Cities Index.
Agenda packet

Wildomar City Council
December 9, 2024

Document
Agenda packet
Meeting
December 9, 2024
Body
Wildomar City Council
Pages
73
Original file
376.2 MB
Text extracted from the city's file for reading and search. Open the original on d3n9y02raazwpg.cloudfront.net. That file is the official record.

On-Road Traffic Noise
Buildout of the Proposed General Plan would result in an increase in traffic along local roadways.

Figure 5.13-3, Future Traffic Noise Contours, of the DEIR, illustrates the modeled roadways and future 2045 noise contours for 60 dBA CNEL, 65 dBA CNEL, and 70 dBA CNEL. The complete distances to the 70 dBA CNEL, 65 dBA CNEL, and 60 dBA CNEL noise contours for roadway segments in the City are included in Appendix 5.13-1, of the DEIR.

Table 5.13-9, Proposed General Plan Projected Traffic Noise Levels at Buildout, of the DEIR, shows the estimated traffic noise increase along study roadway segments, while Table 5.13-10, Future Traffic Noise Conditions, of the DEIR, lists the calculated future noise levels on roadways at a distance of 50 feet from the nearest travel lane centerline. The traffic noise increase is the difference between the projected future noise level and the existing noise level. As shown in Table 5.13-9, of the DEIR, significant traffic noise increases (i.e., increases greater than 3 dBA in noise environments of 60 to 64 dBA CNEL) are estimated along several of the study roadway segments, including Bundy Canyon Road, Clinton Keith Road, La Estrella Road, Mission Trial, and Salida Del Sol, due to implementation of the proposed project. Therefore, traffic noise impacts associated with buildout of the Proposed General Plan are potentially significant.
3300
Final Environmental Impact Report
for the City Of Wildomar Proposed General Plan
CEQA Findings of Fact and
Statement of Overriding Considerations - 120 - October 2024 Mitigation Measures
No feasible mitigation measures have been identified that would substantially reduce impacts associated with a substantial increase in traffic noise levels at a program-level. However, several measures could be considered for mitigating or avoiding traffic noise impacts at a project-level.

Special Roadway Paving
Notable reductions in tire noise have been achieved via the implementation of special paving materials, such as rubberized asphalt or open-grade asphalt concrete overlays. For example, the California Department of Transportation (Caltrans) conducted a study of pavement noise along Interstate 80 in Davis and found an average improvement of 6 dBA to 7 dBA compared to conventional asphalt overlay. Due to the cost associated with rubberized paving, estimated to be 20-25 percent more than conventional mixes, along with the associated increase in mobilization and setup, the use of rubberized asphalt is not feasible Citywide, however on a case-by- case basis, it could be used as part of project mitigation.1
Sound Barrier Walls
With a cursory review of aerial depictions of the impacted segments, the majority of residences along the study segments have direct access (via driveways) to the associated roadways. Therefore, barrier walls would prevent access to/from individual properties and would be infeasible. Further, these impacted homes are on private property outside of the control of future project developers, so there may be limited admittance onto these properties to construct such walls. Lastly, the costs versus benefits ratio in relation to the number of benefited households may not be feasible and reasonable in all cases.

Sound Insulation of Existing Residences and Sensitive Receptors Exterior-to-interior noise reductions depend on the materials used, the design of the homes, and their conditions. To determine what upgrades would be needed, a noise study would be required for each house to measure exterior-to-interior noise reduction. Sound insulation may require upgraded windows, upgraded doors, and a means of mechanical ventilation to allow for a “windows closed” condition. There are no funding mechanisms and procedures that would guarantee that the implementation of sound insulation features at each affected home would offset the increase in traffic noise to interior areas and ensure that the state’s 45 dBA CNEL standard for single-family and multifamily residences would be achieved.

Finding:

As indicated on page 5.13-38 of Section 5.13, Noise, while several measures were considered to reduce traffic noise, there are no feasible or practical mitigation measures available to reduce project-generated traffic noise. No individual measure and no set of feasible or practical mitigation measures are available to reduce project-generated traffic noise due to economic, legal, social, magnitude, confliction with 1 California Department of Resources Recycling and Recovery (CalRecycle). 2024. Benefits: Rubberized Asphalt Concrete (RAC). https://calrecycle.ca.gov/tires/rac/benefits/#:~:text=Cost%20Effectiveness&text=Generally%20RAC%2DG%20hot%20mixes,equipment%20increases%20initial%20unit%20costs 3301
Final Environmental Impact Report
for the City Of Wildomar Proposed General Plan
CEQA Findings of Fact and
Statement of Overriding Considerations - 121 - October 2024 other General Plan Element policies, or other factors. As such, impacts would remain significant and unavoidable. The identification of this program-level impact does not preclude the finding of lessthan-significant impacts for subsequent projects analyzed at the project-level that would not exceed the traffic noise thresholds.

Changes or alterations have been required in, or incorporated into, the project that lessens the significant environmental effect as identified in the Draft EIR.

The City finds that there are no mitigation measures that are feasible, taking into consideration specific economic, legal, social, technological or other factors, that would substantially lessen or mitigate this impact to a less-than-significant level, and further, that specific economic, legal, social, technological, or other considerations, including considerations for the provision of employment opportunities, make infeasible the alternatives identified in the EIR (Public Resources Code §§ 21081(a)(1), (3); Guidelines §§ 15091(a)(1), (3)). As described in the Statement of Overriding Considerations, the City has determined that this impact is acceptable because specific overriding economic, legal, social, technological, or other benefits, including regionwide or statewide environmental benefits, of the proposed project outweigh its significant effects on the environment.

7. Transportation
Impact 5.17-2: The proposed project would conflict or be inconsistent with CEQA Guidelines § 15064.3, subdivision (b). [Threshold T-2]
Table 5.17-4, Wildomar Horizon Year VMT Efficiency Metrics, of the DEIR, shows that, compared to the Wildomar base year VMT efficiency metrics (see Table 5.17-3), VMT efficiency in the City is expected to improve by approximately 11.6 percent with implementation of the proposed project.

As shown in Table 5.17-4, the City is projected to have a VMT per Service Population at 30.6, which is 87.9 percent of the Riverside County’s base year VMT per Service Population and 88.4 percent of Wildomar’s base year VMT per Service Population. Placement of the land uses associated with the proposed project would reduce the VMT per Service Population within Wildomar by more than three percent (11.6 percent). Additionally, the proposed project includes policies that enhance multimodal transportation, such as Policy CI-2.4 and Policy CI-2.5, which call for the implementation of pedestrian routes and improvement of pedestrian crossing safety; Policy CI-3.1, which calls for the improvement and connectivity of the bicycle network; and Policy CI-4.1, which calls for working with regional partners to ensure adequate transit service is provided consistent with future growth. Moreover, Chapter

10.36, Transportation Demand Management Program, of the Wildomar Municipal Code is intended to establish policies and procedures to encourage and promote the use of alternative transportation modes through project design and facility planning.

The Circulation Element includes several policies that enhance the active transportation network throughout the City to encourage residents to bike or walk rather than taking their personal car. While these policies create an environment that encourages different transportation alternatives, due to the uncertainty regarding the actual development pattern, population growth, and other factors that are outside of the purview and control of the City, it is difficult to rely on the reduction of VMT suggested by the modeling. Further, for the active transportation features to be effective they need to connect 3302
Final Environmental Impact Report
for the City Of Wildomar Proposed General Plan
CEQA Findings of Fact and
Statement of Overriding Considerations - 122 - October 2024 employment, residential, and commercial land uses. As the existing system is not complete, though it will be completed over time, VMT impacts are considered potentially significant.

Mitigation Measures
There are no feasible mitigation measures at the General Plan-level.

Finding:

As indicated on page 5.17-32 of Section 5.17, Transportation, while the placement of land uses associated with the proposed project would reduce the VMT per Service Population within the City by more than three percent, due to the uncertainty regarding the actual development pattern, population growth, and other factors outside the purview of the City’s control, there are no other feasible mitigation measures and impacts would remain significant and unavoidable.

Changes or alterations have been required in, or incorporated into, the project that lessens the significant environmental effect as identified in the Draft EIR.

The City finds that there are no mitigation measures that are feasible, taking into consideration specific economic, legal, social, technological or other factors, that would substantially lessen or mitigate this impact to a less-than-significant level, and further, that specific economic, legal, social, technological, or other considerations, including considerations for the provision of employment opportunities, make infeasible the alternatives identified in the EIR (Public Resources Code §§ 21081(a)(1), (3); Guidelines §§ 15091(a)(1), (3)). As described in the Statement of Overriding Considerations, the City has determined that this impact is acceptable because specific overriding economic, legal, social, technological, or other benefits, including regionwide or statewide environmental benefits, of the proposed project outweigh its significant effects on the environment.

IV. ALTERNATIVES TO THE PROPOSED PROJECT
An EIR must briefly describe the rationale for selection and rejection of alternatives. The lead agency may make an initial determination as to which alternatives are feasible, and therefore, merit in-depth consideration, and which ones are infeasible.

A. Alternatives Considered and Rejected During the Scoping/Project Planning Process
The following is a discussion of the alternatives considered during the scoping and planning process and the reasons why they were not selected for detailed analysis in the Draft EIR.

1. Alternative Development Areas/Annexation Alternative CEQA requires that the discussion of alternatives focus on alternatives to the project or its location that are capable of avoiding or substantially lessening any significant effects of the project. The key question and first step in the analysis is whether any of the significant effects of the project would be avoided or substantially lessened by putting the project in another location. Only locations that would avoid or substantially lessen any of the significant effects of the project need be considered for inclusion in the EIR (CEQA Guidelines § 15126[5][B][1]). Given the nature of the Proposed General Plan, 3303
Final Environmental Impact Report
for the City Of Wildomar Proposed General Plan
CEQA Findings of Fact and
Statement of Overriding Considerations - 123 - October 2024 it is not possible to consider an off-site alternative because the City boundaries have been established through incorporation, and the City does not have authority to carry out functions pursuant to its Proposed General Plan outside of its boundaries. Additionally, land annexation outside is not possible because there is limited room for growth outside of the City boundaries due to the proximity of the neighboring cities—the City of Wildomar is bordered by the City of Lake Elsinore to the north and northwest, unincorporated Riverside County to the west, the City of Murrieta to the south, and the City of Menifee to the east—as well as topographical constraints from the Cleveland National Forest to the southwest. For this reason, an Alternative Development Areas/Annexation Alternative was considered infeasible pursuant to State CEQA Guidelines Section 15126.6(c) and rejected as a feasible project alternative.

2. Reduced Residential Units Alternative
The Reduced Residential Units Alternative would result in fewer residences which would reduce traffic and thereby reduce community impacts from air quality and GHG emissions, and noise. This Alternative would also further reduce the demand for utilities and public services. However, such an alternative would not achieve or would only partially achieve the Proposed General Plan objectives of providing growth in the City. Additionally, this alternative would not be consistent with regional planning efforts that require accommodation of regional housing needs, and therefore, Wildomar would not be able to meet its housing allocation requirements. A reduction in residential units would lead to an inefficient use of land, result in urban sprawl, and thereby, would increase VMT (and further degrade air quality), because residents would have to travel further for their needs. This alternative would also increase development pressure elsewhere in the region. Since this alternative would relocate impacts and growth pressures outside of the City, and would not meet the project objectives, this alternative is rejected as a feasible project alternative.

3. Bundy Canyon Road and Clinton Keith Road Connection Alternative The Bundy Canyon Road and Clinton Keith Road Connection Alternative would provide a new roadway connection between Bundy Canyon Road and Clinton Keith Road, which would reduce traffic congestion and reduce VMT. The roadway connection would also assist evacuation in the event of a wildfire. However, a new roadway cannot be constructed because it would conflict with the Western Riverside County MSHCP Criteria Cell Areas and therefore, conflict with a habitat conservation plan.

In addition, some of the land needed for the roadway is owned by the federal government, which would be unlikely to allow access due to the conflict with the MSHCP. Since the Bundy Canyon Road and Clinton Keith Road Connection Alternative would conflict with MSHCP planning goals, impact sensitive habitat and wildlife, and would not meet the project objectives, this alternative is rejected as a feasible project alternative. The linkage remains as a possible connection on the Circulation Map (see Figure 5.17-8, of the DEIR) of the DEIR as a trail linkage, and there may be a potential for a roadway connection at some point in the future. The location of the potential roadway and trail is conceptual and therefore not addressed in this EIR.

4. Increased Open Space Alternative
The Increased Open Space Alternative would provide an increase in open space, which could allow for better wildlife connectivity and increased open space areas for recreation. Moreover, there are open 3304
Final Environmental Impact Report
for the City Of Wildomar Proposed General Plan
CEQA Findings of Fact and
Statement of Overriding Considerations - 124 - October 2024 space areas within and adjacent to the City in the form of BLM lands, MSHCP Criteria Cell Areas, mountain ranges, and Cleveland National Forest lands, which would provide adequate open space and wildlife connectivity. Additionally, this alternative would result in a reduction in residential development to accommodate an increase in open space, and therefore would not be consistent with regional planning efforts that require accommodation of regional housing needs. Therefore, the Increased Open Space Alternative would not achieve or would only partially achieve the Proposed General Plan objectives of providing growth in the City. As such, this Alternative is rejected as a feasible project alternative.

5. Reduced Density Rural Mountainous Designation Alternative The Reduced Density Rural Mountainous Designation Alternative would reduce density of land designated Rural Mountainous (RM) from one unit per 10 acres to one unit per 20 acres in the eastern and western portions of the City. In order to provide the same number of housing units as the proposed project, the reduction in density of land designated Rural Mountainous would result in an increase of land that is designated for higher density residential uses in other residential land use designations. Higher density development that reduces sprawl would minimize the threat to biodiversity through loss of habitat and fragmentation of habitat. Additionally, higher density development within an already urban area (such as the proposed focus areas) would encourage the increase in public transportation, pedestrian, and bicycle infrastructure, which could reduce air quality and GHG emissions.

Given that the eastern and western portions of the City are within a Very High Fire Hazard Severity Zone, an increase in higher density development could reduce collective exposure as well as expansion into wildfire hazard areas as there would be less structures and residents in the RM designation. Additionally, higher density communities also help limit impacts to environmental services, ecological needs, and recreational goals for open space, while reducing the distribution of firefighting resources during a major wildfire incident. However, higher density communities would change the character of the City and would not achieve the Proposed General Plan objective, nor the City’s vision, of creating a hometown feel. Therefore, this Alternative is rejected as a feasible project alternative.

B. ALTERNATIVES SELECTED FOR FURTHER ANALYSIS
The following alternatives were determined to represent a reasonable range of alternatives with the potential to feasibly attain most of the basic objectives of the project but avoid or substantially lessen one or more of the significant effects of the project. There are two alternatives that were examined in detail in the Draft EIR as follows:1. No Project/Existing General Plan Alternative

2. Increased Residential Density in Mixed Use Areas
The No Project/Existing General Plan Alternative would assume that the Proposed General Plan would not be adopted, and development would follow the development intensity of the existing General Plan. The Increased Residential Density in Mixed Use Areas Alternative would increase the intensity of residential growth in areas designated for mixed uses and would consequently develop less land to accommodate the same projected growth.

1. No Project/Existing General Plan Alternative
3305
Final Environmental Impact Report
for the City Of Wildomar Proposed General Plan
CEQA Findings of Fact and
Statement of Overriding Considerations - 125 - October 2024 Under the No Project/Existing General Plan Alternative, the Proposed General Plan and all of its updates to the Land Use Element, Circulation Element, Recreation and Community Services Element, Open Space and Conservation Element, Noise Element, Economic Development Element, and implementation of the Climate Action Memorandum would not be implemented by the City, and the current General Plan would remain in effect.

Finding:

The No Project/Existing General Plan Alternative would be similar to the proposed project for aesthetics, agriculture and forestry resources, biological resources, cultural resources, geology and soils, hazards and hazardous materials, hydrology and water quality, mineral resources, noise, population and housing, transportation, tribal cultural resources, and wildfire. Impacts to energy, public services, recreation, and utilities and services would be reduced compared to the proposed project. Impacts to air quality, GHG emissions, and land use and planning would be greater than the proposed project. Overall, this Alternative would not result in a more efficient land use plan and would not relieve development pressure in the periphery of the City and as such is deemed to be infeasible and rejected in favor of the proposed project.

2. Increased Residential Density in Mixed-use Areas Alternative The Increased Residential Density in Mixed Use Areas Alternative would result in the same buildout as the Proposed General Plan but would increase the intensity of residential growth in areas designated for mixed uses and would consequently develop less land to accommodate the same projected growth.

The increase of residential units in mixed use areas would further reduce VMT as there would be more residential uses within proximity to public transit, alternative transportation, jobs, and amenities.

Finding:

The Increased Residential Density in Mixed Use Areas Alternative would be similar to the proposed project for geology and soils, hazards and hazardous materials, hydrology and water quality, land use and planning, population and housing, public services, recreation, and utilities and service systems.

This Alternative would result in less impacts compared to the proposed project to agriculture and forestry resources, air quality, biological resources, cultural resources, energy, greenhouse gas emissions, mineral resources, noise, transportation, tribal cultural resources, and wildfire. This Alternative would result in greater impacts to aesthetics compared to the proposed project. Overall, this Alternative would result in an increase in higher density development in the City, compared to the proposed project, which does not align with the City’s vision and as such is deemed to be infeasible and rejected in favor of the proposed project.

V. FINDINGS ON RESPONSES TO COMMENTS ON THE DRAFT EIR AND REVISIONS TO THE FINAL EIR The Final EIR contains responses to comments, revisions, clarifications, and corrections to the Draft EIR. The focus of the response to comments is on the disposition of significant environmental issues as raised in the comments, as specified by State CEQA Guidelines Section 15088(b). The City provided 3306
Final Environmental Impact Report
for the City Of Wildomar Proposed General Plan
CEQA Findings of Fact and
Statement of Overriding Considerations - 126 - October 2024 written responses to each comment made by a public agency, as set forth in Section 2 of the Final EIR, pursuant to State CEQA Guidelines Section 15088(b).

City staff has reviewed this material and determined that none of this material constitutes the type of significant new information that requires recirculation of the Draft EIR for further public comment under CEQA Guidelines Section 15088.5. None of this new material indicates that the project will result in a significant new environmental impact not previously disclosed in the Draft EIR. Additionally, none of this material indicates that there would be a substantial increase in the severity of a previously identified environmental impact that will not be mitigated, or that there would be any of the other circumstances requiring recirculation described in Section 15088.5 of the CEQA Guidelines.

VI. STATEMENT OF OVERRIDING CONSIDERATIONS
CEQA requires decision makers to balance the benefits of the proposed project against its unavoidable environmental risks when determining whether to approve the project. If the benefits of the project outweigh the unavoidable adverse effects, those effects may be considered “acceptable” (State CEQA Guidelines § 15093[a]). CEQA requires the agency to support, in writing, the specific reasons for considering a project acceptable when significant impacts are infeasible to mitigate. Such reasons must be based on substantial evidence in the Final EIR or elsewhere in the administrative record (State CEQA Guidelines § 15093 [b]). The agency’s statement is referred to as a Statement of Overriding Considerations.

The following provides a description of the project’s significant and unavoidable adverse impacts and the justification for adopting a statement of overriding considerations.

A. Significant and Unavoidable Impacts
Although most potential project impacts have been substantially avoided or mitigated, as described above, there remain 11 project impacts for which complete mitigation is not feasible and for which there is no viable and feasible alternative. The Draft EIR identified the following significant and unavoidable impacts of the proposed project, which would continue to be possible upon implementation of the proposed project:

Agricultural and Forestry Resources
 Impact 5.2-1: The proposed project would convert farmland to nonagricultural uses.

Air Quality
 Impact 5.3-1: Buildout of the Proposed General Plan, and associated emissions, would exceed the assumptions of the South Coast AQMD’s AQMP.  Impact 5.3-2: Construction activities associated with future development that would be accommodated under the Proposed General Plan could generate short-term emissions in exceedance of the South Coast AQMD’s threshold criteria. 3307
Final Environmental Impact Report
for the City Of Wildomar Proposed General Plan
CEQA Findings of Fact and
Statement of Overriding Considerations - 127 - October 2024  Impact 5.3-3: Implementation of the proposed project would generate additional, long-term emissions in exceedance of South Coast AQMD’s threshold criteria and cumulatively contribute to the South Coast Air Basin’s nonattainment designations.  Impact 5.3-4 The proposed project would expose sensitive receptors to substantial toxic air contaminant concentrations.

Biological Resources
 Impact 5.4-1: Buildout of the proposed Land Use Plan could impact sensitive or special-status plant and animal species known to occur in the City of Wildomar.

Cultural Resources
 Impact 5.5-1: Future development under the proposed project could impact an identified historic resource.

Greenhouse Gas Emissions
 Impact 5.8-1: Implementation of the Proposed General Plan would result in an increase in GHG emissions and would not place the City on a trajectory to achieve the goals established under Executive Order S-03-05 or progress toward the State’s carbon neutrality goal.

Noise
 Impact 5.13-1: Construction activities would result in temporary noise increases in the vicinity of the proposed project.
 Impact 5.13-2: Project implementation would result in temporary construction and long-term operation-related noise that would exceed local standards.

Transportation
 Impact 5.17-2: The proposed project would conflict or be inconsistent with CEQA Guidelines § 15064.3, subdivision (b).

B. Project Benefits in Support of the Statement of Overriding Considerations The following section describes the benefits of the proposed project that outweigh the project’s unavoidable adverse effects and provides specific reasons for considering the project acceptable even though the Final EIR identifies 11 significant and unavoidable project impacts, and that there are no feasible mitigation measures or alternatives. Accordingly, this Statement of Overriding Considerations regarding potentially significant adverse environmental impacts resulting from the proposed project, as set forth below, has been prepared. Pursuant to CEQA Guidelines §15093(c), the Statement of Overriding Considerations will be included in the record of the project approval and will also be noted 3308
Final Environmental Impact Report
for the City Of Wildomar Proposed General Plan
CEQA Findings of Fact and
Statement of Overriding Considerations - 128 - October 2024 in the Notice of Determination. Each of the benefits identified below provides a separate and independent basis for overriding the significant environmental effects of the proposed project.

Having reduced the potential effects of the proposed project through all feasible mitigation measures as described previously herein, and determining that no other viable, feasible alternatives exist, and having balancing the benefits of the proposed project against its potential unavoidable adverse impacts on Agricultural and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Greenhouse Gas Emissions, Noise, and Transportation, if the mitigation measures for these impacts cannot be implemented, the City finds that the following legal requirements and benefits of the proposed project individually and collectively outweigh the potentially significant unavoidable adverse impacts for the following reasons:

1. Implements the Objectives Established for the Proposed Project The project objectives include increasing jobs in the City to encourage more residents to shop and work locally and reduce commuting out of the City. The proposed project also includes new policies that will help in maintaining and enhancing conservation areas, focusing growth along major roadway corridors. By directing growth into specific areas, the proposed project reduces change in the existing residential neighborhoods, and provides for mixed use development in areas of the City where services and transportation converge. While the proposed project would result in 11 significant and unavoidable impacts, implementation of the proposed project would ensure that the City is able to accommodate growth envisioned under the Proposed General Plan while meeting the City’s vision for development.

2. Promotes City’s Economic Vision
The Proposed General Plan supports the City’s economic vision by including economic strategies that reflect the changing conditions. Policies from the Land Use Element and Economic Development Element of the Proposed General Plan that support the City’s economic vision aim to support mixeduse development to enhance the economic vitality of adjoining commercial uses, retain and expand local businesses, and invest in the City’s economic development program to expand and diversify the local tax base. This is essential to enable the City to continue to provide and maintain public services.

Encouraging housing and commercial uses either in a single building as vertical mixed use, or in separate buildings but part of a single project as horizontal mixed use, is a recognized means of encouraging business, and reducing the need to drive thereby reducing air quality, greenhouse gas emissions, and vehicle miles traveled. Diversity of land uses has been recognized since the 1990s as a tool that leads to more efficient cities by creating a compact urban form and providing mobility options.2 A mixeduse land use pattern also allows for diversity in housing prices helping with accessibility and affordability for a wide range of income levels which is both a Housing Element and state goal.

Additionally, the City of Wildomar is bordered by the City of Lake Elsinore to the north and northwest, unincorporated Riverside County to the west, the City of Murrieta to the south, and the City of 2 National Research Council. 2009. Driving and the Built Environment: The Effects of Compact Development on Motorized Travel, Energy Use, and CO2 Emissions -- Special Report 298. Washington, DC: The National Academies Press. https://doi.org/10.17226/12747
3309
Final Environmental Impact Report
for the City Of Wildomar Proposed General Plan
CEQA Findings of Fact and
Statement of Overriding Considerations - 129 - October 2024 Menifee to the east; there are topographical constraints from the Cleveland National Forest to the southwest of the City. Therefore, land annexation is not possible because there is limited room for growth outside of the City’s boundaries. Because it is unlikely that the City would be able to annex land, businesses in the City would need to expand to provide jobs and services to meet the needs of future growth. Increasing the number of jobs in the City has several benefits: for local governments that derive a portion of their revenues from its commercial and industrial tax base, increasing jobs in a jurisdiction can improve the local economy and quality of services while providing residents with access to private services (such as retail) and jobs within shorter commute distances.3 Currently, the top providers of retail taxes are online establishments, which has negative impacts on local retail/businesses. Based on the Market Study Technical Memorandum prepared by PlaceWorks, taxable sales in the City are currently 19 percent of the household income, compared to 26 percent in Menifee, 30 percent in Murrieta, and 47 percent in Lake Elsinore, all cities adjacent to the City of Wildomar.4 By increasing retail uses in the City, there would be an increase in demand for local services as well as an increase in taxable sales. Moreover, by increasing services for local residents the need to travel outside of the City is diminished, further reducing vehicle miles travelled.

Also, by providing housing within the City’s boundaries, the City would generate additional revenue through property taxes, improve its jobs-housing ratio, and reduce commute times for residents who work in the City. Annual increases in property tax have been limited to a maximum of 2.0 percent per year by Proposition 13 since 1978. The City’s property tax share of development that existed at the time of incorporation is fixed, and only the increment of Under existing conditions, the amount of property tax grow will not be able to keep up with the growth of public services; therefore, an increase in housing (0.08 percent of 1 percent of property tax valuation) would assist with funding for future services.

Moreover, while there is an 11.6-acre parcel of Prime Farmland in the City, this parcel, on the northeast corner of Corydon Road and Grand Avenue is currently designated Commercial Retail in the General Plan and is proposed to change to Mixed Use High under the proposed project. The site is not actively farmed, and historical photographs show a previous orchard as shown in an aerial photograph dated May 1994. The property is surrounded by residential and commercial development. As such, it is not feasible from an economic standpoint to preserve this land for agricultural uses as it is surrounded by urbanized uses and is not currently farmed. Given the arid climate of the region, the high price and low supply of water, and the small size of the site, the site would unlikely be a profitable farm. Allowing for mixed uses on the site would not only result in better land use compatibility with the surrounding uses but would also generate tax revenue for the City.

The Inland Valley Medical Center is the only hospital in the region that offers trauma II services. In 2023, approximately 30 trauma visits per day were patients that lived outside of Wildomar. As such, 3 Metropolitan Policy Program at Brookings. 2015, March. The Growing Distance Between People and Jobs in Metropolitan America. https://www.brookings.edu/wp-content/uploads/2016/07/srvy_jobsproximity.pdf 4 PlaceWorks. 2023, June 29. Market Study Technical Memorandum. https://envisionwildomar2040.com/wp-content/uploads/2023/09/O_Market-Study-Technical-Memorandum-DRAFT-20230629.pdf 3310
Final Environmental Impact Report
for the City Of Wildomar Proposed General Plan
CEQA Findings of Fact and
Statement of Overriding Considerations - 130 - October 2024 there is a need for hotel and medical tourism services to accommodate out-of-town patients visiting the Inland Valley Medical Center.

Therefore, while the proposed project would result in significant and unavoidable impacts to several topical areas, such as air quality, cultural resources, noise, and transportation, precluding development in the City would hinder the City’s ability to accommodate growth, stimulate the local economy, and meet the proposed project’s objectives.

3. Provides Diversity in Housing Stock
The proposed project would introduce an additional 8,992 housing units in the City compared to existing conditions. The City adopted its Housing Element and obtained state certification in 2021; the Housing Element includes several policies that support a variety of housing types and densities to accommodate the requirements of the RHNA as well as to ensure the provision of housing units. The Proposed General Plan would provide for a diversity of housing choices which would promote variations in housing prices, types, sizes, and contribute to neighborhood stability by offering more affordable and move-up homes as well as accommodating a diverse income mix.5 Additionally, the Proposed General Plan would accommodate growth by providing housing options without major disruptions to the existing residential neighborhoods (e.g., focusing growth along major corridors in the Focus Areas).

4. Consistency with the Regional Goals in the RTP/SCS
SCAG’s 2020-2045 RTP/SCS was adopted on September 3, 2020. The RTP/SCS encompasses four principles––mobility, economy, healthy/complete communities, and environment––that are important to the region’s future. The 2020 RTP/SCS explicitly lays out goals related to housing, transportation technologies, equity, and resilience to adequately reflect the increasing importance of these topics in the region. Specifically, the goals of the RTP/SCS include encouraging regional economic prosperity; improving mobility, accessibility, and travel safety for people and goods; enhancing the preservation and resiliency of the regional transportation system; increasing movement and travel choices for people and goods; reducing GHG emissions, improving air quality, and adapting to climate change; supporting healthy and equitable communities; leveraging new transportation technologies for efficient travel; encouraging diverse housing types and transportation options; and promoting conservation of natural and agricultural lands.

The proposed project would not adversely affect SCAG’s ability to align plan investments and policies with economic development and competitiveness. The Proposed General Plan would further a compact development pattern by expanding land uses and intensity within the City, especially within the City’s Focus Areas. The proposed vehicular, bicycle, and pedestrian circulation system defined in the Proposed General Plan would be designed, developed, and maintained to meet local and regional transportation needs and would ensure efficient mobility and access. The proposed project would also ensure reliable and safe transit within the City which would lead to enhancing the regional transportation 5 California Department of Housing and Community Development. 2024. Zoning for a Variety of Housing Types. https://www.hcd.ca.gov/planning-and-community-development/housing-elements/building-blocks/zoning-variety-ofhousing-types#:~:text=Providing%20development%20opportunities%20for%20a,accommodating%20a%20diverse%20income%20mix. 3311
Final Environmental Impact Report
for the City Of Wildomar Proposed General Plan
CEQA Findings of Fact and
Statement of Overriding Considerations - 131 - October 2024 system. The Proposed General Plan would reduce emissions and improve air quality, and would also reduce inefficient, wasteful, and unnecessary consumption of energy through compliance with state regulations and implementation of the Proposed General Plan policies. The Proposed General Plan would improve the network of bicycle and pedestrian facilities which would encourage active nonmotorized transportation modes and would also reduce air pollutant and greenhouse gas emissions.

The Proposed General Plan would support a variety of housing types within the City. Encouraging intensification within the City would ensure natural and agricultural lands are conserved.

Encouraging a land use pattern that enhances mobility options, connectivity, diversity in uses, and ease of trip destinations from the point of origin, as well as accessibility to transit, promotes more compact development.6 This, in turn, can lead to a reduction in VMT, GHG emissions, and improvements in air quality and efficiency. The Proposed General Plan includes policies that aim to incorporate Complete Streets principles in all types of transportation as well as incorporating a street grid network to enhance connectivity. Additionally, the City’s certified Housing Element includes policies aimed at providing a diversity of housing types at different affordability levels.

Under the Proposed General Plan, there would be approximately 19,800 persons per square mile on average, which is an increase of 21 percent compared to the existing General Plan (15,573 persons per square mile on average). Therefore, under the Proposed General Plan, the City would result in a more compact urban form due to the increase in density7 which would provide for more efficient travel; reduced VMT, air quality, and GHG emissions; and preserve agricultural and natural lands. Additionally, a more compact urban form would reduce the cost of providing services in the City as additional and/or extended infrastructure would be minimized compared to a more sprawled urban form.

C. Conclusion
The City Council of Wildomar has balanced the project’s benefits against the significant unavoidable impacts. The City Council finds that the proposed project’s benefits, which aim to enhance the City and comply with current legislations, while maintaining the City’s development and economic visions, outweigh the project’s significant unavoidable impacts, and these impacts, therefore, are considered acceptable in the light of the project’s benefits. The City Council finds that each of the benefits described above is an overriding consideration, independent of the other benefits, which warrants approval of the project notwithstanding the project’s significant unavoidable impact. 6 National Research Council. 2009. Driving and the Built Environment: The Effects of Compact Development on Motorized Travel, Energy Use, and CO2 Emissions -- Special Report 298. Washington, DC: The National Academies Press. https://doi.org/10.17226/12747 7 Ibid.
3312
Final Environmental Impact Report
for the City Of Wildomar Proposed General Plan
CEQA Findings of Fact and
Statement of Overriding Considerations - 132 - October 2024 This page intentionally left blank
3313
October 2024 | Mitigation Monitoring and Reporting Program State Clearinghouse No. 2023090064

CITY OF WILDOMAR

PROPOSED GENERAL PLAN EIR
City of Wildomar
Prepared for:

City of Wildomar
Contact: Matthew C. Bassi, Community Development Director 23873 Clinton Keith Road, Suite #110
Wildomar, California 92095
951.677.7751
Prepared by:

PlaceWorks
Contact: Mark Teague, AICP, Managing Principal, Environmental Services 3 MacArthur Place, Suite 1100
Santa Ana, California 92707
714.966.9220
[email protected]
www.placeworks.com
~ PLACEWORKS
3314
3315

MITIGATION MONITORING & REPORTING PROGRAM FOR THE CITY OF W I LDOMAR PROPOSED GENERAL PLAN EIR

CITY OF WILDOMAR
Table of Contents
October 2024 Page i
Section Page

1. INTRODUCTION.............................................................................................................................. 1

1.1 PURPOSE OF MITIGATION MONITORING AND REPORTING PROGRAM............................ 1

1.2 PROJECT CHARACTERISTICS....................................................................................................................... 2

1.3 ENVIRONMENTAL IMPACTS........................................................................................................................ 3

2. MITIGATION MONITORING PROCESS......................................................................................... 5

2.1 MITIGATION MONITORING PROGRAM ORGANIZATION........................................................... 5

2.2 CITY OF WILDOMAR ....................................................................................................................................... 5

2.3 MITIGATION MONITORING TEAM.......................................................................................................... 5

2.4 DISPUTE RESOLUTION .................................................................................................................................. 6

2.5 ENFORCEMENT................................................................................................................................................. 6

3. MITIGATION MONITORING REQUIREMENTS.............................................................................. 7

3.1 PREMONITORING MEETING...................................................................................................................... 7

3.2 CATEGORIZED MITIGATION MEASURES/MATRIX......................................................................... 7

3.3 IN-FIELD MONITORING................................................................................................................................ 7

3.4 DATABASE MANAGEMENT.......................................................................................................................... 7

3.5 COORDINATION WITH CONTRACTORS................................................................................................ 7

3.6 LONG-TERM MONITORING ........................................................................................................................ 7

4. MITIGATION MONITORING REPORTS ....................................................................................... 35

4.1 FIELD CHECK REPORT ................................................................................................................................ 35

4.2 IMPLEMENTATION COMPLIANCE REPORT...................................................................................... 35

4.3 DISPUTE/ENFORCEMENT REPORT ...................................................................................................... 35

5. COMMUNITY INVOLVEMENT ...................................................................................................... 37

6. REPORT PREPARATION ............................................................................................................. 39

6.1 LIST OF PREPARERS....................................................................................................................................... 39 List of Tables
Table Page
Table 1-1 Buildout Statistical Summary .............................................................................................................. 3 Table 3-1 Mitigation Monitoring Requirements................................................................................................ 9 3316

MITIGATION MONITORING & REPORTING PROGRAM FOR THE CITY OF W I LDOMAR PROPOSED GENERAL PLAN EIR

CITY OF WILDOMAR
Table of Contents
Page ii PlaceWorks
This page intentionally left blank.
3317
October 2024 Page 1

1. Introduction

1.1 PURPOSE OF MITIGATION MONITORING AND REPORTING

PROGRAM
The City of Wildomar (City) is the lead agency for the City of Wildomar Proposed General Plan (proposed project) and has developed this Mitigation Monitoring and Reporting Program (MMRP) as a vehicle for monitoring and ensuring the successful implementation of mitigation measures outlined in the City of Wildomar Proposed General Plan EIR, State Clearinghouse No. 2023090064. As the lead agency, the City is responsible for implementing the MMRP, which has been prepared in conformance with Section 21081.6 of the California Public Resources Code, as follows:
(a) When making findings required by paragraph (1) of subdivision (a) of Section 21081 or when adopting a mitigated negative declaration pursuant to paragraph (2) of subdivision (c) of Section 21080, the following requirements shall apply:
(1) The public agency shall adopt a reporting or monitoring program for the changes made to the project or conditions of project approval, adopted in order to mitigate or avoid significant effects on the environment. The reporting or monitoring program shall be designed to ensure compliance during project implementation. For those changes which have been required or incorporated into the project at the request of a responsible agency or a public agency having jurisdiction by law over natural resources affected by the project, that agency shall, if so requested by the lead or responsible agency, prepare and submit a proposed reporting or monitoring program. (2) The lead agency shall specify the location and custodian of the documents or other material which constitute the record of proceedings upon which its decision is based.

The MMRP consists of mitigation measures that avoid, reduce, and/or fully mitigate potential environmental impacts. The mitigation measures have been identified and recommended through preparation of the EIR and drafted to meet the requirements of Public Resources Code, Section 21081.6. 3318

MITIGATION MONITORING & REPORTING PROGRAM FOR THE CITY OF W I LDOMAR PROPOSED GENERAL PLAN EIR

CITY OF WILDOMAR

1. Introduction

Page 2 ends

1.2 PROJECT CHARACTERISTICS

1.2.1 Project Location
The City of Wildomar is in southwestern Riverside County, California, and is bordered by the City of Lake Elsinore to the north and northwest, unincorporated Riverside County to the west, City of Murrieta to the south, and City of Menifee to the east. Interstate and regional access to the City is provided by Interstate 15 (I15), which runs in a general north-south direction through the City.

1.2.2 Project Description
Project Summary
When the City incorporated in 2008, it adopted Riverside County’s General Plan. The project is an update to the City’s General Plan, which will be the first City-specific General Plan for Wildomar. The General Plan is a state-required land use planning document that provides guidance to decision-makers regarding the allocation of resources and the future physical form, location, and character of development in the City. It is the City’s official and overarching policy statement regarding the extent and types of development needed to achieve the community’s physical, economic, social, and environmental goals. Although the General Plan is composed of individual sections, or “elements,” that individually address a specific area of concern, it embodies a comprehensive and integrated planning approach for the jurisdiction.

Proposed General Plan and Buildout
The proposed project includes the following elements that address all the required topics in state law, as well as one additional topical of local importance:
 Land Use
 Circulation
 Recreation and Community Services
 Open Space and Conservation
 Noise
 Economic Development
 Climate Action Memorandum
 Housing and Safety Elements (previously
adopted in 2021; the Safety Element includes
minor revisions as listed in the Final EIR
document)
Rather than a separate element, Environmental Justice policies are embedded throughout relevant elements of the Proposed General Plan.

Buildout projections shown in Table 1-1, Buildout Statistical Summary, compares the existing conditions with the buildout envisioned under the proposed project. The proposed project would result in a net increase of 8,992 units, 27,999 residents, 2,965,538 square feet of non-residential uses, and 6,274 jobs. 3319

MITIGATION MONITORING & REPORTING PROGRAMFOR THE CITY OF W I LDOMAR PROPOSED GENERAL PLAN EIR

CITY OF WILDOMAR

1. Introduction
October 2024 Page 3
Table 1-1 Buildout Statistical Summary
Dwelling Units Population
Non-Residential
Square Footage Employment
Existing 11,988 37,326 2,992,377 5,841
Proposed General Plan 20,980 65,325 5,957,915 12,115
Net Change 8,992 27,999 2,965,538 6,274
Source: City of Wildomar and PlaceWorks 2023

1.3 ENVIRONMENTAL IMPACTS

1.3.1 Impacts Considered Less Than Significant
The EIR identified various thresholds from the California Environmental Quality Act (CEQA) Guidelines in a number of environmental categories that would not be significantly impacted by the proposed project and therefore did not require mitigation. Impacts to the following were found to be less than significant:
 Aesthetics
 Energy
 Hydrology and Water Quality
 Land Use and Planning
 Population and Housing
 Public Services
 Recreation
 Utilities and Service Systems

1.3.2 Potentially Significant Adverse Impacts That Can Be Mitigated, Avoided, or Substantially Lessened
 Geology and Soils
 Hazards and Hazardous Materials
 Mineral Resources
 Tribal Cultural Resources
 Wildfire

1.3.3 Significant and Unavoidable Impacts
 Agriculture and Forestry Resources
 Air Quality
 Biological Resources
 Cultural Resources
 Greenhouse Gas Emissions
 Noise
 Transportation
3320

MITIGATION MONITORING & REPORTING PROGRAM FOR THE CITY OF W I LDOMAR PROPOSED GENERAL PLAN EIR

CITY OF WILDOMAR

1. Introduction

Page 4 ends

This page intentionally left blank
3321
October 2024 Page 5

2. Mitigation Monitoring Process

2.1 MITIGATION MONITORING PROGRAM ORGANIZATION
Overall MMRP management is the responsibility of the City of Wildomar. The City’s technical consultants (CEQA consultant, etc.) may perform related monitoring tasks under the direction of the environmental monitor (i.e., the qualified/professional expert in charge of monitoring and/or implementing mitigation) if they are contracted by the City.

2.2 CITY OF WILDOMAR
As the lead agency, the City is responsible for the review of all monitoring reports, enforcement actions, and document disposition. The City will rely on information provided by individual monitors (e.g., CEQA consultant, etc.) as accurate and up to date, and will field check mitigation measure status, as required.

2.3 MITIGATION MONITORING TEAM
The mitigation monitoring team, consisting of the designated Project Manager (e.g., Community Development Director) and Technical Consultants (CEQA consultant, etc.) are responsible for monitoring implementation and compliance with all adopted mitigation measures and conditions of approval. A major portion of the team’s work will entail in-field monitoring and compliance report preparation. Implementation disputes are brought to the Project Manager, and any appeals would go to the City Manager and ultimately the City Council.

2.3.1 Monitoring Team
The following summarizes key positions in the MMRP and their respective functions:
 Project Manager: Responsible for coordination of mitigation monitoring team, technical consultants, report preparation, and overall program administration and document/report clearinghouse.  Construction Contractor: Responsible for coordination of mitigation monitoring team; technical consultants; report preparation; and implementation the monitoring program, including overall program administration, document/report clearinghouse, and first phase of dispute resolution.  Technical Consultants: Responsible for monitoring in respective areas of expertise (CEQA consultant, project engineer, noise analyst/specialist). Report directly to the Project Manager.

2.3.2 Recognized Experts
The use of recognized experts on the monitoring team is required to ensure compliance with scientific and engineering mitigation measures. The mitigation monitoring team’s recognized experts assess compliance with 3322

MITIGATION MONITORING & REPORTING PROGRAM FOR THE CITY OF W I LDOMAR PROPOSED GENERAL PLAN EIR

CITY OF WILDOMAR

2. Mitigation Monitoring Process

Page 6 ends

required mitigation measures, and recognized experts from responsible agencies consult with the Project Manager regarding disputes.

2.4 DISPUTE RESOLUTION
If the monitoring team determines that a mitigation measure, in the opinion of the monitor, has not been implemented or has not been implemented correctly, the problem will be brought before the Project Manager for resolution. The decision of the Project Manager is final unless appealed to the City Manager. The Project Manager will have the authority to issue stop-work order until the dispute is resolved.

2.5 ENFORCEMENT
Public agencies may enforce conditions of approval through their existing police power, using stop-work orders, fines, infraction citations, revocation of approval/permits, or in some cases, notice of violation for tax purposes.
3323
October 2024 Page 7

3. Mitigation Monitoring Requirements

3.1 PREMONITORING MEETING
A pre-monitoring meeting will be scheduled to review mitigation measures, implementation requirements, schedule conformance, and mitigation monitoring team responsibilities. At such meetings, the monitoring team rules are established, the entire mitigation monitoring program is presented, and any misunderstandings are resolved.

3.2 CATEGORIZED MITIGATION MEASURES/MATRIX
Project-specific mitigation measures have been categorized in matrix format, as shown in Table 3-1, Mitigation Monitoring Requirements. The matrix identifies the environmental factor, specific mitigation measures, schedule, and responsible monitor. The mitigation matrix will serve as the basis for scheduling the implementation of, and compliance with, all mitigation measures.

3.3 IN-FIELD MONITORING
Project monitors and technical subconsultants shall exercise caution and professional practices at all times when monitoring implementation of mitigation measures. Protective wear (e.g., hard hat, glasses) shall be worn at all times in construction areas. Injuries shall be immediately reported to the mitigation monitoring team.

3.4 DATABASE MANAGEMENT
All mitigation monitoring reports, letters, and memos shall be prepared utilizing electronic software, such as Microsoft Word, Adobe, etc.

3.5 COORDINATION WITH CONTRACTORS
The construction manager is responsible for coordination of contractors and for contractor completion of required mitigation measures.

3.6 LONG-TERM MONITORING
Long-term monitoring related to several mitigation measures will be required, including review of project plans to ensure compliance with the most recent versions of the California Building Code and California Fire Code.

Post-construction fire inspections are conducted on a routine basis by the City of Wildomar Fire Department. 3324

WILDOMAR SHOOTING RANGE/ACADEMY PROJECT MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF WILDOMAR

3. Mitigation Monitoring Requirements

Page 8 ends

This page intentionally left blank
3325

MITIGATION MONITORING & REPORTING PROGRAM FOR THE CITY OF W I LDOMAR PROPOSED GENERAL PLAN EIR

CITY OF WILDOMAR

3. Mitigation Monitoring Requirements
October 2024 Page 9
Table 3-1 Mitigation Monitoring Requirements
Mitigation Measure
Responsibility for
Implementation Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
(Date of Compliance)

AGRICULTURAL AND FORESTRY RESOURCES
AG-1 Prior to approval of any development permit on land considered prime, of statewide significance, or unique, the City shall require the following:

1. Completion of the California Department of Conservation Land Evaluation & Site Assessment Model. If the model score is 39 points or less, conversion of the land is not significant, and no further mitigation is required. If the model score is between 40 and 79 points, conversion of the land to urban uses may be significant but will depend on the results of the model. A LESA model score of 80 or greater identifies the conversion as significant and will require mitigation.

2. If the LESA model results determine that conversion of the land to urban uses is a significant impact, the development shall be conditioned to provide either an agricultural easement on existing farmland with a similar or greater LESA model score, or the creation of new agricultural land and easement at a 1:1 ratio.

Future Project
Applicants
Prior to Approval of
Any Development
Permit on Land
Considered Prime, of
Statewide
Significance, or
Unique
City of Wildomar
Community
Development
Department

AIR QUALITY
AQ-1 Prior to discretionary approval by the City of Wildomar for development projects subject to CEQA (California Environmental Quality Act) review (i.e., nonexempt projects), project applicants shall prepare and submit a technical assessment evaluating potential project construction-related air quality impacts to the City of Wildomar Planning Department for review and approval. The evaluation shall be prepared in conformance with the South Coast Air Quality Management District (South Coast AQMD) methodology for assessing air quality impacts.

Specifically, project applicants of discretionary projects within 1,000 feet of sensitive land uses (e.g., residences, schools, day care facilities, and nursing homes, etc.), as measured from the property line of the project site, that utilize off-road equipment of 50 horsepower or more, and that occur for more than 2 months of active construction (i.e., exclusive of interior renovations) shall prepare a construction health risk assessment (HRA) in accordance with policies and procedures of the South Coast AQMD. If the construction HRA shows that the incremental cancer risk exceeds 10 in a million, the appropriate noncancer hazard index exceeds 1.0, or the thresholds as determined by the South Coast AQMD, then the project applicant shall identify and demonstrate measures, such as those listed below, that can reduce potential cancer and noncancer risks to an acceptable level.

Future Project
Applicants
Prior to Discretionary
Approval
City of Wildomar
Community
Development
Department
I
I
3326

MITIGATION MONITORING & REPORTING PROGRAM FOR THE CITY OF W I LDOMAR PROPOSED GENERAL PLAN EIR

CITY OF WILDOMAR

3. Mitigation Monitoring Requirements

Page 10 ends

Table 3-1 Mitigation Monitoring Requirements
Mitigation Measure
Responsibility for
Implementation Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
(Date of Compliance)
If construction-related criteria air pollutants are determined to have the potential to exceed the South Coast AQMD–adopted thresholds of significance, the City of Wildomar Building & Safety department shall require feasible mitigation measures to reduce air quality emissions. Potential measures shall be incorporated as conditions of approval for a project and may include, but are not limited to the following:
 Require fugitive dust control measures that exceed South Coast Air Quality Management District’s Rule 403, such as:
- Requiring use of nontoxic soil stabilizers to reduce wind erosion. - Applying water every four hours to active soil disturbing activities. - Tarping and/or maintaining a minimum of 24 inches of freeboard on trucks hauling dirt, sand, soil, or other loose materials.
 Using construction equipment rated by the United States Environmental Protection Agency as having Tier 4 interim or higher exhaust emission limits.  Ensuring construction equipment is properly serviced and maintained to the manufacturer’s standards.
 Limiting nonessential idling of construction equipment to no more than five consecutive minutes.
 Using Super-Compliant VOC paints for coating of architectural surfaces whenever possible. A list of Super-Compliant architectural coating manufactures can be found on the South Coast Air Quality Management District’s website at:
https://www.aqmd.gov/home/rules-compliance/compliance/vocs/architecturalcoatings/super-compliant-coatings.

These identified measures shall be incorporated into all appropriate construction documents (e.g., construction management plans) submitted to the City and shall be verified by the City’s Planning Department.

AQ-2 Prior to discretionary approval by the City of Wildomar for development projects subject to CEQA (California Environmental Quality Act) review (i.e., nonexempt projects), project applicants shall prepare and submit a technical assessment evaluating potential project operation-phase-related air quality impacts to the City of Wildomar Planning Department for review and approval. The evaluation shall be prepared in conformance with South Coast Air Quality Management District (South Coast AQMD) methodology in assessing air quality impacts. If operation-related air pollutants are determined to have the potential to exceed the South Coast AQMD– Future Project
Applicants
During Plan Check
and Prior to
Discretionary
Approval
City of Wildomar
Community
Development
Department
3327

MITIGATION MONITORING & REPORTING PROGRAM FOR THE CITY OF W I LDOMAR PROPOSED GENERAL PLAN EIR

CITY OF WILDOMAR

3. Mitigation Monitoring Requirements
October 2024 Page 11
Table 3-1 Mitigation Monitoring Requirements
Mitigation Measure
Responsibility for
Implementation Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
(Date of Compliance)
adopted thresholds of significance, the City of Wildomar Planning Department shall require that applicants for new development projects incorporate mitigation measures to reduce air pollutant emissions during operational activities. The identified measures shall be included as part of the conditions of approval.

Possible mitigation measures to reduce long-term emissions could include, but are not limited to the following:
 For site-specific development that requires refrigerated vehicles, the construction documents shall demonstrate an adequate number of electrical service connections at loading docks for plug-in of the anticipated number of refrigerated trailers to reduce idling time and emissions.
 Applicants for manufacturing and light industrial uses shall consider energy storage and combined heat and power in appropriate applications to optimize renewable energy generation systems and avoid peak energy use.  Site-specific developments with truck delivery and loading areas and truck parking spaces shall include signage as a reminder to limit idling of vehicles while parked for loading/unloading in accordance with California Air Resources Board Rule 2845 (13 CCR Chapter 10 § 2485).
 Provide bicycle parking facilities per the Nonresidential Voluntary Measures and Residential Voluntary Measures of CALGreen.
 Provide facilities to support electric charging infrastructure per the Nonresidential Voluntary Measures and Residential Voluntary Measures of CALGreen.  Applicant-provided appliances shall be Energy Star–certified appliances or appliances of equivalent energy efficiency (e.g., dishwashers, refrigerators, clothes washers, and dryers). Installation of Energy Star–certified or equivalent appliances shall be verified by the City during plan check.

AQ-3 Industrial and Warehouse Development Health Risk Assessments. Prior to discretionary approval by the City of Wildomar, project applicants for new industrial or warehousing development projects that 1) have the potential to generate 100 or more diesel truck trips per day or have 40 or more trucks with operating diesel-powered transport refrigeration units, and 2) are within 1,000 feet of a sensitive land use (e.g., residential, schools, hospitals, nursing homes), as measured from the property line of the project to the property line of the nearest sensitive use, shall submit an operational health risk assessment (HRA) to the City of Wildomar Planning Department for review and approval. The HRA shall be prepared in accordance with policies and procedures Future Project
Applicants
Prior to Discretionary
Approval for
Industrial and
Warehouse
Developments
City of Wildomar
Community
Development
Department
3328

MITIGATION MONITORING & REPORTING PROGRAM FOR THE CITY OF W I LDOMAR PROPOSED GENERAL PLAN EIR

CITY OF WILDOMAR

3. Mitigation Monitoring Requirements

Page 12 ends

Table 3-1 Mitigation Monitoring Requirements
Mitigation Measure
Responsibility for
Implementation Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
(Date of Compliance)
of the state Office of Environmental Health Hazard Assessment and the South Coast AQMD. If the HRA shows that the incremental cancer risk and/or noncancer hazard index exceeds the respective threshold, as established by the South Coast AQMD at the time a project is considered, the project applicant will be required to identify best available control technologies for toxics (T BACTs) and appropriate enforcement mechanisms and demonstrate that they are capable of reducing potential cancer and noncancer risks to an acceptable level. T-BACTs may include but are not limited to restricting idling on-site or electrifying warehousing docks to reduce diesel particulate matter, or requiring use of newer equipment and/or vehicles. T-BACTs identified in the HRA shall be identified as mitigation measures in the environmental document and/or incorporated into the site plan.

