௐWRௐVD\ௐWKDWௐRXUௐZDUUDQWLHVௐFRYHUௐGHIHFWVௐLQௐPDWHULDOௐDQGௐ ZRUNPDQVKLSௐIRUௐWKHௐWLPHௐVSHFLILHGௐLQௐWKHௐSROLF\ௐZKHQௐWKHௐHTXLSPHQWௐLVௐ XVHGௐDVௐSHUௐGHVLJQௐLQWHQW


 'Rௐ\RXUௐZDUUDQWLHVௐFRYHUௐWKHௐH[SHQVHௐRIௐ
WHFKQLFLDQV¶ௐWUDYHOௐWLPHௐDQGௐPLOHDJHௐWRௐSHUIRUPௐ
ZDUUDQW\ௐUHSDLUV"
&DWHUSLOODUௐZDUUDQWLHVௐFRYHUௐWKHௐFRVWௐRIௐUHSODFHPHQWௐSDUWVௐDQGௐWKHௐODERUௐWRௐ LQVWDOOௐWKHPௐ7KH\ௐVRPHWLPHVௐFRYHUௐWUDYHOௐWLPHௐDQGௐPLOHDJHௐ'HDOHUௐ WHUULWRULHVௐYDU\ௐFRQVLGHUDEO\ௐIURPௐVWDWHௐWRௐVWDWHௐDVௐGRௐWKHLUௐSROLFLHVௐDERXWௐ WUDYHOௐWLPHௐDQGௐPLOHDJHௐGXULQJௐWKHௐZDUUDQW\ௐSHULRG



$UHௐWKHUHௐDQ\ௐJHRJUDSKLFௐUHJLRQVௐRIௐWKHௐ8QLWHGௐ
6WDWHVௐRUௐ&DQDGDௐ
DVௐDSSOLFDEOH
ௐIRUௐZKLFKௐ\RXௐ
FDQQRWௐSURYLGHௐDௐFHUWLILHGௐWHFKQLFLDQௐWRௐSHUIRUPௐ
ZDUUDQW\ௐUHSDLUV"ௐௐ+RZௐZLOOௐ6RXUFHZHOOௐ
SDUWLFLSDWLQJௐHQWLWLHVௐLQௐWKHVHௐUHJLRQVௐEHௐSURYLGHGௐ
VHUYLFHௐIRUௐZDUUDQW\ௐUHSDLU"
:HௐKDYHௐQRௐJHRJUDSK\ௐUHVWULFWLRQVௐRQௐZDUUDQW\ௐUHSDLUVௐ2QHௐRIௐRXUௐNH\ௐ GLIIHUHQWLDWLQJௐVWUHQJWKVௐLVௐRXUௐDELOLW\ௐWRௐVHUYLFHௐHTXLSPHQWௐUHJDUGOHVVௐRIௐ ZKHUHௐLWௐLVௐORFDWHG 

 :LOOௐ\RXௐFRYHUௐZDUUDQW\ௐVHUYLFHௐIRUௐLWHPVௐPDGHௐE\ௐ
RWKHUௐPDQXIDFWXUHUVௐWKDWௐDUHௐSDUWௐRIௐ\RXUௐSURSRVDOௐ
RUௐDUHௐWKHVHௐZDUUDQWLHVௐLVVXHVௐW\SLFDOO\ௐSDVVHGௐRQௐ
WRௐWKHௐRULJLQDOௐHTXLSPHQWௐPDQXIDFWXUHU"
:DUUDQW\ௐVHUYLFHௐIRUௐJHQHUDWRUௐRUGHUHGௐIURPௐDௐ&DWHUSLOODUௐIDFLOLW\ௐDUHௐ JHQHUDOO\ௐSURYLGHGௐE\ௐ&DWHUSLOODUௐDQGௐSHUIRUPHGௐE\ௐ&DWௐGHDOHUVௐ6RPHௐ LWHPVௐVXFKௐDVௐEDWWHU\ௐFKDUJHUVௐDUHௐFRYHUHGௐXQGHUௐWKHLUௐPDQXIDFWXUHUV ௐ

ZDUUDQWLHV


 :KDWௐDUHௐ\RXUௐSURSRVHGௐH[FKDQJHௐDQGௐUHWXUQௐ
SURJUDPVௐDQGௐSROLFLHV"
:HௐZDUUDQWௐWKDWௐXSRQௐGHOLYHU\ௐRXUௐSURGXFWVௐZLOOௐEHௐIUHHௐIURPௐGHIHFWVௐLQௐ PDWHULDOௐDQGௐZRUNPDQVKLSௐDQGௐZLOOௐRSHUDWHௐDVௐLQWHQGHGௐ,IௐWKH\ௐDUHௐQRWௐZHௐ ZLOOௐPDNHௐDQ\ௐQHFHVVDU\ௐFRUUHFWLRQV


 'HVFULEHௐDQ\ௐVHUYLFHௐFRQWUDFWௐRSWLRQVௐIRUௐWKHௐ
LWHPVௐLQFOXGHGௐLQௐ\RXUௐSURSRVDO
:HௐKDYHௐDௐODUJHௐYDULHW\ௐRIௐVHUYLFHௐFRQWUDFWௐRSWLRQVௐZKLFKௐFDQௐDOOௐEHௐ FXVWRPL]HGௐDFFRUGLQJௐWRௐFXVWRPHUௐQHHGVௐDQGௐDWௐOHDVWௐHTXDOௐWRௐORFDOௐ FRPSHWLWLRQௐ0RUHௐVROXWLRQVௐDUHௐDYDLODEOHௐDQGௐZHௐHQFRXUDJHௐPHPEHUVௐDQGௐ GHDOHUVௐWRௐௐ
H[SORUHௐDOOௐRSWLRQVௐ
&XVWRPHUௐ9DOXHௐ$JUHHPHQWVௐ
&9$
V

ௐௐ
$ௐPHPEHUௐPD\ௐFKRRVHௐWRௐHQWHUௐDQௐDJUHHPHQWௐZLWKௐWKHLUௐ&DWௐGHDOHUௐWRௐ SHUIRUPௐURXWLQHௐPDLQWHQDQFHௐDQGRUௐUHSDLUVௐ7KHVHௐFRQWUDFWVௐDUH FXVWRPL]DEOHௐEDVHGௐRQௐPHPEHU¶VௐVLWXDWLRQDOௐDQGௐORFDOௐQHHGVௐLQFOXGLQJௐ VRPHௐVWDQGDUGௐRSWLRQVௐDVௐZHOOௐ)RUௐLQVWDQFHௐDOOௐXQLWVௐXQGHUௐN:ௐKDYHௐ VWDQGDUGௐSDUWVௐNLWVௐDYDLODEOHௐ([DPSOHVௐRIௐRSWLRQVௐWKDWௐFDQௐEHௐLQFOXGHGௐLQௐDௐ &9$ௐDUH
ௐ
ௐௐௐௐ&RQGLWLRQௐ0RQLWRULQJ
ௐௐௐௐ/RDGௐ%DQNௐ7HVWLQJ
ௐௐௐௐ([WHQGHGௐ6HUYLFHௐ&RYHUDJHV
&9$
VௐDUHௐDௐXVHIXOௐWRROௐIRUௐPHPEHUVௐWRௐEHWWHUௐPDQDJHௐWKHLUௐEXGJHWௐ0RVWௐ &9$
VௐDUHௐEXQGOHGௐDWௐWKHௐWLPHௐRIௐSXUFKDVH
ௐKRZHYHUௐWKH\ௐPD\ௐEHௐDGGHGௐDWௐ
DQ\ௐWLPH


Bid Number: RFP 092222 Vendor Name: Caterpillar





  



Redlands Regular Meeting of 09-03-24 1962 of 1977
7DEOH
3D\PHQW7HUPVDQG)LQDQFLQJ2SWLRQV
/LQH
,WHP 4XHVWLRQ 5HVSRQVH

 'HVFULEHௐ\RXUௐSD\PHQWௐWHUPVௐDQGௐDFFHSWHGௐSD\PHQWௐ
PHWKRGV
&DWௐGHDOHUVௐDUHௐLQGHSHQGHQWO\ௐRZQHGௐEXVLQHVVHVௐ$VௐVXFKௐWKHLUௐ SD\PHQWௐWHUPVௐYDU\ௐEXWௐDOOௐZLOOௐEHௐDJUHHGௐXSRQௐDWௐWKHௐ32ௐOHYHO 

