Panelboards
16445-3 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16445 (CONFORMED)
1.07 DELIVERY, STORAGE, AND HANDLING (NOT USED)
1.08 PROJECT OR SITE CONDITIONS
A. As specified in Section 01850 - Design Criteria.
1.09 SEQUENCING (NOT USED)
1.10 SCHEDULING (NOT USED)
1.11 WARRANTY
A. As specified in Section 01783 - Warranties and Bonds.
1.12 SYSTEM START-UP (NOT USED)
1.13 OWNER’S INSTRUCTIONS (NOT USED)
1.14 MAINTENANCE (NOT USED)
PART 2 PRODUCTS
2.01 MANUFACTURERS
A. One of the following or equal:
1. Eaton.
2. GE by ABB.
3. Schneider Electric.
B. Circuit breakers:
1. Same manufacturer as the panelboard.
2.02 EXISTING PRODUCTS (NOT USED)
2.03 MATERIALS (NOT USED)
2.04 MANUFACTURED UNITS (NOT USED)
2.05 EQUIPMENT
A. Provide panelboards with:
1. Molded-case circuit breakers with trip ratings as shown on the panel schedules.
2. Spares and spaces for future circuit breakers in panels as shown on the panel schedules.
Panelboards
16445-4 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16445 (CONFORMED) B. Short circuit rating:
1. Provide panelboards with short-circuit ratings as indicated on the Drawings:
2. Testing method in accordance with UL 67.
3. Mark each panelboard with its maximum short circuit rating at the supply voltage.
4. Panelboards shall be fully rated.
2.06 COMPONENTS
A. Enclosure:
1. NEMA enclosure type as indicated on the Drawings.
a. Where not indicated on the Drawings, as specified in Section 16050 - Common Work Results for Electrical for the installed location.
2. Minimum width: 20 inches.
3. Gutter space in accordance with the NEC:
a. Minimum of 4 inches of gutter space.
4. Dead-front, no live parts when the panelboard is in service.
5. Enclose entire panelboard bus assembly in a corrosion resistant galvanized steel cabinet.
6. 4-piece front to provide ease of wiring access.
7. Lockable, hinged door over the protective devices with a flush, cylinder tumbler-type lock with catch and door pull.
a. Minimum 2 keys per panelboard.
b. Key all panelboard locks alike.
1) Match locks on existing panelboards to the extent possible.
8. Circuit directory frame and card on the inside of the door.
9. Door-in-door construction consists of a one-piece front with 2 doors:
a. The smaller door provides access to all device handles and rating labels and shall be lockable.
b. The larger door provides access to all conductors and wiring terminals.
10. Interior design such that replacement of circuit breakers does not require disturbing adjacent units or removal of the main bus connectors.
11. Outdoor locations: Provide NEMA Type 4X enclosures with a NEMA Type 4X stainless steel outer enclosure (with a hinged door) and a NEMA Type 1 interior panelboard, unless otherwise indicated.
B. Bus:
1. General:
a. Tin-plated copper.
2. Phase bus:
a. Full size and height without reduction.
b. Dimensions and temperature rise in accordance with UL 67:
1) Limit current density to less than 1,000 amps per square inch. c. Insulate all current carrying parts from ground and phase-to-phase with a high dielectric strength insulator.
3. Ground bus:
a. Copper, solidly bonded.
Panelboards
16445-5 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16445 (CONFORMED)
4. Neutral bus:
a. Provide where indicated on the Drawings.
b. 100 percent rated.
c. Provide lugs for each outgoing feeder requiring a neutral connection.
5. Provide insulation barriers over the vertical bus behind the dead front shield to provide increased safety during field service.
C. Lugs:
1. UL listed for copper and aluminum wire:
a. Provide lugs rated for 75-degree Celsius terminations. b. Provide bolted or compression main lug terminations as required for the incoming cable size.
D. Circuit breakers: As specified in Section 16412 - Low Voltage Molded Case Circuit Breakers and as indicated on the Drawings:
1. Provide all circuit breakers with bolt-on connections:
a. Plug-in circuit breakers are not allowed.
2.07 ACCESSORIES
A. Surge protective devices:
1. Furnish panelboards with surge protective devices as indicated on the Drawings.
2. As specified in Section 16285 - Surge Protective Devices.
B. Nameplates:
1. As specified in Section 16075 - Identification for Electrical Systems.
2. Install on outside of door.
3. Indicating:
a. Panel designation.
b. Voltage.
c. Number of phases and configuration.
C. Circuit identification labels:
1. Provide index cards behind heavy clear plastic in cardholders on the inside of the doors.
2. Type all information on the cards using designations in the panel schedules.
3. Laminated on both sides.
D. Pad locking mechanism:
1. Provide a pad locking attachment to allow circuit breakers to be locked in the off position.
2. At a minimum, provide 1 mechanism per panelboard:
a. Provide multiple mechanisms if required to accommodate all circuit breaker frame sizes in the panelboard.
Panelboards
16445-6 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16445 (CONFORMED)
2.08 MIXES (NOT USED)
2.09 FABRICATION (NOT USED)
2.10 FINISHES
A. Finish stand-alone panelboards with a primer, rust-resistant phosphate undercoat, and 2 coats of oven-baked enamel with manufacturer’s standard gray.
B. Finish panelboards mounted in motor control centers to match the motor control center finish and color.
2.11 SOURCE QUALITY CONTROL (NOT USED)
PART 3 EXECUTION
3.01 EXAMINATION (NOT USED)
3.02 PREPARATION (NOT USED)
3.03 INSTALLATION
A. Install the equipment in accordance with the accepted installation instructions and anchorage details to meet the seismic and wind load requirements at the Project site.
B. General:
1. Mounted as indicated on the Drawings.
2. Mount rigidly to structural members with exposed surfaces plumb and level to within 1/32 inch.
3. Perform work in accordance with the manufacturer’s instructions and shop drawings.
4. Provide all brackets, hangers, supports, and hardware for mounting as required.
5. In all NEMA Type 4 and NEMA Type 4X locations, mount panelboards on 7/8-inch deep stainless steel preformed channel, with channel running vertically from top to bottom of panelboard:
a. Use only stainless steel mounting hardware.
6. Mount panelboard so that top operating handle is not more than 6 feet-7 inches above the operating floor.
3.04 ERECTION, INSTALLATION, APPLICATION, CONSTRUCTION (NOT USED)
3.05 REPAIR/RESTORATION (NOT USED)
3.06 RE-INSTALLATION (NOT USED)
Panelboards
16445-7 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16445 (CONFORMED)
3.07 COMMISSIONING
A. As specified in Section 01756 - Commissioning.
B. Factory testing:
1. Perform standard factory tests on the panelboards:
2. Test in accordance with the latest version of NEMA and UL standards.
3.08 FIELD QUALITY CONTROL
A. As specified in Section 16050 - Common Work Results for Electrical.
3.09 ADJUSTING (NOT USED)
3.10 CLEANING
A. As specified in Section 16050 - Common Work Results for Electrical.
3.11 PROTECTION (NOT USED)
3.12 SCHEDULES
A. Circuiting within the panelboard shall match the panel schedules as indicated on the Drawings.
B. Provide typewritten schedule in each panelboard.
END OF SECTION
Low Voltage Fuses
16494-1 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16494 (CONFORMED) SECTION 16494
LOW VOLTAGE FUSES
PART 1 GENERAL
1.01 SUMMARY
A. Section includes:
1. Fuses: 600-volt class and lower.
1.02 REFERENCES
A. As specified in Section 16050 - Common Work Results for Electrical.
1.03 DELEGATED DESIGN (NOT USED)
1.04 SUBMITTALS
A. Furnish submittals as specified in Sections 01330 - Submittal Procedures.
B. Product data:
1. Catalog cut sheets.
2. Complete fuse schedule.
3. Manufacturer original 11-inch by 17-inch, time current curves for all fuses furnished.
C. Shop drawings:
1. Include drawings of spare fuse cabinets.
1.05 QUALITY ASSURANCE
A. All low voltage fuses shall be UL listed and labeled.
1.06 DELIVERY, STORAGE, AND HANDLING (NOT USED)
1.07 PROJECT OR SITE CONDITIONS
A. As specified in Section 01850 - Design Criteria.
1.08 ADMINISTRATIVE REQUIREMENTS (NOT USED)
1.09 WARRANTY
A. As specified in Section 01783 - Warranties and Bonds.
Low Voltage Fuses
16494-2 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16494 (CONFORMED)
1.10 MAINTENANCE
A. Spare parts:
1. Provide 3 spare fuses for each size and type used or supplied under any Section of the Contract Documents.
2. Provide spare fuse cabinet(s):
a. Metal cabinet with hinged door and shelves or fuse holders. b. Gray enamel finish.
c. Mount near equipment and label "Spare Fuses" on face of cabinet. d. Suitable pocket inside door of each cabinet with typewritten spare fuse inventory in clear plastic protective insert.
e. Provide as many cabinets as required to hold entire spare fuse inventory.
PART 2 PRODUCTS
2.01 GENERAL
A. Fuses for overcurrent protection and/or current limiting applications as indicated on the Drawings.
2.02 DESIGN AND PERFORMANCE CRITERIA (NOT USED)
2.03 MANUFACTURERS
A. One of the following or equal:
1. Bussmann.
2. Ferraz Shawmut.
3. Littelfuse.
2.04 MATERIALS (NOT USED)
2.05 MANUFACTURED UNITS
A. General:
1. Provide durable, readily visible label inside each fuse enclosure, clearly indicating the correct type, size, and ratings of replacement fuse:
a. Label shall not cover or interfere with equipment manufacturer's instructions.
2. Affix a label indicating recommended torque for fuse mounting bolts or studs to the inside of fuse access doors.
3. To ensure selective coordination of protective devices:
a. Provide fuses for new facilities by the same manufacturer. b. Provide fuses for renovations of the same manufacturer as existing fuses.
4. Provide fuses rated for the voltage and available short circuit current at which they are applied.
Low Voltage Fuses
16494-3 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16494 (CONFORMED) B. Fuses for services, switchboard mains, feeders, and branch circuits:
1. 600 amperes and less:
a. Provide UL listed RK1 dual-element, time-delay fuses with ampere ratings as indicated on the Drawings except as may be modified by the Contract Documents.
2. 601 to 6,000 amperes:
a. Provide UL listed Class L fuses.
C. Fuses for motor branch circuits:
1. Ampere ratings shall not exceed motor controller manufacturer’s recommended values:
a. If manufacturer does not have such standards, provide fuses as specified in this Section.
2. Provide Class RK1 fuses or fuses as indicated on the Drawings and as specified in the Contract Documents, rated in accordance with the fuse manufacturer’s recommendations for backup running protection of motor circuits containing overload relays.
3. Determine fuse ratings for overload protection of motor branch circuits by actual full-load currents of motors provided.
4. Fuses in motor control centers may be time-delay Class J or Class CC fuses, if MCC manufacturer’s standard designs use these fuse types:
a. Time-delay Class J fuse ratings shall not exceed 150 percent of motor full load current except as permitted.
b. Follow fuse manufacturer’s recommendations for Class CC fuses. c. A motor having starting duty or other special characteristics requiring larger fuses than specified above, may have branch circuit fuse ratings increased as necessary to meet motor’s requirements, but no larger than maximum permitted by the NEC.
1) Increased requirements for an individual motor shall not be cause for increasing size of all fuses.
5. Provide Class L fuses for motor branch circuits requiring fuses over 600 amperes, sized at 150 percent of motor full load current except as permitted below:
a. A motor having starting duty or other special characteristics requiring larger fuses than specified above, may have branch circuit fuse ratings increased as necessary to meet motor’s requirements, but no larger than maximum permitted by the NEC.
1) Increased requirements for an individual motor shall not be cause for increasing size of all fuses.
D. Fusing of control circuits:
1. Provide:
a. RK1 fuses installed in UL listed Class CC fuse blocks as specified in the Contract Documents.
2. Provide minimum protection for control circuits in accordance with the latest revision of UL Standard 508 for Industrial Control.
3. Fuse both the primary and secondary circuit of control power transformers:
a. Fuse ratings shall be in accordance with NEC requirements.
Low Voltage Fuses
16494-4 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16494 (CONFORMED) PART 3 EXECUTION
3.01 EXAMINATION (NOT USED)
3.02 PREPARATION (NOT USED)
3.03 INSTALLATION
A. General:
1. Install fuses properly aligned, electrically and mechanically secure.
2. Evenly torque mounting bolts and nuts to ASTM recommendations for type and diameter of mounting bolts or studs provided.
3. Paralleling of fuses is not permitted.
4. Install fuses so that the fuse nameplate and rating are easily readable in the equipment.
B. Replace fuses, on all phases, for any fuses that opened during start-up and testing.
C. After completion of testing, deliver spare fuses in quantities specified:
1. Fuses shall be new, in manufacturer's original packaging, and stored in a clean, dry location.
D. Install spare fuse cabinets where instructed by the Owner.
3.04 COMMISSIONING
A. As specified in Section 01756 - Commissioning.
END OF SECTION
Lighting: LED Luminaires
16510-1 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16510 (CONFORMED) SECTION 16510
LIGHTING: LED LUMINAIRES
PART 1 GENERAL
1.01 SUMMARY
A. Section includes: LED luminaires, drivers, poles, and accessories.
1.02 REFERENCES
A. As specified in Section 16050 - Common Work Results for Electrical.
B. Illuminating Engineering Society (IES):
1. LM-79 - Approved Method: Optical and Electrical Measurements of Solid-State Lighting Products.
2. LM-80 - Measuring Luminous Flux and Color Maintenance of LED Packages, Arrays and Modules.
3. TM-21 - Projecting Long Term Lumen, Photon, and Radiant Flux Maintenance of LED Light Sources.
4. RP-7 - Recommended Practice for Lighting Industrial Facilities.
C. Institute of Electrical and Electronics Engineers (IEEE):
1. C62.41 - IEEE Recommended Practice for Surge Voltages in Low-Voltage AC Power Circuits.
D. National Electrical Manufacturers Association (NEMA):
1. 410 - Performance Testing for Lighting Controls and Switching Devices with Electronic Drivers and Discharge Ballasts.
E. Underwriters Laboratories (UL):
1. 1598 - Luminaires.
2. 8750 - Light Emitting Diode (LED) Equipment For Use In Lighting Products.
1.03 DEFINITIONS
A. As specified in Section 16050 - Common Work Results for Electrical.
B. Specific definitions and abbreviations:
1. CCT: Correlated color temperature - Scientific scale to describe how “warm” or how “cool” the light source is, measured in Kelvin. The lower the Kelvin temperature, the warmer the light feels, or appears.
2. CRI: Color Rendering Index - A quantitative measure of the ability of a light source to reveal the colors of various objects faithfully in comparison with an ideal or natural light source.
3. Driver - Device that manages power and controls the current flow from AC to DC for an LED lighting product.
Lighting: LED Luminaires
16510-2 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16510 (CONFORMED)
4. Efficacy - Lumen output of a light source per unit of power supplied to that source (lumens per watt).
5. EMI: Electromagnetic Interference - Electrical interference (noise) generated by electrical and electronic devices.
6. FC: Foot Candles - Measure of light level on a surface being illuminated.
7. L70 - The extrapolated life in hours of the luminaire when the luminous output depreciates 30 percent from initial values.
8. LED: Light emitting diode - A solid-state semiconductor device that produces light when electrical current flows through it.
9. LED light source - See LED luminaire.
10. LED luminaire - A complete lighting unit consisting of LED-based light emitting elements and a matched driver together with parts to distribute light, to position and protect the light emitting elements, and to connect the unit to a branch circuit.
11. Lumen - The international (SI) unit of luminous flux or quantity of light. The amount of light that is spread over a square foot of surface by one candle power when all parts of the surface are exactly one foot from the light source.
12. Lumen ambient temperature multiplier - LED light source relative lumen output when compared to a standard ambient temperature.
13. Lumen maintenance factor - How well an LED light source is able to retain its intensity when compared to new.
14. Luminaire - Lighting unit.
15. THD: Total harmonic distortion - The combined effect of harmonic Distortion on the AC waveform produced by a driver or other device.
1.04 SUBMITTALS
A. Furnish submittals as specified in Section 01330 - Submittal Procedures.
B. Product data:
1. LED Luminaires:
a. Catalog literature for each luminaire specified, cross-referenced to the luminaire type on the Luminaire Schedule in the Drawings. b. Provide for each luminaire type:
1) Materials.
2) Type of diffuser.
3) Hardware.
4) Gasketing.
5) Reflector.
6) Chassis.
7) Finish and color.
8) Driver type and protection.
9) LED luminaire:
a) Initial lumen output at 40 degrees Celsius ambient.
b) Correlated color temperature.
c) Lumen maintenance factors.
d) Lumen ambient temperature multipliers.
e) Drive current.
f) Efficacy.
10) Picture of luminaire.
11) IES optical distributions.
Lighting: LED Luminaires
16510-3 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16510 (CONFORMED) 12) Dimensioned drawings:
a) Effective projected area rating for pole mounted luminaires. 13) Weight.
14) Photometric data:
a) Coefficient of utilization tables based on the IES zonal cavity system by an approved testing laboratory.
b) Luminaire dirt depreciation factor.
c) Candlepower distribution curves.
d) Average luminaire brightness.
e) Lumen output charts.
15) Furnish support method for interior luminaires weighing more than 30 pounds and all wall-mounted luminaires:
a) Support methods shall be based on seismic requirements at the project site as specified in Section 01850 - Design Criteria. c. Luminaire substitutions:
1) Provide complete literature for each luminaire substitution:
2) Submittals for substituted luminaires shall be sufficient for competent comparison of the proposed luminaire to the originally specified luminaire:
a) Photometric data:
(1) IES file in standard IES format.
(2) Coefficient of utilization tables based on the IES zonal cavity system by an approved testing laboratory.
(3) Candlepower distribution curves.
(4) Average luminaire brightness.
(5) Lumen output charts.
(6) Power requirements in watts and volt-amperes.
b) Calculations:
(1) Provide software generated calculations showing
illuminance levels in footcandles and power usage in watts per square foot for each of the areas in which substitutions are proposed:
(a) Use surface reflectance values in accordance with
IES RP-7.
(b) Use manufacturer Projected Lumen Maintenance
factor for minimum of 60,000 hours to perform all
calculations.
c) Specification sheets:
(1) If lacking sufficient detail to indicate compliance with contract documents, standard specification sheets will not be accepted. This includes, but is not limited to, luminaire type designation, manufacturer's complete catalog number, voltage, LED type, CCT, CRI, specific driver information, system efficacy, L70 life rating, and any modifications necessary to meet the requirements of the contract
documents.
3) Substitutions for specified luminaires will be evaluated upon quality of construction, light distribution, energy use, appearance, and maintenance.
4) Substitutions shall comply with all applicable building and energy codes.
Lighting: LED Luminaires
16510-4 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16510 (CONFORMED)
2. Driver: Provide for each driver type:
a. Catalog number.
b. Type of driver.
c. Output wattage.
d. Input voltage.
e. Operating voltage range.
f. Maximum input power.
g. Efficiency.
h. Operating line current.
i. Power factor.
j. Operating temperature range.
k. Current output range in ambient temperatures of 30 to 55 degrees Celsius.
l. Surge suppression data.
3. Photocell:
a. Provide for each photocell type:
1) Switching capacity.
2) Life expectancy when used on LED sources.
3) The means of adjusting the lighting pickup level.
4) Enclosure type.
5) Mounting method.
4. Luminaire poles:
a. Submit complete data for each pole type including but not limited to:
1) Material.
2) Finish and color.
3) Handholes.
4) Anchoring.
5) Luminaire attachment methods and fittings.
6) Pole height.
7) Pole dimensions.
8) Bolt hole circle layout and hardware.
9) Accessories.
10) Provide the EPA wind load rating.
C. Calculations:
1. Provide complete design calculations and installation documents for pole mounting piers and poles mounted from structures:
a. Include in the calculations the wind and seismic requirements at the project site.
b. Calculations and design shall be performed by and signed by a Professional Engineer registered in the state where the project is being constructed:
D. Record documents:
1. Update the Luminaire Schedule in the Drawings to reflect the acceptable substitutions, after the substitution has been reviewed and accepted by the Engineer.
1.05 QUALITY ASSURANCE
A. Luminaires shall be UL listed and labeled.
Lighting: LED Luminaires
16510-5 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16510 (CONFORMED)
1.06 DELIVERY, STORAGE, AND HANDLING (NOT USED)
1.07 PROJECT OR SITE CONDITIONS
A. As specified in Section 01850 - Design Criteria.
1.08 SEQUENCING (NOT USED)
1.09 SCHEDULING
A. Exterior and outdoor lighting system operation shall be demonstrated during the hours of darkness.
B. Lighting demonstration shall occur within 2 weeks before substantial completion.
1.10 WARRANTY
A. As specified in Section 01783 - Warranties and Bonds.
B. LED luminaire:
1. 5-year warranty from the date of installation including material, workmanship, photometrics, driver, and LED modules.
1.11 SYSTEM START-UP
1.12 OWNER’S INSTRUCTIONS (NOT USED)
1.13 MAINTENANCE
A. Furnish 1 complete spare LED luminaire, with driver, of each type used.
PART 2 PRODUCTS
2.01 MANUFACTURERS
A. Luminaires:
1. The following or equal:
a. As noted on the Luminaire Schedule.
B. Drivers:
1. One of the following or equal:
a. Philips Advance.
b. Thomas Research.
c. eldoLED.
C. Substitutions:
1. The lighting design and luminaire selection has been based upon the photometric data of the identified luminaire. It is the Contractor’s responsibility to ensure and prove to the Engineer at time of submittal the substitutions meet the quality and photometric requirements of the original design.
Lighting: LED Luminaires
16510-6 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16510 (CONFORMED)
2.02 SYSTEM DESCRIPTION
A. Provide luminaires, and accessories for all lighting systems, complete and operable, in accordance with the requirements of the Contract Documents.
B. Individual luminaire types are indicated on the Drawings and on the Luminaire Schedule.
2.03 EXISTING PRODUCTS (NOT USED)
2.04 MATERIALS (NOT USED)
2.05 MANUFACTURED UNITS (NOT USED)
2.06 EQUIPMENT
A. LED Luminaires:
1. General:
a. Pre-wired with leads of 18-AWG, minimum, for connection to building circuits.
b. Provide the luminaires furnished per the Luminaire Schedule in the Drawings:
1) The Specifications noted in this Section are an addition or supplement to the Luminaire Schedule.
c. Individual LEDs connected such that a catastrophic loss or the failure of 1 LED will not result in the loss of the entire luminaire.
2. Minimum ambient temperature range of 0 degrees Celsius to 40 degrees Celsius.
3. Minimum rated life:
a. Process Areas: 100,000 hours when operated at 40 degrees Celsius.
4. Minimum efficacy of 70 lumens/watt.
5. Minimum Color Rendering Index of 70.
6. Tested according to IES LM-79 and LM-80.
7. Lumen maintenance projection in accordance with IES TM-21.
8. RoHS compliant.
9. Integral driver.
10. Suitable for dry, damp, or wet locations as indicated on the Drawings or on the Luminaire Schedule.
a. Wet or damp locations: UL 1598 listed.
11. Designed as a complete LED assembly. Retrofit LED lamps in luminaires not designed specifically for LED light sources shall not be used.
12. Exterior/outdoor luminaires:
a. Luminaires in combination with their mounting pole and bracket shall be capable of withstanding:
1) Wind levels at the project site without damage.
2) Seismic levels at the project site.
b. Corrosion-resistant hardware and hinged doors or lens retainer. c. Luminaires furnished with integral photoelectrical control shall be of the luminaire manufacturer's standard design.
Lighting: LED Luminaires
16510-7 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16510 (CONFORMED) d. California Energy Code Light Pollution Reduction Compliance:
1) Provide all exterior luminaires with cutoff photometrics. a) Luminaire design shall allow no more than 0.01 horizontal footcandles to escape beyond the site boundary.
2) Provide exterior luminaires with photocells to automatically control exterior lighting dusk to dawn to turn off or lower the lighting levels during inactive periods. Reference the Drawings for specific luminaires to be controlled.
B. Photo-electric cells:
1. Photoelectric cell for control of a single luminaire:
a. Integral to the luminaire.
C. Drivers:
1. Dimmable, with dimming signal protocol of 0-10 VDC or DALI.
2. Input power source:
a. As indicated on the Drawings.
3. Drive current:
a. As indicated in the Luminaire Schedule.
4. Power factor: greater than 0.90.
5. Efficiency: greater than 80 percent.
6. Total harmonic distortion (THD) of the input current less than 20 percent.
7. Rated life of 60,000 hours in an LED luminaire operated at an ambient temperature of 40 degrees Celsius.
8. Minimum operating temperature of 0 degrees Celsius.
9. Sound rating: Class A+ or quieter.
10. UL listed Class 2 Outdoor in accordance with UL 8750.
11. In accordance with IEEE C62.41 Category A for transient protection.
12. Driver must limit inrush current:
a. Meet or exceed NEMA 410 driver inrush standard:
1) 230 Amps per 10 Amp load with a maximum of 106 Amps
squared-seconds at 120V.
2) 430 Amps per 10 Amp load with a maximum of 370 Amps
squared-seconds at 277V.
2.07 COMPONENTS
A. Luminaire poles:
1. As indicated on the Luminaire Schedule.
2. Anchor bolts:
a. Use anchor bolts, bolts, or welded studs for anchors for resisting seismic and wind forces.
1) Standard hex bolt head.
2) Do not use anchor bolts fabricated from rod stock with an L or J-shape.
b. Complete with leveling shims.
3. Anchor base:
a. Fabricated from the same type of material as the pole shaft. b. Base plate to telescope the pole shaft.
c. Welded top and bottom along the entire perimeter.
d. With slotted bolt holes on the bolt circles as submitted.
Lighting: LED Luminaires
16510-8 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16510 (CONFORMED)
4. Pole shaft:
a. As indicated on the Luminaire Schedule.
5. Handhole:
a. Reinforced handhole located approximately 18 inches above the base. b. Complete with cover fabricated from the same material as the pole shaft and stainless steel attachment screws.
c. With an integral ground connection nut, 1/2 inch by 13 inch UNC welded to the pole for connection to the grounding system.
6. Shroud:
a. Fabricated from the same type of material as the pole shaft. b. 1-piece formed channel section that shall conform to the pole shaft taper. c. Secured by a locking device with provisions for a padlock to prevent accidental lowering.
7. Fastening hardware:
a. All fasteners shall be stainless steel.
8. Finish:
a. As indicated on the Luminaire Schedule.
2.08 ACCESSORIES
A. Pole mounted convenience outlet:
1. Where indicated, furnish a 120 Volt, GFCI protected receptacle:
a. Integrally mounted in the pole shaft at 24 inches above the base.
2. Complete with corrosion resistant and weatherproof cover.
2.09 MIXES (NOT USED)
2.10 FABRICATION (NOT USED)
2.11 FINISHES (NOT USED)
2.12 SOURCE QUALITY CONTROL (NOT USED)
PART 3 EXECUTION
3.01 EXAMINATION (NOT USED)
3.02 PREPARATION (NOT USED)
3.03 INSTALLATION
A. Install luminaires per the manufacturer’s guidelines and submitted installation calculations to meet seismic and wind requirements at the project site.
B. Special techniques:
1. Support luminaires from structural elements capable of carrying the total weight.
Lighting: LED Luminaires
16510-9 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16510 (CONFORMED)
2. Install luminaires plumb and square with building and wall intersections:
a. Suspend pendant-mounted luminaries that are mounted from sloping ceilings with ball hangers, unless otherwise indicated on the Drawings. b. Install luminaires in machinery rooms after machines have been installed, so as to ensure no conflict with machinery, piping, or ductwork.
3. In all cases, coordinate luminaire locations with work of other trades to prevent obstruction of light from the fixtures:
a. Locate bottom of luminaire approximately at the bottom of ductwork, unless otherwise specified or indicated on the Drawings.
4. Support luminaires weighing more than 25 pounds independently of the outlet box and the conduit.
5. Provide ceiling or pendent mounted luminaires with a safety chain connecting the lens, driver, and other components to the building structure.
6. Provide recessed luminaires with auxiliary safety supports attached directly to the building structure:
a. The safety supports shall consist of number 12 AWG soft drawn galvanized wires.
7. Install luminaires in accordance with the architectural reflected ceiling Drawings:
a. Center luminaires on ceiling tiles unless otherwise indicated.
8. Support luminaires installed in suspended grid ceilings, independently of the grid:
a. Provide seismic restraint clips for all luminaires installed in suspended grid ceilings.
C. Luminaire poles:
1. Set poles on anchor bolts and secured with double nuts on each bolt.
2. Dry-pack the pole base, after the luminaire and pole has been leveled and plumbed.
3. Bond metal poles to the plant grounding system, utilizing a ground lug connection within the pole:
a. Route ground conductor through pier and pole base sleeve using Schedule 40 PVC conduit.
3.04 ERECTION, INSTALLATION, APPLICATION, CONSTRUCTION (NOT USED)
3.05 REPAIR/RESTORATION (NOT USED)
3.06 RE-INSTALLATION (NOT USED)
3.07 COMMISSIONING
A. As specified in Section 01756 - Commissioning.
3.08 FIELD QUALITY CONTROL
3.09 ADJUSTING
A. Aim and verify all exterior and outdoor luminaires alignment, during dark evening hours, as directed by Owner or the Engineer.
Lighting: LED Luminaires
16510-10 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16510 (CONFORMED)
3.10 CLEANING
A. Clean all lenses, diffusers, and reflectors.
B. Refinish all luminaires’ trim, poles, and support brackets, where finish has been damaged.
C. Clean all LED luminaires (new and old), used during construction for construction lighting, before substantial completion.
D. Clean and re-lamp all existing fluorescent and HID luminaires used during construction for construction lighting, before substantial completion.
3.11 PROTECTION (NOT USED)
3.12 SCHEDULES
A. Refer to the Luminaire Schedule in the Drawings.
END OF SECTION
Field Electrical Acceptance Tests
16950-1 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16950 (CONFORMED) SECTION 16950
FIELD ELECTRICAL ACCEPTANCE TESTS
TABLE OF CONTENTS
PART 1 GENERAL.................................................................................................................3
1.01 SUMMARY ...................................................................................................................3 A. Section includes:................................................................................................3 B. Copyright information:........................................................................................3
1.02 REFERENCES.............................................................................................................3 A. General standards: ............................................................................................3 B. National standards:............................................................................................3
1.03 DEFINITIONS...............................................................................................................3 A. Project definitions:..............................................................................................3 B. Specific definitions: ............................................................................................3
1.04 SYSTEM DESCRIPTION .............................................................................................4 A. General requirements: .......................................................................................4 B. Responsibilities:.................................................................................................4
1.05 SUBMITTALS...............................................................................................................4 A. General submittal requirements:........................................................................4 B. Copper Ethernet test form:.................................................................................4 C. Manufacturers’ testing procedures:....................................................................5 D. Test report:.........................................................................................................5 E. Test data records:..............................................................................................5 F. Testing laboratory qualifications: .......................................................................5 G. Division of responsibilities:.................................................................................5
1.06 QUALITY ASSURANCE...............................................................................................6 A. Testing laboratory qualifications: .......................................................................6
1.07 DELIVERY, STORAGE, AND PROTECTION (NOT USED)........................................6
1.08 PROJECT OR SITE CONDITIONS..............................................................................6 A. General site and project conditions:...................................................................6
1.09 SEQUENCING .............................................................................................................6 A. Prior to testing:...................................................................................................6 B. Perform testing in the following sequence: ........................................................6
1.10 SCHEDULING (NOT USED)........................................................................................6
1.11 WARRANTY.................................................................................................................6 A. As specified in Section 01783 - Warranties and Bonds. ....................................6
1.12 SYSTEM START-UP (NOT USED)..............................................................................6
1.13 OWNER'S INSTRUCTIONS (NOT USED)...................................................................7
1.14 MAINTENANCE (NOT USED) .....................................................................................7 PART 2 PRODUCTS (NOT USED) ........................................................................................7 PART 3 EXECUTION .............................................................................................................7
3.01 EXAMINATION (NOT USED).......................................................................................7
3.02 PREPARATION............................................................................................................7 A. Test instrument calibration:................................................................................7 B. Requirements prior to testing:............................................................................7
3.03 INSTALLATION............................................................................................................7 A. Test decal: .........................................................................................................7
Field Electrical Acceptance Tests
16950-2 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16950 (CONFORMED)
3.04 ERECTION, INSTALLATION, APPLICATION, CONSTRUCTION (NOT USED).........8
3.05 REPAIR/RESTORATION (NOT USED) .......................................................................8
3.06 RE-INSTALLATION (NOT USED)................................................................................8
3.07 COMMISSIONING........................................................................................................8 A. General commissioning requirements: ..............................................................8 B. Testing and Training Phase: Installation Testing:..............................................8 C. Panelboards:......................................................................................................8 D. Switchgear and switchboard:...........................................................................10 E. Dry type transformers: .....................................................................................13 F. Low voltage cables, 600 volt maximum: ..........................................................14 G. Low voltage molded case and insulated case circuit breakers: .......................14 H. Instrument transformers - current transformers: ..............................................16 I. Instrument transformers - voltage transformers:..............................................18 J. Metering devices, microprocessor based: .......................................................19 K. Metering devices electromechanical and solid state:.......................................20 L. Grounding systems:.........................................................................................21 M. Rotating machinery, ac induction motors and generators:...............................21 N. Motor starters, low voltage:..............................................................................23 O. Variable frequency drive systems:...................................................................25 P. Surge arresters, low-voltage:...........................................................................26 Q. Switches, air, medium-voltage, metal-enclosed:..............................................27 R. Fiber-optic cables:............................................................................................29 S. Copper Ethernet cable installation testing: ......................................................30
3.08 FIELD QUALITY CONTROL (NOT USED) ................................................................30
3.09 ADJUSTING (NOT USED) .........................................................................................30
3.10 CLEANING .................................................................................................................30 A. As specified in Section 16050 - Common Work Results for Electrical.............30 B. After the acceptance tests have been completed, dispose of all testing expendables, vacuum all cabinets, and sweep clean all surrounding areas. ..30
3.11 PROTECTION (NOT USED)......................................................................................30
3.12 SCHEDULES (NOT USED)........................................................................................30
Field Electrical Acceptance Tests
16950-3 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16950 (CONFORMED) PART 1 GENERAL
1.01 SUMMARY
A. Section includes:
1. Responsibilities for testing the electrical installation.
2. Adjusting and calibration.
3. Acceptance tests.
B. Copyright information:
1. Some portions of this Section are copyrighted by the InterNational Electrical Testing Association, Inc. (NETA). See NETA publication ATS for details.
1.02 REFERENCES
A. General standards:
1. As specified in Section 16050 - Common Work Results for Electrical.
2. Specification sections for the electrical equipment being tested.
3. Shop drawings.
B. National standards:
1. American National Standards Institute (ANSI).
2. Institute of Electrical and Electronics Engineers (IEEE):
a. 43 - IEEE Recommended Practice for Testing Insulation Resistance of Rotating Machinery.
b. 81 - IEEE Guide for Measuring Earth Resistivity, Ground Impedance, and Earth Surface Potentials of a Grounding System.
c. C57.13 - IEEE Standard Requirements for Instrument Transformers. d. C57.13.1 - IEEE Guide for Field Testing of Relaying Current Transformers.
e. C57.13.3 - IEEE Guide for Grounding of Instrument Transformer Secondary Circuits and Cases.
3. Insulated Cable Engineer’s Association (ICEA).
4. InterNational Electrical Testing Association (NETA). a. ATS- Standard for Standard for Acceptance Testing Specifications for Electrical Power Equipment and Systems.
