ADJOURNMENT
The meeting was adjourned at 9:44 p.m.

A motion was made by Commissioner Leung, seconded by
Vice Chair Romano to adjourn the meeting.

Aye: Commissioner Celso, Commissioner Kirby, Commissioner Leung, Vice Chair Romano, Commissioner Stocks, and Chair Vargas-Smith 6 -
Excused: 1 - Commissioner Inciarte
The next regular scheduled meeting is Thursday, January 4, 2024

MEETING DISCLOSURES
City of Santa Clara Page 5 Printed on 12/20/2023
Historical & Landmarks Commission Meeting Minutes 12/07/2023 The time limit within which to commence any lawsuit or legal challenge to any quasi-adjudicative decision made by the City is governed by Section 1094.6 of the Code of Civil Procedure, unless a shorter limitation period is specified by any other provision. Under Section 1094.6, any lawsuit or legal challenge to any quasi-adjudicative decision made by the City must be filed no later than the 90th day following the date on which such decision becomes final. Any lawsuit or legal challenge, which is not filed within that 90-day period, will be barred. If a person wishes to challenge the nature of the above section in court, they may be limited to raising only those issues they or someone else raised at the meeting described in this notice, or in written correspondence delivered to the City of Santa Clara, at or prior to the meeting. In addition, judicial challenge may be limited or barred where the interested party has not sought and exhausted all available administrative remedies.

If a member of the public submits a speaker card for any agenda items, their name will appear in the Minutes. If no speaker card is submitted, the Minutes will reflect "Public Speaker."
In accordance with the requirements of Title II of the Americans with Disabilities Act of 1990 ("ADA"), the City of Santa Clara will not discriminate against qualified individuals with disabilities on the basis of disability in its services, programs, or activities, and will ensure that all existing facilities will be made accessible to the maximum extent feasible. The City of Santa Clara will generally, upon request, provide appropriate aids and services leading to effective communication for qualified persons with disabilities including those with speech, hearing, or vision impairments so they can participate equally in the City’s programs, services, and activities. The City of Santa Clara will make all reasonable modifications to policies and programs to ensure that people with disabilities have an equal opportunity to enjoy all of its programs, services, and activities.

Agendas and other written materials distributed during a public meeting that are public record will be made available by the City in an appropriate alternative format.

Contact the City Clerk’s Office at 1 408-615-2220 with your request for an alternative format copy of the agenda or other written materials.

Individuals who require an auxiliary aid or service for effective communication, or any other disability-related modification of policies or procedures, or other accommodation, in order to participate in a program, service, or activity of the City of Santa Clara, should contact the City’s ADA Coordinator at 408-615-3000 as soon as possible but no later than 48 hours before the scheduled event.

City of Santa Clara Page 6 Printed on 12/20/2023
1 of 16
1957 Pruneridge Avenue – Rezone Conditions of Approval
PLN2022-00505

REZONING CONDITIONS OF APPROVAL

GENERAL
G1. If relocation of an existing public facility becomes necessary due to a conflict with the developer's new improvements, then the cost of said relocation shall be borne by the developer.

G2. Comply with all applicable codes, regulations, ordinances and resolutions.

ATTORNEY’S OFFICE
A1. The Developer agrees to defend and indemnify and hold City, its officers, agents, employees, officials and representatives free and harmless from and against any and all claims, losses, damages, attorneys' fees, injuries, costs, and liabilities arising from any suit for damages or for equitable or injunctive relief which is filed by a third party against the City by reason of its approval of developer's project.

COMMUNITY DEVELOPMENT

BUILDING DIVISION
B1. Prior to overall construction permit application, submit to the Santa Clara Building Division, 2 copies of an addressing diagram request, to be prepared by a licensed architect or engineer. The addressing diagram(s) shall include all proposed streets and all building floor plans. The addressing diagram(s) shall conform to Santa Clara City Manager Directive #5; Street Name and Building Number Changes, and Santa Clara Building Division Address Policy For Residential and Commercial Developments. The addressing diagram(s) shall indicate all unit numbers to be based off established streets, not alleys nor access-ways to garages. Allow a minimum of 10 working days for initial staff review. Please note city staff policy that existing site addresses typically are retired.

Provide digital pdf printed from design software, not scanned from printed paper sheet. a. Any building or structure that is demolished shall have its address retired and a new address/s shall be issued for the project.

B2. The construction permit application drawings submitted to the Santa Clara Building Division shall include a copy of the latest Federal Emergency Management Agency (FEMA) Flood Zone Map: https://msc.fema.gov/portal/home. The project drawings shall indicate how the project complies with the Santa Clara Flood Damage Prevention Code. a. FEMA Flood Zone map designations and requirements are based on the map in effect at date of Building Permit issuance.

B3. The construction permit application drawings submitted to the Santa Clara Building Division shall include Santa Clara Valley Urban Runoff Pollution Prevention Program Low Impact Development (LID) practices http://www.scvurppp-w2k.com/nd_wp.shtml .

All projects that disturb more than one acre, or projects that are part of a larger development that in total disturbs more than one acre, shall comply with the Santa Clara Valley Urban Runoff Pollution Prevention Program Best Management Practices (BMP):
http://www.scvurppp-w2k.com/construction_bmp.shtml, and shall provide a Storm Water Pollution Prevention Plan (SWPPP) by a certified Qualified SWPPP Developer (QSD).

All site drainage and grading permit applications submitted to the Santa Clara Building Division shall include a city of Santa Clara "C3" data form, available on this web page  https://www.santaclaraca.gov/our-city/departments-g-z/publicworks/environmental-programs/stormwater-pollution-prevention and will be routed to a contract consultant for review.

B4. No construction code review or analysis is being done at this time. The construction permit application drawings submitted to the Santa Clara Building Division shall include an overall California Building Code analysis, including; proposed use and occupancy of 2 of 16
1957 Pruneridge Avenue – Rezone Conditions of Approval
PLN2022-00505
all spaces ( CBC Ch. 3), all building heights and areas (CBC Ch. 5), all proposed types of construction (CBC Ch. 6), all proposed fire and smoke protection features, including all types of all fire rated penetrations proposed (CBC Ch. 7), all proposed interior finishes fire resistance (CBC Ch. 8), all fire protection systems proposed (CBC Ch. 9), and all means of egress proposed (CBC Ch. 10). Noncombustible exterior wall, floor, and roof finishes are strongly encouraged.
 During construction retaining a single company to install all fire rated penetrations is highly recommended.
 The grade level lobbies shall be minimum1 hour rated all sides and above.  All stair shafts shall be minimum 1 hour rated.
 All elevator shafts shall be minimum 1 hour rated.
 All trash chute shafts shall be minimum 1 hour rated.  Recommendation: provide a minimum of two trash chutes; one for recyclables, one for trash, each trash chute to be routed down to a grade level trash collection room.
 Any trash rooms shall be minimum 1 hour rated all sides and above.

B5. The overall project construction permit application shall include the geotechnical, architectural, structural, energy, electrical, mechanical, and plumbing drawings and calculations. Prior to the issuance of the overall project construction permit, a conditions of approval review meeting must be held in city hall, which meeting must be attended by the on-site field superintendent(s). The meeting will not be held without the attendance of the on-site field superintendent(s). The on-site grading permit shall be a separate permit application to the Building Division.

B6. Temporary Certificates of Occupancy (TCO) will not be routinely issued and will be considered on a very limited basis only when there is a clear and compelling reason for city staff to consider a TCO. A TCO will be approved only after all applicable City staff have approved in writing; Planning, Public .Works / Engineering, Fire Prevention, Santa Clara Water, Silicon Valley Power, and any other applicable agencies such as the Santa Clara County Health Dept., with the Building Division being the final approval of all TCO.'s.

B7. See Title 15 of the Santa Clara City Code for any amendments to the California Building Codes.

B8. This project is subject to the provisions of the City of Santa Clara 2022 Reach Code, effective January 2022 See Ordinance No. 2034 and/or Title 15 of the Santa Clara City Code.
 Chp. 15.36 – Energy Code for “all electric” provisions for new construction.  Chp. 15.38 – Green Building Code for additional Electric Vehicle Charging requirements for new construction.

HOUSING & COMMUNITY SERVICES DIVISION
H1. In accordance with the Santa Clara City Code chapter 17.40, this project is subject to the affordable housing requirements and impact fee for the proposed 22 units for-sale residential development. The Applicant shall provide not less than fifteen percent (15%) of the units (or 3.3 units) to affordable households made available at affordable sales prices to extremely low, very low, low and/or moderate-income households as long as the distribution of affordable units averages to a maximum of one-hundred (100) percent of Area Median Income. All prices are set in accordance with the City’s Below Market Purchase (BMP) Program Policies and Procedures Manual (subject to updates and changes). Applicant shall be responsible for cost incurred under the Building Energy Efficiency Standards – Title 24 for the each affordable for- sale residential unit.

Additionally, where the calculation of affordable housing requirements results in a -
3 of 16
1957 Pruneridge Avenue – Rezone Conditions of Approval
PLN2022-00505
fractional unit, the Applicant shall either pay an In-Lieu Fee or the Applicant shall provide an additional unit to satisfy the requirement. Any in-lieu fee payment due to the City by the Applicant shall be payable prior to the issuance of the certificate of occupancy. The in-lieu fee amount shall be equal to the difference between the unrestricted appraised market value ("Initial Market Value") and the Affordable Sales Price of one of the BMP units at completion, multiplied by the fractional unit. The Initial Market Value of the last BMP unit sold shall be the basis for calculating the in-lieu fee to be paid by Applicant.

H2. Prior to issuance of Building Permits, the Developer shall enter into an Affordable Housing Agreement (AHA) with the City that will determine the Affordable Sales Price for the Affordable Units at Lot 14, 15 and 22, and apply all terms and covenants guaranteeing the prescribed affordability. Satisfaction of the affordable housing obligation shall be memorialized in the AHA and subject to City Council approval. There will be a fee for the preparation of the AHA in the amount of $4,020 which will be due prior to execution of the AHA. Please note all fees are based on the current Municipal Fee Schedule in effect at the time the project is approved

PLANNING DIVISION
P1. Submit plans for final architectural review to the Planning Division for Architectural Committee review and approval prior to issuance of building permits. Said plans to include, but not be limited to: site plans, floor plans, elevations, landscaping, irrigation plan, signage, and stormwater management plan.

P2. The Developer must provide third party verification of the stormwater management plan for conformance with C3 requirements as part of the architectural submittal.

P3. Submit complete landscape plans, including irrigation plan and composite utility and tree layout overlay plan, for Planning Department review and approval with installation of required landscaping prior to the issuance of occupancy and or final building permits.

Landscape plan to include type and size of proposed trees. Type and size of tree replacement on project site shall be at the direction of the City Arborist and require Planning review and approval. Coordinate with the Street Department and City Arborist for the type, location, installation and maintenance of street trees fronting the project site along the public right-of-way. Installation of root barriers and super-soil may be required with the installation of trees where electric, water, and sewer utilities are in proximity.

P4. The overlay plan is to show the location of all utilities, storm drains, catch basins, sewer mains, joint trenches, building footprints, driveways, walkways, and trees. Trees are required to be 10 feet from public water, storm and sewer facilities unless a City approved Tree Root Barrier (TRB) is used. If a City approved TRB is used the TRB must be a minimum of five feet from the public water, storm and sewer facility with the tree behind the TRB and specified on the plan. Landscaping installation shall meet City water conservation criteria in a manner acceptable to the Director of Planning and Inspection.

P5. Developer shall construct a complete street section along the project frontage of Pruneridge Avenue to include a 5-foot landscape strip with 4.5-feet of clear planting width and a 5-foot sidewalk behind the landscape strip. The landscape strip is to include trees (minimum 24-inch box) and drought tolerant plantings.

P6. Submit as-built on-site plans prepared by a registered civil engineer showing all utilities serving the subject property.

P7. Obtain required permits and inspections from the Building Official and comply with the conditions thereof. As this project involves land area of one acre or more, the Developer shall file a Notice of Intent (NOI) with the State Water Resources Control Board prior to issuance of any building permit for grading, or construction; a copy of the NOI shall be sent to the City Building Inspection Division. A stormwater pollution prevention plan is also required with the NOI.
4 of 16
1957 Pruneridge Avenue – Rezone Conditions of Approval
PLN2022-00505
P8. The Developer shall submit a truck hauling route for demolition, soil, debris and material removal, and construction to the Director of Community Development for review and approval prior to the issuance of demolition and building permits.

P9. Minor changes to individual homes, landscaping, or other minor plan elements would be subject to Planning Division review and approval of a Minor Adjustment to an approved project, or through Architectural Review, subject to the discretion of the Director of Community Development.

P10. Project site landscaping shall be maintained in good condition throughout the life of the Project and no trees shall be removed without City review and approval. Trees permitted by the City for removal shall be replaced at a 2:1 ratio with 24-inch box specimen tree, or equal alternative as approved by the Director of Community Development.

P11. Developer shall submit to the City Covenants, Conditions and Restrictions (CC&R’s) or equivalent instrument assigning and governing perpetual maintenance of the common lots, private street/vehicle access driveway, on-site and street frontage landscaping in good condition for the life of the Project, prior to issuance of building permits. Said document shall be recorded along with the Title for each property with the Santa Clara County Recorder’s Office.

P12. The Covenant, Conditions and Restrictions for this project shall include language that precludes exclusive storage use of the garage and obstruction of parking spaces in the garage by storage, shall and requires property owners to maintain garages for parking purposes.

P13. Garages shall be accessible for parking and labeled as such on the building permit plans.

P14. Overhead garage storage shall be offered as a design option in each of the units.

P15. Provide automatic garage door openers and roll-up garage doors.

P16. Each garage shall be equipped with electrical vehicle charging stations.

P17. HVAC units shall be screened from view along the public right-of-way.

P18. Individual garbage and recycling containers shall be kept out of sight from the public right-of-way and private driveway until collection day.

P19. Applicant shall comply with all the construction and on-going mitigation measures described in the adopted Mitigation Monitoring and Reporting Program to the satisfaction of the Director of Community Development. The Mitigation and Monitoring and Reporting Program shall be included in all construction plan sets.

P20. All exposed surfaces (e.g., parking areas, staging areas, soil piles, graded areas, and unpaved roads) shall be watered two times per day, except on days when rain occurs.

P21. All visible mud or dirt track-out onto the adjacent public right-of-way shall be removed using wet power vacuum street sweeper at least once per day. The use of dry power sweeping shall be prohibited.

P22. Additional dust and noise abatement measures may be on the project site at the discretion of the Community Development Director to provide additional sound attenuation and fugitive dust abatement as described in the project Mitigation Monitoring and Reporting Program. This may include additional noise monitoring and installation of a temporary noise control blanket barrier, if necessary, along building facades facing construction sites if conflicts occurred which are irresolvable by proper scheduling.

P23. This approval has been issued in reliance upon the developer’s assurance that no natural gas infrastructure will be installed at any time, and is an express basis for granting the PD rezoning. No natural gas infrastructure shall be installed on the project site. If the developer seeks to install natural gas infrastructure in the future, the developer must first seek an amendment to the PD zoning. 5 of 16
1957 Pruneridge Avenue – Rezone Conditions of Approval
PLN2022-00505
P24. Developer shall use reasonable efforts, to the satisfaction of the Director of Community Development, to obtain documentation from the Diocese of the previous church on the site, Saint Mark’s, regarding the disposition of the human remains and details as to their new location.

P25. Provide “Right Turn Only During Peak Hours” signage for the project driveway.

FIRE
F1. Prior to Building Permit Issuance, a Phase II environmental assessment is required to be submitted to CRRD for review. If hazards are present that require site mitigation, cleanup, or management of chemical contaminants in soil, soil vapor, or groundwater a separate permit from one of the regulatory agencies below will be required. The type and extent of contamination on site(s) will govern which of the regulatory agencies noted below can supervise the cleanup:
 Department of Toxic Substances Control (DTSC);
 State Water Resources Control Board; or
 Santa Clara County, Department of Environmental Health.

If the project intends to contract with a State or County Agency for onsite/offsite environmental remediation activities the following documentation shall be provided to the Fire Prevention & Hazardous Materials Division prior to issuance of a Building Permit for demolition or grading: Oversight agency case number; and Oversight mangers contact name, phone number.

F2. Prior to Building Permit Issuance, a permit for Construction Safety & Demolition shall be submitted to the fire department for review and approval in compliance with our Construction Safety & Demolition standard.

F3. Prior to Building Permit Issuance, provide documentation from the City of Santa Clara Water & Sewer Department that the minimum required fire-flow can be met. Fire Department fire-flow will be based on the current California Fire Code. The most restrictive departments requirement shall apply.

F4. Prior to Building Permit Issuance, building plans shall show the required number, location and distribution of fire hydrants for the buildings will be based on the current California Fire Code, Appendix C as amended. The required number of fire hydrants will be based on the fire-flow before the reduction for fire sprinklers. Both public and private fire hydrants may be required.

F5. Prior to Building Permit Issuance, any EVAE’s or fire protection equipment (including but not limited to fire service undergrounds, sprinkler piping, fire alarm equipment, fire pumps, ERRCS) that cross property lines or is not located on the parcel of the building it serves shall have a CC&R legally recorded detailing who is responsible for maintenance and repair of the EVAE or fire protection equipment
F6. Prior to any Building Permit issuance, an alternate means or methods permits to mitigate any code deficiency must be submitted and approved. Please submit this permit concurrently with the building plans. Please note specific mitigations may have been discussed during the PCC process. None of these discussions are binding and can only be formally approved through submitting an Alternate Means and Measures (AMM) permit. The AMM permit is formally documenting that and still needs to be submitted.

F7. Please be aware that emergency rescue openings are required for this project per California Residential Code R310 and locations should be on the front or back side of the house (not the side of the house).
6 of 16
1957 Pruneridge Avenue – Rezone Conditions of Approval
PLN2022-00505

PARKS & RECREATION
PR1. This memo assumes the Project is a subdivision and the Quimby Act provisions will apply. The project will generate an estimated 66 residents (2.98 persons/household x 22 units). Based on the Quimby Act standard of 3.0 acres/1000 residents, the amount of public parkland required for this Project to mitigate the impact of the new resident demand is approximately 0.1967-acres. The equivalent fee due in lieu of parkland dedication is therefore $1,378,608.

PR2. Final calculations will depend upon the actual number and type of units and the mix of parkland dedicated and remaining fee due, at the discretion of the City.

PR3. Calculations may change if the number of units change, if any areas do not conform to the Ordinance and City Code Chapter 17.35, and/or if the fee schedule for new residential development fees due in lieu of parkland dedication changes before a project is deemed complete by Planning.

PR4. Dwelling Unit Tax: a dwelling unit tax (DUT) in the amount of $700 is also due based on the number of units and additional bedrooms per City Code Chapter 3.15.

POLICE
PD1. The property should be fenced off during demolition and construction as a safety barrier to the public and deterrent to theft and other crime. Consider not having any screening material on the fence so passing Police Patrol checks will be able to see into the site.

PD2. Address numbers should be a minimum of twelve (12) inches in height for commercial or industrial buildings. Consider illuminated numbers during the hours of darkness, and in a color that is contrasting to the background material. They shall be clearly visible from the street. Where multiple units or buildings occupy the same property, each unit/building address shall be clearly visible. A monument sign, preferably at all entrances to the property, should be prominently displayed showing all unit/building numbers, addresses, etc. A map is recommended for large complexes with multiple streets or walkways.

PD3. If the project includes any benches, these benches should not be longer than 5 feet in length and should have arm rests at both ends. If the benches are longer than 5 feet in length, there should be a divider (arm rest or similar) in the middle of the bench in addition to the arm rests on both ends. This helps prevent unlawful lodging and/or skateboarding. Another option to benches could be cubes, knee walls, or other creative types of seating possibilities.

PUBLIC WORKS

ENGINEERING
E1. Obtain site clearance through Public Works Department prior to issuance of Building Permit. Site clearance will require payment of applicable development fees. Other requirements may be identified for compliance during the site clearance process.

Contact Public Works Department at (408) 615-3000 for further information.

E2. All work within the public right-of-way and/or public easement, which is to be performed by the Developer/Owner, the general contractor, and all subcontractors shall be submitted within a Single Encroachment Permit to be reviewed and issued by the City Public Works Department. Issuance of the Encroachment Permit and payment of all appropriate fees shall be completed prior to commencement of work, and all work under the permit shall be completed prior to issuance of occupancy permit.

E3. Submit public improvement/encroachment permit plans prepared in accordance with City Public Works Department procedures which provide for the installation of public improvements directly to the Public Works Department. Plans shall be prepared by a Registered Civil Engineer and approved by the City Engineer prior to approval and recordation of final map and/or issuance of building permits. 7 of 16
1957 Pruneridge Avenue – Rezone Conditions of Approval
PLN2022-00505
E4. All work within City of San Jose right-of-way shall require a City of San Jose encroachment permit.

E5. Existing non-standard or non-ADA compliant frontage improvements shall be replaced with current City standard frontage improvements as directed by the City Engineer or his designee.

E6. Damaged curb, gutter, and sidewalk within the public right-of-way along property’s frontage shall be repaired or replaced (to the nearest score mark) in a manner acceptable to the City Engineer or his designee. The extents of said repair or replacement within the property frontage shall be at the discretion of the City Engineer or his designee.

E7. Developer shall provide a complete storm drain study for the 10-year and 100-year storm events. The grading plans shall include the overland release for the 100-year storm event and any localized flooding areas. System improvements, if needed, will be at developer’s expense.

E8. All storm drain mains and laterals, sanitary sewer mains and laterals shall be outside the drip line of mature trees or 10’ clear of the tree trunk whichever is greater.

E9. Provide root barriers when the drip line of the mature trees covers the sidewalk. Root barriers for sidewalk protection shall be 16' long or extend to drip line of the mature tree, whichever is greater, and be 1.5' deep, and centered on trees. Root barriers for curb and gutter protection shall be 16' long or extend to drip line of the mature tree, whichever is greater, and be 2’ deep, and centered on trees.

E10. Existing streetlights shall be clear of proposed sidewalk, developer shall relocate as necessary.

E11. If requested, Developer/property owner shall prepare and submit for City approval a maintenance plan for all sidewalk, curb and gutter, landscaping and irrigation system improvements installed within the public right-of-way prior to encroachment permit issuance. Such plan shall include at a minimum, maintenance requirements for trees and shrubs, in acknowledgement of developer’s/property owner’s obligation under Chapter 12.30 and 17.15.

E12. Dedicate required on-site easements for any new public utilities, and/or emergency vehicle access by means of subdivision map or approved instrument at time of development.

E13. Dedicate sidewalk easements along the project frontage where public sidewalks extend into private property. Sidewalk easements are to be 1’ behind proposed back of walk where there is landscaping behind sidewalk. Sidewalk easement where hardscape is behind sidewalk is to be at back-of-walk. Cold joint is required between public sidewalk and private hardscape.

E14. Onsite pathways shall be dedicated as private easements, as needed.

E15. After City Council approval of the Tentative Map, submit the Subdivision Map, prepared by a Licensed Land Surveyor or a Registered Civil Engineer with Land Surveyor privileges to the Engineering Department. The submittal shall include a title report, closure calculations, and all appropriate fees.

E16. Pavement treatment shall be 2” grind and overlay with dig-outs for the full street width of Pruneridge Avenue.

E17. Traffic improvements must comply with the City of Santa Clara Standard Specifications for Public Works Construction
E18. Residential bicycle parking shall be a minimum of 8 Class I spaces (one per 3 dwelling units) and 2 Class II spaces (one per 15 dwelling units) per 2007 VTA Bicycle Technical Guidelines.
8 of 16
1957 Pruneridge Avenue – Rezone Conditions of Approval
PLN2022-00505
E19. Class I and Class II bicycle parking, as defined in SCMC 18.74.075, shall be conveniently accessible from the street, within 200 feet of a building entrance and/or highly visible areas.

E20. Submit Vehicle Miles Travel and vehicle trip calculations in accordance with the City transportation policy:
https://www.santaclaraca.gov/our-city/departments-g-z/public-works/engineering/trafficengineering/transportation-analysis-policy-update E21. Conduct a trip generation analysis for the project. A local transportation analysis (LTA) will be required if the project generates over 100 net new trips.

E22. Landscape improvements within 10 feet of a driveway must be less than 3 feet or greater than 10 feet per City Standard Detail TR-9.

E23. All on-site structures (including fences) must be clear of Driveway Visibility Clearance Areas per City Standard Detail TR-9.

E24. Replace unused/abandoned driveways with new curb, gutter, and sidewalk.

E25. Design and construct driveway in accordance with City Standard Detail ST-8.

STREETS DIVISION
Landscape
L1. Include City of Santa Clara Tree Preservation/City Arborist specifications on all improvement plans.

L2. No cutting of any part of public trees, including roots, shall be done without securing prior approval of the City Arborist. Tree trimming/removal shall be done in accordance to the City of Santa Clara Tree Preservation/City Arborist specifications and with direct supervision of a certified arborist (Certification of International Society of Arboriculture).

L3. Identified existing mature trees to be maintained. Prepare a tree protection plans for review and approval by the City of Santa Clara prior to any demolition, grading or other earthwork in the vicinity of existing trees on the site.

Solid Waste
SW1. The applicant shall complete and provide the Post-Construction Solid Waste Generation Estimation and Collection Form, which includes the estimation of trash and recycling materials generated from the project. Use the City’s Solid Waste Guidelines for New and Redevelopment Projects as specified by the development type. Contact the Public Works Department at [email protected] or (408) 615-3080 for more information. All collection is to occur on private property using individual toters.

SW2. The applicant shall provide a site plan showing all proposed locations of solid waste containers, chutes, compactors, trash enclosures and trash staging areas. The site plan shall show the route or access for trash and recycling collectors (trucks) including vertical clearance, turning radius and street/alley widths. All plans shall comply with the City’s Solid Waste Guidelines.

SW3. For projects that involve construction, demolition or renovation of 5,000 square feet or more, the applicant shall comply with City Code Section 8.25.285 and recycle or divert at least sixty five percent (65%) of materials generated for discard by the project during demolition and construction activities. No building, demolition, or site development permit shall be issued unless and until applicant has submitted a construction and demolition debris materials check-off list. Applicant shall create a Waste Management Plan and submit, for approval, a Construction and Demolition Debris Recycling Report through the City’s online tracking tool at http://santaclara.wastetracking.com/ .

SW4. Prior to obtaining a Temporary or Final Certificate of Occupancy, individual weight tickets for all materials generated for discard or reuse by the project during demolition and construction activities shall be uploaded to Green Halo and submitted for review and 9 of 16
1957 Pruneridge Avenue – Rezone Conditions of Approval
PLN2022-00505
approval by Environmental Services. At a minimum two (2) weeks review time is required.

SW5. This project is subject to the City’s Accumulation, Transportation and Disposal of Solid Waste Ordinance (Chapter 8.25 of the Municipal Codes), which requires the handling and disposal of waste by authorized service haulers. Insert the General Notes for the Construction & Demolition (C&D) Waste Management into construction plans in accordance with the City’s municipal codes prior to the issuance of a Building or Grading permit. Provide the Green Halo waste online tracking number to Building staff prior to the issuance of a demolition or building permit.

SW6. Project applicant shall contact the Public Works Department, Street Maintenance Division at (408) 615-3080 to verify if the property falls within the City’s exclusive franchise hauling area. If so, the applicant is required to use the City’s exclusive franchise hauler and rate structure for any hired debris boxes. Prior to the issuance of a Public Works clearance, the project applicant shall complete and sign the Construction and Demolition (C&D) / Waste Management Rules and Regulations Form.

SW7. All refuse from all residential, commercial, industrial and institutional properties within the city shall be collected at least once a week, unless otherwise approved in writing (SCCC

8.25.120). Garbage service level required for residential developments (single-family and multi-family) as well as motels and hotels shall be no less than twenty (20) gallons per unit. All project shall submit to the Public Works Department the preliminary refuse service level assessment for approval.

Stormwater
ST1. Prior to City’s issuance of Building or Grading Permits, the applicant shall develop a Final Stormwater Management Plan, update the C.3 Data Form, the Special Project Narratives and Worksheet (as appropriate), and an Erosion and Sediment Control Plan.

ST2. The Final Stormwater Management Plan and all associated calculations shall be reviewed and certified by a qualified 3rd party consultant from the SCVURPPP List of Qualified Consultants, and a 3rd party review letter shall be submitted with the Plan.

ST3. For project that disturbs a land area of one acre or more, the applicant shall provide a copy of the Notice of Intent (NOI) with WDID number for coverage under the State Construction General Permit. Active projects with NOI will be inspected by the City once per month during the wet season (October – April).

ST4. The applicant shall incorporate Best Management Practices (BMPs) into construction plans and incorporate post-construction water runoff measures into project plans. Include the SCVURPPP Countywide Construction BMPs Plan Sheet with the plans.

ST5. Include the C.3 Treatment Facilities Construction Notes on the Improvement Plans and/or Stormwater Control Plans.

ST6. During the construction phase, all stormwater control measures shall be inspected for conformance to approved plans by a qualified 3rd party consultant from the SCVURPPP List of Qualified Consultants, and a 3rd party concurrence letter on the C.3 facilities construction shall be submitted to the Public Works Department. The City reserves the right to review the 3rd party inspection reports on the C.3 stormwater facilities installation.

ST7. Applicant shall install biotreatment soil media that meets the minimum specifications as set forth in the SCVURPPP C.3 Stormwater Handbook. If percolation rate test of the biotreatment soil mix is not performed on-site, a certification letter from the supplier verifying that the soil meets the specified mix (the date of such document shall not be older than 3 months).

ST8. As-Built drawing shall be submitted to the Public Works Department. Include C.3 Stormwater Treatment Facilities Construction general notes on the improvement plans. 10 of 16
1957 Pruneridge Avenue – Rezone Conditions of Approval
PLN2022-00505
ST9. Permeable Pavement, Media Filter vaults, Interceptor Trees and Trash Full Capture Devices shall be inspected by a third-party reviewer and/or manufacturer representative for conformance with the details and specifications. If necessary, percolation test shall be performed to ensure proper installation. A map displaying the number, location and details of full trash capture devices shall be prepared as an attachment to the Operations and Maintenance (O&M) Agreement with the City.

ST10. Stormwater treatment facilities must be designed, installed, and maintained to achieve the site design measures throughout their life in accordance to the SCVRUPPP C.3 Stormwater Handbook (Chapter 6 and Appendix C).

ST11. The property owner shall enter into an Operation and Maintenance (O&M) Agreement with the City for all installed stormwater treatment measures and full trash capture devices in perpetuity. Applicants should contact Public Works Department. - Environmental Services at (408) 615-3080 or [email protected] for assistance completing the Agreement. For more information and to download the most recent version of the O&M Agreement, visit the City’s stormwater resources website at http://santaclaraca.gov/stormwater. Inspection of permeable pavement, media filter vaults and full trash capture devices is to be done annually by December 31 of each year.

ST12. Any site design measures used to reduce the size of stormwater treatment measures shall not be installed for the project without the written approval from the City, installing the corresponding resizing of other stormwater treatment measures and an amendment of the property’s O&M Agreement.

ST13. For single-family homes and other small projects that create and/or replace 2,500 – 10,000 square feet of impervious surface area, the applicant shall implement at least one of the following site design measures:
a. Direction of roof runoff into cisterns or rain barrels b. Direction of roof, sidewalk, walkway, patio, driveway, or parking lot runoff onto vegetated areas
c. Construction of sidewalks, walkways, patios, bike lanes, driveways, and parking lots with permeable surfaces
Plans shall specify which site design measures are selected for the project and show the direction of flow from impervious surfaces to the selected site design measures. All measures shall meet the design criteria in the 2016 C.3. Stormwater Handbook, Appendix K: Standard Specifications for Lot-Scale Measures for Small Projects.

ST14. Developer shall install an appropriate stormwater pollution prevention message such as “No Dumping – Flows to Bay” on any storm drains located on private property.

ST15. Interior floor drains shall be plumbed to the sanitary sewer system and not connected to the City’s storm drain system.

ST16. Floor drains within trash enclosures shall be plumbed to the sanitary sewer system and not connected to the City’s storm drain system.

ST17. All outdoor equipment and materials storage areas shall be covered and/or bermed, or otherwise designed to limit the potential for runoff to contact pollutants.

ST18. Decorative and recreational water features such as fountains, pools, and ponds shall be designed and constructed to drain to the sanitary sewer system only.

ST19. The use of architectural copper is discouraged. If such material is used, all wastewater generated by the installation, cleaning, treating, or washing of the surface of copper architectural features, including copper roofs, shall not be discharged to the City’s storm drain system.

SILICON VALLEY POWER
11 of 16
1957 Pruneridge Avenue – Rezone Conditions of Approval
PLN2022-00505
EL1. Drive Aisle A should be a 10’ U.G.E.E if its only for electric and public tv and cable companies. Install a joint trench with public tv and cable conduits 1’ away from the SVP conduits. This clearance only applies if all conduits are installed at the same time.

Reference UG1000 standard for joint trench configuration. Phone and cable conduits should be placed on the side closer to the trees.

EL2. Any streetlight foundations that conflict with the new location of the SVP trench along Pruneridge Ave, will need to be relocated further back from the front of curb.

EL3. All streetlighting, low voltage, and fiber systems are to be designed during detailed design.

EL4. All tie-in points shown on the utility plan along with electrical substructure will be needed prior to the removal of the overhead power lines.

EL5. All electrical laterals serving parcels on the south side of Drive Aisle A may need easements if it’s a private roadway. All easements for SVP should be a U.G.E.E (underground electric easement).

EL6. Clearances: (Make sure job notes do not conflict with SVP clearance requirements) a. EQUIPMENT
i.Ten (10) foot minimum clearance is required in front of equipment access doors. (UG1000 sheet 11)
ii.Five (5) foot minimum clearance from pad is required on sides without equipment access doors. (UG1000 sheet 11)
iii.Eighteen (18) foot minimum width, shall be provided and maintained on one side of the equipment pad to allow an electric dept. line truck to drive up next to the pad for installation and maintenance of equipment. (UG1000 Sheet 11).
iv.Barrier pipes are required only on sides accessible to vehicles. (UG1000 Sheet 12).

1. Thirty (30) inches from side of equipment sides.

2. Forty Eight (48) inches in front of access doors.
a. Barrier Pipes in front of access doors shall be removable. b. CONDUITS
i.Five (5) foot minimum longitudinal clearance between new conduits or piping systems (open trench installation) and any existing or proposed SVP conduit system. This is for longitudinal. (UG1250 sheet 5) ii.Twelve (12) inch minimum vertical clearance between new conduit/pipes installed perpendicular to existing SVP conduits for open trench installations. (UG1000 sheet 36, UG1250 Sheet 6)
iii.Three (3) foot six (6) inches clearance is required from poles for open trench installation. Exceptions are for riser conduit. (UG1250 Sheet 7) iv.Three (3) foot minimum clearance is required between sign-posts, barrier pipes or bollards, fence posts, and other similar structures. (UG1250 sheet 10).
v.Five (5) foot minimum from new splice boxes, pull boxes, manholes, vaults, or similar subsurface facilities. (UG1000 sheet 8)
vi.Five (5) foot minimum clearance from walls, footings, retaining wall, landscape planter, tree root barrier or other subsurface wall or structure. (UG1250 sheet 9).
vii.Five (5) foot minimum clearance is required between fire hydrant thrust block. The thrust block extends 5’ foot on either side of the fire hydrant in line with the radial water pipe connected to the hydrant. c. VAULTS/MANHOLES
12 of 16
1957 Pruneridge Avenue – Rezone Conditions of Approval
PLN2022-00505
i.Ten (10) foot minimum clearance is required between adjacent Vaults or Manholes.
ii.Five (5) foot minimum clearance is required between adjacent conduits. iii.Minimum 36” from face of curb, or bollards required. d. Poles (Electrolier, Guy Stub poles, service clearance poles, self-supporting steel poles and lighting poles.)
i.Three (3) foot six (6) inches clearance is required from poles for open trench installation. Exceptions are for riser conduit. (UG1250 Sheet 7) e. Guy Anchors
i.Five (5) foot minimum clearance is required between center of anchor line and any excavation area. (UG1250 sheet 15).
f. Trees
i.OH 1230 for Overhead Lines
ii.SD 1235 for Tree Planting Requirements near UG Electric Facilities EL7. Reference listed SVP standards for clearances.
a. Installation of Underground Substructures by Developers b. UG1250 – Encroachment Permit Clearances from Electric Facilities c. UG0339 – Remote Switch Pad
d. OH1230 – Tree Clearances From Overhead Electric Lines e. SD1235 – Tree Planting Requirements Near Underground Electric Facilities EL8. Prior to submitting any project for Electric Department review, applicant shall provide a site plan showing all existing utilities, structures, easements and trees. Applicant shall also include a “Load Survey” form showing all current and proposed electric loads. A new customer with a load of 500KVA or greater or 100 residential units will have to fill out a “Service Investigation Form” and submit this form to the Electric Planning Department for review by the Electric Planning Engineer. SVP will do exact design of required substructures after plans are submitted for building permits.

EL9. The Developer shall provide and install electric facilities per Santa Clara City Code chapter 17.15.210.

EL10. Electric service shall be underground. See Electric Department Rules and Regulations for available services.

EL11. Installation of underground facilities shall be in accordance with City of Santa Clara Electric Department standard UG-1000, latest version, and Santa Clara City Code chapter 17.15.050.

EL12. Underground service entrance conduits and conductors shall be “privately” owned, maintained, and installed per City Building Inspection Division Codes. Electric meters and main disconnects shall be installed per SVP Standard MS-G7, Rev. 2.

EL13. The developer shall grant to the City, without cost, all easements and/or right of way necessary for serving the property of the developer and for the installation of utilities (Santa Clara City Code chapter 17.15.110).

EL14. If the “legal description” (not “marketing description”) of the units is condominium or apartment, then all electric meters and services disconnects shall be grouped at one location, outside of the building or in a utility room accessible directly from the outside. If they are townhomes or single-family residences, then each unit shall have its own meter, located on the structure. A double hasp locking arrangement shall be provided on the main switchboard door(s). Utility room door(s) shall have a double hasp locking arrangement or a lock box shall be provided. Utility room door(s) shall not be alarmed.

EL15. If transformer pads are required, City Electric Department requires an area of 17’ x 16’- 2”, which is clear of all utilities, trees, walls, etc. This area includes a 5’-0” area away from the actual transformer pad. This area in front of the transformer may be reduced from an 8’-0” apron to a 3’-0”, providing the apron is back of a 5’-0” min. wide 13 of 16
1957 Pruneridge Avenue – Rezone Conditions of Approval
PLN2022-00505
sidewalk. Transformer pad must be a minimum of 10’-0 from all doors and windows, and shall be located next to a level, drivable area that will support a large crane or truck.

EL16. All trees, existing and proposed, shall be a minimum of five (5) feet from any existing or proposed Electric Department facilities. Existing trees in conflict will have to be removed. Trees shall not be planted in PUE’s or electric easements.

EL17. Any relocation of existing electric facilities shall be at Developer’s expense.

EL18. Electric Load Increase fees may be applicable.

