Control Systems: Wireless Communications - Radio
17750-3 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17750 (CONFORMED) B. Submittals for the in-field radio path survey:

1. Initial submittal:
a. Submit the following for review and approval, prior to the radio path survey:
1) Credentials of the firm to perform the radio path survey. 2) Testing equipment used.
3) Testing methodology.
4) Software for path study.
5) Project CPM schedule.
6) Submit a description of testing methods.
7) Example data forms to be used during the site testing. 8) Survey dates at the sites that would be suitable for performing the analysis.

2. Radio path survey submittal:
a. For all the sites, prepare an RF path survey report as described below:
1) Provide a topographic overview of the paths analyzed as part of the radio path survey:
a) Include on the overview:
(1) Locations of all airports, large water bodies, tall structures, overhead electrical lines, and airstrips located within 2,000 meters of any proposed radio site.
(2) Provide topographical plan and profile drawings for each path.
(3) Frequency analysis report that includes the usage traffic in the designed frequency band by other commercial and
non-commercial business in the area.
2) Provide RF path survey calculations including the following information:
a) Field-verified coordinates of each site in longitude and latitude. b) Distance between sites (miles), for each communication link. c) Elevation of each site (ft. ASL).
d) Direction of path (degrees from north).
e) Antenna type used.
f) Antenna mounting height.
g) Up tilt/down tilt angles for proposed antenna mountings. h) Received signal
3) Provide recommendations for modifications or adjustments to the design for extending all paths with insufficient fade margin for reliable operation including to but not limited to the following:
a) Proposed repeater sites.
b) Antenna gain improvements.
c) Antenna height mounting adjustments.
d) Antenna/radio quantity, especially for master stations for communicating to all remote sites successfully.
e) Path calculations for the improved radio paths.
4) Provide a summary of findings and recommendations for further work.
b. Upon completion of the radio path survey, submit a final report to the Owner for review a minimum of 30 days before the second coordination meeting as specified in the Submittals article under “Prepare and Submit

Page 2303 of 3040 ends

Control Systems: Wireless Communications - Radio
17750-4 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17750 (CONFORMED) an Agenda for the second Coordination Meetings.” Summarize the radio path survey results and include the following:
1) Field data captured.
2) Recommended antenna and repeater/receiver sites.
3) Recommended antenna heights and types.
4) Recommended sites that serve as communication hubs to collect data.
5) Critical communication paths and loops for adding redundant links. 6) Summary of findings and recommendations.
c. If, upon review of the radio path survey report, the Owner determines that the information is insufficient or incomplete in any way, perform all necessary actions to complete the report.

C. Prepare and submit an agenda for 2 mandatory coordination meetings.

1. First meeting:
a. Summarize their understanding of the Project.
b. Discuss any proposed alternatives.
c. Schedule access to Owner sites.
d. Schedule the remaining coordination meetings.
e. Request any additional information required from the Owner. f. Review the preliminary design, software radio path study report, and plan radio path survey.
g. Select the hardware to be used during the in-field radio path survey, meeting the requirements described in the contract documents. h. Understand the project construction sequence.
i. Understand municipal ordinance and other construction restrictions associated with the sites.
j. Schedule the in-field radio path survey during high-foliage season after coordination with the Owner for all wireless radio communication links.

2. Second meeting:
a. Schedule a meeting after the radio path survey has been completed:
1) To present the findings of the radio path survey to the Owner and Engineer.
b. Discuss the content of the radio path survey report in a line-by-line manner.
c. Outline the recommended and optimal configuration for the Owner’s wireless radio system architecture.
d. Coordinate radio configuration settings with the Owner including, but not limited to, the following:
1) IP addresses.
2) Passwords.
3) Encryption and security settings.
4) Operating Mode.
5) Polling.
e. Discuss any exceptions or deviations from design calculations on antenna heights and site locations.
f. Discuss construction and work progress schedule.
g. Discuss training requirements and schedule.

Page 2304 of 3040 ends

Control Systems: Wireless Communications - Radio
17750-5 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17750 (CONFORMED) D. Delegated design submittals:

1. For outdoor installations:
a. Project-specific calculations with anchoring and bracing details based on support conditions and requirements to resist loads specified in Section 01850 - Design Criteria.

E. Submit product data for all components of the radio communication system:

1. Radio.

2. SIM card(s).

3. Antenna.

4. Cables between radio and antenna.

5. All other related accessories.

6. Certification for outdoor installation.

7. Communication port type and quantity.

8. Installation details for each component indicated above.

9. For each type of radio/antenna:
a. Provide operating mode setup, encryption, and polling configuration information.

10. Block diagram showing the location of each component of the radio communication system.

11. Radio link map associated with each site.

F. Furnish commissioning submittals listed below and specified in this Section as specified in Section 01756 - Commissioning:

1. Manufacturer’s representative qualifications.

Owner training.

1.05 QUALITY ASSURANCE
A. As specified in Section 17050 - Common Work Results for Process Control and Instrumentation Systems.

B. Verify communications between sites as follows:

1. Perform radio path survey to verify the theoretical performance of the software radio path study report.

2. Verify the radio paths using received signal strength and interference measurements obtained in the field and obtain an approval from the Owner and the Engineer prior to procurement installation, testing, and commissioning.

C. After installation, verify using field-collected data that the installed equipment conforms to reliability benchmark developed as part of the field testing.

1.06 DELIVERY, STORAGE, AND HANDLING
A. As specified in Section 17050 - Common Work Results for Process Control and Instrumentation Systems.

1.07 PROJECT OR SITE CONDITIONS
A. As specified in Section 01850 - Design Criteria.

Page 2305 of 3040 ends

Control Systems: Wireless Communications - Radio
17750-6 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17750 (CONFORMED)

1.08 ADMINISTRATIVE REQUIREMENTS
A. Coordination:

1. Coordinate radio configuration and encryption options with the Owner:
a. Adjust configuration and encryption settings as deemed necessary by the Owner.
b. Provide radio configuration record files and save the device configuration on a standard SD card if available.

2. Configure security settings and options as recommended by the radio manufacturer and as deemed necessary by the Owner and Engineer. Provide setup for secure username and password authentication by the Owner. a. Alerts shall be sent to defined list of recipients via pre-configured SMS text message.
b. Alerts shall be sent to defined list of recipients via SMTP (email) message.

B. For licensed radio systems, coordinate and assist the Owner in obtaining and updating all required radio licenses with the FCC.

1.09 WARRANTY
A. As specified in Section 01783 - Warranties and Bonds.

B. Provide a minimum of 1 year of warranty from substantial completion date for all wireless communication equipment.

1.10 MAINTENANCE
A. Furnish all parts, materials and additional components necessary for maintenance and calibration purposes for 1 year:

1. Deliver all supplies before Substantial Completion.

Page 2306 of 3040 ends

Control Systems: Wireless Communications - Radio
17750-7 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17750 (CONFORMED) PART 2 PRODUCTS

2.01 GENERAL
A. Furnish and install an industrial wireless communication system that will serve the following sites:

1. Coordinates are approximate.

Site Name
Site
Coordinates
(Latitude N;
Longitude W)
Antenna Tag
Wireless
Technology/
Operational
Mode
Antenna
Mounting
Height
Notes
Master Site 39 06 50.73;
123 11 29.74
ANT1-99400 900MHz
licensed
35 feet above
ground level
Omni-directional
Water Tank
(Recycled
Water Pump
Station)
39 09 33.89;
123 11 41.76
ANT2-99400 900MHz
licensed
35 feet above
ground level
Yagi
B. The wireless radio communication system shall be provided as indicated on the Drawings, software radio communication path study reports attached in Attachment A, and as described in this Section.

C. The Contract Documents for the components of the wireless communication system are based on software radio path studies.

D. Verify site conditions, perform a detailed radio path survey, and provide a completely functional wireless radio communication system.

2.02 DESIGN AND PERFORMANCE CRITERIA
A. System must be in accordance with the following:

1. Code of Federal Regulations:
a. CFR Title 47:
1) Part 15 - Unlicensed Spread Spectrum.
2) Part 90 - UHF Radio Systems - Subpart C and J.
3) Part 101 - Fixed Microwave Services.
a) Subpart H - Private Operational Fixed Point-to-Point Microwave Service.
b) Subpart O - Multiple Address Systems.

2. NFPA 79, Annex “D” Standards.

3. NEC.

4. NEMA.

5. ISA.

6. IEC.

7. State and Local code requirements.

8. TIA 1019.

Page 2307 of 3040 ends

Control Systems: Wireless Communications - Radio
17750-8 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17750 (CONFORMED) B. Performance requirements for wireless radio communication:

1. The following are the radio path requirements for the radio communication system:
a. Minimum fade margin: 20dB.
b. Less than 25 percent obstruction within the first 60 percent of the Fresnel zone.

2. Minimum antenna mounting heights are described on the following:
a. At a minimum, as specified in software radio path study design report in Attachment A.

2.03 MANUFACTURERS
A. Radio:

1. Licensed radio:
a. One of the following or equal:
1) General Electric, Orbit LN Series.

B. Transmission cables:

1. Manufacturers: One of the following or equal:
a. CommScope:
1) HELIAX Cable Products.
b. Times Microwave Systems.

C. Surge protectors:

1. Manufacturers: One of the following or equal:
a. CommScope:
1) T Series Surge Arrestors.
2) Gas Tube Surge Arrestors.
b. Phoenix Contact, Trabtech Series.

2. As specified in Section 17710 - Control Systems: Panels, Enclosures, and Panel Components.

D. Antennas:

1. Radio antennas:
a. Manufacturers: One of the following or equal:
1) Kathrein Scala.
2) CommScope.

E. Antenna support structure:

1. One of the following or equal:
a. Rohn Products, LLC.
b. Trylon, Inc.

2.04 MANUFACTURED UNITS
A. Licensed radio system:

1. General:
a. The radio system comprises the following:
1) Wireless radio(s).
2) Antennas.
3) Surge protectors.

Page 2308 of 3040 ends

Control Systems: Wireless Communications - Radio
17750-9 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17750 (CONFORMED) 4) Transmission cables.
5) Software and other accessories as specified in the Components article.
6) Protocol conversion modules as indicated on the Drawings.

2. Performance requirements:
a. Frequency: 902-928 MHz.
b. Ambient temperature range: -20 to 60 degrees Celsius. c. Enclosure protection class:
1) IEC IP20.
d. Bi-directional (2-way) system:
1) Transceiver:
a) Carrier power: 0.1 to 5 W, programmable.
b) Transmission mode: Packet.
c) Interface:
(1) Ethernet 10/100 MB RJ-45 port.
d) Duty cycle: Continuous.
e) Power supply: 10-30 VDC.

B. Transmission cables characteristics:

1. 1/2-inch, nominal diameter.

2. Continuous section without splices or connectors other than at the radio and antenna.

3. Rated for outdoor installation.

4. Cable length: As indicated on the Drawings or as indicated in the path study report.

5. Cable characteristics:
a. Attenuation: Less than 5 dB at 960 MHz per 100 feet. b. Characteristic impedance: 50 ohms.
c. Coaxial shield.
d. Dielectric: Foam.

C. Antennas:

1. Radio antenna characteristics:
a. Yagi antenna:
1) Frequency range: 902-928 MHz.
2) Nominal impedance: 50 ohm.
3) Connector: N-Type.
4) Gain: 7 dB or greater.
5) Construction material: All welded aluminum.
6) Operating temperature:
a) Stationary: -40 to 85 degrees Celsius.
b) Cyclic: -40 to 55 degrees Celsius.
b. Omni-directional antenna characteristics:
1) Frequency range: 902-928 MHz.
2) Nominal impedance: 50 ohm.
3) Connection: N-type.
4) Gain: 10 dB or greater.
5) Construction material: All welded aluminum.
6) Operating temperature: -40 to 75 degrees Celsius.

Page 2309 of 3040 ends

Control Systems: Wireless Communications - Radio
17750-10 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17750 (CONFORMED)

3. Antenna support structures:
a. Antenna mast:
1) Mast shall be 2 inch schedule 80 steel pole. Furnish mast as one continuous length for full height without splices.
2) Each mast shall be grounded with dedicated ground rod and grounding conductors.
3) Provide required accessories for complete installation of antenna. 4) See Electrical drawings for details.

2.05 MATERIALS (NOT USED)

2.06 ACCESSORIES
A. Antenna accessories:

1. Provide all required mounting accessories required for installation, such as clamps, brackets adapters, and related hardware for a complete installation. a. Mounting guidelines shall be provided in the installation details indicated on the Drawings and as recommended by the manufacturer.

2. Provide mounting hardware to meet the wind and seismic requirements at the Project Site as specified in Section 01850 - Design Criteria.

B. Provide lightning surge arrestors and data line surge protection for radios or antennas located outdoors.

C. Provide antenna cables, connectors, and related hardware for a complete installation.

D. Provide din-rail mounting adapters required for installation of radios in control panels/communication cabinets, as needed for each application.

E. Software:

1. Provide software package for radio diagnostic testing.

2. Provide radio configuration via a secured wireless or wired ethernet network.

PART 3 EXECUTION

3.01 EXAMINATION (NOT USED)

3.02 PREPARATION
A. Anchoring and bracing to structures:

1. Prepare equipment anchor setting template(s) and use to position anchors during construction of supporting structure(s).

2. Install anchors of type and material indicated on approved anchoring designs.

3. Install anchors with embedment indicated on approved anchoring designs.

Page 2310 of 3040 ends

Control Systems: Wireless Communications - Radio
17750-11 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17750 (CONFORMED)

3.03 INSTALLATION
A. As specified in Section 17050 - Common Work Results for Process Control and Instrumentation Systems.

B. Tag and label terminal blocks, radio system components and associated wiring as indicated in the Drawings and as specified in Section 16075 - Identification for Electrical Systems.

3.04 COMMISSIONING
A. As specified in Section 01756 - Commissioning and Section 17950 - Commissioning for Instrumentation and Controls for communications testing requirements.

B. Functional Testing:

1. Hardware and communication testing:
a. Perform tests to show that the integrated system hardware and software is fully operational and in compliance with the requirements specified in the Contract Documents.
b. Engineer approval of the FAT Communication Testing activities is required before proceeding to FAT Platform Testing.

2. Failure testing: Demonstrate how the system responds to and recovers from abnormal conditions including, but not limited to:
a. Equipment failure.
b. Operator error.
c. Communications subsystem error.
d. Communications failure.
e. Simulated/forced software lockups.
f. Power failure (both utility power and power to HMI and/or SCADA hardware).
g. High system loading conditions.

C. Owner Training:

1. Perform Owner training as specified in Section 01756 - Commissioning.

2. Radio communication initial training: Provide 1 - hour training session for up to 2 individuals from the Owner on the following:
a. Radio communication system hardware, setup, basic working principle of the installed system and basic troubleshooting and diagnostics.

3. Radio communication follow-up training: Provide 1 - hour training session for up to 2 individuals from the Owner on the following:
a. Radio communication system configuration, encryption, advanced troubleshooting, and diagnostics.

3.05 FIELD QUALITY CONTROL
A. Verify using field-collected data that the installed equipment conforms to reliability benchmarks developed as part of the field testing.

Page 2311 of 3040 ends

Control Systems: Wireless Communications - Radio
17750-12 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17750 (CONFORMED) B. Submit a report to document field-verified transmit and receive signal strength and any RF interference after installation of final communication elements.

1. Troubleshoot issues and assist Owner with FCC coordination if interference is detected during startup and commissioning.

C. The installation shall follow the wireless network manufacturer’s recommended installation practices and comply with all applicable codes.

D. Upon completion of installation, provide the services of a factory-certified local service technician to perform start-up testing. Record test results and compare to factory testing to confirm proper operation of equipment. Submit test results with operation and maintenance manuals.

3.06 ADJUSTING
A. Orient directional antennas as required for maximum receive strength signal intensity during startup.

END OF SECTION

Page 2312 of 3040 ends

Control Systems: Wireless Communications - Radio
17750-Attachment A 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17750 (CONFORMED)

ATTACHMENT A - PATH STUDY REPORT

Page 2313 of 3040 ends
Page 2314 of 3040 ends

Ukiah July 12, 2023 - CONFORMED
17750-Attachment A, Path Study Report
17750 Attachment A-1 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17750 Attachment (CONFORMED) City of Ukiah
Recycled Water Project - Phase 4
Radio Communications Path Study
Attachment A to Specification 17750, Control Systems: Wireless Communications - Radio Water Tank
598.7 ft
39 09 33.89 N
123 11 41.76 W
Master Site

Page 2315 of 3040 ends

Ukiah July 12, 2023 - CONFORMED
17750-Attachment A, Path Study Report
17750 Attachment A-2 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17750 Attachment (CONFORMED) Master Site
Latitude 39 06 50.73 N
Longitude 123 11 29.74 W
Azimuth 356.72°
Elevation 582 ft ASL
Antenna CL 35.0 ft AGL
Water Tank
Latitude 39 09 33.89 N
Longitude 123 11 41.76 W
Azimuth 176.72°
Elevation 599 ft ASL
Antenna CL 35.0 ft AGL
Frequency (MHz) = 928.0
K = 1.33
%F1 = 60.00
Path length (3.13 mi)
0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 2.0 2.2 2.4 2.6 2.8 3.0 Elevation (ft)
560
570
580
590
600
610
620
630
640

Page 2316 of 3040 ends

Ukiah July 12, 2023 - CONFORMED
17750-Attachment A, Path Study Report
17750 Attachment A-3 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17750 Attachment (CONFORMED) Transmission details (Master Site-Water Tank.pl5)
Master Site Water Tank
Latitude 39 06 50.73 N 39 09 33.89 N
Longitude 123 11 29.74 W 123 11 41.76 W
True azimuth (°) 356.72 176.72
Vertical angle (°) 0.04 -0.08
Elevation (ft) 581.89 598.73
Antenna model OMNI (TR) YAGI (TR)
Antenna gain (dBd) 6.85 7.85
Antenna height (ft) 35.00 35.00
TX line model EFX2-50 EFX2-50
TX line unit loss (dB/100 ft) 2.40 2.40
TX line length (ft) 67.80 67.97
TX line loss (dB) 1.63 1.63
Connector loss (dB) 0.10 0.10
Frequency (MHz) 928.00
Polarization Vertical
Path length (mi) 3.13
Free space loss (dB) 105.87
Atmospheric absorption loss (dB) 0.02
Field margin (dB) 5.00
Diffraction loss 3.63
Net path loss (dB) 98.98 98.98
Radio model LN9-25KHz LN9-25KHz
Radio file name ln9_25khz ln9_25khz
TX power (dBm) 28.75 27.40
EIRP (dBm) 36.02 35.67
RX threshold criteria 10-6 BER 10-6 BER
RX threshold level (dBm) -114.00 -114.00
RX threshold level (µv) 0.45 0.45
Receive signal (dBm) -71.58 -70.23
Receive signal (µv) 58.98 68.88
Receive field strength (µv/m) 802.77 687.46
Thermal fade margin (dB) 42.42 43.77

Page 2317 of 3040 ends

Ukiah July 12, 2023 - CONFORMED
17750-Attachment A, Path Study Report
17750 Attachment A-4 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17750 Attachment (CONFORMED) Master Site Water Tank
Annual location availability (%) 100.00000 100.00000
Annual location unavailability (min) 0.00 0.00
Annual multipath availability (%) 99.99428 99.99580
Annual multipath unavailability (min) 30.07 22.05

Page 2318 of 3040 ends

Ukiah July 12, 2023 - CONFORMED
17750-Attachment A, Path Study Report
17750 Attachment A-5 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17750 Attachment (CONFORMED) Transmission summary (Master Site-Water Tank.pl5)
F = 928.00 MHz K = 1.33 %F1 = 60.0, 60.0
Master Site Water Tank
Latitude 39 06 50.73 N 39 09 33.89 N
Longitude 123 11 29.74 W 123 11 41.76 W
True azimuth (°) 356.72 176.72
Vertical angle (°) 0.04 -0.08
Elevation (ft) 581.89 598.73
Antenna model OMNI (TR) YAGI (TR)
Antenna gain (dBd) 6.85 7.85
Antenna height (ft) 35.00 35.00
TX line model EFX2-50 EFX2-50
TX line length (ft) 67.80 67.97
TX loss (dB) 1.73 1.73
RX loss (dB) 1.73 1.73
Diffraction loss 3.63
Radio model LN9-25KHz LN9-25KHz
TX power (dBm) 28.75 27.40
EIRP (dBm) 36.02 35.67
Path length (3.13 mi)
0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 2.0 2.2 2.4 2.6 2.8 3.0 Elevation (ft)
560
570
580
590
600
610
620
630
640

Page 2319 of 3040 ends

Ukiah July 12, 2023 - CONFORMED
17750-Attachment A, Path Study Report
17750 Attachment A-6 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17750 Attachment (CONFORMED) Master Site Water Tank
Receive signal (dBm) -71.58 -70.23
Receive signal (µv) 58.98 68.88
Thermal fade margin (dB) 42.42 43.77
Annual location availability (%) 100.00000 100.00000
Annual multipath availability (%) 99.99428 99.99580

Page 2320 of 3040 ends

Ukiah July 12, 2023 - CONFORMED
17750-Attachment A, Path Study Report
17750 Attachment A-7 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17750 Attachment (CONFORMED) Diffraction report (Master Site-Water Tank.pl5)
Diffraction algorithm Pathloss
Multiple knife edge method Deygout
Maximum number of obstacles 2
Obstacle radius method Major obstacle only
Foreground loss method Scaled height-gain
Master Site Water Tank
Elevation (ft) 581.89 598.73
Antenna height (ft) 35.00 35.00
Effective antenna height (ft) 35.00 46.43
Distance (mi) 3.13
Frequency (MHz) 928.00
Earth radius factor K 1.33
Polarization Vertical
Tree type Dry bare trees
Ground type Average
1 - Near single knife edge
Location (mi) 1.30
Left side (mi) 0.00
Right side (mi) 3.13
Clearance (ft) 0.00
Clearance /F1 (%) 53.96
V -0.76
Radius (mi) 0.41
Loss (dB) 0.52
2 - Near single knife edge
Location (mi) 1.46
Left side (mi) 0.00
Right side (mi) 3.13
Clearance (ft) 0.00
Clearance /F1 (%) 56.20
V -0.79
Radius (mi) 1.09
Loss (dB) 0.47
3 - Near single knife edge
Location (mi) 1.57
Left side (mi) 0.00
Right side (mi) 3.13
Clearance (ft) 0.00
Clearance /F1 (%) 48.09
V -0.68
Radius (mi) 4.78
Loss (dB) 0.85
4 - Near single knife edge
Location (mi) 2.39
Left side (mi) 0.00
Right side (mi) 3.13
Clearance (ft) 0.00
Clearance /F1 (%) 50.84

Page 2321 of 3040 ends

Ukiah July 12, 2023 - CONFORMED
17750-Attachment A, Path Study Report
17750 Attachment A-8 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17750 Attachment (CONFORMED) V -0.72
Radius (mi) 36.03
Loss (dB) 1.79
Diffraction loss 3.63
Tree - building loss (dB) 0.00
Free space loss (dB) 105.87
Atmospheric absorption loss (dB) 0.02
Total loss (dB) 109.52

Page 2322 of 3040 ends

Schedules: Field Instruments
17901-1 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17901 (CONFORMED) SECTION 17901
SCHEDULES: FIELD INSTRUMENTS
PART 1 GENERAL

1.01 SUMMARY
A. The Schedules Field Instrument is not a take-off list. Refer to Drawings and Specifications for additional information. Where any discrepancies between this list and the P&ID drawings arise, the P&ID shall govern.

B. Abbreviations used in the Instrument Index are defined on the Drawings.

PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION

3.01 SCHEDULES FIELD INSTRUMENTS
A. Schedules Field Instruments attached.

END OF SECTION

Page 2323 of 3040 ends
Page 2324 of 3040 ends

Schedules: Field Instruments
17901-Attachment A 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17901 (CONFORMED) ATTACHMENT A - SCHEDULES: FIELD INSTRUMENTS

Page 2325 of 3040 ends
Page 2326 of 3040 ends

Field Instruments
Specification: 17201
Tag Type Range or Setpoint Description Drawing
LSHH-89100 17.5 FT HIGH HIGH AND LOW LOW LEVEL SWITCHES 89N01 LSLL-89100 2 FT HIGH HIGH AND LOW LOW LEVEL SWITCHES 89N01 LSL-91101 2 FT HIGH HIGH AND LOW LEVEL SWITCHES 91N01
LSHH-91101 7 FT HIGH HIGH AND LOW LEVEL SWITCHES 91N01
LSLL-99403 1 FT LEVEL FLOAT SWITCHES 99N01
LSHH-99403 25 FT LEVEL FLOAT SWITCHES 99N01
Specification: 17206
Tag Type Range or Setpoint Description Drawing
LIT-80100 ULTRASONIC 0-18 FT STRUCT 80 LEVEL 80N01
FIT-88101 ULTRASONIC 600-1500 GPM CHLORINE CONTACT BASIN OPEN CHANNEL FLOW METER 1 88N01 FIT-88102 ULTRASONIC 600-1500 GPM CHLORINE CONTACT BASIN OPEN CHANNEL FLOW METER 2 88N01 Specification: 17208
Tag Type Range or Setpoint Description Drawing
LIT-89103 RADAR PTOF 0-19.5 FT CAROUSEL LEVEL TRANSMITTER 89N01 Specification: 17301
Tag Type Range or Setpoint Description Drawing
FSL-89100 THERMAL 400 GPM LOW FLOW SWITCH 89N01
FSL-89101 THERMAL 400 GPM LOW FLOW SWITCH 89N01
FSL-89102 THERMAL 2000 GPM LOW FLOW SWITCH 89N01
FSL-91100 THERMAL 875 GPM LOW FLOW SWITCH 91N01
FSL-99411 THERMAL 450 GPM THERMAL LOW FLOW SWITCH 99N01 FSL-99412 THERMAL 450 GPM THERMAL FLOW SWITCH 99N02
FSL-99413 THERMAL 450 GPM THERMAL FLOW SWITCH 99N02
FSL-99414 THERMAL 450 GPM THERMAL FLOW SWITCH 99N02
Specification: 17302
Tag Type Range or Setpoint Description Drawing
FIT-99406 MAGNETIC 500-4000 GPM FLOW METER 99N01
FIT-99431 MAGNETIC 400-4000 GPM FLOW METER 99N03
4/4/2023

Page 1 of 2 ends

CAROLLO - Field Instrument List
8660F10
17901 Attachment A-1 8660F10 July 12, 2023 - CONFORMED

Page 2327 of 3040 ends

Field Instruments
Specification: 17316
Tag Type Range or Setpoint Description Drawing
FI-60101 CHLORINE 0-500 ML/MIN CHLORINE SAMPLE FLOW INDICATOR 60N01 FI-87130 CHLORINE 0-500 ML/MIN CHLORINE SAMPLE FLOW INDICATOR 87N01 Specification: 17404
Tag Type Range or Setpoint Description Drawing
PI-60101 PRESSURE 0-30 PSI PRESSURE INDICATOR 60N01
PI-87130 PRESSURE 0-30 PSI PRESSURE INDICATOR 87N01
PI-99411 PRESSURE 0-150 PSIG PRESSURE INDICATOR 99N01
PI-99412 PRESSURE 0-150 PSI PRESSURE INDICATOR 99N02
PI-99413 PRESSURE 0-150 PSI PRESSURE INDICATOR 99N02
PI-99414 PRESSURE 0-150 PSI PRESSURE INDICATOR 99N02
PI-99432 PRESSURE 0-300 PSI PRESSURE INDICATOR 99N03
Specification: 17405
Tag Type Range or Setpoint Description Drawing
PIT-99432 PRESSURE 0-300 PSIG PRESSURE TRANSMITTER 99N03 Specification: 17407
Tag Type Range or Setpoint Description Drawing
LIT-99405 P-SUB 0-25 FT LEVEL TRANSMITTER 99N01
Specification: 17505
Tag Type Range or Setpoint Description Drawing
AIT-60101 CHLORINE 0-10 MG/L CHLORINE ANALYZER 4 60N01
AIT-87130 CL 0-10 MG/L CHLORINE ANALYZER 3 87N01
4/4/2023

Page 2 of 2 ends

CAROLLO - Field Instrument List
8660F10
17901 Attachment A-2 8660F10 July 12, 2023 - CONFORMED

Page 2328 of 3040 ends

Schedules: I/O List
17903-1 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17903 (CONFORMED) SECTION 17903
SCHEDULES: I/O LIST
PART 1 GENERAL

1.01 SUMMARY
A. The I/O list is not a take-off list. Additional information is as indicated on the Drawings and specified in the Contract Documents. Where any discrepancies between this list and the P&ID drawings arise, the P&ID shall govern.

B. Abbreviations used in the I/O list are indicated on the Drawings.

PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION

3.01 I/O LIST
A. As specified in Attachment A - I/O list.

END OF SECTION

Page 2329 of 3040 ends
Page 2330 of 3040 ends

Schedules: I/O List
17903-Attachment A 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17903 (CONFORMED) ATTACHMENT A – I/O LIST

Page 2331 of 3040 ends
Page 2332 of 3040 ends

PLC I/O Listing for PLC-4
Drawing Tag I/O Location Description Service (E/F)
85N05 F-85105 AI PLC-4 AIR WASH VENTURI FLOWMETER E
85N06 L-85180 AI PLC-4 TNK 2 LEVEL E
87N01 A-87130 AI PLC-4 CL CHLORINE ANALYZER 3
88N01 F-88101 AI PLC-4 CHLORINE CONTACT BASIN OPEN CHANNEL FLOW METER 1 88N01 F-88102 AI PLC-4 CHLORINE CONTACT BASIN OPEN CHANNEL FLOW METER 2 PLC-4 Total AI Points = 5
85N06 SS-85181 AO PLC-4 SPEED OUT COAGULANT FEED PUMP NO. 1 E 85N06 SS-85182 AO PLC-4 SPEED OUT COAGULANT FEED PUMP NO. 2 E 85N06 SS-85183 AO PLC-4 SPEED OUT COAGULANT FEED PUMP NO. 3 E PLC-4 Total AO Points = 3
4/4/2023

Page 1 of 4 ends

CAROLLO - I/O List
8660F10
17903 Attachment A-1 8660F10 July 12, 2023 - CONFORMED

Page 2333 of 3040 ends

PLC I/O Listing for PLC-4
Drawing Tag I/O Location Description Service (E/F)
85N06 AUX1-85181 DI PLC-4 RUNNING COAGULANT FEED PUMP NO. 1 E 85N06 AUX1-85182 DI PLC-4 RUNNING COAGULANT FEED PUMP NO. 2 E 85N06 AUX1-85183 DI PLC-4 RUNNING COAGULANT FEED PUMP NO. 3 E 85N06 AUX2-85181 DI PLC-4 E-STOP COAGULANT FEED PUMP NO. 1 E 85N06 AUX2-85182 DI PLC-4 E-STOP COAGULANT FEED PUMP NO. 2 E 85N06 AUX2-85183 DI PLC-4 E-STOP COAGULANT FEED PUMP NO. 3 E 85N07 AUX1-85104 DI PLC-4 RUNNING RAPID MIX PUMP
85N07 HSAR-85104 DI PLC-4 REMOTE RAPID MIX PUMP
85N07 TSH-85104 DI PLC-4 HIGH TEMP RAPID MIX PUMP
87N01 AUX1-87132 DI PLC-4 READY BACKWASH PUMP NO. 1 E
87N01 AUX1-87133 DI PLC-4 READY BACKWASH PUMP 2 E
87N01 AUX1-87134 DI PLC-4 RUNNING BACKWASH CHLORINE SAMPLE PUMP 87N01 AUX2-87132 DI PLC-4 FAILED BACKWASH PUMP NO. 1 E
87N01 AUX2-87133 DI PLC-4 FAILED BACKWASH PUMP 2 E
87N01 HSAR-87134 DI PLC-4 REMOTE BACKWASH CHLORINE SAMPLE PUMP 87N01 LSH-87130 DI PLC-4 HIGH LEVEL SWITCH E
87N01 LSL-87130 DI PLC-4 LOW LEVEL SWITCH E
87N01 TSH-87134 DI PLC-4 HIGH TEMP BACKWASH CHLORINE SAMPLE PUMP PLC-4 Total DI Points = 18
85N07 MS-85104 DO PLC-4 RUN RAPID MIX PUMP
87N01 MS-87132 DO PLC-4 RUN BACKWASH PUMP NO. 1 E
87N01 MS-87133 DO PLC-4 RUN BACKWASH PUMP 2 E
87N01 MS-87134 DO PLC-4 RUN BACKWASH CHLORINE SAMPLE PUMP PLC-4 Total DO Points = 4
4/4/2023

Page 2 of 4 ends

CAROLLO - I/O List
8660F10
17903 Attachment A-2 8660F10 July 12, 2023 - CONFORMED

Page 2334 of 3040 ends

PLC I/O Listing for PLC-70299
Drawing Tag I/O Location Description Service (E/F)
60N01 A-60101 AI PLC-70299 CL CHLORINE ANALYZER 4 E
80N01 L-80100 AI PLC-70299 STRUCT 80 LEVEL
89N01 L-89103 AI PLC-70299 CAROUSEL LEVEL TRANSMITTER
PLC-70299 Total AI Points = 3
60N01 HSAR-60009 DI PLC-70299 REMOTE DCL STRUCT CHLORINE VALVE E 60N01 ZSC-60009 DI PLC-70299 CLOSED DCL STRUCT CHLORINE VALVE E 60N01 ZSO-60009 DI PLC-70299 OPENED DCL STRUCT CHLORINE VALVE E 89N01 LSHH-89100 DI PLC-70299 HIGH HIGH AND LOW LOW LEVEL SWITCHES 89N01 LSLL-89100 DI PLC-70299 HIGH HIGH AND LOW LOW LEVEL SWITCHES PLC-70299 Total DI Points = 5
60N01 ZCC-60009 DO PLC-70299 CLOSE DCL STRUCT CHLORINE VALVE E 60N01 ZCO-60009 DO PLC-70299 OPEN DCL STRUCT CHLORINE VALVE E PLC-70299 Total DO Points = 2
4/4/2023

Page 3 of 4 ends

CAROLLO - I/O List
8660F10
17903 Attachment A-3 8660F10 July 12, 2023 - CONFORMED

