Roof and Deck Insulation
07220-2 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/07220 (CONFORMED)

1.04 QUALITY ASSURANCE
A. Manufacturer qualifications: Manufacturer of proposed product for minimum 5 years with satisfactory performance record.

B. Installer qualifications:

1. Manufacturer-approved installer of products similar to specified products on minimum 5 projects of similar scope as Project with satisfactory performance record.

2. Committed to complying with manufacturer's specifications and NRCA recommendations.

3. Committed to assuming undivided responsibility for roof insulation, roofing membrane and sheet metal flashing, and trim associated with roofing.

C. Product compatibility: Provide roofing manufacturer approved roof insulation.

D. Pre-installation conference: Conduct as specified in Section 01312 - Project Meetings.

1.05 DELIVERY, STORAGE, AND HANDLING
A. Deliver, store, and handle products in accordance with manufacturer's instructions.

B. Label asphalt containers with certification of full compliance with requirements of ASTM D312, Table 1, and indicating equiviscous temperature, finished flowing temperature, and flash point.

C. Store roof system materials on pallets or dunnage at least 4 inches above ground and suitably covered to protect from weather.

1.06 SEQUENCING AND SCHEDULING
A. Apply no more insulation than can be completely covered with roofing membrane on the same day.

B. When installation of insulation and roof membrane cannot be completed within same day, install temporary water cutoffs at end of day's work and remove cutoffs prior to resumption of work.

1.07 WARRANTY
A. Furnished by roof membrane manufacturer, as specified in Section 07540 - Thermoplastic Polyolefin Roofing

Page 1198 of 3040 ends

Roof and Deck Insulation
07220-3 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/07220 (CONFORMED) PART 2 PRODUCTS

2.01 DESIGN AND PERFORMANCE CRITERIA
A. Roof insulation system: As follows with UL Class A and FM Class 1A fire classification and meeting FM 1-90 wind up-lift requirements.

1. Where tapered rigid foam insulation is indicated on the Drawings, insulation shall be as follows:
a. Multiple layer insulation, comprised of layers of flat and tapered rigid foam roof insulation, built up to provide a taper, sloped to drains, of 1/4-inch per foot minimum.
b. Minimum insulation thickness at roof drains shall be 1-1/2 inches. c. Provide drainage pattern as indicated on the Drawings.

2.02 MATERIALS
A. Tapered foam roof insulation:

1. Closed cell polyisocyanurate foam core bonded to universal fiberglass reinforced facers.

2. Utilizing environmentally compliant blowing agent.

3. Manufacturers: One of the following or equal:
a. Johns Manville, Inc., Tapered ENRGY 3.
b. Atlas Roofing Corp., Tapered ACFoam II.

B. Roof crickets and saddles: Tapered Perlite Roof Insulation or as otherwise recommended by roofing manufacturer to meet warranty requirements.

C. Primer: ASTM D41, asphalt primer.

D. Bitumen: ASTM D312, Type II, III, or IV petroleum asphalt, free from inorganic matter; as recommended by manufacturer for interply moppings to suit particular slope limitations.

2.03 ACCESSORIES
A. Screw fastener system for steel decks:

1. Self-drilling and self-tapping, zinc plated or stainless steel screws, sized for 1/2- to 3/4-inch exposure on exposed to view underside of deck, with minimum 3-inch square or diameter ribbed steel stress plates, hot-dip galvanized with minimum G-60 coating in accordance with ASTM A123.

2. Manufacturers: One of the following or equal:
a. Tru Fast.
b. TW Buildex.

Page 1199 of 3040 ends

Roof and Deck Insulation
07220-4 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/07220 (CONFORMED) PART 3 EXECUTION

3.01 EXAMINATION
A. Verify that deck is properly graded to outlets.

B. Verify that deck surfaces are clean, dry, and where required, coated with primer.

3.02 PREPARATION
A. Embed 1 ply of roofing felt over roof drains and minimum 6 inches over adjacent surface in solid uniform layer of plastic cement.

3.03 HEATING OF ASPHALT AND APPLICATION TEMPERATURES
A. Equip kettles and tankers with accurate, fully readable thermometers.

B. Do not heat asphalt to or above their flash points.

C. Avoid heating at or above finished flowing temperature.

D. When accepted, heat above finished flowing temperature for no more than 4 hours.

E. Apply asphalt at maximum 25 degrees Fahrenheit below finished flowing temperature or above equiviscous temperature.

F. Do not cut or alter bitumens.

3.04 INSTALLATION OVER STEEL DECK
A. Install roof insulation in accordance with manufacturer's specifications.

B. Secure wood nailers to roof deck adjoining eaves, at roof curbs for attachment of flashing and counterflashing, and at other locations indicated on the Drawings.

1. Nailers shall be built up of pressure treated wood to match the thickness of the insulation.

C. Apply first layer of roof insulation with long joints continuous, either parallel or at right angles to ribs of deck.

D. Form joints parallel to ribs over solid bearing.

E. Stagger end joints.

F. Secure with approved mechanical fasteners in FM I-90 pattern:

1. Space fasteners as recommended by insulation manufacturer.

2. Drive fasteners through tin caps or plastic fastener/cap assemblies, unless they are provided with integral flat cap not less than 1 inch across.

3. Install screw fastener system in top rib of steel deck in accordance with manufacturer's instructions. Where underside of metal deck is exposed to view, size fasteners to penetrate deck from 1/2- to 3/4-inch, unless otherwise recommended by fastener manufacturer.

Page 1200 of 3040 ends

Roof and Deck Insulation
07220-5 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/07220 (CONFORMED) G. Install cant strips at curbs, parapets, and intersections of roofs and vertical walls, when recommended by membrane manufacturer. Place on top of insulation and set in solid mopping of asphalt.

H. Roof crickets:

1. Install as required to achieve drainage pattern indicated on the Drawings, and as otherwise required to obtain roof warranty. Set in full mopping of hot asphalt. Feathered edges of crickets and tapered insulation shall be formed of perlite or fiber board.

2. Mop 12-inch wide felt strip into solid asphalt at valley formed by installation of roof crickets to provide additional membrane reinforcement.

I. Before application of roofing, turn over and solidly mop projecting felt to insulation at vertical surfaces and edges.

J. Do not leave insulation exposed to weather.

3.05 FIELD QUALITY CONTROL
A. Roof insulation which becomes wet or damaged shall be removed and replaced with solid, dry insulation, unless installer provides written acceptance of the damaged insulation from the roofing manufacturer, whose warranty shall cover the system.

B. Inspections: Roof membrane manufacturer, whose warranty shall cover complete roof assembly, shall provide supervision and inspection necessary to secure warranty.

END OF SECTION

Page 1201 of 3040 ends
Page 1202 of 3040 ends

Elastomeric Membrane Roofing
07530-1 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/07530 (CONFORMED) SECTION 07530

ELASTOMERIC MEMBRANE ROOFING
PART 1 GENERAL

1.01 SUMMARY
A. Section includes: Single-ply elastomeric membrane roofing system.

1.02 REFERENCES
A. American Society of Civil Engineers (ASCE):

1. 7 - Hazard Tool.

B. ASTM International (ASTM):

1. D751 - Standard Test Methods for Coated Fabrics.

2. D573 - Standard Test Method for Rubber-Deterioration in an Air Oven.

3. D1149 - Standard Test Method for Rubber Deterioration-Surface Ozone Cracking in an Ozone Controlled Environment.

4. D2136 - Standard Test Method for Coated Fabrics-Low-Temperature Bend Test.

5. D2240 - Standard Test Method for Rubber Property-Durometer Hardness.

6. E108 - Standard Test Methods for Fire Tests of Roof Coverings.

C. California Air Resources Board (ARB):

1. Architectural Coatings Suggested Control Measure.

D. Underwriters Laboratories, Inc. (UL).

1.03 SUBMITTALS
A. Product data: Include specifications and flashing details.

B. Detail drawings: Provide roofing system plans, elevations, sections, details, and details of attachment to other Work, including:

1. Base flashings and membrane terminations.

2. Tapered insulation, including slopes.

3. Crickets, saddles, and tapered edge strips, including slopes.

4. Insulation fastening and adhesive patterns.

5. Mechanical equipment, skylights, conduit, and other penetrations.

C. Samples:

1. For each product specified.

2. Each type of felt: 8 inches square.

D. Manufacturer's Installation Instructions.

E. Certificates: UL listings.

Page 1203 of 3040 ends

Elastomeric Membrane Roofing
07530-2 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/07530 (CONFORMED) F. Installer Authorization: Letter or certificate signed by roofing system manufacturer certifying that installer is approved, authorized, or licensed by manufacturer to install roofing system.

G. Maintenance manual: Include repair instructions.

H. Prior to beginning the Work of this Section:

1. Submit sample warranties.

2. Submit the final System Assembly Letter issued by manufacturer indicating that the products and system to be installed shall be eligible to receive the specified manufacturer's guarantee when installed by a certified contractor in accordance with manufacturer application requirements, inspected and approved by an authorized manufacturer representative.

3. Submit the Guarantee Application Confirmation document issued by manufacturer indicating that the project has been reviewed for eligibility to receive the specified guarantee/warranty and that the project is registered.

I. Upon substantial completion:

1. Submit final warranties.

1.04 QUALITY ASSURANCE
A. Manufacturer qualifications: Manufacturer of proposed product for minimum 5 years with satisfactory performance record.

B. Installer qualifications: Qualified firm that is approved, authorized, or licensed by roofing system manufacturer to install manufacturer’s product and that is eligible to receive the specified manufacturer’s guarantee/warranty.

C. Source Limitations:

1. Obtain all components from the single source roofing manufacturer guaranteeing the roofing system.

2. All products used in the system shall be labeled by the single source roofing manufacturer issuing the guarantee.

D. Pre-installation conference: Conduct as specified in Section 01312 - Project Meetings.

E. Verify roof and deck insulation in Section 07220 - Roof and Deck Insulation, and flashing and sheet metal in Section 07600 - Flashing and Sheet Metal are compatible with membrane roofing.

1.05 DELIVERY, STORAGE, AND HANDLING
A. Deliver, store, and handle products in accordance with manufacturer's recommendations.

B. Deliver materials with appropriate labels indicating warnings, storage conditions, lot numbers, and usage instructions.

C. Deliver materials in original unopened containers.

Page 1204 of 3040 ends

Elastomeric Membrane Roofing
07530-3 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/07530 (CONFORMED) D. Label containers with manufacturer's name, brand name, installation instructions, and identification of items.

E. Each container or bulk shipping ticket for asphalt shall indicate the equiviscous temperature, finished blowing temperature, and the flash point.

F. Store materials out of direct exposure to the elements.

G. Store roll goods on end on a clean flat surface.

H. Protect materials against moisture.

1.06 ENVIRONMENTAL REQUIREMENTS
A. Conform to volatile organic compound (VOC) limits specified in Table 1 of the California ARB Architectural Coatings Suggested Control Measure.

B. Do not apply roofing membrane during inclement weather or when air temperature may fall below 40 degrees Fahrenheit.

C. Do not apply roofing membrane to damp or frozen deck surface.

D. Do not expose materials vulnerable to water or sun damage in quantities greater than can be weatherproofed during same day.

1.07 WARRANTIES
A. As specified in Section 01783 - Warranties and Bonds.

B. Special warranty:

1. Manufacturer's warranty: Minimum 10 years to correct defective roofing materials, including installation.

2. Roofer's warranty: Minimum 2 years to correct defective workmanship.

3. Warranty rider for hail enhancement:
a. Hail: For hail up to 1 inches.
b. Moderate hail: 1.5.
c. Severe hail: For hail up to 2 inches.

4. Warranty rider for punctures:
a. Provides 8 hours per year for repair of punctures.
b. Provides 16 hours per year for repair of punctures.
c. Provides 32 hours per year for repair of punctures.

5. Warranty rider for ponding water.

6. Warranty rider for overburden.

PART 2 PRODUCTS

2.01 DESIGN AND PERFORMANCE CRITERIA
A. General: Installed roofing membrane system shall remain watertight; and resist specified wind uplift pressures, thermally induced movement, and exposure to weather without failure.

Page 1205 of 3040 ends

Elastomeric Membrane Roofing
07530-4 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/07530 (CONFORMED) B. Material compatibility: Roofing materials shall be compatible with one another under conditions of service and application required, as demonstrated by roofing system manufacturer based on testing and field experience.

C. Installer shall comply with current code requirements based on authority having jurisdiction.

D. Wind uplift performance: As specified in Section 01850 - Wind Design Criteria.

1. Roofing system shall be identical to systems that have been successfully tested by a qualified testing and inspecting agency to resist wind uplift pressure calculated in accordance with ASCE 7.

E. Roof live load, roof dead loads and snow load: As indicated on the structural Drawings.

F. Fire-test-response characteristics:

1. Provide roofing materials with the fire-test-response characteristics indicated as determined by testing identical products per test method below by UL, FMG, or another testing and inspecting agency acceptable to authorities having jurisdiction.

2. Materials shall be identified with appropriate markings of applicable testing and inspecting agency.

G. Fire hazard classification:

1. UL Class C.

H. Exterior fire-test exposure:

1. ASTM E108, Class C for application and roof slopes indicated.

2.02 ROOFING SYSTEMS
A. Type: Mechanically attached, 60-mil reinforced membrane assemblies.

B. Membrane color: Black.

2.03 MANUFACTURERS
A. One of the following or equal:

1. Carlisle Corp., Sure-Weld.

2. Johns Manville, EPDM R.

2.04 COMPONENTS
A. Membrane: 60 mil, scrim-reinforced, white, uncured polyolefin based rubber sheet approximately 75 inches wide by appropriate length conforming to following minimum physical properties:

1. Breaking strength: Minimum 225 pounds when tested in accordance with ASTM D751, Grab Method.

2. Tear strength: Minimum 55 pounds when tested in accordance with ASTM D751, Tongue Tear.

Page 1206 of 3040 ends

Elastomeric Membrane Roofing
07530-5 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/07530 (CONFORMED)

3. Brittleness: Passes bending around 1.8 inch mandrel at minus 45 degrees Celsius in accordance with ASTM D2136.

4. Shore A hardness: From 75 to 85 when tested in accordance with ASTM D2240.

5. Heat aging: Maintains 100 percent of original breaking strength after 28 days at 212 degrees Fahrenheit in accordance with ASTM D573.

6. Ozone resistance: No effect when subjected in 3 parts per million ozone and 30 percent strain at 104 degrees Fahrenheit for 72 hours and 25,000 hours in accordance with ASTM D1149.

7. Puncture resistance: Minimum 250 pounds when tested in accordance with FTM 191 B, Method 2031.

B. Roof walkway:

1. Provide roofing system manufacturer standard roof walkway.

2. Placement location requirements:
a. Traffic concentration points.
b. Regular maintenance access areas.
c. Coordinate roof access landing to connect with traffic concentration points and regular maintenance access areas.

C. Flashing, bonding adhesive, sealant, primer, seam caulk, and mechanical fasteners:

Membrane manufacturer approved.

PART 3 EXECUTION

3.01 EXAMINATION
A. Verification the following:

1. Proper installation of treated curbs, wood nailers, insulation, cants, and crickets.

2. Deck is properly graded to outlets. Build up potential birdbaths.

3. Deck surfaces are dry, clean, smooth, and free of sharp edges and debris.

3.02 PREPARATION
A. Prepare substrate to receive roofing system in accordance with roofing manufacturer's instructions.

B. Install flashings and similar accessory items in accordance with manufacturer's instructions.

C. Sweep surface to be covered clean of debris, dirt, or other sharp objects.

D. Prime metal flanges, concrete and masonry surface, and concrete roof deck to receive membrane roofing with a uniform coating of asphalt primer.

Page 1207 of 3040 ends

Elastomeric Membrane Roofing
07530-6 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/07530 (CONFORMED)

3.03 INSTALLATION
A. Install roofing in accordance with manufacturer's instructions and warranty.

B. Install perimeter sheets.

C. Lay field sheets with long edges perpendicular to roof slope, with edge of roll aligned with perimeter sheets.

D. Install screw fasteners, spaced in accordance with manufacturer's recommendations, along leading edge of membrane, through insulation, and into roof deck.

E. Overlap fastened edges of installed membrane by approximately 4-1/2 inches. Hot air weld edges with manufacture approved automatic hot air welder.

F. Prime cured material as required before hot air welding.

G. Seal cut edges with seam caulk.

H. Install metal flashing as specified in Section 07600 - Flashing and Sheet Metal and as indicated on the Drawings.

I. Fasten and finish perimeter in accordance with membrane manufacturer's standard details.

J. Where underside of metal deck is exposed to view, size fasteners to penetrate deck not more than 3/4 inch.

K. Cut walkway material into sections (maximum 36 inch). Heat weld in place with 6-inch gap between sections to allow proper drainage.

3.04 FIELD QUALITY CONTROL
A. Arrange for manufacturer's inspection of completed installation in the presence of the Engineer and the Owner.

3.05 PROTECTION
A. Before the end of each working day or before application is interrupted by precipitation, seal exposed sheet edges along laps and around drains, projections, and upstands.

B. Build cutoffs using asphalt or plastic cement and roofing felts, constructed to withstand protracted periods of service. Completely remove cutoffs prior to the resumption of roofing.

END OF SECTION

Page 1208 of 3040 ends

Thermoplastic Polyolefin (TPO) Membrane Roofing
07540-1 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/07540 (CONFORMED) SECTION 07540

THERMOPLASTIC POLYOLEFIN (TPO) MEMBRANE ROOFING
PART 1 GENERAL

1.01 SUMMARY
A. Section includes: Fully-adhered, 60 mil thermoplastic polyolefin membrane, white, scrim-reinforced roofing system.

1.02 REFERENCES
A. American Society of Civil Engineers (ASCE):

1. 7 – Hazard Tool.

B. ASTM International (ASTM):

1. D751 – Standard Test Methods for Coated Fabrics.

2. E108 – Standard Test Methods for Fire Tests of Roof Coverings.

C. California Air Resources Board (ARB):

1. Architectural Coatings Suggested Control Measure.

D. Single Ply Roofing Industry (SPRI):

1. SPRI WD-1 - Wind Design Standard Practice for Roofing Assemblies.

E. Underwriters Laboratories, Inc.(UL).

1.03 SUBMITTALS
A. Product data: Include specifications and flashing details.

B. Detail drawings: Provide roofing system plans, elevations, sections, details, and details of attachment to other Work, including:

1. Base flashings and membrane terminations.

2. Tapered insulation, including slopes.

3. Crickets, saddles, and tapered edge strips, including slopes.

4. Insulation fastening and adhesive patterns.

5. Mechanical equipment, skylights, conduit, and other penetrations.

C. Samples:

1. For each product specified.

2. Each type of felt: 8 inches square.

D. Manufacturer's Installation Instructions.

Page 1209 of 3040 ends

Thermoplastic Polyolefin (TPO) Membrane Roofing
07540-2 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/07540 (CONFORMED) E. Certificates:

1. UL listings.

2. Letter of certification from the manufacturer certifying the roofing contractor is authorized to install the manufacturer's roofing system, include certified foreman and training dates.

3. Indicating membrane thickness from the membrane manufacturer.

F. Installer Authorization: Letter or certificate signed by roofing system manufacturer certifying that installer is approved, authorized, or licensed by manufacturer to install roofing system.

G. Maintenance manual: Include repair instructions.

H. Prior to beginning the Work of this Section:

1. Submit sample warranties.

2. Submit the final System Assembly Letter issued by manufacturer indicating that the products and system to be installed shall be eligible to receive the specified manufacturer's guarantee when installed by a certified contractor in accordance with manufacturer application requirements, inspected and approved by an authorized manufacturer representative.

3. Submit the Guarantee Application Confirmation document issued by manufacturer indicating that the project has been reviewed for eligibility to receive the specified guarantee/warranty and that the project is registered.

I. Upon substantial completion:

1. Submit final warranties.

1.04 QUALITY ASSURANCE
A. Manufacturer qualifications: Manufacturer of proposed product for minimum 5 years with satisfactory performance record.

B. Installer qualifications: Qualified firm that is approved, authorized, or licensed by roofing system manufacturer to install manufacturer’s product and that is eligible to receive the specified manufacturer’s guarantee/warranty.

C. Source Limitations:

1. Obtain all components from the single source roofing manufacturer guaranteeing the roofing system.

2. All products used in the system shall be labeled by the single source roofing manufacturer issuing the guarantee.

D. Pre-installation conference: Conduct as specified in Section 01312 - Project Meetings.

E. Verify existing roof, deck insulation, and roof specialties and accessories in Section 07700 - Roof Specialties are compatible with membrane roofing.

Page 1210 of 3040 ends

Thermoplastic Polyolefin (TPO) Membrane Roofing
07540-3 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/07540 (CONFORMED)

1.05 DELIVERY, STORAGE, AND HANDLING
A. Deliver materials in original unopened containers.

B. Label containers with manufacturer's name, brand name, installation instructions, and identification of items.

C. Each container or bulk shipping ticket for asphalt shall indicate the equiviscous temperature, finished blowing temperature, and the flash point.

D. Store materials out of direct exposure to the elements.

E. Store roll goods on end on a clean flat surface.

F. Protect materials against moisture.

1.06 ENVIRONMENTAL REQUIREMENTS
A. Conform to volatile organic compound (VOC) limits specified in Table 1 of the California ARB Architectural Coatings Suggested Control Measure.

B. Do not apply roofing membrane during inclement weather or when air temperature may fall below 40 degrees Fahrenheit.

C. Do not apply roofing membrane to damp or frozen deck surface.

D. Do not expose materials vulnerable to water or sun damage in quantities greater than can be weatherproofed during same day.

1.07 WARRANTY
A. As specified in Section 01783 - Warranties and Bonds.

B. Special warranty:

1. Manufacturer's warranty:
a. Minimum 20 years to correct defective roofing materials, including installation.

2. Roof Installer's warranty: Minimum 2 years to correct defective workmanship.

PART 2 PRODUCTS

2.01 MANUFACTURERS
A. One of the following or equal:

1. Carlisle Corp., Sure-Weld Roofing System.

2. Johns Manville, JM TPO Roofing Systems.

Page 1211 of 3040 ends

Thermoplastic Polyolefin (TPO) Membrane Roofing
07540-4 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/07540 (CONFORMED)

2.02 D TYPE
A. Type: Fully-adhered, 60 mil, reinforced thermoplastic polyolefin (TPO) membrane assemblies.

B. Membrane color: White.

2.03 DESIGN AND PERFORMANCE CRITERIA
A. General: Installed roofing membrane system shall remain watertight; and resist specified wind uplift pressures, thermally induced movement, and exposure to weather without failure.

B. Material compatibility: Roofing materials shall be compatible with one another under conditions of service and application required, as demonstrated by roofing system manufacturer based on testing and field experience.

C. Installer shall comply with current code requirements based on authority having jurisdiction.

D. Design uplift pressures:

1. In accordance with building code: As specified in Section 01410 - Regulatory Requirements.

2. In accordance with SPRI WD-1.

3. In accordance with ASCE 7 – Minimum Design Loads and Associated Criteria for Buildings and Other Structures (ASCE.SEI 7-16).

E. Wind uplift performance:

1. As specified in Section 01850 - Design Criteria.

2. Roofing system shall be identical to systems that have been successfully tested by a qualified testing and inspecting agency to resist wind uplift pressure calculated in accordance with ASCE 7.

F. Wind pressure at each element: As indicated on the structural Drawings.

G. Roof live load, roof dead loads and snow load: As indicated on the structural Drawings.

H. Fire-test-response characteristics:

1. Provide roofing materials with the fire-test-response characteristics indicated as determined by testing identical products per test method below by UL, FMG, or another testing and inspecting agency acceptable to authorities having jurisdiction.

2. Materials shall be identified with appropriate markings of applicable testing and inspecting agency.

I. Fire hazard classification:

1. UL Class C.

J. Exterior fire-test exposure:

1. ASTM E108, Class C for application and roof slopes indicated.

Page 1212 of 3040 ends

Thermoplastic Polyolefin (TPO) Membrane Roofing
07540-5 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/07540 (CONFORMED)

2.04 COMPONENTS
A. Scrim-Reinforced Thermoplastic Polyolefin (TPO) Sheet: 60 mil, scrim-reinforced, white, membrane 10-feet wide maximum by appropriate length conforming to following minimum physical properties:

1. Tensile strength: Minimum of 300 pounds per foot as tested in accordance with ASTM D751.

2. Tear strength: Minimum 45-60 pounds when tested in accordance with ASTM D751.

B. Flashing, bonding adhesive, sealant, primer, seam caulk, insulation replacement, and fasteners: Membrane manufacturer approved.

PART 3 EXECUTION

3.01 EXAMINATION
A. Verification the following:

1. Proper installation of treated curbs, wood nailers, insulation, cants, and crickets.

2. Deck is properly graded to outlets. Build up potential birdbaths.

3. Deck surfaces are dry, clean, smooth, and free of sharp edges and debris.

3.02 PREPARATION
A. Prepare substrate to receive roofing system in accordance with roofing manufacturer's instructions.

B. Install flashings and similar accessory items in accordance with manufacturer's instructions.

C. Sweep surface to be covered clean of debris, dirt, or other sharp objects.

D. Prime metal flanges, concrete and masonry surface, and concrete roof deck to receive membrane roofing with a uniform coating of asphalt primer.

3.03 INSTALLATION
A. Install roofing in accordance with manufacturer's instructions and warranty.

B. Install perimeter sheets.

C. Lay field sheets with long edges perpendicular to roof slope, with edge of roll aligned with perimeter sheets.

D. Fully adhered membrane shall be bonded to the substrate with manufacturer's approved adhesives. Overlap fastened edges of installed membrane by approximately 5-1/2 inches at fastening plates and 2 inches at end roll sections.

Page 1213 of 3040 ends

Thermoplastic Polyolefin (TPO) Membrane Roofing
07540-6 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/07540 (CONFORMED) E. Seal non-factory cut edges with seam caulk.

F. Fasten and finish perimeter in accordance with membrane manufacturer's standard termination details.

3.04 FIELD QUALITY CONTROL
A. Arrange for manufacturer's inspection of completed installation in the presence of the Engineer and the Owner.

3.05 PROTECTION
A. Before the end of each working day or before application is interrupted by precipitation, seal exposed sheet edges along laps and around drains, projections, and upstands.

B. Build cutoffs using asphalt or plastic cement and roofing felts, constructed to withstand protracted periods of service. Completely remove cutoffs prior to the resumption of roofing.

END OF SECTION

Page 1214 of 3040 ends

Flashing and Sheet Metal
07600-1 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/07600 (CONFORMED) SECTION 07600

FLASHING AND SHEET METAL
PART 1 GENERAL

1.01 SUMMARY
A. Section includes: flashing, sheet metal, and associated accessories.

1.02 REFERENCES
A. Aluminum Association (AA).

B. ASTM International (ASTM):

1. A240 - Standard Specification for Chromium and Chromium-nickel Stainless Steel Plate, Sheet, and Strip For Pressure Vessels and General Applications.

2. A653 - Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process.

3. B32 - Standard Specification for Solder Metal.

4. B209 - Standard Specification for Aluminum and Aluminum-Alloy Sheet and Plate.

5. B221 - Standard Specification for Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes.

6. B224 - Standard Classification of Coppers.

7. B370 - Standard Specification for Copper Sheet and Strip for Building Construction.

8. B749 - Standard Specification for Lead and Lead Alloy Strip, Sheet, and Plate Products.

9. D226 - Standard Specification for Asphalt-Saturated Organic Felt Used in Roofing and Waterproofing.

10. D4586 - Standard Specification for Asphalt Roof Cement, Asbestos-Free.

C. Sheet Metal and Air Conditioning Contractors National Association, Inc. (SMACNA).

1.03 SUBMITTALS
A. Product data.

B. Shop drawings: Show fabrication details, material profiles, connections, jointing pattern, jointing details, fastening methods, isolation methods, and installation details.

C. Manufacturer's Installation Instructions.

1.04 SEQUENCING AND SCHEDULING
A. Coordinate sheet metal installation with installation of materials specified in Sections 07530 - Elastomeric Membrane Roofing, 07700 - Roof Specialties, 07900 - Joint Sealants, 15050 - Common Work Results for Mechanical Equipment.

Page 1215 of 3040 ends

Flashing and Sheet Metal
07600-2 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/07600 (CONFORMED)

1.05 DELIVERY, STORAGE, AND HANDLING
A. Stack preformed material to prevent twisting, bending, or abrasion, and to provide ventilation.

B. Prevent contact with materials during storage which may cause discoloration, staining, or damage.

PART 2 PRODUCTS

2.01 MATERIALS
A. Aluminum extrusions: ASTM B221, alloy 6063-T42.

B. Aluminum sheet: ASTM B209, 5005-H14 alloy and temper; minimum 32 mils thick.

2.02 ACCESSORIES
A. Fasteners and metal washers: Types best suited for purpose, of same material as sheet metal being fastened or of composition that will not support electrolysis, such as Type 18-8 stainless steel for fastening aluminum.

B. Sealer washers: Rubber type, minimum 0.040 inch thick.

C. Underlayment: ASTM D226; Number 30 asphalt saturated roofing felt. Polyethylene, 6 mil thick.

D. Protective backing paint: Bituminous.

E. Slip sheet: Rosin sized building paper.

F. Bedding compound: Rubber-asphalt type.

G. Roof cement: ASTM D4586, plastic asphaltic cement.

H. Solder: ASTM B32.

2.03 FABRICATION
A. Form sheet metal true to shape, accurate in size, square, and free from distortion or defects.

B. Form rises and angles into flashing true and straight, with exposed surfaces free from waves and buckles.

C. Fabricate cleats and starter strips of same material as sheet, minimum 3 inches wide, interlockable with sheet.

D. Form pieces in longest practical lengths. Size and space joints to provide adequate movement for thermal expansion and contraction.

Page 1216 of 3040 ends

Flashing and Sheet Metal
07600-3 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/07600 (CONFORMED) E. Hem exposed edges on underside 1/2 inch; miter and seam corners.

F. Form material with standing seams.

G. Solder and seal metal joints. After soldering, remove flux. Wipe and wash solder joints clean.

H. Fabricate corners from 1 piece with minimum 18 inch long legs; seam for rigidity, seal with sealant.

I. Fabricate vertical faces with bottom edge formed outward 1/4 inch and hemmed to form drip.

J. Fabricate flashings to allow toe to extend a minimum 2 inches over roofing. Return and break edges.

2.04 FINISH
A. Backpaint concealed metal surfaces with protective backing paint to minimum dry film thickness of 15 mil.

PART 3 EXECUTION

3.01 EXAMINATION
A. Verify roof openings, curbs, pipes, sleeves, ducts, or vents through roof are solidly set, cant strips and reglets in place, and nailing strips located.

B. Verify membrane termination and base flashings are in place, sealed, and secure.

3.02 INSTALLATION
A. Install flashing and sheet metal in accordance with AA and SMACNA references, and when in connection with roofing, roofing manufacturer's specifications.

B. Install sheet metal to even smooth, sound, thoroughly clean and dry surfaces, free from defects that could affect installation.

C. Install flashings where necessary to provide leakproof conditions.

D. Isolate dissimilar metals from direct contact with protective backing paint.

E. Install starter, edge strips, and cleats before starting installation.

F. Perform cutting, fitting, drilling, and other operations in connection with sheet metal required to accommodate work of other sections.

G. Install sealer washers under metal washers or fastener heads where weathertightness is required.

Page 1217 of 3040 ends

Flashing and Sheet Metal
07600-4 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/07600 (CONFORMED) H. Install surface mounted reglets true to lines and levels. Seal top of reglets with sealant.