EL19. The developer shall provide the City, in accordance with current City standards and specifications, all trenching, backfill, resurfacing, landscaping, conduit, junction boxes, vaults, street light foundations, equipment pads and subsurface housings required for power distribution, street lighting, and signal communication systems, as required by the City in the development of frontage and on-site property. Upon completion of improvements satisfactory to the City, the City shall accept the work. Developer shall further install at his cost the service facilities, consisting of service wires, cables, conductors, and associated equipment necessary to connect a customer to the electrical supply system of and by the City. After completion of the facilities installed by developer, the City shall furnish and install all cable, switches, street lighting poles, luminaries, transformers, meters, and other equipment that it deems necessary for the betterment of the system (Santa Clara City Code chapter 17.15.210 (2)).

EL20. Electrical improvements (including underground electrical conduits along frontage of properties) may be required if any single non-residential private improvement valued at $200,000 or more or any series of non-residential private improvements made within a three-year period valued at $200,000 or more (Santa Clara City Code Title 17 Appendix A (Table III)).

EL21. Non-Utility Generator equipment shall not operate in parallel with the electric utility, unless approved and reviewed by the Electric Engineering Division. All switching operations shall be “Open-Transition-Mode”, unless specifically authorized by SVP Electric Engineering Division. A Generating Facility Interconnection Application must be submitted with building permit plans. Review process may take several months depending on size and type of generator. No interconnection of a generation facility with SVP is allowed without written authorization from SVP Electric Engineering Division.

EL22. Encroachment permits will not be signed off by SVP until Developers Work substructure construction drawing has been completed.

EL23. All SVP-owned equipment is to be covered by an Underground Electric Easement (U.G.E.E.) This is different than a PUE. Only publicly-owned dry utilities can be in a UGEE. Other facilities can be in a joint trench configuration with SVP, separated by a 1’ clearance, providing that they are constructed simultaneously with SVP facilities. See UG 1000 for details.

EL24. Proper clearance must be maintained from all SVP facilities, including a 5’ clearance from the outer wall of all conduits. This is in addition to any UGEE specified for the facilities. Contact SVP before making assumptions on any clearances for electric facilities.

EL25. Transformers and Switch devices can only be located outdoors. These devices MAY be placed 5’ from an outside building wall, provided that the building wall in that area meets specific requirements. (See UG 1000 document for specifics) EXAMPLE: If there are any doors, windows, vents, overhangs or other wall openings within 5’ of the transformer, on either side, then the transformer MUST be 10’ or more away from the building. These clearances are to be assumed to be clear horizontally 5’ in either direction and vertically to the sky.

EL26. All existing SVP facilities, onsite or offsite, are to remain unless specifically addressed by SVP personnel by separate document. It is the Developers responsibility to maintain all 14 of 16
1957 Pruneridge Avenue – Rezone Conditions of Approval
PLN2022-00505
clearances from equipment and easements. Developer to contact SVP outside of the PCC process for clear definitions of these clearance requirements. Developer should not assume that SVP will be removing any existing facilities without detailed design drawings from SVP indicating potential removals. Simply indicating that SVP facilities are to be removed or relocated on conceptual plans does not imply that this action has been approved by SVP.

EL27. SVP does not utilize any sub-surface (below grade) devices in its system. This includes transformers, switches, etc.

EL28. All interior meter rooms at ground level are to have direct, outside access through only ONE door. Interior electric rooms must be enclosed in a dedicated electric room and cannot be in an open warehouse or office space.

EL29. High Rise Metering and Multi-Floor Infrastructure Requirements a. Refer to UG0250 – High Density Residential Metering Requirements b. Refer to FO-1901 – Fiber Optic Splicing and Testing Methods EL30. In the case of podium-style construction, all SVP facilities and conduit systems must be located on solid ground (aka “real dirt”) and cannot be supported on parking garage ceilings or placed on top of structures.

EL31. Applicant is advised to contact SVP (CSC Electric Department) to obtain specific design and utility requirements that are required for building permit review/approval submittal. Please provide a site plan to Leonard Buttitta at 408-615-6620 to facilitate plan review.

EL32. In events where electric load demand exceeds 2MVA or service size exceeds 4000 Amps at 480V for a building, the Customer shall take service at 12KV. If electric load for a single metered location service exceeds 4.5MVA, additional 12KV service(s) may be provided. All 12KV utility connection points terminate at the Customer Switchgear.

UGEE easement up to the Customer Switchgear is required, along with an 18’ drivable space. 10’ working clearance is required in front of and behind the switchgear. 5’ working clearance is required on the sides of the switchgear (with no panels). Customer 12KV Switchgear must be located outdoors on “real dirt” unless otherwise agreed upon with SVP. SVP owns and maintains the cable/conduit up to the customer switchgear.

EL33. In events where electric service is provided at 120/208V or 277/480V the utility connection point is at the secondary compartment of SVP transformers. Customer owns and maintains the cable and conduits up to the SVP transformers.

EL34. No cross-parcel distribution is allowed. SVP service points must be within the parcels that they serve.

WATER & SEWER
W1. Recycled Water Ready: All onsite plumbing for non-domestic water uses (e.g. irrigation, industrial processes, cooling, etc.) shall be designed for recycled water use and shall comply with all Recycled Water regulations.

W2. Encroachment Permit: Prior to issuance of Building Permits, the applicant shall submit an encroachment permit application and design plans for construction of water utilities that comply with the latest edition of the Water & Sewer Utilities Water Service and Use Rules and Regulations, Water System Notes, and Water Standard Details and Specifications. In addition, prior to the City's issuance of Occupancy, the applicant shall construct all public water utilities per the approved plans. The Water & Sewer Utilities will inspect all public water utility installations and all other improvements encroaching public water utilities.

W3. Utility Design Plans: Utility Design Plans shall indicate the pipe material and the size of existing water, recycled water and sewer main(s). The plans shall show the nearest existing fire hydrant and the two nearest existing water main line gate valves near the 15 of 16
1957 Pruneridge Avenue – Rezone Conditions of Approval
PLN2022-00505
project area. The plans shall show meter and backflow configurations to scale and per City of Santa Clara Water & Sewer Utilities Standard Details. Note that all new water meters and backflow prevention devices shall be located behind the sidewalk in a landscape area. Fire hydrants should be located two feet behind monolithic sidewalk if sidewalk is present; two feet behind face of curb if no sidewalk is present, per City Std Detail 18. The plans shall provide the profile section details for utilities crossing water, sewer, or recycled water mains to ensure a 12” minimum vertical clearance is maintained.

W4. Utility Separations: Applicant shall adhere to and provide a note indicating that all horizontal and vertical clearances comply with State and local regulations. The applicant shall maintain a minimum 12” of vertical clearance at water service crossing with other utilities, and all required minimum horizontal clearances from water services:
10' from sanitary sewer utilities, 10’ from recycled water utilities, 8' from storm drain utilities, 5' from fire and other water utilities, 3' from abandoned water services, 5' from gas and electric utilities, and 5’ from the edge of the propose or existing driveway. For sanitary sewer, water, and recycled water utilities, the applicant shall maintain a minimum horizontal clearance of 10' from existing and proposed trees. If applicant installs tree root barriers, clearance from tree reduces to 5' (clearance must be from the edge of tree root barrier to edge of water facilities). No structures (fencing, foundation, biofiltration swales, etc.) allowed over sanitary sewer, potable water and/or recycled water utilities and easements.

W5. Separate Services: Applicant shall submit plans showing proposed water, recycled water, sanitary sewer, and fire services connected to a public main in the public right-ofway to the satisfaction of the Director of Water & Sewer Utilities. Different types of water and recycled water use (domestic, irrigation, fire) shall be served by separate water services, each separately tapped at the water main. Tapping on existing fire service line(s) is prohibited. Approved backflow prevention device(s) are required on all potable water services.

W6. City Standard Meters and Backflows: All proposed meters and backflows for all water services shall meet the current City of Santa Clara Water & Sewer Utilities Standard Details. Plans shall show meter and backflow configurations to scale.

W7. Existing Services: The applicant must indicate the disposition of all existing water and sewer services and mains on the plans. If the existing services will not be used, then the applicant shall properly abandon these services to the main per Water & Sewer Utilities standards and install a new service to accommodate the water needs of the project. The applicant shall bear the cost of any relocation or abandonment of existing Water Department facilities required for project construction to the satisfaction of the Director of Water and Sewer Utilities.

W8. On-Site Storm Drain Treatment: Prior to issuance of Building Permit, the applicant shall submit plans showing any onsite storm water treatment system. The plan shall include a section detail of the treatment system. No water, sewer, or recycled water facilities shall be located within 5-feet of any storm water treatment system.

W9. Water Usage: Prior to the issuance of Building Permits, the applicant shall provide documentation of water usage so the Water Division can verify the appropriate size of all proposed water meters. Please note that if the existing water services are incapable of supplying the water needs to the site, the existing services shall be abandoned, and new separate dedicated water services shall be provided for each use (domestic and irrigation).

W10. Landscaping: All the landscaping for the project shall comply with the California Water Conservation in Landscaping Act, Government Code Section 65591 et. seq. All plants 16 of 16
1957 Pruneridge Avenue – Rezone Conditions of Approval
PLN2022-00505
shall be either California native or non-invasive, low water-using or moderate waterusing plants. High water-using plants and nonfunctional turf are prohibited.

W11. Prior to issuance of Building Permits, the applicant shall submit plan details for all water features (including but not limited to fountains and ponds) designed to include provisions for operating the system without City potable water supply and capable of being physically disconnected from source of potable water supply during City declared water conservation periods, to the satisfaction of the Director of the Water & Sewer Utilities. Decorative water features may be permanently connected to the City’s recycled water supply.

W12. Easements: Prior to City’s issuance of Building or Grading Permits, the applicant shall provide a dedicated water utility easement around the backflow prevention device onsite. The water utility easement for the water services and all other public water appurtenances shall be a minimum 15 feet wide and be adjacent to the public right-ofway without overlapping any public utility easement. Additionally, the applicant shall submit plans defining existing easements so Water Division can verify if there are any conflicts with proposed easements and water utilities.

W13. Underground Fire Permit: Prior to issuance of Building Permits, applicant shall submit an underground fire permit unless otherwise waived by the Fire Department. If fire flow information is needed, applicant shall coordinate with Water and Sewer Utilities Department, for fire flow information at (408)615-2000. A dedicated fire service line, with an approved backflow prevention device, shall be used for on-site fire hydrants.

Fire service lines required for commercial and industrial use shall be sized appropriately per fire flow demand and code requirements.

W14. Record Drawings: Upon completion of construction and prior to the City’s issuance of a Certificate of Occupancy, the applicant shall provide "as-built" drawings of the public water utility infrastructure prepared by a registered civil engineer to the satisfaction of the Director of Water & Sewer Utilities Department.

W15. Water Shortage Response Actions: Pursuant to the City of Santa Clara’s Urban Water Management Plan, during times of drought or water shortage, the City implements water shortage response actions in accordance with the level of water shortage declared. All construction activities and all new irrigation connections are subject to the Water Shortage Response Actions in effect at the time of construction and connection of the irrigation service.

Water Shortage Response Actions for Stage 2 and higher include water use restrictions that limit the use of potable water such as:
a. prohibiting the installation of new potable water irrigation services. new irrigation connections, construction, and dust control.
b. restrict the use of potable water used for construction and dust control if recycled water is available.

This project is subject to all the requirements and restrictions of the Water Shortage Response Actions in place or adopted during the duration of the project. For more information, visit the City of Santa Clara Water & Sewer Utilities website at www.santaclaraca.gov/waterconservation .
1 of 4
1957 Pruneridge Avenue – VTSM Conditions of Approval
PLN23-002641

VESTING TENTATIVE SUBDIVISION MAP CONDITIONS OF APPROVAL

GENERAL
G1. If relocation of an existing public facility becomes necessary due to a conflict with the developer's new improvements, then the cost of said relocation shall be borne by the developer.

G2. Comply with all applicable codes, regulations, ordinances and resolutions.

ATTORNEY’S OFFICE
A1. The Developer agrees to defend and indemnify and hold City, its officers, agents, employees, officials and representatives free and harmless from and against any and all claims, losses, damages, attorneys' fees, injuries, costs, and liabilities arising from any suit for damages or for equitable or injunctive relief which is filed by a third party against the City by reason of its approval of developer's project.

COMMUNITY DEVELOPMENT

BUILDING DIVISION
B1. Informational: Prior to overall construction permit application, submit to the Santa Clara Building Division, 2 copies of an addressing diagram request, to be prepared by a licensed architect or engineer. The addressing diagram(s) shall include all proposed streets and all building floor plans. The addressing diagram(s) shall conform to Santa Clara City Manager Directive #5; Street Name and Building Number Changes, and Santa Clara Building Division Address Policy For Residential and Commercial Developments. The addressing diagram(s) shall indicate all unit numbers to be based off established streets, not alleys nor access-ways to garages. Allow a minimum of 10 working days for initial staff review. Please note city staff policy that existing site addresses typically are retired. Provide digital pdf printed from design software, not scanned from printed paper sheet.

B2. Informational: The construction permit application drawings submitted to the Santa Clara Building Division shall include a copy of the latest Federal Emergency Management Agency (FEMA) Flood Zone Map: https://msc.fema.gov/portal/home. The project drawings shall indicate how the project complies with the Santa Clara Flood Damage Prevention Code.

B3. Informational: The construction permit application drawings submitted to the Santa Clara Building Division shall include Santa Clara Valley Urban Runoff Pollution Prevention Program Low Impact Development (LID) practices http://www.scvurpppw2k.com/nd_wp.shtml. All projects that disturb more than one acre, or projects that are part of a larger development that in total disturbs more than one acre, shall comply with the Santa Clara Valley Urban Runoff Pollution Prevention Program Best Management Practices (BMP): http://www.scvurppp-w2k.com/construction_bmp.shtml, and shall provide a Storm Water Pollution Prevention Plan (SWPPP) by a certified Qualified SWPPP Developer (QSD). All site drainage and grading permit applications submitted to the Santa Clara Building Division shall include a city of Santa Clara "C3" data form, available on this web page:
https://www.santaclaraca.gov/our-city/departments-g-z/public-works/environmentalprograms/stormwater-pollution-prevention and will be routed to a contract consultant for review.

B4. Informational: no California construction code review is being done at this time. The construction permit application drawings submitted to the Santa Clara Building Division 2 of 4
1957 Pruneridge Avenue – VTSM Conditions of Approval
PLN23-002641
shall include an overall California Building Code analysis, including; proposed use and occupancy of all spaces (19' CBC Ch. 3), all building heights and areas (19' CBC Ch. 5), all proposed types of construction (19' CBC Ch. 6), all proposed fire and smoke protection features, including all types of all fire rated penetrations proposed (19' CBC Ch. 7), all proposed interior finishes fire resistance (19' CBC Ch. 8), all fire protection systems proposed (19' CBC Ch. 9), and all means of egress proposed (19' CBC Ch. 10).

Noncombustible exterior wall, floor, and roof finishes are strongly encouraged.  During construction retaining a single company to install all fire rated penetrations is highly recommended.
 The grade level lobbies shall be min.1 hour rated all sides and above.  All stair shafts shall be minimum 1 hour rated.
 All elevator shafts shall be minimum 1 hour rated.
 All trash chute shafts shall be minimum 1 hour rated.  Recommendation: provide a minimum of two trash chutes; one for recyclables, one for trash, each trash chute to be routed down to a grade level trash collection room.
 Any trash rooms shall be minimum 1 hour rated all sides and above.

B5. Informational: The overall project construction permit application shall include the geotechnical, architectural, structural, energy, electrical, mechanical, and plumbing drawings and calculations. Prior to the issuance of the overall project construction permit, a conditions of approval review meeting must be held in city hall, which meeting must be attended by the on-site field superintendent(s). The meeting will not be held without the attendance of the on-site field superintendent(s). The on-site grading permit shall be a separate permit application to the Building Division.

B6. Informational: Temporary Certificates of Occupancy (TCO) will not be routinely issued and will be considered on a very limited basis only when there is a clear and compelling reason for city staff to consider a TCO. A TCO will be approved only after all applicable City staff have approved in writing; Planning, Public Works./ Engineering, Fire Prevention, Santa Clara Water, Silicon Valley Power, and any other applicable agencies such as the Santa Clara County Health Department, with the Building Division being the final approval of all TCO.'s.

PLANNING DIVISION
P1. Developer shall submit to the City Covenants, Conditions and Restrictions (CC&R’s) or equivalent instrument assigning and governing perpetual maintenance of the common lot/private street in good condition for the life of the Project, prior to issuance of building permits. Said document shall be recorded along with the Title for each property with the Santa Clara County Recorder’s Office.

P2. The Covenant, Conditions and Restrictions for this project shall include language that precludes exclusive storage use of the garage and obstruction of parking spaces in the garage by storage, shall and requires property owners to maintain garages for parking purposes.

FIRE
F1. Prior to Building Permit Issuance, any EVAE’s or fire protection equipment (including but not limited to fire service undergrounds, sprinkler piping, fire alarm equipment, fire pumps, ERRCS) that cross property lines or is not located on the parcel of the building it serves shall have a CC&R legally recorded detailing who is responsible for maintenance and repair of the EVAE or fire protection equipment.
3 of 4
1957 Pruneridge Avenue – VTSM Conditions of Approval
PLN23-002641

PUBLIC WORKS

ENGINEERING
E1. Obtain site clearance through Public Works Department prior to issuance of Building Permit. Site clearance will require payment of applicable development fees. Other requirements may be identified for compliance during the site clearance process.

Contact Public Works Department at (408) 615-3000 for further information.

E2. All work within the public right-of-way and/or public easement, which is to be performed by the Developer/Owner, the general contractor, and all subcontractors shall be submitted within a Single Encroachment Permit to be reviewed and issued by the City Public Works Department. Issuance of the Encroachment Permit and payment of all appropriate fees shall be completed prior to commencement of work, and all work under the permit shall be completed prior to issuance of occupancy permit.

E3. Submit public improvement/encroachment permit plans prepared in accordance with City Public Works Department procedures which provide for the installation of public improvements directly to the Public Works Department. Plans shall be prepared by a Registered Civil Engineer and approved by the City Engineer prior to approval and recordation of final map and/or issuance of building permits.

E4. All work within City of San Jose right-of-way shall require a City of San Jose encroachment permit.

E5. Existing non-standard or non-ADA compliant frontage improvements shall be replaced with current City standard frontage improvements as directed by the City Engineer or his designee.

E6. Damaged curb, gutter, and sidewalk within the public right-of-way along property’s frontage shall be repaired or replaced (to the nearest score mark) in a manner acceptable to the City Engineer or his designee. The extents of said repair or replacement within the property frontage shall be at the discretion of the City Engineer or his designee.

E7. Dedicate required on-site easements for any new public utilities, and/or emergency vehicle access by means of subdivision map or approved instrument at time of development.

E8. Dedicate sidewalk easements along the project frontage where public sidewalks extend into private property. Sidewalk easements are to be 1’ behind proposed back of walk where there is landscaping behind sidewalk. Sidewalk easement where hardscape is behind sidewalk is to be at back-of-walk. Cold joint is required between public sidewalk and private hardscape.

E9. Onsite pathways shall be dedicated as private easements, as needed.

E10. After City Council approval of the Tentative Map, submit the Subdivision Map, prepared by a Licensed Land Surveyor or a Registered Civil Engineer with Land Surveyor privileges to the Engineering Department. The submittal shall include a title report, closure calculations, and all appropriate fees.

SILICON VALLEY POWER
EL1. Remove overlapping PUE and UGEE on the north side of Drive Aisle A. It should only be a UGEE and you should install a joint trench to allow for SVP conduits and public tv/cable. In the joint trench configuration conduits need to go in at the same time, 1’ apart. Reference UG1000 standard.
4 of 4
1957 Pruneridge Avenue – VTSM Conditions of Approval
PLN23-002641

WATER & SEWER
W1. Related Approvals: Applicant shall comply with all related City approvals, entitlements, permits, or requirements associated with the subject property, unless explicitly superseded or revised by the Director of Water and Sewer Utilities.

W2. Separate Services: Applicant shall provide separate water, recycled water, sanitary sewer, and fire services connected to a public main in the public right-of-way services for each parcel to the satisfaction of the Director of Water & Sewer Utilities. Different types of water and recycled water use (domestic, irrigation, fire) shall be served by separate water services, each separately tapped at the water main. Services cannot cross a different parcel than the one it serves. No parcel shall be created that requires an easement from an adjacent parcel in order to be served. Tapping on existing fire service line(s) is prohibited. Approved backflow prevention device(s) are required on all potable water services.

W3. Easements: Prior to City’s issuance of Building or Grading Permits, the applicant shall provide a dedicated water utility easement around the backflow prevention device onsite.

The water utility easement for the water services and all other public water appurtenances shall be a minimum 15 feet wide and be adjacent to the public right-ofway without overlapping any public utility easement. Additionally, the applicant shall submit plans defining existing easements so Water Division can verify if there are any conflicts with proposed easements and water utilities.
1 of 16
1957 Pruneridge Avenue – Conditions of Approval
PLN25-00073

CONDITIONS OF APPROVAL
1957 Pruneridge Avenue -PLN25-00073 APNs: 230-05-021
Project Description: Amend the Approved Planned Development (PD) Zoning for 22 AllElectric Detached Single-Family Residences (PLN22-00505) to Allow for the Installation of Natural Gas Stove Appliances for the Property Located at 1957 Pruneridge Avenue.

GENERAL
G1. If relocation of an existing public facility becomes necessary due to a conflict with the developer's new improvements, then the cost of said relocation shall be borne by the developer.

G2. Comply with all applicable codes, regulations, ordinances and resolutions.

ATTORNEY’S OFFICE
A1. The Developer agrees to defend and indemnify and hold City, its officers, agents, employees, officials and representatives free and harmless from and against any and all claims, losses, damages, attorneys' fees, injuries, costs, and liabilities arising from any suit for damages or for equitable or injunctive relief which is filed by a third party against the City by reason of its approval of developer's project.

COMMUNITY DEVELOPMENT

BUILDING DIVISION
B1. Prior to overall construction permit application, submit to the Santa Clara Building Division, 2 copies of an addressing diagram request, to be prepared by a licensed architect or engineer. The addressing diagram(s) shall include all proposed streets and all building floor plans. The addressing diagram(s) shall conform to Santa Clara City Manager Directive #5; Street Name and Building Number Changes, and Santa Clara Building Division Address Policy For Residential and Commercial Developments. The addressing diagram(s) shall indicate all unit numbers to be based off established streets, not alleys nor access-ways to garages. Allow a minimum of 10 working days for initial staff review. Please note city staff policy that existing site addresses typically are retired.

Provide digital pdf printed from design software, not scanned from printed paper sheet. a. Any building or structure that is demolished shall have its address retired and a new address/s shall be issued for the project.

B2. The construction permit application drawings submitted to the Santa Clara Building Division shall include a copy of the latest Federal Emergency Management Agency (FEMA) Flood Zone Map: https://msc.fema.gov/portal/home. The project drawings shall indicate how the project complies with the Santa Clara Flood Damage Prevention Code. a. FEMA Flood Zone map designations and requirements are based on the map in effect at date of Building Permit issuance.

B3. The construction permit application drawings submitted to the Santa Clara Building Division shall include Santa Clara Valley Urban Runoff Pollution Prevention Program Low Impact Development (LID) practices http://www.scvurppp-w2k.com/nd_wp.shtml .

All projects that disturb more than one acre, or projects that are part of a larger development that in total disturbs more than one acre, shall comply with the Santa Clara City of
Santa Clara
The Center of What's Possible
2 of 16
1957 Pruneridge Avenue – Conditions of Approval
PLN25-00073
Valley Urban Runoff Pollution Prevention Program Best Management Practices (BMP):
http://www.scvurppp-w2k.com/construction_bmp.shtml, and shall provide a Storm Water Pollution Prevention Plan (SWPPP) by a certified Qualified SWPPP Developer (QSD).

All site drainage and grading permit applications submitted to the Santa Clara Building Division shall include a city of Santa Clara "C3" data form, available on this web page • https://www.santaclaraca.gov/our-city/departments-g-z/publicworks/environmental-programs/stormwater-pollution-prevention and will be routed to a contract consultant for review.

B4. No construction code review or analysis is being done at this time. The construction permit application drawings submitted to the Santa Clara Building Division shall include an overall California Building Code analysis, including; proposed use and occupancy of all spaces ( CBC Ch. 3), all building heights and areas (CBC Ch. 5), all proposed types of construction (CBC Ch. 6), all proposed fire and smoke protection features, including all types of all fire rated penetrations proposed (CBC Ch. 7), all proposed interior finishes fire resistance (CBC Ch. 8), all fire protection systems proposed (CBC Ch. 9), and all means of egress proposed (CBC Ch. 10). Noncombustible exterior wall, floor, and roof finishes are strongly encouraged.
• During construction retaining a single company to install all fire rated penetrations is highly recommended.
• The grade level lobbies shall be minimum1 hour rated all sides and above. • All stair shafts shall be minimum 1 hour rated.
• All elevator shafts shall be minimum 1 hour rated.
• All trash chute shafts shall be minimuum 1 hour rated. • Recommendation: provide a minimum of two trash chutes; one for recyclables, one for trash, each trash chute to be routed down to a grade level trash collection room.
• Any trash rooms shall be minimum 1 hour rated all sides and above.

B5. The overall project construction permit application shall include the geotechnical, architectural, structural, energy, electrical, mechanical, and plumbing drawings and calculations. Prior to the issuance of the overall project construction permit, a conditions of approval review meeting must be held in city hall, which meeting must be attended by the on-site field superintendent(s). The meeting will not be held without the attendance of the on-site field superintendent(s). The on-site grading permit shall be a separate permit application to the Building Division.

B6. Temporary Certificates of Occupancy (TCO) will not be routinely issued and will be considered on a very limited basis only when there is a clear and compelling reason for city staff to consider a TCO. A TCO will be approved only after all applicable City staff have approved in writing; Planning, Public Works / Engineering, Fire Prevention, Santa Clara Water, Silicon Valley Power, and any other applicable agencies such as the Santa Clara County Health Dept., with the Building Division being the final approval of all TCO.'s.

B7. See Title 15 of the Santa Clara City Code for any amendments to the California Building Codes.

B8. This project is subject to the provisions of the City of Santa Clara 2022 Reach Code, as set forth in City Code Chapters 15.36 and 15.38, with the exception of the “all-electric” requirements suspended by the City Council on January 14, 2025. effective January 2022 See Ordinance No. 2034 and/or Title 15 of the Santa Clara City Code. • Chp. 15.36 – Energy Code for “all electric” provisions for new construction. • Chp. 15.38 – Green Building Code for additional Electric Vehicle Charging requirements for new construction.

3 of 16
1957 Pruneridge Avenue – Conditions of Approval
PLN25-00073

HOUSING & COMMUNITY SERVICES DIVISION
H1. In accordance with the Santa Clara City Code chapter 17.40, this project is subject to the affordable housing requirements and impact fee for the proposed 22 units for-sale residential development. The Applicant shall provide not less than fifteen percent (15%) of the units (or 3.3 units) to affordable households made available at affordable sales prices to extremely low, very low, low and/or moderate-income households as long as the distribution of affordable units averages to a maximum of one-hundred (100) percent of Area Median Income. All prices are set in accordance with the City’s Below Market Purchase (BMP) Program Policies and Procedures Manual (subject to updates and changes). Applicant shall be responsible for cost incurred under the Building Energy Efficiency Standards – Title 24 for the each affordable for- sale residential unit.

Additionally, where the calculation of affordable housing requirements results in a fractional unit, the Applicant shall either pay an In-Lieu Fee or the Applicant shall provide an additional unit to satisfy the requirement. Any in-lieu fee payment due to the City by the Applicant shall be payable prior to the issuance of the certificate of occupancy. The in-lieu fee amount shall be equal to the difference between the unrestricted appraised market value ("Initial Market Value") and the Affordable Sales Price of one of the BMP units at completion, multiplied by the fractional unit. The Initial Market Value of the last BMP unit sold shall be the basis for calculating the in-lieu fee to be paid by Applicant.

H2. Prior to issuance of Building Permits, the Developer shall enter into an Affordable Housing Agreement (AHA) with the City that will determine the Affordable Sales Price for the Affordable Units at Lot 14, 15 and 22, and apply all terms and covenants guaranteeing the prescribed affordability. Satisfaction of the affordable housing obligation shall be memorialized in the AHA and subject to City Council approval. There will be a fee for the preparation of the AHA in the amount of $4,020 which will be due prior to execution of the AHA. Please note all fees are based on the current Municipal Fee Schedule in effect at the time the project is approved

PLANNING DIVISION
P1. Submit plans for final architectural review to the Planning Division for Architectural Committee review and approval prior to issuance of building permits. Said plans to include, but not be limited to: site plans, floor plans, elevations, landscaping, irrigation plan, signage, and stormwater management plan.

P2. The Developer must provide third party verification of the stormwater management plan for conformance with C3 requirements as part of the architectural submittal.

P3. Submit complete landscape plans, including irrigation plan and composite utility and tree layout overlay plan, for Planning Department review and approval with installation of required landscaping prior to the issuance of occupancy and or final building permits.

Landscape plan to include type and size of proposed trees. Type and size of tree replacement on project site shall be at the direction of the City Arborist and require Planning review and approval. Coordinate with the Street Department and City Arborist for the type, location, installation and maintenance of street trees fronting the project site along the public right-of-way. Installation of root barriers and super-soil may be required with the installation of trees where electric, water, and sewer utilities are in proximity.

P4. The overlay plan is to show the location of all utilities, storm drains, catch basins, sewer mains, joint trenches, building footprints, driveways, walkways, and trees. Trees are required to be 10 feet from public water, storm and sewer facilities unless a City approved Tree Root Barrier (TRB) is used. If a City approved TRB is used the TRB must be a minimum of five feet from the public water, storm and sewer facility with the tree behind the TRB and specified on the plan. Landscaping installation shall meet City water conservation criteria in a manner acceptable to the Director of Planning and Inspection. 4 of 16
1957 Pruneridge Avenue – Conditions of Approval
PLN25-00073
P5. Developer shall construct a complete street section along the project frontage of Pruneridge Avenue to include a 5-foot landscape strip with 4.5-feet of clear planting width and a 5-foot sidewalk behind the landscape strip. The landscape strip is to include trees (minimum 24-inch box) and drought tolerant plantings.

P6. Submit as-built on-site plans prepared by a registered civil engineer showing all utilities serving the subject property.

P7. Obtain required permits and inspections from the Building Official and comply with the conditions thereof. As this project involves land area of one acre or more, the Developer shall file a Notice of Intent (NOI) with the State Water Resources Control Board prior to issuance of any building permit for grading, or construction; a copy of the NOI shall be sent to the City Building Inspection Division. A stormwater pollution prevention plan is also required with the NOI.

P8. The Developer shall submit a truck hauling route for demolition, soil, debris and material removal, and construction to the Director of Community Development for review and approval prior to the issuance of demolition and building permits.

P9. Minor changes to individual homes, landscaping, or other minor plan elements would be subject to Planning Division review and approval of a Minor Adjustment to an approved project, or through Architectural Review, subject to the discretion of the Director of Community Development.

P10. Project site landscaping shall be maintained in good condition throughout the life of the Project and no trees shall be removed without City review and approval. Trees permitted by the City for removal shall be replaced at a 2:1 ratio with 24-inch box specimen tree, or equal alternative as approved by the Director of Community Development.

P11. Developer shall submit to the City Covenants, Conditions and Restrictions (CC&R’s) or equivalent instrument assigning and governing perpetual maintenance of the common lots, private street/vehicle access driveway, on-site and street frontage landscaping in good condition for the life of the Project, prior to issuance of building permits. Said document shall be recorded along with the Title for each property with the Santa Clara County Recorder’s Office.

P12. The Covenant, Conditions and Restrictions for this project shall include language that precludes exclusive storage use of the garage and obstruction of parking spaces in the garage by storage, shall and requires property owners to maintain garages for parking purposes.

P13. Garages shall be accessible for parking and labeled as such on the building permit plans.

P14. Overhead garage storage shall be offered as a design option in each of the units.

P15. Provide automatic garage door openers and roll-up garage doors.

P16. Each garage shall be equipped with electrical vehicle charging stations.

P17. HVAC units shall be screened from view along the public right-of-way.

P18. Individual garbage and recycling containers shall be kept out of sight from the public right-of-way and private driveway until collection day.

P19. Applicant shall comply with all the construction and on-going mitigation measures described in the adopted Mitigation Monitoring and Reporting Program (MMRP) to the satisfaction of the Director of Community Development. The Mitigation and Monitoring and Reporting Program shall be included in all construction plan sets.

P20. All exposed surfaces (e.g., parking areas, staging areas, soil piles, graded areas, and unpaved roads) shall be watered two times per day, except on days when rain occurs.

P21. All visible mud or dirt track-out onto the adjacent public right-of-way shall be removed using wet power vacuum street sweeper at least once per day. The use of dry power sweeping shall be prohibited.
5 of 16
1957 Pruneridge Avenue – Conditions of Approval
PLN25-00073
P22. Additional dust and noise abatement measures may be on the project site at the discretion of the Community Development Director to provide additional sound attenuation and fugitive dust abatement as described in the project Mitigation Monitoring and Reporting Program. This may include additional noise monitoring and installation of a temporary noise control blanket barrier, if necessary, along building facades facing construction sites if conflicts occurred which are irresolvable by proper scheduling.

P23. In order to be consistent with the greenhouse gas analysis in the project CEQA documents, no natural gas infrastructure shall be installed on the project site. If the developer seeks to install natural gas infrastructure in the future, the developer must first seek an amendment to the PD zoning.

P24. Developer shall use reasonable efforts, to the satisfaction of the Director of Community Development, to obtain documentation from the Diocese of the previous church on the site, Saint Mark’s, regarding the disposition of the human remains and details as to their new location.

P25. Provide “Right Turn Only During Peak Hours” signage for the project driveway.

P26. Developer to create a memorial to the church (using the Architect William Mays’ name) utilizing materials from the church in the memorial if the church is not relocated.

Developer is to return to the Historical and Landmarks Commission to present the memorial design.

FIRE
F1. Prior to Building Permit Issuance, a Phase II environmental assessment is required to be submitted to CRRD for review. If hazards are present that require site mitigation, cleanup, or management of chemical contaminants in soil, soil vapor, or groundwater a separate permit from one of the regulatory agencies below will be required. The type and extent of contamination on site(s) will govern which of the regulatory agencies noted below can supervise the cleanup:
• Department of Toxic Substances Control (DTSC);
• State Water Resources Control Board; or
• Santa Clara County, Department of Environmental Health.

If the project intends to contract with a State or County Agency for onsite/offsite environmental remediation activities the following documentation shall be provided to the Fire Prevention & Hazardous Materials Division prior to issuance of a Building Permit for demolition or grading: Oversight agency case number; and Oversight mangers contact name, phone number.

F2. Prior to Building Permit Issuance, a permit for Construction Safety & Demolition shall be submitted to the fire department for review and approval in compliance with our Construction Safety & Demolition standard.

F3. Prior to Building Permit Issuance, provide documentation from the City of Santa Clara Water & Sewer Department that the minimum required fire-flow can be met. Fire Department fire-flow will be based on the current California Fire Code. The most restrictive departments requirement shall apply.

F4. Prior to Building Permit Issuance, building plans shall show the required number, location and distribution of fire hydrants for the buildings will be based on the current California Fire Code, Appendix C as amended. The required number of fire hydrants will be based on the fire-flow before the reduction for fire sprinklers. Both public and private fire hydrants may be required.

F5. Prior to Building Permit Issuance, any EVAE’s or fire protection equipment (including but not limited to fire service undergrounds, sprinkler piping, fire alarm equipment, fire 6 of 16
1957 Pruneridge Avenue – Conditions of Approval
PLN25-00073
pumps, ERRCS) that cross property lines or is not located on the parcel of the building it serves shall have a CC&R legally recorded detailing who is responsible for maintenance and repair of the EVAE or fire protection equipment
F6. Prior to any Building Permit issuance, an alternate means or methods permits to mitigate any code deficiency must be submitted and approved. Please submit this permit concurrently with the building plans. Please note specific mitigations may have been discussed during the PCC process. None of these discussions are binding and can only be formally approved through submitting an Alternate Means and Measures (AMM) permit. The AMM permit is formally documenting that and still needs to be submitted.

F7. Please be aware that emergency rescue openings are required for this project per California Residential Code R310 and locations should be on the front or back side of the house (not the side of the house).

PARKS & RECREATION
PR1. This memo assumes the Project is a subdivision and the Quimby Act provisions will apply. The project will generate an estimated 66 residents (2.98 persons/household x 22 units). Based on the Quimby Act standard of 3.0 acres/1000 residents, the amount of public parkland required for this Project to mitigate the impact of the new resident demand is approximately 0.1967-acres. The equivalent fee due in lieu of parkland dedication is therefore $1,378,608.

PR2. Final calculations will depend upon the actual number and type of units and the mix of parkland dedicated and remaining fee due, at the discretion of the City.

PR3. Calculations may change if the number of units change, if any areas do not conform to the Ordinance and City Code Chapter 17.35, and/or if the fee schedule for new residential development fees due in lieu of parkland dedication changes before a project is deemed complete by Planning.

PR4. Dwelling Unit Tax: a dwelling unit tax (DUT) in the amount of $700 is also due based on the number of units and additional bedrooms per City Code Chapter 3.15.

POLICE
PD1. The property should be fenced off during demolition and construction as a safety barrier to the public and deterrent to theft and other crime. Consider not having any screening material on the fence so passing Police Patrol checks will be able to see into the site.

PD2. Address numbers should be a minimum of twelve (12) inches in height for commercial or industrial buildings. Consider illuminated numbers during the hours of darkness, and in a color that is contrasting to the background material. They shall be clearly visible from the street. Where multiple units or buildings occupy the same property, each unit/building address shall be clearly visible. A monument sign, preferably at all entrances to the property, should be prominently displayed showing all unit/building numbers, addresses, etc. A map is recommended for large complexes with multiple streets or walkways.

PD3. If the project includes any benches, these benches should not be longer than 5 feet in length and should have arm rests at both ends. If the benches are longer than 5 feet in length, there should be a divider (arm rest or similar) in the middle of the bench in addition to the arm rests on both ends. This helps prevent unlawful lodging and/or skateboarding. Another option to benches could be cubes, knee walls, or other creative types of seating possibilities.

PUBLIC WORKS

ENGINEERING
E1. Obtain site clearance through Public Works Department prior to issuance of Building Permit. Site clearance will require payment of applicable development fees. Other 7 of 16
1957 Pruneridge Avenue – Conditions of Approval
PLN25-00073
requirements may be identified for compliance during the site clearance process.

Contact Public Works Department at (408) 615-3000 for further information.

E2. All work within the public right-of-way and/or public easement, which is to be performed by the Developer/Owner, the general contractor, and all subcontractors shall be submitted within a Single Encroachment Permit to be reviewed and issued by the City Public Works Department. Issuance of the Encroachment Permit and payment of all appropriate fees shall be completed prior to commencement of work, and all work under the permit shall be completed prior to issuance of occupancy permit.

E3. Submit public improvement/encroachment permit plans prepared in accordance with City Public Works Department procedures which provide for the installation of public improvements directly to the Public Works Department. Plans shall be prepared by a Registered Civil Engineer and approved by the City Engineer prior to approval and recordation of final map and/or issuance of building permits.

E4. All work within City of San Jose right-of-way shall require a City of San Jose encroachment permit.

E5. Existing non-standard or non-ADA compliant frontage improvements shall be replaced with current City standard frontage improvements as directed by the City Engineer or his designee.

