Agenda packet

Roseville City Council
March 4, 2026

Document
Agenda packet
Meeting
March 4, 2026
Body
Roseville City Council
Pages
1,714
Original file
235.0 MB
Text extracted from the city's file for reading and search. Open the original on rosevilleca.api.civicclerk.com. That file is the official record.

GC - 6:9
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024]

4. When any change to the sequence of activities, the completion date for major portions of the Work, or when changes occur which affect the critical path.

5. When Contract Amendments or a Change Order necessitates schedule revision, the Contractor shall submit a schedule analysis of all Change Order Work with its proposal.

E. Cash Flow Projection. A cash flow projection shall be submitted with the Construction Schedule. This cash flow projection shall be revised and resubmitted when revisions of the Construction Schedule will result in changes to the projected cash flow.

F. Schedules showing project completion dates earlier than specified in the Supplemental Conditions will be rejected unless justification can be provided for early completion.
6-1.05 SCHEDULE OF VALUES. Prior to preparation of the first estimate for a progress payment, the Contractor shall submit for favorable review by the Director a detailed Schedule of Values or cost breakdown of the Work under each bid item awarded. The breakdown will then become the basis for partial payment determination. Elements of Work shall be grouped by structure, pipeline, system, etc. Within each grouping, Work should be itemized by readily measurable quantities of Work complete in place. For example, concrete should be in units of cubic yards including form Work and reinforcing steel. Move-on costs, bond and insurance costs, and Overhead costs shall not be considered an item of cost for this purpose but shall be prorated over items of Work. In the event the Schedule of Values is not favorable reviewed by the Director, another Schedule of Values shall be submitted that is mutually acceptable to the Contractor and the Director. 6-1.06 CITY’S RIGHT TO STOP WORK. The Director shall have the

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1052 of 1714 ends

GC - 6:10
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] authority to order the Contractor, in writing, to suspend the Work wholly or in part, for such period as the Director may deem necessary due to the failure on the part of the Contractor to correct Work that is not in accordance with the requirements of the Contract Documents or if Contractor persistently fails to carry out Work in accordance with the Contract Documents.

The Contractor shall immediately comply with the written order of the Director to suspend the Work wholly or in part. The suspended Work shall be resumed when conditions are favorable and methods are corrected, as ordered or approved in writing by the Director.

Any stoppage of work under this section shall be at the Contractor’s sole expense, and the Contractor shall have no claim against the City based on the Contractor’s failure to perform the Work in accordance with the Contract Documents.

In addition to the City’s right to stop Work, the City may order the Contractor to submit to the City at no additional cost to the City, additional information concerning Contractor’s planned Work if the Contractor fails to promptly correct Work that is not in accordance with the requirements of the Contract Documents or persistently fails to carry out Work in accordance with the Contract Documents. The additional information ordered by the City may include, but is not limited to, preparation of Submittals or Working Drawings not otherwise required to be submitted under the Contract Documents.

In the event the City discovers that the Contractor has created an unsafe condition the City may arrange for other work forces to remedy the condition. Such remedial work shall be at the sole discretion of the City. If this action is required, the City may unilaterally terminate Work under the Contract, and will pay only for the quantities of Work actually performed, less the cost of the City’s remedial Work. In the event that Work is not halted, the Contractor must take immediate steps to correct the situation. There will be no extra payment for Work required

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1053 of 1714 ends

GC - 6:11
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] to correct unsafe conditions.

The right of the City to suspend the Work shall not give rise to a duty on the part of the City to exercise this right for the benefit of the Contractor or any other person or entity. This right shall be in addition to and not in restriction or derogation of the City’s other rights under the Contract Documents.

In the event of a suspension of Work under any of the conditions set forth in this Section 6-1.06, such suspension of Work shall not relieve the Contractor of its legal responsibilities as set forth in these General Conditions.
6-1.07 TIME OF COMPLETION. The Contractor shall complete the entire Work, including Installation, repairs, startup, troubleshooting, painting, and touchup, training, submittal or record drawings, and manuals, cleanup, demobilization, and all other Work within the number of Days set forth in the Supplemental Conditions. The time for completion includes an allowance for working time lost due to normal inclement weather.

Extensions of time may be allowed for unusual inclement weather under the provisions hereinafter described. Unusual inclement weather is weather which adversely affects “controlling” operations or the critical path of construction and which meets one of the following criteria:

A. For the particular calendar month in question, the number of individual Days with rainfall exceeding 0.10 inches exceeds the average number of such Days for that month over the immediately preceding five (5) years of record by at least three (3) Days.

B. For the particular calendar month in question, the total cumulative rainfall for that month exceeds the average cumulative rainfall for that month over the immediately preceding five (5) years of record by at least two inches (2”).

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1054 of 1714 ends

GC - 6:12
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] Rainfall shall be measured at a publicly operated, maintained, and reported station in reasonable proximity to the construction site. A claim for delay shall indicate the period of rainfall which is claimed as “unusual,” the specific dates during which the unusual rainfall and subsequent wet soil conditions prevented Work, and the specific critical path tasks adversely affected by such unusual weather. A claim for delay due to unusual inclement weather shall be filed within ten (10) Days of the apparent end of the unusual inclement rainfall period, whether or not the monthly totals are available at that time. The burden of proof that weather meets the criteria for unusual weather shall be solely the responsibility of the Contractor.

It is the responsibility of the Contractor to order materials required for the Work properly and promptly on a Notice to Proceed. If evidence presented demonstrates that, in spite of the Contractor's efforts, government-established priorities controls delay material deliveries, suitable extension of time will be made.

If performance of extra Work ordered by the City or failure of the City to provide the necessary site for Installation affects construction tasks which are “controlling” or which are on the “critical path” of the Construction Schedule, suitable extensions of time will be made.

The Contractor shall not be entitled to a time extension for delays in activities on non-critical paths of the favorably reviewed schedule unless the duration of the excusable delay exceeds the total float of the activities being delayed. If the duration of an excusable delay does exceed the total float of the activities affected by the delay, the Contractor shall be entitled to an extension equal to the difference.

C. Determination that a day is a non-working day by reason of inclement weather or conditions resulting immediately therefrom, shall be made by the Director. 6-1.08 LIQUIDATED DAMAGES. It is agreed by the parties to the Contract

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1055 of 1714 ends

GC - 6:13
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] that in case all the Work called for under the Contract in all parts and requirements is not completed within the number of Days as set forth in the Supplemental Conditions, damage will be sustained by the City and that it is and will be impracticable and extremely difficult to ascertain and determine the actual damage which the City will sustain in the event of and by reason of such delay; and it is therefore agreed that the Contractor will pay to the City, the monetary amount indicated in the Supplemental Conditions in dollars (U.S.) per day for each and every calendar day of delay in completing the Work in excess of the number of Days prescribed and the number of additional calendar days, if any, authorized by Contract Change Order; and the Contractor agrees to pay said Liquidated Damages herein provided for, and further agrees that the City may deduct the amount thereof from any moneys due or that may become due the Contractor under the Contract.

It is further agreed that in case the Work is not finished and completed in all parts and requirements within the number of Days specified, the City shall have the right to increase the number of Days or not, as it may deem best to serve the interest of the City, and if it decides to increase the said number of Days, it shall further have the right to charge to the Contractor, its heirs, assigns or sureties and to deduct from the final payment for the Work all of any part, as it may deem proper, of the actual cost of engineering, inspection, superintendence, and other Overhead expenses which are directly chargeable to the Contract, and which accrue during the period of such extension, except that cost of preparation of final statement shall not be included in such charges.
6-1.09 DELAYS AND EXTENSIONS TO THE WORK. The Contractor must complete all Work within the time specified in the Agreement. The Contractor will be granted an extension of time and will not be assessed with liquidated damages or the cost of engineering

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1056 of 1714 ends

GC - 6:14
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] and inspection for any delay in substantially completing the Work (or parts thereof) beyond the time set forth in the Agreement, provided that such delay was caused by unforeseeable causes beyond the control and without the fault or negligence of the Contractor. Examples of such causes include acts of public enemy, fire, floods, abnormal weather (as described below), earthquakes, epidemics, quarantine restrictions, strikes, labor disputes and freight embargoes, fire, changes made pursuant to the provisions of “Changes in the Work” under Section 3 of these General Conditions or acts or neglect of the City not contemplated by the Contract Documents.

In all cases, any extension of time is conditioned on the following:

1. That the cause is not due to the fault or negligence of the Contractor, and the Contractor has taken reasonable precautions to prevent and minimize the effects thereof; and

2. That the Contractor notifies the Director in writing within three (3) Days from the beginning of such delay specifying the nature of the delay and the measures that have been or will be taken to prevent or minimize the delay. Failure to submit written notice within this time period shall constitute an absolute waiver of any claim for a time extension.

No extension of time will be granted for a delay caused by a shortage of materials, unless the Contractor furnishes to the City documentary proof that it has diligently made every effort to obtain such materials from all known sources within reasonable reach of the work and further proof, as acceptable to the Director, that the inability to obtain such materials when originally planned did in fact cause a delay in Final Completion of the entire Work which could not be compensated for by revising the sequence of the Contractor’s operations. Only the physical shortage of material will be considered as a cause for extension of time, and no consideration

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1057 of 1714 ends

GC - 6:15
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] will be given to any claim that material could not be obtained at a reasonable, practical or economical cost or price, unless it is shown to the satisfaction of the City that such material could have been obtained only at exorbitant prices entirely out of line with current rates, taking into account the quantities involved and the usual practices in obtaining such quantities.

No extension of time will be granted for a delay caused by Contractor’s staff turnovers, understaffing or insufficient quantity of qualified staff able to perform the necessary work.

The term “shortage of materials,” as used in this section, shall apply only to materials, articles, parts or equipment which are standard items and shall not apply to materials, parts, articles or equipment which are processed, made, constructed, fabricated or manufactured to meet the specific requirements of the Contract Documents.

No extensions of time will be granted for delays that have no measureable impact on the completion of the Work (or parts thereof) under the Contract Documents. When extensions of time are granted, they will be limited to the period equivalent to the actual number of Days lost on the critical path or controlling operations of the Construction Schedule, taking into account the extent to which that delay could be decreased by reasonable mitigation measures by the Contractor. All requests for extensions of time must be supported with a critical path analysis showing the critical path and impacts to it. Contractor’s failure to submit this analysis will be sufficient cause for denial of any request for a time extension.

Within a reasonable period of time after the Contractor submits the notice and information required by this section, the City will determine whether an extension of time is justified and, if so, the number of days for the extension.

Abnormal weather may be a valid basis for a time extension under the Agreement. “Abnormal Weather” occurs when the number of days of rain above 0.5 inches in a 24 hour

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1058 of 1714 ends

GC - 6:16
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] period exceeds the average for such rainfall in a particular month as determined by the National Weather Service. The Contractor will only be entitled to, at most, a time extension for the number of days of rain exceeding the average for that month in the locale where the Work is to be performed. If delays are caused by the Contractor or those for whom the Contractor is responsible, the Contractor will only be entitled to, at most, a time extension for the number of rain days exceeding the average for the month when the Work should have been performed.

In addition, before a time extension may be granted for abnormal weather, the Contractor must establish that the rain either significantly impacted at least sixty percent (60%) of the planned work of the controlling operations for a particular day or prohibited at least five (5) hours of work on the controlling operations planned for that day. Contractor shall employ reasonably methods to mitigate the impact of abnormal weather (i.e., dewatering, protection of site, etc.) The occurrence of rain during non-work hours or having minimal impact to work on the controlling operation shall not constitute a day of abnormal weather.

In the event that the project experiences favorable weather for a particular month (e.g., the number of actual rain days in a month less than that indicated above for allowable rain days per months), the additional float resulting from such favorable weather shall accrue to the project.

Any Contractor claim for damages or additional compensation based on delay shall be limited to only those circumstances where the Contractor has fulfilled each of the following three (3) requirements:

1. Contractor has established its entitlement to a time extension pursuant to the provisions described above regarding delay and extensions to the Work.

2. The delay was caused solely by the City’s issuance of changes made pursuant to the

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1059 of 1714 ends

GC - 6:17
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] provisions of “Changes in the Work” under Section 3 of these General Conditions or by acts or neglect of the City.

3. The delay was unreasonable under the circumstances and not within the contemplation of the parties.

It is expressly understood and agreed that delays caused by the City will be noncompensable when there are concurrent delays caused by the Contractor. Also, the Contractor shall have no entitlement to additional compensation for any delay where there have been concurrent delays caused by non-compensable delays, including, but not limited to, fire, floods, earthquakes, epidemics, quarantine restrictions, strikes, labor disputes, and freight embargoes.

Contractor’s damages and/or additional compensation for delays will consist solely of the extended costs of maintaining the Contractor’s Work Site presence. The Contractor will not be entitled to any extended home office overhead.

Compensation for idle time of equipment will be determined in the same manner as determinations are made for equipment used in the performance of extra work paid for on a Force Account basis with the following exceptions:

1. The time for which compensation will be paid will be the actual normal working hours during which such delay conditions exists, but in no case will exceed eight (8) hours in any one day.

2. The days for which compensation will be paid will be each calendar day of the work week (defined elsewhere in the Contract Documents) and Legal Holidays, during the existence of such delay, except that when rental of the equipment is paid for under the provisions in Section 3-1.06C, “Force Account Payment – Equipment,” of these General Conditions, no payment will be made for delays in accordance with the

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1060 of 1714 ends

GC - 6:18
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] provisions of this section.

Actual loss shall be understood to include no items of expense other than idle time of personnel, cost of extra moving of equipment, and cost of longer hauls. Compensation for idle time of equipment will be determined as provided in this section and compensation for idle time of personnel will be determined pursuant to Section 3-1.06A, “Force Account Payment – Labor,” of these General Conditions. No markup will be added in either case for Overhead and profit.

The cost of extra moving of equipment and the cost of longer hauls will be paid for as extra work as provided pursuant to “Changes to the Work” elsewhere in the Contract Documents. 6-1.10 TERMINATION.
6-1.10A TERMINATION OF AGREEMENT – CONVENIENCE OF
CITY. The Department reserves the right to terminate the Contract at any time and for any reason if the Director determines that to do so would be in the best interest of the City. Any termination which is not based on the circumstances set forth in Section 6.1-10B below shall be effected by delivery to the Contractor of a Notice of Termination specifying the extent to which performance of Work under the Contract is terminated, and the date upon which such termination becomes effective.

Upon the Contractor’s receipt of a written Notice of Termination for convenience, the Contractor shall cease Work as to those portions of the project so terminated and shall undertake the steps outlined in Section 6-1.10B below.

1. Acceptance of the Contract as hereinafter specified shall not relieve the Contractor of responsibility for damage to materials except as follows:
a. The Contractor's responsibility for damage to materials for which partial payment has been made as provided in Section 7-1.07, “Progress

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1061 of 1714 ends

GC - 6:19
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] Payments,” of these General Conditions and for materials furnished by the City for use in the Work and unused shall terminate when the Director certifies that such materials have been stored in the manner and at the locations he or she has directed.
b. The Contractor's responsibility for damage to materials purchased by the City subsequent to the issuance of the notice that the Contract is to be terminated shall terminate when title and delivery of such materials has been taken by the City.
c. When the Director determines that the Contractor has completed the Work under the Contract directed to be completed prior to termination and such other Work as may have been ordered to secure the project for termination, the Contractor will recommend that the City formally accept the Work, and immediately upon and after such Acceptance by the City, the Contractor will not be required to perform any further Work thereon and shall be relieved of its contractual responsibilities for injury to persons or damage to property which occurs after the formal Acceptance of the project by the City.

2. The total compensation to be paid to the Contractor shall be determined by the Director on the basis of the following:
a. The reasonable cost to the Contractor, without profit, for all Work performed under the Contract, including mobilization, demobilization and Work done to secure the project for termination. Reasonable cost will include a reasonable allowance for project Overhead and general

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1062 of 1714 ends

GC - 6:20
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] administrative Overhead not to exceed a total of seven percent (7%) of Direct Costs of such Work.
b. A reasonable allowance for profit on the cost of the Work performed as determined under subsection (a), provided the Contractor establishes to the satisfaction of the Director that it is reasonably probable that it would have made a profit had the Contract be completed and provided further, that the profit allowed shall in no event exceed four percent (4%) of said cost. c. The reasonable cost to the Contractor of handling material returned to the vendor, delivered to the Department or otherwise disposed of as directed by the Director.
d. A reasonable allowance for the Contractor's administrative costs in determining the amount payable due to termination of the Contract.

All records of the Contractor and the Contractor's Subcontractors, necessary to determine compensation in accordance with this Section, shall be open to inspection or audit by representatives of the Department at all times after issuance of the notice that the Contract is to be terminated and for a period of three (3) years, and such records shall be retained for that period.

After Acceptance of the Work by the Director, the Director may make payments on the basis of interim estimates pending issuance of the Final Statement, when in his or her opinion the amount thus paid, together with all amounts previously paid or allowed, will not result in total compensation in excess of that to which the Contractor will be entitled. All payments, including payment upon the Final Statement, shall be subject to deduction for prior payments and amounts, if any, to be kept or retained under the provisions of the Contract.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1063 of 1714 ends

GC - 6:21
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] In the event that the City terminates this Contract under Section 6-1.10B below and it is determined for any reason that there was not sufficient cause to do so, the City’s termination automatically will convert to a termination for convenience under this section and the terms and conditions outlined in this section automatically will be applied to effectuate the Contract termination. Thus, damages to which a Contractor may be entitled as a result of an improper default termination will be limited to the amounts provided for in this section.

The provisions of this section shall be included in all subcontracts. 6-1.10B TERMINATION OF AGREEMENT - FOR CAUSE. An
“Event of Default” as referred to in this section shall occur if the Contractor:

1. Fails to maintain progress of the Work in accordance with the requirements of the Contract Documents; or

2. Fails to prosecute the Work or any of its components in accordance with the Contract Documents; or

3. Persistently or repeatedly fails or refuses to supply sufficient properly skilled workers or proper material to permit the performance of the Work in accordance with the Contract Documents; or

4. Fails to make prompt payment to Subcontractors or Suppliers in accordance with the respective agreements between the Contractor and the Subcontractor and Contractor and Supplier; or

5. Fails to comply with applicable laws, ordinances or rules, regulations or orders of a public authority having jurisdiction over the Work; or

6. Abandons, assigns or sublets the Contract without approval of the City; or

7. Becomes bankrupt or is subject to appointment of a receiver on behalf of the

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1064 of 1714 ends

GC - 6:22
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] Contractor; or

8. Otherwise is guilty of a substantial breach of a provision of the Contract Documents.

Upon the City’s reasonable belief that there has been an Event of Default by the Contractor, the City may elect to give the Contractor written notice thereof. The Contractor thereafter shall cure the default as soon as possible and in no event after ten (10) Days from the Contractor’s receipt of the City’s written notice.

If the Contractor does not timely cure its default, the City may, without waiver of any of its other rights and remedies, elect to terminate the Contract, or portion thereof.

Upon the City’s election to terminate the Contract, or portion thereof, the City shall have the right to complete the Work, or portion involved, by whatever means and methods it deems expedient, including the hiring of others on such terms as the City deems advisable. The City shall have the right to take possession of the Contractor’s materials, plant, tools, equipment and property of any kind provided by or on behalf of the Contractor for the purpose of the Work, or a portion of them, without being responsible to the Contractor for wear and tear. The Contractor shall have no rights in such property during its use by the City. The City shall not be required to obtain the lowest prices for completing the Work or a portion of it but shall make such expenditures as, in the City’s sole judgment, best accomplish such completion.

The expense of completing such Work or portion thereof, together with a reasonable charge for engineering, managerial and administrative services, as certified by the City, shall be charged to the Contractor, and the expense so charged shall be deducted by the City out of such monies as may be due or may at any time thereafter become due to the Contractor. In case such expense is more than the sum which otherwise would have been payable to the Contractor under the Agreement, then the Contractor or its surety or sureties shall promptly pay the amount of

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1065 of 1714 ends

GC - 6:23
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] such excess so due. When the City terminates the Contract under this section, the Contractor shall not be entitled to receive any further payments until the Work is completed and there has been a final settlement of costs of completing the Work covered by such notice of default.

The City will issue to the Contractor a written notice specifying that the Contract, or portion thereof, is terminated. Upon receipt of said written notice and, except as otherwise directed in writing by the City, the Contractor shall:

1. Stop all Work under the Contract; or if partial termination, stop Work relating to the terminated portion of the Agreement;

2. Perform Work the City deems necessary to secure the Work Site for termination including measures to leave the Work Site in a safe condition;

3. Remove equipment from the site of Work, as specified by the City;

4. Take such action as is reasonably necessary to protect materials from damage;

5. Notify all Subcontractors and Suppliers that the Contract or portion thereof is being terminated and that their contracts or orders are not to be further performed unless otherwise authorized in writing by the City;

6. Provide the City with an inventory list of all materials previously produced, purchased or ordered from Suppliers for use in the Work and not yet used in the Work, including its storage location, and such other information as the City may request;

7. Dispose of materials not used in the Work as directed by the Director. It shall be the Contractor’s responsibility to provide the City (a) with good title to all materials purchased by the City hereunder, including materials for which partial payment has been made by the City and (b) with bills of sale or other documents of title for such

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1066 of 1714 ends

GC - 6:24
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] materials;

8. Subject to the prior written approval of the City, settle all outstanding liabilities and all claims arising out of Subcontractors or orders for materials terminated hereunder.

To the extent directed by the City, the Contractor shall assign to the City all rights, title and interests of the Contractor under subcontracts or orders for materials terminated hereunder. The City shall be at liberty to negotiate with and engage any Subcontractors who had contracted with the Contractor for the Work;

9. Furnish the City with the documentation required to be furnished by the Contractor under the provisions of the Contract Documents, including, on projects as to which Federal funds are involved, all documentation required under the Federal requirements included in the Agreement; and

10. Take such other actions as the City may direct.

If only a portion of the Work has been terminated, the Contractor shall perform the remainder of the Work in conformity with the Contract Documents and in such a manner as not to interfere with the City or others in their performance and completion of the portion of the Work which was terminated.

The City may recover from the Contractor the amount of any loss or damage, including consequential damages, suffered or incurred as a result of the Contractor’s default.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1067 of 1714 ends

GC - 7:1
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] SECTION 7

ACCEPTANCE AND PAYMENT
7-1.01 ACCEPTANCE. When the Contractor believes that the entire Work is fully and finally completed, including the satisfactory completion of inspections, tests, and documentation specified in the Contract Documents and completion of all punch list and cleanup items, the Contractor shall submit to the City a written request for final Acceptance within fifteen (15) Days thereafter, specifying that the Work is fully and finally completed and the date on which it was completed. Within thirty (30) Days after receipt of the request for final Acceptance, the City will inspect the Work and will either:

1. Reject the request for final Acceptance, specifying the defective and/or uncompleted portions of the Work; or

2. Notify the Contractor that the Work will be accepted by Resolution of the City Council of the City of Roseville, and a Notice of Completion will be caused to be recorded by the City Clerk; or

3. Notify the Contractor that the Work has been accepted by the City but no Notice of Completion will be recorded.

If the City rejects the request for final Acceptance, the Contractor shall promptly remedy the defective and/or uncompleted portions of the Work. Thereafter, the Contractor shall again submit a written request for final Acceptance of the Work, specifying a new date based on the date the defective and/or uncompleted portions of the Work were corrected. Thereafter, the foregoing procedure shall apply successively until the City has verified that the Work is fully and finally completed and accepted the Work by Resolution of the City Council or by written

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1068 of 1714 ends

GC - 7:2
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] notification from the Director. Immediately upon such Acceptance, the Contractor shall be relieved of the duty of maintaining the Work as a whole.

All warranties commence upon final Acceptance of the Work. The City’s final Acceptance of the Work shall not be construed as an acceptance by the City of any latent defects discovered with regard to the Contractor’s work. Furthermore, Contractor’s obligations under Section 5-1.22 “Responsibility for Damage and Indemnification” shall still remain applicable after the City’s grant of final Acceptance of the Work.

Prior to final Acceptance, the Contractor shall submit to the City the Record Documents and Operation and Maintenance Manuals as specified in the Contract Documents. 7-1.02 SCOPE OF PAYMENT. The Contractor shall accept the compensation provided in the Contract as full payment for furnishing all labor, materials, tools, equipment, and incidentals necessary to the completed Work and for performing all Work contemplated and embraced under the Contract; also for loss or damage arising from the nature of the Work, or from the action of the elements, or from any unforeseen difficulties which may be encountered during the prosecution of the Work until the Acceptance by the Director and for all risks of every description connected with the prosecution of the Work, also for all expenses incurred in consequence of the suspension or discontinuance of the Work as provided in the Contract; and for completing the Work according to the Contract. Neither the payment of any estimate nor of any retained percentage shall relieve the Contractor of any obligation to make good any defective Work or material.

No compensation will be made in any case for loss of anticipated profits. 7-1.03 NOTICE OF POTENTIAL CLAIM. The Contractor shall not be entitled to the payment of any additional compensation for any act or failure to act by the City,

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1069 of 1714 ends

GC - 7:3
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] including failure or refusal to issue a Change Order, or for the happening of any event, thing, occurrence or other cause unless the Contractor has given the City due written Notice of Potential Claim as hereinafter specified, provided, however, that compliance with this Section 7-

1.03 shall not be a prerequisite as to matters within the scope of the notice provisions in Section 6-1.07, “Time of Completion,” or the notice provisions in Section 6-1.08, “Liquidated Damages,” of these General Conditions, nor to any claim which is based on differences in measurement or errors of computation as to correct quantities.

The written Notice of Potential Claim shall set forth the reasons for which the Contractor believes additional compensation will or may be due, the nature of the costs involved, and, insofar as possible, the amount of the potential claim. The said Notice as above required must have been given to the Director prior to the time that the Contractor shall have performed the Work giving rise to the potential claim for additional compensation, if based on an act or failure to act by the Director, or in all other cases within seven (7) Days after the happening of the event, thing, occurrence or other cause giving rise to the potential claim.

If the Notice of Potential Claim does not include complete information about the claim or the parties do not execute a Contract Change Order in connection with the Notice of Potential Claim, Contractor shall submit complete information about its claim for additional compensation and/or extension of time for performance within fifteen (15) Days after such work is performed.

Failure to provide written notice of claim prior to undertaking such work or failure to timely submit a complete and specific information about the claim for additional compensation and/or extension of the time for performance shall be deemed a waiver and abandonment of such claim.

If there is a dispute over any claim, the Contractor shall continue to Work during the dispute resolution process in a diligent and timely manner as directed by the City, and shall be

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1070 of 1714 ends

GC - 7:4
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] governed by all applicable provision of the Agreement.

The Contractor shall maintain cost records of all Work that is the basis of any dispute.

On a daily basis, Contractor shall submit to City completed daily forms, the format of which will be acceptable to the City, with respect to the Contractor’s costs of performing the disputed work.

These daily forms shall itemize all of Contractor’s costs in performing the disputed work, including, but not limited to, all costs relating to materials, labor and equipment with respect to the disputed work. These daily forms shall provide names or identification and classification of affected workers, the hourly rate of pay and hours worked, and also the size, type, and identification number of equipment and hours operated. Said daily work forms shall be duly signed and verified by the Contractor or its authorized representative. The City’s receipt of the Contractors’ daily forms shall not constitute an approval of the Contractor’s claim. Contractor’s failure to submit the daily forms on a daily basis shall constitute a waiver of the Contractor’s right to claim any additional compensation for the disputed work.

Each Contractor claim shall include full and complete information concerning the Claim.

Contractor shall provide a clear, concise recital of the basis, upon which the claim is asserted, including a designation of the provisions of the Contract Documents upon which the claim is based. Contractor shall also include a statement as to the amount of time and/or compensation sought pursuant to the claim; if Contractor’s claim arises from an ongoing occurrence, Contractor shall so state in its claim, including a description of the specific Work activities affected by the claim. All costs, expenses or damages and extensions of time claimed shall be described in reasonable detail under the circumstances together with complete supporting documentation.

The City will review any timely Notice of Potential Claim and supporting information

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1071 of 1714 ends

GC - 7:5
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] submitted by Contractor. In conducting this review, the City shall have the right to require the Contractor to submit such additional or supporting documents, data and other information as the City may require.

If an agreement can be reached which resolves the Contractor’s claim, the parties will execute a Contract Change Order to document the resolution of the claim. If the parties cannot reach agreement with respect to the Contractor’s claim, the Contractor shall still be obligated to comply with the claim identification provisions identified in these General Conditions, including but not limited to Section 7-1.04.

It is the intention of this Section 7-1.03 that differences between the parties arising under and by virtue of the Contract be brought to the attention of the Director at the earliest possible time in order that such matters may be settled, if possible, or other appropriate action promptly taken. The Contractor hereby agrees that it shall have no right to additional compensation for any Claim that may be based on any such act, failure to act, event, thing or occurrence for which no timely written Notice of Potential Claim as herein required was filed. 7-1.04 CLAIMS. Contractor must submit all Claims, for which it has previously submitted a Notice of Potential Claim, prior to Acceptance of the Work. Each such Claim must be sent to the City by registered mail or certified mail with return receipt requested and must contain reasonable documentation to support the Claim.

Upon receipt of a Claim, the City shall conduct a reasonable review of the Claim and, within a period not to exceed forty-five (45) Days, or such further time as mutually agreed upon or necessary pursuant to Public Contract Code Section 9204, the City shall provide the Contractor a written statement identifying what portion of the Claim is disputed and what portion is undisputed. If the City does not respond to a Claim from the Contractor within the time

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1072 of 1714 ends

GC - 7:6
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] specified herein, such Claim shall be deemed rejected in its entirety.

Any payment due on an undisputed portion of the Claim shall be processed and made within sixty (60) Days after the City issues its written statement.

If the Contractor disputes the City’s written response, or if the City does not respond within the time specified herein, the Contractor may demand in writing an informal conference to meet and confer for settlement of the issues in dispute. Upon receipt of a demand in writing sent by registered mail or certified mail, return receipt requested, the City shall schedule a meet and confer conference within thirty (30) Days for settlement of the dispute.

Within ten (10) business days following the conclusion of the meet and confer conference, if the claim or any portion of the claim remains in dispute, the City shall provide the Contractor a written statement identifying the portion of the Claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the Claim shall be processed and made within sixty (60) Days after the City issues its written statement. Any disputed portion of the Claim, as identified by the Contractor in writing, shall be submitted to nonbinding mediation, with the City and the Contractor sharing the associated costs equally. The City and the Contractor shall mutually agree to a mediator within ten (10) business days after the disputed portion of the Claim has been identified in writing. If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the Claim. Each party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator. If mediation is unsuccessful, the parts of the Claim remaining in dispute shall be resolved in accordance with Section 7-1.05 below.
7-1.05 DISPUTE RESOLUTION PROCEDURE. All Claims not resolved

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1073 of 1714 ends

GC - 7:7
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] pursuant to Section 7-1.04, shall be resolved pursuant to Public Contract Code Section 10240, et seq.
7-1.06 STOP PAYMENT NOTICES. The City, by and through the Department or other appropriate office or officers, may at its option and at any time retain out of any amounts due the Contractor, sums sufficient to cover claims, filed pursuant to Civil Code Section 9350, et seq., including an amount to provide for the reasonable cost of any litigation thereunder. 7-1.07 PROGRESS PAYMENTS. Within fifteen (15) Days after the effective date in the Notice to Proceed, but in any event prior to Contractor’s first Application for Payment, the Contractor shall submit to the City a detailed Schedule of Values.

Upon its approval, the Schedule of Values will form a basis for determining the compensation payable to the Contractor based on its actual progress of Work with respect to each Lump Sum bid item. The City, prior to any progress payment being made, must approve the Schedule of Values.

At the Director’s discretion the approved Schedule of Values may be used as the basis for calculating the adjustment in compensation for a lump sum bid item due to changes ordered by the Director. When an ordered change increases or decreases the quantities shown in an approved Schedule of Values, at the Director’s discretion, the adjustment in compensation may be determined in the same manner specified for increases and decreases in the quantity of a bid item of work in accordance with Section 3-1.05(B), “Contract Price Adjustment,” of these General Conditions.

The Contractor once in each month shall submit an Application for Payment, for approval by the Director. Contractor’s Applications shall be based on the Schedule of Values submitted to the City. These applications shall be supported by: (1) documentation requested by the City to

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1074 of 1714 ends

GC - 7:8
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] substantiate the payment request; (2) statutory releases from Contractor and all Subcontractors and suppliers pursuant to Civil Code Sections 8132 and 8138; and (3) certified payroll records for the period for which payment is requested. Specifically, the Contractor will submit conditional waivers upon progress payment executed by all contractors and suppliers that will be receiving sums sought in the instant payment request and also submit unconditional waivers upon progress payment executed by all contractors and suppliers that have been paid to the date of the payment request. The Contractor shall certify that the Work for which payment is requested has been accomplished. When requested by the City, the Contractor shall submit receipts, invoices and other documentation that the City requires to be furnished for purpose of evaluating the application.