I. Insert counterflashings into reglets to form tight fit.

J. Secure flashings in place using concealed fasteners. Use exposed fasteners only in locations acceptable to the Engineer.

K. Lap and seal joints. Make connections watertight and weathertight.

L. Apply roof cement compound between metal flashings and felt flashings.

1. Fit flashings tight in place.

2. Make corners square, surfaces true and straight in planes, and line accurate to profiles.

M. Seal metal joints watertight.

END OF SECTION

Page 1218 of 3040 ends

Roof Specialties
07700-1 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/07700 (CONFORMED) SECTION 07700

ROOF SPECIALTIES
PART 1 GENERAL

1.01 SUMMARY
A. Section includes: Manufactured roof specialties and accessories, including the following:

1. Metal coping.

2. Metal gravel stop fascia.

3. Expansion joint covers.

4. Equipment curbs and supports, and associated accessories.

5. Reglet and counterflashing systems.

1.02 REFERENCES
A. Single Ply Roofing Industry (SPRI):

1. ES-1 - Test Standard for Edge Systems Used with Low Slope Roofing Systems.

1.03 SUBMITTALS
A. Product data: Include finish and color options.

B. Shop drawings. Include equipment curbs and supports details.

C. Certifications: Certify that curbs are capable of supporting the specified equipment including loads specified in Section 01850 - Design Criteria.

D. Samples: Include finish and color samples.

E. Manufacturer's Installation Instructions.

F. Warranties.

1.04 QUALITY ASSURANCE
A. Manufacturer qualifications: Manufacturer of proposed product for minimum 5 years with satisfactory performance record.

B. Installer qualifications: Installer of products similar to specified products on minimum 5 projects of similar scope as Project with satisfactory performance record.

1.05 DELIVERY, STORAGE, AND HANDLING
A. Deliver, store, and handle products in accordance with manufacturer's recommendations.

Page 1219 of 3040 ends

Roof Specialties
07700-2 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/07700 (CONFORMED)

1.06 WARRANTY
A. Provide manufacturers' standard warranties that warranty against defects for longer than 1 year.

PART 2 PRODUCTS

2.01 METAL COPINGS
A. Manufacturers: One of following or equal:

1. Peterson Aluminum Corp., Pac-Lok.

2. MM Systems Corp., Snap-Lok.

3. OMG Roofing Products, Permasnap.

B. Characteristics:

1. Capable of direct attachment to top of masonry walls.

2. In accordance with SPRI ES-1.

3. In accordance with codes as specified in Section 01410 - Regulatory Requirements.

4. Capable of counterflashing roofing.

C. Copings:

1. Material: Aluminum, minimum 0.063 inch thick.

2. Width: To suit wall thickness.

3. Length: 144 inches.

4. Face heights: Sufficient to conceal nailers or roof decking.

5. Corners: Mitered and welded with minimum 24-inch legs.

6. Finish: Kynar® 500, resin-base color coating. Color as selected from manufacturer's standard color line.

D. Splice plates: Same materials, width, face heights, and finish as coping, 6 inches long.

E. Seal strips: Extruded Butyl with protective paper.

F. Anchor plate: Galvanized steel. Same width, face height as coping, approximately 12 inches long.

G. Fasteners and anchors: Manufacturer's recommendation.

2.02 GRAVEL STOPS FASCIA FOR SINGLE PLY ROOFING
A. Manufacturers: One of the following or equal:

1. Peterson Aluminum Corp., Pac-1-Ply.

2. MM Systems Corp., SLF- Series II.

3. OMG Roofing Products, TerminEdge.

B. Fascia up to 8 inches high:

1. Material: Aluminum, minimum 0.040-inch thick.

2. Length: Maximum practical.

Page 1220 of 3040 ends

Roof Specialties
07700-3 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/07700 (CONFORMED)

3. Face height: Sufficient to conceal edges of nailers or roof decking.

4. Corners: Mitered and welded with minimum 24-inch legs.

5. Finish: Kynar® 500, resin-base color coating. Color as selected from manufacturer's standard color line.

C. Splice plates: Same materials, width, face heights, and finish as coping.

D. Cant dams and hold-down clips: Galvanized steel, minimum 24 gauge, continuous.

E. Screws: Stainless steel.

2.03 EQUIPMENT CURBS
A. Definition:

1. 4-sided curb supporting the footprint (outline) of the roof-mounted equipment.

2. It may surround a full deck opening as at a duct or skylight, a partial deck opening as at supply and return ducts below an A/C unit, or there may be no deck opening within the curb as at a side discharge A/C unit.

B. Manufacturers: One of following or equal:

1. Equipment curbs provided by the equipment manufacturer as specified in the equipment sections.

C. Design requirements:

1. Capable of supporting equipment loads.

2. Size: Curb width as indicated on the Drawings or as otherwise recommended by the equipment manufacturer.

3. Curb manufacturer to coordinate curb capacity and width with the equipment supplier.

D. Material and fabrication:

1. Metal: Galvanized steel; gauge as required to suit equipment loads, minimum 18 gauge.

2. Rail profile: Straight, without cant.

3. Rail height: Minimum 12 inches at uniform thickness insulation and 15 inches at tapered insulation, including nailer.

4. Rail top: Level within 1/8 inch in 10 feet (adjust for roof slope).

5. Rail width: Width of nailer.

6. Rail reinforcement: Rolled tee bar at 24 inches on center.

7. Rail infill: Insulation, 3-pound density.

8. Nailer: Nominal 2 inch by width to suit equipment supported, pressure preservative treated wood, and manufacturer recommended species.

9. Base: Adequately sized to ensure proper anchoring.

10. Corners: Mitered and continuously welded with minimum 24-inch legs.

E. Accessories:

1. Curb liner: Minimum 22 gauge galvanized steel, spot welded to curb, to finish inside of curbs exposed to view from below.

2. Curb platform: Minimum 3/4-inch thick plywood platform over top of curb, capped with 20-gauge galvanized metal welded watertight to support open

Page 1221 of 3040 ends

Roof Specialties
07700-4 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/07700 (CONFORMED) sled-based roof equipment, or as watertight closure over curbed opening for future equipment.

3. Metal roofing adapters: Fabricated to conform to exposed metal roofing profile, overlapping deck by minimum 3 inches, with water diverters on flat area; watertight, continuous welds.

2.04 EQUIPMENT SUPPORTS
A. Definition: A linear rail or rails for mounting horizontal piping across the top of roof or for supporting roof equipment on legs.

B. Linear rails:

1. Manufacturers: One of the following or equal:
a. Pate Co., Model ES-2.
b. ThyCurb, Model TEMS.
c. Roof Products, Inc., Model RPES-3.

C. Material and fabrication:

1. Material: 14 gauge galvanized.

2. Rail profile: Straight, without cant profile.

3. Rail height: Minimum 12 inches including nailer at uniform thickness insulation and 15 inches at tapered insulation, including nailer.

4. Rail top: Level within 1/8 inch in 10 feet (adjust for slope of roof).

5. Rail width: Width of nailer.

6. Rail reinforcement: Rolled tee bar at 24 inches on center.

7. Rail infill: None.

8. Nailer: Nominal 2- by 4-inch pressure preservative treated wood, manufacturer recommended species.

9. Base: Adequately sized to ensure proper anchoring.

2.05 REGLET AND COUNTERFLASHING SYSTEMS
A. Manufacturers: One of the following or equal:

1. Fry Corp.

2. Cheney Flashing Co.

B. Metal reglet and counterflashing system:

1. Material: Aluminum, minimum 0.025-inch thick.

2. Reglet: Type for embedding in masonry with 1-1/2-inch wide top flange.

3. Counterflashing: Formed with snap lock flange to engage reglet receive and to provide spring action at bottom edge against roofing base flashing.

4. Hold-down clips: Type 302 stainless steel, with fasteners.

5. Sealant: As specified in Section 07900.

C. Retainer system for flexible counterflashing:

1. Retainer: Type for embedding in masonry.

2. Locking gasket: Vinyl rope capable of locking into reglet and firmly holding flashing.

3. Flashing: As specified in Section 07530 - Elastomeric Membrane Roofing.

4. Sealant: As specified in Section 07900 - Joint Sealants.

Page 1222 of 3040 ends

Roof Specialties
07700-5 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/07700 (CONFORMED) D. Reglet system for non-proprietary counterflashing:

1. Reglet: Original with spacer channel and vinyl rope.

2. Flashing: As specified in Section 07600 - Flashing and Sheet Metal.

3. Sealant: As specified in Section 07900 - Joint Sealants.

E. Lengths: Longest possible.

F. Joints: With alignment splines.

G. Corners: Prefabricated, watertight.

PART 3 EXECUTION

3.01 INSTALLATION
A. Install roof accessories and specialties accordance with manufacturers' instructions.

3.02 INSTALLATION OF METAL COPINGS
A. Accurately align and install metal copings with uniformly smooth vertical faces.

B. Attach anchor plate to top of wall at 72 inches on center.

C. Install splice plates on anchor plates at splice joints of coping. Install seal strips on top of plate and down face approximately 1/2 inch. Apply slight pressure on sealant to incur adherence to clean, dry splice plate. Remove protective paper from sealant.

D. Fully engage hook on front face of coping with front leg of anchor plates, pivot coping into position pressing firmly at rear over each anchor plate until hook on rear face of coping snaps into place.

E. Leave 1/4-inch joint between abutting ends at splice plates.

3.03 INSTALLATION OF GRAVEL STOPS
A. Locate joints in balanced pattern along each run, from end to end.

B. Overlap cant dams 1 inch. Nail to top of nailer at maximum 12 inches on center and face of nailer at maximum 24 inches on center, unless otherwise specified by roofing manufacturer.

C. Accurately align and install gravel stops with uniformly smooth vertical faces.

3.04 INSTALLATION OF EXPANSION JOINT COVERS
A. Nail longitudinal nailing strips to wood nailer at 2 inch centers.

B. Strip flanges as specified in Section 07540 - Thermoplastic Polyolefin (TPO) Membrane Roofing.

Page 1223 of 3040 ends

Roof Specialties
07700-6 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/07700 (CONFORMED)

3.05 INSTALLATION OF EQUIPMENT CURBS AND SUPPORTS
A. Curbs: Install at roof mounted equipment where specified or indicated.

B. Supports: Install where indicated on the Drawings.

3.06 INSTALLATION OF METAL REGLET AND COUNTERFLASHING SYSTEM A. Verify that reglets have been installed properly with minimum 3-inch overlaps.

B. Apply sealant on back of surface mounted reglets. Fasten reglets to wall with minimum 3-inch overlaps.

C. Install hold-down clips at minimum 30 inches on center. Insert counterflashings in reglets. Ensure spring action of counterflashing over roofing base flashings. Turn hold-down clips over counterflashings.

D. Apply sealant on tops of surface mounted reglets in accordance with Section 07900 - Joint Sealants.

END OF SECTION

Page 1224 of 3040 ends

Roof Hatches
07722-1 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/07722 (CONFORMED) SECTION 07722

ROOF HATCHES
PART 1 GENERAL

1.01 SUMMARY
A. Section includes: Roof hatches.

1.02 REFERENCES
A. American National Standards Institute (ANSI).

1.03 SUBMITTALS
A. Product data: Indicate general construction, configurations, and jointing methods.

B. Shop drawings: Show locations, sizes, fastening methods, and installation details.

C. Manufacturer's Installation Instructions.

1.04 WARRANTY
A. As specified in Section 01783 - Warranties and Bonds.

B. Special warranty:

1. Duration: 5 years warranty on product defects.

PART 2 PRODUCTS

2.01 ROOF HATCHES
A. Manufacturers: One of the following or equal:

1. The Bilco Co.

2. Nystrom.

2.02 SINGLE LEAF FOR LADDER ACCESS
A. Size:

1. Ladder applications:
a. Nominal size: 42-inches by 30-inches.
b. Cover opening angle minimum: 70 degrees.

B. Cover and curb:

1. Material:
a. Exterior surface and curb material:
1) Minimum 14-gauge galvanized galvanneal steel.

Page 1225 of 3040 ends

Roof Hatches
07722-2 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/07722 (CONFORMED) b. Interior surface material:
1) Minimum 22-gauge galvanized steel liner.
2) Fully covering cover insulation.

2. Cover:
a. Corners:
1) 3-inch beaded flange and welded.
2) Weathertight corners.
b. Insulation:
1) Nominal 1-inch thick fiberglass.

3. Curb:
a. Height: Minimum 12 inches.
b. Insulation: 1-inch thick fiberboard on outside.
c. Flange: Minimum 3-1/2-inch with holes for fasteners, and welded, weathertight corners.

4. Safety guardrail:
a. Manufacturers: One of the following or equal:
1) The Bilco Co., Model RL2.
2) Nystrom, SRCAY.
b. Rail material: Aluminum or galvanized steel.
c. Finish: Safety yellow powder coating.
d. Gate: Spring hinged and latched.

5. Curb and roofing interface:
a. Non-metal roofing:
1) Integral metal cap flashing.

C. Finish:

1. Steel hatches: Red oxide primer paint.

D. Hardware:

1. Heavy pintle hinges.

2. Compression spring operators enclosed in telescopic tubes.

3. Positive snap latch with turn handles, both inside and outside.

4. Padlock hasps, both inside and outside.

5. Gasket:
a. EPDM rubber gasket adhered to the liner.

6. Automatic hold-open arm with red vinyl grip handle capable of 1-hand release.

7. Enclosed 2-point spring latch as recommended by manufacturer.

E. Latch hardware:

1. Hardware including latch assembly, inside and outside padlock hasps, arm guide bracket, lifting mechanism bracket, hinges, hinge pins, hold open arm, lock strike casting, springs, spring tubes, shoe castings, and fasteners.

2. Zinc chromate plated.

F. Fall prevention system:

1. As specified in Section 05500 - Metal Fabrications.

Page 1226 of 3040 ends

Roof Hatches
07722-3 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/07722 (CONFORMED)

2.03 SINGLE LEAF
A. Size:

1. Equipment access applications:
a. Nominal size: 42-inches by 38-inches.
b. Cover opening angle minimum: 90 degrees.

B. Cover and curb:

1. Material:
a. Exterior surface and curb material:
1) Minimum 14-gauge galvanized galvanneal steel.
b. Interior surface material:
1) Minimum 22-gauge galvanized steel liner.
2) Fully covering cover insulation.

2. Cover:
a. Corners:
1) 3-inch beaded flange and welded.
2) Weathertight corners.
b. Insulation:
1) Nominal 1-inch thick fiberglass. Nominal 2-inch polyiso in cover.

3. Curb:
a. Height: Minimum 12 inches.
b. Insulation: 1-inch thick fiberboard on outside.
c. Flange: Minimum 3-1/2-inch with holes for fasteners, and welded, weathertight corners.

4. Safety guardrail:
a. Rail material: Aluminum or galvanized steel.
b. Finish: Safety yellow powder coating.
c. Gate: Spring hinged and latched.

5. Curb and roofing interface:
a. Non-metal roofing:
1) Integral metal cap flashing.

C. Finish:

1. Steel hatches: Red oxide primer paint.

D. Hardware:

1. Heavy pintle hinges.

2. Compression spring operators enclosed in telescopic tubes.

3. Positive snap latch with turn handles, both inside and outside.

4. Padlock hasps, both inside and outside.

5. Gasket:
a. EPDM rubber gasket adhered to the liner.

6. Automatic hold-open arm with red vinyl grip handle capable of 1-hand release.

7. Enclosed 2-point spring latch as recommended by manufacturer.

E. Latch hardware:

1. Hardware including latch assembly, inside and outside padlock hasps, arm guide bracket, lifting mechanism bracket, hinges, hinge pins, hold open arm, lock strike casting, springs, spring tubes, shoe castings, and fasteners.

2. Zinc chromate plated.

Page 1227 of 3040 ends

Roof Hatches
07722-4 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/07722 (CONFORMED)

2.04 DOUBLE LEAF FOR EQUIPMENT ACCESS
A. Size:

1. Equipment access applications:
a. Nominal size: 42-inches by 38-inches.
b. Cover opening angle minimum: 90 degrees.
c. Cover and curb:

2. Material:
a. Exterior surface and curb material:
1) Minimum 14-gauge galvanized galvanneal steel.
b. Interior surface material:
1) Minimum 22-gauge galvanized steel liner.
2) Fully covering cover insulation.

3. Cover:
a. Corners:
1) 3-inch beaded flange and welded.
2) Weathertight corners.
b. Insulation:
1) Nominal 1-inch thick fiberglass.

4. Curb:
a. Height: Minimum 12 inches.
b. Insulation: 1-inch thick fiberboard on outside.
c. Flange: Minimum 3-1/2-inch with holes for fasteners, and welded, weathertight corners.

5. Safety guardrail:
a. Rail material: Aluminum or galvanized steel.
b. Finish: Safety yellow powder coating.
c. Gate: Spring hinged and latched.

6. Curb and roofing interface:
a. Non-metal roofing:
1) Integral metal cap flashing.

B. Finish:

1. Steel hatches: Red oxide primer paint.

C. Hardware:

1. Heavy pintle hinges.

2. Compression spring operators enclosed in telescopic tubes.

3. Positive snap latch with turn handles, both inside and outside.

4. Padlock hasps, both inside and outside.

5. Gasket:
a. EPDM rubber gasket adhered to the liner.

6. Automatic hold-open arm with red vinyl grip handle capable of 1-hand release.

7. Enclosed 2-point spring latch as recommended by manufacturer.

D. Latch hardware:

1. Hardware including latch assembly, inside and outside padlock hasps, arm guide bracket, lifting mechanism bracket, hinges, hinge pins, hold open arm, lock strike casting, springs, spring tubes, shoe castings, and fasteners.

2. Zinc chromate plated.

Page 1228 of 3040 ends

Roof Hatches
07722-5 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/07722 (CONFORMED) PART 3 EXECUTION

3.01 INSTALLATION
A. Hatch quantities and locations shall be as indicated on the Drawings.

B. Install roof hatches in accordance with manufacturer's instructions.

1. Coordinate with installation of roofing system and related flashing.

2. Provide weathertight installation.

C. Paint hatch as specified in Section 09960 - High-Performance Coatings.

END OF SECTION

Page 1229 of 3040 ends
Page 1230 of 3040 ends

Steel Roofing Walkways
07723-1 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/07723 (CONFORMED) SECTION 07723

STEEL ROOFING WALKWAYS
PART 1 GENERAL

1.01 SUMMARY
A. Section includes: Galvanized steel, roof-mounted walkway.

1.02 REFERENCES
A. American Iron and Steel Institute (AISI):

1. Cold-Formed Steel Design Manual.

B. ASTM International (ASTM):

1. A653 - Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process.

1.03 DEFINITIONS
A. Clips: Attachments between planks, support plates, and roof deck ribs.

B. Planks: The walkway surface elements which may span parallel or perpendicular to the ribs of the roof deck.

C. Support Plates: Plates that span between roof deck ribs to support planks that are parallel to the roof deck ribs.

1.04 SUBMITTALS
A. Product data.

B. Shop drawings and calculations:

1. Shop drawings: For roof walkway system, including details on connections to roof.

2. Calculations:
a. Complete test reports indicating maximum allowable loading, both uniform and concentrated, and the associated deflections.
b. Use methods outlined in the AISI Cold-Formed Steel Design Manual. c. Use a live load safety factor of 2.

1.05 DELIVERY, STORAGE, AND HANDLING
A. Storage and protection:

1. Store planks and accessories at the site stacked on platforms or pallets and covered with tarpaulins or other suitable weathertight covering.

2. Remove damaged, unlabeled, untagged, rusty, and deteriorated material from the job site.

Page 1231 of 3040 ends

Steel Roofing Walkways
07723-2 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/07723 (CONFORMED) PART 2 PRODUCTS

2.01 MANUFACTURERS
A. The following or equal:

1. Unistrut Corp., Roofwalks.

2.02 DESIGN AND PERFORMANCE CRITERIA
A. Design requirements:

1. Design roof walkway to support a uniform live load of 180 pounds per square foot and a concentrated load of 426 pounds per plank.

2. Design of attachment assembly to roof shall not penetrate roof deck.

B. Performance requirements:

1. Top of planks shall have an anti-skid surface that provides 360-degree positive traction.

2.03 MATERIALS
A. Planks, supporting plates, and clips shall have G90 coating in accordance with ASTM A653.

B. Planks shall be a minimum of 18 gauge roll-formed sheet steel:

1. Supporting plates shall be a minimum of 14 gauge sheet steel.

2. Clips shall be a minimum of 16 gauge sheet steel.

PART 3 EXECUTION

3.01 INSTALLATION
A. Install products as indicated on the Drawings and in accordance with shop drawings and manufacturer's printed instructions, applicable except where specified otherwise.

END OF SECTION

Page 1232 of 3040 ends

Joint Sealants
07900-1 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/07900 (CONFORMED) SECTION 07900

JOINT SEALANTS
PART 1 GENERAL

1.01 SUMMARY
A. Section includes:

1. Acrylic-Latex sealant.

2. Precast concrete joint sealant.

3. Silicone sealant.

4. Synthetic rubber sealing compound.

5. Synthetic sponge rubber filler.

6. Related materials.

1.02 REFERENCES
A. American Association of State Highway and Transportation Officials (AASHTO):

1. M198 - Standard Specification for Joints for Concrete Pipe, Manholes, and Precast Box Sections Using Preformed Flexible Joint Sealants.

B. ASTM International (ASTM):

1. C920 - Standard Specification for Elastomeric Joint Sealants.

2. C990 - Standard Specification for Joints for Concrete Pipe, Manholes, and Precast Box Sections Using Preformed Flexible Joint Sealants.

3. C1330 - Standard Specification for Cylindrical Sealant Backing for Use with Cold Liquid-Applied Sealants.

4. C1521 - Standard Practice for Evaluating Adhesion of Installed Weatherproofing Sealant Joints.

5. D412 - Standard Test Methods for Vulcanized Rubber and Thermoplastic Elastomers - Tension.

6. D624 - Standard Test Method for Tear Strength of Conventional Vulcanized Rubber and Thermoplastic Elastomer.

1.03 SUBMITTALS
A. Product data.

B. Samples, include color selections.

C. Manufacturer's Installation Instructions.

D. Warranty.

Page 1233 of 3040 ends

Joint Sealants
07900-2 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/07900 (CONFORMED)

1.04 QUALITY ASSURANCE
A. Manufacturer qualifications: Manufacturer of proposed product for minimum 5 years with satisfactory performance record.

B. Installer qualifications: Manufacturer approved installer of products similar to specified products on minimum 5 projects of similar scope as Project with satisfactory performance record.

1.05 PROJECT/SITE CONDITIONS
A. Environmental requirements: Do not apply sealant on wet or frosty surfaces or when surface temperature is higher than 100 degrees Fahrenheit or lower than recommended by the manufacturer.

1.06 DELIVERY, STORAGE, AND HANDLING
A. Deliver, store, and handle products in accordance with manufacturer's recommendations.

B. Code date packages. Do not use material older than manufacturer’s published shelf life. Store materials at temperatures lower than 80 degrees Fahrenheit. Condition materials in accordance with manufacturer’s instructions prior to installation.

1.07 SEQUENCING AND SCHEDULING
A. Caulk joints prior to painting.

1.08 WARRANTY
A. Warrant to correct defective products for minimum 1 year in accordance with manufacturer's standard warranty.

PART 2 PRODUCTS

2.01 SEALANTS
A. General:

1. Provide colors matching materials being sealed.

2. Where compound is not exposed to view in finished work, provide manufacturer's color which has best performance.

3. Nonsagging sealant for vertical and overhead horizontal joints.

4. Sealants for horizontal joints: Self-leveling pedestrian/traffic grade.

5. Joint cleaner, primer, bond breaker: As recommended by sealant manufacturer.

6. Sealant backer rod and/or compressible filler made from closed cell polyethylene, polyethylene jacketed polyurethane foam, or other flexible, nonabsorbent, non-bituminous material recommended by sealant manufacturer to:
a. Control joint depth.

Page 1234 of 3040 ends

Joint Sealants
07900-3 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/07900 (CONFORMED) b. Break bond of sealant at bottom of joint.
c. Provide proper shape of sealant bead.
d. Serve as expansion joint filler.

2.02 ACRYLIC-LATEX SEALANT
A. Permanently flexible, nonstaining, and nonbleeding latex modified acrylic sealant compound, colors as selected by Engineer from manufacturer's standard options:

1. Manufacturers: One of the following or equal:
a. Tremco, Tremflex 834.
b. Pecora Corp., Number AC-20.
c. Sonneborn, Sonolac.

2.03 PRECAST CONCRETE JOINT SEALANT
A. Preformed, cold-applied, ready-to-use, flexible joint sealant in accordance with ASTM C990 and AASHTO M 198:

1. Manufacturers: One of the following or equal.
a. Henry Corp., Ram-Nek.
b. Concrete Sealants Division, ConSeal.

2.04 SILICONE SEALANT
A. ASTM C920, Type S, Grade NS, Class 25, single component silicone sealant:

1. Manufacturers: One of the following or equal:
a. Tremco, Proglaze.
b. Pecora Corp., Number 864.
c. Dow Corning, Number 795.
d. General Electric, Number 1200 Series.

2.05 SYNTHETIC RUBBER SEALING COMPOUND
A. Manufacturer: One of the following or equal:

1. Sika Corporation, Sikaflex 2c NS or SL

2. Sika Corporation, Sikaflex 2c NS EZ Mix.

3. Pacific Polymers, Elastothane 227R.

B. Material: In accordance with ASTM C920 Type M, Grade P (pourable), Class 25 and Type M, Grade NS (non-sag), Class 25; multi-part polyurethane; able to cure at room temperature to firm, highly resilient polymer; able to perform satisfactory when continuously submerged in water or sewage and exposed to direct sunlight in dry condition; with the following properties determined at 75 degrees Fahrenheit and 50 percent relative humidity:

1. Base: Polyurethane rubber.

2. Application time: Minimum 2 hours.

3. Cure time: Maximum 3 days.

4. Tack free time: Maximum 24 hours.

5. Ultimate hardness: Non-sag 25, Pourable/SL 40, within 5 Shore A.

6. Tensile strength: Non-sag 95 pounds per square inch minimum and self-leveling minimum 170 pounds per square inch when tested in accordance with ASTM D412.

Page 1235 of 3040 ends

Joint Sealants
07900-4 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/07900 (CONFORMED)

7. Ultimate elongation: Minimum 340 percent when tested in accordance with ASTM D412.

8. Tear resistance: Non-sag 45 pounds per inch minimum and self-leveling minimum 85 pounds per inch when tested in accordance with ASTM D624, Die C.

9. Service temperature range: Minus 25 degrees to 158 degrees Fahrenheit.

C. Color: Gray to match concrete, unless indicated on the Drawings.

2.06 SYNTHETIC SPONGE RUBBER FILLER
A. Closed-cell expanded sponge rubber manufactured from synthetic polymer neoprene base, or resilient polyethylene foam backer rod. In accordance with ASTM C1330, Type C:

1. Manufacturers: The following or equal:
a. Presstite, No. 750.3 Ropax Rod Stock.

B. Characteristics:

1. Suitable for application intended.

2. Strength: As necessary for supporting sealing compound during application.

3. Resiliency: Resistance to environmental conditions of installation.

4. Bonding: No bonding to the sealing compound.

5. Structure: Cellular, prevents absorption of water.

6. Compatibility with other materials in joint and acceptance by manufacturer of sealing compound.

7. Size: Minimum 25 percent greater than nominal joint width.

2.07 RELATED MATERIALS
A. Primer: Nonstaining type, recommended by sealant manufacturer to suit application.

B. Joint cleaner: Noncorrosive, nonstaining, compatible with joint forming materials and as recommended by sealant manufacturer.

C. Bond breaker tape: Pressure-sensitive tape recommended by sealant manufacturer to suit application.

PART 3 EXECUTION

3.01 EXAMINATION
A. Verify acceptability of joint dimensions, physical, and environmental conditions.

B. Verify that surfaces are dry, clean, and free of dirt, grease, curing compound, and other residue which might interfere with adhesion of sealants.

Page 1236 of 3040 ends

Joint Sealants
07900-5 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/07900 (CONFORMED)

3.02 PREPARATION
A. Allow concrete to cure thoroughly before caulking.

B. Synthetic sponge rubber filler:

1. Prepare surfaces designated to receive filler in accordance with manufacturer's installation instructions.

2. Do not stretch filler beyond its normal length during installation.

C. Caulking:

1. Verify that surfaces are dry, clean, and free of dirt, grease, curing compounds, and other residue that might interfere with adhesion of sealant.

2. Concrete, masonry, wood, and steel surfaces: Clean and prime in accordance with manufacturer's instructions prior to caulking.

D. Synthetic rubber sealing compound:

1. Ensure surfaces to which synthetic rubber must bond are dry and free of dust, dirt, and other foreign residue.

2. Heavy sandblasted caulking groove to sound surface, and prime with manufacturer's recommended primer for particular surface.

E. For sidewalks, pavements, and similar joints sealed with elastomeric sealants and subject to traffic and other abrasion and indentation exposures, fill joints to depth equal to 75 percent of joint width, but neither more than 5/8 inches deep nor less than 3/8 inches deep.

F. For normal moving building joints sealed with elastomeric sealants not subject to traffic, fill joints to depth equal to 50 percent of joint width, but neither more than 1/2 inch deep nor less than 1/4 inch deep.

G. For joints sealed with acrylic-latex sealants, fill joints to depth in range of 75 percent to 125 percent of joint width.

H. Use joint filler to achieve required joint depths, to allow sealants to perform properly.

I. Prepare surfaces and install synthetic sponge rubber filler in accordance with manufacturer's recommendations.

J. Do not stretch filler beyond normal length during installation.

K. Apply bond breaker when recommended by joint sealer manufacturer.

3.03 INSTALLATION
A. Synthetic sponge rubber filler: Install filler in accordance with manufacturer's installation instructions.

B. Caulking, joints, and sealing:

1. Construct expansion, contraction, and construction joints as indicated on the Drawings.

2. Install pipe and conduit in structures as indicated on the Drawings.

Page 1237 of 3040 ends

Joint Sealants
07900-6 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/07900 (CONFORMED)

3. Caulk doors, windows, louvers, and other items installed in or over concrete openings inside and out.

4. Use synthetic rubber sealing compound for caulking where indicated on the Drawings or as specified, except for masonry construction and where specified otherwise.

5. Complete caulking prior to painting.

6. Verify that concrete is thoroughly cured prior to caulking.

7. When filler compressible material is used, use untreated type.

8. Apply caulking with pneumatic caulking gun.

9. Use nozzles of proper shape and size for application intended.

10. Maintain continuous bond between caulking and sides of joint to eliminate gaps, bubbles, or voids and fill joint in continuous operation without layering of compound.

11. Employ experienced applicators to caulk joints and seams in neat workmanlike manner.

12. To hasten curing of compound when used on wide joints subject to movement, apply heat with infrared lamps or other convenient means.

13. Apply synthetic rubber sealing compound with pneumatic caulking tool or other acceptable method.

3.04 CLEANING
A. Clean surfaces adjacent to sealant as work progresses.

B. Remove excess uncured sealant by soaking and scrubbing with sealant cleaning solvent.

C. Remove excess cured sealant by sanding with Number 80 grit sandpaper.

D. Leave finished work in neat, clean condition.

3.05 SCHEDULE
A. Acrylic latex:

1. Use where indicated on the Drawings.

2. Interior joints with movement less than 7.5 percent and not subject to wet conditions.

B. Silicone:

1. Use where indicated on the Drawings.

2. Joints and recesses formed where window, door, louver and vent frames, and sill adjoin masonry, concrete, stucco, or metal surfaces.