Page 2335 of 3040 ends

PLC I/O Listing for PLC-99400
Drawing Tag I/O Location Description Service (E/F)
99N01 F-99406 AI PLC-99400 FLOW METER
99N01 L-99405 AI PLC-99400 LEVEL TRANSMITTER
99N03 F-99431 AI PLC-99400 FLOW METER
99N03 P-99432 AI PLC-99400 PRESSURE TRANSMITTER
PLC-99400 Total AI Points = 4
99N01 LSHH-99403 DI PLC-99400 LEVEL FLOAT SWITCHES
99N01 LSLL-99403 DI PLC-99400 LEVEL FLOAT SWITCHES
99N01 ZSC-99402 DI PLC-99400 CLOSED TANK FILL VALVE
99N01 ZSO-99402 DI PLC-99400 OPENED TANK FILL VALVE
99N04 JS1-99400 DI PLC-99400 PWR SUP OK PCM CABINET
99N04 JS2-99400 DI PLC-99400 PWR SUP OK PCM CABINET
99N04 JS3-99400 DI PLC-99400 REDUNDANCY OK PCM CABINET
99N04 JS4-99400 DI PLC-99400 ACB OK PCM CABINET
99N04 TSH-99400 DI PLC-99400 PLC TEMP PCM CABINET
99N04 XA4-99400 DI PLC-99400 SPD2 FAIL PCM SURGE PROTECTOR 99N04 XA5-99400 DI PLC-99400 ES-P FAIL
99N04 XA6-99400 DI PLC-99400 SPD FAIL PCM SURGE PROTECTOR 99N04 XA7-99400 DI PLC-99400 ECP-P FAIL
99N04 ZS1-99400 DI PLC-99400 INTRUSION PCM CABINET
PLC-99400 Total DI Points = 14
99N01 ZCC1-99402 DO PLC-99400 CLOSE TANK FILL VALVE
99N01 ZCC2-99402 DO PLC-99400 CLOSE TANK FILL VALVE
99N01 ZCO1-99402 DO PLC-99400 OPEN TANK FILL VALVE
99N01 ZCO2-99402 DO PLC-99400 OPEN TANK FILL VALVE
PLC-99400 Total DO Points = 4
4/4/2023

Page 4 of 4 ends

CAROLLO - I/O List
8660F10
17903 Attachment A-4 8660F10 July 12, 2023 - CONFORMED

Page 2336 of 3040 ends

Commissioning for Instrumentation and Controls
17950-1 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17950 (CONFORMED) SECTION 17950

COMMISSIONING FOR INSTRUMENTATION AND CONTROLS

TABLE OF CONTENTS
PART 1 GENERAL.................................................................................................................2

1.01 SUMMARY ...................................................................................................................2

1.02 REFERENCES.............................................................................................................2

1.03 DEFINITIONS...............................................................................................................2

1.04 SYSTEM DESCRIPTION (NOT USED) .......................................................................2

1.05 SUBMITTALS...............................................................................................................2

1.06 QUALITY ASSURANCE...............................................................................................4

1.07 DELIVERY, STORAGE, AND HANDLING (NOT USED).............................................4

1.08 PROJECT OR SITE CONDITIONS (NOT USED)........................................................4

1.09 SEQUENCING (NOT USED) .......................................................................................4

1.10 SCHEDULING (NOT USED)........................................................................................4

1.11 WARRANTY (NOT USED)...........................................................................................4

1.12 SYSTEM START-UP (NOT USED)..............................................................................4

1.13 OWNER’S INSTRUCTIONS (NOT USED)...................................................................4

1.14 MAINTENANCE (NOT USED) .....................................................................................4 PART 2 PRODUCTS (NOT USED) ........................................................................................4 PART 3 EXECUTION .............................................................................................................4

3.01 EXAMINATION (NOT USED).......................................................................................4

3.02 PREPARATION (NOT USED)......................................................................................4

3.03 INSTALLATION............................................................................................................5

3.04 ERECTION, INSTALLATION, APPLICATION, CONSTRUCTION (NOT USED).........5

3.05 REPAIR/RESTORATION (NOT USED) .......................................................................5

3.06 COMMISSIONING........................................................................................................5

3.07 FIELD QUALITY CONTROL (NOT USED) ................................................................26

3.08 RE-INSTALLATION (NOT USED)..............................................................................26

3.09 ADJUSTING (NOT USED) .........................................................................................26

3.10 CLEANING (NOT USED) ...........................................................................................27

3.11 PROTECTION (NOT USED)......................................................................................27

3.12 SCHEDULES..............................................................................................................27

ATTACHMENT A - FACTORY ACCEPTANCE TEST - CONTROL PANELS

ATTACHMENT B - INSTALLATION AND CERTIFICATION CHECKLIST DOCUMENTATION

ATTACHMENT C - SWITCHES INSTALLATION AND CALIBRATION CHECKLIST

ATTACHMENT D - TRANSMITTER/CONTROLLER/INDICATOR INSTALLATION AND

CALIBRATION CHECKLIST

ATTACHMENT E - ANALYZERS INSTALLATION AND CALIBRATION CHECKLIST

ATTACHMENT F - CONTROL VALVES INSTALLATION AND CALIBRATION CHECKLIST

Page 2337 of 3040 ends

Commissioning for Instrumentation and Controls
17950-2 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17950 (CONFORMED) PART 1 GENERAL

1.01 SUMMARY
A. Section includes:

1. Testing requirements that apply to process control and instrumentation systems for the entire Project.

1.02 REFERENCES
A. As specified in Section 17050 - Common Work Results for Process Control and Instrumentation Systems.

B. Electronics Industries Alliance (EIA).

C. Telecommunications Industry Association (TIA).

1.03 DEFINITIONS
A. As specified in Sections 01756 - Commissioning and 17050 - Common Work Results for Process Control and Instrumentation Systems.

B. Specific definitions:

1. Complete End-to-End Testing (CEET) - Signals are tested from the field device through the PLC program, the network, and all the way to the operator’s HMI graphic screens.

2. Loop Validation Tests - Signals are tested from the field device to the PLC.

3. Platform Testing: Testing of the PLC and SCADA/HMI at the manufacturer’s shop to demonstrate the program’s functionality based upon specified and designed control requirements.

4. PTO: Profibus Trade Organization.

5. Permanent Link: The fixed portion of cabling installed between an equipment outlet and its immediate distributor or between 2 distributors.

1.04 SYSTEM DESCRIPTION (NOT USED)

1.05 SUBMITTALS
A. Furnish submittals as specified in Section 01330 - Submittal Procedures.

B. General:

1. Reference additional detailed test submittal scheduling and prerequisite requirements as specified in the Sequencing article of Section 17050 - Common Work Results for Process Control and Instrumentation Systems.

C. Overall test plan:

1. Develop the PCIS system test submittals in consultation and cooperation with all applicable subcontractors.

2. Develop and submit an overall testing plan for the PCIS. The overall test plan to be reviewed and approved by the Engineer before detailed test plans, procedures, and forms will be reviewed.

Page 2338 of 3040 ends

Commissioning for Instrumentation and Controls
17950-3 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17950 (CONFORMED)

3. Describe the test phases as they apply specifically to this Project and each process system.

4. Provide a preliminary testing schedule to show the sequence of tests and commissioning as they apply to each process system and each PLC.

5. Provide a description of factory tests. Describe what equipment will be included, what testing equipment will be used, and the simulator that will be used.

6. Provide examples of proposed forms and checklists.

D. Test procedures:

1. Develop and submit detailed test procedures to show that the integrated SCADA system hardware and software is fully operational and in compliance with the requirements specified in the Contract Documents.

2. Provide a statement of test objectives for each test.

3. Prepare specific procedures for each process system.

4. Describe sequentially the steps to be followed in verifying the correct operation of each process system, including all features described in the loop descriptions, control strategies, and shown in the P&IDs. Implied or generic test procedures are not acceptable.

5. Specify who will perform the tests, specifically what testing equipment will be used (including serial numbers and NIST-traceable calibration), and how the testing equipment will be used.

6. Describe the expected role of the Engineer, as well as any requirements for assistance from Owner’s staff.

7. Provide the forms and checklists to be used.

E. Test forms:

1. Submit completed calibration forms, test forms, and checklists. a. Test forms shall include the detailed test procedures or shall include clear references to separate pages containing the complete test procedure applicable to each form. If references to procedures are used, the complete procedure shall be included with each test binder. b. Every page of each test form shall include project name, date, time, name of person conducting the test, signature of person conducting the test, and for witnessed tests, place for signature of person (Engineer and Owner) witnessing the test.
c. Sample test forms at the end of this Section show the minimum required content.
1) The sample test forms have not been customized for this Project. 2) Contractor shall develop and submit test forms customized for the Project and meeting the specified test and submittal requirements.

F. FAT procedure additional minimal requirements:

1. Prepare and submit a FAT procedure which includes:
a. Control system testing block diagram.
b. Estimated test duration.

G. Details on the simulator construction, components, and operation. Testing binders:

1. Sub-system to be tested, provide and submit a test binder containing all test procedures and individual test forms for the test. References to other documents for test procedures and requirements are not acceptable.

Page 2339 of 3040 ends

Commissioning for Instrumentation and Controls
17950-4 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17950 (CONFORMED)

2. Fill out in advance headings and all other information known before the test.

3. Include applicable test plan information, as well as a list of all test prerequisites, test personnel, and equipment.

4. Include or list reference material and provide separately at the time of the test.

5. Record test results and verify that all test requirements and conditions have been met.

H. Test reports:

1. At the conclusion of each test, submit a complete test report, including all test results and certifications.

2. Include all completed test binders, forms, and checklists.

3. Submission, review, and acceptance of each test report is required before the start of the sub-system.

1.06 QUALITY ASSURANCE
A. Test personnel:

1. Furnish qualified technical personnel to perform all calibration, testing, and verification. The test personnel are required to be familiar with this Project and the equipment, software, and systems before being assigned to the test program.

1.07 DELIVERY, STORAGE, AND HANDLING (NOT USED)

1.08 PROJECT OR SITE CONDITIONS (NOT USED)

1.09 SEQUENCING (NOT USED)

1.10 SCHEDULING (NOT USED)

1.11 WARRANTY (NOT USED)

1.12 SYSTEM START-UP (NOT USED)

1.13 OWNER’S INSTRUCTIONS (NOT USED)

1.14 MAINTENANCE (NOT USED)
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION

3.01 EXAMINATION (NOT USED)

3.02 PREPARATION (NOT USED)

Page 2340 of 3040 ends

Commissioning for Instrumentation and Controls
17950-5 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17950 (CONFORMED)

3.03 INSTALLATION
A. As specified in Section 17050 - Common Work Results for Process Control and Instrumentation Systems.

B. Installation supervision:

1. Provide as specified in Section 17050 - Common Work Results for Process Control and Instrumentation Systems.

3.04 ERECTION, INSTALLATION, APPLICATION, CONSTRUCTION (NOT USED)

3.05 REPAIR/RESTORATION (NOT USED)

3.06 COMMISSIONING
A. Commissioning as specified in Section 01756 - Commissioning.

B. Testing and training phase:

1. Source testing:
a. Manufacturer services: Provide as specified in the table below.

Section Number Section Title
Source Testing
(Witnessed or
Non-Witnessed)
17100 - Control
Strategies
Control Strategies Witnessed
17101 - Specific
Control Strategies
Specific Control Strategies Witnessed
17710 - Control
Systems - Panels,
Enclosures, and
Panel Components.

Control Systems - Panels, Enclosures,
and Panel Components
Witnessed
17950 -
Commissioning for
Instrumentation and
Controls
Commissioning for Instrumentation and
Controls
Witnessed
b. Prerequisite requirements:
1) Engineer approval of the hardware and equipment source testing submittal, Manufacturer Certificate of Source Testing, is required before proceeding to Preliminary FAT.
c. Preliminary FAT (Pre-FAT):
1) The purpose of the Pre-FAT is to provide assurance that the HMI/SCADA system is ready for the full, witnessed FAT, in terms of both stability and functionality.
a) Debugging of software and troubleshooting of hardware shall occur during and before the pre-FAT, not during the FAT. b) Contractor shall fully test the HMI/SCADA system and fix all deficiencies found before the FAT.

Page 2341 of 3040 ends

Commissioning for Instrumentation and Controls
17950-6 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17950 (CONFORMED) 2) Conduct utilizing test procedures approved by Engineer. 3) Owner shall have the right to witness any or all of the Pre-FAT testing and shall be notified in writing 20 days before the start of the pre-FAT.
4) Submit a letter, signed by the Contractor’s project manager or company officer, certifying that integrated system hardware and software has been tested and confirmed to be fully operational and in compliance with the requirements specified in the Contract Documents and is fully ready for the full, witnessed FAT. a) Attach the completed pre-FAT test forms, signed by the Contractor’s staff.
5) Engineer approval of the pre-FAT submittal is required before proceeding to FAT.
d. FAT hardware and communications testing:
1) Perform tests to show that the integrated system hardware and software is fully operational and in compliance with the requirements specified in the Contract Documents.
2) The complete PCIS system including operator stations, servers, network equipment, printers, PCMs, PLCs, RTUs, LCPs, CCS, peripherals, communications equipment, and other HMI/SCADA equipment, shall be assembled, connected, and software loaded for a fully functional FAT of the integrated system.
3) For any fault tolerant networks such as ring topology networks, disconnect each segment of the network individually to demonstrate proper failover and alarming at the HMI.
4) Testing simulation:
a) Inputs and outputs shall be simulated and proper control and system operation shall be validated.
b) Whenever supplied equipment is available, such as devices internal to the control panel, test input and output signals using the equipment. Simulation is not acceptable.
c) FAT shall make use of simulators that contain switches, pilot lights, variable analog signal generators, and analog signal level displays, which shall be connected to the I/O points within the HMI/SCADA system.
(1) The use of jumper wires, terminal block mounted pilot lights, and loose meters to act as or supply the functionality of a simulator shall not be allowed.
(2) The simulator may consist of a PLC, operating under a HMI/SCADA software package, or other approved software
that has its I/O points wired to PLC’s I/O points.
(3) Software operating on a PC may then act as the switches, pilot lights, variable analog signal generators, and analog signal level displays.
5) Additional source tests are specified in other sections of the Instrumentation and Control Specifications.
6) Owner shall have the right to witness any or all of the FAT testing and shall be notified in writing 20 days before the start of the FAT.

Page 2342 of 3040 ends

Commissioning for Instrumentation and Controls
17950-7 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17950 (CONFORMED) 7) Verify communications between the hardware and the programmer's software comply with specified requirements.
a) For systems that contain RTUs or remote communications with other devices, the complete communications system must be factory tested, including actual interfacing with telephone company equipment and/or the actual radios used for radio based telemetry systems.
8) Panel inspections:
a) Engineer will inspect each control panel for completeness, workmanship, fit and finish, and compliance with the Contract Documents and the accepted shop drawings.
(1) Inspection to include, as a minimum: Layout, mounting, wire and data cable routing, wire tags, power supply,
components and wiring, I/O components layout (including terminals, wiring and relays), device layout on doors and front panels, and proper ventilation operation.
b) Inspection forms:
(1) Provide panel inspection forms as part of the FAT
procedures submittal.
(2) A sample FAT control panel form has been provided at the end of this Section.
9) I/O test:
a) Engineer will verify that I/O is properly wired to field terminals and is properly mapped into the PLC and the rest of the SCADA system, including all operator interface devices.
b) Test methodology:
(1) Discrete inputs:
(a) Apply appropriate input from simulator at panel
terminal, observe input card indicator, observe data
value at each indicated data address, and observe
data received at field wiring terminals or operator
interface screen.
(2) Discrete outputs:
(a) Issue commands from operator interface screen or
PLC, verify output card indicator light, and measure
response at field wiring terminals or multimeter.
(3) Analog inputs:
(a) Apply appropriate analog input signal at panel
terminals on simulator, observe data value at each
indicated data address, and observe data properly
received at field wiring terminals or operator interface screen.
(b) Check each point at 0 percent, 50 percent, and
100 percent of scale.
(4) Analog outputs:
(a) Enter scaled values in the output buffer file, observe the output data file value, and measure appropriate
response at field wiring terminals or multimeter.
(b) Check each point at 0 percent, 50 percent, and
100 percent of scale.

Page 2343 of 3040 ends

Commissioning for Instrumentation and Controls
17950-8 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17950 (CONFORMED) c) Test forms to include, but not be limited to the following data:
(1) PLC and panel number.
(2) I/O type.
(3) I/O tag name.
(4) Rack/slot/number of I/O point.
(5) Check-off for correct response for each I/O point.
(6) Comments field.
(7) Initials of individual performing test.
(8) Date test was performed.
(9) Witness signature lines.
10) System configuration test:
a) Demonstrate and test the setup and configuration of operator stations, servers, development stations, and peripherals. b) Demonstrate utility software and functions, such as virus protection, backup, optical drive burning, network monitoring, etc.
c) Demonstrate the proper operation of peripheral hardware. d) Demonstrate general HMI/SCADA functions.
e) Demonstrate proper operation of log-on and other security access functions.
f) Demonstrate the proper operation of all historical data storage, trend, display, backup, and report functions.
g) Test automatic fail over of redundant equipment.
h) Demonstrate the proper operation of the alarm display and acknowledgement functions.
i) For any fault tolerant networks, such as ring topology networks, disconnect each segment of the network individually to
demonstrate proper failover and alarming.
j) Test forms:
(1) For each test, list the specification page and paragraph of the function demonstrated, and provide a description of the function.
(2) List the specific tests and steps to be conducted.
(3) For each function, list all of the different sub-functions or ways the function can be used, and provide a test check-off for each:
(a) Include signature and date lines.
11) Engineer approval of the FAT Communication Testing activities is required before proceeding to FAT Platform Testing.
e. FAT Platform Testing - Control logic test:
1) Verify the PLC, HMI and SCADA, provides monitoring and control functionality based upon specified and designed control requirements.
2) Testing requirements:
a) Demonstrate each function described in the Control Strategies. b) Demonstrate in detail how each function operates under a variety of operating scenarios.
(1) Test to verify the application of each general control strategy function to each specific control strategy or loop description.

Page 2344 of 3040 ends

Commissioning for Instrumentation and Controls
17950-9 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17950 (CONFORMED) c) Demonstrate the proper operation of the programming and configuration for each control strategy or loop description. (1) Test each strategy or loop description on a sentence by sentence and function by function basis.
(2) Loops with similar or identical logic must each be tested individually.
(3) Test the boundaries of each numeric operator input by entering values outside of the allowable range.
d) Demonstrate the proper operation of all digital communication links and networks.
(1) Verify each digital communication I/O point.
e) Failure testing: Demonstrate how the system responds to and recovers from abnormal conditions including, but not limited to:
equipment failure, operator error, communications subsystem error, communications failures, simulated/forced software lockups, power failure (both utility power and power to HMI and/or SCADA hardware), process equipment failure, and high system loading conditions.
3) Test forms:
a) Submit completed test forms for each loop including but not limited to the fully revised and approved control strategy. b) Identify the cause and effect as each I/O point is toggled through the simulator.
(1) Identify and track proper and/or improper operation of the loop.
c) Note any deficiencies or operational changes on the forms for correction and documentation:
(1) Include signature and date lines.
4) Engineer approval of the FAT submittal is required prior to shipment of system components.

2. Owner training:
a. Demonstration requirements are specified in this Section.

Table 1
Course Title
Minimum
Course
Length
(hours per
session)
Personnel
(Estimated
Number
of Students)
Minimum
Number
of Sessions
System Overview 4 5 1
Operator Training - Basic 12 5 2
Operator Training - Advanced 8 5 2
PLC Hardware 8 5 1
PLC Software 16 5 1
LOI Hardware and Software 6 5 1
Network Equipment 6 5 1

Page 2345 of 3040 ends

Commissioning for Instrumentation and Controls
17950-10 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17950 (CONFORMED) Table 1
Course Title
Minimum
Course
Length
(hours per
session)
Personnel
(Estimated
Number
of Students)
Minimum
Number
of Sessions
Follow-Up Training 8 5 2
Instrument Training 12 3 1
Analytical Instrument Training 4 3 2

3. Training course requirements:
a. System overview training:
1) Furnish training courses that give the Owner’s supervisory level personnel and overview of all elements of the PCIS system that focus on the overall functional aspect of elements of the control system and provide an understanding of the interaction of the various components.
2) Furnish a training course that gives the Owner’s supervisory level personnel and overview of the new Contractor-provided elements of the PCIS system. Focus on the overall functional aspects of each new elements of the control system, particularly the mechanical system vendor-provided control packages.
b. Operator training:
1) Furnish training courses that instruct system operators in the efficient operation of all aspects of the PCIS that include not only the general operation of the control system but also the operation of specific system features.
2) Furnish training courses that instruct system operators in the efficient operation of Contractor-provided aspects of the PCIS that include not only the general operation of each control system but also the operation of specific system features.
3) Operator’s training shall include the following for each vendor package and programmable device:
a) Control system overview: Architecture, equipment functions, software components, etc.
b) Display navigation, overview, and types of displays. c) Process and equipment monitoring and control: Basic principles and operation.
d) Logging ON and OFF the system and description of the security and access system.
e) Alarm subsystem.
f) Trending: Provide a thorough session on how to use all trending functions.
g) Reports: How to access, print, and review content.
h) Control strategies: Present an average 15-minute review of each control strategy, including a hands-on demonstration of screens and operator functions for each.
i) Instruction on the use of all operational functionality alarm logging, trending, displays, database, reports, and control

Page 2346 of 3040 ends

Commissioning for Instrumentation and Controls
17950-11 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17950 (CONFORMED) software developed for the Project and incorporated in the installed PCIS system.
c. PLC hardware training:
1) Furnish training on PLC hardware and on related components, including battery backup equipment, UPSs, LOI hardware, control circuits, and analog circuits.
2) Furnish training on PLC hardware principles, product features, proper installation, operation, troubleshooting, and maintenance. 3) PLC training may be provided by manufacturer’s certified trainers. d. PLC software training:
1) Furnish training on PLC software.
2) 2 types of training are required, basic and project-specific:
a) Basic PLC software training covers the principles of PLC programming and the specific features and function of the PLC products used on this Project, provided by one of the PLC manufacturer’s certified trainers.
b) Project-specific PLC software training covers the programming conventions, new standardized software modules, specific control strategy programs, and documentation created for the Work performed under this Contract. This training includes the specific knowledge needed to modify, expand, duplicate, troubleshoot, and repair the PLC programs provided under this Contract, provided by a qualified member of the ICSC who is thoroughly familiar with the delivered system, and is one of the senior programmers who programmed the PLCs for this Project. e. LOI hardware and software training:
1) Provide the following:
a) Overview of hardware and firmware, including starting, stopping, and PLC interface.
b) Configuration of tag database.
c) Creating, editing, and saving display screens.
d) Troubleshooting.
f. Network equipment training:
1) Furnish basic training on all network hardware, switch and router configuration and software, and network monitoring software. 2) Include a detailed description and explanation of the installed network architecture, media, and functions.
3) Furnish an overview of the function and operation of each piece of network equipment.
4) Furnish training on network maintenance troubleshooting and repair. 5) Furnish training on how to install spare or off-line backup equipment. 6) Basic network overview:
a) Discuss a basic network overview for each site.
b) Discuss the architecture (loop, star, etc.), media redundancy, and items that are not readily apparent to staff.
c) Discuss how to monitor the network health through the HMI network screen.
d) Discuss both enterprise level networks, the PCS
communications network, and the field network.

Page 2347 of 3040 ends

Commissioning for Instrumentation and Controls
17950-12 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17950 (CONFORMED) 7) Ethernet switches:
a) Discuss the various types of switches (Layer 2, Layer 3, etc.). b) Discuss switch health monitoring through the HMI.
c) Discuss the VLAN configuration (what ports should be used for what network, etc.).
d) Discuss testing procedures.
8) Field networks:
a) General:
(1) Discuss general principles behind likely device failures and actions to take to resolve such failures for each type of field network.
b) DLR networks:
(1) Discuss how to add non-DLR equipped devices to a DLR network.
(2) Discuss how to monitor and test DLR network health
through an ETAP module or DLR capable switch.
g. Follow-up training:
1) Provide a series of on-site follow-up training classes beginning after process start-up of the SCADA/PCIS system. The intent for these classes is to provide the Owner’s personnel the opportunity for a review and “refresher” of the training topics and material after they have had some experience using the system.
2) Mutually schedule and develop the content of these classes with the Owner no later than 1 month before the beginning of the first session:
a) Schedule at the Owner’s discretion on non-consecutive days spaced out over the process start-up and warranty period. h. Instrumentation training:
1) Furnish training covering all instruments and control panels. 2) Furnish the specified quantity of training, allocated to cover new instruments and hardwired controls as specified in this Section and specifically determined in the accepted training plan.
3) Train maintenance staff in the use, cleaning, calibration, maintenance, and troubleshooting of all the instruments furnished within this Project.
4) Furnish training on the operation of new hardwired controls. i. Analytical instrument training:
1) Furnish training covering all analytical instruments. 2) Furnish the specified quantity of training, allocated to cover new analytical instruments as specified in this Section and specifically determined in the accepted training plan.
3) Train maintenance staff in the use, cleaning, calibration, maintenance, and troubleshooting of all the analytical instruments furnished within this Project.
4) Provide training by manufacturer.

4. Recording training sessions:
a. Record all training.
b. Produce audio-visual presentations by recording the actual training sessions of the Owner's personnel.
c. Furnish digital video disk (DVD) format.

Page 2348 of 3040 ends

Commissioning for Instrumentation and Controls
17950-13 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17950 (CONFORMED) d. These disks become the property of the Owner and cover, in detail, the training for the specific hardware and software of all the systems provided for the Project.
e. Provide all the necessary cameras and recording equipment.

5. Installation testing:
a. Calibration:
1) Performed by Contractor and ICSC.
2) Calibrate and adjust all instruments, devices, valves, and systems, in conformance with the component manufacturer's instructions and as specified in these Contract Documents.
3) Replace either individually or within a system, defective elements that cannot achieve proper calibration or accuracy.
a) Calibration for discrete devices:
(1) Calibrate and adjust devices for reliable operation and to avoid nuisance tripping.
b) Calibration for ultrasonic and radar level devices:
(1) Provide Echo Transmission and signal quality on level transmitters including guided and unguided units.
(a) Submit printout of the actual transmission and
parameters.
(2) Adjust mounting, as required, to obtain accurate readings. (3) Post mounting: Provide any additional calibration required by manufacturer.
c) Calibrating analog transmitters:
(1) Components having adjustable features are to be set accurately for the specific conditions and applications of this installation.
(2) Test and verify that components and/or systems are within the specified limits of accuracy.
(3) Calibration points:
(a) Calibrate each analog instrument at 0 percent,
25 percent, 50 percent, 75 percent, and 100 percent of
span, using test instruments with accuracies traceable
to NIST.
(4) Field verify calibration of instruments including units that have been factory-calibrated to determine whether any of the calibrations are in need of adjustment.
d) Analyzer calibration:
(1) Calibrate and test each analyzer system as a workable system after installation. Follow the testing procedures directed by the manufacturers' technical representatives. (2) Submit completed instrument calibration sheets for every field instrument and analyzer.
(3) Calibration tags:
(a) Attach a calibration and testing tag to each instrument, piece of equipment, or system.
(b) Sign the tag when calibration is complete.
e) Calibration for industrial networking test equipment:
f) Submit calibration documentation.

Page 2349 of 3040 ends

Commissioning for Instrumentation and Controls
17950-14 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17950 (CONFORMED) b. Loop check:
1) Performed by the Contractor.
2) Cabling installed, terminated, and labeled.
3) Perform continuity check of wiring to each field device through intermediate devices to field terminals in the cabinet. 4) Complete loop check form for each device.
5) Submit loop check test results before proceeding to the next step. c. Loop validation tests:
1) Performed by the Contractor, ICSC, and manufacturer's representative, working together, and witnessed by the Owner or Owner's representative.
2) Perform tests on the signal from each field device through intermediate devices to the I/O module on the PLC.
a) The PLC may or may not be connected to the network.
3) Engineer approval of the loop validation test submittal is required before proceeding to CEET.
d. Copper Ethernet cable acceptance testing:
1) All testing procedures and field-test instruments shall comply with applicable requirements of:
a) TIA-1152 - Requirements for Field Test Instruments and Measurements for Balanced Twisted-Pair Cabling.
b) TIA-568.0-E - Generic Telecommunications Cabling for Customer Premises.
c) TIA-568.1-E - Commercial Building Telecommunications Infrastructure Standard.
d) TIA-568.2-D - Balanced Twisted-Pair Telecommunications Cabling and Components Standard.
e) Copper Ethernet cable installation testing as specified in Section 16950 - Field Electrical Acceptance Tests.
2) Testing shall be performed by trained technicians who have successfully completed an appropriate training program and have obtained a certificate as proof thereof shall execute the tests. These certificates may have been issued by any of the following organizations or an equivalent organization:
a) Manufacturer of the connectors or cable.
b) Manufacturer of the test equipment used for the field certification.
c) Training organizations (e.g., BICSI).
3) Submit the following information before testing begins:
a) Manufacturer’s catalog sheets, specifications, and the most recent calibration report for the test equipment.
b) Certificate of testing technician’s training.
c) A schedule of all balanced twisted-pair copper links to be tested, including:
(1) Cable identification as it appears on the cable records. (2) Cable identification as it appears on the individual test reports.
(3) Cable identification as specified in Section 16075 - Identification for Electrical Systems.
d) Sample test reports.

Page 2350 of 3040 ends

Commissioning for Instrumentation and Controls
17950-15 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17950 (CONFORMED) e) All installed cabling Permanent Links shall be field-tested and pass the test requirements and analysis as described below. (1) Any Permanent Link that fails these requirements shall be diagnosed and corrected.
(2) Any corrective action that must take place shall be documented and followed with a new test to prove that the corrected Permanent Link meets performance
requirements.
(3) The final and passing result of the tests for all Permanent Links shall be provided in the test results documentation in accordance with the testing requirements.
f) Acceptance of the test results shall be given in writing after the project is fully completed and tested in accordance with Contract Documents and to the satisfaction of the Engineer.
4) Cable field-test instruments:
a) The field-test instrument shall be within the calibration period recommended by the manufacturer, typically 12 months.
b) Certification tester requirements:
(1) Level III in accordance with TIA-1152.
(2) Independent verification of accuracy.
(3) Must be capable of storing more than 10,000 results for all required measurements.
(4) Manufacturer: The following or equal:
(a) Fluke CableAnalyzer Industrial Ethernet Kit,
DSX2-5-IE-K1.
c) Permanent Link adapters:
(1) Use manufacturer’s adapter for connecting to tested equipment.
(a) Patch cables shall not be used for testing.
(2) RJ45 plug must meet the requirements for NEXT, FEXT and Return Loss in accordance with TIA-568.2-D Annex C. d) Measurement capabilities:
(1) Wire Map.
(2) Length.
(3) Propagation Delay.
(4) Delay Skew.
(5) DC Loop Resistance.
(6) DC Resistance Unbalance.
(7) Insertion Loss.
(8) NEXT (Near-End Crosstalk).
(9) PS NEXT (Power Sum Near-End Crosstalk).
(10) ACR-N (Attenuation to Crosstalk Ratio Near-End).
(11) PS ACR-N (Power Sum Attenuation to Crosstalk Ratio Near-End).
(12) ACR-F (Attenuation to Crosstalk Ratio Far-End).
(13) PS ACR-F (Power Sum Attenuation to Crosstalk Ratio Far-End).
(14) Return Loss.
(15) TCL (Transverse Conversion Loss).

Page 2351 of 3040 ends

Commissioning for Instrumentation and Controls
17950-16 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17950 (CONFORMED) (16) ELTCTL (Equal Level Transverse Conversion Transfer Loss).
(17) Time Domain Reflectometer.
(18) Time Domain Xtalk Analyzer.
5) Testing requirements:
a) Field-test instruments shall have the latest software and firmware installed.
b) Permanent Link test results including the individual frequency measurements from the tester shall be recorded in the test instrument upon completion of each test for subsequent
uploading to a PC in which the administrative documentation (reports) may be generated.
c) Testing shall be performed on each cabling segment from connector to connector.
(1) Sampling is not acceptable.
d) The installer shall build a reference link:
(1) All components shall be anchored so it is not possible to disturb them.
(2) The technician is to conduct a Permanent Link test each day, for each type of category cable used, to ensure no degradation of the tester or its Permanent Link adapters. e) Unless noted otherwise tests shall use the following frequency resolution:
(1) 1 - 31.25 MHz: 150 kHz.
(2) 31.25 - 100 MHz: 250 kHz.
(3) 100 - 250 MHz: 500 kHz.
f) Wire Map measurement:
(1) Wire map test is intended to verify pin-to-pin termination at each end and check for installation connectivity errors. For each of the 8 conductors in the cabling, the wire map
indicates:
(a) Continuity to the remote end.
(b) Shorts between any two or more conductors.
(c) Reversed pairs.
(d) Split pairs.
(e) Transposed pairs.
(f) Distance to open on shield.
(g) Any other miss-wiring.
(h) The correct connectivity of telecommunications
outlets/connectors is defined in TIA-568.2-D:
• 2 color schemes are permitted.
• User shall define which scheme is to be used.
• Field tester shall document which color scheme
was used.
g) Length measurement:
(1) Record the length of each cable. Use the physical length of the link calculated using the pair with the shortest electrical delay for reporting and to determine pass/fail.
(2) Pass or fail criteria is based on the maximum length allowed for the Permanent Link as specified in TIA-568.D-2 plus the nominal velocity of propagation (NVP) uncertainty

Page 2352 of 3040 ends

Commissioning for Instrumentation and Controls
17950-17 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17950 (CONFORMED) of 10 percent. For a Permanent Link, the length
measurement can be 325 feet before a fail is reported.
h) Propagation Delay measurement:
(1) Is the time it takes for a signal to reach the end of the link. (2) The measurement shall be made at 10 MHz in accordance with TIA-1152.
(3) The propagation delay of each balanced twisted pair shall be recorded.
(4) Is not to exceed 498 ns in accordance with TIA-568.2-D Section 6.4.21.
i) Delay Skew measurement:
(1) Is the difference in propagation delay at 10 MHz between the shortest delay and the delays of the other wire pairs. (2) The delay skew of each balanced twisted pair shall be recorded.
(3) Is not to exceed 44 ns in accordance with TIA-568.2-D Section 6.4.22.
j) DC Resistance:
(1) Often reported as Resistance, is the loop resistance of both conductors in the pair.
(2) Is not specified in TIA-1152 but shall be recorded for all 4 pairs.
k) DC Resistance Unbalance:
(1) Often reported as Resistance Unbalance, is the difference in resistance of the 2 wires within the pair.
(2) Is not specified in TIA-1152 for a Permanent Link but shall be recorded for all 4 pairs.
l) Insertion Loss:
(1) Is the loss of signal strength over the cabling (in dB). (2) Worst case shall be reported for all 4 pairs in one direction only.
(3) Reported margins found to be within the accuracy of the field tester shall be marked with an asterisk.
(4) Is not to exceed the Category 6 Permanent Link limits in accordance with TIA-568.2-D Section 6.4.10.
m) NEXT (Near-End Crosstalk):
(1) Is the difference in amplitude (in dB) between a transmitted signal and the crosstalk received on other wire pairs at the same end of the cabling.
(2) Shall be measured in both directions (12 pair to pair possible combinations).
(3) Both worst case and worst margins shall be reported. (4) Is not to exceed the Category 6 Permanent Link limits in accordance with TIA-568.2-D Section 6.4.11.
(5) Reported margins found to be within the accuracy of the field tester shall be marked with an asterisk (*).
(6) The Time Domain Xtalk data shall be stored for any
marginal or failing NEXT results.

