Cities Index.
Agenda

Richmond City Council
June 25, 2024

Document
Agenda
Meeting
June 25, 2024
Body
Richmond City Council
Pages
167
Original file
308.3 MB
Text extracted from the city's file for reading and search. Open the original on pub-richmond.escribemeetings.com. That file is the official record.

DocuSign Envelope ID: B7ACCE96-C424-4895-8242-44B9540D1759 DocuSign Envelope ID: 2FE08130-C1C2-44B2-80E2-C5C57703B17D DocuSign Envelope ID: A19EB526-6F3D-4776-8C54-97A6A8F93E06 691
DRAFT
Confidential Information confidential at all times after the completion of work with American Rivers, and (b) not make use of the Confidential Information for Contractor’s own behalf or on behalf of any third party.

7. Ownership of Intellectual Property. Materials prepared or delivered by Contractor to American Rivers under the terms of this Agreement (“Work”) shall be works made for hire created for and owned by American Rivers and are the exclusive property of American Rivers. To the extent that any material does not constitute work made for hire as a matter of law, Contractor hereby grants and assigns to American Rivers exclusive rights to the material under United States intellectual property law and all international conventions, including without limitation, copyrights, trade secrets, and patents in and to such materials and the right to copyright the material and any renewals thereof in the name of American Rivers.

Contractor also hereby assigns to American Rivers and/or waives any and all claims that Contractor may now or hereafter have in any jurisdiction to so-called “moral rights” in connection with the Work. Contractor shall secure the same agreement from all independent contractors performing services in connection with Contractor’s performance under this Agreement. Contractor warrants that it is the sole creator of the Work except for such material from copyrighted sources as is reproduced by written permission of the copyright owner, and that the Work: (i) is original (except for such material from copyrighted sources as is reproduced by written permission of the copyright owner); (ii) contains no matter that is scandalous, obscene or libelous or otherwise contrary to law; and (iii) contains only information and data that is true and accurate to the best of Contractor’s knowledge, belief, and expertise.

8. Termination without Cause. American Rivers may cancel this Agreement, at any time and without cause, by giving the Contractor fifteen (15) calendar days’ written notice of cancellation. In the event of termination of this Agreement for a reason other than Contractor’s default, American Rivers shall pay Contractor for (i) all services rendered and all reimbursable costs incurred by Contractor up to the date of receipt of notice of termination, and (ii) all direct and documented expenses reasonably incurred by Contractor in connection with the orderly termination of this Agreement, as determined by American Rivers in its sole discretion. In no event shall American Rivers be liable for any indirect, special or consequential expenses incurred by Contractor or its subconsultants, including, but not limited to, lost profits, overhead, margin, or intangible costs.

9. Termination for Lack of Funding. Should the primary source of funding for this project be reduced, deleted or delayed by the federal or state budget process or other budget control actions, and the work under this agreement is canceled or suspended, American Rivers shall provide written notice to Contractor and be liable for any work completed pursuant to the Task Order up to the date of receipt of the written notice and shall have no liability for payment for work undertaken after such date.

10. Termination with Cause. In the event that one of the parties is in default as defined below, the non-breaching party may, in its sole reasonable discretion, immediately cancel the Agreement without penalty by giving the breaching party written notice of such cancellation which shall not excuse breaches of this Agreement that already may have occurred.

A. Contractor Default: Default on the part of Contractor shall include, without being limited to, the occurrence of any of the following events:
(i) failure by Contractor to comply with any of the provisions of this Agreement in a satisfactory manner as reasonably determined by American Rivers and failure to cure

Page 2 of 16 ends

DocuSign Envelope ID: B7ACCE96-C424-4895-8242-44B9540D1759 DocuSign Envelope ID: 2FE08130-C1C2-44B2-80E2-C5C57703B17D DocuSign Envelope ID: A19EB526-6F3D-4776-8C54-97A6A8F93E06 692
DRAFT
such violation within five (5) calendar days after receipt of written notice of said violation; or
(ii) Contractor becomes listed on the federal government’s list of parties excluded from receiving Federal contracts, certain subcontracts, and certain Federal financial and nonfinancial assistance and benefits, pursuant to the provisions of 31 U.S.C. 6101, note, E.O. 12549, E.O. 12689, 48 CFR 9.404, and each agency's codification of the Common Rule for Nonprocurement suspension and debarment (www.sam.gov -- System for Award Management (SAM)); or
(iii)filing by Contractor of a voluntary petition under any bankruptcy, reorganization, insolvency, or any other law for the relief of, or relating to debtors; the filing against Contractor of an involuntary petition in bankruptcy or a receiver or trustee is appointed to take possession of Contractor’s property, any of Contractor’s property is subjected to levy, seizure, assignment, application or sale for or by any creditor or governmental agency, and such action is not dismissed within thirty (30) calendar days thereafter; or Contractor becomes insolvent; or
(iv) dissolution of Contractor voluntarily, involuntarily or by operation of law; or (v) assignment of this Agreement by Contractor to any other entity without the prior written consent of American Rivers.

B. American Rivers Default: Default on the part of American Rivers shall include, without being limited to, the occurrence of any of the following events:
(i) failure by American Rivers to make approved payments to Contractor within sixty (60) business days after receipt of written notice from Contractor of failure to comply with the payment specifications described in this Agreement; or (ii) dissolution of American Rivers voluntarily, involuntarily or by operation of law.

11. Time is of the Essence. Time is of the essence for this Contract and American Rivers and Contractor agree that any time period set forth in Attachment A represents their best estimates with respect to completion dates. However, both American Rivers and Contractor acknowledge that departures from the schedule may occur and will make reasonable efforts to notify the other party of changes to the schedule. Further, neither American Rivers nor Contractor shall be responsible for any delay in performance arising from any event that is not caused by and is beyond the reasonable control of the nonperforming Party, regardless of whether the event was foreseeable. Such events include, but are not limited to, force majeure events such as natural disasters, pandemics, action or inaction by a government entity, an accident such as a fire or explosion not due to the negligence of the Party seeking to be excused, war, acts of terrorism including threats of terrorism, a riot, or unusually severe weather. The Party affected by the event shall provide notice of the delay in writing to the other Party no later than (7) calendar days after the Party has knowledge that a delay has, will, or may occur. Following the occurrence of such an event, American Rivers and Contractor shall confer to determine the best course of action for resuming the Work and setting new performance timelines. Both American Rivers and Contractor shall, at all times, take reasonable steps within their respective powers and consistent with best practices to:
(a) Prevent force majeure events from affecting the performance of their obligations under this Agreement
(b) Mitigate the effects of force majeure events; and
(c) Timely comply with their obligations under this Agreement.

12. Nonassignability. This Agreement may not be assigned to any other entity or person without the express written consent of American Rivers.

Page 3 of 16 ends

DocuSign Envelope ID: B7ACCE96-C424-4895-8242-44B9540D1759 DocuSign Envelope ID: 2FE08130-C1C2-44B2-80E2-C5C57703B17D DocuSign Envelope ID: A19EB526-6F3D-4776-8C54-97A6A8F93E06 693
DRAFT

13. Indemnification. Contractor agrees to indemnify and to hold American Rivers, the City of Richmond, and each entity’s directors, officers, employees, and agents harmless from and against all claims, actions, damages, liabilities, demands, costs, and expenses, including reasonable attorney fees, resulting from or attributable to any act within the scope of this Agreement by Contractor, its employees, or agents (i) in violation of any of the provisions of this Agreement, or (ii) in violation of any law, rule, or regulation of the United States or its agencies or of any state or its agencies, or (iii) resulting from the negligence or willful misconduct of Contractor. The foregoing indemnity provision shall survive and remain in full force and effect following termination of this Agreement for any such act occurring during the initial term or any renewal term of this Agreement.

American Rivers agrees to indemnify and to hold Contractor, its directors, officers, employees, and agents harmless from and against all claims, actions, damages, liabilities, demands, costs, and expenses, including reasonable attorney fees, resulting from or attributable to any act within the scope of this Agreement by American Rivers, its employees, or agents (i) in violation of any of the provisions of this Agreement, or (ii) in violation of any law, rule, or regulation of the United States or its agencies or of any state or its agencies, or (iii) resulting from the negligence or willful misconduct of American Rivers. The foregoing indemnity provision shall survive and remain in full force and effect following termination of this Agreement for any such act occurring during the initial term or any renewal term of this Agreement.

14. Insurance. Contractor and its subcontractor(s) shall obtain and maintain for the Term of this Agreement, usual and customary policies of insurance, including, Errors and Omissions in the amount of $1,000,000; Workers’ Compensation in the maximum amounts required by law; Automobile Liability with bodily injury limits of at least $1,000,000.00 per accident for bodily injury and property damage.; and Commercial General Liability (CGL) insurance in the amount of $2,000,000 per occurrence for bodily injury, personal injury and property damage, and Worker’s Compensation as required by law with Employer’s Liability of no less than $1,000,000. All policies shall be with insurers admitted to transact business in the State of California and having a current Best's rating of "A:VII" or better, and shall name American Rivers, Inc., , Contra Costa County, the State of California and City of Richmond, and their respective elective and appointive boards, commissions, officers, agents, employees, and volunteers as additional insureds. Contractor’s policy shall cover the additional insureds with respect to liability arising out of automobiles owned, leased, hired or borrowed by or on behalf of the Contractor; and with respect to liability arising out of work or operations, including completed operations, performed by or on behalf of the Contractor including materials, parts or equipment furnished in connection with the work or operations.

Such policies shall state "insurance is primary and all other insurance shall be noncontributory", shall waive all rights of subrogation against the additional insureds; and shall also contain a provision that American Rivers shall be notified in writing thirty (30) days before the policies may be canceled or allowed to expire or any reduction in coverage. include American Rivers and the State of California as an additional insured under its CGL policy, and provide American Rivers with a copy of the Endorsement.

Delivery of this Endorsement to American Rivers shall be a condition precedent to the first payment to Contractor. The insurance policies shall also contain a provision by which the insurer agrees that such policy shall not be canceled except after thirty (30) days written notice to American Rivers.

15. Right of Entry. Contractor shall coordinate with American Rivers, in obtaining the right to

Page 4 of 16 ends

DocuSign Envelope ID: B7ACCE96-C424-4895-8242-44B9540D1759 DocuSign Envelope ID: 2FE08130-C1C2-44B2-80E2-C5C57703B17D DocuSign Envelope ID: A19EB526-6F3D-4776-8C54-97A6A8F93E06 694
DRAFT
enter the property where the Work is to be performed.

16. Compliance.

A. Throughout the term of the Agreement, Contractor and its subcontractors shall comply with all rules indicated in the Attachment B, terms and conditions imposed by the funder(s) of this project.

B. Contractor shall comply with all federal, state and local laws, applicable statutes, Executive Orders, Office of Management and Budget circulars, and terms and conditions of the applicable source of funding for this Agreement, and regulations in effect, or reasonably expected to be in effect, including but not limited to, environmental laws and regulations, as of the date of completion of the Agreement.

C. Design changes made necessary by newly enacted laws, codes and regulations after this date shall entitle Contractor to a reasonable adjustment in the Project schedule and additional compensation as necessary to complete the tasks outlined in the Task Order affected by such newly enacted laws, codes and regulations.

17. Warranty. All supervisors, employees, subcontractors and authorized representatives assigned to perform services under this Agreement shall be fully qualified and specially trained in their respective responsibilities and shall perform the assigned services with care and diligence.

Contractor represents and warrants that all of Contractor’s services, including the estimate of cost, the setting of the schedule, and all work performed by subcontractors shall be performed in a professional and workmanlike manner.

18. Safety Precautions and Protection of Property. Contractor shall plan and conduct the work to safeguard its staff and property from injury. Contractor shall direct performance of work in compliance with reasonable safety and work practices and applicable federal, state, and local laws, rules, and regulations including, but not limited to, occupational safety and health standards. Contractor shall follow any site-specific safety plans, as may be required by state and local government during the global pandemic caused by the Covid-19 virus. Neither the issuance of special instructions by American Rivers nor the adherence thereto by Contractor shall relieve Contractor of the sole responsibility to maintain safe and efficient working conditions. Should a death, serious personal injury, or substantial property damage occur in connection with the performance of this Contract, Contractor shall notify American Rivers immediately.

19. Applicable Law. This Agreement will be governed by the laws of the State of California and any action relating to this Agreement shall be instituted and prosecuted in the courts of Contra Costa County, California. This Agreement can be amended only by a written amendment signed by American Rivers and Contractor.

20. Legal Relationship of Parties. Nothing in this Agreement shall be construed as constituting a partnership, joint venture, employment relationship, agent/principal relationship, or other association of any kind, between the parties hereto, and neither party shall have the power to obligate or bind the other party in any manner whatsoever.

21. Conflict of Interest. Contractor agrees to notify American Rivers of any potential conflict of interest and/or related party transaction that could occur as a result of performance of the contract. Notification should be sent to American Rivers’ primary business address to the attention of the Office of the General Counsel.

22. Merger and Modification. This Agreement contains the entire agreement between the parties

Page 5 of 16 ends

DocuSign Envelope ID: B7ACCE96-C424-4895-8242-44B9540D1759 DocuSign Envelope ID: 2FE08130-C1C2-44B2-80E2-C5C57703B17D DocuSign Envelope ID: A19EB526-6F3D-4776-8C54-97A6A8F93E06 695
DRAFT
and any previous agreement is merged into this Agreement. This Agreement may be modified only by subsequent written agreement signed by both parties.

23. Survival of Certain Provisions. Any rights or remedies accruing to a party hereto after the termination or cancellation of this Agreement, including, without limitation, the provisions regarding Indemnification, Confidentiality, and Company Information shall survive such termination or cancellation.

Page 6 of 16 ends

DocuSign Envelope ID: B7ACCE96-C424-4895-8242-44B9540D1759 DocuSign Envelope ID: 2FE08130-C1C2-44B2-80E2-C5C57703B17D DocuSign Envelope ID: A19EB526-6F3D-4776-8C54-97A6A8F93E06 696
DRAFT
ACCEPTED AND AGREED:

American Rivers, Inc. Restoration Design Group
BY: BY:

PRINTED
Kristin M. May NAME:

Chief Financial Officer TITLE:

DATE: DATE:

Page 7 of 16 ends

DocuSign Envelope ID: B7ACCE96-C424-4895-8242-44B9540D1759 DocuSign Envelope ID: 2FE08130-C1C2-44B2-80E2-C5C57703B17D DocuSign Envelope ID: A19EB526-6F3D-4776-8C54-97A6A8F93E06 697
DRAFT

ATTACHMENT A

SCOPE OF WORK

1. Work to be performed:

Please see below Scope of Services dated June 3, 2022.

2. Term:

July 1, 2022 – March 1, 2024

3. Budget:

Not to exceed $125,500
American Rivers must receive or have on file a completed W-9 and insurance documentation from Contractor before payment can be processed.

Contractor shall invoice American Rivers quarterly as certain work and deliverables are completed. Invoices shall describe the activities used in support of this Agreement in the relevant quarter. American Rivers shall pay the undisputed portion of invoices within thirty (30) calendar days after receipt of invoice. All invoices must include: 1) the total contract amount, 2) less previous invoice(s) amounts, 3) less the current invoice amount, 4) total amount of contract remaining, and 5) evidence of any match fulfilled with during that invoicing period.

Page 8 of 16 ends

DocuSign Envelope ID: B7ACCE96-C424-4895-8242-44B9540D1759 DocuSign Envelope ID: 2FE08130-C1C2-44B2-80E2-C5C57703B17D DocuSign Envelope ID: A19EB526-6F3D-4776-8C54-97A6A8F93E06 698
DRAFT
RDG

RESTORATION
DESIGN

GROUP, INC

BERKELEY
2332 5th Street, Suite C
Berkeley
California 94710
510.644.2798

MEDFORD
1495 S Oakdale Avenue
Medford
Oregon 97501
541.238.2812
RestorationDesignGroup.com

SCOPE OF SERVICES
Flood Risk Reduction in the Rheem Creek Watershed
Task 1.03. Design and Engineering Services
A. UPDATED PERMIT SET
This task will update the existing 65%/Permit set of construction documents in response to initial permit agency requests. The updated 65% Design set will be submitted to the permit agencies with other updated permit materials.

Deliverables:
• Updated 65% Plans in PDF and AutoCAD Civil 3D format
B. 90% PLANS, SPECIFICATIONS, AND ESTIMATE (PS+E)
This task will advance the 65% design based on redline, mark-ups, phone calls, updates and refinements from Client, stakeholder, and permit agency input. After submittal, RDG will have a review meeting with the Client to advance planning and design for the 100% set.

Deliverables:
• 90% Opinion of Probable Costs
• 90% Plans in PDF and AutoCAD Civil 3D format
• Draft Technical Specifications in CSI Format
• Review meeting with Client
Assumptions:
• Technical specifications are in CSI format (per RDG standards) • Storm Water Pollution Prevention Plan (SWPPP) will be prepared by the selected contractor for the project (post-bid)
• Client will assemble a single set of written review comments from all reviewers and resolve any conflicting or unclear comments prior to submitting to RDG
C. 100% PLANS, SPECIFICATIONS, AND ESTIMATE (PS+E)
This task will advance the 90% PS+E based on redline, mark-ups, phone calls, updates and refinements from Client and stakeholder input.

Deliverables:
• 100% Opinion of Probable Costs
• 100% Design Drawings in PDF and AutoCAD Civil 3D format • Final Technical Specifications in CSI Format
Assumptions:
• Technical specifications are in CSI format (per RDG standards)

Page 9 of 16 ends

DocuSign Envelope ID: B7ACCE96-C424-4895-8242-44B9540D1759 DocuSign Envelope ID: 2FE08130-C1C2-44B2-80E2-C5C57703B17D DocuSign Envelope ID: A19EB526-6F3D-4776-8C54-97A6A8F93E06 699
DRAFT
Restoration
Design
Group, Inc

FLOOD RISK REDUCTION IN THE RHEEM CREEK WATERSHED / PROPOSAL 3 JUNE 2022
2 • Client will provide Division 1 specifications
• Plans do not include dewatering plans (assumed to be provided by the selected construction contractor)
• Project will be constructed in a single phase - Services related to preparing plans for phased construction other than that noted in the scope of services are not included
D. BID SET PLANS, SPECIFICATIONS, AND ESTIMATE (PS+E)
This task will advance the 100% PS+E based on redline, mark-ups, phone calls, updates and refinements from Client and stakeholder input. Changes to the bid set plan will be limited to corrections and do not include design changes. Plans, Specifications, and Estimate will be suitable for public bid.

Deliverables:
• Bid set Opinion of Probable Costs
• Bid set Design Drawings in PDF and AutoCAD Civil 3D format • Final Technical Specifications in CSI Format
E. COORDINATING MEETINGS
This task includes time for monthly check-in meetings through June 2023 (initiation of construction).

Deliverables:
• Attendance at monthly coordinating meetings
• Figures, documents, and meetings not listed in the scope are assumed to be not included in the scope and available via a contract amendment Task 1.05. Environmental Documents
RDG will revise the permit application, attachments, and supporting documents for the US Army Corps of Engineers 404 CWA Certification, Regional Water Quality Control Board 401 CWA Certification, and California Department of Fish and Wildlife 1600 Lake and Streambed Alteration Agreement. RDG will submit revised permit packets (including updated permit set construction documents (Task 1.02) to the respective permit agencies. RDG will follow up with contacts at the permitting agencies, arrange an on-site meeting with agency staff.

Deliverables:
• Modification of three permit applications (USACE 404, CDFW Lake and Streambed Alteration Agreement, Region 2 RWQCB 401 Certification • Coordination and follow up with permit agencies
• One on-site visit if necessary
Assumptions:
• Letter of Map Revision (LOMR) or Conditional Letter of Map Revision not included

Page 10 of 16 ends

DocuSign Envelope ID: B7ACCE96-C424-4895-8242-44B9540D1759 DocuSign Envelope ID: 2FE08130-C1C2-44B2-80E2-C5C57703B17D DocuSign Envelope ID: A19EB526-6F3D-4776-8C54-97A6A8F93E06 700
DRAFT
Restoration
Design
Group, Inc

FLOOD RISK REDUCTION IN THE RHEEM CREEK WATERSHED / PROPOSAL 3 JUNE 2022
3 • Preparation of a Biological Assessment or coordination of a Section 7 Consultation with US Fish and Wildlife or National Marine Fisheries Service is not included
• Fee for Task 1.05 includes $7500 for permit fees which will be paid by RDG and reimbursed by the grant
Task 2.12. Construction Contract Administration
RDG will provide Construction Contract Administration (CCA) to support the Client. During construction, RDG will be available to observe the site work to evaluate compliance with the Construction Documents. This will include a series of meetings on‐site between RDG and the contractor. After each site visit RDG shall prepare a written memo or email to document the field discussions and decisions made. Review Requests for Change Order proposals from contractor and advise Client on costs and payments. Included is a series of Punch List visits with Client, and a letter of Substantial, and Final project acceptance.

Deliverables:
• Responses to Requests for Information (RFI’s)
• Process and review submittals
• Site Visits and Documentation
• Attendance up to 12 weekly construction meetings (one staff person) • Letter of substantial and final project acceptance
Assumptions:
• Construction will last 12 weeks

COMPENSATION
Task Fee
Task 1.03 Design and Engineering Services $77,500
Task 1.05 Environmental Documents $18,000
Task 2.12 Construction Contract Administration $30,000
TOTAL $125,500
Typical project reimbursables include printing costs, mileage, parking, or courier delivery (if requested). If courier delivery is not requested, hardcopies of deliverables can be picked up at RDG offices in Berkeley; electronic copies will be emailed on request.

Hourly Staff Rates 2022
RDG Principal $200/hr

Page 11 of 16 ends

DocuSign Envelope ID: B7ACCE96-C424-4895-8242-44B9540D1759 DocuSign Envelope ID: 2FE08130-C1C2-44B2-80E2-C5C57703B17D DocuSign Envelope ID: A19EB526-6F3D-4776-8C54-97A6A8F93E06 701
DRAFT
Restoration
Design
Group, Inc

FLOOD RISK REDUCTION IN THE RHEEM CREEK WATERSHED / PROPOSAL 3 JUNE 2022
4 Principal Civil Engineer $200/hr
Principal Landscape Architect $175/hr
Director $150/hr
Landscape Designer $125/hr
Junior Engineer $125/hr
Reimbursables
Mileage $.56/mile
Direct Costs/Reimbursables (Cost+10%)

Page 12 of 16 ends

DocuSign Envelope ID: B7ACCE96-C424-4895-8242-44B9540D1759 DocuSign Envelope ID: 2FE08130-C1C2-44B2-80E2-C5C57703B17D DocuSign Envelope ID: A19EB526-6F3D-4776-8C54-97A6A8F93E06 702
DRAFT

ATTACHMENT B

COMPLIANCE PROVISIONS
The following provisions apply to this Agreement because this Agreement is funded in whole or in part by State of California (State) and the City of Richmond (“City”) funds.

1. Air and Water Law Compliance – Under the State laws, the Contractor shall not be: (1) in violation of any order or resolution not subject to review promulgated by the State Air Resources Board or an air pollution control district; (2) subject to cease and desist order not subject to review issued pursuant to Section 13301 of the Water Code for violation of waste discharge requirements or discharge prohibitions; or (3) finally determined to be in violation of provisions of Federal law relating to air or water pollution.

2. Labor Compliance -- Contractor must comply with applicable California Labor Code requirements, including, but not limited to, Section 1720 et seq. of the California Labor Code regarding public works, limitations on use of volunteer labor (California Labor Code Section 1720.4) and payment of prevailing wages for work done and funded pursuant to this Project, including any payments to the Department of Industrial Relations under California Labor Code Section 1771.3.

3. Union Organizing – Contractor certifies that no request for reimbursement, or payment under this agreement, will seek reimbursement for costs incurred to assist, promote or deter union organizing.

4. Budget Contingency/Limit On State Funds – Should State funding for this project be reduced, deleted or delayed by the federal or state budget process or other budget control actions, and the work under this agreement is canceled or suspended, American Rivers shall provide written notice to Contractor and be liable for any work completed up to the date of receipt of the written notice and shall have no liability for payment for work undertaken after such date.

5. Acknowledgment – Contractor shall coordinate with American Rivers to include appropriate acknowledgement of credit to the State and to all cost-sharing partners for their support when promoting the Project or using any data and/or information developed under this Project.

6. Disclosure Agreement – Any document or written report prepared in whole or in part pursuant to this Agreement shall contain a disclosure statement indicating that the document or written report was prepared through support from Federal and State funding. Contractor shall coordinate with American Rivers in fulfilling this requirement.

7. Americans with Disabilities Act – By signing this Agreement, Contractor assures American Rivers that it complies with the Americans with Disabilities Act (ADA) of 1990, (42 U.S.C., 12101 et seq.), which prohibits discrimination on the basis of disability, as well as all applicable regulations and guidelines issued pursuant to the ADA.

8. Audits – American Rivers, City, and the State, or their designated representative, reserve the right to conduct an audit at any time until the completion of the Project, with the costs of such audit borne by auditing entity. Contractor shall allow auditor(s) access to relevant records during normal business hours and allow interviews of any employees who might reasonably have information related to such records. The records shall include, without limitation, evidence sufficient to reflect properly the amount, receipt, deposit, and disbursement of all funds related to the construction and implementation of the project, and the use, management, operation and maintenance of the real property. Time and effort reports are also required. The Contractor’s accounting and control

Page 13 of 16 ends

DocuSign Envelope ID: B7ACCE96-C424-4895-8242-44B9540D1759 DocuSign Envelope ID: 2FE08130-C1C2-44B2-80E2-C5C57703B17D DocuSign Envelope ID: A19EB526-6F3D-4776-8C54-97A6A8F93E06 703
DRAFT
systems shall conform to generally accepted accounting principles. All records shall provide a breakdown of total costs charged under this Contract, including properly executed payrolls, time records, utility bills, invoices, and vouchers. Contractor shall preserve all records pertaining to the Project for this purpose for at least five (5) years after Project completion and until all Federal or State audits are complete and exceptions resolved for this contract’s funding period.

9. Inspection – City shall have the right to inspect the project or services without notice if they are being performed on City or other public property. If such project or services shall not be performed on City or other public property, City shall have the right to inspect such work upon reasonable notice.

10. Conflict of Interest – Contractor acknowledges, represents and warrants that Contractor shall avoid all conflicts of interest (as defined under any federal, state or local statute, rule or regulation, or at common law) with respect to this Contract. Contractor further acknowledges, represents and warrants that no City official or employee has any economic interest, as defined in Title 2, California Code of Regulations §§ 18703.1 through 18703.5, with Contractor that would invalidate this Contract. Contractor acknowledges that in the event that Contractor shall be found by any judicial or administrative body to have any conflict of interest (as defined above) with respect to this Contract, all consideration received under this Contract shall be forfeited and returned to City forthwith. This provision shall survive the termination of this Contract for one (1) year.

11. Independent Capacity – Contractor and its employees shall act in an independent capacity and not as officers, employees, or agents of the State for the duration of its performance of services under this Agreement.

12. Business and Professions Code and Business License – Contractor and its subcontractor(s) (if applicable) must comply with the Business and Professions Code, including, but not limited to, section 6700 et seq. (Professional Engineers Act) or section 7800 et seq. (Geologists and Geophysicists Act). Further, the Contractor will conduct all work consistent with the professional standards of the industry and type of work performed in the course of the Project. Contractor acknowledges, represents and warrants that Contractor and its employees are skilled and able to competently provide the services hereunder, and possess all professional licenses, certifications, and approvals necessary to engage in their occupations. City has relied upon the professional ability and training of Contractor as a material inducement to enter into this Contract. Contractor shall perform in accordance with generally accepted professional practices and standards of Contractor's profession. In the event that City, in its sole discretion, desires the removal of any person employed or retained by Contractor to perform services hereunder, such person shall be removed immediately upon receiving notice from City.

Contractor shall obtain a City of Richmond Business license before commencement of work, and the business license must be kept current during the term of this Contract for payments to continue to be authorized.

13. Drug-Free Workplace Certification -- By signing this Agreement. Contractor and its subcontractors hereby certify under penalty of perjury under the laws of State of California, compliance with the requirements of the Drug-Free Workplace Act of 1990 (Government Code 8350 et seq.) and that it will have or will provide a drug-free workplace by taking the following actions:
a. publish a statement notifying employees, and its subcontractors that unlawful manufacture, distribution, dispensation, possession, or use of a controlled substance is prohibited and specifying actions to be taken against employees, or subcontractors for violations as required

Page 14 of 16 ends

DocuSign Envelope ID: B7ACCE96-C424-4895-8242-44B9540D1759 DocuSign Envelope ID: 2FE08130-C1C2-44B2-80E2-C5C57703B17D DocuSign Envelope ID: A19EB526-6F3D-4776-8C54-97A6A8F93E06 704
DRAFT
by Government Code Section 8355(0). b) Establish a Drug-Free Awareness Program, as required by Government Code Section 8355
b. to inform employees or subcontractors about all of the following:

1. The dangers of drug abuse in the workplace,

2. Grantee's policy of maintaining a drug-free workplace,

3. Any available counseling, rehabilitation, and employee assistance programs, and

4. Penalties that may be imposed upon employees and subcontractors for drug abuse violations.
c. Provide as required by Government Code Sections 8355(c), that every employee, and/or subcontractor who works under this Agreement:

1. Will receive a copy of Contractor's drug-free policy statement, and

2. Will agree to abide by terms of Contractor's condition of employment, contract or subcontract.

14. Non-Discrimination – During the performance of this Agreement, Contractor and its subcontractors shall not unlawfully discriminate, harass, allow harassment against any employee or applicant for employment or deny benefits to any person because of sex, race, color, ancestry, religious creed, national origin, physical disability (including HIV and AIDS), mental disability, medical condition (cancer), genetic information, age (over 40), marital status, gender, gender identity, gender expression, sexual orientation, military and veteran status, denial of pregnancy disability leave or reasonable accommodation, and denial of family and medical care leave.

Contractor and subcontractors shall ensure that the evaluation and treatment of their employees and applicants for employment are free from such discrimination and harassment. Contractor and its subcontractors shall comply with the provisions of the Fair Employment and Housing Act (California Government Code Section 12990 (a-f) et seq.), the applicable regulations promulgated thereunder (California Code of Regulations, Title 2, Section 11000 et seq.), the provisions of Article 9.5, Chapter 1, Part 1, Division 3, Title 2 of the California Government Code (Gov. Code, § 11135-11139.5), and the regulations or standards adopted by the State Coastal Conservancy to implement such article. The applicable regulations of the Fair Employment and Housing Commission implementing California Government Code Section 12990 (a-f), set forth in Chapter 5 of Division 4 of Title 2 of the California Code of Regulations, are incorporated into this Agreement by reference and made a part hereof as if set forth in full. Contractor and its subcontractors shall give written notice of their obligations under this clause to labor organizations with which they have a collective bargaining or other agreement.

15. Compliance with City Laws – Contractor shall comply with all provisions of the Richmond Municipal Code (“Municipal Code”). Contractor acknowledges that under § 2.60.070 of the Municipal Code ("Living Wage Ordinance"), Contractor shall promptly provide to American Rivers documents and information verifying its compliance with the Living Wage Ordinance. Also as prescribed in § 2.60.070, Contractor shall notify each of its affected employees with regards to the wages that are required to be paid pursuant to the Living Wage Ordinance. Contractor shall comply with § 2.28.030 of the Municipal Code, obligating every Contractor or subcontractor under a contract or subcontract with the City for public work or for goods or for services to refrain from discriminatory employment or subcontracting practices on the basis of race, color, sex, sexual orientation, religious creed, national origin or ancestry of any employee, any applicant for employment or any potential subcontractor. Contractor acknowledges that the City’s Drug Free Workplace Policy, Violence in the Workplace Policy and the Policy Against Workplace Harassment, are available on the City’s website at
http://www.ci.richmond.ca.us/workplacepolicies. Contractor agrees to abide by the terms and conditions of said policies.

Page 15 of 16 ends

DocuSign Envelope ID: B7ACCE96-C424-4895-8242-44B9540D1759 DocuSign Envelope ID: 2FE08130-C1C2-44B2-80E2-C5C57703B17D DocuSign Envelope ID: A19EB526-6F3D-4776-8C54-97A6A8F93E06 705
DRAFT

16. Rights in Data – If applicable, American Rivers and State retain rights to all final products, or any part thereof, produced as a result of this Project, including usage, reproduction, and publication.

American Rivers and State reserve all rights in copyright works created by Contractor in the performance of work under this Project.

17. Confidentiality of Data – All data, reports, information, inventions, improvements and discoveries used, compiled, developed, processed, stored or created by Contractor using Confidential and/or Sensitive Information shall be treated as Confidential and/or Sensitive Information by Contractor.

No such data, reports, information, inventions, improvements or discoveries shall be released, published or made available to any person (except to State) without prior written approval from American Rivers.

18. Protection of Information – Contractor shall work with American Rivers to take all necessary measures to protect Confidential or Sensitive Information to which it gains access from unauthorized access (accidental or intentional), modification, destruction, or disclosure. These measures may include but are not limited to: password protection of electronic data, encrypted transmission of electronic data, and secure mailing and locked storage of paper and taped copies.

Such measures may also include establishment of secure workstations and maintenance of a secure workstation access log. Contractor shall also apply appropriate security patches and upgrades and keep virus software up-to-date on all systems on which Confidential or Sensitive Information may be used.

Contractor shall ensure that all media, including electronic media, containing Confidential or Sensitive Information, to which they are given access are protected at the level of the most confidential or sensitive piece of data on the media. Contractor shall limit personnel allowed access to Confidential and Sensitive Information to those persons with a demonstrable business need for such access. Contractor shall maintain a current list of all personnel with access to Confidential and Sensitive Information.

