Cities Index.
Agenda packet, regular meeting

Ukiah City Council
April 19, 2023

Document
Agenda packet, regular meeting
Meeting
April 19, 2023
Body
Ukiah City Council
Pages
1,800
Original file
268.8 MB
Text extracted from the city's file for reading and search. Open the original on ukiahca.api.civicclerk.com. That file is the official record.

EC
EC
EC
EC
EC
EC
EC
EC
EC
Plot Date: 4/7/2023 9:49:49 AM

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
PROJECT NO. LAST SAVED BY: FILE NAME:

CDA
JRD
JM
00C03
22 CIVIL

WWTP SITE PLAN
8660F1000C03.dwg JDiDonato 8660F10
FILE:

PLAN
8660F10C04

DIGESTER
NO. 1

DIGESTER
NO. 2
SLUDGE

DE-WATERING

FACILITY

NORTH POND MIDDLE POND

BACKWASH

PUMP STATION

TRUCK FILL HYDRANT
(PHASE 3) TO BE REMOVED

AND REPLACED DURING

POND CONSTRUCTION

SOUTH POND
EX 12" SL

EXISTING

DREDGE LINE
2 1
EX 6" SL
6" SL
KEY NOTES:

1. PRIOR TO INSTALLING THE NEW 6" SLUDGE PIPE,

CONTRACTOR SHALL FIELD VERIFY THE

LOCATION, CONDITION, MATERIAL, OUTSIDE
DIAMETER OF THE EXISTING 6" SLUDGE LINE
(APPROXIMATELY 4 FEET BELOW GRADE), AND
NOTIFY THE ENGINEER. USE
FITTINGS/COUPLINGS AS REQUIRED.

2. PRIOR TO INSTALLING THE NEW 6" SLUDGE PIPE,

CONTRACTOR SHALL FIELD VERIFY THE

LOCATION, CONDITION, MATERIAL, OUTSIDE
DIAMETER OF THE EXISTING 12" SLUDGE LINE
(APPROXIMATELY 4 FEET BELOW GRADE), AND
NOTIFY THE ENGINEER. USE
FITTINGS/COUPLINGS AS REQUIRED.

GENERAL NOTES:

1. THE LOCATIONS OF UTILITIES SHOWN ARE
APPROXIMATE. CONTRACTOR IS RESPONSIBLE

FOR FIELD VERIFICATION OF ALL RELEVANT
EXISTING UTILITIES.

X
SCALE
0 20' 40' 80'
SCALE: 1" = 40'
Know what's below.

Callbefore you dig.

Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.10 09:13:56-07'00'

Page 261 of 1800 ends

EC

G G G G G G G G G G G G G G G G G G G G G G

G G G G G G G G

G G G G G G
570
570
580
580
BP STA 10+00.00
N=2169003.65
E=6223990.95
PC STA 10+09.50
N=2169013.10
E=6223989.90
PC STA 14+96.39
N=2168995.80
E=6223521.77
PC STA 17+98.87
N=2168731.45
E=6223546.43
PC STA 22+34.39
N=2168726.04
E=6223965.35
PT STA 10+63.71
N=2169043.59
E=6223951.80
PT STA 15+95.02
N=2168922.96
E=6223476.59
PT STA 18+69.94
N=2168695.81
E=6223602.15
PT STA 23+21.48
N=2168786.35
E=6224014.99
10+00
11+00
11+00
12+00
13+00
14+00
15+00
16+00
17+00
18+00
19+00
20+00
21+00
22+00
23+00
24+00
25+00
STA 24+97.86
OFFSET=12.26' L
NORTHING=2168960.31
EASTING=6223983.41
581.00 FG GB
STA 23+92.53
OFFSET=42.83' L
NORTHING=2168852.26
EASTING=6223964.60
570.95 FG GB
3:1
3:1
3:1
3:1
3:1
3:1
3:1

9.3%
3:1
3:1
3:1
3:1
3:1
3:1
575
580
572 573 574
576 577 578 579
581
575
580
573
574
576
577
578
579
581
575
580
580
572
573
574
576
576
577
577
578
578
579
579
581
581
580
576
577
578
579
581
570
575
571
571
571
572
572
572
573
574
576
577
580
577
578
579
581
575 576 577 578
571
Plot Date: 4/7/2023 9:32:31 AM
SCALE

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
PROJECT NO. LAST SAVED BY: FILE NAME:

CDA
OV
BWA
91C01
23 CIVIL

PAU GRADING PLAN
8660F1091C01.dwg atucker 8660F10
FILE:

PLAN
8660F10C04
0 15' 30' 60'
SCALE: 1" = 30'
Know what's below.

Callbefore you dig.

KEY NOTES:

1. FINISHED GRADE OF THE BOTTOM OF THE PAU

SHALL BE SLOPED FROM THE TOE OF THE SLOPE
TO THE PUMP STATION INLET.

2. RECYCLED WATER INFRASTRUCTURE SHALL
REMAIN IN SERVICE DURING CONSTRUCTION.

PROTECT IN PLACE.

3. REFER TO SHEET 91C07 FOR PAU INLET PIPING
ALIGNMENT AND PROFILE.

4. REFER TO SHEET 91C08 FOR PAU OUTLET PIPING
ALIGNMENT AND PROFILE.

5. REFER TO SHEET 91S04 FOR PAU INLET
STRUCTURE.

6. ACCESS ROAD ON TOP OF BERM SHALL CONSIST
OF 6-INCHES AB OVER GEOTEXTILE FABRIC WITH
1-FOOT SUBGRADE AT 95% RC UNLESS
OTHERWISE NOTED. ACCESS ROAD TO BE SEALED

IN ACCORDANCE WITH SPECIFICATION SECTION
02747.

7. THE CONTRACTOR SHALL DECOMMISSION THE

EXISTING BURIED ELECTRIC UTILITY BEFORE PAU
CONSTRUCTION. REFER TO SPECIFICATION
SECTION 01140 FOR WORK RESTRICTIONS. THE

CONTRACTOR SHALL REESTABLISH THE BURIED

ELECTRIC UTILITY AS SHOWN ON THE ELECTRIC
SITE PLAN. REFER TO DWG 01E02.

8. 8" THICK SLAB ON GRADE WITH #5@12" O.C. EACH
WAY. REFER TO DETAIL 5/91C04.

9. 8" THICK SLOPED SLAB ON GRADE (WALL) WITH
#5@12" O.C. EACH WAY. REFER TO DETAIL 5/91C04
AND DETAIL 7/91C04.

10. CONSTRUCTION JOINTS IN SLAB ON GRADE
SPACED AT MAXIMUM 20'-0" O.C. IN EACH
DIRECTION. THE JOINTS SHALL AS PER TYPICAL
DETAIL S110 WITH WATER STOP AND EXTEND
THROUGH THE SLOPED SLAB ON GRADE (WALL).

11. EXPANSION JOINT PER DETAIL 6 /91C04 TYPICAL
ALL AROUND THE BASIN.

12. TOP OF THE BERM CONCRETE LINER DETAIL PER
DETAIL 7/91C04 TYPICAL ALL AROUND THE BASIN.

13. ADJUST CONSTRUCTION JOINT LOCATION TO
ACCOMMODATE INLET STRUCTURES.

GENERAL NOTES:

1. CONTRACTOR TO VERIFY THE HORIZONTAL AND

VERTICAL LOCATIONS OF ALL EXISTING UTILITIES

PRIOR TO THE START OF CONSTRUCTION AND

NOTIFY THE ENGINEER OF ANY DISCREPANCIES
OR CONFLICTS.

2. CLEAR, GRUB, AND STRIP CONSTRUCTION AREAS

PRIOR TO EARTHWORK ACTIVITIES PER
SPECIFICATION SECTION 02200.

3. REFER TO SPECIFICATION SECTION 02300 AND
02301 FOR EARTHWORK AND BACKFILL
REQUIREMENTS.

4. THE CONTRACTOR SHALL REMOVE ALL EXISTING
SLUDGE MATERIAL. THE SLUDGE MATERIALS

SHALL BE REMOVED TO AN APPROXIMATE
ELEVATION OF 567 FEET.

X
16" RW 30" RW
16" SE

PRODUCTION

AUGMENTATION UNIT

RW METER
VAULT
(PHASE 3)
TO PHASE 3

DISTRIBUTION SYSTEM

TOP OF BERM

PAU PUMP STATION

INLET INVERT
ELEVATION = 570.0
12" SE
1 TOE OF
SLOPE

CAUTION HIGH

PRESSURE GAS PIPELINE

TOE OF SLOPE
2 2

TOE OF SLOPE
3 4
1 91C03
D
91C02
E
91C02
A
91C02
13'
13'
13'
C
91C02
B
91C02
13'

TOE OF SLOPE
CUT: 31974 CUBIC YARDS
FILL: 2747 CUBIC YARDS
91C06
A

EX SLUDGE

DEWATERING

FACILITY

EX CHLORINE

CONTACT BASINS
LEGEND:

CONCRETE BASIN DESIGN PER 91C03
EX

OPERATIONS

BUILDING

PAU INLET PIPING
INVERT ELEVATION =
570.78

TOE OF SLOPE
ELEVATION = 571.28

TOE OF SLOPE
ELEVATION = 571.40

TOE OF SLOPE
TOE OF SLOPE ELEVATION = 571.24
ELEVATION = 571.37

TOE OF SLOPE
ELEVATION = 571.63

TOE OF SLOPE
ELEVATION = 571.47

TOE OF SLOPE
ELEVATION = 571.47

TOE OF SLOPE
ELEVATION = 571.12

FUTURE CHLORINE CONTACT BASIN

EX CAROUSEL

PUMP STATION

EX BACKWASH

PUMP STATION
6 7
8 9
10 11
12 13
13 TYP
CF161
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.10 09:14:11-07'00'

Page 262 of 1800 ends

560
565
570
575
580
585
590
560
565
570
575
580
585
590
9+60 10+00 11+00 12+00

0.0%

0.0%
STA 10+00.00

BEGIN ACCESS RAMP
FG 581.00
STA 10+43.99OFFSET =12.26' LFG 581.00
STA 11+51.73
OFFSET 34.43' LFG 570.95
FG @

CENTERLINE

APPROX EXIST
GROUND @

CENTERLINE
-9.3%
565

GROUND WATER ELEV
13'

FG ELEV
571.37

TOP OF BERM
FG ELEV 581.00
3:1
579
FG @ CENTERLINE

APPROX EXIST
GROUND @ CENTERLINE
565

GROUND WATER ELEV
3:1

APPROX EXIST
GROUND @ CENTERLINE
13'

APPROX EXIST
GROUND @ CENTERLINE
FG @ CENTERLINE

FG ELEV
571.12

TOP OF BERM
FG ELEV 581.00
579
3:1

PREVENT RUNOFF FROM

COLLECTING AT THE TOE

OF THE SLOPE (TYP)

OUTER SLOPE OF BERM
TO BE MINIMUM 3H:1V.

REGRADE AS REQUIRED
565

GROUND WATER ELEV
-120-100
13'

FG ELEV
571.47

TOP OF BERM
FG ELEV 581.00
579
565

GROUND WATER ELEV
FG @ CENTERLINE
3:1
3:1

APPROX EXIST
GROUND @ CENTERLINE
13'

FG ELEV
571.28

TOP OF BERM
FG ELEV 581.00
-120-100
579
565

GROUND WATER ELEV
3:1
3:1
FG @ CENTERLINE

APPROX EXIST
GROUND @ CENTERLINE
Plot Date: 4/7/2023 9:50:32 AM
SCALE

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
PROJECT NO. LAST SAVED BY: FILE NAME:

CDA
JRD
JM
91C02
24 CIVIL
PAU

PROFILE AND SECTIONS
8660F1091C02.dwg JDiDonato 8660F10
Know what's below.

Callbefore you dig.

FILE:

A PROFILE
91C01

POND ACESS RAMP
POND AWT STORAGE.dwg
SCALE:

FILE:

B SECTION
91C01 AS NOTED
POND AWT STORAGE.dwg
BERM SECTION STA 14+25
(HORIZ)
0 5' 10' 20'
SCALE: 1" = 10'
0 25' 50' 100'
SCALE: 1" = 50'
(VERT)
SCALE:

FILE:

C SECTION
91C01 AS NOTED
POND AWT STORAGE.dwg
BERM SECTION STA 16+50
SCALE:

FILE:

D SECTION
91C01 AS NOTED
POND AWT STORAGE.dwg
BERM SECTION STA 19+50
SCALE:

FILE:

E SECTION
91C01 AS NOTED
POND AWT STORAGE.dwg
BERM SECTION ST 23+60
GENERAL NOTES:

1. CONTRACTOR TO VERIFY THE HORIZONTAL AND

VERTICAL LOCATIONS OF ALL EXISTING UTILITIES

PRIOR TO THE START OF CONSTRUCTION AND

NOTIFY THE ENGINEER OF ANY DISCREPANCIES
OR CONFLICTS.

2. PAU TO BE CONSTRUCTED PER SPECIFICATION
SECTIONS 02300 AND 02301.

3. CLEAR, GRUB, AND STRIP CONSTRUCTION AREAS

PRIOR TO EARTHWORK ACTIVITIES PER
SPECIFICATION SECTION 02200.

4. ACCESS ROAD ON TOP OF BERM SHALL CONSIST
OF 6-INCH AB OVER GEOTEXTILE FABRIC WITH
1-FOOT SUBGRADE AT 95% RC UNLESS
OTHERWISE NOTED. ACCESS ROAD TO BE

SEALED IN ACCORDANCE WITH SPECIFICATION
SECTION 02747.

5. UNPAVED AREAS OUTSIDE OF CONCRETE BASIN

OR ACCESS ROAD SHALL BE GRADED TO MEET

EXISTING GRADE, COMPACTED, AND RESEEDED
PER SPECIFICATION SECTION 02939.

6. THE CROSS-SECTIONS ON THIS SHEET ONLY
DEPICT EXISTING AND FINAL ELEVATIONS. REFER
TO DRAWING 91C03 FOR CONCRETE BASIN

DETAILS AND SUB-GRADE PREPARATION
REQUIREMENTS.

Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.10 09:14:26-07'00'

Page 263 of 1800 ends

KEY NOTES:

1. EXTEND OVER EXCAVATION 5 FT LATERALLLY
BEYOND THE EDGE OF THE BASIN BOTTOM.

2. SLOPE OUTSIDE OF BERM TO MEET EXISTING
GRADE.

3. NATIVE MATERIAL, MINUS ORGANICS, DEBRIS,

AND OTHER DELETERIOUS MATERIALS ARE

SUITABLE FOR ENGINEERED FILL IF NOT
EXCEEDING A MAXIMUM PARTICLE SIZE OF 4
INCHES. EXCAVATED MATERIALS UNSUITABLE

FOR USE AS STRUCTURAL FILL CAN BE PLACED

OUTSIDE OF THE STRUCTURE LIMITS, OR
DISPOSED OFF-SITE.

4. BENCH FILL INTO THE EXISTING EMBANKMENT AT
A MINIMUM OF 1'H:1'V OF FILL PLACED, OR AS

NECESSARY TO REMOVE LOOSE MATERIAL AND

PROVIDE PROPER COMPACTION ALONG THE
ZONE OF TRANSITION.

5. IF IMPORTED SOIL IS REQUIRED FOR

CONSTRUCTION DUE TO EXISTING BACKFILL

MATERIAL BEING UNSUITABLE, THE

GEOTECHNICAL ENGINEER MUST REVIEW AND

APPROVE SOILS FOR USE PRIOR TO TRANSPORT
TO THE SITE.

6. BERM TO BE CONSTRUCTED IN ACCORDANCE
WITH SPECIFICATION SECTIONS 02300 AND 02301.

GENERAL NOTES:

1. ACCESS ROAD ON TOP OF BERM SHALL CONSIST
OF 6 INCH AB OVER GEOTEXTILE FABRIC WITH 1 FT
SUBGRADE AT 95% RC UNLESS OTHERWISE
NOTED. ACCESS ROAD TO BE SEALED IN

ACCORDANCE WITH SPECIFICATION SECTION
02747. ALL UNPAVED AREAS WITHIN THE PROJECT

SITE SHALL BE COMPACTED AND RESEEDED PER
SPECIFICATIONS UNLESS OTHERWISE NOTED.

2. UNPAVED AREAS OUTSIDE OF CONCRETE BASIN

OR ACCESS ROAD SHALL BE GRADED TO MEET

EXISTING GRADE, COMPACTED, AND RESEEDED
PER SPECIFICATION SECTION 02939.

3. CLEAR, GRUB, AND STRIP CONSTRUCTION AREAS

PRIOR TO EARTHWORK ACTIVITIES PER
SPECIFICATION SECTION 02200.

X
PROJECT NO.

LAST SAVED BY:

FILE NAME:

Plot Date:

CDA
JRD
BWA
91C03
25 CIVIL
PAU DETAILS 1
8660F1091C03.dwg
JDiDonato
8660F10
9/12/2022 7:29:07 AM

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
Know what's below.

Callbefore you dig.

SCALE:

FILE:
1 DETAIL
- 3/4"=1'-0"
8660F1091C03

TOP OF BERM
SCALE:

FILE:
2 DETAIL
- 3/4"=1'-0"
8660F1091C03

VEHICULAR ACCESS RAMP
SCALE:

FILE:
3 DETAIL
- 3/4"=1'-0"
8660F1091C03

EXCAVATION SECTION
SCALE:

FILE:
4 DETAIL
- 3/4"=1'-0"
8660F1091C03

CONCRETE BASIN SECTION
2% SLOPE
2'-0"
13'-0"
10'-6" 6"
VARIES
SEE SHEET 91C01

SLOPE VARIES
SEE SHEET 91C01
(3:1 MAX)

TOP OF BERM
6" MIN 100% CRUSHED CLASS 2 AGGREGATE
BASE (1 1/2") COMPLACT WITH VIBRATORY
DRUM TO 95% R.C., ACCESS ROAD TO BE
SEALED IN ACCORDANCE WITH SECTION 02747

CONCRETE LINER INSTALLED
PER DETAIL 5/91C04

BACKFILL STABILIZED AND
COMPACTED IN 8 INCH LIFTS
PER SECTION 02300 3:1
3:1

CONCRETE LINER INSTALLED
PER DETAIL 5/91C04

CONCRETE RAMP
6 91C04
8 91C04
3:1
#5@12" O.C. BOTH WAYS
@ MIDDLE SLAB (TYP)
5 91C04
(TYP)

EX TOP OF BERM
(EL 581)

NATIVE MATERIAL BERM

PROPOSED BASIN AREA

LIMIT OF OVER EXCAVATION
(EL 566)
FG EL 570
5'-0" 5'-0"
1 1

OVER EXCAVATE TO REMOVE

ALL SLUDGE SEDIMENTS FROM

EXISTING BASIN

NATIVE MATERIAL BERM

EX TOP OF BERM
(EL 581)

TOP OF BERM
(FG EL 581)
3:1
3:1
6 91C04
10'-6"

OVERBUILD BERM AND

CUT BACK TO NEAT LINES
4 CONCRETE LINER INSTALLED
PER DETAIL 5/91C04

FINISHED GRADE
PER SHEET 91C01

TOP OF BERM
(FG EL 581)
6 NATIVE MATERIAL BERM. CONSTRUCT BERM IN
8" LOOSE LIFTS COMPACTED TO 90% RC
3 2

ACCESS ROAD FILL

AGGREGATE BASE
LEGEND:

CONCRETE

EXISTING BACKFILL
12'-0"
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.10 09:14:41-07'00'

Page 264 of 1800 ends

GENERAL NOTES:

1. ACCESS ROAD ON TOP OF BERM SHALL CONSIST
OF 6 INCH AB OVER GEOTEXTILE FABRIC WITH 1 FT
SUBGRADE AT 95% RC UNLESS OTHERWISE
NOTED. ACCESS ROAD TO BE SEALED IN

ACCORDANCE WITH SPECIFICATION SECTION
02747. ALL UNPAVED AREAS WITHIN THE PROJECT

SITE SHALL BE COMPACTED AND RESEEDED PER
SPECIFICATIONS UNLESS OTHERWISE NOTED.

2. UNPAVED AREAS OUTSIDE OF CONCRETE BASIN

OR ACCESS ROAD SHALL BE GRADED TO MEET

EXISTING GRADE, COMPACTED, AND RESEEDED
PER SPECIFICATION SECTION 02939.

3. CLEAR, GRUB, AND STRIP CONSTRUCTION AREAS

PRIOR TO EARTHWORK ACTIVITIES PER
SPECIFICATION SECTION 02200.

PROJECT NO.

LAST SAVED BY:

FILE NAME:

Plot Date:

CDA
JRD
JM
91C04
26 CIVIL
PAU DETAILS 2
8660F1091C04.dwg
atucker
8660F10
9/12/2022 7:29:07 AM

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832

COMPACT AGGREGATE

BASE COURSE
COMPACTED TO 95%
SCALE:

FILE:
5 DETAIL
91C03 1 1/2"=1'-0"
8660F1091C04

CONCRETE PAVEMENT

OVER EXCAVATION AND

COMPACT AS PER

GEOTECHNICAL REPORT
#5@12" EW
5000 PSI CONCRETE

BROOMED FINISH
5 -
8" 6"
5"
(CLR)
(MIN)
1'-0" 8"
8"
#5@12"
(4) #5 CONT (TYP)
5 -
(TYP)
5 -
(TYP)
(TYP)
#5@12" O.C. EA. WAY
2'-0"
10"
8"
1/2" EXPANSION JOINT
PER DETAIL S130/TYP
1/2" EXPANSION JOINT
PER DETAIL S130/TYP
12" LAP

BOTH SIDES
12" LAP

BOTH SIDES
8"
1'-0" 8"
1'-0" 8"
1 1.5
1 1.5
Know what's below.

Callbefore you dig.
10" 10" 10" 10"
1'-0" 8"
(4) #5 CONT (TYP)
#5@12"
SCALE:

FILE:
6 DETAIL
91C03 1 1/2"=1'-0"
8660F1091C04
SCALE:

FILE:
7 DETAIL
91C03 1 1/2"=1'-0"
8660F1091C04
SCALE:

FILE:
8 DETAIL
91C03 1 1/2"=1'-0"
8660F1091C04

AGGREGATE BASE
LEGEND:

CONCRETE

EXISTING BACKFILL
1'-8"
1'-8"
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.10 09:15:08-07'00'

Page 265 of 1800 ends

BP STA 10+00.00
N=2169003.65
E=6223990.95
PC STA 10+09.50
N=2169013.10
E=6223989.90
PC STA 14+96.39
N=2168995.80
E=6223521.77
PC STA 17+98.87
N=2168731.45
E=6223546.43
PC STA 22+34.39
N=2168726.04
E=6223965.35
PT STA 10+63.71
N=2169043.59
E=6223951.80
PT STA 15+95.02
N=2168922.96
E=6223476.59
PT STA 18+69.94
N=2168695.81
E=6223602.15
PT STA 23+21.48
N=2168786.35
E=6224014.99
10+00
11+00
11+00
12+00
13+00
14+00
15+00
16+00
17+00
18+00
19+00
20+00
21+00
22+00
23+00
24+00
25+00
L1
L2
L3
L4
L5
L6
L8
L7
L9
L10
L11
L12
L13
L14
L15
L17 L18
C1
C3
C5
C7
STA 24+97.86
OFFSET=12.26' L
NORTHING=2168960.31
EASTING=6223983.41
581.00 FG GB
STA 23+92.53
OFFSET=42.83' L
NORTHING=2168852.26
EASTING=6223964.60
570.95 FG GB
Curve Table
Curve #
C1
C3
C5
C7
Length

97.48 79.55

40.20 64.42
Radius

61.00 61.00

61.00 41.00
Delta

91.56 74.72

37.76 90.03
Line Table
Line #
L1
L2
L3
L4
L5
L6
L7
L8
L9
L10
L11
L12
L13
L14
L15
L17
L18
Length
210.34

37.34 364.45

43.05 203.84

41.97 134.27

31.23 96.77

39.31 96.77

25.16 5.85

3.52 16.59

14.93 87.28
Direction
N6° 18' 52.04"W
S16° 34' 28.96"W
N85° 14' 31.97"E
S6° 18' 52.04"E
S20° 02' 13.69"E
N5° 53' 12.34"E
S83° 39' 30.43"W
N38° 25' 10.85"W
S9° 52' 16.31"W
N85° 14' 31.97"E
N9° 52' 16.31"E
N6° 17' 51.03"W
N6° 18' 52.04"W
S78° 13' 05.23"W
S57° 44' 59.02"W
N85° 14' 31.97"E
N85° 14' 31.97"E
Plot Date: 4/6/2023 1:19:07 PM
SCALE

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
PROJECT NO. LAST SAVED BY: FILE NAME:

CDA
JRD
JM
91C05
27 CIVIL

PAU SURVEY CONTROL PLAN
8660F1091C05.dwg atucker 8660F10
FILE:

PLAN
8660F10C04
0 15' 30' 60'
SCALE: 1" = 30'
Know what's below.

Callbefore you dig.

KEY NOTES:

1. LIMIT OF GRADING SHOWN. THE BERM OUTSIDE

OF THE ACCESS ROAD SHOULD BE SLOPED AT
1V:3H TO MEET THE EXISTING GRADE. REFER
TO DRAWING 91C04 FOR TYPICAL BERM
DETAILS.

2. REFER TO DRAWING 91C06 FOR PUMP STATION
AND INLET LOCATIONS.

3. REFER TO DRAWING 91C07 FOR PUMP STATION
AND INLET LOCATIONS.

GENERAL NOTES:

1. REFER TO 91C01 FOR PAU GRADING PLAN.

2. THE PLAN DEPICTS FINISHED GRADE AND
DIMENSIONS. REFER TO 91C04 FOR CONCRETE
BASIN AND SUBGRADE DESIGN DETAILS.

X
TOE OF
SLOPE

TOE OF SLOPE

TOE OF SLOPE
2 3
1 1
1 Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.10 09:15:23-07'00'

Page 266 of 1800 ends

L14
N=2168986.26
E=6223803.26
N=2168993.39
E=6223794.92
N=2169020.80
E=6223799.44
N=2169035.82
E=6223789.73
575
580
571
572
573
574
576
577
578
579
Plot Date: 4/6/2023 9:47:21 AM
SCALE

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
PROJECT NO. LAST SAVED BY: FILE NAME:

CDA
JRD
BWA
91C06
28 CIVIL

PAU PUMP STATION PLAN
8660F1091C06.dwg atucker 8660F10
0 2.5' 5' 10'
SCALE: 1" = 5'
Know what's below.

Callbefore you dig.

GENERAL NOTES:

1. REFER TO DRAWING 91S01 FOR PUMP STATION
DIMENSIONS.

SCALE:

FILE:

PLAN
SITE
8660F1073C0801
A 1" = 5'
1 91S03
16" INLET FROM PAU

TO CHLORINATION

STRUCTURE, SEE
DWG 91C08 FOR

CONTINUATION

PRODUCTION

AUGMENTATION UNIT

PAU PUMP

STATION

PAU PUMP STATION

INLET STRUCTURE
LEGEND:

CONCRETE BASIN DESIGN PER 91C03
A
91M01
A/B
91S01
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.10 09:15:48-07'00'

Page 267 of 1800 ends

570
580
580
11+75.22
10+00
11+00
STA. 10+22.82
N=2169077.31
E=6224077.77
Δ=90°00'00" LT
EC
11+75.22
10+00
11+00
571.0
STA. 10+93.06
N=2169071.28
E=6224007.79
Δ=45°00'00" RT
STA. 10+04.73
N=2169095.34
E=6224076.24
STA. 11+75.22
N=2169008.41
E=6223954.90
16" PAU INLET
556
560
564
568
572
576
580
584
588
556
560
564
568
572
576
580
584
588
9+50 10+00 11+00 12+00 13+00 STA=10+12 16" 90° BEND INV = 575.95

PROPOSED

PAU BERM
STA=10+12
16" 90° BEND
INV=581.66
DIP
PVC
TYP
CY111
30" RW
TOP=568.78
16" RW
TOP=569.48
36" x 30" CULVERT
TOP=572.06
36" x 30" CULVERT
TOP=571.95
STA:11+75.22

PAU INLET
INV=570.78
165 LF OF 16' PVC DR 18

RESTRAINED JOINTS REQ'D
STA:10+04.73
INV=581.83
STA=10+07.20
16" BFV
INV=581.83

EXISTING GRADE

PAU INLET
STA=10+22.82
16" 90° BEND
INV = 575.95
STA=10+93.06
STA=11+32.56
16" 45° BEND
INV = 575.95
STA=11+40.53
16" 45° BEND
INV = 568.45
16" 45° BEND
INV = 575.95
Plot Date: 4/6/2023 11:14:18 AM
SCALE

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
PROJECT NO. LAST SAVED BY: FILE NAME:

CDA
JRD
JM
91C07
29 CIVIL

PLAN AND PROFILE

PAU INLET YARD PIPING
8660F1091C07.dwg JDiDonato 8660F10
Know what's below.

Callbefore you dig.

KEY NOTES:

1. CROSSING DEPTH UNKNOWN. CONTRACTOR TO
VERIFY PRIOR TO EXCAVATION.

2. REFER TO DRAWING 89M01 FOR CONTINUATION
AND CONNECTION TO PUMP STATION.

GENERAL NOTES:

1. CONTRACTOR TO VERIFY ALL CROSSINGS PRIOR
TO CONSTRUCTION.

X
(HORIZ)
0 5' 10' 20'
SCALE: 1" = 10'
0 10' 20' 40'
SCALE: 1" = 20'
(VERT)
1 2
16" RW
30" RW
42" FE
36" FE

EX CULVERT
FILE:

PLAN
8660F1073C0801
FILE:

PROFILE
8660F1073C0801

EX DECHLORINATION

STRUCTURE

EX CAROUSEL

PUMP STATION
1 1 1

EX CHLORINE

CONTACT BASINS
FUTURE

CHLORINE

CONTACT BASIN
95S01
H
2 Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.10 09:16:08-07'00'

Page 268 of 1800 ends

L7
L14
580
EC
EC
EC
EC
EC
EC
EC
13+93.35
10+00
11+00
12+00
13+00
STA. 11+21.22
N=2169159.94
E=6223780.02
Δ=45°00'00" RT
STA. 13+78.35
N=2169405.53
E=6223769.41
Δ=90° LT
STA. 11+56.26
N=2169187.03
E=6223802.25
Δ=45°00'00" LT
STA. 13+33.12
N=2169360.93
E= 6223785.66
Δ=11.25° LT
9+74 10+00
11+00
12+00
13+00
13+93.35
STA. 10+02.00
N=2169041.44
E=6223793.13
556
560
564
568
572
576
580
584
588
592
556
560
564
568
572
576
580
584
588
592
9+50 10+00 11+00 12+00 13+00 14+00 14+50 STA=10+02 INV - 570.20 12" EX UTILITY TOP=575.50 6" DRAIN TOP=572.61 2" EX UTILITY TOP=575.50 2" EX UTILITY TOP=575.50 4" SW TOP=575.19 14" BW TOP=573.69 24" FE TOP=576.03 4" DR TOP=574.92

EXISTING GRADE
STA=11+06.79
10" 45° BEND
INV = 566.68
TYP
CY111
STA=13+93.69

CONNECTION TOCHLORINATION FAC
INV = 571.00
42" SE
TOP = 568.00
24" WWTOP = 571.00
42" SCE
TOP = 568.00
394 LF OF 10" PVC DR 18

RESTRAINED JOINTS REQ'D

EXISTING

CHLORINATION

FACILITY
STA=13+33.12
10" 11.25° BEND
INV = 573.50
STA=13+78.35
10" 90° BEND ROLLED 45°
INV = 573.50

PAU PUMP

STATION
EX 12" UNK
INV=573.5±
EX 12" UNK
INV=573.6±
EX 12" UNK
INV=573.5±
EX 12" UNK
INV=573.4±
EX 12" UNK
INV=573.6±
2'X1.5' DUCTBANK
INV=573.3±

DUCT BANK (ASSUMED)
TOP=574.56
12" EX UTILITY
TOP=574.21
STA:13+02.00
10" BFV
INV=571.42
STA:13+22.00
10" CHECK VALVE
INV=571.47
STA=11+03.06
10" 45° BEND
INV = 570.20
STA=11+06.79
10" 45° BEND
INV = 566.68
STA=11+21.22
10" 45° BEND
INV = 566.68
STA=11+56.26
10" 45° BEND
INV = 566.68
STA=12+01.46
10" 45° BEND
INV = 566.66
STA=12+06
10" 45° BEND
INV = 571.19
Plot Date: 4/7/2023 9:33:50 AM
SCALE

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
PROJECT NO. LAST SAVED BY: FILE NAME:

CDA
JDM
JM
91C08
30 CIVIL

PLAN AND PROFILE

PAU OUTLET YARD PIPING
8660F1091C08.dwg atucker 8660F10
Know what's below.

Callbefore you dig.

KEY NOTES:

1. REFER TO DRAWING 91M01 FOR CONTINUATION
AND CONNECTION TO PUMP STATION.

2. SEE DETAIL P300/TYP FOR CONNECTION TO
EXISTING WET WELL. CONTRACTOR TO VERIFY

CONNECTION POINT AND SUPPORT ADJACENT
YARD PIPING WHILE EXCAVATING. CONNECTION

LOCATION SHOULD NOT INTERFERE WITH
EXISTING EFFLUENT FLOW TRANSMITTER.

3. CROSSING DEPTH UNKNOWN. CONTRACTOR TO
VERIFY PRIOR TO EXCAVATION.

GENERAL NOTES:

1. CONTRACTOR TO VERIFY ALL UTILITY OR PIPE
CROSSINGS PRIOR TO CONSTRUCTION.

X
(HORIZ)
0 2' 4' 8'
SCALE: 1" = 4'
0 10' 20' 40'
SCALE: 1" = 20'
(VERT)
1 2
STA. 13+93.65
N=2169400.29
E=6223755.35

CONNECTION TO

CHLORINATION FACILITY

EX STORM DRAIN PUMP

STATION (ABANDONED)
EX 4" RCW
EX 24" FE
EX 14" BW
(ABANDONED)
EX 4" FW

PAU PUMP

STATION INLET

EX BACKWASH

PUMP STATION

EX CHLORINE

CONTACT BASINS
EX 24" FE

EX DAFT BUILDING

EX CHEMICAL STORAGE
EX 42" SE
EX 24" WW

EX RECLAIMED

WATER FILTERS

EX AWT WET WELL

EX AWT FACILITY

PAU PUMP STATION
FILE:

PLAN
8660F1073C0801
FILE:

PROFILE
8660F1073C0801

EX CHLORINATION

FACILITY
TYP
MP532
(TYP)
3 3
3 3
91S03
E
1 2
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.10 09:16:23-07'00'

Page 269 of 1800 ends

580
584
588
592
596
600
604
608
612
580
584
588
592
596
600
604
608
612
A9+00 A10+00 A11+00 A12+00 A13+00 A14+00 A15+00 A16+00 A17+00 A18+00 A19+00

EXISTING GRADE
STA A10+18.60
INV=593.82
18" 22.5° BEND
STA A10+63.72
INV=590.91
18" 90° VERT BEND
STA A13+00.61
INV=596.62
18" 90° VERT BEND
STA A13+00.61
INV=590.91
18" 90° VERT BEND
EX 6" W
INV=599.3±

EX W
INV=600.6±
EX 6" SS
INV=593.8±
STA B10+62.22
CARV
STA A12+95.60

BLOW OFF
M-28
STA A10+05.00

METER TAP
STA A10+15.39
INV=593.90
18" X 16" RED
STA A17+76.16
INV=598.11
STA A10+63.72
INV=596.52
18" 90° VERT BEND
18" RW
STA A10+02.50
CARV
EX 16" RW
STA=A10+09.83
16" BFV
STA A10+14.54

METER TAP
STA=A13+10.84
18" BFV
S=-6.27%
S=-1.01%
S=-0.50%
S=-0.09%
STA A13+04.68CARV
STA A13+29.02
INV=596.61
18" 45° BEND
STA A13+72.15
INV=596.61
18" 45° BEND
EX 21" SS
INV=592.6±
STA A13+98.58
INV=596.60
18" 45° BEND
STA A15+28.29
INV=597.89

STATE (CALTRANS) ROW
227 LF OF 30" STEEL CASING
INSTALL 227 LF OF FPVC DR 18 INSTALL 318 LF OF FPVC DR 18 INSTALL 288 LF OF 18" PVC DR18 TYP
CY165
TYP
CY111
TYP
CY111
STA A10+00.00STA A16+12.00
EX 21" SS EX 15" SS
EX 18" W

EX T

EX E

EX OHW
EX 16" W

EX W
18" RW
STA A10+18.60
N=2186266.20
E=6222080.74
18" 22.5° BEND
STA A10+63.72
N=2186261.41
E=6222035.87
2-18" 90° VERT BEND
STA A13+00.61
N=2186263.25
E=6221798.99
2- 18" 90° VERT BEND
STA A13+29.02
N=2186283.34
E=6221778.91
18" 45° BEND
STA A13+72.15
N=2186283.34
E=6221735.78
18" 45° BEND
STA A13+98.58
N=2186302.04
E=6221717.09
18" 45° BEND
16" RW
STA A10+15.39
N=2186267.74
E=6222083.56
18" X 16" RED

EX OHW
A10+00
A11+00 A12+00
A13+00
A14+00
A15+00 A16+00 A17+00 A18+00 A19+00
STA A10+00
N=2186274.93
E=6222097.17
16" 90° BEND

LIVE OAK AVE

N BUSH ST

LOW GAP RD

LOW GAP RD
Plot Date: 4/7/2023 9:34:29 AM
SCALE

KEY MAP
PROJECT NO. LAST SAVED BY: FILE NAME:

CDA
BH
JM
99C01
31 CIVIL

PLAN AND PROFILE ALIGNMENT A
STA A09+40 TO A19+00
8660F1099C01.dwg JDiDonato 8660F10
4 REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832

THIS SHEET
Know what's below.

Callbefore you dig.

BRU

BRUSH STREET
STATE HIGHWAY 101

REMOVE EX
16" RW LINE

RECEIVING PIT

JACKING PIT
TYP
CY745
3 5 1 1
2 PROPOSED METER

SERVICE LINE
REMOVE EX. CARV
3 WATER METER M-28
CARV
16" BFV
TYP
CY715
TYP
CARV CY745
TYP
CY745 CARV

BLOW OFF
TYP
CY733
TYP
18" BFV CY715
1 6
KEY NOTES:

1. VERTICAL BEND ACHIEVED BY PULLING JOINTS IN
PIPE. MAXIMUM ALLOWED DEFLECTION IS HALF

OF THE MANUFACTURER'S SPECIFIED

DEFLECTION CONTRACTOR MAY DEFLECT MORE

THAN ONE JOINT TO ACHIEVE TOTAL
DEFLECTION.

2. HORIZONTAL ALIGNMENT CHANGE ACHIEVED BY
ROTATING VERTICAL 90 DEGREE BEND 45

DEGREES

3. EXISTING WATER METER INSTALLED AS PART OF
PHASE 3 SCOPE, SHALL BE REUSED AND
REINSTALLED DURING PHASE 4 CONSTRUCTION.

4. MAINTAIN MINIMUM 12 FT CLEARANCE BETWEEN
GRADE AND TOP OF CASING.

5. VERTICAL BEND ACHIEVED BY ROLLING
HORIZONTAL BEND 8.7 DEGREES.

6. HORIZONTAL ALIGNMENT CHANGE ACHIEVED BY
ROTATING VERTICAL 90 DEGREE BEND 6.5
DEGREES.

GENERAL NOTES:

1. SEE RECYCLED WATER PROJECT PHASE 1 TO 3
PLANS FOR EXISTING RW PIPE ALIGNMENT.

2. CONTRACTOR TO DETERMINE FINAL LAUNCHING
AND RECEIVING PIT SIZE.

3. CONTRACTOR TO VERIFY ALL UTILITY CROSSINGS
PRIOR TO CONSTRUCTION.

4. CONTRACTOR TO ASSUME THAT ANY VERTICAL

BENDS SHOWN ON THE PLANS ARE ROTATED

FROM THE CORRESPONDING HORIZONTAL BENDS
UNLESS NOTED OTHERWISE.