 'HVFULEHௐDQ\ௐOHDVLQJௐRUௐILQDQFLQJௐRSWLRQVௐDYDLODEOHௐIRUௐXVHௐ E\ௐHGXFDWLRQDOௐRUௐJRYHUQPHQWDOௐHQWLWLHV
&DWHUSLOODU¶VௐZKROO\ௐRZQHGௐVXEVLGLDU\ௐ&DWHUSLOODUௐ)LQDQFLDOௐRIIHUVௐ 6RXUFHZHOOௐPHPEHUVௐOHDVLQJௐDQGௐILQDQFHௐSURGXFWVௐDWௐEHORZௐPDUNHW LQWHUHVWௐUDWHVௐ7KHௐWRWDOௐLQWHUHVWௐFKDUJHGௐLVௐQRUPDOO\ௐOHVVௐWKDQௐWKHௐ WRWDOௐFRVWௐRIௐLVVXLQJௐDௐERQGௐ2IWHQௐWKHVHௐOHDVLQJILQDQFLQJௐRSWLRQVௐ PD\ௐQRWௐUHTXLUHௐYRWHUௐDSSURYDOௐDVௐZLWKௐERQGௐLVVXDQFHௐ7KHVHௐ SURGXFWVௐDOVRௐOHWௐ6RXUFHZHOOௐPHPEHUVௐFDQFHOௐWKHLUௐFRQWUDFWVௐZLWKRXWௐ SHQDOW\ௐ
RQௐWKHௐODVWௐGD\ௐRIௐWKHௐDSSURSULDWLRQVௐSHULRG
ௐLIௐIXQGLQJௐLVௐ
QRWௐDSSURYHGௐIRUௐWKHௐIROORZLQJௐ\HDUௐௐ/HQGLQJௐWHUPVௐDQGௐFRQGLWLRQVௐ DUHௐWUDQVSDUHQWௐWRௐDOOௐ6RXUFHZHOOௐPHPEHUVௐXSRQௐTXRWDWLRQ 

 'HVFULEHௐDQ\ௐVWDQGDUGௐWUDQVDFWLRQௐGRFXPHQWVௐWKDWௐ\RXௐ SURSRVHௐWRௐXVHௐLQௐFRQQHFWLRQௐZLWKௐDQௐDZDUGHGௐFRQWUDFWௐ

RUGHUௐIRUPVௐWHUPVௐDQGௐFRQGLWLRQVௐVHUYLFHௐOHYHOௐ
DJUHHPHQWVௐHWF
ௐ8SORDGௐDௐVDPSOHௐRIௐHDFKௐ
DVௐ

DSSOLFDEOH
ௐLQௐWKHௐGRFXPHQWௐXSORDGௐVHFWLRQௐRIௐ\RXUௐ
UHVSRQVH
&DWௐGHDOHUVௐDUHௐLQGHSHQGHQWO\ௐRZQHGௐEXVLQHVVHVௐ$VௐVXFKௐWKHLUௐ VWDQGDUGௐWUDQVDFWLRQௐGRFXPHQWVௐZLOOௐYDU\


 'Rௐ\RXௐDFFHSWௐWKHௐ3FDUGௐSURFXUHPHQWௐDQGௐSD\PHQWௐ
SURFHVV"ௐ,IௐVRௐLVௐWKHUHௐDQ\ௐDGGLWLRQDOௐFRVWௐWRௐ6RXUFHZHOOௐ SDUWLFLSDWLQJௐHQWLWLHVௐIRUௐXVLQJௐWKLVௐSURFHVV"
%HFDXVHௐ&DWௐGHDOHUVௐZLOOௐEHௐUHFHLYLQJௐSD\PHQWVௐGLUHFWO\ௐIURPௐ PHPEHUVௐDFFHSWLQJௐ3FDUGௐSURFXUHPHQWௐZLOOௐEHௐDWௐWKHLUௐGLVFUHWLRQௐ 0DQ\ௐGHDOHUVௐGRௐDFFHSWௐWKLVௐPHWKRGௐZLWKRXWௐDGGLWLRQDOௐIHHVௐ6RPHௐ KDYHௐOLPLWDWLRQVௐRQௐWKHௐDPRXQWௐWKDWௐFDQௐEHௐSURFHVVHG


Bid Number: RFP 092222 Vendor Name: Caterpillar





  



Redlands Regular Meeting of 09-03-24 1963 of 1977
7DEOH
3ULFLQJDQG'HOLYHU\
3URYLGHGHWDLOHGSULFLQJLQIRUPDWLRQLQWKHTXHVWLRQVWKDWIROORZEHORZ.HHSLQPLQGWKDWUHDVRQDEOHSULFHDQGSURGXFWDGMXVWPHQWVFDQ EHPDGHGXULQJWKHWHUPRIDQDZDUGHG&RQWUDFWDVGHVFULEHGLQWKH5)3WKHWHPSODWH&RQWUDFWDQGWKH6RXUFHZHOO3ULFHDQG3URGXFW &KDQJH5HTXHVW)RUP
/LQH
,WHP 4XHVWLRQ 5HVSRQVH

 'HVFULEHௐ\RXUௐSULFLQJௐPRGHOௐ
HJௐOLQHLWHPௐGLVFRXQWVௐRUௐ
SURGXFWFDWHJRU\ௐGLVFRXQWV
ௐ3URYLGHௐGHWDLOHGௐSULFLQJௐGDWDௐ

LQFOXGLQJௐVWDQGDUGௐRUௐOLVWௐSULFLQJௐDQGௐWKHௐ6RXUFHZHOOௐ
GLVFRXQWHGௐSULFH
ௐRQௐDOOௐRIௐWKHௐLWHPVௐWKDWௐ\RXௐZDQWௐ
6RXUFHZHOOௐWRௐFRQVLGHUௐDVௐSDUWௐRIௐ\RXUௐ5)3ௐUHVSRQVHௐ,Iௐ DSSOLFDEOHௐSURYLGHௐDௐ6.8ௐIRUௐHDFKௐLWHPௐLQௐ\RXUௐSURSRVDOௐ 8SORDGௐ\RXUௐSULFLQJௐPDWHULDOVௐ
LIௐDSSOLFDEOH
ௐLQௐWKHௐ
GRFXPHQWௐXSORDGௐVHFWLRQௐRIௐ\RXUௐUHVSRQVH
2XUௐSULFLQJௐPRGHOௐLVௐVLPSOHௐௐ:HௐRIIHUௐDௐGHHSௐGLVFRXQWௐRIIௐWKHௐ FXUUHQWௐJHQHUDWRUௐOLVWௐSULFHVௐWRௐDOOௐ6RXUFZHOOௐPHPEHUVௐ 2YHUDOOௐSULFLQJௐIURPௐSXEOLVKHGௐOLVWௐSULFHௐLVௐGLVFRXQWHGௐXSௐWRௐௐ ZLWKௐDQௐDYHUDJHௐRIௐௐRYHUDOOௐௐ6SHFLILFௐGLVFRXQWVௐDSSO\ௐWRௐHDFKௐ GLHVHOௐRUௐQDWXUDOௐJDVௐSODWIRUPௐSURGXFWௐOLQHௐௐ6HUYLFHVௐXVHGௐ SURGXFWVௐUHQWDOௐDJUHHPHQWVௐDQGௐPLFURJULGௐVROXWLRQVௐDUHௐDOVRௐ LQFOXGHGௐDWௐGLIIHUHQWௐGLVFRXQWLQJௐOHYHOVௐ:HௐKDYHௐSURYLGHGௐUHIHUHQFHௐ SULFLQJௐLQௐWKHௐGRFXPHQWௐHQWLWOHGௐ&DWHUSLOODUௐ*HQௐ'LVFௐ/LVWௐ5)3 $XJXVWௐ´


 4XDQWLI\ௐWKHௐSULFLQJௐGLVFRXQWௐUHSUHVHQWHGௐE\ௐWKHௐSULFLQJௐ SURSRVDOௐLQௐWKLVௐUHVSRQVHௐ)RUௐH[DPSOHௐLIௐWKHௐSULFLQJௐLQௐ \RXUௐUHVSRQVHௐUHSUHVHQWVௐDௐSHUFHQWDJHௐGLVFRXQWௐIURPௐ
0653ௐRUௐOLVWௐVWDWHௐWKHௐSHUFHQWDJHௐRUௐSHUFHQWDJHௐUDQJH 7KHௐGLVFRXQWVௐDUHௐRIIௐRIௐWKHௐFXUUHQWௐJHQHUDWRUௐOLVWௐSULFHVௐ2XU GLVFRXQWௐUDQJHVௐYDULHVௐEHWZHHQௐௐௐௐRIIௐRIௐWKHௐOLVWௐSULFHௐ GHSHQGLQJௐRQௐWKHௐSURGXFWௐIDPLO\ 


'HVFULEHௐDQ\ௐTXDQWLW\ௐRUௐYROXPHௐGLVFRXQWVௐRUௐUHEDWHௐ
SURJUDPVௐWKDWௐ\RXௐRIIHU
2XUௐGHDOHUVௐDUHௐHPSRZHUHGௐWRௐFRQVLGHUௐSXUFKDVHௐRUGHUௐYROXPHௐ UHSHDWௐSXUFKDVHVௐPHPEHUௐUHVSRQVLYHQHVVௐHWFௐ7KH\ௐPD\ௐRIIHUௐ PHPEHUVௐDGGLWLRQDOௐGLVFRXQWVௐDQGௐRUௐVHUYLFHVௐDWௐWKHLUௐGLVFUHWLRQ 