3. Door threshold bedding.

4. Moist or wet locations, including joints around plumbing fixtures.

5. Stainless steel doors and frames, including joints between applied stops and frames, and around anchor bolts.

6. Plenum joints.

C. Synthetic rubber sealing compound, non-sag Type II:

1. Use where indicated on the Drawings.

2. Water-bearing and earth-bearing concrete structures.

Page 1238 of 3040 ends

Joint Sealants
07900-7 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/07900 (CONFORMED)

3. Joints in masonry, concrete vertical surfaces, and metal-faced panels in vertical surfaces.

4. Joints between sheet metal flashing and trim.

5. Joints between sheet metal flashing and trim, and vertical wall surfaces.

6. Small voids between materials requiring filling for weathertight performance in vertical surfaces.

7. Perimeters of frames of doors, windows, louvers, and other openings where bonding is critical to airtight performance.

8. Expansion and control joints in masonry vertical surfaces.

D. Synthetic rubber sealing compound, self-leveling Type I:

1. Use where indicated on the Drawings.

2. Expansion and control joints in masonry, concrete horizontal surfaces, and metal panels in horizontal surfaces.

3. Small voids between materials requiring filling for weathertight performance in horizontal surfaces.

4. Pavement joints.

5. Perimeters of frames of doors, windows, louvers, and other openings in horizontal surfaces where bonding is critical to airtight performance.

3.06 FIELD QUALITY CONTROL
A. Adhesion testing:

1. Perform adhesion tests in accordance with ASTM C1521 per the following criteria:
a. Water bearing structures: 1 test per every 1,000 LF of joint sealed. b. Exterior precast concrete wall panels: 1 test per every 2,000 LF of joint sealed.
c. Chemical containment areas: 1 test per every 1,000 LF of joint sealed. d. Building expansion joints: 1 test per every 500 LF of joint sealed. e. All other type of joints except butt glazing joints: 1 test per every 3,000 LF of joint sealed.
f. Manufacturer's authorized factory representative provide written recommendations for remedial measures on failing tests.

END OF SECTION

Page 1239 of 3040 ends
Page 1240 of 3040 ends

Hollow Metal Doors and Frames
08110-1 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/08110 (CONFORMED) SECTION 08110

HOLLOW METAL DOORS AND FRAMES
PART 1 GENERAL

1.01 SUMMARY
A. Section includes: Steel Fire Resistive Rated and Non-Fire Resistive Rated:

1. Doors.

2. Door frames.

3. Combination door frames and window frames with mullions, muntins, and transom bars.

1.02 REFERENCES
A. American National Standards Institute (ANSI):

1. A250.6 - Hardware on Steel Doors (Reinforcement Application).

2. A250.8 - Recommended Specification for Standard Steel Doors and Frames.

B. ASTM International (ASTM):

1. A653 - Standard Specification for Sheet Steel, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process.

2. A924 - Standard Specification for General Requirements for Steel Sheet, Metallic-Coated by the Hot-Dip Process.

3. A1008 - Standard Specification for Steel, Sheet, Cold-Rolled, Carbon, Structural, High-Strength Low-Alloy, High-Strength Low-Alloy With Improved Formability, Solution Hardened, and Bake Hardenable.

4. A1011 - Standard Specification for Steel, Sheet and Strip, Hot-Rolled, Carbon, Structural, High-Strength Low-Alloy, High-Strength Low-Alloy With Improved Formability, and Ultra-High Strength.

5. E413 - Classification for Rating Sound Insulation.

C. National Association of Architectural Metal Manufacturers (NAAMM)/Hollow Metal Manufacturers Association (HMMA):

1. HMMA 861 - Guide Specifications for Commercial Hollow Metal Doors and Frames.

D. National Fire Protection Association (NFPA):

1. 80 - Standard for Fire Doors and Other Opening Protectives.

2. 252 - Standard Methods of Fire Tests of Door Assemblies.

E. Steel Door Institute (SDI):

1. SDI-111 - Recommended Details for Standard Steel Doors, Frame, Accessories and Related Components.

2. SDI-117 - Manufacturing Tolerances Standard Steel Doors and Frames.

Page 1241 of 3040 ends

Hollow Metal Doors and Frames
08110-2 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/08110 (CONFORMED) F. Underwriters’ Laboratories, Inc., (UL):

1. UL 10C - Positive Pressure Fire Tests of Door Assemblies.

2. UL 102 - Sustainability Assessment for Swinging Door Leafs.

1.03 SUBMITTALS
A. Product data.

B. Shop drawings: Show the following with references to the Engineer's door marks and hardware groups:

1. Location of door and frame types.

2. Details of fabrication, including core construction, glass lights, louvers, weatherstripping, and factory finish for each door.

3. Cutouts and reinforcements for hardware.

4. Methods of installation and anchorage to adjacent construction.

C. Certificates documenting:

1. Fire-rated units have been successfully tested as specified in this Section.

D. Manufacturer's instructions: Submit manufacturer's installation instructions.

E. Pre-Submittal Conference:

1. Conduct conference in compliance with requirements in Section 01312 - Project Meetings with attendance by representatives of Supplier, Installer.

2. Contractor to review proper methods and procedures for installing hollow metal doors and frames.

1.04 QUALITY ASSURANCE
A. Testing agency qualifications: Approved by ultimate enforcing authority for the Project; regularly engaged in inspection of materials and workmanship at factory.

1.05 DELIVERY, STORAGE, AND HANDLING
A. Before delivery, identify type and size of each door and frame in such a way that markings will not damage finish.

B. Preassemble doorframes in shop and deliver to Project site with spreader bar at sill or tie them in pairs to form box.

C. Protect doors and frames with resilient packaging sealed with heat shrunk plastic.

Break seal on-site to permit ventilation.

D. Protect doors and frames during shipment and storage to prevent warping, bending, and corrosion.

1.06 SEQUENCING AND SCHEDULING
A. Ensure timely delivery of reviewed hardware schedule and hardware templates such that no delay occurs in the work of the Contract.

Page 1242 of 3040 ends

Hollow Metal Doors and Frames
08110-3 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/08110 (CONFORMED) PART 2 PRODUCTS

2.01 MATERIALS
A. Sheet steel: ASTM A1008, commercial quality, level, cold rolled steel, or ASTM A1011, hot rolled, pickled and oil rolled steel. Galvanize by hot-dip process with zinc-coating in accordance with ASTM A924 or with ASTM A653 and the coating designation A60 or G60.

B. Clips, bolts, screws, and rivets: sized as recommended by manufacturer.

C. Primer: Rust- inhibitive epoxy primer compatible with high-solids epoxy finish coating system as specified in Section 09960 - High-Performance Coatings.

D. Touch-up materials: Primer as recommended by manufacturer.

E. Door hardware: As specified in Section 08710 - Door Hardware.

F. Grout: As specified in Section 04220 - Concrete Unit Masonry.

2.02 DOOR AND FRAME TYPES
A. Interior doors: ANSI 250.8, Grade III, Model 3 or NAAMM HMMA 810 Type A and NAAMM HMMA 861, flush steel rib-stiffened, minimum 18-gauge face sheets.

B. Exterior doors: ANSI 250.8, Grade III, Model 3, or NAAMM HMMA 810 Type A and NAAMM HMMA 861, flush steel rib-stiffened, minimum 16-gauge face sheets.

C. Interior frames: ANSI 250.8 or NAAMM HMMA 861, fully welded frames, minimum 16-gauge, sizes and shapes as indicated on the Drawings.

D. Exterior frames: ANSI 250.8 or NAAMM HMMA 861, fully welded frames HMMA 861, except minimum 14-gauge sizes and shapes as indicated on the Drawings.

2.03 FABRICATION OF FRAMES
A. Galvanize all frames installed in exterior openings.

B. Frames: Sheet steel, integral type, welded continuous to full depth of frames with minimum 5/8-inch deep stops, unless otherwise indicated on the Drawings.

C. Hardware reinforcements: Fabricate according to SDI A250.6 with reinforcing plates from same material as door face sheets.

D. Jamb Anchors: As required for adjacent wall construction, minimum 3 per jamb, unless otherwise indicated on the Drawings.

E. Floor anchors: Fixed type, except where adjustable anchors are indicated on the Drawings, 1 per jamb, with minimum 2 holes for anchorage. Where floor fill occurs,

Page 1243 of 3040 ends

Hollow Metal Doors and Frames
08110-4 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/08110 (CONFORMED) terminate bottom of frames at indicated finished floor level and support by adjustable extension clips resting on and anchored to structural slabs.

F. Anchors at masonry: Adjustable strap and stirrup, minimum 16-gauge corrugated or perforated steel at maximum of 30 inches on center and extending minimum 8 inches into masonry.

G. Anchors at previously placed concrete: Countersink machine screws through the frame into expansion devices spaced at maximum 30 inches on center.

H. Anchors at structural steel framing: Welded or otherwise securely fastened with stainless steel screws.

I. Anchors for fire resistive frames: Conform to requirements of labeling authority having jurisdiction.

J. Masonry angle stiffeners: Factory welded into heads of frames for installation in openings more than 48 inches wide.

K. Mullions, muntins, and transom bars: Minimum 18-gauge, tubular sheet steel matching, and butt-welded to head and jamb members.

L. Removable stops: Fasten at approximately 12 to 16 inches on center.

2.04 FABRICATION OF DOORS
A. Galvanize all doors installed in exterior openings.

B. Reinforce face sheets with steel rib stiffeners, spaced at maximum 6 inches apart, and securely attached to face sheets by spot welds at maximum 5 inches on center.

C. Fill voids between face sheets and stiffeners with fiberglass insulation having a minimum density of 0.8 pounds per cubic foot.

D. Edges: Full weld without visible joints. Bevel striking edge 1/8 inch in 2 inches.

E. Door cores:

1. Stiffeners: Vertical steel ribs formed from minimum 22-gauge plain sheet steel, spaced at maximum 6 inches apart and securely attached to face sheets by spot welds at maximum 5 inches on center.

2. Core fillers: Insulation, minimum 0.60 pound density noncombustible type, installed in spaces between stiffeners for full height of door; labeled door core material shall conform to requirements of labeling authority.

F. Tops and bottoms of doors: Close with continuous recess steel channel of minimum 16-gauge, extending full width of door and spot welded to both faces.

G. Tops and bottoms of exterior doors: Flush closing channels welded to make tops and bottoms waterproof with weep holes for escape of moisture.

H. Hardware reinforcements: Fabricate according to SDI A250.6 with reinforcing plates from same material as door face sheets.

Page 1244 of 3040 ends

Hollow Metal Doors and Frames
08110-5 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/08110 (CONFORMED) I. Astragals:

1. Install on active leaf of double doors in accordance with UL listing requirements for fire resistive ratings as indicated on the Drawings, and for exterior pairs of doors.

2. Do not install on doors swinging in pairs with rating of 90 minutes or less in means of egress where both leaves are required to provide building code required exiting widths.

3. Do not provide astragal cutouts for hardware operations.

J. Astragal clearances for fire resistive rated doors:

1. Door bottoms at doors designated to receive non-combustible threshold: Not to exceed 3/8 inch between threshold and door bottom.

2. Door bottoms where there is no threshold: Maximum clearance between door and floor not to exceed 1/2 inch.

3. Door bottoms at doors designated to receive combustible floor coverings: Not to exceed 1/2 inch between floor covering and door bottom.

4. Clearance between door and frame and between meeting edges of pairs of doors: Not to exceed 1/8 inch.

K. Astragal clearances for non-fire resistive rated doors: Same as fire resistive rated doors, unless otherwise indicated on the Drawings.

2.05 FABRICATION OF FIRE RATED DOORS AND FRAMES
A. Fabricate to meet requirements of the building code as specified in Section 01410 - Regulatory Requirements, UL 10C, UL 102, and NFPA 252, except hose stream test shall not be required for opposite swing double egress exit doors and for doors of fire endurance rating of less than 45 minutes with or without approved glass lites.

B. Temperature rise requirements of doors at exit enclosures and exit passageways:

Maximum transmitted temperature end point of less than 450 degrees Fahrenheit above ambient at end of 30 minutes when tested in accordance with the building code as specified in Section 01410 - Regulatory Requirements.

C. Apply approved testing agency labels on fire rated doors and frames.

D. Fabricate oversized fire rated doors in accordance with requirements for ratings indicated on the Drawings.

2.06 ACCESSORIES
A. Mullions and transom bars: Join to adjacent members by welding or rigid mechanical anchors.

B. Grout guards: Formed from same material as frames, not less than 0.016 inches thick.

C. Silencers:

1. Drill single leaf doorframe jamb stops for minimum 3 silencers.

2. Drill double-leaf doorframe head stops for minimum 2 silencers.

3. Do not drill doorframes for silencers when weatherstripping is to be installed.

Page 1245 of 3040 ends

Hollow Metal Doors and Frames
08110-6 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/08110 (CONFORMED)

2.07 FINISHING
A. Thoroughly clean surfaces of oil, grease, and other impurities; touch-up abraded galvanizing; and chemically etch.

B. Fill irregularities and sand smooth finish surface. Apply 1 coat of manufacturer's standard rust inhibitive baked-on primer.

C. Finish painting: High solids epoxy polyurethane system:

1. Interior doors in non-corrosive environment: As specified in Section 09910 - Painting.

2. Exterior doors and interior doors in corrosive environments: As specified in Section 09960 - High-Performance Coatings.

PART 3 EXECUTION

3.01 EXAMINATION
A. Examine reviewed hardware schedules and verify proper coordination of hardware and doors and frames.

B. Examine opening locations and verify the following:

1. Correctness of dimensions, backing, or support conditions.

2. Absence of defects that would adversely affect frame or door installation.

3.02 INSTALLATION
A. Install doors and frames in accordance with approved shop drawings and manufacturer's instructions.

B. Frames:

1. Set accurately in position, plumb, align, and attach securely to structure.

2. Set in place before construction of adjacent masonry or framed walls.

3. Anchor frames to previously placed concrete.

4. Set frames before removing spreader bars.

5. Fully grout frames in masonry as the Work progresses.

6. Grout frames at concrete through keyways provided at head and jambs.

C. Doors:

1. Install at correct openings, ensure smooth swing and proper closure with frame.

D. Fire resistive frames and doors:

1. Install to conform to NFPA 80 for fire resistive rated class as indicated on the Drawings.

Page 1246 of 3040 ends

Hollow Metal Doors and Frames
08110-7 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/08110 (CONFORMED) E. Door hardware:

1. Install in accordance with Section 08710 - Door Hardware.

2. Drill and tap doors and frames to receive non-template, mortised, and surface-mounted door hardware.

F. Separate or isolate dissimilar metals with neoprene gaskets, sleeves, and washers, or with coatings acceptable to the Engineer.

3.03 TOLERANCES
A. Manufacturing and installation tolerances: As indicated on the Drawings or in conformance to SDI 117 as minimum.

3.04 ADJUSTING AND CLEANING
A. Prime coat touch-up: Immediately after installation, sand smooth and touch-up rust areas, and other areas where primer has been damaged, with prime touch-up paint.

B. Make adjustments as required for correct, proper, and free function and smooth operation without binding of hardware or doors and frames.

C. Protect doors and frames from damage to surface or profile.

END OF SECTION

Page 1247 of 3040 ends
Page 1248 of 3040 ends

Floor Access Doors
08320-1 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/08320 (CONFORMED) SECTION 08320

FLOOR ACCESS DOORS
PART 1 GENERAL

1.01 SUMMARY
A. Section includes: Non-fire-rated floor access doors.

1.02 REFERENCES
A. American Association of State Highway and Transportation Officials (AASHTO):

1. Standard Specifications for Highway Bridges.

B. Occupational Safety and Health Administration (OSHA):

1. 29 CFR 1910-Occupational Safety and Health Standards.

1.03 SUBMITTALS
A. Product data.

B. Shop drawings that include the following:

1. Floor access door installation recommendations.

2. Locations of floor access doors.

3. Door size and configuration.

4. Live load capacity.

5. Materials of construction and finishes provided.

1.04 DELIVERY, STORAGE, AND HANDLING
A. Identify type and size of each floor access door in way not to damage finish prior to delivery.

B. Deliver products only after proper facilities are available.

C. Deliver and store packaged products in original containers with seals unbroken and labels intact until time of use.

D. Handle carefully to prevent damage and store on clean concrete surface or raised platform in safe, dry area.

1. Do not dump onto ground.

E. Protect floor access doors during shipment and storage to prevent warping, bending, and corrosion.

1.05 WARRANTY
A. Provide manufacturer’s warranty against defects in material and workmanship for a period of 5 years.

Page 1249 of 3040 ends

Floor Access Doors
08320-2 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/08320 (CONFORMED)

1.06 MAINTENANCE
A. Deliver 2 keys for each cylinder lock to Owner.

PART 2 PRODUCTS

2.01 MEDIUM-DUTY FLOOR ACCESS DOORS
A. Manufacturers: One of the following or equal:

1. The Bilco Co., Model J or JD (double leaf).

2. Babcock Davis Associates, Inc., Model BFDDP-SAL or BFDDP-DAL (double leaf).

B. Style: Single leaf or double leaf as indicated on the Drawings, steel, capable of withstanding minimum live load of 300 pounds per square foot, channel frame, with drainage couplings.

C. Door leaf: Minimum 1/4-inch, diamond-pattern plate reinforced with stiffeners as required to meet specified live load.

D. Frame: 1/4-inch channel with anchor flange around perimeter.

E. Hardware:

1. Hinges: Each leaf equipped with a minimum of 2 heavy forged-brass hinges with stainless steel pins.

2. Lock: Snap lock with removable handle mounted on door leaf.

3. Grip handle: Provide vinyl grip handle designed to release cover for closing.

4. Operating mechanism: Spring operators designed for ease of operation and automatic hold-open arm with release handle.

5. Drainage assembly: Provide 1-1/2-inch drainage coupling located in corner of the channel frame.

2.02 FINISHES
A. Floor access door finishes:

1. Aluminum: Manufacturer's standard mill finish.

2. Aluminum in contact with dissimilar metals and concrete: Manufacturer's standard bituminous coating.

3. Steel: Manufacturer's standard red oxide primer.

B. Hardware finishes:

1. Provide optional Type 316 stainless steel hardware throughout, including parts of the latch and lifting mechanism assemblies, hold-open arms, and all brackets, hinges, pins, and fasteners.

Page 1250 of 3040 ends

Floor Access Doors
08320-3 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/08320 (CONFORMED) PART 3 EXECUTION

3.01 EXAMINATION
A. Examine construction to receive floor access door and verify correctness of dimensions and other supporting or adjoining conditions.

3.02 PREPARATION
A. Coordinate details with other work supporting, adjoining, or requiring floor access doors.

B. Verify dimensions and profiles for each opening.

C. Verify that location will serve portion of work to which access is required.

1. Where proposed functional location conflicts with other work, notify the Engineer before installation.

D. Apply coating to aluminum surfaces that will be in contact with dissimilar metals or concrete when there is none.

3.03 INSTALLATION
A. Install floor access doors in accordance with manufacturer's instructions.

B. Ensure correct types and adequate sizes at proper locations.

C. Securely attach frames to supporting work and ensure doors, frames, and hardware operate smoothly and are free from warp, twist, and distortion.

3.04 ADJUSTING
A. Adjust doors, frames, and hardware to operate smoothly, freely, and properly without binding.

3.05 CLEANING
A. Thoroughly clean surfaces of grease, oil, or other impurities; touch up abraded prime coat where applicable.

END OF SECTION

Page 1251 of 3040 ends
Page 1252 of 3040 ends

Door Hardware
08710-1 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/08710 (CONFORMED) SECTION 08710

DOOR HARDWARE
PART 1 GENERAL

1.01 SUMMARY
A. Section includes: Door hardware.

1.02 REFERENCES
A. Builders Hardware Manufacturers Association (BHMA):

1. A156.1 - Butts and Hinges.156.2 - Bored and Preassembled Locks and Latches.

2. A156.3 - Exit Devices.

3. A156.4 - Door Controls.

4. A156.13 - Mortise Locks and Latches.

5. A156.14 - Sliding and Folding Door Hardware.

6. A156.16 - Auxiliary Hardware.

7. A156.18 - Materials and Finishes.

8. A156.23 - Electromagnetic Locks.

9. A156.26 - Continuous Hinges.

10. A156.31 - Electric Strikes and Frame Mounted Actuators.

11. A156.36 - Auxiliary Locks.

B. International Building Code (ICC):

1. A117.1 - Accessible and Usable Buildings and Facilities.

C. National Fire Protection Association (NFPA):

1. 80 - Fire Doors and Windows.

2. 105 - Installation of Smoke Door Assemblies.

3. 252 - Standard Methods of Fire Tests of Door Assemblies.

D. Underwriters Laboratories, Inc. (UL):

1. 10C - Positive Pressure Fire Tests of Door Assemblies.

2. 1784 - Standard for Air Leakage Tests of Door Assemblies and Other Opening Protectives.

1.03 SUBMITTALS
A. Product data:

1. Manufacturer's product data sheets including installation details, material descriptions, dimensions of individual components and profiles, operational descriptions and finishes.

2. Product Test Reports: Indicating compliance with cycle testing requirements, based on evaluation of comprehensive tests performed by manufacturer and witnessed by a qualified independent testing agency.

Page 1253 of 3040 ends

Door Hardware
08710-2 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/08710 (CONFORMED) B. Hardware schedule:

1. Include references to Engineer's hardware group number, door type designations, locations, other pertinent data, and manufacturer names or suitable abbreviation opposite items scheduled.

2. Prepared by or under the supervision of supplier, detailing fabrication and assembly of door hardware, as well as procedures and diagrams. Coordinate the final Door Hardware Schedule with doors, frames, and related work to ensure proper size, thickness, hand, function, and finish of door hardware. a. Format: Comply with scheduling sequence and vertical format in DHI's "Sequence and Format for the Hardware Schedule."
b. Organization:
1) Organize the Door Hardware Schedule into door hardware sets indicating complete designations of every item required for each door or opening.
2) Organize door hardware sets in same order as in the Door Hardware Sets at the end of this Section.
3) Submittals that do not follow the same format and order as the Door Hardware Sets will be rejected and subject to resubmission. c. Content: Include the following information:
1) Type, style, function, size, label, hand, and finish of each door hardware item.
2) Manufacturer of each item.
3) Fastenings and other pertinent information.
4) Location of door hardware set, cross-referenced to Drawings, both on floor plans and in door and frame schedule.
5) Explanation of abbreviations, symbols, and codes contained in schedule.
6) Mounting locations for door hardware.
7) Door and frame sizes and materials.
8) Warranty information for each product.
d. Submittal Sequence:
1) Submit the final Door Hardware Schedule at earliest possible date, particularly where approval of the Door Hardware Schedule must precede fabrication of other work that is critical in the Project construction schedule.
2) Include Product Data, Samples, Shop Drawings of other work affected by door hardware, and other information essential to the coordinated review of the Door Hardware Schedule.

C. Keying schedule:

1. After a keying meeting with the owner has taken place prepare a separate keying schedule detailing the final instructions.

2. Submit the keying schedule in electronic format.

3. Include keying system explanation, door numbers, key set symbols, hardware set numbers and special instructions.

4. Owner must approve submitted keying schedule prior to the ordering of permanent cylinders/cores.

D. Samples: Include for each different type and manufacturer for review of finish.

E. Construction key distribution list: Submit upon Owner's request.

Page 1254 of 3040 ends

Door Hardware
08710-3 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/08710 (CONFORMED) F. Templates:

1. Furnish hardware templates to fabricators of doors, frames, and other work to be factory-prepared for hardware.

2. Check shop drawings of other work to confirm that adequate hardware backing is available.

G. Project record documents: Include corrected hardware schedule.

H. Operating and Maintenance Manuals:

1. Provide manufacturers operating and maintenance manuals for each item comprising the complete door hardware installation.

2. As specified in Section 01782 - Operation and Maintenance Manuals.

1.04 REGULATORY REQUIREMENTS
A. Provide hardware for fire-resistive rated openings that complies with UL and listed by UL.

1.05 DELIVERY, STORAGE, AND HANDLING
A. Deliver hardware where directed in unopened packages with items packed separately, complete and ready for installation with necessary fittings, trim, fasteners, and accessories.

B. Provide packages bearing the manufacturers' labels with each item or group of items identified according to the accepted hardware schedule.

1.06 QUALITY ASSURANCE
A. Certified products: Where specified, products must maintain a current listing in the Builders Hardware Manufacturers Association (BHMA) Certified Products Directory (CPD).

B. Installer qualifications: A minimum 3 years documented experience installing both standard and electrified door hardware similar in material, design, and extent to that indicated for this Project and whose work has resulted in construction with a record of successful in-service performance.

C. Door hardware supplier qualifications:

1. Experienced commercial door hardware distributors with a minimum 5 years documented experience supplying both mechanical and electromechanical hardware installations comparable in material, design, and extent to that indicated for this Project.

2. Supplier recognized as a factory direct distributor by the manufacturers of the primary materials with a warehousing facility in Project's vicinity.

3. Supplier to have on staff a certified Architectural Hardware Consultant (AHC) available during the course of the Work to consult with Contractor, Architect, and Owner concerning both standard and electromechanical door hardware and keying.

Page 1255 of 3040 ends

Door Hardware
08710-4 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/08710 (CONFORMED) D. Source limitations: Obtain each type and variety of door hardware specified in this section from a single source unless otherwise indicated.

1. Electrified modifications or enhancements made to a source manufacturer's product line by a secondary or third party source will not be accepted.

E. Each unit to bear third party permanent label demonstrating compliance with the referenced standards.

F. Pre-submittal conference:

1. Conduct coordination conference in compliance with requirements in Section 01312 - Project Meetings with attendance by representatives of Supplier(s), Installer(s), and Contractor(s) to review proper methods and the procedures for receiving, handling, and installing door hardware.

2. Prior to installation of door hardware, conduct a project specific training meeting to instruct the installing contractors' personnel on the proper installation and adjustment of their respective products.

3. Product training to be attended by installers of door hardware (including electromechanical hardware) for aluminum, hollow metal and wood doors.

Training will include the use of installation manuals, hardware schedules, templates and physical product samples as required.

4. Inspect and discuss electrical roughing-in, power supply connections, and other preparatory work performed by other trades.

5. Review sequence of operation narratives for each unique access controlled opening.

6. Review and finalize construction schedule and verify availability of materials.

7. Review the required inspecting, testing, commissioning, and demonstration procedures.

1.07 MAINTENANCE
A. Require lockset manufacturers to deliver permanent removable cylinder cores and keys and minimum 2 extractor keys to Owner directly.

1.08 SCHEDULING AND SEQUENCING
A. Upon receipt of accepted hardware schedule, coordinate accepted hardware schedule, templates, reinforcing units, and template instructions to door and frame sections.

B. Restrict distribution of construction keys to superintendents and foremen. Maintain record of persons who have received keys on construction distribution list.

1.09 MAINTENANCE TOOLS AND INSTRUCTIONS
A. Furnish a complete set of specialized tools and maintenance instructions as needed for Owner's continued adjustment, maintenance, and removal and replacement of door hardware.

Page 1256 of 3040 ends

Door Hardware
08710-5 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/08710 (CONFORMED)

1.10 WARRANTY
A. Provide warranty as specified in Section 01783 - Warranties and Bonds.

1. Written warranty, executed by manufacturer(s), agreeing to repair or replace components of standard and electrified door hardware that fails in materials or workmanship within specified warranty period after final acceptance by the Owner. Failures include, but are not limited to, the following:
a. Structural failures including excessive deflection, cracking, or breakage. b. Faulty operation of the hardware.
c. Deterioration of metals, metal finishes, and other materials beyond normal weathering.
d. Electrical component defects and failures within the systems operation.

B. Special warranty:

1. Duration for electromechanical door hardware: 2 years.

2. Duration for standard duty cylindrical (bored) locks and latches: 5 years.

3. Duration for exit hardware: 5 years.

4. Duration for mortise locks and latches: 10 years.

5. Duration for manual overhead door closer bodies: 10 years.

6. Duration for heavy duty floor closers: 10 years.

PART 2 PRODUCTS

2.01 GENERAL
A. Door hardware includes, but is not necessarily limited to, the following:

1. Mechanical door hardware.

2. Electromechanical door hardware.

3. Automatic operators.

4. Cylinders.

2.02 FASTENERS
A. Types:

1. To concrete, marble, or masonry: Machine screws and flush shells.

2. To wood: Wood screws.

3. On gypsum board or plaster: Screws of sufficient length to provide solid connection to framing or backing behind gypsum board or plaster.

4. To mineral and hollow core doors: Hex bolts.

5. Of exit devices to doors: Thru-bolts, unless otherwise specified.

B. Screws exposed: Phillips-head type, full-threaded screws, not combination type.

C. Sizes: Suitable for heavy use.

D. Finish: Stainless steel, unless otherwise required to match material and hardware finish.

Page 1257 of 3040 ends

Door Hardware
08710-6 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/08710 (CONFORMED)

2.03 HANGING DEVICES
A. Hinges: BHMA A156.1 certified butt hinges with number of hinge knuckles and other options as specified in the Door Hardware Sets.

1. Quantity: Provide the following hinge quantity:
a. 2 Hinges: For doors with heights up to 60 inches.
b. 3 Hinges: For doors with heights 61 to 90 inches.
c. 4 Hinges: For doors with heights 91 to 120 inches.
d. For doors with heights more than 120 inches, provide 4 hinges, plus 1 hinge for every 30 inches of door height greater than 120 inches. e. Hinge size: Provide the following, unless otherwise indicated, with hinge widths sized for door thickness and clearances required:
1) Widths up to 3 feet 0 inches: 4-1/2 inches standard or heavy weight as specified.
2) Sizes from 3 feet 1inch to 4 feet 0 inches: 5 inches standard or heavy weight as specified.
f. Hinge weight and base material: Unless otherwise indicated, provide the following:
1) Exterior doors: Heavy weight, non-ferrous, ball bearing or oil impregnated bearing hinges unless Hardware Sets indicate standard weight.
2) Interior doors: Standard weight, steel, ball bearing or oil impregnated bearing hinges unless Hardware Sets indicate heavy weight. g. Hinge options: Comply with the following:
1) Non-removable pins: Provide set screw in hinge barrel that, when tightened into a groove in hinge pin, prevents removal of pin while door is closed; for the all out-swinging lockable doors. h. Manufacturers: One of the following or equal:
1) Hager Companies (HA).
2) Ives (IV).
3) McKinney Products; ASSA ABLOY Architectural Door Accessories (MK).

2.04 MECHANICAL LOCKS AND LATCHING DEVICES
A. Mortise Locksets, Grade 1 (Heavy Duty): BHMA A156.13, Series 1000, Operational Grade 1 Certified Products Directory (CPD) listed. Locksets are to be manufactured with a corrosion resistant steel case and be field-reversible for handing without disassembly of the lock body.

1. Manufacturers: One of the following or equal:
a. Corbin Russwin Hardware (RU) – ML2000 Series.
b. Sargent Manufacturing (SA) – 8200 Series.
c. Schlage (SC) – L9000 Series.

B. Cylindrical Locksets, Grade 1 (Heavy Duty): BHMA A156.2, Series 4000, Operational Grade 1 Certified Products Directory (CPD) listed.

1. Furnish with solid cast levers, standard 2-3/4 inch backset, and 1/2 inch (3/4 inch at rated paired openings) throw brass or stainless steel latchbolt.

