Tree: Any wooden perennial plant having one or several structural bearing trunk stems commonly achieving nine feet or more in height.
A tree permit is required to perform any work on a street, heritage, or landmark tree, or to trench, grade, pave or park vehicles within the dripline of these trees. Other categories of trees, such as landscaping trees on private property, are not regulated. However, for this project, as specified in the Infrastructure Project IS/MND, the City tree administrator determined that, because of the significance of trees as a key element of the neighborhood’s identity, the requirement under the City’s Tree Preservation Ordinance to replace only heritage, native, and landmark trees and street trees would be expanded to include all trees that require removal.
The Infrastructure IS/MND specifies that trees will be evaluated on a case-by-case basis where construction activities are identified as affecting roots or branches. The City will make every reasonable effort to preserve trees where feasible; however, where tree removal cannot be avoided, replacement trees will be made available to homeowners through the City Parks and Recreation Department’s West Sacramento Tree Program.
MM BIO-3a Minimize Potential Impacts on Trees and MM BIO-3b Implement Mitigation for Removed Trees of the Infrastructure IS/MND minimize potential impacts on trees.
Methods
ESA’s International Society of Arboriculture (ISA) Certified Arborist, Jessica Orsolini (ISA No. WE-7845A; Tree Risk Assessment Qualified), with assistance from biologist Berlin Hernandez, collected field data on December 26th and 29th, 2023. The project design was revised in February 2024 so additional fieldwork was conducted on March 13th, 14th, and 18th, 2024. The trees surveyed for this arborist report include any tree in or overhanging the proposed work area with a minimum 2” diameter at breast height (DBH). The location of each tree was recorded using Geographic Positioning System (GPS) technology. Each tree surveyed was assigned a unique number, though no tagging was conducted. Tree tables are provided in Attachments B and C.
In December 2018, an arborist from West Coast Arborists, Inc. conducted a tree survey which included a portion of the project site. Where those trees overlapped the survey area, ESA updated the relevant information and assessed potential impacts. Numbering of the previously surveyed trees was left the same as the 2018 survey numbering for consistency, though an “E” representing “existing” was added to each number to identify them as the previously surveyed trees and to avoid numbering duplication with the newly surveyed trees. Data for previously surveyed trees is presented in Attachment B, while data for trees not previously surveyed is presented in Attachment C.
The DBH of publicly accessible trees was measured at approximately four and one-half feet above the ground; the DBH of private trees was estimated. The height and dripline of each tree was estimated. Tree condition was judged with respect to structure, vigor, defects, conformance to generally accepted arboricultural standards of care, disease, and danger of falling. Each tree was assigned to one of six categories for tree condition. The six categories were good (G; no defects or minor defects), fair to good (F-G; defects), fair (F; more serious defects), fair to poor (F-P; severe or compounding defects), and poor (P; severe or compounding defects, and short-term death or structural failure of the tree is expected). Condition was judged based on an external inspection of each tree from the ground.
199
Ms. Martinez
April 5, 2024
In addition to collection of the basic tree data and the condition assessment, the distance from the edge of each tree trunk to the edge of the proposed work area was recorded to assess the potential for root impacts. Notes were made regarding the potential for tree trimming or removal based on the distance of the tree to the work area and the height of overhanging branches.
Results
Tree locations are shown on the figure in Attachment A and tree data is presented in Attachments B and C. A total of 355 trees were surveyed and assessed for potential construction impacts. This includes 306 newly surveyed trees and updates to 49 trees previously mapped by West Coast Arborists, Inc. (ten trees previously mapped by West Coast Arborists, Inc. in the survey area have been removed, no longer exist, or were recorded as the wrong species and are not counted in the tree total). Due to the project design change in February 2024, 51 trees mapped during the December surveys no longer occur adjacent to proposed work. These trees are still shown on the figure in Attachment A and in the tree tables in Attachments B and C but are shown on the figure with no impacts and noted in the table that the project was redesigned and therefore won’t be impacted.
Of the 355 trees surveyed, 99 are considered heritage trees under the West Sacramento tree ordinance due to their size. A total of 18 trees surveyed were in good condition, 105 were in fair-good condition, 173 were in fair condition, 42 were in fair-poor condition, and 17 were in poor condition. Data collected for each tree is shown in the tables in Attachments B and C.
The assessment of canopy pruning was based on tree condition at the time of the survey. Due to the winter timing of the survey, most of the deciduous trees were without leaves. Additionally, spring growth is expected between the survey and project initiation. Consequently, the assessment of canopy pruning is an estimate and may vary at the time of construction. Based on the height and length of branches overhanging the work areas at the time of the survey, 22 trees are likely to need canopy pruning to provide equipment access and an additional 94 may need pruning depending on the height of the equipment, amount of spring branch growth, and how much the branches are weighed down after they leaf out. Two-hundred and thirty-nine (239) trees had sufficient clearance at the time of the survey that canopy pruning is not anticipated, or they are now located outside the proposed project work area.
Tree roots are typically shallow, spread wide, and horizontally oriented. The portion of the root zone that is essential for tree health and stability is called the critical root zone. The critical root zone varies depending on the species, age, and site conditions around the tree, though a common rule of thumb is to use the dripline to estimate the outer edge of the critical root zone (PNISA, 2022). For the purposes of the analysis in this report, the critical root zone was considered at the edge of the estimated dripline. All but five trees surveyed adjacent to proposed work will likely have some work occurring within the critical root zone. Of the trees with critical root zones occurring outside the work area, three are small, recently planted gingko trees and two are small recently planted crape myrtle trees that have a critical root zone that likely occurs at the very edge of the work area.
Within the critical root zone are the structural roots that help anchor the tree. Structural roots may be estimated at a distance approximately equal to the circumference at breast height measured horizontally from the trunk (Costello and Jones 2003). To determine the area of predicted structural roots around each tree, the circumference of each tree was first calculated based on the DBH measurement. For trees with multiple trunks, the DBH was calculated by taking the square root of the sum of all squared trunk stem DBHs to reach a single DBH that more 200
Ms. Martinez
April 5, 2024
accurately represents the basal area and thus the estimated structural root area. Using circumference of each surveyed tree, the structural root zone of each tree was calculated and compared to the distance to the proposed work. The structural root zone of each tree was determined to either be outside, inside, or at the edge (within 6 inches) of the proposed work areas. Due to the variability of root systems and variability of construction impacts, trees identified at the edge may or may not have structural roots in the work zone.
The structural root zone of a total of 115 trees occurs within the proposed work area, and a total of 50 trees have a structural root zone that approaches the edge of the proposed work area. The structural root zone of the remaining 190 trees occurs outside the proposed work area. Trees with structural root zones in the proposed work area are labeled on the figure in Attachment A.
The condition of each tree with a structural root zone in or at the edge of the proposed work area was reviewed to further assess potential construction impacts. Trees in fair-poor or poor condition may have a lower likelihood of survival or recovery if structural roots are cut. There are 28 trees in fair-poor condition and nine trees in poor condition with structural root zones occurring in the work area; one additional tree in poor condition and three additional trees in fair-poor condition have structural root zones occurring at the edge of the work area. Of these, 21 are heritage trees (see the tree tables in Attachments B and C).
During the survey, the roots of 26 trees were noted to be lifting or cracking the curb, road, or sidewalk or growing over the curb adjacent to the proposed curb improvement. These trees are: tree 1E – a coast redwood; tree 5E – an English walnut; trees 6E, 53E, and 126 – white mulberries; tree 10E – a Monterey cypress; trees 11E and 263 – silver maples; tree 13E – a deodar cedar; trees 14E, 19E, 25E, 31E, 32E, 33E, 40E, 108, and 160 – London planes; tree 23E a valley oak; tree 26E – a Modesto ash; tree 36E – a silver dollar gum; tree 97 – a Chinese tallow; tree 182 – an ash, tree 197 – a saucer magnolia, and tree 284 – a gingko. The roots of tree 42E, a London plane tree, are growing over the curb.
In addition to trees observed damaging the curb, gutter, road, and sidewalks, another 15 trees were also noted to have roots visible at the curb adjacent to the proposed work area. These trees consist of: tree 8E – a littleleaf linden, tree 20E – a Siberian elm, trees 28E, 211, 212 – a London plane, tree 37E – an American sweetgum, tree 117 – a valley oak, tree 183 – an ash, tree 188 – a silver maple, tree 207 – an eastern redbud, tree 208 – an English walnut, tree 209 – an edible fig, tree 250 – a flowering plum, tree 258 – a Canary Island date palm, and tree 285 – a gingko.
Discussion
Tree roots provide multiple functions, including anchoring the tree and supplying the crown with water and mineral nutrients. Protection of tree roots is one of the most critical aspects of tree preservation during construction. Most tree roots grow within 3 feet of the soil surface and most fine roots (short-lived roots that absorb water and mineral nutrients) are within the top 12 to 18 inches of the soil surface. While the critical root zone is often considered to extend to the edge of a tree’s dripline, tree roots can extend far beyond the dripline and occupy two to ten times the area beneath the canopy. Root growth is highly opportunistic, creating asymmetric forms. They proliferate in areas favorable for their growth, where water, nutrients, and oxygen are abundant (Matheny and Clark, 1998). Tree stability depends on both the root system architecture and the anchorage of roots in the soil. The larger the root plate, the greater the force needed to tip a tree. Uneven 201
Ms. Martinez
April 5, 2024
distribution of roots and large sections without roots reduces anchorage. Similarly, development of lateral roots increase anchorage of trees subject to wind loading (Watson et al., 2014).
Most of the trees surveyed were likely planted after construction of the sidewalks and roads. Roads, sidewalks, and other surfaces often restrict root extension due to compacted soils. Some studies indicate that roots generally don’t extend very far under intact pavement, and sometimes taper off in as little as 4 inches (Day and Wiseman, 2009). While soil under pavement can be difficult for root growth, there are exceptions. For example, some trees can elongate roots through compacted soil when it is softened by moisture and coarse textured soils are less compactable than fine textured clays so roots may penetrate more deeply in these soil types (Day and Wiseman, 2009). Roots often grow in the gap between the pavement and the compacted soil under it. The likelihood of roots in these areas increases with the size, age, and growth rate of the tree, and distance between the tree and area of pavement. Large trees in restricted planting spaces are most commonly associated with pavement damage (Watson et al., 2014).
Work will occur within the critical root zone of nearly all the trees adjacent to the proposed work and within the structural root zone of 115 to 165 trees. Due to the variability of root growth and the anticipated reduction of root growth under the road and sidewalk, it is difficult to predict with certainty the number of roots that may be lost due to construction. Trees that are currently visibly impacting the curb, gutter, and road, or with visible roots adjacent to the work area (listed above) have an increased likelihood of root impact/loss due to excavation required for construction. The amount of root removal a tree can tolerate is dependent on the species and health of the tree. It is commonly thought that a healthy, vigorous tree can tolerate removal of approximately one-third of its roots, and potentially up to 50 percent, although there may be stability problems if all the roots on one side are severed. Old trees and those of low vigor are less tolerant of root impacts. Due to the variability of rooting patterns, it is also difficult to know at what point 30 to 50 percent of the roots have been impacted (Matheny and Clark, 1998).
While canopy pruning for clearance may be needed on up to half of the trees, nearly all branches that may need pruning were small in diameter. The overall foliage and branch removal anticipated to be needed is insubstantial compared with the entire canopies. Impact from canopy pruning is expected to be low.
Recommendations
Roots greater than 4 inches in diameter are usually structural roots. Removal of structural roots may greatly reduce the anchorage of the tree and increase the probability of the tree falling over. Work within the structural root zone should be avoided to the maximum extent possible. Where avoidance is not possible, damage to tree roots should be minimized.
Excavation of soil in the root zone at the limit of construction activities will help determine the extent of root impacts. In many cases roots may grow up to, and parallel immediately behind the existing gutter. The least impactful replacement method may be to 1) remove the existing curb/gutter, 2) expose adjacent roots using hand tools, and 3) build the forms for the new curb/gutter only up to the existing roots (i.e., the back of the existing gutter) without severing any roots. Accomplishing this may require flexibility in construction methods and design.
The following 39 trees are heritage trees in fair or better condition that will have work occurring in the structural root zone: tree numbers 78, 102, and 117 (valley oaks); 1E (coast redwood); 2E, 3E, 7E, 14E, 19E, 21E, 22E, 202
Ms. Martinez
April 5, 2024
24E, 25E, 33E, 34E, 35E, 38E, 39E, 40E, 42E, 47E, 104, 107, 108, 121, and 122 (London plane trees); 126 (white mulberry); 132, 218, and 265 (silver maples); 197 (saucer magnolia); 256 and 258 (Canary Island date palm); 8E (littleleaf linden); 10E (Monterey cypress); 12E and 13E (deodar cedars); 36E (a silver dollar gum); and 37E (American sweetgum). Consideration for construction redesign to avoid impacts in the critical root zone should be given to further preserve these heritage trees currently in fair or better condition.
The following recommendations will help protect trees during construction. These recommendations should be added to the design drawings or bid specifications to ensure implementation and protection of trees during construction.
• The canopy of retained trees that overhang the work area should be pruned to the minimum height required for construction. Pruning should be conducted by an ISA certified tree worker or arborist in accordance with American National Standard Institute (ANSI) A300 Pruning Standard or adhere to the most recent edition of ANSI Z133.1.
• Areas within the critical root zone of retained trees which will not be directly impacted by construction should be avoided. No driving, parking, or storage of equipment or materials should occur within avoided areas of the critical root zone. Entry of construction personnel into the avoidance area should not be allowed except for activities undertaken for the protection of the tree. • Roots should be uncovered using hand tools, air spades, or water spades. After the roots are uncovered, root pruning should be conducted along the limit of work. Roots should be pruned to the same depth, and no more, as adjacent excavation. Roots should be pruned by a method that cuts them cleanly such as a rock saw, vibrating knife, narrow trencher with sharp blades, or hand excavation and sawing. Roots should not be severed with backhoes, excavators, bulldozers, graders, or other rough grading equipment that may pull or shatter tree roots. Where possible, roots may be shaved flat rather than cut. This can be done using a chainsaw or debarking tool.
• Exposed roots should be kept moist to minimize water loss, and the soil should be replaced as quickly as possible. The purpose of root pruning is to remove only those roots that need to be removed to complete construction, without further damaging the root system. • If during project implementation, a root greater than 4 inches diameter is encountered that needs to be cut, the tree should be further evaluated by a certified arborist to determine if the tree should be removed all together to eliminate a falling hazard.
203
Ms. Martinez
April 5, 2024
We appreciate the opportunity of providing arborist services for the State Streets Pavement Rehabilitation Project.
Please reach out with any questions.
Sincerely,
Jessica Orsolini
Certified Arborist WE-7845A/ Senior Biologist
Attachment A. Tree Location Figure
Attachment B. Tree Data for Previously Surveyed Trees
Attachment C. Tree Data for Newly Mapped Trees
References
Costello, L. R. and K. S. Jones. 2003. Reducing Infrastructure Damage by Tree Roots: A Compendium of Strategies. Western Chapter of the International Society of Arboriculture, Porterville, CA.
Day, S. D., and E. P. Wiseman. 2009. At the Root of It. Arborist News. Available: www.isa-arbor.com Matheny, N. and J. R. Clark. 1998. Trees and Development: A Technical Guide to Preservation of Trees During Land Development. International Society of Arboriculture, Champaign, IL.
Pacific Northwest International Society of Arboriculture (PNISA). 2022. Protecting Trees from Damage. PNISA, Tigard, OR. Available: https://pnwisa.org/page/protecting-trees-from-damage Watson, G.W., A. M. Hewitt, M. Custic, and M. Lo. 2014. The Management of Tree Root Systems in Urban and Suburban Settings II: A Review of Strategies to Mitigate Human Impacts. Arboriculture and Urban Forestry 40(5): 249-271.
204
Attachment A
Tree Location Figure
205
Park Blvd Deer
w
ood
St
Stone Blvd
19th St
Park Blvd
19th St
Delaware Ave
Maryland Ave
Stone Blvd
Pennsylvania Ave
19th St
Delaware Ave
Stone Blvd
49E
53E
81 80
82 83
84 96
97 98
99 100 101
Path: U:\GIS\GIS\Projects\2023xxx\D202300227_00_State_Streets_Pavement\03_Project\State_Streets\State_Streets.aprx AttachmentB_MapSeries, EPimentel 4/5/2024 SOURCE: Esri, 2022; Bennett Engineering Services, 2024; ESA, 2024: State Streets Pavement Rehabilitation Project Attachment A. Tree Location Figure
N
0 100
Feet
Project Design Area
Tree Removed*
* 'E' denotes previously surveyed trees
Construction Work Planned in Structural
Root Zone (Heritage Trees)*
Yes
Edge
No
Construction Work Planned in Structural
Root Zone (Non-Heritage Trees)*
Yes
Edge
No
206
W Sacramento
Memorial Park
19th St
Euclid St
Alabama Ave
Stone Blvd
19th St
Vermont Ave
Carolina
Ave
18th St
Virginia Ave
Stone Blvd
SNRR
19th St
Carolina Ave
Jefferson
Blvd
Jefferson
Blvd
SNRR
1E
7E
8E
9E
10E
3E
2E
6E
5E
4E
65 66
67 68
69 76
77 78 79
297
298 299
301
303
304
263
264
265
266
267 268
269
270
271
272
273
274
275
276
277
278
279
280
288
289
290
291
292
293
294
295
296
300
302
305
306
Path: U:\GIS\GIS\Projects\2023xxx\D202300227_00_State_Streets_Pavement\03_Project\State_Streets\State_Streets.aprx AttachmentB_MapSeries, EPimentel 4/5/2024 SOURCE: Esri, 2022; Bennett Engineering Services, 2024; ESA, 2024: State Streets Pavement Rehabilitation Project Attachment A. Tree Location Figure
N
0 100
Feet
Project Design Area
Tree Removed*
* 'E' denotes previously surveyed trees
Construction Work Planned in Structural
Root Zone (Heritage Trees)*
Yes
Edge
No
Construction Work Planned in Structural
Root Zone (Non-Heritage Trees)*
Yes
Edge
No
207
Acorn Ct
19 Park Blvd
th St
Maryland Ave
18th St
17th St
17th St
Delaware
Ave
Maryland Ave
18th St
Regent St
W Sacramento
Memorial Park
17th
S
t
54E
78E
85 86
87 88
89 90
91 94
95 Path: U:\GIS\GIS\Projects\2023xxx\D202300227_00_State_Streets_Pavement\03_Project\State_Streets\State_Streets.aprx AttachmentB_MapSeries, EPimentel 4/5/2024 SOURCE: Esri, 2022; Bennett Engineering Services, 2024; ESA, 2024: State Streets Pavement Rehabilitation Project Attachment A. Tree Location Figure
N
0 100
Feet
Project Design Area
Tree Removed*
* 'E' denotes previously surveyed trees
Construction Work Planned in Structural
Root Zone (Heritage Trees)*
Yes
Edge
No
Construction Work Planned in Structural
Root Zone (Non-Heritage Trees)*
Yes
Edge
No
208
Alabama
Ave
Virginia Ave
Alabama
Ave
1 7th S
t
17th St
84 SNRR
84 84
Virginia Ave
Vermont Ave
Vermont Ave
17th St
16th St
Jefferson
Blvd
SNRR
66E
77E
18E
23E
24E
25E
26E
11E
12E
13E
14E
15E
19E
20E
21E
22E
60 61
62 63
64 70
71 72 73 74
75 175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205 206
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251 252
253
254
255
256
257
258
259
260
261
262
281
282
283
284
285
286
287
Path: U:\GIS\GIS\Projects\2023xxx\D202300227_00_State_Streets_Pavement\03_Project\State_Streets\State_Streets.aprx AttachmentB_MapSeries, EPimentel 4/5/2024 SOURCE: Esri, 2022; Bennett Engineering Services, 2024; ESA, 2024: State Streets Pavement Rehabilitation Project Attachment A. Tree Location Figure
N
0 100
Feet
Project Design Area
Tree Removed*
* 'E' denotes previously surveyed trees
Construction Work Planned in Structural
Root Zone (Heritage Trees)*
Yes
Edge
No
Construction Work Planned in Structural
Root Zone (Non-Heritage Trees)*
Yes
Edge
No
209
Maryland Ave
Alabama Ave
Pennsylvania Ave Delaware Ave
16th St
Alabam
a
Ave
Pennsylvan
ia Ave
Circle St
Circle Park
Virginia
Ave
Alabama Ave
Alameda Blvd
Circle St
SNRR
Jefferson
Blvd
70E
72E
73E
36E
46E
42E
43E
44E
47E
71E
38E
37E
39E
33E
34E
35E
27E
28E
29E
30E
31E
32E
40E
41E
45E
5 6
7 8
10 11
12 13
14 15
16 17
18 19
20 21
22 23
24 25
26 27
28 29
30 31
32 33
34 35
36 37
38 39
40 41
42 50 43
51 52
53 54
55 56
57 58
59 92
93 104
105
106
107
112
113
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
133 132
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
207
208
209
210
211
212
213
Path: U:\GIS\GIS\Projects\2023xxx\D202300227_00_State_Streets_Pavement\03_Project\State_Streets\State_Streets.aprx AttachmentB_MapSeries, EPimentel 4/5/2024 SOURCE: Esri, 2022; Bennett Engineering Services, 2024; ESA, 2024: State Streets Pavement Rehabilitation Project Attachment A. Tree Location Figure
N
0 100
Feet
Project Design Area
Tree Removed*
* 'E' denotes previously surveyed trees
Construction Work Planned in Structural
Root Zone (Heritage Trees)*
Yes
Edge
No
Construction Work Planned in Structural
Root Zone (Non-Heritage Trees)*
Yes
Edge
No
210
Park Blvd
15th St
De
lawa
r
e Ave
Alabama
Ave
13th St
Delaware Ave
15th St
Alabam
a
Ave
Alabam
a Ave
Pennsy
l
v
a
n
i
a
A
v
e
13th St
Circle Park
V
i
rg
i
n
i
a Ave
13th St
15th St
Virg
i
n
ia
Av
e
Jefferson
Blvd
74E
75E
76E
48E
1 2
3 4
9 44
45 46
47 48
49 102
103
104
108
109
110
111
113
114 115
116
Path: U:\GIS\GIS\Projects\2023xxx\D202300227_00_State_Streets_Pavement\03_Project\State_Streets\State_Streets.aprx AttachmentB_MapSeries, EPimentel 4/5/2024 SOURCE: Esri, 2022; Bennett Engineering Services, 2024; ESA, 2024: State Streets Pavement Rehabilitation Project Attachment A. Tree Location Figure
N
0 100
Feet
Project Design Area
Tree Removed*
* 'E' denotes previously surveyed trees
Construction Work Planned in Structural
Root Zone (Heritage Trees)*
Yes
Edge
No
Construction Work Planned in Structural
Root Zone (Non-Heritage Trees)*
Yes
Edge
No
211
Attachment B
Tree Data for Previously
Surveyed Trees
212
Arborist Report for the State Streets Pavement Rehabilitation Project B-1 ESA / D202300227.00 City of West Sacramento, California April 2024
ATTACHMENT B
TREE DATA FOR PREVIOUSLY SURVEYED TREES
Tree
Number Common Name Scientific Name
Diameter at
Breast Height
(DBH) (inches)
Height (feet) Dripline (feet) Tree Pruning
Required
Structural
Root Zone
(feet)
Estimated
Distance to
Edge of Work
Area (feet)
Construction
Work Planned
in Structural
Root Zone
Heritage Tree Condition Notes
1E Coast redwood Sequoia sempervirens 40 60 25 No 10.47 0 Y Yes Good-Fair Adjacent to work area but has high clearance. Lifting sidewalk.
2E London plane Platanus x hispanica 42 80 35 No 11.0 2.75 Y Y Fair Has high canopy clearance, no pruning expected. 3E London plane Platanus x hispanica 27.5 60 30 No 7.2 3 Y Y Fair Has high canopy clearance, no pruning expected. 4E Box elder Acer negundo Removed Removed Removed Removed Removed Removed Removed Removed Removed Tree no longer exists - removed. 5E English walnut Juglans regia 16.5 25 20 No 4.3 3.25 Y N Fair-Poor Has high canopy clearance, no pruning expected. Slight
lifting of gutter adjacent to tree possibly from roots not visible.
6E White mulberry Morus alba 41.5 50 20 Maybe 10.9 1.75 Y Y Fair-Poor Generally has high clearance, small overhanging branches may require minor pruning. Large roots visible 1 ft from curb. Root’s likely responsible for cracking and lifting of curb and gutter.
7E London plane Platanus x hispanica 43.5 90 35 No 11.4 1.5 Y Y Fair Has high canopy clearance, no pruning expected. 8E Littleleaf linden Tilia cordata 29 70 35 No 7.6 3.5 Y Y Fair Has high canopy clearance, no pruning expected. Medium roots parallel to curb.
9E Littleleaf linden Tilia cordata Removed Removed Removed Removed Removed Removed Removed Removed Removed This tree is a maple 10E Monterey cypress Hesperocyparis
macrocarpa
67 90 30 Maybe 17.5 0 Y Y Fair Generally has high clearance, may require pruning of small branches. Roots pushing out and lifting curb.
11E Silver maple Acer saccharinum 35 70 45 Maybe 9.2 2 Y Y Poor Generally has high clearance, small overhanging branches may require pruning. Crack in road likely from root.
12E Deodar cedar Cedrus deodara 37.5 100 35 Yes 9.8 2 Y Y Fair Small low hanging branches will likely require pruning. 13E Deodar cedar Cedrus deodara 43.5 100 40 No 11.4 2 Y Y Fair Has high canopy clearance, no pruning expected. Slight lifting of curb adjacent to tree possibly from roots not visible. 14E London plane Platanus x hispanica 46 70 35 No 12.0 1 Y Y Fair Has high canopy clearance, no pruning expected. Broken curb adjacent to large root, likely caused by root damage. 15E London plane Platanus x hispanica 26.5 55 25 No 6.9 2 Y Y Fair-Poor Has high canopy clearance, no pruning expected. 18E London plane Platanus x hispanica Removed Removed Removed Removed Removed Removed Removed Removed Removed Tree has been removed. 19E London plane Platanus x hispanica 46.5 90 35 No 12.2 1 Y Y Fair Has high clearance, pruning not likely required. Curb is bowed out at root.
20E Siberian elm Ulmus pumila 35 50 20 Maybe 9.2 1.5 Y Y Poor General has high clearance, may require minor pruning of small branches. Large roots at curb.
21E London plane Platanus x hispanica 54 90 55 No 14.1 0.75 Y Y Fair Has high clearance, pruning not likely required. Curb has been realigned to accommodate roots.
22E London plane Platanus x hispanica 20.5 45 25 Maybe 5.4 3 Y Y Fair Small overhanging branches may require pruning for equipment access. Roots perpendicular to curb..
23E Valley oak Quercus lobata 32 50 25 No 8.4 2 Y Y Fair-Poor Has high canopy clearance, no pruning expected. Large
roots at curb, root visible in gutter. Curb replaced by concrete.
24E London plane Platanus x hispanica 38.5 85 35 No 10.1 3 Y Y Fair Canopy has high clearance, unlikely to require pruning. 25E London plane Platanus x hispanica 29.5 55 30 Maybe 7.7 2 Y Y Fair Small overhanging branches may require pruning. Root cracking curb.
26E Modesto ash Fraxinus velutina 'Modesto' 30 45 15 No 7.9 2 Y Y Poor Canopy has high clearance, unlikely to require pruning.
Possible lifting and cracking in gutter from root.
27E London plane Platanus x hispanica 26 60 20 No 6.8 2.5 Y Y Fair-Poor Has high canopy clearance, no pruning expected. 28E London plane Platanus x hispanica 42.5 80 35 No 11.1 2 Y Y Fair-Poor Has high canopy clearance, no pruning expected. Large roots at curb previously cut.
29E London plane Platanus x hispanica 36.5 85 30 No 9.6 2.75 Y Y Fair-Poor Tree has high clearance. Pruning not required. 30E London plane Platanus x hispanica 37 80 40 No 9.7 2.25 Y Y Fair-Poor Tree has high clearance. Pruning not required. 213
Arborist Report for the State Streets Pavement Rehabilitation Project B-2 ESA / D202300227.00 City of West Sacramento, California April 2024
Tree
Number Common Name Scientific Name
Diameter at
Breast Height
(DBH) (inches)
Height (feet) Dripline (feet) Tree Pruning
Required
Structural
Root Zone
(feet)
Estimated
Distance to
Edge of Work
Area (feet)
Construction
Work Planned
in Structural
Root Zone
Heritage Tree Condition Notes
31E London plane Platanus x hispanica 43 90 30 No 11.3 2 Y Y Fair-Poor Generally has high clearance. Unlikely to require canopy pruning. Curb bulging adjacent to tree likely from roots. 32E London plane Platanus x hispanica 45.5 85 35 Yes 11.9 1.25 Y Y Poor Small overhanging branches may require minor pruning.
Roots against curb, some minor uplift of curb.
33E London plane Platanus x hispanica 37 50 40 No 9.7 2.5 Y Y Good Generally has high clearance. Unlikely to require pruning.
Pavement lifting adjacent to tree - likely from roots
34E London plane Platanus x hispanica 36 50 40 No 9.4 2.5 Y Y Fair Generally has high clearance. Unlikely to require pruning. 35E London plane Platanus x hispanica 22.5, 24.5 50 30 Maybe 8.7 1.75 Y Y Fair Small overhanging branches may require minor pruning. 36E Silver dollar gum Eucalyptus polyanthemos 40 55 40 Maybe 10.47 0 Y Yes Fair Adjacent to work area but has high clearance. Lifting sidewalk.
37E American sweetgum Liquidambar styraciflua 44 80 20 No 11.5 3.5 Y Y Fair Generally has high clearance. Unlikely to require pruning. A portion of the curb adjacent to the tree is gone and roots exposed parallel to curb.
38E London plane Platanus x hispanica 50.5 95 40 Maybe 13.2 1.5 Y Y Fair Small overhanging branches may require minor pruning. 39E London plane Platanus x hispanica 34 60 35 No 8.9 4 Y Y Fair Generally has high clearance. Unlikely to require pruning. 40E London plane Platanus x hispanica 35 90 40 No 9.2 0 Y Y Fair Generally has high clearance. Unlikely to require canopy pruning. Root flare past curb line - curb is no longer present.
Gutter lifting from roots.
41E Silver maple Acer saccharinum Removed Removed Removed Removed Removed Removed Removed Removed Removed Tree has been removed. 42E London plane tree Platanus x hispanica 33.5 60 35 No 8.77 0 Y Yes Fair Significantly overhangs road but has high clearance. Old pruning cuts in canopy. Roots growing over curb.
43E American sweetgum LIquidambar styraciflua 25.5 50 25 Maybe 6.68 2 Y Yes Fair-Poor Minimal overhang over road. Possible minor branch pruning.
Previously topped. Heavy sprouting.
44E Bradford pear Pyrus calleryana 19 25 15 No 4.97 2 Y No Fair-Poor Overhangs road, but no low hanging branches. Many codominant stems. 45E Silver maple Acer saccharinum Removed Removed Removed Removed Removed Removed Removed Removed Removed Tree has been removed. 46E London plane tree Platanus x hispanica Removed Removed Removed Removed Removed Removed Removed Removed Removed Tree has been removed. 47E London plane tree Platanus x hispanica 45.5 80 40 No 11.91 1 Y Yes Fair Overhangs road but canopy clearance is high. Very little growing space in planting strip.
48E London plane Platanus x hispanica Removed Removed Removed Removed Removed Removed Removed Removed Removed Tree has been removed. 49E American sweetgum LIquidambar styraciflua 28 45 25 No 7.33 8 N Yes Fair Adjacent to work area but has high clearance. 53E White mulberry Morus alba 35 40 25 Maybe 9.16 3 Y Yes Poor Small overhanging branches may require pruning. Roots lifting and cracking sidewalk.
54E Coast redwood Sequoia sempervirens 60 70 20 No 15.71 N/A N Yes Good Roots are lifting sidewalk and adjacent road. Roots appear to have been previously pruned. Project redesigned and no longer impacts this tree.
66E London plane tree Platanus x hispanica 35 60 50 No 9.16 12 N Yes Fair Partially overhangs work area but has high clearance. 70E American sweetgum LIquidambar styraciflua 35 20 20 No 9.16 N/A N Yes Fair-Poor Roots lifting and cracking sidewalk. Project redesigned and no longer impacts this tree.
71E Valley oak Quercus lobata 45 55 52 No 11.78 N/A N Yes Fair Has high clearance. Project redesigned and no longer impacts this tree.
72E Southern magnolia Magnolia grandiflora 36 45 30 No 9.42 N/A N Yes Fair High clearance over sidewalk. Project redesigned and no longer impacts this tree.
73E Tulip tree Liriodendron tulipifera 20.5 45 20 No 5.37 N/A N No Fair Most clearance is high. Tree is rooted on uphill slope.
Project redesigned and no longer impacts this tree.
74E Valley oak Quercus lobata Removed Removed Removed Removed Removed Removed Removed Removed Removed Tree no longer exists. 75E White mulberry Morus alba 40 45 30 No 10.47 N/A N Yes Poor Has high clearance. Limited growing space in planting strip.
Project redesigned and no longer impacts this tree.
76E White mulberry Morus alba 26 35 20 No 6.81 N/A N Yes Poor High clearance. Limited space in planting strip. Project redesigned and no longer impacts this tree.
77E White mulberry Morus alba Removed Removed Removed Removed Removed Removed Removed Removed Removed No white mulberry present. Saucer magnolia at this location. 214
Arborist Report for the State Streets Pavement Rehabilitation Project B-3 ESA / D202300227.00 City of West Sacramento, California April 2024
Tree
Number Common Name Scientific Name
Diameter at
Breast Height
(DBH) (inches)
Height (feet) Dripline (feet) Tree Pruning
Required
Structural
Root Zone
(feet)
Estimated
Distance to
Edge of Work
Area (feet)
Construction
Work Planned
in Structural
Root Zone
Heritage Tree Condition Notes
78E Modesto Ash Fraxinus velutina 'Modesto' Removed Removed Removed Removed Removed Removed Removed Removed Removed No ash here. Incense cedar. 215
Attachment C
Tree Data for Newly Mapped
Trees
216
Arborist Report for the State Streets Pavement Rehabilitation Project C-1 ESA / D202300227.00 City of West Sacramento, California April 2024
ATTACHMENT C
TREE DATA FOR NEWLY MAPPED TREES
Tree
Number Common Name Scientific Name
Diameter at
Breast Height
(DBH) (inches)
Height (feet) Dripline (feet) Tree Pruning
Required
Structural
Root Zone
(feet)
Estimated
Distance to
Edge of Work
Area (feet)
Construction
Work Planned
in Structural
Root Zone
Heritage Tree Condition Notes
1 Sawleaf zelkova Zelkova serrata 35 50 20 No 9 N/A N Y Fair-Poor Overhanging road by 10 ft. Previously pruned for power
lines. Project redesigned and no longer impacts this
tree.
2 Gingko Gingko biloba 1 10 3 No 0.3 3 N N Good Recently planted sapling away from curb. 3 Gingko Gingko biloba 1.5 7 3 No 0.4 3 N N Good Recently planted sapling away from curb. 4 Gingko Gingko biloba 3, 2.5 15 3 No 1.0 3 N N Fair Small tree. Co-dominant trunks. Branches rubbing and causing damage.
5 Bradford pear Pyrus calleryana 15.5, 17 30 20 Maybe 6.0 3.5 Y Y Fair-Poor No major overhanging branches. Possible minor pruning needed. Rot in trunk. Prior co-dominant trunk failure.
6 Bradford pear Pyrus calleryana 20 30 25 Maybe 5.2 4 Y N Fair-Poor No major overhanging branches. Possible minor pruning needed. Rot in trunk. Prior co-dominant trunk failure.
7 Bradford pear Pyrus calleryana 20.5 30 20 Maybe 5.4 4 Y N Poor No major overhanging branches. Possible minor pruning needed. Rot in trunk. Prior co-dominant trunk failure.
8 Bradford pear Pyrus calleryana 20 30 20 No 5.2 2 Y N Fair-Poor Little overhang over road. Major rot in trunk, mistletoe. 9 Eastern redbud Cercis canadensis 7 17 12 No 1.8 6 N N Fair Pruning unlikely due to limited overhang. 10 Mexican fan palm Washingtonia robusta 22.5, 21.5 50 10 No 8.1 N/A N Y Good-Fair At edge of sidewalk but away from corner
improvements. About 5ft from the curb. Project
redesigned and no longer impacts this tree
11 Coast redwood Sequoia sempervirens 16 12 Maybe 4.2 3 Y N Good Work area mostly outside drip line. 12 Chinese pistache Pistacia chinensis 7 30 12 Yes 1.8 2.5 N N Good-Fair Small branch overhangs curb. 13 Chinese pistache Pistacia chinensis 12 45 20 Maybe 3.1 2 Y N Fair Small branches overhang curb. Clearance generally high.
14 Chinese pistache Pistacia chinensis 8.5 30 17 Maybe 2.2 2 E N Fair Small branches overhang curb. Clearance generally high.
15 Chinese pistache Pistacia chinensis 8.5 30 25 Maybe 2.2 2 E N Fair Small branches overhang curb. Clearance generally high.
16 Chinese pistache Pistacia chinensis 8 30 17 Maybe 2.1 2 E N Fair Small branches overhang curb. Clearance generally high.
17 Sawleaf zelkova Zelkova serrata 9.5 35 25 Maybe 2.5 1.75 Y N Fair Few small branches overhanging work area, but clearance is generally high. Many co-dominant stems.
18 Sawleaf zelkova Zelkova serrata 10 35 25 Maybe 2.6 1.75 Y N Fair Few small branches overhanging work area, but clearance is generally high. Many co-dominant stems.
19 Sawleaf zelkova Zelkova serrata 9.5 30 20 No 2.5 1.5 Y N Fair Overhangs work area, but clearance is high. Codominant stems. 20 Sawleaf zelkova Zelkova serrata 11.5 30 20 No 3.0 1.75 Y N Good-Fair Overhangs work area, but clearance is high. Codominant stems. 21 Sequoia Sequoiadendron
giganteum 16 35 10 Yes 4.2 2 Y N Fair Overhangs work area. 22 Eastern redbud Cercis canadensis 2, 1.5, 1 6 4 No 0.8 3 N N Fair Small tree away from curb. Rot in trunk. 23 Chinese pistache Pistacia chinensis 11 50 20 No 2.9 3 E N Fair Overhangs road but high clearance. Heavy sprouting in canopy.
24 Sawleaf zelkova Zelkova serrata 10 25 20 No 2.6 3 E N Fair Tree overhangs road but has high clearance. 25 Chinese pistache Pistacia chinensis 7.5 25 15 No 2.0 3 N N Fair Overhangs road but has high clearance. Branch ends previously pruned.
26 Sawleaf zelkova Zelkova serrata 9 25 15 No 2.4 2.5 E N Fair Tree overhangs road but has high clearance. 27 London plane tree Platanus x hispanica 31.5 50 30 Yes 8.2 24 N Y Fair Overhangs work area. 28 Olive Olea europaea 15.5, 15.5 30 15 No 6.0 2.4 Y Y Poor Does not overhang work area. Major dead wood in trunk.
29 Sawleaf zelkova Zelkova serrata 11 30 15 Yes 2.9 4 N N Fair Overhangs work area. 217
Arborist Report for the State Streets Pavement Rehabilitation Project C-2 ESA / D202300227.00 City of West Sacramento, California April 2024
Tree
Number Common Name Scientific Name
Diameter at
Breast Height
(DBH) (inches)
Height (feet) Dripline (feet) Tree Pruning
Required
Structural
Root Zone
(feet)
Estimated
Distance to
Edge of Work
Area (feet)
Construction
Work Planned
in Structural
Root Zone
Heritage Tree Condition Notes
30 Saucer magnolia Magnolia soulangeana 6, 6, 6, 9 30 10 No 3.7 4 E Y Good-Fair Partially overhangs road but has high clearance. Owner would like to prune if required.
31 Saucer magnolia Magnolia soulangeana 5, 5.5 20 10 No 2.0 3.5 N N Fair Minor overhang but has high clearance. Owner would like to prune if required.
32 Sawleaf zelkova Zelkova serrata 10 30 15 No 2.6 3.5 N N Fair Partially overhangs road but has high clearance. 33 Sawleaf zelkova Zelkova serrata 8 25 7 No 2.1 4.5 N N Fair Partially overhangs road but has high clearance. Minor small branches may need pruning.
34 White mulberry Morus alba 19.5 10 0 Maybe 5.1 3.5 Y N Fair-Poor Tree pollarded, nothing currently overhangs work area.
May have long sprouts at time of work which require
pruning.
35 Olive Olea europaea 20 30 20 Maybe 5.2 2.5 Y N Fair Overhangs road but has high clearance. 36 English walnut Juglans regia 11.5 15 10 No 3.0 N/A N N Fair Project redesigned and no longer impacts this tree. 37 Sawleaf zelkova Zelkova serrata 7 18 7 No 1.8 N/A N N Fair Minor overhang, high clearance. Project redesigned and no longer impacts this tree.
38 Chinese pistache Pistacia chinensis 5 15 7 No 1.3 N/A N N Fair Project redesigned and no longer impacts this tree. 39 Sawleaf zelkova Zelkova serrata 11.5 25 20 No 3.0 N/A N N Fair Project redesigned and no longer impacts this tree. 40 Valley oak Quercus lobata 3.5, 3.5 18 10 No 1.3 N/A N N Fair Project redesigned and no longer impacts this tree. 41 Crape myrtle Lagerstroemia indica 7.5 20 12 No 2.0 N/A N N Fair Project redesigned and no longer impacts this tree. 42 Crape myrtle Lagerstroemia indica 8.5 23 12 No 2.2 N/A N N Fair Project redesigned and no longer impacts this tree. 43 Crape myrtle Lagerstroemia indica 8, 3 25 10 No 2.2 N/A N N Fair Project redesigned and no longer impacts this tree. 44 Flowering plum Prunus sp. 7.5, 3 20 15 No 2.1 N/A N N Fair Project redesigned and no longer impacts this tree. 45 Flowering plum Prunus sp. 4 20 7 No 1.0 N/A N N Poor Tree nearly dead. Project redesigned and no longer impacts this tree.
46 Sawleaf zelkova Zelkova serrata 6 25 7 No 1.6 N/A N N Fair Canopy has sufficient clearance. Project redesigned and no longer impacts this tree.