The City will pay the Contractor within thirty (30) Days after its receipt of an undisputed and properly submitted Application for Payment, after deducting all previous payments, retention, and other sums as described in the Contract Documents. Within seven (7) Days of its receipt of the Contractor’s Application for Payment, the City will determine whether it complies with the provisions of the Contract Documents. As appropriate, the City will return the application to the Contractor accompanied by a document prepared by the City setting forth the reasons for the rejection. Thereafter, the Contractor shall correct and resubmit the Application for Payment. Progress payments may be withheld for Work that is not performed in accordance with the Contract Documents.

The City may deduct the following from each progress payment:

1. An amount equal to one hundred and twenty-five percent (125%) of the amount claimed under any stop payment notice or other lien filed against the Contractor, which includes an amount to provide for the reasonable cost of any litigation

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1075 of 1714 ends

GC - 7:9
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] thereunder.

2. Any Liquidated Damages or Assessments that have accrued as of the date of the Application for Payment.

3. Any sums expended by the City in performing any of the Contractor’s obligations under the Agreement that the Contractor has failed to perform.

4. Any other sums that the City is entitled to recover from the Contractor under the terms of the Contract including damages to the City’s property.

5. The failure of the City to deduct any of the above identified sums from a progress payment shall not constitute a waiver of the City’s right to such sums.

No such estimate or payment shall be construed to be an acceptance of any defective Work or improper materials.

Under no circumstances will the City make payment to unlicensed Contractors. As a condition of payment, the Contractor is required to maintain the applicable Contractor’s license as identified in the Notice to Contractors for the duration of the Work. 7-1.08 PAYMENT FOR MATERIALS AND EQUIPMENT ON HAND.

Partial payments may be made to the extent of seventy-five percent (75%) of the cost of materials and equipment plus delivery to be incorporated in the Work, provided that such materials and equipment meet the requirements of the Contract Documents and are delivered to acceptable sites on the plant site or at other sites in the vicinity that are acceptable to the City and only with the prior written approval by the City. Such delivered costs of stored or stockpiled materials and equipment may be included in the next progress payment after the following conditions are met:

A. Equipment and materials will only be eligible if given conditional or final

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1076 of 1714 ends

GC - 7:10
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] Acceptance by the Director and are in apparent compliance with favorably reviewed Submittals.

B. Only equipment or materials which have received favorable review of Shop Drawings will qualify.

C. The material or equipment has been stored or stockpiled adequately protected against damage in a manner acceptable to the Director at an approved site.

D. The Contractor has furnished the Director with acceptable evidence of the quantity and the quality of such stored or stockpiled materials or equipment with identification of where they will be incorporated into the project with Specification reference.

E. The Contractor has furnished the Director with satisfactory evidence that the material or equipment and transportation costs have been paid.

F. The Contractor has furnished the City legal title (free of liens or encumbrances of any kind) and lien releases to the material or equipment so stored or stockpiled.

G. The Contractor has furnished the City evidence that the material or equipment so stored or stockpiled is insured against loss by damage to or disappearance of such materials at any time prior to use in the Work.

It is understood and agreed that the transfer of title and the City payment for such stored or stockpiled materials or equipment shall in no way relieve the Contractor of its responsibility for furnishing and placing such materials or equipment in accordance with the requirements of the Contract Documents.

In no case will the amount of progress payments for materials or equipment on hand exceed the Contract Price for such materials or equipment or the Contract Price for the Contract item in which the material is intended to be used.

No partial payment will be made for stored or stockpiled living or perishable plant

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1077 of 1714 ends

GC - 7:11
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] materials.

The Contractor shall bear all costs associated with the progress payment of stored or stockpiled materials or equipment in accordance with the provisions of this Section. 7-1.09 RETENTION ON PROGRESS PAYMENTS. From each progress payment estimate, five percent (5%) will be deducted and held in retention by the City. The remainder, less any deductions described in Section 7-1.07, “Progress Payments,” of these General Conditions, will be paid to the Contractor as progress payments.

Pursuant to Public Contract Code Section 22300, the successful Bidder may submit Securities in lieu of retention payments by the City. Upon the Contractor’s request, the City will make payment of funds withheld from progress payments, pursuant to the requirements of California Public Contract Code Section 22300, if the Contractor deposits in escrow with the City or with a bank acceptable to the City, securities eligible for investment under California Government Code Section 16430, bank or savings and loan certificates of deposit, interest bearing demand deposit accounts, standby letters of credit, or any other security mutually agreed to by the Contractor and the City, upon the following conditions:

1. The Contractor shall bear the expenses of the City and the escrow agent in connection with the escrow deposit made.

2. Securities or certificates of deposit to be placed in escrow shall be of a value at least equivalent to the amounts of retention to be paid to the Contractor pursuant to this section.

3. Contractor shall enter into an escrow agreement satisfactory to the City, which agreement shall be substantially similar to the form provided in California Public Contract Code section 22300.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1078 of 1714 ends

GC - 7:12
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024]

4. The Contractor shall obtain the written consent of the surety to such agreement.
7-1.10 FINAL PAYMENT. Final payment will be made only after Contractor has achieved Final Completion of the Work pursuant to the provisions of Section 7-1.01, “Acceptance,” of these General Conditions. Before final payment can be made, the Contractor shall have furnished the City with the following:

1. All Record Documents, catalogues, instruction sheets and information as required by the Contract Documents.

2. Conditional Waivers and Releases Upon Final Payment executed by Contractor and all Subcontractors and Suppliers, as provided by Civil Code Section 8136. Unconditional Waivers and Releases Upon Final Payment, as provided in Civil Code Section 8138, executed by Contractor and all Subcontractors and Suppliers, must be provided for all Subcontractors and Suppliers that have been paid in full.

Within thirty (30) Days of the date of the City’s Acceptance of the Work, the Contractor shall prepare and submit a Final Invoice, showing the proposed total amount due the Contractor, segregated by Bid item quantities, Change Order Work, and other basis for payments; deductions made or to be made for prior payment; and amounts previously retained. Prior invoices and payments shall be subject to correction in the proposed Invoice for Final Payment. Payments to the Contractor will be made only for actual quantities of the Contract items of work constructed in accordance with the Contract Documents.

The City will review the Contractor’s proposed Final Invoice and necessary changes or corrections will be forwarded to the Contractor. Within ten (10) Days thereafter, the Contractor

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1079 of 1714 ends

GC - 7:13
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] shall submit a revised proposed Final Invoice incorporating changes or corrections made by the City together with any new claims resulting therefrom. Upon approval by the City, the corrected proposed Final Invoice will become the approval Final Invoice.

If agreements are reached on all questions regarding the Final Invoice, the City will pay the entire sum found due on the approved application. However, the City will withhold sums sufficient to pay all unsettled claims for which stop payment notices have been filed pursuant to Section 9350, et seq. of the California Civil Code, together with the reasonable cost of any litigation thereunder.

Final payment will be made within thirty (30) Days after receipt of an approved Final Invoice and other required Submittals referenced above or within sixty (60) Days after Acceptance of the work by the City, whichever is later, provided, however, that if an approved Final Invoice has not been submitted within sixty (60) Days after Acceptance of the Work by the City, the City may elect to make payment of sums not in dispute without prejudice to the right of either the City or the Contractor in connection with such disputed sums. Notwithstanding the foregoing, if a Notice of Completion is recorded, final payment shall not be made prior to the expiration of the thirty-five (35) calendar day lien period. The start of this lien period is the date the Placer County Recorder’s Office records the Notice of Completion.

The City may withhold from the Final Payment an amount not to exceed one hundred fifty percent (150%) of any amount in dispute between the City and the Contractor.

The making of Final Payment shall not operate to release the Contractor or its sureties from obligations arising under the Contract, the Contract bonds and warranties as herein provided. Specifically, the making of final payment shall not constitute a waiver and release of claims by the City arising from:

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1080 of 1714 ends

GC - 7:14
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024]

1. Unsettled or future liens;

2. Failure of the Work to comply with the requirements of the Contract Documents;

3. The terms of any warranties required by or contained in the Contract Documents;

4. The right to any insurance proceeds or the right to make any insurance or bond claims;

5. Any claims with respect to Contractor’s obligations of indemnity with respect to claims asserted by third parties; or

6. Any latent deficiencies with the Work or Contractor’s fraud. 7-1.11 CLERICAL ERRORS. Notwithstanding the provisions of Section 7-

1.10, “Final Payment,” of these General Conditions, for a period of three (3) years after Acceptance of the Work, all estimates and payments made pursuant to said Section 7-1.10, are subject to correction for clerical errors in the calculations involved in the determination of quantities and payments. The Contractor and the City agree to pay to the other any sum due under the provisions of this Section 7-1.11, provided, however, if the total sum to be paid is less than $100, no such payment shall be made.
7-1.12 WARRANTY. Notwithstanding inspections and Acceptance by the City of Work furnished under the Contract Documents, the Contractor hereby unconditionally guarantees that all materials and equipment furnished will be of good quality and new, that the Work will be free from defects in workmanship and materials and that the Work will conform to the requirements of the Contract Documents. Work not conforming to these requirements, including substitutions not properly approved and authorized, may be considered defective.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1081 of 1714 ends

GC - 7:15
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] This warranty by the Contractor is in addition to any warranties or guarantees required elsewhere in the Contract Documents. This warranty shall be in effect notwithstanding any disclaimers, or limiting or conditional terms contained in such separate warranties furnished by manufacturers or suppliers.

The Contractor hereby agrees to repair or replace any and all Work, together with any other adjacent Work which may be displaced in so doing, that may prove to be not in accordance with the requirements of the Contract or that may be defective in its workmanship or material during the greater of a period of one (1) year after Acceptance of the Work by the City or the period specified in the Special Conditions, without any expense whatsoever to the City, ordinary wear and tear and unusual abuse or neglect excepted.

The Contractor further agrees, that within ten (10) Days after being notified in writing by the Department of any Work not in accordance with the requirements of the Contract Documents or of any defects in the Work, the Contractor will commence and prosecute with due diligence all Work necessary to fulfill the terms of this warranty, and to complete such Work within a reasonable period of time. In the event Contractor fails to comply, it does hereby authorize the Department to proceed to have such Work done at the Contractor's expense and the Contractor will honor and pay the cost and charges therefore upon demand. The Department shall be entitled to all costs and expenses, including reasonable attorneys’ fees, necessarily incurred upon the Contractor's refusal to honor and pay the above costs and charges.

All warranties set forth in the Contract Documents shall be deemed cumulative and not alternative or exclusive. Nothing contained in this section shall be construed to establish a period of limitation with respect to any other obligation, which Contractor has under the Contract Documents or under any separate warranty or guaranty required thereby. The establishment of a

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1082 of 1714 ends

GC - 7:16
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] specific warranty period relates only to the specific obligation of Contractor to correct defective Work, and it has no relationship to the time within which its obligation to comply with the Contract Documents or applicable provision of law may be sought to be enforced, nor to the time within which proceedings may be commenced to establish Contractor’s liability with respect to its obligations other than specifically to correct the Work. Without limiting the foregoing, it is understood and agreed that Contractor shall remain responsible for latent defects with its work, regardless of the expiration of any warranty period set forth in the Contract Documents. 7-1.13 WARRANTY OF TITLE. No material, supplies, or equipment for the Work under this Contract shall be purchased subject to any chattel mortgage, security agreement, or under a conditional sale or other agreement by which an interest therein or any part thereof is retained by the seller or supplier. The Contractor warrants good title to all material, supplies, and equipment Installed or incorporated in the Work and agrees upon completion of all Work to deliver the Premises, together with all improvements and appurtenances constructed or placed thereon by it, to the City free from any claim, liens, security interest, or charges, and further agrees that neither the Contractor nor any person, firm, or corporation furnishing any materials or labor for any Work covered by this Contract shall have any right to a lien upon the Premises or any improvement or appurtenances thereon. Provided, that this shall not preclude the Contractor from Installing metering devices and other equipment of utility companies, the title of which is commonly retained by the utility company. In the event of the Installation of any such metering device or equipment, the Contractor shall advise the City as to the legal owner thereof. Nothing contained in this paragraph, however, shall defeat or impair the right of such persons furnishing materials or labor under any bond given by the Contractor for their protection or any rights under any law permitting such persons to look to funds due the Contractor in the hands of the City.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1083 of 1714 ends

GC - 7:17
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] The provisions of this paragraph shall be inserted in all subcontracts and material Contracts, and notice of its provisions shall be given to all persons furnishing materials for the Work when no formal Contract is entered into for such materials.
[END OF GENERAL CONDITIONS]

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1084 of 1714 ends

[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024]

SUPPLEMENTAL CONDITIONS
Project: ____________________________

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1085 of 1714 ends

SC - 1
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] Scope of Supplemental Conditions

1. The Work shall be performed in accordance with the General Conditions and Department Standards, except as the General Conditions may be modified by the following additional City Standards, incorporated herein by this reference, if so indicated.

COMMUNITY DESIGN GUIDELINES
311 Vernon Street, Roseville, CA 95678

SPECIFICATIONS FOR COMMERCIAL

CONSTRUCTION (ELECTRIC)
2090 Hilltop Circle, Roseville, CA 95747

PARKS CONSTRUCTION STANDARDS
316 Vernon Street, Suite 400, Roseville, CA 95678

DESIGN AND CONSTRUCTION STANDARDS
311 Vernon Street, Roseville, CA 95678
OTHER
Above documents are available at: www.roseville.ca.us.

2. Numbering in these Supplemental Conditions conforms to that in the General Conditions. The existence of a section in these Supplemental Conditions means that the corresponding section in the General Conditions is modified in some respect. Unless otherwise specified, the modified General Condition is deleted entirely and the provisions of these Supplemental Conditions are substituted.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1086 of 1714 ends

SC - 2
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] SECTION 1. DEFINITIONS AND TERMS
1-1.24 DEPARTMENT. Section 1-1.24 of the General Conditions is amended to include the following:

The Department for Contract Administration is the ________________________ Department of the City of Roseville.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1087 of 1714 ends

SC - 3
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] SECTION 2. CONTROL AND SCOPE OF THE WORK
2-1.08 SUBMITTALS. Section 2-1.08 of the General Conditions is amended to include the following:

The time allowed for review of each submittal is ____ Days after receipt of the submittal by the Director.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1088 of 1714 ends

SC - 4
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] SECTION 3. CHANGES IN THE WORK
There are no amendments to the General Conditions.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1089 of 1714 ends

SC - 5
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] SECTION 4. CONTROL OF MATERIALS
There are no amendments to the General Conditions.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1090 of 1714 ends

SC - 6
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] SECTION 5. LEGAL RELATIONS AND RESPONSIBILITY
5-1.14 AIR POLLUTION CONTROL AND ASBESTOS. Section 5-1.14 of the General Conditions is amended to include the following:

To the best of the City's knowledge, asbestos _________ present in the vicinity of the Project. Additional information shall be made available to Contractor upon request.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1091 of 1714 ends

SC - 7
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] SECTION 6. PROSECUTION AND PROGRESS
6-1.04 PROGRESS SCHEDULE. Section 6-1.04F of the General Conditions is amended to include the following:

Progress schedules showing project completion dates more than ________ Days earlier than specified in Section 6-1.07 shall be rejected. 6-1.07 TIME OF COMPLETION. Section 6-1.07 of the General Conditions is amended to include the following:

The Contractor shall begin Work within _____ business days after receiving a Notice to Proceed and shall diligently prosecute the Work to completion. The Work shall be completed within ____ business days of the Notice to Proceed.

If landscaping plants require an establishment period, that period will be ____ calendar days. Start of the establishment should be as outlined in the Specifications. 6-1.08 LIQUIDATED DAMAGES. Section 6-1.08 of the General Conditions is amended to include the following:

The amount of Liquidated Damages is the sum of $_________ per Day.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1092 of 1714 ends

SC - 8
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] SECTION 7: ACCEPTANCE AND PAYMENT
There are no amendments to the General Conditions.
[END OF SUPPLEMENTAL CONDITIONS]

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1093 of 1714 ends

SPEC
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024]

SPECIFICATIONS
Project: __________________________

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1094 of 1714 ends

JM-52 Park
October 2025
Table of Contents

Page 1 of 1 ends

TABLE OF CONTENTS

TABLE OF CONTENTS
SECTION 00 31 46 PERMITS
SECTION 01 10 00 SUMMARY OF WORK
SECTION 01 57 23 STORM WATER POLLUTION CONTROL
SECTION 03 30 00 SITE CONCRETE
SECTION 12 93 00 SITE FURNISHINGS
SECTION 26 00 00 SITE ELECTRICAL
SECTION 31 10 00 CLEARING AND GRUBBING
SECTION 31 20 00 EARTHWORK
SECTION 32 15 40 DECOMPOSED GRANITE PAVING
SECTION 32 84 00 IRRIGATION SYSTEM
SECTION 32 90 00 PLANTING
SECTION 33 00 00 UTILITIES

APPENDICES
A: Irrigation Schedules # pages
B: Soils Fertility Report # pages
C: Permits (provided by the City/Project Owner) # pages D: Environmental Document (provided by the City/Project Owner) # pages E: Geotechnical Report (provided by the City/Project Owner) # pages

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1095 of 1714 ends

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1096 of 1714 ends

JM-52 Park
October 2025
Section 00 31 46: Permits

Page 1 of 2 ends

SECTION 00 31 46

PERMITS
PART 1 - GENERAL

1.01 General Requirements
A. The requirements set forth in the General Conditions shall be in addition to the standards provided herein.

B. The requirements set forth in the Supplemental Conditions shall be in addition to the standards provided herein.

C. The intent of this Section is to furnish bidders with the known list of required permits for the Work under the Contract Documents. Bidders should note the list is not necessarily complete and additional requirements may exist or arise.

1.02 Permits
A. The Contractor shall obtain copies of the following permits from the Project Manager. Copies of these shall be obtained prior to start of work and shall be kept on the jobsite.

1. State Water Resources Control Board General Permit for Discharges of Storm Water Associated with Construction Activity.

2. City of Roseville Department of Development Services, Improvement Plan Permit for all Work related to this project.

3. City of Roseville Department of Development Services, Building Permit for all structural items associated with this project, including, but not limited to, lighting, , shade structures, drinking fountain (plumbing code), and miscellaneous electrical.

B. Contractor shall comply with the conditions of these permits, and will be solely responsible for all costs associated with meeting permit conditions unless specifically specified otherwise in these Contract Documents.

PART 2 - PRODUCTS
Intentionally left blank.

PART 3 - EXECUTION
Intentionally left blank.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1097 of 1714 ends

JM-52 Park October 2025
Section 00 31 46: Permits

Page 2 of 2 ends

END OF SECTION

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1098 of 1714 ends

JM-52 Park
October 2025
Section 01 10 00: Summary of Work

Page 1 of 10 ends

SECTION 01 10 00

SUMMARY OF WORK
PART 1 - GENERAL

1.01 General
A. The requirements set forth in the General Conditions shall be in addition to the standards provided herein.

B. The requirements set forth in the Special Conditions shall be in addition to the standards provided herein.

1.02 Project Description
A. Project Name and address:

JM-52 Park
5097 Misty Ridge Drive
B. Project description/scope of work:

The scope of this project includes … 1.5 acre park improvements C. The Contractor, prior to submission of his bid, shall visit the site and become familiar with the physical site conditions, the plans and specifications. All existing site conditions, apparent in a detailed, on-site inspection, shall be a part of the project. Submission of a bid shall represent the Contractor’s acknowledgment of the existing site conditions and its effect on the implementation of the contract documents.

1.03 Engineering
A. Field Engineering, as a part of this contract, shall include:

1. Layout of the work and establishment of lines and grades.

2. Said work to be performed by a California Registered Civil Engineer or a California licensed Land Surveyor.

3. When discrepancies between the drawings and actual site conditions are discovered, notify the Inspector for instruction on how to proceed.

4. All work shall:
a) Establish indicated layout in relation to the property survey and existing reference points.
b) Establish and preserve permanent reference points during the course of construction.
c) Set locations and elevations of all site elements as required for proper completion of the work.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1099 of 1714 ends

JM-52 Park October 2025
Section 01 10 00: Summary of Work

Page 2 of 10 ends

1.04 Permits, Fees and Notices
A. The Contractor and/or his assigned Subcontractors shall obtain any and all required permits (beyond those provided by the City’s Project Manager) from all governing authorities, including other City Departments, prior to start of construction.

1.05 Construction Plans
A. Any discrepancies or omissions found in the Contract Documents shall be reported to the City’s project manager immediately. The City’s project manager will clarify discrepancies or omissions, in writing, within a reasonable time.

B. In resolving inconsistencies among two or more sections of the Contract Documents, precedence shall be given in the following order:

1. Notice to Contractors

2. Special Provisions

3. City of Roseville Parks Construction Standards

4. City of Roseville Design and Construction Standards

5. Drawings
Addenda shall take precedence over all sections referenced therein. Figure dimensions on Drawings shall take precedence over scale dimensions.

Detailed Drawings shall take precedence over general Drawings.

1.06 Definitions
A. The term “accepted” where used within, shall mean accepted in writing by the City of Roseville’s Project Manager.

B. The term “Inspector”, where noted, shall mean the project representative, appointed by the City of Roseville, who will oversee the project on a day-today basis.

C. The term “Project Manager”, where noted, shall mean the project representative appointed by the Parks Department.

D. The term “Consultant”, where noted, shall mean the prime Consultant listed on the cover sheet of these Specifications.

E. The term “accepted equal”, where used herein, shall mean the equal in the opinion of the Project Manager, in consultation with the Consultant, when necessary, and as accepted in writing by the Project Manager.

F. The term “Project Owner”, where used herein, shall mean the landowner or developer.

G. The term “provide”, where used herein, shall mean furnish and install complete.

H. The term “as selected”, where used herein, shall mean as selected by the Consultant and as accepted by the Project Manager.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1100 of 1714 ends

JM-52 Park
October 2025
Section 01 10 00: Summary of Work

Page 3 of 10 ends

I. The term “substantially complete”, where used herein, shall mean the state of which the project can be used in the manner of which it is intended with the exception of minor items as determined by the Project Manager.

J. See Section 1 of the General Conditions for additional definitions and terms.

1.07 Standards
A. Numerous standards are referenced in these contract documents. The referenced standards shall be the current edition as of the date of these contract documents. Also, see Section 4 - 1.02 of the General Conditions.

B. The codes adopted by the City, County, State and federal agencies shall govern minimum requirements for this project. Where codes conflict with these Specifications, the more stringent shall apply, and such conflicts shall be brought to the attention of the Project Manager. Caltrans Standards shall be applied where specifically referenced. In the absence of specific reference requirements in the contract documents, the applicable codes shall govern.

C. In addition to the standards noted in individual sections of these Specifications, standards of the following organizations shall be noted by initials only.

1. ANSI: American National Standards Institute.

2. ASTM: American Society for Testing and Materials.

1.08 Submittals
A. All submittals shall be submitted at one time within ten (10) working days from issuance of Notice to Proceed. The review time for submittals shall be as noted in Section 2 - 1.04 of the Special Conditions. Items returned for re- submittal shall be returned to the City within two weeks
B. The Contractor shall include a cover sheet indicating the following (A sample is provided in Section 5: Forms):

1. Drawing sheet or specification section reference (by section, paragraph and sub-paragraph numbers);

2. Item description;

3. Indication whether this item is “as specified” or “proposed substitution” and

4. A space for itemized response summary, e.g. “reviewed” or “resubmit”.

C. Contractor shall provide submittals electronically in PDF file format and physical product samples as required in specifications. It shall be the Contractor’s responsibility to ensure the summary sheet is included in the submittal package. Incomplete submittal packages (i.e., the lack of a summary sheet or lack an appropriate product sample) will not be reviewed.

D. Proposed substitution requests must include a comparison between the originally specified item and the proposed substitute. The burden of proof of compliance for proposed substitutions with project requirements rests with the Contractor. Coordination of the installation of accepted substitutions, including

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1101 of 1714 ends

JM-52 Park October 2025
Section 01 10 00: Summary of Work

Page 4 of 10 ends

incidental changes/modifications to accommodate proposed products shall be at no additional cost to the Owner.

E. Where required in specified Section of these Specifications, submittals shall include proof of order of site furnishings, play equipment or other materials within two weeks (ten working days) of receipt of the returned, approved submittal. Submittals of orders shall be made at one time. Exceptions will be considered, with justification.

1.09 Tests
A. In addition to Section 4 - 1.03 of the General Conditions, testing and inspections may be performed by a private testing laboratory. The testing laboratory, provided by the City, shall be under the direction of a California registered civil engineer. All work shall conform to requirements set forth by ASTM B329, and shall be acceptable to the City.

B. Copies of the laboratory reports/results of each test or inspection shall be provided to the Project Manager, Inspector and Contractor.

1.10 Temporary Facilities
A. Sanitary provisions shall be the responsibility of the Contractor. Existing restroom facilities shall be not utilized by the Contractor, his Sub-contractors, or employees thereof, unless specifically accepted by the Project Manager.

Provide chemical toilets or water closets and urinals connected to the sewer in a location accepted by the Project Manager.

B. Barricades shall be the responsibility of the Contractor and shall be erected as necessary to protect the property, the construction and the public from hazards due to construction.

C. Signs, other than those identified in these Specifications, shall be prohibited.

Notices, required by law, shall be posted and maintained.

1.11 Utilities
A. All utility fees, including, but not limited to, connection fees, installation fees, meters, monthly service fees and cost of utilities used during the course of construction and establishment are considered a direct cost and are the responsibility of the Contractor until project acceptance by City Council.

1.12 Dust/Noise Control Requirements
A. Dust and other air pollution nuisances on or adjacent to the site shall be abated, per Section 2 - 1.15 of the General Conditions. Dirt shall not be allowed to accumulate on streets or sidewalks nor be washed into sewer.

B. Noise from construction operations shall be kept to a minimum. Allowable hours of operations shall be from 7 a.m. to 7 p.m. Monday through Friday. Work on

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1102 of 1714 ends

JM-52 Park
October 2025
Section 01 10 00: Summary of Work

Page 5 of 10 ends

weekends and holidays must be approved by the project manager. Work on weekends and holidays shall not begin before 8 a.m. and must be completed by 8 p.m.

1.13 Tree Replacement Schedule
A. Trees damaged or removed without prior approval shall be replaced at an inch per inch basis on-site, except otherwise accepted. New stock shall follow the table provided:

Plant Size Inch Value
3 Five Gallon Stock One Inch
1 Fifteen Gallon Stock One Inch
1 24” Box Stock Two Inches
1 36” Box Stock Three Inches

1.14 Inspection of Construction
A. In addition to the routine inspections performed by the Parks Inspector, portions of work may be inspected by the other city departments. Notify the Parks Inspector and Project Manager a minimum of 48 hours prior to date of inspection.

B. The Parks Inspector shall be the main line of communication between the site superintendent, the project manager and other City department inspectors.

Changes in scope of work or standards shall be approved by the project manager.

C. Refer to the parks inspection record. This shall be issued at the PreConstruction meeting and shall be utilized by the Contractor throughout the course of construction. A completed “hard card” shall be submitted to the Project Manager along with required turn in items (See 1.19 this Section) upon final acceptance of the project. The Notice of Completion shall not be filed until all record documents have been received and accepted.

1.15 Adverse Impacts to Site Conditions Due to Construction A. Impacts that affect the site conditions to the detriment of the park or streetscape impacts that affect the site conditions to the detriment of the park or streetscape construction or long term viability of the site shall be mitigated by the contractor prior to acceptance of the project. Such impacts shall include, but are not limited to:

1. Soil compaction in non-structural areas;

2. Diesel or gas fuel leaks/spillage;

3. Buried concrete or other construction debris;

4. Hazardous material contamination;

5. Lime treatment in planting areas;

6. and more.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1103 of 1714 ends

JM-52 Park October 2025
Section 01 10 00: Summary of Work

Page 6 of 10 ends

1.16 Pre-final (Punch List) Review
A. Notify, in writing, to the Parks Construction Inspector, that the work is substantially complete. Substantially complete is defined as “the state of work where it may be used in a suitable and intended manner with exception of minor corrections”. Partial acceptances will not be granted. Items to be reviewed as a part of substantial completion include:

1. All construction items

2. Installation of all site furnishings, including lights and signs

3. All planting, including mulch installation and weed control of planted areas. a) For sodded turf, upon sod installation
b) For seeded turf, upon second mowing as described in Section 329000, Part 3.11.

4. The irrigation system is fully functioning as designed and as confirmed by the landscape irrigation audit.

B. Within five workings days of receipt of notification, the Parks Construction Inspector will confirm substantial completion. The Parks Construction Inspector will schedule the punch list walk (pre-final review) within five working days after the project has been determined as substantially complete. A formal punch list will be developed at the punch list walk. The Parks Construction Inspector will provide a copy of the formal punch list to the Contractor within five working days of punch list walk. Performance of the punch list walk does not automatically trigger the start of establishment.

1. If at any point during this review it becomes apparent the Contractor has not properly prepared for the site review, the inspection shall immediately be terminated and re-scheduled at such a time as the site has been readied for a review. Any costs for the re-scheduling of the review shall be the responsibility of the Contractor. Lack of site preparation could delay start of the establishment period.

C. Concurrent to the pre-final review, the City will make a formal request for all required turn-in items to be submitted to the City. All turn-in items shall be submitted in their entirety to the City’s Park Construction Inspector. Partial turnin packages will be rejected.

D. Once all turn-in items have been confirmed to be complete and accurate, the establishment period may be considered to begin. The City shall have sole discretion in determining the appropriateness of the commencement of the establishment period and shall notify the developer/contractor in writing of the start and end dates. Portions of the project will not be accepted for establishment prior to the substantial completion of the entire project.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1104 of 1714 ends

JM-52 Park
October 2025
Section 01 10 00: Summary of Work

Page 7 of 10 ends

1.17 Establishment Period
A. The duration of the establishment period shall be:

1. For seeded turf in parks: Ninety (90) calendar days, minimum, and until the Notice of Completion (NOC) for City-built parks has been approved by the City Council, or the deed transferring property ownership, has been recorded at the County for Developer-built parks.

2. For sodded turf in parks: Forty-five (45) calendar days commencing between March 1st and October 31st and sixty (60) calendar days commencing between November 1st and February 28th, and until the Notice of Completion (NOC) for City-built parks has been approved by the City Council, or the deed transferring property ownership, has been recorded at the County for Developer-built parks.

3. For streetscapes: Thirty (30) calendar days, minimum, and until final acceptance of all related street improvements subject to approval of a Notice of Completion by the City Council. The inclusion of large box trees (36” box and greater) may require an extended establishment period of ninety (90) calendar days, as noted on plans.

B. Active maintenance is required throughout the entire establishment period.

Active maintenance is defined as:

1. All areas within the project site shall be protected against damage including vandalism, erosion, trespass, rodents and other acts. Immediately repair all damaged areas.

2. All walkways and paved areas shall be kept clean and all debris within planting and turf areas shall be immediately removed.

3. Automatic irrigation controller shall be fully utilized and irrigation system monitored and adjusted as described in Section 32 84 00 4.03.

4. All plant and turf maintenance as described in Section 32 90 00 3.11 C. Prior to the start of the final thirty (30) days of establishment:

1. All punch list items shall be completed.

2. All certifications and testing shall be completed.

3. All plantings and turf shall be thriving and in a healthy condition.

4. The lack of active maintenance prior to the final thirty (30) days may constitute a delay in the start of the final thirty (30) days of the establishment period.

1.18 Final Review
A. One (1) week prior to the end of the establishment period, a final on-site review shall be conducted to review project readiness for final turn-over. All punch list items must be satisfactorily addressed prior to the final review.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1105 of 1714 ends

JM-52 Park October 2025
Section 01 10 00: Summary of Work

Page 8 of 10 ends

B. The project shall be prepared and cleaned per Section 2 - 1.12 of the General Conditions; the turf shall be mowed; and the irrigation heads shall be adjusted appropriately one day prior to the scheduled final review.

C. Acceptance of the project shall be considered “field accepted” and a recommendation will be forwarded to the City Council for “final acceptance” per Section 7 - 1.01 of the General Conditions.

D. An unaccepted project shall extend the establishment period until such time as the unaccepted portions of the project have been reviewed and field accepted by the Inspector and Project Manager.

E. Turn over for City maintenance shall occur only after:

1. The specified duration of the establishment period has been successfully completed.

2. If required, the deed transferring property ownership, has been recorded at the County.

3. A Notice of Completion (NOC) for city-built parks and for streetscapes has been approved by the City Council.

F. Contractor shall provide a written guarantee covering all improvements associated with this project. See 1.19 – Warranties and Guarantees.

1.19 Record Documents
A. Record documents or as-built plans shall be maintained on-site and updated routinely as specified in Section 2 - 1.13 of the General Conditions. Record documents shall include all items under the contracted scope of work.