2. Locks are to be non-handed and fully field reversible.

Page 1258 of 3040 ends

Door Hardware
08710-7 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/08710 (CONFORMED)

3. Manufacturers: One of the following or equal:
a. Corbin Russwin Hardware (RU) - CL3300 Series.
b. Sargent Manufacturing (SA) - 10 Line.
c. Schlage (SC) - ND Series.

2.05 LOCK AND LATCH STRIKES
A. Strikes: Provide manufacturer's standard strike with strike box for each latch or lock bolt, with curved lip extended to protect frame, finished to match door hardware set, unless otherwise indicated, and as follows:

1. Flat-lip strikes: For locks with 3-piece antifriction latch-bolts, as recommended by manufacturer.

2. Extra-long-lip strikes: For locks used on frames with applied wood casing trim.

3. Aluminum-frame strike box: Provide manufacturer's special strike box fabricated for aluminum framing.

4. Double-lipped strikes:
a. For locks at double acting doors.
b. Furnish with retractable stop for rescue hardware applications.

B. Standards: Comply with the following:

1. Strikes for Mortise Locks and Latches: BHMA A156.13.

2. Strikes for Bored Locks and Latches: BHMA A156.2.

3. Strikes for Auxiliary Deadlocks: BHMA A156.36.

4. Dustproof Strikes: BHMA A156.16.

2.06 CONSTRUCTION KEYING
A. Type: Removable core system.

2.07 PERMANENT CYLINDERS AND KEYING
A. Manufacturers: One of the following or equal:

1. Corbin Russwin Hardware (RU).

2. Sargent Manufacturing (SA).

3. Schlage (SC).

B. Cylinders: Original manufacturer cylinders complying with the following:

1. Mortise type: Threaded cylinders with rings and cams to suit hardware application.

2. Rim type: Cylinders with back plate, flat-type vertical or horizontal tailpiece, and raised trim ring.

3. Bored-lock type: Cylinders with tailpieces to suit locks.

4. Mortise and rim cylinder collars to be solid and recessed to allow the cylinder face to be flush and be free spinning with matching finishes.

5. Keyway: Manufacturer’s Standard. Match Facility Standard.

C. Removable cores: Provide removable cores as specified, core insert, removable by use of a special key, and for use with only the core manufacturer's cylinder and door hardware.

Page 1259 of 3040 ends

Door Hardware
08710-8 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/08710 (CONFORMED) D. Keying system: Each type of lock and cylinders to be factory keyed.

1. Supplier shall conduct a "Keying Conference" to define and document keying system instructions and requirements.

2. Furnish factory cut, nickel-silver large bow permanently inscribed with a visual key control number as directed by Owner.

3. New system: Key locks to a new key system as directed by the Owner.

E. Key quantity: Provide the following minimum number of keys:

1. Change keys per cylinder: 2.

2. Master keys (per master key level/group): 5.

3. Construction control keys (where required): 2.

4. Permanent control keys (where required): 2.

F. Construction keying: Provide temporary keyed construction cores.

G. Key registration list (biting list):

1. Provide keying transcript list to Owner's representative in the proper format for importing into key control software.

2. Provide transcript list in writing or electronic file as directed by the Owner.

2.08 PUSH/PULL PLATES
A. Manufacturers: One of the following or equal:

1. Ives.

2. Trimco.

3. Rockwood.

B. Pulls:

1. Material: As scheduled.

2. Size: Minimum 8 inches center to center, minimum grip diameter of 3/4 inch, minimum projection of 2-1/4 inch.

C. Pull plates:

1. Material: As scheduled.

2. Plate size: Minimum 3 by 12 inches by 0.050-inch thick, with beveled edges on 4 sides with pull.

3. Pull size: Minimum 8 inches center to center, minimum grip diameter of 3/4 inch, minimum projection of 2-1/4 inch.

D. Push plates:

1. Material: As scheduled.

2. Size: Minimum 3 by 12 inches by 0.050-inch thick, with beveled edges on 4 sides.

2.09 CLOSERS
A. Manufacturers:

1. Features:
a. Heavy-duty.
b. Non-handed and non-sized.
c. Adjustable spring power from size 1 through 4.

Page 1260 of 3040 ends

Door Hardware
08710-9 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/08710 (CONFORMED)

2. One of the following or equal:
a. Sargent, 351 Series.
b. LCN, Super Smoothee Model 4041 Series.
c. Norton Door Controls, Multi-Size Door Closers Model 7500BF Series.

B. Type: Full rack and pinion type with steel spring and non-gumming, non-freezing hydraulic fluid.

C. Controls: Separate set for regulating sweep speed, latch speed, backcheck and backcheck positioning, or where schedules, spring power.

D. Sizes: As recommended by accepted manufacturer.

E. Covers: Metal, capable of receiving finishes to match adjacent hardware finishes, unless otherwise specified.

F. Narrow frame provisions: Drop plates.

G. Effort to operate: As follows:

1. Exterior: Maximum 8-1/2 pounds.

2. Interior: Maximum 5 pounds.

3. Fire-resistive rated doors: Maximum 15 pounds.

H. Adjust closers in accordance with manufacturer's directions for size of door.

2.10 EXIT DEVICES
A. Lever design:

1. Manufacturers: The following or equal:
a. Von Duprin, Lever Model 06.

B. Rim device, non-fire resistive rated:

1. Manufacturers: One of the following or equal:
a. Von Duprin Inc., Model Series 98.
b. Sargent Essex Ind., Model Series 8800.

C. Rim device, fire-resistive rated:

1. Manufacturers: One of the following or equal:
a. Von Duprin Inc., Model Series 98-F.
b. Sargent Essex Ind., Model Series 12-8800.

D. Mortise lock device, non-fire-resistive rated:

1. Manufacturers: The following or equal:
a. Von Duprin Inc., Model Series 9875L.

E. Mortise lock device, fire-resistive rated:

1. Manufacturers: The following or equal:
a. Von Duprin Inc., Model Series 9875L-F.

Page 1261 of 3040 ends

Door Hardware
08710-10 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/08710 (CONFORMED) F. Material: As scheduled.

G. Corrosive environment provisions: Zinc dichromate coated internal parts.

2.11 MISCELLANEOUS DOOR HARDWARE
A. Wall stops: As scheduled.

1. Manufacturers: One of the following or equal:
a. Ives.
b. Trimco.
c. Rockwood.

B. Floor stops: As scheduled with strike of suitable height to compensate for clearance between door and floor.

1. Manufacturers: One of the following or equal:
a. Ives.
b. Trimco.
c. Rockwood.

C. Mechanical holders: Foot-operated plunger with instant release by touch of toe and integral spring to keep constant shoe pressure against floor; brass.

1. Manufacturers: The following or equal:
a. Glynn-Johnson.

D. Electromagnetic holders: Electromagnetic hold open device; able to be connected to smoke alarm system; UL BHMA listed; consisting of completely flush wall-mounted electro-magnetic holder and door thru-bolted contact plate; depth as required; with minimum holding force of 25 and maximum of 40 pounds; voltage and mounting height as indicated on the Drawings; steel.

1. Manufacturers: One of the following or equal:
a. Rixson-Firemark Inc., Electromagnetic Door Release Model 990 Series. b. LCN Electromagnetic Door Release Model SEM 7800 Series. c. Dorma Door Controls Inc., Electromagnetic Door Holder Model Series EM.

E. Flush bolts and surface bolts:

1. BHMA A156.3 and A156.16, Grade 1, certified.
a. Flush bolts to be furnished with top rod of sufficient length to allow bolt retraction device location approximately 6 feet from the floor. b. Furnish dust proof strikes for bottom bolts.
c. Surface bolts to be minimum 8 inches in length, UL listed for labeled fire doors, and UL listed for windstorm components where applicable. d. Provide related accessories (mounting brackets, strikes, coordinators, etc.) as required for appropriate installation and operation. e. Manufacturers: One of the following or equal:
1) Ives (IV).
2) Rockwood Products; ASSA ABLOY Architectural Door Accessories (RO).
3) Trimco (TC).

Page 1262 of 3040 ends

Door Hardware
08710-11 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/08710 (CONFORMED) F. Kick plates:

1. As scheduled, 0.050-inch thick, beveled edges, 10 inches high, 1-1/2 inches narrower than single doors, 1 inch narrower than leaf of door pairs.

2. Manufacturers: One of the following or equal:
a. Ives.
b. Trimco.

G. Architectural seals:

1. General:
a. Thresholds, weatherstripping, and gasket seals to be of type and design as specified below or in the Hardware Sets.
b. Provide continuous weatherstrip gasketing on exterior doors and provide smoke, light, or sound gasketing on interior doors where indicated. c. At exterior applications provide non-corrosive fasteners and elsewhere where indicated.

2. Smoke labeled gasketing:
a. Assemblies in accordance with NFPA 105 that are listed and labeled by a testing and inspecting agency acceptable to authorities having jurisdiction, for smoke control ratings indicated, based on testing in accordance with UL 1784.
b. Provide smoke labeled perimeter gasketing at all smoke labeled openings.

3. Fire labeled gasketing:
a. Assemblies in accordance with NFPA 80 that are listed and labeled by a testing and inspecting agency acceptable to authorities having jurisdiction, for fire ratings indicated, based on testing in accordance with UL 10C. b. Provide intumescent seals as indicated to meet UL 10C, and NFPA 252.

4. Sound-rated gasketing:
a. Assemblies that are listed and labeled by a testing and inspecting agency, for sound ratings indicated.

5. Replaceable seal strips:
a. Provide only those units where resilient or flexible seal strips are easily replaceable and readily available from stocks maintained by manufacturer.

6. Manufacturers: One of the following or equal:
a. National Guard Products (NG).
b. Pemko Products; ASSA ABLOY Architectural Door Accessories (PE). c. Zero (ZE).

H. Thresholds:

1. As scheduled, extruded aluminum, maximum 1/2-inch high, maximum slope of 1 foot in 2 feet.

2. Manufacturers: One of the following or equal:
a. National Guard Products Inc.
b. Pemko Mfg. Co.

I. Dustproof strike:

1. As scheduled.

2. Manufacturers: One of the following or equal:
a. Ives.
b. Trimco.

Page 1263 of 3040 ends

Door Hardware
08710-12 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/08710 (CONFORMED) J. Coordinator with filler bar:

1. As scheduled, non-handed, series type length as required for door sizes indicated, complete with filer lengths as required, with mounting brackets and carry bars when required for proper operation; steel with manufacturer's standard prime finish capable of receiving painted finish.

2. Manufacturers: One of the following or equal:
a. Glynn-Johnson Coordinators, Model COR Series.
b. Ives, Door Co-Ordinator, Model 900 Series.

K. Door bottoms:

1. As scheduled, extruded aluminum with vinyl insert, surface mounted, length equal to door width minus 2 inches, automatic, recessed in bottom of door.

2. Manufacturers: One of the following or equal:
a. Pemko.
b. Reese.

L. Astragals:

1. As specified in Sections 08110 - Hollow Metal Doors and Frames.

M. Silencers:

1. As scheduled, pneumatic gray rubber.

2. Manufacturers: One of the following or equal:
a. Trimco.
b. Ives.
c. Rockwood.

2.12 FINISHES
A. Brass and bronze: BHMA A156.18 626 (US26D), satin chrome.

B. Steel: BHMA A156.18 652 (US26D), satin chrome.

C. Stainless steel: BHMA A156.18 630 (US32D), satin stainless steel.

D. Aluminum: BHMA A156.18 628 (US28).

E. Plastic closer covers: Spray paint to match typical door hardware finish.

F. Metal closer covers: Plate covers to match typical door hardware finish.

G. Electromagnetic hold open devices: Manufacturer's standard brushed zinc finish.

PART 3 EXECUTION

3.01 EXAMINATION
A. Inspect doors and door frames for damage or defects and examine hardware for compatibility with receiving conditions and suitable to intended use.

B. Verify that required wall backing has been installed.

Page 1264 of 3040 ends

Door Hardware
08710-13 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/08710 (CONFORMED)

3.02 INSTALLATION
A. Install finish hardware in accordance with manufacturer's templates and instructions.

1. Install each item of mechanical and electromechanical hardware and access control equipment to comply with manufacturer's written instructions and according to specifications.

2. Installers are to be trained and certified by the manufacturer on the proper installation and adjustment of fire, life safety, and security products including:

Hanging devices; locking devices; closing devices; and seals.

B. Accurately and properly fit hardware.

C. Securely fasten fixed parts for smooth, trouble-free, non-binding operation.

D. Fit faces of mortise parts snug and flush.

E. Ensure that operating parts move freely and smoothly without binding, sticking, or excessive clearance.

F. Mounting heights:

1. Mount door hardware units at heights indicated in following applicable publications, unless specifically indicated or required to comply with governing regulations:

2. Standard steel doors and frames: DHI's "Recommended Locations for Architectural Hardware for Standard Steel Doors and Frames."

3. Wood doors: DHI WDHS.3, "Recommended Locations for Architectural Hardware for Wood Flush Doors."

4. Where indicated to comply with accessibility requirements, in accordance with ICC A117.1 "Accessibility Guidelines for Buildings and Facilities."

5. Provide blocking in drywall partitions where wall stops or other wall mounted hardware is located.

G. Retrofitting:

1. Install door hardware to comply with manufacturer's published templates and written instructions.

2. Where cutting and fitting are required to install door hardware onto or into surfaces that are later to be painted or finished in another way, coordinate removal, storage, and reinstallation of surface protective trim units with finishing work specified in Section 09910 - Painting.

3. Do not install surface-mounted items until finishes have been completed on substrates involved.

H. Protection:

1. Protect door hardware from damage or marring of finish during construction, use strippable coatings, removable tapes, or other acceptable means.

2. Ensure door hardware displays no evidence of finish paint after final building cleanup.

I. Latch guard and dead bolts: Install so that bolts automatically engage in keeper, whether activated by closer or by manual pressure.

Page 1265 of 3040 ends

Door Hardware
08710-14 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/08710 (CONFORMED) J. Closers:

1. Mount on opposite sides of corridors or vestibules, except at exterior doors.

2. Mount for 180-degree swing wherever possible.

3. Mount with drop plates at narrow top rail doors.

4. Adjust to operate noiselessly and evenly.

5. Have closer manufacturer regulate closers prior to final acceptance of project.

K. Kick plates: Screw on push side of doors, unless otherwise indicated on the Drawings.

L. Gasketing: Mount to provide complete contact between door and frame, finished floor, or both; and weathertight enclosure.

M. Thresholds:

1. Install immediately before inspection for Substantial Completion or protect from heavy traffic damage during construction.

2. Cope to fit door frame profile and drill to suit required flush bolts and panic bolts.

3. Unless indicated on the Drawings to be set in grout, set in double bead of sealant, tightly fit at jambs, and make waterproof.

4. Set thresholds for exterior and acoustical doors in full bed of sealant complying with requirements specified in Section 07900 - Joint Sealants.

5. Fasten to concrete slab with 5/16-inch stainless steel flat head countersunk machine screws and concrete anchors at 8-inch centers.

N. Silencers:

1. Insert into predrilled holes in frames.

O. Storage:

1. Provide a secure lock up for hardware delivered to the project but not yet installed.

2. Control the handling and installation of hardware items so that the completion of the work will not be delayed by hardware losses before and after installation.

3.03 DOOR HARDWARE SETS
A. They are a guideline only and should not be considered a detailed hardware schedule.

B. Omitted items not included in a hardware set should be scheduled with the appropriate additional hardware required for proper application and functionality.

C. Quantities listed are for each pair of doors, or for each single door.

D. The Supplier is responsible for handing and sizing all products.

E. Where multiple options for a piece of hardware are given in a single line item, the Supplier shall provide the appropriate application for the opening.

F. Provide a list of Manufacturer’s Abbreviations.

Page 1266 of 3040 ends

Door Hardware
08710-15 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/08710 (CONFORMED)

3.04 CONSTRUCTION KEYING
A. Insert construction inserts in cylinder cores of exterior doors, and doors requiring security and access for workman, unless otherwise directed by the Engineer.

3.05 ADJUSTING
A. Examine hardware in place for complete and proper installation. Lubricate bearing surfaces for proper function.

B. Replace, rework, or otherwise correct defective door hardware, including incorrect hand or function.

3.06 CLEANING
A. Remove protective materials and devices and thoroughly clean exposed surfaces of hardware.

B. Check for surface damage prior to final cleaning for acceptance of project.

END OF SECTION

Page 1267 of 3040 ends
Page 1268 of 3040 ends

Painting
09910-1 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/09910 (CONFORMED) SECTION 09910

PAINTING
PART 1 GENERAL

1.01 SUMMARY
A. Section includes:

1. Field applied paints and coatings for normal exposures.

2. Painting Accessories.

1.02 DEFINITIONS
A. Paints: Manufacturer's best ready-mixed coatings, except when field catalyzed, with fully ground pigments having soft paste consistency and capable of being readily and uniformly dispersed to complete homogeneous mixture, having good flowing and brushing properties, and capable of drying or curing free of streaks or sags.

B. Volatile Organic Compound (VOC): Content of air polluting hydrocarbons in uncured coating product measured in units of grams per liter or pounds per gallon.

1.03 SUBMITTALS
A. General: Submit as specified in Section 01330 - Submittal Procedures.

B. Shop drawings: Include schedule of where and for what use coating materials are proposed in accordance with requirements for Product Data.

C. Product data: Include description of physical properties of coatings including solids content and ingredient analysis, VOC content, temperature resistance, typical exposures and limitations, and manufacturer's standard color chips.

D. Samples: Include 8-inch square draw-downs or brush-outs of topcoat finish when requested. Identify each sample as to finish, formula, color name and number and sheen name and gloss units.

E. Manufacturer's instructions: Submit in accordance with requirements for Product Data. Include:

1. Special requirements for transportation and storage.

2. Mixing instructions.

3. Shelf life.

4. Pot life of material.

5. Precautions for applications free of defects.

6. Surface preparation.

7. Method of application.

8. Recommended number of coats.

9. Recommended thickness of each coat.

10. Recommended total thickness.

Page 1269 of 3040 ends

Painting
09910-2 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/09910 (CONFORMED)

11. Drying time of each coat, including prime coat.

12. Required prime coat.

13. Compatible and non-compatible prime coats.

14. Recommended thinners, when recommended.

15. Limits of ambient conditions during and after application.

16. Time allowed between coats.

17. Required protection from sun, wind, and other conditions.

18. Touch-up requirements and limitations.

F. Submit notarized certificate that:

1. All paints and coatings to be used on this project comply with the State of California Air Resources Board Rule 1113 VOC Regulations effective as of January 1, 2004; and that

2. All paints and coatings to be used on this project comply with the VOC regulations of the State of California Air Management District in which the coatings will be used, effective January 1, 2004.

1.04 QUALITY ASSURANCE
A. Products: First line or best grade.

B. Materials for each paint system: By single manufacturer.

C. Applicator qualifications: Applicator of products similar to specified products with minimum 3 years of experience.

D. Regulatory requirements: Comply with by using paints that do not exceed governing agency's VOC limits or do not contain lead.

E. Field samples:

1. Paint 1 complete surface of each color scheme to show colors, finish texture, materials, and workmanship.

2. Obtain approval before painting other surfaces.

1.05 PRODUCT DELIVERY, STORAGE, AND HANDLING
A. Deliver, store, and handle products as specified in Section 01600 - Product Requirements.

B. Remove unspecified and unapproved paints from Project site immediately.

C. Deliver containers with labels identifying:

1. Manufacturer's name.

2. Brand name.

3. Product type.

4. Batch number.

5. Date of manufacturer.

6. Expiration date or shelf life.

7. Color.

8. Mixing and reducing instructions.

Page 1270 of 3040 ends

Painting
09910-3 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/09910 (CONFORMED) D. Store coatings in well-ventilated facility that provides protection from the sun weather, and fire hazards.

1. Maintain ambient storage temperature between 45 and 90 degrees Fahrenheit, unless otherwise recommended by the manufacturer.

E. Take precautions to prevent fire and spontaneous combustion.

1.06 ENVIRONMENTAL CONDITIONS
A. Surface moisture contents: Do not paint surfaces that exceed manufacturer specified moisture contents, or when not specified by the manufacturer, the following moisture contents:

1. Plaster and gypsum wallboard: 12 percent.

2. Masonry, concrete, and concrete block: 12 percent.

3. Interior located wood: 15 percent.

4. Concrete floors: 7 percent.

B. Do not paint or coat:

1. Under dusty conditions.

2. When light on surfaces measures less than 15 foot-candles.

3. When ambient or surface temperature is less than 50 degrees Fahrenheit or unless manufacturer allow a lower temperature.

4. When relative humidity is higher than 85 percent, unless manufacturer allows a higher relative humidity.

5. When surface temperature is less than 5 degrees Fahrenheit above dew point.

6. When surface temperature exceeds the manufacturer's recommendation.

7. When ambient temperature exceeds 90 degrees Fahrenheit, unless manufacturer allows a higher temperature.

8. Apply clear finishes at minimum 65 degrees Fahrenheit.

C. Provide fans, heating devices, or other means recommended by coating manufacturer to prevent formation of condensate or dew on surface of substrate, coating between coats and within curing time following application of last coat.

D. Provide adequate continuous ventilation and sufficient heating facilities to maintain minimum 50 degrees Fahrenheit for 24 hours before, during and 48 hours after application of finishes.

1.07 PROTECTION
A. Protect adjacent surfaces from paint and damage. Repair damage resulting from inadequate or unsuitable protection.

B. Furnish sufficient drop cloths, shields, and protective equipment to prevent spray or droppings from fouling surfaces not being painted and in particular, surfaces within storage and preparation area.

C. Place cotton waste, cloths, and material that may constitute fire hazard in closed metal containers and remove daily from site.

Page 1271 of 3040 ends

Painting
09910-4 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/09910 (CONFORMED) D. Remove electrical plates, surface hardware, fittings and fastenings, prior to painting operations.

1. Carefully store, clean and replace on completion of painting in each area.

2. Do not use solvent or degreasers to clean hardware that may remove permanent lacquer finish.

1.08 EXTRA MATERIALS
A. Extra materials: Deliver as specified in Section 01770 - Closeout Procedures.

Include minimum 1 gallon of each type and color of coating applied:

1. When manufacturer packages material in gallon cans, deliver unopened labeled cans as comes from factory.

2. When manufacturer does not package material in gallon cans, deliver material in new gallon containers, properly sealed and identified with typed labels indicating brand, type, and color.

PART 2 PRODUCTS

2.01 MANUFACTURERS
A. Paints: One of the following or equal:

1. Carboline: Carboline.

2. PPG Paints/PMC.

3. S/W: Sherwin-Williams Co.

4. Tnemec: Tnemec Co.

B. Submit requests for substitutions as specified in Section 01600 - Product Requirements:

1. Include certified ingredient analyses.

2. Provide colors that match specified colors.

2.02 PRETREATMENT, PRIMERS, PRIMER-SEALERS, AND WOOD STAIN A. Aluminum primer:

1. Manufacturers: One of following or equal:
a. Carboline Co.: Carbocrylic 120.
b. PPG: Pitt-Tech® Plus 4020 PF Interior/Exterior Primer/Finish, 4020PF. c. Sherwin-Williams Co.: DTM Wash Primer.

B. Concrete masonry filler/primer:

1. Manufacturers: One of following or equal:
a. Carboline Co.: Sanitile 100.
b. PPG: Perma-Crete® Interior/Exterior Block and Masonry Surfacer/Filler, 4-100XI.
c. Sherwin-Williams Co.: HD Block Filler, B42W46.
d. Tnemec:
1) Series 130, Envirofill.
2) Series 180, Tneme-crete.

Page 1272 of 3040 ends

Painting
09910-5 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/09910 (CONFORMED) C. Concrete, porous, filler/primer:

1. Manufacturers: One of following or equal:
a. Carboline Co.: Sanitile 100.
b. PPG: Perma-Crete® Interior/Exterior Block and Masonry Surfacer/Filler, 4-100XI.
c. Sherwin-Williams Co.: HD Block Filler, B42W46.
d. Tnemec:
1) Series 130, Envirofill.
2) Series 180, Tneme-crete.

D. Concrete, smooth, filler/primer:

1. Manufacturers: One of following or equal:
a. Carboline Co.: Sanitile 100.
b. Carboline Co.: Carbocrylic 120.
c. PPG:
1) Perma-Crete® Interior/Exterior Block and Masonry Surfacer/Filler, 4-100XI.
2) Seal Grip® Hydrosealer Exterior Bonding Primer/Sealer, 17-6001. d. Sherwin-Williams Co.:
1) HD Block Filler, B42W46.
2) Epoxy Masonry Tilt Primer White B42WW49.
e. Tnemec: Series 180, Tneme-Crete.

E. Ferrous metal primer:

1. Manufacturers: One of following or equal:
a. Carboline Co.: Carboguard 890.
b. PPG: PITT-GUARD® Rapid-Coat Direct-to-Rust Epoxy Mastic Coating, 95-245 Series.
c. Sherwin-Williams Co.: Macropoxy 646.
d. Tnemec: Series 104.

F. Galvanized metal surface pretreatment materials:

1. Manufacturers: One of following or equal:
a. Carboline Co.: Surface Cleaner 3.
b. PPG: Duraprep® Concentrated Degreaser, Prep125.

G. Galvanized metal surface primer:

1. Manufacturers: One of following or equal:
a. Carboline Co.: Carboguard 890.
b. PPG: PITT-GUARD® Rapid-Coat Direct-to-Rust Epoxy Mastic Coating, 95-245 Series Sherwin-Williams Co.: Macropoxy 646.
c. Tnemec: Series 104.

H. Plaster sealer:

1. Manufacturers: One of following or equal:
a. Carboline Co.: Sanitile 120.
b. PPG: Seal Grip® Gripper® Universal Interior/Exterior Primer/Sealer, 17-921XI.
c. Sherwin-Williams Co.:
1) Promar 200 Primer B28W8200.
2) Loxon Masonry Primer A24W300.

Page 1273 of 3040 ends

Painting
09910-6 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/09910 (CONFORMED) I. Plywood, latex finishes:

1. Manufacturers: One of following or equal:
a. Carboline Co.: Sanitile 120.
b. PPG:
1) Exterior: Seal Grip® Hydrosealer Exterior Bonding Primer/Sealer, 17-6001.
2) Interior: PPG Seal Grip Gripper Interior/Exterior 100 percent Acrylic Latex Primer, 17-921XI Series.
c. Sherwin-Williams Co.: A100 Latex Primer B42W8041.

J. Wood primer for opaque finish paint, interior exposure:

1. Manufacturers: One of following or equal:
a. Carboline Co.: Sanitile 120.
b. PPG: PPG Seal Grip Gripper Interior/Exterior 100 percent Acrylic Latex Primer, 17-921XI Series.
c. Sherwin-Williams Co.: PrepRite Latex Primer B28W111.

K. Wood primer for opaque finish paint, exterior exposure:

1. Manufacturers: One of following or equal:
a. Carboline Co.: Sanitile 120.
b. Sherwin-Williams Co.: A-100 Primer B42W.
c. PPG: Seal Grip® Hydrosealer Exterior Bonding Primer/Sealer, 17-6001.

L. Wood stain:

1. Manufacturers: One of following or equal:
a. Sherwin-Williams Co.:
1) Interior: Wood Classic.
2) Exterior: Woodscapes.
b. PPG:
1) Interior: DEFT.
2) Exterior: PROLUXE.

2.03 PAINTS, INTERIOR EXPOSURE
A. Latex, flat:

1. Manufacturers: One of following or equal:
a. Carboline Co.: Carbocrylic 3359 MC flat.
b. PPG:
1) Speedhide® Zero Interior Flat, 6-5110 Series.
2) Ultralast Interior Matte, 13-210 Series.
c. Sherwin-Williams Co.: Promar 200, B30W200.

B. Latex, semi-gloss:

1. Manufacturers: One of following or equal:
a. Carboline Co.: Carbocrylic 3359 MC.
b. PPG:
1) Speedhide® Zero Interior Semi-Gloss, 6-5510 Series.
2) Copper Armor Interior Latex Paint + Primer Semi-Gloss, 29-1510. c. Sherwin-Williams Co.: Promar 200, B77W3402D.

Page 1274 of 3040 ends

Painting
09910-7 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/09910 (CONFORMED) C. Acrylic, semi-gloss:

1. Manufacturers: One of following or equal:
a. Carboline Co.: Carbocrylic 3359 MC.
b. PPG:
1) Speedhide® Zero Interior Semi-Gloss, 6-5510 Series.
2) Copper Armor Interior Latex Paint + Primer Semi-Gloss, 29-1510. c. Sherwin-Williams Co.: Promar 200, B77W3402D.
d. Tnemec: Series 1029, Enduratone.

2.04 PAINTS, EXTERIOR EXPOSURE
A. Latex, flat:

1. Manufacturers: One of following or equal:
a. Carboline Co.: Carbocrylic 3359 MC flat.
b. PPG:
1) Speedhide® Exterior Flat, 6-6510XI.
c. Sherwin-Williams Co.: A-100, Flat Exterior Latex A6-100. d. Tnemec: 1028 Enduratone.

B. Acrylic latex, semi-gloss:

1. Manufacturers: One of following or equal:
a. Carboline Co.: Carbocrylic 3359 MC flat.
b. PPG:
1) Speedhide® Exterior Semi-Gloss, 6-901XI.Sherwin-Williams Co.:

A-100, Flat Exterior Latex A6-100.
c. Tnemec: 1028 Enduratone.

PART 3 EXECUTION

3.01 INSPECTION
A. Thoroughly examine surfaces scheduled to be painted before starting work.

B. Start painting when unsatisfactory conditions have been corrected.

3.02 SURFACE PREPARATION
A. Prepare surfaces in accordance with paint manufacturer's instructions or when none, the following:

1. Aluminum:
a. Remove surface contamination by steam, high-pressure water, or degreasers.
b. Abrade surface by abrasive blasting, power tool cleaning or hand tool cleaning.
c. Apply etching primer.

2. Reinforced concrete panels:
a. Remove dirt, powdery residue, and foreign matter.
b. Paint immediately; both sides when applicable.

3. Canvas and cotton insulation coverings: Remove dirt, grease, and oil.

Page 1275 of 3040 ends

Painting
09910-8 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/09910 (CONFORMED)

4. Concrete floors:
a. Remove contamination, abrasive blast or acid etch and rinse with clear water.
b. Ensure required acid-alkali balance is achieved. Allow to dry thoroughly.

5. Copper for paint finish:
a. Remove contamination by steam, high-pressure water, or degreasers. b. Abrade surface by abrasive blasting, power tool cleaning or hand tool cleaning.
c. Apply vinyl etch primer.

6. Copper for oxidized finish:
a. Remove contamination.
b. Apply oxidizing solution of copper acetate and ammonium chloride in acetic acid.
c. Rub on repeatedly for correct effect.
d. Once attained rinse surfaces well with clear water and allow to dry.

7. Gypsum wallboard:
a. Remove contamination and prime to show defects.
b. Repair and prime defects.

8. Galvanized surfaces:
a. Remove surface contamination and oils and wash with degreasers. b. Apply coat of etching type primer.

9. Zinc coated surfaces: Remove surface contamination and oils and prepare for priming in accordance with metal manufacturer's recommendations.

10. Concrete and concrete masonry:
a. Remove dirt, loose mortar, scale, powder, and other foreign matter. b. Remove oil and grease with solution of tri-sodium phosphate. c. Remove stains caused by weathering of corroding metals with solution of sodium metasilicate.
d. Rinse well and allow to thoroughly dry.
e. Spot prime exposed metal with alkyd primer.

11. Plaster:
a. Fill hairline cracks, small holes and imperfections with patching plaster. b. Smooth off to match adjacent surfaces.
c. Wash and neutralize high alkali surfaces where they occur.