47 Sawleaf zelkova Zelkova serrata 6.5 25 10 No 1.7 N/A N N Fair Canopy has sufficient clearance. Project redesigned and no longer impacts this tree.
48 Sawleaf zelkova Zelkova serrata 5.5 25 10 No 1.4 N/A N N Fair Canopy has sufficient clearance. Project redesigned and no longer impacts this tree.
49 Chinese pistache Pistacia chinensis 7.5 25 12 No 2.0 N/A N N Good-Fair Project redesigned and no longer impacts this tree. 50 Valley oak Quercus lobata 9.5 25 20 No 2.5 N/A N N Good-Fair Project redesigned and no longer impacts this tree. 51 Sawleaf zelkova Zelkova serrata 12 25 15 No 3.1 N/A N N Fair Project redesigned and no longer impacts this tree. 52 Pin oak Quercus palustris 12.5 30 20 No 3.3 N/A N N Good-Fair Project redesigned and no longer impacts this tree. 53 Chinese pistache Pistacia chinensis 10 25 15 No 2.6 N/A N N Good-Fair Project redesigned and no longer impacts this tree. 54 Chinese pistache Pistacia chinensis 11 30 20 No 2.9 N/A N N Fair Project redesigned and no longer impacts this tree. 55 Chinese pistache Pistacia chinensis 11.5 30 15 No 3.0 N/A N N Fair Project redesigned and no longer impacts this tree. 56 Valley oak Quercus lobata 22 40 20 No 5.8 N/A N Y Good Project redesigned and no longer impacts this tree. 57 London plane tree Platanus x hispanica 45 55 30 No 11.8 N/A N Y Good-Fair Project redesigned and no longer impacts this tree. 58 Pecan Carya illinoinensis 22 45 25 No 5.8 N/A N N Fair Tree overhangs work area but has high clearance.
Some pruning of small branches may be required.
59 London plane tree Platanus x hispanica 20 47 25 No 5.2 N/A N N Fair Project redesigned and no longer impacts this tree. 60 River birch Betula nigra 18 40 30 No 4.7 7 N N Fair Overhangs work area but has high clearance. 61 Pin oak Quercus palustris 12.5 35 20 No 3.3 2 Y N Good-Fair Partially overhangs work area, pruning of lower branches may be required.
62 Southern magnolia Magnolia grandiflora 26 40 20 No 6.8 N/A N Y Good-Fair Project redesigned and no longer impacts this tree. 218
Arborist Report for the State Streets Pavement Rehabilitation Project C-3 ESA / D202300227.00 City of West Sacramento, California April 2024
Tree
Number Common Name Scientific Name
Diameter at
Breast Height
(DBH) (inches)
Height (feet) Dripline (feet) Tree Pruning
Required
Structural
Root Zone
(feet)
Estimated
Distance to
Edge of Work
Area (feet)
Construction
Work Planned
in Structural
Root Zone
Heritage Tree Condition Notes
63 Ash Fraxinus sp. 30 35 20 No 7.9 N/A N Y Fair-Poor Project redesigned and no longer impacts this tree. 64 Southern magnolia Magnolia grandiflora 10.5, 16 30 20 Maybe 5.0 8.5 N Y Fair Partially overhangs work area, pruning of lower branches may be required.
65 American sweetgum LIquidambar styraciflua 18 40 20 No 4.7 7 N N Fair Overhangs work area but has high clearance. 66 London plane tree Platanus x hispanica 30 45 20 No 7.9 12 N Y Fair Overhangs work area but has high clearance. 67 Coast redwood Sequoia sempervirens 40 60 15 No 10.5 N/A N Y Good-Fair Project redesigned and no longer impacts this tree. 68 Camphor tree Camphora officinarum 26 30 15 No 6.8 6 N Y Fair Overhangs work area but has high clearance. Roots previously pruned adjacent to sidewalk retaining wall.
69 Maple Acer sp. 23 50 20 No 6.0 9 N N Fair Overhangs work area but has high clearance. 70 Pin oak Quercus palustris 11 25 15 Maybe 2.9 3.25 N N Good-Fair Partially overhangs work area, pruning of lower branches may be required.
71 Chinese pistache Pistacia chinensis 6.5 25 15 No 1.7 3 N N Fair Overhangs work area but has high clearance. 72 Chinese pistache Pistacia chinensis 6.5 25 15 No 1.7 3 N N Fair Overhangs work area but has high clearance. 73 Chinese pistache Pistacia chinensis 7 20 10 No 1.8 3 N N Fair Overhangs work area but has high clearance. 74 Chinese pistache Pistacia chinensis 9 20 10 No 2.4 3 N N Fair Overhangs work area but has high clearance. 75 Pin oak Quercus palustris 20 40 25 Maybe 5.2 8 N Y Fair Small lower limbs overhanging work area may need pruning.
76 Maple Acer sp. 16 40 15 No 4.2 4 E N Fair Overhangs work area but has high clearance. 77 Carolina laurel cherry Prunus caroliniana 9 30 10 No 2.4 N/A N N Fair Project redesigned and no longer impacts this tree. 78 Valley oak Quercus lobata 28 50 25 Maybe 7.3 10 Y Y Fair Small lower limbs overhanging work area may require pruning.
79 Sawleaf zelkova Zelkova serrata 8 20 12 Maybe 2.1 7.75 N N Fair Small lower limbs overhanging work area may require pruning.
80 English walnut Juglans regia 15 20 17 Maybe 3.9 5 N N Fair Small lower limbs overhanging work area may need pruning.
81 Black locust Robinia pseudoacacia 45 40 20 Maybe 11.8 9 Y Y Fair-Poor Small lower limbs overhanging work area may require pruning.
82 Cork oak Quercus suber 25 45 20 No 6.5 N/A N Y Good-Fair Project redesigned and no longer impacts this tree. 83 Canary Island pine Pinus canariensis 17 40 13 No 4.5 N/A N N Fair Project redesigned and no longer impacts this tree. 84 Deodar cedar Cedrus deodara 48 45 30 No 12.6 N/A N Y Fair Project redesigned and no longer impacts this tree. 85 Cork oak Quercus suber 50 55 25 No 13.1 N/A N Y Fair Project redesigned and no longer impacts this tree. 86 Incense cedar Calocedrus decurrens 36 50 20 No 9.4 N/A N Y Fair Project redesigned and no longer impacts this tree. 87 Coast redwood Sequoia sempervirens 15 45 10 No 3.9 N/A N N Good Project redesigned and no longer impacts this tree. 88 Coast redwood Sequoia sempervirens 15 45 10 No 3.9 N/A N N Good Project redesigned and no longer impacts this tree. 89 Coast redwood Sequoia sempervirens 15 45 10 No 3.9 N/A N N Good Project redesigned and no longer impacts this tree. 90 Incense cedar Calocedrus decurrens 38 55 25 No 9.9 N/A N Y Fair-Poor Project redesigned and no longer impacts this tree. 91 Deodar cedar Cedrus deodara 36 45 30 No 9.4 N/A N Y Fair Project redesigned and no longer impacts this tree. 92 Flowering plum Prunus sp. 8 15 10 No 2.1 N/A N N Fair Project redesigned and no longer impacts this tree. 93 Bradford pear Pyrus calleryana 19 35 20 No 5.0 N/A N N Fair Project redesigned and no longer impacts this tree. 94 Crape Myrtle Lagerstroemia indica 7 30 10 Maybe 1.8 8 N N Fair Small lower limbs overhanging work area may require pruning.
95 Incense cedar Calocedrus decurrens 38 45 15 No 9.9 N/A N Y Fair-Poor Project redesigned and no longer impacts this tree. 96 River birch Betula nigra 18 30 25 Maybe 4.7 5 N N Good-Fair Small lower limbs overhanging work area may require pruning.
219
Arborist Report for the State Streets Pavement Rehabilitation Project C-4 ESA / D202300227.00 City of West Sacramento, California April 2024
Tree
Number Common Name Scientific Name
Diameter at
Breast Height
(DBH) (inches)
Height (feet) Dripline (feet) Tree Pruning
Required
Structural
Root Zone
(feet)
Estimated
Distance to
Edge of Work
Area (feet)
Construction
Work Planned
in Structural
Root Zone
Heritage Tree Condition Notes
97 Chinese tallow Triadica sebifera 26 25 20 Maybe 6.8 12 N Y Fair Small lower limbs overhanging work area may require pruning. Roots are uplifting and cracking sidewalk.
98 White mulberry Morus alba 22 20 20 Maybe 5.8 10 N N Fair-Poor Small lower limbs overhanging work area may require pruning.
99 Coast redwood Sequoia sempervirens 20 25 15 Maybe 5.2 8 N N Fair Small lower limbs overhanging work area may require pruning.
100 Ash Fraxinus sp. 34 30 20 No 8.9 N/A N Y Fair Project redesigned and no longer impacts this tree. 101 Maple Acer sp. 12 20 15 Maybe 3.1 6 N N Fair Small lower limbs overhanging work area may require pruning.
102 Valley oak Quercus lobata 17 30 20 Maybe 4.5 2 Y Y Fair Small overhanging branches may require minor pruning for equipment clearance.
103 Red maple Acer rubrum 13 30 10 Maybe 3.4 2 Y N Good-Fair Generally has high clearance but may require pruning of small branches.
104 London plane Platanus x hispanica 26.5 35 20 No 6.9 3 Y Y Fair High clearance. Unlikely to require pruning. 105 London plane Platanus x hispanica 19.5 35 20 No 5.1 4 Y N Fair High clearance. Unlikely to require pruning. 106 London plane Platanus x hispanica 18.5 35 20 No 4.8 3 Y N Fair-Poor High clearance. Unlikely to require pruning. 107 London plane Platanus x hispanica 29.5 50 30 No 7.7 2 Y Y Fair High clearance. Unlikely to require pruning. 108 London plane Platanus x hispanica 34 55 30 No 8.9 0 Y Y Fair High clearance. Unlikely to require pruning. Roots
growing over curb and sidewalk. Cracking in road and
sidewalk lifting from roots.
109 Chinese pistache Pistacia chinensis 13 25 20 Yes 3.4 2 Y N Good-Fair Small lower branches will likely require pruning. 110 Chinese pistache Pistacia chinensis 9 25 15 No 2.4 2 E N Good-Fair High clearance. Unlikely to require pruning. 111 Bradford pear Pyrus calleryana 12 30 20 Maybe 3.1 2 Y N Fair May require pruning of small overhanging branches for equipment access.
112 Valley oak Quercus lobata 15.5 35 20 Maybe 4.1 2 Y N Good-Fair May require pruning of small overhanging branches for equipment access.
113 Valley oak Quercus lobata 12 30 20 Maybe 3.1 14.25 N N Fair May require pruning of small overhanging branches for equipment access.
114 Valley oak Quercus lobata 39.5 50 30 Maybe 10.3 22.5 N Y Fair May require pruning of small overhanging branches for equipment access.
115 Valley oak Quercus lobata 42 55 50 Maybe 11.0 14.75 N Y Fair May require pruning of small overhanging branches for equipment access.
116 Valley oak Quercus lobata 40 50 40 Maybe 10.5 24 N Y Fair May require pruning of small overhanging branches for equipment access.
117 Valley oak Quercus lobata 16 35 20 Maybe 4.2 2 Y Y Fair May require pruning of small overhanging branches for
equipment access. Adjacent curb has been removed
and lateral root exposed.
118 London plane Platanus x hispanica 23 50 30 No 6.0 4 Y N Fair High clearance. Unlikely to require pruning. 119 Coast redwood Sequoia sempervirens 21 50 12 Maybe 5.5 4 Y N Good May require pruning of small overhanging branches for equipment access.
120 Coast redwood Sequoia sempervirens 19.5 50 12 No 5.1 3.5 Y N Good High clearance. Unlikely to require pruning. 121 London plane Platanus x hispanica 27 50 25 No 7.1 4 Y Y Fair High clearance. Unlikely to require pruning. 122 London plane Platanus x hispanica 24 50 25 No 6.3 4 Y Y Fair High clearance. Unlikely to require pruning. 220
Arborist Report for the State Streets Pavement Rehabilitation Project C-5 ESA / D202300227.00 City of West Sacramento, California April 2024
Tree
Number Common Name Scientific Name
Diameter at
Breast Height
(DBH) (inches)
Height (feet) Dripline (feet) Tree Pruning
Required
Structural
Root Zone
(feet)
Estimated
Distance to
Edge of Work
Area (feet)
Construction
Work Planned
in Structural
Root Zone
Heritage Tree Condition Notes
123 Chinese pistache Pistacia chinensis 12 30 15 No 3.1 4 N N Good-Fair High clearance. Unlikely to require pruning. 124 Chinese pistache Pistacia chinensis 9.5 25 20 No 2.5 4 N N Good-Fair High clearance. Unlikely to require pruning. 125 Empress tree Paulownia tomentosa 8.5 25 12 N 2.2 5.5 N N Fair High clearance. Unlikely to require pruning. Top has
been pruned due to dead wood according to property
owner.
126 White mulberry Morus alba 24.5 40 30 No 6.4 3.5 Y Y Fair High clearance. Unlikely to require pruning. Adjacent curb is breaking likely from roots.
127 Chinese pistache Pistacia chinensis 10 30 20 No 2.6 4 N N Good-Fair High clearance. Unlikely to require pruning. 128 White mulberry Morus alba 23 40 25 Maybe 6.0 3.5 Y N Fair-Poor Minor low hanging branches may require pruning for equipment access.
129 Chinese pistache Pistacia chinensis 11.5 25 20 No 3.0 4.5 N N Good-Fair High clearance. Unlikely to require pruning. 130 Chinese pistache Pistacia chinensis 11.5 25 20 No 3.0 4.5 N N Good-Fair High clearance. Unlikely to require pruning. 131 Chinese pistache Pistacia chinensis 10 20 20 No 2.6 4.5 N N Good-Fair High clearance. Unlikely to require pruning. 132 Silver maple Acer saccharinum 14.5, 10.5 30 15 No 4.7 2.5 Y Y Good-Fair High clearance. Unlikely to require pruning. 133 Chinese pistache Pistacia chinensis 8 25 15 No 2.1 2.5 E N Fair High clearance. Unlikely to require pruning. 134 Maple Acer sp. 6 30 10 No 1.6 3 N N Fair High clearance. Unlikely to require pruning. 135 Maple Acer sp. 7.5 30 10 No 2.0 2.75 N N Good-Fair High clearance. Unlikely to require pruning. 136 Maple Acer sp. 8.5 30 15 No 2.2 3.25 N N Good-Fair High clearance. Unlikely to require pruning. 137 Maple Acer sp. 9 30 15 No 2.4 2.75 E N Good-Fair High clearance. Unlikely to require pruning. 138 Crape myrtle Lagerstroemia indica 4 15 8 No 1.0 3.75 N N Good-Fair High clearance. Unlikely to require pruning. 139 Camphor tree Camphora officinarum 18 30 20 No 4.7 3.5 Y N Fair-Poor High clearance. Unlikely to require pruning. 140 Camphor tree Camphora officinarum 16.5 30 20 Maybe 4.3 3 Y N Fair-Poor Minor low hanging branches may require pruning for equipment access.
141 Crape myrtle Lagerstroemia indica 4 20 10 No 1.0 4.5 N N Fair High clearance. Unlikely to require pruning. 142 Camphor tree Camphora officinarum 13 30 20 Maybe 3.4 3.5 E N Fair-Poor Minor low hanging branches may require pruning for equipment access.
143 Maple Acer sp. 12 30 20 Maybe 3.1 3.5 E N Fair Minor low hanging branches may require pruning for equipment access.
144 Chinese pistache Pistacia chinensis 7 25 15 Maybe 1.8 4.5 N N Good-Fair Minor low hanging branches may require pruning for equipment access.
145 London plane Platanus x hispanica 15.5 40 20 No 4.1 3.25 Y N Good-Fair High clearance. Unlikely to require pruning. 146 London plane Platanus x hispanica 17.5 40 25 Maybe 4.6 3.25 Y N Good-Fair Minor low hanging branches may require pruning for equipment access.
147 London plane Platanus x hispanica 14.5 40 20 No 3.8 3 Y N Good-Fair High clearance. Unlikely to require pruning. 148 London plane Platanus x hispanica 18.5 55 20 Maybe 4.8 3.5 Y N Fair Minor low hanging branches may require pruning for equipment access.
149 London plane Platanus x hispanica 13.5 40 15 Maybe 3.5 3.75 E N Fair Minor low hanging branches may require pruning for equipment access.
150 Chinese elm Ulmus parvifolia 11.5 30 15 No 3.0 4 N N Fair High clearance. Unlikely to require pruning. 151 London plane Platanus x hispanica 15 45 20 No 3.9 3 Y N Fair High clearance. Unlikely to require pruning. 221
Arborist Report for the State Streets Pavement Rehabilitation Project C-6 ESA / D202300227.00 City of West Sacramento, California April 2024
Tree
Number Common Name Scientific Name
Diameter at
Breast Height
(DBH) (inches)
Height (feet) Dripline (feet) Tree Pruning
Required
Structural
Root Zone
(feet)
Estimated
Distance to
Edge of Work
Area (feet)
Construction
Work Planned
in Structural
Root Zone
Heritage Tree Condition Notes
152 Maple Acer sp. 6.5 25 10 Maybe 1.7 3.5 N N Good Minor low hanging branches may require pruning for equipment access.
153 Blue gum eucalyptus Eucalyptus globulus 19 50 20 No 5.0 4.25 Y N Fair High clearance. Unlikely to require pruning. 154 Coast redwood Sequoia sempervirens 13 30 10 Maybe 3.4 4.25 N N Good-Fair Minor low hanging branches may require pruning for equipment access.
155 Chinese elm Ulmus parvifolia 6.5 15 8 No 1.7 4.25 N N Poor High clearance. Unlikely to require pruning. Tree is severely topped.
156 Coast redwood Sequoia sempervirens 17 40 10 Maybe 4.5 3.5 Y N Good-Fair Minor low hanging branches may require pruning for equipment access.
157 Chinese pistache Pistacia chinensis 9 30 15 Maybe 2.4 4.25 N N Fair Minor low hanging branches may require pruning for equipment access.
158 Chinese pistache Pistacia chinensis 9 25 15 Maybe 2.4 3.75 N N Fair Minor low hanging branches may require pruning for equipment access.
159 Crape myrtle Lagerstroemia indica 3.5, 3.5, 3 20 7 No 1.6 3.75 N N Good High clearance. Unlikely to require pruning. 160 London plane Platanus x hispanica 28 45 25 No 7.3 2 Y Y Fair-Poor High clearance. Unlikely to require pruning. Roots pushing against curb.
161 Sawleaf zelkova Zelkova serrata 27.5 30 15 No 7.2 2.5 Y Y Fair-Poor High clearance. Unlikely to require pruning. 162 English walnut Juglans regia 10.5 15 10 No 2.7 3.5 N N Poor High clearance. Unlikely to require pruning. 163 English walnut Juglans regia 15 15 15 No 3.9 3.5 E N Fair-Poor High clearance. Unlikely to require pruning. Curb adjacent to tree is gone.
164 Almond Prunus dulcis 10 20 15 Yes 2.6 3 E N Fair Small overhanging branches may require pruning. 165 English walnut Juglans regia 7 20 10 Maybe 1.8 4 N N Fair Small overhanging branches may require pruning. 166 Cherry Prunus sp. 12.5 25 10 Maybe 3.3 2.75 Y N Fair Small overhanging branches may require pruning for equipment access.
167 Olive Olea europaea 4 12 5 No 1.0 4 N N Fair High clearance. Unlikely to require pruning. 168 Olive Olea europaea 17 15 6 No 4.5 2.75 Y N Fair High clearance. Unlikely to require pruning. 169 Olive Olea europaea 14 12 6 No 3.7 2 Y N Fair High clearance. Unlikely to require pruning. 170 English walnut Juglans regia 8.5 15 10 No 2.2 3.5 N N Fair High clearance. Unlikely to require pruning. 171 Almond Prunus dulcis 6 15 5 No 1.6 4.5 N N Fair High clearance. Unlikely to require pruning. 172 Crape Myrtle Lagerstroemia indica 4 5 1 No 1.0 5 N N Fair No overhanging branches, tree is pollarded. Some
growth is anticipated before construction, but unlikely to require pruning.
173 Crape Myrtle Lagerstroemia indica 5 10 1 No 1.3 5 N N Fair No overhanging branches, tree is pollarded. Some
growth is anticipated before construction, but unlikely to require pruning.
174 Bradford pear Pyrus calleryana 9 30 10 No 2.4 3.5 N N Fair No overhanging branches. No pruning required. 175 Sawleaf zelkova Zelkova serrata 11 30 15 No 2.9 4.25 N N Poor High clearance. Unlikely to require pruning. 176 Mexican fan palm Washingtonia robusta 20.5 80 10 No 5.4 3.75 Y N Good-Fair No overhanging branches. No pruning required. 177 English walnut Juglans regia 8, 8 30 15 No 3.0 3.25 E N Fair High clearance. Unlikely to require pruning. 178 Silver maple Acer saccharinum 13 40 15 No 3.4 3 E N Fair-Poor High clearance. Unlikely to require pruning. 179 Bradford pear Pyrus calleryana 13 40 15 No 3.4 3 E N Fair High clearance. Unlikely to require pruning. 222
Arborist Report for the State Streets Pavement Rehabilitation Project C-7 ESA / D202300227.00 City of West Sacramento, California April 2024
Tree
Number Common Name Scientific Name
Diameter at
Breast Height
(DBH) (inches)
Height (feet) Dripline (feet) Tree Pruning
Required
Structural
Root Zone
(feet)
Estimated
Distance to
Edge of Work
Area (feet)
Construction
Work Planned
in Structural
Root Zone
Heritage Tree Condition Notes
180 Pin oak Quercus palustris 12.5 35 15 No 3.3 2.75 Y N Good-Fair High clearance. Unlikely to require pruning. 181 Pin oak Quercus palustris 8 35 10 No 2.1 2.5 E N Good-Fair High clearance. Unlikely to require pruning. 182 Ash Fraxinus sp. 13 40 20 No 3.4 2.5 Y N Good-Fair High clearance. Unlikely to require pruning. Some smaller roots visible at curb causing cracking.
183 Ash Fraxinus sp. 22 50 15 No 5.8 3.5 Y N Fair-Poor High clearance. Unlikely to require pruning. Roots visible at curb. Curb looks new.
184 London plane Platanus x hispanica 16 50 15 No 4.2 3 Y N Good-Fair High clearance. Unlikely to require pruning. 185 Silver maple Acer saccharinum 10 30 10 Yes 2.6 3.5 N N Good-Fair Small overhanging branches likely to require pruning for construction access.
186 Crape myrtle Lagerstroemia indica 11.5 20 10 No 3.0 4 N N Good-Fair High clearance. Unlikely to require pruning. 187 White mulberry Morus alba 14 8 1 Maybe 3.7 4 E N Fair Tree currently pollarded with no branches. Long branches may grow into work area by construction.
188 Silver maple Acer saccharinum 10 30 10 No 2.6 3.5 N N Good-Fair High clearance. Unlikely to require pruning. Small roots visible at curb.
189 Silver maple Acer saccharinum 10 35 15 No 2.6 4 N N Good-Fair High clearance. Unlikely to require pruning. 190 Star magnolia Magnolia stellata 4.5, 4 20 7 No 1.6 4.5 N N Fair High clearance. Unlikely to require pruning. 191 London plane Platanus x hispanica 25 55 15 No 6.5 3.25 Y Y Fair-Poor High clearance. Unlikely to require pruning. 192 Siberian elm Ulmus pumila 5 25 8 No 1.3 4.5 N N Fair-Poor High clearance. Unlikely to require pruning. 193 Ash Fraxinus sp. 33.5 30 10 Maybe 8.8 3 Y Y Poor Small overhanging branches may require pruning for equipment access.
194 Orange Citrus sinensis 5 15 5 No 1.3 4 N N Good-Fair High clearance. Unlikely to require pruning. 195 Crape Myrtle Lagerstroemia indica 8 17 5 No 2.1 4.5 N N Good-Fair High clearance. Unlikely to require pruning. 196 Crape Myrtle Lagerstroemia indica 6 17 7 No 1.6 4.5 N N Good-Fair High clearance. Unlikely to require pruning. 197 Saucer magnolia Magnolia X soulangeana 24 50 10 No 6.3 2.75 Y Y Fair High clearance. Unlikely to require canopy pruning.
Large roots at curb, some cracking curb.
198 Mexican fan palm Washingtonia robusta 15.5 70 5 No 4.1 4.5 E N Good-Fair High clearance. Unlikely to require pruning. 199 Japanese loquat Eriobotrya japonica 3, 5, 4.5, 4 25 10 Yes 2.2 4.25 N N Good Low overhanging branches likely will require pruning for equipment access
200 Ash Fraxinus sp. 5 15 6 No 1.3 4.5 N N Good-Fair High clearance. Unlikely to require pruning. 201 Maple Acer sp. 5 17 7 Yes 1.3 4 N N Good-Fair Low overhanging branches likely will require pruning for equipment access
202 Flowering plum Prunus sp. 10, 4, 4, 6, 7 30 10 Maybe 3.8 3.75 E Y Fair Small low overhanging branches may require pruning for equipment access
203 Flowering plum Prunus sp. 13 18 10 No 3.4 4 N N Poor High clearance. Unlikely to require pruning. 204 London plane Platanus x hispanica 18.5 45 20 No 4.8 3.5 Y N Good-Fair High clearance. Unlikely to require pruning. 205 Bradford pear Pyrus calleryana 13.5 35 15 No 3.5 4 E N Poor High clearance. Unlikely to require pruning. 206 Valley oak Quercus lobata 15.5 45 20 No 4.1 3.75 E N Fair High clearance. Unlikely to require pruning. 207 Eastern redbud Cercis canadensis 6.5 20 10 No 1.7 4 N N Good-Fair High clearance. Unlikely to require pruning. Medium sized roots at curb line. Some areas of curb gone.
223
Arborist Report for the State Streets Pavement Rehabilitation Project C-8 ESA / D202300227.00 City of West Sacramento, California April 2024
Tree
Number Common Name Scientific Name
Diameter at
Breast Height
(DBH) (inches)
Height (feet) Dripline (feet) Tree Pruning
Required
Structural
Root Zone
(feet)
Estimated
Distance to
Edge of Work
Area (feet)
Construction
Work Planned
in Structural
Root Zone
Heritage Tree Condition Notes
208 English walnut Juglans regia 15 20 10 No 3.9 3.25 Y N Fair-Poor High clearance. Unlikely to require pruning. Roots parallel to curb.
209 Edible fig Ficus carica 22.5 15 10 Yes 5.9 3.5 Y N Poor Small overhanging branches will likely require pruning for equipment access. Roots visible at curb.
210 Maple Acer sp. 3.5 18 7 No 0.9 4.5 N N Good-Fair High clearance. Unlikely to require pruning. 211 London plane Platanus x hispanica 22.5 65 25 No 5.9 3.25 Y N Good-Fair High clearance. Unlikely to require pruning. Roots growing parallel to curb.
212 London plane Platanus x hispanica 23 65 30 No 6.0 2.5 Y N Good-Fair High clearance. Unlikely to require pruning. Large roots parallel to curb.
213 London plane Platanus x hispanica 17.5 65 20 No 4.6 3.25 Y N Good-Fair High clearance. Unlikely to require pruning. 214 London plane Platanus x hispanica 21.5 50 15 No 5.6 3.5 Y N Fair-Poor High clearance. Unlikely to require pruning. 215 Valley oak Quercus lobata 13 40 15 No 3.4 3.75 E N Fair High clearance. Unlikely to require pruning. 216 Ash Fraxinus sp. 9 30 15 Yes 2.4 3.75 N N Fair Small overhanging branches will likely require pruning 217 Ash Fraxinus sp. 6 20 7 No 1.6 4.25 N N Good-Fair High clearance. Unlikely to require pruning. 218 Silver maple Acer saccharinum 28 45 20 Maybe 7.3 3 Y Y Good-Fair Small overhanging branches may require pruning. 219 Gingko Gingko biloba 8.5 30 10 No 2.2 4 N N Good High clearance. Unlikely to require pruning. 220 Gingko Gingko biloba 13 40 15 No 3.4 4 N N Good-Fair Small overhanging branches may require pruning. 221 Gingko Gingko biloba 9 30 10 No 2.4 3 N N Good-Fair High clearance. Unlikely to require pruning. 222 Gingko Gingko biloba 7 25 7 No 1.8 3.5 N N Good-Fair High clearance. Unlikely to require pruning. 223 Pin oak Quercus palustris 10.5 30 15 No 2.7 3 E N Good-Fair High clearance. Unlikely to require pruning. 224 Pin oak Quercus palustris 10.5 30 15 No 2.7 2.5 E N Good-Fair High clearance. Unlikely to require pruning. 225 Pin oak Quercus palustris 7 30 10 Maybe 1.8 3 N N Fair Several small branches may require pruning. 226 Pin oak Quercus palustris 10.5 30 10 No 2.7 3 E N Good-Fair High clearance. Unlikely to require pruning. 227 Pin oak Quercus palustris 16 35 15 No 4.2 2.25 Y N Good-Fair High clearance. Unlikely to require pruning. 228 Pin oak Quercus palustris 13.5 35 20 No 3.5 3 E N Fair High clearance. Unlikely to require pruning. 229 Chinese pistache Pistacia chinensis 9 25 10 No 2.4 3.25 N N Good-Fair High clearance. Unlikely to require pruning. 230 Chinese pistache Pistacia chinensis 8 20 10 No 2.1 3.5 N N Fair High clearance. Unlikely to require pruning. 231 Chinese pistache Pistacia chinensis 11 30 15 Maybe 2.9 3.25 E N Fair Small overhanging branches may require pruning for equipment access.
232 Pin oak Quercus palustris 11 30 15 Maybe 2.9 3 E N Good-Fair Small overhanging branches may require pruning for equipment access.
233 Pin oak Quercus palustris 12 30 15 No 3.1 3 E N Good-Fair High clearance. Unlikely to require pruning. 234 Pin oak Quercus palustris 7 25 10 Maybe 1.8 3.25 N N Good-Fair Small overhanging branches may require pruning for equipment access.
235 Silver maple Acer saccharinum 16 40 15 Maybe 4.2 4.25 E N Good-Fair Small overhanging branches may require pruning for equipment access.
236 Chinese pistache Pistacia chinensis 9 25 10 No 2.4 4 N N Fair High clearance. Unlikely to require pruning. 237 Silver maple Acer saccharinum 15.5 40 15 No 4.1 4 E N Good-Fair High clearance. Unlikely to require pruning. 224
Arborist Report for the State Streets Pavement Rehabilitation Project C-9 ESA / D202300227.00 City of West Sacramento, California April 2024
Tree
Number Common Name Scientific Name
Diameter at
Breast Height
(DBH) (inches)
Height (feet) Dripline (feet) Tree Pruning
Required
Structural
Root Zone
(feet)
Estimated
Distance to
Edge of Work
Area (feet)
Construction
Work Planned
in Structural
Root Zone
Heritage Tree Condition Notes
238 Silver maple Acer saccharinum 11.5 35 15 Maybe 3.0 4.25 N N Fair Small overhanging branches may require pruning for equipment access.
239 Chinese pistache Pistacia chinensis 7 20 10 Maybe 1.8 3.5 N N Fair Small overhanging branches may require pruning for equipment access.
240 London plane Platanus x hispanica 12 50 20 No 3.1 3.5 E N Good-Fair High clearance. Unlikely to require pruning. 241 Incense cedar Calocedrus decurrens 8 25 7 Yes 2.1 4 N N Good Small overhanging branches will likely require pruning for equipment access.
242 Chinese pistache Pistacia chinensis 7.5 20 10 No 2.0 4.5 N N Fair High clearance. Unlikely to require pruning. 243 Chinese pistache Pistacia chinensis 8 25 10 No 2.1 4 N N Fair High clearance. Unlikely to require pruning. 244 Chinese pistache Pistacia chinensis 10 30 15 Maybe 2.6 4 N N Fair Small overhanging branches may require pruning for equipment access.
245 Chinese tallow Triadica sebifera 12 35 18 No 3.1 4 N N Fair High clearance. Unlikely to require pruning. 246 Chinese tallow Triadica sebifera 12.5 30 15 No 3.3 3.75 E N Fair High clearance. Unlikely to require pruning. 247 Sawleaf zelkova Zelkova serrata 13 30 15 Maybe 3.4 3.5 E N Fair Small overhanging branches may require pruning for equipment access.
248 Sawleaf zelkova Zelkova serrata 13 30 15 No 3.4 3 E N Fair High clearance. Unlikely to require pruning. 249 Maple Acer sp. 4 20 5 No 1.0 4 N N Good Branches do not overhang sidewalk. 250 Flowering plum Prunus sp. 11 25 10 No 2.9 4 N N Fair High clearance. Unlikely to require pruning. Root at curb.
251 London plane Platanus x hispanica 11 35 20 Yes 2.9 3.5 N N Fair Small overhanging branches may require pruning for equipment access.
252 Chinese pistache Pistacia chinensis 9 25 10 Yes 2.4 4.5 N N Good-Fair Small overhanging branches may require pruning for equipment access.
253 Chinese pistache Pistacia chinensis 7.5 20 10 No 2.0 4.5 N N Good-Fair Generally has high clearance, pruning not likely to be required.
254 London plane Platanus x hispanica 18.5 50 20 Maybe 4.8 4 Y N Fair-Poor Generally has high clearance, may require pruning of small branches.
255 Chinese pistache Pistacia chinensis 8 30 15 Maybe 2.1 4.75 N N Good-Fair Generally has high clearance, may require pruning of small branches.
256 Canary Island date palm Phoenix canariensis 26 50 10 No 6.8 3.25 Y Y Good-Fair Has high clearance, no canopy pruning required. No roots visible at curb.
257 Bradford pear Pyrus calleryana 7.5 50 10 Maybe 2.0 5 N N Fair-Poor Generally has high clearance, may require pruning of small branches.
258 Canary Island date palm Phoenix canariensis 29.5 60 10 No 7.7 4 Y Y Good-Fair Has high clearance, no canopy pruning required.
Numerous small roots at curb.
259 Incense cedar Calocedrus decurrens 4 15 7 Maybe 1.0 4.25 N N Good Small branches at edge of curb may require pruning. 260 Chinese elm Ulmus parvifolia 7.5 25 10 No 2.0 4 N N Good-Fair Generally has high clearance, unlikely to require pruning.
261 Chinese elm Ulmus parvifolia 12 25 15 No 3.1 4 N N Fair Generally has high clearance, unlikely to require pruning.
262 Bradford pear Pyrus calleryana 8.5 35 10 Yes 2.2 5 N N Fair Small overhanging branches may require pruning for equipment access.
225
Arborist Report for the State Streets Pavement Rehabilitation Project C-10 ESA / D202300227.00 City of West Sacramento, California April 2024
Tree
Number Common Name Scientific Name
Diameter at
Breast Height
(DBH) (inches)
Height (feet) Dripline (feet) Tree Pruning
Required
Structural
Root Zone
(feet)
Estimated
Distance to
Edge of Work
Area (feet)
Construction
Work Planned
in Structural
Root Zone
Heritage Tree Condition Notes
263 Silver maple Acer saccharinum 12.5 40 12 Yes 3.3 3 E N Good-Fair Small overhanging branches may require pruning for
equipment access. Large roots at curb, curb broken and
missing.
264 Chinese elm Ulmus parvifolia 13 35 15 No 3.4 3.75 E N Good-Fair Has high clearance, unlikely to require pruning. 265 Silver maple Acer saccharinum 27 60 25 No 7.1 3.25 Y Y Fair Has high clearance, unlikely to require pruning. 266 Chines elm Ulmus parvifolia 12 35 12 No 3.1 4.25 N N Good-Fair Has high clearance, unlikely to require pruning. 267 Chinese pistache Pistacia chinensis 10 30 15 No 2.6 2.5 E N Good-Fair Has high clearance, unlikely to require pruning. 268 Chinese pistache Pistacia chinensis 11 30 15 No 2.9 3 E N Good-Fair Has high clearance, unlikely to require pruning. 269 Chinese pistache Pistacia chinensis 9 30 12 Maybe 2.4 3.25 N N Good-Fair Small overhanging branches may require pruning for equipment access.
270 Chinese pistache Pistacia chinensis 8.5 25 15 Maybe 2.2 2.75 E N Fair-Poor Small overhanging branches may require pruning for equipment access.
271 Chinese elm Ulmus parvifolia 15.5 30 15 No 4.1 3 Y N Fair Generally has high clearance, unlikely to require pruning.
272 Chinese elm Ulmus parvifolia 9 30 15 No 2.4 4 N N Good-Fair Generally has high clearance, unlikely to require pruning.
273 Chinese elm Ulmus parvifolia 13 30 15 Maybe 3.4 3.25 E N Fair Generally has high clearance, may require pruning of small branches.
274 Mimosa tree Albizia julibrissin 24 45 25 No 6.3 20 N Y Fair Has high clearance, unlikely to require pruning. Canopy overhangs work area.
275 Saucer magnolia Magnolia X soulangeana 7, 5.5, 6 25 12 Maybe 2.7 5.5 N N Good-Fair Generally has high clearance, may require minor pruning of small branches.
276 Coast live oak Quercus agrifolia 32 80 25 Yes 8.4 10 N Y Good-Fair Small overhanging branches will likely require pruning for equipment access.
277 Valley oak Quercus lobata 24 80 25 Maybe 6.3 10 N Y Good-Fair Generally has high clearance, may require minor pruning of small branches.
278 Crape myrtle Lagerstroemia indica 9, 8.5, 7 30 15 No 3.7 5 N Y Good-Fair Has high clearance, unlikely to require pruning. 279 Chinese pistache Pistacia chinensis 11 25 15 Maybe 2.9 4 N N Fair Generally has high clearance, may require minor pruning of small branches.
280 Siberian elm Ulmus pumila 6 20 10 No 1.6 4 N N Good-Fair Has high clearance, unlikely to require pruning. 281 Chinese pistache Pistacia chinensis 11.5 30 15 No 3.0 4.25 N N Fair Has high clearance, unlikely to require pruning. 282 Chinese pistache Pistacia chinensis 8.5 30 12 No 2.2 4.25 N N Good-Fair Has high clearance, unlikely to require pruning. 283 Chinese tallow Triadica sebifera 20 35 15 Maybe 5.2 3.25 Y N Fair Generally has high clearance, may require minor pruning of small branches.
284 Gingko Gingko biloba 15.5 35 25 No 4.1 3.75 E N Fair Has high clearance, unlikely to require pruning. Roots visible at curb and possibly lifting roadway.
285 Gingko Gingko biloba 14 45 15 No 3.7 4 E N Good-Fair Has high clearance, unlikely to require pruning. Roots visible at curb.
286 Chinese elm Ulmus parvifolia 6.5 25 12 No 1.7 4.25 N N Good-Fair Has high clearance, unlikely to require pruning. 287 Red oak Quercus sp. 15.5 45 20 No 4.1 3.5 Y N Good-Fair Has high clearance, unlikely to require pruning. 288 Flowering plum Prunus sp. 17 25 10 Maybe 4.5 4 E N Fair Generally has high clearance but may require minor pruning of small branches
226
Arborist Report for the State Streets Pavement Rehabilitation Project C-11 ESA / D202300227.00 City of West Sacramento, California April 2024
Tree
Number Common Name Scientific Name
Diameter at
Breast Height
(DBH) (inches)
Height (feet) Dripline (feet) Tree Pruning
Required
Structural
Root Zone
(feet)
Estimated
Distance to
Edge of Work
Area (feet)
Construction
Work Planned
in Structural
Root Zone
Heritage Tree Condition Notes
289 Chinese pistache Pistacia chinensis 8 25 10 Maybe 2.1 4 N N Good-Fair Generally has high clearance but may require minor pruning of small branches
290 Chinese pistache Pistacia chinensis 8.5 25 10 Maybe 2.2 3.5 N N Fair Generally has high clearance but may require minor pruning of small branches
291 Chinese pistache Pistacia chinensis 7.5 25 12 Maybe 2.0 3.5 N N Fair Generally has high clearance but may require minor pruning of small branches
292 Chinese pistache Pistacia chinensis 14.5 25 12 No 3.8 3.75 E N Fair Has high clearance, unlikely to require pruning. 293 Chinese pistache Pistacia chinensis 8.5 15 10 No 2.2 4.5 N N Fair-Poor Has high clearance, unlikely to require pruning. 294 Chinese pistache Pistacia chinensis 8.5 25 10 No 2.2 3.75 N N Fair-Poor Has high clearance, unlikely to require pruning. 295 White mulberry Morus alba 21.5 12 5 Maybe 5.6 2.75 Y N Fair-Poor Tree is currently pollarded with few shoots - may have longer shoots at time of construction requiring pruning. 296 Dogwood Cornus sp. 5 17 10 Yes 1.3 4 N N Good-Fair Small overhanging branches will likely require pruning. 297 Eastern redbud Cercis canadensis 4, 3 15 5 Yes 1.3 5 N N Good-Fair Small overhanging branches will likely require pruning. 298 Crape myrtle Lagerstroemia indica 2, 2, 2, 1.5, 1.5,
1.5 15 8 Maybe 1.0 4.5 N N Good-Fair Generally has high clearance but small overhanging branches may require minor pruning.
299 Crepe myrtle Lagerstroemia indica 2, 2, 2, 1.5, 1.5 15 6 Maybe 1.0 4.5 N N Good-Fair Generally has high clearance but small overhanging branches may require minor pruning.
300 Crape myrtle Lagerstroemia indica 9.5 30 12 Maybe 2.5 4.5 N N Good-Fair Generally has high clearance but small overhanging branches may require minor pruning.
301 Loquat Eriobotrya japonica 3, 1.5 10 5 Yes 0.9 4.75 N N Fair Small to medium overhanging branches will likely require pruning.
302 Mandarin Citrus reticulata 5.5 10 5 No 1.4 4.5 N N Good-Fair Minimally overhangs work area - unlikely to require pruning.