INSTALL 16 LF OF 16"
FPVC DR 18
INSTALL 51 LF OF 18" FPVC DR 18

N ORCHARD AVE
MATCH LINE STA A19+00 SEE DWG 99C02
TYP
CY111
TYP
CY165
TYP
CY111
FILE:

PLAN
8660F1001C102

PROFILE
FILE: 8660F1001C102
(HORIZ)
0 2' 4' 8'
SCALE: 1" = 4'
0 20' 40' 80'
SCALE: 1" = 40'
(VERT)

KEY MAP
NORTH
#
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.10 09:07:22-07'00'

Page 270 of 1800 ends

EX 15" SS
A19+00 A20+00 A21+00 A22+00
A23+00
A24+00 A25+00 A26+00 A27+00
A28+00 A29+00
EX 15" SS
EX 12" W

EX W EX OHW

EX W
EX 6" SS

EX G

EX OHW

EX OHW

EX OHW

EX W

EX W
EX 15" SS EX OHW
EX 16" W

EX OHW
EX 6" SS

EX W
EX 16" W
STA A22+90.95
N=2186305.00
E=6220826.65
18" 45° BEND
STA A22+84.34
N=2186300.33
E=6220831.34
18" 45° BEND
STA A27+73.29
N=2186304.07
E=6220344.32
18" 22.5° BEND
STA A27+88.13
N=2186298.36
E=6220330.61
18" 22.5° BEND
18'' RW
TYP
CARV CY745

LIVE OAK AVE

N BUSH ST

LOW GAP RD

LOW GAP RD
588
592
596
600
604
608
612
616
588
592
596
600
604
608
612
616
A19+00 A20+00 A21+00 A22+00 A23+00 A24+00 A25+00 A26+00 A27+00 A28+00 A29+00

EXISTING GRADE

EX W
INV=603.4±

EX W LATERAL
INV=606.2±

EX W LATERAL
INV=606.3±
EX 6" SS
INV=597.6±
EX 15" SS
INV=597.4±
EX 6" SS
INV=598.8±

EX GAS
INV=607.1±

EX GAS
INV=607.1±

EX W
INV=607.2±
INSTALL 1000 LF OF 18" PVC DR 18
TYP
CY111
STA A27+73.29
INV=602.59
18" 22.5° BEND
STA A24+50.14
CARV
18" RW
STA A22+52.00STA A23+24.00

RESTRAINED

JOINTS REQ'D
STA A27+57.00STA A28+05.00

RESTRAINED

JOINTS REQ'D
S=-0.50%
S=-1.19%
S=-2.07%
S=-0.20%
S=-0.05%
STA A21+49.42
INV=599.99
STA A22+84.34
INV=600.06
18" 45° BEND
STA A22+90.95
INV=600.07
18" 45° BEND
STA A24+48.88
INV=601.94
STA A27+88.13
INV=602.90
18" 22.5° BEND
Plot Date: 4/6/2023 9:28:19 AM
SCALE

KEY MAP
PROJECT NO. LAST SAVED BY: FILE NAME:

CDA
BH
BWA
99C02
32 CIVIL

PLAN AND PROFILE ALIGNMENT A
STA A19+00 TO STA A29+00
8660F1099C02.dwg JDiDonato 8660F10

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
Know what's below.

Callbefore you dig.

MATCH LINE STA 19+00 SEE DWG 99C01
MATCH LINE STA 29+00 SEE DWG 99C03
1 1 1 1 1
2 KEY NOTES:

1. VERTICAL BEND ACHIEVED BY PULLING JOINTS IN
PIPE. MAXIMUM ALLOWED DEFLECTION IS HALF

OF THE MANUFACTURER'S SPECIFIED

DEFLECTION CONTRACTOR MAY DEFLECT MORE

THAN ONE JOINT TO ACHIEVE TOTAL
DEFLECTION.

2. LOCATE ARV MINIMUM 15 FEET FROM SANITARY
SEWER.

GENERAL NOTES:

1. THE CONTRACTOR SHALL ASSUME THAT ANY

VERTICAL BENDS SHOWN ARE ROTATED FROM

CORRESPONDING HORIZONTAL BENDS UNLESS
NOTED OTHERWISE.

2. CONTRACTOR TO VERIFY ALL UTILITY CROSSINGS
PRIOR TO CONSTRUCTION.

ORR STREET
#

BRUSH STREET

THIS SHEET
FILE:

PLAN
8660F1001C102

PROFILE
FILE: 8660F1001C102
(HORIZ)
0 2' 4' 8'
SCALE: 1" = 4'
0 20' 40' 80'
SCALE: 1" = 40'
(VERT)

KEY MAP
NORTH
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.10 09:07:39-07'00'

Page 271 of 1800 ends

EX 15" SS
EX 6" SS
EX 15" SS
A29+00 A30+00
A31+00 A32+00 A33+00 A34+00 A35+00 A36+00 A37+00 A38+00 A39+00
EX 12" RW
EX 12" W EX OHW

EX OHW

EX OHW

EX T

EX W

EX T

EX E EX T
EX 15" SS

EX E

EX OHW

EX E

EX T

EX OHW
EX 12" W

EX OHW

EX OHW

EX T

EX T
EX 10"x18" SD
EX 12" SS

EX W
STA A33+84.31
N=2186280.61
E=6219741.18
2-18" 90° VERT BEND
STA A32+26.17
N=2186280.65
E=6219899.32
2-18" 90° VERT BEND
STA A30+36.30
N=2186296.93
E=6220082.45
18" 45° BEND
STA A30+59.21
N=2186280.70
E=6220066.28
18" 45° BEND

LIVE OAK AVE

N BUSH ST

LOW GAP RD

LOW GAP RD
592
596
600
604
608
612
616
620
624
592
596
600
604
608
612
616
620
624
A29+00 A30+00 A31+00 A32+00 A33+00 A34+00 A35+00 A36+00 A37+00 A38+00 A39+00

EXISTING GRADE
144.99 LF OF 30" STEEL CASING
TYP
CY165

NORTH COAST

RAILWAY AUTHORITY
STA A29+28.30
INV=605.79
EX 15" SS
INV=597.7±
EX 6" SS
INV=604.9±
STA A32+26.17
INV=606.80
18" 90° VERT BEND
STA A33+84.31
INV=605.10
18" 90° VERT BEND
EX 18" SD
INV=610.5±

EX W
INV=609.7±

EX T
INV=611.7±

EX GAS
INV=608.6±

EX W LATERAL
INV=608.2±

EX T
INV=608.1±

EX W
INV=609.0±

EX GAS
INV=609.4±

EX GAS
INV=610.5±

EX W
INV=613.2±
EX 12" SS
INV=600.8±
EX 12" SS
INV=601.2±
STA A33+81.77

BLOWOFF
160 LF OF EX 12" DR18
STA A32+24.00
CARV
STA A35+40.02
CARV
STA A37+39.00

BLOW OFF
18'' RW
EX 15 ' SS
INV=601.9±
EX 18" SD
INV=608.5±
S=-0.34%
S=0.91%
STA A30+36.30
INV=606.16
18" 45° BEND
STA A30+59.21
INV=606.23
18" 45° BEND
STA=A31+79.82
18" BFV
STA A32+26.17
INV=598.24
18" 90° VERT BEND
STA A33+84.31
INV=598.24
18" 90° VERT BEND
STA=A34+19.82
18" BFV
STA A35+39.82
INV=605.10
STA A37+40.40
INV=603.67
18" x 12" RED

TIE-IN TO

EXISTING LINE
S=-0.08%
STA A37+00.00
INV=603.65
Plot Date: 4/7/2023 9:51:18 AM
SCALE

KEY MAP
PROJECT NO. LAST SAVED BY: FILE NAME:

CDA
BH
JM
99C03
33 CIVIL

PLAN AND PROFILE ALIGNMENT A
STA A29+00 TO STA A39+00
8660F1099C03.dwg JDiDonato 8660F10

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
Know what's below.

Callbefore you dig.

JACKING PIT

RECEIVING PIT
MATCH LINE STA 29+00 SEE DWG 99C02MATCH LINE STA 39+00 SEE DWG 99C04 2 2
3 TIE-IN TO EXISTING
12" RW PIPELINE
4 4
INSTALL 321 LF OF 18" FPVC DR 18
STA A29+11
STA A37+40
TYP
CY745 CARV
18" BFV
TYP
CY715
BLOW

TYP OFF
CY733
18" BFV
TYP
CY715
CARV
TYP
CY745
BLOW

TYP OFF
CY733
1 KEY NOTES:

1. SEE CITY AS BUILTS FOR EXISTING 12" RW
ALIGNMENT INFORMATION. CONTRACTOR SHALL

CONFIRM EXISTING JOINT RESTRAINT PRIOR TO
OPEN CUT EXCAVATION. IF JOINT RESTRAINT IS

NOT PRESENT, CONTRACTOR SHALL INSTALL
JOINT RESTRAINTS OF SUFFICIENT LENGTH.

2. VERTICAL BEND ACHIEVED BY PULLING JOINT IN
PIPE. MAXIMUM ALLOWED DEFLECTION IS HALF

OF THE MANUFACTURER'S SPECIFIED
DEFLECTION. CONTRACTOR MAY DEFLECT MORE

THAN ONE JOINT TO ACHIEVE TOTAL
DEFLECTION.

3. MAINTAIN MINIMUM 12 FT CLEARANCE BETWEEN
GRADE AND TOP OF CASING.

4. CONTRACTOR TO VERIFY EXACT TIE-IN LOCATION
TO EXISTING 12 INCH RW LINE PRIOR TO
CONSTRUCTION.

5. REMOVE EXISTING CAP.

GENERAL NOTES:

1. CONTRACTOR TO DETERMINE FINAL JACKING
AND RECEIVING PIT SIZE.

2. CONTRACTOR TO VERIFY ALL UTILITY CROSSINGS
PRIOR TO CONSTRUCTION.

3. THE CONTRACTOR SHALL ASSUME THAT ANY

VERTICAL BENDS SHOWN ARE ROTATED FROM

CORRESPONDING HORIZONTAL BENDS UNLESS
NOTED OTHERWISE.

BRUSH STREET
5 INSTALL 11 LF OF 18" PVC DR 18
INSTALL 145 LF OF 18" FPVC DR 18 INSTALL 362 LF OF 18" FPVC DR 18

MAZZONI STREET

THIS SHEET
2 5
TYP
CY165
TYP
CY111
TYP
CY111 TYP
CY111
FILE:

PLAN
8660F1001C102

PROFILE
FILE: 8660F1001C102
(HORIZ)
0 2' 4' 8'
SCALE: 1" = 4'
0 20' 40' 80'
SCALE: 1" = 40'
(VERT)

KEY MAP
NORTH
#
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.10 09:07:53-07'00'

Page 272 of 1800 ends

EX 12" SS
EX 16"X29" SS
EX 10"X18" SD
EX 6" SS
A39+00 A40+00 A41+00
A42+00 A43+00 A44+00
EX 12" RW A45+00 A46+00 A47+00 A48+00 A49+00
EX 12" W
EX 18" SD

EX W EX T EX OHW
EX 10" SS

EX W

EX W
EX 6" SS

EX OHW

EX OHW EX OHW
EX 6" SS

EX OHW
EX 16" W

EX G

EX T EX W EX W

EX OHW

EX E

EX OHW
STA A44+09.91
N=2186293.39
E=6218725.04
18" 45° BEND
STA A44+30.23
N=2186278.96
E=6218710.47
18" 45° BEND
18" RW
STA A43+93.86
N=2186293.20
E=6218741.08
18" x 12" RED

LIVE OAK AVE

N BUSH ST

LOW GAP RD

LOW GAP RD
616
620
624
628
632
636
640
644
648
616
620
624
628
632
636
640
644
648
A39+00 A40+00 A41+00 A42+00 A43+00 A44+00 A45+00 A46+00 A47+00 A48+00 A49+00

EXISTING GRADE
EXISTING 12" CITY LINE EXTENDS
BELOW DRAWING DATUM (NOTE 1)
EX 12" SS
INV=628.0±

EX E
INV=616.4±

EX GAS
INV=624.6±

EX W LATERAL
INV=625.0±

EX W LATERAL
INV=626.6±

EX W LATERAL
INV=627.3±
EX 6" SS
INV=627.7±

EX GAS
INV=628.3±

EX W
INV=628.4±
EX 6" SS
INV=630.1±

EX W LATERAL
INV=630.2±

EX E
INV=631.7±
EX 6" SS
INV=634.5±

EX W LATERAL
INV=634.8±

EX W LATERAL
INV=636.0±

EX E
INV=636.1±

EX W LATERAL
INV=636.6±

EX GAS
INV=636.6±

EX W LATERAL
INV=637.6±

EX W LATERAL
INV=638.4±

EX W LATERAL
INV=639.0±

EX W LATERAL
INV=639.2±

EX GAS
INV=639.2±
INSTALL 506 LF OF 18" PVC DR 18
TYP
CY111

RESTRAINED JOINTS REQUIRED
STA A47+77.30
CARV
S=-2.39%
S=-1.26%
490 LF OF EX 12" PVC
STA A43+96.00
CARV
STA A43+93.86
INV=630.83
18" x 12" RED

TIE-IN TO

EXISTING RW LINE
STA A44+09.91
INV=630.85
18" 45° BEND
STA A44+30.23
INV=630.85
18" 45° BEND
STA=A44+59.82
18" BFV
STA A45+86.92
INV=634.61
STA A47+25.36
INV=636.36
STA A47+77.12
INV=636.36
S=-1.72%
Plot Date: 4/7/2023 9:52:35 AM
SCALE

KEY MAP
PROJECT NO. LAST SAVED BY: FILE NAME:

CDA
BH
JM
99C04
34 CIVIL

PLAN AND PROFILE ALIGNMENT A
STA A39+00 TO STA A49+00
8660F1099C04.dwg JDiDonato 8660F10

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
Know what's below.

Callbefore you dig.

MATCH LINE STA A39+00 SEE DWG 99C03
MATCH LINE STA A49+00 SEE DWG 99C05
2 1 1 1

EXISTING WATER VALVE -

CONTRACTOR TO VERIFY

LOCATION
CARV
TYP
CY745
18" BFV
TYP
CY715
CARV
TYP
CY745
4 5
KEY NOTES:

1. VERTICAL BEND ACHIEVED BY PULLING JOINT IN
PIPE. MAXIMUM ALLOWED DEFLECTION IS HALF

OF THE MANUFACTURER'S SPECIFIED
DEFLECTION. CONTRACTOR MAY DEFLECT MORE

THAN ONE JOINT TO ACHIEVE TOTAL
DEFLECTION.

2. CONTRACTOR TO VERIFY EXACT TIE-IN LOCATION
TO EXISTING 12 INCH RW LINE PRIOR TO
CONSTRUCTION. CONTRACTOR SHALL CONFIRM

EXISTING JOINT RESTRAINT PRIOR TO OPEN CUT
EXCAVATION. IF JOINT RESTRAINT IS NOT

PRESENT, CONTRACTOR SHALL INSTALL JOINT
RESTRAINTS OF SUFFICIENT LENGTH.

3. REMOVE EXISTING CAP.

4. SEE CITY AS BUILTS FOR EXISTING 12" RW
ALIGNMENT AND PIPE INFORMATION.

5. VERTICAL BEND ACHIEVED BY ROLLING
HORIZONTAL BEND.

GENERAL NOTES:

1. SEE CITY AS BUILTS FOR EXISTING 12 INCH RW
ALIGNMENT AND PIPE INFORMATION.

2. CONTRACTOR TO VERIFY ALL UTILITY CROSSINGS
PRIOR TO CONSTRUCTION.

3. THE CONTRACTOR SHALL ASSUME THAT ANY

VERTICAL BENDS SHOWN ARE ROTATED FROM

CORRESPONDING HORIZONTAL BENDS UNLESS
NOTED OTHERWISE.
3 STA A43+95
STA A49+80

LOW GAP RD

N STATE ST

EX E EX G

THIS SHEET
FILE:

PLAN
8660F1001C102

PROFILE
FILE: 8660F1001C102
(HORIZ)
0 2' 4' 8'
SCALE: 1" = 4'
0 20' 40' 80'
SCALE: 1" = 40'
(VERT)

KEY MAP
NORTH
#
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.10 09:08:08-07'00'

Page 273 of 1800 ends

A49+00
A50+00
A51+00
A52+00 A53+00 A54+00 A55+00 A56+00 A57+00 A58+00 A59+00 B10+00
B11+00
C10+00
C11+00
C12+00
EX 8" SS
EX 8" SS EX 6" SS
EX 12" SS
EX 8" SS
EX 12" SD
EX 6" SS EX 18" SD

EX E

EX T

EX OHW
EX 6" SS
EX 16" W

EX W

EX OHW

EX E

EX CATV

EX T
EX 10" W

EX E

EX G
EX 6" SS
EX 12" W

EX OHW

EX W

EX E

EX T

EX E

EX T
EX 16" W
EX 8" W EX E
STA A51+26.74
N=2186297.53
E=6218023.16
18" 11.25° BEND
18" RW
STA A57+58.79
N=2186489.35
E=6217421.45
18"x6" RED WYE
STA A57+75.22
N=2186494.58
E=6217405.87
18"x12" RED TEE
10'' RW
12" RW
6" RW
EX 12" SS
STA A49+97.45
N=2186275.60
E=6218143.26
18" 45° BEND
STA A50+29.13
N=2186297.91
E=6218120.77
18" 45° BEND
STA A51+99.29
N=2186311.12
E=6217951.84
18" 11.25° BEND

LIVE OAK AVE

N BUSH ST

LOW GAP RD

LOW GAP RD
628
632
636
640
644
648
652
656
660
628
632
636
640
644
648
652
656
660
A49+00 A50+00 A51+00 A52+00 A53+00 A54+00 A55+00 A56+00 A57+00 A58+00 A59+00

EXISTING GRADE
STA A51+26.74
INV=638.55
18" 11.25° BEND
STA A57+58.79
INV=643.79
18"x6" RED WYE

EX W
INV=639.7±

EX T
INV=638.3±

EX GAS
INV=640.1±

EX E
INV=640.5±
EX 8" SS
INV=639.2±

EX GAS
INV=640.2±

EX W LATERAL
INV=640.5±
EX 12" SS
INV=635.0±

EX E
INV=640.6±

EX W LATERAL
INV=641.8±

EX W LATERAL
INV=642.8±
EX 2" GAS
INV=643.4±
STA A49+96.00

BLOW OFF
EX 6" W
INV=644.0±

EX GAS
INV=644.6±
EX 6" W
INV=646.2±
EX 6" SS
INV=646.4±
EX 2" GAS
INV=646.8±
EX 2" GAS
INV=647.5±

EX W LATERAL
INV=647.0±

EX GAS
INV=646.8±
STA A57+45.96
CARV

EX COMM
INV=648.5±
EX 18" SD
INV=648.5±

EX E
INV=649.3±
EX 8" W
INV=647.9±
EX 8" SS
INV=648.8±
EX 10" W
INV=646.9±

EX E
INV=646.1±

EX GAS
INV=648.2±
TYP
CY111
STA A51+99.29
INV=639.82
18" 11.25° BEND
S=-6.21%
S=-1.79%
S=-1.04%
S=-1.72%
S=-0.51%
S=-0.31% S=0.06%
STA A49+60STA A50+60STA A51+18STA A51+35STA A51+90STA A52+10

EX G
INV=640.0±

EX G
INV=640.0±
STA A55+20
STA A49+97.45
INV=632.58
18" 45° BEND
STA A50+29.13
INV=632.58
18" 45° BEND
STA A54+59.82
INV=642.51
STA A56+39.82
INV=643.42
STA=A57+39.82
18" BFV
STA A57+75.22
INV=643.84
18"x12" RED TEE
STA A58+13.22
INV=643.82
18" x 10" RED
STA A58+69.82
INV=644.13
S=0.08% S=0.06%

RESTRAINED JOINTS REQ'D
INSTALL 914 LF OF 18" PVC DR18
INSTALL 87 LF OF 10" PVC DR18

RESTRAINED

JOINTS REQ'D

RESTRAINED

RESTRAINED JOINTS REQ'D JOINTS REQ'D
Plot Date: 4/6/2023 9:33:17 AM
SCALE

KEY MAP
PROJECT NO. LAST SAVED BY: FILE NAME:

CDA
BH
BWA
99C05
35 CIVIL

PLAN AND PROFILE ALIGNMENT A
STA A49+00 TO STA A59+00
8660F1099C05.dwg JDiDonato 8660F10

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
MATCH LINE STA A59+00 SEE DWG 99C06
MATCH LINE STA A49+00 SEE DWG 99C04
Know what's below.

Callbefore you dig.

TYP
CY111
CARV
TYP
CY745
18" BFV
TYP
CY715
BLOW

OFF TYP
CY733
2 KEY NOTES:

1. BENDS TO BE ACHIEVED BY PULLING JOINTS IN
PIPE. MAXIMUM ALLOWED DEFLECTION IS HALF

OF THE MANUFACTURER'S SPECIFIED
DEFLECTION. CONTRACTOR MAY DEFLECT MORE

THAN ONE JOINT TO ACHIEVE TOTAL
DEFLECTION.

2. VERTICAL BEND ACHIEVED BY ROLLING
HORIZONTAL BEND.

3. CONTRACTOR SHALL REPLACE ANY CURB AND

GUTTER THAT IS DAMAGED AS A RESULT OF
PIPELINE INSTALLATION. REPLACE PER CITY OF

UKIAH STANDARD SPECIFICATIONS AND SECTION
02772.

4. CONTRACTOR SHALL PROTECT EXISTING SSMH
DURING PIPELINE INSTALLATION. REPLACE IF
DAMAGED. ADJUST PIPELINE ALIGNMENT AS
REQUIRED.

5. CONTRACTOR SHALL PROTECT EXISTING VALVE
DURING PIPELINE INSTALLATION. REPLACE IF
DAMAGED. ADJUST PIPELINE ALIGNMENT AS
REQUIRED.

GENERAL NOTES:

1. CONTRACTOR TO VERIFY ALL UTILITY CROSSINGS
PRIOR TO CONSTRUCTION.

2. CONTRACTOR SHALL ASSUME THAT ANY

VERTICAL BENDS SHOWN ARE ROTATED FROM

CORRESPONDING HORIZONTAL BENDS UNLESS
NOTED OTHERWISE.

3. CONTRACTOR TO REPLACE ALL ROAD STRIPING

DAMAGED BY PIPELINE REPLACEMENT PER
SECTION 02762. CONTRACTOR SHALL REPLACE
ENTIRETY OF DAMAGED STRIPING. N BUSH ST

N PINE ST

N OAK ST
ELM ST

LOW GAP RD
EX 12" SS

EX G

EX OHW

EX W

THIS SHEET
2 2 2 1 1 1
3 3
3 3
3 FILE:

PLAN
8660F1001C102

PROFILE
FILE: 8660F1001C102
(HORIZ)
0 2' 4' 8'
SCALE: 1" = 4'
0 20' 40' 80'
SCALE: 1" = 40'
(VERT)

KEY MAP
NORTH
#
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.10 09:08:22-07'00'

Page 274 of 1800 ends

A59+00 A60+00 A61+00 A62+00 A63+00 A64+00 A65+00 A66+00 A67+00 A68+00 A69+00 EX 18" SD
EX 12" SS
EX 6" W

EX T

EX E EX E

EX T EX 8" W

EX G EX OHW

EX W

EX OHW

EX E EX OHW EX 6" W

EX G

EX E EX T
10" RW EX 8" W

LIVE OAK AVE

N BUSH ST

LOW GAP RD

LOW GAP RD
636
640
644
648
652
656
660
664
668
636
640
644
648
652
656
660
664
668
A59+00 A60+00 A61+00 A62+00 A63+00 A64+00 A65+00 A66+00 A67+00 A68+00 A69+00

EXISTING GRADE

EX W LATERAL
INV=648.8±

EX W LATERAL
INV=648.8±

EX W LATERAL
INV=648.8±

EX W
INV=648.4±

EX W
INV=648.5±

EX W LATERAL
INV=648.5±
EX 6" W
INV=648.0±

EX W LATERAL
INV=648.2±

EX GAS
INV=647.7±

EX GAS
INV=647.5±

EX W LATERAL
INV=647.6±
EX 18" SD
INV=648.1±

EX E
INV=649.5±

EX W LATERAL
INV=648.6±

EX W
INV=650.9±

EX E
INV=653.8±

EX COMM
INV=654.4±
EX 6" SS
INV=642.3±
INSTALL 1000 LF OF 10" PVC DR18
TYP
CY111
S=-0.16%
S=-0.98%
S=-0.77%
S=-2.75%
S=-3.16%
STA A62+36.40
INV=644.71
STA A64+45.81
INV=646.76
STA A66+59.03
INV=648.40
STA A67+79.03
INV=651.71
STA A59+62.00

RESTRAINED

JOINTS REQ'D
Plot Date: 4/7/2023 9:54:00 AM
SCALE

KEY MAP
PROJECT NO. LAST SAVED BY: FILE NAME:

CDA
BH
JM
99C06
36 CIVIL

PLAN AND PROFILE ALIGNMENT A
STA A59+00 TO STA A69+00
8660F1099C06.dwg JDiDonato 8660F10

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
Know what's below.

Callbefore you dig.

MATCH LINE STA A59+00 SEE DWG 99C05
MATCH LINE STA A69+00 SEE DWG 99C07
KEY NOTES:

1. BENDS TO BE ACHIEVED BY PULLING JOINTS IN
PIPE. MAXIMUM ALLOWED DEFLECTION IS HALF

OF THE MANUFACTURER'S SPECIFIED
DEFLECTION. CONTRACTOR MAY DEFLECT MORE

THAN ONE JOINT TO ACHIEVE TOTAL
DEFLECTION.

2. CONTRACTOR SHALL PROTECT EXISTING VALVE
DURING PIPELINE INSTALLATION. REPLACE IF
DAMAGED. ADJUST PIPELINE ALIGNMENT AS
REQUIRED.

3. CONTRACTOR SHALL REPLACE ANY CURB AND

GUTTER THAT IS DAMAGED AS A RESULT OF
PIPELINE INSTALLATION. REPLACE PER CITY OF

UKIAH STANDARD SPECIFICATIONS AND SECTION
02772.

GENERAL NOTES:

1. CONTRACTOR TO VERIFY ALL UTILITY CROSSINGS
PRIOR TO CONSTRUCTION.

2. CONTRACTOR SHALL ASSUME THAT ANY

VERTICAL BENDS SHOWN ARE ROTATED FROM

CORRESPONDING HORIZONTAL BENDS UNLESS
NOTED OTHERWISE.

3. CONTRACTOR TO REPLACE ALL ROAD STRIPING

DAMAGED BY PIPELINE REPLACEMENT PER
SECTION 02762. CONTRACTOR SHALL REPLACE
ENTIRETY OF DAMAGED STRIPING.

LOW GAP RD

N BUSH ST

COTTAGE LN

THIS SHEET
1 1 1 1
2 3
2 FILE:

PLAN
8660F1001C102

PROFILE
FILE: 8660F1001C102
(HORIZ)
0 2' 4' 8'
SCALE: 1" = 4'
0 20' 40' 80'
SCALE: 1" = 40'
(VERT)

KEY MAP
NORTH
#
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.10 09:08:38-07'00'

Page 275 of 1800 ends

LIVE OAK AVE

N BUSH ST

LOW GAP RD

LOW GAP RD
A69+00 A70+00 A71+00 A72+00 A73+00 A74+00 A75+00 A76+00 A77+00 A78+00 A79+00 EX 12" SS
EX 18" SD
EX 8" W EX OHW

EX E
EX 6" SS

EX E

EX T

EX G EX E

EX OHW EX W

EX OHW

EX W

EX W

EX W

EX OHW EX OHW EX OHW EX T

EX T

EX T

EX T
10'' RW
644
648
652
656
660
664
668
672
676
644
648
652
656
660
664
668
672
676
A69+00 A70+00 A71+00 A72+00 A73+00 A74+00 A75+00 A76+00 A77+00 A78+00 A79+00

EXISTING GRADE

EX W LATERAL
INV=661.4±

EX COMM
INV=667.5±

EX COMM
INV=667.8±
EX 18" SD
INV=666.8±
INSTALL 1000 LF OF 10" PVC DR18
TYP
CY111
STA A70+01.12
CARV
M-403
STA A70+68.30

METER TAP
STA A69+73.00
STA A72+27.00

RESTRAINED JOINTS REQ'D
S=-1.23%
S=-3.16%
S=-0.87%
S=-0.61%
S=-0.71%
STA A70+00.15
INV=658.69
STA=A70+99.82
10" GV
STA A71+59.03
INV=660.65
STA A73+29.03
INV=662.12
STA A78+49.42
INV=665.30
Plot Date: 4/7/2023 9:56:16 AM
SCALE

KEY MAP
PROJECT NO. LAST SAVED BY: FILE NAME:

CDA
BH
JM
99C07
37 CIVIL

PLAN AND PROFILE ALIGNMENT A
STA A69+00 TO STA A79+00
8660F1099C07.dwg JDiDonato 8660F10

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
Know what's below.

Callbefore you dig.

MATCH LINE STA A69+00 SEE DWG 99C06
M-403
MATCH LINE STA A79+00 SEE DWG 99C08

WATER METER
CARV
TYP
CY745
TYP
CY901
10" GV
TYP
CY716
KEY NOTES:

1. BENDS TO BE ACHIEVED BY PULLING JOINTS IN
PIPE. MAXIMUM ALLOWED DEFLECTION IS HALF

OF THE MANUFACTURER'S SPECIFIED
DEFLECTION. CONTRACTOR MAY DEFLECT MORE

THAN ONE JOINT TO ACHIEVE TOTAL
DEFLECTION.

2. CONTRACTOR SHALL REPLACE ANY CURB AND

GUTTER THAT IS DAMAGED AS A RESULT OF
PIPELINE INSTALLATION. REPLACE PER CITY OF

UKIAH STANDARD SPECIFICATIONS AND SECTION
02772.

GENERAL NOTES:

1. CONTRACTOR TO VERIFY ALL UTILITY CROSSINGS
PRIOR TO CONSTRUCTION.

2. CONTRACTOR SHALL ASSUME THAT ANY

VERTICAL BENDS SHOWN ARE ROTATED FROM

CORRESPONDING HORIZONTAL BENDS UNLESS
NOTED OTHERWISE.

3. CONTRACTOR TO REPLACE ALL ROAD STRIPING

DAMAGED BY PIPELINE REPLACEMENT PER
SECTION 02762. CONTRACTOR SHALL REPLACE
ENTIRETY OF DAMAGED STRIPING.
#

LOW GAP RD

THIS SHEET
1 1 1 1
2 2
FILE:

PLAN
8660F1001C102

PROFILE
FILE: 8660F1001C102
(HORIZ)
0 2' 4' 8'
SCALE: 1" = 4'
0 20' 40' 80'
SCALE: 1" = 40'
(VERT)

KEY MAP
NORTH
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.10 09:08:52-07'00'

Page 276 of 1800 ends

660
664
668
672
676
680
684
688
692
660
664
668
672
676
680
684
688
692
A79+00 A80+00 A81+00 A82+00 A83+00 A84+00 A85+00 A86+00 A87+00 A88+00 A89+00

EXISTING GRADE
INSTALL 1000 LF OF 10" PVC DR18
TYP
CY111

EX GAS
INV=668.2±

EX COMM
INV=669.5±

EX E
INV=669.6±

EX COMM
INV=669.6±
STA A82+60.00
INV=677.48
STA A83+50.00
INV=679.83
STA A84+70.00
INV=681.12
STA A87+20.00
INV=682.47
STA A87+20.00
CARV
M-404
STA A87+86.48

METER TAP
S=-0.71% S=-6.43%
S=-4.32%
S=-2.61%
S=-1.08%
S=-0.54%
S=-0.18% S=-0.18%

RESTRAINED JOINTS REQ'D
STA=A88+59.82
10" GV
RESTRAINED JOINTS REQ'D STA A80+05.15 INV=666.40 10" 90° BEND STA A80+18.19 INV=667.14 10" 11.25° BEND STA A79+60.00
STA A80+50.00STA A87+30.00
A79+00
A80+00
A81+00 A82+00 A83+00 A84+00 A85+00 A86+00 A87+00 A88+00 A89+00 EX 6" SS
EX 8" W

EX CATV

EX E

EX T

EX G

EX CATV
EX 8" W

EX E

EX T

EX E

EX OHW
10'' RW
STA A80+05.15
N=2187204.12
E=6215291.84
10" 90° BEND
STA A80+18.19
N=2187216.29
E=6215296.52
10" 11.25° BEND

EX G
10+00 9+0 11+00 12+00 13+00 14+00 14+41.55

LIVE OAK AVE

N BUSH ST

LOW GAP RD

LOW GAP RD
Plot Date: 4/7/2023 10:02:34 AM
SCALE

KEY MAP
PROJECT NO. LAST SAVED BY: FILE NAME:

CDA
BH
BWA
99C08
38 CIVIL

PLAN AND PROFILE ALIGNMENT A
STA A79+00 TO STA A89+00
8660F1099C08.dwg JDiDonato 8660F10
M-404
WATER
METER

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
Know what's below.

Callbefore you dig.

MATCH LINE STA A79+00 SEE DWG 99C07
MATCH LINE STA A89+00 SEE DWG 99C09
TYP
CY901
CARV
TYP
CY745 10" GV
TYP
CY716
KEY NOTES:

1. BENDS TO BE ACHIEVED BY PULLING JOINTS IN
PIPE. MAXIMUM ALLOWED DEFLECTION IS HALF

OF THE MANUFACTURER'S SPECIFIED
DEFLECTION. CONTRACTOR MAY DEFLECT MORE

THAN ONE JOINT TO ACHIEVE TOTAL
DEFLECTION.

2. VERTICAL BEND ACHIEVED BY ROLLING
HORIZONTAL BEND.

GENERAL NOTES:

1. CONTRACTOR TO VERIFY ALL UTILITY CROSSINGS
PRIOR TO CONSTRUCTION.

2. CONTRACTOR SHALL ASSUME THAT ANY

VERTICAL BENDS SHOWN ARE ROTATED FROM

CORRESPONDING HORIZONTAL BENDS UNLESS
NOTED OTHERWISE.

3. CONTRACTOR TO REPLACE ALL ROAD STRIPING

DAMAGED BY PIPELINE REPLACEMENT PER
SECTION 02762. CONTRACTOR SHALL REPLACE
ENTIRETY OF DAMAGED STRIPING.
#

DESPINA DR

LOW GAP RD

THIS SHEET
2 2 1 1 1 1
FILE:

PLAN
8660F1001C102

PROFILE
FILE: 8660F1001C102
(HORIZ)
0 2' 4' 8'
SCALE: 1" = 4'
0 20' 40' 80'
SCALE: 1" = 40'
(VERT)

KEY MAP
NORTH
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.10 09:09:07-07'00'

Page 277 of 1800 ends

A89+00 A89+55.99
10+00 9+0 11+00 12+00 13+00 14+00 14+41.55

LIVE OAK AVE

N BUSH ST

LOW GAP RD

LOW GAP RD
668
672
676
680
684
688
692
696
700
668
672
676
680
684
688
692
696
700
A89+00 A90+00 A90+40

EXISTING GRADE
10 INCH

RESTRAINED
CAP
M-405
STA A89+54.00

METER TAP
STA A89+56.01
INV 682.89
STA A89+50.00
CARV
Plot Date: 4/7/2023 8:45:47 AM
SCALE

KEY MAP
PROJECT NO. LAST SAVED BY: FILE NAME:

CDA
BH
BWA
99C09
39 CIVIL

PLAN AND PROFILE ALIGNMENT A
STA A89+00 TO STA A89+55.99
8660F1099C09.dwg JDiDonato 8660F10

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON
ORIGINAL DRAWING 0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
123456789 10 11 12 13
ABCDEF
123456789 10 11 12 13

ABCDEFG
G
®
No. 76832
Know what's below.

Callbefore you dig.

MATCH LINE STA A89+00 SEE DWG 99C08
M-405

WATER METER TYP
CY901
INSTALL 58 LF OF
10" PVC DR18

RESTRAINED

JOINTS REQUIRED
CARV
TYP
CY745
GENERAL NOTES:

1. CONTRACTOR TO VERIFY ALL UTILITY CROSSINGS
PRIOR TO CONSTRUCTION.

STA A89+58

DESPINA DR
TYP
CPY111

THIS SHEET
FILE:

PLAN
8660F1001C102

PROFILE
FILE: 8660F1001C102
(HORIZ)
0 2' 4' 8'
SCALE: 1" = 4'
0 20' 40' 80'
SCALE: 1" = 40'
(VERT)

KEY MAP
NORTH
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.10 09:09:22-07'00'

Page 278 of 1800 ends

A57+00
A58+00
A59+00
C10+00
EX 8" SS EX 12" SD
EX 12" SD EX 12" SD
EX 12" SS
EX 6" SS
EX 12" SS
EX 8" SS
EX 18" SD
EX 8" W

EX CATV

EX T

EX E

EX E

EX E

EX CATV

EX T EX G EX E

EX G

EX E
STA B10+18.72
N=2186506.10
E=6217413.11
6" 11.25° BEND
STA B10+00
N=2186489.35
E=6217421.45
18"x6" RED WYE
B10+00 B11+00 B12+00 B13+00 B14+00 B15+00 B16+00 B17+00 B18+00 B19+00

LIVE OAK AVE

N BUSH ST

LOW GAP RD

LOW GAP RD
636
640
644
648
652
656
660
664
668
636
640
644
648
652
656
660
664
668
B9+00 B10+00 B11+00 B12+00 B13+00 B14+00 B15+00 B16+00 B17+00 B18+00 B19+00 STA B10+00 INV=643.79 18"x6" RED WYE

EXISTING GRADE

EX E
INV=648.6±
EX 12" SD
INV=648.6±
EX 6" W
INV=647.8±

EX CATV
INV=649.4±

EX COMM
INV=649.6±

EX E
INV=650.0±

EX E
INV=651.4±

EX GAS
INV=654.0±

EX E
INV=655.2±
STA A14+84.40
INV=649.47
STA A18+25.90
INV=651.50
INSTALL 1000 LF OF 6" PVC DR18
TYP
CY111
STA B18+25.90
CARV
S=-1.18%
S=-0.59%
S=0.97%
STA B10+09.94

BLOW OFF

RESTRAINED JOINTS REQ'D

RESTRAINED

JOINTS REQ'D
STA B10+00.00STA B10+60.00
STA B10+18.72
INV=644.290
6" 11.25° BEND
STA=B10+606" GV
STA B18+90.00
Plot Date: 4/7/2023 10:04:51 AM
SCALE

KEY MAP
PROJECT NO. LAST SAVED BY: FILE NAME:

CDA
BH
BWA
99C10
40 CIVIL

PLAN AND PROFILE ALIGNMENT B
STA B9+00 TO STA B19+00
8660F1099C10.dwg JDiDonato 8660F10

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
Know what's below.

Callbefore you dig.

MATCH LINE STA B19+00 SEE DWG 99C11
1 1
BLOW

OFF TYP
CY733
6" GV
TYP
CY716

BIKE LANE STRIPING
CARV
TYP
CY745
2 N BUSH ST

LOW GAP RD

THIS SHEET
KEY NOTES:

1. BENDS TO BE ACHIEVED BY PULLING JOINTS IN
PIPE. MAXIMUM ALLOWED DEFLECTION IS HALF

OF THE MANUFACTURER'S SPECIFIED
DEFLECTION. CONTRACTOR MAY DEFLECT MORE

THAN ONE JOINT TO ACHIEVE TOTAL
DEFLECTION.

2. VERTICAL BEND ACHIEVED BY ROLLING
HORIZONTAL BEND.

GENERAL NOTES:

1. CONTRACTOR TO VERIFY ALL UTILITY CROSSINGS
PRIOR TO CONSTRUCTION.

2. CONTRACTOR SHALL ASSUME THAT ANY

VERTICAL BENDS SHOWN ARE ROTATED FROM

CORRESPONDING HORIZONTAL BENDS UNLESS
NOTED OTHERWISE.

3. CONTRACTOR TO REPLACE ALL ROAD STRIPING

DAMAGED BY PIPELINE REPLACEMENT PER
SECTION 02762. CONTRACTOR SHALL REPLACE
ENTIRETY OF DAMAGED STRIPING.
#
FILE:

PLAN
8660F1001C102

PROFILE
FILE: 8660F1001C102
(HORIZ)
0 2' 4' 8'
SCALE: 1" = 4'
0 20' 40' 80'
SCALE: 1" = 40'
(VERT)

KEY MAP
NORTH
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.10 09:09:37-07'00'

Page 279 of 1800 ends

640
644
648
652
656
660
664
668
672
640
644
648
652
656
660
664
668
672
B19+00 B20+00 B21+00 B22+00 B23+00 B24+00 B25+00 EX COMM INV=654.6± EX W LATERAL INV=651.2± EX W LATERAL INV=650.6± EX W LATERAL INV=650.2± EX W LATERAL INV=649.6± EX W LATERAL INV=649.2± STA B22+69.11 INV=647.182 6" 90° BEND STA B23+88.90 INV=647.710 6" 11.25° BEND STA B22+69.00 BLOW OFF INSTALL 516 LF OF 6" PVC DR18
TYP
CY111

EXISTING GRADE
M-402
STA B19+70.00

METER TAP
STA B19+94.81
INV=650.090
6" 45° BENDSTA B24+16.24
INV=648.310
6" RESTRAINED CAP
6" RW

EX GAS
INV=652.2±
S=1.06%
S=0.44%
S=2.20%

RESTRAINED JOINTS REQUIRED

RESTRAINED

JOINTS REQUIRED

RESTRAINED

JOINTS REQUIRED
S=0.96%
STA B19+71.65
INV=650.090
6" 45° WYE
STA=B20+406" GV
M-401
STA B24+13.00

METER TAP
STA B24+16.00CARV
STA B21+20.00STA B22+40.00STA B23+00.00STA B23+35.00STA B24+16.00

EX G

EX T

EX G
EX 8" W EX G

EX G
EX 6" SS
EX 6" W
EX 8" W

EX G EX 6" SS

EX G EX 6" W

EX G
STA B19+71.65
N=2187447.98
E=6217274.06
6" 45° WYE
STA B19+94.81
N=2187465.23
E=6217289.50
6" 45° BEND
STA B22+69.11
N=2187485.50
E=6217563.05
6" 90° BEND
STA B23+88.90
N=2187366.08
E=6217572.50
6" 11.25° BEND
6" RW
6" RWB24+16.34
B18+00 B19+00
B20+00 B21+00 B22+00
B23+00
B24+00

LIVE OAK AVE

N BUSH ST

LOW GAP RD

LOW GAP RD
Plot Date: 4/7/2023 8:47:31 AM
SCALE

KEY MAP
PROJECT NO. LAST SAVED BY: FILE NAME:

CDA
BH
BWA
99C11
41 CIVIL

PLAN AND PROFILE ALIGNMENT B
STA B19+00 TO STA B24+16.34
8660F1099C11.dwg JDiDonato 8660F10

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON
ORIGINAL DRAWING 0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
123456789 10 11 12 13
ABCDEF
123456789 10 11 12 13

ABCDEFG
G
®
No. 76832
Know what's below.