12. Unprimed steel and iron: Remove grease, rust, scale, dirt, and dust by wire brushing, sandblasting or other necessary method.

13. Shop primed steel:
a. Sand and scrape to remove loose primer and rust.
b. Feather out edges to make touch-up patches inconspicuous. c. Clean surfaces.
d. Prime bare steel surfaces.

14. Wood and millwork:
a. Sandpaper to smooth even surface.
b. Wipe off dust and grit prior to priming.
c. Spot coat knots, pitch streaks, and sappy sections with sealer. d. Fill nail holes and cracks after primer has dried and sand between coats.

15. Exterior wood siding:
a. Remove dust, grit, and foreign matter.
b. Seal knots, pitch streak, and sappy sections.
c. Fill nail holes with exterior caulking compound after prime coat has been applied.

Page 1276 of 3040 ends

Painting
09910-9 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/09910 (CONFORMED)

16. Mildew:
a. Remove by scrubbing with solution of tri-sodium phosphate and chlorine bleach.
b. Rinse with clean water and allow surface to dry completely.

17. Glue laminated woods:
a. Remove grease and dirt.
b. Wash down surfaces with degreasers.

3.03 APPLICATION
A. Apply each coat at proper consistency.

B. Tint each coat of paint slightly darker than preceding coat.

C. Sand lightly between coats to achieve required finish.

D. Do not apply finishes on surfaces that are not sufficiently dry.

E. Allow each coat of finish to dry before following coat is applied, unless directed otherwise by manufacturer.

F. Where clear finishes are required ensure tint fillers match wood.

1. Work fillers well into grain before set.

2. Wipe excess from surface.

G. Backprime exterior woodwork, which is to receive paint finish, with exterior primer paint.

H. Backprime interior woodwork, which is to receive paint or enamel finish, with enamel undercoat paint.

I. Backprime interior and exterior woodwork, which is to receive stain or varnish finish, with gloss varnish reduced 25 percent with mineral spirits.

J. Prime top and bottom edges of wood and metal doors with enamel undercoat when they are to be painted.

K. Prime top and bottom edges of wood doors with gloss varnish when they are to receive stain or clear finish.

3.04 MECHANICAL AND ELECTRICAL EQUIPMENT
A. Identify equipment, ducting, piping, and conduit in accordance with Related Sections.

B. Remove grilles, covers, and access panels for mechanical and electrical system from location and paint separately.

C. Finish paint primed equipment with color selected by the Engineer.

Page 1277 of 3040 ends

Painting
09910-10 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/09910 (CONFORMED) D. Prime and paint insulated and bare pipes, conduits, boxes, insulated and bare ducts, hangers, brackets, collars, and supports, except where items are plated or covered with prefinished coating.

E. Replace identification markings on mechanical or electrical equipment when painted over or spattered.

F. Paint interior surfaces of air ducts, convector, and baseboard heating cabinets that are visible through grilles and louvers with 1 coat of flat black paint, to limit of sight line.

G. Paint dampers exposed immediately behind louvers, grilles, convector, and baseboard cabinets to match face panels.

H. Paint exposed conduit and electrical equipment occurring in finished areas with color and texture to match adjacent surfaces.

I. Paint both sides and edges of plywood backboards for electrical equipment before installing backboards and mounting equipment on them.

J. Color code equipment, piping, conduit, exposed ductwork, and apply color banding and identification, such as flow arrows, naming and numbering, in accordance with the Contract Documents.

3.05 SURFACES NOT REQUIRING FINISHING
A. Stainless steel, brass, bronze, copper, Monel®, chromium, anodized aluminum:

Specially finished articles such as porcelain enamel, plastic coated fabrics, and baked enamel.

B. Finished products such as ceramic tile, windows, glass, brick, resilient flooring, acoustical tiles, board and metal tees; other architectural features, such as finish hardware, furnished in aluminum, bronze or plated ferrous metal, prefinished panels, or other items that are installed prefinished.

C. Items completely finished at factory, such as preformed metal roof and wall panels, aluminum frames, toilet compartments, sound control panels, acoustical tiles, shower compartments, folding partition, and flagpole.

3.06 CLEANING
A. As work proceeds and upon completion, promptly remove paint where spilled, splashed, or spattered.

B. During progress of work, keep premises free from unnecessary accumulation of tools, equipment, surplus materials, and debris.

C. Upon completion of work, leave premises neat and clean.

Page 1278 of 3040 ends

Painting
09910-11 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/09910 (CONFORMED)

3.07 INTERIOR PAINT SCHEDULE
A. Aluminum: 2 coats of following finish paints over specified primer:

1. Acrylic, semi-gloss:
a. Surfaces not scheduled otherwise.

B. Concrete masonry: 2 coats of following finish paints over block filler:

1. Latex, semi-gloss:
a. Walls.

C. Concrete, smooth: 2 coats of following finish paints over specified sealer:

1. Latex, flat:
a. Surfaces not scheduled otherwise.

D. Metal, non-galvanized ferrous: 2 coats of following finish paints over specified primer:

1. Acrylic, semi-gloss:
a. Surfaces not scheduled otherwise.

3.08 EXTERIOR PAINT SCHEDULE
A. Aluminum: 2 coats of following finish paints over specified primer:

1. Acrylic, semi-gloss:
a. Surfaces not scheduled otherwise.

B. Concrete masonry: 2 coats of following finish paints over specified block filler:

1. Latex, flat:
a. Surface not scheduled otherwise.

C. Concrete, smooth: 2 coats of following finish paints over specified primer:

1. Latex, flat:
a. Surface not scheduled otherwise.

D. Metal, ferrous: Following finish coat over specified primer:

1. Acrylic, semi-gloss:
a. Surface not scheduled otherwise.

E. Metal, galvanized: 2 coats of following finish paints over pretreatment and specified primer:

1. Acrylic, semi-gloss:
a. Surface not scheduled otherwise.

END OF SECTION

Page 1279 of 3040 ends
Page 1280 of 3040 ends

High-Performance Coatings
09960-1 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/09960 (CONFORMED) SECTION 09960

HIGH-PERFORMANCE COATINGS

TABLE OF CONTENTS
PART 1 GENERAL.................................................................................................................2

1.01 SUMMARY ...................................................................................................................2

1.02 REFERENCES.............................................................................................................2

1.03 DEFINITIONS...............................................................................................................3

1.04 ABBREVIATIONS.........................................................................................................5

1.05 SUBMITTALS...............................................................................................................6

1.06 QUALITY ASSURANCE...............................................................................................8

1.07 PRODUCT DELIVERY, STORAGE, AND HANDLING ..............................................10

1.08 PROJECT CONDITIONS ...........................................................................................11

1.09 MAINTENANCE .........................................................................................................13

1.10 CTR RESPONSIBILITIES ..........................................................................................13 PART 2 PRODUCTS ............................................................................................................15

2.01 DESIGN AND PERFORMANCE CRITERIA ..............................................................15

2.02 MATERIALS ...............................................................................................................15

2.03 COATING SYSTEMS IDENTIFICATION ...................................................................15

2.04 PRODUCTS FOR COATING SYSTEMS ...................................................................16 PART 3 EXECUTION ...........................................................................................................16

3.01 GENERAL PROTECTION REQUIREMENTS............................................................16

3.02 GENERAL SURFACE PREPARATION REQUIREMENTS .......................................17

3.03 MECHANICAL AND ELECTRICAL EQUIPMENT PREPARATION ...........................18

3.04 CLEANING OF NEW AND PREVIOUSLY COATED OR NEW SURFACES.............18

3.05 BLAST CLEANING.....................................................................................................19

3.06 PREPARATION REQUIREMENTS FOR CONCRETE SURFACES .........................20

3.07 GENERAL PREPARATION REQUIREMENTS FOR METALLIC SURFACES..........21

3.08 PREPARATION REQUIREMENTS BY SURFACE TYPE .........................................22

3.09 APPLICATION REQUIREMENTS..............................................................................23

3.10 APPLICATION REQUIREMENTS FOR CONCRETE COATING SYSTEMS ............27

3.11 COATING SYSTEM SCHEDULE...............................................................................28

3.12 SURFACES NOT REQUIRING COATING.................................................................28

3.13 QUALITY CONTROL..................................................................................................29

3.14 CORRECTIVE MEASURES.......................................................................................30

3.15 CLEANUP...................................................................................................................30

3.16 FINAL INSPECTION ..................................................................................................30

ATTACHMENT A - SCHEDULE OF SURFACES TO BE COATED

ATTACHMENT B - COATING DETAIL SHEETS

Page 1281 of 3040 ends

High-Performance Coatings
09960-2 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/09960 (CONFORMED) PART 1 GENERAL

1.01 SUMMARY
A. Section includes: Coatings, including coating systems, surface preparation, application requirements, and quality control requirements.

1.02 REFERENCES
A. ASTM International (ASTM):

1. D16 - Standard Terminology for Paint, Related Coatings, Materials, and Applications.

2. D2200 - Standard Practice for Use of Pictorial Surface Preparation Standards and Guides for Painting Steel Surfaces.

3. D3359 - Standard Test Methods for Rating Adhesion by Tape Test.

4. D3960 - Standard Practice for Determining Volatile Organic Compound (VOC) Content of Paints and Related Coatings.

5. D4262 - Standard Test Method for pH of Chemically Cleaned or Etched Concrete Surfaces.

6. D4263 - Standard Test Method for Indicating Moisture in Concrete by the Plastic Sheet Method.

7. D4285 - Standard Test Method for Indicating Oil or Water in Compressed Air.

8. D4414 - Standard Practice for Measurement of Wet Film Thickness by Notch Gages.

9. D4417 - Standard Test Methods for Field Measurement of Surface Profile of Blast-Cleaned Steel.

10. D4541 - Standard Test Methods for Pull-Off Strength of Coatings Using Portable Adhesion Testers.

11. D4787 - Standard Practice for Continuity Verification of Liquid or Sheet Linings Applied to Concrete Substrates.

12. D5162 - Standard Practice for Discontinuity (Holiday) Testing of Nonconductive Protective Coating on Metallic Substrates.

13. D7234 - Standard Test Method for Pull-Off Adhesion Strength of Coatings on Concrete Using Portable Pull-Off Adhesion Testers.

14. E337 - Standard Test Method for Measuring Humidity with a Psychrometer (the Measurement of Wet- and Dry-Bulb Temperatures).

15. F1869 - Standard Test Method for Measuring Moisture Vapor Emission Rate of Concrete Subfloor Using Anhydrous Calcium Chloride.

16. F2170 - Standard Test Method for Determining Relative Humidity in Concrete Floor Slabs Using In-situ Probes.

B. International Concrete Repair Institute (ICRI):

1. 310.2 - Guideline for Selecting and Specifying Concrete Surface Preparation for Sealers, Coatings, Polymer Overlays, and Concrete Repair.

C. NACE International (NACE):

1. SP0178 - Design, Fabrication, and Surface Finish Practices for Tanks and Vessels to Be Lined for Immersion Service.

2. SP0188 - Discontinuity (Holiday) Testing of New Protective Coatings on Conductive Substrates.

Page 1282 of 3040 ends

High-Performance Coatings
09960-3 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/09960 (CONFORMED) D. National Association of Pipe Fabricators (NAPF):

1. 500-03 - Surface Preparation Standard for Ductile Iron Pipe and Fittings in Exposed Locations Receiving Special External Coatings and/or Special Internal Linings.

E. NSF International (NSF):

1. 61 - Drinking Water System Components - Health Effects.

F. Occupational Safety and Health Administration (OSHA).

G. Society of Protective Coatings (SSPC):

1. Glossary - SSPC Protective Coatings Glossary.

2. Guide 6 - Guide for Containing Surface Preparation Debris Generated during Paint Removal Operations.

3. Guide 15 - Field Methods for Retrieval and Analysis of Soluble Salts on Steel and Other Nonporous Substrates.

4. PA 1 - Shop, Field, and Maintenance Painting of Steel.

5. PA 2 - Procedure for Determining Conformance to Dry Coating Thickness Requirements.

6. PA 9 - Measurement of Dry Coating Thickness Using Ultrasonic Gages.

7. QP 1 - Standard Procedure for Evaluating the Qualifications of Industrial/Marine Painting Contractors.

8. SP 1 - Solvent Cleaning.

9. SP 3 - Power Tool Cleaning.

10. SP 5 - White Metal Blast Cleaning.

11. SP 10 - Near-White Metal Blast Cleaning.

12. SP 11 – Power Tools Cleaning to Bare Metal.

13. SP 13 - Surface Preparation of Concrete.

14. SP 16 - Brush-Off Blast Cleaning of Coated and Uncoated Galvanized Steel, Stainless Steels, and Non-Ferrous Metals.

15. SP COM - Surface Preparation Commentary.

16. SP VIS 1 - Guide and Reference Photographs for Steel Surfaces Prepared by Dry Abrasive Blast Cleaning.

17. SP WJ-1 - Waterjet Cleaning of Metals - Clean to Bare Substrate.

18. SP WJ-2 - Waterjet Cleaning of Metals - Very Thorough Cleaning.

19. SP WJ-3 - Waterjet Cleaning of Metals - Thorough Cleaning.

20. SP WJ-4 - Waterjet Cleaning of Metals - Light Cleaning.

1.03 DEFINITIONS
A. Definitions used in this Section are in accordance with definitions referenced in ASTM D16, ASTM D3960, and SSPC Glossary of Definitions.

B. Specific definitions:

1. Abrasive: Material used for blast cleaning, such as sand, grit, or shot.

2. Abrasive Blast Cleaning: Cleaning/surface preparation by abrasive propelled at high speed.

3. Anchor Pattern: Profile or texture of prepared surface(s).

4. Biogenic Sulfide Corrosion: Corrosion caused by sulfuric acid formed when Thiobacillus bacteria metabolizes hydrogen sulfide.

Page 1283 of 3040 ends

High-Performance Coatings
09960-4 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/09960 (CONFORMED)

5. Bug Holes: Small cavities resulting when air bubbles are entrapped in the surface of formed concrete during placement and consolidation.

6. System: Protective film with 1 or more coats applied in a predetermined order, including surface preparation and quality control requirements.

7. Coating/Paint/Lining Thickness: Total thickness of primer, intermediate, and/or finish coats after drying or curing.

8. Dew point: Temperature a given air/water vapor mixture starts to condense.

9. Drying Time: Time interval between application and material curing.

10. Dry to Recoat: Time interval between material application and its ability to receive the next coat.

11. Dry to Touch: Time interval between material application and its ability to tolerate a light ouch without coating damage.

12. Exposed Surface: Any indoor or outdoor surface not buried or encased.

13. Feather Edging: Reducing coating thickness at its edge to blend with existing surrounding coating.

14. Feathering: Tapering off a wet edge with a comparatively dry brush.

15. Ferrous: Cast iron, ductile iron, wrought iron, and all steel alloys except stainless steel.

16. Field Coat: Application of a surface coating system at the work site.

17. Finish Coat: Final coat in a paint system, including texture, color, smoothness of surface, and other properties affecting appearance.

18. Hold Point: A defined point, specified in this Section, at which work shall be halted for inspection.

19. Holiday: A discontinuity, skip, void, or pinhole in coating or coating system film that exposes the substrate.

20. Honeycomb: Segregated and porous surface of hardened concrete due to insufficient consolidation.

21. Hydroblast: High or ultra-high-pressure water jet surface preparation.

22. Incompatibility: One coating's inability to overlay another coating or surface as evidenced by bleeding, poor bonding, or lifting of old coating; inability of a coating to bond to a substrate.

23. Immersed/Immersion: A service condition in which substrate is submerged, is immediately above liquids, or is subject to frequent wetting, splashing, or washdown.

24. Laitance: A thin, weak, brittle layer of cement and aggregate fines on a concrete surface.

25. Mil: 0.001 inch.

26. Overspray: Dry spray, particularly paint bonded to an unintended surface.

27. Pinhole: A small diameter discontinuity in a coating or coating system film, created by offgassing from a void in a concrete or masonry substrate causing a void between coats or exposing the substrate. Usually caused by coating application while temperature is rising.

28. Pot Life: Time interval after components are mixed and coating can be satisfactorily applied.

29. Prime Coat: First full paint coat applied to a surface when using a multicoat system. Primers adhere to a new substrate, protect the substrate, and promote adhesion of subsequent coats of paint. The prime coat on metal surfaces is the first full coat and does not include solvent wash, grease emulsifiers, or other pretreatment applications.

Page 1284 of 3040 ends

High-Performance Coatings
09960-5 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/09960 (CONFORMED)

30. Resurfacer/Resurfacing Material: A layer of cementitious and/or resin-based material used to fill or otherwise restore surface continuity to worn or damaged concrete surfaces.

31. Shelf Life: Maximum storage time a material may be stored without losing its usefulness.

32. Shop Coat: 1 or more coats applied in an off-site shop or plant before shipment to work site where field or finishing coat(s) are applied.

33. Spreading Rate: Area covered by a unit volume of paint at a specific thickness.

34. Stripe Coat: A separate brush coat of paint applied to all weld seams, pits, nuts/bolts/washers, and edges. This coat shall not be applied until previous coats have cured. Once applied, the coat shall be allowed to cure before subsequent coats are applied.

35. Tie Coat: An intermediate coat that bonds different types of paint material, improving succeeding coat adhesion.

36. Thick Film Coating System: A coating system applied with a minimum dry film thickness of 25 mils.

37. Touch-Up Painting: Application of paint on previously painted surfaces to repair marks, scratches, and deteriorated or damaged areas to restore the appearance and performance of the coating.

38. Water Blast: An alternative to air abrasive blast cleaning that can be used with or without abrasive injection. Water cleaning at pressures up to 5,000 pounds per square inch is called low-pressure water cleaning or power washing.

High-pressure water cleaning uses water pressures between 5,000 and 10,000 pounds per square inch. Water jetting is water blasting with added abrasive at pressures between 10,000 and 25,000 pounds per square inch.

Ultra-high-pressure water jetting is water blasting at pressures above 25,000 pounds per square inch.

39. Weld Splatter: Beads of non-structural weld metal that adhere to the surrounding surface, removed as part of surface preparation.

1.04 ABBREVIATIONS
A. CSM - Coating System Manufacturer.

B. CMU - Concrete Masonry Units.

C. CSA - Coating System Applicator. Specialty subcontractor retained by the Contractor to install the coating systems specified in this Section.

D. CTR - Coating System Manufacturer's Technical Representative.

E. DFT - Dry-Film Thickness. Thickness of cured film, usually expressed in mils (0.001 inch).

F. SSD - Surface Saturated Dry. Refers to concrete surface condition where the surface is saturated (damp) without the presence of standing water.

G. TPC - Technical Practice Committee.

Page 1285 of 3040 ends

High-Performance Coatings
09960-6 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/09960 (CONFORMED) H. VOC - Volatile Organic Compound. Portion of the coating that is a compound of carbon, is photochemically reactive, and evaporates during drying or curing; expressed in grams per liter (g/l) or pounds per gallon (lb/gal). VOC is determined by EPA Method 24.

I. WFT - Wet Film Thickness. Coating thickness as measured immediately after application. Usually expressed in mils (0.001 inch).

1.05 SUBMITTALS
A. As specified in Section 01330 - Submittal Procedures, submit the following:

1. Schedule of proposed coating materials.

2. Schedule of surfaces to be coated with each coating material.

3. Dehumidification and heating plan.

4. Product data:
a. Physical properties of coatings, including the following:
1) Solids content.
2) Ingredient analysis.
3) VOC content.
4) Temperature resistance.
5) Typical exposures and limitations.
6) Manufacturer's standard color chips.
b. Compliance with regulatory requirements:
1) VOC limitations.
2) Lead compounds and polychlorinated biphenyls.
3) Abrasives and abrasive blast cleaning techniques and disposal. 4) Methods for tenting blasting areas and methods to protect existing equipment from dust and debris.
5) NSF certification of coatings for potable water supply systems. c. CSM's current printed recommendations and product data sheets for coating systems, including:
1) Surface preparation recommendations.
2) Primer type.
3) Maximum dry and wet-mil thickness per coat and number of coats. a) Coating Coverage Worksheets.
4) Minimum and maximum curing time between coats, including atmospheric conditions for each.
5) Curing time before submergence in liquid.
6) Thinner to be used for each coating.
7) Ventilation requirements.
8) Minimum and maximum atmospheric conditions during which the paint shall be applied.
9) Allowable application methods.
10) Maximum allowable substrate moisture content.
11) Maximum shelf life.
12) Requirements for transportation and storage.
13) Mixing instructions.
14) Shelf life.
15) Material Pot life.
16) Precautions for applications free of defects.
17) Method of application.

Page 1286 of 3040 ends

High-Performance Coatings
09960-7 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/09960 (CONFORMED) 18) Drying time of each coat, including prime coat.
19) Compatible prime coats.
20) Limits of ambient conditions during and after application. 21) Required protection from sun, wind, and other conditions. 22) Touch-up requirements and limitations.
23) Minimum adhesion of each system submitted in accordance with ASTM D4541 and ASTM D7234.
d. Samples: Include 8-inch square drawdowns or brushouts of topcoat finish when requested. Identify each sample as to finish, formula, color name and number, sheen name, and gloss units.
e. Affidavits signed by an officer of the CSM’s corporation attesting to full compliance of each coating system component with current federal, state, and local air pollution control regulations and requirements. f. List of cleaning and thinner solutions allowed by the CSMs. g. Storage requirements, including temperature, humidity, and ventilation for Coating System Materials as recommended by the CSMs.
h. Thick film coating systems (greater than 25 mils):
1) CSM's detailed written instructions for coating system treatment and graphic details for coating system terminations in coated structures, including pipe penetrations, metal embedments, gate frames, and other terminations encountered.
2) Include detail treatment for coating system at concrete joints. 3) Manufacturer's Representative’s (CTR) Field Reports.

5. Quality assurance submittals:
a. Quality assurance plan.
b. Qualifications of CSA, including:
1) List of Similar Projects.
a) Name and address of project.
b) Year of installation.
c) Year placed in operation.
d) Point of contact: Name and phone number.
2) Provide a minimum of 5 project references, each including contact name, address, and telephone number where similar coating work has been performed by their company in the past 5 years. c. CSA Reports:
1) Written daily quality control inspection reports.
d. CTR Reports:
1) Reports on visits to project site to view and approve surface preparation of structures to be coated.
2) Reports on visits to project site to observe and approve coating application procedures.
3) Reports on visits to coating plants to observe and approve surface preparation and coating application on shop-coated items.

Page 1287 of 3040 ends

High-Performance Coatings
09960-8 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/09960 (CONFORMED)

1.06 QUALITY ASSURANCE
A. CSA qualifications:

1. Minimum of 5 years of experience applying specified type or types of coatings under conditions similar to those of the Work:
a. Provide qualifications of applicator and references listing 5 similar projects completed in the past 5 years.

2. SSPC-QP 1 certified.

3. Manufacturer-approved applicator when manufacturer has approved applicator program or when required in these specifications.

B. CTR qualifications:

1. Certification, one of the following:
a. NACE Level 2 or 3 Certified Coating Inspector.
b. SSPC Level 3 Protective Coatings Inspector.

2. Minimum of 5 years of experience evaluating application of manufacturer's coatings under conditions similar to those of the Work:
a. Provide CTR qualifications and references listing 5 similar projects completed in the past 5 years.

C. Regulatory requirements: Comply with governing agencies' regulations by using coatings conforming to their VOC limits.

1. Lead-based coatings are not permitted.

2. Do not use coal-tar epoxy in contact with drinking water or exposed to ultraviolet radiation.

D. Pre-installation conference: Conduct as specified in Section 01312 - Project Meetings.

1. Coordinate Hold Point schedule.

E. Field samples:

1. Prepare and coat a minimum 100-square-foot area of each system between corners or limits such as control or construction joints.

2. Approved field sample may be part of the Work.

F. Obtain approval before coating other surfaces. Use products by same manufacturer for prime coats, intermediate coats, and finish coats on same surface, unless specified otherwise.

G. CSM services:

1. CSA shall arrange for CTR to attend pre-installation conferences.

2. Visit the project site periodically to consult on and inspect specified surface preparation and application Hold Points.

3. Visit coating plants to observe and approve surface preparation procedures and coating application of items to be shop primed and coated.

4. CTR shall provide written inspection reports.

Page 1288 of 3040 ends

High-Performance Coatings
09960-9 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/09960 (CONFORMED) H. Quality control requirements:

1. Contractor shall be responsible for the workmanship and quality of the coating system installation.
a. Inspections by Owner, Engineer, CSA, or CTR will not relieve or limit Contractor’s responsibilities.

2. Conform to this specification's requirements and the standards referenced in this Section. Changes in the coating system application requirements will be allowed only with the Engineer's written acceptance.

3. Specially trained crews with experience applying the specified coating system coating are required for:
a. Coating application using plural component spray equipment or other specialty equipment.
b. Coating with specialty linings for severe service conditions, including floor coatings, and with linings for corrosive headspaces or secondary containment areas.

4. CTR shall specially train personnel for coating systems as specified in Attachment B - Coating Detail Sheets.
a. CSM shall approve personnel in writing applying the coating system.

5. Do not use contaminated, outdated, diluted materials, and/or materials from previously opened containers.

6. Identify inspection access points used by Owner's or Engineer's personnel.

7. Provide ventilation, ingress, egress, or other means as necessary for Owner's or Engineer’s personnel to safely access the work areas.

8. Conduct and continually inspect work so the coating system is installed as specified. The CSM shall provide written directions to correct coating work not conforming to the specifications or is otherwise unacceptable.

9. Provide written daily reports summarizing test data, work progress, surfaces covered, ambient conditions, quality control inspection test findings, and other information pertinent to the coating system application. a. Determine relative humidity in accordance with ASTM E337. Confirm other conditions, such as proper protective measures for surfaces not to be coated and safety requirements for personnel.
1) Measure daily at shift's beginning and end and at intervals not to exceed 4 hours during the shift.
2) Determine the acceptability of weather and/or environmental conditions within the structure in accordance with the CSM's requirements.
b. Monitoring surface preparation: Spot check cleanliness, surface profile, and surface pH testing at least 3 times daily. Check each surface at least once. In accordance with:
1) ASTM D4262.
2) ASTM D4263.
3) ASTM D4417.
4) ICRI 310.2 requirements.
5) SSPC Surface Preparation Standards.
c. Confirm that compressed air used for surface preparation or blow-down cleaning is free of oil and moisture.
d. Monitor surface preparation daily at shift's beginning and end and at intervals not to exceed 4 hours during the shift.
e. Do not apply coatings when environmental conditions are outside of the CSM's published limits.

Page 1289 of 3040 ends

High-Performance Coatings
09960-10 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/09960 (CONFORMED) f. Monitoring coatings application: Continuously inspect, measure, and record the wet film thickness and general film quality (visual inspection) for runs, sags, pinholes, holidays, etc. during coating. 1) Perform WFT measurements in accordance with ASTM D4414. g. Post cure evaluation: Measure and inspect the overall dry film thickness on all surfaces. Conduct a DFT survey and perform adhesion testing, holiday detection, or cure testing as required in this Section and/or the CSM’s written instructions. Perform all applicable tests in accordance with ASTM D4541, ASTM D4787, ASTM D5162, ASTM D7234, SSPC-PA 1, SSPC-PA 2, SSPC-PA 9, and other pertinent standards and recommended practices.

I. Inspection at Hold Points:

1. Conduct inspections at Hold Points during the coating system application and record the results.

2. Coordinate Hold Points with the Engineer so the Engineer can observe Contractor’s inspections on a scheduled basis.

3. Provide the Engineer a minimum of 24 hours of notice before conducting Hold Point Inspections.

4. Hold Points shall be as follows:
a. Conditions before surface preparation: Before starting surface preparation, observe, record, and confirm that oil, grease, and/or soluble salts are gone from the surface.
b. Post surface preparation: After completing surface preparation, measure and inspect for cleanliness and proper surface profile as specified in this Section and in the CSM’s written instructions.
c. Coatings application: At the beginning of any coating system application, measure, record, and confirm acceptability of surface and ambient air temperature and humidity. Inspect applicator's equipment for serviceability and suitability for coatings application.
d. Post application inspection: Identify defects in application work on all surfaces, including pinholes, holidays, excessive runs or sags, inadequate or excessive film thickness, and other problems.
e. Follow-up corrective actions and final inspection: Measure and re-inspect corrective coating work performed to repair defects at prior Hold Points, and repeat until the surface condition is acceptable. Conduct final visual inspection with follow-up tests, such as holiday detection, adhesion tests, and DFT surveys.
f. Coatings application: At the beginning of coating system application, measure, record, and confirm acceptability of surface and ambient air temperature and humidity. Inspect applicator's equipment for serviceability and suitability for coatings application.
1) Observe conditions during the Pre-application Meeting.

1.07 PRODUCT DELIVERY, STORAGE, AND HANDLING
A. Deliver, store, and handle products as specified in Section 01600 - Product Requirements.

B. Immediately remove unspecified and unapproved coatings from Project site.

Page 1290 of 3040 ends

High-Performance Coatings
09960-11 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/09960 (CONFORMED) C. Deliver new labeled, unopened containers:

1. Do not deliver materials after manufacturer's expiration date or over 12 months from manufacturing date, whichever is more stringent. Store materials in well-ventilated enclosed structures and protect from weather and excessive heat or cold in accordance with the CSM’s recommendations. a. Store flammable materials in accordance with federal, state, and local requirements.
b. Store rags and cleanup materials appropriately to prevent fire and spontaneous combustion.

2. Store and dispose of hazardous waste in accordance with federal, state, and local requirements. This requirement specifically applies to waste solvents and coatings.

3. Container labels shall show the following:
a. Brand name or product title.
b. CSM's batch number.
c. CSM's manufacture date.
d. CSM's name.
e. Generic material type.
f. Application and mixing instructions.
g. Hazardous material identification label.
h. Shelf life expiration date.
i. Color.
j. Mixing and reducing instructions.

4. Clearly mark containers to indicate safety hazards associated with the use of or exposure to materials.

1.08 PROJECT CONDITIONS
A. Apply coatings to dry surfaces.

1. Surface moisture: Comply with manufacturer's requirements or as specified in this Section.
a. Plaster and gypsum wallboard: 12 percent.
b. Masonry and concrete block: 12 percent.
c. Interior located wood: 15 percent.
d. Concrete floors: Moisture vapor transmission rate of no more than

3.0 pounds per 1,000 square feet per 24 hours in accordance with ASTM F1869 or relative humidity no greater than 80 percent if tested in accordance with ASTM F2170 unless the CSM's recommendations are more restrictive.
e. Concrete structures: Negative results from Plastic Sheet Test in accordance with ASTM D4263, and maximum of 80 percent relative humidity in accordance with ASTM F2170.

B. Do not apply coatings when the following conditions exist. If such conditions exist, provide containment, covers, environmental controls, and other necessary measures.

1. During rainy, misty, or damp weather, or to surfaces with frost or condensation.

2. When the surface temperature is below 10 degrees Fahrenheit above the dew point.

Page 1291 of 3040 ends

High-Performance Coatings
09960-12 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/09960 (CONFORMED)

3. When ambient or surface temperature:
a. Is less than 55 degrees Fahrenheit unless manufacturer allows a lower temperature.
b. Is less than 65 degrees Fahrenheit for clear finishes, unless manufacturer allows a lower temperature.
c. Exceeds 90 degrees Fahrenheit, unless manufacturer allows a higher temperature.
d. Exceeds manufacturer's recommendation.