E6. Damaged curb, gutter, and sidewalk within the public right-of-way along property’s frontage shall be repaired or replaced (to the nearest score mark) in a manner acceptable to the City Engineer or his designee. The extents of said repair or replacement within the property frontage shall be at the discretion of the City Engineer or his designee.

E7. Developer shall provide a complete storm drain study for the 10-year and 100-year storm events. The grading plans shall include the overland release for the 100-year storm event and any localized flooding areas. System improvements, if needed, will be at developer’s expense.

E8. All storm drain mains and laterals, sanitary sewer mains and laterals shall be outside the drip line of mature trees or 10’ clear of the tree trunk whichever is greater.

E9. Provide root barriers when the drip line of the mature trees covers the sidewalk. Root barriers for sidewalk protection shall be 16' long or extend to drip line of the mature tree, whichever is greater, and be 1.5' deep, and centered on trees. Root barriers for curb and gutter protection shall be 16' long or extend to drip line of the mature tree, whichever is greater, and be 2’ deep, and centered on trees.

E10. Existing streetlights shall be clear of proposed sidewalk, developer shall relocate as necessary.

E11. If requested, Developer/property owner shall prepare and submit for City approval a maintenance plan for all sidewalk, curb and gutter, landscaping and irrigation system improvements installed within the public right-of-way prior to encroachment permit issuance. Such plan shall include at a minimum, maintenance requirements for trees and shrubs, in acknowledgement of developer’s/property owner’s obligation under Chapter 12.30 and 17.15.

E12. Dedicate required on-site easements for any new public utilities, and/or emergency vehicle access by means of subdivision map or approved instrument at time of development.

E13. Dedicate sidewalk easements along the project frontage where public sidewalks extend into private property. Sidewalk easements are to be 1’ behind proposed back of walk where there is landscaping behind sidewalk. Sidewalk easement where hardscape is behind sidewalk is to be at back-of-walk. Cold joint is required between public sidewalk and private hardscape.

E14. Onsite pathways shall be dedicated as private easements, as needed. 8 of 16
1957 Pruneridge Avenue – Conditions of Approval
PLN25-00073
E15. After City Council approval of the Tentative Map, submit the Subdivision Map, prepared by a Licensed Land Surveyor or a Registered Civil Engineer with Land Surveyor privileges to the Engineering Department. The submittal shall include a title report, closure calculations, and all appropriate fees.

E16. Pavement treatment shall be 2” grind and overlay with dig-outs for the full street width of Pruneridge Avenue.

E17. Traffic improvements must comply with the City of Santa Clara Standard Specifications for Public Works Construction
E18. Residential bicycle parking shall be a minimum of 8 Class I spaces (one per 3 dwelling units) and 2 Class II spaces (one per 15 dwelling units) per 2007 VTA Bicycle Technical Guidelines.

E19. Class I and Class II bicycle parking, as defined in SCMC 18.74.075, shall be conveniently accessible from the street, within 200 feet of a building entrance and/or highly visible areas.

E20. Submit Vehicle Miles Travel and vehicle trip calculations in accordance with the City transportation policy:
https://www.santaclaraca.gov/our-city/departments-g-z/public-works/engineering/trafficengineering/transportation-analysis-policy-update E21. Conduct a trip generation analysis for the project. A local transportation analysis (LTA) will be required if the project generates over 100 net new trips.

E22. Landscape improvements within 10 feet of a driveway must be less than 3 feet or greater than 10 feet per City Standard Detail TR-9.

E23. All on-site structures (including fences) must be clear of Driveway Visibility Clearance Areas per City Standard Detail TR-9.

E24. Replace unused/abandoned driveways with new curb, gutter, and sidewalk.

E25. Design and construct driveway in accordance with City Standard Detail ST-8.

STREETS DIVISION
Landscape
L1. Include City of Santa Clara Tree Preservation/City Arborist specifications on all improvement plans.

L2. No cutting of any part of public trees, including roots, shall be done without securing prior approval of the City Arborist. Tree trimming/removal shall be done in accordance to the City of Santa Clara Tree Preservation/City Arborist specifications and with direct supervision of a certified arborist (Certification of International Society of Arboriculture).

L3. Identified existing mature trees to be maintained. Prepare a tree protection plans for review and approval by the City of Santa Clara prior to any demolition, grading or other earthwork in the vicinity of existing trees on the site.

Solid Waste
SW1. The applicant shall complete and provide the Post-Construction Solid Waste Generation Estimation and Collection Form, which includes the estimation of trash and recycling materials generated from the project. Use the City’s Solid Waste Guidelines for New and Redevelopment Projects as specified by the development type. Contact the Public Works Department at [email protected] or (408) 615-3080 for more information. All collection is to occur on private property using individual toters.

SW2. The applicant shall provide a site plan showing all proposed locations of solid waste containers, chutes, compactors, trash enclosures and trash staging areas. The site plan shall show the route or access for trash and recycling collectors (trucks) including vertical clearance, turning radius and street/alley widths. All plans shall comply with the City’s Solid Waste Guidelines.
9 of 16
1957 Pruneridge Avenue – Conditions of Approval
PLN25-00073
SW3. For projects that involve construction, demolition or renovation of 5,000 square feet or more, the applicant shall comply with City Code Section 8.25.285 and recycle or divert at least sixty five percent (65%) of materials generated for discard by the project during demolition and construction activities. No building, demolition, or site development permit shall be issued unless and until applicant has submitted a construction and demolition debris materials check-off list. Applicant shall create a Waste Management Plan and submit, for approval, a Construction and Demolition Debris Recycling Report through the City’s online tracking tool at http://santaclara.wastetracking.com/ .

SW4. Prior to obtaining a Temporary or Final Certificate of Occupancy, individual weight tickets for all materials generated for discard or reuse by the project during demolition and construction activities shall be uploaded to Green Halo and submitted for review and approval by Environmental Services. At a minimum two (2) weeks review time is required.

SW5. This project is subject to the City’s Accumulation, Transportation and Disposal of Solid Waste Ordinance (Chapter 8.25 of the Municipal Codes), which requires the handling and disposal of waste by authorized service haulers. Insert the General Notes for the Construction & Demolition (C&D) Waste Management into construction plans in accordance with the City’s municipal codes prior to the issuance of a Building or Grading permit. Provide the Green Halo waste online tracking number to Building staff prior to the issuance of a demolition or building permit.

SW6. Project applicant shall contact the Public Works Department, Street Maintenance Division at (408) 615-3080 to verify if the property falls within the City’s exclusive franchise hauling area. If so, the applicant is required to use the City’s exclusive franchise hauler and rate structure for any hired debris boxes. Prior to the issuance of a Public Works clearance, the project applicant shall complete and sign the Construction and Demolition (C&D) / Waste Management Rules and Regulations Form.

SW7. All refuse from all residential, commercial, industrial and institutional properties within the city shall be collected at least once a week, unless otherwise approved in writing (SCCC

8.25.120). Garbage service level required for residential developments (single-family and multi-family) as well as motels and hotels shall be no less than twenty (20) gallons per unit. All project shall submit to the Public Works Department the preliminary refuse service level assessment for approval.

Stormwater
ST1. Prior to City’s issuance of Building or Grading Permits, the applicant shall develop a Final Stormwater Management Plan, update the C.3 Data Form, the Special Project Narratives and Worksheet (as appropriate), and an Erosion and Sediment Control Plan.

ST2. The Final Stormwater Management Plan and all associated calculations shall be reviewed and certified by a qualified 3rd party consultant from the SCVURPPP List of Qualified Consultants, and a 3rd party review letter shall be submitted with the Plan.

ST3. For project that disturbs a land area of one acre or more, the applicant shall provide a copy of the Notice of Intent (NOI) with WDID number for coverage under the State Construction General Permit. Active projects with NOI will be inspected by the City once per month during the wet season (October – April).

ST4. The applicant shall incorporate Best Management Practices (BMPs) into construction plans and incorporate post-construction water runoff measures into project plans. Include the SCVURPPP Countywide Construction BMPs Plan Sheet with the plans.

ST5. Include the C.3 Treatment Facilities Construction Notes on the Improvement Plans and/or Stormwater Control Plans.

ST6. During the construction phase, all stormwater control measures shall be inspected for conformance to approved plans by a qualified 3rd party consultant from the SCVURPPP 10 of 16
1957 Pruneridge Avenue – Conditions of Approval
PLN25-00073
List of Qualified Consultants, and a 3rd party concurrence letter on the C.3 facilities construction shall be submitted to the Public Works Department. The City reserves the right to review the 3rd party inspection reports on the C.3 stormwater facilities installation.

ST7. Applicant shall install biotreatment soil media that meets the minimum specifications as set forth in the SCVURPPP C.3 Stormwater Handbook. If percolation rate test of the biotreatment soil mix is not performed on-site, a certification letter from the supplier verifying that the soil meets the specified mix (the date of such document shall not be older than 3 months).

ST8. As-Built drawing shall be submitted to the Public Works Department. Include C.3 Stormwater Treatment Facilities Construction general notes on the improvement plans.

ST9. Permeable Pavement, Media Filter vaults, Interceptor Trees and Trash Full Capture Devices shall be inspected by a third-party reviewer and/or manufacturer representative for conformance with the details and specifications. If necessary, percolation test shall be performed to ensure proper installation. A map displaying the number, location and details of full trash capture devices shall be prepared as an attachment to the Operations and Maintenance (O&M) Agreement with the City.

ST10. Stormwater treatment facilities must be designed, installed, and maintained to achieve the site design measures throughout their life in accordance to the SCVRUPPP C.3 Stormwater Handbook (Chapter 6 and Appendix C).

ST11. The property owner shall enter into an Operation and Maintenance (O&M) Agreement with the City for all installed stormwater treatment measures and full trash capture devices in perpetuity. Applicants should contact Public Works Department. - Environmental Services at (408) 615-3080 or [email protected] for assistance completing the Agreement. For more information and to download the most recent version of the O&M Agreement, visit the City’s stormwater resources website at http://santaclaraca.gov/stormwater. Inspection of permeable pavement, media filter vaults and full trash capture devices is to be done annually by December 31 of each year.

ST12. Any site design measures used to reduce the size of stormwater treatment measures shall not be installed for the project without the written approval from the City, installing the corresponding resizing of other stormwater treatment measures and an amendment of the property’s O&M Agreement.

ST13. For single-family homes and other small projects that create and/or replace 2,500 – 10,000 square feet of impervious surface area, the applicant shall implement at least one of the following site design measures:
a. Direction of roof runoff into cisterns or rain barrels b. Direction of roof, sidewalk, walkway, patio, driveway, or parking lot runoff onto vegetated areas
c. Construction of sidewalks, walkways, patios, bike lanes, driveways, and parking lots with permeable surfaces
Plans shall specify which site design measures are selected for the project and show the direction of flow from impervious surfaces to the selected site design measures. All measures shall meet the design criteria in the 2016 C.3. Stormwater Handbook, Appendix K: Standard Specifications for Lot-Scale Measures for Small Projects.

ST14. Developer shall install an appropriate stormwater pollution prevention message such as “No Dumping – Flows to Bay” on any storm drains located on private property.

ST15. Interior floor drains shall be plumbed to the sanitary sewer system and not connected to the City’s storm drain system.

ST16. Floor drains within trash enclosures shall be plumbed to the sanitary sewer system and not connected to the City’s storm drain system.
11 of 16
1957 Pruneridge Avenue – Conditions of Approval
PLN25-00073
ST17. All outdoor equipment and materials storage areas shall be covered and/or bermed, or otherwise designed to limit the potential for runoff to contact pollutants.

ST18. Decorative and recreational water features such as fountains, pools, and ponds shall be designed and constructed to drain to the sanitary sewer system only.

ST19. The use of architectural copper is discouraged. If such material is used, all wastewater generated by the installation, cleaning, treating, or washing of the surface of copper architectural features, including copper roofs, shall not be discharged to the City’s storm drain system.

SILICON VALLEY POWER
EL1. Drive Aisle A should be a 10’ U.G.E.E if its only for electric and public tv and cable companies. Install a joint trench with public tv and cable conduits 1’ away from the SVP conduits. This clearance only applies if all conduits are installed at the same time.

Reference UG1000 standard for joint trench configuration. Phone and cable conduits should be placed on the side closer to the trees.

EL2. Any streetlight foundations that conflict with the new location of the SVP trench along Pruneridge Ave, will need to be relocated further back from the front of curb.

EL3. All streetlighting, low voltage, and fiber systems are to be designed during detailed design.

EL4. All tie-in points shown on the utility plan along with electrical substructure will be needed prior to the removal of the overhead power lines.

EL5. All electrical laterals serving parcels on the south side of Drive Aisle A may need easements if it’s a private roadway. All easements for SVP should be a U.G.E.E (underground electric easement).

EL6. Clearances: (Make sure job notes do not conflict with SVP clearance requirements) a. EQUIPMENT
i.Ten (10) foot minimum clearance is required in front of equipment access doors. (UG1000 sheet 11)
ii.Five (5) foot minimum clearance from pad is required on sides without equipment access doors. (UG1000 sheet 11)
iii.Eighteen (18) foot minimum width, shall be provided and maintained on one side of the equipment pad to allow an electric dept. line truck to drive up next to the pad for installation and maintenance of equipment. (UG1000 Sheet 11).
iv.Barrier pipes are required only on sides accessible to vehicles. (UG1000 Sheet 12).

1. Thirty (30) inches from side of equipment sides.

2. Forty Eight (48) inches in front of access doors.
a. Barrier Pipes in front of access doors shall be removable. b. CONDUITS
i.Five (5) foot minimum longitudinal clearance between new conduits or piping systems (open trench installation) and any existing or proposed SVP conduit system. This is for longitudinal. (UG1250 sheet 5) ii.Twelve (12) inch minimum vertical clearance between new conduit/pipes installed perpendicular to existing SVP conduits for open trench installations. (UG1000 sheet 36, UG1250 Sheet 6)
iii.Three (3) foot six (6) inches clearance is required from poles for open trench installation. Exceptions are for riser conduit. (UG1250 Sheet 7) iv.Three (3) foot minimum clearance is required between sign-posts, barrier pipes or bollards, fence posts, and other similar structures. (UG1250 sheet 10).
12 of 16
1957 Pruneridge Avenue – Conditions of Approval
PLN25-00073
v.Five (5) foot minimum from new splice boxes, pull boxes, manholes, vaults, or similar subsurface facilities. (UG1000 sheet 8)
vi.Five (5) foot minimum clearance from walls, footings, retaining wall, landscape planter, tree root barrier or other subsurface wall or structure. (UG1250 sheet 9).
vii.Five (5) foot minimum clearance is required between fire hydrant thrust block. The thrust block extends 5’ foot on either side of the fire hydrant in line with the radial water pipe connected to the hydrant. c. VAULTS/MANHOLES
i.Ten (10) foot minimum clearance is required between adjacent Vaults or Manholes.
ii.Five (5) foot minimum clearance is required between adjacent conduits. iii.Minimum 36” from face of curb, or bollards required. d. Poles (Electrolier, Guy Stub poles, service clearance poles, self-supporting steel poles and lighting poles.)
i.Three (3) foot six (6) inches clearance is required from poles for open trench installation. Exceptions are for riser conduit. (UG1250 Sheet 7) e. Guy Anchors
i.Five (5) foot minimum clearance is required between center of anchor line and any excavation area. (UG1250 sheet 15).
f. Trees
i.OH 1230 for Overhead Lines
ii.SD 1235 for Tree Planting Requirements near UG Electric Facilities EL7. Reference listed SVP standards for clearances.
a. Installation of Underground Substructures by Developers b. UG1250 – Encroachment Permit Clearances from Electric Facilities c. UG0339 – Remote Switch Pad
d. OH1230 – Tree Clearances From Overhead Electric Lines e. SD1235 – Tree Planting Requirements Near Underground Electric Facilities EL8. Prior to submitting any project for Electric Department review, applicant shall provide a site plan showing all existing utilities, structures, easements and trees. Applicant shall also include a “Load Survey” form showing all current and proposed electric loads. A new customer with a load of 500KVA or greater or 100 residential units will have to fill out a “Service Investigation Form” and submit this form to the Electric Planning Department for review by the Electric Planning Engineer. SVP will do exact design of required substructures after plans are submitted for building permits.

EL9. The Developer shall provide and install electric facilities per Santa Clara City Code chapter 17.15.210.

EL10. Electric service shall be underground. See Electric Department Rules and Regulations for available services.

EL11. Installation of underground facilities shall be in accordance with City of Santa Clara Electric Department standard UG-1000, latest version, and Santa Clara City Code chapter 17.15.050.

EL12. Underground service entrance conduits and conductors shall be “privately” owned, maintained, and installed per City Building Inspection Division Codes. Electric meters and main disconnects shall be installed per SVP Standard MS-G7, Rev. 2.

EL13. The developer shall grant to the City, without cost, all easements and/or right of way necessary for serving the property of the developer and for the installation of utilities (Santa Clara City Code chapter 17.15.110).

EL14. If the “legal description” (not “marketing description”) of the units is condominium or apartment, then all electric meters and services disconnects shall be grouped at one 13 of 16
1957 Pruneridge Avenue – Conditions of Approval
PLN25-00073
location, outside of the building or in a utility room accessible directly from the outside. If they are townhomes or single-family residences, then each unit shall have its own meter, located on the structure. A double hasp locking arrangement shall be provided on the main switchboard door(s). Utility room door(s) shall have a double hasp locking arrangement or a lock box shall be provided. Utility room door(s) shall not be alarmed.

EL15. If transformer pads are required, City Electric Department requires an area of 17’ x 16’- 2”, which is clear of all utilities, trees, walls, etc. This area includes a 5’-0” area away from the actual transformer pad. This area in front of the transformer may be reduced from an 8’-0” apron to a 3’-0”, providing the apron is back of a 5’-0” min. wide sidewalk. Transformer pad must be a minimum of 10’-0 from all doors and windows, and shall be located next to a level, drivable area that will support a large crane or truck.

EL16. All trees, existing and proposed, shall be a minimum of five (5) feet from any existing or proposed Electric Department facilities. Existing trees in conflict will have to be removed. Trees shall not be planted in PUE’s or electric easements.

EL17. Any relocation of existing electric facilities shall be at Developer’s expense.

EL18. Electric Load Increase fees may be applicable.

EL19. The developer shall provide the City, in accordance with current City standards and specifications, all trenching, backfill, resurfacing, landscaping, conduit, junction boxes, vaults, street light foundations, equipment pads and subsurface housings required for power distribution, street lighting, and signal communication systems, as required by the City in the development of frontage and on-site property. Upon completion of improvements satisfactory to the City, the City shall accept the work. Developer shall further install at his cost the service facilities, consisting of service wires, cables, conductors, and associated equipment necessary to connect a customer to the electrical supply system of and by the City. After completion of the facilities installed by developer, the City shall furnish and install all cable, switches, street lighting poles, luminaries, transformers, meters, and other equipment that it deems necessary for the betterment of the system (Santa Clara City Code chapter 17.15.210 (2)).

EL20. Electrical improvements (including underground electrical conduits along frontage of properties) may be required if any single non-residential private improvement valued at $200,000 or more or any series of non-residential private improvements made within a three-year period valued at $200,000 or more (Santa Clara City Code Title 17 Appendix A (Table III)).

EL21. Non-Utility Generator equipment shall not operate in parallel with the electric utility, unless approved and reviewed by the Electric Engineering Division. All switching operations shall be “Open-Transition-Mode”, unless specifically authorized by SVP Electric Engineering Division. A Generating Facility Interconnection Application must be submitted with building permit plans. Review process may take several months depending on size and type of generator. No interconnection of a generation facility with SVP is allowed without written authorization from SVP Electric Engineering Division.

EL22. Encroachment permits will not be signed off by SVP until Developers Work substructure construction drawing has been completed.

EL23. All SVP-owned equipment is to be covered by an Underground Electric Easement (U.G.E.E.) This is different than a PUE. Only publicly-owned dry utilities can be in a UGEE. Other facilities can be in a joint trench configuration with SVP, separated by a 1’ clearance, providing that they are constructed simultaneously with SVP facilities. See UG 1000 for details.

EL24. Proper clearance must be maintained from all SVP facilities, including a 5’ clearance from the outer wall of all conduits. This is in addition to any UGEE specified for the facilities. Contact SVP before making assumptions on any clearances for electric facilities.
14 of 16
1957 Pruneridge Avenue – Conditions of Approval
PLN25-00073
EL25. Transformers and Switch devices can only be located outdoors. These devices MAY be placed 5’ from an outside building wall, provided that the building wall in that area meets specific requirements. (See UG 1000 document for specifics) EXAMPLE: If there are any doors, windows, vents, overhangs or other wall openings within 5’ of the transformer, on either side, then the transformer MUST be 10’ or more away from the building. These clearances are to be assumed to be clear horizontally 5’ in either direction and vertically to the sky.

EL26. All existing SVP facilities, onsite or offsite, are to remain unless specifically addressed by SVP personnel by separate document. It is the Developers responsibility to maintain all clearances from equipment and easements. Developer to contact SVP outside of the PCC process for clear definitions of these clearance requirements. Developer should not assume that SVP will be removing any existing facilities without detailed design drawings from SVP indicating potential removals. Simply indicating that SVP facilities are to be removed or relocated on conceptual plans does not imply that this action has been approved by SVP.

EL27. SVP does not utilize any sub-surface (below grade) devices in its system. This includes transformers, switches, etc.

EL28. All interior meter rooms at ground level are to have direct, outside access through only ONE door. Interior electric rooms must be enclosed in a dedicated electric room and cannot be in an open warehouse or office space.

EL29. High Rise Metering and Multi-Floor Infrastructure Requirements a. Refer to UG0250 – High Density Residential Metering Requirements b. Refer to FO-1901 – Fiber Optic Splicing and Testing Methods EL30. In the case of podium-style construction, all SVP facilities and conduit systems must be located on solid ground (aka “real dirt”) and cannot be supported on parking garage ceilings or placed on top of structures.

EL31. Applicant is advised to contact SVP (CSC Electric Department) to obtain specific design and utility requirements that are required for building permit review/approval submittal. Please provide a site plan to Leonard Buttitta at 408-615-6620 to facilitate plan review.

EL32. In events where electric load demand exceeds 2MVA or service size exceeds 4000 Amps at 480V for a building, the Customer shall take service at 12KV. If electric load for a single metered location service exceeds 4.5MVA, additional 12KV service(s) may be provided. All 12KV utility connection points terminate at the Customer Switchgear.

UGEE easement up to the Customer Switchgear is required, along with an 18’ drivable space. 10’ working clearance is required in front of and behind the switchgear. 5’ working clearance is required on the sides of the switchgear (with no panels). Customer 12KV Switchgear must be located outdoors on “real dirt” unless otherwise agreed upon with SVP. SVP owns and maintains the cable/conduit up to the customer switchgear.

EL33. In events where electric service is provided at 120/208V or 277/480V the utility connection point is at the secondary compartment of SVP transformers. Customer owns and maintains the cable and conduits up to the SVP transformers.

EL34. No cross-parcel distribution is allowed. SVP service points must be within the parcels that they serve.

WATER & SEWER
W1. Recycled Water Ready: All onsite plumbing for non-domestic water uses (e.g. irrigation, industrial processes, cooling, etc.) shall be designed for recycled water use and shall comply with all Recycled Water regulations.

W2. Encroachment Permit: Prior to issuance of Building Permits, the applicant shall submit an encroachment permit application and design plans for construction of water utilities 15 of 16
1957 Pruneridge Avenue – Conditions of Approval
PLN25-00073
that comply with the latest edition of the Water & Sewer Utilities Water Service and Use Rules and Regulations, Water System Notes, and Water Standard Details and Specifications. In addition, prior to the City's issuance of Occupancy, the applicant shall construct all public water utilities per the approved plans. The Water & Sewer Utilities will inspect all public water utility installations and all other improvements encroaching public water utilities.

W3. Utility Design Plans: Utility Design Plans shall indicate the pipe material and the size of existing water, recycled water and sewer main(s). The plans shall show the nearest existing fire hydrant and the two nearest existing water main line gate valves near the project area. The plans shall show meter and backflow configurations to scale and per City of Santa Clara Water & Sewer Utilities Standard Details. Note that all new water meters and backflow prevention devices shall be located behind the sidewalk in a landscape area. Fire hydrants should be located two feet behind monolithic sidewalk if sidewalk is present; two feet behind face of curb if no sidewalk is present, per City Std Detail 18. The plans shall provide the profile section details for utilities crossing water, sewer, or recycled water mains to ensure a 12” minimum vertical clearance is maintained.

W4. Utility Separations: Applicant shall adhere to and provide a note indicating that all horizontal and vertical clearances comply with State and local regulations. The applicant shall maintain a minimum 12” of vertical clearance at water service crossing with other utilities, and all required minimum horizontal clearances from water services:
10' from sanitary sewer utilities, 10’ from recycled water utilities, 8' from storm drain utilities, 5' from fire and other water utilities, 3' from abandoned water services, 5' from gas and electric utilities, and 5’ from the edge of the propose or existing driveway. For sanitary sewer, water, and recycled water utilities, the applicant shall maintain a minimum horizontal clearance of 10' from existing and proposed trees. If applicant installs tree root barriers, clearance from tree reduces to 5' (clearance must be from the edge of tree root barrier to edge of water facilities). No structures (fencing, foundation, biofiltration swales, etc.) allowed over sanitary sewer, potable water and/or recycled water utilities and easements.

W5. Separate Services: Applicant shall submit plans showing proposed water, recycled water, sanitary sewer, and fire services connected to a public main in the public right-ofway to the satisfaction of the Director of Water & Sewer Utilities. Different types of water and recycled water use (domestic, irrigation, fire) shall be served by separate water services, each separately tapped at the water main. Tapping on existing fire service line(s) is prohibited. Approved backflow prevention device(s) are required on all potable water services.

W6. City Standard Meters and Backflows: All proposed meters and backflows for all water services shall meet the current City of Santa Clara Water & Sewer Utilities Standard Details. Plans shall show meter and backflow configurations to scale.

W7. Existing Services: The applicant must indicate the disposition of all existing water and sewer services and mains on the plans. If the existing services will not be used, then the applicant shall properly abandon these services to the main per Water & Sewer Utilities standards and install a new service to accommodate the water needs of the project. The applicant shall bear the cost of any relocation or abandonment of existing Water Department facilities required for project construction to the satisfaction of the Director of Water and Sewer Utilities.

W8. On-Site Storm Drain Treatment: Prior to issuance of Building Permit, the applicant shall submit plans showing any onsite storm water treatment system. The plan shall include a section detail of the treatment system. No water, sewer, or recycled water facilities shall be located within 5-feet of any storm water treatment system. 16 of 16
1957 Pruneridge Avenue – Conditions of Approval
PLN25-00073
W9. Water Usage: Prior to the issuance of Building Permits, the applicant shall provide documentation of water usage so the Water Division can verify the appropriate size of all proposed water meters. Please note that if the existing water services are incapable of supplying the water needs to the site, the existing services shall be abandoned, and new separate dedicated water services shall be provided for each use (domestic and irrigation).

W10. Landscaping: All the landscaping for the project shall comply with the California Water Conservation in Landscaping Act, Government Code Section 65591 et. seq. All plants shall be either California native or non-invasive, low water-using or moderate waterusing plants. High water-using plants and nonfunctional turf are prohibited.

W11. Prior to issuance of Building Permits, the applicant shall submit plan details for all water features (including but not limited to fountains and ponds) designed to include provisions for operating the system without City potable water supply and capable of being physically disconnected from source of potable water supply during City declared water conservation periods, to the satisfaction of the Director of the Water & Sewer Utilities. Decorative water features may be permanently connected to the City’s recycled water supply.

W12. Easements: Prior to City’s issuance of Building or Grading Permits, the applicant shall provide a dedicated water utility easement around the backflow prevention device onsite. The water utility easement for the water services and all other public water appurtenances shall be a minimum 15 feet wide and be adjacent to the public right-ofway without overlapping any public utility easement. Additionally, the applicant shall submit plans defining existing easements so Water Division can verify if there are any conflicts with proposed easements and water utilities.

W13. Underground Fire Permit: Prior to issuance of Building Permits, applicant shall submit an underground fire permit unless otherwise waived by the Fire Department. If fire flow information is needed, applicant shall coordinate with Water and Sewer Utilities Department, for fire flow information at (408)615-2000. A dedicated fire service line, with an approved backflow prevention device, shall be used for on-site fire hydrants.

Fire service lines required for commercial and industrial use shall be sized appropriately per fire flow demand and code requirements.

W14. Record Drawings: Upon completion of construction and prior to the City’s issuance of a Certificate of Occupancy, the applicant shall provide "as-built" drawings of the public water utility infrastructure prepared by a registered civil engineer to the satisfaction of the Director of Water & Sewer Utilities Department.

W15. Water Shortage Response Actions: Pursuant to the City of Santa Clara’s Urban Water Management Plan, during times of drought or water shortage, the City implements water shortage response actions in accordance with the level of water shortage declared. All construction activities and all new irrigation connections are subject to the Water Shortage Response Actions in effect at the time of construction and connection of the irrigation service.

Water Shortage Response Actions for Stage 2 and higher include water use restrictions that limit the use of potable water such as:
a. prohibiting the installation of new potable water irrigation services. new irrigation connections, construction, and dust control.
b. restrict the use of potable water used for construction and dust control if recycled water is available.

This project is subject to all the requirements and restrictions of the Water Shortage Response Actions in place or adopted during the duration of the project. For more information, visit the City of Santa Clara Water & Sewer Utilities website at www.santaclaraca.gov/waterconservation .
17 of 16
1957 Pruneridge Avenue – Conditions of Approval
PLN25-00073

ACKNOWLEDGEMENT AND ACCEPTANCE OF CONDITIONS OF APPROVAL Permittee/Property Owner
The undersigned agrees to each condition of approval and acknowledges and hereby agrees to use the project property on the terms and conditions set forth in this permit.

Signature: _________________________________________________ Printed Name: _________________________________________________ Relationship to Property: _________________________________________________ Date: _________________________________________________ Pursuant to Santa Clara City Code 18.128.100, the applicant shall return this document to the Department, properly signed and dated, within 30-days following the date of the Acknowledgement.

Resolution/ 1957 Pruneridge Avenue Residential Project – MND and MMRP Page 1 of 4 Rev: 7/27/2023
RESOLUTION NO. __________

A RESOLUTION OF THE CITY OF SANTA CLARA,

CALIFORNIA TO ADOPT THE MITIGATED NEGATIVE

DECLARATION AND THE MITIGATION MONITORING AND

REPORTING PROGRAM FOR THE PROPOSED AMENDMENT

TO THE APPROVED RESIDENTIAL PLANNED
DEVELOPMENT (PD) (PLN22-00505) LOCATED AT 1957

PRUNERIDGE AVENUE, SANTA CLARA
PLN25-00073 (Rezone)
WHEREAS, On February 19, 2025, SCS Development (“Owner”) filed an application for the development of a 2.47-acre site located at 1957 Pruneridge Avenue, Santa Clara (“Project Site”);
WHEREAS, the Project Site has a General Plan designation of Very Low Density Residential and is zoned Planned Development (PD);
WHEREAS, On March 19, 2024, the City Council approved the Owner’s request to rezone the subject property from Public, Quasi-Public, and Public Park or Recreation (B) to Planned Development (PD) to construct the residential development with 22 detached two-story allelectric homes, private street and associated on- and-off-site improvements, and a Vesting Tentative Subdivision Map to subdivide the property into individual for-sale lots and four common lots for use as a utility corridor, vehicle access, landscape open space and bioretention areas (Approved PD);
WHEREAS, On March 19, 2024, City Council certified an Environmental Impact Report and adopted the CEQA Findings, Statement of Overriding Considerations, and the Mitigation Monitoring and Reporting Program for the 1957 Pruneridge Avenue Residential Project (Approved PD);
WHEREAS, on February 19, 2025, the Owner applied to amend the Approved PD to replace the approved electric stovetop appliances in the project with natural gas stovetop appliances (“Project”) for each unit;
Resolution/ 1957 Pruneridge Avenue Residential Project – MND and MMRP Page 2 of 4 Rev: 7/27/2023
WHEREAS, in accordance with the Condition of Approval P23 of the Approved PD, installation of natural gas infrastructure requires an amendment to the Approved PD zoning, and review by the Planning Commission and approval by Council;
WHEREAS, to analyze the proposal to allow for the use of natural gas by replacing the approved electric stovetops in the project with natural gas stovetop appliances, the City, as Lead Agency, in tandem with Consultant ‘David J. Powers’ prepared an Initial Study (“IS”) and a Mitigated Negative Declaration for the proposed project in accordance with the California Environmental Quality Act (“CEQA”), which was circulated for a 20-day review to public agencies which have jurisdiction by law with respect to the Project, as well as to other interested persons and agencies, and the City sought the comments of such persons and agencies beginning on July 18, 2025 and concluding on August 7, 2025 (“Comment Period”); and WHEREAS, a Mitigation Monitoring and Reporting Program (“MMRP”) has been prepared for implementation with Project development to reduce potentially significant impacts identified in the Initial Study to less than significant; and
WHEREAS, the City through consultant ‘David J. Powers’ prepared written responses to the comments received during the Comment Period and included these responses on the project’s CEQA page; and
WHEREAS, on October 8, 2025, the Planning Commission held a duly noticed public hearing, at the conclusion of which, the Planning Commission recommended approval (6-0-0) of the Mitigated Negative Declaration, the Mitigation Monitoring and Reporting Program, and Amendment to the Approved Residential PD;
WHEREAS, on September 15, 2025, the notice of public hearing for the November 18, 2025, Cit Council Hearing for this item was mailed to property owners within a 1,000-foot radius of the Project Site boundaries; and
Resolution/ 1957 Pruneridge Avenue Residential Project – MND and MMRP Page 3 of 4 Rev: 7/27/2023
WHEREAS, pursuant to SCCC Section 18.146.020, on November 7, 2025, notices of the public hearing of November 18, 2025, were posted at City Hall, the Central Park Library, the Mission Branch Library, the Northside Branch Library, and on the City’s website; and WHEREAS, on November 18, 2025, the City Council held a duly noticed public hearing to consider the Project, the MND, the MMRP, and all pertinent information in the record during which the Council invited and considered any and all verbal and written testimony and evidence offered in favor of and in opposition to the Project.

NOW THEREFORE, BE IT RESOLVED BY THE CITY OF SANTA CLARA AS FOLLOWS:

1. That the City Council hereby finds that the above Recitals are true and correct and by this reference makes them a part hereof.

2. That the City Council hereby finds that all potentially significant environmental impacts that may directly or indirectly result from the Project would be reduced to a less than significant level by implementation of the mitigation measures specified in the MND and MMRP.

3. That the City Council hereby finds that the MND is complete, prepared in compliance with CEQA, and represents the independent judgment of the City Council.

4. That the City Council hereby finds that approval of this Project as mitigated will have no significant negative impacts on the area’s environmental resources, cumulative or otherwise, as the impacts as mitigated would fall within the environmental thresholds identified by CEQA.

5. That the City Council hereby adopts the MND and MMRP for the Project as required by the CEQA Guidelines (14 Cal. Code of Regs. § 15074).

6. That the City Council hereby designates the Director of Community Development as the Custodian of Records for the Project, and the Planning Division at City Hall, 1500 Warburton Avenue, Santa Clara, California, is the location of the documents and other material that constitute the record of proceedings upon which this decision is based.

7. Effective date. This resolution shall become effective immediately.

Resolution/ 1957 Pruneridge Avenue Residential Project – MND and MMRP Page 4 of 4 Rev: 7/27/2023

I HEREBY CERTIFY THE FOREGOING TO BE A TRUE COPY OF A RESOLUTION PASSED

AND ADOPTED BY THE CITY OF SANTA CLARA, CALIFORNIA, AT A REGULAR MEETING THEREOF HELD ON THE 18TH DAY OF NOVEMBER 2025, BY THE FOLLOWING VOTE:

AYES: COUNCILORS:

NOES: COUNCILORS:

ABSENT: COUNCILORS:

ABSTAINED: COUNCILORS:

ATTEST: ______________________________

NORA PIMENTEL, MMC

ASSISTANT CITY CLERK

CITY OF SANTA CLARA
Attachments Incorporated by Reference:

1. None
Resolution/ 1957 Pruneridge Avenue Residential Project - Amendment to PD Page 1 of 4 Rev: 7/27/2023
RESOLUTION NO. __________

A RESOLUTION OF THE CITY OF SANTA CLARA,

CALIFORNIA TO APPROVE THE PLANNED DEVELOPMENT
(PD) ZONING AMENDMENT TO REPLACE THE APPROVED 22
ELECTRIC STOVETOPS WITH 22 NATURAL GAS

STOVETOPS FOR THE APPROVED RESIDENTIAL PROJECT
(PLN22-00505) LOCATED AT 1957 PRUNERIDGE AVENUE,

SANTA CLARA
PLN25-00073 (Rezone)
WHEREAS, On February 19, 2025, SCS Development (“Owner”) filed an application for the development of a 2.47-acre site located at 1957 Pruneridge Avenue, Santa Clara (“Project Site”);
WHEREAS, the Project Site has a General Plan designation of Very Low Density Residential and is zoned Planned Development (PD);
WHEREAS, On March 19, 2024, the City Council approved the Owner’s request to rezone the subject property from Public, Quasi-Public, and Public Park or Recreation (B) to Planned Development (PD) to construct the residential development with 22 detached two-story allelectric homes, private street and associated on- and-off-site improvements, and a Vesting Tentative Subdivision Map to subdivide the property into individual for-sale lots and four common lots for use as a utility corridor, vehicle access, landscape open space and bioretention areas (Approved PD);
WHEREAS, On March 19, 2024, City Council certified the Environmental Impact Report and adopted the CEQA Findings, Statement of Overriding Considerations, and the Mitigation Monitoring and Reporting Program for the 1957 Pruneridge Avenue Residential Project (Approved PD);
WHEREAS, on February 19, 2025, the Owner applied to amend the Approved PD to replace the approved electric stovetop appliances in each of the units with natural gas stovetop appliances (“Project”);
Resolution/ 1957 Pruneridge Avenue Residential Project - Amendment to PD Page 2 of 4 Rev: 7/27/2023
WHEREAS, in accordance with the Condition of Approval P23 of the Approved PD, installation of natural gas infrastructure requires an amendment to the Approved PD zoning, and review by the Planning Commission and approval by Council;
WHEREAS, to analyze the proposal to allow for the use of natural gas by replacing the approved electric stovetop appliances in the project with natural gas stovetop appliances, the City, as Lead Agency, in tandem with Consultant ‘David J. Powers’ prepared an Initial Study (“IS”) and a Mitigated Negative Declaration for the proposed project in accordance with the California Environmental Quality Act (“CEQA”), which was circulated for a 20-day review to public agencies which have jurisdiction by law with respect to the Project, as well as to other interested persons and agencies, and the City sought the comments of such persons and agencies beginning on July 18, 2025 and concluding on August 7, 2025 (“Comment Period”); and
WHEREAS, a Mitigation Monitoring and Reporting Program (“MMRP”) has been prepared for implementation with Project development to reduce potentially significant impacts identified in the Initial Study to less than significant; and
WHEREAS, the City through consultant ‘David J. Powers’ prepared written responses to the comments received during the Comment Period and included these responses on the project’s CEQA page; and
WHEREAS, on October 8, 2025, the Planning Commission held a duly noticed public hearing, at the conclusion of which, the Planning Commission recommended approval (6-0-0) of the Mitigated Negative Declaration, the Mitigation Monitoring and Reporting Program, and Amendment to the Approved Residential PD;
WHEREAS, on September 24, 2025, a notice of the public hearing on the proposed amendment to the PD was published in the Weekly, a newspaper of general circulation, for the City Council Hearing to be conducted on November 18, 2025; and
Resolution/ 1957 Pruneridge Avenue Residential Project - Amendment to PD Page 3 of 4 Rev: 7/27/2023
WHEREAS, on September 15, 2025, the notice of public hearing for the November 18, 2025, Cit Council Hearing for this item was mailed to property owners within a 1,000-foot radius of the Project Site boundaries; and
WHEREAS, pursuant to SCCC Section 18.146.020, on November 7, 2025, notices of the public hearing of November 18, 2025, were posted at City Hall, the Central Park Library, the Mission Branch Library, the Northside Branch Library, and on the City’s website; and WHEREAS, on November 18, 2025, the City Council held a duly noticed public hearing to consider the Project, the MND, the MMRP, and all pertinent information in the record during which the Council invited and considered any and all verbal and written testimony and evidence offered in favor of and in opposition to the Project.