B. Record documents shall be submitted:

1. two sets 11 x 17 laminated reductions of the irrigation plan illustrating with colors the individual controller stations; and

2. Electronically submit PDF scanned images (in color) of the verified/initialed as-built drawings.

3. For City of Roseville CIP projects, SWPPP binder.

1.20 Warranties and Guarantees
A. Warranties are required under various Sections of these Specifications. Prior to final acceptance, the Contractor shall combine all warranties into a single electronically submitted PDF, . All warranties shall be clearly labeled and the number of years highlighted. Also, see Sections 7 - 1.10 and 7 - 1.11 of the General Conditions.

1. Warranties for equipment shall be submitted in the manufacturer’s standard form and shall be countersigned by the subcontractor or supplier and the Contractor.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1106 of 1714 ends

JM-52 Park
October 2025
Section 01 10 00: Summary of Work

Page 9 of 10 ends

2. All other warranties shall be provided in the following format, written on subcontractor’s or supplier’s letterhead, signed by the subcontractor or supplier and countersigned by the Contractor:

WARRANTY FOR YEARS
“We hereby warrant that the product which we have installed at project name has been done in accordance with the contract documents, and that the work, as installed will fulfill the warranty requirements included in the Specifications.

We agree to repair or replace any or all of our work, together with any other adjacent work which may be displaced by so doing, that may prove to be defective in its workmanship or material within the warranty period stated above commencing from the date of final acceptance of the above named project by the City of Roseville’s City Council, without additional expense to the City, ordinary wear and tear and unusual abuse or neglect excepted.

In the event of failure to comply with the above conditions within thirty (30) days of notification by the City, we collectively or separately do hereby authorize the City to proceed with the repairs or replacement of such defects at our expense. Payment of said costs and charges will be forwarded to the City upon demand.

Signed:

Subcontractor or Supplier Date
Countersigned:

Contractor Date
B. Guarantees shall be a minimum of one (1) year for all plant material, including trees and shrubs. The guarantee shall state that plant materials (trees & shrubs) to be free of all defects or disease and all plants are in a healthy and thriving condition at the completion of the contract. Deciduous plant material shall be warranted beyond the time of contract completion until such time as growth becomes evident.

PART 2 - PRODUCTS
Intentionally left blank.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1107 of 1714 ends

JM-52 Park October 2025
Section 01 10 00: Summary of Work

Page 10 of 10 ends

PART 3 - EXECUTION
Intentionally left blank.

END OF SECTION

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1108 of 1714 ends

JM-52 Park
October 2025
Section 01 57 23: Storm Water Pollution Control

Page 1 of 4 ends

SECTION 01 57 23

STORM WATER POLLUTION CONTROL
PART 1 - GENERAL

1.01 General
A. The requirements set forth in the General Conditions shall be in addition to the standards provided herein.

B. The requirements set forth in the Special Conditions shall be in addition to the standards provided herein.

1.02 References
A. State Water Resources Control Board Order No. WQ 2022-0057 DWQ National Pollutant Discharge Elimination System General Permit No. CAS0000002, for Storm Water Discharges Associated with Construction and Land Disturbance Activities.

B. CASQA California Stormwater BMP Handbook – Construction, October 2024.

1.03 Definitions
A. NOI: Notice of Intent
B. NOT: Notice of Termination
C. QSP: Qualified SWPPP Practitioner
D. QSD: Qualified SWPPP Developer
E. SWPPP: Storm Water Pollution Prevention Plan
F. SWRCB: State Water Resources Control Board
G. NPDES: National Pollutant Discharge Elimination System H. WDID: Waste Discharger Identification number
I. BMP: Best Management Practices
PART 2 - PRODUCTS
Intentionally left blank.

PART 3 - EXECUTION

3.01 SWPPP
A. Comply with State Water Resources Control Board Order No. WQ 2022-0057- DWQ National Pollutant Discharge Elimination System General Permit No.

CAS000002, for Storm Water Discharges Associated with Construction and Land Disturbance Activities.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1109 of 1714 ends

JM-52 Park October 2025
Section 01 57 23: Storm Water Pollution Control

Page 2 of 4 ends

B. A SWPPP has been developed for this project. The SWPPP is a dynamic document and will change as conditions (weather or construction phases) warrant.

C. Implementation of the SWPPP is the responsibility of the Contractor and a part of this project. Costs associated with implementation and maintenance of the BMPs per the SWPPP shall be included in the lump sum base bid.

D. Major changes to the SWPPP shall be reviewed by the City’s QSD prior to implementation. Cost associated with the major changes will be paid for using the unit cost listed in the Additions or Deletions Sheet of the Proposal E. The City’s QSD/QSP will perform weekly inspections of the jobsite.

Implementation of and minor changes to the SWPPP as directed by the City’s QSP shall be incidental to the Work. Contractor shall start all inspection corrective actions within 72 hours of observation, and complete as soon as possible.

F. All BMPs installed will be inspected by the City’s QSD/QSP for compliance with the SWPPP and BMP Fact Sheets. BMPs that are not in compliance shall be brought into compliance by the Contractor at no cost to the City.

G. An electronic copy of the SWPPP will be provided to the contractor. The contractor shall keep a binder on-site for inspection reports, and will make the inspection binder available upon request.

H. The SWPPP shall be readily available throughout the course of construction and until the NOT has been accepted by SWRCB. The SWPPP shall be made available upon request by a representative of the Regional Water Quality Control Board, State Water Resources Control Board, United States Environmental Protection Agency, or City’ storm water staff.

I. At the end of the establishment period, the Contractor shall submit copies of all inspection reports and sampling and analysis results to the City’s Project Manager.

3.02 Schedule
A. Contractor shall develop a Water Pollution Control Schedule that describes the timing of grading or other work activities that could affect water pollution. The schedule shall be updated by the Contractor to reflect changes in the Contractor’s operations that would affect the necessary implementation of water pollution control practices. The typical sequence of work shall be adjusted by the Contractor based on weather conditions and forecasted rain events. The schedule is considered an appropriate and applicable BMP.

3.03 Penalties and fines
A. Contractor is responsible for all penalties and fines assessed to or levied on the project related to the implementation of the SWPPP.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1110 of 1714 ends

JM-52 Park
October 2025
Section 01 57 23: Storm Water Pollution Control

Page 3 of 4 ends

B. In an effort to maintain compliance with the General Permit, the Contractor may be asked to make changes to the BMPs. If the Contractor is unable to perform these services in a timely manner the City reserves the right to address any areas of concern and deduct the cost from the contract.

3.04 BMP’s
A. Construction BMP’s shall be installed per the Erosion / Sediment Control Plan and project SWPPP, and in accordance with the CASQA California Stormwater BMP Handbook. Use of alternative BMP’s will be reviewed and accepted at the discretion of the City’s QSD.

3.05 Cleaning
A. Thoroughly clean all areas where work has occurred. Remove from the site excess material, debris and rubbish.

B. Take all precautions to protect completed work. Immediately repair or replace all damaged areas due to tire ruts, erosion, compaction failure, etc. Keep all erosion control measures intact.

3.06 Winter Construction Suspension
A. Contractor shall include a winter construction suspension as part of the construction schedule. The counting of working days will be suspended during the winter suspension period. It is at the City’s sole and complete discretion to determine the start and end dates of the winter construction suspension. The City will notify the Contractor 10 working days before the start of the winter construction suspension. The City will notify the Contractor 10 working days before the end of the winter construction suspension. The Contractor shall begin work within 15 calendar days after receiving the notice of the end of the winter construction suspension.

B. Contractor shall include an allowance of ($15,000) for the winter construction suspension per the bid documents. Costs associated with preparing the site for the winter construction suspension and costs associated with corrective actions required during the winter construction suspension will be paid for using the allowance on a Time & Materials Basis according to the allowable mark-ups in the project’s General Conditions, or per an approved lump sum or unit price quote. Costs to implement and maintain the BMPs per the Erosion and Sediment Control Plan are excluded from the winter suspension allowance and shall be included in the lump sum base bid.

C. Prior to the winter construction suspension, stabilize all exposed soils at the direction of the City’s QSD/QSP. In addition, all adjacent drainage inlets shall be protected and perimeter control shall be installed and in good repair.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1111 of 1714 ends

JM-52 Park October 2025
Section 01 57 23: Storm Water Pollution Control

Page 4 of 4 ends

D. Traffic on the construction site shall be kept to minimum. All traffic entering or exiting the site must use the stabilized construction entrance.

E. Where there are areas of concentrated runoff flows, Contractor shall protect the soil from erosion.

F. Per the Construction General Permit Requirements, inspections by the City’s QSD/QSP will continue into and through the winter suspension period.

Inspections will occur before, during, and after each Qualifying Precipitation Event (0.5” or more precipitation forecast in a 24 hour period) and at least once per week. Contractor shall start all inspection corrective actions within 72 hours of observation, and complete as soon as possible.

G.

H. The City’s QSD/QSP will be sampling discharges that occur during regular working hours during a Qualifying Precipitation Event (QPE) to ensure compliance with runoff standards for pH and turbidity. If the water sampling indicates compliance issues, Contractor shall make repairs or adjustments to BMPs immediately, and respond to any such requests within 24 hours.

END OF SECTION

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1112 of 1714 ends

JM-52 Park
October 2025
Section 03 30 00: Site Concrete

Page 1 of 5 ends

SECTION 03 30 00

SITE CONCRETE
PART 1 - GENERAL

1.01 General Requirements
A. The requirements set forth in the General Conditions shall be in addition to the standards provided herein.

B. The requirements set forth in the Supplemental Conditions shall be in addition to the standards provided herein.

C. The standards set forth in the City of Roseville Design and Construction Standards and the City of Roseville Parks Construction Standards, latest editions, shall be in addition to the standards provided herein.

1.02 Description
A. Furnish all labor, materials and equipment for the complete installation of all concrete work, flatwork and poured-in-place as shown in the Plans and as specified herein.

1.03 References
A. Caltrans Standard Specifications, latest edition.

B. California Building Code (CBC) and California Administrative Code (Title 24), latest editions.

1.04 Quality Assurance
A. For all flatwork, the Contractor shall pour a six-foot by six-foot (6’ x 6’) sample of each type of finish specified for review and acceptance by the Project Manager prior to pouring any concrete. The accepted samples shall remain onsite and intact until all concrete work has been completed. The quality of the concrete work shall be measured by the accepted samples.

B. During the course of construction, a qualified testing laboratory shall obtain samples as determined by the Inspector and conforming to federal and state codes and standards. Such costs shall be paid for by the City. Re-tests and removal of below acceptable strength concrete shall be borne by the Contractor.

The Contractor shall cooperate with the testing during the course of obtaining such samples.

C. Variances in surface grades of more than 1/8”, as measured by a straight edge ten feet (10‟) long, shall be corrected to the satisfaction of the Inspector.

Remove all areas where standing water occurs, including any surface irregularities.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1113 of 1714 ends

JM-52 Park October 2025
Section 03 30 00: Site Concrete

Page 2 of 5 ends

1.05 Handling and Storage
A. Comply with ASTM C-94, “Specifications for Ready Mix Concrete” for the batch, mix and transport of concrete.

B. Mix and deliver only the amount that will be poured immediately.

1.06 Record Drawings
A. The Contractor shall keep an accurate record of the as-built conditions of the site concrete. These records shall be updated daily and kept at the construction site. At any time, the Inspector may examine the conditions of the “as-builts” to ensure compliance of the above.

PART 2 - PRODUCTS

2.01 Concrete
A. Concrete for play area curbs, sidewalks, and accessible ramps shall conform to the provisions of Section 90-2 “Minor Concrete” of the Caltrans Standard Specifications. Cementitious material shall be „Type II Modified” and shall contain no less than 505 pounds of cementitious material per cubic yard.

Aggregate shall be not greater than one-inch or smaller than 3/8-inch. Submit concrete analysis for review and acceptance prior to placement of concrete.

2.02 Fiber Reinforcement
A. Fibers for concrete shall conform to ASTM C1116 Type III and manufactured specifically for the secondary reinforcement of concrete. Fiber length to be 0.50” or 0.75”. Acceptable products include Fibermesh 150, as manufactured by Sika USA, or accepted equal.

2.03 Expansion Joint Material
A. Fiber expansion joint shall conform to ASTM-1751 and shall be a nonextruding resilient filler. Filler shall have preserve attributes and high quality bituminous materials.

B. Apply Sikaflex elastomeric sealant, or accepted equal, over all expansion joints.

2.04 Concrete Forms
A. All forms shall be new at the start of the project.. Minimum size lumber shall be 2 x 6.

B. Radius bends shall be formed by spring steel forms or laminated boards, as required.

C. Plywood shall be 5/8”, Class I, exterior grade as outlined in APA “Guide to Plywood Grades”. Omit mill oiling treatment.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1114 of 1714 ends

JM-52 Park
October 2025
Section 03 30 00: Site Concrete

Page 3 of 5 ends

PART 3 - EXECUTION

3.01 Poured-In-Place Concrete
A. Concrete for hardscape or flatwork shall be placed on subgrade compacted per geotechnical engineer recommendations.. Prior to placement of concrete, a soils compaction test must be performed by an accepted soils testing professional on a representative number of locations along the flatwork area.

The City or project owner shall provide the initial test. The results of these tests must be available and meet acceptable levels prior to pouring. Re-tests and rework of any area, as directed by the soils professional, shall be the responsibility of the Contractor.

B. Construct forms to conform to the shapes, dimensions and details shown on the Plans. All forms shall be true to lines, plumb, level and square.

C. Forms shall not leak, spread, shift or settle when concrete is placed.

D. All forms shall carry dead and live loads and shall not deflect more than 1/8” between supports after placement of concrete.

E. All forms shall be thoroughly soaked a minimum of twelve (12) hours prior to pouring of concrete. Forms shall be treated per manufacturer’s recommendations.

F. Reuse of forms may be allowed at the discretion of the Inspector. Reused forms shall be cleaned and free of defects that would affect the final concrete finish.

G. Concrete footings shall be formed only when excavations slump or cave in.

Over-excavate the trench or footing diameter to accommodate the forms’ installation and removal. Apply water to moisten soil. Do not allow water to create mud or ponding.

3.02 Fiber Reinforcement
A. Install per manufacturer’s instructions. Apply at the batch plant prior to delivery.

Thoroughly mix fiber material to avoid “clumping”.

3.03 Expansion Joints
A. Expansion joints shall be placed where vertical elements meet horizontal paving unless otherwise noted on the Plans. This shall include vertical expansion joints on play area curb walls, buildings, shade structures, walls and/or planters. The corners of the paving shall be tooled at the expansion joints. Trim exposed fibers which protrude above or beyond the finish surface of paving or the finish surface of the wall.

3.04 Control Joints for Concrete Sidewalks
A. Control joints shall be per Parks Standard Details with deep, straight and finished with rounded edges. Control joints shall be placed (on-center) a

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1115 of 1714 ends

JM-52 Park October 2025
Section 03 30 00: Site Concrete

Page 4 of 5 ends

distance equal to the width of the concrete walkway, unless otherwise shown on the Plans. For example a ten-foot wide walkway shall have control joints placed ten feet on center. Control joints shall not dead-end into an adjacent panel, and shall not create acute angles that are prone to break off.

3.05 Placement of Concrete
A. Do not pour concrete in weather below 40 degrees F. or when temperatures are predicted to fall below freezing within 24 hours, except with prior authorization.

B. Concrete shall be transit mixed according to ASTM C-94. Discharge readymixed concrete from transport vehicle while the concrete is still plastic and before stiffening occurs.
.

C. Concrete shall be deposited up to the finished height of the forms and up to the adjacent joint. No partial pours will be allowed. Excess material shall be dumped on-site and later removed by the Contractor.

D. Thoroughly consolidate the concrete by manually spading and tamping concrete into all corners of the forms and by utilizing a high-speed mechanical vibrator. Retain a standby vibrator on-site during the course of concrete work.

When utilizing the vibrator, take precautions to avoid impact on the forms.

E. After obtaining uniform consolidation, screen tamper all flatwork surfaces, screed and bull float to ensure that large aggregates are pushed below the surface. When it is practical to work on the surface, wood float, steel trowel paving to a uniform surface.

F. Concrete elements shall not exceed the following tolerances:

1. Linear: 1/8”

2. Slab deviation: 1/8” in 10’

3.06 Finishes
A. Finishes shall be as shown on the Plans and shall be consistent in quality throughout the project. No visible cracks or discoloration will be accepted.

Finishes on vertical surfaces shall be consistent throughout. Vertical expansion joints are spaced as identified on the plans and are smooth with the finish surfaces. All edges for flatwork and vertical surfaces shall be eased at a consistent radius.

B. Upon completion of float finishing, provide the final finish as follows:

1. Medium Broom Finish: shall be accomplished by pulling a stiff bristle broom across a floated surface. The direction of the broom shall be perpendicular to the path of travel, unless otherwise shown on the Plans.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1116 of 1714 ends

JM-52 Park
October 2025
Section 03 30 00: Site Concrete

Page 5 of 5 ends

3.07 Removal of Forms
A. Form removal timing to be based on the concrete set strength and environmental conditions unless specifically called out on the drawings.

B. Remove all bolts, nails, ties, wires, etc. a minimum of one inch (1”) below the surface of the concrete. Remove imprints, irregularities or other such defects and patch as directed by the Inspector.

3.08 Curing and Protection
A. Allow adequate time for the concrete to cure. Contractor to take necessary steps to minimize evaporation and maximize the process of hydration.

B. Protect all concrete from damage during the curing period. Should damage occur, Contractor shall take immediate action to repair damage or replace damaged concrete to the satisfaction of the City.

3.09 Clean-Up
A. During the course of this work, the area shall be kept clear and free of debris as realistically as possible. Upon completion of concrete work, completely remove from the site all used forms, hardware, spillage, rejected work and other materials.

B. Remove from site furnishing posts all concrete “slobber”. Re-touch posts as necessary for a clean finish.

END OF SECTION

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1117 of 1714 ends

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1118 of 1714 ends

JM-52 Park
October 2025
Section 04 20 00: Unit Masonry (General)

Page 1 of 1 ends

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1119 of 1714 ends

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1120 of 1714 ends

JM-52 Park
October 2025
Section 05 12 00: Structural and Miscellaneous Steel (General)

Page 1 of 1 ends

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1121 of 1714 ends

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1122 of 1714 ends

JM-52 Park
October 2025
Section 09 91 00: Painting and Finishes (General)

Page 1 of 1 ends

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1123 of 1714 ends

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1124 of 1714 ends

JM-52 Park
October 2025
Section 12 93 00: Site Furnishing

Page 1 of 6 ends

SECTION 12 93 00

SITE FURNISHINGS
PART 1 - GENERAL

1.01 General Requirements
A. The requirements set forth in the General Conditions shall be in addition to the standards provided herein.

B. The requirements set forth in the Supplemental Conditions shall be in addition to the standards provided herein.

1.02 Description
A. Furnish all labor, materials and equipment for the complete installation of all site furniture, including play equipment and play surfacing, as shown on the Plans and as specified herein.

1.03 References
A. All play equipment shall meet or exceed the standards set forth by the Consumer Product Safety Commission (CPSC), comply with the Americans with Disabilities Act (ADA), meet all current ASTM standards and be consistent with State and local codes.

B. The play area surfacing shall meet or exceed the fall absorption/impact rates set forth by the CPSC guidelines and ASTM standards. The surfacing shall be an accessible surface and manufactured specifically for play areas.

C. Nothing in the Plans or Specifications is to be construed to permit work not conforming to regulating codes and standards. The Contractor shall furnish without extra charge any material and labor, when required, by the compliance with these rules and regulations, even though the work was not mentioned in these particular Specifications or shown on the Plans.

D. The product manufacturer shall supply complete Specifications for the installation of all site furnishings, including play equipment and play surfacing.

1.04 Submittals
A. Submittals for specified items are required. The Contractor shall submit a materials summary sheet indicating which items will be installed as specified and which items are proposed for substitutions. The Contractor shall submit proof of order within ten (10) working days of the Notice to Proceed, indicating all specified materials have been ordered, noting “as specified” or “substitution proposed”. For the following items, also provide:

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1125 of 1714 ends

JM-52 Park
October 2025
Section 12 93 00: Site Furnishing

Page 2 of 6 ends

1. Play Equipment and Swings submittals shall include color samples, manufacturer’s materials and parts list, and installation instructions.

2. All items with “color as selected by City” shall include color samples.

B. On the date of the Notice to Proceed, the Contractor shall immediately place the order to purchase all site furnishings, including the play equipment and play surfacing as specified on the Plans and as outlined herein. Proof of all orders shall be submitted to the Project Manager within ten (10) working days of the Notice to Proceed.

C. The Contractor shall submit a Certificate of Compliance from a third party certified playground inspector which verifies that the entire playground, including individual components, and surfacing meets or exceeds regulated requirements as described in Section 1.03 above.

1.05 Record Drawings
A. The Contractor shall keep an accurate record of the as-built conditions of the miscellaneous site amenities. These records shall be updated daily and kept at the construction site. At any time, the Inspector may examine the conditions of the “as-builts” to ensure compliance of the above.

PART 2 - PRODUCTS

2.01 Materials
A. Play Equipment shall be custom configuration as shown on the Plans and as specified herein. The equipment shall be as distributed by or accepted equal.

Color as selected by the City.

B. Engineered wood fiber shall be clean, engineered wood fiber, manufactured specifically for play areas.

1. Engineered wood fiber manufacturer shall provide testing certification by an independent testing agency that the results comply with CPSC guidelines and ASTM standards.

2. Engineered wood fiber shall meet the following requirements: ASTM F1951- 99 (ADA Compliance Test) and ASTM F 1292-96 (Shock Absorbency).

3. Manufacturer shall provide a Certificate of Insurance that shall provide coverage for products liability with the limit of liability not less than $1,000,000.

4. The manufacturer shall also provide written guarantee for three (3) years from the date of installation against decay and biochemical degradation calling for replacement of defective materials during the guarantee period.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1126 of 1714 ends

JM-52 Park
October 2025
Section 12 93 00: Site Furnishing

Page 3 of 6 ends

5. Manufacturer certifies that the engineered wood fiber has been installed in not less than three (3) sites for periods of not less than three (3) years demonstrating the claims made with regard to these Specifications.

C. Picnic Tables shall be as shown on the Plans and as specified herein. The tables shall be as distributed by Glen Wurster with All About Play at 916.417.8389 MyTCoator accepted equal. Tables shall be in-ground mount and made of perforated steel. Color as selected by the City.

D. Benches shall be as shown on the Plans and as specified herein. The benches shall be as distributed Glen Wurster with All About Play at 916.417.8389 MyTCoator accepted equal. Benches shall be made of perforated steel and surface-mount, unless otherwise specified on plans. . Color as selected by the City.

E. Drinking Fountain shall be MDF #10145 SM (bottle filler, dual bowl and accessible) and stainless steel surface carrier as distributed by Husbands and Associates (800) 821-9838 and as manufactured by Most Dependable Fountains or accepted equal. Color to be stainless powder coated black or as approved. Include recessed hose bib with locking cover, stainless steel control valves with O-rings, and external stainless steel surface mount carrier. Install with a sand strainer when sand amenities are included in the park design.

F. Park Identification Sign shall be fabricated by Quick Crete Products Corp., Norco, CA, (916) 447-8644, or by Outdoor Creations, Inc., Anderson, CA, (530) 365-6106, or accepted equal.

G. Play Area Age-Appropriate Signage shall contain the following language:
“This play area has been designed for the use of children aged (fill in the appropriate age range) years of age.”
H. Infographic Sign shall be a 24” by 18” digital high pressure laminate graphic panel fabricated or accepted equal. Plaque shall be mounted on a SlimLine single pedestal sign system or accepted equal. Manufacturer for the plaque and sign system (model # 2418 SL-SLP-AL) is KVO Industries (Chris Howell, (707) 573-6868). Installation location shall be verified in the field with the Project Manager. Final graphic panel to be provided by City of Roseville.

I. Scavenger Hunt Sign shall be a 24” by 18” digital high pressure laminate graphic panel fabricated or accepted equal. Plaque shall be mounted on a SlimLine single pedestal sign system or accepted equal. Manufacturer for the plaque and sign system (model # 2418 SL-SLP-AL) is KVO Industries (Chris Howell, (707) 573-6868). Installation location shall be verified in the field with the Project Manager. Final graphic panel to be provided by City of Roseville.

J. Playground rules sign shall be as fabricated by Gopher Sign Company, (651) 698- 5095, or accepted equal.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1127 of 1714 ends

JM-52 Park
October 2025
Section 12 93 00: Site Furnishing

Page 4 of 6 ends

K. Trash Receptacle shall be as shown on the Plans and as specified herein. The trash receptacle shall be as distributed by Glen Wurster with All About Play at 916.417.8389 MyTCoator accepted equal.

L. Other (See Design Guidelines for additional information) shall be as shown on the Plans and as specified herein. The fabric shade structure shall be as distributed by ( Glen Wurster with All About Play at 916.417.8389), and as manufactured USA Shade or accepted equal. Color as selected by the City.

M. Other (See Design Guidelines for additional information) shall be as shown on the Plans and as specified herein. The fitness equipment shall be as distributed by (Glen Wurster with All About Play at 916.417.8389), and as manufactured Greenfield Outdoor Systems or accepted equal. Color as selected by the City.

PART 3 - EXECUTION

3.01 Installation
A. Contractor to provide experienced workers or subcontractors to install all site furnishings, including the play equipment and play surfacing described in these Specifications. The workers or subcontractor must demonstrate that at least five (5) similar play structures and five (5) play surface applications similar to that specified for this project have been installed in the last three (3) years.

B. All site furnishing, including play equipment shall be installed per manufacturer’s instructions.

C. Engineered wood fiber shall be blown in place to avoid damage to adjacent improvements unless specifically approved by City.

D. Heights of tables and benches shall be as follows, unless otherwise required by ADA; California Title 24 or other code requirements:

Description Height Above Finish Grade
Table Surface Height 34” Maximum
Knee Space Height 27” Minimum Clear Space
Knee Space Depth 17” Minimum from edge of table to nearest obstruction under table top
Width of Knee Space 30” Minimum clear width beneath table Bench Surface Height 16” Minimum, 18” Maximum
E. Heights for play equipment, including ramps and transfer decks shall comply with the approved recommendations by the U.S. Architectural and Transportation Barriers Compliance Board: Play Facilities Regulatory Negotiation Committee.

F. For play equipment, locate all footings prior to installation of drain lines. Adjust drain lines to accommodate play structure footings. Provide appropriate fall zones as shown on the Plans and per applicable codes and guidelines.

G. All footings shall be Class A concrete with 3/4” maximum size aggregate, unless otherwise noted. Footings shall be in accordance with Caltrans

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1128 of 1714 ends

JM-52 Park
October 2025
Section 12 93 00: Site Furnishing

Page 5 of 6 ends

Standard Specifications, Section 90. Install all footings below finish surface. In paved areas, install paved surface over footing for a clean finished surface as shown on the Plans.

H. Carefully install all furnishings and equipment without disturbance to adjacent finishes. Contractor shall be responsible for the damage and subsequent repairs of damaged finished product.

I. Install park namesake plaque. Installation location shall be verified in the field with the Project Manager.

J. Install age-appropriate stickers on all play structures, per manufacturer’s instruction.

K. Install playground rules sign. Installation location shall be verified in the field with the Project Manager.

3.02 Cleaning
A. Thoroughly clean all areas where work has occurred. Remove from the site excess material, debris and rubbish.

B. Take all precautions to protect completed work. Immediately repair or replace all damaged areas due to tire ruts, erosion, compaction failure, etc. Keep all erosion control measures intact.

PART 4 - WARRANTY

4.01 General
A. Contractor shall warranty all site amenities included under this Section.

B. Contractor shall also provide a written warranty covering all materials, equipment and workmanship furnished by him to be free of all defects after installation is accepted, including all defective parts that may have been found.

C. Submit written warranty on company letterhead addressed to the City when providing As-built drawings.

D. Contractor shall submit to the City, upon completion of work, a Certificate of Compliance by a third party certified playground inspector for the installation of the play structure and safety surfacing. Certification shall include testing for compliance of ASTM 1292 (Impact Attenuation of Surfacing Systems under and around Play Equipment). All tests, including re-tests, shall be the responsibility of the Contractor. Submit all test results to the City.

E. Submit maintenance manual for poured-in-place resilient surfacing.

F. Contractor shall submit to the City, upon completion of work, a Certificate of Compliance from the manufacturer of the play structure for the installation of the play structure.

G. Contractor shall submit to the City, upon completion of work, critical fall criterion used to certify all play surfacing material.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1129 of 1714 ends

JM-52 Park
October 2025
Section 12 93 00: Site Furnishing

Page 6 of 6 ends

H. Attach cut sheets of installed items to the warranty.

END OF SECTION

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1130 of 1714 ends

JM-52 Park
October 2025
Section 26 00 00: Site Electrical

Page 1 of 6 ends

SECTION 26 00 00

SITE ELECTRICAL
PART 1 - GENERAL

1.01 General Requirements
A. The requirements set forth in the General Conditions shall be in addition to the standards provided herein.

B. The requirements set forth in the Special Conditions shall be in addition to the standards provided herein.

C. The standards set forth in the City of Roseville Design and Construction Standards, latest edition and requirements outlined by the City of Roseville Electric Department shall be in addition to the standards provided herein.

D. The standards set forth in the latest edition of the California Electrical Code (CEC), incorporating the latest edition of the NEC with City of Roseville amendments shall be in addition to the standards provided herein.

1.02 Description
A. Furnish all labor, materials and equipment for the complete installation of site electrical as shown in the Plans and as specified herein.

B. Submittals shall be required for requested substitutions or plan deviations ONLY. The Contractor shall install all specified electrical fixtures, poles and equipment, unless otherwise accepted and determined as an equivalent.

1.03 References
A. Conform to requirements outlined in the latest editions of the California Electrical Code (CEC), California Administrative Code (Title 24), California Building Code (CBC), California Administrative Code (Title 22) and other applicable codes.

B. Conform to requirements outlined in the latest edition of the Roseville Electric Specifications for Commercial Construction.

1.04 Record Drawings
A. Record drawings are required as a part of this work. At all times, the Contractor shall maintain accurate information of the work in progress. Deviation in layout of conduit or other materials shall be recorded to the satisfaction of the Inspector. Upon completion of the project, as-builts shall be submitted to the City on reproducible plan sheets and shall depict all changes in a neat and legible manner.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1131 of 1714 ends

JM-52 Park
October 2025
Section 26 00 00: Site Electrical

Page 2 of 6 ends

PART 2 - PRODUCTS

2.01 Service Panels
A. Service panels shall meet the Roseville Electric approved sections of the EUSERC requirements. The list of acceptable panels can be found at https://the.euserc.org/s/Roseville-City-of-Acceptability-Pages.pdf B. Service panel shall be:

1. Built to UL508A standards

2. Metered

3. Single phase or three phase application

4. Rated for 120 to 480 volts

5. Color: Hunter Green

2.02 Electronic Astronomic Time Switch
A. Electronic Astronomic Time Switch shall be DWZ Model series, as manufactured by Tork, or accepted equal.

2.03 Conduit and Fittings
A. For primaries (12,000 volts), conform to Roseville Electric’s Specifications for Commercial Construction, latest edition.

B. All other conduit and fittings shall conform to the California Electric Code, latest edition.

2.04 Wires and Cables
A. Conform to the California Electric Code, latest edition.

B. All wires shall be copper only, 90-degree-C THHN/THWN insulation.

2.05 Wire Connections and Devices
A. Conform to the California Electric Code, latest edition.

B. Splices and joints for #10 AWG or smaller wiring shall be twisted together electrically and mechanically strong and insulated with approved type insulated electrical spring connectors, Scotchlok or Ideal. Joints and connections for #8 AWG or larger shall be made with Burndy, T & B, or approved equal, solderless tool applied pressure lugs and connectors. Uninsulated lugs and wire ends shall be insulated with layers of plastic tape equal to insulation of wire and with all irregular surfaces properly padded with "Scotchfil" putty prior to application of tape. Tape shall be equal to Scotch #33, General Electric #AW-1, or approved equal. Feeder splicing is not permitted.

C. Receptacles: 15 & 20 Amp 125 Volt receptacles shall be "Specification" grade, duplex, UL Listed, rated Weatherproof where installed outdoors or in damp or wet locations. Where only one receptacle is connected to a 20 ampere circuit, a 20 ampere receptacle shall be used. Receptacles to be Hubbell 5262 series,

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1132 of 1714 ends

JM-52 Park
October 2025
Section 26 00 00: Site Electrical

Page 3 of 6 ends

5362 series, or equal. Provide an equipment grounding jumper (pigtail) connecting the grounding terminal of the receptacle to the grounded box.

2.06 Outlet Boxes
A. Cast Metal boxes shall be cadmium plated, cast iron alloy by Crouse-Hinds Form 8 condulets, Appleton Form 35 Unilets or accepted equal.