 3URSRVHௐDௐPHWKRGௐRIௐIDFLOLWDWLQJௐ³VRXUFHG´ௐSURGXFWVௐRUௐ UHODWHGௐVHUYLFHVௐZKLFKௐPD\ௐEHௐUHIHUUHGௐWRௐDVௐ³RSHQௐ
PDUNHW´ௐLWHPVௐRUௐ³QRQVWDQGDUGௐRSWLRQV´ௐ)RUௐH[DPSOHௐ\RXௐ PD\ௐVXSSO\ௐVXFKௐLWHPVௐ³DWௐFRVW´ௐRUௐ³DWௐFRVWௐSOXVௐDௐ
SHUFHQWDJH´ௐRUௐ\RXௐPD\ௐVXSSO\ௐDௐTXRWHௐIRUௐHDFKௐVXFKௐ
UHTXHVW
6RXUFHGௐJRRGVௐௐ2SHQௐ0DUNHWௐ,WHPVௐDUHௐDYDLODEOHௐWRௐPHPEHUVௐIURP RXUௐ&DWௐGHDOHUVௐ7KHௐSULFHVௐIRUௐWKHVHௐJRRGௐRUௐVHUYLFHVௐZLOOௐ UHSUHVHQWௐIDLUௐPDUNHWLQJௐYDOXHௐDQGௐZLOOௐEHௐGHWHUPLQHGௐEHWZHHQௐWKHௐ PHPEHUௐDQGௐWKHௐVHOOLQJௐGHDOHUௐ:HௐHQFRXUDJHௐRXUௐGHDOHUVௐDQGௐ PHPEHUVௐWRௐXVHௐWKLVௐRSWLRQௐDVௐLWௐIDFLOLWDWHVௐFRPSOLPHQWDU\ௐSURGXFWVௐ DQGௐVWUHDPOLQHVௐWKHௐSURFXUHPHQWௐSURFHVVௐ&XVWRPHUVௐDQGௐGHDOHUVௐ DUHௐUHVSRQVLEOHௐIRUௐLQFOXGLQJௐWKHLUௐ6RXUFHZHOOௐFRQWUDFWௐQXPEHUௐDQGௐ PHPEHUௐQXPEHUVௐRQௐDOOௐGRFXPHQWDWLRQௐUHODWHGௐWRௐWKHVHௐSXUFKDVHV &DWHUSLOODUௐ,QFௐLVௐQRWௐDௐSDUW\ௐWRௐWKHVHௐVDOHVௐDQGௐLVௐH[HPSWHGௐIURPௐ LQFOXGLQJௐWKHPௐLQௐTXDUWHUO\ௐUHSRUWVௐ)RUௐDXGLWVௐLQFOXVLRQௐRIௐD

FXVWRPHU
Vௐ6RXUFHZHOOௐPHPEHUௐQXPEHUௐRQௐWKHௐ32ௐDQGRUௐLQYRLFHௐ
VKDOOௐEHௐGHHPHGௐVXIILFLHQW


 ,GHQWLI\ௐDQ\ௐHOHPHQWௐRIௐWKHௐWRWDOௐFRVWௐRIௐDFTXLVLWLRQௐWKDWௐLV 127ௐLQFOXGHGௐLQௐWKHௐSULFLQJௐVXEPLWWHGௐZLWKௐ\RXUௐUHVSRQVHௐ 7KLVௐLQFOXGHVௐDOOௐDGGLWLRQDOௐFKDUJHVௐDVVRFLDWHGௐZLWKௐDௐ SXUFKDVHௐWKDWௐDUHௐQRWௐGLUHFWO\ௐLGHQWLILHGௐDVௐIUHLJKWௐRUௐ VKLSSLQJௐFKDUJHVௐ)RUௐH[DPSOHௐOLVWௐFRVWVௐIRUௐLWHPVௐOLNHௐSUH GHOLYHU\ௐLQVSHFWLRQௐLQVWDOODWLRQௐVHWௐXSௐPDQGDWRU\ௐWUDLQLQJௐ RUௐLQLWLDOௐLQVSHFWLRQௐ,GHQWLI\ௐDQ\ௐSDUWLHVௐWKDWௐLPSRVHௐVXFKௐ FRVWVௐDQGௐWKHLUௐUHODWLRQVKLSௐWRௐWKHௐ3URSRVHU
*HQHUDWRUVௐDUHௐXQLTXHௐLQௐWKHLUௐUHTXLUHPHQWVௐDQGௐRIWHQௐUHTXLUHௐ VSHFLDOL]HGௐVWDUWXSLQVWDOODWLRQௐZKLFKௐFDQௐEHௐGHWHUPLQHGௐZLWKௐWKHௐ GHDOHUௐDWௐWKHௐ32ௐOHYHOௐ:KHQௐDௐGHDOHUௐLVVXHVௐDௐTXRWHௐIRUௐDௐ JHQHUDWRUௐDQ\ௐDGGLWLRQDOௐFRVWVௐZLOOௐEHௐLWHPL]HGௐVHSDUDWHO\ௐDQGௐDUHௐ QRWௐVXEMHFWௐWRௐWKHௐ6RXUFHZHOOௐGLVFRXQW 

 ,IௐIUHLJKWௐGHOLYHU\ௐRUௐVKLSSLQJௐLVௐDQௐDGGLWLRQDOௐFRVWௐWRௐWKHௐ 6RXUFHZHOOௐSDUWLFLSDWLQJௐHQWLW\ௐGHVFULEHௐLQௐGHWDLOௐWKHௐ FRPSOHWHௐIUHLJKWௐVKLSSLQJௐDQGௐGHOLYHU\ௐSURJUDP
7KHUHௐLVௐQRௐDGGLWLRQDOௐFRVWௐWRௐPHPEHUVௐZKRௐFKRRVHௐWRௐSLFNௐXSௐ WKHLUௐJHQHUDWRUௐIURPௐWKHௐ&DWௐGHDOHUௐ)UHLJKWௐDQGௐGHOLYHU\ௐFKDUJHVௐ ZLOOௐEHௐGHWHUPLQHGௐDQGௐDVVHVVHGௐDWௐHDFKௐSURMHFW


 6SHFLILFDOO\ௐGHVFULEHௐIUHLJKWௐVKLSSLQJௐDQGௐGHOLYHU\ௐWHUPVௐRUௐ SURJUDPVௐDYDLODEOHௐIRUௐ$ODVNDௐ+DZDLLௐ&DQDGDௐRUௐDQ\ௐ
RIIVKRUHௐGHOLYHU\
-XVWௐDVௐIRUௐPHPEHUVௐLQௐWKHௐௐFRQWLJXRXVௐVWDWHVௐWKHUHௐLVௐQRௐ DGGLWLRQDOௐFRVWௐWRௐPHPEHUVௐZKRௐFKRRVHௐWRௐSLFNௐXSௐWKHLUௐJHQHUDWRUௐ IURPௐWKHLUௐ&DWௐGHDOHUௐ)UHLJKWௐDQGௐGHOLYHU\ௐFKDUJHVௐZLOOௐEHௐ GHWHUPLQHGௐDQGௐDVVHVVHGௐDWௐHDFKௐSURMHFW


 'HVFULEHௐDQ\ௐXQLTXHௐGLVWULEXWLRQௐDQGRUௐGHOLYHU\ௐPHWKRGVௐRUௐ RSWLRQVௐRIIHUHGௐLQௐ\RXUௐSURSRVDO
*HQHUDWRUVௐDUHௐODUJHௐSXUFKDVHVௐDQGௐLIௐWKHUHௐDUHௐXQLTXHௐPHPEHUௐ UHTXLUHPHQWVௐRXUௐGHDOHUVௐZLOOௐEHௐKDSS\ௐWRௐGLVFXVVௐRQௐDௐFDVHௐE\ௐ FDVHௐEDVLV


7DEOH
3ULFLQJ2IIHUHG
/LQH
,WHP 7KH3ULFLQJ2IIHUHGLQWKLV3URSRVDOLV

&RPPHQWV
 FEHWWHUWKDQWKH3URSRVHUW\SLFDOO\RIIHUVWR*32VFRRSHUDWLYHSURFXUHPHQWRUJDQL]DWLRQVRUVWDWHSXUFKDVLQJ GHSDUWPHQWV
7KLVௐSURSRVHGௐFRQWUDFWௐLVௐ
SULFHGௐWRௐEHௐRXUௐJRWRPDUNHW
VWUDWHJ\ௐDFURVVௐWKHௐ86ௐDQG
&DQDGDௐ:HௐKDYHௐLQFOXGHGௐD
FRPSOLPHQWDU\ௐH[WHQGHGௐ
ZDUUDQW\ௐIRUௐPRVWௐPRGHOVௐ
ZKHQௐSXUFKDVHGௐWKURXJKௐRXU
SURSRVHGௐ6RXUFHZHOOௐFRQWUDFW
Bid Number: RFP 092222 Vendor Name: Caterpillar





  



Redlands Regular Meeting of 09-03-24 1964 of 1977
7DEOH
$XGLWDQG$GPLQLVWUDWLYH)HH
/LQH
,WHP 4XHVWLRQ 5HVSRQVH