303 Prunus Prunus sp. 3.5, 3.5, 3, 2.5,
2, 3, 3, 1.5 12 6 Maybe 2.1 4.5 N N Fair Generally has high clearance but small overhanging branches may require minor pruning. 304 Incense cedar Calocedrus decurrens 42 90 20 No 11.0 20 N Y Good-Fair Does not overhang work area - no pruning expected. 305 Chinese elm Ulmus parvifolia 7 25 15 No 1.8 5.25 N N Fair Generally has high clearance, no pruning expected. 306 Chinese pistache Pistacia chinensis 16.5 35 20 No 4.3 4 E N Fair Generally has high clearance, no pruning expected. 227
2600 Capitol Avenue
Suite 200
Sacramento, CA 95816
916.564.4500 phone
916.564.4501 fax
esassoc.com
memorandum
date March 28, 2024
to Lizette Zavala, PE
Project Manager
Bennet Engineering Services + Y&C Transportation Consultants cc Carlton D. Allen, Bennet Engineering Services + Y&C Transportation Consultants Melissa Logue, ESA
LeChi Huynh, ESA
Jessica Orsolini, ESA
from Berlin Hernandez, ESA
subject Bat Habitat Assessment Results for the State Streets Pavement Rehabilitation Project On behalf of the City of West Sacramento, two Environmental Science Associates (ESA) qualified biologists conducted a habitat assessment for roosting bats at the State Streets Pavement Rehabilitation Project (Project) located in the City of West Sacramento, Yolo County, California. The Project is part of the larger City of West Sacramento States Streets Infrastructure Project (Infrastructure Project) which has been largely completed. The Infrastructure Project included replacement of approximately 9,600 feet of water main and rehabilitation of approximately 36,000 feet of sewer main. The State Streets Pavement Rehabilitation Project will repair and/or remove and replace curbs and gutters and install curb ramps that comply with the Americans with Disabilities Act (ADA) within the State Streets neighborhood. The purpose of the habitat assessment was to comply with Mitigation Measure (MM) BIO-2b of the State Streets Infrastructure Initial Study/Mitigated Negative Declaration (IS/MND) and Mitigation Monitoring and Reporting Plan (MMRP) (Horizon Water and Environment, 2019).
MM BIO-2b requires completion of a daytime bat habitat suitability assessment to determine if any of the trees in the project area that may be removed, trimmed, or pruned contain potential colonial bat roosting or indications of bat use. As required by MM BIO-2b, the habitat suitability assessment was conducted prior to the removal or pruning of trees within the project site. As described in this memo, four trees in or adjacent to the project site were determined to provide potentially suitable bat roosting habitat; only two of those trees may be impacted by construction. No bats or active roosts were observed.
228
Bat Habitat Assessment Results for the State Streets Pavement Rehabilitation Project 2 Location
The project is located in the State Streets residential neighborhood of the City of West Sacramento, Yolo County, and is bounded by Jefferson Boulevard to the east, Park Boulevard to the west, 15th Street to the north, and Stone Boulevard to the south. All pavement rehabilitation work will occur on City property along the sidewalk, curb, gutter, and road. Some pruning of private trees on adjacent parcels may be required.
Methods
ESA biologists, Berlin Hernandez and Jessica Orsolini, conducted the daytime habitat assessment for bats on December 26th and 29th, 2023, and March 13th, 14th, and 18th, 2024. An arborist survey was conducted concurrently to determine the potential for tree pruning and removal. The surveys included an inspection of all trees with a minimum 2” diameter at breast height (DBH) within or immediately adjacent to the project footprint.
The survey was completed outside of the bat maternity season, which is typically May 1st to August 31st, depending on bat species. In accordance with MM BIO-2b, trees proposed for removal or pruning in the survey area were inspected for roosting bats, their sign (e.g. guano, staining, smells, or sounds), and suitable habitat (e.g. large tree cavities, basal hollows, loose or peeling bark, larger snags, and palm trees with intact thatch). Trees rooted outside the project footprint, but within approximately 10 feet of proposed work were also assessed due to the potential for noise and vibration or root pruning activities to disturb roosting bats. Trees in the survey area were examined at close range and from a distance using binoculars for the presence of bats, bat sign, or habitat suitable for roosting. As required by MM BIO-2b, each tree was rated on a scale of 1 to 3 (1 = unsuitable/low suitability; 2 = potentially suitable, and 3 = identifiable roost). The location of all trees in the survey area were recorded using Geographic Positioning System (GPS) technology and the rating and bat habitat notes of each tree were recorded in an ArcGIS Field Maps application.
Results
A total of 347 trees in the survey area were examined by the biologists for signs of bat occupancy, bat sign, and suitable bat habitat. No bats, bat sign, or active bat roosts were observed in any of the trees. Four trees were rated 2 due to the presence of potentially suitable bat habitat. Trees with potentially suitable bat habitat are shown in Figure 1 and described below.
Tree 1, a zelkova (Zelkova serrata), was rated 2 due to a substantial number of deep cavities that could provide suitable habitat. This zelkova is an older tree in fair to poor condition with a DBH of 35 inches and a height of approximately 50 feet. After completion of the survey, the project was redesigned to avoid this tree. No construction impacts are anticipated.
Tree 10, a Mexican fan palm (Washingtonia robusta), was rated 2 due to the presence of intact thatch that could provide suitable habitat for a bat roost. This Mexican fan palm is a two-trunked tree in good to fair condition with DBH’s of 22.5 and 21.5 and a height of 50 feet. After completion of the survey, the project was redesigned to avoid this tree. No construction impacts are anticipated.
Tree 256, a Canary Island date palm (Phoenix canariensis), was rated 2 due to the presence of substantial intact thatch that could provide suitable habitat for a bat roost. This Canary Island date palm is in good to fair condition with a DBH of 26 inches and height of 50 feet. Photo 1 below shows the Canary Island date palm. 229
Bat Habitat Assessment Results for the State Streets Pavement Rehabilitation Project 3 Tree 258, a Canary Island date palm (Phoenix canariensis), was rated 2 due to the presence of substantial intact thatch that could provide suitable habitat for a bat roost. This Canary Island date palm is in good to fair condition with a DBH of 29.5 inches and height of 60 feet. Photo 2 below shows the Canary Island date palm.
Data recorded for the trees with potential bat roosting habitat can be found in Table 1. Most of the other trees surveyed were rated 1 due to a lack of snags, cavities, and peeling bark. Several trees rated 1 during the survey did contain cavities; however, due to a lack of depth, and/or poor angle of approach, and/or short distance of the cavity to the ground, these trees were not considered suitable bat roosting habitat. None of these trees had indications of bat use such as guano or staining. Additionally, the entire project area is in a high-density residential neighborhood with limited foraging habitat and frequent disturbance reducing the suitability of the entire area as bat habitat.
TABLE 1
TREES WITH POTENTIAL BAT ROOSTING HABITAT
Tree
Number Species
DBH
(inches)
Potential
Tree
Pruning
Required
Tree Pruning
Comments/Anticipated
Tree Impacts
Bat Habitat
Comments
Distance to
Work Area
(feet)
1 Zelkova
(Zelkova
serrata)
35 No
Branches overhang road
by approximately 10 feet.
Upper canopy previously
pruned for power lines. Will
not be impacted by
construction activities,
project was redesigned to
avoid tree.
Potentially suitable
bat roosting
habitat - has
several deep
cavities. Frequent
pruning for power
lines increases
disturbance and
thereby decreases
bat habitat
suitability.
0 10
Mexican fan
palm
(Washingtonia
robusta)
22.5,
21.5 No
At edge of sidewalk but
away from corner
improvements. Has high
clearance, no canopy
pruning required. Will not
be impacted by
construction activities,
project was redesigned to
avoid tree.
Potential bat
roosting habitat
consists of a
substantial amount
of intact thatch.
10 256
Canary Island
date palm
(Phoenix
canariensis)
26 No
Has high clearance, no
canopy pruning required.
No roots visible at curb.
Will likely require pruning
of roots for curb
improvement.
Potential bat
roosting habitat
consists of a
substantial amount
of intact thatch.
3.25 258
Canary Island
date palm
(Phoenix
canariensis)
29.5 No
Has high clearance, no
canopy pruning required.
Numerous small roots at
curb. Will likely require
pruning of roots for curb
improvement.
Potential bat
roosting habitat
consists of a
substantial amount
of intact thatch.
4 SOURCE: ESA 2023, 2024
Discussion and Recommendations
The surveys conducted on December 26th and 29th, 2023, and March 14th, 15th, and 18th, 2024, satisfy the requirements of MM BIO-2b to conduct a habitat assessment and survey for roosting bats in any trees that are to 230
Bat Habitat Assessment Results for the State Streets Pavement Rehabilitation Project 4 be removed, trimmed, or pruned as part of the Project. Trees rated 1 require no additional measures. Trees rated 2 which will be removed, trimmed, or pruned require completion of an evening emergence survey to determine occupancy status.
Within the survey area, trees 256 and 258, Canary Island date palms, were both rated 2. The trees are about 10 feet apart and are within approximately 4 feet from the proposed curb and gutter improvements. Due to the height of the canopy of these trees, they likely won’t require canopy pruning for construction access. The trees’ roots, however, will likely be impacted by construction of the new curb and gutter. Construction work that directly impacts a tree’s roots or trunk or causes indirect impacts through noise and vibration could result in disturbance of a bat roost if present. Trees 1 and 10, a zelkova and Mexican fan palm, were rated 2 but will not be removed, trimmed, or pruned for construction due to a project redesign.
As required by MM BIO-2b, if construction work will impact the Canary Island date palms that were rated 2, a survey will need to be conducted for bats for a minimum of 2 nights during the maternity season (May 1st to August 31st) using acoustic monitoring and night-vision technology to assess bat use and roosting patterns. If bat roosts are found in any of the trees during the evening surveys, MM BIO-2b requires their rating to be changed to 3 and subsequent implementation of MM BIO-2c to avoid and minimize impacts on bats and bat roosts.
ESA biologists are available to coordinate with Bennett Engineering Services to develop a survey methodology for the City of West Sacramento and the California Department of Fish and Wildlife (CDFW) to review and approve prior to conducting the evening surveys. We appreciate the opportunity to provide services for the City of West Sacramento State Streets Pavement Rehabilitation Project. Please contact me with any questions.
Sincerely,
Berlin Hernandez
Biologist
231
Bat Habitat Assessment Results for the State Streets Pavement Rehabilitation Project 5 State Streets Pavement Rehabilitation Project
Photo 1
Tree 256, a Canary Island date palm with substantial intact thatch that provides potentially suitable bat roosting habitat
232
Bat Habitat Assessment Results for the State Streets Pavement Rehabilitation Project 6 State Streets Pavement Rehabilitation Project
Photo 2
Tree 258, a Canary Island date palm with substantial intact thatch that provides potentially suitable bat roosting habitat
233
ÅÄ84
Park Blvd
16th St
19th St
Vermont Ave
Maryland Ave
Pennsylvania Ave
15th St
Ala
bama Ave.
Virginia Ave
1 10
256
258
Path: U:\GIS\GIS\Projects\2023xxx\D202300227_00_State_Streets_Pavement\03_Project\State_Streets\State_Streets.aprx Fig_1_Bat_Figure, EPimentel 3/27/2024 SOURCE: Esri, 2021; Bennett Engineering Services, 2024; ESA, 2024 State Streets Pavement Rehabilitation Figure 1
Bat Tree Locations
N
0 500
Feet
Project Design Area
Bat Habitat Trees
Impacted by construction activities
Not impacted by construction activities
234
State Streets Pavement Rehabilitation
Project Street
City Work Order Number: 15042
ADDENDUM NO. 6
July 3, 2024, 2024
__________________________________
Bridget McGinnis, Assistant Engineer
CITY OF WEST SACRAMENTO
CAPIAL PROJECT DEPARTMENT
ENGINEERING DIVISION
1110 West Capitol Avenue, First Floor
West Sacramento, California 95691
235
B Street Tower Parklet Project
City Work Order Number: 15053
Addendum No. 1 Page No. 2
ADDENDUM NO. 6
TO
State Streets Pavement Rehabilitation Project
THIS ADDENDUM shall be considered as part of the contract documents and shall be signed and attached to the volume of proposal documents, which must be submitted with the bid.
The cost of meeting these requirements shall be included in the bid prices for the respective items of work and no additional compensation will be allowed therefore.
The following revisions are to be made to the Contract Documents:
1. Published Road Topo Information:
• 23321-DR-TOPO (DWG)
• 23321-DR-TOPO (TXT)
• 23321-XR-TOPO (DWG)
• BEN-EN - PLOTTER-2012 (CTB)
• Concrete.Cast-In-Place.Exposed Aggregate.Coarse (JPG) • Concrete.Cast-In-Place.Flat.Grey.1 (JPG)
• Sitework.Planting.Grass.Short (JPG)
• Sitework.Planting.Grass.Thick (JPG)
• Sitework.Planting.Gravel.Crushed (JPG)
• Sitework.Planting.Gravel.Mixed (JPG)
• Sitework.Planting.Sand (JPG)
• Sitework.Planting.Sand (JPG)
236
B Street Tower Parklet Project
City Work Order Number: 15053
Addendum No. 1 Page No. 2
ADDENDUM NO. 5
TO
State Streets Pavement Rehabilitation Project
THIS ADDENDUM shall be considered as part of the contract documents and shall be signed and attached to the volume of proposal documents, which must be submitted with the bid.
The cost of meeting these requirements shall be included in the bid prices for the respective items of work and no additional compensation will be allowed therefore.
The following revisions are to be made to the Contract Documents:
1. Revised Question Submission Deadline to July 10, 2024, 5:00pm
2. Revised Question Response Deadline to July 16, 2024, 5:00pm
3. Revised Bid Submission Deadline to July 22, 2024, 3:00 pm ADDENDUM NO. 4
TO
State Streets Pavement Rehabilitation Project
THIS ADDENDUM shall be considered as part of the contract documents and shall be signed and attached to the volume of proposal documents, which must be submitted with the bid.
The cost of meeting these requirements shall be included in the bid prices for the respective items of work and no additional compensation will be allowed therefore.
The following revisions are to be made to the Contract Documents:
1. Published the Bat Survey Memo (PDF)
ADDENDUM NO. 3
TO
State Streets Pavement Rehabilitation Project
THIS ADDENDUM shall be considered as part of the contract documents and shall be signed and attached to the volume of proposal documents, which must be submitted with the bid.
The cost of meeting these requirements shall be included in the bid prices for the respective items of work and no additional compensation will be allowed therefore.
The following revisions are to be made to the Contract Documents:
1. Published the Arborist Report (PDF)
237
B Street Tower Parklet Project
City Work Order Number: 15053
Addendum No. 1 Page No. 2
ADDENDUM NO. 2
TO
State Streets Pavement Rehabilitation Project
THIS ADDENDUM shall be considered as part of the contract documents and shall be signed and attached to the volume of proposal documents, which must be submitted with the bid.
The cost of meeting these requirements shall be included in the bid prices for the respective items of work and no additional compensation will be allowed therefore.
The following revisions are to be made to the Contract Documents:
1. Published the Mitigation Monitoring and Reporting Plan (PDF) ADDENDUM NO. 1
TO
State Streets Pavement Rehabilitation Project
THIS ADDENDUM shall be considered as part of the contract documents and shall be signed and attached to the volume of proposal documents, which must be submitted with the bid.
The cost of meeting these requirements shall be included in the bid prices for the respective items of work and no additional compensation will be allowed therefore.
The following revisions are to be made to the Contract Documents:
1. Revised Pre-Bid Meeting to be mandatory and in person at Circle Park, 1509 Alabama Ave, West Sacramento, CA 95691
238
State Streets Pavement Rehabilitation
Project Street
City Work Order Number: 15042
ADDENDUM NO. 7
July 3, 2024, 2024
__________________________________
Bridget McGinnis, Assistant Engineer
CITY OF WEST SACRAMENTO
CAPIAL PROJECT DEPARTMENT
ENGINEERING DIVISION
1110 West Capitol Avenue, First Floor
West Sacramento, California 95691
239
B Street Tower Parklet Project
City Work Order Number: 15053
Addendum No. 1 Page No. 2
ADDENDUM NO. 7
TO
State Streets Pavement Rehabilitation Project
THIS ADDENDUM shall be considered as part of the contract documents and shall be signed and attached to the volume of proposal documents, which must be submitted with the bid.
The cost of meeting these requirements shall be included in the bid prices for the respective items of work and no additional compensation will be allowed therefore.
The following revisions are to be made to the Contract Documents:
1. Published Pre-Bid Minutes and Agenda (PDF)
2. Published Pre-Bid Sign in (PDF)
3. Published Bid Bond Form (PDF)
4. Published Record Drawings State Streets Sewer Rehabilitation Project (PDF)
5. Published Record Drawings State Streets Water Main Improvement Project (PDF)
6. Revised Working Days to 142. The working days and milestones are shown below:
• Concrete Work, 77 working days, NTP expected 10/01/2024; • HMA and Slurry Seal work, 65 working days, NTP expected 4/01/2025; • 142 Total Working Days.
240
B Street Tower Parklet Project
City Work Order Number: 15053
Addendum No. 1 Page No. 2
ADDENDUM NO. 6
TO
State Streets Pavement Rehabilitation Project
THIS ADDENDUM shall be considered as part of the contract documents and shall be signed and attached to the volume of proposal documents, which must be submitted with the bid.
The cost of meeting these requirements shall be included in the bid prices for the respective items of work and no additional compensation will be allowed therefore.
The following revisions are to be made to the Contract Documents:
1. Published Road Topo Information:
• 23321-DR-TOPO (DWG)
• 23321-DR-TOPO (TXT)
• 23321-XR-TOPO (DWG)
• BEN-EN - PLOTTER-2012 (CTB)
• Concrete.Cast-In-Place.Exposed Aggregate.Coarse (JPG) • Concrete.Cast-In-Place.Flat.Grey.1 (JPG)
• Sitework.Planting.Grass.Short (JPG)
• Sitework.Planting.Grass.Thick (JPG)
• Sitework.Planting.Gravel.Crushed (JPG)
• Sitework.Planting.Gravel.Mixed (JPG)
• Sitework.Planting.Sand (JPG)
• Sitework.Planting.Sand (JPG)
ADDENDUM NO. 5
TO
State Streets Pavement Rehabilitation Project
THIS ADDENDUM shall be considered as part of the contract documents and shall be signed and attached to the volume of proposal documents, which must be submitted with the bid.
The cost of meeting these requirements shall be included in the bid prices for the respective items of work and no additional compensation will be allowed therefore.
The following revisions are to be made to the Contract Documents:
1. Revised Question Submission Deadline to July 10, 2024, 5:00pm
2. Revised Question Response Deadline to July 16, 2024, 5:00pm
3. Revised Bid Submission Deadline to July 22, 2024, 3:00 pm 241
B Street Tower Parklet Project
City Work Order Number: 15053
Addendum No. 1 Page No. 2
ADDENDUM NO. 4
TO
State Streets Pavement Rehabilitation Project
THIS ADDENDUM shall be considered as part of the contract documents and shall be signed and attached to the volume of proposal documents, which must be submitted with the bid.
The cost of meeting these requirements shall be included in the bid prices for the respective items of work and no additional compensation will be allowed therefore.
The following revisions are to be made to the Contract Documents:
1. Published the Bat Survey Memo (PDF)
ADDENDUM NO. 3
TO
State Streets Pavement Rehabilitation Project
THIS ADDENDUM shall be considered as part of the contract documents and shall be signed and attached to the volume of proposal documents, which must be submitted with the bid.
The cost of meeting these requirements shall be included in the bid prices for the respective items of work and no additional compensation will be allowed therefore.
The following revisions are to be made to the Contract Documents:
1. Published the Arborist Report (PDF)
ADDENDUM NO. 2
TO
State Streets Pavement Rehabilitation Project
THIS ADDENDUM shall be considered as part of the contract documents and shall be signed and attached to the volume of proposal documents, which must be submitted with the bid.
The cost of meeting these requirements shall be included in the bid prices for the respective items of work and no additional compensation will be allowed therefore.
The following revisions are to be made to the Contract Documents:
1. Published the Mitigation Monitoring and Reporting Plan (PDF) 242
B Street Tower Parklet Project
City Work Order Number: 15053
Addendum No. 1 Page No. 2
ADDENDUM NO. 1
TO
State Streets Pavement Rehabilitation Project
THIS ADDENDUM shall be considered as part of the contract documents and shall be signed and attached to the volume of proposal documents, which must be submitted with the bid.
The cost of meeting these requirements shall be included in the bid prices for the respective items of work and no additional compensation will be allowed therefore.
The following revisions are to be made to the Contract Documents:
1. Revised Pre-Bid Meeting to be mandatory and in person at Circle Park, 1509 Alabama Ave, West Sacramento, CA 95691
243
State Streets Pavement Rehabilitation
Project Street
City Work Order Number: 15042
ADDENDUM NO. 8
July 16, 2024, 2024
__________________________________
Bridget McGinnis, Assistant Engineer
CITY OF WEST SACRAMENTO
CAPIAL PROJECT DEPARTMENT
ENGINEERING DIVISION
1110 West Capitol Avenue, First Floor
West Sacramento, California 95691
244
B Street Tower Parklet Project
City Work Order Number: 15053
Addendum No. 1 Page No. 2
ADDENDUM NO. 8
TO
State Streets Pavement Rehabilitation Project
THIS ADDENDUM shall be considered as part of the contract documents and shall be signed and attached to the volume of proposal documents, which must be submitted with the bid.
The cost of meeting these requirements shall be included in the bid prices for the respective items of work and no additional compensation will be allowed therefore.
The following revisions are to be made to the Contract Documents:
• HMA Cross Section Example (JPEG)
• Section Plots (PDF)
o Alameda
o 16th
o Vermont
o Virginia
o Alabama
o Delaware
o Circle
o 17th
o Carolina
o Maryland
• PART 5 TECHNICAL SPECIFICATIONS Update 2024.07.16 (PDF) PART 5 TECHNICAL SPECIFICATIONS; Section 8; 8.01 HOT MIX ASPHALT; SPREADING AND COMPACTION EQUIPMENT was changed to say
“After compaction, the asphalt concrete shall have a density of not less than 95 percent of the maximum theoretical unit weight relative compaction of the Laboratory Tested Maximum Density (LTMD), as determined in the field by California Test Method 375 or in a method as approved by the City Engineer.”
245
10+50.00
11+00.00
11+50.00
12+00.00
12+50.00
13+00.00
13+50.00
14+00.00
14+50.00
15+00.00
15+50.00
16+00.00
16+50.00
17+00.00
17+50.00
18+00.00
18+50.00
19+00.00
19+50.00
20+00.00
20+50.00
21+00.00
21+50.00
22+00.00
22+50.00
23+00.00
23+50.00
24+00.00
24+50.00
25+00.00
25+50.00
26+00.00
246
26+50.00
27+00.00
247
10+50.00
11+00.00
11+50.00
12+00.00
12+50.00
248
10+50.00
11+00.00
11+50.00
12+00.00
12+50.00
13+00.00
13+50.00
14+00.00
14+50.00
15+00.00
15+50.00
16+00.00
16+50.00
17+00.00
17+50.00
18+00.00
18+50.00
19+00.00
19+50.00
20+00.00
20+50.00
21+00.00
21+50.00
22+00.00
22+50.00
23+00.00
23+50.00
24+00.00
24+50.00
25+00.00
25+50.00
26+00.00
249
26+50.00
27+00.00
27+50.00
28+00.00
28+50.00
29+00.00
29+50.00
30+00.00
30+50.00
31+00.00
31+50.00
32+00.00
32+50.00
33+00.00
33+50.00
34+00.00
34+50.00
35+00.00
35+50.00
36+00.00
36+50.00
37+00.00
37+50.00
38+00.00
38+50.00
39+00.00
39+50.00
40+00.00
40+50.00
250
0+50.00
1+00.00
1+50.00
2+00.00
2+50.00
3+00.00
3+50.00
4+00.00
4+50.00
5+00.00
251
0+50.00
1+00.00
1+50.00
2+00.00
252
10+50.00
11+00.00
11+50.00
12+00.00
12+50.00
13+00.00
13+50.00
14+00.00
14+50.00
15+00.00
15+50.00
16+00.00
16+50.00
17+00.00
17+50.00
18+00.00
18+50.00
19+00.00
19+50.00
20+00.00
20+50.00
21+00.00
21+50.00
22+00.00
22+50.00
23+00.00
23+50.00
24+00.00
24+50.00
25+00.00
25+50.00
26+00.00
253
26+50.00
27+00.00
27+50.00
254
10+50.00
11+00.00
11+50.00
12+00.00
12+50.00
13+00.00
13+50.00
14+00.00
14+50.00
15+00.00
15+50.00
16+00.00
255
10+50.00
11+00.00
11+50.00
12+00.00
12+50.00
13+00.00
13+50.00
14+00.00
14+50.00
256
10+50.00
11+00.00
11+50.00
12+00.00
12+50.00
13+00.00
13+50.00
14+00.00
14+50.00
15+00.00
15+50.00
16+00.00
16+50.00
17+00.00
17+50.00
18+00.00
18+50.00
19+00.00
19+50.00
20+00.00
20+50.00
21+00.00
21+50.00
22+00.00
257
22+50.00
23+00.00
23+50.00
24+00.00
24+50.00
25+00.00
25+50.00
26+00.00
26+50.00
27+00.00
27+50.00
258
10+50.00
11+00.00
11+50.00
12+00.00
12+50.00
13+00.00
13+50.00
14+50.00
15+00.00
15+50.00
16+00.00
16+50.00
17+00.00
17+50.00
18+00.00
18+50.00
19+00.00
19+50.00
20+00.00
20+50.00
259
10+50.00
11+00.00
11+50.00
12+00.00
12+50.00
13+00.00
13+50.00
14+00.00
14+50.00
15+00.00
15+50.00
16+00.00
16+50.00
17+00.00
17+50.00
18+00.00
18+50.00
19+00.00
19+50.00
20+00.00
20+50.00
21+00.00
21+50.00
22+00.00
22+50.00
23+00.00
23+50.00
24+00.00
24+50.00
25+00.00
25+50.00
26+00.00
260
26+50.00
27+00.00
27+50.00
28+00.00
28+50.00
29+00.00
29+50.00
30+00.00
30+50.00
261
10+50.00
11+00.00
11+50.00
12+00.00
12+50.00
13+00.00
13+50.00
14+00.00
14+50.00
15+00.00
15+50.00
16+00.00
16+50.00
17+00.00
17+50.00
18+00.00
18+50.00
19+00.00
19+50.00
20+00.00
20+50.00
21+00.00
21+50.00
22+00.00
22+50.00
23+00.00
23+50.00
24+00.00
24+50.00
25+00.00
25+50.00
26+00.00
262
26+50.00
27+00.00
27+50.00
28+00.00
28+50.00
29+00.00
29+50.00
30+00.00
30+50.00
31+00.00
31+50.00
32+00.00
32+50.00
33+00.00
33+50.00
34+00.00
34+50.00
35+00.00
35+50.00
36+00.00
36+50.00
37+00.00
37+50.00
38+00.00
38+50.00
39+00.00
39+50.00
40+00.00
40+50.00
41+00.00
41+50.00
42+00.00
263
42+50.00
43+00.00
43+50.00
44+00.00
44+50.00
264
B Street Tower Parklet Project
City Work Order Number: 15053
Addendum No. 1 Page No. 2
ADDENDUM NO. 7
TO
State Streets Pavement Rehabilitation Project
THIS ADDENDUM shall be considered as part of the contract documents and shall be signed and attached to the volume of proposal documents, which must be submitted with the bid.
The cost of meeting these requirements shall be included in the bid prices for the respective items of work and no additional compensation will be allowed therefore.
The following revisions are to be made to the Contract Documents:
1. Published Pre-Bid Minutes and Agenda (PDF)
2. Published Pre-Bid Sign in (PDF)
3. Published Bid Bond Form (PDF)
4. Published Record Drawings State Streets Sewer Rehabilitation Project (PDF)
5. Published Record Drawings State Streets Water Main Improvement Project (PDF)
6. Revised Working Days to 142. The working days and milestones are shown below:
• Concrete Work, 77 working days, NTP expected 10/01/2024; • HMA and Slurry Seal work, 65 working days, NTP expected 4/01/2025; • 142 Total Working Days.
ADDENDUM NO. 6
TO
State Streets Pavement Rehabilitation Project
THIS ADDENDUM shall be considered as part of the contract documents and shall be signed and attached to the volume of proposal documents, which must be submitted with the bid.
The cost of meeting these requirements shall be included in the bid prices for the respective items of work and no additional compensation will be allowed therefore.
The following revisions are to be made to the Contract Documents:
1. Published Road Topo Information:
• 23321-DR-TOPO (DWG)
• 23321-DR-TOPO (TXT)
• 23321-XR-TOPO (DWG)
• BEN-EN - PLOTTER-2012 (CTB)
265
B Street Tower Parklet Project
City Work Order Number: 15053
Addendum No. 1 Page No. 2
• Concrete.Cast-In-Place.Exposed Aggregate.Coarse (JPG) • Concrete.Cast-In-Place.Flat.Grey.1 (JPG)
• Sitework.Planting.Grass.Short (JPG)
• Sitework.Planting.Grass.Thick (JPG)
• Sitework.Planting.Gravel.Crushed (JPG)
• Sitework.Planting.Gravel.Mixed (JPG)
• Sitework.Planting.Sand (JPG)
• Sitework.Planting.Sand (JPG)
ADDENDUM NO. 5
TO
State Streets Pavement Rehabilitation Project
THIS ADDENDUM shall be considered as part of the contract documents and shall be signed and attached to the volume of proposal documents, which must be submitted with the bid.
The cost of meeting these requirements shall be included in the bid prices for the respective items of work and no additional compensation will be allowed therefore.
The following revisions are to be made to the Contract Documents:
1. Revised Question Submission Deadline to July 10, 2024, 5:00pm
2. Revised Question Response Deadline to July 16, 2024, 5:00pm
3. Revised Bid Submission Deadline to July 22, 2024, 3:00 pm ADDENDUM NO. 4
TO
State Streets Pavement Rehabilitation Project
THIS ADDENDUM shall be considered as part of the contract documents and shall be signed and attached to the volume of proposal documents, which must be submitted with the bid.
The cost of meeting these requirements shall be included in the bid prices for the respective items of work and no additional compensation will be allowed therefore.
The following revisions are to be made to the Contract Documents:
1. Published the Bat Survey Memo (PDF)
ADDENDUM NO. 3
TO
State Streets Pavement Rehabilitation Project
266
B Street Tower Parklet Project
City Work Order Number: 15053
Addendum No. 1 Page No. 2
THIS ADDENDUM shall be considered as part of the contract documents and shall be signed and attached to the volume of proposal documents, which must be submitted with the bid.
The cost of meeting these requirements shall be included in the bid prices for the respective items of work and no additional compensation will be allowed therefore.
The following revisions are to be made to the Contract Documents:
1. Published the Arborist Report (PDF)
ADDENDUM NO. 2
TO
State Streets Pavement Rehabilitation Project
THIS ADDENDUM shall be considered as part of the contract documents and shall be signed and attached to the volume of proposal documents, which must be submitted with the bid.
The cost of meeting these requirements shall be included in the bid prices for the respective items of work and no additional compensation will be allowed therefore.
The following revisions are to be made to the Contract Documents:
1. Published the Mitigation Monitoring and Reporting Plan (PDF) ADDENDUM NO. 1
TO
State Streets Pavement Rehabilitation Project
THIS ADDENDUM shall be considered as part of the contract documents and shall be signed and attached to the volume of proposal documents, which must be submitted with the bid.
The cost of meeting these requirements shall be included in the bid prices for the respective items of work and no additional compensation will be allowed therefore.
The following revisions are to be made to the Contract Documents:
1. Revised Pre-Bid Meeting to be mandatory and in person at Circle Park, 1509 Alabama Ave, West Sacramento, CA 95691
267
268
George Reed, Inc.
CPC24-209 State Streets Pavement Rehabilitation
142 Working Days
1795423.1 7203-038
[PROJECT NAME AND PROJECT NUMBER]
PART 2 GENERAL CONDITIONS
269
George Reed, Inc.
CPC24-209 State Streets Pavement Rehabilitation
142 Working Days
Updated 2/17/23
PART 2: GENERAL CONDITIONS
SECTION 1
DEFINITIONS AND TERMS
1.01. GENERAL
Wherever the following abbreviations and terms, or pronouns in place of them, are used in these Conditions and other Contract Documents of which these Conditions are a part, the intent and meaning shall be interpreted as provided below.
1.02. ABBREVIATIONS
The following abbreviations may be used in the Contract Documents:
AA Aluminum Association
AASHTO American Association of State Highway/Transportation Officials ABMA American Boiler Manufacturer’s Association
ACI American Concrete Institute
AFBMA Anti-Friction Bearing Manufacturers Association
AGA American Gas Association
AGC Associated General Contractors
AGMA American Gear Manufacturer’s Association
AI The Asphalt Institute
AIA American Institute of Architects
AIEE American Institute of Electrical Engineers
AISC American Institute of Steel Construction
AISI American Iron and Steel Institute
ANSI American National Standards Institute, Inc.
APA American Plywood Association
API American Petroleum Institute
APWA American Public Works Association
ARA American Railway Association
AREA American Railway Engineering Association
ASCE American Society Civil Engineers
ASHRAE American Society of Heating, Refrigeration and Air Conditioning Engineers
ASME American Society of Mechanical Engineers
ASTM American Society for Testing and Materials
AWG American Wire Gage
AWPA American Wood Preservers’ Association
AWS American Welding Society
AWWA American Water Works Association
BHMA Builders Hardware Manufacturers Association
CCMTC California Concrete Masonry Technical Committee
CRSI Concrete Reinforcement Steel Institute
ETL Electrical Testing Laboratory
FS Federal Specification
ICBO International Conference of Building Officials
IEEE The Institute of Electrical and Electronics Engineers IES Illuminating Engineering Society
IPCEA Insulated Power Cable Engineers Association
270
George Reed, Inc.
CPC24-209 State Streets Pavement Rehabilitation
142 Working Days
Updated 2/17/23
JICS Joint Industry Conference Standards
MBMA Metal Building Manufacturer’s Association
MSS Manufacturers Standardization Society of the Valve and Fitting Industry Standards
NBFU National Board of Fire Underwriters
NBS National Building Standards
NEC National Electrical Code
NEMA National Electrical Manufacturers Association
NFPA National Fire Protection Association
OSHA Occupational Safety and Health Act of 1970
PCA Portland Cement Association
SMACNA Sheet Metal and Air Conditioning Contractor’s National Association SSPC Steel Structures Painting Council
SSPWC Standard Specifications for Public Works Construction UBC Uniform Building Code
UL Underwriter’s Laboratory
UMC Uniform Mechanical Code
UPC Uniform Plumbing Code
USAS The United States of America Standard Institute
USBR United States Bureau of Reclamation
USPHS United States Public Health Service
WCLIB West Coast Lumber Inspection Bureau
WIC Woodwork Institute of California
1.03. DEFINITIONS
The intent and meaning of the following, wherever they appear in the Contract Documents, shall be interpreted as follows:
Acceptance - The formal Acceptance by the Engineer of the entire Contract, which has been completed in all respects in accordance with the Specifications and any, approved modifications.
Addenda - Any written change, clarification or supplement to documents issued for bidding, issued by the City or its Engineer prior to bid.
As Approved - The words “as approved”, unless otherwise qualified, shall be understood to be followed by the words “by the Engineer”.
As Shown, and As Indicated - The words “as shown” and “as indicated” shall be understood to be followed by the words “on the Plans”.
Award - The decision of the City Council to accept the proposal of the lowest responsible Bidder for the Work, subject to the execution and approval of a satisfactory contract therefore and bond to secure the performance thereof and to such other conditions as may be specified or required by law.
Bid - The offer of the Bidder for the Work when made out and submitted on the prescribed Bid form, properly signed and guaranteed. A Bid is also known as a Proposal.
Bid Security - The cash, cashier’s check, certified check, or bidder’s bond accompanying the Bid submitted by the bidder, as a guarantee that the Bidder will enter into a Contract with the City for the performance of Work herein described.
271
George Reed, Inc.
CPC24-209 State Streets Pavement Rehabilitation
142 Working Days
Updated 2/17/23
Bidder - Any individual, firm, partnership or corporation submitting a Bid for the Work contemplated, and acting directly or through a duly authorized representative.
Bureau - United States Bureau of Reclamation.
Calendar Day - Each day shown on the calendar.
Change Order - Written order issued by the Engineer to the Contractor covering changes in the Contract and establishing the bases of compensation and time adjustments for work affected by the changes.
City - The City of West Sacramento, also referred to as the Owner.
City Council or Council - The City Council of the City of West Sacramento.
City Standard Details - The standard details contained in the City Standard Specifications as modified.
City Standard Specifications - 2002 edition of the City of West Sacramento Standard Specifications and Details as amended to date of Bid submittal.
Claim - A separate demand by the Contractor for (i) a time extension, (ii) payment of money or damages arising from work done by or on behalf of the Contractor pursuant to the contract for a public work and payment of which is not otherwise expressly provided for or the claimant is not otherwise entitled to, or (iii) an amount the payment of which is disputed by the City.
Contract - The written agreement covering the performance of the work and the furnishing of labor, materials, tools and equipment in the construction of the Work. The Contract shall include all Contract Documents and supplemental agreements amending or extending the work contemplated which may be required to complete the Work in a substantial and acceptable manner. Supplemental agreements are written agreements covering alterations, amendments, or extensions to the contract and include Addenda and change orders.
Contract Documents - Contract Documents is the collective term for all of the following documents and any other document incorporated therein by reference: Invitation to Bid, Accepted Bid (and all accompanying documents), Designation of Subcontractors, Construction Contract, Payment Bond to Accompany Contract, Performance Bond to Accompany Contract, General Conditions, Supplementary and Special Conditions, (if any), Drawings (and Specifications), Addenda, Change Orders, City of West Sacramento Standard Specifications, State of California Department of Transportation (Caltrans) Standard Specifications 2015, Contractor’s Certification Regarding Workers’ Compensation.
Contractor - The person or persons, firm, partnership or corporation or other entity who has entered into the Contract with the City to perform the Work.
County - County of Yolo, California.
Date of Completion - Date of filing of the Notice of Completion with the Yolo County ClerkRecorder’s Office.
Date of Execution of the Contract - The date on which the Contract is signed by the City’s authorized representative.
272
George Reed, Inc.
CPC24-209 State Streets Pavement Rehabilitation
142 Working Days
Updated 2/17/23
Datum - The Figures given in the Specifications or upon the drawings after the word “Elevation” or an abbreviation of it, shall mean U.S.G.S. datum, unless otherwise noted.
Days - Unless otherwise designated, days as used in the Contract Documents shall mean calendar days.
Elevation - The figures given on the Plans or in the other Contract Documents after the word “elevation” or abbreviation of it shall mean the distance in feet above the standard datum used by the City.
Engineer - The City Engineer, or the person designated by the City as its engineering representative during the course of construction, acting either directly or through properly authorized agents, such agents acting within the scope of the particular duties delegated to them.
Extra Work - Work other than that required either expressly or implied by the Contract in its executed form.
Notice of Completion - notice of completion is the recorded project completion document filed with the Yolo County Clerk.
Or Equal - The term “or equal” shall be understood to indicate that the “equal” product be the equivalent or better than the product named in function, performance, reliability, quality, and general configuration. Determination of equality in reference to the project design requirements will be made by the Engineer.
Plans or Specification Drawings - The term “Plans” or “Specification Drawings” refers to the official plans, profiles, cross sections, elevations, details, and other Working Drawings and supplementary drawings, or reproductions thereof, signed by the Engineer, which show the location, character, dimensions, and details of the work to be performed. Plans may either be bound in the same book as the balance of the Contract Documents or bound in separate sets.
Regardless of the method of binding, Plans shall be part of the Contract Documents.
Plant - All physical, resources, facilities, machinery, equipment, staging, tools, work and storage space other than provided by the Contract, together with subsidiary essentials and necessary maintenance for proper construction and acceptable completion of the project.
Project - The entire Work to be completed under the Contract.
Project Manager - The person designated by the City as its project management representative during the course of construction, acting either directly or through properly authorized agents, such agents acting within the scope of the particular duties delegated to them. The Project Manager will be the City Engineer unless the City designates a separate Project Manager.
When a Project Manager is used for a project, the Project Manager has full authority to act as the City Engineer unless the designation specifically states otherwise.
Shop Drawings - Drawings prepared by the fabricator or supplier showing the layout and details of components fabricated in a shop for inclusion in the permanent facility (e.g., structural steel, reinforcing steel, railings).
Site - The area upon or in which the Contractor’s operations are carried on and such other areas adjacent thereto as may be designated by the Engineer. 273
George Reed, Inc.
CPC24-209 State Streets Pavement Rehabilitation
142 Working Days
Updated 2/17/23
Specifications - The term “specifications” refers to the terms, provisions, and requirements contained herein. Where reference specifications, such as those of “ASTM”, “AASHTO”, etc. have been referred to, the applicable portions of such standard specifications shall become a part of these Contract Documents.
State - State of California.
State Standard Specifications - Standard Specifications issued by the State of California Department of Transportation, dated 2015, and as amended Bid in the supplemental conditions.
Subcontractor - The term “Subcontractor”, as employed herein, includes only those having a direct contract with the Contractor and it includes one who furnishes material worked to a special design according to the plans or specifications of this work, but does not include one who merely furnishes material not so worked and would be considered a supplier only.
Supplementary & Special Conditions Provisions - Additions, revisions, special directions, and requirements peculiar to a project and not otherwise thoroughly set forth in General and/or Specifications.
Time Limits - All time limits stated in the Contract Documents are of the essence of the Contract.
Work - All the work specified, indicated, shown or contemplated in the Contract Documents to construct the improvements, including all alterations, amendments or extensions thereto made by Change Order or other written orders of the Engineer.
Working Days - A Working day is defined as any day, except Saturdays, Sundays and legal holidays of the City.
Working Drawings - Drawings furnished by the Contractor showing the layout and details of temporary construction procedures and methods of construction, and data for construction equipment which are to be employed in the construction of the permanent facility (e.g., form drawings, erection drawings, load test pile procedures, pile hammer data, etc.).
Written Notice - “Written Notice” shall be deemed to have been duly served when delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended, or if delivered at or sent by certified U.S. mail to the last business address known to the party who gives the notice as specified in the Contract.
Whenever in the Specifications or upon the drawings the words “directed”, “required”, “permitted”, “ordered”, “designated”, “prescribed”, or words of like import are used, it shall be understood that the direction, requirement, permission, order, designation or prescription of the Engineer is intended, and similarly the words “approved”, “acceptable”, “satisfactory”, or words of like import, shall mean approved or acceptable to, or satisfactory to the Engineer, unless otherwise expressly stated.
274
George Reed, Inc.
CPC24-209 State Streets Pavement Rehabilitation
142 Working Days
Updated 2/17/23
SECTION 2
SCOPE OF WORK
2.01. INTENT OF CONTRACT DOCUMENTS
The intent of the Contract Documents is to prescribe the details for the construction and completion of the Work, which the Contractor undertakes to perform in accordance with the terms of the Contract. These General Conditions are meant to replace Division I of the State Standard Specifications for all City public works contracts which incorporate these General Conditions by reference.