19. Indemnification – This Contract is a contract for design professional services subject to California Civil Code Section 2782.8(a) and Contractor is a design professional as defined in California Civil Code Section 2782.8(b)(2). Contractor shall hold harmless, defend and indemnify the City, its officers, agents, employees, and volunteers from and against any and all claims, damages, losses, and expenses including attorneys’ fees arising out of, or pertaining to, or relating to the negligence, recklessness, or willful misconduct of the Contractor, except where caused by the active negligence, sole negligence, or willful misconduct of the City. To the fullest extent permitted by law, Contractor shall immediately defend and indemnify the City and its officers, agents, employees, and volunteers from and against any and all liabilities, regardless of nature or type, that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Contractor, or its employees, agents, or subcontractors. Liabilities subject to the duties to defend and indemnify include, without limitation, any and all claims, losses, damages, penalties, fines, and judgments; associated investigation and administrative expenses; defense costs, including but not limited to reasonable attorneys’ fees; court costs; and costs of alternative dispute resolution.

Contractor’s obligation to General Conditions/EJ/TE 01-19-11 7 of 13 indemnify applies unless it is finally adjudicated that the liability was caused by the sole active negligence or sole willful misconduct of an indemnified party.

20. Intellectual Property – If anything resulting from activities supported by this Contract is patentable, trademarkable, copyrightable, or otherwise legally protectable, City reserves the exclusive right to seek such Intellectual Property rights. Contractor will work with American Rivers to ensure that City can secure these rights.

Page 16 of 16 ends

DocuSign Envelope ID: B7ACCE96-C424-4895-8242-44B9540D1759 DocuSign Envelope ID: 2FE08130-C1C2-44B2-80E2-C5C57703B17D DocuSign Envelope ID: A19EB526-6F3D-4776-8C54-97A6A8F93E06 706

Page 1 of 13 ends

AGREEMENT BETWEEN
AMERICAN RIVERS, INC. AND THE WATERSHED PROJECT
American Rivers, Inc. ("American Rivers") and The Watershed Project (“Contractor”) hereby agree as follows:

1. Parties. This professional services agreement (the “Agreement”) is made and concluded by American Rivers, a nonprofit corporation organized and existing under the laws of the District of Columbia, having its principal business address at 1101 14th Street, N.W., Suite 1400, Washington, D.C. 20005 and Contractor, a corporation having its principal business address at 1327 South 46th Street, Building 155, Richmond, CA 94804.

2. Work Plan. Contractor agrees to perform the work as outlined in the attached Scope of Work (“Attachment A”) which is hereby incorporated by reference and made a part of this Agreement.

3. Project Management. The following individuals are designated as project managers for their respective parties:

Contractor: Juliana Gonzalez
1327 South 46th Street
Building 155
Richmond, CA 94804
Phone: (510) 665-3430
E-mail: [email protected]
American Rivers: Sarah Puckett
Director, California Central Valley River Conservation
1832 Second Street, Berkeley, CA 94710
Phone: (415) 203-3766
E-mail: [email protected]

4. Budget and Payment Terms. American Rivers will pay Contractor as set out in the Scope of Work. American Rivers must receive a completed W-9 from Contractor before any payments can be processed. American Rivers will pay all approved invoices within 30 days of receipt.

5. Company Information. Pursuant to this Agreement, Contractor will use and obtain company information concerning American Rivers. Such “Company Information” includes, but is not limited to: mailing lists, reports, files, memoranda, records and software, computer, and other physical personal property, which Contractor has or will receive or prepare or help to prepare in connection with this project. Contractor will not retain any copies, duplicates, reproductions or excerpts thereof.

6. Confidentiality. In the course of this project, Contractor will acquire confidential information. The term "Confidential Information" as used in this Agreement includes, without limitation, (a) Company Information as defined in Section 5 of this Agreement; (b) information received from third parties under confidential conditions, and (c) other technical, business or financial information or trade secrets, the use or disclosure of which might reasonably be construed to be contrary to the best interests of American Rivers. Contractor understands and agrees that such Confidential Information is disclosed to Contractor in confidence and solely for the use of American Rivers. Contractor acknowledges that Contractor has no ownership right or interest in any Confidential Information used or DocuSign Envelope ID: B7ACCE96-C424-4895-8242-44B9540D1759 DocuSign Envelope ID: 2FE08130-C1C2-44B2-80E2-C5C57703B17D DocuSign Envelope ID: A19EB526-6F3D-4776-8C54-97A6A8F93E06 707

Page 2 of 13 ends

developed during the course of this work. Contractor understands and agrees to (a) keep such Confidential Information confidential at all times after the completion of work with American Rivers, and (b) not make use of the Confidential Information for Contractor’s own behalf or on behalf of any third party.

7. Ownership of Intellectual Property. Materials prepared or delivered by Contractor to American Rivers under the terms of this Agreement (“Work”) shall be works made for hire created for and owned by American Rivers and/or the City of Richmond. To the extent that any material does not constitute work made for hire as a matter of law, Contractor hereby grants and assigns to American Rivers exclusive rights to the material under United States intellectual property law and all international conventions, including without limitation, copyrights, trade secrets, and patents in and to such materials and the right to copyright the material and any renewals thereof in the name of American Rivers. Contractor also hereby assigns to American Rivers and/or waives any and all claims that Contractor may now or hereafter have in any jurisdiction to so-called “moral rights” in connection with the Work. Contractor shall secure the same agreement from all independent contractors performing services in connection with Contractor’s performance under this Agreement. Contractor warrants that it is the sole creator of the Work except for such material from copyrighted sources as is reproduced by written permission of the copyright owner, and that the Work: (i) is original (except for such material from copyrighted sources as is reproduced by written permission of the copyright owner); (ii) contains no matter that is scandalous, obscene or libelous or otherwise contrary to law; and (iii) contains only information and data that is true and accurate to the best of Contractor’s knowledge, belief, and expertise.

Notwithstanding the foregoing, Contractor may, working with American Rivers and American Rivers receiving City of Richmond's prior written consent, seek patent, trademark, copyright or other intellectual property rights on anything resulting from activities supported by this Contract. However, American Rivers and the City of Richmond reserves and Contractor irrevocably grants, a nonexclusive, fully paid-up, royalty-free, assumable, perpetual, worldwide license, with the right to transfer, sublicense, practice and exploit said license and the right to make, have made, copy, modify, make derivative works of, use, sell, import, and otherwise distribute under all applicable intellectual properties without restriction of any kind said license. If required by the City of Richmond and at its expense, Contractor further agrees to assist, in every proper way to secure such intellectual property rights with respect thereto.

8. Termination without Cause. American Rivers may cancel this Agreement, at any time and without cause, by giving the Contractor fifteen (15) calendar days’ written notice of cancellation. In the event of termination of this Agreement for a reason other than Contractor’s default, American Rivers shall pay Contractor for (i) all services rendered and all reimbursable costs incurred by Contractor up to the date of receipt of notice of termination, and (ii) all direct and documented expenses reasonably incurred by Contractor in connection with the orderly termination of this Agreement, as determined by American Rivers in its sole discretion. In no event shall American Rivers be liable for any indirect, special or consequential expenses incurred by Contractor or its subconsultants, including, but not limited to, lost profits, overhead, margin, or intangible costs.

9. Termination for Lack of Funding. Should the primary source of funding for this project be reduced, deleted or delayed by the federal or state budget process or other budget control actions, and the work under this agreement is canceled or suspended, American Rivers shall provide written notice to Contractor and be liable for any work completed pursuant to the DocuSign Envelope ID: B7ACCE96-C424-4895-8242-44B9540D1759 DocuSign Envelope ID: 2FE08130-C1C2-44B2-80E2-C5C57703B17D DocuSign Envelope ID: A19EB526-6F3D-4776-8C54-97A6A8F93E06 708

Page 3 of 13 ends

Task Order up to the date of receipt of the written notice and shall have no liability for payment for work undertaken after such date.

10. Termination with Cause. In the event that one of the parties is in default as defined below, the non-breaching party may, in its sole reasonable discretion, immediately cancel the Agreement without penalty by giving the breaching party written notice of such cancellation which shall not excuse breaches of this Agreement that already may have occurred.

A. Contractor Default: Default on the part of Contractor shall include, without being limited to, the occurrence of any of the following events:
(i) failure by Contractor to comply with any of the provisions of this Agreement in a satisfactory manner as reasonably determined by American Rivers and failure to cure such violation within five (5) calendar days after receipt of written notice of said violation; or
(ii) Contractor becomes listed on the federal government’s list of parties excluded from receiving Federal contracts, certain subcontracts, and certain Federal financial and nonfinancial assistance and benefits, pursuant to the provisions of 31 U.S.C. 6101, note, E.O. 12549, E.O. 12689, 48 CFR 9.404, and each agency's codification of the Common Rule for Nonprocurement suspension and debarment (www.sam.gov -- System for Award Management (SAM)); or
(iii)filing by Contractor of a voluntary petition under any bankruptcy, reorganization, insolvency, or any other law for the relief of, or relating to debtors; the filing against Contractor of an involuntary petition in bankruptcy or a receiver or trustee is appointed to take possession of Contractor’s property, any of Contractor’s property is subjected to levy, seizure, assignment, application or sale for or by any creditor or governmental agency, and such action is not dismissed within thirty (30) calendar days thereafter; or Contractor becomes insolvent; or
(iv) dissolution of Contractor voluntarily, involuntarily or by operation of law; or (v) assignment of this Agreement by Contractor to any other entity without the prior written consent of American Rivers.

B. American Rivers Default: Default on the part of American Rivers shall include, without being limited to, the occurrence of any of the following events:
(i) failure by American Rivers to make approved payments to Contractor within sixty (60) business days after receipt of written notice from Contractor of failure to comply with the payment specifications described in this Agreement; or (ii) dissolution of American Rivers voluntarily, involuntarily or by operation of law.

11. Time is of the Essence. Time is of the essence for this Contract and American Rivers and Contractor agree that any time period set forth in Attachment A represents their best estimates with respect to completion dates. However, both American Rivers and Contractor acknowledge that departures from the schedule may occur and will make reasonable efforts to notify the other party of changes to the schedule. Further, neither American Rivers nor Contractor shall be responsible for any delay in performance arising from any event that is not caused by and is beyond the reasonable control of the nonperforming Party, regardless of whether the event was foreseeable. Such events include, but are not limited to, force majeure events such as natural disasters, pandemics, action or inaction by a government entity, an accident such as a fire or explosion not due to the negligence of the Party seeking to be excused, war, acts of terrorism including threats of terrorism, a riot, or unusually severe weather. The Party affected by the event shall provide notice of the delay in writing to the DocuSign Envelope ID: B7ACCE96-C424-4895-8242-44B9540D1759 DocuSign Envelope ID: 2FE08130-C1C2-44B2-80E2-C5C57703B17D DocuSign Envelope ID: A19EB526-6F3D-4776-8C54-97A6A8F93E06 709

Page 4 of 13 ends

other Party no later than (7) calendar days after the Party has knowledge that a delay has, will, or may occur. Following the occurrence of such an event, American Rivers and Contractor shall confer to determine the best course of action for resuming the Work and setting new performance timelines. Both American Rivers and Contractor shall, at all times, take reasonable steps within their respective powers and consistent with best practices to:
(a) Prevent force majeure events from affecting the performance of their obligations under this Agreement
(b) Mitigate the effects of force majeure events; and
(c) Timely comply with their obligations under this Agreement.

12. Nonassignability. This Agreement may not be assigned to any other entity or person without the express written consent of American Rivers.

13. Indemnification. Contractor agrees to indemnify and to hold American Rivers, the City of Richmond, and each entity’s directors, officers, employees, and agents harmless from and against all claims, actions, damages, liabilities, demands, costs, and expenses, including reasonable attorney fees, resulting from or attributable to any act within the scope of this Agreement by Contractor, its employees, or agents (i) in violation of any of the provisions of this Agreement, or (ii) in violation of any law, rule, or regulation of the United States or its agencies or of any state or its agencies, or (iii) resulting from the negligence or willful misconduct of Contractor. The foregoing indemnity provision shall survive and remain in full force and effect following termination of this Agreement for any such act occurring during the initial term or any renewal term of this Agreement.

American Rivers agrees to indemnify and to hold Contractor, its directors, officers, employees, and agents harmless from and against all claims, actions, damages, liabilities, demands, costs, and expenses, including reasonable attorney fees, resulting from or attributable to any act within the scope of this Agreement by American Rivers, its employees, or agents (i) in violation of any of the provisions of this Agreement, or (ii) in violation of any law, rule, or regulation of the United States or its agencies or of any state or its agencies, or (iii) resulting from the negligence or willful misconduct of American Rivers. The foregoing indemnity provision shall survive and remain in full force and effect following termination of this Agreement for any such act occurring during the initial term or any renewal term of this Agreement.

14. Insurance. Contractor and its subcontractor(s) shall obtain and maintain for the Term of this Agreement, usual and customary policies of insurance; Workers’ Compensation in the maximum amounts required by law; Automobile Liability with bodily injury limits of at least $1,000,000.00 per accident for bodily injury and property damage.; and Commercial General Liability (CGL) insurance in the amount of $2,000,000 per occurrence for bodily injury, personal injury and property damage, and Worker’s Compensation as required by law with Employer’s Liability of no less than $1,000,000. All policies shall be with insurers admitted to transact business in the State of California and having a current Best's rating of "A:VII" or better, and shall name American Rivers, Inc., Contra Costa County, the State of California and City of Richmond, and their respective elective and appointive boards, commissions, officers, agents, employees, and volunteers as additional insureds. Contractor’s policy shall cover the additional insureds with respect to liability arising out of automobiles owned, leased, hired or borrowed by or on behalf of the Contractor; and with respect to liability arising out of work or operations, including completed operations, performed by or on behalf of the Contractor including materials, parts or equipment furnished in connection with the work or operations.

DocuSign Envelope ID: B7ACCE96-C424-4895-8242-44B9540D1759 DocuSign Envelope ID: 2FE08130-C1C2-44B2-80E2-C5C57703B17D DocuSign Envelope ID: A19EB526-6F3D-4776-8C54-97A6A8F93E06 710

Page 5 of 13 ends

Such policies shall state "insurance is primary and all other insurance shall be noncontributory", shall waive all rights of subrogation against the additional insureds; and shall also contain a provision that American Rivers shall be notified in writing thirty (30) days before the policies may be canceled or allowed to expire or any reduction in coverage. include American Rivers and the State of California as an additional insured under its CGL policy, and provide American Rivers with a copy of the Endorsement.

Delivery of this Endorsement to American Rivers shall be a condition precedent to the first payment to Contractor. The insurance policies shall also contain a provision by which the insurer agrees that such policy shall not be canceled except after thirty (30) days written notice to American Rivers.

15. Right of Entry. Contractor shall coordinate with American Rivers, in obtaining the right to enter the property where the Work is to be performed.

16. Compliance.

A. Throughout the term of the Agreement, Contractor and its subcontractors shall comply with all rules indicated in the Attachment B, terms and conditions imposed by the funder(s) of this project.

B. Contractor shall comply with all federal, state and local laws, applicable statutes, Executive Orders, Office of Management and Budget circulars, and terms and conditions of the applicable source of funding for this Agreement, and regulations in effect, or reasonably expected to be in effect, including but not limited to, environmental laws and regulations, as of the date of completion of the Agreement.

C. Design changes made necessary by newly enacted laws, codes and regulations after this date shall entitle Contractor to a reasonable adjustment in the Project schedule and additional compensation as necessary to complete the tasks outlined in the Task Order affected by such newly enacted laws, codes and regulations.

17. Warranty. All supervisors, employees, subcontractors and authorized representatives assigned to perform services under this Agreement shall be fully qualified and specially trained in their respective responsibilities and shall perform the assigned services with care and diligence.

Contractor represents and warrants that all of Contractor’s services, including the estimate of cost, the setting of the schedule, and all work performed by subcontractors shall be performed in a professional and workmanlike manner.

18. Safety Precautions and Protection of Property. Contractor shall plan and conduct the work to safeguard its staff and property from injury. Contractor shall direct performance of work in compliance with reasonable safety and work practices and applicable federal, state, and local laws, rules, and regulations including, but not limited to, occupational safety and health standards. Contractor shall follow any site-specific safety plans, as may be required by state and local government during the global pandemic caused by the Covid-19 virus. Neither the issuance of special instructions by American Rivers nor the adherence thereto by Contractor shall relieve Contractor of the sole responsibility to maintain safe and efficient working conditions. Should a death, serious personal injury, or substantial property damage occur in connection with the performance of this Contract, Contractor shall notify American Rivers immediately.

19. Applicable Law. This Agreement will be governed by the laws of the State of California and any action relating to this Agreement shall be instituted and prosecuted in the courts of Contra Costa County, California. This Agreement can be amended only by a written DocuSign Envelope ID: B7ACCE96-C424-4895-8242-44B9540D1759 DocuSign Envelope ID: 2FE08130-C1C2-44B2-80E2-C5C57703B17D DocuSign Envelope ID: A19EB526-6F3D-4776-8C54-97A6A8F93E06 711

Page 6 of 13 ends

amendment signed by American Rivers and Contractor.

20. Legal Relationship of Parties. Nothing in this Agreement shall be construed as constituting a partnership, joint venture, employment relationship, agent/principal relationship, or other association of any kind, between the parties hereto, and neither party shall have the power to obligate or bind the other party in any manner whatsoever.

21. Conflict of Interest. Contractor agrees to notify American Rivers of any potential conflict of interest and/or related party transaction that could occur as a result of performance of the contract. Notification should be sent to American Rivers’ primary business address to the attention of the Office of the General Counsel.

22. Merger and Modification. This Agreement contains the entire agreement between the parties and any previous agreement is merged into this Agreement. This Agreement may be modified only by subsequent written agreement signed by both parties.

23. Survival of Certain Provisions. Any rights or remedies accruing to a party hereto after the termination or cancellation of this Agreement, including, without limitation, the provisions regarding Indemnification, Confidentiality, and Company Information shall survive such termination or cancellation.

DocuSign Envelope ID: B7ACCE96-C424-4895-8242-44B9540D1759 DocuSign Envelope ID: 2FE08130-C1C2-44B2-80E2-C5C57703B17D DocuSign Envelope ID: A19EB526-6F3D-4776-8C54-97A6A8F93E06 712

Page 7 of 13 ends

ACCEPTED AND AGREED:

American Rivers, Inc. The Watershed Project
BY: BY:

PRINTED
Kristin M. May NAME:

Chief Financial Officer TITLE:

DATE: DATE:

DocuSign Envelope ID: B7ACCE96-C424-4895-8242-44B9540D1759 DocuSign Envelope ID: 2FE08130-C1C2-44B2-80E2-C5C57703B17D DocuSign Envelope ID: A19EB526-6F3D-4776-8C54-97A6A8F93E06 713

Page 8 of 13 ends

ATTACHMENT A

SCOPE OF WORK

1. Work to be performed:

The Watershed Project (TWP) will support American Rivers (AR) in implementing the tasks and deliverables in the California Natural Resources Agency (CNRA) Urban Flood Protection grant to the City of Richmond for the Flood Risk Reduction in the Rheem Creek Watershed project to restore Rheem Creek to address creek overflows and flooding in the Rollingwood community.

Task 1. DIRECT PROJECT MANAGEMENT & ADMINISTRATION
TWP will help AR manage the CNRA Flood Risk Reduction in the Rheem Creek Watershed grant, including preparing and submitting invoices to AR, designing signage, conducting pre and post construction monitoring, and leading community outreach and engagement.

Responsibilities:
• Sign contract between TWP and AR
• Prepare and submit invoices to AR
• Design one interpretive sign
• Work with the City of Richmond to design one funding acknowledgement sign • Pre and post (five years) project construction monitoring of creek water quality, sediment flow, and plant survival and establishment
• Lead community outreach and engagement and work with community partners to keep residents informed about the final design and planned construction activities Task 3. GREENING/REVEGETATION
TWP will supplement the contractor’s planting/vegetation by obtaining additional plants that are not a part of the landscape contract, which they will work with Urban Tilth and other community partners to install as part of workforce development and community engagement.

Responsibilities:
• Obtain additional plants not associated with landscape contractor • Work with Urban Tilth and other community partners to oversee installation of plants as part of workforce development and community engagement

2. Term:

July 1, 2022 – March 1, 2024
DocuSign Envelope ID: B7ACCE96-C424-4895-8242-44B9540D1759 DocuSign Envelope ID: 2FE08130-C1C2-44B2-80E2-C5C57703B17D DocuSign Envelope ID: A19EB526-6F3D-4776-8C54-97A6A8F93E06 714

Page 9 of 13 ends

3. Budget:

Not to exceed $110,000
Task Project Element
Urban Flood
Protection
Grant

1.00 Non-Construction Costs - Direct Project Management & Administration

1.04 Interpretive Sign Design $ 3,000.00

1.09 Monitoring of water quality and sediment flow (pre & post) $ 27,000.00

1.10 Community Outreach and Engagement $ 50,000.00
$ 80,000.00

3.00 Greening / Revegetation

3.02 Plants to be installed by volunteers $ 5,000.00

3.05 Planting Oversight $ 25,000.00
SUBTOTAL $ 30,000.00
TOTAL $ 110,000.00
This is an estimate of how funding will be allocated by task. Contractor will not exceed the total contract amount, but funding allocated within each task may change. Any changes may require an informal or formal amendment from California Natural Resources Agency.

Mileage will be reimbursed at the Internal Revenue Service Standard Mileage Rates. After July 1, 2022, the rate is $0.625/mile. All mileage and other expenses will be included in the total contracted amount.

American Rivers must receive or have on file a completed W-9 and insurance documentation from Contractor before payment can be processed.

Contractor shall invoice American Rivers quarterly as certain work and deliverables are completed. Invoices shall describe the activities used in support of this Agreement in the relevant quarter. American Rivers shall pay the undisputed portion of invoices within thirty (30) calendar days after receipt of invoice. All invoices must include: 1) the total contract amount, 2) less previous invoice(s) amounts, 3) less the current invoice amount, 4) total amount of contract remaining, and 5) evidence of any match fulfilled with during that invoicing period.

DocuSign Envelope ID: B7ACCE96-C424-4895-8242-44B9540D1759 DocuSign Envelope ID: 2FE08130-C1C2-44B2-80E2-C5C57703B17D DocuSign Envelope ID: A19EB526-6F3D-4776-8C54-97A6A8F93E06 715

Page 10 of 13 ends

ATTACHMENT B

COMPLIANCE PROVISIONS
The following provisions apply to this Agreement because this Agreement is funded in whole or in part by State of California (State) and the City of Richmond (“City”) funds.

1. Air and Water Law Compliance – Under the State laws, the Contractor shall not be: (1) in violation of any order or resolution not subject to review promulgated by the State Air Resources Board or an air pollution control district; (2) subject to cease and desist order not subject to review issued pursuant to Section 13301 of the Water Code for violation of waste discharge requirements or discharge prohibitions; or (3) finally determined to be in violation of provisions of Federal law relating to air or water pollution.

2. Labor Compliance -- Contractor must comply with applicable California Labor Code requirements, including, but not limited to, Section 1720 et seq. of the California Labor Code regarding public works, limitations on use of volunteer labor (California Labor Code Section 1720.4) and payment of prevailing wages for work done and funded pursuant to this Project, including any payments to the Department of Industrial Relations under California Labor Code Section 1771.3.

3. Union Organizing – Contractor certifies that no request for reimbursement, or payment under this agreement, will seek reimbursement for costs incurred to assist, promote or deter union organizing.

4. Budget Contingency/Limit On State Funds – Should State funding for this project be reduced, deleted or delayed by the federal or state budget process or other budget control actions, and the work under this agreement is canceled or suspended, American Rivers shall provide written notice to Contractor and be liable for any work completed up to the date of receipt of the written notice and shall have no liability for payment for work undertaken after such date.

5. Acknowledgment – Contractor shall coordinate with American Rivers to include appropriate acknowledgement of credit to the State and to all cost-sharing partners for their support when promoting the Project or using any data and/or information developed under this Project.

6. Disclosure Agreement – Any document or written report prepared in whole or in part pursuant to this Agreement shall contain a disclosure statement indicating that the document or written report was prepared through support from Federal and State funding. Contractor shall coordinate with American Rivers in fulfilling this requirement.

7. Americans with Disabilities Act – By signing this Agreement, Contractor assures American Rivers that it complies with the Americans with Disabilities Act (ADA) of 1990, (42 U.S.C., 12101 et seq.), which prohibits discrimination on the basis of disability, as well as all applicable regulations and guidelines issued pursuant to the ADA.

8. Audits – American Rivers, City, and the State, or their designated representative, reserve the right to conduct an audit at any time until the completion of the Project, with the costs of such audit borne by auditing entity. Contractor shall allow auditor(s) access to relevant records during normal business hours and allow interviews of any employees who might reasonably have information related to such records. The records shall include, without limitation, evidence sufficient to reflect properly the amount, receipt, deposit, and disbursement of all funds related to the construction and implementation of the project, and the use, management, operation and maintenance of the real property. Time and effort reports are also required. The Contractor’s accounting and control DocuSign Envelope ID: B7ACCE96-C424-4895-8242-44B9540D1759 DocuSign Envelope ID: 2FE08130-C1C2-44B2-80E2-C5C57703B17D DocuSign Envelope ID: A19EB526-6F3D-4776-8C54-97A6A8F93E06 716

Page 11 of 13 ends

systems shall conform to generally accepted accounting principles. All records shall provide a breakdown of total costs charged under this Contract, including properly executed payrolls, time records, utility bills, invoices, and vouchers. Contractor shall preserve all records pertaining to the Project for this purpose for at least five (5) years after Project completion and until all Federal or State audits are complete and exceptions resolved for this contract’s funding period.

9. Inspection – City shall have the right to inspect the project or services without notice if they are being performed on City or other public property. If such project or services shall not be performed on City or other public property, City shall have the right to inspect such work upon reasonable notice.

10. Conflict of Interest – Contractor acknowledges, represents and warrants that Contractor shall avoid all conflicts of interest (as defined under any federal, state or local statute, rule or regulation, or at common law) with respect to this Contract. Contractor further acknowledges, represents and warrants that no City official or employee has any economic interest, as defined in Title 2, California Code of Regulations §§ 18703.1 through 18703.5, with Contractor that would invalidate this Contract. Contractor acknowledges that in the event that Contractor shall be found by any judicial or administrative body to have any conflict of interest (as defined above) with respect to this Contract, all consideration received under this Contract shall be forfeited and returned to City forthwith. This provision shall survive the termination of this Contract for one (1) year.

11. Independent Capacity – Contractor and its employees shall act in an independent capacity and not as officers, employees, or agents of the State for the duration of its performance of services under this Agreement.

12. Business and Professions Code – Contractor and its subcontractor(s) (if applicable) must comply with the Business and Professions Code, including, but not limited to, section 6700 et seq. (Professional Engineers Act) or section 7800 et seq. (Geologists and Geophysicists Act). Further, the Contractor will conduct all work consistent with the professional standards of the industry and type of work performed in the course of the Project. Contractor acknowledges, represents and warrants that Contractor and its employees are skilled and able to competently provide the services hereunder, and possess all professional licenses, certifications, and approvals necessary to engage in their occupations. City has relied upon the professional ability and training of Contractor as a material inducement to enter into this Contract. Contractor shall perform in accordance with generally accepted professional practices and standards of Contractor's profession. In the event that City, in its sole discretion, desires the removal of any person employed or retained by Contractor to perform services hereunder, such person shall be removed immediately upon receiving notice from City.

13. Drug-Free Workplace Certification -- By signing this Agreement. Contractor and its subcontractors hereby certify under penalty of perjury under the laws of State of California, compliance with the requirements of the Drug-Free Workplace Act of 1990 (Government Code 8350 et seq.) and that it will have or will provide a drug-free workplace by taking the following actions:
a. publish a statement notifying employees, and its subcontractors that unlawful manufacture, distribution, dispensation, possession, or use of a controlled substance is prohibited and specifying actions to be taken against employees, or subcontractors for violations as required by Government Code Section 8355(0). b) Establish a Drug-Free Awareness Program, as required by Government Code Section 8355
b. to inform employees or subcontractors about all of the following:

1. The dangers of drug abuse in the workplace,

2. Grantee's policy of maintaining a drug-free workplace, DocuSign Envelope ID: B7ACCE96-C424-4895-8242-44B9540D1759 DocuSign Envelope ID: 2FE08130-C1C2-44B2-80E2-C5C57703B17D DocuSign Envelope ID: A19EB526-6F3D-4776-8C54-97A6A8F93E06 717

Page 12 of 13 ends

3. Any available counseling, rehabilitation, and employee assistance programs, and

4. Penalties that may be imposed upon employees and subcontractors for drug abuse violations.
c. Provide as required by Government Code Sections 8355(c), that every employee, and/or subcontractor who works under this Agreement:

1. Will receive a copy of Contractor's drug-free policy statement, and

2. Will agree to abide by terms of Contractor's condition of employment, contract or subcontract.

14. Non-Discrimination – During the performance of this Agreement, Contractor and its subcontractors shall not unlawfully discriminate, harass, allow harassment against any employee or applicant for employment or deny benefits to any person because of sex, race, color, ancestry, religious creed, national origin, physical disability (including HIV and AIDS), mental disability, medical condition (cancer), genetic information, age (over 40), marital status, gender, gender identity, gender expression, sexual orientation, military and veteran status, denial of pregnancy disability leave or reasonable accommodation, and denial of family and medical care leave.

Contractor and subcontractors shall ensure that the evaluation and treatment of their employees and applicants for employment are free from such discrimination and harassment. Contractor and its subcontractors shall comply with the provisions of the Fair Employment and Housing Act (California Government Code Section 12990 (a-f) et seq.), the applicable regulations promulgated thereunder (California Code of Regulations, Title 2, Section 11000 et seq.), the provisions of Article 9.5, Chapter 1, Part 1, Division 3, Title 2 of the California Government Code (Gov. Code, § 11135-11139.5), and the regulations or standards adopted by the State Coastal Conservancy to implement such article. The applicable regulations of the Fair Employment and Housing Commission implementing California Government Code Section 12990 (a-f), set forth in Chapter 5 of Division 4 of Title 2 of the California Code of Regulations, are incorporated into this Agreement by reference and made a part hereof as if set forth in full. Contractor and its subcontractors shall give written notice of their obligations under this clause to labor organizations with which they have a collective bargaining or other agreement.

15. Compliance with City Laws – Contractor shall comply with all provisions of the Richmond Municipal Code (“Municipal Code”). Contractor acknowledges that under § 2.60.070 of the Municipal Code ("Living Wage Ordinance"), Contractor shall promptly provide to American Rivers documents and information verifying its compliance with the Living Wage Ordinance. Also as prescribed in § 2.60.070, Contractor shall notify each of its affected employees with regards to the wages that are required to be paid pursuant to the Living Wage Ordinance. Contractor shall comply with § 2.28.030 of the Municipal Code, obligating every Contractor or subcontractor under a contract or subcontract with the City for public work or for goods or for services to refrain from discriminatory employment or subcontracting practices on the basis of race, color, sex, sexual orientation, religious creed, national origin or ancestry of any employee, any applicant for employment or any potential subcontractor. Contractor acknowledges that the City’s Drug Free Workplace Policy, Violence in the Workplace Policy and the Policy Against Workplace Harassment, are available on the City’s website at
http://www.ci.richmond.ca.us/workplacepolicies. Contractor agrees to abide by the terms and conditions of said policies.

16. Rights in Data – If applicable, American Rivers and State retain rights to all final products, or any part thereof, produced as a result of this Project, including usage, reproduction, and publication.

American Rivers and State reserve all rights in copyright works created by Contractor in the performance of work under this Project.

DocuSign Envelope ID: B7ACCE96-C424-4895-8242-44B9540D1759 DocuSign Envelope ID: 2FE08130-C1C2-44B2-80E2-C5C57703B17D DocuSign Envelope ID: A19EB526-6F3D-4776-8C54-97A6A8F93E06 718

Page 13 of 13 ends

17. Confidentiality of Data – All data, reports, information, inventions, improvements and discoveries used, compiled, developed, processed, stored or created by Contractor using Confidential and/or Sensitive Information shall be treated as Confidential and/or Sensitive Information by Contractor.

No such data, reports, information, inventions, improvements or discoveries shall be released, published or made available to any person (except to State) without prior written approval from American Rivers.

18. Protection of Information – Contractor shall work with American Rivers to take all necessary measures to protect Confidential or Sensitive Information to which it gains access from unauthorized access (accidental or intentional), modification, destruction, or disclosure. These measures may include but are not limited to: password protection of electronic data, encrypted transmission of electronic data, and secure mailing and locked storage of paper and taped copies.

Such measures may also include establishment of secure workstations and maintenance of a secure workstation access log. Contractor shall also apply appropriate security patches and upgrades and keep virus software up-to-date on all systems on which Confidential or Sensitive Information may be used.

Contractor shall ensure that all media, including electronic media, containing Confidential or Sensitive Information, to which they are given access are protected at the level of the most confidential or sensitive piece of data on the media. Contractor shall limit personnel allowed access to Confidential and Sensitive Information to those persons with a demonstrable business need for such access. Contractor shall maintain a current list of all personnel with access to Confidential and Sensitive Information.

19. Intellectual Property – If anything resulting from activities supported by this Contract is patentable, trademarkable, copyrightable, or otherwise legally protectable, City reserves the exclusive right to seek such Intellectual Property rights. Contractor will work with American Rivers to ensure that City can secure these rights.