BIOLOGICAL RESOURCES
BIO-1 If an action may adversely impact biological resources, a qualified biologist or their trained designee shall conduct mandatory worker environmental awareness training for all parties involved with implementation of the action (e.g., contractors and work crews), prior to the start of construction, to aid the parties in recognizing special-status species and other sensitive biological resources that may occur within the area of the proposed action. The training shall include identification of the special-status species with potential to occur and their habitats, a description of the regulatory status of sensitive resources, and review of the impact limits, location of environmentally sensitive areas, and measures required to reduce impacts to avoided onsite and offsite biological resources.

Future Project
Applicants and
Qualified Biologist
Prior to the Start of
Construction
City of Wildomar
Community
Development
Department
BIO-2 If an action has potential to inadvertently impact avoided onsite or offsite biological resources, appropriate measures shall be developed and implemented prior to the start of ground disturbing activities to ensure all impacts occur only in the area of the proposed action. Appropriate measures may include control of sediment, erosion, and hazardous materials; demarcation of action area prior to implementation and maintenance of demarcation through the duration of implementation; and measures to ensure all actions that have potential to impact biological resources stay within the demarcated limits.

Future Project
Applicants and
Qualified Biologist
Prior to the Start of
Ground-Disturbing
Activities
City of Wildomar
Community
Development
Department
I
3329

MITIGATION MONITORING & REPORTING PROGRAM FOR THE CITY OF W I LDOMAR PROPOSED GENERAL PLAN EIR

CITY OF WILDOMAR

3. Mitigation Monitoring Requirements
October 2024 Page 13
Table 3-1 Mitigation Monitoring Requirements
Mitigation Measure
Responsibility for
Implementation Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
(Date of Compliance)
BIO-3 If an action has potential to adversely impact amphibian species (e.g., may impact potential habitat for amphibians or may otherwise result in disturbance to amphibians from noise, light, or some other potentially disturbing activity), prior to the start of ground-disturbing activities, determine if a project falls within the mapped survey area for amphibian species (arroyo toad, California red-legged frog, and mountain yellowlegged frog [Rana muscosa]) and if suitable habitat is present, then focused surveys shall be required prior to ground-disturbing activities and the results shall be included in the habitat assessment. Focused surveys shall be conducted in accordance with accepted survey protocols for the arroyo toad, California red-legged frog, and mountain yellow-legged frog (USFWS Survey Protocol for the Arroyo Toad [1999], USFWS Revised Guidance on Site Assessments and Field Surveys for the California RedLegged Frog [2005], and MSHCP Mountain Yellow-Legged Frog Survey Protocol). If a project is not located within an amphibian survey area, a statement to this effect shall be included in the and the results shall be included in the habitat assessment and no further action is required. If it is determined in the habitat assessment prepared by a qualified biologist that there is no potential habitat for amphibian species to occur within a project site, a conclusion that no suitable habitat is present on the site supported with solid evidence and no other measures are recommended shall be provided to the project applicant and the City of Wildomar Community Development Department. If conditions or circumstances change after the environmental analysis is conducted and prior to ground-disturbing activities associated with the action, then the validity of the results shall be confirmed, or an updated environmental analysis shall be conducted prior to impacting a project site.

If amphibian species are identified within a project site and a project cannot avoid (permanent or temporary) at least 90 percent of the occupied portion of the property that contributes to the long-term conservation value of the species, a DBESP shall be required. A justification by a qualified biologist regarding how the 90 percent and 10 percent determinations were made is required and shall be included in the DBESP.

Refer to Figure 5.4-8, Flow Chart to Guide Special-Status Wildlife (Amphibians) Recommendations.

Future Project
Applicants and
Qualified Biologist
Prior to the Start of
Ground-Disturbing
Activities
City of Wildomar
Community
Development
Department
3330

MITIGATION MONITORING & REPORTING PROGRAM FOR THE CITY OF W I LDOMAR PROPOSED GENERAL PLAN EIR

CITY OF WILDOMAR

3. Mitigation Monitoring Requirements

Page 14 ends

Table 3-1 Mitigation Monitoring Requirements
Mitigation Measure
Responsibility for
Implementation Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
(Date of Compliance)
BIO-4 If an action has potential to adversely impact the burrowing owl (Athene cunicularia) (e.g., may impact potential habitat or may otherwise result in disturbance to burrowing owls from noise, light, or some other potentially disturbing activity), prior to the start of ground-disturbing activities, determine if a project falls within the mapped (designated) survey area for the burrowing owl and if suitable habitat is present, then focused surveys shall be required prior to ground-disturbing activities and the results shall be included in the habitat assessment. Focused surveys shall be conducted in accordance with the MSHCP Burrowing Owl Survey Instructions and during the breeding season (survey window is March 1-August 31). If a project is not located within the burrowing owl survey area, include a statement to this effect and no further action is required. If it is determined in the habitat assessment prepared by a qualified biologist that there is no potential habitat for burrowing owls to occur within a project site, a conclusion that no suitable habitat is present on the site supported with solid evidence and no other measures are recommended shall be provided to the project applicant and the City of Wildomar Community Development Department. If conditions or circumstances change after the environmental analysis is conducted and prior to ground-disturbing activities associated with the action, then the validity of the results shall be confirmed, or an updated environmental analysis shall be conducted prior to impacting a project site.

If burrowing owls are not found during focused surveys, documentation prepared by a qualified biologist shall include a written commitment to conduct pre-construction surveys for the burrowing owl in areas of suitable habitat no more than 30 days prior to the initiation of ground disturbance (e.g., vegetation clearing, clearing and grubbing, tree removal, site watering, equipment staging, grading, etc.) to ensure that no owls have colonized the site in the days or weeks preceding the ground-disturbing activities. If burrowing owls have colonized a project site prior to the initiation of ground-disturbing activities, the project proponent shall immediately inform the Regional Conservation Authority (RCA) and the Wildlife Agencies, such as the California Department of Fish and Wildlife, and will need to coordinate further with RCA and the Wildlife Agencies, including the possibility of preparing and getting approval of a Burrowing Owl Protection and Relocation Plan, prior to initiating ground disturbance. If ground-disturbing activities occur, but the site is left undisturbed for more than 30 days, a pre-construction survey will be required again to ensure Future Project
Applicants and
Qualified Biologist
Prior to the Start of
Ground-Disturbing
Activities
City of Wildomar
Community
Development
Department
3331

MITIGATION MONITORING & REPORTING PROGRAM FOR THE CITY OF W I LDOMAR PROPOSED GENERAL PLAN EIR

CITY OF WILDOMAR

3. Mitigation Monitoring Requirements
October 2024 Page 15
Table 3-1 Mitigation Monitoring Requirements
Mitigation Measure
Responsibility for
Implementation Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
(Date of Compliance)
burrowing owl has not colonized the site since it was last disturbed. If the burrowing owl is found, the same coordination described above shall be necessary.

If burrowing owls are identified within a project site and a project cannot avoid (permanent or temporary) at least 90 percent of the occupied portion of the property that contributes to the long-term conservation value of the species, a DBESP is required and a Burrowing Owl Protection and Relocation Plan shall be prepared, approved and implemented. A justification by a qualified biologist regarding how the 90 percent and 10 percent determinations were made is required and shall be included in the DBESP. Refer to Figure 5.4-9, Flow Chart to Guide Burrowing Owl Recommendations.

BIO-5 If an action has potential to adversely impact mammal species (e.g., may impact potential habitat for mammals or may otherwise result in disturbance to mammals from noise, light, or some other potentially disturbing activity), prior to the start of ground-disturbing activities, determine if a project falls within the mapped survey area for mammal species (Aguanga kangaroo rat [Dipodomys merriami collinus], Los Angeles pocket mouse [Perognathus longimembris brevinasus], and San Bernardino kangaroo rat) and if suitable habitat is present, then focused surveys shall be required prior to ground-disturbing activities and the results shall be included in the habitat assessment. Focused surveys shall be conducted in accordance with accepted survey protocols for these species (MSHCP Biological Monitoring Program – Stephens’ Kangaroo Rat [2006] and Survey Protocol for Los Angeles Pocket Mouse).

If a project is not located within a mammal survey area, include a statement to this effect and no further action is required. If it is determined in the habitat assessment prepared by a qualified biologist that there is no potential habitat for mammal species to occur within a project site, a conclusion that no suitable habitat is present on a site supported with solid evidence and no other measures are recommended shall be provided to the project applicant and the City of Wildomar Community Development Department. If conditions or circumstances change after the environmental analysis is conducted and prior to ground-disturbing activities associated with the action, then the validity of the results shall be confirmed, or an updated environmental analysis shall be conducted prior to impacting a project site.

Future Project
Applicants and
Qualified Biologist
Prior to the Start of
Ground-Disturbing
Activities
City of Wildomar
Community
Development
Department
3332

MITIGATION MONITORING & REPORTING PROGRAM FOR THE CITY OF W I LDOMAR PROPOSED GENERAL PLAN EIR

CITY OF WILDOMAR

3. Mitigation Monitoring Requirements

Page 16 ends

Table 3-1 Mitigation Monitoring Requirements
Mitigation Measure
Responsibility for
Implementation Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
(Date of Compliance)
If mammal species are identified within a project site and a project cannot avoid (permanent or temporary) at least 90 percent of the occupied portion of the property that contributes to the long-term conservation value of the species, a DBESP is required. A justification by a qualified biologist regarding how the 90 percent and 10 percent determinations were made is required and shall be included in the DBESP.

BIO-6 If an action has potential to adversely impact vernal pools or other suitable fairy shrimp habitats, then focused surveys shall be required prior to ground-disturbing activities and the results shall be included in the habitat assessment. Focused surveys shall be conducted pursuant to the USFWS Survey Guidelines for the Listed Large Branchiopods, which includes six listed fairy shrimp species, including those species covered under the MSHCP Section 6.1.2. Two seasons of fairy shrimp surveys are required. If it is determined in the habitat assessment prepared by a qualified biologist that there is no potential habitat for vernal pools or fairy shrimp species to occur within a project site, a conclusion that no suitable habitat is present on the site supported with solid evidence and no other measures are recommended shall be provided to the project applicant and the City of Wildomar Community Development Department. If conditions or circumstances change after the environmental analysis is conducted and prior ground-disturbing activities associated with the action, then the validity of the results shall be confirmed, or an updated environmental analysis shall be conducted prior to impacting a project site.

If fairy shrimp species are identified within a project site and a project cannot avoid (permanent or temporary) at least 90 percent of the occupied portion of the property that contributes to the long-term conservation value of the species, a DBESP is required. A justification by a qualified biologist regarding how the 90 percent and 10 percent determinations were made is required and shall be included in the DBESP.

Refer to Figure 5.4-10, Flow Chart to Guide Vernal Pools and Fairy Shrimp Recommendations.

Future Project
Applicants and
Qualified Biologist
Prior to the Start of
Ground-Disturbing
Activities
City of Wildomar
Community
Development
Department
BIO-7 If an action has potential to adversely impact riparian bird species (least Bell’s vireo, southwestern willow flycatcher, or yellow-billed cuckoo [Coccyzus americanus]), and if suitable habitat (nesting and/or foraging) is present, then protocol-level focused surveys shall be required. Focused surveys shall be conducted in accordance with accepted USFWS survey protocols for the least Bell’s vireo, southwestern willow flycatcher, and yellow-billed cuckoo (Least Bell’s Vireo Survey Guidelines [2001], A Future Project
Applicants and
Qualified Biologist
Prior to the Start of
Ground-Disturbing
Activities
City of Wildomar
Community
Development
Department
3333

MITIGATION MONITORING & REPORTING PROGRAM FOR THE CITY OF W I LDOMAR PROPOSED GENERAL PLAN EIR

CITY OF WILDOMAR

3. Mitigation Monitoring Requirements
October 2024 Page 17
Table 3-1 Mitigation Monitoring Requirements
Mitigation Measure
Responsibility for
Implementation Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
(Date of Compliance)
Natural History Summary and Survey Protocol for the Southwestern Willow Flycatcher [2010], and A Natural History Summary and Survey Protocol for the Western Distinct Population Segment of the Yellow-Billed Cuckoo [2016]). If it is determined in the habitat assessment prepared by a qualified biologist that there is no potential habitat for riparian bird species to occur within a project site, a conclusion that no suitable habitat is present on the site supported with solid evidence and no other measures are recommended shall be provided to the project applicant and City of Wildomar Community Development Department. If conditions or circumstances change after the environmental analysis is conducted and prior to ground-disturbing activities associated with the action, then the validity of the results shall be confirmed, or an updated environmental analysis shall be conducted prior to impacting a project site.

If least Bell’s vireo, southwestern willow flycatcher, or yellow-billed cuckoo are identified within a project site and a project cannot demonstrate 90 percent avoidance of the occupied portion of the property that contributes to the long-term conservation value of the species, a DBESP is required. This includes 100 meters of undeveloped landscape on a property adjacent to the habitat conserved. A justification by a qualified biologist regarding how the 90 percent and 10 percent determinations were made is required and shall be included in the DBESP. Refer to Figure 5.4-11, Flow Chart to Guide Riparian Bird Species Recommendations.

BIO-8 If an action has the potential to impact coastal California gnatcatcher, a habitat assessment shall be prepared by a qualified biologist to determine if suitable habitat is present in the area of the proposed action. If suitable habitat is present (i.e., coastal sage scrub, Riversidean sage scrub) and an action has potential to adversely impact the coastal California gnatcatcher, avoid clearing, grubbing, grading, and associated construction actions in gnatcatcher occupied habitat within the Criteria Cells and/or PQP lands between March 1 and August 15. If this species is detected and a project may be potentially occupied and the habitat cannot be avoided, this habitat cannot be removed from March 1 to August 15 without conducting focused protocol-level surveys to prove absence. If it is determined in the habitat assessment prepared by a qualified biologist that there is no potential habitat for coastal California gnatcatcher to occur within a project site, a conclusion that no suitable habitat is present on the site supported with solid evidence and no other measures are recommended shall be provided to the project applicant and the City of Wildomar Community Development Future Project
Applicants and
Qualified Biologist
Prior to the Start of
Ground-Disturbing
Activities
City of Wildomar
Community
Development
Department
3334

MITIGATION MONITORING & REPORTING PROGRAM FOR THE CITY OF W I LDOMAR PROPOSED GENERAL PLAN EIR

CITY OF WILDOMAR

3. Mitigation Monitoring Requirements

Page 18 ends

Table 3-1 Mitigation Monitoring Requirements
Mitigation Measure
Responsibility for
Implementation Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
(Date of Compliance)
Department. Refer to Figure 5.4-12, Flow Chart to Coastal Gnatcatcher Recommendations.

BIO-9 If an action that may adversely impact birds or nests (e.g., ground or vegetation disturbance, noise near nesting habitat) and is expected is to occur during the nesting season (generally February 1 through September 15), a pre-construction nesting-bird survey shall be conducted for all suitable nesting habitat within three days prior to ground-disturbing activities associated with the action. The survey shall be conducted by a qualified biologist within a project site plus a buffer for the project as determined by the qualified biologist (based on the action and what bird species may be impacted). If no nesting birds are observed during the survey, site preparation and construction activities may begin. If nesting birds (including nesting raptors) are found to be present, avoidance or minimization measures shall be undertaken to avoid potential project-related impacts. Measures may include seasonal work restrictions or establishment of a non-disturbance buffer around each active nest until nesting has been completed as determined through periodic nest monitoring by the biologist. The size of the non-disturbance buffer shall be determined by the project biologist. Once nesting is deemed complete by the project biologist, work may resume within the buffer. Refer to Figure 5.4-13, Flow Chart to Guide Special-Status Wildlife (Including Protected Birds/Nests) Recommendations.

Future Project
Applicants and
Qualified Biologist
Three Days Prior to
the Start of GroundDisturbing Activities
City of Wildomar
Community
Development
Department
BIO-10 If an action may impact sensitive natural vegetation communities, an environmental analysis to determine if there is potential for sensitive natural communities or other protected vegetation communities shall be conducted by a qualified biologist. If it is determined that in the habitat assessment prepared by a qualified biologist that there are no sensitive natural communities or other protected vegetation communities within a project site, no other measures are recommended. If sensitive natural communities (riparian habitat, riverine areas, vernal pools) are identified within the impact area (permanent and temporary, direct and indirect), appropriate measures to avoid, minimize, or mitigate for impacts to sensitive natural communities shall be implemented. If riparian/riverine resources and vernal pools are proposed for avoidance, the habitat assessment shall include a commitment to place a conservation easement or deed restriction over the area in order to demonstrate that the area will be protected in perpetuity. If a project cannot avoid riparian/riverine habitat and/or vernal pools in perpetuity (both permanent and temporarily), a DBESP Future Project
Applicants and
Qualified Biologist
Prior to the Start of
Ground-Disturbing
Activities
City of Wildomar
Community
Development
Department and
applicable Wildlife
Agencies
3335

MITIGATION MONITORING & REPORTING PROGRAM FOR THE CITY OF W I LDOMAR PROPOSED GENERAL PLAN EIR

CITY OF WILDOMAR

3. Mitigation Monitoring Requirements
October 2024 Page 19
Table 3-1 Mitigation Monitoring Requirements
Mitigation Measure
Responsibility for
Implementation Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
(Date of Compliance)
shall be required that would propose mitigation that demonstrates equivalent or superior function and value, and shall be submitted to the City of Wildomar Community Development Department and applicable Wildlife Agencies. Refer to Figure 5.4-15, Flow Chart to Guide Riparian Habitat/Riverine Areas and Vernal Pools.

BIO-11 If an action will impact riparian habitat as determined by a qualified biologist, a Lake and Streambed Alteration Agreement, pursuant to Section 1602 of the California Department of Fish and Game Code shall be obtained prior to the start of ground disturbing activities. Minimization measures will be developed during consultation with CDFW as part of the Lake and Streambed Alteration Agreement process to ensure protections for affected fish and wildlife resources.

Future Project
Applicants and
Qualified Biologist
Prior to the Start of
Ground-Disturbing
Activities
City of Wildomar
Community
Development
Department and
applicable Wildlife
Agencies
BIO-12 If an action has the potential to impact aquatic resources, an environmental analysis (i.e., a preliminary aquatic resources delineation) shall be conducted to determine if potentially regulated aquatic resources occur within a project site. A qualified wetland delineator shall conduct the environmental analysis and it shall include review of the best available hydrological information, a reconnaissance-level site visit, and an evaluation of aquatic resources to determine the potential for regulated aquatic resources to occur within a project site. If it is determined in the habitat assessment prepared by a qualified biologist that there are no potentially regulated aquatic resources, no other measures are recommended and the habitat assessment shall be submitted to the City of Wildomar Community Development Department and applicable Wildlife Agencies. If conditions or circumstances change after the environmental analysis is conducted and prior to ground-disturbing activities associated with the action, the validity of the results shall be confirmed or an updated environmental analysis shall be conducted prior to impacting a project site. Refer to Figure 5.4-16, Flow Chart to Guide Aquatic Resources Recommendations.

Future Project
Applicants and
Qualified Wetland
Delineator
Prior to the Start of
Ground-Disturbing
Activities
City of Wildomar
Community
Development
Department and
applicable Wildlife
Agencies
BIO-13 If an action may impact potentially regulated aquatic resources, an aquatic resources delineation shall be conducted by a qualified biologist for a project consistent with the methods detailed within the Corps of Engineers Wetlands Delineation Manual (Environmental Laboratory 1987), Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Arid West Region (USACE 2008), and State Wetlands Definitions and Procedures for Discharges of Dredged and Fill Material to Waters of the State, and local policies by the CDFW regarding their jurisdiction, following the Future Project
Applicants and
Qualified Biologist
Prior to the Start of
Ground Disturbing
Activities
City of Wildomar
Community
Development
Department and
USACE
3336

MITIGATION MONITORING & REPORTING PROGRAM FOR THE CITY OF W I LDOMAR PROPOSED GENERAL PLAN EIR

CITY OF WILDOMAR

3. Mitigation Monitoring Requirements

Page 20 ends

Table 3-1 Mitigation Monitoring Requirements
Mitigation Measure
Responsibility for
Implementation Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
(Date of Compliance)
definitions contained within the California Fish and Game Code pertaining to regulated resources (lakes, streams, and associated hydrophytic vegetation). If it is determined by a qualified biologist that potentially regulated aquatic resources are absent from a project site or will not be impacted by the action, no other measures are recommended and the habitat assessment shall be submitted to the City of Wildomar Community Development Department and USACE. If it is determined that potentially regulated aquatic resources may be impacted by the action, the delineation shall be submitted to the USACE, and a Preliminary Jurisdictional Determination or Approved Jurisdictional Determination shall be obtained. The project applicant shall obtain all required permits from the USACE and applicable agencies prior to the start of construction activities. Refer to Figure 5.4-16, Flow Chart to Guide Aquatic Resources Recommendations.

BIO-14 If an action requiring a discretionary approval is within or adjacent to a Core Area, Linkage, or wildlife movement corridor identified in the Western Riverside Multiple Species Habitat Conservation Plan (MSHCP) or a project-specific biological analysis, a qualified biologist shall, prior to any ground disturbance, prepare and submit to the City a wildlife movement evaluation for the proposed project to assess whether the project has the potential to substantially interfere with the movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors, or impede the use of native wildlife nursery sites. The City shall review the evaluation and in doing so may confer with any/all applicable resource agencies (e.g. CDFW, USFWS, NMFS) to assess the extent of any such impacts and impose conditions requiring the implementation of appropriate and feasible measures such as avoidance, design alteration, overcrossings, or other measures to reduce any such potentially significant impacts to the greatest extent feasible.

Future Project
Applicants and
Qualified Biologist
Prior to the Start of
Ground Disturbing
Activities
City of Wildomar
Community
Development
Department and
Appropriate
Regulatory Agency

CULTURAL RESOURCES
CUL-1 Site-Specific Cultural Resources Study and Evaluation of Resources. For projects that are on land that has not previously been developed, or will involve construction on areas where no previous ground disturbance or excavation has occurred, or for structures that are 50 years of age, a site-specific cultural resources study shall be completed prior to project approval. This site-specific cultural resources study shall include, but not be limited to a, records search with the California Historical Resource Future Project
Applicants and
Qualified Cultural
Resources
Specialist
Prior to the Start of
Ground-Disturbing
Activities
City of Wildomar
Community
Development
Department
I
3337

MITIGATION MONITORING & REPORTING PROGRAM FOR THE CITY OF W I LDOMAR PROPOSED GENERAL PLAN EIR

CITY OF WILDOMAR

3. Mitigation Monitoring Requirements
October 2024 Page 21
Table 3-1 Mitigation Monitoring Requirements
Mitigation Measure
Responsibility for
Implementation Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
(Date of Compliance)
Information System, review of historical documents, a Sacred Lands File search with the NAHC, and a field survey/site effort. The findings of the study shall be submitted as a report that follows the California Office of Historic Preservation’s recommended content and format. The report will provide the historic context, methods, results, and recommendations for appropriate findings.

CUL-2 Human Remains. If potential human remains are encountered, State Health and Safety Code Section 7050.5 states that no further disturbance shall occur until the Riverside County Coroner has made the necessary findings as to origin. Further, pursuant to Public Resource Code Section 5097.98(b) remains shall be left in place and free from disturbance until a final decision as to the treatment and disposition has been made. If the Riverside County Coroner determines the remains to be Native American, the Native American Heritage Commission shall be contacted within the period specified by law (24 hours). Subsequently, the Native American Heritage Commission shall identify the "most likely descendant" (MLD). The MLD shall then make recommendations and engage in consultation concerning the treatment of the remains as provided in Public Resources Code Section 5097.98. No photographs are to be taken of any human remains and/or cremations except by the coroner, with written approval by the consulting tribe(s).

Future Project
Applicants and
Professional
Archaeologist
During GroundDisturbing ActivitiesCity of Wildomar
Community
Development
Department

GEOLOGY AND SOILS
GEO-1 The project applicant/developer shall incorporate the recommendations of a project’s geotechnical report into project plans related to a proposed project. A project’s building plans shall demonstrate that they incorporate all applicable recommendations of the geotechnical report and comply with all applicable requirements of the latest adopted version of the California Building Code. The project applicant/developer shall incorporate the recommendations of a project’s geotechnical report into project plans related to a proposed project. A project’s building plans shall demonstrate that they incorporate all applicable recommendations of the geotechnical report and comply with all applicable requirements of the latest adopted version of the California Building Code.

Future Project
Applicants and
Licensed
Professional
Engineer
During Building Plan
Check, Prior to Any
Ground-Disturbing
Activities
City of Wildomar
Building and Safety
Department and
Community
Development
Department
GEO-2 Prior to issuance of a grading permit, the project applicant shall retain a Certified Paleontologist to assess the potential for presence of paleontological resources and the potential for project construction to affect such resources if present. If it is Future Project
Applicants and
Certified
Paleontologist
Prior to Issuance of a
Grading Permit
City of Wildomar
Community
Development
Department
3338

MITIGATION MONITORING & REPORTING PROGRAM FOR THE CITY OF W I LDOMAR PROPOSED GENERAL PLAN EIR

CITY OF WILDOMAR

3. Mitigation Monitoring Requirements

Page 22 ends

Table 3-1 Mitigation Monitoring Requirements
Mitigation Measure
Responsibility for
Implementation Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
(Date of Compliance)
determined, to the satisfaction of the City, that there is low potential for discovery or disturbance of paleontological resources, no further action shall be required.

If potential for discovery is deemed moderate to high, the project applicant shall retain a Certified Paleontologist to monitor all initial ground-disturbing activities in native soils or sediments. If the paleontologist, upon observing initial earthwork, determines there is low potential for discovery, no further action shall be required, and the paleontologist shall submit a memo to the City confirming findings of low potential.

Should any paleontological resources (i.e., fossils) be uncovered during project construction activities, all work within a 100-foot radius of the discovery site shall be halted or diverted to other areas on the site and the City shall be immediately notified.

A Certified Paleontologist shall evaluate the finds and recommend appropriate next steps to ensure that the resource is not substantially adversely impacted, including but not limited to avoidance, preservation in place, excavation, documentation, curation, data recovery, or other appropriate measures.

Further ground disturbance shall not resume within a 100-foot radius of the discovery site until an agreement has been reached between the project applicant, a Certified Paleontologist, and the City as to the appropriate preservation or mitigation measures to ensure that the resource is not substantially adversely impacted.

Salvage and collection of significant fossils shall be done in accordance with the Society of Vertebrate Paleontology guidelines. Any paleontological resources salvaged shall be provided for curation at a local curation facility, or any other local museum or repository, such as the Western Science Center or World Museum of Natural History, willing and able to accept and house the resource to preserve for future scientific study.

GREENHOUSE GAS EMISSIONS
GHG-1 The City of Wildomar shall participate in implementation and future updates of the Subregional Climate Action Plan (CAP) led by the Western Riverside Council of Government (WRCOG) with a focus on strategies that provide community-wide greenhouse gas (GHG) emission reductions in the City’s planning area. The City shall conduct regular monitoring and reporting of community-wide GHG emissions to ensure progress toward reducing community-wide GHGs and work with WRCOG and City of Wildomar
Public Works and
Engineering
Department and
Community
Development
Department
During Future
Updates of the
Subregional CAP
City of Wildomar
Public Works and
Engineering
Department and
Community
Development
Department
3339

MITIGATION MONITORING & REPORTING PROGRAM FOR THE CITY OF W I LDOMAR PROPOSED GENERAL PLAN EIR

CITY OF WILDOMAR

3. Mitigation Monitoring Requirements
October 2024 Page 23
Table 3-1 Mitigation Monitoring Requirements
Mitigation Measure
Responsibility for
Implementation Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
(Date of Compliance)
partners to update the Subregional CAP on a regulator basis to ensure long-term reduction in GHG emissions.

The City shall prepare a list of quantified GHG reduction measures or best management practices for use by new development subject to the City’s discretionary review process, that are consistent with the Subregional CAP. The City shall require that Applicants for new development that would result in significant GHG emissions impacts, be required to implement the GHG reduction measures or best management practices identified on the list prepared by the City, if determined to be applicable for the project.

Examples of mitigation measures that may be considered, include the following:
 Measures that encourage transit use, carpooling, bike-share and car-share programs, active transportation, and parking strategies, including, but not limited to the following:
- Promote transit-active transportation coordinated strategies; - Increase bicycle carrying capacity on transit and rail vehicles; - Improve or increase access to transit;
- Increase access to common goods and services, such as groceries, schools, and day care;
- Incorporate the neighborhood electric vehicle network; - Orient the project toward transit, bicycle and pedestrian facilities; - Improve pedestrian or bicycle networks, or transit service; - Provide traffic calming measures;
- Limit or eliminate park supply;
- Unbundle parking costs;
- Provide parking cash-out programs;
- Implement or provide access to commute reduction program;  Require at least five percent of all vehicle parking spaces include electric vehicle charging stations;
 Adopting employer trip reduction measures to reduce employee trips such as vanpool and carpool programs, providing end-of-trip facilities, and telecommuting programs including but not limited to measures that:
- Provide car-sharing, bike sharing, and ride-sharing programs; 3340

MITIGATION MONITORING & REPORTING PROGRAM FOR THE CITY OF W I LDOMAR PROPOSED GENERAL PLAN EIR

CITY OF WILDOMAR

3. Mitigation Monitoring Requirements

Page 24 ends

Table 3-1 Mitigation Monitoring Requirements
Mitigation Measure
Responsibility for
Implementation Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
(Date of Compliance)
- Provide transit passes;
- Shift single occupancy vehicle trips to carpooling or vanpooling, for example providing ride-matching services;
- Provide incentives or subsidies that increase that use of modes other than single occupancy vehicle;
- Provide on-site amenities at places of work, such as priority parking for carpools and vanpools, secure bike parking, and showers and locker rooms; - Provide employee transportation coordinators at employment sites; and - Provide a guaranteed ride home service to users of non-auto modes.  Provide maximum future coverage of solar panels and installing the maximum solar power generation capacity feasible;
 Oversizing electrical rooms by 25 percent or providing a secondary electrical room to accommodate future expansion of electric vehicle charging capability;  Running conduit to designated locations for future electric truck charging stations.

HAZARDS AND HAZARDOUS MATERIALS
HAZ-1 Prior to the issuance of building permits for all projects, the project applicant/developer shall demonstrate, to the satisfaction of the City Building Official and the Riverside County Fire Chief, compliance with the 2022 California Building Code (or the most recent edition) (Part 2 of Title 24 of the California Code of Regulations) and the 2022 California Fire Code (or the most recent edition) (Part 9 of Title 24 of the California Code of Regulations), including those regulations pertaining to materials and construction methods intended to mitigate wildfire exposure as described in the 2022 California Building Code and California Residential Code (or most recent edition); specifically California Building Code Chapter 7A; California Residential Code Section R327; California Residential Code Section R337; California Referenced Standards Code Chapter 12 7A; and California Fire Code
City Building Official
and the Riverside
County Fire Chief
Prior to the Issuance
of Building Permits
City of Wildomar
Building Department
and Riverside
County Fire
Department
HAZ-2 Prior to the issuance of a certificate of occupancy for all projects, the applicant shall demonstrate, to the satisfaction of the City Building Official and the County Fire Chief, compliance with the vegetation management requirements prescribed in California Fire Code Section 4906 and California Government Code Section 51182.

City Building Official
and the County Fire
Chief
Prior to the Issuance
of a Certificate of
Occupancy
City of Wildomar
Building Department
and Riverside
County Fire
Department
3341

MITIGATION MONITORING & REPORTING PROGRAM FOR THE CITY OF W I LDOMAR PROPOSED GENERAL PLAN EIR

CITY OF WILDOMAR

3. Mitigation Monitoring Requirements
October 2024 Page 25
Table 3-1 Mitigation Monitoring Requirements
Mitigation Measure
Responsibility for
Implementation Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
(Date of Compliance)

MINERAL RESOURCES
MIN-1 Prior to blasting non-rippable bedrock within 100 feet of the federal lode, outcrops shall be inspected for pegmatite dikes or other geological features considered favorable for gemstones or rare earth elements by an experienced igneous petrologist with a master’s degree and/or Ph.D. in Geology. If geological units containing museum quality gemstones or anomalously high concentrations of rare earth elements are found, representative specimens shall be documented and provided to an accredited repository such as the University of California, Riverside Earth and Planetary Sciences Museum, the Western Science Center in Riverside County, or any other local museum or repository willing and able to accept and house the resources to preserve for future scientific study.

Future Project
Applicants and
Experienced
Igneous Petrologist
Prior to Blasting NonRippable Bedrock
Within 100 Feet of
the Federal Lode
City of Wildomar
Public Works and
Engineering
Department and
Community
Development
Department
NOISE
N-1 Construction Noise Measures. Construction contractors shall implement the following measures for construction activities conducted in the City of Wildomar. Construction plans submitted to the City shall identify these measures on demolition, grading, and construction plans. The City of Wildomar shall verify that grading, demolition, and/or construction plans submitted to the City include these notations prior to issuance of demolition, grading, and/or building permits.
 During the entire active construction period, equipment and trucks used for project construction shall use the best-available noise control techniques (e.g., improved mufflers, equipment redesign, use of intake silencers, ducts, engine enclosures, and acoustically attenuating shields or shrouds), wherever feasible to maintain construction noise levels at or below the performance standard of 80 dBA Leq.

Proper mufflers and/or silencers can achieve a 4 to 5 dBA reduction, while engine enclosers can achieve 8 to 10 dBA reduction
 Impact tools (e.g., jack hammers and hoe rams) shall be hydraulically or electrically powered wherever possible. Where the use of pneumatic tools is unavoidable, an exhaust muffler on the compressed air exhaust shall be used along with external noise jackets on the tools to maintain construction noise levels at or below the performance standard of 80 dBA Leq. Pneumatic tools typically measure at a noise level of 6 to 8 dBA lower than impact tools.

Future Project
Applicants and
Construction
Contractor
Prior to Issuance of
Demolition, Grading,
and/or Building
Permits and During
Construction
Activities
City of Wildomar
Community
Development
Department and
Building and Safety
Department
I
3342

MITIGATION MONITORING & REPORTING PROGRAM FOR THE CITY OF W I LDOMAR PROPOSED GENERAL PLAN EIR

CITY OF WILDOMAR

3. Mitigation Monitoring Requirements

Page 26 ends

Table 3-1 Mitigation Monitoring Requirements
Mitigation Measure
Responsibility for
Implementation Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
(Date of Compliance)
 Stationary equipment, such as generators and air compressors, shall be located as far as feasible from nearby noise-sensitive uses.
 Stockpiling shall be located as far as feasible from nearby noise-sensitive receptors.
 Construction traffic shall be limited, to the extent feasible, to approved haul routes established by the City Planning and Building Agency.
 At least 10 days prior to the start of construction activities, a sign shall be posted at the entrance(s) to the job site, clearly visible to the public, that includes permitted construction days and hours, as well as the telephone numbers of the City’s and contractor’s authorized representatives that are assigned to respond in the event of a noise or vibration complaint. If the authorized contractor’s representative receives a complaint, he/she shall investigate, take appropriate corrective action, and report the action to the City.
 As noted in 13 CCR 2480 & 2485 under CARB, any law enforcement department, including air districts and CARB, can fine a 10,000 pound or greater truck owner and driver up to $1000 per day for illegal idling. Signs shall be posted at the job site entrance(s), within the on-site construction zones, and along queueing lanes (if any) to reinforce the prohibition of unnecessary engine idling. All other equipment shall be turned off if not in use for more than 5 minutes.  During the entire active construction period and to the extent feasible, the use of noise-producing signals, including horns, whistles, alarms, and bells, shall be for safety warning purposes only. The construction manager shall use smart back-up alarms, which automatically adjust the alarm level based on the background noise level or switch off back-up alarms and replace with human spotters in compliance with all safety requirements and laws.
 If construction is anticipated for prolonged periods, as required by the Community Development Director, erect temporary noise barriers (at least as high as the exhaust of equipment and breaking line-of-sight between noise sources and sensitive receptors), as necessary and feasible, to maintain construction noise levels at or below the performance standard of 80 dBA Leq. Barriers shall be constructed with a solid material that has a density of at least 4 pounds per square foot with no gaps from the ground to the top of the barrier. 3343

MITIGATION MONITORING & REPORTING PROGRAM FOR THE CITY OF W I LDOMAR PROPOSED GENERAL PLAN EIR

CITY OF WILDOMAR

3. Mitigation Monitoring Requirements
October 2024 Page 27
Table 3-1 Mitigation Monitoring Requirements
Mitigation Measure
Responsibility for
Implementation Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
(Date of Compliance)
N-2 Vibration Analysis. Prior to issuance of a building permit for a project requiring pile driving during construction within 135 feet of fragile structures, such as historical resources, within 100 feet of nonengineered timber and masonry buildings (e.g., most residential buildings), or within 75 feet of engineered concrete and masonry (no plaster); or a vibratory roller within 25 feet of any structure, the project applicant shall prepare a noise and vibration analysis to assess and mitigate potential noise and vibration impacts related to these activities. This vibration analysis shall be conducted by a qualified and experienced acoustical consultant or engineer. The vibration levels shall not exceed Federal Transit Administration (FTA) architectural damage thresholds (e.g., 0.12 inches per second [in/sec] peak particle velocity [PPV] for fragile or historical resources, 0.2 in/sec PPV for nonengineered timber and masonry buildings, and 0.3 in/sec PPV for engineered concrete and masonry). If vibration levels would exceed these thresholds, alternative methods shall be used, such as drilling piles instead of pile driving and static rollers instead of vibratory rollers. If necessary, construction vibration monitoring shall be conducted to ensure vibration thresholds are not exceeded.

Future Project
Applicants and
Qualified Acoustical
Consultant
Prior to Issuance of a
Building Permit
City of Wildomar
Community and
Development
Department and
Building and Safety
Department
N-3 Vibration Analysis. Prior to discretionary approval by the City of Wildomar for industrial development projects subject to review under the California Environmental Quality Act (CEQA) (i.e., nonexempt projects) that utilize equipment that has the potential to result in vibration, a vibration analysis shall be conducted to assess and mitigate potential vibration impacts. This vibration analysis shall be conducted by a qualified and experienced acoustical consultant or engineer and shall follow the latest CEQA guidelines, practices, and precedents.

Future Project
Applicants and
Qualified Acoustical
Consultant
Prior to Discretionary
Approval for
Industrial Projects
City of Wildomar
Community and
Development
Department and
Building and Safety
Department
3344

MITIGATION MONITORING & REPORTING PROGRAM FOR THE CITY OF W I LDOMAR PROPOSED GENERAL PLAN EIR

CITY OF WILDOMAR

3. Mitigation Monitoring Requirements

Page 28 ends

Table 3-1 Mitigation Monitoring Requirements
Mitigation Measure
Responsibility for
Implementation Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
(Date of Compliance)

TRIBAL CULTURAL RESOURCES
TCR-1 Inadvertent Archeological Find. If during ground disturbance activities, cultural resources are discovered that were not assessed by the archaeological report(s) and/or environmental assessment conducted prior to project approval, the following procedures shall be followed. Cultural resources are defined as being multiple artifacts in close association with each other, but also include fewer artifacts if the area of the find is determined to be of significance due to its sacred or cultural importance as determined in consultation with the lead agency and Native American Tribe(s) that elected to consult under AB 52 (“Consulting Tribe(s)”). a. All ground disturbance activities within 100 feet of the discovered cultural resources shall be halted until a meeting is convened between the developer, the archaeologist, the tribal representative(s) and the Community Development Director to discuss the significance of the find.
b. At the meeting, the significance of the discoveries shall be discussed and after consultation with the tribal representative(s), developer, and the archaeologist, a decision shall be made, with the concurrence of the Community Development Director, as to the appropriate mitigation (documentation, recovery, avoidance, etc.) for the cultural resources.
c. Grading or further ground disturbance shall not resume within the area of the discovery until an agreement has been reached by all parties as to the appropriate mitigation. Work shall be allowed to continue outside of the buffer area and will be monitored by additional Tribal monitors if needed. d. Treatment and avoidance of the newly discovered resources shall be consistent with the Treatment and Monitoring Agreements entered into with the Consulting Tribe(s) and the applicant. This may include avoidance of the cultural resources through project design, in-place preservation of cultural resources located in native soils and/or re-burial on the Project property so they are not subject to further disturbance in perpetuity as identified in Mitigation Measures TCR-2 and TCR-7.
e. If the find is determined to be significant and avoidance of the site has not been achieved, a Phase III data recovery plan (see Mitigation Measure TCR-6) shall be prepared by the project archeologist, in consultation with the Consulting Tribe(s), and shall be submitted to the City for their review and approval prior to implementation of the said plan.

Future Project
Applicants and
Professional
Archaeologist
During GroundDisturbing ActivitiesCity of Wildomar
Community
Development
Department
3345

MITIGATION MONITORING & REPORTING PROGRAM FOR THE CITY OF W I LDOMAR PROPOSED GENERAL PLAN EIR

CITY OF WILDOMAR

3. Mitigation Monitoring Requirements
October 2024 Page 29
Table 3-1 Mitigation Monitoring Requirements
Mitigation Measure
Responsibility for
Implementation Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
(Date of Compliance)
f. Pursuant to Calif. Pub. Res. Code § 21083.2(b) avoidance is the preferred method of preservation for archaeological resources and tribal cultural resources. If the landowner and the Consulting Tribe(s) cannot agree on the significance or the mitigation for the archaeological or tribal cultural resources, these issues will be presented to the Community Development Director for decision. The City’s Community Development Director shall make the determination based on the provisions of the California Environmental Quality Act with respect to archaeological and tribal cultural resources, recommendations of the project archeologist, and shall take into account the cultural and religious principles and practices of the Consulting Tribe(s).

Notwithstanding any other rights available under the law, the decision of the City Community Development Director shall be appealable to the City Planning Commission and/or City Council.

TCR-2 Cultural Resources Disposition. In the event that Native American cultural resources are discovered during the course of grading (inadvertent discoveries), the following procedures shall be carried out for final disposition of the discoveries:
a. One or more of the following treatments, in order of preference, as numbered below, shall be employed with the Consulting Tribe(s). Evidence of such shall be provided to the City of Wildomar Community Development Department:
i. Preservation-In-Place of the cultural resources, if feasible. Preservation in place means avoiding the resources, leaving them in the place where they were found with no development affecting the integrity of the resources. ii. Reburial of the resources on the Project property. The measures for reburial shall include, at least, the following: Measures and provisions to protect the future reburial area from any future impacts in perpetuity.

Reburial shall not occur until all legally required cataloging and basic recordation have been completed, with an exception that sacred items, burial goods and Native American human remains are excluded. Any reburial process shall be culturally appropriate. Listing of contents and location of the reburial shall be included in the confidential Phase IV report (see Mitigation Measure TCR-6). The Phase IV Report shall be filed with Future Project
Applicants and
Professional
Archaeologist
During Grading
Activities
City of Wildomar
Community
Development
Department
3346

MITIGATION MONITORING & REPORTING PROGRAM FOR THE CITY OF W I LDOMAR PROPOSED GENERAL PLAN EIR

CITY OF WILDOMAR

3. Mitigation Monitoring Requirements

Page 30 ends

Table 3-1 Mitigation Monitoring Requirements
Mitigation Measure
Responsibility for
Implementation Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
(Date of Compliance)
the City under a confidential cover and not subject to Public Records Request.
iii. If preservation in place or reburial is not feasible then the resources shall be curated in a culturally appropriate manner at a Riverside County curation facility that meets State Resources Department Office of Historic Preservation Guidelines for the Curation of Archaeological Resources ensuring access and use pursuant to the Guidelines. The collection and associated records shall be transferred, including title, and are to be accompanied by payment of the fees by the Applicant necessary for permanent curation. Evidence of curation in the form of a letter from the curation facility stating that subject archaeological materials have been received and that all fees have been paid, shall be provided by the landowner to the City. There shall be no destructive or invasive testing on sacred items, burial goods, and Native American human remains, as defined by the cultural and religious practices of the Most Likely Descendant. Results concerning finds of any inadvertent discoveries shall be included in the Phase IV monitoring report.

TCR-3 Archaeologist Retained. Prior to issuance of a grading permit the project applicant shall retain a Riverside County qualified Registered Professional Archaeologist (RPA), to monitor all ground disturbing activities in an effort to identify any unknown archaeological resources.

The Registered Professional Archaeologist and the Tribal monitor(s) required by Mitigation Measures TCR-4 and TCR-5 shall manage and oversee monitoring for all initial ground disturbing activities and excavation of each portion of the project site including clearing, grubbing, tree removals, mass or rough grading, trenching, stockpiling of materials, rock crushing, structure demolition and etc. The Registered Professional Archaeologist and the Tribal monitor(s), shall independently have the authority to temporarily divert, redirect or halt the ground disturbance activities to allow identification, evaluation, and potential recovery of cultural resources in coordination with any required special interest or tribal monitors.

The developer/permit holder shall submit a fully executed copy of the contract to the Community Development Department to ensure compliance with this condition of Future Project
Applicants,
Registered
Professional
Archaeologist, and
the Tribal Monitor
Prior to Issuance of a
Grading Permit
The City of Wildomar
Community
Development
Department
3347

MITIGATION MONITORING & REPORTING PROGRAM FOR THE CITY OF W I LDOMAR PROPOSED GENERAL PLAN EIR

CITY OF WILDOMAR

3. Mitigation Monitoring Requirements
October 2024 Page 31
Table 3-1 Mitigation Monitoring Requirements
Mitigation Measure
Responsibility for
Implementation Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
(Date of Compliance)
approval. Upon verification, the Community Development Department shall clear this condition.

In addition, the Registered Professional Archaeologist, in consultation with the Consulting Tribe(s), the contractor, and the City, shall develop a Cultural Resources Management Plan (CRMP) pursuant to the definition in AB 52 to address the details, timing and responsibility of all archaeological and cultural activities that will occur on the project site. A consulting tribe is defined as a tribe that initiated the AB 52 tribal consultation process for the Project, has not opted out of the AB 52 consultation process, and has completed AB 52 consultation with the City as provided for in Cal.

Pub. Res. Code Section 21080.3.2(b)(1) of AB 52. Details in the Plan shall include:
a. Project grading and development scheduling;
b. The Project archaeologist and the Consulting Tribes(s) shall attend the pregrading meeting with the City, the construction manager and any contractors and will conduct a mandatory Cultural Resources Worker Sensitivity Training to those in attendance. The Training will include a brief review of the cultural sensitivity of the Project and the surrounding area; what resources could potentially be identified during earthmoving activities; the requirements of the monitoring program; the protocols that apply in the event inadvertent discoveries of cultural resources are identified, including who to contact and appropriate avoidance measures until the find(s) can be properly evaluated; and any other appropriate protocols. All new construction personnel that will conduct earthwork or grading activities that begin work on the Project following the initial Training must take the Cultural Sensitivity Training prior to beginning work and the Project archaeologist and Consulting Tribe(s) shall make themselves available to provide the training on an as-needed basis;
c. The protocols and stipulations that the contractor, City, Consulting Tribe(s) and Project archaeologist will follow in the event of inadvertent cultural resources discoveries, including any newly discovered cultural resource deposits that shall be subject to a cultural resources evaluation.
3348

MITIGATION MONITORING & REPORTING PROGRAM FOR THE CITY OF W I LDOMAR PROPOSED GENERAL PLAN EIR

CITY OF WILDOMAR

3. Mitigation Monitoring Requirements

Page 32 ends

Table 3-1 Mitigation Monitoring Requirements
Mitigation Measure
Responsibility for
Implementation Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
(Date of Compliance)
TCR-4 Native American Monitoring (Pechanga). Tribal monitor(s) shall be required on-site during all ground-disturbing activities, including grading, stockpiling of materials, engineered fill, rock crushing, etc. The land divider/permit holder shall retain a qualified tribal monitor(s) from the Pechanga Band of Luiseno Indians. Prior to issuance of a grading permit, the developer shall submit a copy of a signed contract between the above-mentioned Tribe and the land divider/permit holder for the monitoring of the project to the Community Development Department and to the Engineering Department. The Tribal Monitor(s) shall have the authority to temporarily divert, redirect or halt the ground-disturbance activities to allow recovery of cultural resources, in coordination with the Project Archaeologist.

Future Project
Applicants and
Tribal Monitor
During GroundDisturbing ActivitiesCity of Wildomar
Community
Development
Department and
Public Works and
Engineering
Department
TCR-5 Native American Monitoring (Soboba). Tribal monitor(s) shall be required on-site during all ground-disturbing activities, including grading, stockpiling of materials, engineered fill, rock crushing, etc. The land divider/permit holder shall retain a qualified tribal monitor(s) from the Soboba Band of Luiseno Indians. Prior to issuance of a grading permit, the developer shall submit a copy of a signed contract between the above-mentioned Tribe and the land divider/permit holder for the monitoring of the project to the Community Development Department and to the Engineering Department. The Tribal Monitor(s) shall have the authority to temporarily divert, redirect or halt the ground-disturbance activities to allow recovery of cultural resources, in coordination with the Project Archaeologist.

Future Project
Applicants and
Tribal Monitor
During GroundDisturbing ActivitiesCity of Wildomar
Community
Development
Department and
Public Works and
Engineering
Department
TCR-6 Archeology Report - Phase III and IV. Prior to final inspection, the developer/permit holder shall prompt the Project Archeologist to submit two (2) copies of the Phase III Data Recovery report (if required for the Project) and the Phase IV Cultural Resources Monitoring Report. The Phase IV report shall include evidence of the required cultural/historical sensitivity training for the construction staff held during the pre-grade meeting. The Community Development Department shall review the reports to determine adequate mitigation compliance. Provided the reports are adequate, the Community Development Department shall clear this condition. Once the report(s) are determined to be adequate, two (2) copies shall be submitted to the Eastern Information Center (EIC) at the University of California Riverside (UCR) and one (1) copy shall be submitted to the Consulting Tribe(s) Cultural Resources Department(s).

Future Project
Applicants and
Qualified
Archaeologist
Prior to Final
Inspection
City of Wildomar
Community
Development
Department
3349

MITIGATION MONITORING & REPORTING PROGRAM FOR THE CITY OF W I LDOMAR PROPOSED GENERAL PLAN EIR

CITY OF WILDOMAR

3. Mitigation Monitoring Requirements
October 2024 Page 33
Table 3-1 Mitigation Monitoring Requirements
Mitigation Measure
Responsibility for
Implementation Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
(Date of Compliance)
TCR-7 Non-Disclosure of Reburial Locations. It is understood by all parties that unless otherwise required by law, the site of any reburial of Native American human remains or associated grave goods shall not be disclosed and shall not be governed by public disclosure requirements of the California Public Records Act. The Coroner, pursuant to the specific exemption set forth in California Government Code Section 6254 (r)., parties, and Lead Agencies, will be asked to withhold public disclosure information related to such reburial.

Future Project
Applicants and
Professional
Archaeologist
During Discovery of
Native American
Human Remains
City of Wildomar
Community
Development
Department
TCR-8 No-Build Easement or Similar Instrument. In the event that Native American artifacts are found and buried within the project vicinity, a no-build easement, or similar legal instrument, shall be used to preclude future development from taking place on the reburial site(s).

City of Wildomar
Community
Development
Department
Before Reburial of
Native American
Artifacts
City of Wildomar
Community
Development
Department

WILDFIRE
See Mitigation Measures HAZ-1 and HAZ-2.

I
3350

MITIGATION MONITORING & REPORTING PROGRAM FOR THE CITY OF W I LDOMAR PROPOSED GENERAL PLAN EIR

CITY OF WILDOMAR

3. Mitigation Monitoring Requirements

Page 34 ends

This page intentionally left blank.
3351
October 2024 Page 35

4. Mitigation Monitoring Reports
Mitigation monitoring reports are required to document compliance with the Mitigation Monitoring Program and to resolve disputes. Specific reports include:
 Field Check Report
 Implementation Compliance Report
 Dispute/Enforcement Report

4.1 FIELD CHECK REPORT
Field check reports are required to record in-field compliance and conditions.

4.2 IMPLEMENTATION COMPLIANCE REPORT
The Implementation Compliance Report (ICR) is prepared to document the implementation of mitigation measures on a phased basis, based on the information in Table 3-1. The report summarizes implementation compliance, including mitigation measures, date completed, and monitor’s signature.