NOW THEREFORE, BE IT RESOLVED BY CITY OF SANTA CLARA AS FOLLOWS:

1. That the City Council hereby finds that the above Recitals are true and correct and by this reference makes them a part hereof.

2. That the City Council hereby amends the Approved Planned Development (PD) to replace the approved electric stovetop appliances in the project with natural gas stovetop appliances.
//
//
//
//
//
Resolution/ 1957 Pruneridge Avenue Residential Project - Amendment to PD Page 4 of 4 Rev: 7/27/2023

3. Effective date. This resolution shall become effective immediately.

I HEREBY CERTIFY THE FOREGOING TO BE A TRUE COPY OF A RESOLUTION PASSED

AND ADOPTED BY THE CITY OF SANTA CLARA, CALIFORNIA, AT A REGULAR MEETING THEREOF HELD ON THE 18TH DAY OF NOVEMBER 2025, BY THE FOLLOWING VOTE:

AYES: COUNCILORS:

NOES: COUNCILORS:

ABSENT: COUNCILORS:

ABSTAINED: COUNCILORS:

ATTEST: ______________________________

NORA PIMENTEL, MMC

ASSISTANT CITY CLERK

CITY OF SANTA CLARA
Attachments Incorporated by Reference:

1. None

Page 1 of 17 ends

CONDITIONS OF APPROVAL
1957 Pruneridge Avenue -PLN25-00073 APNs: 230-05-021
Project Description: Amend the Approved Planned Development (PD) Zoning for 22 AllElectric Detached Single-Family Residences (PLN22-00505) to Allow for the Installation of Natural Gas Stove Appliances for the Property Located at 1957 Pruneridge Avenue.

GENERAL
G1. If relocation of an existing public facility becomes necessary due to a conflict with the developer's new improvements, then the cost of said relocation shall be borne by the developer.

G2. Comply with all applicable codes, regulations, ordinances and resolutions.

ATTORNEY’S OFFICE
A1. The Developer agrees to defend and indemnify and hold City, its officers, agents, employees, officials and representatives free and harmless from and against any and all claims, losses, damages, attorneys' fees, injuries, costs, and liabilities arising from any suit for damages or for equitable or injunctive relief which is filed by a third party against the City by reason of its approval of developer's project.

COMMUNITY DEVELOPMENT

BUILDING DIVISION
B1. Prior to overall construction permit application, submit to the Santa Clara Building Division, 2 copies of an addressing diagram request, to be prepared by a licensed architect or engineer. The addressing diagram(s) shall include all proposed streets and all building floor plans. The addressing diagram(s) shall conform to Santa Clara City Manager Directive #5; Street Name and Building Number Changes, and Santa Clara Building Division Address Policy For Residential and Commercial Developments. The addressing diagram(s) shall indicate all unit numbers to be based off established streets, not alleys nor access-ways to garages. Allow a minimum of 10 working days for initial staff review. Please note city staff policy that existing site addresses typically are retired.

Provide digital pdf printed from design software, not scanned from printed paper sheet. a. Any building or structure that is demolished shall have its address retired and a new address/s shall be issued for the project.

B2. The construction permit application drawings submitted to the Santa Clara Building Division shall include a copy of the latest Federal Emergency Management Agency (FEMA) Flood Zone Map: https://msc.fema.gov/portal/home. The project drawings shall indicate how the project complies with the Santa Clara Flood Damage Prevention Code. a. FEMA Flood Zone map designations and requirements are based on the map in effect at date of Building Permit issuance.

B3. The construction permit application drawings submitted to the Santa Clara Building Division shall include Santa Clara Valley Urban Runoff Pollution Prevention Program Low Impact Development (LID) practices http://www.scvurppp-w2k.com/nd_wp.shtml .

All projects that disturb more than one acre, or projects that are part of a larger development that in total disturbs more than one acre, shall comply with the Santa Clara Valley Urban Runoff Pollution Prevention Program Best Management Practices (BMP):

City of
Santa Clara
The Center of What's Possible

Page 2 of 17 ends

http://www.scvurppp-w2k.com/construction_bmp.shtml, and shall provide a Storm Water Pollution Prevention Plan (SWPPP) by a certified Qualified SWPPP Developer (QSD).

All site drainage and grading permit applications submitted to the Santa Clara Building Division shall include a city of Santa Clara "C3" data form, available on this web page  https://www.santaclaraca.gov/our-city/departments-g-z/publicworks/environmental-programs/stormwater-pollution-prevention and will be routed to a contract consultant for review.

B4. No construction code review or analysis is being done at this time. The construction permit application drawings submitted to the Santa Clara Building Division shall include an overall California Building Code analysis, including; proposed use and occupancy of all spaces ( CBC Ch. 3), all building heights and areas (CBC Ch. 5), all proposed types of construction (CBC Ch. 6), all proposed fire and smoke protection features, including all types of all fire rated penetrations proposed (CBC Ch. 7), all proposed interior finishes fire resistance (CBC Ch. 8), all fire protection systems proposed (CBC Ch. 9), and all means of egress proposed (CBC Ch. 10). Noncombustible exterior wall, floor, and roof finishes are strongly encouraged.
 During construction retaining a single company to install all fire rated penetrations is highly recommended.
 The grade level lobbies shall be minimum1 hour rated all sides and above.  All stair shafts shall be minimum 1 hour rated.
 All elevator shafts shall be minimum 1 hour rated.
 All trash chute shafts shall be minimuum 1 hour rated.  Recommendation: provide a minimum of two trash chutes; one for recyclables, one for trash, each trash chute to be routed down to a grade level trash collection room.
 Any trash rooms shall be minimum 1 hour rated all sides and above.

B5. The overall project construction permit application shall include the geotechnical, architectural, structural, energy, electrical, mechanical, and plumbing drawings and calculations. Prior to the issuance of the overall project construction permit, a conditions of approval review meeting must be held in city hall, which meeting must be attended by the on-site field superintendent(s). The meeting will not be held without the attendance of the on-site field superintendent(s). The on-site grading permit shall be a separate permit application to the Building Division.

B6. Temporary Certificates of Occupancy (TCO) will not be routinely issued and will be considered on a very limited basis only when there is a clear and compelling reason for city staff to consider a TCO. A TCO will be approved only after all applicable City staff have approved in writing; Planning, Public Works / Engineering, Fire Prevention, Santa Clara Water, Silicon Valley Power, and any other applicable agencies such as the Santa Clara County Health Dept., with the Building Division being the final approval of all TCO.'s.

B7. See Title 15 of the Santa Clara City Code for any amendments to the California Building Codes.

B8. This project is subject to the provisions of the City of Santa Clara 2022 Reach Code, as set forth in City Code Chapters 15.36 and 15.38, with the exception of the “all-electric” requirements suspended by the City Council on January 14, 2025. effective January 2022 See Ordinance No. 2034 and/or Title 15 of the Santa Clara City Code.  Chp. 15.36 – Energy Code for “all electric” provisions for new construction.  Chp. 15.38 – Green Building Code for additional Electric Vehicle Charging requirements for new construction.

HOUSING & COMMUNITY SERVICES DIVISION

Page 3 of 17 ends

H1. In accordance with the Santa Clara City Code chapter 17.40, this project is subject to the affordable housing requirements and impact fee for the proposed 22 units for-sale residential development. The Applicant shall provide not less than fifteen percent (15%) of the units (or 3.3 units) to affordable households made available at affordable sales prices to extremely low, very low, low and/or moderate-income households as long as the distribution of affordable units averages to a maximum of one-hundred (100) percent of Area Median Income. All prices are set in accordance with the City’s Below Market Purchase (BMP) Program Policies and Procedures Manual (subject to updates and changes). Applicant shall be responsible for cost incurred under the Building Energy Efficiency Standards – Title 24 for the each affordable for- sale residential unit.

Additionally, where the calculation of affordable housing requirements results in a fractional unit, the Applicant shall either pay an In-Lieu Fee or the Applicant shall provide an additional unit to satisfy the requirement. Any in-lieu fee payment due to the City by the Applicant shall be payable prior to the issuance of the certificate of occupancy. The in-lieu fee amount shall be equal to the difference between the unrestricted appraised market value ("Initial Market Value") and the Affordable Sales Price of one of the BMP units at completion, multiplied by the fractional unit. The Initial Market Value of the last BMP unit sold shall be the basis for calculating the in-lieu fee to be paid by Applicant.

H2. Prior to issuance of Building Permits, the Developer shall enter into an Affordable Housing Agreement (AHA) with the City that will determine the Affordable Sales Price for the Affordable Units at Lot 14, 15 and 22, and apply all terms and covenants guaranteeing the prescribed affordability. Satisfaction of the affordable housing obligation shall be memorialized in the AHA and subject to City Council approval. There will be a fee for the preparation of the AHA in the amount of $4,020 which will be due prior to execution of the AHA. Please note all fees are based on the current Municipal Fee Schedule in effect at the time the project is approved

PLANNING DIVISION
P1. Submit plans for final architectural review to the Planning Division for Architectural Committee review and approval prior to issuance of building permits. Said plans to include, but not be limited to: site plans, floor plans, elevations, landscaping, irrigation plan, signage, and stormwater management plan.

P2. The Developer must provide third party verification of the stormwater management plan for conformance with C3 requirements as part of the architectural submittal.

P3. Submit complete landscape plans, including irrigation plan and composite utility and tree layout overlay plan, for Planning Department review and approval with installation of required landscaping prior to the issuance of occupancy and or final building permits.

Landscape plan to include type and size of proposed trees. Type and size of tree replacement on project site shall be at the direction of the City Arborist and require Planning review and approval. Coordinate with the Street Department and City Arborist for the type, location, installation and maintenance of street trees fronting the project site along the public right-of-way. Installation of root barriers and super-soil may be required with the installation of trees where electric, water, and sewer utilities are in proximity.

P4. The overlay plan is to show the location of all utilities, storm drains, catch basins, sewer mains, joint trenches, building footprints, driveways, walkways, and trees. Trees are required to be 10 feet from public water, storm and sewer facilities unless a City approved Tree Root Barrier (TRB) is used. If a City approved TRB is used the TRB must be a minimum of five feet from the public water, storm and sewer facility with the tree behind the TRB and specified on the plan. Landscaping installation shall meet City water conservation criteria in a manner acceptable to the Director of Planning and Inspection.

Page 4 of 17 ends

P5. Developer shall construct a complete street section along the project frontage of Pruneridge Avenue to include a 5-foot landscape strip with 4.5-feet of clear planting width and a 5-foot sidewalk behind the landscape strip. The landscape strip is to include trees (minimum 24-inch box) and drought tolerant plantings.

P6. Submit as-built on-site plans prepared by a registered civil engineer showing all utilities serving the subject property.

P7. Obtain required permits and inspections from the Building Official and comply with the conditions thereof. As this project involves land area of one acre or more, the Developer shall file a Notice of Intent (NOI) with the State Water Resources Control Board prior to issuance of any building permit for grading, or construction; a copy of the NOI shall be sent to the City Building Inspection Division. A stormwater pollution prevention plan is also required with the NOI.

P8. The Developer shall submit a truck hauling route for demolition, soil, debris and material removal, and construction to the Director of Community Development for review and approval prior to the issuance of demolition and building permits.

P9. Minor changes to individual homes, landscaping, or other minor plan elements would be subject to Planning Division review and approval of a Minor Adjustment to an approved project, or through Architectural Review, subject to the discretion of the Director of Community Development.

P10. Project site landscaping shall be maintained in good condition throughout the life of the Project and no trees shall be removed without City review and approval. Trees permitted by the City for removal shall be replaced at a 2:1 ratio with 24-inch box specimen tree, or equal alternative as approved by the Director of Community Development.

P11. Developer shall submit to the City Covenants, Conditions and Restrictions (CC&R’s) or equivalent instrument assigning and governing perpetual maintenance of the common lots, private street/vehicle access driveway, on-site and street frontage landscaping in good condition for the life of the Project, prior to issuance of building permits. Said document shall be recorded along with the Title for each property with the Santa Clara County Recorder’s Office.

P12. The Covenant, Conditions and Restrictions for this project shall include language that precludes exclusive storage use of the garage and obstruction of parking spaces in the garage by storage, shall and requires property owners to maintain garages for parking purposes.

P13. Garages shall be accessible for parking and labeled as such on the building permit plans.

P14. Overhead garage storage shall be offered as a design option in each of the units.

P15. Provide automatic garage door openers and roll-up garage doors.

P16. Each garage shall be equipped with electrical vehicle charging stations.

P17. HVAC units shall be screened from view along the public right-of-way.

P18. Individual garbage and recycling containers shall be kept out of sight from the public right-of-way and private driveway until collection day.

P19. Applicant shall comply with all the construction and on-going mitigation measures described in the adopted Mitigation Monitoring and Reporting Program (MMRP) to the satisfaction of the Director of Community Development. The Mitigation and Monitoring and Reporting Program shall be included in all construction plan sets.

P20. All exposed surfaces (e.g., parking areas, staging areas, soil piles, graded areas, and unpaved roads) shall be watered two times per day, except on days when rain occurs.

P21. All visible mud or dirt track-out onto the adjacent public right-of-way shall be removed using wet power vacuum street sweeper at least once per day. The use of dry power sweeping shall be prohibited.

Page 5 of 17 ends

P22. Additional dust and noise abatement measures may be on the project site at the discretion of the Community Development Director to provide additional sound attenuation and fugitive dust abatement as described in the project Mitigation Monitoring and Reporting Program. This may include additional noise monitoring and installation of a temporary noise control blanket barrier, if necessary, along building facades facing construction sites if conflicts occurred which are irresolvable by proper scheduling.

P23. In order to be consistent with the greenhouse gas analysis in the project CEQA documents, no natural gas infrastructure shall be installed on the project site. If the developer seeks to install natural gas infrastructure in the future, the developer must first seek an amendment to the PD zoning.

P24. Developer shall use reasonable efforts, to the satisfaction of the Director of Community Development, to obtain documentation from the Diocese of the previous church on the site, Saint Mark’s, regarding the disposition of the human remains and details as to their new location.

P25. Provide “Right Turn Only During Peak Hours” signage for the project driveway.

P26. Developer to create a memorial to the church (using the Architect William Mays’ name) utilizing materials from the church in the memorial if the church is not relocated.

Developer is to return to the Historical and Landmarks Commission to present the memorial design.

FIRE
F1. Prior to Building Permit Issuance, a Phase II environmental assessment is required to be submitted to CRRD for review. If hazards are present that require site mitigation, cleanup, or management of chemical contaminants in soil, soil vapor, or groundwater a separate permit from one of the regulatory agencies below will be required. The type and extent of contamination on site(s) will govern which of the regulatory agencies noted below can supervise the cleanup:
 Department of Toxic Substances Control (DTSC);
 State Water Resources Control Board; or
 Santa Clara County, Department of Environmental Health.

If the project intends to contract with a State or County Agency for onsite/offsite environmental remediation activities the following documentation shall be provided to the Fire Prevention & Hazardous Materials Division prior to issuance of a Building Permit for demolition or grading: Oversight agency case number; and Oversight mangers contact name, phone number.

F2. Prior to Building Permit Issuance, a permit for Construction Safety & Demolition shall be submitted to the fire department for review and approval in compliance with our Construction Safety & Demolition standard.

F3. Prior to Building Permit Issuance, provide documentation from the City of Santa Clara Water & Sewer Department that the minimum required fire-flow can be met. Fire Department fire-flow will be based on the current California Fire Code. The most restrictive departments requirement shall apply.

F4. Prior to Building Permit Issuance, building plans shall show the required number, location and distribution of fire hydrants for the buildings will be based on the current California Fire Code, Appendix C as amended. The required number of fire hydrants will be based on the fire-flow before the reduction for fire sprinklers. Both public and private fire hydrants may be required.

F5. Prior to Building Permit Issuance, any EVAE’s or fire protection equipment (including but not limited to fire service undergrounds, sprinkler piping, fire alarm equipment, fire pumps, ERRCS) that cross property lines or is not located on the parcel of the building it

Page 6 of 17 ends

serves shall have a CC&R legally recorded detailing who is responsible for maintenance and repair of the EVAE or fire protection equipment
F6. Prior to any Building Permit issuance, an alternate means or methods permits to mitigate any code deficiency must be submitted and approved. Please submit this permit concurrently with the building plans. Please note specific mitigations may have been discussed during the PCC process. None of these discussions are binding and can only be formally approved through submitting an Alternate Means and Measures (AMM) permit. The AMM permit is formally documenting that and still needs to be submitted.

F7. Please be aware that emergency rescue openings are required for this project per California Residential Code R310 and locations should be on the front or back side of the house (not the side of the house).

PARKS & RECREATION
PR1. This memo assumes the Project is a subdivision and the Quimby Act provisions will apply. The project will generate an estimated 66 residents (2.98 persons/household x 22 units). Based on the Quimby Act standard of 3.0 acres/1000 residents, the amount of public parkland required for this Project to mitigate the impact of the new resident demand is approximately 0.1967-acres. The equivalent fee due in lieu of parkland dedication is therefore $1,378,608.

PR2. Final calculations will depend upon the actual number and type of units and the mix of parkland dedicated and remaining fee due, at the discretion of the City.

PR3. Calculations may change if the number of units change, if any areas do not conform to the Ordinance and City Code Chapter 17.35, and/or if the fee schedule for new residential development fees due in lieu of parkland dedication changes before a project is deemed complete by Planning.

PR4. Dwelling Unit Tax: a dwelling unit tax (DUT) in the amount of $700 is also due based on the number of units and additional bedrooms per City Code Chapter 3.15.

POLICE
PD1. The property should be fenced off during demolition and construction as a safety barrier to the public and deterrent to theft and other crime. Consider not having any screening material on the fence so passing Police Patrol checks will be able to see into the site.

PD2. Address numbers should be a minimum of twelve (12) inches in height for commercial or industrial buildings. Consider illuminated numbers during the hours of darkness, and in a color that is contrasting to the background material. They shall be clearly visible from the street. Where multiple units or buildings occupy the same property, each unit/building address shall be clearly visible. A monument sign, preferably at all entrances to the property, should be prominently displayed showing all unit/building numbers, addresses, etc. A map is recommended for large complexes with multiple streets or walkways.

PD3. If the project includes any benches, these benches should not be longer than 5 feet in length and should have arm rests at both ends. If the benches are longer than 5 feet in length, there should be a divider (arm rest or similar) in the middle of the bench in addition to the arm rests on both ends. This helps prevent unlawful lodging and/or skateboarding. Another option to benches could be cubes, knee walls, or other creative types of seating possibilities.

PUBLIC WORKS

ENGINEERING
E1. Obtain site clearance through Public Works Department prior to issuance of Building Permit. Site clearance will require payment of applicable development fees. Other requirements may be identified for compliance during the site clearance process.

Contact Public Works Department at (408) 615-3000 for further information.

Page 7 of 17 ends

E2. All work within the public right-of-way and/or public easement, which is to be performed by the Developer/Owner, the general contractor, and all subcontractors shall be submitted within a Single Encroachment Permit to be reviewed and issued by the City Public Works Department. Issuance of the Encroachment Permit and payment of all appropriate fees shall be completed prior to commencement of work, and all work under the permit shall be completed prior to issuance of occupancy permit.

E3. Submit public improvement/encroachment permit plans prepared in accordance with City Public Works Department procedures which provide for the installation of public improvements directly to the Public Works Department. Plans shall be prepared by a Registered Civil Engineer and approved by the City Engineer prior to approval and recordation of final map and/or issuance of building permits.

E4. All work within City of San Jose right-of-way shall require a City of San Jose encroachment permit.

E5. Existing non-standard or non-ADA compliant frontage improvements shall be replaced with current City standard frontage improvements as directed by the City Engineer or his designee.

E6. Damaged curb, gutter, and sidewalk within the public right-of-way along property’s frontage shall be repaired or replaced (to the nearest score mark) in a manner acceptable to the City Engineer or his designee. The extents of said repair or replacement within the property frontage shall be at the discretion of the City Engineer or his designee.

E7. Developer shall provide a complete storm drain study for the 10-year and 100-year storm events. The grading plans shall include the overland release for the 100-year storm event and any localized flooding areas. System improvements, if needed, will be at developer’s expense.

E8. All storm drain mains and laterals, sanitary sewer mains and laterals shall be outside the drip line of mature trees or 10’ clear of the tree trunk whichever is greater.

E9. Provide root barriers when the drip line of the mature trees covers the sidewalk. Root barriers for sidewalk protection shall be 16' long or extend to drip line of the mature tree, whichever is greater, and be 1.5' deep, and centered on trees. Root barriers for curb and gutter protection shall be 16' long or extend to drip line of the mature tree, whichever is greater, and be 2’ deep, and centered on trees.

E10. Existing streetlights shall be clear of proposed sidewalk, developer shall relocate as necessary.

E11. If requested, Developer/property owner shall prepare and submit for City approval a maintenance plan for all sidewalk, curb and gutter, landscaping and irrigation system improvements installed within the public right-of-way prior to encroachment permit issuance. Such plan shall include at a minimum, maintenance requirements for trees and shrubs, in acknowledgement of developer’s/property owner’s obligation under Chapter 12.30 and 17.15.

E12. Dedicate required on-site easements for any new public utilities, and/or emergency vehicle access by means of subdivision map or approved instrument at time of development.

E13. Dedicate sidewalk easements along the project frontage where public sidewalks extend into private property. Sidewalk easements are to be 1’ behind proposed back of walk where there is landscaping behind sidewalk. Sidewalk easement where hardscape is behind sidewalk is to be at back-of-walk. Cold joint is required between public sidewalk and private hardscape.

E14. Onsite pathways shall be dedicated as private easements, as needed.

E15. After City Council approval of the Tentative Map, submit the Subdivision Map, prepared by a Licensed Land Surveyor or a Registered Civil Engineer with Land Surveyor

Page 8 of 17 ends

privileges to the Engineering Department. The submittal shall include a title report, closure calculations, and all appropriate fees.

E16. Pavement treatment shall be 2” grind and overlay with dig-outs for the full street width of Pruneridge Avenue.

E17. Traffic improvements must comply with the City of Santa Clara Standard Specifications for Public Works Construction
E18. Residential bicycle parking shall be a minimum of 8 Class I spaces (one per 3 dwelling units) and 2 Class II spaces (one per 15 dwelling units) per 2007 VTA Bicycle Technical Guidelines.

E19. Class I and Class II bicycle parking, as defined in SCMC 18.74.075, shall be conveniently accessible from the street, within 200 feet of a building entrance and/or highly visible areas.

E20. Submit Vehicle Miles Travel and vehicle trip calculations in accordance with the City transportation policy:
https://www.santaclaraca.gov/our-city/departments-g-z/public-works/engineering/trafficengineering/transportation-analysis-policy-update E21. Conduct a trip generation analysis for the project. A local transportation analysis (LTA) will be required if the project generates over 100 net new trips.

E22. Landscape improvements within 10 feet of a driveway must be less than 3 feet or greater than 10 feet per City Standard Detail TR-9.

E23. All on-site structures (including fences) must be clear of Driveway Visibility Clearance Areas per City Standard Detail TR-9.

E24. Replace unused/abandoned driveways with new curb, gutter, and sidewalk.

E25. Design and construct driveway in accordance with City Standard Detail ST-8.

STREETS DIVISION
Landscape
L1. Include City of Santa Clara Tree Preservation/City Arborist specifications on all improvement plans.

L2. No cutting of any part of public trees, including roots, shall be done without securing prior approval of the City Arborist. Tree trimming/removal shall be done in accordance to the City of Santa Clara Tree Preservation/City Arborist specifications and with direct supervision of a certified arborist (Certification of International Society of Arboriculture).

L3. Identified existing mature trees to be maintained. Prepare a tree protection plans for review and approval by the City of Santa Clara prior to any demolition, grading or other earthwork in the vicinity of existing trees on the site.

Solid Waste
SW1. The applicant shall complete and provide the Post-Construction Solid Waste Generation Estimation and Collection Form, which includes the estimation of trash and recycling materials generated from the project. Use the City’s Solid Waste Guidelines for New and Redevelopment Projects as specified by the development type. Contact the Public Works Department at [email protected] or (408) 615-3080 for more information. All collection is to occur on private property using individual toters.

SW2. The applicant shall provide a site plan showing all proposed locations of solid waste containers, chutes, compactors, trash enclosures and trash staging areas. The site plan shall show the route or access for trash and recycling collectors (trucks) including vertical clearance, turning radius and street/alley widths. All plans shall comply with the City’s Solid Waste Guidelines.

SW3. For projects that involve construction, demolition or renovation of 5,000 square feet or more, the applicant shall comply with City Code Section 8.25.285 and recycle or divert at

Page 9 of 17 ends

least sixty five percent (65%) of materials generated for discard by the project during demolition and construction activities. No building, demolition, or site development permit shall be issued unless and until applicant has submitted a construction and demolition debris materials check-off list. Applicant shall create a Waste Management Plan and submit, for approval, a Construction and Demolition Debris Recycling Report through the City’s online tracking tool at http://santaclara.wastetracking.com/ .

SW4. Prior to obtaining a Temporary or Final Certificate of Occupancy, individual weight tickets for all materials generated for discard or reuse by the project during demolition and construction activities shall be uploaded to Green Halo and submitted for review and approval by Environmental Services. At a minimum two (2) weeks review time is required.

SW5. This project is subject to the City’s Accumulation, Transportation and Disposal of Solid Waste Ordinance (Chapter 8.25 of the Municipal Codes), which requires the handling and disposal of waste by authorized service haulers. Insert the General Notes for the Construction & Demolition (C&D) Waste Management into construction plans in accordance with the City’s municipal codes prior to the issuance of a Building or Grading permit. Provide the Green Halo waste online tracking number to Building staff prior to the issuance of a demolition or building permit.

SW6. Project applicant shall contact the Public Works Department, Street Maintenance Division at (408) 615-3080 to verify if the property falls within the City’s exclusive franchise hauling area. If so, the applicant is required to use the City’s exclusive franchise hauler and rate structure for any hired debris boxes. Prior to the issuance of a Public Works clearance, the project applicant shall complete and sign the Construction and Demolition (C&D) / Waste Management Rules and Regulations Form.

SW7. All refuse from all residential, commercial, industrial and institutional properties within the city shall be collected at least once a week, unless otherwise approved in writing (SCCC

8.25.120). Garbage service level required for residential developments (single-family and multi-family) as well as motels and hotels shall be no less than twenty (20) gallons per unit. All project shall submit to the Public Works Department the preliminary refuse service level assessment for approval.

Stormwater
ST1. Prior to City’s issuance of Building or Grading Permits, the applicant shall develop a Final Stormwater Management Plan, update the C.3 Data Form, the Special Project Narratives and Worksheet (as appropriate), and an Erosion and Sediment Control Plan.

ST2. The Final Stormwater Management Plan and all associated calculations shall be reviewed and certified by a qualified 3rd party consultant from the SCVURPPP List of Qualified Consultants, and a 3rd party review letter shall be submitted with the Plan.

ST3. For project that disturbs a land area of one acre or more, the applicant shall provide a copy of the Notice of Intent (NOI) with WDID number for coverage under the State Construction General Permit. Active projects with NOI will be inspected by the City once per month during the wet season (October – April).

ST4. The applicant shall incorporate Best Management Practices (BMPs) into construction plans and incorporate post-construction water runoff measures into project plans. Include the SCVURPPP Countywide Construction BMPs Plan Sheet with the plans.

ST5. Include the C.3 Treatment Facilities Construction Notes on the Improvement Plans and/or Stormwater Control Plans.

ST6. During the construction phase, all stormwater control measures shall be inspected for conformance to approved plans by a qualified 3rd party consultant from the SCVURPPP List of Qualified Consultants, and a 3rd party concurrence letter on the C.3 facilities construction shall be submitted to the Public Works Department. The City reserves the

Page 10 of 17 ends

right to review the 3rd party inspection reports on the C.3 stormwater facilities installation.

ST7. Applicant shall install biotreatment soil media that meets the minimum specifications as set forth in the SCVURPPP C.3 Stormwater Handbook. If percolation rate test of the biotreatment soil mix is not performed on-site, a certification letter from the supplier verifying that the soil meets the specified mix (the date of such document shall not be older than 3 months).

ST8. As-Built drawing shall be submitted to the Public Works Department. Include C.3 Stormwater Treatment Facilities Construction general notes on the improvement plans.

ST9. Permeable Pavement, Media Filter vaults, Interceptor Trees and Trash Full Capture Devices shall be inspected by a third-party reviewer and/or manufacturer representative for conformance with the details and specifications. If necessary, percolation test shall be performed to ensure proper installation. A map displaying the number, location and details of full trash capture devices shall be prepared as an attachment to the Operations and Maintenance (O&M) Agreement with the City.

ST10. Stormwater treatment facilities must be designed, installed, and maintained to achieve the site design measures throughout their life in accordance to the SCVRUPPP C.3 Stormwater Handbook (Chapter 6 and Appendix C).

ST11. The property owner shall enter into an Operation and Maintenance (O&M) Agreement with the City for all installed stormwater treatment measures and full trash capture devices in perpetuity. Applicants should contact Public Works Department. - Environmental Services at (408) 615-3080 or [email protected] for assistance completing the Agreement. For more information and to download the most recent version of the O&M Agreement, visit the City’s stormwater resources website at http://santaclaraca.gov/stormwater. Inspection of permeable pavement, media filter vaults and full trash capture devices is to be done annually by December 31 of each year.

ST12. Any site design measures used to reduce the size of stormwater treatment measures shall not be installed for the project without the written approval from the City, installing the corresponding resizing of other stormwater treatment measures and an amendment of the property’s O&M Agreement.

ST13. For single-family homes and other small projects that create and/or replace 2,500 – 10,000 square feet of impervious surface area, the applicant shall implement at least one of the following site design measures:
a. Direction of roof runoff into cisterns or rain barrels b. Direction of roof, sidewalk, walkway, patio, driveway, or parking lot runoff onto vegetated areas
c. Construction of sidewalks, walkways, patios, bike lanes, driveways, and parking lots with permeable surfaces
Plans shall specify which site design measures are selected for the project and show the direction of flow from impervious surfaces to the selected site design measures. All measures shall meet the design criteria in the 2016 C.3. Stormwater Handbook, Appendix K: Standard Specifications for Lot-Scale Measures for Small Projects.

ST14. Developer shall install an appropriate stormwater pollution prevention message such as “No Dumping – Flows to Bay” on any storm drains located on private property.

ST15. Interior floor drains shall be plumbed to the sanitary sewer system and not connected to the City’s storm drain system.

ST16. Floor drains within trash enclosures shall be plumbed to the sanitary sewer system and not connected to the City’s storm drain system.

ST17. All outdoor equipment and materials storage areas shall be covered and/or bermed, or otherwise designed to limit the potential for runoff to contact pollutants.

Page 11 of 17 ends

ST18. Decorative and recreational water features such as fountains, pools, and ponds shall be designed and constructed to drain to the sanitary sewer system only.

ST19. The use of architectural copper is discouraged. If such material is used, all wastewater generated by the installation, cleaning, treating, or washing of the surface of copper architectural features, including copper roofs, shall not be discharged to the City’s storm drain system.

SILICON VALLEY POWER
EL1. Drive Aisle A should be a 10’ U.G.E.E if its only for electric and public tv and cable companies. Install a joint trench with public tv and cable conduits 1’ away from the SVP conduits. This clearance only applies if all conduits are installed at the same time.

Reference UG1000 standard for joint trench configuration. Phone and cable conduits should be placed on the side closer to the trees.

EL2. Any streetlight foundations that conflict with the new location of the SVP trench along Pruneridge Ave, will need to be relocated further back from the front of curb.

EL3. All streetlighting, low voltage, and fiber systems are to be designed during detailed design.

EL4. All tie-in points shown on the utility plan along with electrical substructure will be needed prior to the removal of the overhead power lines.

EL5. All electrical laterals serving parcels on the south side of Drive Aisle A may need easements if it’s a private roadway. All easements for SVP should be a U.G.E.E (underground electric easement).

EL6. Clearances: (Make sure job notes do not conflict with SVP clearance requirements) a. EQUIPMENT
i.Ten (10) foot minimum clearance is required in front of equipment access doors. (UG1000 sheet 11)
ii.Five (5) foot minimum clearance from pad is required on sides without equipment access doors. (UG1000 sheet 11)
iii.Eighteen (18) foot minimum width, shall be provided and maintained on one side of the equipment pad to allow an electric dept. line truck to drive up next to the pad for installation and maintenance of equipment. (UG1000 Sheet 11).
iv.Barrier pipes are required only on sides accessible to vehicles. (UG1000 Sheet 12).

1. Thirty (30) inches from side of equipment sides.

2. Forty Eight (48) inches in front of access doors.
a. Barrier Pipes in front of access doors shall be removable. b. CONDUITS
i.Five (5) foot minimum longitudinal clearance between new conduits or piping systems (open trench installation) and any existing or proposed SVP conduit system. This is for longitudinal. (UG1250 sheet 5) ii.Twelve (12) inch minimum vertical clearance between new conduit/pipes installed perpendicular to existing SVP conduits for open trench installations. (UG1000 sheet 36, UG1250 Sheet 6)
iii.Three (3) foot six (6) inches clearance is required from poles for open trench installation. Exceptions are for riser conduit. (UG1250 Sheet 7) iv.Three (3) foot minimum clearance is required between sign-posts, barrier pipes or bollards, fence posts, and other similar structures. (UG1250 sheet 10).
v.Five (5) foot minimum from new splice boxes, pull boxes, manholes, vaults, or similar subsurface facilities. (UG1000 sheet 8)

Page 12 of 17 ends

vi.Five (5) foot minimum clearance from walls, footings, retaining wall, landscape planter, tree root barrier or other subsurface wall or structure. (UG1250 sheet 9).
vii.Five (5) foot minimum clearance is required between fire hydrant thrust block. The thrust block extends 5’ foot on either side of the fire hydrant in line with the radial water pipe connected to the hydrant. c. VAULTS/MANHOLES
i.Ten (10) foot minimum clearance is required between adjacent Vaults or Manholes.
ii.Five (5) foot minimum clearance is required between adjacent conduits. iii.Minimum 36” from face of curb, or bollards required. d. Poles (Electrolier, Guy Stub poles, service clearance poles, self-supporting steel poles and lighting poles.)
i.Three (3) foot six (6) inches clearance is required from poles for open trench installation. Exceptions are for riser conduit. (UG1250 Sheet 7) e. Guy Anchors
i.Five (5) foot minimum clearance is required between center of anchor line and any excavation area. (UG1250 sheet 15).
f. Trees
i.OH 1230 for Overhead Lines
ii.SD 1235 for Tree Planting Requirements near UG Electric Facilities EL7. Reference listed SVP standards for clearances.
a. Installation of Underground Substructures by Developers b. UG1250 – Encroachment Permit Clearances from Electric Facilities c. UG0339 – Remote Switch Pad
d. OH1230 – Tree Clearances From Overhead Electric Lines e. SD1235 – Tree Planting Requirements Near Underground Electric Facilities EL8. Prior to submitting any project for Electric Department review, applicant shall provide a site plan showing all existing utilities, structures, easements and trees. Applicant shall also include a “Load Survey” form showing all current and proposed electric loads. A new customer with a load of 500KVA or greater or 100 residential units will have to fill out a “Service Investigation Form” and submit this form to the Electric Planning Department for review by the Electric Planning Engineer. SVP will do exact design of required substructures after plans are submitted for building permits.

EL9. The Developer shall provide and install electric facilities per Santa Clara City Code chapter 17.15.210.

EL10. Electric service shall be underground. See Electric Department Rules and Regulations for available services.

EL11. Installation of underground facilities shall be in accordance with City of Santa Clara Electric Department standard UG-1000, latest version, and Santa Clara City Code chapter 17.15.050.

EL12. Underground service entrance conduits and conductors shall be “privately” owned, maintained, and installed per City Building Inspection Division Codes. Electric meters and main disconnects shall be installed per SVP Standard MS-G7, Rev. 2.

EL13. The developer shall grant to the City, without cost, all easements and/or right of way necessary for serving the property of the developer and for the installation of utilities (Santa Clara City Code chapter 17.15.110).

EL14. If the “legal description” (not “marketing description”) of the units is condominium or apartment, then all electric meters and services disconnects shall be grouped at one location, outside of the building or in a utility room accessible directly from the outside. If they are townhomes or single-family residences, then each unit shall have its own meter,

Page 13 of 17 ends

located on the structure. A double hasp locking arrangement shall be provided on the main switchboard door(s). Utility room door(s) shall have a double hasp locking arrangement or a lock box shall be provided. Utility room door(s) shall not be alarmed.

EL15. If transformer pads are required, City Electric Department requires an area of 17’ x 16’- 2”, which is clear of all utilities, trees, walls, etc. This area includes a 5’-0” area away from the actual transformer pad. This area in front of the transformer may be reduced from an 8’-0” apron to a 3’-0”, providing the apron is back of a 5’-0” min. wide sidewalk. Transformer pad must be a minimum of 10’-0 from all doors and windows, and shall be located next to a level, drivable area that will support a large crane or truck.

EL16. All trees, existing and proposed, shall be a minimum of five (5) feet from any existing or proposed Electric Department facilities. Existing trees in conflict will have to be removed. Trees shall not be planted in PUE’s or electric easements.

EL17. Any relocation of existing electric facilities shall be at Developer’s expense.

EL18. Electric Load Increase fees may be applicable.

EL19. The developer shall provide the City, in accordance with current City standards and specifications, all trenching, backfill, resurfacing, landscaping, conduit, junction boxes, vaults, street light foundations, equipment pads and subsurface housings required for power distribution, street lighting, and signal communication systems, as required by the City in the development of frontage and on-site property. Upon completion of improvements satisfactory to the City, the City shall accept the work. Developer shall further install at his cost the service facilities, consisting of service wires, cables, conductors, and associated equipment necessary to connect a customer to the electrical supply system of and by the City. After completion of the facilities installed by developer, the City shall furnish and install all cable, switches, street lighting poles, luminaries, transformers, meters, and other equipment that it deems necessary for the betterment of the system (Santa Clara City Code chapter 17.15.210 (2)).

EL20. Electrical improvements (including underground electrical conduits along frontage of properties) may be required if any single non-residential private improvement valued at $200,000 or more or any series of non-residential private improvements made within a three-year period valued at $200,000 or more (Santa Clara City Code Title 17 Appendix A (Table III)).