DocuSign Envelope ID: B7ACCE96-C424-4895-8242-44B9540D1759 DocuSign Envelope ID: 2FE08130-C1C2-44B2-80E2-C5C57703B17D DocuSign Envelope ID: A19EB526-6F3D-4776-8C54-97A6A8F93E06 719

CITY OF RICHMOND

CONTRACT AMENDMENT
Department: Project Manager:

Project Manager E-mail: Project Manager Phone No:

P.R. No: Vendor No: Contract No32:

Description of Services:

Amendment No. ___ modifies the: (2nd or subsequent amendments attach Amendment History page)

Term, Payment Limit and Service Plan
Payment Limit and Service Plan

Term and Service Plan
Service Plan
The parties to this Contract Amendment do mutually agree and promise as follows:

1. Parties. The parties to this Contract Amendment are the City of Richmond, California, a municipal corporation (City), and the following named Contractor:

Company Name:

Street Address:

City, State, Zip Code:

Contact Person:

Telephone: Email:

Business License No: / Expiration Date:

A California [ ] corporation, [ ] limited liability corporation [ ] general partnership, [ ] limited partnership, [ ] individual, [ ] non-profit corporation, [ ] individual dba as [specify:]
[ ] other [specify:]

2. Purpose. This Contract Amendment is being entered into to amend the Contract between City and Contractor which was approved by the City Council of the City of Richmond or executed by the City Manager on , which original term commenced on and terminates with an original
contract payment limit of $ . Said contract shall hereinafter be referred to as the "Original Contract" and is incorporated herein by reference.

3. Original Contract Provisions. The parties hereto agree to continue to abide by those terms and conditions of the Original Contract, and any amendments thereto, which are unaffected by this Contract Amendment.

Public Works Jeffrey Barich [email protected] 412-2009 6264 Sole source contract for the Flood Risk Reduction in Rheem Creek Watershed Project ✔
1 American Rivers Inc. 1832 Second Street Berkeley, CA 94710 Sarah Puckett (415) 203-3766 [email protected] 40063052 December 31, 2024 ✔ July 19, 2022 July 1, 2022 March 1, 2024 300,500.00
DocuSign Envelope ID: 7D97C573-BAAF-4014-BBB5-15BE0B553FAD DocuSign Envelope ID: 04695384-FA4D-4507-B2D3-DB2CD0046943 720
Contract Amendment/EJ/TE 09-26-07

4. Amendment Provisions. This Contract Amendment is subject to the Amendment Provisions attached hereto, which are incorporated herein by reference, and which control over any conflicting provisions of the Original Contract, or any amendment thereto.

5. City of Richmond Business License Active Status Maintained. Pursuant to Municipal Code Section 7.04.030, the Contractor must maintain its City of Richmond business license for this Contract Amendment to be deemed to be in effect.

6. Insurance Coverage Updated and Maintained. Pursuant to the Original Contract, the Contractor shall provide the City with updated insurance certificates, and the Contractor shall maintain insurance coverage, for this Contract Amendment to be deemed to be in effect.

7. Signatures. These signatures attest the parties’ agreement hereto:

CITY OF RICHMOND, CALIFORNIA
a municipal corporation
By _______________________
Title:

I hereby certify that the Original Contract
and this Amendment have been approved
by the City Council or executed by the City
Manager.

By _______________________
City Clerk
Approved as to form:

By_______________________
City Attorney
List of Attachments:

1. Amendment Provisions

2. Updated Insurance Certificates
CONTRACTOR:
______________________________
(*The Corporation Chairperson of the Board, President or Vice-President should sign on the line below.)
By____________________________
Title:________________________
(*The Corporation Chief Financial Officer, Secretary or Assistant Secretary should sign on the line below.)
By:___________________________
Title:________________________
(NOTE: Pursuant to California Corporations
Code Section 313, if Contractor is a
corporation or nonprofit organization, this
Contract (1) should be signed by the
Chairperson of the Board, President or
Vice-President and the Chief Financial
Officer, Secretary or Assistant Secretary; (2)
should have both signatures conform to
designated representative groups pursuant
to Corporations Code Section 313.

American Rivers Inc.

DocuSign Envelope ID: 7D97C573-BAAF-4014-BBB5-15BE0B553FAD CFO
CEO
DocuSign Envelope ID: 04695384-FA4D-4507-B2D3-DB2CD0046943 Director of Public Works
City Manager
3/15/2024
721
Contract Amendment between the City of Richmond and
Amendment No. Contract No.32

AMENDMENT PROVISIONS (TERM AND SERVICE PLAN)

1. Paragraph 2 (Term) of the Original Contract is hereby amended to extend the Contract term. Paragraph 2 of the Original Contract is amended to read as follows:
"2. Term. The effective date of this Contract is
_____________________________________________________________ (Insert original contract commencement date)
and it terminates
_____________________________________________________________. (Insert new contract termination date)
unless sooner terminated as provided herein."

2. The Service Plan (Exhibit A) of the Original Contract is hereby amended to include the following tasks and/or services:

Contract Amendment/EJ/TE 9-26-07
American Rivers Inc.
1 6264 July 1, 2022 11/15/2026
None
DocuSign Envelope ID: 7D97C573-BAAF-4014-BBB5-15BE0B553FAD DocuSign Envelope ID: 04695384-FA4D-4507-B2D3-DB2CD0046943 722
Contract Amendment between the City of Richmond and
Amendment No. Contract No.32

AMENDMENT PROVISIONS (AMENDMENT HISTORY)
The first Contract Amendment was approved by City Council of the City of Richmond or executed by the City Manager on for one or more of the
following provisions (check those that apply):

Increased contract payment limit by $ ________________for a payment limit not to exceed $ _________________________.

Term Amendment (insert new termination date):________________________

Service Plan
The second Contract Amendment was approved by City Council of the City of Richmond or executed by the City Manager on for one or more of the following provisions (check those that apply):

Increased contract payment limit by $ ________________for a payment limit not to exceed $ _________________________.

Term Amendment (insert new termination date):________________________

Service Plan
The third Contract Amendment was approved by City Council of the City of Richmond or executed by the City Manager on for one or more of the
following provisions (check those that apply):

Increased contract payment limit by $ ________________for a payment limit not to exceed $ _________________________.

Term Amendment (insert new termination date):________________________

Service Plan
The fourth Contract Amendment was approved by City Council of the City of Richmond or executed by the City Manager on for one or more of the following provisions (check those that apply):

Increased contract payment limit by $ ________________for a payment limit not to exceed $ _________________________.

Term Amendment (insert new termination date):________________________

Service Plan
The fifth Contract Amendment was approved by City Council of the City of Richmond or executed by the City Manager on for one or more of the
following provisions (check those that apply):

Increased contract payment limit by $ ________________for a payment limit not to exceed $ _________________________.

Term Amendment (insert new termination date):________________________

Service Plan
American Rivers Inc.
1 6264 300,500.00 ✔ 11/15/2026 300,500.00 300,500.00 300,500.00 300,500.00 DocuSign Envelope ID: 7D97C573-BAAF-4014-BBB5-15BE0B553FAD DocuSign Envelope ID: 04695384-FA4D-4507-B2D3-DB2CD0046943 723
___ Exhibit F
___ Section 8
City of Richmond - Insurance Requirements – Type 1:

Consultants and Contractors
Type 1 – Page 1 of 4
Revised: September 2011
In all instances where a CONTRACTOR or its representatives will be conducting business and/or providing services, the City requires the following MINIMUM insurance requirements and limits.

CONTRACTOR shall procure and maintain for the duration of the contract, agreement, or other order for work, services or supplies, insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder and the results of that work by the CONTRACTOR, its agents, representatives, employees or subcontractors. Maintenance of proper insurance coverage is a material element of the contract. Failure to maintain or renew coverage or to provide evidence of renewal may be treated by the City as a material breach of contract.

CONTRACTOR agrees that in the event of loss due to any of the perils for which it has agreed to provide Commercial General Liability insurance, CONTRACTOR shall look solely to its insurance for recovery. CONTRACTOR hereby grants to CITY, on behalf of any insurer providing Commercial General Liability insurance to either CONTRACTOR or CITY with respect to the services of CONSULTANT herein, a waiver of any right to subrogation which any such insurer of said CONTRACTOR may acquire against the CITY by virtue of the payment of any loss under such insurance.

Original, signed certificates and original, separate policy endorsements, naming the City as an additional insured for general liability, as well as a waiver of subrogation for Workers’ Compensation insurance, shall be received and approved by the City before any work may begin. However, failure to do so shall not operate as a waiver of these insurance requirements.

City reserves the right to modify or require additional coverages for specific risk exposures depending on scope of CONTRACTORS work.

Minimum coverage is detailed below. The policy limits of coverage shall be made available to the full limits of the policy.

The minimum limits stated herein shall not serve to reduce the policy limits of coverage of CONTRACTOR.

Minimum Scope of Insurance – the following forms shall be provided and coverage shall be at least as broad as the following:

1. Insurance Services Office Commercial General Liability coverage (ISO Occurrence Form CG 0001) including coverage for bodily and personal injury, property damage, and products and completed operations.

2. Insurance Services Office Automobile Liability coverage (ISO Form CA 0001, Code 1, Any Auto)

3. Original and Separate Additional Insured Endorsements for General Liability (ISO Form CG 20 10 11/85 or its equivalent) with primary and non-contributory language.

4. Workers’ Compensation Insurance as required by the State of California including Employer’s Liability coverage.

5. Original and Separate Waiver of Subrogation for Workers’ Compensation and Builder’s Risk/ Course of Construction Insurance.

6. Builder’s Risk/Course of Construction insurance covering all risks of loss less policy exclusions when the City of Richmond has a financial interest in the property. – (Only required for Construction Contracts involving property)

7. Contractor’s Pollution Liability (if applicable for Construction Contractors) Required Coverage Minimum Limits
Workers’ Compensation and
Employers’ Liability
Statutory limits as required by the State of California including $1 million Employers’ Liability per accident, per employee for bodily injury or disease.

If CONTRACTOR is self-insured, provide a certificate of Permission to SelfInsure, signed by the California Department of Industrial Relations and SelfInsurance. If contractor is a sole proprietor (has no employees) than contractor must sign “Contractor Release of Liability” found at:
http://www.ci.richmond.ca.us/index.aspx?nid=61.

DocuSign Envelope ID: 7D97C573-BAAF-4014-BBB5-15BE0B553FAD DocuSign Envelope ID: 04695384-FA4D-4507-B2D3-DB2CD0046943 724
___ Exhibit F
___ Section 8
City of Richmond - Insurance Requirements – Type 1:

Consultants and Contractors
Type 1 – Page 2 of 4
Revised: September 2011

PROJECT COST REQUIRED LIMIT
$0 - $5 million $2 million p/o
$5 million - $10 million $5 million p/o
Over $10 million $10 million p/o
Fireworks $5 million p/o
General Liability
(primary and excess limits
combined)

Includes coverage for bodily injury, personal injury, property damage and products and completed operations. The policy shall not exclude coverage for XCU perils (explosion, collapse, or damage to underground property).

If the policy includes a general aggregate, either the general aggregate shall apply separately to this project, service or location or the minimum required aggregate limit shall be twice the per occurrence limit ($4 million aggregate limit).

Policy shall be endorsed to name the City of Richmond as an additional insured per the conditions detailed below.

Automobile Liability $1,000,000 per occurrence for bodily injury and property damage.

Builders’ Risk/Course of
Construction – Covers property
under construction, repair or
renovation as well as equipment
and materials to be installed.
(Only required for Construction
Projects involving property and
equipment installation.)
Coverage shall include all risks of direct physical loss, excluding earthquake, for an amount equal to the full completed value of the covered structure or replacement value of alterations or additions, including soft costs and business interruption.

If the project does not involve new or major reconstruction, an Installation Floater may be acceptable. For such projects, a property installation floater shall be obtained that provides for the improvement, remodel, modification, alteration, conversion or adjustment to existing buildings, structures, processes, machinery and equipment. The Property Installation Floater shall provide property damage coverage for any building, structure, machinery or equipment damaged, impaired, broken or destroyed during the performance of the Work, including during transit, installation and testing at the City of Richmond’s site.

The City of Richmond shall be named as loss payee as its interest may appear. The insurer shall waive all rights of subrogation against City.

Contractor’s Pollution Liability (if
applicable)
Protects against:
unexpected/unintended release of
pollution resulting from contractors
covered operations such as:

HVAC, paving, carpentry, pipeline
& tank installation, drillers,
remediation contractors,
maintenance, mechanical,
demolition, excavation, grading,
street/road construction,
residential & commercial builders.

Same limits as General Liability.

Required Policy Conditions
A. M. Best Rating A:VII or Better. If the A.M. Best Rating falls below the required rating, CONTRACTOR must replace coverage immediately and provide notice to City.

Additional Insured Endorsement Applicable to General Liability Coverage.

The City of Richmond, its officers, officials, employees, agents and volunteers are to be named as additional insureds for all liability arising out of the operations by or on behalf of the named insured, including but not limited to bodily injury, deaths and property damage or destruction arising in any respect directly or indirectly in the performance of this contract.

ISO form CG 20 10 (11/85) or its equivalent is required. The endorsement must not exclude products and completed operations coverage. If it does, then CG 20 37 (10/01) is also required.

DocuSign Envelope ID: 7D97C573-BAAF-4014-BBB5-15BE0B553FAD DocuSign Envelope ID: 04695384-FA4D-4507-B2D3-DB2CD0046943 725
___ Exhibit F
___ Section 8
City of Richmond - Insurance Requirements – Type 1:

Consultants and Contractors
Type 1 – Page 3 of 4
Revised: September 2011
Additional Insured Endorsement
(continued)
SAMPLE Endorsements can be found at
http://www.ci.richmond.ca.us/index.aspx?nid=61
Primary and Noncontributory The contractor’s insurance coverage must be primary coverage as it pertains to the City, its officers, officials, employees, agents and volunteers. Any insurance or self insurance maintained by the City is wholly separate from the insurance of the contractor and in no way relieves the contractor from its responsibility to provide insurance.

Waiver of Subrogation
Endorsement Form
Contractor’s insurer will provide a Waiver of Subrogation in favor of the City for Workers Compensation and Builder’s Risk/ Course of Construction coverage during the life of this contract.

SAMPLE Endorsements can be found at
http://www.ci.richmond.ca.us/index.aspx?nid=61
Deductibles and Self-Insured
Retentions
Any deductible or self-insured retention must be declared to and approved by the City. At the option of the City either the insurer shall reduce or eliminate such deductibles or self-insured retention as respects the City or the CONTRACTOR shall procure a financial guarantee in an amount equal to the deductible or self-insured retention guaranteeing payment of losses and related investigations, claims administration and defense expenses.

Contractor is responsible for satisfaction of the deductible and/or self-insured retention for each loss.

Loss Payable Endorsement (only
required when Builder’s Risk
and/or Course of Construction
Insurance is required.)
Applicable to Builder’s Risk/Course of Construction naming the City of Richmond as Loss Payee.

SURETY BONDS
(If a Public Works/Engineering
Project)
The Contractor shall provide:

1. A Bid bond

2. A Performance Bond

3. A Payment Bond
Umbrella/Excess Liability Policies
If an Umbrella or Excess Liability Policy is used to meet the liability limits, coverage shall be as broad as specified for underlying coverages and cover those insured in the underlying policies.

Claims-Made Policies
If any insurance policy is written on a claims-made form: 1) the retroactive date must be shown, and must be before the date of the contract or the beginning of contract work. 2) Insurance must be maintained and evidence of insurance must be provided for at least five (5) years after completion of the contract of work. 3) If coverage is canceled or nonrenewed, and not replaced with another claims-made policy form with a retroactive date prior to the contract effective date, the Contractor must purchase an extended period coverage for a minimum of five (5) years after completion of contract work.

Subcontractors
CONTRACTOR shall include all subcontractors as insured under its policies or shall furnish to the City for review and approval, separate certificates and endorsements for each subcontractor. All coverage for subcontractors shall be subject to all of the requirements stated herein.

CONTRACTOR agrees to defend and indemnify the City of Richmond for any damage resulting to it from failure of either CONTRACTOR or any subcontractor to take out or maintain the required insurance policies. The fact that insurance is obtained by CONTRACTOR, and/or CONTRACTOR’s subcontractors, will not be deemed to release or diminish the liability of CONTRACTOR, including, without limitation, liability under the indemnity provisions of this contract. Damages recoverable by CITY from CONTRACTOR or any third party will not be limited by the amount of the required insurance coverage.

DocuSign Envelope ID: 7D97C573-BAAF-4014-BBB5-15BE0B553FAD DocuSign Envelope ID: 04695384-FA4D-4507-B2D3-DB2CD0046943 726
___ Exhibit F
___ Section 8
City of Richmond - Insurance Requirements – Type 1:

Consultants and Contractors
Type 1 – Page 4 of 4
Revised: September 2011
Verification of Coverage
All original certificates and endorsements shall be received and approved by the City before work may begin. The City of Richmond reserves the right to require complete, certified copies of all required insurance policies including endorsements affecting the coverage at any time.

Original insurance certificates and required policy endorsements shall be mailed, or delivered to the Designated Project Manager for the City of Richmond.

Insurance certificates and endorsements may be faxed to the Designated Project Manager. However, Contractor must mail the original certificates and endorsements to Designated Project Manager once faxed.

Continuous Coverage
CONTRACTOR shall maintain the required insurance for the life of the contract. Should the CONTRACTOR cease to have insurance as required during this time, all work by the CONTRACTOR pursuant to this agreement shall cease until insurance acceptable to the City is provided. In the event that CONTRACTOR fails to comply with the City’s insurance requirements, the City may take such action as it deems necessary to protect the City’s interests. Such action may include but is not limited to termination of the contract, withholding of payments, or other actions as the City deems appropriate.

If services or the scope of work extend beyond the expiration dates of the required insurance policies initially approved by the City, CONTRACTOR must provide updated certificates and endorsements indicating that the required coverage, terms and conditions are still in place. Renewal certificates and updated endorsements shall be mailed to the Designated Project Manager.

Cancellation
CONTRACTOR shall ensure that coverage shall not be cancelled, reduced or otherwise materially changed except after thirty (30) days’ prior written notice has been given to the City.

Reporting Requirements
Any failure to comply with reporting or other provisions of the policies including breaches of warranties shall not affect coverage provided to the City, its officers, officials, employees or volunteers.

Consistent with Public Policy
The insuring provisions, insofar as they may be judged to be against public policy shall be void and unenforceable only to the minimum extent necessary so that the remaining terms and provisions herein may be consistent with public policy and thus enforceable.

DocuSign Envelope ID: 7D97C573-BAAF-4014-BBB5-15BE0B553FAD DocuSign Envelope ID: 04695384-FA4D-4507-B2D3-DB2CD0046943 727

CITY OF RICHMOND

CONTRACT AMENDMENT
Department: Project Manager:

Project Manager E-mail: Project Manager Phone No:

P.R. No: Vendor No: P.O./Contract No:

Description of Services:

Amendment No. ___ modifies the: (2nd or subsequent amendments attach Amendment History page)

Term, Payment Limit and Service Plan
Payment Limit and Service Plan

Term and Service Plan
Service Plan
The parties to this Contract Amendment do mutually agree and promise as follows:

1. Parties. The parties to this Contract Amendment are the City of Richmond, California, a municipal corporation (City), and the following named Contractor:

Company Name:

Street Address:

City, State, Zip Code:

Contact Person:

Telephone: Email:

Business License No: / Expiration Date:

A California [ ] corporation, [ ] limited liability corporation [ ] general partnership, [ ] limited partnership, [ ] individual, [ ] non-profit corporation, [ ] individual dba as [specify:]
[ ] other [specify:]

2. Purpose. This Contract Amendment is being entered into to amend the Contract between City and Contractor which was approved by the City Council of the City of Richmond or executed by the City Manager on , which original term commenced on and terminates with an original
contract payment limit of $ . Said contract shall hereinafter be referred to as the "Original Contract" and is incorporated herein by reference.

3. Original Contract Provisions. The parties hereto agree to continue to abide by those terms and conditions of the Original Contract, and any amendments thereto, which are unaffected by this Contract Amendment.

728
Contract Amendment/EJ/TE 09-26-07

4. Amendment Provisions. This Contract Amendment is subject to the Amendment Provisions attached hereto, which are incorporated herein by reference, and which control over any conflicting provisions of the Original Contract, or any amendment thereto.

5. City of Richmond Business License Active Status Maintained. Pursuant to Municipal Code Section 7.04.030, the Contractor must maintain its City of Richmond business license for this Contract Amendment to be deemed to be in effect.

6. Insurance Coverage Updated and Maintained. Pursuant to the Original Contract, the Contractor shall provide the City with updated insurance certificates, and the Contractor shall maintain insurance coverage, for this Contract Amendment to be deemed to be in effect.

7. Signatures. These signatures attest the parties’ agreement hereto:

CITY OF RICHMOND, CALIFORNIA
a municipal corporation
By _______________________
Title:

I hereby certify that the Original Contract
and this Amendment have been approved
by the City Council or executed by the City
Manager.

By _______________________
City Clerk
Approved as to form:

By_______________________
City Attorney
List of Attachments:

1. Amendment Provisions

2. Updated Insurance Certificates
CONTRACTOR:
______________________________
(*The Corporation Chairperson of the Board, President or Vice-President should sign on the line below.)
By____________________________
Title:________________________
(*The Corporation Chief Financial Officer, Secretary or Assistant Secretary should sign on the line below.)
By:___________________________
Title:________________________
(NOTE: Pursuant to California Corporations
Code Section 313, if Contractor is a
corporation or nonprofit organization, this
Contract (1) should be signed by the
Chairperson of the Board, President or
Vice-President and the Chief Financial
Officer, Secretary or Assistant Secretary; (2)
should have both signatures conform to
designated representative groups pursuant
to Corporations Code Section 313.
729
Contract Amendment between the City of Richmond and
Amendment No. P.O./Contract No.

AMENDMENT PROVISIONS (PAYMENT LIMIT AND SERVICE PLAN)

1. Paragraph 3 (Payment Limit) of the Original Contract is hereby amended to increase the payment limit by $ . Paragraph 3 of the Original Contract is amended to read as follows:
"3. Payment Limit. City's total payments to Contractor under this Contract Amendment shall not exceed $ including expenses."
“The City of Richmond shall not pay for services that exceed the Contract Payment Limit without the prior written approval of the City Manager if the total Contract amount does not exceed $10,000 or without the prior approval of the City Council if the total Contract amount is over $10,000.”

2. The Service Plan (Exhibit A) of the Original Contract is hereby amended to include the following tasks and/or services:

Contract Amendment/EJ/TE 9-26-07
730
Contract Amendment between the City of Richmond and
Amendment No. P.O./Contract No.

AMENDMENT PROVISIONS (AMENDMENT HISTORY)
The first Contract Amendment was approved by City Council of the City of Richmond or executed by the City Manager on for one or more of the
following provisions (check those that apply):

Increased contract payment limit by $ ________________for a payment limit not to exceed $ _________________________.

Term Amendment (insert new termination date):________________________

Service Plan
The second Contract Amendment was approved by City Council of the City of Richmond or executed by the City Manager on for one or more of the following provisions (check those that apply):

Increased contract payment limit by $ ________________for a payment limit not to exceed $ _________________________.

Term Amendment (insert new termination date):________________________

Service Plan
The third Contract Amendment was approved by City Council of the City of Richmond or executed by the City Manager on for one or more of the
following provisions (check those that apply):

Increased contract payment limit by $ ________________for a payment limit not to exceed $ _________________________.

Term Amendment (insert new termination date):________________________

Service Plan
The fourth Contract Amendment was approved by City Council of the City of Richmond or executed by the City Manager on for one or more of the following provisions (check those that apply):

Increased contract payment limit by $ ________________for a payment limit not to exceed $ _________________________.

Term Amendment (insert new termination date):________________________

Service Plan
The fifth Contract Amendment was approved by City Council of the City of Richmond or executed by the City Manager on for one or more of the
following provisions (check those that apply):

Increased contract payment limit by $ ________________for a payment limit not to exceed $ _________________________.

Term Amendment (insert new termination date):________________________

Service Plan
731
___ Exhibit F
___ Section 8
City of Richmond - Insurance Requirements – Type 1:

Consultants and Contractors
Type 1 – Page 1 of 4
Revised: September 2011
In all instances where a CONTRACTOR or its representatives will be conducting business and/or providing services, the City requires the following MINIMUM insurance requirements and limits.

CONTRACTOR shall procure and maintain for the duration of the contract, agreement, or other order for work, services or supplies, insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder and the results of that work by the CONTRACTOR, its agents, representatives, employees or subcontractors. Maintenance of proper insurance coverage is a material element of the contract. Failure to maintain or renew coverage or to provide evidence of renewal may be treated by the City as a material breach of contract.

CONTRACTOR agrees that in the event of loss due to any of the perils for which it has agreed to provide Commercial General Liability insurance, CONTRACTOR shall look solely to its insurance for recovery. CONTRACTOR hereby grants to CITY, on behalf of any insurer providing Commercial General Liability insurance to either CONTRACTOR or CITY with respect to the services of CONSULTANT herein, a waiver of any right to subrogation which any such insurer of said CONTRACTOR may acquire against the CITY by virtue of the payment of any loss under such insurance.

Original, signed certificates and original, separate policy endorsements, naming the City as an additional insured for general liability, as well as a waiver of subrogation for Workers’ Compensation insurance, shall be received and approved by the City before any work may begin. However, failure to do so shall not operate as a waiver of these insurance requirements.

City reserves the right to modify or require additional coverages for specific risk exposures depending on scope of CONTRACTORS work.

Minimum coverage is detailed below. The policy limits of coverage shall be made available to the full limits of the policy.

The minimum limits stated herein shall not serve to reduce the policy limits of coverage of CONTRACTOR.

Minimum Scope of Insurance – the following forms shall be provided and coverage shall be at least as broad as the following:

1. Insurance Services Office Commercial General Liability coverage (ISO Occurrence Form CG 0001) including coverage for bodily and personal injury, property damage, and products and completed operations.

2. Insurance Services Office Automobile Liability coverage (ISO Form CA 0001, Code 1, Any Auto)

3. Original and Separate Additional Insured Endorsements for General Liability (ISO Form CG 20 10 11/85 or its equivalent) with primary and non-contributory language.

4. Workers’ Compensation Insurance as required by the State of California including Employer’s Liability coverage.

5. Original and Separate Waiver of Subrogation for Workers’ Compensation and Builder’s Risk/ Course of Construction Insurance.

6. Builder’s Risk/Course of Construction insurance covering all risks of loss less policy exclusions when the City of Richmond has a financial interest in the property. – (Only required for Construction Contracts involving property)

7. Contractor’s Pollution Liability (if applicable for Construction Contractors) Required Coverage Minimum Limits
Workers’ Compensation and
Employers’ Liability
Statutory limits as required by the State of California including $1 million Employers’ Liability per accident, per employee for bodily injury or disease.

If CONTRACTOR is self-insured, provide a certificate of Permission to SelfInsure, signed by the California Department of Industrial Relations and SelfInsurance. If contractor is a sole proprietor (has no employees) than contractor must sign “Contractor Release of Liability” found at:
http://www.ci.richmond.ca.us/index.aspx?nid=61.
732
___ Exhibit F
___ Section 8
City of Richmond - Insurance Requirements – Type 1:

Consultants and Contractors
Type 1 – Page 2 of 4
Revised: September 2011

PROJECT COST REQUIRED LIMIT
$0 - $5 million $2 million p/o
$5 million - $10 million $5 million p/o
Over $10 million $10 million p/o
Fireworks $5 million p/o
General Liability
(primary and excess limits
combined)

Includes coverage for bodily injury, personal injury, property damage and products and completed operations. The policy shall not exclude coverage for XCU perils (explosion, collapse, or damage to underground property).

If the policy includes a general aggregate, either the general aggregate shall apply separately to this project, service or location or the minimum required aggregate limit shall be twice the per occurrence limit ($4 million aggregate limit).

Policy shall be endorsed to name the City of Richmond as an additional insured per the conditions detailed below.

Automobile Liability $1,000,000 per occurrence for bodily injury and property damage.

Builders’ Risk/Course of
Construction – Covers property
under construction, repair or
renovation as well as equipment
and materials to be installed.
(Only required for Construction
Projects involving property and
equipment installation.)
Coverage shall include all risks of direct physical loss, excluding earthquake, for an amount equal to the full completed value of the covered structure or replacement value of alterations or additions, including soft costs and business interruption.

If the project does not involve new or major reconstruction, an Installation Floater may be acceptable. For such projects, a property installation floater shall be obtained that provides for the improvement, remodel, modification, alteration, conversion or adjustment to existing buildings, structures, processes, machinery and equipment. The Property Installation Floater shall provide property damage coverage for any building, structure, machinery or equipment damaged, impaired, broken or destroyed during the performance of the Work, including during transit, installation and testing at the City of Richmond’s site.

The City of Richmond shall be named as loss payee as its interest may appear. The insurer shall waive all rights of subrogation against City.

Contractor’s Pollution Liability (if
applicable)
Protects against:
unexpected/unintended release of
pollution resulting from contractors
covered operations such as:

HVAC, paving, carpentry, pipeline
& tank installation, drillers,
remediation contractors,
maintenance, mechanical,
demolition, excavation, grading,
street/road construction,
residential & commercial builders.

Same limits as General Liability.

Required Policy Conditions
A. M. Best Rating A:VII or Better. If the A.M. Best Rating falls below the required rating, CONTRACTOR must replace coverage immediately and provide notice to City.

Additional Insured Endorsement Applicable to General Liability Coverage.

The City of Richmond, its officers, officials, employees, agents and volunteers are to be named as additional insureds for all liability arising out of the operations by or on behalf of the named insured, including but not limited to bodily injury, deaths and property damage or destruction arising in any respect directly or indirectly in the performance of this contract.

ISO form CG 20 10 (11/85) or its equivalent is required. The endorsement must not exclude products and completed operations coverage. If it does, then CG 20 37 (10/01) is also required. 733
___ Exhibit F
___ Section 8
City of Richmond - Insurance Requirements – Type 1:

Consultants and Contractors
Type 1 – Page 3 of 4
Revised: September 2011
Additional Insured Endorsement
(continued)
SAMPLE Endorsements can be found at
http://www.ci.richmond.ca.us/index.aspx?nid=61
Primary and Noncontributory The contractor’s insurance coverage must be primary coverage as it pertains to the City, its officers, officials, employees, agents and volunteers. Any insurance or self insurance maintained by the City is wholly separate from the insurance of the contractor and in no way relieves the contractor from its responsibility to provide insurance.

Waiver of Subrogation
Endorsement Form
Contractor’s insurer will provide a Waiver of Subrogation in favor of the City for Workers Compensation and Builder’s Risk/ Course of Construction coverage during the life of this contract.

SAMPLE Endorsements can be found at
http://www.ci.richmond.ca.us/index.aspx?nid=61
Deductibles and Self-Insured
Retentions
Any deductible or self-insured retention must be declared to and approved by the City. At the option of the City either the insurer shall reduce or eliminate such deductibles or self-insured retention as respects the City or the CONTRACTOR shall procure a financial guarantee in an amount equal to the deductible or self-insured retention guaranteeing payment of losses and related investigations, claims administration and defense expenses.

Contractor is responsible for satisfaction of the deductible and/or self-insured retention for each loss.

Loss Payable Endorsement (only
required when Builder’s Risk
and/or Course of Construction
Insurance is required.)
Applicable to Builder’s Risk/Course of Construction naming the City of Richmond as Loss Payee.

SURETY BONDS
(If a Public Works/Engineering
Project)
The Contractor shall provide:

1. A Bid bond

2. A Performance Bond

3. A Payment Bond
Umbrella/Excess Liability Policies
If an Umbrella or Excess Liability Policy is used to meet the liability limits, coverage shall be as broad as specified for underlying coverages and cover those insured in the underlying policies.

Claims-Made Policies
If any insurance policy is written on a claims-made form: 1) the retroactive date must be shown, and must be before the date of the contract or the beginning of contract work. 2) Insurance must be maintained and evidence of insurance must be provided for at least five (5) years after completion of the contract of work. 3) If coverage is canceled or nonrenewed, and not replaced with another claims-made policy form with a retroactive date prior to the contract effective date, the Contractor must purchase an extended period coverage for a minimum of five (5) years after completion of contract work.

Subcontractors
CONTRACTOR shall include all subcontractors as insured under its policies or shall furnish to the City for review and approval, separate certificates and endorsements for each subcontractor. All coverage for subcontractors shall be subject to all of the requirements stated herein.

CONTRACTOR agrees to defend and indemnify the City of Richmond for any damage resulting to it from failure of either CONTRACTOR or any subcontractor to take out or maintain the required insurance policies. The fact that insurance is obtained by CONTRACTOR, and/or CONTRACTOR’s subcontractors, will not be deemed to release or diminish the liability of CONTRACTOR, including, without limitation, liability under the indemnity provisions of this contract. Damages recoverable by CITY from CONTRACTOR or any third party will not be limited by the amount of the required insurance coverage.
734
___ Exhibit F
___ Section 8
City of Richmond - Insurance Requirements – Type 1:

Consultants and Contractors
Type 1 – Page 4 of 4
Revised: September 2011
Verification of Coverage
All original certificates and endorsements shall be received and approved by the City before work may begin. The City of Richmond reserves the right to require complete, certified copies of all required insurance policies including endorsements affecting the coverage at any time.

Original insurance certificates and required policy endorsements shall be mailed, or delivered to the Designated Project Manager for the City of Richmond.

Insurance certificates and endorsements may be faxed to the Designated Project Manager. However, Contractor must mail the original certificates and endorsements to Designated Project Manager once faxed.