Where the Specifications and Plans describe portions of the Work in general terms, but not in complete detail, it is understood that only the best general practice is to prevail and that only materials and workmanship of the first quality are to be used. Unless otherwise specified, the Contractor shall furnish all labor, materials, tools, equipment and incidentals and do all the Work involved in performing the Contract in a satisfactory and workmanlike manner.
The technical provisions are presented in sections for convenience. However, this presentation does not necessarily delineate trades or limits of responsibility. All sections of the Specifications and Plans are interdependent and applicable to the Project as a whole.
The Contract Documents are complementary, and what is called for in any one shall be as binding as if called for in all. Anything shown on the Drawings and not mentioned in the Specifications or mentioned in the Specifications and not shown on the Drawings shall have the same effect as if shown or mentioned respectively in both. Any work shown on one Drawing shall be construed to be shown in all Drawings and the Contractor will coordinate the Work and the Drawings.
If any portion of the Contract Documents shall be in conflict with any other portion, the various documents comprising the Contract Documents shall govern in the following order of precedence: Change Orders; Addenda; Shop Drawings, Drawings, Supplementary and Special Conditions; Designation of Subcontractors; Construction Contract; General Conditions; City of West Sacramento Standard Specifications; State of California Department of Transportation (Caltrans) Standard Specifications 2015.
Detail Drawings take precedence over General Drawings. As between schedules and other information given on Drawings, the Schedules shall govern. If an item is shown on any Drawing and not specifically included in Technical Specifications specific to this project, the Drawing shall govern. Any conflict or inconsistency between or in the drawings shall be submitted to the Engineer for clarification as soon as the Contractor becomes aware of such inconsistency.
2.02. CONTRACTOR’S UNDERSTANDING
It is understood and agreed that the Contractor has, by careful examination, satisfied itself as to the nature and location of the Work, the conformation of the ground, the character, quality and quantity of the materials to be encountered, the character of equipment and facilities needed preliminary to and during the prosecution of the Work, the general and local conditions, and all other matters which can in any way affect the Work under this Contract. No verbal agreement or conversation with any officer, agent or employee of the City, either before or after the execution of this Contract, shall affect or modify any of the terms or obligations contained herein.
275
George Reed, Inc.
CPC24-209 State Streets Pavement Rehabilitation
142 Working Days
Updated 2/17/23
2.03. CHANGES IN THE WORK
(a) The City may, at any time, by written order, make changes in the Work as deemed necessary by the Engineer. Such changes include, but are not limited to:
(1) In the Specifications or Plans;
(2) In the sequence, method or manner of performance of the Work; (3) In the owner-furnished facilities, equipment, materials, services or site; and (4) Directing acceleration of the Work.
(b) If such changes cause an increase or decrease in the Contractor’s cost of, or time required for, performance of the Contract, an equitable adjustment will be made and the Contract modified in writing accordingly.
(1) Change Orders
A change pursuant to this section will be in the form of a Change Order, which will set forth the work to be done or the method by which the change and cost adjustment, if any, will be determined, and the time of completion of the work.
Upon receipt of a Change Order, the Contractor shall proceed with the ordered work. If ordered in writing by the Engineer, the Contractor shall proceed with the work so ordered prior to actual receipt of a Change Order. A Change Order executed by the Contractor and approved by the Engineer is an executed Change Order as that term is used throughout this section.
(2) Change Order Protests
A Change Order may be issued to the Contractor at any time. Should the Contractor disagree with any terms or conditions set forth in a Change Order, which he has not executed, he shall submit a written protest to the Engineer within fifteen (15) days after the receipt of such Change Order. The protest shall state the points of disagreement and, if possible, the quantities and cost involved.
If a written protest is not submitted, payment will be made as set forth in the Change Order. Such payment shall constitute full compensation for all work included therein or required thereby. Such unprotested Change Orders shall be considered as executed Change Orders.
Where the protest concerning a Change Order relates to compensation, the compensation payable for all work specified or required by said Change Order to which such protest relates will be determined in the same manner as provided in Section 2.04 of this section. The Contractor shall keep full and complete records of the cost of such work and shall permit the Engineer to have such access thereto as may be necessary to assist in the determination of the compensation payable for such work. Where the protest concerning a Change Order relates to the adjustment of time and for completion of the Work, the time to be allowed therefor will be determined as provided in this section.
The consent of the Contractor’s sureties shall not be required as to any change or Extra Work, and the liability of the Contractor’s Bonds shall be increased or decreased accordingly without notice to the sureties.
276
George Reed, Inc.
CPC24-209 State Streets Pavement Rehabilitation
142 Working Days
Updated 2/17/23
2.04. PROCEDURES AND ALLOWABLE COSTS ON CHANGES AND ADDITIONS TO WORK
(a) Forms of Payment
If the change in, or addition to, the Work will result in an increase in the contract sum, the City shall have the right to require the performance thereof. The compensation to be paid for any such work shall, in the City’s sole discretion, be determined in one or more of the following ways:
(1) By extension of agreed unit prices, if unit prices are required by the City’s Bid form and provided with Contractor ‘s bid;
(2) By revision of unit prices;
(3) By proposal and Acceptance of an agreed upon lump sum; and (4) On a force account basis.
Until one of the above methods is agreed on, or if the Work is to be paid for on a time and materials basis, the Contractor shall keep full and complete records of the cost of such work in the form and manner prescribed by the Engineer and shall permit the Engineer to have access to such records as may be necessary to assist in the determination of the compensation payable for such work.
(b) Lump Sum Payment
The City, in its sole and absolute discretion, may request a lump sum proposal by Contractor to perform the change in, or addition to, the Work performed. Such lump sum proposal shall be submitted by the Contractor within ten (10) days of the City’s request therefor.
Request for a lump sum proposal by City shall not be deemed an election by City to have the Work performed on a lump sum basis. Costs of preparing the proposal shall not be compensable.
(1) Contents of Lump Sum Proposal
(2) The Contractor’s proposal shall be itemized and segregated by labor and materials for the various components of the change (no aggregate labor total will be acceptable). The proposal shall be accompanied by signed proposals of any Subcontractors, which will perform any portion of the change, and of any persons who will furnish materials or equipment for incorporation therein. The proposal shall also include the Contractor’s estimate of the time required to perform said changes or additional work. (3) Computation of Labor Costs
The portion of the proposal relating to labor, whether by the Contractor’s forces or the forces of any of its Subcontractors, may include the projected wages of the reasonably anticipated Site labor, including foremen, who will be directly involved in the change in the Work.
These projected wages shall not include charges for assistant superintendents, superintendents, office personnel, timekeepers and maintenance mechanics.
Labor costs may also include Contractor’s overhead and profit which shall be computed by adding to the labor costs either up to fifteen percent (15%) of the projected wages, but not payroll costs, or the labor surcharge set forth in the California Department of 277
George Reed, Inc.
CPC24-209 State Streets Pavement Rehabilitation
142 Working Days
Updated 2/17/23
Transportation publication entitled Labor Surcharge And Equipment Rental Rates, which is in effect on the date upon which the Work is accomplished and which is a part of the Contract. The method of computing the overhead and profit shall be solely within the discretion of the City.
The labor surcharge, if used, shall constitute full compensation for all payments imposed by State and Federal laws and for all other payments made to, or on behalf of, the workmen, other than actual wages as defined above. No time or charges will be allowed except when the workers are actually engaged in the proper, efficient and diligent performance or completion of the extra work as authorized. Overtime shall not be worked without prior approval of the Engineer.
(4) Computation of Equipment and Materials Costs
The portion of the proposal relating to materials may include the reasonably anticipated direct costs to the Contractor or to any of its Subcontractors of materials to be purchased for incorporation in the change in the Work. This portion of the proposal may also include transportation and applicable sales or use taxes. Up to fifteen percent (15%) of these direct costs may be included as overhead and profit for the Contractor or any such Subcontractor (such overhead and profit to include all small tools).
This portion of the proposal may further include the Contractor’s and any of its Subcontractors’ reasonably anticipated costs for the rental and operation of prime construction and automotive equipment furnished and used in connection with the change in the Work. The equipment rental and operation rates used shall be the latest edition of the Department of Transportation, Division of Construction, Equipment Rental Rates. These costs shall not include charges for listed equipment or major tools with a new cost of five hundred dollars ($500.00) or less. No time charges shall be allowed except for equipment actually used for the proper and efficient performance or completion of the authorized change in the Work. (5) Subcontractors
The lump sum proposal may include up to five percent (5%) of the amount, which the Contractor will pay to any of its Subcontractors for the change in the Work as allowable overhead and profit to the Contractor.
(6) Failure to Submit Lump Sum Proposal
In the event that the Contractor fails to submit its proposal within the designated period, the Engineer may direct the Contractor to proceed with the change or addition to the Work and the Contractor shall so proceed. The Engineer shall unilaterally determine the reasonable costs and time to perform the work in question, which determination shall be final and binding upon the Contractor.
(7) Failure to Agree on Lump Sum Amount
In the event that the parties are unable to agree as to the reasonable costs and time to perform the change in or addition to the Work based upon the Contractor’s proposal and the Engineer and City do not elect to have the change in the Work performed on a time and material basis, the Engineer and City shall make a unilateral determination of the reasonable cost and time to perform the change in the Work, based upon their own estimates, the Contractor’s submission or combination thereof. In such instances, a Change Order shall be issued for the amount of costs and time determined by the Engineer and the City and shall become binding upon the Contractor unless the Contractor submits its protest in writing to the 278
George Reed, Inc.
CPC24-209 State Streets Pavement Rehabilitation
142 Working Days
Updated 2/17/23
City within thirty (30) days of the issuance of the Change Order. The City has the right to direct the Contractor in writing to perform the change in the Work, which is the subject of the Change Order. Failure of the parties to reach agreement regarding the costs and time of performing the change in the Work and/or any pending protest shall not relieve the Contractor from performing the change in the Work promptly and expeditiously.
(c) Payment by Unit Prices
If any of the items included in the lump sum proposal are covered by unit prices contained in the contract document, the City may, if it requires the change in the Work to be performed on a lump sum basis, elect to use these unit prices in lieu of the similar items included in the lump sum proposal in which event an appropriate deduction will be made in the lump sum amount prior to the application of any allowed overhead and profit percentages. No overhead and profit shall be applied to any unit prices. (d) Payment on a Force Account Basis
If the City elects to have the change or addition to the Work performed on a force account basis, the Work shall be performed, whether by the Contractor’s forces or the forces of any of its Subcontractors or Sub-Subcontractors, and payment shall be made subject to the following provision. The Contractor will be paid the direct costs of the labor, equipment and materials used in performing the force account work determined as hereinafter provided. (1) For labor, the Contractor will be paid the cost of labor for the workers (including foremen when authorized by the Engineer or Project Manager) used in the actual and direct performance of the work. The cost of labor, whether the employer is the Contractor or any or any Subcontractor of any tier, shall be actual wages, including basic hourly wage, health and welfare payments and pension payments incurred in performing the force account work, plus any travel and subsistence payments for the workers performing such work and made necessary thereby. To the actual wages shall be added a labor surcharge as set forth in the State Department of Transportation publication entitled “Labor Surcharge and Equipment Rental Rates”, as in effect on the date the work is performed. The labor surcharge shall be deemed to encompass the City’s entire liability to reimburse the Contractor for workers compensation insurance payments, social security payments, Medicare payments, federal unemployment insurance payments, state unemployment insurance payments and state training taxes, made necessary by the force account work.
(2) For equipment, the Contractor will be paid for the use of equipment at the rental rates listed for that equipment in the State Department of Transportation publication entitled “Labor Surcharge and Equipment Rental Rates”, which is in effect on the date the work is performed, regardless of ownership or any rental agreement entered into by Contractor for such equipment. The rental rate paid in accord with said publication shall be deemed to include the cost of fuel, oil, lubrication, supplies, small tools, attachments, repairs and maintenance, depreciation, storage and insurance for said equipment. Rental time will not be paid when equipment is inoperable due to breakdowns, repairs or maintenance. Payment for loading, transporting and unloading time will be in accordance with the State Standard Specifications applicable to loading, transporting and unloading equipment for force account work, as applicable as of the date the equipment is loaded, transported or unloaded. (3) For materials used in the work, the City will pay for materials furnished by the Contractor and necessarily used in the force account work. Prior to markups as set forth below, the amount paid shall be the price paid by the actual purchaser to the actual supplier plus any necessary actual costs of handling the materials. 279
George Reed, Inc.
CPC24-209 State Streets Pavement Rehabilitation
142 Working Days
Updated 2/17/23
Contractor may add fifteen percent (15%) to the total labor, equipment and material charges as the total overhead and profit to the entity or entities actually performing the force account work. If the entity or entities actually performing the work are Subcontractors or Sub-Subcontractors, the Contractor shall be allowed five percent (5%) of the total charge of the performing entity or entities (including mark- up) as Contractor’s mark-up. No other mark-ups shall be allowed hereunder.
The Contractor shall submit to the City daily work and material tickets, to include the identification number assigned to the change in the Work, the location and description of the change in the Work, the classification of labor employed (and names and social security numbers), hours expended, the material used, the equipment rented (not tools) and such other evidence of cost as the City may require. The City may require authentication of all time and material tickets and invoices by persons designated by the City for such purpose. The failure of the Contractor to secure any required authentication shall, if the City elects to treat it as such, constitute a waiver by the Contractor of any claim for the cost of that portion of the Change in the Work covered by a non-authenticated ticket or invoice; provided, however, that the authentication of any such ticket or invoice by the City shall not constitute an acknowledgment by the City that the items thereon were reasonably required for the Change in the Work. (e) Limitations on Changes
The Contractor shall not be entitled to any amount for indirect costs, damages or expenses of any nature, including, but not limited to, so-called “impact” costs, labor inefficiency, wage, material or other escalations beyond the prices upon which the proposal is based and to which the parties have agreed pursuant to the provisions of this section, and which the Contractor, its Subcontractors and Sub-Subcontractors or any other person may incur as a result of delays, interferences, suspensions, changes in sequence or the like, for whatever cause, whether reasonable or unreasonable, foreseeable or unforeseeable, or avoidable or unavoidable, arising from the performance of any and all changes in the work performed pursuant to this section. It is understood and agreed that the Contractor’s sole and exclusive remedy in such event shall be recovery of its direct costs as compensable hereunder and an extension of the time of the Contract, but only in accordance with the provisions of the Contract Documents.
It is expressly agreed that Contractor shall not be entitled to claim damages for anticipated profits on any portion of the Work that may be deleted.
The amount of any adjustment for work deleted shall be estimated at the time deletion of work is ordered and the estimated adjustment will be deducted for the subsequent monthly pay estimates. The City reserves its rights under Section 3.20 to audit Contractor’s as-Bid profit in connection with any deductive change, to arrive at a final adjustment. Contractor’s as-Bid profit shall be reduced pro rata according to the proportion of the original contract value less as-Bid profit, represented by the work deleted.
The City reserves the right to contract with any person or firm other than the Contractor for any or all Extra Work.
2.05. UNILATERAL CHANGE IN OR ADDITION TO THE WORK
Notwithstanding the above, the City, directly or through the Engineer, may direct the Contractor in writing to perform changes in or additions to the scope of the Contract. The Contractor shall perform such work and the parties shall proceed pursuant to the provisions of Section 2.04.
280
George Reed, Inc.
CPC24-209 State Streets Pavement Rehabilitation
142 Working Days
Updated 2/17/23
2.06. DIFFERING SITE CONDITIONS
The Contractor shall promptly, and before the following conditions are disturbed, notify the City in writing of any:
(a) Material that the Contractor believes may be material that is hazardous waste, as defined in Section 25110.02 of the Health and Safety Code, that is required to be removed to a Class I, Class II, or Class III disposal site in accordance with provisions of existing law; or (b) Subsurface or latent physical conditions at the Site differing from those indicated in the Contract Documents; or
(c) Unknown conditions at the Site of any unusual nature, different materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contract.
The Engineer shall thereupon promptly investigate the conditions. If the Engineer finds that they do involve hazardous waste, or do materially differ and cause an decrease or increase in the Contractor’s cost or time of performance, the Engineer will issue a change order as appropriate. Any increase or decrease of cost resulting from such changes shall be adjusted in the manner provided in Section 2.04 for adjustments as to extra and/or additional work and changes. In the event that a dispute arises between the City and the Contractor, whether the conditions materially differ, or involve hazardous waste, or cause and decrease or increase the Contractor’s cost of, or time required for, performance of any part of the Work, the Contractor shall not be excused from any scheduled completion date provided by the Contract, but shall proceed with all work to be performed under the Contract, the procedures applicable to claims for extra costs shall then apply.
2.07. CLAIMS FOR EXTRA COSTS
(a) Notice of Potential Claims
(1) It is hereby mutually agreed that the Contractor shall not be entitled to the payment of any additional compensation for any cause, including any act, or failure to act, by the Engineer, or the happening of any event, thing or occurrence, unless the Contractor provides the Engineer with written notice of the potential claims as hereinafter specified.
Compliance with this section, however, shall not be a prerequisite as to matters within the scope of the protest provisions in Section 2.03.
The written notice of potential claims shall set forth the reasons for which the Contractor believes additional compensation will or may be due, the nature of the costs involved, and, insofar as possible, the amount of the potential claim. The notice as above required shall be given to the Engineer prior to the time that the Contractor commences performance of the Work giving rise to the potential claim for additional compensation, if based on an act or failure to act by the Engineer, or in all other cases within ten (10) days after the happening of the event, thing or occurrence giving rise to the potential claim. (b) Construction Dispute
(1) The Contractor may submit a dispute to the Engineer concerning any matter for which a protest under Section 2.03, or a notice of potential claim, is filed. Such disputes, or potential claims, shall be submitted to the Engineer within sixty (60) days following the submission of said protest or notice, unless, due to the nature of the dispute or the uncompleted state of the Work, it is impracticable to determine the amount or the extent of the 281
George Reed, Inc.
CPC24-209 State Streets Pavement Rehabilitation
142 Working Days
Updated 2/17/23
claim within such period. In such cases, disputes shall be submitted at the earliest practicable time in which such a determination can be made. In any event, all disputes shall be filed on or before the date of the final release by the Contractor as provided for in Section 7.09. (2) All disputes shall be in writing and shall set forth clearly and in detail, for each item of additional compensation requested, the reasons for the dispute, reference to applicable provisions of the Specifications, the nature and the amount of the cost involved, the computations used in determining such costs, all pertinent factual data and all the documents necessary to substantiate the dispute. The Contractor shall maintain complete and accurate records of the cost or any portion of the Work for which additional compensation is claimed, and shall provide the Engineer with copies thereof, as required. The Engineer shall provide a written decision to the dispute or potential claim as soon as practicable but not later than 30 days following receipt thereof.
(c) Resolution of Construction Claims
(1) To the extent that the Contractor disputes the Engineer’s Written Decision issued pursuant to Section 4.07(b)(2), or to the extent the Engineer fails to issue a timely written decision, the Contractor may file a written claim, as defined by Public Contract Code section 9204(c)(1), with the City including reasonable documentation to support the claim. Upon receipt of the claim, the City shall conduct a reasonable review of the claim, and within a period not to exceed 45 days, the City shall provide the Contractor with a written statement identifying what portion of the claim is disputed and what portion is undisputed. The time in which the City must provide a written statement may be extended by mutual agreement of the parties as specified by Public Contract Code section 9204(d)(1)(C). The City shall pay any undisputed portion of the claim within 60 days after issuance of its written statement. (2) Claims submitted by the Contractor shall be accompanied by a notarized certificate containing the following language:
Under the penalty of law for perjury or falsification and with specific reference to the California False Claims Act, Government Code section 12650, et. seq., the undersigned, (Name)
(Title
(Company
hereby certifies that the claim for the additional compensation and time, if any, made herein for the work on this contract is a true statement of the actual costs incurred and time sought, and is fully documented and supported under the contract between parties.
Dated:
/s/
Subscribed and sworn before me this _____ day
of
282
George Reed, Inc.
CPC24-209 State Streets Pavement Rehabilitation
142 Working Days
Updated 2/17/23
Notary Public
My commission expires
Failure to submit the notarized certificate will be sufficient cause for denying the claim.
Any claim for overhead type expenses or costs, in addition to being certified as stated above, shall be supported by an audit report of any independent Certified Public Accountant. Any such overhead claim shall also be subject to audit by the City at its discretion.
Any costs or expenses incurred by the City in reviewing or auditing any claims that are not supported by the Contractor’s cost accounting or other records shall be deemed to be damages incurred by the City within the meaning of the California False Claims Act. (3) Meet And Confer Regarding Unresolved Claims. If the Contractor disputes the City’s written statement issued pursuant to Section 4.07(c)(1) or if the City fails to issue a timely written response, the Contractor may demand in writing an informal conference to meet and confer for settlement of the issues in dispute. Upon receipt of a demand in writing sent by registered mail or certified mail, return receipt requested, the City shall schedule a meet and confer conference within 30 days for settlement of the dispute. The meet and confer conference shall be attended by senior executives of the parties who have authority to settle the controversy. Within 10 business days following the conclusion of the meet and confer conference, the City shall provide the Contractor with a written statement identifying the portion of the claim that remains in dispute and the portion that is undisputed. The City shall pay any undisputed portion of the claim within 60 days after it issues its written statement. (4) Mediation. If the Contractor disputes, in writing, any portion of the City’s written statement as issued under Section 4.07(c)(3), the disputed items shall be submitted to nonbinding mediation according to the provisions of Public Contract Code section 9204(d)(2), and any costs of mediation shall be allocated as set forth in that section. Upon receipt of a claim, the City and the Contractor may agree to waive, in writing, mediation. (5) Failure to Respond or Pay. If the City fails to timely respond to a claim from the Contractor or otherwise fails to meet the time requirements of Public Contract Code section 9204, the claim shall be deemed rejected in its entirety. Additionally, amounts not timely paid in the manner required by Public Contract Code section 9204 shall bear interest at 7 percent per annum.
(6) Subcontractor Claims. If a Subcontractor or a lower tier Subcontractor lacks legal standing to assert a claim against the City because privity of contract does not exist, the Contractor may present to the City a claim on behalf of the Subcontractor or lower tier Subcontractor pursuant to Public Contract Code section 9204(d)(5).
2.08. CIVIL ACTION PROCEDURES
(a) Alternative Dispute Resolution of Claims of $375,000.00 or Less. (1) Claims Less Than $375,000.00. Notwithstanding any other provision herein but after compliance with the provisions of Public Contract Code section 9204 as set forth in Section 4.07, claims of $375,000.00 or less shall be resolved pursuant to the alternative dispute resolution procedures set forth in Public Contract Code section 20104 et seq. “Claim” 283
George Reed, Inc.
CPC24-209 State Streets Pavement Rehabilitation
142 Working Days
Updated 2/17/23
for this purpose means a separate demand by the Contractor for a time extension, payment of money or damages arising from work done by or on behalf of the Contractor pursuant to the Contract, for which payment is expressly provided, or the Contractor is otherwise entitled to, or an amount the payment of which is disputed by the City. (2) Submission of Claims Less than $375,000.00. The Contractor shall submit its claim of $375,000.00 or less to the City in writing, within the time frames established under paragraph 4.07, but no later than before the final payment is made. The City shall respond within the time provided by statute. If the Contractor disagrees with the response or the City fails to respond within the time permitted, the Contractor shall notify the City of the disagreement in writing within fifteen (15) days from the date of the response or expiration of the time permitted to respond and demand a meet-and-confer conference. The City shall schedule a meet-and-confer conference within thirty (30) days of the demand. The meet and confer conference shall be attended by senior executives of the parties who have authority to settle the controversy. If not resolved at the meet-and-confer conference, the Contractor may initiate a civil action as set forth in Public Contract Code section 20104 et seq., including but not limited to compliance with applicable Government Code provisions.
(3) Time Limits Not Extended. Nothing in subdivision (a) of Public Contract Code section 20104.2 shall extend the time limit or supersede the notice requirements provided in this Contract for filing claims by the Contractor.
(b) Alternative Dispute Resolution of Claims in Excess of $375,000.00.
As a condition precedent to the initiation of litigation, disputes in excess of a total value of $375,000.00 shall first be submitted to the claims procedures set forth in Sections 4.06 and
4.07. 2.09. GUARANTEE
(a) In addition to warranties, representations and guarantees stated elsewhere in the Contract Documents, the Contractor unconditionally guarantees all materials and workmanship furnished hereunder, and agrees to replace the same at its sole cost and expense, and to the satisfaction of the Engineer, any and all materials which may be defective or improperly installed.
(b) The Contractor shall repair or replace to the satisfaction of the Engineer any or all such work that may prove defective in workmanship or materials, ordinary wear and tear excepted, together with any other work, which may be damaged or displaced in so doing. (c) In the event of failure to comply with the above stated conditions within a reasonable time, the City is authorized to have the defect repaired and made good at the expense of the Contractor who will pay the costs and charges therefore immediately upon demand, including any reasonable management and administrative costs, and engineering, legal and other consultant fees incurred to enforce this section. (d) The signing of the Contract by the Contractor shall constitute execution of the above guarantees. Except as otherwise provided in this Contract, the guarantees and warranties shall remain in effect for a period of one (1) year after final Acceptance of the Work by the City.
284
George Reed, Inc.
CPC24-209 State Streets Pavement Rehabilitation
142 Working Days
Updated 2/17/23
SECTION 3
CONTROL OF WORK
3.01. AUTHORITY OF ENGINEER
(a) The Engineer is the representative of the City and has full authority to interpret the Contract Documents, to conduct the construction review and inspection of the Contractor’s performance, and to decide questions, which arise during the course of the Work and the Engineer’s decisions on these matters, shall be final and conclusive. The Engineer has the authority to reject all work and materials, which do not conform to the Contract Documents, and has the authority to stop the Work whenever such stoppage may be necessary to insure the proper execution of the Contract. The Engineer’s failure to stop the Work shall not obligate the City to accept defective or otherwise unacceptable work or otherwise affect the Engineer’s or City’s authority to reject work for any reason set forth in the Contract Documents. (b) If at any time the Contractor’s work force, tools, plant or equipment appear to the Engineer to be insufficient or inappropriate to secure the required quality of work or the proper rate of progress, the Engineer may order the Contractor to increase their efficiency, improve their character, to augment their number or to substitute other personnel, new or additional tools, plant or equipment, as the case may be, and the Contractor shall comply with such order.
Neither the failure of the Engineer to demand such increase of efficiency, number, or improvement, nor the compliance by the Contractor with the demand, shall relieve the Contractor of its obligation to provide quality work at the rate of progress necessary to complete the Work within the specified time.
(c) The Engineer may authorize minor variations in the work from the requirements of the Contract Documents which do not involve an adjustment in the Contract Price or the Contract Time. These may be accomplished by a Field Order. Contractor shall comply promptly with all Field Orders. If the Engineer and Contractor are unable to agree on entitlement or on the amount or extent, if any, of any adjustment in the Contract Price or Contract time, or cost, as a result of a Field Order, a claim may be made therefor pursuant to Section 2.07. (d) Any order given by the Engineer, not otherwise required by the Contract Documents to be in writing shall, on request of the Contractor, be given or confirmed by the Engineer in writing.
(e) Whenever work, methods of procedure, or any other matters are made subject to direction or approval, such direction or approval will be given by the Engineer.
3.02. DRAWINGS
(a) Drawings furnished herewith are for bidding purposes. The Engineer will furnish the Contractor, free of charge, copies of full size Drawings which are reasonably necessary for the execution of the Work. The Contractor shall have no claim for excusable delay on account of the failure of the Engineer to deliver such Drawings, unless the Engineer shall have failed to deliver the same within two weeks after receipt of written demand therefore from the Contractor.
The Contractor shall keep one copy of said Drawings, in good order, available to the Engineer and the Engineer’s representatives, and convenient to the working site. (b) If the Contractor, in the course of the Work, finds any discrepancy between the Drawings and the physical condition of the locality, or any errors or omissions in the Drawings, 285
George Reed, Inc.
CPC24-209 State Streets Pavement Rehabilitation
142 Working Days
Updated 2/17/23
or in the layout as given by points and instructions, it shall be the Contractor’s duty to inform the Engineer in writing, and the Engineer will promptly verify the same.
Any work done after such discovery, until authorized, will be done at the Contractor’s risk. All Drawings, Specifications, and copies thereof furnished by the Engineer are the property of the Engineer and shall not be reused on other work and, with the exception of the signed Contract sets, are to be returned to the Engineer, on request, at the completion of the Work. All models are the property of the City.
(c) The Drawings shall be supplemented by such Shop Drawings prepared by the fabricator and/or supplier and Working Drawings prepared by the Contractor as are necessary to adequately control the Work. No changes shall be made by the Contractor in any Shop or Working Drawings after they have been reviewed by the Engineer, if the Engineer deems that no further submittals are necessary. The Contractor shall not commence the layout, purchase, fabrication, or construction of any work for which Shop or Working Drawings are required until Engineer has reviewed the specifications and drawings and has indicated in writing no further submittals are required for compliance with the Contract Documents. (d) Shop and Working Drawings for any structure shall include, but not be limited to, detail design calculations, fabrication and installation drawings, lists, graphs, operating instructions, etc., which shall be reviewed and accepted by the Engineer before any such work is performed.
(e) Shop and Working Drawings will be required for cribs, cofferdams, falsework, centering and form work and for other temporary work and methods of construction the Contractor proposes to use. Such Drawings shall be subject to the review and Acceptance of the Engineer insofar as the details affect the character of the finished work, but details of design will be left to the Contractor who shall be responsible for the successful construction of the Work.
(f) Contractor agrees that Shop and/or Working Drawings processed by the Engineer are not Change Orders; that the purpose of these Drawings submitted by the Contractor is to demonstrate to the Engineer that the Contractor understands the design concept, that the Contractor demonstrates its understanding by indicating which equipment and material the Contractor intends to furnish and by detailing the fabrication methods it intends to use. It is expressly understood, however, that favorable review of the Contractor’s Shop and Working Drawings shall not relieve the Contractor of any responsibility for accuracy of dimensions and details, or for mutual agreements of dimensions and details. It is mutually agreed that the Contractor shall be responsible for agreement and conformity of its Drawings with the Specifications. Contractor further agrees that if deviations, discrepancies or conflicts between Shop and/or Working Drawings and Specifications are discovered either prior to or after the Drawings are processed by the Engineer, the Specifications shall control and shall be followed.
(g) Unless otherwise stated, the Engineer shall have thirty (30) days from the date of receipt of Shop and/or Working Drawings for review.
(h) Full compensation for furnishing all Shop and/or Working Drawings shall be considered as included in the prices paid for the Contract items of work to which such drawings relate and no additional compensation will be allowed therefore. Any cost related to the Engineer’s review of any particular set of Shop and/or Working Drawings more than twice, due to incompleteness or unacceptability, shall be borne by the Contractor, and the City reserves the right to withhold such costs from payments due the Contractor. 286
George Reed, Inc.
CPC24-209 State Streets Pavement Rehabilitation
142 Working Days
Updated 2/17/23
(i) All reasonable effort has been made to locate and delineate all known structures and facilities on the plans. Except as otherwise provided herein, the City of West Sacramento shall assume no responsibility for the completeness or accuracy of its delineation of underground utilities nor the existence of other buried objects which may be encountered, or which are not shown on the plans.
(j) The Contractor shall keep and maintain a clean set of plans for the project and shall record in red ink all changes, revisions, etc. made during the course of construction. These plans shall include all changes, revisions, etc. from the original plan complete with the exact sizes, locations, dimensions, elevations, etc. These plans shall be kept and maintained in a neat, clean and legible condition and shall be available for inspection at all times by the Engineer. The Contractor shall deliver these completed plans to the Engineer and the Engineer shall approve these plans prior to final Acceptance of the project by the City.
3.03. CONSTRUCTION STAKING AND SURVEYS
The City will provide one set of construction stakes and benchmarks as it deems necessary to establish lines and grades required for the completion of the site work specified in the Contract. The Contractor shall notify the Engineer a minimum of seven (7) days in advance of the time work is to begin on any portion of the project that may require construction staking to be provided by the City. The Contractor shall make all other surveys necessary for the completion of the Work.
Alternatively, the Engineer may provide the Contractor with drawings showing benchmarks and reference points as it deems necessary to establish lines and grades required for the completion of the site work specified in the Contract Documents. The Contractor shall make or furnish all surveys and set all construction stakes necessary for the completion of the work.
Stakes and marks set by the City or Engineer shall be carefully preserved by the Contractor. The Contractor shall be charged for the cost of replacing or restoring the stakes and marks, which are destroyed or damaged by Contractor’s operation. This charge will be deducted from any monies due or to become due to the Contractor under the Contract.
3.04. PERMITS AND REGULATIONS
Permits and licenses, of a temporary nature, necessary for the prosecution of the Work shall be secured and paid for by the Contractor. Permits, licenses and easements for permanent structures or permanent changes in existing facilities shall be secured and paid for by the City unless otherwise specified.
The Contractor shall give all notices and comply with all laws, ordinances, rules and regulations bearing on the conduct of the Work as shown on the plans and described in the Specifications. Contractor shall promptly notify the Engineer in writing of any specification at variance therewith. In such instances, any necessary changes shall be adjusted as provided in the Contract for changes in the Work. If the Contractor performs any Work knowing it to be contrary to such laws, ordinances, rules, and regulations and without such notice to the Engineer, Contractor shall bear all costs arising therefrom.
3.05. CONFORMITY WITH CONTRACT DOCUMENTS AND ALLOWABLE DEVIATIONS Work and materials shall conform to the lines, grades, cross sections, dimensions and material requirements, including tolerances, shown on Contract Documents. Although 287
George Reed, Inc.
CPC24-209 State Streets Pavement Rehabilitation
142 Working Days
Updated 2/17/23
measurement, sampling, and testing may be considered evidence as to such conformity, the Engineer shall be the sole judge as to whether the Work or materials deviate from the Contract Documents. The Engineer’s decision as to any allowable deviations therefrom shall be final and conclusive.
3.06. COORDINATION AND INTERPRETATION OF CONTRACT DOCUMENTS (a) Should it appear that the Work to be done or any of the matters relative thereto are not sufficiently detailed or explained in the Specifications and Plans, the Contractor shall apply to the Engineer for such further explanations as may be necessary and shall conform to them as part of the Contract. In the event of any doubt or question arising respecting the true meaning of the Specifications and Plans, reference shall be made to the Engineer, whose decision thereon shall be final and conclusive.
(b) Any reference made in the Specifications and Plans to any specification, standard, method, or publication of any scientific or technical society or other organization shall, in the absence of a specific designation to the contrary, be understood to refer to the specification, standard, method, or publication in effect as of the date that the Work is advertised for Bids.
3.07. SUBCONTRACTORS
(a) The attention of the Contractor is directed to the provisions of California Public Contract Code sections 4100-4113 regarding subcontracting and said provisions are by this reference incorporated herein and made a part hereof.
(b) Each subcontract shall contain a suitable provision for the suspension or termination thereof should the Work be suspended or terminated or should the Subcontractor neglect or fail to conform to every provision of the Contract Documents insofar as such provisions are relevant. The Contractor shall be fully responsible to the City for the acts or omissions of the Contractor’s Subcontractors and of the persons either directly or indirectly employed by the Contractor. Nothing contained in the Contract Documents shall create any contractual relationship between any Subcontractor and the City. If a legal action, including arbitration and litigation, against the City is initiated by a Subcontractor or Supplier, the Contractor shall reimburse the City for the amount of legal, engineering and all other expenses incurred by the City in defending itself in said action. (c) The City and the Engineer reserve the right to approve all Subcontractors.
Such approval shall be a consideration to the awarding of the Contract and unless notification to the contrary is given to the Contractor prior to the signing of the Contract, the list of Subcontractors which is submitted with the Contractor’s proposal will be deemed to be acceptable. Contractor shall not, without the written consent of the City, subcontract the whole of the Work.
3.08. COOPERATION OF CONTRACTORS
(a) Should construction be under way by other forces or by other contractors within or adjacent to the limits of the Work specified or should work of any other nature be under way by other forces within or adjacent to said limits, the Contractor shall cooperate with all such other contractors or other forces to the end that any delay or hindrance to their work will be avoided. The right is reserve d to perform other or additional work at or near the site (including material sources) at any time, by the use of other forces. 288
George Reed, Inc.
CPC24-209 State Streets Pavement Rehabilitation
142 Working Days
Updated 2/17/23
(b) When two or more contractors are employed on related or adjacent work, each shall conduct its operation in such a manner as not to cause any unnecessary delay or hindrance to the other. Each Contractor shall be responsible to the other for all damage to work, to persons or property caused to the other by its operations, and for loss caused the other due to unnecessary delays or failure to finish the work within the time specified for completion.
3.09. SUPERINTENDENCE
(a) The Contractor shall designate in writing, before starting work, an individual as authorized representative who shall have the authority to represent and act for the Contractor.
This authorized representative shall be present at the Site of the Work at all times while work is actually in progress on the Contract. When the Work is not in progress and during periods when the Work is suspended, arrangements acceptable to the Engineer shall be made for any emergency work, which may be required.
(b) The Contractor is solely responsible, at all times, for the superintendence of the Work and for its safety and progress.
(c) Whenever the Contractor or its authorized representative is not present on any particular part of the Work where it may be desired to give direction, orders will be given by the Engineer, which shall be received and obeyed by the superintendent or foreman who may have charge of the particular work in reference to which the orders are given. (d) Any order given by the Engineer, not otherwise required by the Specifications to be in writing, will on request of the Contractor, be given or confirmed by the Engineer in writing.
3.10. INSPECTION OF WORK
(a) Unless otherwise provided, all equipment, materials, and work shall be subject to inspection and testing by the Engineer. The Engineer will observe the progress and quality of the Work and determine, in general, if the Work is proceeding in accordance with the intent of the Contract Documents. The Engineer shall not be required to make comprehensive or continuous inspections to check the quality of the Work. The Engineer shall not be responsible for construction means, methods, techniques, sequences, or procedures, or for safety precautions and programs in connection with the Work. Visits and observations made by the Engineer shall not relieve the Contractor of Contractor’s obligation to conduct comprehensive inspections of the Work and to furnish proper materials, labor, equipment and tools, and perform acceptable work, and to provide adequate safety precautions, in conformance with the intent of the Contract.
(b) Whenever the Contractor varies the period during which work is carried on each day, the Contractor shall give due notice to the Engineer so that proper inspection may be provided. Any work done in the absence of the Engineer shall be subject to rejection. Proper facilities for safe access for inspection to all parts of the Work shall at all times be maintained for the necessary use of the Engineer and other agents of the City, and agents of the federal, state, or local governments at all reasonable hours for inspection by such agencies to ascertain compliance with laws and regulations.
(c) One or more inspectors may be assigned to observe the Work by the Engineer and to act in matters of construction under this Contract. It is understood that inspectors shall have the power to issue instructions and make decisions within the limitations of the authority of the Engineer. Such inspection shall not relieve the Contractor of the Contractor’s obligation to conduct comprehensive inspections of the Work, to furnish proper materials, labor, equipment 289
George Reed, Inc.
CPC24-209 State Streets Pavement Rehabilitation
142 Working Days
Updated 2/17/23
and tools, and perform acceptable work, and to provide adequate safety precautions in conformance with the intent of the Contract.
(d) The Engineer and the Engineer’s representatives shall at all times have access to the Work wherever it is in preparation or progress, and the Contractor shall provide safe and convenient facilities for such access and for inspection. If the Specifications, the Engineer’s instructions, laws, ordinances, or any public authority require any material, equipment or work to be specifically tested or approved, the Contractor shall give the Engineer timely notice of its readiness for inspection, and if the inspection is by an authority other than the City, of the time fixed for inspection. Inspections by the Engineer will be made promptly and, where practicable, at the source of supply.
(e) Work performed without inspection may be required to be removed and replaced under proper inspection. In such instances, the entire cost of removal and replacing, including the cost of City-furnished materials used in the Work, shall be borne by the Contractor, regardless of whether or not the Work exposed is found to be defective. Examination of questioned work, other than that installed without inspection, may be ordered by the Engineer and, if so ordered, the Work must be uncovered by the Contractor. If such work is found to be in accordance with the Contract Documents, the City will pay the cost of re-examination and replacement. If such work is found to be not in accordance with the Contract Documents, the Contractor shall pay such cost, unless the Contractor can show that the defect in the Work was caused by another Contractor , and in that event the City will pay such costs. (f) The inspection of the Work shall not relieve the Contractor of the Contractor’s obligation to fulfill the Contract as herein prescribed, or in any way alter the standard of performance provided by the Contractor, and defective work shall be made good and unusable materials may be rejected, notwithstanding that such work and materials have been previously overlooked by the Engineer and accepted or estimated for payment. If the Work or any part thereof shall be found defective, the Contractor shall, within ten (10) calendar days, make good such defect in a manner satisfactory to the Engineer. If the Contractor fails to make ordered repairs of defective work or to remove the condemned materials from the Work within ten (10) calendar days after written direction by the Engineer, the City may make the ordered repairs, or remove the condemned materials, and deduct the cost thereof from any monies due the Contractor.
(g) The Contractor shall furnish promptly, without additional charge, all facilities, labor and materials reasonably needed by the Engineer for performing all inspection and tests.
Contractor shall be charged with any additional cost of inspection when material and workmanship are not ready at the time specified by the Contractor for its inspection. (h) Where any part of the Work is being done under an encroachment permit or building permit, or is subject to federal, state, county or city codes, laws, ordinances, rules or regulations, representatives of the government agency shall have full access to the Work and shall be allowed to make any inspection or tests in accordance with such permits, codes, laws, ordinances, rules, or regulations. If advance notice of the readiness of the Work for inspection by the governing agency is required, the Contractor shall furnish such notice to the appropriate agency.
(i) The Engineer may inspect the production of material, or the manufacture of products at the source of supply. Plant inspection, however, will not be undertaken until the Engineer is assured of the cooperation and assistance of both the Contractor and the material producer. The Engineer or the Engineer’s authorized representative shall have free entry at all times to such parts of the plant as concerns the manufacture or production of the materials. 290
George Reed, Inc.
CPC24-209 State Streets Pavement Rehabilitation
142 Working Days
Updated 2/17/23
Adequate facilities shall be furnished free of charge to make the necessary inspection. The City assumes no obligation to inspect materials at the source of supply.