EL21. Non-Utility Generator equipment shall not operate in parallel with the electric utility, unless approved and reviewed by the Electric Engineering Division. All switching operations shall be “Open-Transition-Mode”, unless specifically authorized by SVP Electric Engineering Division. A Generating Facility Interconnection Application must be submitted with building permit plans. Review process may take several months depending on size and type of generator. No interconnection of a generation facility with SVP is allowed without written authorization from SVP Electric Engineering Division.

EL22. Encroachment permits will not be signed off by SVP until Developers Work substructure construction drawing has been completed.

EL23. All SVP-owned equipment is to be covered by an Underground Electric Easement (U.G.E.E.) This is different than a PUE. Only publicly-owned dry utilities can be in a UGEE. Other facilities can be in a joint trench configuration with SVP, separated by a 1’ clearance, providing that they are constructed simultaneously with SVP facilities. See UG 1000 for details.

EL24. Proper clearance must be maintained from all SVP facilities, including a 5’ clearance from the outer wall of all conduits. This is in addition to any UGEE specified for the facilities. Contact SVP before making assumptions on any clearances for electric facilities.

EL25. Transformers and Switch devices can only be located outdoors. These devices MAY be placed 5’ from an outside building wall, provided that the building wall in that area meets

Page 14 of 17 ends

specific requirements. (See UG 1000 document for specifics) EXAMPLE: If there are any doors, windows, vents, overhangs or other wall openings within 5’ of the transformer, on either side, then the transformer MUST be 10’ or more away from the building. These clearances are to be assumed to be clear horizontally 5’ in either direction and vertically to the sky.

EL26. All existing SVP facilities, onsite or offsite, are to remain unless specifically addressed by SVP personnel by separate document. It is the Developers responsibility to maintain all clearances from equipment and easements. Developer to contact SVP outside of the PCC process for clear definitions of these clearance requirements. Developer should not assume that SVP will be removing any existing facilities without detailed design drawings from SVP indicating potential removals. Simply indicating that SVP facilities are to be removed or relocated on conceptual plans does not imply that this action has been approved by SVP.

EL27. SVP does not utilize any sub-surface (below grade) devices in its system. This includes transformers, switches, etc.

EL28. All interior meter rooms at ground level are to have direct, outside access through only ONE door. Interior electric rooms must be enclosed in a dedicated electric room and cannot be in an open warehouse or office space.

EL29. High Rise Metering and Multi-Floor Infrastructure Requirements a. Refer to UG0250 – High Density Residential Metering Requirements b. Refer to FO-1901 – Fiber Optic Splicing and Testing Methods EL30. In the case of podium-style construction, all SVP facilities and conduit systems must be located on solid ground (aka “real dirt”) and cannot be supported on parking garage ceilings or placed on top of structures.

EL31. Applicant is advised to contact SVP (CSC Electric Department) to obtain specific design and utility requirements that are required for building permit review/approval submittal. Please provide a site plan to Leonard Buttitta at 408-615-6620 to facilitate plan review.

EL32. In events where electric load demand exceeds 2MVA or service size exceeds 4000 Amps at 480V for a building, the Customer shall take service at 12KV. If electric load for a single metered location service exceeds 4.5MVA, additional 12KV service(s) may be provided. All 12KV utility connection points terminate at the Customer Switchgear.

UGEE easement up to the Customer Switchgear is required, along with an 18’ drivable space. 10’ working clearance is required in front of and behind the switchgear. 5’ working clearance is required on the sides of the switchgear (with no panels). Customer 12KV Switchgear must be located outdoors on “real dirt” unless otherwise agreed upon with SVP. SVP owns and maintains the cable/conduit up to the customer switchgear.

EL33. In events where electric service is provided at 120/208V or 277/480V the utility connection point is at the secondary compartment of SVP transformers. Customer owns and maintains the cable and conduits up to the SVP transformers.

EL34. No cross-parcel distribution is allowed. SVP service points must be within the parcels that they serve.

WATER & SEWER
W1. Recycled Water Ready: All onsite plumbing for non-domestic water uses (e.g. irrigation, industrial processes, cooling, etc.) shall be designed for recycled water use and shall comply with all Recycled Water regulations.

W2. Encroachment Permit: Prior to issuance of Building Permits, the applicant shall submit an encroachment permit application and design plans for construction of water utilities that comply with the latest edition of the Water & Sewer Utilities Water Service and Use Rules and Regulations, Water System Notes, and Water Standard Details and

Page 15 of 17 ends

Specifications. In addition, prior to the City's issuance of Occupancy, the applicant shall construct all public water utilities per the approved plans. The Water & Sewer Utilities will inspect all public water utility installations and all other improvements encroaching public water utilities.

W3. Utility Design Plans: Utility Design Plans shall indicate the pipe material and the size of existing water, recycled water and sewer main(s). The plans shall show the nearest existing fire hydrant and the two nearest existing water main line gate valves near the project area. The plans shall show meter and backflow configurations to scale and per City of Santa Clara Water & Sewer Utilities Standard Details. Note that all new water meters and backflow prevention devices shall be located behind the sidewalk in a landscape area. Fire hydrants should be located two feet behind monolithic sidewalk if sidewalk is present; two feet behind face of curb if no sidewalk is present, per City Std Detail 18. The plans shall provide the profile section details for utilities crossing water, sewer, or recycled water mains to ensure a 12” minimum vertical clearance is maintained.

W4. Utility Separations: Applicant shall adhere to and provide a note indicating that all horizontal and vertical clearances comply with State and local regulations. The applicant shall maintain a minimum 12” of vertical clearance at water service crossing with other utilities, and all required minimum horizontal clearances from water services:
10' from sanitary sewer utilities, 10’ from recycled water utilities, 8' from storm drain utilities, 5' from fire and other water utilities, 3' from abandoned water services, 5' from gas and electric utilities, and 5’ from the edge of the propose or existing driveway. For sanitary sewer, water, and recycled water utilities, the applicant shall maintain a minimum horizontal clearance of 10' from existing and proposed trees. If applicant installs tree root barriers, clearance from tree reduces to 5' (clearance must be from the edge of tree root barrier to edge of water facilities). No structures (fencing, foundation, biofiltration swales, etc.) allowed over sanitary sewer, potable water and/or recycled water utilities and easements.

W5. Separate Services: Applicant shall submit plans showing proposed water, recycled water, sanitary sewer, and fire services connected to a public main in the public right-ofway to the satisfaction of the Director of Water & Sewer Utilities. Different types of water and recycled water use (domestic, irrigation, fire) shall be served by separate water services, each separately tapped at the water main. Tapping on existing fire service line(s) is prohibited. Approved backflow prevention device(s) are required on all potable water services.

W6. City Standard Meters and Backflows: All proposed meters and backflows for all water services shall meet the current City of Santa Clara Water & Sewer Utilities Standard Details. Plans shall show meter and backflow configurations to scale.

W7. Existing Services: The applicant must indicate the disposition of all existing water and sewer services and mains on the plans. If the existing services will not be used, then the applicant shall properly abandon these services to the main per Water & Sewer Utilities standards and install a new service to accommodate the water needs of the project. The applicant shall bear the cost of any relocation or abandonment of existing Water Department facilities required for project construction to the satisfaction of the Director of Water and Sewer Utilities.

W8. On-Site Storm Drain Treatment: Prior to issuance of Building Permit, the applicant shall submit plans showing any onsite storm water treatment system. The plan shall include a section detail of the treatment system. No water, sewer, or recycled water facilities shall be located within 5-feet of any storm water treatment system.

W9. Water Usage: Prior to the issuance of Building Permits, the applicant shall provide documentation of water usage so the Water Division can verify the appropriate size of

Page 16 of 17 ends

all proposed water meters. Please note that if the existing water services are incapable of supplying the water needs to the site, the existing services shall be abandoned, and new separate dedicated water services shall be provided for each use (domestic and irrigation).

W10. Landscaping: All the landscaping for the project shall comply with the California Water Conservation in Landscaping Act, Government Code Section 65591 et. seq. All plants shall be either California native or non-invasive, low water-using or moderate waterusing plants. High water-using plants and nonfunctional turf are prohibited.

W11. Prior to issuance of Building Permits, the applicant shall submit plan details for all water features (including but not limited to fountains and ponds) designed to include provisions for operating the system without City potable water supply and capable of being physically disconnected from source of potable water supply during City declared water conservation periods, to the satisfaction of the Director of the Water & Sewer Utilities. Decorative water features may be permanently connected to the City’s recycled water supply.

W12. Easements: Prior to City’s issuance of Building or Grading Permits, the applicant shall provide a dedicated water utility easement around the backflow prevention device onsite. The water utility easement for the water services and all other public water appurtenances shall be a minimum 15 feet wide and be adjacent to the public right-ofway without overlapping any public utility easement. Additionally, the applicant shall submit plans defining existing easements so Water Division can verify if there are any conflicts with proposed easements and water utilities.

W13. Underground Fire Permit: Prior to issuance of Building Permits, applicant shall submit an underground fire permit unless otherwise waived by the Fire Department. If fire flow information is needed, applicant shall coordinate with Water and Sewer Utilities Department, for fire flow information at (408)615-2000. A dedicated fire service line, with an approved backflow prevention device, shall be used for on-site fire hydrants.

Fire service lines required for commercial and industrial use shall be sized appropriately per fire flow demand and code requirements.

W14. Record Drawings: Upon completion of construction and prior to the City’s issuance of a Certificate of Occupancy, the applicant shall provide "as-built" drawings of the public water utility infrastructure prepared by a registered civil engineer to the satisfaction of the Director of Water & Sewer Utilities Department.

W15. Water Shortage Response Actions: Pursuant to the City of Santa Clara’s Urban Water Management Plan, during times of drought or water shortage, the City implements water shortage response actions in accordance with the level of water shortage declared. All construction activities and all new irrigation connections are subject to the Water Shortage Response Actions in effect at the time of construction and connection of the irrigation service.

Water Shortage Response Actions for Stage 2 and higher include water use restrictions that limit the use of potable water such as:
a. prohibiting the installation of new potable water irrigation services. new irrigation connections, construction, and dust control.
b. restrict the use of potable water used for construction and dust control if recycled water is available.

This project is subject to all the requirements and restrictions of the Water Shortage Response Actions in place or adopted during the duration of the project. For more information, visit the City of Santa Clara Water & Sewer Utilities website at www.santaclaraca.gov/waterconservation .

ACKNOWLEDGEMENT AND ACCEPTANCE OF CONDITIONS OF APPROVAL

Page 17 of 17 ends

Permittee/Property Owner
The undersigned agrees to each condition of approval and acknowledges and hereby agrees to use the project property on the terms and conditions set forth in this permit.

Signature: _________________________________________________ Printed Name: _________________________________________________ Relationship to Property: _________________________________________________ Date: _________________________________________________ Pursuant to Santa Clara City Code 18.128.100, the applicant shall return this document to the Department, properly signed and dated, within 30-days following the date of the Acknowledgement.

COLEMAN VILLAGE
1400 COLEMAN AVENUE.

SANTA CLARA, CALIFORNIA
APPLICANT:

CITY VENTURES
115 MASON STREET

SAN FRANCISCO, CA
412
CONTACT: PAMELA NIETING
EMAIL: SQLHWLQJ#FLW\YHQWXUHV.FRP
ZZZ.FLW\YHQWXUHV.FRP
ARCHITECT:

HUNT HALE JONES ARCHITECTS
444 SPEAR STREET, SUITE 105

SAN FRANCISCO, CA
4105
CONTACT: DAN HALE
Architect
PHONE: 415.5.
EMAIL: GKDOH#KKMD.FRP
KWWSV:ZZZ.KXQWKDOHMRQHV.FRP
ENGINEER:

KIER+WRIGHT ENGINEERS
50 SCOTT BLVD, BUILDING 22

SANTA CLARA, CA
5054
CONTACT: MARK KNUDSEN
Principal
PHONE: 40.2.5
EMAIL: PNQXGVHQ#NLHUZULJKW.FRP
KWWSV:ZZZ.NLHUZULJKW.FRP
UTILITY CONSULTANTS:

TARRAR
1 FIRST ST.

BRENTWOOD, CA
451
CONTACT: ALFONSO REYES
PHONE:
4 .240.25
5 EMAIL: DUH\HV#WDUUDU.FRP
KWWSV:ZZZ.WDUUDU.FRP

LOCATION MAP
LANDSCAPE ARCHITECT:

C2 COLLABORATIVE
100 AVENIDA MIRAMAR

SAN CLEMENTE, CA
22
CONTACT: CHRIS FORTUNATO
PHONE:
4 .542.0
EMAIL: FIRUWXQDWR#F2FROODERUDWLYH.FRP
SITE

LOCATION
DESIGN REVIEW SUBMITTAL DATE: 11.10.2025
,;;,' IM' H~IJ!'j)O'l
Sa'ewav O
S0\.11~W~S1 M imes Q San Jose Mineta
International Airport
&l

CITY VENTURES
Building It Forward

CS - COVERSHEET
PO-1 - PROJECT OVERVIEW & SHEET INDEX
PI-0.1 - PROJECT INFORMATION
PI-0.2 - PROJECT INFORMATION
PH-1 - VICINITY MAP & NEIGHBORHOOD PHOTOS
SP1.1 - CONCEPTUAL ILLUSTRATIVE SITE PLAN
SP1.2 - CONCEPTUAL SITE PLAN
SS-1.0 - COLEMAN AVE. CONCEPTUAL STREETSCAPE
FS-1.0 - FIRE SAFETY SITE PLAN - LADDER PAD
FS-1.1 - FIRE SAFETY - LADDER PAD DIAGRAM

EXTERIOR ELEVATIONS
A1.0.1 - BUILDING MATERIALS & FINISHES (CONCEPT A1)
A1.0.2 - MATERIALS COLOR BOARD
A1.2.1 - CONCEPTUAL ELEVATIONS_8 PLEX
A1.3.1 - CONCEPTUAL ELEVATIONS_10 PLEX
A1.4.1 - CONCEPTUAL ELEVATIONS_10 PLEX_W STUDIO
A1.5.1 - CONCEPTUAL ELEVATIONS_14 PLEX
A1.6.1 - CONCEPTUAL ELEVATIONS_18 PLEX
A1.7.1 - CONCEPTUAL ELEVATIONS_20 PLEX

BUILDING PLANS
A2.2.1 - CONCEPTUAL 1ST FLOOR 8-PLEX
A2.2.2 - CONCEPTUAL 2ND FLOOR 8-PLEX
A2.2.3 - CONCEPTUAL 3RD FLOOR 8-PLEX
A2.2.4 - CONCEPTUAL 4TH FLOOR 8-PLEX
A2.2.5 - CONCEPTUAL ROOF PLAN 8-PLEX
A2.3.1 - CONCEPTUAL 1ST FLOOR 10-PLEX
A2.3.2 - CONCEPTUAL 2ND FLOOR 10-PLEX
A2.3.3 - CONCEPTUAL 3RD FLOOR 10-PLEX
A2.3.4 - CONCEPTUAL 4TH FLOOR 10-PLEX
A2.3.5 - CONCEPTUAL ROOF PLAN 10-PLEX
A2.4.1 - CONCEPTUAL 1ST-4TH BP_10 PLEX W-STUDIO
A2.4.2 - CONCEPTUAL RP_10 PLEX W-STUDIO
A2.5.1 - CONCEPTUAL 1ST BP_14 PLEX
A2.5.2 - CONCEPTUAL 2ND BP_14 PLEX
A2.5.3 - CONCEPTUAL 3RD BP_14 PLEX
A2.5.4 - CONCEPTUAL 4TH BP_14 PLEX
A2.5.5 - CONCEPTUAL RP_14 PLEX
A2.6.1 - CONCEPTUAL 1ST BP_18 PLEX
A2.6.2 - CONCEPTUAL 2ND BP_18 PLEX
A2.6.3 - CONCEPTUAL 3RD BP_18 PLEX
A2.6.4 - CONCEPTUAL 4TH BP_18 PLEX
A2.6.5 - CONCEPTUAL RP_18 PLEX
A2.7.1 - CONCEPTUAL 1ST_2ND BP- 20 PLEX
A2.7.2 - CONCEPTUAL 3RD_4TH BP- 20 PLEX
A2.7.3 - CONCEPTUAL RP_20 PLEX

UNIT PLANS
A3.1.1 - CONCEPTUAL PLAN 1A-1B_1ST AND 2ND FLOORS
A3.1.2 - CONCEPTUAL PLAN 1A_1B _1ST AND 2ND_ADA
A3.1.3 - CONCEPTUAL PLAN 1A-1B_3RD AND 4TH FLOORS
A3.2.1 - CONCEPTUAL PLAN 2
A3.2.2 - CONCEPTUAL PLAN 2 ADA
A3.4.1 - CONCEPTUAL UNIT PLANS 4 AND 5
A3.4.1B - CONCEPTUAL 4-BEDROOM OPTION
A3.4.2 - CONCEPTUAL UNIT PLAN 5 (ADA)
A3.4.2 B - CONCEPTUAL PLAN 4_AEGING IN PLACE PLAN
A4.1.1 - CONCEPT DETAILS

TABLE OF CONTENTS

ARCHITECTURAL PROJECT OVERVIEW
CITY VENTURES TO PRESENT OUR PROPOSAL OF A PREMIER DEVELOPMENT LOCATED AT 1400 COLEMAN AVE IN THE CITY OF SANTA CLARA.  THIS COMMUNITY IS DESIGNED TO ENGAGE THE URBAN SETTING WITH THE CREATION OF COLEMAN VILLAGE.  THE ARCHITECTURE, URBAN IN NATURE HISTORICALLY REFERENCES THE AREAS INDUSTRIAL AND COMMERCIAL HERITAGE TO SANTA CLARA, WILL OFFER MULTIPLE LIVING EXPERIENCES.  THE PROPOSED DEVELOPMENT WILL CAPTURE AN URBAN STYLE FOR FAMILIES TO GROW AND THRIVE.  PASEOS AND PRIVATE SPACES HAVE BEEN THOUGHTFULLY DESIGNED TO PROVIDE CONNECTIVITY FOR ALL RESIDENTS TO ENJOY.  THE OUTDOOR SPACE WILL PROVIDE A SERENE ENVIRONMENT FOR RESIDENTS TO RELAX, SOCIALIZE, AND ENJOY OUTDOOR ACTIVITIES. CITY VENTURES IS REQUESTING AN ARCHITECTURAL REVIEW, VESTING TENTATIVE TRACT MAP PERMIT, GENERAL PLAN AMENDMENT, REZONING AND DENSITY BONUS CONCESSION AND WAIVERS PROPERTY DESCRIPTION THE PROPERTY LOCATED AT 1400 COLEMAN AVENUE CONSISTS OF APPROXIMATELY 3.78 ACRES. IT IS SURROUNDED BY COMMERCIAL USES CONSISTING OF LARGE FORM 1-2 STORY BUILDINGS AND ASPHALT PARKING LOTS ON ALL SIDES. ACROSS COLEMAN AVENUE AND THE PROPERTY EXISTS A SMALL RETAIL CENTER AND COSTCO. THE PROJECT IS LOCATED WITHIN 0.5 MILES OF THE SANTA CLARA CALTRAIN STATION, A MAJOR TRANSIT STOP AS DEFINED IN SECTION 2115 OF THE PUBLIC RESOURCES CODE, AND PROVIDES TRANSIT CONNECTIONS TO VALLEY TRANSPORTATION AUTHORITY, THE CAPITAL CORRIDOR AND THE ALTAMONT CORRIDOR EXPRESS. THE PROPERTY IS WITHIN THE SANTA CLARA STATION AREA PLAN AS OF THE DATE OF THIS LETTER, THE SANTA CLARA STATION AREA PLAN IS STILL UNDER DEVELOPMENT BY THE CITY OF SANTA CLARA. AND HAS A GENERAL PLAN USE DESIGNATION OF REGIONAL COMMERCIAL AND IS ZONED LIGHT INDUSTRIAL. THE EXISTING USE OF THE SITE COMMERCIAL AND INCLUDES TWO LARGE COMMERCIAL BUILDINGS THAT ENCUMBER ROUGHLY 32% OF THE SITE. THE LARGEST BUILDING SITS AT THE CENTER OF THE SITE WITH THE SECOND RECTANGULAR STANDALONE BUILDING AT THE FAR NORTH END OF THE SITE. THE BUILDINGS ARE SURROUNDED BY ASPHALT PARKING. PROJECT PROPOSAL THE PROJECT WILL HOST A WIDE RANGE OF HOME OPTIONS TO HELP ATTRACT ENTRY LEVEL AND THE MISSING MIDDLE HOMEOWNERS WITH 142 FOR-SALE SOLAR ALL-ELECTRIC ATTACHED 4-STORY TOWNHOME STYLE HOMES. THE TOWNHOMES RANGE IN SIZE FROM 377 SQUARE FEET TO 2,003 SQUARE FEET. THE HOMES INCLUDE ONE AND TWO-CAR PRIVATE GARAGE AND THE SITE WILL INCLUDE SURFACE PARKING FOR ITS RESIDENTS AND GUESTS. ACCESS TO THE PROJECT WILL BE VIA A 26-FOOT-WIDE PEDESTRIAN ORIENTED URBAN STREETSCAPE WITH BENCHES, PAVERS AND TREES LOCATED AT THE CENTER OF THE PROJECT. SMALLER DRIVE AISLES AND LANDSCAPED PASEOS CONNECT TO THE URBAN STREETSCAPE TYING ALL THE HOMES BACK TO COLEMAN FOR A SEAMLESS CONNECTION. THE PROJECT CONTAINS SEVERAL  CURATED  COMMUNITY GATHERING PLACE FOR ITS RESIDENTS. AT THE NORTHEAST  QUADRANT  OF THE SITE, A COMMUNITY GARDEN WITH RAISED PLANTER AND A STONE FRUIT ESPALIER WILL BE PROVIDED. AN ENCLOSED DOG PARK WILL BE INCLUDED ADJACENT TO COMMON AREA LANDSCAPE. ALONG THE SOUTHEAST QUADRANT OF THE SITE AN OUTDOOR SEATING AREA WITH A SHADE STRUCTURE AND BARBECUES WILL BE PROVIDED. LASTLY, AT THE CENTER OF THE SITE, A LANDSCAPE COMMON AREA IS PLANNED OFF THE URBAN STREETSCAPE FOR GENERAL COMMUNITY PROGRAMMING. LAND USE THE PROJECT  IS  PROPOSING A  GENERAL  PLAN  (GP)  AMENDMENT FROM  GENERAL  COMMERCIAL TO HIGH DENSITY RESIDENTIAL (37-50  UNITS/ACRE)  AND A REZONE FROM ML-LIGHT INDUSTRIAL TO HIGH DENSITY RESIDENTIAL R4 (37-60 UNITS/ACRE). THE PROJECT  IS  A  HOUSING  DEVELOPMENT PROJECT WITHIN THE MEANING OF GOVERNMENT CODE SECTION65589.5(H)(2) AND HAS BEEN DESIGNED TO COMPLY WITH VISION OF THE AREA. THE PROJECT QUALIFIES FOR A MITIGATED NEGATIVE DECLARATION CONSISTENT WITH THE REQUIREMENTS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) AS THE PROJECT WOULD NOT RESULT IN A SIGNIFICANT AND UNAVOIDABLE IMPACT UNDER PUBLIC RESOURCES CODE SECTION 21064.5 AND QUALIFIES TO BE EXEMPT FROM PARKING REQUIREMENTS PER ASSEMBLY BILL NO. 2097 AND GOV. CODE SECTION 65863.2. AFFORDABLE HOUSING AND STATE DENSITY BONUS LAW THE PROJECT WILL BE PROVIDING ON-SITE AFFORDABLE HOUSING 20% OF THE FOR-SALE DWELLING UNITS BEING RESTRICTED FOR VERY LOW, LOW- AND MODERATE-INCOME HOUSEHOLDS. AS A RESULT OF THE INCLUSION OF AT LEAST 10% OF THE UNITS IN THE FOR-SALE DEVELOPMENT RESTRICTED TO MODERATE INCOME, THE PROJECT  IS  ELIGIBLE FOR WAIVERS AND REDUCTIONS TO DEVELOPMENT STANDARDS THAT HAVE THE EFFECT OF PHYSICALLY PRECLUDING THE CONSTRUCTION OF A DEVELOPMENT (GC SECTION 65915(B)1)) AND INCENTIVES OR CONCESSIONS (GC  SECTION  65915(D)(1) PURSUANT TO STATE DENSITY BONUS LAW. CITY VENTURES  IS  PROPOSING WAIVERS AND A CONCESSION AS DEFINED ON PROJECT OVERVIEW SHEETS, WHILE RESERVING THE RIGHT TO USE ADDITIONAL WAIVERS IN THE FUTURE. WE ARE EXCITED TO COLLABORATE WITH THE CITY OF SANTA CLARA TO PURSUE A PROJECT THAT WILL BRING VIBRANCY AND MUCH-NEEDED HOUSING TO THE NEIGHBORHOOD. WE LOOK FORWARD TO BRINGING THIS COMMUNITY TO FRUITION.  WE LOOK FORWARD TO WORKING WITH THE CITY TO ADDRESS THE CRITICAL NEED FOR NEW HOUSING WITH SOLAR ALL ELECTRIC TOWNHOME STYLE UNITS.

CIVIL
TM-1.0 COVER SHEET
TM-2.1 EXISTING CONDITIONS PLAN
TM-2.2 PRELIMINARY DEMOLITION PLAN
TM-3.1 VESTING TENTATIVE MAP
TM-4.1 PRELIMINARY CIVIL SITE PLAN
TM-5.1 PRELIMINARY GRADING AND DRAINAGE PLAN
TM-6.1 PRELIMINARY UTILITY PLAN
TM-7.1 PRELIMINARY STORMWATER QUALITY CONTROL PLAN
TM-7.2 PRELIMINARY STORMWATER QUALITY CALCULATIONS
TM-8.1 PRELIMINARY SITE FIRE ACCESS PLAN
TM-9.1 REFUSE COLLECTION ACCESS EXHIBIT -ENTER
TM-9.2 REFUSE COLLECTION ACCESS EXHIBIT -EXIT

LANSDSCAPE
L-1 CONCEPT IMAGERY
L-2 CONCEPTUAL LANDSCAPE PLAN
L-3 CONCEPTUAL LANDSCAPE ENLARGEMENTS
L-4 CONCEPTUAL WALL AND FENCE PLAN
L-5 CONCEPTUAL CIRCULATION PLAN
L-6 CONCEPTUAL PLANTING PALETTE
L-7 CONCEPTUAL ARBORIST REPORT AND TREE REMOVAL
L-8 CONCEPTUAL LANDSCAPE PLAN (WELO)

JOINT TRENCH
JT1 CONCEPTUAL JOINT TRENCH AND STREET LIGHTING PLAN

DENSITY BONUS

CONCESSIONS APPLICANT RESERVES THE RIGHT TO REQUEST ADDITIONAL INCENTIVES AND WAIVERS AS ALLOWED UNDER SDBL WAIVERS SANTA CLARA CITY CODE 18.10 R-4 DEVELOPMENT STANDARDS REQUIRED PROPOSED SIDE SETBACK 10 FT. 5 FT.

REAR SETBACK 20 FT. 9 FT.

LENGTH OF DRIVEWAY 20 FT. 3 FT.

PRIVATE OPEN SPACE 60 SQ. FT. / UNIT PLANS 1 & 2 PROVIDE NO OPEN SPACE
COMMON OPEN SPACE 200 SQ. FT. / UNIT = 28,600 SQ. FT. 19,600 SQ. FT. SANTA CLARA CITY CODE 18.38 OFFSTREET PARKING REGULATIONS

TWO AND THREE BEDROOM UNITS
(0.5) SPACES/ UNIT UNBUNDLED 98 UNITS X 0.5 = 49 2 SPACES

PROJECT OVERVIEW & SHEET INDEX

COLEMAN VILLAGE

CITY VENTURES

PROJECT DATA
1400 COLEMAN AVENUE, SAN CLARA, CA 945050 APN: 230-05-021 EXISTING - REQUIRED PROPOSED

GENERAL PLAN REGIONAL COMMERCIAL HIGH DENSITY RESIDENTIAL ZONING ML - LIGHT INDUSTRIAL HDR / R-4
SITE AREA 8500 SQ. FT. GROSS:3.79 AC/165,092 SF(NET: 3.2 AC) STRUCTURE COVERAGE (>10,000 SF) 12,719 SQ. FT. = 7.8% 40,126 SQ. FT. = 25.3% DENSITY 37-50 DUA = 141 UNITS MIN. 142 UNITS / 37.7 DUA GROSS TOTAL DWELLING UNITS 142 UNITS
NO. EXST'G BLDGS /NO. PROPOSED BLDGS (1) EXISTING BUILDING / (12) PROPOSED BUILDINGS

FEMA FLOOD ZONE ZONE X - AREA WITH REDUCED FLOOD RISK DUE TO LEVEE

OCCUPANCY -
RESIDENTIAL /GARAGE R2 / U

CONSTRUCTION TYPE -
4- STORY RESIDENTIAL VA
ACCESSIBLE UNITS 10% OF MULTISTORY DWELLING
UNITS =10% (142) = 15 UNITS 15 UNITS LOCATION SEE SP R-4 ZONING STANDARDS

REQUIRED PROPOSED
MAX. BUILDING HEIGHT 80' ±50 FT MAX. STORIES 8 4 STORIES REQUIRED SETBACKS

REQUIRED PROPOSED

SETBACKS
FRONT 10' 14' MIN.

SIDE INTERIOR 10' *5' REAR 20' *9' LENGTH OF DRIVEWAY APPROACH 20' *3' RECREATION SPACE FOR MULTIFAMILY DWELLINGS PRIVATE RECREATION 60 SQ. FT./UNIT
*PLANS 4 & 5 MEET STANDARDS. PLANS
1 & 2 DO NOT PROVIDE PRIVATE OPEN
SPACE. SEE UNIT DATA
COMMON RECREATION SPACE 200 SQ. FT. X 142 UNITS = 28,400 SQ. FT. 9,550 + 3,860 + 4,200 = *17,600 SQ. FT.

AUTO PARKING (SEE SHEET PI - 0.2 FOR MORE DETAILED INFORMATION) REQUIRED PROPOSED PRIVATE GARAGE PARKING 1 SPACE / UNIT @ STUDIO / 1BD

1.5 SPACES/UNIT @ 2-3 BD
(1 ASSIGNED 0.5 UNBUNDLED)
(82)2-CAR /(30)1- CAR= 194 TOTAL
RESERVED OPEN SURFACE PARKING 38 TOTAL
GUEST PARKING 1 TOTAL
TOTAL 1.0 X 42 UNITS = 42 SPACES

1.5 X 101 UNITS = 152 SPACES

0.05 X 143 = 7 (G) SPACES
201 TOTAL SPACES REQ'D
233 TOTAL SPACES PLUS
1 EV SPACE AND 1 CAR SHARE SPACE BICYCLE PARKING (SEE SHEET PI - 1.1 FOR INFORMATION) FIRE PROTECTION - TOWNHOME UNITS FIRE SPRINKLER NFPA - 13
* STATE DENSITY BONUS LAW PROPOSED AND WAIVERS REQUESTED. AFFORDABLE HOUSING PLAN

AFFORDABLE HOUSING REQUIRED TOTAL AFFORDABILITY LEVEL BMR UNITS BY TYPE UNIT TOTALS
20% DENSITY BONUS APPLICATION
(0.20 X 142 UNITS) =
29 UNITS COMBINATION OF VERY
LOW, LOW & MODERATE AREA MEDIUM INCOME STUDIO 1BD/1BA 2 BD/1 BA 3BD/3BA 8 7 6 8 29
BLDG. UNIT SUMMARY
BLDGS. PLANS TOTAL UNITS
PLAN
1A.1 PLAN1A.2 PLAN1B
PLAN
2A
PLAN
2B
PLAN
4 PLAN4X PLAN
5 BLDG. A
10 UNITS - - - - - 5 - 5 10 BLDG. B
10 UNITS - - - - - 3 2 5 10 BLDG. D
10 UNITS - - - - - 3 2 5 10 BLDG. E
10 UNITS - - - - - 3 2 5 10 BLDG. F
14 UNITS 1 1 2 1 1 2 2 4 14 BLDG. G
14 UNITS 1 1 2 1 1 2 2 4 14 BLDG. H
8 UNITS - - - - - 4 - 4 8 BLDG. J 8 UNITS - - - - - 4 - 4 8 BLDG. K 10 UNITS 2 2 4 1 1 - - - 10 BLDG. L 20 UNITS 4 4 8 2 2 - - - 20 BLDG. M 18 UNITS 3 3 6 3 3 - - 18 BLDG. N
10 UNITS - - - - - 5 - 5 10
TOTAL 11 11 22 8 8 31 10 41 142

BUILDING AREA SUMMARY
BLDGS. TOTAL AREA

FIRST FLOORSECOND
FLOOR
THIRD
FLOOR
FOURTH
FLOOR
BLDG. A
10 UNITS 5884 5900 5444 5185 22413 BLDG. B
10 UNITS 5884 5900 5444 5185 22413 BLDG. D
10 UNITS 5884 5900 5444 5185 22413 BLDG. E
10 UNITS 5884 5900 5444 5185 22413 BLDG. F
14 UNITS 5940 6190 6100 5914 24144 BLDG. G
14 UNITS 5940 6190 6100 5914 24144 BLDG. H
8 UNITS 4710 4723 4351 4207 17991 BLDG. J 8 UNITS 4710 4723 4351 4207 17991 BLDG. K 10 UNITS 2184 2356 2356 2356 9252 BLDG. L 20 UNITS 3993 4726 4726 4726 18171 BLDG. M 18 UNITS 4096 4409 4409 4409 17323 BLDG. N
10 UNITS 5884 5900 5444 5185 22413
TOTAL 40126 40703 38327 36775 241081 NOTES: · ALL AREAS CALCULATED ARE GROSS

UNIT SUMMARY

TOWNHOMES / MARKET RATE
PLAN NO. BDRM BATH TOT. UNITS
TOT. BDRM
TOT. LIVING
COMMON

STAIR/ UTILITY GARAGE DECKS PARKING

UNIT LIV SF/ PLAN TYPE GARAGE
TOTAL SF DECKTOTAL SF GROSSSF PLAN 1A.1 1 1 11 11 827 343 360 0 1 9097 3960 0 13057 PLAN 1A.2 1 1 11 11 827 0 304 0 1 9097 3344 0 12441 PLAN 1B (ST) 0 1 22 0 377 0 0 0 0 8294 0 0 8294 PLAN 2A 2 1 8 16 998 364 364 0 1 7984 2912 0 10896 PLAN 2B (ST) 0 1 8 0 452 0 0 0 0 3616 0 0 3616 PLAN 4 3 2 31 93 1532 0 461 52 2 47492 14291 1612 63395 PLAN 4X ADA OPTIONAL BD 4 3 2.5 10 30 1843 0 652 70 2 18430 6520 700 25650 PLAN 5 OPTIONAL BD 4 3 2.5 41 123 2003 600 461 77 2 82123 18901 3157 104181 TOWNHOME TOTAL 142 284 186133 49928 5469 241530
SCALE: PROJECT INFORMATIONNTS
C H U N T H A L E J O N E S A R C H I T E C T S DATE: PROJECT: COLEMAN VILLAGE

CITY VENTURES
1400 COLEMAN AVE.

SANTA CLARA, CALIFORNIA 95050

11.10. 2025
317082

CITY VENTURES
Building It Forward II I ITARRAR I iITiufVlWCOHS ULTRHTS ~ KIER+WRIGHT

PROJECT PARKING
CALIF. CODES SANTA CLARA CODE PROPOSED NOTES
PARKING TABLE 3.3 - RESIDENTIAL MULTIFAMILY
STUDIO / 1BD - 52 UNITS 1 SPACE / UNIT = 52 SPACES 52 UNITS W/ 22 COVERED & 30 OPEN SURFACE ASSIGNED 52 SPACES 2 / 3 BD UNITS - 90 UNITS

1.5 SPACES PER UNIT / 1 ASSGN'D _0.5 UNBUNDLD
(90 UNITS)(1.5) = 135 SPACES
COV.-2/UNIT @ 82 UNITS = 164
COV.- 1/UNIT @ 8 UNITS = 8 OPEN SURFACE ASSIGNED - 8 SPACES 180 SPACES
180 SPACES
GUEST N/A 1 SPACES 1 SPACES
TOTAL PARKING 194 SPACES
194 GARAGE SPACES
39 SURFACE SPACES
246 TOTAL 234 TOTAL SPACES

ACCESSIBILITY

ASSIGNED
CBC SECT. 1109A.4
2% OF ASSIGNED SPACES x 232 SPACES =

4.64 = 5 SPACES N/A 5 SPACES

LOCATION TO BE FINALIZED AT CONSTRUCTION DOCUMENTS
PHASE

UNASSIGNED
CBC SECT. 1109A.5
5% OF SPACES x 2 SPACES =1 SPACES N/A 1 SPACE SEE SP

EV SPACE -

RESIDENTIAL
CAPABLE CAL GRN SECT. 4.106.4.2.210% OF SPACES x 234 = 23.4 SPACES = 24- 24 SPACES

LOCATION TO BE FINALIZED AT CONSTRUCTION DOCUMENTS
PHASE
READY CAL GRN SECT. 4.106.4.2.225% OF SPACES x 234 =59 SPACES- 59 SPACES

LOCATION TO BE FINALIZED AT CONSTRUCTION DOCUMENTS
PHASE
CHARGER CAL GRN SECT. 4.106.4.2.25% OF SPACES x 234 = 11.7 SPACES = 12- 12 SPACES

LOCATION TO BE FINALIZED AT CONSTRUCTION DOCUMENTS
PHASE

BICYCLE

RESIDENTIAL SHORT TERM
(CLASS II VISITOR) CAL GRN. A4.106.9.1
(VOLUNTARY) 5% OF GUEST PRKG = 5% x 2 SPACES = 0.1 = 1 SPACESTABLE 3.4 1 PER 20 UNITS =7.15 =
7 SPACES
7 SPACES SEE LANDSCAPE PLANS

LONG TERM
(CLASS I IN UNIT) CAL GRN. A4.106.9.3
(VOLUNTARY) 1/ UNIT = 142 = 142 SPACES
TABLE 3.4
1 PER UNIT
TOWNHOMES - 1 PER UNIT W/ ELECTRICAL OUTLET PODIUM - BIKE ROOMS REQUIRED WITH 1 OUTLET PER 10 BIKES AND A REPAIR

STATION
1 SPACE / UNIT IN EACH GARAGE PROVIDED = 112 SPACES112 SPACES WITHIN GARAGES WITH 30 STUDIOS IN SHARED GARAGE = 142 BLDG. AUTO PARKING SUMMARY

BLDG PLAN COVERED GARAGE

PARKING OPEN SURFACE

PARKING - ASSIGNED

TOTAL SPACES/ BUILDING

TOTAL AL BUILDINGS
8 PLEX (2 BLDGS. H & J)
- (4) 3 BEDROOM PLAN 4 - 2 T /UNIT 8 0
16 32
- (4) 3 BEDROOM PLAN 5 - 2 T / UNIT 8 0
10 PLEX (5 BLDGS. A, B, D, E & N)
- (5) 3 BEDROOM PLAN 4 - 2 T /UNIT 10 0
20 100
- (5) 3 BEDROOM PLAN 5 - 2 T / UNIT 10 0
10 PLEX W/ STUDIO (1 BLDG. K)
- STUDIO STUDIOS - 5 UNITS 0 5
11 11 - 1 BEDROOM PLAN 1 - 4 UNITS 4 0
- 2 BEDROOM PLAN 2 -1 UNIT 1 1
14 PLEX (2 BLDGS F & G)
- STUDIO STUDIO -3 UNITS 0 3
23 46
- 1 BEDROOM PLAN 1 - 2 UNITS 2 0
- 2 BEDROOM PLAN 2 - 1 UNIT 1 1
- 3 BEDROOM PLAN 4 - 4 UNITS 8 0
- 3 BEDROOM PLAN 5 - 4 UNITS 8 0
18 PLEX (1 BLDG. M)
- STUDIO STUDIO - 9 UNITS 0 9
- 1 BEDROOM PLAN 1 - 6 UNITS 6 0 21 21
- 2 BEDROOM PLAN 2 - 3 UNIT 3 3
20 PLEX (1 BLDG L)
- STUDIO STUDIO -10 UNITS 0 10
- 1 BEDROOM PLAN 1 - 8 UNITS 8 0 22 22
- 2 BEDROOM PLAN 2 - 2 UNIT 2 2 GUEST 2 1 GUEST EV 1 CAR SHARE 1 TOTAL PARKING 235 REACH CODE ELECTRIC VEHICLE PARKING

FOR MULTIFAMILY HOUSING
· OVER 20 UNITS WITH ASSIGNED PARKING ON THE PROJECT (142 UNITS) ·· FIRST 20 DWELLINGS - ONE LVL2 READY PER DWELLING ·· 25% OF REMAINING UNITS WITH ASSIGNED SPACES - LVL2 READY ·· 75% OF REMAINING UNITS WITH ASSIGNED SPACES - LP LVL2 READY ·· AFFORDABLE UNITS WITH PARKING - 10% LVL2 READY, 90% LVL1 READY C H U N T H A L E J O N E S A R C H I T E C T S DATE: PROJECT: COLEMAN VILLAGE

CITY VENTURES
1400 COLEMAN AVE.