5. International Electrotechnical Commission (IEC).
6. Manufacturer’s testing recommendations and instruction manuals.
7. National Fire Protection Association (NFPA):
a. 70 - National Electrical Code (NEC).
b. 110 - Standard for Emergency and Standby Power Systems.
8. National Institute of Standards and Technology (NIST).
1.03 DEFINITIONS
A. Project definitions:
1. As specified in Sections 01756 - Commissioning and 16050 - Common Work Results for Electrical.
B. Specific definitions:
1. Testing laboratory: The organization performing acceptance tests.
Field Electrical Acceptance Tests
16950-4 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16950 (CONFORMED)
1.04 SYSTEM DESCRIPTION
A. General requirements:
1. Testing of all electrical equipment installed under this Contract in accordance with the manufacturer’s requirements and as specified in this Section.
2. Conduct all tests in the presence of the Engineer or the Engineer’s representative:
a. Engineer will witness all visual, mechanical, and electrical tests, and inspections.
3. The testing and inspections shall verify that the equipment is operational within the tolerances required and expected by the manufacturer, and these Specifications.
B. Responsibilities:
1. Contractor responsibilities:
a. Ensure that all resources are made available for testing, and that all testing requirements are met.
2. Electrical subcontractor responsibilities:
a. Perform routine tests during installation.
b. Demonstrate operation of electrical equipment.
c. Commission the electrical installation.
d. Provide the necessary services during testing, and provide these services to the testing laboratory, Contractor, and other subcontractors, including but not limited to:
1) Providing electrical power as required.
2) Operating of electrical equipment in conjunction with testing of other equipment.
3) Activating and shutting down electrical circuits.
4) Making and recording electrical measurements.
5) Replacing blown fuses.
6) Installing temporary jumpers.
3. Testing laboratory responsibilities:
a. Perform all acceptance tests specified in this Section. b. Provide all required equipment, materials, labor, and technical support during acceptance tests.
1.05 SUBMITTALS
A. General submittal requirements:
1. Furnish submittals as specified in Section 01330 - Submittal Procedures.
B. Copper Ethernet test form:
1. Cable test reports:
a. Submit 3 copies of test reports showing the results of all tests specified in this Section:
1) Test type.
2) Test location.
3) Test date.
Field Electrical Acceptance Tests
16950-5 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16950 (CONFORMED) 4) Cable number.
5) Cable length.
6) Certification that the cable meets or exceeds the specified standard. b. Furnish hard copy and electronic copy for all traces.
C. Manufacturers’ testing procedures:
1. Submit manufacturers’ recommended testing procedures and acceptable test results for review by the Engineer prior to beginning testing.
D. Test report:
1. Include the following:
a. Summary of Project.
b. Description of equipment tested.
c. Description of tests performed.
d. Test results.
e. Conclusions and recommendations.
f. Completed test forms.
g. List of test equipment used and calibration dates.
h. LAN cable test reports.
E. Test data records:
1. Include the following:
a. Identification of the testing organization.
b. Equipment identification.
c. Nameplate data.
d. Humidity, temperature and or other conditions that may affect the results of the tests and or calibrations.
e. Dates of inspections, tests, maintenance and or calibrations. f. Indication of the inspections, tests, maintenance, and or calibrations to be performed and recorded.
g. Expected results when calibrations are to be performed. h. Indication of as-found and as-left results as applicable. i. Indication of all test results outside specified tolerances.
F. Testing laboratory qualifications:
1. Submit a complete resume and statement of qualifications from the proposed testing laboratory detailing their experiences in performing the tests specified:
a. This statement will be used to determine whether the laboratory is acceptable, and shall include:
1) Corporate history and references.
2) Resume of individual performing test.
3) Equipment list and test calibration data.
G. Division of responsibilities:
1. Submit a list identifying who is responsible for performing each portion of the testing.
Field Electrical Acceptance Tests
16950-6 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16950 (CONFORMED)
1.06 QUALITY ASSURANCE
A. Testing laboratory qualifications:
1. The testing laboratory may be qualified testing personnel from the electrical subcontractor’s staff or an independent testing company.
2. NETA certification required.
3. Selection of the testing laboratory and testing personnel is subject to approval by the Engineer based on testing experience and certifications of the individuals and testing capabilities of the organization.
1.07 DELIVERY, STORAGE, AND PROTECTION (NOT USED)
1.08 PROJECT OR SITE CONDITIONS
A. General site and project conditions:
1. As specified in Section 01850 - Design Criteria.
1.09 SEQUENCING
A. Prior to testing:
1. At least 30 days before commencement of the acceptance tests, submit the manufacturer’s complete field testing procedures to the Engineer and to the testing laboratory, complete with expected test results and tolerances for all equipment to be tested.
B. Perform testing in the following sequence:
1. Perform routine tests as the equipment is installed including:
a. Insulation-resistance tests.
b. Continuity tests.
c. Rotational tests.
2. Adjusting and preliminary calibration.
3. Acceptance tests.
4. Demonstration.
5. Commissioning and plant start-up.
1.10 SCHEDULING (NOT USED)
1.11 WARRANTY
A. As specified in Section 01783 - Warranties and Bonds.
1.12 SYSTEM START-UP (NOT USED)
Field Electrical Acceptance Tests
16950-7 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16950 (CONFORMED)
1.13 OWNER'S INSTRUCTIONS (NOT USED)
1.14 MAINTENANCE (NOT USED)
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION
3.01 EXAMINATION (NOT USED)
3.02 PREPARATION
A. Test instrument calibration:
1. Utilize a testing laboratory with a calibration program which maintains all applicable test instrumentation within rated accuracy.
a. The calibrating standard shall be of better accuracy than that of the equipment tested.
2. The accuracy shall be traceable to the NIST in an unbroken chain.
3. Calibrate instruments in accordance with the following frequency schedule:
a. Field instruments: 6 months maximum.
b. Laboratory instruments: 12 months maximum.
c. Leased specialty equipment where the accuracy is guaranteed by the lessor (such as Doble): 12 months maximum.
4. Dated calibration labels shall be visible on all test equipment.
5. Maintain an up-to-date instrument calibration record for each test instrument:
a. The records shall show the date and results of each calibration or test.
6. Maintain an up-to-date instrument calibration instruction and procedure for each test instrument.
B. Requirements prior to testing:
1. Do not begin testing until the following conditions have been met:
a. All instruments required are available and in proper operating condition. b. All required dispensable materials such as solvents, rags, and brushes are available.
c. All equipment handling devices such as cranes, vehicles, chain falls and other lifting equipment are available or scheduled.
d. All instruction books, calibration curves, or other printed material to cover the electrical devices are available.
e. Data sheets to record all test results are available.
3.03 INSTALLATION
A. Test decal:
1. The testing laboratory shall affix a test decal on the exterior of equipment or equipment enclosure of protective devices after performing electrical tests.
Field Electrical Acceptance Tests
16950-8 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16950 (CONFORMED)
2. The test decal shall be color coded to communicate the condition of maintenance of the protective. The color scheme for condition of maintenance of overcurrent protective devices shall be:
a. White: electrically and mechanically acceptable.
b. Yellow; minor deficiency not affecting fault detection and operation, but minor electrical or mechanical condition exists.
3. The decal shall include the following information at a minimum:
a. Testing organization.
b. Project identifier.
c. Test date.
d. Technician identifier.
3.04 ERECTION, INSTALLATION, APPLICATION, CONSTRUCTION (NOT USED)
3.05 REPAIR/RESTORATION (NOT USED)
3.06 RE-INSTALLATION (NOT USED)
3.07 COMMISSIONING
A. General commissioning requirements:
1. As specified in Section 01756 - Commissioning.
B. Testing and Training Phase: Installation Testing:
1. Also called "Field Acceptance Testing".
C. Panelboards:
1. Cleaning:
a. Visually inspect panelboard for evidence of discoloration, abnormal dust accumulation, metal shards, or any other indication of overheating, wear, or other abnormal conditions prior to cleaning.
b. Clean cabinet with a brush, vacuum cleaner, or clean, dry, lint-free rags to remove any accumulation of dust, dirt, or other foreign matter. Do not use liquids, solvents or detergents when cleaning panelboards or components. c. Avoid blowing dust into panelboards. Do not use a blower or compressed air.
d. Clean Supports, terminals, and other major insulating surfaces with clean, dry, lint-free rags or soft bristled brushes.
e. Remove dust, soot, grease, moisture, and foreign material from surface of circuit breakers.
2. General:
a. Compare equipment nameplate data with the Contract Documents. b. Check panelboard circuit schedule for accuracy.
c. Verify appropriate anchorage, required area clearances, and correct alignment.
d. Inspect overall general condition for physical damage. Check for broken studs and loose or damaged wires, connector, terminations, etc. Check all bolts, nuts, washer, and pins for tightness. Tighten or use manufacture’s replacement parts as required.
Field Electrical Acceptance Tests
16950-9 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16950 (CONFORMED) e. Inspect cabinets for signs of rust, corrosion, or deteriorating paint. Inspect cabinets for evidence of localized heat damage to the paint. Investigate sources of heat. Repair painted surfaces.
f. Check that covers are in place and fastened. Plug any open unused knockouts.
g. Inspect panelboard for moisture. Seal off any cracks or openings which have allowed moisture to enter the cabinet. Inspect all component devices. Replace any components that show evidence of damage from moisture.
h. Look for any recent changes in sprinklers or other plumbing that might expose indoor panelboards to a source of liquids. Eliminate sources of water, moisture, or liquids, or provide adequate barriers to protect panelboards from sources of water, moisture, or liquids. i. Inspect panelboards and internal components for evidence of overheating, arc spatter, sooty deposits, and tracking. Investigate and correct sources of arcing or overheating. Consult the panelboard manufacturer for recommendations.
j. Verify that fuse and/or circuit breaker sizes and types correspond to record drawings, if available, as well as to the circuit breaker’s address for microprocessor communications packages, if equipped.
k. Set adjustable circuit breakers in accordance with engineering coordination study supplied by Contractor.
3. Terminations, Connections, and Lugs:
a. Inspect bolted electrical connections for high resistance using one of the following methods:
1) Use of low-resistance ohmmeter.
a) Compare bolted connection resistance values to values of similar connections:
(1) Investigate values which deviate from those of similar bolted connections by more than 50 percent of the lowest value.
2) Verify tightness of accessible bolted electrical connections by the calibrated torque wrench method:
a) Refer to manufacturer’s instructions for proper foot-pound levels or NETA ATS tables.
b. Inspect terminations, connection, and lugs for alignment, physical damage, burns, corrosion, discoloration, flaking, heat damage, arcing, pitting, melting, deterioration, carbonization, cracks, chips, breaks, partial discharge, or moisture. Investigate and eliminate sources of any damage. c. Follow manufacturer recommendations for cleaning, repairing, and replacing damaged parts.
d. Replace overheated connections. Tighten connections to proper torque levels as specified above.
4. Conductors and raceways:
a. Inspect supply conductors and terminations for overheating, discoloration, and oxidation. Investigate and correct any deficiencies. b. Ensure the conductors are protected within their ampacities. c. Visually check panelboard, cables, and raceways for proper bonding and grounding. Correct improper bonding and grounding.
Field Electrical Acceptance Tests
16950-10 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16950 (CONFORMED) d. Inspect conductors for discoloration, arcing, pitting, melting, flaking of insulation and/or metal parts. Repair or replace damaged components in accordance with manufacturer’s recommendations.
e. Inspect for frayed or broken wires. Replace or repair damaged components in accordance with manufacturer recommendations. f. Inspect for frayed or broken wires. Replace or repair conductors as necessary.
g. Inspect conduits for moisture. Seal conduits which are a source of moisture and provide means to drain moisture away from the panelboard.
5. Circuit breakers:
a. Breakers rated less than 100 A:
1) Operate circuit breakers several times in order to exercise the mechanisms and the contacts, and to ensure smooth operation. Do not oil or grease parts of molded case circuit breakers. 2) Visually check circuit breakers for evidence of overheating and thermal damage. Investigate and eliminate sources of overheating. 3) Check circuit breakers for visual defects, chipping, cracks, breaks, burns, and deterioration. Replace damaged circuit breakers. 4) Verify correct operation of any auxiliary features such as trip and pickup indicators, zone interlocking, electrical close and trip operation, trip-free, and antipump function.
5) Inspect interchangeable trip-unit circuit breakers for tightness of trip units.
6) Check circuit breaker terminals and connections for tightness as specified above.
b. Breakers rated 100 A and higher:
1) Perform visual and mechanical inspection as specified in this Section.
2) Perform electrical tests as specified in this Section.
D. Switchgear and switchboard:
1. Visual and mechanical inspection:
a. Compare equipment nameplate data with the Contract Documents. b. Inspect physical and mechanical condition.
c. Inspect anchorage, alignment, grounding and required area clearances. d. Verify the unit is clean and all shipping bracing, loose parts, and documentation shipped inside cubicles have been removed. e. Verify that circuit breaker/fuse sizes and types correspond to the approved submittals and the coordination study as well as to the circuit breakers address for microprocessor-communication packages. f. Verify that current and voltage transformer ratios correspond to those indicated on the Drawings.
g. Verify that wiring connections are tight and that wiring is secure to prevent damage during routine operation of moving parts.
h. Inspect bolted electrical connections for high resistance using one of the following methods:
1) Use of low-resistance ohmmeter.
2) Verify tightness of accessible bolted electrical connections by the calibrated torque wrench method:
a) Refer to manufacturer’s instructions for proper foot-pound levels or NETA ATS tables.
Field Electrical Acceptance Tests
16950-11 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16950 (CONFORMED) i. Verify operation and sequencing of interlocking systems:
1) Attempt closure on locked-open devices.
2) Attempt to open locked-closed devices.
3) Make/attempt key-exchanges in all positions.
j. Verify appropriate lubrication on moving current-carrying parts and on moving and sliding surfaces.
k. Inspect insulators for evidence of physical damage or contaminated surfaces.
l. Verify correct barrier and shutter installation and operation. m. Exercise all active components.
n. Inspect mechanical indicating devices for correct operation. o. Verify that filters are in place and/or vents are clear. p. Perform visual and mechanical inspection of instrument transformers as specified in this Section.
q. Perform visual and mechanical inspection of surge arresters as specified in this Section.
r. Inspect control power transformers:
1) Inspect for physical damage, cracked insulation, broken leads, tightness of connections, defective wiring, and overall general condition.
2) Verify that primary and secondary fuse/circuit breaker ratings match the submittal drawings.
3) Verify correct functioning of drawout disconnecting contacts, grounding contacts, and interlocks.
2. Electrical tests:
a. Perform resistance measurements through bolted connections with a low-resistance ohmmeter.
b. Perform insulation-resistance tests on each bus section, phase-to-phase and phase-to-ground for 1 minute.
1) Perform test in accordance with NETA ATS tables.
c. Perform electrical tests on instrument transformers as specified in this Section.
d. Perform ground-resistance tests:
1) Perform point-to-point tests to determine the resistance between the main grounding system and all major electrical equipment frames, system neutral and derived neutral points.
e. Test metering devices as specified in this Section.
f. Control power transformers:
1) Perform insulation-resistance tests. Perform measurements from winding-to-winding and each winding-to-ground:
a) Test voltages shall be in accordance with NETA ATS tables or as specified by the manufacturer.
b) Perform a turns-ratio test on all tap positions.
2) Perform secondary wiring integrity test:
a) Disconnect transformer at secondary terminals and connect secondary wiring to a rated secondary voltage source:
(1) Verify correct potential at all devices.
3) Verify correct secondary voltage by energizing primary winding with system voltage:
a) Measure secondary voltage with the secondary wiring
disconnected.
Field Electrical Acceptance Tests
16950-12 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16950 (CONFORMED) g. Perform current injection tests on the entire current circuit of each switchgear or switchboard:
1) Perform current tests by secondary injection with magnitudes such that a minimum current of 1.0 ampere flows in the secondary circuit:
a) Verify the correct magnitude of current at each device in the circuit.
h. Perform system function tests.
i. Verify operation of space heaters.
j. Perform electrical tests of surge arresters as specified in this Section.
3. Test values:
a. Compare bolted connection resistance values to values of similar connections:
1) Investigate values which deviate from those of similar bolted connections by more than 50 percent of the lowest value. b. Bolt-torque levels shall be in accordance with manufacturer’s published data:
1) Refer to NETA ATS tables in the absence of manufacturer’s published data.
c. Insulation-resistance values of bus insulation shall be in accordance with manufacturer’s published data:
1) Refer to NETA ATS tables in the absence of manufacturer’s published data.
2) Investigate insulation values less than the allowable minimum. 3) Do not proceed with dielectric withstand voltage tests until insulation-resistance values are above minimum values.
d. If no evidence of distress or insulation failure is observed by the end of the total time of voltage application during the dielectric withstand test, the test specimen is considered to have passed the test.
e. Instrument transformer test values shall be as specified in this Section. f. Meter test values shall be as specified in this Section. g. Investigate grounding system point-to-point resistance values that exceed
0.5 ohm.
h. Control power transformers:
1) Insulation-resistance values of control power transformers shall be in accordance with manufacturer’s published data:
a) Refer to NETA ATS tables in the absence of manufacturer’s published data.
b) Investigate insulation values less than the allowable minimum. 2) Turns-ratio test results shall not deviate by more than 1/2 percent from either the adjacent coils or the calculated ratio. a) Do not proceed with dielectric withstand voltage tests until insulation-resistance values are above minimum values.
3) Secondary wiring shall be as indicated on the Drawings and specified in the Specifications.
4) Secondary voltage shall be as indicated on the Drawings. i. Current-injection tests shall prove current wiring is as indicated on the Drawings and specified in the Specifications.
j. Results of system function tests shall match the drawings and Specifications.
k. Heaters shall be operational.
Field Electrical Acceptance Tests
16950-13 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16950 (CONFORMED) l. Phasing checks shall prove the switchgear or switchboard phasing is correct and in accordance with the system design.
m. Results of electrical tests on surge arresters shall be as specified in this Section.
E. Dry type transformers:
1. Visual and mechanical inspection:
a. Compare equipment nameplate data with the Contract Documents. b. Inspect physical and mechanical condition.
c. Inspect anchorage, alignment, and grounding.
d. Verify that resilient mounts are free and that any shipping brackets have been removed.
e. Inspect equipment for cleanliness.
f. Inspect bolted electrical connections for high resistance using one of the following methods:
1) Use of low-resistance ohmmeter.
2) Verify tightness of accessible bolted electrical connections by the calibrated torque wrench method:
a) Refer to manufacturer’s instructions for proper foot-pound levels or NETA ATS tables.
g. Verify that as-left tap connections are as specified.
2. Electrical tests:
a. Perform resistance measurements through bolted connections with a low-resistance ohmmeter.
b. Perform insulation-resistance tests winding-to-winding and each winding-to-ground:
1) Apply voltage in accordance with manufacturer’s published data. a) Refer to NETA ATS tables in the absence of manufacturer’s published data.
c. Calculate dielectric absorption ration or polarization index. d. Verify correct secondary voltage, phase-to-phase and phase-to-neutral after energization and before loading.
3. Test values:
a. Compare bolted connection resistance values to values of similar connections:
1) Investigate values which deviate from those of similar bolted connections by more than 50 percent of the lowest value. b. Bolt-torque levels shall be in accordance with manufacturer’s published data:
1) Refer to NETA ATS tables in the absence of manufacturer’s published data.
c. Tap connections are left as found unless otherwise specified. d. Minimum insulation-resistance values of transformer insulation shall be in accordance with manufacturer’s published data:
1) Refer to NETA ATS tables in the absence of manufacturer’s published data.
2) Investigate insulation values less than the allowable minimum. e. The dielectric absorption ratio or polarization index shall not be less than
1.0.
Field Electrical Acceptance Tests
16950-14 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16950 (CONFORMED) f. Turns-ratio results should not deviate more than 1/2 percent from either the adjacent coils or calculated ratio.
g. Phase-to-phase and phase-to-neutral secondary voltages shall be in agreement with nameplate data.
F. Low voltage cables, 600 volt maximum:
1. Visual and mechanical inspection:
a. Compare cable data with the Drawings and Specifications. b. Inspect exposed sections of cable for physical damage and correct connection as indicated on the Drawings.
c. Inspect bolted electrical connections for high resistance by one of the following methods:
1) Use of low-resistance ohmmeter.
2) Verify tightness of accessible bolted electrical connections by the calibrated torque wrench method:
a) Refer to manufacturer’s instructions for proper foot-pound levels or NETA ATS tables.
d. Inspect compression applied connectors for correct cable match and indentation.
e. Inspect for correct identification and arrangement.
f. Inspect cable jacket insulation and condition.
2. Electrical tests:
a. Perform resistance measurements through bolted connections with a low-resistance ohmmeter.
b. Perform insulation resistance test on each conductor sized No. 8 AWG or larger with respect to ground and adjacent conductors:
1) Applied potential shall be 500 volts dc for 300 volt rated cable and 1,000 volts dc for 600 volt rated cable.
2) Test duration shall be 1 minute.
c. Perform continuity tests on all power and control conductors to insure correct cable connection.
d. Verify uniform resistance of parallel conductors.
3. Test values:
a. Compare bolted connection resistance values to values of similar connections:
1) Investigate values which deviate from those of similar bolted connections by more than 50 percent of the lowest value. b. Insulation-resistance values shall be in accordance with manufacturer’s published data:
1) Refer to NETA ATS tables in the absence of manufacturer’s published data.
2) Investigate values of insulation-resistance less than the allowable minimum.
c. Cable shall exhibit continuity.
d. Deviations in resistance between parallel conductors shall be investigated.
G. Low voltage molded case and insulated case circuit breakers:
1. Visual and mechanical inspection:
a. Compare equipment nameplate data with the Contract Documents. b. Inspect physical and mechanical condition.
Field Electrical Acceptance Tests
16950-15 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16950 (CONFORMED) c. Inspect anchorage and alignment.
d. Verify the unit is clean.
e. Operate the circuit breaker to ensure smooth operation. f. Inspect bolted electrical connections for high resistance by one of the following methods:
1) Use of low-resistance ohmmeter.
2) Verify tightness of accessible bolted electrical connections by the calibrated torque wrench method:
a) Refer to manufacturer’s instructions for proper foot-pound levels or NETA ATS tables.
g. Perform adjustments for final protective device settings in accordance with the coordination study.
2. Electrical tests:
a. Perform resistance measurements through bolted connections with a low-resistance ohmmeter.
b. Perform insulation-resistance tests for 1 minute on each pole, phase-to-phase and phase-to-ground with the circuit breaker closed and across each open pole:
1) Apply voltage in accordance with manufacturer’s published data. 2) Refer to NETA ATS tables in the absence of manufacturer’s published data.
c. Perform a contact/pole-resistance test.
d. Determine long-time pickup and delay by primary current injection. e. Determine short-time pickup and delay by primary current injection. f. Determine ground-fault pickup and delay by primary current injection. g. Determine instantaneous pickup value by primary current injection. h. Perform minimum pickup voltage tests on shunt trip and close coils in accordance with manufacturer’s published data.
i. Verify correct operation of any auxiliary features such as trip and pickup indicators, zone interlocking, electrical close and trip operation, trip-free, anti-pump function and trip unit battery condition:
1) Reset all trip logs and indicators.
j. Verify operation of charging mechanism.
3. Test values:
a. Compare bolted connection resistance values to values of similar connections:
1) Investigate values which deviate from those of similar bolted connections by more than 50 percent of the lowest value. b. Bolt-torque levels shall be in accordance with manufacturer’s published data:
1) Refer to NETA ATS tables in the absence of manufacturer’s published data.
c. Insulation-resistance values shall be in accordance with manufacturer’s published data:
1) Refer to NETA ATS tables in the absence of manufacturer’s published data.
2) Investigate values of insulation-resistance less than the allowable minimum.
Field Electrical Acceptance Tests
16950-16 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16950 (CONFORMED) d. Microhm or dc millivolt drop values shall not exceed the high levels of the normal range as indicated in the manufacturer’s published data:
1) If manufacturer’s data is not available, investigate any values which deviate from adjacent poles or similar breakers by more than 50 percent of the lowest value.
e. Long-time pickup values shall be as specified, and the trip characteristic shall not exceed manufacturer’s published time-current characteristic tolerance band including adjustment factors:
1) If manufacturer’s curves are not available, trip times shall not exceed the value shown in NETA ATS tables.
f. Short-time pickup values shall be as specified, and the trip characteristic shall not exceed manufacturer’s published time-current tolerance band. g. Ground fault pickup values shall be as specified, and the trip characteristic shall not exceed manufacturer’s published time-current tolerance band. h. Instantaneous pickup values shall be as specified and within manufacturer’s published tolerances:
1) Refer to NETA ATS tables in the absence of manufacturer’s published data.
i. Pickup values and trip characteristics shall be within manufacturer’s published tolerances.
j. Determine energy reducing maintenance switch pickup value by primary current injection.
k. Breaker open, close, trip, trip-free, anti-pump, and auxiliary features shall function as designed.
l. The charging mechanism shall operate in accordance with manufacturer’s published data.
H. Instrument transformers - current transformers:
1. Visual and mechanical inspection:
a. Compare equipment nameplate data with the Contract Documents. b. Inspect physical and mechanical condition.
c. Verify correct connection of transformers with system requirements. d. Verify that adequate clearances exist between primary and secondary circuit wiring.
e. Verify the unit is clean.
f. Inspect bolted electrical connections for high resistance using one of the following methods:
1) Use of low-resistance ohmmeter.
2) Verify tightness of accessible bolted electrical connections by calibrated torque wrench method:
a) Refer to manufacturer’s instructions for proper foot-pound levels or NETA ATS tables.
g. Verify that all required grounding and shorting connections provide contact.
h. Verify appropriate lubrication on moving current-carrying parts and on moving and sliding surfaces.
2. Electrical tests:
a. Perform resistance measurements through bolted connections with a low-resistance ohmmeter.
Field Electrical Acceptance Tests
16950-17 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16950 (CONFORMED) b. Perform insulation-resistance test of each current transformer and its secondary wiring with respect to ground at 1,000 VDC for 1 minute:
1) For solid state devices that cannot tolerate the applied voltage, follow the manufacturer’s recommendation.
c. Perform a polarity test of each current transformer in accordance with IEEE C57.13.1.
d. Perform a ratio verification test using the voltage or current method in accordance with IEEE C57.13.1.
e. Perform an excitation test on current transformers used for relaying applications in with accordance with IEEE C57.13.1.
f. Measure current circuit burdens at transformer terminals in accordance with IEEE C57.13.1.
g. When applicable perform insulation-resistance tests on the primary winding with the secondary grounded:
1) Test voltages shall be in accordance with NETA ATS tables. h. Perform power-factor or dissipation-factor tests in accordance with test equipment manufacturer’s published data.
i. Verify that current transformer secondary circuits are grounded and have only 1 grounding point in accordance with IEEE C57.13.3:
1) That grounding point should be located as specified by the Engineer in the Contract Documents.
3. Test values:
a. Compare bolted connection resistance values to values of similar connections:
1) Investigate values which deviate from those of similar bolted connections by more than 50 percent of the lowest value. b. Bolt-torque levels shall be in accordance with manufacturer’s published data:
1) Refer to NETA ATS tables in the absence of manufacturer’s published data.
c. Insulation-resistance values of instrument transformers shall be in accordance with manufacturer’s published data:
1) Refer to NETA ATS tables in the absence of manufacturer’s published data.
d. Polarity results shall agree with transformer markings. e. Ratio errors shall be in accordance with IEEE C57.13. f. Excitation results for current transformers shall match the curve supplied by the manufacturer or be in accordance with IEEE C57.13.1. g. Measured burdens shall be compared to instrument transformer ratings. h. If no evidence of distress or insulation failure is observed by the end of the total time of voltage application during the dielectric withstand test, the primary winding is considered to have passed the test.
i. Power-factor or dissipation-factor values shall be compared to manufacturer’s published data:
1) In the absence manufacturer’s published data, use the test equipment manufacturer's published data.
j. Test results shall indicate that the circuits have only 1 grounding point.
Field Electrical Acceptance Tests
16950-18 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16950 (CONFORMED) I. Instrument transformers - voltage transformers:
1. Visual and mechanical inspection:
a. Compare equipment nameplate data with the Contract Documents. b. Inspect physical and mechanical condition.
c. Verify correct connection of transformers with system requirements. d. Verify that adequate clearances exist between primary and secondary circuit wiring.
e. Verify the unit is clean.
f. Inspect bolted electrical connections for high resistance using one of the following methods:
1) Use of low-resistance ohmmeter.
2) Verify tightness of accessible bolted electrical connections by calibrated torque wrench method:
a) Refer to manufacturer’s instructions for proper foot-pound levels or NETA ATS tables.
g. Verify that all required grounding and connections provide contact. h. Verify correct primary and secondary fuse sizes for voltage transformers. i. Verify appropriate lubrication on moving current-carrying parts and on moving and sliding surfaces.
j. Perform as-left tests.
2. Electrical tests - voltage transformers:
a. Perform resistance measurements through bolted connections with a low-resistance ohmmeter.
b. Perform insulation-resistance tests winding-to-winding and winding-to-ground:
1) Test voltage shall be applied for 1 minute in accordance with NETA ATS requirements.
2) For solid state devices that cannot tolerate the applied voltage, follow the manufacturer’s recommendation.
c. Perform a polarity test on each voltage transformer to verify the polarity marks on H1- X1 relationship as applicable.
d. Perform a turns ratio test on all tap positions.
e. Measure voltage circuit burdens at transformer terminals. f. Perform a dielectric withstand test on the primary windings with the secondary windings grounded:
1) The dielectric voltage shall be in accordance with NETA ATS tables. 2) Apply the test voltage for 1 minute.
g. Perform power-factor or dissipation-factor tests in accordance with test equipment manufacturers published data.
h. Verify that voltage transformer secondary circuits are grounded and have only 1 grounding point in accordance with IEEE C57.13.3:
1) That grounding point should be located as specified by the Engineer in the Contract Documents.
3. Test values:
a. Compare bolted connection resistance values to values of similar connections:
1) Investigate values which deviate from those of similar bolted connections by more than 50 percent of the lowest value.
Field Electrical Acceptance Tests
16950-19 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16950 (CONFORMED) b. Bolt-torque levels shall be in accordance with manufacturer’s published data:
1) Refer to NETA ATS tables in the absence of manufacturer’s published data.
c. Insulation-resistance values of instrument transformers shall be in accordance with manufacturer’s published data:
1) Refer to NETA ATS tables in the absence of manufacturer’s published data.
d. Polarity results shall agree with transformer markings. e. Ratio errors shall be in accordance with IEEE C57.13. f. Measured burdens shall be compared to instrument transformer ratings. g. If no evidence of distress or insulation failure is observed by the end of the total time of voltage application during the dielectric withstand test, the primary winding is considered to have passed the test.
h. Power-factor or dissipation-factor values shall be compared to manufacturer’s published data:
1) In the absence manufacturer’s published data, use the test equipment manufacturer's published data.
i. Test results shall indicate that the circuits have only 1 grounding point.
J. Metering devices, microprocessor based:
1. Visual and mechanical inspection:
a. Compare equipment nameplate data with the Contract Documents. b. Inspect meters and cases for physical damage.
c. Clean front panel.
d. Verify tightness of electrical connections.
e. Record the following:
1) Model number.
2) Serial number.
3) Firmware revision.
4) Software revision.
5) Rated control voltage.
f. Verify operation of display and indicating devices.
g. Record passwords.
h. Verify the unit is grounded in accordance with the manufacturer's instructions.
i. Set all required parameters including instrument transformer ratios, system type, frequency, power demand methods/intervals, and communications requirements.
2. Electrical tests:
a. Apply voltage or current as appropriate to each analog input and verify correct measurement and indication.
b. Confirm correct operation and setting of each auxiliary input/output feature including mechanical relay, digital and analog.
c. After initial system energization, confirm measurements and indications are consistent with loads present.
3. Test values:
a. Nameplate data shall match the Contract Documents.
b. Tightness of electrical connections shall ensure a low resistance connection.
Field Electrical Acceptance Tests
16950-20 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16950 (CONFORMED) c. Display and indicating devices shall operate per manufacturer's published data.
d. Measurement and indication of applied voltages and currents shall be within the manufacturer's published tolerances for accuracy. e. All auxiliary input/output features shall operate per settings and manufacturer's published data.
f. Measure and indications shall be consistent with energized system loads.
K. Metering devices electromechanical and solid state:
1. Visual and mechanical inspection:
a. Compare equipment nameplate data with the Contract Documents. b. Inspect physical and mechanical condition.
c. Inspect bolted electrical connections for high resistance using one of the following methods:
1) Use of low-resistance ohmmeter.
2) Verify tightness of accessible bolted electrical connections by calibrated torque wrench method:
a) Refer to manufacturer’s instructions for proper foot-pound levels or NETA ATS tables.
d. Record model number, serial number, firmware revision, software revision, and rated control voltage.
e. Verify operation of display and indicating devices.
f. Record passwords.
g. Verify unit is grounded in accordance with manufacturer’s instructions. h. Set all required parameters including instrument transformer ratios, system type, frequency, power demand methods/intervals, and communications requirements.
i. Inspect cover gasket, cover glass, condition of spiral spring, disk clearance, contacts, and case shorting contacts as applicable. j. Verify the unit is clean.
2. Electrical tests:
a. Apply voltage or current as appropriate to each analog input and verify correct measurement and indication.
b. Confirm correct operation and setting of each auxiliary input/output feature including mechanical relay, digital, and analog.
c. After initial system energization, confirm measurements and indications are consistent with loads present.
d. Perform resistance measurements through bolted connections with a low-resistance ohmmeter.
e. Verify accuracy of meter at all cardinal points.
f. Calibrate meters in accordance with manufacturer’s published data. g. Verify that current transformer, and voltage transformer secondary circuits are intact.
3. Test values:
a. Compare bolted connection resistance values to values of similar connections:
1) Investigate values which deviate from those of similar bolted connections by more than 50 percent of the lowest value.
Field Electrical Acceptance Tests
16950-21 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16950 (CONFORMED) b. Bolt-torque levels shall be in accordance with manufacturer’s published data:
1) Refer to NETA ATS tables in the absence of manufacturer’s published data.
c. Meter accuracy shall be in accordance with manufacturer’s published data.
d. Calibration results shall be within manufacturer’s published tolerances. e. Instrument multipliers shall be in accordance with system design specifications.
f. Test results shall confirm the integrity of the secondary circuits of current and voltage transformers.
L. Grounding systems:
1. Visual and mechanical inspection:
a. Inspect ground system for compliance with the Contract Documents, and the NEC.
b. Inspect physical and mechanical condition.
c. Inspect bolted electrical connections for high resistance using one of the following methods:
1) Use of low-resistance ohmmeter.
2) Verify tightness of accessible bolted electrical connections by calibrated torque wrench method:
a) Refer to manufacturer’s instructions for proper foot-pound levels or NETA ATS tables.
d. Inspect anchorage.
2. Electrical tests:
a. Perform resistance measurements through bolted connections with a low-resistance ohmmeter.
b. Perform fall of potential test or alternative test in accordance with IEEE 81 on the main grounding electrode or system.
c. Perform point-to-point tests to determine the resistance between the main grounding system and all major electrical equipment frames, the system neutral and any derived neutral points.
3. Test values:
a. Grounding system electrical and mechanical connections shall be free of corrosion.
b. Compare bolted connection resistance values to values of similar connections:
1) Investigate values which deviate from those of similar bolted connections by more than 50 percent of the lowest value. c. Bolt-torque levels shall be in accordance with manufacturer’s published data:
1) Refer to NETA ATS tables in the absence of manufacturer’s published data.
d. The resistance between the main grounding electrode and ground shall be as specified in Section 16060 - Grounding and Bonding. e. Investigate point-to-point resistance values that exceed 0.5 ohm.