3.11. TESTS
The Contractor shall perform, at the Contractor’s own expense, all tests specified or required by the Specifications. The Engineer may perform such tests as the Engineer deems necessary to determine the quality of work or compliance with Contract Documents. The Contractor shall furnish promptly without additional charge all facilities, labor, and material reasonably required for performing safe and convenient tests as may be required by the Engineer. All tests by the Engineer will be performed in such a manner as will not unnecessarily delay the Work. The Contractor shall not be required to reimburse the City for tests performed by the City or Engineer. If samples of materials are submitted which fail to pass the specified tests, the Contractor shall pay for all subsequent tests.
3.12. REMOVAL OF REJECTED AND UNAUTHORIZED WORK AND MATERIALS (a) All work or materials, which have been rejected, shall be remedied, or removed and replaced by the Contractor in an acceptable manner and no compensation shall be allowed the Contractor for such removal, replacement, or remedial work. (b) Any work done beyond the lines and grades shown on the plans or established by the Engineer or any Extra Work done without written authority will be considered as unauthorized work and will not be paid for. Upon order of the Engineer, unauthorized work shall be remedied, removed, or replaced at the Contractor’s expense. (c) Upon failure of the Contractor to comply with any order of the Engineer made under this section, the City may cause rejected or unauthorized work to be remedied, removed, or replaced, and may deduct the costs therefore from any monies due or to become due the Contractor.
3.13. DEDUCTIONS FOR UNCORRECTED WORK
If the Engineer deems it inexpedient to correct work damaged or not done in accordance with the Contract, an equitable deduction from the Contract price shall be made therefore, and such sum may be withheld by the City from Contractor’s payment.
3.14. EQUIPMENT AND PLANTS
(a) Only equipment and plants suitable to produce the quality of work and materials required will be permitted to operate on the Project.
(b) Plants will be designed and constructed in accordance with general practice for such equipment and shall be of sufficient capacity to insure the production of sufficient material to carry the Work to completion within the time limit.
(c) The Contractor shall provide adequate and suitable equipment and plants to meet the above requirements, and when ordered by the Engineer, shall remove unsuitable equipment from the Work and discontinue the operation of unsatisfactory plants. Contractor shall, upon request of the Engineer, submit one or more lists identifying, by make, model number, Contractor ‘s identification number and empty gross weight, each piece of operable equipment used for the Work. Contractor shall, upon request of the Engineer, submit documentation establishing that any measuring device used for the Work has been tested and properly approved under California Test 109.
291
George Reed, Inc.
CPC24-209 State Streets Pavement Rehabilitation
142 Working Days
Updated 2/17/23
(d) In the case of termination of this Contract before its completion for any cause whatsoever, the Contractor, if notified to do so by the City, shall promptly remove any part or all of its equipment and supplies from the property of the City. If the Contractor fails to do so, the City shall have the right to remove such equipment and supplies at the expense of the Contractor.
3.15. CHARACTER OF WORKER
If any Subcontractor, or person employed by the Contractor or any Subcontractor fails or refuses to carry out the directions of the Engineer or appears to the Engineer to be incompetent or to act in a disorderly or improper manner, said person shall be removed from the Project immediately on the requisition of the Engineer. That person shall not again be employed on the Work. Such discharge shall not be the basis for any claim for compensation or damages against the City, or any of its officers or agents.
3.16. SEPARATE CONTRACTS
(a) The City reserves the right to let other contracts in connection with this Work.
The Contractor shall afford other contractors reasonable opportunity for the introduction and storage of their materials and the execution of their work, and shall properly connect and coordinate Contractor’s work with the other Contractor ‘s work. (b) If any part of the Contractor’s work depends on proper execution or results upon the Work of any other Contractor , the Contractor shall inspect and promptly report to the Engineer any defects in such work that render it unsuitable for such proper execution and results. The Contractor’s failure to inspect and report shall constitute an Acceptance of the other Contractor ‘s work as fit and proper for the reception of the Contractor’s work, except as to defects which may develop in the other Contractor ‘s work after the execution of the Contractor’s work.
(c) To insure the proper execution of Contractor’s subsequent work, the Contractor shall measure work already in place and shall at once report to the Engineer any discrepancy between the executed work and the Drawings.
3.17. ASSIGNMENT
The Contractor shall not assign the Contract or sublet it as a whole or in part without the written consent of the City, nor shall the Contractor assign any monies due, or to become due to the Contractor hereafter without the prior written consent of the City.
3.18. USE OF COMPLETED PORTIONS, RIGHT TO OPERATE UNSATISFACTORY
EQUIPMENT OR FACILITIES
(a) The City may, at any time, and from time to time, during the performance of the Work, enter the Work Site for the purpose of installing any necessary work by City labor or other contracts, and for other purpose in connection with the installation of facilities. In doing so, the City shall endeavor not to interfere with the Contractor and the Contractor shall not interfere with other work being done by or on behalf of the City.
(b) If, prior to completion and final Acceptance of all the Work, the City takes possession of any structure or facility (whether completed or otherwise) comprising a portion of the Work with the intent to retain possession thereof (as distinguished from temporary possession contemplating the return to the Contractor), then, while the City is in possession of the same, the Contractor shall be relieved of liability for loss or damage to such structure other 292
George Reed, Inc.
CPC24-209 State Streets Pavement Rehabilitation
142 Working Days
Updated 2/17/23
than that resulting from the Contractor’s fault or negligence. Such taking of possession by the City shall not relieve the Contractor from any provisions of this Contract regarding such structure, other than to the extent specified in the preceding sentence, nor shall such taking constitute a final Acceptance of such structure or facility. (c) If, following installation of any equipment or facilities furnished by the Contractor, defects requiring correction by the Contractor are found, the City shall have the right to operate such unsatisfactory equipment or facilities and make reasonable use thereof until the equipment or facilities can be shut down for correction of defects without injury to the City.
3.19. LANDS FOR WORK, RIGHT-OF-WAY CONSTRUCTION ROADS
(a) The City will provide the lands, easements, right-of-way, and/or encroachment permits necessary or other rights to enter and work on lands necessary for the performance of the Work. Other permits and licenses are addressed by Section 3.04. Should the Contractor find it advantageous to use any additional land for any purpose whatever, the Contractor shall provide for the use of such land at its expense. The Engineer shall be furnished with a copy of written agreements or otherwise be notified in writing of additional working space which is acquired. Nothing herein contained and nothing marked on the Plans shall be interpreted as giving the Contractor exclusive occupancy of the territory provided by the City. When two or more contracts are being executed at one time on the same or adjacent land in such a manner that work on one contract may interfere with that on another, the Engineer shall decide which Contractor shall cease work, and which shall continue, or whether the work on both contracts shall progress at the same time and in what manner, and the decision of the Engineer shall be final and binding. When the territory of one contract is the necessary or convenient means of access for the performance of another contract, such privilege of access or any other reasonable privilege may be granted by the Engineer to the Contractor so desiring, to the extent, amount, in the manner, and at the time permitted. No such decision as to the method or time of conducting the Work or the use of territory shall be the basis of any claim for delay or damage.
(b) Lands, easements or rights-of-way to be furnished by the City for construction operations will be specifically shown on the Plans.
(c) The Contractor shall construct and maintain all roads necessary to reach the various parts of the Work and for the transportation thereto of construction material and personnel. The cost of constructing and maintaining such roads shall be borne by the Contractor.
3.20. CITY’S RIGHT TO AUDIT AND PRESERVATION OF RECORDS (a) The Contractor shall maintain books, records and accounts of all costs in accordance with generally accepted accounting principles and practices. The City and its authorized representatives shall have the right to audit the books, records and accounts of the Contractor under any of the following conditions:
(1) The Contract is terminated for any reason in accordance with the provisions of the Contract Documents in order to arrive at equitable termination costs; (2) In the event of a disagreement between the Contractor and the City over the amount due the Contractor under the terms of the Contract; 293
George Reed, Inc.
CPC24-209 State Streets Pavement Rehabilitation
142 Working Days
Updated 2/17/23
(3) To check or substantiate any amounts invoiced or paid which are required to reflect the costs of the Contractor, or the Contractor’s efficiency or effectiveness under this Contract or in connection with extras, changes, claims, additions, backcharges, or others, as may be provided for in this Contract;
(4) If it becomes necessary to determine the City’s rights and the Contractor’s obligations under the Contract or to ascertain facts relative to any claim against the Contractor which may result in a charge against the City; (5) To determine any difference in cost occasioned by a permissible substitution;
(6) And/or for any other reason in the City’s sole judgment. (b) Contractor shall provide the City (or its representatives), unlimited, reasonable access during working hours to the Contractor’s books and records. The City’s audit rights shall be liberally construed in the City’s favor.
(c) The Contractor, from the effective date of final payment or termination hereunder, shall preserve and make available to the City for a period of three (3) years thereafter, at all reasonable times at the office of the Contractor (but without any charge to the City), all its books, records, documents, photographs, micro-photographs, and other evidence bearing on the costs and expenses of the Contractor under this Contract and relating to the Work hereunder.
(d) The City will make all payments required of it under this Contract subject to audit, under circumstances stated above, which audit may be performed at the City’s option, either during the Contract time period or during the record retention time period. Regardless of authorization, approval or acceptance, signatures or letters which are given by the City and are part of the City’s control systems or are requested by the Contractor, the payments made under this Contract shall not constitute a waiver or agreement by the City that it accepts as correct the billings, invoices or other charges on which the payments are based. If the City’s audit produces a claim against the Contractor, the City may pursue all its legal remedies even though it has made all or part of the payments required by this Contract. (e) If any audit by the City or its representative discloses an underpayment by the City pursuant to the terms of the Contract Documents, the City shall have the duty to pay any amount found by the audit to be owed to the Contractor. If such audit discloses an overpayment, the Contractor shall have the obligation to reimburse the City for the amount of the overpayment. The City’s right to claim reimbursement from the Contractor of any overpayment shall not be terminated or waived until three years after the completion of the City’s audit or upon the termination of audit rights under subparagraph 3.20(f), whichever date is later. The obligation of the Contractor to make reimbursements hereunder shall not terminate except as provided by law.
(f) The City’s right to audit and the preservation of records shall terminate at the end of three (3) years after the date final payment is made or termination of the Contract. The Contractor shall include this “Right to Audit and Preservation of Records” clause in all subcontracts issued by it and it shall require the same to be inserted by all lower tier Subcontractors in their subcontracts, for any portion of the work. Should Contractor fail to include this clause in any such contract or lower tier contract, or otherwise fail to insure the City’s rights hereunder, Contractor shall be liable to the City for all costs, expenses and attorney’s fees which the City may have to incur obtaining or attempting to obtain an audit or 294
George Reed, Inc.
CPC24-209 State Streets Pavement Rehabilitation
142 Working Days
Updated 2/17/23
inspection of or the restoration of records which otherwise would have been available to the City from said persons under this clause. Such audit may be conducted by the City or its authorized representative.
295
George Reed, Inc.
CPC24-209 State Streets Pavement Rehabilitation
142 Working Days
Updated 2/17/23
SECTION 4
CONTROL OF MATERIALS
4.01. MATERIALS
(a) Unless otherwise specifically stated in the Specifications, the Contractor shall furnish all materials necessary for the execution and completion of the Work. Unless otherwise specified, all materials shall be new and shall be manufactured, handled, and installed in a workmanlike manner to insure completion of the Work in accordance with the Contract Documents. The Contractor shall, upon request of the Engineer, furnish satisfactory evidence as to the kind and quality of materials.
(b) Where materials are to be furnished by the City, the type, size, quantity and location at which they are available will be stated in the Contract Documents. (c) Manufacturers’ warranties, guarantees, instruction sheets and parts listed, which are furnished with certain articles or materials incorporated in the Work, shall be delivered to the Engineer before Acceptance of the Contract.
4.02. STORAGE OF MATERIALS
Articles or materials to be incorporated in the Work shall be stored in such a manner as to insure the preservation of their quality and fitness for the Work, and to facilitate inspection.
4.03. TRADE NAMES AND ALTERNATIVES
Whenever a material, article, system or sub-system is specified or described by using the name and/or model of a proprietary product or trademark or the name of the manufacturer or vendor, the specified item shall establish the type, function, and quality required. It shall be understood that the words “or approved equivalent” are implied whether or not they follow the proprietary enumeration.
The City reserves the right to determine when proprietary items have no equivalency, and when uniformity of operations, interchangeability of parts, standard parts inventory, etc., are in the City’s best interest.
Requests for review of equivalency will be considered upon submission of sufficient information as described herein, to allow complete review. Such requests shall not be accepted from anyone other than the Contractor. Such submission must be made prior to purchase, fabrication, manufacture or use of the equivalent items under consideration. (a) Contractor’s Risk. If the Contractor includes in its Bid or later proposes any material, product or equipment that the Contractor considers equivalent to that specified, the Contractor assumes all risk of any sort associated with Acceptance or rejection of proposed equivalent items. The Contractor shall have no right to make claim based upon Contractor’s Bid that includes a proposed equivalent item(s) of work which resulted in a lower Bid amount for said item(s) or lower total bid.
(b) Submission Requirements. Each submission for equivalency review shall include:
296
Updated 2/17/23
(1) Justification for use of the proposed equivalent item(s), including evidence, as applicable, that Contract specified material, product or equipment is unobtainable or unobtainable within an acceptable time for contract completion; (2) A description of the difference between specified item(s) and proposed equivalent item(s) and the comparative advantages and disadvantages of each; (3) All relevant data addressing each specified parameter to show equivalency;
(4) A prediction of any effects the proposed change will have on operation and maintenance costs where applicable.
(c) Equivalency. An item will be considered equivalent to the item specified if it is equal to or better in:
(1) Design and strength in all sub-parts, quality, reliability and durability, operation, maintenance and serviceability, as applicable; and (2) Specified parameters in performance in all respects for the specific function(s) indicated in the contract.
(d) Supplemental Requirements. Any tests required by the City to establish quality and performance standards shall be promptly conducted by or through the Contractor at no additional cost to the City. In addition, the Contractor shall:
(1) Submit any additional data requested by the Engineer for the equivalency review; and
(2) Satisfactorily accomplish all changes, including any Engineering associated with use of equivalent items, at no additional cost to the City. (e) Equivalency Determinations. The Engineer shall be the sole judge as to equivalency determinations. The Engineer’s decision shall be final. The Contractor shall have no right of appeal to any decision rejecting the equivalency of any item. (f) Procedure.
(1) Data substantiating a request for a substitution of “an equal” item shall be submitted prior to the Award of the Contract pursuant to Section 3400 of the latest edition of the Public Contract Code.
(2) After the Bid opening, the apparent three low bidders shall have seven (7) calendar days to provide complete substantiating data for all product, material or system substitution requests. After this seven (7)-day period, the City may award the Contract to the apparent low bidder. In no event will product, material or system substitution requests submitted after the Award of Contract be considered. Failure to submit such substantiating data will result in the automatic rejection of the proposed substitution request. The City will have thirty (30) days to review the first ten (10) proposed substitution requests. For each additional five (5) product, material or system substitution requests over and above the initial ten (10), the City will have ten (10) additional days to review the proposed substitution requests. (3) Each substitution request may include one alternate substitution. All alternate substitutions shall be submitted concurrently with substitution requests. Upon review 297
Updated 2/17/23
by the City, proposed substitutions shall be returned to the Bidder marked either “accepted” or “rejected”. The City shall only review alternative substitution requests if the primary substitution request is rejected. If a substitution request, and its alternative, is returned “rejected”, no further substitution requests for that product, material or system will be allowed and the Bidder will provide the specified product, material or system.
(4) If, after all substitution requests have been processed, substitution requests by the apparent low Bidder are rejected by the City, the apparent low Bidder may elect not to execute the Contract. Under no circumstances, will bidders be allowed to alter their Bid Price as originally submitted. This election shall be made in writing no later than five (5) days following the receipt of the reviewed substitution requests. An election by the Bidder not to execute the Contract will result in the forfeiture of the bidder’s Bid bond. If the apparent low Bidder elects not to continue, and the second low Bidder is awarded the Contract, the second low Bidder may then elect not to execute the Contract for the contract price shown on its Bid Form. Subsequent bidders shall have five (5) days following the receipt of the reviewed substitution requests and the Notice of Award in which to make their election. This process shall continue until one Bidder decides to continue with the Award of Contract process. (5) The City may award the Contract at any time after the time for submitting substitution requests expires pursuant to subpart (2), above. In the event the Contract is awarded prior to acceptance/rejection of substitution requests, all outstanding substitution requests shall be reviewed by the City as provided above. If the apparent low Bidder elects not to execute the Contract, the Award of Contract to the apparent low Bidder shall be rescinded and the Contract awarded to the next apparent low bidder. All bidders electing not to execute the Contract expressly agree that the City shall incur no liability for such rescissions. As provided herein, “apparent low bidder” means the lowest responsive and responsible bidder.
4.04. CERTIFICATES OF COMPLIANCE
(a) A Certificate of Compliance shall be furnished prior to the use of any materials for which the Technical Specifications require that such a certificate be furnished. In addition, when so authorized in the Specifications, the Engineer may permit the use of certain materials or assemblies prior to sampling and testing if accompanied by a Certificate of Compliance. The Certificate of Compliance shall be signed by the manufacturer of the material or the manufacturer of assembled materials and shall state that the materials involved comply in all respects with the requirements of the Contract. A Certificate of Compliance shall be furnished with each lot of material delivered to the Work and the lot so certified shall be clearly identified in the Certificate.
(b) All materials used on the basis of a Certificate of Compliance may be sampled and tested at any time. The fact that material is used on the basis of a Certificate of Compliance shall not relieve the Contractor of responsibility for incorporating material in the Work which conforms to the requirements of the Contract Documents and any such material not conforming to such requirements will be subject to rejection whether in place or not. (c) The City reserves the right to refuse to permit the use of material on the basis of a Certificate of Compliance.
(d) The form of the Certificate of Compliance and its disposition shall be as directed by the Engineer.
298
Updated 2/17/23
SECTION 5
LEGAL RELATIONS AND RESPONSIBILITY
5.01. COMPLIANCE WITH LAWS – PERMITS, REGULATIONS, TAXES The Contractor is an independent Contractor and shall, at the Contractor’s sole cost and expense, comply with all laws, rules, ordinances and regulations of all governing bodies having jurisdiction over the Work, obtain all necessary permits and licenses therefore, pay all manufacturers’ taxes, sales taxes, use taxes, processing taxes, and all federal and state taxes, insurance and contributions for social security and unemployment which are measured by wages, salaries or any remuneration paid to Contractor’s employees, whether levied under existing or subsequently enacted laws, rules or regulations. The Contractor shall also pay all property tax assessments on materials or equipment used until Acceptance by the City. If any discrepancy or inconsistency is discovered in the Plans or Specifications, or in this Contract in relation to any such law, rule, ordinance, regulation, order or decree, the Contractor shall forthwith report the same to the Engineer in writing. The Contractor shall also protect, defend and indemnify the City, the Engineer, and all of the City’s officers, agents, and servants against any claim or liability arising from or based upon the violation of any such law, rule, ordinance, regulation, order or decree, whether by the Contractor or its employees. Particular attention is called to the following:
(a) Without limitation, materials furnished and performance by Contractor hereunder shall comply with Safety Orders of the Division of Industrial Safety, State of California, Federal Safety regulations of the Bureau of Labor, Department of Labor; and any other applicable Federal regulations.
(b) The Contractor, upon request shall furnish evidence satisfactory to the City and Engineer that any or all of the foregoing obligations have been or are being fulfilled. The Contractor warrants to the City that it is licensed by all applicable governmental bodies to perform this Contract and will remain so licensed throughout the progress of the Work, and that Contractor has, and will have, throughout the progress of the Work, the necessary experience, skill and financial resources to enable the Contractor to perform this Contract. (c) Contractor is required to insure that material safety data sheets (MSDSs) for any material requiring a material safety data sheet pursuant to any federal or state law are available in a readily accessible place on the Project premises. Contractor is also required to insure:
(1) The proper labeling of any substance brought onto the Project premise by Contractor or any Subcontractors and
(2) That the person(s) working with the material, or within the general area of the material, are appropriately informed about the hazards of the substance and follow proper handling and protection procedures.
(d) Contractor is required to comply with the provisions of California Health and Safety Code section 25249.5, et seq. (Prop. 65), which requires the posting and giving of notice to persons who may be exposed to any chemical known to the State of California to cause cancer.
299
Updated 2/17/23
5.02. PREVAILING WAGE
(a) The Contractor shall forfeit as penalty to the City the amount specified by law for each calendar day or portion thereof for each worker (whether employed by the Contractor or any Subcontractor) paid less than the stipulated prevailing rates for any work done under the Contract in violation of the provisions of the Labor Code and in particular, Section 1775 which is incorporated herein by reference. Copies of the current schedules for prevailing wages are on file in the City’s office, and the contents of those schedules are included herein as if set forth in full.
(b) The City will not recognize any claims for additional compensation because of the payment of the wages set forth in these General Conditions. The possibility of wage increases is one of the elements to be considered by the Contractor in determining its proposal, and will not under any circumstances, other than delays caused by the City, the Engineer, or the City’s agents, be considered as the basis of a claim against the City. (c) The Contractor agrees to follow the instructions of the City’s labor compliance officer until notified otherwise in writing by the City. (d) The Director of the Department of Industrial Relations of the State of California has determined the general prevailing rate of wages of per diem wages in the locality in which the work is to be performed for each craft or type of worker needed to execute the Contract.
Copies of the applicable prevailing wage rate determinations are made available to the Contractor and Subcontractor at the Pre-Job Conference Meeting. The Contractor shall post a copy of this document at the prevailing wages at each job site, along with a CMU work place poster, printed on 8 1/2” X 11” paper or larger, in accordance with California Code of Regulations, Title 8, section 16451(d).
5.03. PREVAILING WAGE RECORDS
(a) The Work is subject to monitoring and enforcement of prevailing wage requirements by the Department of Industrial Relations (“DIR”) and the following provisions will apply:
(1) Contractor and Subcontractors shall maintain and furnish to the DIR, a certified copy of each weekly payroll (but no less often than monthly), with a statement of compliance signed under penalty of perjury. Such certified payroll reports in PDF form shall be transmitted electronically to the DIR after first registering at http://www.dir.ca.gov/PublicWorks/Certified-Payroll-Reporting.html. The provisions of Labor Code section 1776 are incorporated herein by reference.
(2) The CITY and the DIR shall review, including by way of job site inspections, and, if appropriate, audit payroll records to verify compliance with the public works requirements of the Labor Code. The DIR will notify the Contractor or Subcontractor(s), as appropriate) of any noncompliance, in order for all such Contractor or Subcontractor(s) to correct the noncompliance.
(3) The City shall withhold payments when payroll records are delinquent or inadequate.
(4) The City shall withhold payments equal to the amount of underpayment and applicable penalties when, after investigation, it is established that underpayment has occurred.
300
Updated 2/17/23
(5) The City shall cooperate with the DIR and DLSE in any investigation of suspected violations of prevailing wage requirements.
(6) As directed by the Labor Commissioner, the City shall withhold Contract payments equal to the payments due or estimated to be due to the Contractor or Subcontractors whose payroll records are delinquent or inadequate, plus any additional amount that the Labor Commissioner has reasonable cause to believe may be needed to cover a back wage and penalty assessment against such Contractor or Subcontractors. The Contractor shall be required to withhold payments to a Subcontractor whose payroll records are delinquent or inadequate until the Labor Commissioner provides notice that the Subcontractor has cured such delinquency or deficiency.
(7) These payroll records shall be made available to the City’s representatives. These records shall be maintained during the course of the Work. The Contractor and all Subcontractors shall make the certified payroll records available for inspection by City representatives upon request and shall permit such representatives to interview employees during the work hours on the job site. (8) The Contractor shall be held entirely responsible for the prompt resolution of all non-compliances with the prevailing wage laws, including those pertaining to all Subcontractors and any lower tier Subcontractors.
(9) The Project will not be accepted as complete by the City nor final payment made until all items of non-compliance are corrected or until appropriate provision is made by depository agreement to assure the ultimate resolution and payment of any back wages that may be found due.
(b) A pre-construction conference shall be conducted before commencement of the Work with the Contractor and Subcontractors at which time the prevailing wage requirements will be reviewed and agreed to by all parties.
5.04. LABOR DISCRIMINATION
Attention is directed to Section 1735 of the Labor Code, which reads as follows: “A Contractor shall not discriminate in the employment of persons upon public works on any basis listed in subdivision (a) of Section 12940 of the Government Code, as those bases are defined in Sections 12926 and 12926.1 of the Government Code, except as otherwise provided in Section 12940 of the Government Code. Every Contractor for public works who violates this section is subject to all the penalties imposed for a violation of this chapter.”
5.05. EIGHT-HOUR DAY LIMITATION
(a) In accordance with the provisions of the Labor Code, and in particular, Sections 1810 to 1815 thereof, inclusive, eight hours labor shall constitute a day’s work, and no worker, in the employ of said Contractor, or any Subcontractor, doing or contracting to do any part of the work contemplated by this Contract, shall be required or permitted to work more than eight (8) hours in any one calendar day and forty (40) hours in any one calendar week in violation of those provisions; provided that subject to Labor Code section 1815, a worker may perform work in excess of either eight (8) hours per day or forty (40) hours during any one week upon compensation for all hours worked in excess of eight (8) hours per day or forty (40) hours during any one week at not less than one and one-half times the basic rate of pay. 301
Updated 2/17/23
(b) The Contractor and each Subcontractor shall also keep an accurate record showing the names and actual hours worked of all workers employed by them in connection with the Work. This record shall be open at all reasonable hours to the inspection of the City, State and Federal officers and agents. It is hereby further agreed that, the Contractor shall forfeit as a penalty to the City the sum of twenty-five dollars ($25.00) for each worker employed in the performance of this Contract by the Contractor or by any of its Subcontractors for each calendar day during which such worker is required or permitted to labor more than eight (8) hours in and one calendar day and forty (40) hours in any one calendar week in violation of Sections 1810 through 1815.
5.06. COMPLIANCE WITH STATE REQUIREMENTS FOR EMPLOYMENT OF
APPRENTICES
The Contractor’s attention is directed to Section 1777.5 of the Labor Code. Provisions of said section pertaining to employment of registered apprentices are hereby incorporated by reference into these Specifications. As applicable, the Contractor or any Subcontractor employed by the Contractor in the performance of the Work shall take such actions as necessary to comply with the provisions of Section 1777.5.
5.07. UNDERGROUND UTILITIES
(a) In accordance with Government Code section 4215, the Contractor shall be compensated for the costs of locating, repairing damage not due to the failure of the Contractor to exercise reasonable care, and removing or relocating existing main or trunkline utility facilities which are not indicated in the Contract Plans and Specifications with reasonable accuracy, and for the equipment on the Project necessarily idled during such work, provided that the Contractor shall first notify the Engineer before commencing work on locating, repairing damage to, removing or relocating such utilities. Contractor shall not be assessed liquidated damages for delays in completing the Work when such delays are due to the failure of either the City or the owner of the utility to provide for removal or relocation of such utility facilities. (b) The Contractor shall take all precautions necessary to protect the existing utilities within the project area. Any utilities damaged due to the Contractor’s negligence shall be repaired or restored to their original condition at the Contractor’s sole expense. Existing utilities shall be kept in service during the life of the Contract unless relocation, reconstruction, abandonment, or outage is specifically authorized by the Engineer. (c) The Contractor shall provide and maintain such temporary supports as may be necessary to preserve the functions of the various utility systems. No wires, conduits and/or pipes shall be removed until all services therein have been made inoperable. (d) The Contractor shall notify the Engineer and appropriate Regional Notification Center for operators of subsurface installations at least two (2) working days, but not more than fourteen (14) calendar days, prior to performing excavation or other work close to any underground pipeline, conduit, duct, wire and other structures. The Contractor shall provide updated information to the Notification Center as required and on a periodic basis. The Regional Notification Center includes but is not limited to the Underground Service Alert-Northern California (USA) at 1-800-642-2444.
(e) The Contractor is advised that the State of California does not participate in USA.
The Contractor is required to notify Caltrans Permits Branch (916) 322-1297 for the location of State facilities.
302
Updated 2/17/23
(f) The Contractor shall not proceed with work until utility facilities involved have been located, disconnected, or otherwise adjusted by utility representatives. (g) The City Utility Maintenance Division will make repairs to all water service laterals and water mains damaged by the Contractor during the course of construction unless directed otherwise by the Engineer. Except as otherwise provided in this section, the Contractor shall be required to pay all labor, material and equipment costs incurred by the City Utilities Maintenance Division for the repairs made to damaged water service laterals and water mains.
The City will bill the Contractor for the repairs and the bills will be paid by the Contractor prior to either the next monthly progress payment or prior to the final payment, whichever comes first.
The Contractor shall provide to the Engineer proof of payment of the repair bills prior to the issuance of either the monthly progress payment or final payment. The current labor and equipment rates for the City Utility Maintenance Division will be made available to the Contractor at the preconstruction conference. The City shall have the right to deduct the total amount of any unpaid City repair bill from the money due or to become due the Contractor.
5.08. WATER POLLUTION
The Contractor shall exercise every reasonable precaution to protect streams, lakes, reservoirs, and canals from pollution with fuels, oils, bitumens, calcium chloride, and other harmful materials and shall conduct and schedule Contractor’s operations so as to avoid or minimize muddying and silting of said streams, lakes, reservoirs, and canals. Care shall be exercised to preserve vegetation beyond the limits of construction. The Contractor shall comply with Section 5650 of the California Fish and Game Code and all other applicable statutes and regulations relating to the prevention and abatement of water pollution.
5.09. PAYMENT OF TAXES
The Contract prices paid for the Work shall include full compensation for all taxes, which the Contractor is required to pay, whether imposed by federal, state, or local governments.
5.10. PERMITS AND LICENSES
The Contractor shall procure all permits and licenses, pay all charges and fees, and give all notices necessary and incident to the lawful prosecution of the work. All permits and licenses shall be obtained in sufficient time to prevent delays to the Work. The Contractor shall, at a minimum, possess and maintain the licenses and permits set forth in the Contract Provisions and shall ensure that its employees possess and maintain any certifications, licenses or permits required to perform work under this Contract, including but not limited to state certifications required by the California Department of Industrial Relations.
5.11. PATENTS
The Contractor shall assume all costs arising from the use of patented materials, equipment, devices, or processes used on or incorporated into the Work, and agrees to indemnify, defend and save harmless the City, the Engineer, and their duly authorized representatives, from all suits at law, or actions of every nature for, or on account of, the use of any patented materials, equipment, devices, or processes.
5.12. PUBLIC CONVENIENCE
This section defines the Contractor’s responsibility with regard to convenience of the public and public traffic in connection with its operations. 303
Updated 2/17/23
(a) The Contractor shall so conduct its operations as to offer the least possible obstruction and inconvenience to the public. The Contractor shall have under construction no greater length or amount of work than can be properly prosecuted with due regard to the rights of the public.
(b) Unless otherwise provided in the Contract Documents, all public traffic shall be permitted to pass through the Work with as little inconvenience and delay as possible. In order to expedite the passage of public traffic through or around the work, the Contractor shall install as appropriate signs, lights, flares, barricades, and other facilities for the sole convenience and direction of public traffic. Also, where directed by the Engineer, the Contractor shall provide and station competent flagpersons whose sole duties shall consist of directing the movement of public traffic through or around the Work. The cost of furnishing and installing such signs, lights, flares, barricades, and other facilities, and the cost of providing and stationing such flagpersons, all for the convenience and direction of public traffic, will be considered as included in the Contract price and no additional compensation will be allowed. (c) Spillage resulting from hauling operations along or across any publicly traveled way shall be removed immediately by the Contractor at its expense. (d) Construction operations shall be conducted in such a manner as to cause as little inconvenience as possible to abutting property owners.
(e) Convenient access to driveways, houses and buildings along the line of the work shall be maintained and temporary approaches to crossings or intersecting highways shall be provided and kept in good condition. When the abutting property owner’s access across the right-of-way line is to be eliminated, or to be replaced under the Contract by other access facilities, the existing access shall not be closed until the replacement access facilities are usable.
(f) Water shall be supplied if ordered by the Engineer for the alleviation or prevention of dust nuisance as provided in the Contract Documents. Any water obtained from a fire hydrant within the City of West Sacramento shall be subject to a fire hydrant permit issued by the Engineering Division of the City of West Sacramento. (g) Flagpersons and guards, while assigned to traffic control, shall perform their duties and shall be provided with the necessary equipment in accordance with the current “Instructions to Flagmen” of the California Department of Transportation. The equipment shall be furnished and kept clean and in good repair by the Contractor at its expense. (h) All traffic control shall be in accordance with California Manual on Uniform Traffic Control Devices (California MUTCD), Part 6 and this Section 5.12. (1) Traffic Control Plans. Traffic Control Plans shall be developed for the project to assure that adequate consideration is given to the safety and convenience of motorists, pedestrians, and workers during construction. The Traffic Control Plans shall include, but not be limited to, signing, pavement markings, construction scheduling, permanent barricades, methods and devices for delineation and channelization, placement and maintenance of devices, roadway lighting, traffic regulations, surveillance and inspection. The Traffic Control Plans shall be approved by the Engineer a minimum of two (2) working days prior to start of any work. Non-compliance with any stipulation of this section will be justification for the City to stop work.
304
Updated 2/17/23
(2) Traffic Control Devices and Procedures. Traffic control devices and procedures shall conform to the California Manual on Uniform Traffic Control Devices (California MUTCD), Part 6 and this Section 5.12. Non-compliance with any stipulation of this section will be justification for the City to stop work.
(3) Elimination of On-Street Parking. The Contractor shall place notification for the elimination of on-street parking, if required, at least forty-eight (48) hours, but not more than seventy-two (72) hours prior to the start of work. The notification shall include the Contractor’s phone number, the City of West Sacramento Community Development Department phone number (916) 617-4645, and the phrase “VEHICLES WILL BE TOWED PURSUANT TO CVC SECTION 22651 (L)”. This notice shall be affixed to a Type II barricade that is placed in the lane of the road (max. 200 ft. spacing) used for on-street parking. No other location or method of placement is acceptable. The notification shall be in a form approved by the Engineer. Non-compliance with any stipulation of this section will be justification for the City to stop work.
(4) Lane Closures. All lane closures shall be included in the Traffic Control Plans, and shall both conform to Section 5.12(h)(2) above, and be approved by the Engineer.
Total road closures will not be allowed for the Project. (5) Measurement and Payment. Unless specifically shown as an item of work on the proposal form, all traffic control shall be considered included in other items of work and no additional compensation will be made for labor, materials or equipment needed.
5.13. CONTINUOUS OPERABILITY OF FACILITIES
Absent written permission by the Engineer, the continuous operation of all existing facilities is required and shall in no way be affected by the Work.
5.14. SAFETY
(a) General
(1) The Contractor shall be solely and completely responsible for the conditions of the job Site, including safety of all persons and property during performance of the Work. This requirement shall apply continuously and not be limited to normal working hours.
Safety provisions shall conform to all applicable federal, state, and local laws, ordinances, and codes, and to the rules and regulations established by the California Division of Industrial Safety, and to other rules of law applicable to the Work. (2) The services of the Engineer in conducting construction review of the Contractor’s performance is not intended to include review of the adequacy of the Contractor’s work methods, equipment, bracing or scaffolding or safety measures, in, on, or near the construction site, and shall not be construed as supervision of the actual construction nor make the Engineer or the City responsible for providing a safe place for the performance of work by the Contractor, Subcontractors, or suppliers; or for access, visits, use work, travel or occupancy by any person.
(3) The Contractor shall carefully instruct all personnel working in potentially hazardous work areas as to potential dangers and shall provide such necessary safety equipment and instruction as is necessary to prevent injury to personnel and damage to property. Special care shall be exercised relative to electrical work, work involving excavation and in sump pump work.
305
Updated 2/17/23
(4) All work and materials shall be in strict accordance with all applicable State, Federal and local laws, rules, regulations, and codes. (5) Nothing in this Contract is to be construed to permit work not conforming to governing law. When Contract Documents differ from governing law, the Contractor shall furnish and install the higher standards called for without extra charge. All equipment furnished shall be grounded and provided with guards and protection as required by safety codes. Where vapor-tight or explosion-proof electrical installation is required by law, this shall be provided. (6) The Contractor shall submit a safety plan and/or narrative description to the Engineer prior to commencement of the Work. This safety plan and/or narrative description shall describe all first aid, safety clothing, etc. to be used at the Project Site. (b) Shoring and Trench Safety Plan
(1) Attention is directed to Section 832 of the Civil Code of the State of California relating to lateral and subjacent support, and the Contractor shall comply with this law.
(2) In accordance with Section 6705 of the State Labor Code, the Contractor shall submit to the City specific plans to show details of provisions for worker protection from caving ground. Not less than thirty (30) days before beginning excavation for any trench or trenches five feet or more in depth required under this Contract, the Contractor shall furnish to the Engineer Working Drawings of its trench safety plan. The trench safety plan Working Drawings shall be detailed plans showing the design of shoring, bracing, sloping or other provisions to be made for worker protection from the hazard of caving ground. If such plan varies from the shoring system standards established by the Construction Safety Orders of the California Division of Industrial Safety or the Federal Safety and Health Regulations for Construction of the Occupational Safety and Health Administration, Department of Labor, the plan shall be prepared by a registered civil or structural engineer. In no event shall the Contractor use a shoring, sloping, or protective system less effective than that required by said Construction Safety Orders, or less effective than that required by said Federal Safety Standards. Submission of this plan in no way relieves the Contractor from the requirement to maintain safety in all operations performed by the Contractor or its Subcontractors.
5.15. BLASTING
Except for exceptional circumstances, blasting shall be prohibited. Accordingly, Bids should be prepared on the basis that no blasting will be permitted. Should blasting be required and expressly approved by the City, the City will issue a Change Order for blasting work.
5.16. INTOXICATING LIQUORS AND NARCOTICS
The Contractor shall not sell, permit or suffer the introduction or use of intoxicating liquors or narcotics upon or about the Site.
5.17. PROTECTION OF PERSONS AND PROPERTY
(a) The Contractor shall take whatever precautions are necessary to prevent damage to all existing improvements, including above ground and underground utilities, trees, shrubbery that is not specifically shown to be removed, fences, signs, mailboxes, survey markers and monuments, buildings, structures, the City’s property, adjacent property, and any other improvements or facilities within or adjacent to the work. If such improvements or property are injured or damaged by reason of the Contractor’s operations, they shall be replaced or 306
Updated 2/17/23
restored, at the Contractor’s expense, to a condition at least as good as the condition they were in prior to the start of the Contractor’s operations.
(b) The Contractor shall adopt all practical means to minimize interference to traffic and public inconvenience, discomfort or damage. The Contractor shall protect against injury to any pipes, conduits or other structures crossing the trenching or encountered in the Work and shall be responsible for any injury done to such pipes or structures, or damage to property resulting therefrom. The Contractor shall support or replace any such structures without delay and without any additional compensation to the entire satisfaction of the Engineer. All obstructions to traffic shall be guarded by barriers illuminated at night. The Contractor shall be responsible for all damage to persons and property directly or indirectly caused by its operations and, under all circumstances, Contractor must comply with the laws and regulations of the State of California relative to safety of persons and property and the interruption of traffic and the convenience of the public within the respective jurisdictions. (c) The Contractor is cautioned that it must replace all improvements in rights-ofway and within the public streets to a condition at least equal to what existed prior to the Contractor’s entry onto the job.
(d) Type and time of construction required at any road subject to interference by the work will be determined by those authorities responsible for maintenance of said road. It shall be the responsibility of the Contractor to determine the nature and extent of all such requirements, including provision of temporary detours as required; however, the construction right-of-way obtained by the City at affected roadways will be adequate for provision of all required detours. As required at any road crossing, the Contractor shall provide all necessary flagpersons, guardrails, barricades, signals, warning signs and lighting to provide for the safety of existing roads and detours. Immediately after the need for temporary detours ceases, or when directed, the Contractor shall remove such detours and perform all necessary cleanup work, including replacement of fences, and removal of pavement. Included shall be all necessary replacement of existing roadway appurtenances, grading work, soil stabilization and dust control measures, as required and directed.
(e) The Contractor shall examine all bridges, culverts, and other structures over which it will move its materials and equipment, and before using them, Contractor shall properly strengthen such structures where necessary. The Contractor shall be responsible for any and all injury or damage to such structures caused by reason of its operations.
5.18. RESPONSIBILITY FOR REPAIR OF FACILITIES
All public or private facilities, including but not limited to, gravel surfacing at existing canals, structures, telephone cables, roadways, curbs, gutters, parking lots, private drives, levees and embankments for creeks, ponds and reservoirs disturbed during construction of the work shall be repaired and/or replaced by the Contractor to match facilities existing prior to construction. In addition, the Contractor shall be responsible for any settlement damage to such facilities or adjoining areas for a period of one year after Acceptance of such required facilities.
5.19. CITY’S REPAIR
In the event the Contractor refuses or neglects to make good any loss or damage for which it is responsible under this Contract, the City may itself or by the employment of others, make good any such loss or damage, and the cost and expense of doing so, including any reasonable engineering, legal and other consultant fees, and any costs of administrative and managerial services, shall be charged to the Contractor. Such costs and expenses may be 307
Updated 2/17/23
deducted by the City from claims for payment made by the Contractor for work completed or remaining to be completed.
5.20. ANTITRUST CLAIM ASSIGNMENT
In entering into a public works contract or a subcontract to supply goods, services, or materials pursuant to this contract, the Contractor and all Subcontractors shall offer and agree to assign to the City all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Sec. 15) or under the Cartwright Act (Chapter 2 (commencing with Section 16700) of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, services or materials pursuant to the public works contract or subcontract. This assignment shall be made and become effective at the time the City tenders final payment to the Contractor, without further acknowledgement by the parties.
5.21. WAIVER OF RIGHT TO RESCIND FOR MATERIAL BREACH
The Contractor agrees that it can be adequately compensated by money damages for any breach of this Contract which may be committed by the City and hereby agrees that no default, act, or omission of the City or the Engineer, shall constitute a material breach of the Contract entitling the Contractor to cancel or rescind the provisions of this Contract or (unless the City shall so consent or direct in writing) to suspend or abandon performance of all or any part of the Work. The Contractor hereby waives any and all rights and remedies to which it might otherwise be or become entitled, save only its right to money damages.