SANTA CLARA, CALIFORNIA 95050

11.10. 2025
317082 SCALE: PROJECT INFORMATION
NTS
CITY VENTURES Building It Forward
TARRAR I UTI LITY lilJCOH SULTA HTS ---
HUNT
HALE
lill\l f=~
I
I I
I I
I
I
C I- Collaborative
~ KIER+WRIGHT
SITE

LOCATION
VIEW NO. 1b - LOOK IN TO SITE LOCATION

VICINITY MAP
4 3
2 VIEW NO. 2 - RIGHT SIDE NEIGHBOR FROM CORNER OF COLEMAN AND

CARL LOOKING TO PARKING AREA
VIEW NO. 3 - LEFT SIDE NEIGHBOR FROM COLEMAN AVE. LOOKING TO JB TROPHIES & CUSTOM FRAMES 1a
1b
VIEW NO. 1a - LOOK IN TO SITE LOCATION
VIEW NO. 4 - ACROSS THE STREET NEIGHBOR FROM COLEMAN AVE.

SCALE: VICINITY MAP & NEIGHBORHOOD PHOTOSNTS
C H U N T H A L E J O N E S A R C H I T E C T S DATE: PROJECT: COLEMAN VILLAGE

CITY VENTURES
1400 COLEMAN AVE.

SANTA CLARA, CALIFORNIA 95050

11.10. 2025
317082
0 Merr8el Ramen t!°I
Ra'men• .S T
38Carmodz,~
&l
CITY VENTURES 811il'ine It forvo3r,:I
J.~ l~ ~~ I
Rich
ra
--
PH-1
PASEO
7- 4- STORY

TOWNHOMES
10 - 4 STORY

STACKED

TOWNHOMES
8 - 4 STORY

STACKED

TOWNHOMES
PASEO

PASEO MEWS

MEWS MEWS MEWS
DRIVE

AISLE DRIVEAISLE
DRIVE
AISLE

R R R R

R R R R R R R R R R
8 4 6

R R R R R R R R
10 2 2
7 R R R R R R R
R R
SCALE: CONCEPTUAL ILLUSTRATIVE SITE PLANNTS
C H U N T H A L E J O N E S A R C H I T E C T S DATE: PROJECT: COLEMAN VILLAGE

CITY VENTURES
1400 COLEMAN AVE.

SANTA CLARA, CALIFORNIA 95050

11.10. 2025
317082
~ CITY VENTURES Building It Forward
TARRAR I UTILI TY ~ TRH TS
HUNT
HALE
JONES
C Collaborative
~ KIER+WRIGHT
I 1
59'-8" 4'-111
2 " 26'-0" 4'-1" 53'-6" 74'-5" 4'-6" 26'-0" 4'-6" 59'-8" 24'-4" 59'-8" 26'-0" 47'-6" 60'-7" 40'-61 2 "
53'-5" 23'-912
" 30'-51
2 " 3'-3" 26'-0" 54'-3" 26'-0" 94'-0" 24'-0" 6'-6" 53'-61 2 53'-5" " 9'-0" 3'-6"
4'-6" 4'-6" 10'-0" SETBACK 10'-0" SETBACK
PLANS 4 & 5
8 UNITS BLDG H
PLANS 4 & 5
8 UNITS BLDG J 10 STUDIOS20 UNITS BLDG L 9 STUDIOS18 UNITS BLDG M PLANS 4 & 5
10 UNITS BLDG N

CS R R R R R R
6 1
5 STUDIOS
10 UNITS BLDG K
4 (1) BED
1 (2) BED
PLANS 1 & 2
8 (1) BED
2 (2) BED
PLANS 1 & 2 PLANS 1 & 2 0 30' 60' 90'

BUILDING AND SITE SUMMARY
SITE AREA : 3.79 ACRES GROSS/3.2 ACRES NET
(1) - 20 UNIT BLDG 20 UNITS
(1) - 18 UNIT BLDG 18 UNITS
(2) - 14 UNIT BLDGS 28 UNITS
(6) - 10 UNIT BLDGS 60 UNITS
(2) - 8 UNIT BLDGS 16 UNITS
TOTAL 142 UNITS

3.79 ACRE SITE
142 UNITS / 3.79 AC = 37.46 DUA

PARKING
· EXTERIOR SURFACE PARKING
·· 30 DEDICATED TO STUDIOS
·· 8 DEDICTED TO 2-BEDROOM UNITS
·· 1 GUEST SPACES
·· 39 TOTAL SURFACE PARKING
· UNIT GARAGE PARKING
·· 30 SINGLE CAR GARAGES
·· 82 (2) CAR GARAGES (164 TOTAL) ·· 194 TOTAL GARAGE SPACES · 233 TOTAL SPACES
· PLUS ONE SURFACE EV
· PLUS ONE RIDE SHARE SPACE
· 235 TOTAL SPACES

UNIT SUMMARY
(22)- PLAN 1A 827 SQ. FT. 1BD
(22)- PLAN 1 B 377 SQ. FT. STUDIO
(8)- PLAN 2A 998 SQ. FT. 2-BED
(8)- PLAN 2B 452 SQ. FT. STUDIO
(41)- PLAN 4 1,530 SQ. FT. 3-BED
(41)- PLAN 5 2,000 SQ. FT. 3-BED
(142) TOTAL UNITS

PLANS 4 & 5
10 UNITS BLDG A
PLANS 4 & 5
10 UNITS BLDG B
PLANS 4 & 5
10 UNITS BLDG D
PLANS 4 & 5
10 UNITS BLDG E
3 STUDIOS
14 UNITS BLDG F
3 STUDIOS
14 UNITS BLDG G
2 (1) BED
1 (2) BED
PLANS 1, 2, 4 & 5
8 (3) BED
2 (1) BED
1 (2) BED
PLANS 1, 2, 4 & 5
8 (3) BED

R R R R R R R R R R
11 10'-0"
32'-0" CLEAR BETWEEN BUILDINGS
34'-0" CLEAR BETWEEN BUILDINGS
32'-0" BUILDING
CLEARANCE AT GRADE 15'-0" 5'-52
1 " 5'-7"
32'-0" CLEAR BETWEEN BUILDINGS 5'-0" 5'-0"5'-0"
27'-0" CLEAR BETWEEN BUILDINGS
1 2
5 10'-0"
R R

R R R R R
59'-8" 5'-4
1 2
"
33'-91
2 "
24'-0"
11'-5" 15'-0" SETBACK 10'-0" SETBACK 7'-22
1 " 5'-7" 110'-10" 15'-0" 26'-0" 15'-0" 24'-0"
26'-0" DRIVE AISLE 24'-0" DRIVE AISLE
26'-0" ACCESS
26'-0" CLEAR TO SKY
26'-0" DRIVE AISLE
R R 10'-2" 10'-2" 15'-72
1 " 20'-7" 15'-0" 15'-0" 15'-0" 15'-0" 20'-9"
20'-0" SETBACK
20'-0" SETBACK
14'-41
2 "
32'-0" CLEAR BETWEEN BUILDINGS
26'-0" DRIVE AISLE
32'-0" CLEAR BETWEEN BUILDINGS
26'-0" DRIVE AISLE
3'-0"
R
26'-0"
5'-0"
8 R R R R R R R R
R
R
R
R
2 2
26'-0" DRIVE AISLE
26'-0" DRIVE AISLE
29'-0" DRIVE AISLE
EV G
= LOCATION OF BMR UNITS
(2) BOXES INDICATE BOTH STACKED UNITS ARE BMR UNITS = LOCATION OF ACCESSIBLE UNITS

BLDG LEGEND
BLDG

X UNITS

BLDG NUMBER
TOTAL UNIT GENERAL NOTE: FOR ACCESSIBLE ROUTE AND GARBAGE TRUCK INFO SEE CIVIL DRAWING. FOR BIKE PARKING INFO, SEE LANDSCAPE DRAWING.

ADA UNIT NOTE: 10% OF THE TOTAL UNIT WILL BE ACCESSIBLE · 142 TOTAL UNITS PROPOSED X 10% = 15 ACCESSIBLE UNIT BLDG TYPES RESIDENTIAL ROWHOUSE STYLE CONDOMINIUM *BMR
*BMR
*BMR
*BMR
*BMR *BMR *BMR *BMR
*BMR *BMR
*BMR
*BMR
*BMR
*BMR *BMR *BMR *BMR
*BMR
*BMR *BMR
*BMR *BMR
*BMR
*BMR
*BMR
*BMR
= ACCESSIBLE ROUTE *BMR *BMR
*BMR
2 *BMR
SCALE: CONCEPTUAL SITE PLAN
SP1.2
1" = 30'-0" C H U N T H A L E J O N E S A R C H I T E C T S DATE: PROJECT: COLEMAN VILLAGE

CITY VENTURES
1400 COLEMAN AVE.

SANTA CLARA, CALIFORNIA 95050

11.10. 2025
317082
~ CITY VENTURES Building It Forward
TARRAR I UTILI TY ~ TRH TS
HUNT
HALE
JONES
,_____,I~

6. [~
NORTH
C Collaborative
~ KIER+WRIGHT
COLEMAN AVE. STREETSCAPE
SCALE: COLEMAN AVE. CONCEPTUAL STREETSCAPEN.T.S. C H U N T H A L E J O N E S A R C H I T E C T S DATE: PROJECT: COLEMAN VILLAGE

CITY VENTURES
1400 COLEMAN AVE.

SANTA CLARA, CALIFORNIA 95050

11.10. 2025
317082
~ CITY VENTURES Building It Forward
TARRAR I UTILIT'l' ll;_ COH SULTRHTS
HUNT
HALE
JONES
C Collaborative
~ KIER+WRIGHT
-1
0 30' 60' 90' PLANS 4 & 5
8 UNITS BLDG H
PLANS 4 & 5
8 UNITS BLDG J 10 STUDIOS
20 UNITS BLDG L 3 STUDIOS
12 UNITS BLDG M
PLANS 4 & 5
10 UNITS BLDG N
5 STUDIOS
10 UNITS BLDG K
4 (1) BED
1 (2) BED
PLANS 1 & 2
8 (1) BED
2 (2) BED
PLANS 1 & 2
8 (1) BED
2 (2) BED
PLANS 1, 2, 4 & 5
6 (3) BED
PLANS 4 & 5
10 UNITS BLDG A
PLANS 4 & 5
10 UNITS BLDG B
PLANS 4 & 5
10 UNITS BLDG D
PLANS 4 & 5
10 UNITS BLDG E
3 STUDIOS
14 UNITS BLDG F
3 STUDIOS
14 UNITS BLDG G
2 (1) BED
1 (2) BED
PLANS 1, 2, 4 & 5
8 (3) BED
2 (1) BED
1 (2) BED
PLANS 1, 2, 4 & 5
8 (3) BED 6'-0" 4'-0" 2'-0"

LADDER PAD
4'-0" LADDER

BASE REAR CLEAR
SCALE: FIRE SAFETY SITE PLAN - LADDER PAD1" = 30'-0" C H U N T H A L E J O N E S A R C H I T E C T S DATE: PROJECT: COLEMAN VILLAGE

CITY VENTURES
1400 COLEMAN AVE.

SANTA CLARA, CALIFORNIA 95050

11.10. 2025
317082
~ CITY VENTURES Building It Forward
TARRAR I UTILI TY ~ TRH TS
HUNT
HALE
JONES
C Collaborative
~ KIER+WRIGHT
tt
□
~ l--T,,J NORTH
'
' '
-1
1ST FLOOR 2ND FLOOR 3RD FLOOR 4TH FLOOR ROOF
9 -1 9
-1 9
-1
“44
-1 GARAGE UNIT - PLAN 4 9
-0 4
-0 0ƒ BALCONY BEDROOM TYP. EGRESS WINDIN 
-0 
-0 2
-0 4
-0 UNIT - PLAN 5
9 -1
5 -0 0ƒ 5
-0 4
-0 3RD FLOOR PLAN PLAN 4 & 5 2ND FLOOR PLAN PLAN 4 & 5 5 -0 
-0 2
-0 4
-0 5
-0 
-0 NOTE: PER CBC SECTION 1031.2, LADDER PADS ARE PROVIDED FOR EMERGENCY ESCAPE AND RESCUE OPENINGS IN R-2 OCCUPANCIES FOR BASEMENTS & SLEEPING ROOMS BELOW THE FOURTH STORY ABOVE GRADE PLANE. C H U N T H A L E J O N E S A R C H I T E C T S DATE: PROJECT: COLEMAN VILLAGE CITY VENTURES 1400 COLEMAN AVE. SANTA CLARA, CALIFORNIA 95050 11.10. 2025 31082 SCALE: FIRE SAFETY - LADDER PAD DIAGRAM FS-1.1 14 1 -0 r-"'T"T'T'l"'l"'T'T"l'--,l"""l"'"""'l"'"~r--"""11""---r---!l"T"ll"'---,~'--,l,--J, . - - ,r-,r--,r I fg CITY VENTURES Building It Forward TARRAR I UI ILIT'/ a. COHSULTRHIS 0 _ [ r ] l -------'-.- - \.- ·1--r--f I 1' ,r--,r ..... ---------,1,--J, I I! @ KIER+WRIGHT 1 2
4 6 3
7 7
2 3 1
7 6
7 1
2 6
4 3
1 1
2 6
7 3
STUCCO 1 STUCCO 2 VERTICAL SIDING 1 VERTICAL SIDING 2 BRICK VENEER 1 2 6
3 4
7 METAL RAILING/ FRONT DOOR
5 VERTICAL SIDING 3 STUCCO FINISH - 16/20 for Bldg B , D, E, F, G, J, K, L, M and N. Finish for Bldg A & H TBD VERTICAL SIDING - TruExterior (VERTICAL NICKEL GAP) BRICK VENEER - McNear Cotswold TRIM/ PARAPET CAP - SAME AS STUCCO/ SIDING COLOR WINDOWS - GREY VINYL GARAGE DOORS - FLUSH METAL ROLL UP

FRONT DOORS - FIBERGLASS W/ GLASS
LIGHT FIXTURE - VISUAL COMFORT & CO._ VEX 12 OUTDOOR WALL OR EQUAL NOTE: ALL MATERIAL ARE AS SPECIFIED OR EQUAL Scale:

Date:

Project Number: © HUNT HALE JONES ARCHITECTS COLEMAN VILLAGE 1/8" = 1'-0" C:\Users\Priya Arora\Documents\Revit Local Files\317082_SC2-Coleman [email protected] 11/11/2025 11:11:59 AM A1.0.1

BUILDING MATERIALS & FINISHES
11/10/2025
317082 CITY VENTURES
1400 COLEMAN AVE.

SANTA CLARA, CALIFORNIA 95050

LEFT ELEVATION FRONT ELEVATION

REAR ELEVATION RIGHT ELEVATION

ELEVATION LEGEND

MATERIAL SPECIFICATIONS
7 _J _J n
7 □
- □- ~
7 7 7
□ Il DI

CITY VENTURES
Building It Forward
~ KIER+WRIGHT
1 2
4 6 3
8 7
12 11
14 13
1 STUCCO 1 2 STUCCO 2 3 VERTICAL SIDING 1 4 VERTICAL SIDING 2 5 VERTICAL SIDING 3 6 BRICK VENEER 8 METAL RAILING

STANDING SEAM

METAL ROOF
15 12 TRIM/ PARAPET CAP
14 LIGHT FIXTURE
SW 7551 - GREEK VILLA OR EQUAL TBD FINISH (for buildings along Coleman Ave) Other buildings - 16/20 Finish SW 6256 - SERIOUS GRAY OR EQUAL TBD FINISH (for buildings along Coleman Ave) Other buildings - 16/20 Finish SW 6256 - SERIOUS GRAY OR EQUAL SW 0004 - ROSE BROCADE OR EQUAL SW 6262 - MYSTERIOUS MAUVE OR EQUAL McNear - COTSWOLD

BRONZE OR EQUAL BRONZE
SAME AS STUCCO/ SIDING COLOR VISUAL COMFORT & CO._ VEX 12 OUTDOOR WALL OR EQUAL 11 VINYL WINDOWS MILGARD SILVER OR EQUAL 7 ENTRY DOORS FLUSH METAL ROLL UP BRONZE 9 GARAGE DOORS FLUSH METAL ROLL UP WHITE 10 GARAGE DOORS FLUSH METAL ROLL UP BROWN
13 THIN BRICK SOLDIER McNear - COTSWOLD OR EQUAL NOTE: ALL MATERIAL ARE AS SPECIFIED OR EQUAL Scale:

Date:

Project Number: © HUNT HALE JONES ARCHITECTS COLEMAN VILLAGE As indicated C:\Users\Priya Arora\Documents\Revit Local Files\317082_SC2-Coleman [email protected] 11/11/2025 11:12:27 AM A1.0.2

MATERIALS COLOR BOARD
11/10/2025
317082 CITY VENTURES
1400 COLEMAN AVE.

SANTA CLARA, CALIFORNIA 95050
BLDG A _ FRONT ELEVATION ALONG COLEMAN AVE
□ □ □ □ □ □
I
□□□
□ □ □ □ □ □
'
□ □ □

CITY VENTURES
Building It Forward
TARRAR

UTILITY WJ CO NSULTRHTS
HUNT HALE Collaborat,ve C
JONES ~ KIER+WRIGHT
1ST FLOOR
0' - 0" 2ND FLOOR
10' - 4" 3RD FLOOR
20' - 8" 4TH FLOOR
31' - 0" ROOF
44' - 1" MAX. HEIGHT
49'- 6" 9' - 1" 9' - 1" 9' - 1" 9' - 1" 5' - 5" 44' - 1"49' - 6" 1ST FLOOR
0' - 0" 2ND FLOOR
10' - 4" 3RD FLOOR
20' - 8" 4TH FLOOR
31' - 0" ROOF
44' - 1" MAX. HEIGHT
49'- 6" 9' - 1" 9' - 1" 9' - 1" 9' - 1" 44' - 1" 5' - 5" 1ST FLOOR
0' - 0" 2ND FLOOR
10' - 4" 3RD FLOOR
20' - 8" 4TH FLOOR
31' - 0" ROOF
44' - 1" MAX. HEIGHT
49'- 6" 9' - 1" 9' - 1" 9' - 1" 9' - 1" 5' - 5" 44' - 1"49' - 6" 1ST FLOOR
0' - 0" 2ND FLOOR
10' - 4" 3RD FLOOR
20' - 8" 4TH FLOOR
31' - 0" ROOF
44' - 1" MAX. HEIGHT
49'- 6" 9' - 1" 9' - 1" 9' - 1" 9' - 1" 5' - 5" 44' - 1" Scale:

Date:

Project Number: © HUNT HALE JONES ARCHITECTS COLEMAN VILLAGE 1/8" = 1'-0" C:\Users\Priya Arora\Documents\Revit Local Files\317082_SC2-Coleman [email protected] 11/10/2025 12:21:51 PM A1.2.1
CONCEPTUAL ELEVATIONS_8 PLEX
11/10/2025
317082 CITY VENTURES
1400 COLEMAN AVE.

SANTA CLARA, CALIFORNIA 95050

LEFT ELEVATION FRONT ELEVATION

RIGHT ELEVATION REAR ELEVATION
---------- - - - - - - - - -----'le-----¼
, ··n111 l,, ~
------------------------------------'sc
'1 i'
- - - - ----Hlltlllt+t++++tlllltl -------------- ----- ------ --'< lU lU I -----, I I -----, I
w fill
=-rr
n 1 '
n 1 □ □---
= ~ ·EiH:R:A~ '

CITY VENTURES
Building It Forward
~ KIER+WRIGHT
1ST FLOOR
0' - 0" 2ND FLOOR
10' - 4" 3RD FLOOR
20' - 8" 4TH FLOOR
31' - 0" ROOF
44' - 1" MAX. HEIGHT
49'-6" 9' - 1" 9' - 1" 9' - 1" 9' - 1" 5' - 5" 44' - 1" 1ST FLOOR
0' - 0" 2ND FLOOR
10' - 4" 3RD FLOOR
20' - 8" 4TH FLOOR
31' - 0" ROOF
44' - 1" MAX. HEIGHT
49'- 6" 44' - 1" 5' - 5" 9' - 1" 9' - 1" 9' - 1" 9' - 1" 49' - 6" 1ST FLOOR 0' - 0" 2ND FLOOR
10' - 4" 3RD FLOOR
20' - 8" 4TH FLOOR
31' - 0" ROOF
44' - 1" MAX. HEIGHT
49'- 6" 9' - 1" 9' - 1" 9' - 1" 9' - 1" 5' - 5" 44' - 1" 1ST FLOOR
0' - 0" 2ND FLOOR
10' - 4" 3RD FLOOR
20' - 8" 4TH FLOOR
31' - 0" ROOF
44' - 1" MAX. HEIGHT
49'- 6" 9' - 1" 9' - 1" 9' - 1" 9' - 1" 5' - 5" 44' - 1" Scale:

Date:

Project Number: © HUNT HALE JONES ARCHITECTS COLEMAN VILLAGE 1/8" = 1'-0" C:\Users\Priya Arora\Documents\Revit Local Files\317082_SC2-Coleman [email protected] 11/10/2025 12:25:27 PM A1.3.1
CONCEPTUAL ELEVATIONS_10 PLEX
11/10/2025
317082 CITY VENTURES
1400 COLEMAN AVE.

SANTA CLARA, CALIFORNIA 95050

LEFT ELEVATION FRONT ELEVATION

REAR ELEVATION RIGHT ELEVATION
IIJ DI
lU lJl
' ----'s-----
----'< ----
----'s-----
_,,__ - -

CITY VENTURES
Building It Forward
' ' $ I I 11111 1
\----------/
----- ------------------i---------
1 I I I I I
[I] ----
= Il ----
'
~ KIER+WRIGHT
1ST FLOOR
0' - 0" 2ND FLOOR
10' - 4" 3RD FLOOR
20' - 8" 4TH FLOOR
31' - 0" ROOF
44' - 1" MAX. HEIGHT
49'-6" 9' - 1" 9' - 1" 9' - 1" 4' - 0" 9' - 1" 5' - 5" 44' - 1"49' - 6" 1ST FLOOR 0' - 0" 2ND FLOOR
10' - 4" 3RD FLOOR
20' - 8" 4TH FLOOR
31' - 0" ROOF
44' - 1" MAX. HEIGHT
49'-6" 5' - 5" 44' - 1"49' - 6" 9' - 1" 9' - 1" 9' - 1" 4' - 0" 9' - 1" 1ST FLOOR
0' - 0" 2ND FLOOR
10' - 4" 3RD FLOOR
20' - 8" 4TH FLOOR
31' - 0" ROOF
44' - 1" MAX. HEIGHT
49'-6" 9' - 1" 5' - 5" 44' - 1"49' - 6" 4' - 0" 9' - 1" 9' - 1" 9' - 1" 1ST FLOOR 0' - 0" 2ND FLOOR
10' - 4" 3RD FLOOR
20' - 8" 4TH FLOOR
31' - 0" ROOF
44' - 1" MAX. HEIGHT
49'-6" 9' - 1" 9' - 1" 4' - 0" 44' - 1" 5' - 5" 49' - 6" 9' - 1" 9' - 1" Scale:

Date:

Project Number: © HUNT HALE JONES ARCHITECTS COLEMAN VILLAGE 1/8" = 1'-0" C:\Users\Priya Arora\Documents\Revit Local Files\317082_SC2-Coleman [email protected] 11/10/2025 12:28:52 PM A1.4.1
CONCEPTUAL ELEATIONS_10 PLEX W STUDIO
11/10/2025
317082 CITY VENTURES
1400 COLEMAN AVE.

SANTA CLARA, CALIFORNIA 95050

BLDG K - FRONT

BLDG K - REAR ELEVATION

BLDG K - SIDE ELEVATION

BLDG K - STREET ELEVATION
---------¾
-------- -- - -~-
- - -
1 I] I - ~ ~ lmnr ~~ ~~1111 11r= - _____,,__
' [ [ lu l ' '
~
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - ----'1.--------'s-----------l'w [I] 0 0 '

CITY VENTURES
Building It Forward
~ KIER+WRIGHT
1ST FLOOR
0' - 0" 2ND FLOOR
10' - 4" 3RD FLOOR
20' - 8" 4TH FLOOR
31' - 0" ROOF
44' - 1" MAX. HEIGHT
49'- 6" 9' - 1" 9' - 1" 9' - 1" 5' - 5" 4' - 0" 9' - 1" 44' - 1" 1ST FLOOR 0' - 0" 2ND FLOOR
10' - 4" 3RD FLOOR
20' - 8" 4TH FLOOR
31' - 0" ROOF
44' - 1" MAX. HEIGHT
49'- 6" 9' - 1" 9' - 1" 9' - 1" 9' - 1" 4' - 0" 5' - 5" 44' - 1"49' - 6" 1ST FLOOR
0' - 0" 2ND FLOOR
10' - 4" 3RD FLOOR
20' - 8" 4TH FLOOR
31' - 0" ROOF
44' - 1" MAX. HEIGHT
49'- 6" 9' - 1" 9' - 1" 9' - 1" 9' - 1" 4' - 0" 5' - 5" 44' - 1" 1ST FLOOR 0' - 0" 2ND FLOOR
10' - 4" 3RD FLOOR
20' - 8" 4TH FLOOR
31' - 0" ROOF
44' - 1" MAX. HEIGHT
49'- 6" 9' - 1" 9' - 1" 9' - 1" 4' - 0" 9' - 1" 5' - 5" 44' - 1"49' - 6" Scale:

Date:

Project Number: © HUNT HALE JONES ARCHITECTS COLEMAN VILLAGE 1/8" = 1'-0" C:\Users\Priya Arora\Documents\Revit Local Files\317082_SC2-Coleman [email protected] 11/10/2025 12:31:00 PM A1.5.1
CONCEPTUAL ELEVATIONS_14 PLEX
11/10/2025
317082 CITY VENTURES
1400 COLEMAN AVE.

SANTA CLARA, CALIFORNIA 95050

BLDG G - FRONT

BLDG G - LEFT BLDG G - REAR

BLDG G - RIGHT
-
1111
l==i
----
II I] ----
n:n ---- --'<- ---- ----
CTI]
-11~ ~~~~~~~¥'° -' - - - -
' ;
------'s-----
------'s-----
------'s-----
------'s-----
'

CITY VENTURES
Building It Forward
TARRAR
-------------------------------------->.------JC
1,,1
-------------- -, - --------- ------- - - - - -------"-___,_______.c □
HUNT HALE Collaborative C
I,'
---------- ' -------'-c ---
J J
□
D J
UTILITY L!lJ CO HSULTRHTS __ • NES ~ KIER+WRIGHT
1ST FLOOR
0' - 0" 2ND FLOOR
10' - 4" 3RD FLOOR
20' - 8" 4TH FLOOR
31' - 0" ROOF
44' - 1" MAX. HEIGHT
49'- 6" 9' - 1" 9' - 1" 9' - 1" 4' - 0" 9' - 1" 44' - 1" 1ST FLOOR 0' - 0" 2ND FLOOR
10' - 4" 3RD FLOOR
20' - 8" 4TH FLOOR
31' - 0" ROOF
44' - 1" MAX. HEIGHT
49'- 6" 9' - 1" 9' - 1" 9' - 1" 9' - 1" 4' - 0" 44' - 1" 5' - 5" 49' - 6" 1ST FLOOR
0' - 0" 2ND FLOOR
10' - 4" 3RD FLOOR
20' - 8" 4TH FLOOR
31' - 0" ROOF
44' - 1" MAX. HEIGHT
49'- 6" 9' - 1" 9' - 1" 9' - 1" 4' - 0" 9' - 1" 5' - 5" 44' - 1"49' - 6" 1ST FLOOR 0' - 0" 2ND FLOOR
10' - 4" 3RD FLOOR
20' - 8" 4TH FLOOR
31' - 0" ROOF
44' - 1" MAX. HEIGHT
49'- 6" 9' - 1" 9' - 1" 9' - 1" 5' - 5" 4' - 0" 9' - 1" 44' - 1"49' - 6" Scale:

Date:

Project Number: © HUNT HALE JONES ARCHITECTS COLEMAN VILLAGE 1/8" = 1'-0" C:\Users\Priya Arora\Documents\Revit Local Files\317082_SC2-Coleman [email protected] 11/10/2025 12:31:59 PM A1.6.1
CONCEPTUAL ELEVATIONS_18 PLEX
11/10/2025
317082 CITY VENTURES
1400 COLEMAN AVE.

SANTA CLARA, CALIFORNIA 95050

BLDG M - FRONT ELEVATION

BLDG M - REAR ELEVATION
BLDG M - LEFT ELEVATION1

BLDG M - RIGHT ELEVATION
' ~
---- - -¾->,-
' [I]
' - -¾- -

JI ---',-- -
' □
- --- - - - - ----------~-----N
illJl ------- ----
III]
~ _j~~ ·~ ~~ IY---- ~
.$jtj( ' ., ·~:1f,7 • ,": - ··., 1·~1'-'f< -.f ~". ''¥"", ' '

CITY VENTURES
Building It Forward
___________________________________ --------,.,.
------,
[LI LI LI tn
II [I] lOil
',
--- ------- -
IDD L
LJ
LJ
LI LI
[IJ I
□ □□ I
__________________________________ _______,,__,_______----N II
II
~ KIER+WRIGHT
□
lJl
-n-n- -
□ 1
LI □ I
1ST FLOOR
0' - 0" 2ND FLOOR
10' - 4" 3RD FLOOR
20' - 8" 4TH FLOOR
31' - 0" ROOF
44' - 1" MAX. HEIGHT
49'- 6" 9' - 1" 9' - 1" 9' - 1" 4' - 0" 9' - 1" 5' - 5" 44' - 1"49' - 6" 1ST FLOOR 0' - 0" 2ND FLOOR
10' - 4" 3RD FLOOR
20' - 8" 4TH FLOOR
31' - 0" ROOF
44' - 1" MAX. HEIGHT
49'- 6" 9' - 1" 9' - 1" 9' - 1" 4' - 0" 9' - 1" 5' - 5" 44' - 1"49' - 6" 1ST FLOOR
0' - 0" 2ND FLOOR
10' - 4" 3RD FLOOR
20' - 8" 4TH FLOOR
31' - 0" ROOF
44' - 1" MAX. HEIGHT
49'- 6" 9' - 1" 9' - 1" 9' - 1" 4' - 0" 9' - 1" 5' - 5" 44' - 1"49' - 6" 1ST FLOOR 0' - 0" 2ND FLOOR
10' - 4" 3RD FLOOR
20' - 8" 4TH FLOOR
31' - 0" ROOF
44' - 1" MAX. HEIGHT
49'- 6" 9' - 1" 9' - 1" 9' - 1" 9' - 1" 4' - 0" 44' - 1" 5' - 5" 49' - 6" Scale:

Date:

Project Number: © HUNT HALE JONES ARCHITECTS COLEMAN VILLAGE 1/8" = 1'-0" C:\Users\Priya Arora\Documents\Revit Local Files\317082_SC2-Coleman [email protected] 11/10/2025 12:33:01 PM A1.7.1
CONCEPTUAL ELEVATIONS_20 PLEX
11/10/2025
317082 CITY VENTURES
1400 COLEMAN AVE.

SANTA CLARA, CALIFORNIA 95050
BLDG L - FRONT ELEVATION 2

BLDG L - FRONT ELEVATION

BLDG L - SIDE ELEVATION

BLDG L - STREET SIDE ELEVATION
- - - - ------------ - - - - ------,s-------~~
- ~
- ----- II~ I ----~
1 U LI lJ - lU lU Lill ILDJI _OJI
I m rn :rn 1 nm
rn-n- n--=1 ~
n n
11111

DJ - ''' --
-----------------------'k--------'<-____,.._ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -------'k------'--------"' 1 ,111, I,

I ---- ---
Dl Dl
I
D DJ 0
-· J[__ i 1!1!1! " [_ -

CITY VENTURES
Building It Forward
~ KIER+WRIGHT
3' - 0" 88' - 10"
53' - 6" 1' - 6"
22' - 2" 2" 22' - 0" 2" 22' - 0" 2" 22' - 2"
PLAN 5 (END)PLAN 5 PLAN 4 PLAN 4 (END)PLAN 4 PLAN 5 PLAN 4 PLAN 5 Scale:

Date:

Project Number:
© HUNT HALE JONES ARCHITECTS

COLEMAN VILLAGE
1/8" = 1'-0"
Z:\317082_Santa_Clara_2\Dwgs\DR-SD\Dwgs\~Superceded\317082_SC2-Coleman Village-SD-250916_SUBMITTED.rvt 10/23/2025 11:18:57 AM A2.2.1
CONCEPTUAL 1ST FLOOR PLAN_8 PLEX
11/10/2025
317082

CITY VENTURES
1400 COLEMAN AVE.

SANTA CLARA, CALIFORNIA 95050
1ST FLOOR PLAN

BLDG H (BLDG J - REVERSED)

CITY VENTURES
Building It Forward
TARRAR
UTILITY lilJ CO HSU LTAHTS
HUNT HALE Collaborat,ve C
JONES ~ KIER+WRIGHT
REF. P
DW
REF. P
REF.

DW
P
DW
REF. P
DW
88' - 10"
55' - 0"
22' - 2" 2" 22' - 0" 2" 22' - 0" 2" 22' - 2"
PLAN 5
(END)
PLAN 4
PLAN 5
PLAN 4 (END)PLAN 4
PLAN 5
PLAN 4
PLAN 5
Scale:

Date:

Project Number:
© HUNT HALE JONES ARCHITECTS

COLEMAN VILLAGE
1/8" = 1'-0"
Z:\317082_Santa_Clara_2\Dwgs\DR-SD\Dwgs\~Superceded\317082_SC2-Coleman Village-SD-250916_SUBMITTED.rvt 10/23/2025 11:19:58 AM A2.2.2
CONCEPTUAL 2ND FLOOR PLAN_8 PLEX
11/10/2025
317082

CITY VENTURES
1400 COLEMAN AVE.

SANTA CLARA, CALIFORNIA 95050
2ND FLOOR PLAN

BLDG H (BLDG J - REVERSED)

CITY VENTURES
Building It Forward
TARRAR
UTILITY lilJ CO HSU LTAHTS
HUNT HALE Collaborat,ve C
JONES ~ KIER+WRIGHT
REF. P
DW
REF. P
REF.

DW
P
DW
REF. P
DW
88' - 10"
55' - 0"
22' - 2" 2" 22' - 0" 2" 22' - 0" 2" 22' - 2"
(END)
PLAN 5
(END)
PLAN 4
PLAN 5
PLAN 4
(END)
PLAN 4
(END)
PLAN 5
PLAN 4
PLAN 5
Scale:

Date:

Project Number:
© HUNT HALE JONES ARCHITECTS

COLEMAN VILLAGE
1/8" = 1'-0"
Z:\317082_Santa_Clara_2\Dwgs\DR-SD\Dwgs\~Superceded\317082_SC2-Coleman Village-SD-250916_SUBMITTED.rvt 10/23/2025 11:21:15 AM A2.2.3
CONCEPTUAL 3RD FLOOR PLAN_8 PLEX
11/10/2025
317082

CITY VENTURES
1400 COLEMAN AVE.

SANTA CLARA, CALIFORNIA 95050
3RD FLOOR PLAN

BLDG H (BLDG J - REVERSED)
/

CITY VENTURES
Building It Forward
TARRAR
UTILITY lilJ CO HSU LTAHTS
HUNT HALE Collaborat,ve C
JONES ~ KIER+WRIGHT
88' - 10"
49' - 6"
22' - 2" 2" 22' - 0" 2" 22' - 0" 2" 22' - 2"
@ BLDG J & H ONLY
2' - 0"
(END)
PLAN 5 PLAN 5
(END)
PLAN 5 PLAN 5
Scale:

Date:

Project Number:
© HUNT HALE JONES ARCHITECTS

COLEMAN VILLAGE
1/8" = 1'-0"
Z:\317082_Santa_Clara_2\Dwgs\DR-SD\Dwgs\~Superceded\317082_SC2-Coleman Village-SD-250916_SUBMITTED.rvt 10/23/2025 11:22:59 AM A2.2.4
CONCEPTUAL 4TH FLOOR PLAN_8 PLEX
11/10/2025
317082

CITY VENTURES
1400 COLEMAN AVE.

SANTA CLARA, CALIFORNIA 95050
4TH FLOOR PLAN

BLDG H (BLDG J - REVERSED)
/
)( / /

CITY VENTURES
Building It Forward
TARRAR
UTILITY lilJ CO HSU LTAHTS ~ KIER+WRIGHT
TYP. SOLAR READY ZONE
TYP. A/C UNITS
49' - 6"
2' - 0"
Scale:

Date:

Project Number:
© HUNT HALE JONES ARCHITECTS

COLEMAN VILLAGE
1/8" = 1'-0"
Z:\317082_Santa_Clara_2\Dwgs\DR-SD\Dwgs\~Superceded\317082_SC2-Coleman Village-SD-250916_SUBMITTED.rvt 10/23/2025 11:38:14 AM A2.2.5
CONCEPTUAL ROOF PLAN_8 PLEX
11/10/2025
317082

CITY VENTURES
1400 COLEMAN AVE.