B. Cast Metal Outlet boxes shall be four inch (4”) round, galvanized cast iron alloy with threaded hubs and mounting lugs as required. Boxes shall be furnished with cast cover plates of the same material as the box and neoprene gaskets by Crouse-Hinds VXF series, Appleton JBX series or accepted equal.

2.07 Pull and Junction Boxes
A. Per City of Roseville Electric Department’s Specifications for Commercial Construction, latest edition.

2.08 Parts Identification
A. Consistent with the City of Roseville Electric Department’s Specifications for Commercial Construction, latest edition.

2.09 Electrical Support Equipment
A. Concrete Fasteners shall be Philips “Red-Head” or accepted equal. Powder driven concrete pin fasteners, low velocity type shall be Remington, Ramset or accepted equal.

B. Conduit Straps shall be hot dipped galvanized, cast malleable iron, one hole type strap with cast clamp-backs and spacers (as required) by O-Z/Gedney No. 15-50G strap and #14G spacer, Efcor No. 231 strap and No.131 spacer or accepted equal.

C. Concrete Inserts shall be pressed galvanized steel, spot insert with oval slot capable of accepting support nuts of ¼ inch to ½ inch diameter thread by Unistrut No. M2506 series, Globestrut CSI series or accepted equal.

D. Construction Channel shall be 1-1/2 inch by 1-1/2 inch 12 gauge galvanized steel channel with 17/32 inch diameter bolt holes, 1-1/2 inch on center, in the base of the channel by Kindorf 905 series, Unistrut P-1000-HS or accepted equal.

E. Cable Ties and Clamps shall be one piece, nylon, reusable type lashing tiesby Thomas and Betts Co “Ty-Raps”, Panduit “Pan-Ty” or accepted equal.

F. General Fasteners shall be wood screws for fastening to work; machine screws for fastening to steel; toggle bolts for fastening to gypsum board or plaster walls; expansion anchors for attachments to pre-poured concrete.

G. GFI Outlet Cover shall be metal, lockable, and flush with the surface it is installed in. Cover must conform to the California Electric Code, latest edition.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1133 of 1714 ends

JM-52 Park
October 2025
Section 26 00 00: Site Electrical

Page 4 of 6 ends

2.10 Fixtures and Poles
A. Parking Lot lights shall be:

B. Pathway/Security lights shall be:

1. LED: Hadco: RL54 B B N N 1 A W N N N A 2 N N N N SP1

2. Pod: die-cast aluminum housing with tool-less access

3. Globe: clear prismatic injection molded U.V. stabilized acrylic

4. Symmetric photometric distribution

5. Rated 120 volts
C. Poles shall be:

1. Whatley: TR34 16 DE BLK TXT 30-30 or accepted equal

2. Fiberglass, direct burial

3. Textured round, tapered

4. 16’ mounting height

5. Include –RC receptacle on select poles only, as shown on plans

2.11 Tracer Wire
A. Insulated solid copper wire, minimum #12 gauge.

PART 3 - EXECUTION

3.01 Installation
A. Install (luminaire and poles) in accordance to manufacturer’s instructions.

B. Ensure proper handling and installation of fixtures including hardware necessary for a complete installation. Fixtures (luminaire and poles) shall be clean, plumb and level.

C. All lamps shall be new and in operating condition. New lamps shall have less than 100 hours of operation on-site.

D. All splices in exterior fixtures or fixture outlet boxes shall be made watertight, using specified epoxy resin splicing kits.

E. Operate the entire system, once complete, in the presence of the Inspector.

Immediately correct any improper connections or other items.

F. Install concrete collars around light poles. Concrete collars shall be per the Parks Construction Standards, latest edition.

G. Install tracer wire on top of conduit for all up-lighting and sports field lighting.

3.02 Clean Up
A. At all times, maintain a safe and clean work site, free of debris and rubbish.

B. All electrical parts shall be clean of conductive and deleterious materials.

C. All enclosures shall be free of dirt and debris.

D. Clean all finishes and touch up damaged areas prior to pre-final inspection.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1134 of 1714 ends

JM-52 Park
October 2025
Section 26 00 00: Site Electrical

Page 5 of 6 ends

3.03 Excavation & Backfill
A. Refer to Section 33 00 00 Utilities.

3.04 Equipment Pads
A. Concrete reinforced pads for mounting of equipment (i.e. switchboard, transformers, freestanding panels, etc.) shall be minimum 3000psi, 6" thick with #4 rebar at 12" on center each way. Rebar shall be centered in pad. Pad shall extend 2" beyond equipment and 1.5" above surrounding area. Backfill and compact to 95% maximum dry density at optimum moisture content in layers not to exceed 6" when compacted.

3.05 Grounding
A. Grounding and ground bonding of the electrical installation shall be in accordance with CEC Article 250, and any applicable codes. Ground fittings shall be approved manufactured type, installed and connected to conform with Code requirements.

B. Neutral conductors and noncurrent-carrying parts of equipment at each installation shall be grounded in accordance with applicable code. Ground conductor shall be copper having a current capacity sized in accordance with CEC.

C. All equipment cases, motor frames, etc., shall be completely grounded to satisfy requirements of CEC. Install bond wire in flexible conduit. Install copper bond wire, sized in accordance with CEC, in all nonmetallic raceways and bond to all metallic parts using approved fittings.

D. Service ground conductor shall be connected to a "Ufer" encased ground and bonded to the metallic cold water pipe system and to the metallic natural gas line. 5/8” x 10 ft copper clad ground rods may be used in lieu of the Ufer ground where no footing is available.

E. All connections shall be made with solderless connectors or molded fusionwelding process.

F. Equipment grounding conductors shall be insulated with a continuous green outer finish along its entire length. Conductors size #4 AWG and larger may be identified (with green electrical tape applied half-lapped) at each end and at every point where the conductor is accessible. Tape shall be applied from its point of entry to point of exit or termination.

G. Insulated grounded (neutral) conductors shall be identified with a continuous white outer finish along its entire length. Neutral conductors #4 AWG or larger can be identified by a distinctive white marking (applied half-lapped with white electrical tape) for the last 12 inches at each end.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1135 of 1714 ends

JM-52 Park
October 2025
Section 26 00 00: Site Electrical

Page 6 of 6 ends

3.06 Field Testing
A. Perform Insulation Resistance (IR) "Megger" Testing per NETA Standards.

Submit test results. Provide testing for:

1. All feeders 100 Amps and higher.

2. Branch circuits 100 Amps and higher.

B. Each ground rod shall be tested. A ground rod which does not have a resistance to ground of 25 ohms or less shall be augmented by one additional ground rod at no less than 8 feet from each other.

3.07 Consultant to complete.

END OF SECTION

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1136 of 1714 ends

JM-52 Park
October 2025
Section 31 10 00: Clearing and Grubbing

Page 1 of 3 ends

SECTION 31 10 00

CLEARING AND GRUBBING
PART 1 - GENERAL

1.01 General Requirements
A. The requirements set forth in the General Conditions shall be in addition to the standards provided herein.

B. The requirements set forth in the Supplemental Conditions shall be in addition to the standards provided herein.

1.02 Description
A. Preserve and protect existing site amenities to remain, including, but not limited to, trees, shrubs, underground utilities and other improvements as shown on the Plans. Protection of work shall include affected improvements on adjoining properties.

B. Scope of work includes: site preparation, removal of debris, staging of equipment and materials and securing the site for construction.

1.03 Related Work
A. Section 31 20 00: Earthwork
B. Section 01 57 23: Storm Water Pollution Control

1.04 Protection/Replacement
A. Prior to demolition, erect protective fencing a minimum of one foot (1’) beyond the canopy of all trees to remain. The radius of the canopy shall be measured from the longest branch furthest from the trunk. Refer to the environmental document for additional requirements for protective fencing on other existing natural features. For work within or near protected trees, a tree permit may be required.

B. If public use is to be maintained on unaffected portions of the project site, the Contractor shall be responsible for directing pedestrian and vehicular traffic safely around the construction zone. Utilization of temporary fencing, barricades, signage, etc. shall be the responsibility of the Contractor. Safe detours shall be available to the general public at all times during the course of construction.

C. Protection of existing site improvements shown to remain, including, but not limited to, fencing, signs, benches, picnic tables, play structures, shade structures, drinking fountains, concrete paving, concrete wall and curbs,

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1137 of 1714 ends

JM-52 Park
October 2025
Section 31 10 00: Clearing and Grubbing

Page 2 of 3 ends

decomposed granite paving, asphalt concrete paving, recreational site improvements, etc. are to be protected and preserved.

D. The Contractor shall be responsible for any damage to and maintenance of all existing street improvements, drainage facilities and irrigation systems and to re-establish these improvements to their original condition as soon as possible after completion of the work in the area, to the complete satisfaction of the Project Manager and Inspector. Realignments or modifications to the existing facilities as shown on the plans are accepted.

E. Survey monuments and markers either shown on the Plans or encountered during the course of construction shall be protected and preserved. The Contractor shall notify the Inspector upon discovery of an unmarked monument, at which time, arrangements for the relocation or adjustment of the monument will be determined. All costs associated with the relocation or adjustment of these monuments shall be the Contractor’s responsibility.

F. Burning or burying removed material on-site is prohibited.

G. Where the removal of specific material creates an open hole, pit, trench or other depression, the Contractor shall immediately backfill and compact the areas consistent with requirements outlined in Section 31 20 00 of these Specifications.

H. All items identified in the Plans to remain or identified in the field to remain, removed in error by the Contractor, shall be repaired or replaced to match in equal or better construction, at no cost to the City. The quality of the repair or replacement shall be measured as that existing at contract award.

PART 2 - PRODUCTS
Intentionally left blank.

PART 3 - EXECUTION

3.01 Pre-Construction Site Review
A. Contractor shall review existing site conditions with the Inspector prior to start of construction and document any conditions which adversely affect the satisfactory execution of the work and final acceptance of the project.

B. Commencement of work constitutes acceptance of existing conditions. The Contractor shall, at his expense, be responsible for correcting all unsatisfactory and defective work.

3.02 Clearing
A. Completely remove trees, shrubs, stumps, vines, rubbish/debris, undergrowth, deadwood, structures, and other elements identified to be removed and/or which interfere with the construction as shown on the Plans and as specified.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1138 of 1714 ends

JM-52 Park
October 2025
Section 31 10 00: Clearing and Grubbing

Page 3 of 3 ends

B. Obtain verification from the Project Manager for non-identified items scheduled to be removed prior to actual removal.

3.03 Grubbing
A. Remove all stumps, roots, grasses and weeds in its entirety. Apply systemic weed killer. Confirm weed kill prior to removal.

B. For projects with native soils, once surface material is removed, the Contractor shall stockpile the top twelve inches (12”) of topsoil for use during the final grading phase of work. This soil shall be free of rocks, debris, roots and other undesirable material.

3.04 Utilities
A. Contact USA North 811 at (800) 642-2444, or submit an online ticket at USANorth811.org, prior to commencement of any demolition or excavation work. Provide a minimum of 48 hours’ notice. Verify all utilities entering into and their locations within the project site.

B. Where utilities lie within the project site, but are not a part of the project, the Contractor shall cooperate with the agency or utility company having jurisdiction to maintain its use and the integrity of the structure.

C. Where utilities enter into the project site and taps, connections to or extensions of the utility are identified in the Plans, the Contractor shall coordinate all work with the agency or utility company having jurisdiction to minimize or eliminate disruption of use by the adjacent properties.

D. Verify that all utilities, shown to be removed on the Plans, are inactive and turned off prior to disconnection and/or re-routing, prior to demolition.

3.05 Debris Removal
A. All materials removed as a part of this contract shall become the property of the Contractor and shall be legally disposed of off-site, unless otherwise noted on the Plans.

B. Where a portion of a concrete slab, curb or wall and asphalt concrete paving or curb is to be removed, the concrete shall be cut with a concrete saw at a 90 degree angle so that the edge of the remaining concrete shall form a neat, straight line. Conform to the City of Roseville Design and Construction Standards, latest edition.

END OF SECTION

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1139 of 1714 ends

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1140 of 1714 ends

JM-52 Park
October 2025
Section 31 20 00: Earthwork

Page 1 of 7 ends

SECTION 31 20 00

EARTHWORK
PART 1 - GENERAL

1.01 General Requirements
A. The requirements set forth in the General Conditions shall be in addition to the standards provided herein.

B. The requirements set forth in the Supplemental Conditions shall be in addition to the standards provided herein.

C. The standards set forth in the Caltrans Standard Specifications, latest edition, shall be in addition to the standards provided herein.

D. The requirements set forth by CAL OSHA shall be in addition to the standards provided herein.

1.02 Description
A. Provide all labor, operations and materials necessary for earthwork, including, but not limited to, staking and surveying, grading; excavating; installation of facilities necessary to perform excavation and subsequent removal of such facilities upon completion of work; subgrade preparation; backfilling; and other incidental items necessary for a complete project.

B. This project (is a balanced cut (requires export of material). The (export) of material shall be a part of the Contractor’s bid price.

C. The intent of the grading plan is to provide positive drainage and to maintain slopes on walkways as required by the Americans with Disabilities Act and California Title 24 throughout the project site. The Project Manager shall be notified immediately of any discrepancies between the Plans and actual field conditions and/or conflicts between the design and code requirements.

1.03 Related Work
A. Section 31 10 00: Clearing and Grubbing
B. Section 33 00 00: Utilities
C. Section 32 84 00: Irrigation System
D. Section 32 90 00: Planting
E. Section 26 00 00: Site Electrical
F. Section 01 57 23 Storm Water Pollution Control

1.04 Quality Assurance
A. All work shall conform to local codes and regulations, including standards set forth in the Standard Specifications of the State of California, Business and

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1141 of 1714 ends

JM-52 Park
October 2025
Section 31 20 00: Earthwork

Page 2 of 7 ends

Transportation Agency, Department of Transportation (Caltrans), Chapter 70 of the Uniform Building Code and ASTM.

B. Relative compaction shall be the in-place dry density of soil denoted as a percentage of the maximum dry density of the same material. This shall be as determined by ASTM 1557. The optimum moisture is measured by the water content which corresponds to the maximum dry density.

C. Upon discovery of unforeseen subsurface site conditions, the Contractor shall notify the Inspector immediately.

D. Upon discovery of hazardous materials, cease all activity and immediately contact the Fire Department.

1.05 Protection
A. Provide and install all supports, shoring, bracing, underpinning, sheet piling and other methods for the sides of excavations necessary for ensuring safe working conditions for the workmen and to protect adjacent improvements to remain.

B. Provide any and all protection measures necessary to ensure the protection of the workmen, the general public, including children and the project site. These protection requirements remain the Contractor’s sole responsibility throughout the duration of the project, including non-working hours.

C. Do not obstruct vehicular, bicycle or pedestrian thoroughfares, unless previously accepted by the City. Provide safe and adequate detours around the construction as required by City and State regulations.

D. Trenches shall be covered at all times when work directly associated with the trenches is not occurring, including non-work hours.

E. During the course of construction, the Contractor shall ensure surface drainage does not create a nuisance onto adjacent properties.

1.06 Erosion Control Measures
A. Construction sites shall have required erosion and sediment control measures in place as required by the SWPPP. If construction is in progress, the Contractor shall ensure the construction site is prepared prior to the onset of any storm. At a minimum, erosion control measures shall include:

1. Broadcast seed

2. Drainage area protection

3. Dust/mud control

4. Drain inlet filters

5. Silt fence and straw wattles

6. Slope protection

7. Straw bales

8. Silt controlling devices

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1142 of 1714 ends

JM-52 Park
October 2025
Section 31 20 00: Earthwork

Page 3 of 7 ends

PART 2 - PRODUCTS

2.01 Base Rock
A. Class 2 aggregate base per Caltrans Standard Specifications, latest edition.

2.02 Drain Rock
A. Drain rock shall be Class 2 permeable, washed, unbroken stone or gravel.

Material gradation shall conform to the following:

Sieve Size Percent Passing
1 inch 100
No. 4 20-50
No. 50 0-10
No. 200 0-5

2.03 Pea Gravel
A. Pea gravel shall be natural stone, free of clay, shale or organic matter, and shall conform to the following:

Sieve Size Percent Passing
3/8 inch 100
No. 4 47
No. 8 2
No. 16 1

2.04 Fill
A. Structural Fill shall conform to Caltrans Standard Specifications or the accepted site-specific geotechnical report generated for the project.

B. Fill for non-structural areas shall conform to the following standards:

1. Plasticity: ASTM D4318-84

2. Expansion Index: No greater than twenty (20)

3. Testing: UBC 29-9 and ASTM D422-72

4. Particle Size: No greater than one inch (1”)

2.05 Topsoil
A. The top eight to ten inches (8” – 10”) of native soil containing more than three percent (3%) organic material. Topsoil shall be free of rocks no larger than one inch (1”) in diameter, free from subsoil, roots, heavy or stiff clay, course sand, destructive seeds, noxious chemicals, brush, debris, litter and other undesirable materials.

B. For any import soil to be used in turf/planting areas, submit a soils analysis with soil amendment recommendations (for plant growth) for review and acceptance prior to placement on-site. Soils test information shall be as outlined in Section 32 90 00: Planting – 1.06.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1143 of 1714 ends

JM-52 Park
October 2025
Section 31 20 00: Earthwork

Page 4 of 7 ends

2.06 Soil Sterilant
A. Sterilizer shall be standard, quick-acting, short-lived and non-selective weed and grass killer, commonly used under roadway/transportation projects.

Application of the sterilant shall pose no short or long term health threats to the installer or the general public. Submit analysis for approval prior to applying.

2.07 Sand
A. Granular, fine, free of organic matter, mica, loam or clay material.

PART 3 - EXECUTION

3.01 Construction Staking
A. The layout of all work shall be performed by a California State licensed land surveyor provided by the Contractor.

B. Notify the Inspector immediately of any discrepancies between actual field conditions and the Plans. Minor field adjustments may be necessary in order to fulfill the intent of the Plans.

C. Non-notification of discrepancies between actual field conditions and the Plans by the Contractor, in writing, shall indicate his acceptance of such field conditions. Adjustments/modifications to the construction to accommodate the inconsistencies (without notification) shall be at no additional cost to the City.

3.02 Excavation
A. All excavations shall be as noted on the Plans. Excavations shall include accommodation of base material.

B. Do not over-excavate. Excavations shall provide appropriate space to install shoring, bracing, formwork, etc., as needed to ensure the safe and proper construction of the work.

C. Take every precaution to prevent water from entering, softening, and undercutting excavated areas, including, pits, footings, trenches, etc.

D. Notify the Inspector immediately upon discovery of unsatisfactory soils materials or unforeseen site conditions. Excavation shall include the complete removal of the unsatisfactory material and its legal disposal thereof.

3.03 Site Grading
A. A grading permit is required to be obtained by the Contractor prior to commencing any earthwork.

B. Grading shall include adjacent transition areas, new elevations/contours as shown on the Plans. All subgrade areas shall be graded parallel to the finish grades and contours and shall be uniform in slope. Transition areas shall provide a smooth connection between new and existing grades and shall not create additional drainage or ponding onto adjoining properties.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1144 of 1714 ends

JM-52 Park
October 2025
Section 31 20 00: Earthwork

Page 5 of 7 ends

C. Surface grades shall provide for positive drainage away from structures and footings, and shall be uniformly smooth throughout.

D. Rough grading shall:

1. Be graded to a tolerance of 0.10 feet, plus or minus for planted and turf areas.

2. Be graded with a tolerance less than .04’ from specified grade and cross section for subgrade in which pavement, curbs and other structural elements are to be placed immediately above.

3. Provide a subgrade surface free of exposed rocks, stones and boulders.

4. Provide a subgrade surface free of depressions, pits, etc., with proper backfill and compaction. See paragraph 3.04 below.

3.04 Placement of Fill Material
A. Prior to placement of fill material, the Contractor shall:

1. Obtain approval of the subgrade surface from the Inspector.

2. Scarify, dry and compact soft and/or wet areas.

3. Remove and replace unsuitable subgrade material to the satisfaction of the Inspector.

4. Take all necessary corrective action.

B. Do not use topsoil as fill or backfill material, unless otherwise accepted in writing.

C. Fill shall be placed in the following manner:

1. Accepted engineered fill material for structural slabs and areas to be paved shall be placed in six-inch (6”) loose thickness, uniform layers over the entire area.

2. Fill material in planted areas shall be placed in twenty-four inch (24”) maximum loose thickness throughout the areas to receive fill.

D. Aerate or water each lift to obtain the required compaction rate indicated on the Plans. Thoroughly mix material to ensure proper moisture content for compaction. Repeat the operations until grades, as shown on the Plans, are obtained. Jetting of trenches shall be reviewed and accepted by the Inspector prior to performance of work.

E. Do not place fill when the subgrade is frozen, muddy or wet. Allow conditions to thaw and dry out before resuming operations.

F. Use hand tampers or vibrating compactors around foundations walls, retaining walls and other structural elements. Do not use large equipment in these areas and do not begin compaction operations until the bearing surfaces have reached its design strength.

G. Fill around existing trees to remain shall not exceed twelve inches (12”).

1. Minor fill (6” or less) shall utilize topsoil and shall be placed by hand. Do not cover crown of trunk. Feather grades to the extent possible.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1145 of 1714 ends

JM-52 Park
October 2025
Section 31 20 00: Earthwork

Page 6 of 7 ends

2. Fills between 6” and 12” shall utilize 3/4” pea gravel on grade, placed up to three inches (3”) below finish grade. Apply topsoil, by hand, to meet finish grade elevations. Feather grades to the extent possible.

H. Construct mounds from on-site material. The core of the mound (1’ below finish elevations) shall be compacted to 90%. The top twelve inches (12”) shall be compacted to 85%. Place topsoil in the top twelve inches (12”).

I. Place topsoil in all turf and planting areas a minimum of twelve (12) inches deep.

See Section 31 10 00, 3.03-B: Clearing and Grubbing.

3.05 Trenching, Backfilling and Compacting
A. For trenches greater than five feet (5’) in depth, submit an OSHA permit related to the work.

B. All trenches shall be straight, true and cut vertical at 90 degrees to the surface plane.

C. For trenches through existing paved surfaces, use a concrete saw or other tool to achieve straight, clean lines. Replace paved surface to the same or better condition as existing prior to cut.

D. Do not over-excavate. Maintain bearing surfaces true, level and undisturbed to the extent possible.

E. Trenches shall be kept dry and frost-free. Do not allow standing water to collect.

F. Do not allow trenches to remain exposed at any time when work directly related is not occurring. Cover all trenches during non-work hours.

G. Bedding for all trenches to receive pipes shall be as follows:

1. Bedding material shall be consistent with the City of Roseville Design and Construction Standards, latest edition.

2. Pipe shall lie completely on bedding. Pipe fittings or joints shall not bear weight.

3. Bedding shall be uniform throughout the length of pipe.

H. Initial backfill for storm drains, sewer lines and electrical conduit shall conform to the applicable City standard set forth by the Department having jurisdiction.

I. Backfill beyond the initial operations shall be native soil, placed in twelve-inch (12”) lifts. Compaction for trenched areas shall be 95% for parking lot, driveway and roadway areas; 90% for hardscape (i.e. walkways, picnic pads basketball and tennis courts); and 85% in areas to be planted. Place topsoil over trenches in planted areas. Upon completion, all trenches shall be filled flush with adjacent finish grades.

J. Compaction tests shall be required for trenched areas, hardscape areas and areas where fill over two feet in depth will be placed. The Inspector shall determine the number of tests and the locations. Re-tests shall be the Contractor’s responsibility.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1146 of 1714 ends

JM-52 Park
October 2025
Section 31 20 00: Earthwork

Page 7 of 7 ends

K. Potholing shall be required in areas where existing utilities are indicated. Hand digging may be required.

3.06 Soil Sterilant
A. Soil sterilant shall be applied to areas where paving is to be installed. The worker applying the sterilant shall take every precaution to avoid overspray of sterilant onto areas to be planted. The sterilant shall be placed no further than six inches (6”) beyond the edge of pavement.

B. Soil sterilant shall not be applied in inclement weather and windy days.

3.07 Drainage Areas
A. All bare areas, regardless of slope, within 50 feet of natural drainages shall be covered with straw and pressed in place.

B. No grading or trenching, except as required for erosion or sediment control, shall occur within 35 feet from the centerline of perennial and intermittent drainage swales between October 5 and April 1 unless approved by the Engineering Division, as well as any other governmental agency which may have additional jurisdiction and/or requirements.

3.08 Dust/Mud Control
A. Adjacent Streets: Adjacent street frontages shall be swept at least once a day to remove silt and other dirt which is evident from construction activities.

B. Construction Vehicles: The Contractor is responsible for cleaning construction vehicles leaving the site on a daily basis to prevent dust, silt, mud and dirt from being released or tracked offsite. Adjacent streets shall be swept clean daily.

C. Grading Spoils: Dry stockpiles of soil shall be watered to prevent the generation of airborne dust. Trucks transporting dry soil shall be covered with tarpaulins.

D. Water: Water shall be sprayed on all exposed earth surfaces during clearing, grading, earth moving and other site preparation activities. The exposed earth shall be watered throughout the day to minimize dust. The Contractor shall obtain a hydrant permit from the Environmental Utilities Department.

E. Wind Allowances: Grading activities shall be restricted or halted when winds exceed 15 miles per hour as deemed necessary by the Public Works Inspector.

END OF SECTION

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1147 of 1714 ends

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1148 of 1714 ends

JM-52 Park
October 2025
Section 32 12 16: Asphalt Concrete Paving

Page 1 of 1 ends

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1149 of 1714 ends

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1150 of 1714 ends

JM-52 Park
October 2025
Section 32 15 40: Decomposed Granite Paving

Page 1 of 2 ends

SECTION 32 15 40

DECOMPOSED GRANITE PAVING
PART 1 - GENERAL

1.01 General Requirements
A. The requirements set forth in the General Conditions shall be in addition to the standards provided herein.

B. The requirements set forth in the Supplemental Conditions shall be in addition to the standards provided herein.

C. The standards set forth in the City of Roseville Design and Construction Standards and the City of Roseville Parks Construction Standards, latest editions, shall be in addition to the standards provided herein.

1.02 Description
A. Furnish all labor, materials and equipment for the complete installation of decomposed granite paving, including redwood headers as shown in the Plans and as specified herein.

1.03 References
A. Caltrans Standard Specifications, latest edition.

1.04 Submittals
A. Submittals for specified items are not required; however, submittals are required for any proposed substitutions or deviations from the Plans or Specifications. Additionally, submittals are required for the specific items listed below. The Contractor shall submit a materials summary sheet indicating which items will be installed as specified and which items are proposed for substitutions. The Contractor shall submit proof of order within ten (10) working days of the Notice to Proceed, indicating all specified materials have been ordered, noting “as specified” or “substitution proposed”. Submittals are required on the following items:

1. Decomposed granite material and binding material: provide a sample “brick” for review and approval.

PART 2 - PRODUCTS

2.01 Crushed Quarry Rock
A. Crushed rock, graded between #4 and #200. Rock shall be high quality and well-graded.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1151 of 1714 ends

JM-52 Park
October 2025
Section 32 15 40: Decomposed Granite Paving

Page 2 of 2 ends

B. Hastie’s Capitol Sand and Gravel, Roseville, CA (916) 989-4600 or accepted equal.

2.02 Header
A. 1”x6”or 2”x6” Redwood header board.

2.03 Binding Material
A. PolyPavement, Los Angeles, CA (323) 954-2240 or accepted equal.

PART 3 - EXECUTION

3.01 Preparation
A. Upon completion of grading operations, compact the subgrade at the required elevation to a relative compaction density of 95%, unless otherwise noted on the Plans.

B. Completely install redwood header as shown in the City of Roseville Parks Construction Standards.

C. No material shall be placed in muddy conditions, nor shall any material be placed during or immediately after inclement weather, i.e. rain storms, etc.

3.02 Installation
A. Provide a 10’ by specified width test sample, to be approved prior to installation.

This sample shall be the basis of overall approval.

B. Thoroughly combine binder per manufacturer recommendations.

C. Spread crushed granite fine/binder material in two (2) one and one half inch (1- 1/2”) lifts (thickness after compaction).

D. Wet and roll each lift to form a uniform, smooth surface with a cross slope of 2%. Compact each lift to a 95% relative compaction density.

E. Upon completion of the final lift, fill any depressions, holes or divots and re- roll using the above process.

F. Provide a Certificate of Compliance verifying the binder/stabilizer has been mixed per manufacturer’s recommendations.

3.03 Clean Up and Protection
A. Thoroughly clean all areas where work has occurred. Remove from site excess material, debris and rubbish.

B. Take all precautions to protect completed work. Immediately repair or replace all damaged areas due to tire ruts, erosion, compaction failure, etc.

END OF SECTION

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1152 of 1714 ends

JM-52 Park
October 2025
Section 32 31 13: Chain Link Fencing

Page 1 of 1 ends

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1153 of 1714 ends

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1154 of 1714 ends

JM-52 Park
October 2025
Section 32 32 19: Modular Concrete Retaining Walls

Page 1 of 1 ends

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1155 of 1714 ends

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1156 of 1714 ends

JM-52 Park
October 2025
Section 32 84 00: Irrigation System

Page 1 of 18 ends

SECTION 32 84 00

IRRIGATION SYSTEM
PART 1 - GENERAL

1.01 General Requirements
A. The requirements set forth in the General Conditions shall be in addition to the standards provided herein.

B. The requirements set forth in the Supplemental Conditions shall be in addition to the standards provided herein.

1.02 Description
A. Furnish all labor, materials and equipment for the complete installation of an automated irrigation system, including all necessary appurtenances for proper operation, noted or implied, as shown on the Plans and as specified herein.

B. Water usage, meter costs, connection fees, testing and other associated utility costs are considered direct costs and is the responsibility of the Contractor until the project is accepted.

C. Installation of the water meter shall be by the City.

1.03 Related Work
A. Section 32 90 00: Planting
B. Section 26 00 00: Site Electrical

1.04 Quality Assurance
A. All work shall comply with local and state laws, codes, regulations and requirements which govern any portion or all of the work contained in this Section. These include, but are not limited to, the latest editions of:

1. City of Roseville Park Construction Standards,

2. City of Roseville Design and Construction Standards,

3. City of Roseville Electric Department Standard Specifications,

4. Local, state and federal electrical codes, manuals and guidelines, and

5. Local, state and federal plumbing codes, manuals and guidelines.

1.05 Submittals
A. Submittals for specified items are not required for Parks or Streetscape projects, unless specifically listed below. However, submittals are required for any proposed substitutions or deviations from the parks Plans or Specifications. For Streetscapes, no substitutions will be accepted. The Contractor shall submit a materials summary sheet indicating which items will be installed as specified

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1157 of 1714 ends

JM-52 Park
October 2025
Section 32 84 00: Irrigation System

Page 2 of 18 ends

and which items are proposed for substitutions. The Contractor shall submit proof of order within ten (10) working days of the Notice to Proceed, indicating all specified materials have been ordered, noting “as specified” or “substitution proposed”. Submittals are required on the following items:

1. Controller, Flow Sensor(s), and Master Valve(s).

2. Filter (Recycled water)

1.06 Explanation of Drawings
A. The drawings are diagrammatic and do not reflect all offsets, fittings and other miscellaneous items required for a complete and operable irrigation system. It shall be the Contractor’s responsibility to investigate all existing site conditions, become thoroughly familiar with the site, and provide all labor, materials and equipment required for the installation of the irrigation system.

B. Avoid conflicts between other trades and the installation of the irrigation system.

Minor adjustments to avoid such conflicts shall be made in the field. Major discrepancies between actual field conditions and the Plans shall be brought to the attention of the Project Manager. The lack of notification shall indicate the Contractor assumes full responsibility for any revision deemed necessary to ensure proper installation.

1.07 Product Delivery, Handling and Storage
A. All materials shall be delivered bearing manufacturer’s label with size, type and model number (if applicable) clearly marked.

B. All pipe shall be delivered in a vehicle which allows the material to lie flat without concentrated weight or stress at any point.

C. Unload all materials with care so as to avoid damage. Store materials in a covered area and do not expose PVC pipe to extreme sun or heat. Store pipe lying flat.

D. Do not install any material that has been damaged. Replace all material found to be damaged.

1.08 Record Drawings
A. The Contractor shall keep an accurate record of the as-built conditions of the irrigation system. These records shall be updated daily and kept at the construction site. At any time, the Inspector may examine the conditions of the “as-builts” to ensure compliance of the above.

B. Dimensions shall be recorded from two (2) permanent points of reference.

C. The City may at its discretion withhold progress payments to the Contractor if the as-built records are not updated to the satisfaction of the City.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1158 of 1714 ends

JM-52 Park
October 2025
Section 32 84 00: Irrigation System

Page 3 of 18 ends

PART 2 - PRODUCTS

2.01 General
A. All materials specified shall be new, bearing the brand name, type, serial numbers and model number as shown on the Plans and as specified herein, unless otherwise accepted in writing.