4.3 DISPUTE/ENFORCEMENT REPORT
The Dispute/Enforcement Report (DER) is prepared to document the outcome of the Project Manager or City Manager and becomes a portion of the ICR.
3352

MITIGATION MONITORING & REPORTING PROGRAM FOR THE CITY OF W I LDOMAR PROPOSED GENERAL PLAN EIR

CITY OF WILDOMAR

4. Mitigation Monitoring Reports

Page 36 ends

This page intentionally left blank.
3353
October 2024 Page 37

5. Community Involvement
Monitoring reports are public documents and are available for review by the general public. Discrepancies in monitoring reports can be taken to the Project Manager or Community Development Director by the general public.
3354

MITIGATION MONITORING & REPORTING PROGRAM FOR THE CITY OF W I LDOMAR PROPOSED GENERAL PLAN EIR

CITY OF WILDOMAR

5. Community Involvement

Page 38 ends

This page intentionally left blank.
3355
October 2024 Page 39

6. Report Preparation

6.1 LIST OF PREPARERS
City of Wildomar
Matthew C. Bassi, Community Development Director
PlaceWorks
Mark Teague, AICP, Managing Principal
Jasmine Osman, Associate II
Joseph Ruiz, Planner
3356

MITIGATION MONITORING & REPORTING PROGRAM FOR THE CITY OF W I LDOMAR PROPOSED GENERAL PLAN EIR

CITY OF WILDOMAR

6. Report Preparation

Page 40 ends

This page intentionally left blank.
3357
EL
a
k?s'R
or
f' l j ---�-Jt--
:;:f
~1c "-~-
�-"1
.:s- "I
\
----- -..
' '
< >"
( ✓ I..
( �

NEW ZONING - CITYWIDE
- - - - Other Jurisdictions
L_J City Boundary
Parcels
New Zoning - C-G - C-H - M-C
M-1 - MUH
MUL
- OS
PF
R-1
- R-2
, .. - ;
ENVISION WILDOMAR 2040 November 2024
3358
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
380160003 4.77 C-1/C-P MUH MUPA MUH GP- Rename
380160004 3.74 C-1/C-P MUH MUPA MUH GP- Rename
380160005 1.78 C-1/C-P MUH MUPA MUH GP- Rename
380160006 1.59 C-1/C-P MUH MUPA MUH GP- Rename
380160007 4.34 C-1/C-P MUH MUPA MUH GP- Rename
380160008 3.53 C-1/C-P MUH MUPA MUH GP- Rename
380160009 3.29 C-1/C-P MUH MUPA MUH GP- Rename
376410015 2.40 C-P-S MUH MUPA MUH GP- Rename
376410016 2.40 C-P-S MUH MUPA MUH GP- Rename
376410017 2.40 C-P-S MUH MUPA MUH GP- Rename
376410021 1.84 C-P-S MUH MUPA MUH GP- Rename
362250029 2.60 R-R MUH MUPA MUH GP- Rename
367050064 5.77 R-R MUH MUPA MUH GP- Rename
367050068 6.41 R-R MUH MUPA MUH GP- Rename
376190001 2.75 R-R MUH MUPA MUH GP- Rename
366300083 8.65 C-1/C-P C-G CR BP GP Update
370320018 6.38 C-1/C-P C-G BP CR GP Update
376060007 1.04 R-R C-G MHDR CR GP Update
376060009 0.34 R-R C-G MHDR CR GP Update
376070027 2.02 R-R C-G VLDR CR GP Update
376160001 0.43 R-R C-G MDR CR GP Update
376160005 0.29 R-R C-G MDR CR GP Update
376160006 0.41 R-R C-G MDR CR GP Update
376160009 0.40 R-R C-G MDR CR GP Update
376160010 0.29 R-R C-G MDR CR GP Update
376160015 0.54 R-R C-G MDR CR GP Update
376170002 1.83 R-R C-G MDR CR GP Update
376190002 6.11 C-P-S C-H MUPA CO GP Update
376190002 10.33 C-P-S C-H MUPA CR GP Update
370060015 1.14 C-1/C-P M-I CR LI GP Update
380290002 4.29 M-SC M-I BP LI GP Update
380220001 8.72 C-1/C-P MUH CR MUH GP Update
380230004 32.11 C-1/C-P MUH CR MUH GP Update
380270003 4.99 C-1/C-P MUH CR MUH GP Update
380270004 4.60 C-1/C-P MUH CR MUH GP Update
380270007 4.79 C-1/C-P MUH CR MUH GP Update
380270008 4.63 C-1/C-P MUH CR MUH GP Update
370171015 8.03 C-P-S MUH CR MUH GP Update
376320001 32.09 C-P-S MUH CR MUH GP Update
380230002 21.58 C-P-S MUH CR MUH GP Update
380230003 29.77 C-P-S MUH CR MUH GP Update
380230007 11.90 C-P-S MUH CR MUH GP Update
380260009 16.81 C-P-S MUH CR MUH GP Update
380260010 3.69 C-P-S MUH CR MUH GP Update
380260011 4.14 C-P-S MUH CR MUH GP Update
380260012 0.62 C-P-S MUH CR MUH GP Update
380270001 5.00 C-P-S MUH CR MUH GP Update
380270002 4.99 C-P-S MUH CR MUH GP Update
380270005 4.13 C-P-S MUH CR MUH GP Update
380270006 4.68 C-P-S MUH CR MUH GP Update
380270009 2.34 C-P-S MUH CR MUH GP Update
380270010 2.36 C-P-S MUH CR MUH GP Update
380270011 2.37 C-P-S MUH CR MUH GP Update
3359
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
380270012 2.39 C-P-S MUH CR MUH GP Update
380270014 1.64 C-P-S MUH CR MUH GP Update
376180012 3.60 M-SC MUH LI MUH GP Update
376330004 0.36 M-SC MUH BP MUH GP Update
376330024 6.74 M-SC MUH BP MUH GP Update
376330025 0.05 M-SC MUH BP MUH GP Update
365051004 0.69 C-1/C-P MUL CR MUL GP Update
365051005 0.17 C-1/C-P MUL CR MUL GP Update
365051006 0.17 C-1/C-P MUL CR MUL GP Update
365051007 0.17 C-1/C-P MUL CR MUL GP Update
365051010 0.18 C-1/C-P MUL CR MUL GP Update
365051014 0.17 C-1/C-P MUL CR MUL GP Update
365051025 0.25 C-1/C-P MUL CR MUL GP Update
365051028 0.34 C-1/C-P MUL CR MUL GP Update
365051029 0.34 C-1/C-P MUL CR MUL GP Update
365061001 0.12 C-1/C-P MUL CR MUL GP Update
365061002 0.13 C-1/C-P MUL CR MUL GP Update
365061003 0.19 C-1/C-P MUL CR MUL GP Update
365061028 0.13 C-1/C-P MUL CR MUL GP Update
365061029 0.22 C-1/C-P MUL CR MUL GP Update
365061034 0.33 C-1/C-P MUL CR MUL GP Update
365093016 0.44 C-1/C-P MUL CR MUL GP Update
365103021 0.15 C-1/C-P MUL CR MUL GP Update
365103022 0.15 C-1/C-P MUL CR MUL GP Update
365103023 0.15 C-1/C-P MUL CR MUL GP Update
365103024 0.16 C-1/C-P MUL CR MUL GP Update
365103025 0.15 C-1/C-P MUL CR MUL GP Update
365103032 0.37 C-1/C-P MUL CR MUL GP Update
365103033 0.34 C-1/C-P MUL VHDR MUL GP Update
365131003 0.16 C-1/C-P MUL CR MUL GP Update
365131004 0.06 C-1/C-P MUL CR MUL GP Update
365131005 0.39 C-1/C-P MUL CR MUL GP Update
366021001 0.33 C-1/C-P MUL CR MUL GP Update
366021002 0.20 C-1/C-P MUL CR MUL GP Update
366021003 0.23 C-1/C-P MUL CR MUL GP Update
366021007 0.79 C-1/C-P MUL CR MUL GP Update
366021011 0.38 C-1/C-P MUL CR MUL GP Update
366021012 0.31 C-1/C-P MUL CR MUL GP Update
380140008 2.34 C-1/C-P MUL CR MUL GP Update
380140013 2.63 C-1/C-P MUL CR MUL GP Update
366210002 1.15 C-P-S MUL CR MUL GP Update
366210046 0.74 C-P-S MUL CR MUL GP Update
366210047 0.88 C-P-S MUL CR MUL GP Update
366210048 1.43 C-P-S MUL CR MUL GP Update
366210049 2.91 C-P-S MUL CR MUL GP Update
380250002 19.33 C-P-S MUL CR MUL GP Update
370400005 0.60 R-3 MUL MHDR MUL GP Update
370400006 0.60 R-3 MUL MHDR MUL GP Update
370400007 0.60 R-3 MUL MHDR MUL GP Update
370400008 0.61 R-3 MUL MHDR MUL GP Update
365062018 0.16 R-R MUL VHDR MUL GP Update
365093010 0.15 R-R MUL VHDR MUL GP Update
365093011 0.15 R-R MUL VHDR MUL GP Update
3360
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
365093012 0.15 R-R MUL VHDR MUL GP Update
365093013 0.15 R-R MUL VHDR MUL GP Update
365093014 0.15 R-R MUL VHDR MUL GP Update
365093015 0.19 R-R MUL VHDR MUL GP Update
365103015 0.15 R-R MUL VHDR MUL GP Update
365103016 0.13 R-R MUL VHDR MUL GP Update
365103017 0.14 R-R MUL VHDR MUL GP Update
365103018 0.14 R-R MUL VHDR MUL GP Update
365103019 0.15 R-R MUL VHDR MUL GP Update
365103020 0.15 R-R MUL CR MUL GP Update
365111009 0.46 R-R MUL VHDR MUL GP Update
365111010 0.15 R-R MUL VHDR MUL GP Update
365111011 0.15 R-R MUL VHDR MUL GP Update
365111012 0.34 R-R MUL VHDR MUL GP Update
365111013 0.13 R-R MUL VHDR MUL GP Update
365111014 0.14 R-R MUL VHDR MUL GP Update
365111015 0.15 R-R MUL VHDR MUL GP Update
365111016 0.15 R-R MUL VHDR MUL GP Update
365111017 0.15 R-R MUL VHDR MUL GP Update
365111018 0.16 R-R MUL VHDR MUL GP Update
365131006 0.15 R-R MUL VHDR MUL GP Update
365131007 0.15 R-R MUL VHDR MUL GP Update
365131008 0.15 R-R MUL VHDR MUL GP Update
365131011 0.15 R-R MUL VHDR MUL GP Update
365131012 0.15 R-R MUL VHDR MUL GP Update
365131013 0.15 R-R MUL VHDR MUL GP Update
366021005 0.72 R-R MUL MHDR MUL GP Update
366021006 0.76 R-R MUL MHDR MUL GP Update
366021008 0.32 R-R MUL MHDR MUL GP Update
366021009 0.65 R-R MUL MHDR MUL GP Update
366023001 1.31 R-R MUL MHDR MUL GP Update
366023002 0.82 R-R MUL MHDR MUL GP Update
366023003 0.26 R-R MUL MHDR MUL GP Update
366023005 0.17 R-R MUL MHDR MUL GP Update
366023007 0.80 R-R MUL MHDR MUL GP Update
366023008 0.79 R-R MUL MHDR MUL GP Update
366023009 0.77 R-R MUL MHDR MUL GP Update
366031001 0.77 R-R MUL MHDR MUL GP Update
366031002 0.45 R-R MUL MHDR MUL GP Update
366031003 0.77 R-R MUL MHDR MUL GP Update
370171002 1.00 R-R MUL MHDR MUL GP Update
370171003 0.23 R-R MUL MHDR MUL GP Update
370171004 0.23 R-R MUL MHDR MUL GP Update
370171005 0.27 R-R MUL MHDR MUL GP Update
370171006 0.28 R-R MUL MHDR MUL GP Update
370171007 0.28 R-R MUL MHDR MUL GP Update
370171008 0.27 R-R MUL MHDR MUL GP Update
370171009 0.23 R-R MUL MHDR MUL GP Update
370171010 0.23 R-R MUL MHDR MUL GP Update
370171011 0.24 R-R MUL MHDR MUL GP Update
370171012 0.24 R-R MUL MHDR MUL GP Update
370171013 0.24 R-R MUL MHDR MUL GP Update
370171014 0.28 R-R MUL MHDR MUL GP Update
3361
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
370171016 0.96 R-R MUL MHDR MUL GP Update
370171017 0.97 R-R MUL MHDR MUL GP Update
370171018 0.96 R-R MUL MHDR MUL GP Update
370171019 0.97 R-R MUL MHDR MUL GP Update
370171024 3.56 R-R MUL MHDR MUL GP Update
370400018 0.84 R-R MUL MHDR MUL GP Update
370400019 0.21 R-R MUL MHDR MUL GP Update
370400020 0.28 R-R MUL MHDR MUL GP Update
370400021 0.28 R-R MUL MHDR MUL GP Update
370400022 0.28 R-R MUL MHDR MUL GP Update
370400025 0.28 R-R MUL MHDR MUL GP Update
370400026 0.28 R-R MUL MHDR MUL GP Update
370400027 0.28 R-R MUL MHDR MUL GP Update
370400036 0.29 R-R MUL MHDR MUL GP Update
370400037 2.29 R-R MUL MHDR MUL GP Update
370400038 0.51 R-R MUL MHDR MUL GP Update
370400039 0.42 R-R MUL MHDR MUL GP Update
370400040 0.34 R-R MUL MHDR MUL GP Update
370400041 0.42 R-R MUL MHDR MUL GP Update
370400042 0.42 R-R MUL MHDR MUL GP Update
370400043 0.42 R-R MUL MHDR MUL GP Update
370400044 0.21 R-R MUL MHDR MUL GP Update
370400045 0.29 R-R MUL MHDR MUL GP Update
370400046 0.49 R-R MUL MHDR MUL GP Update
370400047 0.49 R-R MUL MHDR MUL GP Update
370400048 0.49 R-R MUL MHDR MUL GP Update
370400049 0.49 R-R MUL MHDR MUL GP Update
380170001 1.35 R-R MUL MHDR MUL GP Update
380170024 0.03 R-R MUL CR MUL GP Update
362150008 65.33 R-1 OS RM OS-CH GP Update
362150028 6.66 R-1 OS LDR OS-CH GP Update
362170005 18.32 R-A OS LDR OS-CH GP Update
362130003 79.71 R-R OS RM OS-CH GP Update
362130019 83.48 R-R OS RM OS-CH GP Update
362130020 32.09 R-R OS RM OS-CH GP Update
362140014 55.76 R-R OS RM OS-CH GP Update
362150029 48.65 R-R OS RM OS-CH GP Update
362170001 194.90 R-R OS RM OS-CH GP Update
362170006 40.00 R-R OS RM OS-CH GP Update
362170009 13.05 R-R OS RM OS-CH GP Update
362170010 13.48 R-R OS LDR OS-CH GP Update
362170011 13.19 R-R OS LDR OS-CH GP Update
365190002 28.82 R-R OS EDR OS-CH GP Update
365210008 122.18 R-R OS RM OS-CH GP Update
365210044 160.13 R-R OS OS-CH OS-CH GP Update
365210048 37.19 R-R OS OS-CH OS-CH GP Update
365270096 21.27 R-R OS RM OS-CH GP Update
366220001 20.09 R-R OS OS-CH OS-CH GP Update
366310006 1.63 R-R OS RR OS-CH GP Update
366320001 79.17 R-R OS RR OS-CH GP Update
366320008 70.08 R-R OS RM OS-CH GP Update
366320012 13.65 R-R OS RM OS-CH GP Update
366320013 0.28 R-R OS RM OS-CH GP Update
3362
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
366320045 43.20 R-R OS LDR OS-CH GP Update
365051001 0.18 C-1/C-P OS CR OS-R GP Update
365051026 0.25 C-1/C-P OS CR OS-R GP Update
380150016 0.46 C-1/C-P OS CR OS-R GP Update
370500020 3.30 R-1 OS MDR OS-R GP Update
380140017 0.82 R-A-1/2 OS LDR OS-R GP Update
368230001 5.01 R-R OS LDR OS-R GP Update
368240003 2.00 R-R OS LDR OS-R GP Update
368240004 2.00 R-R OS LDR OS-R GP Update
380010003 7.12 R-R OS EDR-RC OS-R GP Update
380050025 20.08 R-R OS MDR OS-R GP Update
380080006 2.62 R-R OS MDR OS-R GP Update
380140014 12.57 R-R OS MDR OS-R GP Update
380160001 0.07 R-R OS MHDR OS-R GP Update
380470043 2.43 R-R OS MDR OS-R GP Update
376060016 1.55 C-1/C-P PF CR PF GP Update
376060031 1.33 C-1/C-P PF CR PF GP Update
370500021 9.89 R-1 PF MDR PF GP Update
366070012 11.27 R-R PF MDR PF GP Update
376060001 2.99 R-R PF MHDR PF GP Update
376060011 1.75 R-R PF CR PF GP Update
376060012 1.96 R-R PF CR PF GP Update
376141001 5.04 R-R PF MDR PF GP Update
376141002 5.02 R-R PF MDR PF GP Update
376330015 10.44 R-R PF MDR PF GP Update
376330016 0.82 R-R PF MDR PF GP Update
380010002 7.50 R-R PF EDR-RC PF GP Update
382280004 19.51 R-R PF EDR-RC PF GP Update
368060011 4.78 C-1/C-P R-1 CR MDR GP Update
368060012 4.78 C-1/C-P R-1 CR MDR GP Update
368060013 4.80 C-1/C-P R-1 CR MDR GP Update
368060014 4.82 C-1/C-P R-1 CR MDR GP Update
380170029 7.29 C-O R-1 CO MDR GP Update
367040030 2.33 C-P-S R-1 CR MDR GP Update
367040033 0.51 C-P-S R-1 CR MDR GP Update
367040034 0.58 C-P-S R-1 CR MDR GP Update
367040035 0.55 C-P-S R-1 CR MDR GP Update
367040036 0.64 C-P-S R-1 CR MDR GP Update
367210005 1.61 M-SC R-1 BP MDR GP Update
367210006 0.36 M-SC R-1 BP MDR GP Update
367210007 2.55 M-SC R-1 BP MDR GP Update
367210008 7.28 M-SC R-1 BP MDR GP Update
367210010 0.57 M-SC R-1 BP MDR GP Update
367210011 0.51 M-SC R-1 BP MDR GP Update
367210012 0.49 M-SC R-1 BP MDR GP Update
367210034 0.98 M-SC R-1 BP MDR GP Update
367210035 0.93 M-SC R-1 BP MDR GP Update
367210037 2.02 M-SC R-1 BP MDR GP Update
367210045 0.79 M-SC R-1 BP MDR GP Update
367210049 3.98 M-SC R-1 BP MDR GP Update
367210050 0.99 M-SC R-1 BP MDR GP Update
367210051 0.89 M-SC R-1 BP MDR GP Update
368060024 0.74 R-A R-1 LDR MDR GP Update
3363
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
368060025 0.45 R-A R-1 LDR MDR GP Update
368060026 0.55 R-A R-1 LDR MDR GP Update
365082021 0.90 ROW R-1 MHDR MDR GP Update
365071002 0.30 R-R R-1 MHDR MDR GP Update
365071003 0.37 R-R R-1 MHDR MDR GP Update
365071004 0.87 R-R R-1 MHDR MDR GP Update
365071005 0.49 R-R R-1 MHDR MDR GP Update
365071006 0.53 R-R R-1 MHDR MDR GP Update
365071008 1.02 R-R R-1 MHDR MDR GP Update
365071009 0.56 R-R R-1 MHDR MDR GP Update
365072001 0.38 R-R R-1 MHDR MDR GP Update
365072002 0.58 R-R R-1 MHDR MDR GP Update
365072003 0.18 R-R R-1 MHDR MDR GP Update
365072004 0.16 R-R R-1 MHDR MDR GP Update
365072005 0.42 R-R R-1 MHDR MDR GP Update
365072006 0.34 R-R R-1 MHDR MDR GP Update
365072007 0.32 R-R R-1 MHDR MDR GP Update
365072011 0.45 R-R R-1 MHDR MDR GP Update
365072012 0.24 R-R R-1 MHDR MDR GP Update
365072014 0.45 R-R R-1 MHDR MDR GP Update
365081001 0.91 R-R R-1 MHDR MDR GP Update
365081002 0.51 R-R R-1 MHDR MDR GP Update
365081003 0.55 R-R R-1 MHDR MDR GP Update
365081004 0.56 R-R R-1 MHDR MDR GP Update
365081008 0.43 R-R R-1 MHDR MDR GP Update
365081009 0.45 R-R R-1 MHDR MDR GP Update
365081010 0.45 R-R R-1 MHDR MDR GP Update
365082002 0.57 R-R R-1 MHDR MDR GP Update
365082003 0.59 R-R R-1 MHDR MDR GP Update
365082004 0.56 R-R R-1 MHDR MDR GP Update
365082005 0.57 R-R R-1 MHDR MDR GP Update
365082006 0.64 R-R R-1 MHDR MDR GP Update
365082008 0.51 R-R R-1 MHDR MDR GP Update
365082009 0.25 R-R R-1 MHDR MDR GP Update
365082010 0.82 R-R R-1 MHDR MDR GP Update
365082020 2.25 R-R R-1 MHDR MDR GP Update
365082022 0.68 R-R R-1 MHDR MDR GP Update
365082025 0.50 R-R R-1 MHDR MDR GP Update
365082027 0.72 R-R R-1 MHDR MDR GP Update
365121002 0.23 R-R R-1 MHDR MDR GP Update
365121003 0.27 R-R R-1 MHDR MDR GP Update
365121004 0.23 R-R R-1 MHDR MDR GP Update
365121005 0.33 R-R R-1 MHDR MDR GP Update
365121008 0.14 R-R R-1 MHDR MDR GP Update
365121009 0.29 R-R R-1 MHDR MDR GP Update
365121019 0.21 R-R R-1 MHDR MDR GP Update
365121020 0.35 R-R R-1 MHDR MDR GP Update
365121023 0.02 R-R R-1 MHDR MDR GP Update
365121025 0.38 R-R R-1 MHDR MDR GP Update
365121026 0.27 R-R R-1 MHDR MDR GP Update
365121027 0.14 R-R R-1 MHDR MDR GP Update
365121028 1.20 R-R R-1 MHDR MDR GP Update
365122001 0.55 R-R R-1 MHDR MDR GP Update
3364
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
365122002 0.33 R-R R-1 MHDR MDR GP Update
365122003 0.18 R-R R-1 MHDR MDR GP Update
365122004 0.18 R-R R-1 MHDR MDR GP Update
365122008 0.79 R-R R-1 MHDR MDR GP Update
365123001 0.39 R-R R-1 MHDR MDR GP Update
365123002 0.16 R-R R-1 MHDR MDR GP Update
365123003 0.05 R-R R-1 MHDR MDR GP Update
365123004 0.23 R-R R-1 MHDR MDR GP Update
365123005 0.40 R-R R-1 MHDR MDR GP Update
365123006 0.15 R-R R-1 MHDR MDR GP Update
365123007 0.17 R-R R-1 MHDR MDR GP Update
365123008 0.15 R-R R-1 MHDR MDR GP Update
365123009 0.14 R-R R-1 MHDR MDR GP Update
365123010 0.13 R-R R-1 MHDR MDR GP Update
365123011 0.15 R-R R-1 MHDR MDR GP Update
365123012 0.15 R-R R-1 MHDR MDR GP Update
365123013 0.15 R-R R-1 MHDR MDR GP Update
365123014 0.19 R-R R-1 MHDR MDR GP Update
365143002 0.15 R-R R-1 MHDR MDR GP Update
365143003 0.17 R-R R-1 MHDR MDR GP Update
365143004 0.17 R-R R-1 MHDR MDR GP Update
365143006 0.16 R-R R-1 MHDR MDR GP Update
365143007 0.15 R-R R-1 MHDR MDR GP Update
365143008 0.16 R-R R-1 MHDR MDR GP Update
365143010 0.15 R-R R-1 MHDR MDR GP Update
365143011 0.15 R-R R-1 MHDR MDR GP Update
365143014 0.24 R-R R-1 MHDR MDR GP Update
365143015 0.14 R-R R-1 MHDR MDR GP Update
365143017 0.16 R-R R-1 MHDR MDR GP Update
365143018 0.15 R-R R-1 MHDR MDR GP Update
365143019 0.19 R-R R-1 MHDR MDR GP Update
365143020 0.53 R-R R-1 MHDR MDR GP Update
365143021 0.33 R-R R-1 MHDR MDR GP Update
365151002 0.33 R-R R-1 MHDR MDR GP Update
365151005 0.15 R-R R-1 MHDR MDR GP Update
365151007 0.22 R-R R-1 MHDR MDR GP Update
365151008 0.26 R-R R-1 MHDR MDR GP Update
365151010 0.15 R-R R-1 MHDR MDR GP Update
365151011 0.30 R-R R-1 MHDR MDR GP Update
365151012 0.15 R-R R-1 MHDR MDR GP Update
365151013 0.15 R-R R-1 MHDR MDR GP Update
365151014 0.15 R-R R-1 MHDR MDR GP Update
365151015 0.15 R-R R-1 MHDR MDR GP Update
365151016 0.15 R-R R-1 MHDR MDR GP Update
365151022 0.32 R-R R-1 MHDR MDR GP Update
365151023 0.15 R-R R-1 MHDR MDR GP Update
365151024 0.15 R-R R-1 MHDR MDR GP Update
365151025 0.17 R-R R-1 MHDR MDR GP Update
365151026 0.17 R-R R-1 MHDR MDR GP Update
365151027 0.17 R-R R-1 MHDR MDR GP Update
365151028 0.17 R-R R-1 MHDR MDR GP Update
365151029 0.21 R-R R-1 MHDR MDR GP Update
365151030 0.51 R-R R-1 MHDR MDR GP Update
3365
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
365151031 0.15 R-R R-1 MHDR MDR GP Update
365151032 0.15 R-R R-1 MHDR MDR GP Update
365152001 0.23 R-R R-1 MHDR MDR GP Update
365152002 0.23 R-R R-1 MHDR MDR GP Update
365152007 0.50 R-R R-1 MHDR MDR GP Update
365152008 0.44 R-R R-1 MHDR MDR GP Update
365152009 0.15 R-R R-1 MHDR MDR GP Update
365152012 0.15 R-R R-1 MHDR MDR GP Update
365152013 0.30 R-R R-1 MHDR MDR GP Update
365153001 0.17 R-R R-1 MHDR MDR GP Update
365153002 0.30 R-R R-1 MHDR MDR GP Update
365153003 0.30 R-R R-1 MHDR MDR GP Update
365153004 0.15 R-R R-1 MHDR MDR GP Update
365153005 0.15 R-R R-1 MHDR MDR GP Update
365153006 0.15 R-R R-1 MHDR MDR GP Update
365153007 0.25 R-R R-1 MHDR MDR GP Update
365153008 0.22 R-R R-1 MHDR MDR GP Update
365153009 0.15 R-R R-1 MHDR MDR GP Update
365153010 0.15 R-R R-1 MHDR MDR GP Update
365153011 0.15 R-R R-1 MHDR MDR GP Update
365153012 0.22 R-R R-1 MHDR MDR GP Update
365153013 0.25 R-R R-1 MHDR MDR GP Update
365153014 0.15 R-R R-1 MHDR MDR GP Update
365153015 0.15 R-R R-1 MHDR MDR GP Update
365153016 0.30 R-R R-1 MHDR MDR GP Update
365153017 0.19 R-R R-1 MHDR MDR GP Update
365153018 0.15 R-R R-1 MHDR MDR GP Update
365161001 0.59 R-R R-1 MHDR MDR GP Update
365161002 0.15 R-R R-1 MHDR MDR GP Update
365161006 0.12 R-R R-1 MHDR MDR GP Update
365161007 0.36 R-R R-1 MHDR MDR GP Update
365161008 0.26 R-R R-1 MHDR MDR GP Update
365161009 0.14 R-R R-1 MHDR MDR GP Update
365161011 0.29 R-R R-1 MHDR MDR GP Update
365161012 0.32 R-R R-1 MHDR MDR GP Update
365161013 1.10 R-R R-1 MHDR MDR GP Update
365161014 0.22 R-R R-1 MHDR MDR GP Update
365161015 0.15 R-R R-1 MHDR MDR GP Update
365161016 0.47 R-R R-1 MHDR MDR GP Update
365170055 0.92 R-R R-1 MHDR MDR GP Update
365170056 0.92 R-R R-1 MHDR MDR GP Update
365170057 0.86 R-R R-1 MHDR MDR GP Update
366022001 0.65 R-R R-1 MHDR MDR GP Update
366022002 0.73 R-R R-1 MHDR MDR GP Update
366022003 0.73 R-R R-1 MHDR MDR GP Update
366022004 0.73 R-R R-1 MHDR MDR GP Update
366022005 0.37 R-R R-1 MHDR MDR GP Update
366022006 0.36 R-R R-1 MHDR MDR GP Update
366022007 0.16 R-R R-1 MHDR MDR GP Update
366022008 1.07 R-R R-1 MHDR MDR GP Update
366022009 0.94 R-R R-1 MHDR MDR GP Update
366022010 0.94 R-R R-1 MHDR MDR GP Update
366023004 0.14 R-R R-1 MHDR MDR GP Update
3366
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
366023006 0.22 R-R R-1 MHDR MDR GP Update
366024001 0.25 R-R R-1 MHDR MDR GP Update
366024002 0.25 R-R R-1 MHDR MDR GP Update
366024003 0.25 R-R R-1 MHDR MDR GP Update
366024004 0.25 R-R R-1 MHDR MDR GP Update
366024005 0.25 R-R R-1 MHDR MDR GP Update
366024006 0.26 R-R R-1 MHDR MDR GP Update
366024007 0.26 R-R R-1 MHDR MDR GP Update
366024008 0.26 R-R R-1 MHDR MDR GP Update
366024011 1.44 R-R R-1 MHDR MDR GP Update
366024013 0.25 R-R R-1 MHDR MDR GP Update
366024014 0.24 R-R R-1 MHDR MDR GP Update
366024015 0.25 R-R R-1 MHDR MDR GP Update
366024016 0.23 R-R R-1 MHDR MDR GP Update
366032001 0.37 R-R R-1 MHDR MDR GP Update
366032002 0.21 R-R R-1 MHDR MDR GP Update
366032003 0.21 R-R R-1 MHDR MDR GP Update
366032005 0.19 R-R R-1 MHDR MDR GP Update
366032006 0.19 R-R R-1 MHDR MDR GP Update
366032007 0.18 R-R R-1 MHDR MDR GP Update
366032008 0.18 R-R R-1 MHDR MDR GP Update
366032009 0.19 R-R R-1 MHDR MDR GP Update
366032010 0.19 R-R R-1 MHDR MDR GP Update
366032011 0.18 R-R R-1 MHDR MDR GP Update
366032012 0.18 R-R R-1 MHDR MDR GP Update
366033003 0.65 R-R R-1 MHDR MDR GP Update
366033004 0.62 R-R R-1 MHDR MDR GP Update
366033005 0.21 R-R R-1 MHDR MDR GP Update
366033006 0.21 R-R R-1 MHDR MDR GP Update
366033007 0.21 R-R R-1 MHDR MDR GP Update
366033008 0.68 R-R R-1 MHDR MDR GP Update
366041001 0.22 R-R R-1 MHDR MDR GP Update
366041002 0.22 R-R R-1 MHDR MDR GP Update
366041003 0.22 R-R R-1 MHDR MDR GP Update
366041004 0.22 R-R R-1 MHDR MDR GP Update
366041005 0.22 R-R R-1 MHDR MDR GP Update
366041006 0.26 R-R R-1 MHDR MDR GP Update
366041007 0.08 R-R R-1 MHDR MDR GP Update
366041010 0.05 R-R R-1 MHDR MDR GP Update
366041011 0.21 R-R R-1 MHDR MDR GP Update
366041012 0.21 R-R R-1 MHDR MDR GP Update
366041013 0.21 R-R R-1 MHDR MDR GP Update
366041014 0.07 R-R R-1 MHDR MDR GP Update
366041015 0.25 R-R R-1 MHDR MDR GP Update
366041016 0.62 R-R R-1 MHDR MDR GP Update
366041018 0.20 R-R R-1 MHDR MDR GP Update
366041019 0.21 R-R R-1 MHDR MDR GP Update
366041020 0.26 R-R R-1 MHDR MDR GP Update
366041021 0.24 R-R R-1 MHDR MDR GP Update
366041022 0.19 R-R R-1 MHDR MDR GP Update
366041047 0.29 R-R R-1 MHDR MDR GP Update
380170002 0.98 R-R R-1 MHDR MDR GP Update
380170006 0.72 R-R R-1 MHDR MDR GP Update
3367
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
380170009 0.72 R-R R-1 MHDR MDR GP Update
380170010 0.67 R-R R-1 MHDR MDR GP Update
380170013 1.07 R-R R-1 MHDR MDR GP Update
380170017 2.00 R-R R-1 VLDR MDR GP Update
380170021 4.02 R-R R-1 VLDR MDR GP Update
380170022 0.53 R-R R-1 VLDR MDR GP Update
380170023 8.97 R-R R-1 VLDR MDR GP Update
380170025 4.28 R-R R-1 VLDR MDR GP Update
380170031 6.02 R-R R-1 VLDR MDR GP Update
380170038 0.87 R-R R-1 VLDR MDR GP Update
380170043 2.76 R-R R-1 VLDR MDR GP Update
380170044 2.33 R-R R-1 MHDR MDR GP Update
380170046 1.78 R-R R-1 VLDR MDR GP Update
380170048 2.32 R-R R-1 MHDR MDR GP Update
380170049 3.52 R-R R-1 MHDR MDR GP Update
380210001 1.67 R-R R-1 VLDR MDR GP Update
380210002 4.20 R-R R-1 VLDR MDR GP Update
365061022 0.46 R-3 R-2 VHDR MHDR GP Update
365051015 0.17 R-R R-2 VHDR MHDR GP Update
365051016 0.17 R-R R-2 VHDR MHDR GP Update
365051017 0.17 R-R R-2 VHDR MHDR GP Update
365051018 0.17 R-R R-2 VHDR MHDR GP Update
365051019 0.17 R-R R-2 VHDR MHDR GP Update
365051022 0.20 R-R R-2 VHDR MHDR GP Update
365051023 0.17 R-R R-2 VHDR MHDR GP Update
365051027 0.34 R-R R-2 VHDR MHDR GP Update
365052001 0.17 R-R R-2 VHDR MHDR GP Update
365052002 0.17 R-R R-2 VHDR MHDR GP Update
365052004 0.17 R-R R-2 VHDR MHDR GP Update
365052005 0.34 R-R R-2 VHDR MHDR GP Update
365052007 0.26 R-R R-2 VHDR MHDR GP Update
365052008 0.34 R-R R-2 VHDR MHDR GP Update
365052009 0.26 R-R R-2 VHDR MHDR GP Update
365052010 0.19 R-R R-2 VHDR MHDR GP Update
365052012 0.35 R-R R-2 VHDR MHDR GP Update
365052013 0.17 R-R R-2 VHDR MHDR GP Update
365052014 0.34 R-R R-2 VHDR MHDR GP Update
365052015 0.17 R-R R-2 VHDR MHDR GP Update
365052016 0.17 R-R R-2 VHDR MHDR GP Update
365052017 0.17 R-R R-2 VHDR MHDR GP Update
365052018 0.17 R-R R-2 VHDR MHDR GP Update
365052019 0.16 R-R R-2 VHDR MHDR GP Update
365052020 0.17 R-R R-2 VHDR MHDR GP Update
365052021 0.17 R-R R-2 VHDR MHDR GP Update
365052022 0.17 R-R R-2 VHDR MHDR GP Update
365052023 0.17 R-R R-2 VHDR MHDR GP Update
365052024 0.17 R-R R-2 VHDR MHDR GP Update
365053002 0.17 R-R R-2 VHDR MHDR GP Update
365053003 0.17 R-R R-2 VHDR MHDR GP Update
365053004 0.34 R-R R-2 VHDR MHDR GP Update
365053005 0.34 R-R R-2 VHDR MHDR GP Update
365053006 0.17 R-R R-2 VHDR MHDR GP Update
365053007 0.17 R-R R-2 VHDR MHDR GP Update
3368
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
365053010 0.16 R-R R-2 VHDR MHDR GP Update
365053011 0.16 R-R R-2 VHDR MHDR GP Update
365053012 0.16 R-R R-2 VHDR MHDR GP Update
365053013 0.16 R-R R-2 VHDR MHDR GP Update
365053014 0.15 R-R R-2 VHDR MHDR GP Update
365053015 0.15 R-R R-2 VHDR MHDR GP Update
365053016 0.15 R-R R-2 VHDR MHDR GP Update
365053017 0.15 R-R R-2 VHDR MHDR GP Update
365053018 0.15 R-R R-2 VHDR MHDR GP Update
365053019 0.31 R-R R-2 VHDR MHDR GP Update
365053020 0.37 R-R R-2 VHDR MHDR GP Update
365053021 0.17 R-R R-2 VHDR MHDR GP Update
365053022 0.18 R-R R-2 VHDR MHDR GP Update
365053023 0.18 R-R R-2 VHDR MHDR GP Update
365053024 0.34 R-R R-2 VHDR MHDR GP Update
365061004 0.10 R-R R-2 VHDR MHDR GP Update
365061005 0.15 R-R R-2 VHDR MHDR GP Update
365061006 0.15 R-R R-2 VHDR MHDR GP Update
365061007 0.15 R-R R-2 VHDR MHDR GP Update
365061008 0.31 R-R R-2 VHDR MHDR GP Update
365061009 0.15 R-R R-2 VHDR MHDR GP Update
365061010 0.22 R-R R-2 VHDR MHDR GP Update
365061011 0.09 R-R R-2 VHDR MHDR GP Update
365061012 0.15 R-R R-2 VHDR MHDR GP Update
365061013 0.15 R-R R-2 VHDR MHDR GP Update
365061014 0.06 R-R R-2 VHDR MHDR GP Update
365061015 0.40 R-R R-2 VHDR MHDR GP Update
365061016 0.31 R-R R-2 VHDR MHDR GP Update
365061019 0.51 R-R R-2 VHDR MHDR GP Update
365061020 0.94 R-R R-2 VHDR MHDR GP Update
365061021 0.49 R-R R-2 VHDR MHDR GP Update
365061023 0.53 R-R R-2 VHDR MHDR GP Update
365061024 0.50 R-R R-2 VHDR MHDR GP Update
365061025 0.50 R-R R-2 VHDR MHDR GP Update
365061026 0.50 R-R R-2 VHDR MHDR GP Update
365061027 0.50 R-R R-2 VHDR MHDR GP Update
365061032 0.16 R-R R-2 VHDR MHDR GP Update
365061033 0.19 R-R R-2 VHDR MHDR GP Update
365062001 0.22 R-R R-2 VHDR MHDR GP Update
365062002 0.24 R-R R-2 VHDR MHDR GP Update
365062003 0.54 R-R R-2 VHDR MHDR GP Update
365062004 0.36 R-R R-2 VHDR MHDR GP Update
365062005 0.45 R-R R-2 VHDR MHDR GP Update
365062006 0.45 R-R R-2 VHDR MHDR GP Update
365062007 0.47 R-R R-2 VHDR MHDR GP Update
365062008 0.43 R-R R-2 VHDR MHDR GP Update
365062009 0.47 R-R R-2 VHDR MHDR GP Update
365062010 0.47 R-R R-2 VHDR MHDR GP Update
365062013 0.18 R-R R-2 VHDR MHDR GP Update
365062014 0.27 R-R R-2 VHDR MHDR GP Update
365062015 0.44 R-R R-2 VHDR MHDR GP Update
365062017 0.42 R-R R-2 VHDR MHDR GP Update
365062019 0.49 R-R R-2 VHDR MHDR GP Update
3369
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
365062020 0.42 R-R R-2 VHDR MHDR GP Update
365091001 0.28 R-R R-2 VHDR MHDR GP Update
365091002 0.15 R-R R-2 VHDR MHDR GP Update
365091004 0.14 R-R R-2 VHDR MHDR GP Update
365091005 0.15 R-R R-2 VHDR MHDR GP Update
365091006 0.22 R-R R-2 VHDR MHDR GP Update
365091007 0.22 R-R R-2 VHDR MHDR GP Update
365091008 0.21 R-R R-2 VHDR MHDR GP Update
365091009 0.19 R-R R-2 VHDR MHDR GP Update
365091010 0.19 R-R R-2 VHDR MHDR GP Update
365091011 0.18 R-R R-2 VHDR MHDR GP Update
365091012 0.25 R-R R-2 VHDR MHDR GP Update
365091013 0.27 R-R R-2 VHDR MHDR GP Update
365091014 0.21 R-R R-2 VHDR MHDR GP Update
365091015 0.17 R-R R-2 VHDR MHDR GP Update
365091016 0.20 R-R R-2 VHDR MHDR GP Update
365091017 0.14 R-R R-2 VHDR MHDR GP Update
365091018 0.23 R-R R-2 VHDR MHDR GP Update
365091019 0.16 R-R R-2 VHDR MHDR GP Update
365091020 0.16 R-R R-2 VHDR MHDR GP Update
365092001 0.20 R-R R-2 VHDR MHDR GP Update
365092002 0.15 R-R R-2 VHDR MHDR GP Update
365092003 0.15 R-R R-2 VHDR MHDR GP Update
365092004 0.15 R-R R-2 VHDR MHDR GP Update
365092005 0.15 R-R R-2 VHDR MHDR GP Update
365092006 0.15 R-R R-2 VHDR MHDR GP Update
365092007 0.15 R-R R-2 VHDR MHDR GP Update
365092008 0.15 R-R R-2 VHDR MHDR GP Update
365092009 0.15 R-R R-2 VHDR MHDR GP Update
365092010 0.15 R-R R-2 VHDR MHDR GP Update
365092011 0.23 R-R R-2 VHDR MHDR GP Update
365092014 0.15 R-R R-2 VHDR MHDR GP Update
365092015 0.14 R-R R-2 VHDR MHDR GP Update
365092016 0.15 R-R R-2 VHDR MHDR GP Update
365092017 0.15 R-R R-2 VHDR MHDR GP Update
365092018 0.19 R-R R-2 VHDR MHDR GP Update
365092020 0.15 R-R R-2 VHDR MHDR GP Update
365092021 0.15 R-R R-2 VHDR MHDR GP Update
365092022 0.15 R-R R-2 VHDR MHDR GP Update
365092023 0.26 R-R R-2 VHDR MHDR GP Update
365092024 0.15 R-R R-2 VHDR MHDR GP Update
365092028 0.15 R-R R-2 VHDR MHDR GP Update
365092029 0.15 R-R R-2 VHDR MHDR GP Update
365092030 0.14 R-R R-2 VHDR MHDR GP Update
365092031 0.15 R-R R-2 VHDR MHDR GP Update
365092032 0.27 R-R R-2 VHDR MHDR GP Update
365092033 0.19 R-R R-2 VHDR MHDR GP Update
365092034 0.38 R-R R-2 VHDR MHDR GP Update
365093002 0.15 R-R R-2 VHDR MHDR GP Update
365093003 0.14 R-R R-2 VHDR MHDR GP Update
365093004 0.15 R-R R-2 VHDR MHDR GP Update
365093005 0.15 R-R R-2 VHDR MHDR GP Update
365093006 0.15 R-R R-2 VHDR MHDR GP Update
3370
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
365093007 0.15 R-R R-2 VHDR MHDR GP Update
365101001 0.48 R-R R-2 VHDR MHDR GP Update
365101002 0.35 R-R R-2 VHDR MHDR GP Update
365101003 0.17 R-R R-2 VHDR MHDR GP Update
365101004 0.16 R-R R-2 VHDR MHDR GP Update
365101005 0.50 R-R R-2 VHDR MHDR GP Update
365101006 0.16 R-R R-2 VHDR MHDR GP Update
365101007 0.16 R-R R-2 VHDR MHDR GP Update
365101010 0.21 R-R R-2 VHDR MHDR GP Update
365101011 0.14 R-R R-2 VHDR MHDR GP Update
365101012 0.15 R-R R-2 VHDR MHDR GP Update
365101013 0.15 R-R R-2 VHDR MHDR GP Update
365101014 0.25 R-R R-2 VHDR MHDR GP Update
365101015 0.24 R-R R-2 VHDR MHDR GP Update
365101018 0.18 R-R R-2 VHDR MHDR GP Update
365101019 0.45 R-R R-2 VHDR MHDR GP Update
365101020 0.13 R-R R-2 VHDR MHDR GP Update
365101021 0.14 R-R R-2 VHDR MHDR GP Update
365101022 0.03 R-R R-2 VHDR MHDR GP Update
365101023 0.35 R-R R-2 VHDR MHDR GP Update
365102001 0.15 R-R R-2 VHDR MHDR GP Update
365102002 0.15 R-R R-2 VHDR MHDR GP Update
365102003 0.15 R-R R-2 VHDR MHDR GP Update
365102004 0.14 R-R R-2 VHDR MHDR GP Update
365102005 0.15 R-R R-2 VHDR MHDR GP Update
365102006 0.15 R-R R-2 VHDR MHDR GP Update
365102007 0.15 R-R R-2 VHDR MHDR GP Update
365102009 0.16 R-R R-2 VHDR MHDR GP Update
365102010 0.16 R-R R-2 VHDR MHDR GP Update
365102011 0.16 R-R R-2 VHDR MHDR GP Update
365102012 0.17 R-R R-2 VHDR MHDR GP Update
365102013 0.16 R-R R-2 VHDR MHDR GP Update
365102014 0.15 R-R R-2 VHDR MHDR GP Update
365102015 0.30 R-R R-2 VHDR MHDR GP Update
365102016 0.29 R-R R-2 VHDR MHDR GP Update
365102017 0.15 R-R R-2 VHDR MHDR GP Update
365102018 0.15 R-R R-2 VHDR MHDR GP Update
365102019 0.15 R-R R-2 VHDR MHDR GP Update
365102020 0.15 R-R R-2 VHDR MHDR GP Update
365102021 0.14 R-R R-2 VHDR MHDR GP Update
365102022 0.17 R-R R-2 VHDR MHDR GP Update
365102023 0.21 R-R R-2 VHDR MHDR GP Update
365103001 0.15 R-R R-2 VHDR MHDR GP Update
365103002 0.15 R-R R-2 VHDR MHDR GP Update
365103003 0.15 R-R R-2 VHDR MHDR GP Update
365103004 0.15 R-R R-2 VHDR MHDR GP Update
365103005 0.15 R-R R-2 VHDR MHDR GP Update
365103006 0.15 R-R R-2 VHDR MHDR GP Update
365103007 0.15 R-R R-2 VHDR MHDR GP Update
365103008 0.14 R-R R-2 VHDR MHDR GP Update
365103009 0.15 R-R R-2 VHDR MHDR GP Update
365103010 0.14 R-R R-2 VHDR MHDR GP Update
365103011 0.15 R-R R-2 VHDR MHDR GP Update
3371
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
365103012 0.14 R-R R-2 VHDR MHDR GP Update
365103013 0.13 R-R R-2 VHDR MHDR GP Update
365103014 0.12 R-R R-2 VHDR MHDR GP Update
365111001 0.14 R-R R-2 VHDR MHDR GP Update
365111002 0.29 R-R R-2 VHDR MHDR GP Update
365111003 0.15 R-R R-2 VHDR MHDR GP Update
365111004 0.14 R-R R-2 VHDR MHDR GP Update
365111005 0.14 R-R R-2 VHDR MHDR GP Update
365111006 0.16 R-R R-2 VHDR MHDR GP Update
365111007 0.16 R-R R-2 VHDR MHDR GP Update
365111008 0.15 R-R R-2 VHDR MHDR GP Update
365112001 0.18 R-R R-2 VHDR MHDR GP Update
365112002 0.16 R-R R-2 VHDR MHDR GP Update
365112003 0.16 R-R R-2 VHDR MHDR GP Update
365112004 0.17 R-R R-2 VHDR MHDR GP Update
365112005 0.19 R-R R-2 VHDR MHDR GP Update
365112010 0.15 R-R R-2 VHDR MHDR GP Update
365112011 0.16 R-R R-2 VHDR MHDR GP Update
365112012 0.16 R-R R-2 VHDR MHDR GP Update
365112013 0.16 R-R R-2 VHDR MHDR GP Update
365112014 0.16 R-R R-2 VHDR MHDR GP Update
365112015 0.17 R-R R-2 VHDR MHDR GP Update
365112016 0.15 R-R R-2 VHDR MHDR GP Update
365112017 0.15 R-R R-2 VHDR MHDR GP Update
365112018 0.15 R-R R-2 VHDR MHDR GP Update
365112019 0.30 R-R R-2 VHDR MHDR GP Update
365112020 0.16 R-R R-2 VHDR MHDR GP Update
365112021 0.15 R-R R-2 VHDR MHDR GP Update
365112022 0.15 R-R R-2 VHDR MHDR GP Update
365112025 0.15 R-R R-2 VHDR MHDR GP Update
365113001 0.17 R-R R-2 VHDR MHDR GP Update
365113002 0.15 R-R R-2 VHDR MHDR GP Update
365113003 0.15 R-R R-2 VHDR MHDR GP Update
365113009 0.34 R-R R-2 VHDR MHDR GP Update
365113010 0.17 R-R R-2 VHDR MHDR GP Update
365113011 0.16 R-R R-2 VHDR MHDR GP Update
365113012 0.18 R-R R-2 VHDR MHDR GP Update
365113015 0.32 R-R R-2 VHDR MHDR GP Update
365113017 0.35 R-R R-2 VHDR MHDR GP Update
365113018 0.17 R-R R-2 VHDR MHDR GP Update
365113019 0.19 R-R R-2 VHDR MHDR GP Update
365113020 0.20 R-R R-2 VHDR MHDR GP Update
365113021 0.18 R-R R-2 VHDR MHDR GP Update
365113022 0.17 R-R R-2 VHDR MHDR GP Update
365113027 0.45 R-R R-2 VHDR MHDR GP Update
365113028 0.28 R-R R-2 VHDR MHDR GP Update
365113029 0.29 R-R R-2 VHDR MHDR GP Update
365113030 0.13 R-R R-2 VHDR MHDR GP Update
365113035 0.26 R-R R-2 VHDR MHDR GP Update
365113036 0.15 R-R R-2 VHDR MHDR GP Update
365131001 0.30 R-R R-2 VHDR MHDR GP Update
365131010 0.13 R-R R-2 VHDR MHDR GP Update
365131014 0.17 R-R R-2 VHDR MHDR GP Update
3372
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
365132001 0.43 R-R R-2 VHDR MHDR GP Update
365132002 0.15 R-R R-2 VHDR MHDR GP Update
365132003 0.15 R-R R-2 VHDR MHDR GP Update
365132004 0.15 R-R R-2 VHDR MHDR GP Update
365132005 0.15 R-R R-2 VHDR MHDR GP Update
365132006 0.15 R-R R-2 VHDR MHDR GP Update
365132007 0.15 R-R R-2 VHDR MHDR GP Update
365132008 0.15 R-R R-2 VHDR MHDR GP Update
365132009 0.15 R-R R-2 VHDR MHDR GP Update
365132010 0.15 R-R R-2 VHDR MHDR GP Update
365132011 0.15 R-R R-2 VHDR MHDR GP Update
365132015 0.30 R-R R-2 VHDR MHDR GP Update
365132016 0.15 R-R R-2 VHDR MHDR GP Update
365132017 0.15 R-R R-2 VHDR MHDR GP Update
365132018 0.15 R-R R-2 VHDR MHDR GP Update
365132019 0.15 R-R R-2 VHDR MHDR GP Update
365132020 0.15 R-R R-2 VHDR MHDR GP Update
365132021 0.15 R-R R-2 VHDR MHDR GP Update
365132022 0.15 R-R R-2 VHDR MHDR GP Update
365132027 0.15 R-R R-2 VHDR MHDR GP Update
365132028 0.15 R-R R-2 VHDR MHDR GP Update
365132032 0.15 R-R R-2 VHDR MHDR GP Update
365132033 0.15 R-R R-2 VHDR MHDR GP Update
365132034 0.16 R-R R-2 VHDR MHDR GP Update
365132035 0.16 R-R R-2 VHDR MHDR GP Update
365132038 0.18 R-R R-2 VHDR MHDR GP Update
365132039 0.32 R-R R-2 VHDR MHDR GP Update
365132040 0.30 R-R R-2 VHDR MHDR GP Update
365132041 0.15 R-R R-2 VHDR MHDR GP Update
365132042 0.15 R-R R-2 VHDR MHDR GP Update
365141003 0.15 R-R R-2 VHDR MHDR GP Update
365141007 0.15 R-R R-2 VHDR MHDR GP Update
365141008 0.15 R-R R-2 VHDR MHDR GP Update
365141009 0.15 R-R R-2 VHDR MHDR GP Update
365141010 0.15 R-R R-2 VHDR MHDR GP Update
365141011 0.18 R-R R-2 VHDR MHDR GP Update
365141013 0.16 R-R R-2 VHDR MHDR GP Update
365141014 0.15 R-R R-2 VHDR MHDR GP Update
365141015 0.17 R-R R-2 VHDR MHDR GP Update
365141016 0.16 R-R R-2 VHDR MHDR GP Update
365141017 0.15 R-R R-2 VHDR MHDR GP Update
365141018 0.15 R-R R-2 VHDR MHDR GP Update
365141019 0.15 R-R R-2 VHDR MHDR GP Update
365141020 0.15 R-R R-2 VHDR MHDR GP Update
365141021 0.15 R-R R-2 VHDR MHDR GP Update
365141022 0.15 R-R R-2 VHDR MHDR GP Update
365141023 0.15 R-R R-2 VHDR MHDR GP Update
365141025 0.20 R-R R-2 VHDR MHDR GP Update
365141028 0.15 R-R R-2 VHDR MHDR GP Update
365141029 0.15 R-R R-2 VHDR MHDR GP Update
365141030 0.15 R-R R-2 VHDR MHDR GP Update
365141031 0.15 R-R R-2 VHDR MHDR GP Update
365141032 0.20 R-R R-2 VHDR MHDR GP Update
3373
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
365141034 0.14 R-R R-2 VHDR MHDR GP Update
365141035 0.19 R-R R-2 VHDR MHDR GP Update
365141036 0.18 R-R R-2 VHDR MHDR GP Update
365141037 0.16 R-R R-2 VHDR MHDR GP Update
365141038 0.16 R-R R-2 VHDR MHDR GP Update
365141039 0.15 R-R R-2 VHDR MHDR GP Update
365141040 0.15 R-R R-2 VHDR MHDR GP Update
365141041 0.15 R-R R-2 VHDR MHDR GP Update
365141042 0.15 R-R R-2 VHDR MHDR GP Update
365141043 0.15 R-R R-2 VHDR MHDR GP Update
365141044 0.15 R-R R-2 VHDR MHDR GP Update
365141045 0.15 R-R R-2 VHDR MHDR GP Update
365142005 0.50 R-R R-2 VHDR MHDR GP Update
365142006 0.15 R-R R-2 VHDR MHDR GP Update
365142007 0.15 R-R R-2 VHDR MHDR GP Update
365142008 0.17 R-R R-2 VHDR MHDR GP Update
365142009 0.16 R-R R-2 VHDR MHDR GP Update
365142010 0.15 R-R R-2 VHDR MHDR GP Update
365142016 0.21 R-R R-2 VHDR MHDR GP Update
365142017 0.19 R-R R-2 VHDR MHDR GP Update
365142018 0.15 R-R R-2 VHDR MHDR GP Update
365142019 0.15 R-R R-2 VHDR MHDR GP Update
365142020 0.15 R-R R-2 VHDR MHDR GP Update
365142021 0.15 R-R R-2 VHDR MHDR GP Update
365142022 0.15 R-R R-2 VHDR MHDR GP Update
365142024 0.15 R-R R-2 VHDR MHDR GP Update
365142025 0.15 R-R R-2 VHDR MHDR GP Update
365142026 0.15 R-R R-2 VHDR MHDR GP Update
365142027 0.15 R-R R-2 VHDR MHDR GP Update
365142028 0.15 R-R R-2 VHDR MHDR GP Update
365142029 0.15 R-R R-2 VHDR MHDR GP Update
365142030 0.15 R-R R-2 VHDR MHDR GP Update
365142031 0.15 R-R R-2 VHDR MHDR GP Update
365142032 0.15 R-R R-2 VHDR MHDR GP Update
365142033 0.15 R-R R-2 VHDR MHDR GP Update
365142034 0.15 R-R R-2 VHDR MHDR GP Update
365142035 0.15 R-R R-2 VHDR MHDR GP Update
376180006 1.41 C-P-S R-3 MUPA VHDR GP Update
376190002 6.78 C-P-S R-3 MUPA VHDR GP Update
367210021 0.21 R-R R-4 MUPA HHDR GP Update
367210027 0.22 R-R R-4 MUPA HHDR GP Update
367210029 5.36 R-R R-4 MUPA HHDR GP Update
367210033 0.47 R-R R-4 MUPA HHDR GP Update
367210042 3.48 R-R R-4 MUPA HHDR GP Update
365220027 10.44 R-R R-A RR LLR GP Update
366250001 40.16 R-R R-A RR LLR GP Update
366310023 8.63 R-R R-A RR LLR GP Update
366320006 20.77 R-R R-A RR LLR GP Update
366320019 8.87 R-R R-A RR LLR GP Update
366320020 8.34 R-R R-A RR LLR GP Update
366320021 7.42 R-R R-A RR LLR GP Update
366320041 2.54 R-R R-A RR LLR GP Update
366320043 4.83 R-R R-A RR LLR GP Update
3374
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
366320046 3.41 R-R R-A RR LLR GP Update
366320047 1.56 R-R R-A RR LLR GP Update
366320050 6.83 R-R R-A RR LLR GP Update
361030007 0.55 R-A-1 R-M RM RM GP Update
361021035 4.33 R-A-5 R-M RM RM GP Update
361021013 4.77 R-A-1 R-M RR VLDR GP Update
380250021 0.08 C-P-S ROW FWY FWY GP Update
366190002 0.14 R-R ROW FWY FWY GP Update
366200011 0.16 R-R ROW FWY FWY GP Update
366200012 0.24 R-R ROW FWY FWY GP Update
366280025 2.10 R-R ROW FWY FWY GP Update
376190003 1.46 R-R ROW FWY FWY GP Update
365220001 2.26 R-1 R-R RR EDR GP Update
365220002 2.16 R-1 R-R RR EDR GP Update
365220003 2.20 R-1 R-R RR EDR GP Update
365220004 2.45 R-1 R-R RR EDR GP Update
365220005 1.88 R-1 R-R RR EDR GP Update
365220006 2.57 R-1 R-R RM EDR GP Update
365220007 2.40 R-1 R-R RM EDR GP Update
365220008 2.25 R-1 R-R RR EDR GP Update
365220009 2.95 R-1 R-R RR EDR GP Update
365220010 2.32 R-1 R-R RR EDR GP Update
365220011 2.45 R-1 R-R RR EDR GP Update
365220012 2.12 R-1 R-R RR EDR GP Update
365220014 2.48 R-1 R-R RM EDR GP Update
365220015 2.74 R-1 R-R RR EDR GP Update
365220016 2.79 R-1 R-R RR EDR GP Update
365220017 2.44 R-1 R-R RR EDR GP Update
365220018 2.46 R-1 R-R RR EDR GP Update
365220019 2.52 R-1 R-R RR EDR GP Update
365220020 2.46 R-1 R-R RR EDR GP Update
365220021 2.39 R-1 R-R RR EDR GP Update
365220022 2.24 R-1 R-R RR EDR GP Update
365220023 2.37 R-1 R-R RR EDR GP Update
365220024 2.21 R-1 R-R RR EDR GP Update
365220025 2.21 R-1 R-R RR EDR GP Update
365240001 2.25 R-1 R-R RR EDR GP Update
365240002 2.33 R-1 R-R RM EDR GP Update
365240003 2.16 R-1 R-R RM EDR GP Update
365240004 2.29 R-1 R-R RR EDR GP Update
380150001 6.82 R-A-1/2 R-R LDR EDR GP Update
365250062 5.20 R-A-5 R-R RR EDR GP Update
365250063 4.06 R-A-5 R-R RR EDR GP Update
367130043 0.01 R-R C-G CR CO WDC Consistency
362080021 7.49 R-4 C-G CR CR WDC Consistency
366210035 2.32 R-R C-G BP CR WDC Consistency
366210036 2.36 R-R C-G BP CR WDC Consistency
366210037 2.20 R-R C-G BP CR WDC Consistency
367100013 0.22 R-R C-G CR CR WDC Consistency
367100014 0.24 R-R C-G CR CR WDC Consistency
367100015 0.24 R-R C-G CR CR WDC Consistency
367100016 0.24 R-R C-G CR CR WDC Consistency
367130018 0.01 R-R C-G CR CR WDC Consistency
3375
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
367420048 0.20 R-R C-G CR CR WDC Consistency
380120007 1.51 R-R C-G CR CR WDC Consistency
380120008 1.15 R-R C-G CR CR WDC Consistency
380120026 0.95 R-R C-G CR CR WDC Consistency
380120027 0.87 R-R C-G CR CR WDC Consistency
380120028 0.97 R-R C-G CR CR WDC Consistency
367180040 5.78 C-P-S C-H CR CR WDC Consistency
367180042 2.90 C-P-S C-H CR CR WDC Consistency
367180044 1.46 C-P-S C-H CR CR WDC Consistency
367180045 4.65 C-P-S C-H CR CR WDC Consistency
367180049 1.36 C-P-S C-H CR CR WDC Consistency
367181015 0.80 C-P-S C-H CR CR WDC Consistency
367181020 1.97 C-P-S C-H CR CR WDC Consistency
367300002 3.50 C-P-S C-H CR CR WDC Consistency
367300003 4.05 C-P-S C-H CR CR WDC Consistency
380250009 3.08 I-P M-C LI LI WDC Consistency
380250026 3.69 I-P M-C LI LI WDC Consistency
380250027 9.87 I-P M-C LI LI WDC Consistency
380250040 1.66 I-P M-C LI LI WDC Consistency
367140012 0.30 C-O M-I BP BP WDC Consistency
370090003 9.41 R-R M-I LI LI WDC Consistency
370090031 19.08 R-R M-I LI LI WDC Consistency
370340022 0.60 R-R M-I LI LI WDC Consistency
370340023 0.60 R-R M-I LI LI WDC Consistency
362250027 4.91 C-P-S MUH MUPA MUH WDC Consistency
362250028 2.51 R-R MUH MUPA MUH WDC Consistency
362250030 4.10 R-R MUH MUPA MUH WDC Consistency
362250031 3.51 R-R MUH MUPA MUH WDC Consistency
367050065 9.56 R-R MUH MUPA MUH WDC Consistency
362100058 5.38 R-5 O-S OS-R OS-R WDC Consistency
362100059 3.67 R-5 O-S OS-R OS-R WDC Consistency
362100060 0.17 R-5 O-S OS-R OS-R WDC Consistency
362100062 14.51 R-5 O-S OS-R OS-R WDC Consistency
362100064 15.55 R-5 O-S OS-R OS-R WDC Consistency
362100065 1.30 R-5 O-S OS-R OS-R WDC Consistency
362100066 0.22 R-5 O-S OS-R OS-R WDC Consistency
362140017 1.12 R-5 O-S OS-R OS-R WDC Consistency
362140020 12.10 R-5 O-S OS-R OS-R WDC Consistency
362140045 64.14 R-5 O-S OS-R OS-R WDC Consistency
362140047 4.88 R-5 O-S OS-R OS-R WDC Consistency
362201017 1.85 R-5 O-S OS-R OS-R WDC Consistency
362201019 1.01 R-5 O-S OS-R OS-R WDC Consistency
362201020 0.14 R-5 O-S OS-R OS-R WDC Consistency
362212019 1.17 R-5 O-S OS-R OS-R WDC Consistency
362221018 3.18 R-5 O-S OS-R OS-R WDC Consistency
362301017 23.80 R-5 O-S OS-R OS-R WDC Consistency
362302011 20.49 R-5 O-S OS-R OS-R WDC Consistency
362311025 1.71 R-5 O-S OS-R OS-R WDC Consistency
362311026 0.96 R-5 O-S OS-R OS-R WDC Consistency
362321028 3.61 R-5 O-S OS-R OS-R WDC Consistency
362491013 1.77 R-5 O-S OS-R OS-R WDC Consistency
362150025 2.23 R-R O-S OS-R OS-R WDC Consistency
362150026 77.17 R-R O-S OS-R OS-R WDC Consistency
3376
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
362140019 0.63 ST O-S OS-R OS-R WDC Consistency
365210046 1.44 R-R O-S OS-CH OS-CH WDC Consistency
365210047 1.13 R-R O-S OS-CH OS-CH WDC Consistency
365270071 0.14 R-R O-S OS-CH OS-CH WDC Consistency
380250036 15.14 SP ZONE O-S OS-CH OS-CH WDC Consistency 376180010 7.75 C-1/C-P P-F PF PF WDC Consistency
366300077 0.30 R-R P-F PF PF WDC Consistency
366300084 80.20 R-R P-F PF PF WDC Consistency
367030007 3.18 R-R P-F PF PF WDC Consistency
367030008 4.53 R-R P-F PF PF WDC Consistency
367030010 6.55 R-R P-F PF PF WDC Consistency
367030011 9.35 R-R P-F PF PF WDC Consistency
367030013 6.52 R-R P-F PF PF WDC Consistency
367030014 9.31 R-R P-F PF PF WDC Consistency
367030026 2.49 R-R P-F PF PF WDC Consistency
367030030 1.27 R-R P-F PF PF WDC Consistency
367030036 0.65 R-R P-F PF PF WDC Consistency
367030037 1.01 R-R P-F PF PF WDC Consistency
367030038 0.70 R-R P-F PF PF WDC Consistency
367030039 0.10 R-R P-F PF PF WDC Consistency
370090020 1.28 R-R P-F PF PF WDC Consistency
376350020 8.85 R-R P-F PF PF WDC Consistency
380150021 2.38 R-R P-F PF PF WDC Consistency
380150022 1.23 R-R P-F PF PF WDC Consistency
380150023 0.01 R-R P-F PF PF WDC Consistency
380150024 0.15 R-R P-F PF PF WDC Consistency
368030043 1.40 C-1/C-P R-1 MDR MDR WDC Consistency
368030057 3.06 C-1/C-P R-1 MDR MDR WDC Consistency
380050013 2.29 R-1-20000 R-1 MDR MDR WDC Consistency
367250017 29.14 R-3 R-1 MDR MDR WDC Consistency
362070013 8.85 R-4 R-1 MHDR MDR WDC Consistency
362080008 5.10 R-4 R-1 MHDR MDR WDC Consistency
362080009 2.65 R-4 R-1 MHDR MDR WDC Consistency
362090009 1.29 R-4 R-1 MHDR MDR WDC Consistency
362090015 16.65 R-4 R-1 MHDR MDR WDC Consistency
362180043 19.07 R-5 R-1 MDR MDR WDC Consistency
362690022 2.29 R-5 R-1 MDR MDR WDC Consistency
362713001 5.56 R-5 R-1 MDR MDR WDC Consistency
362713002 0.03 R-5 R-1 MDR MDR WDC Consistency
362713003 0.01 R-5 R-1 MDR MDR WDC Consistency
380060009 0.48 R-5 R-1 MDR MDR WDC Consistency
380060010 0.48 R-5 R-1 MDR MDR WDC Consistency
380311027 0.78 R-5 R-1 MDR MDR WDC Consistency
380311028 0.27 R-5 R-1 MDR MDR WDC Consistency
380322060 0.35 R-5 R-1 MDR MDR WDC Consistency
380341049 1.74 R-5 R-1 MDR MDR WDC Consistency
368331045 0.47 R-A-20000 R-1 MDR MDR WDC Consistency
368331046 0.46 R-A-20000 R-1 MDR MDR WDC Consistency
368331049 0.46 R-A-20000 R-1 MDR MDR WDC Consistency
368331050 0.49 R-A-20000 R-1 MDR MDR WDC Consistency
368331051 0.50 R-A-20000 R-1 MDR MDR WDC Consistency
366380024 0.58 ROW R-1 MDR MDR WDC Consistency
367450017 0.34 ROW R-1 MDR MDR WDC Consistency
3377
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
367450018 1.29 ROW R-1 MDR MDR WDC Consistency
367472020 1.64 ROW R-1 MDR MDR WDC Consistency
376462038 0.73 ROW R-1 MDR MDR WDC Consistency
380470039 0.48 ROW R-1 MDR MDR WDC Consistency
380470040 0.05 ROW R-1 MDR MDR WDC Consistency
380481017 0.20 ROW R-1 MDR MDR WDC Consistency
362180007 2.54 R-R R-1 MDR MDR WDC Consistency
362180011 4.03 R-R R-1 MDR MDR WDC Consistency
362240005 6.52 R-R R-1 MDR MDR WDC Consistency
362240006 4.29 R-R R-1 MDR MDR WDC Consistency
362240007 4.29 R-R R-1 MDR MDR WDC Consistency
362240008 7.06 R-R R-1 MDR MDR WDC Consistency
362240025 3.39 R-R R-1 MDR MDR WDC Consistency
362240026 5.20 R-R R-1 MDR MDR WDC Consistency
362240027 1.69 R-R R-1 MDR MDR WDC Consistency
362240028 1.97 R-R R-1 MDR MDR WDC Consistency
362240030 7.66 R-R R-1 MDR MDR WDC Consistency
362240033 3.63 R-R R-1 MDR MDR WDC Consistency
362240034 5.16 R-R R-1 MDR MDR WDC Consistency
362240036 2.32 R-R R-1 MDR MDR WDC Consistency
362240037 1.77 R-R R-1 MDR MDR WDC Consistency
362590020 0.26 R-R R-1 MDR MDR WDC Consistency
362590037 0.32 R-R R-1 MDR MDR WDC Consistency
366041023 0.35 R-R R-1 MDR MDR WDC Consistency
366041024 4.39 R-R R-1 MDR MDR WDC Consistency
366041025 0.92 R-R R-1 MDR MDR WDC Consistency
366041026 0.23 R-R R-1 MDR MDR WDC Consistency
366041027 0.23 R-R R-1 MDR MDR WDC Consistency
366041029 0.48 R-R R-1 MDR MDR WDC Consistency
366041030 0.21 R-R R-1 MDR MDR WDC Consistency
366041031 0.22 R-R R-1 MDR MDR WDC Consistency
366041032 0.50 R-R R-1 MDR MDR WDC Consistency
366041033 0.00 R-R R-1 MDR MDR WDC Consistency
366041034 0.35 R-R R-1 MDR MDR WDC Consistency
366041035 0.29 R-R R-1 MDR MDR WDC Consistency
366041036 0.08 R-R R-1 MDR MDR WDC Consistency
366041037 0.35 R-R R-1 MDR MDR WDC Consistency
366041038 0.36 R-R R-1 MDR MDR WDC Consistency
366041039 0.27 R-R R-1 MDR MDR WDC Consistency
366041040 0.27 R-R R-1 MDR MDR WDC Consistency
366041041 0.27 R-R R-1 MDR MDR WDC Consistency
366041042 0.27 R-R R-1 MDR MDR WDC Consistency
366041043 0.37 R-R R-1 MDR MDR WDC Consistency
366041044 0.92 R-R R-1 MDR MDR WDC Consistency
366041045 0.92 R-R R-1 MDR MDR WDC Consistency
366041046 0.92 R-R R-1 MDR MDR WDC Consistency
366041048 0.23 R-R R-1 MDR MDR WDC Consistency
366041049 0.23 R-R R-1 MDR MDR WDC Consistency
366050001 0.46 R-R R-1 MDR MDR WDC Consistency
366050002 4.93 R-R R-1 MDR MDR WDC Consistency
366050003 3.88 R-R R-1 MDR MDR WDC Consistency
366050004 3.87 R-R R-1 MDR MDR WDC Consistency
366050005 0.37 R-R R-1 MDR MDR WDC Consistency
3378
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
366050006 0.19 R-R R-1 MDR MDR WDC Consistency
366050007 0.19 R-R R-1 MDR MDR WDC Consistency
366050008 0.18 R-R R-1 MDR MDR WDC Consistency
366050009 0.19 R-R R-1 MDR MDR WDC Consistency
366050010 0.19 R-R R-1 MDR MDR WDC Consistency
366050011 0.19 R-R R-1 MDR MDR WDC Consistency
366050012 0.19 R-R R-1 MDR MDR WDC Consistency
366050013 0.18 R-R R-1 MDR MDR WDC Consistency
366050014 0.42 R-R R-1 MDR MDR WDC Consistency
366050015 0.20 R-R R-1 MDR MDR WDC Consistency
366050016 0.20 R-R R-1 MDR MDR WDC Consistency
366050017 0.20 R-R R-1 MDR MDR WDC Consistency
366050018 0.20 R-R R-1 MDR MDR WDC Consistency
366050019 0.40 R-R R-1 MDR MDR WDC Consistency
366050020 0.21 R-R R-1 MDR MDR WDC Consistency
366050021 0.17 R-R R-1 MDR MDR WDC Consistency
366050022 1.41 R-R R-1 MDR MDR WDC Consistency
366050024 0.59 R-R R-1 MDR MDR WDC Consistency
366050025 0.50 R-R R-1 MDR MDR WDC Consistency
366060001 0.50 R-R R-1 MDR MDR WDC Consistency
366060002 0.50 R-R R-1 MDR MDR WDC Consistency
366060003 1.02 R-R R-1 MDR MDR WDC Consistency
366060010 5.68 R-R R-1 MDR MDR WDC Consistency
366060012 0.43 R-R R-1 MDR MDR WDC Consistency
366060013 0.54 R-R R-1 MDR MDR WDC Consistency
366060014 0.54 R-R R-1 MDR MDR WDC Consistency
366060015 0.54 R-R R-1 MDR MDR WDC Consistency
366060016 0.54 R-R R-1 MDR MDR WDC Consistency
366060017 0.69 R-R R-1 MDR MDR WDC Consistency
366060018 0.70 R-R R-1 MDR MDR WDC Consistency
366060020 0.70 R-R R-1 MDR MDR WDC Consistency
366060023 0.50 R-R R-1 MDR MDR WDC Consistency
366060024 0.57 R-R R-1 MDR MDR WDC Consistency
366060025 0.50 R-R R-1 MDR MDR WDC Consistency
366060026 1.29 R-R R-1 MDR MDR WDC Consistency
366060027 1.29 R-R R-1 MDR MDR WDC Consistency
366060028 1.23 R-R R-1 MDR MDR WDC Consistency
366060029 1.23 R-R R-1 MDR MDR WDC Consistency
366070001 2.00 R-R R-1 MDR MDR WDC Consistency
366070007 1.82 R-R R-1 MDR MDR WDC Consistency
366070008 0.74 R-R R-1 MDR MDR WDC Consistency
366070009 0.61 R-R R-1 MDR MDR WDC Consistency
366070011 1.84 R-R R-1 MDR MDR WDC Consistency
366081001 0.55 R-R R-1 MDR MDR WDC Consistency
366081004 0.02 R-R R-1 MDR MDR WDC Consistency
366081006 0.68 R-R R-1 MDR MDR WDC Consistency
366081007 0.41 R-R R-1 MDR MDR WDC Consistency
366091001 0.83 R-R R-1 MDR MDR WDC Consistency
366091002 0.83 R-R R-1 MDR MDR WDC Consistency
366091003 0.83 R-R R-1 MDR MDR WDC Consistency
366091004 0.85 R-R R-1 MDR MDR WDC Consistency
366091005 0.22 R-R R-1 MDR MDR WDC Consistency
366091006 0.22 R-R R-1 MDR MDR WDC Consistency
3379
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
366091007 0.21 R-R R-1 MDR MDR WDC Consistency
366091008 0.20 R-R R-1 MDR MDR WDC Consistency
366091010 0.27 R-R R-1 MDR MDR WDC Consistency
366091015 0.11 R-R R-1 MDR MDR WDC Consistency
366091022 0.11 R-R R-1 MDR MDR WDC Consistency
366091026 0.32 R-R R-1 MDR MDR WDC Consistency
366091028 0.02 R-R R-1 MDR MDR WDC Consistency
366091029 0.67 R-R R-1 MDR MDR WDC Consistency
366091030 0.42 R-R R-1 MDR MDR WDC Consistency
366091032 0.29 R-R R-1 MDR MDR WDC Consistency
366091033 0.35 R-R R-1 MDR MDR WDC Consistency
366101001 0.64 R-R R-1 MDR MDR WDC Consistency
366101002 0.20 R-R R-1 MDR MDR WDC Consistency
366101003 0.87 R-R R-1 MDR MDR WDC Consistency
366101004 0.85 R-R R-1 MDR MDR WDC Consistency
366101005 0.85 R-R R-1 MDR MDR WDC Consistency
366101006 0.85 R-R R-1 MDR MDR WDC Consistency
366101007 0.21 R-R R-1 MDR MDR WDC Consistency
366101008 0.64 R-R R-1 MDR MDR WDC Consistency
366101011 0.83 R-R R-1 MDR MDR WDC Consistency
366101012 0.17 R-R R-1 MDR MDR WDC Consistency
366101013 0.18 R-R R-1 MDR MDR WDC Consistency
366101014 0.18 R-R R-1 MDR MDR WDC Consistency
366101015 0.18 R-R R-1 MDR MDR WDC Consistency
366101017 0.49 R-R R-1 MDR MDR WDC Consistency
366101018 0.49 R-R R-1 MDR MDR WDC Consistency
366101019 0.54 R-R R-1 MDR MDR WDC Consistency
366102002 0.47 R-R R-1 MDR MDR WDC Consistency
366102003 0.70 R-R R-1 MDR MDR WDC Consistency
366102004 0.87 R-R R-1 MDR MDR WDC Consistency
366102005 0.40 R-R R-1 MDR MDR WDC Consistency
366102006 0.19 R-R R-1 MDR MDR WDC Consistency
366102007 0.30 R-R R-1 MDR MDR WDC Consistency
366102008 0.35 R-R R-1 MDR MDR WDC Consistency
366102009 0.27 R-R R-1 MDR MDR WDC Consistency
366111001 0.34 R-R R-1 MDR MDR WDC Consistency
366111002 0.25 R-R R-1 MDR MDR WDC Consistency
366111003 0.24 R-R R-1 MDR MDR WDC Consistency
366111004 0.86 R-R R-1 MDR MDR WDC Consistency
366111005 0.85 R-R R-1 MDR MDR WDC Consistency
366111006 0.85 R-R R-1 MDR MDR WDC Consistency
366111007 0.85 R-R R-1 MDR MDR WDC Consistency
366111008 0.81 R-R R-1 MDR MDR WDC Consistency
366111009 0.79 R-R R-1 MDR MDR WDC Consistency
366111010 0.83 R-R R-1 MDR MDR WDC Consistency
366111011 0.83 R-R R-1 MDR MDR WDC Consistency
366111012 0.83 R-R R-1 MDR MDR WDC Consistency
366112001 0.30 R-R R-1 MDR MDR WDC Consistency
366112002 0.27 R-R R-1 MDR MDR WDC Consistency
366112003 0.88 R-R R-1 MDR MDR WDC Consistency
366112004 0.44 R-R R-1 MDR MDR WDC Consistency
366112005 0.44 R-R R-1 MDR MDR WDC Consistency
366112006 0.88 R-R R-1 MDR MDR WDC Consistency
3380
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
366112007 0.84 R-R R-1 MDR MDR WDC Consistency
366112008 0.84 R-R R-1 MDR MDR WDC Consistency
366112009 0.88 R-R R-1 MDR MDR WDC Consistency
366112012 0.15 R-R R-1 MDR MDR WDC Consistency
366112013 0.44 R-R R-1 MDR MDR WDC Consistency
366112014 0.15 R-R R-1 MDR MDR WDC Consistency
366112015 0.16 R-R R-1 MDR MDR WDC Consistency
366112016 0.86 R-R R-1 MDR MDR WDC Consistency
366112017 0.68 R-R R-1 MDR MDR WDC Consistency
366120007 0.24 R-R R-1 MDR MDR WDC Consistency
366120008 0.26 R-R R-1 MDR MDR WDC Consistency
366120009 0.48 R-R R-1 MDR MDR WDC Consistency
366120025 0.43 R-R R-1 MDR MDR WDC Consistency
366120037 0.67 R-R R-1 MDR MDR WDC Consistency
366120041 1.16 R-R R-1 MDR MDR WDC Consistency
366120048 0.53 R-R R-1 MDR MDR WDC Consistency
366150027 1.89 R-R R-1 MDR MDR WDC Consistency
366150028 1.01 R-R R-1 MDR MDR WDC Consistency
366150029 0.53 R-R R-1 MDR MDR WDC Consistency
366150030 0.51 R-R R-1 MDR MDR WDC Consistency
366160007 0.88 R-R R-1 MDR MDR WDC Consistency
366160065 0.88 R-R R-1 MDR MDR WDC Consistency
366160068 0.84 R-R R-1 MDR MDR WDC Consistency
366160071 0.84 R-R R-1 MDR MDR WDC Consistency
366160076 6.59 R-R R-1 MDR MDR WDC Consistency
366160077 0.96 R-R R-1 MDR MDR WDC Consistency
366170003 0.69 R-R R-1 MDR MDR WDC Consistency
366170059 11.06 R-R R-1 MDR MDR WDC Consistency
366182001 0.91 R-R R-1 MDR MDR WDC Consistency
366182002 0.66 R-R R-1 MDR MDR WDC Consistency
366182010 0.19 R-R R-1 MDR MDR WDC Consistency
366182011 0.19 R-R R-1 MDR MDR WDC Consistency
366182013 0.39 R-R R-1 MDR MDR WDC Consistency
366182014 0.99 R-R R-1 MDR MDR WDC Consistency
366182015 0.47 R-R R-1 MDR MDR WDC Consistency
366182016 0.20 R-R R-1 MDR MDR WDC Consistency
366182017 0.20 R-R R-1 MDR MDR WDC Consistency
366182018 0.20 R-R R-1 MDR MDR WDC Consistency
366182019 0.20 R-R R-1 MDR MDR WDC Consistency
366182020 0.20 R-R R-1 MDR MDR WDC Consistency
366182021 0.29 R-R R-1 MDR MDR WDC Consistency
366182024 0.30 R-R R-1 MDR MDR WDC Consistency
366182025 0.20 R-R R-1 MDR MDR WDC Consistency
366182026 0.20 R-R R-1 MDR MDR WDC Consistency
366182027 0.20 R-R R-1 MDR MDR WDC Consistency
366182028 0.20 R-R R-1 MDR MDR WDC Consistency
366182029 0.20 R-R R-1 MDR MDR WDC Consistency
366182030 0.29 R-R R-1 MDR MDR WDC Consistency
366182055 0.24 R-R R-1 MDR MDR WDC Consistency
366182056 0.24 R-R R-1 MDR MDR WDC Consistency
366182057 0.09 R-R R-1 MDR MDR WDC Consistency
366182058 0.19 R-R R-1 MDR MDR WDC Consistency
366182059 0.22 R-R R-1 MDR MDR WDC Consistency
3381
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
366182060 0.23 R-R R-1 MDR MDR WDC Consistency
366182061 0.17 R-R R-1 MDR MDR WDC Consistency
366182062 0.17 R-R R-1 MDR MDR WDC Consistency
366182063 0.67 R-R R-1 MDR MDR WDC Consistency
366182066 0.26 R-R R-1 MDR MDR WDC Consistency
366190006 0.24 R-R R-1 MDR MDR WDC Consistency
366190007 0.24 R-R R-1 MDR MDR WDC Consistency
366190010 0.21 R-R R-1 MDR MDR WDC Consistency
366190013 0.23 R-R R-1 MDR MDR WDC Consistency
366190014 0.23 R-R R-1 MDR MDR WDC Consistency
366190015 0.23 R-R R-1 MDR MDR WDC Consistency
366190016 0.27 R-R R-1 MDR MDR WDC Consistency
366190017 0.27 R-R R-1 MDR MDR WDC Consistency
366190018 0.27 R-R R-1 MDR MDR WDC Consistency
366190019 0.27 R-R R-1 MDR MDR WDC Consistency
366190020 0.27 R-R R-1 MDR MDR WDC Consistency
366190026 0.19 R-R R-1 MDR MDR WDC Consistency
366190027 0.21 R-R R-1 MDR MDR WDC Consistency
366190028 0.24 R-R R-1 MDR MDR WDC Consistency