SANTA CLARA, CALIFORNIA 95050

ROOF PLAN

BLDG H (BLDG J - REVERSED)

CITY VENTURES
Building It Forward
TARRAR
UTILITY lilJ CO HSU LTAHTS
HUNT HALE Collaborat,ve C
JONES ~ KIER+WRIGHT
UP 22' - 0" 2" 22' - 0" 2" 22' - 0" 2"
PLAN 5 (END)PLAN 4 PLAN 5 PLAN 4 PLAN 5 PLAN 4 PLAN 5 PLAN 5 PLAN 4 PLAN 4 PLAN 5 (ADA)
(@ BLDG A, B, D, E & F)
3' - 6"
PLAN 4 (AIP/ADA)
(@ BLDG A, B, D, E & F)
Scale:

Date:

Project Number:
© HUNT HALE JONES ARCHITECTS

COLEMAN VILLAGE
1/8" = 1'-0"
C:\Users\Priya Arora\Documents\Revit Local Files\317082_SC2-Coleman [email protected] 10/23/2025 12:00:26 PM A2.3.1
CONCEPTUAL 1ST FLOOR PLAN_10 PLEX
11/10/2025
317082

CITY VENTURES
1400 COLEMAN AVE.

SANTA CLARA, CALIFORNIA 95050
1ST FLOOR PLAN

BLDG A (BLDG D, N - SIM) / (BLDG B, E - REVERSED)
.r ,< ,<
-·-·-·-·-·-·-·-·-·-·-·- •- ·-•-·-·-·-·-·-·-·-·-·-•-·-·-·-·-·-·-·-·-·-·_J

CITY VENTURES
Building It Forward
TARRAR
UTILITY LliJ CO HSU LTAHTS
HUNT HALE Collaborat,ve C
JONES ~ KIER+WRIGHT
REF. P
DW
REF. P
DW
REF. P
DW
REF. P
DW
REF. P
DW
111' - 0"
55' - 0"
22' - 2" 2" 22' - 0" 2" 22' - 0" 2" 22' - 0" 2" 22' - 2" PLAN 5
(END)
PLAN 4 (END)PLAN 4
PLAN 5
PLAN 4
PLAN 5
PLAN 4 PLAN 4
PLAN 5 PLAN 5
Scale:

Date:

Project Number:
© HUNT HALE JONES ARCHITECTS

COLEMAN VILLAGE
1/8" = 1'-0"
Z:\317082_Santa_Clara_2\Dwgs\DR-SD\Dwgs\~Superceded\317082_SC2-Coleman Village-SD-250916_SUBMITTED.rvt 10/23/2025 11:43:30 AM A2.3.2
CONCEPTUAL 2ND FLOOR PLAN_10 PLEX
11/10/2025
317082

CITY VENTURES
1400 COLEMAN AVE.

SANTA CLARA, CALIFORNIA 95050
2ND FLOOR PLAN

BLDG A (BLDG D, N - SIM) / (BLDG B, E - REVERSED)

CITY VENTURES
Building It Forward
TARRAR
UTILITY lilJ CO HSU LTAHTS
HUNT HALE Collaborat,ve C
JONES ~ KIER+WRIGHT
REF. P
DW
REF. P
DW
REF. P
DW
REF. P
DW
REF. P
DW
111' - 0"
49' - 6"
22' - 2" 2" 22' - 0" 2" 22' - 0" 2" 22' - 0" 2" 22' - 2" (END)
PLAN 5
(END)
PLAN 4 (END)PLAN 4
(END)
PLAN 5
PLAN 4
PLAN 5
PLAN 4 PLAN 4
PLAN 5 PLAN 5
Scale:

Date:

Project Number:
© HUNT HALE JONES ARCHITECTS

COLEMAN VILLAGE
1/8" = 1'-0"
Z:\317082_Santa_Clara_2\Dwgs\DR-SD\Dwgs\~Superceded\317082_SC2-Coleman Village-SD-250916_SUBMITTED.rvt 10/23/2025 12:03:24 PM A2.3.3
CONCEPTUAL 3RD FLOOR PLAN_10 PLEX
11/10/2025
317082

CITY VENTURES
1400 COLEMAN AVE.

SANTA CLARA, CALIFORNIA 95050
3RD FLOOR PLAN

BLDG A (BLDG D, N - SIM) / (BLDG B, E - REVERSED)
/

CITY VENTURES
Building It Forward
TARRAR
UTILITY lilJ CO HSU LTAHTS
HUNT HALE Collaborat,ve C
JONES ~ KIER+WRIGHT
111' - 0"
49' - 6"
22' - 2" 2" 22' - 0" 2" 22' - 0" 2" 22' - 0" 2" 22' - 2" 14' - 4"
(END)
PLAN 5 (END)PLAN 5 PLAN 5 PLAN 5 PLAN 5
Scale:

Date:

Project Number:
© HUNT HALE JONES ARCHITECTS

COLEMAN VILLAGE
1/8" = 1'-0"
Z:\317082_Santa_Clara_2\Dwgs\DR-SD\Dwgs\~Superceded\317082_SC2-Coleman Village-SD-250916_SUBMITTED.rvt 10/23/2025 12:04:20 PM A2.3.4
CONCEPTUAL 4TH FLOOR PLAN_10 PLEX
11/10/2025
317082

CITY VENTURES
1400 COLEMAN AVE.

SANTA CLARA, CALIFORNIA 95050
4TH FLOOR PLAN

BLDG A (BLDG D, N - SIM) / (BLDG B, E - REVERSED)

CITY VENTURES
Building It Forward
TARRAR
UTILITY lilJ CO HSU LTAHTS ~ KIER+WRIGHT
TYP. SOLAR READY ZONE
TYP. A/C UNITS
Scale:

Date:

Project Number:
© HUNT HALE JONES ARCHITECTS

COLEMAN VILLAGE
1/8" = 1'-0"
Z:\317082_Santa_Clara_2\Dwgs\DR-SD\Dwgs\~Superceded\317082_SC2-Coleman Village-SD-250916_SUBMITTED.rvt 10/23/2025 12:05:16 PM A2.3.5
CONCEPTUAL ROOF PLAN_10 PLEX
11/10/2025
317082

CITY VENTURES
1400 COLEMAN AVE.

SANTA CLARA, CALIFORNIA 95050

ROOF PLAN

BLDG A (BLDG D, N - SIM) / (BLDG B, E - REVERSED)
Q

CITY VENTURES
Building It Forward
TARRAR
UTILITY lilJ CO HSU LTAHTS ~ KIER+WRIGHT
1ST FLOOR PLAN
BLDG. _AT BUILDINGS G THROUGH K - SEE SITE PLAN - PLANS 6,7 & 8 2,184 SQ. FT. 2ND FLOOR PLAN
BLDG. C_AT BUILDINGS C-D-E-F - SEE SITE PLAN 2,356 SQ. FT.

METER
STACK

TESTBLOCK & METER HOUSE
PANEL
SPACE
FOR LV

PULL MAIN
METER
STACK
85'-8" 4'-0" 22'-6"
85'-8" 31'-6" 1'-0"
21'-0" 32'-2" 32'-2" 2" 2"
21'-0" 2" 32'-2" 2" 32'-2"
85'-8" 27'-6"
85'-8" 27'-6"
21'-0" 2" 32'-2" 2" 32'-2"
21'-0" 2" 16'-0" 2" 16'-0" 2" 16'-0" 2" 16'-0" 1'-0" 27'-6" 30'-6" TOTAL SQ. FT. 9,251 SQ. FT. 3RD FLOOR PLAN
BLDG. C - PLANS 6 &7 2,356 SQ. FT. 27'-6"
4TH FLOOR PLAN
BLDG. K - PLAN 8 (8A AND 8B) 2,356 SQ. FT.
85'-8" 27'-6"
85'-8" 27'-6"
21'-0" 2" 32'-2" 2" 32'-2"
21'-0" 2" 16'-0" 2" 16'-0" 2" 16'-0" 2" 16'-0"
85'-8" 27'-6"
85'-8" 27'-6"
21'-0" 2" 32'-2" 2" 32'-2"
21'-0" 2" 16'-0" 2" 16'-0" 2" 16'-0" 2" 16'-0"
C H U N T H A L E J O N E S A R C H I T E C T S DATE: PROJECT: COLEMAN VILLAGE

CITY VENTURES
1400 COLEMAN AVE.

SANTA CLARA, CALIFORNIA 95050

11.10. 2025
317082 SCALE: CONCEPTUAL 1ST-4TH BP_10 PLEX W-STUDIO
1/8" = 1'-0"
~1 1~ ~
~ CITY VENTURES Building It Forward
TARRAR I UTILI TY ~ TRH TS
HUNT
HALE
JONES
' ' '
C Collaborative
~ KIER+WRIGHT
' ' '

ROOF PLAN
BLDG. K - PLANS 1 & 2
85'-8" 27'-6"

ROOF BELOW

SEE SOLAR PANEL PLAN FOR EXACT

LOCATION

CONCEPTUAL HVAC UNIT

LOCATION
C H U N T H A L E J O N E S A R C H I T E C T S DATE: PROJECT: COLEMAN VILLAGE

CITY VENTURES
1400 COLEMAN AVE.

SANTA CLARA, CALIFORNIA 95050

11.10. 2025
317082 SCALE: CONCEPTUAL RP_10 PLEX W-STUDIO
1/8" = 1'-0"
~ CITY VENTURES Building It Forward HUNT
HALE TARRAR I UTILI TY ~ TRHTS ---......
lt)l\l~C::

C Collaborative
~ KIER+WRIGHT
0 0
00 0
00 PLAN 4
GARAGE
WH WH
ENTRY
UP PDR.

PLAN 4
GARAGE
WH WH
ENTRY
UP PDR.
112'-4" 1'-6" 53'-6"
1ST FLOOR PLAN
BLDGS. G _14-PLEX - PLANS 1,2, 4,& 5 5,960 SQ. FT.
23'-6" 2
1 2
" 10'-11" 2" 10'-11" 2" 10'-11" 2" 10'-11" 2" 10'-11" 2" 10'-11" 2" 10'-11" 2" 11'-1" 1'-0" 1'-6" 4'-0" 4'-0" 52'-4" 3'-8
1 2
" 1'-0" 20'-0" 2" 32'-2" 4'-0" 112'-4" 23'-6" 2" 22'-0" 2" 22'-0" 3" 22'-0" 2" 22'-2" 24,164 SQ. FT. TOTAL 112'-4" 1'-6" 62'-1
1 2
"
PARTIAL 1ST FLOOR PLAN
BLDGS. F _14-PLEX (AIP/ADA) - PLANS 1,2, 4,& 5 6,038 SQ. FT. 23'-6" 10'-11" 2" 10'-11" 2" 10'-11" 2" 10'-11" 2" 10'-11" 2" 10'-11" 2" 11'-1" 1'-6" 4'-0" 4'-0" 52'-4" 3'-7
1 2
" 1'-0" 20'-0" 2" 32'-2" 4'-0" 112'-4" 23'-6" 22'-0" 2" 22'-2" 24,242 SQ. FT. TOTAL PLAN 4
GARAGE
WH WH
ENTRY
UP PDR.

PLAN 4
GARAGE
WH
ENTRY
UP PDR.
2" 10'-11" 2"
2" 22'-0" 2" 22'-0" 2"
C H U N T H A L E J O N E S A R C H I T E C T S DATE: PROJECT: COLEMAN VILLAGE

CITY VENTURES
1400 COLEMAN AVE.

SANTA CLARA, CALIFORNIA 95050

11.10. 2025
317082 SCALE: CONCEPTUAL 1ST BP_14 PLEX
1/8" = 1'-0"
~ CITY VENTURES Building It Forward
TARRAR I UTILI TY ~ TRH TS
HUNT
HALE
JONES
C Collaborative
' ' ' ------+--t--¥--i-r--,"---1----,----, r-- rrr-------:-f1r-- 1 -r- m----rrrt-- 11 .. =-==--.:,..,__---,-i ' ~ KIER+WRIGHT
2ND FLOOR PLAN
6,190 SQ. FT. - PLANS 1,2, 4,& 5 BLDGS. F & G _14-PLEX
116'-51
2 " 57'-6"
27'-6" 2" 22'-0" 2" 22'-0" 2" 22'-0" 2" 22'-312
" 1'-0" 1'-6" 2'-6" 53'-4" 4'-2" 21'-0" 2" 16'-0"
116'-2" 27'-6" 2" 22'-0" 2" 22'-0" 2" 22'-0" 2" 22'-0" 2" 16'-0" C H U N T H A L E J O N E S A R C H I T E C T S DATE: PROJECT: COLEMAN VILLAGE

CITY VENTURES
1400 COLEMAN AVE.

SANTA CLARA, CALIFORNIA 95050

11.10. 2025
317082 SCALE: CONCEPTUAL 2ND BP_14 PLEX
1/8" = 1'-0"
CITY VENTURES Building It Forward
TARRAR I UTIU Tv :: coHSULTRH TS --
HUNT
HALE
lill\l f=~
C L
Collaborative
~ KIER+WRIGHT
3RD FLOOR PLAN
BLDG. M _12-PLEX - PLANS 1,2, 4,& 5 6,100 SQ. FT.
116'-51
2 " 57'-6"
27'-6" 2" 22'-0" 2" 22'-0" 2" 22'-0" 2" 22'-312
" 1'-0" 1'-6" 2'-6" 53'-4" 4'-2" 21'-0" 2" 16'-0"
116'-2" 27'-6" 2" 22'-0" 2" 22'-0" 2" 22'-0" 2" 22'-0" 2" 16'-0" C H U N T H A L E J O N E S A R C H I T E C T S DATE: PROJECT: COLEMAN VILLAGE

CITY VENTURES
1400 COLEMAN AVE.

SANTA CLARA, CALIFORNIA 95050

11.10. 2025
317082 SCALE: CONCEPTUAL 3RD BP_14 PLEX
1/8" = 1'-0"
r 6-=~~~_,,,,,,,,,,..r=.....,_,,,,,==d-~~~==--41' --"--'---- .. ~~-...................... [_, [:;

CITY VENTURES
Building It Forward II ~~~ I ~ KIER+WRIGHT
4TH FLOOR PLAN
BLDGS. F & G _14-PLEX PLANS 1,2, 4 & 5 5,914 SQ. FT.
116'-51
2 " 52'-0"
27'-6" 2" 22'-0" 2" 22'-0" 2" 22'-0" 2" 22'-312
" 1'-0" 1'-6" 2'-6" 53'-4" 4'-2" 21'-0" 2" 16'-0"
116'-51
2 " 22'-31
2 " 27'-6" 2" 22'-0" 2" 22'-0" 2" 22'-0" 2" 2" 16'-0"
C H U N T H A L E J O N E S A R C H I T E C T S DATE: PROJECT: COLEMAN VILLAGE

CITY VENTURES
1400 COLEMAN AVE.

SANTA CLARA, CALIFORNIA 95050

11.10. 2025
317082 SCALE: CONCEPTUAL 4TH BP_14 PLEX
1/8" = 1'-0"
CITY VENTURES Building It Forward
TARRAR I UTIU Tv :: coHSULTRH TS --
HUNT
HALE
lill\l f=~
r
n
J\.~~ l !/ ~
~-----"'i'i'i"'
r -:;1_cci
\
l
~
•1 1··
~ u I\JL CJ ~[01\ JL - - LI ~
j j
C L
Collaborative
~ KIER+ WRIGHT

ROOF PLAN
BLDG. F (BLDG G REVERSED) PLANS 1,2 & 4
116'-51
2 " 52'-0"

ROOFS BELOW

SEE SOLAR PANEL PLAN FOR EXACT

LOCATION

CONCEPTUAL HVAC UNIT

LOCATION
C H U N T H A L E J O N E S A R C H I T E C T S DATE: PROJECT: COLEMAN VILLAGE

CITY VENTURES
1400 COLEMAN AVE.

SANTA CLARA, CALIFORNIA 95050

11.10. 2025
317082 SCALE: CONCEPTUAL RP_14 PLEX
1/8" = 1'-0"
~ CITY VENTURES Building It Forward
TARRAR I UTILI TY ~ TRH TS
HUNT
HALE
JONES
0 C
DD
0 Collaborative
~ KIER+WRIGHT
000
00 1ST FLOOR PLAN
BLDG. M _18-PLEX - PLANS 1 & 2 4096 SQ. FT. 17,324 SQ. FT. TOTAL HOUSE PANEL TESTBLOCK & METER METER STACK SPACE FOR LV MAIN PULL METER STACK 100'-8" 23'-6" 2" 21'-0" 2" 16'-0" 2" 23'-6" 52'-4"
100'-8" 52'-4"
23'-6" 2" 21'-0" 2" 16'-0" 2" 16'-0" 2" 23'-6" 20'-0" 2" 16'-0" 2" 16'-0" 20'-0" 2" 16'-0" 2" 16'-0" 4'-0" 4'-0" 1'-0" 1'-0"
2" 16'-0"
4'-0" 4'-0"
C H U N T H A L E J O N E S A R C H I T E C T S DATE: PROJECT: COLEMAN VILLAGE

CITY VENTURES
1400 COLEMAN AVE.

SANTA CLARA, CALIFORNIA 95050

11.10. 2025
317082 SCALE: CONCEPTUAL 1ST BP_18 PLEX
1/8" = 1'-0"
~ CITY VENTURES Building It Forward
TARRAR I UTILI TY ~ TRH TS
HUNT
HALE
. 1()1\lf=~
---
' --------',--
C Collaborative
~ KIER+WRIGHT
2ND FLOOR PLAN
BLDG. M _18-PLEX - PLANS 1 & 2 4409 SQ. FT.
108'-8" 27'-6" 2" 21'-0" 2" 32'-2" 2" 27'-6" 53'-4"
108'-8" 53'-4"
27'-6" 2" 21'-0" 2" 16'-0" 2" 16'-0" 2" 27'-6" 21'-0" 2" 16'-0" 2" 16'-0" 21'-0" 2" 16'-0" 2" 16'-0" C H U N T H A L E J O N E S A R C H I T E C T S DATE: PROJECT: COLEMAN VILLAGE

CITY VENTURES
1400 COLEMAN AVE.

SANTA CLARA, CALIFORNIA 95050

11.10. 2025
317082 SCALE: CONCEPTUAL 2ND BP_18 PLEX
1/8" = 1'-0"
l
~ CITY VENTURES Building It Forward HUNT
HALE
JONES
C Collaborative
~ KIER+WRIGHT
3RD FLOOR PLAN
BLDG. M _12-PLEX - PLANS 1 & 2 4409 SQ. FT.
108'-8" 27'-6" 2" 21'-0" 2" 32'-2" 2" 27'-6" 53'-4"
108'-8" 53'-4"
27'-6" 2" 21'-0" 2" 16'-0" 2" 16'-0" 2" 27'-6" 21'-0" 2" 16'-0" 2" 16'-0" 21'-0" 2" 16'-0" 2" 16'-0" C H U N T H A L E J O N E S A R C H I T E C T S DATE: PROJECT: COLEMAN VILLAGE

CITY VENTURES
1400 COLEMAN AVE.

SANTA CLARA, CALIFORNIA 95050

11.10. 2025
317082 SCALE: CONCEPTUAL 3RD BP_18 PLEX
1/8" = 1'-0"
7 , oo I
l>illl I
l
~ CITY VENTURES Building It Forward
TARRAR I UTILI TY ~ TRH TS
HUNT
HALE
. 1()1\lf=~
---
____e::u n
p::::J]<J
C Collaborative
~ KIER+WRIGHT
4TH FLOOR PLAN
BLDG. M _18-PLEX - PLANS 1 & 2 4409 SQ. FT.
108'-8" 27'-6" 2" 21'-0" 2" 16'-0" 2" 27'-6" 53'-4"
108'-8" 53'-4"
27'-6" 2" 21'-0" 2" 16'-0" 2" 16'-0" 2" 27'-6" 21'-0" 2" 16'-0" 2" 16'-0" 21'-0" 2" 16'-0" 2" 16'-0" 2" 16'-0"
C H U N T H A L E J O N E S A R C H I T E C T S DATE: PROJECT: COLEMAN VILLAGE

CITY VENTURES
1400 COLEMAN AVE.

SANTA CLARA, CALIFORNIA 95050

11.10. 2025
317082 SCALE: CONCEPTUAL 4TH BP_18 PLEX
1/8" = 1'-0"
l
~ CITY VENTURES Building It Forward HUNT
HALE
JONES
C L Collaborative
~ KIER+WRIGHT

ROOF PLAN
BLDG. M PLANS 1,2 & 4
108'-8" 53'-4"

SEE SOLAR PANEL PLAN FOR EXACT

LOCATION

CONCEPTUAL HVAC UNIT

LOCATION
C H U N T H A L E J O N E S A R C H I T E C T S DATE: PROJECT: COLEMAN VILLAGE

CITY VENTURES
1400 COLEMAN AVE.

SANTA CLARA, CALIFORNIA 95050

11.10. 2025
317082 SCALE: CONCEPTUAL RP_18 PLEX
1/8" = 1'-0"
0 CJ D
00 0
~ CITY VENTURES Building It Forward
TARRAR I UTILI TY ~ TRH TS
HUNT
HALE
~-- . 1()1\lf=~
C Collaborative
~ KIER+WRIGHT
D
D O
00 0
0 1ST FLOOR PLAN
BUILDING L - PLANS 1 & 2 3,993 SQ. FT.
85'-8" 23'-6"
16'-0" PLAN 7 AND 8B16'-0" 2" PLAN 7 AND 8B 4'-0" 27'-6"21'-0" PLAN 6 AND 8A 2"
METER
STACK

TESTBLOCK & METER HOUSE
PANEL
SPACE
FOR LV

PULL MAIN
METER
STACK 23'-6" 27'-6" 4'-0"
16'-0" 2" PLAN 7 AND 8B16'-0" 2" PLAN 7 AND 8B
85'-8" 2" 55'-2"
2ND FLOOR PLAN
BUILDING L - PLANS 1 & 2 4,726 SQ. FT.
85'-8" 21'-0" PLAN 6 AND 8A 27'-6"
85'-8" 55'-2" 27'-6"
16'-0" PLAN 7 AND 8B16'-0" 2" 2" PLAN 7 AND 8B16'-0" 2" PLAN 7 AND 8B 2"16'-0" PLAN 7 AND 8B 2" 18,171 SQ. FT. TOTAL
C H U N T H A L E J O N E S A R C H I T E C T S DATE: PROJECT: COLEMAN VILLAGE

CITY VENTURES
1400 COLEMAN AVE.

SANTA CLARA, CALIFORNIA 95050

11.10. 2025
317082 SCALE: CONCEPTUAL 1ST_2ND BP- 20 PLEX
1/8" = 1'-0"
~ CITY VENTURES Building It Forward
TARRAR I UTILI TY ~ TRH TS
HUNT
HALE
JONES
C Collaborative
~ KIER+WRIGHT
3RD FLOOR PLAN
BUILDING L - PLANS 1 & 2 4,726 SQ. FT.
85'-8" 16'-0" PLAN 7 AND 8B
16'-0" 2" PLAN 7 AND 8B 27'-6"21'-0" PLAN 6 AND 8A
2" 27'-6"
16'-0" 2" PLAN 7 AND 8B16'-0" 2" PLAN 7 AND 8B
85'-8" 2" 55'-2"
4TH FLOOR PLAN
BUILDING L - PLANS 1 & 2 4,726 SQ. FT.
85'-8" 21'-0" PLAN 6 AND 8A 27'-6"
85'-8" 55'-2" 27'-6"
16'-0" PLAN 7 AND 8B16'-0" 2" 2" PLAN 7 AND 8B16'-0" 2" PLAN 7 AND 8B 2"16'-0" PLAN 7 AND 8B 2"
C H U N T H A L E J O N E S A R C H I T E C T S DATE: PROJECT: COLEMAN VILLAGE

CITY VENTURES
1400 COLEMAN AVE.

SANTA CLARA, CALIFORNIA 95050

11.10. 2025
317082 SCALE: CONCEPTUAL 3RD_4TH BP- 20 PLEX
1/8" = 1'-0"
lbl= · ..
rr1
C,._
C
-
c:
,:_., ,
Ii,
IL I'll
~
,
l l l , 1
~ CITY VENTURES Building It Forward HUNT
HALE TARRAR I UTILI TY ~ TR HTS ,__.....,
lt)l\l~C::

C Collaborative
~ KIER+WRIGHT
71 ~ nRI Rn
p
[~
uBI Eu
~[><_
85'-8" 55'-2"

ROOF PLAN
BUILDING L PLANS 1 & 2

SEE SOLAR PANEL PLAN FOR EXACT

LOCATION

CONCEPTUAL HVAC UNIT

LOCATION
C H U N T H A L E J O N E S A R C H I T E C T S DATE: PROJECT: COLEMAN VILLAGE

CITY VENTURES
1400 COLEMAN AVE.

SANTA CLARA, CALIFORNIA 95050

11.10. 2025
317082 SCALE: CONCEPTUAL RP_20 PLEX
1/8" = 1'-0"
~ CITY VENTURES Building It Forward HUNT
HALE TARRAR I UTILI TY ~ TRHTS - ........... lr\l\lCC'
C Collaborative
~ KIER+WRIGHT
Cl r:;:1
0 00
00 llCI
00 DD
ll
ll ll
1ST FLOOR PLAN
PLAN 1A PLAN 1A.1 GARAGE: 360 SQ. FT. PLAN 1A.2 GARAGE: 304 SQ. FT. STAIR/ UTIL: 58 SQ. FT.

ENT. 17 RISERS @ 7.27" 16 TREADS @ 10.5"27'-6"
32'-2" 4'-0" 22'-6"
UP 1'-0"
2ND FLOOR PLAN
STUDIOS 1B LIVING: 377 SQ. FT. STAIR: 128 SQ. FT.

COMMON STAIR 17 RISERS @ 7.27" 16 TREADS @ 10.5"
16'-0" 16'-0" 27'-6"
32'-3"
UP
2" 17 RISERS @ 7.27" 16 TREADS @ 10.5" DN LNDY LNDY BTH. BTH. 32'-2"
PLAN 1B
STUDIO A PLAN 1BSTUDIO B PLAN 1A.1
1-CAR GARAGE PLAN 1A.21 CAR GARAGE 27'-6" 4'-0" 23'-6" 1'-0" 27'-6" 16'-0" 2" 16'-0"
32'-2"
C H U N T H A L E J O N E S A R C H I T E C T S DATE: PROJECT: COLEMAN VILLAGE

CITY VENTURES
1400 COLEMAN AVE.

SANTA CLARA, CALIFORNIA 95050

11.10. 2025
317082 SCALE: CONCEPTUAL PLAN 1A-1B_1ST AND 2ND FLOORS
1/4" = 1'-0"
~ CITY VENTURES Building It Forward
TARRAR I UTILI TY ~ TRHTS
HUNT
HALE
JONES
C Collaborative
~ KIER+WRIGHT
1 1ST FLOOR PLAN
PLAN 1A PLAN 1A.1 GARAGE: 323 SQ. FT. PLAN 1A.2 GARAGE: 307 SQ. FT. STAIR/ UTIL: 76 SQ. FT.

ENT. 17 RISERS @ 7.27" 16 TREADS @ 10.5" 27'-6"
32'-2" 4'-0" 22'-6"
UP 1'-0"
2ND FLOOR PLAN
STUDIOS 1B LIVING: 377 SQ. FT. STAIR: 128 SQ. FT.

COMMON STAIR 17 RISERS @ 7.27" 16 TREADS @ 10.5"
16'-0" 16'-0" 27'-6"
32'-3"
UP
2" 17 RISERS @ 7.27" 16 TREADS @ 10.5" DN LNDY LNDY BTH. BTH. 32'-2"
PLAN 1B
STUDIO A PLAN 1B
STUDIO B PLAN 1A.1
1-CAR GARAGE PLAN 1A.21 CAR GARAGE 27'-6" 10'-4" 1'-0" 20'-2" 31'-6" 16'-0" 4'-7" 16'-0"
32'-2" 3080 3080 3080
3068 3068 3080 3080
ADA

PDR ADA
PDR

ROOF BELOW
5'-9 4'-6" 6'-4" 1
2 6'-0 9'-6" " 12
"
C H U N T H A L E J O N E S A R C H I T E C T S DATE: PROJECT: COLEMAN VILLAGE

CITY VENTURES
1400 COLEMAN AVE.

SANTA CLARA, CALIFORNIA 95050

11.10. 2025
317082 SCALE: CONCEPTUAL PLAN 1A_1B _1ST AND 2ND_ADA
1/4" = 1'-0"
~ I! ' 1 '
CITY VENTURES L Building It Forward
TARRAR I ~ KIER+WRIGHT UTILI TY ~ TRH TS
DIN
KIT.
3RD FLOOR PLAN
PLAN 1A MAIN LIVING: 387 SQ. FT. TOTAL LIVING: 827 SQ. FT. STAIR: 109 SQ. FT. 17 RISERS @ 7.27" 16 TREADS @ 10.5" 16'-0" 16'-0" 27'-6"
32'-2"
DN
2" 4TH FLOOR PLAN
PLAN 1A UPPER LIVING: 440 SQ. FT. 17 RISERS @ 7.27" 16 TREADS @ 10.5" 16'-0" 16'-0" 27'-6"
32'-2"
UP
2" 17 RISERS @ 7.27" 16 TREADS @ 10.5" DN COMMON STAIR
BD. 1
LIV.

KIT.

DIN
LNDY LNDY BTH. BTH.
32'-2" 32'-2"
PLAN 1A.1
1 BD. TH PLAN 1A.21 BD. TH PLAN 1A.1
1 BD. TH PLAN 1A.21 BD. TH BD. 1
UP UP
12'-4" 7'-6" 12'-4" 27'-6"
C H U N T H A L E J O N E S A R C H I T E C T S DATE: PROJECT: COLEMAN VILLAGE

CITY VENTURES
1400 COLEMAN AVE.

SANTA CLARA, CALIFORNIA 95050

11.10. 2025
317082 SCALE: CONCEPTUAL PLAN 1A-1B_3RD AND 4TH FLOORS
1/4" = 1'-0"
------ r -- i
1 r rJ
~ CITY VENTURES Building It Forward
i
i
HUNT
HALE TARRAR I UTILI TY ~ TRHTS --
. 1()1\lf=~
7 7
C Collaborative
~ KIER+WRIGHT

GROUND FLOOR PLAN
PLAN 2A 16 RISERS @ 7.27" 15 TREADS @ 10.5"
ENT. 17 RISERS @ 7.27" 16 TREADS @ 10.5" STAIR / UTIL.: 109 SQ. FT. GARAGE: 364 SQ. FT.

W.I.C. 3RD FLOOR PLAN
PLAN 2A MAIN LIVING: 462 SQ. FT. TOTAL LIVING: 998 SQ. FT. STAIR: 116 SQ. FT. 4TH FLOOR PLANPLAN 2A UPPER LIVING: 536 SQ. FT.

P.BD
BTH.1BD. 2

LNDY DIN
LIV.

KIT.
21'-0" 27'-6"
21'-0" 22'-6"
18'-2" 2'-10" 1'-0" 4'-0" 22'-6" 12'-10
1 2
" 27'-6" 27'-6" 14'-0"
21'-0" 7'-11" 13'-1" 4'-1
1 2
"
8'-2" 10'-512
" 27'-6" 11'-5
1 2
" 10'-9" 5'-3
1 2
"
21'-0" 21'-0" 8'-2" 12'-10" 14'-7
1 2
" 13'-6" 9'-10" 1'-0" 9'-3" 18'-3" 27'-6"
21'-0" 27'-6"
2ND FLR. PLAN
PLAN 2 B - STUDIO 12'-8"
21'-0" 27'-6"
21'-0" 9'-11" 11'-1" 14'-11" 12'-7"
LIVING: 452 SQ. FT. STAIR: 125 SQ. FT.
21'-0"
DN 16 RISERS @ 7.27" 15 TREADS @ 10.5" DN 16 RISERS @ 7.27" 15 TREADS @ 10.5" DN 16 RISERS @ 7.27" 15 TREADS @ 10.5" UP UP UP PLAN 2B
STUDIO PLAN 2A1-CAR GARAGE PLAN 2A
MAIN LEVEL PLAN 2AUPPER LEVEL 4'-0"
2'-41
2 " COMMON STAIR COMMON STAIR
C H U N T H A L E J O N E S A R C H I T E C T S DATE: PROJECT: COLEMAN VILLAGE

CITY VENTURES
1400 COLEMAN AVE.

SANTA CLARA, CALIFORNIA 95050

11.10. 2025
317082 SCALE: CONCEPTUAL PLAN 2
1/4" = 1'-0"
~ CITY VENTURES Building It Forward
TARRAR I UTILI TY ~ TRH TS
□
HUNT
HALE
JONES
C Collaborative
~ KIER+WRIGHT
____ L_f
==t-~ I :
---+ -~
=~+-:
l
L

GROUND FLOOR PLAN
PLAN 2A 16 RISERS @ 7.27" 15 TREADS @ 10.5"
ENT. 17 RISERS @ 7.27" 16 TREADS @ 10.5" STAIR / UTIL.: 215 SQ. FT. GARAGE: 425 SQ. FT.

W.I.C. 3RD FLOOR PLAN
PLAN 2A MAIN LIVING: 462 SQ. FT. TOTAL LIVING: 998 SQ. FT. STAIR: 116 SQ. FT. 4TH FLOOR PLANPLAN 2A UPPER LIVING: 536 SQ. FT.

P.BD
BTH.1BD. 2

LNDY DIN
LIV.

KIT.
21'-0" 31'-6"
21'-0" 23'-0
1 2
"
14'-0" 1'-0" 13'-3" 30'-6" 12'-10
1 2
" 27'-6" 27'-6" 14'-0"
21'-0" 7'-11" 13'-1" 4'-1
1 2
"
8'-2" 10'-512
" 27'-6" 11'-5
1 2
" 10'-9" 5'-3
1 2
"
21'-0" 21'-0" 8'-2" 12'-10" 14'-7
1 2
" 13'-6" 1'-0" 9'-3" 18'-3" 27'-6"
21'-0" 31'-6"
2ND FLR. PLAN
PLAN 2 B - STUDIO 17'-3"
21'-0" 27'-6"
21'-0" 9'-11" 11'-1" 14'-11" 12'-7"
LIVING: 452 SQ. FT. STAIR: 125 SQ. FT.
21'-0"
DN 16 RISERS @ 7.27" 15 TREADS @ 10.5" DN 16 RISERS @ 7.27" 15 TREADS @ 10.5" DN 16 RISERS @ 7.27" 15 TREADS @ 10.5" UP UP UP PLAN 2B
STUDIO PLAN 2A
1-CAR GARAGE PLAN 2A
MAIN LEVEL PLAN 2AUPPER LEVEL 7'-5
1 2
"
2'-41
2 " COMMON STAIR COMMON STAIR
ADA
PDR
7'-0" 3080 3068 ROOF BELOW
C H U N T H A L E J O N E S A R C H I T E C T S DATE: PROJECT: COLEMAN VILLAGE

CITY VENTURES
1400 COLEMAN AVE.

SANTA CLARA, CALIFORNIA 95050

11.10. 2025
317082 SCALE: CONCEPTUAL PLAN 2 ADA
1/4" = 1'-0"
~ CITY VENTURES Building It Forward
TARRAR I UTILI TY ~ TRHTS
l
n
HUNT
HALE
JONES
-------■
C Collaborative
~ KIER+WRIGHT
REF. P
DW
DN
UP
REF. P
DW
UP
DN
PLAN 5 PLAN 4

GARAGE GARAGE
WH WH

ENTRY ENTRY
UP
PLAN 4
11' - 0"
PLAN 5
11' - 0"
53' - 6"
22' - 0"
UP
C T
R
C
T
R
DN UP
BED 2
BED 3
W/D
BATH 2
FAU

KITCHEN

GREAT ROOM

BALCONY
PLAN 4
7' - 11 1/2" 14' - 0 1/2"
22' - 0"
56' - 0"

PRIMARY BED

PRIMARY BATH
PDR.

CLO. FAU

KITCHEN

GREAT ROOM

BALCONY
LINEN
DN
PLAN 4
PLAN 5
DN
PLAN 5
30' - 8 1/2"
PLAN 4
24' - 3 1/2" 1' - 0"
22' - 0"
PLAN 5
BED 2
BED 3
BATH 2

PRIMARY BATH W/D

PRIMARY BED
LINEN

ROOF BELOW
50' - 6"
22' - 0"

ROOF BELOW
Scale:

Date:

Project Number:
© HUNT HALE JONES ARCHITECTS

COLEMAN VILLAGE
1/4" = 1'-0"
A3.4.1
CONCEPTUAL UNIT PLANS 4&5
11/10/2025
317082

CITY VENTURES
1400 COLEMAN AVE.

SANTA CLARA, CALIFORNIA 95050
1 SCALE: 1/4" = 1'-0"
1ST FLOOR PLAN 4&5 2 SCALE: 1/4" = 1'-0"2ND FLOOR PLAN 4&5 3 SCALE: 1/4" = 1'-0"3RD FLOOR PLAN 4&5 4 SCALE: 1/4" = 1'-0"4TH FLOOR PLAN 4&5 /
\L
====='l!:::=:::::1 -------'sc
/ / /

CITY VENTURES
Building It Forward
TARRAR
UTILITY lilJ CO HSU LTAHTS
HUNT HALE Collaborat,ve C
JONES ~ KIER+WRIGHT
REF. P
DW
REF. P
DW
PLAN 5 PLAN 4

GARAGE GARAGE

ENTRY ENTRY
BED 2
BED 3
FAU
W/D
BATH 2
KITCHEN PLAN 4

GREAT ROOM

BALCONY
DEN / OPT BD 4

KITCHEN

BALCONY
PLAN 5 (DEN OPT)
OPT BATH 4
DEN / BD 4

GREAT ROOM

PRIMARY BED

PRIMARY BATH
PDR.

CLO. FAU
LINEN
PLAN 4
PLAN 5
BED 2
BED 3
BATH 2

PRIMARY BATH W/D

PRIMARY BED
LINEN
Scale:

Date:

Project Number:
© HUNT HALE JONES ARCHITECTS

COLEMAN VILLAGE
1/4" = 1'-0"
A3.4.1B
CONCEPTUAL 4-BEDROOM OPTION
11/10/2025
317082

CITY VENTURES
1400 COLEMAN AVE.

SANTA CLARA, CALIFORNIA 95050
1 SCALE: 1/4" = 1'-0"
1ST FLOOR PLAN 4&5 2 SCALE: 1/4" = 1'-0"2ND FLOOR PLAN 4&5 3 SCALE: 1/4" = 1'-0"3RD FLOOR PLAN 4&5 4 SCALE: 1/4" = 1'-0"4TH FLOOR PLAN 4&5 D
:: II "---L:

CITY VENTURES
Building It Forward HUNT C
□
TARRAR
UTILITY lilJ CO HSU LTAHTS
HALE Collaborat,ve
JONES ~ KIER+WRIGHT
REF. P
DW
REF. P
DW
WH
WH
UP UP
C T
R
C
T
R
PLAN 5 (ADA)PLAN 4

GARAGE GARAGE
ENTRY
ENTRY
WINDOW @

END UNIT

CONDITION
ONLY
PLAN 5
11' - 0"
PLAN 4
11' - 2"
11'-0" @
INT. UNIT

CONDITION
2x6 @ END
UNIT;
2x4 DEMISING
WALL @ INT.

UNIT
53' - 6"
22' - 2" (22'-0" @ INT. COND.)
59' - 8"
DN
UP
BED 2
BED 3
W/D
BATH 2
FAU

KITCHEN

GREAT ROOM

BALCONY
PLAN 4
DN
UP
WINDOWS @

END UNIT

CONDITION
ONLY, TYP. (5)56' - 0"
22' - 2" (22'-0" @ INT. COND.)
7' - 11 1/2" 14' - 2 1/2" (14'-0 1/2" @ INT. COND.)
PLAN 5
62' - 2"

PRIMARY BED

PRIMARY BATH
PDR.