4. When relative humidity is higher than 85 percent.

5. Under dusty or adverse environmental conditions.

6. When light on surfaces measures less than 15 foot-candles.

7. When wind speed exceeds 15 miles per hour.

C. Apply coating only under evaporation conditions rather than condensation.

1. Use dehumidification equipment, fans, and/or heaters inside enclosed areas to maintain required atmospheric and surface temperature requirements for proper coating application and cure.

2. Measure and record relative humidity and air and surface temperatures at the start and end of each shift to confirm proper humidity and temperature levels inside the work area.
a. Submit test results.

D. Continuously ventilate, dehumidify, and heat enclosed spaces with high humidity during surface preparation, coating application, and curing.

1. Maintain minimum air temperature of 55 degrees Fahrenheit and 10 degrees Fahrenheit above the dew point.

2. Maintain dew point of at least 10 degrees Fahrenheit less than the temperature of the coldest part of the structure where work is performed.

3. Reduce dew point temperature in conditioned space by at least 10 degrees Fahrenheit within 20 minutes.

4. Seal work areas and maintain positive pressure per dehumidification equipment supplier's recommendations.

5. Maintain these conditions before, during, and after application to ensure proper adhesion and cure of coatings for no less than:
a. Entire curing period.
b. 8 hours after coating.

E. Systems:

1. Site electrical power availability as specified in Section 01500 - Temporary Facilities and Controls.

2. Internal combustion engine generators may be used.
a. Obtain required permits and provide air pollution and noise control devices on equipment as required by permitting agencies require. b. Comply with state, federal, and local fire and explosion protection measures when locating and operating generator.
c. Locate engine generator outside hazardous classified areas per NFPA 820.
d. Provide daily fuel service for generator for duration of use.

Page 1292 of 3040 ends

High-Performance Coatings
09960-13 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/09960 (CONFORMED)

3. Dehumidification:
a. Provide desiccant or refrigeration drying.
b. Use only desiccant types with a rotary desiccant wheel capable of continuous operation.
c. Liquid, granular, or loose lithium chloride drying systems are not acceptable.

4. Heating:
a. Use electric, indirect combustion, or steam coil.
b. Direct-fired combustion heaters are not acceptable heat sources during abrasive blasting, coating application, or coating cure.

5. Filters:
a. Use a filtration system for dust removal designed to not interfere with dehumidification equipment’s ability to control dew point and relative humidity inside the reservoir.
b. Do not allow air from the working area or dust filtration equipment to recirculate through thein dehumidifier during coating application or when solvent vapors are present.

6. Design and submittals:
a. Prepare and submit dehumidification and heating plan, including all equipment and operating procedures.
b. Suppliers of services and equipment shall have at least 3 years of experience in similar applications.

F. Provide containment and ventilation system components in accordance with SSPC-Guide 6, Level 3 and as required for hazardous materials.

1.09 MAINTENANCE
A. Provide table of products applied organized by surface type. List coating manufacturer, color, color formulation, distributor name, telephone number, and address.

B. Provide extra materials:

1. Minimum 1 gallon of each type and color of coating applied or provide additional quantities if specified in the Contract Documents:
a. Deliver unopened factory-labeled cans when manufacturer packages material in gallon cans.
b. Deliver material in new gallon containers, properly sealed and identified with permanently affixed, durable, printed labels indicating brand, type, and color, when manufacturer does not package material in gallon cans, deliver.

1.10 CTR RESPONSIBILITIES
A. General:

1. Attend pre-installation conference.

2. Perform onsite application training.

3. Periodically inspect coating system application.

Page 1293 of 3040 ends

High-Performance Coatings
09960-14 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/09960 (CONFORMED) B. Coating system installation training:

1. Provide a minimum of 8 hours of classroom and off-site training for application personnel and supervisory personnel in one of the following ways:
a. Train a minimum of 2 supervisory personnel and 2 application personnel. b. Submit a letter from the CSM stating that CSM approves the supervisory and application personnel, listed by name and responsibility, and no additional training is required.

2. CTR can train up to 14 application personnel and 3 supervisory personnel at a time.

3. Minimum training requirements:
a. Explain in detail the mixing, application, curing, and termination requirements.
b. Provide hands-on demonstration of coating system mixing. c. Explain in detail the ambient condition requirements for temperature and humidity.
d. Explain in detail the surface preparation requirements. e. Explain in detail the re-coat times, cure times, and related ambient condition requirements.
f. Write a letter stating that training was satisfactorily completed by the personnel, listed by name and responsibility.

4. Provide special training as specified in the Coating Detail Sheets.

C. Coating system inspection:

1. CTR inspection is in addition to the CSA's inspection as specified in this Section.

2. Be on-site to oversee:
a. Coating application at least once a week.
b. End of surface preparation.
c. During coating application.
d. Post-cure inspection.

3. Routinely inspect and verify in writing that application personnel have successfully performed surface preparation, filler/surfacer application, coating system application, and Quality Control Inspection in accordance with this Section and to warrantable quality.

4. Perform the following activities to confirm conformance with the specifications:
a. Inspect ambient conditions during coating system installation at Hold Points for conformance with the specified requirements. b. Inspect each coated surface type and coating system applied to verify the following:
1) Cleanliness.
2) Surface pH for concrete substrates.
3) Confirm surface preparation of substrates where coating system will terminate or will be applied for conformance to the specified application criteria.
c. Verify surface profile of substrates by completing the following:
1) Inspect preparation and application of coating detail treatment at terminations, transitions, metal embedments in concrete, and joints and cracks in substrates.
2) Inspect application of filler/surfacer materials for concrete and masonry substrates.
3) Verify proper mixing of coating materials.

Page 1294 of 3040 ends

High-Performance Coatings
09960-15 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/09960 (CONFORMED) 4) Inspect application of primers and finish coats, including wet and dry film thickness.
5) Inspect coating systems for proper cure times and conditions. d. Review adhesion testing of cured coating systems.
e. Review coating system continuity testing.
f. Inspect and record representative-localized repairs. g. Conduct final review of completed coating system installation. h. Prepare and submit site visit reports after each site visit to document that the coating work is in accordance with the CSM’s Recommendations.

D. Final report:

1. Prepare a final report, after coating work ends, summarizing each day's test data, observations, drawings, and photographs. Include substrate conditions, ambient conditions, and application procedures observed during the CTR's site visits. Include a statement that completed work was performed in accordance with the requirements of the CSM’s recommendations.

PART 2 PRODUCTS

2.01 DESIGN AND PERFORMANCE CRITERIA
A. Coating materials shall be formulated for environments encountered in water and wastewater treatment processes.

B. Coating materials that come in contact with water distributed as potable water shall be certified in accordance with NSF 61.

2.02 MATERIALS
A. General:

1. Product requirements as specified in Section 01600 - Product Requirements.

2.03 COATING SYSTEMS IDENTIFICATION
A. Naming Conventions: Coating Systems Identifications contain the elements defined in Table 1.

Table 1 Coating System Identification Elements
First Element - Second Element - Third Element - Fourth Element (optional)
3 or 4 alpha
characters
1-3 alpha
characters
1 number 3 or 4 alpha characters
Coating Type Substrate System Number Additional Substrate or Special Condition
Example: EPX - C - 6 - BSC
1) First element identifies the coating type using the following abbreviations:
a) ACR: Acrylic.
b) CTE: Coal tar epoxy.
c) ELA: Elastomeric acrylic.
d) EPU: Epoxy-polyurethane.

Page 1295 of 3040 ends

High-Performance Coatings
09960-16 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/09960 (CONFORMED) e) EPX: Epoxy.
f) POL: Polyurethane.
g) SIL: Silicone.
h) SILX: Siloxane or silane.
i) VE: Vinyl ester.
2) Second element identifies the substrate using the following abbreviations:
a) C: Concrete or masonry.
b) F: Concrete flooring.
c) FRP: Fiber-reinforced plastic.
d) GM: Galvanized metal.
e) M: Metal.
f) PVC: Polyvinyl chloride, chlorinated polyvinyl chloride. 3) Third element identifies the sequential system number. a) For example, EPX-C-2 is the second standard epoxy coating system for concrete substrates.
4) Fourth element is optional and identifies the additional substrate or special condition with the following abbreviations:
a) PWS: Potable water service applications (NSF-61 approved). b) BSC: Biogenic sulfide corrosion-resistant applications in wastewater. c) BG: Below grade or buried.
d) OZ: Organic zinc primer, epoxy polyurethane system.
e) SC: Secondary containment.

2.04 PRODUCTS FOR COATING SYSTEMS
A. Products: As specified in Attachment B - Coating Detail Sheets.

B. Cleaning solvents:

1. Requirements for solvent wash, solvent wipe, or cleaner used, including, but not limited to, those used for surface preparation in accordance with SSPC-SP 1:
a. Emulsifying type.
b. Containing no phosphates.
c. Biodegradable.
d. Does not damage zinc.
e. Compatible with the specified primer.
f. Complying with applicable air-quality control board requirements.

2. Use clean white cloths and clean fluids in solvent cleaning.

PART 3 EXECUTION

3.01 GENERAL PROTECTION REQUIREMENTS
A. Protect adjacent coated surfaces from coatings and damage associated with coating work. Repair damage resulting from inadequate or unsuitable protection.

B. Use drop cloths and other coverings to protect adjacent surfaces not to be coated against spatter and droppings.

C. Mask off surfaces of items not to be coated or remove items from area.

Page 1296 of 3040 ends

High-Performance Coatings
09960-17 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/09960 (CONFORMED) D. Furnish and deploy sufficient drop cloths, shields, and protective equipment to prevent spray or droppings from fouling surfaces not being coated and, in particular, surfaces within storage and preparation areas.

E. Place coating waste, cloths, and material that may pose a fire hazard in closed metal containers and remove daily from site.

F. Remove electrical plates, surface hardware, fittings, and fasteners before coating application. Carefully store, clean, and replace items after completing coating in each area. Do not use solvent or degreasers to clean hardware that may remove permanent lacquer finishes.

G. Erect and maintain protective enclosures in accordance with SSPC-Guide 6.

H. Protect the following surfaces from abrasive blasting by masking or by other means:

1. Threaded portions of valve and gate stems, grease fittings, and identification plates.

2. Machined surfaces for sliding contact.

3. Surfaces to be assembled against gaskets.

4. Surfaces of shafting where sprockets will be fit.

5. Surfaces of shafting where bearings will be fit.

6. Machined bronze surfaces, including slide gates.

7. Cadmium-plated items, except cadmium-plated, zinc-plated, or sherardized fasteners used to assemble equipment requiring abrasive blasting.

8. Galvanized items, unless scheduled to be coated.

I. Protect installed equipment, mechanical drives, and adjacent coated equipment from abrasive blasting to prevent damage caused by spent abrasive blast media, dust, or dirt entering such equipment.

J. Schedule cleaning and coating to keep dust and spray from the cleaning process from falling on wet, newly coated surfaces.

1. Whenever possible, coordinate with other trades and complete surface preparation and coating work before installing hardware, hardware accessories, nameplates, data tags, electrical fixtures, and similar uncoated items that will be in contact with coated surfaces. Mask machined surfaces, sprinkler heads, and other small items that will not be coated.

2. After completing coating, reinstall removed items.

3. Disconnect and move equipment adjacent to walls to clean and coat equipment and walls. Replace and reconnect equipment after coating.

3.02 GENERAL SURFACE PREPARATION REQUIREMENTS
A. Prepare surfaces in accordance with CSM's instructions unless more stringent requirements are specified in this Section.

B. Coating detail sheets in Attachment B - Coating Detail Sheets include additional surface preparation requirements.

C. Follow more stringent requirement if information conflicts.

Page 1297 of 3040 ends

High-Performance Coatings
09960-18 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/09960 (CONFORMED) D. Where required by the Owner’s representative, a NACE International certified coatings inspector, provided by the Owner, will inspect and approve surfaces to be coated before applying a coating.

1. CSA shall coordinate coating inspections.
a. Identify coating inspection Hold Points during the pre-installation conference.
b. Provide at least 2 days' notice before inspection.

2. Contractor shall correct surface defects identified by the inspector at no additional cost to Owner.

3.03 MECHANICAL AND ELECTRICAL EQUIPMENT PREPARATION
A. Identify equipment, ducting, piping, and conduit as specified in Section 15050 - Common Work Results for Mechanical Equipment, Section 15076 - Pipe Identification, and Section 16075 - Identification for Electrical Systems.

B. Remove grilles, covers, and access panels for mechanical and electrical system and coat separately.

C. Prepare and finish coat equipment primed by the manufacturer using specified intermediate and top coats, as applicable, and color selected by the Owner.

D. Prepare, prime, and coat both insulated and bare pipes, conduits, boxes, insulated and bare ducts, hangers, brackets, collars, and supports, except where items are covered with material not requiring coating, or with a prefinished coating.

E. Replace identification markings on mechanical or electrical equipment when coated over or spattered.

F. Prepare and coat interior surfaces of air ducts and convector and baseboard heating cabinets visible through grilles and louvers with 1 coat of flat black paint to limit of sight line.

G. Prepare and coat dampers exposed immediately behind louvers, grilles, and convector and baseboard heating cabinets to match face panels.

H. Prepare and coat exposed conduit and appurtenances occurring in finished areas with color and texture to match adjacent surfaces.

I. Prepare and coat sides' front, back, and edges of plywood backboards for electrical equipment before installing backboards and mounting equipment on them.

J. Color code equipment, piping, conduit, and exposed ductwork and apply color banding and identification, such as flow arrows, naming, and numbering, in accordance with the Contract Documents.

3.04 CLEANING OF NEW AND PREVIOUSLY COATED OR NEW SURFACES A. Utilize cleaning agent to remove soluble salts, such as chlorides, from concrete and metal surfaces:

1. Cleaning agent: Biodegradable non-flammable and containing no VOC.

Page 1298 of 3040 ends

High-Performance Coatings
09960-19 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/09960 (CONFORMED)

2. Manufacturers: The following or equal:
a. CHLOR*RID International, Inc.
1) Complete soluble salt removal with steam or warm water cleaning.

3. Steam clean and degrease surfaces to be coated to remove oils and grease.

4. Clean surfaces with decontamination agent in conjunction with abrasive blast cleaning, steam cleaning, high-pressure washing, or hand washing, as approved by the CTR and the Engineer.

5. Test cleaned surfaces to ensure removal of soluble salts. Carry out additional cleaning as needed.

6. Complete final surface preparation before applying new coating system in strict accordance with CSM's printed instructions.

3.05 BLAST CLEANING
A. Surface preparation requirements:

1. Do not reuse spent blast abrasive.

2. Ensure that filter compressed air used for blast cleaning is free of condensed water and oil. Clean moisture traps at least once every 4 hours or more frequently, as required, to prevent moisture from entering the abrasive blasting equipment air supply. Check blast air for moisture and oil after each cleaning in accordance with ASTM D4285.

3. Install oil separators just downstream of compressor discharge valves and at the discharge point of blast pot discharges. Check separators on the same frequency as the moisture traps.

4. Keep regulators, gauges, filters, and separators on compressor air lines to blasting nozzles operational at all times.

5. Install an air dryer or desiccant filter drying unit to dry the compressed air before blast pot connections. Use and maintain the dryer throughout surface preparation work.

6. Use a venturi-type, or other high velocity-type, abrasive blast nozzles supplied with at least 100 pounds per square inch gauge air pressure at the nozzle and enough volume to obtain appropriate blast cleaning production rates and surface cleanliness.

7. Provide airborne particulate evacuation and filtering that meets OSHA safety standards. Maintain optimal visibility both to clean and provide the specified surface profile and to allow inspection of the substrate during surface preparation work.

8. If prepared and cleaned metallic substrates become contaminated between final surface preparation work and coating system application, or if the prepared substrate darkens or changes color, re-clean by water blasting, or abrasive blast cleaning as appropriate until the specified degree of cleanliness is restored.

B. Water jetting or water blasting:

1. Use water jetting or water blasting for recoating or relining where an adequate surface profile exists.

2. Perform water jetting or water blasting in accordance with SSPC-SP 13 and SSPC-WJ-1, WJ-2, WJ-3, WJ-4.

Page 1299 of 3040 ends

High-Performance Coatings
09960-20 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/09960 (CONFORMED)

3.06 PREPARATION REQUIREMENTS FOR CONCRETE SURFACES
A. Cure for at least 28 days before coating.

B. Remove degraded concrete using abrasive blast cleaning or high or ultra-high-pressure water jetting, chipping, or other abrading tools until achieving a sound, clean substrate. Remove all bruised or cracked concrete.

C. Prepare substrate cracks and areas requiring resurfacing; perform detail treatment, including, but not limited to, terminating edges per the CSM's recommendations and as indicated on the Drawings.

1. Prepare concrete surfaces in accordance with SSPC-SP 13.

D. Prepare concrete surfaces in accordance with SSPC-SP 13.

1. Inspect concrete surfaces to select appropriate surface preparation method to provide a suitable substrate for the specified coating system.

2. Use blast cleaning or other means to expose the complete perimeter of air voids or bug holes. Do not leave shelled over, hidden air voids beneath the exposed concrete surface.

3. Repair concrete defects and physical damage.

4. Clean concrete surfaces of dust, mortar, formwork, fins, loose concrete particles, form release materials, oil, and grease.

5. Fill voids to provide surface as specified in Section 03366 - Tooled Concrete Finishing.

E. Provide clean substrate visually free of calcium sulfate, loose, coarse, or fine aggregate, laitance, loose hydrated cement paste, and otherwise harmful substances.

1. Confirm concrete surface minimum pH of 9.0 with surface pH testing.

2. If after surface preparation the surface pH remains below 9.0, perform additional water blasting, cleaning, or abrasive blast cleaning until additional pH testing indicates an acceptable pH level.

F. Prepare concrete surface for coating in accordance with SSPC-SP 13.

1. Provide ICRI 310.2 minimum No. 3 concrete surface profile (CSP) or as specified on Coating Detail Sheets.

2. Evaluate profile of the prepared concrete using ICRI 310.2 surface profile replicas.

G. Blast clean cementitious repair mortars or grouts to the same profile and degree of cleanliness requirements required for concrete substrates.

H. Blast clean polymer-based surfacers or waterborne modified cementitious surfaces only if they have exceeded the CSM's recommended recoat time.

I. Vacuum all concrete surfaces before coating application, leaving a dust free, sound concrete substrate.

1. Thoroughly clean concrete surfaces to be coated to remove loose dirt and spent abrasive.

2. Remove debris produced by blast cleaning from the structures to be coated, and legally dispose of it off-site.

Page 1300 of 3040 ends

High-Performance Coatings
09960-21 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/09960 (CONFORMED) J. Test moisture content of concrete to be coated:

1. Conduct ASTM D4263 plastic sheet test at least once for every 500 square feet of surface area to be coated.
a. Any moisture on plastic sheet after test period constitutes a non-acceptable test, and the concrete must be dried further.

2. Conduct ASTM F1869 test at least once for every 1,000 square feet of concrete floor surface area to be coated.

3. Conduct ASTM F2170 one relative humidity moisture test at least once for each 500 square feet of non-floor concrete surface area where the opposite side is exposed to soil or water.
a. Waterproof surfaces exposed to soil or water where specified in Section 07110 - Dampproofing.

4. Comply with specified minimum moisture content and CSM’s written recommendations for moisture vapor transmission rates or relative humidity values.

K. Masonry surfaces:

1. Cure for at least 28 days before coating.

2. Prepare masonry surfaces to remove chalk, laitance, loose dirt, dried mortar splatter, dust, peeling, or loose existing coatings, or otherwise deleterious substances to leave a clean, sound substrate.

3. Wash and scrub masonry surfaces with clear water. Do not use muriatic acid.

4. Seal or fill masonry surfaces with a sealer or block filler compatible with the specified primer after cleaning.

5. Confirm that masonry surfaces are dry before coating application. a. If using pressure washing or low-pressure water blast cleaning for preparation, allow the masonry to dry for at least 5 days under dry weather conditions or until the minimum ambient temperature is 70 degrees Fahrenheit before coating.

3.07 GENERAL PREPARATION REQUIREMENTS FOR METALLIC SURFACES A. Remove rust, scale, and welding slag and spatter.

1. Remove and grind smooth all excessive weld material and weld spatter on metal surfaces before blast cleaning in accordance with NACE SP0178, Appendix C, Level C.

2. Grind sharp edges on metal substrate to approximately 1/16-inch radius before abrasive blast cleaning.

B. Prepare metallic surfaces in accordance with applicable portions of surface preparation specifications of the SSPC specified for each coating system.

1. Remove grease and oil in accordance with SSPC-SP 1.

2. Use solvent as recommended by the CSM.

3. Measure profile depth of the surface to be coated in accordance with Method C of ASTM D4417. Contractor shall select blast particle size and gradation to produce the specified surface profile.

4. Constantly monitor and maintain ambient environmental conditions to ensure cleanliness and that no “rust back” occurs before coating material application.

Page 1301 of 3040 ends

High-Performance Coatings
09960-22 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/09960 (CONFORMED) C. Prepare metallic surfaces by blast cleaning in accordance with SSPC-VIS 1 (ASTM D2200). Prepare abrasive blast representative areas for the Owner's representative to inspect on the first day of cleaning.

D. Unless otherwise specified, the requirements for blast cleaning steel, ductile iron, and stainless steel substrates are as follows:

1. Ferrous metal surfaces not to be submerged: Abrasive blast in accordance with SSPC-SP 10 unless blasting may damage adjacent surfaces, is prohibited, or is specified otherwise. Where abrasive blasting is not possible, clean surfaces to bare metal with power tools in accordance with SSPC-SP 11.

2. Ferrous metal surfaces to be submerged: Abrasive blast in accordance with SSPC-SP 5, unless specified otherwise, to clean and provide roughened surface profile with a depth between 2 and 4 mils.

3. Remove traces of grit, dust, dirt, rust scale, friable material, loose corrosion products, or embedded abrasive from substrate before coating application.

4. When abrasive blasted surfaces rust or discolor before coating, abrasive blast clean surfaces again.

E. Field preparation of shop-primed surfaces:

1. Smooth welds and prominences with power tools before applying field-applied coatings.

2. Clean and dry shop-primed ferrous metal surfaces and fabricated assemblies before applying field coats.

3. Prepare shop epoxy primed surfaces with light abrasive blasting or abrading and then vacuum before applying finish coats.
a. Follow CSM instructions for surface preparation when the primer recoat limit has been exceeded.

4. Non-immersion service: Clean in accordance with SSPC-SP 2 (Hand Tool Cleaning) or SSPC-SP 3 (Power Tool Cleaning) and uniformly roughen.

5. Immersion, BSC, and SC service: Remove shop primer in accordance with SSPC-SP 5 (Near-White Blast Cleaning).

F. Damaged shop primer or rust bleeding:

1. Ferrous metals: Clean in accordance with SSPC-SP 1 (Solvent Cleaning) and spot blast in accordance with SSPC-SP 10 (Near-White Metal Blast Cleaning) to achieve a uniform surface profile between 2.0 and 2.5 mils before recoating.

2. Reject galvanized steel with rust bleeding.

G. Damaged coating: Repair by abrasive blast cleaning surfaces as specified for the coating system; feather to a smooth transition before touching up.

3.08 PREPARATION REQUIREMENTS BY SURFACE TYPE
A. Galvanized steel and non-ferrous metal surfaces:

1. Degrease or solvent clean (SSPC-SP 1) to remove oily residue.

2. Abrasive blast clean in accordance with SSPC-SP 16.
a. If abrasive blast cannot be performed, abrade in accordance with SSPC-SP 3 (Power Tool Cleaning).

Page 1302 of 3040 ends

High-Performance Coatings
09960-23 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/09960 (CONFORMED)

3. Apply metal pretreatment within 24 hours before coating galvanized surfaces that cannot be thoroughly abraded, such as bolts, nuts, or preformed channels.

4. Test surface for contaminants using copper sulfate solution.

B. Stainless-steel surfaces:

1. Abrasive blast clean in accordance with SSPC-SP 16 to leave a clean, uniform appearance with surface profile between 1.5 and 2.5 mils.

C. Ductile iron pipe and fittings to be lined or coated: Abrasive blast clean in accordance with NAPF 500-03.

D. Sherardized, aluminum, copper, and bronze surfaces:

1. Abrasive blast clean in accordance with SSPC-SP 16.

2. Prepare in accordance with CSM's instructions.

E. Cadmium-plated, zinc-plated, or sherardized fasteners:

1. Abrasive blast in the same manner as uncoated metal when assembling equipment designated for abrasive blasting.

F. PVC and FRP surfaces:

1. Lightly sand surfaces to be coated.
a. Sand to remove gloss and establish uniform surface profile.

2. Vacuum to remove loose dust, dirt, and other materials.

3. Solvent clean with clean white rags and allow solvent to evaporate completely before applying coating materials.

3.09 APPLICATION REQUIREMENTS
A. Apply coatings in accordance with manufacturer's instructions.

B. Empty aboveground piping to be coated of contents when applying coatings.

C. Mechanical equipment shop primed by the manufacturer.

1. Pumps and valves: Shop coat with manufacturer's highest quality coating system meeting the project specifications.
a. Contractor shall provide CTR shop coating reports.

2. Non-immersed equipment: Touch up shop primer, and coat in the field with specified coating system after installation.
a. If project requires equipment removal and reinstallation, complete touch-up coating after final installation.

3. Immersed equipment not shop coated: Remove shop primer before surface preparation and field apply coating.

D. Verify surface preparation immediately before applying coating in accordance with SSPC-SP COM and the SSPC visual standard for the specified surface preparation method.

E. Allow surfaces to dry, except where coating manufacturer requires surface wetting before coating.

Page 1303 of 3040 ends

High-Performance Coatings
09960-24 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/09960 (CONFORMED) F. Wash coat and prime sherardized, aluminum, copper, and bronze surfaces, or prime with manufacturer's recommended special primer.

G. Do not apply coatings to a surface until it has been prepared as specified.

H. Use equipment designed to apply materials specified.

1. Use compressors with moisture traps and filters that remove water and oils from the air.
a. Perform a paper blotter test at the Engineer's request to verify air is sufficiently free of oil and moisture. Do not allow the amount of oil and moisture to exceed CSM-recommended amount.

2. Equip spray equipment with properly sized mechanical agitators, pressure gauges, pressure regulators, and spray nozzles.

I. Where 2 or more coats are required, tint prime coat intermediate coats as necessary to distinguish each coating and to help indicate coverage.

1. Do not use color additives with chromium, lead or lead compounds that hydrogen sulfide, other corrosive gases, might destroy or alter. Apply the specified number of coats.

J. Apply coating by brush, roller, trowel, or spray unless a specific application method is required by coating manufacturer's instructions or these Specifications.

1. Apply primer or first coat by brush to power tool cleaned ferrous surfaces.

2. Brush or spray-apply coats for blast-cleaned ferrous surfaces and subsequent coats for non-blast cleaned ferrous surfaces.

3. After prime coat dries, mark, repair, and retest pinholes and holidays before intermediate or top coats are applied.

K. Spray application:

1. With a brush, stripe coat edges, welds, corners, nuts, bolts, and difficult-to-reach areas, as necessary, before spray application to ensure specified coating thickness along edges.

2. When using spray application, apply each coat to thickness no greater than recommended in coating manufacturer's instructions.

3. Use airless spray method unless air spray method is required by CSM's instruction or these Specifications.

4. Conduct spray coating under controlled conditions. Protect adjacent construction and property from coating mist, fumes, or overspray.

L. Lightly sand and thoroughly clean surfaces to receive high-gloss finishes unless CSM instructs otherwise.

M. Remove all dust on coatings between coats.

N. Shop and field coats:

1. Prime coat: Shop-apply or field-apply prime coats as specified. Use shop-applied primer compatible with the specified field coating system and apply at the minimum dry film thickness recommended by the finish coat CSM. a. Provide data sheets identifying the shop primer to on-site coating application personnel.
b. Perform adhesion tests on the shop primer.

Page 1304 of 3040 ends

High-Performance Coatings
09960-25 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/09960 (CONFORMED) c. Remove and recoat damaged, deteriorated, and poorly applied shop coatings.
d. If shop primer coat meets this Section's requirements, spot prime exposed metal of shop-primed surfaces before spray applying primer over the entire surface.

2. Field coats: Apply field coats with 1 or more prime coats and finish coats to build up coating to dry film thickness specified for the coating system. a. Do not apply finish coats until other work in the area is complete and previous coats are inspected.

3. Adhesion confirmation: Perform adhesion tests after proper coating cure in accordance with ASTM D3359. Demonstrate that:
a. Prime coat adheres to the substrate.
b. Coatings adhere to the prime and intermediate coats. 1) Coating 5 mils or more DFT: Achieve adhesion test result of 5A on immersed surfaces and 4A or better on other surfaces.
2) Coating less than 5 mils DFT: Achieve adhesion test results of 5B on immersed surfaces and 4B or better on other surfaces.

O. Brush, roll, trowel, or spray and back roll coats for concrete and masonry.

P. Plural component coating application:

1. Premix contents of component drums if required by the CSM each day.

2. Before starting application:
a. Verify gauges are working properly.
b. Complete ratio checks.
c. Sample the mix on plastic sheeting to ensure set time is appropriate and complete.
d. Label and retain all spray samples. Submit to Engineer when requested.

Q. Drying and recoating:

1. Provide fans, heating devices, or other means to prevent condensate or dew on substrate surface or between coats and during curing after applying the last coat.

2. Allow each coat to cure or dry thoroughly, in accordance with if required in CSM’s printed instructions, before recoating.

3. Use CSM's printed instructions and the requirements specified in this Section to determine minimum required drying time.
a. Do not allow excessive drying time or exposure, which may impair bond between coats.
b. Recoat all coatings within time limits recommended by CSM. c. If time limits are exceeded, abrasive blast clean and de-gloss clean before applying another coat.

4. If limitations on time between abrasive blasting and coating are not met before attaching components to surfaces that cannot be abrasive blasted, coat components before attachment.

5. Ensure primer and intermediate coats of coating are unscarred and completely integral when applying each succeeding coat.

6. Touch up suction spots between coats and apply additional coats where required to produce finished surface of solid, even color, free of defects.

Page 1305 of 3040 ends

High-Performance Coatings
09960-26 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/09960 (CONFORMED)

7. Leave no holidays. Repair all holidays in accordance with the requirements on pertinent Coating Detail Sheets or as recommended by the CSM.

8. Sand and feather into a smooth transition and recoat scratched, contaminated, or otherwise damaged coating surfaces so repairs are invisible to the naked eye.

R. Workmanship:

1. Ensure that coated surfaces are free from runs, drips, ridges, waves, laps, and brush marks. Coats shall be applied to produce a smooth, even film of uniform thickness completely coating corners and crevices.

2. Coat surfaces without drops, overspray, dry spray, excessive runs, ridges, waves, holidays, laps, or brush marks.

3. Remove splatter and droppings after coating work is completed.

4. Evenly apply each coat of material and sharply cut to a line created with masking tape or other suitable materials.

5. Avoid over spraying or spattering paint on surfaces not to be coated. Protect glass, hardware, floors, roofs, vehicles, and other adjacent areas and installations by taping, drop cloths, or other suitable measures.

6. When coating complex steel shapes, stripe coat welds, edges of structural steel shapes, metal cut-outs, pits in steel surfaces, or rough surfaces with the primer before overall coating system application.
a. Brush apply stripe coat to ensure proper coverage.
b. Do not stripe coat with spray or roller.

7. Ensure that finish coat, including repairs, has a uniform color and gloss.

S. Coating properties, mixing, and thinning:

1. Thin prime coat and apply as recommended by the CSM. Thinned coating must comply with prevailing air pollution control regulations.