M. Rotating machinery, ac induction motors and generators:
1. Visual and mechanical inspection:
a. Compare equipment nameplate information with the Contract Documents.
Field Electrical Acceptance Tests
16950-22 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16950 (CONFORMED) b. Inspect physical and mechanical condition.
c. Inspect anchorage, alignment, and grounding.
d. Inspect air baffles, filter media, cooling fans, slip rings, brushes, and brush rigging.
e. Inspect bolted electrical connections for high resistance using one or more of the following methods:
1) Use of low-resistance ohmmeter.
2) Verify tightness of accessible bolted electrical connections by calibrated torque wrench method:
a) Refer to manufacturer’s instructions for proper foot-pound levels or NETA ATS tables.
f. Manually rotate the rotor and check for problems with the bearings or shaft.
g. Rotating equipment:
1) Operate at rated design load conditions.
2) Confirm that equipment is properly assembled.
3) Confirm the equipment moves or rotates in the proper direction. 4) Confirm shafting, drive elements, and bearings are installed and lubricated in accordance with proper tolerances.
5) Confirm that no unusual power consumption, lubrication temperatures, bearing temperatures, or other conditions are observed.
h. Verify correct application of appropriate lubrication and lubrication systems.
i. Verify that resistance temperature detector (RTD) circuits conform to that indicated on the Drawings.
2. Electrical tests - AC Induction:
a. Perform resistance measurements through bolted connections with a low-resistance ohmmeter.
b. Perform insulation-resistance test in accordance with IEEE 43:
1) On motors 200 horsepower and smaller, test duration shall be 1 minute. Calculate dielectric absorption ratio for 60/30 second periods.
c. Perform insulation-resistance test on insulated bearings in accordance with manufacturer’s published data.
d. Test surge protection devices as specified in this Section. e. Test motor starter as specified in this Section.
f. Perform resistance tests on resistance temperature detector (RTD) circuits.
g. Verify operation of motor space heater, if applicable.
3. Test values:
a. Inspection:
1) Air baffles shall be clean and installed in accordance with the manufacturer’s published data.
2) Filter media shall be clean and installed in accordance with the manufacturer’s published data.
3) Cooling fans shall operate.
4) Slip ring alignment shall be within manufacturer’s published tolerances.
5) Brush alignment shall be within manufacturer’s published tolerances. 6) Brush rigging shall be within manufacturer’s published tolerances.
Field Electrical Acceptance Tests
16950-23 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16950 (CONFORMED) b. Compare bolted connection resistance values to values of similar connections:
1) Investigate values which deviate from those of similar bolted connections by more than 50 percent of the lowest value. c. Bolt-torque levels shall be in accordance with manufacturer’s published data:
1) Refer to NETA ATS tables in the absence of manufacturer’s published data.
d. Airgap spacing and machine alignment shall be in accordance with manufacturer’s published data.
e. The recommended minimum insulation-resistance (IR1 min) test results in megohms shall be in accordance with NETA ATS tables.
1) The polarization index value shall not be less than 2.0. 2) The dielectric absorption ratio shall not be less than 1.4. f. If no evidence of distress or insulation failure is observed by the end of the total time of voltage application during the dielectric withstand test, the test specimen is considered to have passed the test.
g. Investigate phase-to-phase stator resistance values that deviate by more than 5 percent.
h. Power factor or dissipation factor values shall be compared to manufacturer’s published data:
1) In the absence of manufacturer’s published data, compare values of similar machines.
i. Tip-up values shall indicate no significant increase in power factor. j. If no evidence of distress, insulation failure, or waveform nesting is observed by the end of the total time of voltage application during the surge comparison test, the test specimen is considered to have passed the test.
k. Bearing insulation-resistance measurements shall be within manufacturer’s published tolerances:
1) In the absence of manufacturer’s published data, compare values of similar machines.
l. Test results of surge protection devices shall be as specified in this Section.
m. Test results of motor starter equipment shall be as specified in this Section.
n. RTD circuits shall conform to the design intent and machine protection device manufacturer’s published data.
o. Heaters shall be operational.
p. Vibration amplitudes of the uncoupled and unloaded machine shall be in accordance with manufacturer’s published data:
1) In the absence of manufacturer’s published data, vibration amplitudes shall not exceed values in NETA ATS tables.
2) If values exceed those in the NETA ATS tables, perform a complete vibration analysis.
N. Motor starters, low voltage:
1. Visual and mechanical inspection:
a. Compare equipment nameplate information with the Contract Documents. b. Inspect physical and mechanical condition.
c. Inspect anchorage, alignment, and grounding.
Field Electrical Acceptance Tests
16950-24 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16950 (CONFORMED) d. Verify the unit is clean.
e. Inspect contactors:
1) Verify mechanical operation.
2) Verify contact gap, wipe, alignment, and pressure is in accordance with manufacturer’s published data.
f. Motor-running protection:
1) Verify overload element rating/motor protection settings are correct for its application.
2) If motor running protection is provided by fuses, verify correct fuse rating.
g. Inspect bolted electrical connections for high resistance using one of the following methods:
1) Use of low-resistance ohmmeter.
2) Verify tightness of accessible bolted electrical connections by calibrated torque wrench method:
a) Refer to manufacturer’s instructions for proper foot-pound levels or NETA ATS tables.
h. Lubrication requirements:
1) Verify appropriate lubrication on moving current-carrying parts. 2) Verify appropriate lubrication on moving and sliding surfaces.
2. Electrical tests:
a. Perform resistance measurements through bolted connections with a low-resistance ohmmeter.
b. Perform insulation-resistance tests for 1 minute on each pole, phase-to-phase and phase to ground with the starter closed, and across each open pole for 1 minute:
1) Test voltage shall be in accordance with manufacturer’s published data.
2) Refer to NETA ATS tables in the absence of manufacturer’s published data.
c. Test motor protection devices in accordance with manufacturer’s published data.
d. Test circuit breakers as specified in this Section.
e. Perform operational tests by initiating control devices.
3. Test values:
a. Compare bolted connection resistance values to values of similar connections:
1) Investigate values which deviate from those of similar bolted connections by more than 50 percent of the lowest value. b. Bolt-torque levels shall be in accordance with manufacturer’s published data:
1) Refer to NETA ATS tables in the absence of manufacturer’s published data.
c. Insulation-resistance values shall be in accordance with manufacturer’s published data:
1) Refer to NETA ATS tables in the absence of manufacturer’s published data.
2) Investigate values of insulation-resistance less than the allowable minimum.
Field Electrical Acceptance Tests
16950-25 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16950 (CONFORMED) d. Motor protection parameters shall be in accordance with manufacturer’s published data.
e. Circuit breaker test results shall as be specified in this Section. f. Control devices shall perform in accordance with system design requirements.
O. Variable frequency drive systems:
1. Visual and mechanical inspection:
a. Compare equipment nameplate data with the Contract Documents. b. Inspect physical and mechanical condition.
c. Inspect anchorage, alignment, and grounding.
d. Verify the unit is clean.
e. Ensure vent path openings are free from debris and that heat transfer surfaces are clean.
f. Verify correct connections of circuit boards, wiring, disconnects, and ribbon cables.
g. Motor running protection:
1) Verify drive overcurrent setpoints are correct for their application. 2) If drive is used to operate multiple motors, verify individual overload element ratings are correct for their application.
3) Apply minimum and maximum speed setpoints. Verify setpoints are within limitations of the load coupled to the motor.
h. Inspect bolted electrical connections for high resistance using one of the following methods:
1) Use of low-resistance ohmmeter.
2) Verify tightness of accessible bolted electrical connections by the calibrated torque wrench method:
a) Refer to manufacturer’s instructions for proper foot-pound levels or NETA ATS tables.
i. Verify correct fuse sizing in accordance with manufacturer’s published data.
j. Perform visual and mechanical inspection of input circuit breaker as specified in this Section.
2. Electrical tests:
a. Perform resistance measurements through bolted connections with low resistance ohmmeter.
b. Test the motor overload relay elements by injecting primary current through the overload circuit and monitoring trip time of the overload element.
c. Test for the following parameters in accordance with relay calibration procedures specified in NETA ATS or as recommended by the manufacturer:
1) Input phase loss protection.
2) Input overvoltage protection.
3) Output phase rotation.
4) Overtemperature protection.
5) Direct current overvoltage protection.
6) Overfrequency protection.
7) Drive overload protection.
8) Fault alarm outputs.
Field Electrical Acceptance Tests
16950-26 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16950 (CONFORMED) d. Harmonic distortion measurements for both voltage and current is within the specification limits at the installed site.
e. Peak voltage at the motor terminations is less than 90 percent of the motor insulation dielectric withstand level.
f. Perform continuity tests on bonding conductors as specified in accordance with NETA ATS.
g. Perform start-up of drive in accordance with manufacturer’s published data. Calibrate drive to the system’s minimum and maximum speed control signals.
h. Perform operational tests by initiating control devices:
1) Slowly vary drive speed between minimum and maximum. Observe motor and load for unusual noise or vibration.
2) Verify operation of drive from remote start/stop and speed control signals.
i. Perform electrical tests of input circuit breaker as specified in this Section. j. Measure fuse resistance.
3. Test values:
a. Compare bolted connection resistance values to values of similar connections:
1) Investigate values which deviate from those of similar bolted connections by more than 50 percent of the lowest value. b. Bolt-torque levels shall be in accordance with manufacturer’s published data:
1) Refer to NETA ATS tables in the absence of manufacturer’s published data.
c. Overload test trip times at 300 percent of overload element rating shall be in accordance with manufacturer’s published time-current curve. d. Test values for input circuit breaker shall be as specified in this Section. e. Relay calibration results shall be as specified in this Section. f. Continuity of bonding conductors shall be in accordance with NETA ATS. g. Control devices shall perform in accordance with system requirements. h. Operational tests shall conform to system design requirements. i. Investigate fuse resistance values that deviate from each other by more than 15 percent.
P. Surge arresters, low-voltage:
1. Visual and mechanical inspection:
a. Compare equipment nameplate data with the Contract Documents. b. Inspect physical and mechanical condition.
c. Inspect anchorage, alignment, grounding, and clearances. d. Verify the arresters are clean.
e. Inspect bolted electrical connections for high resistance using one of the following methods:
1) Use of low-resistance ohmmeter.
2) Verify tightness of accessible bolted electrical connections by the calibrated torque wrench method:
a) Refer to manufacturer’s instructions for proper foot-pound levels or NETA ATS tables.
f. Verify that the ground lead on each device is individually attached to a ground bus or ground electrode.
Field Electrical Acceptance Tests
16950-27 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16950 (CONFORMED) g. Verify that stroke counter is correctly mounted and electrically connected, if applicable.
h. Record stroke counter reading.
2. Electrical tests:
a. Perform resistance measurements through bolted connections with a low-resistance ohmmeter.
b. Perform an insulation-resistance test on each arrester, phase terminal-to-ground:
1) Apply voltage in accordance with manufacturers published data. 2) Refer to NETA ATS tables in the absence of manufacturer’s published data.
c. Test grounding connection as specified in this Section.
3. Test values:
a. Compare bolted connection resistance values to values of similar connections:
1) Investigate values which deviate from those of similar bolted connections by more than 50 percent of the lowest value. b. Bolt-torque levels shall be in accordance with manufacturer’s published data:
1) Refer to NETA ATS tables in the absence of manufacturer’s published data.
c. Insulation-resistance values shall be in accordance with manufacturer’s published data:
1) Refer to NETA ATS tables in the absence of manufacturer’s published data.
2) Investigate insulation values less than the allowable minimum. d. Resistance between the arrester ground terminal and the ground system shall be less than 0.5 ohm.
Q. Switches, air, medium-voltage, metal-enclosed:
1. Visual and mechanical inspection:
a. Compare equipment nameplate data with the Contract Documents. b. Inspect physical and mechanical condition.
c. Inspect anchorage, alignment, grounding, and required clearances. d. Verify the unit is clean.
e. Verify correct blade alignment, blade penetration, travel stops, arc interrupter operation, and mechanical operation.
f. Verify that fuse sizes and types are as indicated on the Drawings, short-circuit study, and coordination study.
g. Verify that expulsion-limiting devices are in place on all holders having expulsion-type elements.
h. Verify that each fuseholder has adequate mechanical support and contact integrity.
i. Inspect bolted electrical connections for high resistance using one of the following methods:
1) Use of a low resistance ohmmeter.
2) Verify tightness of accessible bolted electrical connections by calibrated torque wrench method:
a) Refer to manufacturer’s instructions for proper foot-pound levels or NETA ATS tables.
j. Verify operation and sequencing of interlocking systems.
Field Electrical Acceptance Tests
16950-28 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16950 (CONFORMED) k. Verify correct phase barrier installation.
l. Verify correct operation of all indicating and control devices. m. Verify appropriate lubrication on moving current-carrying parts and on moving and sliding surfaces.
2. Electrical tests:
a. Perform resistance measurements through bolted connections with a low-resistance ohmmeter.
b. Measure contact resistance across each switchblade and fuseholder. c. Perform insulation-resistance tests for 1 minute on each pole, phase-to-phase and phase-to ground with switch closed, and across each open pole. Apply voltage in accordance with manufacturer’s published data:
1) In the absence of manufacturer’s published data, use NETA ATS requirements.
d. Perform a dielectric withstand voltage test on each pole with switch closed. Test each pole-to-ground with all other poles grounded. Test voltage shall be in accordance with manufacturer’s published data:
1) In the absence of manufacturer’s published data, use NETA ATS requirements.
e. Measure fuse resistance.
f. Verify cubicle space heater operation.
3. Test values:
a. Compare bolted connection resistance values to values of similar connections:
1) Investigate values which deviate from those of similar bolted connections by more than 50 percent of the lowest value. b. Bolt-torque levels shall be in accordance with manufacturer’s published data:
1) Refer to NETA ATS tables in the absence of manufacturer’s published data.
4. Test values - electrical:
a. Compare bolted connection resistance values to values of similar connections:
1) Investigate values which deviate from those of similar bolted connections by more than 50 percent of the lowest value. b. Microhm or dc millivolt drop values shall not exceed the high levels of the normal range as indicated in the manufacturer’s published data. 1) If manufacturer’s published data is not available, investigate values which deviate from those of similar bus connections and sections by more than 50 percent of the lowest value.
c. Insulation-resistance values shall be in accordance with manufacturer’s published data:
1) Refer to NETA ATS tables in the absence of manufacturer’s published data.
2) Investigate insulation values less than the allowable minimum. 3) Do not proceed with dielectric withstand voltage tests until insulation-resistance values are above minimum values.
d. If no evidence of distress or insulation failure is observed by the end of the total time of voltage application during the dielectric withstand test, the test specimen is considered to have passed the test.
Field Electrical Acceptance Tests
16950-29 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16950 (CONFORMED) e. Investigate fuse resistance values that deviate from each other by more than 15 percent.
f. Heaters shall be operational.
R. Fiber-optic cables:
1. Visual and mechanical inspection:
a. Compare cable, connector, and splice data with the Contract Documents. b. Inspect cable and connections for physical and mechanical damage. c. Verify that all connectors and splices are correctly installed.
2. Optical tests:
a. Perform cable length measurement, fiber fracture inspection, and construction defect inspection using an optical time domain reflectometer (OTDR):
1) OTDR test performed on fiber cables less than 100 meters shall be performed with the aid of a launch cable.
2) Adjust OTDR pulse width settings to a maximum setting of 1/1,000th of the cable length or 10 nanoseconds.
b. Perform connector and splice integrity test using an optical time domain reflectometer.
c. Perform cable attenuation loss measurement with an optical power loss test set:
1) Perform attenuation tests with an Optical Loss Test Set capable and calibrated to show anomalies of 0.1 dB as a minimum.
2) Test multimode fibers at 850 nanometer and 1,300 nanometer. 3) Test single mode fibers at 1,310 nanometer and 1,550 nanometer. d. Perform connector and splice attenuation loss measurement from both ends of the optical cable with an optical power loss test set:
1) At the conclusion of all outdoor splices at 1 location, and before they are enclosed and sealed, all splices shall be tested with OTDR at the optimal wavelengths (850 and 1,300 for multimode, 1,310 and 1,550 for single mode), in both directions. The splices shall be tested for integrity as well as attenuation.
e. Perform fiber links integrity and attenuation tests using each link shall be an OTDR and an Optical Loss Test Set:
1) OTDR traces shall be from both directions on each fiber at the 2 optimal wavelengths, 850 nanometer, and 1,300 nanometer for multimode fibers.
2) Optical loss testing shall be done with handheld test sets in 1 direction at the 2 optimal wavelengths for the appropriate fiber type.
Test equipment shall equal or exceed the accuracy and resolution of Agilent/HP 8147 high performance OTDR.
3. Test values:
a. Cable and connections shall not have been subjected to physical or mechanical damage.
b. Connectors and splices shall be installed in accordance with industry standards.
c. The optical time domain reflectometer signal should be analyzed for excessive connection, splice, or cable backscatter by viewing the reflected power/distance graph.
Field Electrical Acceptance Tests
16950-30 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16950 (CONFORMED) d. Attenuation loss measurement shall be expressed in dB/km. Losses shall be within the manufacturer’s recommendations when no local site specifications are available.
e. Individual fusion splice losses shall not exceed 0.1 dB. Measurement results shall be recorded, validated by trace, and filed with the records of the respective cable runs.
S. Copper Ethernet cable installation testing:
1. Pre-installation:
a. Immediately prior to installation, verify that cable to be installed matches that which was submitted.
b. Verify that no damage has been done to the cable during shipping or handling.
c. Inspect cable for physical and mechanical damage.
d. Engineer shall be notified if a cable fails to meet inspection and the cable shall not be installed unless otherwise directed by the Engineer.
2. Post-installation:
a. Prior to copper Ethernet cable termination, perform cable end-to-end continuity validation testing on all installed cables, conductor pairs and cable shields using toner and probe kit. Any cable that fails testing shall be removed and replaced.
b. Inspect equipment outlet connectors for damage and ensure connectors hold tightly in field device ports.
3. Test equipment:
a. Certification equipment used for the testing shall be capable of verifying twisted pair cable installation with end-to-end continuity testing. b. Use only test cords and adapters that are qualified by test equipment manufacturer for channel or link test configuration.
c. Manufacturers: The following or equal:
1) Fluke Networks, IntelliTone Pro 200 Toner and Probe Kit, MT-8200-60-KIT.
d. Refer to Section 17950 - Commissioning for Instrumentation and Controls for Permanent Link testing requirements.
3.08 FIELD QUALITY CONTROL (NOT USED)
3.09 ADJUSTING (NOT USED)
3.10 CLEANING
A. As specified in Section 16050 - Common Work Results for Electrical.
B. After the acceptance tests have been completed, dispose of all testing expendables, vacuum all cabinets, and sweep clean all surrounding areas.
3.11 PROTECTION (NOT USED)
3.12 SCHEDULES (NOT USED)
END OF SECTION
Conduit Schedule
16990-1 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16990 (CONFORMED) SECTION 16990
CONDUIT SCHEDULE
PART 1 GENERAL
1.01 SUMMARY
A. Specific definitions:
1. Conduits:
a. ARM: Armored cable.
b. GRC: Galvanized rigid conduit.
c. PCS: PVC jacketed rigid steel conduit.
d. IMC: Intermediate metallic conduit.
e. EMT: Electrical metallic steel tubing.
f. PVC: Polyvinyl chloride rigid plastic conduit.
g. SLT: Sealtight - liquidtight flexible conduit.
h. RAC: Rigid aluminum conduit.
i. FLX: Flexible metallic conduit.
j. NFC: Non-metallic flexible conduit.
2. Cables:
a. DN Thick: DeviceNet “thick” cable.
b. DN Thin: DeviceNet “thin” cable.
c. PBPA: Profibus PA cable.
d. PBDP: Profibus DP cable.
e. PBDPP: Profibus DP cable with 24VDC power.
f. FFBUS: Foundation Fieldbus cable.
g. RS-485 RS-485 cable.
h. CAT5e: Category 5 enhanced Ethernet cable.
i. CAT6: Category 6 Ethernet cable.
j. CNET: ControlNet cable.
k. DH+: Data Highway Plus cable.
l. RIO: Remote I/O cable.
m. DF1: Serial cable.
n. MODB: Modbus cable.
o. MODB+: Modbus Plus cable.
p. */FO: Fiber optic cable (* indicates number of fibers). q. 2/C#16S: 2 conductor, 16 gauge, twisted shielded pair. (*/2/C#16S * indicates number of pairs).
r. 3/C#16S: 3 conductor, 16 gauge, twisted shielded triplet. (*/3/C#16S * indicates number of triplets).
s. */C#Y: Multiconductor cable (* indicates number of conductors, Y indicates conductor size and insulation).
t. MFR: Manufacturer or vendor furnished cable.
Conduit Schedule
16990-2 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16990 (CONFORMED) PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION
3.01 CONDUIT SCHEDULE
A. As specified in Attachment A - Conduit Schedule.
END OF SECTION
Conduit Schedule
16990-Attachment A 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16990 (CONFORMED)
ATTACHMENT A - CONDUIT SCHEDULE
PART 1 GENERAL
1.01 SUMMARY
A. Conduit requirements:
1. As defined in Section 16050 and Section 16130.
B. Cable requirements and definitions:
1. As defined in Section 16050 and Section 16123.
2. 2/CS#16: 2 conductor, 16 gauge, twisted shielded pair.
3. 3/CS#16: 3 conductor, 16 gauge, twisted shielded triplet.
4. */C#Y: Multiconductor cable (* indicates number of
conductors, Y indicates conductor size and insulation).
5. CAT6: Category 6 Ethernet cable.
6. MFR: Manufacturer or vendor furnished cable.
7. PULL: Pull Rope.
8. VFD: Shielded VFD cable with integral ground.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
3.01 CONDUIT SCHEDULE
A. Conduit Schedule is presented on the following pages.
SECTION 16990
CONDUIT SCHEDULE
AREA WTP RECYCLED WATER PS
July 12, 2023 - CONFORMED 16990-1 8660F10
CONDUIT SCHEDULE AREA WTP RECYCLED WATER PSENGINEER AMM Ukiah Recycled Water Project REVISION 0
DATE 4/4/23
CONDUIT CONDUCTORS GROUND
NUMBER DWG SIZE # SIZE TYPE # SIZE TYPE DESCRIPTION CONNECTING
SEGMENTS
C-2011 10E03 0.75" 2 #12 XHHW-2 1 #12 XHHW-2 FR: PMP-99411 C-2015 2 #14 XHHW-2 TO: J-BOX
2 #14 >> TSH-99411 CONTROL
2 #12 >> MWH-99411 POWER
C-2012 10E03 0.75" 2 #14 XHHW-2 1 #14 XHHW-2 FR: DISC-99411 C-2015 TO: J-BOX
2 #14 >> AUX3-99411 CONTROL
C-2013 10E03 0.75" 8 #14 XHHW-2 1 #14 XHHW-2 FR: LCP-99411 C-2015 TO: J-BOX
8 #14 >> LCP-99411 CONTROL
C-2015 10E02 2" 2 #12 XHHW-2 1 #12 XHHW-2 FR: J-BOX
10E03 16 #14 XHHW-2 TO: VFD-99411
2 #14 >> TSH-99411 CONTROL C-2011
2 #12 >> MWH-99411 POWER C-2011
2 #14 >> AUX3-99411 CONTROL C-2012
8 #14 >> LCP-99411 CONTROL C-2013
4 #14 >> FSL-99411 CONTROL C-2019
C-2019 10E03 0.75" 4 #14 XHHW-2 1 #14 XHHW-2 FR: FSL-99411 C-2015 TO: J-BOX
4 #14 >> FSL-99411 CONTROL C-2018
C-2021 10E03 0.75" 2 #12 XHHW-2 1 #12 XHHW-2 FR: PMP-99412 C-2025 2 #14 XHHW-2 TO: J-BOX
2 #14 >> TSH-99412 CONTROL
2 #12 >> MWH-99412 POWER
C-2022 10E03 0.75" 2 #14 XHHW-2 1 #14 XHHW-2 FR: DISC-99412 C-2025 TO: J-BOX
2 #14 >> AUX3-99412 CONTROL
C-2023 10E03 0.75" 8 #14 XHHW-2 1 #14 XHHW-2 FR: LCP-99412 C-2025 TO: J-BOX
8 #14 >> LCP-99412 CONTROL
C-2025 10E02 2" 2 #12 XHHW-2 1 #12 XHHW-2 FR: J-BOX
10E03 16 #14 XHHW-2 TO: VFD-99412
2 #14 >> TSH-99412 CONTROL C-2021
2 #12 >> MWH-99412 POWER C-2021
2 #14 >> AUX3-99412 CONTROL C-2022
8 #14 >> LCP-99412 CONTROL C-2023
4 #14 >> FSL-99412 CONTROL C-2029
C-2029 10E03 0.75" 4 #14 XHHW-2 1 #14 XHHW-2 FR: FSL-99412 C-2025 TO: J-BOX
4 #14 >> FSL-99412 CONTROL C-2028
C-2031 10E03 0.75" 2 #12 XHHW-2 1 #12 XHHW-2 FR: PMP-99413 C-2035 2 #14 XHHW-2 TO: J-BOX
2 #14 >> TSH-99413 CONTROL
2 #12 >> MWH-99413 POWER
C-2032 10E03 0.75" 2 #14 XHHW-2 1 #14 XHHW-2 FR: DISC-99413 C-2035 TO: J-BOX
2 #14 >> AUX3-99413 CONTROL
C-2033 10E03 0.75" 8 #14 XHHW-2 1 #14 XHHW-2 FR: LCP-99413 C-2035 TO: J-BOX
8 #14 >> LCP-99413 CONTROL
C-2035 10E02 2" 2 #12 XHHW-2 1 #12 XHHW-2 FR: J-BOX
10E03 16 #14 XHHW-2 TO: VFD-99413
2 #14 >> TSH-99413 CONTROL C-2031
2 #12 >> MWH-99413 POWER C-2031
2 #14 >> AUX3-99413 CONTROL C-2032
8 #14 >> LCP-99413 CONTROL C-2033
4 #14 >> FSL-99413 CONTROL C-2039
C-2039 10E03 0.75" 4 #14 XHHW-2 1 #14 XHHW-2 FR: FSL-99413 C-2035 TO: J-BOX
4 #14 >> FSL-99413 CONTROL C-2038
C-2041 10E03 0.75" 2 #12 XHHW-2 1 #12 XHHW-2 FR: PMP-99414 C-2045 2 #14 XHHW-2 TO: J-BOX
2 #14 >> TSH-99414 CONTROL
2 #12 >> MWH-99414 POWER
C-2042 10E03 0.75" 2 #14 XHHW-2 1 #14 XHHW-2 FR: DISC-99414 C-2045 TO: J-BOX
2 #14 >> AUX3-99414 CONTROL
July 12, 2023 - CONFORMED 16990-2 8660F10
CONDUIT SCHEDULE AREA WTP RECYCLED WATER PSENGINEER AMM Ukiah Recycled Water Project REVISION 0
DATE 4/4/23
CONDUIT CONDUCTORS GROUND
NUMBER DWG SIZE # SIZE TYPE # SIZE TYPE DESCRIPTION CONNECTING
SEGMENTS
C-2043 10E03 0.75" 8 #14 XHHW-2 1 #14 XHHW-2 FR: LCP-99414 C-2045 TO: J-BOX
8 #14 >> LCP-99414 CONTROL
C-2045 10E02 2" 2 #12 XHHW-2 1 #12 XHHW-2 FR: J-BOX
10E03 16 #14 XHHW-2 TO: VFD-99414
2 #14 >> TSH-99414 CONTROL C-2041
2 #12 >> MWH-99414 POWER C-2041
2 #14 >> AUX3-99414 CONTROL C-2042
8 #14 >> LCP-99414 CONTROL C-2043
4 #14 >> FSL-99414 CONTROL C-2049
C-2049 10E03 0.75" 4 #14 XHHW-2 1 #14 XHHW-2 FR: FSL-99414 C-2045 TO: J-BOX
4 #14 >> FSL-99414 CONTROL C-2048
C-3001 10E04 0.75" 4 #14 XHHW-2 1 #14 XHHW-2 FR: ZSOC-99402 C-3005 TO: J-BOX
4 #14 >> ZSOC-99402 CONTROL
C-3002 10E04 0.75" 4 #14 XHHW-2 1 #14 XHHW-2 FR: SV1-99402 C-3005 TO: J-BOX
4 #14 >> SV1-99402 CONTROL
C-3003 10E04 0.75" 4 #14 XHHW-2 1 #14 XHHW-2 FR: SV2-99402 C-3005 TO: J-BOX
4 #14 >> SV2-99402 CONTROL
C-3005 10E04 2" 12 #14 XHHW-2 1 #14 XHHW-2 FR: J-BOX C-3105 TO: HH-4
4 #14 >> ZSOC-99402 CONTROL C-3001
4 #14 >> SV1-99402 CONTROL C-3002
4 #14 >> SV2-99402 CONTROL C-3003
C-3100 10E04 0.75" 2 MFR CABLE 1 #14 XHHW-2 FR: LSLL-99403/LSHH-99403 TO: J-BOX
1 MFR >> LSLL-99403 CONTROL
1 MFR >> LSHH-99403 CONTROL
C-3102 10E04 2" 4 #14 XHHW-2 1 #14 XHHW-2 FR: J-BOX
TO: PCM-99400 (VIA HH-4)
2 #14 >> LSLL-99403 CONTROL
2 #14 >> LSHH-99403 CONTROL
C-3105 10E02 2" 12 #14 XHHW-2 1 #14 XHHW-2 FR: HH-4
TO: PCM-99400
4 #14 >> ZSOC-99402 CONTROL C-3005
4 #14 >> SV1-99402 CONTROL C-3005
4 #14 >> SV2-99402 CONTROL C-3005
L-1000 10E02 1.5" 4 #3 XHHW-2 1 #8 XHHW-2 FR: PNL-RWPS-L TO: XFMR-RWPS-L
4 #3 >> PNL-RWPS-L POWER
L-1100 10E02 0.75" 2 #12 XHHW-2 1 #12 XHHW-2 FR: FCU-99421 TO: CU-99421
2 #12 >> FCU-99421 POWER
L-1101 10E02 0.75" 2 #8 XHHW-2 1 #10 XHHW-2 FR: CU-99421 L-1102 TO: DISC-99421
2 #8 >> CU-99421 POWER
L-1102 10E02 0.75" 2 #8 XHHW-2 1 #10 XHHW-2 FR: DISC-99421 TO: PNL-RWPS-L
2 #8 >> CU-99421 POWER L-1101
L-1110 10E02 0.75" 2 #12 XHHW-2 1 #12 XHHW-2 FR: FCU-99422 TO: CU-99422
2 #12 >> FCU-99422 POWER
L-1111 10E02 0.75" 2 #8 XHHW-2 1 #10 XHHW-2 FR: CU-99422 L-1112 TO: DISC-99422
2 #8 >> CU-99422 POWER
L-1112 10E02 0.75" 2 #8 XHHW-2 1 #10 XHHW-2 FR: DISC-99422 TO: PNL-RWPS-L
2 #8 >> CU-99422 POWER L-1111
L-1200 10E02 0.75" 2 #12 XHHW-2 1 #12 XHHW-2 FR: PCM-99400 TO: PNL-RWPS-L
2 #12 >> PCM-99400 POWER NO. 1
July 12, 2023 - CONFORMED 16990-3 8660F10
CONDUIT SCHEDULE AREA WTP RECYCLED WATER PSENGINEER AMM Ukiah Recycled Water Project REVISION 0
DATE 4/4/23
CONDUIT CONDUCTORS GROUND
NUMBER DWG SIZE # SIZE TYPE # SIZE TYPE DESCRIPTION CONNECTING
SEGMENTS
L-1201 10E02 0.75" 2 #12 XHHW-2 1 #12 XHHW-2 FR: PCM-99400 TO: PNL-RWPS-L
2 #12 >> PCM-99400 POWER NO. 2
L-2100 10E03 2" 4 #12 XHHW-2 1 #12 XHHW-2 FR: PUMP STATION LIGHTING AND RECEPTACLE TO: PNL-RWPS-L
4 #12 >> LIGHTING AND RECEPTACLE
L-2431 10E02 2" 2 #12 XHHW-2 1 #12 XHHW-2 FR: FIT-99431 10E03 TO: PCM-99400
2 #12 >> FIT-99431 POWER
L-3100 10E04 2" 4 #12 XHHW-2 1 #12 XHHW-2 FR: TANK LIGHT AND RECEPTACLE L-3102 TO: HH-4
4 #12 >> TANK LIGHTING AND RECEPTACLE
L-3101 10E04 2" 4 #12 XHHW-2 1 #12 XHHW-2 FR: ROAD LIGHT L-3102 TO: HH-4
4 #12 >> ROAD LIGHTING AND RECEPTACLE
L-3102 10E02 2" 8 #12 XHHW-2 1 #12 XHHW-2 FR: HH-4
TO: PNL-RWPS-L
4 #12 >> ROAD LIGHTING AND RECEPTACLE L-3101
4 #12 >> TANK LIGHTING AND RECEPTACLE L-3100
L-3200 10E02 2" 2 #12 XHHW-2 1 #12 XHHW-2 FR: FIT-99406 10E04 TO: PCM-99400
2 #12 >> FIT-99406 POWER
N-1000 10E02 0.75" 1 CAT6 1 #14 XHHW-2 FR: RAD2-99400
TO: PLC-99400
1 CAT6 >> RAD2-99400 NETWORK
N-2001 10E02 0.75" 1 CAT6 1 #14 XHHW-2 FR: SWBD-RWPS
TO: PCM-99400
1 CAT6 >> SWBD-RWPS METER NETWORK
N-2011 10E02 1" 1 CAT6 1 #14 XHHW-2 FR: VFD-99411
TO: PCM-99400
1 CAT6 >> VFD-99411 NETWORK
N-2021 10E02 1" 1 CAT6 1 #14 XHHW-2 FR: VFD-99412
TO: PCM-99400
1 CAT6 >> VFD-99412 NETWORK
N-2031 10E02 1" 1 CAT6 1 #14 XHHW-2 FR: VFD-99413
TO: PCM-99400
1 CAT6 >> VFD-99413 NETWORK
N-2041 10E02 1" 1 CAT6 1 #14 XHHW-2 FR: VFD-99414
TO: PCM-99400
1 CAT6 >> VFD-99414 NETWORK
N-3100 10E02 2" 1 MFR CABLE 1 #14 XHHW-2 FR: ANT2-99400 10E04 TO: RAD2-99400
1 MFR >> ANT2-99400 NETWORK
N-5000 11E01 1" 1 CAT6 1 #14 XHHW-2 FR: RAD2-99400
TO: PLC12199
1 CAT6 >> RAD2-99400 NETWORK
N-5100 11E01 1" 1 MFR CABLE 1 #14 XHHW-2 FR: ANT2-99400 TO: RAD2-99400
1 MFR >> ANT2-99400 NETWORK
P-0001 10E01 4" 3 350 XHHW-2 1 #1 XHHW-2 FR: PNL-RWPS
TO: MCC-E
3 350 >> PNL-RWPS POWER NO. 1
P-0002 10E01 4" 3 350 XHHW-2 1 #1 XHHW-2 FR: PNL-RWPS
TO: MCC-E
3 350 >> PNL-RWPS POWER NO. 2
P-0010 10E01 4" 3 500 XHHW-2 1 #2/0 XHHW-2 FR: SWBD-RWPS 10E02 TO: PNL-RWPS (VIA HH-1, HH-2, HH-3)
3 500 >> SWBD-RWPS POWER NO. 1
P-0011 10E01 4" 3 500 XHHW-2 1 #2/0 XHHW-2 FR: SWBD-RWPS 10E02 TO: PNL-RWPS (VIA HH-1, HH-2, HH-3)
3 500 >> SWBD-RWPS POWER NO. 1
July 12, 2023 - CONFORMED 16990-4 8660F10
CONDUIT SCHEDULE AREA WTP RECYCLED WATER PSENGINEER AMM Ukiah Recycled Water Project REVISION 0
DATE 4/4/23
CONDUIT CONDUCTORS GROUND
NUMBER DWG SIZE # SIZE TYPE # SIZE TYPE DESCRIPTION CONNECTING
SEGMENTS
P-1000 10E02 1.5" 3 #3 XHHW-2 1 #8 XHHW-2 FR: XFMR-RWPS-L TO: SWBD-RWPS
3 #3 >> XFMR-RWPS-L POWER
P-2011 10E03 2" 1 3/C-#1:VFD VFD INTEGRAL FR: PMP-99411 P-2012 TO: DISC-99411
1 3/C-#1:VFD >> PMP-99411 POWER
P-2012 10E02 2" 1 3/C-#1:VFD VFD INTEGRAL FR: DISC-99411 10E03 TO: VFD-99411
1 3/C-#1:VFD >> PMP-99411 POWER P-2011
P-2013 10E02 1.5" 3 #1/0 XHHW-2 1 #6 XHHW-2 FR: VFD-99411 TO: SWBD-RWPS
3 #1/0 >> VFD-99411 POWER
P-2021 10E03 2" 1 3/C-#1:VFD VFD INTEGRAL FR: PMP-99412 P-2022 TO: DISC-99412
1 3/C-#1:VFD >> PMP-99412 POWER
P-2022 10E02 2" 1 3/C-#1:VFD VFD INTEGRAL FR: DISC-99412 10E03 TO: VFD-99412
1 3/C-#1:VFD >> PMP-99412 POWER P-2021
P-2023 10E02 1.5" 3 #1/0 XHHW-2 1 #6 XHHW-2 FR: VFD-99412 TO: SWBD-RWPS
3 #1/0 >> VFD-99412 POWER
P-2031 10E03 2" 1 3/C-#1:VFD VFD INTEGRAL FR: PMP-99413 P-2032 TO: DISC-99413
1 3/C-#1:VFD >> PMP-99413 POWER
P-2032 10E02 2" 1 3/C-#1:VFD VFD INTEGRAL FR: DISC-99413 10E03 TO: VFD-99413
1 3/C-#1:VFD >> PMP-99413 POWER P-2031
P-2033 10E02 1.5" 3 #1/0 XHHW-2 1 #6 XHHW-2 FR: VFD-99413 TO: SWBD-RWPS
3 #1/0 >> VFD-99413 POWER
P-2041 10E03 2" 1 3/C-#1:VFD VFD INTEGRAL FR: PMP-99414 P-2042 TO: DISC-99414
1 3/C-#1:VFD >> PMP-99414 POWER
P-2042 10E02 2" 1 3/C-#1:VFD VFD INTEGRAL FR: DISC-99414 10E03 TO: VFD-99414
1 3/C-#1:VFD >> PMP-99414 POWER P-2041
P-2043 10E02 1.5" 3 #1/0 XHHW-2 1 #6 XHHW-2 FR: VFD-99414 TO: SWBD-RWPS
3 #1/0 >> VFD-99414 POWER
S-2011 10E02 2" 1 3/CS-#16 1 #14 XHHW-2 FR: LCP-99411
10E03 TO: VFD-99411
1 3/CS-#16 >> HSS-99411 SIGNAL
S-2021 10E02 2" 1 3/CS-#16 1 #14 XHHW-2 FR: LCP-99412
10E03 TO: VFD-99412
1 3/CS-#16 >> HSS-99412 SIGNAL
S-2031 10E02 2" 1 3/CS-#16 1 #14 XHHW-2 FR: LCP-99413
10E03 TO: VFD-99413
1 3/CS-#16 >> HSS-99413 SIGNAL
S-2041 10E02 2" 1 3/CS-#16 1 #14 XHHW-2 FR: LCP-99414
10E03 TO: VFD-99414
1 3/CS-#16 >> HSS-99414 SIGNAL
S-2429 10E03 0.75" 1 2/CS-#16 1 #14 XHHW-2 FR: PIT-99432 S-2431 TO: JUNCTION BOX
1 2/CS-#16 >> PIT-99432 SIGNAL
S-2430 10E03 0.75" 1 2/CS-#16 1 #14 XHHW-2 FR: FIT-99431 S-2431 TO: JUNCTION BOX
1 2/CS-#16 >> FIT-99431 SIGNAL
S-2431 10E02 2" 2 2/CS-#16 1 #14 XHHW-2 FR: JUNCTION BOX 10E03 TO: PCM-99400
1 2/CS-#16 >> PIT-99432 SIGNAL S-2429
1 2/CS-#16 >> FIT-99431 SIGNAL S-2430
July 12, 2023 - CONFORMED 16990-5 8660F10
CONDUIT SCHEDULE AREA WTP RECYCLED WATER PSENGINEER AMM Ukiah Recycled Water Project REVISION 0
DATE 4/4/23
CONDUIT CONDUCTORS GROUND
NUMBER DWG SIZE # SIZE TYPE # SIZE TYPE DESCRIPTION CONNECTING
SEGMENTS
S-3100 10E04 0.75" 1 2/CS-#16 1 #14 XHHW-2 FR: LIT-99405 S-3101 TO: DESIC-99405
1 2/CS-#16 >> LIT-99405 SIGNAL
S-3101 10E04 2" 1 2/CS-#16 1 #14 XHHW-2 FR: DESIC-99405 TO: PCM-99400 (VIA HH-4)
1 2/CS-#16 >> LIT-99405 SIGNAL S-3100
S-3102 10E02 2" 1 2/CS-#16 1 #14 XHHW-2 FR: HH-4
TO: PCM-99400
1 2/CS-#16 >> FIT-99406 SIGNAL S-3200
S-3200 10E04 2" 1 2/CS-#16 1 #14 XHHW-2 FR: FIT-99406 S-3102 TO: HH-4
1 2/CS-#16 >> FIT-99406 SIGNAL
X-0010 10E01 4" 1 PULL ROPE FR: STUB-UP BY WATER TREATMENT BUILDING 10E02 TO: STUB-UP AT RWPS ELECTRICAL BUILDING (VIA HH-1, HH-2, HH-3) 1 PULL >> SPARE
X-0011 10E01 4" 1 PULL ROPE FR: STUB-UP BY WATER TREATMENT BUILDING 10E02 TO: STUB-UP AT RWPS ELECTRICAL BUILDING (VIA HH-1, HH-2, HH-3) 1 PULL >> SPARE
X-1500 10E02 2" 1 PULL ROPE FR: HH-4
TO: STUB-UP AT RWPS ELECTRICAL BUILDING
1 PULL >> SPARE
X-1501 10E02 2" 1 PULL ROPE FR: HH-4
TO: STUB-UP AT RWPS ELECTRICAL BUILDING
1 PULL >> SPARE
X-1502 10E02 2" 1 PULL ROPE FR: HH-4
TO: STUB-UP AT RWPS ELECTRICAL BUILDING
1 PULL >> SPARE
X-2011 10E02 2" 1 PULL ROPE FR: PMP-99411
10E03 TO: VFD-99411
1 PULL >> SPARE
X-2021 10E02 2" 1 PULL ROPE FR: PMP-99412
10E03 TO: VFD-99412
1 PULL >> SPARE
X-2031 10E02 2" 1 PULL ROPE FR: PMP-99413
10E03 TO: VFD-99413
1 PULL >> SPARE
X-2041 10E02 2" 1 PULL ROPE FR: PMP-99414
10E03 TO: VFD-99414
1 PULL >> SPARE
X-2051 10E02 2" 1 PULL ROPE FR: PMP-99415
10E03 TO: VFD-99415
1 PULL >> SPARE
X-2052 10E02 2" 1 PULL ROPE FR: PMP-99415
10E03 TO: VFD-99415
1 PULL >> SPARE
X-2053 10E02 2" 1 PULL ROPE FR: PMP-99415
10E03 TO: VFD-99415
1 PULL >> SPARE
X-2054 10E02 2" 1 PULL ROPE FR: PMP-99415
10E03 TO: VFD-99415
1 PULL >> SPARE
X-2055 10E02 2" 1 PULL ROPE FR: VFD-99415
TO: SWBD-RWPS
1 PULL >> SPARE
X-2056 10E02 2" 1 PULL ROPE FR: VFD-99415
TO: PCM-99400
1 PULL >> SPARE
X-2100 10E02 2" 1 PULL ROPE FR: STUB-UP AT PUMP STATION 10E03 TO: ELECTRICAL ROOM
1 PULL >> SPARE
X-2101 10E02 2" 1 PULL ROPE FR: STUB-UP AT PUMP STATION 10E03 TO: ELECTRICAL ROOM
1 PULL >> SPARE
July 12, 2023 - CONFORMED 16990-6 8660F10
CONDUIT SCHEDULE AREA WTP RECYCLED WATER PSENGINEER AMM Ukiah Recycled Water Project REVISION 0