Page 2353 of 3040 ends

Commissioning for Instrumentation and Controls
17950-18 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17950 (CONFORMED) n) PS NEXT (Power Sum Near-End Crosstalk):
(1) Is the difference (in dB) between the test signal and the crosstalk from the other pairs received at the same end of the cabling.
(2) Shall be measured in both directions (8 pair possible combinations).
(3) Both worst case and worst margins shall be reported. (4) Is not to exceed the Category 6 Permanent Link limits in accordance with TIA-568.2-D Section 6.4.12.
(5) Reported margins found to be within the accuracy of the field tester shall be marked with an asterisk (*).
(6) Time Domain Xtalk data shall be stored for any marginal or failing PS NEXT results.
o) ACR-N (Attenuation Crosstalk Ratio Near-End):
(1) Is a calculation of NEXT minus Insertion Loss of the disturbed pair in dB.
(2) Shall be calculated in both directions.
(3) Is not specified in TIA-1152 but shall be recorded for all 12 possible combinations.
p) PS ACR-N (Power Sum Attenuation Crosstalk Ratio Near-End):
(1) Is a calculation of PS NEXT minus Insertion Loss of the disturbed pair in dB.
(2) Shall be calculated in both directions.
(3) Is not specified in TIA-1152 but shall be recorded for all 8 possible combinations.
q) ACR-F (Attenuation Crosstalk Ratio Far-End):
(1) Is a calculation of FEXT minus Insertion Loss of the disturbed pair in dB.
(2) Shall be measured in both directions (24 pair to pair possible combinations).
(3) Both worst case and worst margins shall be reported. (4) Is not to exceed the Category 6 Permanent Link limits in accordance with TIA-568.2-D Section 6.4.14.
(5) Reported margins found to be within the accuracy of the field tester shall be marked with an asterisk (*).
r) PS ACR-F (Power Sum Attenuation Crosstalk Ratio Far-End):
(1) Is a calculation of PS FEXT minus Insertion Loss of the disturbed pair in dB.
(2) Shall be measured in both directions (8 pair possible combinations).
(3) Both worst case and worst margins shall be reported. (4) Is not to exceed the Category 6 Permanent Link limits in accordance with TIA-568.2-D Section 6.4.16.
(5) Reported margins found to be within the accuracy of the field tester shall be marked with an asterisk (*).
s) Return Loss:
(1) Is the difference (in dB) between the power of a transmitted signal and the power of the signals reflected back.
(2) Shall be measured in both directions (8 pair possible combinations).
(3) Both worst case and worst margins shall be reported.

Page 2354 of 3040 ends

Commissioning for Instrumentation and Controls
17950-19 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17950 (CONFORMED) (4) Shall be ignored at all frequencies where the Insertion Loss is less than 3 dB for that pair.
(5) Is not to exceed the Category 6 Permanent Link limits in accordance with TIA-568.2-D Section 6.4.9.
(6) Reported margins found to be within the accuracy of the field tester shall be marked with an asterisk (*).
(7) Time Domain Reflectometer data shall be stored for any marginal or failing Return Loss results.
t) TCL (Transverse Conversion Loss):
(1) Is the ratio (in dB) between a differential mode signal inject at the near-end and the common-mode signal measured at
the near-end on the same wire pair.
(2) Shall be measured in both directions.
(3) Is not specified in TIA-1152 for a Permanent Link but shall be recorded for all 8 possible combinations.
u) ELTCTL (Equal Level Transverse Conversion Transfer Loss):
(1) Is the ratio (in dB) between a differential mode signal inject at the near-end and the common-mode signal measured at
the far end on the same wire pair minus the Insertion Loss of that pair.
(2) Shall be measured in both directions.
(3) Is not specified in TIA-1152 for a Permanent Link but shall be recorded for all 8 possible combinations.
6) Test results documentation:
a) The detailed test results documentation data is to be provided in an electronic database for each tested balance twisted-pair and shall contain the following information:
(1) The overall Pass/Fail evaluation of the link-under-test. (2) The date and time the test results were saved in the memory of the tester.
(3) The identification of the customer site as specified by the end-user.
(4) The name of the test limit selected to execute the stored test results.
(5) The name of the personnel performing the test.
(6) The version of the test software and the version of the test limit database held within the test instrument.
(7) The manufacturer, model and serial number of the field-test instrument.
(8) The adapters used.
(9) The factory calibration date.
(10) Wire Map.
(11) Propagation Delay values, for all 4 pairs.
(12) Delay Skew values, for all 4 pairs
(13) DC Resistance values, for all 4 pairs
(14) DC Resistance Unbalance, values for all 4 pairs
(15) Insertion Loss, worst case values for all 4 pairs
(16) NEXT, worst case margin and worst case values, both directions
(17) PS NEXT, worst case margin and worst case values, both directions.

Page 2355 of 3040 ends

Commissioning for Instrumentation and Controls
17950-20 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17950 (CONFORMED) (18) ACR-F, worst case margin and worst case values, both directions.
(19) PS ACR-F, worst case margin and worst case values, both directions.
(20) Return Loss, worst case margin and worst case values, both directions.
(21) TCL, worst case values both directions.
(22) ELTCTL, worst case values, both directions.
(23) Time Domain Crosstalk data if the link is marginal or fails. (24) Time Domain Reflectometer data if the link is marginal or fails.
b) Maintain a set of “red-line” throughout during construction:
(1) Drawings shall be available for review at any time as requested by Owner or Engineer.
(2) Provide record copy drawings at the end of the project shall be in CAD format and include notations reflecting the as built conditions of any additions to or variation from the drawings provided such as, but not limited to cable paths and termination point.
(3) The as built drawings shall include, but are not limited to block diagrams, frame and cable labeling, cable termination points, equipment room layouts and frame installation
details.
(4) The as builts shall include all field changes made up to construction completion:
(a) Field directed changes to pull schedule.
(b) Horizontal cable routing changes.
7) Associated detail drawings. Engineer approval of the copper Ethernet cable acceptance-testing submittal is required before proceeding to CEET.
e. Complete End-to-End Testing (CEET):
1) Performed by Contractor, ICSC, manufacturer's representative working together, with assistance from the OWNER or the inspection staff, as needed.
a) The participants need to be dedicated full-time to CEET. b) ICSC will provide staff to verify input signals at, and create output signals from, an HMI or Engineering Workstation. c) Contractor and ICSC will be responsible for creating field signals and verifying proper operation of final control elements. 2) Prerequisites:
a) CEET cannot begin until the successful completion of the preceding tests:
(1) Calibration.
(2) Loop check.
(3) Loop validation tests.
(4) Copper Ethernet cable acceptance testing.
(5) Industrial network testing.
3) Testing description:
a) This testing is to ensure all I/O signals operate to the intent of the design from the field device to the HMI and all other auxiliary controls and indicators in the PCS.

Page 2356 of 3040 ends

Commissioning for Instrumentation and Controls
17950-21 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17950 (CONFORMED) b) Connect PLC to the network to test signals from the field device through the PLC program, the network, and to the operator’s HMI graphic screens. The outputs will be energized for a duration long enough to verify proper operation of the final control element.
c) SCADA screens:
(1) Test and record operator commands and signal readouts to each operator device where there is more than
one operator interface point.
(2) For each signal, perform separate tests for SCADA
computer screens, local operator interface (LOI) screens, and local control panels.
(3) Retest any loop following any necessary corrections. 4) Check control loops under simulated operating conditions by causing a range of input signals at the primary control elements and observing appropriate responses of the respective control and monitoring elements, final control elements, and the graphic displays associated with the HMI/SCADA system.
a) Use actual process inputs wherever available.
b) Issue commands from the HMI/SCADA system and verify proper responses of field devices.
(1) Test SCADA system inputs from field device to SCADA system operator workstations.
(a) Track responses through trend charts in the
HMI/SCADA system.
(2) Test SCADA system outputs from SCADA operator
workstations to field devices and equipment.
5) Discrete device testing:
a) Exercise each field device providing a discrete input to the HMI/SCADA system in the field and observe the proper
operation shall be observed at the operator workstation:
(1) Test limit switches, set limits mechanically, and observe proper operation at the operator workstation.
(2) Exercise starters, relay contacts, switch contacts, and observe proper operation.
(3) Calibrate and test instruments supplying discrete inputs and observe proper operation.
b) Test each device accepting a discrete output signal from the HMI/SCADA. Perform the appropriate operator action at the SCADA operator stations (including LOIs, if present) and confirm the proper operation of the field device:
(1) Stroke valves through outputs from the HMI/SCADA
system, and confirm proper directional operation. Confirm travel limits and any feedback signals to the HMI/SCADA system.
(2) Exercise motors starters from the HMI/SCADA system and verify proper operation through direct field observation. (3) Exercise solenoids and other field devices from the HMI/SCADA system and verify proper operation through
direct field observation.

Page 2357 of 3040 ends

Commissioning for Instrumentation and Controls
17950-22 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17950 (CONFORMED) 6) Analog device testing:
a) Apply continuously variable up and down analog inputs to verify the proper operation and setting of discrete devices (signal trips, etc.).
b) Apply provisional settings on controllers and alarm setpoints. 7) Analog input:
a) Exercise each field device monitoring the analog signal, through the HMI/SCADA system.
(1) Apply simulated sensor inputs corresponding to 0 percent, 25 percent, 50 percent, 75 percent, and 100 percent of
span for networks that incorporate analog elements and
monitor the resulting outputs to verify compliance to
accuracy tolerance requirements.
8) Analog output:
a) Exercise each field device requiring an analog command signal, through the HMI/SCADA system.
(1) Vary the output from the PLC HMI/SCADA system and
measure the end device position, speed, etc. to confirm the proper operation of the device for the supplied analog
signal.
(2) Manually set the output from the HMI/SCADA screen at 0 percent, 25 percent, 50 percent, 75 percent, and
100 percent and measure the response at the final device and at any intermediate devices.
9) Submit completed test forms:
a) Discrete instrument input devices:
(1) Switch setting, contact action, and dead band.
(2) Valve position switches:
(a) Response in the PLC as the valve is stroked from the PLC.
(b) Field observed actual valve position, and valve
indicator position as the valve is stroked from the PLC. (3) Operator interface switches (control stations and other pilot devices) and associated response.
(4) Starter and drive auxiliary device contact response. (5) Response of all other discrete inputs to the PLC.
(6) Test equipment used and associated serial numbers.
b) Discrete output devices:
(1) Observed response of field device to the discrete output from the PLC.
(2) Observe the proper operation of Open, Close, Start, Stop, On, Off, etc.
(3) Test equipment used and associated serial numbers.
c) Analog input devices:
(1) Calibration range.
(2) Calibration data: Input, output, and error at each test value. (3) Analog input associated PLC register address.
(4) Value in PLC register at each test point.
(5) Value displayed at each operator interface station (local operator interface displays and SCADA workstations).
(6) Test equipment used and associated serial numbers.

Page 2358 of 3040 ends

Commissioning for Instrumentation and Controls
17950-23 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17950 (CONFORMED) d) Analog output devices:
(1) Calibration range.
(2) Test value at each test point.
(3) Analog output associated PLC register address.
(4) Control variable value at field device at each test point. (5) Physical device response at each test point:
(a) Response to be actual valve position, or motor speed, etc.
(6) Test equipment used and associated serial numbers.
10) Failure testing:
a) Demonstrate how the system reacts and recovers from
abnormal conditions including, but not limited to:
(1) Equipment failure.
(2) Communications sub-system error.
(3) Power failure.
(4) Process equipment failure.
(5) High system loading conditions.
11) Engineer approval of the CEET submittals is required before proceeding to Functional Testing.

6. Functional testing:
a. General:
1) Testing to demonstrate proper operation of systems with process equipment operating over full operating ranges under conditions as closely resembling actual operating conditions as possible. 2) Performed by Contractor, ICSC, manufacturer's representative working together, with assistance from the OWNER or the inspection staff, as needed.
3) Additional tests are specified in other Instrumentation and Control Sections.
4) Follow approved detailed test procedures and check lists for Functional Test activities.
b. Control logic operational validation:
1) The purpose of control logic validation is to field test the operation of the complete control system, including all parts of the HMI/SCADA system, all control panels (including vendor control panels), all control circuits, all control stations, all monitored/controlled equipment, and final control elements.
2) Demonstrate control functionality shown on the P&IDs, control schematics, and other drawings, and specified in the loop descriptions, control strategies, Electrical Specifications, and Mechanical Equipment Specifications.
3) Test in detail on a function-by-function and sentence-by-sentence basis.
4) Thoroughly test hardware and software functions:
5) Including all hardwired and software control circuit interlocks and alarms.

Page 2359 of 3040 ends

Commissioning for Instrumentation and Controls
17950-24 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17950 (CONFORMED) 6) Test final control elements, controlled equipment, control panels, and ancillary equipment under startup, shut down, and steady-state operating conditions to verify all logic and control is achieved. 7) Control logic validation tests to include, but not limited to: a repeat of all control logic tests from the FAT, modified and expanded to include all field instruments, control panels, circuits, and equipment. c. Loop tuning:
1) Optimally tune all electronic control stations and software control logic incorporating proportional, integral, or derivative control. Apply control signal disturbances at various process variable levels and adjusting the gain, reset, or rate settings as required to achieve proper response.
2) Verify the transient stability of final control elements operating over the full range of operating conditions, by applying control signal disturbances, monitoring the amplitude and decay rate of control parameter oscillations and making necessary controller adjustments as required to eliminate excessive oscillatory amplitudes and decay rates. As a minimum, achieve 1/4-wave amplitude decay ratio damping (subsidence ratio of 4) under the full range of operating conditions.
3) If excessive oscillations or system instability occur, as determined by the Engineer, continue tuning and parameter adjustments, or develop and implement any additional control algorithms needed to achieve satisfactory control loop operation.
4) Functional validation sheets:
a) Document each Functional test on an approved test form. b) Document loop tuning with a report for each loop, including two-pen chart recordings showing the responses to step
disturbance at a minimum of 3 setpoints or process rates approved by the Engineer. Show tuning parameters on the charts, along with time, date, and sign-off by Contractor and Engineer.
c) Include on the form, functions which can be demonstrated on a loop-by-loop basis:
(1) Loop number and P&ID number.
(2) Control strategy, or reference to specification tested. (3) Test procedures: Where applicable, use the FAT
function-by-function, sentence-by-sentence loop test
checklist forms modified to meet the requirements of the Functional test. Otherwise, create new forms.
d) For functions that cannot be demonstrated on a loop-by-loop basis (such as overall plant power failure), include on the test form a listing of the specific steps and tests to be conducted.

Include with each test description the following information:
(1) Specification page and paragraph of function
demonstrated.
(2) Description of function and/or text from specification. (3) Test procedures: use the FAT loop test checklist forms modified to meet the specific testing conditions of the Functional test.

Page 2360 of 3040 ends

Commissioning for Instrumentation and Controls
17950-25 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17950 (CONFORMED) 5) Functional certification:
a) Provide Manufacturer’s Certificate of Installation and Functionality Compliance as specified in Section 01756 - Commissioning.
(1) Including all test forms with test data entered, submitted to the Engineer with a clear and unequivocal statement that all Functional test requirements have been satisfied.

7. Clean Water Facility Testing:
a. ICSC shall be onsite to support Clean Water Test activities and provide functional changes as required.

C. Process Start-up Phase:

1. Process Start-up:
a. ICSC shall be onsite to support Process Start-up activities and provide functional changes as required.

2. Process Operation Period:
a. ICSC shall be available to support Process Operational Period and provide functional changes as required.

3. PCIS Optimization and Fine-Tuning:
a. General:
1) After the Process Operational Period, test PCIS system for additional 60 days as specified in this Section to identify issues and make corrections, as needed.
2) This is part of the Work that must be completed as a condition of substantial completion and final completion for the entire Project. 3) The complete PLC control and HMI/SCADA system must run continuously for the duration of the PCIS Optimization and Fine-Tuning.
4) Test and use the entire process control system under standard operating conditions.
5) Exercise all system functions.
6) Log failure, any system interruption and accompanying component, subsystem, or program failure including time of occurrence, duration of each failure, failure classification, and cause:
a) Provide a competently trained technician or programmer on call for the Project Site during all normal working days and hours from the start of the PCIS Optimization and Fine-Tuning until final acceptance of the system.
(1) Response time to the Project Site: 24 hours or less, for a major failure.
b. SCADA system testing:
1) Exercise each system function, e.g., status report, alarms, logs, and displays several times at a minimum, and in a manner that approximates "normal" system operation.
2) Failure of the HMI/SCADA system during testing shall be considered as indicating that the programs and operating system do not meet the requirements of the specifications.
a) Corrective action is required before restarting the PCIS Optimization and Fine-Tuning.
3) Only those components, sub-systems, and systems covered in this Section and supplied under this Contract shall be considered for this

Page 2361 of 3040 ends

Commissioning for Instrumentation and Controls
17950-26 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17950 (CONFORMED) acceptance test. Problems and failures of other systems shall not be considered as part of this test, except as they display the capabilities of this system to detect failures.
4) Failures:
a) Classify failures as either major or minor:
(1) Minor failure:
(a) A small and non-critical component failure or software problem that can be corrected by the Owner's
operators.
(b) Log this occurrence but this is not a reason for
stopping the test and is not grounds for
non-acceptance.
(c) Should the same or similar component failure occur
repeatedly, this may be considered as grounds for
non-acceptance.
(d) Failure of one printer or operator station is considered a minor failure providing all functions can be provided by backup equipment, i.e., alternate printers and
operator station, and repairs can be made and
equipment returned to service within 3 working days.
(2) Major failure:
(a) Considered to have occurred when a component,
subsystem, software control, or program fault causes a
halt in or improper operation of the system and/or
when a technician's work is required to make a repair
or to re-initiate operation of the system.
(b) Cause termination of the PCIS Optimization and
Fine-Tuning.
(c) Start a new acceptance test when the causes of a
major failure have been corrected.
(d) A failure is also considered major when failure of any control system that results in an overflow, underflow,
overdose, or underdose condition occurs.
5) Technician report:
a) Each time a technician is required to respond to a system malfunction, they must complete a report, which includes details concerning the nature of the complaint or malfunction and the resulting repair action required and taken.
b) If a malfunction occurs which clears itself or which the operator on duty is able to correct, no report is required or logged as specified above.
c) If a technician has performed work but no report is written, then a major failure is considered to have occurred.
d) Each report shall be submitted within 24 hours to the Engineer and the Owner, or its representative.

3.07 FIELD QUALITY CONTROL (NOT USED)

3.08 RE-INSTALLATION (NOT USED)

3.09 ADJUSTING (NOT USED)

Page 2362 of 3040 ends

Commissioning for Instrumentation and Controls
17950-27 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17950 (CONFORMED)

3.10 CLEANING (NOT USED)

3.11 PROTECTION (NOT USED)

3.12 SCHEDULES
A. Example test forms:

1. Example test forms are attached at the end of this Section. They may be used as a starting point for the development of Project-specific test forms for this Project.

2. The example test forms are not intended to be complete or comprehensive.

Edit and supplement the forms to meet the requirements for testing and test forms specified in this Section and other Contract Documents.

END OF SECTION

Page 2363 of 3040 ends
Page 2364 of 3040 ends

Commissioning for Instrumentation and Controls
17950-Attachment A 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17950 (CONFORMED)

ATTACHMENT A - FACTORY ACCEPTANCE TEST - CONTROL PANELS

Page 2365 of 3040 ends
Page 2366 of 3040 ends

Commissioning for Instrumentation and Controls
17950-Attachment A-1 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17950 (CONFORMED)

FACTORY ACCEPTANCE TEST - CONTROL PANELS

1. GENERAL INSPECTION
A. Structural Inspection
Verify Lifting Lugs Installed
Verity enclosure has lock and lock is functional
Confirm that seismic bracing components are provided per manufacturer’s installation instructions B. Exterior Inspection
Cabinet exterior is clean, scratch, and dent free
Inspect externally for corrosion and damage
Verify enclosure door opens and closes easily
Verify enclosure has a 3-point latch
Verify enclosure has a flange mounted disconnect (where voltages greater than 120 VAC enter the cabinet) Verify enclosure has the appropriate NEMA rating (1, 1G, 12, 3R, 4, 4X, etc.) Verify enclosure is the appropriate size (not grossly larger than design, and will still fit in the plant) Nameplates
Cabinet has identification nameplate
All door labels are straight, spelled correctly, and match the tagging defined in the Contract Cabinet has a nameplate that includes the following:

Power source(s) Integrator’s Logo
Circuit ID(s) Short Circuit KAIC ratings
If labels are screwed to door, silicone was utilized to cover screw holes (Labels screwed to the door of a NEMA 4/4X panel technically violates the NEMA rating.)
Door Devices
All devices penetrating the outside of panel have gaskets, silicone or both All door devices are installed (HMIs, Pilot Devices, etc.) Door mounted equipment is mounted straight and square
All exterior or door mounted equipment present and accounted for, installed and securely fastened NEMA classification has not been violated due to penetrations Door mounted equipment has the same NEMA rating as the panel All door mounted equipment installed at the correct height All door mounted equipment installed in the correct positions and order (layout of door mounted equipment is grouped properly and in a logical manner)
Doors with multiple penetrations have adequate bracing (if needed) Visually check condition of indicators , controllers and annunciators Check that pilot lights illuminate correctly
Check the Push-To-Test function
Ensure correct pilot light color
Peripheral Devices
Horn / Beacon is installed (where required)
Silence and Reset pushbutton
PROJECT NAME: TEST DATE:

FACILITY NAME: TESTED BY:

PROCESS AREA: COMPANY:

NETWORK ID: PAGE:

WITNESSED BY: SIGNATURE:

Page 2367 of 3040 ends

Commissioning for Instrumentation and Controls
17950-Attachment A-2 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17950 (CONFORMED)

FACTORY ACCEPTANCE TEST - CONTROL PANELS

1. GENERAL INSPECTION (continued)
C. Interior Inspection
Cabinet is cleaned of marks and dirt.

Inspect internally for corrosion and damage.

Back panel is clean of marks and dirt.

Interior of panel vacuumed and shall be free of all debris.

Check that the panel roof is clean and clear of foreign materials.

Bottom of panel has been cut out (where bottom entry is required), with angle iron welded around the bottom perimeter. Re-painting has been performed.

If internal light door limit switch is provided, ensure the light automatically turns "on" when the doors are open.

Check that a document pocket has been provided.

Intrusion alarms (where required).

Interior Labeling
All panel mounted equipment has identification labeling, by using either a Brothers or Phenolic type tags.

Verify that door mounted components are mounted square and symmetrical.

Verify that nameplates are straight, legible, and spelled correctly.

All terminal blocks are identified/labeled with permanent labels including tight end blocks and caps.

All wiring shrink labeled and or phased correctly to the specifications.

All wire labels shrunk completely rotated and aligned alike for easy identification.

All fuses and circuit breakers are labeled with ID and current rating.

System Integrator’s label or labels installed on door.

Panel manufacturer model/serial number tag is present.

All required safety/warning tags installed and straight.

Correct UL (typically UL 508) or cUL tag installed and registered and all other associated tags installed and straight (the UL tag might not be installed in the panel at the factory test. If the panel is modified due to changes during the factory test or a punch list generated from the factory test, the UL labeling would need to be re-applied. Some UL shops do not apply the UL label until the panel is released to be shipped.).

Wireways
Plastic wire way covers installed properly.

Plastic wireways have no sharp edges.

No wire Ties inside the wireways.

No sharp edges on wire ties.

Separation: White duct is used for DC voltages, Gray duct is used for AC voltages.

Ensure wiring duct is not over-full, includes provision for 20% more wiring and the cover may easily be installed. Panduit recommends 50% duct fill, but 40% is a better practice.

PROJECT NAME: TEST DATE:

FACILITY NAME: TESTED BY:

PROCESS AREA: COMPANY:

NETWORK ID: PAGE:

WITNESSED BY: SIGNATURE:

Page 2368 of 3040 ends

Commissioning for Instrumentation and Controls
17950-Attachment A-3 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17950 (CONFORMED)

FACTORY ACCEPTANCE TEST - CONTROL PANELS

1. GENERAL INSPECTION (continued)
C. Interior Inspection (continued)
Wiring
Visually check terminals and condition of internal wirings Verify that the control panel has been assembled and wired as designed Verify that all components are operational and perform the functions intended Verify that all components are sized appropriately for the application Verify that equipment control circuits function as intended Back of door wiring is labeled and neatly formed
Back panel to door wiring has sufficient bending radius with spiral wrap Wire connection has been verified wired to correct points within the panel Individual wires have been given a pull test to verify a good terminal connection Wire and cable minimum bending radius have not been violated All equipment installed straight and square to back panel Wire colors are correct:

Black and White > AC hot and neutral, respectively
Red > AC control signals
Blue > DC power and control (Blue w/White stripe for DC ground) Yellow > Foreign voltages (those still present when panel power is disconnected) Green > AC equipment ground
Black > TSP (+)
White> TSP(-)
Analog wiring shields are continuous (connected by a dedicated terminal block for such shields) Analog shield wires are grounded within the panel, where not otherwise grounded at the transmitter itself Discrete inputs are separately fused or protected by a circuit breaker on a “per loop” basis Intrinsic Safety Wiring
Ensure wiring associated with intrinsic safety circuits or intrinsic safety barriers is kept away from all other wiring by UL minimum distances or by a physical (grounded metal) barrier preventing nonintrinsically safe wiring from coming in contact with intrinsically safe circuits or wiring Verify all spare terminals are installed according to the percentage listed in the specifications Grounding
Equipped with “Blackburn” or other grounding type lug
Lug is securely fastened to the panel structure
Verify Grounding bar is installed
Verify Isolated ground bar is installed
PROJECT NAME: TEST DATE:

FACILITY NAME: TESTED BY:

PROCESS AREA: COMPANY:

NETWORK ID: PAGE:

WITNESSED BY: SIGNATURE:

Page 2369 of 3040 ends

Commissioning for Instrumentation and Controls
17950-Attachment A-4 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17950 (CONFORMED)

FACTORY ACCEPTANCE TEST - CONTROL PANELS

2. POWER TEST
A. AC Power
AC Power is routed correctly within the panel, and is isolated from DC and network wiring.

All fuses are installed and sized properly.

All breakers are installed and sized properly.
24 VDC Power Supplies are functional.
24 VDC Power fail contacts are functional.
24 VDC power supplies are redundant, and have diode modules enabling the hot swap-over between supplies. 24 VDC supplies are equipped with dry contact failure alarms, wired as PLC inputs to signal failure of any DC power supply. Such alarm inputs to the PLC have been tested as being functional.

Dedicated receptacle is wired to receive a dedicated AC supply.

Verify continuity for all DC commons, ground and AC neutrals.

Verify that the CP temporary input power is connected correctly and is the correct voltage.

Close the CP main circuit breaker(s).

Verify that voltages at subsequent circuit breakers are correct.

Close circuit breakers.

Verify that power feeding interruptible and uninterruptible power supplies is correct.

Turn on power supplies if they are not already on.

Verify that voltages at distribution terminals are correct.

Energize any remaining hardware such as the PLC.

B. Uninterruptible Power Supply (UPS)
Mounted appropriately within the cabinet, on a dedicated shelf, or rear of a swing-out sub panel.

Is equipped with maintenance bypass switch (or at least plug/receptacle means for bypassing the unit).

Test all UPS alarms (on inverter, failure, battery failure etc.) Turn off the AC power supply and verify that the UPS will be switched on to supply the designated vital loads in the control panel.

3. CONTROLS & AUXILIARY DEVICES TEST
Verify all interposing and auxiliary relays are functioning.

Verify panel lights are functioning.

Ventilation and Heating
If ventilation fans are fitted, check the fans operate correctly any associated air filters are clean and not blocked.

Verify components are installed in the correct orientation for proper air flow.

4. HARDWIRED INTERLOCK AND SAFETY TEST
Verify that hardwired interlocks through the control panel as shown on schematic drawings are functioning. For example, outlet high pressure switch interlock to a pump.

Verify that all hardwired safety devices through the control panel is functioning. For example, the pull cord emergency stops of conveyors.

PROJECT NAME: TEST DATE:

FACILITY NAME: TESTED BY:

PROCESS AREA: COMPANY:

NETWORK ID: PAGE:

WITNESSED BY: SIGNATURE:

Page 2370 of 3040 ends

Commissioning for Instrumentation and Controls
17950-Attachment A-5 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17950 (CONFORMED)

FACTORY ACCEPTANCE TEST - CONTROL PANELS

5. PLC TEST
A. Components
PLC interior High Temperature alarm is installed, wired to the PLC, and is shown to be functional.

Relays have transient suppression across their coils. This is particularly important for DC coil relays, where diodes in reverse polarity are often used.

TVSS is installed across the main incoming 120 VAC.

PLC and PLC Rack
Verify all cards are securely seated.

Ensure clearance around PLC rack has been met, such that convective heat transfer is not impeded by devices erroneously mounted in the “no encroachment” area. Confirm with manufacturer clearance recommendations.

B. PLC I/O Test
Furnish I/O test forms and test all the listed input and output points as follows:

Discrete Inputs: Simulate a field contact closure by “shorting” across the appropriate terminal blocks.

Observe the transition between a logical “0” and “1” in the PLC software.

Discrete Outputs: Force the output bit to toggle between logical “0” and logical “1” using the PLC software.

Measure contact resistance at the wired terminal blocks using a digital meter selected for the “ohms” setting.

Analog Inputs: Connect a signal generator to the appropriate terminal blocks. Tailor the connection depending on whether a 2-wire or 4-wire simulation is required. Modulate the 4-20mA signal. Observe the associated PLC internal memory register to transition between 0-65535 or if scaled in engineering units, between 0 and the maximum scaled engineering unit. The latter method is preferred.

Analog Outputs: Force the output register to a value between 0-65535 or 0-100%, if the scaling block can be manipulated. Observe the measured 4-20mA value increment and decrement using a digital ammeter.

C. Redundant Controllers (where required) Test
Remove Communication cable from primary PLC to verify switching to backup PLC Remove Communication cable from backup PLC to verify switching back to primary PLC Remove Power cable from primary PLC to verify switching to backup PLC Remove Power cable from backup PLC to verify switching back to primary PLC D. PLC Control Logic Verification
The PLC control strategy is verified by following the Control Logic Verification Form based on the specifications.

Each control strategy will be verified by simulating the process and checking the state or value of PLC outputs.

The results of equipment status and alarms and process instrument values and trends shall also be verified on the Plant SCADA graphic screens stored in a temporary SCADA computer. Since all PLC input and output wiring has been verified and some field devices are not available during Factory Acceptance Testing, certain inputs will be simulated either by means of additional hardware and/or software as described below.

DI states are either simulated by hardwired switches or forced inputs using a programming terminal.

For example, when starters and drives are not provided as part of the contract, jumpers may be installed from the output call relays to the running confirmation inputs to simulate the running state of the motors.

PROJECT NAME: TEST DATE:

FACILITY NAME: TESTED BY:

PROCESS AREA: COMPANY:

NETWORK ID: PAGE:

WITNESSED BY: SIGNATURE:

Page 2371 of 3040 ends

Commissioning for Instrumentation and Controls
17950-Attachment A-6 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17950 (CONFORMED)

FACTORY ACCEPTANCE TEST - CONTROL PANELS

5. PLC TEST (continued)
D. PLC Control Logic Verification (continued)
Typical Fault Logic
If the fault input is high and the disable (if applicable) for the fault is not high and the common disable (if applicable) is not high begin timing. If any of these conditions changes, stop timing and reset the timer. If the timer reaches its preset, activate the alarm output. If the fault alarm is a shutdown alarm stop the associated motor and latch the alarm so that it remains present even if the condition clears.

The fault condition must return to normal and the alarm must be reset for a latched alarm to clear.

Typical Fail to Start Logic
If the motor is called to run (call output high) and no running feedback is received (running input is low) and the fail to start and common alarm disables (if applicable) are not high start timing. If any of these conditions changes, stop timing and reset the timer. If the timer reaches its preset, activate the alarm output, stop calling the motor and latch the alarm.

6. HMI OR OIT TEST
HMI / OIT Functionality
Communication with PLC
Screen Layouts
Screen Navigation
Set Point Entry
Animation
Color Correctness (Green=Run, Red=Off, Amber=Alarm, or the agreed upon convention) Alarms
Acknowledge and Reset
Security / Access Levels / Passwords

7. NETWORK COMMUNICATION TEST
A. Network Components
Fiber optic cabling terminates in a patch panel
Media converters are installed and functional
Terminating resistors have been installed for trunk/tap topologies or where required Wire and cable bending limitations have not been violated B. Networking Functions
Verify data transfer via the network to different PLCs as shown on the Network Block Diagrams Verify network traffic rate and error margin is acceptable PROJECT NAME: TEST DATE:

FACILITY NAME: TESTED BY:

PROCESS AREA: COMPANY:

NETWORK ID: PAGE:

WITNESSED BY: SIGNATURE:

Page 2372 of 3040 ends

Commissioning for Instrumentation and Controls
17950-Attachment A-7 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17950 (CONFORMED)

FACTORY ACCEPTANCE TEST - CONTROL PANELS

8. FAT DOCUMENTATION AND RECORD
Panel Documentation
As-built panel drawings showing actual panel construction and devices arrangement and c/w Bill of Material.