2.02 Backfill Material
A. Backfill shall be clean, screened, on-site material, free from organic material, large clods of earth and/or rock larger than one (1) inch in diameter, trash, debris, rubbish, tree trunks, broken concrete or asphalt and other unacceptable material.

B. Material larger than one (1) inch shall be removed from site and legally disposed. All removal shall be the responsibility of the Contractor.

2.03 Meter
A. Meter shall be as shown on the Plans and as required by the City of Roseville Environmental Utilities Department.

2.04 Backflow Prevention Device
A. Backflow Prevention Device shall be as shown on the Plans.

B. Cover shall be insulated, freeze-proof, removable and lockable, manufacturer and model per the City of Roseville Design and Construction Standards or accepted equal.

2.05 Filter (Recycled Water Only)
A. Amiad Filtration Systems, filter with scanaway semi-automatic assembly and 130 micron filter screen

1. For 2”, Plastic Super-T Semi-Automatic Filter.

2. For 3” and above, Steel In-line Semi-Automatic Filter.

3. Include Scanaway 130 micron filter element.

4. Match line size of recycled water meter, down to 2” minimum.

5. Include lockable protective frost cover blanket.

2.06 Flow Sensor and Master Valve
A. Calsense Controllers:

1. Flow sensor shall be a Calsense Ultrasonic Flow Meter (FM-2U), or accepted equal. Flow sensor shall be accurate to +/- 2% of full scale. Flow sensor body shall be constructed of Schedule 80 PVC for sizes up to 4”, and saddle taps for sizes 6” and above.

2. Master valve(s) shall be Superior, 3300 series, normally open, electric globe valve, constructed of brass with dirty water protection and No Minimum Flow

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1159 of 1714 ends

JM-52 Park
October 2025
Section 32 84 00: Irrigation System

Page 4 of 18 ends

feature. For recycled water systems, include -RW Recycled Water designation with purple handle for identification.

3. Flow meters to be constructed consistent with the Calsense specifications.

4. Valve boxes for master valve and flow sensor shall be 18” (jumbo) green rectangular rigid plastic valve boxes with lockable lids and extensions by Carson Industries, LLC or accepted equal. Valve box lid shall be colored green in potable water system applications and purple for recycled water system applications.

2.07 Pipe
A. PVC Pressurized Mainline

1. For lines three inch (3”) or larger: polyvinyl chloride (PVC) 1120-1220, SDR 21, Class 200 rubber gasketed pipe, and NSF accepted per Standard No. 14, Type I, Grade I. Conform to:

Material ASTM
Pipe D1784, D2241
Rubber Gasket F477

2. For lines two and one half inches (2-1/2”) or smaller: Schedule 40 polyvinyl chloride (PVC) 1120-1220, and NSF accepted per Standard No. 14, Type I, Grade I. Conform to:

Material ASTM
Pipe D1784, D1785
B. PVC Non-Pressurized Lateral Lines

1. Schedule 40 polyvinyl chloride (PVC) 1120-1220, SDR 21.0, NSF accepted per Standard No. 14, Type 1, Grade II.

C. Recycled Water

1. Pipes shall meet the standards outlined in Sections 2.08, A and B above, unless otherwise noted in the City of Roseville Design and Construction Standards for recycled water, latest edition.

2. All pipes containing recycled water shall be purple, NSF accepted and conform to the City of Roseville Design and Construction Standards, latest edition.

2.08 Fittings and Nipples
A. Fittings for Mainline Pipe:

1. For all control valves on mainlines three inches (3”) and larger, use painted, ductile iron saddle taps with double stainless steel straps and nuts. Model #202 by Romac Industries, Inc. or accepted equal.

2. For all other connections on mainlines three inches (3”) and larger mainline pipe, use glued schedule 80 fittings.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1160 of 1714 ends

JM-52 Park
October 2025
Section 32 84 00: Irrigation System

Page 5 of 18 ends

3. For all control valves on mainlines two and one half inches (2-1/2”) or smaller, use glued schedule 80 fittings.

4. For all other connections on mainlines two and one half inches (2-1/2”) or smaller, use glued schedule 40 fittings.

B. Fittings for Solvent Weld Pipe- Laterals:

1. Schedule 40 polyvinyl chloride (PVC), standard weight, conforming to ASTM D2466-73.

2. Weld-on #P-70 primer and Weld-on #711 gray glue or accepted equal.

3. Teflon tape for all threaded PVC fittings.

C. Plastic Nipples shall be Schedule 80, Type 1, Grade 1, polyvinyl chloride (PVC), threaded at both ends, and conforming to ASTM D1784 -85. Nipples shall be uniformly gray.

D. Fittings for Recycled Pipe:

1. Fittings shall meet the standards outlined in Sections 2.09, A, B and C above, unless otherwise noted in the City of Roseville Design and Construction Standards for recycled water, latest edition.

2.09 Swing Joints
A. Swings joints shall be as shown in the City Parks Construction Standard detail.

Schedule 40 threaded PVC triple swing joints or an accepted equal.

2.10 Electric Remote Control Valve
A. Sizes as shown on the Plans. All valves shall be Rainbird PEB series or accepted equal and shall contain the following:

1. a globe-type electric remote control, normally closed diaphragm type with slow opening and closing action,

2. encapsulated solenoid type actuation,

3. a minimum rating of twenty-four (24) volts,

4. sixty (60) cycle,

5. two to five (2-5) watts,

6. a manual flow adjustment with shut-off provisions,

7. provisions for an external “bleed” of the diaphragm chamber for manual operation.

8. a ball valve on the inlet.

9. Schedule 80 PVC threaded fittings from main line to valve.

B. Valve boxes shall be rectangular, rigid plastic valve boxes with lockable lids and extensions by Carson Industries, LLC or accepted equal. Valve box shall be sized appropriately to house entire valve assembly with space to accommodate maintenance access. Valves for drip zones require Jumbo size boxes.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1161 of 1714 ends

JM-52 Park
October 2025
Section 32 84 00: Irrigation System

Page 6 of 18 ends

1. Boxes shall be colored green in potable applications, and purple for recycled water applications.

2. Valve boxes used on recycled water systems shall be permanently colored purple through the manufacturer. Boxes painted purple will be rejected.

3. Label lids using heat branded identification, T:Turf, S:Shrubs, B:Bubblers C. Controller station identification number shall be standard yellow tags with permanent numbers by Christy or accepted equal.

2.11 Root Watering System
A. Provide pre-manufactured root watering system.

1. Pressure compensating bubbler. See irrigation sheets for flow rates.

2. Check valve where applicable to prevent low head drainage.

3. Swing joint assembly

4. Locking grate top on semi-rigid mesh tube. Use purple grate for Recycled water systems

5. Filter fabric sleeve

2.12 Irrigation Heads
A. All irrigation heads shall conform to type, size, precipitation rate, gallons per minute discharge, pressure and throw radius as shown on the Plans, unless otherwise accepted in writing.

B. In all available models, all irrigation heads shall have stainless steel risers, unless otherwise approved in writing.

C. For recycled water applications, irrigation heads shall be colored purple, have debris pocket, and wiper seals with 3 touch points.

D. Irrigation heads shall have built-in pressure regulation for pop up sprays and/or water-efficient heads.

E. Include built-in check valve where applicable to prevent low head drainage.

2.13 Drip Irrigation
A. Sub-surface dripline.

1. Flexible polyethylene tubing shall have factory-installed pressurecompensating, inline emitters spaced evenly per listed spacing.

2. Emitter shall incorporate elemental or ionic copper root intrusion prevention technology, and shall be warranted by the manufacturer to be free of emitter plugging due to root intrusion for a period of fifteen (15) years minimum.

3. Emitter shall have a built-in check valve that will hold back, at minimum, an

8.5' column of water.

4. Dripline for use with recycled water systems shall be properly and permanently marked for non-potable use.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1162 of 1714 ends

JM-52 Park
October 2025
Section 32 84 00: Irrigation System

Page 7 of 18 ends

5. Acceptable products include Rainbird XFS-CV Series or Netafim Techline HCVXR Series, or approved equal.

B. All fittings shall be constructed of injection molded, brown plastic having a nominal outside dimension of 17mm (0.56”). Female and male threaded ends shall be capable of mating to standard PVC pipe with tapered threads.

C. Line flushing valve

1. Valve shall be schedule 40 PVC ball valve with brass hose thread adapter.

2. Valve box shall be rigid plastic, with lockable cover by Carson Industries, LLC or accepted equal. Boxes shall be colored green in potable applications, and purple for recycled water applications.

3. Drip system operation indicator shall be Rainbird 1812 Pop-up spray body with 4-VAN nozzle set to 0-degree pattern, with Rainbird SA-125050 swing assembly and XFF-TFA barbed bt ½” FIPT fitting, or accepted equal.

D. Pressure Regulating Filters shall be Rainbird PRB Pressure Regulating Basket Filter, or approved equal, and shall include: Basket style body and jar-top cap constructed of heavy-duty glass-filled, UV-resistant polypropylene, with 150 PSI (10,3 bar) operating pressure rating. Standard 200 mesh (75 micron) filter screen constructed of stainless steel attached to propylene frame. Normallyopen in-line pressure regulating device, constructed of durable, UV resistant non-corrosive material able to accommodate an inlet pressure rating of not less than 150 PSI (10,3 bar), with preset outlet pressure of approximately 40 PSI (2,8 bar).

2.14 Thrust Blocks
A. All thrust blocks shall be concrete. The size of the blocks shall be determined by the average safe soil-bearing load of 700 lbs. per square foot.

B. Polyethylene sheeting at thrust blocks shall be 6mil.

2.15 Quick Coupler Valves
A. For potable water, quick coupling valves shall be Rainbird #44LRC or accepted equal. For recycled water, quick coupling valves shall be Rainbird #44NP lockable or accepted equal. All quick coupling valves shall be:

1. brass or bronze with one (1) IPS female pipe connection,

2. two piece body with a removable upper portion (for replacement), and

3. durable yellow covers for potable and purple for recycled.

B. Valve keys shall be brass or bronze and shall be of the same manufacturer and size as the valve.

C. Valve box shall be rigid plastic, a minimum of ten inches (10”) in diameter with lockable cover by Carson Industries, LLC or accepted equal. Boxes shall be colored green in potable applications, and purple for recycled water applications.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1163 of 1714 ends

JM-52 Park
October 2025
Section 32 84 00: Irrigation System

Page 8 of 18 ends

D. Where recycled water is used, conform to the City of Roseville Design and Construction Standards.

2.16 Manual Valves
A. For pipe four inches (4”) and larger gate valves shall be:

1. located where shown on the Plans,

2. flanged with Class 125 cast iron body,

3. bronze trimmed with a non-rising stem,

4. square operating nut,

5. able to withstand a cold water pressure of 150 pounds per square inch, and

6. sized to match the pipeline which the valves serve, unless otherwise shown on the Plans.

B. For pipe three inches (3”) or smaller

1. located where shown on plans

2. lead free

3. Able to withstand cold water pressure of 300 pounds per square inch

4. sized to match the pipeline which the valves serve, unless otherwise shown on the Plans.

5. Nibco T-113-LF or approved equal.

C. Pipes which feed directly into a remote control valve, ball valves shall be installed and shall:

1. allow for manual operations,

2. rapid on/off , drip-tight shut-off control,

3. be constructed of bronze or brass with heavy-duty handle,

4. operate up to 22 gallons per minute,

5. operate between 15 and 150 pounds per square inch, and

6. be sized to match the pipeline which the valves serve, unless otherwise shown on the Plans.

D. Valve box shall be rigid plastic, a minimum of ten inches (10”) in diameter with extensions and lockable cover by Carson Industries, LLC, as shown on the Plans or accepted equal. Boxes shall be colored green in potable applications, and purple for recycled water applications.

2.17 Automatic Irrigation Controller
A. Automatic controllers shall be Calsense CS3000 or accepted equal. Each controller shall include:

1. CS3-## – Calsense (##) Station Base Model,

2. FM-2U – Flow Meter (Ultrasonic),

3. -S1– Stainless Steel Enclosure with 1 hole for Stubby Antenna.

4. CS3000 Transient Protection

5. TP-110 – AC Line Protection,

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1164 of 1714 ends

JM-52 Park
October 2025
Section 32 84 00: Irrigation System

Page 9 of 18 ends

6. GR-STUBBY – Antennae w/2ft cable

7. On/Off Switch

8. GFI electrical outlet inside enclosure.

When multiple controllers are used, include:

1. CS3-FL – Flowsense software (for multiple controllers sharing POC and/or communications)

2. CS3-MSSE-KIT or CS3-SR-KIT – Hardwire or SR radio,
When multiple flow sensors are used, include:

11. CS3-2WIRE-OPT & CS-2W-POC (one per POC) – Additional Flow Meter interface.

B. Third-Party Communications hardware required:

1. Sierra Wireless AirLink RV55 LTE-A PRO Router (#1104303)

2. Router AC Adapter (#2000579)

3. AT-5 (or higher) Ethernet Cable - 1ft (#A3L781-01-BLU) C. Communication wire between controllers, when required, shall be Paige Cable P7171D or accepted equal.

2.18 Control Wires
A. Direct burial solid copper wire AWG-U.F. 600 volt.

B. Common wire and two spare wires shall be minimum #12-gauge.

C. Pilot wires shall be red, minimum #14-gauge. Wire gauge shall be, at minimum:

Wire Gauge #14 #12 #10 #8
Max. Distance (ft.) 2,500 3,250 4,000 4,800
D. Splices:

1. Wire connections at remote control valves only shall utilize 3M direct bury splice kit model #DBY (yellow) or model #DBR (red).

2. All other splices, including line splices, connections to flow meters and othersensors,shallutilize 3M Scotchcast 3570G Connector Sealing Packs, no known equal.

E. Wiring colors shall be:

USE COLOR
Flow Yellow
Master Blue
Pump Black
Valves Red
Common White
Spare Orange
Tracer Green

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1165 of 1714 ends

JM-52 Park
October 2025
Section 32 84 00: Irrigation System

Page 10 of 18 ends

2.19 Sleeves
A. Schedule 40 PVC 1120-1220 and two times the diameter of the pipe to be accommodated by the sleeve, one (1) for control wires and one (1) for main line, and one (1) for lateral lines.

B. Maximum one (1) line per sleeve.

C. Add one (1) spare, same size as largest.

2.20 Tracer Wire
A. Insulated solid copper wire, minimum #12 gauge. Color shall be green.

PART 3 - EXECUTION

3.01 Site Conditions
A. Prior to start of irrigation work, review the site conditions to verify that stub- outs, points of connections, sizes of the points of connections, water pressure and other essential items necessary for irrigation work to commence are as shown on the Plans and as indicated in the Specifications.

B. Notify the Inspector immediately of any existing conditions which are unacceptable for the commencement of irrigation work.

3.02 Coordination of Work
A. Coordinate all work with other trades.

B. The irrigation plan is diagrammatic. Whenever possible, locate all pipes in planted or turf areas. Do not scale off of the Plans. Where field conditions have changed, notify the Inspector immediately.

3.03 Excavation and Trenching
A. Trenches shall be dug straight and in such a manner as to completely support the pipe continuously along the bottom of the trench. In rocky conditions, overexcavation and placement of clean bedding material may be required to ensure protruding rocks do not place undue stress on pipes. Trench layout shall follow that shown on the Plans, except where accepted by the City.

B. The following minimum cover shall be provided for pipe:

Pipe Type Minimum Cover
Pressurized Mainlines 24”
Non- Pressurized Lateral Lines 18”
Domestic Water Lines 24”
Control wires 24”
PVC Sleeves under Paving 18”
PVC Sleeves under Auto X-ings 24”
C. Install detection wire, looped in and out of valve boxes and attached to all irrigation mainlines.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1166 of 1714 ends

JM-52 Park
October 2025
Section 32 84 00: Irrigation System

Page 11 of 18 ends

D. High voltage wires shall not be installed in the same irrigation water line trench.

3.04 Testing and Flushing
A. Pressure Testing shall occur only when the following conditions can be fulfilled:

Item Description Condition
Quick coupler valves Installed and capped
Electric remote control valves Installed
Flow valve Installed and open
Ball/Gate valves Installed and open
Lateral lines Disconnected
Welded PVC joints Cured at least 24 hours
Pipe Center loaded with backfill
Concrete Thrust Blocks Installed and cured at least 48 hours Couplings and fittings Exposed
Detection wire Installed
B. A pressure gauge shall be installed at the lowest point of the line. Continuous pressure shall be applied at a rate of 125 psi for all mainlines. The pressure shall remain stable for a minimum of two hours with no detectable leakage.

Upon completion of the test, a complete examination of the line shall be conducted by the City. Leaks resulting from the test shall be repaired and the line shall be re-tested. This process shall be repeated until the line passes the leakage test.

C. All lines and risers shall be flushed prior to final installation of irrigation heads.

All control valves shall be left open during the flushing process.

3.05 Backfilling and Compacting
A. Backfilling of trenches shall not occur until all tests and reviews have been performed. See inspection record contained in the Parks Construction Standards, latest edition. Any trench that is prematurely backfilled may be required to be re-dug for review.

B. Compaction of the trenched areas shall meet the following compaction rates of 95% in areas to receive paving and 85% in areas to be planted.

C. Do not flood trenches unless otherwise accepted by the City.

D. Sunken trenches shall be re-finished flush with the adjacent grades.

3.06 Backflow Prevention Device and Enclosure
A. Install per local codes and manufacturer’s instructions.

B. When the flow meter is installed above grade, install a backflow prevention device enclosure with lockable gate.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1167 of 1714 ends

JM-52 Park
October 2025
Section 32 84 00: Irrigation System

Page 12 of 18 ends

3.07 Flow Meter Installation
A. Install per local codes and manufacturer’s instructions.

B. All flow meters shall be installed in ground.

C. Install 3/4" conduit from irrigation controller to flow meter valve box. Install a pull box every 100’.

D. Valve box lids shall be permanently marked identifying FM for flow meter and MV for master valve and GR for grounding rod with heat branding using stencils in a uniform location on all boxes throughout.

3.08 Pipe Installation
A. Install irrigation pipe in planted areas whenever possible.

B. All pipe and fittings shall be cleaned and free from dirt, dust and moisture.

C. Pipe may be assembled along the trench at grade to avoid undue strain on the pipe or the fittings. All solvent weld connections shall be primed before applying glue. Snake the pipe within the trench to compensate for expansion and contraction.

D. All PVC pipe and metal valve connections shall be made with threaded fittings consistent with drawings PK-15 and PK-16 of the City of Roseville Parks Construction Standards.

E. All PVC-to-PVC threaded connections shall be made with Teflon tape.

F. Install concrete thrust blocks in locations where rubber gasketed irrigation mainlines change directions, e.g. ells, tees; as required on other lines and fittings; and at the termination point of the mainline. Do not conduct a pressure test within 48 hours of the thrust block pours. The size of the thrust blocks shall be per manufacturer’s instructions and shall be adequate in size to absorb thrusts up to the maximum internal water pressure. Refer to 3.18 Thrust Blocks.

G. Use glued fittings for all connections inside of a sleeve and within 20’ of a sleeve.

H. When multiple pipes are in the same trench, provide a minimum 2” horizontal separation between pipes, or equal to diameter of pipe, whichever is larger. Do not stack pipes vertically.

3.09 Electric Remote Control Valves
A. Install per local codes, manufacturer’s instructions, City of Roseville Design and Construction Standards and as shown on the Plans.

B. Install one (1) electric remote control valve per box and whenever possible, group valve boxes together. Align boxes in a straight and neat row and flush to finish grade. Provide a minimum of six (6) inches between boxes.

C. All valves shall be tagged for easy identification of valve number. Valve box lids shall be permanently marked identifying valve number and controller letter with heat branding using stencils in a uniform location on all boxes throughout.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1168 of 1714 ends

JM-52 Park
October 2025
Section 32 84 00: Irrigation System

Page 13 of 18 ends

D. Each valve shall be separately saddle tapped. Manifolded valves shall be rejected.

E. Locate valve boxes outside of turf areas, adjacent to paving, i.e. sidewalks, hardscape, etc. except where shown on the Plans.

F. Provide a minimum of eighteen (18) inches of a complete set of spare control wires, looped, within all control valve boxes.

3.10 Irrigation Heads
A. Install all heads where shown on the Plans and as specified herein.

B. Turf rotary pop-up heads shall be placed two (2) inches from any edge of adjacent walkway, concrete mow band, concrete curb, header board or other hardscape edging, or as required by current WELO regulations.

C. Rotary pop-up heads shall be installed flush with the top of finish grades of turf or planting areas.

D. Sprinkler head riser nipples sizes shall match or be the same as the riser opening of the sprinkler body.

E. Install sprinkler heads with internal check valves where heads are located in low drainage areas, i.e. bottom of berms, bottom of drainage swales, toe of slopes, etc.

F. Install all heads perpendicular to ground surface with an offset from the edge of pavement as indicated in the details.

3.11 Drip Irrigation
A. Drip irrigation is to be installed in a grid pattern layout of equal spacing between rows, unless otherwise noted on approved plans.

B. All drip irrigation shall be installed sub-surface, per manufacturer’s specifications. Staple all tubing to soil at 5 feet on-center spacing prior to backfilling.

C. Drip line shall be installed prior to plant installation, with the exception of 15- gallon and larger plant container sizes, which may be installed first at the discretion of the contractor.

D. Line Flushing Valves are to be installed below grade, as detailed, in a valve box with bolt-down lid to allow for periodic inspection and flushing.

1. Minimum of One (1) Line Flushing Valve shall be installed for every fifteen (15) GPM of zone flow, and at every termination point within a zone, and shall be installed at a point farthest away from the source (typically on an exhaust header) as possible.

E. Pop-up drip system operation indicators shall be placed within eighteen inches (18”) of each Flush Valve and shall not be placed such that it will be obstructed by vegetation. Place minimum twelve (12) inches from adjacent hardscapes.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1169 of 1714 ends

JM-52 Park
October 2025
Section 32 84 00: Irrigation System

Page 14 of 18 ends

F. If required, Air/Vacuum Relief Valves shall be installed below grade in valve boxes to allow for periodic inspection.

G. Valve box lids shall be permanently marked identifying LF for Line Flush valve and AR for Air/vacuum Relief with heat branding using stencils in a uniform location on all boxes throughout.

3.12 Quick Coupler and Gate Valves
A. Install per local codes and manufacturer’s instructions.

B. Locate valve boxes flush with finish grade, twelve (12) inches from walkways, curbs, header boards, etc., and within planted area whenever possible.

C. Install one (1) valve per box.

D. For quick coupler valves, install at 100 feet on center to the extent possible.

Provide a 24” steel support staked adjacent to the riser using two (2) stainless steel clamps.

E. For gate valves, install at locations indicated on the Plans.

F. For valve boxes installed below grade, provide 3M ball markers.

G. Valve box lids shall be permanently marked identifying GV for gate valve and QC for quick couplers, and SB for splice boxes with heat branding using stencils in a uniform location on all boxes throughout.

3.13 Automatic Controller
A. Install per local codes and manufacturer’s instructions within the specified enclosure.

B. Provide single Paige Cable P-7171D installed in conduit between all controllers.

C. Provide all necessary wiring for a complete installation between the controller and the valves.

D. Above grade wiring shall be installed in metal conduit, unless otherwise accepted. Securely mount conduit onto enclosure or wall and paint to match the adjacent surface.

E. Provide a grounding rod and bonding for each enclosure as required for lightning protection. Grounding rod shall be consistent with drawing PK-1 of the City of Roseville Parks Construction Standards. Install separate grounding rods for each enclosure where bonding is impractical.

F. Label each controller, using permanent markings, with the letter identification indicated on the Plans. Affix label on the inside of the controller cabinet door.

G. Install 110V outlet (GFIC) inside controller enclosure.

H. Provide two (2) reduced as-built irrigation diagrams, laminated and colorcoded indicating controller letter, valve/station numbers, valve size, operating pressure, gallons per minute and type of planting for each valve. See Section 01 10 00: Summary of Work 1.15B.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1170 of 1714 ends

JM-52 Park
October 2025
Section 32 84 00: Irrigation System

Page 15 of 18 ends

I. Ground test to be conducted after installation. Test results shall not exceed 25 ohms.

3.14 Control Wires
A. Wherever possible, install control wires in common trenches with mainline. The wires shall be taped in bundles at ten (10) feet on center and laid to the side of the pipe. Provide slack between ties to allow for contraction.

B. Wire valve to controller as shown on the plans.

C. Where runs are long, provide an extra three (3) feet of extra common and control wires looped at 200’ intervals. Snake wires within trenches to allow for contraction.

D. Line splices shall occur in valve boxes at grade, label and allowed only on lengths greater than 2500’. Show locations on as-built plans.

E. Do not wrap wire around pipe or allow any wiring to be placed in concrete or concrete thrust blocks.

F. Install two (2) spare wires starting from the controller, looped to each valve box to the furthest valve box, without splices.

3.15 Tracer Wire
A. Install tracer wire on top of the mainline.

B. Provide a twelve-inch (12”) loop in and out of each valve box. Solder all splices.

C. Where potable water lines are placed in a separate trench, install a tracer wire on top of the potable water line per City of Roseville Design and Construction Standards
D. Tracer wire shall be tested during review and pressure test of the mainline.

3.16 Sleeves
A. Install sleeves under all pavement and as shown on the Plans.

B. Install sleeves at the depths indicated in Section 3.03B above.

C. Extend sleeves a minimum of twelve (12) inches beyond the edge of pavement.

D. At every sleeve location installed in roadways, provide a spare PVC sleeve capped at each end and marked with a 3M ball marker.

3.17 Thrust Blocks
A. Install polyethylene sheeting between mainline and concrete.

B. Thrust blocks shall be formed against a solid trench wall. The thrust block cavity shall be in undisturbed soil or previously placed compacted backfill that yields an acceptable allowable bearing pressure.

C. Concrete thrust blocks shall not be poured on valve wires.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1171 of 1714 ends

JM-52 Park
October 2025
Section 32 84 00: Irrigation System

Page 16 of 18 ends

3.18 Cross Connection Testing for Recycled Water Systems A. The Recycled Water System shall be tested for cross connection in accordance with Uniform Plumbing Code Appendix J prior to use.

B. All testing of Recycled Water Systems must be performed utilizing a potable water source via a construction water connection per City of Roseville Construction Standards. No Recycled Water may enter a Recycled Water System until all testing is successfully completed.

C. At the time a cross connection test is to be performed, construction on both the Potable and Recycled Water Systems being tested must be complete and both systems fully operational and functioning as designed.

D. Cross connection testing shall be performed in the system by City forces with the assistance of the contractor. The test must be coordinated through the Parks Department Inspector. Allow one week’s notice to schedule the crossconnection test. Depending on complexity of the site, a preliminary field meet may be required.

3.19 Coverage Test
A. Prior to planting, the Contractor shall perform a coverage test to confirm that water coverage is complete and adequate, and produces no overspray onto hardscapes. Irrigation pressure readings at the head or emission device may also be taken as part of the coverage test to confirm adequate system hydraulics.

B. The coverage test shall be performed on the entire irrigation system and shall be performed in the presence of the Parks Inspector. The irrigation system must be connected to the City water system through the water meter.

Temporary connections are not allowed. On recycled water systems, the coverage test shall take place only after successful completion of the crossconnection test, with the recycled water meter in place.

C. On Park projects containing turf, a comprehensive survey of the Distribution Uniformity (Low Quarter) of each irrigation zone containing turf shall be performed by a third-party, Certified Landscape Irrigation Auditor prior to planting of turf. The irrigation system must be 100% complete, including functionality of the irrigation controller and booster pump, if present. The irrigation auditor shall prepare and submit a report listing each zone’s Distribution Uniformity, including actual mapping data of individual catch cans recorded on irrigation plan sheets, and noting any potential deficiencies in the system leading to any inadequate findings. Reported deficiencies in Distribution Uniformity will be evaluated by the Project Manager and may require corrective measures prior to approval of turf planting. Deficiencies caused by improper installation shall be corrected at no additional cost to City.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1172 of 1714 ends

JM-52 Park
October 2025
Section 32 84 00: Irrigation System

Page 17 of 18 ends

3.20 Irrigation Audit
A. A landscape irrigation audit shall be performed after all landscape and irrigation is installed. The irrigation system must be 100% complete, including functionality of the irrigation controller and booster pump, if present.

B. All landscape irrigation audits shall be conducted by a third party certified landscape irrigation auditor. Landscape audits shall not be conducted by the person who designed the landscape or installed the landscape.

C. The water audit shall conform to the specific water audit requirements of the City of Roseville Environmental Utilities Department, and any supplemental requirements from the City of Roseville Parks, Recreation & Libraries Department. The contractor shall submit a comprehensive landscape irrigation audit. This shall include, but is not limited to:

1. A completed Irrigation Audit Report-(City of Roseville provided forms only)

2. Complete system evaluation, including site conditions, system and flow data.

3. Scheduling parameters used to set the irrigation controller.

4. An Irrigation schedule for the landscape provided to the owner.

D. A minimum of 25% of all zones shall be audited. The 25% minimum shall be a representative sample of each irrigation method present (i.e. Rotors, bubblers, rotary nozzles, drip, etc.), and is in addition to any turf zones audited during the coverage test.

E. Any deficiencies noted in the audit report such as, but not limited to, run-off, overspray, obstruction of spray patterns, etc., shall be corrected and signed off as such by the original irrigation auditor prior to submission of the report. Do not submit audit reports with uncorrected deficiencies.

3.21 Clean Up
A. Each phase of work shall be immediately cleaned up. Excess equipment, material, etc., shall be legally disposed of and removed from site. All concrete, asphalt and/or decomposed granite paving shall be kept free of soil. Damage to such surfaces shall be immediately repaired to the satisfaction of the City.

PART 4 - GUARANTEE

4.01 General
A. Contractor shall provide a written guarantee covering all materials, equipment and workmanship furnished by him to be free of all defects after installation is accepted, including all defective parts that may have been found.

B. All paved areas shall be swept clean and planted areas shall be weed-free.

C. All irrigation heads shall be properly adjusted. Debris and refuse shall be removed from site prior to inspection.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1173 of 1714 ends

JM-52 Park
October 2025
Section 32 84 00: Irrigation System

Page 18 of 18 ends

4.02 Pre-Final (Punch List) Review
A. See Section 01 10 00 1.16 - Summary of Work for notification process.

4.03 Establishment
A. Full automated utilization of the irrigation system shall be included as part of the maintenance of the project. See Section 329000: Planting for additional information.

B. Program and utilize the establishment schedule as submitted with the turn-in items.

C. Contractor to run the system in “quantity” mode or “time plus flow” for a minimum of one (1) week.

D. Check the irrigation system weekly to ensure proper operations. Make all necessary adjustments, including watering schedule to ensure proper and healthy plant growth. At no time shall pools of water be present within any part of the project. Conversely, at no point shall dry or under-watered spots be visible upon inspection. Improper irrigation management resulting in flooding or dry conditions to the detriment of plant material may constitute an extension of the establishment period, at no additional cost to the City.

4.04 Final Review
A. The Contractor shall demonstrate to the City, valve by valve, the entire irrigation system to be operable. All heads shall be adjusted/flushed and all drip zones shall be flushed prior to the on-site review. Any item requiring adjustments shall be completed immediately and to the satisfaction of the City.

B. Provide necessary training to City staff in the proper operations and maintenance of the booster pump.

C. The date of final acceptance by the City Council or the recordation of the property transfer shall signify the start date of the warranty period. Final acceptance shall include the project in total and will not segregate any specific item or trade included in the construction of the project.

END OF SECTION

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1174 of 1714 ends

JM-52 Park
October 2025
Section 32 90 00: Planting

Page 1 of 11 ends

SECTION 32 90 00

PLANTING
PART 1 - GENERAL

1.01 General Requirements
A. The requirements set forth in the General Conditions shall be in addition to the standards provided herein.

B. The requirements set forth in the Supplemental Conditions shall be in addition to the standards provided herein.

1.02 Description
A. Furnish all labor, materials and equipment for the complete installation of landscape items, including all trees, shrubs, groundcovers and turf; maintenance for the establishment of new plant materials; and all necessary appurtenances for proper planting, noted or implied, as shown on the Plans and as specified herein.

1.03 Related Work
A. Section 31 20 00: Earthwork
B. Section 32 84 00: Irrigation System

1.04 Quality Assurance
A. Provide an experienced foreman who shall directly supervise the work force during all work to be performed under this contract. The foreman shall be present during the time when work is to be performed.

B. Plant material shall conform to current “American Standards for Nursery Stock” and the State of California Grading Code of Nursery Stock, No. 1 grade. Use only nursery-grown stock.

C. All plant material shall be certified free of plant diseases and insect infestations from the County Agricultural Commissioner as required by law. Each shipment of plant material shall be required to have clearance certificates.