DATE 4/4/23
CONDUIT CONDUCTORS GROUND
NUMBER DWG SIZE # SIZE TYPE # SIZE TYPE DESCRIPTION CONNECTING
SEGMENTS
X-3100 10E02 2" 1 PULL ROPE FR: STUB-UP BY TANK
10E04 TO: ELECTRICAL ROOM
1 PULL >> SPARE
X-3101 10E02 2" 1 PULL ROPE FR: STUB-UP BY TANK
10E04 TO: ELECTRICAL ROOM
1 PULL >> SPARE
X-3102 99E04 2" 1 PULL ROPE FR: STUB-UP BY CONTROL VALVE TO: HH-4
1 PULL >> SPARE
X-3103 99E04 2" 1 PULL ROPE FR: STUB-UP BY CONTROL VALVE TO: HH-4
1 PULL >> SPARE
X-3104 99E02 2" 1 PULL ROPE FR: HH-4
TO: ELECTRICAL ROOM
1 PULL >> SPARE
X-3200 10E02 2" 1 PULL ROPE FR: HH-4
TO: ELECTRICAL ROOM
1 PULL >> SPARE
END OF CONDUIT SCHEDULE
END OF SECTION
July 12, 2023 - CONFORMED 16990-7 8660F10
PART 1 GENERAL
1.01 SUMMARY
A. Conduit requirements:
1. As defined in Section 16050 and Section 16130.
B. Cable requirements and definitions:
1. As defined in Section 16050 and Section 16123.
2. 2/CS#16: 2 conductor, 16 gauge, twisted shielded pair.
3. CAT6: Category 6 Ethernet cable.
4. MFR: Manufacturer or vendor furnished cable.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
3.01 CONDUIT SCHEDULE
A. Conduit Schedule is presented on the following pages.
SECTION 16990
CONDUIT SCHEDULE
AREA 85
July 12, 2023 - CONFORMED 16990-1 8660F10
CONDUIT SCHEDULE AREA ENGINEER HADI
RECYCLE WATER PROJECT REVISION
AWT BUILDING DATE 4/4/23
CONDUIT CONDUCTORS GROUND
NUMBER DWG SIZE # SIZE TYPE # SIZE TYPE DESCRIPTION CONNECTING
SEGMENTS
C-85-100 1.5" 28 #14 XHHW-2 1 #14 XHHW-2 FR: PB-8511 C-85-201 TO: CONDUIT TEE
10 #14 >> FV-85217 CONTROL P-85-100
8 #14 >> FCV-85218 CONTROL P-85-105
10 #14 >> FV-85219 CONTROL P-85-110
C-85-110 0.75" 1 MFR CABLE 1 #14 XHHW-2 FR: LSL-85101 C-85-112 TO: JUNCTION BOX
1 MFR >> LSL-85101 CONTROL
C-85-111 0.75" 1 MFR CABLE 1 #14 XHHW-2 FR: LSH-85101 C-85-112 TO: JUNCTION BOX
1 MFR >> LSH-85101 CONTROL
C-85-112 0.75" 4 #14 XHHW-2 1 #14 XHHW-2 FR: JUNCTION BOX C-85-123 TO: CONDUIT TEE
2 #14 >> LSH-85101 CONTROL C-85-111
2 #14 >> LSL-85101 CONTROL C-85-110
C-85-120 0.75" 1 MFR CABLE 1 #14 XHHW-2 FR: LSL-85102 C-85-122 TO: JUNCTION BOX
1 MFR >> LSL-85102 CONTROL
C-85-121 0.75" 1 MFR CABLE 1 #14 XHHW-2 FR: LSH-85102 C-85-122 TO: CONDUIT TEE
1 MFR >> LSH-85102 CONTROL
C-85-122 0.75" 4 #14 XHHW-2 1 #14 XHHW-2 FR: CONDUIT TEE C-85-123 TO: CONDUIT TEE
2 #14 >> LSH-85102 CONTROL C-85-121
2 #14 >> LSL-85102 CONTROL C-85-120
C-85-123 0.75" 8 #14 XHHW-2 1 #14 XHHW-2 FR: CONDUIT TEE C-85-133 TO: CONDUIT TEE
2 #14 >> LSH-85101 CONTROL C-85-112
2 #14 >> LSL-85101 CONTROL C-85-112
2 #14 >> LSH-85102 CONTROL C-85-122
2 #14 >> LSL-85102 CONTROL C-85-122
C-85-130 0.75" 2 #14 XHHW-2 1 #14 XHHW-2 FR: LSL-85103 C-85-132 TO: CONDUIT TEE
2 #14 >> LSL-85103 CONTROL
C-85-131 0.75" 2 #14 XHHW-2 1 #14 XHHW-2 FR: LSH-85103 C-85-132 TO: CONDUIT TEE
2 #14 >> LSH-85103 CONTROL
C-85-132 0.75" 4 #14 XHHW-2 1 #14 XHHW-2 FR: CONDUIT TEE C-85-133 TO: CONDUIT TEE
2 #14 >> LSH-85103 CONTROL C-85-131
2 #14 >> LSL-85103 CONTROL C-85-130
C-85-133 1" 12 #14 XHHW-2 1 #14 XHHW-2 FR: CONDUIT TEE C-85-145 TO: CONDUIT TEE
2 #14 >> LSH-85101 CONTROL C-85-123
2 #14 >> LSL-85101 CONTROL C-85-123
2 #14 >> LSH-85102 CONTROL C-85-123
2 #14 >> LSL-85102 CONTROL C-85-123
2 #14 >> LSH-85103 CONTROL C-85-132
2 #14 >> LSL-85103 CONTROL C-85-132
C-85-140 0.75" 2 #14 XHHW-2 1 #14 XHHW-2 FR: LSL-85104 C-85-142 TO: CONDUIT TEE
2 #14 >> LSL-85104 CONTROL
C-85-141 0.75" 2 #14 XHHW-2 1 #14 XHHW-2 FR: LSH-85104 C-85-142 TO: CONDUIT TEE
2 #14 >> LSH-85104 CONTROL
C-85-142 0.75" 4 #14 XHHW-2 1 #14 XHHW-2 FR: CONDUIT TEE C-85-145 TO: CONDUIT TEE
2 #14 >> LSH-85104 CONTROL C-85-141
2 #14 >> LSL-85104 CONTROL C-85-140
C-85-145 1" 16 #14 XHHW-2 1 #14 XHHW-2 FR: CONDUIT TEE C-85-402 TO: PB-8501
2 #14 >> LSH-85101 CONTROL C-85-133
2 #14 >> LSL-85101 CONTROL C-85-133
2 #14 >> LSH-85102 CONTROL C-85-133
2 #14 >> LSL-85102 CONTROL C-85-133
2 #14 >> LSH-85103 CONTROL C-85-133
2 #14 >> LSL-85103 CONTROL C-85-133
2 #14 >> LSH-85104 CONTROL C-85-142
2 #14 >> LSL-85104 CONTROL C-85-142
July 12, 2023 - CONFORMED 16990-2 8660F10
CONDUIT SCHEDULE AREA ENGINEER HADI
RECYCLE WATER PROJECT REVISION
AWT BUILDING DATE 4/4/23
CONDUIT CONDUCTORS GROUND
NUMBER DWG SIZE # SIZE TYPE # SIZE TYPE DESCRIPTION CONNECTING
SEGMENTS
C-85-150 1.5" 28 #14 XHHW-2 1 #14 XHHW-2 FR: PB-8521 C-85-251 TO: CONDUIT TEE
8 #14 >> FCV-85211 CONTROL
10 #14 >> FV-85212 CONTROL
10 #14 >> FV-85214 CONTROL
C-85-200 1.5" 28 #14 XHHW-2 1 #14 XHHW-2 FR: PB-8512 C-85-201 TO: CONDUIT TEE
10 #14 >> FV-85227 CONTROL P-85-200
8 #14 >> FCV-85228 CONTROL P-85-205
10 #14 >> FV-85229 CONTROL P-85-210
C-85-201 2" 56 #14 XHHW-2 1 #14 XHHW-2 FR: CONDUIT TEE C-85-301 TO: CONDUIT TEE
10 #14 >> FV-85217 CONTROL C-85-100
8 #14 >> FCV-85218 CONTROL C-85-100
10 #14 >> FV-85219 CONTROL C-85-100
10 #14 >> FV-85227 CONTROL C-85-200
8 #14 >> FCV-85228 CONTROL C-85-200
10 #14 >> FV-85229 CONTROL C-85-200
C-85-250 1.5" 28 #14 XHHW-2 1 #14 XHHW-2 FR: PB-8522 C-85-251 TO: CONDUIT TEE
8 #14 >> FCV-85221 CONTROL
10 #14 >> FV-85222 CONTROL
10 #14 >> FV-85224 CONTROL
C-85-251 2" 56 #14 XHHW-2 1 #14 XHHW-2 FR: CONDUIT TEE C-85-351 TO: CONDUIT TEE
8 #14 >> FCV-85221 CONTROL C-85-250
10 #14 >> FV-85222 CONTROL C-85-250
10 #14 >> FV-85224 CONTROL C-85-250
8 #14 >> FCV-85211 CONTROL C-85-150
10 #14 >> FV-85212 CONTROL C-85-150
10 #14 >> FV-85214 CONTROL C-85-150
C-85-300 1.5" 28 #14 XHHW-2 1 #14 XHHW-2 FR: PB-8513 C-85-301 TO: CONDUIT TEE
10 #14 >> FV-85239 CONTROL P-85-310
8 #14 >> FCV-85238 CONTROL P-85-305
10 #14 >> FV-85237 CONTROL P-85-300
C-85-301 2.5" 84 #14 XHHW-2 1 #14 XHHW-2 FR: CONDUIT TEE C-85-401 TO: CONDUIT TEE
10 #14 >> FV-85239 CONTROL C-85-300
8 #14 >> FCV-85238 CONTROL C-85-300
10 #14 >> FV-85237 CONTROL C-85-300
10 #14 >> FV-85217 CONTROL C-85-201
8 #14 >> FCV-85218 CONTROL C-85-201
10 #14 >> FV-85219 CONTROL C-85-201
10 #14 >> FV-85227 CONTROL C-85-201
8 #14 >> FCV-85228 CONTROL C-85-201
10 #14 >> FV-85229 CONTROL C-85-201
C-85-350 1.5" 28 #14 XHHW-2 1 #14 XHHW-2 FR: PB-8523 C-85-351 TO: CONDUIT TEE
8 #14 >> FCV-85231 CONTROL
10 #14 >> FV-85232 CONTROL
10 #14 >> FV-85234 CONTROL
C-85-351 2.5" 84 #14 XHHW-2 1 #14 XHHW-2 FR: CONDUIT TEE C-85-455 TO: CONDUIT TEE
8 #14 >> FCV-85221 CONTROL C-85-251
10 #14 >> FV-85222 CONTROL C-85-251
10 #14 >> FV-85224 CONTROL C-85-251
8 #14 >> FCV-85211 CONTROL C-85-251
10 #14 >> FV-85212 CONTROL C-85-251
10 #14 >> FV-85214 CONTROL C-85-251
8 #14 >> FCV-85231 CONTROL C-85-350
10 #14 >> FV-85232 CONTROL C-85-350
10 #14 >> FV-85234 CONTROL C-85-350
C-85-400 1.5" 28 #14 XHHW-2 1 #14 XHHW-2 FR: PB-8514 C-85-401 TO: CONDUIT TEE
10 #14 >> FV-85247 CONTROL P-85-400
8 #14 >> FCV-85248 CONTROL P-85-405
10 #14 >> FV-85249 CONTROL P-85-410
July 12, 2023 - CONFORMED 16990-3 8660F10
CONDUIT SCHEDULE AREA ENGINEER HADI
RECYCLE WATER PROJECT REVISION
AWT BUILDING DATE 4/4/23
CONDUIT CONDUCTORS GROUND
NUMBER DWG SIZE # SIZE TYPE # SIZE TYPE DESCRIPTION CONNECTING
SEGMENTS
C-85-401 2.5" 112 #14 XHHW-2 1 #14 XHHW-2 FR: CONDUIT TEE C-85-402 TO: PB-8501
10 #14 >> FV-85247 CONTROL C-85-400
8 #14 >> FCV-85248 CONTROL C-85-400
10 #14 >> FV-85249 CONTROL C-85-400
10 #14 >> FV-85239 CONTROL C-85-301
8 #14 >> FCV-85238 CONTROL C-85-301
10 #14 >> FV-85237 CONTROL C-85-301
10 #14 >> FV-85217 CONTROL C-85-301
8 #14 >> FCV-85218 CONTROL C-85-301
10 #14 >> FV-85219 CONTROL C-85-301
10 #14 >> FV-85227 CONTROL C-85-301
8 #14 >> FCV-85228 CONTROL C-85-301
10 #14 >> FV-85229 CONTROL C-85-301
C-85-402 3" 138 #14 XHHW-2 1 #14 XHHW-2 FR: PB-8501
TO: VCP-3
10 #14 >> FV-85247 CONTROL C-85-401
8 #14 >> FCV-85248 CONTROL C-85-401
10 #14 >> FV-85249 CONTROL C-85-401
10 #14 >> FV-85239 CONTROL C-85-401
8 #14 >> FCV-85238 CONTROL C-85-401
10 #14 >> FV-85237 CONTROL C-85-401
10 #14 >> FV-85217 CONTROL C-85-401
8 #14 >> FCV-85218 CONTROL C-85-401
10 #14 >> FV-85219 CONTROL C-85-401
10 #14 >> FV-85227 CONTROL C-85-401
8 #14 >> FCV-85228 CONTROL C-85-401
10 #14 >> FV-85229 CONTROL C-85-401
2 #14 >> LSH-85101 CONTROL C-85-145
2 #14 >> LSL-85101 CONTROL C-85-145
2 #14 >> LSH-85102 CONTROL C-85-145
2 #14 >> LSL-85102 CONTROL C-85-145
2 #14 >> LSH-85103 CONTROL C-85-145
2 #14 >> LSL-85103 CONTROL C-85-145
2 #14 >> LSH-85104 CONTROL C-85-145
2 #14 >> LSL-85104 CONTROL C-85-145
10 #14 >> FV-87130 CONTROL
C-85-450 1.5" 28 #14 XHHW-2 1 #14 XHHW-2 FR: PB-8524 C-85-455 TO: CONDUIT TEE
8 #14 >> FCV-85241 CONTROL
10 #14 >> FV-85242 CONTROL
10 #14 >> FV-85244 CONTROL
C-85-455 2.5" 112 #14 XHHW-2 1 #14 XHHW-2 FR: CONDUIT TEE C-85-457 TO: PB-8501
8 #14 >> FCV-85221 CONTROL C-85-351
10 #14 >> FV-85222 CONTROL C-85-351
10 #14 >> FV-85224 CONTROL C-85-351
8 #14 >> FCV-85211 CONTROL C-85-351
10 #14 >> FV-85212 CONTROL C-85-351
10 #14 >> FV-85214 CONTROL C-85-351
8 #14 >> FCV-85231 CONTROL C-85-351
10 #14 >> FV-85232 CONTROL C-85-351
10 #14 >> FV-85234 CONTROL C-85-351
8 #14 >> FCV-85241 CONTROL C-85-450
10 #14 >> FV-85242 CONTROL C-85-450
10 #14 >> FV-85244 CONTROL C-85-450
C-85-457 2.5" 112 #14 XHHW-2 1 #14 XHHW-2 FR: PB-8501
TO: VCP-3
8 #14 >> FCV-85221 CONTROL C-85-455
10 #14 >> FV-85222 CONTROL C-85-455
10 #14 >> FV-85224 CONTROL C-85-455
8 #14 >> FCV-85211 CONTROL C-85-455
10 #14 >> FV-85212 CONTROL C-85-455
10 #14 >> FV-85214 CONTROL C-85-455
8 #14 >> FCV-85231 CONTROL C-85-455
10 #14 >> FV-85232 CONTROL C-85-455
10 #14 >> FV-85234 CONTROL C-85-455
8 #14 >> FCV-85241 CONTROL C-85-455
10 #14 >> FV-85242 CONTROL C-85-455
10 #14 >> FV-85244 CONTROL C-85-455
C-85-501 0.75" 2 #12 XHHW-2 1 #12 XHHW-2 FR: BLO-85106 C-85-510 2 #14 XHHW-2 TO: JUNCTION BOX
2 #12 >> BLO-85106 MWH
2 #14 >> BLO-85106 TSH
C-85-503 0.75" 4 #14 XHHW-2 1 #14 XHHW-2 FR: PDSH-85106 C-85-510 TO: JUNCTION BOX
4 #14 >> PDSH-85106 CONTROL
July 12, 2023 - CONFORMED 16990-4 8660F10
CONDUIT SCHEDULE AREA ENGINEER HADI
RECYCLE WATER PROJECT REVISION
AWT BUILDING DATE 4/4/23
CONDUIT CONDUCTORS GROUND
NUMBER DWG SIZE # SIZE TYPE # SIZE TYPE DESCRIPTION CONNECTING
SEGMENTS
C-85-505 0.75" 2 #14 XHHW-2 1 #14 XHHW-2 FR: PSH-85106 C-85-510 TO: JUNCTION BOX
2 #14 >> PSH-85106 CONTROL
C-85-507 0.75" 6 #14 XHHW-2 1 #14 XHHW-2 FR: LCP-85106 C-85-510 TO: JUNCTION BOX
6 #14 >> LCP-85106 CONTROL
C-85-510 1" 2 #12 XHHW-2 1 #12 XHHW-2 FR: JUNCTION BOX C-85-545 14 #14 XHHW-2 TO: PB-8530
6 #14 >> LCP-85106 CONTROL C-85-507
2 #14 >> PSH-85106 CONTROL C-85-505
4 #14 >> PDSH-85106 CONTROL C-85-503
2 #12 >> BLO-85106 MWH C-85-501
2 #14 >> BLO-85106 TSH C-85-501
C-85-511 0.75" 2 #12 XHHW-2 1 #12 XHHW-2 FR: BLO-85107 C-85-520 2 #14 XHHW-2 TO: JUNCTION BOX
2 #12 >> BLO-85107 MWH
2 #14 >> BLO-85107 TSH
C-85-513 0.75" 4 #14 XHHW-2 1 #14 XHHW-2 FR: PDSH-85107 C-85-520 TO: JUNCTION BOX
4 #14 >> PDSH-85107 CONTROL
C-85-515 0.75" 2 #14 XHHW-2 1 #14 XHHW-2 FR: PSH-85107 C-85-520 TO: JUNCTION BOX
2 #14 >> PSH-85107 CONTROL
C-85-517 0.75" 6 #14 XHHW-2 1 #14 XHHW-2 FR: LCP-85107 C-85-520 TO: JUNCTION BOX
6 #14 >> LCP-85107 CONTROL
C-85-520 1" 2 #12 XHHW-2 1 #12 XHHW-2 FR: JUNCTION BOX C-85-545 14 #14 XHHW-2 TO: PB-8530
6 #14 >> LCP-85107 CONTROL C-85-517
2 #14 >> PSH-85107 CONTROL C-85-515
4 #14 >> PDSH-85107 CONTROL C-85-513
2 #12 >> BLO-85107 MWH C-85-511
2 #14 >> BLO-85107 TSH C-85-511
C-85-521 0.75" 2 #12 XHHW-2 1 #12 XHHW-2 FR: BLO-85108 C-85-530 2 #14 XHHW-2 TO: JUNCTION BOX
2 #12 >> BLO-85108 MWH
2 #14 >> BLO-85108 TSH
C-85-523 0.75" 4 #14 XHHW-2 1 #14 XHHW-2 FR: PDSH-85108 C-85-530 TO: JUNCTION BOX
4 #14 >> PDSH-85108 CONTROL
C-85-525 0.75" 2 #14 XHHW-2 1 #14 XHHW-2 FR: PSH-85108 C-85-530 TO: JUNCTION BOX
2 #14 >> PSH-85108 CONTROL
C-85-527 0.75" 6 #14 XHHW-2 1 #14 XHHW-2 FR: LCP-85108 C-85-530 TO: JUNCTION BOX
6 #14 >> LCP-85108 CONTROL
C-85-530 1" 2 #12 XHHW-2 1 #12 XHHW-2 FR: JUNCTION BOX C-85-545 14 #14 XHHW-2 TO: PB-8530
6 #14 >> LCP-85108 CONTROL C-85-527
2 #14 >> PSH-85108 CONTROL C-85-525
4 #14 >> PDSH-85108 CONTROL C-85-523
2 #12 >> BLO-85108 MWH C-85-521
2 #14 >> BLO-85108 TSH C-85-521
C-85-540 0.75" 2 #14 XHHW-2 1 #14 XHHW-2 FR: PSL-85100 C-85-542 TO: PB-8530
2 #14 >> PSL-85100 CONTROL
C-85-542 0.75" 2 #14 XHHW-2 1 #14 XHHW-2 FR: PB-8530
TO: VCP-3
2 #14 >> PSL-85100 CONTROL C-85-540
July 12, 2023 - CONFORMED 16990-5 8660F10
CONDUIT SCHEDULE AREA ENGINEER HADI
RECYCLE WATER PROJECT REVISION
AWT BUILDING DATE 4/4/23
CONDUIT CONDUCTORS GROUND
NUMBER DWG SIZE # SIZE TYPE # SIZE TYPE DESCRIPTION CONNECTING
SEGMENTS
C-85-545 2" 6 #12 XHHW-2 1 #12 XHHW-2 FR: PB-8530
42 #14 XHHW-2 TO: MCC-C
6 #14 >> LCP-85108 CONTROL C-85-530
2 #14 >> PSH-85108 CONTROL C-85-530
4 #14 >> PDSH-85108 CONTROL C-85-530
2 #12 >> BLO-85108 MWH C-85-530
2 #14 >> BLO-85108 TSH C-85-530
6 #14 >> LCP-85107 CONTROL C-85-520
2 #14 >> PSH-85107 CONTROL C-85-520
4 #14 >> PDSH-85107 CONTROL C-85-520
2 #12 >> BLO-85107 MWH C-85-520
2 #14 >> BLO-85107 TSH C-85-520
6 #14 >> LCP-85106 CONTROL C-85-510
2 #14 >> PSH-85106 CONTROL C-85-510
4 #14 >> PDSH-85106 CONTROL C-85-510
2 #12 >> BLO-85106 MWH C-85-510
2 #14 >> BLO-85106 TSH C-85-510
C-85-550 1.5" 39 #14 XHHW-2 1 #14 XHHW-2 FR: MCC-C
TO: VCP-3
10 #14 >> BLO-85106 CONTROL
3 #14 >> FAN-85109 CONTROL
10 #14 >> BLO-85107 CONTROL
3 #14 >> FAN-85110 CONTROL
10 #14 >> BLO-85108 CONTROL
3 #14 >> FAN-85111 CONTROL
C-85-610 0.75" 6 #14 XHHW-2 1 #14 XHHW-2 FR: LCP-85104 C-85-612 TO: JUNCTION BOX
6 #14 >> LCP-85104 CONTROL
C-85-612 0.75" 2 #12 XHHW-2 1 #12 XHHW-2 FR: JUNCTION BOX 8 #14 XHHW-2 TO: CONDUIT TEE
2 #12 >> PMP-85104 MWH P-85-610
2 #14 >> PMP-85104 TSH P-85-610
6 #14 >> LCP-85104 CONTROL C-85-610
C-85-614 0.75" 2 #12 XHHW-2 1 #12 XHHW-2 FR: CONDUIT TEE 2 #14 XHHW-2 TO: MCC-C
2 #12 >> PMP-85104 MWH
2 #14 >> PMP-85104 TSH
C-85-616 0.75" 6 #14 XHHW-2 1 #14 XHHW-2 FR: CONDUIT TEE TO: PLC-4
6 #14 >> LCP-85104 CONTROL
C-85-620 0.75" 10 #14 XHHW-2 1 #14 XHHW-2 FR: MCC-C
TO: PLC-4
10 #14 >> PMP-85104 CONTROL
N-85-500 0.75" 1 CAT6 1 #14 XHHW-2 FR: VCP-3
TO: PLC-4
1 CAT6 >> VCP-3 NETWORK
N-85-510 0.75" 1 CAT6 1 #14 XHHW-2 FR: HMI WORK STATION TO: PLC-4
1 CAT6 >> HMI WORK STATION NETWORK
P-85-100 1" 3 #12 XHHW-2 1 #12 XHHW-2 FR: FV-85217 C-85-100 10 #14 XHHW-2 TO: PB-8511
3 #12 >> FV-85217 POWER
10 #14 >> FV-85217 CONTROL
P-85-101 0.75" 6 #12 XHHW-2 1 #12 XHHW-2 FR: DISC-85217 TO: PB-8511
6 #12 >> FV-85217 POWER
P-85-105 1" 3 #12 XHHW-2 1 #12 XHHW-2 FR: FCV-85218 C-85-100 8 #14 XHHW-2 TO: PB-8511
3 #12 >> FCV-85218 POWER
8 #14 >> FCV-85218 CONTROL
P-85-106 0.75" 6 #12 XHHW-2 1 #12 XHHW-2 FR: DISC-85218 TO: PB-8511
6 #12 >> FCV-85218 POWER
P-85-110 1" 3 #12 XHHW-2 1 #12 XHHW-2 FR: FV-85219 C-85-100 10 #14 XHHW-2 TO: PB-8511
3 #12 >> FV-85219 POWER
10 #14 >> FV-85219 CONTROL
July 12, 2023 - CONFORMED 16990-6 8660F10
CONDUIT SCHEDULE AREA ENGINEER HADI
RECYCLE WATER PROJECT REVISION
AWT BUILDING DATE 4/4/23
CONDUIT CONDUCTORS GROUND
NUMBER DWG SIZE # SIZE TYPE # SIZE TYPE DESCRIPTION CONNECTING
SEGMENTS
P-85-111 0.75" 6 #12 XHHW-2 1 #12 XHHW-2 FR: DISC-85219 TO: PB-8511
6 #12 >> FV-85219 POWER
P-85-120 0.75" 3 #10 XHHW-2 1 #10 XHHW-2 FR: PB-8511 P-85-221 TO: CONDUIT TEE
3 #10 >> FV-85217, FCV-85218, FV-85219 POWER
P-85-150 1" 3 #12 XHHW-2 1 #12 XHHW-2 FR: FCV-85211
8 #14 XHHW-2 TO: PB-8521
3 #12 >> FCV-85211 POWER
8 #14 >> FCV-85211 CONTROL
P-85-151 0.75" 6 #12 XHHW-2 1 #12 XHHW-2 FR: DISC-85211 TO: PB-8521
6 #12 >> FCV-85241 POWER
P-85-155 1" 3 #12 XHHW-2 1 #12 XHHW-2 FR: FV-85212
10 #14 XHHW-2 TO: PB-8521
3 #12 >> FV-85212 POWER
10 #14 >> FV-85212 CONTROL
P-85-156 0.75" 6 #12 XHHW-2 1 #12 XHHW-2 FR: DISC-85212 TO: PB-8521
6 #12 >> FV-85212 POWER
P-85-160 1" 3 #12 XHHW-2 1 #12 XHHW-2 FR: FV-85214
10 #14 XHHW-2 TO: PB-8521
3 #12 >> FV-85214 POWER
10 #14 >> FV-85214 CONTROL
P-85-161 0.75" 6 #10 XHHW-2 1 #10 XHHW-2 FR: DISC-85214 TO: PB-8521
6 #10 >> FV-85214 POWER
P-85-170 0.75" 3 #10 XHHW-2 1 #10 XHHW-2 FR: PB-8521 P-85-275 TO: CONDUIT TEE
3 #10 >> FCV-85211, FV-85212, FV-85214 POWER
P-85-200 1" 3 #12 XHHW-2 1 #12 XHHW-2 FR: FV-85227 C-85-200 10 #14 XHHW-2 TO: PB-8512
3 #12 >> FV-85227 POWER
10 #14 >> FV-85227 CONTROL
P-85-201 0.75" 6 #12 XHHW-2 1 #12 XHHW-2 FR: DISC-85227 TO: PB-8512
6 #12 >> FV-85227 POWER
P-85-205 1" 3 #12 XHHW-2 1 #12 XHHW-2 FR: FCV-85228 C-85-200 8 #14 XHHW-2 TO: PB-8512
3 #12 >> FCV-85228 POWER
8 #14 >> FCV-85228 CONTROL
P-85-206 0.75" 6 #12 XHHW-2 1 #12 XHHW-2 FR: DISC-85228 TO: PB-8512
6 #12 >> FCV-85228 POWER
P-85-210 1" 3 #12 XHHW-2 1 #12 XHHW-2 FR: FV-85229 C-85-200 10 #14 XHHW-2 TO: PB-8512
3 #12 >> FV-85229 POWER
10 #14 >> FV-85229 CONTROL
P-85-211 0.75" 6 #12 XHHW-2 1 #12 XHHW-2 FR: DISC-85229 TO: PB-8512
6 #12 >> FV-85229 POWER
P-85-220 0.75" 3 #10 XHHW-2 1 #10 XHHW-2 FR: PB-8512 P-85-221 TO: CONDUIT TEE
3 #10 >> FV-85227, FCV-85228, FV-85229 POWER
P-85-221 0.75" 6 #10 XHHW-2 1 #10 XHHW-2 FR: CONDUIT TEE P-85-222 TO: PB-8501
3 #10 >> FV-85217, FCV-85218, FV-85219 POWER P-85-120
3 #10 >> FV-85227, FCV-85228, FV-85229 POWER P-85-220
P-85-222 0.75" 6 #10 XHHW-2 1 #10 XHHW-2 FR: PB-8501
TO: DP2
3 #10 >> FV-85217, FCV-85218, FV-85219 POWER P-85-221
3 #10 >> FV-85227, FCV-85228, FV-85229 POWER P-85-221
July 12, 2023 - CONFORMED 16990-7 8660F10
CONDUIT SCHEDULE AREA ENGINEER HADI
RECYCLE WATER PROJECT REVISION