Continuous Coverage
CONTRACTOR shall maintain the required insurance for the life of the contract. Should the CONTRACTOR cease to have insurance as required during this time, all work by the CONTRACTOR pursuant to this agreement shall cease until insurance acceptable to the City is provided. In the event that CONTRACTOR fails to comply with the City’s insurance requirements, the City may take such action as it deems necessary to protect the City’s interests. Such action may include but is not limited to termination of the contract, withholding of payments, or other actions as the City deems appropriate.

If services or the scope of work extend beyond the expiration dates of the required insurance policies initially approved by the City, CONTRACTOR must provide updated certificates and endorsements indicating that the required coverage, terms and conditions are still in place. Renewal certificates and updated endorsements shall be mailed to the Designated Project Manager.

Cancellation
CONTRACTOR shall ensure that coverage shall not be cancelled, reduced or otherwise materially changed except after thirty (30) days’ prior written notice has been given to the City.

Reporting Requirements
Any failure to comply with reporting or other provisions of the policies including breaches of warranties shall not affect coverage provided to the City, its officers, officials, employees or volunteers.

Consistent with Public Policy
The insuring provisions, insofar as they may be judged to be against public policy shall be void and unenforceable only to the minimum extent necessary so that the remaining terms and provisions herein may be consistent with public policy and thus enforceable.
735
EXHIBIT A – SERVICE PLAN

REVISED SCOPE OF SERVICES AND COMPENSATION SCHEDULE
American Rivers will continue to support the City of Richmond in implementing the tasks and deliverables in the California Natural Resources Agency’s (CNRA) Urban Flood Protection grant for the Flood Risk Reduction in the Rheem Creek Watershed project to restore Rheem Creek to address creek overflows and flooding in the Rollingwood community through the end of the revised term of the CNRA grant, which has been extended from March 1, 2024 to November 15, 2026.

Term of Services: July 1, 2022 to November 15, 2026
Total Amount: $300,500 (original contract) plus additional amount of $148,200 for a total of $448,700.

Task 1. DIRECT PROJECT MANAGEMENT & ADMINISTRATION
American Rivers (AR) will continue to help the City of Richmond manage the California Natural Resources Agency (CNRA) Flood Risk Reduction in the Rheem Creek Watershed grant, including subcontracting with Restoration Design Group (RDG) and The Watershed Project (TWP).

AR Deliverables:
 Prepare and submit signed subcontracts to the City of Richmond  Prepare and submit invoices to the City of Richmond
 Organize monthly check-in calls with project partners  Finalize Operation, Maintenance, Monitoring and Funding Plan  Work with the City to provide project reports and/or photographs upon request by the State  Prepare and submit Payment Request Form (including proof of payment) to CNRA on behalf of the City
 Provide project reports and/or photographs upon request by the State on behalf of the City Justification for Increase Budget for AR for Task 1:
$55,000 will provide American Rivers funding to provide 33 more months of project management between March 1, 2024 and Nov 15, 2026. This includes monthly meetings March-April and Nov-Dec 2024, bimonthly meetings druing construciton between May 1 and October 2024, and quarterly meetings between Jan 2025 and Nov 2026. AR will also help the City prepare and submit Payment Request Forms to CNRA on behalf of the City, a service not previously provided by AR.

City Responsibilities:
 Provide AR documentation needed to prepare and submit Payment Request Form (including proof of payment) to CNRA
 Review project reports prepared by AR and/or photographs upon request by the State  Submit CEQA documents to State
 Provide evidence of adequate Land Tenure/Site Control to State  Submit final site design/plans/specifications (including plant palette) to State  Submit evidence of interpretive signage to State
736
 Record deed restriction and submit project closeout package with final payment request to State  Submit all documentation for Project completion within 90 days of Project completion, but no later than November 15, 2026
The Watershed Project Responsibilities:
 Sign contract between TWP and AR
 Prepare and submit invoices to AR
 Sign subcontract amendment with Urban Tilth for additional $6,200 to store and re-grow plants  Post project construction monitoring of creek water quality, sediment flow, and plant survival and establishment
 Lead community outreach and engagement and work with community partners to keep residents informed about the final design and planned construction activities Justification for Increase Budget for TWP for Task 1:

TWP will amend subcontract with Urban Tilth for $6,200 to store and re-grow plants due to the delay in construction. TWP will conduct monitoring of water quality, sediment flow, and plant survival and establishment for $13,000 to ensure post construction monitoring can continue after phase 2 construction is complete until the end of the contract on Nov 15, 2026. $50,000 will provide TWP funding for continued community outreach and engagement, which includes $25,000 for facilitating community engagement events through the end of 2024 and $12,500 per year for the next two years of ongoing work with the community.

Task 2. CONSTRUCTION
The City will manage the construction of this Capital Improvements Project with support from RDG, who will help provide construction oversight and management to the City.

City Responsibilities:
 Oversee construction and landscape contract
 Manage contingency
RDG Responsibilities:
 Sign contract between RDG and AR
 Prepare and submit invoices to AR
 Provide construction contract administration to support the City of Richmond Justification for Increase Budget for RDG for Task 2:
$24K will provide RDG funding for 16 more weeks of construction contract administration to continue to provide construction phase services between May and October 2024. RDG's original scope covers 12 weeks of construction which they exceeded in December 2023. 737
Budget*
Task Original
Budget Amendment REVISED Budget
Task 1: Non-Construction Costs - Direct Project
Management & Administration

1.01 AR Personnel $50,000.00 $55,000.00 $105,000.00

1.02 Technical Consultants - TBD $5,000.00 $5,000.00

1.02 Technical Consultants - TWP to Urban Tilth $6,200.00 $6,200.00

1.03 Design and Engineering - RDG $77,500.00 $77,500.00

1.04 Interpretive Sign Design - TWP $3,000.00 $3,000.00

1.05 Environmental Documents (CEQA) - RDG $18,000.00 $18,000.00

1.08 OM&M Funding Plan - AR $10,000.00 $10,000.00

1.09 Monitoring of water quality & sediment flow (pre & post) - TWP $27,000.00 $13,000.00 $40,000.00

1.10 Community Outreach and Engagement - TWP $ 50,000.00 $50,000.00 $100,000.00 Task 1 Subtotal $240,500.00 $124,200.00 $364,700.00
Task 2: Construction

2.12 Construction Oversight and Management - RDG $30,000.00 $24,000.00 $54,000.00 Task 2 Subtotal $30,000.00 $24,000.00 $54,000.00
Task 3: Greening / Revegetation

3.02 Plants to be installed by volunteers - TWP $5,000.00 $5,000.00

3.05 Planting Oversight - TWP $25,000.00 $25,000.00
Task 3 Subtotal $30,000.00 $30,000.00
TOTAL $300,500.00 $148,200.00 $448,700.00
This is an estimate of how funding will be allocated by task. American Rivers will not exceed the total contract amount, but funding allocated within each task may change. Any changes may require an informal or formal amendment from CNRA.

Mileage will be reimbursed at the IRS Standard Mileage Rates. Beginning January 1, 2024, the rate is $0.67/mile. All mileage and other expenses will be included in the total contracted amount. 738

Page 1 of 2 ends

June 25, 2024
Department
DATE: June 25, 2024
TO: Mayor Martinez and Members of the City Council
FROM: Daniel Chavarria, PE, Director of Public Works
Tawfic Halaby, PE, Deputy Director of Public Works
Greg Hardesty, Parks & Landscaping Superintendent
Subject: Hilltop Landscape District Office Trailer and Yard Lease FINANCIAL IMPACT: The proposed expenditure of $33,726.48 will be funded from the proposed fiscal year 2024-2025 Hilltop
Landscape Maintenance District Operational Budget
(11233731-400536). There is no impact to the General
Fund.

PREVIOUS COUNCIL
ACTION:

None

STATEMENT OF THE
ISSUE:

Public Works staff is requesting authorization to continue the month-to-month lease with North Richmond
Properties, Inc. for office trailers and yard space to store containers and landscaping equipment.

RECOMMENDED ACTION: APPROVE a seventh lease amendment with North Richmond Properties, Inc., in an amount not to exceed
$33,726.48, for a month-to-month for a one-year term,
for the rental of two office trailers and space to store containers and landscaping equipment – Public Works
Department (Daniel Chavarria 510-620-5478/Greg
Hardesty 510-620-6920).

AGENDA
REPORT
739

Page 2 of 2 ends

June 25, 2024
DISCUSSION:

In 2015, the Public Works Department leased storage space for equipment at 2801 Giant Road. The proximity to the Hilltop District, greatly improved the efficiency of the Parks & Landscaping Division reducing the travel time associated with transporting equipment from the Parks Yard on Leona Avenue to the Hilltop area, enabling City staff to spend more time in the field.

In April 2019, Parks Operations had to vacate the office trailer in the parking lot at Hilltop Mall. Parks Operations sought additional space and now occupy two office trailers at the storage yard at 2801 Giant Road. City staff is seeking approval to continue with the month-to-month lease agreement. The new monthly payment for this lease will be $2,810.54 per month, for the next fiscal year, which includes equipment storage space and two office trailers. This represents a 4 percent increase compared to the previous year. The expense will be paid from Fiscal Year 2024-2025 Hilltop Maintenance District Operational Fund.

City staff recommends approval of seventh amendment lease agreement.

DOCUMENTS ATTACHED:

Attachment 1 – Original Lease
Attachment 2 – Lease Agreement Amendment #1
Attachment 3 – Lease Agreement Amendment #2
Attachment 4 – Lease Agreement Amendment #3
Attachment 5 – Lease Agreement Amendment #4
Attachment 6 – Lease Agreement Amendment #5
Attachment 7 – Lease Agreement Amendment #6
Attachment 8 – Lease Agreement Amendment #7
740
741
742
743
744
745
746
747
748
749
750
751
752
753
754
755
756
757
758
DocuSign Envelope ID: 9940223F-510C-4609-8F51-D00C84B10D7E 7/30/2021
759
760
761
762

Page 1 of 4 ends

June 25, 2024
Public Works
DATE: June 25, 2024
TO: Mayor Martinez and Members of the City Council
FROM: Daniel Chavarria, PE, Director of Public Works
Robert Armijo, PE, Deputy Director of Public Works
Josef Munoz, Capital Improvement Manager
Jene Levine-Snipes, Development Project Manager
Subject: Approval to Accept and Award Boorman Park Project Bids and Authorize Change Orders Due to Project Grant
Deadlines and Council Recess
FINANCIAL IMPACT: The Boorman Park Remediation and Revitalization Projects are funded by the General Capital Fund,
Engineering Grant Fund, and Outside Grant Fund for FY
2024-2025.

Account Strings:

Remediation
10633031-400708-23030 & 20136031-400708-23030
Revitalization
15436431-400708-23006 & 20136031-400708-23006

PREVIOUS COUNCIL
ACTION:

STATEMENT OF THE
ISSUE:

The City Council's recess from July 3, 2024, to
September 2, 2024, and the grants project completion
deadline, necessitates authorizing the City Manager to
accept and award bids, and the Director of Public Works to approve change orders for the Boorman Park
Remediation and Revitalization Projects to avoid
potential funding losses.

AGENDA
REPORT
763

Page 2 of 4 ends

June 25, 2024
RECOMMENDED ACTION: ADOPT a resolution granting the city manager the authority to accept bids and award contracts for the
Boorman Park Remediation and Revitalization Projects;
and AUTHORIZE the Director of Public Works to approve
change orders up to 10 percent of the construction costs, provided the award and change orders remain within the
Council-approved budget for Fiscal Year 2024-2025 –
Public Works Department (Daniel Chavarria/Robert
Armijo/Josef Munoz 510-620-5478).

DISCUSSION:

Boorman Park is a 3.3-acre park in the Coronado Neighborhood at 2799 Maine Avenue.

The park has fallen into disrepair and needs rehabilitation. Revitalizing the community park will provide numerous benefits, including improved quality of life, increased property values, community pride, and economic development. In 2019, City staff worked to identify and apply for grant opportunities to aid in the redevelopment effort. 764

Page 3 of 4 ends

June 25, 2024
Projects
Boorman Park Remediation Project
The Boorman Park Remediation Project aims to address soil contamination within the park. The project involves a comprehensive approach that includes investigation and assessment of the contamination, development of a tailored remediation strategy, implementation of remediation methods, validation and monitoring of results, and restoration of the site for safe reuse. This project is expected to remove or reduce soil contaminants to safe levels successfully, comply with regulatory requirements, protect human health and the environment, and restore the site to a usable condition. The remediation project is funded by General Capital Funds and the California Department of Transportation Clean California Local (Clean CA) Grant (See Attachment 3).

Boorman Park Revitalization Project
The Boorman Park Revitalization Project includes various improvements such as parking, tree planting, a basketball court, skate park elements, seating areas, multiple play areas, fitness equipment, picnic tables, a restroom, and a grass field.

The renovations are funded by General Capital Funds and the State of California Department of Parks and Recreation Statewide Park Development and Community Revitalization Program Prop 68 (Prop 68) Grant (See Attachment 2).

Project Funding Table
Project Uses Funding Sources Amount
(Rounded)
Remediation Design and Construction Clean CA $4.01M
Design and Construction General Capital $3.00M
Revitalization Design and Construction Prop 68 $4.17M
Design and Construction General Capital $1.50M
Total $12.68M
Schedule
The Remediation Project must be completed before the Revitalization Project. Ninyo and Moore Geotechnical and Environmental Sciences Consultants have served as designers for the Remediation Project, while CSW-Stuber-Stroeh Engineering Group has served as designers for the Revitalization Project. Mack5 Consultants has served as project manager and construction manager for both projects. Currently, both projects are in the design phase, with a projected completion of July 2024. After the design phase, the project will move into the bid and award phase between August 2024 to September 2024. Construction will begin in October 2024, with an anticipated completion date of June 2025.
765

Page 4 of 4 ends

June 25, 2024
The Clean CA grant requires that the park be fully constructed by June 2025. The two projects may be bid out together or separately; however, in consultation with staff, the City Manager will determine the most efficient approach.

Project Schedule Table
Project Phase Schedule
Design Complete July 2024
Bid August 2024
Award September 2024
Construction – Remediation October 2024 - December 2024 Construction – Revitalizaton January 2025 – June 2025
Close-Out July 2025 – December 2025
With the grant project deadline 12 months away and City Council set to recess, moving forward with the contracting process this summer is essential. Delaying the contracting process for the Boorman Park projects could result in missed grant deadlines, scheduling disruptions, and potential loss of funding.

Recommended Action
Staff requests City Council approval to authorize the City Manager to accept and award the construction bid(s) to the lowest responsive and responsible bidder(s) for the Boorman Park Site Remediation and Revitalization Projects and authorizing the Director of Public Works to approve change orders up to 10 percent of the construction costs, provided the award and change orders remain within the Council-approved FY 2024- 2025 budget (See Attachment 1). This authorization will ensure that the projects progress as scheduled and meet all necessary deadlines, maintaining the project's funding and delivery schedule.

DOCUMENTS ATTACHED:

Attachment 1 – Resolution
Attachment 2 – Agenda Report 06022020 Prop 68
Attachment 3 – Agenda Report 11182022 Clean CA
766
Reso. No. XX-24

Page 1 of 2 ends

RESOLUTION NO. XX-24

A RESOLUTION OF THE COUNCIL OF THE CITY OF RICHMOND, CALIFORNIA,

AUTHORIZING THE CITY MANAGER TO AWARD BIDS AND EXECUTE

CONTRACTS, AND THE DIRECTOR OF PUBLIC WORKS TO APPROVE CHANGE

ORDERS FOR THE BOORMAN PARK SITE REMEDIATION AND

REVITALIZATION PROJECTS
WHEREAS, Boorman Park is a 3.3-acre park in the Coronado Neighborhood located at 2799 Maine Ave, Richmond CA 94804 is in need of site remediation and renovation; and WHEREAS, In 2020 a capital improvement project to revitalize the park was funded.

The project includes parking, tree planting, a basketball court, skate park elements, seating areas, multiple play areas, fitness equipment, picnic tables, a restroom, and a grass field; and WHEREAS, in the design phase soil testing revealed extensive soil remediation was needed in order to proceed with the park improvements; and WHEREAS, the City of Richmond has received a $4,165,000 State of California Department of Parks and Recreation Statewide Park Development and Community Revitalization Program Prop 68 Grant for the Boorman Park Revitalization Project; and WHEREAS, the City of Richmond has received a $4,000,000 for Boorman Park Site Remediation Project under the California Department of Transportation Clean California Local Grant Program; and
WHEREAS, all CIP projects must comply with the requirements set for by the California Environmental Quality Act (CEQA) or the National Environment Policy Act (NEPA); and
WHEREAS, the City Manager, in consultation with staff, will determine whether to bid the projects together or separately, considering the most efficient approach; and WHEREAS, the Department of Public Works has identified the Boorman Park Site Remediation and Revitalization Projects as critical projects that need to proceed with the contracting process during the recess to meet grant funding deadlines and project delivery schedules; and
WHEREAS, delaying the bid and award process for these projects could result in missed deadlines, schedule disruptions, and potential loss of grant funding; and WHEREAS, it is necessary to authorize the City Manager to award bids and execute contracts for these two projects to ensure timely progression and adherence to the approved budget and schedules; and
WHEREAS, it is also necessary to authorize the Director of Public Works to approve change orders up to 10% of the construction costs, provided these change orders remain within the overall project budget; and
WHEREAS, the projects are funded by various sources including the General Capital Fund, Engineering Grant Fund, and Outside Grant Fund; and WHEREAS, the account strings for these projects have been identified and allocated in the Fiscal Year 2024-2025 approved budget.

NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Richmond hereby authorizes the City Manager to award bids and execute contracts with the lowest responsive and responsible bidders for the Boorman Park Site Remediation and Revitalization Projects, up to the Council-approved budget for the projects for Fiscal Year 2024- 2025.
767
Reso. No. XX-24

Page 2 of 2 ends

BE IT FURTHER RESOLVED that the Director of Public Works is authorized to approve change orders up to 10% of the construction costs, provided that such change orders fit within the projects’ budget.

BE IT FURTHER RESOLVED that staff shall ensure that the awarded bids are within the Council-approved budget for Fiscal Year 2024-2025.
**********************
I certify that the foregoing resolution was passed and adopted by the Council of the City of Richmond at a regular meeting thereof held June 25, 2024, by the following vote:

AYES:

NOES:

ABSTENTIONS:

ABSENT:

CLERK OF THE CITY OF RICHMOND
(SEAL)
Approved:

Mayor
Approved as to form:

City Attorney
768

June 2, 2020 Page 1 of 2 C:\PROGRAM FILES (X86)\NEEVIA.COM\DOCCONVERTERPRO\TEMP\NVDC\80B58DCA9AC1-4927-B097-B60AB3A0B308\91192.DOCX

COMMUNITY SERVICES

DEPARTMENT
DATE: June 2, 2020
TO: Mayor Butt and Members of the City Council
FROM: Sal Vaca, Community Services Director
Ranjana Maharaj, Community Services Administrative Manager Jene Levine-Snipes, Development Project Manager
SUBJECT: RESOLUTION TO ACCEPT AND APPROPRIATE STATE OF CALIFORNIA PARK

DEVELOPMENT PROGRAM FUNDS FOR THE BOORMAN PARK

REVITALIZATION PROJECT
STATEMENT OF THE ISSUE:

Staff is requesting City Council to approve a resolution to ACCEPT and APPROPRIATE grant funds in the amount of $4,165,000 from the State of California Department of Parks and Recreation Prop 68 funds to revitalize Boorman Park.

RECOMMENDED ACTION:

Approve a resolution to ACCEPT and APPROPRIATE grant funds in the amount of $4,165,000 from the State of California Department of Parks and Recreation Prop 68 funds to revitalize Boorman Park.

FINANCIAL IMPACT OF RECOMMENDATION:

These actions do not create any direct cost or liability to the City’s General Fund. The actions contemplated here would generate a one-time grant that does not have to be repaid. These funds would be administered by the Community Services Department in accordance with SPP rules and regulations. The Community Services Department will adjust its budget accordingly and set up a fund for this program.

DISCUSSION:

The State of California Department of Parks and Recreation is providing the City of Richmond Community Services Department funds to revitalize Boorman Park, a 3.3-acre park in AGENDA
REPORT
769

June 2, 2020 Page 2 of 2 C:\PROGRAM FILES (X86)\NEEVIA.COM\DOCCONVERTERPRO\TEMP\NVDC\80B58DCA9AC1-4927-B097-B60AB3A0B308\91192.DOCX the Coronado Neighborhood. This public park project aims to improve health and wellness, safety, beauty, access to outdoor recreation, and to help catalyze community revitalization for a diversity of ages and abilities. The project includes final design, engineering, and construction of park improvements including: a soccer field, basketball court, children’s play areas with integrated artwork, a fitness zone, community gathering areas including a shade pavilion and outdoor classroom, a multi-use trail with fitness stations, skate features, a public restroom with amenities, two parking lots, and perimeter fencing. Sustainable design features include green infrastructure for stormwater management, energy efficient lighting, Bay-Friendly landscaping, permeable paving, and the use of site furnishings and equipment that utilize recycled content.

The synthetic turf soccer field serves as a bioretention area. The park design features include high quality materials and equipment for longevity/durability and low maintenance.

On June 18, 2019, Council authorized the application and authority to submit all documents including applications, agreements and payment requests necessary for the completion of the Grant Scope. February 20, 2020 the City was notified of the grant award and signed the Grant Agreement on April 6, 2020.

Staff is requesting City Council to approve the resolution to accept and appropriate the grant funds and adjust the FY2020-2021 revenues and expenditures by $4,165,000.

DOCUMENTS ATTACHED:

Resolution
Boorman Park Award letter
770

Page 1 of 3 ends

October 18, 2022
Public Works
DATE: October 18, 2022
TO: Mayor Butt and Members of the City Council
FROM: Nickie Mastay, Deputy City Manager
LaShonda White, Interim Director Community Services
Ranjana Maharaj, Deputy Director of Community Services, Recreation Division
Jene Levine-Snipes, Development Project Manager
Subject: Resolution to Accept and Appropriate State of California Department of Transportation Clean California Grant
Program Funds for the Richmond Communities Clean
Collaborative Project and Approve Sole Source Contracts for Richmond Main Street Initiative, Rebu
FINANCIAL IMPACT: These actions do not create any direct cost or liability to the City’s General Fund. The actions contemplated here would generate a one-time grant that does not have to be repaid.

These funds would be administered by the Public Works
Department in accordance with SPP rules and regulations.

The Public Works Department, Parks Division will adjust its budget accordingly and set up a fund for this program.

PREVIOUS COUNCIL
ACTION:

None

STATEMENT OF THE
ISSUE:

City staff is requesting City Council to approve a resolution to accept and appropriate grant funds in the amount of
$5,000,000 from the State of California Department of
Transportation (CalTrans) Clean California Grant Program for Richmond Communities Clean Collaborative Project and approve Sole Source contracts for Richmond Main Street
Initiative, Rebuilding Together East Bay-North, and Earth Island Institute (KIDS for the BAY Project).

AGENDA
REPORT
771

Page 2 of 3 ends

October 18, 2022

RECOMMENDED
ACTION:

ADOPT a resolution to ACCEPT and APPROPRIATE grant
funds in the amount of $5,000,000 from the State of
California Department of Transportation (CalTrans) Clean California Grant Fund; and AUTHORIZE the City Manager
or their designee to execute the agreement – Public Works (Nickie Mastay/Jene Levine- Snipes 510-307-8132).

DISCUSSION:

Richmond Communities Clean Collaborative consists of two (2) Infrastructure projects, The Boorman Park Revitalization Project and the 7th Street Connection Project.

Boorman Park was redesigned by the community and will reconstruct an existing park and change the site layout for safety and ease of maintenance. The 7th Street project consists of a sidewalk and bicycle facility gap closure and the transformation of an unpaved alley. The remaining of the Clean Collaboratives include multiple projects concentrated in a cluster of underserved neighborhoods in the heart of the City of Richmond: Iron Triangle, Atchison Village, Richmore Village/Metro Square, Belding Woods, Cortez/Stege, Coronado, and Santa Fe. The programs will engage and uplift youth, individuals impacted by the social justice system, unhoused neighbors, and other residents through employment and volunteer service, dumpster days, clean-up and enhancement activities, outreach, and waste reduction education.

On January 31, 2022, City of Richmond staff submitted the application for the Richmond Communities Clean Collaborative. On May 17, 2022, the City was notified of the grant award. The project must be completed by June 30, 2024.

City staff is requesting City Council to approve the resolution to accept and appropriate the grant funds and adjust the FY2022-2023 revenues and expenditures by $5,000,000.

The project is a result of a collaboration in the grant application submittal with the City of Richmond and Richmond Main Street Initiative, Rebuilding Together East Bay-North, and Earth Island Institute (KIDS for the BAY Project). All consultants collaborated with the City and community to create the program, budget and timeline for the State awarded concept design of the Richmond Communities Clean Collaborative project. The table below represents the partner collaboration and budget listed in the approved application. 772

Page 3 of 3 ends

October 18, 2022
Contractor Program/Project Amount
Richmond Main Street Initiative Richmond Community
Greenspace Enhancement
project
Downtown Richmond
Neighborhood Ambassadors
Program
$ 44,994
Rebuilding Together East Bay-North Illegal Dumping Programming $ 135,082 Earth Island Institute (KIDS for the
BAY Project)
Richmond Park and Watershed
Rangers
$ 85,902
I Heart Richmond Campaign (City of
Richmond)
Dumpster Day, Clean Up
Events, Illegal Dumping
Deterrents
$ 106,003
TBD Boorman Park Revitalization $4,014,266
TBD 7
th Street Bike Path $ 613,753
Total $5,000,000
DOCUMENTS ATTACHED:

Attachment 1 – Resolution
Attachment 2 – Grant Award Letter
Attachment 3 – Approved Sole Source Richmond Main Street Sole Source Attachment 4 – Contract Richmond Main Street
Attachment 5 – Approved Sole Source Rebuilding Together East Bay-North Attachment 6 – Contract Rebuilding Together East Bay-North Attachment 7 – Approved Sole Source KIDS for the BAY Project Sole Source Attachment 8 – Contract KIDS for the BAY Project
773

Page 1 of 2 ends

June 25, 2024
Public Works
DATE: June 25, 2024
TO: Mayor Martinez and Members of the City Council
FROM: Daniel Chavarria, Director of Public Works
Carl Capistrano, Facilities Maintenance Superintendent
Subject: Contract with Security Signal Devices Inc. for Intrusion and Fire Alarm System Monitoring
FINANCIAL IMPACT: The funds expended for this contract will from budgeted fiscal year 2023-2024 professional services (01232531-
400218) in the amount of $6,314.70.

PREVIOUS COUNCIL
ACTION:

N/A

STATEMENT OF THE
ISSUE:

City staff members are requesting approval of an afterthe-fact contract with Security Signal Devices, Inc. for intrusion and fire alarm system monitoring services for City buildings.

RECOMMENDED ACTION: APPROVE an after-the-fact contract with Security Signal Devices Inc. to pay for services provided for intrusion and fire alarm system monitoring for City buildings in amount not-to-exceed $16,314.70, for the term November 16,
2022, through October 1, 2023, funded by budgeted
Fiscal Year 2023-2024 professional services - Public
Works Department (Daniel Chavarria 510-620-5478/Carl
Capistrano 510-620-6896).

AGENDA
REPORT
774

Page 2 of 2 ends

June 25, 2024
DISCUSSION:

The Department of Public Works contract with Security Signal Devices, Inc. for intrusion and fire alarm maintenance and monitoring services expired November 15, 2022 (See Attachment 2). The City contracts for intrusion and fire alarm maintenance and monitoring services at all City buildings. On October 6, 2022, a Request for Proposal (RFP) for these services was solicited via Bids Online (See Attachment 4). Fivehundred fifty (550) vendors were notified of this posting (See Attachment 5). On November 8, 2022, three proposals were received and evaluated.

On March 21, 2023, Richmond City Council approved a contract with Security Signal Devices, Inc. to provide intrusion and fire alarm maintenance and monitoring services at all City buildings. However, Security Signal Devices, Inc. declined to accept the City’s contract terms and conditions.

City staff recommended approval of a contract with First Alarm, Inc., the second highest rank. The contract was awarded by the City Council on June 20, 2023.

Security Signal Devices, Inc. continued to provide intrusion and fire alarm maintenance and monitoring services to the City through September 30, 2023, without a contract in place. The City satisfied a purchase order in the amount of $10,000 for services performed from November 16, 2022, through September 30, 2023, however the total cost of services performed exceeded that amount by $6,314.70, for a total amount of $16,314.70. City staff therefore needs City Council approval of a contract, subject to the attached after-the-fact form, with an amount not to exceed $16,314.70 to pay the outstanding invoices from Security Signal Devices, Inc. for intrusion and fire alarm maintenance and monitoring services rendered from November 16, 2022, through October 1, 2023 (See Attachment 3).

DOCUMENTS ATTACHED:

Attachment 1 – After the Fact Form
Attachment 2 – Contract #4010
Attachment 3 – Contract #4010 Amendment #1
Attachment 4 – Request for Proposal
Attachment 5 – Bids Online Project Report
Attachment 6 – Sole Source Justification
775
After-The-Fact Purchase Authorization Form (as of June 15, 2011) Please attach this form to the requisition
If you previously initiated a transaction that created an after-the-fact supplier invoice, it must be processed via the `After-the-Fact (ATF) Purchase Authorization' Form.

An After-The-Fact purchase occurs when a department makes a purchase before a purchase order number is issued. For example, authorizing a vendor to begin work before the Purchasing Division issues a purchase order.

Similarly, obtaining goods or services on credit and subsequently submitting the invoice to accounts payable is an AFT. All ATFs, regardless of the dollar amount, present problems for the Purchasing Division, Accounts Payable, vendors, and end-users.

In many cases, these transactions:
* Place the City at financial and credit risk and result in higher than necessary cost paid for products and services. * Create unnecessary administrative efforts
* Bypass City encumbrance requirements
* Violate procurement polices and procedures
When an ATF purchase has been identified, the managing supervisor that made the unauthorized purchase shall complete this form.

Please provide detailed statement explaining the circumstances surrounding this ATF purchase.

What corrective steps have taken to avoid repetition of future ATF's? Any corrective action with the responsible managing supervisor?

Vendor Name:

Amount of Purchase: $

Purchase Date:

I understand that all City purchases require pre-approval and need to be purchased utilizing City policies and procedures.

Supervisor Name Signature Title
Department Director authorizing After-The-Fact Purchase

Name Signature Date
SSD Alarm Contract #4010 expired 11/15/22 they continued to provide services for intrusion & fire alarm system monitoring for City buildings there are 33 invoices for a total amount of $6,314.70 billed between 7/1/23-9/30/23.

PW management going to implement a centralized payment system for admin staff to check payments are processed by Finance.

Management will ensure admin staff complete PO Receiving invoices on time.

SSD/Security Signal Devices, Inc.
6,314.70 7/1/2023-9/30/23
Tawfic Halaby Deputy Director - Operations & Main
Daniel Chavarria
05/24/2024
776
SSD Alarm
Aging Report
Acct# Invoice # Due Date Amount
357973 R-00467780 9/1/2023 2,679.06 $
R-00455718 7/1/2023 174.46 $
R-00466236 9/1/2023 174.46 $
S-01108677 8/23/2023 213.18 $
339960 R-00464171 9/1/2023 531.87 $
R-00456687 7/1/2023 218.18 $
R-00465054 9/1/2023 218.18 $
R-00458244 7/1/2023 175.04 $
R-00468026 9/1/2023 175.04 $
356113 R-00467492 9/1/2023 341.64 $
339954 R-00465666 9/1/2023 198.33 $
R-00455300 7/1/2023 98.66 $
R-00468136 9/1/2023 98.66 $
R-00457992 7/1/2023 82.32 $
R-00464209 9/1/2023 82.32 $
340065 R-00453977 7/1/2023 155.97 $
339938 R-00456660 7/1/2023 131.46 $
355549 R-00454648 7/1/2023 131.43 $
348354 R-00456700 7/1/2023 65.73 $
339008 R-00468442 9/1/2023 64.16 $
R-00454832 7/1/2023 21.91 $
R-00468404 9/1/2023 21.91 $
R-00457350 7/1/2023 21.91 $
R-00464449 9/1/2023 21.91 $
R-00453047 7/1/2023 21.91 $
R-00465504 9/1/2023 21.91 $
R-00450841 7/1/2023 21.91 $
R-00466413 9/1/2023 21.91 $
R-00457138 7/1/2023 21.91 $
R-00467861 9/1/2023 21.91 $
339809 R-00465262 9/1/2023 39.90 $
339940 R-00466156 9/1/2023 23.64 $
355548 R-00466638 9/1/2023 21.91 $
TOTAL $ 6,314.70
339931
339004
339816
349827
339806
339808
355552
339009
339007
339949
777
778
779
780
781
782
783
784
785
786
787
788
789
790
791
792
793
794
795
796
797
798
799
800
801
802
803
804
805
806
807
808
809
810
811
812
813
814
815
816
817
818
819
820
821
822
823
824
825
826
827
828
829
830
831
832
833
834
835
836
837
838
839
840
841
842
843
844
845
846
847
848
849
850
851
852
853
854
855
856
857
858
859
860
861
862
863
864
865
866
867
868
869
870
871
872
873
874
875
876
877
878
879
880
881
882
883
884
885
886
887
888
889
890
891
892
893
894
895
896
897
898
899
900
901
902
903
904
905
906
907
908
909
910

Page 1 of 3 ends

June 25, 2024
Public Works
DATE: June 25, 2024
TO: Mayor Martinez and Members of the City Council
FROM: Daniel Chavarria, PE, Director of Public Works
Robert Armijo, PE, Deputy Director of Public Works / City Engineer
Jeffrey Barich, PE, Senior Civil Engineer
Subject: Sodium Bisulfite Facility and Chlorine Building Upgrade Project Completion and Financial Close-Out
FINANCIAL IMPACT: The increase of the contract in the amount of $666,419 will be paid from the Wastewater Enterprise Fund
(40322931-400708-01N10).