 6SHFLILFDOO\ௐGHVFULEHௐDQ\ௐVHOIDXGLWௐSURFHVVௐRUௐSURJUDPௐWKDWௐ\RXௐ SODQௐWRௐHPSOR\ௐWRௐYHULI\ௐFRPSOLDQFHௐZLWKௐ\RXUௐSURSRVHGௐ&RQWUDFW ZLWKௐ6RXUFHZHOOௐ7KLVௐSURFHVVௐLQFOXGHVௐHQVXULQJௐWKDWௐ6RXUFHZHOO SDUWLFLSDWLQJௐHQWLWLHVௐREWDLQௐWKHௐSURSHUௐSULFLQJௐWKDWௐWKHௐ9HQGRUௐ UHSRUWVௐDOOௐVDOHVௐXQGHUௐWKHௐ&RQWUDFWௐHDFKௐTXDUWHUௐDQGௐWKDWௐWKH 9HQGRUௐUHPLWVௐWKHௐSURSHUௐDGPLQLVWUDWLYHௐIHHௐWRௐ6RXUFHZHOOௐ3URYLGHௐ VXIILFLHQWௐGHWDLOௐWRௐVXSSRUWௐ\RXUௐDELOLW\ௐWRௐUHSRUWௐTXDUWHUO\ௐVDOHVௐWRௐ 6RXUFHZHOOௐDVௐGHVFULEHGௐLQௐWKHௐ&RQWUDFWௐWHPSODWH
:HௐSODQௐWRௐFRQWLQXHௐRXUௐYHU\ௐUREXVWௐSURFHVVௐWRௐHQVXUHௐ
UHSRUWLQJௐVSHHGௐDFFXUDF\ௐDQGௐFRQWUDFWௐFRPSOLDQFHௐ
&DWHUSLOODUௐDQGௐRXUௐ&DWௐGHDOHUVௐKDYHௐYHU\ௐFORVHௐDQGௐWUXVWLQJௐ UHODWLRQVKLSVௐ2XUௐGHDOHUVௐDUHௐORQJHVWDEOLVKHGௐDQGௐWKHௐ FXUUHQWௐSURFHVVௐ
XQGHUௐFRQWUDFWௐ&$7
ௐLVௐZRUNLQJௐ
ZHOOௐ
7KHௐ&DWHUSLOODUௐ'HDOHUௐ1HWZRUNௐZLOOௐUHFHLYHௐDGGLWLRQDOௐ GLVFRXQWVௐIURPௐ&DWHUSLOODUௐWRௐKHOSௐUHDFKௐ6RXUFHZHOOௐPHPEHUVௐ SXUFKDVLQJௐSULFHVௐSHUௐWKHௐ6RXUFHZHOOௐFRQWUDFWௐ7RௐTXDOLI\ௐIRUௐ WKHௐGLVFRXQWVௐWKHௐVHOOLQJௐ&DWHUSLOODUௐ'HDOHUௐPXVWௐLGHQWLI\ௐ HDFKௐDSSOLFDEOHௐVDOHௐDVௐDௐ6RXUFHZHOOௐVDOHௐRQௐWKHLUௐRUGHUௐ DQGௐWKH\ௐPXVWௐDOVRௐILOOௐRXWௐDௐUHSRUWௐWRௐWKHௐ&DWHUSLOODUௐ GHVLJQDWHGௐ6RXUFHZHOOௐFXVWRGLDQௐ1LFROHௐ:DUQVWHGWௐLQFOXGLQJௐ WKHௐSURGXFWௐRUGHUௐQXPEHUௐDQGௐ6RXUFHZHOOௐPHPEHUௐQXPEHUௐௐ 5HSRUWVௐDUHௐXSGDWHGௐDQGௐUHYLHZHGௐRQௐDௐTXDUWHUO\ௐEDVLVௐWRௐ DVVLVWௐLQௐSURYLGLQJௐSD\PHQWௐWRௐ6RXUFHZHOOௐ7RௐHQVXUHௐFRUUHFWௐ SULFLQJௐDQGௐDXGLWLQJௐ&DWHUSLOODUௐKDVௐFUHDWHGௐDௐIRFXVௐSURJUDPௐ WKDWௐGHDOHUVௐFDQௐXVHௐRQௐWKHLUௐTXRWHVௐ7KLVௐIRFXVௐSURJUDPௐ DXWRPDWLFDOO\ௐSRSXODWHVௐDVVRFLDWHGௐGLVFRXQWௐOHYHOVௐ7KHௐ &DWHUSLOODUௐGHVLJQDWHGௐ6RXUFHZHOOௐFXVWRGLDQௐ1LFROHௐ
:DUQVWHGWௐKDVௐDQGௐZLOOௐUHPDLQௐDFWLYHO\ௐLQYROYHGௐLQௐWKHௐ DXGLWLQJௐSURFHVVௐERWKௐZLWKௐDXGLWLQJௐ&DWHUSLOODUௐ'HDOHUௐSULFLQJௐ WRௐ6RXUFHZHOOௐPHPEHUVௐDVௐZHOOௐDVௐWKHௐTXDUWHUO\ௐ
DGPLQLVWUDWLRQௐIHHௐSURFHVV


 ,Iௐ\RXௐDUHௐDZDUGHGௐDௐFRQWUDFWௐSURYLGHௐDௐIHZௐH[DPSOHVௐRIௐLQWHUQDOௐ PHWULFVௐWKDWௐZLOOௐEHௐWUDFNHGௐWRௐPHDVXUHௐZKHWKHUௐ\RXௐDUHௐKDYLQJௐ VXFFHVVௐZLWKௐWKHௐFRQWUDFW
,QௐWKHௐHYHQWௐRIௐDQௐDZDUGௐZHௐZLOOௐFRQWLQXHௐWRௐPHDVXUHௐWKHௐ SHUFHQWDJHௐRIௐVDOHVௐWKDWௐDUHௐVROGௐWKURXJKௐWKHௐ6RXUFHZHOOௐ FRQWUDFWௐGHDOHUௐSDUWLFLSDWLRQௐZLWKௐWKHௐFRQWUDFWௐWRWDOௐQXPEHUௐ RIௐJHQVHWVௐVROGௐDQGௐSURJUDPௐJURZWKௐ\HDUௐRYHUௐ\HDU


 ,GHQWLI\ௐDௐSURSRVHGௐDGPLQLVWUDWLYHௐIHHௐWKDWௐ\RXௐZLOOௐSD\ௐWRௐ 6RXUFHZHOOௐIRUௐIDFLOLWDWLQJௐPDQDJLQJௐDQGௐSURPRWLQJௐWKHௐ6RXUFHZHOOௐ &RQWUDFWௐLQௐWKHௐHYHQWௐWKDWௐ\RXௐDUHௐDZDUGHGௐDௐ&RQWUDFWௐௐ7KLVௐIHHௐ LVௐW\SLFDOO\ௐFDOFXODWHGௐDVௐDௐSHUFHQWDJHௐRIௐ9HQGRU¶VௐVDOHVௐXQGHUௐWKHௐ &RQWUDFWௐRUௐDVௐDௐSHUXQLWௐIHH
ௐLWௐLVௐQRWௐDௐOLQHLWHPௐDGGLWLRQௐWRௐWKHௐ
0HPEHU¶VௐFRVWௐRIௐJRRGVௐ
6HHௐWKHௐ5)3ௐDQGௐWHPSODWHௐ&RQWUDFWௐIRUௐ
DGGLWLRQDOௐGHWDLOV

:HௐSURSRVHௐDQௐDGPLQLVWUDWLYHௐIHHௐWRௐ6RXUFHZHOOௐRIௐௐRIௐ WUDQVDFWLRQௐSULFHௐRIௐDQ\ௐQHZௐ&DWHUSLOODUௐJHQHUDWRUVௐVROGௐ WKURXJKௐWKLVௐFRQWUDFWௐ&DWHUSLOODUௐZLOOௐSD\ௐWKLVௐIHHௐWRௐ 6RXUFHZHOOௐDQGௐQRWௐLPSRVHௐUHODWHGௐFKDUJHVௐWRௐRXUௐGHDOHUVௐRUௐ PHPEHUV


Bid Number: RFP 092222 Vendor Name: Caterpillar





  



Redlands Regular Meeting of 09-03-24 1965 of 1977
7DEOH$
'HSWKDQG%UHDGWKRI2IIHUHG(TXLSPHQW3URGXFWVDQG6HUYLFHV /LQH
,WHP 4XHVWLRQ 5HVSRQVH


3URYLGHௐDௐGHWDLOHGௐGHVFULSWLRQௐRIௐWKHௐ
HTXLSPHQWௐSURGXFWVௐDQGௐVHUYLFHVௐWKDWௐ\RXௐ
DUHௐRIIHULQJௐLQௐ\RXUௐSURSRVDO
&DWHUSLOODUௐLVௐSURSRVLQJௐDQௐH[WHQVLYHௐDOWHUQDWLYHௐHQHUJ\ௐVROXWLRQVௐRIIHULQJௐLQFOXGLQJ ௐ
ௐ
DௐIXOOௐOLQHௐRIௐGLHVHOௐDQGௐQDWXUDOௐJDVௐSDFNDJHGௐJHQHUDWRUௐVHWVௐIURPௐௐWRௐௐN:ௐ 
ௐDௐOLQHௐRIௐSULFHௐSRLQWௐFRQILJXUHGௐGLHVHOௐJHQHUDWRUௐVHWVௐXSௐWRௐௐN:ௐDQGௐ ௐ
0LFURJULGௐVRODUௐDQGௐEDWWHU\ௐHQHUJ\ௐVROXWLRQVௐ
7KHௐIROORZLQJௐNH\ௐ&DWHUSLOODUௐSURGXFWௐFDWHJRULHVௐDUHௐLQFOXGHGௐLQௐWKLVௐUHVSRQVH