AWT BUILDING DATE 4/4/23
CONDUIT CONDUCTORS GROUND
NUMBER DWG SIZE # SIZE TYPE # SIZE TYPE DESCRIPTION CONNECTING
SEGMENTS
P-85-250 1" 3 #12 XHHW-2 1 #12 XHHW-2 FR: FCV-85221
8 #14 XHHW-2 TO: PB-8522
3 #12 >> FCV-85221 POWER
8 #14 >> FCV-85221 CONTROL
P-85-251 0.75" 6 #12 XHHW-2 1 #12 XHHW-2 FR: DISC-85221 TO: PB-8522
6 #12 >> FCV-85221 POWER
P-85-255 1" 3 #12 XHHW-2 1 #12 XHHW-2 FR: FV-85222
10 #14 XHHW-2 TO: PB-8521
3 #12 >> FV-85222 POWER
10 #14 >> FV-85222 CONTROL
P-85-256 0.75" 3 #12 XHHW-2 1 #12 XHHW-2 FR: DISC-85222 TO: PB-8522
3 #12 >> FV-85222 POWER
P-85-260 1" 3 #12 XHHW-2 1 #12 XHHW-2 FR: FV-85224
10 #14 XHHW-2 TO: PB-8522
3 #12 >> FV-85224 POWER
10 #14 >> FV-85224 CONTROL
P-85-261 0.75" 6 #12 XHHW-2 1 #12 XHHW-2 FR: DISC-85224 TO: PB-8522
6 #12 >> FV-85224 POWER
P-85-270 0.75" 3 #10 XHHW-2 1 #10 XHHW-2 FR: PB-8522 P-85-275 TO: CONDUIT TEE
3 #10 >> FCV-85221, FV-85222, FV-85224 POWER
P-85-275 0.75" 6 #10 XHHW-2 1 #10 XHHW-2 FR: CONDUIT TEE P-85-277 TO: PB-8501
3 #10 >> FCV-85221, FV-85222, FV-85224 POWER P-85-270
3 #10 >> FCV-85211, FV-85212, FV-85214 POWER P-85-170
P-85-277 0.75" 6 #10 XHHW-2 1 #10 XHHW-2 FR: PB-8501
TO: DP2
3 #10 >> FCV-85221, FV-85222, FV-85224 POWER P-85-275
3 #10 >> FCV-85211, FV-85212, FV-85214 POWER P-85-275
P-85-300 1" 3 #12 XHHW-2 1 #12 XHHW-2 FR: FV-85237 C-85-300 10 #14 XHHW-2 TO: PB-8513
3 #12 >> FV-85237 POWER
10 #14 >> FV-85237 CONTROL
P-85-301 0.75" 6 #12 XHHW-2 1 #12 XHHW-2 FR: DISC-85237 TO: PB-8513
6 #12 >> FV-85237 POWER
P-85-305 1" 3 #12 XHHW-2 1 #12 XHHW-2 FR: FCV-85238 C-85-300 8 #14 XHHW-2 TO: PB-8513
3 #12 >> FCV-85238 POWER
8 #14 >> FCV-85238 CONTROL
P-85-306 0.75" 6 #12 XHHW-2 1 #12 XHHW-2 FR: DISC-85238 TO: PB-8513
6 #12 >> FCV-85238 POWER
P-85-310 1" 3 #12 XHHW-2 1 #12 XHHW-2 FR: FV-85239 C-85-300 10 #14 XHHW-2 TO: PB-8513
3 #12 >> FV-85239 POWER
10 #14 >> FV-85239 CONTROL
P-85-311 0.75" 6 #12 XHHW-2 1 #12 XHHW-2 FR: DISC-85239 TO: PB-8513
6 #12 >> FV-85239 POWER
P-85-320 0.75" 3 #10 XHHW-2 1 #10 XHHW-2 FR: PB-8513 P-85-421 TO: CONDUIT TEE
3 #10 >> FV-85237, FCV-85238, FV-85239 POWER
P-85-350 1" 3 #12 XHHW-2 1 #12 XHHW-2 FR: FCV-85231
8 #14 XHHW-2 TO: PB-8523
3 #12 >> FCV-85231 POWER
8 #14 >> FCV-85231 CONTROL
P-85-351 0.75" 6 #12 XHHW-2 1 #12 XHHW-2 FR: DISC-85231 TO: PB-8523
6 #12 >> FCV-85231 POWER
July 12, 2023 - CONFORMED 16990-8 8660F10
CONDUIT SCHEDULE AREA ENGINEER HADI
RECYCLE WATER PROJECT REVISION
AWT BUILDING DATE 4/4/23
CONDUIT CONDUCTORS GROUND
NUMBER DWG SIZE # SIZE TYPE # SIZE TYPE DESCRIPTION CONNECTING
SEGMENTS
P-85-355 1" 3 #12 XHHW-2 1 #12 XHHW-2 FR: FV-85232
10 #14 XHHW-2 TO: PB-8521
3 #12 >> FV-85232 POWER
10 #14 >> FV-85232 CONTROL
P-85-356 0.75" 3 #12 XHHW-2 1 #12 XHHW-2 FR: DISC-85232 TO: PB-8523
3 #12 >> FV-85232 POWER
P-85-360 1" 3 #12 XHHW-2 1 #12 XHHW-2 FR: FV-85234
10 #14 XHHW-2 TO: PB-8523
3 #12 >> FV-85234 POWER
10 #14 >> FV-85234 CONTROL
P-85-361 0.75" 6 #12 XHHW-2 1 #12 XHHW-2 FR: DISC-85234 TO: PB-8523
6 #12 >> FV-85234 POWER
P-85-370 0.75" 3 #10 XHHW-2 1 #10 XHHW-2 FR: PB-8523 P-85-475 TO: CONDUIT TEE
3 #10 >> FCV-85231, FV-85232, FV-85234 POWER
P-85-400 1" 3 #12 XHHW-2 1 #12 XHHW-2 FR: FV-85247 C-85-400 10 #14 XHHW-2 TO: PB-8514
3 #12 >> FV-85247 POWER
10 #14 >> FV-85247 CONTROL
P-85-401 0.75" 3 #12 XHHW-2 1 #12 XHHW-2 FR: DISC-85247 TO: PB-8514
3 #12 >> FV-85247 POWER
P-85-405 1" 3 #12 XHHW-2 1 #12 XHHW-2 FR: FCV-85248 C-85-400 8 #14 XHHW-2 TO: PB-8514
3 #12 >> FCV-85248 POWER
8 #14 >> FCV-85248 CONTROL
P-85-406 0.75" 6 #12 XHHW-2 1 #12 XHHW-2 FR: DISC-85248 TO: PB-8514
6 #12 >> FCV-85248 POWER
P-85-410 1" 3 #12 XHHW-2 1 #12 XHHW-2 FR: FV-85249 C-85-400 10 #14 XHHW-2 TO: PB-8514
3 #12 >> FV-85249 POWER
10 #14 >> FV-85249 CONTROL
P-85-411 0.75" 6 #12 XHHW-2 1 #12 XHHW-2 FR: DISC-85249 TO: PB-8514
6 #12 >> FV-85249 POWER
P-85-420 0.75" 3 #10 XHHW-2 1 #10 XHHW-2 FR: PB-8514 P-85-421 TO: CONDUIT TEE
3 #10 >> FV-85247, FCV-85248, FV-85249 POWER
P-85-421 0.75" 6 #10 XHHW-2 1 #10 XHHW-2 FR: CONDUIT TEE P-85-422 TO: PB-8501
3 #10 >> FV-85247, FCV-85248, FV-85249 POWER P-85-420
3 #10 >> FV-85237, FCV-85238, FV-85239 POWER P-85-320
P-85-422 0.75" 6 #10 XHHW-2 1 #10 XHHW-2 FR: PB-8501
TO: DP2
3 #10 >> FV-85247, FCV-85248, FV-85249 POWER P-85-421
3 #10 >> FV-85237, FCV-85238, FV-85239 POWER P-85-421
P-85-450 1" 3 #12 XHHW-2 1 #12 XHHW-2 FR: FCV-85241
8 #14 XHHW-2 TO: PB-8524
3 #12 >> FCV-85241 POWER
8 #14 >> FCV-85241 CONTROL
P-85-451 0.75" 6 #12 XHHW-2 1 #12 XHHW-2 FR: DISC-85241 TO: PB-8524
6 #12 >> FCV-85241 POWER
P-85-455 1" 3 #12 XHHW-2 1 #12 XHHW-2 FR: FV-85242
10 #14 XHHW-2 TO: PB-8521
3 #12 >> FV-85242 POWER
10 #14 >> FV-85242 CONTROL
P-85-456 0.75" 3 #12 XHHW-2 1 #12 XHHW-2 FR: DISC-85242 TO: PB-8524
3 #12 >> FV-85242 POWER
July 12, 2023 - CONFORMED 16990-9 8660F10
CONDUIT SCHEDULE AREA ENGINEER HADI
RECYCLE WATER PROJECT REVISION
AWT BUILDING DATE 4/4/23
CONDUIT CONDUCTORS GROUND
NUMBER DWG SIZE # SIZE TYPE # SIZE TYPE DESCRIPTION CONNECTING
SEGMENTS
P-85-460 1" 3 #12 XHHW-2 1 #12 XHHW-2 FR: FV-85244
10 #14 XHHW-2 TO: PB-8524
3 #12 >> FV-85244 POWER
10 #14 >> FV-85244 CONTROL
P-85-461 0.75" 6 #12 XHHW-2 1 #12 XHHW-2 FR: DISC-85244 TO: PB-8524
6 #12 >> FV-85244 POWER
P-85-470 0.75" 3 #10 XHHW-2 1 #10 XHHW-2 FR: PB-8524 P-85-475 TO: CONDUIT TEE
3 #10 >> FCV-85241, FV-85242, FV-85244 POWER
P-85-475 0.75" 6 #10 XHHW-2 1 #10 XHHW-2 FR: CONDUIT TEE P-85-477 TO: PB-8501
3 #10 >> FCV-85231, FV-85232, FV-85234 POWER P-85-370
3 #10 >> FCV-85241, FV-85242, FV-85244 POWER P-85-470
P-85-477 1" 9 #10 XHHW-2 1 #10 XHHW-2 FR: PB-8501
TO: DP2
3 #10 >> FCV-85231, FV-85232, FV-85234 POWER P-85-475
3 #10 >> FCV-85241, FV-85242, FV-85244 POWER P-85-475
3 #10 >> FV-87130 POWER
P-85-501 1" 3 #6 XHHW-2 1 #8 XHHW-2 FR: BLO-85106
3 #12 XHHW-2 TO: MCC-C
3 #12 >> FAN-85109 POWER
3 #6 >> BLO-85106 POWER
P-85-511 1" 3 #6 XHHW-2 1 #8 XHHW-2 FR: BLO-85107
3 #12 XHHW-2 TO: MCC-C
3 #12 >> FAN-85110 POWER
3 #6 >> BLO-85107 POWER
P-85-521 1" 3 #6 XHHW-2 1 #8 XHHW-2 FR: BLO-85108
3 #12 XHHW-2 TO: MCC-C
3 #12 >> FAN-85111 POWER
3 #6 >> BLO-85108 POWER
P-85-610 0.75" 5 #12 XHHW-2 1 #12 XHHW-2 FR: PMP-85104 C-85-612 2 #14 XHHW-2 TO: JUNCTION BOX
3 #12 >> PMP-85104 POWER
2 #12 >> PMP-85104 MWH
2 #14 >> PMP-85104 TSH
P-85-612 0.75" 3 #12 XHHW-2 1 #12 XHHW-2 FR: JUNCTION BOX TO: MCC-C
3 #12 >> PMP-85104 POWER
P-85-710 1.5" 3 #2 XHHW-2 1 #8 XHHW-2 FR: DP2
TO: MCC-C
3 #2 >> DP2 POWER
S-85-100 0.75" 1 2/CS-#16 1 #14 XHHW-2 FR: LIT-85211 S-85-110 TO: JUNCTION BOX
1 2/CS-#16 >> LIT-85211 SIGNAL
S-85-105 0.75" 2 2/CS-#16 1 #14 XHHW-2 FR: FCV-85218 S-85-110 TO: JUNCTION BOX
2 2/CS-#16 >> FCV-85218 SIGNAL
S-85-110 1" 3 2/CS-#16 1 #14 XHHW-2 FR: JUNCTION BOX S-85-211 TO: CONDUIT TEE
2 2/CS-#16 >> FCV-85218 SIGNAL S-85-105
1 2/CS-#16 >> LIT-85211 SIGNAL S-85-100
S-85-150 0.75" 2 2/CS-#16 1 #14 XHHW-2 FR: FCV-85211 S-85-170 TO: JUNCTION BOX
2 2/CS-#16 >> FCV-85211 SIGNAL
S-85-170 0.75" 2 2/CS-#16 1 #14 XHHW-2 FR: JUNCTION BOX S-85-271 TO: CONDUIT TEE
2 2/CS-#16 >> FCV-85211 SIGNAL S-85-150
S-85-200 0.75" 1 2/CS-#16 1 #14 XHHW-2 FR: LIT-85221 S-85-210 TO: JUNCTION BOX
1 2/CS-#16 >> LIT-85221 SIGNAL
S-85-205 0.75" 2 2/CS-#16 1 #14 XHHW-2 FR: FCV-85228 S-85-210 TO: JUNCTION BOX
2 2/CS-#16 >> FCV-85228 SIGNAL
July 12, 2023 - CONFORMED 16990-10 8660F10
CONDUIT SCHEDULE AREA ENGINEER HADI
RECYCLE WATER PROJECT REVISION
AWT BUILDING DATE 4/4/23
CONDUIT CONDUCTORS GROUND
NUMBER DWG SIZE # SIZE TYPE # SIZE TYPE DESCRIPTION CONNECTING
SEGMENTS
S-85-210 1" 3 2/CS-#16 1 #14 XHHW-2 FR: JUNCTION BOX S-85-211 TO: CONDUIT TEE
2 2/CS-#16 >> FCV-85228 SIGNAL S-85-205
1 2/CS-#16 >> LIT-85221 SIGNAL S-85-200
S-85-211 1.5" 6 2/CS-#16 1 #14 XHHW-2 FR: CONDUIT TEE S-85-311 TO: CONDUIT TEE
2 2/CS-#16 >> FCV-85218 SIGNAL S-85-110
1 2/CS-#16 >> LIT-85211 SIGNAL S-85-110
2 2/CS-#16 >> FCV-85228 SIGNAL S-85-210
1 2/CS-#16 >> LIT-85221 SIGNAL S-85-210
S-85-250 0.75" 2 2/CS-#16 1 #14 XHHW-2 FR: FCV-85221 S-85-270 TO: JUNCTION BOX
2 2/CS-#16 >> FCV-85221 SIGNAL
S-85-270 0.75" 2 2/CS-#16 1 #14 XHHW-2 FR: JUNCTION BOX S-85-271 TO: CONDUIT TEE
2 2/CS-#16 >> FCV-85221 SIGNAL S-85-250
S-85-271 1" 4 2/CS-#16 1 #14 XHHW-2 FR: CONDUIT TEE
TO: CONDUIT TEE
2 2/CS-#16 >> FCV-85211 SIGNAL S-85-170
2 2/CS-#16 >> FCV-85221 SIGNAL S-85-270
S-85-300 0.75" 1 2/CS-#16 1 #14 XHHW-2 FR: LIT-85231 S-85-310 TO: JUNCTION BOX
1 2/CS-#16 >> LIT-85231 SIGNAL
S-85-305 0.75" 2 2/CS-#16 1 #14 XHHW-2 FR: FCV-85238 S-85-310 TO: JUNCTION BOX
2 2/CS-#16 >> FCV-85238 SIGNAL
S-85-310 1" 3 2/CS-#16 1 #14 XHHW-2 FR: JUNCTION BOX S-85-311 TO: CONDUIT TEE
2 2/CS-#16 >> FCV-85238 SIGNAL S-85-305
1 2/CS-#16 >> LIT-85231 SIGNAL S-85-300
S-85-311 1.5" 9 2/CS-#16 1 #14 XHHW-2 FR: CONDUIT TEE S-85-411 TO: CONDUIT TEE
2 2/CS-#16 >> FCV-85218 SIGNAL S-85-211
1 2/CS-#16 >> LIT-85211 SIGNAL S-85-211
2 2/CS-#16 >> FCV-85228 SIGNAL S-85-211
1 2/CS-#16 >> LIT-85221 SIGNAL S-85-211
2 2/CS-#16 >> FCV-85238 SIGNAL S-85-310
1 2/CS-#16 >> LIT-85231 SIGNAL S-85-310
S-85-350 0.75" 2 2/CS-#16 1 #14 XHHW-2 FR: FCV-85231 S-85-370 TO: JUNCTION BOX
2 2/CS-#16 >> FCV-85231 SIGNAL
S-85-370 0.75" 2 2/CS-#16 1 #14 XHHW-2 FR: JUNCTION BOX S-85-371 TO: CONDUIT TEE
2 2/CS-#16 >> FCV-85231 SIGNAL S-85-350
S-85-371 1.5" 6 2/CS-#16 1 #14 XHHW-2 FR: CONDUIT TEE S-85-471 TO: CONDUIT TEE
2 2/CS-#16 >> FCV-85211 SIGNAL P-85-271
2 2/CS-#16 >> FCV-85221 SIGNAL P-85-271
2 2/CS-#16 >> FCV-85231 SIGNAL S-85-370
S-85-400 0.75" 1 2/CS-#16 1 #14 XHHW-2 FR: LIT-85241 S-85-410 TO: JUNCTION BOX
1 2/CS-#16 >> LIT-85241 SIGNAL
S-85-405 0.75" 2 2/CS-#16 1 #14 XHHW-2 FR: FCV-85248 S-85-410 TO: JUNCTION BOX
2 2/CS-#16 >> FCV-85248 SIGNAL
S-85-410 1" 3 2/CS-#16 1 #14 XHHW-2 FR: JUNCTION BOX S-85-411 TO: CONDUIT TEE
2 2/CS-#16 >> FCV-85248 SIGNAL S-85-405
1 2/CS-#16 >> LIT-85241 SIGNAL S-85-400
July 12, 2023 - CONFORMED 16990-11 8660F10
CONDUIT SCHEDULE AREA ENGINEER HADI
RECYCLE WATER PROJECT REVISION
AWT BUILDING DATE 4/4/23
CONDUIT CONDUCTORS GROUND
NUMBER DWG SIZE # SIZE TYPE # SIZE TYPE DESCRIPTION CONNECTING
SEGMENTS
S-85-411 2" 12 2/CS-#16 1 #14 XHHW-2 FR: CONDUIT TEE S-85-415 TO: PB-8502
2 2/CS-#16 >> FCV-85218 SIGNAL S-85-311
1 2/CS-#16 >> LIT-85211 SIGNAL S-85-311
2 2/CS-#16 >> FCV-85228 SIGNAL S-85-311
1 2/CS-#16 >> LIT-85221 SIGNAL S-85-311
2 2/CS-#16 >> FCV-85238 SIGNAL S-85-311
1 2/CS-#16 >> LIT-85231 SIGNAL S-85-311
2 2/CS-#16 >> FCV-85248 SIGNAL S-85-410
1 2/CS-#16 >> LIT-85241 SIGNAL S-85-410
S-85-415 2" 12 2/CS-#16 1 #14 XHHW-2 FR: PB-8502
TO: VCP-3
2 2/CS-#16 >> FCV-85218 SIGNAL S-85-411
1 2/CS-#16 >> LIT-85211 SIGNAL S-85-411
2 2/CS-#16 >> FCV-85228 SIGNAL S-85-411
1 2/CS-#16 >> LIT-85221 SIGNAL S-85-411
2 2/CS-#16 >> FCV-85238 SIGNAL S-85-411
1 2/CS-#16 >> LIT-85231 SIGNAL S-85-411
2 2/CS-#16 >> FCV-85248 SIGNAL S-85-411
1 2/CS-#16 >> LIT-85241 SIGNAL S-85-411
S-85-450 0.75" 2 2/CS-#16 1 #14 XHHW-2 FR: FCV-85241 S-85-470 TO: JUNCTION BOX
2 2/CS-#16 >> FCV-85241 SIGNAL
S-85-470 0.75" 2 2/CS-#16 1 #14 XHHW-2 FR: JUNCTION BOX S-85-471 TO: CONDUIT TEE
2 2/CS-#16 >> FCV-85241 SIGNAL S-85-450
S-85-471 1.5" 8 2/CS-#16 1 #14 XHHW-2 FR: CONDUIT TEE S-85-475 TO: PB-8502
2 2/CS-#16 >> FCV-85211 SIGNAL S-85-371
2 2/CS-#16 >> FCV-85221 SIGNAL S-85-371
2 2/CS-#16 >> FCV-85231 SIGNAL S-85-371
2 2/CS-#16 >> FCV-85241 SIGNAL S-85-470
S-85-475 1.5" 8 2/CS-#16 1 #14 XHHW-2 FR: PB-8502
TO: VCP-3
2 2/CS-#16 >> FCV-85211 SIGNAL S-85-471
2 2/CS-#16 >> FCV-85221 SIGNAL S-85-471
2 2/CS-#16 >> FCV-85231 SIGNAL S-85-471
2 2/CS-#16 >> FCV-85241 SIGNAL S-85-471
S-85-510 0.75" 1 2/CS-#16 1 #14 XHHW-2 FR: PIT-85106 S-85-540 TO: JUNCTION BOX
1 2/CS-#16 >> PIT-85106 SIGNAL
S-85-520 0.75" 1 2/CS-#16 1 #14 XHHW-2 FR: PIT-85107 S-85-540 TO: JUNCTION BOX
1 2/CS-#16 >> PIT-85107 SIGNAL
S-85-530 0.75" 1 2/CS-#16 1 #14 XHHW-2 FR: PIT-85108 S-85-540 TO: JUNCTION BOX
1 2/CS-#16 >> PIT-85108 SIGNAL
S-85-540 1" 3 2/CS-#16 1 #14 XHHW-2 FR: JUNCTION BOX
TO: VCP-3
1 2/CS-#16 >> PIT-85108 SIGNAL S-85-530
1 2/CS-#16 >> PIT-85107 SIGNAL S-85-520
1 2/CS-#16 >> PIT-85106 SIGNAL S-85-510
C-87-100 0.75" 6 #14 XHHW-2 1 #14 XHHW-2 FR: LCP-87134
TO: JUNCTION BOX
6 #14 >> LCP-87134 CONTROL
C-87-101 2" 2 #12 XHHW-2 1 #12 XHHW-2 FR: JUNCTION BOX C-87-115 8 #14 XHHW-2 TO: PB-8530
2 #14 >> PMP-87134 TSH
2 #12 >> PMP-87134 MWH
6 #14 >> LCP-87134 CONTROL
C-87-105 0.75" 1 MFR CABLE 1 #14 XHHW-2 FR: VCP-87130
TO: FV-87130
1 MFR >> VCP-87130 CONTROL
C-87-110 2" 10 #14 XHHW-2 1 #14 XHHW-2 FR: FV-87130 C-87-115 TO: PB-8530
10 #14 >> FV-87130 CONTROL
July 12, 2023 - CONFORMED 16990-12 8660F10
CONDUIT SCHEDULE AREA ENGINEER HADI
RECYCLE WATER PROJECT REVISION
AWT BUILDING DATE 4/4/23
CONDUIT CONDUCTORS GROUND
NUMBER DWG SIZE # SIZE TYPE # SIZE TYPE DESCRIPTION CONNECTING
SEGMENTS
C-87-115 1.5" 2 #12 XHHW-2 1 #12 XHHW-2 FR: PB-8530 C-87-117 18 #14 XHHW-2 TO: PB-8501
10 #14 >> FV-87130 CONTROL C-87-110
2 #14 >> PMP-87134 TSH C-87-101
2 #12 >> PMP-87134 MWH C-87-101
6 #14 >> LCP-87134 CONTROL C-87-101
C-87-117 0.75" 2 #12 XHHW-2 1 #12 XHHW-2 FR: PB-8501
8 #14 XHHW-2 TO: MCC-C
2 #14 >> PMP-87134 TSH C-87-115
2 #12 >> PMP-87134 MWH C-87-115
6 #14 >> LCP-87134 CONTROL C-87-115
C-87-119 0.75" 10 #14 XHHW-2 1 #14 XHHW-2 FR: MCC-C
TO: PLC-4
10 #14 >> PMP-87134 CONTROL
P-87-100 0.75" 3 #10 XHHW-2 1 #10 XHHW-2 FR: PMP-87134
2 #12 XHHW-2 TO: JUNCTION BOX
2 #14 XHHW-2 3 #10 >> PMP-87134 POWER
2 #14 >> PMP-87134 TSH
2 #12 >> PMP-87134 MWH
P-87-101 2" 3 #10 XHHW-2 1 #10 XHHW-2 FR: JUNCTION BOX P-87-115 TO: PB-8530
3 #10 >> PMP-87134 POWER
P-87-110 0.75" 3 #10 XHHW-2 1 #10 XHHW-2 FR: FV-87130
TO: JUNCTION BOX
3 #10 >> FV-87130 POWER
P-87-112 2" 7 #10 XHHW-2 1 #10 XHHW-2 FR: JUNCTION BOX P-87-115 TO: PB-8530
2 #10 >> FIT-88101 POWER L-88-101
2 #10 >> FIT-88102 POWER L-88-102
3 #10 >> FV-87130 POWER P-88-100
P-87-115 1" 10 #10 XHHW-2 1 #10 XHHW-2 FR: PB-8530
TO: PB-8501
3 #10 >> PMP-87134 POWER P-87-101
2 #10 >> FIT-88101 POWER P-87-112
2 #10 >> FIT-88102 POWER P-87-112
3 #10 >> FV-87130 POWER P-87-112
P-87-117 0.75" 3 #10 XHHW-2 1 #10 XHHW-2 FR: PB-8501
TO: MCC-C
3 #10 >> PMP-87134 POWER
S-87-100 2" 1 2/CS-#16 1 #14 XHHW-2 FR: AIT-87130 S-88-110 TO: PB-8535
1 2/CS-#16 >> AIT-87130 SIGNAL
L-88-101 0.75" 2 #10 XHHW-2 1 #10 XHHW-2 FR: FIT-88101 P-87-112 TO: JUNCTION BOX
2 #10 >> FIT-88101 POWER
L-88-102 0.75" 2 #10 XHHW-2 1 #10 XHHW-2 FR: FIT-88102 P-87-112 TO: JUNCTION BOX
2 #10 >> FIT-88102 POWER
L-88-105 0.75" 4 #10 XHHW-2 1 #10 XHHW-2 FR: PB-8501
TO: PLC-4
2 #10 >> FIT-88101 POWER
2 #10 >> FIT-88102 POWER
S-88-101 0.75" 1 2/CS-#16 1 #14 XHHW-2 FR: FIT-88101 S-88-105 TO: JUNCTION BOX
1 2/CS-#16 >> FIT-88101 SIGNAL
S-88-102 0.75" 1 2/CS-#16 1 #14 XHHW-2 FR: FIT-88102 S-88-105 TO: JUNCTION BOX
1 2/CS-#16 >> FIT-88102 SIGNAL
S-88-105 2" 2 2/CS-#16 1 #14 XHHW-2 FR: JUNCTION BOX S-88-110 TO: PB-8535
1 2/CS-#16 >> FIT-88102 SIGNAL S-88-102
1 2/CS-#16 >> FIT-88101 SIGNAL S-88-101
S-88-110 1" 3 2/CS-#16 1 #14 XHHW-2 FR: PB-8535 S-88-112 TO: PB-8502
1 2/CS-#16 >> AIT-87130 SIGNAL S-87-100
1 2/CS-#16 >> FIT-88102 SIGNAL S-88-105
1 2/CS-#16 >> FIT-88101 SIGNAL S-88-105
July 12, 2023 - CONFORMED 16990-13 8660F10
CONDUIT SCHEDULE AREA ENGINEER HADI
RECYCLE WATER PROJECT REVISION
AWT BUILDING DATE 4/4/23
CONDUIT CONDUCTORS GROUND
NUMBER DWG SIZE # SIZE TYPE # SIZE TYPE DESCRIPTION CONNECTING
SEGMENTS
S-88-112 1" 3 2/CS-#16 1 #14 XHHW-2 FR: PB-8502
TO: PLC-4
1 2/CS-#16 >> AIT-87130 SIGNAL S-88-110
1 2/CS-#16 >> FIT-88102 SIGNAL S-88-110
1 2/CS-#16 >> FIT-88101 SIGNAL S-88-110
END OF CONDUIT SCHEDULE
END OF SECTION
July 12, 2023 - CONFORMED 16990-14 8660F10
PART 1 GENERAL
1.01 SUMMARY
A. Conduit requirements:
1. As defined in Section 16050 and Section 16130.
B. Cable requirements and definitions:
1. As defined in Section 16050 and Section 16123.
2. 2/CS#16: 2 conductor, 16 gauge, twisted shielded pair.
3. 3/CS#16: 3 conductor, 16 gauge, twisted shielded triplet.
4. */C#Y: Multiconductor cable (* indicates number of
conductors, Y indicates conductor size and insulation).
5. */FO: Fiber optic (* indicates strand count).
6. CAT6: Category 6 Ethernet cable.
7. MFR: Manufacturer or vendor furnished cable.
8. PULL: Pull Rope.
9. VFD: Shielded VFD cable with integral ground.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
3.01 CONDUIT SCHEDULE
A. Conduit Schedule is presented on the following pages.
SECTION 16990
CONDUIT SCHEDULE
AREA WWTP Pump Stations
July 12, 2023 - CONFORMED 16990-1 8660F10
CONDUIT SCHEDULE AREA ENGINEER HR
Ukiah Recycle Water Project REVISION
Waste Water Treatment Plant DATE 4/4/23
CONDUIT CONDUCTORS GROUND
NUMBER DWG SIZE # SIZE TYPE # SIZE TYPE DESCRIPTION CONNECTING
SEGMENTS
C-60-100 0.75" 1 MFR CABLE 1 #14 XHHW-2 FR: CONDUIT TEE TO: LCP-60102
1 MFR >> LCP-60102 CONTROL P-60-100
C-60-105 0.75" 1 MFR CABLE 1 #14 XHHW-2 FR: CONDUIT TEE TO: LCP-60100
1 MFR >> LCP-60100 CONTROL P-60-105
L-60-109 0.75" 2 #14 XHHW-2 1 #14 XHHW-2 FR: NJB-60001 L-60-111 TO: PB-6001
2 #14 >> NETWORK COMM'S POWER
L-60-110 0.75" 4 #10 XHHW-2 1 #10 XHHW-2 FR: DECNLORINATION LIGHTING AND RECEPT. L-60-111 TO: PB-6001
4 #10 >> DECNLORINATION LIGHTING AND RECEPT.