Callbefore you dig.

MATCH LINE STA B19+00 SEE DWG 99C10
PROJECT NO. LAST SAVED BY: FILE NAME:

CDA
BH
BWA
99C11
41 CIVIL

PLAN AND PROFILE ALIGNMENT B
STA B19+00 TO STA B24+16.34
8660F1099C11.dwg JDiDonato 8660F10
M-401
WATER
METER
TYP
CY901
M-402
WATER

METER TYP
CY901
6" RESTRAINED CAP
6" GV
TYP
CY716
BLOW

TYP OFF
CY733
CARV
TYP
CY745
6" RESTRAINED CAP
2222
KEY NOTES:

1. VERTICAL BEND TO BE ACHIEVED BY PULLED
PIPE. MAXIMUM ALLOWED DEFLECTION IS HALF

OF THE MANUFACTURER'S SPECIFIED
DEFLECTION. CONTRACTOR MAY DEFLECT MORE

THAN ONE JOINT TO ACHIEVE TOTAL
DEFLECTION.

2. VERTICAL BEND ACHIEVED BY ROLLING
HORIZONTAL BEND.

3. CONTRACTOR SHALL REPLACE ANY CURB AND

GUTTER THAT IS DAMAGED AS A RESULT OF
PIPELINE INSTALLATION. REPLACE PER CITY OF

UKIAH STANDARD SPECIFICATIONS AND SECTION
02772.

GENERAL NOTES:

1. CONTRACTOR TO VERIFY ALL UTILITY CROSSINGS
PRIOR TO CONSTRUCTION.

2. CONTRACTOR SHALL ASSUME THAT ANY

VERTICAL BENDS SHOWN ARE ROTATED FROM

CORRESPONDING HORIZONTAL BENDS UNLESS
NOTED OTHERWISE.

3. CONTRACTOR TO REPLACE ALL ROAD STRIPING

DAMAGED BY PIPELINE REPLACEMENT PER
SECTION 02762. CONTRACTOR SHALL REPLACE
ENTIRETY OF DAMAGED STRIPING.
#

ARLINGTON DR LOCKWOOD DR

N BUSH ST

N PINE ST

THIS SHEET
3 3
3 3
FILE:

PLAN
8660F1001C102

PROFILE
FILE: 8660F1001C102
(HORIZ)
0 2' 4' 8'
SCALE: 1" = 4'
0 20' 40' 80'
SCALE: 1" = 40'
(VERT)

KEY MAP
NORTH
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.10 09:09:53-07'00'

Page 280 of 1800 ends

19+00 0+0 11+0 12+00 13+00 14+00 14+41.55

LIVE OAK AVE

N BUSH ST

LOW GAP RD

LOW GAP RD
624
628
632
636
640
644
648
652
656
624
628
632
636
640
644
648
652
656
C9+00 C10+00 C11+00 C12+00 C13+00 C14+00 C15+00 C16+00 C17+00 C18+00 C19+00 TYP
CY111

EXISTING GRADE
INSTALL 1000 LF OF 12" PVC DR18

RESTRAINED JOINTS REQ'D RESTRAINED JOINTS REQUIRED
S=0.37% S=0.41% S=0.39%
S=1.18%
S=2.83%
S=2.96%
S=10.69%
S=0.12% S=0.03% S=0.91%
S=0.56%
EX 6" SS
INV=633.7±
EX 8" SS
INV=647.7±
EX 12" W
INV=647.4±

EX E
INV=649.1±

EX GAS
INV=647.8±

EX COMM
INV=648.2±

EX W (HYD)
INV=646.3±

EX COMM
INV=646.3±

EX GAS
INV=646.0±

EX W (HYD)
INV=644.2±

EX W (HYD)
INV=638.9±

EX W
INV=638.2±

EX GAS
INV=638.1±
EX 18" SD
INV=635.5±
EX 12" SD
INV=635.5±
EX 6" SS
INV=639.6±
STA C11+40.61
INV=643.56
STA C11+20.00
CARV
STA C16+12.37
CARV
M-406
STA C16+50.00

METER TAP
STA C10+62.34
INV=643.70
12" 45° BEND
STA C14+60.64
INV=638.79
STA C16+45.06
INV=630.89
12" 11.25° BEND
STA C16+56.80
INV=630.89
12" 45° BEND
STA C16+79
12" GV
STA C17+00.15
INV=630.90
12" 45° BEND
STA C17+38.60
INV=631.06
STA C18+00.15
INV=630.33
12" 90° BEND
STA C12+55.00STA C15+29.00STA C18+55.40
STA C11+01.05
12" GV
STA C16+15.05
INV=634.04
12" 90° BEND
STA C10+00.00 STA C10+00.00
INV=643.92
18"x12" RED TEE
STA C14+00.60
INV=640.49
STA A57+75.22
N=2186494.58
E=6217405.87
18"x12" RED TEE
STA C10+62.34
N=2186435.49
E=6217386.03
12" 45° BEND
STA C16+15.05
N=2185892.41
E=6217488.66
12" 90° BEND
STA C16+56.80
N=2185885.48
E=6217447.51
12" 45° BEND
STA C17+00.15
N=2185850.03
E=6217422.56
12" 45° BEND
STA C18+00.15
N=2185832.92
E=6217324.03
12" 90° BEND
C10+00
C11+00
C12+00
C13+00
C14+00
C15+00
C16+00
C17+00
C18+00
C19+00
B10+00
A55+00 A56+00 A57+00 A58+00
EX 12" SS
EX 6" SS
EX 6" SS
EX 12" SD
EX 18" SD
EX 18" SD

EX T

EX G

EX OHW
EX 16" W

EX W

EX W

EX W

EX W

EX W

EX OHW

EX OHW

EX OHW

EX W

EX W

EX G

EX OHW
EX 6" SS

EX W

EX OHW
EX 18" SD
EX 6" SS
12" RW
12" GV
Plot Date: 4/7/2023 5:15:17 AM
SCALE

KEY MAP
PROJECT NO. LAST SAVED BY: FILE NAME:

CDA
BH
BWA
99C12
42 CIVIL

PLAN AND PROFILE ALIGNMENT C
STA C10+00 TO STA C19+00
8660F1099C12.dwg JDiDonato 8660F10

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
Know what's below.

Callbefore you dig.

M-406
WATER
METER
2 TYP
CY901
CARV
TYP
CY745
CARV
TYP
CY745
12" GV
TYP
CY716
1 KEY NOTES:

1. VERTICAL BEND TO BE ACHIEVED BY ROTATING
HORIZONTAL BEND.

2. VERTICAL BEND TO BE ACHIEVED BY PULLED
PIPE. MAXIMUM ALLOWED DEFLECTION IS HALF

OF THE MANUFACTURER'S SPECIFIED
DEFLECTION. CONTRACTOR MAY DEFLECT MORE

THAN ONE JOINT TO ACHIEVE TOTAL
DEFLECTION.

3. CONTRACTOR SHALL REPLACE ANY CURB AND

GUTTER THAT IS DAMAGED AS A RESULT OF
PIPELINE INSTALLATION. REPLACE PER CITY OF

UKIAH STANDARD SPECIFICATIONS AND SECTION
02772.

4. CONTRACTOR SHALL PROTECT EXISTING SSMH
DURING PIPELINE INSTALLATION. REPLACE IF
DAMAGED. ADJUST PIPELINE ALIGNMENT AS
REQUIRED.

5. CONTRACTOR SHALL PROTECT EXISTING VALVE
DURING PIPELINE INSTALLATION. REPLACE IF
DAMAGED. ADJUST PIPELINE ALIGNMENT AS
REQUIRED.

GENERAL NOTES:

1. CONTRACTOR TO VERIFY ALL UTILITY CROSSINGS
PRIOR TO CONSTRUCTION.

2. CONTRACTOR SHALL ASSUME THAT ANY

VERTICAL BENDS SHOWN ARE ROTATED FROM

CORRESPONDING HORIZONTAL BENDS UNLESS
NOTED OTHERWISE.

3. CONTRACTOR TO REPLACE ALL ROAD STRIPING

DAMAGED BY PIPELINE REPLACEMENT PER
SECTION 02762. CONTRACTOR SHALL REPLACE
ENTIRETY OF DAMAGED STRIPING.
#
MATCH LINE STA C19+00 SEE DWG 99C13

LOW GAP RD

N BUSH ST

THIS SHEET
FILE:

PLAN
8660F1001C102

PROFILE
FILE: 8660F1001C102
(HORIZ)
0 2' 4' 8'
SCALE: 1" = 4'
0 20' 40' 80'
SCALE: 1" = 40'
(VERT)

KEY MAP
NORTH
TYP
CY716
4 3
5 2 2 1 1
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.10 09:10:13-07'00'

Page 281 of 1800 ends

620
624
628
632
636
640
644
648
652
620
624
628
632
636
640
644
648
652
C19+00 C20+00 C21+00 C22+00 C23+00 C24+00 C25+00 C26+00 C27+00 C28+00 C29+00 S=0.56% S=-0.58%
S=-0.82%
S=-0.01% S=0.01% S=0.01%
S=1.36%
STA C21+26.74
INV=628.65
12" 90° BEND
STA C21+36.62
INV=628.70
12" 11.25° BEND
STA C25+25.51
INV=631.90
12" 11.25° BEND
STA C25+98.71
12" GV
STA C27+44.72
INV=631.90
12" 11.25° BEND
STA C27+65.60
INV=631.90
EX 18" SD
INV=633.0±
STA C21+24.73

BLOW OFF

EXISTING GRADE
INSTALL 1000 LF OF 12" PVC DR18

RESTRAINED JOINTS REQ'D
STA C20+74.00STA C21+82.00

RESTRAINED JOINTS REQ'D
STA C24+49.00STA C27+70.00
STA C27+40.00
CARV
M-407
STA C24+80.00

METER TAP
TYP
CY111
STA C25+25.51
N=2185532.67
E=6216981.94
12" 11.25° BEND
STA C27+44.72
N=2185588.20
E=6216769.88
12" 11.25° BEND
C24+00
C25+00
C26+00 C27+00
C28+00
C29+00
STA C21+26.74
N=2185511.15
E=6217379.91
12" 90° BEND
STA C21+36.62
N=2185509.63
E=6217370.14
12" 11.25° BEND
12" RW 12" RW
C18+00
C19+00
C20+00
C21+00
C22+00
C23+00
C24+00
9+00

LIVE OAK AVE

N BUSH ST

LOW GAP RD

LOW GAP RD
Plot Date: 4/7/2023 5:29:43 AM
SCALE

KEY MAP
PROJECT NO. LAST SAVED BY: FILE NAME:

CDA
BH
BWA
99C13
43 CIVIL

PLAN AND PROFILE ALIGNMENT C
STA C19+00 TO STA C29+00
8660F1099C13.dwg JDiDonato 8660F10

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832

THIS SHEET
MATCH LINE STA C23+40 SEE LEFT
MATCH LINE STA C19+00 SEE DWG 99C12
Know what's below.

Callbefore you dig.

MATCH LINE STA C23+40 SEE RIGHT
MATCH LINE STA C29+00 SEE DWG 99C14
KEY NOTES:

1. APPROXIMATE SD LOCATION AND ELEVATION
BASED ON CITY GIS MAP. OUTFALL TO CREEK
WAS NOT FOUND IN THE FIELD. CONTRACTOR TO
FIELD VERIFY PRIOR TO CONSTRUCTION.

2. VERTICAL BEND TO BE ACHIEVED BY PULLED
PIPE. MAXIMUM ALLOWED DEFLECTION IS HALF

OF THE MANUFACTURER'S SPECIFIED
DEFLECTION. CONTRACTOR MAY DEFLECT MORE

THAN ONE JOINT TO ACHIEVE TOTAL
DEFLECTION.

GENERAL NOTES:

1. CONTRACTOR TO VERIFY ALL UTILITY CROSSINGS
PRIOR TO CONSTRUCTION.
#
BLOW

OFF TYP
CY733
M-407
WATER
METER
TYP
CY901
1 EX-18" SD
TYP
CY715
CARV
TYP
CY745
FILE:

PLAN
8660F1001C102

PROFILE
FILE: 8660F1001C102
(HORIZ)
0 2' 4' 8'
SCALE: 1" = 4'
0 20' 40' 80'
SCALE: 1" = 40'
(VERT)

KEY MAP
NORTH
2 Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.10 09:10:30-07'00'

Page 282 of 1800 ends

624
628
632
636
640
644
648
652
656
660
624
628
632
636
640
644
648
652
656
660
C29+00 C30+00 C31+00 C32+00 C33+00 C34+00 C35+00 C36+00 C37+00 C38+00 C39+00 STA C29+96.23 INV=629.60 12" 22.5° BEND STA C30+10.59 INV=635.19 12" 22.5° BEND STA C32+16.94 INV=635.19 12" 22.5° BEND STA C33+25 INV=635.19 12" 90° BEND STA C33+25 INV=643.40 12" 90° BEND STA C34+30 INV=643.40 12" 90° BEND STA C34+30 INV=637.17 12" 90° BEND STA C35+34.79 INV=639.32 12" 11.25° BEND STA C38+50.21 INV=646.50 12" 11.25° BEND STA C29+35.18 INV=629.60 STA C34+71.65 INV=637.18 STA C35+74.21 INV=640.68 STA C36+62.55 INV=645.67 STA C37+14.75 INV=646.50 STA C29+75.00 BLOW OFF TYP
INSTALL 405 LF OF 12" PVC DR18 CY111

RESTRAINED JOINTS REQ'D
STA C31+75.00STA C35+80.00

RESTRAINED JOINTS REQ'D
STA C38+09.00
S=1.36% S=0.00% S=0.00%
S=-41.14%
S=0.00% S=0.00%
S=0.00%
S=-0.03%
S=-3.41%
S=-3.49%
S=-5.65%
S=-1.59%
S=0.00%
S=-19.86%
INSTALL 147 LF OF 12" DIP PC350 INSTALL 448 LF OF 12" PVC DR18 TYP
CY111

EXISTING GRADE
STA C33+05.00

PVC TO DI TRANSITION
STA C34+52.00
PVC TO DI TRANSITION STA C34+60.00

BLOW OFF
STA C29+55.64
INV=629.60
12" 22.5° BEND

RESTRAINED JOINTS REQ'D
STA C29+44.00STA C30+55.00
11+00
LIVE
OAK
AVE

N BUSH ST

LOW GAP RD

LOW GAP RD
C29+00
C30+00
C31+00
C32+00
C33+00
C34+00
C35+00
C36+00 C37+00 C38+00 C39+00
STA C32+16.94
N=2185714.69
E=6216324.27
12" 22.5° BEND
STA C35+34.79
N=2185714.69
E=6216006.42
12" 11.25° BEND 12" RW
STA C29+55.64
N=2185600.56
E=6216559.32
12" 22.5° BEND
Plot Date: 4/7/2023 6:13:17 AM
SCALE

KEY MAP
PROJECT NO. LAST SAVED BY: FILE NAME:

CDA
BH
BWA
99C14
44 CIVIL

PLAN AND PROFILE ALIGNMENT C
STA C29+00 TO STA C39+00
8660F1099C14.dwg JDiDonato 8660F10

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832

THIS SHEET
Know what's below.

Callbefore you dig.

MATCH LINE STA C29+00 SEE DWG 99C13
KEY NOTES:

1. HORIZONTAL BEND ACHIEVED BY ROTATING DUAL
90 DEGREE VERTICAL BENDS.

2. REFER TO SHEET 99S12 FOR BRIDGE, ABUTMENT,
AND PIPE CONNECTION DETAILS.

3. VERTICAL BEND TO BE ACHIEVED BY PULLED
PIPE. MAXIMUM ALLOWED DEFLECTION IS HALF

OF THE MANUFACTURER'S SPECIFIED
DEFLECTION. CONTRACTOR MAY DEFLECT MORE

THAN ONE JOINT TO ACHIEVE TOTAL
DEFLECTION.
#
GENERAL NOTES:

1. NOT USED.

BLOW

OFF TYP
CY733
BLOW

OFF TYP
CY733
FILE:

PLAN
8660F1001C102

PROFILE
FILE: 8660F1001C102
(HORIZ)
0 2' 4' 8'
SCALE: 1" = 4'
0 20' 40' 80'
SCALE: 1" = 40'
(VERT)

KEY MAP
NORTH
MATCH LINE STA C39+00 SEE DWG 99C15
2 3
3 3 3 3
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.10 09:10:45-07'00'

Page 283 of 1800 ends

648
652
656
660
664
668
672
676
680
684
648
652
656
660
664
668
672
676
680
684
C39+00 C40+00 C41+00 C42+00 C43+00 C44+00 C45+00 C46+00 C47+00 C48+00 C49+00 STA C39+63.47 INV=669.00 12" 11.25° BEND STA C39+77.40 INV=669.00 12" 45° BEND STA C40+14.21 INV=669.00 12" 45° BEND STA C40+56.63 INV=669.00 12" 11.25° BEND STA C40+86.72 INV=663.74 12" 22.5° BEND STA C41+52.61 INV=650.66 12" 11.25° BEND STA C41+58.52 INV=650.64 12" 11.25° BEND STA C43+18.76 INV=653.64 12" 11.25° BEND STA C40+00.00 CARV STA C45+23.97 INV=660.13 12" 11.25° BEND STA C45+33.66 INV=660.42 12" 11.25° BEND STA C45+75.21 INV=670.02 12" 11.25° BEND STA C45+84.50 INV=670.02 12" 11.25° BEND STA C46+68.39 INV=670.02 12" 90° BEND STA C48+81.67 INV=676.50 12" 90° BEND EX 6" SS INV=674.4± EX GAS INV=679.0± EX 8" SS INV=673.0± EX 6" UTIL INV=653.7± STA C39+90 12" GV STA C42+60.00 BLOW OFF STA C48+89.90 CARV TYP
INSTALL 1000 LF OF 12" PVC DR18 CY111

RESTRAINED JOINTS REQ'D
STA C41+65.00
STA C42+24.39
INV=650.67

EXISTING GRADE
S=-19.86%
S=0.00%
S=18.22%
S=19.98%
S=0.40%
S=-0.00%
S=-3.16%
S=-3.18%
S=-3.29%
S=-23.15%
S=0.16% S=0.00%
S=-3.50%
S=-2.76%
STA C47+55.92
INV=673.06
S=0.02%

RESTRAINED JOINTS REQ'D
STA C43+10.00STA C43+25.00

RESTRAINED JOINTS REQ'D
STA C45+15.00STA C47+25.00
RESTRAINED JOINTS REQ'D STA C48+25.00
M-408
STA C39+30.00
METER TAPM-409
STA C46+35.00

METER TAP
STA C39+77.40
N=2185817.96
E=6215576.02
12" 45° BEND
STA C40+14.21
N=2185798.71
E=6215544.63
12" 45° BEND
STA C40+86.72
N=2185728.21
E=6215527.72
12" 22.5° BEND
STA C41+58.52
N=2185657.29
E=6215538.96
12" 11.25° BEND
STA C43+18.76
N=2185497.17
E=6215532.69
12" 11.25° BEND
STA C45+23.97
N=2185297.62
E=6215484.84
12" 11.25° BEND
STA C45+84.50
N=2185237.14
E=6215482.48
12" 11.25° BEND
STA C46+68.39
N=2185156.13
E=6215460.98
12" 90° BEND
STA C48+81.67
N=2185086.95
E=6215662.74
12" 90° BEND
12" RW
C38+00
C39+00
C40+00
C41+00
C42+00
C43+00 C44+00
C45+00
C46+00
C47+00
C48+00
C49+00
11+00
LIVE
OAK
AVE

N BUSH ST

LOW GAP RD

LOW GAP RD
Plot Date: 4/7/2023 11:32:02 AM
SCALE

KEY MAP
PROJECT NO. LAST SAVED BY: FILE NAME:

CDA
BH
BWA
99C15
45 CIVIL

PLAN AND PROFILE ALIGNMENT C
STA C39+00 TO STA C49+00
8660F1099C15.dwg JDiDonato 8660F10

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
Know what's below.

Callbefore you dig.

KEY NOTES:

1. VERTICAL BEND TO BE ACHIEVED BY PULLED
PIPE. MAXIMUM ALLOWED DEFLECTION IS HALF

OF THE MANUFACTURER'S SPECIFIED
DEFLECTION. CONTRACTOR MAY DEFLECT MORE

THAN ONE JOINT TO ACHIEVE TOTAL
DEFLECTION.

GENERAL NOTES:

1. CONTRACTOR TO VERIFY ALL UTILITY CROSSINGS
PRIOR TO CONSTRUCTION.

2. CONTRACTOR TO REPLACE ALL ROAD STRIPING

DAMAGED BY PIPELINE REPLACEMENT PER
SECTION 02762. CONTRACTOR SHALL REPLACE
ENTIRETY OF DAMAGED STRIPING.
#

THIS SHEET
M-408
METER
TAP
12" BFV
CARV
M-409
METER
TAP
CARV
MATCH LINE STA C39+00 SEE DWG 99C14 MATCH LINE STA C49+00 SEE DWG 99C16 FILE:

PLAN
8660F1001C102

PROFILE
FILE: 8660F1001C102
(HORIZ)
0 2' 4' 8'
SCALE: 1" = 4'
0 20' 40' 80'
SCALE: 1" = 40'
(VERT)

KEY MAP
NORTH

BLOW OFF
EX 6" UTILITY
1 1
TYP
CY901
TYP
CY715
TYP
CY745
TYP
CY901
TYP
CY745
TYP
CY733
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.10 09:11:01-07'00'

Page 284 of 1800 ends

NO PARKING

NO PARKING
NO

PARKING

NO PARKING

NO PARKING

NO PARKING

NO PARKING

NO PARKING

NO PARKING
EX 6" SS

EX G
EX 4" W

EX W
EX 6" SS

EX OHW
EX 8" W
EX 8" W

EX OHW

EX OHW
STA C49+07.21
N=2185062.99
E=6215653.93
12" x 8" RED
C49+00 C50+00 C51+00 C52+00 C53+00 C54+00 C55+00
C56+00
C57+00
C58+00
C59+00
8" RW
STA C56+15.54
N=2184414.14
E=6215379.19
8" 11.25° BEND
STA C56+31.12
N=2184399.91
E=6215372.84
8" 22.5° BEND
STA C57+34.49
N=2184296.57
E=6215370.04
8" x 6" RED
STA. 54+84.74
N=2184520.88
E=6215454.77
Δ=15°07'40"

LIVE OAK AVE

N BUSH ST

LOW GAP RD

LOW GAP RD
672
676
680
684
688
692
696
700
704
672
676
680
684
688
692
696
700
704
C49+00 C50+00 C51+00 C52+00 C53+00 C54+00 C55+00 C56+00 C57+00 C58+00 C59+00 EX GAS INV=679.0± EX W INV=686.3± EX 8" W INV=691.0± EX W LATERAL INV=693.4± STA C49+07.21 INV=676.67 12" x 8" RED STA C55+76.78 INV=688.35 8" 11.25° BEND STA C55+87.79 INV=690.36 8" 11.25° BEND STA C56+15.54 INV=690.82 8" 11.25° BEND STA C56+31.12 INV=690.98 8" 22.5° BEND STA C57+34.49 INV=692.42 8" x 6" RED STA C49+18.17 INV=676.67 STA C49+87.21 8" BFVSTA C53+33.90 INV=683.62 STA C54+84.74 INV=688.20 STA C57+14.50 8" GV

EXISTING GRADE
S=0.04% S=-1.67%
S=-1.67%
S=-3.04%
S=-0.16%
S=-19.92%
S=-1.09% S=-1.12% S=-0.99% S=-3.08%
S=-2.49%
TYP
CY111
INSTALL 7 LF OF 12" PVC DR18
INSTALL 827 LF OF 8" PVC DR18 TYP
CY111
INSTALL 162 LF OF 6" PVC DR18
TYP
CY111
RESTRAINED JOINTS REQ'D RESTRAINED JOINTS REQ'D STA C50+92.00 STA C55+93.00 STA C58+20.00
M-410
STA A57+00.00
METER TAPM-411
STA A57+30.00

METER TAP
Plot Date: 4/7/2023 11:32:39 AM
SCALE

KEY MAP
PROJECT NO. LAST SAVED BY: FILE NAME:

CDA
BH
BWA
99C16
46 CIVIL

PLAN AND PROFILE ALIGNMENT C
STA C49+00 TO STA C59+00
8660F1099C16.dwg JDiDonato 8660F10

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
Know what's below.

Callbefore you dig.
8" BFV
TYP
CY715
KEY NOTES:

1. VERTICAL BEND TO BE ACHIEVED BY PULLED
PIPE. MAXIMUM ALLOWED DEFLECTION IS HALF

OF THE MANUFACTURER'S SPECIFIED
DEFLECTION. CONTRACTOR MAY DEFLECT MORE

THAN ONE JOINT TO ACHIEVE TOTAL
DEFLECTION.

2. VERTICAL BEND TO BE ACHIEVED BY ROTATING
HORIZONTAL BEND.

3. CONTRACTOR SHALL PROTECT EXISTING SSMH
DURING PIPELINE INSTALLATION. REPLACE IF
DAMAGED. ADJUST PIPELINE ALIGNMENT AS
REQUIRED.

4. CONTRACTOR SHALL REPLACE ANY CURB AND

GUTTER THAT IS DAMAGED AS A RESULT OF
PIPELINE INSTALLATION. REPLACE PER CITY OF

UKIAH STANDARD SPECIFICATIONS AND SECTION
02772.

GENERAL NOTES:

1. CONTRACTOR TO VERIFY ALL UTILITY CROSSING
PRIOR TO CONSTRUCTION.

2. THE CONTRACTOR SHALL ASSUME THAT ANY

VERTICAL BENDS SHOWN ARE ROTATED FROM

CORRESPONDING HORIZONTAL BENDS UNLESS
NOTED OTHERWISE.

3. CONTRACTOR TO REPLACE ALL ROAD STRIPING

DAMAGED BY PIPELINE REPLACEMENT PER
SECTION 02762. CONTRACTOR SHALL REPLACE
ENTIRETY OF DAMAGED STRIPING.
#
M-411
TYP
CY901
8" GV
TYP
CY716
M-410
TYP
CY901

LIVE OAK AVE

LIVE OAK AVE

CYPRESS AVE

CLUBHOUSE DR

THIS SHEET
4 1
FILE:

PLAN
8660F1001C102

PROFILE
FILE: 8660F1001C102
(HORIZ)
0 2' 4' 8'
SCALE: 1" = 4'
0 20' 40' 80'
SCALE: 1" = 40'
(VERT)

KEY MAP
NORTH
MATCH LINE STA C59+00 SEE DWG 99C17
MATCH LINE STA C49+00 SEE DWG 99C15
1 1
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.10 09:11:15-07'00'

Page 285 of 1800 ends

688
692
696
700
704
708
712
716
720
688
692
696
700
704
708
712
716
720
C59+00 C60+00 C61+00 C62+00 C63+00 C64+00 C65+00 C66+00 C67+00 C68+00 EX W (HYD) INV=700.4± EX E INV=701.8± EX W (HYD) INV=702.0± EX 6" SS INV=698.5± EX 6" W INV=700.9± EX 8" SS INV=703.0± S=-1.11%
S=-1.35%
S=-1.90% S=-1.43%
S=-1.94%
S=3.58%
S=0.00%
S=-2.57%
STA C60+22.31
INV=699.667
6" 45° BEND
STA C60+73.52
INV=700.230
6" 45° BEND
STA C61+07.35
INV=700.680
6" 11.25° BEND
STA C61+27.21
INV=701.050
6" 11.25° BEND
STA C61+76.36
INV=701.750
6" 11.25° BEND
STA C62+25.44
INV=702.690
6" 22.5° BEND
STA C63+81.67
INV=697.120
6" 90° BEND
STA C64+12.00
INV=697.12
INSTALL 1000 LF OF 6" PVC DR18
TYP
CY111
STA C62+20.00
CARV
STA C64+10.00

BLOW OFF
STA C60+10.00STA C60+34.00STA C60+61.00
STA C60+86.00
STA C61+01.00STA C61+14.00
STA C61+20.00STA C61+32.00
STA C61+70.00STA C61+82.00STA C62+18.00STA C62+30.00STA C63+50.00STA C64+11.00STA C67+34.00

NO PARKING

NO PARKING
NO

PARKING

NO PARKING

NO PARKING

NO PARKING

NO PARKING

NO PARKING

NO PARKING

NO PARKING

NO PARKING

NO PARKING

NO PARKING

NO PARKING

NO PARKING

NO PARKING
EX 6" SS
EX 8" W

EX OHW
EX 8" W
EX 6" SS

EX OHW
EX 6" SS
STA C60+22.31
N=2184008.86
E=6215362.25
6" 45° BEND
STA C60+73.52
N=2183971.68
E=6215397.47
6" 45° BEND
STA C61+07.35
N=2183937.90
E=6215395.64
6" 11.25° BEND
STA C61+27.21
N=2183918.24
E=6215398.46
6" 11.25° BEND
STA C61+76.36
N=2183871.88
E=6215414.78
6" 11.25° BEND
STA C62+25.44
N=2183829.66
E=6215439.80
6" 22.5° BEND
STA C63+81.67
N=2183744.05
E=6215570.49
6" 90° BEND
6" RWC59+00
6" RW
C60+00
C61+00
C62+00
C63+00
C64+00
C65+00
C66+00

EX OHW
EX 8" SS
EX 4" W
EX 6" SS
6" RW
C65+00 C66+00 C67+00 C68+00

LIVE OAK AVE

N BUSH ST

LOW GAP RD

LOW GAP RD
Plot Date: 4/7/2023 11:33:12 AM
SCALE

KEY MAP
PROJECT NO. LAST SAVED BY: FILE NAME:

CDA
BH
BWA
99C17
47 CIVIL

PLAN AND PROFILE ALIGNMENT C
STA C59+00 TO C68+00
8660F1099C17.dwg JDiDonato 8660F10

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
Know what's below.

Callbefore you dig.

MATCH LINE STA C65+00 SEE LEFT
MATCH LINE STA C65+00 SEE RIGHT
MATCH LINE STA C59+00 SEE DWG 99C16
MATCH LINE STA C68+00 SEE DWG 99C18

BLOW OFF
TYP
CY733
CARV
TYP
CY745

THIS SHEET
FILE:

PLAN
8660F1001C102

PROFILE
FILE: 8660F1001C102
(HORIZ)
0 2' 4' 8'
SCALE: 1" = 4'
0 20' 40' 80'
SCALE: 1" = 40'
(VERT)

KEY MAP
NORTH
KEY NOTES:

1. VERTICAL BEND TO BE ACHIEVED BY PULLED
PIPE. MAXIMUM ALLOWED DEFLECTION IS HALF

OF THE MANUFACTURER'S SPECIFIED
DEFLECTION. CONTRACTOR MAY DEFLECT MORE

THAN ONE JOINT TO ACHIEVE TOTAL
DEFLECTION.

2. VERTICAL BEND TO BE ACHIEVED BY ROTATING
HORIZONTAL BEND.

3. CONTRACTOR TO SUPPORT UTILITY POLE AS
REQUIRED BY UTILITY POLE OWNER.

4. RESTRAINED JOINTS REQUIRED.

GENERAL NOTES:

1. CONTRACTOR TO VERIFY ALL UTILITY CROSSING
PRIOR TO CONSTRUCTION.

2. THE CONTRACTOR SHALL ASSUME THAT ANY

VERTICAL BENDS SHOWN ARE ROTATED FROM

CORRESPONDING HORIZONTAL BENDS UNLESS
NOTED OTHERWISE.

3. CONTRACTOR TO REPLACE ALL ROAD STRIPING

DAMAGED BY PIPELINE REPLACEMENT PER
SECTION 02762. CONTRACTOR SHALL REPLACE
ENTIRETY OF DAMAGED STRIPING.
3 1 1 1 1 1 1
#
4 4 4 4 4 4
1 4
4 Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.10 09:04:13-07'00'

Page 286 of 1800 ends

696
700
704
708
712
716
720
724
728
696
700
704
708
712
716
720
724
728
C68+00 C69+00 C70+00 C71+00 C72+00 S=-2.56% S=-0.65%
S=-0.85%
STA C68+14.64
6" GV
STA C68+38.73
INV=707.98
6" 45° BEND
STA C68+40.15
INV=707.98
6" x 4" RED
STA C68+69.90
INV=708.17
4" 22.5° BEND
M-412
STA C68+68.00
METER TAPM-413
STA C70+40.00

METER TAP
STA C70+45.00
CARV
INSTALL 206 LF OF 4" PVC DR18

RESTRAINED JOINTS REQ'D

GRADE ASSUMED
STA C70+45.45
TYP
CY111
INSTALL 40 LF OF 6" PVC DR18
TYP
CY111

NO PARKING

NO PARKING
C68+00
C69+00
C70+00
C70+45.56
STA C68+69.90
N=2183351.19
E=6215295.37
4" 22.5° BEND
STA C68+38.73
N=2183358.01
E=6215325.78
6" 45° BEND
STA C68+40.15
N=2183357.70
E=6215324.40
6" x 4" RED
4" RW
6" RW
11+00 LIVE OAK AVE N BUSH ST

LOW GAP RD

LOW GAP RD
Plot Date: 4/7/2023 11:33:43 AM
SCALE

KEY MAP
PROJECT NO. LAST SAVED BY: FILE NAME:

CDA
BH
BWA
99C18
48 CIVIL

PLAN AND PROFILE ALIGNMENT C
STA C68+00 TO STA C70+45.56
8660F1099C18.dwg JDiDonato 8660F10

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON
ORIGINAL DRAWING 0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
123456789 10 11 12 13
ABCDEF
123456789 10 11 12 13

ABCDEFG
G
®
No. 76832
Know what's below.

Callbefore you dig.

MATCH LINE STA C68+00 SEE DWG 99C17
M-413
METER
TAP
CARV
M-412
METER
TAP

THIS SHEET
FILE:

PLAN
8660F1001C102

PROFILE
FILE: 8660F1001C102
(HORIZ)
0 2' 4' 8'
SCALE: 1" = 4'
0 20' 40' 80'
SCALE: 1" = 40'
(VERT)

KEY MAP
NORTH
4" RESTRAINED CAP
6" GV
TYP
CY716
KEY NOTES:

1. VERTICAL BEND TO BE ACHIEVED BY PULLED
PIPE. MAXIMUM ALLOWED DEFLECTION IS HALF

OF THE MANUFACTURER'S SPECIFIED
DEFLECTION. CONTRACTOR MAY DEFLECT MORE

THAN ONE JOINT TO ACHIEVE TOTAL
DEFLECTION.

2. VERTICAL BEND TO BE ACHIEVED BY ROTATING
HORIZONTAL BEND.

GENERAL NOTES:

1. CONTRACTOR TO VERIFY ALL UTILITY CROSSING
PRIOR TO CONSTRUCTION.

2. THE CONTRACTOR SHALL ASSUME THAT ANY

VERTICAL BENDS SHOWN ARE ROTATED FROM

CORRESPONDING HORIZONTAL BENDS UNLESS
NOTED OTHERWISE.

3. CONTRACTOR TO REPLACE ALL ROAD STRIPING

DAMAGED BY PIPELINE REPLACEMENT PER
SECTION 02762. CONTRACTOR SHALL REPLACE
ENTIRETY OF DAMAGED STRIPING.
#
TYP
CY901
TYP
CY901
TYP
CY745
111
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.10 09:03:46-07'00'

Page 287 of 1800 ends

602
601
600
601
600
600
602
600
599
601
602
598
599
600
EX-21" SS
21" SS
21" SS
21" SS
16" RW
4" RW
16" OVERFLOW
EX-16" RW
600 599 598 597 596
601
602
595
602
602
Plot Date: 4/7/2023 11:51:50 AM

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
PROJECT NO. LAST SAVED BY: FILE NAME:

CDA
BH
BWA
99C19
49 CIVIL

PUMP STATION AND

STORAGE SITE PLAN
8660F1099C19.dwg JDiDonato 8660F10
FILE:

PLAN
8660F1001C102
0 15' 30' 60'
SCALE: 1" = 30'
Know what's below.

Callbefore you dig.

RECYCLED WATER

STORAGE TANK

ACCESS ROAD

NEW BLADDER TYPE

SURGE VESSEL

EXISTING PIPE TO BE

DECOMMISSIONED
(ABANDONED/REMOVED)

MAINTAIN EXISTING

SLUDGE POND
NEW

RECONSTRUCTED
POND

TOE OF SLOPE

TOP OF SLOPE
EX 24" DIP TRANSFER PIPE

FROM BOOSTER PS
C
99S02

ELECTRICAL

BUILDING
A
99M01

RECYCLED WATER

PUMP STATION
TYP
CY131
3 5
4 D
99M03
TYP
CY131
3 2
EX 24" SDR 35

PVC OVERFLOW
EX 18" CLCS PW

DISTRIBUTION PIPE
EX 1 1/2"

PVC NPW
EX 6"
PVC SS

EX TREATMENT BLDG
EX 16" RW

FROM WWTP

EX TRANSFORMER
EX 6"
PVC SS

TANK FILL VALVE
F
99S06

ELECTRICAL DUCT BANK

ELECTRICAL DUCT BANK
6 C
99C21

OLD CASTLE PRECAST HEADWALL (TYP),

OR EQUAL, OR CAST IN PLACE WITH

ACCORDANCE WITH CALTRANS
STANDARD PLAN D86B
INV: 595.00
KEY NOTES:

1. MAINTAIN USE OF EXISTING POND. DAMAGE TO

EXISTING BANK MUST BE PROTECTED OR
REPAIRED.

2. CONSTRUCT NEW ACCESS ROAD. TIE INTO
EXISTING PAVING.

3. NEW CONNECTION TO PHASES 1-3 PIPELINE. 16"
PVC 90-DEGREE BEND. PROVIDE THRUST BLOCK
PER CY131/TYP.

4. EXISTING PIPE TO BE DEWATERED, CAPPED, AND
ABANDONED IN PLACE.

5. REROUTE 360 LF OF 21" SANITARY SEWER. SEE
DWG 99C22.

6. PROTECT 24" DIP IN PLACE DURING POND
RECONSTRUCTION. REPLACE IN PLACE SEGMENT

OF PIPE DAYLIGHTED DUE TO POND EXCAVATION
AND CONSTRUCTION.

GENERAL NOTES:

1. SEE ELECTRICAL DRAWINGS FOR ELECTRICAL
ROUTING AND DETAILS.
#
5 Digitally signed by Reace P. Fisher
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 15:05:05-07'00'

Page 288 of 1800 ends

600
599
598 597
596
601
602
595
602
602
3:1
3:1
3:1
3:1
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
C1
C2
C3
C4
C5
C6
C7
5' MIN TANK FLOWLINE
100'

COORDINATE CONTROL POINTS
POINT 123456789
10 11
12 13
14 15
16 17
18 19
20 21
22 23
24 NORTHING
2186432.31
2186412.37
2186404.57
2186398.81
2186375.82
2186338.26
2186377.89
2186376.76
2186427.13
2186439.15
2186462.03
2186466.02
2186470.77
2186447.73
2186443.74
2186420.69
2186425.31
2186461.67
2186470.13
2186492.11
2186558.26
2186587.34
2186596.62
2186569.87

EASTING
6223035.61
6223037.12
6222933.98
6222919.81
6222892.36
6222847.51
6222804.48
6222789.53
6222768.18
6222781.31
6222765.54
6222765.23
6222828.07
6222854.89
6222855.19
6222882.00
6222929.76
6222962.09
6222806.37
6222781.66
6222778.90
6222804.76
6222927.48
6222957.57

ELEVATION
598.40
597.60
601.20
601.30
601.70

0.00 602.00
602.00
601.95
601.75
601.65
601.60
601.20
601.20
601.20
601.20
601.00
601.00
601.00
601.00
601.00
601.00
601.00
601.00

DESCRIPTION

PI ROAD

PI ROAD
PC C1
PT C1

PI ASPHALT

CENTER OF TANK

PI ASPHALT

PUMP STA SE CORNER

PUMP STA NW CORNER

ELEC BLDG SE CORNER

ELEC BLDG NW CORNER

PI ASPHALT
PC C2
PT C2
PC C3
PT C3
PC C4
PT C4
PC C5
PT C5
PC C6
PT C6
PC C7
PT C7

CURVE TABLE
NO. XX
C1
C2
C3
C4
C5
C6
C7
LENGTH

15.54'

39.27'

39.27'

53.80'

36.91'

43.04'

44.93'
RADIUS

25.00'

25.00'

25.00'

35.00'

23.00'

28.00'

28.00'
DELTA
35°37'06"
90°00'00"
90°00'00"
88°03'54"
91°56'06"
88°03'54"
91°56'06"

TANGENT

8.03'

25.00'

25.00'

33.84'

23.79'

27.07'

28.96'
Plot Date: 4/7/2023 11:52:20 AM

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON
ORIGINAL DRAWING 0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
123456789 10 11 12 13
ABCDEF
123456789 10 11 12 13

ABCDEFG
G
®
PROJECT NO. LAST SAVED BY: FILE NAME:

CDA
BH
BWA
99C20
50 CIVIL

GRADING AND DRAINAGE
PLAN
8660F1099C20.dwg JDiDonato 8660F10
FILE:

PLAN
8660F1001C102
0 15' 30' 60'
SCALE: 1" = 30'
Know what's below.