6WDWLRQDU\ௐ'LHVHOௐ3DFNDJHGௐ*HQHUDWRUௐ6HWV
6WDWLRQDU\ௐ1DWXUDOௐ*DVௐ3DFNDJHGௐ*HQHUDWRUௐ6HWV
0RELOHௐ'LHVHOௐ3DFNDJHGௐ*HQHUDWRUௐ6HWVௐ
;4ௐ3URGXFWVௐZLWKௐ7UDLOHUV

&RQWUROௐ3DQHOV
6ZLWFKJHDU
$XWRPDWLFௐ7UDQVIHUௐ6ZLWFKHV
0LFURJULGௐ&RPSRQHQWV
/HDVLQJௐDQGௐ)LQDQFLQJ
7KHௐ&DWHUSLOODUௐ'HDOHUௐ1HWZRUNௐFDQௐDOVRௐRIIHUௐFXVWRPௐVKRSௐZRUNௐLQVWDOODWLRQௐ³WXUQ NH\´ௐVROXWLRQVௐGHOLYHU\IUHLJKWௐWUDLQLQJௐFXVWRPௐHQFORVXUHVௐFXVWRPௐIXHOௐWDQNVௐFXVWRPௐ DXWRPDWLFௐWUDQVIHUௐVZLWFKHVௐGHDOHUௐODERUௐDGGLWLRQDOFXVWRPௐSDUWVௐHQJLQHHULQJௐ OHDVLQJௐILQDQFLQJௐDQGௐJHQHUDOௐFRQWUDFWLQJௐODERUௐ7RௐIXUWKHUௐHQKDQFHௐWKHௐ6RXUFHZHOOௐ PHPEHUV¶ௐSURGXFWௐRIIHULQJௐWKHௐ&DWHUSLOODUௐ'HDOHUௐ1HWZRUNௐFDQௐDOVRௐRIIHUௐDQௐ H[SDQVLYHௐQHWZRUNௐRIௐXVHGௐHTXLSPHQWௐDORQJௐZLWKௐUHQWDOௐDJUHHPHQWVௐDQGௐPDLQWHQDQFHௐ DJUHHPHQWV


 :LWKLQௐWKLVௐ5)3ௐFDWHJRU\ௐWKHUHௐPD\ௐEHௐ
VXEFDWHJRULHVௐRIௐVROXWLRQVௐ/LVWௐVXEFDWHJRU\ௐ
WLWOHVௐWKDWௐEHVWௐGHVFULEHௐ\RXUௐSURGXFWVௐDQGௐ
VHUYLFHV
1$


7DEOH%
'HSWKDQG%UHDGWKRI2IIHUHG(TXLSPHQW3URGXFWVDQG6HUYLFHV ,QGLFDWHEHORZLIWKHOLVWHGW\SHVRUFODVVHVRIHTXLSPHQWSURGXFWVDQGVHUYLFHVDUHRIIHUHGZLWKLQ\RXUSURSRVDO3URYLGHDGGLWLRQDO FRPPHQWVLQWKHWH[WER[SURYLGHGDVQHFHVVDU\
/LQH
,WHP &DWHJRU\RU7\SH 2IIHUHG
&RPPHQWV
 6WDWLRQDU\ௐHOHFWULFDOௐJHQHUDWLRQௐV\VWHPVௐEDFNXSௐRUௐ VWDQGE\ௐJHQHUDWRUௐVHWVௐPRELOHௐDQGௐJURXQGௐSRZHUௐ
XQLWVௐDQGௐWUDLOHUௐPRXQWHGௐJHQHUDWRUV
<HV
1R
1$


 3DUWVௐDQGௐDFFHVVRULHVௐLQFOXGLQJௐHQFORVXUHVௐIXHOௐ
WDQNVௐDXWRPDWLFௐWUDQVIHUௐVZLWFKHVௐSDUDOOHOLQJௐ
HTXLSPHQWௐVZLWFKௐJHDUVௐFRQQHFWLRQௐER[HVௐFRQWUROVௐ
DODUPௐPRGXOHVௐEDWWHULHVௐEORFNௐKHDWHUVௐDQGௐ
QHWZRUNLQJௐWRROV
<HV
1R
1$


 5HODWHGௐVHUYLFHVௐLQFOXGLQJௐGHVLJQௐFXVWRPL]DWLRQௐ
HQJLQHHULQJௐFRPPLVVLRQLQJௐLQVWDOODWLRQௐGHOLYHU\ௐ
PDLQWHQDQFHௐUHSDLUௐWUDLQLQJௐDQGௐRSHUDWLRQௐVHUYLFHௐ
DQGௐPDLQWHQDQFHௐDJUHHPHQWVௐGHFRPPLVVLRQLQJௐDQGௐ
UHSXUSRVLQJௐFXVWRPௐVKRSௐZRUNௐDQGௐUHQWDOௐVHUYLFHV
<HV
1R
1$


Bid Number: RFP 092222 Vendor Name: Caterpillar





  



Redlands Regular Meeting of 09-03-24 1966 of 1977
Bid Number: RFP 092222 Vendor Name: Caterpillar
Exceptions to Terms, Conditions, or Specifications Form Only those Proposer Exceptions to Term s, C onditions, or Specifications that have been accepted by Sourcew ell have been incorporated into the contract text.

Documents
Ensure your submission document(s) conforms to the following:

1. Documents in PDF format are preferred. Documents in Word, Excel, or compatible formats may also be provided.

2. Documents should NOT have a security password, as Sourcewell may not be able to open the file. It is your sole responsibility to ensure that the uploaded document(s) are not either defective, corrupted or blank and that the documents can be opened and viewed by Sourcewell.

3. Sourcewell may reject any response where any document(s) cannot be opened and viewed by Sourcewell.

4. If you need to upload more than one (1) document for a single item, you should combine the documents into one zipped file. If the zipped file contains more than one (1) document, ensure each document is named, in relation to the submission format item responding to. For example, if responding to the Marketing Plan category save the document as "Marketing Plan." Pricing - Caterpillar Gen Disc List RFP August 2022.xlsx - Tuesday September 20, 2022 15:56:47 Financial Strength and Stability - Financial Strength and Stability.zip - Tuesday September 20, 2022 15:58:41 Marketing Plan/Samples - Marketing Plan.zip - Tuesday September 20, 2022 15:59:03 WM8E/M8E/S8E or Related Certificates (optional)
Warranty Information - SELF5743-01_.pdf - Tuesday September 20, 2022 15:57:54 Standard Transaction Document Samples - Standard Transaction Document Samples.zip - Tuesday September 20, 2022 15:59:30 Upload Additional Document - Additionals.zip - Tuesday September 20, 2022 15:59:44 




  



Redlands Regular Meeting of 09-03-24 1967 of 1977
$GGHQGD7HUPVDQG&RQGLWLRQV
352326(5$)),'$9,7$1'$6685$1&(2)&203/,$1&(
,FHUWLI\WKDW,DPWKHDXWKRUL]HGUHSUHVHQWDWLYHRIWKH3URSRVHUVXEPLWWLQJWKHIRUHJRLQJ3URSRVDOZLWKWKHOHJDODXWKRULW\WRELQGWKH 3URSRVHUWRWKLV$IILGDYLWDQG$VVXUDQFHRI&RPSOLDQFH