L-60-111 2" 4 #10 XHHW-2 1 #10 XHHW-2 FR: PB-6001
2 #14 XHHW-2 1 #14 XHHW-2 TO: PB-8901
4 #10 >> DECNLORINATION LIGHTING AND RECEPT. L-60-110
2 #14 >> NJB-60001
N-60-100 0.75" 1 CAT6 1 #14 XHHW-2 FR: FV-60102
TO: NJB-60001
1 CAT6 >> FV-60102 NETWORK
N-60-105 1" 1 CAT6 1 #14 XHHW-2 FR: FV-60100
TO: NJB-60001
1 CAT6 >> FV-60100 NETWORK
N-60-110 2" 1 12/FO 1 #14 XHHW-2 FR: NJB-60001 N-60-111 TO: PB-8901
1 12/FO >> NJB-60001 NETWORK
N-60-111 2" 1 12/FO 1 #14 XHHW-2 FR: PB-8901 N-60-112
TO: HH-11
1 12/FO >> NJB-60001 NETWORK N-60-110
N-60-112 2" 1 12/FO 1 #14 XHHW-2 FR: HH-11 N-60-113
TO: HH-13
1 12/FO >> NJB-60001 NETWORK N-60-111
N-60-113 2" 1 12/FO 1 #14 XHHW-2 FR: HH-13 N-60-114
TO: PB-7002
1 12/FO >> NJB-60001 NETWORK N-60-112
N-60-114 2" 1 12/FO 1 #14 XHHW-2 FR: PB-7002
TO: PLC70299
1 12/FO >> NJB-60001 NETWORK N-60-113
P-60-100 0.75" 3 #10 XHHW-2 1 #10 XHHW-2 FR: FV-60102 C-60-100 1 MFR TO: CONDUIT TEE
3 #10 >> FV-60102 POWER
1 MFR >> LCP-60102 CONTROL
P-60-101 0.75" 3 #10 XHHW-2 1 #10 XHHW-2 FR: CONDUIT TEE P-60-102 TO: DISC-60102
3 #10 >> FV-60102 POWER
P-60-102 0.75" 3 #10 XHHW-2 1 #10 XHHW-2 FR: DISC-60102 P-60-120 TO: PB-6001
3 #10 >> FV-60102 POWER P-60-101
P-60-105 1" 3 #10 XHHW-2 1 #10 XHHW-2 FR: FV-60100 C-60-105 1 MFR CABLE TO: CONDUIT TEE
3 #10 >> FV-60100 POWER
1 MFR >> LCP-60100 CONTROL
P-60-106 0.75" 3 #10 XHHW-2 1 #10 XHHW-2 FR: CONDUIT TEE TO: DISC-60100
3 #10 >> FV-60100 POWER
P-60-107 0.75" 3 #10 XHHW-2 1 #10 XHHW-2 FR: DISC-60100 P-60-120 TO: PB-6001
3 #10 >> FV-60100 POWER
P-60-120 2" 6 #10 XHHW-2 1 #10 XHHW-2 FR: PB-6001 P-89-131 TO: PB-8901
3 #10 >> FV-60100 POWER P-60-107
3 #10 >> FV-60102 POWER P-60-102
X-60-100 2" 1 PULL ROPE FR: CONDUIT STUBUP-DECHLOR STRUCTURE TO: CONDUIT STUBUP-CAROUSEL PS
1 PULL >> SPARE
July 12, 2023 - CONFORMED 16990-2 8660F10
CONDUIT SCHEDULE AREA ENGINEER HR
Ukiah Recycle Water Project REVISION
Waste Water Treatment Plant DATE 4/4/23
CONDUIT CONDUCTORS GROUND
NUMBER DWG SIZE # SIZE TYPE # SIZE TYPE DESCRIPTION CONNECTING
SEGMENTS
X-60-105 2" 1 PULL ROPE FR: CONDUIT STUBUP-DECHLOR STRUCTURE TO: CONDUIT STUBUP-CAROUSEL PS
1 PULL >> SPARE
N-70-100 0.75" 1 CAT6 1 #14 XHHW-2 FR: VFD-91100 N-70-104 TO: JUNCTION BOX
1 CAT6 >> VFD-91100 NETWORK
N-70-101 0.75" 1 CAT6 1 #14 XHHW-2 FR: VFD-89102 N-70-104 TO: JUNCTION BOX
1 CAT6 >> VFD-89102 NETWORK
N-70-102 0.75" 1 CAT6 1 #14 XHHW-2 FR: VFD-89101 N-70-104 TO: JUNCTION BOX
1 CAT6 >> VFD-89101 NETWORK
N-70-103 0.75" 1 CAT6 1 #14 XHHW-2 FR: VFD-89100 N-70-104 TO: JUNCTION BOX
1 CAT6 >> VFD-89100 NETWORK
N-70-104 1.5" 4 CAT6 1 #14 XHHW-2 FR: JUNCTION BOX
TO: PLC70299
1 CAT6 >> VFD-89100 NETWORK N-70-103
1 CAT6 >> VFD-89101 NETWORK N-70-102
1 CAT6 >> VFD-89102 NETWORK N-70-101
1 CAT6 >> VFD-91100 NETWORK N-70-100
S-80-100 0.75" 1 2/CS-#16 1 #14 XHHW-2 FR: LIT-80100 S-80-101 TO: PB-8001
1 2/CS-#16 >> LIT-80100 SIGNAL
S-80-101 2" 1 2/CS-#16 1 #14 XHHW-2 FR: PB-8001
TO: PLC70299
1 2/CS-#16 >> LIT-80100 SIGNAL S-80-100
X-80-100 2" 1 PULL ROPE FR: PB-8001
TO: STUB UP
1 PULL >> SPARE
X-80-101 2" 1 PULL ROPE FR: PB-8001
TO: STUB UP
1 PULL >> SPARE
C-89-100 0.75" 3 #14 XHHW-2 1 #14 XHHW-2 FR: FSL-89102 C-89-102 TO: JUNCTION BOX
3 #14 >> FSL-89102 CONTROL
C-89-101 0.75" 5 #14 XHHW-2 1 #14 XHHW-2 FR: LCP-89102 C-89-102 1 3/CS-#16 TO: JUNCTION BOX
5 #14 >> LCP-89102 CONTROL
1 3/CS-#16 >> LCP-89102 SPEED CONTROL
C-89-102 1" 8 #14 XHHW-2 1 #14 XHHW-2 FR: JUNCTION BOX C-89-108 1 3/CS-#16 TO: CONDUIT TEE
5 #14 >> LCP-89102 CONTROL C-89-101
1 3/CS-#16 >> LCP-89102 SPEED CONTROL C-89-101
3 #14 >> FSL-89102 CONTROL C-89-100
C-89-106 0.75" 2 MFR CABLE 1 #14 XHHW-2 FR: LSLL-89100/LSHH-89100 TO: JUNCTION BOX
1 MFR >> LSLL-89100 CONTROL
1 MFR >> LSHH-89100 CONTROL
C-89-107 0.75" 4 #14 XHHW-2 1 #14 XHHW-2 FR: JUNCTION BOX C-89-108 TO: CONDUIT TEE
2 #14 >> LSLL-89100 CONTROL
2 #14 >> LSHH-89100 CONTROL
C-89-108 1" 12 #14 XHHW-2 1 #14 XHHW-2 FR: CONDUIT TEE C-89-113 1 3/CS-#16 TO: JUNCTION BOX
2 #14 >> LSLL-89100 CONTROL C-89-107
2 #14 >> LSHH-89100 CONTROL C-89-107
5 #14 >> LCP-89102 CONTROL C-89-102
1 3/CS-#16 >> LCP-89102 SPEED CONTROL C-89-102
3 #14 >> FSL-89102 CONTROL C-89-102
C-89-110 0.75" 3 #14 XHHW-2 1 #14 XHHW-2 FR: FSL-89101 C-89-113 TO: JUNCTION BOX
3 #14 >> FSL-89101 CONTROL
July 12, 2023 - CONFORMED 16990-3 8660F10
CONDUIT SCHEDULE AREA ENGINEER HR
Ukiah Recycle Water Project REVISION
Waste Water Treatment Plant DATE 4/4/23
CONDUIT CONDUCTORS GROUND
NUMBER DWG SIZE # SIZE TYPE # SIZE TYPE DESCRIPTION CONNECTING
SEGMENTS
C-89-111 0.75" 5 #14 XHHW-2 1 #14 XHHW-2 FR: LCP-89101 C-89-113 1 3/CS-#16 TO: JUNCTION BOX
5 #14 >> LCP-89101 CONTROL
1 3/CS-#16 >> LCP-89101 SPEED CONTROL
C-89-113 1.5" 20 #14 XHHW-2 1 #14 XHHW-2 FR: JUNCTION BOX C-89-120 2 3/CS-#16 TO: JUNCTION BOX
5 #14 >> LCP-89101 CONTROL C-89-111
1 3/CS-#16 >> LCP-89101 SPEED CONTROL C-89-111
3 #14 >> FSL-89101 CONTROL C-89-110
2 #14 >> LSLL-89100 CONTROL C-89-108
2 #14 >> LSHH-89100 CONTROL C-89-108
5 #14 >> LCP-89102 CONTROL C-89-108
1 3/CS-#16 >> LCP-89102 SPEED CONTROL C-89-108
3 #14 >> FSL-89102 CONTROL C-89-108
C-89-115 0.75" 3 #14 XHHW-2 1 #14 XHHW-2 FR: FSL-89100 C-89-120 TO: JUNCTION BOX
3 #14 >> FSL-89100 CONTROL
C-89-116 0.75" 5 #14 XHHW-2 1 #14 XHHW-2 FR: LCP-89100 C-89-120 1 3/CS-#16 TO: JUNCTION BOX
5 #14 >> LCP-89100 CONTROL
1 3/CS-#16 >> LCP-89100 SPEED CONTROL
C-89-120 2" 15 #12 XHHW-2 1 #12 XHHW-2 FR: JUNCTION BOX C-89-130 25 #14 XHHW-2 TO: JUNCTION BOX
3 3/CS-#16 5 #14 >> LCP-89100 CONTROL C-89-116
1 3/CS-#16 >> LCP-89100 SPEED CONTROL C-89-116
3 #12 >> FSL-89100 POWER/CONTROL C-89-115
5 #14 >> LCP-89101 CONTROL C-89-113
1 3/CS-#16 >> LCP-89101 SPEED CONTROL C-89-113
3 #12 >> FSL-89101 POWER/CONTROL C-89-113
2 #14 >> LSLL-89100 CONTROL C-89-113
2 #14 >> LSHH-89100 CONTROL C-89-113
5 #14 >> LCP-89102 CONTROL C-89-113
1 3/CS-#16 >> LCP-89102 SPEED CONTROL C-89-113
3 #12 >> FSL-89102 POWER/CONTROL C-89-113
2 #14 >> PMP-89100 TSH P-89-100
2 #12 >> PMP-89100 MWH P-89-100
2 #14 >> PMP-89101 TSH P-89-110
2 #12 >> PMP-89101 MWH P-89-110
2 #14 >> PMP-89102 TSH P-89-120
2 #12 >> PMP-89102 MWH P-89-120
C-89-130 1" 5 #12 XHHW-2 1 #12 XHHW-2 FR: JUNCTION BOX
7 #14 XHHW-2 TO: VFD-89100
1 3/CS-#16 5 #14 >> LCP-89100 CONTROL C-89-120
1 3/CS-#16 >> LCP-89100 SPEED CONTROL C-89-120
3 #12 >> FSL-89100 POWER/CONTROL C-89-120
2 #14 >> PMP-89100 TSH C-89-120
2 #12 >> PMP-89100 MWH C-89-120
C-89-131 1" 5 #12 XHHW-2 1 #12 XHHW-2 FR: JUNCTION BOX
7 #14 XHHW-2 TO: VFD-89101
1 3/CS-#16 5 #14 >> LCP-89101 CONTROL C-89-120
1 3/CS-#16 >> LCP-89101 SPEED CONTROL C-89-120
3 #12 >> FSL-89101 POWER/CONTROL C-89-120
2 #14 >> PMP-89101 TSH C-89-120
2 #12 >> PMP-89101 MWH C-89-120
C-89-132 1" 5 #12 XHHW-2 1 #12 XHHW-2 FR: JUNCTION BOX
7 #14 XHHW-2 TO: VFD-89102
1 3/CS-#16 5 #14 >> LCP-89102 CONTROL C-89-120
1 3/CS-#16 >> LCP-89102 SPEED CONTROL C-89-120
3 #12 >> FSL-89102 POWER/CONTROL C-89-120
2 #14 >> PMP-89102 TSH C-89-120
2 #12 >> PMP-89102 MWH C-89-120
C-89-140 0.75" 4 #14 XHHW-2 1 #14 XHHW-2 FR: JUNCTION BOX TO: PLC70299
2 #14 >> LSLL-89100 CONTROL
2 #14 >> LSHH-89100 CONTROL
L-89-110 0.75" 4 #10 XHHW-2 1 #10 XHHW-2 FR: CAROUSEL PUMP STATION LIGHTING AND RECEP.
TO: PB-8901
4 #10 >> AREA 89 LIGHTING AND RECEPTACLE
L-89-111 2" 4 #8 XHHW-2 1 #10 XHHW-2 FR: PB-8901
2 #14 XHHW-2 1 #14 XHHW-2 TO: HH-10
4 #8 >> AREA 89 & 60 LTG. AND RECPT.
2 #14 >> NJB-60001
July 12, 2023 - CONFORMED 16990-4 8660F10
CONDUIT SCHEDULE AREA ENGINEER HR
Ukiah Recycle Water Project REVISION
Waste Water Treatment Plant DATE 4/4/23
CONDUIT CONDUCTORS GROUND
NUMBER DWG SIZE # SIZE TYPE # SIZE TYPE DESCRIPTION CONNECTING
SEGMENTS
L-89-112 2" 4 #6 XHHW-2 1 #8 XHHW-2 FR: HH-10 L-89-113
2 #14 XHHW-2 1 #14 XHHW-2 TO: MH-12
4 #6 >> AREA 89 & 60 & 91 LTG. AND RECPT.
2 #14 >> NJB-60001
L-89-113 2" 4 #6 XHHW-2 1 #8 XHHW-2 FR: MH-12 L-89-114
2 #14 XHHW-2 1 #14 XHHW-2 TO: PB-7001
4 #6 >> AREA 89 & 60 & 91 LTG. AND RECPT. L-89-112
2 #14 >> NJB-60001
L-89-114 1.5" 4 #6 XHHW-2 1 #8 XHHW-2 FR: PB-7001
2 #14 XHHW-2 1 #14 XHHW-2 TO: MCC70291
4 #6 >> AREA 89 & 60 & 91 LTG. AND RECPT. L-89-113
2 #14 >> NJB-60001
L-89-120 0.75" 2 #10 XHHW-2 1 #10 XHHW-2 FR: DISCONNECT P-89-131 TO: PB-8901
2 #10 >> FIT-99105 POWER
P-89-100 2" 1 3/C-#4:VFD VFD INTEGRAL FR: PMP-89100 C-89-120 2 #12 XHHW-2 TO: PB-8901
2 #14 XHHW-2 1 3/C-#4:VFD >> PMP-89100 POWER
2 #14 >> PMP-89100 TSH
2 #12 >> PMP-89100 MWH
P-89-101 2" 1 3/C-#4:VFD VFD INTEGRAL FR: PB-8901
TO: VFD-89100
1 3/C-#4:VFD >> PMP-89100 POWER P-89-100
P-89-105 1" 3 #6 XHHW-2 1 #8 XHHW-2 FR: VFD-89100
TO: MCC70291
3 #6 >> VFD-89100 POWER
P-89-110 1.5" 1 3/C-#6:VFD VFD INTEGRAL FR: PMP-89101 C-89-120 2 #12 XHHW-2 TO: PB-8901
2 #14 XHHW-2 1 3/C-#6:VFD >> PMP-89101 POWER
2 #14 >> PMP-89101 TSH
2 #12 >> PMP-89101 MWH
P-89-111 2" 1 3/C-#6:VFD VFD INTEGRAL FR: PB-8901
TO: VFD-89101
1 3/C-#6:VFD >> PMP-89101 POWER P-89-110
P-89-115 1" 3 #6 XHHW-2 1 #8 XHHW-2 FR: VFD-89101
TO: MCC70292
3 #6 >> VFD-89101 POWER
P-89-120 1.5" 1 3/C-#6:VFD VFD INTEGRAL FR: PMP-89102 C-89-120 2 #12 XHHW-2 TO: PB-8901
2 #14 XHHW-2 1 3/C-#6:VFD >> PMP-89102 POWER
2 #14 >> PMP-89102 TSH
2 #12 >> PMP-89102 MWH
P-89-121 2" 1 3/C-#6:VFD VFD INTEGRAL FR: PB-8901
TO: VFD-89102
1 3/C-#6:VFD >> PMP-89102 POWER P-89-120
P-89-125 1" 3 #6 XHHW-2 1 #8 XHHW-2 FR: VFD-89102
TO: MCC70293
3 #6 >> VFD-89102 POWER
P-89-130 0.75" 3 #10 XHHW-2 1 #10 XHHW-2 FR: DISCONNECT P-89-131 TO: PB-8901
3 #10 >> EDR-99101 & EDR-99102 POWER
P-89-131 2" 11 #10 XHHW-2 1 #10 XHHW-2 FR: PB-8901 P-89-132 TO: HH-10
3 #10 >> FV-60100 POWER P-60-120
3 #10 >> FV-60102 POWER P-60-120
3 #10 >> EDR-99101 & EDR-99102 POWER P-89-130
2 #10 >> FIT-99105 POWER L-89-120
P-89-132 2" 11 #10 XHHW-2 1 #10 XHHW-2 FR: HH-10 P-89-133 TO: MH-12
3 #10 >> FV-60100 POWER P-89-131
3 #10 >> FV-60102 POWER P-89-131
3 #10 >> EDR-99101 & EDR-99102 POWER P-89-131
2 #10 >> FIT-99105 POWER P-89-131
July 12, 2023 - CONFORMED 16990-5 8660F10
CONDUIT SCHEDULE AREA ENGINEER HR
Ukiah Recycle Water Project REVISION
Waste Water Treatment Plant DATE 4/4/23
CONDUIT CONDUCTORS GROUND
NUMBER DWG SIZE # SIZE TYPE # SIZE TYPE DESCRIPTION CONNECTING
SEGMENTS
P-89-133 2" 11 #10 XHHW-2 1 #10 XHHW-2 FR: MH-12 P-89-134 TO: PB-7001
3 #10 >> FV-60100 POWER P-89-132
3 #10 >> FV-60102 POWER P-89-132
3 #10 >> EDR-99101 & EDR-99102 POWER P-89-132
2 #10 >> FIT-99105 POWER P-89-132
P-89-134 1.5" 11 #10 XHHW-2 1 #10 XHHW-2 FR: PB-7001 P-89-135 TO: CONDUIT TEE
3 #10 >> FV-60100 POWER P-89-133
3 #10 >> FV-60102 POWER P-89-133
3 #10 >> EDR-99101 & EDR-99102 POWER P-89-133
2 #10 >> FIT-99105 POWER P-89-133
P-89-135 0.75" 3 #10 XHHW-2 1 #10 XHHW-2 FR: CONDUIT TEE TO: MCC70293
3 #10 >> EDR-99101 & EDR-99102 POWER P-89-134
P-89-136 1" 8 #10 XHHW-2 1 #10 XHHW-2 FR: CONDUIT TEE
TO: MCC70291
3 #10 >> FV-60100 POWER P-89-134
3 #10 >> FV-60102 POWER P-89-134
2 #10 >> FIT-99105 POWER P-89-134
S-89-100 0.75" 1 2/CS-#16 1 #14 XHHW-2 FR: LIT-89103 S-89-101 TO: PB-8901
1 2/CS-#16 >> LIT-89103 SIGNAL
S-89-101 2" 1 2/CS-#16 1 #14 XHHW-2 FR: PB-8901 S-89-102 TO: HH-11
1 2/CS-#16 >> LIT-89103 SIGNAL S-89-100
S-89-102 2" 1 2/CS-#16 1 #14 XHHW-2 FR: HH-11 S-89-103
TO: PB-7002 (VIA PB-HH-13)
1 2/CS-#16 >> LIT-89103 SIGNAL S-89-101
S-89-103 0.75" 1 2/CS-#16 1 #14 XHHW-2 FR: PB-7002 (VIA PB-HH-13) TO: PLC70299
1 2/CS-#16 >> LIT-89103 SIGNAL S-89-102
X-89-100 2" 1 PULL ROPE FR: PB-8901
TO: HH-10
1 PULL >> SPARE
X-89-101 2" 1 PULL ROPE FR: PB-8901
TO: HH-11
1 PULL >> SPARE
X-89-110 2" 1 PULL ROPE FR: HH-10
TO: MH-12
1 PULL >> SPARE
X-89-111 2" 1 PULL ROPE FR: MH-12
TO: PB-7001
1 PULL >> SPARE
X-89-112 2" 1 PULL ROPE FR: HH-10
TO: MH-12
1 PULL >> SPARE
X-89-113 2" 1 PULL ROPE FR: MH-12
TO: PB-7001
1 PULL >> SPARE
X-89-120 2" 1 PULL ROPE FR: PB-8901
TO: HH-10
1 PULL >> SPARE
X-89-125 2" 1 PULL ROPE FR: PB-8901
TO: HH-11
1 PULL >> SPARE
C-91-100 1" 5 #14 XHHW-2 1 #14 XHHW-2 FR: LCP-91100 C-91-110 1 3/CS-#16 TO: PB-9101
5 #14 >> LCP-91100 CONTROL
1 3/CS-#16 >> LCP-91100 SPEED CONTROL
C-91-104 0.75" 1 MFR CABLE 1 #14 XHHW-2 FR: LSHH/LSL-91101 TO: JUNCTION BOX
1 MFR >> LSHH/LSL-91101 CONTROL
July 12, 2023 - CONFORMED 16990-6 8660F10
CONDUIT SCHEDULE AREA ENGINEER HR
Ukiah Recycle Water Project REVISION
Waste Water Treatment Plant DATE 4/4/23
CONDUIT CONDUCTORS GROUND
NUMBER DWG SIZE # SIZE TYPE # SIZE TYPE DESCRIPTION CONNECTING
SEGMENTS
C-91-105 1" 4 #14 XHHW-2 1 #14 XHHW-2 FR: JUNCTION BOX C-91-110 TO: PB-9101
4 #14 >> LSHH/LSL-91101 CONTROL
C-91-106 1" 3 #12 XHHW-2 1 #12 XHHW-2 FR: FSL-91100 C-91-110 TO: PB-9101
3 #12 >> FSL-91100 POWER/CONTROL
C-91-110 2" 5 #12 XHHW-2 1 #12 XHHW-2 FR: PB-9101 C-91-111 11 #14 XHHW-2 TO: HH-10
1 3/CS-#16 3 #12 >> FSL-91100 POWER/CONTROL C-91-106
4 #14 >> LSHH/LSL-91101 CONTROL C-91-105
5 #14 >> LCP-91100 CONTROL C-91-100
1 3/CS-#16 >> LCP-91100 SPEED CONTROL C-91-100
2 #14 >> PMP-91100 TSH P-91-100
2 #12 >> PMP-91100 MWH P-91-100
C-91-111 2" 5 #12 XHHW-2 1 #12 XHHW-2 FR: HH-10 C-91-112 11 #14 XHHW-2 TO: PB-7001
1 3/CS-#16 3 #12 >> FSL-91100 POWER/CONTROL C-91-110
4 #14 >> LSHH/LSL-91101 CONTROL C-91-110
5 #14 >> LCP-91100 CONTROL C-91-110
1 3/CS-#16 >> LCP-91100 SPEED CONTROL C-91-110
2 #14 >> PMP-91100 TSH C-91-110
2 #12 >> PMP-91100 MWH C-91-110
C-91-112 1.5" 5 #12 XHHW-2 1 #12 XHHW-2 FR: PB-7001
11 #14 XHHW-2 TO: VFD-91100
1 3/CS-#16 3 #12 >> FSL-91100 POWER/CONTROL C-91-111
4 #14 >> LSHH/LSL-91101 CONTROL C-91-111
5 #14 >> LCP-91100 CONTROL C-91-111
1 3/CS-#16 >> LCP-91100 SPEED CONTROL C-91-111
2 #14 >> PMP-91100 TSH C-91-111
2 #12 >> PMP-91100 MWH C-91-111
L-91-100 2" 4 #8 XHHW-2 1 #10 XHHW-2 FR: PAU PS LIGHTING AND RECEPTACLE TO: HH-10
4 #8 >> PAU PS LIGHTING AND RECEPTACLE
P-91-100 2" 1 3/C-#8:VFD VFD INTEGRAL FR: PMP-91100 C-91-110 2 #12 XHHW-2 TO: PB-9101
2 #14 XHHW-2 1 3/C-#8:VFD >> PMP-91100 POWER
2 #14 >> PMP-91100 TSH
2 #12 >> PMP-91100 MWH
P-91-101 2" 1 3/C-#8:VFD VFD INTEGRAL FR: PB-9101
TO: PB-7001
1 3/C-#8:VFD >> PMP-91100 POWER P-91-100
P-91-102 1.5" 1 3/C-#8:VFD VFD INTEGRAL FR: PB-7001
TO: VFD-91100
1 3/C-#8:VFD >> PMP-91100 POWER
P-91-105 0.75" 3 #10 XHHW-2 1 #10 XHHW-2 FR: VFD-91100
TO: MCC70293
3 #10 >> VFD-91100 POWER
X-91-100 2" 1 PULL ROPE FR: PB-9101
TO: HH-10
1 PULL >>
X-91-102 2" 1 PULL ROPE FR: STUB UP
TO: HH-11
1 PULL >>
END OF CONDUIT SCHEDULE
END OF SECTION
July 12, 2023 - CONFORMED 16990-7 8660F10
Common Work Results for Process Control and Instrumentation Systems 17050-1 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17050 (CONFORMED) SECTION 17050
COMMON WORK RESULTS FOR PROCESS CONTROL AND
INSTRUMENTATION SYSTEMS
PART 1 GENERAL
1.01 SUMMARY
A. Section includes:
1. Process control and instrumentation systems requirements for common components including installation.
2. Loop drawings:
a. Provide complete loop drawings for all systems, including packaged equipment furnished as part of a vendor furnished package, and pre-purchased equipment.
b. The form, minimum level of detail, and format for the loop drawings must match that of the sample loop drawings included in the Contract Documents.
c. The Owner and Engineer are not responsible for providing detailed loop diagrams for Contractor furnished equipment.
3. The requirements of the Instrumentation and Control Specifications apply to all Instrumentation and Control Work specified in Technical Sections, including packaged mechanical systems, LCPs, VCPs, etc.
B. Contract Documents:
1. Contract drawings:
a. Schematic diagrams:
1) Use schematic diagrams in conjunction with the descriptive operating sequence in the Technical Sections to furnish a coordinated and fully functional control system.
2) Schematic diagrams show control function only.
a) Incorporate other necessary functions for proper operation and protection of the system.
3) Controls are indicated on the Drawings as de-energized. 4) Mount devices shown on motor controller schematic diagrams in the controller compartment enclosure, unless otherwise noted or indicated on the Drawings.
1.02 REFERENCES
A. Code compliance:
1. As specified in Section 01410 - Regulatory Requirements:
2. The publications are referenced in this Section by basic designation only without a specified publish date.
Common Work Results for Process Control and Instrumentation Systems 17050-2 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17050 (CONFORMED) B. American Petroleum Institute (API):
1. RP 550 - Manual on Installation of Refinery Instruments and Control Systems; Part II-Process Stream Analyzers; Section 5-Oxygen Analyzers.
2. RP 551 - Process Measurement Instrumentation.
C. International Organization for Standardization (ISO):
1. 9001 - Quality Management Systems - Requirements.
D. International Society of Automation (ISA):
1. 5.1 - Instrumentation Symbols and Identification.
2. 5.4 - Instrument Loop Diagrams.
E. National Electrical Code (NEC).
F. National Electrical Manufacturers Association (NEMA).
G. Underwriters Laboratories, Inc. (UL):
1. 508 - Standard of Safety for Industrial Control Equipment.
2. 508A - Standard of Safety for Industrial Control Panels.
1.03 DEFINITIONS
A. Control circuit: Any circuit operating at 120 volts alternating current (VAC) or direct current (VDC) or less, whose principal purpose is the conveyance of information (including performing logic) and not the conveyance of energy for the operation of an electrically powered device.
B. Digital bus: A communication network, such as PROFIBUS, Foundation Fieldbus, or DeviceNet, allowing instruments and devices to transmit data, control functions, and diagnostic information.
C. Modifications: Changing, extending, interfacing to, removing, or altering an existing circuit.
D. Panel: An instrument support system that may be a flat surface, a partial enclosure, or a complete enclosure for instruments and other devices used in process control systems.
E. Power circuit: Any circuit operating at 90 volts (AC or DC) or more, whose principal purpose is the conveyance of energy for the operation of an electrically powered device.
F. Powered transmitters: A transmitter that requires a separate power source (120 VAC, 240 VAC, etc.) in order for the transmitter to develop its signal. As used in this Section, the produced signal may be a 4 to 20 mA 24 VDC signal, a digital bus communications signal, or both.
G. RS-232: RS-232 is also known as TIA-232 or EIA-232, is a standard for serial communication transmission of data. When compared to RS-485 it has lower transmission speed, short maximum cable length, large voltage swing, large
Common Work Results for Process Control and Instrumentation Systems 17050-3 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17050 (CONFORMED) standard connectors and no multipoint capability. USB has displaced RS-232 from most of its peripheral interface roles.
H. RS-485: RS-485 is also known as TIA-485 or EIA-485, is a standard defining the electrical characteristics of drivers and receivers for use in serial communications system. Electrical signaling is balanced, and multipoint systems are supported, can be used with data rates up to 10 Mbit/s or at lower speeds distances up to 1,000 meters (4,000 feet).
I. Signal circuit: Any circuit operating at less than 50 VAC or VDC, which conveys analog information or digital communications information.
J. 2-Wire transmitter (loop powered): A transmitter that derives its operating power supply from the signal transmission circuit and requires no separate power supply connections. As used in this Section, 2-wire transmitter refers to a transmitter that provides a signal such as 4 to 20 mA 24 VDC regulation of a signal in a series circuit with an external 24 VDC driving potential:
1. Fieldbus communications signal or both.
K. USB: Universal Serial Bus is an industry standard that establishes specifications for cables, connectors, and protocols for connection, communication, and power supply interfacing between computer, peripherals, and other computers, it has largely replaced interfaces such as serial and parallel ports.
L. Acronym definitions:
1. ACB: Automatic current balance.
2. ATS: Automatic Transfer Switch.
3. CCS: The PCS central computer system (CCS) consisting of computers and software. The personal computer-based hardware and software system that includes the operator interface, data storage, data retrieval, archiving, alarming, historian, reports, trending, and other higher level control system software and functions.
4. DPDT: Double-pole, double-throw.
5. ECP: Electronic circuit protector.
6. ES: Ethernet Switch.
7. FAT: Factory acceptance test also known as Source Test.
8. HART: Highway addressable remote transducer.
9. HOA: Hand-Off-Auto control function that is totally PLC based. In the Hand mode, equipment is started or stopped, valves are opened or closed through operator direction under the control of the PLC software. In the Auto mode, equipment is started or stopped and valves are opened or closed through a control algorithm within the PLC software. In the Off mode, the equipment is prohibited from responding from the PLC control.
10. HMI: Human machine interface is a software application that presents information to an operator or user about the state of a process, and to accept and implement the operators control instructions. Typically information is displayed in a graphical format.
11. ICSC: Instrumentation and control system contractor: Subcontractor who specializes in the design, construction, fabrication, software development, installation, testing, and commissioning of industrial instrumentation and control systems.
Common Work Results for Process Control and Instrumentation Systems 17050-4 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17050 (CONFORMED)
12. IJB: Instrument junction boxes: A panel designed with cord sets to easily remove, replace, or relocate instrument signals.
13. I/O: Input/Output.
14. IP: Internet protocol or ingress protection.
15. LCP: Local control panel: Operator interface panel that may contain an HMI, pilot type control devices, operator interface devices, control relays, etc. and does not contain a PLC or RIO.
16. LAN: Local area network: A control or communications network that is limited to the physical boundaries of the facility.
17. LOI: Local Operator Interface is an operator interface device consisting of an alphanumeric or graphic display with operator input functionality. The LOI is typically a flat panel type of display mounted on the front of an enclosure with either a touch screen or tactile button interface.
18. LOR: Local-Off-Remote control function. In the Remote mode, equipment is started or stopped, and valves are opened or closed through the PLC based upon the selection of the HOA. In the Local mode, equipment is started or stopped, valves are opened or closed based upon hardwired control circuits completely independent of the PLC with minimum interlocks and permissive conditions. In the Off mode, the equipment is prohibited from responding to any control commands.
19. NJB: Network junction box. An enclosure that contains multiple access points to various networks within the facility. Networks could be Ethernet, Ethernet/IP, Fieldbus, RIO, etc.
20. P&ID: Process and instrumentation diagram.
21. PC: Personal computer.
22. PCIS: Process control and instrumentation system: Includes the entire instrumentation system, the entire control system, and all of the Work specified in the Instrumentation and Control Specifications and depicted on the Instrumentation Drawings. This includes all the PCS and instruments and networking components as well as the various servers, workstations, thin clients, etc.
23. PCM: Process control module: An enclosure containing any of the following devices: PLC, RTU, or RIO.
24. PCS: Process Control System: A general name for the computerized system that gathers and processes data from equipment and sensors and applies operational controls to the process equipment. It includes the PLCs and/or RIOs, LOIs, HMIs, both LCPs, VCPs and all data management systems accessible to staff.
25. PJB: Power junction box: An enclosure with terminal blocks that distribute power to multiple instruments.
26. PLC: Programmable logic controller.
27. PS: Power supply.
28. RIO: Remote I/O device for the PLC consisting of remote I/O racks, or remote I/O blocks.
29. RTU: Remote telemetry unit: A controller typically consisting of a PLC, and a means for remote communications. The remote communications devices typically are radios, modems, etc.
30. SCADA: Supervisory control and data acquisition system: A general name for the computerized system that gathers and processes data from sensors and equipment located outside of the facility, such as wells, lift stations, metering stations, etc.
Common Work Results for Process Control and Instrumentation Systems 17050-5 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17050 (CONFORMED)
31. SELV: Safety extra-low voltage.
32. SFP: Small form-factor pluggable.
33. SPDT: Single-pole, double-throw.
34. SPST: Single-pole, single-throw.
35. UPS: Uninterruptible power supply.
36. VCP: Vendor control panel: Control panels that are furnished with particular equipment by a vendor other than the ICSC. These panels may contain PLCs, RIO, LOI, HMI, etc.
37. WAN: Wide area network: A control or communications network that extends beyond the physical boundaries of the facility.
1.04 SUBMITTALS
A. General:
1. Adhere to the wiring numbering scheme specified in Section 16075 - Identification for Electrical Systems throughout the Project:
a. Uniquely number each wire.
b. Wire numbers must appear on Equipment Drawings.
2. Some items of Work are represented schematically, and are designated for the most part by numbers, as derived from criteria in ISA-5.1:
a. Employ the nomenclature and numbers designated in this Section and indicated on the Drawings exclusively throughout shop drawings, data sheets, and similar submittals.
b. Replace any other symbols, designations, and nomenclature unique to a manufacturer’s, suppliers, or subcontractor’s standard methods with those identified in this Section and indicated on the Drawings.
B. Specific submittal requirements:
1. Control Panel Drawings:
a. General Requirements:
1) Submit panel, enclosure, console, furniture, and cabinet layout drawings for all items provided.
2) Use equipment and instrument tags as depicted on the P&IDs for all submittals.
3) Nameplates and Wire Labeling:
a) Nameplate legend including text, letter size, materials, and colors.
b) As specified in Section 16075 - Identification for Electrical Systems or as indicated on the Drawings.
4) Structural Requirements:
a) Anchoring method and leveling criteria, including manufacturer’s recommendations for the Project site seismic criteria.
b) Weight.
5) Clearly show all modifications to existing circuits:
a) Show all existing unmodified wiring to clearly depict the functionality and electrical characteristics of the complete modified circuits.
b. Required for materials and equipment listed in this and other Technical Sections.
Common Work Results for Process Control and Instrumentation Systems 17050-6 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17050 (CONFORMED) c. Front, side, rear, internal, external elevations and top and bottom views, showing all dimensions and all to scale.
1) Locations of conduit entrances and access plates.
2) Component layout and identification.
3) Complete and detailed bills of materials:
a) Including quantity, description, manufacturer, and part number for each assembly or component for each control panel.
b) Include all items within an enclosure.
4) Requirements for physical separation between control system components and 120 VAC, 480 VAC, and medium-voltage power cables.
5) Complete grounding requirements for each system component including any requirements for PLCs, process LANs, and Control System equipment.
6) PLC rack and card layout:
a) Provide a count of current I/O allocation.
b) Future I/O allocation.
c) Quantity of spares provided.
7) NEMA rating.
8) Material and finish.
2. Schematics and Wiring Diagrams:
a. General Requirements:
1) Submit panel wiring diagrams for every panel that contains wiring. 2) Use equipment and instrument tags as depicted on the P&IDs for all submittals.
3) Nameplates and Wire Labeling:
a) As specified in Section 16075 - Identification for Electrical Systems or as indicated on the Drawings.