PREVIOUS COUNCIL
ACTION:

July 27, 2021 - Resolution 97-21

STATEMENT OF THE
ISSUE:

The upgrade of the Sodium Bisulfite Facility and Chlorine Building is ready for close-out, having been beneficially occupied. Eight change orders increased costs by
$666,419 due to unforeseen conditions. City Council
approval is sought to accept the project as complete and to allocate additional 2019A Wastewater Bonds funds to
cover these expenses.

RECOMMENDED ACTION: ADOPT a resolution to increase the contract for the Sodium Bisulfite (SBS) Project in the amount of $666,419 for a total amount not to exceed $7,096,210; and
ACCEPT the Sodium Bisulfite (SBS) Facility and Chlorine Building upgrade project as complete – Public Works
Department (Daniel Chavarria 510-620-5478 / Robert
Armijo 510-620-5477).

AGENDA
REPORT
911

Page 2 of 3 ends

June 25, 2024
DISCUSSION:

The West County Agency (WCA) Sodium Bisulfite (SBS) Facilities Improvements project is a joint effort between the City of Richmond, WCW, Veolia Water and supported by various engineering design and construction consultants. The SBS Facilities remove chlorine from combined effluent discharged from both treatment plants prior to final discharge to San Francisco Bay. The facilities are located at the City's treatment plant in Point Richmond and while jointly owned, they are operated by the City of Richmond (Veolia).

Design began in mid-2020 and construction started in the second half of 2021. Costs for this project are split 65 percent and 35 percent between the City of Richmond and West County Wastewater District (WCW), respectively.

On July 27, 2021, the City Council adopted Resolution No. 97-21, authorizing a construction contract with Veolia Water with a subcontract to Myers & Sons Construction for the upgrade of the Sodium Bisulfite (SBS) Facility and Chlorine Building at the Richmond Wastewater Treatment Plant. The total authorized amount was $6,429,791, which included a 15 percent contingency. The project was to be partially funded through the 2019A Wastewater Bonds and Wastewater Enterprise Funds. This project was identified as a critical Capital Improvement Project necessary for improving the quality of the treated water flowing into the San Francisco Bay.

Many issues and challenges were uncovered which could not have been foreseen until starting construction and proceeded with the necessary field work. The facilities were generally in poor condition, drawings and information (much of it 40 years or older) the project was bid on were not always complete or accurate and there were certain conditions uncovered that were previously unknown.

During the course of the project, eight change orders totaling $1,457,740 were necessary to address unforeseen conditions and additional required work, bringing the total project cost to $7,096,210. These changes were critical to the successful completion of the project and were within the expected contingencies for projects of this complexity and scale.

Project costs are detailed as follows:

A. Construction Contract Amount $5,638,470
B. Approved Change Orders $1,457,740
C. Total Project Cost $7,096,210
D. Prior Amount Approved by City Council (Res. 97-21) $6,429,791 Amount Outstanding $ 666,419
It is now proposed that the City Council adopt the resolution and accept this project as complete and authorize the allocation of an additional $666,419 from the Wastewater 912

Page 3 of 3 ends

June 25, 2024
Enterprise Fund to cover the costs associated with the approved change orders. This allocation will enable the final payments to be made to Veolia Water and close out the project financially.

The project has been completed within the scope, quality standards, and compliance requirements set forth by the City of Richmond and has significantly improved the functionality and environmental compliance of the wastewater treatment facility.

Staff is requesting Council approval of the project and payment of the outstanding balance.

DOCUMENTS ATTACHED:

Attachment 1 – Resolution
Attachment 2 – Resolution 97-21
Attachment 3 – SBS Tank list of Change Order costs
Attachment 4 – Veolia Task Authorizations (contract)
913
RESOLUTION NO. __24

A RESOLUTION OF THE COUNCIL OF THE CITY OF RICHMOND, CALIFORNIA,

TO ACCEPT THE COMPLETION OF THE UPGRADE OF THE SODIUM

BISULFITE (SBS) FACILITY AND CHLORINE BUILDING PROJECT AT THE

RICHMOND WASTEWATER TREATMENT PLANT AND TO ALLOCATE

ADDITIONAL FUNDS FOR CHANGE ORDERS
WHEREAS, the City Council of the City of Richmond approved the contract with Veolia Water West Operating Services, Inc. for the upgrade of the Sodium Bisulfite (SBS) Facility and Chlorine Building, under Resolution No. 97-21 dated July 27, 2021; and WHEREAS, the scope of work included upgrades to the SBS Facility and Chlorine Building that will help to improve the quality of the sewer treated water which flows from WWTP to the San Francisco Bay; and
WHEREAS, during the project execution, eight change orders totaling $1,457,740 were required to address unforeseen conditions and additional necessary work. The project construction contract unit prices are based on estimated engineering quantities. Actual payment is based on field measured quantitates installed by the contractor. According to the City’s inspection records, actual field measured quantities did not exceed the contract quantities. The quantities were paid in accordance with the bid unit prices of the contract and are not listed as over run quantities; and
WHEREAS, Status of the budget costs are as follows:

A. Construction Contract Amount (including markup )$5,628,470 B. Approved Change Orders $1,457,740
C. Total Project Costs (A+B) $7,096,210
D. Previously approved budget (Resolution. 97-21) $6,429,791 E. Amount requiring council approval (C-D) $666,419
WHEREAS, the project has been completed within the available budget (inclusive of change orders costs approved herein) and original contract time frame and in accordance with the plans, specifications, and City of Richmond standards; and WHEREAS, it is necessary to allocate additional funds from the Wastewater Enterprise Fund to cover these approved changes orders and to ensure the financial closure of the project; and
WHEREAS, the Water Resource Recovery Division of the Public Works Department will issue a project Task Authorization to Veolia and Veolia Water West Operating Services, Inc. who will manage the close-out of the subcontract with Myers & Sons Construction; NOW THEREFORE, BE IT RESOLVED by the City Council of the City of Richmond, as follows:
914
Section 1. The foregoing recitals are true and correct, and this City Council hereby so finds and determines:

Section 2. The City Council of the City of Richmond hereby accepts the construction of the Sodium Bisulfite (SBS) Facility and Chlorine Building upgrade project, CIP 01N10, completed by Veolia Water and subcontractor Myers & Sons Construction, authorizes the City Clerk to record the Notice of Completion with the Contra Costa County Recorder, and authorizes the City Engineer to release any applicable bonds and retention payments.

Section 3. The Water Resource Recovery Division of the Public Works Department shall appropriate funds from the Wastewater Enterprise Fund in the amount of $666,419 for Fiscal Year 2023-2024 budget for the upgrade of the Sodium Bisulfite (SBS) Facility and Chlorine Building Project.

Section 4. The Contract close-out shall be managed by Veolia Water for its subcontract issued to Myers & Sons Construction for the construction of the upgrade of the Sodium Bisulfite (SBS) Facility and Chlorine Building Project.

Section 5. The total cost of the upgrade of the Sodium Bisulfite (SBS) Facility and Chlorine Building Project for construction shall not exceed $7,096,210 without City Council approval.

Section 6. This resolution shall take effect immediately upon its passage. **********************
915
I hereby certify that the foregoing Resolution of the Council of the City of Richmond was duly passed and adopted at a meeting thereof held June 25, 2024, by the following vote:

AYES:

NOES:

ABSENT:

ABSTENTION:
___________PAMELA CHRISTIAN___________

CLERK OF THE CITY OF RICHMOND
Approved:

Mayor
Approved as to form:

City Attorney
916
RESOLUTION NO. 97-21
A RESOLUTION OF mE COUNCIL OF THE CITY OF RICHMOND, CALIFORNIA, FOR THE UPGRADE OF mE SODIUM BISULFITE (SBS) FACILITY AND CHLORINE

BUILDING LOCATED AT THE RICHMOND WASTEWATER TREATMENT PLANT FOR AN AMOUNT NOT TO EXCEED $6,429,791
WHEREAS, the upgrade of the Sodium Bisulfite (SBS) Facility and Chlorine Building project located at the Wastewater Treatment Plant (WWTP) in Richmond, was identified as one of the critical Capital Improvement Projects listed in the 2019A Wastewater Bonds that were adopted by the City Council on July 16, 2019; and
WHEREAS, the upgrade of the SBS Facility and Chlorine Building project will help to improve the quality of the sewer treated water which flows from WWTP to the San Francisco Bay; and
WHEREAS, on April30, 2021, the Water Resource Recovery Division of the City Public Works Department and Veolia Water West Operating Services, Inc. issued a Request for Bids to construction contractors for the construction project to upgrade the SBS Facility and Chlorine Building project through the City's BidsOnline system; and WHEREAS, sixty-six (66) firms received the Request for Bids, ofwhich four (4) contractors submitted Bids: Myers & Sons Construction (Sacramento), JMB Construction (South San Francisco), Valentine Corporation (San Rafael) and Shimmick Construction Co. Inc. (Oakland); and
WHEREAS, the four (4) contractor bids for construction that the City received were reviewed by City of Richmond Contract Compliance Officer Gina Baker, Retired Annuitant Yader A. Bermudez, and Veolia Water West Operating Services, Inc. Representative Steven Suskind (Senior Project Manager); and
WHEREAS, the panel of reviewers accepted the contractor bid of Myers & Sons Construction, finding that the team was highly qualified to upgrade the SBS Facility and Chlorine Building project; and
WHEREAS, the upgrade of the SBS Facility and Chlorine Building construction project total cost will be $6,429,791 [Project cost of$4,839,888, plus 16.5% Veolia mark-up of $798,5·82, plus 15% project contingency of$725;983, plus a (90/o Veolia mark-up of$65,338)]; and
WHEREAS, the Water Resource Recovery Division of the Public Works Department will issue a project Task Authorization to Veolia and Veolia Water West Operating Services, Inc. will manage the subcontract with Myers & Sons Construction.

NOW THEREFORE, BE IT RESOLVED by the City Council of the City of Richmond, as follows:

Section 1. The foregoing recitals are true and correct and this City Council hereby so finds and determines:

Section 2. The Water Resource Recovery Division of the Public Works Department shall appropriate funds from the 2019A Wastewater Bond proceeds in the amount of $6,429,791 for Fiscal Year 2021-22 budget for the upgrade of the Sodium Bisulfite (SBS) Facility and Chlorine Building Project.

Section 3. The Contract shall be managed by Veolia Water and a subcontract issued to Myers & Sons Construction for the construction of the upgrade of the Sodium Bisulfite (SBS) Facility and Chlorine Building Project.

Reso. No. 97-21

Page 1 ends

917
Section 4. The total cost of the upgrade of the Sodium Bisulfite (SBS) Facility and Chlorine Building Project for construction shall not exceed $6,429,791 [Project cost of $4,839,888, plus 16.5% Veolia mark-up of $798,582, plus 15% project contingency of $725,983, plus a (9% Veolia mark-up of $65.338)] without City Council approval.

Section 5. The amount ofVeolia's mark-up for the upgrade of the Sodium Bisulfite (SBS) Facility and Chlorine Building Project shall not exceed 16.5% on the base contract and 9% for any change orders.

Section 6. This resolution shall take effect immediately upon its passage. ******************
I certify that the foregoing resolution was passed and adopted by the City Council of the City of Richmond at a regular meeting thereof held July 27, 2021 , by the following vote:

AYES:

NOES:

ABSTENTIONS:

ABSENT:

Approved:

THOMAS K. BUTT
Mayor
Approved as to form:

TERESA STRICKER
City Attorney
State of California
County of Contra Costa
City of Richmond
}
}
Councilmembers Jimenez, Martinez, McLaughlin, Willis,
Vice Mayor Johnson III, and Mayor Butt.

None.

None.

Councilmember Bates.
: ss.

PAMELA CHRISTIAN

CLERK OF THE CITY OF RICHMOND
(SEAL)
I certify that the foregoing is a true copy of Resolution No. 97-21, finally passed and adopted by the City Council of the City of Richmond at a regular meeting held on July 27,2021.

Pamela Christian, Clerk of the City of Richmond
Reso. No. 97-21

Page 2 ends

918

CLERK'S CERTIFICATE
I, Pamela Christian, City Clerk of the City of Richmond, do hereby certify as follows:

The foregoing resolution is a full, true and correct copy of Resolution No. 97-21 duly adopted at a regular meeting of the City Council of said City duly and regularly held at the regular meeting place thereof on the 27th day of July, 2021, of which meeting all of the members of said City Council had due notice and at which a majority thereof were present; and that at said meeting said resolution was adopted by the following vote:

AYES:

NOES:

ABSTENTIONS:

ABSENT:

Councilmembers Jimenez, Martinez, McLaughlin, Willis,
Vice Mayor Johnson III, and Mayor Butt.

None.

None.

Councilmember Bates.

An agenda of said meeting was posted before said meeting at City Hall, 450 Civic Center Plaza in the City of Richmond, California, a location freely accessible to members of the public, and a brief description of said resolution appeared on said agenda.

I ha-ve carefully compared the foregoing' with the original on file and of record in my office, and the foregoing is a full, true and correct copy of the original resolution adopted at said meeting.

Said resolution has not been amended, modified or rescinded since the date of its adoption and the same is now in full force and effect.

Reso. No. 97-21

Page 3 ends

City
~~ Clerk of the City of Richmond
[SEAL]
919

WWTP SODIUM BISULFITE (SBS) TANK
AMOUNT Veolia Mark-up

16.5% TOTAL
Initial Contract Original Contract Amount $ 4,839,888 $ 798,582 $ 5,638,470 Contingency (15%) $ 725,983 $ 65,338 $ 791,322
Total amount approved by council via Resolution 97-21 $ 5,565,871 $ 863,920 $ 6,429,791

CHANGE ORDER
NUMBER DESCRIPTION AMOUNT Veolia Mark-up
(9%) TOTAL
Change Order 1 Chemical Building Skids and new doors $ 48,121 $ 4,331 $ 52,452 Change Order 2 Time Extension (no price increase $ - $ - $ - Change Order 3 Chemical Delivery System Adjustments due to low piping issues $ 54,483 $ 4,903 $ 59,386 Change Order 4 Multiple Design changes due to plumbing and piping issues $ 213,489 $ 19,214 $ 232,703 Change Order 5 Unexpected underground utility conflicts and duct bank issues $ 76,053 $ 6,845 $ 82,898 Change Order 6 Multiple change orders to accommodate chemical deliveries $ 238,429 $ 21,459 $ 259,888 Change Order 7 Installation of new analyzers for delivery system $ 94,938 $ 8,544 $ 103,482 Change Order 8 Programming telemetry system, installing power (not able to use solar), installation of extra safety equiment, replacing safety pumps $ 611,863 $ 55,068 $ 666,931 $ 1,337,376 $ 120,364 $ 1,457,740
$ 7,096,210
Amount outstanding $ (666,419)

TOTAL APPROVED CHANGE ORDERS
Total amount (Original Contract + Total Change Orders)
Attachment 3
920
921
Resolution 92-21 adopted by City Council 07/27/2021
Change Order within adopted budget.
04/22/2022
922
Adopted by City Council via Resolution 97-21 on 07/27/2021 Change Order within adopted budget.
923
Adopted by City Council via Resolution 97-21 on 07/27/2021 Change Order within adopted budget.
924
Adopted by City Council via Resolution 97-21 on 07/27/2021 Change Order within adopted budget.
925
(PAGE 2 OF 2)
Date:

VWNA Project #:

Scope of Services

COST SUMMARY
7,854.72
4,507.24
7,172.91
36,333.01
141,642.51
17,439.83
-1,461.10
Total 213,489.12
Veolia Markup Change Order
SUBTOTAL 16.50% 9.00% TOTAL
Contractor 4,839,888 4,839,888 798,582 5,638,469.52
Previous Change Orders 102,604 102,604 9,234 111,839
Change Order 4 213,489 213,489 19,214 232,703
TOTAL 5,155,981 - 5,155,981 798,582 28,448 5,983,011.17 Attachments
Exhibit 1 - PCO 002 KGV Potholing
Exhibit 2 - PCO 003 60" DE Ultrasonic Testing
Exhibit 3 - PCO 007 Truck Turnout Widening
Exhibit 4 - PCO 014 Veolia PCO 009 Confluence Structure Piping & 36" KGV per RFI 12.2 Exhibit 5 - PCO 018 Confluence Structure - Repl. EQ Panel, Canopy and Painting Exhibit 6 - PCO 019 SBS and SHC - Flowmeter and Air Valves Selection per DC 007 Exhibit 7 - PCO 020 Containment Area Coating Credit
Exhibit 8 - City Resolution 97-21
PCO 019 – SBS and SHC – Flowmeter and Air Valves Selection per DC 007 PCO 020 - Containment Area Coating Credit
PCO 002 – 36” KGV Potholing
PCO 003 – 60” DE Ultrasonic Testing
PCO 007 – Truck Turnout Widening
PCO 014 – Veolia PCO 009 - Confluence Struct. Piping & 36-inch KGV per RFI 12.2 PCO 018 – Confluence Structure – Replacement EQ Panel, Canopy, and Painting (CONT. )
(5) PCO 018: There is an existing wooden shack at the Plant that contains critical effluent equipment. However, the structure is very old, worn out due to the age of the structure and needs to be replaced. The shack is also in the way of the activities related to the removal of the knife gate valve (referenced above). Since it is in poor condition and cannot be rehabilitated, Veolia and Carollo evaluated and determined that the shack should be replaced. Therefore, a new metal canopy needs to be purchased (see attached rendering). The critical equipment then needs to be removed and set aside safely. Once the old structure is demolished and the new structure is in place, the equipment needs to be reinstalled into the new structure. All of this activity must be performed without shutting down the analyzers, for maintaining permit compliance. This PCO also includes costs associated with lead paint mitigation of the existing confluence structure above ground piping (see attached for details). The cost of these confluence structural changes is $141,642.51. (6) PCO 019: Design Clarification #7 (DC 007) directed the Contractor to modify the location and brand of the discharge flowmeters on both the SBS and Sodium Hypochlorite (SHC) systems and also add air relief valves and fittings to the proposed skids. These modifications will ensure good, reliable and safe operations. The modifications have resulted in extra work cost of $17,439.83.
(7) PCO 20 (credit): For the contract specified high performance coatings submittal, the Contractor found a designer approved equivalent to the specified coating system through Redwood Painting. The associated savings from the original bid amount is a minor credit to the City of (-$1,461.10).

Veolia has reviewed all of these proposals and agrees with the cost and schedule impacts put forth. Therefore, this TA requests an additional $213,489.12 in change order work (including Veolia's 9% mark up) for a total authorization amount of $5,983,011.17. This amount is within the City Council authority amount of $6,429,791, per Resolution 97-21 (attached).

TASK

AUTHORIZATION
WCWD - Richmond WWTP SBS Facility Improv. CHANGE ORDER 4 August 12, 2022 RE.0038
926
927
Resolution 97-21 adopted by City Council 07/31/2021
Change Order within adopted budget
01/30/2023
928
(PAGE 2 OF 2)
Date:

VWNA Project #:

Scope of Services

Page 2 ends

(CONT. )
(4) PCO 024 - Chemical deliveries are critical to the Plant's treatment process. As a result of the new SBS facility being built, the access roads were impacted in a way that the delivery trucks were hampered from safely delivering the chemicals. In order to remedy the situation and provide sufficient room for the trucks to maneuver, Veolia asked Carollo to issue a design clarification. Per DC 009 and supplemental RFI 059 response, Carollo provided information and details to fashion a new access road between the new SBS Containment Area and the west side of the Sodium Hypochlorite (SHC) tank farm for safe chemical unloading. The proposed cost is $160,938.14 (see attached). Veolia has reviewed this proposal and determined it is reasonable. (5) PCO 025 – In order to monitor and record the water level in the confluence structure, Veolia and West County requested Carollo to issue a design clarification specifying the procurement and installation of a level sensor. The cost to procure, install and commission the new level sensor is $47,289.40. Additionally, the Contractor is requesting an 84-day time extension for the fabrication of the new level sensor. (6) PCO 027 - During the contract work in the disinfection building, a technical instrumentation problem was discovered between existing SHC storage tank control panel and the new SHC PLC. Per RFI 056, SCADA Subcontractor Calcon Systems updated the loop drawings for the remote tank I/O panel and the SHC panel drawings with an updated disinfection building network drawing, resulting in an updated overall site network drawing. Carollo responded to RFI 056 with information to install additional conduits and wiring in the disinfection building. This also resulted in the Contractor providing additional coring for Mike Brown Electric in the SHC Disinfection Room. $6,924.82.

Veolia has reviewed all of these requested changes and agrees with the cost and schedule impacts put forth. Therefore, this TA requests an 18-day time extension and an additional $259,888.04 in change order work (including Veolia's 9% markup) for a total authorization amount of $6,325,797.47. This amount is within the City Council authority amount of $6,429,791, per Resolution 97-21 (attached).

TASK

AUTHORIZATION
WCWD-Richmond WWTP SBS Facility Improvements CHANGE ORDER 6 - Rev.1 November 17, 2022 RE.0038
929
Resolution 97-21 adopted by City Council 07/31/2021
Change Order within adopted budget
01/30/2023
930
931
932
933

Page 1 of 4 ends

June 25, 2024
Public Works
DATE: June 25, 2024
TO: Mayor Martinez and Members of the City Council
FROM: Daniel Chavarria, PE, Public Works Director
Robert Armijo, PE, Deputy Public Works Director / City
Engineer
Mary Phelps, Water Resource Division Manager
Subject: Emergency Justification for the Replacement of the Dornan Drive Force Main Sanitary Sewer Line
FINANCIAL IMPACT: There is no impact to the General Fund. The funding for this project will be paid from Wastewater Enterprise
Funds (40322931-400708-01Z10).

PREVIOUS COUNCIL
ACTION:

None.

STATEMENT OF THE
ISSUE:

City staff is recommending City Council authorize the
issuance of a task authorization to Veolia to award and manage subcontracts with W.R. Forde Construction, Inc.
and Questa Engineers to replace the Dornan Drive Force
Main Sanitary Sewer Line. The line has caused multiple
sanitary sewer overflows (SSOs) over the past several
years and needs to be replaced.

RECOMMENDED ACTION: ADOPT a resolution for the Emergency Justification authorizing Veolia Water to manage (on behalf of the City of Richmond) subcontracts with W.R. Forde Construction
for $2,726,808, Questa Engineers for $20,970, and a
contingency of $642,721, to replace the Dornan Drive
Force Main Sanitary Sewer Line in an amount which will
not exceed $3,390,500 - Public Works (Robert Armijo
510-620-5477/ Mary Phelps 510-621-1269)
AGENDA
REPORT
934

Page 2 of 4 ends

June 25, 2024
DISCUSSION:

Background
This project was urgently needed to fix an aging and leaky sanitary force main along Dornan Drive. The City was upgrading Ferry Point Pump Station to eventually accommodate potential development from Terminal 4 near Brickyard Cove.

Consequently, the upgrade would place the Dornan Drive force main under additional pressure potentially causing more sanitary sewer overflows. The goal was to complete the project before the Ferry Point Pump Station was operational in March 2024.

Several sanitary sewer overflows (SSO) have occurred on the force main sanitary sewer line on Dornan Road due to the line's age. The 2018 Baykeeper Settlement Agreement states that Richmond shall have no more than two (SSOs) from any two of the same sewer line segments or manhole/maintenance holes within any calendar year after December 31, 2024 (See Attachment 7). Additionally, the revised Sanitary Sewer System Waste Discharge Requirements (SSS-WDR) Executive Order WQ 2022-0103- DWQ prohibits any discharge from a sanitary sewer system, discharged directly or indirectly through a drainage conveyance system or other route, to waters of the State (See Attachment 8). To achieve this goal, the City must allocate annual capital funding to cover these mandated repairs' costs.

Solicitation
On June 9, 2023, the proposal for the Dornan Drive Sanitary Sewer Force Main Project was e-mailed by Veolia Water North America to the prospective bidders (See Attachment 2). On June 13, 2023, a mandatory walk-through was conducted with Veolia staff, and six participants attended. On July 6, 2023, five bids were received.

The bids received were as follows (in alphabetical order):

Contractor Contractor Bid Amount
JMB Construction, Inc. $3,157,288
Myers and Sons Construction, LLC $2,867,760
Ranger Pipelines, Inc. $2,549,710
Thompson Builders Corporation $3,329,334
W. R. Forde & Associates, Inc. $2,340,608
Bid analysis, conducted by City and Veolia staff, indicates that the lowest monetary bid is responsive and the bidder, W.R. Forde and Associates, Inc., is responsible. The bidder has the appropriate contractor’s license in active standing with the State of California and has completed similar projects for other public agencies. Questa Engineers also submitted an acceptable proposal for this project to provide compaction testing during construction.
935

Page 3 of 4 ends

June 25, 2024
Project Details and Considerations
Construction on a force main is more complex and complicated than working on a gravity-flow sanitary sewer line. The line is under constant pressure, and a bypass line must be installed. This can lead to complications based on Ferry Point pump station pump runs. Based on these unforeseen conditions that may be experienced in the field, the City is requesting a significant contingency amount of approximately 25 percent of the bid amount. This will allow the project to progress on time to meet the demands of the Baykeeper Settlement Agreement and remain in compliance with the State Waterboard’s Executive Order WQ 2022-0103-DWQ, which prohibits untreated sanitary sewage to waters of the state.

Dornan Drive Force Main Sanitary Sewer Line project broke ground in September 2023, and with Council approval it is set to be completed by late fall of 2024. The total estimated cost of this project, as awarded to the low bidder, is as follows:

A B C D
Dornan Drive
Project
Base Bid
Cost
Veolia Markup (16.5%)Contingency
(25%)
Veolia
Mark-up
(9%)
Total
WR Forde $ 2,340,608 $ 386,200 $ 585,152 $ 52,664 $ 3,364,624 Questa $ 18,000 $ 2,970 $ 4,500 $ 405 $ 25,875
Total Project
Cost $ 2,358,608 $ 389,170 $ 589,652 $ 53,069 $ 3,390,499 The project cost (A+B) of $2,747,778, with a contingency cost (C+D) of $642,721 total an overall project cost of $3,390,499.

Conclusion and Council Action
The project was authorized to proceed due to the emergency nature of the improvements required to prevent further sanitary sewer overflows and ensure compliance with the Baykeeper Settlement Agreement and State Waterboard’s Executive Order WQ 2022-0103-DWQ.

City staff is requesting City Council adopt the resolution emergency justification authorizing the Director of Public Works or his designee to issue task authorizations to Veolia for a total contract amount not to exceed $3,390,500 DOCUMENTS ATTACHED:

Attachment 1 – Resolution – Dornan Drive Force Main Sewer Replacement Project Attachment 2 – Prospective Bidders – Dornan Drive Force Main Sanitary Sewer Project Attachment 3 – Canvass of Bids - Dornan Drive Force Main Sewer Replacement Project Attachment 4 – Task Authorization – Dornan Drive Force Main Sewer Replacement Project
936

Page 4 of 4 ends

June 25, 2024
Attachment 5 – Resolution 84-19 Prequalified Vendors (Testing) Attachment 6 – Emergency Justification
Attachment 7 – Baykeeper Settlement Agreement
Attachment 8 – Executive ORDER WQ 2022-0103-DWQ
937
Reso. No.

Page 1 of 3 ends

RESOLUTION NO. ____

A RESOLUTION OF THE COUNCIL OF THE CITY OF RICHMOND, CALIFORNIA,

AUTHORIZING THE EMERGENCY JUSTIFICATION OF THE REPLACEMENT OF THE

DORNAN DRIVE SANITARY SEWER FORCE MAIN PROJECT IN THE RICHMOND

MUNICIPAL SEWER DISTRICT, SO AS TO PREVENT SANITARY SEWER OVERFLOWS AS

REQUIRED IN THE BAYKEEPER SETTLEMENT AGREEMENT AND THE CALIFORNIA

STATE WATER RESOURCES CONTROL BOARD SANITARY SEWER SYSTEM WASTE DISCHARGE REQUIREMENTS (SSS-WDR) IN AN AMOUNT NOT TO EXCEED $3,390,500 WHEREAS, the California State Water Resources Control Board issued ORDER WQ 2022-0103-DWQ, which states, “Any discharge from a sanitary sewer system, discharged directly or indirectly through a drainage conveyance system or other route, to waters of the State is prohibited”; and
WHEREAS, the City of Richmond (City) entered into a settlement agreement with San Francisco Baykeeper in 2018; and
WHEREAS, the City of Richmond agreed, as part of the settlement agreement with San Francisco Baykeeper, to make improvements to the City’s sewer collection system to ensure that the City would not have more than two (2) sanitary sewer overflows on any one (1) line segment by December 31, 2024; and
WHEREAS, the Dornan Drive sanitary sewer force main has had several sanitary sewer overflows from 2016 to March 3, 2023; and
WHEREAS, the most recent major sanitary sewer overflow on the Dornan Drive sanitary sewer force main occurred on December 31, 2022, due to a break in the line; and WHEREAS, the City performed point repairs to put the Dornan Drive sanitary sewer force main back in service; and
WHEREAS, the Water Resource Recovery Division of the Public Works Department determined that the Dornan Drive sanitary sewer force main had reached a critical stage requiring replacement; and
WHEREAS, Veolia Water North America, the City’s contractor suggested contacting several contractors that could perform work on sanitary sewer force mains; and WHEREAS, on June 9, 2023, nine (9) prospective bidders were e-mailed copies of the bid documents for the Dornan Drive Sanitary Sewer Force Main Project (the project); and WHEREAS, on June 13, 2023, six (6) bidders attended a mandatory pre-bid meeting at the Richmond Wastewater Treatment Plant for the project; and WHEREAS, on July 6, 2023, five (5) contractors submitted bids to Veolia Water Capital Project Management Group (in alphabetical order): JMB Construction, Inc (South San Francisco), Myers and Sons Construction, LLC (Sacramento), Ranger Pipelines, Inc. (San Francisco), Thompson Builders Corporation (Novato), and W. R. Forde & Associates, Inc. (Richmond); and
WHEREAS, City and Veolia staff reviewed the five (5) bids and determined that W.R.

Forde and Associates, Inc. was the lowest, responsive bid in the amount of $2,340,608; and WHEREAS, the project also calls for compaction testing during construction; and WHEREAS, Questa Engineering, one of the pre-qualified technical firms previously approved via Resolution 84-19, submitted an acceptable proposal for compaction testing during construction in the amount of $18,000 respectively; and WHEREAS, the total estimated cost of this project, as awarded to the low bidder, is as follows:
938
Reso. No.

Page 2 of 3 ends

Construction Contract $ 2,340,608
Contingency @ ~25% $ 589,652
Total Construction Cost $ 2,930,260
Design Support During Construction $18,000
Construction Management Cost (~16.5%) $ 389,171
Additional Veolia Fees (~9%) $53,069
Total Project Cost $3,390,500
WHEREAS, the Water Resource Recovery Division of the Public Works Department will issue a project Task Authorization to Veolia Water West Operating Services, Inc. (Veolia); and
WHEREAS, Veolia will manage the subcontracts with W.R. Forde and Associates, Inc. (contractor), and Questa Engineering (consultants).

NOW THEREFORE, BE IT RESOLVED that the City Council of the City of Richmond hereby authorizes the Water Resource Recovery Division of the Public Works Department to issue a project Task Authorization to Veolia for the Dornan Drive Sanitary Sewer Force Main Replacement Project, which will not exceed $3,390,500. [(WR Forde Project cost of $2,340,608 plus 16.5% mark-up of $ 386,201, plus 25% contingency of $585,152 plus 9% markup of $52,664 (total = $3,364,624); Questa Engineers Project Cost of $18,000, plus 16.5% markup of $2,970, plus 25% contingency of $4,500, plus 9% mark-up of $405 (total = $25,875). ******************
939
Reso. No.

Page 3 of 3 ends

I certify that the foregoing resolution was passed and adopted by the Council of the City of Richmond at a regular meeting thereof held on June 18, 2024, by the following vote:

AYES:

NOES:

ABSTENTIONS:

ABSENT:

CLERK OF THE CITY OF RICHMOND
(SEAL)
Approved:

Mayor
Approved as to form:

City Attorney
State of California }
County of Contra Costa : ss.

City of Richmond }
I certify that the foregoing is a true copy of Resolution No. _____, finally passed and adopted by the City Council of the City of Richmond at a regular meeting held on June 18, 2024.

Pamela Christian, Clerk of the City of Richmond
940
City of Richmond Public Works

DORNAN DRIVE SANITARY SEWER FORCE MAIN REPLACEMENT PROJECT

PROSPECTIVE BIDDERS
Company:

Bay Hawk
201 W Richmond Ave.

Richmond, CA 94801
JMB Construction
132 S Maple Ave.

South San Francisco, CA 94080
Nor-Cal Pipeline Services
983 Reserve Dr.

Roseville, CA 95678
Ranger Pipelines, Inc.
1790 Yosemite Ave.

San Francisco, CA 94124
W.R. Forde Associates
984 Hensley St.

Richmond, CA 94801
Shimmick
530 Technology Dr., Suite 300
Irvine, CA 92618
Myers & Sons
45 Morrison Ave.