Panel schematic and interconnection drawings.

P&ID drawings and schematic drawings for the process area controlled by the panel that is to be tested.

I/O list test forms of the process area to be tested.

FAT procedure of the process area to be tested.

Test record forms of the process area to be tested. Forms shall include area for signature of responsible test personnel.

Hard copy of the PLC application program of the process area to be tested.

Hard copy of the HMI/OIT graphic screens of the process area to be tested.

9. FAT TOOLS AND SOFTWARE
Simulation software if required
Digital volt meter Fluke 87
Process meter Fluke 787
Laptop computer with PLC application program
Temporary SCADA computer with HMI software and applicable graphic screens Jumper wires
PROJECT NAME: TEST DATE:

FACILITY NAME: TESTED BY:

PROCESS AREA: COMPANY:

NETWORK ID: PAGE:

WITNESSED BY: SIGNATURE:

Page 2373 of 3040 ends
Page 2374 of 3040 ends

Commissioning for Instrumentation and Controls
17950-Attachment B 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17950 (CONFORMED)

ATTACHMENT B - INSTALLATION AND CERTIFICATION CHECKLIST DOCUMENTATION

Page 2375 of 3040 ends
Page 2376 of 3040 ends

Commissioning for Instrumentation and Controls
17950-Attachment B-1 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17950 (CONFORMED)

INSTALLATION AND CERTIFICATION CHECKLIST

DOCUMENTATION
INSTRUMENT LOOP NO.

SERVICE DESCRIPTION

A COPY OF LATEST ISSUE OF THE FOLLOWING DOCUMENTS ARE INCLUDED IN THIS INSTRUMENT INSTALLATION CERTIFICATION FILE:

INSTRUMENT SPECIFICATION SHEETS (FOR ALL INSTRUMENTS IN THE LOOP)

INSTRUMENT INSTALLATION DETAILS (FOR ALL INSTRUMENTS IN THE LOOP)

INSTRUMENT LOOP WIRING DIAGRAMS

INSTRUMENT INSTALLATION CERTIFICATION CHECKLIST

SIZING CALCULATIONS

INSTRUMENT INSTALLATION SCHEDULE (APPLICABLE PART)

NAMEPLATE SCHEDULE (APPLICABLE PART)

VENDOR LITERATURE CALIBRATION INFORMATION
INSTRUMENT LOOP IS PART OF EQUIPMENT START-UP/SHUTDOWN INTERLOCKS? No Yes REMARKS:

CHECKED BY (COMPANY) ACCEPTED BY
(COMPANY)

SIGNATURE SIGNATURE

DATE DATE

Page 2377 of 3040 ends
Page 2378 of 3040 ends

Commissioning for Instrumentation and Controls
17950-Attachment C 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17950 (CONFORMED)

ATTACHMENT C - SWITCHES INSTALLATION AND CALIBRATION CHECKLIST

Page 2379 of 3040 ends
Page 2380 of 3040 ends

Commissioning for Instrumentation and Controls
17950-Attachment C-1 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17950 (CONFORMED)

SWITCHES

INSTALLATION AND CALIBRATION CHECKLIST
INSTRUMENT LOOP NO.

SERVICE DESCRIPTION
CHECK BELOW, WHEN COMPLETED:

BENCH CALIBRATED PER SPECIFICATION SHEET NO.

VERIFIED PER P&ID NO.

CORRESPONDS TO SPECIFICATION SHEET NO.

WIRING CORRECT PER INSTRUMENT LOOP DRAWING NO.

INSTALLATION CORRECT PER DETAIL NO.

ACCESSORIES ARE PRESENT AND PROPERLY INSTALLED

INSTRUMENT IS ACCESSIBLE FOR MAINTENANCE OR REMOVAL

ENGRAVED LAMINATED NAMEPLATE (NO SPELLING ERRORS) PERMANENTLY INSTALLED INSTRUMENT LOOP IS PART OF EQUIPMENT START-UP/SHUTDOWN INTERLOCKS? No Yes

FIELD CALIBRATION CHECK

CONTACT
NO. FUNCTION
FOR
SIGNAL

CONTACT IS

TO AT SPECIFIED VALUE FOR ACTUAL TRIP POINT WAS
1 ALARM INCR OPEN SET PT = SET PT =
S/D PERM DECR CLOSE RESET = RESET =
2 ALARM INCR OPEN SET PT = SET PT =
S/D PERM DECR CLOSE RESET = RESET =
3 ALARM INCR OPEN SET PT = SET PT =
S/D PERM DECR CLOSE RESET = RESET =
4 ALARM INCR OPEN SET PT = SET PT =
S/D PERM DECR CLOSE RESET = RESET =
NOTE: PERM IS ABBREVIATION FOR PERMISSIVE

Page 2381 of 3040 ends

Commissioning for Instrumentation and Controls
17950-Attachment C-2 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17950 (CONFORMED)

SWITCHES

INSTALLATION AND CALIBRATION CHECKLIST
REMARKS:

CHECKED BY (COMPANY) ACCEPTED BY
(COMPANY)

SIGNATURE SIGNATURE

DATE DATE

Page 2382 of 3040 ends

Commissioning for Instrumentation and Controls
17950-Attachment D 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17950 (CONFORMED)

ATTACHMENT D - TRANSMITTER/CONTROLLER/INDICATOR

INSTALLATION AND CALIBRATION CHECKLIST

Page 2383 of 3040 ends
Page 2384 of 3040 ends

Commissioning for Instrumentation and Controls
17950-Attachment D-1 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17950 (CONFORMED)

TRANSMITTER/CONTROLLER/INDICATOR

INSTALLATION AND CALIBRATION CHECKLIST
INSTRUMENT LOOP IS PART OF EQUIPMENT START-UP/SHUTDOWN INTERLOCKS? No Yes

INSTRUMENT TYPE

INDICATOR

TRANSMITTER CONTROLLER

OTHER DESCRIPTION
INSTRUMENT TAG NO. SERIAL NO.

SERVICE

DESCRIPTION

BENCH CALIBRATION CHECK
INPUT RANGE =

OUTPUT RANGE
=
HEAD CORRECTION = LINEAR
CALIBRATED SPAN = SQUARE ROOT
% CALIB

SPAN DESIRED VALUE ACTUAL VALUE EXPECTED VALUE ACTUAL VALUE 0 50
100
CHECK BELOW, WHEN COMPLETED:

BENCH CALIBRATED PER SPECIFICATION SHEET NO.

VERIFIED PER P&ID NO.

CORRESPONDS TO SPECIFICATION SHEET NO.

WIRING CORRECT PER INSTRUMENT LOOP DRAWING NO.

INSTALLATION CORRECT PER DETAIL NO.

ACCESSORIES ARE PRESENT AND PROPERLY INSTALLED

INSTRUMENT IS ACCESSIBLE FOR MAINTENANCE OR REMOVAL

ENGRAVED LAMINATED NAMEPLATE (NO SPELLING ERRORS) PERMANENTLY INSTALLED

FIELD CALIBRATION CHECK

INPUT RANGE
=

OUTPUT RANGE
=
% CALIB

SPAN DESIRED VALUE ACTUAL VALUE EXPECTED VALUE ACTUAL VALUE 0 50
100

Page 2385 of 3040 ends

Commissioning for Instrumentation and Controls
17950-Attachment D-2 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17950 (CONFORMED)

TRANSMITTER/CONTROLLER/INDICATOR

INSTALLATION AND CALIBRATION CHECKLIST

DIRECT REVERSE
ACTION VERIFIED AT 50% SPAN

ACTION VERIFIED AT SPAN

CONTROLLER SETTINGS

SETTING GAIN PB
RESET
(INTEGRAL)
DERIV.
(RATE)
HIGH
LIMIT
LOW
LIMIT
ELEV.

ZERO
ZERO
SUPP

PRE-TUNE

POST-TUNE

PRE-TUNE SETTINGS

GAIN PB RESET (REPEAT/MIN) RESET (MIN/REPEAT)

DERIVATION
(MINUTES)
FLOW 1.0 100 10 0.1 N/A
LEVEL 1.0 100 MIN. MAX. N/A
PRESSURE 2.0 50 2.0 0.5 N/A
TEMP. 4.0 25 0.1 10 OFF

REMARKS

CHECKED BY
(COMPANY)

ACCEPTED BY
(COMPANY)

SIGNATURE SIGNATURE

DATE DATE

Page 2386 of 3040 ends

Commissioning for Instrumentation and Controls
17950-Attachment E 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17950 (CONFORMED)

ATTACHMENT E - ANALYZERS INSTALLATION AND CALIBRATION CHECKLIST

Page 2387 of 3040 ends
Page 2388 of 3040 ends

Commissioning for Instrumentation and Controls
17950-Attachment E-1 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17950 (CONFORMED)

ANALYZERS

INSTALLATION AND CALIBRATION CHECKLIST
INSTRUMENT LOOP IS PART OF EQUIPMENT START-UP/SHUTDOWN INTERLOCKS? No Yes

TYPE OF INSTRUMENT
INSTRUMENT TAG NO. SERIAL NO.

SERVICE DESCRIPTION

CHECK BELOW, IF TRUE
BENCH CALIBRATED PER SPECIFICATION SHEET NO.

VERIFIED PER P&ID NO.

CORRESPONDS TO SPECIFICATION SHEET NO.

WIRING CORRECT PER INSTRUMENT LOOP DRAWING NO.

INSTALLATION CORRECT PER DETAIL NO.

ACCESSORIES ARE PRESENT AND PROPERLY INSTALLED

INSTRUMENT IS ACCESSIBLE FOR MAINTENANCE OR REMOVAL

ENGRAVED LAMINATED NAMEPLATE (NO SPELLING ERRORS) PERMANENTLY INSTALLED

REMARKS

CHECKED BY (COMPANY) ACCEPTED BY
(COMPANY)

SIGNATURE SIGNATURE

DATE DATE

Page 2389 of 3040 ends
Page 2390 of 3040 ends

Commissioning for Instrumentation and Controls
17950-Attachment F 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17950 (CONFORMED)

ATTACHMENT F - CONTROL VALVES

INSTALLATION AND CALIBRATION CHECKLIST

Page 2391 of 3040 ends
Page 2392 of 3040 ends

Commissioning for Instrumentation and Controls
17950-Attachment F-1 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17950 (CONFORMED)

CONTROL VALVES

INSTALLATION AND CALIBRATION CHECKLIST
INSTRUMENT LOOP IS PART OF EQUIPMENT START-UP/SHUTDOWN INTERLOCKS? No Yes VALVE TAG NO. SERIAL NO.

TRANSDUCER TAG NO. SERIAL NO.

SOLENOID TAG NO. SERIAL NO.

VOLUME BOOSTER TAG
NO.

SERIAL NO.

POSITIONER SERIAL NO.

SERVICE DESCRIPTION

TRANSDUCER CHECK
INPUT RANGE = OUTPUT RANGE =
CALIBRATED SPAN = CALIBRATED SPAN =
BENCH

SPAN DESIRED ACTUAL SPAN EXPECTED ACTUAL
0% 0%
50% 50%
100% 100%
FIELD

SPAN DESIRED ACTUAL SPAN EXPECTED ACTUAL
0% 0%
50% 50%
100% 100%
CHECK BELOW, IF TRUE:

BENCH CALIBRATED PER ABOVE
VERIFIED PER P&ID NO.

CORRESPONDS TO SPECIFICATION SHEET
NO.

VALVE SPECIFICATION NO.

TRANSDUCER SPECIFICATION
NO.

SOLENOID SPECIFICATION
NO.

WIRING CORRECT PER INSTRUMENT LOOP DRAWING NO.

INSTALLATION CORRECT PER INSTRUMENT INSTALLATION DETAILS VALVE DETAIL NO.

TRANSDUCER DETAIL NO.

SOLENOID DETAIL NO.

Page 2393 of 3040 ends

Commissioning for Instrumentation and Controls
17950-Attachment F-2 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/17950 (CONFORMED)

CONTROL VALVES

INSTALLATION AND CALIBRATION CHECKLIST

ACCESSORIES ARE PRESENT AND PROPERLY INSTALLED

INSTRUMENT IS ACCESSIBLE FOR MAINTENANCE OR REMOVAL

ENGRAVED LAMINATED NAMEPLATE (NO SPELLING ERRORS) PERMANENTLY INSTALLED

VALVE CHECK
FLOW

CHECK PROCESS FLOW DIRECTION THROUGH THE VALVE IS CORRECT SAFETY
CHECK

ON LOSS OF AIR VALVE FAILS ON LOSS OF POWER SOLENOID FAILS

OPEN CLOSE TO VENT TO VALVE
TRAVEL
CHECK

FULL OPEN AT FULL CLOSED AT MEASURED TRAVEL

PSI PSI INCHES

SEATING
CHECK

ON BENCH RESULTS ACTUATOR BENCH SET

IN-LINE

POSITIONER CHECK

VALVE FULL OPEN AT PSI TO POSITIONER

VALVE FULL CLOSED AT PSI TO POSITIONER

VOLUME BOOSTER CHECK

BYPASS VALVE (GAIN) ADJUSTING SCREW BACKED OUT TURNS FROM CLOSED TO ENSURE QUICK BUT STABLE OPERATION (TYPICALLY 1-1/2 TO 2 TURNS)

REMARKS

CHECKED BY (COMPANY) ACCEPTED BY (COMPANY)

SIGNATURE SIGNATURE

DATE DATE

Page 2394 of 3040 ends

APPENDIX A

MITIGATION MONITORING AND REPORTING PROGRAM

Page 2395 of 3040 ends
Page 2396 of 3040 ends

MITIGATION MONITORING AND REPORTING PROGRAM
City of Ukiah
Recycled Water Project
Final Initial Study / Mitigated Negative Declaration
SCH #2013032072
Prepared for:

City of Ukiah
Public Works Administration Office
300 Seminary Avenue
Ukiah, CA 95482
Prepared by:

SMB Environmental, Inc.

May 2013
Appendix A-1 8660F10 July 12, 2023 - CONFORMED

Page 2397 of 3040 ends

Appendix A-2 8660F10 July 12, 2023 - CONFORMED

Page 2398 of 3040 ends

Recycled Water Project City of Ukiah
Mitigation Monitoring and Reporting Program
2 INTRODUCTION
Pursuant to the California Environmental Quality Act (CEQA; Public Resources Code Section 21000, et seq. and CEQA Guidelines), the City of Ukiah, California (City) prepared a Public Draft Initial Study/Mitigated Negative Declaration (IS/MND) to evaluate potential environmental impacts associated with the City’s proposed Recycled Water Project (Proposed Project/Action). The purpose of the Proposed Project/Action is to replace/augment existing water supplies in Ukiah Valley. Recycled water use within the Ukiah Valley would offset existing and future water demands for irrigation and frost protection of agricultural land, and in doing so, would support the local agricultural industry. It would also offset urban irrigation demands, ease storage limitations at the Ukiah Wastewater Treatment Plant (UWWTP) and reduce treated wastewater discharges to the Russian River.

CEQA Guidelines require public agencies to adopt a Mitigation Monitoring and Reporting Program (MMRP) for changes to the project which it has adopted or made a condition of project approval in order to mitigate or avoid significant effects on the environment. A MMRP is required for the proposed project because the IS/MND identifies potentially significant adverse impacts related to project implementation, and mitigation measures have been identified to reduce those impacts.

On March 27, 2013, to initiate public review of the Draft IS/MND, the City filed a Notice of Completion (NOC) for the project with the Governor’s Office of Planning and Research (State Clearinghouse or SCH) and the County of Mendocino and released the Draft IS/MND for a 30-day public review. The State Clearinghouse identified the project with SCH #2013032072. The public review period was established between March 27 and April 26, 2013, with copies of the Draft IS/MND available for review at the City’s Public Works Administration Office, at 300 Seminary Avenue, Ukiah, CA 95482; and the Main Branch Library, 105 North Main Street, Ukiah, CA 95482. On March 27, 2013, the Ukiah Daily Journal published the Notice of Intent/Notice of Availability (NOI/NOA) to adopt a Mitigated Negative Declaration for the Proposed Project/Action. A Public Draft of the IS/MND was also posted on the City’s website at
http://www.cityofukiah.com/.

In May 2013, the City prepared a Final IS/MND according to CEQA Guidelines and incorporates all comments received by the State Clearinghouse and the City during the 30-day public review period. As a result, some of the mitigation measures identified in the Public Draft IS/MND have been revised to reflect those comments. Based on the Final IS/MND, the Proposed Project/Action would not result in new significant impacts, substantially increase the severity of previously disclosed impacts, or involve any of the other conditions related to changed circumstances or new information that can require a subsequent or supplemental EIR under Public Resources Code section 21166 and CEQA Guidelines section 15162 beyond those impacts and conditions already identified in the City’s Public Draft IS/MND.

PURPOSE OF MITIGATION MONITORING AND REPORTING

PROGRAM
This MMRP has been prepared to ensure that all required mitigation measures are implemented and completed in a satisfactory manner before and during project construction and operation. The MMRP may be modified by the City during project implementation, as necessary, in response to changing conditions or other refinements. Table A (included at the end of this document) has been prepared to assist the responsible parties in implementing the mitigation measures. The table identifies individual mitigation measures, monitoring/mitigation timing, responsible person/agency for implementing the measure, monitoring and reporting procedure, and space to confirm implementation of the mitigation measures.

The numbering of mitigation measures follows the numbering sequence found in the Public Draft IS/MND.

ROLES AND RESPONSIBILITIES
Unless otherwise specified herein, the City is responsible for taking all actions necessary to implement the mitigation measures under its jurisdiction according to the specifications provided for each measure and for demonstrating that the action has been successfully completed. The City, at its discretion, may delegate implementation responsibility or portions thereof to a licensed contractor or other designated agent. The City would be responsible for overall administration of the MMRP and for verifying that Appendix A-3 8660F10 July 12, 2023 - CONFORMED

Page 2399 of 3040 ends

Recycled Water Project City of Ukiah
Mitigation Monitoring and Reporting Program
3 City staff members and/or the construction contractor has completed the necessary actions for each measure.

The City would designate a project manager to oversee implementation of the MMRP. The City of Ukiah’s Public Works Department is primarily responsible for implementing the mitigation measures for the Proposed Project as described in this MMRP. Duties of the project manager include the following:
 Ensure that routine inspections of the construction site are conducted by appropriate City staff; check plans, reports, and other documents required by the MMRP; and conduct report activities.
 Serve as a liaison between the City and the contractor or project applicant regarding mitigation monitoring issues.
 Complete forms and maintain reports and other records and documents generated by the MMRP.
 Coordinate and ensure that corrective actions or enforcement measures are taken, if necessary.

The responsible party for implementation of each item would identify the staff members responsible for coordinating with the City on the MMRP.

REPORTING
The City’s project manager shall prepare a monitoring report, upon completion of the project, on the compliance of the activity with the required mitigation measures. Information regarding inspections and other requirements shall be compiled and explained in the report. The report shall be designed to simply and clearly identify whether mitigation measures have been adequately implemented. At a minimum, each report shall identify the mitigation measures or conditions to be monitored for implementation, whether compliance with the mitigation measures or conditions has occurred, the procedures used to assess compliance, and whether further action is required. The report shall be presented to the City Council.

MITIGATION MONITORING AND REPORTING PLAN TABLE
The categories identified in Table A are described below.  Mitigation Measure – This column provides the text of the mitigation measures identified in the IS/MND.
 Timing – This column identifies the time frame in which the mitigation will take place.
 Enforcement – This column identifies the party responsible for enforcing compliance with the requirements of the mitigation measure.
 Dated Signature for Verification of Compliance – This column is to be dated and signed by the person (either project manager or his/her designee) responsible for verifying compliance with the requirements of the mitigation measure.

Appendix A-4 8660F10 July 12, 2023 - CONFORMED

Page 2400 of 3040 ends

Recycled Water Project City of Ukiah
Mitigation Monitoring and Reporting Program
4 Table A
Mitigation Monitoring and Reporting Plan for the City of Ukiah’s Recycled Water Project IS/MND Mitigation Measure Timing Implementation1 Enforcement1
Dated Signature for
Verification of Compliance

3.3 AIR QUALITY
Mitigation Measure AIR-1: Dust Control. During all phases of construction, the following dust control procedures shall be implemented:
 Water all active construction sites as necessary.
 Cover all trucks having soil, sand, or other loose material or maintain at least two feet of freeboard on all trucks.
 Apply water as necessary, or apply non-toxic soil stabilizers on all unpaved access roads, parking areas and staging areas at construction sites.
 Sweep if visible soil material is carried into adjacent streets.  Water or apply non-toxic soil binders to exposed soil stockpiles.  Limit traffic speeds on unpaved areas to 15 mph.

Prior to
construction of
The Proposed
Project/Action.

City of Ukiah Public
Works Department
City of Ukiah Public Works
Department
Mendocino County Air
Quality Management District

3.4 BIOLOGICAL RESOURCES
Mitigation Measure BIO-1: Conduct Breeding/Nesting Surveys. For construction activities that occur between February 1 and August 31, preconstruction breeding bird surveys shall be conducted by a qualified biologist prior to and within 10 days of any initial ground-disturbance activities. Surveys shall be conducted within all suitable nesting habitat within 250 feet of the activity. All active, non-status passerine nests identified at that time should be protected by a 50 foot radius minimum exclusion zone. Active raptor or specialstatus species nests should be protected by a buffer with a minimum radius of 200 feet. CDFW and USFWS recommend that a minimum 500-foot exclusion buffer be established around active white-tailed kite and golden eagle nests. The following considerations apply to this mitigation measure:
 Survey results are valid for 14 days from the survey date. Should ground disturbance commence later than 14 days from the survey date, surveys should be repeated. If no breeding birds are encountered, then work may proceed as planned.
 Exclusion zone sizes may vary, depending on habitat characteristics and species, and are generally larger for raptors and colonial nesting birds. Each exclusion zone would remain in place until the nest is abandoned or all young have fledged.

Prior to and during
construction of the
Proposed
Project/Action.

City of Ukiah Public
Works Department
City of Ukiah Public Works
Department
California Department of Fish
and Wildlife
U.S. Fish and Wildlife
Service

1 The City of Ukiah’s Public Works Department is primarily responsible for implementing the mitigation measures for the Proposed Project/Action as described in this MMRP.

Appendix A-5 8660F10 July 12, 2023 - CONFORMED

Page 2401 of 3040 ends

Recycled Water Project City of Ukiah
Mitigation Monitoring and Reporting Program
5 Table A
Mitigation Monitoring and Reporting Plan for the City of Ukiah’s Recycled Water Project IS/MND Mitigation Measure Timing Implementation1 Enforcement1
Dated Signature for
Verification of Compliance
 The non-breeding season is defined as September 1 to January 31.

During this period, breeding is not occurring and surveys are not required. However, if nesting birds are encountered during work activities in the non-breeding season, disturbance activities within a minimum of 50 feet of the nest should be postponed until the nest is abandoned or young birds have fledged.

Mitigation Measure BIO-2: Conduct A Preconstruction Survey for Western Pond Turtles and Relocate, if Necessary. A qualified biologist shall conduct a pre-construction survey for western pond turtles no more than 30 days prior to construction in suitable aquatic habitats within the project corridor, including stream crossings, drainage ditches, and culverts. A combination of visual and trapping surveys may be performed with authorization from CDFW. If the species is found near any proposed construction areas, impacts on individuals and their habitat shall be avoided to the extent feasible. If occupied habitat can be avoided, an exclusion zone shall be established around the habitat and temporary plastic fencing shall be installed around the buffer area with “Sensitive Habitat Area” signs posted and clearly visible on the outside of the fence. If avoidance is not possible and the species is determined to be present in work areas, the biologist with approval from CDFW may capture turtles prior to construction activities and relocate them to nearby, suitable habitat a minimum of 300 feet downstream from the work area. Exclusion fencing should then be installed if feasible to prevent turtles from reentering the work area. For the duration of work in these areas the biologist should conduct monthly follow-up visits to monitor effectiveness.

Prior to and during
construction of the
Proposed
Project/Action.

City of Ukiah Public
Works Department
City of Ukiah Public Works
Department
California Department of Fish
and Wildlife
Mitigation Measure BIO-3: Avoid cutting through the creeks. As described in the Proposed Project/Action description, all of the creek crossings will be crossed by using trenchless construction techniques in the dry season.

Specifically, no pipeline construction activities shall occur between December 1 and May 31 (a work window identified by the National Marine Fisheries Service), which is the period when adult and juvenile salmonids are likely to occur in the Russian River. Construction crews shall avoid entering the stream channels during installation.

Prior to and during
construction of the
Proposed
Project/Action.

City of Ukiah Public
Works Department
City of Ukiah Public Works
Department
North Coast Regional Water
Quality Control Board
National Marine Fisheries
Service
Mitigation Measure BIO-4: Implement Construction Best Management Practices. To reduce potentially significant erosion and siltation, the City and/or its selected contractor(s) shall obtain a Stormwater Pollution Prevention Permit (SWPPP) and implement Best Management Practices and erosion control measures as required by the North Coast RWQCB. Best Management Practices to reduce erosion and siltation shall include, at a minimum, the following Prior to the
construction of
the Proposed
Project
City of Ukiah Public
Works Department
City of Ukiah Public Works
Department
North Coast Regional Water
Quality Control Board
Appendix A-6 8660F10 July 12, 2023 - CONFORMED

Page 2402 of 3040 ends

Recycled Water Project City of Ukiah
Mitigation Monitoring and Reporting Program
6 Table A
Mitigation Monitoring and Reporting Plan for the City of Ukiah’s Recycled Water Project IS/MND Mitigation Measure Timing Implementation1 Enforcement1
Dated Signature for
Verification of Compliance
measures: Avoidance of construction activities during inclement weather; limitation of construction access routes and stabilization of access points; stabilization of cleared, excavated areas by providing vegetative buffer strips, providing plastic coverings, and applying ground base on areas to be paved; protection of adjacent properties by installing sediment barriers or filters, or vegetative buffer strips; stabilization and prevention of sediments from surface runoff from discharging into storm drain outlets; use of sediment controls and filtration to remove sediment from water generated by dewatering; and returning all drainages to preconstruction conditions. Construction crews shall avoid entering the stream channels during installation.

Mitigation Measure BIO-5: Develop and Implement a Frac-Out Contingency Plan for Trenchless Construction Activities. For trenchless construction activities that use drilling lubricants, the City or its contractor shall prepare and implement a frac-out contingency plan that is intended to minimize the potential for a frac-out associated with tunneling activities; provide for the timely detection of frac-outs; and ensure an organized, timely, and “minimumimpact” response in the event of a frac-out and release of drilling lubricant (i.e., bentonite). The contingency plan will require, at a minimum, the following measures.
 Trenchless construction activities to be conducted during a work window identified by the National Marine Fisheries Service when adult and juvenile salmonids are not present in the project area (June 1 through November 30).
 A full-time monitor will attend all drilling to look for observable fracout conditions or lowered pressure readings on drilling equipment. If a frac-out is identified, all work will stop, including the recycling of drilling lubricant. In the event of a frac-out into water, the pressure of water above the tunnel will keep excess mud from escaping through the fracture. The location and extent of the frac-out will be determined, and the frac-out will be monitored for 4 hours to determine whether the drilling lubricant congeals (bentonite will usually harden, effectively sealing the frac-out location).
 If the drilling lubricant congeals, no other actions will be taken that would potentially suspend sediments in the water column.  Surface releases of bentonite will be allowed to harden and then will be removed.

Prior to and during
construction of the
Proposed
Project/Action.

City of Ukiah Public
Works Department
City of Ukiah Public Works
Department
Appendix A-7 8660F10 July 12, 2023 - CONFORMED

Page 2403 of 3040 ends

Recycled Water Project City of Ukiah
Mitigation Monitoring and Reporting Program
7 Table A
Mitigation Monitoring and Reporting Plan for the City of Ukiah’s Recycled Water Project IS/MND Mitigation Measure Timing Implementation1 Enforcement1
Dated Signature for
Verification of Compliance
 The contingency plan will identify additional measures to be taken to contain or remove the drilling lubricant if it does not congeal.

Mitigation Measure BIO-6: Obtain all Required Authorizations. Prior to issuance of encroachment permits for the Proposed Project/Action, the City, as necessary, shall conduct a wetlands delineation study in sensitive areas of the Proposed Project/Action and obtain all required authorization from agencies with jurisdiction riparian habitats and jurisdictional wetlands in the area. Such agencies may include, but are not limited to, the United States Army Corps of Engineers, the California Department of Fish and Wildlife, and the North Coast Regional Water Quality Control Board. Impacted habitat shall be offset through onsite restoration, offsite restoration, or purchase of credits at a CDFW and USFWS-approved mitigation bank in the region at no less than a 1:1 ratio.

Prior to and during
construction of the
Proposed
Project/Action.

City of Ukiah Public
Works Department
City of Ukiah Public Works
Department
North Coast Regional Water
Quality Control Board
California Department of Fish
and Wildlife
U.S. Fish and Wildlife
Service
U.S. Army Corps of
Engineers

3.5 CULTURAL RESOURCES
Mitigation Measure CR-1: Conduct Pre-construction Survey and Avoidance of Identified Cultural Resources. Prior to and/or during the engineering and final design phase, a qualified professional archeologist or cultural resources specialist will provide a final pre-construction survey of the exact proposed pipeline alignment and placement of the project facilities within the proposed construction corridor and ensure that the construction activities of the Proposed Project/Action will not affect the archeological resources P-23- 004814, P-23-004815, and P-23-003663 as identified by NWIC above. In the unlikely event that the Proposed Project/Action could affect these resources, the proposed project facilities shall be constructed in a manner that will avoid damaging these resources. Specifically, the pipeline shall either be installed by avoidance of the resource by realignment of the pipeline or facility around the resource(s) and/or as in the case of crossing the Northwestern Railroad, the resource shall be avoided by going beneath through the implementation of horizontal directional drilling (HDD) or another equally effective construction technique(s). In addition, the archeological resource sites shall include the installation of barrier fencing or other physical barriers to prevent construction personnel and vehicles from coming onto the sites during construction. During construction, the area shall be monitored by a professional archaeologist to ensure that (1) barrier fencing is maintained, (2) vehicles and workers do in fact remain off the site, and (3) violations of the exclusion area are reported and infractions are policed in accordance with treatment of other environmental violations. Any construction or post‐construction use of the road adjacent to the sites in support of the pipeline shall be confined to the road which shall be used Prior to and
throughout
construction
City of Ukiah Public
Works Department
City of Ukiah Public
Works Department
Appendix A-8 8660F10 July 12, 2023 - CONFORMED

Page 2404 of 3040 ends

Recycled Water Project City of Ukiah
Mitigation Monitoring and Reporting Program
8 Table A
Mitigation Monitoring and Reporting Plan for the City of Ukiah’s Recycled Water Project IS/MND Mitigation Measure Timing Implementation1 Enforcement1
Dated Signature for
Verification of Compliance
“as is” and shall not be modified by grading or expanded in width.

Mitigation Measure CR-2: Halt work if cultural resources are discovered.

In the event that any prehistoric or historic subsurface cultural resources are discovered during ground disturbing activities, all work within 100 feet of the resources shall be halted and after notification, the City shall consult with a qualified archaeologist to assess the significance of the find. If any find is determined to be significant (CEQA Guidelines 15064.5[a][3] or as unique archaeological resources per Section 21083.2 of the California Public Resources Code), representatives of the City and a qualified archaeologist shall meet to determine the appropriate course of action. In considering any suggested mitigation proposed by the consulting archaeologist in order to mitigate impacts to historical resources or unique archaeological resources, the lead agency shall determine whether avoidance is necessary and feasible in light of factors such as the nature of the find, project design, costs, and other considerations. If avoidance is infeasible, other appropriate measures (e.g., data recovery) shall be instituted. Work may proceed on other parts of the project site while mitigation for historical resources or unique archaeological resources is carried out.

Upon discovery of
cultural resources
City of Ukiah Public
Works Department
City of Ukiah Public Works
Department
Mitigation Measure CR-3: Stop work if paleontological remains are discovered. If paleontological resources, such as fossilized bone, teeth, shell, tracks, trails, casts, molds, or impressions are discovered during ground-disturbing activities, work will stop in that area and within 100 feet of the find until a qualified paleontologist can assess the significance of the find and, if necessary, develop appropriate treatment measures in consultation with the City.

Before and during
ground-disturbing
activities.

City of Ukiah Public
Works Department
City of Ukiah Public Works
Department
Mitigation Measure CR-4: Halt work if human remains are found. If human remains are encountered during excavation activities conducted for the Proposed Project/Action, all work in the adjacent area shall stop immediately and the Mendocino County Coroner’s office shall be notified. If the Coroner determines that the remains are Native American in origin, the Native American Heritage Commission shall be notified and will identify the Most Likely Descendent, who will be consulted for recommendations for treatment of the discovered human remains and any associated burial goods.

Upon the
discovery of
suspected human
remains.

City of Ukiah Public
Works Department
For actions taken to satisfy
the requirements of Section
106: the State Historic
Preservation Office (SHPO)
For all project-related
improvements that would be
located within the City of
Ukiah and County of
Mendocino: City of Ukiah
Public Works Department and
Mendocino County Coroner

3.6 GEOLOGY AND SOILS
Appendix A-9 8660F10 July 12, 2023 - CONFORMED

Page 2405 of 3040 ends

Recycled Water Project City of Ukiah
Mitigation Monitoring and Reporting Program
9 Table A
Mitigation Monitoring and Reporting Plan for the City of Ukiah’s Recycled Water Project IS/MND Mitigation Measure Timing Implementation1 Enforcement1
Dated Signature for
Verification of Compliance
Mitigation Measure GEO-1: Perform Geotechnical Investigation. The City shall require a design-level geotechnical study to be prepared prior to project implementation to determine proper design and construction methods, including any cathodic protection measures needed for installing the pipelines in these soils as well as the design of the storage pond(s). The geotechnical study shall evaluate the potential for impacts to groundwater by determining soil permability and other characteristics that affect water movement, in addition to issues related to erosion and seismic hazards.

Prior to
completion of
engineering plans
for the Proposed
Project/Action.