D. Prior to planting, a soils fertility test/analysis shall be conducted by an accepted and qualified testing laboratory. Test results shall contain existing nutrient levels, soil texture, cation exchange capacity, soluble salts, pH levels, infiltration rates and recommended soil amendments/fertilizers to ensure proper growth of the specified plantings.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1175 of 1714 ends

JM-52 Park
October 2025
Section 32 90 00: Planting

Page 2 of 11 ends

1.05 Submittals
A. Submittals for specified items are not required; however, submittals are required for any proposed substitutions or deviations from the Plans or Specifications. Additionally, submittals are required for the specific items listed below. The Contractor shall submit a materials summary sheet indicating which items will be installed as specified and which items are proposed for substitutions. The Contractor shall submit proof of order within ten (10) working days of the Notice to Proceed, indicating all specified materials have been ordered, noting “as specified” or “substitution proposed”. Submittals are required on the following items:

1. Bark mulch material,

2. Certificates of compliance for turf seed mix, soil amendments, fertilizers and hydroseed mix,

3. Sod-grown turf,

4. Soils test with soil amendment recommendations.

5. Trees
a) Submit for approval, plant sources including the names of nurseries proposed as sources of acceptable trees, and a list of the trees they will provide. The plant list shall include the botanical and common name and the size at the time of selection, including basal caliper and height. b) Submit all requests for substitutions of plant species or size for approval.

Request for substitution shall be accompanied with a list of nurseries contacted in the search for the required plant and a record of other attempts to locate the required material. Requests shall also include sources of plants found that may be of a smaller or larger size, or a different shape or habit than specified, or plants of the same genus and species but different cultivar origin, or which may otherwise not meet the requirements of the specifications, but which may be available for substitution.

1.06 Soil Testing
A. Native soil and in-place topsoil shall be tested for amendment determination.

Soil Tests shall include soil texture, macro nutrients, micro nutrients, lime, base saturation, pH, sodium, boron, salinity, Cation Exchange Capacity (CEC), and Organic content.

B. Submit soils report for review and approval after completion of grading operations. Soil Testing shall be performed by an agriculture-based lab, with detailed, written recommendations for soil amendments and fertilizers specific to ornamental landscape plants and turf.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1176 of 1714 ends

JM-52 Park
October 2025
Section 32 90 00: Planting

Page 3 of 11 ends

1.07 Product Delivery, Handling and Storage
A. All materials shall be delivered bearing nursery label with botanical, common names, including cultivars.

B. Carefully handle plant material to ensure that limbs are not broken during the planting or storage of the material.

C. Store plant material in a covered area on-site, protected from inclement or hot weather on-site. Keep root balls moist by frequent watering (during hot weather) of all accepted stock until such time as planting occurs.

1.08 Inspection of Plant Material
A. Notify the Project Manager a minimum of 48 hours prior to date of delivery. All plant material is subject to inspection at the time of delivery. A sample number of plants will be inspected for the following items:

If the sample.... then the plant shall be...
is healthy, shapely and well rooted accepted.
bears a strong central leader accepted.
is wilted, wind-blown or sunburned rejected.
is root-bound, restricted or deformed rejected.
does not bear a strong central leader or
has been severely pruned back
rejected.

B. Stock to be consistent with CALFIRE Nursery/Tree Quality Cue card and Root Management Cue Card. Inspector may require contractor to remove tree or plant stock from plant containers to examine roots.

C. 15 gal tree needs to have at least 1” in basal caliper, a 24” box tree needs to have at least 2” in basal caliper, a 36” box tree needs to have at least 3” in basal caliper. Basal caliper is measured as 6” above the ground.

D. Based on the sample inspection, the Project Manager or Inspector reserves the right to reject any or all of the plant material delivered. All rejected plant material shall be immediately disposed of off-site.

1.09 Record Drawings
A. The Contractor shall keep an accurate record of the as-built conditions of the landscaping. These records shall be updated daily and kept at the construction site. At any time, the Inspector may examine the conditions of the “as-builts” to ensure compliance of the above.

PART 2 - PRODUCTS

2.01 Plants
A. The material to be planted shall conform to that indicated on the plans, unless otherwise accepted. The quantity shown on the Plans is approximate and is

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1177 of 1714 ends

JM-52 Park
October 2025
Section 32 90 00: Planting

Page 4 of 11 ends

furnished for convenience only. Verify all quantities prior to ordering plant material.

2.02 Turf
A. Turf shall be seed or sod (see Scope of Work Plan for Add Alternates).

B. Seed –

1. 98% pure, weed-free mixture with a minimum of 95% germination. Deliver on-site unopened and in the original containers.

2. 100% Turf Saver RTF (Rhizomatous Tall Fescue) by Barenbrug or accepted equal.

3. Turf seed mix shall be Blue tag certified.

C. Sod – Tall fescue blend with named, improved turf-type varieties only. Blend shall contain a minimum 25% Lateral Spread, Rhizomatous, or Self-Repair type tall fescue. Sod shall be non-netted, and contain no more than 10% Bluegrass.

D. Seed / Sod must be submitted and accepted by the Project Manager prior to ordering.

2.03 Soil Amendment
A. As recommended by soils test report.

2.04 Mulch
A. Regular “Walk-on” fir bark as manufactured by Redi-Gro Corporation, Sacramento, CA (916) 381-6063, Mallard Creek, Inc, Rocklin, CA (916) 645- 1681, My Bark Company, Inc., Linden, CA (209) 649-4250 or accepted equal.

B. Decorative bark, shredded lumber or saw dust, and construction debris are not permitted. The mulch must be free of needles.

2.05 Topsoil
A. Stockpiled, on-site material.

B. Imported topsoil shall be natural, friable, well-draining, free from admixture of subsoil and foreign objects larger than one inch (1”) in diameter, free from toxins or any other harmful substance which may deter healthy plant growth.

C. Perform a soils test for all imported soil. Soil test shall comply with Section 1.06.

Submit soils report for review and approval prior to import activities.

2.06 Pre- and Post- Emergent Herbicide
A. Clean, and non-staining. Consult with a pesticide specialist.

2.07 Tree Stakes and Ties
A. Trees furnished in #15 nursery containers require 2” diameter stakes. Trees less than 8' in height require an 8' stake; trees 8' or greater in height require a 10' stake. Stakes shall be pine or Douglas fir (pressure or non-pressure treated).

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1178 of 1714 ends

JM-52 Park
October 2025
Section 32 90 00: Planting

Page 5 of 11 ends

B. Trees furnished in 24” boxes or larger require 3” diameter by 10’ long stakes.

Stakes shall be, pine or Douglas fir (pressure or non-pressure treated).

C. Tree ties and Tree Guying shall be Super Tree Tie, bursting strength 300psi, tensile strength 300lbs , 1” vinyl impregnated Nylon, waterproof, Manufactured by: Arthur Enterprises. Cut to length. Color to be Green.

2.08 Native Seed
A. Where required, native seed shall be applied as follows:

1. Upland areas
Elymus glaucus (Blue Wildrye) 10.0 lbs/acre
Nassella pulchra (Purple Needlegrass) 9.0 lbs/acre
Nassella cernua (Nodding Needlegrass) 6.0 lbs/acre
Melica caljfornica (Californiameljc) 3.0 lbs/acre
Vulpia microstachys (Small Fescue) 3.0 lbs/acre
Poa secunda (Native Pine Bluegrass) 3.0 lbs/acre
Bromus carinaws (California Brome) 2.0 lbs/acre

2. Wildflowers (addition to seed mix(es) above, if specified) Clarkia amoena (Farewell to Spring) 0.5 lbs/acre
Eschscholzia caljfornica (California Poppy) 2.0 lbs/acre Lupinus nanus {Sky Lupine) 3.5 lbs/acre
Nemophila menziesii (Baby Blue Eyes) 1.5 lbs/acre
Lasthenia californica (Common Goldfields) 1.5 lbs/acre
B. Areas with sandy, dry soil shall receive: Zorro Annual Fescue 6 lbs/acre, Rose Clover 9 lbs/acre
C. A fertilizer consisting of 15-15-15 shall be applied at a rate of one half pound per 1,000 square feet. Fertilizer shall be Natural-based, slow release, and balanced in N, P, & K.

D. Seed for creek banks shall conform to the latest requirements of the California Department of Fish and Game.

PART 3 - EXECUTION

3.01 Site Preparations
A. Prior to start of landscaping work, review the site conditions to verify final grades have been established, plant/turf beds are weed free, and the irrigation system is operational as shown on the Plans and as indicated in the Specifications.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1179 of 1714 ends

JM-52 Park
October 2025
Section 32 90 00: Planting

Page 6 of 11 ends

B. For landscaping within all street right-of-ways, conduct a soils analysis test of the existing soils and remove all lime-treated soils, aggregate base or other non-organic material to a minimum depth of two feet before planting or irrigation installation. Import topsoil to bring the finish grade to specified grades. Submit the soils analysis test results of the imported material prior to import.

C. Notify the Inspector immediately of any existing conditions which are unacceptable for the commencement of landscaping work.

3.02 Coordination of Work
A. Coordinate all work with other trades.

3.03 Preparation of Planting and Turf Areas
A. Upon completion of grading and underground activity, Contractor shall obtain a soils test as outlined in 1.06.

B. Place stockpiled topsoil in all areas to receive planting or turf to a minimum depth of twelve inches (12”).

C. Rip topsoil surface in two directions to a minimum depth of twelve inches (12”).

D. Spread soil amendments at the rates indicated in the soils report.

E. Rototill amendments to recommended depths. Till amendments to a depth of 6” or as recommended by soils report.

F. Remove all rock and debris which are greater than ½ inch in areas to receive turf and one inch (1”) in areas to be planted.

G. All planted and turf areas to be smooth and uniform in grade as shown on the Plans.

H. Planting areas to be sloped to drain as shown on the Plans.

3.04 Storage of Plants and Trees
A. Protect materials from deterioration during delivery and storage. Adequately protect plants from drying out, exposure of roots to sun, wind or extremes of heat and cold temperatures. If planting is delayed more than 24 hours after delivery, set plants in a location protected from sun and wind. Provide adequate water to the root ball package during the shipping and storage period, including weekends and Holidays.

B. Soil moisture shall be maintained above wilting point and below field capacity for the root ball substrate or soil.

C. All plant materials must be available for observation prior to planting. Any plants determined to damaged or distressed due to improper watering may be rejected by inspector and shall be replaced at no cost to City.

3.05 Plant Installation
A. Tree and Shrub Planting

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1180 of 1714 ends

JM-52 Park
October 2025
Section 32 90 00: Planting

Page 7 of 11 ends

1. Remove only those plants which will be planted the same day. Place such plants in the proposed locations for review and accepted by the City prior to actual planting. Notify the Inspector a minimum of 48 hours prior to day of planting.

2. Dig planting pits as shown on the Plans and as shown in the Parks Construction Standards. Scarify the sides and bottom of pit to prevent glazing. Fill pit completely with water and allow the water to completely drain from the pit prior to actual planting.

3. Relocate any plantings taller than 6” in height that fall in front of any irrigation head in order to ensure proper coverage of the irrigation system.

4. For pits that retain water, completely penetrate the hardpan layer at the bottom of the pit and backfill with topsoil. Fill pit with water to test and ensure proper drainage.

5. Prior to tree planting a central leader needs to be established by structural pruning, as necessary. Codominant leaders need to be removed or suppressed by structural pruning. Refer to the CALFIRE "Tree Training", "Tree Planting", and "Tree Quality" cue cards and "Tree and Plant Root Management Standard and Quality Expectations" contained in Section 5 of these Standards.

6. Plants shall be removed from their containers only at the time of placement within the plant pit. Perform root pruning on all four sides of the root ball by shaving and cutting away the root ball periphery to reduce the amount of circling roots. Starting from the top and then cutting/slicing down to the bottom of the root ball. On a 15 gal container at least 1-1.5 inches of the root ball periphery needs to be removed by slicing or shaving. On a 24” and 36”box tree at least 2 inches of the root ball periphery needs to be removed by slicing or shaving. A sharp hand pruning saw needs to be used for the slicing or shaving of the root ball. Refer to the CALFIRE "Root Management" cue card contained in Section 5 of these Standards. This process will remove many girdling and circling roots deflected by the container wall and allows for root penetration within the planting basin. Spread all roots to the side to allow proper root development. Add native backfill and amendments as shown in the Parks Construction Standards and as recommended by the soils testing laboratory.

7. Plant tree at least three inches (2”) above grade on mount to prevent bowl effect. The tree’s beginning root flare must be located at top of grade with installed sod.

8. Carefully place plant into the plant pit without damaging the root ball. Water the backfill until saturated. For trees, water in by hand after planting using at least ten (10) gallons of water, minimum.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1181 of 1714 ends

JM-52 Park
October 2025
Section 32 90 00: Planting

Page 8 of 11 ends

9. Where mowing will occur, provide an eight-foot (8’) minimum horizontal clearance between trees and other site improvements, including shrubs.

10.Tree ties should be installed via a figure eight loop and each tie shall be secured with a nail on the tree stake. Install two (2) Super Tree Ties at 2/3 of tree height and two (2) Super Tree Ties at ½ of tree height.

11.Tree stakes should be inserted into the ground to a minimum depth of 18".

B. Groundcover Planting

1. Place groundcover plants in neat, straight, and parallel rows, triangularly spaced as shown on the Plans and as indicated herein.

2. Start the first row of planting at a distance equal to the on-center spacing required per plan, minimum, from the edge of the adjacent hardscape, mow band or header board.

3. Groundcover shall be installed to the outside edge of the water basins of trees or shrubs.

3.06 Seeding- Turf and Native
(Hydroseeding natural areas)
A. Lightly scarify areas to be hydroseeded.

B. Tank, hose and associated apparatus must be thoroughly clean and free of debris or other material prior to placement/spraying of seed.

C. Hydroseed turf mix shall contain the following:

Material Application Rate
Turf Seed Per Manufacturer’s Recommendations
Wood Cellulose Fiber Mulch 60 lbs. per 1,000 SF
Binder Per Manufacturer’s Recommendation
Fungicide (turf only) 1/3 lb. per 1,000 SF
Fertilizer 15-15-15 All Purpose Fertilizer. Rate per
Manufacuter’s Recommendation
Soil Conditioner Per Soil Conditioner soils lab
recommendation and as approved by
Parks, Recreation & Libraries Department
D. Blend mix in a hydraulic mixer until all material is consistently blended.

E. Apply mix at a rate of 125 pounds per 1,000 square feet unless otherwise recommended by the manufacturer.

F. Spray mixture consistently over the area to be hydroseeded. Protect adjacent areas such as paving, walls, play areas and other from overspray.

G. At the end of each day of spraying operations, clean up all areas where overspray has occurred.

H. Once seed is placed, it should not be allowed to dry out.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1182 of 1714 ends

JM-52 Park
October 2025
Section 32 90 00: Planting

Page 9 of 11 ends

3.07 Sod- Turf
A. Remove all “humps” and depressions prior to sodding.

B. Keep all sod rolls shaded and moist prior to installation.

C. Do not store sod rolls more than one (1) day. Sod shall be laid upon delivery.

D. Unroll sod one at a time for immediate installation.

E. Provide tight seam between rolls of sod (less than 1/8” gaps).

F. Stagger rows so that the ends of sod rolls are stepped.

G. For turf areas where sod is partially provided, add topsoil at all transition edges to same as finish grade.

H. Sod planted during high Summer temperatures may require fungicide application(s) as a preventative measure. A Pest Control Advisor should be consulted for recommendations. Contractor is responsible for the continued health and establishment of sod and any costs of preventative treaments.

3.08 Mulch
A. Prior to placing mulch, apply post-emergent herbicide to any weeds present, per label directions. After achieving die-off, weeds shall be mechanically cut down or hand-pulled to allow for mulch installation.

B. Prior to placing mulch, apply pre-emergent herbicide in all planting areas, per label directions.

C. Apply three inches (3”) of mulch in all landscape planter areas.

D. Keep mulch a minimum of three inches (3”) away from the trunks of all woody shrubs and four inches (6”) away from all trees. Taper mulch profile away from this point to prevent subsequent collection of mulch against trunks.

3.09 Watering
A. Upon completion of each planting or turf area, irrigate appropriately to ensure proper health and growth.

B. Continually adjust the irrigation for plant needs regardless of air temperature.

3.10 Clean-up
A. Upon completion of planting operations, collect and remove from site all empty plant containers, debris, rubbish and other trash.

B. Sweep clean and wash all hardscape areas.

C. Clean up shall occur, at minimum of once a week, at the end of the work week.

D. Maintain the entire site in a clean condition to the satisfaction of the City.

3.11 Pre-Final (Punch List) Review
A. See Section 011000 1.16 of the Summary of Work for notification process.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1183 of 1714 ends

JM-52 Park
October 2025
Section 32 90 00: Planting

Page 10 of 11 ends

B. The following conditions must be met in order for planting to be considered towards substantial completion, as required to enter into the establishment period described in Section 011000, 1.16:

1. For seeded turf:
a. Upon completion of the second mowing of completely germinated turf.

Second mowing is defined as full coverage of turfed area 90% weed free. b. Root depth – Turf grass roots shall be healthy, creamy-white in color and be 4” or greater in length/depth as measured from the soil surface to root tip. This shall be consistent throughout turfed area.
c. Turf shall be of uniform green color with no visible signs of stress due to soil fertility, moisture, disease or pests.

2. For sodded turf:
a. Accepted installation of the sod.
b. Turf shall be of uniform green color with no visible signs of stress due to soil fertility, moisture, disease or pests.

3. For trees and shrubs:
a. Trees and shrubs shall be properly installed, and with no visible signs of stress due to soil fertility, moisture, disease or pests.

3.12 Establishment Period
A. Active maintenance is required throughout the entire establishment period:

1. Maintain turf to a height of two and one half inches (2-1/2”) for cool season turf varieties and one and one half inches (1-1/2”) for warm season turf varieties. Maintained height shall be measured from the surface of finish grade to the top of the leaf blade throughout the establishment period, and mowed as frequently as required to maintain said height. At no time shall the leaf blade be mowed or cut more than 1/3 of the length of the blade.

Root mass/depth must remain consistent as measured at the start of establishment or greater.

2. Edge all turf areas along hardscape edges.

3. Re-seed all bare areas within the turf as soon as evident.

4. Immediately replace all dead plants.

5. As necessary, raise all trees and shrubs which have sunk within the plant pit beyond the levels indicated in the Standard details.

6. Keep all areas free of weeds, pests and disease.

7. For trees located in turf areas, maintain a circle free of turf at a distance described in the Standard details
B. Prior to the start of the final thirty (30) days of establishment:

1. All plant replacements shall be completed.

2. All plantings and turf shall be thriving and in a healthy condition.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1184 of 1714 ends

JM-52 Park
October 2025
Section 32 90 00: Planting

Page 11 of 11 ends

3. The lack of active maintenance prior to the final thirty (30) days may constitute a delay in the start of the final thirty (30) days of the establishment period.

3.13 Final Review
A. The Inspector shall review the site for completion of items noted, but not limited to, “B” below. All corrective action is required to enter into the final thirty (30) days of establishment.

B. The site shall be prepared for review, by ensuring that:

1. All spray heads have been properly adjusted,

2. Dead plants have been replaced,

3. Planting areas have been weeded,

4. Turf areas have full germination, are consistent in green color and are weed-free,

5. Walkways and paved areas have been swept and washed, and

6. Turf roots meet standards outlined in 3.10
C. Failure to complete any one or all of the above items may constitute nonperformance of the final review and will require re-scheduling. In this case, the cost of the extended establishment period shall be at no additional cost to the City.

PART 4 - GUARANTEE

4.01 General
A. Contractor shall provide a written guarantee covering all plant materials (trees & shrubs) furnished by them to be free of all defects or disease and that all plants are in a healthy and thriving condition at the completion of the contract.

Deciduous plant material shall be warranted beyond the time of contract completion until such time as growth becomes evident.

B. All plants, except those provided by the City, shall be warrantied for a period of one (1) year, commencing on the date of final acceptance. The warranty shall be as outlined in Section 011000: Summary of Work, paragraph 1.19.

END OF SECTION

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1185 of 1714 ends

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1186 of 1714 ends

JM-52 Park
October 2025
Section 33 00 00: Utilities

Page 1 of 5 ends

SECTION 33 00 00

UTILITIES
PART 1 - GENERAL

1.01 General Requirements
A. The requirements set forth in the General Conditions shall be in addition to the standards provided herein.

B. The requirements set forth in the Supplemental Conditions shall be in addition to the standards provided herein.

C. The standards set forth in the City of Roseville Design and Construction Standards, latest edition, for storm drainage throughout the project and for sanitary sewer installations within the public rights-of-ways, easements, or as shown on the improvement plans shall be in addition to the standards provided herein.

D. The standards set forth in the latest edition of the California Building Code (CBC) for sanitary sewer installation within the project site, outside of the public right-of-way or easement shall be in addition to the standards provided herein.

1.02 Description
A. Furnish all labor, materials and equipment for the complete installation of the storm drain system and sanitary sewer pipe, and necessary appurtenances as shown on the Plans and as specified herein.

B. Submit a materials listing for review and approval prior to commencement of specified work.

1.03 Related Work
A. Section 31 10 00: Clearing and Grubbing
B. Section 31 20 00: Earthwork

1.04 Safety Requirements
A. Furnish, install and maintain required sheeting, shoring, bracing, and other methods to ensure complete and safe work environment for all workers. Upon completion of work, remove all bracing, shoring, etc. in its entirety, unless otherwise directed by the Inspector.

B. Prior to excavation or trenching, the Contractor shall contact USA Alert (800) C. 227-2600 to locate all known utilities a minimum of 48 hours prior to start of work. During the course of construction, the Contractor shall take every precaution to maintain and protect utilities noted to remain. Said utilities shall remain operational at all times, unless otherwise noted on the plans.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1187 of 1714 ends

JM-52 Park
October 2025
Section 33 00 00: Utilities

Page 2 of 5 ends

D. The existing utilities are shown on the Plans based on the information available at the time of contract document development. The City shall not assume responsibility for any inaccuracies or incompleteness of the Plans based on such information. The Contractor shall immediately notify, upon damage of any pipeline or facility, the Owner and/or its agents and take every action necessary to repair or replace damaged facilities to the satisfaction of the Inspector, and at no additional cost to the City.

E. Trenches, excavations and repair of pavement shall be consistent with Section 31 20 00: Earthwork.

1.05 Coordination
A. The piping system as shown on the Plans is diagrammatic. The Contractor shall make reasonable adjustments to the layout to avoid conflicts, based on actual field conditions. Said changes shall not interfere with the design intent of the system.

1.06 Tolerance
A. The allowable tolerance for the installation of pipe is 0.05 feet within grades or spot elevations indicated on the Plans.

1.07 Product Storage
A. Take every precaution to protect the materials and pipes from damage during the delivery, storage and installation of the pipe system. Store in a cool, contained area, protected from direct sunlight and per manufacturer’s recommendations. Pipe shall be supported on firm level ground at the site.

1.08 Record Drawings
A. The Contractor shall keep an accurate record of the as-built conditions of the storm drain and sanitary sewer system. These records shall be updated daily and kept at the construction site. At any time, the Inspector may examine the conditions of the “as-builts” to ensure compliance of the above.

PART 2 - PRODUCTS

2.01 General
A. All products shall conform to City of Roseville Design and Construction Standards, latest edition, except as noted below.

2.02 Drain Pipe
A. Solid drainpipe shall be PVC SDR 35 and shall conform to ASTM D1784, or accepted equal. Gasketed connections shall conform to ASTM F477.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1188 of 1714 ends

JM-52 Park
October 2025
Section 33 00 00: Utilities

Page 3 of 5 ends

B. Perforated drainpipe shall be smooth walled PVC, open per Caltrans Section 68-1.02K, or accepted equal.

2.03 Drain Rock
A. Drain rock shall be Class 2 washed, ¾” diameter.

2.04 Filter Fabric
A. Filter fabric shall be Mirafi 140N, or accepted equal.

2.05 Drains
A. Drain Inlets shall be pre-cast and a minimum size of twenty-four inches (24”) square or round by Jensen Precast, or accepted equal.

1. Grate shall be heavy duty, cast iron, walk-on, and bolt down.

2. Box extensions shall be Jensen Precast, or accepted equal.

3. The base shall be six inches (6”) thick.

4. Walls shall be six inches (6”) thick.

5. A “No Dumping” Metal Storm Drain Marker shall be affixed to the concrete color of each drain inlet (See Detail DR-20)

6. Contractor may install cast-in-place drain inlets in lieu of pre-cast drain inlets.

Submit shop drawings and concrete mix design for review and approval.

B. Channel Drains for baseball/softball backstop areas shall be Polycast 600 series pre-sloped trench drains with galvanized steel slotted grates or accepted equal.

C. Sanitary sewer clean outs shall be as specified in the City of Roseville, Design and Construction Standards, latest edition.

2.06 Manholes
A. Manholes shall have tongue and groove joints, be forty-eight inches (48”) minimum in diameter, meeting ASTM C-478.

B. Covers shall be cast iron.

C. All components shall conform to the City of Roseville Design and Construction Standards, latest edition.

2.07 Tracer Wire
A. Insulated solid copper wire, minimum #12 gauge. Color per City of Roseville Design and Construction Standards.

2.08 Sanitary Sewer Pipe
A. Vitrified clay pipe (VCP) shall be as specified in Section 91 Sanitary Sewer in the City of Roseville, Design and Construction Standards, latest edition.

B. PVC SDR 35 may be used for drinking fountain drain applications only, with prior approval, and shall conform to ASTM D3034.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1189 of 1714 ends

JM-52 Park
October 2025
Section 33 00 00: Utilities

Page 4 of 5 ends

2.09 Potable Water Warning Tape
A. On sites with both Recycled water and potable water lines. Blue plastic tape, 3 inches wide, with the words “CAUTION: POTABLE WATERLINE” imprinted in minimum 1-inch high, black letters per City of Roseville Design and Construction Standards. Imprinting shall be continuous and permanent.

PART 3 - EXECUTION

3.01 General
A. All pipes shall slope uniformly from given elevations shown on the Plans.

B. All pipes shall be accurately laid true to line and grade, utilizing accepted construction methods.

C. Damaged or cracked pipe and fittings shall not be installed and shall be removed from site.

D. Install all pipe in locations shown on the Plans, except where existing conditions necessitate minor changes.

E. All pipe and fittings shall be kept clean and closed throughout the course of construction.

F. Connections to existing sanitary sewer stubs shall be “TV-ed” and air tested prior to the start of construction per the City of Roseville Design and Construction Standards, latest edition.

3.02 Installation
A. Installation of the specified pipe lines shall conform to the City of Roseville Design and Construction Standards, latest edition.

B. Notify the Inspector a minimum of 48 hours prior to covering of work to ensure timely inspections.

C. Cutting of AC or concrete paving shall be clean, vertical and straight, using a saw, or other tool specific to this application. Replace paving to existing or better condition prior to work.

D. Trench and backfill shall be per City of Roseville Design and Construction Standards, latest edition.

E. Catch basins and drain inlets shall be installed with a concrete collar with “No Dumping” message and fish symbol depressed into the concrete or bolted in place, consistent with Drawing DR-20 the City of Roseville Design and Construction Standards, latest edition.

F. Drain inlets installed in mulched planter areas shall have a 12-inch wide collar of 2- to 6-inch river cobble placed over filter fabric.

G. Channel drains shall be set per manufacturer’s instructions. Place slotted grates along the entire length of the backstop, including wing fencing, wherever concrete is placed adjacent to the backstop system. Provide a below grade

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1190 of 1714 ends

JM-52 Park
October 2025
Section 33 00 00: Utilities

Page 5 of 5 ends

piped connection at all gate openings into the infield area. Do not install grated drain sections at these entry/exit points.

H. Manholes shall be per City of Roseville Design and Construction Standards, latest edition. Install grate flush with finish grade.

I. Sanitary Sewer Clean-outs shall be installed with 3M ball markers and shall be located within planted or turf areas, whenever possible. Place clean-outs at 100’ intervals throughout the project. Clean-outs shall not be located within play areas. Install per City of Roseville Design and Construction Standards, latest edition.

J. Upon completion, thoroughly flush storm drain system in the presence of the Parks Inspector.

K. Installation of additional products not listed in the City Standards.

3.03 Tracer Wire
A. Install tracer wire on top of the potable water lines B. Tracer wire shall be continuous with no splices.

3.04 Potable Water Warning Tape
A. To be used on all potable water piping installed within the same project limits as on-site recycled water piping.

B. Install plastic warning tape in pipe backfill, six inches above pipe, for the entire length of the pipe.

3.05 Cleaning
A. Keep site clean at all times. Remove from the site all debris and rubbish and legally dispose.

END OF SECTION

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1191 of 1714 ends

DRAW
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024]

DRAWINGS
Project: __________________________

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1192 of 1714 ends

AB 626 - 1
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] TEXT OF AB 626
Assembly Bill No. 626
CHAPTER 810
An act to add and repeal Section 9204 of the Public Contract Code, relating to public contracts.
[Approved by Governor September 29, 2016. Filed with Secretary of State September 29, 2016.]
LEGISLATIVE COUNSEL’S DIGEST
AB 626, Chiu. Public contracts: claim resolution.

Existing law prescribes various requirements regarding the formation, content, and enforcement of state and local public contracts. Existing law applicable to state public contracts generally requires that the resolution of claims related to those contracts be subject to arbitration.

Existing law applicable to local agency contracts prescribes a process for the resolution of claims related to those contracts of $375,000 or less.

This bill would establish, for contracts entered into on or after January 1, 2017, a claim resolution process applicable to any claim by a contractor in connection with a public works project. The bill would define a claim as a separate demand by the contractor for one or more of the following: a time extension for relief from damages or penalties for delay, payment of money or damages arising from work done pursuant to the contract for a public work, or payment of an amount disputed by the public entity, as specified.

This bill would require a public entity, defined to exclude certain state entities, upon receipt of a claim sent by registered or certified mail, to review it and, within 45 days, provide a written statement identifying the disputed and undisputed portions of the claim. The bill would authorize the 45-day period to be extended by mutual agreement. The bill would require any payment due on an undisputed portion of the claim to be processed within 60 days, as specified. The bill would require that the claim be deemed rejected in its entirety if the public entity fails to issue the written statement.

This bill would authorize, if the claimant disputes the public entity’s written response or if the public entity fails to respond to a claim within the time prescribed, the claimant to demand to meet and confer for settlement of the issues in dispute. The bill would require any disputed portion of the claim that remains in dispute after the meet and confer conference to be subject to nonbinding mediation, as specified. The bill would provide that unpaid claim amounts accrue interest at 7% per annum. The bill would prescribe a procedure by which a subcontractor or lower tier contractor may make a claim through the contractor.

This bill would require the text of these provisions, or a summary, to be set forth in the plans or specifications for any public work which may give rise to a claim. The bill would specify that a waiver of these rights is void and contrary to public policy, except as specified. The bill would also specify that it does not impose liability on a public entity that makes loans or grants available through a competitive application process, for the failure of an awardee to meet its contractual obligations.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1193 of 1714 ends

AB 626 - 2
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] By increasing the duties of local agencies and officials, this bill would impose a statemandated local program.

This bill would, on January 1, 2020, repeal the provision establishing the claim resolution process.

This bill would specify that these provisions constitute a matter of statewide concern.

The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.

This bill would provide that, if the Commission on State Mandates determines that the bill contains costs mandated by the state, reimbursement for those costs shall be made pursuant to these statutory provisions.