4) Clearly show all modifications to existing circuits:
a) Show all existing unmodified wiring to clearly depict the functionality and electrical characteristics of the complete modified circuits.
b. Include the following information:
1) Name of panel.
2) Wiring sizes and types.
3) Terminal strip numbers.
4) Terminal identification for device and field connections. 5) Wire tags and labels.
6) Functional name and manufacturer's designation for items to which wiring are connected.
7) Set points for relays and control or alarm contact settings. c. Incorporate equipment manufacturer’s shop drawing information into the schematic diagrams in order to document the entire control system.
3. Loop Drawings:
a. General Requirements:
1) Submit loop drawings for every analog, discrete, fieldbus signal, vendor supplied equipment packages, and control panels:
a) Includes all monitoring, alarming, interlocks, and control devices. 2) Use equipment and instrument tags as depicted on the P&IDs for all submittals.
Common Work Results for Process Control and Instrumentation Systems 17050-7 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17050 (CONFORMED) 3) Show and identify each component of each loop or system using requirements and symbols from ISA-5.4.
4) Provide drawings for every instrumentation loop system:
a) Furnish a separate drawing sheet for each system or loop diagram.
5) Nameplates and Wire Labeling:
a) As specified in Section 16075 - Identification for Electrical Systems or as indicated on the Drawings.
6) Clearly show all modifications to existing circuits:
a) Show all existing unmodified wiring to clearly depict the functionality and electrical characteristics of the complete modified circuits.
7) Provide loop drawings in the format indicated in the contract drawings.
b. Provide a complete index in the front of each bound volume:
1) Index the loop drawings by systems or process areas. c. In addition to the ISA-5.4 requirements, show the following details:
1) Functional name of each loop.
2) Reference name, drawing, and loop diagram numbers for any signal continuing off the loop diagram sheet.
3) Show all terminal numbers, regardless of the entity providing the equipment.
4) MCC panel, circuit, and breaker numbers for all power feeds to the loops and instrumentation.
5) Terminal assignments associated with every manhole, pull-box, junction box, conduit, and panel through which the loop circuits pass. 6) Show vendor control panel, instrument panel, conduit, junction box, equipment and PCS terminations, termination identification, wire numbers and colors, power circuits, and ground identifications. 7) Cables required for communication requirements.
4. PLC I/O List:
a. A complete listing of the PCS system point I/O database:
1) Include for each data point relevant parameters such as range, contact orientation, limits, incremental limits, I/O hardware address, and PLC assignment.
2) Organize on a site-by-site basis and separate by point type. 3) In addition to the active l/O points, list the implemented spare l/O points and the available l/O points remaining on each card, as well as other defined future points specified or shown.
4) Upon completion of the Work, update all I/O lists to indicate the final as-built configuration of the systems:
a) Organize as-built I/O list on a site-by-site basis, separated by equipment and point type.
5. Control Descriptions:
a. For each control loop, provide programming logic in the form of a written functional description of the operation of the equipment, signals, and controls based on the requirements specified in Section 17100 - Control Strategies, and Section 17101 - Specific Control Strategies, and as shown on the P&IDs:
1) Functional descriptions shall be modified to reflect the actual programming to be implemented in the PLCs.
Common Work Results for Process Control and Instrumentation Systems 17050-8 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17050 (CONFORMED) 2) Include each function depicted or described in the Contract Documents.
3) Include within the Control Description content:
a) Specific requirements.
b) Common requirements that pertain in general to all loops. c) Listing ranges, setpoints, timers, values, counter values, etc. d) Manual keyboard entries.
e) Entry codes.
f) System responses.
g) Modes:
(1) Startup.
(2) Routine and normal operation.
(3) Regulation and control.
(4) Shutdown under specified modes of operation.
(5) Emergency operating shutdown.
6. Instrument Data Sheets:
a. The data sheets provided with the instrument specifications are preliminary and are not complete but are provided to assist with the completion of final instrument data sheets. Additional data sheets may be required.
b. Furnish fully completed data sheets for each instrument and component according to ISA-20 Specification Forms for Process Measurement and Control Instruments, Primary Elements and Control Valves. c. Format: Provide data sheets in Microsoft Word or Microsoft Excel. 1) Features and options that are furnished.
d. Provide completed data sheet as specified in the Technical Sections and for each control system component.
7. Instrument Installation Drawings:
a. Provide instrument installation, mounting, and anchoring details for all components and assemblies, including access requirements and conduit connection or entry details.
b. Each installation shall be identified by the equipment or instrument by tag number.
c. Provide certification by the instrument manufacturer that the proposed installation is in accordance with the instrument manufacturer's recommendations and is fully warrantable.
d. Provide, at a minimum, the following contents for each detail:
1) Necessary sections and elevation views required to define instrument location by referencing tank, building, or equipment names and numbers, and geographical qualities such as north, south, east, west, basement, first floor, etc.
2) Ambient temperature and humidity where the instrument is to be installed.
3) Corrosive qualities of the environment where the instrument is to be installed.
4) Hazardous rating of the environment where the instrument is to be installed.
5) Process line pipe or tank size, service, and material. 6) Process tap elevation and location.
7) Upstream and downstream straight pipe lengths between instrument installation and pipe fittings and valves.
Common Work Results for Process Control and Instrumentation Systems 17050-9 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17050 (CONFORMED) 8) Routing of tubing and identification of supports.
9) Mounting brackets, stands, anchoring devices, and sunshades. 10) Conduit entry size, number, location, and delineation between power and signal.
11) NEMA ratings of enclosures and all components.
12) Clearances required for instrument servicing.
13) List itemizing all manufacturer makes, model numbers, quantities, lengths required, and materials of each item required to support the implementation of the detail.
8. Product data:
a. Provide a technical brochure or bulletin (“cutsheet”) for each instrument or equipment on the project labeled with equipment and instrument tags as depicted on the P&IDs.
1) Submit with the corresponding data sheets:
2) Organization: Index product data in the submittal by systems or loops.
b. Engineering data:
1) Test data and performance curves, when applicable.
c. Manufacturer's technical reference manuals.
9. Commissioning Submittals:
a. As specified in Section 01756 - Commissioning.
b. Manufacturer representative qualifications.
c. Manufacturer certificates.
d. Test plans.
e. Test reports.
f. Owner training submittals.
g. Operation and maintenance manuals.
1) Organize the operation and maintenance manuals for each process in the following manner:
a) Section A - Process and Instrumentation Diagrams.
b) Section B - Control Panel Drawings.
c) Section D - Schematics and Wiring Diagrams.
d) Section E - Loop Drawings.
e) Section F - Network Diagrams.
f) Section G - PLC I/O List.
g) Section H - Control Descriptions.
h) Section I - Instrument Data Sheets.
i) Section J - Instrument Installation Drawings.
j) Section K - Product Data.
k) Section L - Sizing Calculations.
l) Section M - Test Results.
m) Section N - Operational Manual.
n) Section O - Spare Parts List.
o) Section P - PLC Programs.
10. Meetings:
a. As specified in Section 01312 - Project Meetings and in this Section.
Common Work Results for Process Control and Instrumentation Systems 17050-10 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17050 (CONFORMED)
1.05 QUALITY ASSURANCE
A. Manufacture instruments at facilities certified to the quality standards of ISO 9001.
B. Provide equipment listed by and bearing the label of UL or of an independent testing laboratory acceptable to the Engineer and the Authority Having Jurisdiction.
C. The ICSC must have their own operating UL listed panel fabrication facility.
1. Panels must be fabricated at this facility and meet UL 508/508A requirements.
1.06 DELEGATED DESIGN (NOT USED)
1.07 DELIVERY, STORAGE, AND HANDLING
A. Upon receipt of instruments in the field:
1. Outside of the package: Prominently display tag number identification.
2. On each instrument: Provide a nameplate as specified in this Section.
1.08 PROJECT OR SITE CONDITIONS
A. Project conditions:
1. Area classifications:
a. Furnish enclosures that match the area classifications as specified in Section 16050 - Common Work Results for Electrical.
B. Non-conditioned spaces:
1. Provide additional temperature conditioning equipment to maintain all equipment in non-conditioned spaces subject to these ambient temperatures, with a band of 10 degrees Fahrenheit above the minimum operating temperature and 10 degrees Fahrenheit below maximum operating temperature, as determined by the equipment manufacturer’s guidelines.
C. Outdoor installations:
1. Provide electrical, instrumentation and control equipment suitable for operation in the ambient conditions where the equipment is located.
2. Provide heating, cooling, and dehumidifying devices incorporated into and included with electrical equipment, instrumentation and control panels to maintain the enclosures within the rated environmental operating ranges as specified in the Sections for the equipment.
1.09 SEQUENCING
A. As specified in Section 01312 - Project Meetings.
B. Project PCIS overview conference:
1. Contractor leads the meeting.
2. Timing:
a. Prior to start of ICSC and Programmer Work.
3. Attendees:
a. Engineer, Owner, ICSC, and Programmer.
b. Contractor.
Common Work Results for Process Control and Instrumentation Systems 17050-11 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17050 (CONFORMED) c. Electrical subcontractor.
d. Manufacturers furnishing major pieces of equipment must attend, including but not limited to:
1) Vendor control panels.
2) Chemical feed systems.
3) Motor control centers.
4) Switchgear.
5) Variable frequency drives.
6) Lighting.
7) Engine generators.
4. Agenda:
a. Meeting purpose:
1) Review the entire project, equipment, control philosophy, schedules, and submittal requirements.
b. Review entire project.
c. Review equipment lists.
d. Review control philosophy.
e. Review schedules.
f. Review submittal requirements.
g. Safety and security.
h. Action items.
i. Next meeting.
C. System configuration meetings: Meet on at least the following occasions:
1. Preliminary meeting:
a. Contractor leads the meeting.
b. Timing:
1) Before configuration work is begun.
c. Attendees:
1) Engineer, Owner, ICSC, and Programmer.
d. Agenda:
1) Meeting purpose:
a) Review the system configuration, the HMI system database, control schemes, displays, report formats, etc.
2) Review the ICSC provided examples of displays, display symbols, reports, etc. to show the capabilities of the system software. 3) Safety and security.
4) Action items.
5) Next meeting.
2. Development review meeting:
a. Contractor leads the meeting.
b. Timing:
1) After the initial database is entered and typical screens and reports have been entered.
c. Attendees:
1) Engineer, Owner, ICSC, and Programmer.
d. Agenda:
1) Meeting purpose:
a) Review the system configuration, the HMI system database, control schemes, displays, report formats, etc.
2) Review the system configuration.
Common Work Results for Process Control and Instrumentation Systems 17050-12 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17050 (CONFORMED) 3) Review the HMI system database.
4) Review the control schemes.
5) Review the displays.
6) Review the report formats.
7) Safety and security.
8) Action items.
9) Next meeting.
3. Pre-submittal review meeting:
a. Contractor leads the meeting.
b. Timing:
1) Before producing any submittals.
c. Attendees:
1) Engineer, Owner, ICSC, and Programmer.
d. Agenda:
1) Meeting purpose:
a) Review the system configuration, the HMI system database, control schemes, displays, report formats, etc.
b) Review an informal hardcopy of developed HMI screens for review by the Engineer.
2) Review the system configuration.
3) Review the HMI system database.
4) Review the control schemes.
5) Review the displays.
6) Review the report formats.
7) Review an informal hardcopy of developed HMI screens. 8) Review the submittal schedule.
9) Safety and security.
10) Action items.
11) Next meeting.
4. Final review meeting:
a. Contractor leads the meeting.
b. Timing:
1) After initial completion of configuration work.
2) Prior to the Source Test.
c. Attendees:
1) Engineer, Owner, ICSC, and Programmer.
d. Agenda:
1) Meeting Purpose:
a) Review the system configuration, the HMI system database, control schemes, displays, report formats, etc.
2) Review the system configuration.
3) Review the HMI system database.
4) Review the control schemes.
5) Review the displays.
6) Review the report formats.
7) Safety and security.
8) Action items.
9) Next meeting.
e. Make final format revisions after this review.
Common Work Results for Process Control and Instrumentation Systems 17050-13 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17050 (CONFORMED)
5. Additional requirements as specified in the following:
a. Section 17100 - Control Strategies.
b. Section 17101 - Specific Control Strategies.
c. Section 17720 - Control Systems: Programmable Logic Controllers.
D. Control logic meetings: Meet on at least the following occasions:
1. Preliminary meeting:
a. Contractor leads the meeting.
b. Timing:
1) Before configuration work is begun on any PLCs programmed by the Contractor (including those provided through subcontractors and suppliers).
c. Attendees:
1) Owner, Engineer, ICSC, and Programmer.
2) Individuals responsible for programming PLCs and other programmable devices supplied by Contractor may attend by telephone conference call.
d. Agenda:
1) Meeting purpose:
a) Discuss overall control logic.
2) Review list of each PLC and other programmable devices that will interface to the rest of the control system, including make, model, and a description of the interface.
3) Review contact information for each individual responsible for programming each said PLC and other programmable device. 4) Review schedule of submittals that will contain HMI/LOI interface information.
5) Safety and security.
6) Action items.
7) Next meeting.
2. Development review meeting:
a. Contractor leads the meeting.
b. Timing:
1) After approximately one-half of the HMI/LOI interface submittals have been submitted.
c. Attendees:
1) Owner, Engineer, ICSC, and Programmer.
2) Individuals responsible for programming PLCs and other programmable devices supplied by Contractor may attend by telephone conference call.
d. Agenda:
1) Meeting purpose:
a) Discuss progress on control logic.
2) Discuss HMI/LOI interface submittals to date.
3) Discuss HMI/LOI interface future submittals and their requirements. 4) Discuss half of the screens "drafted" but not submitted. 5) Review list of each PLC and other programmable devices that will interface to the rest of the control system, including make, model, and a description of the interface.
6) Review contact information for each individual responsible for programming each said PLC and other programmable device.
Common Work Results for Process Control and Instrumentation Systems 17050-14 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17050 (CONFORMED) 7) Review schedule of submittals that will contain HMI/LOI interface information.
8) Safety and security.
9) Action items.
a) Document Vendor Control Panel programming requirements. 10) Next meeting.
3. Pre-submittal review meeting:
a. Contractor leads the meeting.
b. Timing:
1) Before producing any submittals.
c. Attendees:
1) Engineer, Owner, ICSC, and Programmer.
d. Agenda:
1) Meeting purpose:
a) Coordinate submittals.
2) Review the system configuration, the HMI system database, control schemes, displays, report formats, etc.
3) Review an informal hardcopy of developed HMI screens for review by the Engineer to determine that requirements are being sufficiently met.
4) Review the submittal schedule.
5) Safety and security.
6) Action items.
7) Next meeting.
4. Vendor control panel programming meetings:
a. Contractor leads the meeting.
b. Timing:
1) Prior to start of vendor control panel programming Work. c. Attendees:
1) Owner, Engineer, ICSC, and Programmer.
2) Individuals responsible for programming PLCs and other programmable devices supplied by Contractor may attend by telephone conference call.
3) Each equipment supplier who is providing equipment with a PLC and/or LOI.
d. Agenda:
1) Meeting purpose:
a) Coordinate control logic requirements for specific equipment. 2) Review minimum Vendor Control Panel programming requirements:
a) PLC to PLC global data mapping.
b) PLCs to HMI tags mapping.
c) Communication methods.
3) Review advanced Vendor Control Panel programming requirements, as applicable:
a) Tag naming conventions.
b) LOI screen colors and navigation.
c) Interlock and permissive definitions.
d) Alarms: Clearing, formats, colors, and status.
e) Standard code blocks for common control functionality. 4) Safety and security.
Common Work Results for Process Control and Instrumentation Systems 17050-15 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17050 (CONFORMED) 5) Action items.
6) Next meeting.
5. Final review meeting:
a. Contractor leads the meeting.
b. Timing:
1) After all HMI/LOI interface submittals have been submitted. c. Attendees:
1) Owner, Engineer, and Programmer.
2) Individuals responsible for programming PLCs and other programmable devices supplied by Contractor may attend by telephone conference call.
d. Agenda:
1) Meeting purpose:
a) Discuss HMI/LOI interface submittals and requirements. 2) Review minimum programming requirements:
a) PLC to PLC global data mapping.
b) PLCs to HMI tags mapping.
c) Communication methods.
3) Review advanced requirements, as applicable:
a) Tag naming conventions.
b) LOI screen colors and navigation.
c) Interlock and permissive definitions.
d) Alarms: Clearing, formats, colors, and status.
e) Standard code blocks for common control functionality. 4) Safety and security.
5) Action items.
6) Next meeting.
6. Additional requirements as specified in the following:
a. Section 17100 - Control Strategies.
b. Section 17101 - Specific Control Strategies.
c. Section 17720 - Control Systems: Programmable Logic Controllers.
1.10 SCHEDULING (NOT USED)
1.11 WARRANTY (NOT USED)
1.12 SYSTEM PROCESS START-UP (NOT USED)
1.13 OWNER'S INSTRUCTIONS (NOT USED)
1.14 MAINTENANCE (NOT USED)
PART 2 PRODUCTS
2.01 MANUFACTURERS (NOT USED)
2.02 DESIGN AND PERFORMANCE REQUIREMENTS (NOT USED)
Common Work Results for Process Control and Instrumentation Systems 17050-16 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17050 (CONFORMED)
2.03 SYSTEM DESCRIPTION (NOT USED)
2.04 EXISTING PRODUCTS (NOT USED)
2.05 MATERIALS (NOT USED)
2.06 MANUFACTURED UNITS (NOT USED)
2.07 EQUIPMENT (NOT USED)
2.08 COMPONENTS
A. Furnish meters, instruments, and other components that are the most recent field proven models marketed by their manufacturers at the time of submittal of the shop drawings unless otherwise specified to match existing equipment.
B. Unless otherwise specified, furnish individual instruments that have a minimum accuracy of within 0.5 percent of full scale and a minimum repeatability of within
0.25 percent of full scale.
C. Signal transmission:
1. Analog signals:
a. Furnish analog measurements and control signals that vary in direct linear proportion to the measured variable, unless otherwise indicated. b. Furnish electrical analog signals outside control panels that are 4-to-20 milliamperes 24 VDC, except as indicated.
c. Electrically or optically isolate all analog signals from other signals. d. Furnish regulated analog signals that are not affected by changes in supply voltage or load resistance within the unit’s rating. e. Maintain the total 4-to-20 milliamperes loop impedance to 10 percent below the published value at the loop operating voltage. f. Where necessary, reduce loop impedance by providing current-to-current (I/I) isolation amplifiers for signal re-transmission.
2. Discrete input signals:
a. As indicated in the controller hardware specification.
3. Discrete output signals:
a. Dry contacts or TRIAC outputs (with express written approval by the Engineer) as needed to coordinate with the field device. b. Provide external terminal block mounted fuse with blown fuse indication for all discrete outputs.
c. Provide interposing relays for all discrete outputs for voltage and/or current compatibilities.
d. Provide interposing relays as required for functionality of the control circuit.
4. Signal performance and design criteria:
a. Stability:
1) After controls have taken corrective action, oscillation of the final control element shall not exceed 2 cycles per minute or a magnitude of motion of 0.5 percent of full travel.
Common Work Results for Process Control and Instrumentation Systems 17050-17 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17050 (CONFORMED) b. Response:
1) Any change in setpoint or controlled variable shall produce a corrective change in position of the final control element and stabilized within 30 seconds.
c. Agreement:
1) Setpoint indication of controlled variable and measured indication of controlled variable shall agree within 3 percent of full scale over a 6:1 operating range.
d. Repeatability:
1) For any repeated magnitude of control signal, from either an increasing or decreasing direction, the final control element shall take a repeated position within 0.5 percent of full travel regardless of force required to position the final element.
e. Sensitivity:
1) Controls shall respond to a setpoint deviations and measured variable deviations within 1.0 percent of full scale.
f. Performance:
1) All instruments and control devices shall perform in accordance with the manufacturers’ specifications.
D. Discrete circuit configuration:
1. Configure discrete control circuits to fail safe, on loss of continuity or loss of power.
2. Alarm contacts: Fail to the alarm condition.
3. Control contacts fail to the inoperative condition unless otherwise indicated on the Drawings.
E. Grounding:
1. Analog signal cables shields shall only be grounded at a single point in the loop. Unless otherwise noted, ground signal cable shields at control panel.
2. For communication and data line signal cable shields and drain wires should be grounded at both ends of the cable.
3. Insulate the shielding and exposed drain wire for each signal cable with heat-shrink tubing.
4. Terminate the signal cable shield on a dedicated grounding terminal block.
5. Provide isolating amplifiers within control panels for field equipment possessing a grounded input or output, except when the panel circuit is galvanically isolated.
2.09 ACCESSORIES
A. Provide flow conditioning devices or other required accessories as needed to meet the accuracy requirements in the Contract Documents.
2.10 MIXES (NOT USED)
2.11 FABRICATION (NOT USED)
Common Work Results for Process Control and Instrumentation Systems 17050-18 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17050 (CONFORMED)
2.12 FINISHES (NOT USED)
2.13 SOURCE QUALITY CONTROL (NOT USED)
PART 3 EXECUTION
3.01 EXAMINATION (NOT USED)
3.02 PREPARATION (NOT USED)
3.03 INSTALLATION
A. The PCIS configurations are diagrammatic:
1. The locations of equipment are approximate unless dimensioned.
2. Where Project conditions require, make reasonable changes in locations and arrangements.
B. Field instruments installation:
1. Install field instruments as specified in the Contract Documents, API RP 550 and RP 551, and the manufacturer’s instructions.
2. Mount field instruments so that they can be easily read, readily approached, and easily serviced, and so they do not restrict access to mechanical equipment:
a. Mount field instruments on a pipe stand or local panel, if they are not directly mounted, unless otherwise indicated on the Drawings. b. Provide sun shields for field electronic instruments located outdoors.
3. Make connections from rigid conduit systems to field instruments with PVC coated flexible conduit:
a. Type of flexible conduit required for the area classification:
1) Area classification as specified in Section 16050 - Common Work Results for Electrical.
b. Maximum length of 18 inches.
4. Connect field instruments with cable as specified in the Electrical Specifications, except when the manufacturer requires the use of special cable, or otherwise specified in this Section:
a. Special cable applications shall be in accordance with the NEC.
5. Verify the correctness of each installation:
a. Polarity of electric power and signal connections.
6. Ensure all process connections are free of leaks.
C. Existing instrumentation:
1. Clean, recondition and re-calibrate each existing instrument to be reused, removed, or reinstalled using an authorized service facility of the instrument manufacturer.
2. Provide certification of this Work before reinstallation of each instrument.
Common Work Results for Process Control and Instrumentation Systems 17050-19 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17050 (CONFORMED) D. Cable and conductor termination:
1. Terminate all cables and conductors on terminal blocks.
2. Terminal block enclosures:
a. Suitable for the area classification as specified in Section 16050 - Common Work Results for Electrical.
E. Surge protection:
1. Provide outdoor field instrument loops with voltage surge protection units installed on the instruments and the panel.
2. Individually fuse each 4 to 20 milliamperes direct current loop with a 1/2-ampere fuse between power supplies and receiver surge protectors.
3. Provide voltage surge protection for 4 wire transmitters and analyzers:
a. Protect both power source and signal loop.
3.04 ERECTION, INSTALLATION, APPLICATION, CONSTRUCTION (NOT USED)
3.05 REPAIR/RESTORATION (NOT USED)
3.06 RE-INSTALLATION (NOT USED)
3.07 COMMISSIONING - GENERAL
A. As specified in Section 01756 - Commissioning and Technical Sections.
3.08 COMMISSIONING - SOURCE TESTING (NOT USED)
3.09 COMMISSIONING - INSTALLATION VERIFICATION (NOT USED)
3.10 COMMISSIONING - FUNCTIONAL TESTING
A. Assist with troubleshooting and correcting instrumentation and control issues.
3.11 COMMISSIONING - SYSTEM TESTING (NOT USED)
3.12 COMMISSIONING - OWNER TRAINING (NOT USED)
3.13 COMMISSIONING - DOCUMENTATION (NOT USED)
3.14 FIELD QUALITY CONTROL (NOT USED)
3.15 ADJUSTING
A. Control valves:
1. Stroke control valves, cylinders, drives and connecting linkages from the control system as well as local control devices and adjust to verify proper control action, hand switch action, limit switch settings, torque settings, remote control actions, and remote feedback of valve status and position.
2. Check control valve actions and positioner settings with the valves in place to ensure that no changes have occurred since the bench calibration.
Common Work Results for Process Control and Instrumentation Systems 17050-20 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17050 (CONFORMED) B. Make revisions necessary to the control system software, as directed by the Engineer.
1. It is understood that the Contractor knows and agrees that changes will be required in the control system software during commissioning.
3.16 CLEANING
A. Vacuum clean control panels and enclosures before process start-up and again after final completion of the project.
B. Clean panel surfaces.
C. Return to new condition any scratches and/or defects.
D. Wipe instrument faces and enclosures clean.
E. Leave wiring in panels, manholes, boxes, and other locations in a neat, clean, and organized manner:
1. Neatly coil and label all spare wiring lengths.
2. Shorten, re-terminate, and re-label excessive spare wire and cable lengths, as determined by the Engineer.
3.17 PROTECTION (NOT USED)
3.18 SCHEDULES (NOT USED)
END OF SECTION
Control Strategies
17100-1 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17100 (CONFORMED) SECTION 17100
CONTROL STRATEGIES
PART 1 GENERAL
1.01 SUMMARY
A. Section includes:
1. Contractor-developed loop description submittal requirements.
2. General programming requirements.
3. Common control functions:
a. General control and monitoring functions to be provided throughout the PCS syste:
1) These requirements apply to all systems and supplement the specific loop descriptions in Section 17101 - Specific Control Strategies and information indicated on the Drawings.
1.02 REFERENCES
A. As specified in Section 17050 - Common Work Results for Process Control and Instrumentation Systems.
1.03 DEFINITIONS
A. As specified in Section 17050 - Common Work Results for Process Control and Instrumentation Systems.
B. Clamp: Imposed upper and lower limits on setpoints to eliminate entries outside the allowable control parameters.
C. Hardwired control: Control circuitry that does not utilize software to initiate functionality.
D. Hardwired interlocks: A safety or protective feature that will interrupt operation of the equipment in all operating modes with no required operator intervention.
E. Historize: To store data collected by a Supervisory Control and Data Acquisition system or Distributed Control system in a Historical Server or Historian for later use in trends and reports.
F. Software interlocks: A safety or protective feature that will interrupt operation of the equipment when the PLC has control.
G. Slew rate: Rate of change in respect to time.
H. Watchdog timer: Timers imposed to test components such as discrete I/O to verify the health of the card.
Control Strategies
17100-2 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17100 (CONFORMED)
1.04 SYSTEM DESCRIPTION (NOT USED)
1.05 SUBMITTALS
A. As specified in Section 17050 - Common Work Results for Process Control and Instrumentation Systems.
1.06 QUALITY ASSURANCE (NOT USED)
1.07 DELIVERY, STORAGE, AND HANDLING (NOT USED)
1.08 PROJECT OR SITE CONDITIONS (NOT USED)
1.09 SEQUENCING (NOT USED)
1.10 SCHEDULING (NOT USED)
1.11 WARRANTY
A. As specified in Section 01783 - Warranties and Bonds.
1.12 SYSTEM START-UP (NOT USED)
1.13 OWNER'S INSTRUCTIONS (NOT USED)
1.14 COMMISSIONING (NOT USED)
1.15 MAINTENANCE (NOT USED)
PART 2 PRODUCTS
2.01 MANUFACTURERS (NOT USED)
2.02 EXISTING PRODUCTS (NOT USED)
2.03 MATERIALS (NOT USED)
2.04 MANUFACTURED UNITS (NOT USED)
2.05 EQUIPMENT (NOT USED)
2.06 COMPONENTS (NOT USED)
2.07 ACCESSORIES (NOT USED)
2.08 MIXES (NOT USED)
2.09 FABRICATION (NOT USED)
2.10 FINISHES (NOT USED)
Control Strategies
17100-3 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17100 (CONFORMED)
2.11 SOURCE QUALITY CONTROL (NOT USED)
PART 3 EXECUTION
3.01 EXAMINATION (NOT USED)
3.02 PREPARATION (NOT USED)
3.03 INSTALLATION (NOT USED)
3.04 ERECTION, INSTALLATION, APPLICATION, CONSTRUCTION
A. As specified in Section 17050 - Common Work Results for Process Control and Instrumentation Systems.
B. General programming requirements:
1. Use variable names or aliases derived from tag and loop identification on the P&IDs for all process values.
a. Submit names for Owner approval.
b. Unless otherwise noted, utilize floating-point format for all PLC algorithms and calculations.
c. Provide PLC logic to convert raw input values into engineering units in a floating-point format.
2. Store all adjustable parameters in the PLC and configure so that an operator with sufficient security access can change the parameters from the LOI or HMI. Update and display the current value at all locations, regardless of where the last change was made.
3. Reusable PLC code blocks:
a. Develop and use new standard user defined function blocks (UDFBs) and user defined types (UDTs) where appropriate. One instance of each standard code block shall reside in each PLC and shall be referenced in main routines and subroutines.
b. New code blocks that the Contractor would like to use as a standard shall be submitted to Owner for review and approval.
c. Provide complete library of standard code blocks to Owner as part of O&M documentation.
4. Documentation:
a. All control logic shall be completely annotated including all rungs, instructions, and tags.
b. Each routine shall have a title and a detailed description of the control strategy represented by the control logic. Where parameters are passed to the routine, all parameters shall be defined in the routine description. c. Analog tag descriptions representing process variables shall include the engineering unit range of the analog variable.
d. Digital tag descriptions shall include the On and Off state labels. e. Complete, grammatically correct sentences and terminology, consistent with water treatment processes, shall be utilized in the development of rung and routine descriptions.
f. All equations developed in the process logic shall be fully documented in the rung or routine description. A description of each constant and
Control Strategies
17100-4 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17100 (CONFORMED) variable utilized in the equation shall be defined including engineering units.
5. Program slew rates for setpoints as needed to limit the effect of updated setpoints on the process:
a. Provide for control setpoints and manual speed and position selections. b. Store new setpoints in one register, and gradually ramp the actual setpoint register at the slew rate until it reaches the new value. c. Provide operator access to change slew rates from the HMI.
6. Saved setpoints:
a. Provide an operator selection to save all setpoint values. b. Furnish 1 or more screens at the HMI that display the initial values for all setpoints defined during start-up and the value for each setpoint the last time they were saved.
c. Where possible use a DFB or AOI to provide an operator selection to restore all setpoints to the initial start-up value.
d. Provide an operator selection to restore all setpoints to the last saved value.
7. Store a copy of all adjustable parameters and accumulated and integrated totals in PCS:
a. Upon re-loading of the PLC program, re-load these values to the PLC from PCS or processor memory card.
b. PLCs provide a minimum 2-week data storage to provide for data accumulation and later communication to the Historian in the event of a network interruption.
8. Calculated values:
a. Program calculations such that division by zero errors cannot occur. b. Prevent calculations from generating values that exceed the limits of the equipment or data type structures (integers) internal to the PLC. c. Configure counting functions (start counts and operation counts) to allow a minimum of 10,000 counts, and to roll-over to zero at an even decimal interval (1 followed by 4 or more zeros).
d. Configure integrating functions to accurately accumulate the maximum rate from the instrument/equipment (totalizers, run time meters) for 30 years. Utilize manufacturer AOI/DFBs etc. where possible.
9. Timers:
a. Provide programmable settling and proving timers in control sequences as required for starting and stopping of equipment to allow the process to settle to a steady state before proceeding with any additional control functions.
1) The settling timers may be overridden by setting the timer to 0 seconds.
10. Control Panel status:
a. Design the PLC system to function as a stand-alone unit that performs all of the control functions described in this Section completely independent from the functions of the PCS system PC-based operator interfaces:
1) Failure of the PCS system shall not impact data acquisition, control, scaling, alarm checking, or communication functions of the PLC. b. Furnish a minimum of 1 screen that depicts the status of all enclosures containing PLCs, communication equipment, UPS or I/O in the control system, including but not limited to the following:
1) PLC cabinet over-temperatures from high temperature switch.
Control Strategies
17100-5 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17100 (CONFORMED) 2) Intrusion status on all enclosures equipped with intrusion switches. 3) AC power failure:
a) Monitor ahead of UPS.
4) DC power supply failure:
a) For redundant power supplies, alarm when either power supply or the diode bridge fails.
5) UPS failure signal.
6) UPS Low Battery signal.
7) Digital bus network Coupler and or Gateway failure signal. 8) Ethernet Switch failure signal.
11. PLC system communication status:
a. Furnish a minimum of 1 screen to display all communication errors and status within the PCS:
1) Communication between PCS and PLCs, PLC to PLC, PLC to RIO and PLC and or PCS to VCP.
2) 4-20 mA HART interface cards.
3) Digital bus network status:
a) Profibus scanners.
4) Modbus Gateway modules.
5) Display status of each node, and summary of failures over the past 60 minutes.
b. Generate a communications alarm if any communication fault is detected or there is no response from a node for more than a user specified time. c. In the event of communications loss:
1) Continue normal operation at each PLC.
2) Where control parameters are received over a communications link:
a) If a link fails where process elements use the remote value for closed-loop control, hold operating status, speed and position, of the process elements at their last state before the
communication alarm, unless other I/O local to that PLC indicates shutdown or over-ride conditions:
(1) Ensure that the operator can control the process using PCI\S HAND mode at the local LOI.
b) If a link fails where process elements use the remote value to determine setpoints, continue to operate using the last value received:
(1) Provide a manual over-ride entry at the local LOI to allow an operator to enter a different value for any such remote signal.
(2) Generate an alarm whenever an over-ride value is in use.
12. 4-20 mA Hart interface cards:
a. Provide the following HART protocol information for each populated channel on the card:
1) Process variable values:
a) Primary process variable (analog): 4-20 mA current signal. b) Primary process variable (digital): Digital value in engineering units.
c) Percent range: Primary process variable expressed as percent of calibrated range.
Control Strategies
17100-6 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17100 (CONFORMED) d) Loop current: Loop current value in milliamps.
e) Secondary process Variable 1: Digital value in engineering units available from multivariable devices (if applicable).
2) Host commands:
a) Set primary variable units.
b) Set upper range.
c) Set lower range.
d) Set damping value.
e) Set message.
f) Set tag.
g) Set date.
h) Set descriptor.
i) Perform loop test: Force loop current to specific value. j) Initiate self-test: Start device self-test.
k) Get more status available information.
3) Status and diagnostic alerts:
a) Device malfunction: Indicated device self-diagnostic has detected a problem in device operation.
b) Configuration changed: Indicates device configuration has been changed.
c) Cold start: Indicates device has gone through power cycle. d) More status available: Indicates additional devices status data available.
e) Primary variable analog output fixed: Indicates device in fixed current mode.
f) Primary variable analog output saturated: Indicates 4-20 mA signal is saturated.
g) Secondary variable out of limits: Indicates secondary variable value outside the sensor limits.
h) Primary variable out of limits: Indicates primary variable value outside the sensor limits.
4) Device identification:
a) Instrument tag: User defined, up to 8 characters.
b) Descriptor: User defined, up to 16 characters.
c) Manufacturer name (code): Code established by HCF and set by manufacturer.
d) Device type and revision: Set by manufacturer.
e) Device serial number: Set by manufacturer.
f) Sensor serial number: Set by manufacturer.
5) Calibration information:
a) Date: Date of last calibration, set by user.
b) Upper range value: Primary variable value in engineering units for 20 mA point, set by user.
c) Lower range value: Primary variable value in engineering units for 4 mA point, set by user.
d) Upper sensor limit: Set by manufacturer.
e) Lower sensor limit: Set by manufacturer.
f) Sensor minimum span: Set by manufacturer.
g) PV damping: Primary process variable damping factor, set by user.