City of Ukiah Public
Works Department
City of Ukiah Public Works
Department

3.8 HAZARDS AND HAZARDOUS MATERIALS
Mitigation Measure HAZ-1: Store, Handle, Use Hazardous Materials in Accordance with Applicable Laws. The City shall ensure that all constructionrelated hazardous materials and hazardous wastes shall be stored, handled, and used in a manner consistent with relevant and applicable federal, state, and local laws and done in a manner that protects surface waters and groundwater. In addition, construction-related hazardous materials and hazardous wastes shall be staged and stored away from stream channels and steep banks to keep these materials a safe distance from near-by residents and prevent them from entering surface waters in the event of an accidental release. Additionally, the City shall develop a spill contingency plan that addresses measures to address spills and leaks of hazardous materials as well as appropriate use of adequate storage containers for containment.

Prior to
construction and
operation the
Proposed
Project/Action
City of Ukiah Public
Works Department
City of Ukiah Public Works
Department
Mitigation Measure HAZ-2: Properly Dispose of Contaminated Soil and/or Groundwater. If contaminated soil and/or groundwater is encountered or if suspected contaminated is encountered during project construction, work shall be halted in the area, and the type and extent of the contamination shall be identified. A contingency plan to dispose of any contaminated soil or groundwater will be developed through consultation with appropriate regulatory agencies.

Prior to
construction and
operation the
Proposed
Project/Action
City of Ukiah Public
Works Department
City of Ukiah Public Works
Department
Mitigation Measure HAZ-3: Properly Dispose of Hydrostatic Test Water.

Dewatering and of the pipeline during hydrostatic testing in the construction phase as well as any dewatering needed as a result of operations and maintenance activities shall be discharged to land and not into any creeks, drainages, or waterways and shall require prior approval from the North Coast Regional Water Quality Control Board.

Prior to
construction and
operation the
Proposed
Project/Action
City of Ukiah Public
Works Department
City of Ukiah Public Works
Department
Mitigation Measure HAZ-4: Consult with FAA, Ukiah Municipal Airport, USFWS, and CDFW. The City shall initiate consultation with the Ukiah Municipal Airport operations manager as well as with the FAA, USFWS, and CDFW to disclose plans for developing the new wastewater storage facility and Prior to
construction and
operation the
Proposed
City of Ukiah Public
Works Department
City of Ukiah Public Works
Department
Ukiah Municipal Airport
Appendix A-10 8660F10 July 12, 2023 - CONFORMED

Page 2406 of 3040 ends

Recycled Water Project City of Ukiah
Mitigation Monitoring and Reporting Program
10 Table A
Mitigation Monitoring and Reporting Plan for the City of Ukiah’s Recycled Water Project IS/MND Mitigation Measure Timing Implementation1 Enforcement1
Dated Signature for
Verification of Compliance
seek their input resulting in the development of a specific plan and/or management activities to avoid or reduce the potential for attracting hazardous wildlife movement into or across the approach or departure airspace.

Project/Action.

Federal Aviation
Administration
California Department of Fish
and Wildlife
U.S. Fish and Wildlife
Service
Mitigation Measure HAZ -5: Develop and Maintain Emergency Access Strategies. In conjunction with Mitigation Measure Traffic-1: Develop a Traffic Control Plan identified below in the Traffic and Transportation section, comprehensive strategies for maintaining emergency access shall be developed.

Strategies shall include, but not limited to, maintaining steel trench plates at the construction sites to restore access across open trenches and identification of alternate routing around construction zones. Also, police, fire, and other emergency service providers shall be notified of the timing, location, and duration of the construction activities and the location of detours and lane closures.

Prior to
construction and
operation the
Proposed
Project/Action.

City of Ukiah Public
Works Department
City of Ukiah Public Works
Department

3.9 HYDROLOGY AND WATER QUALITY
Mitigation Measure HWQ-1: Implement Construction Best Management Practices. To reduce potentially significant erosion and siltation, the City and/or its selected contractor(s) shall obtain a Stormwater Pollution Prevention Permit (SWPPP) and implement Best Management Practices and erosion control measures as required by the North Coast RWQCB. Best Management Practices to reduce erosion and siltation shall include the following measures: Avoidance of construction activities during inclement weather; limitation of construction access routes and stabilization of access points; stabilization of cleared, excavated areas by providing vegetative buffer strips, providing plastic coverings, and applying ground base on areas to be paved; protection of adjacent properties by installing sediment barriers or filters, or vegetative buffer strips; stabilization and prevention of sediments from surface runoff from discharging into storm drain outlets; use of sediment controls and filtration to remove sediment from water generated by dewatering; and returning all drainage patterns to pre-existing conditions.

Develop SWPPP
prior to and
throughout
construction.

City of Ukiah Public
Works Department
City of Ukiah Public Works
Department
North Coast Regional Water
Quality Control Board
Mitigation Measure HWQ-2: Implement Recycled Water Best Management Practices. In order to help reduce the potential effects of increased salt loading potential as a result of using recycled water, the City shall:

Ensure that water is applied consistent with Title 22 requirements and in amounts Incorporation
measures into
SWPPP prior to
construction and
implementation
City of Ukiah Public
Works Department
City of Ukiah Public Works
Department
North Coast Regional
Water Quality Control Board
Appendix A-11 8660F10 July 12, 2023 - CONFORMED

Page 2407 of 3040 ends

Recycled Water Project City of Ukiah
Mitigation Monitoring and Reporting Program
11 Table A
Mitigation Monitoring and Reporting Plan for the City of Ukiah’s Recycled Water Project IS/MND Mitigation Measure Timing Implementation1 Enforcement1
Dated Signature for
Verification of Compliance
(frequency and intensity) which meet the demands of the plant (agronomic rates), but not in excessive amounts such that salts buildup in the soil beyond the root zone and/or otherwise are leached to groundwater;
 Ensure that adequate soil drainage is maintained;
 Ensure that salt-sensitive plants are not to be spray wet; and  Addressing sodium and alkalinity concerns through addition of water and soil amendments, including addition of gypsum.

In addition and prior to operation of the recycled water system, the City shall prepare and submit for approval of the North Coast Regional Water Quality Control Board, a recycled water operations and maintenance plan and recycled water users guide to identify general and site-specific BMPs that will be implemented to ensure that recycled water will be used in a manner that protects ground and surface water. The BMPs shall address measures to protect against recycled water runoff that is not incidental, provide for detection and correction of leaks, and ensure that pollutants such as salts and nutrients are not discharged at concentrations that could adversely impact groundwater. The BMPs shall also address both agronomic irrigation and frost protection uses.

Specifically, the recycled water for irrigation BMPs shall include the type of irrigation system, proper design and operation of the irrigation system, application methods (e.g., agronomic application, use of repeat start times and multiple water days to increase irrigation efficiency and reduce runoff potential, no application during precipitation events), setbacks to surface waters, physical systems to capture runoff and prevent it from reaching surface waters. BMPs shall also describe how salts and nutrients will be managed in a manner that protects groundwater quality.

Frost protection BMPs shall include limiting frost protection use to relatively flat parcels, use of very low application rates for the shortest period possible, preseason system inspections and testing, regular in-season system checks, inspection checks during spray events that include checking for ponding and runoff, logging of spray events, and maintenance of a cover crop between vineyard rows to provide capacity for retention and limited treatment. throughout
construction,
as appropriate
Mitigation Measure HWQ-3: Prepare Antidegradation Analysis. Prior to implementation, the City shall prepare and submit to the North Coast Regional Water Board an antidegradation analysis as part of its Report of Waste Discharge that demonstrates that the storage and irrigation of recycled water will not result in degradation of groundwater or surface water. The analysis shall identify the fate and transport of pollutants of concern, and shall address salts, nutrients, and Development of
the Report of
Waste Discharge.

City of Ukiah Public
Works Department
City of Ukiah Public Works
Department
North Coast Regional
Water Quality Control Board
Appendix A-12 8660F10 July 12, 2023 - CONFORMED

Page 2408 of 3040 ends

Recycled Water Project City of Ukiah
Mitigation Monitoring and Reporting Program
12 Table A
Mitigation Monitoring and Reporting Plan for the City of Ukiah’s Recycled Water Project IS/MND Mitigation Measure Timing Implementation1 Enforcement1
Dated Signature for
Verification of Compliance
any other pollutants that could be present in the recycled water at concentrations that could affect groundwater quality. For the pond(s), the analysis shall determine the leakage rate through the pond liner and the impact of pond leakage on groundwater and nearby surface water. The analysis shall determine whether there are any anticipated increases in pollutant concentrations over background groundwater quality. If any potential degradation is identified, the analysis shall demonstrate that any degradation is in the best interest of the people of the state and that it will not result in the exceedance of any groundwater quality objectives. This antidegradation analysis shall be prepared and submitted as part of a Report of Waste Discharge.

3.12 NOISE
Mitigation Measure NOI-1: Limit Construction Hours. Construction activities will be limited to the least noise-sensitive times and will comply with both the City and Mendocino County noise ordinances. Construction, alteration, repair or land development activities shall be allowed on weekdays between the hours of 7 a.m. and 7 p.m., on Saturdays between the hours of 8 a.m. and 5 p.m.

No construction shall be permitted on Sundays.

Prior to and during
construction of the
Proposed
Project/Action.

City of Ukiah Public
Works Department
City of Ukiah Public Works
Department
Mitigation Measure NOI-2: Locate Staging Areas away from Sensitive Receptors. The City’s construction specification shall require that the contractor select staging areas as far as feasibly possible from sensitive receptors.

Prior to and during
construction of the
Proposed
Project/Action.

City of Ukiah Public
Works Department
City of Ukiah Public Works
Department
Mitigation Measure NOI-3: Maintain Mufflers on Equipment. The City’s construction specifications shall require the contractor to maintain all construction equipment with manufacturer’s specified noise-muffling devices.

Prior to and during
construction of the
Proposed
Project/Action.

City of Ukiah Public
Works Department
City of Ukiah Public Works
Department
Mitigation Measure NOI-4: Idling Prohibition and Enforcement. The City shall prohibit and enforce unnecessary idling of internal combustion engines. In practice, this would mean turning off equipment if it will not be used for five or more minutes.

Prior to and during
construction of the
Proposed
Project/Action.

City of Ukiah Public
Works Department
City of Ukiah Public Works
Department
Mitigation Measure NOI-5: Equipment Location and Shielding. The City shall require locating all stationary noise-generating construction equipment such as air compressors as far as possible from homes and businesses.

Prior to and during
construction of the
Proposed
Project/Action.

City of Ukiah Public
Works Department
City of Ukiah Public Works
Department

3.17 TRAFFIC AND TRANSPORTATION
Mitigation Measure TRA-1: Prepare and Implement Traffic Control Plan.

As is consistent with existing policy, the City shall require the contractor to Prior to and during
construction of the
Proposed
City of Ukiah Public
Works Department
City of Ukiah Public Works
Department
Appendix A-13 8660F10 July 12, 2023 - CONFORMED

Page 2409 of 3040 ends

Recycled Water Project City of Ukiah
Mitigation Monitoring and Reporting Program
13 Table A
Mitigation Monitoring and Reporting Plan for the City of Ukiah’s Recycled Water Project IS/MND Mitigation Measure Timing Implementation1 Enforcement1
Dated Signature for
Verification of Compliance
prepare and implement effective traffic control plans in the areas of City and County streets to show specific methods for maintaining traffic flows. Examples of traffic control measures to be considered include: 1) use of flaggers to maintain alternating one-way traffic while working on one-half of the street; 2) use of advance construction signs and other public notices to alert drivers of activity in the area; 3) use of “positive guidance” detour signing on alternate access streets to minimize inconvenience to the driving public; 4) provisions for emergency access and passage; and 5) designated areas for construction worker parking.

Project/Action.

Mitigation Measure TRA-2: Return Roads to Pre-construction Condition.

Following construction, the City shall ensure that road surfaces that are damaged during construction are returned to their pre-construction condition or better.

Prior to and during
construction of the
Proposed
Project/Action.

City of Ukiah Public
Works Department
City of Ukiah Public Works
Department
Appendix A-14 8660F10 July 12, 2023 - CONFORMED

Page 2410 of 3040 ends

APPENDIX B
WWTP GEOTECHNICAL REPORT (REVISION 2)

Page 2411 of 3040 ends
Page 2412 of 3040 ends

DRAFT GEOTECHNICAL REPORT (REVISION 2)
City of Ukiah Recycled Water Pipeline – Phase 4 Design Project Wastewater Treatment Plant Improvements
Ukiah, California
Prepared by:

Crawford & Associates, Inc.
1100 Corporate Way, Suite 230
Sacramento, CA 95831
February 2023
Prepared for:

Carollo Engineers, Inc.
2795 Mitchell Drive
Walnut Creek, CA 94598
Appendix B-1 8660F10 July 12, 2023 - CONFORMED

Page 2413 of 3040 ends

Appendix B-2 8660F10 July 12, 2023 - CONFORMED

Page 2414 of 3040 ends

Corporate Office: 4701 Freeport Boulevard, Sacramento, CA 95822 | (916) 455-4225 Modesto: 1165 Scenic Drive, Suite A, Modesto, CA 95350 | (209) 312-7668 Pleasanton: 6200 Stoneridge Mall Road, Suite 330, Pleasanton, CA 94588 | (925) 401-3515 Rocklin: 4220 Rocklin Road, Suite 1, Rocklin, CA 95677 | (916) 455-4225 Ukiah: 100 North Pine Street, Ukiah, CA 95482 | (707) 240-4400 File No. 19-503.1
February 3, 2022
Mr. Brian Avon, PE
Carollo Engineers, Inc.
2795 Mitchell Drive
Walnut Creek, CA 94598
Subject: DRAFT GEOTECHNICAL REPORT (Revision 2)
City of Ukiah Recycled Water Pipeline – Phase 4 Design Project Wastewater Treatment Plant (WWTP) Improvements
Ukiah, California
Dear Mr. Avon,
Crawford & Associates, Inc. (Crawford) is pleased to submit this DRAFT Geotechnical Report for the City of Ukiah Recycled Water Pipeline – Phase 4 Design Project in Ukiah, California.

Crawford prepared this report in accordance with our agreement dated August 16, 2022 addressing the basin, wet well, and electrical improvements at the WWTP. We will issue a final report based on your comments on this draft.

Thank you for selecting Crawford to be on your design team. Please call if you have questions or require additional information.

Sincerely,
Crawford & Associates, Inc,
Reviewed By,
Amando B. Castro, PE Benjamin Crawford, PE, GE
Project Engineer Principal
Johnathan Wright, PE, GE
Project Manager
Appendix B-3 8660F10 July 12, 2023 - CONFORMED

Page 2415 of 3040 ends

Appendix B-4 8660F10 July 12, 2023 - CONFORMED

Page 2416 of 3040 ends

DRAFT GEOTECHNICAL REPORT (Revision 2) Crawford
City of Ukiah Recycled Water Pipeline – Phase 4 Design Project File: 19-503.1 Ukiah, California February 3, 2023

TABLE OF CONTENTS
1 INTRODUCTION .............................................................................................................. 1

1.1 PURPOSE ............................................................................................................ 1

1.2 GEOTECHNICAL SERVICES.............................................................................. 1 2 PROJECT DESCRIPTION ............................................................................................... 1 3 SITE DESCRIPTION ........................................................................................................ 2 4 SITE GEOLOGY............................................................................................................... 3 5 SUBSURFACE CONDITIONS ......................................................................................... 3

5.1 FIELD EXPLORATION......................................................................................... 3

5.1.1 SOIL BORINGS......................................................................................... 3

5.1.2 DYNAMIC CONE PENETROMETER........................................................ 5

5.2 SUBSURFACE SOIL/ROCK................................................................................ 5

5.3 GROUNDWATER................................................................................................. 5 6 LABORATORY TESTS.................................................................................................... 7 7 CORROSION CONSIDERATIONS.................................................................................. 7 8 BASIN CONTENTS.......................................................................................................... 8 9 SEISMIC DESIGN PARAMETERS.................................................................................. 8

9.1 SURFACE FAULT RUPTURE ............................................................................. 9

9.2 LIQUEFACTION POTENTIAL AND SEISMICALLY INDUCED SETTLEMENT . 9 10 CONCLUSIONS AND RECOMMENDATIONS.............................................................. 10

10.1 GRADING........................................................................................................... 10

10.1.1 ORIGINAL GROUND & SUBGRADE PREPARATION ......................... 10

10.1.2 EXCAVATABILITY................................................................................. 10

10.1.3 OVEREXCAVATION ............................................................................. 10

10.1.4 FILL PLACEMENT & COMPACTION.................................................... 11

10.1.5 IMPORT FILL......................................................................................... 11

10.1.6 OVER-OPTIMUM SOIL MOISTURE ..................................................... 11

10.1.7 BENCHING............................................................................................ 11 BASIN................................................................................................................. 11

10.2................................................................................................................................. 11

10.2.1 FOUNDATION DESIGN PARAMETERS............................................... 12

10.2.2 BUOYANCY RESISTANCE................................................................... 12

10.3 WET WELL......................................................................................................... 12

10.3.1 FOUNDATION DESIGN PARAMETERS............................................... 12

10.3.2 BUOYANCY RESISTANCE................................................................... 13

10.3.3 LATERAL EARTH PRESSURES .......................................................... 13

10.4 CONSTRUCTION CONSIDERATIONS ............................................................. 14

10.4.1 SHORING/TEMPORARY SLOPES....................................................... 14

10.4.2 DEWATERING....................................................................................... 14 11 RISK MANAGEMENT.................................................................................................... 15 12 LIMITATIONS................................................................................................................. 15 Appendix B-5 8660F10 July 12, 2023 - CONFORMED

Page 2417 of 3040 ends

DRAFT GEOTECHNICAL REPORT (Revision 2) Crawford
City of Ukiah Recycled Water Pipeline – Phase 4 Design Project File: 19-503.1 Ukiah, California February 3, 2023

APPENDIX I
Figure 1 – Vicinity Map
Figure 2 – Exploration Location Map
Figure 3 – Geologic Map
Figure 4 – Fault Map

APPENDIX II
2022 Crawford Boring Legend and Logs
2017 Crawford Boring Logs
2014 LACO Boring Logs

APPENDIX III
Laboratory Test Results
Hazardous Materials Laboratory Results

APPENDIX IV
Site-Specific Ground Motion Hazard Analysis
Appendix B-6 8660F10 July 12, 2023 - CONFORMED

Page 2418 of 3040 ends

DRAFT GEOTECHNICAL REPORT (Revision 2) Crawford
City of Ukiah Recycled Water Pipeline – Phase 4 Design Project File: 19-503.1 Ukiah, California February 3, 2023
1 1 INTRODUCTION

1.1 PURPOSE
Crawford & Associates, Inc. (Crawford) prepared this Geotechnical Report for the City of Ukiah Wastewater Treatment Plant (WWTP) Improvements as part of the Recycled Water Pipeline – Phase 4 Design Project. This report is intended to provide geotechnical and geologic data and provide conclusions and recommendations addressing the planned basin, wet well, and electrical improvements at the WWTP.

1.2 GEOTECHNICAL SERVICES
To prepare this report, Crawford:
• Discussed the project with Jason Benson, PE, with the City of Ukiah, Alan Hodge with the City of Ukiah WWTP and Brian Avon, PE and Craig Andrews with Carollo Engineers (Carollo);
• Attended a kick-off meeting at the site to meet with the design team and Alan Hodge to discuss project needs and objectives;
• Reviewed historical geotechnical data in the LACO report “Ukiah Recycled Water Pipeline, Geotechnical Report” dated October 17, 2014.
• Reviewed historical geotechnical data in the Crawford Geotechnical Report “City of Ukiah Chlorine Contact Basin Expansion, Geotechnical Report” dated November 4, 2017. • Reviewed the Carollo 60% design submittal “Storage Pond Grading Plan” dated August 2022;
• Reviewed available geologic and seismic maps;
• Drilled and sample two test borings to a maximum depth of 31.5 feet (ft) below ground surface (bgs);
• Performed laboratory tests on representative soil samples from the exploratory borings; • Performed a site-specific ground motions hazard analysis; • Performed geotechnical engineering analysis for design and construction of the proposed concrete lined basin, pump station and electrical component improvements; and • Developed conclusions and recommendations.
2 PROJECT DESCRIPTION
The City of Ukiah WWTP plans to upgrade their wastewater treatment facility by demolishing two of their existing sludge basins that are currently not in use. Following demolition of the two sludge basins, the WWTP plans to construct a new lined basin covering the area of both existing basins. In addition, the project proposes to install a wet well and electrical equipment supported on a mat foundation.

Based on the Storage Pond Grading Plan (August 2022), we understand that the current planned finished grade for the bottom of the basin is at elevation 570 ft, however we understand this elevation is flexible. The plan sheet shows that one embankment will surround the new basin. The embankment crest elevation is 581 ft and will be 13 ft wide, and the embankment slopes will be 3 horizontal to 1 vertical (3H:1V) for the inner slopes and 3H:1V for the outer Appendix B-7 8660F10 July 12, 2023 - CONFORMED

Page 2419 of 3040 ends

DRAFT GEOTECHNICAL REPORT (Revision 2) Crawford
City of Ukiah Recycled Water Pipeline – Phase 4 Design Project File: 19-503.1 Ukiah, California February 3, 2023
2 slopes. We understand the new embankment will be constructed by generally adding new fill to the old embankment. The new inner slopes will extend into the existing basin and sludge area.

An access road leading inside the basin is planned along the east embankment, as well as around the crown of the basin. Two inlets are planned to be on the north and east inner slopes.

We understand the new wet well will be constructed at the center of the north embankment.

The wet well is planned to be 180 sq. ft. with a planned inlet elevation of 570 ft. The wet well is planned to be founded on a mat foundation. Additionally, a shallow mat foundation will likely support the electrical components of the wet well. The electric components are proposed to be located approximately 30 ft northeast of the basin next to an existing electric panel. The details of the electric components were not established at the time of this report. 3 SITE DESCRIPTION
The existing sludge basins are located within the City of Ukiah WWTP at 391 Plant Road in Ukiah, CA. The site coordinates used for the project site are approximate latitude 39.1117° and longitude -123.1900°. We understand that the two sludge basins were originally constructed in the 1950’s as one large basin, however a berm was later constructed in the center of the basin which separated the large basin into two basins (see Photo 1 below). The basins combined measure approximately 500 ft wide by 300 ft long.

The existing ground surface within the basins range from elevation 572 ft to 574 ft. The existing berm surrounding the two basins has a surface elevation of approximately 581 ft, and the existing center berm separating the two basins has a surface elevation of approximately 576 ft.

The basin neighbors the City of Ukiah WWTP’s percolation ponds to the east, recycled water storage ponds to the south, railroads tracks to the west, and the City of Ukiah WWTP to the north.

We provide a Vicinity Map shown on Figure 1 in Appendix I.

Appendix B-8 8660F10 July 12, 2023 - CONFORMED

Page 2420 of 3040 ends

DRAFT GEOTECHNICAL REPORT (Revision 2) Crawford
City of Ukiah Recycled Water Pipeline – Phase 4 Design Project File: 19-503.1 Ukiah, California February 3, 2023
3 Photo 1: Central Berm Showing Both Basins Facing South 4 SITE GEOLOGY
The project site lies within the Coast Ranges Geomorphic Province, characterized by a series of northwest trending mountain ranges sub-parallel to the San Andres Fault. The Coast Ranges is composed of thick Mesozoic and Cenozoic sedimentary strata. The northern Coast Ranges are dominated by the irregular, knobby, landslide-topography of the Franciscan Complex. The project site is located within the Ukiah Valley, an alluvial valley situated within the Coast Ranges.

The Geologic Map of California: Ukiah Sheet1 shows the site as being underlain by Quaternary (Recent) alluvium. The alluvium consists of predominately unconsolidated gravel, sand, silt, and clay deposited in channels and on floodplains of the Russian River (located adjacent to the facility property). Quaternary (Pleistocene) age non-marine terrace deposits are also mapped on site, which consist of gravelly clay to sandy/silty gravel.2

We provide a Geologic Map on Figure 3 in Appendix I.
5 SUBSURFACE CONDITIONS

5.1 FIELD EXPLORATION

5.1.1 SOIL BORINGS
Crawford retained Geo-Ex Subsurface Exploration to drill two exploratory borings on August 30, 2022 within the sludge basin, and Taber Drilling to drill two exploratory borings on September 27, 2017 for the nearby chlorine contact basin project. LACO retained Clear Heart Drillers to drill four borings within the existing basin embankments on September 11, 2014 for the Ukiah Recycled Water Project. Table 1 provides a subsurface exploration summary for the borings considered for this study.
1 Jennings, C.W. and Strand, R.G., (1960), Geologic Map of California: Ukiah Sheet 2 California Department of Water Resources (2004), Ukiah Valley Ground Water Basin, California groundwater Bulletin 118
Appendix B-9 8660F10 July 12, 2023 - CONFORMED

Page 2421 of 3040 ends

DRAFT GEOTECHNICAL REPORT (Revision 2) Crawford
City of Ukiah Recycled Water Pipeline – Phase 4 Design Project File: 19-503.1 Ukiah, California February 3, 2023
4 Table 1: Subsurface Exploration Summary
Boring
Number
Completion
Date
Drill Rig Type/
Drilling
Equipment
Type
Hammer
Type
Hammer
Efficiency
(%)
Approx.

Ground
Surface
Elevation (ft)
Boring
Depth
(ft)
Crawford Exploratory Borings (2022)
A-22-001 9/30/2022 D50(Track
Mounted) Auto 101.91 581 31.5
A-22-002 9/30/2022 576 26.5
DCP-22-
001 9/22/2022
N/A
35 lb
18-in
drop
N/A
573 10.0
DCP-22-
002 9/22/2022 573 9.6
Crawford Exploratory Borings (2017)
B1 9/27/2017 CME 55 (Truck
Mounted) Auto 822 --4 50.0
B2 9/27/2017 --4 26.5
LACO Exploratory Borings (2014)
B-15 9/11/2014
CME 75 (Track
Mounted) Auto N/A3
587 21.5
B-16 9/11/2014 586 21.5
B-17 9/11/2014 576 21.5
B-19 9/11/2014 588 21.5

1. A hammer energy calibration test was not performed specifically for this project/site; however, a previous hammer energy testing result provided by Geo-Ex found the hammer to have an energy efficiency of 101.9%.

2. A hammer energy calibration test was not performed specifically for this project/site; however, a previous hammer energy testing result provided by Taber Drilling found the hammer to have an energy efficiency of 82%.

3. A hammer energy calibration test was not recorded in the boring logs.

4. Elevations were not recorded at the time of the published report.

Soil samples were recovered by means of a 2.0-inch O.D. “Standard Penetration” split-spoon sampler without 1.4-inch stainless steel liners and a 3.0-inch O.D. “Modified California” splitspoon sampler with 2.4-inch stainless steel liners. Relatively undisturbed samples were also recovered by means of a 3-inch OD thin-walled Shelby sampler. The shelby samples were “pushed” in to recover sample and the “resistance” was measured (in psi). Drive samplers were advanced with standard 350 ft-lb striking force using a 140 lb. automatic hammer and a drop height of 30 inches. Sampler penetration resistance was recorded to provide a field measure of relative densities and can be correlated to soils strength and bearing characteristics.

Consistency of cohesive soils were obtained in the field by means of pocket penetrometer and field pocket torvanes. The field-recorded (uncorrected) blow counts and down pressure used to insert the Shelby tubes are shown on our 2022 boring logs in Appendix II. 2017 Crawford and 2014 LACO boring logs are attached in Appendix II. Boring locations are shown on the Exploration Map on Figure 2 in Appendix I.

Crawford’s project engineers and geologists logged the exploratory borings consistent with the Unified Soil Classification System (USCS) and the 2010 Caltrans Logging Manual. Crawford retained samples from the borings in sealed constrainers for laboratory testing and reference.

Groundwater observations were recorded during drilling operations when encountered. At Appendix B-10 8660F10 July 12, 2023 - CONFORMED

Page 2422 of 3040 ends

DRAFT GEOTECHNICAL REPORT (Revision 2) Crawford
City of Ukiah Recycled Water Pipeline – Phase 4 Design Project File: 19-503.1 Ukiah, California February 3, 2023
5 completion, the exploratory borings were backfilled following Mendocino County Environmental Health requirements.

5.1.2 DYNAMIC CONE PENETROMETER
The Dynamic Cone Penetrometer (DCP) test provides an approximate quantification of a material’s apparent density or stiffness. For this project, DCP testing was completed using manual equipment as described below. The purpose of the test was to aid in understanding the thickness of the soft/loose sludge sediments and soil, and the depth to more competent bearing materials within the existing basins.

Crawford project engineers completed a total of two DCP tests on September 22, 2022. The DCP tests were completed using a hand-operated tool called a “Wildcat DCP,” manufactured by Triggs Technology, Inc. The test consists of continuously driving a 1.4-inch O.D. steel cone tip attached to a lead rod until refusal (50 blows per approximately 4-inches) is reached. The rods are advanced using a hand-actuated, 35-lb safety drop hammer falling a distance of 15-inches.

5.2 SUBSURFACE SOIL/ROCK
The subsurface soils encountered in the 2022 borings are generally consistent with the materials encountered in the 2017 Crawford and 2014 LACO borings and published mapping for the site vicinity. We summarize the encountered materials as described below.

Sludge Basin – The explorations completed within the existing sludge basin and center berm indicate that very soft deleterious material (likely sludge) is present to an elevation of about 566.5 ft to 567.5 ft, or about 5.5 ft to 6.5 ft below existing basin grade.

Perimeter Berm – Embankment fill consisting of tan, medium dense, silty sand was encountered from berm grade (approximate elevation 581 ft) to elevation 576 ft. The embankment fill was underlain by soft to hard lean clay and loose to medium dense clayey sand, encountered between elevations 576 ft to 550 ft. Gravelly lean clay was encountered beneath this layer at elevation 550 ft. and based on nearby borings performed for the Chlorine Contact Basin Project, this layer extends to the maximum depth explored, likely between elevations3 520 ft and 530 ft.

We present more detailed descriptions of the subsurface soils on the boring logs in Appendix II.

5.3 GROUNDWATER
We encountered groundwater in boring A-22-001 at approximate elevation 560 ft (21 ft bgs) and we did not encounter groundwater in boring A-22-002. Our 2017 borings encountered groundwater at approximate elevations 572.2 ft and 563.6 ft for borings B1 and B2, respectively.

LACO encountered groundwater in their boring B-17 at an approximate elevation of 565 ft on September 11, 2014. Based on our conversations with the city, groundwater was not encountered at the time the Chlorine Contact Basin was constructed.

The WWTP staff provided historical groundwater elevations for two monitoring wells (GW-01 and GW-02) in the vicinity of the plant for the 2017 Chlorine Content Basin report. According to 3 Actual boring elevations were not recorded for the 2017 Crawford borings. Elevations were estimated from current topographic information provided by Carollo.

Appendix B-11 8660F10 July 12, 2023 - CONFORMED

Page 2423 of 3040 ends

DRAFT GEOTECHNICAL REPORT (Revision 2) Crawford
City of Ukiah Recycled Water Pipeline – Phase 4 Design Project File: 19-503.1 Ukiah, California February 3, 2023
6 WWTP staff, GW-1 and GW-2 were relocated from their previous location referenced in the 2017 report. The new locations for Monitoring wells GW-01 and GW-02 are located about 50 to 100 feet south and 1,500 to 1600 feet east of the southern embankment, respectively. To supplement the data from 2017, Table 2 below shows groundwater data previously measured, as well as recent groundwater measurements from the relocated monitoring wells.

Table 2: Summary of Subsurface Exploration
Date
2017 CCB Report 2023 Sludge Basin Report
GW-021 GW-012 GW-01 GW-02
Elevation3 Elevation4
Mar-04 554.22 564.23 N/A N/A
Oct-04 550.56 559.63 N/A N/A
Mar-05 559.05 564.22 N/A N/A
Oct-05 550.53 561.8 N/A N/A
Mar-06 556.1 565.24 N/A N/A
Oct-06 550.14 559.71 N/A N/A
Apr-07 553.64 563.58 N/A N/A
Oct-07 551.932 557.29 N/A N/A
Mar-08 555.9 563.87 N/A N/A
Oct-08 551.66 563.12 N/A N/A
Mar-09 554.8 554.18 N/A N/A
Oct-09 550.65 564.67 N/A N/A
Mar-10 555.25 557.57 N/A N/A
Oct-10 550.33 563.91 N/A N/A
Apr-11 550.72 557.07 N/A N/A
Oct-11 550.7 550.68 N/A N/A
Jul-12 N/A 565.27 N/A N/A
Aug-12 N/A 563.27 N/A N/A
May-21 N/A N/A 561.81 551.36
Feb-21 N/A N/A 564.11 561.52
Aug-21 N/A N/A 557.17 550.02
Oct-21 N/A N/A 561.97 563.96
Feb-22 N/A N/A 564.58 556.0
Jul-22 N/A N/A 559.78 550.63
May-22 N/A N/A 563.42 553.62
Oct-22 N/A N/A 557.94 551.77 1Formally MW-1, 2Formally MW-2 3Well elevations provided by the Rau & Associates, Inc. 2017 4 Elevations provided by City of Ukiah WWTP Appendix B-12 8660F10 July 12, 2023 - CONFORMED

Page 2424 of 3040 ends

DRAFT GEOTECHNICAL REPORT (Revision 2) Crawford
City of Ukiah Recycled Water Pipeline – Phase 4 Design Project File: 19-503.1 Ukiah, California February 3, 2023
7 Based on our understanding of the site conditions, flooding occurs throughout the winter months and the buoyancy forces should be estimated based on historical and/or expected high water events at the site. The recent groundwater data, from the WWTP, show the design groundwater elevation fluctuates between elevation 565 ft and 560 ft. 6 LABORATORY TESTS
The following laboratory tests were completed on representative soil samples obtained from the 2022 exploratory borings complete by Crawford:
• Grain Size Analysis (ASTM D6913)
• Moisture Content-Dry Density (ASTM D2216, ASTM D2937) • No. 200 Wash (ASTM D1140)
• Plasticity Index (ASTM D4318)
• pH and Minimum Resistivity (CTM 643)
• Redox Potential (ASTM G-200m)
• Sulfate Content (CTM 417)
• Sulfides (AWWA C105/A25.5)
• Unconfined Compression (ASTM D2166)
The following laboratory testing was completed on the soil/sludge samples obtained from the 2022 exploratory borings completed by Crawford:
• CAM 17 Heavy Metals (EPA 6010/7470)
• Purgeable Aromatics and Total Petroleum Hydrocarbons (EPA 8015) • Total Concentrations (TTLC)
• Volatile Organic Content (EPA 8260)
We present the laboratory test results in Appendix III. 7 CORROSION CONSIDERATIONS
A soils corrosivity analysis is important for estimating and mitigating the deterioration of buried ferrous metals and concrete. Soil corrosivity tests were completed on four samples obtained from the field exploration. Results of the soil corrosion tests are summarized in Table 4. Detailed laboratory results are included in Appendix III. Table 4 summarizes the results of soil corrosivity tests on samples from our test borings.