2. If maximum recoat time is exceeded, prepare surface with solvent washing, light abrasive blasting, or other procedures per CSM’s instructions.

3. Allow adequate drying time between coats as instructed by the CSM, adjusted as necessary for the site conditions.

4. Ensure that coatings, when applied, provide a satisfactory film and a smooth even surface. Lightly sand glossy undercoats to provide a surface suitable for proper application and adhesion of subsequent coats. Thoroughly stir and strain coating materials during application and maintain uniform consistency.

5. Mix coatings with 2 or more components in accordance with CSM’s instructions.

6. Where necessary to suit conditions of the surface, temperature, weather, and method of application, thin the coating per CSM's recommendations. a. Ensure that volatile organic content (VOC) of the thinned coating complies with prevailing air pollution control regulations.
b. Thin coatings to only what is necessary to obtain proper application characteristics.
c. Use a thinner recommended by the CSM.

T. Film thickness and continuity:

1. Apply coating to the specified thicknesses.
a. Apply additional coats when necessary to achieve specified thicknesses, especially at edges and corners.

Page 1306 of 3040 ends

High-Performance Coatings
09960-27 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/09960 (CONFORMED)

2. Verify WFT of the coating system first coat and after applying each subsequent coat.

3. Do not allow the minimum thickness at any point to deviate more than 25 percent from the required average.

4. Do not allow the surface area covered per gallon of coating for various types of surfaces to exceed those recommended by the CSM.
a. Provide coating coverage worksheets listing the maximum and minimum coverage for each unit volume of coating for concrete surfaces.

5. Apply additional coats to achieve the specified dry film thickness if brush or roller application methods cannot achieve the specified film thicknesses per coat.

U. Protecting coated surfaces:

1. Do not handle, work on, or otherwise disturb coated items until the coating is completely dry and hard.

2. After installation, recoat shop-coated surfaces with specified coating system as necessary to match surrounding surfaces, and to coordinate with the specified color identification requirements.

V. Special requirements:

1. Before erection, apply all but the final finish coat to interior surfaces of roof plates, roof rafters and supports, pipe hangers, piping in contact with hangers, and contact surfaces inaccessible after assembly. Apply final coat after erection.

2. Coat structural slip-critical connections and high strength bolts and nuts after erection.

3. Areas damaged during erection:
a. Prepare surface for spot repairs as specified for the coating system. b. Recoat with prime coat before applying subsequent coats. c. Touch up surfaces after installation.
d. Clean and dry surfaces to be coated at time of application.

4. Coat underside of equipment bases and supports not galvanized with at least 2 coats of primer specified before setting the equipment in place.

5. Coat aluminum in contact with concrete.

3.10 APPLICATION REQUIREMENTS FOR CONCRETE COATING SYSTEMS A. Apply filler/surfacer as recommended by CSM to fill bug holes and air voids in concrete or block texture in CMU, leaving a uniformly filled surface that does not produce blowholes or outgassing causing the coating system to pinhole.

1. Allow filler/surfacers to cure sufficiently before applying prime coat as required by the CSM. Use the CSM-recommended drying time between coats.

B. Apply surfacer or filler and let dry before coating application.

1. Use the drying time between filler/surfacer and coating system specified by the CSM for the site conditions.
a. Let concrete substrate dry before applying filler/surfacers or coating system materials.

2. If the maximum recoat time is exceeded, prepare surfaces by solvent washing, light abrasive blasting, and other procedures per CSM's instructions.

Page 1307 of 3040 ends

High-Performance Coatings
09960-28 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/09960 (CONFORMED)

3. Apply a complete parge coat of the specified filler/surfacer material over the entire substrate before applying the coating system.
a. Scrub filler/surfacer into the substrate to completely fill open air voids and bug holes.
b. Completely cover the substrate, unless otherwise specified, above such filled voids by 1/8 inch of thickness.
c. Provide relatively flat, uniformly even surface before coating application.

4. Secondary containment: Place surfacer or filler 1/16 inch thick above concrete plane to create a monolithic surface free of pinholes.
a. Floor surfaces: Broadcast with aggregate to create a non-slip surface texture.
b. Remove excess aggregates and apply base coat to encapsulate embedded non-slip aggregate.

C. Concrete substrate temperatures:

1. Apply filler/surfacers and the coating system when temperatures are falling, typically late afternoon or evening.
a. Do not coat concrete with rising concrete substrate surface temperatures or substrates in direct sunlight, to minimize outgassing from the substrate and formation of pinholes, and/or blistering.

2. Should bubbles, pinholes, or other discontinuities form in the applied coating system material, they shall be repaired.
a. Should discontinuities develop in the filler/surfacer material or in the first coat of the coating material, repair them before the next coat. b. When discontinuities occur, open the air void behind or beneath the discontinuities and completely fill with specified coating material. Then, abrade the coated area around the discontinuities repair reapply coating over that area.

D. Perform application detail work in accordance with these Specifications, the CSM’s current written recommendations, and drawings, whichever is stricter.

E. Concrete coating systems application requirements:

1. Concrete coating minimum dry film thickness excludes parge coat, block filler, and sealer.

3.11 COATING SYSTEM SCHEDULE
A. Attachment A - Schedule of Surfaces to be Field Coated specifies surfaces to be coated in the field with the coating systems required.

3.12 SURFACES NOT REQUIRING COATING
A. Stainless steel piping, valves, pipe supports, instrument sunshades.

B. Sliding surfaces on expansion joints, motor and pump shafts, machined surfaces at bearings and seals, grease fittings, etc.

C. Galvanized structural steel framing, galvanized roof decking, galvanized pipe supports.

Page 1308 of 3040 ends

High-Performance Coatings
09960-29 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/09960 (CONFORMED) D. Copper and brass pipe, fittings, valves, etc.

E. Bronze valves, bearings, bushings, and fasteners.

F. Corrosion resistant special alloys: Inconel, Alloy 20, Hastelloy, etc.

G. Exterior Concrete.

H. Plastic surfaces except coat PVC, CPVC, and other plastic piping system exposed to sunlight.

I. Buried Piping that is encased in concrete or cement mortar.

3.13 QUALITY CONTROL
A. Owner-provided inspection or inspection by others does not limit the Contractor’s or CSA’s responsibilities for quality workmanship or quality control as specified or as required by the CSM’s instructions. Owner inspection is in addition to any inspection required of the Contractor.

B. Owner may perform, or contract with an inspection agency to perform, quality control inspection and testing of the coating work covered by this Section. These inspections may include the following:

1. Inspect materials upon receipt to ensure that the CSM supplied them.

2. Verify that specified storage conditions for the coating system materials, solvents, and abrasives are provided.

3. Inspect and record findings for substrate cleanliness.

4. Inspect and record pH of concrete and metal substrates.

5. Inspect and record substrate profile (anchor pattern).

6. Measure and record ambient air and substrate temperature.

7. Measure and record relative humidity.

8. Check for substrate moisture in concrete.

9. Verify that mixing of coating system materials is in accordance with CSM’s instructions.

10. Inspect, confirm, and record that coating system materials' "pot life" is not exceeded during installation. Inspect to verify that recoat limitations for coating materials are not exceeded.

11. Perform adhesion testing.

12. Measure and record the coating system's thickness.

13. Verify proper curing of the coating system in accordance with the CSM's instructions.

14. Holiday or continuity testing in accordance with NACE SP0188 for coatings that will be immersed or exposed to aggressively corrosive conditions.

C. Contractor shall perform holiday testing in accordance with NACE SP0188 to identify holidays or pinholes needing repair for coating over 100 percent of surfaces:

1. Coated steel that will be immersed or exposed to aggressively corrosive conditions.

2. Coated concrete.

3. Perform holiday tests after proper application and coating system cure.

Page 1309 of 3040 ends

High-Performance Coatings
09960-30 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/09960 (CONFORMED)

3.14 CORRECTIVE MEASURES
A. Repair pinholes or holidays identified by Holiday Testing as follows:

1. Remove the coating system with a grinder or other suitable power tool.

2. Remove coating system at all pinholes and holidays at least 2 inches diameter around the defect back to expose substrate.

3. Concrete voids: chip back to expose entire cavity in all directions. a. Completely fill void with approved filler/surfacer material using a putty knife or other suitable tool and strike off. Cure per CSM’s recommendations.

4. Aggressively abrade or sand the intact coating system surface at least 3 inches beyond the removal area in all directions to produce a uniform 6- to 8-mil profile in the intact coating system.

5. Vacuum the prepared area to remove all dust, dirt, etc., leaving clean, sound surfaces.

6. Tape to mask the periphery of the prepared intact coating area to prevent coating repair application onto the prepared area.

7. Apply the coating system with enough coats to achieve the specified finish coat thickness over the defect and coating removal area. Feather the coating onto the abraded coated surfaces around the removal area to avoid a lip and to achieve a neat repair outline.

8. Follow curing time between coats as specified by CSM for the site conditions.

Solvent wash and abrasive blast per CSM's instructions, if the maximum recoat time is exceeded.

9. Apply coating at specified dry film thickness.

3.15 CLEANUP
A. Remove surplus materials, protective coverings, and accumulated rubbish after completing coating. Thoroughly clean surfaces and repair overspray or other coating-related damage.

3.16 FINAL INSPECTION
A. Conduct final inspection of coating system work to determine whether it meets specifications requirements.

B. Conduct subsequent final inspection with Engineer to ensure work conforms to contract documents requirements.

C. Mark any rework required.

1. Re-clean and repair, as specified, at no additional cost to the Owner.

END OF SECTION

Page 1310 of 3040 ends

High-Performance Coatings
09960-Attachment A 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/09960 (CONFORMED)

ATTACHMENT A - SCHEDULE OF SURFACES TO BE COATED

Page 1311 of 3040 ends
Page 1312 of 3040 ends

A.

EPU-M-1 Metals, exterior, non-immersed
EPX-M-2 Metals, interior, non-immersed
EPX-M-3
Metals, immersed; all exterior and interior surfaces of the AWT tanks as indicated on Drawing 85S01
EPX-M-5
Aluminum surfaces in contact with concrete or masonry.

Locations where Alkali-resistant bitumastic is specified.

EPX-M-6-BG Below grade or buried pipes, valves, pits/chambers EPX-C-7-BG Below grade or buried pits/chambers
a. Doors, doorframes, ventilators, louvers, grilles, exposed sheet metal, and flashing. b. Pipe, valves, pipe hangers, supports and saddles, conduit, cable tray hangers, and supports. c. Motors and motor accessory equipment.
d. Drive gear, drive housing, coupling housings, and miscellaneous gear drive equipment. e. Valve and gate operators and stands.
f. Structural steel.
g. Crane and hoist rails.
h. Exterior of tanks and other containment vessels.
i. Mechanical equipment supports, drive units, and accessories. j. Bare electrical equipment: boxes, exposed conduit, and accessories. k. Pumps not submerged.
l. Other miscellaneous metals.
2: Immersed ferrous metal surfaces include:
a. Interior surfaces of ferrous metal tanks.
b. Field priming of ferrous metal surfaces with defective shop-prime coat; including nonsubmerged service. c. Bell rings, underside of manhole covers and frames.
d. Sump pumps, including underside of base plates and submerged suction and discharge piping.
e. Exterior of submerged piping and valves other than stainless steel or PVC piping. f. Submerged pipe supports and hangers.
g. Stem guides.
h. Other submerged iron and steel metal unless specified otherwise.

APPENDIX A
The following schedule is incomplete. Coat unlisted surfaces with same coating system as similar listed surfaces. Contact Engineer for clarification.

Schedule of Surfaces to be Coated
Notes:
1: Non-immersed ferrous metal surfaces include:
09960-1
July 12, 2023 - CONFORMED

Page 1313 of 3040 ends
Page 1314 of 3040 ends

High-Performance Coatings
09960-Attachment B 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/09960 (CONFORMED)

ATTACHMENT B - COATING DETAIL SHEETS

Page 1315 of 3040 ends
Page 1316 of 3040 ends

Coating System
Coating Material
Substrate
Products: One of the following or equal: Primer Intermediate Coat Finish Coat Carboline Carboguard 890 Carboguard 890 Carbothane 134 VOC International Paint Devran 224V Devran 224V Devthane 379H PPG Amerlock 2VOC Amerlock 2VOC Amershield VOC
Sherwin Williams Macropoxy 646 100 Macropoxy 646 100 Hi Solids Polyurethane 250 Tnemec Series 69 Series 69 Series 1095
Service Condition
Surface Preparation
General
Ferrous Metal
Nonferrous Metal
Galvanized Metal
Surface profile
Ferrous Metal
Nonferrous Metal
Galvanized Metal
System Thickness (Dry Film)
Total
Primer
Intermediate Coat
Finish Coat
Application
Special CTR Training
Appendix B
Coating Detail Sheet
EPU-M-1
Two coats epoxy with polyurethane finish coat
Metal
Interior or Exterior, subject to direct sunlight. Non-immersion.

Prepare surfaces as specified in this Section and as follows.

Bare surfaces: SSPC-SP10, Near-White Blast Cleaning.

Shop primed surfaces: SSPC-SP2, Hand Tool Cleaning or SSPC-SP3, Power Tool Cleaning.

Damaged primer or rust: SSPC-SP10, Near White Blast Cleaning and spot prime.

SSPC-SP16, Brush Blast Cleaning.

SSPC-SP16, Brush Blast Cleaning. Test for surface contaminants.

2.5 to 3.0 mils

1.5 to 2.0 mils

1.5 to 2.0 mils
10 to 13 mils
Not required.
4 to 5 mils
4 to 5 mils
2 to 3 mils
09960-2
July 12, 2023 - CONFORMED

Page 1317 of 3040 ends

Coating System
Coating Material
Substrate
Products: One of the following or equal: Primer Intermediate Coat Finish Coat Carboline Carboguard 890 Carboguard 890 Carboguard 890
International Paint Bar-Rust 236 Bar-Rust 236 Bar-Rust 236 PPG Amerlock 2/400 Series Amerlock 2/400 Series Amerlock 2/400 Series Sherwin Williams TankClad HS TankClad HS TankClad HS
Tnemec Series 69 Series 69 Series 69
Service Condition
Surface Preparation
General
Ferrous Metal
Nonferrous Metal
Galvanized Metal
Surface profile
Ferrous Metal
Nonferrous Metal
Galvanized Metal
System Thickness (Dry Film)
Total
Primer
Intermediate Coat
Finish Coat
Application
Special CTR Training
SSPC-SP16, Brush-Off Blast Cleaning.

Metal
Immersed, non-immersed, moderately corrosive environment.

Prepare surfaces as specified in this Section and as follows.

Bare surfaces: SSPC-SP5, White Metal Blast Cleaning.

Shop primed surfaces: SSPC-SP7, Brush-Off Blast Cleaning.

Damaged primer or rust: SSPC-SP5, White Metal Blast Cleaning and spot prime.

SSPC-SP16, Brush-Off Blast Cleaning.

1.0 to 1.5 mils
2 to 4 mils

1.0 to 1.5 mils
Appendix B
Coating Detail Sheet
EPX-M-2
Epoxy
4 to 6 mils
4 to 6 mils
Not required.
12 to 16 mils
4 to 6 mils
09960-3
July 12, 2023 - CONFORMED

Page 1318 of 3040 ends

Coating System
Coating Material
Substrate
Products: One of the following or equal: Primer Intermediate Coat Finish Coat Carboline Carboguard 891VOC Carboguard 891VOC Carboguard 891VOC International Paint Bar-Rust 236 Bar-Rust 236 Bar-Rust 236 PPG Amercoat 240 Amercoat 240 Amercoat 240
Sherwin Williams Tank Clad HS Tank Clad HS Tank Clad HS Tnemec Series 104 Series 104 Series 104
Service Condition
Surface Preparation
General
Ferrous Metal
Nonferrous Metal
Galvanized Metal
Surface profile
Ferrous Metal
Nonferrous Metal
Galvanized Metal
System Thickness (Dry Film)
Total
Primer
Intermediate Coat
Finish Coat
Application
Special CTR Training
Appendix B
Coating Detail Sheet
EPX-M-3
Epoxy

2.5 to 3.0 mils

1.5 to 2.0 mils
SSPC-SP16, Brush-Off Blast Cleaning.

SSPC-SP16, Brush-Off Blast Cleaning.

Metal
Immersed; non-immersed, corrosive environment.

Not for Biogenic Sulfide Corrosion areas in wastewater.

Prepare surfaces as specified in this Section and as follows.

Bare surfaces: SSPC-SP5, White Metal Blast Cleaning.

Shop primed surfaces: SSPC-SP7, Brush-Off Blast Cleaning.

Damaged primer or rust: SSPC-SP5, White Metal Blast Cleaning and spot prime.

Not required.
4 to 8 mils

1.5 to 2.0 mils
4 to 8 mils
16 to 20 mils
4 to 8 mils
09960-4
July 12, 2023 - CONFORMED

Page 1319 of 3040 ends

Coating System
Coating Material
Substrate
Products: One of the following or equal: Primer Intermediate Coat Finish Coat Carboline CSM recommended None applied Carbomastic 15
International Paint CSM recommended Bar-Rust 231LV Bar-Rust 231LV PPG No product specified No product specified No product specified Sherwin Williams CSM recommended No product specified No product specified Tnemec CSM recommended Series 135 Series 135
Service Condition
Surface Preparation
General
Ferrous Metal
Nonferrous Metal
Surface profile
Ferrous Metal
Nonferrous Metal
System Thickness (Dry Film)
Total
Primer
Finish Coat
Application
Special CTR Training
Appendix B
Coating Detail Sheet
EPX-M-5
Epoxy mastic
Metal
Interior, corrosive environment, confined enclosures, where minimal surface preparation is possible.

Prepare surfaces as specified in this Section and as follows.

Bare surfaces: SSPC-SP11, Power to Cleaning to Bare Metal.

Shop primed surfaces: SSPC-SP3, Power Tool Cleaning.

Damaged primer or rust: SSPC-SP11, Power to Cleaning to Bare Metal.

SSPC-SP16, Brush-Off Blast Cleaning.

Not Required.

1.0 to 1.5 mils

2.0 to 2.5 mils
15 to 19 mils
2 to 4 mils
15 mils
09960-5
July 12, 2023 - CONFORMED

Page 1320 of 3040 ends

Coating System
Coating Material
Substrate
Products: One of the following or equal: Primer Intermediate Coat Finish Coat Carboline Carboguard 890 Carboguard 890 Carboguard 890
International Paint Bar-Rust 236 Bar-Rust 236 Bar-Rust 236 PPG Amerlock 400 Amerlock 400 Amerlock 400
Sherwin Williams No product specified No product specified No product specified Tnemec Series 69 Series 69 Series 69
Service Condition
Surface Preparation
General
Ferrous Metal
Nonferrous Metal
Galvanized Metal
Surface profile
Ferrous Metal
Nonferrous Metal
Galvanized Metal
System Thickness (Dry Film)
Total
Primer
Intermediate Coat
Finish Coat
Application
General
Special CTR Training
Appendix B
Coating Detail Sheet
EPX-M-6-BG
Epoxy
Metal
Below grade in contact with soil.

Prepare surfaces as specified in this Section and as follows.

SSPC-SP10, Near White Metal Blast Cleaning.

2.5 to 3.0 mils

1.5 to 2.0 mils
SSPC-SP16, Brush-Off Blast Cleaning.

SSPC-SP16, Brush-Off Blast Cleaning.
16 mils
4 to 6 mils
4 to 6 mils

1.5 to 2.0 mils
4 to 6 mils
Fill all bugholes with a filler/surfacer compatible with the coating.

Not Required.
09960-6
July 12, 2023 - CONFORMED

Page 1321 of 3040 ends

Coating System
Coating Material
Substrate
Products: One of the following or equal: Primer Intermediate Coat Finish Coat Carboline Carboguard 890 Carboguard 890 Carboguard 890
International Paint Bar-Rust 236 Bar-Rust 236 Bar-Rust 236 PPG Amerlock 400 Amerlock 400 Amerlock 400
Sherwin Williams Tank Clad HS Tank Clad HS Tank Clad HS Tnemec Series 69 Series 69 Series 69
Service Condition
Surface Preparation
General
Surface profile
Concrete
Existing Coated Concrete
System Thickness (Dry Film)
Total
Primer
Intermediate Coat
Finish Coat
Application
General
Special CTR Training
ICRI CSP 3.

ICRI CSP 3.

Appendix B
Coating Detail Sheet
EPX-C-7-BG
Polyamidoamine epoxy or epoxy coating type with similar performance Concrete
Below grade in contact with soil.

Prepare surfaces as specified in this Section and as follows. 16 mils
4 to 6 mils
4 to 6 mils
Fill all bugholes with a filler/surfacer compatible with the coating.

Not Required.
4 to 6 mils
09960-7
July 12, 2023 - CONFORMED

Page 1322 of 3040 ends

Painting Prestressed Concrete Water Tanks
09986-1 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/09986 (CONFORMED) SECTION 09986

PAINTING PRESTRESSED CONCRETE WATER TANKS
PART 1 GENERAL

1.01 SUMMARY
A. Section includes: Painting and coatings for prestressed concrete water tanks.

1.02 REFERENCES
A. Military Specifications (MS):

1. MIL-P-23236 - Paint Coating Systems, Fuel and Salt Water Ballast Tanks.

B. Society for Protective Coatings (SSPC):

1. SP-1 - Solvent Cleaning.

C. United States Navy (USN):

1. QPL/QMLs - Qualified Products/Manufacturers Lists.

1.03 SUBMITTALS
A. Product data.

B. Quality control submittals.

1.04 QUALITY ASSURANCE
A. Qualifications of off-site applicator of coal tar epoxy: Will not be allowed unless by applicator with proven, documented, experience acceptable to Engineer in application of coal tar epoxy systems.

1.05 PROJECT CONDITIONS
A. Environmental requirements:

1. Application of coal tar epoxy: Do not apply coal tar epoxy when ambient and/or surface temperature is less than 50 degrees Fahrenheit.

Page 1323 of 3040 ends

Painting Prestressed Concrete Water Tanks
09986-2 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/09986 (CONFORMED) PART 2 PRODUCTS

2.01 MATERIALS
A. Prestressed Concrete Tank Shotcrete Finish Painting: Non-Cementitious, high build, 100-percent acrylic resin polymer:

1. Tnemec: Envirocrete 156.

2. Sherwin Williams: Loxon XP WP.

B. Prestressed Concrete Tank Roof Coating: Type II asphalt conforming to ASTM D449 and gravel.AD3
B. Prestressed Concrete Tank Roof Coating: Non-cementitious, high build, 100 percent acrylic resin polymer:

1. Tnemec: Envirocrete 156.

2. Sherwin Williams: Loxon XP WP.AD3

2.02 MIXES
A. Mix in accordance with manufactures instructions.

PART 3 EXECUTION

3.01 PREPARATION
A. Surface preparation: For surfaces designated to be painted:

1. General: Prepare surfaces in accordance with manufacturer’s installation instructions.

Surface Preparation Number Surface Preparation Process
SP-1 Painting Concrete And Shotcrete: Remove form release agents from poured or precast surfaces by sandblasting or as recommended by paint manufacturer.

3.02 PRESTRESSED CONCRETE TANK SHOTCRETE FINISH PAINTING A. Preparation: Prepare surfaces in accordance with general application requirements and in strict accordance with coating manufacturer’s instructions.

B. Application:

1. Apply primer if required by coating manufacturer.

2. Apply 2 or more coats as recommended by coating manufacturer to receive a minimum total DFT of 12 mils; color as selected by the Owner.

3. Apply finish paint to a depth of one foot below finish grade.

3.03 PRESTRESSED CONCRETE ROOF COATING
A. Preparation:

1. Prepare surfaces in accordance with general application requirements and in strict accordance with coating manufacturer’s instructions.

Page 1324 of 3040 ends

Painting Prestressed Concrete Water Tanks
09986-3 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/09986 (CONFORMED) B. Application:

1. Apply suitable concrete primer.

2. Cover with Type II asphalt, conforming to ASTM D449, at a minimum rate of 60 lbs per 100 sqft.

3. While the asphalt is still hot embed an approved gravel or small rock at the rate of approximately 10 psf.

3.04 FIELD QUALITY CONTROL
A. Inspection:

1. Coal tar epoxy paints: Check film thickness after application and before coating has cured to be sure that sufficient coating thickness has been applied before coal tar epoxy coating is allowed to set overnight.

3.05 ADJUSTING
A. Remedial work for coal tar epoxy coatings:

1. Non-conformance with application or thickness requirements:
a. If surface coatings are not applied in accordance with following:
1) Time limits listed in Table A in this Section or,
2) Coatings have cured or set and,
3) Coatings have not been applied to specified thickness, then areas that are below specified thickness requirements are to be sandblasted.
b. Sandblasting:
1) Sandblast as required to remove surface film from coatings. 2) Sandblasted areas:
a) Wash and clean with solvent as recommended by manufacturer, and then recoat within time limits specified for coating over fresh coating.
b) Washing or cleaning surface of paint with solvents or other solutions will not be satisfactory substitute for specified sandblasting where painted surface is older than time limits listed in Table A in this Section.

2. In event that recoating of overage coated surface occurs without sandblasting and solvent treatment specified in this article: Entire painting system, down to substrate, is to be removed by sandblasting or other means, and complete new painting system applied.

END OF SECTION
AD3 Addendum No. 3

Page 1325 of 3040 ends
Page 1326 of 3040 ends

Signage
10400-1 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/10400 (CONFORMED) SECTION 10400

SIGNAGE
PART 1 GENERAL

1.01 SUMMARY
A. Section includes: Plastic and metal signs for building and site use.

1.02 REFERENCES
A. National Fire Protection Association (NFPA):

1. 704 - Standard System for the Identification of the Hazards of Materials for Emergency Response.

B. Occupational Safety and Health Administration (OSHA).

1.03 SUBMITTALS
A. Product data.

B. Shop drawings: Include lists of sign types, sizes, text, and colors; mounting details; locations; and cast metal plaque rubbings and templates.

C. Samples: Include actual materials.

D. Manufacturer's installation instructions.

1.04 QUALITY ASSURANCE
A. Manufacturer qualifications: Manufacturer of proposed products for minimum 5 years with satisfactory performance record of minimum 5 years.

B. Installer qualifications: Manufacturer approved installer of products similar to specified products on minimum 10 projects of similar scope as Project with satisfactory performance record.

C. Regulatory requirements: Provide signage in accordance with Americans with Disabilities Act as published in the Federal Register, Volume 56, No. 144, Friday, July 26, 1991.

Page 1327 of 3040 ends

Signage
10400-2 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/10400 (CONFORMED) PART 2 PRODUCTS

2.01 PLASTIC SIGNAGE SYSTEM
A. Manufacturers:

1. One of the following or equal:
a. Best Manufacturing Sign Systems, System 900013.
b. Andco Industries Corp., equivalent product.
c. Vomar Products, Inc., equivalent product.

B. Attachment:

1. Vinyl tape, self-adhering.

C. Lettering:

1. Helvetica medium, 3/4 inches high.

D. Material for interior use:

1. Plastic 1/8-inch-thick raised letters.

E. Material for exterior use:

1. Fiberglass 1/4-inch thick with high gloss finish, raised letters, blasted from single piece of fiberglass for integral letter and background.

2. No adhesive as mechanical fastening of letters shall be allowed.

F. Colors:

1. As selected by Engineer from manufacturer's standard colors.

G. See Attachment A - Plastic Signage System Schedule for specific sign size, location, text, pictogram, and quantity.

2.02 METAL SAFETY SIGNS
A. Manufacturer: Meeting OSHA Requirements; 40-mil thick aluminum with baked enamel finish. One of the following or equal:

1. Seton Name Plate Co., Special Wording.

2. Emedco.

B. Danger sign colors:

1. Background: White.

2. Heading: White lettering on red oval with white border in black rectangular panel.

3. Message: Black lettering on white.

4. Size: As scheduled.

C. Caution sign colors:

1. Background: Yellow.

2. Heading: Yellow lettering on black rectangular panel.

3. Message: Black lettering on yellow.

4. Size: As scheduled.

Page 1328 of 3040 ends

Signage
10400-3 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/10400 (CONFORMED) D. Safety instruction signs:

1. Background: White.

2. Heading: White lettering on green rectangular panel.

3. Message: Black lettering.

4. Size: As scheduled.

E. Warning sign colors:

1. Background: Orange.

2. Heading: Black lettering on orange diamond in black rectangular panel.

3. Message: Flack lettering on orange.

4. Size: As scheduled.

F. Notice information signs:

1. Background: White.

2. Heading: White lettering on blue rectangular panel.

3. Message: Black lettering.

4. Size: As scheduled.

G. Fasteners: Round head stainless steel bolts or screws.

H. See Attachment B - Metal Safety Sign Schedule for specific sign size, location, text, and quantity.

2.03 EXTERIOR INFORMATION SIGNS
A. Able to withstand 100 miles per hour wind load without damage:

1. Manufacturers: One of the following or equal:
a. Best Manufacturing Sign Systems; equivalent product. b. Andco Industries Corp., equivalent product.
c. Vomar Products, Inc., equivalent product.

B. Sign panel: Nominal 3 inches thick, consisting of 1/8-inch-thick fiberglass material with integral returns fully encapsulating wood and foam core, 1/8-inch radius edges and corners, size as indicated on the Drawings.

C. Text: Helvetica medium, size and wording as indicated on the Drawings.

D. Posts: Nominal 3-inch square extruded aluminum sections with aluminum fillers at top and bottom, mounting hardware, and aluminum baseplates drilled for anchor bolts.

E. Fasteners: Manufacturer's standard, suitable for application.

F. Colors: As selected from manufacturer's standard colors.

2.04 CAST METAL PLAQUE
A. Manufacturers: One of the following or equal:

1. Andco Industries Corp.

2. Southwell Co.

3. ARK-RAMOS Inc.

Page 1329 of 3040 ends

Signage
10400-4 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/10400 (CONFORMED) B. Material: Cast bronze.

C. Size: Approximately 28 by 34 inches by minimum 3/16 inches thick; lettering, center panel, and trim raised 1/8 inch.

D. Lettering: Text as directed by Engineer. Verify before fabrication.

E. Finishes:

1. Lettering, center panel, and trim: Fine satin.

2. Background: Finely pebbled, oxidized to dull black color.

F. Mounting: Concealed with fasteners.

2.05 HAZARD MATERIAL SIGNALS
A. Manufacturer: One of the following or equal:

1. Seton Name Plate Co.

2. Emedco.

B. Hazard material signals: In accordance with NFPA 704; 40-mil thick aluminum with baked enamel finish panels, letters, and symbols with pressure sensitive adhesive, sizes as required for viewing distances, letters and symbols in accordance with Attachment C - Hazard Material Signals.

2.06 CAST ALUMINUM LETTERS
A. Manufacturers:

1. One of the following or equal:
a. Metal Arts.
b. Southwell Co.
c. OMC Industries.

B. Material:

1. Cast aluminum.

C. Text size and font:

1. As indicated on the Drawings.

D. Finish:

1. Black duranodic coating.

E. Mounting:

1. Projected jamb nut mounting, concealed.

2.07 DECAL SIGNS ON GLASS
A. Provide decal signs of the international symbol for accessibility, in accordance with requirements of CBC 1127B.3 for entry signs. Signs to comply with CBC 1117B.5 through 1117B.5.9. Locate signs as follows:

1. Door or sidelight of Door No.

Page 1330 of 3040 ends

Signage
10400-5 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/10400 (CONFORMED) PART 3 EXECUTION

3.01 PREPARATION
A. Protect adjacent surfaces which may be damaged by installation of signs.

B. Prepare substrates in accordance with sign manufacturer's instructions.

C. Remove scale, dirt, grease, and other contaminates from substrates.

3.02 INSTALLATION
A. Install signs in accordance with sign manufacturer's instructions.

B. Fasten signs securely in level, plumb, and true to plane positions.

C. Install signs where indicated on the Drawings.

END OF SECTION

Page 1331 of 3040 ends
Page 1332 of 3040 ends

Signage
10400-Attachment A 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/10400 (CONFORMED)

ATTACHMENT A - PLASTIC SIGNAGE SYSTEM SCHEDULE

Page 1333 of 3040 ends
Page 1334 of 3040 ends

Signage
10400-Attachment A-1 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/10400 (CONFORMED)

PLASTIC SIGNAGE SYSTEM SCHEDULE
A. Room Names:

1. Location: On wall outside room adjacent to latch side of doors or when not enough space on latch side, on nearest adjacent wall.