Callbefore you dig.

RECYCLED WATER

STORAGE TANK

NEW BLADDER TYPE

SURGE VESSEL
NEW

RECONSTRUCTED

POND TOE OF SLOPE

TOP OF SLOPE
C
99S02

ELECTRICAL

BUILDING
A
99M01

RECYCLED WATER
PUMP STATION 5
D
99M03
2 KEY NOTES:

1. MATCH EXISTING GRADE WHERE INDICATED.

2. GRADE MIN 4% AWAY FROM TANK IN ALL
DIRECTIONS.

3. REMOVABLE GUARD POST PER CF161/TYP.

4. ALL UNPAVED AREAS WITHIN THE PROJECT SITE

SHALL BE COMPACTED AND RESEEDED PER
SPECIFICATIONS UNLESS NOTED OTHERWISE.

5. GRAVEL ACCESS ROAD SHALL BE 0'=6" AB OVER
GEOTEXTILE FABRIC WITH 1'=0" SUBGRADE AT
95% RC UNLESS OTHERWISE NOTED.

6. CONDUIT TRENCH PATCH TO MATCH EXISTING
GRADE.

7. REFER TO DWG 99C22 FOR SSMH LOCATIONS.

GENERAL NOTES:

1. SEE ELECTRICAL DRAWINGS FOR ELECTRICAL
ROUTING AND DETAILS.
#

EX TREATMENT BLDG

EX TRANSFORMER

TANK FILL VALVE
F
99S06
SSMH
SSMH

ELEC HH

ELEC HH

ELEC HH

EX FENCE TO
REMAIN
1 B
99C21
FG 601.25
FL 601.49
FG 601.25
A
99C21
FL 602.90
FG 603.39
FG 602.40
FL 602.20
S=1.00%
S=1.00%
S=0.95% S=1.00%
S=1.00%
FL 602.20
FG 602.40 S=1.00%
S=1.00%
FL 601.60
FG 601.22
FL 601.84
±
±±
-
4 1
4 4
5 5
5 3 TYP OF 4
3 TYP OF 7
TYP OF 4
3 1
1 6
6 6
6 FL 603.19
7 7 SSMH
7 Digitally signed by Reace P. Fisher
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 15:06:37-07'00'

Page 289 of 1800 ends

1 10'-0" 10'-0"
1" LIP

2.5 % SLOPE
3 2
CL

FL SWALE
5'-0"
4 % MIN

FF TANK
Plot Date: 4/7/2023 11:53:01 AM
GENERAL NOTES:

1. REFER TO SPECIFICATIONS AND GEOTEXTILE

REPORT FOR SUBGRADE PREPARATION
REQUIREMENTS.

SCALE

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
PROJECT NO. LAST SAVED BY: FILE NAME:

CDA
JRD
BWA
99C21
51 CIVIL

SECTIONS
8660F1099C21.dwg JDiDonato 8660F10
SCALE:

FILE:

A
99C20

SECTION
1/2" = 1'-0"
8660F1001C107
SCALE:

FILE:

B
99C20

SECTION
1/2" = 1'-0"
8660F1001C107
0 1' 2' 4'
SCALE:
1 2" = 1'-0"
SCALE:

FILE:

C
99C19

SECTION - TYPICAL POND BERM

NO SCALE
8660F1001C107

SCARIFY AND RECOMPACT
TO 90%

BASIN LINING RIVER ROCK
(6" MIN) OVER GEOTEXTILE
FABRIC PER SECTION 02620

EXCAVATION NEAT LINE

BASIN SIDE SLOPE
3H:1V (TYP)
FG: 595.00
3 TOP OF BERM
(MATCH EXISTING GRADE)
3 KEY NOTES:

1. GRAVEL ACCESS ROAD SHALL BE 0'-6" AB OVER
GEOTEXTILE FABRIC WITH 1'-0" SUBGRADE AT
95% RC UNLESS OTHERWISE NOTED.

2. ALL UNPAVED AREAS WITHIN THE PROJECT SITE

SHALL BE COMPACTED AND RESEEDED PER
SPECIFICATIONS UNLESS OTHERWISE NOTED.

3. REFER TO DWG 99C20 FOR FINAL GRADING
ELEVATIONS.

X
Digitally signed by Reace P. Fisher
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 15:08:37-07'00'

Page 290 of 1800 ends

9+00 10+00
11+00
12+00
13+00
14+00 EX 21" SS
EX 21" SS
21" SS 21" SS
STA. 10+00.00
60" MH01
N=2186294.83
E=6222714.84
STA. 10+59.59
60" MH02
N=2186246.87
E=6222750.22
STA. 13+68.52
60" MH03
N=2186295.44
E=6223055.30
16" RW
576
580
584
588
592
596
600
604
576
580
584
588
592
596
600
604
9+00 10+00 11+00 12+00 13+00 14+00 60" MH01 STA. 10+00 RIM=599.18 INV IN=588.84 (21" SE) INV IN=588.94 (21" W) 60" MH02 STA. 10+59.59 RIM=599.16 INV IN=588.68 (21" NW) INV OUT=588.54 (21" E) 60" MH03 STA. 13+68.52 RIM=597.92 INV IN=587.30 (21" W) INV OUT=587.30 (21" E) EX 21" SS
EX 21" SS
21" SS
21" SS
S=0.27%
S=0.40%
Plot Date: 4/7/2023 10:13:35 AM
SCALE

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
Know what's below.

Callbefore you dig.

PROJECT NO. LAST SAVED BY: FILE NAME:

CDA
JDM
BWA
99C22
52 CIVIL

SEWER REALIGNMENT
8660F1099C22.dwg atucker 8660F10
FILE:

PLAN
8660F1001C102

PROFILE
FILE: 8660F1001C102
(HORIZ)
0 2' 4' 8'
SCALE: 1" = 4'
0 10' 20' 40'
SCALE: 1" = 20'
(VERT)
TYP
CS110

EXISTING GRADE
TYP
CS110
TYP
CS110
3 FUTURE

RECYCLED WATER

STORAGE TANK
2 1
1 1
KEY NOTES:

1. CONTRACTOR TO VERIFY THE INVERTS OF ALL

REPLACEMENT MANHOLES PRIOR TO

REPLACEMENT

2. STORAGE TANK, YARD PIPING, AND ELECTRICAL
DUCT BANK SHOWN FOR REFERENCE ONLY.

REFER TO SPECIFIC DRAWINGS FOR
CONSTRUCTION DETAILS. INSTALLATION OF THE

STORAGE TANK, YARD PIPING, AND ELECTRICAL

DUCT BANKS SHALL OCCUR AFTER THE

REPLACEMENT SEWER HAS BEEN CONSTRUCTED

3. SEGMENT OF EXISTING 21-INCH SEWER TO BE
REMOVED.

4. SEGMENT OF EXISTING 16-INCH RECYCLED

WATER PIPELINE TO BE DECOMMISSIONED
GENERAL NOTES:

1. CONTRACTOR TO VERIFY THE HORIZONTAL AND

VERTICAL LOCATIONS OF ALL EXISTING UTILITIES

PRIOR TO THE START OF CONSTRUCTION AND

NOTIFY THE ENGINEER OF ANY DISCREPANCIES
OR CONFLICTS.

2. EXISTING SEWER SEGMENT TO BE REMOVED AND

REPLACED AS SHOWN IN THE NEW SEWER

ALIGNMENT PRIOR TO THE CONSTRUCTION OF
STORAGE TANK.

3. CONTRACTOR TO BYPASS SEWER FLOWS DURING
REPLACEMENT OF SEWER.

X
367 LF 21-INCH SDR 21 PVC SS
TYP
CY111
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.10 09:02:27-07'00'

Page 291 of 1800 ends

Plot Date: 4/6/2023 8:53:07 AM PROJECT NO. LAST SAVED BY: FILE NAME:

MH
RGU
MCK
ARCHITECTURAL 99A01

ELECTRICAL BUILDING

CODE ANALYSIS, SCHEDULES, AND EGRESS PLAN
8660F1099A01.dwg vpetersvargas 8660F10

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 199

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 84405
ROOM
NO. ROOM NAME OCCUPANCY ACCESSIBILITY BASIC

ALLOWABLE
AREA

ALLOWABLE

FLOOR AREA

PER OCCUP
ACTUAL
SQ FT

SPRINKLERED
EXITS

REQUIRED/

PROVIDED

OCCUPANCY

SEPARATION

BASIC ALLOW

STORIES/HEIGHT

OCCUPANCY
LOAD

CONSTRUCTION
TYPE
2022 CALIFORNIA BUILDING CODE
101 F-1 II-B 2 STORIES/55 FT 15,500 300 1 2/2 NR NR NR* - BUILDING ACTUAL F-1 II-B 2 STORIES/55 FT 15,500
ELECTRICAL ROOM 264
264

ELECTRICAL BUILDING

COMMENTS
NO.

DOOR

WIDTH THICK HEIGHT
DOOR

MAT'L FINISH WIDTH HEIGHT DEPTH TYPE
FRAME

MAT'L FINISH HEAD JAMB

DETAILS

SILL READER
CARD
LABEL
UL
TYPE

DOOR AND HARDWARE SCHEDULE

REMARKS
HW
GROUP

MAT'L MATERIAL
HW HARDWARE GROUP, REFERENCE SPECIFICATION SECTION 08710

NR NOT REQUIRED

R REQUIRED

UL UNDERWRITERS LABORATORIES FIRE RATING

ELECTRICAL BUILDING
101-1 7'-2" 1 3/4" V HM COATING

COATING
6'-8"
3'-4"
7'-4"
7'-4"
8"
8"
R
R
HM
HM

COATING

COATING
C
C
C
C
E
E
NR
NR
NR
NR
HW-1
HW-2
-
-
PR (3'-0'')
101-2 3'-0" 7'-2" 1 3/4" V HM
ROOM
NO. ROOM NAME
MAT'L
FLOOR

FINISH MAT'L
BASE

MAT'L FINISH

NORTH WALL

MAT'L HEIGHT

CEILING

MAT'L FINISH FINISH

SOUTH WALL

MAT'L FINISH MAT'L FINISH

EAST WALL WEST WALL

ROOM FINISH SCHEDULE

ELECTRICAL BUILDING
101 ELECTRICAL ROOM CONC SEALER CMU CMU PAINTING CMU PAINTING CMU PAINTING CMU PAINTING MTLDK ±18'-0" EXPO

EGRESS ABBREVIATION AND SYMBOL LIST
# #
##
SF: SQUARE FEET
OL: OCCUPANT LOAD
OLF: OCCUPANT LOAD FACTOR
SPR: AUTOMATIC SPRINKLER
NA: NOT APPLICABLE

DIRECTION OF EGRESS PATH

LENGTH OF EGRESS IN FEET

EXIT SIGN

FIRE EXTINGUISHER
FILE:

SCALE:

ELECTRICAL BUILDING - EGRESS PLAN A 1/4" = 1'-0"
8660F10S100
101

ELECTRICAL
ROOM
SF - 264
OL - 1
OLF - 300

SPR - NR

ENVELOPE COMPONENT U-VALUE REQUIRED U-VALUE PROVIDED
2022 CALIFORNIA ENERGY CODE
BUILDING ENVELOPE REQUIREMENTS - MENDOCINO COUNTY, CLIMATE ZONE 2

DOORS - SWINGING

DOORS - NONSWINGING

WALLS ABOVE GRADE, MASS

FLOORS, MASS

ROOFS - ABOVE ROOF DECK
U - 1.45
U - 0.70
CODE ANALYSIS ABBREVIATION LIST:

F-1 FACTORY INDUSTRIAL GROUP, MODERATE HAZARD OCCUPANCY (2022, CBC)

NR NOT REQUIRED

R REQUIRED

R-VALUE THERMAL RESISTANCE, IS THE INVERSE OF THE

TIME RATE OF HEAT FLOW THROUGH A BODY FROM ONE OF

ITS BOUNDING SURFACES TO THE OTHER SURFACE FOR A UNIT

TEMPERATURE DIFFERENCE BETWEEN THE TWO SURFACES,

UNDER STEADY STATE CONDITIONS, PER UNIT AREA
(2022, CBC)

SQ FT SQUARE FEET

U-FACTOR THERMAL TRANSMITTANCE, IS THE

COEFFICIENT OF HEAT TRANSMISSION (AIR TO AIR)

THROUGH A BUILDING COMPONENT OR ASSEMBLY, EQUAL

TO THE TIME RATE OF HEAT FLOW PER UNIT AREA AND UNIT

TEMPERATURE DIFFERENCE BETWEEN THE WARM SIDE AND

COLD SIDE AIR FILMS
(2022, CBC)
11' -2'' 13' -0''
FXE
U - 0.034 R-25
U - 0.039
U - 0.170 *
*
*
*
*
FXE
IN ACCORDANCE WITH SECTION 100.0(e)2.C OF THE 2022 CALIFORNIA ENERGY CODE, PROCESS SPACES. REFERENCE TITLE 24 DOCUMENTS FOR COMPLIANCE. *
IN ACCORDANCE WITH SECTION 11B-203.5 OF THE 2022 CALIFORNIA BUILDING

CODE, ELECTRICAL ROOMS ARE EXEMPT FROM ACCESSIBILITY REQUIREMENTS TYP
AJ103
TYP
AJ100
TYP
AJ105
TYP
AJ107
TYP
AJ109
Digitally signed by Matthew C. Kallevant
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 16:56:39-04'00'
5263 OF 200

Page 292 of 1800 ends

Plot Date: 4/7/2023 9:59:06 AM PROJECT NO. LAST SAVED BY: FILE NAME:

MH
RGU
JKN
99A02
54 ARCHITECTURAL

ELECTRICAL BUILDING

ELEVATIONS
8660F1099A02.dwg vpetersvargas 8660F10

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON
ORIGINAL DRAWING 0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
123456789 10 11 12 13
ABCDEF
123456789 10 11 12 13

ABCDEFG
G
®
No. 84405
1 18'-0"

TOP OF MASONRY

EL REFERENCE

STRUCTURAL
TOP OF

FINISH FLOOR

EL REFERENCE

STRUCTURAL
18'-0"

TOP OF MASONRY

EL REFERENCE

STRUCTURAL
TOP OF

FINISH FLOOR

EL REFERENCE

STRUCTURAL
18'-0"

TOP OF MASONRY

EL REFERENCE

STRUCTURAL
TOP OF

FINISH FLOOR

EL REFERENCE

STRUCTURAL
18'-0"

TOP OF MASONRY

EL REFERENCE

STRUCTURAL
TOP OF

FINISH FLOOR

EL REFERENCE

STRUCTURAL
7'-4"
24 SCALE:

FILE:

ELEVATION
E 1/4" = 1'-0"
8660F1001A201
NORTH
SCALE:

FILE:

ELEVATION
F 1/4" = 1'-0"
8660F1001A201
SOUTH
SCALE:

FILE:

ELEVATION
G 1/4" = 1'-0"
8660F1001A201
EAST
SCALE:

FILE:

ELEVATION
H 1/4" = 1'-0"
8660F1001A201
WEST
GENERAL NOTES:

1. FOR GENERAL STRUCTURAL NOTES, REFER TO
DRAWING 00S01.

2. FOR DOOR SCHEDULES, REFER TO DRAWING
98A01.

3. EXTERIOR CONCRETE MASONRY UNITS TO BE
FINISHED WITH WATER REPELLANT.

TYP
AC310 W/ CAGE
TYP
AG225
TYP
AG222
TYP
AG220
TYP
AG225
TYP
AG227
3 TYP
AG220
3 TYP
AC310 W/ CAGE
TYP
AC310 W/ CAGE
TYP
AG220
3 TYP
AG220
3 1
1 1
7'-4"
24 1. 12''x8"x16'' STANDARD CONCRETE MASONRY
UNIT. REFER TO SPECIFICATION SECTION
04220.

2. HOLLOW METAL DOOR AND FRAME. SPEC
SECTION 08110.

3. ALUMINUM COPING OVER PARAPET IN

ACCORDANCE WITH SPECIFICATION SECTION
07700.

4. EXTERNAL LIGHT FIXTURE REFERENCE
ELECTRICAL DRAWINGS.
# KEY NOTES:

Digitally signed by Matthew C. Kallevant
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 16:56:45-04'00'

Page 293 of 1800 ends

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 86094
JKN
AL
KP
00S01
55 STRUCTURAL

GENERAL STRUCTURAL NOTES
8660F100S01.dw
g
kjackson 8660F10
P
lotD
ate:12/14/2022
8:36:08
AM
UnitsDiscipline
P
lotD
ate: 07-APR
-2023 11:42:01
AM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
GENERAL NOTES: GEOTECHNICAL REPORT / FOUNDATION DESIGN CRITERIA:

TYPICAL STRUCTURAL MATERIALS:

CONSTRUCTION: STRUCTURAL SYMBOLS:

CURED TO THEIR MINIMUM SPECIFIED 28-DAY COMPRESSIVE STRENGTH.

OF THE WALL ARE IN PLACE, ARE COMPLETE, AND (IN THE CASE OF CONCRETE) HAVE

2.DO NOT PLACE BACKFILL AGAINST WALLS UNTIL STRUCTURES SUPPORTING THE TOP PREPARED, BEFORE PROCEEDING WITH FOUNDATION CONSTRUCTION.

OBTAIN ENGINEER’S OBSERVATION OF SUBGRADE SURFACES, AS EXPOSED AND AS

1. EXPOSE AND PREPARE SUBGRADE AS SHOWN ON THE DRAWINGS AND SPECIFIED.

EXCAVATION AND BACKFILLING:

REINFORCING STEEL (FOR CONCRETE AND MASONRY):

CONCRETE:

STRUCTURAL STEEL:

STAINLESS STEEL:

B. TYPE 304L: E304L-15 ELECTRODES.

A. TYPE 316L: E316L-15 ELECTRODES.

4. WELDED CONNECTIONS:

C. TYPE 304/304L: ASTM F 593, GRADE B8, CLASS 1, HEAVY HEX.

B. TYPE 316/316L: ASTM F 593, GRADE B8M, CLASS 1, HEAVY HEX.

A. MATCH ALLOY OF THE STRUCTURAL MEMBERS CONNECTED.

3. BOLTED CONNECTIONS - BOLTS AND ANCHOR BOLTS:

2. SECTIONS: SHAPES AND BARS: ASTM A 276.

1. ANSI TYPE 316/316L EXCEPT WHERE TYPE 304/304L IS INDICATED ON THE DRAWINGS.

STRUCTURAL ALUMINUM:

ALLOY 4043 ELECTRODES.

A. GAS METAL ARC (MIG) OR GAS TUNGSTEN ARC (TIG) PROCESS USING FILLER

3. WELDED CONNECTIONS:

A. STAINLESS STEEL - TYPE 316, ASTM F 593, GRADE B8M, CLASS 1, HEAVY HEX.

2. BOLTED CONNECTIONS - BOLTS AND ANCHOR BOLTS:

B. SHEET AND PLATE: ASTM B 209, ALLOY 6061-T6.

A. SHAPES: ASTM B 308, ALLOY 6061-T6.

1. SECTIONS
STRUCTURAL ABBREVIATIONS:

DEFERRED DESIGN SUBMITTALS
BRACING, AND BALANCING.

THEIR DESIGN STRENGTH, PROTECT STRUCTURES AS REQUIRED BY SHORING, FACILITIES. UNTIL CONSTRUCTION IS COMPLETE AND MEMBERS HAVE ACHIEVED A. STRUCTURES HAVE BEEN DESIGNED FOR OPERATING LOADS ON COMPLETED

8. CONSTRUCTION LOADS:

STRUCTURAL DESIGN CRITERIA - GENERAL:

A. EARTHQUAKE DESIGN DATA FOR EACH STRUCTURE AS PER SPECIFICATIONS 01850.

7.EARTHQUAKE DESIGN DATA:

C. BASIC WIND SPEED (3 SEC GUST, 33 FEET ABOVE GROUND): 110 MPH.

B. WIND-BORNE DEBRIS REGION: NO
A. SPECIAL WIND REGION: NO

6.WIND DESIGN DATA:

5.FLUID PRESSURE LOADS: 63 PSF/FT (UNO).

E. CONCENTRATED AND IMPACT LOADS: SEE PLANS.

D. EQUIPMENT LOADS: SEE PLANS.

C. ROOF LIVE LOAD: SEE PLANS (20 PSF MINIMUM).

B. GRATING AND CHECKERED PLATE: 100 PSF (UNO).

A. FLOOR LIVE LOAD: SEE PLANS.

4.LIVE LOADS: (REDUCTIONS NOT USED)

3.DEAD LOADS: CALCULATED FOR STRUCTURE SELF-WEIGHT.

2.STRUCTURE RISK CATEGORY: III EXCEPT FOR TANK, RISK CATEGORY IV B. LOCAL AMENDMENTS: UKIAH CITY CODE.

A. 2022 CALIFORNIA BUILDING CODE (“CBC 2022”) WITH ASCE 7-16.

1. BUILDING CODE:

THESE OVERALL CRITERIA FOR THE SITE.

SEE DRAWINGS OF INDIVIDUAL STRUCTURES FOR SPECIFIC DESIGN CRITERIA BASED ON

2. WELDED WIRE FABRIC: ASTM A 1064.

C. ASTM A615 GRADE 80 SPIRALS FOR PILES AS INDICATED ON DRAWINGS.

B. WHERE INDICATED ON THE DRAWINGS: ASTM A 706.

A. TYPICAL: ASTM A 615, GRADE 60.

1. DEFORMED BARS:

THE DRAWINGS.

CONFORM TO THE FOLLOWING REQUIREMENTS UNLESS OTHERWISE INDICATED ON ITS MINIMUM SPECIFIED 28-DAY COMPRESSIVE STRENGTH.

STRUCTURE ABOVE IS COMPLETE AND (IN THE CASE OF CONCRETE) HAS CURED TO ARE COMPLETE, PROVIDE BRACING FOR WALLS. KEEP BRACING IN PLACE UNTIL THE

3. WHERE BACKFILL MUST BE PLACED AGAINST WALLS BEFORE STRUCTURES ABOVE FOR DETAILED AND LOCATION-SPECIFIC REQUIREMENTS.

2. SEE PROJECT SPECIFICATIONS AND NOTES ON DRAWINGS OF SPECIFIC STRUCTURES OTHERWISE INDICATED ON THE DRAWINGS.

1. MATERIALS SHALL CONFORM TO THE FOLLOWING REQUIREMENTS UNLESS 2) WELDING.
1) BOLTING.

C.STRUCTURAL ALUMINUM.
2) WELDING.
1) HIGH-STRENGTH BOLTING.

B.STRUCTURAL STEEL (CARBON AND STAINLESS).
4) ANCHORS - POST-INSTALLED MECHANICAL AND ADHESIVE.
3) ANCHORS - CAST-IN AND BUILT-IN ANCHOR BOLTS.
2) MEMBER SIZES/TYPES.
1) MEMBER LOCATIONS.

A.GENERAL ALL METALS:

5.DIVISION 5 METALS
G.PROTECTION AND CURING PROCEDURES.

F.GROUT AND GROUTING.

E.MORTAR AND JOINTS.

D.ANCHORS: BUILT-IN AND POST-INSTALLED.

C.REINFORCING STEEL.

B.MEMBER SIZES.

A.LOCATIONS.

4.DIVISION 4 MASONRY
F.PROTECTION AND CURING PROCEDURES.

E.CONCRETE MIX AND PLACEMENT.

D.ANCHORS: CAST-IN AND POST-INSTALLED.

C.REINFORCING STEEL.

B.FORMWORK AND MEMBER SIZES.

A.LOCATIONS.

3.DIVISION 3 CONCRETE:

D.FILL AND BACKFILL.

C.PREPARATION OF SOILS/SURFACES SUPPORTING CONSTRUCTION.

B.ADEQUACY OF EXPOSED SURFACE TO PROVIDE REQUIRED SUPPORT.

A.EXCAVATION DEPTH.

2.DIVISION 2 SITE CONSTRUCTION (EARTHWORK)
AND CONSTRUCTION. SEE SPECIFICATION SECTION 01455 FOR DETAILS.

1. SPECIAL INSPECTION IS REQUIRED FOR THE FOLLOWING STRUCTURAL MATERIALS A. 05500 TRASH RACK GRATING.

1. DIVISION 5 METALS.

DEFERRED DESIGN SUBMITTALS FOR THIS PROJECT INCLUDE:

SUBSEQUENTLY SUBMITTED TO THE BUILDING OFFICIAL.

THAT ARE TO BE REVIEWED BY THE REGISTERED DESIGN PROFESSIONAL AND

OF THE DESIGN THAT ARE NOT SUBMITTED AT THE TIME OF PERMIT APPLICATION, AND

AS DEFINED IN THE BUILDING CODE, DEFERRED DESIGN SUBMITTALS ARE PORTIONS

DISCREPANCIES
OPENINGS.

8.SEE STRUCTURAL DRAWINGS FOR LOCATIONS AND SIZES OF DOOR AND WINDOW D. SEE MECHANICAL DRAWINGS FOR EQUIPMENT PADS AND PIPE SUPPORTS.

AND ASSOCIATED STRUCTURAL REQUIREMENTS.

C. SEE MECHANICAL DRAWINGS FOR DETAILS OF PIPE PENETRATIONS, PIPE SUPPORTS, DIAMETER ARE NOT SHOWN ON THE STRUCTURAL DRAWINGS.

B. IN GENERAL, OPENINGS, EMBEDMENTS, AND PENETRATIONS LESS THAN 12 INCHES IN ITEMS AND EQUIPMENT FURNISHED.

A. CONFIRM SIZE AND LOCATIONS OF OPENINGS, PENETRATIONS AND EMBEDMENT FOR STRUCTURES.

CONDUITS, AND OTHER ITEMS THAT ARE EMBEDDED INTO OR PASS THROUGH

7.DRAWINGS PREPARED BY OTHER DISCIPLINES INCLUDE OPENINGS, ANCHORS, PIPES, TO WHICH SITE COORDINATES REFER ARE SHOWN ON THE STRUCTURAL PLANS.

6.SEE CIVIL DRAWINGS FOR STRUCTURE COORDINATES. POINTS ON THE STRUCTURES ORIENTATION REQUIRED AT THAT STRUCTURE.

CONCRETE) IS GENERALLY ARBITRARY. SEE DRAWINGS OF EACH STRUCTURE FOR REINFORCEMENT (WHETHER “LINES” OR “DOTS”ARE CLOSER TO THE FACE OF THE B. IN STRUCTURAL TYPICAL DETAILS, ORIENTATION OF BARS IN EACH MAT OF TITLES, EVEN WHEN NOT SPECIFICALLY REFERENCED ON THE DRAWINGS.

A. TYPICAL DETAILS ARE INTENDED TO APPLY AT LOCATIONS DESCRIBED BY THEIR

5.TYPICAL DETAILS ARE INCLUDED ON THE “TS” DRAWINGS.

B. SIZES AND LOCATIONS OF EQUIPMENT PADS FOR EQUIPMENT SELECTED.

A. DIMENSIONS AND WEIGHTS FOR EQUIPMENT SELECTED.

FOLLOWING BEFORE PREPARATION AND SUBMITTAL OF SHOP DRAWINGS:

DIMENSIONS, AND INFORMATION SHOWN ON THESE DRAWINGS. CONFIRM THE

IMMEDIATELY OF BETWEEN EXISTING CONDITIONS AND

4.VERIFY DIMENSIONS AND CONDITIONS BEFORE BEGINNING WORK. ADVISE ENGINEER SHOWS CONSTRUCTION AT AND BELOW ELEVATION 110.)
C. PLANS ARE TREATED AS HORIZONTAL SECTIONS. (I.E.: “PLAN AT ELEVATION 110” B. WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED SIZES.

A. SCREENED LINE WORK INDICATES EXISTING CONDITIONS.

3.PRESENTATION CONVENTIONS FOR STRUCTURAL DRAWINGS:

INDICATED IN THE GENERAL NOTES AND TYPICAL DETAILS.

2.UNLESS DETAILED, SPECIFIED, OR INDICATED OTHERWISE, CONSTRUCTION SHALL BE AS DISCIPLINES AND WITH THE SPECIFICATIONS.

1.USE STRUCTURAL DRAWINGS IN CONJUNCTION WITH PROJECT DRAWINGS BY OTHER PRIOR TO CASTING OF CONCRETE.

1. AFTER REINFORCING STEEL AND STRUCTURAL EMBEDS ARE IN PLACE, BUT C.ELEVATED SLABS
PRIOR TO CASTING OF CONCRETE.

1. AFTER REINFORCING STEEL AND STRUCTURAL EMBEDS ARE IN PLACE, BUT B.CONCRETE WALLS
PRIOR TO CASTING OF CONCRETE.

1. AFTER REINFORCING STEEL AND STRUCTURAL EMBEDS ARE IN PLACE, BUT A. FOUNDATIONS

2. ALL STRUCTURAL IN ALL AREAS:

CONSTRUCTION WHILE CORRECTIONS CAN BE MADE.

1. STRUCTURAL OBSERVATION IS REQUIRED DURING AND AT SPECIFIC STAGES OF STRUCTURAL OBSERVATION:

1. NORMAL DENSITY.

2. MINIMUM SPECIFIED CONCRETE COMPRESSIVE STRENGTH, f’c (AT 28 DAYS UNO).

A. STRUCTURES: “CLASS A”& DRILLED PIERS f’c = 4500 PSI.

B. FILL AND THRUST BLOCKS: “CLASS C” f’c = 2500 PSI.

C. PIPE ENCASEMENT: “CLASS A” f’c = 4500 PSI.

D. ELECTRICAL DUCT ENCASEMENT: “CLASS CE” f’c = 3000 PSI.

MATERIAL.

B.COVER PLATE AND ITS SEATS OR SUPPORTS SHALL BE OF THE SAME OTHERWISE NOTED.

A.ALUMINUM WITH TYPE 316 STAINLESS STEEL FASTENERS, UNLESS

3.COVER PLATES:

FASTEN GRATING TO SUPPORTS AS INDICATED IN S559/TYP.

C.UNLESS INDICATED ON THE DRAWINGS AS “REMOVABLE GRATING”, SECURELY B.GRATING AND ITS SEATS OR SUPPORTS SHALL BE OF THE SAME MATERIAL.

OTHERWISE NOTED.

A.ALUMINUM WITH TYPE 316 STAINLESS STEEL FASTENERS, UNLESS

2.GRATING:

A.ALUMINUM, EXCEPT WHERE OTHER MATERIALS ARE NOTED.

1. HANDRAILS AND GUARDRAILS:

METAL FABRICATIONS:

SLIDING COEFFICIENT OF FRICTION: 0.3 0.3
AT REST (PSF/FT): 65 65
ACTIVE (PSF/FT): 50 50

STATIC SEISMIC
SURCHARGE: EQUIVALENT TO 2 FEET OF SOIL ABOVE FINISHED GRADE.

B. LATERAL EARTH PRESSURE (UNO):

A. NET ALLOWABLE BEARING PRESSURE SEE PLANS.

INVESTIGATION REPORT.

2. FOUNDATION DESIGNS ARE BASED ON RECOMMENDATIONS IN THE GEOTECHNICAL REPORT NO: CRAWFORD FILE NO. 19-503.1 DATED: FEBRUARY 2023.

PREPARED BY: CRAWFORD AND ASSOCIATES.

PHASE 4 DESIGN PROJECT
TITLE: GEOTECHNICAL REPORT CITY OF UKIAH RECYCLED WATER PIPELINE

1. GEOTECHNICAL INVESTIGATION REPORT:
(AWS) A2.4.

2.WELDING: SYMBOLS: IN ACCORDANCE WITH AMERICAN WELDING SOCIETY FOR DEFINITION OF MATERIALS SHADING PATTERNS.

1. SEE DRAWING 00G03 FOR KEY TO DRAWING TITLES AND SECTION CUTS, AND

BAR SIZE)
# NUMBER (REINFORCING
T.O. TOP OF
O.F. OUTSIDE FACE
I.F. INSIDE FACE

EF EACH FACE PL PLATE

BO BOTTOM OF L ANGLE
REINFORCEMENT: OTHER:

ABBREVIATIONS HAVE THE MEANINGS LISTED.

WHEN USED ON THE STRUCTURAL DRAWINGS, THE FOLLOWING

4. ABBREVIATIONS FOR STRUCTURAL DRAWINGS:

THE ALUMINUM ASSOCIATION’S ALUMINUM DESIGN MANUAL, CURRENT EDITION.

B.ALUMINUM: ABBREVIATIONS AND DESIGNATIONS ARE IN ACCORDANCE WITH MANUAL, CURRENT EDITION.

AMERICAN INSTITUTE OF STEEL CONSTRUCTION’S STEEL CONSTRUCTION A.STEEL: ABBREVIATIONS AND DESIGNATIONS ARE IN ACCORDANCE WITH THE

3. STRUCTURAL MEMBERS:

PROJECT SPECIFICATIONS.

2. ABBREVIATIONS FOR NAMES OF TECHNICAL GROUPS MAY BE FOUND IN THE

1. SEE DRAWING 00G03 FOR GENERAL LIST OF ABBREVIATIONS USED ON DRAWINGS.

C. WELDS - SHIELDED METAL ARC PROCESS USING E70-XX ELECTRODES.

ASTM F 1554, GRADE 36 GALVANIZED.

ASTM F 593, STAINLESS TYPE 316
ANCHOR BOLTS WITH HEX FORGED HEAD.

B. BOLTS - STEEL TO CONCRETE OR MASONRY:

ASTM A 325 HIGH-STRENGTH BOLTS, WITH LOAD INDICATOR WASHERS.

A. BOLTS - STEEL TO STEEL:

2. CONNECTIONS:

SQUARE AND RECTANGULAR: ASTM A 500, GRADE B (Fy = 46 KSI) ROUND: ASTM A 500, GRADE B (Fy = 42 KSI)
E. HOLLOW STRUCTURAL SECTIONS:

D. PIPES: ASTM A 53, GRADE B (Fy = 35 KSI)
C. PLATES AND BARS: ASTM A 36 (Fy = 36 KSI)
B. SHAPES S, ST, M, MT, HP, C, MC, L: ASTM A 36 (Fy = 36 KSI) A. SHAPES W, WT: ASTM A 992 (Fy = 50 KSI)

1. SECTIONS
E
H
ANCHORS.

LOCATIONS OF REINFORCEMENT IN MEMBERS BEFORE DRILLING HOLES FOR ANCHORS. USE NON-DESTRUCTIVE TESTING EQUIPMENT TO IDENTIFY B.DO NOT CUT, DAMAGE, OR INTERRUPT EXISTING REINFORCEMENT TO INSTALL EVALUATION REPORT AND MANUFACTURER’S INSTRUCTIONS.

A.INSTALL IN FULL COMPLIANCE WITH ACCEPTED BUILDING CODE

4.POST-INSTALLED ANCHORS IN CONCRETE AND MASONRY:

ALUMINUM SURFACES AS SPECIFIED IN SECTION 09960.

B.WHERE ALUMINUM IS IN CONTACT WITH MASONRY OR CONCRETE, COAT ISOLATING SLEEVES AND WASHERS AS SPECIFIED IN SECTION 05190.

AND STAINLESS STEEL, OR ALUMINUM AND STEEL) PROVIDE
A.AT BOLTED CONNECTIONS THAT INCLUDE DIFFERENT METALS (E.G.: STEEL

3.INTERFACE BETWEEN MATERIALS:

BEING JOINED, AND FULL LENGTH OF THE JOINT.

A.FILLET WELDS: PER AWS CODE BASED ON THE THICKNESS OF THE MATERIALS

2.WELDED:

EDGE OF A PLATE OR STRUCTURAL ELEMENT.

C.WITH A DISTANCE OF AT LEAST 1 1/2 INCHES FROM CENTER OF BOLT TO ANY CENTER.

B.HAVING A MINIMUM OF 2 BOLTS, SPACED NOT CLOSER THAN 3 INCHES ON A.MADE USING 3/4-INCH DIAMETER BOLTS.

1. BOLTED:

STEEL, STAINLESS STEEL, AND ALUMINUM - CONNECTIONS:

A.FULLY GROUTED.

4.GROUTING:

DRAWINGS OR ACCEPTED IN ADVANCE BY THE ENGINEER.

3.WELDING OF REINFORCING IS NOT PERMITTED UNLESS DETAILED ON THE B.AT OPENINGS AS INDICATED IN S410/TYP.

A.AT CORNERS AND JUNCTIONS AS INDICATED IN S412/TYP.

2.PROVIDE REINFORCING:

1. SEE S400/TYP FOR MASONRY NOTES, INCLUDING LAP SPLICE LENGTHS.

MASONRY:

B. HOUSEKEEPING PAD FOR ELECTRICAL EQUIPMENT SEE S350/TYP.

A. EQUIPMENT PAD SEE S302/TYP.

8. CONCRETE PADS

7.FINISH CONCRETE AS SPECIFIED IN SECTION 03366.

AND EMBEDMENTS.

6.MAINTAIN MINIMUM 3 INCHES CLEAR CONCRETE COVER BETWEEN REINFORCING DRAWINGS OR ACCEPTED IN ADVANCE BY THE ENGINEER.

5.WELDING OF REINFORCING IS NOT PERMITTED UNLESS DETAILED ON THE B.AT OPENINGS - AS INDICATED IN S180/TYP.

ADDED BARS WHERE INDICATED ON THE DRAWINGS.

A.AT CORNERS AND JUNCTIONS - AS INDICATED IN S144/TYP, SUPPLEMENT WITH

4.PROVIDE REINFORCING:

SPECIFICATION 03102 FOR CHAMFERS.

3.PROVIDE CHAMFER AT EXPOSED EDGES OF CAST-IN-PLACE CONCRETE. SEE ACCEPTANCE BY THE ENGINEER BEFORE FORM LAYOUT.

2.SUBMIT LOCATIONS OF CONSTRUCTION JOINTS NOT SHOWN ON THE DRAWINGS FOR LENGTH REQUIREMENTS FOR REINFORCING.

1. SEE S101/TYP FOR CONCRETE NOTES, INCLUDING CLEAR COVER AND LAP SPLICE CONCRETE:

SPECIAL INSPECTION
E. STORAGE POND: “CLASS A” f’c = 5000 PSI.

Digitally signed by Jitesh
Contact Info: Carollo Engineers, Inc
Date: 2023.04.07 14:22:13-07'00'

Page 294 of 1800 ends

4'-6"
3'-6"

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 86094
P
lotD
ate: 07-APR
-2023 11:40:56
AM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
85S01
LA
S
T
SAVED
B
Y:

PROJECT NO. FILE NAME:

STRUCTURAL
8660F10 8660F1085S01.dgn
C
85S02
A 3/16"=1'-0"
CLARIFIER NO.4 CLARIFIER NO.3 CLARIFIER NO.2
FILTER NO.4 FILTER NO.3 FILTER NO.2 FILTER NO.1
#
GENERAL NOTES:

KEY NOTES:

AWT CLARIFIER/FILTER PLAN
B
85S02
8660F1085S100
CLARIFIER NO.1
1 85S02
WORK SEQUENCING).

SPECIFICATION SECTION 01140 FOR CONSTRAINTS AND POSSIBLE

DONE DURING THE MEDIA REPLACEMENT PROCESS (REFER TO

2. ACCESSING ALL OF THE SURFACE REQUIRES THIS WORK TO BE CONTRACTOR TO FIELD VERIFY EXISTING DIMENSIONS.

1. BACKGROUND IS BASED ON THE 1994 RECORD DRAWINGS.
kjackson
D
85S02 2 (TYP)
1 (TYP)
KP
TU
56 TYP
(TYP) S304
(TYP)
(TYP
)
SECTION 09960.