Table 3: Soil Corrosion Test Summary
BoringSample
Number
Depth
(ft)
Minimum
Resistivity
(Ohm-cm)
Soil
pH
Chloride
Content
(ppm)
Sulfate
Content
(ppm)
Redox
Potential
(mv)
Sulfides
Presence
A-22-001-3B 5.0 2,950 6.84 4.8 27.5 + 212 NEGATIVE
A-22-002-4A 6.0 1,470 7.05 15.3 31.6 N/A N/A
Appendix B-13 8660F10 July 12, 2023 - CONFORMED

Page 2425 of 3040 ends

DRAFT GEOTECHNICAL REPORT (Revision 2) Crawford
City of Ukiah Recycled Water Pipeline – Phase 4 Design Project File: 19-503.1 Ukiah, California February 3, 2023
8 To evaluate the potential for external corrosion potential on ductile iron pipe from soil, the 10- point system in C105/A21.5 (ANSI/AWWA 1999) was used. The 10-point system is a methodology used to determine the corrosive nature of a soil to ferrous metals based on the resistivity, pH, redox potential, sulfides presence, and drainage characteristics. The results of the 10-point system analysis showed a maximum of two points; which indicates a non-corrosive environment (AWWA 2005).

According to the American Concrete Institute (ACI) 318, a sulfate concentration less than 1,000 parts per million (ppm) is considered negligible. A chloride content of less than 600 ppm is generally non-corrosive to reinforced concrete.

Based on the results of tested samples, the soil may be generally characterized as “noncorrosive” to concrete and ferrous metals. The tests results are only an indicator of soil corrosivity and the designer should consult with a corrosion engineer if these values are considered significant.
8 BASIN CONTENTS
Soil samples were collected from the sludge basin on September 30, 2022, between elevations 567 ft to 565 ft (7.5 to 9.5 ft bgs) in boring A-22-002 (collected using a Shelby tube) and submitted to Pace Analytical (ELAP #2961) for preliminary analysis on October 25, 2022.

Samples were was analyzed for Volatile Organics (EPA Method 8260B), Purgeable Aromatics and Total Petroleum Hydrocarbons (EPA Method 8015B), and CAM 17 Metals (EPA Methods 6010B and 7471A). We summarize the results below and attach a copy of the Pace report in Appendix III.

Volatile Organics – Tetrachloroethene (0.011 milligrams/kilogram[mg/kg]), toluene (0.0051 mg/kg), and xylenes (0.0016 mg/kg) were reported in the sample; the laboratory noted that the sample was analyzed outside of hold time. These reported concentrations do not exceed applicable hazardous waste limits.

Purgeable Aromatics and Total Petroleum Hydrocarbons – Gasoline Range Organics were reported in this sample at a concentration of 0.78 mg/kg; the laboratory noted that the sample was analyzed outside of hold time. This reported concentration does not exceed applicable hazardous waste limits.

CAM 17 Metals – None of the reported metal concentrations exceeded their respective Total Threshold Limit Concentrations (TTLC), nor did any of the reported metals concentrations exceed ten times their respective Soluble Threshold Limit Concentration (STLC); further analysis of this sample for soluble concentrations is not warranted. Reported metals concentrations do not exceed applicable hazardous waste limits.

Based on the analytical data from the soil sample from boring A-22-002, it does not appear that concentrations of Volatile Organics, Purgeable Aromatics and Total Petroleum Hydrocarbons, or CAM 17 metals exceed applicable hazardous waste limits. The soil samples collected were not preserved and delivered within the specified time limit (‘hold time”). As a result, the above results are meant to be preliminary and proper testing and sampling should be performed during construction prior to excavation or disposal.
9 SEISMIC DESIGN PARAMETERS
Appendix B-14 8660F10 July 12, 2023 - CONFORMED

Page 2426 of 3040 ends

DRAFT GEOTECHNICAL REPORT (Revision 2) Crawford
City of Ukiah Recycled Water Pipeline – Phase 4 Design Project File: 19-503.1 Ukiah, California February 3, 2023
9 Crawford completed a site-specific ground motion hazard analysis in accordance with ASCE 7- 16 Section 11.4.8 and a summary of the seismic design parameters are presented in Table 5.

Table 4: Seismic Design Parameters
Design Parameter Value (g)
Design Spectral Acceleration for Short Period (SDS) 1.004 Design Spectral Acceleration for 1 sec Period (SD1) 0.959 MCE Spectral Response Acceleration for short Period (SMS) 1.506 MCE Spectral Response Acceleration Parameter for 1 sec Period (SM1) 1.438 See Appendix IV for the detailed site-specific ground motion hazard analysis.

9.1 SURFACE FAULT RUPTURE
No known active faults are mapped within or through the project area. The California Geologic Survey (CGS) considers a fault to be active if it has shown movement one or more times during the Holocene period, defined as the last 11,700 years. According to the CGS, the closest active fault is the Maacama Fault about 1.8 miles east of the site. Based on this mapping we consider the potential for fault rupture at the site low.

We present a fault activity map as Figure 4.

9.2 LIQUEFACTION POTENTIAL AND SEISMICALLY INDUCED SETTLEMENT Soil liquefaction can occur when saturated, relatively loose sand and specific soft, fine-grained saturated soils are subject to ground shaking strong enough to create soil particle separation that results from increased pore pressure. This separation and subsequent pore pressure dissipation can lead to decreased soil shear strength and settlement. Liquefaction is known to occur in soils ranging from low plasticity silts to gravels. However, soils most susceptible to liquefaction are clean sands to silty sands and non-plastic silts.

To evaluate the potential for soil liquefaction to occur at the site, Crawford used the simplified procedure outlined by Youd et al. (2001)4
, the 2022 and 2017 Crawford boring data, the 2014
LACO boring data, laboratory test results, design groundwater level of elevation 565 ft, and seismicity data from our site-specific hazards analysis summarized in Section 9 above and attached in Appendix IV.

The 2014 LACO borings were not deep enough to accurately perform liquefaction analysis, however the LACO borings indicate the potential for liquefaction is considered low due to primarily encountering clayey soils. Based on the soil conditions encountered in the 2017 Crawford borings, our analysis indicates a liquefaction potential index of 2.3 categorizing the site as low risk with a liquefaction induced settlement of less than 1 inch, within the silty sand layer located about 25 ft bgs at the chlorine contact basin location. However, this sand layer was not encountered in our 2022 Crawford borings. Therefore, this sand layer is likely discontinuous across the site. Based on the encountered soil conditions, we expect the potential 4 Youd & Idriss: Liquefaction Resistance of Soils: Summary Report from the 1996 NCEER and 1998 NCEER/NSF Workshops on Evaluation of Liquefaction Resistance of Soils, April 2001 Appendix B-15 8660F10 July 12, 2023 - CONFORMED

Page 2427 of 3040 ends

DRAFT GEOTECHNICAL REPORT (Revision 2) Crawford
City of Ukiah Recycled Water Pipeline – Phase 4 Design Project File: 19-503.1 Ukiah, California February 3, 2023
10 for liquefaction within the proposed sludge basin and wet well to be low but may still result in up to 1 inch of settlement.

LATERAL SPREADING AND seismic SLOPE inSTABILITY
Site topography is relatively flat, with predominately clayey soils, and the liquefaction potential is low therefore, we consider lateral spreading and seismic slope instability not to be a concern at this site.
10 CONCLUSIONS AND RECOMMENDATIONS
We conclude that the site is suitable from a Geotechnical standpoint for the proposed improvements. Key Geotechnical considerations include groundwater near the base of the basin excavation (which may cause difficult construction conditions), presence of soft deleterious materials (i.e. sludge) within the basin, and the presence of saturated soils.

10.1 GRADING
We understand that the WWTP is seeking design alternatives for both concrete liner and plastic liner systems. The grading recommendations below should provide adequate support for both liner alternatives. Excessively soft sediments should be prepared following the recommendations below, regardless of liner type selection.

10.1.1 ORIGINAL GROUND & SUBGRADE PREPARATION
Prior to site grading, clear the site to remove vegetation, debris, unneeded utilities, and other deleterious materials. Process and compact the exposed subgrade in new structure and/or fill areas as follows:
• Scarify the subgrade to a depth of approximately 10 inches. • Moisture condition subgrade soil to at least 2% over optimum moisture content and compact to a minimum 90% relative compaction per ASTM D1557.

We encountered saturated (saturation ranging between 90 to 99%) lean clays and clayey sands near the expected bottom of excavation which will likely require drying back. Should difficult construction conditions be encountered, we recommend alternative methods of subgrade preparation. Based on the expected size of exposed subgrade, chemical treatment is likely an economic option. Alternatively, the subgrade could be replaced with fabric wrapped crushed rock and/or aggregate base with and without geosynthetics and/or geogrids could potentially provide a stable working platform.

10.1.2 EXCAVATABILITY
Based on the data collected during this and previous exploration programs, soils should be excavatable with typical grading equipment such as backhoes, excavators, and scrapers.

10.1.3 OVEREXCAVATION
The DCP tests completed within the basin and borings within the embankments indicate very soft sludge sediments to about elevation 567 ft. To reduce settlement and to create a firm, unyielding surface, the soft sediments within the existing basin should be removed within the planned lined basin area. Within the proposed lined basin area, overexcavate the near surface Appendix B-16 8660F10 July 12, 2023 - CONFORMED

Page 2428 of 3040 ends

DRAFT GEOTECHNICAL REPORT (Revision 2) Crawford
City of Ukiah Recycled Water Pipeline – Phase 4 Design Project File: 19-503.1 Ukiah, California February 3, 2023
11 very soft sludge sediments to elevation5 566 ft. Extend overexcavation 5 ft laterally beyond the edge of the basin bottom, this will require some reworking of the existing embankment.

10.1.4 FILL PLACEMENT & COMPACTION
Place fill in maximum 8-inch-thick loose lifts, moisture condition to at least optimum moisture content and compact to a minimum 90% relative compaction per ASTM D1557. Native materials, minus organics, debris and other deleterious materials, are suitable for engineered fill if not exceeding a maximum particle size of 4 inches. Excavated materials unsuitable for use as structural fill can be placed outside the structure limits, or disposed off-site.

10.1.5 IMPORT FILL
Import fill should be free of deleterious debris and meet the following requirements:
• Plasticity Index of less than 15
• Organic content of less than 2%
• Sieve Size Percentage Passing
If imported soil is required for construction, Crawford must review and approve the soils for use prior to transport to the site.

10.1.6 OVER-OPTIMUM SOIL MOISTURE
Excessively over-optimum (wet) soil conditions can make proper compaction difficult or impossible. Due to the shallow groundwater at the site wet soil will likely be encountered during construction. In general, wet soil can be mitigated by:
• Discing the soil during prolonged periods of dry weather, • Overexcavating and replacing with drier material,
• Stabilizing using aggregate and/or stabilization fabric or grid.

Crawford should observe the conditions and provide more specific mitigation recommendations during construction.

10.1.7 BENCHING
Bench fill into the existing embankment at a minimum of one foot horizontally for every one foot of fill placed, or as necessary to remove loose material and provide proper compaction along the zone of transition.

10.2 BASIN
5 This elevation is estimated based on the provided topographic survey and limited subsurface exploration information. Crawford must observe the bottom of the excavation to confirm the presence of firm, unyielding native materials prior to placing fill, rebar or concrete.
3-inch 100
No. 4 35 - 100
No. 30 20 - 100
No. 200 10 – 45
Appendix B-17 8660F10 July 12, 2023 - CONFORMED

Page 2429 of 3040 ends

DRAFT GEOTECHNICAL REPORT (Revision 2) Crawford
City of Ukiah Recycled Water Pipeline – Phase 4 Design Project File: 19-503.1 Ukiah, California February 3, 2023
12 Based on our conversations with the City and Carollo, the planned finished grade for the bottom of the basin is elevation 570 ft. Our DCP tests completed within the existing basin area indicate the very soft sludge materials extend to about elevation 566.5 ft to 567.5 ft (about 5.5 to 6.5 ft bgs). To improve support and reduce settlement, the very soft sludge materials within the existing basin should be removed to about elevation 567 ft (See Section 10.1.3), and replaced with engineered fill or the basin bottom be lowered to achieve support within the more competent native soil below an elevation of 567 ft. Following the overexcavation of the very soft sludge sediments, the exposed subgrade at about elevation 567 ft should be scarified, moisture conditioned and compacted per Section 10.1. The designer should consider the potential for buoyancy forces when designing the bottom of the basin elevation.

10.2.1 FOUNDATION DESIGN PARAMETERS
Support for the proposed reconstructed sludge basin can achieve support for the foundation elements in compacted engineered fill or firm processed native soils below an elevation of 567 ft.

Use a modulus of subgrade reaction of 15 k/ft3 (corresponds to an allowable 1,250 psf for 1 inch of settlement). The proposed sludge basin is expected to settle on the order of 1 inch with a differential settlement of about ½ inch over a distance of about 50 ft. We expect this settlement to occur during construction.

Resistance to lateral loads (including those due to wind or seismic forces) may be determined using a coefficient of friction of 0.40 between the bottom of cast-in-place concrete foundations and the underlying soils. Lateral resistance for foundations is also available from passive soil pressure acting against the vertical face of the footings and the structure. The allowable passive pressures available may be taken as equivalent to pressures exerted by fluids weighing 220 psf per foot of embedment depth, up to a maximum of 2,000 psf. The passive pressure is only applicable if the retained earth is allowed to strain at least 0.02H.

These two modes of resistance can be combined; however, since horizontal movement is required to mobilize passive resistance, decrease the passive pressure by one-half if both friction and passive pressures are used.

Clean foundation excavations of debris and loose soil/rock prior to placing structural concrete.

Slope the ground surface away from the structures to direct surface water away from the facility.

10.2.2 BUOYANCY RESISTANCE
If buoyancy uplift will be a design consideration, buoyancy forces can be counter balanced using thickened slabs or pressure relief valves.

10.3 WET WELL

10.3.1 FOUNDATION DESIGN PARAMETERS
We understand that the wet well is planned to be supported on a mat foundation between elevations 567 ft to 568 ft. Based on information from our A-22-001 boring, loose clayey sand was encountered to an elevation of 568 ft. Provided the cast-in-place structure achieves uniform support within the underlying loose clayey sands at about elevation 568 ft, a modulus of subgrade reaction of 18 k/ft3 (corresponds to an allowable 1,500 psf for 1 inch of settlement) can Appendix B-18 8660F10 July 12, 2023 - CONFORMED

Page 2430 of 3040 ends

DRAFT GEOTECHNICAL REPORT (Revision 2) Crawford
City of Ukiah Recycled Water Pipeline – Phase 4 Design Project File: 19-503.1 Ukiah, California February 3, 2023
13 be used for design. Total and differential foundation settlement is expected to be less than 1 inch and ½ inch, respectively.

Lateral forces may be resisted by friction developed between the base of the footing and the underlying soil. Use a coefficient of friction of 0.45 for concrete cast against soil to resist sliding.

Additional lateral resistance may be provided by assuming a passive pressure based on an equivalent fluid weight of 270 pcf. The passive capacity reduces to an equivalent fluid weight of 150 pcf during a seismic event. In designing the structure to resist lateral loads, the upper 12 inches of soil should be ignored.

Clean foundation excavations of debris and loose soil/rock prior to placing structural concrete.

Slope the ground surface away from the structures to direct surface water away from the facility.

10.3.2 BUOYANCY RESISTANCE
We expect buoyancy uplift will not be a design consideration for the wet well. However, buoyancy forces can be counter balanced using thickened slabs or base extensions. If base extensions are used, uplift resistance is provided by the effective unit weight of the soil column directly above the base extension and wedge of soil extending outward and upward at a rate of 1:2 (H:V) from the edge of the base extension. Assuming an effective unit weight of 58 pcf for base extension uplift resistance below groundwater.

10.3.3 LATERAL EARTH PRESSURES
Use the equivalent fluid weights (EFWs) shown in the table below for design of permanent structures. We assume in-place native materials with level backfill conditions.

Table 5: Soil Equivalent Fluid Weights
Condition Groundwater
Condition
Static EFW
(pcf)
Additional
Seismic EFW
(pcf)
At-Rest Above
Groundwater
67 30
Active 46 20
At-Rest Below
Groundwater
34 15
Active 23 10
The EFW values above were calculated using an average unit weight of approximately 125 pcf (63 pcf below groundwater) and an angle of internal friction (𝝓) of 28°. Include full hydrostatic pressure (buoyant + hydrostatic) for walls designed to be in services below the water table.

For static design, apply the resultant of the static at-rest earth pressure at a depth of 0.33H from the base of the wall where H equals the wall height. The at-rest earth pressure does not include a factor of safety.

We estimate the EFW for seismic loading using the Mononabe-Okabe equation. Apply the additional seismic pressures separately at a depth 0.5H from the base of the wall, where H equals the wall height. For seismic design, reduce the allowable passive pressure from 270 pcf to 150 pcf. We provided a general pressure diagram below.

Appendix B-19 8660F10 July 12, 2023 - CONFORMED

Page 2431 of 3040 ends

DRAFT GEOTECHNICAL REPORT (Revision 2) Crawford
City of Ukiah Recycled Water Pipeline – Phase 4 Design Project File: 19-503.1 Ukiah, California February 3, 2023
14 For surcharge loads, apply an additional uniform lateral load behind the wall equivalent to the greater of 0.45-times the design surcharge pressure.

10.4 CONSTRUCTION CONSIDERATIONS

10.4.1 SHORING/TEMPORARY SLOPES
The contractor is responsible for the safety of all temporary excavations and must provide trench sloping and shoring design/construction in accordance with current CalOSHA requirements. In general, we encountered OSHA Type C soils at the site.

If temporary slopes are used in lieu of shoring, they must comply with OSHA standards.

10.4.2 DEWATERING
Based on the observed groundwater levels during our current and previous subsurface explorations and discussions with the WWTP personnel (see Section 5.3), groundwater was observed as high as elevation 565 ft. Therefore, groundwater may adversely affect the project Appendix B-20 8660F10 July 12, 2023 - CONFORMED

Page 2432 of 3040 ends

DRAFT GEOTECHNICAL REPORT (Revision 2) Crawford
City of Ukiah Recycled Water Pipeline – Phase 4 Design Project File: 19-503.1 Ukiah, California February 3, 2023
15 during construction. The contractor will be responsible for designing and implementing a dewatering system to meet the requirements of the project. Dewatering operations will need to draw the groundwater down to a minimum of 3 ft below the planned excavation during construction.
11 RISK MANAGEMENT
Our experience and that of our profession clearly indicates that the risks of costly design, construction, and maintenance problems can be significantly lowered by retaining the Geotechnical Engineer of Record to provide additional services during design and construction.

For this project, Crawford should be retained as the Geotechnical Engineer of Record to:
• Review and provide comments on the civil plans and specifications prior to construction. • Observe foundation excavations.
• Update this report if design changes occur, 2 years or more lapse between this report and construction, and/or site conditions have changed.

If Crawford is not retained to perform the above applicable services, we are not responsible for any other party’s interpretation of our report, and subsequent addendums, letters, and discussions.
12 LIMITATIONS
Crawford performed services in accordance with generally accepted geotechnical engineering principles and practices currently used in this area. Do not use this report for different locations and/or projects without the written consent of Crawford. Where referenced, we used ASTM or Caltrans standards as a general (not strict) guideline only.

Crawford based this report on the current site conditions. We assumed the soil and groundwater conditions are representative of the subsurface conditions on the site. Actual conditions between explorations and other data points could be different.

Our scope did not include evaluation of on-site hazardous materials.

Logs of our explorations are presented in Appendix A. The lines designating the interface between soil types are approximate. The transition between soil types may be abrupt or gradual. Our recommendations are based on the final logs, which represent our interpretation of the field logs and general knowledge of the site and geological conditions.

Modern design and construction are complex, with many regulatory sources/restrictions, involved parties, construction alternatives, etc. It is common to experience changes and delays.

The owner should set aside a reasonable contingency fund based on complexities and cost estimates to cover changes and delays.

Appendix B-21 8660F10 July 12, 2023 - CONFORMED

Page 2433 of 3040 ends

Appendix B-22 8660F10 July 12, 2023 - CONFORMED

Page 2434 of 3040 ends

DRAFT GEOTECHNICAL REPORT (Revision 2) Crawford
City of Ukiah Recycled Water Pipeline – Phase 4 Design Project File: 19-503.1 Ukiah, California February 3, 2023

APPENDIX I
Figure 1 – Vicinity Map
Figure 2 – Exploration Location Map
Figure 3 – Geologic Map
Figure 4 – Fault Map

Appendix B-23 8660F10 July 12, 2023 - CONFORMED

Page 2435 of 3040 ends

Appendix B-24 8660F10 July 12, 2023 - CONFORMED

Page 2436 of 3040 ends

PROJECT

LOCATION
Prj. No:

Date:

City of Ukiah Recycled Water
Pipeline - Phase 4 Design Project
Ukiah, CA 19-503.1 NORTH
0' 3,000'
1"=3,000'
Figure 1
Vicinity Map
Source:

USGS 7.5' Topographic Maps, Elledge Peak
Quadrangle, Mendocino County, California, 2021,
1:24,000.
11/09/2022
Appendix B-25 8660F10 July 12, 2023 - CONFORMED

Page 2437 of 3040 ends

Appendix B-26 8660F10 July 12, 2023 - CONFORMED

Page 2438 of 3040 ends

Prj. No:

Date:

City of Ukiah Recycled Water
Pipeline - Phase 4 Design Project
Ukiah, CA
19-503.1 NORTH
Legend
CRAWFORD 2022

BORING LOCATION
CRAWFORD 2022

DCP LOCATION
CRAWFORD 2017

BORING LOCATION
LACO 2014

BORING LOCATION
Figure 2
Exploration
Location
Map
Source:

Basemap: AutoCAD Civil3D Geolocation Tool, using
Bing Maps
Topographic Data: Topographic Data provided by
Carollo via electronic transfer on 10/31/22.
11/09/2022
1"=50'
0' 50'
A-22-001
A-22-002
DCP-22-001
DCP-22-002
B-15
B2
B1
B-17
B-16
B-19
Appendix B-27 8660F10 July 12, 2023 - CONFORMED

Page 2439 of 3040 ends

Appendix B-28 8660F10 July 12, 2023 - CONFORMED

Page 2440 of 3040 ends

Prj. No: Date: 19-503.1 NORTH City of Ukiah Recycled Water Pipeline - Phase 4 Design Project Ukiah, CA Qal Alluvium Qt Quaternary nonmarine terrace deposits QP Plio-Pleistocene nonmarine Qc Description K Undivided Cretaceous marine KJf Franciscan Formation KJfv Franciscan Volcanic and metavolcanic rocks PROJECT LOCATION Figure 3 Geologic Map Source: Charles W. Jennings, Rudolph G Strand; Geologic Map of California, Ukiah Sheet; Olaf P. Jenkins Edition; 1:250,000; State of California, Department of Natural Resources; 1992. 11/09/2022 0' 10,000' 1"=10,000' Appendix B-29 8660F10 July 12, 2023 - CONFORMED

Page 2441 of 3040 ends

Prj. No: Date: 19-503.1 NORTH City of Ukiah Recycled Water Pipeline - Phase 4 Design Project Ukiah, CA LEGEND Quaternary Fault (Age) <150 years <15,000 years <130,000 years <750,000 years <1.6 million years Location Well Constrained Moderately Constrained Inferred PROJECT LOCATION Figure 4 Fault Map Source: Basemap: National Geographic, Esri, Garmin, HERE, UNEP-WCMC, USGS, NASA, ESA, METI, NRCAN, GEBCO, NOAA, increment P Corp. Fault Data: USGS GIS Data 11/09/2022 1"=25,000' 0' 25,000' Maacama Fault Zone Unnamed Fault Clover Valley Fault Zone Bartlett Springs Fault System Wright Way Fault Collayomi Fault Zone Appendix B-30 8660F10 July 12, 2023 - CONFORMED

Page 2442 of 3040 ends

DRAFT GEOTECHNICAL REPORT (Revision 2) Crawford
City of Ukiah Recycled Water Pipeline – Phase 4 Design Project File: 19-503.1 Ukiah, California February 3, 2023

APPENDIX II
2022 Crawford Boring Legend and Logs
2017 Crawford Boring Logs
2014 LACO Boring Logs
Appendix B-31 8660F10 July 12, 2023 - CONFORMED

Page 2443 of 3040 ends

Appendix B-32 8660F10 July 12, 2023 - CONFORMED

Page 2444 of 3040 ends

C Consolidation
CL Collapse Potential
CP Compaction Curve
CR Corrosion, Sulfates, Chlorides
CU Consolidated Undrained Triaxial
DR Drained Residual Shear Strength
DS Direct Shear
EI Expansion Index
M Moisture Content
OC Organic Content
P Permeability
PA Particle Size Analysis
PI Liquid Limit, Plastic Limit, Plasticity Index
PL Point Load Index
PM Pressure Meter
PP Pocket Penetrometer
R R-Value
SE Sand Equivalent
SG Specific Gravity
SW Swell Potential
TV Pocket Torvane
UC Unconfined Compression - Soil
Unconfined Compression - Rock
UU Unconsolidated Undrained Triaxial
UW Unit Weight
Appendix B-33 8660F10 July 12, 2023 - CONFORMED

Page 2445 of 3040 ends

Appendix B-34 8660F10 July 12, 2023 - CONFORMED

Page 2446 of 3040 ends

FIELD

ELEVATION
(ft)
580
579
578
577
576
575
574
573
572
571
570
569
568
567
566
565
564
563
562
561
560
559
558
557
556
555
554
553
552
551
550
549
548
DEPTH (ft)
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30
31 32
33 SAMPLE

SAMPLE NO
Bulk
1 1
2 3
4 5
6 7
8 BLOWS
PER 6 IN.
9 7
9 3
5 12
8 5
12 7
7 3
8 16
9 6
16 6
2 4
12 20
12 10
BLOWS

PER FOOT
28 13
9 7
20 36
21 16
POCKET
PEN. (TSF)
+4.5
+4.5

4.00 1.50

GRAPHIC LOG

DESCRIPTION
SILTY SAND (SM); medium dense; tan/gray;
dry to moist; mostly fine SAND; little to some
low plasticity fines.

Lean CLAY with SAND (CL); hard; brown;
moist; mostly low plasticity fines; little fine
SAND.

CLAYEY SAND (SC); loose; gray; moist;
mostly fine SAND; some low plasticity fines.
moist to wet
medium dense; brown; moist
Lean CLAY (CL); very stiff; brown; moist;
mostly low plasticity fines; trace coarse to
fine SAND.

CLAYEY SAND with GRAVEL (SC); medium
dense; brown; wet; mostly coarse to fine
SAND; some low plasticity fines; few fine
GRAVEL.

Lean CLAY (CL); mostly low plasticity fines;
few fine SAND.

Bottom of borehole at 31.5 ft bgs
RECOVERY(%)
100
100
100
78 78
67 100
0 83
RQD (%)

LABORATORY

PLASTIC
LIMIT
20 23
19 LIQUID
LIMIT
31 38
28 MOISTURE
(%)

17.5 15.4

23.2 18.9
D. DENSITY
(PCF)
110.4
116.2
103.0
110.6
% PASSING
200 SIEVE
79 32
44 DRILL METHOD

CASING DEPTH

REMARKS
Embankment material
Corrosivity Analysis
Soil pH: 6.84
Min. Resistivity: 2,950
ohm-cm
Chloride: 4.8 ppm
Sulfate: 27.5 ppm
Redox Potential: (+) 212
mv
Sulfides Presence:

Negative
Tv = 1.34 tsf
Unconfined
Compressive Strength:
8050 psf
sand catcher
Tv = 0.875 tsf
little fine GRAVEL in
shoe
LOG OF BORING A-22-001
PROJECT NO: 19-503.1 BEGIN DATE: 09/30/2022 DRILLING CONTRACTOR: Geo-Ex Subsurface Exploration PROJECT: Ukiah Recycled Water Pipeline COMPLETION DATE: 09/30/2022 DRILLING METHOD: Solid-Stem Auger LOCATION: Ukiah, CA SURFACE ELEVATION: 581.0 (ft) DRILL RIG: D50 COUNTY: Mendocino SURFACE CONDITION: Soil HAMMER TYPE: Automatic; 140 (lbs); 30 (in) drop CLIENT: Carollo Engineers, Inc. WATER DEPTH: 21.0 ft SAMPLER TYPE & SIZE: MCAL (2.4" ID), SPT (1.4" ID), Bulk LOGGED BY: ABC READING TAKEN: 09/30/22 BOREHOLE DIAMETER: 4.0 (in) DEPTH OF BORING: 31.5 (ft) HAMMER EFFICIENCY: 101.9 (%) BACKFILL METHOD: Neat Cement Grout Crawford & Associates, Inc.
1100 Corporate Way, Suite 230
Sacramento, CA 95831
(916) 455-4225
PROJECT NO: 19-503.1
PROJECT: Ukiah Recycled Water Pipeline
BORING: A-22-001
ENTRY BY: OMR
CHECKED BY: ABC SHEET # 1 of 1
Appendix B-35 8660F10 July 12, 2023 - CONFORMED

Page 2447 of 3040 ends

FIELD

ELEVATION
(ft)
576
575
574
573
572
571
570
569
568
567
566
565
564
563
562
561
560
559
558
557
556
555
554
553
552
551
550
549
DEPTH (ft)
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
SAMPLE

SAMPLE NO
1 2
3 4
5 6
BLOWS
PER 6 IN.
8 3
4 3
7 8
9 5
6 12
13 8
BLOWS

PER FOOT
13 400 psi
250 psi
20 22
13 POCKET
PEN. (TSF)

0.25 1.00

0.50 3.50

3.50 2.00

GRAPHIC LOG

DESCRIPTION
SILTY SAND (SM); medium dense; brown;
moist; mostly fine SAND; few fines.

Lean CLAY (CL); soft; gray; moist; mostly
low plasticity to medium plasticity fines.
stiff
medium stiff
very stiff
Bottom of borehole at 26.5 ft bgs
RECOVERY(%)
67 100
100
83 83
39 RQD (%)

LABORATORY

PLASTIC
LIMIT
25 LIQUID
LIMIT
43 MOISTURE
(%)

21.0 24.0
D. DENSITY
(PCF)
103.7
102.9
% PASSING
200 SIEVE
96 92

DRILL METHOD

CASING DEPTH

REMARKS
rig chatter at 2.5'
Tv = 0.4 tsf
Corrosivity Analysis
Soil pH: 7.05
Min. Resistivity: 1,470
ohm-cm
Chloride: 15.3 ppm
Sulfate: 31.6 ppm
concrete in sampler;
moved 5' north
Tv = 0.55 tsf
Tv = 0.5 tsf
Tv = 1.5 tsf
Unconfined
Compressive Strength:
6912 psf
Tv = 1.5 tsf
Tv = 0.625 tsf
LOG OF BORING A-22-002
PROJECT NO: 19-503.1 BEGIN DATE: 09/30/2022 DRILLING CONTRACTOR: Geo-Ex Subsurface Exploration PROJECT: Ukiah Recycled Water Pipeline COMPLETION DATE: 09/30/2022 DRILLING METHOD: Hollow-Stem Auger LOCATION: Ukiah, CA SURFACE ELEVATION: 577.0 (ft) DRILL RIG: D50 COUNTY: Mendocino SURFACE CONDITION: Soil HAMMER TYPE: Automatic; 140 (lbs); 30 (in) drop CLIENT: Carollo Engineers, Inc. WATER DEPTH: Not Encountered SAMPLER TYPE & SIZE: MCAL (2.4" ID), SH LOGGED BY: ABC READING TAKEN: N/A BOREHOLE DIAMETER: 6.0 (in) DEPTH OF BORING: 26.5 (ft) HAMMER EFFICIENCY: 101.9 (%) BACKFILL METHOD: Neat Cement Grout Crawford & Associates, Inc.
1100 Corporate Way, Suite 230
Sacramento, CA 95831
(916) 455-4225
PROJECT NO: 19-503.1
PROJECT: Ukiah Recycled Water Pipeline
BORING: A-22-002
ENTRY BY: OMR
CHECKED BY: ABC SHEET # 1 of 1
Appendix B-36 8660F10 July 12, 2023 - CONFORMED

Page 2448 of 3040 ends





 










!"#$!#"%&"
'()% #(*)!)& +')$,-)+(&").%"

 +')$
,-)+(&").%"
 +')$

,/)0/+&-*1/))$2%"&&.%"&




3"(*/))&")/))&" '()% "
(+-".%"
 +')$,-)+(&").%"

+')$,/)0/+&-*.%"&
"+%4
4 !"#$!&.. !)/"#2(+*+%#
'()% !)& +')$,.%"
 +')$ ,
!"#$!0/+&-*1!"#$!)$2%"&&.%"&
(+-".%"
 +')$
,.%"
 +')$

,!"#$!0/+&-*1!"#$!)$2%"&&.%"&
"(*&.. +')$,.%"
 +')$ ,!"#$!
0/+&-*.%"& %)(+-"2(+3"/

/"+%4
4 !"#$!&.. !)/"#2(+*
+%#'()% !)& +')$
,.%"
 +')$

,-)+(&").%"
 +')$,!"#$!
0/+&-*1!"#$!)$2%"&&.%"&




!"#$!#"%&" '()% " +')$

,.%"
 +')$

,%)%0/+&-)/)
0/+&-*.%"&
















































("-
"+(506

46 0&.
7%-)%.%"#4)!0("&&3"

("%26
0&.



48485 +'"(
5 4


9

:
5 $)1

;/'1

;%-#()0


:
:
<
=
5 4

>
?8
98



5

%
?4@A

985 "+4"!"%()$("!"
?

5 BB
48 :
8
5 BB

7A4


85
.
  ?