366190029 0.24 R-R R-1 MDR MDR WDC Consistency
366190030 0.22 R-R R-1 MDR MDR WDC Consistency
366190031 0.21 R-R R-1 MDR MDR WDC Consistency
366190032 0.25 R-R R-1 MDR MDR WDC Consistency
366190034 0.24 R-R R-1 MDR MDR WDC Consistency
366190035 0.22 R-R R-1 MDR MDR WDC Consistency
366190036 0.22 R-R R-1 MDR MDR WDC Consistency
366190037 0.22 R-R R-1 MDR MDR WDC Consistency
366190042 1.06 R-R R-1 MDR MDR WDC Consistency
366190043 0.76 R-R R-1 MDR MDR WDC Consistency
366190044 0.65 R-R R-1 MDR MDR WDC Consistency
366190045 0.88 R-R R-1 MDR MDR WDC Consistency
366190046 0.55 R-R R-1 MDR MDR WDC Consistency
366190047 0.24 R-R R-1 MDR MDR WDC Consistency
366190050 0.03 R-R R-1 MDR MDR WDC Consistency
366190051 0.45 R-R R-1 MDR MDR WDC Consistency
366190052 0.48 R-R R-1 MDR MDR WDC Consistency
366190053 0.19 R-R R-1 MDR MDR WDC Consistency
366190054 0.16 R-R R-1 MDR MDR WDC Consistency
366190055 0.46 R-R R-1 MDR MDR WDC Consistency
366190057 0.21 R-R R-1 MDR MDR WDC Consistency
366190058 0.21 R-R R-1 MDR MDR WDC Consistency
366190063 0.98 R-R R-1 MDR MDR WDC Consistency
366190064 0.67 R-R R-1 MDR MDR WDC Consistency
366200006 0.17 R-R R-1 MDR MDR WDC Consistency
366200007 0.17 R-R R-1 MDR MDR WDC Consistency
366200008 0.18 R-R R-1 MDR MDR WDC Consistency
366200019 0.66 R-R R-1 MDR MDR WDC Consistency
366200020 0.45 R-R R-1 MDR MDR WDC Consistency
366200022 0.22 R-R R-1 MDR MDR WDC Consistency
366200023 0.22 R-R R-1 MDR MDR WDC Consistency
366200024 0.22 R-R R-1 MDR MDR WDC Consistency
366200025 0.23 R-R R-1 MDR MDR WDC Consistency
366200026 1.24 R-R R-1 MDR MDR WDC Consistency
3382
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
366200027 0.54 R-R R-1 MDR MDR WDC Consistency
366200028 1.08 R-R R-1 MDR MDR WDC Consistency
366200029 1.10 R-R R-1 MDR MDR WDC Consistency
366200030 0.71 R-R R-1 MDR MDR WDC Consistency
366200032 0.88 R-R R-1 MDR MDR WDC Consistency
366200033 0.90 R-R R-1 MDR MDR WDC Consistency
366200034 0.34 R-R R-1 MDR MDR WDC Consistency
366200035 0.41 R-R R-1 MDR MDR WDC Consistency
366200036 0.67 R-R R-1 MDR MDR WDC Consistency
366200037 0.10 R-R R-1 MDR MDR WDC Consistency
366200038 0.20 R-R R-1 MDR MDR WDC Consistency
366200039 0.08 R-R R-1 MDR MDR WDC Consistency
366200040 1.34 R-R R-1 MDR MDR WDC Consistency
366210008 0.81 R-R R-1 MDR MDR WDC Consistency
366210009 1.08 R-R R-1 MDR MDR WDC Consistency
366210010 0.44 R-R R-1 MDR MDR WDC Consistency
366210012 4.74 R-R R-1 MDR MDR WDC Consistency
366210018 0.48 R-R R-1 MDR MDR WDC Consistency
366210019 0.50 R-R R-1 MDR MDR WDC Consistency
366210020 0.51 R-R R-1 MDR MDR WDC Consistency
366210031 0.78 R-R R-1 MDR MDR WDC Consistency
366210032 0.75 R-R R-1 MDR MDR WDC Consistency
366210033 0.75 R-R R-1 MDR MDR WDC Consistency
366210034 0.75 R-R R-1 MDR MDR WDC Consistency
366210050 1.43 R-R R-1 MDR MDR WDC Consistency
366210051 1.43 R-R R-1 MDR MDR WDC Consistency
366260001 1.21 R-R R-1 MDR MDR WDC Consistency
366260002 0.44 R-R R-1 MDR MDR WDC Consistency
366260003 1.09 R-R R-1 MDR MDR WDC Consistency
366260008 0.76 R-R R-1 MDR MDR WDC Consistency
366260012 1.24 R-R R-1 MDR MDR WDC Consistency
366260013 1.12 R-R R-1 MDR MDR WDC Consistency
366260014 1.49 R-R R-1 MDR MDR WDC Consistency
366260015 0.69 R-R R-1 MDR MDR WDC Consistency
366260017 0.69 R-R R-1 MDR MDR WDC Consistency
366260020 0.17 R-R R-1 MDR MDR WDC Consistency
366260021 0.52 R-R R-1 MDR MDR WDC Consistency
366260023 0.92 R-R R-1 MDR MDR WDC Consistency
366260024 0.39 R-R R-1 MDR MDR WDC Consistency
366260026 0.17 R-R R-1 MDR MDR WDC Consistency
366260027 0.17 R-R R-1 MDR MDR WDC Consistency
366260028 0.17 R-R R-1 MDR MDR WDC Consistency
366260029 0.17 R-R R-1 MDR MDR WDC Consistency
366260030 0.33 R-R R-1 MDR MDR WDC Consistency
366260031 0.33 R-R R-1 MDR MDR WDC Consistency
366260032 0.21 R-R R-1 MDR MDR WDC Consistency
366260033 0.41 R-R R-1 MDR MDR WDC Consistency
366260037 0.43 R-R R-1 MDR MDR WDC Consistency
366260038 0.43 R-R R-1 MDR MDR WDC Consistency
366260039 0.43 R-R R-1 MDR MDR WDC Consistency
366260040 0.43 R-R R-1 MDR MDR WDC Consistency
366260042 0.50 R-R R-1 MDR MDR WDC Consistency
366260043 0.30 R-R R-1 MDR MDR WDC Consistency
3383
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
366260044 0.30 R-R R-1 MDR MDR WDC Consistency
366260048 0.48 R-R R-1 MDR MDR WDC Consistency
366260049 0.33 R-R R-1 MDR MDR WDC Consistency
366260050 0.88 R-R R-1 MDR MDR WDC Consistency
366260051 1.24 R-R R-1 MDR MDR WDC Consistency
366270001 0.25 R-R R-1 MDR MDR WDC Consistency
366270002 0.25 R-R R-1 MDR MDR WDC Consistency
366270003 0.25 R-R R-1 MDR MDR WDC Consistency
366270004 0.25 R-R R-1 MDR MDR WDC Consistency
366270005 0.25 R-R R-1 MDR MDR WDC Consistency
366270006 0.25 R-R R-1 MDR MDR WDC Consistency
366270007 0.25 R-R R-1 MDR MDR WDC Consistency
366270008 0.25 R-R R-1 MDR MDR WDC Consistency
366270009 0.61 R-R R-1 MDR MDR WDC Consistency
366270011 0.43 R-R R-1 MDR MDR WDC Consistency
366270012 0.23 R-R R-1 MDR MDR WDC Consistency
366270013 0.23 R-R R-1 MDR MDR WDC Consistency
366270014 0.23 R-R R-1 MDR MDR WDC Consistency
366270015 0.23 R-R R-1 MDR MDR WDC Consistency
366270016 0.23 R-R R-1 MDR MDR WDC Consistency
366270017 0.23 R-R R-1 MDR MDR WDC Consistency
366270018 0.23 R-R R-1 MDR MDR WDC Consistency
366270019 0.23 R-R R-1 MDR MDR WDC Consistency
366270022 2.86 R-R R-1 MDR MDR WDC Consistency
366270023 0.25 R-R R-1 MDR MDR WDC Consistency
366270024 0.25 R-R R-1 MDR MDR WDC Consistency
366270028 0.50 R-R R-1 MDR MDR WDC Consistency
366270029 0.69 R-R R-1 MDR MDR WDC Consistency
366270031 2.40 R-R R-1 MDR MDR WDC Consistency
366270032 0.72 R-R R-1 MDR MDR WDC Consistency
366270033 0.72 R-R R-1 MDR MDR WDC Consistency
366270034 0.71 R-R R-1 MDR MDR WDC Consistency
366270035 0.71 R-R R-1 MDR MDR WDC Consistency
366270036 0.78 R-R R-1 MDR MDR WDC Consistency
366270037 0.79 R-R R-1 MDR MDR WDC Consistency
366280002 0.73 R-R R-1 MDR MDR WDC Consistency
366280003 0.07 R-R R-1 MDR MDR WDC Consistency
366280004 0.26 R-R R-1 MDR MDR WDC Consistency
366280005 0.26 R-R R-1 MDR MDR WDC Consistency
366280006 0.26 R-R R-1 MDR MDR WDC Consistency
366280007 0.26 R-R R-1 MDR MDR WDC Consistency
366280008 0.23 R-R R-1 MDR MDR WDC Consistency
366280009 0.27 R-R R-1 MDR MDR WDC Consistency
366280010 0.41 R-R R-1 MDR MDR WDC Consistency
366280011 0.21 R-R R-1 MDR MDR WDC Consistency
366280012 0.21 R-R R-1 MDR MDR WDC Consistency
366280013 0.25 R-R R-1 MDR MDR WDC Consistency
366280014 0.29 R-R R-1 MDR MDR WDC Consistency
366280015 0.29 R-R R-1 MDR MDR WDC Consistency
366280016 0.32 R-R R-1 MDR MDR WDC Consistency
366280024 2.38 R-R R-1 MDR MDR WDC Consistency
366280027 1.17 R-R R-1 MDR MDR WDC Consistency
366280028 1.20 R-R R-1 MDR MDR WDC Consistency
3384
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
366280030 0.50 R-R R-1 MDR MDR WDC Consistency
366280032 0.56 R-R R-1 MDR MDR WDC Consistency
366280038 0.70 R-R R-1 MDR MDR WDC Consistency
366280039 0.70 R-R R-1 MDR MDR WDC Consistency
366300001 2.94 R-R R-1 MDR MDR WDC Consistency
366300025 1.31 R-R R-1 MDR MDR WDC Consistency
366300026 1.31 R-R R-1 MDR MDR WDC Consistency
366300035 2.29 R-R R-1 MDR MDR WDC Consistency
366300049 0.50 R-R R-1 MDR MDR WDC Consistency
366300050 0.50 R-R R-1 MDR MDR WDC Consistency
366300051 1.08 R-R R-1 MDR MDR WDC Consistency
366320054 1.32 R-R R-1 MDR MDR WDC Consistency
366330012 2.42 R-R R-1 MDR MDR WDC Consistency
366330013 2.42 R-R R-1 MDR MDR WDC Consistency
366330014 1.06 R-R R-1 MDR MDR WDC Consistency
366330015 1.08 R-R R-1 MDR MDR WDC Consistency
366380016 1.21 R-R R-1 MDR MDR WDC Consistency
366380017 1.21 R-R R-1 MDR MDR WDC Consistency
366380018 1.07 R-R R-1 MDR MDR WDC Consistency
366380019 1.01 R-R R-1 MDR MDR WDC Consistency
366380020 1.13 R-R R-1 MDR MDR WDC Consistency
366380021 1.23 R-R R-1 MDR MDR WDC Consistency
366380022 1.15 R-R R-1 MDR MDR WDC Consistency
366380023 1.16 R-R R-1 MDR MDR WDC Consistency
367040003 1.91 R-R R-1 MDR MDR WDC Consistency
367040004 0.22 R-R R-1 MDR MDR WDC Consistency
367040005 0.22 R-R R-1 MDR MDR WDC Consistency
367040006 2.36 R-R R-1 MDR MDR WDC Consistency
367040007 1.18 R-R R-1 MDR MDR WDC Consistency
367040008 0.29 R-R R-1 MDR MDR WDC Consistency
367040010 0.51 R-R R-1 MDR MDR WDC Consistency
367040011 0.11 R-R R-1 MDR MDR WDC Consistency
367040014 0.21 R-R R-1 MDR MDR WDC Consistency
367040015 0.28 R-R R-1 MDR MDR WDC Consistency
367040016 0.29 R-R R-1 MDR MDR WDC Consistency
367040017 0.29 R-R R-1 MDR MDR WDC Consistency
367040018 0.31 R-R R-1 MDR MDR WDC Consistency
367040021 0.24 R-R R-1 MDR MDR WDC Consistency
367040024 0.24 R-R R-1 MDR MDR WDC Consistency
367040026 0.06 R-R R-1 MDR MDR WDC Consistency
367040027 0.07 R-R R-1 MDR MDR WDC Consistency
367040028 0.29 R-R R-1 MDR MDR WDC Consistency
367040029 0.30 R-R R-1 MDR MDR WDC Consistency
367210018 28.52 R-R R-1 EDR-RC MDR WDC Consistency
367250007 27.06 R-R R-1 MDR MDR WDC Consistency
368030030 2.59 R-R R-1 MDR MDR WDC Consistency
368030033 1.02 R-R R-1 MDR MDR WDC Consistency
368091013 0.21 R-R R-1 MDR MDR WDC Consistency
368091014 0.19 R-R R-1 MDR MDR WDC Consistency
368091015 0.18 R-R R-1 MDR MDR WDC Consistency
368091017 0.18 R-R R-1 MDR MDR WDC Consistency
368091019 0.18 R-R R-1 MDR MDR WDC Consistency
368091020 0.18 R-R R-1 MDR MDR WDC Consistency
3385
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
368091022 0.19 R-R R-1 MDR MDR WDC Consistency
368091028 0.18 R-R R-1 MDR MDR WDC Consistency
368091029 0.18 R-R R-1 MDR MDR WDC Consistency
368091030 0.19 R-R R-1 MDR MDR WDC Consistency
368091031 0.18 R-R R-1 MDR MDR WDC Consistency
368091032 0.19 R-R R-1 MDR MDR WDC Consistency
368092010 0.18 R-R R-1 MDR MDR WDC Consistency
368092011 0.22 R-R R-1 MDR MDR WDC Consistency
368092012 0.18 R-R R-1 MDR MDR WDC Consistency
368092013 0.18 R-R R-1 MDR MDR WDC Consistency
368092014 0.18 R-R R-1 MDR MDR WDC Consistency
368092015 0.22 R-R R-1 MDR MDR WDC Consistency
368092017 0.18 R-R R-1 MDR MDR WDC Consistency
368092019 0.18 R-R R-1 MDR MDR WDC Consistency
368092021 0.18 R-R R-1 MDR MDR WDC Consistency
368092023 0.18 R-R R-1 MDR MDR WDC Consistency
368092024 0.19 R-R R-1 MDR MDR WDC Consistency
368092026 0.18 R-R R-1 MDR MDR WDC Consistency
368092027 0.18 R-R R-1 MDR MDR WDC Consistency
368092028 0.19 R-R R-1 MDR MDR WDC Consistency
368092029 0.19 R-R R-1 MDR MDR WDC Consistency
368092030 0.18 R-R R-1 MDR MDR WDC Consistency
368092031 0.18 R-R R-1 MDR MDR WDC Consistency
368092033 0.18 R-R R-1 MDR MDR WDC Consistency
368092035 0.19 R-R R-1 MDR MDR WDC Consistency
368092036 0.18 R-R R-1 MDR MDR WDC Consistency
368092038 0.19 R-R R-1 MDR MDR WDC Consistency
368092039 0.19 R-R R-1 MDR MDR WDC Consistency
368092041 0.18 R-R R-1 MDR MDR WDC Consistency
368092042 0.18 R-R R-1 MDR MDR WDC Consistency
368093008 0.54 R-R R-1 MDR MDR WDC Consistency
368093017 0.22 R-R R-1 MDR MDR WDC Consistency
368093023 0.21 R-R R-1 MDR MDR WDC Consistency
368093026 0.23 R-R R-1 MDR MDR WDC Consistency
368093027 0.24 R-R R-1 MDR MDR WDC Consistency
368093029 0.20 R-R R-1 MDR MDR WDC Consistency
368093030 0.22 R-R R-1 MDR MDR WDC Consistency
368093031 0.22 R-R R-1 MDR MDR WDC Consistency
368093032 0.22 R-R R-1 MDR MDR WDC Consistency
368093033 0.21 R-R R-1 MDR MDR WDC Consistency
368093034 0.21 R-R R-1 MDR MDR WDC Consistency
368093035 0.10 R-R R-1 MDR MDR WDC Consistency
368093036 0.18 R-R R-1 MDR MDR WDC Consistency
376021001 0.60 R-R R-1 MDR MDR WDC Consistency
376021002 0.26 R-R R-1 MDR MDR WDC Consistency
376021003 0.17 R-R R-1 MDR MDR WDC Consistency
376021004 0.17 R-R R-1 MDR MDR WDC Consistency
376021005 0.17 R-R R-1 MDR MDR WDC Consistency
376021006 0.17 R-R R-1 MDR MDR WDC Consistency
376021007 0.18 R-R R-1 MDR MDR WDC Consistency
376021008 0.17 R-R R-1 MDR MDR WDC Consistency
376021009 0.18 R-R R-1 MDR MDR WDC Consistency
376021010 0.17 R-R R-1 MDR MDR WDC Consistency
3386
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
376021011 0.17 R-R R-1 MDR MDR WDC Consistency
376021012 0.17 R-R R-1 MDR MDR WDC Consistency
376021013 0.17 R-R R-1 MDR MDR WDC Consistency
376021014 0.17 R-R R-1 MDR MDR WDC Consistency
376021016 0.17 R-R R-1 MDR MDR WDC Consistency
376021017 0.35 R-R R-1 MDR MDR WDC Consistency
376021018 0.35 R-R R-1 MDR MDR WDC Consistency
376021019 0.17 R-R R-1 MDR MDR WDC Consistency
376021020 0.17 R-R R-1 MDR MDR WDC Consistency
376022001 0.21 R-R R-1 MDR MDR WDC Consistency
376022002 0.22 R-R R-1 MDR MDR WDC Consistency
376022003 0.26 R-R R-1 MDR MDR WDC Consistency
376022004 0.17 R-R R-1 MDR MDR WDC Consistency
376022006 0.17 R-R R-1 MDR MDR WDC Consistency
376022007 0.17 R-R R-1 MDR MDR WDC Consistency
376022008 0.17 R-R R-1 MDR MDR WDC Consistency
376022009 0.17 R-R R-1 MDR MDR WDC Consistency
376022010 0.17 R-R R-1 MDR MDR WDC Consistency
376022011 0.17 R-R R-1 MDR MDR WDC Consistency
376022012 0.26 R-R R-1 MDR MDR WDC Consistency
376022013 0.26 R-R R-1 MDR MDR WDC Consistency
376022014 0.17 R-R R-1 MDR MDR WDC Consistency
376022015 0.17 R-R R-1 MDR MDR WDC Consistency
376022016 0.35 R-R R-1 MDR MDR WDC Consistency
376022017 0.17 R-R R-1 MDR MDR WDC Consistency
376022018 0.17 R-R R-1 MDR MDR WDC Consistency
376022019 0.18 R-R R-1 MDR MDR WDC Consistency
376022020 0.17 R-R R-1 MDR MDR WDC Consistency
376022021 0.17 R-R R-1 MDR MDR WDC Consistency
376023003 0.18 R-R R-1 MDR MDR WDC Consistency
376023004 0.18 R-R R-1 MDR MDR WDC Consistency
376023005 0.18 R-R R-1 MDR MDR WDC Consistency
376023006 0.20 R-R R-1 MDR MDR WDC Consistency
376023007 0.18 R-R R-1 MDR MDR WDC Consistency
376023008 0.18 R-R R-1 MDR MDR WDC Consistency
376023009 0.17 R-R R-1 MDR MDR WDC Consistency
376023010 0.19 R-R R-1 MDR MDR WDC Consistency
376023011 0.21 R-R R-1 MDR MDR WDC Consistency
376023012 0.19 R-R R-1 MDR MDR WDC Consistency
376023013 0.19 R-R R-1 MDR MDR WDC Consistency
376023014 0.21 R-R R-1 MDR MDR WDC Consistency
376023015 0.21 R-R R-1 MDR MDR WDC Consistency
376023016 0.20 R-R R-1 MDR MDR WDC Consistency
376023017 0.20 R-R R-1 MDR MDR WDC Consistency
376023018 0.21 R-R R-1 MDR MDR WDC Consistency
376023019 0.19 R-R R-1 MDR MDR WDC Consistency
376023020 0.18 R-R R-1 MDR MDR WDC Consistency
376023021 0.18 R-R R-1 MDR MDR WDC Consistency
376023022 0.18 R-R R-1 MDR MDR WDC Consistency
376023023 0.20 R-R R-1 MDR MDR WDC Consistency
376023024 0.18 R-R R-1 MDR MDR WDC Consistency
376023025 0.18 R-R R-1 MDR MDR WDC Consistency
376023026 0.19 R-R R-1 MDR MDR WDC Consistency
3387
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
376024001 0.17 R-R R-1 MDR MDR WDC Consistency
376024002 0.17 R-R R-1 MDR MDR WDC Consistency
376024003 0.17 R-R R-1 MDR MDR WDC Consistency
376024004 0.17 R-R R-1 MDR MDR WDC Consistency
376024005 0.35 R-R R-1 MDR MDR WDC Consistency
376024006 0.17 R-R R-1 MDR MDR WDC Consistency
376024007 0.17 R-R R-1 MDR MDR WDC Consistency
376024008 0.17 R-R R-1 MDR MDR WDC Consistency
376024009 0.17 R-R R-1 MDR MDR WDC Consistency
376024010 0.35 R-R R-1 MDR MDR WDC Consistency
376024011 0.34 R-R R-1 MDR MDR WDC Consistency
376024012 0.17 R-R R-1 MDR MDR WDC Consistency
376024013 0.17 R-R R-1 MDR MDR WDC Consistency
376024014 0.17 R-R R-1 MDR MDR WDC Consistency
376024015 0.34 R-R R-1 MDR MDR WDC Consistency
376024016 0.17 R-R R-1 MDR MDR WDC Consistency
376024017 0.17 R-R R-1 MDR MDR WDC Consistency
376024018 0.17 R-R R-1 MDR MDR WDC Consistency
376024019 0.17 R-R R-1 MDR MDR WDC Consistency
376024020 0.17 R-R R-1 MDR MDR WDC Consistency
376031003 0.35 R-R R-1 MDR MDR WDC Consistency
376031004 0.17 R-R R-1 MDR MDR WDC Consistency
376031005 0.18 R-R R-1 MDR MDR WDC Consistency
376031006 0.35 R-R R-1 MDR MDR WDC Consistency
376031007 0.26 R-R R-1 MDR MDR WDC Consistency
376031008 0.26 R-R R-1 MDR MDR WDC Consistency
376031009 0.17 R-R R-1 MDR MDR WDC Consistency
376031010 0.17 R-R R-1 MDR MDR WDC Consistency
376031011 0.17 R-R R-1 MDR MDR WDC Consistency
376031012 0.17 R-R R-1 MDR MDR WDC Consistency
376031013 0.17 R-R R-1 MDR MDR WDC Consistency
376031014 0.17 R-R R-1 MDR MDR WDC Consistency
376031015 0.18 R-R R-1 MDR MDR WDC Consistency
376031016 0.35 R-R R-1 MDR MDR WDC Consistency
376031018 0.17 R-R R-1 MDR MDR WDC Consistency
376031019 0.17 R-R R-1 MDR MDR WDC Consistency
376031020 0.17 R-R R-1 MDR MDR WDC Consistency
376031021 0.17 R-R R-1 MDR MDR WDC Consistency
376031022 0.17 R-R R-1 MDR MDR WDC Consistency
376031023 0.17 R-R R-1 MDR MDR WDC Consistency
376032001 0.17 R-R R-1 MDR MDR WDC Consistency
376032002 0.17 R-R R-1 MDR MDR WDC Consistency
376032003 0.17 R-R R-1 MDR MDR WDC Consistency
376032004 0.18 R-R R-1 MDR MDR WDC Consistency
376032005 0.18 R-R R-1 MDR MDR WDC Consistency
376032006 0.18 R-R R-1 MDR MDR WDC Consistency
376032007 0.18 R-R R-1 MDR MDR WDC Consistency
376032008 0.18 R-R R-1 MDR MDR WDC Consistency
376032009 0.22 R-R R-1 MDR MDR WDC Consistency
376032010 0.38 R-R R-1 MDR MDR WDC Consistency
376032011 0.21 R-R R-1 MDR MDR WDC Consistency
376032012 0.17 R-R R-1 MDR MDR WDC Consistency
376032013 0.17 R-R R-1 MDR MDR WDC Consistency
3388
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
376032014 0.17 R-R R-1 MDR MDR WDC Consistency
376032015 0.37 R-R R-1 MDR MDR WDC Consistency
376032016 0.55 R-R R-1 MDR MDR WDC Consistency
376032017 0.22 R-R R-1 MDR MDR WDC Consistency
376032018 0.23 R-R R-1 MDR MDR WDC Consistency
376032019 0.18 R-R R-1 MDR MDR WDC Consistency
376032020 0.18 R-R R-1 MDR MDR WDC Consistency
376041001 0.33 R-R R-1 MDR MDR WDC Consistency
376041002 0.34 R-R R-1 MDR MDR WDC Consistency
376041003 0.36 R-R R-1 MDR MDR WDC Consistency
376041006 0.34 R-R R-1 MDR MDR WDC Consistency
376041007 0.26 R-R R-1 MDR MDR WDC Consistency
376041009 0.19 R-R R-1 MDR MDR WDC Consistency
376041010 0.18 R-R R-1 MDR MDR WDC Consistency
376041011 0.19 R-R R-1 MDR MDR WDC Consistency
376042001 0.19 R-R R-1 MDR MDR WDC Consistency
376042002 0.45 R-R R-1 MDR MDR WDC Consistency
376042003 0.44 R-R R-1 MDR MDR WDC Consistency
376042004 0.23 R-R R-1 MDR MDR WDC Consistency
376042005 0.23 R-R R-1 MDR MDR WDC Consistency
376042006 0.23 R-R R-1 MDR MDR WDC Consistency
376042007 0.29 R-R R-1 MDR MDR WDC Consistency
376042008 0.18 R-R R-1 MDR MDR WDC Consistency
376042009 0.18 R-R R-1 MDR MDR WDC Consistency
376042010 0.21 R-R R-1 MDR MDR WDC Consistency
376042011 0.21 R-R R-1 MDR MDR WDC Consistency
376043004 0.26 R-R R-1 MDR MDR WDC Consistency
376043005 0.31 R-R R-1 MDR MDR WDC Consistency
376043006 0.30 R-R R-1 MDR MDR WDC Consistency
376043007 0.30 R-R R-1 MDR MDR WDC Consistency
376043008 0.29 R-R R-1 MDR MDR WDC Consistency
376043009 0.29 R-R R-1 MDR MDR WDC Consistency
376043010 0.28 R-R R-1 MDR MDR WDC Consistency
376043011 0.28 R-R R-1 MDR MDR WDC Consistency
376043012 0.27 R-R R-1 MDR MDR WDC Consistency
376043013 0.32 R-R R-1 MDR MDR WDC Consistency
376043014 0.64 R-R R-1 MDR MDR WDC Consistency
376043015 0.41 R-R R-1 MDR MDR WDC Consistency
376043016 0.20 R-R R-1 MDR MDR WDC Consistency
376043017 0.20 R-R R-1 MDR MDR WDC Consistency
376043018 0.42 R-R R-1 MDR MDR WDC Consistency
376043019 0.21 R-R R-1 MDR MDR WDC Consistency
376043020 0.18 R-R R-1 MDR MDR WDC Consistency
376043021 0.18 R-R R-1 MDR MDR WDC Consistency
376043026 2.03 R-R R-1 MDR MDR WDC Consistency
376051007 0.20 R-R R-1 MDR MDR WDC Consistency
376051008 0.37 R-R R-1 MDR MDR WDC Consistency
376051009 0.37 R-R R-1 MDR MDR WDC Consistency
376051010 0.37 R-R R-1 MDR MDR WDC Consistency
376051011 0.37 R-R R-1 MDR MDR WDC Consistency
376051012 0.18 R-R R-1 MDR MDR WDC Consistency
376051013 0.18 R-R R-1 MDR MDR WDC Consistency
376051014 0.17 R-R R-1 MDR MDR WDC Consistency
3389
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
376052004 0.22 R-R R-1 MDR MDR WDC Consistency
376052005 0.18 R-R R-1 MDR MDR WDC Consistency
376052006 0.18 R-R R-1 MDR MDR WDC Consistency
376052007 0.18 R-R R-1 MDR MDR WDC Consistency
376052008 0.18 R-R R-1 MDR MDR WDC Consistency
376052009 0.18 R-R R-1 MDR MDR WDC Consistency
376052010 0.18 R-R R-1 MDR MDR WDC Consistency
376052011 0.18 R-R R-1 MDR MDR WDC Consistency
376052012 0.18 R-R R-1 MDR MDR WDC Consistency
376053001 0.37 R-R R-1 MDR MDR WDC Consistency
376053002 0.37 R-R R-1 MDR MDR WDC Consistency
376053003 0.18 R-R R-1 MDR MDR WDC Consistency
376053004 0.18 R-R R-1 MDR MDR WDC Consistency
376053005 0.18 R-R R-1 MDR MDR WDC Consistency
376053006 0.18 R-R R-1 MDR MDR WDC Consistency
376053007 0.22 R-R R-1 MDR MDR WDC Consistency
376053008 0.18 R-R R-1 MDR MDR WDC Consistency
376053009 0.18 R-R R-1 MDR MDR WDC Consistency
376053010 0.22 R-R R-1 MDR MDR WDC Consistency
376053011 0.37 R-R R-1 MDR MDR WDC Consistency
376053012 0.37 R-R R-1 MDR MDR WDC Consistency
376053013 0.18 R-R R-1 MDR MDR WDC Consistency
376053014 0.18 R-R R-1 MDR MDR WDC Consistency
376053015 0.18 R-R R-1 MDR MDR WDC Consistency
376053016 0.18 R-R R-1 MDR MDR WDC Consistency
376053017 0.22 R-R R-1 MDR MDR WDC Consistency
376053018 0.40 R-R R-1 MDR MDR WDC Consistency
376053019 0.18 R-R R-1 MDR MDR WDC Consistency
376054001 0.18 R-R R-1 MDR MDR WDC Consistency
376054002 0.18 R-R R-1 MDR MDR WDC Consistency
376054003 0.37 R-R R-1 MDR MDR WDC Consistency
376054004 0.37 R-R R-1 MDR MDR WDC Consistency
376054005 0.37 R-R R-1 MDR MDR WDC Consistency
376054006 0.37 R-R R-1 MDR MDR WDC Consistency
376054007 0.37 R-R R-1 MDR MDR WDC Consistency
376054008 0.20 R-R R-1 MDR MDR WDC Consistency
376054009 0.17 R-R R-1 MDR MDR WDC Consistency
376054010 0.37 R-R R-1 MDR MDR WDC Consistency
376054011 0.37 R-R R-1 MDR MDR WDC Consistency
376054012 0.37 R-R R-1 MDR MDR WDC Consistency
376054013 0.37 R-R R-1 MDR MDR WDC Consistency
376054014 0.37 R-R R-1 MDR MDR WDC Consistency
376101001 0.77 R-R R-1 MDR MDR WDC Consistency
376101002 0.67 R-R R-1 MDR MDR WDC Consistency
376101003 0.66 R-R R-1 MDR MDR WDC Consistency
376101004 0.05 R-R R-1 MDR MDR WDC Consistency
376101005 0.07 R-R R-1 MDR MDR WDC Consistency
376101006 0.18 R-R R-1 MDR MDR WDC Consistency
376101007 0.01 R-R R-1 MDR MDR WDC Consistency
376101008 0.19 R-R R-1 MDR MDR WDC Consistency
376101009 0.19 R-R R-1 MDR MDR WDC Consistency
376101010 0.76 R-R R-1 MDR MDR WDC Consistency
376111001 0.18 R-R R-1 MDR MDR WDC Consistency
3390
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
376111002 0.18 R-R R-1 MDR MDR WDC Consistency
376111003 0.22 R-R R-1 MDR MDR WDC Consistency
376111004 0.22 R-R R-1 MDR MDR WDC Consistency
376111005 0.18 R-R R-1 MDR MDR WDC Consistency
376111006 0.18 R-R R-1 MDR MDR WDC Consistency
376111007 0.18 R-R R-1 MDR MDR WDC Consistency
376111008 0.18 R-R R-1 MDR MDR WDC Consistency
376111009 0.18 R-R R-1 MDR MDR WDC Consistency
376111010 0.18 R-R R-1 MDR MDR WDC Consistency
376111011 0.37 R-R R-1 MDR MDR WDC Consistency
376111012 0.22 R-R R-1 MDR MDR WDC Consistency
376111013 0.18 R-R R-1 MDR MDR WDC Consistency
376111014 0.29 R-R R-1 MDR MDR WDC Consistency
376111015 0.22 R-R R-1 MDR MDR WDC Consistency
376111016 0.09 R-R R-1 MDR MDR WDC Consistency
376111017 0.09 R-R R-1 MDR MDR WDC Consistency
376111018 0.18 R-R R-1 MDR MDR WDC Consistency
376111019 0.18 R-R R-1 MDR MDR WDC Consistency
376111020 0.18 R-R R-1 MDR MDR WDC Consistency
376111022 0.18 R-R R-1 MDR MDR WDC Consistency
376111023 0.19 R-R R-1 MDR MDR WDC Consistency
376111024 0.18 R-R R-1 MDR MDR WDC Consistency
376111025 0.18 R-R R-1 MDR MDR WDC Consistency
376112001 0.18 R-R R-1 MDR MDR WDC Consistency
376112002 0.19 R-R R-1 MDR MDR WDC Consistency
376112003 0.18 R-R R-1 MDR MDR WDC Consistency
376112004 0.18 R-R R-1 MDR MDR WDC Consistency
376112005 0.18 R-R R-1 MDR MDR WDC Consistency
376112006 0.18 R-R R-1 MDR MDR WDC Consistency
376112007 0.18 R-R R-1 MDR MDR WDC Consistency
376112008 0.18 R-R R-1 MDR MDR WDC Consistency
376112009 0.18 R-R R-1 MDR MDR WDC Consistency
376112010 0.18 R-R R-1 MDR MDR WDC Consistency
376112011 0.18 R-R R-1 MDR MDR WDC Consistency
376112012 0.18 R-R R-1 MDR MDR WDC Consistency
376112013 0.18 R-R R-1 MDR MDR WDC Consistency
376112014 0.19 R-R R-1 MDR MDR WDC Consistency
376112015 0.18 R-R R-1 MDR MDR WDC Consistency
376112016 0.18 R-R R-1 MDR MDR WDC Consistency
376112017 0.18 R-R R-1 MDR MDR WDC Consistency
376112018 0.18 R-R R-1 MDR MDR WDC Consistency
376112019 0.18 R-R R-1 MDR MDR WDC Consistency
376112021 0.18 R-R R-1 MDR MDR WDC Consistency
376112022 0.18 R-R R-1 MDR MDR WDC Consistency
376112023 0.18 R-R R-1 MDR MDR WDC Consistency
376112024 0.18 R-R R-1 MDR MDR WDC Consistency
376113001 0.29 R-R R-1 MDR MDR WDC Consistency
376113002 0.18 R-R R-1 MDR MDR WDC Consistency
376113003 0.22 R-R R-1 MDR MDR WDC Consistency
376113004 0.22 R-R R-1 MDR MDR WDC Consistency
376113005 0.18 R-R R-1 MDR MDR WDC Consistency
376113006 0.18 R-R R-1 MDR MDR WDC Consistency
376113007 0.37 R-R R-1 MDR MDR WDC Consistency
3391
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
376113008 0.18 R-R R-1 MDR MDR WDC Consistency
376113009 0.18 R-R R-1 MDR MDR WDC Consistency
376113010 0.18 R-R R-1 MDR MDR WDC Consistency
376113011 0.29 R-R R-1 MDR MDR WDC Consistency
376113013 0.22 R-R R-1 MDR MDR WDC Consistency
376113014 0.37 R-R R-1 MDR MDR WDC Consistency
376113015 0.18 R-R R-1 MDR MDR WDC Consistency
376113016 0.18 R-R R-1 MDR MDR WDC Consistency
376113017 0.18 R-R R-1 MDR MDR WDC Consistency
376113018 0.18 R-R R-1 MDR MDR WDC Consistency
376113019 0.18 R-R R-1 MDR MDR WDC Consistency
376113020 0.29 R-R R-1 MDR MDR WDC Consistency
376113021 0.59 R-R R-1 MDR MDR WDC Consistency
376114001 0.29 R-R R-1 MDR MDR WDC Consistency
376114002 0.19 R-R R-1 MDR MDR WDC Consistency
376114003 0.18 R-R R-1 MDR MDR WDC Consistency
376114004 0.18 R-R R-1 MDR MDR WDC Consistency
376114005 0.18 R-R R-1 MDR MDR WDC Consistency
376114006 0.19 R-R R-1 MDR MDR WDC Consistency
376114007 0.18 R-R R-1 MDR MDR WDC Consistency
376114008 0.18 R-R R-1 MDR MDR WDC Consistency
376114009 0.18 R-R R-1 MDR MDR WDC Consistency
376114010 0.18 R-R R-1 MDR MDR WDC Consistency
376114011 0.18 R-R R-1 MDR MDR WDC Consistency
376114012 0.18 R-R R-1 MDR MDR WDC Consistency
376114013 0.29 R-R R-1 MDR MDR WDC Consistency
376114014 0.19 R-R R-1 MDR MDR WDC Consistency
376114015 0.18 R-R R-1 MDR MDR WDC Consistency
376114016 0.18 R-R R-1 MDR MDR WDC Consistency
376114017 0.18 R-R R-1 MDR MDR WDC Consistency
376114018 0.19 R-R R-1 MDR MDR WDC Consistency
376114019 0.18 R-R R-1 MDR MDR WDC Consistency
376114020 0.18 R-R R-1 MDR MDR WDC Consistency
376114021 0.18 R-R R-1 MDR MDR WDC Consistency
376114022 0.18 R-R R-1 MDR MDR WDC Consistency
376114023 0.18 R-R R-1 MDR MDR WDC Consistency
376114024 0.18 R-R R-1 MDR MDR WDC Consistency
376121001 0.19 R-R R-1 MDR MDR WDC Consistency
376121002 0.18 R-R R-1 MDR MDR WDC Consistency
376121003 0.44 R-R R-1 MDR MDR WDC Consistency
376121004 0.18 R-R R-1 MDR MDR WDC Consistency
376121005 0.18 R-R R-1 MDR MDR WDC Consistency
376121006 0.22 R-R R-1 MDR MDR WDC Consistency
376121007 0.19 R-R R-1 MDR MDR WDC Consistency
376121008 0.19 R-R R-1 MDR MDR WDC Consistency
376121009 0.19 R-R R-1 MDR MDR WDC Consistency
376121010 0.19 R-R R-1 MDR MDR WDC Consistency
376121011 0.19 R-R R-1 MDR MDR WDC Consistency
376121012 0.19 R-R R-1 MDR MDR WDC Consistency
376121013 0.19 R-R R-1 MDR MDR WDC Consistency
376121014 0.19 R-R R-1 MDR MDR WDC Consistency
376121015 0.22 R-R R-1 MDR MDR WDC Consistency
376121016 0.18 R-R R-1 MDR MDR WDC Consistency
3392
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
376121017 0.18 R-R R-1 MDR MDR WDC Consistency
376121018 0.18 R-R R-1 MDR MDR WDC Consistency
376121019 0.18 R-R R-1 MDR MDR WDC Consistency
376121020 0.18 R-R R-1 MDR MDR WDC Consistency
376121021 0.18 R-R R-1 MDR MDR WDC Consistency
376121022 0.20 R-R R-1 MDR MDR WDC Consistency
376121023 0.18 R-R R-1 MDR MDR WDC Consistency
376122001 0.38 R-R R-1 MDR MDR WDC Consistency
376122002 0.19 R-R R-1 MDR MDR WDC Consistency
376122003 0.19 R-R R-1 MDR MDR WDC Consistency
376122004 0.19 R-R R-1 MDR MDR WDC Consistency
376122005 0.19 R-R R-1 MDR MDR WDC Consistency
376122006 0.37 R-R R-1 MDR MDR WDC Consistency
376122007 0.19 R-R R-1 MDR MDR WDC Consistency
376122008 0.19 R-R R-1 MDR MDR WDC Consistency
376122009 0.19 R-R R-1 MDR MDR WDC Consistency
376122010 0.19 R-R R-1 MDR MDR WDC Consistency
376122011 0.18 R-R R-1 MDR MDR WDC Consistency
376122012 0.19 R-R R-1 MDR MDR WDC Consistency
376122013 0.18 R-R R-1 MDR MDR WDC Consistency
376122014 0.18 R-R R-1 MDR MDR WDC Consistency
376122015 0.18 R-R R-1 MDR MDR WDC Consistency
376122016 0.18 R-R R-1 MDR MDR WDC Consistency
376122017 0.18 R-R R-1 MDR MDR WDC Consistency
376122018 0.18 R-R R-1 MDR MDR WDC Consistency
376122019 0.18 R-R R-1 MDR MDR WDC Consistency
376122020 0.18 R-R R-1 MDR MDR WDC Consistency
376122021 0.18 R-R R-1 MDR MDR WDC Consistency
376122022 0.18 R-R R-1 MDR MDR WDC Consistency
376131001 0.18 R-R R-1 MDR MDR WDC Consistency
376131002 0.18 R-R R-1 MDR MDR WDC Consistency
376131003 0.18 R-R R-1 MDR MDR WDC Consistency
376131004 0.29 R-R R-1 MDR MDR WDC Consistency
376131005 0.16 R-R R-1 MDR MDR WDC Consistency
376131006 0.13 R-R R-1 MDR MDR WDC Consistency
376131007 0.13 R-R R-1 MDR MDR WDC Consistency
376131008 0.26 R-R R-1 MDR MDR WDC Consistency
376131009 0.26 R-R R-1 MDR MDR WDC Consistency
376131010 0.28 R-R R-1 MDR MDR WDC Consistency
376131011 0.31 R-R R-1 MDR MDR WDC Consistency
376131012 0.15 R-R R-1 MDR MDR WDC Consistency
376131013 0.15 R-R R-1 MDR MDR WDC Consistency
376131014 0.15 R-R R-1 MDR MDR WDC Consistency
376131015 0.16 R-R R-1 MDR MDR WDC Consistency
376131016 0.16 R-R R-1 MDR MDR WDC Consistency
376131019 0.35 R-R R-1 MDR MDR WDC Consistency
376132004 0.34 R-R R-1 MDR MDR WDC Consistency
376132005 0.18 R-R R-1 MDR MDR WDC Consistency
376132006 0.19 R-R R-1 MDR MDR WDC Consistency
376132007 0.15 R-R R-1 MDR MDR WDC Consistency
376132008 0.15 R-R R-1 MDR MDR WDC Consistency
376132009 0.14 R-R R-1 MDR MDR WDC Consistency
376132010 0.14 R-R R-1 MDR MDR WDC Consistency
3393
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
376132011 0.14 R-R R-1 MDR MDR WDC Consistency
376132014 0.75 R-R R-1 MDR MDR WDC Consistency
376132015 0.91 R-R R-1 MDR MDR WDC Consistency
376132017 0.22 R-R R-1 MDR MDR WDC Consistency
376132018 0.22 R-R R-1 MDR MDR WDC Consistency
376132020 0.21 R-R R-1 MDR MDR WDC Consistency
376132021 0.21 R-R R-1 MDR MDR WDC Consistency
376132023 0.19 R-R R-1 MDR MDR WDC Consistency
376132024 0.32 R-R R-1 MDR MDR WDC Consistency
376132025 0.20 R-R R-1 MDR MDR WDC Consistency
376132026 0.20 R-R R-1 MDR MDR WDC Consistency
376132027 0.36 R-R R-1 MDR MDR WDC Consistency
376132028 0.22 R-R R-1 MDR MDR WDC Consistency
376132029 2.12 R-R R-1 MDR MDR WDC Consistency
376132030 1.04 R-R R-1 MDR MDR WDC Consistency
376132031 0.22 R-R R-1 MDR MDR WDC Consistency
376132032 0.21 R-R R-1 MDR MDR WDC Consistency
376132033 0.21 R-R R-1 MDR MDR WDC Consistency
376132034 0.26 R-R R-1 MDR MDR WDC Consistency
376150009 0.65 R-R R-1 MDR MDR WDC Consistency
376150012 0.65 R-R R-1 MDR MDR WDC Consistency
376150014 0.65 R-R R-1 MDR MDR WDC Consistency
376150015 0.69 R-R R-1 MDR MDR WDC Consistency
376150016 4.84 R-R R-1 MDR MDR WDC Consistency
376160002 0.52 R-R R-1 MDR MDR WDC Consistency
376160003 0.33 R-R R-1 MDR MDR WDC Consistency
376160004 0.43 R-R R-1 MDR MDR WDC Consistency
376160007 0.64 R-R R-1 MDR MDR WDC Consistency
376160011 0.64 R-R R-1 MDR MDR WDC Consistency
376160012 0.40 R-R R-1 MDR MDR WDC Consistency
376160013 0.40 R-R R-1 MDR MDR WDC Consistency
376160014 0.53 R-R R-1 MDR MDR WDC Consistency
376160016 0.64 R-R R-1 MDR MDR WDC Consistency
376160017 0.40 R-R R-1 MDR MDR WDC Consistency
376160018 0.40 R-R R-1 MDR MDR WDC Consistency
376160019 0.53 R-R R-1 MDR MDR WDC Consistency
376160023 0.33 R-R R-1 MDR MDR WDC Consistency
376160024 0.40 R-R R-1 MDR MDR WDC Consistency
376160025 0.40 R-R R-1 MDR MDR WDC Consistency
376160026 0.53 R-R R-1 MDR MDR WDC Consistency
376170001 1.05 R-R R-1 MDR MDR WDC Consistency
376170003 0.67 R-R R-1 MDR MDR WDC Consistency
376170004 0.49 R-R R-1 MDR MDR WDC Consistency
376170005 0.48 R-R R-1 MDR MDR WDC Consistency
376170006 0.40 R-R R-1 MDR MDR WDC Consistency
376170007 0.50 R-R R-1 MDR MDR WDC Consistency
376170008 0.50 R-R R-1 MDR MDR WDC Consistency
376170009 0.50 R-R R-1 MDR MDR WDC Consistency
376170010 0.42 R-R R-1 MDR MDR WDC Consistency
376170011 0.60 R-R R-1 MDR MDR WDC Consistency
376170012 1.02 R-R R-1 MDR MDR WDC Consistency
376170013 2.05 R-R R-1 MDR MDR WDC Consistency
376330003 1.34 R-R R-1 MDR MDR WDC Consistency
3394
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
376330017 3.11 R-R R-1 MDR MDR WDC Consistency
376350005 1.85 R-R R-1 MDR MDR WDC Consistency
376350007 2.52 R-R R-1 MDR MDR WDC Consistency
376350009 20.07 R-R R-1 MDR MDR WDC Consistency
376350010 3.36 R-R R-1 MDR MDR WDC Consistency
376350017 7.09 R-R R-1 MDR MDR WDC Consistency
376350019 2.79 R-R R-1 MDR MDR WDC Consistency
376410026 9.09 R-R R-1 MDR MDR WDC Consistency
380040003 2.92 R-R R-1 MDR MDR WDC Consistency
380040004 4.80 R-R R-1 MDR MDR WDC Consistency
380040006 0.93 R-R R-1 MDR MDR WDC Consistency
380040010 0.21 R-R R-1 MDR MDR WDC Consistency
380040015 0.47 R-R R-1 MDR MDR WDC Consistency
380040016 0.17 R-R R-1 MDR MDR WDC Consistency
380040017 0.46 R-R R-1 MDR MDR WDC Consistency
380040018 0.04 R-R R-1 MDR MDR WDC Consistency
380040019 0.01 R-R R-1 MDR MDR WDC Consistency
380040020 0.52 R-R R-1 MDR MDR WDC Consistency
380040021 0.52 R-R R-1 MDR MDR WDC Consistency
380040028 3.00 R-R R-1 MDR MDR WDC Consistency
380050003 12.37 R-R R-1 MDR MDR WDC Consistency
380050004 2.35 R-R R-1 MDR MDR WDC Consistency
380050007 0.78 R-R R-1 MDR MDR WDC Consistency
380050008 0.14 R-R R-1 MDR MDR WDC Consistency
380050012 2.77 R-R R-1 MDR MDR WDC Consistency
380050015 2.49 R-R R-1 MDR MDR WDC Consistency
380050016 5.65 R-R R-1 MDR MDR WDC Consistency
380050017 1.40 R-R R-1 MDR MDR WDC Consistency
380050018 1.06 R-R R-1 MDR MDR WDC Consistency
380050019 1.06 R-R R-1 MDR MDR WDC Consistency
380050020 1.06 R-R R-1 MDR MDR WDC Consistency
380050021 3.17 R-R R-1 MDR MDR WDC Consistency
380050023 4.54 R-R R-1 MDR MDR WDC Consistency
380050024 3.13 R-R R-1 MDR MDR WDC Consistency
380050027 6.19 R-R R-1 MDR MDR WDC Consistency
380050028 2.95 R-R R-1 MDR MDR WDC Consistency
380080018 7.26 R-R R-1 MDR MDR WDC Consistency
380080019 1.71 R-R R-1 MDR MDR WDC Consistency
380100007 3.58 R-R R-1 MDR MDR WDC Consistency
380100013 2.32 R-R R-1 MDR MDR WDC Consistency
380120014 2.14 R-R R-1 MDR MDR WDC Consistency
380120015 1.26 R-R R-1 MDR MDR WDC Consistency
380120016 1.67 R-R R-1 MDR MDR WDC Consistency
380120017 1.09 R-R R-1 MDR MDR WDC Consistency
380120018 1.03 R-R R-1 MDR MDR WDC Consistency
380120019 2.00 R-R R-1 MDR MDR WDC Consistency
380120020 1.07 R-R R-1 MDR MDR WDC Consistency
380120021 1.22 R-R R-1 MDR MDR WDC Consistency
380120022 0.85 R-R R-1 MDR MDR WDC Consistency
380120023 1.12 R-R R-1 MDR MDR WDC Consistency
380120024 0.98 R-R R-1 MDR MDR WDC Consistency
380120025 0.29 R-R R-1 MDR MDR WDC Consistency
380130004 3.64 R-R R-1 MDR MDR WDC Consistency
3395
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
380130007 2.21 R-R R-1 MDR MDR WDC Consistency
380130008 2.02 R-R R-1 MDR MDR WDC Consistency
380130009 2.00 R-R R-1 MDR MDR WDC Consistency
380200001 7.23 R-R R-1 MDR MDR WDC Consistency
380200002 3.20 R-R R-1 MDR MDR WDC Consistency
380200003 0.41 R-R R-1 MDR MDR WDC Consistency
380200004 0.25 R-R R-1 MDR MDR WDC Consistency
380200005 0.25 R-R R-1 MDR MDR WDC Consistency
380200006 0.37 R-R R-1 MDR MDR WDC Consistency
380200007 1.23 R-R R-1 MDR MDR WDC Consistency
380200008 1.94 R-R R-1 MDR MDR WDC Consistency
380210006 4.96 R-R R-1 MDR MDR WDC Consistency
380210014 16.22 R-R R-1 MDR MDR WDC Consistency
380330001 0.23 R-R R-1 MDR MDR WDC Consistency
380330002 0.18 R-R R-1 MDR MDR WDC Consistency
380330003 0.18 R-R R-1 MDR MDR WDC Consistency
380330004 0.17 R-R R-1 MDR MDR WDC Consistency
380330005 0.17 R-R R-1 MDR MDR WDC Consistency
380330006 0.18 R-R R-1 MDR MDR WDC Consistency
380330007 0.18 R-R R-1 MDR MDR WDC Consistency
380330008 0.18 R-R R-1 MDR MDR WDC Consistency
380330009 0.17 R-R R-1 MDR MDR WDC Consistency
380330010 0.18 R-R R-1 MDR MDR WDC Consistency
380330011 0.17 R-R R-1 MDR MDR WDC Consistency
380330012 0.23 R-R R-1 MDR MDR WDC Consistency
380330013 0.24 R-R R-1 MDR MDR WDC Consistency
380330014 0.18 R-R R-1 MDR MDR WDC Consistency
380330015 0.17 R-R R-1 MDR MDR WDC Consistency
380330016 0.17 R-R R-1 MDR MDR WDC Consistency
380330017 0.17 R-R R-1 MDR MDR WDC Consistency
380330018 0.17 R-R R-1 MDR MDR WDC Consistency
380330019 0.17 R-R R-1 MDR MDR WDC Consistency
380330020 0.20 R-R R-1 MDR MDR WDC Consistency
380330021 0.21 R-R R-1 MDR MDR WDC Consistency
380330022 0.25 R-R R-1 MDR MDR WDC Consistency
380330023 0.25 R-R R-1 MDR MDR WDC Consistency
380330024 0.18 R-R R-1 MDR MDR WDC Consistency
380330025 0.17 R-R R-1 MDR MDR WDC Consistency
380330026 0.17 R-R R-1 MDR MDR WDC Consistency
380330027 0.17 R-R R-1 MDR MDR WDC Consistency
380330028 0.17 R-R R-1 MDR MDR WDC Consistency
380330029 0.17 R-R R-1 MDR MDR WDC Consistency
380330030 0.17 R-R R-1 MDR MDR WDC Consistency
380330031 0.17 R-R R-1 MDR MDR WDC Consistency
380330032 0.18 R-R R-1 MDR MDR WDC Consistency
380330033 0.17 R-R R-1 MDR MDR WDC Consistency
380330034 0.18 R-R R-1 MDR MDR WDC Consistency
380330035 0.20 R-R R-1 MDR MDR WDC Consistency
380330036 0.24 R-R R-1 MDR MDR WDC Consistency
380330037 0.18 R-R R-1 MDR MDR WDC Consistency
380330038 0.22 R-R R-1 MDR MDR WDC Consistency
380330039 0.23 R-R R-1 MDR MDR WDC Consistency
380330040 0.43 R-R R-1 MDR MDR WDC Consistency
3396
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
380330041 0.39 R-R R-1 MDR MDR WDC Consistency
380330042 0.32 R-R R-1 MDR MDR WDC Consistency
380330043 0.23 R-R R-1 MDR MDR WDC Consistency
380330044 0.36 R-R R-1 MDR MDR WDC Consistency
380330045 0.38 R-R R-1 MDR MDR WDC Consistency
380330046 0.36 R-R R-1 MDR MDR WDC Consistency
380330048 0.32 R-R R-1 MDR MDR WDC Consistency
380470041 2.37 R-R R-1 MDR MDR WDC Consistency
380470042 0.50 R-R R-1 MDR MDR WDC Consistency
382242027 0.17 R-R R-1 MDR MDR WDC Consistency
382242028 0.17 R-R R-1 MDR MDR WDC Consistency
382242029 0.18 R-R R-1 MDR MDR WDC Consistency
382242030 0.17 R-R R-1 MDR MDR WDC Consistency
382242031 0.17 R-R R-1 MDR MDR WDC Consistency
382242032 0.17 R-R R-1 MDR MDR WDC Consistency
382242033 0.16 R-R R-1 MDR MDR WDC Consistency
382242034 0.16 R-R R-1 MDR MDR WDC Consistency
382242035 0.16 R-R R-1 MDR MDR WDC Consistency
382242036 0.16 R-R R-1 MDR MDR WDC Consistency
382242037 0.16 R-R R-1 MDR MDR WDC Consistency
382242038 0.16 R-R R-1 MDR MDR WDC Consistency
382243001 0.18 R-R R-1 MDR MDR WDC Consistency
382243002 0.18 R-R R-1 MDR MDR WDC Consistency
382243003 0.18 R-R R-1 MDR MDR WDC Consistency
382243004 0.18 R-R R-1 MDR MDR WDC Consistency
382243005 0.18 R-R R-1 MDR MDR WDC Consistency
382243006 0.18 R-R R-1 MDR MDR WDC Consistency
382243007 0.18 R-R R-1 MDR MDR WDC Consistency
382243008 0.18 R-R R-1 MDR MDR WDC Consistency
382243009 0.18 R-R R-1 MDR MDR WDC Consistency
382243010 0.18 R-R R-1 MDR MDR WDC Consistency
382243011 0.18 R-R R-1 MDR MDR WDC Consistency
382243012 0.18 R-R R-1 MDR MDR WDC Consistency
382243013 0.18 R-R R-1 MDR MDR WDC Consistency
382243014 0.18 R-R R-1 MDR MDR WDC Consistency
382243015 0.18 R-R R-1 MDR MDR WDC Consistency
382243016 0.18 R-R R-1 MDR MDR WDC Consistency
382243017 0.18 R-R R-1 MDR MDR WDC Consistency
382243018 0.18 R-R R-1 MDR MDR WDC Consistency
382243019 0.18 R-R R-1 MDR MDR WDC Consistency
382243020 0.18 R-R R-1 MDR MDR WDC Consistency
382243021 0.18 R-R R-1 MDR MDR WDC Consistency
382243022 0.18 R-R R-1 MDR MDR WDC Consistency
382243023 0.18 R-R R-1 MDR MDR WDC Consistency
382243024 0.19 R-R R-1 MDR MDR WDC Consistency
380160017 1.34 W-1 R-1 MDR MDR WDC Consistency
367110008 9.56 R-3 R-1 MHDR MHDR WDC Consistency
367502002 6.46 C-O R-2 HDR HDR WDC Consistency
367502003 1.78 C-O R-2 HDR HDR WDC Consistency
367502004 0.49 C-O R-2 HDR HDR WDC Consistency
367180051 0.31 C-P-S R-2 MHDR MHDR WDC Consistency
367110035 8.47 R-3 R-2 MHDR MHDR WDC Consistency
380220003 25.78 R-3 R-2 MHDR MHDR WDC Consistency
3397
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
380280001 2.07 R-3 R-2 MHDR MHDR WDC Consistency
380280002 4.33 R-3 R-2 MHDR MHDR WDC Consistency
380280003 2.22 R-3 R-2 MHDR MHDR WDC Consistency
380280019 2.02 R-3 R-2 MHDR MHDR WDC Consistency
380290004 4.62 R-3 R-2 MHDR MHDR WDC Consistency
380290005 2.45 R-3 R-2 MHDR MHDR WDC Consistency
380290006 2.41 R-3 R-2 MHDR MHDR WDC Consistency
380290014 2.13 R-3 R-2 MHDR MHDR WDC Consistency
380290015 2.41 R-3 R-2 MHDR MHDR WDC Consistency
380290016 1.90 R-3 R-2 MHDR MHDR WDC Consistency
380290017 2.53 R-3 R-2 MHDR MHDR WDC Consistency
380290018 4.45 R-3 R-2 MHDR MHDR WDC Consistency
380290025 2.34 R-3 R-2 MHDR MHDR WDC Consistency
380290026 2.63 R-3 R-2 MHDR MHDR WDC Consistency
380290027 0.74 R-3 R-2 MHDR MHDR WDC Consistency
362070003 0.93 R-4 R-2 MHDR MHDR WDC Consistency
362070006 0.40 R-4 R-2 MHDR MHDR WDC Consistency
362070021 0.76 R-4 R-2 MHDR MHDR WDC Consistency
362070022 0.15 R-4 R-2 MHDR MHDR WDC Consistency
362070026 0.21 R-4 R-2 MHDR MHDR WDC Consistency
362070028 4.89 R-4 R-2 MHDR MHDR WDC Consistency
362070030 8.59 R-4 R-2 MHDR MHDR WDC Consistency
362080007 1.13 R-4 R-2 MHDR MHDR WDC Consistency
362080021 32.66 R-4 R-2 MHDR MHDR WDC Consistency
362080022 13.22 R-4 R-2 MHDR MHDR WDC Consistency
362250001 5.82 R-4 R-2 MHDR MHDR WDC Consistency
362250026 5.39 R-4 R-2 MHDR MHDR WDC Consistency
367180068 14.74 R-4 R-2 MHDR MHDR WDC Consistency
380280013 0.02 R-4 R-2 MHDR MHDR WDC Consistency
380450001 0.17 R-4 R-2 MHDR MHDR WDC Consistency
380450002 0.17 R-4 R-2 MHDR MHDR WDC Consistency
380450003 0.15 R-4 R-2 MHDR MHDR WDC Consistency
380450004 0.20 R-4 R-2 MHDR MHDR WDC Consistency
380450005 0.20 R-4 R-2 MHDR MHDR WDC Consistency
380450006 0.16 R-4 R-2 MHDR MHDR WDC Consistency
380450007 0.16 R-4 R-2 MHDR MHDR WDC Consistency
380450008 0.17 R-4 R-2 MHDR MHDR WDC Consistency
380450009 0.18 R-4 R-2 MHDR MHDR WDC Consistency
380450010 0.15 R-4 R-2 MHDR MHDR WDC Consistency
380450011 0.14 R-4 R-2 MHDR MHDR WDC Consistency
380450012 0.17 R-4 R-2 MHDR MHDR WDC Consistency
380451001 0.18 R-4 R-2 MHDR MHDR WDC Consistency
380451002 0.16 R-4 R-2 MHDR MHDR WDC Consistency
380451003 0.16 R-4 R-2 MHDR MHDR WDC Consistency
380451004 0.19 R-4 R-2 MHDR MHDR WDC Consistency
380451005 0.16 R-4 R-2 MHDR MHDR WDC Consistency
380451006 0.13 R-4 R-2 MHDR MHDR WDC Consistency
380452001 0.19 R-4 R-2 MHDR MHDR WDC Consistency
380452002 0.20 R-4 R-2 MHDR MHDR WDC Consistency
380452003 0.19 R-4 R-2 MHDR MHDR WDC Consistency
380452004 0.21 R-4 R-2 MHDR MHDR WDC Consistency
380452005 0.88 R-4 R-2 MHDR MHDR WDC Consistency
380460001 0.13 R-4 R-2 MHDR MHDR WDC Consistency
3398
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
380460002 0.13 R-4 R-2 MHDR MHDR WDC Consistency
380460003 0.15 R-4 R-2 MHDR MHDR WDC Consistency
380460004 0.16 R-4 R-2 MHDR MHDR WDC Consistency
380460005 0.15 R-4 R-2 MHDR MHDR WDC Consistency
380460006 0.15 R-4 R-2 MHDR MHDR WDC Consistency
380460007 0.17 R-4 R-2 MHDR MHDR WDC Consistency
380460008 0.31 R-4 R-2 MHDR MHDR WDC Consistency
380460009 0.43 R-4 R-2 MHDR MHDR WDC Consistency
380460010 0.24 R-4 R-2 MHDR MHDR WDC Consistency
380460011 0.22 R-4 R-2 MHDR MHDR WDC Consistency
380460012 0.17 R-4 R-2 MHDR MHDR WDC Consistency
380460013 0.15 R-4 R-2 MHDR MHDR WDC Consistency
380460014 0.14 R-4 R-2 MHDR MHDR WDC Consistency
380460015 0.12 R-4 R-2 MHDR MHDR WDC Consistency
380460016 0.12 R-4 R-2 MHDR MHDR WDC Consistency
380460017 0.12 R-4 R-2 MHDR MHDR WDC Consistency
380460018 0.13 R-4 R-2 MHDR MHDR WDC Consistency
380460019 0.15 R-4 R-2 MHDR MHDR WDC Consistency
380460020 0.16 R-4 R-2 MHDR MHDR WDC Consistency
380460021 0.24 R-4 R-2 MHDR MHDR WDC Consistency
380460022 0.24 R-4 R-2 MHDR MHDR WDC Consistency
380460023 0.15 R-4 R-2 MHDR MHDR WDC Consistency
380460024 0.12 R-4 R-2 MHDR MHDR WDC Consistency
380460025 0.12 R-4 R-2 MHDR MHDR WDC Consistency
380460026 0.12 R-4 R-2 MHDR MHDR WDC Consistency
380460027 0.18 R-4 R-2 MHDR MHDR WDC Consistency
380460028 0.33 R-4 R-2 MHDR MHDR WDC Consistency
380460029 0.14 R-4 R-2 MHDR MHDR WDC Consistency
380460030 0.14 R-4 R-2 MHDR MHDR WDC Consistency
380460031 0.14 R-4 R-2 MHDR MHDR WDC Consistency
380460032 0.15 R-4 R-2 MHDR MHDR WDC Consistency
380460033 0.17 R-4 R-2 MHDR MHDR WDC Consistency
380460034 0.16 R-4 R-2 MHDR MHDR WDC Consistency
380460035 0.16 R-4 R-2 MHDR MHDR WDC Consistency
380460036 0.16 R-4 R-2 MHDR MHDR WDC Consistency
380460037 0.12 R-4 R-2 MHDR MHDR WDC Consistency
380460038 0.14 R-4 R-2 MHDR MHDR WDC Consistency
380460039 0.15 R-4 R-2 MHDR MHDR WDC Consistency
380460040 0.23 R-4 R-2 MHDR MHDR WDC Consistency
380460041 0.18 R-4 R-2 MHDR MHDR WDC Consistency
380460042 0.15 R-4 R-2 MHDR MHDR WDC Consistency
380460043 0.19 R-4 R-2 MHDR MHDR WDC Consistency
380460044 0.15 R-4 R-2 MHDR MHDR WDC Consistency
380460045 0.18 R-4 R-2 MHDR MHDR WDC Consistency
380460046 1.12 R-4 R-2 MHDR MHDR WDC Consistency
380460047 0.77 R-4 R-2 MHDR MHDR WDC Consistency
380460048 0.07 R-4 R-2 MHDR MHDR WDC Consistency
380460049 5.50 R-4 R-2 MHDR MHDR WDC Consistency
365082024 4.11 R-R R-2 MHDR MHDR WDC Consistency
365161005 0.15 R-R R-2 MHDR MHDR WDC Consistency
365180004 8.94 R-R R-2 MHDR MHDR WDC Consistency
366024010 1.49 R-R R-2 MHDR MHDR WDC Consistency
366033016 0.72 R-R R-2 MHDR MHDR WDC Consistency
3399
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
366130007 0.39 R-R R-2 MHDR MHDR WDC Consistency
366130008 0.20 R-R R-2 MHDR MHDR WDC Consistency
366130009 0.20 R-R R-2 MHDR MHDR WDC Consistency
366130010 0.20 R-R R-2 MHDR MHDR WDC Consistency
366130011 0.19 R-R R-2 MHDR MHDR WDC Consistency
366130012 0.38 R-R R-2 MHDR MHDR WDC Consistency
366130013 0.20 R-R R-2 MHDR MHDR WDC Consistency
366130014 0.20 R-R R-2 MHDR MHDR WDC Consistency
366130015 0.20 R-R R-2 MHDR MHDR WDC Consistency
366130016 0.20 R-R R-2 MHDR MHDR WDC Consistency
366130017 0.70 R-R R-2 MHDR MHDR WDC Consistency
366130029 0.76 R-R R-2 MHDR MHDR WDC Consistency
366130032 0.96 R-R R-2 MHDR MHDR WDC Consistency
366130035 1.50 R-R R-2 MHDR MHDR WDC Consistency
366130036 1.56 R-R R-2 MHDR MHDR WDC Consistency
366130037 0.63 R-R R-2 MHDR MHDR WDC Consistency
366130041 0.77 R-R R-2 MHDR MHDR WDC Consistency
366130042 0.00 R-R R-2 MHDR MHDR WDC Consistency
366130043 0.09 R-R R-2 MHDR MHDR WDC Consistency
366130044 0.06 R-R R-2 MHDR MHDR WDC Consistency
366130045 0.89 R-R R-2 MHDR MHDR WDC Consistency
366140005 9.27 R-R R-2 MHDR MHDR WDC Consistency
366140006 0.34 R-R R-2 MHDR MHDR WDC Consistency
366150005 0.37 R-R R-2 MHDR MHDR WDC Consistency
366150006 0.19 R-R R-2 MHDR MHDR WDC Consistency
366150007 0.19 R-R R-2 MHDR MHDR WDC Consistency
366150008 0.19 R-R R-2 MHDR MHDR WDC Consistency
366150009 0.18 R-R R-2 MHDR MHDR WDC Consistency
366150010 0.19 R-R R-2 MHDR MHDR WDC Consistency
366150011 0.19 R-R R-2 MHDR MHDR WDC Consistency
366150012 0.50 R-R R-2 MHDR MHDR WDC Consistency
366150013 0.26 R-R R-2 MHDR MHDR WDC Consistency
366150014 0.26 R-R R-2 MHDR MHDR WDC Consistency
366150015 0.19 R-R R-2 MHDR MHDR WDC Consistency
366150016 0.19 R-R R-2 MHDR MHDR WDC Consistency
366150017 0.19 R-R R-2 MHDR MHDR WDC Consistency
366150018 0.19 R-R R-2 MHDR MHDR WDC Consistency
366150019 0.19 R-R R-2 MHDR MHDR WDC Consistency
366150020 0.19 R-R R-2 MHDR MHDR WDC Consistency
366150021 0.21 R-R R-2 MHDR MHDR WDC Consistency
366150022 0.17 R-R R-2 MHDR MHDR WDC Consistency
366150024 0.01 R-R R-2 MHDR MHDR WDC Consistency
366170022 0.59 R-R R-2 MHDR MHDR WDC Consistency
366170023 0.58 R-R R-2 MHDR MHDR WDC Consistency
366170024 0.60 R-R R-2 MHDR MHDR WDC Consistency
366170025 0.57 R-R R-2 MHDR MHDR WDC Consistency
366170027 0.56 R-R R-2 MHDR MHDR WDC Consistency
366170029 0.86 R-R R-2 MHDR MHDR WDC Consistency
366170031 0.86 R-R R-2 MHDR MHDR WDC Consistency
366170032 0.57 R-R R-2 MHDR MHDR WDC Consistency
366170033 0.59 R-R R-2 MHDR MHDR WDC Consistency
366170035 0.56 R-R R-2 MHDR MHDR WDC Consistency
366170036 0.58 R-R R-2 MHDR MHDR WDC Consistency
3400
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
366170037 0.57 R-R R-2 MHDR MHDR WDC Consistency
366170038 0.57 R-R R-2 MHDR MHDR WDC Consistency
366170039 0.56 R-R R-2 MHDR MHDR WDC Consistency
366170040 0.56 R-R R-2 MHDR MHDR WDC Consistency
366170041 0.56 R-R R-2 MHDR MHDR WDC Consistency
376060005 1.01 R-R R-2 MHDR MHDR WDC Consistency
376060006 1.10 R-R R-2 MHDR MHDR WDC Consistency
376060022 1.89 R-R R-2 MHDR MHDR WDC Consistency
376060028 3.68 R-R R-2 MHDR MHDR WDC Consistency
376060029 1.89 R-R R-2 MHDR MHDR WDC Consistency
380160002 5.33 R-R R-2 VLDR MHDR WDC Consistency
380170003 1.27 R-R R-2 MHDR MHDR WDC Consistency
380170004 1.12 R-R R-2 MHDR MHDR WDC Consistency
380170005 4.44 R-R R-2 MHDR MHDR WDC Consistency
380170012 1.22 R-R R-2 MHDR MHDR WDC Consistency
366330009 8.17 R-T R-2 MHDR MHDR WDC Consistency
380250038 12.37 SP ZONE R-2 MHDR MHDR WDC Consistency
376410025 7.02 C-P-S R-3 VHDR VHDR WDC Consistency
367180069 11.59 R-4 R-3 VHDR VHDR WDC Consistency
365062011 0.80 R-R R-3 VHDR VHDR WDC Consistency
365093001 0.09 R-R R-3 VHDR VHDR WDC Consistency
365113013 0.13 R-R R-3 VHDR VHDR WDC Consistency
365113014 0.15 R-R R-3 VHDR VHDR WDC Consistency
380250035 20.77 SP ZONE R-3 VHDR VHDR WDC Consistency
380250037 1.07 SP ZONE R-3 VHDR VHDR WDC Consistency
380250044 9.01 R-3 R-4 HHDR HHDR WDC Consistency
382320017 439.80 R-R R-M RM MDR WDC Consistency
365250038 10.22 R-1 R-M RM RM WDC Consistency
361021001 9.20 R-A-1 R-M RM RM WDC Consistency
361021002 4.49 R-A-1 R-M RM RM WDC Consistency
361021003 2.19 R-A-1 R-M RM RM WDC Consistency
361021004 1.98 R-A-1 R-M RM RM WDC Consistency
361021016 4.35 R-A-1 R-M RM RM WDC Consistency
361021017 2.11 R-A-1 R-M RM RM WDC Consistency
361021020 2.21 R-A-1 R-M RM RM WDC Consistency
361021021 2.28 R-A-1 R-M RM RM WDC Consistency
361030006 1.10 R-A-1 R-M RM RM WDC Consistency
361030008 0.55 R-A-1 R-M RM RM WDC Consistency
361030010 0.66 R-A-1 R-M RM RM WDC Consistency
361030018 1.14 R-A-1 R-M RM RM WDC Consistency
361030019 45.06 R-A-1 R-M RM RM WDC Consistency
361030001 45.49 R-A-10 R-M RM RM WDC Consistency
361021018 2.43 R-A-2 1/2 R-M RM RM WDC Consistency
361021019 4.48 R-A-2 1/2 R-M RM RM WDC Consistency
361021005 18.23 R-A-5 R-M RM RM WDC Consistency
361021006 19.56 R-A-5 R-M RM RM WDC Consistency
361021007 19.94 R-A-5 R-M RM RM WDC Consistency
361021008 9.95 R-A-5 R-M RM RM WDC Consistency
361021034 4.77 R-A-5 R-M RM RM WDC Consistency
361030003 10.00 R-A-5 R-M RM RM WDC Consistency
361030004 4.82 R-A-5 R-M RM RM WDC Consistency
361030016 3.99 R-A-5 R-M RM RM WDC Consistency
361030022 1.45 R-A-5 R-M RM RM WDC Consistency
3401
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
361030023 0.94 R-A-5 R-M RM RM WDC Consistency
361131001 0.09 R-R R-M RM RM WDC Consistency
361131002 0.09 R-R R-M RM RM WDC Consistency
361131007 0.09 R-R R-M RM RM WDC Consistency
361131008 0.09 R-R R-M RM RM WDC Consistency
361131009 0.09 R-R R-M RM RM WDC Consistency
361131014 0.09 R-R R-M RM RM WDC Consistency
361131015 0.09 R-R R-M RM RM WDC Consistency
361131017 0.09 R-R R-M RM RM WDC Consistency
361131018 0.09 R-R R-M RM RM WDC Consistency
361131019 0.05 R-R R-M RM RM WDC Consistency
361131020 0.05 R-R R-M RM RM WDC Consistency
361131021 0.37 R-R R-M RM RM WDC Consistency
361131022 0.18 R-R R-M RM RM WDC Consistency
361131023 0.18 R-R R-M RM RM WDC Consistency
361132001 0.09 R-R R-M RM RM WDC Consistency
361132002 0.09 R-R R-M RM RM WDC Consistency
361132003 0.09 R-R R-M RM RM WDC Consistency
361132004 0.09 R-R R-M RM RM WDC Consistency
361132005 0.55 R-R R-M RM RM WDC Consistency
361132006 0.09 R-R R-M RM RM WDC Consistency
361132007 0.09 R-R R-M RM RM WDC Consistency
361132008 0.09 R-R R-M RM RM WDC Consistency
361132009 0.09 R-R R-M RM RM WDC Consistency
361132010 0.09 R-R R-M RM RM WDC Consistency
361132011 0.09 R-R R-M RM RM WDC Consistency
361132012 0.09 R-R R-M RM RM WDC Consistency
361132013 0.09 R-R R-M RM RM WDC Consistency
361132015 0.28 R-R R-M RM RM WDC Consistency
361132018 0.38 R-R R-M RM RM WDC Consistency
361133005 0.09 R-R R-M RM RM WDC Consistency
361133006 0.09 R-R R-M RM RM WDC Consistency
361133007 0.09 R-R R-M RM RM WDC Consistency
361133009 0.23 R-R R-M RM RM WDC Consistency
361133010 0.23 R-R R-M RM RM WDC Consistency
361133011 0.28 R-R R-M RM RM WDC Consistency
361134012 0.09 R-R R-M RM RM WDC Consistency
361134013 0.09 R-R R-M RM RM WDC Consistency
361134014 0.09 R-R R-M RM RM WDC Consistency
361134015 0.09 R-R R-M RM RM WDC Consistency
361134016 0.09 R-R R-M RM RM WDC Consistency
361134017 0.09 R-R R-M RM RM WDC Consistency
361134018 0.09 R-R R-M RM RM WDC Consistency
361134019 0.09 R-R R-M RM RM WDC Consistency
361134020 0.09 R-R R-M RM RM WDC Consistency
361134021 0.09 R-R R-M RM RM WDC Consistency
361134024 0.09 R-R R-M RM RM WDC Consistency
361134025 0.09 R-R R-M RM RM WDC Consistency
361134026 0.09 R-R R-M RM RM WDC Consistency
361134027 0.09 R-R R-M RM RM WDC Consistency
361134028 0.09 R-R R-M RM RM WDC Consistency
361134029 0.09 R-R R-M RM RM WDC Consistency
361134030 0.09 R-R R-M RM RM WDC Consistency
3402
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
361134031 0.09 R-R R-M RM RM WDC Consistency
361134032 0.09 R-R R-M RM RM WDC Consistency
361134033 0.09 R-R R-M RM RM WDC Consistency
361134034 0.18 R-R R-M RM RM WDC Consistency
361134035 0.09 R-R R-M RM RM WDC Consistency
361134036 0.09 R-R R-M RM RM WDC Consistency
361134037 0.09 R-R R-M RM RM WDC Consistency
361134038 0.18 R-R R-M RM RM WDC Consistency
361134039 0.44 R-R R-M RM RM WDC Consistency
361140005 0.09 R-R R-M RM RM WDC Consistency
361140006 0.09 R-R R-M RM RM WDC Consistency
361140007 0.09 R-R R-M RM RM WDC Consistency
361140008 0.09 R-R R-M RM RM WDC Consistency
361140009 0.09 R-R R-M RM RM WDC Consistency
361140010 0.09 R-R R-M RM RM WDC Consistency
361140011 0.18 R-R R-M RM RM WDC Consistency
361140012 0.09 R-R R-M RM RM WDC Consistency
361140013 0.09 R-R R-M RM RM WDC Consistency
361140014 0.09 R-R R-M RM RM WDC Consistency
361140015 0.09 R-R R-M RM RM WDC Consistency
361140016 0.09 R-R R-M RM RM WDC Consistency
361140019 0.09 R-R R-M RM RM WDC Consistency
361140020 0.09 R-R R-M RM RM WDC Consistency
361140023 0.09 R-R R-M RM RM WDC Consistency
361140024 0.09 R-R R-M RM RM WDC Consistency
361140025 0.09 R-R R-M RM RM WDC Consistency
361140026 0.09 R-R R-M RM RM WDC Consistency
361140027 0.09 R-R R-M RM RM WDC Consistency
361140028 0.09 R-R R-M RM RM WDC Consistency
361140029 0.01 R-R R-M RM RM WDC Consistency
361140030 0.18 R-R R-M RM RM WDC Consistency
361140031 0.18 R-R R-M RM RM WDC Consistency
361140032 0.18 R-R R-M RM RM WDC Consistency
361151001 0.09 R-R R-M RM RM WDC Consistency
361151002 0.09 R-R R-M RM RM WDC Consistency
361151003 0.09 R-R R-M RM RM WDC Consistency
361151004 0.09 R-R R-M RM RM WDC Consistency
361151005 0.09 R-R R-M RM RM WDC Consistency
361151006 0.09 R-R R-M RM RM WDC Consistency
361151007 0.09 R-R R-M RM RM WDC Consistency
361151008 0.09 R-R R-M RM RM WDC Consistency
361151009 0.09 R-R R-M RM RM WDC Consistency
361151010 0.09 R-R R-M RM RM WDC Consistency
361151014 0.09 R-R R-M RM RM WDC Consistency
361151015 0.09 R-R R-M RM RM WDC Consistency
361151016 0.09 R-R R-M RM RM WDC Consistency
361151017 0.09 R-R R-M RM RM WDC Consistency
361151018 0.09 R-R R-M RM RM WDC Consistency
361151019 0.10 R-R R-M RM RM WDC Consistency
361151020 0.10 R-R R-M RM RM WDC Consistency
361151021 0.10 R-R R-M RM RM WDC Consistency
361151022 0.09 R-R R-M RM RM WDC Consistency
361151025 0.14 R-R R-M RM RM WDC Consistency
3403
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
361151026 0.14 R-R R-M RM RM WDC Consistency
361152001 0.10 R-R R-M RM RM WDC Consistency
361152002 0.10 R-R R-M RM RM WDC Consistency
361152012 0.28 R-R R-M RM RM WDC Consistency
361152013 0.09 R-R R-M RM RM WDC Consistency
361152014 0.09 R-R R-M RM RM WDC Consistency
361152015 0.09 R-R R-M RM RM WDC Consistency