5.22. CONTRACTOR’S LICENSE NOTICE
CONTRACTORS ARE REQUIRED BY LAW TO BE LICENSED AND REGULATED BY THE CONTRACTORS’ STATE LICENSE BOARD. ANY QUESTIONS CONCERNING A CONTRACTOR MAY BE REFERRED TO:
REGISTRAR CONTRACTORS’ STATE LICENSE BOARD
9821 BUSINESS PARK DRIVE
SACRAMENTO, CALIFORNIA 95827
MAILING ADDRESS:
P.O. BOX 26000
SACRAMENTO, CALIFORNIA 95826
5.23. HISTORICAL, SCIENTIFIC AND ARCHEOLOGICAL DISCOVERIES All articles of historical or scientific value, including but not limited to coins, fossils, and articles of antiquity which may be uncovered by the Contractor during the progress of work, shall become City property. Such findings shall be reported immediately to the Engineer who will determine the method of removal, where necessary, and the final disposition thereof.
5.24. INSURANCE
Contractor shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to property, which may arise from or in connection with the performance of the Work hereunder by the Contractor, its agents, representatives, employees or Subcontractors. The cost of such insurance shall be included in the Contractor’s bid.
308
Updated 2/17/23
(a) Neither the Contractor nor any Subcontractors shall commence any work until all required insurance has been obtained at their own expense. Such insurance must have the approval of the City as to limit, form, and amount, and shall be placed with insurers with a current A. M. Best’s rating of no less than A-VII.
(b) Any insurance bearing on adequacy of performance shall be maintained after completion of the project for the full guarantee period. (c) Prior to execution of the Contract, the Contractor shall furnish the City with original endorsements effecting coverage for all policies required by the Contract. The endorsements shall be signed by a person authorized by the insurer to bind coverage on its behalf. The endorsements are to be on forms provided or approved by the City. The City may require the Contractor or any Subcontractor to furnish complete certified copies of all insurance policies affecting the coverage required by the Contract. (d) All of the Contractor’s policies shall contain an endorsement providing that written notice shall be given to the City at least sixty (60) calendar days prior to termination, cancellation, or reduction of coverage in the policy.
(e) Any policy or policies of insurance that the Contractor elects to carry as insurance against loss or damage to its construction equipment and tools shall include a provision therein providing a waiver of the insurer’s right to subrogation against the City and the Engineer.
(f) The requirements as to the types, limits, and the City’s approval of insurance coverage to be maintained by the Contractor are not intended to and shall not in any manner limit or qualify the liabilities and obligations assumed by the Contractor under the Contract. (g) In addition to any other remedy the City may have, if the Contractor or any of the Subcontractors fails to maintain the insurance coverage as required in this section, the City may obtain such insurance coverage as is not being maintained, in form and amount substantially the same as required herein, and the City may deduct the cost of such insurance from any amounts due or which may become due the Contractor under this Contract. (h) The Contractor and all Subcontractors shall, at their expense, maintain in effect at all times during the performance of work under the Contract not less than the following coverage and limits of insurance, which shall be maintained with insurers and under forms of policy satisfactory to the City. The maintenance by the Contractor and all Subcontractors of the following coverage and limits of insurance is a material element of this Contract. The failure of the Contractor or any Subcontractor to maintain or renew coverage or to provide evidence of renewal may be treated by the City as a material breach of this contract. (1) Workers’ Compensation and Employer’s Liability Insurance (i) Workers’ Compensation
The Contractor and all Subcontractors shall maintain insurance to protect the Contractor or Subcontractor from all claims under Workers’ Compensation and Employer’s Liability Acts, including Longshoremen’s and Harbor Workers’ Act. Such coverage shall be maintained, in type and amount, in strict compliance with all applicable State and Federal statutes and regulations. The Contractor shall execute a certificate in compliance with Labor Code section 1861, on the form provided in the Contract Documents. (ii) Claims Against City
309
Updated 2/17/23
If an injury occurs to any employee of the Contractor or any of the Subcontractors for which the employee or its dependents, in the event of its death, may be entitled to compensation from the City under the provisions of the said Acts, or for which compensation is claimed from the City, there will be retained out of the sums due the Contractor under this Contract, an amount sufficient to cover such compensation as fixed by said Acts, until such compensation is paid or it is determined that no compensation is due. If the City is required to pay such compensation, the amount so paid will be deducted and retained from such sums due, or to become due, the Contractor.
(2) Commercial General and Automobile Liability Insurance The Contractor shall maintain in effect at all times during the performance of the work hereunder not less than the following coverage’s and limits of Commercial General and Automobile Liability insurance:
(i) Form and Amount
The insurance shall include, but shall not be limited to, protection against claims arising from death, bodily injury, personal injury, or damage to property resulting from actions, failures to act, operations or equipment of the insured, or by its employees, agents or consultants, or by anyone directly or indirectly employed by the insured. The amount of insurance coverage shall not be less than $1,000,000.00 per occurrence with an aggregate no less than two (2) times the required per occurrence limit applying to bodily injury, personal injury, and property damage, or any combination of the three. Any deductibles must be declared to and approved by the City. At the option of the City, either: the insurer shall reduce or eliminate such deductibles as respects the entity, its officers, officials, employees and volunteers; or the Contractor shall procure a bond guaranteeing payment of losses and related investigations, claim administration expenses, and defense expenses. The commercial general and automobile liability insurance coverage shall also include the following:
(ii) Additional Requirements
Provision or endorsement naming the City, the Engineer and its consultants, and each of their officers, employees, and agents, each as additional insured’s with respect to any potential liability arising out of the performance of any work under the Contract, and providing that such insurance is primary insurance as respects the interest of the City and Engineer, and its consultants, and each of their officers, employees, and agents and that any other insurance, risk pool membership, or other liability protection maintained by the City or maintained by the Engineer is excess to the insurance required hereunder, and will not be called upon to contribute to any loss unless and until all limits available under the Contractor ‘s and Subcontractor’s insurance policy/policies have been paid. The additional insured coverage under the Contractor’s policy shall be “primary and non-contributory” and will not seek contribution from the City’s insurance or self-insurance and shall be at least as broad as CG 20 01 04 13.
(iii) “Cross Liability” or “Severability of Interest” clause. (iv) Broad Form Property Damage, Personal Injury, Contractual Liability, Protective Liability, and Completed Operations coverage’s, and elimination of any exclusion regarding loss or damage to property caused by explosion or resulting from collapse of buildings or structures or damage to property underground, commonly referred to by insurers as the “XCU” hazards.
310
Updated 2/17/23
(v) Provision or endorsement stating that such insurance, subject to all of its other terms and conditions, applies to the liability assumed by the Contractor under the Contract, including, without limitation, that set forth in Section 4.02, Indemnity and Litigation Costs.
(vi) Provision or endorsement stating that any failure to comply with reporting or other provisions of the policies, including breaches of warranties, shall not affect coverage provided to the City, its officers, officials, employees, or volunteers. (vii) The Contractor’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer’s liability.
(3) Builder’s Risk or Installation Floater “All-Risk” Insurance. Before commencement of the Work, the Contractor shall submit written evidence that it has obtained for the period of the Contract, Builder’s Risk “All-Risk” Completed Value Insurance and/or Inland Marine “All-Risk” Installation Floater Insurance, as may be applicable, upon the entire project which is the subject of this Contract, including completed work and work in progress. The policy or policies of insurance shall name the Contractor, City, and Engineer as insured’s as their respective interests may appear, and shall include an insurer’s waiver of subrogation rights in favor of each. Such insurance may have a deductible clause, but the amount of the deductible shall be subject to the approval of the City, except that the deductible on earthquake coverage may be in accordance with the underwriter’s requirements.
5.25. INDEMNITY AND LITIGATION COST
(a) Promptly upon execution of the Contract, the Contractor specifically obligates itself and hereby agrees to protect, hold free and harmless, defend and indemnify the City, the Engineer and its consultants, and each of their officers, employees and agents, from any and all liability, penalties, costs, losses, damages, expenses, causes of action, claims or judgments, including attorney’s fees, which arise out of or are in any way connected with the Contractor’s, or its Subcontractors’ or suppliers’, performance of work under this Contract or failure to comply with any of the obligations contained in the Contract. This indemnity shall imply no reciprocal right of the Contractor in any action on the contract pursuant to California Civil Code section 1717 or section 1717.5. To the fullest extent legally permissible, this indemnity, defense and hold harmless agreement by the Contractor shall apply to any and all acts or omissions, whether active or passive, on the part of the Contractor or its agents, employees, representatives, or Subcontractor’s agents, employees and representatives, resulting in claim or liability, irrespective of whether or not any acts or omissions of the parties to be indemnified hereunder may also have been a contributing factor to the liability, except such loss or damage which was caused by the active negligence, the sole negligence, or the willful misconduct of the City. The Contractor’s obligations under this Section shall apply to claims arising from the Contractor’s mistake, error, or neglect in preparing its Bid for this project. The Contractor’s obligations under this Section shall apply to claims arising from the Contractor’s mistake, error, or neglect in preparing its Bid for this project.
(b) In any and all claims against the City, the Engineer and each of their consultants, officers, employees and agents by any employee of the Contractor, any Subcontractor, anyone directly or indirectly employed by any of them, or anyone for whose acts any of them may be liable, the indemnification obligation under this section shall not be limited in way by any limitation on the amount or type of damages, compensation or benefits payable by or for the Contractor or any Subcontractor under Workers’ Compensation statutes, disability benefit statutes or other employee benefit statutes.
311
Updated 2/17/23
5.26. PROTECTION OF WORK
(a) The Contractor shall be responsible for the care of all the Work until its completion and final acceptance. The Contractor shall, at its own expense, replace damaged or lost material and repair damaged parts of the Work or the same may be done at the Contractor’s expense by the City and the Contractor and its sureties shall be liable therefor. The Contractor shall make its own provisions for properly storing and protecting all material and equipment against theft, injury, or damage from any and all causes. Damaged material and equipment shall not be used in the Work. The Contractor shall take all risks from floods and casualties except as provided by law, and shall make no charge for the restoration of such portions of the work as may be destroyed or damaged by flood or other casualties or because of danger from flood or other casualties or for delays from such causes. The Contractor may, however, be allowed a reasonable extension of time on account of such delays, subject to the conditions herein before specified. The Contractor shall not be responsible for the cost, in excess of 5% of the contracted amount, of repairing or restoring damage to the Work, if the damage was proximately caused by an earthquake in excess of a magnitude of 3.5 on the Richter Scale or by tidal wave’ s; provided that the Work damaged was built in accordance with accepted and applicable building standards, and the plans and specifications of the City. (b) Contractor shall effectively secure and protect adjacent property and structures, livestock, crops and other vegetation. If applicable, the Contractor shall open fences on or crossing the right-of-way and install temporary gates of sound construction thereon so as to prevent the escape of livestock. Adjacent fence posts shall be adequately braced to prevent the sagging or slackening of the wire. Before such fences are opened, the Contractor shall notify the owner or tenant of the property and, where practicable, the opening of the fence shall be in accordance with the wishes of said owner or tenant. The Contractor shall be responsible that no loss or inconvenience shall accrue to the owner or tenant by virtue of their fences having been opened or the gate not having been either shut or attended at all times. Where special types of fences are encountered, the Contractor shall install temporary gates made of similar materials and of suitable quality to serve the purposes of the original fences. In all cases where the Contractor removes fences to obtain workroom, the Contractor shall provide and install temporary fencing as required, and on completion of construction shall restore the original fence to the satisfaction of the Engineer. All costs of providing, maintaining and restoring gates and fencing shall be home by the Contractor. The Contractor shall provide and maintain all passageways, guard fences, lights and other facilities for protection required by public authority or local conditions.
(c) The Contractor shall use extreme care during construction to prevent damage from dust to crops and adjacent property. The Contractor, at its own expense, shall provide adequate dust control for the right-of-way and take other preventative measures as directed by the Engineer.
(d) The Contractor shall be responsible for all damage to any property resulting from trespass by the Contractor or its employees in the course of their employment, whether such trespass was committed with or without the consent or knowledge of the Contractor. (e) The Contractor shall see that the Site is kept drained and free of all ground water and any other water, which may impede the progress or execution of the Work. (f) The Contractor shall be responsible for any damage caused by drainage or water runoff from construction areas and from construction plant areas. 312
Updated 2/17/23
(g) In an emergency affecting the safety of life, the Work, or adjoining property, the Contractor, without special instruction or authorization from the Engineer, is hereby permitted to act at its discretion to prevent such threatened loss or injury, and the Contractor shall so act without appeal if so instructed or authorized. Any compensation claimed by the Contractor on account of emergency work shall be determined as specified In Section 2.07. Should the Engineer deem an emergency condition to exist, the Contractor shall immediately do those things and take those steps ordered by the Engineer. The decision of the Engineer in this respect shall be final and conclusive. Any claims for compensation made by the Contractor on account of emergency work shall be determined as specified in Section 2.07. (h) Except as provided by Government Code section 4215, the Contractor shall be responsible for the removal, relocation and protection of all public and private utilities, including irrigation facilities in the nature of utilities, located on the site of the construction project if and to the extent that the same are identified in the Contract Documents, and the Contractor shall not be entitled to any extension of time or claim for damages for extra compensation in connection therewith. If and to the extent that such utilities or facilities are not identified in the Contract Documents, as between the Contractor and the City, the City will be responsible for the cost of their removal, relocation or protection, as the case may be, but the Contractor shall perform any such work in conformance with applicable provisions of Sections 2.06 and 2.07, if so directed by the Engineer. In such situations the Contractor shall not be responsible for delay in completion of the project caused by the failure of the City or the owner of the utility to provide for such removal or relocation. If the Contractor, while performing the Contract, discovers utility or irrigation facilities not identified by the City in the Contract Documents, the Contractor shall immediately notify the Engineer in writing.
(i) Subject to the provisions of this section, where the Work to be performed under the Contract crosses or otherwise interferes with existing streams, watercourses, canals, farm ditches, pipelines, drainage channels, or water supplies, the Contractor shall provide for such watercourse or pipelines and shall perform such construction during the progress of the Work so that no damage will result to either public or private interests, and the Contractor shall be liable for all damage that may result from failure to so provide during the progress of the Work.
5.27. ACCIDENTS
(a) The Contractor shall provide and maintain, in accordance with Labor Code section 6708 and OSHA requirements, adequate emergency first-aid treatment for its employees and anyone else who may be injured in connection with the Work. (b) The Contractor shall promptly report in writing to the Engineer all accidents whatsoever arising out of or in connection with, the performance of the Work, whether on or adjacent to the site, which caused death, personal injury, or property damage, giving full details and statements of witnesses. In addition, if death or serious injury or serious damage are caused, the accident shall be reported immediately by telephone or messenger to the City and the Engineer.
(c) If any claim is made by anyone against the Contractor or any Subcontractor on account of any accident, the Contractor shall promptly report the facts in writing to the Engineer, giving full details of the claim.
313
Updated 2/17/23
5.28. NO PERSONAL LIABILITY
Neither the City, the Engineer, nor any of their other officers, agents, or employees shall be personally responsible for any liability arising under the Contract, except such obligations as are specifically set forth herein.
314
Updated 2/17/23
SECTION 6
PROGRESS AND COMPLETION OF WORK
6.01. PROGRESS SCHEDULE
The Contractor shall submit within ten (10) days after execution of the Contract a detailed work schedule(s) which shall detail the actions of the Contractor and Subcontractors working at the Site. This schedule(s) shall both show the dates at which the Contractor will start and complete and conform to the completion time specified in the Contract. The controlling operation, defined as the least float path, if any, shall be identified.
The Contractor shall review, revise and resubmit the progress schedule at least once a month to reflect progress. In any event, Contractor shall submit, at any time during the contract period, a current schedule to the Engineer at the Engineer’s request.
No progress payments will be made for any work performed until a satisfactory schedule has been submitted and approved by the Engineer. An updated schedule shall be required from the Contractor if the project falls ten (10) working days behind schedule.
If the Work falls behind the accepted schedule, the Contractor shall promptly take whatever actions are necessary to put the project back on schedule. For delays or portions of delays for which the Contractor is responsible, no payment will be made or time extension allowed for increase in work force, equipment, and working hours needed to put the project on schedule.
6.02. COMMENCEMENT AND PROGRESS OF THE WORK AND TIME OF COMPLETION (a) Commencement
The Contractor shall begin the Work after receiving a Notice to Proceed within the period of time set forth in the Contract Provisions. Thereafter, Contractor shall diligently prosecute the Work to completion as specified in the Contract Documents. The Engineer shall have the right to specify the locations where Contractor shall start and proceed with the Work.
A preconstruction conference will be convened after the Contractor has delivered the necessary bonds, insurance certificates and signed agreement in proper form as required in the invitation to bid, Bid proposal and general conditions of these specifications. Prior to any work, the Contractor shall provide the Engineer with a list of key personnel assigned to the project and the telephone numbers where they may be reached at any time. The list shall be made available in sufficient copies and presented at the preconstruction conference.
Notwithstanding any other provisions of the Contract, the City shall not be obligated to accept or pay for any work furnished by the Contractor prior to the issuance of the Notice to Proceed whether or not the City has knowledge of the furnishing of such work. The Contractor shall not commence with work on this project until its Contract bonds and evidence of insurance comply with all Contract requirements and a Notice to Proceed has been issued.
The Contractor shall notify the Engineer in writing two (2) working days (48 hours) prior to commencement of work on the Project or scheduling work for a Saturday, Sunday, or City Holiday. Failure to provide said notification will void the City’s obligation to provide inspection.
Any work done in the absence of the City’s Inspector shall be subject to rejection. 315
Updated 2/17/23
(b) Completion
All work under this Contract shall be completed within the period of time set forth in the Contract Provisions. The Contract shall be deemed completed when the Engineer has certified the completion of the Project as provided in Section 9.07 of these General Conditions.
6.03. SUSPENSION OF WORK
(a) The Engineer may at any time, by notice in writing to the Contractor, suspend any part of the Work for such period of time as may be necessary to prevent improper execution of the Work on the project by the Contractor, its Subcontractors or agents, and the Contractor shall have no claim for damages or additional compensation on account of any such suspension.
(b) The City may at any time suspend any part or all of the Work upon ten (10) days written notice to the Contractor, who shall thereupon discontinue all work suspended except for all operations to prevent loss or damage to work already executed as may be directed by the Engineer. Work shall be resumed by the Contractor after such suspension on written notice from the City.
(c) In the event of any suspension of the Work in whole or in part under subsection (B) above, the Contractor shall be entitled to an extension of time wherein to complete the Work to the extent of the delay caused to the Contractor thereby. (d) In the event the entire work shall be suspended by order of the City, as herein above provided, and shall remain so suspended for a period of sixty (60) consecutive days, through no fault of the Contractor, and notice to resume the Work shall not have been served on the Contractor as herein above provided, Contractor may, at its option, by written notice to the City, terminate the Contract in the same manner as if the termination had been initiated by the City, and the City shall have no claim for damages because of such termination of the Contract.
6.04. DELAY IN THE WORK – TIME EXTENSIONS
The Contractor shall at all times employ such force, plant, materials, and tools as will be sufficient, in the opinion of the Engineer, to prosecute the Work at not less than the rates fixed under the terms of the Contract and to complete the Work thereof within the time limits fixed therein. If the Contractor refuses or fails to prosecute the Work, or any separable part thereof, with such diligence as will ensure the completion within the time specified in the Contract, or any extension thereof, or fails to complete said work within such time, the City may exercise the termination provisions set forth in Section 6.05, below. (a) Excusable Delays. Excusable delays shall be delays in the controlling operation of the Contractor’s work due to strikes, lockouts by others, fire, unusual delay in transportation, unavoidable casualties, adverse weather conditions which could not have been reasonably anticipated, or any other act(s) of God beyond the Contractor’s control, or by delay authorized by the City, or by any cause which the City shall decide to justify the delay. Except as provided in Section 6.04(f), below, in the event of an excusable delay, the time of completion shall be extended for such reasonable time as the City may decide. The Contractor’s right to an extension of time for an excusable delay is expressly subject to Contractor’s giving written notice of such claim within ten (10) days following the date the Contractor knew or should have known of the delay. Failure to give such notice shall be construed as a waiver of such right. It is understood and agreed that extensions of time shall be the Contractor’s sole and exclusive remedy for excusable delays.
316
Updated 2/17/23
(b) Compensable delays. Compensable delays shall be delays in the controlling operating of the Contractor’s work due to acts or neglect of the City, its employees or those under it by contract or otherwise, or by changes ordered in the work. In the event of a compensable delay, the time of completion shall be extended for such reasonable time as the City may decide. In addition, the Contractor may recover its direct costs as provided in Section
6.05. The Contractor’s remedies for compensable delays are expressly subject to Contractor’s giving ten (10) days written notice of such claim from the date the Contractor knew or should have known of the delay. It is understood and agreed that the Contractor’s sole and exclusive remedies for compensable delays shall be an extension of the time and recovery of its direct costs as compensable hereunder, but only in accordance with the provisions of the Contract Documents.
(c) Contractor and City understand and agree that the Contract time for the completion of this project is a very important part of the contract. Extensions of time will only be granted as provided above when events actually cause the Contractor to be delayed in the performance of that schedule activity which is the controlling operation as of the time of the delay. When acts or omissions occur which could cause delay, Contractor will take all reasonable means in order to be able to continue to work as scheduled without any delay, or as short a delay as possible. Additionally, if inclement weather causes accumulation of standing water on the work site or other conditions which might cause delay, Contractor shall take all measures reasonably necessary to permit work to continue as quickly as possible. (d) If adverse weather conditions are the basis for a claim for additional time, such claim shall be documented by date substantiating that weather conditions were abnormal for the period of time and could not have been reasonably anticipated, and that weather conditions had an adverse effect on the scheduled construction. Adverse weather conditions shall be considered only as those conditions that exceed the average annual number of rain days and rain quantities as established by the Annual Local Climatological Summary and NOAA National Technical Memorandum NWS WR-65 (Revised) as published by the United States Government, National Weather Service, National Climate Center, Asheville, North Carolina. (e) The Engineer shall be responsible for determining when adverse weather conditions result in non-workable days. It shall be the Contractor’s duty to stay informed of such determinations by the Engineer. The Contractor may object to such adverse weather determinations by filing with the Engineer a written notice of objection. The notice of objection shall state the basis of the objection and provide supporting documentation, which substantiates that weather conditions were abnormal for the period of time and could not have been reasonably anticipated, and that weather conditions had an adverse effect on the scheduled construction. All such notices of objection shall be filed within three (3) days of the day in dispute. It is hereby agreed that the Contractor’s failure to submit a written notice of objection within three (3) days of the Engineer’s adverse weather determination shall constitute a waiver by the Contractor of all its rights to further protest, judicial or otherwise. (f) The Engineer will, within a reasonable period of time, issue a ruling on the Contractor’s notice of objection. All such rulings by the Engineer shall be final, unless the Contractor files a written protest within fifteen (15) days of the Engineer’s ruling. This protest shall clearly state the basis of the dispute. Such protest will be forwarded promptly to the City, which will issue a decision on each such protest. The City decision will be final. Pending the City decision, the Contractor shall proceed with its work in accordance with the Engineer’s ruling and/or instructions. It is hereby agreed that the Contractor’s failure to file a protest within fifteen days (15) of the Engineer’s ruling shall constitute a waiver by the Contractor of all its rights to further protest, judicial or otherwise.
317
Updated 2/17/23
(g) The number of days that are anticipated to be non-workable due to adverse weather conditions shall be as set forth in Section 4.0 of the Special Conditions. Days deemed non-workable by the Engineer in excess of such anticipated number shall be considered excusable delays.
(h) Unexcused delays shall be delays in the Contractor’s work due to acts or neglect of the Contractor, its employees, Subcontractors or those under it by contract or otherwise. In the event of an unexcused delay, the Contractor expressly agrees that it shall not be entitled to either an extension of time or recovery of its costs.
(i) A request for an extension of time, or the granting of an extension of time, shall not constitute a basis for any claim against the City for additional compensation or damages unless caused by the City or another Contractor employed by the City.
6.05. DAMAGES FOR DELAY
In the event of compensable delay, the City shall only be liable for idle equipment, idle workers and the necessary costs of transporting equipment. The City shall be liable to the extent that the compensable delay is concurrent with excusable delays or Contractor caused delays to the controlling operation. The allowable costs shall be as for force account work under Section 2.04 with the following exceptions:
(a) The Delay Factor in the Labor Surcharge and Equipment Rental Rules applies to each equipment rental rate;
(b) The daily number of payable hours shall equal the normal working hours during the delay, not to exceed eight (8) hours per day; and
(c) No markups will be added.
6.06. TERMINATION FOR CONVENIENCE
If at any time before completion of the Work, the City determines that it is either impossible or against the interests of the City to complete the Work, or if the Work is stopped by an injunction of a court of competent jurisdiction or by order of any competent authority, the City may, upon ten (10) days written notice to the Contractor, discontinue the Work and terminate the Contract. Upon service of such notice of termination, the Contractor shall discontinue the Work in such manner, sequence, and at such times as described below. The Contractor shall have no claim for damages for such discontinuance or termination, nor any claim for anticipated profits on the Work thus dispensed with, nor any other actually performed up to the time of discontinuance, including any Extra Work ordered by the Engineer to be done, nor for any claim for liquidated damages.
Termination of the Contract for convenience and the total compensation payable to the Contractor in the event of termination shall be governed by the following:
(a) The Engineer will issue the Contractor a written notice signed by the Engineer, specifying that the Contract is to be terminated. Upon receipt of said written notice and, except as otherwise directed in writing by the Engineer, the Contractor shall:
(1) Stop all Work under the Contract except that specifically directed to be completed prior to Acceptance.
318
Updated 2/17/23
(2) Perform Work the Engineer deems necessary to secure the project for termination.
(3) Remove equipment from the site of the Work.
(4) Take such action as is necessary to protect materials from damage. (5) Notify all Subcontractors and suppliers that the Contract is being terminated and that their contracts or orders are not to be further performed unless otherwise authorized in writing by the Engineer.
(6) Provide the Engineer with an inventory list of all material previously produced, purchased or ordered from suppliers for use in the Work and not yet used in the Work, including its storage location, and such other information as the Engineer may request. (7) Dispose of material not yet used in the Work as directed by the Engineer.
It shall be the Contractor’s responsibility to provide the City with good title to all materials purchased by the City hereunder, including material for which partial payment has been made and with bills of sale or other documents of title for such materials.
(8) Subject to the prior written approval of the Engineer, settle all outstanding liabilities and all claims arising out of subcontracts or orders for material terminated hereunder.
To the extent directed by the Engineer, the Contractor shall assign to the City all the right, title and interest of the Contractor under subcontracts or orders for materials terminated hereunder. (9) Furnish the Engineer with the documentation required to be furnished by the Contractor under the provisions of the Contract including, on projects as to which Federal funds are involved, all documentation required under the Federal requirements included in the Contract.
(10) Take such other actions as the Engineer may direct. (b) Termination of the Contract shall not relieve the Contractor of responsibility for damage to materials except as follows:
(1) The Contractor’s responsibility for damage to materials for which partial payment has been made and for materials furnished by the City for use in the Work and unused shall terminate when the Engineer certifies that such materials have been stored in the manner and at the locations he or she has directed.
(2) The Contractor’s responsibility for damage to materials purchased by the City subsequent to the issuance of the notice that the Contract is to be terminated shall terminate when title and delivery of such materials has been taken by the City. (3) When the Engineer determines that the Contractor has completed the Work under the Contract directed to be completed prior to termination and such other Work as may have been ordered to secure the project for termination, he or she will recommend that the Engineer formally accept the Contract, and immediately upon and after such Acceptance by the Engineer, the Contractor will not be required to perform any further Work thereon and shall be relieved of his or her Contractual responsibilities for injury to persons or damage to property which occurs after the formal Acceptance of the project by the Engineer. 319
Updated 2/17/23
(c) The total compensation to be paid to the Contractor shall be determined by the Engineer on the basis of the following:
(1) The reasonable cost to the Contractor, without profit, for all Work performed under the Contract, including mobilization, demobilization and Work done to secure the project for termination. Reasonable cost will include a reasonable allowance for project Overhead and general administrative Overhead not to exceed a total of seven (7%) percent of Direct Costs of such Work.
(2) A reasonable allowance for profit on the cost of the Work performed as determined under Section 2.04(a) above, provided the Contractor establishes to the satisfaction of the Engineer that it is reasonably probable that he or she would have made a profit had the Contract been completed and provided further, that the profit allowed shall in no event exceed four (4%) percent of said cost.
(3) The reasonable cost to the Contractor of handling material returned to the vendor, delivered to the City or otherwise disposed of as directed by the Engineer. (4) A reasonable allowance for the Contractor’s administrative costs in determining the amount payable due to termination of the Contract.
All records of the Contractor and the Subcontractors, necessary to determine compensation in accordance with this section shall be open to inspection or audit by representatives of the City at all times after issuance of the notice that the Contract is to be terminated and for a period of three (3) years, and such records shall be retained for that period.
After Termination of the Work by the Engineer, the Engineer may make payments on the basis of interim estimates pending issuance of the Final Statement, when in his or her opinion the amount thus paid, together with all amounts previously paid or allowed, will not result in total compensation in excess of that to which the Contractor will be entitled.
All payments, including payment upon the Final Statement, shall be subject to deduction for prior payments and amounts, if any, to be kept or retained under the provisions of the Contract.
(d) The provisions of this section shall be included in all subcontracts.
6.07. TERMINATION FOR DEFAULT
(a) In the event of any default by the Contractor as described below, the City may, after giving ten (10) days’ written notice to the Contractor, terminate the Contractor’s right to proceed with the Work or any part of the Work in the City’s sole discretion. Events of default include:
(1) Failure or refusal to prosecute the Work, or any separable part thereof, with such diligence as will ensure the completion within the time specified in the Contract, or any extension thereof, or failure to complete said work within such time. (2) Filing of bankruptcy by the Contractor, or the making of a general assignment for the benefit of its creditors, or appointment of a receiver on account of Contractor’s insolvency without discharge of the receiver within ten (10) days after its appointment.
(3) Failure to make prompt payments to Subcontractors or suppliers. 320
Updated 2/17/23
(4) Persistent disregard of laws, ordinances, or the instructions of the Engineer, or other substantial violation of any provision of the Contract. (b) In the event the right of the Contractor to proceed with the Work, or any portion thereof, has been terminated because of the default of the Contractor and the Contractor has been given ten (10) days’ notice to cure such fault and has not done so, the City may take over the Work and prosecute the same to completion by contract or any other method the City deems expedient, and may take possession of and utilize in completing the Work such materials, appliances, equipment and plant as may be on the site of the Work and necessary therefore. In such event, the Contractor and its sureties shall be liable for all damages including costs of managerial and administrative services, engineering, legal and other consultant fees, and liquidated damages sustained or incurred by the City. (c) Upon termination, the Contractor shall not be entitled to receive any further payment until the Work is finished. If upon completion of the Work the total cost to the City, including engineering, legal and other consultant fees, costs of managerial and administrative services, construction costs, and liquidated damages shall be less than the amount which would have been paid if the Work had been completed by the Contractor in accordance with the terms of the Contract, then the difference shall be paid to the Contractor in the same manner as the final payment under the Contract. If the total cost incurred by the City on account of termination of the Contract and subsequent completion of the Work by the City by whatever method the City may deem expedient shall exceed said amount which the Contractor would otherwise have been paid, the Contractor and its sureties shall be liable to the City for the full amount of such excess expense.
(d) The rights and remedies of the City provided in this section are in addition to any of the rights and remedies provided by the law or under this Contract.
6.08. FAILURE TO TIMELY COMPLETE THE WORK – LIQUIDATED DAMAGES (a) Liquidated Damages
(1) It is agreed by the parties to this Contract that time is of the essence. In the event all the Work is not completed before or upon the expiration of the time limit as set in the Bid, Contract and/or Progress Schedule, or within any time extensions that may have been granted, damage will be sustained by the City; and that it may be impracticable to determine the actual amount of damage by reason of such delay. Accordingly, it is agreed that the Contractor shall pay to the City as damages the amount set forth for each and every day’s delay in finishing the Work in excess of the number of days specified. Liquidated damages shall be paid at a rate of one thousand dollars ($1,000.00) per day unless otherwise stated in the Contract Documents.
The parties expressly agree that the liquidated damage clause found in the Contract Documents is reasonable under the circumstances existing at the time the Contract was made. The City shall have the right to deduct the amount of liquidated damages from any money due or to become due the Contractor.
(2) In addition, the City shall have the right to charge to the Contractor and to deduct from the final or progress payments for the Work the actual cost to the City of legal, engineering, inspection, superintendence, and other expenses, which are directly chargeable to the Contract and which accrue during the period of such delay, except that the cost of final inspection and preparation of the final estimate shall not be included in the charges. (b) Exclusions
321
Updated 2/17/23
Notwithstanding the provisions of Section 2.06(a), the Contractor shall not be liable for liquidated damages or delays caused by the removal or relocation of utilities when such removal or relocation is the responsibility of the City or the owner of the utility under Government Code section 4215.
6.09. CLEAN-UP
During the progress of the Work, the Contractor shall maintain the Site and related structures and equipment in a clean, orderly condition and free from unsightly accumulation of rubbish. All waste materials shall be removed daily from the Site and disposed of by the Contractor by any proper means at its own expense unless designated otherwise on the plans.
No waste materials shall be placed in the public street right-of-way. Unless otherwise specified, all existing piping, materials and/or equipment removed pursuant to this Contract shall become the Contractor’s property.
Upon completion of the Work and before the final estimate is submitted, the Contractor shall, at its own cost and expense, remove from the vicinity of the Work all plants, buildings, rubbish, unused work materials, concrete forms, and temporary bridging and other like materials, belonging to the Contractor or used under the Contractor’s direction during the construction, and in the event of the Contractor’s failure to do so, the same may be removed by the City after ten (10) calendar days’ notice to the Contractor. Such removal shall be at the expense of the Contractor.
The Contractor shall use care in the removal of materials and equipment so as not to cause damage to existing facilities and structures. Contractor shall assume liability for all such damage. Where the construction has crossed yards or driveways, restoration shall be by the Contractor to the complete satisfaction of the Engineer, at the Contractor’s expense.
The Contractor shall make its own arrangements for the disposal of waste materials. If the Contractor elects to dispose of such materials on private property, Contractor shall obtain written permission from all property owners involved.
322
Updated 2/17/23
SECTION 7
MEASUREMENT AND PAYMENT
7.01. MEASUREMENT OF QUANTITIES
(a) Where the Contract provides for payment on a lump sum price basis, no measurement of quantity will be made. Where the Contract provides for payment on a unit price basis, the quantities of work performed will be computed by the Engineer on the basis of measurements taken by the Engineer, and these measurements shall be final and conclusive. (b) All quantities of work computed under the Contract shall be based upon measurements by the Engineer according to United States Measurements and Weights. (c) Methods of measurement are specified herein and in the Technical Specifications.
(d) Mobilization shall be measured and payment issued according to Section 11 of the State Standard Specifications.
7.02. SCOPE OF PAYMENT
(a) The Contractor shall accept the compensation provided in the Contract as full payment for furnishing all labor, materials, tools, equipment, and incidentals necessary to the completed work and for performing all work contemplated and embraced under the Contract; also for loss or damage arising from the nature of the work, or from the action of the elements, or from any unforeseen difficulties which may be encountered during the prosecution of the Work until the Acceptance by the City and for all risks of every description connected with the prosecution of the Work, also for all expenses incurred in consequence of the suspension or discontinuance of the work as provided in the Contract; and for completing the Work according to the Specifications and Plans. Neither the payment of any estimate nor of any retained percentage shall relieve the Contractor of any obligation to make good any defective work or material.
(b) No compensation will be made in any case for loss of anticipated profits.
Increased or decreased work involving supplemental agreements will be paid for as provided in such agreements.
(c) The Work includes the preparatory work and operations needed for mobilization and demobilization of the Project. The Work, however, does not include establishing the Engineer’s field facility(s) of utility work and connections needed for these facilities.
7.03. PROGRESS ESTIMATE
For each calendar month of Contract work, the Engineer will prepare a progress estimate of all work performed under the Contract. Within the first ten (10) days of each succeeding calendar month, the Engineer will prepare in writing an estimate which in the Engineer’s opinion is a fair approximation of the value of all work done under the Contract, including any amounts due the Contractor for Extra Work and Change Orders. In arriving at the value of the Work done, the Engineer will give consideration to the value of labor and materials which have been incorporated into the permanent work by the Contractor during the preceding month. Consideration will not be given to preparatory work done or for materials or equipment on hand.
323
Updated 2/17/23
In order to assist the Engineer, the Contractor shall furnish the Engineer with copies of invoices for all such items delivered to the job site.
7.04. PROGRESS PAYMENTS
(a) The City will pay the Contractor ninety-five percent (95%) of the amount of each progress estimate within thirty (30) days after receipt of an undisputed and properly submitted progress estimate from the Contractor, unless the City has made a finding prebid pursuant to Public Contract Code section 7201(b)(4) justifying a larger retention. If the City fails to pay an undisputed progress estimate within the allotted thirty (30) days, the City shall pay interest to the Contractor equivalent to the legal rate set forth in subdivision (A) of section 685.010 of the Code of Civil Procedure. Five percent (5%) of the amount of each estimate shall be retained by the City until final completion and Acceptance of all work under the Contract. (b) Upon receipt of a payment request, the City shall act in accordance with both of the following:
(1) Each payment request shall be reviewed by the City as soon as practicable after receipt for the purpose of determining that the progress estimate is a proper payment request.
(2) Any payment request determined not to be a proper payment request suitable for payment shall be returned to the Contractor as soon as practicable, but not later than seven (7) days, after receipt. A request returned pursuant to this section shall be accompanied by a document setting forth in writing the reasons why the payment request is not proper.
(c) The number of days available to the City to make a payment without incurring interest pursuant to this section shall be reduced by the number of days by which the City exceeds the seven-day return requirement set forth in paragraph (2) of subdivision (b). (d) The Contractor may, in accordance with the provisions of Public Contracts Code section 22300, substitute securities for any monies which the City may withhold to insure performance under the Contract.
(e) When, in the judgment of the Engineer, the Work is not proceeding in accordance with the provisions of the Contract, or when in the Engineer’s judgment the total amount of the Work done since the last estimate amounts to less than one thousand dollars ($1,000.00), no pay estimate will be prepared and no progress payment will be made. (f) No progress estimate or payment shall be considered to be an approval or Acceptance of any work, materials or equipment. Estimated amounts and values of work done and materials and equipment furnished will be conformed with actual amounts and values as they become available in subsequent progress estimates, progress payments and the final estimate and payment. All estimates and payments will be subject to correction in subsequent progress estimates and payments and the final estimate and payment. (g) It is mutually agreed between the parties to the Contract that no payments made under the Contract, including progress payments and the final payment shall be evidence of the performance of the Contract, either wholly or in part, and no payment shall construed to be an Acceptance of any defective or incomplete work or improper materials. 324
Updated 2/17/23
7.05. PROMPT PROGRESS PAYMENT TO SUBCONTRACTORS
A prime Contractor or Subcontractor shall pay any Subcontractor not later than seven (7) days of receipt of each progress payment in accordance with the provisions in Section 7108.5 of the California Business and Professions Code concerning prompt payment to Subcontractors. The seven (7) days is applicable unless a longer period is agreed to in writing.
Any delay or postponement of payment over 30 days may take place only for good cause and with the City’s prior written approval. Any violation of Section 7108.5 shall subject the violating Contractor or Subcontractor to the penalties, sanctions and other remedies of that section. This requirement shall not be construed to limit or impair any contractual, administrative, or judicial remedies otherwise available to the Contractor or Subcontractor in the event of a dispute involving late payment or nonpayment by the prime Contractor , deficient subcontract performance, or noncompliance by a Subcontractor. This provision applies to both DBE and non-DBE Subcontractors.
7.06. LIENS AND STOP NOTICES
The Contractor agrees to keep the Work, the site of the Work and all monies held by the City free and clear of all liens and stop notices related to labor and materials furnished in connection with the Work, if permitted by law. Furthermore, the Contractor waives any right it may have to file any type of lien or stop notice in connection with the Work. Notwithstanding anything to the contrary contained in the Contract Documents, if any such lien or stop notice is filed or there is evidence to believe that lien or stop notice may be filed at any time during the progress of the Work or within the duration of this Contract, the City may refuse to make any payment otherwise due the Contractor or may withhold any payment due the Contractor a sum sufficient in the opinion of the City to pay all obligations and expenses necessary to satisfy such lien or stop notice. The City may withhold such payment unless or until the Contractor, within ten days after demand therefor by the City, shall furnish satisfactory evidence that the indebtedness and any lien or stop notice in respect thereof has been satisfied, discharged and released of record, or that the Contractor has legally caused such lien or stop notice to be released of record pending the resolution of any dispute between the Contractor and any person or persons filing such lien or stop notice. If the Contractor shall fail to furnish such satisfactory evidence within ten days of the demand therefor, the City may discharge such indebtedness and deduct the amount thereof, together with any and all losses, costs and damages suffered or incurred by the City from any sum payable to the Contractor under the Contract Documents, including but not limited to final payment and retained percentage. This section shall be specifically included in all Subcontracts and purchase orders entered into by the Contractor.
7.07. FINAL ACCEPTANCE AND DATE OF COMPLETION
Whenever the Contractor shall deem all Work under this Contract to have been completed in accordance therewith, the Contractor shall so notify the Engineer in writing, and the Engineer shall promptly ascertain whether the Work has been satisfactorily completed and, if not, shall advise the Contractor in detail and in writing of any additional work required. When all the provisions of the Contract have been fully complied with, to the satisfaction of the Engineer, the Engineer shall proceed with all reasonable diligence to determine accurately the total value of all Work performed by the Contractor at the prices set forth in the Contract or fixed by Change Orders, and the total value of all extra work, all in accordance with the Contract.
The Engineer will then certify to said final estimate and to the completion of the Work, and will file copies thereof with the City and the Contractor, and shall cause of Notice of Completion to be filed with the Yolo County Clerk-Recorder . The date of completion shall be the date of filing of the Notice of Completion. All guarantees, warranties, and securities securing said guarantees and warranties, shall commence on said date. 325
Updated 2/17/23
7.08. RIGHT TO WITHHOLD PAYMENTS
(a) In addition to all other rights and remedies of the City hereunder and by virtue of the law, the City may withhold or nullify the whole or any part of any partial or final payment to such extent as may reasonably be necessary to protect the City from loss on account of:
(1) Defective work not remedied, irrespective of when any such work be found to be defective;
(2) Claims or liens filed or reasonable evidence indicating probable filing of claims or liens including, but not limited to claims under Sections 1775, 1776, or 1777.7 of the Labor Code;
(3) Failure of the Contractor to make payments properly for labor, materials, equipment, or other facilities, or to Subcontractors and/or suppliers; (4) A reasonable doubt that the Work can be completed for the balance then unearned;
(5) A reasonable doubt that the Contractor will complete the Work within the agreed time limits;
(6) Costs to the City resulting from failure of the Contractor to complete the Work within the proper time; or
(7) Damage to work or property.