2. Height: 60 inches above floor to center or sign.

3. Size: 6 inches square.

4. Colors: As selected by Engineer.

5. Text: Sign per door describing room function as indicated on the Drawings.

B. Fire Extinguishers:

1. Location: Adjacent to fire extinguishers.

2. Height: 60 inches above floor to center of sign.

3. Size: 6 inches square.

4. Colors: White letters on OSHA Red background.

5. Text: FIRE EXTINGUISHER.

C. Nonpotable Water:

1. Location: At impure water and nonpotable water hose valves in accordance with Typical Detail M276.

2. Height: In accordance with Typical Detail.

3. Size: 10 inches wide by 7 inches high.

4. Heading: CAUTION

5. Text: IMPURE WATER

DO NOT DRINK

Page 1335 of 3040 ends
Page 1336 of 3040 ends

Signage
10400-Attachment B 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/10400 (CONFORMED)

ATTACHMENT B - METAL SAFETY SIGN SCHEDULE

Page 1337 of 3040 ends
Page 1338 of 3040 ends

Signage
10400-Attachment B-1 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/10400 (CONFORMED)

METAL SAFETY SIGN SCHEDULE
A. CHLORINATION AND SULFONATION EQUIPMENT:

1. Location: Adjacent to exterior doors and gate of Chlorination-Dechlorination building.

2. Size: 14 inches wide by 10 inches high.

3. Heading: CAUTION

4. Wording: CHLORINATION AND SULFONATION EQUIPMENT

DANGEROUS GAS
B. NONPOTABLE WATER:

1. Location: At impure water and nonpotable water hose valves in accordance with Typical Detail M276.

2. Height: In accordance with Typical Detail.

3. Size: 10 inches wide by 7 inches high.

4. Heading: DANGER

5. Wording: DO NOT DRINK THIS WATER
C. REMOTELY CONTROLLED AUTOMATIC EQUIPMENT:

1. Location: On front and back of equipment that starts automatically by remote control.

2. Heading: DANGER

3. Wording: THIS EQUIPMENT STARTS AUTOMATICALLY

BY REMOTE CONTROL
D. HIGH VOLTAGE WARNING:

1. Location: On front and back of equipment, adjacent to doors to rooms containing devices, and devices that operate at 600 volts or greater.

2. Heading: DANGER

3. Wording: HIGH VOLTAGE

KEEP OUT
E. NO SMOKING INFORMATIONAL SIGNS:

1. Location: On exterior face of wall, adjacent to each entry point (exterior door) to all buildings.

2. Height: 60 inches above floor to center of sign. Where metal safety signs are also located adjacent to entry points, place no smoking signs below these signs.

3. Size: 6 inches square.

4. Heading: None.

5. Wording: None.

6. Pictogram: International “No Smoking” symbol.

F. NO SMOKING WITHIN 25 FEET OF BUILDING ENTRY:

1. Location: As indicated on the Drawings.

2. Height: Pole mounted with top of sign at 5 feet above grade.

3. Size: 14 inches wide by 10 inches high.

4. Heading: NOTICE

5. Wording: NO SMOKING WITHIN 25 FEET OF BUILDING.

6. Pictogram: International “No Smoking” symbol.

Page 1339 of 3040 ends

Signage
10400-Attachment B-2 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/10400 (CONFORMED) G. ACCESSIBLE PARKING SIGN (POST MOUNTED AND REFLECTORIZED):

1. Location: Centered on the parking space reserved for persons with disabilities in accordance with UBC 1129B5.

2. Height: 60 inches from the bottom of sign to parking space finished grade, in accordance with UBC 1129B5.

3. Size: Not smaller than 70 square inches.

4. Wording: As required to suit local regulations.

5. Pictogram: Symbol of accessibility in white on dark blue.

Page 1340 of 3040 ends

Signage
10400-Attachment C 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/10400 (CONFORMED)

ATTACHMENT C - HAZARD MATERIAL SIGNALS

Page 1341 of 3040 ends
Page 1342 of 3040 ends

Signage
10400-Attachment C-1 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/10400 (CONFORMED)

HAZARD MATERIAL SIGNALS
A. HAZARD SIGNAL FOR FERRIC CHLORIDE 35 - 45 PERCENT:

1. Location: At entrances to locations where stored and on storage tanks.

2. Health: 3

3. Flammability: 0

4. Reactivity: 0

5. Special: -

Page 1343 of 3040 ends
Page 1344 of 3040 ends

Fire Protection Specialties
10520-1 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/10520 (CONFORMED) SECTION 10520

FIRE PROTECTION SPECIALTIES
PART 1 GENERAL

1.01 SUMMARY
A. Section includes: Fire extinguishers and cabinets.

1.02 REFERENCES
A. ASTM International (ASTM):

1. E814-11a - Standard Test Method for Fire Tests of Penetration Firestop Systems.

B. National Fire Protection Association (NFPA):

1. 10 - Standard for Portable Fire Extinguishers.

C. Underwriters Laboratories, Inc. (UL):

1. 711 - Rating and Fire Testing of Fire Extinguishers.

1.03 SUBMITTALS
A. Product data.

1. Cabinets: Materials description for fire extinguisher cabinets include roughing-in dimensions, details showing mounting methods, relationships to surrounding construction, door hardware cabinet type and materials, trim style and door construction, door style and materials.

2. Extinguishers: Materials description for fire extinguishers; include ratings and classifications.

3. Installation instructions for each product specified.

B. Shop drawings:

1. Small-scale plans showing locations of fire extinguisher cabinets and individual fire extinguishers.

2. Schedule showing each type of cabinet and extinguisher to ensure proper fit and function.

3. Indicate installation procedures and accessories required for a complete installation.

1.04 QUALITY ASSURANCE
A. Manufacturer qualifications: Minimum 5 years with satisfactory performance record.

1.05 WARRANTY
A. As specified in Section 01783 - Warranties and Bonds.

Page 1345 of 3040 ends

Fire Protection Specialties
10520-2 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/10520 (CONFORMED) PART 2 PRODUCTS

2.01 MANUFACTURERS
A. The following or equal:

1. Activar Construction Products Group – JL Industries.

2.02 FIRE EXTINGUISHERS
A. Multi-purpose chemical type:

1. Extinguisher unit containing a fluidized and siliconized mono ammonium phosphate powder; nonconductive and nontoxic.

2. Construction: Heavy duty steel cylinder with metal valve and siphon tube, o-ring seal, replaceable valve stem seal, visual pressure gage, pull pin and upright squeeze grip.

3. Finish: Factory powder-coated: Red.

4. UL Effectiveness Rating in accordance with UL 711: Class A, B, and C fires.

5. UL Rating in accordance with UL 711: 4A-80BC.

6. Drawing will use the symbol FE for “Fire Extinguisher”.

B. Regular dry chemical type:

1. Extinguisher unit containing Halotron™.

2. Size minimum: 11 pounds.

3. Construction: Heavy duty steel cylinder with metal valve and siphon tube, o-ring seal, replaceable valve stem seal, visual pressure gage, pull pin, and upright squeeze grip.

4. Finish: Factory powder-coated; Red.

5. UL Effectiveness Rating in accordance with UL 711: Class B and C fires.

6. UL Rating in accordance with UL 711: 2A-10BC.

7. Drawing will use the symbol EFE for “Electrical Fire Extinguisher”.

2.03 WALL BRACKETS
A. Type: Standard as manufactured by fire extinguisher manufacturer.

2.04 EXTRA MATERIALS
A. Furnish a minimum 10 percent, but not less than 1, of fire extinguishers with brackets installed in addition to the number indicated on the Drawings.

PART 3 EXECUTION

3.01 INSTALLATION
A. Install in accordance NFPA 10, Standard for Portable Fire Extinguishers.

Page 1346 of 3040 ends

Fire Protection Specialties
10520-3 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/10520 (CONFORMED)

3.02 LOCATIONS
A. Install fire extinguisher type, FE and EFE, as indicated on the Drawings.

B. Install fire extinguisher mounting in cabinets or wall brackets as indicated on the Drawings.

END OF SECTION

Page 1347 of 3040 ends
Page 1348 of 3040 ends

Shade Fabric
10732-1 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/10732 (CONFORMED) SECTION 10732

SHADE FABRIC
PART 1 GENERAL

1.01 SUMMARY
A. Work included: Fabricate, and install shade fabric on the structure as detailed including:

1. Fabricated shade panels.

2. Stainless steel cables.

3. Clamping.

4. Fasteners.

1.02 REFERENCES
A. ASTM International (ASTM):

1. A307 - Standard Specification for Carbon Steel Bolts and Studs, 60 000 PSI Tensile Strength.

2. F593 - Standard Specification for Stainless Steel Bolts, Hex Cap Screws, and Stops.

3. F3125 - Standard Specification for High Strength Structural Bolts, Steel and Alloy Steel, Heat Treated, 120 ksi and 150 ksi Minimum Tensile Strength.

1.03 QUALITY ASSURANCE
A. Fabrication and erection is limited to firms with proven experience in design and construction of fabric shade structures and such firms shall meet the following minimum requirements:

1. A single Contractor shall manufacture and erect the fabric shade.

2. The Contractor shall demonstrate to have a minimum of 10 years of experience in the engineering, fabrication, and erection of permanent fabric structures.

3. Contractor shall demonstrate that it has a staff of experienced fabric structure installation personnel who will undertake the installation of each project.

1.04 WARRANTY
A. After final payment, the Contractor shall furnish the Owner with a written 10-year warranty, which warrants that the fabric panels (cloth, stitching, and fading), its perimeter attachment system, and the structural support systems supplied and installed by the subcontractor has been installed in accordance with the project and manufacturer's specifications and will be free from defects in materials and workmanship which will impair its normal use or service.

1. The warranty shall extend from the date of substantial completion of the fabric panel shade structure, specifically the first date on which the entire fabric panel system is subject to design pre-stress conditions.

Page 1349 of 3040 ends

Shade Fabric
10732-2 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/10732 (CONFORMED)

1.05 SUBMITTALS
A. Contractor shall submit drawings and calculations showing the design meets all code provisions.

B. Calculations shall include the fabric attachment and tensioning.

PART 2 PRODUCTS

2.01 MANUFACTURERS/FABRICATORS
A. The following or equal:

1. Sun Ports International, Inc.

2.02 DESIGN AND PERFORMANCE CRITERIA
A. Comply with the requirements of the building code specified in Section 01410 - Regulatory Requirements.

B. Design and fabricate shade fabric and support system for resistance to the following loads as specified in Section 01850 - Design Criteria:

1. Seismic loading

2. Wind loading, based on the requirements for "components and cladding." C. Shade fabric shall be flame-resistant.

D. Life safety:

1. Fabric shade structures shall be designed so no life safety issue is created in the event of a loss of a part of the fabric.

2. The fabric structure shall not rely on the fabric for structural stability.

2.03 MATERIALS
A. Erection hardware:

1. Bolt and fastening hardware shall be determined based on calculated engineering loads.

2. Specifications, based on the following load requirements are:
a. Low strength: ASTM F593 stainless steel bolts, nuts, and washers. b. Medium strength: ASTM A307 zinc-plated steel bolts, nuts, and washers. c. High strength: ASTM F3125, Grade A325 zinc-plated steel bolts, nuts, and washers.

B. Cable:

1. Steel cable is a determined based on calculated engineering load. a. For light and medium loads: 1/4-inch (nominal) galvanized 7 by 19 cable is used.
b. For heavy loads: 3/8-inch (nominal) galvanized 7 by 19 cable is used.

Page 1350 of 3040 ends

Shade Fabric
10732-3 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/10732 (CONFORMED) C. Thread:

1. GoreTM TENARA® sewing thread is made up of 100 percent expanded polytetrafluorethylene fiber, known as Teflon™.
a. The sewing thread carries a 10-year warranty against deterioration from exposure to the elements.

2. Shall be high strength and low shrinkage.

3. Shall have a wide temperature and humidity range.

4. Flew and abrasion resistant and ultraviolet radiation immunity.

5. Shall be unaffected by cleaning agents, acid rain, mildew, rot, chlorine, saltwater, and pollution.

6. Lockstitch thread: 1200 Denier or approved equal.

7. Chainstitch thread: 2400 Denier or approved equal.

D. Edge details:

1. Perimeter shall contain cables and be double lock stitched. a. The cable shall be contained in a non-tear cloth edge firmly sewed to the fabric.

2. Brass grommets spaced at one foot centers shall be installed inside the cable and in the non-tear edge.

E. Fabric:

1. Raw material:
a. Shadesure® High Density Polyethylene (or equal).
b. Special chemicals for ultraviolet stability.

2. Construction:
a. Monofilament tape construction.

3. Fabric panel material:
a. Cloth shall be made of Shadesure® high density polyethylene cloth with ultraviolet stabilizer treatment (or equal).
b. Color shall be as selected by Engineer.
1) Red is not acceptable.
c. The material shall be manufactured with tensioned fabric structures in mind.

Page 1351 of 3040 ends

Shade Fabric
10732-4 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/10732 (CONFORMED) d. The fabric knit is to be made using monofilament and tape filler which has weight of 0.6 ounce per square foot.
1) Material to be Rachel knitted so material will not unravel if cut. e. Burst strength of 35 pounds per square inch.

Finish Stentored
Shade Protection 80 percent
UV Protection 90 percent
Tear Tests (lbs) Warp 200
Weft 450 pounds
Fabric Weight (oz/m2) 6.9
Life Expectancy 12 years in sun
Fading Minimum fading after 10 years
Temperature -22 degrees Fahrenheit
Maximum Temperature + 176 degrees Fahrenheit
F. Rope:

1. Polypropylene rope: Polypropylene rope for lacing the shade to the frame shall be ultraviolet resistant and have sufficient capacity to carry the weight of the shade, tension force and any wind and live loads applied to the fabric panel.

PART 3 EXECUTION

3.01 INSTALLATION AND SAFETY PROCEDURES
A. The Contract Work to be performed shall consist of furnishing all labor, materials, equipment, parts, and supplies necessary for installation.

B. Shade shall be attached to steel pipe frame using polypropylene rope.

1. Shade shall be taut and be sloped to drain as indicated on the Drawings.

END OF SECTION

Page 1352 of 3040 ends

Liquid Chemical Diaphragm-Type Metering Pumps General
11242-1 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/11242 (CONFORMED) SECTION 11242

LIQUID CHEMICAL DIAPHRAGM-TYPE METERING PUMPS
PART 1 GENERAL

1.01 SUMMARY
A. Section includes: Positive displacement, diaphragm metering pumps; accessories, drives, and control panel requirements for pumping chemical solutions.

B. Tag numbers:

1. As specified in Pump Schedule.

1.02 REFERENCES
A. Instrumentation Controls Specialty Contractor (ICSC).

B. International Society of Automation (ISA):

1. ISA5.4 - Instrument Loop Diagrams.

C. National Electrical Code (NEC).

D. National Electrical Manufacturer's Association (NEMA):

1. 250 - Enclosures for Electrical Equipment (1000 V Maximum).

E. NSF International (NSF):

1. 61 - Drinking Water System Components - Health Effects.

F. Underwriters Laboratories, Inc. (UL):

1. 508 - Standard for Industrial Control Equipment.

2. 508A - Standard for Industrial Control Panels.

3. 698A – Standard for Industrial Control Panels Relating to Hazardous (Classified) Locations.

4. 1283 - Standard for Electromagnetic Interference Filters.

5. 1449 - Surge Protective Devices.

1.03 SUBMITTALS
A. Submit as specified in Section 01330 - Submittal Procedures.

B. Product data: As specified in Section 15050 - Common Work Results for Mechanical Equipment.

1. Design data, test reports, certificates, manufacturer’s instructions, manufacturer’s field reports:
a. Chemical feed pumps:
1) For each pump type, submit calibration charts and tables relating flow rate to stroke length and stroke rate.

Page 1353 of 3040 ends

Liquid Chemical Diaphragm-Type Metering Pumps General
11242-2 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/11242 (CONFORMED) 2) Submit hydraulic modeling results for each pumping system. a) Confirm scheduled values or recommend new pressure
setpoints for the backpressure valves and pressure relief valves listed in the Pump Schedule.
3) Submit calculations for each metering pump showing the suitability of each pump for the suction and discharge conditions of each application point.
a) Pump manufacturer shall recommend and size an accumulator to be piped to the suction side of each metering pump, when required based on calculations.
4) Submit calculations recommending dimensions of pulsation dampener indicated on the Drawings.

C. Shop drawings: As specified in Section 15050 - Common Work Results for Mechanical Equipment.

1. Provide a list of parameters, ratings, or other characteristics where the proposed chemical feed systems deviate from the requirements.

2. Dimensions, including anchor bolt layout, materials of construction, size, weight, and performance data.

3. Drawings: Provide electrical and instrumentation drawings showing coordination with electrical control devices operating in conjunction with the associated feed system.

4. Dimensioned inlet and outlet connections.

5. Current NSF 61 Certification for components to be in contact with associated chemical or potable water.

6. Provide data showing chemical compatibility and history of service with the associated chemical for materials in the system.

7. Control panel views showing equipment arrangement, doors, equipment layout inside the panel and dimensional information.

8. Internal interconnecting wiring diagrams showing terminal strips and external devices connected to the panel as specified in Section 17050 - Common Work Results for Process Control and Instrumentation Systems.

9. Loop drawings for analog and discrete signals in accordance with ISA5.4.

10. Complete schematic and diagrams including terminal block and wire identification numbers and device location symbols consistent with the Contract Documents.

11. Panel bill of material with detailed description of components and equipment data sheets.

12. Field cable numbers and terminations.

13. Manufacturer’s Representative’s qualifications as specified in Section 01756 - Commissioning.

14. Manufacturer’s certificate stating that the materials of construction are compatible with the pumped fluid.

15. Manufacturer’s Certificate of Source Testing as specified in Section 01756 - Commissioning.

16. Manufacturer’s Certificate of Installation and Functionality Compliance as specified in Section 01756 - Commissioning.

17. Calibration curves for each pump relating stroke length to flow rate shall be supplied.

Page 1354 of 3040 ends

Liquid Chemical Diaphragm-Type Metering Pumps General
11242-3 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/11242 (CONFORMED)

18. Capacity control shall be 0 to 100 percent with delivery repeatable within plus or minus 1 percent accuracy over at least a 10 to 1 range.

19. Motor and VFD supplier shall carefully review the intended application of the VFD and certify in writing that sizes provided are adequate for continuous or intermittent operations (whichever is the most severe operating condition.

D. Calculations: As specified in Section 15050 - Common Work Results for Mechanical Equipment.

E. Vendor operation and maintenance manuals: As specified in Section 01782 - Operation and Maintenance Manuals.

1. Provide information on each piece of equipment, including instrumentation.

2. Provide all safety considerations relating to operations and handling of the associated chemical.

3. Maintenance data shall include all information and instructions required by plant personnel to keep equipment properly cleaned, lubricated, and adjusted so that it functions economically throughout its full design life.

4. Lubrication charts and tables of alternate lubricants.

5. Name, address, and phone number of manufacturer and manufacturer’s local service representative.

F. Commissioning submittals:

1. Provide Manufacturer’s Certificate of Source Testing as specified in Section 01756 - Commissioning.

2. Provide Manufacturer’s Certificate of Installation and Functionality Compliance as specified in Section 01756 - Commissioning.

1.04 WARRANTY
A. Provide warranty as specified in Section 01783 - Warranties and Bonds.

B. Special warranty:

1. Provide an additional 2 years manufacturer’s warranty, issued in the name of the Owner, for all equipment provided under this Section.

1.05 DELIVERY, STORAGE AND HANDLING
A. Packing, shipping, handling, and unloading:

1. Pack for shipping and outdoor storage at the project site for up to 6 months. a. Apply temporary corrosion protective coatings to unpainted components and pack components to protect from the elements.

2. Ship pump and drive completely assembled.
a. VFD shall be shipped unwired to the motor for field wiring.

PART 2 PRODUCTS

2.01 GENERAL
A. A single pump manufacturer shall furnish and coordinate all drives and pump components specified in this Section, including motors, gears, couplings, supports,

Page 1355 of 3040 ends

Liquid Chemical Diaphragm-Type Metering Pumps General
11242-4 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/11242 (CONFORMED) and other specified accessories and appurtenances to ensure compatibility and integrity of the individual components.

B. The manufacturer of the pumps shall have sole-source responsibility for furnishing the complete assemblies and meeting the specified performance requirements.

2.02 DESIGN AND PERFORMANCE CRITERIA
A. General: Provide mechanically actuated, positive displacement, diaphragm type chemical metering pumps, accessories, and other items required for a complete and operational system. Each chemical metering pump system shall include, but not be limited to, the following items, which shall be supplied by the chemical metering pump manufacturer.

1. Pumps.

2. Motors.

3. Variable frequency drive (VFD) (as applicable).

4. DC Drive (as applicable)

5. Control panels.

6. Calibration columns.

7. Pulsation dampeners.

8. External pressure relief valves.

9. Diaphragm back pressure valves.

B. Fluid characteristics:

1. Ferric chloride:
a. Dry chemical formula: 2FeCl3.
b. Solution concentration: 40 percent by weight.
c. Solution pH: < 2.
d. Solution specific gravity: 1.4.

C. Design requirements:

1. Pump:
a. Dry self-priming, capable of being run dry without damaging effects to pump.

2. Motor characteristics:
a. As specified in this Section and in Section 16222 - Low Voltage Motors up to 500 Horsepower.
b. Minimum acceptable motor size is 1/2 horsepower.

3. VFD characteristics: As specified in this Section.

4. Shafting and couplings: Design shafting and couplings to withstand a minimum of 1.5 times the maximum operating torque or other imposed loads.

5. Supports:
a. Provide pump and driver supported on a common base.
b. Design anchor bolts to withstand a minimum of 1.5 times the maximum imposed operating loads or 1.0 times the imposed seismic loads, whichever is greater.

Page 1356 of 3040 ends

Liquid Chemical Diaphragm-Type Metering Pumps General
11242-5 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/11242 (CONFORMED) D. Performance requirements:

1. Systems shall deliver the pressures and volumes listed for their respective services in the Pump Schedule.

E. Product requirements as specified in Section 01600 - Product Requirements and Section 15050 - Common Work Results for Mechanical Equipment.

2.03 PUMPS
A. Existing products:

1. Existing facility has ProMinent brand pumps.

2. New pumps must match style, material, finish, operation, and dimensions.

B. Equipment:

1. Pump:
a. Manufacturer, no equal:
1) Prominent Fluid Controls, Inc.

2. Type: Simplex chemical proportioning pumps of the positive displacement diaphragm type.

3. Materials:
a. The metering pumps and their components and accessories shall be suitable for the following chemical concentrations, as scheduled in this Section:
1) Ferric chloride:
a) Wetted parts shall be suitable for use with 23 to 43 percent ferric chloride solution.
b) Other non-specified materials are to be manufacturer’s standard for continuous service with 23 to 43 percent ferric chloride solution.
b. Diaphragm materials:
1) Flat, composite, mechanically actuated diaphragms shall be Viton™, EPDM or PTFE faced as pump manufacturer deems suitable for the pumped liquid, fiber reinforced and bonded to an elastomeric support with a Type 316 stainless steel backing plate.
2) Flat, composite, hydraulically actuated diaphragms shall be Viton™, EPDM or PTFE faced as pump manufacturer deems suitable for the pumped liquid.
3) Tubular, hydraulically actuated diaphragms shall be Viton™, EPDM or PTFE lined, as pump manufacturer deems suitable for the pumped liquid.
c. Other parts in contact with pumped liquid: PTFE, PVC, or other suitable thermoplastic.

4. Characteristics:
a. Diaphragm simplex chemical proportioning pumps of the positive displacement diaphragm type.
b. The diaphragm shall be mechanically actuated.
c. Liquid end:
1) Liquid end shall be sealed by means of an O-ring of material compatible with the pumped liquid.

Page 1357 of 3040 ends

Liquid Chemical Diaphragm-Type Metering Pumps General
11242-6 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/11242 (CONFORMED) 2) Pumps for sodium hypochlorite service shall be equipped with an off-gassing valve.
3) Liquid end of each metering pump shall be fitted with a system to detect early stage diaphragm failure. Upon actuation, the leak detector shall stop the pump, light a locally visible LED and sound a remote alarm.

5. Components:
a. Manually controlled external stroke controllers.
b. Suction and discharge single check valves.
c. Built-in internal or external, adjustable pressure relief valve to relieve pressure in the event of discharge line stoppage; which shall be factory set to relieve at 100 pounds per square inch gauge.
d. Hydraulic make-up and air bleed valves.

6. Accessories: As indicated on the Drawings, pumps shall be equipped with:
a. Calibration column in suction piping.
b. Diaphragm backpressure, pulsation dampener, and pressure relief valve in discharge piping.

7. Tests and inspections:
a. As scheduled in this Section.

8. Verification of performance.

2.04 MOTOR
A. Type:

1. Each chemical metering pump shall be motor-driven through a flexible coupling, or direct-connected to the pump when manufacturer’s standard.

2. Pumps and motors shall be mounted on floor-mountable base plates. a. Coupler:
1) Manufacturers: One of the following or equal:
a) Dodge, Para-flex.
b) Falk, Type WA.
c) Baldor.

B. Characteristics:

1. Electric motors shall be as specified in Section 16222 - Low Voltage Motors up to 500 Horsepower.

Page 1358 of 3040 ends

Liquid Chemical Diaphragm-Type Metering Pumps General
11242-7 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/11242 (CONFORMED)

2. Motors and motor starters shall be furnished by the pump manufacturer and shall be coordinated with the requirements of the pumps and the following characteristics:

Tag Number PMP-85183
Driver Type DC Drive
Drive Coupling Close-coupled, Verfical
Horsepower (Minimum) 1/2
Supply Voltage/Phase/Hertz 120/1/60
Speed (Maximum) 1,750 rpm
Service Factor 1.0
Ambient Temperature 40 degrees Centigrade
Maximum Temperature Rise 40 degrees Centigrade
Enclosure TENV
Insulation Class F
Bearings 6203
Fasteners

3. PMP-85183 (Coagulant Pump): The motor shall be a permanent magnet type, having a 90-volt direct current armature rating, and horsepower not less than the minimum specified rating. If the pump and motor are replaced to match the existing system, use Baldor Motor CDP3330 with Spec No. 33-2092Z122. This is a special-order motor with longer motor leads and should also be suitable for mounting an encoder on the NDE of the motor. Use Dart Controls DC Drive MD50P with encoder for monitoring speed feedback.

4. Motor shall have a thermostat for high temperature shutdown.

5. The motor brushes shall have tinned leads.

2.05 VENDOR CONTROL PANEL
A. General:

1. Replace existing DC drive only, all other existing components to remain in place.

B. DC drive with integrated controller:

1. Manufacturer: The following, no equal:
a. Dart Controls, MD50P with OPT420 module.

2. Display: 1/2 inch LED.

3. Ambient temperature: -10 – 45 degrees Celsius.

4. Line input frequency: 60 Hz.

5. Overload capacity: 200 percent for 1 minute.

Page 1359 of 3040 ends

Liquid Chemical Diaphragm-Type Metering Pumps General
11242-8 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/11242 (CONFORMED) C. Monitoring and control:

1. Dry contact rating: 120 VAC at 10 A.

2. Analog signal type: 4-20 mA.

3. Provide optional modules as needed for inputs and outputs listed below.

4. VCP Inputs:
a. Control:
1) Accept a pump speed set point (4-20 mA input).

5. VCP Outputs:
a. Status:
1) Running (dry contact).
2) ESTOP pressed (dry contact).

2.06 CONTROL STRATEGY
A. General.

B. Hardwired control functions:

1. Provide components required so that existing dilution water solenoid valve located in non-potable water line on the discharge side of the pump will be commanded to open when the pump is running and commanded to close when the pump is stopped.

2. With the HOA switch in HAND:
a. The pump may be started, stopped, and speed adjusted by the DC drive controller.

3. With the HOA switch in OFF:
a. The pump is stopped.

4. With the HOA switch in AUTO:
a. The pump receives a speed setpoint from the PCS via 4 – 20 mA input. If the speed is set to 0 percent (4mA), the pump shall stop.

2.07 SPARE PARTS
A. Vendor to provide spare parts that are required to provide uninterrupted operation for a minimum of 2 years.

B. Additional spare part requirements as specified in the Contract Documents.

2.08 ACCESSORIES
A. Pulsation dampeners:

1. Manufacturers: One of the following or equal:
a. Kemlon Products.
b. Blacoh Fluid Controls, Inc.
c. Pulsafeeder.

2. Pulsation dampeners shall be furnished and installed on each chemical metering pump’s discharge lines as indicated on the Drawings and scheduled in this Section.

Page 1360 of 3040 ends

Liquid Chemical Diaphragm-Type Metering Pumps General
11242-9 8660F10 July 12, 2023 - CONFORMED
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/11242 (CONFORMED)

3. Materials:
a. Pulsation dampeners shall have Hypalon diaphragms and CPVC, PVC, stainless steel, or lined cast iron chamber.
1) Materials shall be compatible with the pumped liquid at the specified concentration, and suitable for outdoor use and exposure.

4. Characteristics:
a. Pulsation dampeners shall be gas or air charged, single diaphragm type complete with valved gas/air charge valve connection and pressure gage graduated from 0 to 150 pounds per square inch.
b. Pulsation dampeners shall allow no more than 6 percent discharge pressure fluctuation.

5. Dampeners shall be provided with a true-union ball valve for shutoff.

B. Calibration columns:

1. Materials:
a. Materials shall be compatible with the pumped liquid and concentration specified in this Section, and suitable for outdoor use and exposure.

2. Characteristics:
a. Furnish and install calibration columns, 1 for each chemical metering pump, on each chemical pump’s inlet line as indicated on the Drawings and specified in this Section.
1) Columns shall be translucent.
b. Provide top cap threaded connection with vent piped to floor to prevent entry of foreign materials and to direct spillage or overflow. c. End connections shall be threaded.
d. Capacities and graduations shall be as indicated in the schedule in this Section.

C. Diaphragm backpressure and pressure relief valves:

1. As specified in Section 15118 - Pressure Reducing and Pressure Relief Valves.

2. Manufacturers: One of the following or equal:
a. Wallace and Tiernan.
b. Pulsafeeder.
c. Griffco.
d. Milton Roy Co.

3. Materials:
a. Valves shall be of suitable materials for the pumped liquid.

4. Characteristics:
a. Ported to serve as either a backpressure valve or a pressure relief valve. b. Relief valve shall be plumbed to the nearest chemical drain, or back to the pump suction on the non-pump side of the pump suction isolation valve, to avoid spillage, as indicated on the Drawings.
c. Valves shall be furnished and installed on each chemical metering pump’s discharge lines as indicated on the Drawings and scheduled in this Section.