7A4
4885
)/
9


AA4
45
,
:8C
45 7D+EE:44?"0/+-"!"%
4875
"%#)-%)
8
?5 @@
A



985
)/#;
"!$2"(1)+(*E+&
?88
:8C
485 ;


8485 7D+14

:98A?85 

.
4
5 4+()//)

@
5
E

:95
.






















 



























 






  !!


:8C
45 7D+EE:44?"0/+-"!"%
:8C
47
?
5 ;



?5 @@

9  ).
?85 ?
49 4@
?5
4(+.)(#<&&)-+"&1%-


4)(0)(+"E+*1
$"

+-(+!"%)14 



;









"

#
$
%

&
'
(
"!
""
"
"#
"$
"%
"
"&
"'
"(
!
"

#
$

5.5 (ft)
9/27/17
82 (%)
Appendix B-37 8660F10 July 12, 2023 - CONFORMED

Page 2449 of 3040 ends

16.5 SILTY SAND (SM) (continued).

Lean CLAY with SAND (CL); stiff; mottled brown and
gray; moist; about 15% coarse to fine GRAVEL;
about 15% fine SAND; about 70% medium plasticity,
medium toughness fines.

CLAYEY GRAVEL with SAND (GC); very dense;
brown; wet; about 60% coarse to fine GRAVEL; about
20% coarse to fine SAND; about 20% medium
plasticity fines.

Subangular to subrounded GRAVEL.

Bottom of borehole at 50.0 ft bgs
0 100
39 39
17 1.0 116.2
7 8
9 10
11 11
16 14
8 9
12 8
15 39
13 16
18 8
11 18
No sample recovery.

Chased with SPT sampler
to recover material with
about 67% recovery.

Sand catcher used,
sample disturbed.

Gravel chatter.

Sand catcher used,
sample disturbed.

Took a sample of the shoe
as the tubes looked like
sluff (Poorly graded
Gravel). Shoe was a clayey
gravel.

Loosing a lot of drilling
fluid.

Sand catcher used and
broke. Took a sample of
the shoe as the tubes
looked like sluff (Poorly
graded Gravel). Shoe was
a clayey gravel. Gravel
pieces were greater than 2
in.

The hole caved more than
2 ft.

The hole caved in 7 ft and
could not get sampler to
required depth.

FIELD LABORATORY
DEPTH ( ft)
PLASTICLIMITLIQUIDLIMITMOISTURE(%)

DESCRIPTION

ELEVATION
SAMPLESAMPLE NOPOCKETPEN. (TSF)GRAPHIC LOGRECOVERY(%)D. DENSITY(PCF) (ft)
BLOWSPER 6 IN.BLOWSPER FOOTRQD (%)DRILL METHODCASING DEPTH

REMARKS
% PASSING200 SIEVE
PROJECT: Ukiah WWTP CCB Replacement
PROJECT NUMBER: 17-414.1
ENTRY BY: KKL
SHEET 2 of 2
BORING: B1
CHECKED BY:

Crawford & Associates, Inc.
1100 Corporate Way, Suite 230
Sacramento, CA 95831
(916) 455-4225
30 21
54 34
29 26
27 28
29 30
31 32
33 34
35 36
37 38
39 40
41 42
43 44
45 46
47 48
49 50
51 52
53 54
55 Appendix B-38 8660F10 July 12, 2023 - CONFORMED

Page 2450 of 3040 ends



















!"#$!#"%&"
'()% #(*)!)& +')$,-)+(&").%"

 +')$
,-)+(&").%"
 +')$

,/)0/+&-*1/))$2%"&&.%"&
"+%4
4 +(# 2(+* !)& +')$
,
-)+(&").%"
 +')$
,.%"
 +')$

,!"#$!0/+&-*1!"#$!)$2%"&&.%"&
:))(/*2(+#"#



: /))&"
'()% !)& +')$,.%"
 +')$,
-)+(&").%"
 (+-"%)%0/+&-.%"&
"+%4
4 &.. '()%&2(+* !)& +')$

,.%"
 +')$
,!"#$!0/+&-*1
!"#$!)$2%"&&.%"&

)/"#'()%+%#2(+*
"(*&.. (+-".%"

9+(#

/"+%4
4 &.. !)/"#'()%+%#
("##&'()% !)&)" (+-".%"

+')$
,!"#$!).%"
 +')$
,
!"#$!0/+&-*1!"#$!)$2%"&&.%"&




!"#$!#"%&" '()% !)&)
" +')$
,.%"
 +')$
,%)%0/+&-
.%"&



















G









?$/D





















;+/$"6

096

%!$!"&&3*6
1
)!;-!
4/)(#"600!

$/.+"600!
7%-)%.%"#4)!0("&&3"

("%261 0&.

48485 +'"(
5 4


9

:
5 $)1

;/'1

;%-#()0


:
:
<
=
5 4

>
?8
98



5 
%
?4@A

985 "+4"!"%()$("!"
?

5 BB
48 :
8
5 BB

7A4


85
.
  ?

7A4
4885
)/
9


AA4
45
,
:8C
45 7D+EE:44?"0/+-"!"%
4875
"%#)-%)
8
?5 @@
A



985 9)//);
"!$2"(
?88
:8C
485 ;


8485 7D+14

:98A?85 
.
4
5 4+()//)

@
5
E

:95
.






















 



























 






  !!


:8C
45 7D+EE:44?"0/+-"!"%
:8C
47
?
5 ;



?5 @@

9  ).
?85 ?
49 4@
?5
4(+.)(#<&&)-+"&1%-


4)(0)(+"E+*1
$"

+-(+!"%)14 



;







"

#
$
%

&
'
(
"!
""
"
"#
"$
"%
"
"&
"'
"(
!
"

#
$
82 (%)
9/27/17
15 (ft)
Appendix B-39 8660F10 July 12, 2023 - CONFORMED

Page 2451 of 3040 ends

SILTY SAND (SM) (continued).

Lean CLAY (CL); stiff; brown; moist; trace fine
GRAVEL; about 5% fine SAND; about 95% medium
plasticity fines.

Bottom of borehole at 26.5 ft bgs
89 1.5
7 6
9 14

FIELD LABORATORY
DEPTH ( ft)
PLASTICLIMITLIQUIDLIMITMOISTURE(%)

DESCRIPTION

ELEVATION
SAMPLESAMPLE NOPOCKETPEN. (TSF)GRAPHIC LOGRECOVERY(%)D. DENSITY(PCF) (ft)
BLOWSPER 6 IN.BLOWSPER FOOTRQD (%)DRILL METHODCASING DEPTH

REMARKS
% PASSING200 SIEVE
PROJECT: Ukiah WWTP CCB Replacement
PROJECT NUMBER: 17-414.1
ENTRY BY: KKL
SHEET 2 of 2
BORING: B2
CHECKED BY:

Crawford & Associates, Inc.
1100 Corporate Way, Suite 230
Sacramento, CA 95831
(916) 455-4225
23 26
27 28
29 30
31 32
33 34
35 36
37 38
39 40
41 42
43 44
45 46
47 48
49 50
51 52
53 54
55 Appendix B-40 8660F10 July 12, 2023 - CONFORMED

Page 2452 of 3040 ends

WILDCAT DYNAMIC CONE LOG Page 1 of 1
Crawford & Associates, Inc.
1100 Corporate Way Suite 230 PROJECT NUMBER: 19-503.1
Sacramento, CA 95831 DATE STARTED: 09-22-2022
DATE COMPLETED: 09-22-2022
HOLE #: DCP-1 (Eastern Pond)
CREW: ABC/OMR SURFACE ELEVATION: 573
PROJECT: Ukiah WWTP Sludge Lagoon WATER ON COMPLETION: N/A ADDRESS: ( 39.111770°, -123.190679°) HAMMER WEIGHT: 35 lbs.

LOCATION: Ukiah, CA CONE AREA: 10 sq. cm

BLOWS RESISTANCE GRAPH OF CONE RESISTANCE TESTED CONSISTENCY DEPTH PER 10 cm Kg/cm² 0 50 100 150 N' NON-COHESIVE COHESIVE - 0 0.0 0 VERY LOOSE VERY SOFT
- 0 0.0 0 VERY LOOSE VERY SOFT
- 1 ft 0 0.0 0 VERY LOOSE VERY SOFT
- 0 0.0 0 VERY LOOSE VERY SOFT
- 0 0.0 0 VERY LOOSE VERY SOFT
- 2 ft 0 0.0 0 VERY LOOSE VERY SOFT
- 0 0.0 0 VERY LOOSE VERY SOFT
- 0 0.0 0 VERY LOOSE VERY SOFT
- 3 ft 0 0.0 0 VERY LOOSE VERY SOFT
- 1 m 0 0.0 0 VERY LOOSE VERY SOFT
- 0 0.0 0 VERY LOOSE VERY SOFT
- 4 ft 0 0.0 0 VERY LOOSE VERY SOFT
- 0 0.0 0 VERY LOOSE VERY SOFT
- 0 0.0 0 VERY LOOSE VERY SOFT
- 5 ft 0 0.0 0 VERY LOOSE VERY SOFT
- 0 0.0 0 VERY LOOSE VERY SOFT
- 0 0.0 0 VERY LOOSE VERY SOFT
- 6 ft 0 0.0 0 VERY LOOSE VERY SOFT
- 2 7.7 •• 2 VERY LOOSE SOFT
- 2 m 1 3.9 • 1 VERY LOOSE VERY SOFT
- 7 ft 14 47.9 ••••••••••••• 13 MEDIUM DENSE STIFF
- 23 78.7 •••••••••••••••••••••• 22 MEDIUM DENSE VERY STIFF - 14 47.9 ••••••••••••• 13 MEDIUM DENSE STIFF
- 8 ft 13 44.5 •••••••••••• 12 MEDIUM DENSE STIFF
- 10 34.2 ••••••••• 9 LOOSE STIFF
- 10 34.2 ••••••••• 9 LOOSE STIFF
- 9 ft 13 44.5 •••••••••••• 12 MEDIUM DENSE STIFF
- 13 44.5 •••••••••••• 12 MEDIUM DENSE STIFF
- 14 47.9 ••••••••••••• 13 MEDIUM DENSE STIFF
- 3 m 10 ft 15 51.3 •••••••••••••• 14 MEDIUM DENSE STIFF -
-
-
- 11 ft
-
-
- 12 ft
-
-
- 4 m 13 ft
19-503.1 Ukiah Recycled Water Pipeline
Appendix B-41 8660F10 July 12, 2023 - CONFORMED

Page 2453 of 3040 ends

WILDCAT DYNAMIC CONE LOG Page 1 of 1
Crawford & Associates, Inc.
1100 Corporate Way Suite 230 PROJECT NUMBER: 19-503.1
Sacramento, CA 95831 DATE STARTED: 09-22-2022
DATE COMPLETED: 09-22-2022
HOLE #: DCP-2 (Western Pond)
CREW: ABC/OMR SURFACE ELEVATION: 573
PROJECT: Ukiah WWTP Sludge Lagoon WATER ON COMPLETION: N/A ADDRESS: ( 39.111694°, -123.191467°) HAMMER WEIGHT: 35 lbs.

LOCATION: Ukiah, CA CONE AREA: 10 sq. cm

BLOWS RESISTANCE GRAPH OF CONE RESISTANCE TESTED CONSISTENCY DEPTH PER 10 cm Kg/cm² 0 50 100 150 N' NON-COHESIVE COHESIVE - 0 0.0 0 VERY LOOSE VERY SOFT
- 0 0.0 0 VERY LOOSE VERY SOFT
- 1 ft 0 0.0 0 VERY LOOSE VERY SOFT
- 0 0.0 0 VERY LOOSE VERY SOFT
- 0 0.0 0 VERY LOOSE VERY SOFT
- 2 ft 0 0.0 0 VERY LOOSE VERY SOFT
- 0 0.0 0 VERY LOOSE VERY SOFT
- 0 0.0 0 VERY LOOSE VERY SOFT
- 3 ft 0 0.0 0 VERY LOOSE VERY SOFT
- 1 m 0 0.0 0 VERY LOOSE VERY SOFT
- 0 0.0 0 VERY LOOSE VERY SOFT
- 4 ft 0 0.0 0 VERY LOOSE VERY SOFT
- 0 0.0 0 VERY LOOSE VERY SOFT
- 0 0.0 0 VERY LOOSE VERY SOFT
- 5 ft 0 0.0 0 VERY LOOSE VERY SOFT
- 0 0.0 0 VERY LOOSE VERY SOFT
- 3 11.6 ••• 3 VERY LOOSE SOFT
- 6 ft 8 30.9 •••••••• 8 LOOSE MEDIUM STIFF
- 14 54.0 ••••••••••••••• 15 MEDIUM DENSE STIFF
- 2 m 12 46.3 ••••••••••••• 13 MEDIUM DENSE STIFF
- 7 ft 9 30.8 •••••••• 8 LOOSE MEDIUM STIFF
- 9 30.8 •••••••• 8 LOOSE MEDIUM STIFF
- 14 47.9 ••••••••••••• 13 MEDIUM DENSE STIFF
- 8 ft 16 54.7 ••••••••••••••• 15 MEDIUM DENSE STIFF
- 16 54.7 ••••••••••••••• 15 MEDIUM DENSE STIFF
- 20 68.4 ••••••••••••••••••• 19 MEDIUM DENSE VERY STIFF - 9 ft 19 65.0 •••••••••••••••••• 18 MEDIUM DENSE VERY STIFF - 18 61.6 ••••••••••••••••• 17 MEDIUM DENSE VERY STIFF
-
- 3 m 10 ft
-
-
-
- 11 ft
-
-
- 12 ft
-
-
- 4 m 13 ft
19-503.1 Ukiah Recycled Water Pipeline
Appendix B-42 8660F10 July 12, 2023 - CONFORMED

Page 2454 of 3040 ends

579.5
574.5
565.5
SPT
B15-S1
SPT
B15-S2
MC
B15-S3
B15-S4
SPT
B15-S5
SPT
B15-S6
37 100
60 20-26-19
(45)
12-13-17
(30)
17-50
3-4-5
(9)
1-3-6
(9)
CL
GW
CH

7.5 12.5

21.5 (CL) Lean clay with sand (fill), dark to medium brown, fine sand, trace gravel, moist, low plasticity, hard.
(GW) Well graded gravel with sand, dark gray, trace fines, subangular to subrounded gravel, trace cobbles, moist, very dense.
(CH) Fat clay with sand, medium brown with dark gray mottling, fine sand, contains trace gravel, moist, stiff, medium to high plasticity. Light brown, saturated, and very sandy (fine to coarse) with no gravel below 17.5'.

Bottom of borehole at 21.5 feet.

LOGGED BY DAC
DRILLING METHOD Rotary Hollow Stem Auger
DRILLING CONTRACTOR Clear Heart Drilling GROUND WATER LEVELS:

CHECKED BY EAW
DATE STARTED 9/11/14 COMPLETED 9/11/14

AT END OF DRILLING ---
HOLE SIZE 6 inches

AT TIME OF DRILLING ---
GROUND ELEVATION 587 feet
NOTES Backfilled with neat cement grout ATD DEPTH (ft)
0 5
10 15
20 SAMPLE TYPE NUMBER
PROJECT NAME Ukiah Recycled Water
PROJECT LOCATION Ukiah, CA
CLIENT Carollo Engineers
PROJECT NUMBER 7986.00
PAGE 1 OF 1
BORING B-15 GENERAL BH / TP / WELL - GINT STD US LAB.GDT - 9/30/14 17:00 - P:\GINT FILES\PROJECTS\7986.00 UKIAH RECYCLED WATER.GPJ RECOVERY % BLOW COUNTS (N VALUE) U.S.C.S. GRAPHIC LOG

MATERIAL DESCRIPTION
Appendix B-43 8660F10 July 12, 2023 - CONFORMED

Page 2455 of 3040 ends

583.0
578.5
564.5
MC
B16-S1
MC
B16-S2
B16-S3
SPT
B16-S4
SPT
B16-S5
SPT
B16-S6
83 83
100
6-10-16
(26)
12-14-26
(40)
4-4-6
(10)
6-10-17
(27)
12-17-19
(36)
ML
CL
CL

3.0 7.5

21.5 (ML) Sandy silt (fill), medium brown, contains trace gravel, moist, very stiff. (CL) Sandy lean clay with gravel, medium brown with dark gray mottling, fine to coarse rounded to subrounded gravel, moist, low to medium plasticity, very stiff.

Plasticity Index: 7.7
Direct Shear: C = 2300 psf, Phi = 21.3 degrees
(CL) Lean clay with sand and gravel, dark gray with trace light gray mottling, moist, medium plasticity, stiff. Very stiff with trace gravel below 12.5'. Hard below 17.5'.

Bottom of borehole at 21.5 feet.

LOGGED BY DAC
DRILLING METHOD Rotary Hollow Stem Auger
DRILLING CONTRACTOR Clear Heart Drilling GROUND WATER LEVELS:

CHECKED BY EAW
DATE STARTED 9/12/14 COMPLETED 9/12/14

AT END OF DRILLING ---
HOLE SIZE 6 inches

AT TIME OF DRILLING ---
GROUND ELEVATION 586 feet
NOTES Backfilled with neat cement grout ATD DEPTH (ft)
0 5
10 15
20 SAMPLE TYPE NUMBER
PROJECT NAME Ukiah Recycled Water
PROJECT LOCATION Ukiah, CA
CLIENT Carollo Engineers
PROJECT NUMBER 7986.00
PAGE 1 OF 1
BORING B-16 GENERAL BH / TP / WELL - GINT STD US LAB.GDT - 9/30/14 17:00 - P:\GINT FILES\PROJECTS\7986.00 UKIAH RECYCLED WATER.GPJ RECOVERY % BLOW COUNTS (N VALUE) U.S.C.S. GRAPHIC LOG

MATERIAL DESCRIPTION
Appendix B-44 8660F10 July 12, 2023 - CONFORMED

Page 2456 of 3040 ends

568.5
563.5
554.5
MC
B17-S1
SPT
SPT
SPT
SPT
12-17-21
(38)
9-10-11
(21)
4-10-7
(17)
5-8-12
(20)
9-14-15
(29)
CL
CH
CL

7.5 12.5

21.5 (CL) Sandy lean clay with gravel (fill), medium brown, fine sand, fine to coarse subangular to subrounded gravel, moist, low plasticity, very stiff. Dark brown below 3'. Dark gray and stiff below

7.5'.
(CH) Fat clay with gravel (fill), dark gray with light gray and orange mottling, moist, medium plasticity, very stiff. Changes lighter brown 17.5'.
(CL) Lean clay, dark brown with dark gray and orange mottling, trace gravel, moist medium plasticity, very stiff.

Bottom of borehole at 21.5 feet.

LOGGED BY DAC
DRILLING METHOD Rotary Hollow Stem Auger
DRILLING CONTRACTOR Clear Heart Drilling GROUND WATER LEVELS:

CHECKED BY EAW
DATE STARTED 9/12/14 COMPLETED 9/12/14
AT END OF DRILLING 12.00 feet / Elevation 564.00 feet
HOLE SIZE 6 inches
AT TIME OF DRILLING 17.00 feet / Elevation 559.00 feet
GROUND ELEVATION 576 feet
NOTES Backfilled with neat cement grout ATD DEPTH (ft)
0 5
10 15
20 SAMPLE TYPE NUMBER
PROJECT NAME Ukiah Recycled Water
PROJECT LOCATION Ukiah, CA
CLIENT Carollo Engineers
PROJECT NUMBER 7986.00
PAGE 1 OF 1
BORING B-17 GENERAL BH / TP / WELL - GINT STD US LAB.GDT - 9/30/14 17:00 - P:\GINT FILES\PROJECTS\7986.00 UKIAH RECYCLED WATER.GPJ BLOW COUNTS (N VALUE) U.S.C.S. GRAPHIC LOG

MATERIAL DESCRIPTION
Appendix B-45 8660F10 July 12, 2023 - CONFORMED

Page 2457 of 3040 ends

585.0
566.5
MC
B19-S1
MC
B19-S2
B19-S3
SPT
B19-S4
SPT
B19-S5
SPT
B19-S6
30-22-24
(46)
18-20-28
(48)
3-3-8
(11)
4-9-14
(23)
10-12-14
(26)
CL
CL

3.0 21.5
(CL) Gravelly clay with sand (fill), dark brown to dark purple gray, fine sand, fine to coarse subangular to subround gravel, moist, very dense.
(CL) Lean clay with gravel and sand, medium brown to dark gray with orange mottling, fine to coarse subangular to subrounded gravel, moist, low plasticity, hard. Dark gray to black and stiff below 7.5'. Bluish gray between 12.5' and 15.75'. Sand is fine to coarse below 12.5'. Light to medium brown and very stiff with less gravel below 15.75'.

Plasticity Index: 7.5
Direct Shear: C = 2225 psf, Phi = 34.2 degrees
Bottom of borehole at 21.5 feet.

LOGGED BY DAC
DRILLING METHOD Rotary Hollow Stem Auger
DRILLING CONTRACTOR Clear Heart Drilling GROUND WATER LEVELS:

CHECKED BY EAW
DATE STARTED 9/11/14 COMPLETED 9/11/14

AT END OF DRILLING ---
HOLE SIZE 6 inches

AT TIME OF DRILLING ---
GROUND ELEVATION 588 feet
NOTES Backfilled with neat cement grout ATD DEPTH (ft)
0 5
10 15
20 SAMPLE TYPE NUMBER
PROJECT NAME Ukiah Recycled Water
PROJECT LOCATION Ukiah, CA
CLIENT Carollo Engineers
PROJECT NUMBER 7986.00
PAGE 1 OF 1
BORING B-19 GENERAL BH / TP / WELL - GINT STD US LAB.GDT - 9/30/14 17:00 - P:\GINT FILES\PROJECTS\7986.00 UKIAH RECYCLED WATER.GPJ BLOW COUNTS (N VALUE) U.S.C.S. GRAPHIC LOG

MATERIAL DESCRIPTION
Appendix B-46 8660F10 July 12, 2023 - CONFORMED

Page 2458 of 3040 ends

DRAFT GEOTECHNICAL REPORT (Revision 2) Crawford
City of Ukiah Recycled Water Pipeline – Phase 4 Design Project File: 19-503.1 Ukiah, California February 3, 2023

APPENDIX III
Laboratory Test Results
Hazardous Materials Laboratory Results
Appendix B-47 8660F10 July 12, 2023 - CONFORMED

Page 2459 of 3040 ends

Appendix B-48 8660F10 July 12, 2023 - CONFORMED

Page 2460 of 3040 ends

Project Name:

CAInc File No: 19-503.1
Date: 10/21/22
Technician: AC/LAD/KVL
1 2 3 4 5
USCS Symbol CL SC CL CL CL
Depth (ft.) 6 11 16 21 6
Sample Length (in.) 5.333 4.524 5.908 4.820 5.686
Diameter (in.) 2.399 2.398 2.399 2.393 2.394
Sample Volume (ft3) 0.01395 0.01182 0.01545 0.01255 0.01481 Total Mass Soil+Tube (g) 1100.1 993.0 1165.7 748.2 1121.3 Mass of Tube (g) 279.1 274.1 276.0 0.0 278.5
Tare No. B3 2036 G12 C15 B19
Tare (g) 13.7 124.2 13.4 13.7 13.6
Wet Soil + Tare (g) 66.0 459.9 72.1 61.5 61.3
Dry Soil + Tare (g) 58.2 415.0 61.0 53.9 53.0
Dry Soil (g) 44.5 290.8 47.7 40.2 39.4
Water (g) 7.8 44.9 11.1 7.6 8.3
Moisture (%) 17.5 15.4 23.2 18.9 21.0
Dry Density (pcf) 110.4 116.2 103.0 110.6 103.7
Notes:

City of Ukiah Recycled Water Pipeline - Phase 4 Design Project MOISTURE-DENSITY TESTS - D2216/D7263
Sample No. A-22-001-
3A
A-22-001-
4A
A-22-001-
5A
A-22-001-
6A
A-22-002-
1A
Appendix B-49 8660F10 July 12, 2023 - CONFORMED

Page 2461 of 3040 ends

Project Name:

CAInc File No: 19-503.1
Date: 10/21/22
Technician: AC/LAD/KVL
1 2 3 4 5
USCS Symbol CL CL
Depth (ft.) 10 16
Sample Length (in.) 6.494 5.620
Diameter (in.) 2.838 2.390
Sample Volume (ft3) 0.02376 0.01459
Total Mass Soil+Tube (g) 1800.0 844.8
Mass of Tube (g) 455.0 0.0
Tare No. G11 C7
Tare (g) 13.4 13.7
Wet Soil + Tare (g) 81.4 60.0
Dry Soil + Tare (g) 66.9 51.1
Dry Soil (g) 53.5 37.4
Water (g) 14.5 9.0
Moisture (%) 27.1 24.0
Dry Density (pcf) 98.2 102.9
Notes:

City of Ukiah Recycled Water Pipeline - Phase 4 Design Project MOISTURE-DENSITY TESTS - D2216/D7263
Sample No. A-22-002- 3 A-22-002-
4A
Appendix B-50 8660F10 July 12, 2023 - CONFORMED

Page 2462 of 3040 ends

Project Name: City of Ukiah Recycled Water Pipeline - Phase 4 Design Project CAInc File No: 19-503.1
Date: 10/31/22
Technician: CAP
Method A
Max Particle
Size (100%
Passing)
Standard Sieve
Size
Recommended
Min Mass of
Test
Specimens
2 mm or less No. 10 20 g

4.75 mm No. 4 100 g

9.5 mm 3/8 " 500 g

19.0 mm 3/4 " 2.5 kg

37.5 mm 1 1/2 " 10 kg

75.0 mm 3 " 50 kg
Sample No. A-22-001-2 A-22-001-4A A-22-001-7A A-22-002-4B A-22-002-6A USCS Symbol CL SC SC CL CL
Depth (ft.) 5 11 26 15.5 26
Tare No. 1016 2030 1002 3020 X21
Tare (g) 126.7 124.2 125.6 121.9 114.7
Dry Soil + Tare (g) 310 415 473.2 343.1 321.5
Dry Mass before (g) 183.3 290.8 347.6 221.2 206.8
Dry Mass after (g) 38.2 197.6 194.5 8.4 16.7
Percent Fines (%) 79 32 44 96 92
Notes:
200 Wash - ASTM D1140
Table from 6.2 of ASTM D1140
Appendix B-51 8660F10 July 12, 2023 - CONFORMED

Page 2463 of 3040 ends

City of Ukiah Recycled Water Pipeline
19-503.1
11/10/22
zzz
A-22-001-Bulk
Depth (ft): 0-2.5
% Fines
Coarse Fine Coarse Medium Fine Silt/Clay
7 7 4 6 19
0 57
Sieve # Opening Cummulative % Passing
mm Mass Retained (g) %
3" 75 0.0 100%
2" 50 0.0 100%
1-1/2" 37.5 0.0 100%
1" 25.0 54.7 94%
3/4" 19.0 65.5 93%
1/2" 12.5 80.7 92%
3/8" 9.50 90.0 91%
#4 4.75 131.6 86%
#10 2.00 171.3 82%
#20 0.825 205.8 79%
#40 0.425 234.9 76%
#60 0.250 271.5 72%
#100 0.150 329.3 66%
#200 0.075 422.4 57%
Cu = NA Cc = NA
Fine
Coefficient of Uniformity Coefficient of Curvature
Cobbles
Coarse
Gravel
Sand
Coarse
Fine
Medium
14 29
Silt/Clay
% Gravel % Sand
ASTM 6913 - Method A
Project Name:

Technician:
% Cobble
CAInc File No:

Date:

Sample ID:

USCS Classification: Sandy Silt (ML)
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
100 10 1 0.1 0.01
Percent Passing by Weight
Grain Size (mm)
Particle Size Distribution
Appendix B-52 8660F10 July 12, 2023 - CONFORMED

Page 2464 of 3040 ends

City of Ukiah Recycled Water Pipeline
19-503.1
11/10/22
zzz
A-22-002-1B
Depth (ft): 5.5
% Fines
Coarse Fine Coarse Medium Fine Silt/Clay
0 0 1 11 28
0 60
Sieve # Opening Cummulative % Passing
mm Mass Retained (g) %
3" 75 0.0 100%
2" 50 0.0 100%
1-1/2" 37.5 0.0 100%
1" 25.0 0.0 100%
3/4" 19.0 0.0 100%
1/2" 12.5 0.0 100%
3/8" 9.50 0.0 100%
#4 4.75 0.1 100%
#10 2.00 2.9 99%
#20 0.825 15.1 93%
#40 0.425 27.8 88%
#60 0.250 38.8 83%
#100 0.150 61.4 73%
#200 0.075 89.5 60%
Cu = NA Cc = NA
Sample ID:

USCS Classification: Sandy Silt (ML)
CAInc File No:

Date:
% Gravel % Sand
ASTM 6913 - Method A
Project Name:

Technician:
% Cobble
Fine
Coefficient of Uniformity Coefficient of Curvature
Cobbles
Coarse
Gravel
Sand
Coarse
Fine
Medium
0 40
Silt/Clay
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
100 10 1 0.1 0.01
Percent Passing by Weight
Grain Size (mm)
Particle Size Distribution
Appendix B-53 8660F10 July 12, 2023 - CONFORMED

Page 2465 of 3040 ends

Project Name: Ukiah WWTP Sludge Pond Sampled By: Client Project No. : 220328 (19-503.1) Date Sampled: 10/21/2022 Client: Crawford & Associates Sample: 2A
Lab Number: L223499 Depth: 5 - 7.5 ft.

Sample Description: CL

PLASTIC LIMIT LIQUID LIMIT
TEST NO. 1 2 1 2 3 4
Number of Blows [N] 32 25 18
Container No. A B C D E
Wet Wt. of Soil + Cont.(gm) 23.83 23.76 42.01 43.62 44.39 Dry Wt. of Soil + Cont. (gm) 23.33 23.27 37.06 38.15 38.60 Weight of Container (gm) 20.83 20.78 20.80 20.70 20.94
Weight of Water (gm) 0.50 0.49 4.95 5.47 5.79
Weight of Dry Soil (gm) 2.50 2.49 16.26 17.45 17.66
Moisture Content (%) [Wn] 20.0 19.7 30.4 31.3 32.8

PROCEDURES USED
Wet Preparation x
x Dry Preparation
31 20
Plasticity Index 12
PI at "A" - Line = 0.73(LL-20) =
One - Point Liquid Limit Calculation
LL =Wn(N/25)
Wt. Ret. #40
Wt. Total Smpl.
% Ret. #40
Plastic and Liquid Limits of Soils
Liquid Limit
Plastic Limit
USCS Classification
ASTM D4318
Procedure A Procedure B
(Single Point) (Multi-Point)

0.121

0.0 5.0

10.0 15.0

20.0 25.0

30.0 35.0

40.0 45.0

50.0 0 10 20 30
Moisture Content (%)
Number of Blows
Appendix B-54 8660F10 July 12, 2023 - CONFORMED

Page 2466 of 3040 ends

Project Name: Ukiah WWTP Sludge Pond Sampled By: Client Project No. : 220328 (19-503.1) Date Sampled: 10/21/2022 Client: Crawford & Associates Sample: 5A
Lab Number: L223499 Depth: 16 - 16.5 ft.

Sample Description: CL

PLASTIC LIMIT LIQUID LIMIT
TEST NO. 1 2 1 2 3 4
Number of Blows [N] 29 25 18
Container No. A B C D E
Wet Wt. of Soil + Cont.(gm) 23.80 23.75 47.05 47.79 48.82 Dry Wt. of Soil + Cont. (gm) 23.23 23.18 39.89 40.37 40.90 Weight of Container (gm) 20.72 20.64 20.63 20.69 20.84
Weight of Water (gm) 0.57 0.57 7.16 7.42 7.92
Weight of Dry Soil (gm) 2.51 2.54 19.26 19.68 20.06
Moisture Content (%) [Wn] 22.7 22.4 37.2 37.7 39.5

PROCEDURES USED
Wet Preparation x
x Dry Preparation
38 23
Plasticity Index 15
PI at "A" - Line = 0.73(LL-20) =
One - Point Liquid Limit Calculation
LL =Wn(N/25)
Wt. Ret. #40
Wt. Total Smpl.
% Ret. #40
Liquid Limit
Plastic Limit
USCS Classification
ASTM D4318
Procedure A Procedure B
(Single Point) (Multi-Point)
Plastic and Liquid Limits of Soils

0.121

0.0 5.0

10.0 15.0

20.0 25.0

30.0 35.0

40.0 45.0

50.0 0 10 20 30
Moisture Content (%)
Number of Blows
Appendix B-55 8660F10 July 12, 2023 - CONFORMED

Page 2467 of 3040 ends

Project Name: Ukiah WWTP Sludge Pond Sampled By: Client Project No. : 220328 (19-503.1) Date Sampled: 10/21/2022 Client: Crawford & Associates Sample: 8A
Lab Number: L223499 Depth: 30 - 31.5 ft.

Sample Description: CL

PLASTIC LIMIT LIQUID LIMIT
TEST NO. 1 2 1 2 3 4
Number of Blows [N] 31 23 19
Container No. A B C D E
Wet Wt. of Soil + Cont.(gm) 23.73 23.62 40.55 43.43 45.22 Dry Wt. of Soil + Cont. (gm) 23.27 23.15 36.30 38.43 39.69 Weight of Container (gm) 20.82 20.67 20.93 20.84 20.74
Weight of Water (gm) 0.46 0.47 4.25 5.00 5.53
Weight of Dry Soil (gm) 2.45 2.48 15.37 17.59 18.95
Moisture Content (%) [Wn] 18.8 19.0 27.7 28.4 29.2

PROCEDURES USED
Wet Preparation x
x Dry Preparation
28 19
Plasticity Index 9
PI at "A" - Line = 0.73(LL-20) =
One - Point Liquid Limit Calculation
LL =Wn(N/25)
Wt. Ret. #40
Wt. Total Smpl.
% Ret. #40
Liquid Limit
Plastic Limit
USCS Classification
ASTM D4318
Procedure A Procedure B
(Single Point) (Multi-Point)
Plastic and Liquid Limits of Soils

0.121

0.0 5.0

10.0 15.0

20.0 25.0

30.0 35.0

40.0 45.0

50.0 0 10 20 30
Moisture Content (%)
Number of Blows
Appendix B-56 8660F10 July 12, 2023 - CONFORMED

Page 2468 of 3040 ends

Project Name: Ukiah WWTP Sludge Pond Sampled By: Client Project No. : 220328 (19-503.1) Date Sampled: 10/21/2022 Client: Crawford & Associates Sample: 4A
Lab Number: L223499 Depth: 16 - 16.5 ft.