 7KH3URSRVHULVVXEPLWWLQJWKLV3URSRVDOXQGHULWVIXOODQGFRPSOHWHOHJDOQDPHDQGWKH3URSRVHUOHJDOO\H[LVWVLQJRRGVWDQGLQJLQ WKHMXULVGLFWLRQRILWVUHVLGHQFH
 7KH3URSRVHUZDUUDQWVWKDWWKHLQIRUPDWLRQSURYLGHGLQWKLV3URSRVDOLVWUXHFRUUHFWDQGUHOLDEOHIRUSXUSRVHVRIHYDOXDWLRQIRU FRQWUDFWDZDUG
 7KH3URSRVHULQFOXGLQJDQ\SHUVRQDVVLVWLQJZLWKWKHFUHDWLRQRIWKLV3URSRVDOKDVDUULYHGDWWKLV3URSRVDOLQGHSHQGHQWO\DQGWKH 3URSRVDOKDVEHHQFUHDWHGZLWKRXWFROOXGLQJZLWKDQ\RWKHUSHUVRQFRPSDQ\RUSDUWLHVWKDWKDYHRUZLOOVXEPLWDSURSRVDOXQGHU WKLVVROLFLWDWLRQ
DQGWKH3URSRVDOKDVLQDOOUHVSHFWVEHHQFUHDWHGIDLUO\ZLWKRXWDQ\IUDXGRUGLVKRQHVW\7KH3URSRVHUKDVQRW GLUHFWO\RULQGLUHFWO\HQWHUHGLQWRDQ\DJUHHPHQWRUDUUDQJHPHQWZLWKDQ\SHUVRQRUEXVLQHVVLQDQHIIRUWWRLQIOXHQFHDQ\SDUWRI WKLVVROLFLWDWLRQRURSHUDWLRQVRIDUHVXOWLQJFRQWUDFW DQGWKH3URSRVHUKDVQRWWDNHQDQ\DFWLRQLQUHVWUDLQWRIIUHHWUDGHRU FRPSHWLWLYHQHVVLQFRQQHFWLRQZLWKWKLVVROLFLWDWLRQ$GGLWLRQDOO\LI3URSRVHUKDVZRUNHGZLWKDFRQVXOWDQWRQWKH3URSRVDOWKH FRQVXOWDQW
DQLQGLYLGXDORUDFRPSDQ\
KDVQRWDVVLVWHGDQ\RWKHUHQWLW\WKDWKDVVXEPLWWHGRUZLOOVXEPLWDSURSRVDOIRUWKLV VROLFLWDWLRQ
 7RWKHEHVWRILWVNQRZOHGJHDQGEHOLHIDQGH[FHSWDVRWKHUZLVHGLVFORVHGLQWKH3URSRVDOWKHUHDUHQRUHOHYDQWIDFWVRU FLUFXPVWDQFHVZKLFKFRXOGJLYHULVHWRDQRUJDQL]DWLRQDOFRQIOLFWRILQWHUHVW$QRUJDQL]DWLRQDOFRQIOLFWRILQWHUHVWH[LVWVZKHQD YHQGRUKDVDQXQIDLUFRPSHWLWLYHDGYDQWDJHRUWKHYHQGRU¶VREMHFWLYLW\LQSHUIRUPLQJWKHFRQWUDFWLVRUPLJKWEHLPSDLUHG  7KHFRQWHQWVRIWKH3URSRVDOKDYHQRWEHHQFRPPXQLFDWHGE\WKH3URSRVHURULWVHPSOR\HHVRUDJHQWVWRDQ\SHUVRQQRWDQ HPSOR\HHRUOHJDOO\DXWKRUL]HGDJHQWRIWKH3URSRVHUDQGZLOOQRWEHFRPPXQLFDWHGWRDQ\VXFKSHUVRQVSULRUWR'XH'DWHRIWKLV VROLFLWDWLRQ
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

 7KH3URSRVHUZLOOFRPSO\ZLWKDOODSSOLFDEOHSURYLVLRQVRIIHGHUDOVWDWHDQGORFDOODZVUHJXODWLRQVUXOHVDQGRUGHUV  7KH3URSRVHUXQGHUVWDQGVWKDW6RXUFHZHOOZLOOUHMHFW5)3SURSRVDOVWKDWDUHPDUNHGFRQILGHQWLDO RUQRQSXEOLFHWF
HLWKHU
VXEVWDQWLDOO\RULQWKHLUHQWLUHW\8QGHU0LQQHVRWD6WDWXWHV6HFWLRQ VXEGLYLVLRQDOOSURSRVDOVDUHFRQVLGHUHGQRQSXEOLF GDWDXQWLOWKHHYDOXDWLRQLVFRPSOHWHDQGD&RQWUDFWLVDZDUGHG$WWKDWSRLQWSURSRVDOVEHFRPHSXEOLFGDWD0LQQHVRWD6WDWXWHV 6HFWLRQSHUPLWVRQO\FHUWDLQQDUURZO\GHILQHGGDWDWREHFRQVLGHUHGDWUDGHVHFUHWDQGWKXVQRQSXEOLFGDWDXQGHU 0LQQHVRWD
V'DWD3UDFWLFHV$FW
 3URSRVHULWVHPSOR\HHVDJHQWVDQGVXEFRQWUDFWRUVDUHQRW

 ,QFOXGHGRQWKH³6SHFLDOO\'HVLJQDWHG1DWLRQDOVDQG%ORFNHG3HUVRQV´OLVWPDLQWDLQHGE\WKH2IILFHRI)RUHLJQ$VVHWV&RQWURO RIWKH8QLWHG6WDWHV'HSDUWPHQWRIWKH7UHDVXU\IRXQGDW KWWSV
ZZZWUHDVXU\JRYRIDFGRZQORDGVVGQOLVWSGI

 ,QFOXGHGRQWKHJRYHUQPHQWZLGHH[FOXVLRQVOLVWVLQWKH8QLWHG6WDWHV6\VWHPIRU$ZDUG0DQDJHPHQWIRXQGDW

KWWSV
VDPJRY6$0
RU
 3UHVHQWO\GHEDUUHGVXVSHQGHGSURSRVHGIRUGHEDUPHQWGHFODUHGLQHOLJLEOHRUYROXQWDULO\H[FOXGHGIURPSURJUDPVRSHUDWHG Bid Number: RFP 092222 Vendor Name: Caterpillar





  



Redlands Regular Meeting of 09-03-24 1968 of 1977
E\WKH6WDWHRI0LQQHVRWD
WKH8QLWHG6WDWHVIHGHUDOJRYHUQPHQWRUWKH&DQDGLDQJRYHUQPHQWDVDSSOLFDEOH RUDQ\
3DUWLFLSDWLQJ(QWLW\9HQGRUFHUWLILHVDQGZDUUDQWVWKDWQHLWKHULWQRULWVSULQFLSDOVKDYHEHHQFRQYLFWHGRIDFULPLQDORIIHQVH UHODWHGWRWKHVXEMHFWPDWWHURIWKLVVROLFLWDWLRQ
%\FKHFNLQJWKLVER[,DFNQRZOHGJHWKDW,DPERXQGE\WKHWHUPVRIWKH3URSRVHU¶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
7KH%LGGHUDFNQRZOHGJHVDQGDJUHHVWKDWWKHDGGHQGXPDGGHQGDEHORZIRUPSDUWRIWKH%LG'RFXPHQW &KHFNWKHER[LQWKHFROXPQ,KDYHUHYLHZHGWKLVDGGHQGXPEHORZWRDFNQRZOHGJHHDFKRIWKHDGGHQGD )LOH1DPH
,KDYHUHYLHZHGWKH
EHORZDGGHQGXPDQG
DWWDFKPHQWV
LI

DSSOLFDEOH

3DJHV
$GGHQGXPBB(OHFWULFDOB(QHUJ\B3RZHUB*HQHUDWLRQB(TXLSPHQWB5)3B 
)UL6HSWHPEHU


$0 
$GGHQGXPBB(OHFWULFDOB(QHUJ\B3RZHUB*HQHUDWLRQB(TXLSPHQWB5)3B 
7XH6HSWHPEHU
30 
$GGHQGXPBB(OHFWULFDOB(QHUJ\B3RZHUB*HQHUDWLRQB(TXLSPHQWB5)3B 
:HG$XJXVW
$0 
$GGHQGXPB(OHFWULFDOB(QHUJ\B3RZHUB*HQHUDWLRQB(TXLSPHQWB5)3B 
:HG$XJXVW
$0 
Bid Number: RFP 092222 Vendor Name: Caterpillar





  



Redlands Regular Meeting of 09-03-24 1969 of 1977
All Discounts listed are for "Standby Ratings only unless otherwise stated".

NOTE: Due to global supply chain cost increases:

1. All new generators are subject to a commodity surcharge of up to 20%.

List Price Discount
C2.2, 60 HZ, 40 - 60 kW Diesel (Reference the "PSNA-EPG-F_C2.2PGABR" Caterpillar Price List) D20 - 20 kW 19%
D25 - 25 kW 19%
D30 - 30 kW 19%
C4.4, 60 HZ, 40 - 60 kW Diesel (Reference the "PSNA-EPG-F_C4.4LCABR" Caterpillar Price List) D40 - 40 kW 31%
D50 - 50 kW 31%
D60 - 60 kW 31%
C4.4, 60 HZ, 80 - 100 kW Diesel (Reference the "PSNA-EPG-F_C4.4PGABR" Caterpillar Price List) D80 - 80 kW 31%
D100 - 100 kW 31%
C4.4 GC, 60 HZ, 200 - 300 kW Diesel (Reference the "C4.4 GCABR" Caterpillar Price List) D40 - 40 kW 31%
D50 - 50 kW 31%
D60 - 60 kW 31%
D80 - 80 kW 31%
D100 - 100 kW 31%
C7.1, 60 HZ, 125 - 200 kW Diesel (Reference the "PSNA-EPG-F_C7.1PGABR" Caterpillar Price List) D125 - 125 kW 35%
D150 - 150 kW 35%
D175 - 175 kW 35%
D200 - 200 kW 35%
C7.1 GC, 60 HZ, 200 - 300 kW Diesel (Reference the "C9 GCABR" Caterpillar Price List) D125 - 125 kW 31%
D150 - 150 kW 31%
D175 - 175 kW 31%
D200 - 200 kW 31%
C9, 60 HZ, 200 - 300 kW Diesel (Reference the "PSNA-EPG-F_C9PGAM" Caterpillar Price List) 200 kW 33%
250 kW 37%
300 kW 37%
C9 GC, 60 HZ, 200 - 300 kW Diesel (Reference the "C9 GCABR" Caterpillar Price List) 250 kW 31%
300 kW 31%
C13, 60 HZ, 350 - 400 kW Diesel (Reference the "PSNA-EPG-F_C13PGAM" Caterpillar Price List) 350 kW 37%
400 kW 37%
C13 GC, 60 HZ, 350 - 400 kW Diesel (Reference the "C13 GCABR" & "C13 GCAM" Caterpillar Price List) 350 kW 31%
400 kW 31%
C15, 60 HZ, 350 - 500 kW Diesel (Reference the "PSNA-EPG-F_C15PGAM" Caterpillar Price List) 350 kW 37%
400 kW 37%
450 kW 37%
500 kW 37%
C15 GC, 60 HZ, 350 - 500 kW Diesel (Reference the "C15 GCABR" & "C15 GCAM" Caterpillar Price List) 350 kW 31%
400 kW 31%
450 kW 31%
500 kW 31%
C18, 60 HZ, 550 - 750 kW Diesel (Reference the "PSNA-EPG-F_C18PGAM" Caterpillar Price List) 550 kW 37%
600 kW 37%
650 kW 33%
700 kW 33%
750 kW 33%
Caterpillar Sourcewell Member Discounts
Stationary Diesel
#C aterpillar: C onfidential Green
C15, 60 HZ, 350 - 500 kW Diesel (Reference the "PSNA-EPG-F_C15PGAM" Caterpillar Price List) C18, 60 HZ, 550 - 750 kW Diesel (Reference the "PSNA-EPG-F_C18PGAM" Caterpillar Price List) 400 kW
500 kW
650 kW
Redlands Regular Meeting of 09-03-24 1970 of 1977
C18 GC, 60 HZ, 550 - 600 kW Diesel (Reference the "C18 GCAM" Caterpillar Price List) 550 kW 31%
600 kW 31%
C18, 60 HZ, EPA Tier 4f, - 455 KW Diesel (Reference the "PSNA-EPG-F_C18PKAM" Caterpillar Price List) 455 kW Prime Power 20%
500 kW 20%
C27, 60 HZ, 750 - 800 kW Diesel (Reference the "PSNA-EPG-F_C27PGBG" Caterpillar Price List) 750 kW 32%
800 kW 32%
C32, 60 HZ, 1000 - 1250 kW Diesel (Reference the "PSNA-EPG-F_C32PGDG" Caterpillar Price List) 1000 kW 33%
1250 kW 34%
C27 GC, 60 HZ, 800 kW Diesel (Reference the "V12 GCAG" Caterpillar Price List) D800 - 800 kW 31%
C32 GC, 60 HZ, 1000-1250 kW Diesel (Reference the "V12 GCAG" Caterpillar Price List) D1000 - 1000 kW 31%
D1250 - 1250 kW 31%
3512C, 60 HZ, 1500 - 1750 kW Diesel
(EPA Tier 2 & CARB Emissions Certified (Nonroad); EPA Tier 2 Emissions Certified for Stationary Use) (Reference the "PSNA-EPG-F_3512PGFL" Caterpillar Price List) 1500 kW 36%
1750 kW 34%
3516C/3516E, 60 HZ, 2000 - 3000 kW Diesel
(EPA Tier 2 & CARB Emissions Certified (Nonroad); EPA Tier 2 Emissions Certified for Stationary Use) (Reference the "PSNA-EPG-F_3516PGFL" Caterpillar Price List) 2000 kW 40%
2500 kW 36%
2750 kW 33%
3000 kW 33%
3516C-HD, 60 HZ, 2000 - 2500 kW Diesel (EPA Tier 4)
(Reference the "PSNA-EPG-F_3516PGFL" Caterpillar Price List) 2000 kW 19%
2500 kW 19%
C175-16, 60 HZ, 3000 kW Diesel (EPA Tier 2 for Mobile and Stationary Use) (Reference the "C175-PGAL" Caterpillar Price List)
3000 kW 29%
C175-16 T4F, 60 HZ, 3000 kW Diesel (EPA Tier 4)
(Reference the "C175-PGAL" Caterpillar Price List)
3000 kW 19%
C175-20, 60 HZ, 4000 kW Diesel (EPA Tier 2 for Mobile and Stationary Use) (Reference the "C175-PGAL" Caterpillar Price List)
4000 kW 24%
50 - 60 kW Caterpillar Natural Gas (Reference the "PSNA-EPG-F_G80PGAM" Caterpillar Price List) DG50 - 80 kW 31%
100 - 200 kW Caterpillar Natural Gas (Reference the "PSNA-EPG-F_G200PGABR" Caterpillar Price List) DG100 - 200 kW 19%
100 - 150 kW Caterpillar Natural Gas (Reference the "PSNA-EPG-F_G150PGAM" Caterpillar Price List) DG100 - 150 kW 35%
175 - 300 kW Olympian Natural Gas (Reference the "PSNA-EPG-F_GASOLYGN" Caterpillar Price List) 175 - 300 kW Caterpillar Natural Gas (Reference the "PSNA-EPG-F-G14.2 PGAN" Caterpillar Price List) DG175 - 175 kW 26%
350 - 450 kW Caterpillar Natural Gas (Reference the "PSNA-EPG-F-G21.9 PGAM" Caterpillar Price List) DG350 - 350 kW 26%
DG400 - 400 kW 26%
DG450 - 450 kW 26%
CG18, 60 Hz, 350 - 500 kW Caterpillar Natural Gas (Reference the "PSNA-EPG-F-CG18 PGAM" Caterpillar Price List) Stationary Natural Gas (Select LP Vapor Options with Derates) #C aterpillar: C onfidential Green
Redlands Regular Meeting of 09-03-24 1971 of 1977
DG350 - 350 kW 23%
DG400 - 400 kW 23%
DG450 - 450 kW 23%
DG500 - 500 kW 23%
G3412, 60 HZ, 375 - 500 kW Natural Gas (Reference the "PSNA-EPG-F_G3412NPG/NGG" Caterpillar Price List) 375 kW 22%
450 kW 20%
500 kW 22%
G3512 60 HZ, 750 - 1000 kW Natural Gas (Reference the "PSNA-EPG-F_G3512NPL" Caterpillar Price List) 750 kW 22%
1000 kW 22%
G3512 60 HZ, 1500kW Natural Gas G3512 HNL
1500kw 20%
G3516 NQL
1500kw 22%
G3516 60 HZ, 750 - 1000 kW Natural Gas, Landfill Gas, & Biogas (Ratings Depend on Selection) (Reference the "PSNA-EPG-F_G3516BNPL" Caterpillar Price List) Removed 18%
G3516C 60 HZ, 1500 kW Natural Gas
(Reference the "PSNA-EPG-F_G3516CNPL" Caterpillar Price List) 1500 kW 22%
G3516A 60HZ (Reference the "PSNA-EPG-F_G3516ANQL" Caterpillar Price List) All 20%
G3516H 60 HZ, 1966 kW Natural Gas (Reference the "PSNA-EPG-F_G3516HNPL" Caterpillar Price List) 1966 kW 20%
G3520H 60 HZ, 2469 kW Natural Gas
(Reference the "PSNA-EPG-F_G3520HNPL" Caterpillar Price List) 2469 kW 20%
G3520 Fast Start 60 HZ, 2.0 - 2.6 MW Natural Gas
(Reference the "PSNA-EPG-F_G3520NPL" Caterpillar Price List) 22%

2.0 - 2.6 MW
G3520C 60 HZ, Natural Gas G3520CLGL and G3520CLPL 20%
ALL
G3520H 60 HZ, Natural Gas G3520HNPL 20%
ALL
CHP Solutions Packages HPS1500N, HPS2000N, HPS2500N

1.4 - 2.5 MW 20%
G3520C 60 HZ, 1600 - 2055 kW Natural Gas
(Reference the "PSNA-EPG-F_G3520CNPL" Caterpillar Price List) Removed 20%
20%
CG132, CG170, CG260 (custom)
Due to the customization and plethora of options, it is not feasible to provide a paper price list for these specific generator sets.

Each quote is custom for the specific application.

However, members will receive a 15% discount off of the configured list price from each member’s local dealer.