SURFACES OF THE COLLECTION TROUGHS PER SPECIFICATION

2. CONTRACTOR TO FULLY RECOAT THE INTERIOR AND EXTERIOR SECTION 09960 DURING THE MEDIA REPLACEMENT PROCESS.

SURFACES OF THE CLARIFIER/FILTER TANKS PER SPECIFICATION

1. CONTRACTOR TO FULLY RECOAT INTERIOR AND EXTERIOR
JKN
Digitally signed by Jitesh
Contact Info: Carollo Engineers, Inc
Date: 2023.04.07 14:23:26-07'00'

Page 295 of 1800 ends

4'-6"
1'-0"
3'-6"
1'-0"

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 86094
P
lotD
ate: 07-APR
-2023 11:41:01
AM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
85S02
LA
S
T
SAVED
B
Y:

PROJECT NO. FILE NAME:

STRUCTURAL
8660F10 8660F1085S02.dgn
#
GENERAL NOTES:

KEY NOTES:

AWT CLARIFIER/FILTER
1 85S01
866F1085S02A
B
85S01
C
85S01

SECTIONS AND PHOTO
3/8"=1'-0"
3/8"=1'-0"
8660F1085S9303
8660F1085S9304
1 kjackson
3/8"=1'-0"
8660F1085S9305
D
85S01

COLLECTION TROUGH
3 2 4

1. REFER TO GENERAL NOTES ON 00S01.

TU
KP
57 TYP
(TYP) S304
TYP
(TYP) S304
(TYP)
(TYP
)
(TYP)
(TYP
)
TROUGH.

4. CONTRACTOR TO FIELD VERIFY DIMENSIONS OF COLLECTION
SECTION 09960.

SURFACES OF THE CLARIFIER/FILTER TANKS PER SPECIFICATION

3. CONTRACTOR TO FULLY RECOAT THE INTERIOR AND EXTERIOR SECTION 09960.

SURFACES OF THE COLLECTION TROUGHS PER SPECIFICATION

2. CONTRACTOR TO FULLY RECOAT THE INTERIOR AND EXTERIOR AWT CLARIFIER/FILTER TANK HAS SIX ANCHOR BOLTS.

1. REPAIR AND REPLACE EXISTING ANCHOR BOLTS AS NEEDED. EACH JKN
Digitally signed by Jitesh
Contact Info: Carollo Engineers, Inc
Date: 2023.04.07 14:24:27-07'00'

Page 296 of 1800 ends

5'-0"
18'-0"13'-0" 1'-0"
1'-0" 8'-0"
10'-0"
1'-6"
10"
4'-0"
2'-10" 3'-0"

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 86094
P
lotD
ate: 07-APR
-2023 11:41:16
AM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1 LA
S
T
SAVED
B
Y:

PROJECT NO. FILE NAME:8660F1091S01.dgn

STRUCTURAL
PLANS
8660F10
91S01
(TYP)
D
A 3/8"=1'-0"
866F1091S100
B 3/8"=1'-0"
866F1091S101
91S02
D
91S02
#
GENERAL NOTES:

KEY NOTES:

TU
(TYP
)
(TYP)
(TYP
)
AND PIPE PENETRATION WITH MECHANICAL DRAWINGS.

1. CONTRACTOR SHALL VERIFY SIZE, LOCATION OF PIPE,
1 C
91S02
1'-6"
KP
(TYP)
12" DIA OPENING
C
91S02

PAU PUMP STATION

PAU PUMP STATION - FOUNDATION PAU PUMP STATION - TOP

1. FOR GENREAL STRUCTURAL NOTES, REFER TO DRAWING 00S01. kjackson
58 JKN
SPECIFICATION 05500

ACCESS LADDER PER
SPECIFICATION 08320. PROVIDE

BILCO TYPE J-AL OR SIMILAR, SEE
SINGLE LEAF ACCESS HATCH 3'-0".

Digitally signed by Jitesh
Contact Info: Carollo Engineers, Inc
Date: 2023.04.07 14:25:58-07'00'

Page 297 of 1800 ends

LAP
2'-10"
#5@12"
1'-0"

FINISHED GRADE
H2E
#8@12"

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 86094
P
lotD
ate: 07-APR
-2023 12:20:28
PM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1 LA
S
T
SAVED
B
Y:

PROJECT NO. FILE NAME:8660F1091S02.dgn

STRUCTURAL
8660F10
91S02
#
GENERAL NOTES:

KEY NOTES:
1 TOP OF BERM 581.00
TOC 565.00
C
91S01 3/8"=1'-0"
866F1091SS300
D
91S01 3/8"=1'-0"
866F1091SS300

SECTIONS
GRADE

FINISHED
TYP
S180
TU
KP
(TYP
)
SPLIC
E
TOC 582.00
TOP OF CURB 583.00

LAP SPLICE(TYP)

PAU PUMP STATION
#6@12" T&B
#6@12" T&B
(TYP)
#7@12" EF
INVERT 569.00
T&B H2E
#8@12"

1. FOR GENERAL STRUCTURAL NOTES, REFER TO DRAWING 00S01. kjackson
59 JKN
2 GEOTECHNICAL REPORT.

2. OVER EXCAVATION, COMPACTION AND AGGREGATE BASE PER
PENETRATION WITH MECHANICAL DRAWINGS.

1. CONTRACTOR SHALL VERIFY SIZE, LOCATION OF PIPE, AND PIPE 2 (2) #5 CIRCULAR BAR
TYP
(W/WSTP) S140
(TYP) EF
#7@12"
Digitally signed by Jitesh
Contact Info: Carollo Engineers, Inc
Date: 2023.04.07 14:26:57-07'00'

Page 298 of 1800 ends

2'-0"
1'-0"
6"
2'-8"
1'-0"
5'-0" 1'-6" 1'-0"
1'-0"
2'-0" 2'-0" 2'-0" 1'-6" 2'-0"EM
B
ED
2'-0"
9"
6'-0"

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 86094
P
lotD
ate: 07-APR
-2023 11:40:44
AM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1 LA
S
T
SAVED
B
Y:

PROJECT NO. FILE NAME:8660F1091S03.dgn

STRUCTURAL
8660F10
91S03
#
GENERAL NOTES:

KEY NOTES:

PLAN AND SECTION
16"-PVC
1/4
TYP
1 BEN MEADOWS, AND FORESTRY SUPPLIERS.

STEEL PIPE OR FIBERGLASS. MANUFACTURERS INCLUDE STEVENS,

RECOMMENDED MATERIALS INCLUDE PORCELAIN ENAMELED IRON,
TO MINIMIZE MOVEMENT DUE TO WIND AND WAVE ACTION.

THAT RESIST RUST AND DISCOLORATION, AND STURDY ENOUGH

1. THE STAFF GAUGES SHOULD BE MADE OF A DURABLE MATERIAL(S) SCALE:

FILE:

F
-

SECTION
3/4" = 1'-0"
8660F1000S301
F
-
16"-PVC
1 INV 569.03
TU
1 TOE OF EMBANKMENT
AT 3:1 TO MATCH BASIN SLOPE

FACE OF STRUCTURE - SLOPE

COUPLING

TRANSITION

FLEXIBLE
TYP

SST BATTEN,
316 SST
HSS 4 x 4 x 1/4"
TYP

SST BATTEN,
PL 6 x 16 x 1/4"
PL 3 x 9 x 1/4"
#5@12 EW

TRASH RACK
APRON

FLUSH WITH CONCRETE OUTLET AT
ENCASED IN CONCRETE. CUT ELBOW
INSTALL 16" DIA 90 DEG PVC ELBOW

FLEXIBLE COUPLING
#5 @ 12" EWEF
EL 570.00

BOTTOM OF POND
1 KP

PAU PUMP STATION INLET STRUCTURE
SCALE:

FILE:

E
3/4" = 1'-0"
866F1091S102
PLAN
91C08
kjackson
60 JKN
GEOTECHNICAL REPORT.

3. OVER EXCAVATION, COMPACTION AND AGGREGATE BASE PER
PERFORATED SUPPORT SLEEVE.

FOUNDATION TO BE USED TO SUPPORT LEVEL TRANSDUCER

2. INTERMEDIATE DEPTH GAUGE TO BE LOCATED AS SHOWN IN C-26.

DIMENSION TO BE DETERMINED AFTER GRATE IS APPROVED.

PROFESSIONAL ENGINEER IN STATE OF CALIFORNIA. FINAL

CALCULATIONS STAMPED AND SIGNED BY A REGISTERED

CONTRACTOR SHALL PROVIDE SHOP DRAWINGS AND
DESIGNED AND DETAILED FOR A LIVE LOAD OF 100 PSF.

1. CONTRACTOR SHALL PROVIDE STAINLESS STEEL TRASH GRATE 3 3
Digitally signed by Jitesh
Contact Info: Carollo Engineers, Inc
Date: 2023.04.07 14:28:22-07'00'

Page 299 of 1800 ends

1'-0"
5'-0" 1'-0"
2'-0" 3'-4"
1'-0"
6"
1'-0"
1'-0"
6'-0"
2'-0"
2'-0" 2'-0" 2'-0" 1'-6" 2'-0"EM
B
ED
9"

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 86094
P
lotD
ate: 07-APR
-2023 11:40:51
AM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1 LA
S
T
SAVED
B
Y:

PROJECT NO. FILE NAME:8660F1095S01.dgn

STRUCTURAL
8660F10
95S01
GENERAL NOTES:

PLAN AND SECTION
SCALE:

FILE:

J
-

SECTION
3/4" = 1'-0"
8660F1000S302
J
-
(TYP
)
16"-PVC
16"-PVC
1 1
TU
(TYP
)
# KEY NOTES:

BEN MEADOWS, AND FORESTRY SUPPLIERS.

STEEL PIPE OR FIBERGLASS. MANUFACTURERS INCLUDE STEVENS,

RECOMMENDED MATERIALS INCLUDE PORCELAIN ENAMELED IRON,
TO MINIMIZE MOVEMENT DUE TO WIND AND WAVE ACTION.

THAT RESIST RUST AND DISCOLORATION, AND STURDY ENOUGH

1. THE STAFF GAUGES SHOULD BE MADE OF A DURABLE MATERIAL(S) 316 SST 1
HSS 4 x 4 x 1/4"
AT 3:1 TO MATCH BASIN SLOPE

FACE OF STRUCTURE - SLOPE

COUPLING

TRANSITION

FLEXIBLE
TYP

SST BATTEN,

TOE OF EMBANKMENT
TYP

SST BATTEN,

TRASH RACK
#5@12 EW #5 @ 12" EWEF
1/4
TYP
1 PL 6 x 16 x 1/4"
PL 3 x 9 x 1/4"

TRASH RACK

FLEXIBLE COUPLING
KP
INV 568.46

PAU INLET STRUCTURE
SCALE:

FILE:

H
3/4" = 1'-0"
866F1091S103
PLAN
91C07
kjackson
61 JKN
GEOTECHNICAL REPORT.

3. OVER EXCAVATION, COMPACTION AND AGGREGATE BASE PER
PERFORATED SUPPORT SLEEVE.

FOUNDATION TO BE USED TO SUPPORT LEVEL TRANSDUCER

2. INTERMEDIATE DEPTH GAUGE TO BE LOCATED AS SHOWN IN C-26.

DIMENSION TO BE DETERMINED AFTER GRATE IS APPROVED.

PROFESSIONAL ENGINEER IN STATE OF CALIFORNIA.. FINAL

CALCULATIONS STAMPED AND SIGNED BY A REGISTERED

CONTRACTOR SHALL PROVIDE SHOP DRAWINGS AND
DESIGNED AND DETAILED FOR A LIVE LOAD OF 100 PSF.

1. CONTRACTOR SHALL PROVIDE STAINLESS STEEL TRASH GRATE 3 3
BOTTOM OF POND EL 570.78
Digitally signed by Jitesh
Contact Info: Carollo Engineers, Inc
Date: 2023.04.07 14:29:07-07'00'

Page 300 of 1800 ends

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 86094
P
lotD
ate:3/23/2023
3:00:58
PM
JKN
JLG
KP
99S01
62 STRUCTURAL

ELECTRICAL BUILDING

FOUNDATION PLAN
8660F1099S01.dw
g
kjackson 8660F10
24'-0"
14'-0"

ELECTRICAL ROOM
3'-4" 4'-4"
6'-8" 1'-4"
B
8660F1001S100

FOUNDATION PLAN
1/2" = 1'-0"
(TYP)
1'-0"
(TYP
)
1'-0"
P
99S03

FULLY GROUTED
12" CMU WALL (TYP)
TYP
CR314
GENERAL NOTES:

KEY NOTES:

MECHANICAL EQUIPMENT.

6. COORDINATE OPENING SIZE AND LOCATION WITH
MANUFACTURER'S ANCHORAGE REQUIREMENTS.

MECHANICAL DRAWINGS AND EQUIPMENT

EQUIPMENT PADS WITH ELECTRICAL AND

5. COORDINATE LOCATION AND DIMENSIONS OF ALL
FINISHED WITH WATER REPELLANT.

4. EXTERIOR CONCRETE MASONRY UNITS TO BE
S451/TYPE AND S461/TYPE.

S410/TYPE, S412/TYPE, S430/TYPE, S440/TYPE,

3. FOR MASONRY DETAILS, SEE DETAILS S400/TYPE,

2. FOR DOOR SCHEDULES, REFER TO DRAWING 99A01.

DRAWING 00S01.

1. FOR GENERAL STRUCTURAL NOTES, REFER TO
#
FXE
FXE
4 1
2 101
3 3
101-1
101-2
EQUIPMENT REQUIREMENTS.

REFERENCE ELECTRICAL DRAWINGS FOR
REFER TO SPECIFICATION SECTION 10520.

FIRE EXTINGUISHER PER DETAIL AN400/TYPE.

SPECIFICATION SECTION 08110.

HOLLOW METAL DOOR AND FRAME REFER TO
IN FULLY GROUTED CMU WALL.

PROVIDE #5@16" EACH WAY EACH FACE REBAR
UNIT. REFER TO SPECIFICATION SECTION 04220.
12''x8''x16'' STANDARD CONCRETE MASONRY
TYP
S350
TYP
S350
(TYP)
2 (TYP)
MCJ
(TYP)
12'-0"
G
99A02
H
99A02
E
99A02
F
99A02

TYP ALL AROUND
TOC 602.25
(TYP)
MCJ
TYP
CR314
1'-0"
TOC 602.25
1'-4"

1. 2.

3. 4.

Digitally signed by Jitesh
Contact Info: Carollo Engineers, Inc
Date: 2023.04.07 14:29:55-07'00'

Page 301 of 1800 ends

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 86094
P
lotD
ate:3/23/2023
3:45:47
PM
GENERAL NOTES:

S720/TYP.

WIDTH. PROVIDE ROOF OPENING AS PER DETAIL
SHALL BE LIMITED TO 12" IN DIAMETER OR
MANUFACTURER. MAXIMUM ROOF OPENING

EQUIPMENT AND APPROVED HVAC

LOCATION AS REQUIRED WITH MECHANICAL

5. COORDINATE ROOF OPENING SIZE AND
DIRECTION.

4. INDICATES METAL DECK SPAN
DRAWING 00S01.

3. FOR GENERAL STRUCTURAL NOTES SEE
TO DRAWING 98A01.

2. FOR GENERAL ARCHITECTURAL NOTES, REFER
ROOF DESIGN DEAD LOAD = 20 PSF
ROOF DESIGN LIVE LOAD = 20 PSF

1. ROOF LOADING:

JKN
JLG
KP
99S02
63 STRUCTURAL

ELECTRICAL BUILDING

ROOF FRAMING AND ROOF PLANS
8660F1099S02.dw
g
kjackson 8660F10
C
8660F1001S101

ROOF FRAMING
1/2" = 1'-0"
4 EQ SPACES @5'-6" = 22'-0"
1 2
P
99S03
TYP
AC310
TYP
S708
TYP
S451
AROUND

TYP ALL
HPT 615.25
LPT 615.00
3 S
LO
PE
1/4'PER
FOO
T
2 4
12'-0"
CL
P
99S03
TYP
AG225

W/ CAGE
TYP
AG222
(TYP)
TAPERED RIGID INSULATION.

SLOPE OF THE ROOF SHALL BE ACHIEVED BY
RECOMMENDED BY MANUFACTURER.

SEAL SHALL INCLUDE CAULKING AND PLATE AS
WEATHERTIGHT CONDUIT PENETRATION SEAL.

ENGINEERS REVIEW A WATERPROOF AND

EXISTING CONDITIONS AND PROVIDE FOR

CONTRACTOR SHALL COORDINATE WITH
PROVIDED BY THE CONTRACTOR.

MEET APPLICABLE BUILDING CODES SHALL BE

FRAMING AND ATTACHMENTS ANCHORED TO
STRUCTURAL CALCULATIONS. SECONDARY

PROVIDE SEISMIC BRACING AS REQUIRED BY
SUSPENDED FROM ROOF PER MFR DETAIL.

REQUIREMENTS AND PLACEMENT. FCU

REFERENCE HVAC DRAWINGS FOR EQUIPMENT
MANUFACTURER.

CRICKET AS RECOMMENDED BY
PER DETAIL AG160/TYP.

PROTECTIVE BOARD AND RIGID INSULATION

TPO MEMBRANE ROOFING SYSTEM OVER
SPECIFICATION SECTION 07700.

AG220/TYP IN ACCORDANCE WITH

ALUMINUM COPING OVER PARAPET PER DETAIL
1 1/2" DEEP 18 GAUGE METAL DECK.

D
8660F1001S102
ROOF
1/2" = 1'-0"
W 10x30
W 10x30
W 10x30
3 E
Q SPAC
E
S
@
4'-8"=14'-0"
TYP
S451
(TYP)
W 10x30
W 10x30

MCJ (TYP)
TYP
S502

EXTERIOR
12" CMU WALL (TYP)

MCJ (TYP)
(TYP)
12'-0"
12'-0"
W 10x30W 10x30
TYP
S701
# KEY NOTES:

1. 2.

3. 4.

5. 6.
7 7.

Digitally signed by Jitesh
Contact Info: Carollo Engineers, Inc
Date: 2023.04.07 14:30:40-07'00'

Page 302 of 1800 ends

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 86094
P
lotD
ate:4/5/202311:36:37
AM
GENERAL NOTES:

DRAWING 00S01.

2. FOR GENERAL STRUCTURAL NOTES SEE
TO DRAWING 99A01.

1. FOR GENERAL ARCHITECTURAL NOTES, REFER
JKN
JLG
KP
99S03
64 STRUCTURAL

ELECTRICAL BUILDING

SECTION
8660F1099S03.dw
g
kjackson 8660F10
P
99S01 1/2" = 1'-0"
86600F1001S300
TOC 602.25
EL 618.50 SUBGRADE PREPARATION.

1. REFER TO GEOTECHNICAL REPORT FOR
1 SLOPE

STEEL BEAM PER PLAN
#6@12" EW T&B
HOUSEKEEPING PADS.

LOCATIONS AND DIMENSIONS OF

2. REFER TO ELECTRICAL DRAWINGS FOR
TOS 616.25
2 (TYP)
TYP
AG227
TYP
AG225
TYP
AG160

CMU WALLS PER PLAN
12" FULLY GROUTED
2'-4"
99S02
# KEY NOTES:

Digitally signed by Jitesh
Contact Info: Carollo Engineers, Inc
Date: 2023.04.07 14:31:26-07'00'

Page 303 of 1800 ends

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 86094
P
lotD
ate: 07-APR
-2023 11:42:14
AM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
JKN
NGB
KP
99S04
65 STRUCTURAL

RECYCLED WATER PUMP STATION

PLAN AND SECTIONS
8660F1099S04.dwg
kjackson
8660F10
LA
S
T
SAVED
B
Y:

PROJECT NO. FILE NAME:

Q
8660F1001S130
1/4" = 1'-0"
R
- 1/2" = 1'-0"
8660F1001S330
GENERAL NOTES:

AND LOCATION.

2. REFER TO SHEET 99M02 FOR PUMP DETAILS
DRAWING 00S01.

1. FOR GENERAL STRUCTURAL NOTES, REFER TO
VERIFY DIMENSIONS WITH MANUFACTURER.

END REBAR WITH STD HOOK.

OPENING WITH MECHANICAL.

CONTRACTOR TO COORDINATE SIZE OF THE
HEIGHT OF THE CURB WALL IS 2'-0".

CURB WALL WITH PUMP MANUFACTURER. MAX

CONTRACTOR TO COORDINATE HEIGHT OF THE
TYP
S180
2 #6@12" EF VERT
(TYP)
3 1
#6@12" EF CIRC (TYP)
R
-

PER MFR
TYP
S130
#5@8" CIRCULAR

BARS EF (TYP)
#4 STIRRUPS
@8" (TYP)
1'-0"

PROVIDE

TEMPORARY

SHORING AS

NEEDED AND

CLSM BACKFILL
6" COMPACTED ABC

PROVIDE TEMPORARY

SHORING AS NEEDED

AND CLSM BACKFILL
10" COMPACTED ABC
SCARIFY 8" AND COMPACT TO
95% RELATIVE COMPACTION
1'-3"
1'-3"

W/O WSTP
1" EXP JT
TYP
S140
(TYP)

NATIVE SOIL
EL 587.08
S
-
S
- 1/2" = 1'-0"
8660F1001S330
#6@12" EW T&B
(TYP
)
10'-0"
51'-10"
#6@12" EF CIRC (TYP)
#6@12" EF VERT (TYP)
7'-6"
7'-6"
4 5'-6" 6'-4"
4 LP EL 602.33
HP EL 602.60
10'-0" 5'-6" 4'-6"
20'-0"
LP EL 602.33

SLOPE SLOPE
FG 602.00
TYP
S141
# KEY NOTES:

1. 2.

3. 4.
#6@12" EW T&B
1'-3"
Digitally signed by Jitesh
Contact Info: Carollo Engineers, Inc
Date: 2023.04.07 14:32:21-07'00'

Page 304 of 1800 ends

2'-0"
R47'-6"

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
AB
CD
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
AB
CD
E
F
G G
®
PURPOSES.

CONSTRUCTION

IS NOT TO BE USED FOR
2023, CA PE NO. 76832. IT
OF BRIAN W. AVON, APRIL

UNDER THE AUTHORITY

PURPOSE OF BIDDING

RELEASED FOR THE

THIS DOCUMENT IS
CHANGE DURING CONSTRUCTION.

DRAWINGS WILL BE PROVIDED AS A DESIGN
NOT FOR CONSTRUCTION. CONSTRUCTION
THIS DRAWING IS FOR BID PURPOSES ONLY.

PlotDate:3/23/20234:28:55PM
GENERAL NOTES:

CONSTRUCTION.

12. FOR BIDDING PURPOSES, NOT FOR
TANK DESIGNER.

11. FINAL TANK DESIGN TO BE DETERMINED BY THE
DESIGN AND APPROVED BY THE OWNER.

HATCHES TO BE COORDINATED WITH TANK

10. FINAL COORDINATES FOR THE ACCESS
PIPING.

9. SEE SHEET 99C19 FOR CONTINUATION OF YARD
CONCRETE TANK.

DETAILED DESIGN FOR THE PRESTRESSED

8. COORDINATE ALL PIPE PENETRATIONS WITH
S110/TYP.

7. FOR CONSTRUCTION JOINT SEE DETAIL
WITH CLOSED LOOP ALL AROUND JOINTS.

S107/TYP. WATERSTOP SHALL BE CONTINUOUS

6. FOR WATERSTOP SEE DETAILS S106/TYP AND
NOTED OTHERWISE.
316/316L FOR WELDING FABRICATIONS UNLESS

5. ALL STAINLESS STEEL SHALL BE A MINIMUM OF
CABLES, JOINTS, ETC. ARE NOT SHOWN.

STEEL, PRESTRESSING CONNECTIONS, SEISMIC

WATERSTOPS, BEARING PADS, REINFORCING

ASPECTS OF THE TANK, INCLUDING SHOTCRETE
FOR AWWA D110, TYPE I TANK. DETAILED

4. DRAWINGS SHOW THE GENERAL ARRANGEMENT
SPECIFICATION 13207.

WITH THE REQUIREMENTS SET FORTH IN

QUALIFIED TANK CONTRACTOR IN ACCORDANCE

TANK DESIGNED AND CONSTRUCTED BY

STRAND WOUND, PRESTRESSED CONCRETE

3. THE TANK SHALL BE AN AWWA D110, TYPE I,
CRITERIA.

2. SEE DRAWING 99S07 FOR THE TANK DESIGN
DRAWING 00S01.

1. FOR GENERAL STRUCTURAL NOTES, REFER TO
NGB
KP
99S05
66 STRUCTURAL

STORAGE TANK

FOUNDATION PLAN
8660F1099S05.dwgkjackson 8660F10 T 8660F1001S110 FOUNDATION 1/8" = 1'-0" 8'-0"
5°
5° 5° 10°

RIDGE LINE OF QUADRANT

BOUNDARY BELOW (TYP)

SEE CIVIL DRAWINGS FOR

COORDINATE POINT

INTERIOR SST

LADDER W/ FALL

PROTECTION SYSTEM

EXTERIOR ALUM LADDER

SWALE LINE
(TYP ALL AROUND)
16" PW
16" RW

TANK INLET

TANK OUTLET
W
99S07
X
99S07
X
99S07
V
99S07
24"x2'-6" SPOOL PIECE CENTERED
IN WALL WITH (2) 24" BLIND FLG,

MATCH CL OF OVERFLOW

TO BOOSTER PUMP
STATION SEE DWG 99C19

FOR CONTINUATION
4" RW

FOR CONTINUATION
SYSTEM SEE DWG 99C19

FROM DISTRIBUTION
16" OF
RISER

WASHDOWN
24"x2'-6" SPOOL PIECE CENTERED
IN WALL WITH (2) 24" BLIND FLG,

MATCH CL OF OVERFLOW
51°

5.73°
33 .27°
15°
15°
45°

TANK INLET
FLOW
FLOW
Y
99S08

WATER SAMPLING STATION

PRESSURE TRANSMITTER CONNECTIONS

FUTURE CHLORINATOR CONNECTION
16" OF
5 99S08

CAST-IN-PLACE

TYPE I CONCRETE

COREWALL
PER AWWA D110

TANK FOOTING

COLS AS

REQUIRED
SQUARE

FOOTING
(TYP) AS REQUIRED
15'-0"

ASREQUIRED
15'-0"
JKN

Page 305 of 1800 ends

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
AB
CD
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
AB
CD
E
F
G G
®
PURPOSES.

CONSTRUCTION

IS NOT TO BE USED FOR
2023, CA PE NO. 76832. IT
OF BRIAN W. AVON, APRIL

UNDER THE AUTHORITY

PURPOSE OF BIDDING

RELEASED FOR THE

THIS DOCUMENT IS
CHANGE DURING CONSTRUCTION.

DRAWINGS WILL BE PROVIDED AS A DESIGN
NOT FOR CONSTRUCTION. CONSTRUCTION
THIS DRAWING IS FOR BID PURPOSES ONLY.

PlotDate:3/23/20234:29:43PM
GENERAL NOTES:

CONSTRUCTION.

9. FOR BIDDING PURPOSES, NOT FOR
TANK DESIGNER.

8. FINAL TANK DESIGN TO BE DETERMINED BY THE
S110/TYP.

7. FOR CONSTRUCTION JOINT SEE DETAIL
WITH CLOSED LOOP ALL AROUND JOINTS.

S107/TYP. WATERSTOP SHALL BE CONTINUOUS

6. FOR WATERSTOP SEE DETAILS S106/TYP AND
NOTED OTHERWISE.
316/316L FOR WELDING FABRICATIONS UNLESS

5. ALL STAINLESS STEEL SHALL BE A MINIMUM OF
CABLES, JOINTS, ETC. ARE NOT SHOWN.

STEEL, PRESTRESSING CONNECTIONS, SEISMIC

WATERSTOPS, BEARING PADS, REINFORCING

ASPECTS OF THE TANK, INCLUDING SHOTCRETE
FOR AWWA D110, TYPE I TANK. DETAILED

4. DRAWINGS SHOW THE GENERAL ARRANGEMENT
SPECIFICATION 13207.

WITH THE REQUIREMENTS SET FORTH IN

QUALIFIED TANK CONTRACTOR IN ACCORDANCE

TANK DESIGNED AND CONSTRUCTED BY

STRAND WOUND, PRESTRESSED CONCRETE

3. THE TANK SHALL BE AN AWWA D110, TYPE I,
CRITERIA.

2. SEE DRAWING 99S07 FOR THE TANK DESIGN
DRAWING 00S01.

1. FOR GENERAL STRUCTURAL NOTES, REFER TO
NGB
KP
99S06
67 STRUCTURAL

STORAGE TANK

ROOF PLAN
8660F1099S06.dwgkjackson 8660F10 U 8660F1001S110 ROOF1/8" = 1'-0"

ALUM ROOF VENT
4'x8' DOUBLE LEAF

ALUM ACCESS HATCH

EXTERIOR ALUM LADDER W/
"SAF-T-CLIMB" LADDER SYSTEM
& CLIMBING DEVICE OR EQUAL

PROVIDE HORIZONTAL LIFELINE

FALL PROTECTION SYSTEM W/

CABLE & ANCHOR POINTS AS
REQD, SEE NOTE 5 (TYP)

ROOF DRAIN SCUPPER W/
GALV STEEL PIPE (TYP 10

PLACES EQUALLY SPACED)
W
99S07
V
99S07

AS REQUIRED

ASREQUIORED

TANK WALL

ROOF SLAB
JKN

Page 306 of 1800 ends

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
AB
CD
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
AB
CD
E
F
G G
®
PURPOSES.

CONSTRUCTION

IS NOT TO BE USED FOR
2023, CA PE NO. 76832. IT
OF BRIAN W. AVON, APRIL

UNDER THE AUTHORITY

PURPOSE OF BIDDING

RELEASED FOR THE

THIS DOCUMENT IS
CHANGE DURING CONSTRUCTION.

DRAWINGS WILL BE PROVIDED AS A DESIGN
NOT FOR CONSTRUCTION. CONSTRUCTION
THIS DRAWING IS FOR BID PURPOSES ONLY.

PlotDate:4/5/202311:41:16AM
GENERAL NOTES:

8. FOR BIDDING PURPOSES, NOT FOR CONSTRUCTION.

7. FINAL TANK DESIGN TO BE DETERMINED BY THE TANK DESIGNER.

EVER APPLICABLE .

6. CONTRACTOR TO PROVIDE SHORING FOR ALL EARTHWORK WHERE SHALL BE CONTINUOUS WITH CLOSED LOOP ALL AROUND JOINTS.

5. FOR WATERSTOP SEE DETAILS S106/TYP & S107/TYP. WATERSTOP MINIMUM CONCRETE COVER AT TANK CONNECTION).

PLACEMENT OF CONCRETE FOR PIPE ENCASEMENT (VERIFY

4. INSPECTION OF REBAR BY ENGINEER REQUIRED PRIOR TO

2. PERIMETER 4000 PSF 1. CENTER 2000 PSF
i. ALLOWABLE GROSS BEARING PRESSURE
d. GEOTECHNICAL DESIGN DATA:
7-16 CH 21.2 METHOD 1. * SITE-SPECIFIC GROUND MOTION HAZARD ANALYSIS PER ASCE vii. LONG-PERIOD TRANSITION PERIOD, TL: 8 SECONDS (ANCHORED FLEXIBLE-BASE TANK)
vi. RESPONSE MODIFICATION FACTOR, R: 3.25 v. SEISMIC DESIGN CATEGORY: D iv. DESIGN SPECTRAL RESPONSE ACCELERATION, SD1*: 1.58g
iii. DESIGN SPECTRAL RESPONSE ACCELERATION, SDS*: 1.48g ii. SEISMIC IMPORTANCE FACTOR, Ie: 1.50 i. RISK CATEGORY: IV c. EARTHQUAKE DESIGN DATA (ASCE 7-16):
ii. EXPOSURE: C i. ULTIMATE DESIGN WIND SPEED, Vult (3-SEC GUST): 104 MPH b. WIND DESIGN DATA:
300 LBS CONCENTRATED LOAD.
a. ROOF LIVE LOAD: 40PSF (NON-REDUCIBLE) WITH A
FOR THE TANK DESIGN.

CODE. SEE SPECIFICATION 13027 FOR ADDITIONAL DESIGN CRITERIA STRUCTURAL DESIGN CRITERIA PER 2019 CALIFORNIA BUILDING

3. THE TANK DESIGN SHALL, AS A MINIMUM, MEET THE FOLLOWING

2. SEE ADDITIONAL NOTES ON SHEET 99S05.

1. FOR GENERAL STRUCTURAL NOTES, REFER TO DRAWING 00S01. 99S07
68 STRUCTURAL

STORAGE TANK

SECTIONS AND DETAILS
8660F1099S07.dwg 8660F10
115'-0" (INSIDE DIAMETER)
TOW 625.00TOC 624.25
621.75

SPRING LINE
V
99S05 1/8" = 1'-0"
8660F1001S310
16" RW
OUTLET
16" RW
INLET
3- 3/8" = 1'-0"
8660F1001S310
4- 1/2" = 1'-0"
8660F1001S310
X
99S05 3/8" = 1'-0"
8660F1001S310

TANK OUTLET PIPE
W
99S05 1/8" = 1'-0"
8660F1001S310
1% SLOPE
3- 3- 4- 1
4 1% SLOPE 1% SLOPE

TO SWALE

BEGIN SLOPE
2'-0"
10'-0"

TO SWALE

BEGIN SLOPE
2'-0"

FINISH GRADE, SEE CIVIL DWGS
2'-0"MIN
16" W
SLOPE
2%

MAX OPERATION
WATER EL 620.00
SPRING
LINE
HPT
595.50
LPT 595.00
(SWALE LINE

ALL AROUND)
TOC 595.08
(ALL AROUND)
TOC 595.08

CONCRETE WALL

FOOTING AND SLAB

CONCRETE WALL

FOOTING AND SLAB

CONCRETE WALL

ASSEMBLY

ABC LEVELING COURSE

OVER COMPACTED EARTH

SUBGRADE COMPACTED
TO 95% OF MAXIMUM DRY
DENSITY PER ASTM D1557

ABC LEVELING COURSE OVER
COMPACTED EARTH SUBGRADECOMPACTED TO 95% OF MAXIMUM
DRY DENSITY PER ASTM D1557
10" OF SCARIFIED NATIVE MATERIAL
COMPACTED TO 95% RELATIVE COMPACTION

AND MOISTURE CONDITIONED

NATIVE SUBGRADE

CONCRETE WALL

ASSEMBLY

ANGLE POINT

PER OSHA

WHERE SHORING

IS USED (TYP)

SAFE CONSTRUCTIONSLOPE (TYP)

STRUCTURAL BACKFILL

UNLESS OTHERWISE

SPECIFIED COMPACT TO
95% RELATIVE

COMPACTION
(8) #6 CONTINUOUS

REINFORCMENT

CONCRETE WALL

FOOTING AND SLAB

EXTERIOR ALUMINUM

LADDER WITH
"SAF-T-CLIMB"

LADDER SYSTEM AND

CLIMBING DEVICE

OR EQUAL

ALUMINUMANTI-CLIMB DOOR

INTERIOR LADDER WITH
"SAF-T-CLIMB" DEVICE

PROVIDED REMOVABLE

TOP EXTENSION SECTION

ALUMINUM GUARDRAIL
4'x8' DOUBLE LEAF

ALUMINUM ACCESS HATCH
30-MIL MEMBRANE LINER
6-MIL POLYETHYLENE

SHEETING AT

CONTRACTOR OPTION
1 4
TYP
MP140
SAFE

CONSTRUCTION

SLOPE (TYP)

EXTEND CONCRETE

WALL FOOTING AS

REQUIRED

STRUCTURAL BACKFILL

UNLESS OTHERWISE

SPECIFIED COMPACT TO
95% RELATIVE COMPACTION

ENCASEMENT

REINFORCING STEEL
MUST BE INSTALLED 2"MINIMUM FROM ANY

PORTION OF PIPE

WATERSTOP

ANCHORED

FLEXIBLE-BASE

CONNECTION
6 99S08
5 99S08
SLOPE
2%
99S06

WATERSTOP (TYP)

FILTER FABRIC

WATERSTOP

ANCHORED

FLEXIBLE BASE

CONNECTION
JKN
NGB
KP
kjackson

Page 307 of 1800 ends

(TYP)
1'-0"

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
AB
CD
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
AB
CD
E
F
G G
®
PURPOSES.

CONSTRUCTION

IS NOT TO BE USED FOR
2023, CA PE NO. 76832. IT
OF BRIAN W. AVON, APRIL

UNDER THE AUTHORITY

PURPOSE OF BIDDING

RELEASED FOR THE

THIS DOCUMENT IS
CHANGE DURING CONSTRUCTION.

DRAWINGS WILL BE PROVIDED AS A DESIGN
NOT FOR CONSTRUCTION. CONSTRUCTION
THIS DRAWING IS FOR BID PURPOSES ONLY.

PlotDate:4/5/202311:47:28AM
99S08
69 STRUCTURAL

STORAGE TANK

SECTION AND DETAILS
8660F1099S08.dwgkjackson 8660F10
TYP
MP080
TYP
MP310
3'-0"
4" FLG TEE W/ (2) 4"

BLIND FLANGES,
TAPPED 1 12" IPT, (2) 1
1 2" BRASS NIPPLES, (2)
1 12" HOSE VALVES W/

HANDWHEEL

OPERATOR AND CAP

AND CHAIN
TYPE 304 SST
BAFFLE 1/4" PLATE

NOTCH TO FIT

INSIDE PIPE
SCALE:FILE:
5 DETAIL
99S07 3/8" = 1'-0"
8660F1000S310

TANK INLET
SCALE:FILE:
6 DETAIL
99S07 3/8" = 1'-0"
8660F1000S310

TANK OUTLET
SCALE:FILE:

Y SECTION
99S08 3/8" = 1'-0"
8660F1000S310

TANK OVERFLOW
SCALE:FILE:
7 DETAIL
99S05 3/8" = 1'-0"
8660F1000S310

TANK WASHDOWN RISER
SCALE:FILE:
8 DETAIL - 3/4" = 1'-0"
8660F1000S310

ANTI-VORTEX

TOP OF INFLUENT
16" FLARE
TOC 595.08
3'-0" 10'-0" MIN
CL 591.00
FLOW
TYP
MP140
10'-0" MIN 3'-0"
TOC 595.08
FLOW
16" LR 90° ELBOW
CL 591.00

SPOOL PIECE

PIPE FLOORPENETRATION

FLUSH TO FLOOR
8- 16" RW
TYP
MP310
TYP
MP140
16" RW
TOP OF OVERFLOW 520.00
16" FLARE
6'-0"MAX
TYP
MP250
(TYP)
16" OF
CL 604.00
INV 597.00
TYP
CS202 36"x36" CATCH BASIN
3'-4"
16" DUCKBILL

CHECK VALVE
4" RW
CL 599.00
CL 591.00
TYP
MP140
16" RW
PLAN

SECTION
16" RW
TYPE 304 SST
BAFFLE 1/4" PLATE
16" OF

PIPE CONTINUATION
SEE DWG C01 FOR
SEE DWG 99C19 FOR

PIPE CONTINUATION
SEE DWG 99C19 FOR

PIPE CONTINUATION
JKN
NGB
KP

Page 308 of 1800 ends

(TYP)
1'-0"

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
AB
CD
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
AB
CD
E
F
G G
®
PURPOSES.

CONSTRUCTION

IS NOT TO BE USED FOR
2023, CA PE NO. 76832. IT
OF BRIAN W. AVON, APRIL

UNDER THE AUTHORITY

PURPOSE OF BIDDING

RELEASED FOR THE

THIS DOCUMENT IS
CHANGE DURING CONSTRUCTION.

DRAWINGS WILL BE PROVIDED AS A DESIGN
NOT FOR CONSTRUCTION. CONSTRUCTION
THIS DRAWING IS FOR BID PURPOSES ONLY.

PlotDate:3/27/202311:14:25AM
GENERAL NOTES:

UTILITIES SHALL BE EXPOSED.

7. PRIOR TO DRILLING OF PIERS, ALL KNOWN
SECITON 03300.

6. FOR CONCRETE CLASS, SEE SPECIFICATION
ENGINEER.

REQUIREMENTS AND AS APPROVED BY THE
TIE IN ACCORDANCE WITH ACI 318

5. IF LAPS ARE REQUIRED FOR SPIRALS, LAP AND
80,000 PSI (ASTM615 GR 80).

4. PROVIDE SPIRALS WITH YIELD STRENGTH OF
TERMINATOR RATHER THAN STANDARD HOOK.

3. CONTRACTORS OPTION TO PROVIDE BAR END
A.H-20 LIVE LOAD
DESIGN LIVE LOADS:

2. BRIDGE STRUCTURAL DESIGN CRITERIA.

DRAWING 00S01.

1. FOR GENERAL STRUCTURAL NOTES, REFER TO
NGB
KP
99S09
70 STRUCTURAL
BRIDGE

PLAN AND SECTION
8660F1099S09.dwgkjackson 8660F10
A
8660F1001S120
3/8" = 1'-0"

NEW PREFAB RAILCAR

BRIDGE AND ANCHORAGEBY CONTRACTOR
EXIST
BRIDGE

FND (TYP)
1 99S02
B- 3/8" = 1' - 0"
8660F1001S320
(TYP)
9'-4"
(TYP)
3'-4"
(TYP)
3'-0"
(TYP)
6'-0"

B- (TYP
)
1'-0"
FIN GR 645.00
PROFESSIONAL ENGINEER.