(b) Whenever the City shall, in accordance herewith, withhold any monies otherwise due the Contractor, written notice of the amount withheld and the reasons therefor will be given the Contractor. After the Contractor has corrected the enumerated deficiencies, the City will promptly pay to the Contractor the amount so withheld. When monies are withheld to protect the City against claims or liens of mechanics, material men, Subcontractors, etc., the City may at its discretion permit the Contractor to deliver a surety bond in terms and amount satisfactory to the City, indemnifying the City against any loss or expense, and upon Acceptance thereof by the City, the City shall release to the Contractor monies so withheld.
7.09. FINAL PAYMENT
Within ten (10) days after the date of completion, the City will file in the Office of the County Recorder, a Notice of Completion of the Work herein agreed to be done by the Contractor. Within sixty (60) days of completion defined in Public Contract Code section 7107, the difference between said final estimate and all payments theretofore made to the Contractor shall be due and payable to the Contractor, subject to any requirements concerning the furnishings of a maintenance bond, and excepting only such sum or sums as may be withheld or deducted in accordance with the provisions of this Contract. All prior certifications upon which partial Payments may have been made, being merely estimates, shall be subject to correction in the final certificate.
7.10. FINAL RELEASE
Final payment to the Contractor in accordance with the final estimate is contingent upon the Contractor furnishing the City with a signed written release of all claims against the City arising by virtue of the Contract. Disputed Contract claims in stated amounts may be specifically 326
Updated 2/17/23
excluded by the Contractor from the operation of the release. The release shall be in substantially the form specified in California Civil Code section 8138. 327
1795423.1 7203-038
PART 3 SUPPLEMENTAL CONDITIONS
(SPECIAL PROVISIONS)
328
1795423.1 7203-038
SUPPLEMENTAL CONDITIONS (SPECIAL PROVISIONS)
Except as modified by these Supplemental Conditions, the work shall be performed in accordance with Part 3 General Conditions. The numbering of these Supplemental Conditions coincides to the numbering in the General Conditions. The existence of a section in these Supplemental Conditions means that a corresponding section in the General Conditions is modified in some respect. Under these contract documents, Supplemental Conditions and Special Provisions have the same meaning.
The following Supplemental Conditions , if any, shall be used in conjunction with the City of West Sacramento Standard Specifications current edition including Standard Details and all revisions, and the current State of California Department of Transportation (Caltrans) Standard Specifications, in that order.
The following provisions apply to use of or reference to the Caltrans Standard Specifications:
1. None of the “General Provisions” of the Caltrans Standard Specifications, i.e., Sections 1 through 9, applies to these Contract Documents with the exception of any specific provisions, if any, which are expressly stated to apply to these Contract Documents. The City’s “General Conditions” shall govern.
2. If there is a conflict or inconsistency between any provision in the Caltrans Standard Specifications and a provision of these Contract Documents, the provision in the Contract Documents will govern.
3. Any reference to the “Engineer” in the Caltrans Standard Specifications is deemed to mean “City”, “Owner” or “Architect/Engineer” or Owner’s designated representative.
4. Any reference to the “State” in the Caltrans Standard Specifications is deemed to mean “City” or “Owner.”
City Standard Specifications are available online at:
http://cityofwestsacramento.org/city/depts/comdev/engineering/specs/default.asp Bound hardcopies may be purchased from City Hall at:
1110 West Capitol Avenue, 2nd Floor
West Sacramento, California 95691
or by calling (916) 617-4645 for purchase by mail.
State Standard Specifications are available online at:
http://www.dot.ca.gov/hq/esc/oe/standards.php
329
State Streets Pavement Rehabilitation Project
PART 5 TECHNICAL SPECIFICATIONS
The work shall be performed in accordance with the latest edition of the City of West Sacramento Standard Specifications – Division IV: Standard Construction Specifications and Caltrans Standard Specifications 2022, except as modified by these Technical Specifications.
Section numbering of these Technical Specifications does not conform to the City’s Standard Specifications.
Contractor shall provide submittals (shop drawings) for all materials to be installed or used on the project.
330
State Streets Pavement Rehabilitation Project
331
State Streets Pavement Rehabilitation Project
SECTION 3
EARTHWORK
Replace Section 3 with the following:
3.01 DESCRIPTION
Earthwork shall conform to Section 19 of the State Standard Specifications unless otherwise specified in these specifications.
3.02 GRADE TOLERANCE
Immediately prior to placing subsequent layers of material, the grading plane of the basement material shall not vary more than 0.05 foot above or below the design grade.
3.03 SUBGRADE STABILITY TEST
Density of subgrade shall be determined by Caltrans Standard Specification Section 19.5- Compaction. Compact earthwork to a relative compaction of at least 95% for at least a depth of:
1. 0.5 foot below the grading plan for the width between the outer edges of shoulders
2. 0.5 foot below the finished grade from back of curb to back of curb Perform at least one proof roll of the subgrade per block. If the test does not pass, remove subgrade, use over excavation material, and recompact.
3.04 CLEANING OF STREETS
It shall be the responsibility of the contractor to keep the project site clean, for removing all debris and rubbish from project site daily, and to remove all debris on adjacent public streets, daily or upon request, to the satisfaction of the City Engineer. Every effort shall be made to ensure that adequate measures are taken to prevent material from being deposited on City streets. Contractor may be issued a stop work notice for failure to comply with this requirement.
3.05 EROSION CONTROL
The Contractor is responsible for erosion control before, during, and after construction at the job sites. Such temporary and permanent erosion control shall consist of, but not be limited to installation of Best Management Practices (BMPs) such as waddles, inlet protection, staging area containment, hydroseeding, constructing such facilities, and taking such measures as are necessary to prevent, control, and abate water, mud, and erosion damage to public and private property as a result of the project.
By October 15th of each year, or earlier if conditions warrant, such temporary erosion control features as are necessary to prevent damage during the upcoming winter season shall be constructed and functioning to the satisfaction of the City Engineer.
Mud and silt shall be settled out of storm runoff before said runoff leaves the construction site or enters the City storm drain system, or a natural channel. All drain inlets, which may be affected 332
State Streets Pavement Rehabilitation Project
by mud, silt, or dirt from the project, shall be adequately filtered to the satisfaction of the City Engineer. Contractor may be issued a stop work notice for failure to comply with this requirement.
3.06 CLEARING AND GRUBBING
Clearing and grubbing shall conform to Section 17-2 of the State Standard Specifications except as noted herein. The Contractor is responsible for clearing and grubbing vegetation, minor timber barricades, fences, sign posts, tree roots, and obstructions in the areas of indicated work.
Tree pruning shall be coordinated with the City Inspector and with the City Arborist if directed.
Existing vegetation outside the areas to be cleared and grubbed shall be protected from injury or damage resulting from the Contractor’s operations. Vegetation shall be cleared and grubbed only within the excavation and embankment slope lines. Activities controlled by the Contractor, except cleanup or other required work, shall be confined within the graded areas of the project.
Materials recovered from clearing and grubbing activities, and have been determined by the City Engineer to be salvaged, shall be returned to the City of West Sacramento Corporation Yard located at 1951 South River Road, West Sacramento, CA 95691.
3.07 GEOTECHNICAL
Geotechnical reports and recommendations specific to the project are included in the Appendix.
Other soil testing, compaction testing, etc. shall be the responsibility of the Contractor.
3.08 ROADWAY EXCAVATION
Roadway excavation shall conform to Section 19 of the State Standard Specifications.
There will be areas where the Contractor shall excavate and remove the existing material to a depth below the bottom of the new structural pavement section to accommodate the proposed cross-slopes. Excavation required outside of the 6” HMA removal and regrading shall be included as incidental in the price for other items. Contractor shall stockpile and use over excavation material to repair unstable areas.
Scarify six (6) inches minimum of the exposed subgrade soils below the overexcavation depth, moisture condition, and compact the soils to a minimum of 95 percent of maximum density as determined by Caltrans Test Method 216/231 or ASTM D1557.
Unsuitable material shall be handled per Section 19-1.03B Unsuitable Material of the Caltrans Standard Specifications.
Excavate and dispose of unsuitable material encountered below the natural ground surface in embankment areas or below the grading plane in excavation areas as ordered. Notify the engineer before removing the unsuitable material if:
1. Removal is not otherwise described
2. You request payment for removal as change order work backfill space resulting from excavating unsuitable material with material suitable for the planned use. Place and compact suitable material per section 19-5.
333
State Streets Pavement Rehabilitation Project
3.09 BAT HABITAT ASSESSMENT
The Contractor shall refer to the Bat Habitat Assessment Results Report found in the Appendix.
Mitigation Measure (MM) BIO-2b requires trees rated as 2 to go under a survey for bats for a minimum of 2 nights during maternity season (May 1st to August 31st) if bat roosts are found in any of the trees during the evening survey, MM BIO-2b requires the rating to be changed to 3 and subsequent implementation of MM BIO-2c to avoid and minimize impacts on bats and bat roosts.
3.10 ARBORIST REPORT
The Contractor shall refer to the Arborist Report found in the Appendix.
Roots greater than 4 inches in diameter are usually structural roots. Removal of structural roots may greatly reduce the anchorage of the tree and increase the probability of the tree falling over. Work within the structural root zone should be avoided to the maximum extent possible.
Where avoidance is not possible, damage to tree roots should be minimized.
The following recommendations will help protect trees during construction.
The canopy of retained trees that overhang the work area should be pruned to the minimum height required for construction. Pruning should be conducted by an ISA certified tree worker or arborist in accordance with American National Standard Institute (ANSI) A300 Pruning Standard or adhere to the most recent edition of ANSI Z133.1.
Areas within the critical root zone of retained trees which will not be directly impacted by construction should be avoided. No driving, parking, or storage of equipment or materials should occur within avoided areas of the critical root zone. Entry of construction personnel into the avoidance area should not be allowed except for activities undertaken for the protection of the tree.
Roots should be uncovered using hand tools, air spades, or water spades. After the roots are uncovered, root pruning should be conducted along the limit of work. Roots should be pruned to the same depth, and no more, as adjacent excavation. Roots should be pruned by a method that cuts them cleanly such as a rock saw, vibrating knife, narrow trencher with sharp blades, or hand excavation and sawing. Roots should not be severed with backhoes, excavators, bulldozers, graders, or other rough grading equipment that may pull or shatter tree roots.
Exposed roots should be kept moist to minimize water loss, and the soil should be replaced as quickly as possible. The purpose of root pruning is to remove only those roots that need to be removed to complete construction, without further damaging the root system.
If during project implementation, a root greater than 2 inches diameter is encountered that needs to be cut, the tree should be further evaluated by a certified arborist to determine if the tree should be removed all together to eliminate a falling hazard. 334
State Streets Pavement Rehabilitation Project
SECTION 7
AGGREGATE BASE
The following replaces Section 7:
7.01 DESCRIPTION
Aggregate Base shall conform to Section 26 of the State Standard Specifications. Aggregate base shall be Class 2 with three quarter (3/4) inch maximum gradation. Thickness shown on the plans shall be the minimum section allowed.
Aggregate must be clean and consist or any combination of the following:
1. Broken stone
2. Crushed gravel
3. Natural rough-surfaced gravel
4. Sand
5. Processed reclaimed asphalt concrete, PCC, LCB, or CTB
7.02 CONSTRUCTION
Class II aggregate base shall be placed under the concrete sidewalk parallel/perpendicular/case F curb ramps, rolled curb & gutter, vertical curb & gutter, valley gutter, and all areas called out on the project plans. The finished subgrade shall be compacted to 95% relative compaction, prior to backfilling with Class 2 aggregate base. If subgrade cannot reach 95% relative compaction, the native soil shall be replaced with Class II aggregate base as required by the City Engineer. The finished grade immediately prior to placement of hot mix asphalt or concrete shall be compacted to 95% relative compaction. Relative compaction shall be tested under Caltrans Standard Testing Methods.
7.03 MEASUREMENT AND PAYMENT
Full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in providing and placing aggregate base, as shown on the plans, as specified in these Special Provisions, and as directed by the Engineer shall be considered as included in the contract prices paid for various contract items of work involved and no additional compensation will be allowed therefor.
SECTION 8
HOT MIX ASPHALT, SLURRY SEAL, AND TACK COAT
The following replaces Section 8:
335
State Streets Pavement Rehabilitation Project
8.01 HOT MIX ASPHALT
DESCRIPTION
All work shall conform to Section 39-2 of the State Standard Specifications. This work includes producing and placing hot mix asphalt (HMA) Type A. The aggregate for HMA Type A must comply with the ½-inch grading. The asphalt binder type shall be PG 64-10 Items not addressed by these Specifications shall comply with Section 39, “Hot Mix Asphalt” of the State Standard Specifications.
Hot mix asphalt shall be produced and placed following the State Standard specifications.
Use of reclaimed asphalt concrete shall conform to Section 30 of the State Standard Specifications.
HMA shall be spread in equal thicknesses according to the following:
Section Lift
0.15 ft - 0.25 ft Top Layer Thickness
0.15 ft - 0.25 ft Next Lower Layer Thickness
0.15 ft - 0.40ft All Other Lower Layer Thickness
Existing asphalt concrete surface shall be sawcut vertically in a neat straight line parallel with the travel lane or utility main and services where applicable, and the exposed edge shall be cleaned and tacked with emulsion prior to paving.
HMA shall be spread and compacted in layers. The top layer of HMA shall be a minimum of
0.15 foot in compacted thickness.
PENETRATION TREATMENT, SEAL, AND TACK COATS
Tack coats shall be penetration type emulsion conforming to Section 39 and 94 of the State Standard Specifications. Tack coat shall be homogeneous asphaltic emulsion type SS1h and shall be applied at a rate of 0.20 gallons per square yard of surface covered. A tack coat shall be required at all locations where concrete meets asphalt concrete and between asphalt concrete lifts and vertical sawcut surfaces of existing pavement, curbs, gutters, and construction joints in the surfacing against which additional material is to be placed, to a pavement to be surfaced, and to other surfaces designated by the Engineer.
Performance graded (PG) asphalt binder shall be PG 64-10 and shall conform to Section 92 “Asphalt Binders” of the State Standard Specifications.
ASPHALT EMULSION
The emulsified asphalt shall be designated as grade PMCQS-1h. The polymer within the asphalt emulsion shall be, at the option of the Contractor, either Neoprene, SBR, EVA or SBS.
Solid polymers such as EVA or SBS shall be adequately blended into the asphalt prior to emulsification. If a liquid latex such as Neoprene, SBR or similar is used, the latex shall be “comilled” into the emulsion through the water phase during manufacturing. Each load of polymer asphaltic emulsion shall have a certificate from the asphalt emulsion manufacturer guaranteeing 336
State Streets Pavement Rehabilitation Project
that either asphalt blending or “co-milling” processes were used. The certificate shall also state the percentage of the solid rubber polymer added by weight of the asphalt as well as the composition of the polymer. The addition of latex to the emulsion after emulsion manufacturing is prohibited.
The polymer modified asphalt emulsion shall conform to the following specifications:
Test Test Method Requirement
Min Max
Tests on Emulsion:
• Viscosity, SSF, @ 77°F, seconds AASHTO T 59 15 90
• Settlement, 5 days, % AASHTO T 59 --- 5
• Storage Stability Test, 1 day, % AASHTO T 59 --- 1.0
• Distillation: Oil Distillate by Volume of
Emulsion, % AASHTO T 59 --- 3
• Residue by Low-Temperature Vacuum
Distillation, %
ASTM D244.
133-137 62 ---
Tests on Residue Using CTM 331
• Penetration, 77°F, 100 grams for 5 seconds,
mm
AASHTO T 49 40 60
• Solubility in Trichloroethylene, % ASTM D 2042 97.5 --- • Ductility, 77°F, 5cm/min, cm (RTFO aged
residue) AASHTO T 51 60 ---
• Polymer Content, %,
Solid polymer content based on weight of
asphalt.
CTM 401 4.0% ---
• Torsional Recovery, % CTM 332 18 ---
ADJUSTMENT OF IRON
Adjustment of iron shall conform to Section 10 of the City Standard Specifications and Details.
All castings for City owned and maintained facilities shall be brought to finished grade after placement of the final pavement lift. All iron shall be lowered prior to any pavement planning or grinding.
MIX DESIGN
Contractor shall submit to the Engineer a current copy of the mix design for approval from the Hot Mix Asphalt suppliers prior to any paving. The mix design shall be a current mix design approved by Caltrans and should include the following:
Mix design documentation on Contractor Hot Mix Asphalt Design Data shall include source of plant, grade of asphalt (PG 64-10), lab unit weight, percent of asphalt, aggregate gradation, stability and percent of air voids. The mix design shall be certified by the supplier.
Submittal:Submit a valid Job Mix Formula (JMF) that meets the requirements stipulated in Section 39 State Standard Specifications. Materials delivered to the project shall have a Certificate of Compliance with the approved JMF number and associated weight ticked for material delivery.
SPREADING AND COMPACTION EQUIPMENT
337
State Streets Pavement Rehabilitation Project
After compaction, the asphalt concrete shall have a density of not less than 95 percent of the relative compaction of the Laboratory Tested Maximum Density (LTMD), as determined in the field by California Test Method 375 or in a method as approved by the City Engineer.
Spreading and compacting equipment shall be as specified in Section 39-2 of the State Standard Specifications. In addition, pneumatic-tired rollers shall be required to be used on all types of asphalt concrete paving unless otherwise approved by the City Engineer. The Contractor shall furnish a sufficient number of rollers to obtain the specified compaction and surface finish required by these specifications.
All rollers shall be equipped with pads and water systems which prevent sticking of asphalt mixtures to the pneumatic- or steel-tired wheels. A parting agent, which will not damage the asphalt mixture, as determined by the Engineer, may be used to aid in preventing the sticking of the mixture to the wheels. Asphalt concrete and asphalt concrete base shall be compacted by any means to obtain the specified relative compaction before the temperature of the mixture drops below 150°F. Additional rolling to achieve the specified relative compaction will not be permitted after the temperature of the mixture drops below 150°F or once the pavement is opened to public traffic. When vibratory rollers are used as finish rollers the vibratory unit shall be turned off.
If the test results for any lot of asphalt concrete indicate that the relative compaction is below
95.0 percent, the Contractor will be advised that he is not attaining the required relative compaction and that his materials or his procedures, or both, need adjustment. Asphalt concrete spreading operations shall not continue until the Contractor has notified the Engineer of the adjustment that will be made in order to meet the required compaction. The test results for any lot of asphalt concrete indicate that the relative compaction is less than 93.0 percent, the asphalt concrete represented by that lot shall be removed, except as otherwise provided below.
Asphalt concrete spreading operations shall not continue until the Contractor makes significant adjustments to his materials or procedures or both in order to meet the required compaction.
The adjustments shall be as agreed to by the Engineer. However, if requested by the Contractor and approved by the Engineer, asphalt concrete or asphalt concrete base with a relative compaction of 89 percent or greater may remain in place and the Contractor shall pay to the City an amount of reduced compensation for such lot with low compaction. The City may deduct the amount of reduced compensation from any monies due, or that may become due, the Contractor under the contract. The amount of reduced compensation the Contractor shall pay to the City will be calculated using the total tons represented in the lot with low compaction times the contract price per ton for the contract item of asphalt concrete involved times the reduced compensation factors per Section 39-2 of the State Standard Specifications.
Care shall be exercised to avoid raking and spreading asphalt concrete at joints; instead, asphalt concrete shall be pulled back and formed a ridge for rolling by compacting equipment.
The area to which paint binder has been applied shall be closed to public traffic. Care shall be taken to avoid tracking binder material onto existing pavement surfaces beyond the limits of construction.
PAVEMENT STRUCTURAL SECTION
Where the existing pavement is to be reconstructed by constructing a new pavement structural section adjacent to the existing pavement, the edge of the existing pavement section shall be saw-cut on a neat line down to the bottom of the existing pavement, prior to excavation and placement of new full pavement structural section as shown on the plans. All patch backs shall be completed by 2” T-Grind and completed within (5) five days of removing pavement. 338
State Streets Pavement Rehabilitation Project
Full pavement structural section shall be considered as included in the price for other items and no additional compensation will be allowed therefore.
Preparation of roadway, concrete curb, gutter, sidewalk, and driveways, including saw cut, excavation, fill, and disposing existing materials shall be considered as incidental to the Contract unit prices for other items and no additional compensation will be allowed therefore.
MEASUREMENT AND PAYMENT
Payment of hot mix asphalt includes full compensation for furnishing all labor, materials, tools, equipment, and incidentals for performing all work involved in placing asphalt concrete (Type A, 1/2” and ¾” aggregate). HMA to be placed in three, two- inch lifts with the two bottom lifts to be Type A, ¾” maximum aggregate, asphalt concrete and the top lift to be Type A, ½” maximum aggregate, asphalt concrete. This item shall include placing hot mix asphalt at areas where pavement was sawcut and removed for installation, hand working around existing appurtenances or obstructions, adjustment of castings, tack coat, temporary pavement delineation, temporary tapers, and hot mix asphalt required for placement of speed humps.
Measurement of payment shall be based on the weight tickets provided by the Contractor to the City Inspector in TON. All work shall conform to the City Standard Specifications, the State Standard Specifications, these Special Provisions, and as directed by the City Engineer. There shall be no payment adjustments for asphalt price index fluctuations.
Measurement of payment installing speed humps shall be per EACH (EA) as shown in the plans.
All work shall conform to the City Standard Specifications, the State Standard Specifications, these Special Provisions, and as directed by the City Engineer.
8.02 SLURRY SEAL
GENERAL
Slurry seal shall be a Polymer Modified Fiberized TYPE II conforming to these Special Provisions.
Polymer Modified Fiberized slurry shall consist of mixing a polymer modified cationic quickset emulsion, glass fibers, aggregate, mineral filler, set-control additives, and water and spreading the mixture on a pavement surface where shown on the plans, in conformance with the provisions in these special provisions, and as directed by the Engineer.
The fibers shall be added by means of automatic injection into the slurry pug-mill at a consistent length and application rate which is adjustable to meet the approval of the Engineer.
MATERIAL
The material for fiberized slurry shall conform to the following requirements:
Fiberized Emulsion
The asphalt emulsion for fiberized shall be a polymer modified cationic quickset (PMCQS-1h), shall be homogenous and shall conform to the provisions of these special provisions. The polymer shall be milled or blended into the asphalt or blended into the emulsifier solution prior to the emulsification process. Polymer solids must be a minimum of 4.0 % by weight of the emulsion’s residual asphalt. Provide a certificate of compliance certifying the amount of polymer. 339
State Streets Pavement Rehabilitation Project
The PMCQS-1h emulsion shall conform to the following requirements when tested in conformance with the following test methods:
Polymer Modified, Cationic Quickset Emulsion
Specification Designation Test Method Requirement
Viscosity SSF @ 77°F (25°C) AASHTO T 59 15-90 Seconds
Sieve, max. AASHTO T 59 0.30 Percent
Settlement, 5 days, max.* ASTM D 244 5 Percent
Residue by Evaporation, min. AASHTO T59 62 Percent
*Waived if to be used within 48 hours of manufacture.
Specification Designation for Residue
Specification Designation Test Method Requirement
Penetration @ 77°F (25°C), 100g, 5s ,0.1mm AASHTO T 51 40-90 Softening Point °F (°C) min. AASHTO T 53 135 (57)
Torsional Recovery min. California Test 332 20
The polymer used in the slurry seal shall be compatible with the polymer used in the polymer modified asphalt rubber chip seal used for this project.
Fiber
The fiber used in the fiberized slurry shall be RoadChem Fiber 1 or equivalent chemical resistant glass fiber meeting the following specifications. It shall be cut to 3/8 +/- 1/8 inch in length prior to adding to the PMCQS-1h emulsion. The fiber shall be added at a rate of 0.15 % -
0.4 % by dry weight of aggregate for bottom lifts and 0.05 % - 0.30 % by dry weight of aggregate for surface lifts. The fiber shall meet the following requirements:
Alkali and Acid Resistant Glass Fiber
Linear Weight of
Roving (tex)
ISO 1889
Linear Weight
of Strand (tex)
ISO 1889
Moisture
Content (%)
ISO 3344
Specific
Gravity
Softening
Point (ºC)
Tensile
Strength
(MPa)
2500 min. 82 min.
340
State Streets Pavement Rehabilitation Project
4800 min. 100 min. 0.35 max. 2.68 g/cm3 860 min. 1700 min.
Water and Additives
The water shall be potable and free of harmful soluble salts or reactive chemicals and other contaminants. If necessary for workability, a set-control agent may be used and must be included as part of the mix design and be compatible with the other components of the mix.
Mineral Filler
Mineral filler shall be Portland cement or hydrated lime that is free of lumps. The type of mineral filler shall be determined by the Contractor based on laboratory mix designs and will be considered part of the aggregate gradation.
Aggregate
The aggregate for slurry seal shall be Type II, 100% crushed with no rounded particles, volcanic in origin and black in color. The use of gray or light-colored aggregate will not be allowed. The aggregate used shall be of the type and grade specified for the particular use of the fiberized slurry. Aggregate shall consist of sound, durable, crushed stone or crushed gravel and approved mineral filler. The material shall be free from vegetable matter and other deleterious substances. All aggregate shall be free of caked lumps and oversize particles.
The aggregate, prior to the addition of emulsion, shall conform to the requirements of this section. If aggregates are blended each component aggregate shall meet the sand equivalency and abrasion resistance and shall be 100% crushed.
The percentage composition by weight of the aggregate (including mineral filler) shall conform to the following grading requirements when tested in conformance with AASHTO T 27 and AASHTO T 11:
Type II
Sieve Size Percentage Passing
3/8" 100
No. 4 94-100
No. 8 65-90
No. 16 40-70
No. 30 25-50
No. 200 5-15
The aggregate (excluding mineral filler) shall conform to the following quality requirements:
341
State Streets Pavement Rehabilitation Project
Test Test Method Requirements
Sand Equivalent (Min.) AASHTO T 176 65
Durability Index (Min.) AASHTO T 210 60
Percentage of Crushed Particles (Min.) ASTM D 5821 100% Loss Angeles Rattler
AASHTO T 96 35%
Loss at 500 Rev. (Max.)1
Notes: 1. Los Angeles Rattler shall be performed on the parent aggregate before crushing If the results of the aggregate grading or Sand Equivalent tests do not meet the specified requirement, the fiberized slurry represented by the test shall be removed and replaced at the Contractor’s expense.
No single aggregate grading or Sand Equivalent test shall represent more than 300 tons or one day’s production, whichever is smaller.
MIX DESIGN
At least 7 working days before the fiberized slurry placement commences, the Contractor shall submit for approval of the Engineer a laboratory report of tests and a proposed mix design covering the specific materials proposed for use on the project. Materials delivered to the project shall have a Certificate of Compliance with the approved mix design number. It is the responsibility of the contractor to secure a location for stockpiling of screenings. The City may assist with providing a City owned location nearby if available.
The percentages of each individual material proposed in the mix design shall be shown in the laboratory report. Individual materials shall be within the following limits:
Residual Asphalt 5.5% to 10.5% by dry weight of aggregate Mineral Filler 0.5% to 3% by dry weight of aggregate
342
State Streets Pavement Rehabilitation Project
Glass Fiber
Top Lift: 0.05% to 0.30% by dry weight of aggregate
Bottom Lift: 0.15% to 0.40% by dry weight of aggregate
Additive and Water As needed
Adjustments may be required during construction based on field conditions.
The mix design and aggregate tests shall be performed by a laboratory capable of performing the applicable International Slurry Surfacing Association (ISSA) tests. The proposed fiberized slurry mixture shall conform to the specified requirements when tested in conformance with the following tests:
Test ISSA Test Method Requirements
Wet Cohesion
@ 30 Minute (Set) (Min.)
@ 60 Minute (Traffic) (Min.)
TB*139 12 kg-cm
20 kg-cm
Excess Asphalt TB*109 540 g/m2
Wet Stripping (Min.) TB* 114 90%
Wet Track Abrasion 6-day Soak Loss TB*100 810g/m2
Displacement
Lateral (Max.)
Specific Gravity After 1000 Cycles of 125
TB*147A 5%
2.10 lbs. (56.8 kg) (Max.)
Classification Compatibility TB* 144 (AAA, BAA) 11 Grade Points Mix Time @ 77°F (25°C) TB* 113 Controllable to 120 Seconds TB* = Technical Bulletin
The laboratory that performed the tests and designed the mixture shall sign the laboratory report and shall be AMRL certified and/or participate in the AASHTO Proficiency Program. The report shall show the results of the tests on individual materials and shall compare their values to those required by these special provisions. The report shall clearly show the proportions of aggregate, fiber, filler (minimum and maximum), water (minimum and maximum), set control additive, and PMCQS-1h solids content (minimum and maximum) based on the dry weight of aggregate. The 343
State Streets Pavement Rehabilitation Project
laboratory shall report the quantitative effects of moisture content on the unit weight of the aggregate (bulking effect) in conformance with the requirements of ASTM Designation C 29M.
Previous laboratory reports covering the same materials may be accepted provided the material test reports were completed within the previous 12 months.
The component materials used in the mix design shall be representative of the fiberized slurry materials proposed by the Contractor for use on the project.
Once the mix design is approved by the Engineer, no substitution of other material will be permitted unless the materials proposed for substitution are first tested and a laboratory report is submitted for the substituted design in conformance with the provisions of these special provisions. Substituted materials shall not be used until the mix design for those materials has been approved by the Engineer.
The completed mixture, after addition of water and set control agent, if used, shall be such that the fiberized slurry mixture has proper workability. At the expiration of the road closure hours, the fiberized slurry mixture shall be sufficiently cured to support unrestricted traffic.
PROPORTIONING
Aggregate, mineral filler, PMCQS-1h, fiber, water, and additives, including the set-control agent, if used, shall be proportioned by volume utilizing the mix design approved by the Engineer. If more than one kind of aggregate is used, the correct amount of each kind of aggregate to produce the required grading shall be proportioned separately, prior to adding the other materials of the mixture, in a manner that will result in a uniform and homogeneous blend.
The aggregate shall be proportioned using a belt feeder operated with an adjustable cut off gate.
The height of the gate opening shall be determinable. The PMCQS-1h shall be proportioned by a positive displacement pump. Variable rate emulsion pumps, if used, shall be calibrated and sealed in the pump’s calibrated condition in conformance with the ISSA Inspector’s Manual MA-1 prior to usage.
The delivery rate of aggregate and PMCQS-1h per revolution of the aggregate feeder shall be calibrated at the appropriate gate settings for each mixer-spreader truck used on the project in conformance with ISSA Inspector’s Manual MA-1 and in conformance with the provisions of these special provisions.
The aggregate belt feeder shall deliver aggregate to the pug-mill with such volumetric consistency that the deviation for any individual aggregate delivery rate check-run shall not exceed 2.0 percent of the mathematical average of 3 runs of at least three tons each. The emulsion pump shall deliver PMCQS-1h to the pug-mill with such volumetric consistency that the deviation for any individual delivery rate check-run shall be within 2.0 percent of the mathematical average of 3 runs of at least 300 gallons each. The water pump shall deliver water to the pug-mill with such volumetric consistency that the deviation for any individual delivery rate check-run shall be within 2.0 percent of the mathematical average of 3 runs of at least 300 gallons each.
The PMCQS-1h storage tank shall be located immediately before the emulsion pump and shall be equipped with a device which will automatically shut down the power to the emulsion pump and aggregate belt feeder when the PMCQS-1h level is lowered to a point where the pump suction line is exposed.
A temperature-indicating device shall be installed in the emulsion storage tank at the pump suction level. The device shall indicate the temperature of the PMCQS-1h and shall be accurate to within 10°F.
The fiber shall be added at a rate of 0.05 to 0.40% by weight of dry aggregate. The mixer- spreader trucks shall be equipped with a fiber chopper, fiber storage and control systems for injecting fibers into the slurry mix. It shall be capable of providing up to 7 lbs./min. of fiber injection. The chopper shall cut from 3 to 4 bobbins of fiber into 3/8 +/- 1/8-inch-long pieces and feed them into the 344
State Streets Pavement Rehabilitation Project
aggregate as it enters the inlet hopper. The system shall turn on and off with the main start of the mixer-spreader truck. The system shall be powered by the main hydraulic system of the mixerspreader truck. The mixer-spreader truck shall be capable of providing 3-5 cu.ft./min. of air from the truck air compressor for nozzle cooling and chopper flushing. The mixer-spreader truck shall include an enclosure/mounting and feed system for up to 4 bobbins of fiber roving.
The belt delivering the aggregate to the pug-mill shall be equipped with a device to monitor the depth of aggregate being delivered to the pug-mill. The device for monitoring the depth of aggregate shall automatically shut down the power to the aggregate belt feeder whenever the depth of aggregate is less than the target depth of flow. A second device shall be located where the device will monitor the movement of the aggregate belt by detecting revolutions of the belt feeder. The devices for monitoring no flow or belt movement shall automatically shut down the power to the aggregate belt when the aggregate belt movement is interrupted. The device to detect revolutions of the belt feeder will not be required where the aggregate delivery belt is an integral part of the drive chain. To avoid erroneous shutdown by normal fluctuation, a delay of 3 seconds will be permitted between sensing and shutdown of the operation.
MIXING AND SPREADING EQUIPMENT
The fiberized slurry shall be mixed in continuous pug-mill mixers of adequate size and power for the type of fiberized slurry to be placed. All indicators shall be in conformance with the provisions of these special provisions and shall be in working order prior to commencing mixing and spreading operations.
Mixer-spreader trucks shall be equipped to proportion the PMCQS-1h, water, aggregate, mineral filler, and set-control additives by volume. Rotating and reciprocating equipment on mixerspreader trucks shall be covered with metal guards.
The mixer-spreader truck shall not be operated unless low-flow and no-flow devices and revolution counters are in good working condition and functioning and metal guards are in place.
Indicators required by these special provisions shall be visible while walking alongside the mixerspreader truck. Slurry application equipment shall be calibrated prior to start of work. Contractor shall notify Engineer 48 hours in advance of the time of scheduled equipment calibration.
Aggregate feeders shall be connected directly to the drive on the emulsion pump. The drive shaft of the aggregate feeder shall be equipped with a revolution counter reading to the nearest onetenth of a revolution.
In addition to the requirements of Section 5 1.33, “Equipment,” of the Standard Specifications, the identifying number of mixer-spreader trucks shall be at least three inches in height, located on the front and rear of the vehicle.
The fiberized slurry mixture shall be spread by means of a spreader box conforming to the requirements in the “Spreader Box” section of these specifications.
Spreader Box
For Type II fiberized slurry the spreader box shall be capable of spreading a lane width and equipped with a material such as flexible rubber belting on each side and in contact with the pavement. If the spread width is wider than 7.5 feet, a spreader box shall be equipped with a means, such as baffles or reversible motor-driven augers, to uniformly apply slurry on super elevated sections and shoulder slopes. The spreader box shall be equipped with rear flexible strike-off blades making close contact with the pavement and adjustable to various crown shapes in order to apply a uniform slurry. The spreader box shall be equipped with flexible drags attached to the rear and cleaned daily and changed if longitudinal scouring occurs. The spreader box shall be clean and free of excess slurry and/or PMCQS-1h at the start of each work shift. 345
State Streets Pavement Rehabilitation Project
PREPARATION FOR PLACEMENT
Before placing the fiberized slurry, the pavement surface shall be cleaned by sweeping, flushing or by other means necessary to remove loose particles of paving, dirt, and other extraneous material. When required, the roadway surface may be fogged with water ahead of the spreader box. The application of the fog spray may be adjusted to suit temperatures, surface texture, humidity, and dryness of pavement.
Surface Preparation. Four weeks prior to seal coat application, the Contractor shall sterilize all areas that show evidence of weed growth with an approved soil sterilant. Contractor is also responsible for trimming any street trees that will obstruct proper equipment operations.
All cracks wider than 1/4 inch in the pavement surface shall be crack sealed with a compatible polymer sealant. Cracks shall be thoroughly cleansed by lancing and blowing with compressed air or other approved method. The surface of the sealed crack shall be applied and finished flushed with the surrounding pavement surface.
Holes, depressions, and large cracks wider than 1/2 inch, not marked for pavement repair shall be thoroughly cleansed, tack coated and patched with Minor HMA, 3/8-inch maximum aggregate and compacted.
Prior to applying the seal treatment, the pavement surface shall be cleared of all loose material, oil spots, vegetation, and other objectionable materials or defects within the work area limits.
Cleaning may include sweeping with a power broom, a light scuffing with a grinder, or other approved method. If water is used, the pavement surface shall be allowed to dry thoroughly.
Manholes, water valves, air relief vaults, monuments, drop inlets and other service entrances shall be protected by a suitable method and restored prior to opening to traffic.
All existing thermoplastic striping, markings, pavement markers, or other surface items shall be removed prior to seal coat application.
A tack coat of asphaltic emulsion shall be applied to all Portland cement concrete surfaces when there is a contract item for the work or when the work is required in these special provisions. The asphaltic emulsion for tack coat shall be grade SS-1, SS-1h, CSS-1 or CSS-1h and shall conform to the provisions in Section 94, “Asphaltic Emulsions,” of the Standard Specifications. The asphaltic emulsion shall be mixed in the proportion of one part of emulsion (which contains up to 43 percent water) to 3 parts water. The mixture shall be applied at the approximate rate of 0.04 –
0.08 gal/yd2. When asphaltic emulsion is used as a tack coat, fiberized slurry shall not be placed until the asphaltic emulsion has cured.
PLACEMENT OF SLURRY
The fiberized slurry mixture shall be uniformly spread on the existing surface within the rate specified without spotting, re-handling or otherwise shifting of the mixture.
The fiberized slurry mixture shall not be placed when the ambient temperature is below 50 °F or during unsuitable weather. Fiberized slurry shall not be placed if rain is imminent or if there is the possibility that there will be freezing temperatures within 24 hours.
Fiberized slurry shall be spread at a rate within the following ranges of pound of dry aggregate per square yard:
346
State Streets Pavement Rehabilitation Project
Fiberized Slurry Type Location Spread Rate (lbs. agg./sq.yd.) Type II Full Traffic Width 16-18
The minimum spread rate is 16 lbs. of dry aggregate per square yard.
Longitudinal joints shall correspond with the edges of the traffic lanes. The Engineer may permit other patterns of longitudinal joints if the patterns will not adversely affect the quality of the finished product.
Through traffic lanes shall be spread in full lane widths only. Longitudinal joints common to 2 traffic lanes shall be (butt joints) with overlaps not to exceed 3 inches. Building paper shall be placed at the transverse joints to avoid double placement of the fiberized slurry. Other suitable methods to avoid double placement of the fiberized slurry will be allowed. Hand tools shall be available to remove spillage.
The mixture shall be uniform and homogeneous after placing on the surfacing and shall not show separation of the PMCQS-1h and aggregate after setting. The completed surface shall be of uniform texture and free from ruts, humps, depressions, or irregularities.
Adequate means shall be provided to protect the fiberized slurry from damage by traffic until such time that the mixture has cured sufficiently so that the fiberized slurry will not adhere to or be picked up by the tires of vehicles.
When placing multiple layers of fiberized slurry, the second layer shall not be placed until the following day or later.
After the initial break of the fiberized slurry and within a minimum of 2 hours and a maximum of 4 hours after placement the fiberized slurry shall be rolled with a pneumatic tire roller meeting the following requirements:
1. 9.3 tons minimum weight
2. The roller shall be equipped with 7 total wheels, 4 in the rear and 3 in the front of the roller.
The roller shall make a minimum of three passes on the surface.
The Polymer Modified Fiberized slurry seal shall be traffic ready within 60 minutes of being applied to roadway surface. The term “Traffic Ready” means allowing uncontrolled traffic on the roadway surface.
Placement of the fiberized slurry shall cease a minimum of one hour before the expiration of the road closure hours as specified in these special provisions, unless the Contractor proves to the satisfaction of the Engineer that the surface will be ready for unrestricted traffic at the expiration of the road closure hours.
REPAIR OF EARLY DISTRESS
If bleeding, raveling, delamination, rutting, or wash boarding occurs within 60 days after placing the fiberized slurry, the Contractor shall diligently pursue repairs by any method approved by the Engineer. The Contractor shall not be relieved from maintenance until repairs have been completed.
FINISHING OPERATIONS
347
State Streets Pavement Rehabilitation Project
Contractor shall be careful in properly applying slurry to the intended road surface. Slurry placed more than 1.5” inch beyond the lip of gutter, if directed by the Engineer, shall be thoroughly removed at the contractor’s expense.
A final sweep picking up all loosened materials shall take place 30 days after application of the slurry seal. A working day will not be charged for this final sweep; however, retention will be withheld until complete.
MEASUREMENT AND PAYMENT
Payment of slurry seal shall be measured and payment made per square yard. The bid price paid shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in constructing the slurry, complete in place, including testing for the furnished mix design, cleaning/preparing the surface, weed removal and sterilization, crack sealing, furnishing added water and set-control additives, mixing water with asphalt emulsion for coating the pavement, finishing operations, protecting the slurry until it has set, and additional sweepings all as shown on the plans, and as specified in these special provisions, and as directed by the engineer and no additional compensation will be allowed therefore.
8.03 TACK COAT GENERAL
Tack coat shall be required at all locations where concrete meets asphalt concrete and between asphalt concrete lifts when time between placement of lifts exceeds 12 hours. Tack coat shall conform to the provisions in Section 39-1.02B of the State Standard Specifications.
MEASUREMENT AND PAYMENT
Full compensation for furnishing all labor, materials, tools, equipment, and incidentals for doing all work in this section shall be considered as included in the contract unit price for various items of work and no additional compensation will be allowed therefore.
SECTION 10
ADJUSTMENT OF CASTINGS
The following replaces Section 10:
10.01 DESCRIPTION
This work shall consist of adjusting castings, for City-owned facilities to conform with the new elevation of the street and in conformance with the Standard Specifications and Details.
10.02 ADJUSTMENT
All castings for City-owned facilities shall be brought to finish grade after the final pavement lift has been installed. The manhole openings shall be temporarily covered by suitable means. For street reconstructions or asphalt repairs on existing streets, manholes and valves shall be raised and concrete placed within three working days after permanent pavement wearing course has been placed. The necessary portions of the subgrade, base and pavement shall be neatly cut away, the manhole built up, and the frames set to a grade flush with the surface of the 348
State Streets Pavement Rehabilitation Project
adjacent pavement. The surrounding area from which the pavement, base or subgrade has been removed shall be backfilled to within 2 inches of the surface. The remaining 2 inches shall be paved with ½ inch maximum asphalt concrete and compacted with a 3-ton pneumatic steel drum roller. The work shall be performed so as to present a neat and thorough workmanlike appearance upon completion.