361152026 0.31 R-R R-M RM RM WDC Consistency
361152028 0.18 R-R R-M RM RM WDC Consistency
361152029 0.28 R-R R-M RM RM WDC Consistency
361152030 0.20 R-R R-M RM RM WDC Consistency
361152031 0.73 R-R R-M RM RM WDC Consistency
361152032 0.37 R-R R-M RM RM WDC Consistency
361153002 0.09 R-R R-M RM RM WDC Consistency
361153003 0.09 R-R R-M RM RM WDC Consistency
361153004 0.09 R-R R-M RM RM WDC Consistency
361153005 0.09 R-R R-M RM RM WDC Consistency
361153008 0.09 R-R R-M RM RM WDC Consistency
361153017 0.61 R-R R-M RM RM WDC Consistency
361153018 0.29 R-R R-M RM RM WDC Consistency
361153019 0.28 R-R R-M RM RM WDC Consistency
361153025 0.32 R-R R-M RM RM WDC Consistency
361153027 0.41 R-R R-M RM RM WDC Consistency
361153028 0.17 R-R R-M RM RM WDC Consistency
361153030 0.14 R-R R-M RM RM WDC Consistency
361153031 0.28 R-R R-M RM RM WDC Consistency
361154001 0.10 R-R R-M RM RM WDC Consistency
361154002 0.10 R-R R-M RM RM WDC Consistency
361154003 0.10 R-R R-M RM RM WDC Consistency
361154004 0.09 R-R R-M RM RM WDC Consistency
361154008 0.09 R-R R-M RM RM WDC Consistency
361154009 0.09 R-R R-M RM RM WDC Consistency
361154017 0.09 R-R R-M RM RM WDC Consistency
361154018 0.18 R-R R-M RM RM WDC Consistency
361154025 0.09 R-R R-M RM RM WDC Consistency
361154026 0.18 R-R R-M RM RM WDC Consistency
361154027 0.18 R-R R-M RM RM WDC Consistency
361154030 0.18 R-R R-M RM RM WDC Consistency
361154031 0.00 R-R R-M RM RM WDC Consistency
361154033 0.00 R-R R-M RM RM WDC Consistency
361154034 0.18 R-R R-M RM RM WDC Consistency
361154036 0.18 R-R R-M RM RM WDC Consistency
361154038 0.40 R-R R-M RM RM WDC Consistency
361185001 0.51 R-R R-M RM RM WDC Consistency
361185002 0.46 R-R R-M RM RM WDC Consistency
361201001 0.51 R-R R-M RM RM WDC Consistency
361201003 0.46 R-R R-M RM RM WDC Consistency
361204009 0.23 R-R R-M RM RM WDC Consistency
361204016 0.25 R-R R-M RM RM WDC Consistency
361204017 0.14 R-R R-M RM RM WDC Consistency
361204018 0.17 R-R R-M RM RM WDC Consistency
361204024 0.11 R-R R-M RM RM WDC Consistency
361205011 0.14 R-R R-M RM RM WDC Consistency
3404
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
362130012 19.74 R-R R-M RM RM WDC Consistency
362130021 22.55 R-R R-M RM RM WDC Consistency
362140001 18.49 R-R R-M RM RM WDC Consistency
362140013 4.45 R-R R-M RM RM WDC Consistency
362150024 75.76 R-R R-M RM RM WDC Consistency
365210002 79.71 R-R R-M RM RM WDC Consistency
365210003 12.80 R-R R-M RM RM WDC Consistency
365210004 21.88 R-R R-M RM RM WDC Consistency
365210005 5.00 R-R R-M RM RM WDC Consistency
365210010 81.17 R-R R-M RM RM WDC Consistency
365210011 39.42 R-R R-M RM RM WDC Consistency
365210012 39.93 R-R R-M RM RM WDC Consistency
365210016 19.95 R-R R-M RM RM WDC Consistency
365210040 1.85 R-R R-M RM RM WDC Consistency
365210041 2.69 R-R R-M RM RM WDC Consistency
365210042 4.97 R-R R-M RM RM WDC Consistency
365210043 8.96 R-R R-M RM RM WDC Consistency
365250012 20.73 R-R R-M RM RM WDC Consistency
365250014 20.35 R-R R-M RM RM WDC Consistency
365250019 5.56 R-R R-M RM RM WDC Consistency
365250021 4.04 R-R R-M RM RM WDC Consistency
365250022 5.16 R-R R-M RM RM WDC Consistency
365250023 9.76 R-R R-M RM RM WDC Consistency
365250024 4.74 R-R R-M RM RM WDC Consistency
365250027 4.69 R-R R-M RM RM WDC Consistency
365250028 4.47 R-R R-M RM RM WDC Consistency
365250029 4.75 R-R R-M RM RM WDC Consistency
365250030 4.65 R-R R-M RM RM WDC Consistency
365250031 4.20 R-R R-M RM RM WDC Consistency
365250032 6.07 R-R R-M RM RM WDC Consistency
365250033 6.75 R-R R-M RM RM WDC Consistency
365250034 6.41 R-R R-M RM RM WDC Consistency
365250035 12.49 R-R R-M RM RM WDC Consistency
365250036 5.49 R-R R-M RM RM WDC Consistency
365250037 6.35 R-R R-M RM RM WDC Consistency
365250039 8.87 R-R R-M RM RM WDC Consistency
365250040 9.13 R-R R-M RM RM WDC Consistency
365250041 5.46 R-R R-M RM RM WDC Consistency
365250042 4.82 R-R R-M RM RM WDC Consistency
365250043 5.12 R-R R-M RM RM WDC Consistency
365250044 7.03 R-R R-M RM RM WDC Consistency
365250045 4.75 R-R R-M RM RM WDC Consistency
365250046 4.48 R-R R-M RM RM WDC Consistency
365250047 10.01 R-R R-M RM RM WDC Consistency
365250048 9.71 R-R R-M RM RM WDC Consistency
365250050 4.87 R-R R-M RM RM WDC Consistency
365250051 3.32 R-R R-M RM RM WDC Consistency
365250052 4.43 R-R R-M RM RM WDC Consistency
365250053 6.75 R-R R-M RM RM WDC Consistency
365250055 4.73 R-R R-M RM RM WDC Consistency
365250056 4.36 R-R R-M RM RM WDC Consistency
365250057 7.61 R-R R-M RM RM WDC Consistency
365250058 5.61 R-R R-M RM RM WDC Consistency
3405
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
365250059 5.32 R-R R-M RM RM WDC Consistency
365250064 10.15 R-R R-M RM RM WDC Consistency
365250065 0.39 R-R R-M RM RM WDC Consistency
365270018 9.29 R-R R-M RM RM WDC Consistency
365270028 5.03 R-R R-M RM RM WDC Consistency
365270029 5.05 R-R R-M RM RM WDC Consistency
365270030 5.05 R-R R-M RM RM WDC Consistency
365270041 7.98 R-R R-M RM RM WDC Consistency
365270043 15.60 R-R R-M RM RM WDC Consistency
365270047 12.72 R-R R-M RM RM WDC Consistency
365270048 15.88 R-R R-M RM RM WDC Consistency
365270051 4.60 R-R R-M RM RM WDC Consistency
365270052 4.10 R-R R-M RM RM WDC Consistency
365270053 29.83 R-R R-M RM RM WDC Consistency
365270058 14.91 R-R R-M RM RM WDC Consistency
365270059 4.75 R-R R-M RM RM WDC Consistency
365270069 8.79 R-R R-M RM RM WDC Consistency
365270070 0.19 R-R R-M RM RM WDC Consistency
365270076 4.88 R-R R-M RM RM WDC Consistency
365270078 5.05 R-R R-M RM RM WDC Consistency
365270079 4.28 R-R R-M RM RM WDC Consistency
365270083 4.55 R-R R-M RM RM WDC Consistency
365270085 8.95 R-R R-M RM RM WDC Consistency
365270088 9.53 R-R R-M RM RM WDC Consistency
365270091 2.13 R-R R-M RM RM WDC Consistency
365270093 9.73 R-R R-M RM RM WDC Consistency
365270094 4.77 R-R R-M RM RM WDC Consistency
365270095 13.01 R-R R-M RM RM WDC Consistency
366310002 158.67 R-R R-M RM RM WDC Consistency
366310007 1.43 R-R R-M RM RM WDC Consistency
366310010 20.18 R-R R-M RM RM WDC Consistency
366310011 20.00 R-R R-M RM RM WDC Consistency
366310021 8.58 R-R R-M RM RM WDC Consistency
366310022 10.75 R-R R-M RM RM WDC Consistency
366310024 9.49 R-R R-M RM RM WDC Consistency
366310025 9.59 R-R R-M RM RM WDC Consistency
366310026 9.37 R-R R-M RM RM WDC Consistency
366310027 9.39 R-R R-M RM RM WDC Consistency
366310028 9.11 R-R R-M RM RM WDC Consistency
366310029 8.22 R-R R-M RM RM WDC Consistency
366310030 9.93 R-R R-M RM RM WDC Consistency
366310031 0.87 R-R R-M RM RM WDC Consistency
366310032 0.52 R-R R-M RM RM WDC Consistency
366310033 0.17 R-R R-M RM RM WDC Consistency
366310034 6.30 R-R R-M RM RM WDC Consistency
366320040 7.29 R-R R-M RM RM WDC Consistency
366320049 1.13 R-R R-M RM RM WDC Consistency
366320052 4.69 R-R R-M RM RM WDC Consistency
367270017 3.45 R-R R-M RM RM WDC Consistency
367270018 2.67 R-R R-M RM RM WDC Consistency
367270019 3.12 R-R R-M RM RM WDC Consistency
367280013 10.09 R-R R-M RM RM WDC Consistency
367280026 1.96 R-R R-M RM RM WDC Consistency
3406
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
367280027 2.74 R-R R-M RM RM WDC Consistency
367280028 5.04 R-R R-M RM RM WDC Consistency
367280030 2.67 R-R R-M RM RM WDC Consistency
367280031 3.21 R-R R-M RM RM WDC Consistency
367280033 1.11 R-R R-M RM RM WDC Consistency
367280037 6.06 R-R R-M RM RM WDC Consistency
367280038 4.84 R-R R-M RM RM WDC Consistency
367280039 5.08 R-R R-M RM RM WDC Consistency
367310001 31.12 R-R R-M RM RM WDC Consistency
367310002 5.68 R-R R-M RM RM WDC Consistency
367310009 6.77 R-R R-M RM RM WDC Consistency
367310010 9.17 R-R R-M RM RM WDC Consistency
367310011 2.47 R-R R-M RM RM WDC Consistency
367320006 32.26 R-R R-M RM RM WDC Consistency
367320007 15.38 R-R R-M RM RM WDC Consistency
367320008 15.40 R-R R-M RM RM WDC Consistency
367320009 15.37 R-R R-M RM RM WDC Consistency
367450015 10.52 R-R R-M RM RM WDC Consistency
367450016 0.62 R-R R-M RM RM WDC Consistency
382140002 14.84 R-R R-M RM RM WDC Consistency
382140011 2.68 R-R R-M RM RM WDC Consistency
382150001 7.43 R-R R-M RM RM WDC Consistency
382150002 85.25 R-R R-M RM RM WDC Consistency
382150012 2.58 R-R R-M RM RM WDC Consistency
382150017 3.40 R-R R-M RM RM WDC Consistency
382150028 5.53 R-R R-M RM RM WDC Consistency
382150037 1.72 R-R R-M RM RM WDC Consistency
382150046 5.26 R-R R-M RM RM WDC Consistency
382150048 2.26 R-R R-M RM RM WDC Consistency
382150050 1.87 R-R R-M RM RM WDC Consistency
382150052 13.33 R-R R-M RM RM WDC Consistency
382150053 13.05 R-R R-M RM RM WDC Consistency
382150054 2.27 R-R R-M RM RM WDC Consistency
382160002 49.05 R-R R-M RM RM WDC Consistency
382160004 1.30 R-R R-M RM RM WDC Consistency
382160005 15.56 R-R R-M RM RM WDC Consistency
382160006 6.16 R-R R-M RM RM WDC Consistency
382160008 62.00 R-R R-M RM RM WDC Consistency
382160009 54.69 R-R R-M RM RM WDC Consistency
382160010 0.27 R-R R-M RM RM WDC Consistency
382280016 0.03 R-R R-M RM RM WDC Consistency
382280017 0.12 R-R R-M RM RM WDC Consistency
382320003 79.39 R-R R-M RM RM WDC Consistency
382320009 20.07 R-R R-M RM RM WDC Consistency
382320010 20.96 R-R R-M RM RM WDC Consistency
382320011 34.12 R-R R-M RM RM WDC Consistency
382320012 13.09 R-R R-M RM RM WDC Consistency
382320014 83.86 R-R R-M RM RM WDC Consistency
382330001 20.57 R-R R-M RM RM WDC Consistency
382330002 20.14 R-R R-M RM RM WDC Consistency
382330003 20.14 R-R R-M RM RM WDC Consistency
382340001 21.87 R-R R-M RM RM WDC Consistency
382340002 21.59 R-R R-M RM RM WDC Consistency
3407
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
382350001 23.67 R-R R-M RM RM WDC Consistency
382350002 21.82 R-R R-M RM RM WDC Consistency
382350003 21.82 R-R R-M RM RM WDC Consistency
382360002 20.49 R-R R-M RM RM WDC Consistency
382360003 20.55 R-R R-M RM RM WDC Consistency
382360004 14.47 R-R R-M RM RM WDC Consistency
382370002 19.48 R-R R-M RM RM WDC Consistency
382370003 24.94 R-R R-M RM RM WDC Consistency
382380001 19.77 R-R R-M RM RM WDC Consistency
382380002 20.20 R-R R-M RM RM WDC Consistency
382430002 0.49 R-R R-M RM RM WDC Consistency
370210036 0.74 C-O R-R EDR-RC EDR WDC Consistency
365220013 2.48 R-1 R-R RR EDR WDC Consistency
366092016 3.08 R-1-20000 R-R EDR EDR WDC Consistency
366120004 6.91 R-1-20000 R-R EDR EDR WDC Consistency
367510029 9.05 R-5 R-R EDR-RC EDR WDC Consistency
382280018 0.36 R-A-2 R-R EDR-RC EDR WDC Consistency
382280020 1.84 R-A-2 R-R EDR-RC EDR WDC Consistency
382280021 2.00 R-A-2 R-R EDR-RC EDR WDC Consistency
382280022 2.33 R-A-2 R-R EDR-RC EDR WDC Consistency
382280023 2.39 R-A-2 R-R EDR-RC EDR WDC Consistency
367290015 5.36 R-A-5 R-R EDR-RC EDR WDC Consistency
367290016 4.46 R-A-5 R-R EDR-RC EDR WDC Consistency
367290017 7.09 R-A-5 R-R EDR-RC EDR WDC Consistency
362130022 258.17 R-T R-R EDR-RC EDR WDC Consistency
362130031 64.37 R-T R-R EDR-RC EDR WDC Consistency
362130034 86.87 R-T R-R EDR-RC EDR WDC Consistency
368030027 1.20 C-1/C-P R-R MDR LDR WDC Consistency
370250027 0.50 C-1/C-P R-R MDR LDR WDC Consistency
366230008 2.48 R-1 R-R LDR LDR WDC Consistency
366230009 0.46 R-1 R-R LDR LDR WDC Consistency
366230010 2.31 R-1 R-R LDR LDR WDC Consistency
366230013 0.71 R-1 R-R LDR LDR WDC Consistency
366230014 0.57 R-1 R-R LDR LDR WDC Consistency
367121001 0.19 R-1 R-R LDR LDR WDC Consistency
367121002 0.18 R-1 R-R LDR LDR WDC Consistency
367121003 0.18 R-1 R-R LDR LDR WDC Consistency
367121004 0.18 R-1 R-R LDR LDR WDC Consistency
367121005 0.18 R-1 R-R LDR LDR WDC Consistency
367121006 0.18 R-1 R-R LDR LDR WDC Consistency
367121007 0.20 R-1 R-R LDR LDR WDC Consistency
367121008 0.25 R-1 R-R LDR LDR WDC Consistency
367121009 0.24 R-1 R-R LDR LDR WDC Consistency
367121010 0.23 R-1 R-R LDR LDR WDC Consistency
367121011 0.21 R-1 R-R LDR LDR WDC Consistency
367121012 0.21 R-1 R-R LDR LDR WDC Consistency
367122001 0.17 R-1 R-R LDR LDR WDC Consistency
367122002 0.17 R-1 R-R LDR LDR WDC Consistency
367122003 0.17 R-1 R-R LDR LDR WDC Consistency
367122004 0.17 R-1 R-R LDR LDR WDC Consistency
367122005 0.18 R-1 R-R LDR LDR WDC Consistency
367122006 0.20 R-1 R-R LDR LDR WDC Consistency
367122007 0.21 R-1 R-R LDR LDR WDC Consistency
3408
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
367122008 0.21 R-1 R-R LDR LDR WDC Consistency
367122009 0.24 R-1 R-R LDR LDR WDC Consistency
367122010 0.32 R-1 R-R LDR LDR WDC Consistency
367122011 0.28 R-1 R-R LDR LDR WDC Consistency
367122012 0.24 R-1 R-R LDR LDR WDC Consistency
367122013 0.26 R-1 R-R LDR LDR WDC Consistency
367122014 0.20 R-1 R-R LDR LDR WDC Consistency
367122015 0.26 R-1 R-R LDR LDR WDC Consistency
367122016 0.37 R-1 R-R LDR LDR WDC Consistency
367122017 0.18 R-1 R-R LDR LDR WDC Consistency
367122018 0.20 R-1 R-R LDR LDR WDC Consistency
367122019 0.29 R-1 R-R LDR LDR WDC Consistency
367122020 0.22 R-1 R-R LDR LDR WDC Consistency
367122021 0.22 R-1 R-R LDR LDR WDC Consistency
367122022 0.21 R-1 R-R LDR LDR WDC Consistency
367360001 0.25 R-1 R-R LDR LDR WDC Consistency
367360002 0.24 R-1 R-R LDR LDR WDC Consistency
367360003 0.24 R-1 R-R LDR LDR WDC Consistency
367360004 0.24 R-1 R-R LDR LDR WDC Consistency
367360005 0.23 R-1 R-R LDR LDR WDC Consistency
367360006 0.35 R-1 R-R LDR LDR WDC Consistency
367360007 0.34 R-1 R-R LDR LDR WDC Consistency
367360008 0.23 R-1 R-R LDR LDR WDC Consistency
367360009 0.23 R-1 R-R LDR LDR WDC Consistency
367360010 0.24 R-1 R-R LDR LDR WDC Consistency
367360011 0.24 R-1 R-R LDR LDR WDC Consistency
367360012 0.24 R-1 R-R LDR LDR WDC Consistency
367360013 0.24 R-1 R-R LDR LDR WDC Consistency
367360014 0.24 R-1 R-R LDR LDR WDC Consistency
367360015 0.24 R-1 R-R LDR LDR WDC Consistency
367360016 0.23 R-1 R-R LDR LDR WDC Consistency
367360017 0.23 R-1 R-R LDR LDR WDC Consistency
367360018 0.34 R-1 R-R LDR LDR WDC Consistency
367360019 0.35 R-1 R-R LDR LDR WDC Consistency
367360020 0.23 R-1 R-R LDR LDR WDC Consistency
367360021 0.23 R-1 R-R LDR LDR WDC Consistency
367360022 0.24 R-1 R-R LDR LDR WDC Consistency
367360023 0.24 R-1 R-R LDR LDR WDC Consistency
367360024 0.24 R-1 R-R LDR LDR WDC Consistency
367360025 0.21 R-1 R-R LDR LDR WDC Consistency
367360026 0.21 R-1 R-R LDR LDR WDC Consistency
367360027 0.21 R-1 R-R LDR LDR WDC Consistency
367360028 0.21 R-1 R-R LDR LDR WDC Consistency
367360029 0.21 R-1 R-R LDR LDR WDC Consistency
367360031 0.21 R-1 R-R LDR LDR WDC Consistency
367360032 0.22 R-1 R-R LDR LDR WDC Consistency
367420001 0.24 R-1 R-R LDR LDR WDC Consistency
367420002 0.26 R-1 R-R LDR LDR WDC Consistency
367420003 0.23 R-1 R-R LDR LDR WDC Consistency
367420004 0.23 R-1 R-R LDR LDR WDC Consistency
367420005 0.23 R-1 R-R LDR LDR WDC Consistency
367420006 0.65 R-1 R-R LDR LDR WDC Consistency
367420007 0.24 R-1 R-R LDR LDR WDC Consistency
3409
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
367420008 0.36 R-1 R-R LDR LDR WDC Consistency
367420009 0.31 R-1 R-R LDR LDR WDC Consistency
367420010 0.28 R-1 R-R LDR LDR WDC Consistency
367420011 0.27 R-1 R-R LDR LDR WDC Consistency
367420012 0.25 R-1 R-R LDR LDR WDC Consistency
367420013 0.25 R-1 R-R LDR LDR WDC Consistency
367420014 0.25 R-1 R-R LDR LDR WDC Consistency
367420015 0.25 R-1 R-R LDR LDR WDC Consistency
367420016 0.25 R-1 R-R LDR LDR WDC Consistency
367420017 0.36 R-1 R-R LDR LDR WDC Consistency
367420018 0.33 R-1 R-R LDR LDR WDC Consistency
367420019 0.23 R-1 R-R LDR LDR WDC Consistency
367420020 0.25 R-1 R-R LDR LDR WDC Consistency
367420021 0.25 R-1 R-R LDR LDR WDC Consistency
367420022 0.25 R-1 R-R LDR LDR WDC Consistency
367420023 0.25 R-1 R-R LDR LDR WDC Consistency
367420024 0.25 R-1 R-R LDR LDR WDC Consistency
367420025 0.25 R-1 R-R LDR LDR WDC Consistency
367420026 0.25 R-1 R-R LDR LDR WDC Consistency
367420027 0.25 R-1 R-R LDR LDR WDC Consistency
367420028 0.25 R-1 R-R LDR LDR WDC Consistency
367420029 0.25 R-1 R-R LDR LDR WDC Consistency
367420030 0.23 R-1 R-R LDR LDR WDC Consistency
367420031 0.28 R-1 R-R LDR LDR WDC Consistency
367420032 0.29 R-1 R-R LDR LDR WDC Consistency
367420033 0.23 R-1 R-R LDR LDR WDC Consistency
367420034 0.25 R-1 R-R LDR LDR WDC Consistency
367420035 0.25 R-1 R-R LDR LDR WDC Consistency
367420036 0.25 R-1 R-R LDR LDR WDC Consistency
367420037 0.25 R-1 R-R LDR LDR WDC Consistency
367420038 0.25 R-1 R-R LDR LDR WDC Consistency
367420039 0.25 R-1 R-R LDR LDR WDC Consistency
367420040 0.25 R-1 R-R LDR LDR WDC Consistency
367420041 0.24 R-1 R-R LDR LDR WDC Consistency
367420042 0.24 R-1 R-R LDR LDR WDC Consistency
367420043 0.24 R-1 R-R LDR LDR WDC Consistency
367420044 0.24 R-1 R-R LDR LDR WDC Consistency
367420045 0.25 R-1 R-R LDR LDR WDC Consistency
368030007 0.46 R-1-15000 R-R LDR LDR WDC Consistency
367150017 7.51 R-1-18000 R-R LDR LDR WDC Consistency
367160006 9.55 R-1-18000 R-R LDR LDR WDC Consistency
368110059 0.49 R-1-20000 R-R LDR LDR WDC Consistency
368110060 0.49 R-1-20000 R-R LDR LDR WDC Consistency
368272016 0.46 R-1-20000 R-R LDR LDR WDC Consistency
368272017 0.45 R-1-20000 R-R LDR LDR WDC Consistency
368272018 0.52 R-1-20000 R-R LDR LDR WDC Consistency
368272019 0.56 R-1-20000 R-R LDR LDR WDC Consistency
368272020 0.56 R-1-20000 R-R LDR LDR WDC Consistency
368272021 0.53 R-1-20000 R-R LDR LDR WDC Consistency
368272022 0.45 R-1-20000 R-R LDR LDR WDC Consistency
368272023 0.47 R-1-20000 R-R LDR LDR WDC Consistency
368272024 0.96 R-1-20000 R-R LDR LDR WDC Consistency
368272025 0.98 R-1-20000 R-R LDR LDR WDC Consistency
3410
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
362740029 10.21 R-A R-R LDR LDR WDC Consistency
362740030 0.30 R-A R-R LDR LDR WDC Consistency
367050047 1.30 R-A R-R LDR LDR WDC Consistency
367130003 4.73 R-A R-R LDR LDR WDC Consistency
368251012 0.87 R-A R-R LDR LDR WDC Consistency
368251013 0.95 R-A R-R LDR LDR WDC Consistency
368251014 0.47 R-A R-R LDR LDR WDC Consistency
368251015 0.46 R-A R-R LDR LDR WDC Consistency
368251016 0.48 R-A R-R LDR LDR WDC Consistency
368251017 0.46 R-A R-R LDR LDR WDC Consistency
368251018 0.46 R-A R-R LDR LDR WDC Consistency
368251019 0.47 R-A R-R LDR LDR WDC Consistency
368251020 0.47 R-A R-R LDR LDR WDC Consistency
368251021 0.46 R-A R-R LDR LDR WDC Consistency
368251022 0.46 R-A R-R LDR LDR WDC Consistency
368252001 0.46 R-A R-R LDR LDR WDC Consistency
368252002 0.46 R-A R-R LDR LDR WDC Consistency
368252003 0.46 R-A R-R LDR LDR WDC Consistency
368252004 0.46 R-A R-R LDR LDR WDC Consistency
368252005 0.46 R-A R-R LDR LDR WDC Consistency
368252006 0.46 R-A R-R LDR LDR WDC Consistency
368252007 0.46 R-A R-R LDR LDR WDC Consistency
368252008 0.46 R-A R-R LDR LDR WDC Consistency
368252009 0.46 R-A R-R LDR LDR WDC Consistency
368252010 0.46 R-A R-R LDR LDR WDC Consistency
368252011 0.46 R-A R-R LDR LDR WDC Consistency
368252012 0.50 R-A R-R LDR LDR WDC Consistency
368252013 0.48 R-A R-R LDR LDR WDC Consistency
368252014 0.48 R-A R-R LDR LDR WDC Consistency
368252015 0.46 R-A R-R LDR LDR WDC Consistency
368252016 0.46 R-A R-R LDR LDR WDC Consistency
368252017 0.46 R-A R-R LDR LDR WDC Consistency
368252018 0.46 R-A R-R LDR LDR WDC Consistency
368252019 0.46 R-A R-R LDR LDR WDC Consistency
368252020 0.46 R-A R-R LDR LDR WDC Consistency
368252021 0.46 R-A R-R LDR LDR WDC Consistency
368252022 0.46 R-A R-R LDR LDR WDC Consistency
368252023 0.46 R-A R-R LDR LDR WDC Consistency
368252024 0.46 R-A R-R LDR LDR WDC Consistency
368252025 0.45 R-A R-R LDR LDR WDC Consistency
368300001 0.50 R-A R-R LDR LDR WDC Consistency
368300002 0.51 R-A R-R LDR LDR WDC Consistency
368300003 0.51 R-A R-R LDR LDR WDC Consistency
368300004 0.45 R-A R-R LDR LDR WDC Consistency
368300005 0.40 R-A R-R LDR LDR WDC Consistency
368300006 0.52 R-A R-R LDR LDR WDC Consistency
368300007 0.51 R-A R-R LDR LDR WDC Consistency
368300008 0.41 R-A R-R LDR LDR WDC Consistency
368300009 0.43 R-A R-R LDR LDR WDC Consistency
368300010 0.44 R-A R-R LDR LDR WDC Consistency
368300011 0.41 R-A R-R LDR LDR WDC Consistency
368300012 0.51 R-A R-R LDR LDR WDC Consistency
368300013 0.52 R-A R-R LDR LDR WDC Consistency
3411
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
368300014 0.41 R-A R-R LDR LDR WDC Consistency
368300015 0.46 R-A R-R LDR LDR WDC Consistency
368300016 0.52 R-A R-R LDR LDR WDC Consistency
368300017 0.51 R-A R-R LDR LDR WDC Consistency
368300018 0.51 R-A R-R LDR LDR WDC Consistency
368310001 0.82 R-A R-R LDR LDR WDC Consistency
368310002 0.76 R-A R-R LDR LDR WDC Consistency
368310003 0.75 R-A R-R LDR LDR WDC Consistency
368310004 0.68 R-A R-R LDR LDR WDC Consistency
368310005 0.56 R-A R-R LDR LDR WDC Consistency
368310006 0.45 R-A R-R LDR LDR WDC Consistency
368310007 0.46 R-A R-R LDR LDR WDC Consistency
368310008 0.45 R-A R-R LDR LDR WDC Consistency
368310009 0.46 R-A R-R LDR LDR WDC Consistency
368310010 0.46 R-A R-R LDR LDR WDC Consistency
368310011 0.46 R-A R-R LDR LDR WDC Consistency
368310012 0.46 R-A R-R LDR LDR WDC Consistency
368310013 0.46 R-A R-R LDR LDR WDC Consistency
368310014 0.82 R-A R-R LDR LDR WDC Consistency
368310015 0.47 R-A R-R LDR LDR WDC Consistency
368310016 0.46 R-A R-R LDR LDR WDC Consistency
368310017 0.46 R-A R-R LDR LDR WDC Consistency
368310018 0.45 R-A R-R LDR LDR WDC Consistency
368310019 1.00 R-A R-R LDR LDR WDC Consistency
368310020 0.73 R-A R-R LDR LDR WDC Consistency
368310021 0.48 R-A R-R LDR LDR WDC Consistency
368310022 0.50 R-A R-R LDR LDR WDC Consistency
368310023 0.48 R-A R-R LDR LDR WDC Consistency
368310024 0.46 R-A R-R LDR LDR WDC Consistency
368310025 0.46 R-A R-R LDR LDR WDC Consistency
368310026 0.46 R-A R-R LDR LDR WDC Consistency
368310027 0.49 R-A R-R LDR LDR WDC Consistency
368311001 0.46 R-A R-R LDR LDR WDC Consistency
368311002 0.44 R-A R-R LDR LDR WDC Consistency
368311003 0.48 R-A R-R LDR LDR WDC Consistency
368311004 0.58 R-A R-R LDR LDR WDC Consistency
368311005 0.50 R-A R-R LDR LDR WDC Consistency
368311006 0.47 R-A R-R LDR LDR WDC Consistency
368311007 0.57 R-A R-R LDR LDR WDC Consistency
368311008 0.57 R-A R-R LDR LDR WDC Consistency
368311009 0.63 R-A R-R LDR LDR WDC Consistency
368311010 0.41 R-A R-R LDR LDR WDC Consistency
368311011 0.43 R-A R-R LDR LDR WDC Consistency
368311012 0.50 R-A R-R LDR LDR WDC Consistency
370230046 0.50 R-A R-R LDR-RC LDR WDC Consistency
370230047 0.50 R-A R-R LDR-RC LDR WDC Consistency
370230048 0.50 R-A R-R LDR-RC LDR WDC Consistency
370230049 0.50 R-A R-R LDR-RC LDR WDC Consistency
370230050 0.56 R-A R-R LDR-RC LDR WDC Consistency
370230051 0.53 R-A R-R LDR-RC LDR WDC Consistency
370230052 0.53 R-A R-R LDR-RC LDR WDC Consistency
366240067 0.16 ROW R-R LDR LDR WDC Consistency
367300037 1.00 R-1-1 R-R VLDR VLDR WDC Consistency
3412
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
367300038 1.00 R-1-1 R-R VLDR VLDR WDC Consistency
368200014 1.33 R-A R-R VLDR VLDR WDC Consistency
361021010 2.05 R-A-1 R-R VLDR-RC VLDR WDC Consistency
361021015 4.35 R-A-1 R-R VLDR-RC VLDR WDC Consistency
361021022 2.27 R-A-1 R-R VLDR-RC VLDR WDC Consistency
361021023 2.06 R-A-1 R-R VLDR-RC VLDR WDC Consistency
361021024 2.47 R-A-1 R-R VLDR-RC VLDR WDC Consistency
361021025 2.08 R-A-1 R-R VLDR-RC VLDR WDC Consistency
361021026 2.08 R-A-1 R-R VLDR-RC VLDR WDC Consistency
361021027 2.46 R-A-1 R-R VLDR-RC VLDR WDC Consistency
361021028 2.18 R-A-1 R-R VLDR-RC VLDR WDC Consistency
361021029 2.08 R-A-1 R-R VLDR-RC VLDR WDC Consistency
361021009 2.46 R-A-2 1/2 R-R RR VLDR WDC Consistency
361021011 4.78 R-A-2 1/2 R-R RR VLDR WDC Consistency
380160020 3.67 W-1 R-R VLDR VLDR WDC Consistency
366033001 1.01 C-1/C-P C-G CR CR Zone Consolidation
366033009 0.52 C-1/C-P C-G CR CR Zone Consolidation
366033010 0.36 C-1/C-P C-G CR CR Zone Consolidation
366033013 0.42 C-1/C-P C-G CR CR Zone Consolidation
366033015 1.32 C-1/C-P C-G CR CR Zone Consolidation
366033020 0.81 C-1/C-P C-G CR CR Zone Consolidation
366033021 0.78 C-1/C-P C-G CR CR Zone Consolidation
366033022 0.58 C-1/C-P C-G CR CR Zone Consolidation
366033023 0.45 C-1/C-P C-G CR CR Zone Consolidation
366033026 2.69 C-1/C-P C-G CR CR Zone Consolidation
366033027 1.35 C-1/C-P C-G CR CR Zone Consolidation
366033028 1.50 C-1/C-P C-G CR CR Zone Consolidation
366130005 0.25 C-1/C-P C-G CR CR Zone Consolidation
366130021 0.74 C-1/C-P C-G CR CR Zone Consolidation
366130023 0.43 C-1/C-P C-G CR CR Zone Consolidation
366130038 0.44 C-1/C-P C-G CR CR Zone Consolidation
366130046 1.47 C-1/C-P C-G CR CR Zone Consolidation
366130047 1.46 C-1/C-P C-G CR CR Zone Consolidation
366130048 1.33 C-1/C-P C-G CR CR Zone Consolidation
366130049 3.44 C-1/C-P C-G CR CR Zone Consolidation
366140008 0.93 C-1/C-P C-G CR CR Zone Consolidation
366140009 0.93 C-1/C-P C-G CR CR Zone Consolidation
366140010 0.93 C-1/C-P C-G CR CR Zone Consolidation
366140011 1.46 C-1/C-P C-G CR CR Zone Consolidation
366140012 0.17 C-1/C-P C-G CR CR Zone Consolidation
366140013 0.91 C-1/C-P C-G CR CR Zone Consolidation
366140014 3.71 C-1/C-P C-G CR CR Zone Consolidation
366150003 2.04 C-1/C-P C-G CR CR Zone Consolidation
366150004 1.95 C-1/C-P C-G CR CR Zone Consolidation
366150034 0.12 C-1/C-P C-G CR CR Zone Consolidation
366150035 0.50 C-1/C-P C-G CR CR Zone Consolidation
366150036 0.53 C-1/C-P C-G CR CR Zone Consolidation
366150037 0.76 C-1/C-P C-G CR CR Zone Consolidation
366150038 1.69 C-1/C-P C-G CR CR Zone Consolidation
366160005 0.89 C-1/C-P C-G CR CR Zone Consolidation
366160009 0.90 C-1/C-P C-G CR CR Zone Consolidation
366160014 1.46 C-1/C-P C-G CR CR Zone Consolidation
366160015 0.29 C-1/C-P C-G CR CR Zone Consolidation
3413
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
366160017 0.08 C-1/C-P C-G CR CR Zone Consolidation
366160019 0.50 C-1/C-P C-G CR CR Zone Consolidation
366160020 1.43 C-1/C-P C-G CR CR Zone Consolidation
366160033 0.51 C-1/C-P C-G CR CR Zone Consolidation
366160034 0.54 C-1/C-P C-G CR CR Zone Consolidation
366160035 0.50 C-1/C-P C-G CR CR Zone Consolidation
366160036 0.56 C-1/C-P C-G CR CR Zone Consolidation
366160037 1.86 C-1/C-P C-G CR CR Zone Consolidation
366160038 1.88 C-1/C-P C-G CR CR Zone Consolidation
366160039 1.88 C-1/C-P C-G CR CR Zone Consolidation
366160040 1.88 C-1/C-P C-G CR CR Zone Consolidation
366160041 0.53 C-1/C-P C-G CR CR Zone Consolidation
366160042 0.52 C-1/C-P C-G CR CR Zone Consolidation
366160043 0.53 C-1/C-P C-G CR CR Zone Consolidation
366160044 0.69 C-1/C-P C-G CR CR Zone Consolidation
366160045 0.58 C-1/C-P C-G CR CR Zone Consolidation
366160046 0.64 C-1/C-P C-G CR CR Zone Consolidation
366160047 0.64 C-1/C-P C-G CR CR Zone Consolidation
366160048 0.72 C-1/C-P C-G CR CR Zone Consolidation
366160052 0.71 C-1/C-P C-G CR CR Zone Consolidation
366160053 0.51 C-1/C-P C-G CR CR Zone Consolidation
366160063 0.61 C-1/C-P C-G CR CR Zone Consolidation
366160064 0.52 C-1/C-P C-G CR CR Zone Consolidation
366160066 0.73 C-1/C-P C-G CR CR Zone Consolidation
366160067 0.72 C-1/C-P C-G CR CR Zone Consolidation
366160070 1.01 C-1/C-P C-G CR CR Zone Consolidation
366160075 2.63 C-1/C-P C-G CR CR Zone Consolidation
366210038 2.20 C-1/C-P C-G CR CR Zone Consolidation
366210052 1.45 C-1/C-P C-G CR CR Zone Consolidation
366210053 1.16 C-1/C-P C-G CR CR Zone Consolidation
366210054 1.10 C-1/C-P C-G CR CR Zone Consolidation
366300041 1.31 C-1/C-P C-G CR CR Zone Consolidation
366300081 2.65 C-1/C-P C-G CR CR Zone Consolidation
366300082 3.80 C-1/C-P C-G CR CR Zone Consolidation
366390034 1.24 C-1/C-P C-G CR CR Zone Consolidation
367020014 0.55 C-1/C-P C-G CR CR Zone Consolidation
367020015 1.10 C-1/C-P C-G CR CR Zone Consolidation
367020017 1.43 C-1/C-P C-G CR CR Zone Consolidation
367020020 0.55 C-1/C-P C-G CR CR Zone Consolidation
367020021 0.55 C-1/C-P C-G CR CR Zone Consolidation
367020023 0.55 C-1/C-P C-G CR CR Zone Consolidation
367020024 0.55 C-1/C-P C-G CR CR Zone Consolidation
367020025 0.55 C-1/C-P C-G CR CR Zone Consolidation
367020026 0.54 C-1/C-P C-G CR CR Zone Consolidation
367020027 0.56 C-1/C-P C-G CR CR Zone Consolidation
367020028 0.55 C-1/C-P C-G CR CR Zone Consolidation
367020029 0.55 C-1/C-P C-G CR CR Zone Consolidation
367020030 0.55 C-1/C-P C-G CR CR Zone Consolidation
367040038 4.11 C-1/C-P C-G CR CR Zone Consolidation
367100044 1.05 C-1/C-P C-G CR CR Zone Consolidation
367100045 0.69 C-1/C-P C-G CR CR Zone Consolidation
367100046 0.83 C-1/C-P C-G CR CR Zone Consolidation
367100047 1.39 C-1/C-P C-G CR CR Zone Consolidation
3414
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
367100049 0.37 C-1/C-P C-G CR CR Zone Consolidation
367100051 0.64 C-1/C-P C-G CR CR Zone Consolidation
367100052 0.96 C-1/C-P C-G CR CR Zone Consolidation
368030024 1.07 C-1/C-P C-G CR CR Zone Consolidation
368030025 0.90 C-1/C-P C-G CR CR Zone Consolidation
368030026 0.75 C-1/C-P C-G CR CR Zone Consolidation
368060004 1.05 C-1/C-P C-G CR CR Zone Consolidation
368060005 1.21 C-1/C-P C-G CR CR Zone Consolidation
368060019 2.15 C-1/C-P C-G CR CR Zone Consolidation
368091025 0.37 C-1/C-P C-G CR CR Zone Consolidation
368091026 0.38 C-1/C-P C-G CR CR Zone Consolidation
368091033 0.33 C-1/C-P C-G CR CR Zone Consolidation
368091035 0.97 C-1/C-P C-G CR CR Zone Consolidation
370060003 0.45 C-1/C-P C-G CR CR Zone Consolidation
370060026 0.07 C-1/C-P C-G CR CR Zone Consolidation
370060027 0.22 C-1/C-P C-G CR CR Zone Consolidation
370060028 0.41 C-1/C-P C-G CR CR Zone Consolidation
370060051 2.84 C-1/C-P C-G CR CR Zone Consolidation
370090033 0.59 C-1/C-P C-G CR CR Zone Consolidation
370090034 0.46 C-1/C-P C-G CR CR Zone Consolidation
370090035 0.52 C-1/C-P C-G CR CR Zone Consolidation
376051001 0.37 C-1/C-P C-G CR CR Zone Consolidation
376051002 0.56 C-1/C-P C-G CR CR Zone Consolidation
376051003 0.19 C-1/C-P C-G CR CR Zone Consolidation
376051004 0.37 C-1/C-P C-G CR CR Zone Consolidation
376051005 0.37 C-1/C-P C-G CR CR Zone Consolidation
376051006 0.37 C-1/C-P C-G CR CR Zone Consolidation
376052001 0.98 C-1/C-P C-G CR CR Zone Consolidation
376052002 0.52 C-1/C-P C-G CR CR Zone Consolidation
376052003 0.28 C-1/C-P C-G CR CR Zone Consolidation
376052013 0.25 C-1/C-P C-G CR CR Zone Consolidation
376052014 0.19 C-1/C-P C-G CR CR Zone Consolidation
376052015 0.18 C-1/C-P C-G CR CR Zone Consolidation
376052016 0.18 C-1/C-P C-G CR CR Zone Consolidation
376060014 0.13 C-1/C-P C-G CR CR Zone Consolidation
376060015 6.50 C-1/C-P C-G CR CR Zone Consolidation
376060018 4.27 C-1/C-P C-G CR CR Zone Consolidation
376060019 2.13 C-1/C-P C-G CR CR Zone Consolidation
376060030 2.83 C-1/C-P C-G CR CR Zone Consolidation
376150001 1.41 C-1/C-P C-G CR CR Zone Consolidation
376150002 1.00 C-1/C-P C-G CR CR Zone Consolidation
376150003 0.92 C-1/C-P C-G CR CR Zone Consolidation
376150004 0.92 C-1/C-P C-G CR CR Zone Consolidation
376150005 0.51 C-1/C-P C-G CR CR Zone Consolidation
376150006 0.57 C-1/C-P C-G CR CR Zone Consolidation
376150007 0.68 C-1/C-P C-G CR CR Zone Consolidation
376150008 0.75 C-1/C-P C-G CR CR Zone Consolidation
376150010 0.68 C-1/C-P C-G CR CR Zone Consolidation
376150011 0.61 C-1/C-P C-G CR CR Zone Consolidation
376150013 0.61 C-1/C-P C-G CR CR Zone Consolidation
380110007 2.57 C-1/C-P C-G CR CR Zone Consolidation
380110008 2.16 C-1/C-P C-G CR CR Zone Consolidation
380120003 1.93 C-1/C-P C-G CR CR Zone Consolidation
3415
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
380120004 1.63 C-1/C-P C-G CR CR Zone Consolidation
380120005 3.08 C-1/C-P C-G CR CR Zone Consolidation
380120006 1.17 C-1/C-P C-G CR CR Zone Consolidation
380120012 1.42 C-1/C-P C-G CR CR Zone Consolidation
380120013 3.21 C-1/C-P C-G CR CR Zone Consolidation
380130013 2.94 C-1/C-P C-G CR CR Zone Consolidation
380130014 2.28 C-1/C-P C-G CR CR Zone Consolidation
380130020 1.43 C-1/C-P C-G CR CR Zone Consolidation
380130021 0.73 C-1/C-P C-G CR CR Zone Consolidation
380130024 0.56 C-1/C-P C-G CR CR Zone Consolidation
380130025 1.89 C-1/C-P C-G CR CR Zone Consolidation
380130026 4.64 C-1/C-P C-G CR CR Zone Consolidation
380130027 1.51 C-1/C-P C-G CR CR Zone Consolidation
380130028 1.51 C-1/C-P C-G CR CR Zone Consolidation
380130031 0.63 C-1/C-P C-G CR CR Zone Consolidation
380130032 0.59 C-1/C-P C-G CR CR Zone Consolidation
380130034 1.68 C-1/C-P C-G CR CR Zone Consolidation
380140004 2.27 C-1/C-P C-G CR CR Zone Consolidation
380140005 1.72 C-1/C-P C-G CR CR Zone Consolidation
380140006 1.16 C-1/C-P C-G CR CR Zone Consolidation
380140007 1.22 C-1/C-P C-G CR CR Zone Consolidation
380140009 2.57 C-1/C-P C-G CR CR Zone Consolidation
380140010 3.25 C-1/C-P C-G CR CR Zone Consolidation
380140018 7.03 C-1/C-P C-G CR CR Zone Consolidation
380150018 1.28 C-1/C-P C-G CR CR Zone Consolidation
380150019 1.80 C-1/C-P C-G CR CR Zone Consolidation
380150020 1.15 C-1/C-P C-G CR CR Zone Consolidation
376410027 1.26 M-I C-G CR CR Zone Consolidation
367181011 0.04 C-P-S C-H CR C Zone Consolidation
367130042 3.13 C-P-S C-H CR CO Zone Consolidation
376410011 5.60 C-P-S C-H CO CO Zone Consolidation
362250032 4.36 C-P-S C-H CR CR Zone Consolidation
366290007 0.13 C-P-S C-H CR CR Zone Consolidation
366290008 6.04 C-P-S C-H CR CR Zone Consolidation
366290010 1.10 C-P-S C-H CR CR Zone Consolidation
366290011 1.24 C-P-S C-H CR CR Zone Consolidation
366390018 0.62 C-P-S C-H CR CR Zone Consolidation
366390019 0.59 C-P-S C-H CR CR Zone Consolidation
366390020 0.45 C-P-S C-H CR CR Zone Consolidation
366390021 0.45 C-P-S C-H CR CR Zone Consolidation
366390022 0.45 C-P-S C-H CR CR Zone Consolidation
366390023 0.45 C-P-S C-H CR CR Zone Consolidation
366390028 0.66 C-P-S C-H CR CR Zone Consolidation
366390029 0.62 C-P-S C-H CR CR Zone Consolidation
366390030 2.09 C-P-S C-H CR CR Zone Consolidation
366390033 1.04 C-P-S C-H CR CR Zone Consolidation
367100018 2.01 C-P-S C-H CR CR Zone Consolidation
367100021 4.75 C-P-S C-H CR CR Zone Consolidation
367100025 0.55 C-P-S C-H CR CR Zone Consolidation
367100026 2.40 C-P-S C-H CR CR Zone Consolidation
367100029 1.58 C-P-S C-H CR CR Zone Consolidation
367100030 0.74 C-P-S C-H CR CR Zone Consolidation
367100031 4.73 C-P-S C-H CR CR Zone Consolidation
3416
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
367100032 7.85 C-P-S C-H CR CR Zone Consolidation
367100038 2.31 C-P-S C-H CR CR Zone Consolidation
367100039 0.66 C-P-S C-H CR CR Zone Consolidation
367100040 0.81 C-P-S C-H CR CR Zone Consolidation
367100041 21.32 C-P-S C-H CR CR Zone Consolidation
367130019 2.92 C-P-S C-H CR CR Zone Consolidation
367130030 2.80 C-P-S C-H CR CR Zone Consolidation
367130036 0.95 C-P-S C-H CR CR Zone Consolidation
367180065 0.40 C-P-S C-H CR CR Zone Consolidation
367180066 2.01 C-P-S C-H CR CR Zone Consolidation
367180067 7.16 C-P-S C-H CR CR Zone Consolidation
367181001 0.03 C-P-S C-H CR CR Zone Consolidation
367181002 0.02 C-P-S C-H CR CR Zone Consolidation
367181003 0.02 C-P-S C-H CR CR Zone Consolidation
367181004 0.09 C-P-S C-H CR CR Zone Consolidation
367181005 0.04 C-P-S C-H CR CR Zone Consolidation
367181006 0.04 C-P-S C-H CR CR Zone Consolidation
367181007 0.04 C-P-S C-H CR CR Zone Consolidation
367181008 0.04 C-P-S C-H CR CR Zone Consolidation
367181009 0.03 C-P-S C-H CR CR Zone Consolidation
367181010 0.06 C-P-S C-H CR CR Zone Consolidation
367181012 0.02 C-P-S C-H CR CR Zone Consolidation
367181013 0.02 C-P-S C-H CR CR Zone Consolidation
367181014 0.04 C-P-S C-H CR CR Zone Consolidation
367181016 0.09 C-P-S C-H CR CR Zone Consolidation
367181017 0.08 C-P-S C-H CR CR Zone Consolidation
367181018 0.28 C-P-S C-H CR CR Zone Consolidation
367181019 0.29 C-P-S C-H CR CR Zone Consolidation
367300004 0.86 C-P-S C-H CR CR Zone Consolidation
376180007 0.68 C-P-S C-H CR CR Zone Consolidation
376180008 1.24 C-P-S C-H CR CR Zone Consolidation
376180011 0.04 C-P-S C-H CR CR Zone Consolidation
376410025 14.64 C-P-S C-H CR CR Zone Consolidation
380110001 1.71 C-P-S C-H CR CR Zone Consolidation
380110002 1.99 C-P-S C-H CR CR Zone Consolidation
380110003 2.41 C-P-S C-H CR CR Zone Consolidation
380110004 0.06 C-P-S C-H CR CR Zone Consolidation
380110009 1.76 C-P-S C-H CR CR Zone Consolidation
380110010 2.38 C-P-S C-H CR CR Zone Consolidation
380110014 1.09 C-P-S C-H CR CR Zone Consolidation
380110016 3.64 C-P-S C-H CR CR Zone Consolidation
380110030 4.74 C-P-S C-H CR CR Zone Consolidation
380110031 0.79 C-P-S C-H CR CR Zone Consolidation
380110032 0.77 C-P-S C-H CR CR Zone Consolidation
380110033 0.87 C-P-S C-H CR CR Zone Consolidation
380110034 1.18 C-P-S C-H CR CR Zone Consolidation
380110035 0.58 C-P-S C-H CR CR Zone Consolidation
380110036 0.61 C-P-S C-H CR CR Zone Consolidation
380110037 0.28 C-P-S C-H CR CR Zone Consolidation
380110040 0.73 C-P-S C-H CR CR Zone Consolidation
380110041 1.43 C-P-S C-H CR CR Zone Consolidation
380110042 0.92 C-P-S C-H CR CR Zone Consolidation
380110043 0.98 C-P-S C-H CR CR Zone Consolidation
3417
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
380110047 0.01 C-P-S C-H CR CR Zone Consolidation
380110048 0.53 C-P-S C-H CR CR Zone Consolidation
380110049 0.35 C-P-S C-H CR CR Zone Consolidation
380110050 0.02 C-P-S C-H CR CR Zone Consolidation
380110051 0.45 C-P-S C-H CR CR Zone Consolidation
380110052 0.45 C-P-S C-H CR CR Zone Consolidation
380110053 1.73 C-P-S C-H CR CR Zone Consolidation
380110054 0.22 C-P-S C-H CR CR Zone Consolidation
380110055 0.03 C-P-S C-H CR CR Zone Consolidation
380110056 0.43 C-P-S C-H CR CR Zone Consolidation
380110057 0.54 C-P-S C-H CR CR Zone Consolidation
380240001 0.67 C-P-S C-H CR CR Zone Consolidation
380240006 0.40 C-P-S C-H CR CR Zone Consolidation
380240009 0.62 C-P-S C-H CR CR Zone Consolidation
380240010 0.75 C-P-S C-H CR CR Zone Consolidation
380240011 0.89 C-P-S C-H CR CR Zone Consolidation
380240012 0.95 C-P-S C-H CR CR Zone Consolidation
380240015 0.65 C-P-S C-H CR CR Zone Consolidation
380240024 6.05 C-P-S C-H CR CR Zone Consolidation
380240026 2.45 C-P-S C-H CR CR Zone Consolidation
380240027 0.29 C-P-S C-H CR CR Zone Consolidation
380240037 0.63 C-P-S C-H CR CR Zone Consolidation
380240038 0.55 C-P-S C-H CR CR Zone Consolidation
380240041 0.34 C-P-S C-H CR CR Zone Consolidation
380240048 1.75 C-P-S C-H CR CR Zone Consolidation
380240049 1.82 C-P-S C-H CR CR Zone Consolidation
380240050 3.63 C-P-S C-H CR CR Zone Consolidation
380240051 0.13 C-P-S C-H CR CR Zone Consolidation
380240052 1.12 C-P-S C-H CR CR Zone Consolidation
380240058 1.09 C-P-S C-H CR CR Zone Consolidation
380240060 0.86 C-P-S C-H CR CR Zone Consolidation
380240061 0.73 C-P-S C-H CR CR Zone Consolidation
380240062 0.24 C-P-S C-H CR CR Zone Consolidation
380240063 0.22 C-P-S C-H CR CR Zone Consolidation
380240064 0.52 C-P-S C-H CR CR Zone Consolidation
376320002 5.01 M-SC M-I BP BP Zone Consolidation
376320003 5.10 M-SC M-I BP BP Zone Consolidation
376320004 2.57 M-SC M-I BP BP Zone Consolidation
376320005 2.42 M-SC M-I BP BP Zone Consolidation
376320006 2.42 M-SC M-I BP BP Zone Consolidation
376320007 2.66 M-SC M-I BP BP Zone Consolidation
376330006 2.52 M-SC M-I BP BP Zone Consolidation
376330007 2.52 M-SC M-I BP BP Zone Consolidation
376330008 2.28 M-SC M-I BP BP Zone Consolidation
376330009 1.47 M-SC M-I BP BP Zone Consolidation
376330010 1.51 M-SC M-I BP BP Zone Consolidation
376330011 1.98 M-SC M-I BP BP Zone Consolidation
376330012 3.07 M-SC M-I BP BP Zone Consolidation
376330013 2.50 M-SC M-I BP BP Zone Consolidation
376330014 2.70 M-SC M-I BP BP Zone Consolidation
376330018 3.07 M-SC M-I BP BP Zone Consolidation
376330019 2.40 M-SC M-I BP BP Zone Consolidation
376330020 2.39 M-SC M-I BP BP Zone Consolidation
3418
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
376330021 4.66 M-SC M-I BP BP Zone Consolidation
376330022 5.39 M-SC M-I BP BP Zone Consolidation
376320008 4.37 R-R M-I VLDR BP Zone Consolidation
376320009 4.78 R-R M-I VLDR BP Zone Consolidation
376320010 10.15 R-R M-I VLDR BP Zone Consolidation
367210038 1.89 M-SC M-I BP CR Zone Consolidation
362250013 2.00 I-P M-I BP LI Zone Consolidation
362250014 2.99 I-P M-I BP LI Zone Consolidation
362250015 2.27 I-P M-I BP LI Zone Consolidation
362250017 3.78 I-P M-I BP LI Zone Consolidation
362250018 4.09 I-P M-I BP LI Zone Consolidation
362250019 4.15 I-P M-I BP LI Zone Consolidation
362250025 3.80 I-P M-I BP LI Zone Consolidation
370060035 6.27 I-P M-I LI LI Zone Consolidation
370060040 0.68 I-P M-I LI LI Zone Consolidation
370060049 1.39 I-P M-I LI LI Zone Consolidation
380250004 4.63 I-P M-I BP LI Zone Consolidation
380250005 4.62 I-P M-I BP LI Zone Consolidation
380250011 2.06 I-P M-I LI LI Zone Consolidation
380250012 1.63 I-P M-I LI LI Zone Consolidation
380250013 1.41 I-P M-I LI LI Zone Consolidation
380250015 3.56 I-P M-I LI LI Zone Consolidation
380250016 3.53 I-P M-I LI LI Zone Consolidation
380250017 2.54 I-P M-I LI LI Zone Consolidation
380250039 1.85 I-P M-I LI LI Zone Consolidation
380250052 1.00 I-P M-I BP LI Zone Consolidation
380250053 1.66 I-P M-I BP LI Zone Consolidation
380250054 1.71 I-P M-I BP LI Zone Consolidation
380250055 1.67 I-P M-I BP LI Zone Consolidation
380250056 1.59 I-P M-I BP LI Zone Consolidation
380250057 18.37 I-P M-I BP LI Zone Consolidation
380260032 0.21 I-P M-I LI LI Zone Consolidation
380260040 5.54 I-P M-I LI LI Zone Consolidation
367140023 3.58 I-P M-I BP BP Zone Consolidation
367140024 3.32 I-P M-I BP BP Zone Consolidation
367140025 1.01 I-P M-I BP BP Zone Consolidation
367140026 0.73 I-P M-I BP BP Zone Consolidation
367140028 0.16 I-P M-I BP BP Zone Consolidation
362240035 5.19 M-SC M-I BP LI Zone Consolidation
362250021 2.52 M-SC M-I BP LI Zone Consolidation
362250022 2.41 M-SC M-I BP LI Zone Consolidation
362250023 2.02 M-SC M-I BP LI Zone Consolidation
362250024 3.09 M-SC M-I BP LI Zone Consolidation
367020037 1.09 M-SC M-I LI LI Zone Consolidation
367020038 2.33 M-SC M-I LI LI Zone Consolidation
367020039 5.04 M-SC M-I LI LI Zone Consolidation
367020040 3.44 M-SC M-I LI LI Zone Consolidation
367020041 0.86 M-SC M-I LI LI Zone Consolidation
367020042 1.40 M-SC M-I LI LI Zone Consolidation
367300001 5.19 M-SC M-I LI LI Zone Consolidation
367300025 2.20 M-SC M-I LI LI Zone Consolidation
367300026 2.36 M-SC M-I LI LI Zone Consolidation
367300027 2.36 M-SC M-I LI LI Zone Consolidation
3419
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
367300028 2.22 M-SC M-I LI LI Zone Consolidation
367300029 1.88 M-SC M-I LI LI Zone Consolidation
367300030 2.10 M-SC M-I LI LI Zone Consolidation
370060018 4.55 M-SC M-I LI LI Zone Consolidation
370060019 1.89 M-SC M-I LI LI Zone Consolidation
370060032 2.22 M-SC M-I LI LI Zone Consolidation
370060045 2.54 M-SC M-I LI LI Zone Consolidation
370060046 0.43 M-SC M-I LI LI Zone Consolidation
370060047 4.84 M-SC M-I LI LI Zone Consolidation
370060048 3.75 M-SC M-I LI LI Zone Consolidation
370090030 0.06 M-SC M-I LI LI Zone Consolidation
370090036 7.23 M-SC M-I LI LI Zone Consolidation
370090037 0.06 M-SC M-I LI LI Zone Consolidation
370090038 4.74 M-SC M-I LI LI Zone Consolidation
370090039 3.72 M-SC M-I LI LI Zone Consolidation
370340001 3.60 M-SC M-I LI LI Zone Consolidation
380260033 2.69 M-SC M-I LI LI Zone Consolidation
380260034 2.72 M-SC M-I LI LI Zone Consolidation
380260035 4.19 M-SC M-I LI LI Zone Consolidation
380260036 3.27 M-SC M-I LI LI Zone Consolidation
380260038 18.06 M-SC M-I LI LI Zone Consolidation
380280005 2.29 M-SC M-I LI LI Zone Consolidation
380280006 3.43 M-SC M-I LI LI Zone Consolidation
380280007 2.98 M-SC M-I LI LI Zone Consolidation
380290008 1.24 M-SC M-I BP LI Zone Consolidation
380290009 1.03 M-SC M-I BP LI Zone Consolidation
380290010 1.03 M-SC M-I BP LI Zone Consolidation
380290011 1.03 M-SC M-I BP LI Zone Consolidation
380290012 2.27 M-SC M-I BP LI Zone Consolidation
380290013 2.28 M-SC M-I BP LI Zone Consolidation
380290030 8.71 M-SC M-I BP LI Zone Consolidation
380290041 4.44 M-SC M-I BP LI Zone Consolidation
380290042 9.36 M-SC M-I BP LI Zone Consolidation
380250044 10.70 R-3 M-I BP LI Zone Consolidation
370060017 1.52 R-R M-I CR LI Zone Consolidation
370090032 0.50 R-R M-I CR LI Zone Consolidation
366401003 0.21 R-1 R-1 MDR MDR Zone Consolidation
368330001 0.26 R-1-11000 R-1 MDR MDR Zone Consolidation 368330002 0.26 R-1-11000 R-1 MDR MDR Zone Consolidation 368330003 0.26 R-1-11000 R-1 MDR MDR Zone Consolidation 368330004 0.26 R-1-11000 R-1 MDR MDR Zone Consolidation 368330005 0.26 R-1-11000 R-1 MDR MDR Zone Consolidation 368330006 0.26 R-1-11000 R-1 MDR MDR Zone Consolidation 368330007 0.26 R-1-11000 R-1 MDR MDR Zone Consolidation 368330008 0.25 R-1-11000 R-1 MDR MDR Zone Consolidation 366341001 1.25 R-1-20000 R-1 MDR MDR Zone Consolidation 366341002 0.47 R-1-20000 R-1 MDR MDR Zone Consolidation 366341003 0.47 R-1-20000 R-1 MDR MDR Zone Consolidation 366341004 0.46 R-1-20000 R-1 MDR MDR Zone Consolidation 366341005 0.46 R-1-20000 R-1 MDR MDR Zone Consolidation 366341006 0.46 R-1-20000 R-1 MDR MDR Zone Consolidation 366341007 0.47 R-1-20000 R-1 MDR MDR Zone Consolidation 366341008 0.73 R-1-20000 R-1 MDR MDR Zone Consolidation 3420
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
366342001 0.46 R-1-20000 R-1 MDR MDR Zone Consolidation 366342002 0.46 R-1-20000 R-1 MDR MDR Zone Consolidation 366342003 0.47 R-1-20000 R-1 MDR MDR Zone Consolidation 366342004 0.46 R-1-20000 R-1 MDR MDR Zone Consolidation 366342005 0.46 R-1-20000 R-1 MDR MDR Zone Consolidation 366342006 0.46 R-1-20000 R-1 MDR MDR Zone Consolidation 366342007 0.46 R-1-20000 R-1 MDR MDR Zone Consolidation 366342008 0.47 R-1-20000 R-1 MDR MDR Zone Consolidation 366342009 0.50 R-1-20000 R-1 MDR MDR Zone Consolidation 366342010 0.48 R-1-20000 R-1 MDR MDR Zone Consolidation 366342011 0.47 R-1-20000 R-1 MDR MDR Zone Consolidation 366342012 0.49 R-1-20000 R-1 MDR MDR Zone Consolidation 366351001 0.55 R-1-20000 R-1 MDR MDR Zone Consolidation 366351002 0.49 R-1-20000 R-1 MDR MDR Zone Consolidation 366351003 0.46 R-1-20000 R-1 MDR MDR Zone Consolidation 366351004 0.46 R-1-20000 R-1 MDR MDR Zone Consolidation 366351005 0.46 R-1-20000 R-1 MDR MDR Zone Consolidation 366351006 0.46 R-1-20000 R-1 MDR MDR Zone Consolidation 366351007 0.46 R-1-20000 R-1 MDR MDR Zone Consolidation 366351008 0.46 R-1-20000 R-1 MDR MDR Zone Consolidation 366351009 0.46 R-1-20000 R-1 MDR MDR Zone Consolidation 366351010 0.46 R-1-20000 R-1 MDR MDR Zone Consolidation 366351011 0.46 R-1-20000 R-1 MDR MDR Zone Consolidation 366351012 0.47 R-1-20000 R-1 MDR MDR Zone Consolidation 366351013 0.46 R-1-20000 R-1 MDR MDR Zone Consolidation 366351014 0.98 R-1-20000 R-1 MDR MDR Zone Consolidation 366351015 1.04 R-1-20000 R-1 MDR MDR Zone Consolidation 366351016 0.47 R-1-20000 R-1 MDR MDR Zone Consolidation 366351017 0.46 R-1-20000 R-1 MDR MDR Zone Consolidation 366351018 0.46 R-1-20000 R-1 MDR MDR Zone Consolidation 366351019 0.46 R-1-20000 R-1 MDR MDR Zone Consolidation 366351020 0.46 R-1-20000 R-1 MDR MDR Zone Consolidation 366351021 0.46 R-1-20000 R-1 MDR MDR Zone Consolidation 366352001 0.46 R-1-20000 R-1 MDR MDR Zone Consolidation 366352002 0.46 R-1-20000 R-1 MDR MDR Zone Consolidation 366352003 0.46 R-1-20000 R-1 MDR MDR Zone Consolidation 366352004 0.46 R-1-20000 R-1 MDR MDR Zone Consolidation 366352005 0.46 R-1-20000 R-1 MDR MDR Zone Consolidation 366352006 0.48 R-1-20000 R-1 MDR MDR Zone Consolidation 366352007 0.49 R-1-20000 R-1 MDR MDR Zone Consolidation 366352008 0.46 R-1-20000 R-1 MDR MDR Zone Consolidation 366352009 0.46 R-1-20000 R-1 MDR MDR Zone Consolidation 366352010 0.46 R-1-20000 R-1 MDR MDR Zone Consolidation 366352011 0.46 R-1-20000 R-1 MDR MDR Zone Consolidation 366352012 0.46 R-1-20000 R-1 MDR MDR Zone Consolidation 366353001 0.60 R-1-20000 R-1 MDR MDR Zone Consolidation 366353002 0.49 R-1-20000 R-1 MDR MDR Zone Consolidation 366353003 0.48 R-1-20000 R-1 MDR MDR Zone Consolidation 366353005 0.48 R-1-20000 R-1 MDR MDR Zone Consolidation 366353006 0.46 R-1-20000 R-1 MDR MDR Zone Consolidation 366353007 0.46 R-1-20000 R-1 MDR MDR Zone Consolidation 366353008 0.46 R-1-20000 R-1 MDR MDR Zone Consolidation 366353009 0.46 R-1-20000 R-1 MDR MDR Zone Consolidation 3421
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
366353010 0.46 R-1-20000 R-1 MDR MDR Zone Consolidation 366361001 0.62 R-1-20000 R-1 MDR MDR Zone Consolidation 366361002 0.62 R-1-20000 R-1 MDR MDR Zone Consolidation 366361003 0.53 R-1-20000 R-1 MDR MDR Zone Consolidation 366361004 0.49 R-1-20000 R-1 MDR MDR Zone Consolidation 366361005 0.53 R-1-20000 R-1 MDR MDR Zone Consolidation 366361006 0.54 R-1-20000 R-1 MDR MDR Zone Consolidation 366361007 0.52 R-1-20000 R-1 MDR MDR Zone Consolidation 366361008 0.63 R-1-20000 R-1 MDR MDR Zone Consolidation 366362001 0.45 R-1-20000 R-1 MDR MDR Zone Consolidation 366362002 0.48 R-1-20000 R-1 MDR MDR Zone Consolidation 366362003 0.53 R-1-20000 R-1 MDR MDR Zone Consolidation 366362004 0.59 R-1-20000 R-1 MDR MDR Zone Consolidation 366362005 0.46 R-1-20000 R-1 MDR MDR Zone Consolidation 366362006 0.46 R-1-20000 R-1 MDR MDR Zone Consolidation 366362007 0.46 R-1-20000 R-1 MDR MDR Zone Consolidation 366362008 0.47 R-1-20000 R-1 MDR MDR Zone Consolidation 366362009 0.47 R-1-20000 R-1 MDR MDR Zone Consolidation 366362010 0.48 R-1-20000 R-1 MDR MDR Zone Consolidation 366362011 0.58 R-1-20000 R-1 MDR MDR Zone Consolidation 366362012 0.45 R-1-20000 R-1 MDR MDR Zone Consolidation 366362013 0.47 R-1-20000 R-1 MDR MDR Zone Consolidation 366362014 0.47 R-1-20000 R-1 MDR MDR Zone Consolidation 366362015 0.49 R-1-20000 R-1 MDR MDR Zone Consolidation 366371001 0.49 R-1-20000 R-1 MDR MDR Zone Consolidation 366371002 0.49 R-1-20000 R-1 MDR MDR Zone Consolidation 366371003 0.57 R-1-20000 R-1 MDR MDR Zone Consolidation 366371004 0.53 R-1-20000 R-1 MDR MDR Zone Consolidation 366371005 0.46 R-1-20000 R-1 MDR MDR Zone Consolidation 366371006 0.46 R-1-20000 R-1 MDR MDR Zone Consolidation 366372001 0.46 R-1-20000 R-1 MDR MDR Zone Consolidation 366372002 0.46 R-1-20000 R-1 MDR MDR Zone Consolidation 366372003 0.53 R-1-20000 R-1 MDR MDR Zone Consolidation 366372004 0.52 R-1-20000 R-1 MDR MDR Zone Consolidation 366372005 0.46 R-1-20000 R-1 MDR MDR Zone Consolidation 366372006 0.46 R-1-20000 R-1 MDR MDR Zone Consolidation 366373001 0.46 R-1-20000 R-1 MDR MDR Zone Consolidation 366373002 0.46 R-1-20000 R-1 MDR MDR Zone Consolidation 366373003 0.46 R-1-20000 R-1 MDR MDR Zone Consolidation 366373004 0.55 R-1-20000 R-1 MDR MDR Zone Consolidation 366373005 0.86 R-1-20000 R-1 MDR MDR Zone Consolidation 366373006 0.55 R-1-20000 R-1 MDR MDR Zone Consolidation 366373007 0.47 R-1-20000 R-1 MDR MDR Zone Consolidation 366373008 0.46 R-1-20000 R-1 MDR MDR Zone Consolidation 366373009 0.46 R-1-20000 R-1 MDR MDR Zone Consolidation 366373010 0.46 R-1-20000 R-1 MDR MDR Zone Consolidation 366373011 0.46 R-1-20000 R-1 MDR MDR Zone Consolidation 366373012 0.46 R-1-20000 R-1 MDR MDR Zone Consolidation 366373013 0.46 R-1-20000 R-1 MDR MDR Zone Consolidation 366373014 0.46 R-1-20000 R-1 MDR MDR Zone Consolidation 366373015 0.46 R-1-20000 R-1 MDR MDR Zone Consolidation 366373016 0.46 R-1-20000 R-1 MDR MDR Zone Consolidation 366373017 0.50 R-1-20000 R-1 MDR MDR Zone Consolidation 3422
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
366380001 0.53 R-1-20000 R-1 MDR MDR Zone Consolidation 366380002 0.51 R-1-20000 R-1 MDR MDR Zone Consolidation 366380003 0.51 R-1-20000 R-1 MDR MDR Zone Consolidation 366380004 0.49 R-1-20000 R-1 MDR MDR Zone Consolidation 366380005 0.56 R-1-20000 R-1 MDR MDR Zone Consolidation 366380006 0.55 R-1-20000 R-1 MDR MDR Zone Consolidation 366380007 0.56 R-1-20000 R-1 MDR MDR Zone Consolidation 366380008 0.54 R-1-20000 R-1 MDR MDR Zone Consolidation 366380009 0.47 R-1-20000 R-1 MDR MDR Zone Consolidation 366380010 0.47 R-1-20000 R-1 MDR MDR Zone Consolidation 366380011 0.64 R-1-20000 R-1 MDR MDR Zone Consolidation 366380012 0.50 R-1-20000 R-1 MDR MDR Zone Consolidation 366380013 0.44 R-1-20000 R-1 MDR MDR Zone Consolidation 366380014 0.44 R-1-20000 R-1 MDR MDR Zone Consolidation 366380015 0.45 R-1-20000 R-1 MDR MDR Zone Consolidation 366390002 0.44 R-1-20000 R-1 MDR MDR Zone Consolidation 366390003 0.43 R-1-20000 R-1 MDR MDR Zone Consolidation 366390004 0.45 R-1-20000 R-1 MDR MDR Zone Consolidation 366390005 0.42 R-1-20000 R-1 MDR MDR Zone Consolidation 366390006 0.45 R-1-20000 R-1 MDR MDR Zone Consolidation 366390007 0.57 R-1-20000 R-1 MDR MDR Zone Consolidation 366390008 0.46 R-1-20000 R-1 MDR MDR Zone Consolidation 366390009 0.60 R-1-20000 R-1 MDR MDR Zone Consolidation 366390010 0.43 R-1-20000 R-1 MDR MDR Zone Consolidation 366390011 0.42 R-1-20000 R-1 MDR MDR Zone Consolidation 366390012 0.47 R-1-20000 R-1 MDR MDR Zone Consolidation 366390013 0.55 R-1-20000 R-1 MDR MDR Zone Consolidation 366390014 0.47 R-1-20000 R-1 MDR MDR Zone Consolidation 366390015 0.44 R-1-20000 R-1 MDR MDR Zone Consolidation 366390016 0.44 R-1-20000 R-1 MDR MDR Zone Consolidation 366390017 0.44 R-1-20000 R-1 MDR MDR Zone Consolidation 366480044 0.56 R-1-20000 R-1 MDR MDR Zone Consolidation 366480045 0.36 R-1-20000 R-1 MDR MDR Zone Consolidation 366480046 0.36 R-1-20000 R-1 MDR MDR Zone Consolidation 366480047 0.36 R-1-20000 R-1 MDR MDR Zone Consolidation 366480048 0.78 R-1-20000 R-1 MDR MDR Zone Consolidation 366480049 1.08 R-1-20000 R-1 MDR MDR Zone Consolidation 366480050 1.14 R-1-20000 R-1 MDR MDR Zone Consolidation 366480051 0.64 R-1-20000 R-1 MDR MDR Zone Consolidation 366480052 0.31 R-1-20000 R-1 MDR MDR Zone Consolidation 366480053 0.35 R-1-20000 R-1 MDR MDR Zone Consolidation 366480054 0.36 R-1-20000 R-1 MDR MDR Zone Consolidation 366480055 0.43 R-1-20000 R-1 MDR MDR Zone Consolidation 366480056 0.05 R-1-20000 R-1 MDR MDR Zone Consolidation 368331001 0.19 R-1-8000 R-1 MDR MDR Zone Consolidation
368331002 0.18 R-1-8000 R-1 MDR MDR Zone Consolidation
368331003 0.18 R-1-8000 R-1 MDR MDR Zone Consolidation
368331004 0.18 R-1-8000 R-1 MDR MDR Zone Consolidation
368331005 0.18 R-1-8000 R-1 MDR MDR Zone Consolidation
368331006 0.18 R-1-8000 R-1 MDR MDR Zone Consolidation
368331007 0.18 R-1-8000 R-1 MDR MDR Zone Consolidation
368331008 0.18 R-1-8000 R-1 MDR MDR Zone Consolidation
368331009 0.18 R-1-8000 R-1 MDR MDR Zone Consolidation
3423
APN Acres Existing
Zoning
Proposed
Zoning
Existing
GPLU
Proposed
GPLU Reason for change
368331010 0.21 R-1-8000 R-1 MDR MDR Zone Consolidation
368331011 0.22 R-1-8000 R-1 MDR MDR Zone Consolidation
368331012 0.22 R-1-8000 R-1 MDR MDR Zone Consolidation
368331013 0.20 R-1-8000 R-1 MDR MDR Zone Consolidation
368331014 0.18 R-1-8000 R-1 MDR MDR Zone Consolidation
368331015 0.18 R-1-8000 R-1 MDR MDR Zone Consolidation
368331016 0.18 R-1-8000 R-1 MDR MDR Zone Consolidation
368331017 0.18 R-1-8000 R-1 MDR MDR Zone Consolidation
368331018 0.18 R-1-8000 R-1 MDR MDR Zone Consolidation
368331019 0.18 R-1-8000 R-1 MDR MDR Zone Consolidation
368331020 0.18 R-1-8000 R-1 MDR MDR Zone Consolidation
368331021 0.18 R-1-8000 R-1 MDR MDR Zone Consolidation
368331022 0.20 R-1-8000 R-1 MDR MDR Zone Consolidation
368331023 0.20 R-1-8000 R-1 MDR MDR Zone Consolidation
368331024 0.18 R-1-8000 R-1 MDR MDR Zone Consolidation
368331025 0.18 R-1-8000 R-1 MDR MDR Zone Consolidation
368331026 0.18 R-1-8000 R-1 MDR MDR Zone Consolidation
368331027 0.18 R-1-8000 R-1 MDR MDR Zone Consolidation
368331028 0.18 R-1-8000 R-1 MDR MDR Zone Consolidation
368331029 0.18 R-1-8000 R-1 MDR MDR Zone Consolidation
368331030 0.18 R-1-8000 R-1 MDR MDR Zone Consolidation
368331031 0.19 R-1-8000 R-1 MDR MDR Zone Consolidation
368331032 0.18 R-1-8000 R-1 MDR MDR Zone Consolidation
368331033 0.20 R-1-8000 R-1 MDR MDR Zone Consolidation
368331034 0.23 R-1-8000 R-1 MDR MDR Zone Consolidation
368331035 0.19 R-1-8000 R-1 MDR MDR Zone Consolidation
368331036 0.18 R-1-8000 R-1 MDR MDR Zone Consolidation
368331037 0.18 R-1-8000 R-1 MDR MDR Zone Consolidation
368331038 0.18 R-1-8000 R-1 MDR MDR Zone Consolidation
368331039 0.18 R-1-8000 R-1 MDR MDR Zone Consolidation
368331040 0.18 R-1-8000 R-1 MDR MDR Zone Consolidation
368331041 0.18 R-1-8000 R-1 MDR MDR Zone Consolidation
368331042 0.18 R-1-8000 R-1 MDR MDR Zone Consolidation
368331043 0.18 R-1-8000 R-1 MDR MDR Zone Consolidation
368331044 0.20 R-1-8000 R-1 MDR MDR Zone Consolidation
368331047 0.46 R-A-20000 R-1 MDR MDR Zone Consolidation 368331048 0.46 R-A-20000 R-1 MDR MDR Zone Consolidation 368331052 0.51 R-A-20000 R-1 MDR MDR Zone Consolidation 365250060 10.00 R-A-5 R-A RR LLR Zone Consolidation
3424
City of Wildomar General Plan Update | 1