Sacramento, CA 95838
Thompson Builders
5400 Hanna Ranch Road
Novato, CA 94945
D'Arcy & Harty
1300 Carroll Ave
San Francisco, CA 94124
941
450 Civic Center Plaza, Richmond, California 94804 • Office 510-620-6594 • Fax 510-307-8195

CANVASS OF BIDS
Water Resource Recovery Department
Date: July 6, 2023
Project: Dornan Drive Force Main Sewer Line Replacement Engineer’s
Estimate: $4,000,000
No of Bids
Received: 5
No. Name of Bidder (City) Total Bid Amount Apparent
Ranking
1 JMB Construction, Inc.
(South San Francisco) $3,157,288 4
2 Myers and Sons Construction, LLC
(Sacramento) $2,867,760 3
3 Ranger Pipelines, Inc.
(San Francisco) $2,549,710 2
4 Thompson Builders Corporation
(Novato) $3,329,334 5
5 W. R. Forde & Associates, Inc.
(Richmond) $2,340,608 1
6 7
8 9
10 11
12 13
14 15
942
943
944
945
946
947
948
949
950
951
952
953
954
955
956
957
958
959
960
961
962
963
964
965
966
967
968
969
970
971
972
973
974
975
976
977
978
979
980
981
982
983
984
985
986
987
988
989
990
991
992
993
994
995
996
997
998
999
1000
1001
1002
1003
1004
1005
1006
1007
1008
1009
1010
1011
1012
1013
1014
1015
1016
1017
1018
1019
1020
Stipulated Request for Entry of Settlement 1 Case No. 3:05-cv-03829-MMC 1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
Daniel Cooper (Bar No. 153576)
LAWYERS FOR CLEAN WATER, INC.
1004 O’Reilly Avenue
San Francisco, California 94129
Telephone: (415) 440-6520
Facsimile: (415) 440-4155
Email: [email protected]
Attorneys for Plaintiffs
SAN FRANCISCO BAYKEEPER and

WEST COUNTY TOXICS COALITION
Erica A. Maharg (Bar No. 279396)
Nicole C. Sasaki (Bar No. 298736)

SAN FRANCISCO BAYKEEPER
1736 Franklin Street, Suite 800
Oakland, California 94612
Telephone: (510) 735-9700
Facsimile: (510) 735-9160
Email: [email protected]
Email: [email protected]
Attorneys for Plaintiff

SAN FRANCISCO BAYKEEPER

UNITED STATES DISTRICT COURT

NORTHERN DISTRICT OF CALIFORNIA
SAN FRANCISCO BAYKEEPER, a non-profit
corporation, and WEST COUNTY TOXICS
COALITION, a non-profit organization,
Plaintiffs,
v.

CITY OF RICHMOND, a municipal corporation,
Defendant.

Civil Case No.: 3:05-cv-03829-MMC

PLAINTIFFS AND DEFENDANT CITY
OF RICHMOND’S STIPULATED
REQUEST FOR ENTRY OF 2018

SETTLEMENT AGREEMENT,
TERMINATION OF 2006

SETTLEMENT AGREEMENT, AND
TO VACATE HEARING; [PROPOSED]
ORDER
The Honorable Maxine M. Chesney
Order
;
Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 1 of 126 1021
Stipulated Request for Entry of Settlement 2 Case No. 3:05-cv-03829-MMC 1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
WHEREAS, on October 19, 2006, Plaintiffs San Francisco Baykeeper (“Baykeeper”) and West County Toxics Coalition (collectively, “Plaintiffs”) and Defendant City of Richmond (“Richmond”) (collectively, “Parties”) settled Plaintiffs’ 2005 Clean Water Act citizen suit via settlement agreement (Docket Nos. 29; 32-1 (the “2006 Settlement Agreement”)), and the Court retained jurisdiction over specified claims for the sole purpose of resolving any dispute between the Parties in relation to the enforcement of the terms of the 2006 Settlement Agreement. (Docket Nos. 32; 43.); WHEREAS, on October 16, 2017, Plaintiffs filed a Motion for an Order Finding Richmond in Civil Contempt of Court (“Motion”) alleging violation of the terms of the 2006 Settlement Agreement. (Docket No. 38.). On October 27, 2017, upon request of the Parties, this Court continued the briefing and hearing on Plaintiffs’ Motion to allow the Parties to hold a settlement conference. (Docket No. 43.); WHEREAS, the Parties previously stipulated, and this Court previously ordered, that the original Termination Date of the 2006 Settlement Agreement should be extended as to Richmond, and the current expiration date of the Parties’ 2006 Settlement Agreement is June 9, 2018. (Docket Nos. 34, 35, 40, 43.);
WHEREAS, Paragraph 10 of the 2006 Settlement Agreement specifies that the agreement shall terminate within the applicable time period “so long as all payments, fees, and costs due under or pursuant to th[e] [2006] Settlement Agreement, including, but not limited to, provisions governing Supplemental Environmental Projects, Attorney’s Fees and Costs, and Dispute Resolution, have been paid in full.” (Docket No. 32-1 at ¶10.);
WHEREAS, based upon stipulation of the Parties as a result of settlement discussions, (Docket No. 50), on March 13, 2018, this Court ordered that a Notice of Settlement be filed no later than March 30, 2018, that the briefing schedule and hearing on Plaintiffs’ Motion be held off-calendar while the Parties finalize settlement documents, and that on or before May 29, 2018, after the close of the 45-day settlement review period set forth in 40 C.F.R. §135.5 with the United States Environmental Protection Agency (“EPA”) and the United States Department of Justice (“DOJ”) without objection, the Parties shall file their settlement-related documents, or alternatively, provide this Court with a status update with respect to this Court’s October 27, 2017 Order to set a hearing and briefing schedule (Docket No. 43) on Plaintiffs’ Motion. (Docket No. 52.);
;
Order
Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 2 of 126 1022
Stipulated Request for Entry of Settlement 3 Case No. 3:05-cv-03829-MMC 1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
WHEREAS, on March 30, 2018, the Parties filed a Notice of Settlement, notifying the Court that the Parties had reached a full settlement to resolve all outstanding issues in this action (“2018 Settlement Agreement” attached as Exhibit A to the [Proposed] Order filed concurrently herewith), and Plaintiffs served copies of the 2018 Settlement Agreement via U.S. Mail to DOJ and EPA for a mandatory 45-day review period under 33 U.S.C. § 1365(c)(3) and 40 C.F.R. § 135.5. (Docket No. 53.); WHEREAS, on May 21, 2018, DOJ notified the Court and the Parties that it does not object to the entry of the 2018 Settlement Agreement. (Docket. No. 54.); WHEREAS, the Parties now agree: (1) to terminate the 2006 Settlement Agreement (Docket Nos. 29; 32-1) concurrently with this Court’s approval and entry of the Order retaining jurisdiction to enforce compliance by the Parties with the terms of the 2018 Settlement Agreement, as that may occur before the 2006 Settlement Agreement’s current expiration date of June 9, 2018 (Docket Nos. 34, 35, 40, 43); and (2) that all terms and conditions for termination of the 2006 Settlement Agreement, including those conditions specified in Paragraph 10 of the 2006 Settlement Agreement, have been paid and satisfied in full;
WHEREFORE, the Parties also hereby provide this Court with their settlement-related documents (the 2018 Settlement Agreement, as noted above) as required by this Court’s March 13, 2018 Order (Docket No. 52);
WHEREFORE, the Parties hereby stipulate and request that the Court: (1) approve and enter the [Proposed] Order of the Court retaining jurisdiction over the Parties for the sole purpose of enforcing compliance by the Parties with the terms of the 2018 Settlement Agreement until the 2018 Settlement Agreement terminates; (2) terminate the 2006 Settlement Agreement (Docket Nos. 29 and 32-1) in its entirety upon this Court’s approval and entry of the [Proposed] Order; and (3) dismiss Plaintiffs’ Motion with prejudice and vacate the associated hearing and briefing schedule (Docket Nos. 38 and 43); and WHEREFORE, the Parties hereby stipulate and request the Court to approve and enter the [Proposed] Order attached hereto.
///
///
///
;
Order
Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 3 of 126 1023
Stipulated Request for Entry of Settlement 4 Case No. 3:05-cv-03829-MMC 1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
Respectfully Submitted,
Dated: May 24, 2018
By: /s/ Nicole C. Sasaki
Nicole C. Sasaki
Attorney for Plaintiff

SAN FRANCISCO BAYKEEPER
Dated: May 24, 2018
By: /s/ Daniel Cooper
Daniel Cooper
Attorney for Plaintiffs
SAN FRANCISCO BAYKEEPER and

WEST COUNTY TOXICS COALITION
Dated: May 24, 2018

DOWNEY BRAND LLP
By: / s/ Nicole E. Granquist (auth. to e-sign 05/24/18) Nicole Granquist
Attorney for Defendant

CITY OF RICHMOND
Order
;
Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 4 of 126 1024
Stipulated Request for Entry of Settlement 5 Case No. 3:05-cv-03829-MMC 1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
[PROPOSED] ORDER
IT IS HEREBY ORDERED that the Court shall retain jurisdiction over the Parties for the sole purpose of enforcing compliance by the Plaintiffs and Defendant with the terms of the 2018 Settlement Agreement, attached hereto as Exhibit A, until the 2018 Settlement Agreement terminates.

IT IS FURTHER ORDERED that the Parties’ 2006 Settlement Agreement (Docket Nos. 29 and 32-1) is terminated.

IT IS FURTHER ORDERED that Plaintiffs’ Motion for an Order Finding Richmond in Civil Contempt of Court (“Motion”) (Docket No. 38) is dismissed with prejudice, and the associated hearing and briefing schedule on Plaintiffs’ Motion is vacated (Docket No. 43).

IT IS SO ORDERED.

Dated: _________________, 2018
The Honorable Maxine M. Chesney
United States Senior District Court Judge
June 4
The Honorable Maxine M. Chesney
United States Senior District Court Jud
;
Order
Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 5 of 126 1025
Exhibit A
Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 6 of 126 1026
Settlement Agreement 1 Case No. 3:05-cv-03829 MMC
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
Daniel Cooper (Bar No. 153576)
LAWYERS FOR CLEAN WATER, INC.
1004 O’Reilly Avenue
San Francisco, California 94129
Telephone: (415) 440-6520
Facsimile: (415) 440-4155
Email: [email protected]
Attorneys for Plaintiffs
SAN FRANCISCO BAYKEEPER and

WEST COUNTY TOXICS COALITION
Erica A. Maharg (Bar No. 279396)
Nicole C. Sasaki (Bar No. 298736)

SAN FRANCISCO BAYKEEPER
1736 Franklin Street, Suite 800
Oakland, California 94612
Telephone: (510) 735-9700
Facsimile: (510) 735-9160
Email: [email protected]
Email: [email protected]
Attorneys for Plaintiff

SAN FRANCISCO BAYKEEPER
Additional Counsel on Following Page

UNITED STATES DISTRICT COURT

NORTHERN DISTRICT OF CALIFORNIA
SAN FRANCISCO BAYKEEPER, a non-profit
corporation, and WEST COUNTY TOXICS
COALITION, a non-profit organization,
Plaintiffs,
v.

CITY OF RICHMOND, a municipal corporation,
Defendant.

Civil Case No. 3:05-cv-03829 MMC

SETTLEMENT AGREEMENT
Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 7 of 126 1027
Settlement Agreement 2 Case No. 3:05-cv-03829 MMC
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28

DOWNEY BRAND LLP
NICOLE E. GRANQUIST (Bar No. 199017)
PATRICK F. VEASY (Bar No. 301456)
621 Capitol Mall, 18th Floor
Sacramento, CA 95814-4731
Telephone: 916.444.1000
Facsimile: 916.444.2100
[email protected]
[email protected]
Attorneys for Defendant

CITY OF RICHMOND
Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 8 of 126 1028
Settlement Agreement 3 Case No. 3:05-cv-03829 MMC
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
2018 SETTLEMENT AGREEMENT
This Settlement Agreement (hereinafter, “2018 Settlement Agreement”) entered into by Plaintiffs San Francisco Baykeeper and West County Toxics Coalition (“Plaintiffs”) and Defendant City of Richmond (“Richmond”) (collectively, the “Parties”), supersedes and replaces all prior settlement agreements or amendments to settlement agreements in this action. The 2018 Settlement Agreement is entered into by the Parties with respect to the following facts, objectives, and commitments:

WHEREAS, Plaintiffs are non-profit corporations dedicated to, among other things, the protection and enhancement of the water quality of the San Francisco Bay-Delta Estuary and to protect the communities of West Contra Costa County against toxic threats in the area; WHEREAS, Richmond owns a publicly-owned treatment works, which includes a treatment works and sanitary sewer collection system that collects, treats, and discharges wastewater generated by residential, commercial, and industrial sources, pursuant to California Regional Water Quality Control Board, San Francisco Bay Region, (“Regional Board”) Order No. R2-2013-0016, National Pollutant Discharge Elimination System (“NPDES”) Permit No. CA0038539 (the “2013 Joint Permit”).

WHEREAS, on October 17, 2006, the Parties entered into a settlement agreement to informally resolve specified claims in Baykeeper and West County Toxics Coalition v. City of Richmond, West County Wastewater District, Veolia North America Operating Services, and West County Agency, United States District Court for the Northern District of California, Civil Case No. 05- 03829 MMC (hereinafter, the “2006 Settlement Agreement”); WHEREAS, on October 16, 2017, Plaintiffs filed with the Court a Motion for an Order Finding Richmond in Civil Contempt of Court (“Motion”), alleging violations of the 2006 Settlement Agreement;
NOW, THEREFORE, in, consideration of the mutual covenants and agreements contained herein and for other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged by the Parties, Plaintiffs and Richmond hereby agree as follows:

Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 9 of 126 1029
Settlement Agreement 4 Case No. 3:05-cv-03829 MMC
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
I. GENERAL OBJECTIVES

1. The objectives of this 2018 Settlement Agreement are:
a. To ensure that Richmond continues to improve efforts to comply with the Federal Water Pollution Control Act, 33 U.S.C. § 1251, et seq. (“Clean Water Act” or “CWA”); b. To ensure that Richmond continues to use, implement, and improve ways, means, and methods to prevent or reduce sanitary sewer overflows (“SSOs”); and c. To further the goals and objectives of the CWA.

II. DEFINITIONS

2. Unless otherwise expressly defined herein, terms used in this 2018 Settlement Agreement, which are defined in the CWA or in regulations or rules promulgated under the CWA, have the meaning assigned to them in the applicable statutes, regulations, or rules. Whenever terms listed below are used in this 2018 Settlement Agreement, the following definitions apply:
a. “FOG” means fats, oil, and grease.
b. “2018 Settlement Agreement” means this Settlement Agreement and any attachments or documents incorporated by reference into this 2018 Settlement Agreement. c. “Collection System” means the sewer pipes and lines, manholes or maintenance holes, pump stations, and all appurtenances thereto under ownership of Richmond Municipal Sewer District No. 1 that are used to convey wastewater generated by residential, commercial, and industrial sources to the Richmond Wastewater Treatment Plant. Richmond’s Collection System is currently operated and maintained under contract by Veolia Water West Operating Services (“Veolia”). d. “Sewer line segment” means any section of publicly owned sewer line or pipe located between: (1) two manholes/maintenance holes; (2) a pump station and a manhole/maintenance hole; (3) a pump station or a manhole/maintenance hole and a headworks structure; or (4) a sewer line or pipe otherwise identifiable as a discrete section.
e. “Day” means a calendar day. In computing any period of time under this 2018 Settlement Agreement, where the last day of such period is a Saturday, Sunday, or Federal or State Holiday, the period runs until the close of business on the next day that is not a Saturday, Sunday, or Federal or State Holiday.

Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 10 of 126 1030
Settlement Agreement 5 Case No. 3:05-cv-03829 MMC
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
f. “Design Storm” means the 10-year, 24-hour storm event occurring across the entire area served by Richmond’s collection system with wet antecedent soil conditions. g. “Sanitary Sewer Overflows,” “overflow,” or “SSO” has the same meaning as that term is defined in Section A.1. of the Statewide General Waste Discharge Requirements for Sanitary Sewer Systems, State Water Resources Control Board Order No. 2006-0003 (hereinafter the “SSO General WDR”), or any amendment thereto, and which currently means: “any overflow, spill, release, discharge or diversion of untreated or partially treated wastewater from a sanitary sewer system. SSOs include (i) overflows or releases of untreated or partially treated wastewater that reach waters of the United States; (ii) overflows or releases of untreated or partially treated wastewater that do not reach waters of the United States; and (iii) wastewater backups into buildings and on private property that are caused by blockages or flow conditions within the publicly owned portion of a sanitary sewer system.” For purposes of this definition, the term “waters of the United States” has the meaning as set forth in 40 C.F.R. section 122.2.
h. “2013 Joint Permit” means NPDES Permit No. CA0038539, Order No. R2-2013-0016, as presently constituted and/or as subsequently revised or renewed. i. “Inflow” means wastewater or water that may enter a collection system through unpermitted connections, drains, or manholes.
j. “Infiltration” means groundwater, rainwater, or other surface water that may enter a collection system through its pipes, joints, or cracks. k. “System Evaluation and Capacity Assurance Plan” or “SECAP” means one or more documents or databases containing the information required by Section VIII of this 2018 Settlement Agreement.

III. JURISDICTION AND VENUE

3. This Court has jurisdiction over the subject matter of the claims asserted by Plaintiffs pursuant to CWA section 505(a), 33 U.S.C. § 1365(a), and 28 U.S.C. §§ 1331, 1355, and 1367. Venue is proper in this judicial district pursuant to CWA sections 309(b), 505(c), 33 U.S.C. §§ 1319(b), 1365(c), and 28 U.S.C. §§ 1391(b) and (c). The Parties waive all objections that they may have to the Court’s jurisdiction to enter and enforce this 2018 Settlement Agreement.

Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 11 of 126 1031
Settlement Agreement 6 Case No. 3:05-cv-03829 MMC
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
IV. EFFECT OF 2018 SETTLEMENT AGREEMENT

4. Plaintiffs do not, by their consent to this 2018 Settlement Agreement, warrant or aver in any manner that Richmond’s compliance with this 2018 Settlement Agreement will constitute or result in compliance with any Federal or State law or regulation. Nothing in this 2018 Settlement Agreement shall be construed to affect or limit in any way the obligation of Richmond to comply with all Federal, State and local laws and regulations governing any activity required by this 2018 Settlement Agreement.

5. Neither this 2018 Settlement Agreement, nor any payment pursuant to the 2018 Settlement Agreement, shall constitute evidence or be construed as a finding, adjudication, or acknowledgement of any fact, law, or liability, nor shall it be construed as an admission of violation of any law, rule, regulation, permit, or administrative order by Richmond. However, this 2018 Settlement Agreement and/or any payment pursuant to the 2018 Settlement Agreement may constitute evidence in actions seeking to enforce compliance with this 2018 Settlement Agreement. Richmond maintains and reserves all defenses it may have to any alleged violations that may be raised in the future.

V. APPLICABILITY

6. This 2018 Settlement Agreement addresses all violations alleged by the Plaintiffs in their Motion.

7. The Parties certify that their undersigned representatives are fully authorized to enter into this 2018 Settlement Agreement, to execute it on behalf of the Parties, and to legally bind the Parties to its terms.

8. The Parties, including any successors or assigns, agree to be bound by this 2018 Settlement Agreement and not to contest its validity in any subsequent proceeding to implement and enforce its terms. No change in ownership or corporate or other legal status of Richmond or any transfer of Richmond’s assets or liabilities shall in any way alter the responsibilities of Richmond or any of its successors or assigns thereof, under this 2018 Settlement Agreement.

VI. EFFECTIVE DATE AND TERMINATION DATE

9. Effective Date: The Effective Date of this 2018 Settlement Agreement shall be the date of the Order entering the Stipulated Request for Entry of Settlement Agreement described in Section XX of Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 12 of 126 1032
Settlement Agreement 7 Case No. 3:05-cv-03829 MMC
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
this 2018 Settlement Agreement.

10. Term of 2018 Settlement Agreement: This 2018 Settlement Agreement shall continue in effect until July 15, 2028 (the “Term”) at which time, the 2018 Settlement Agreement, and all obligations under it, shall automatically terminate, unless one of the Parties has invoked Dispute Resolution in accordance with Section XVI of the 2018 Settlement Agreement.

VII. SSO STANDARDS

11. Richmond shall meet the following SSO Reduction Performance Goals each calendar year:

Calendar Year Maximum Number of
SSOs per 100 Miles of
Sewer Line/Year
2018 20
2019 15
2020 13
2021 11
2022 10
2023 9
2024 8
2025 7
2026 5
2027 5

12. Richmond shall eliminate capacity-related SSOs from the Collection System, except SSOs caused by storm events exceeding the Design Storm, in accordance with the following schedule:
a. Richmond shall eliminate capacity-related SSOs from areas of Richmond’s Collection System addressed by the projects listed in Paragraph 20 below, as depicted on Attachment F, on or before July 15, 2024, except such SSOs caused by storm events exceeding the Design Storm. b. Richmond shall further eliminate all capacity-related SSOs from Richmond’s Collection system on or before July 15, 2026, except such SSOs caused by storm events exceeding the Design Storm.
c. If Richmond identifies additional capital projects required to eliminate capacity-related SSOs in the SECAP described in Paragraph 17 below, the Parties shall meet and confer to negotiate a revised schedule to ensure capacity-related SSOs are eliminated during the term of this 2018 Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 13 of 126 (27) (24) (20) (18) (16) (15) (13) (9) (9) (37)
1033
Settlement Agreement 8 Case No. 3:05-cv-03829 MMC
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
Settlement Agreement. Disputes as to the engineering feasibility of any proposed schedule for implementation of those additional capacity projects shall be subject to the Dispute Resolution provisions in Section XVI below.

13. Richmond shall have no more than two (2) SSOs from any two of the same sewer line segments or manhole/maintenance holes within any calendar year after December 31, 2024.

14. The standards required by Paragraphs 11-13, above, are collectively referred to as “SSO Standards.”

15. For purposes of determining compliance with the SSO Reduction Performance Goals, the maximum number of SSOs per 100 miles of sewer line per calendar year can be averaged over the entire Collection System, and SSOs caused by storm events exceeding the Design Storm shall not be counted.

16. For purposes of initially calculating the SSO Reduction Performance Goals, the Parties assume Richmond currently has 197 miles of sewer line in its Collection System. For purposes of calculating the SSO Reduction Performance Goals, the total allowable SSOs for the year shall be rounded using standard rounding as follows: 16.1 through 16.4 is considered 16, and 16.5 through 16.9 is considered

17. For example, for the year 2027, using the current sewer line mileage of 197 for Richmond, Richmond would be allowed 10 SSOs [(1.97 x 5 = 9.85) (9.85 => 10)].

VIII. CAPACITY-RELATED ANALYSIS AND CAPITAL IMPROVEMENTS

17. Within ninety (90) days of obtaining the data from the Flow Monitoring Program described in paragraph 17.a. herein, but in any case no later than July 15, 2019, Richmond shall complete an updated System Evaluation and Capacity Assurance Plan (“Revised SECAP”), in accordance with the following requirements:
a. The Revised SECAP shall use flow monitoring data collected by Richmond during its Flow Monitoring Program. The Flow Monitoring Program shall collect data on a system-wide basis, so as to allow for analysis in the Revised SECAP of the impact of tidal inflow, dry-weather groundwater infiltration, and rain induced inflow and infiltration in the Collection System. Subject to the conditions set forth below, the Flow Monitoring Program shall also include data collection sufficient to analyze the hydraulic capacity of Richmond’s Collection System in the locations of capacity-related Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 14 of 126 1034
Settlement Agreement 9 Case No. 3:05-cv-03829 MMC
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
improvement projects contained, but not yet completed, in the 2011 Master Plan, as described in Paragraph 20 of this 2018 Settlement Agreement, including the projected impact of those completed capacity improvement projects. The Flow Monitoring Program shall consist of two separate actions.

First, by December 1, 2018, provided rainfall has occurred in the thirty (30) days prior to December 1, 2018, Richmond shall install temporary flow meters in the Collection System, as needed, to provide sufficient data to perform a hydraulic analysis that: (1) identifies all capacity deficiencies in the Collection System, including locations predicted by the hydraulic model to result in SSOs during the Design Storm, and (2) assesses the projected impacts on the hydraulic capacity of the Collection System from the completed capacity improvement projects from the 2011 Master Plan identified in Paragraph 20 below, tidal inflow, dry-weather groundwater infiltration, and rain induced inflow and infiltration on the Collection System. The data collected during the Flow Monitoring Program shall be used to update, calibrate, and validate Richmond’s current hydraulic model. If no rainfall has occurred in the thirty (30) days prior to December 1, 2018, Richmond shall instead install temporary flow meters in the Collection System after rainfall of one (1) inch or more has occurred in a 24-hour period.

Once installed, the temporary flow meters will remain installed through March 31, 2019. Second, when the following condition is present between December 1, 2022 and March 31, 2023 or December 1, 2023 and March 31, 2024, Richmond will install temporary flow meters for a second time to obtain flow data for the 2024 SECAP described below: rainfall has occurred in the thirty (30) days prior to December 1, 2022 or December 1, 2023; or if no rainfall has occurred in the thirty (30) days prior to December 1, 2022 or December 1, 2023, rainfall of one (1) inch or more has occurred in a 24-hour period.
b. The Revised SECAP shall identify all measures needed to attain the capacity necessary to convey the Design Storm without capacity-related SSOs in Richmond’s Collection System. The Revised SECAP shall evaluate whether the MacDonald and Virginia, 1st Street Phase 1, and 1st Street Phase 2 projects described in Paragraph 20 herein (“Reevaluated Projects”), which were identified in the 2011 Master Plan, remain priority capacity projects or whether other projects identified while developing the Revised SECAP are higher priority. A higher priority project is determined by the reduction in the number of capacity-related SSOs the project is expected to result in, as reflected by Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 15 of 126 1035
Settlement Agreement 10 Case No. 3:05-cv-03829 MMC
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
Richmond’s SSO records and the hydraulic analysis described in Paragraph 17.a. c. The Revised SECAP shall include an implementation schedule to complete all measures needed to attain the capacity necessary to convey the Design Storm without capacity-related SSOs in the Collection System by July 15, 2026 or alternative date agreed upon by the Parties pursuant to Paragraph 12.c. The implementation schedule shall incorporate the schedule set forth in Paragraph 20, unless a reprioritization of those projects is needed to assure a systematic program (e.g., to assure that downstream sewer lines are upsized prior to upstream lines). If Richmond believes reprioritization is necessary, Richmond shall set forth its justification in the Revised SECAP. In any case, Richmond shall complete all projects identified in Paragraph 20 by June 30, 2024. d. The Revised SECAP shall include a hydraulic analysis that includes calculation for all sewer lines and all pump stations of estimated dry weather wastewater flow, estimated peak wet weather wastewater flow under the Design Storm, and other storm event scenarios, and total wastewater flow capacity when flowing full. The hydraulic analysis will be based on the flow monitoring data collected by Richmond during its Flow Monitoring Program. The model used in the hydraulic analysis will be calibrated and validated to verify its accuracy in predicting flows in the Collection System using data collected through the Flow Monitoring Program. The hydraulic analysis shall be sufficient to identify all capacity improvements necessary to convey peak wet weather flows during the Design Storm to the wastewater treatment plant without capacity-related SSOs in the Collection System. Findings of the hydraulic analysis shall be presented on a GIS system map, where feasible, or other database.
e. To aid the hydraulic analysis, Richmond shall maintain an updated, accurate inventory of the Collection System in a GIS system map. The GIS system map shall include all Collection System attributes required for the hydraulic modeling and further shall include system attributes that will facilitate Collection System operation and maintenance. System attributes shall include the following:
sewer line diameters and lengths; sewer line slope; service area covered by line segment; sewer line year of construction, pipe material, inspection history, cleaning history, SSO history, repair history; conflicting utilities; proximity to storm sewer(s), in feet; whether a sewer line is located in a right of way or an easement; manhole locations, depth, lid size, manhole diameter, rim elevation, and invert Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 16 of 126 1036
Settlement Agreement 11 Case No. 3:05-cv-03829 MMC
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
elevation; and pump station mechanical, electrical, and instrument data.

18. Richmond shall provide Plaintiffs, in electronic format, the Revised SECAP and the associated GIS mapping on or before July 15, 2019. Plaintiffs shall have forty-five (45) days from receipt to comment on the Revised SECAP. Richmond shall incorporate Plaintiffs’ comments, or explain in writing why Plaintiffs’ comments were not accepted, within thirty (30) days of Richmond’s receipt of the comments. Disputes as to the adequacy of the Revised SECAP to eliminate all capacity-related spills on or before July 15, 2026 or alternative date agreed upon by the Parties pursuant to Paragraph

12.c. shall be subject to the Dispute Resolution provisions in Section XVI of this 2018 Settlement Agreement.

19. Within one hundred twenty (120) days of completing the Revised SECAP, but no later than December 31, 2019, Richmond shall complete an update to the 2011 Master Plan incorporating the project list and schedule from the Revised SECAP (“Updated Master Plan”) and seek City Council approval of the Updated Master Plan. The project list in the Updated Master Plan shall include capacity-related improvement projects included in the 2011 Master Plan, provided still necessary and appropriate after the Revised SECAP has been performed, and all capacity-related improvement projects identified by the Revised SECAP.

20. At a minimum, Richmond shall fund and complete the following capacity-related capital improvement projects identified in the 2011 Master Plan on the following schedule:

Capacity-Related Capital Improvement Project Deadline
13th Street August 31, 2018
Cutting and Carlson December 31, 2019
Hoffman Blvd. December 31, 2019
MacDonald & Virginia June 30, 2021
1st Street Phase 1 June 30, 2023
1st Street Phase 2 June 30, 2024
If the Reevaluated Projects have been replaced by higher priority projects as described in Paragraph

17.b, Richmond shall fund and complete those higher priority projects by July 15, 2024, unless the Parties mutually agree in writing, after meeting and conferring, that a different schedule is warranted.

21. Beginning July 31, 2018 and on an ongoing bi-annual basis (i.e., on January 30 and July 31) for the term of this 2018 Settlement Agreement, Richmond shall provide Plaintiffs with bi-annual Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 17 of 126 1037
Settlement Agreement 12 Case No. 3:05-cv-03829 MMC
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
reports regarding the design, funding, and construction status of all capacity-related capital improvement projects.

22. At least once every five (5) years from the date the Revised SECAP set forth in Paragraph 17 was completed, Richmond shall reevaluate and update the hydraulic analysis of the Collection System to reflect any changes in Collection System conditions, conditions or factors relevant to volumes of system rainfall-derived Infiltration and Inflow (“RDI/I”), dry weather infiltration, added service connections, or land-use patterns that would affect peak wet weather flows in the Collection System, the hydraulic capacity of the Collection System, and the ability of the Collection System to convey peak flows during the Design Storm without capacity-related SSOs. The 5-year update to the hydraulic analysis will rely upon data collected as part of a subsequent Flow Monitoring Program consistent with Paragraph 17.a., performed during the wet season prior to submission date of the 5-year update.

The 5-year update to the hydraulic analysis of Richmond’s Collection System will be consistent with the requirements in Paragraph 17 and shall assess the projected impact of completed capacity improvement projects from the Revised SECAP on the hydraulic capacity of the Collection System.

Richmond shall update the Revised SECAP by incorporating the updated hydraulic analysis. On or before October 15, 2024, Richmond shall provide Plaintiffs, in electronic format, the updated 2024 SECAP. Plaintiffs shall have forty-five (45) days from receipt to comment on the updated 2024 SECAP. Richmond shall incorporate Plaintiffs’ comments or explain in writing why Plaintiffs’ comments were not accepted within thirty (30) days of Richmond’s receipt of the comments. Disputes as to the adequacy of the updated 2024 SECAP to achieve the SSO Standards required shall be subject to the Dispute Resolution provisions in Section XVI of this 2018 Settlement Agreement.

IX. COLLECTION SYSTEM CONDITION ASSESSMENT AND RISK ASSESSMENT

ANALYSIS

23. Richmond shall ensure that, by June 30, 2018, all gravity sewer main lines and, by October 1, 2018, all force main sewer lines in Richmond’s Collection System have had their condition assessed within the last ten years. Condition assessment for gravity sewer lines shall be based on Closed Circuit Television (“CCTV”) inspection and shall employ the Sewer Line Condition Grading Matrix attached hereto as Attachment A. For force main sewer lines, condition assessment shall employ technologies Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 18 of 126 1038
Settlement Agreement 13 Case No. 3:05-cv-03829 MMC
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
suitable by industry standards appropriate to the pipe material, the physical conditions encountered, and the operational parameters under which the force main assessment must be conducted, as defined in the U.S. EPA guidance document “Condition Assessment of Wastewater Collection Systems – white paper,” EPA/600/R-09/049, May 2009, attached hereto as Attachment E.

24. Throughout the term of this 2018 Settlement Agreement, Richmond shall implement a Condition Assessment Program that employs a minimum ten (10) year CCTV re-inspection cycle for all gravity sewer lines and more frequent CCTV inspection of gravity sewer main line “hot spots” as mandated by the Sewer Line Condition Grading Matrix defect score for the sewer line in issue. Force main sewer lines shall be re-inspected on the cycle defined in Table 2-1: of Attachment E.

25. No later than March 31, 2018, Richmond shall complete an updated Risk Assessment Analysis (“2018 Risk Assessment Analysis”) for all gravity sewer main lines in the Collection System rated as Grades 4 and 5 pursuant to the Pipeline Assessment and Certification Program (“PACP”).

26. On or before March 31, 2018, Richmond shall provide Plaintiffs, in electronic format, the 2018 Risk Assessment Analysis. Plaintiffs shall have forty-five (45) days from receipt to comment on the 2018 Risk Assessment Analysis. Richmond shall incorporate Plaintiffs’ comments or explain in writing why Plaintiffs’ comments were not accepted within thirty (30) days of Richmond’s receipt of the comments. Disputes as to the adequacy of the 2018 Risk Assessment Analysis to achieve the SSO Standards shall be subject to the Dispute Resolution provisions in Section XVI of this 2018 Settlement Agreement.