Control Strategies
17100-7 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17100 (CONFORMED) h) Message: Scratch pad message area (32 characters), set by user.
i) Loop current transfer function: Relationship between primary variable digital value and 4-20 mA current signal.
j) Loop current alarm action: Loop current action on device failure (upscale/downscale).
k) Write protect status: Device write-protect indicator.
C. Common control functions:
1. Incorporate common control functions into all control loops and devices and into the control programming, whether or not specifically shown in the specific control descriptions or elsewhere in the Contract Documents.
2. Alarms:
a. Generate alarms within the PLC logic.
b. Indicate alarms at the LOI and HMI. Enable acknowledgement from either the HMI or the LOI.
c. Generate high, high-high, low, and low-low level alarms where indicated:
1) Provide an alarm reset deadband for each analog value to prevent excessive repeated alarms.
2) Provide logic and timers to inhibit analog alarms based on process events. For example, inhibit low flow alarms when a pump is stopped, or has not been running long enough to establish flow. d. Flash all alarm and fail conditions and their respective indicators on the PCS graphic screens and local indicating lights until the condition is acknowledged by the operator, even if the alarm condition is no longer present.
e. Once the alarm is acknowledged by an operator, display alarm conditions in a steady state (not flashing) while the alarm condition is still present:
1) Flash with a cycle rate of 1/2 second on and 1/2 second off. f. Once the alarm has been cleared and the operator has acknowledged the alarm or fail condition, turn the graphic alarm indicator off. g. For all alarms that do not have inherent timers, provide an operator-adjustable proving timer to limit nuisance alarms, continuously adjustable from zero seconds to 100 minutes. The initial setting of proving timers shall be zero seconds:
1) The PLC shall start the timer when it first detects an alarm condition and shall only activate the alarm after the timer has expired. 2) If the alarm condition clears while the timer is running, the timer shall reset, and the alarm shall not be activated.
h. Use interlocks and proving timers to prevent alarms from operating due to power loss, except for loss of power alarms.
i. Furnish an alarm silence pushbutton at each PCM, LOI, or LCP with an audible alarm to signal the PLC to turn off the audible alarm until the next alarm occurs.
j. Lamp test: Furnish lamp test pushbuttons at each control panel with more than 10 pilot lights, that illuminates all pilot lights on the panel:
1) The lamp test may sequence through blocks of lights. 2) Minimum on time for each lamp during lamp test 15 seconds. k. Horns and Beacons:
1) Activate PCM horn and beacon on all critical alarms and on other alarms as defined by the Facility Alarm Philosophy.
Control Strategies
17100-8 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17100 (CONFORMED) 2) Deactivate PCM horn and beacon when PCM reset pushbutton is activated.
3) Silence PCM horn when PCM silence pushbutton is activated. l. Dual analog instruments:
1) For applications where 2 or more analog instruments are measuring the same process variable:
a) Generate an operator adjustable percent deviation alarm. b) Allow operator to take each instrument out of service when an instrument is out of service.
3. Where a reset is shown for counts, totals and times maintained in the PLC:
a. Provide a reset selection on the HMI screen that displays the value. b. Provide a preset function on the HMI to allow an operator-entered value to become the current accumulated total.
c. Limit access to the reset and preset functions to operators with suitable security level.
d. Log the value before reset, operator, time, and date of reset in the PCS archive.
e. Log the value before preset, preset value, operator, time, and date of preset in the PCS archive.
4. Where start counts are indicated on the Drawings, or required in this Section, count starts for each piece of equipment (off to on transitions of running status) in the PLC:
a. Display total starts on PCS screens and provide a reset function. b. Where indicated, calculate number of starts for each day:
1) Display current day and previous day starts on PCS displays. 2) Do not reset daily start count when overall count is reset. 3) Archive starts for each day through PCS.
5. Where run time accumulation is indicated on the Drawings, or required in this Section, integrate accumulated run time to the nearest 0.1 hour whenever the running status input indicates that the equipment is running:
a. Display total run time in hours on PCS screens.
b. Where indicated, calculate total run time for each day:
1) Display current day and previous day run time on the HMI to the nearest 0.1 hour.
2) Do not reset daily run time when overall time is reset. 3) Archive run time for each day through PCS.
6. For all monitored analog values:
a. Convert all values to engineering units in floating-point format within the PLC.
b. Maintain trends in PCS.
1) Display minima and maxima on the HMI, and archive through PCS. c. Flows and Weights:
1) Totalize flows in the PLC logic:
2) Where totalized flows are input to a discrete input, count input pulses and multiply by the volume per pulse.
3) Where no totalizer input is shown, integrate the analog input over time.
4) Display totals on the HMI and LOI.
5) Archive totals to the historical database through PCS. d. Generate an alarm whenever an over-ride value is in use.
Control Strategies
17100-9 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17100 (CONFORMED) e. Calculate hourly, daily, and monthly averages:
1) Calculations shall be performed by the PLC.
2) Display averages on the HMI, and archive through PCS. 3) Display minima and maxima on the HMI, and archive through PCS. f. Calculate minimum and maximum values each day, and month:
1) Calculations may be performed by the PLC or PCS.
2) Display minima and maxima on the HMI, and archive through PCS.
7. Analog data processing:
a. Engineering units conversion:
1) Use engineering units for all analog point values. Convert analog inputs to engineering units.
b. Analog magnitude checking:
1) Provide upper and lower limits to prevent operator-entered values (setpoints, etc.) from falling outside acceptable limits. c. Analog value quality:
1) Monitor analog values received at each PLC from analog inputs or communications from another PLC or RIO specific to critical analog values, and generate alarms for the following conditions:
a) Rate of change in excess of acceptable limit:
(1) Provide a separate rate limit for each value.
b) Stale value:
(1) For analog signals that come from analog inputs or
calculations using analog inputs, which are expected to have some variation each time the input is read, alarm
when there is no change in the value for 10 times the
normal expected scan or communication update.
8. Analog device override (LOI and HMI):
a. Provide the following functions from the HMI and the local LOI all controlling analog input:
1) An over-ride value to be used in place of the analog input:
a) Enter in engineering units:
(1) Display the calibrated range in engineering units.
(2) Only allow entries within the calibrated range of the instrument.
b) When the analog input is enabled, track the analog input so that the over-ride matches the analog input value when the input is initially disabled.
c) Maintain over-ride status and value in the PLC.
d) Only allow access to over-ride selections and settings to operators with sufficient security.
2) An enable/disable selection:
a) When enabled, the value used by the PCS system is equal to the analog input value.
b) When disabled, the analog input is ignored, and the over-ride value is used for all control and display functions.
c) Generate an alarm whenever an analog input is disabled. d) Enter a value for the analog input from the PCS system to the PLC.
3) Use the over-ride value for all display and control functions instead of the actual analog input value.
Control Strategies
17100-10 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17100 (CONFORMED) b. Provide the following functions in the PLC, with selections and value entry from the HMI and/or LOI:
1) An over-ride value to be used in place of the normal output value:
a) Enter in percent of output span.
b) When the analog output is enabled, track the analog input so that the over-ride matches the analog output value when the output is initially disabled.
2) An enable/disable selection:
a) When enabled, the value sent to the output is the value determined by the PLC based on the control logic or
operator-entered value in PCS HAND.
b) When disabled, the calculated PCS HAND values are ignored, and the over-ride value is sent to the output.
c) Generate an alarm whenever an analog output is disabled.
9. Tank and vessel levels:
a. Display all tank and vessel levels as both a level (typically in feet) and a volume (typically in gallons):
1) Some individual displays may be only level or volume, when agreed to by the Owner and Engineer during screen review meetings. b. Monitor rate of change of volume on all tanks and vessels:
1) Establish the maximum withdraw rate at which the volume should decrease (all pumps or feeders operating at maximum output).
Generate an alarm whenever the volume decreases faster than this rate.
2) Establish the maximum fill rate at which the volume should increase when filling. Generate an alarm whenever the volume increases faster than this rate. Verify tank and vessel level is fluctuating to verify the validity of the IO register. If it is determined the register is not active or failed in a manner that leaves a stagnant value generate an alarm.
10. I/O filtering and processing:
a. Analog input filtering:
1) For each analog input provide an adjustable first order filter, for the purpose of smoothing out spikes and other noise for analog transmitter input signals. By default, configure analog inputs with no filtering affect.
2) Monitor analog input signal quality:
a) Over range: The input value is above the normal range (typically over 21 mA).
b) Under range: The input value is below the normal range (typically under 3 mA, indicating a probable broken connection). c) Generate alarms for over or under range inputs.
d) Do not use over or under range values for control or calculation purposes:
(1) Where a second instrument is provided to monitor the same condition (a redundant instrument, or additional instruments furnished for averaging or different operating modes), and has a valid signal, use that input for control.
Control Strategies
17100-11 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17100 (CONFORMED) 3) Digital input filtering (proving timer):
a) Provide an adjustable time delay function (0-10 seconds) on discrete input for the purpose of de-bouncing.
b) By default, discrete inputs shall be configured with de-bounce timers set to zero seconds.
11. Instrument scaling (HMI/LOI):
a. Provide 1 or more maintenance screens to display ranges and trigger points for all field instruments:
1) For analog instruments, use input scaling values in the PLC to determine minimum and maximum calibration points.
2) For discrete instruments, display calibrated pick-up and drop-out values.
12. PCS HAND-OFF-AUTO:
a. Where indicated, provide HAND-OFF-AUTO and START-STOP selections in the PCS, accessed from an LOI or HMI for operators with sufficient security, to provide the following operating modes:
1) PCS AUTO: The normal, automatic control mode of the strategy which allows full PLC control in response to process conditions and programmed sequences.
2) PCS HAND: Enables PCS Manual control where control decisions are made by an operator through the PCS START-STOP,
OPEN/CLOSE, or other selections as indicated.
3) PCS OFF: Automated PCS control is disabled, and PLC calls for all associated equipment to stop and valves to close or go to their identified safe state.
4) Program the PLC so that switching a strategy between AUTO and HAND (either direction) occurs with a smooth transition. Keep running or position status unchanged when control is switched to HAND until a change is requested using the operator selections (START, STOP, OPEN, CLOSE). Keep running and position status unchanged when control is switched to AUTO until the control logic determines a change is required.
13. Display the current status of all operator selections (PCS HAND/AUTO, PCS START/STOP, etc.) on LOI and HMI.
14. Interlocks:
a. Implement software interlocks where indicated to place equipment in a safe condition in response to impending hazardous process conditions.
Apply software interlocks when equipment is operating in PCS AUTO or PCS HAND:
15. Permissives:
a. Implement software permissives where indicated to prevent equipment from starting in an unsafe condition.
b. Apply software permissives when equipment is operating in PCS AUTO or PCS HAND.
16. Process control algorithms:
a. Jog and hold:
1) When the error between process variable and setpoint is beyond a setpoint deadband:
a) Jog valve or ramp speed in the required direction for a preset “Jog Time” or until the process variable reaches or passes the setpoint.
Control Strategies
17100-12 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17100 (CONFORMED) b) Then hold speed or position through a setpoint “Hold Time.” c) Continue alternating jog and hold until the error is less than the deadband.
2) Provide operator access to Jog Time and Hold Time setpoints from the HMI.
b. PID algorithms:
1) Provide a PID faceplate with the following displays and functions for each PID control algorithm:
a) Display Output, CV.
b) Display Setpoint, SP.
c) Display Process Variable, PV.
d) Allow for operator selection of Automatic or Manual control of the output.
e) Under Manual control of output allow the operator to enter the desired output value.
f) Allow for input of the 3 Proportional, Integral, and Derivative tuning parameters.
g) Configure PID loops to prevent reset windup when controlled equipment is operating in Manual (local or PCS), or when the equipment has reached a physical limit.
h) When controlled equipment is being operated in remote PCS HAND, configure the PID function to track the process variable to provide a smooth transfer between Manual and Automatic modes.
i) Provide selectable slew rates with adjustable setpoints to allow the PID algorithm to slowly ramp to its final value to minimize system disturbance.
17. Equipment alternating and sequencing:
a. Distribute number of starts and run time equally between identical equipment.
b. Where multiple pieces of equipment are used to control a single process variable, alternating of lead and lag equipment assignments is done as follows:
1) Automatic Lead/Lag equipment selection:
a) The control system automatically selects the lead equipment and next lag equipment based on the lowest run time hours of the equipment.
b) When multiple equipment are running, the control system determines which equipment to stop next based on the running equipment with the highest run time hours.
c) A weighted run time factor can be assigned to each individual piece of equipment.
(1) The weighting factor is a percentage from 1-100 percent that is multiplied by the actual run time hours of the
equipment to create a weighted run time hours of the
equipment.
(2) The weighted run time hours of each piece of equipment are then used by the algorithms that select the equipment that will start or stop next.
Control Strategies
17100-13 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17100 (CONFORMED) (3) This is to allow for specific equipment to accrue more run time hours so that all pumps do not reach their maximum run time hours at approximately the same time.
(a) Display both the weighted and actual runtime hours on the PCS screen.
2) Manual Lead/Lag selection:
a) The operator will assign the Lead, “Next Lag” equipment through a selection matrix in the HMI.
b) When modifying this matrix, modifications shall not become active until an “ACCEPT ALL” software pushbutton is activated. c) Provide a “CANCEL ALL” software pushbutton to clear all modification of the selection matrix and revert them to the last accepted changes.
18. Motor control:
a. Monitor the device’s LOCAL-OFF-REMOTE (LOR) switch (the hard-wired switch at the MCC, drive or equipment) to determine when the PLC has control of the associated equipment:
1) Display current REMOTE status on the PCS screens.
b. Monitor the device’s running status from the starter auxiliary or run status input:
1) Display the current status (running or stopped) on the PCS screens. 2) Use status to calculate total run time and daily run time, and to count total starts and daily starts.
3) Provide time stamp for each start.
4) For motors 200 HP and greater, provide software to prevent exceeding the manufacturer’s recommended maximum starts per hour.
c. When equipment control has been given to the PLC as reported by the LOCAL-OFF-REMOTE switch, allow selection of PCS AUTO or PCS HAND control modes based upon operator selection using the PCS screens.
d. Starting, stopping and running when the device LOR is in LOCAL:
1) With the LOR switch in the LOCAL position, the motor is controlled by the START and STOP pushbuttons.
2) With the LOR switch in the OFF position, the motor is prohibited from running.
3) With the LOR switch in the REMOTE position, the motor is controlled remotely.
e. Starting, stopping and running when the device LOR is in REMOTE:
1) When the motor is expected to be running (PLC has issued a START or RUN due to process conditions or operator selection), LOR is in REMOTE, and the device is not reported to be running, start an operator adjustable “Control Activation” timer:
a) Provide “Control Activation” timers for each piece of controlled equipment:
(1) If the LOR and required running status do not change, and the PLC does not receive running status within the “Control Activation” time period:
(a) De-activate the output.
(b) Place the device in a “Failed” state.
(c) Generate a “Failed to Respond” alarm.
Control Strategies
17100-14 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17100 (CONFORMED) 2) When the motor is not expected to be running (PLC has issued a STOP or removed the RUN output), LOR is in REMOTE, and the device is reported to be running, start the “Control Activation” timer:
a) If the LOR and required stopped status do not change, and the PLC does not lose the running status within the “Control Activation” time period:
(1) Keep the RUN output off or the STOP output on.
(2) Place the device in a “Failed” state.
(3) Generate a “Failed to Respond” alarm.
3) Re-establish PLC control of a device in a “Failed” state only after the following:
a) An operator turns the device’s LOR switch out of REMOTE, and back to REMOTE (i.e., REMOTE input to the PLC cycles off and back on).
b) An operator acknowledges the fault from PCS.
f. Where motor winding high temperature switches or RTD temperature elements are shown, generate an alarm when high temperature is sensed (contact opens or temperature above the high alarm setpoint), but do not stop the motor unless otherwise indicated.
g. Motor equipped with current detection shall shut down and report a “failed” status on detection of high current.
h. Control two-speed motors similar to other motors, except as listed below:
1) Motor states are RUN-FAST, RUN-SLOW, and STOP.
2) Start all two-speed motors in the RUN-SLOW state. If or when the high speed is required (RUN-FAST operator selection or process conditions), transition to RUN-FAST after a designated time. 3) When transitioning from RUN-FAST to RUN-SLOW, remove the RUN-FAST output or issue a STOP, then wait for a “Fast to Slow” time delay before energizing the RUN-SLOW or START-SLOW output.
i. Simultaneous starts:
1) Prevent more than one motor-driven load 25 HP or larger in the same facility from starting concurrently:
a) When starting one load, inhibit start logic for all other such equipment until the load being started is up to speed (RVSS or VFD), or after a setpoint time delay (full-voltage starters and miscellaneous equipment).
j. Speed control:
1) Modulate speed on VFD-driven motors using jog and hold, or PID control algorithms to maintain process conditions as described in the specific loop descriptions.
2) Operate speed control within a pre-defined range:
a) Minimum speed as determined by equipment manufacturer. The higher of:
(1) Minimum motor speed to maintain adequate cooling for the type of load driven (constant or variable torque).
(2) Minimum equipment speed, such as minimum speed to
deliver flow or to deliver minimum flow for equipment
cooling or lubrication.
b) Maximum speed 100 percent (60 hertz) or as identified by equipment manufacturer.
Control Strategies
17100-15 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17100 (CONFORMED) 3) Where multiple equipment may operate together to maintain the same process condition, alternatively referred to as “Lead/Lag”:
a) Start the first equipment at a preset starting speed. b) When 1 or more equipment is running and the speed control algorithm reaches a preset “Start Next” speed value (initially 95 percent of speed range) through a preset time delay:
(1) Start the next available equipment at the preset starting speed.
(2) Ramp up the started equipment and ramp down the
previously running equipment to the mid operating speed (adjustable in the PLC). Determine preset values for each condition based on equipment and system characteristics to provide approximately the same total flow or process condition with the new load running at the mid speed (for example if one pump is running and the second pump will be added, then the total flow of both pumps running at mid operating speed should be approximately the same as flow of one pump at Start Next speed).
(3) Once both equipment reach the mid operating speed,
resume the speed control algorithm for those equipment. (4) Operate all equipment at the same speed following the output of the speed control algorithm.
c) When two or more pieces of equipment are running, monitor for a “Stop Next” condition:
(1) Where flow rate is monitored, use a preset “Stop Next” flow rate for each possible number and combination of
equipment:
(a) Determine initial “Stop Next” speed based on the flow that can be provided with one fewer piece of
equipment running at a speed slightly below the “Start
Next” speed.
(2) When the “Stop Next” condition exists through a preset time delay:
(a) Ramp speed of running equipment except for the
equipment to be stopped up to a preset value based
on the number of items running. Determine preset
values for each condition based on equipment and
system characteristics to provide approximately the
same total flow or process condition with one fewer
load running (typically slightly below the preset “Start Next” speed) while ramping speed of equipment to be
stopped down to the preset minimum speed.
(b) Operate all remaining equipment at the same speed
following the output of the speed control algorithm.
Stop the load once it reaches minimum speed.
19. Gate and valve control:
a. Monitor the device’s LOCAL-STOP-REMOTE (LSR) switch(es) (the integral switch in the actuator or hard-wired switch at the local control station):
1) Display current REMOTE status on PCS screens.
Control Strategies
17100-16 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17100 (CONFORMED) b. Start an “Open Activation” timer whenever the device is expected to be open (PLC has issued an OPEN command in PCS AUTO, or OPEN was selected in PCS HAND):
1) Initially set “Open Activation” time to twice the normal opening time. 2) If the LSR position and open command do not change, and the PLC does not receive fully open status feedback within the “Open Activation” time period:
a) De-activate the open output.
b) Place the device in a “Failed” state.
c) Generate a “Failed to Open” alarm.
c. Start a “Close Activation” timer whenever the device is expected to be closed (PLC has issued a CLOSE command in PCS AUTO, or CLOSE was selected in PCS HAND):
1) Initially set “Close Activation” time to twice the normal closing time. 2) If the LSR position and close command do not change, and the PLC does not receive fully closed status feedback within the “Close Activation” time period:
a) De-activate the close output.
b) Place the device in a “Failed” state.
c) Generate a “Failed to Close” alarm.
d. Limit the number of open/close /commands so that it does not exceed the manufacturer requirements.
e. For modulating valves (valves controlled from either a 4-20 mA signal or digital communications command) with position feedback, start a “Position Error” timer whenever the position feedback differs from the required position command by more than a setpoint error when the LSR is in REMOTE:
1) For analog modulating devices, error is determined by position feedback differing from position command by more than the setpoint error.
2) For discrete modulating devices, error is determined by feedback not changing in the correct direction, or changing at less than a setpoint rate, when the OPEN or CLOSE PLC output is active.
3) Initially set the “Position Error” time to 60 seconds. 4) If the LSR position does not change, and position error stays outside of the setpoint error through the “Position Error” time period:
a) Place the device in a “Failed” state.
b) Generate a “Position Fail” alarm.
f. Provide separate time delay settings for each function and for each device.
g. If the valve position inputs indicate an invalid state (i.e., valve open and closed at the same time), place the device in a “Failed” state and generate an “Invalid State” alarm.
h. Re-establish PLC control of a device in a “Failed” state only after the following:
1) An operator turns the device’s LSR switch out of REMOTE and back to REMOTE (i.e., REMOTE input to the PLC cycles off and back on). 2) An operator acknowledges the fault from PCS.
i. For all alarm conditions, control other devices (as stopping pumps, etc.) as stated in the individual loop descriptions to make the system safe.
Control Strategies
17100-17 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17100 (CONFORMED) j. For discrete modulating valves (valves positioned to intermediate positions to control process values through discrete OPEN and CLOSE outputs), count the number of actuations (OPEN or CLOSE commands) per hour in the PLC:
1) Display count on the HMI.
20. Chemical systems (LOI/HMI):
a. Provide the following chemical system screens:
1) Where one LOI manages more than one chemical system, a main menu screen that will allow the operator to access the individual chemical system screens using software keys.
2) One or more screens for each individual chemical system controlled at that location, containing:
a) All status displays (running, failed, etc.).
b) Selections (lead/lag, which process flow to pace to, etc.). c) Setpoint entry and display.
d) Calculated feed requirement (result of flow pacing calculation) in engineering units (typically milligrams of chemical per minute). e) Output signal to feeder in percent of full span.
f) Actual chemical flow rate from flowmeter (where shown). g) Process flow rate(s) used to pace each chemical on the individual chemical screens (PROC FLOW):
(1) Where different process flows can be selected for flow pacing, display and identify the selected source.
b. Chemical system calculations: Perform calculations as indicated on the Drawings and in the individual loop descriptions. Use the following assumptions, unless otherwise noted:
1) Where chemical flow feedback is not used, assume feeder output is linear in response to control signal.
2) Zero signal (typically 4 milliamperes) produces zero flow. 3) Perform flow-pacing calculations using as indicated on the Drawings or described in the individual loop descriptions.
c. Provide the setpoints and selections indicated on the Drawings and in the individual loop descriptions. Typical setpoints include:
1) QMAX: Maximum calibration value:
a) Chemical flow rate measured from calibration column at maximum feeder output (typically in gallons of solution per hour or milliliters of solution per minute).
2) CONC: Chemical concentration:
a) The concentration of the chemical in the solution to be fed, in engineering units (typically milligrams of chemical per liter of chemical solution).
3) DENSITY:
a) Density of the chemical solution to be fed in engineering units or as a specific gravity.
b) Used to calculate the concentration of the chemical in the solution.
4) DOSE: Desired dosage:
a) Desired chemical concentration in the process stream in engineering units (typically milligrams of chemical per liter of process fluid).
5) FLOW SEL: Selection of process stream(s) for flow pacing.
Control Strategies
17100-18 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17100 (CONFORMED) 6) OPEN/CLOSED LOOP:
a) Selection of method of controlling chemical flow-paced feed rate.
b) OPEN LOOP: Signal to feeder is based on feeder calibration (QMAX) to deliver calculated chemical solution feed rate.
Chemical solution flowmeter is not used for control.
c) CLOSED LOOP: Chemical feed rate is directly controlled using the calculated chemical solution feed rate as the setpoint, and the flow rate from the chemical solution flowmeter as the process variable.
7) TRIM FACTOR: refer to the equations below.
d. Chemical control algorithms:
1) Flow pacing algorithm: Operator selects a desired dose and the control system adjusts the chemical feed rate to dose based on process flow, chemical concentration, and feeder calibration. The calculation is as follows (units may vary from those shown in the calculation below):
𝑄𝑄𝐶𝐶 = 𝐷𝐷 ⋅ 𝑄𝑄𝑓𝑓 ⋅ 8.34
24 ⋅ 𝐶𝐶 ⋅ 𝑝𝑝
Where,
QC = Chemical Pump flow Rate command (gal/hr)
Qf = Process Flow (MGD) Measurement
D = Dose setpoint (mg/L) User Adjustable
p = Chemical Density (lbs/gal)
C = Chemical Concentration (ratio in decimal format. For example, use 0.25 for 25 percent chemical solution)
8.34 = conversion factor ([lbs • L]/[MG • day • mg])
24 = conversion factor days to hours
𝑆𝑆 =
𝑄𝑄𝐶𝐶
𝑄𝑄𝑚𝑚𝑚𝑚𝑚𝑚
Where,
S = Pump Speed control setpoint (0 to 100 percent)
QC = Flow setpoint from equation above (gal/hr)
Qmax = Maximum Pump Flow setpoint (gal/hr) based on calibration column test.
2) Flow pacing with closed loop algorithm: Operator selects a desired dose and the control system adjusts the speed of the chemical feeder through a speed control signal to match the measured chemical feed rate to a flow rate setpoint. This flow rate setpoint shall be derived from the process flow and operator setpoints for dosage and concentration. The calculation is as follows (units may vary from those shown in the calculation below):
𝑄𝑄𝐶𝐶 = 𝐷𝐷 ⋅ 𝑄𝑄𝑓𝑓 ⋅ 8.34
24 ⋅ 𝐶𝐶 ⋅ 𝑝𝑝
Control Strategies
17100-19 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17100 (CONFORMED) Where,
QC = Chemical Pump flow Rate command (gal/hr)
Qf = Process Flow Measurement (MGD)
D = Dose setpoint (mg/L) User Adjustable
p = Chemical Density (lbs/gal)
C = Chemical Concentration (ratio in decimal format. For example, use 0.25 for 25 percent chemical solution)
8.34 = conversion factor ([lbs • L]/[MG • day • mg])
24 = conversion factor days to hours
a) The speed of the chemical feed pump shall be determined by the output of a PID controller. The setpoint of the PID controller shall be the result of the equation in the paragraph above. The process variable (feedback) shall be the chemical flow (not process flow) as measured by a flow meter.
3) Flow pacing with analyzer trim algorithm: Operator selects a desired dose and desired analyzer setpoint band and the control system adjusts the chemical feed rate to dose based on process flow, chemical concentration, process analyzer output, and feeder calibration. The calculation is as follows (units may vary from those shown in the calculation below):
𝑄𝑄𝐶𝐶 = �
𝐷𝐷 ⋅ 𝑄𝑄𝑓𝑓 ⋅ 8.34
24 ⋅ 𝐶𝐶 ⋅ 𝑝𝑝 � 𝑇𝑇
Where,
QC = Chemical Pump flow Rate command (gal/hr)
Qf = Process Flow Measurement (MGD)
T = Trim Factor (ratio)
D = Dose setpoint (mg/L) User Adjustable
p = Chemical Density (lbs/gal)
C = Chemical Concentration (ratio in decimal format. For example, use 0.25 for 25 percent chemical solution)
8.34 = conversion factor ([lbs • L]/[MG • day • mg])
24 = conversion factor days to hours
𝑆𝑆 =
𝑄𝑄𝐶𝐶𝐶𝐶2
𝑄𝑄𝑚𝑚𝑚𝑚𝑚𝑚
Where,
S = Pump Speed control setpoint (0 to 100 percent)
QCL2 = Flow setpoint from equation above (gal/hr)
Qmax = Maximum Pump Flow (gal/hr) based on calibration column test.
a) The trim multiplier shall be controlled by the output of a PID controller initially scaled between 0.8 and 1.2, adjustable. The setpoint of the PID controller shall be an operator adjustable target residual or desired analytical value. The process variable (feedback) of the PID controller shall be measured residual or analytical value.
Control Strategies
17100-20 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17100 (CONFORMED) 4) Flow pacing with closed loop and analyzer trim algorithm: Operator selects a desired dose and desired analyzer setpoint band and the control system adjusts the speed of the chemical feeder through a speed control signal to match the measured chemical feed rate to a flow rate setpoint. An additional control algorithm is used in the calculation to fine-tune the feed based on an analytical measurement as measured by the process analyzer.
𝑄𝑄𝐶𝐶 = �
𝐷𝐷 ⋅ 𝑄𝑄𝑓𝑓 ⋅ 8.34
24 ⋅ 𝐶𝐶 ⋅ 𝑝𝑝 � 𝑇𝑇
Where,
QC = Chemical Pump flow Rate command (gal/hr)
Qf = Process Flow Measurement (MGD)
T = Trim Factor (ratio)
D = Dose setpoint (mg/L) User Adjustable
p = Chemical Density (lbs/gal)
C = Chemical Concentration (ratio in decimal format. For example, use 0.25 for 25 percent chemical solution)
8.34 = conversion factor ([lbs • L]/[MG • day • mg])
24 = conversion factor days to hours
a) The trim multiplier shall be controlled by the output of a PID controller initially scaled between 0.8 and 1.2, adjustable. The setpoint of the PID controller shall be an operator adjustable target residual or desired analytical value. The process variable (feedback) of the PID controller shall be measured residual or analytical value.
b) The speed of the chemical feed pump shall be determined by the output of a PID controller. The setpoint of the PID controller shall be the result of the equation in the paragraph above. The process variable (feedback) shall be the chemical flow (not process flow) as measured by a flow meter.
e. Virtual day tanks:
1) Chemical systems without actual day tanks will have their own “virtual” day tank, which will use either a pre-set volume (operator adjustable) or a calculated daily use rate based on the totalized flow (volume) of the chemical magnetic flowmeters over the virtual day tank cycle. The “virtual” day tank will start at the pre-set volume or the calculated volume (operator-selectable) and based on the storage tank level, the volume in the “virtual” day tank will decrease until the total “volume” in the virtual day tank is used. The virtual day tank will automatically compensate for any changes in the system due to the use of the dilution system (revised solution concentration).
Once this occurs, the operator will be provided with a “pop-up” screen stating that the “virtual” day tank volume is used. Once this occurs, the operator will be provided with a “pop-up” screen stating that the virtual day tank needs to be refilled. The pop-up screen will contain the following information:
a) Time {hours and minutes} since the last day tank filling.
Control Strategies
17100-21 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17100 (CONFORMED) b) Volume utilized in the “virtual” day tank (based on the level transmitter measuring the chemical storage tank).
c) Dose {mg/L} based on the average flow rate over the “virtual” day tank cycle.
d) Target dose {mg/L} based on operator input.
2) Provide a double check using the actual flowmeter values to compare with the calculated dose. Compared the magnetic flowmeter value with the calculated dose. The magnetic flowmeter value will be based on an hourly average of chemical flow rate over the day tank cycle.
3) As an added level of control any chemical system that has an analyzer used for feedback will be tracked and alarmed if outside the operating parameters.
4) Alarm if any condition falls outside of the flow, or level parameters.
21. Breaker status:
a. Display the following data to the extent it is available from the specified device:
1) Open.
2) Closed.
3) Tripped.
4) Ground fault.
5) Settings.
6) Racked out.
22. Power Data:
a. Retrieve data from:
1) Power Quality Meters (PQMs) at 480V.
2) Main Breaker Protective Relays on 12.47 kV Switchgear. 3) Generator Master Control Panel.
4) Digital bus networks, as indicated.
5) Where available, use EtherNet IP communications.
b. Display the following data (to the extent it is available) from the specified device.
1) Current XXXX.X A:
a) A-Phase.
b) B-Phase.
c) C-Phase.
2) Volts: XXXX.X V:
a) A-Phase.
b) B-Phase.
c) C-Phase.
3) Reactive power: XXXX.X kVAR.
4) Real power: XXXX.X kW.
5) Apparent power: XXXX.X kVA.
6) Power factor: 0.XX.
7) Energy: XXXXXXX kW*hr.
8) Demand peak: XXXX Amp.
9) Demand peak: XXXX kW.
c. For engine/generator system monitoring, also display percent of rated output.
Control Strategies
17100-22 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17100 (CONFORMED)
23. Power Supply and Distribution displays Power Quality Meters display:
a. In addition to the Power Data listed above, display the following (where available) from PQMs, Protective Relays, and Generator Master Control Panel:
1) Frequency: Hertz.
2) THD (current and voltage): up to 31st harmonic.
b. Calculate, indicate, historize, and trend data in a 12.47 kV Meter Table that lists measurements from the following Protection Relays:
1) Protection Relay on 52-G1.
2) Protection Relay on 52-G2.
3) Protection Relay on 52-M1.
4) Protection Relay on 52-M2.
5) Protection Relay on 52-M3.
6) Display calculated values for "Load At 12.47 kV", which sums the current, kW, and kW-hr values for all five Protection Relays. 7) Display calculated values for "Load At 480V", which sums the current, kW, and kW-hr values for all PQM meters.
8) Display calculated values for "Transformer and Line Losses", which subtracts "Load at 480V" from "Load At 12.47 kV" for current, kW, and kW-hr values for all PQM meters.
c. Display the data in a 480V Meter Table that lists measurements from all power quality meters on the plant.
24. Digital bus Starters, RVSS and VFDs equipped with EtherNet IP communications:
a. Communicate and display all values listed in the equipment specifications, indicated on the Drawings, or listed below.
b. Communicate start and stop commands and receive running feedback over the fieldbus network.
c. Provide data entry screen for the cost of electricity in dollars per (kw*hr), which will be used in calculations for display.
d. Monitor the following additional values, and display on the HMI:
1) Motor current, phase A, B, and C.
2) Over current alarm.
3) Under current alarm.
4) Running status.
5) Phase loss.
6) Stall.
7) Number of starts.
8) History of past 5 trips.
e. Calculate, indicate, historize, and trend, the following additional values:
1) Full Load Amps (static value, Engineer will provide). 2) Average Motor Operating Current.
3) Run Time (Hours).
4) Operating Hours (Hours/Year).
5) Average Load Factor (equals Average Motor Current Operating Current/Full Load Amps) - display as a percentage.
6) Annual Energy Use (kW*hr).
7) Annual Operating Cost (dollars).
8) Percent of Site Electric Use (equals Annual Energy Use/Sum of Annual Energy (kW*hr) values for all PQM meters).
Control Strategies
17100-23 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17100 (CONFORMED) f. For Variable Frequency Drives:
1) Speed command.
2) Speed feedback.
g. For RVSS, Variable Frequency Drives, and where otherwise shown or available, monitor the following over the digital bus network:
1) Line voltage.
2) Power.
3) Power factor.
4) Over voltage alarm.
5) Under voltage alarm.
6) Over current alarm.
7) Under current alarm.
8) Indicate, historize, trend, and alarm data as indicated in the ACS I/O Tables on the Drawings.
3.05 REPAIR/RESTORATION (NOT USED)
3.06 RE-INSTALLATION (NOT USED)
3.07 FIELD QUALITY CONTROL (NOT USED)
3.08 ADJUSTING (NOT USED)
3.09 CLEANING (NOT USED)
3.10 DEMONSTRATION AND TRAINING (NOT USED)
3.11 PROTECTION (NOT USED)
3.12 SCHEDULES (NOT USED)
END OF SECTION