Envision Wildomar 2040
Pop-Up #1: Coffee with the City
June 14th, 2022
8:30-9:30 AM

OVERVIEW
The first community pop-up for the City of Wildomar’s General Plan Update was held on June 14th, 2022, from 8:30 – 9:30am at the Corporate Room. The Pop-up occurred as part of the Murrieta/Wildomar Chamber of Commerce’s Coffee with the City, which is hosted monthly and open to the public. The agenda for the meeting included a presentation by the consultant team providing an overview of the General Plan and overview of the public outreach plan for the project.

Following the presentation, attendees completed a Strength, Weaknesses, Opportunities, & Threats (SWOT) exercise. Key takeaways from the SWOT exercise are shown below. Complete responses are included in an appendix to this summary.

SWOT Analysis
Strengths
• Small town rural area feel
• High level of civic and community engagement
• Beautiful and scenic
• A lot of land for growth and large home parcels
Weaknesses
• Infrastructure (roads, water and sewer system)
• There is not enough streetscape in the city
• There needs to be more open spaces, recreational spaces and outdoor activities • Lack of a central business district
• Needs more retail
• More Public services ( School, healthcare)
Opportunities
• More commercial opportunities
• Control density and population growth
• Bringing in more jobs
Threats
• State regulations and mandates
• Traffic
• Becoming a larger city
3425
3426
3427
3428
3429
3430
3431
3432
3433
3434
3435
3436
3437
3438
City of Wildomar General Plan Update | 1

Envision Wildomar 2040
Pop-Up #2: Wildomar’s 14th Birthday Celebration
Marna O’Brien Park
July 9th, 2022
6-9 PM

OVERVIEW
The second community pop-up for the City of Wildomar’s General Plan Update was held on July 9th, 2022, from 6 – 9PM at Marna O’Brien Park. The Pop-up occurred as part of Wildomar’s 14th Birthday Celebration event. The event included multiple public and private vendors, a stage with performances, and was attended by the larger Wildomar community. The pop-up included a booth with project fact sheet takeaway flyers and engaged community members with a birthday card activity. Community members were asked to wish Wildomar a happy birthday by filling out a birthday card. The birthday cards had prompts for participants to fill in how many years they have known the City of Wildomar, their favorite thing about the city, and their birthday wish for the city over the next 20 years. In the spirit of the Wildomar’s birthday, helium filled balloons were given out to participants and children. A summary of key takeaways of completed birthday cards are shown below. Complete responses are included in an appendix to this summary.

Summary of Responses
• 45 Total Birthday Card responses.

What’s your favorite thing about the city?
Responses were categorized into themes. The top four themes are listed below, followed by their number of occurrences. • Community (14)
• Recreational Open Space (8)
• Small/Rural Feel (8)
• Activities (5)
What’s your birthday wish for Wildomar over the next 20 years? Responses were categorized into themes. The top four themes are listed below, followed by their number of occurrences. • Be sensitive to growth (5)
• More activites / things to do (5)
• Water amenities / splash pads (5)
• More commercial (4)
• Keep the community feel (4)
3439
3440
3441
3442
3443
3444
City of Wildomar General Plan Update | 1

Envision Wildomar 2040
Pop-Up #3: Mariachi Night
Marna O’Brien Park
September 17th, 2022
6-9 PM

OVERVIEW
The third community pop-up for the City of Wildomar’s General Plan Update was held on September 17, 2022, from 6 – 9PM at Marna O’Brien Park. The Pop-up occurred as part of Wildomar’s Mariachi Night event. The event included multiple public and private vendors, a stage with performances, and was attended by the larger Wildomar community. The pop-up included a booth with project fact sheet takeaway flyers and solicited feedback from community members on the draft Guiding Principles. Participants used stickers to vote on whether they agree or disagree with the draft Guiding Principles, and were allowed to provide comments. A summary of feedback received is included below.

Guiding Principles

1. Community Character: Provides a welcoming, safe and family-friendly environment with opportunities for healthy, self-sustaining lifestyles for all residents
a. 51 Agree
b. 0 Disagree

2. Growth, Land Use & Development: Balances responsible growth with preservation of rural character, open spaces and historical resources
a. 45 Agree
b. 0 Disagree

3. Infrastructure & Services: Provides for social, physical and mental health through arts and programs, entertainment, recreational opportunities, quality infrastructure and gathering places for residents of all ages and abilities
a. 50 Agree
b. 2 Disagree

4. Economic Health: Nurtures small businesses, attracts high-quality jobs, provides quality educational opportunities and commercial services that capture local spending and generate revenues to support Wildomar’s vision for the future
a. 43 Agree
b. 3 Disagree

5. Environment: Protects the visual and ecological value of its natural resources a. 50 Agree
b. 0 Disagree

6. Mobility: Maintains safe roadways and high-quality pedestrian, bicycle, multi-purpose trail and transit networks a. 43 Agree
b. 3 Disagree
3445
Wildomar’s General Plan Update – COMMUNITY WORKSHOP #1 SUMMARY | 1

Envision Wildomar 2040: The City of Wildomar’s General Plan Update

CITYWIDE WORKSHOP SUMMARY
Workshop #1

Date/Time: Thursday, July 14, 2022, 6:00-8:00 pm (in person) & Tuesday, July 19, 6:00-8:00pm (virtual) Format: The Corporate Room (in person) & Zoom (virtual)

OVERVIEW
In July 2022, the City of Wildomar hosted the first citywide workshops to solicit input from the community on the update of the City’s General Plan. An in-person workshop held at the Corporate Room on July 14th was attended by approximately 15-20 community members. A virtual workshop, covering the same content, was hosted on Zoom on July 19th and attracted 18 community members.

Both workshops began with a welcome, followed by a PowerPoint presentation that included an overview of the General Plan update project, and the interactive activities being facilitated that evening. These activities consisted of four workshop stations: Let’s Envision Wildomar, What’s Missing?, How Does Wildomar Move? and What Do You Love About Wildomar?
At the end of the presentation, community members were directed to the project website (envisionwildomar2040.com) to learn more about the General Plan update.

Attendees at the in-person event were invited to participate in each activity in an Open House Format. Those who attended the workshop virtually participated in each activity as a group in breakout rooms on the Zoom video conference platform. Each attendee for the in-person and virtual workshop had the opportunity to engage with the information for each activity, ask staff members clarifying questions and provide their input on the future of Wildomar through various commenting formats.

The comments collected at both of these events are summarized below and all of the comments submitted by participants are included as an Appendix to this report.

3446
Wildomar’s General Plan Update – COMMUNITY WORKSHOP #1 SUMMARY | 2

KEY TAKEAWAYS
Station 1: Let’s Envision Wildomar
Description: For the in-person version of this activity participants were asked to use dots to indicate on a map of the city where they lived, where they liked to shop, eat, etc. and where they thought the heart of Wildomar was. For the virtual version of this activity participants were asked to identify where they thought the heart of the city was located and input was taken down with virtual sticky notes.

For the in-person portion, the number in the parenthesis indicate how many times a dot was placed in a certain area on the map. For the virtual portion, the number in the parenthesis indicate the number of times a topic was mentioned on the virtual sticky notes.

In Person Virtual (were not asked to identify home and
activity areas)
 Community members tend to spend their leisure
time near the intersection of Clinton Keith Road
and the 15 freeway which is on the opposite end of
Wildomar from where most of the attendees
indicated they live. At this intersection, there are a
variety of eateries and shops to support some of
the everyday needs of residents (10)
 Majority of the areas suggested for the heart of the
city are located at the intersection of Wildomar Tr.
and Palomar St. which is where the Elementary
school is located along with post office, the historic
bell, transit stops, a market, eateries and stores to
support everyday needs (5)
 Participants in the virtual workshop identified two
general areas- the intersection of Clinton Keith and
the 15 freeway and the intersection of Wildomar
Trail and Palomar St. – as being/having potential to
be the heart of the city (6)
3447
Wildomar’s General Plan Update – COMMUNITY WORKSHOP #1 SUMMARY | 3 Station 2: What’s Missing
Land Use Map
Description: For both the in-person and virtual versions of this activity, participants were asked to share what they thought Wildomar was missing in terms of housing type and quantity, employment opportunities, shopping and services, dining and entertainment, and any additional thoughts.

The number in the parenthesis indicate how many times a topic was mentioned in the raw comments.

In Person Virtual
 Performing arts center (4)
 Variety of employment for all (4)
 More opportunities for small business (retail, dining, entertainment) (3)
 There is a need for affordable housing for families and seniors (3)
 A civic center is wanted (2)
 A larger library that provides a variety of services is needed (2)
 More recreational activities (2)

 Concerns in housing that is higher in density; wants
to maintain rural feel of the area (5)
 Want to see better infrastructure as the city begins
to grow (3)
 Would like to see some remanence of the Old Town
vision (2)
 Want to see implementation of areas that allow for
residents to linger around. (2)
 Need more fun activities to do for adults and kids
(2)
 A better mix of small businesses and larger
franchise businesses (2)

Open Space
Description: In this activity, participants were asked “What makes open space special in Wildomar?” To help guide the discussion, three categories were provided, along with a fourth open ended option. The categories included: places for recreation and nature, protection of plants and animals, and beautiful views. Participants could write in their response or add a dot sticker to vote for a category.

The number in the parenthesis indicate how many times a topic was mentioned in the raw comments or how many dots were placed under a topic.

In Person Virtual (Did not do dot portion)
 Recreation in nature (5)
 Beautiful views (5)
 Protection of plants & animals (4)
 Hiking trails with an opportunity to learn about the
nature would make Wildomar’s open space special
(2)
 Beautiful views consist of mountains and forest (2)
 Emphasize the importance of needing open space
(5)
 Want to see more trails for pedestrian and horse
use (4)
 Implementation of ordinances to control lighting in
the city to preserve the dark skies at night (2)

3448
Wildomar’s General Plan Update – COMMUNITY WORKSHOP #1 SUMMARY | 4 Parks & Recreation
Description: For the in-person and virtual activity, participants were asked “What types of Parks and Recreation do you want to see in Wildomar? Six categories were provided for people to vote on and discuss. An “other” option was also provided for other ideas.

The number in the parenthesis indicate how many times a topic was mentioned in the raw comments or how many dots were placed under a topic
In Person Virtual (Did not do dot portion)
 Trails (5)
 Outdoor performance spaces (4)
 Outdoor gathering spaces (3)
 Sports field (2)
 Playgrounds (2)
 Residents are engaged with the outdoors
however, additional things such as opportunities
to learn about nature would make the experience
better (2)
 There is a need for a formal performance area other
than a park (4)
 There is a need for event spaces, large venues, and a civic center (4)
 Connect existing trails together (2)
 More shaded areas in parks (2)
 Off road biking and biking trails (2)

Station 3: How Does Wildomar Move?
Description: For the in person and virtual versions of this activity, participants were asked how they get around the city and the challenges they encounter in walking, biking, taking transit, or driving in the city. For the in-person activity, responses were written down on sticky notes and placed on the map.

The number in the parenthesis indicate how many times a topic was mentioned in the raw comments.

In Person Virtual
 Comments made on the map generally focus on
increasing pedestrian safety in certain areas (6)
 There is a high concentration of comments made
along Palomar St. (4) as well as Clinton Keith Road
(4)
 Majority of the concerns are along Palomar St. (4)
 Would like to see some resemblance of the old town
vision in the city (2)

3449
Wildomar’s General Plan Update – COMMUNITY WORKSHOP #1 SUMMARY | 5

Station 4: What Do you Love About Wildomar?
Description: For the in-person version of this activity, participants took photos holding up a whiteboard with what they love about Wildomar written on it. For the virtual version of this activity, participants shared what they love about Wildomar and their responses were recorded using virtual sticky notes.

The number in the parenthesis indicate how many times a topic was mentioned in the raw comments.

In Person Virtual
 The people are friendly (3)
 Access to the trails (3)
 Enjoy the peace (2)
 Residents enjoy the rural feel Wildomar offers (5)
 The people are nice, welcoming and care for each
other (3)

3450
Wildomar’s General Plan Update – Workshop #2 SUMMARY | 1

Envision Wildomar 2040
Citywide Workshop #2 Summary

OVERVIEW
The second Citywide Workshop for Wildomar’s General Plan update was held in-person at the Corporate Room on November 10, 2022 and virtually via Zoom on November 15, 2022. The in-person workshop had 21 attendees and the virtual workshop had 18 attendees. The in-person and virtual workshops covered the same content and included a presentation followed by engagement activities to solicit input on the General Plan’s draft land use concepts and guiding principles. The presentation included a brief overview of the General Plan Update project, discussion on preliminary land use changes, and an explanation of how focus areas were identified.

At the in-person workshop, three stations were available for participants to interact with in an open house format. The station activities were replicated in the virtual workshop as breakout room discussions with Jamboard. Station 1 asked whether community members agree or disagree with the draft Guiding Principles that will lay the framework for the General Plan. Station 2 provided info on preliminary administrative land use changes, updated land use designation descriptions and example imagery for each land use designation. Station 3 solicited input on what land uses should be encouraged for each of the 9 focus areas. For each focus area, key considerations and land use concepts were presented for the community to weigh in on.

KEY TAKEWAYS
Feedback on the Guiding Principles from the in-person workshop was unanimous with 7 votes agreeing and no votes disagreeing. During the virtual workshop, the majority of participants agreed with all guiding principles. The number of participants disagreeing with each guiding principles ranged from 1-3 in the virtual workshop. Comments from those who disagreed raised concerns about not having proper infrastructure, lack of access to open space and parks, and conserving historic resources. Final tally of votes for each guiding principle are included below. Specific comments are included in the appendix following the summary.

Community members had general agreement on preferred land use concepts for each Focus Area. Focus Area 1 and Focus Area 2 had equal or close to equal votes for land use concepts presented. Comments made by participants regarding Focus Areas pertained to incorporating more diverse commercial retail, infrastructure improvement, and community amenities such as green/open spaces and gathering spaces. A summary of votes for land use concepts for each focus area are included below. Photos of the workshop boards, and virtual Jamboards are included as an appendix.

SUMMARY OF RESULTS
Guiding Principles

1. Community Character: Provides a welcoming, safe and family-friendly environment with opportunities for healthy, self-sustaining lifestyles for all residents
a. 17 Agree
b. 2 Disagree

2. Growth, Land Use & Development: Balances responsible growth with preservation of rural character, open spaces and historical resources
a. 16 Agree
b. 3 Disagree
3451
Wildomar’s General Plan Update – COMMUNITY WORKSHOP #2 SUMMARY | 2

3. Infrastructure & Services: Provides for social, physical and mental health through arts and programs, entertainment, recreational opportunities, quality infrastructure and gathering places for residents of all ages and abilities
a. 17 Agree
b. 1 Disagree

4. Economic Health: Nurtures small businesses, attracts high-quality jobs, provides quality educational opportunities and commercial services that capture local spending and generate revenues to support Wildomar’s vision for the future
a. 18 Agree
b. 1 Disagree

5. Environment: Protects the visual and ecological value of its natural resources a. 17 Agree
b. 1 Disagree

6. Mobility: Maintains safe roadways and high-quality pedestrian, bicycle, multi-purpose trail and transit networks a. 17 Agree
b. 1 Disagree
Focus Areas

1. Focus Area 1
a. Concept A: Higher Density Residential: 3 Votes
b. Concept B: Lower Density Residential: 13 Votes
c. Concept C: Mixed-Use: 4 Votes

2. Focus Area 2
a. Concept A: All Residential 11 Votes
b. Concept B: Mixed-Use 4 Votes

3. Focus Area 3
a. Concept A: Commercial Center: 13 Votes
b. Concept B: Mixed-Use: 4 Votes

4. Focus Area 4
a. Concept A Commercial Use with Events & Community Space: 14 Votes b. Concept B: Mixed-Use: 0 Votes

5. Focus Area 5
a. Concept A: Primarily Commercial Uses: 9 Votes
b. Concept B: Allow a Mix of Uses: 4 Votes

6. Focus Area 6
a. Concept A: Mixed-Use: 8 Votes
b. Concept B: Residential: 7 Votes

7. Focus Area 7
a. Concept Commercial Center: 11 Votes
b. Concept B: Mixed-Use: 3 Votes
3452
Wildomar’s General Plan Update – COMMUNITY WORKSHOP #2 SUMMARY | 3

8. Focus Area 8
a. Concept A: Industrial Flex: 8 Votes
b. Concept B: Traditional Office: 3 Votes

9. Focus Area 9
a. Concept A: Residential: 10 Votes
b. Concept B: Commercial: 5 Votes

10. Additional Comments

• Incorporate staging areas for trais on the Trails Mater Plan • Designate as a wildlife corridor and connect the areas 3453
3454
3455
3456
3457
3458
3459
3460
3461
3462
3463
3464
3465
3466
3467
3468
3469
3470
3471
3472
3473
3474
3475
3476
3477
3478
3479
3480
3481
3482
3483
3484
3485
3486
3487
3488
3489
3490
3491
3492
3493
3494
3495
3496
3497
3498
3499
3500
3501
3502
3503
3504
3505
3506
3507
3508
3509
3510
3511
3512
3513
3514
3515
3516
3517
3518
3519
3520
3521
3522
3523
3524
3525

Wildomar’s General Plan Update – Survey #1 SUMMARY | 1

Envision Wildomar 2040
Let’s Envision Wildomar Survey Summary

CURRENT VISION STATMENT
“The City of Wildomar will be a safe and active community with responsible growth and quality infrastructure while keeping a hometown feel.”
- City Council Adopted Vision Statement (February 2017)

OVERVIEW
The Let’s Envision Wildomar Survey was conducted over an 8-week period to capture community values, concerns, and aspirations for the City of Wildomar over the next 20 years. Community responses to the survey will be used to craft the General Plan Vision Statement and ensure that the General Plan Update reflects the values of the community. The survey was available online in English and Spanish from June 13, 2022 to August 7, 2022. The survey was promoted on the Envision Wildomar 2040 project website, through the City’s weekly email listserv, City Facebook page, and shared by the Murrieta/Wildomar Chamber of Commerce. The survey was also promoted at two in-person pop-up events, including the Chamber’s Coffee with the City on June 14, 2022 at the Corporate Room and Wildomar’s 14th Birthday Celebration on July 9, 2022 at Marna O’ Brien Park. The survey included four questions followed by optional demographic questions. The following summarizes community responses to each question. Responses to each question were organized into themes.

The top 10 themes are shown for each question, followed by the number of times each theme appeared for each question. Complete survey responses are included in an appendix to this summary. 222 Total Survey Responses
Q1: What do you like about Wildomar? (Use 3 words or phrases) Words Count Rank
Small Town 78 1
Rural 70 2
Proximity to goods/services 34 3
Quiet 31 4
Friendly 31 4
Open Space 30 5
Community 26 6
No Traffic 17 7
Affordable 16 8
Safe 16 8
Freeway access 14 9
Family Oriented 13 10
3533
Wildomar’s General Plan Update – COMMUNITY WORKSHOP #1 SUMMARY | 2 Q2: What challenges face the City of Wildomar? (Use 3 words or phrases) Words Count Rank
Infrastructure 92 1
Safety 50 2
Urbanization 48 3
Traffic 44 4
Businesses that reflect community needs 26 5
Homelessness 23 6
Drug use 15 7
Cleanliness 14 8
Timely Development 12 9
Employment for all skill levels 12 9
City Funding 11 10
Q3: What would you like to see more of? (Use 3 words or phrases) Words Count Rank
Community Amenities 70 1
Infrastructure 69 2
Safety measures 50 3
Commercial 40 4
Trails 22 5
Open space 20 6
Community Events 19 7
Restaurants 19 7
Fresh Food options 15 8
less development 13 9
Cleanliness 11 10
Q4: What’s your vision of Wildomar? (Open Ended)
Words Count Rank
Community Amenities 54 1
Rural 44 2
Infrastructure 44 2
Small Town Feel 36 3
Open Space 31 4
Safe 28 5
Less development 28 5
Activities 26 6
Planned Growth 24 7
Cleanliness 22 8
Commercial 19 9
Family Oriented 18 10
3534
Wildomar’s General Plan Update – COMMUNITY WORKSHOP #1 SUMMARY | 3 Summary of Demographic Question Responses
• 96% of responses live in Wildomar’s zip code (92595); 191 Responses • Race / Ethnicity (195 responses)
o White 133 (68%)
o Two or More 24 (23%)
o Hispanic or Latino 18 (9%)
o Other 10 (5%)
o Black or African 3 (1.5%)
o Asian 2 (1%)
•
Age Count Rank Percent
20-29 5 6 2.36%
30-39 34 4 16.04%
40-49 42 2 19.81%
50-59 41 3 19.34%
60-69 58 1 27.36%
70+ 32 5 15.09%
Grand Total 212 100.00%

3535
APPENDIX A: Let's Envision Wildomar Survey Responses 1
What do you like about
Wildomar?
What challenges face the
City of Wildomar?
What would you like to
see more of? What’s your vision for Wildomar? Where do
you live?
What is
your age?
How would you identify your
race/ethnicity?
1 1. Small Town

2. Tranquil

3. Mostly friendly

1. Ever increasing regional
population

2. Too few parks

3. Rude drivers

1. Parks

2. Live entertainment

3. More shopping choices
for non food items
Growth that doesn't outpace infrastructure. Measure twice and cut once. Don't delay important things that will only cost twice as much to do ten years from now. Don't allow freeway billboard sign blight. We need our own police substation, and a community center. We're a small town, so we don't expect all what bigger towns have, but that doesn't mean we want nothing.
92595 50-59
American_Indian_and_Alaska_Nat
i,Asian,Black_or_African_American
,Hispanic_or_Latino,Native_Hawaii
an_and_Other_Pacif,White,Two_o
r_More_of_the_above_Races/
2 1. Local

2. Welcoming

3. Friendly

1. Urbanization

2. Traffic

3. Over developed

1. Coffee shops

2. Bakeries

3. Parks
A small town rural community that is welcoming and friendly and a stop for the weary. It’s a city that connect family and friends in areas that to meet up such as the local coffee shop or park. 92595 30-39 White 3 1.small hometown feel

2.open land, not filled up
with developments

3.Low light pollution

1.maintaining country feel

2.min. growth

3. Get worthy new
businesses

1.more youth programs

2.senior programs

3.Winco
A cohesive, thriving community. Where private & public entities work together to better our community. Promote volunteering both for young & old on community projects. 92595 60-69 Hispanic_or_Latino 4 1. Affordability

2. Close to hospital and
supermarkets

3. Semi-rural lifestyle

1. Traffic

2. Climate change

3. Inflation/expenses

1. Public transit

2. Mixed-use development

3. Active transportation
In 2040, Wildomar will remain one of the fastest-growing cities in California with a population approaching 50,000, but it will remain as vibrant as ever. Inland Valley Medical Center and the shopping centers on Clinton Keith Road will still exist, but there will be more economic development opportunities (such as big-box stores) on Bundy Canyon Road and a tree-lined corridor on Wildomar Trail that leads to a well-defined downtown with eateries and breweries. There will be more frequent bus service to Temecula and Lake Elsinore, more bike lanes and pedestrian trails, well-paved streets, and a rail line along I-15 that stops right in front of the hospital and takes cars off the freeway. The once-proposed Mount San Jacinto College campus will be built and become the most widely-attended in the system. Most importantly, the area’s safety, affordability and natural beauty will be preserved, and it will be a place that people will continue to want to call their home.
92592 20-29 White
5 1. Not overly crowded

2. Lots open space
throughout the City

3. 1. CRIME! LE and/or
RiversideCo officers are not
sufficient. We need our
own dept!

2. Homelessness and drugs

1. Parks and recreation.

Sport parks, pump tracks,
community center w/pool

2. Police presence.

3. Breweries
An open space country living vibe where crime rates are low. I'd like to see more places like parks/recreation for our youth. More businesses/restaurants that provide the City adequate tax revenue to sustain maintenance of City streets and funding for our OWN police department.

Maybe a amphitheater for small festivals or concerts. A community recreation center with a pool that provides year around classes for things like fitness/sports/summer leisure, local team youth activities/summer camps, and senior citizen activities.

Making Wildomar a place where residences can spend their time AND money in the city they live in rather than driving to Temecula or Murrieta for everything worth doing.
92595 30-39
6 1.Where I live, next to a
field.

2.Friendly
neighbors/community.

3.Nature.

1.Bundy Canyon Road
expansion has stalled.

2.More roads/wider roads
needed.

3.Grocery store needed.

1.Grocery Store near Bundy
Canyon Rd.

2.Trade Joe's store.

3.Less home building.