The people of the State of California do enact as follows:

SECTION 1. Section 9204 is added to the Public Contract Code, to read:
9204. (a) The Legislature finds and declares that it is in the best interests of the state and its citizens to ensure that all construction business performed on a public works project in the state that is complete and not in dispute is paid in full and in a timely manner.
(b) Notwithstanding any other law, including, but not limited to, Article 7.1 (commencing with Section 10240) of Chapter 1 of Part 2, Chapter 10 (commencing with Section 19100) of Part 2, and Article 1.5 (commencing with Section 20104) of Chapter 1 of Part 3, this section shall apply to any claim by a contractor in connection with a public works project. (c) For purposes of this section:
(1) ”Claim” means a separate demand by a contractor sent by registered mail or certified mail with return receipt requested, for one or more of the following:
(A) A time extension, including, without limitation, for relief from damages or penalties for delay assessed by a public entity under a contract for a public works project. (B) Payment by the public entity of money or damages arising from work done by, or on behalf of, the contractor pursuant to the contract for a public works project and payment for which is not otherwise expressly provided or to which the claimant is not otherwise entitled. (C) Payment of an amount that is disputed by the public entity. (2) ”Contractor” means any type of contractor within the meaning of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code who has entered into a direct contract with a public entity for a public works project. (3) (A) ”Public entity” means, without limitation, except as provided in subparagraph (B), a state agency, department, office, division, bureau, board, or commission, the California State University, the University of California, a city, including a charter city, county, including a charter county, city and county, including a charter city and county, district, special district, public authority, political subdivision, public corporation, or nonprofit transit corporation wholly owned by a public agency and formed to carry out the purposes of the public agency. (B) ”Public entity” shall not include the following:
(i) The Department of Water Resources as to any project under the jurisdiction of that department.
(ii) The Department of Transportation as to any project under the jurisdiction of that department.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1194 of 1714 ends

AB 626 - 3
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] (iii) The Department of Parks and Recreation as to any project under the jurisdiction of that department.
(iv) The Department of Corrections and Rehabilitation with respect to any project under its jurisdiction pursuant to Chapter 11 (commencing with Section 7000) of Title 7 of Part 3 of the Penal Code.
(v) The Military Department as to any project under the jurisdiction of that department. (vi) The Department of General Services as to all other projects. (vii) The High-Speed Rail Authority.
(4) ”Public works project” means the erection, construction, alteration, repair, or improvement of any public structure, building, road, or other public improvement of any kind. (5) ”Subcontractor” means any type of contractor within the meaning of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code who either is in direct contract with a contractor or is a lower tier subcontractor. (d) (1) (A) Upon receipt of a claim pursuant to this section, the public entity to which the claim applies shall conduct a reasonable review of the claim and, within a period not to exceed 45 days, shall provide the claimant a written statement identifying what portion of the claim is disputed and what portion is undisputed. Upon receipt of a claim, a public entity and a contractor may, by mutual agreement, extend the time period provided in this subdivision. (B) The claimant shall furnish reasonable documentation to support the claim. (C) If the public entity needs approval from its governing body to provide the claimant a written statement identifying the disputed portion and the undisputed portion of the claim, and the governing body does not meet within the 45 days or within the mutually agreed to extension of time following receipt of a claim sent by registered mail or certified mail, return receipt requested, the public entity shall have up to three days following the next duly publicly noticed meeting of the governing body after the 45-day period, or extension, expires to provide the claimant a written statement identifying the disputed portion and the undisputed portion. (D) Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. If the public entity fails to issue a written statement, paragraph (3) shall apply.
(2) (A) If the claimant disputes the public entity’s written response, or if the public entity fails to respond to a claim issued pursuant to this section within the time prescribed, the claimant may demand in writing an informal conference to meet and confer for settlement of the issues in dispute. Upon receipt of a demand in writing sent by registered mail or certified mail, return receipt requested, the public entity shall schedule a meet and confer conference within 30 days for settlement of the dispute.
(B) Within 10 business days following the conclusion of the meet and confer conference, if the claim or any portion of the claim remains in dispute, the public entity shall provide the claimant a written statement identifying the portion of the claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. Any disputed portion of the claim, as identified by the contractor in writing, shall be submitted to nonbinding mediation, with the public entity and the claimant sharing the associated costs equally. The public entity and claimant shall mutually agree to a mediator within 10 business days after the disputed portion of the claim has been identified in writing. If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the claim. Each

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1195 of 1714 ends

AB 626 - 4
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator. If mediation is unsuccessful, the parts of the claim remaining in dispute shall be subject to applicable procedures outside this section. (C) For purposes of this section, mediation includes any nonbinding process, including, but not limited to, neutral evaluation or a dispute review board, in which an independent third party or board assists the parties in dispute resolution through negotiation or by issuance of an evaluation. Any mediation utilized shall conform to the timeframes in this section. (D) Unless otherwise agreed to by the public entity and the contractor in writing, the mediation conducted pursuant to this section shall excuse any further obligation under Section 20104.4 to mediate after litigation has been commenced. (E) This section does not preclude a public entity from requiring arbitration of disputes under private arbitration or the Public Works Contract Arbitration Program, if mediation under this section does not resolve the parties’ dispute.
(3) Failure by the public entity to respond to a claim from a contractor within the time periods described in this subdivision or to otherwise meet the time requirements of this section shall result in the claim being deemed rejected in its entirety. A claim that is denied by reason of the public entity’s failure to have responded to a claim, or its failure to otherwise meet the time requirements of this section, shall not constitute an adverse finding with regard to the merits of the claim or the responsibility or qualifications of the claimant. (4) Amounts not paid in a timely manner as required by this section shall bear interest at 7 percent per annum.
(5) If a subcontractor or a lower tier subcontractor lacks legal standing to assert a claim against a public entity because privity of contract does not exist, the contractor may present to the public entity a claim on behalf of a subcontractor or lower tier subcontractor. A subcontractor may request in writing, either on his or her own behalf or on behalf of a lower tier subcontractor, that the contractor present a claim for work which was performed by the subcontractor or by a lower tier subcontractor on behalf of the subcontractor. The subcontractor requesting that the claim be presented to the public entity shall furnish reasonable documentation to support the claim. Within 45 days of receipt of this written request, the contractor shall notify the subcontractor in writing as to whether the contractor presented the claim to the public entity and, if the original contractor did not present the claim, provide the subcontractor with a statement of the reasons for not having done so.
(e) The text of this section or a summary of it shall be set forth in the plans or specifications for any public works project that may give rise to a claim under this section. (f) A waiver of the rights granted by this section is void and contrary to public policy, provided, however, that (1) upon receipt of a claim, the parties may mutually agree to waive, in writing, mediation and proceed directly to the commencement of a civil action or binding arbitration, as applicable; and (2) a public entity may prescribe reasonable change order, claim, and dispute resolution procedures and requirements in addition to the provisions of this section, so long as the contractual provisions do not conflict with or otherwise impair the timeframes and procedures set forth in this section.
(g) This section applies to contracts entered into on or after January 1, 2017. (h) Nothing in this section shall impose liability upon a public entity that makes loans or grants available through a competitive application process, for the failure of an awardee to meet its contractual obligations.
(i) This section shall remain in effect only until January 1, 2020, and as of that date is

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1196 of 1714 ends

AB 626 - 5
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] repealed, unless a later enacted statute, that is enacted before January 1, 2020, deletes or extends that date.

SECTION 2.

The Legislature finds and declares that it is of statewide concern to require a charter city, charter county, or charter city and county to follow a prescribed claims resolution process to ensure there are uniform and equitable procurement practices.

SECTION 3.

If the Commission on State Mandates determines that this act contains costs mandated by the state, reimbursement to local agencies and school districts for those costs shall be made pursuant to Part 7 (commencing with Section 17500) of Division 4 of Title 2 of the Government Code.

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1197 of 1714 ends

APPENDIX A - SOIL REPORT

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1198 of 1714 ends

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1199 of 1714 ends

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1200 of 1714 ends

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1201 of 1714 ends

FOR COUNCIL ONLY NOT FOR CONSTRUCTION

Page 1202 of 1714 ends

JM-52
PARK
1 CV-1.0

AS SHOWN
AM

COVER SHEET
CWJ# - 500290
EN# - 25-0591
JM-52 PARK

SHEET INDEX
NOTE:

IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE ALL

MATERIALS AND WORK AS DETAILED IN THE CITY OF ROSEVILLE PARKS CONSTRUCTION STANDARDS - JULY 2025 OR LATEST

EDITION AND THE CITY OF ROSEVILLE DESIGN & CONSTRUCTION STANDARDS - JANUARY 2013 WITH 2021 AMENDMENTS OR LATEST EDITION. CONTRACTOR SHALL PROVIDE SUBMITTALS BASED ON

THE PROVIDED DRAWINGS AND ALL REQUIREMENTS IN THE ABOVE MENTIONED GUIDELINES.

CITY OF ROSEVILLE GENERAL NOTES:

CV-1.0 COVER SHEET 1
CV-2.0A CAL GREEN DOCUMENTATION 2
CV-2.0B CAL GREEN DOCUMENTATION 3
CV-2.0C CAL GREEN DOCUMENTATION 4
SA-1.0 SITE ACCESSIBILITY PLAN 5
SW-1.0 SCOPE OF WORK PLAN 6
LC-1.0 LANDSCAPE CONSTRUCTION PLAN & KEYNOTES 7
LC-2.0 LANDSCAPE CONSTRUCTION DETAILS 8
SS-1 SHADE STRUCTURE ENGINEERING: NOTES/LOM 9
SS-2 SHADE STRUCTURE ENGINEERING: VIEWS AND DETAILS 10
SS-3 SHADE STRUCTURE ENGINEERING: FOOTING DETAILS 11
C1.0 GRADING & DRAINAGE PLAN 12
C1.1 GRADING DETAILS & SECTIONS 13
C1.2 DRAINAGE DETAILS - CITY 14
C2.0 EROSION CONTROL PLAN 15
LL-1.0 LANDSCAPE LAYOUT PLAN & NOTES 16
LI-1.0 LANDSCAPE IRRIGATION PLAN & LEGEND 17
LI-1.1 LANDSCAPE IRRIGATION PLAN - MAINLINE LAYOUT 18
LI-2.0 LANDSCAPE IRRIGATION NOTES 19
LI-2.1 MWELO DOCUMENTATION 20
LI-2.2 LANDSCAPE IRRIGATION DETAILS 21
LI-2.3 LANDSCAPE IRRIGATION DETAILS 22
LP-1.0 LANDSCAPE PLANTING PLAN & LEGEND 23
LP-2.0 LANDSCAPE PLANTING NOTES & DETAILS 24
E0.1 ELECTRICAL COVER SHEET 25
E0.2 SERVICE PEDESTAL ONE-LINE DIAGRAM & ELEVATION, 26

FEEDER SCHEDULE AND LOAD CALCULATIONS
E0.3 TITLE 24 LTO FORMS 27
E1.0 ELECTRICAL SITE PLAN 28
E2.0 ELECTRICAL DETAILS 29
E2.1 ELECTRICAL DETAILS 30
TOTAL SHEETS 30
ALL WORK SHALL CONFORM TO THE FOLLOWING MODEL CODES:
2022 CALIFORNIA BUILDING CODE WITH CITY OF ROSEVILLE AMENDMENTS (CBC) , 2022 CALIFORNIA GREEN BUILDING STANDARDS CODE (CGBSC),
2022 CALIFORNIA MECHANICAL CODE (CMC),
2022 CALIFORNIA PLUMBING CODE (CPC),
2022 CALIFORNIA ELECTRICAL CODE WITH CITY AMENDMENTS (CEC), 2022 CALIFORNIA ENERGY CODE (CEC PART 6),
2022 CALIFORNIA FIRE CODE WITH CITY OF ROSEVILLE AMENDMENTS (RFC).

SITE MAP

1. PRIOR TO COMBUSTIBLE MATERIALS BEING BROUGHT TO

THE SITE, FIRE APPARATUS ACCESS ROADS SHALL BE
PROVIDED TO WITHIN 150 FEET OF ALL PORTIONS OF THE

EXTERIOR WALLS OF THE FIRST STORY OF ANY
STRUCTURES AND COMBUSTIBLE STORAGE PILES. FIRE

APPARATUS ACCESS ROADS SHALL BE FULLY PAVED AND

SHALL BE DESIGNED TO SUPPORT THE IMPOSED WEIGHT
OF A FIRE APPARATUS (34 TONS GVW). ACCESS ROADS
SHALL BE PROVIDED WITH A MINIMUM 20-FOOT ROADWAY
WIDTH AND 13 FOOT 6-INCH VERTICAL CLEARANCE.

2. CONSTRUCT/ON MATERIAL AND VEHICLES SHALL NOT

OBSTRUCT FIRE APPARATUS ACCESS TO FIRE APPARATUS
ROADS, FIRE HYDRANTS OR THE BUILDING.

3. TEMPORARY ABOVE GROUND FUEL STORAGE TANKS MAY

BE USED ON CONSTRUCT/ON SITES FOR DIESEL FUEL ONLY
AND SHALL NOT EXCEED 1, 000-GALLON LIQUID CAPACITY.

SUCH INSTALLATIONS SHALL COMPLY WITH ALL
APPLICABLE PROVISIONS OF THE CITY FIRE CODE. A FIRE

DEPARTMENT PERMIT SHALL BE OBTAINED PRIOR TO THE
PLACEMENT OF SUCH TANKS ON THE SITE.

4. THE STREET ADDRESS OF THE CONSTRUCTION SITE SHALL

BE CLEARLY IDENTIFIED AT ALL ENTRANCES INTO THE
PROJECT. SUCH NUMBERS SHALL BE CLEARLY VISIBLE

FROM THE STREET FRONTING THE PROPERTY AND SHALL

CONTRAST IN COLOR WITH THEIR BACKGROUND (MINIMUM
6-INCH LETTERING).

5. FIRE SAFETY DURING CONSTRUCT/ON. CHAPTER 33 OF THE

CALIFORNIA FIRE CODE REQUIRES CERTAIN SAFETY

PROCEDURES TO BE FOLLOWED DURING NEW
CONSTRUCT/ON AND REMODELS. THIS ARTICLE CONCERNS
FIRE SAFETY IN THE FOLLOWING AREAS: ACCESS, WATER
CITY OF ROSEVILLE FIRE DEPARTMENT GENERAL NOTES:

MODEL CODES

BUILDING CLASSIFICATION
A. OCCUPANCY GROUP: U
B. TYPE OF CONSTRUCTION: V-B NON SPRINKLED
C. FLOOR AREA (S.F.): 528 S.F.

D. NUMBER OF STORIES: 1
E. TOTAL OCCUPANT LOAD: N/A

STATE WATER RESOURCES CONTROL
BOARD W.D.I.D. IDENTIFICATION NO.:
5S31C40xxxx

HOURS OF CONSTRUCTION

IN ACCORDANCE WITH THE CITY'S NOISE ORDINANCE, THE

HOURS OF PROJECT CONSTRUCTION SHALL BE LIMITED TO THE
FOLLOWING:
7:00 A.M. TO 7:00 P.M. (MONDAY THRU FRIDAY)
8:00 A.M. TO 8:00 P.M. (SATURDAY , SUNDAY & HOLIDAYS)

VICINITY MAP
N.T.S.

UTILITY REPRESENTATIVES

UTILITY COMPANY CONTACT PHONE
U.S.A. - - 1.800.642.2444
GAS PG&E JEANETTE JOHNSON 530.883.3147
ELECTRICITY ROSEVILLE ELECTRIC KEITH LITTS 916.580.9405 TELEPHONE ROSEVILLE TELEPHONE GEORGE DEMPSEY 916.786.4351

WATER CITY OF ROSEVILLE

ENVIRONMENTAL

UTILITIES
916.774.5750

SEWER CITY OF ROSEVILLE

ENVIRONMENTAL

UTILITIES
916.774.5750

DRAINAGE DEVELOPMENT SERVICES

ENGINEERING
ENGINEERING 916.774.5339
T.V. CABLE COMCAST KATHY DEAN 916.786.8443
FIRE CITY OF ROSEVILLE MICHAEL BRADLEY 916.774.5800
PREPARED FOR:

TARA GEE

CITY OF ROSEVILLE - PARKS, RECREATION & LIBRARIES DEPARTMENT 316 VERNON STREET, SUITE 400 ROSEVILLE, CA 95678
916.774.5253
N.T.S.

REF: CFC APPENDIX CHAPTER 1 SECTION 105.4.2 & SECTION 105.4.7 AS AMENDED BY CITY OF ROSEVILLE.

SUPPLY, EXTINGUISHERS, STANDPIPES, DEBRIS,

MOTORIZED EQUIPMENT, HEATING DEVICES, SMOKING,

CUTTING AND WELDING, FLAME PRODUCING EQUIPMENT,

FLAMMABLE LIQUIDS, ASPHALT AND TAR KETTLES,

TEMPORARY WIRING, EMERGENCY TELEPHONE

MODIFICATION OF EXISTING SYSTEMS, EXITS, BURNING OF
ANY MATERIAL, AND FIRE WATCH. IT IS YOUR

RESPONSIBILITY TO BECOME FAMILIAR WITH THESE

REQUIREMENTS AND SEE THAT ALL PERSONS ON THE JOB
SITE COMPLY.

5. THE BURNING OF COMBUSTIBLE CONSTRUCTION MATERIAL
AND TRASH IS PROHIBITED.

6. A MINIMUM 3-FOOT CLEAR SPACE SHALL BE PROVIDED AND
MAINTAINED AROUND FIRE PROTECTION EQUIPMENT.

7. AT ALL FIRE HYDRANT LOCATIONS, A BLUE REFLECTIVE

PAVEMENT MARKER SHALL BE INSTALLED ONE FOOT OFF

PAVED CENTERLINE OR MEDIAN ON THE HYDRANT SIDE OF
THE ROADWAY.

8. IF SITE SURVEY OR EARTH MOVING WORK RESULTS IN THE

DISCOVERY OF HAZARDOUS MATERIALS IN CONTAINERS,

OR WHAT APPEARS TO BE HAZARDOUS WASTES RELEASED

INTO THE GROUND, THE CONTRACTOR OR APPLICANT

SHALL IMMEDIATELY REPORT THE FINDING TO THE
ROSEVILLE FIRE DEPARTMENT VIA PHONE AT (916)
774-5800. ALL SUSPECTED AREAS SHALL BE MARKED OFF

WITH APPROVED SIGNAGE OR CAUTION TAPE UNTIL SUCH

TIME THAT A REPRESENTATIVE FROM THE FIRE

DEPARTMENT DETERMINES WHETHER THE RELEASE IS

REPORTABLE OR NOT AND IF SITE REMEDIATION IS
REQUIRED.

10. THE REQUIRED MINIMUM FIRE FLOW FOR THE PROTECTION
OF THE PROPOSED PROJECT IS 1,500 GALLONS PER
MINUTE WITH 20 POUNDS PER SQUARE INCH RESIDUAL
WATER PRESSURE REMAINING IN THE SYSTEM.

11. FIRE HYDRANTS SHALL BE INSTALLED AND IN SERVICE

CAPABLE OF PROVIDING THE REQUIRED FIRE FLOW PRIOR

TO ANY COMBUSTIBLE CONSTRUCT/ON OR ON-SITE
STORAGE OF COMBUSTIBLE MATERIALS.

12. ALL FIRE HYDRANTS SHALL BE "BAGGED" OR
OUT-OF-SERVICE UNTIL THE ABOVE FOUR (4) INSPECTIONS
ARE COMPLETED.

13. WATER SUPPLY CONTROL VALVES SHALL NOT BE CLOSED

BY THE CONTRACTOR UPON ACCEPTANCE OF THE

FIRE-FLOW TEST BY THE FIRE DEPARTMENT, UNLESS

ENVIRONMENTAL UTILITIES AND THE FIRE DEPARTMENT
ARE CONTACTED AND ADVISED OF THE CLOSURE.

14. TESTING OF ALL FIRE SYSTEMS SHALL BE PERFORMED

PRIOR TO THE SALES OFFICE CAN BE OPENED FOR
BUSINESS.

15. FRAMING CONSTRUCTION CANNOT COMMERCE UNTIL

ACCESS ROADS AND PUBLIC FIRE HYDRANTS ARE
APPROVED BY THE FIRE DEPARTMENT.

16. IF THIS PROJECT WILL BE PHASED, THE FIRE DEPARTMENT

REQUIREMENTS FOR ACCESS AND CIRCULATION

THROUGHOUT SHALL BE APPROVED BY THE CITY FOR
SUCH PROPOSAL. ACCESS ROAD SHALL COMPLY IN

ACCORDANCE WITH THE CALIFORNIA FIRE CODE AND THE
CITY OF ROSEVILLE'S AMENDMENTS. A SEPARATE PHASING

PLAN SHALL BE REVIEWED AND APPROVED BY THIS
DEPARTMENT.

MS4 PERMIT INFORMATION
ANTICIPATED START DATE: MARCH 2026
ANTICIPATED COMPLETION DATE: AUGUST 2026
PARCEL SIZE: 1.5 AC
ESTIMATED DISTRIBUTION OF SOIL: 1.5 AC
NEAREST CREEK: UNNAMED TRIBUTARY 400' SOUTHEAST

1. ALL CONSTRUCTION AND MATERIALS SHALL CONFORM

TO THESE PLANS AND THE LATEST EDITION AND

AMENDMENTS OF THE CITY OF ROSEVILLE DESIGN AND
CONSTRUCTION STANDARDS.

2. THE CITY OF ROSEVILLE IS A MEMBER OF THE
UNDERGROUND SERVICE ALERT (U.S.A.) ONE-CALL
SYSTEM. THE CONTRACTORS SHALL NOTIFY THE U.S.A.

CENTER 48 HOURS IN ADVANCE OF PERFORMING ANY
EXCAVATION WORK BY CALLING 1-800-227-2600.

3. THE CONTRACTOR SHALL MARK IN WHITE PAINT ALL
AREAS TO BE EXCAVATED PRIOR TO CONTACTING U.S.A.

ANY AREAS NOT MARKED WILL NOT BE SUBJECT TO
U.S.A., AND THE CONTRACTOR SHALL BE RESPONSIBLE
FOR ANY DAMAGE RESULTING FROM EXCAVATION.

4. THE CONTRACTOR SHALL EXPOSE AND VERIFY

LOCATIONS AND ELEVATIONS OF EXISTING

UNDERGROUND UTILITIES PRIOR TO CONSTRUCTION OF

THE NEW IMPROVEMENTS CONNECTING TO OR IN THE
VICINITY OF THE SAME.

5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE

PROTECTION OF ALL EXISTING MONUMENTS AND OTHER
SURVEY MARKERS ON THE JOB SITE.

6. THE CONTRACTOR SHALL PLACE BOXED SURVEY
MONUMENTS WITH 1-1/2" BRONZE HEAD SET IN
CONCRETE (STD. DWG. ST-36) AT LOCATIONS SHOWN ON
THESE PLANS.

7. A.C. SURFACE SHALL BE CUT TO A NEAT, STRAIGHT LINE

PARALLEL WITH THE STREET CENTERLINE AND THE

EXPOSED EDGE SHALL BE TACKED WITH EMULSION
PRIOR TO PAVING. THE EXPOSED BASE MATERIAL SHALL

BE GRADED, RE-COMPACTED, AND RESEALED PRIOR TO
PAVING.

8. ANY EXISTING CONCRETE SURFACE TO BE REMOVED
SHALL BE SAW CUT TO A NEAT, STRAIGHT LINE.

9. THE CONTRACTOR SHALL SUBMIT A TRAFFIC CONTROL

PLAN THAT SHALL BE ACCEPTED BY THE ENGINEERING

DIVISION OF PUBLIC WORKS BEFORE START OF WORK IN

RIGHT-OF-WAY AND SHALL BE IN ACCORDANCE WITH
CALIFORNIA MUTCD LATEST EDITION. AT LEAST ONE

LANE IN EACH DIRECTION SHALL REMAIN OPEN TO
TRAFFIC UNLESS OTHERWISE SHOWN ON THE PLANS.

TRAFFIC CONTROL HOURS ARE SUBJECT TO LIMITATION
BY THE CITY. TRAFFIC CONTROL WITH LANE CLOSURES
THAT AFFECT TRAFFIC FLOW MAY REQUIRE NIGHT WORK.

IF, AS A PART OF TRAFFIC CONTROL MEASURES, A

ROADWAY CLOSURE HAS BEEN APPROVED, THE

CONTRACTOR SHALL NOTIFY DEVELOPMENT SERVICES
CONSTRUCTION INSPECTOR 72 HOURS IN ADVANCE OF
SETTING UP THIS CLOSURE.

10. CURB RAMPS CONFORMING TO ALL ADA AND TITLE 24

REQUIREMENTS SHALL BE PLACED AT ALL NEW
STANDARD CURB RETURNS (STANDARD DRAWING ST-27)
AND STANDARD TYPE A-7 DRIVEWAYS. WHERE EXISTING
RAMPS DO NOT MEET CURRENT ADA AND TITLE 24

REQUIREMENTS, THE RAMPS SHALL BE UPGRADED IN
CONFORMANCE WITH MINIMUM TITLE 24 REQUIREMENTS.

WHERE EXISTING RAMPS DO NOT INCLUDE DETECTABLE

WARNING PANELS (TRUNCATED DOMES), PANELS SHALL
BE RETROFITTED PER THE CONSTRUCTION STANDARDS.

11. DRAIN INLETS NOT WITHIN A PAVED AREA SHALL HAVE A
12" WIDE COLLAR OF 6" THICK P.C.C. OR 2" THICK A.C.

12. PRIOR TO THE CERTIFICATE OF COMPLETION ON ALL

SINGLE-FAMILY RESIDENTIAL SUBDIVISIONS, THE

DEVELOPER SHALL SUBMIT A LETTER FROM THE POST

OFFICE STATING THAT ITS REQUIREMENTS FOR MAILBOX
CLUSTER PADS HAVE BEEN SATISFIED.

13. ALL UNDERGROUND UTILITIES WITHIN EXISTING OR

PROPOSED CITY OF ROSEVILLE EASEMENTS SHALL
REQUIRE A MINIMUM OF 90% COMPACTION ON THE
TRENCH BACKFILL. COMPACTION OF BACKFILL BY

JETTING IS NOT PERMITTED IN CITY OF ROSEVILLE RIGHT

OF WAY AND EASEMENT AREAS OR WITHIN DEDICATED

RECLAIMED WATER, STORM, SEWER OR WATER
EASEMENTS AND MAINS.

14. THE CONTRACTOR SHALL CONDUCT A

PRE-CONSTRUCTION MEETING ONE-WEEK PRIOR TO
STARTING WORK. MEMBERS OF THE CITY OF ROSEVILLE

DEVELOPMENT SERVICES DEPARTMENT,

ENVIRONMENTAL UTILITIES DEPARTMENT AND ALL OTHER

UTILITY REPRESENTATIVES SHALL BE NOTIFIED BY THE

CONTRACTOR AS TO THE DATE AND LOCATION OF THE
MEETING.

15. PRIOR TO EXCAVATION OF TRENCHES 5 FEET OR

DEEPER, THE CONTRACTOR SHALL SUBMIT TO THE

DEVELOPMENT SERVICES DEPARTMENT OR

ENVIRONMENTAL UTILITIES DEPARTMENT INSPECTOR A

COPY OF THE COMPANY'S ANNUAL CALOSHA TRENCHING

PERMIT AND A COPY OF THE COMPANY'S LETTER

INFORMING CALOSHA OF THE TIME THE TRENCHING IS
COMMENCING AND THE LOCATION OF THE WORK.

16. ALL PAINTED TRAFFIC STRIPES, ARROWS, AND PAVEMENT

MARKINGS SHALL BE CONSTRUCTED WITH

THERMOPLASTIC MATERIAL TO THE SPECIFICATIONS SET
FORTH IN CHAPTER 3 OF THE CALIFORNIA MUTCD LATEST
EDITION. NON-REFLECTIVE PAVEMENT MARKERS SHALL

CONSIST OF CERAMIC MARKERS ONLY CONFORMING TO
CHAPTER 3 OF THE CALIFORNIA MUTCD LATEST EDITION.

17. THE DEVELOPERS CONTRACTOR SHALL TAKE EXTREME

CARE TO PROTECT EXISTING SITE AND ADJACENT
IMPROVEMENTS FROM DAMAGE. THE CONTRACTOR

SHALL BE RESPONSIBLE TO REPAIR OR MAKE

REPLACEMENT OF ALL CRACKED AND OTHERWISE

PRE-EXISTING DAMAGED PUBLIC IMPROVEMENTS ALONG

THE FRONTAGE OF THE PROJECT SITE AND ANY DAMAGE

RESULTING FROM CONSTRUCTION TO CURRENT CITY
STANDARDS AND AT THEIR OWN EXPENSE. THE EXTENT

OF THE REPAIRS SHALL BE DETERMINED BY THE

DEVELOPMENT SERVICES CONSTRUCTION INSPECTOR

AND SHALL BE COMPLETED PRIOR TO THE CITY
ACCEPTANCE OF THE IMPROVEMENTS.

18. WHERE COMBINATIONS OF SIDEWALK OR CURB AND

GUTTER ARE PLACED CONTIGUOUS TO EXISTING, ALL

ADJOINING EXISTING CONCRETE VERTICAL FACES SHALL
BE DOWELED. ALL ABUTTING SIDEWALK ENDS SHALL BE

DOWELED MID-SECTION VERTICALLY WITH TWO DOWELS

FOR FOUR THROUGH SIX-FOOT WIDE SIDEWALK AND
THREE DOWELS FOR WIDER SIDEWALK. ABUTTING CURB
AND GUTTER ENDS SHALL BE DOWELED TWICE, 18
INCHES APART AT GUTTER PAN MID-SECTION. DOWEL

CONNECTIONS OF LONGITUDINAL RUNS OF SIDEWALK TO
BACK OF CURB SHALL BE THREE FEET ON CENTER. ALL
DOWELS SHALL BE 16 INCHES LONG, GRADE 60; #4 REBAR
PENETRATING FOUR INCHES. THE DOWEL HOLE SHALL
BE 5/8-INCH DIAMETER AT A SLIGHT HORIZONTAL ANGLE
FROM PERPENDICULAR. THE PENETRATING PORTION OF

THE DOWEL AND THE ENTIRE (CLEANED) VERTICAL

SURFACE OF THE ADJOINING, EXISTING CONCRETE

SHALL BE THOROUGHLY COATED WITH STATE STANDARD
TWO-PART EPOXY.
19 WHEN SAWCUTTING WITHIN THE STREET FOR

TRENCHING OR OTHER PURPOSES, CONTRACTOR SHALL
GRIND 1½” OF PAVEMENT BETWEEN THE LANE LINES
(FROM LANE STRIPE TO LANE STRIPE) UPON COMPLETION
OF THE SAWCUTTING AND OR TRENCHING WORK.

WHERE THE SAWCUTTING OCCURS BETWEEN THE CURB

AND GUTTER AND NEAREST LANE STRIPE (INCLUDING
BIKE LANES), THE SAME 1 ½” GRIND SHALL BE REQUIRED.

CONTRACTOR TO PLACE A PETROMAT FABRIC OR

APPROVED EQUAL BY THE CITY OF ROSEVILLE AND

OVERLAY FROM LANE STRIPE TO LANE STRIPE, OR CURB

TO LANE STRIPE AND RESTRIPE OR REPLACE ANY
DELINEATORS REMOVED DURING THE GRIND.

20. ALL PUBLICLY MAINTAINED STORM DRAIN ON PRIVATE
PROPERTY SHALL BE A MINIMUM OF 12 INCHES IN

DIAMETER AND SHALL BE RCP CL IV, UNLESS OTHERWISE
APPROVED BY THE CITY ENGINEER.

21. FOR RESIDENTIAL SUBDIVISIONS, UNLESS OTHERWISE

APPROVED BY DEVELOPMENT SERVICES ENGINEERING,

THE FINAL GRADING OF THE PROJECT SITE SHALL BE

CONSTRUCTED TO ACCOMMODATE A MAXIMUM
DRIVEWAY SLOPE OF 14% FOR EACH RESIDENTIAL LOT,

AS MEASURED FROM THE BACK OF THE SIDEWALK TO
THE GARAGE (20-FT SET BACK). IT WILL REMAIN THE

RESPONSIBILITY OF THE BUILDERS/DEVELOPER TO

DESIGN A HOUSE THAT PROVIDES SUITABLE ACCESS TO
THE PARCEL.

22. THE CONTRACTOR SHALL PLACE FILTER FABRIC

BETWEEN THE INITIAL BEDDING AND BACKFILL AND THE

TRENCH BACKFILL FOR SANITARY SEWERS DEPTH
GREATER THAN 15 FEET MEASURED TO THE PIPE INVERT.

CONSULTANTS/SUB-CONSULTANTS
CIVIL ENGINEERING: TSD ENGINEERING

DANA MOORE
916.608.0707 x104
ELECTRICAL ENGINEERING: CAPITAL ENGINEERING

NATHAN HEARN
916.851.3568

SPECIAL INSPECTIONS
1704.3.3 - HIGH STRENGTH BOLTING PER REQUIREMENTS ON SHEET 2 OF SHADE STRUCTURE DRAWINGS.
1704.4 - CONCRETE CONSTRUCTION PER REQUIREMENTS ON SHEET 3 OF SHADE STRUCTURE DRAWINGS. BRIGHT STAR ROAD JM-84

OPEN SPACE
BLUE OAKS BLVD. FIDDYMENT BLVD. WESTBROOK BLVD.

SUNSET
BLVD.

PLEASANT GROVE BLVD. WALERGA RD.

BASELINE
RD. FOOTHILLS BLVD. WATT AVE. SOUTH BREWER RD. COUNTRY ACRES LN. SANTUCCI BLVD. PALLADAY RD. BENCKMARK DESCRIPTION: 3 1 4" BRASS DISC STAMPED 2018 PLS
8278, LOCATED AT THE NORTHEAST CORNER OF THE

INTERSECTION OF FIDDYMENT ROAD AND WESTLAKE DRIVE ON
THE TOP OF CURB AT NORTH CURB RETURN.