SIGNED BY A CALIFORNIA REGISTERED

CALCULATIONS AND DETAILS STAMPED AND

TALL GUARD RAIL, SHOP DRAWINGS,
CONTRACTOR SHALL PROVIDE MINIMUM 3'-6"
REGISTERED PROFESSIONAL ENGINEER.

STAMPED AND SIGNED BY A CALIFORNIA

DRAWINGS, CALCULATIONS AND DETAILS

CONTRACTOR SHALL PROVIDE SHOP
TOPPING AND A CROSS SLOPE OF 2% MAXIMUM.

BRIDGE WITH 3" MINIMUM ASPHALT CONCRETE
PRE-MANUFACTURED 12' WIDE STEEL RAILCAR
CONTRACTOR TO VERIFY DIMENSION.

MINIMUM BEARING SEAT WIDTH = 20 INCHES.

C
99S02
2 10'-0"
10'-0"
1 99S02
2 (TYP)
3'-0"
12" PIPE PER CIVIL
DRAWING 99C14
90'-0"
(TYP MAX)
4'-0" D
99S02
(MAX)
1'-6"
(MAX)
1'-6"
4 3
5'-0" 1'-0"
4'-0"
TYP
MP100
TYP
P602
ELBOW FLxMJ
12" DI 90 DEG
FLxFL
4'-0" DI SPOOL
TYP
MP898
12" GV FLxFL
JOINT (BY OTHERS) FLxFL

BALANCED EXPANSION
12" FLEX TEND FORCE 1'-0" DI SPOOL FLxFL
1'-0" 5'-0"
4'-0"
TYP
P602
TYP
MP100
TYP
MP898
SPOOL FLxFL
4'-0" DI
ELBOW FLxMJ
12" DI 90 DEG JOINT (BY OTHERS) FLxFL

BALANCED EXPANSION
12" FLEX TEND FORCE
1'-0" DI SPOOL FLxFL
12" GV FLxFL
# KEY NOTES:

1. 2.

3. 4.

JKN

Page 309 of 1800 ends

3"MINCLR
6"MIN
1" TYP
1"TYP
2"
2"
3"
4"MAX
3"MIN

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
AB
CD
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
AB
CD
E
F
G G
®
PURPOSES.

CONSTRUCTION

IS NOT TO BE USED FOR
2023, CA PE NO. 76832. IT
OF BRIAN W. AVON, APRIL

UNDER THE AUTHORITY

PURPOSE OF BIDDING

RELEASED FOR THE

THIS DOCUMENT IS
CHANGE DURING CONSTRUCTION.

DRAWINGS WILL BE PROVIDED AS A DESIGN
NOT FOR CONSTRUCTION. CONSTRUCTION
THIS DRAWING IS FOR BID PURPOSES ONLY.

PlotDate:3/24/20233:28:56PM
GENERAL NOTES:

BEND INTO THE CONCRETE CORE AT ENDS.
(2) EXTRA TURNS AND A 135 DEGREE HOOK

ENSURE THAT THE SPIRAL IS TERMINATED WITH

LENGTH ON SITE PER NEW PIER LENGTHS,

8. FOR REBAR CAGES THAT ARE REDUCED IN
2460.

LOAD TESTING PER SPECIFICATION SECTION
ADDITIONAL INFORMATION. CONDUCT PIER
SPECIFICATION SECTIONS 2467A AND 2466B FOR
PRESSURE-GROUTED PILES. SEE

HOLE CONCRETE PILES OR AUGURED

7. ALL PILES SHALL BE CAST-IN-PLACE DRILLED
UTILITIES SHALL BE EXPOSED.

6. PRIOR TO DRILLING OF PIERS, ALL KNOWN
SECTION 03300.

5. FOR CONCRETE CLASS, SEE SPECIFICATION
ENGINEER.

REQUIREMENTS AND AS APPROVED BY THE
TIE IN ACCORDANCE WITH ACI 318

4. IF LAPS ARE REQUIRED FOR SPIRALS, LAP AND
80,000 PSI (ASTM615 GR 80)

3. PROVIDE SPIRALS WITH YIELD STRENGTH OF
TERMINATOR RATHER THAN STANDARD HOOK.

2. CONTRACTORS OPTION TO PROVIDE BAR END
DRAWING 00S01.

1. FOR GENERAL STRUCTURAL NOTES, REFER TO
JKN
NGB
KP
99S10
71 STRUCTURAL
BRIDGE

SECTIONS AND DETAILS
8660F1099S10.dwgkjackson 8660F10
C
S01 3/4" = 1' - 0"
8660F1001S320
E- 3/4" = 1' - 0"
8660F1001S320
3'-0"

TIES SEE SCHEDULE

PIER SCHEDULE ON THIS SHEET

FOR REINFORCEMENT SEE DRILLED
EXTEND SPIRALS 12 INCHES INTO PIER CAP.

CONNECTION OF W8X.

REQUIRED FOR FULL BEARING AND
SIDES WITH A 1/4" THICK FILLET WELD IF
WELDED TO BRIDGE BEAM AND W8X ON ALL
PROVIDE 3/8" THICK OVERSIZED STEEL PLATE
(TYP).

HOLES TO ALLOW LONGITUDINAL MOVEMENT
PER MANUFACTURER. PROVIDE SLOTTED
BRIDGE BEARING PLATE AND ANCHOR BOLTS LONGITUDINAL BAR.

AROUND THE PERIMETER ENCLOSING THE

CIRCULAR TIES SHALL BE STAGGERED
MINIMUM OVERLAP. ENDS OF ADJACENT
ENGAGE A LONGITUDINAL BAR WITH 6"

DEGREE MINIMUM STANDARD HOOKS AND
TIES ENDS SHALL TERMINATE WITH 135
1 #5@8" EW EF (TYP)

DRILLED PIER SCHEDULE
LABEL
(FT)

DIAMETER
(FT)

PIER LENGTH

REINFORCEMENT

VERTICAL

TIES OR SPIRAL
P1 3'-0" 45'-0" (16) #10 (2) #5@6"

BUNDLED SPIRAL
1- 3/4" = 1' - 0"
8660F1001S320
E- PREFAB RAIL CAR BRIDGE AND ANCHORAGE BY CONTRACTOR (8) #6@8" T&B (TYP) 2 FIN GR 645.00 FIN GR 637.00
EL 635.00EL 632.17
EL 635.00EL 632.17
PIER P1 (TYP)
PIER P1 (TYP)
D
S01 3/4" = 1' - 0"
8660F1001S320
W8x18
L3x3x3/8
W8x18

PREFAB RAIL CAR

BY CONTRACTOR
1" NEOPRENE PAD

PIPE STRAP
12" PIPE PER CIVIL
DRAWING 99C14
3/8" GUSSET

CUT TO FIT
(TYP)
3/4" DIA A325-N BOLTS

IN STD HOLE (TYP)
2'-3" MAX
1/4"
1/4"
1/4"
#6@8" T&B
#6@8" T&B
#6@8" T&B

CONTRACTOR TO MATCH
EXISTING GRADE. REPLACEEXISTING PATH TO MATCH

BRIDGE ELEVATION (TYP)
3 # KEY NOTES:

1. 2.

3. 4
1/4"
TYP

4.

Page 310 of 1800 ends

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 84405
P
lotD
ate: 06-APR
-2023 1:26:34
PM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
00M01
LA
S
T
SAVED
B
Y:

PROJECT NO. FILE NAME:8660F1000M01.dgn

MECHANICAL
8660F10
CE
CE
V
V
K

SILENT CHECK VALVE

ECCENTRIC PLUG VALVE

MUD VALVE (PLAN VIEW)
ELBOW, 11.25 DEGREE
ELBOW, 22.5 DEGREE

SWING CHECK VALVE

FLEXIBLE COUPLING ADAPTER

DISMANTLING JOINT

WAFER CHECK VALVE

GLOBE VALVE
ANCHOR
CAP
CROSS

LATERAL
TEE
UNION

FLANGED COUPLING ADAPTER

GROOVED END ADAPTER

FLANGED COUPLING ADAPTER

FLEXIBLE COUPLING

EXPANSION COMPENSATOR
ELBOW, 90 DEGREE

LUBRICATED PLUG

BALL CHECK VALVE

KNIFE GATE VALVE

MIXING VALVE

DUAL CHECK VALVE

DIAPHRAGM VALVE
FLANGE
ELBOW, 45 DEGREE

EXP JOINT

PINCH VALVE

PLUG VALVE
(RUBBER GASKET)

FLANGED JOINT

ADAPTER SIDE

THRUST TIES

WITH THRUST TIES

WELDED JOINT

CONTROL VALVE

GATE VALVE

BALL VALVE

CHARACTERIZED BALL

BUTTERFLY VALVE

TEE DOWN

METAL BELLOWS EXP JOINT

FLEXIBLE COUPLING WITH

ELASTOMER BELLOWS

HUB & SPIGOT JOINT

GROOVED END JOINT

CONCENTRIC REDUCER

ELBOW DOWN

ELBOW UP
TEE UP

LATERAL DOWN

LATERAL UP
VALVE
(RESTRAINED)

PUSH-ON JOINT
3-WAY GLOBE TYPE

NEEDLE VALVE

PREVENTER

CHECK BACKFLOW
M
S
X
M
PUMP: ROTARY
PUMP: METERING
CAVITY
PUMP: CENTRIFUGAL
PUMP: PLUNGER

VENTURI TUBE
STRAINER: WYE TYPE
STRAINER: WYE TYPE

WITH BLOWOFF
WEIR

SLUICE GATE
PUMP: DIAPHRAGM
VALVE: TELESCOPING
VALVE: PLUG ECCENTRIC
VALVE: SWING CHECK
VALVE: AIR RELIEF
VALVE: ANGLE

PRESSURE-REDUCING REGULATOR

PULSATION DAMPENER
PRIMARY FLOW ELEMENT:

PUMP: RECIPROCATING
PUMP: PROGRESSIVE
X = U - ULTRASONIC
X = TH - THERMAL
X = R - ROTAMETER
X = M - MAGNETIC
X = C - CORIOLIS
PRIMARY FLOW ELEMENT:

PUMP: SUBMERSIBLE
PUMP: SCREW
FLUME
PRIMARY FLOW ELEMENT:

ORIFICE PLATE
X = PT - PITOT TUBE

ROTARY CHEMICAL

RUPTURE DISK

SLIDE GATE

SAMPLE PORT

SIGHT GLASS
FEEDER
PRIMARY FLOW ELEMENT:

X = T - TURBINE
X = P - PROPELLER
PRIMARY FLOW ELEMENT:

X = D - DENSITY
VALVE: CONE
VALVE: GATE

FLOW SWITCH

FIRE HYDRANT
RADAR
PRIMARY LEVEL ELEMENT:

THERMOMETER

W/ EXTERNAL PRESSURE TAP

REGULATOR W/EXTERNAL

BACKPRESSURE REGULATOR
VALVE: THREE WAY

BACKPRESSURE REGULATOR
PUMP: PERISTALTIC TUBE METERING
VALVE: THREE WAY
VALVE: THREE WAY

MOTOR OPERATED

SELF-CONTAINED

AIR OPERATED

SOLENOID OPERATED
VALVE: BUTTERFLY
VALVE: BALL CHECK
VALVE: BALL
VALVE: PLUG CONCENTRIC
VALVE: PRESSURE RELIEF
VALVE: VACUUM

PRESSURE TAP

PRESSURE-REDUCING

PRESSURE-REDUCING
VALVE: PINCH
VALVE: NEEDLE
REGULATOR: SELF-CONTAINED
VALVE: FLAPPER CHECK
VALVE: DIAPHRAGM
VALVE: FOUR WAY
VALVE: GLOBE
VALVE: HOSE

DIFFUSER

AIR VENT

OR FLUSHING

RECIPROCATING
DRAIN
BLOWER

QUICK DISCONNECT
PRIMARY LEVEL ELEMENT:

HIGH PRESSURE AIR

BATCHMETER

AIR OR CHEMICAL
COMPRESSOR:

ELECTRIC MOTOR

EXPANSION JOINT,

EQUIPMENT DRAIN
PUMP: VERTICAL LIFT
PIPE REDUCER: CONCENTRIC

FLEXIBLE VIBRATION

COMPRESSOR/TURBINE

CALIBRATION COLUMN

DIAPHRAGM SEAL
JOINT

EJECTOR OR EDUCTOR

FLAME ARRESTER

FLOOR DRAIN

FLAME ARRESTER WITH

PRESSURE

THERMALLY OPERATED VALVE
FAN: EXHAUST/SUPPLY
FILTER
WEIR

FLOAT SWITCH

ULTRASONIC
PRIMARY LEVEL ELEMENT:

PRIMARY LEVEL ELEMENT:

OIL OR MOISTURE TRAP
GAUGE: PRESSURE
GAUGE: DIFFERENTIAL
MIXER
PRIMARY LEVEL ELEMENT:

BUBBLER

BASKET STRAINER
PRIMARY LEVEL ELEMENT:

ELECTRODE
PRIMARY LEVEL ELEMENT:

FLUID

DOUBLE LINE SINGLE LINE DESCRIPTION DOUBLE LINE SINGLE LINE DESCRIPTION SINGLE LINE DESCRIPTION SINGLE LINE DESCRIPTION SINGLE LINE DESCRIPTION

PROCESS LINE SYMBOLS

LINE SYMBOLS
CONTINUATION TO DWG NO.

CONTINUATION FROM DWG NO.

UNIQUE IDENTIFIER

CHEMICAL INJECTION POINT

CONTINUATION TAG

PIPE ABOVE OR BELOW GROUND
DEMO

EXISTING
FUTURE

OR STRUCTURE

PIPE UNDERNEATH SLAB

PRIMARY PROCESS FLOW IN CHANNEL

SECONDARY PROCESS FLOW IN CHANNEL

PRIMARY PROCESS FLOW IN PIPE

SECONDARY PROCESS FLOW IN PIPE

PIPE DESIGNATOR

EQUIPMENT / VALVE TAG

PIPE SIZE FLOW STREAM

PIPE MATERIAL CHANGE
M

XXX-XX-XXXX
X" XXX
C
B
A
DWG NO.

CHEMICAL
(FOT. FOB)

ECCENTRIC REDUCER
(FOT, FOB)
PIPE REDUCER: ECCENTRIC
VALVE: THREE WAY

PIPING SYMBOLS MECHANICAL SYMBOLS IDENTIFICATION SYMBOLS

INVERTED COLUMN
eparker

GENERAL MECHANICAL SYMBOLS
JD
72 Digitally signed by Matthew C. Kallevant
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 16:56:50-04'00'

Page 311 of 1800 ends

XX" INSULATION (INSIDE) XX" INSULATION (OUTSIDE)

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 84405

HUMIDISTAT
THERMOSTAT 60" ABOVE FINISH FLOOR

ROOF VENT OR ROOF FAN

UNIT HEATER (HORIZONTAL TYPE)

INLINE/AXIAL FAN

ROOF/SIDEWALL FAN

CENTRIFUGAL FAN

DIRECT EXPANSION COIL

COOLING COIL

CONTROL PANEL

SOLENOID VALVE

GAS HEATER

ELECTRIC HEATER
FILTER

MOTOR OPERATED VALVE

UNIT HEATER (VERTICAL TYPE)

TURNING VANES

FLEXIBLE DUCT

ACCESS DOOR

FLEXIBLE CONNECTION

SIDE MOUNT DEVICE

ROUND DUCT

DIRECTION OF FLOW

TO SPACE

FROM SPACE
20x12 16 DIA
20x12 16x8
AD
AD
R
20x12
20x12
12x20

MOTORIZED

BACKDRAFT

BALANCING
APPEAR ON THE CONTRACT DRAWINGS.

ABBREVIATIONS. NOT ALL ITEMS SHOWN HERE
NOTE:THIS IS A GENERAL LIST OF SYMBOLS AND
OR
FD

DAMPERS

SUPPLY RETURN EXHAUST
M
M

FIRE W/ ACCESS DOOR

DUCT SMOKE DETECTOR

9. PROVIDE TURNING VANES IN ALL ELBOWS. (SHOWN OR NOT)

8. COORDINATE FINAL LOUVER SIZE AND LOCATION WITH ARCHITECTURAL AND STRUCTURAL DRAWINGS.

OUT AT ALL LOCATIONS WHERE THEY APPLY.

7. TYPICAL DETAILS SHALL BE USED FOR ALL PERMANENT WORK EVEN THOUGH THEY ARE NOT CALLED

6. THIS IS A GENERAL LIST OF SYMBOLS. NOT ALL ITEMS SHOWN HERE APPEAR ON CONTRACT DRAWINGS.

FURNISHED AND INSTALLED BY THE CONTRACTOR AS SPECIFIED.

OTHERWISE DETAILED ON THE DRAWINGS ALL PIPE AND DUCT SUPPORTS SHALL BE DESIGNED,

5. NOT ALL AND ONLY CERTAIN TYPES OF SUPPORTS ARE SHOWN ON THE HVAC DRAWINGS. UNLESS AS SHOWN ON THE TYPICAL DETAILS.

4. UNLESS OTHERWISE SHOWN ON THE DRAWINGS ALL FLOOR SLAB AND WALL PENETRATIONS SHALL BE HVAC SYSTEMS TO PROVIDE THE COMPLETE SYSTEM.

NOT EVERY FITTING AND OFFSET IS SHOWN. THE CONTRACTOR SHALL FURNISH, INSTALL AND TEST ALL ETC. REQUIRED FOR THE COMPLETE SYSTEM. SMALL PIPING IS SHOWN APPROXIMATELY TO SCALE BUT

3. HVAC PIPING AND DUCTWORK DRAWINGS DO NOT SHOW ALL DRAINS, VENTS, OFFSETS AND FITTINGS PIPE TO OTHER TYPES OF METALLIC PIPING.

2. DIELECTRIC COUPLINGS, FLANGES OR UNIONS SHALL BE INSTALLED AT ALL CONNECTIONS OF COPPER STRUCTURAL DRAWINGS.

EQUIPMENT SHALL BE SET ON CONCRETE PADS CONFORMING TO DETAILS SHOWN ON THE TYPICAL SHALL BE DETERMINED BY THE CONTRACTOR FOR THE EQUIPMENT FURNISHED. ALL FLOOR MOUNTED

1. SIZES OF EQUIPMENT PADS INDICATED ON THE DRAWINGS ARE APPROXIMATE. EXACT DIMENSIONS

FIRST NUMBER IS TOP

DUCT SECTION, NEGATIVE PRESS

FIRST NUMBER IS TOP

DUCT SECTION, POSITIVE PRESS

RISE, (D) DROP

ELEVATION CHANGE (R)

IS SIDE SHOWN

DUCT SIZE- FIRST NUMBER

COMPRESSOR

A/C OR HEAT PUMP

TRANSFER GRILLE

ARROWS INDICATE FLOW DIRECTION

SUPPLY DIFFUSER OR GRILLE

ARROWS INDICATE FLOW DIRECTION

RETURN DIFFUSER OR GRILLE

ARROWS INDICATE FLOW DIRECTION

EXHAUST DIFFUSER OR GRILLE

OR DUCT TAKEOFF

REGISTER, GRILLE, DIFFUSER

BOTTOM MOUNT DEVICE

TRANSITION

RECTANGULAR

RECTANGULAR TO

ROUND TRANSITION

RECTANGULAR TO

PRESSURE)

DIAGONAL FOR NEGATIVE

ELBOW TURNED UP (USE ONE

POSITIVE PRESSURE DUCT -

PRESSURE)

DIAGONAL FOR NEGATIVE

ELBOW TURNED DOWN (USE ONE

POSITIVE PRESSURE DUCT -

INSTALLATION

CONFIRM ORIENTATION OF

SMOKE DETECTOR

INSTALLATION

CONFIRM ORIENTATION OF
SMOKE

INSTALLATION

CONFIRM ORIENTATION OF

COMBINATION SMOKE AND FIRE
T
S
M
H

TYPE OF REGISTER
SIDEWALL-ADJUSTABLE;
CFM FLOW PATTERN;

BOOT (IF REQ'D)

NECK SIZE

C-CORNER
(AS DESCRIBED IN

OR GRILLE
400/4
SR-1(B)/12x12

SPECIFICATIONS)

LEGEND FOR REGISTERS & GRILLES

PRESSURE DIFFERENTIAL SWITCH
PD

AIR FLOW SWITCH AFS
C
C
D
X

DUCT UP THRU ROOF OR FLOOR

ABBREVIATIONS

BDD BACKDRAFT DAMPER

BOD BOTTOM OF DUCT

AFF ABOVE FINISHED FLOOR

BD BALANCING DAMPER
AT
CH

DG DOOR GRILLE

EA EXHAUST AIR

FA FOUL AIR
MD

RA RETURN AIR

RR RETURN REGISTER OR GRILLE

SA SUPPLY AIR
SD
SFD
SR

SMOKE DAMPER OR SMOKE DETECTOR

SMOKE & FIRE DAMPER COMBINATION

SUPPLY REGISTER, GRILLE OR DIFFUSER

AFS AIR FLOW SWITCH

AHU AIR HANDLING UNIT

BLR BOILER

EF EXHAUST FAN

EUH ELECTRIC UNIT HEATER
NC
NO

NORMALLY CLOSED

NORMALLY OPEN

MAU MAKEUP AIR UNIT

MOTORIZED DAMPER

OA OUTSIDE AIR

PPU POSITIVE PRESSURIZATION UNIT

WUH WATER UNIT HEATER

AC AIR CONDITIONING

CO CARBON MONOXIDE DETECTOR

CHILLER
CT
CS
CU

COOLING TOWER

CURRENT SENSOR

CONDENSING UNIT

DP DIFFERENTIAL PRESSURE

ECU EVAPORATIVE COOLING UNIT

FD FIRE DAMPER

FCU FAN COIL UNIT

GUH GAS UNIT HEATER

HP HEAT PUMP

OCF ODOR CONTROL FAN

SF SUPPLY FAN

VAV VARIABLE AIR VOLUME

LOUVER/BRICK VENT - OPERABLE

LOUVER/BRICK VENT - FIXED

DUCT DOWN

DUCT UP

CURRENT SENSOR CS

SIZE VARIES
(INSIDE) OR (OUTSIDE)

DUCT INSULATION
@
D
A
B
C
E
F
M
P
R
S
N
O
W
G
H
V

NOTES DUCTWORK SYMBOLS EQUIPMENT SYMBOLS REGISTERS, GRILLES & LOUVERS SYMBOLS

FEATURE SYMBOL FEATURE SYMBOL FEATURE SYMBOL
CE
CE
JD
00M02
73 MECHANICAL

GENERAL HVAC NOTES, ABBREVIATIONS,

AND SYMBOLS
8660F1000M02.dw
g 8660F10
P
lotD
ate:2/20/2023
3:24:43
PM
eparker
Digitally signed by Matthew C. Kallevant
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 16:56:55-04'00'

Page 312 of 1800 ends

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 84405
P
lotD
ate: 06-APR
-2023 1:26:11
PM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
60M01
eparker
LA
S
T
SAVED
B
Y:

PROJECT NO. FILE NAME:

AL

MECHANICAL

PLANS AND SECTION
8660F10 8660F1060M01.dgn
#
GENERAL NOTES:

KEY NOTES:

A
B
- 1/4" = 1'-0"
1/4" = 1'-0"
8660F1060M9101
8660F1060M9301
B
-
EX-24" FE
EX-24" FE
24" BFV
EX-12" FE

DRAIN RISER
EX-42" FE

FACILITY

CHLORINATION
FROM
EX-24" FE
EX-42" FE
EX-42" FE
EX-24" FE
EYY

DECHLORINATION STRUCTURE
M
M

STRCTURE

DECHLORINATION
24" BFV
24" BFV
EX-2" SO2
1 2
1 2
# KEY TAGS:

1. FCV-60100 DCL STRUCTURE VALVE 1
AE-60101

2. FCV-60102 DCL STRUCTURE VALVE 2

3. C
-
3 C

NOT TO SCALE

PUMP STATION

CAROUSEL
TO
2 RIVER

RUSSIAN
TO
2 3
9 CHLORINE ANALYZER 4
PUMP 5
SAMPLE
FROM
PUMP 4
SAMPLE
FROM
5 6
8 7

SCHEMATIC
8660F1060M9101
(STP)

CONTACT BASINS

CHLORINE
FROM
(STP)
(STP)
4 (STP)
INV 564.5±

3. SEE CIVIL DRAWINGS FOR YARD PIPING CONTINUATION.

AND ORIENTATION OF VALVES AND VALVE ACTUATORS.

2. CONTRACTOR SHALL COORDINATE WITH THE CITY, THE LOCATION, BOLTS, AND GASKETS.

EXISTING PIPING COMPONENTS. DO NOT REUSE THE OLD NUTS,

FOR ALL CONNECTIONS, INCLUDING REINSTALLATION OF ANY

1. CONTRACTOR SHALL PROVIDE NEW NUTS, BOLTS, AND GASKETS MATCHES THE EXISTING CONFIGURATION.

9. CONTRACTOR SHALL PROVIDE A DRAIN CONFIGURATION THAT

8. TIE INTO EXISTING THREE-WAY VALVE.

DIMENSIONS.

7. EXISTING CONCRETE PAD. CONTRACTOR TO FIELD VERIFY
AUTOMATED ACTUATION VALVE.

CHLORINATED SAMPLES. PUMP SENDS FLOW TO A THREE-WAY

6. SAMPLE PUMP 4 IS A ROTARY PUMP THAT IS USED FOR
AUTOMATED ACTUATION VALVE.

DECHLORINATED SAMPLES. PUMP SENDS FLOW TO A THREE-WAY

5. SAMPLE PUMP 5 IS A SUBMERSIBLE PUMP THAT IS USED FOR INFORMATION.

AND INSTRUMENTATION (60N01) DRAWINGS FOR ADDITIONAL
EXISTING ENCLOSURE IN PLACE. REFER TO ELECTRICAL (60E01) 17505. THE EXISTING ENCLOSURE IS TO REMAIN IN USE. PROTECT

4. REPLACE CHLORINE ANALYZER 4 PER SPECIFICATION SECTION STRUCTURE. CONTRACTOR TO FIELD VERIFY AREA.

3. AREA IS A DIAGRAMMATIC VIEW OF PAD EAST OF DECHLORINATION AND SPECIFICATION SECTION 13447.

2. VALVE IS 20 +/- FT DEEP. REFER TO SPECIFICATION SECTION 15112

1. EXISTING VALVE ABANDONED IN PLACE.

CONC VAULT

EXISTING PRECAST
JD
74 Digitally signed by Matthew C. Kallevant
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 16:57:00-04'00'

Page 313 of 1800 ends

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 84405
M M
M
M M M
P
lotD
ate: 06-APR
-2023 1:27:41
PM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
85M01
eparker
LA
S
T
SAVED
B
Y:

PROJECT NO. FILE NAME:

EYY
AL

MECHANICAL
8660F10 8660F1085M01.dgn

AWT PUMPS

CLARIFIER FILTER UNITS
MIX
RAPID

BACKWASH PUMPS

AIR WASH BLOWERS

FACILITY

CHLORINATION
FROM
SH SH
SAM
SAM
CLS

RECOVERY BASINS

TO WASHWATER

CONTACT BASINS

TO CHLORINE
C
C
C
C
SH
COAG
POLY
POLY
AA
CC
I
AAFEB
W
W WCC
I
AA
BW
WW
FE
FLR
FLR
FLR
FLR
LEGEND:

SAM
SAM

WW - WASHWATER

SH - SODIUM HYDROXIDE

SAM - SAMPLE

POLY - POLYMER

FLR - FILTER

FE - FINAL EFFLUENT

COAG - COAGULANT

CLS - CHLORINE SOLUTION
CCl - CHLORINE LIQUID

C - CLARIFIER

BW - BACKWASH

AA - AERATION AIR/AIR WASH
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M

AWT PROCESS FLOW SCHEMATIC
M
M
M
M
JD
75 Digitally signed by Matthew C. Kallevant
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 16:57:05-04'00'

Page 314 of 1800 ends

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 84405
P
lotD
ate: 06-APR
-2023 1:26:08
PM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
85M02
LA
S
T
SAVED
B
Y:

PROJECT NO. FILE NAME:

EYY
ELP

MECHANICAL
8660F10 8660F1085M02.dgn
C
85M03
E
85M04
G
85M05
B
85M03
A 3/16"=1'-0"
EX-2" FC
8" AA
EX-24" WW
EX-1" POLY
EX-6" AA
EX-6" AA EX-6" AA
CLARIFIER NO.4 CLARIFIER NO.3 CLARIFIER NO.2 CLARIFIER NO.1 FILTER NO.4 FILTER NO.3 FILTER NO.2 FILTER NO.1
EX-12" FE EX-18" FE EX-14" BW
X KEY TAGS:

EX-24" FE
8660F1085M0101

M M M M

STORAGE TANK

FERRIC CHLORIDE

RAPID MIX DIFFUSER ASSEMBLY
12" BFV (TYP)
14" BFV (TYP)
12" BFV (TYP)
M M
M
M
M
M
M M
13 14 10 5
1 1 16
1 15 12 11

1. FCV-85211 INFLUENT VALVE NO.1

2. FV-85212 AIR VALVE NO.1

3. FV-85217 BACKWASH VALVE NO.1

5. FCV-85221 INFLUENT VALVE NO.2

6. FV-85222 AIR VALVE NO.2

7. FCV-85228 EFFLUENT VALVE NO.2

8. FV-85227 BACKWASH VALVE NO.2

9. FCV-85231 INFLUENT VALVE NO.3

10. FV-85232 AIR VALVE NO.3

12. FCV-85238 EFFLUENT VALVE NO.3

13. FCV-85241 INFLUENT VALVE NO.4

14. FV-85242 AIR VALVE NO.4

16. FCV-85248 EFFLUENT VALVE NO.4

15. FV-85247 BACKWASH VALVE NO.4

17. LCP-85106 AIR WASH BLOWER NO. 1

18. LCP-85107 AIR WASH BLOWER NO. 2

19. LCP-85108 AIR WASH BLOWER NO. 3

20. PMP-85181 COAGULANT FEED PUMP NO. 1

21. PMP-85182 COAGULANT FEED PUMP NO. 2

22. PMP-85183 COAGULANT FEED PUMP NO. 3
9 6
22 21
8 7 4 3
2 2 2 2
3 3 3 3 5

4. FCV-85218 EFFLUENT VALVE NO.1

11. FV-85237 BACKWASH VALVE NO.3

23. #
GENERAL NOTES:

KEY NOTES:
1 6" BFV (TYP) 2 1
8" AA
23 4
8" AA
FCV-25214 WEST GATE VALVE NO.1

FEED PUMPS

EXISTING CAUSTIC
EX-4" SW 6

AWT CLARIFIER/FILTER PLAN
20 8
9 ANODE (TYP)

MAGNESUIM
(TYP OF 4)

WASTE GATE
TANK

CAUSTIC STORAGE
(STP) (STP) (STP) (STP)
(PVC)
EX-12" FE
(STP)
(SST) (SST)
EX-12" FE
(STP)
(SST)
EX-12" FE
(STP)
EX-24" FE
7 1
85M04
19 17
2 1/2" FC
3" FE
(STP)
D
85M04
F
85M05
24 M M M M

24. PMP-85104 RAPID MIX PUMP
18 12 25
8" AA
11 10

TROUGH (TYP)

COLLECTION

25. FE-85105 AIR WASH VENTURI FLOW METER
eparker
11 12. REINSTALL EXISTING VENTURI FLOW METER.

11. PENETRATE WALL AS REQUIRED FOR NEW 8-INCH AIR PIPING.

REMOVED. REFER TO 85D01 AND SPECIFICATION SECTION 01140.

10. BLIND FLANGE TEE ONCE EXISTING 6-INCH PIPING HAS BEEN SECTION 11242.

9. PROVIDE A RAPID MIX PUMP PER SPECIFICATION SPECIFICATION REFER TO PHOTO 4/85D03 FOR THE PUMP THAT WILL BE REPLACED.

8. PROVIDE A COAGULANT PUMP PER SEPCIFICATION SECTION 11242.

REFER TO PHOTO 6/85D03 FOR THE TIE-IN LOCATION.

7. PROVIDE A TEE TO TIE INTO THE EXISTING AERATION AIR LINE.

6. ABANDON LINE IN PLACE. REFER TO 85D01 AND 85D02.

PROCESS.

SPECIFICATION SECTION 09960 DURING THE MEDIA REPLACEMENT

5. CONTRACTOR TO FULLY RECOAT THE CLARIFIER/FILTER TANKS PER PHOTO 6/85D03. OTHER WASTE GATES NOT SHOWN FOR CLARITY.

AWT CLARIFIER/FILTER UNIT WITH A LINEAR ACTUATOR. REFER TO

4. REPLACE EXISTING PNEUMATIC WASTE GATE ACTUATOR ON EACH

3. REPLACE ADSORPTION CLARIFIER MEDIA.

2. REPLACE FILTER MEDIA AND FILTER GRAVEL SUPPORT.

AND ACTUATORS PER SPECIFICATION SECTION 13447.

1. PROVIDE BUTTERFLY VALVE PER SPECIFICATION SECTION 15112 JD
76 AWT CLARIFIER/FILTER UNITS.

5. REFER TO SPECIFICATION SECTION 11802 FOR WORK ON THE FOUR

4. SEE CIVIL DRAWINGS FOR YARD PIPING CONTINUATION.

AND ORIENTATION OF VALVES AND VALVE ACTUATORS.

3. CONTRACTOR SHALL COORDINATE WITH THE CITY THE LOCATION BOLTS, AND GASKETS.

EXISTING PIPING COMPONENTS. DO NOT REUSE THE OLD NUTS,

FOR ALL CONNECTIONS, INCLUDING REINSTALLATION OF ANY

2. CONTRACTOR SHALL PROVIDE NEW NUTS, BOLTS, AND GASKESTS CONTRACTOR TO FIELD VERIFY EXISTING DIMENSIONS.

1. BACKGROUND IS BASED ON THE 1994 RECORD DRAWINGS.

Digitally signed by Matthew C. Kallevant
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 16:57:11-04'00'

Page 315 of 1800 ends

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 84405
P
lotD
ate: 06-APR
-2023 1:26:54
PM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
85M03
eparker
LA
S
T
SAVED
B
Y:

PROJECT NO. FILE NAME:

EYY
ELP

MECHANICAL

PLAN AND SECTIONS
8660F10 8660F1085M03.dgn
B
85M02 1/4"=1'-0"
C
85M02 1/4"=1'-0"

M M M M

M M M M
#
GENERAL NOTES:

KEY NOTES:
8660F1085M0300
8660F1085M0302
EX-24" CCI
EX-6" AA
EX-24" CCI
EX-12" CCI
EX-12" CCI
EX-6" AA EX-6" AA EX-6" AA
EX-20" WW EX-18" CCI
EX-18" CCI
EX-20" WW
EX-20" WW
12" BFV (TYP)
6" BFV (TYP)
EX-12" FE
EX-14" BW
EX-12" FE
EX-14" BW
EX-4" SW
EX-14" BW
EX-18" FE
EX-24" FE
EX-4" SW
EX-14" BW EX-24" FE EX-12" FE EX-14" BW
EX-12" FE
EX-14" BW
EX-12" FE
EX-14" BW
M M
M M
M M

M M M M
1 3
2 4
EX-1" VENT EX-1" VENT EX-1" VENT
EX-1" VENT
8" AA
EX-6" AA
(TYP) 1

1. REFER TO GENERAL NOTES ON 85M02.

1. FV-85219 AC AIR SCOUR VALVE NO. 1

2. FV-85229 AC AIR SCOUR VALVE NO. 2

3. FV-85239 AC AIR SCOUR VALVE NO. 3

4. FV-85249 AC AIR SCOUR VALVE NO. 4
X KEY TAGS:
(SST)
(STP) (STP)
(SST)
(STP)
(SST)
(SST)
(STP)
(STP)
(STP)
(STP)
(STP)
(STP)
(STP) (STP)
(STP)
(STP)
(STP)
(STP)
(STP) (STP) (STP)
(STP)
(SST)
(STP) (STP)
(STP)
(STP)
(STP)

AWT CLARIFIER/FILTER
TYP
2 MP272

STANDPIPE
EXISTING 42"
(TYP)
REFER TO SECTION 09960.

2. RESTORE TANK COATINGS AFTER INSTALLING PIPE SUPPORTS.

BE DETERMINED.

SCOUR LINE AS DIRECTED BY THE MANUFACTURER. LOCATION TO

1. PROVIDE NEW PENETRATION IN EXISTING AWT UNITS FOR NEW AIR JD
77 Digitally signed by Matthew C. Kallevant
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 16:57:16-04'00'

Page 316 of 1800 ends

BLOWER NO.1

AIR WASH
BLOWER NO.3

AIR WASH

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 84405
P
lotD
ate: 06-APR
-2023 1:26:06
PM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
85M04
eparker
LA
S
T
SAVED
B
Y:

PROJECT NO. FILE NAME:

EYY
ELP

MECHANICAL
8660F10 8660F1085M04.dgn
D
85M02 3/8"=1'-0"
E
85M02 3/8"=1'-0"
8" AA
8660F1085M0301 8660F1085M0303
TYP
MP132
1 SECTIONS

AIR WASH BLOWERS
8" AA
4" AA
NO.2
BLOWER

AIR WASH
NO.3
BLOWER

AIR WASH

1. REFER TO GENERAL NOTES ON 85M02.
#

1. PROVIDE OVERHEAD PIPE SUPPORTS FIVE FEET ON CENTER.

GENERAL NOTES:

KEY NOTES:
4" AA 4" AA 4" AA
JD
78 FLOW METER
Digitally signed by Matthew C. Kallevant
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 16:57:21-04'00'

Page 317 of 1800 ends

RAPID MIXER
PUMP NO.1

COAGULANT FEED
PUMP NO.2

COAGULANT FEED
PUMP NO.3

COAGULANT FEED
9"
1'-0"
3'-6"

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 84405
P
lotD
ate: 06-APR
-2023 1:27:12
PM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
85M05
LA
S
T
SAVED
B
Y:

PROJECT NO. FILE NAME:

EYY
ELP

MECHANICAL
8660F10 8660F1085M05.dgn
G
85M02 3/8"=1'-0"
8660F1085M0301
1 RAPID MIX DIFFUSER ASSEMBLY
NTS
8660F1085M0305
85M02

COAGULANT FEED PUMP AND RAPID MIX PUMP
F
85M02 1/4"=1'-0"
8660F1085M0101
TANK

CAUSTIC STORAGE

STORAGE TANK

FERRIC CHLORIDE
EX-2" FC

RAPID MIX DIFFUSER ASSEMBLY
1 85M05
2 1/2" FC
3" FE
G
85M05
EX-1" POLY

FEED PUMPS

EXISTING CAUSTIC
GENERAL NOTES:

RAPID MIX PUMP

PLAN, SECTION, AND DETAIL

1. REFER TO GENERAL NOTES ON 85M02.

CL PIPE
FLOW
(M
IN
)

WALL THICKNESS

CUT AWAY DEPICTS PIPE

DISCHARGE PIPE

FLASH MIX PUMP
3" FE

SIZE, AND MATERIAL

SEE DWGS FOR TYPE,

CHEMICAL SUPPLY LINE,

PIPING MATERIAL LIST
1 2
4 5
3 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
UNION
6" STEEL FLANGE, 150 LB, FLAT FACE, AWWA
LENGTH AS REQD, 2" TITANIUM PIPE

THREADED
1" TITANIUM WELDED OUTLET BRANCH CONNECTION,
1/2" X 1" TITANIUM NIPPLE, THREAD X BUTT

WELD TO INSIDE WALL OF PIPE
1/4" THICK X ID TITANIUM PLUG, FABRICATED AND
6" 316 STN STL, BLIND FLANGE. 150 LB, AWWA
FLANGE
2 1/2" 316 STN STL ALIGNING SOCKET , WELD TO BLIND
3" 316 STN STL, 150 LB FLANGE, FLAT FACE, AWWA
6" 316 STN STL, 150 LB BLIND FLANGE
3" STL, 150 LB FLANGE, FLAT FACE, AWWA
LENGTH AS REQD, 316 STN STL, SCHED 40
SHORT RADIUS ELBOW, 316 STN STL, SCHED 40
INTO SOCKET.

WRAPPED AROUND PIPE/TUBE PRIOR TO INSERTION
1/4" THICK FOOD GRADE, BUNA RUBBER STRIP
1 1/2" SCH 40, 316 STN STL. WELD TO ELBOW

TO BLIND FLANGE
1 1/2" THREADED HALF COUPLING, 316 STN STL, WELD
3" X 2 1/2" REDUCER, 316 STN STL, SCH 40
1 1/2" GROOVED COUPLING, 316 STN STL
3" 316 STN STL BLIND FLANGE, 150 LB, AWWA
6" STL, 150 LB FLANGE, FLAT FACE, AWWA
PIPING MATERIAL LIST NOTES:

2. PROVIDE ISOLATION GASKETS BETWEEN DISSIMILAR METALS.

PIPINHG AND EQUIPMENT.