XQ35, 60 HZ, 35 kVA Prime Diesel (EPA Tier 4 Final & CARB Emissions Certified (Non-road)) (Reference the "PSNA-EPG-F_XQ35BM" Caterpillar Price List) 27 kW Prime Power 21%
30 kW 21%
XQ60, 60 HZ, 59 kVA Prime Diesel (EPA Tier 4 Final & CARB Emissions Certified (Non-road)) (Reference the "PSNA-EPG-F_XQ60BM" Caterpillar Price List) 48 kW Prime Power *Temporarily Discontinued 21%
XQ125, 60 HZ, 125 kVA Prime Diesel (EPA Tier 4 Final & CARB Emissions Certified (Non-road)) Mobile Diesel (With Trailers)
15%
#C aterpillar: C onfidential Green
Redlands Regular Meeting of 09-03-24 1972 of 1977
(Reference the "PSNA-EPG-F_XQ125BM" Caterpillar Price List) 100 kW Prime Power *Temporarily Discontinued 21%
110 kW *Temporarily Discontinued 21%
XQ230, 60 HZ, 230 kVA Prime Diesel (EPA Tier 4 Final & CARB Emissions Certified (Non-road)) (Reference the "PSNA-EPG-F_XQ230BM" Caterpillar Price List) 182 kW Prime Power 21%
200 kW Prime Power 21%
XQ330, 60 HZ, 330 kVA Prime Diesel (EPA Tier 4 Final & CARB Emissions Certified (Non-road)) (Reference the "PSNA-EPG-F_XQ425BM" Caterpillar Price List) 264 kW Prime Power 21%
288 kW Prime Power 21%
XQ425, 60 HZ, 425 kVA Prime Diesel (EPA Tier 4 Final & CARB Emissions Certified (Non-road)) (Reference the "PSNA-EPG-F_XQ425BM" Caterpillar Price List) 340 kW Prime Power 21%
XQ570, 60 HZ, 570 kVA Prime Diesel (EPA Tier 4 Final & CARB Emissions Certified (Non-road)) (Reference the "PSNA-EPG-F_XQ570BG" Caterpillar Price List) 455 kW Prime Power 21%
XQ1140, 60 HZ, 1140 kVA Prime Diesel (EPA Tier 4 Final & CARB Emissions Certified (Non-road)) (Reference the "PSNA-EPG-F_XQ1140BG" Caterpillar Price List) 910 kW Prime Power 21%
XQ2280, 60 HZ, 2280 kVA Prime Diesel (EPA Tier 4 Final & CARB Emissions Certified (Non-road)) (Reference the "PSNA-EPG-F_XQ1140BG" Caterpillar Price List) 1825 kW Prime Power 21%
Switchgear (customizable) 12%
Epic (Reference the "PSNA-EPG-F_CATEPICG" Price List)
Epic - Master Control Panel 10%
Epic - Generator Control Panel 10%
Epic - Utility Control Panel 10%
Supervisory Contol Panel (Reference the "PSNA-EPG-F_CATSCPN" Price List) EMCP 4.4 SCP 10%
Hybrid Products (Reference the "PSNA-EPG-F_CATSCPN" Price List) All Hybrid Products 22%
XES01AN 21%
ATS (AUTOMATIC TRANSFER SWITCHES) (Reference the "ATS 2022" Price List) 235 ATS's Available 20%
Energy Stoarge System
Due to the customization and plethora of options, it is not feasible to provide a paper price list for Cat switchgear.

However, members will receive a 12% discount off of the configured list price from each member’s local dealer.

Control Panels, Switchgear, Automatic Transfer Switches #C aterpillar: C onfidential Green
Redlands Regular Meeting of 09-03-24 1973 of 1977
Sourced Goods & Support Service Provided
Electrical Energy Power Generation with Related Parts, Supplies, and Services.

Extended Service Contracts 5% off list price / typical sale price if no list price is available Maintenance Agreements 5% off list price / typical sale price if no list price is available Installation 5% off list price / typical sale price if no list price is available Custom Fuel Tank 5% off list price / typical sale price if no list price is available Custom ATS 5% off list price / typical sale price if no list price is available General Contracting Labor 5% off list price / typical sale price if no list price is available Dealer Labor 5% off list price / typical sale price if no list price is available Additional/Custom Parts 5% off list price / typical sale price if no list price is available Caterpillar Sourced Goods & Support Services Multiplier Sourcewell Member Pricing
Custom Shop Work 5% off list price / typical sale price if no list price is available Custom Enclosure 5% off list price / typical sale price if no list price is available Delivery/Freight 5% off list price / typical sale price if no list price is available Training 5% off list price / typical sale price if no list price is available Engineering Services 5% off list price / typical sale price if no list price is available #C aterpillar: C onfidential Green
Redlands Regular Meeting of 09-03-24 1974 of 1977
Caterpillar Used Equipment Multiplier
Every used product will receive the new product family member discount plus at least a 10% discount Electrical Energy Power Generation with Related Parts, Supplies, and Services. #C aterpillar: C onfidential Green
Redlands Regular Meeting of 09-03-24 1975 of 1977
Sourced Good or Support Service Provided
Electrical Energy Power Generation with Related Parts, Supplies, and Services.

Caterpillar Rental Agreements Product & Services Multiplier Sourcewell Member Pricing
Rental Agreements 10% off dealer list price
#C aterpillar: C onfidential Green
Redlands Regular Meeting of 09-03-24 1976 of 1977
Product Name and Product Description Unit of
Issue
Ancilliary
Items (Sold
Separately)
Microgrid
Solution
Commercial
List Price
Power
Analytics CyberSecure
Network List
Price Add
(Optional)
40 FT ISO
Container
List Price
Add
(Optional)
Quantity of
BDPs
Quantity
of 20
Foot
Containe
rs
Grand Total
Commercial List
Price with
Sourcewell
Discount Applied
(Incl Optional
Items)
Sourcewell
Member List
Price Discount
PV Panel (Solar Panels)
Time Shift - 60 Hz ES 1.5 MW-hr, 1x 20', Energy, 570 kVA, 1518 kWh, ~127 min Each N/A $ 1,309,989 N/A 1 1 $ 1,021,791 22.00% Time Shift - 60 Hz ES 3.0 MW-hr, 2x 20', Energy, 1000 kVA, 3036 kWh, ~145 min Each N/A $ 2,263,804 N/A 1 2 $ 1,765,767 22.00% Time Shift - 60 Hz ES 3.5 MW-hr, 2x 20', Energy, 1000 kVA, 3542 kWh, ~170 min Each N/A $ 2,507,909 N/A 1 2 $ 1,956,169 22.00% Time Shift - 60 Hz ES 4.0 MW-hr, 2x 20', Energy, 1000 kVA, 4048 kWh, ~194 min Each N/A $ 2,750,774 N/A 1 2 $ 2,145,604 22.00% Time Shift - 60 Hz ES 4.6 MW-hr, 3x 20', Energy, 1000 kVA, 4554 kWh, ~218 min Each N/A $ 3,257,104 N/A 1 3 $ 2,540,541 22.00% Time Shift - 60 Hz ES 5.1 MW-hr, 3x 20', Energy, 1000 kVA, 5060 kWh, ~242 min Each N/A $ 3,461,724 N/A 1 3 $ 2,700,145 22.00% Time Shift - 60 Hz ES 5.6 MW-hr, 3x 20', Energy, 1000 kVA, 5566 kWh, ~267 min Each N/A $ 3,705,829 N/A 1 3 $ 2,890,547 22.00% Time Shift - 60 Hz ES 6.1 MW-hr, 3x 20', Energy, 1000 kVA, 6072 kWh, ~291 min Each N/A $ 3,948,694 N/A 1 3 $ 3,079,981 22.00% Time Shift - 60 Hz ES 6.6 MW-hr, 3x 20', Energy, 1000 kVA, 6578 kWh, ~315 min Each N/A $ 4,191,559 N/A 1 3 $ 3,269,416 22.00% Time Shift - 60 Hz ES 7.1 MW-hr, 4x 20', Energy, 1000 kVA, 7084 kWh, ~340 min Each N/A $ 4,708,735 N/A 1 4 $ 3,672,813 22.00% Time Shift - 60 Hz ES 7.6 MW-hr, 4x 20', Energy, 1000 kVA, 7590 kWh, ~364 min Each N/A $ 4,903,749 N/A 1 4 $ 3,824,924 22.00% Time Shift - 60 Hz ES 8.1 MW-hr, 4x 20', Energy, 1000 kVA, 8096 kWh, ~388 min Each N/A $ 5,145,374 N/A 1 4 $ 4,013,392 22.00% Time Shift - 60 Hz ES 8.6 MW-hr, 4x 20', Energy, 1000 kVA, 8602 kWh, ~412 min Each N/A $ 5,389,479 N/A 1 4 $ 4,203,793 22.00% Time Shift - 60 Hz ES 9.1 MW-hr, 4x 20', Energy, 1000 kVA, 9108 kWh, ~437 min Each N/A $ 5,632,344 N/A 1 4 $ 4,393,228 22.00% Grid Stabilizer - 60 Hz PGS1260, 1x 20', Power, 1000 kVA, 672 kWh, ~32 min Each N/A $ 990,332 N/A 1 1 $ 772,459 22.00% Grid Stabilizer - 60 Hz PGS840, 1x 20', Power, 840 kVA, 448 kWh, ~25 min Each N/A $ 853,487 N/A 1 1 $ 665,720 22.00% Due to the customization and plethora of options, it is not feasible to provide a paper price list for these specific components at this time.

For pricing and availability, Sourcewell members can contact their local Caterpillar Dealer. #C aterpillar: C onfidential Green
Redlands Regular Meeting of 09-03-24 1977 of 1977

← All documents from this meeting