In addition to City-owned facilities, the contractor will adjust casting for not City-owned utilities if the utility owner has agreed to allow the contractor to adjust the castings that have been identified as potential impacted on the plans. Utility castings located in areas were Portland Cement Concrete will be used must be adjusted to finish grade prior to pouring concrete and should be flush with the finish concrete surface.
10.03 MEASUREMENT AND PAYMENT
Unless specifically shown as an item of work on the proposal form, the adjustment of castings shall be considered included in other items of work and no additional compensation will be made for labor, materials or equipment needed.
SECTION 11
CONCRETE CURB, GUTTER, SIDEWALK AND DRIVEWAYS
The following replaces Section 11:
11.01. DESCRIPTION
Work shall conform with the City Standard Specifications and Section 73 and Section 90 of the State Standard Specifications with the following additions. All concrete work including curb ramps, curb, gutter, valley gutter, driveways, walkways, shall be constructed of Portland cement minor concrete. Minor Concrete shall contain not less than six (6) sacks (564 pounds) of Portland Cement per cubic yard and shall have a maximum aggregate size of three quarter inch (3/4”).
PERCENT PASSING PRIMARY AGGREGATE NOMINAL SIZE
Sieve Size
1” x NO. 4
Operating Range Contract Compliance
1” 88-100 86-100
¾ ” X +/- 15 X +/- 22
½ ”
The symbol X is the gradation that the Contractor proposes to furnish.
Calcium Chloride shall not be added to concrete. All concrete shall be delivered in transit mixers with agitating drums. Non-agitating transport equipment will not be allowed.
Where the removal and replacement of existing curb ramp, curb, gutter, valley gutter, sidewalk, walkway, and driveway exists, the existing section shall be cut to the full depth of of the 349
State Streets Pavement Rehabilitation Project
concrete with a concrete saw. The cut shall be at the nearest joint at or beyond the excavation, full or half panels only. Remove and replace shall not exceed a maximum length of 4 feet beyond excavation. Also the cut shall be vertical and parallel to the adjacent scored or joint line so the visible edge of the remaining concrete shall form a neat, straight line. The Contractor shall be responsible for the proper disposal of excavated concrete and/or asphalt concrete.
11.02. INSTALLATION
Take note of Section 5.12 Public Convenience of these Special Provisions. Existing concrete to be replaced shall be re-constructed within five (5) calendar days following demolition. Prior to start of work, Contractor shall demonstrate to Engineer he has coordinated and provided for access to emergency vehicles and businesses affected by this work. Engineer may issue a stop work notice if Contractor is unable to maintain public access per these Specifications and no additional compensation shall be granted.
A. Subgrade Preparation
The finished subgrade immediately prior to placement of aggregate base shall be compacted to 95% relative compaction for a depth of 0.5 feet. If directed by Engineer, non-suitable subgrade shall be replaced with Class 2 AB compacted to 95% relative compaction.
Prior to the start of any work, the existing area shall be cleaned of all dirt, trees, tree roots, tree stumps, fences, planter, lawn and other growth and extraneous material to the limits of the proposed sidewalk. Three days prior to starting grading for the sidewalk, the Contractor shall sterilize all areas that show evidence of weed growth with soil sterilant.
Clearing and grubbing for new concrete sidewalk, shall conform to the provisions in these Special Provisions. Vegetation shall be cleared and grubbed only within the excavation. Existing vegetation outside the areas to be cleared and grubbed shall be protected from injury or damage resulting from the Contractor's operations. Activities controlled by the Contractor, except cleanup or other required work, shall be confined within the graded areas of the project.
Preparation of existing areas for proposed sidewalk, ramps or other improvement construction, including removing and replacement of existing lawn and relocation of minor signage and irrigation system, as noted on the plans, shall be considered as included in the contract unit price paid with no additional compensation allowed therefore.
B. Base
Shall be Class 2 Aggregate Base mechanically compacted to 95% relative compaction.
C. Extruded Sidewalk, Curb and Gutter
Use of an extrusion machine is allowed. A test pour may be required by the City Engineer prior to approval.
350
State Streets Pavement Rehabilitation Project
D. Placing and Finishing
No concrete shall be placed or finished in the rain or under freezing conditions. It shall be the Contractor’s responsibility to schedule his operations such that concrete will not be placed or finished in the rain or under freezing conditions.
Contractor must provide scoring pattern details for sidewalk to city engineer for approval prior to construction.
At the end of each day’s pour, when work is terminated, or when a delay of more than 30 minutes occurs, the joint shall be made vertical and square ended with 12 inch lengths of #4 reinforcement bar embedded at 18 inch centers.
When a concrete pour terminates at existing concrete, the rebar, as described above, shall be retrofitted by coring or drilling existing concrete (minimum of 4 inches,) installing bars, and filling annular voids with epoxy. Existing concrete shall be removed to the nearest deep joint or score mark.
Weakened plane joints shall be constructed according to the Standard Details.
Expansion joint material shall not be used.
Deep tool joints shall be constructed to a depth of 1-1/2 inches.
A. Concrete Paving
Construct concrete paving with thickened edges in accordance with American Concrete Institute (ACI) design standards, latest edition. Provide No. 3 reinforcement bars placed on maximum 24-inch centers each way throughout the slab. Reinforcement must be located at mid slab depth to be effective. Joint Spacing and details should conform to the current PCA or ACI guidelines.
B. Retaining Curb
Construction of retaining curb shall be done in accordance with ACI design standards, latest edition. Provide No. 4 reinforcement bars placed on maximum 12-inch centers through the slab. Reinforcement must be located at mid wall thickness to be effective.
C. Testing
After construction, gutters shall be checked with flowing water. The Engineer must be present during the flow test. Any high spots or depressions revealed by the flow test shall be repaired by removing that section of concrete and replacing it to the correct grade.
D. Detectable Warning Surfaces
Detectable Warning Surfaces shall be installed at each curb ramp as indicated on the plans, regardless of the slope. Detectable Warning Surfaces shall be the entire width of the landing. Detectable Warning Surfaces for new ramps shall be Armor Tile as manufactured by Engineered Plastics Inc., Cast in place, sound amplifying, color yellow 351
State Streets Pavement Rehabilitation Project
or Engineer approved equal. Product is locally available at Spec West (916-361-1300) or White Cap (916-636-3215).
11.03. MEASUREMENT AND PAYMENT
Concrete curb ramps (includes parallel, perpendicular, and case F) shall be measured and paid for by EACH (EA), with the limits being measured as shown in the plans. Curb ramps to include the curb and gutter within the ramp limit, the hot mix asphalt conform, the vertical to rolled curb transition, aggregate base, and the retaining curb.
Detectable Warning Surface shall be measured and paid for by EACH (EA), as shown in the plans.
Vertical concrete curb & gutter and rolled curb & gutter, shall be measured and paid for by the LINEAR FOOT (LF), measured along the face of the curb, except those portions located within the limits of curb ramps, drop inlets, and all associated transitions. It shall include the aggregate base, hot mix asphalt conform, and any transitions outside the curb ramp limits.
Valley gutter shall be measured and paid for per SQUARE FOOT (SQFT), as shown in the plans.
Valley gutter to include aggregate base, and hot mix asphalt conform.
Concrete drainage inlets shall be measured and paid for per EACH (EA), or as specified in the contract documents, including the portion within the gutter pan.
Payment for units measured shall include labor, materials, equipment, tools and incidentals required to construct a finished curb or flat work product in accordance with the plans, specifications, and as directed by the City Engineer.
The contract price paid per LINEAR FOOT (LF) for remove concrete curb and gutter shall include all labor, materials, tools equipment, and incidentals for saw cutting, removal, and disposal as shown on the plans with no additional compensation allowed therefore. The Contractor shall be responsible for the proper disposal of excavated concrete.
The contract price paid per SQUARE FOOT (SQFT) for remove concrete shall include the removal of concrete driveway, sidewalk, curb ramp and shall include all labor, materials, tools equipment, and incidentals for saw cutting, removal, and disposal as shown on the plans with no additional compensation allowed therefore. The Contractor shall be responsible for the proper disposal of excavated concrete and/or asphalt concrete.
Contractor is also responsible for the repair or replacement at his expense any concrete improvements damaged during his work operations.
SECTION 12
EXCAVATIONS
The following replaces Section 12:
352
State Streets Pavement Rehabilitation Project
12.01. DEFINITIONS
Backfill – Material which covers and surrounds the pipe and extends from the pipe bedding to the top of the trench, inclusive of initial backfill, select backfill, and finish backfill.
Finish Backfill – Material which extends from the select backfill zone to 3” inches below finish grade on existing streets, or to the bottom of the street structural section on new (previously undeveloped) streets, or to the top of the trench in non-street rights-of-ways. Finish backfill shall be Class II AB in an existing street, and may be native material conforming to Section 12.06, or Class II AB in non-street right-of-way.
Initial Backfill – Material surrounding and covering the pipe extending from the pipe bedding to six (6) inches above the top of pipe.
Pipe Bedding – Material that provides support to the bottom of the pipe, measured from the bottom of the trench to the bottom of the pipe.
Select Backfill – Material that extends from the initial backfill zone to the finish backfill zone.
Trench – An excavation in which the depth is greater than the width of the bottom of the trench.
12.02. EXCAVATIONS
Excavations for appurtenant structures such as, but not limited to, manholes, transition structures, junction structures, vaults, valve boxes, catch basin/inlets, thrust blocks, and boring pits shall be deemed to be in the category of trench excavation.
Excavations for retaining walls, barriers, headwalls, and utility box walls shall be deemed structure excavation and shall conform to State Standard Specification Section 19.
Excavation shall include the removal of all water and materials of any nature, which interfere with the construction work. Placement of spoil materials on the paved street area will not be allowed.
Open trenching shall be prohibited on all newly paved and newly overlaid streets and reconstructed streets for a period of two (2) years unless otherwise approved by the City Engineer.
Pursuant to the provisions of Public Contracts Code Division 2, Part 1, Chapter 7, Section 7104, for any work involving the digging of trenches or other excavations that exceed four (4) feet in depth, the following shall apply:
A. The Contractor shall promptly, and before the following conditions are disturbed, notify the City, in writing, of any:
(1) Material that the Contractor believes may be material that is hazardous waste, as defined in Section 25117 of the Health and Safety Code, that is required to be removed to a Class I, Class II, or Class III disposal site in accordance with provisions of existing law.
353
State Streets Pavement Rehabilitation Project
(2) Subsurface or latent physical conditions at the site differing from those indicated on the plans or these specifications
(3) Unknown physical conditions at the site of any unusual nature, different materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for on the plans or these specifications.
B. The City shall promptly investigate the conditions, and if it finds that the conditions do materially so differ, or do involve hazardous waste, and cause a decrease or increase in the Contractor’s cost of, or the time required for, performance of any part of the work shall issue a change order under the procedures described in the Contract.
C. In the event that a dispute arises between the City and the Contractor whether the conditions materially differ, or involve hazardous waste, or cause a decrease or increase in the Contractor’s cost of, or time required for, performance of any part of the work, the Contractor shall not be excused from any scheduled completion date provided for by the contract, but shall proceed with all work to be performed under the Contract. The Contractor shall retain any and all rights provided either by Contract or by law, which pertain to the resolution of disputes and protests between the contracting parties.
12.03. TRENCHES
A. Trench Length
The maximum length of open trench, where prefabricated pipe is to be laid, shall be the distance necessary to accommodate that amount of pipe, which can be installed in a single day. The distance is the collective length at any location, including open excavation, pipe laying and appurtenant construction and backfill which has not been temporarily resurfaced.
B. Trench Width
The maximum clear width of the trench at the top of the pipe shall not be more than the outside diameter of the pipe any point plus two (2) feet. Greater width of trench at the top of the pipe shall be permitted only upon written approval of the City Engineer.
In no case shall the free working space on each side of the pipe be less than six (6) inches.
If the maximum trench is exceeded, the contractor shall provide additional bedding, another type of bedding, or a higher strength of pipe, as shown on the plans or these specifications or as approved by the City Engineer, at no additional cost to the City.
C. Trench Plating
Steel plates will be allowed as an open trench cover (to a maximum length of 50 feet) for instances where stoppage of work is required (i.e. overnight, design change, etc.) Steel plates shall be joined together with tack welds and shall be secured to the existing road surface with steel pins, etc. In addition, steel plates shall have cold mix 354
State Streets Pavement Rehabilitation Project
asphalt concrete placed around all edges, which are exposed to pedestrian and/or vehicular traffic. Non-skid steel plates shall be required in all paved areas.
Use of trench plates shall be minimized. Maximum duration of trench plate use in any one location shall be five (5) calendar days unless otherwise approved by the City Engineer.
D. Trenching Replacement Adjacent to Curb and Gutter
For trenching within existing street, if the distance from the nearest edge of new trench paving to the lip of gutter is less than 36 inches, the existing strip of asphalt between the lip of gutter and trench line shall be removed and repaved in conjunction with the trench resurfacing. (See Detail 2, Sheet 6).
Open trenches on public right-of-way shall be minimized. Maximum duration of asphalt trench cuts shall be 5 calendar days unless otherwise approved by the City Engineer.
12.04. BRACING EXCAVATIONS
The manner of bracing excavations shall be as set forth in the rules, orders, and regulations of the Division of Industrial Safety of the State of California and regulations established by California Occupational Safety and Health Administration.
12.05. PIPE BEDDING
Pipe bedding shall be defined as that material providing support to the bottom of the pipe measured from the bottom of the trench to the bottom of the pipe as shown on the plans.
If soft, spongy, unstable, or similar other material is encountered upon which the pipe bedding material is to be placed, this unsuitable material shall be removed to a minimum depth of six (6) inches and replaced with drain rock suitably densified. Additional drain rock over the amount required by the plans or specifications, shall be paid for as provided in the Contract Provisions.
If the necessity for such additional drain rock material has been caused by an act or failure to act on the part of the Contractor, or is required for the control of ground water, the Contractor shall bear the expense of the additional excavation and bedding. Drain rock material shall conform to section 12.09.
If drain rock is placed in trench, level out top of rock and overlay with Filter Fabric that wraps up side walls a minimum of four (4) inches. Filter Fabric shall conform to Section 88-1.02B Filter Fabric of the State of California Department of Transportation Standard Specifications.
Bedding material shall first be placed so that the pipe is supported for the full length of the barrel with full bearing on the bottom segment of the pipe. Holes shall be excavated to accommodate bells or couplings so that no part of the load is supported by the bells or couplings.
Bedding material shall be compacted to a relative density of 90%. Compaction shall be by mechanical pneumatic or vibratory compaction equipment approved by the Engineer. Bedding material shall meet the specifications listed under Section 12.09 "Backfill Materials." 355
State Streets Pavement Rehabilitation Project
When water is encountered, the trench shall be kept dry until placing of the bedding material and laying and jointing of the pipe has been completed, inspected, and approved. The Contractor shall place a minimum of six (6) inches of pervious material or de-water the trench in a manner which has received prior approval of the Engineer.
For water main installations, if drain rock is placed in the trench to maintain a firm and stable base and maintain the ground water level below pipe laying operations, sand shall not be used for pipe bedding and initial backfill.
12.06 BACKFILL
Backfill shall be defined as that material which extends from the initial backfill to the top of the trench.
Backfill, for cast-in-place structures such as, but not limited to, manholes, transition structures, junction structures, vaults, valve boxes and reinforced concrete box conduits shall start at the surface upon which the base of the structure rests.
Backfill for retaining structures such as, but not limited to, retaining walls, concrete barriers, headwalls, and utility box walls, shall be deemed structure backfill and shall conform to State Standard Specification Section 19.
Except where the pipe must remain exposed for force main leakage tests and subject to the provisions herein, the contractor shall proceed as soon as possible with backfilling operations.
Care shall be exercised so that the conduit will not be damaged or displaced.
A. Cast-In-Place Structures
The Contractor shall not place backfill against or over the top of any cast-in-place structures unless the concrete has attained a compressive strength equal to or greater than eighty five percent (85%) of the specified design strength as determined from cylinder breaks.
B. Voids
Where it becomes necessary to excavate beyond the limits of normal excavation lines in order to remove boulders or other interfering objects, the voids remaining after the removal of the boulders shall be backfilled as specified herein, or as otherwise approved by the City Engineer.
Where the void is below the subgrade for bedding conduits or structures, backfill shall be thoroughly densified bedding or drain rock as approved by the Engineer.
Where the void is in the side of the trench, it shall be backfilled with suitable material and densified as approved by the Engineer.
It shall be understood that the removal of all boulders or other interfering objects and the backfilling of voids left by such removals shall be at the expense of the contractor and no direct payment for the cost of such work will be made. The cost of such work shall be included in the prices bid for the various items of work. 356
State Streets Pavement Rehabilitation Project
After the placing of backfill has been started, the contractor shall proceed as soon as practicable with densification.
12.07 COMPACTION METHODS
Compaction of all backfill material shall be by pneumatic or vibratory compaction equipment.
Ponding and jetting methods will not be permitted, except by written permission from the City.
Unless otherwise shown or specified in the Contract, trench backfill material shall be compacted to a relative compaction of not less than ninety percent (90%). The top six inches (6”) below the subgrade shall be compacted to a relative compaction of ninety five percent (95%). Compaction shall conform to State Standard Specifications unless otherwise stated in these specifications.
Full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in performing compaction, as shown on the plans, as specified in these Special Provisions, and as directed by the Engineer shall be considered as included in the contract prices paid for various contract items of work involved and no additional compensation will be allowed therefore.
12.08 BACKFILL PLACEMENT REQUIREMENTS
The backfill material for trench depths less than five (5) feet measured from the top pipe to the finished road surface shall be imported granular material, uniformly graded Class 2 aggregate base conforming to the requirements in Section 26-1.02A, “Class 2 Aggregate Base”, of the State Standard Specifications. The imported granular material shall be placed on top of the initial backfill material in lifts not to exceed six (6) inches after compaction.
Method "A" is to be used within existing streets. Backfill shall be "select backfill" as specified in these specifications. After completion and acceptance of the subgrade by the Engineer any further excavation shall be considered as work in an existing street.
The area of the trench between the initial backfill zone and five (5) feet below the street structural section shall be mechanically compacted to a minimum relative compaction of ninety percent (90%). The upper five (5) feet of the trench shall contain Class II Aggregate Base mechanically compacted to a minimum relative compaction of ninety five percent (95%), and a temporary layer (2 inch minimum) of asphalt cutback placed to grade. This temporary cutback shall be maintained by the contractor until permanent paving is installed.
Method “B” is to be used within the public right-of-way street areas in previously undeveloped land (new construction.) Backfill shall be as specified in “Backfill”, Section 12.06.
When native material is used as backfill, the area of the trench between the initial backfill zone and 18 inches below the bottom of the street structural section shall be mechanically compacted to a minimum relative compaction of ninety percent (90%). The minimum relative compaction shall be ninety five percent (95%) in the top 18 inches.
Backfill Method “C” may be used for this project upon approval by the City Engineer.
Method “C” is to be used in unimproved or non-street right-of-way areas. Both select and finish backfill areas shall be native material. Compaction shall be done mechanically in uniform lifts so as to attain a minimum relative compaction of ninety percent (90%). 357
State Streets Pavement Rehabilitation Project
Alternate Backfill Method “D” and materials require approval by the City Engineer prior to use.
12.09 BACKFILL MATERIALS
ALL PIPES
Drain Rock: Washed crushed aggregate conforming to the following grading:
1 1/2" x 3/4"
Sieve Size % Passing
2" 100
1 1/2" 90-100
1" 20-55
3/4" 0-15
3/8" 0-5
Pipe Bedding: Shall conform to ASTM D448 #67.
Sieve Size % Passing
1" 100
3/4" 90-100
3/8" 20-55
#4 0-10
#8 0-5
Finish Backfill: (Class II AB)
Sieve Size % Passing
3/4" 87-100
#4 30- 65
#30 5- 35
#200 0- 12
Select Backfill: (Class II AB)
Sieve Size % Passing
3" 100
#4 35-100
#30 20-100
Sand Equivalent to be 20 Min.
Minimum Dry Density 110 lb./cu. ft.
WATER PIPE ONLY
Pipe Bedding & Initial Backfill Sieve Size % Passing
1/2" 100
Sand Equivalent to be 50 Min.
358
State Streets Pavement Rehabilitation Project
The percentage composition by weight in place shall conform to the gradings previously mentioned as determined by Test Method No. California 202. Sand Equivalent for sand backfill material shall be as determined by Test Method No. California 217. Materials as delivered shall be of uniform mixture and shall be free of organic matter and refuse.
12.12. MEASUREMENT AND PAYMENT
Payment for utility trenching, dewatering, excavation, installation, and backfill shall be included as incidental in the price for other items.
Payment for trench sheeting, shoring and bracing, shall be included as incidental in the price for other items.
No additional payment will be made for using slurry cement backfill.
Payment for excavation includes full compensation for furnishing all labor, materials, tools, equipment, and incidentals for performing all work involved in excavation and grading. This item shall include areas where pavement is sawcut and removed for placement of Hot Mix Asphalt outside of the curb ramp, removal of existing speed humps, and curb and gutter conforms.
Measurement of payment for Roadway Excavation and Grading shall be per CUBIC YARD (CY). Roadway Excavation is a Final Pay item. No additional payment will be made should the Contractor remove more material than shown. All work shall conform to the City Standard Specifications, the State Standard Specifications, these Special Provisions, and as directed by the City Engineer.
SECTION 13
STORM DRAINAGE
The following replaces Section 13:
13.1 DESCRIPTION
This work shall include the furnishing of all labor, materials, tools, equipment and incidentals to construct and complete in an efficient and workmanlike manner the installation of the storm drainage system in accordance with the approved plans, these specifications and the City Standard Details.
13.2 MATERIALS
A. Pipe
1. Reinforced Concrete Pipe (RCP) shall conform to State Standard Specification Section 65 and shall be Class III, IV or V rubber gasket type, unless otherwise specified on the plans.
The minimum allowable class of RCP shall be class III for depths from 2’ feet to 28’ feet defined as the distance from the inside top of pipe to the top of finished 359
State Streets Pavement Rehabilitation Project
grade. RCP which lies wholly or partially within the structural section of a street shall be Class V.
Tests on reinforced concrete pipe shall be required to determine conformance with “D” load and reinforcing requirements of these specifications.
Pipe samples for testing shall be furnished, without charge, by the Contractor one week in advance of construction. The cost of testing the pipe shall be borne by the Contractor. One section of pipe from each lot to be used shall be tested in accordance with the procedures outlined in A.S.T.M. C76. Lots tested shall be marked with the date made as well as by lot number for shipment to the specific project for which that lot has been tested. Any pipe arriving on the job without the appropriate markings shall be rejected and sent back to the supplier until such lot or lots can be tested and accepted for use.
In lieu of the above testing of reinforced concrete pipe, the Contractor may submit to the City Engineer the manufacturer’s “Certificate of Compliance” guaranteeing the requirements of A.S.T.M. C76.
2. Polyvinyl Chloride (PVC) Pipe and Fittings shall at a minimum, conform to one of the following specifications:
Diameter Specifications:
8 inches thru 15 inches ASTM Designation: D 3034, SDR 35 18 16 inches thru 27 inches ASTM Design: F794 or F2241, SDR 51 30 inches thru 48 inches ASTM Designation: F794
Polyvinyl Chloride joints shall be bell and spigot using an elastomeric gasket, which meets the requirements of A.S.T.M. Designation F477. The pipe shall have a stop indicated on the barrel or other approved means to accurately position the pipe end in the joint. No solvent weld joints will be allowed.
Connections to manholes drop inlets or other concrete structures shall be made by utilizing manhole adapters or elastomeric seal rings embedded in the concrete.
A written guarantee, warranting ASTM Designation F794 pipe against failure until such time as the pipe may be accepted by the California Department of Transportation shall be furnished to the City by the pipe manufacturer. The guarantee shall include all costs of removing and replacing any failed pipe. Damage caused by construction or maintenance operations may be excluded from the guarantee.
Maximum allowable deflection (reduction in vertical inside diameter) of the installed pipe shall be 5%. On pipes 21 inches in diameter and smaller, the City Engineer may require the Contractor to furnish a properly sized “go, no- go” mandrel, sewer ball, deflectometer, or other approved devices, to check the pipe for maximum allowable deflection. For pipes larger than 21 inches in diameter, deflection may be determined by other means. At any location where the deflection is determined to be excessive, the City Engineer may require the Contractor to remove, re-bed, and if required, replace the pipe. The City Engineer may require certification by the manufacturer that the test results comply with specification requirements. The pipe shall have a home mark to 360
State Streets Pavement Rehabilitation Project
indicate full penetration of the spigot when a joint is made. The date of manufacture shall be marked on the pipe. Pipe being installed shall have been manufactured within 12 months of the date of installation.
3. Other pipe materials that will provide a storm drain system with a minimal leakage rate and maximum durability may be allowed with prior approval by the City Engineer.
4. The use of Non-Reinforced Concrete pipe will be considered on a case-by-case basis with special approval required by the City Engineer.
B. Manholes and Junction Boxes
1. Storm drain manhole bases may be cast-in-place or precast conforming to the Standard Details. Barrel, cone and grade rings shall conform to A.S.T.M. C478. Precast barrel sections shall be 48-inch diameter unless otherwise directed by the City Engineer.
2. Frame and Cover
The country of origin shall be clearly and permanently shown on the top surface of the frame and cover in accordance with the Trade and Tariff Act of 1984.
Date of manufacture shall be clearly and permanently indicated on the cover and the top of the frame.
Seating surface shall be closely machined to nominal dimensions with tolerances not to exceed +/- 1/64 inch.
The weight of the frame shall be 140 lbs. +/- 10 lbs. The weight of the cover shall be 130 lbs. +/- 5 lbs.
3. The storm drain manhole (Standard Detail #302) shall not be used on storm drain conduit greater than 36 inches in diameter. Saddle manholes (Standard Detail #304) shall only be allowed on storm drain conduits greater than 36 inches in diameter, provided that no junction exists with any other storm drain conduit at the manhole.
C. Catch Basins
1. City standard storm drain catch basins shall be cast-in-place or Santa Rosa precast base section for Model 4-A conforming to the Standard Details. Concrete shall be Class A.
2. City standard curb inlets shall be precast, equal to Santa Rosa Mode l 4-A or Phoenix Model P2448C with fiberglass throat form attached or cast-in-place using the Pelican series form liner with fiberglass throat form attached. Frame and cover is required to comply with Buy America requirements. South Bay Foundry frame and cover may be substituted to satisfy Buy America.
3. Type F Inlet may be cast-in-place or precast, and shall conform to State Standard Specification Section 51.
361
State Streets Pavement Rehabilitation Project
4. Caltrans standard catch basins may be cast-in-place or precast, and shall conform to State Standard Specification Section 51.
5. Infiltration system drainage inlet may be cast-in-place or precast conforming to the plans. Concrete shall conform to State Standard Specification Section 51.
6. Infiltration system drainage box may be cast-in-place or precast conforming to the plans. Concrete shall conform to State Standard Specification Section 51. Size of box shall be per the plans.
7. Reset Grate, Frame, and Hood
8. Where existing drainage inlet grates, frames, and hoods, are shown to be reset, the existing structure is to be placed in the position specified in the plans. The resetting of existing storm drain inlets shall be measured and paid for by the unit. The excavation and removal of the storm drain inlet shall conform to Section 38-9 and Section 19 of the Standard Construction Specifications.
D. Headwalls, Wingwalls, Endwalls, and Railings
All headwalls, wingwalls, and endwalls shall be constructed in accordance with the plans and Section 51 of the State Standard Specifications. Temporary bank protection may be provided by sack concrete rip-rap in accordance with Section 72 of the State Standard Specifications.
E. Drainage Pump Stations
Drainage pump stations shall be allowed on an individual basis with the specific approval of the City Engineer.
F. Crushed Drain Rock
Where ASTM 57 Crushed Rock is called for on the plans, portland cement concrete recycled per the following gradation may be used. ASTM 57 Crushed Rock shall be used for the remainder.
Sieve Size Percent
Passing
1 1/2 in. 100
No. 8 (2.36 mm) 0 to 5
Void Ratio 40% minimum
If recycled PCC is used, random samples of processed material shall be selected at the direction of the Engineer for lab testing, as directed by the Engineer, for conformance to the requirements of this section.
Crushed drain rock shall be placed in loose lifts no thicker than 12 inches prior to compaction. Compact each lift with at least three (3) passes of a vibratory plate or vibratory roller compactor.
362
State Streets Pavement Rehabilitation Project
13.3 VISUAL INSPECTION
A. Allowable deviation of drainage pipe from design grade shall be no more than 0.05 feet. In addition, allowable deviation in slope shall be 0.05 feet in any 25-foot length of pipeline.
B. There will be a final visual inspection of the completed system to ensure there is no ground water intrusion. If ground water intrusion is discovered, corrective work shall be done. The cost for this work shall be borne by the contractor.
13.4 MEASUREMENT AND PAYMENT
A. Pipe
Payment for storm drain pipe complete in place shall be per linear foot measured from center of manhole to center of manhole or catch basin, or from center of manhole to wall of outlet structure as the case may be. Measurement shall be along a line parallel to the grade of the storm drain.
Payment shall include the furnishing of all labor, materials, water, tools, and equipment required to construct and complete in an efficient and workmanlike manner the installation of storm drain pipe in accordance with the plans and these specifications. Full compensation for all incidentals arising from this work shall be considered as included in the price paid per linear foot measured and no further compensation shall be allowed.
B. Structures, Manholes, Catch Basins and Curb Inlets
The unit of measure for payment shall be per each unit. Payment shall be made at the bid price per item for each structure complete in place and shall include full compensation for meeting all the provisions of this section, furnishing all labor, materials, tools, equipment, incidentals, the cost of excavation, backfill, frames, covers, plates or reinforcing steel where required, and incidentals for doing all the work.
Full compensation for all incidentals, arising from this work shall be considered as included in the price paid per each unit and no further compensation shall be allowed.
SECTION 20
TRAFFIC SIGNING, STRIPING AND PAVEMENT MARKINGS
Add to Section 20.01 Thermoplastic Traffic Stripes and Pavement Markings:
Thermoplastic traffic stripes and pavement markings shall be used on hot mix asphalt pavement. Do not use thermoplastic on concrete pavement.
The following replaces Section 20.02:
363
State Streets Pavement Rehabilitation Project
SECTION 20.02, PAVEMENT MARKERS
Pavement markers shall conform to the provisions in Section 85 “Pavement Markers”, of the State Standard Specifications and these Special Provisions:
A. Reflective blue marker (Type D Blue) for fire hydrants shall be placed as shown in the Standard Plans.
B. Pavement markers shall not be placed in pavement recesses.
C. Hot melt bitumen adhesive shall be used to cement the pavement markers to the existing pavement. The Rapid Set Type epoxy adhesive shall not be used.
D. Hot melt bitumen adhesive shall be heated indirectly in an applicator with continuous agitation and shall be applied at a temperature between 400°F and 425°F. Pavement Markers shall be placed immediately after application of the adhesive.
E. Blast cleaning of clean, new asphalt concrete surfaces will not be required.
Full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in providing and placing pavement markers, as specified in these Special Provisions, and as directed by the Engineer shall be considered as included in the contract prices paid for various contract items of work involved and no additional compensation will be allowed therefor.
Replace Section 20.04 with the following:
SECTION 20.04, REMOVAL OF EXISTING TRAFFIC STRIPING AND PAVEMENT
MARKINGS
Removal of existing traffic striping and pavement markings shall conform to the provisions in Section 84, “Markings”, of the State Standard Specifications, unless otherwise noted herein.
Nothing in these Specifications shall relieve the Contractor from his responsibilities as provided in Section 7-1.04, “Public Safety”, of the State Standard Specifications.
Conflicting striping and pavement markings shall be removed before the installation of new striping and pavement markings. All traffic striping and pavement markings shall be removed in a rectangular shape. New striping and pavement markings shall be installed within 24 hours of removal of old striping and pavement markings.
Where grinding or sand-blasting is used for the removal of existing traffic striping and pavement markings, and such removal operation is being performed within 10 feet of a lane occupied by public traffic, the residue including dust shall be removed immediately after contact between the grinding or sand-blasting material and the surface being treated. Such removal shall be by a vacuum attachment operating concurrently with the grinding or sand-blasting operation. After the removal of existing traffic striping and pavement markings on asphalt concrete pavement, a fog seal coat shall be applied to the surface of grinding or sandblasting areas in accordance with the provisions in Section 37, “Bituminous Seals”, of the State Standard Specifications. 364
State Streets Pavement Rehabilitation Project
Replace Section 20.06 with the following:
SECTION 20.06, ROADSIDE SIGNS
Roadside signs shall conform to the provisions of Section 82-3, “Roadside Signs”, of the State Standard Specifications, Traffic Manual, Signs Specifications Manual and the most current approved prequalified and tested signing and delineation materials and products list maintained by the California Department of Transportation. The aluminum sign blank shall be a 0.080” inch gauge anodized aluminum sheet, and shall conform to the “Aluminum Substrate Requirements” section of the Caltrans Specifications for Reflective Sheeting Signs, dated October 1993. All signs furnished shall be 3M DG3 Reflective Sheeting with 3M Electro-cut film, or approved equal. Protective graffiti sheeting may be required by the City Engineer.
20.10 MEASUREMENT AND PAYMENT
Replace Section 20.10 with the following:
Payment for all thermoplastic pavement markings, & striping as designated in the contract documents, shall be paid for as SQUARE FOOT (SQFT) and shall include full compensation for furnishing all labor, material, tools, equipment, primer, incidentals and establishing alignment to completely install the thermoplastic traffic stripes and pavement markings. Square footage of the markings is based on Caltrans Standard Plan 2023, Pavement Markings Plans.
All existing traffic striping and pavement markings to be removed shall be shall be considered as included in the contract price paid for thermoplastic pavement markings, & striping, and no separate payment will be made therefore and shall include all labor, materials, tools, equipment, and incidentals for removing existing traffic striping and pavement markings and applying fog seal coat all in accordance with the plans, specifications, and as directed by the City Engineer.
The Contract unit price paid for installing roadside signs shall be paid per EACH (EA) and shall include all labor, materials, tools, equipment, concrete, and incidentals for installing the roadside signs, and no additional compensation will be allowed therefor.
The Contract unit price paid for removing signs shall be paid per EACH (EA) and shall include all labor, materials, tools, equipment, and incidentals for removing the roadside sign, and no additional compensation will be allowed therefor. If sign is determined by the City Engineer to be salvaged, shall be returned to the City of West Sacramento Corporation Yard located at 1951 South River Road, West Sacramento, CA 95691.
SECTION 21
SIGNAL INTERCONNECT SYSTEM AND ELECTRICAL SYSTEMS
The following replaces Section 21;
DESCRIPTION
Signal interconnect system shall conform to the provisions in Section 86, "Electrical Work” and Section 87 “Electrical Systems” of the 2023 Caltrans Standard Specifications, these special provisions, and the City of West Sacramento Standard Specifications.
365
State Streets Pavement Rehabilitation Project
Add to the end of section 15-1.03C:
At least 2 business days before hauling the material to the salvaged material stockpile location, notify the Engineer
The stockpile location is City of West Sacramento Corporation yard at:
1951 South River Road,
West Sacramento, CA 95691
Replace the 1st and 2nd paragraphs of section 86-1.01A with:
Section 86 includes general specifications for electrical work.
Electrical work must comply with part 4 of the California MUTCD and 8 CA Code of Regs, chapter 4, subchapter 5, "Electrical Safety Orders." Replace the 6th paragraph of section 86-1.01C(1) with:
Submit a schedule of values within 15 days of Contract approval.
Add between the 7th and 8th paragraphs of section 86-1.01C(1):
The schedule of values must include material and installation methods for the following:
1. Conduit
2. Pull boxes
3. Conductors and cables
Add to the list in the 2nd paragraph of section 86-1.02C(1):
The pull box cover marking must include City of West Sacramento and one of following:
1. FOC INTERCONNECT for future fiber optic cable system Replace the 3rd paragraph of section 87-1.03A with:
At least 3 business days before performing work on the existing system, notify:
1. The Engineer
Replace the 20th paragraph of section 87-1.03B(1) with:
Terminate conduit through the bottom of a nonmetallic pull box 2 inches above the bottom and 2 inches from the wall closest to the direction of the run.
The conduit must enter at an angle not greater than 45 degrees from the horizontal.
Add to the beginning of section 87-1.03B(3)(a):
Use Type 3 conduit for underground installation.
366
State Streets Pavement Rehabilitation Project
Replace the 12th paragraph of section 87-1.03V(2) with:
Install the conductors in the uppermost compacted layer of HMA. Fill the slot with a sealant flush to the surface.
367
George Reed, Inc.
CPC24-209 State Streets Pavement Rehabilitation
142 Working Days
1795423.1 7203-038
PART 5 CONTRACT DRAWINGS
(BOUND SEPARATELY)
368
Pavement Rehabilitation
boundary area
Future Xing
£¤50
Aster Ave
11 Th St
17Th St
Drever St
Norfolk Ave
19Th St
Virginia Ave
Ballpark
Dr
Park
Cir
Oakmont
Way
Rose
Ct
Alabama Ave
StoneCt
Front
St
Meadow Rd
Lakewood Dr
Grande Vista
AveLongcroft St
Vermont Ave
D
e
erwood S
t
Buckeye Dr
Fallbroo
k
St
Circle St
Jackson St
Webster St
Valley Oak
Ln
16Th St
Ash Ave
Hughes
Cir
Euclid St
Alameda Blvd
Regent St
18Th
St
Maryland Ave
D
elawareAve
Fern wood St
Walnut
Ave
Randolph
Rd
Sel lers
W ay
P
e
nnsylvania Ave
13Th St
Acorn Ct
Clarendon St
10Th
St
Soule St Sonora
Ave
Terminal St
Hickory
Way
Carolina
Ave
Haverhill St
River Rd
§¨¦
Bus
80 S
a
c r
a
m e
n t
o
R i v e
r
D e e p W a t e r C h a n n e l
Stone Blvd
Park Blvd
Locks Dr
Evergreen Ave Poplar Ave
15T h St
Te rminal S
t
Cebrian St
Jeff erson
Blvd
15Th St
Westacre Rd
South Ri
ver
Rd
Industrial
Blv
d
City of West Sacramento, Yolo County, Maxar, Microsoft
§¨¦80
§¨¦5
§¨¦5
§¨¦80
§¨¦80
£¤50
-1
´
0 0.15 0.3
Miles
F:\GIS\Projects\CapitalProjects\15042_StateStreetsPavementRehabilitation\15042_Project_Boundary.aprx, manuelr, 7/24/2024 3:58 PM Figure 1
Proposed Project Site
This map has been compiled using a combination of record maps, tax assessor's maps, and as-builts and is intended for information only and should not be used for legal descriptions.
West
Sacramento
Sacramento
Attachment 2
369
CITY COUNCIL AGENDA REPORT
MEETING DATE: August 21, 2024 ITEM # 4
SUBJECT:
CONSIDERATION OF APPROVAL OF AMENDMENT 1 TO THE CONTRACT FOR SERVICES WITH BRIGHTVIEW LANDSCAPE SERVICES INC (CPE23-231) INITIATED OR REQUESTED BY: REPORT COORDINATED OR PREPARED BY:
Fred Arnold, Real Property Asset Manager
Capital Projects Department
[ ] Council [ X ] Staff
[ ] Other
ATTACHMENT [ X ] Yes [ ] No [ ] Information [ ] Direction [ X ] Action
OBJECTIVE
The objective of this report is to provide the City Council with sufficient information to approve Amendment 1 to the contract for services with BrightView Landscape Services, Inc. (CPE23-231) for ongoing property maintenance of non-operating City properties.
RECOMMENDED ACTION
Staff respectfully recommends that the City Council:
1) Find that the Amendment 1 to the contract for services with BrightView Landscape Services, Inc. (CPE23- 231) for ongoing property maintenance of non-operating City properties is exempt from CEQA pursuant to the Categorical Exemptions under California Code of Regulations, Title 14, Division 6, Chapter 3 (“CEQA Guidelines”), Sections 15301, and find that the determination represents the independent judgment of the City;
2) Authorize the City Manager, or his designee, to issue monthly progress payments to the consultant; 3) Approve Amendment 1 to the contract for services with BrightView Landscape Services, Inc. (CPE23- 231) in the amount of $88,798.10 for ongoing property maintenance of non-operating City properties; 4) Authorize the City Manager, or his designee, to execute Amendment 1 as well as non-substantive changes or modifications to the contract for services, with approval from the City Attorney; 5) Authorize the City Manager or his designee to execute additional amendments or change orders up to $36,201.90 of the contract; and
6) Authorize the City Manager, or his designee, to execute amendments to extend the term of these contracts, if necessary.
BACKGROUND
In the course of implementing City infrastructure projects and other initiatives, staff engage in real property transactions requiring professional real property services. These properties require a wide range of services including but not limited to, acquisition and relocation assistance, appraisal, appraisal review, environmental site assessment Phase I & II escrow and title services, property management, property maintenance services, as well as issuance of a variety of real property permits. The City’s Real Property Asset Management Division is responsible for ensuring that these real property activities are performed in accordance with Federal, state and local policy guidelines and procedures.
In July 2023, the Real Property and Property Management Division was tasked with maintaining non-operating City vacant properties. The division initially collaborated with Public Works and Parks Department staff to maintain parcels. However, the scope of work exceeded eligible fund sources and charter requirements for designated tasks. Thereafter, the Property Division solicited independent licensed landscape contractors to provide, weed abatement and debris removal services to the City. Only two (2) qualified, licensed landscape maintenance companies responded, BrightView Landscaping Services, Inc., and Scott & Sons.
On August 23, 2023, the City of West Sacramento entered into a contract for services with BrightView Landscaping Services, Inc., for the purpose of providing weed abatement and debris removal services for specific non-operating city properties identified in a scope of services and a set fee schedule. The contract provided a not to exceed limit of $50,000 for the term of the contract (October 2, 2023, through October 1, 2025.) The contract has reached its not to exceed limit and additional non-operating parcels requiring weed abatement and debris removal services have been identified.
370
BrightView Landscape Services (CPE23-231) Contract Amendment 1 August 21, 2024