LISTED OR SHOWN. CONTRACTOR SHALL FURNISH AND INSTALL ALL

REDUCERS, BUSHINGS AND PIPE SUPPORTS OR HANGERS ARE NOT

REQUIRED FITTINGS SUCH AS UNIONS, GASKETS, BOLTS, ELBOWS,

1. THE PIPE MATERIAL LIST FOR THIS DETAIL IS NOT COMPLETE, MANY NOTES:

SYSTEMS CO. MODEL 2.5 H-SS-90.

1. NOZZLE - FULL CONE SPRAY PATTERN. 140 GPM @ 19 PSI, SPRAYING 11 1
2 TYP
M203 (TYP)
NOZZLE
2 1'-0"
12 3
4 9
20 10
DI
316 STN STL
12 17
13 15
18 11
16 19
7 8
14 3
6 5
JD
79 eparker
Digitally signed by Matthew C. Kallevant
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 16:57:27-04'00'

Page 318 of 1800 ends

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 84405
P
lotD
ate: 06-APR
-2023 1:27:00
PM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
87M01
eparker
LA
S
T
SAVED
B
Y:

PROJECT NO. FILE NAME:

EYY
ELP

MECHANICAL
8660F10 8660F1087M01.dgn
B
8660F1087M0301

PLAN AND SECTION
GENERAL NOTES:
# KEY NOTES:

BACKWASH PUMP STATION
B
-
2 A
-
8660F1087M0101
3/8"=1'-0"
1/4"=1'-0"
1 3 1
2 3
EX-3/4" FE
EX-1" FE
EX-1 1/2" FE
EX-1 1/2" FE
EX-14" BW
14" BW
EX-4" BW
14" BW
# KEY TAGS:

1. PMP-87134

2. AE-87130

BACKWASH CHLORINE SAMPLE PUMP
CHLORINE ANALYZER 3
4 5 8" BFV
TYP
(TYP)MP637
M
14" BFV (TYP) 3
4 3. FV-87130 HIGH RATE BACKWASH VALVE

4. FV-87230

5. FV-87330

HIGH RATE CONTROL VALVE

LOW RATE CONTROL VALVE
(TYP.)
14"X8" CONC. RED.

4. TIE INTO EXISTING PIPE.

EQUIPMENT TO THE EXISTING SAMPLE LINES AS REQUIRED.

3. SUPPLY ADDITIONAL PIPING AND FITTINGS TO CONNECT NEW INFORMATION.

AND INSTRUMENTATION (60N01) DRAWINGS FOR ADDITIONAL
EXISTING ENCLOSURE IN PLACE. REFER TO ELECTRICAL (60E01) 17505. THE EXISTING ENCLOSURE IS TO REMAIN IN USE, PROTECT

2. REPLACE CHLORINE ANALYZER 4 PER SPECIFICATION SECTION

1. RELOCATE THE EXISTING BUTTERFLY VALVE AS SHOWN.

FABRICATION.

CONTRACTOR AND APPROVED BY THE ENGINEER PRIOR TO

3. PIPE LAYOUT DRAWINGS SHALL BE PREPARED BY THE

2. SEE CIVIL DRAWINGS FOR YARD PIPING CONTINUATION.

CONTRACTOR TO FIELD VERIFY EXISTING DIMENSIONS.

1. BACKGROUND IS BASED ON THE 2005 RECORD DRAWINGS.

JD
80 Digitally signed by Matthew C. Kallevant
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 16:57:32-04'00'

Page 319 of 1800 ends

4'-0"±

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 84405
P
lotD
ate: 06-APR
-2023 1:26:09
PM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
89M01
eparker
LA
S
T
SAVED
B
Y:

PROJECT NO. FILE NAME:

CA
ELP

MECHANICAL
8660F10 8660F1089M01.dgn
A
#
GENERAL NOTES:

KEY NOTES:

B
3/8" = 1'-0" - 1/2" = 1'-0"
B
-

CAROUSEL PUMP STATION

PLAN AND SECTION
8660F1089M0101
16" SE
EX-36" SE
PMP-89100
EX-12" SE
EX-24" SE
EX-36" SE
EX-16" SE
EX-16" SE
EX-16" SE
EX-48" SE
EX-24" SE
1 1
8660F1089M0301
EX-36" SE
16" SE
# KEY TAGS:

3. CAROUSEL PUMP NO. 3

2. CAROUSEL PUMP NO. 2

1. CAROUSEL PUMP NO. 1
PMP-89101
PMP-89102
1 2
2 3
PUMP NO. 3

CAROUSEL
2 2
16" DMJT
16" SCV
16" BFV
TO PAU
3 TYP
MP034
MATCH LINE STA 10+04.73 ON DWG 91C07
CL 582.50 1

3. SEE CIVIL DRAWINGS FOR YARD PIPING CONTINUATION.

AND ORIENTATION OF VALVES AND VALVE ACTUATORS.

2. CONTRACTOR SHALL COORDINATE WITH THE CITY, THE LOCATION, BOLTS, AND GASKETS.

EXISTING PIPING COMPONENTS. DO NOT REUSE THE OLD NUTS,

FOR ALL CONNECTIONS, INCLUDING REINSTALLATION OF ANY

1. CONTRACTOR SHALL PROVIDE NEW NUTS, BOLTS, AND GASKETS

3. WATER LEVEL PER THE 1994 RECORD DRAWINGS.

2. PROVIDE NEW MOTOR FOR PUMP.

1. FOR PIPING ELEVATION REFER TO DWG 91C07.

JM
81 Digitally signed by Matthew C. Kallevant
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 16:57:37-04'00'

Page 320 of 1800 ends

1'-0"
5'-0"

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 84405
P
lotD
ate: 06-APR
-2023 1:26:56
PM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
91M01
LA
S
T
SAVED
B
Y:

PROJECT NO. FILE NAME:

AL

MECHANICAL

PLAN AND SECTION
8660F10 8660F1091M01.dgn
#
GENERAL NOTES:

KEY NOTES:

A
B
- 3/8" = 1'-0"
3/8" = 1'-0"
8660F1091M0101
8660F1091M0301
CA

PAU PUMP STATION
B
-
TYP
MP370
# KEY TAGS:
1 10" SE
TYP
10" BFV
10" SCV
10" DMJT

SLIDE GATE

OPERATED

MANUALLY
10" RFCA
MP034
TYP
MP032
10" SE
16" SE
PV
C
D
IP

1. PMP-91100 PAU PUMP NO.1

FROM PAU
INV 569.03
M
IN
TYP
(TYP)MP370
CL 584.15
eparker
MATCH LINE STA 10+02 ON DWG 91C08
TOC 565.00
1 3. SEE CIVIL DRAWINGS FOR YARD PIPING CONTINUATION.

AND ORIENTATION OF VALVES AND VALVE ACTUATORS.

2. CONTRACTOR SHALL COORDINATE WITH THE CITY, THE LOCATION, BOLTS, AND GASKETS.

EXISTING PIPING COMPONENTS. DO NOT REUSE THE OLD NUTS,

FOR ALL CONNECTIONS, INCLUDING REINSTALLATION OF ANY

1. CONTRACTOR SHALL PROVIDE NEW NUTS, BOLTS, AND GASKETS TOC 582.00
TOP OF BERM 581.00

RELIEF VALVE
1" AIR
16" SE

1. REFER TO DRAWING 91C08 FOR PIPING ELEVATION.

JM
82 Digitally signed by Matthew C. Kallevant
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 16:57:43-04'00'

Page 321 of 1800 ends

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
P
lotD
ate:3/3/202312:37:22
PM
GENERAL NOTES:

KEY NOTES:

UNLESS NOTED OTHERWISE.

1. ALL GROOVED END COUPLINGS TO BE RIGID
HMI. PROVIDE PROTECTIVE COVER.

3. SIDE MOUNT PRESSURE INDICATOR WITH
BLIND FLANGE ON PUMP CAN.

FOR FUTURE PUMP INSTALLATION. INSTALL

2. INSTALL UPSTREAM PIPING AND PUMP CAN
SUPPLIED.

EQUIPMENT

BY THE CONTRACTOR TO SUIT THE

1. FINAL DIMENSIONS SHALL BE COORDINATED
CA
BB
JM
99M01
83 MECHANICAL

RECYCLED WATER PUMP STATION

PLAN, SECTION AND DETAIL
8660F1099M01.dw
g
eparker 8660F10
(TYP)
FUTURE
C
99M02
B
-
FE-99411
SCALE:

FILE:

A PLAN
99C19 1/4" = 1'-0"
8660F1000M100
SCALE:

FILE:

B SECTION
- 3/8" = 1'-0"
8660F1000M100

VERTICAL PUMP

TURBINE
-
1 12" RW
16" RW
TYP
MP034
(TYP)
TYP
MP032
14" RW
16" RW
CL 592.00
CL 605.83
SCALE:

FILE:
1 DETAIL
- NO SCALE
-

VERTICAL PUMP MOUNTING
3/4" GAVL STEEL PIPE

AIR RELEASE VALVE
3/4" BALVE VALVE
3/4" 3000 LF FS HALF

COUPLING SHOP WELDED

TO SOUTH SIDE OF PUMP

BASE PLATE

PIPE TO SLAB

PUMP BASE PLATE
TYPE 316 SS W/ NUT AND WASHER

LOCKWASHER OR DOUBLE NUTS
(LENGTH AS REQUIRED)

PROJECT MIN TWO THREADS

ABOVE NUT (TYP)

LEVELING PLATE THICKNESS PER

MANUFACTURER
2" NON-SHRINK GROUT

PUMP PAD
TYPE 316 SS ANCHOR BOLT W/
TWO TYPE 316 SS HEX NUTS AND
LOCKWASHERS FOR LEVELING.

EMBEDMENT AND ANCHOR BOLT

SIZE PER PUMP MANUFACTURER

REQUIREMENTS
TYPE 316 SS BAR 4x4x1/2" (MIN)

TACK WELD TO BOLT
TYPE 316 SS NUT

STEEL PUMP CAN

SEAL WELD

MACHINED GROOVE

AND O-RING SEAL

FROM TANK
1 PMP-99411
PMP-99412
PMP-99413
PMP-99414
PMP-99415
12" RW
16" RW

TO DISTRIBUTION SYSTEM
SEE DWG 99C19 FOR

CONTINUATION
16" RW
FSL-99411
FSL-99412
FSL-99413
FSL-99414
3 PIT-99432
PSH-99432
16" RW
4'-6" 11'-0" 4'-6" 6'-6"
10'-0" 10'-0" 10'-0"
5'-1"
10'-0" 8'-5" 5'-6"

VERTICAL

TURBINE

PUMP (TYP)
14" BFV
(TYP)
12" BFV
(TYP)
(TYP)
12" SWING

CHECK (TYP)
16"x12" REDUCING
BEND
16"x14" RED

A / V VALVE
(TYP)
14" FC
16"x12" RED

TEE (TYP)

FLOW SWITCH

RIGID GROOVED

END COUPLING
12" FLEXIBLE

EXPANSION JOINT

VALVE BOX AND

STEM RISER
16" TEE (TYP)
16" RW
16"x12" REDUCING
BEND
12" MAG METER

A / V VALVE
(TYP)
TYP
MP034

RIGID GROOVED

END COUPLING (TYP)
16"x12" RED
12" RW 2
16" BF
16" RW
14" RW
(TYP)
12" BF
#
PI-99411
PI-99412
PI-99413
PI-99414

PRESSURE
GAUGE
Digitally signed by Reace P. Fisher
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 15:09:12-07'00'

Page 322 of 1800 ends

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
P
lotD
ate:3/3/202312:38:51
PM
GENERAL NOTES:

UNLESS NOTED OTHERWISE.

1. ALL GROOVED END COUPLINGS TO BE RIGID
CA
BB
JD
99M02
84 MECHANICAL

RECYCLED WATER PUMP STATION

SECTION
8660F1099M02.dw
g
eparker 8660F10
SCALE:

FILE:

C SECTION
99M01 3/8" = 1'-0"
8660F1000M100
16" RW
(TYP)
TYP
MP034
TO

DISTRIBUTION
SYSTEM
CL 592.00 (TYP)

PUMP CAN (TYP)

CONCRETE ENCASE

PUMP CAN (TYP)

CONC CAN BASE

SUPPORT (TYP)
EL 588.00 (TYP)
14" RW
(TYP)

RIGID GROOVED

END COUPLING (TYP)

VERTICAL TURBINE

PUMP (TYP)
16"x12"

REDUCING
BEND

A / V VALVE
12" MAGNETIC

FLOW METER
16"x12" RED

FUTURE VERTICAL
TURBINE PUMP\
16" RW
Digitally signed by Reace P. Fisher
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 15:09:41-07'00'

Page 323 of 1800 ends

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
P
lotD
ate:3/3/202312:39:59
PM
KEY NOTES:

5. RIGID GROOVED END COUPLING

4. 12"X16" REDUCING BEND

3. A / V VALVE (TYP)
SECTION 15117

2. 12" TANK FILL VALVE PER SPECIFICATION

1. 12" MAGNETIC FLOW METER
#
RPF
BB
JM
99M03
85 MECHANICAL

METER AND CONTROL VALVE

PLAN AND SECTION
8660F1099M03.dw
g
eparker 8660F10
SCALE:

FILE:

E METER & CONTROL VALVE SECTION
- 3/8=1'-0"
8660F10M03
SCALE:

FILE:

D METER & CONTROL VALVE PLAN
99C19 3/8=1'-0"
8660F10M03

TO TANK INLET
SEE DWG 99C19
4 -
E

FROM RW DISTRIBUTION
SYSTEM SEE DWG 99C19

FOR CONTINUATION
16" PW
3'-6"
3 2
1 5
(TYP)
3 4
18" PW
TYP
12" S300
THICK
TYP
(TYP) MP034
5'-0" MIN. 3'-0" MIN.
2 VAL-99402
1 FIT-99406
16" RW
4 3
TYP
MP034 (TYP)
5 (TYP)
4 3
16" RW
VAL-99402
FIT-99406

FROM RW DISTRIBUTION
SYSTEM SEE DWG 99C19

FOR CONTINUATION
CL=603.83
TOC=603.33
CL=595.00+/- CL=590.00

TO TANK INLET
SEE DRAWING 99C19
6'-0"
19'-2"
Digitally signed by Reace P. Fisher
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 15:10:09-07'00'

Page 324 of 1800 ends

3'-4"
3'-4"

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 84405

REFRIGERANT LINES (TYP)
CU-99421 2
FCU-99422 1
3 3
TYP
HE620
18" DRYWELL
CU-99422 2
GENERAL NOTES:

1. MOUNT THERMOSTATS AT 48'' AFF AND LABEL
WITH ITS CONTROLLING DEVICE.

2. REFRIGERANT AND CONDENSATE DRAIN PIPING

SHALL NOT BE ROUTED ABOVE ELECTRICAL
EQUIPMENT. REFRIGERANT PIPING SHALL BE
INSULATED PER SPECIFICATION 15000.

3. PIPE SUPPORTS SHALL BE INSTALLED PER DETAIL
MP132/TYP, MP218/TYP, AND MP215/TYP. INSTALL
WALL PENETRATIONS PER DETAIL MP302/TYP.

KEY NOTES:
1 MINI-SPLIT FAN COIL UNIT SUSPENDED FROM
CEILING. BOTTOM OF UNIT AT 10'-0 AFF.
2 OUTDOOR CONDENSER UNIT. MOUNT UNIT ON
EQUIPMENT PAD PER S300/TYP.
3 1'' SCHEDULE 40 PVC CONDENSATE DRAIN
ROUTED TO 18'' DRYWELL. SLOPE LINES AT A
MINIMUM OF 2% SLOPE.
4 ROUTE REFRIGERANT LINES DOWN INTERIOR SIDE
OF WALL.
#
T
4 T
FCU-99422
TO
FCU-99421
TO
1 FCU-99421
P
lotD
ate:3/3/202312:41:13
PM
TCW
AMT
JM
99M04
86 MECHANICAL

ELECTRICAL BUILDING

HVAC FLOOR PLAN AND SCHEDULE
8660F1099M04.dw
g
eparker 8660F10
F
8660F1000H0101
1/2" = 1'-0"
TYP
S300 (TYP)
Digitally signed by Matthew C. Kallevant
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 16:57:48-04'00'

Page 325 of 1800 ends

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 199

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®

ELECTRICAL PLAN SYMBOLS ELECTRICAL ONE-LINE SYMBOLS

DUPLEX RECEPTACLE

QUADRUPLEX RECEPTACLE
DUPLEX RECEPTACLE w/SPLIT WIRE

WELDING RECEPTACLE

SPECIAL PURPOSE RECEPTACLE

TWIST LOCK RECEPTACLE

TELEPHONE OUTLET

DATA COMMUNICATIONS OUTLET

LUMINAIRE IDENTIFICATION

LUMINAIRE, EMERGENCY/EXIT BATTERY-POWERED

LUMINAIRE, EMERGENCY BATTERY-POWERED REMOTE
(PERTAINS ONLY TO SHEET WHERE NOTE IS FOUND)

LUMINAIRE, EMERGENCY BATTERY-POWERED

LUMINAIRE, SURFACE OR PENDANT MOUNTED

LUMINAIRE, FLOOD/SPOT
LUMINAIRE, EXIT ONE OR TWO FACES AS INDICATED.

ARROW POINTS IN DIRECTION OF EGRESS.

LUMINAIRE, WALL WASHER
2' X 2' LAY-IN TROFFER
2' X 4' LAY-IN TROFFER

LUMINAIRE POLE MOUNTED

PHOTOCELL
MOTOR

EQUIPMENT/INSTRUMENT LOCATOR

EXPOSED CONDUIT

EXPOSED CONDUIT HIDDEN BEHIND WALLS,

FLOORS OR OTHER STRUCTURES

UNDERGROUND CONDUIT, DIRECT BURIED

CONDUIT VERTICAL CHANGE IN DIRECTION

JUNCTION BOX

CONDUIT SEAL

MEDIUM VOLTAGE

DISCONNECT SWITCH

NON-FUSED CUT OUT

MEDIUM VOLTAGE

DISCONNECTING FUSE

SINGLE FUSE CUT OUT

MEDIUM VOLTAGE

DISCONNECTING FUSE

DOUBLE FUSE CUT OUT

MEDIUM VOLTAGE SINGLE FUSE

MEDIUM VOLTAGE DOUBLE FUSE

MEDIUM VOLTAGE
FUSE

LIVE FRONT TERMINATOR

MEDIUM VOLTAGE ELBOW

UTILITY METER

CAPACITOR

BATTERY

LIGHTNING ARRESTER
GROUND

AMPERE TEST POINT

VOLTAGE TEST POINT

GROUNDED WYE CONNECTION

DELTA CONNECTION

GROUND ROD

SOLID STATE

MULTIFUNCTION METER

GROUND ROD AND GROUND WELL

IDENTIFICATION SYMBOLS MEDIUM VOLTAGE LOW VOLTAGE MISCELLANEOUS

GROUNDING

LUMINAIRES

SWITCHES/RECEPTACLES RACEWAY

LUMINAIRE, WALL MOUNTED

CONDUIT IDENTIFICATION
XXXX = CONDUIT NUMBER,

REFER TO CONDUIT SCHEDULE

APPROXIMATE DIMENSIONS

EQUIPMENT ENCLOSURE

MOV-ELBOW ARRESTER

MEDIUM VOLTAGE CONTACTOR

MEDIUM VOLTAGE STARTER

KIRK KEY INTERLOCK
a
b
c

FIRE ALARM CONTROL PANEL

FIRE ALARM PULL STATION

FIRE ALARM HORN/STROBE COMBINATION

FIRE ALARM STROBE

CONDUIT SIZE AND CONDUCTORS
W"C (WHERE INDICATED): W = CONDUIT TRADE SIZE
U = NUMBER OF PARALLEL RUNS

IN FLOOR QUADRUPLEX RECEPTACLE

FIBER OPTIC CABLES
FO/N
N = NUMBER OF INDIVIDUAL FIBERS

INDIVIDUAL CONDUCTORS

IN FLOOR DUPLEX RECEPTACLE

ENGINE-GENERATOR RATINGS AS INDICATED ON

THE DRAWINGS

CURRENT TRANSFORMER WITH

SHORTING TERMINAL BLOCK

DISCONNECT SWITCH

LOW VOLTAGE CIRCUIT BREAKER

AUXILIARY OPERATOR
* = S = SHUNT TRIP
= G = GROUND FAULT INTERRUPTER
= V = SOLENOID KEY RELEASE

CIRCUIT BREAKER, MEDIUM VOLTAGE

ANSI RELAY DEVICE
52 a
b
a
b
b
a
b
c
d
e
a
f
c
d
e
J
FACP
F
F
F
F
b
a
HP
~
G
c
b
a
d
e
a
b
a
b
ATP
SSM
VTP
*
b
B
A

CONDUIT IN SLAB
b
c
a

DRAWOUT CONNECTION
f
g
h

TRANSFORMER
a = DEVICE I.D.
b = KVA RATING
c = NUMBER OF PHASES
d = PRIMARY VOLTAGE
e = SECONDARY VOLTAGE
f,g= CONNECTION TYPE SYMBOL
h = IMPEDANCE

PACKAGED EQUIPMENT

LOAD RATING AS INDICATED
c d

POTENTIAL TRANSFORMER
a = QUANTITY
b = RATIO
c,d = CONNECTION TYPE SYMBOL 3 = QUANTITY
X = SIZE OF CONDUCTORS
(Ø) = DESIGNATES PHASE CONDUCTORS
1 = QUANTITY
Y = SIZE OF CONDUCTORS
(N) = DESIGNATES NEUTRAL CONDUCTORS
1 = QUANTITY
Z = SIZE OF CONDUCTORS
(G) = DESIGNATES GROUND CONDUCTORS
a
b
2 = DOUBLE POLE SWITCH
3 = THREE-WAY SWITCH
4 = FOUR-WAY SWITCH
K = KEY OPERATED SWITCH
F = SWITCH AND FUSESTAT HOLDER
P = SWITCH AND PILOT LIGHT
T = THERMOSTAT
D = DIMMER SWITCH
L = LOW VOLTAGE LIGHT SWITCH
M = MANUAL MOTOR STARTER

SINGLE POLE SWITCH
a
b = DEVICE SWITCHED DESIGNATION
= CIRCUIT DESIGNATION

SWITCH AND SINGLE RECEPTACLE

DISCONNECT SWITCH

SMOKE DETECTOR
= TYPE
= IONIZATION
= PHOTOELECTRIC
= DUCT DETECTOR

FIRE SPRINKLER
F = FLOW SWITCH
T = TAMPER SWITCH

MULTI CONDUCTOR CABLES
K/2/C#16S
K (WHERE INDICATED) = NUMBER OF PAIRS
2/C#16S = TWO CONDUCTOR, 16 GAUGE, TWISTED

SHIELDED PAIR
K/3/C#16S
K (WHERE INDICATED) = NUMBER OF TRIPLETS
3/C#16S = THREE CONDUCTOR, 16 GAUGE, TWISTED

SHIELDED TRIPLETS
N = NUMBER OF CONDUCTORS IN THE CABLE
X = SIZE OF CONDUCTORS

LOW VOLTAGE CIRCUIT BREAKER

COMBINATION STARTER

WITH CONTROL POWER TRANSFORMER

SPD SURGE PROTECTIVE
DEVICE
W"C-(3-X (Ø), 1-Y (N) & 1-Z (G))
EQUIP #

UNDERGROUND GROUND CABLE
3-X (Ø):
1-Y (N)(WHERE INDICATED):
1-Z (G)(WHERE INDICATED):

U{3-X (Ø) & 1-X (G)}
N/CX
b
a
a
b
b
a
b
a
b
a
b
a
b
a
a
b
a
b
a
PE
c
ab
a
B
K

LOAD BANK
da
XXXX

CONDUIT CAP

CONDUIT TEE
ARE LABELED LEFT TO RIGHT OR TOP TO BOTTOM.

X
c
b a

BREAK AND CONTINUATION IN CONDUIT RUN

MEDIUM VOLTAGE TEE

FIRE ALARM

APPLIANCE RECEPTACLE

INDICATES KEYNOTE X
X

EQUIPMENT AND INSTRUMENT IDENTIFICATION
#4/0 SDBC UNLESS OTHERWISE NOTED

UNLESS OTHERWISE NOTED, GROUPED CONDUITS
d
R H
3P= THREE POSITION SWITCH

OCCUPANCY SENSOR
c
b a
X

R G GO/NO-GO PANEL - SOLID

R GO/NO-GO PANEL - STROBE
c = TYPE

REFER TO ABBREVIATIONS LEGEND

OR IN DUCT BANK

DUCT BANK

SHOWN ON DUCT BANK SECTIONS

GO/NO-GO PANEL - STROBE AND HORN
= CIRCUIT DESIGNATION
= DEVICE SWITCHED FROM
= MOUNTING HEIGHT IN FEET TO

BOTTOM OF FIXTURE
FOR ALL OTHER DESIGNATIONS.
= REFERENCE LIGHTING CONTROL COMPONENT SCHEDULE
= CIRCUIT DESIGNATION
= DEVICE SWITCHED DESIGNATION
= MOUNTING HEIGHT IN FEET TO BOTTOM OF SENSOR
X
a
b
c
= CIRCUIT DESIGNATION
b = DEVICE TYPE DESIGNATION
a
= CIRCUIT DESIGNATION
b
a
= DISCONNECT TYPE
a = AMP RATING
= CIRCUIT DESIGNATION
b
a
= MOUNTING HEIGHT
= CIRCUIT DESIGNATION
b
a
= MOUNTING HEIGHT
d
P
I
a
= CIRCUIT BREAKER NUMBER
= FRAME SIZE
= ANSI DEVICE FUNCTION
= QUANTITY
b
a
a
b

TYPE AS NOTED

FUSED DISCONNECT SWITCH
MCP = MOTOR CIRCUIT PROTECTOR
TM = THERMAL MAGNETIC
SS = SOLID STATE

FRAME SIZE UNLESS INDICATED)
(AT = AMP TRIP)
(AC = MCP CONTINUOUS RATING)
a = TYPE
b = FRAME SIZE (MANUFACTURER TO DETERMINE
c = NUMBER OF POLES
d = TRIP SETTING
e = DESIGNATION
f = INTERRUPTING RATING
A = TYPE, REFER TO DISCONNECT SCHEDULE
b = FUSE RATING
B = TYPE, REFER TO DISCONNECT SCHEDULE
a = CIRCUIT BREAKER DISCONNECT,
b = STARTER TYPE
c = NEMA STARTER SIZE
d = OVERLOAD

FULL LOAD AMPS AS NOTED
HP = HORSEPOWER RATING
a = RATED LOAD
b = UNIT(HP, KW, KVA) AS INDICATED
a = QUANTITY
b = RATIO
a = KVA/KW
b = VOLTAGE/CONNECTION
c = PHASE
d = WIRE
e = PF
a
MOTOR STARTER/DRIVES:
b
c
VFD-6
VFD-18 = 18-PULSE VFD
= 6-PULSE VFD
RVSS
RVAT
a/B
= LINE REACTOR
PHF = PASSIVE HARMONIC FILTER
LL
LR = LOAD REACTOR
DV/DT = Dv/dt FILTER
SWF = SINE WAVE FILTER
a = DEVICE TYPE
b
c
= REDUCED VOLTAGE SOLID

STATE STARTER
= REDUCED VOLTAGE AUTO

TRANSFORMER
= DEVICE WITH BYPASS
STARTER. REFER TO

THE SPECIFICATIONS

LINEAR FIXTURE
N = NETWORKED SINGLE OR

MULTIPLE SWITCH LOCATIONS
R = RED LIGHT
G = GREEN LIGHT
H = HORN
= INPUT OPTIONS
= OUTPUT OPTIONS
VFD-RH = REDUCED HARMONIC VFD
P
lotD
ate: 05
-APR
-2023 12:58:17
PM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
LEGEND
LA
S
T
SAVED
B
Y:

PROJECT NO. FILE NAME:

CE
CE

ELECTRICAL
00GE01
8660F10 8660F1000GE01.dgn
87 avates
Digitally signed by Erik M. Bahneman
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 15:17:51-07'00'
200

Page 326 of 1800 ends

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 199

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®

ABBREVIATIONS
NOTES:
94 TRIPPING OR TRIP-FREE RELAY
93 FIELD-CHANGING CONTACTOR
92 VOLTAGE AND POWER DIRECTIONAL RELAY
91 VOLTAGE DIRECTIONAL RELAY
90 REGULATING DEVICE
89 LINE SWITCH
88 AUXILIARY MOTOR OR MOTOR GENERATOR
87 DIFFERENTIAL PROTECTIVE RELAY
86 LOCKOUT RELAY
85 PILOT COMMUNICATIONS, CARRIER OR PILOT-WIRE RELAY
84 OPERATING MECHANISM
83 AUTOMATIC SELECTIVE CONTROL OR TRANSFER RELAY

P PHASE PROTECTION

V VOLTAGE

T TRANSFORMER PROTECTION
(RELAY COIL CONNECTED IN RESIDUAL CT CIRCUIT)

N GROUND FAULT PROTECTION

M MOTOR PROTECTION

L LINE PROTECTION
(RELAY CT IN TOROIDAL OR GROUND SENSOR TYPE)

GS GROUND FAULT PROTECTION
(RELAY CT IN A SYSTEM NEUTRAL CIRCUIT OR GENERATOR PROTECTION)

G GROUND FAULT PROTECTION

B BUS PROTECTION

A ALARM ONLY

ABBREVIATIONS

POWER DEVICE FUNCTION NUMBERS

POWER DEVICE FUNCTION NUMBERS

COMMONLY USED SUFFIX LETTERS APPLIED TO

SYM SYMMETRICAL

SWGR SWITCHGEAR

SWBD SWITCHBOARD

SW SWITCH

STB SHORTING TERMINAL BLOCK

SS SOLID STATE

SPKR SPEAKER

SPST SINGLE POLE SINGLE THROW

SPDT SINGLE POLE DOUBLE THROW

SPD SURGE PROTECTIVE DEVICE

SP SINGLE POLE

SM SURFACE MOUNTED

SLT SEALTIGHT LIQUIDTIGHT FLEXIBLE CONDUIT

SFL SUB FEED LUGS

SDBC SOFT DRAWN BARE COPPER

SC SHORT CIRCUIT

SA SURGE ARRESTER

S SHIELD / SHORT-TIME

RVSS REDUCED VOLTAGE SOLID STATE

RVNR REDUCED VOLTAGE NON-REVERSING

RVAT REDUCED VOLTAGE AUTO TRANSFORMER

RMS ROOT MEAN SQUARED

RF RADIO FREQUENCY

REV REVERSE

RECPT RECEPTACLE

RAC RIGID ALUMINUM CONDUIT

PWR POWER

PVC POLYVINYL CHLORIDE RIGID PLASTIC CONDUIT

PT POTENTIAL TRANSFORMER

PRI PRIMARY
PPX POWER PANEL NO. X

PNL PANEL

PH PHASE

PFR PHASE FAILURE RELAY

PFCC POWER FACTOR CORRECTION CAPACITOR

PF POWER FACTOR

PE PHOTOCELL

PCM PROCESS CONTROL MODULE

PCS PVC COATED GALVANIZED STEEL CONDUIT

PB PUSHBUTTON / PULL BOX

PA PUBLIC ADDRESS
P POLE

OL OVERLOAD RELAY

OH OVERHEAD

O OPEN OR OPENED

NP NAMEPLATE

NO NORMALLY OPEN

NL NIGHT LIGHT

NFC NONMETALLIC FLEXIBLE CONDUIT

NEC NATIONAL ELECTRICAL CODE

NC NORMALLY CLOSED

N NEUTRAL

MW MEGAWATT

MVS MEDIUM VOLTAGE SWITCH

MVA MEGAVOLT-AMPERES

MV MEGAVOLT

MTS MANUAL TRANSFER SWITCH
MTR-X MOTOR NO. X

MTO MANUAL THROW OVER

MSP MOTOR STARTING PANEL
MS-X MOTOR STARTER NO. X

MPR MOTOR PROTECTION RELAY

MOV METAL OXIDE VARISTOR

MOD MOTOR OPERATED DAMPER

MLO MAIN LUGS ONLY

MH MANHOLE / MOUNTING HEIGHT

MCP MOTOR CIRCUIT PROTECTOR
MCC - X MOTOR CONTROL CENTER NO. X

MCA MOTOR CIRCUIT AMPS

MA MILLIAMPERE
M-X MOTOR CONTROLLER NO. X

LVL LEVEL

LV LOW VOLTAGE

LTG LIGHTING
LP - X LIGHTING PANEL NO. X

LP LIGHT POLE

LL LEAD-LAG LOAD REACTOR
LCP- X LOCAL CONTROL PANEL NO. X

LC LIGHTING CONTACT OR

LBL LABEL

LA LIGHTNING ARRESTOR

L-G LINE-GROUND

L-B LINE-BUS

L LONG-TIME

KWH KILOWATT HOUR

KWD KILOWATT DEMAND

KW KILOWATT

KVAR KILOVAR (REACTANCE)

KVA KILOVOLT AMPERE

KV KILOVOLT

KA KILOAMP

K KEY INTERLOCK

J JUNCTION BOX
82 DC LOAD MEASURING RECLOSING RELAY
81 FREQUENCY RELAY
80 FLOW SWITCH
79 AC RECLOSING RELAY
78 PHASE-ANGLE MEASURING RELAY
77 TELEMETERING DEVICE
76 DC OVERCURRENT RELAY
75 POSITION CHANGING MECHANISM
74 ALARM RELAY
73 LOAD-RESISTOR CONTACTOR
72 DC CIRCUIT BREAKER
71 LIQUID LEVEL SWITCH
70 RHEOSTAT
69 PERMISSIVE CONTROL DEVICE
68 BLOCKING OR OUT OF STEP RELAY
67 AC DIRECTIONAL OVERCURRENT RELAY
66 NOTCHING OR JOGGING DEVICE
65 GOVERNOR
64 GROUND DETECTOR RELAY
63 PRESSURE SWITCH
62 TIME-DELAY STOPPING OR OPENING RELAY
61 DENSITY SWITCH OR SENSOR
60 VOLTAGE OR CURRENT BALANCE RELAY
59 OVERVOLTAGE RELAY
58 RECTIFICATION FAILURE RELAY
57 SHORT-CIRCUITING OR GROUNDING DEVICE
56 FIELD APPLICATION RELAY
55 POWER FACTOR RELAY
54 TURNING GEAR ENGAGING DEVICE
53 FIELD EXCITATION RELAY
52 AC CIRCUIT BREAKER
51 AC TIME OVERCURRENT RELAY
50 INSTANTANEOUS OVERCURRENT RELAY
49 MACHINE OR TRANSFORMER THERMAL RELAY
48 INCOMPLETE SEQUENCE RELAY
47 PHASE-BALANCE OR PHASE-SEQUENCE VOLTAGE RELAY
46 REVERSE-PHASE OR BALANCE CURRENT RELAY
45 ABNORMAL ATMOSPHERIC CONDITION MONITOR
44 UNIT SEQUENCE STARTING RELAY
43 MANUAL TRANSFER OR SELECTOR DEVICE
42 RUNNING CIRCUIT BREAKER
41 FIELD CIRCUIT BREAKER
40 FIELD RELAY
39 MECHANICAL CONDITION MONITOR
38 BEARING PROTECTIVE DEVICE
37 UNDERCURRENT OR UNDERPOWER RELAY
36 POLARITY DEVICE
35 BRUSH-OPERATING OR SLIP-RING SHORT-CIRCUITING DEVICE 34 MASTER SEQUENCE DEVICE
33 POSITION SWITCH
32 DIRECTIONAL POWER RELAY
31 SEPARATE EXCITATION DEVICE
30 ANNUNCIATOR RELAY
29 ISOLATING CONTACTOR
28 FLAME DETECTOR
27N GROUND FAULT UNDERVOLTAGE RELAY
27 UNDERVOLTAGE RELAY
26 APPARATUS THERMAL DEVICE
25 SYNCHRONIZING OR SYNCHRONISM-CHECK DEVICE
24 VOLTS PER HERTZ RELAY
23 TEMPERATURE CONTROL DEVICE
22 EQUALIZER CIRCUIT BREAKER
21 DISTANCE RELAY
20 ELECTRICALLY OPERATED VALVE
19 STARTING-TO-RUNNING TRANSITION CONTACTOR
18 ACCELERATING OR DECELERATING DEVICE
17 SHUNTING OR DISCHARGE SWITCH
16 DATA COMMUNICATIONS DEVICE
15 SPEED OR FREQUENCY MATCHING DEVICE
14 UNDER-SPEED DEVICE
13 SYNCHRONOUS-SPEED DEVICE
12 OVER-SPEED DEVICE
11 MULTIFUNCTION DEVICE
10 UNIT SEQUENCE SWITCH
9 REVERSING DEVICE
8 CONTROL POWER DISCONNECTING DEVICE
7 ANODE CIRCUIT BREAKER
6 STARTING CIRCUIT BREAKER
5 STOPPING DEVICE
4 MASTER CONTACTOR
3 CHECKING OR INTERLOCKING RELAY
2 TIME-DELAY STARTING OR CLOSING RELAY
1 MASTER ELEMENT

TCM - TRIP CIRCUIT MONITOR

SER - SEQUENCE OF EVENTS RECORDER

RTU - REMOTE TELEMETRY UNIT/REMOTE TERMINAL UNIT

RIO - REMOTE I/O DEVICE

PQM - POWER QUALITY MONITOR

PMU - PHASOR MEASUREMENT UNIT

PDC - PHASOR DATA CONCENTRATOR

MET - SUBSTATION METERING

LGC - SCHEME LOGIC

HST - HISTORIAN

HMI - HUMAN MACHINE INTERFACE

HIZ - HIGH IMPEDANCE FAULT DETECTOR

ENV - ENVIRONMENTAL DATA

DFR - DIGITAL FAULT RECORDER

DDR - DYNAMIC DISTURBANCE RECORDER

CLK - CLOCK OR TIMING SOURCE

AFD - ARC FLASH DETECTOR

1. REFER TO SPECIFICATIONS AND OTHER DRAWINGS FOR ADDITIONAL ABBREVIATIONS.

INTERCOM INTERCOMMUNICATION

INT INTERLOCK

INST INSTANTANEOUS

IMC INTERMEDIATE METAL CONDUIT

IJB INSTRUMENT JUNCTION BOX

IC INTERRUPTING CAPACITY

I INSTANTANEOUS / INTERMITTENT LOAD

HZ HERTZ

HVAC HEATING/VENTILATION/AIR CONDITIONING

HV HIGH VOLTAGE

HSTAT HUMIDISTAT

HR HOUR

HPS HIGH PRESSURE SODIUM

HP HORSEPOWER

HF HIGH FREQUENCY

H HOT-LEG

GFR GROUND FAULT RELAY

GFI GROUND FAULT INTERRUPTER (BREAKER)

GFCI GROUND FAULT CIRCUIT INTERRUPTER (RECEPTACLE)

GRC GALVANIZED STEEL RIGID CONDUIT

GEN GENERATOR

G GROUND / EQUIPMENT GROUND / GROUND FAULT

FWD FORWARD

FVR FULL VOLTAGE REVERSING

FVNR FULL VOLTAGE NON-REVERSING

FU SW FUSED SWITCH

FU FUSE

FREQ FREQUENCY

FRC FIBERGLASS RIGID CONDUIT

FO FIBER OPTIC

FLX FLEXIBLE CONDUIT

FLA FULL LOAD AMPS

FDR FEEDER

FACP FIRE ALARM CONTROL PANEL

FA FIRE ALARM

F SUB-FED

ETM ELAPSED TIME METER

EP EXPLOSION PROOF

ENT ELECTRICAL NON-METALLIC TUBING

ENG ENGINE

ENCL ENCLOSURE

EMT ELECTRICAL METALLIC TUBING

EM EMERGENCY

E/G EMERGENCY GENERATOR

DS DOOR SWITCH

DPST DOUBLE POLE SINGLE THROW

DPDT DOUBLE POLE DOUBLE THROW

DM DEMAND METER

DISC DISCONNECT SWITCH

DEMO DEMOLITION
DCU - X DISTRIBUTED CONTROL UNIT NO. X

DCS DISTRIBUTED CONTROL SYSTEM

DC DIRECT CURRENT

CW CLOCKWISE / COOL WHITE

CV CONTROL VALVE

CT CURRENT TRANSFORMER

CS CONTROL SWITCH

CR CONTROLLED RECEPTACLE

CPT CONTROL POWER TRANSFORMER

COMM COMMUNICATION

COM COMMON

COAX COAXIAL CABLE

CKT CIRCUIT

CCW COUNTER CLOCKWISE

CCTV CLOSED CIRCUIT TELEVISION

CB CIRCUIT BREAKER

C CONDUIT / CONTINUOUS LOAD

BRF BELOW RAISED FLOOR

BKR BREAKER

BHP BRAKE HORSEPOWER

BFG BELOW FINISHED GRADE

BAT BATTERY
B BELL

AWG AMERICAN WIRE GAGE

AUX AUXILIARY

AUTO XFMR AUTOMATIC TRANSFORMER

ATS AUTOMATIC TRANSFER SWITCH

ATP AMMETER TEST POINT

ATO AUTOMATIC THROW OVER

AT AMP TRIP

ASYM ASYMMETRICAL

AS AMMETER SWITCH

ARM ARMORED CABLE

APU AUXILIARY POWER UNIT

ANT ANTENNA

ANN ANNUNCIATOR

AM AMMETER

AIC AMP INTERRUPTING CAPACITY

AFC AUTOMATIC FREQUENCY CONTROL

AF AMP FRAME

ACTR ACTUATOR

ACK ACKNOWLEDGE

AC ALTERNATING CURRENT

ABS ABSOLUTE
A AMP

XFMR TRANSFORMER

WP WEATHER PROOF

WT WATER TIGHT

W WATT / WEST

VTP VOLTAGE TEST POINT

VT VOLTAGE TRANSFORMER

VS VOLTAGE SWITCH

VR VOLTAGE REGULATOR

VP VAPORPROOF

VM VOLTMETER

VHF VERY HIGH FREQUENCY

VFD VARIABLE FREQUENCY DRIVE

VCP VENDOR CONTROL PANEL

VAR VARMETER

VA VOLT AMPERE
V VOLT

UVR UNDER VOLTAGE RELAY

UPS UNINTERRUPTIBLE POWER SUPPLY

UNG UNGROUNDED

UHF ULTRA HIGH FREQUENCY

TSTAT THERMOSTAT
TS2W TWO SPEED SEPARATE WINDING
TS1W TWO SPEED CONSEQUENT POLE, ONE WINDING

TS TEMPERATURE SWITCH

TP TWISTED PAIR

TM THERMAL MAGNETIC

TJB TERMINAL JUNCTION BOX

TERM TERMINAL

TENV TOTALLY ENCLOSED NON-VENTILATED

TEFC TOTALLY ENCLOSED FAN COOLED

TE TOTALLY ENCLOSED

TD TEMPERATURE DETECTOR RELAY

TC THERMOCOUPLE / TIME CLOCK / TRAY CABLE

TB - X TERMINAL BLOCK - UNIT X

TACH TACHOMETER
P
lotD
ate: 05
-APR
-2023 12:58:48
PM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1 LA
S
T
SAVED
B
Y:

PROJECT NO. FILE NAME:

CE
CE

ELECTRICAL
00GE02

ABBREVIATIONS
8660F10 8660F1000GE02.dgn
bshepard
88 Digitally signed by Erik M. Bahneman
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 15:19:47-07'00'
200

Page 327 of 1800 ends

HH-1
HH-2

BUILDING

ELECTRICAL

PUMP STATION

RECYCLED WATER
HH-4
HH-3

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 199

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
SS
W
SS
P
lotD
ate: 05
-APR
-2023 1:13:05
PM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
01E01
LA
S
T
SAVED
B
Y:

PROJECT NO. FILE NAME:

HQR
CLH

ELECTRICAL
8660F10 8660F1001E01.dgn
0 20' 40' 80'
A
02E01
A
02E01
A
02E01
A
99E01
C
99E03
B
99E02
D
99E04
JGB
G
99E14
F
99E13
E
99E12
TYP
EM001
TYP
EM001
1 # KEY NOTES:

STORAGE TANK

RECYCLED WATER

WTP PUMP STATION AND STORAGE SITE PLAN
avates

TREATMENT BLDG

EXISTING WATER
TYP
EM002
2 CROSSING UNDER THE DUCT BANK.