27. Within thirty (30) days of receipt of Plaintiffs’ comments on the 2018 Risk Assessment Analysis, Richmond shall incorporate the results of the analysis into its Collection System Rehabilitation/Repair schedule, set out in Section X below.

28. By January 15, 2019, and annually thereafter, Richmond shall perform an updated Risk Assessment Analysis on all gravity sewer line segments in Richmond’s Collection System rated Grade 4 or 5 via the PACP process and update the Rehabilitation/Repair schedule based on its results.

29. For the term of this 2018 Settlement Agreement, on or before January 15 of each year after 2018, Richmond shall provide Plaintiffs, in electronic format, that year’s updated Risk Assessment Analysis. Plaintiffs shall have forty-five (45) days from receipt to comment on the updated Risk Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 19 of 126 1039
Settlement Agreement 14 Case No. 3:05-cv-03829 MMC
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
Assessment Analysis. Richmond shall incorporate Plaintiffs’ comments or explain in writing why Plaintiffs’ comments were not accepted within thirty (30) days of Richmond’s receipt of the comments. Disputes as to the adequacy of the updated Risk Assessment Analysis to inform a program sufficient to achieve the SSO Standards shall be subject to the Dispute Resolution provisions in Section XVI of this 2018 Settlement Agreement.

X. REPAIR, REPLACEMENT, AND REHABILITATION

30. On or before April 30, 2018, Richmond shall fund and complete construction of the partially collapsed pipe located along South 23rd Street. Within ten (10) days of completion, Richmond shall provide Plaintiffs written confirmation.

31. Within ten (10) years of the Effective Date of this 2018 Settlement Agreement, Richmond shall repair or replace approximately thirty-one miles of Grade 5 gravity sewer line, initially identified in the 2018 Risk Assessment Analysis as follows:
a. 4.8 miles of PACP rated Grade 5 gravity sewer line will be repaired or replaced as part of the13th Street, Cutting and Carlson, Hoffman Blvd., and South 23rd Street projects described in Paragraphs 20 and 30 of this 2018 Settlement Agreement; b. 6.2 miles of PACP rated Grade 5 gravity sewer line will be repaired or replaced as part of the MacDonald & Virginia, 1st Street Phase 1, and 1st Street Phase 2 projects described in Paragraph 20 of this 2018 Settlement Agreement; and
c. At least 20 miles of PACP rated Grade 5 gravity sewer line will be repaired or replaced at an approximate rate of at least 2 miles of gravity sewer line per year, based on a rolling 5-year average. Compliance with this requirement will be assessed beginning on July 1, 2018 (so the first year is July 1, 2018 through June 30, 2019). The specific Grade 5 gravity sewer lines identified in the 2018 Risk Assessment Analysis may change over time (some of the initial Grade 5 gravity sewer lines may be removed from the list because they are determined not to be Grade 5 after further investigation, and new Grade 5 gravity sewer lines may be added to future Risk Assessment Analyses due to continued aging of the Collection System); Richmond is compliant with this Paragraph if Richmond satisfies the mileage specified. Further, if Richmond achieves compliance with the SSO Reduction Performance Goals in Paragraph 11 of this 2018 Settlement Agreement, such attainment Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 20 of 126 1040
Settlement Agreement 15 Case No. 3:05-cv-03829 MMC
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
can be the basis for extending the deadline for repairing or replacing the remaining Grade 5 gravity sewer lines. The Parties shall meet and confer upon Richmond’s request, and Plaintiffs shall consider Richmond’s request in good faith.

32. During the term of this 2018 Settlement Agreement, on or before July 31 of each year, Richmond shall report to Plaintiffs, in electronic format, documenting the completion of the annually required repairs to Grade 5 sewer line segments.

XI. COLLECTION SYSTEM OPERATIONS AND MAINTENANCE

33. On or before March 31, 2018, Richmond shall revise Veolia’s July 2013 Operations and Maintenance Plan (“2018 O&M Plan”) as follows:
a. Detail procedures used during cleaning for trapping debris, roots, and FOG and quantifying the amount of debris, roots, and FOG removed during cleaning, including but not limited to, identifying the debris trap type and standardized methodology used by Richmond during cleaning; b. Adhere to the specific cleaning frequencies and response actions in the Cleaning Frequency Response Matrix, attached hereto as Attachment D;
c. Require that cleaning of gravity sewer line segments by Richmond shall include use of a fixed hydro-flushing nozzle centering device (i.e., a nozzle skid) having a minimum of four (4) endpoints with a diameter within one (1) inch of the diameter of the gravity sewer line segment being cleaned to ensure the cleaning was effective. A gravity sewer line shall be considered adequately cleaned if the device passes through the entire sewer line segment, from manhole to manhole. If passage of the device from manhole to manhole in the gravity sewer line segment is restricted by conditions in the gravity sewer line segment, the gravity sewer line segment shall be inspected by CCTV to determine the cause of the restriction. Richmond shall maintain a list of all gravity sewer line segments where structural conditions do not permit the passage of the device and incorporate that information in its GIS map of the Collection System. Response to the findings on the structural condition of the sewer line segment from the post-proofing CCTV inspection shall be in accordance with Attachment B or D, as appropriate. If the inability of the device to pass results from insufficient cleaning, the gravity sewer line segment shall be re-cleaned until CCTV inspection confirms that the debris, root, or FOG accumulation has been removed from the sewer line segment. In addition, the Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 21 of 126 1041
Settlement Agreement 16 Case No. 3:05-cv-03829 MMC
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
gravity sewer line segment shall be assigned the appropriate cleaning rating as per the Cleaning Frequency Response Matrix, attached hereto as Attachment D; and, d. Detail the components of the cleaning Quality Assurance/Quality Control (“QA/QC”) program consisting of post-cleaning CCTV inspection of cleaned gravity sewer lines to ensure proper and complete cleaning of Richmond’s gravity sewers (“QA/QC inspection”) and a standardized response procedure when gravity sewer line segments fail the QA/QC inspection sufficient to address cleaning program inadequacies (i.e., identifying performance issues, providing training, increasing QA/QC inspection rates to ensure cleaning effectiveness). At least ten percent (10%) of gravity sewer segments cleaned each month shall be spot checked via CCTV inspection to ensure adequate cleaning.

A QA/QC inspection shall be considered a failure if FOG/Root/Debris accumulation are observed in the sewer segment after cleaning operations. Cleaning crews that are associated with failed QA/QC inspections shall be provided additional training in proper cleaning methods and shall be provided additional oversight in the form of increased QA/QC inspections of their cleaning operations to ensure proper and complete cleaning of Richmond’s sewers.

34. On or before March 31, 2018, Richmond shall provide Plaintiffs, in electronic format, the 2018 O&M Plan. Plaintiffs shall have forty-five (45) days from receipt to comment on the 2018 O&M Plan.

Richmond shall incorporate Plaintiffs’ comments or explain in writing why Plaintiffs’ comments were not accepted, within thirty (30) days of Richmond’s receipt of the comments. Disputes as to the adequacy of the 2018 O&M Plan as an element of Richmond’s Collection System program described in this 2018 Settlement Agreement to achieve the SSO Standards shall be subject to the Dispute Resolution provisions in Section XVI of this 2018 Settlement Agreement.

35. Sewer Line Cleaning: Richmond shall clean all gravity sewer lines in Richmond’s Collection System at least once every four (4) calendar years and clean designated gravity sewer line segments more frequently as warranted by its Hot Spot Cleaning Program attached hereto as Attachment C.

36. On or before March 31, 2018, and on or before July 15 for each year thereafter during the term of this 2018 Settlement Agreement, Richmond shall complete a quantitative analysis of the effectiveness of the root foaming program to prevent root related SSOs in pipes where root foaming is performed (“Root Foaming Analysis”). Based on the results of the Root Foaming Analysis, Richmond Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 22 of 126 1042
Settlement Agreement 17 Case No. 3:05-cv-03829 MMC
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
shall modify the root foaming program to include additional pipes with observed root intrusion problems or a history of root related SSOs, or transfer funds used for root foaming to other O&M activities (e.g., increased cleaning), as needed to meet the SSO Standards.

37. On or before March 31, 2018, and on or before July 15 for each year thereafter, Richmond shall provide Plaintiffs, in electronic format, the Root Foaming Analysis, including recommended program changes. Plaintiffs shall have forty-five (45) days from receipt to comment on the Root Foaming Analysis. Richmond shall incorporate Plaintiffs’ comments or explain in writing why Plaintiffs’ comments were not accepted, within thirty (30) days of Richmond’s receipt of the comments. Disputes as to the adequacy of the Root Foaming Analysis as an element of Richmond’s Collection System program described in this 2018 Settlement Agreement to achieve the SSO Standards shall be subject to the Dispute Resolution provisions in Section XVI of this 2018 Settlement Agreement.

38. On or before March 31, 2018, and on an ongoing basis thereafter during the term of this 2018 Settlement Agreement, Richmond shall complete an update to the Hot Spot Cleaning List to include cleaning frequencies adequate to reduce blockage related SSOs sufficient to achieve SSO Standards (e.g., bi-monthly, monthly), and adjust cleaning frequencies based on the Cleaning Frequency Response Matrix, attached hereto as Attachment D. Adjustments to cleaning frequencies, including but not limited to, cleaning observations of “Moderate” or “Heavy” debris, roots, or FOG will result in an increase in cleaning frequency to the next highest frequency (e.g., six (6) months to three (3) months).

Adjustments to cleaning frequencies, including but not limited to, a change in cleaning observation from “Moderate” or “Heavy” after three (3) consecutive cleanings to “Clear” will result in the cleaning frequency being reduced to the next lowest cleaning frequency (e.g., three (3) months to six (6) months). No reduction in cleaning frequency for a sewer line segment with a previous history of SSOs in the past five (5) calendar years shall occur without the approval of Richmond’s Water Resource Recovery Director, except where a sewer line segment has been repaired and/or replaced, in which case, the sewer line segment can be removed from the Hot Spot Cleaning List.

39. On or before March 31, 2018, and each year thereafter for the term of this 2018 Settlement Agreement, Richmond shall provide Plaintiffs, in electronic format, the updated Hot Spot Cleaning Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 23 of 126 1043
Settlement Agreement 18 Case No. 3:05-cv-03829 MMC
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
List, including recommended program changes. Plaintiffs shall have forty-five (45) days from receipt to comment on the Hot Spot Cleaning List. Richmond shall incorporate Plaintiffs’ comments, or explain in writing why Plaintiffs’ comments were not accepted, within thirty (30) days of Richmond’s receipt of the comments. Disputes as to the adequacy of the cleaning frequency to achieve the SSO Standards shall be subject to the Dispute Resolution provisions in Section XVI of this 2018 Settlement Agreement.

XII. FATS, OILS, AND GREASE CONTROL

40. On or before December 31, 2017, Richmond shall continue to implement an educational outreach program to residents of Richmond (i.e., public school presentations, flyers or other public advertisements, or provision of free FOG disposal receptacles) designed to curtail the discharge of FOG from residences to Richmond’s Collection System.

41. On or before April 30, 2018, and on or before July 15 of each year thereafter, Richmond shall complete a quantitative analysis of commercial and residential FOG sources, and relative contribution to Richmond’s FOG-related SSOs (i.e., identify recalcitrant food service establishments (“FSE”), multi-unit housing, etc.).

42. On or before April 30, 2018, Richmond shall complete an update to the FOG Control Program to target the primary sources of FOG into Richmond’s Collection System including but not limited to:
a. Public outreach/education, including door hangers, mailers, refrigerator magnets, and grease scrapers, to all locations identified as sources of residential FOG to Richmond’s Collection System;
b. Perform surprise inspections and increase routine inspections at FSEs that are in areas that are primary sources of FOG to Richmond’s Collection System on a quarterly basis; and c. Inspect FSEs and FOG generating properties (e.g., schools, nursing homes, churches) at a minimum frequency of once per year.
d. Within five (5) days of completion, Richmond shall provide Plaintiffs written confirmation.

Richmond shall provide the updated FOG Control Program procedures within fourteen (14) days of receipt of a written request from Plaintiffs.

43. By April 30, 2018, Richmond shall update its FOG Inspection Procedures to reduce the Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 24 of 126 1044
Settlement Agreement 19 Case No. 3:05-cv-03829 MMC
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
timeframe for re-inspection of FSEs as follows:
• FSE receiving a score equal to or more than 3 shall be re-inspected at least once every calendar year;
• FSEs receiving a score of 2 shall be re-inspected quarterly on a surprise basis until the facility achieves a score equal to or greater than 3; and
• FSEs that receive a score of 1 shall be re-inspected at least once every month on a surprise basis until the facility achieves a score equal to or greater than 3.

FSEs shall be graded per the scoring system on a scale of 1-5 with 1 being the least compliant facilities. A “failed inspection” is one in which an FSE receives a score 1 or 2.

44. On or before April 30, 2018, Richmond staff shall propose to the City Council for incorporation into Richmond Municipal Code Chapter 12.18 the following specific procedures in response to the results of FSE inspections:
a. After one (1) failed inspection, issue Notice of Violation (“NOV”) and increase inspection per the frequency established in Paragraph 43;
b. After two (2) or more failed inspections, issue a citation and administrative fine in accordance with subsection (g) and conduct surprise inspection per the frequency established in Paragraph 43;
c. Fines escalate if the same violation occurs within 365 days as follows: $250 fine for first citation; $500 fine for second citation; and $1,000 fine for third citation. d. Within five (5) days of modification to the Richmond Municipal Code as detailed above, Richmond shall provide Plaintiffs written confirmation.

45. By April 30, 2018, Richmond and Veolia shall create a procedure by which: (1) City staff conducting FSE inspections report the locations of violations to Veolia staff maintaining Richmond’s Collection System to inform the cleaning schedule; and (2) Veolia staff maintaining Richmond’s Collection System report areas with high volumes of FOG buildup to inform Richmond’s FSE inspections.

46. On or before April 30, 2018, and July 15 of each year thereafter for the term of this 2018 Settlement Agreement, Richmond shall provide Plaintiffs, in electronic format, the quantitative Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 25 of 126 1045
Settlement Agreement 20 Case No. 3:05-cv-03829 MMC
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
analysis of commercial and residential FOG sources, including any changes to the FOG Control Program as an element of Richmond’s Collection System program described in this 2018 Settlement Agreement sufficient to achieve the SSO Standards. Plaintiffs shall have forty-five (45) days from receipt to comment on the quantitative FOG Sources analysis. Richmond shall incorporate Plaintiffs’ comments or explain in writing why Plaintiffs’ comments were not accepted, within thirty (30) days of Richmond’s receipt of the comments. Disputes as to the adequacy of the FOG sources analysis and the FOG Control Program as an element of Richmond’s Collection System program described in this 2018 Settlement Agreement to achieve the SSO Standards shall be subject to the Dispute Resolution provisions in Section XVI of this 2018 Settlement Agreement.

XIII. SSO REPORTING AND RESPONSE

47. On or before March 31 of each calendar year during the term of this 2018 Settlement Agreement, Richmond shall provide Annual SSO Summary Reports to Plaintiffs. Such reports shall set forth a narrative summary, a table of SSOs for the calendar year prior, and a comparison to the SSO Standards, including that calendar year’s SSO Reduction Performance Goals. The reports shall provide the information for SSOs required by State Board Monitoring and Reporting Program, Order No. 2006-0003-DWQ, amended by Order No. WQ 2013-0058-EXEC, which includes:
a. Location of SSO by GPS coordinates (if available) or street address; b. Whether or not the SSO entered a drainage channel and/or surface water; c. Whether or not the SSO was discharged to a storm drain pipe that was not fully captured and returned to the sanitary sewer system;
d. Estimated SSO volume in gallons;
e. Estimate of SSO volume in gallons that reached surface water, a drainage channel, or was not recovered from a storm drain;
f. Estimate of SSO volume in gallons recovered;
g. SSO source (manhole, cleanout, etc.);
h. SSO cause (mainline blockage, roots, etc.);
i. Time of SSO notification or discovery;
j. Estimated operator arrival time;
Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 26 of 126 1046
Settlement Agreement 21 Case No. 3:05-cv-03829 MMC
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
k. SSO destination;
l. Estimated SSO end time; and
m. Final SSO Identification (ID) Number.

48. For SSOs that equal or exceed one thousand (1,000) gallons, which result in a discharge to a drainage channel and/or surface water, or discharge to a storm drainpipe that was not fully captured and returned to the sanitary sewer system, the Annual SSO Summary Reports shall include all information listed above as well as:
a. Response and corrective action taken;
b. If samples were taken, identify which regulatory agencies received sample results (if applicable). If no samples were taken, N/A must be indicated. c. Parameters that samples were analyzed for (if applicable); d. Identification of whether or not health warnings were posted; e. Beaches impacted (if applicable). If no beach was impacted, N/A must be indicated; f. Whether or not there is an ongoing investigation;
g. Steps taken or planned to reduce, eliminate, and prevent recurrence of the overflow and a schedule of major milestones for those steps;
h. Office of Emergency Services (“OES”) control number (if applicable); i. Date OES was called (if applicable);
j. Time OES was called (if applicable);
k. Identification of whether or not County Health Officers were called; l. Date County Health Officer was called (if applicable); and m. Time County Health Officer was called (if applicable).

49. The Annual SSO Summary Reports shall also include a summary of the capital improvements completed in Richmond’s Collection System during the calendar year, and the total cost associated with each capital expenditure. In addition, the Annual SSO Summary Reports shall include any changes to the total amount of sewer line in Richmond’s Collection System that will affect calculation of the allowable SSO Reduction Performance Goals.

Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 27 of 126 1047
Settlement Agreement 22 Case No. 3:05-cv-03829 MMC
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
XIV. SSO REDUCTION ACTION PLAN

50. If Richmond documents SSOs in excess of the SSO Reduction Performance Goals of this 2018 Settlement Agreement in its Annual SSO Summary Report, Richmond shall submit to Plaintiffs, on or before July 31 of that year, an SSO Reduction Action Plan that specifies the actions taken in the prior calendar year pursuant to this 2018 Settlement Agreement and additional measures to be taken, which are sufficient to achieve compliance with the SSO Standards in future years. The SSO Reduction Action Plan shall include a schedule for implementation of all actions proposed.

51. Plaintiffs shall provide Richmond with all recommended revisions to the SSO Reduction Action Plan within thirty (30) days of receipt of such Plan. Richmond shall indicate within thirty (30) days of receipt of Plaintiffs’ recommended revisions whether Richmond accepts any such recommendations for revision, and if so, Richmond shall within thirty (30) days revise the SSO Reduction Action Plan in accordance with Plaintiffs’ recommendations. If Richmond does not accept Plaintiffs’ recommendations, any party may seek Formal Dispute Resolution process pursuant to Section XVI of this 2018 Settlement Agreement. To the extent the Parties do not dispute original provisions or recommended revisions, Richmond shall implement all undisputed provisions or revisions. After the Parties have reached agreement on the SSO Reduction Action Plan or after Formal Dispute Resolution resolves any dispute concerning the SSO Reduction Action Plan, Richmond shall implement the SSO Reduction Action Plan as a requirement of this 2018 Settlement Agreement.

52. All actions and measures discussed in an SSO Reduction Action Plan shall become enforceable requirements under this 2018 Settlement Agreement. The SSO Reduction Action Plan shall consist of a quantitative analysis of the increased level of effort for each program element described in this 2018 Settlement Agreement necessary to achieve compliance with SSO Standards. If additional funding to accomplish the program elements identified is unnecessary, then Richmond shall explain in the SSO Reduction Action Plan why it is unnecessary. If additional funding is necessary, Richmond shall seek such funding and set forth in the SSO Reduction Action Plan any potential funding sources to be used or sought. If Richmond seeks financing, but is unsuccessful, Richmond will disclose in the SSO Reduction Action Plan the extent of their efforts (e.g., copies of applications, amount sought, from whom, reasons for rejection).

Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 28 of 126 1048
Settlement Agreement 23 Case No. 3:05-cv-03829 MMC
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
XV. FEES, COSTS, EXPENSES, AND COMPLIANCE MONITORING FUNDS

53. Reimbursement of Fees and Costs: To help defray Plaintiffs’ attorneys, consultants, and expert fees and costs, and any other costs incurred as a result of investigating, filing, and negotiating resolution of Plaintiffs’ Motion, Richmond shall provide to Plaintiffs a total of three hundred and ten thousand dollars ($310,000.00). The total fees and costs payment shall be made payable to “Baykeeper” addressed to 1736 Franklin Street, Suite 800, Oakland, California 94612 within thirty (30) days after the Effective Date.

54. Compliance Monitoring Funds: To compensate Plaintiffs for time spent by legal staff or technical consultants reviewing compliance reports and any other documents, Richmond shall provide to Plaintiffs thirty thousand dollars ($30,000.00) in 2018 and 2019. For all other years during the term of this 2018 Settlement Agreement, Richmond shall provide to Plaintiffs fifteen thousand dollars ($15,000) per year thereafter for costs and fees associated with annual monitoring of Richmond’s compliance with this 2018 Settlement Agreement through the termination date of this 2018 Settlement Agreement. The first annual compliance monitoring fund payment shall be made payable to “Baykeeper” addressed to 1736 Franklin Street, Suite 800, Oakland, California 94612 within thirty (30) days after the Effective Date, and annually on or before January 1 of each following year during the term of this 2018 Settlement Agreement.

XVI. BREACH OF AGREEMENT AND DISPUTE RESOLUTION PROCEDURES

55. Force Majeure: Richmond shall notify Plaintiffs pursuant to the terms of this Paragraph, where implementation of the requirements set forth in this 2018 Settlement Agreement, becomes impossible, despite the timely good-faith efforts of Richmond, due to circumstances beyond the control of Richmond or its agents, and which could not have been reasonably foreseen and prevented by the exercise of due diligence by Richmond. Any delays due to inadequate program funding, Richmond’s failure to make timely and bona fide applications and to exercise diligent efforts to obtain permits, or normal inclement weather shall not, in any event, be considered to be circumstances beyond Richmond’s control.
a. If Richmond claims impossibility, it shall notify Plaintiffs in writing within ten (10) days of the date that Richmond first knew of the event or circumstance or should have known of the event or Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 29 of 126 1049
Settlement Agreement 24 Case No. 3:05-cv-03829 MMC
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
circumstance by the exercise of due diligence and shall describe the reason for the non-performance.

Richmond’s notice shall specifically refer to this Paragraph of this 2018 Settlement Agreement and describe the anticipated length of time the delay may persist, the cause or causes of the delay, the measures taken or to be taken by Richmond to prevent or minimize the delay, the schedule by which the measures will be implemented, and the anticipated date of compliance. Richmond shall adopt all reasonable measures to avoid and minimize such delays.
b. The Parties shall meet and confer in good faith concerning the non-performance and, where the Parties concur that the non-performance was or is impossible, despite the timely good faith efforts of Richmond, due to circumstances beyond the control of Richmond that could not have been reasonably foreseen and prevented by the exercise of due diligence by Richmond, new performance requirements or deadlines shall be established.
c. If Plaintiffs disagree with Richmond’s notice, or in the event that the Parties cannot timely agree on the terms of new performance deadlines or requirements, either Party shall have the right to invoke the Formal Dispute Resolution process pursuant to Section XVI of this 2018 Settlement Agreement. In such proceeding, Richmond shall bear the burden of proving that any delay of any requirement of this 2018 Settlement Agreement was caused or will be caused by force majeure and the extent of any delay attributable to such circumstances.

56. Delays due to inadequate program funding, notwithstanding the good faith efforts of Richmond to secure funding, can be the basis for extending deadlines beyond the current term of this 2018 Settlement Agreement for any additional capacity-related project identified in the SECAP prepared pursuant to this 2018 Settlement Agreement. Richmond must notify Plaintiffs as soon as possible if it believes that a delay will occur due to inadequate program funding. In the notification, Richmond shall submit to Plaintiffs all documents showing its efforts to secure adequate program funding, shall explain how Richmond intends to secure adequate program funding, and propose an alternative deadline for compliance. Plaintiffs have the right to request, and Richmond shall provide, any documents related to Richmond’s notification. The Parties shall meet and confer within ten (10) days of Richmond’s notification, unless the Parties otherwise agree on a different schedule. Plaintiffs shall consider Richmond’s request in good faith but have no obligation to modify any requirement in this Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 30 of 126 1050
Settlement Agreement 25 Case No. 3:05-cv-03829 MMC
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
2018 Settlement Agreement due to inadequate program funding.

57. Alternative Dispute Resolution: The dispute-resolution procedure set forth below shall be the exclusive mechanism for resolving disputes between the Parties with regard to any aspect of this 2018 Settlement Agreement.

58. Informal Dispute Resolution. The Parties agree to engage in Informal Dispute Resolution pursuant to the terms of this paragraph:
a. Meet and Confer: If a dispute under this 2018 Settlement Agreement arises, or any party believes that a breach of this Agreement has occurred, the Parties shall meet and confer (telephonically or in-person) within ten (10) days of receiving written notification of a request for such meeting.

During the meet and confer proceeding, the Parties shall discuss the dispute and make best efforts to devise a mutually agreed upon plan, including implementation dates, to resolve the dispute. The Parties may, upon mutual written agreement, extend the time to conduct the meet and confer discussions beyond ten (10) days.
b. If any Party fails to meet and confer within the timeframes set forth in Paragraph 58.a. or the meet and confer does not resolve the dispute, after at least ten (10) days have passed after the meet and confer occurred or should have occurred, either party shall be entitled to initiate the Formal Dispute Resolution procedures as outlined in Paragraph 59 below.

59. Formal Dispute Resolution: The Parties agree that any action or proceeding which is brought by any Party against any other Party pertaining to, arising out of, or related to the requirements of this 2018 Settlement Agreement shall first utilize the Informal Dispute Resolution procedures set forth in the preceding Paragraph, and, if not successful, the Parties shall utilize the Formal Dispute Resolution proceedings in this Paragraph. The Parties agree that Formal Dispute Resolution shall be initiated by filing a Motion to Show Cause or other appropriately named motion (“Dispute Motion”) in District Court, before Judge Chesney, to determine whether either Party is in breach of this 2018 Settlement Agreement and, if so, to require the breaching Party to remedy any breach identified by the District Court within a reasonable time frame. The party filing any such Dispute Motion may request expedited review of the Dispute Motion. If Judge Chesney is not available to perform the role identified herein, the Parties agree that the Dispute Motion shall be re-assigned pursuant to applicable Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 31 of 126 1051
Settlement Agreement 26 Case No. 3:05-cv-03829 MMC
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
rules of the District Court. The prevailing or substantially prevailing party in the Formal Dispute Resolution proceeding shall receive its reasonable costs and attorney’s fees incurred in both Informal and Formal Dispute Resolution in accordance with the standard established by § 505 of the Clean Water Act, 33 U.S.C. §1365.

XVII. STIPULATED PAYMENTS

60. If Richmond knows that a report will be submitted late, Richmond shall notify the Plaintiffs by telephone or email no later than two (2) business days before the report’s due date.

61. Richmond shall pay the following stipulated payments during the Term of this 2018 Settlement Agreement:
a. $500 per day after the due date that Richmond fails to timely submit any document, report, or other communication required in this 2018 Settlement Agreement; and b. $500 per day for every day after the due date that Richmond fails to timely submit any payments due under Paragraphs 53-54 of this 2018 Settlement Agreement.

62. In the case of a late report, Richmond shall send Plaintiffs the report per Section XVIII.

Plaintiffs shall notify Richmond of receipt of the late report, and shall include an invoice for the amount of the stipulated payment, if any, due and payable. Richmond shall contact Plaintiffs within ten (10) business days if Richmond disagrees with Plaintiffs’ stipulated payment calculation and may meet and confer with Plaintiffs or invoke other proceedings regarding the stipulated payments pursuant to Section XVI of this 2018 Settlement Agreement. Otherwise, Richmond shall pay any stipulated payments due pursuant to this 2018 Settlement Agreement within thirty (30) days after receipt of the Plaintiffs’ invoice itemizing the stipulated payment liability.

63. All payments of stipulated payments described above shall be paid by Richmond via overnight mail to: “Rose Foundation for Communities and the Environment,” 201 4th Street, Suite 102, Oakland, California 94607, Attn: Tim Little. Copies and/or notice of payment shall be sent concurrently to Plaintiffs to the addresses and via the methods set forth in Section XVIII.

XVIII. NOTICES AND SUBMISSIONS

64. Correspondence. Any notices, documents, or correspondence pertaining to this 2018 Settlement Agreement shall be, to the extent feasible sent via electronic mail transmission to the eCase 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 32 of 126 1052
Settlement Agreement 27 Case No. 3:05-cv-03829 MMC
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
mail addresses listed below, or if electronic mail transmission is not feasible, via certified U.S. Mail with return receipt, or by hand delivery as follows:

If to Plaintiffs:

Erica A. Maharg
Nicole C. Sasaki
San Francisco Baykeeper
1736 Franklin Street, Suite 800
Oakland, CA 94612
Telephone: (510) 735-9700
Email: [email protected]
Email: [email protected]
Daniel Cooper
Lawyers for Clean Water
1004A O’Reilly Avenue
San Francisco, CA 94129
Telephone: (415) 440-6520
Email: [email protected]
If to Richmond:

Everett Jenkins
City of Richmond, City Attorney’s Office
450 Civic Center Plaza
Richmond, CA 94804
Telephone: (510) 620-6509
Email: [email protected]
Ryan Smith
City of Richmond
450 Civic Center Plaza
Richmond, CA 94804
Telephone: (510) 620-5846
Email: [email protected]
Nicole Granquist

DOWNEY BRAND LLP
621 Capitol Mall, 18th Floor
Sacramento, CA 95814
Telephone: (916) 444-1000
Email: [email protected]

65. Notifications and communications shall be deemed submitted on the date transmitted via email or postmarked and sent by first-class mail or deposited with an overnight mail/delivery service.

66. Richmond also agrees to make available to Plaintiffs any documents reasonably necessary to Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 33 of 126 1053
Settlement Agreement 28 Case No. 3:05-cv-03829 MMC
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
evaluate system performance and/or compliance with this 2018 Settlement Agreement within thirty (30) days of written request by Plaintiffs.

67. During the term of this 2018 Settlement Agreement, Richmond shall preserve at least one (1) legible copy of all records and documents, including computer-stored information, in its possession, which relate to its performance of its obligations under this 2018 Settlement Agreement.

68. Any notice, report, certification, data presentation or other document submitted by Richmond to Plaintiffs pursuant to this 2018 Settlement Agreement, which discusses, describes, demonstrates, or supports any finding or makes any representation concerning compliance or noncompliance with any requirement(s) of this 2018 Settlement Agreement, shall contain the following certification, signed by a responsible official:

I certify that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted and is, to the best of my knowledge and belief, true, accurate and complete.

XIX. MUTUAL RELEASE OF LIABILITY

69. Except for alleged violations of this 2018 Settlement Agreement, which shall be addressed in accordance with the Dispute Resolution in Section XVI above, and any failure to provide any ongoing payments as set forth in Paragraphs 54, in consideration of the above, upon the Effective Date of this 2018 Settlement Agreement, the Parties hereby fully release and covenant not to sue each other and their respective successors, assigns, officers, agents, attorneys, employees, representatives and all persons, firms, and corporations having an interest in them, from any and all claims and demands of any kind, nature, or description, and from any and all liabilities, relief, damages, fees (including fees of attorneys, experts, and others) alleged in the Motion or the underlying Complaint originally filed in this action, up to and including the Termination Date of this 2018 Settlement Agreement. This provision is applicable and will survive beyond the Termination Date of this Agreement.

70. Plaintiffs and Richmond acknowledge that they are familiar with section 1542 of the California Civil Code, which provides:

A general release does not extend to claims which the creditor does not know or suspect to exist in his or her favor at the time of executing the release, which if known by him or her must have materially affected his or her settlement with the debtor.

71. Plaintiffs and Richmond hereby waive and relinquish any rights or benefits they may have Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 34 of 126 1054
Settlement Agreement 29 Case No. 3:05-cv-03829 MMC
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
under California Civil Code section 1542 with respect to any other claims against each other arising from the allegations and claims as set forth or that could have been set forth in the Motion up to and including the Termination Date of this Agreement.

72. Nothing in this 2018 Settlement Agreement limits or otherwise affects Plaintiffs’ right to address or take any position Plaintiffs deem necessary or appropriate in any formal or informal proceeding before the Regional Board, EPA, or any other judicial or administrative body on any other matter relating to Richmond.

XX. COMMITMENTS OF PLAINTIFFS

73. Submission of 2018 Settlement Agreement to Federal Agencies: Plaintiffs shall submit this 2018 Settlement Agreement to the U.S. Department of Justice and U.S. Environmental Protection Agency within five (5) days of full execution of the 2018 Settlement Agreement for the 45-day agency review consistent with 40 C.F.R. § 135.5. In the event that the federal agencies comment negatively on the provisions of this 2018 Settlement Agreement, the Parties agree to meet and confer to resolve the issue(s) raised by the federal agencies.

74. Stipulated Dismissal: Within five (5) days of receiving the U.S. Department of Justice’s comments on the 2018 Settlement Agreement, or if the U.S. Department of Justice does not comment on the 2018 Settlement Agreement within the prescribed 45-day period, Plaintiffs shall file with the Court a: (1) Stipulated Request for Entry of Settlement Agreement; and (2) Notice of Dismissal of Plaintiffs’ Motion for an Order Finding Richmond in Civil Contempt of Court.

XXI. GENERAL PROVISIONS

75. Communications: In any public communications about fee increase(s) related to this 2018 Settlement Agreement, City staff shall not cite Plaintiffs or this 2018 Settlement Agreement as the sole reason for such fee increase.

76. Continuing Jurisdiction: The Court shall retain jurisdiction to enforce the terms and conditions of this 2018 Settlement Agreement and to resolve disputes arising hereunder as may be necessary or appropriate for the construction or execution of the 2018 Settlement Agreement up to and including the Termination Date.