Sample Description: CL

PLASTIC LIMIT LIQUID LIMIT
TEST NO. 1 2 1 2 3 4
Number of Blows [N] 35 30 23
Container No. A B C D E
Wet Wt. of Soil + Cont.(gm) 23.54 23.54 37.02 42.48 48.51 Dry Wt. of Soil + Cont. (gm) 22.99 22.96 32.31 35.89 39.94 Weight of Container (gm) 20.70 20.65 20.69 20.49 20.80
Weight of Water (gm) 0.55 0.58 4.71 6.59 8.57
Weight of Dry Soil (gm) 2.29 2.31 11.62 15.40 19.14
Moisture Content (%) [Wn] 24.0 25.1 40.5 42.8 44.8

PROCEDURES USED
Wet Preparation x
x Dry Preparation
43 25
Plasticity Index 19
PI at "A" - Line = 0.73(LL-20) =
One - Point Liquid Limit Calculation
LL =Wn(N/25)
Wt. Ret. #40
Wt. Total Smpl.
% Ret. #40
Liquid Limit
Plastic Limit
USCS Classification
ASTM D4318
Procedure A Procedure B
(Single Point) (Multi-Point)
Plastic and Liquid Limits of Soils

0.121

0.0 5.0

10.0 15.0

20.0 25.0

30.0 35.0

40.0 45.0

50.0 0 10 20 30
Moisture Content (%)
Number of Blows
Appendix B-57 8660F10 July 12, 2023 - CONFORMED

Page 2469 of 3040 ends

Project Name:

CAInc File No: 19-503.1
Date: 10/21/22
Technician: LAD
Sample ID: A-22-001-6A Depth (ft): 21.0
USCS Classification: Lean Clay (CL)
Dry Density (pcf) 110.6
Water Content (%) 18.9
Unconfined Compressive
Strength (psi) 55.9
Unconfined Compressive
Strength (psf) 8050
Average Height (in) 4.820
Average Diameter (in) 2.393
Rate of strain (%) 0.7
Strain at Failure (%) 10.8
Notes:

City of Ukiah Recycled Water Pipeline - Phase 4 Design Project UNCONFINED COMPRESSION TEST - D2166

0.0 10.0

20.0 30.0

40.0 50.0

60.0 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0
Compressive Strength (psi)
Axial Strain (%)
Appendix B-58 8660F10 July 12, 2023 - CONFORMED

Page 2470 of 3040 ends

Project Name:

CAInc File No: 19-503.1
Date: 10/21/22
Technician: LAD
Sample ID: A-22-002-4A Depth (ft): 16.0
USCS Classification: Lean Clay (CL)
Dry Density (pcf) 102.9
Water Content (%) 24.0
Unconfined Compressive
Strength (psi) 48.0
Unconfined Compressive
Strength (psf) 6912
Average Height (in) 5.620
Average Diameter (in) 2.390
Rate of strain (%) 0.7
Strain at Failure (%) 10.2
Notes:

City of Ukiah Recycled Water Pipeline - Phase 4 Design Project UNCONFINED COMPRESSION TEST - D2166

0.0 10.0

20.0 30.0

40.0 50.0

60.0 0.0 2.0 4.0 6.0 8.0 10.0 12.0
Compressive Strength (psi)
Axial Strain (%)
Appendix B-59 8660F10 July 12, 2023 - CONFORMED

Page 2471 of 3040 ends

Appendix
Appendix B-60
B-60 8660F10
8660F10 July 12, 2023 - CONFORMED

Page 2472 of 3040 ends

Appendix
Appendix B-61
B-61 8660F10
8660F10 July 12, 2023 - CONFORMED

Page 2473 of 3040 ends

Summary of Chemical Analytical Data
Ukiah Recycled Water Pipeline - Phase 4 Design Project
Project 19-503.1
Sample ID: A-22-002-2
Date collected: 9/30/22
Date Analyzed: 10/25/22
Volatile Organics - EPA Method 8260B
Concentration
(mg/kg)
Tetrachloroethene 0.011
Toluene 0.0051
Xylenes 0.0016 J
Purgeable Aromatics and Total Petroleum Hydrocarbons (EPA Method 8015B) Concentration
(mg/kg)
GRO (C4-C12) 0.78 J
Metals - Total Concentrations (EPA Methods 6010,7471A)
Concentration TTLC STLC 10X STLC
(mg/kg) (mg/kg) (mg/l) (mg/l)
Antimony 7.8 J 500 15 150
Arsenic 5.7 J 50 5 50
Barium 410 10,000 100 1,000
Berylliuym <0.47 75 0.75 7.5
Cadmium 0.88 J 100 1 10
Chromium 47 2,500 5 50
Cobalt 5.2 J 8,000 80 800
Copper 280 2,500 25 250
Lead 26 1,000 5 50
Mercury 1.1 J 20 0.2 2
Molybdenum 0.8 3,500 350 3,500
Nickel 33 2,000 20 200
Selenium <9.8 100 1 10
Silver 13 500 5 50
Tahllium <6.4 700 7 70
Vanadiam 29 2,400 24 240
Zinc 1,300 5,000 250 2,500
Explanation
J - estimated value
mg/kg - milligram/kilogram
mg/l - milligram/liter
TTLC - Total Threshold Limit Concentration
STLC - Soluble Threshold Limit Concentration
Appendix B-62 8660F10 July 12, 2023 - CONFORMED

Page 2474 of 3040 ends

Date of Report: 11/03/2022
Armando Castro
Crawford & Associates, Inc.
4701 Freeport Blvd
Sacramento, CA 95822
Client Project: 19-503.1 WWTP Sludge Pod
BCL Project:

BCL Work Order:

Enclosed are the results of analyses for samples received by the laboratory on 10/26/2022. If you have any questions concerning this report, please feel free to contact me.

Invoice ID:
2225679
Sludge
B462077
Contact Person: Vanessa Sandoval
Sincerely,
Client Service Rep
Stuart Buttram
Operations Manager
Certifications: CA ELAP #1186; NV #CA00014; OR ELAP #4032-001; AK UST101 The results in this report apply to the samples analyzed in accordance with the chain of custody document . This analytical report must be reproduced in its entirety.

All results listed in this report are for the exclusive use of the submitting party. Pace Analytical assumes no responsibility for report alteration, separation, detachment or third party interpretation. 4100 Atlas Court Bakersfield, CA 93308 (661) 327-4911 FAX (661) 327-1918 www.pacelabs.com Report ID: 1001363273 Page 1 of 23 Appendix B-63 8660F10 July 12, 2023 - CONFORMED

Page 2475 of 3040 ends

Table of Contents
Sample Information
Chain of Custody and Cooler Receipt form.............................................................................................................................................. 3 Laboratory / Client Sample Cross Reference........................................................................................................................................... 6 Sample Results
2225679-01 - LEAN CLAY TRANSITION FROM SEWAGE SLUDGE
Volatile Organic Analysis (EPA Method 8260B)........................................................................................................................ 7 Purgeable Aromatics and Total Petroleum Hydrocarbons........................................................................................................ 10 Total Concentrations (TTLC)..................................................................................................................................................... 11 Quality Control Reports
Volatile Organic Analysis (EPA Method 8260B)
Method Blank Analysis.............................................................................................................................................................. 12 Laboratory Control Sample........................................................................................................................................................ 14 Precision and Accuracy.............................................................................................................................................................. 15 Purgeable Aromatics and Total Petroleum Hydrocarbons
Method Blank Analysis.............................................................................................................................................................. 16 Laboratory Control Sample........................................................................................................................................................ 17 Precision and Accuracy.............................................................................................................................................................. 18 Total Concentrations (TTLC)
Method Blank Analysis.............................................................................................................................................................. 19 Laboratory Control Sample........................................................................................................................................................ 20 Precision and Accuracy.............................................................................................................................................................. 21 Notes
Notes and Definitions................................................................................................................................................................ 23 The results in this report apply to the samples analyzed in accordance with the chain of custody document . This analytical report must be reproduced in its entirety.

All results listed in this report are for the exclusive use of the submitting party. Pace Analytical assumes no responsibility for report alteration, separation, detachment or third party interpretation. 4100 Atlas Court Bakersfield, CA 93308 (661) 327-4911 FAX (661) 327-1918 www.pacelabs.com Report ID: 1001363273 Page 2 of 23 Appendix B-64 8660F10 July 12, 2023 - CONFORMED

Page 2476 of 3040 ends

Chain of Custody and Cooler Receipt Form for 2225679 Page 1 of 3 The results in this report apply to the samples analyzed in accordance with the chain of custody document . This analytical report must be reproduced in its entirety.

All results listed in this report are for the exclusive use of the submitting party. Pace Analytical assumes no responsibility for report alteration, separation, detachment or third party interpretation. 4100 Atlas Court Bakersfield, CA 93308 (661) 327-4911 FAX (661) 327-1918 www.pacelabs.com Report ID: 1001363273 Page 3 of 23 Appendix B-65 8660F10 July 12, 2023 - CONFORMED

Page 2477 of 3040 ends

Chain of Custody and Cooler Receipt Form for 2225679 Page 2 of 3 The results in this report apply to the samples analyzed in accordance with the chain of custody document . This analytical report must be reproduced in its entirety.

All results listed in this report are for the exclusive use of the submitting party. Pace Analytical assumes no responsibility for report alteration, separation, detachment or third party interpretation. 4100 Atlas Court Bakersfield, CA 93308 (661) 327-4911 FAX (661) 327-1918 www.pacelabs.com Report ID: 1001363273 Page 4 of 23 Appendix B-66 8660F10 July 12, 2023 - CONFORMED

Page 2478 of 3040 ends

Chain of Custody and Cooler Receipt Form for 2225679 Page 3 of 3 The results in this report apply to the samples analyzed in accordance with the chain of custody document . This analytical report must be reproduced in its entirety.

All results listed in this report are for the exclusive use of the submitting party. Pace Analytical assumes no responsibility for report alteration, separation, detachment or third party interpretation. 4100 Atlas Court Bakersfield, CA 93308 (661) 327-4911 FAX (661) 327-1918 www.pacelabs.com Report ID: 1001363273 Page 5 of 23 Appendix B-67 8660F10 July 12, 2023 - CONFORMED

Page 2479 of 3040 ends

Crawford & Associates, Inc.
4701 Freeport Blvd
Sacramento, CA 95822
Project:

Project Number:

Project Manager:

Sludge
19-503.1 WWTP Sludge Pod
Armando Castro
Reported: 11/03/2022 15:30
Laboratory / Client Sample Cross Reference
Laboratory Client Sample Information
2225679-01
Sampling Point:

Sampling Location:

Project Number:

COC Number: ---
---
--- LEAN CLAY TRANSITION FROM SEWAGE SLUDGE
Receive Date:

Sampling Date:

Sample Depth:

Lab Matrix: --- 10/26/2022 09:49
09/30/2022 12:00
Solids
Sampled By: Shelby Tube Sample Type: Soil
The results in this report apply to the samples analyzed in accordance with the chain of custody document . This analytical report must be reproduced in its entirety.

All results listed in this report are for the exclusive use of the submitting party. Pace Analytical assumes no responsibility for report alteration, separation, detachment or third party interpretation. 4100 Atlas Court Bakersfield, CA 93308 (661) 327-4911 FAX (661) 327-1918 www.pacelabs.com Report ID: 1001363273 Page 6 of 23 Appendix B-68 8660F10 July 12, 2023 - CONFORMED

Page 2480 of 3040 ends

Crawford & Associates, Inc.
4701 Freeport Blvd
Sacramento, CA 95822
Project:

Project Number:

Project Manager:

Sludge
19-503.1 WWTP Sludge Pod
Armando Castro
Reported: 11/03/2022 15:30
BCL Sample ID: 2225679-01 Client Sample Name:

Constituent Result Units Method Bias Quals
MB Lab
Volatile Organic Analysis (EPA Method 8260B)
DCN
LEAN CLAY TRANSITION FROM SEWAGE SLUDGE, 9/30/2022 12:00:00PM, Shelby Tube

PQL MDL
Benzene ND mg/kg 0.0050 0.00067 EPA-8260B ND A26 1
Bromobenzene ND mg/kg 0.0050 0.00087 EPA-8260B ND A26 1 Bromochloromethane ND mg/kg 0.0050 0.00081 EPA-8260B ND A26 1 Bromodichloromethane ND mg/kg 0.0050 0.00078 EPA-8260B ND A26 1 Bromoform ND mg/kg 0.0050 0.00070 EPA-8260B ND A26 1
Bromomethane ND mg/kg 0.0050 0.0017 EPA-8260B ND A26 1
n-Butylbenzene ND mg/kg 0.0050 0.00076 EPA-8260B ND A26 1 sec-Butylbenzene ND mg/kg 0.0050 0.00071 EPA-8260B ND A26 1 tert-Butylbenzene ND mg/kg 0.0050 0.00085 EPA-8260B ND A26 1 Carbon tetrachloride ND mg/kg 0.0050 0.00078 EPA-8260B ND A26 1 Chlorobenzene ND mg/kg 0.0050 0.00077 EPA-8260B ND A26 1 Chloroethane ND mg/kg 0.0050 0.0011 EPA-8260B ND A26 1
Chloroform ND mg/kg 0.0050 0.00090 EPA-8260B ND A26 1
Chloromethane ND mg/kg 0.0050 0.0011 EPA-8260B ND A26 1 2-Chlorotoluene ND mg/kg 0.0050 0.00087 EPA-8260B ND A26 1 4-Chlorotoluene ND mg/kg 0.0050 0.00070 EPA-8260B ND A26 1 Dibromochloromethane ND mg/kg 0.0050 0.00080 EPA-8260B ND A26 1 1,2-Dibromo-3-chloropropane ND mg/kg 0.0050 0.00096 EPA-8260B ND A26 1 1,2-Dibromoethane ND mg/kg 0.0050 0.00082 EPA-8260B ND A26 1 Dibromomethane ND mg/kg 0.0050 0.0014 EPA-8260B ND A26 1 1,2-Dichlorobenzene ND mg/kg 0.0050 0.00079 EPA-8260B ND A26 1 1,3-Dichlorobenzene ND mg/kg 0.0050 0.00073 EPA-8260B ND A26 1 1,4-Dichlorobenzene ND mg/kg 0.0050 0.00073 EPA-8260B ND A26 1 Dichlorodifluoromethane ND mg/kg 0.0050 0.00079 EPA-8260B ND A26 1 1,1-Dichloroethane ND mg/kg 0.0050 0.00064 EPA-8260B ND A26 1 1,2-Dichloroethane ND mg/kg 0.0050 0.00073 EPA-8260B ND A26 1 1,1-Dichloroethene ND mg/kg 0.0050 0.0011 EPA-8260B ND A26 1 cis-1,2-Dichloroethene ND mg/kg 0.0050 0.00054 EPA-8260B ND A26 1 trans-1,2-Dichloroethene ND mg/kg 0.0050 0.0037 EPA-8260B ND A26 1 1,2-Dichloropropane ND mg/kg 0.0050 0.00080 EPA-8260B ND A26 1 1,3-Dichloropropane ND mg/kg 0.0050 0.00067 EPA-8260B ND A26 1 2,2-Dichloropropane ND mg/kg 0.0050 0.00067 EPA-8260B ND A26 1 1,1-Dichloropropene ND mg/kg 0.0050 0.00067 EPA-8260B ND A26 1 The results in this report apply to the samples analyzed in accordance with the chain of custody document . This analytical report must be reproduced in its entirety.

All results listed in this report are for the exclusive use of the submitting party. Pace Analytical assumes no responsibility for report alteration, separation, detachment or third party interpretation. 4100 Atlas Court Bakersfield, CA 93308 (661) 327-4911 FAX (661) 327-1918 www.pacelabs.com Report ID: 1001363273 Page 7 of 23 Appendix B-69 8660F10 July 12, 2023 - CONFORMED

Page 2481 of 3040 ends

Crawford & Associates, Inc.
4701 Freeport Blvd
Sacramento, CA 95822
Project:

Project Number:

Project Manager:

Sludge
19-503.1 WWTP Sludge Pod
Armando Castro
Reported: 11/03/2022 15:30
BCL Sample ID: 2225679-01 Client Sample Name:

Constituent Result Units Method Bias Quals
MB Lab
Volatile Organic Analysis (EPA Method 8260B)
DCN
LEAN CLAY TRANSITION FROM SEWAGE SLUDGE, 9/30/2022 12:00:00PM, Shelby Tube

PQL MDL
cis-1,3-Dichloropropene ND mg/kg 0.0050 0.00058 EPA-8260B ND A26 1 trans-1,3-Dichloropropene ND mg/kg 0.0050 0.00066 EPA-8260B ND A26 1 Ethylbenzene ND mg/kg 0.0050 0.00069 EPA-8260B ND A26 1 Hexachlorobutadiene ND mg/kg 0.0050 0.00067 EPA-8260B ND A26 1 Isopropylbenzene ND mg/kg 0.0050 0.00080 EPA-8260B ND A26 1 p-Isopropyltoluene ND mg/kg 0.0050 0.00059 EPA-8260B ND A26 1 Methylene chloride ND mg/kg 0.010 0.0011 EPA-8260B ND A26 1 Methyl t-butyl ether ND mg/kg 0.0050 0.00056 EPA-8260B ND A26 1 Naphthalene ND mg/kg 0.0050 0.00099 EPA-8260B ND A26 1
n-Propylbenzene ND mg/kg 0.0050 0.00071 EPA-8260B ND A26 1 Styrene ND mg/kg 0.0050 0.00062 EPA-8260B ND A26 1
1,1,1,2-Tetrachloroethane ND mg/kg 0.0050 0.00095 EPA-8260B ND A26 1 1,1,2,2-Tetrachloroethane ND mg/kg 0.0050 0.00084 EPA-8260B ND A26 1 Tetrachloroethene 0.011 mg/kg 0.0050 0.00097 EPA-8260B ND A26 1 Toluene 0.0051 mg/kg 0.0050 0.00069 EPA-8260B ND A26 1
1,2,3-Trichlorobenzene ND mg/kg 0.0050 0.0015 EPA-8260B ND A26 1 1,2,4-Trichlorobenzene ND mg/kg 0.0050 0.0014 EPA-8260B ND A26 1 1,1,1-Trichloroethane ND mg/kg 0.0050 0.00067 EPA-8260B ND A26 1 1,1,2-Trichloroethane ND mg/kg 0.0050 0.00094 EPA-8260B ND A26 1 Trichloroethene ND mg/kg 0.0050 0.00074 EPA-8260B ND A26 1 Trichlorofluoromethane ND mg/kg 0.0050 0.0015 EPA-8260B ND A26 1 1,2,3-Trichloropropane ND mg/kg 0.0050 0.0019 EPA-8260B ND A26 1 1,1,2-Trichloro-1,2,2-trifluoroethane ND mg/kg 0.0050 0.0010 EPA-8260B ND A26 1 1,2,4-Trimethylbenzene ND mg/kg 0.0050 0.00080 EPA-8260B ND A26 1 1,3,5-Trimethylbenzene ND mg/kg 0.0050 0.00066 EPA-8260B ND A26 1 Vinyl chloride ND mg/kg 0.0050 0.00059 EPA-8260B ND A26 1 Total Xylenes ND mg/kg 0.010 0.0025 EPA-8260B ND A26 1
p- & m-Xylenes 0.0016 mg/kg 0.0050 0.0015 EPA-8260B ND J,A26 1 o-Xylene ND mg/kg 0.0050 0.00093 EPA-8260B ND A26 1
1,2-Dichloroethane-d4 (Surrogate) 113 % 70 - 121 (LCL - UCL) EPA-8260B 1 Toluene-d8 (Surrogate) 88.0 % 81 - 117 (LCL - UCL) EPA-8260B 1 4-Bromofluorobenzene (Surrogate) 80.4 % 74 - 121 (LCL - UCL) EPA-8260B 1 The results in this report apply to the samples analyzed in accordance with the chain of custody document . This analytical report must be reproduced in its entirety.

All results listed in this report are for the exclusive use of the submitting party. Pace Analytical assumes no responsibility for report alteration, separation, detachment or third party interpretation. 4100 Atlas Court Bakersfield, CA 93308 (661) 327-4911 FAX (661) 327-1918 www.pacelabs.com Report ID: 1001363273 Page 8 of 23 Appendix B-70 8660F10 July 12, 2023 - CONFORMED

Page 2482 of 3040 ends

Crawford & Associates, Inc.
4701 Freeport Blvd
Sacramento, CA 95822
Project:

Project Number:

Project Manager:

Sludge
19-503.1 WWTP Sludge Pod
Armando Castro
Reported: 11/03/2022 15:30
BCL Sample ID: 2225679-01 Client Sample Name:

Method Prep Date Date/Time
Run
Analyst Instrument Dilution Batch ID
QC
Volatile Organic Analysis (EPA Method 8260B)
DCN
LEAN CLAY TRANSITION FROM SEWAGE SLUDGE, 9/30/2022 12:00:00PM, Shelby Tube 1 EPA-8260B 10/27/22 11:30 10/27/22 17:34 EAB MS-V17 1 B152390 EPA 5030 Soil MS DCN = Data Continuation Number
The results in this report apply to the samples analyzed in accordance with the chain of custody document . This analytical report must be reproduced in its entirety.

All results listed in this report are for the exclusive use of the submitting party. Pace Analytical assumes no responsibility for report alteration, separation, detachment or third party interpretation. 4100 Atlas Court Bakersfield, CA 93308 (661) 327-4911 FAX (661) 327-1918 www.pacelabs.com Report ID: 1001363273 Page 9 of 23 Appendix B-71 8660F10 July 12, 2023 - CONFORMED

Page 2483 of 3040 ends

Crawford & Associates, Inc.
4701 Freeport Blvd
Sacramento, CA 95822
Project:

Project Number:

Project Manager:

Sludge
19-503.1 WWTP Sludge Pod
Armando Castro
Reported: 11/03/2022 15:30
BCL Sample ID: 2225679-01 Client Sample Name:

Constituent Result Units Method Bias Quals
MB Lab
Purgeable Aromatics and Total Petroleum Hydrocarbons
DCN
LEAN CLAY TRANSITION FROM SEWAGE SLUDGE, 9/30/2022 12:00:00PM, Shelby Tube

PQL MDL
Gasoline Range Organics (C4 - C12) 0.78 mg/kg 1.0 0.20 EPA-8015B ND J,A26 1 a,a,a-Trifluorotoluene (FID Surrogate) 50.0 % 70 - 130 (LCL - UCL) EPA-8015B A20,S09 1 QC
Date/Time Analyst Instrument Dilution Batch ID
Run
DCN Method Prep Date Prep Method
1 EPA-8015B 10/27/22 08:37 10/27/22 12:36 SEM GC-V8 1 B152311 EPA 5030 Soil GC DCN = Data Continuation Number
The results in this report apply to the samples analyzed in accordance with the chain of custody document . This analytical report must be reproduced in its entirety.

All results listed in this report are for the exclusive use of the submitting party. Pace Analytical assumes no responsibility for report alteration, separation, detachment or third party interpretation. 4100 Atlas Court Bakersfield, CA 93308 (661) 327-4911 FAX (661) 327-1918 www.pacelabs.com Report ID: 1001363273 Page 10 of 23 Appendix B-72 8660F10 July 12, 2023 - CONFORMED

Page 2484 of 3040 ends

Crawford & Associates, Inc.
4701 Freeport Blvd
Sacramento, CA 95822
Project:

Project Number:

Project Manager:

Sludge
19-503.1 WWTP Sludge Pod
Armando Castro
Reported: 11/03/2022 15:30
BCL Sample ID: 2225679-01 Client Sample Name:

Constituent Result Units Method Bias Quals
MB Lab
Total Concentrations (TTLC)
DCN
LEAN CLAY TRANSITION FROM SEWAGE SLUDGE, 9/30/2022 12:00:00PM, Shelby Tube

PQL MDL
Antimony 7.8 mg/kg 50 3.3 EPA-6010B ND J,A10 1
Arsenic 5.7 mg/kg 10 4.0 EPA-6010B ND J,A10 1
Barium 410 mg/kg 5.0 1.8 EPA-6010B ND A10 1
Beryllium ND mg/kg 5.0 0.47 EPA-6010B ND A10 1
Cadmium 0.88 mg/kg 5.0 0.52 EPA-6010B ND J,A10 1
Chromium 47 mg/kg 5.0 0.50 EPA-6010B ND A10 1
Cobalt 5.2 mg/kg 25 0.98 EPA-6010B ND J,A10 1
Copper 280 mg/kg 10 0.50 EPA-6010B 2.5 A10 1
Lead 26 mg/kg 25 4.1 EPA-6010B ND A10 1
Mercury 1.1 mg/kg 0.16 0.016 EPA-7471A 0.061 S05 2
Molybdenum 0.80 mg/kg 25 0.50 EPA-6010B ND J,A10 1
Nickel 33 mg/kg 5.0 1.5 EPA-6010B 1.8 A10 1
Selenium ND mg/kg 10 9.8 EPA-6010B ND A10 1
Silver 13 mg/kg 5.0 0.67 EPA-6010B ND A10 1
Thallium ND mg/kg 50 6.4 EPA-6010B ND A10 1
Vanadium 29 mg/kg 5.0 1.1 EPA-6010B ND A10 1
Zinc 1300 mg/kg 25 0.87 EPA-6010B 5.0 A10 1
QC
Date/Time Analyst Instrument Dilution Batch ID
Run
DCN Method Prep Date Prep Method
1 EPA-6010B 11/01/22 19:25 11/02/22 11:33 JCC PE-OP3 9.259 B152776 EPA 3050B 2 EPA-7471A 11/03/22 08:05 11/03/22 10:16 TMT CETAC3 1.008 B152995 EPA 7471A DCN = Data Continuation Number
The results in this report apply to the samples analyzed in accordance with the chain of custody document . This analytical report must be reproduced in its entirety.

All results listed in this report are for the exclusive use of the submitting party. Pace Analytical assumes no responsibility for report alteration, separation, detachment or third party interpretation. 4100 Atlas Court Bakersfield, CA 93308 (661) 327-4911 FAX (661) 327-1918 www.pacelabs.com Report ID: 1001363273 Page 11 of 23 Appendix B-73 8660F10 July 12, 2023 - CONFORMED

Page 2485 of 3040 ends

Crawford & Associates, Inc.
4701 Freeport Blvd
Sacramento, CA 95822
Project:

Project Number:

Project Manager:

Sludge
19-503.1 WWTP Sludge Pod
Armando Castro
Reported: 11/03/2022 15:30
Quality Control Report - Method Blank Analysis
Constituent QC Sample ID MB Result Units Lab Quals
Volatile Organic Analysis (EPA Method 8260B)

PQL MDL
QC Batch ID: B152390
Benzene B152390-BLK1 ND mg/kg 0.0050 0.00067
Bromobenzene B152390-BLK1 ND mg/kg 0.0050 0.00087
Bromochloromethane B152390-BLK1 ND mg/kg 0.0050 0.00081 Bromodichloromethane B152390-BLK1 ND mg/kg 0.0050 0.00078 Bromoform B152390-BLK1 ND mg/kg 0.0050 0.00070
Bromomethane B152390-BLK1 ND mg/kg 0.0050 0.0017
n-Butylbenzene B152390-BLK1 ND mg/kg 0.0050 0.00076
sec-Butylbenzene B152390-BLK1 ND mg/kg 0.0050 0.00071
tert-Butylbenzene B152390-BLK1 ND mg/kg 0.0050 0.00085
Carbon tetrachloride B152390-BLK1 ND mg/kg 0.0050 0.00078 Chlorobenzene B152390-BLK1 ND mg/kg 0.0050 0.00077
Chloroethane B152390-BLK1 ND mg/kg 0.0050 0.0011
Chloroform B152390-BLK1 ND mg/kg 0.0050 0.00090
Chloromethane B152390-BLK1 ND mg/kg 0.0050 0.0011
2-Chlorotoluene B152390-BLK1 ND mg/kg 0.0050 0.00087
4-Chlorotoluene B152390-BLK1 ND mg/kg 0.0050 0.00070
Dibromochloromethane B152390-BLK1 ND mg/kg 0.0050 0.00080 1,2-Dibromo-3-chloropropane B152390-BLK1 ND mg/kg 0.0050 0.00096 1,2-Dibromoethane B152390-BLK1 ND mg/kg 0.0050 0.00082
Dibromomethane B152390-BLK1 ND mg/kg 0.0050 0.0014
1,2-Dichlorobenzene B152390-BLK1 ND mg/kg 0.0050 0.00079 1,3-Dichlorobenzene B152390-BLK1 ND mg/kg 0.0050 0.00073 1,4-Dichlorobenzene B152390-BLK1 ND mg/kg 0.0050 0.00073 Dichlorodifluoromethane B152390-BLK1 ND mg/kg 0.0050 0.00079 1,1-Dichloroethane B152390-BLK1 ND mg/kg 0.0050 0.00064 1,2-Dichloroethane B152390-BLK1 ND mg/kg 0.0050 0.00073 1,1-Dichloroethene B152390-BLK1 ND mg/kg 0.0050 0.0011
cis-1,2-Dichloroethene B152390-BLK1 ND mg/kg 0.0050 0.00054 trans-1,2-Dichloroethene B152390-BLK1 ND mg/kg 0.0050 0.0037 1,2-Dichloropropane B152390-BLK1 ND mg/kg 0.0050 0.00080 1,3-Dichloropropane B152390-BLK1 ND mg/kg 0.0050 0.00067 2,2-Dichloropropane B152390-BLK1 ND mg/kg 0.0050 0.00067 1,1-Dichloropropene B152390-BLK1 ND mg/kg 0.0050 0.00067 cis-1,3-Dichloropropene B152390-BLK1 ND mg/kg 0.0050 0.00058 The results in this report apply to the samples analyzed in accordance with the chain of custody document . This analytical report must be reproduced in its entirety.

All results listed in this report are for the exclusive use of the submitting party. Pace Analytical assumes no responsibility for report alteration, separation, detachment or third party interpretation. 4100 Atlas Court Bakersfield, CA 93308 (661) 327-4911 FAX (661) 327-1918 www.pacelabs.com Report ID: 1001363273 Page 12 of 23 Appendix B-74 8660F10 July 12, 2023 - CONFORMED

Page 2486 of 3040 ends

Crawford & Associates, Inc.
4701 Freeport Blvd
Sacramento, CA 95822
Project:

Project Number:

Project Manager:

Sludge
19-503.1 WWTP Sludge Pod
Armando Castro
Reported: 11/03/2022 15:30
Quality Control Report - Method Blank Analysis
Constituent QC Sample ID MB Result Units Lab Quals
Volatile Organic Analysis (EPA Method 8260B)

PQL MDL
QC Batch ID: B152390
trans-1,3-Dichloropropene B152390-BLK1 ND mg/kg 0.0050 0.00066 Ethylbenzene B152390-BLK1 ND mg/kg 0.0050 0.00069
Hexachlorobutadiene B152390-BLK1 ND mg/kg 0.0050 0.00067 Isopropylbenzene B152390-BLK1 ND mg/kg 0.0050 0.00080
p-Isopropyltoluene B152390-BLK1 ND mg/kg 0.0050 0.00059 Methylene chloride B152390-BLK1 ND mg/kg 0.010 0.0011
Methyl t-butyl ether B152390-BLK1 ND mg/kg 0.0050 0.00056 Naphthalene B152390-BLK1 ND mg/kg 0.0050 0.00099
n-Propylbenzene B152390-BLK1 ND mg/kg 0.0050 0.00071
Styrene B152390-BLK1 ND mg/kg 0.0050 0.00062
1,1,1,2-Tetrachloroethane B152390-BLK1 ND mg/kg 0.0050 0.00095 1,1,2,2-Tetrachloroethane B152390-BLK1 ND mg/kg 0.0050 0.00084 Tetrachloroethene B152390-BLK1 ND mg/kg 0.0050 0.00097
Toluene B152390-BLK1 ND mg/kg 0.0050 0.00069
1,2,3-Trichlorobenzene B152390-BLK1 ND mg/kg 0.0050 0.0015 1,2,4-Trichlorobenzene B152390-BLK1 ND mg/kg 0.0050 0.0014 1,1,1-Trichloroethane B152390-BLK1 ND mg/kg 0.0050 0.00067 1,1,2-Trichloroethane B152390-BLK1 ND mg/kg 0.0050 0.00094 Trichloroethene B152390-BLK1 ND mg/kg 0.0050 0.00074
Trichlorofluoromethane B152390-BLK1 ND mg/kg 0.0050 0.0015 1,2,3-Trichloropropane B152390-BLK1 ND mg/kg 0.0050 0.0019 1,1,2-Trichloro-1,2,2-trifluoroethane B152390-BLK1 ND mg/kg 0.0050 0.0010 1,2,4-Trimethylbenzene B152390-BLK1 ND mg/kg 0.0050 0.00080 1,3,5-Trimethylbenzene B152390-BLK1 ND mg/kg 0.0050 0.00066 Vinyl chloride B152390-BLK1 ND mg/kg 0.0050 0.00059
Total Xylenes B152390-BLK1 ND mg/kg 0.010 0.0025
p- & m-Xylenes B152390-BLK1 ND mg/kg 0.0050 0.0015
o-Xylene B152390-BLK1 ND mg/kg 0.0050 0.00093
1,2-Dichloroethane-d4 (Surrogate) B152390-BLK1 98.4 % 70 - 121 (LCL - UCL) Toluene-d8 (Surrogate) B152390-BLK1 99.6 % 81 - 117 (LCL - UCL) 4-Bromofluorobenzene (Surrogate) B152390-BLK1 99.2 % 74 - 121 (LCL - UCL) The results in this report apply to the samples analyzed in accordance with the chain of custody document . This analytical report must be reproduced in its entirety.

All results listed in this report are for the exclusive use of the submitting party. Pace Analytical assumes no responsibility for report alteration, separation, detachment or third party interpretation. 4100 Atlas Court Bakersfield, CA 93308 (661) 327-4911 FAX (661) 327-1918 www.pacelabs.com Report ID: 1001363273 Page 13 of 23 Appendix B-75 8660F10 July 12, 2023 - CONFORMED