CLO. FAU

KITCHEN

GREAT ROOM

BALCONY
LINEN
DN
PLAN 4
PLAN 5
DN
UP
WINDOWS @

END UNIT
COND. ONLY,
TYP. (3)
PLAN 5
30' - 8 1/2"
PLAN 4
25' - 3 1/2"
62' - 2"
22' - 2" (22'-0" @ INT. COND.)
PLAN 5
BED 2
BED 3
BATH 2

PRIMARY BATH W/D

PRIMARY BED
LINEN

ROOF BELOW
WINDOWS @

END UNIT

CONDITION
ONLY, TYP. (5)

ROOF BELOW
50' - 6"
22' - 2" (22'-0" @ INT. COND.)
Scale:

Date:

Project Number:
© HUNT HALE JONES ARCHITECTS

COLEMAN VILLAGE
1/4" = 1'-0"
A3.4.2
CONCEPTUAL UNIT PLAN 5 (ADA)
11/10/2025
317082

CITY VENTURES
1400 COLEMAN AVE.

SANTA CLARA, CALIFORNIA 95050
1 SCALE: 1/4" = 1'-0"
1ST FLOOR PLAN 4&5 2 SCALE: 1/4" = 1'-0"2ND FLOOR PLAN 4&5 3 SCALE: 1/4" = 1'-0"3RD FLOOR PLAN 4&5 4 SCALE: 1/4" = 1'-0"4TH FLOOR PLAN 4&5

CITY VENTURES
Building It Forward
TARRAR
UTILITY lilJ CO HSU LTAHTS
" n ::--1R
n
n
□
HUNT HALE Collaborat,ve C
JONES ~ KIER+WRIGHT
fJ
/
/
\ · -------'
UP
(END)
PLAN 4 (AIP /ADA)
PLAN 5
PLAN 5 (ADA)
(@ BLDG A, B, D & E)
12' - 0"
10' - 4"
(36" MIN.)
4' - 6" 5' - 6 1/2"
24" 36"
3' - 4"
4' - 11"
44" MIN.
4' - 6 121/256"
(36" MIN.)
3' - 5 125/128" 8' - 0"
3' - 6"
3' - 1 1/2" 1' - 6"
2' - 4 1/2" 18' - 0"
10' - 4" 44"
1' - 6"

WH T R C
Scale:

Date:

Project Number:
© HUNT HALE JONES ARCHITECTS

COLEMAN VILLAGE
1/4" = 1'-0"
C:\Users\Priya Arora\Documents\Revit Local Files\317082_SC2-Coleman [email protected] 10/23/2025 2:08:44 PM A3.4.2 B

CONCEPTUAL AEGING IN PLACE/ADA
11/10/2025
317082

CITY VENTURES
1400 COLEMAN AVE.

SANTA CLARA, CALIFORNIA 95050
1ST FLOOR PLAN

CITY VENTURES
Building It Forward
TARRAR
UTILITY lilJ CO HSU LTAHTS
HUNT HALE Collaborat,ve C
JONES ~ KIER+WRIGHT
I I
C _ --' _ \j _ i _ _ C
□

VINYL WINDOW WINDOW HEAD AND SILL
@ STUCCO FINISH
6" 6" 6"SLOPED SILL
4" STUCCO RETURN

STUCCO FINISH
TYP.

VINYL WINDOW
6" 6" 6"SLOPED WD. SILL
4" STUCCO FACE

VERTICAL SIDING
TYP.

WINDOW HEAD AND SILL
@ VERTICAL SIDING
2X WD. PICTURE

FRAME TRIM AND
RETURN 4" 4"

VINYL WINDOW
6" 6" 6"SLOPED

ROWLOCK SILL
4" STUCCO RETURN

BRICK VENEER
TYP.

WINDOW HEAD AND SILL
@ BRICK
SAILOR COURSE @HEAD

WINDOW HEAD AND SILL
@ SIDING RECESS INSET PANEL 4" 6"

VINYL WINDOW
SLOPED WD. SILL
4" SIDING EDGE AT

INSET PANELS

VERTICAL SIDING
TYP.
2X WD. TRIM

SURROUND AT WINDOWS AND
PANELS

ENTRY DOOR AT RECESS,
AWNING AND MTL. RAIL
1234

SLIDING GLASS DOOR

THERMATRU GLASS PANEL DOOR

SOLDIER COURSE AT DECK FACE METAL RAILING

STUCCO FINISH AT DECK

INTERIOR

WALL BEYOND

SURFACE MOUNTED

LIGHT FIXTURE UNIT IDENTIFICATION SIGNAGE

PUSH BELL

SOLDIER COURSE AT DECK FACE

LINE OF RECESS AT DOOR WALL

STEEL FRAME AWNING W/ GSM ROOF
GSM. PARAPET METAL COPING

GSM, COLLECTOR &
3" DOWNSPOUT 12" 9" DECK
LEVEL

SPILLWAY GUTTER O/ BRICK FINISH

PARAPET DETAIL AT SIDING AND STUCCO
STUCCO OR WD. SIDING

LEADER HEAD
TPO ROOFING UP WALL MIN. 8" EYE BOLT W/ 18" WELDED PLATES OVERFLOW SCUPPER VINE TRELLIS AT BRICK WALL

CABLE CONTINUOUS

THROUGH EYEBOLTS

VINE PER

LANDSCAPE

CONCEPT DETAILS
A411

COLEMAN VILLAGE

CITY VENTURES
I i' 111 t ' '
••
t ' '
f
-=-~*
I-,,---+- I ,--
--
1-
-'<-
-'<-
-'<-
-
!
--------
-'<-
-
-'<-
'
----
DATE:

PROJECT:

COLEMAN VILLAGE

CITY VENTURES
1400 COLEMAN AVE.

SANTA CLARA, CALIFORNIA 95050

04.30.2024
Collaborative 317082
L-1

11.07.2025
CTV184

CONCEPT IMAGERY

CITY VENTURES
Building It Forward
DATE:

PROJECT:

COLEMAN VILLAGE

CITY VENTURES
1400 COLEMAN AVE.

SANTA CLARA, CALIFORNIA 95050

04.30.2024
Collaborative 317082
L-2
LEGEND
Community Open Space and Barbecue Area -
See Enlargement Sheet
Community Garden and Dog Run -
See Enlargement Sheet
Parkway and Street Trees along Coleman Ave
Enhanced Vehicular Paving
Pedestrian Streetscape and Paseo Improvements:
-Enhanced Paving
-Street Furniture (Benches, Planters, Bike racks)
-Tree Planting in Accessible Grates
Overhead String Lights at Private Alleys
Stormwater Basin
Open Lawn Area
Private Patio
Community Parking Stall
Transformer
Shade Trees with Bench Seating
Overhead Trellis with Lounge Seating
Perimeter Block Wall and Pilasters
Community Mailboxes
Scooter Parking
Rideshare Drop Off
3 1
1 4
2 2
5 8
12 6
10 9
13 14
16 15
17 7
11 COLEMAN AVE
3 7
7 4
5 11
6 5 15 16 8
14 9
14 17 9 10
8 4
6 4
11 10
13 10 13
14 12
7 11.07.2025
CTV184
0 15’ 30’ 60’
Scale: 1”= 30’-0” CONCEPTUAL LANDSCAPE PLAN

CITY VENTURES
Building It Forward
•
•
• • •
• • • • • • • • • • • •
DATE:

PROJECT:

COLEMAN VILLAGE

CITY VENTURES
1400 COLEMAN AVE.

SANTA CLARA, CALIFORNIA 95050

04.30.2024
Collaborative 317082
L-3

COMMUNITY LAWN AND BARBECUE AREA COMMUNITY GARDEN AND DOG RUN 7 8 9 2 3
6 6
4 11 18 5 3
4 3
14 13
3 16
17 15
8 12
LEGEND
Natural Turf Lawn
Shade Structure (46’x25’)
Enhanced Pedestrian Paving
Community Walk (Natural Gray Concrete)
Accent Tree Row
Built-in Barbecue Island
Planter Pot
Picnic Table
Lounge Seating
Stormwater Basin
Community Mailbox
Decomposed Granite Paving
Raised Planter Bed
Vine Trellis
Dog Run Entry and Perimeter Fence
Turf Block Pavers at Utility Access Easement
Utility Access Easement Gate
Scooter Parking
3 13
7 17
18 1
11 5
15 4
14 8
9 10
2 12
6 16
1 10
1 11.07.2025
CTV184

CONCEPTUAL LANDSCAPE ENLARGEMENTS
0 5’ 10’ 20’
Scale: 1”= 10’-0”

CITY VENTURES
Building It Forward
• • • • • • • • • • • • • • • • • •
DATE:

PROJECT:

COLEMAN VILLAGE

CITY VENTURES
1400 COLEMAN AVE.

SANTA CLARA, CALIFORNIA 95050

04.30.2024
Collaborative 317082
L-4
LEGEND
Property Line Fence/Gate (6’ ht.)
Property Line Pilaster (6’-6”’ ht.)
Patio Fence/Gate (3’-6” ht.)
Dog Park Fence/Gate (5’-6” ht.)

COLEMAN AVE

PROPERTY LINE PILASTER
SCALE: 3/8”=1’-0”

PROPERTY LINE WALL
SCALE: 3/8”=1’-0”

PATIO FENCE/GATE
SCALE: 3/8”=1’-0”

DOG PARK FENCE
SCALE: 3/8”=1’-0”

11.07.2025
CTV184
0 15’ 30’ 60’
Scale: 1”= 30’-0” CONCEPTUAL WALL AND FENCE PLAN
... ~== =~ == ~ .... l
:
•••••••
tJ
I I/
l ~ ~
~
I I

CITY VENTURES
Building It Forward
DATE:

PROJECT:

COLEMAN VILLAGE

CITY VENTURES
1400 COLEMAN AVE.

SANTA CLARA, CALIFORNIA 95050

04.30.2024
Collaborative 317082
L-5
LEGEND
ADA Path of Travel
(Circulation/Connection for ADA Units, Public ROW Access, and Community Amenity Spaces)
Bicycle Path of Travel
(Circulation/Connection for Short Term Storage [Bike Racks], Long Term Storage [Garages], and Bike Path along Coleman Ave)
ADA Accessible Unit
Community Bike Racks
Community Amenity Space COLEMAN AVE

11.07.2025
CTV184
0 15’ 30’ 60’
Scale: 1”= 30’-0” CONCEPTUAL CIRCULATION PLAN
----- () ·-~.:..----~•
------- --~=-_,. ~~-- I
-------- ~~------------~--- •
0 I O I
I •---/!.

I
·-------------

CITY VENTURES
Building It Forward
DATE:

PROJECT:

COLEMAN VILLAGE

CITY VENTURES
1400 COLEMAN AVE.

SANTA CLARA, CALIFORNIA 95050

04.30.2024
Collaborative 317082
L-6

UOH UOH UOH
6" MATCHLINE - SEE SHEET L-7

COLEMAN AVE

11.07.2025
CTV184

CONCEPTUAL PLANTING PLAN
0 10’ 20’ 40’
Scale: 1”= 20’-0”
NOTE: Planting plan is conceptual and subject to change during the Construction Document phase of development.

TREE SCHEDULE:

KEY BOTANICAi. NAME COMMON NAME SIZE FORM
"""'' lv:Hpa/m,;ifum Songokokv.JopaneseMople Po,PI," to.Brooch I M,Mo, A-butus'Mt1rinr:1' StrawbenyTree P,,P/o" "'"""" I ""'"" l.agers/Joemioindicuxfuuriei Nalchm:CrapeMyrt/1 P«Plo" Slandatd 'No•~· MoglG Mognoiio grandi//ora 'little Gem' l.iltle Gem Soutliem MoQno!io P,,P/o" to.Brooch -- Pio ... Plotonusocerifo/io'Columbio' LOJIOO'lPloneT,ee P«Plo" Slondard --- ■ l'odGro Podooirpingll!cilior AbicunFemPine Po,PI," Slandatd ---- SHRUB SCHEDULE: I SYMBOL BOTANICAi. NAME COMMON NAME SIZE SPACING ---• 0 Com11tslolooifen:r AmicfiraRldTwigDog"1:10d 5ga/. Perl'lon --- ■ 0 Franou/ocof;fumico'SonBruno' MoundSonBrunoCoffeebecy Sga/. PerPlon -- 0 //wCIWOOlu'SkyPencif SlcyPenci/Jlex Sgal. PerPlon - I © llax1t1mi!oria'Nuna' Doi.orfYcwpo,1Hoffy Sgal. P.rPlon I
I
\ I
I
\
© 1.igustrurn iCJponicum 'Temm.,m' WnxleofPrivet Sga/. PerPlon • (a l~n:r,oogiro11o'f'la6num Plofinumller:iulyl.omandra Sgal. PerPlon :::- I ® Muhlenbe'll'ia~ns Deer Gross Sga/. PerPlon - · @ Pittosporumlernlifo/Jum Wrink!.dBfueKohuhu Sgal. 1'9rPlon @ Pfffosporum/lJbiroV11riagalo' ./apanti11Mod:Oro"ll'I Sgal. PerPlon --- ---· 1 8 /'odooilPIJSm=phyl/11$ Yew-Pine Sgal. PerPlon - EB PrunuscaroUniano'Compocta' DwarfCamlinol.aure/Cheny JSgal. PerPlon @ Rosalrybrid'Maipcai' Pink Ori~ Sga/. PerPkm
GROUNDCOVER SCHEDULE:
\
SYMIOl IOTANICA.l NAME COMMON NAME SIZE SPACING
~ ~/a=roslisxaculilloru 'Karl Fealh.r RNd Gross Igo/.
24' o.c.

Igo/. 18'o.c.
\ ~frig8rookarvinskion11t Me«onOoisy Igo/. J8'o.c.
~ Juncuspglens CatrforniaGrayRuth 5gal. 30'o.c. ~ l~~condensotus'Call)Qtl GiantWildR)e 5ga/. 30'o.c. \ ~ 1.amandra I0119"°/ki ktlc Frr:,$1 IYdic: FrostAJ.at Ruth 5gal. 30'o.c. ~l.anicerajaponica'HaJ/iana' Japgn-Ha~clcle Igo/. 24' o.c. f•::::.•::::.j ~mpo,vitc,um'Putoli CreepingM)q,orum Igo/. 24' o.c.
\ DIIIIIIIIIlI] So/viome/lifero BlackSage !gal. 30'o.c. ~~~~4 Troc/Jeb!permumi<Jsminoides S1ar.kJStnJr11 Igo/.
24' o.c.

Igo/. 30'o.c.
\ l;;,;;<'
'i'J "°"""°'" Sod Sod S1.dMbr
\
\
\

CITY VENTURES
Building It Forward
DATE:

PROJECT:

COLEMAN VILLAGE

CITY VENTURES
1400 COLEMAN AVE.

SANTA CLARA, CALIFORNIA 95050

04.30.2024
Collaborative 317082
L-7
6" MATCHLINE - SEE SHEET L-6

11.07.2025
CTV184

CONCEPTUAL PLANTING PLAN
0 10’ 20’ 40’
Scale: 1”= 20’-0”
NOTE: Planting plan is conceptual and subject to change during the Construction Document phase of development.

TREE SCHEDULE:

KEY BOTANfCAl NAME COMMON NAME SIZE FORM
"'"'' /Joirpo/motum Sangokohi.JoponeseMople PerPlon ""'"""" MMw MlllWS'MarillO' SmiwbenyTree PerP/an ''"'"'" l.aglnd IL<lllllmll>lllflia imfimxltwriei NaldmCrope,¼,t/a - PerP/on ''"'"'" ,.,.,,c Magnolia grondilioro 'Uffle Gem' Uttfe Gem Soulhem Magnot.r.r PerP/an ""'"""" "'"' PlcrkmU5rscerifoJio'Cofumbicr' l..ondonPkmeTree """" ''"'"'" PodGro /'odo,;orp1,1$g/OO/Jor AAiam faml'!ne PerP/an Standard SHRUB SCHEDULE:

SYMBOL BOTANICAi. NAME COMMON NAME SIZE SPACING
0 Com11tslolonifen:z Ardicfi111 RldTwigDogwood 5ga/. Pet-Plan 0 Fran(l!lkicottlornico'Sanllruno' McundSanBrunoCofleebeny 5{101. ""'"" 0 l!nawnola'SlcyPencif SkyPenci/1/u 5{101. f'erP/on © Jlu¥0ffliloria'Nana' DworfYavponHol!-f 5gal. ""'"" © liguslrum/apooicum7eiiam,m' W()%}e<JfP~ 5ga/. PerP/on 6:) IWl/l(lJKl(OMljjiMKl'l'latinum Pbtimimllei;ruly!.omandro "'""' 5ga/. f'erP/an @ MuhlwibatgKJrigans ""'"""' 5{101. PerP/on
@ />fflo$pol'llmle!luifo/ium Wrink!adB/ue Kohuhu 5{101. P.,Pkm @ l'iffosporumklbiro
Variegalo' JopaneseMod;On:mg• '"'· PerPlon
El /'odowrp11SrntXF0phy/hn YewPine '"'· PerP/an
EB Prunuscoro/'miono'Compada' DwarlCaro/ioo Laure! Oieny )5{101. P,,Pkm @ Rosahybrid'M
1ip:os' PinkDrift 5{101. PerP/an
GROUNDCOVER SCHEDULE:

SYMBOL BOTANICAL NAME COMMON NAME SIZE SPACING
~=ros/is,r......,,;,,,,.ro'KarlfaalnerR..dGross !{IOI.
24' o.c.
('.:'.;:;:::;:;::::j DK11111l/af1JYO!u1a l.ilt/eRev !gal. JB"o.c. ~frigerookaMnslcialWS MexicanDaisy Jgal. JB"o.c.
~ Ju11CU1pr:ilens Ccrtrfomia GroyRuth '"'· 30'o.c.
~ ~condenool11S'Coll)l:lll GiontWild~ 5{101. 30'o.c.

ES::J 1.omr;mdro Jongifollo :Aidlc flOlf Ardic Frost Mat Rush 5gal. 30'o.c. ~ looicero ioponko 'Ha//iooo' Japanen Hmieysudde lgol.
24' o.c.
~ ~mparmo/'K1m'Plllah CreepingMyoporum 1{101,
24' o.c.

DIIIIIIIIIJI] Sa!viomeltifeti:i BlackSage Igo/. 30'o.c. ~~~~~ Trochelospermumjosmiooides Star.knm!ne 1{101. 2-4'." o.c.

Jga/. 30'o.c.
l:;:\}::;·,,i:;_~d Marmhon II Sod Soo
t<<·>>>I 8/o-F!JtrullonMlx S11dMix

CITY VENTURES
Building It Forward
DATE:

PROJECT:

COLEMAN VILLAGE

CITY VENTURES
1400 COLEMAN AVE.

SANTA CLARA, CALIFORNIA 95050

04.30.2024
Collaborative 317082
L-8
Low Water Use - 13,100 SF
Medium Water Use - 13,818 SF
High Water Use - 5,080 SF
Hydrozone: Eto: KL LA Sq. Ft. Conversion SLA Sq. Ft. MAWA Landscaped Area 49.4 0.55 31,470 0.62 0 530,125
MAWA= Maximum Applied Water Allowance (gallons per year) Eto= Reference Evapotranspiration from Appendix C (inches per year)

0.50= Evapotraspiration Adjustment Factor (ETAF)

1.0= ETAF for Special Landscaped Area
LA= Landscaped Area includes Special Landscape Area (square feet)

0.62= Conversion Factor (to gallons per square foot)

0.3= the additional ET adjustment Factor for Special Landscape Area (1.0- 0.7= 0.3) SLA= Special Landscape Area (square feet)
Applicant to fill in boxes below:

Eto (Reference Evapotranspiration from Appendix C inches per year) Landscaped Area includes Special Landscape Area (square feet) Special Landscape Area (square feet)
Hydrozone: Eto: KL Sq. Ft. Conversion IE EAWU
Low Water Use Shrubs (Drip) 49.4 0.2 13,645 0.62 0.81 103,190 Medium Water Use Shrubs (Drip) 49.4 0.5 12,885 0.62 0.81 243,606 High Water Use (Rotor) 49.4 0.7 4,940 0.62 0.73 145,084 High (Water Feature) 49.4 1.0 - 0.62 1.00 -
Total EAWU: 31,470 491,880
EAWU= Estimated Applied Water Use (gallons per year)
Eto= Reference Evapotranspiration from Appendix C (inches per year) KI= Landscape Coefficient
LA= Landscaped Area (square feet)

0.62= Conversion Factor (to gallons per square foot)
IE= Irrigation Efficiency= IME X DU (See definication in Appendix E for exmaplne IE percentages) IME= Irrigation Management Efficiency (90%)
DU= Distribution Uniformity of Irrigation Head
KI= Ks x Kc x Kmc
Ks= species factor (range 1.0- 0.9) (see WUCOLS list for values) Kd= density factor (range 0.5- 1.3) (see WUCOLS list for density value) Kmc= microclimatic factor (range 0.5- 1.4) (see WUCOLS) Table A- PF (Plant Factor)
Cool Season Turf= 0.8
Warm Season Turf= 0.7
High Water Use Plants= 0.7 (can be between 0.7-0.9)
Moderate Water Use Plants= 0.5 (can be between 0.4-0.6) Low Water Use Plants= 0.2 (can be between 0.1-0.3)
Very Low Water Use Plants= 0.1
IE (Irrigation Efficiency)- Appendix E
Pop-up Stream Rotor= 0.73
Rotor Head= 0.76
Microspray= 0.76
Bubblers= 0.77
Drip Emitters= 0.81
Subsurface Irrigation= 0.81
Project Name: 1400 Coleman, Santa Clara, CA

WATER EFFICIENT WORK SHEET
Total EAWU = (Eto x KL x LA in Sq.ft. / IE)= Gallons per Year

49.4 31,470
0 Maximum Applied Water Allowance (MAWA)
Estimated Annual Water Use:

Total MAWA = (Eto x 0.50 x LA in Sq.ft. x 0.62)+(Eto x 1.0 x SLA in Sq.ft. x 0.62)= Gallons per year for LA + SLA Date: February 9th, 2023
LEGEND

11.07.2025
CTV184
0 15’ 30’ 60’
Scale: 1”= 30’-0” CONCEPTUAL LANDSCAPE PLAN
-
-
-
~
( ~ CITY VENTURES
Building It Forward
City of Santa Clara
Agenda Report
1500 Warburton Avenue
Santa Clara, CA 95050
santaclaraca.gov
@SantaClaraCity
25-1519 Agenda Date: 11/18/2025

REPORT TO COUNCIL

SUBJECT
Public Hearing: Action to Adopt a Resolution of Necessity to Acquire Certain Real Property Interests on 881 Duane Avenue, Santa Clara, California, from the Owner of Record for Purposes of Implementing the Silicon Valley Power 115kV Transmission Line Project

COUNCIL PILLAR
Deliver and Enhance High Quality Efficient Services and Infrastructure

BACKGROUND
To support the growing electric demand and service needs within the City of Santa Clara (City), Silicon Valley Power (SVP) has identified the need for the construction of a 115-kilovolt (kV) transmission line connecting the Northern Receiving Station (NRS) and the Kifer Receiving Station (KRS) (the “Project”). This new transmission line will enable SVP to deliver additional power, balance electric loads across the City’s three receiving stations, and enhance overall system reliability.

After evaluating three potential transmission routes, the City Council approved the preferred route on November 12, 2024 (RTC #24-1040), an overhead alignment along Lafayette Street, Bassett Street, and Duane Avenue. The route was selected based on its overall feasibility, least impact to residents and businesses, permitting constraints, ability to meet the schedule, flexibility in power delivery, ease of maintaining the system, and reduced construction disruption to the public as compared to the other alternatives.

The City Council has previously taken several actions on the Project:
· March 19, 2024 - RTC #24-1614 - Informational Report
· November 12, 2024 - RTC #24-1040 - Action on a Mitigated Negative Declaration (MND) and Mitigation Monitoring and Reporting Program (MMRP) and Route Approval for the Project o Approved the Adoption of a MND and the MMRP.
o Approval of Route A, Option 1, for an entirely overhead alignment of the new 115kV transmission line.
· February 25, 2025 - RTC #25-212 - Authority to Execute Purchase and Sale Agreements (PSAs) for Easement Acquisitions
Other actions taken for this Project include two virtual community meetings held on April 25, 2024, and May 23, 2024, as well as an in-person public engagement meeting held on August 22, 2024, to present and take comments from the community on the transmission line route.

The Project requires the acquisition of twenty (20) easements for SVP’s electrical facilities. Property City of Santa Clara Page 1 of 4 Printed on 11/13/2025
powered by Legistar™
25-1519 Agenda Date: 11/18/2025
owners have executed purchase and sale agreements for ten of the required easements. The City Council adopted two Resolutions of Necessity on June 24, 2025, one Resolution of Necessity on July 8, 2025, and five Resolutions of Necessity on August 19, 2025, for eight other easements.

The City requires an easement on 881 Duane Avenue, Santa Clara, California (Easement Area), comprised of approximately 7,000 square feet of property as more fully described in the Resolution of Necessity, attached to this Report to Council.

DISCUSSION
On August 8, 2024, the City conducted an appraisal of the Easement Area and, subsequently sent an offer letter based on the appraised value for the Easement Area to the property owner on November 13, 2024. Following the initial outreach, the property owner designated a representative to lead negotiations. Between January and March 2025, the City conducted regular follow-ups and provided project documents, aerial exhibits, and a draft purchase and sale agreement to facilitate the property owner’s internal legal review. The property owner proposed monthly coordination meetings, and the City agreed to maintain regular communication. From March through May 2025, the City responded to multiple information requests regarding the easement location, design details, and impacts on existing buildings (as the requested easement area overlaps portions of the existing buildings). In May 2025, the property owner’s legal counsel assumed negotiations on behalf of the property, requested additional technical information, and provided a redlined version of the easement agreement on June 19, 2025. Formal negotiations between SVP’s outside counsel and the property owner’s counsel began on July 2, 2025, and have been unsuccessful in negotiating final easement language. Thus far, the property owner’s legal counsel has declined to discuss any pricing for the easement area.

City acquisition of the Easement Area is necessary for the Project and the City’s reasonable efforts to acquire it through negotiations have not been successful and the property owner has not accepted the City’s offer. Therefore, it has become necessary for the City to acquire the Easement Area through the eminent domain process. At this point, in order to proceed with acquisition of the Easement Area under the eminent domain process, the law requires the City Council to hold a public hearing, consider all testimony presented, and in the City Council’s discretion, adopt a Resolution of Necessity making certain findings. These findings, along with the factual basis necessary to make the findings, are set forth below:
· The public interest and necessity require the Project.

The completion of the Project is one of the key projects that are needed to increase SVP’s system capacity to approximately 1300-megawatt (MW). Until the Project is completed, SVP’s system capacity will be limited to 819MW. This is insufficient to meet projected electric loads within the City. This Project will enable SVP to deliver additional power, balance electric loads across the City’s three receiving stations, and enhance the overall system reliability. · The Project is planned or located in the manner that will be the most compatible with the greatest public good and the least private injury.

The SVP evaluation team for the Project consisted of internal SVP Engineering staff, design and environmental engineering consultants, and program management staff. The SVP evaluation team conducted a comprehensive analysis and evaluation, employing various methodologies such as potholing and ground-penetrating radar (GPR) surveys. This in-depth assessment took into consideration SVP’s load growth and system planning projections, City of Santa Clara Page 2 of 4 Printed on 11/13/2025
powered by Legistar™
25-1519 Agenda Date: 11/18/2025
schedule, cost estimation, required easements and permits, and engineering judgment. The goal was to determine feasible route alignments, identify a preferred route, and explore potential overhead and underground options within the preferred route. The findings favored the preferred route for the Project which is the all-overhead option set forth in Attachment 2 of RTC #24-1614. The Project alignment chosen will impact less residents and businesses than the other considered alignments, be achieved at less cost, and be delivered more quickly. · The Easement Area sought to be acquired is necessary for the Project.

The Easement Area is necessary to achieve the technical needs of the Project as it is within the alignment of the selected route. The majority of the route will be built within the public right -of-way; however, the Easement Area adjacent to the right-of-way is required for maintenance purposes and to ensure the proper electrical conductor clearances are met. The Easement Area also takes into account the necessary clearances from the blow out or sway of the electrical conductors.
· The offer required by Section 7267.2 of the Government Code has been made to the Owner of Record for the full amount established as the fair market value of the Easement Area.

On November 13, 2024, the City made an offer to the Owner of Record to acquire the Easement Area for an electric overhead easement upon the value determined by an independent state licensed and certified appraiser in accordance with the above referenced Government Code Section.

The Resolution of Necessity requires approval by a two-thirds vote of the City Council. If the City Council adopts the recommended Resolution of Necessity, the City will deposit the necessary funds for the Easement’s probable compensation with the State Condemnation Deposit Fund and file an eminent domain complaint with the Santa Clara County Superior Court to seek possession of the property.

If the City Council adopts the Resolution of Necessity, the parties can continue to negotiate in an effort to come to a mutual agreement on compensation for the easement.

ENVIRONMENTAL REVIEW
The Mitigated Negative Declaration (MND) and Mitigation and Reporting Program (MMRP) were prepared for the Project in conformance with CEQA. These documents and Notice of Availability were posted on the City’s website at http://www.santaclaraca.gov/ceqa and circulated for a 30-day review period from July 31, 2024, to August 30, 2024.

The MND examined environmental impacts associated with the Project. The MND identified potentially significant impacts to air quality, biological, cultural resources, geology and soils, hazards and hazardous materials, hydrology and water, noise, and traffic/transportation. However, the MND and MMRP incorporates mitigation measures to reduce the potentially significant impacts to less-than -significant.

The MND and MMRP were adopted by the City Council on November 12, 2024, by Resolution No. 24 -9386.

FISCAL IMPACT
City of Santa Clara Page 3 of 4 Printed on 11/13/2025
powered by Legistar™
25-1519 Agenda Date: 11/18/2025
There is no fiscal impact to the City for adopting the action on a Resolution of Necessity to acquire certain real property interests on 881 Duane Avenue, Santa Clara, California, from the Owner of Record other than administrative staff time and expense. The anticipated easement costs for the Project are currently budgeted within the Electric Utility Capital Fund in the NRS-KRS 115kV Line project.

COORDINATION
This report has been coordinated with the Finance Department and the City Attorney’s Office.

PUBLIC CONTACT
Public contact was made by posting the Council agenda on the City’s official-notice bulletin board outside City Hall Council Chambers. A complete agenda packet is available on the City’s website and in the City Clerk’s Office at least 72 hours prior to a Regular Meeting and 24 hours prior to a Special Meeting. A hard copy of any agenda report may be requested by contacting the City Clerk’s Office at (408) 615-2220, email [email protected] or at the public information desk at any City of Santa Clara public library.

Additionally, on October 20, 2025, a letter (attached) was mailed to the property owner, as verified in the Title Report. The letter included notification of the public hearing and consideration of a Resolution of Necessity. A Notice of Intention to Adopt a Resolution of Necessity stating that the hearing before the City Council is scheduled for November 18, 2025, and Request to be Heard documentation were also included as attachments to the letter.

ALTERNATIVES

1. Adopt a Resolution of Necessity to Acquire Certain Real Property Interests.

2. Do not adopt a Resolution of Necessity to Acquire Certain Real Property Interests.

RECOMMENDATION
Adopt a Resolution of Necessity making the required findings to acquire certain real property interests on 881 Duane Avenue, Santa Clara, California, from the Owner of Record for purposes of implementing the Silicon Valley Power 115kV Transmission Line Project (Five affirmative votes required [California Code of Civil Procedure section 1245.245]).

Reviewed by: Nico Procos, Director of Silicon Valley Power Approved by: Jovan D. Grogan, City Manager

ATTACHMENTS

1. 881 Duane Ave, November 13, 2024, Offer Letter

2. Resolution of Necessity - 881 Duane Ave

3. 881 Duane Ave, Notice of Intention to Adopt Resolution of Necessity City of Santa Clara Page 4 of 4 Printed on 11/13/2025
powered by Legistar™

SILICON
VALLEY
POWER. CITY OF SAN TA CLARA
~ The Center of What's Possfble
Nov. 13, 2024
Storage Equities, Inc.

P .0. Box 25025
Glendale, CA, 91221
SUBJECT: OFFER TO PURCHASE OVERHEAD ELECTRIC EASEMENT
SITE: 881 Duane Avenue
NRS-KRS 11 SkV Transmission Line Project
Dear Storage Equities, Inc.:

The City of Santa Clara, acting by and tlrrough its municipally owned utility, Silicon Valley Power (SVP), is currently pursuing acquisition of power line easements to construct, operate, and maintain approximately 2.24 miles of new 115 kilovolt (kV) overhead transmission line from the N01ihem Receiving Station (NRS) to Kifer Receiving Station (KRS) ("Project"). The power lines that are proposed to be built for the Project requires the acquisition of property rights affecting approximately 7,000 square feet over a portion of your property located at 881 Duane Avenue, Santa Clara, CA and is also identified by the County Assessor as Parcel No. 224-36-039 ("Property").

SVP's primary objective of the Project is to increase system capacity and reliability. The majority of the new 115k V transmission line would be constructed along Lafayette Street, Bassett Street, and Duane A venue. The Project is anticipated to be completed in 2028.

SVP designs its transmission system so that a loss of a single transmission line does not result in the loss of power for its customers. This design philosophy ensures the maximum reliability for its customers. As the power demands of the City grow, so does the necessity to construct infrastructure upgrades, such as this project, to continue to maintain this level of service reliability and increase the power capacity to support load growth and development. SVP is proactive about addressing future reliability issues and committed to providing the best service reliability for its customers.

Our title information shows Storage Equities, Inc., a California corporation to be the owner of the Property. This Property is within the Project area.

Subject to~ and upon the terms and conditions set forth herein, SVP offers to purchase the easement area over the Property ("Easement Area"), as described in Exhibit A: Overhead Electric Easement Deed ("Easement Deed") attached hereto. SVP hereby offers the sum of One Hundred Seventy Five Thousand Dollars ($175,000) as just compensation for the acquisition of the Easement Area.
~ !LICON
'V"VALLEY
POWER. CITY OF SANTA CLARA
~ The Center of What'& Possible
It is the policy of SVP to acquire property interests that are in private interests through voluntary purchase, if possible, and only when it is necessary to do so. In accordance with applicable law, SVP has obtained, reviewed and approved an appraisal to establish the fair market value of the property to be acquired. 1be attached Appraisal Summary outlines the basis for this offer pursuant to Government Code §7267.2.

Pursuant to Code of Civil Procedure §1263.025, SVP offers to pay your reasonable costs up to five thousand dollars ($5,000) for an independent appraisal of the property interests. By law, an appraiser licensed by the Office of Real Estate Appraisers must prepare the independent appraisal.

Although you are not required to obtain an appraisal at this time, or at all, if you believe such appraisal can assist you in evaluating this offer, it is in your interest to obtain an independent appraisal as expeditiously as possible. If you choose to obtain an appraisal, please forward SVP an invoice from your appraiser, identifying the Easement Area and the Property address as the subject of the appraisal and the fee charged.

Materials enclosed for your information include:
• An Easement Deed with Exhibit showing the Easement Area; • The Appraisal Summary for your Easement Area,
The agent assigned to you and to whom you will be working with is John Timmins who can be reached at 801-244-3707 or by email [email protected]. Please contact him if you have any questions or if you wish further clarification of this offer.

If you are agreeable to the purchase amount of this offer for the Easement Area, please indicate your acceptance by signing in the space provided below and return an original signed copy of this letter to John Timmins using the postage paid return envelope, which is enclosed, for your use.

Upon receipt of your acceptance of this purchase off er amount, a contract for sale (Purchase and Sale Agreement) and escrow instructions will be prepared for your execution. SVP will pay all of the conveyance and escrow costs. All taxes and assessments, if any, will be pro-rated, and possession will be delivered to SVP at the close of escrow.

Sincerely,
Manuel Pineda P .E.

Chief Electric Utility Officer
Enclosures:

SVP Easement with Exhibit
Appraisal Summary
Postage paid return envelope

ACCEPTANCE OF OFFER

SILICON
VALLEY
POWER. CITY OF SANTA CLAIIA
~ The Center of What's Possible
I, ___________ _, am the legal owner of the Property. SVP submitted to me an Offer to purchase Overhead Electric Easement dated November 13, 2024 ("Offer") whereby the City of Santa Clara acting by and through its municipally owned utility, Silicon Valley Power, offered $175,000 as the purchase amount for the acquisition of the Easement Area. By signing below I hereby accept this Off er and the terms and
conditions contained therein. I further represent that I am legally authorized to accept the Offer.

Any and all capitalized terms shall have the meaning ascribed to them in the Offer.

Owner's Name
By: _______ _
Name: ---------
Title: ---------
Date: ---------
Recording Requested by:

Office of the City Attorney
City of Santa Clara, California
When Recorded, Mail to:

Office of the City Clerk
City of Santa Clara
1500 Warburton Avenue
Santa Clara, CA 95050
jSPACE ABOVE THIS LINE FOR RECORDER'S USE)
EXEJ\APT FROM RECORDING FEE
PER GOVERNMENT CODE§§ 6103 and 27383

EXEMPT FROM FEE
!'ER GOVF.RNMENTCODE § 27388.1 (a)(2)(D)

OVERHEAD ELECTRIC EASEMENT DEED
881 Duane Avenue & APN 224-36-039
Santa Clara, California
For valuable consideration, the receipt of which is hereby acknowledged, Storage Equities, Inc., a California corporation, (herein "Grantor"), hereby grants to the CITY OF SANTA CLARA, California, a chartered municipal corporation, (herein "Grantee"), an easement and right-of-way (herein "Easement") in, on, over, along and across the real property owned by Grantor in the City of Santa Clara~ State of California, described in Exhibit A attached hereto and incorporated herein by this reference ("Easement Area").

This Easement shall be used by Grantee for the purpose of constructing and reconstructing, installing, operating, inspecting, maintaining, repairing, removing and/or replacing overhead electrical transmission systems, electrical distribution system, and communication systems, and appurtenances thereto, including a reasonable right of ingress and egress over adjoining lands of Grantor. In exercising said right of ingress and egress, Grantee shall, wherever practical, use existing roads and lanes across lands of Grantor, if such there be, and if not, by such route or routes as shall result in the least practicable inconvenience to Grantor and any occupants of Grantor's property.

The overhead system will consist of poles, wire supports, wires and conductors suspended from pole to pole, transformers and other equipment mounted on the poles, anchors, guy attachments, and other appurtenances.

Portions of the Easement Area may be used by the Granter for driveway(s), landscaping (excluding trees), and parking, as will not interfere with the Grantee's use of the Easement. Any other use of the Easement Area by Grantor shall be subject to Grantee's express written consent and only after Grantee's review of plans and specifications and determination that such use will not interfere with its use of the Easement. Grantee may trim any trees or remove any tree or structure which is in or adjacent to the Easement Area which, in its reasonable determination, interferes with its use of the Easement. Grantee may trim any trees which is in or adjacent to the Easement Arca which exceeds a height of 20 Feet or poses a risk of falling onto the Grantee's facilities or equipment located within the Easement.
[SIGNATURE(S) APPEAR ON THE FOLLOWING PAGE]

Page 1 of 2 ends