REDUCED DEPTH DUCT BANK TO ACCOMMODATE YARD PIPE

2. DUCT BANK SEGMENT BETWEEN HH-2 AND HH-3 SHALL BE BUILT AS FINISHED GRADE.

DUCT BANK AT THIS LOCATION SHALL NOT EXCEED 3'-6" BELOW

1. DUCT BANK CROSSES OVER YARD PIPE. DEPTH FOR BOTTOM OF B
02E01
89 Digitally signed by Erik M. Bahneman
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 15:37:40-07'00'
200

Page 328 of 1800 ends

MV (E)
MV (E)
LV (E)
MV (E)

STRUCTURE

DE-CHLORINATION

FACILITY

CHLORINATION

FACILITY

DE-WATERING
SLUDGE

PUMP STATION

PROPOSED PAU
HH-20
HH-21

BUILDING

POWER GENERATION

STATION
PUMP

CAROUSEL
MV (N)
COUED-4

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 199

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
. 5710
572
572
572
572
574
574
574
574
SD
576
576
576
576
576
SD
WV
WV
WV
WV
578
578
578
578
WV
WV
WV
WV
WV
SS
WV
SS
WV
WV
SS
SS
SS
WV
WV
SS
P
lotD
ate: 05
-APR
-2023 1:11:36
PM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
01E02
LA
S
T
SAVED
B
Y:

PROJECT NO. FILE NAME:

HQR
ASH

ELECTRICAL
8660F10 8660F1001E02.dgn
A
12E01
A
80E01
85E01
A
70E01
A
A
91E01
A
87E01
89E02
B
60E01
A
0 10' 20' 30' 60'
B
91E01

WWTP AND STORAGE POND
BLDG.

EQUIP.

DAFT

FACILITY
AWT
I
02E01
J
02E02
K
02E02
H
02E01
89E01
A
M
02E03
M
02E03 M
02E03
L
02E02
P
02E03
1 2
1 JGB
01E03
01E03
Z
01E03
2 PED-983
3 Z
01E03
2 avates
R
02E03
FIT-88101
FIT-88102
4 4
L-88-101
S-88-101
L-88-102
S-88-102
5 Q
02E03
#
GENERAL NOTES:

KEY NOTES:

DETAIL EM015/TYP.

5. INSTALL CONDUITS UNDERGROUND ACCORDING TO TYPICAL
TYPICAL DETAIL EM104/TYP.

4. INSTALL CONDUITS ADJACENT TO HAND RAILS ACCORDING TO EXACT VAULT LOCATION WITH COUED.
16210 FOR UTILITY CONSTRUCTION DETAILS. COORDINATE THE
CONSTRUCTION DETAIL. REFER TO SPECIFICATION SETCTION

UKIAH ELECTRIC DEPARTMENT (COUED) MV VAULT

3. CONTRACTOR TO PROVIDE MV VAULT ACCORDING TO CITY OF
WITH CITY OF UKIAH ELECTRIC DEPARTMENT (COUED).

COORDINATE EXACT UNDERGROUND 12KV CONDUIT ROUTING
APPROXIMATE. CONTRACTOR SHALL MEET ON SITE AND
TRENCH SECTION. NEW 12KV ROUTING PROVIDED HERE IS

2. INSTALL UNDERGROUND 12KV CONDUITS ACCORDING TO
STRUCTURES OR UNDERGROUND EQUIPEMENT.

NEEDED TO ACCOMMODATE CONSTRUCTION OF NEW
DEMOLISH EXISTING UNDERGROUND 12KV CONDUITS WHERE
TRF-3E AND PEDESTAL PD-983 ARE REMOVED BY COUED,

1. AFTER EXISTING 12KV CONDUCTORS BETWEEN TRANSFORMER
SHALL VERIFY BEFORE EXCAVATION FOR NEW INSTALLATION.

MAY NOT REFLECT ACTUAL FIELD CONDITION. CONTRACTOR

1. EXISTING UNDERGROUND DUCT BANK AND CONDUIT ROUTING
PARTIAL SITE PLAN 90
Digitally signed by Erik M. Bahneman
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 15:20:11-07'00'
200

Page 329 of 1800 ends

HH-13
MH-12
HH-11
HH-10

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 199

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
P
lotD
ate: 05
-APR
-2023 1:12:41
PM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
01E03
LA
S
T
SAVED
B
Y:

PROJECT NO. FILE NAME:

HQR
ASH

ELECTRICAL
8660F10 8660F1001E03.dgn
02E02
02E01
H2
02E01
H1
02E02
I1
02E02
I2
02E02
J2
02E02
K1
02E02
J2
02E02
K2
02E02
J1
02E02
K
02E02
J
02E01
H
02E01
I
1 JGB
1 01E02 1/4" = 1'-0"
8660F1001E0101
2 01E02 1/4" = 1'-0"
8660F1001E0101
J1
J 02E02
DWG 01E02

CONTINUED ON
D
W
G 01
E02
CON
TINU
ED ON
D
W
G 01
E02
CON
TINU
ED ON
DWG 01E02

CONTINUED ON
D
W
G 01
E02
CON
TINU
ED ON
# KEY NOTES:
avates

WWTP AND STORAGE POND SITE

PLAN DETAILS AND TRENCH SECTION
3 4
5 2
Z
01E02 NO SCALE
8660F1003E001
6 UNDERGROUND UTILITIES SHALL BE MINIMUM 12".

6. MINIMUM CLEARANCE BETWEEN 12KV CONDUITS AND OTHER
DRIVEWAY.

5. 2" CONCRETE COVER AT 12" BFG WHERE TRENCH IS UNDER

4. 4" CONDUIT FOR COUED 12KV LINE.

3. 4" CONDUIT FOR COUED 12KV SPARE.

FILL. PROVIDED SECTION IS SCHEMATIC ONLY.

SPCIFICATION SECTION 16210 FOR TRENCH DEPTH, SPACING AND

2. REFER TO UTILITY CONSTRUCTION DETAILS PROVIDED IN
DUCT BANK DRAINAGE.

1. SLOPE DUCT BANKS TOWARD THIS MANHOLE TO PROVIDE PROPER 91 Digitally signed by Erik M. Bahneman
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 15:23:26-07'00'
200

Page 330 of 1800 ends

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 199

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
GENERAL NOTES:

EM001/TYP UNLESS OTHERWISE INDICATED.

1. CONSTRUCT DUCT BANK IN ACCORDANCE WITH DETAIL
X-2054
(2")
X-2100
(2")
X-2101
(2")
X-3100
(2")
X-3104
(2")
X-3200
(2")
X-2021
(2")
X-2031
(2")
X-2041
(2")
X-2051
(2")
X-2052
(2")
X-2053
(2")
S-3102
(2")
N-3100
(2")
X-1500
(2")
X-1501
(2")
X-1502
(2")
X-2011
(2")
C-2015
(2")
S-2011
(2")
S-2021
(2")
S-2031
(2")
S-2041
(2")
S-2431
(2")
X-3100
(2")
X-3104
(2")
X-3200
(2")
C-3102
(2")
X-3101
(2")
S-3101
(2")
L-3102
(2")
L-3200
(2")
C-3105
(2")
C-2025
(2")
C-2035
(2")
C-2045
(2")
N-3100
(2")
X-1500
(2")
X-1501
(2")
X-1502
(2")
X-0010
(4")
X-0011
(4")
P-0010
(4")
P-0011
(4")
X-0010
(4")
X-0011
(4")
P-0010
(4")
P-0011
(4") P-2012
(2")
P-2022
(2")
P-2032
(2")
P-2042
(2")
L-2100
(2")
L-2431
(2")
L-3102
(2")
L-3200
(2")
C-3105
(2")
S-3102
(2")
Width: 3'-0"
Height: 1'-7"
Width: 3'-0"
Height: 2'-4"
Width: 3'-1"
Height: 3'-3"
Width: 2'-4"
Height: 2'-2"

A DUCT BANK SECTION B DUCT BANK SECTION C DUCT BANK SECTION D DUCT BANK SECTION 01E01, 01E01, 01E01, 99E01, 99E02, 99E12 01E01 99E02, 99E03, 99E12, 99E13 99E03, 99E13, 99E14 X-3102
(2")
X-3103
(2")
X-3100
(2")
C-3005
(2")
S-3200
(2")
N-3100
(2")
S-3200
(2")
X-3102
(2")
X-3103
(2")
X-91-100
(2")
X-91-102
(2")
C-91-110
(2")
X-91-100
(2")
L-3100
(2")
L-3101
(2")
L-3200
(2")
L-3101
(2")
L-3200
(2")
C-3005
(2")
P-91-101
(2")
L-91-100
(2")
C-91-110
(2")
P-91-101
(2")
L-91-100
(2")
X-91-102
(2")
Width: 1'-11"
Height: 2'-2"
Width: 1'-11"
Height: 1'-9"
Width: 1'-11"
Height: 1'-9"
Width: 1'-7"
Height: 1'-9"
Width: 1'-2"
Height: 1'-5"
E DUCT BANK SECTION F DUCT BANK SECTION H DUCT BANK SECTION H1 DUCT BANK SECTION H2 DUCT BANK SECTION 99E14 99E14 01E02, 01E03, 91E01, 91E01 01E03 01E03
P
lotD
ate: 05
-APR
-2023 1:40:56
PM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
02E01
LA
S
T
SAVED
B
Y:

PROJECT NO. FILE NAME:

HQR
PLK
JGB

ELECTRICAL
8660F10 8660F1002E01.dgn
DUCT BANK SECTIONS 1
bshepard
92 Digitally signed by Erik M. Bahneman
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 15:37:25-07'00'
200

Page 331 of 1800 ends

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 199

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
GENERAL NOTES:

EM001/TYP UNLESS OTHERWISE INDICATED.

1. CONSTRUCT DUCT BANK IN ACCORDANCE WITH DETAIL
X-89-100
(2")
X-89-101
(2")
X-89-120
(2")
X-89-125
(2")
X-89-100
(2")
X-89-120
(2")
X-89-110
(2")
X-89-112
(2")
S-89-102
(2")
N-60-112
(2")
L-89-111
(2")
C-89-120
(2")
S-89-101
(2")
N-60-111
(2")
P-89-131
(2")
L-89-111
(2")
C-89-120
(2")
X-89-101
(2")
X-89-125
(2")
P-91-101
(2")
L-89-112
(2")
C-89-120
(2")
C-91-111
(2")
P-89-101
(2")
P-89-111
(2")
P-89-121
(2")
P-89-131
(2")
P-89-101
(2")
P-89-111
(2")
P-89-121
(2")
S-89-101
(2")
N-60-111
(2")
P-89-101
(2")
P-89-111
(2")
P-89-121
(2")
P-89-132
(2")
Width: 2'-4"
Height: 2'-2"
Width: 1'-11"
Height: 2'-2"
Width: 1'-7"
Height: 1'-9"
Width: 2'-4"
Height: 2'-2"
I DUCT BANK SECTION I1 DUCT BANK SECTION I2 DUCT BANK SECTION J DUCT BANK SECTION NO MATCHING REF DWGS FOUND 01E03 01E03 01E02, 01E03, 01E03 X-89-110
(2")
X-89-112
(2")
X-89-111
(2")
X-89-113
(2")
S-89-102
(2")
N-60-113
(2")
X-89-111
(2")
X-89-113
(2")
P-91-101
(2")
L-89-112
(2")
C-89-120
(2")
C-91-111
(2")
P-91-101
(2")
L-89-113
(2")
C-89-120
(2")
C-91-111
(2")
P-91-101
(2")
L-89-113
(2")
C-89-120
(2")
C-91-111
(2")
P-89-101
(2")
P-89-111
(2")
P-89-121
(2")
P-89-132
(2")
S-89-102
(2")
N-60-112
(2")
P-89-101
(2")
P-89-111
(2")
P-89-121
(2")
P-89-133
(2")
P-89-101
(2")
P-89-111
(2")
P-89-121
(2")
P-89-133
(2")
S-89-102
(2")
N-60-113
(2")
Width: 2'-4"
Height: 2'-2"
Width: 1'-7"
Height: 1'-5"
Width: 2'-4"
Height: 2'-2"
Width: 2'-4"
Height: 2'-2"
Width: 1'-7"
Height: 1'-5"
J1 DUCT BANK SECTION J2 DUCT BANK SECTION K DUCT BANK SECTION K1 DUCT BANK SECTION K2 DUCT BANK SECTION 01E03, 01E03 01E03, 01E03 01E02, 01E03, 70E01 01E03 01E03 P
lotD
ate: 05
-APR
-2023 1:41:03
PM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1 LA
S
T
SAVED
B
Y:

PROJECT NO. FILE NAME:

AH
NS

ELECTRICAL
DUCT BANK SECTIONS 2
8660F10 8660F1002E02.dgn
02E02
JGB
bshepard
93 Digitally signed by Erik M. Bahneman
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 15:20:28-07'00'
200

Page 332 of 1800 ends

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 199

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
GENERAL NOTES:

EM001/TYP UNLESS OTHERWISE INDICATED.

1. CONSTRUCT DUCT BANK IN ACCORDANCE WITH DETAIL
N-60-110
(2")
X-60-100
(2")
P-60-120
(2")
L-60-111
(2")
X-60-105
(2")
S-80-101
(2")
X-80-100
(2")
X-80-101
(2")
P-87-101
(2")
C-87-101
(2")
S-87-100
(2")
P-87-112
(2")
C-87-110
(2")
S-88-105
(2")
Width: 1'-11"
Height: 1'-9"
Width: 1'-11"
Height: 1'-5"
Width: 1'-11"
Height: 1'-5"
Width: 1'-11"
Height: 1'-5"

L DUCT BANK SECTION M DUCT BANK SECTION P DUCT BANK SECTION Q DUCT BANK SECTION NO MATCHING REF DWGS FOUND 01E02, 01E02, 01E02, 70E01, 80E01 01E02, 87E01 01E02, 87E01 C-87-110
(2")
S-87-100
(2")
S-88-105
(2")
P-87-101
(2")
P-87-112
(2")
C-87-101
(2")
Width: 1'-11"
Height: 1'-9"

R DUCT BANK SECTION
01E02, 85E03
P
lotD
ate: 05
-APR
-2023 1:41:08
PM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1 LA
S
T
SAVED
B
Y:

PROJECT NO. FILE NAME:

AH
NS

ELECTRICAL
DUCT BANK SECTIONS 3
8660F10 8660F1002E03.dgn
02E03
JGB
bshepard
94 Digitally signed by Erik M. Bahneman
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 15:20:43-07'00'
200

Page 333 of 1800 ends

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 199

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
~
G
TM
2000 AT
3P
SSM
SPD
3 PHASE
750 KVA
SPARE
TM
1200 AT
3P
1200 AF
65 KAIC
TM
3P
30 AT 65 KAIC
TM
1200 AT
3P
1200 AF
65 KAIC
SPARE
TM
3P
65 KAIC
TM
400 AT
3P
65 KAIC
TM
200 AT
3P
65 KAIC
TM
225 AT
3P
65 KAIC
VFD

12000 V
480/277 V
65 KAIC
2000 AF
3 PHASE
4 WIRE
PR 0.8
480/277 V
655 KW

UTILITY

TO EXISTING
1200 AMPS
480 V, 3 PHASE, 3 WIRE
30 AT
ATS-E
MCC-N
MCC-E

VFD-XFR

MCC-XFR
1 MCC-RW
1 1
2 SWBD-A
XFMR-A
GEN-A
2000 AMPS, 480/277 V, 3 PHASE, 4 WIRE, 60 HZ, 65 KASC RMS 1200 AMPS, 480 V, 3 PHASE, 3 WIRE, 60 HZ, 65 KASC RMS 600 AMPS, 480 V, 3 PHASE, 3 WIRE, 60 HZ, 42 KASC RMS 600 AMPS, 480 V, 3 PHASE, 3 WIRE, 60 HZ, 65 KASC RMS TM
200 AT
3P
42 KAIC
TM
500 AT
3P
65 KAIC
600 AF
500 AT
3P
65 KAIC
600 AF SS-LSIG
600 AMPS, 480 V, 3 PHASE, 3 WIRE, 60 HZ, 65 KASC RMS

SWBD-RWPS

PNL-RWPS
480 V, 3 PHASE, 3 WIRE
600 AMPS
65 KASC RMS
3 1200 AMPS, 480 V, 3 PHASE, 3 WIRE, 60 HZ, 65 KASC RMS 4 4
SHALL FIELD VERIFY WHERE NEEDED.

AND MAY NOT REFLECT EXACT FIELD CONDITION. CONTRACTOR

1. EXISTING EQUIPMENT INFORMATION ARE FROM RECORD DRAWINGS #

4. EXISTING BREAKERS ARE 100% RATED BREAKER.

3. EXISTING SWITCHBOARD IS WESTINGHOUSE, SERIES POW-R-LINE.

TERMINATE NEW PANEL FEEDER CABLES ON NEW LUGS.

2. INSTALL NEW LUGS ON EXISTING MCC HORIZONTAL BUS AND
NUMBER IS 4713A99H12.

1. EXISTING MCC IS WESTINGHOUSE, SERIES 2100. MCC SERIAL GENERAL NOTES:

KEY NOTES:

P
lotD
ate: 05
-APR
-2023
3:31:28
PM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
03E01
LA
S
T
SAVED
B
Y:

PROJECT NO. FILE NAME:

HQR
CLH

ELECTRICAL
8660F10 8660F1003E01.dgn
JGB

WTP MODIFIED OVERALL ONE-LINE DIAGRAM
95 avates
Digitally signed by Erik M. Bahneman
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 15:37:01-07'00'
200

Page 334 of 1800 ends

30" 25" 25"
90"

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON
ORIGINAL DRAWING 0 1"
APRIL 2023 OF 199

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
123456789 10 11 12 13
ABCDEF
123456789 10 11 12 13

ABCDEFG
G
®

FRONT VIEW SIDE VIEW
FILE:

SCALE:

FILE:

SCALE: 1
2A2B2CVFD-99412 2DRECYCLED
WATER PUMP #2
VFD-99413

RECYCLED
WATER PUMP #3
VFD-99414

RECYCLED
WATER PUMP #4

XFMR-RWPS-L

RWPS LIGHTING

TRANSFORMER
SPACE
SPACE
SPD
MAIN

BREAKER

INCOMING
LINE
2E1A1B1C1D1ESPACE

SPACE SPACE
SPACE
1F1G1H1I1J1KVFD-99415

RECYCLED
WATER PUMP #5
(FUTURE)
2 ABCDE

JIHGFEDCBAK
WATER PUMP #1

RECYCLED
VFD-99411
3/4" = 1'-0"
8660F1003E0611
3/4" = 1'-0"
8660F1003E0611
PQM-99400

METERING
POWER
PlotDate: 05-APR-2023 3:30:09PM User:svcPW Model:Layout1 ColorTable:gshade.ctb DesignScript:Carollo_Std_Pen_v0905.pen PlotScale:1:1 03E02
LASTSAVED BY:

PROJECT NO. FILE NAME:

HQR
CLH

ELECTRICAL
8660F10 8660F1003E02.dgn

SWBD-RWPS ELEVATION
JGB
96 avates
Digitally signed by Erik M. Bahneman
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 15:25:38-07'00'
200

Page 335 of 1800 ends

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 199

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
600:5
3 500 AT
3P 3P
TM
3 PHASE
30 KVA

SPD
LR
75 3P
TM
65 KAIC
3 -#1/0
(Ø
)
& 1-#6
(G
)
600 AF
65 KAIC

SS-LSIG

RECYCLED WATER
PUMP #1
VFD-RH
150 AT
150 AF
LR
75 3P
TM
65 KAIC
3 -#1/0
(Ø
)
& 1-#6
(G
)

RECYCLED WATER
PUMP #2
VFD-RH
150 AT
150 AF
LR
75 3P
TM
65 KAIC
3 -#1/0
(Ø
)
& 1-#6
(G
)

RECYCLED WATER
PUMP #3
VFD-RH
150 AT
150 AF
LR
75 3P
TM
65 KAIC
3 -#1/0
(Ø
)
& 1-#6
(G
)

RECYCLED WATER
PUMP #4
VFD-RH
150 AT
150 AF
90 AT
480 V
208/120 V
65 KAIC
3 -#3
(Ø
)
& 1-#8
(G
)
3 -#3
(Ø
), 1-#3
(N
)
& 1-#8
(G
)
RECYCLED WATER P.S.

LIGHTNING PANELBOARD
VFD-99411
PMP-99411
VFD-99412 VFD-99413 VFD-99414
PMP-99412 PMP-99413 PMP-99414 PNL-RWPS-L

XFMR-RWPS-L

MAIN BREAKER

FROM PNL-RWPS
LR
75 3P
TM
150 AT

RECYCLED WATER
PUMP #5
(FUTURE)
VFD-99415
PMP-99415
VFD-RH
150 AF
65 KAIC
SWBD-RWPS, 600 AMPS, 480 V, 3 PHASE, 3 WIRE, 60 HZ, 65KASC RMS 2{3
-500KC
M
IL
(Ø
)
& 1-#2/0
(G
)}
SSM
P
lotD
ate: 05
-APR
-2023
3:28:25
PM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
03E03
LA
S
T
SAVED
B
Y:

PROJECT NO. FILE NAME:

HQR
CLH

ELECTRICAL
8660F10 8660F1003E03.dgn

SWBD-RWPS ONE-LINE DIAGRAM
JGB
avates
1 06N01
1 06N01
1 06N01
1 06N01
1 06N01
97 Digitally signed by Erik M. Bahneman
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 15:40:39-07'00'
200

Page 336 of 1800 ends

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 199

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®

PED-325
TFR-3E
PED-983
TFR-2E TFR-1E
PED-326

(CITY OF UKIAH)
UTILITY 12KV
TFR-1
SWR12101
~
G
~
G
1 1
1 STANDBY GENERATOR
GEN12151 GEN12151
(FUTURE)
STANDBY GENERATOR 2
1 2 1
SWB22281 SWB22282
SWB31281 SWB31282
SWB40481
SWB70281
SWB40482
SWB70282
SWB50481 SWB50482
MCC12191 MCC12192
MCC-C
MCC-A
MCC-D

SPACE SPACE

PUMPING SUBSTATION

TRICKLING FILTER

SUBSTATION

HEADWORKS

SUBSTATION

AERATION BLOWER

SUBSTATION
DAFT

SUBSTATION

CLARIFIERS

SECONDARY

SUBSTATION

GENERATION
POWER

SPARE SPARE
52-A5 52-A4 52-A3 52-A2

52-A1
52-AT
52-B1 52-B2 52-B3 52-B4 52-B5 52-B6 52-B7
52-M 52-G1 52-G2
TFR-1E
PHASE 1-3 PUMP STATION CAROUSEL PUMP STATION MAINTENANCE BUILDING ANIMAL SHELTER 3 BUILDING

MECHANICAL

FACILITY
AWT

FACILITY

DEWATERING
SLUDGE
SHALL FIELD VERIFY WHERE NEEDED.

AND MAY NOT REFLECT EXACT FIELD CONDITION. CONTRACTOR

2. EXISTING EQUIPMENT INFORMATION ARE FROM RECORD DRAWINGS DEPARTMENT (COUED).

1. ELECTRIC UTILITY COMPANY IS CITY OF UKIAH ELECTRIC
#
COMPLETED BY THE CONTRACTOR.

AFTER INSTALLATION OF NEW UNDERGROUND 12KV CONDUITS IS
12KV CONDUCTORS INSIDE NEW UNDERGROUND 12KV CONDUITS

3. CITY OF UKIAH ELECTRIC DEPARTMENT (COUED) TO INSTALL NEW AND EXISTING 12KV LINE ROUTING.

SITE PLAN DRAWING 01E02 FOR TRF-3E AND PD-983 LOCATIONS, DURATION AND ACCESS FOR THIS SCOPE WITH COUED. REFER TO PEDESTAL PD-983. CONTRACTOR SHALL COORDINATE THE TIMING, EXISTING 12KV CONDUCTORS BETWEEN TRANSFORMER TRF-3E AND

2. CITY OF UKIAH ELECTRIC DEPARTMENT (COUED) TO REMOVE
(COUED).

IS OWNED AND OPERATED BY CITY OF UKIAH ELECTRIC UTILITY

1. EXISTING 12KV UTILITY LINE FOR WASTEWATER TREATMENT PLANT GENERAL NOTES:

KEY NOTES:

P
lotD
ate: 05
-APR
-2023
3:27:02
PM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
03E04
LA
S
T
SAVED
B
Y:

PROJECT NO. FILE NAME:

HQR
BLS

ELECTRICAL
8660F10 8660F1003E04.dgn
JGB

ONE-LINE DIAGRAM

WWTP MODIFIED OVERALL
98 avates
Digitally signed by Erik M. Bahneman
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 15:40:23-07'00'
200

Page 337 of 1800 ends

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 199

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
#
GENERAL NOTES:

KEY NOTES:
3P
TM
40 LL
LR
VFD-6
3P
MCP
FVNR
40 3P
MCP
FVNR
40 TM
3P
200 AMPS, 480/277 V, 3 PHASE, 4 WIRE, 60 HZ, 65 KASC RMS

EFFLUENT
PUMP NO. 3
3 EFFLUENT
PUMP NO. 2

EFFLUENT
PUMP NO. 1
3 20 AT
? ?
EDR-99101 EDR-99102
TM
2P
20 AT
1 PHASE
1 KVA
480V
120/240V
FIT-99105
VALVE NO. 1

CONTROL
FLOW
VALVE NO. 2

CONTROL
FLOW
METER

VAULT FLOW

METERING
3 PHASE
12KV
480/277V
150 KVA
1 2
1 TRF-3E
(ADMIN BUILDING)
TO PEDESTAL 983
(RECYCLE PUMP STATION)
T2076

TO TRANSFORMER
NO
A
NO
B
3 POLE
200 A

MAIN DISCONNECT SWITCH

MOTOR CONTROL CABINET
5 3 4

TRANSFORMER
6 7
FOR ADDITIONAL DEMOLITION REQUIREMENTS.

REMAIN IN PLACE. REFER TO DRAWING 00D01 GENERAL NOTES

UNDERGROUND AND CONCRETE EMBEDDED CONDUITS SHALL
WHICH ARE MARKED ON THIS DRAWING FOR DEMOLITION.

2. DEMOLISH EXPOSED CONDUIT, AND ALL CABLES FOR CIRCUITS (COUED).

1. ELECTRIC UTILITY IS CITY OF UKIAH ELECTRIC DEPARTMENT

8. SEE DRAWING 03E04 FOR DEMO NOTES.

RECONNECTED TO PNL70271.

7. EXISTING FLOW METER DISCONNECT SWITCH TO BE
MCC70293.

6. EXISTING DISCONNECT SWITCH TO BE RECONNECTED TO
MCC70292, AND REDESIGNED AS A CAROUSEL PUMP.

5. EXISTING PUMP WITH NEW MOTOR TO BE RECONNECTED TO
MCC70291, AND REDESIGNATED AS A CAROUSEL PUMP.

4. EXISTING PUMP WITH NEW MOTOR TO BE RECONNECTED TO
MOTOR REQUIREMENTS.

PUMP. PROTECT PUMP IN PLACE. REFER TO SPEC 11312D FOR

3. REMOVE EXISTING PUMP MOTOR FROM EXISTING EFFLUENT
01140.

PROCEDURE SHOULD COMPLY WITH SPECIFICATION SECTION
POSITION. IF POWER SHUT DOWN IS REQUIRED, THE
(COUED), AND PLACE BOTH A AND B SWITCHES IN OPEN

PLANT OPERATOR AND CITY OF UKIAH ELECTRIC DEPARTMENT
IN PLACE. DEMOLISH SECONDARY CONDUCTORS. VERIFY WITH

2. PROTECT CAROUSEL PUMP STATION EXISTING TRANSFORMER
DEPARTMENT (COUED).

PLANT. IS OWNED AND OPERATED BY CITY OF UKIAH ELECTRIC
8 1. EXISTING 12KV UTILITY LINE FOR WASTEWATER TREATMENT P
lotD
ate: 05
-APR
-2023 1:12:22
PM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
03E05
LA
S
T
SAVED
B
Y:

PROJECT NO. FILE NAME:

HQR
SMB

ELECTRICAL
8660F10 8660F1003E05.dgn
JGB

DEMO ONE-LINE DIAGRAM

CAROUSEL PUMP STATION
99 ggraham
Digitally signed by Erik M. Bahneman
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 15:30:10-07'00'
200

Page 338 of 1800 ends

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 199

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
TM
225 AT
3P
65 KAIC
600 AF
TM
225 AT
3P
65 KAIC
225 AF
150 AT
3P
150 AF
TM
150 AT
3P
65 KAIC
600 AF
TM
65 KAIC
MCC-D
K K
TM
300 AT
3P
65 KAIC
600 AF
300 AT
3P
TM
65 KAIC
400 AF
K
TM
300 AT
3P
65 KAIC
600 AF
400 AT
3P
400 AF TM
65 KAIC
K
MCC-C
400 AT
3P
600 AF TM
65 KAIC 400 AT
3P
600 AF TM
65 KAIC
MCC70293
K K
TM
300 AT 65 KAIC
3P
600 AF
K
TM
300 AT 65 KAIC
3P
600 AF
K
MCC70292
TM
300 AT 65 KAIC
3P
600 AF
K
TM
300 AT 65 KAIC
3P
600 AF
K
MCC70291
1600 AT 65 KAIC
3P
1600 AF SS-LSIG
1600 AT 65 KAIC
3P
1600 AF SS-LSIG

SPD SPD
1600 AT
3P
1600 AF
52-B4
1600 AT
3P
1600 AF
52-A4
SS SS
4000 AT
3P
5000 AF
52-M
SS
2500 AT
3P
3200 AF
52-G1
SS
100 KAIC
100 KAIC 100 KAIC
52-AT
100 KAIC
SWR12101, 5000AMPS, 480V, 3Ø, 4WIRE, 60HZ, 100KAIC
~
G
3 PHASE
480V
1875KVA/1500KW
4 WIRE

0.8 PF
GEN-1
3 PHASE
TFR-1
2500 KVA
12KV
480V

5.75%

UTILITY
SWB70281, 1600 AMPS, 480 V, 3 PHASE, 3 WIRE, 60 HZ, 65 KASC RMS SWB70282, 1600 AMPS, 480 V, 3 PHASE, 3 WIRE, 60 HZ, 65 KASC RMS

NC NC NC NO NC NO NC NO NO NO
NC
NC
NC
NC NC
NC
NC
NO
NO
P
lotD
ate: 05
-APR
-2023 1:12:12
PM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
03E06
LA
S
T
SAVED
B
Y:

PROJECT NO. FILE NAME:

HR
SMB

ELECTRICAL
SWBD70281 AND SWBD70282

ONE-LINE DIAGRAM
8660F10 8660F1003E06.dgn
GENERAL NOTES:
# KEY NOTES:

COMPLETE ONE-LINE DIAGRAM.

WHERE NEEDED, OR REFER TO OWNER'S RECORD DRAWING FOR
SHOWS SELECTIVE LOADS AND CONNECTIONS. FIELD VERIFY

3. ONE-LINE DIAGRAM FOR THIS EQUIPMENT IS PARTIAL AND ONLY BUILDING.

2. EXISTING SWITCHBOARD IS LOCATED INSIDE DAFT ELECTRICAL BUILDING.

1. EXISTING SWITCH GEAR IS LOCATED INSIDE POWER GENERATION 1 3
2 2
JGB
avates
SHALL FIELD VERIFY WHERE NEEDED.

AND MAY NOT REFLECT EXACT FIELD CONDITION. CONTRACTOR

3. EXISTING EQUIPMENT INFORMATION ARE FROM RECORD DRAWINGS CONTRACTOR SHALL FIELD VERIFY WHERE NEEDED.

DRAWINGS AND MAY NOT REFLECT ACTUAL FIELD INFORMATION.

STATUS (OPEN/CLOSE), AND TRIP SETTINGS ARE FROM RECORD

2. EXISTING BREAKERS TYPE, RATINGS, FRAME SIZES, BREAKER

1. EXISTING SWITCHBOARD IS SQUARE D TYPE QED.
100
Digitally signed by Erik M. Bahneman
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 15:30:26-07'00'
200

Page 339 of 1800 ends

20" 20"
90"
20" 20" 20" 20" 20"

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 199

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®

FRONT VIEW SIDE VIEW
FILE:

SCALE:

FILE:

SCALE:
#
GENERAL NOTES:

KEY NOTES:

2. REMOVE AND DISPOSE OF EXISTING MCC BUCKET COVER.

INSIDE MCC BUCKET.

1. REMOVE AND DISPOSE OF EXISTING ELECTRICAL EQUIPMENT
1 A -
B -
C -
D -
E -
F -
G -
H -
I -
J -
K -
L -
2 3 4 5 6
1 2
2 1
1 2 2 2
1A- SPACE 2A- SPACE 3A- SPACE 4A- SPACE 5A- FILTER

SURFACE WASH
PUMP
6A- METERING
1C- AWT
PUMP NO. 1
2C- AWT
PUMP NO. 3
3C- AIR WASH
BLOWER NO. 2
4C- FILTER

BACKWASH
PUMP NO. 2
5C- WASHWATER

SLUDGE PUMP
6C- MAIN BREAKER 1
1F- AWT
PUMP NO. 2
2F- AIR WASH
BLOWER NO. 1
3F- FILTER

BACKWASH
PUMP NO. 1
4G- AIR

COMPRESSOR
5E- DP1

DISTRIBUTION
PANEL 1
6H- MAIN BREAKER 2
1I- HWCP-5

HOT WATER
PUMP
2I- SPACE 3JL3JRUH-9

UNIT HEATER

ROLL UP DOOR
4I- WASHWATER

RETURN PUMP
1K- RAPID MIX
PUMP
2K- SPACE 3L- SPACE 4KL4KRXFMR-A
PNL-A

LIGHTING

PANELBOARD
DP1

DISTRIBUTION
PANEL 1
1 1. EXISTING MCC IS WESTINGHOUSE, SERIES 2100.
3/4" = 1'-0"
8660F1003E9621
3/4" = 1'-0"
8660F1003E9621
1 P
lotD
ate: 05
-APR
-2023 1:12:30
PM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
03E09
LA
S
T
SAVED
B
Y:

PROJECT NO. FILE NAME:

HQR
SMB

ELECTRICAL
8660F10 8660F1003E09.dgn

MCC-C DEMO ELEVATION
JGB
101
bshepard
Digitally signed by Erik M. Bahneman
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 15:23:53-07'00'
200

Page 340 of 1800 ends

20" 20"
90"
20" 20" 20" 20" 20"

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 199

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®

FRONT VIEW SIDE VIEW
FILE:

SCALE:

FILE:

SCALE:
1 A -
B -
C -
D -
E -
F -
G -
H -
I -
J -
K -
L -
2 3 4 5 6
#
GENERAL NOTES:

KEY NOTES:
1 1
2 1 1 1 1
1 3
NOT COMPLETELY FILL SPACE OF REMOVED UNIT.

3. PROVIDE COVERS FOR MCC AS NEEDED WHERE NEW UNITS DO
ACTUAL EQUIPMENT DIMENSIONS IN THE FIELD.

2. EXISTING MCC OVERALL DIMENSIONS MAY NOT REFLECT THE

1. EXISTING MCC IS WESTINGHOUSE, SERIES 2100.
3/4" = 1'-0"
8660F1003E0621
3/4" = 1'-0"
8660F1003E0621
ELEVATION TABLE.

3. RELABEL EXISTING MCC BUCKET ACCORDING TO MCC

2. PROVIDE NEW COVER.

CONTROL SCHEMATICS, AND SPECIFICATIONS.

NECESSARY EQUIPMENT ACCORDING TO ONE-LINE DIAGRAMS,

1. PROVIDE NEW BREAKER, MOTOR STARTERS AND ALL THE
1 1
1A- FAN-85109

AIR WASH
BLOWER
FAN NO. 1
2A- FAN-85110

AIR WASH
BLOWER
FAN NO. 2
3A- FAN-85111

AIR WASH
BLOWER
FAN NO. 3
4A- DP2

DISTRIBUTION
PANEL 2
5A- FILTER

SURFACE WASH
PUMP
6A- METERING
1C- AWT
PUMP NO. 1
2C- AWT
PUMP NO. 3
3C- BLO-85107

AIR WASH
BLOWER NO. 2
4C- FILTER

BACKWASH
PUMP NO. 2
5C- PMP-87134

BACKWASH

CHLORINE

SAMPLE PUMP
6C- MAIN BREAKER
A
1F- AWT
PUMP NO. 2
2F- BLO-85106

AIR WASH
BLOWER NO. 1
3F- FILTER

BACKWASH
PUMP NO. 1
4G- AIR

COMPRESSOR
5E- DP1

DISTRIBUTION
PANEL 1
6H- MAIN BREAKER
B
1I- HWCP-5

HOT WATER
PUMP
2I- BLO-85108

AIR WASH
BLOWER NO. 3
3JL3JRUH-9

UNIT HEATER
________________

ROLL UP DOOR
4I- SPARE NEMA 2
1K- PMP-85104

RAPID MIX
PUMP
2L- SPACE 3L- SPACE 4KL4KR
-
XFMR-A
PNL-A

LIGHTING

PANELBOARD
________________
DP1

DISTRIBUTION
PANEL 1

BREAKER
P
lotD
ate: 05
-APR
-2023 1:11:30
PM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
03E10
LA
S
T
SAVED
B
Y:

PROJECT NO. FILE NAME:

HQR
SMB

ELECTRICAL
8660F10 8660F1003E10.dgn

ELEVATION

MCC-C MODIFIED
JGB
102
bshepard
Digitally signed by Erik M. Bahneman
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 15:24:59-07'00'
200

Page 341 of 1800 ends
← All documents from this meeting