77. Construction: The language in all parts of this 2018 Settlement Agreement shall be construed Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 35 of 126 1055
Settlement Agreement 30 Case No. 3:05-cv-03829 MMC
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
according to its plain and ordinary meaning, except as to those terms defined in the 2013 Joint Permit, the Clean Water Act, or specifically herein.

78. Choice of Law: The laws of the United States shall govern this 2018 Settlement Agreement.

79. Severability: In the event that any provision, paragraph, section, or sentence of this 2018 Settlement Agreement is held by a Court to be unenforceable, the validity of the enforceable provisions shall not be adversely affected.

80. Counterparts: This 2018 Settlement Agreement may be executed in any number of counterparts, all of which together shall constitute one original document. Telecopy, emailed, and/or facsimile copies of original signature shall be deemed to be originally executed counterparts of this 2018 Settlement Agreement.

81. Modification of the 2018 Settlement Agreement: This 2018 Settlement Agreement, and any provisions herein, may not be changed, waived, discharged, or terminated unless by a written instrument, signed by the Parties.

82. Full Settlement: This 2018 Settlement Agreement constitutes a full and final settlement of this matter.

83. Integration Clause: This is an integrated Settlement Agreement. This 2018 Settlement Agreement is intended to be a full and complete statement of the terms of the agreement between the Parties and expressly supersedes any and all prior oral or written agreements, covenants, representations, and warranties (express or implied) concerning the subject matter of this 2018 Settlement Agreement.

84. Authority: The undersigned representatives for Plaintiffs and Richmond each certify that he/she is fully authorized by the party whom he/she represents to enter into the terms and conditions of this 2018 Settlement Agreement.
///
///
///
///
///
Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 36 of 126 1056
Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 37 of 126 1057
Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 38 of 126 1058
Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 39 of 126 1059

ATTACHMENT A
Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 40 of 126 1060
Attachment A
Sewer Line Condition Grading Matrix
Preface:

The Pipeline Assessment and Certification Program (“PACP”) used by Richmond provides a mechanism for creating reliable descriptions of sewer line segment conditions. Richmond has also developed a system based on the PACP codes to assign a condition rating to sewer line segments. Requirements of the grading system were as follows:

1. The grading system should be direct and objective; and

2. Provide the ability to quantitatively measure the difference in sewer line segment between one inspection and subsequent inspections, and to prioritize among different sewer line segments.

Approach:

Using the PACP Code Matrix, each PACP defect code is assigned a condition grade from 1 to 5.

Grades are assigned based on potential for further deterioration or pipe failure. Pipe failure is defined as when the pipe can no longer convey the pipe design capacity.

Grades are assigned for two categories: (1) Structural Defects; and (2) Operating and Maintenance (“O&M”) Defects.

Grades are as follows:
5 – Immediate Attention Defects requiring immediate attention 4 - Poor Sever defects that will become Grade 5 defects within the foreseeable future
3 - Fair Moderate defects that will continue to deteriorate 2 - Good Defects that have not begun to deteriorate
1 - Excellent Minor defects
The mechanisms and rates of pipeline deterioration are highly dependent on local conditions.

However, the following general guidelines are provided to estimate the amount of time before the defect causes complete line failure.
5 – Pipe has failed or will likely fail within the next five (5) years 4 – Pipe will probably fail in five (5) to ten (10) years Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 41 of 126 1061
3 – Pipe may fail in ten (10) to twenty (20) years
2 – Pipe unlikely to fail for at least twenty (20) years 1 – Failure unlikely in the foreseeable future
Grading of Continuous Defects:

The PACP continuous defect feature is used to denote where long portions of a sewer line segment are affected by the same defect, without Richmond having to repetitively enter point defects. However, to develop a grade for the sewer line segment, a mechanism is needed to translate a continuous defect into an equivalent number of point defects. The equivalent number (i.e., quantity) of “truly” and “repeating” continuous defects is calculated by dividing the length of the continuous defect by 5. For example, a 20-foot long continuous defect, Grade 3, should equate to four (4) Grade 3 defects. Fractions are rounded to the nearest whole number.

Pipe Ratings:

The pipe rating is based on the number of occurrences for each condition grade. Ratings are calculated separately for Structural Defects and O&M Defects. Several ways of expressing sewer line segment condition are used by the PACP Condition Grading System as follows:

Segment Grade Scores – Each sewer line segment will have a Segment Grade Score for each of the five (5) grades. The number of occurrences of each pipe grade is multiplied by the pipe grade to calculate the segment grade score. For example, six (6) Grade 5 defects would be 6 times 5 and equates to a Segment Grade 5 Score of 30. If a sewer line segment had no defects of a particular grade, then the Segment Grade Score for that grade would be 0.

Overall Pipe Rating – The five (5) Segment Grade Scores are added together to calculate the Overall Pipe Rating. Structural Pipe Ratings are calculated using only Structural Defect grades, while O&M Pipe Ratings are calculated using only O&M Defect grades.

PACP Quick Rating – The PACP Quick Rating is a shorthand way of expressing the number of occurrences for the two (2) highest severity grades. The PACP Quick Rating is a four character score as follows:

1. The first character is the highest severity grade occurring along the sewer line segment length.

2. The second character is the total number of occurrences of the highest severity grade. If the total number exceeds 9, then alphabetic characters are used as follows – 10 to 14 – A; 15 to 19 – B; 20 to 24 – C; etc.

3. The third character is the next highest severity grade occurring along the sewer line segment length.

4. The fourth character is the total number of the second highest severity grade occurrences, derived as in item 2 above.

Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 42 of 126 1062
Examples:
4B27: 15 to 19 Grade 4 defects and seven Grade 2 defects were found. 3224: 2 Grade 3 defects and 4 Grade 3 defects were found.

If a sewer line segment only has defects of one grade, the first two characters are the grade and the quantity of defects, and the last two characters are 00 (denoting no other defect grades). A sewer line segment with no defects would have a Quick Score of 0000 (all zeros).

The PACP Quick Rating provides the ability to summarize the number and severity of defects found within a sewer line segment. As with the Pipe Rating, Quick Structural Ratings are calculated using only Structural Defect Grades, and Quick O&M Ratings are calculated using only O&M Defect Grades.

Pipe Ratings Index – The is an indicator of the distribution of defect severity. The Pipe Ratings Index is calculated by dividing the Pipe Rating by the number of defects. For example, the Structural Pipe Ratings Index would be the Structural Pipe Rating divided by the number of structural defects. Pipe Ratings Indexes are calculated for Structural, O&M, and Overall. A sewer line segment with a Pipe Rating of zero (0) would have Pipe Rating Index of zero (0).

Summary:

The following procedures are used to calculate sewer line segment ratings using the PACP Condition Grading System:

1. Determine the number of occurrences for each condition grade within the sewer line segment. Calculate separately for Structural Defect Grades and O&M Defect Grades.

2. Calculate the Segment Grade Score by multiplying the number of occurrences by the respective grade 1 through 5. Calculate the Structural Segment Grade Score and the O&M Segment Grade Score separately, then add together for the Overall Segment Grade Score.

3. Calculate the Pipe Rating for the pipe segment by adding the Segment Grade Scores.

Add all five (5) Structural Segment Grade Scores for the O&M Pipe Rating. Add all five (5) Overall Segment Grade Scores for the Overall Pipe Rating.

4. Determine the PACP Quick Rating by calculating the number of occurrences of the two (2) highest severity grades.

5. Calculate the Pipe Ratings Index by dividing the Pipe Rating by the number of defects. If the sewer line segment has no defects, the Pipe Rating Index is zero (0).

Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 43 of 126 1063

ATTACHMENT B
Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 44 of 126 1064
Attachment B
PACP Table
Preface:

Richmond shall use the Pipeline Assessment and Certification Program (“PACP”) Table below to assess sewer line segments in Richmond’s Collection System.

PACP Table:

Observed Defect Corrective
Action
Time Frame
(from date
defect observed)
Other Action
PACP Grade 4 or 5
Maintenance Defect
Clean sewer Schedule per Hot
Spot Cleaning
Program
Place on preventive
cleaning or root
control schedule as
appropriate, or
schedule point repair
PACP Grade 3 Maintenance
Defect
Clean sewer Schedule per Hot
Spot Cleaning
Program
Place on preventive
cleaning or root
control schedule as
appropriate, or
schedule point repair
PACP Grade 5 Structural
Defect
Repair,
rehabilitate, or
reinspect sewer
Plan and
schedule
corrective action
via the City’s
Risk Assessment
Analysis
Re-inspect within one
year if corrective not
yet taken
PACP Grade 4 Structural
Defect
Repair,
rehabilitate, or
reinspect sewer
Plan and
schedule
corrective action
via the City’s
Risk Assessment
Analysis
Re-inspect within
three years if
corrective action not
yet taken
Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 45 of 126 1065

ATTACHMENT C
Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 46 of 126 1066
Attachment C
Hot Spot Cleaning Program
Preface:

This document outlines the identification of, and management of the “Hot Spot” Cleaning Program for Richmond’s Collection System.
“Hot Spots” are defined as a specific sewer line segment, or section of sanitary sewer line that requires more frequent maintenance due to its O&M rating (i.e., amount of, severity, and frequency of buildup of grease, roots, settled deposits, mechanical or structure defect, or other materials that interferes with the normal operation of that line). By establishing a tailored, more aggressive cleaning frequency for these trouble spots, and monitoring the ongoing condition of these lines, Richmond can prevent SSOs and unwanted interruption in adequate service.

Identification and Management of Hot Spots:

Hot Spots are identified through three (3) primary mechanisms:

1. An SSO or backup;

2. Through observations and grading using the PACP Table during CCTV inspection; and !" Field observation during regular scheduled maintenance.

After a sewer line segment has been identified for more frequent cleaning and inspection through the Hot Spot Program, it will be evaluated using both the PACP grading system, intimate knowledge of the system from Field Operations, and a risk assessment to assign a cleaning frequency.

There are five (5) main levels, dependent on the O&M severity of the sewer line segment:

1. Bi-monthly (i.e., two (2) times per month);

2. Monthly;

3. Every three (3) months;

4. Every six (6) months; and

5. Every twelve (12) months.

Pipe segments receiving a PACP Maintenance Defect score of 4 or 5 will be cleaned within 30 days and placed in the Hot Spot Cleaning Program at a 6-month cleaning frequency.

Pipe segments receiving a PACP Maintenance Defect score of 3 will be cleaned within 120 days and placed in the Hot Spot Cleaning Program at a 12-month cleaning frequency.

When a sewer line segment is determined to be put on the Hot Spot list for more frequent cleaning and observation, it will remain on that list until its condition has been observed satisfactory (i.e., not in need of more frequent cleaning) during no less than three (3) consecutive inspections while on the Hot Spot Program.

Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 47 of 126 1067

ATTACHMENT D
Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 48 of 126 1068
Attachment D
Cleaning Frequency Response Matrix
Clear Light Moderate Heavy
Debris ¼ Debris Trap
Volume/500
Linear Feet
(LF) or less
1 pass
½ Debris Trap
Volume/500
LF
2 passes
¾ Debris Trap
Volume/500 LF
3 passes
1 full Debris Trap or
Greater
Operator concern for
future stoppage
4 or more passes
Grease ¼ Debris Trap
Volume/500
LF
1 pass
½ Debris Trap
Volume/500
LF
15 minutes or
less to clean
2 passes
¾ Debris Trap
Volume/500 LF
15-30 minutes to
clean
3 passes
1 full Debris Trap or
Greater
Operator concern for
future stoppage
4 or more passes
Roots ¼ Debris Trap
Volume/500
LF
1 pass
½ Debris Trap
Volume/500
LF
2 passes
¾ Debris Trap
Volume/500 LF
3 passes
1 full Debris Trap or
Greater
Operator concern for
future stoppage
4 or more passes
Debris:

Structural
sewer line
fragments,
soil, rock,
etc.

No observable
materials
Minor amount
of material
(specify type
of material if
possible)
Moderate
amount of
material (specify
type of material
if possible) per
sewer line
segment
Significant amount of
material (specify type of
material if possible) per
sewer line segment
Operator concern for
future stoppage
Action Decrease
frequency to
next lower
frequency
after three (3)
consecutive
results (e.g., 6
months to 12
months)
Continue
current
maintenance
frequency
Increase current
maintenance
frequency to
next higher
frequency (e.g.,
6 months to 3
months)
Increase current
maintenance frequency
to next higher frequency
(e.g., 6 months to 3
months)
Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 49 of 126 1069

ATTACHMENT E
Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 50 of 126 1070
Condition Assessment of
Wastewater Collection Systems

WHITE PAPER
Office of Research and Development
National Risk Management Research Laboratory - Water Supply and Water Resources Division EPA/600/R-09/049 | May 2009 | www.epa.gov/nrmrl Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 51 of 126 1071
United States
Environmental Protection
Agency
Office of Research
and Development
Washington, DC 20460
Final Report
May 2009
EPA/600/R-09/049
White Paper on
Condition Assessment of
Wastewater Collection
Systems
Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 52 of 126 1072
White Paper on
Condition Assessment of Wastewater Collection
Systems
by
Christopher S. Feeney
The Louis Berger Group, Inc.

Scott Thayer
Redzone Robotics, Inc.

Michael Bonomo
ADS Environmental Services, LLC
Kathy Martel, P.E.

The Cadmus Group
Contract No. EP-C-05-058
Task Order No. 59
Task Order Manager
Dr. Fu-hsiung (Dennis) F. Lai
Water Supply and Water Resources Division
2890 Woodbridge Avenue (MS-104)
Edison, NJ 08837
National Risk Management Research Laboratory
Office of Research and Development
U.S. Environmental Protection Agency
Cincinnati, Ohio 45268
Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 53 of 126 1073
Disclaimer
The U.S. Environmental Protection Agency, through its Office of Research and Development, funded and managed, and collaborated in the research described herein. It has been subjected to the Agency’s peer and administrative review and has been approved for publication. Any opinions expressed in this report are those of the author(s) and do not necessarily reflect the views of the Agency, therefore, no official endorsement should be inferred. Any mention of trade names or commercial products does not constitute endorsement or recommendation for use.
ii
Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 54 of 126 1074
Contents
Disclaimer ii
Contents iii
List of Figures v
List of Tables v
Symbols and Acronyms vi
Executive Summary 1

1.0 Overview of Task Order 59 1-1

1.1 Project Background 1-1

1.2 Purpose and Scope 1-1

1.3 Definition of Terms 1-2

1.4 Critical Gaps in Inspection Technologies and Condition Assessment 1-3

1.4.1 Gravity Line Inspection 1-4

1.4.2 Pressure Line/Force Main Inspection 1-4

1.4.3 Condition Assessment Protocols 1-4

1.5 Research Questions 1-4

2.0 Condition Assessment 2-6

2.1 Program Development 2-7

2.2 Asset Inspection 2-8

2.2.1 Selection of Assets for Inspection 2-8

2.2.2 Prioritization of Assets 2-9

2.2.3 Asset Inspection 2-9

2.3 Data Management 2-9

2.3.1 Condition Assessment/Asset Management Software 2-9

2.3.2 General Database Management Software 2-10

2.3.3 Spreadsheet Software 2-10

2.4 Data Analysis 2-10

2.4.1 Hydraulic Capacity/Hydraulic Restrictions 2-10

2.4.2 Structural Condition 2-11

2.5 Decision Making 2-13

3.0 Dynamics of Wastewater Collection System Failure 3-16

3.1 Failure Mechanisms 3-16

3.1.1 Hydraulic Restrictions 3-16

3.1.2 Hydraulic Capacity 3-16

3.1.3 Structural Failure 3-17

3.2 Pipe Defects 3-18

3.3 Correlations between Assessed Conditions and Performance Measures 3-19 Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 55 of 126 1075

4.0 Inspection Technologies 4-21

4.1 Camera Inspection 4-22

4.1.1 Zoom Camera Inspection 4-23

4.1.2 Digital Scanning 4-25

4.1.3 Camera Deployment 4-27

4.2 Acoustic Technologies 4-30

4.2.1 Leak Detectors 4-31

4.2.2 Acoustic Monitoring Systems 4-33

4.2.3 Sonar and Ultrasonic Testing 4-34

4.3 Electrical and Electromagnetic Methods 4-35

4.3.1 Electrical Leak Location Method 4-36

4.3.2 Eddy Current Testing and Remote Field Eddy Current Technology 4-37

4.3.3 Magnetic Flux Leakage Detection 4-40

4.4 Laser Profiling 4-41

4.5 Flow Meters 4-42

4.6 Innovative Technologies 4-43

4.6.1 Gamma-Gamma Logging 4-43

4.6.2 Ground Penetrating Radar 4-44

4.6.3 Infrared Thermography 4-44

4.6.4 Micro-Deflection 4-45

4.6.5 Impact Echo/Spectral Analysis of Surface Waves (SASW) 4-45

4.6.6 Ultrasonic Testing Systems 4-45

5.0 Technology Forum Summary 5-46

5.1 Background 5-46

5.2 General Discussion 5-46

5.3 Critical Gaps Identified in State of the Science 5-47

5.4 Recommended Next Steps 5-48

6.0 References 6-50
Appendix A A-1
Camera Technologies A-2
Acoustic Technologies A-5
Electrical and Electromagnetic Products A-7
Laser Products A-9
iv
Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 56 of 126 1076
List of Figures
Figure 2-1: Condition Assessment 2-6
Figure 5-1: Technology Forum Attendees 5-49
List of Tables
Table ES-1: Summary of Emerging and Innovative Technologies ES-4 Table 2-1: Condition Assessment Matrix 2-15
Table 3-1: Most Common Pipe Defects Identified 3-19
Table 4-1: Inspection Technology Overview 4-21
Table 4-2: Zoom Camera Inspection Summary 4-24
Table 4-3: Digital Camera Scanning Inspection Summary 4-26 Table 4-4: Pushcam Product Comparison 4-28
Table 4-5: Lateral Launcher Product Comparison 4-29
Table 4-6: Small Diameter Tractor Product Comparison 4-29 Table 4-7: Long Range Tractor Product Comparison 4-29
Table 4-8: Acoustic Technology Summary 4-31
Table 4-9: Sonar Product Comparison 4-35
Table 4-10: Electrical and Electromagnetic Methods Summary 4-36 Table 4-11: MFL Product Comparison 4-41
Table 4-12: Laser Profiling Summary 4-41
v
Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 57 of 126 1077
Symbols and Acronyms
2D Two dimensional
3D Three dimensional
A Access point
ACI American Concrete Institute
AET Acoustic emission testing
AwwaRF American Water Works Association Research Foundation (now Water Research Foundation)
B Broken
BEM Broadband electromagnetic methodology
BW Brick work
C Crack
CARE-S Computer Aided Rehabilitation Program for Sewers CCTV Closed-Circuit Television
CDMA Code Division Multiple Access
CMOM Capacity, Management, Operation and Maintenance
CWA Clean Water Act
D Deformed or deposits
DVD Digital video discs
ECT Eddy current testing
EDGE Enhanced Data Rates for Global Evolution
EPA Environmental Protection Agency
F Fracture
FELL Focused Electrode Leak Location System
FL Longitudinal fracture
FMEA Failure Mode and Effects Analysis
ft. feet
GIS Geographic Information System
gpm gallons per minute
gpm/in-mile gallons per minute per inch diameter per mile length GPR Ground penetrating radar
GPRS General Packet Radio Service
GPS Global positioning system
H Hole
HDPE high density polyethylene
HSV Hole with visible soil
I Infiltration
I/I Inflow and infiltration
in. inches
vi
Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 58 of 126 1078
IP internet protocol
IRT Infrared thermography
IS Intruding seal material
J Joint
KPI Key performance indicator
L Line
LED Light-emitting diode
LF Lining failure
M Miscellaneous
MACP Manhole Assessment Certification Program
MCU Camera underwater
MFL Magnetic flux leakage
NA Not applicable
NACWA National Association of Clean Water Agencies
NASSCO National Association of Sewer Service Companies
OB Obstacles
O&M Operations and Maintenance
ORD Office of Research and Development
PACP Pipeline Assessment Certification Program
PCCP Pre-stressed concrete cylinder pipe
PR Point repair
psi pounds per square inch
PTZ Pan-Tilt-Zoom
PVC Polyvinyl chloride
R Roots
RCP Reinforced concrete pipe
RFEC Remote field eddy current
RFEC/TC Remote field eddy current/transformer coupling
S Surface damage
SASW Spectral Analysis of Surface Waves
SCADA Supervisory Control and Data Acquisition
SCRAPS Sewer Cataloging, Retrieval, and Prioritization System Sonar Sound navigation and ranging
SSET Sewer scanning evaluation technology
SSO Sanitary sewer overflow
T Tap
TC Transformer coupling
U.S. United States of America
USEPA United States Environmental Protection Agency
VCP Vitrified clay pipe
V Vermin
vii
Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 59 of 126 1079
VR Vermin including rats
WEF Water Environment Federation
WERF Water Environment Research Federation
WF Weld failure
WRc Water Research Centre (United Kingdom)
X Collapse
viii
Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 60 of 126 1080
Executive Summary
In 2007, the United States Environmental Protection Agency (USEPA) finalized a research program entitled “Innovation and Research for Water Infrastructure for the 21st Century” that will generate the science and engineering knowledge needed to improve and evaluate innovative technologies to reduce the cost while improving the effectiveness of operation, maintenance, and replacement of aging and failing drinking water and wastewater treatment and conveyance systems (USEPA, 2007). Task Order 59, Condition Assessment of Wastewater Collection Systems, is one of several projects being conducted under this research initiative.

Overview
The objectives of Task Order 59 are to comprehensively review condition assessment technologies and to investigate condition assessment approaches for wastewater collection systems. Specific project objectives include:
x Identify and characterize the state of condition assessment technology for wastewater collection systems.
x Research and evaluate performance and cost of innovative and advanced infrastructure monitoring technologies including wireless and remote sensing approaches developed in other industries and their applicability to wastewater collection sewers. x Identify and evaluate innovative closed-circuit television (CCTV) technologies currently used by more advanced wastewater utilities for transfer to utilities at large. x Prepare protocols, metrics, and site selection criteria for field demonstration of selected innovative condition assessment technologies and decision-support systems.

This White Paper is one of the first work products created under Task Order 59 and was used as a basis for discussions at the project’s Technology Forum in September 2008. The White Paper summarizes the current state of condition assessment technologies, reviews mechanisms of pipe failure, discusses emerging and innovative technologies for sewer inspection, and presents a summary of the Technology Forum. It incorporates feedback received at the Technology Forum.

Condition Assessment
The primary components of any asset management program include the identification, location, and condition of assets. Condition assessment provides the critical information needed to assess the physical condition and functionality of a wastewater collection system, and to estimate remaining service life and asset value. After the field inspection, pipe defects are classified using a standard coding system and pipe condition is assessed using a systematic method to produce consistent, useful information. Following data analysis, condition assessment information is used to make estimates of a pipe’s remaining useful life and its long-term performance, and to make decisions about pipe rehabilitation, pipe replacement and/or further inspections.

Dynamics of Wastewater System Failure
In conducting condition assessment, it is important to understand the dynamics of pipe failure including the level, type, and severity of a failure mechanism. Failure can be a sudden, catastrophic collapse of a pipe, restricted hydraulic capacity, or a variety of other performance conditions that result in the inability of the pipe to perform as necessary for the minimum acceptable level of operation of the system. The purpose of condition assessment is to detect pipe defects which indicate the likelihood of pipe failure, as well as to assess the collection system’s performance. This section discusses the mechanisms of pipe failure, the various types of pipe defects, and the relationship between the condition of a pipe and its Page ES-1
Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 61 of 126 1081
performance. It is important to understand that the mechanisms and impacts of pipe failure are highly dependent upon the pipe material and type of sewer (i.e. force main, gravity line).

Inspection Technologies
There are a variety of technologies available for assessment of collection systems. These technologies, summarized in Table ES-1, include:
x CCTV is a well-established and common industry method used for inspecting pipes. It provides visual data on leaks, location of service laterals, and sediment and debris accumulation. The primary disadvantages to CCTV technology are that it only provides a view of the pipe surface above the waterline; it does not provide any structural data on the pipe wall integrity; and it does not provide a view of the soil envelope supporting the pipe.

For inspections of gravity lines, basic CCTV systems are not able to measure slope. There are needs for higher resolution cameras with better lighting; and improvements in crawler technology to better negotiate obstructions, grease, and off-set joints. The quality of defect identification and pipe condition assessment using CCTV is highly dependent on many factors including operator interpretation, picture quality, and flow level. Innovative camera technologies include zoom cameras, digital inspection, push cameras, and advances in crawler technology.
x Acoustic technologies use measuring devices to detect vibrations and/or sound waves. In pipeline assessment, acoustic sensors are used to detect signals emitted by defects. Three types of acoustic technologies are used for pipeline assessment: leak detectors, which are used to detect the acoustic signals emitted by pipeline leaks; acoustic monitoring systems, which are used to evaluate the condition of pre-stressed concrete cylinder pipe (PCCP) by detecting the signals emitted by breaking pre-stressed wires; and sonar, or ultrasonic systems, which emit high frequency sound waves and measure their reflection in order to detect a variety of pipe defects.
x Electrical/Electromagnetic currents are the basis of several sewer evaluation techniques.

The electrical leak location method is used to detect leaks in surcharged non-ferrous pipes.

Eddy Current Testing (ECT) and Remote Field Eddy Current (RFEC) technology identify defects in ferrous pipes. Magnetic Flux Leakage (MFL) inspection is widely used in the oil and gas industry to measure metal loss and detect cracks in ferrous pipelines. x Laser profiling uses a laser to create a line of light around the pipe wall, highlighting the shape of the sewer. This technique allows for the detection of changes to the pipe’s shape, which may be caused by deformation, corrosion, or siltation. Laser inspection can only be used to inspect the portions of a pipe wall that are above the water line. To assess the entire internal surface of a pipeline requires the pipe to be taken out of service. Lasers are often used in combination with other inspection methods, most commonly CCTV and/or sonar. x Innovative methods based on a variety of technologies are currently being developed for the evaluation of sewer collection systems. Gamma-gamma logging is a technique used primarily to evaluate cast-in-place concrete pilings and can provide information on the average bulk density of the concrete and the location of voids. Ground Penetrating Radar can detect underground voids, and is potentially useful for examination of pipe bedding and to locate leaks. Infrared Thermography involves the use of an infrared camera to measure the temperature differential across an object and is a potential method of detecting sewer defects such as leaks and voids. Micro-Deflection is a nondestructive technology used to evaluate general conditions and joint integrity of brick, concrete, and clay structures using a load to create a slight deformation or micro-deflection in the test material. Impact Echo and Spectral Analysis of Surface Waves (SASW) are acoustic wave techniques for locating and measuring cracks, delaminations, voids, and honeycombing in concrete and masonry.

Page ES-2
Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 62 of 126 1082
Summary of Technology Forum
A technology forum was held on September 11 and 12, 2008 in Edison, New Jersey to discuss the state of the science for condition assessment of wastewater collection systems and to identify critical gaps in current knowledge. A draft of the White Paper was distributed to participants in advance of the meeting and served as a basis for forum discussions. The objective of the forum was to present the findings of the research and obtain direction for additional research and further evaluation during the field demonstration tasks. The forum included discussions on data needs for conducting condition assessment and making asset management decisions; use of flow monitoring for asset management; systematic approaches to condition assessment; the importance of understanding the mechanisms of pipe failure; and tools and models available for conducting risk-based decision making related to wastewater assets.

Critical gaps in our knowledge of inspection technologies, and our ability to diagnose and predict infrastructure failures were identified at the Technology Forum and summarized below.

1. Research is needed to further define the costs and benefits of pipe inspection and rehabilitation as part of a utility’s condition assessment program. Methods of determining the impact of deteriorating collection systems on municipal budgets are needed.

2. Inspection technologies need to be identified for the following applications:
a. Reduce use of confined space entry during sewer system inspections and investigations. b. Affordable inspection technology that utilizes multi-sensor devices on a small transportable package.
c. Inspecting pipes below the waterline.
d. Inspecting force mains that are in service.
e. Inspecting laterals.

3. Data management methods and models are available, but a lack of data standardization makes it difficult to compare historical data collected with different inspection technologies that have proprietary data structures.

4. Research is needed to improve how asset condition is tracked over time. Geospatial information (with a high degree of accuracy) needs to be collected along with pipe condition data in order to link historical inspection data with an exact physical location.

Information transfer to practitioners was identified as a critical industry need. Practitioners need training on topics such as infrastructure failure mechanisms; using historical inspection data for condition assessment applications; applying the Pipeline Assessment Certification Program (PACP) coding system to characterize pipe defects; developing a condition assessment program; and preparing accurate record drawings for new and rehabilitated pipe. In addition, practitioners need simple condition assessment tools (i.e. scattergraphs for analyzing flow data, decision trees, rules of thumb).

Page ES-3
Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 63 of 126 1083
Table ES-1: Summary of Emerging and Innovative Technologies Technology
CCTV Acoustic Electrical & Electro-magnetic Lase r Innovative Technologies Conventional
Zoom camera
Digital scanning
Push-camera inspection
In-line leak detectors
Acoustic monitoring
systems
Sonar/ultrasonic
Electrical leak location
Remote field eddy current
Magnetic flux leakage
Laser profiling
Gamma-gamma logging
Ground penetrating radar
Infrared thermography
Micro-deflection
Impact echo/SASW
ApplicationPipe type G G G S G, F F G, F G, F, S G,F,S G,F,S G, F G,F,S G,F,S G,F,S G G Pipe material Any Any Any Any Any PCCP Any NF F F, PCCP Any C Any Any B B, C Pipe size >6” >6” 6”-60” 1”- 12” >4” >18” >2” >3” >2” 2”-56” > 4” Not yet defined Not yet defined Not yet defined Not yet defined >6’ Defects Detected Sediment, debris, roots Ɣ Ɣ Ɣ Ɣ Ɣ Ɣ
Pipe sags & deflections Ɣ Ɣ Partial Ɣ Ɣ Ɣ
External pits & voids Ɣ Ɣ Partial Ɣ
Corrosion & metal loss Partial Ɣ Ɣ Ɣ ƔOff-set joints Ɣ Ɣ Partial Ɣ Pipe cracks Ɣ Ɣ Ɣ Ɣ Ɣ Ɣ Ɣ Ɣ Ɣ
Leaks Ɣ Ɣ Ɣ Ɣ Ɣ Ɣ Ɣ Ɣ ƔBroken pre-stressed wires Ɣ ƔWall thickness Ɣ ƔService connections Ɣ Ɣ Ɣ ƔBedding condition Ɣ ƔBedding voids Ɣ Ɣ Ɣ Partial Deteriorated insulation Ɣ
Overall condition Ɣ
Pipe type: G – Gravity line F – Force main S – Service lateral Pipe material: NF – Nonferrous F – Ferrous B – Brick C – Concrete PCCP – Pre-stressed concrete cylinder pipe Page ES-4
Case 3:05-cv-03829-MMC Document 57 Filed 06/04/18 Page 64 of 126 1084

1.0 Overview of Task Order 59
In 2007, USEPA finalized a research program entitled “Innovation and Research for Water Infrastructure for the 21st Century” that is being implemented by the Office of Research and Development. It will generate the science and engineering knowledge needed to improve and evaluate innovative technologies to reduce the cost while improving the effectiveness of operation, maintenance, and replacement of aging and failing drinking water and wastewater treatment and conveyance systems (USEPA, 2007). Task Order 59, Condition Assessment of Wastewater Collection Systems, is one of several projects being conducted under this research initiative.

1.1 Project Background
In 2002, the USEPA Office of Water published a report entitled “Clean Water and Drinking Water Infrastructure Gap Analysis” (USEPA, 2002). The Gap Analysis report identified a critical shortfall in funding of the nation’s water and wastewater infrastructure including a $270 billion gap for wastewater infrastructure for the years 2000-2019. The deferred maintenance approach to operating and maintaining the nation’s aging wastewater infrastructure has become a paramount concern of the Agency.

Failing wastewater infrastructure can pose a significant threat to public health and the environment.

Wastewater infrastructure may include sanitary and combined sewer components, but this project is focused only on sanitary sewer systems. Systems with inadequate hydraulic capacity and/or blockages may lead to sanitary sewer overflows (SSOs) and may cause flooding damage to private property or release untreated sewage to receiving waters. Some of the health hazards associated with basement flooding by untreated wastewater include the potential presence of pathogenic microorganisms such as viruses, bacteria, and protozoa.

USEPA and State regulators have taken legal action against utility districts for property damage and SSOs. For example, in 2005, a settlement of $300 million was reached with the Washington Suburban Sanitary Commission to implement a program to reduce occurrences of basement flooding. This joint settlement was reached among the utility district, USEPA, State of Maryland, and five local citizens groups. In 2004, Knoxville Utility Board reached a settlement with the State of Tennessee for a capital improvements program of $350 million to eliminate flooding due to hydraulic restrictions. In 2004, Hamilton, Ohio reached a settlement to implement a program to eliminate SSOs and basement flooding that was estimated to cost approximately $1.5 billion.

1.2 Purpose and Scope
The objectives of Task Order 59 are to comprehensively review condition assessment technologies and to investigate condition assessment approaches for wastewater collection systems. The primary goal of the project is to develop more efficient and cost-effective means to conduct condition assessment and to use the information as part of a risk-based asset management approach to planning. Specific project objectives include:
x Identify and characterize the state of condition assessment technology for wastewater collection systems.
x Research and evaluate performance and cost of innovative and advanced infrastructure monitoring technologies including wireless and remote sensing approaches developed in other industries and their applicability to wastewater collection sewers. x Identify and evaluate innovative CCTV technologies currently used by more advanced wastewater utilities for transfer to utilities at large.