BENCHMARK
CITY B.M. 126 (Roseville)
ELEV. 120.15 (NGVD 88) FOR BUILDING DEPARTMENT REVIEW:

SITE ACCESSIBILITY: SA-1.0
SHADE STRUCTURE: LC-2.1
ELECTRICAL: E0.1, E0.2, E0.3, E1.0, E2.0 & E2.1

CITY OF ROSEVILLE DEVELOPMENT SERVICES DEPARTMENT

CITY ENGINEER DATE
CLIENT:

PROJECT:

REVISIONS DATE

ISSUE DATE
DRAWN :

CHECKED :

SCALE: :

SHEET TITLE:

SHEET
OF SHEETS FUHRMAN LEAMY LAND GROUP HEREBY EXPRESSLY RESERVES ITS COMMON LAW COPYRIGHT AND OTHER PROPERTY RIGHTS IN THESE PLANS. THESE PLANS AND DRAWINGS ARE NOT TO BE REPRODUCED, CHANGED OR COPIED IN ANY FORM OR MANNER WHATSOEVER WITHOUT FIRST OBTAINING THE EXPRESS WRITTEN PERMISSION OF FUHRMAN LEAMY LAND GROUP. NOR ARE THEY TO BE ASSIGNED TO ANY THIRD PARTY WITHOUT FIRST OBTAINING WRITTEN PERMISSION AND CONSENT. 1 2
3 4
5 JOB NO. :

KCL

FUHRMAN LEAMY

LAND GROUP
DESIGN ¥ SERVICE ¥ SOLUTIONS
CRV: 25027
JM-52 PARK
5097 MISTY RIDGE DRIVE

ROSEVILLE, CA

CITY OF ROSEVILLE
30 CITY OF ROSEVILLE APPROVAL
3400 DOUGLAS BLVD, SUITE 275
ROSEVILLE, CALIFORNIA 95661
916.783.5263 • FLLANDGROUP.COM
R

EG ISTERED LANDSCAPE ARCH I T
E
C
T

STATE OF CAL I FORN IA
KEV I N C . LEAM
No. 4965 Y
12/31/26
Signature Renewal Date Date 1.15.2026

MISTY RIDGE DRIVE
JM-52
PARK
JM-4
LDR-5
JM-4
LDR-5

FOR COUNCIL ONLY - NOT FOR CONSTRUCTION

Page 1203 of 1714 ends

2 CV-2.0A

AS SHOWN
AM

CAL GREEN

DOCUMENTATION
CHAPTER 5

NONRESIDENTIAL MANDATORY MEASURES
SECTION 5.101 GENERAL

5.101.1 SCOPE
The provisions of this chapter outline planning, design and development methods that include environmentally responsible site selection, building design, building siting and development to protect, restore and enhance the environmental quality of the site and respect the integrity of adjacent properties.

DIVISION 5.1 PLANNING AND DESIGN
2022 CALIFORNIA GREEN BUILDING STANDARDS CODE
NONRESIDENTIAL MANDATORY MEASURES, SHEET 1 (January 2023) Y
SECTION 5.102 DEFINITIONS

5.102.1 DEFINITIONS
The following terms are defined in Chapter 2 (and are included here for reference) CUTOFF LUMINAIRES. Luminaires whose light distribution is such that the candela per 1000 lamp lumens does not numerically exceed 25 (2.5 percent) at an angle of 90 degrees above nadir, and 100 (10 percent) at a vertical angle of 80 degrees above nadir. This applies to all lateral angles around the luminaire.

LOW-EMITTING AND FUEL EFFICIENT VEHICLES.

Eligible vehicles are limited to the following:

1. Zero emission vehicle (ZEV), enhanced advanced technology PZEV (enhanced AT ZEV) or transitional zero emission vehicles (TZEV) regulated under CCR, Title 13, Section 1962.

2. High-efficiency vehicles, regulated by U.S. EPA, bearing a fuel economy and greenhouse gas rating od 9 oe 10 as regulated under 40 CFR Section 600 Subpart D.

NEIGHBORHOOD ELECTRIC VEHICLE (NEV). A motor vehicle that meets the definition of "low-speed vehicle" either in Section 385.5 of the Vehicle Code or in 49CFR571.500 (as it existed on July 1, 2000), and is certified to zero-emission vehicle standards.

TENANT-OCCUPANTS. Building occupants who inhabit a building during its normal hours of operation as permanent occupants, such as employees, as distinguished from customers and other transient visitors.

VANPOOL VEHICLE. Eligible vehicles are limited to any motor vehicle, other than a motortruck or truck tractor, designed for carrying more than 10 but not more than 15 persons including the driver, which is maintained and used primarily for the nonprofit work-related transportation of adults for the purpose of ridesharing.

Note: Source: Vehicle Code, Division 1, Section 668
ZEV. Any vehicle certified to zero-emission standards.

SECTION 5.106 SITE DEVELOPMENT

5.106.1 STORM WATER POLLUTION PREVENTION FOR PROJECTS THAT DISTURB LESS THAN ONE ACRE OF LAND. Newly constructed projects and additions which disturb less than one acre of land, and are not part of a larger common plan of development or sale, shall prevent the pollution of storm water runoff from the construction activities through one or more of the following measures:

5.106.1.1 Local ordinance. Comply with a lawfully enacted storm water management and/or erosion control ordinance.

5.106.1.2 Best Management Practices (BMPs). Prevent the loss of soil through wind or water erosion by implementing an effective combination of erosion and sediment control and good housekeeping BMPs.

1. Soil loss BMPs that should be considered for implementation as appropriate for each project include, but are not limited to, the following:
a. Scheduling construction activity during dry weather, when possible. b. Preservation of natural features, vegetation, soil, and buffers around surface waters. c. Drainage swales or lined ditches to control stormwater flow. d. Mulching or hydroseeding to stabilize disturbed soils. e. Erosion control to protect slopes.
f. Protection of storm drain inlets (gravel bags or catch basin inserts). g. Perimeter sediment control (perimeter silt fence, fiber rolls). h. Sediment trap or sediment basin to retain sediment on site. i. Stabilized construction exits.
j. Wind erosion control.
k. Other soil loss BMPs acceptable to the enforcing agency.

2. Good housekeeping BMPs to manage construction equipment, materials, non-stormwater discharges and wastes that should be considered for implementation as appropriate for each project include, but are not limited to, the following:
a. Dewatering activities.
b. Material handling and waste management.
c. Building materials stockpile management.
d. Management of washout areas (concrete, paints, stucco, etc.). e. Control of vehicle/equipment fueling to contractor's staging area. f. Vehicle and equipment cleaning performed off site.
g Spill prevention and control.
h. Other housekeeping BMPs acceptable to the enforcing agency.

DIVISION 5.2 ENERGY EFFICIENCY
SECTION 5.201 GENERAL

5.201.1 Scope [BSC-CG]. California Energy Code [DSA-SS]. For the purposes of mandatory energy efficiency standards in this code, the California Energy Commission will continue to adopt mandatory building standards.

DIVISION 5.3 WATER EFFICIENCY AND CONSERVATION
SECTION 5.301 GENERAL

5.301.1 Scope. The provisions of this chapter shall establish the means of conserving water use indoors, outdoors and in wastewater conveyance.

SECTION 5.302 DEFINITIONS

5.302.1 Definitions. The following terms are defined in Chapter 2 (and are included here for reference) EVAPOTRANSPIRATION ADJUSTMENT FACTOR (ETAF) [DSA-SS]. An adjustment factor when applied to reference evapotranspiration that adjusts for plant factors and irrigation efficiency, which ae two major influences on the amount of water that needs to be applied to the landscape.

FOOTPRINT AREA [DSA-SS]. The total area of the furthest exterior wall of the structure projected to natural grade, not including exterior areas such as stairs, covered walkways, patios and decks.

METERING FAUCET. A self-closing faucet that dispenses a specific volume of water for each actuation cycle. The volume or cycle duration can be fixed or adjustable.

GRAYWATER. Pursuant to Health and Safety Code Section 17922.12, "graywater" means untreated wastewater that has not been contaminated by any toilet discharge, has not been affected by infectious, contaminated, or unhealthy bodily wastes, and does not present a threat from contamination by unhealthful processing, manufacturing, or operating wastes. "Graywater" includes, but is not limited to wastewater from bathtubs, showers, bathroom washbasins, clothes washing machines and laundry tubs, but does not include waste water from kitchen sinks or dishwashers.

MODEL WATER EFFICIENT LANDSCAPE ORDINANCE (MWELO). The California ordinance regulating landscape design, installation and maintenance practices that will ensure commercial, multifamily and other developer installed landscapes greater than 2500 square feet meet an irrigation water budget developed based on landscaped area and climatological parameters.

MODEL WATER EFFICIENT LANDSCAPE ORDINANCE (MWELO). [HCD] The California model ordinance (California Code of Regulations, Title 23, Division 2, Chapter 2.7), regulating landscape design, installation and maintenance practices. Local agencies are required to adopt the updated MWELO, or adopt a local ordinance at least as effective as the MWELO.

POTABLE WATER. Water that is drinkable and meets the U.S. Environmental Protection Agency (EPA) Drinking Water Standards. See definition in the California Plumbing Code, Part 5.

POTABLE WATER. [HCD] Water that is satisfactory for drinking, culinary, and domestic purposes, and meets the U.S. Environmental Protection Agency (EPA) Drinking Water Standards and the requirements of the Health Authority Having Jurisdiction.

RECYCLED WATER. Water which, as a result of treatment of waste, is suitable for a direct beneficial use or a controlled use that would not otherwise occur [Water Code Section 13050 (n)]. Simply put, recycled water is water treated to remove waste matter attaining a quality that is suitable to use the water again.

SUBMETER. [HCD 1] A secondary device beyond a meter that measures water consumption of an individual rental unit within a multiunit residential structure or mixed-use residential and commercial structure. (See Civic Code Section 1954.202 (g) and Water code Section 517 for additional details.) WATER BUDGET. Is the estimated total landscape irrigation water use which shall not exceed the maximum applied water allowance calculated in accordance with the Department of Water Resources Model Efficient Landscape Ordinance (MWELO).

5.106.5.3 Electric vehicle (EV) charging. [N] Construction to provide electric vehicle infrastructure and facilitate electric vehicle charging shall comply with Section 5.106.5.3.1 and shall be provided in accordance with regulations in the California Building Code and the California Electrical Code.

Exceptions:

1. On a case-by-case basis where the local enforcing agency has determined compliance with this section is not feasible based upon one of the following conditions:
a. Where there is no local utility power supply
b. Where the local utility is unable to supply adequate power. c. Where there is evidence suitable to the local enforcement agency substantiating the local utility infrastructure design requirements, directly related to the implementation of Section 5.106.5.3, may adversely impact the construction cost of the project.

2. Parking spaces accessible only by automated mechanical car parking systems are not required to comply with this code section

5.106.5.3.1 EV capable spaces.
[N] EV capable spaces shall be provided in accordance with Table 5.106.5.3.1 and the following requirements:

1. Raceways complying with the California Electrical Code and no less that 1-inch (25 mm) diameter shall be provided and shall originate at a service panel or a subpanel(s) serving the area, and shall terminate in close proximity to the proposed location of the EV capable and into a suitable listed cabinet, box,enclosure or equivalent. A common raceway may be used to serve multiple EV charging spaces.

2. A service panel or subpanel (s) shall be provided with panel space and electrical load capacity for a dedicated 208/240 volt, 40-ampere minimum branch circuit for each EV capable space, with delivery of 30-ampere minimum to an installed EVSE at each EVCS.

3. The electrical system and any on-site distribution transformers shall have sufficient capacity to supply full rated amperage at each EV capable space.

4. The service panel or subpanel circuit directory shall identify the reserved overcurrent protective devices space(s) as "EV CAPABLE". The raceway termination location shall be permanently and visibly marked as "EV CAPABLE."
Note: A parking space served by electric vehicle supply equipment or designed as a future EV charging space shall count as at least one standard automobile parking space only for the purpose of complying with any applicable minimum parking space requirements established by an enforcement agency. See vehicle Code Section 22511.2 for further details.

ABBREVIATION DEFINITIONS:

HCD Department of Housing and Community Development
BSC California Building Standards Commission
DSA-SS Division of the State Architect, Structural Safety OSHPD Office of Statewide Health Planning and Development LR Low Rise
HR High Rise
AA Additions and Alterations
N New

5.106.4.1.2 Long-term bicycle parking. For new buildings with tenant spaces that have 10 or more tenant-occupants, provide secure bicycle parking for 5 percent of the tenant-occupant vehicular parking spaces with a minimum of one bicycle parking facility.

5.106.4.1.3 For additions or alterations that add 10 or more tenant-occupant vehicular parking spaces, provide secure bicycle parking for 5 percent of the tenant vehicular parking spaces being added, with a minimum of one bicycle parking facility.

5.106.4.1.4 For new shell buildings in phased projects provide secure bicycle parking for 5 percent of the anticipated tenant-occupant vehicular parking spaces with a minimum of one bicycle parking facility.

5.106.4.1.5 Acceptable bicycle parking facility for Sections 5.106.4.1.2, 5.106.4.1.3, and 5.106.4.1.4 shall be convenient from the street and shall meet one of the following:

1. Covered, lockable enclosures with permanently anchored racks for bicycles;

2. Lockable bicycle rooms with permanently anchored racks; or

3. Lockable, permanently anchored bicycle lockers.

Note: Additional information on recommended bicycle accommodations may be obtained from Sacramento Area Bicycle Advocates.

5.106.4.2 Bicycle parking. [DSA-SS] For public schools and community colleges, comply with Sections

5.106.4.2.1 and 5.106.4.2.2

5.106.4.2.1 Student bicycle parking. Provide permanently anchored bicycle racks conveniently accessed with a minimum of four two-bike capacity racks per new building.

5.106.4.2.2 Staff bicycle parking. Provide permanent, secure bicycle parking conveniently accessed with a minimum of two staff bicycle parking spaces per new building. Acceptable bicycle parking facilities shall be convenient from the street or staff parking area and shall meet one of the following:

1. Covered, lockable enclosures with permanently anchored racks for bicycles;

2. Lockable bicycle rooms with permanently anchored racks; or

3. Lockable, permanently anchored bicycle lockers.

5.106.4 BICYCLE PARKING. For buildings within the authority of California Building Standards Commission as specified in Section 103, comply with Section 5.106.4.1. For buildings within the authority of the Division of the State Architect pursuant to Section 105, comply with Section 5.106.4.2

5.106.4.1 Bicycle parking. [BSC-CG] Comply with Sections 5.106.4.1.1 and 5.106.4.1.2; or meet the applicable local ordinance, whichever is stricter.

5.106.4.1.1 Short-term bicycle parking. If the new project or an addition or alteration is anticipated to generate visitor traffic, provide permanently anchored bicycle racks within 200 feet of the visitors' entrance, readily visible to passers-by, for 5% of new visitor motorized vehicle parking spaces being added, with a minimum of one two-bike capacity rack.

Exception: Additions or alterations which add nine or less visitor vehicular parking spaces.

CHAPTER 3

GREEN BUILDING
SECTION 301 GENERAL
301.1 SCOPE. Buildings shall be designed to include the green building measures specified as mandatory in the application checklists contained in this code. Voluntary green building measures are also included in the application checklists and may be included in the design and construction of structures covered by this code, but are not required unless adopted by a city, county, or city and county as specified in Section 101.7. 301.3 NONRESIDENTIAL ADDITIONS AND ALTERATIONS. [BSC-CG] The provisions of individual sections of Chapter 5 apply to newly constructed buildings, building additions of 1,000 square feet or greater, and/or building alterations with a permit valuation of $200,000 or above (for occupancies within the authority of California Building Standards Commission). Code sections relevant to additions and alterations shall only apply to the portions of the building being added or altered within the scope of the permitted work.

A code section will be designated by a banner to indicate where the code section only applies to newly constructed buildings [N] or to additions and/or alterations [A]. When the code section applies to both, no banner will be used.
301.3.1 Nonresidential additions and alterations that cause updates to plumbing fixtures only:

Note: On and after January 1, 2014, certain commercial real property, as defined in Civil Code Section 1101.3, shall have its noncompliant plumbing fixtures replaced with appropriate water-conserving plumbing fixtures under specific circumstances. See Civil Code Section 1101.1 et seq. for definitions, types of commercial real property affected, effective dates, circumstances necessitating replacement of noncompliant plumbing fixtures, and duties and responsibilities for ensuring compliance.
301.3.2 Waste Diversion. The requirements of Section 5.408 shall be required for additions and alterations whenever a permit is required for work.
301.4 PUBLIC SCHOOLS AND COMMUNITY COLLEGES. (see GBSC) 301.5 HEALTH FACILITIES. (see GBSC)
SECTION 302 MIXED OCCUPANCY BUILDINGS
302.1 MIXED OCCUPANCY BUILDINGS. In mixed occupancy buildings, each portion of a building shall comply with the specific green building measures applicable to each specific occupancy.

SECTION 303 PHASED PROJECTS
303.1 PHASED PROJECTS. For shell buildings and others constructed for future tenant improvements, only those code measures relevant to the building components and systems considered to be new construction (or newly constructed) shall apply.
303.1.1 Initial Tenant improvements. The provisions of this code shall apply only to the initial tenant improvements to a project. Subsequent tenant improvements shall comply with the scoping provisions in Section 301.3 non-residential additions and alterations.

5.106.5.3.3 Use of automatic load management systems (ALMS).

ALMS shall be permitted for EVCS. When ALMS is installed, the required electrical load capacity specified in Section

5.106.5.3.1 for each EVCS may be reduced when serviced by an EVSE controlled by an ALMS. Each EVSE controlled by an ALMS shall deliver a minimum 30 amperes to an EV when charging one vehicle and shall deliver a minimum 3.3 kW while simultaneously charging multiple EVs.

5.106.5.3.4 Accessible EVCS.

When EVSE is installed, accessible EVSC shall be provided in accordance with the California Building Code, Chapter 11B, Section 11B-228.3.

Note: For EVCS signs, refer to Caltrans Traffic Operations Policy Directive 13-01 (Zero Emission Vehicle Signs and Pavement Markings) or its successor(s).

5.106.5.4 Electric Vehicle (EV) charging: medium-duty and heavy-duty. [N] Construction shall comply with section 5.106.5.4.1 to facilitate future installation of electric vehicle supply equipment (EVSE). Construction for warehouses, grocery stores and retail stores with planned off-street loading spaces shall also comply with Section 5.106.5.4.1 for future installation of medium- and heavy-duty EVSE.

Exceptions:

1. On a case-by-case basis where the local enforcing agency has determined compliance with this section is not feasible based upon one of the following conditions:
a. Where there is no local utility power supply.
b. Where the local utility is unable to supply adequate power. c. Where there is evidence suitable to the local enforcing agency substantiating that additional local utility infrastructure design requirements, directly related to the implementation of Section 5.106.5.3, may adversely impact the construction cost of the project.

When EVSE(s) is/are installed, it shall be in accordance with the California Building Code, the California Electrical Code and as follows:

5.106.5.4.1 Electric vehicle charging readiness requirements for warehouse, grocery stores and retail stores with planned off-street loading spaces.
[N] In order to avoid future demolition when adding EV charging supply and distribution equipment, spare raceways(s) or busway(s) and adequate capacity for transformers(s), service panels(s) or subpanel(s) shall be installed at the time of construction in accordance with the California Electrical Code. Construction plans and specifications shall include but are not limited to, the following:

1. The transformer, main service equipment and subpanel shall meet the minimum power requirement in Table 5.106.5.4.1 to accommodate the dedicated branch circuits for the future installation of EVSE.

2. The construction documents shall indicate on or more location(s) convenient to the planned offstreet loading space(s) reserved for medium-and heavy-duty ZEV charging cabinets and charging dispensers, and a pathway reserved for routing of conduit from the termination of the raceway(s) or busway(s) to the charging cabinet(s) and dispenser(s) as shown in Table

5.106.5.4.1

3. Raceway(s) or busway(s) originating at a main service panel or a subpanel(s) serving the area where potential future medium-and heavy-duty EVSE will be located and shall terminate in close proximity to the potential future location of the charging equipments for medium- and heavy-duty vehicles.

4. The raceway(s) or busway(s) shall be sufficient size to carry the minimum additional system load to the future location of the charging for medium- and heavy-duty ZEVs as shown in Table

5.106.5.4.1.

TABLE 5.106.5.3.1

TOTAL NUMBER OF ACTUAL

PARKING SPACES

NUMBER OF REQUIRED EV

CAPABLE SPACES

NUMBER OF EVCS (EV

CAPABLE SPACES
PROVIDED WITH EVSE)^2
0-9 0 0
10-25 2 0
26-50 8 2
51-75 13 3
76-100 17 4
101-150 25 6
151-200 35 9
201 AND OVER 20% of total¹ 25% of EV capable spaces¹

5.106.8 LIGHT POLLUTION REDUCTION. [N]. l Outdoor lighting systems shall be designed and installed to comply with the following:

1. The minimum requirements in the California Energy Code for Lighting Zones 0-4 as defined in Chapter 10, Section 10-114 of the California Administrative Code; and

2. Backlight (B) ratings as defined in IES TM-15-11 (shown in Table A-1 in Chapter 8);

3. Uplight and Glare ratings as defined in California Energy Code (shown in Tables 130.2-A and 130.2-B in Chapter 8) and

4. Allowable BUG ratings not exceeding those shown in Table 5.106.8, [N] or Comply with a local ordinance lawfully enacted pursuant to Section 101.7, whichever is more stringent.

Exceptions: [N]

1. Luminaires that qualify as exceptions in Sections 130.2 (b) and 140.7 of the California Energy Code.

2. Emergency lighting.

3. Building facade meeting the requirements in Table 140.7-B of the California Energy Code, Part 6.

4. Custom lighting features as allowed by the local enforcing agency, as permitted by Section 101.8 Alternate materials, designs and methods of construction.

5. Luminaires with less than 6,200 initial luminaire lumens.

TABLE 5.106.8 [N] MAXIMUM ALLOWABLE BACKLIGHT,
UPLIGHT AND GLARE (BUG) RATINGS 1,2

ALLOWABLE RATING

LIGHTING
ZONE
LZ0

LIGHTING
ZONE LZ1

LIGHTING
ZONE LZ2

LIGHTING
ZONE LZ3

LIGHTING
ZONE LZ4

MAXIMUM ALLOWABLE
BACKLIGHT RATING 3 Luminaire greater than 2
mounting heights (MH) from
property line
N/A No Limit No Limit No Limit No Limit
Luminaire back hemisphere is
1-2 MH from property line N/A B2 B3 B4 B4
Luminaire back hemisphere is

0.5-1 MH from property line N/A B1 B2 B3 B3
Luminaire back hemisphere is
less than 0.5 MH from property
line
N/A B0 B0 B1 B2

MAXIMUM ALLOWABLE

UPLIGHT RATING (U)
For area lighting 3 N/A U0 U0 U0 U0
For all other outdoor
lighting,including decorative
luminaires
N/A U1 U2 U3 UR
DISCLAIMER:THIS DOCUMENT IS PROVIDED AND INTENDED TO BE USED AS A MEANS TO INDICATE AREAS OF COMPLIANCE WITH THE CALIFORNIA GREEN BUILDING STANDARDS (CALGREEN) CODE. DUE TO THE VARIABLES BETWEEN BUILDING DEPARTMENT JURISDICTIONS, THIS CHECKLIST IS TO BE USED ON AN INDIVIDUAL PROJECT BASIS AND MAY BE MODIFIED BY THE END USER TO MEET THOSE INDIVIDUAL NEEDS. THE END USER ASSUMES ALL RESPONSIBILITY ASSOCIATED WITH THE USE OF THIS DOCUMENT, INCLUDING VERIFICATION WITH THE FULL CODE.

5.106.2 STORMWATER POLLUTION PREVENTION FOR PROJECTS THAT DISTURB ONE OR MORE ACRES OF LAND. Comply with all lawfully enacted stormwater discharge regulations for projects that (1) disturb one acre or more of land, or (2) disturb less than one acre of land but are part of a larger common plan of development sale.

Note: Projects that (1) disturb one acre or more of land, or (2) disturb less than one acre of land but are part of the larger common plan of development or sale must comply with the post-construction requirements detailed in the applicable National Pollutant Discharge Elimination System (NPDES) General permit for Stormwater Discharges Associated with Construction and Land Disturbance Activities issued by the State Water Resources Control Board or the Lahontan Regional Water Quality Control Board (for projects in the Lake Tahoe Hydrologic Unit).

The NPDES permits require postconstruction runoff (post-project hydrology) to match the preconstruction runoff (pre-project hydrology) with the installation of postconstruction stormwater management measures. The NPDES permits emphasize runoff reduction through on-site stormwater use, interception, evapotranspiration, and infiltration through nonstructural controls, such as Low Impact Development (LID) practices, and conversation design measures.

Stormwater volume that cannot be addressed using nonstructural practices is required to be captured in structural practices and be approved by the enforcing agency.

Refer to the current applicable permits on the State Water Resources Control Board website at:
www.waterboards.ca.gov/constructionstormwater. Consideration to the stormwater runoff management measures should be given during the initial design process for appropriate integration into site development.

N/A Y N/A

1. Where there is insufficient electrical supply.

2. The number of required EVCS (EV capable spaces provided with EVSE) in column 3 count towards the total number of required EV capable spaces shown in column 2.

5.106.5.3.2 Electric vehicle charging stations (EVCS)
EV capable spaces shall be provided with EVSE to create EVCS in the number indicated in Table

5.106.5.3.1. The EVCS required by Table 5.106.5.3.1 may be provided with EVSE in any combination of Level 2 and Direct Current Fast Charging (DCFC), except that at least one Level 2 EVSE shall be provided.

One EV charger with multiple connectors capable of charging multiple EVs simultaneously shall be permitted if the electrical load capacity required by Section 5.106.5.3.1 for each EV capable space is accumulatively supplied to the EV charger.

The installation of each DCFC EVSE shall be permitted to reduce the minimum number of required EV capable spaces without EVSE by five and reduce proportionally the required electrical load capacity to the service panel or subpanel.

Y N/A Y N/A
Y = YES
N/A = NOT APPLICABLE
RESPON. PARTY = RESPONSIBLE PARTY (ie: ARCHITECT, ENGINEER, OWNER, CONTRACTOR, INSPECTOR ETC.)
RESPON. PARTY RESPON. PARTY RESPON. PARTY RESPON. PARTY

5.106.8.1 Facing- Backlight
Luminaries within 2MH of a property line shall be oriented so that the nearest property line is behind the fixture, and shall comply with the backlight rating specified in Table 5.106.8 based on the lighting zone and distance to the nearest point of that property line.

Exception: Corners. If two property lines (or two segments of the same property line) have equidistant point to the luminaire, then the luminaire may be oriented so that the intersection of the two lines (the corner) is directly behind the luminaire. The luminaire shall still use the distance to the nearest points(s) on the property lines to determine the required backlight rating.

5.106.8.2 Facing-Glare.

For luminaires covered by 5.106.8.1, if a property line also exists within or extends into the front hemisphere within 2MH of the luminaire then the luminaire shall comply with the more stringent glare rating specified in Table

5.106.8 based on the lighting zone and distance to the nearest point on the nearest property line within the front hemisphere.

Note: [N]

1.See also California Building Code, Chapter 12, Section 1205.6 for college campus lighting requirements for parking facilities and walkways.

2.Refer to Chapter 8 (Compliance Forms, Worksheets and Reference Material) for IES TM-15-11 Table A-1, California Energy Code Tables 130.2-A and 130.2-B.

3. Refer to the California Building Code for requirements for additions and alterations.

5.106.10 GRADING AND PAVING. Construction plans shall indicate how site grading or a drainage system will manage all surface water flows to keep water from entering buildings. Examples of methods to manage surface water include, but are not limited to, the following:

1. Swales.

2. Water collection and disposal systems.

3. French drains.

4. Water retention gardens.

5. Other water measures which keep surface water away from buildings and aid in groundwater recharge.

Exception: Additions and alterations not altering the drainage path.

5.106.12 SHADE TREES [DSA-SS]. Shade Trees shall be planted to comply with Sections 5.106.12.1, 5.106.12.2, and 5.106.12.3. Percentages shown shall be measured at noon on the summer solstice. Landscape irrigation necessary to establish and maintain tree health shall comply with Section 5.304.6.

5.106.12.1 Surface parking areas. Shade tree plantings, minimum #10 container size or equal, shall be installed to provide shade over 50 percent of the parking area within 15 years.

Exceptions: Surface parking area covered by solar photovoltaic shade structures with roofing materials that comply with Table A5.106.11.2.2 in Appendix A5 shall be permitted in whole or in part in lieu of shade tree planting.

5.106.12.2 Landscape areas. Shade tress plantings, minimum #10 container size or equal shall be installed to provide shade of 20% of the landscape area within 15 years.

Exceptions: Playfields for organized sport activity are not included in the total area calculation.

5.106.12.3. Hardscape areas. Shade tree plantings, minimum #10 container size or equal shall be installed to provide shade over 20 percent of the hardscape area within 15 years.

Exceptions:

1. Walks, hardscape areas covered by solar photovoltaic shade structures or shade structures with roofing materials that comply with Table A5.106.11.2.2 in Appendix A5 shall be permitted in whole or in part in lieu of shade tree planting.

2. Designated and marked play areas of organized sport activity are not included in the total area calculation.

TABLE 5.106.5.4.1 RACEWAY CONDUIT AND PANEL POWER
REQUIREMENTS FOR MEDIUM- AND HEAVY-DUTY EVSE [N]
BUILDING TYPE BUILDING SIZE (SQ. FT.)

NUMBER OF

OFF-STREET

LOADING SPACES

ADDITIONAL

CAPACITY

REQUIRED (KVA)

FOR RACEWAY &

BUSWAY AND

TRANSFORMER &
PANEL
Grocery
10,000 to 90,000
1 or 2 200
3 or Greater 400
Greater than 90,000 1 or Greater 400
Retail
10,000 to 135,000
1 or 2 200
3 or Greater 400
Greater than 135,000 1 or Greater 400
Warehouse
20,000 to 256,000
1 or 2 200
3 or Greater 400
Greater than 256,000 1 or Greater 400

MAXIMUM ALLOWABLE
GLARE RATING 5 (G)

MAXIMUM ALLOWABLE
GLARE RATING 5 (G) N/A G1 G2 G3 G4

MAXIMUM ALLOWABLE
GLARE RATING 5 (G) N/A G0 G1 G1 G2

MAXIMUM ALLOWABLE
GLARE RATING 5 (G) N/A G0 G0 G1 G1

MAXIMUM ALLOWABLE
GLARE RATING 5 (G) N/A G0 G0 G0 G1

1. IESNA Lighting Zones 0 and 5 are not applicable; refer to Lighting Zones as defined in the California Energy Code and Chapter 10 of the Callifornia Administrative Code.

2. For property lines that abut public walkways, bikeways, plazas and parking lots, the property line may be considered to be 5 feet beyond the actual property line for purpose of determining compliance with this section. For property lines that abut public roadways and public transit corridors, the property line may be considered to be the centerline of the public roadway or public transit corridor for the purpose of determining compliance with this section.

3. General lighting luminaires in areas such as outdoor parking, sales or storage lots shall meet these reduced ratings. Decorative luminaries located in these areas shall meet U-value limits for "all other outdoor lighting" Y
N/A
N/A
N/A
Y
Y
Y
CLIENT:

PROJECT:

REVISIONS DATE

ISSUE DATE
DRAWN :

CHECKED :

SCALE: :

SHEET TITLE:

SHEET
OF SHEETS FUHRMAN LEAMY LAND GROUP HEREBY EXPRESSLY RESERVES ITS COMMON LAW COPYRIGHT AND OTHER PROPERTY RIGHTS IN THESE PLANS. THESE PLANS AND DRAWINGS ARE NOT TO BE REPRODUCED, CHANGED OR COPIED IN ANY FORM OR MANNER WHATSOEVER WITHOUT FIRST OBTAINING THE EXPRESS WRITTEN PERMISSION OF FUHRMAN LEAMY LAND GROUP. NOR ARE THEY TO BE ASSIGNED TO ANY THIRD PARTY WITHOUT FIRST OBTAINING WRITTEN PERMISSION AND CONSENT. 1 2
3 4
5 JOB NO. :

KCL

FUHRMAN LEAMY

LAND GROUP
DESIGN ¥ SERVICE ¥ SOLUTIONS
CRV: 25027
JM-52 PARK
5097 MISTY RIDGE DRIVE

ROSEVILLE, CA

CITY OF ROSEVILLE
30 CITY OF ROSEVILLE APPROVAL
3400 DOUGLAS BLVD, SUITE 275
ROSEVILLE, CALIFORNIA 95661
916.783.5263 • FLLANDGROUP.COM
R

EG ISTERED LANDSCAPE ARCH I T
E
C
T

STATE OF CAL I FORN IA
KEV I N C . LEAM
No. 4965 Y
12/31/26
Signature Renewal Date Date 1.15.2026

FOR COUNCIL ONLY - NOT FOR CONSTRUCTION

Page 1204 of 1714 ends