Wildomar has it's beauty from the wildlife and nature in the area. I hope to see this remain by not building it up as much as the neighboring cities. A Trader Joe's store would be welcome. 92595 60-69 White 7 1. The proximity to both
San Diego and OC

2. The mix of open space
and tract homes

3. The weather

1. Growing with a plan

2. Lack of smaller,
affordable homes to buy:
condos, townhomes

3. Need more employers

1. More affordable housing
to buy

2. More businesses to
employ residents

3. Communication from
city official
My vision for Wildomar is that it becomes a welcoming, safe and clean city for all demographics and political ideologies.

I'd like it to be a place where people can buy a home, raise a family if they choose, and send their kids to highly regarded schools. I want retirees to want to live out their lives here and be able to access healthcare and stores. My vision includes neighborhood parks with recreation centers and activities for children and teens. I'd like to see summer programs at the parks like we had in the 1970's: swimming and tennis lessons, art classes, indoor and outdoor organized games and sports. I would also like a dedicated "downtown" area where the city offices are located. 92595 50-59 Black_or_African_American
8 1.Rural

2. 3.

1. Infrastructure

2. Aging water and sewer
system

3. Aging tract home
communities

1. Access to open space

2. Murrieta Creek Trail

3. Remain a rural bedroom community 92595 60-69 other
3536
APPENDIX A: Let's Envision Wildomar Survey Responses 2
What do you like about
Wildomar?
What challenges face the
City of Wildomar?
What would you like to
see more of? What’s your vision for Wildomar? Where do
you live?
What is
your age?
How would you identify your
race/ethnicity?
9 1. rural small community
feel

2. open spaces and hillsides

3. small business friendly

1.overdevelopment

2.housing: density vs city
vision

3.protect small business
while welcoming large corps

1. green belts

2.public parks

3.recreational businesses
providing activities
I love Wildomar's small hometown feel! We have lots of open space and beautiful views we should preserve as part of Wildomar's image. Greenbelts and community parks are an important part of housing developments. Preserving the city's ag/ranch feel while meeting density requirements is a challenge that needs unique solutions. larger lot-size developments that are zoned/suitable for horses/small farms to fit our horse-town image can be balanced with multifamily housing developments. I don't want to become a sea of tract homes like Murrieta! Small business should be prioritized over large out of state corporations; it keeps with the small hometown image and keeps company profits circulating and benefiting our local economy. Attracting businesses that provide unique services not found in neighboring cities will help differentiate ourselves. Creative mixed zoning that allows small markets in residential areas:
decentralizing resources encourages pedestrian activity and reduces traffic 92595 40-49 White
10 1.small town

2. Lived here since
population 800

3. Nice community

1. Code enforcement

2. Too much growth

3. Little league doesn’t
seem to use their budget
for field & kids

1. More fields

2. More code enforcement

3. Street sweepers
No more new houses or commercial buildings. 92595 40-49 White 11 1. A small town feel

2. Relatively open spaces

3. The diversity of residents

1. The roads are terrible

2. The business tax base is
limited

3. General city
improvements are lax

1. City pride

2. Attracting better
businesses

3. Fix the roads
Community, improved infrastructure, planned events, code enforcement, beautification. 92595 50-59 Two_or_More_of_the_above_Rac es/
12 1.not too much traffic

2. Love the family feel of
the schools

3. Love that lots of families
know each other

1. School reputation - need
duel immersion through k8. Diff languages.
-clean neighborhoods
-Infrastructure

1. The neighborhoods need
to be cleaned up/ more
code enforcement

2. Traffic enforcement at
stop signs

3. Wildomar is still small and so in a great place to grow as a progressive, fun, beautiful city. To get there, we need more educated home owners, a better reputation for our schools and a cleaner city. If we can do that and keep the small town feel, I think we can be a one in a million city. Start by offering programs in the schools that are not offered in the neighboring cities- duel immersion of several language choices k-8, could be one. And let’s get the schools looking beautiful. So many of them seem rundown and sad.

We could also make more trails for horses and walkers. Making the walkability of the city better would draw in more families. Making those trails accessible to horses keeps the rural feel of the city. Finally, we’ve got to clean up some of the eyesore properties. I think having stricter code enforce rules would go a long way in improving the reputation of the city. We can’t let this town seem like a place where druggies and low class folks like to live. 92595 40-49 White
13 1.the vibe

2.the views

3.how close it is to bigger
areas but not as crowded

1. 2.

3. 1.more sprout/activities for
kids

2. Better middle school

3. More parks/splash pad
A great place to raise a family with more activitis/sport leagues and parks like our surrounding areas. I wish we could break away from LEUSD and part of murrietta school district. 30-39 Two_or_More_of_the_above_Rac es/
14 1.People friendly town

2.Those that run things are
really just one of us.

3.Events put on by city.

1.Too much growth

2.New low income housing
in medium income housing
areas.

3.No street sweeping.

1.Open comunication.

2.More of the events for
the people of the city.

3.Police presence in
neighborhoods.

My vision would never happen. I grew up in Huntington Beach in the 1960s when it was still country living like Wildomar.

Today it is such a sad place. It is big time citified and that makes me almost come to tears when I visit the old homestead. Keep WIldomar a city in the country.
92595 70+ White
15 1. No multi story
commercial buildings to
obstruct view.

2. Generally quiet.

1. Crime, drugs and car
racing

2. 3.

1. Public parks with trees

2.community events

3. Clean, safe, community
Affordable housing
Community garden/farmers market- not in Elsinore.
92595 70+ White
16 1.small town feel

2.not crowded

3.friendly people

1.drugs

2.transients

3.not much to do

1.parks

2.shops

3.restaurants
I would like to see more activities being advertised for our youth. Concerts at the park, family activities. Wildomar has so much space but every time something is being built it’s either a gas station, smoke shop, liquor store, more homes or another fast food place.
92595 40-49 Hispanic_or_Latino
17 1.parks

2. Business

3. Farming

1.sidewalks

2.maintained streets

3.lack of trees and
vegetation

1.Trees

2. Side walks

3. More fresh food
Side walks and bike lanes down main streets. Trees and vegetation every where. Smaller and more affordable housing in empty lots. Please do not keep allowing massive, expensive dwellings to be built. More schools need to be built before housing. A Splash pad park. More family friendly businesses. 30-39 White
3537
APPENDIX A: Let's Envision Wildomar Survey Responses 3
What do you like about
Wildomar?
What challenges face the
City of Wildomar?
What would you like to
see more of? What’s your vision for Wildomar? Where do
you live?
What is
your age?
How would you identify your
race/ethnicity?
18 1. Quiet

2. Suburb

3. Family friendly

1. Too many marijuana
stores

2. Government/ affordable
housing

3. Approval of big chain
stores to be built

1. Family owned
businesses/shops

2. Own school district

3. Community events
Wildomar is a growing suburb that has potential to be a great city! We need to have a great schools, family owned businesses, and safe places for kids to play. A park with a pool and toys for families. Keep out businesses that are not family friendly. Marijuana stores attract crime. Keep out big chain stores. Keep Wildomar with that small city feel. 92595 40-49 Two_or_More_of_the_above_Rac
es/
19 1. Green

2. Part rual

3. Hardly any homeless

1. Too many new houses

2. Not enough professional
and blue collar jobs

3. 1. Professional and blue
collar jobs

2. Youth programs

3. I don't know at the moment 92595 60-69 Two_or_More_of_the_above_Rac es/
20 1. Quiet

2. Rural

3. Unpretentious

1. Population boom

2. Loss of small community
feel

3. Infrastructure (see nos. 1
& 2)

1. Not buildings or car
washes

2. Not houses or
apartments

3. Not fast-food or gas
stations
Keep it small-town. No more "progress." Fix existing roads and infrastructure. 92595 50-59 White 21 1.Rural/country feeling

2.Diversity (business,
shopping)

3.Space

1.Crime/homeless

2.Infrastructure needs
improvement

3.Some parts need clean-up

1.Small grocery, esp in
Northwest. Like Trader Joes.

2.Old Town/Farmers market

3.Community events
Keep that country, spacious feeling. Bring in local grocery, small business. Old town/down town,farmer markets. 92595 50-59 White 22 1.quiet

2.rural

3.home

1. Police response

2. Infrastructure

3.not enough jobs if not
retail or food

1.higher paying jobs

2.police presence

3.bike lanes
A safe still rural town with some industrial areas and jobs where you don’t have to commute. 92595 50-59 White 23 1.Wildomar is rural

2.Quite

3.small town community

1.poor road conditions

2.urban sprawl coming

3.poor community
development

1.bike & hiking trails &
parks

2. Improved community
development

3. Improved land scape
streets & roads.

I would like to see Wildomar as a community that is well planned out and welcoming to the people who live here. Bundy Canyon would no longer be a death trap to pedestrians and bike cycle riders. I would like Wildomar to remain rural with open spaces that are not a bunch of strip malls and littered with blight. 92595 60-69 American_Indian_and_Alaska_Nat
i,White
24 1.small town

2.not cookie cutter

3.areas of rural

1. People wanting it to be
like Temecula

2.old kranks

3. 1. Large lots when building
homes

2.apartments done nicely
and affordable.

3. A place with more city maintained spaces. 92595 60-69 White 25 1. Low taxes

2. Backyard Fruit trees,
gardens, and livestock

3. Friendly people and
businesses

1. Trying to be like other
cities

2. Road maint./mobility

3. “legal” marijuana cost to
city & crime

1. Small businesses along
palomar/mission trail

2. Lower fees to build 2nd
homes on property

3. Road repair
Family friendly, safe, improve current parks with water features and swings and structures for adults with disabilities.

Encourage agriculture and grow local, water storage, private funded art, 92595 26 1. Smaller town feel in the
right places

2. Having council members
available when needed

3. 1.Staff salaries, being
overstaffed

2. Bandaiding the roads

3.Pushing home based
businesses out of the city

1. fix the roads and leave
everything else alone

2. 3.

Honestly, don't try to make us something we are not. This is a bedroom community, and we don't need 1/2 the staff that is hired. Fix the roads, figure out a way to get the drug houses closed down, and get City Hall into someplace that we are paying through the roof with nothing to show in the end. 92595 60-69 White
3538
APPENDIX A: Let's Envision Wildomar Survey Responses 4
What do you like about
Wildomar?
What challenges face the
City of Wildomar?
What would you like to
see more of? What’s your vision for Wildomar? Where do
you live?
What is
your age?
How would you identify your
race/ethnicity?
27 1. Proximity to I15

2. Small, rural population

3. The right amount of
commercial development

1. Road maintenance

2. Beautification

3. Commercial
maintenance, ie: Palomar
Plaza

1. Public spaces

2. Nature parks/trails

3. Local historical
sites/monuments/parks
A planned, uniform building style (like The Barn on Clinton Keith and Palomar ), a main central community and/or government space, a local paper or circular 92595 50-59 White 28 1.love the country feel

2. Love our mountains

3. Love our diversity

1. Traffic

2. Rapid growth

3. Street degradation

1. Winco store

2. Horse trails

3.bike trails
A quiet, diverse community. Keep commercial businesses near the freeway. Homes away from the freeway. 92695 60-69 White 29 1. Quiet neighborhood

2. Not as much traffic as
Temecula and Murrieta

3. Little more rural not as
developed

1. Run down/littered
homes and property- needs
enforced- fire hazards

2. Homeless people

3. Drug houses

1. Less condos/track homes

2. More trees and greenery

3. Better restaurants (no
more chains, no car wash)
A safe and clean community to raise families. Better school ratings. Support more small business. Stop developing condos and track homeS. Start enforcing cleanup for properties littered with trash and broken down crap everywherethey’re fire hazards and no one wants to live next to them. More trees or parks and keep open space. Stop building on every available inch of open land, instead clean them up and plant trees and build parks. Need more greenery. 92595 30-39 White
30 1.close to everything.

2.friendly

3.family values

1.traffic

2.affordability

3.crime
1our own stores.

2.couple more gas stations

3.a college
Keep it rural, simple and affordable. 92595 60-69 White 31 1.Rural atmosphere with
open space

2. Balanced housing to
business

3.Good people and good
neighbors

1.slowing growth

2.we owe Wildomar
citizens housing not the
nation (no build, build
build)

3.balance/caution

1.parks

2.trails

3.24 he fitness
Live here until the good Lord decides otherwise 92595 60-69 Two_or_More_of_the_above_Rac es/
32 1. Rural

2. Friendly

3. Accessible

1. Homelessness

2. Poor choices for new
business

3. Crime

1. Parks!

2. Green space

3. In n Out or Chic fil a
Wildomar should be a community with plenty of parks and safe neighborhoods with a rural feel. It’s accessibility to the 15 freeway and low taxes should help it continue to grow as a great place for families. 92595 50-59 White 33 1.Small Community

2.Very Convenient

3. 1.Needs better parks .

2.parks should have
restrooms and water.

3.no water or restrooms at
some parks

1.Shopping

2.Parks

3.Bike trails for kids.

More shopping to avoid Temecula. Better parks and open space for trails. 92595 70+ White 34 1.location

2.community

3.potential

1.living cost

2.potholes

3.traffic on the 15

1.night life

2.activities

3.putting stuff on all the
dirt lots around
A city that isn’t half dirt lots and apartment buildings, I think it would be beneficial for the city and its community to have activities in the city, bringing in new businesses and restaurants and bars, a downtown area. So that I don’t have to leave the valley to have fun.
92595 20-29 Two_or_More_of_the_above_Rac
es/
35 1. Small city vibes

2. The local restaurants and
coffee places

3. Quickness of the
response of counsilmember

1. Not enough sports focus

2. Expanding but not
thinking of traffic

3. Not fixing the roads

1. Youth sports

2. City rec center

3. City events
I hope Wildomar will become a great place people will want to come to. There is a lot of “new Wildomar” vs “old Wildomar” and its clashes against each other. I hope that the city will unify and come together to be the new “it” place to hang out and be.
92595 20-29 Two_or_More_of_the_above_Rac
es/
36 1.Rural atmosphere

2.Location

3.Available resources
(stores, hospitals, etc.)

1.Traffic

2.Dirt roads

3. 1.

2. 3.

A rural feel, horse town type atmosphere. Not over developed like our fine neighbors in Murrieta. A Norco, Ca feel. large expensive estate properties'. 92595 60-69 White
37 1. It's like Temecula 30
years ago.

2. 3.

1. Roads

2. Old Trailers and
manufactured homes.

3. 1. Upscale very nice tract
housing developments that
have Associations

2. 3.

The finest city in Southern California. 92595 60-69 Two_or_More_of_the_above_Rac es/
3539
APPENDIX A: Let's Envision Wildomar Survey Responses 5
What do you like about
Wildomar?
What challenges face the
City of Wildomar?
What would you like to
see more of? What’s your vision for Wildomar? Where do
you live?
What is
your age?
How would you identify your
race/ethnicity?
38 1.Rural Feel

2.The Dairy!

3.Easy access to freeways

1.Too much development

2.Infrastructure

3.Water

1. Water conservation

2.Public Works department
expanded (roads, etc)

3.open space preservation
A small town that retains the small town feel with locally owned and operated business. Not the next Temecula... We need thoughtful and spread out planning and not focus on putting everything in one corridor. Spread it out between several of the main roads / exits we have off the freeway but also plan for it with infrastructure (roads, utilities, drainage, etc).
92595 40-49 White
39 1.quaint

2.quiet

3.neighborly

1.need swimming place

2.need more Sheriff s

3.more fixing streets

1.more shops

2.more police

3.community parks
Need to be able to swim in our city! Been here in Wildomar for 45 years, beautiful city! 92595 60-69 White 40 1.safety and security

2. Close proximity to
hospitals

3. Small city atmosphere

1. Growth

2. Industry

3. Maintain a low tax base
for homeowners

1.jobs jobs jobs

2. 3.

Slow growth 92595 70+ White
41 1.general rural area

2.convenient shopping

3. 1.traffic

2.bus service

3.excessive development

1.less building

2.more police presence

3.street maintenance
Better roads 92595 70+ White
42 1. Rural small-town feel

2. Affordable Housing

3. Close to nearby amenities

1.Crappy Street
Maintenance

2.Sellers Road
closed/excessive time

3.JMI selected contractor
for Bundy imp

1.parks

2.road cleaning/repairs

3.Sellers Road to Open
To keep the small-town feeling 92595 50-59 White
43 1.Not over populated

2. Family community

3. Have mountains

1. Streets many potholes

2.Not too many shopping:

3. Not too many
restaurants with great
foods

1. Smoother road

2. Safety/ security for
speeding/ tailgating

3. Better landscaping entry
way from freeway
More stores for revenues to improve community 50-59
44 1.affordable

2.small town feel

3. 1. lack of businesses
growth

2. Poor school district

3. Potholes

1. Shopping center

2. Parks/walking trails

3. A downtown or Main
Street area
A small town feel with parks, shopping, a Main Street, and walking trails 92595 30-39 Hispanic_or_Latino,White 45 1.close to temecula

2. 1 he from the beach

3. “Affordable” when we
moved here

1.no city municipalities
(road repair/street
sweeping)

2. Hoarders

3. Empty shopping centers

1.small businesses

2. Variety of stores

3. Enforced Parking
regulations
Beautification. So many people say they love the “ruralness” of Wildomar but to the outside eye it’s a dump. Hoarders on big plots, cars parked for weeks to months collecting dirt, deteriorating roads. Wildomar looks like it takes no pride in itself.

We have huge shopping centers left vacant while we keep cramming businesses off of Central in Elsinore.

Wildomar can keep is small community feel without looking like it’s taking in the unwanted of Orange County. I am proud to own my home, but I feel so many of my neighbors and the city don’t care to be proud of themselves. 92595 30-39 White
46 1. Quiet neighborhoods

2. Ability to do what you
want to your home.

3. Citizens being involved

1. Homeless people coming
in.

2. Weeds growing
everywhere

3. Not fixing things on time.

1. More activities for kids.

2. Park celebrations

3. Parks near bundy/seller.

I would love the city to offer more jobs, community activities, shops, parks for kids/dogs. 92595 30-39 Black_or_African_American,White 47 1. Quiet is appealing.

2. People are considerate.

3. Love business access.

1.Homelessness.

2. Street repairs needed.

3. Sewage access needed.

1. Community gatherings.

2. Elderly checkups.

3.Activities for teens.

Let's stay small town but with modern amenities. Access to the cities are a must, however, traffic is a real problem. We need to expand law enforcement. Fresh/clean water should be a right for all. A large community center would be a big improvement for the community.
92595 60-69 White
3540
APPENDIX A: Let's Envision Wildomar Survey Responses 6
What do you like about
Wildomar?
What challenges face the
City of Wildomar?
What would you like to
see more of? What’s your vision for Wildomar? Where do
you live?
What is
your age?
How would you identify your
race/ethnicity?
48 1.community

2.rural small town feel

3. A Good class if people
still live here

1.keeping the small town
feel & rural look

2. homeless/drug addicts
3 law enforcement
presence

1.less homelessness drug
addicts

2.more law enforcement
around

3.more trees/ nature
around the city
A rural small town feel still. House with bigger property. Not just a bunch of track homes close together with no back yards. Don’t make the city housing so cheap that the city starts attracting people with no sense of class. Trees and nature through out the city so it does not look nor feel like I’m living in a cement block. A tight community with activities for all ages and special needs.
92595 40-49 Hispanic_or_Latino
49 1.semi-rural areas with
animals plus
hospitals/shopping

2. Welcoming to ALL

3.peaceful west side

1. Affordable housing, incl.
mid & low income

2. Maintaining rural feel

3. Traffic that comes with
growth

1. More walking paths (like
on Grand)

2. Green spaces/parks

3. Restaurants that aren’t
all fast food
Sufficient services and safe walking paths that allow people, pets, and horses to get around town without always having to drive would be nice. A sense of being at home, peaceful with lots of open space and green areas yet important services are nearby.
92595 70+ White
50 1. Great neighbors.

2. Country feel

3. Love the weather

1. Growth

2. abstract planning

3. Traffic increase

1. Police

2. Code Enforcement

3. Street repairs
Slow controlled growth, more community programs for our youth & elderly with a focus on diversity. A need for more city parks, and engage in more special events to draw attention and increase revenue for our local business creating a warm memorable hometown environment.
92595 70+ White
51 1.Family

2.Small Town

3.Location

1. Infrastructure

2. Lack of Good Schools

3. Lack of Tourism
Attractions

1. Tourism

2. Entertainment

3. Zoning that
supports/attracts
businesses.

School districts need to be at the same levels as Temecula and Murrieta. A large area designated for business/industrial parks will attract more business coming into Wildomar (similar to the large business stretch on Jefferson Ave in Murrieta).

Infrastructure that supports tourism and attractions.

A Cal State University.
92595 30-39 Hispanic_or_Latino
52 1. Smaller Community

2.Close to everything

3. 1. Ongoing growth

2.Traffic

3. 1. Better parks for kids

2.Water and restrooms in
all parks

3. Ongoing community imput and consistant growth for community. 92595 70+ White 53 1.rural atmosphere

2.small town living

3. 1.remain small but prosper

2. 3.

1. 2.

3. My vision would not include the fuel station that is proposed at the I-15 Wildomar Trail location. Having big rig’s congregating in that area will lead to both air and noise pollution that will greatly affect those Windsong Valley residents whose property backs up to that area. We do not need a truck stop in our backyard. This is not what we anticipated when we bought in this wonderful rural town.
92595 70+ Two_or_More_of_the_above_Rac
es/
54 1. It has a developing but
still grounded cowboy
culture.

2. 3.

1. Crime and negative
outside changes.

2. 3.

1. Embrace our cowboy
and rancher roots

2. Encouragement of gun
ownership including
concealed carry

3. A peaceful and safe community of aspiring ideas and businesses but set in the backdrop culture and environment of our cowboy and rancher past. This can easily be accomplished by encouraging more gun ownership, social events with police, organic farm to table farmers markets, opening of gun ranges to teach proper gun safety, and the adoption of laissez faire politics to keep our community free of government overreach. 92595 30-39 other
55 1. Not a lot of city rules

2. It hasn't turned into Lake
Elsinore

3. Not pretentious like
Murrieta

1. Crime

2. Too much politics and
government involvement in
our lives.

3. Saving our cultural past.

1. Farmers markets

2. Gun shops and shooting
ranges

3. Encouragement of local
farming including bee hives.

A community that doesn't embrace the woke ideology that turns everything to crap. Please don't allow marijuana shops in our town. It attracts the bad element. We should have more citizens carrying guns to keep us safe. Police are too late in responding and as the last two school shootings proved, the police don't engage shooters. Only residence can keep the criminal element out of our town. We should have more local farming. DeJongs Dairy Farm is a perfect example of what our town needs more of. What a local blessing DeJongs provided during the pandemic when you couldn't get eggs or milk at the grocery stores but it was produced locally in our great little town and provided much needed milk and eggs. We need more dairies, farms, local meat production like cow ranches and bee hives. 40-49 Two_or_More_of_the_above_Rac
es/
56 1.rural

2.community

3.wildlife

1.too many car washes

2.grocery needed off
Palomar

3.housing planning a
disaster

1.building continuity

2.more park land

3.public road landscaping
as in Murrieta
Need lots of improvement to beautify Wildomar Landscaping, building design, parks, road improvements 92595 70+ White 57 1.proximity to other cities

2. 3.

1.infrastructure

2.retail development
(bundy canyon area)

3. 1.businesses

2.parks

3.community
A place to grow a family without having to travel to neighboring cities for necessities. 92595 30-39 Hispanic_or_Latino 3541
APPENDIX A: Let's Envision Wildomar Survey Responses 7
What do you like about
Wildomar?
What challenges face the
City of Wildomar?
What would you like to
see more of? What’s your vision for Wildomar? Where do
you live?
What is
your age?
How would you identify your
race/ethnicity?
58 1.Small community

2.Somewhat rural feel

3.Low rate of serious crimes

1.Growing traffic + poorly
timed lights

2.Deteriorating
infrastructure (roads,
power, etc)

3.Handling growth

1.Parks

2.Small businesses

3.Updated/repaired
infrastructure
When my family moved here in 2020, Wildomar was a small, friendly community. I understand that growth is necessary for any city, and that state/county require certain amounts of high-density housing, but I feel like Wildomar should hold to the minimums in that regard.

Also, being small business-friendly would attract a broader tax base and bring in diverse retail and services. We could possibly create a unique shopping opportunity for locals and visitors to compete with Temecula Old Town. 92595 60-69 White
59 1.rural

2.quiet

3.soothing infrastructure

1.urbanization

2.too many people

3.not enough

1.country

2.community

3.respect for others
We want Wildomar to remain a large,y rural community 70+ White 60 1. Rural/country feel

2. Family oriented

3. Community

1. Traffic/Dangerous roads:

Bundy Canyon

2. Traffic lights

3. Some communities lack
public transportation

1. Traffic lights on Bundy
Canyon Road.

2. Public transportation

3. Own police force.

Wildomar should continue to have the country feel. It is one of the biggest reasons a lot of families including my own moved here. I would like to see more public transportation too. This would help my daughter who is going to MSJC who doesn't own a car yet, tremendously. We need more community events for all. Maybe a community center where recreational classes can be held. Maybe expand our community library too. It can be the extension of a community center for all ages.

My family and I like going to the Marna O'Brien park. I don't know if there could be another closer to the east of Wildomar?
I would like to see major improvement on Bundy Canyon. My family and I have been living in the Farm Community for the past 17 years. We have heard and seen so many accidents happen on this road. It is especially dangerous at night! It is really dark. Dogs get lose and ran over. Drivers do not slow down...not even at night. 92595 50-59 Hispanic_or_Latino
61 1. Farm life

2. The views /although we
are losing them

3. When it was quiet with
no construction or traffic.

1. Kaiser building going in

2. new gas stations

3. homeless and drugs
coming in. Schools with
agendas

1. Police

2. Farm life

3. Farmers markets
No more gas stations. More houses with more property so people can have live stock and gardens. Stop placing houses so close together. 92595 40-49 White
62 1.community

2.neighborhood unity

3.expansive area

1.overcrowding

2.business zoning

3.roadwork improvement

1.community events

2.neighborhood watch

3.traffic control maintain,
rural feel while monitoring
and growth
Moderate business growth for the well being of the city while offering improvement to the landscape and infrastructure 92595 50-59 Hispanic_or_Latino 63 1.open spaces

2.quiet neighborhood

3.lack of surface street
traffic

1.over development

2.lack of infrastructure

3.increased property crimes
1neighborhood police
presence

2. organized parks and rec
programs
3neighborhood
beautification incentives
More organized recreation opportunities, improved infrastructure, improvement/cleanup of blighted areas, increased night patrols by police 92595 60-69 White
64 1.Not overpopulated

2.View of sunset over the
Ortega

3.Tons to do!

1.low income housing

2.meth

3.crappy roads

1.trees and landscape

2.restaurants & movie
theatre

3.community fun!
Stop building! Too many cookie cutter ugly apartments. Unless it’s a community pool(s) park, bbq’s, water park for kids with sun shades and misters! It’s sooo hot here- and clean up the Lake! Nothing should be that colour! 92531 50-59 White 65 1.The country feel to the
city.

2.Friendly people.

3.Shopping and doctors are
close.

1.Growing homeless
population

2. Water shortage

3. drugs off the streets

1.Upkeep on roads

2.parks and walking trails

3.paved streets and
sidewalks
Hopefully Wildomar keeps a small town feel while improving roads. A few parks would be nice. Open areas for wildlife. I grew up in California and just moved to Wildomar for the openness and country feel. 92595 60-69 Two_or_More_of_the_above_Rac es/
3542
APPENDIX A: Let's Envision Wildomar Survey Responses 8
What do you like about
Wildomar?
What challenges face the
City of Wildomar?
What would you like to
see more of? What’s your vision for Wildomar? Where do
you live?
What is
your age?
How would you identify your
race/ethnicity?
66 1.rural

2.space

3.small

1.building

2. Small lots

3.traffic

1. Open space

2. Homes on 1/2 to 2 acre
lots

3. More rural
So many times you lose the value of your property because the city becomes a nightmare like Temecula. The reason Wildomar is special is because it's more rural and it will just be like any other town that blends into lake Elsinore and Temecula and it will lose its value if we lose our space and our rural element... Homes should be on Big lots and more of a farm feel which translates to privacy and hence more value. 92595 60-69 White
67 1.Preservation of our
historic past

2.It still feels like a small
town

3. 1. Lack of gun rights

2. Too many building
restrictions

3. Crime

1. More freedom

2. More local fresh produce
and meat sources

3. More community
education on how to thrive
Lets face it. We are on the precipice of a recession and most likely a historic depression with continual food inflation. We as a community need to become self sustaining to weather any future calamities like more inflation, pandemics, economic turmoil. The citizens of our community need to be encouraged to start family back yard farming. We need more local gardening/farming.
40-49 White
68 1.everything

2. 3.

1.Paving dirt roads

2.stop blocking roads to get
to your home ( Westly and
Palomar Rd)

3. 1.Dirt Roads Paved

2. 3.

More sport parks for the Kids 92595 70+ White
69 1.small town feel

2.horses

3.less crowded than
murrieta and temecula

1.reducing lot sizes for
higher density

2. traffic

3.horses to safely move
around the traffic

1.keep it rural

2.maintaining horse trails

3.put up signals versus stop
signs when traffic becomes
dangerous
Go back to what we all bought into this city for. Keep it small town rural. Give us a street like old town murrieta so we can spend our money in our own city. 92595 40-49 White
70 1.Rural atmosphere.

2.Stores for shopping and
restaurants. But not to
close.

3.Police respond fast.

1.Slum looking housing.

2.Roads

3.Parking for cars.

1.Speed bumps.

2.More stop signs.

3.More police .

Start HOAs in places that have slum looking houses on the blocks of the homes that were built in the early 90s. To many families living in a single family home. To many cars blocking the side walks. 92595 70+ White 71 1.size

2.cleaniness

3.affortability

1. smoothRoads!!!

2.sidewalk connectivity

3.speeders!!

1. code enforcement on
empty fields and their
fences

2.traffic enforcement!!!

3. again, enforce
deweeding.

I would like to see Wildomar stay about the same size. I would love to see more traffic enforcement but just not with speeders or rolling stops but with littering and graffiti. Pretty much anything that is offensive on a daily drive. Keep what we have but make it much better. Connect the sidewalks so people can walk uninhibited. Bike lanes!!! A couple more parks but not everywhere. Install cameras (like London) then change the laws so it's easier to prosecute. 😂😂 92595 60-69 White
72 1. It seems safe

2. It seems clean

3. 1. Not enough for older
kids to do

2. Places for families

3. Not enough community
parks, pools, amenities

1. Parks that are enjoyable
for families

2. Community spaces

3. Community/family events
Growth that includes well thought out communities with amenities, particularly for families, kids, and young adults.

Leaving the city to work is almost a given, but to leave for any recreation is not a healthy city. It breeds unhealthy and unsafe activities when kids have nowhere to go. Cultural, creative, and fun spaces and events for families will attract quality residents as well as we grow. Thinking libraries with Makers Spaces; technology & robotics clubs/training, arts, crafts, pools, live theatre, culture, an attractive walkable "downtown", museums... 92595 40-49 White
73 1.small town

2.conservative community

3.quiet

1.too much building/
lacking infrastructure

2.communityfacilities ie
aquatic center & parks

3. Apartments

1. Aquatic center

2.parks

3. Sidewalks
To keep the small town feel, conservative values, family oriented community sites i.e. aquatic center and parks and perhaps Wildomar can get its own high school. Less apartments less building in general. Hire more city employees perhaps work on Friday so that people who actually work have options. 92595 40-49 Hispanic_or_Latino
74 1. Family orientated

2. Has a small town feel

3. 1. Growth-we need more
businesses/attractions

2. Crime (we need our own
police station)

3. Businesses

1. Attractions
Winery/Brewery w/water
slide or prk

2.Cmmty- Sprts Prk/Prk
w/a pool

3.Voter Integrity
Start utilizing our hills! Get a Winery/Brewery going to start making Wildomar more self sufficient. No more houses, there are many different business that we can get contractors for, we have way too many houses and not enough attractions/businesses. Stop focusing on things that can bring revenue to Wildomar. Get out from underneath other Cities (like Murrieta) and reclaim what has been taken from us. Focus on community, a community center in a sports park that also has a public pool. We could charge NON residents to swim in our pool plus have a "Summer" Snack Bar/Grill. I know we have Marna O'Brien but from what I've been told there's not much more we can do with that Park.

Lets get small Businesses back up and running and become more local/small Business sufficient. Some business ideas for Wildomar: Winery/Brewery w/a waterpark and water slide, Waterpark, Drive In Movie Theater, Skating Rink, (Ice in Winter/Roller in Summer) TRADER JOES, Trampoline Park, Equestrian Center. 92595 60-69 other
3543
APPENDIX A: Let's Envision Wildomar Survey Responses 9
What do you like about
Wildomar?
What challenges face the
City of Wildomar?
What would you like to
see more of? What’s your vision for Wildomar? Where do
you live?
What is
your age?
How would you identify your
race/ethnicity?
75 1. More rural than
surrounding areas
(Murrieta, etc)

2. Small town vibe

3. Less development

1. Traffic

2. Retaining small town feel

3. Overdevelopment

1. Community activities

2. Services such as street
sweeping done REGULARLY

3. More parks/open spaces
To see the city grow with a well thought out plan; development seems haphazard and not well considered. More open spaces/greenbelt areas/parks rather than filling up every empty space with densely packed housing developments and large commercial enterprises. To keep small town feel and not choke out rural atmosphere by overdeveloping. 76 1.Semi Rural

2.Proximity to Nature

3.Low Population

1.Rising Crime

2.Poor Road Maintenance

3.Water & Trash Costs

1. Restaurants

2. Ice Skating Rink

3. Public Pool

1.Non-corporate businesses

2.Routine Litter Pickup & Enforced Littering fines-currently $1000. in some very clean cities

3.Small starter/retirement homes; tiny home village; dublexes & triplexes instead of mini mansions

4.High revenue business with ample parking & traffic flow 92595 50-59 White
77 1.nature

2.activities

3.hikes

1. 2. Lack os stores

3. 1.groceries

2. 3.stores
More stores 92595 30-39 White
78 1. Rural feeling

2. Beautiful valley scenery

3. Access to all shopping
needs

1. Over building

2. Over population

3. Traffic

1. Police presence

2. Street maintenance

3. Community activities
Keeping the rural feeling. Controlling the over building and keeping down the population. 92595 60-69 White 79 1. Small Town feel.

2. Proximity of amenities.

3. Easy to get on and off
freeway.

1.Water, push for
desalinization plant.

2. Over populating
community.

3. Road and driving hazards
increase.

1. Mega indoor
recreational community
center 500 to 1000
captivity.

2. Restrict building

3. Sports programs
I envision Wildomar to be the leader in technology and aerospace engineering. We can create jobs where we live by reaching out to companies and provide the work space right here at home.

Secondly let us take a hard look and at Natural resources. Food, water, and power are in high demand. Preparing for the future, requires a detailed plan for success. Support local farming, and encourage home grown food. Encourage drought tolerate plants in our neighborhoods. Create more community events so families can enjoy our town.

Furthermore, we need to mitigate risk to the community, implement risk management procedures through a risk assessment. Log hazards and implement controls. Roads need to be assessed for drivability, proper drainage, and correct asphalt or concrete mix applications. Signage and street name changes should be requested through the county of Riverside.

Lastly, our children are our most important resource, we need to keep these future leaders educated and engaged. 92595 40-49 White
80 1.away from the city

2.decent shopping

3.great neighbors

1.crime

2.homeless

3.road construction

1.police

2.restaurants

3.traffic lights
Since we’re in a drought how about stop building more housing. 92595 60-69 White 81 1.country like

2.less populated

3.houses with acreage for
horses

1.crime

2.unemployment

3.illegal drugs

1.police

2.community patrols

3.decreased crime
If continues at current path,a lot of us will MOVE!! 92595 60-69 White 82 1. rural feel but close to
grocery stores, hwy

2. Not as busy as Temecula

3. Not too many homeless

1.shopping options (target)
. prefer to pay taxes
towards wildomar

2. Community evens

3. School ratings

1.local shopping

2.upkept streets

3.city events with more
participation
I see Wildomar as a place for families to live and enjoy it, not so much a tourist destination like Temecula. It would be nice to provide activities for local families including parks, activities, with city hosted events. More mom and pop restaurants would be great.
30-39 Asian
83 1.not over built like
Temecula and Murrieta

2.still somewhat rural

3.open spaces green areas

1.sales tax revenue

2.traffic

3.law enforcement staffing

1.more cops

2.more restaurants

3.more single family homes
and less apartments
Keep the rural feeling of the city by not building on every piece of open space. More cops on the street to do targeted Enform like transients, package theft etc. 92595 50-59 White 84 1.Country Feel

2.Open Spaces

3.Convenient Shopping

1.Traffic

2.Low Income Housing

3. 1.Hiking Trails

2. 3.

I don't have a vision right now 92595 70+ White
3544
APPENDIX A: Let's Envision Wildomar Survey Responses 10 What do you like about
Wildomar?
What challenges face the
City of Wildomar?
What would you like to
see more of? What’s your vision for Wildomar? Where do
you live?
What is
your age?
How would you identify your
race/ethnicity?
85 1. Our People!

2. Small town feel

3. Room to breathe

1. Tax money to necessities

2. Large low income
housing invading

3. Road paving needed

1. Street sweeping

2. Police

3. Farmers market
Stay with the small town feel while slowly growing with companies/businesses/stores that will generate more revenue for the city. 92595 60-69 White
86 1.the weather

2.close to hospitals

3.friendly residents and
neighbors

1.development

2.drought

3.potential fires/floods

1. PEDESTRIAN ACCESS TO
SHOPS

2.sidewalks

3.police
A great place to raise a family or retire. Not only great, but safe. 92595 60-69 White 87 1. Small town feel

2.growing

3.easy access

1.growth

2.tolerance

3.diversity

1.community events

2.education about diversity

3.home growth
To create a community that is diverse and respectful of all its citizens regardless or race, gender or sexual orientation. 91595 40-49 Hispanic_or_Latino 88 1.Less housing

2. 3.

1.Bundy Canyon Road

2. 3.

1.Restriction on housing

2. 3.

More open space 92595 70+ White
89 1.quiet at night

2.scenic views of
mountains

3.horse trail on Grand Av.

1.Tre Logos Development

2.development along
Clinton Keith

3.Drivers doing rolling
stops at stop signs

1. More OPEN SPACES

2.limit on fast food facilities

3.a Whole Foods store
I would like have Wildomar remain a small community with a smaller scaled development for subsidized housing. Also, this community should not allow the establishment of warehouses. Most of all we need a community center with a large park surrounding it.
92595 70+ Black_or_African_American
90 1. Small

2. Town

3. Living

1. The City is selling us out

2. The project proposal by
Staters

3. Crime in the rise

1. More police patrol

2. Parking for the
businesses

3. Stop low income/ halfway house project. If you must sell us out, please consider the infrastructure that is needed to support it.
92595 40-49 White
91 1.community

2.quaint rural vibe

3.general friendliness

1. Excessive growth

2. Poor (or delayed)
structural/engineering

3. Traffic

1. Pedestrian paths

2. Community support
decreased vehicle traffic

3. Local companies (job
opportunities)
Keep the quaint esthetics of the area with growth with businesses, while increasing pedestrian and bicycle traffic and decreased vehicle traffic. 92595 50-59 Two_or_More_of_the_above_Rac es/
92 1. Affordable

2. Rural

3. Close knit

1. Crime (thanks to the
governor)

2. Homeless (thanks to the
governor)

3. Lack of entertainment

1. More reduction in crime

2. Cleaner streets

3. Local entertainment
A nice rural town with clean streets, little crime, and a place to take the kids for a fun night out. 92595 40-49 White 93 1. Country vibe

2. Quiet nights

3. Less traffic

4. Friendly people

5. Open spaces

1. Stop the urbanization

2. Stop building the "burbs"
EVERYWHERE!

3. Providing water, electric,
internet

1. Open spaces

2. Less housing tracts being
built

3. More Farmer Markets
along the open
roads/highways
For Wildomar to retain the open country feeling it has, that's why I moved here. Stop trying to compete with the BIG city's.... People that want the BIG city aren't going to be moving to Wildomar as long as it retains it homey, country feeling.... I love the peacefulness Wildomar offers! That's the best part of Wildomar. Small town living not far from the BIG city if you want to venture out into it.
92595 60-69 White
94 1. small town feel

2. open space

3. quiet

1. over development

2. traffic

3. homelessness and crime

1. slow down development

2. street repairs

3. more responsive police
department
Keeping the small town "country" feel. Increased police force, including traffic enforcement. 92595 50-59 White 95 1.country feel, foothills

2.the trees, vegetation,

3. Just close enough to
stores

1. Growth, too many
housing developments

2. traffic & noise of it

3. Lack of safety

1. Street maintenance

2. Bike trails, lanes

3. Country store with local
produce, etc
All of the above.

Keep it as is, but clean it up. Prune trees, not remove. Keep the country feel. 3545
APPENDIX A: Let's Envision Wildomar Survey Responses 11 What do you like about
Wildomar?
What challenges face the
City of Wildomar?
What would you like to
see more of? What’s your vision for Wildomar? Where do
you live?
What is
your age?
How would you identify your
race/ethnicity?
96 1. Rural

2. Friendly

3. Small Town feel

1. Bundy Canyon traffic and
road is horrible.

2. Most roads need repair.

3. Need street sweepers

1. Sidewalks Street lamps

2. Planting of drought
resistant plants and clean
up of freeway.

More law inforement visibility. 92595 70+
97 1.Small community

2. Has family-owned
businesses

3. Generally a quiet place
to live

1.Expensive Electricity

2. Known as a fire hazard
area by home insurance
agents

3. Lack of diverse jobs

1. Department store

2. Local entertainment

3. Expanded resources for
the community
It would be nice to see a shaded park for family picnics on the east side of the I-15. More community events would be nice, such as farmers markets, educational events, job fairs or entertainment events. 92595 30-39 Hispanic_or_Latino 98 1.Rural yet suburban

2. Safe neighborhoods

3. Great place to raise kids

1. Growth of businesses
without infrastructure
support

2. Homeless

3. Increase in crime - need
more patrols

1. Police patrols

2. Information dispersed

3. City activities
Growth with enough infrastructure built to support the growth. Parks and open spaces. Do not want the proposed build in Windsong Valley which will increase crime and lower our property values 92595 50-59 White 99 1. Ample shopping and
stores

2. Close to OC, SD, and
Riverside

3. 1. Crime from Lake
Elsinore.

2. Recession/Depression
that will impact local
economy

3. 1. Joint police and citizen
anti crime events

2. Farmers markets

3. Workshops for self
sustained living
A mecca of community self sustainability.
100

1.Nice retail corridor along
Clinton Keith

2.Some walking trails

3. 1.Crime

2.Run down properties

3.Lack of mobility

1.Diverse retail/business

2.City wide mobility

3.Better city planning
utilizing new general plan
Balanced growth of housing /businesses 92595 50-59 White 101

1.small

2.private

3.proximity to larger cities

1.overcrowding

2.traffic

3.crime

1. Clear zones for industries
and housing

2. More parks, and trees

3. Less construction
Its nice that Wildomar isn’t completely built out, we don't need a building on every lot, we need open spaces, trees and walking trails. The traffic is getting bad because these communities were not built for so many people. Grow wisely not quickly.
92595 30-39 Two_or_More_of_the_above_Rac
es/
102

1.freeway close

2.lower cost of housing

3.centrally located

1.drugs

2.lack of jobs

3.homelessness

1.police

2.opportunities for
homeless/jobless

3.more code enforcement
clean it up! Terrible drug and crime problems in Wildomar. Also, need better code enforcement in some of the 'older' neiborhoods 40-49 Two_or_More_of_the_above_Rac
es/
103

1. Wildomar still feels like a
small town which is great

2. City planning seems to
be strategic

3. 1. Too many regulations
and rules

2. Illegal immigration

3. Real Estate prices

1. Less homes, more
farming

2. Horse trails

3. embracing of our core values as a community such as farming, raising horses and protecting our 2nd amendment. 40-49 104
community involvement

2.open space

3.country look and feel.

1.Hiking Trails

2.Safe bike routes

3.Over growth impacting
our roadways.

Community Center for kids
and adults

2. Community Swimming
pool.

3.Community garden
Safe activities for teenagers and Interaction with teens and adults.

Older adults sharing their skills with our youth in our community 92595 70+ White 105

1. Indoor Shooting Range

2. When break ground

3. Love my Neighborhood

1. 2.

3. 1.

2. 3.

To have it's own Indoor Shooting Range 92595 70+ White
3546
APPENDIX A: Let's Envision Wildomar Survey Responses 12 What do you like about
Wildomar?
What challenges face the
City of Wildomar?
What would you like to
see more of? What’s your vision for Wildomar? Where do
you live?
What is
your age?
How would you identify your
race/ethnicity?
106

1.Rural feel

2. Close to cities

3. Low crime

1.Traffic increase (Clinton
Keith Rd.

2. Existing roads
maintenance

3. Oodles of dirt roads in
parts of town

1. Public plunge

2. Traffic enforcement

3. Indoor recreation
Entertainment and recreation center surrounded by open foothill views 92595 70+ Two_or_More_of_the_above_Rac es/
107

1.small town atmosphere

2.mixed housing
opportunities

3. 1.road repair

2.tax income opportunities

3.crime and homelessness

1.more police presence

2.more parks

3.more working
opportunities
Maintain historically significant items (buildings, bell, etc.) while growing the city with retail and commercial areas. Keep our ranches and large lots and our open areas as much as possible. We also need the college to be built and a large park with ball diamonds, football fields and basketball courts. How about a community swimming pool. Just a fe2 ideas! 92595 70+ White
108

1. Small rural town feel

2. Not too busy

3. Less traffic

1. Homeless encampments

2. Road damage/disrepair

3. 1. More open space

2. Parks

3. Better roads and walking
paths
Small rural town 92595 50-59
109

1. small town feel

2. adequate grocery
shopping available

3. an attempt to keep
residents involved

1. businesses detrimental
to Wildomar's reputation
are being allowed

2. traffic at major
intersections

3. 1. rope-lined paths (like
along Grand)

2. police presence

3. higher end restaurants
Upgrading allowed businesses/ no more cannabis, dollar stores, similar. Businesses that provide higher paying jobs. A community center for large meetings, facilities and resources for seniors, make undeveloped lots on Clinton Keith open spaces/parks, instead of fast food businesses that only bring more traffic. A plan for aesthetic improvement around the Inland Valley medical center/Clinton Keith intersection. Fix the **** roads. Area around the post office needs to be improved visually. Better communication with the residents; I know you send out the mayor's message and invite people to meetings, but we hear nothing about what is being discussed or decided. A well organized volunteer organization. Organized sports for seniors; i.e., morning/evening walk, senior stretch classes, etc., at Marna O'Brien park. The city is just not very pedestrian friendly.
92562 60-69 White
110

1. Mom & Pop businesses

2. Rural spaces for horse
ownership/livestock

3. Helpful library personnel

1. Growing too fast, school
district lines will need to be
redrawn

2. Increasing traffic

3. Taxes

1. Services: veterinarian,
VA, home improvement,
etc.

2. SCHOOLS

3. Improved streets
NO MORE BUILDING. Wildomar is not Temecula. It's not Murrieta. We don't have nor want the infrastructure in place for that kind of growth. Most of us were attracted to this area because it was open and undeveloped and still within a few minutes of necessities. The traffic and constant growth isn't sustainable and it's tainted the charm of the area. 30-39
111

1.open land

2.like minded individuals

3.farming

1.increased laws and
regulations

2.illegal immigration

3.water supply

1.more farmers

2.horse trails

3.tractor supply store
A place where we can keep open land and be self sufficient. 40-49 White 112

1.small feel

2. Quiet

3.not far from stores

1.things to do for teenagers

2.bikability/ walkability

3.keeping quiet small feel

1.mini/ glow put

2.work programs for young

3. A nice community for families of all ages. With lots of activities for all ages. Abilities for teenagers to work, not just fast food.

Being able to bike or walk to nice parks and/or local owned establishments 92595 40-49 White
113

1. Location

2. Weather

3. Community

1. Traffic

2. Schools need better
scoring

3. High density housing is
not the answer for either

1. Fireworks

2. Family neighborhoods

3. Parks-I know some are
on the books
Dont make the mistakes Temecula did, and Murrieta is currently on the verge of… Growth is great, and needed, but dont block main access arteries without the proper additions for egress. 92595 30-39 White 114

1. Events, Eateries, Family
owned businesses

2. People I've met since I
moved here.

3. Outdoor Activities

1.Traffic, to many
speedsters

2.Developement - stop
building houses.

3. Noise Ord., Vandels, etc

1. More affordable Venue's

2. Safer streets for cyclers,
walkers, horses & riders

3. Safer neighborhood's
If I see it in my lifetime. Pretty much what we have already discribed in the 2040 update. Our streets need to become alot safer, easier commuting throughout our 3 cities, more available & affordable transportation with in our 3 cities.

Stop taking away OUR open space!! When I moved here in 2014/2015 it reminded me of the small city I moved away from, we are now turning into yet another large city that will eventually be over run by gangs we don't need or want. I love my little town and would like to see it not get way overgrown. There's enough empty homes to fill we don't need anymore that will sit empty and clutter our area. Enough said . So now to test you??? How many of you actually take the time to read my comments or any of the other comments that we sent in. 60-69 White
3547
APPENDIX A: Let's Envision Wildomar Survey Responses 13 What do you like about
Wildomar?
What challenges face the
City of Wildomar?
What would you like to
see more of? What’s your vision for Wildomar? Where do
you live?
What is
your age?
How would you identify your
race/ethnicity?
115

1. Neighbors helping
Neighbors

2. Community Service

3. A couple of very involved
Councilpersons

1. Growth needs to attract
higher level job opp.

2. Too many Car washes &
cannabis shops

3. Road conditions

1. Better Roads

2. Entertainment

3. Parks & Recreation
Department
A major thing I would like to see is a serious Parks and Recreation department like Murrieta or Lake Elsinore. Residents currently can attend classes, sports etc. out of our city at a non-resident rate but it’s time Wildomar has their own! Wildomar is in major need of Entertainment such as a theatre, splash pad, ice rink (this would draw so many kids/adults in for Hockey, ice skating lessons, public skating, broom ball, birthday parties, etc. currently everyone in Murrieta, LE, Temecula etc has to drive to Riverside or further and we do it and those cities benefit. Get it here before one of our neighboring cities gets one!
92595 50-59 other
116

1. The wonderful
community

2. The location

3. It's small town rural feel

1. Funding

2. Crime/lack of law
enforcement

3. Bringing in positive
economic development

1. A downtown

2. Recreational
activities/programs
through parks & rec

3. A Sportspark &
Community Center
In my vision for the future of Wildomar I see it having a beautifully designed, designated downtown space filled with shops and restaurants. There will be live music and farmers markets and Santa during the holidays where the community can gather and enjoy. There will be positive growth and expansion including new and upgraded schools, but the city will still maintain its rural, country feel. There will be more green spaces, less empty dirt lots. There will be a Sportspark, a Community Center, and there will be programs and activities offered through Parks and Rec that the citizens of Wildomar can take advantage of. Finally, my vision of Wildomar includes it developing something that makes it stand out and sets it apart from neighboring cities. Something like a rodeo that fits it rural feel but is not offered elsewhere. 92595 30-39 White
117

1. Ruralness of area

2. Family friendly

3. Independent business
owner support

1. Traffic control

2. Road surface updates

3. Slow business growth

1. Tighter measures on
auto storage in residential
areas

2. Sidewalk additions

3. Increase in green areas
City council members who support the general plan and show community involvement 92595 60-69 Hispanic_or_Latino 118

1. Quiet Community

2. Small Community

3. Still Growing

1. Traffic on two-lane
streets

2. Large trucks on two-lane
streets

3. More revenue for the city

1. More businesses

2. More participation by
younger residents

3. My vision for Wildomar is to see the city continue to grow into it's own and to be true to what Wildomar is about. 92595 50-59 Black_or_African_American 119

1.small town

2.still has open spaces

3. 1.increase school rankings

2.improve all street
maintenance

3.More Youth activities

1. Sports Park E of the 15 as
was planned many years
ago.
2 Main Street where you
can walk, shop and eat

3. Beautify the main thoroughfares. Plan for a small town Main Street with upscale shops, easy free parking, pleasant walking/resting areas and unique eateries, nice restaurants and bakeries. Why fight traffic to go to Temecula, stay in town for a night out. No more storage development. Deter crime with visual presence of police officers patrolling all over town any time of day.
60-69
120

1.Rural

2. Not far from SD or LA

3. Very close to my work

1.leadership doesn’t care
for residents

2. Those running our city
are OVERPAID

3.very close to Lake Elsinore

1.Designated Sheriff patrol

2. Child Development
Centers

3. Things for kids, &
preteens to do(youth
center)
We need less car washes, more non-chain restaurants, and more social workers/mental health support for the Homeless that WALK up/down Catt rd all day long. Wildomar has NOTHING for students to do when school is out. There are no tennis or pickle ball courts for residents recreation. Keep the rural parts rural, and keep out the investors looking to place businesses that we don’t need (who needs ANOTHER carwash when Clinton Keith has 5 in a matter of BLOCKS??) 92595 40-49 White
121

1. My neighbors

2. Close but far enough
away from stores

3. Freeway is close for
commute

1. Updating infrastructure

2. Shortcomings of civil
engineering

3. Keeping contractors on
task

1. Shooting range

2. Smooth roads

3. Bundy Canyon/Sellers
opening up!
Additional fire and police station
Small scale dog parks
Less housing construction
92595 40-49 Two_or_More_of_the_above_Rac
es/
122

1.more affordable homes

2.larger home lots allow
space from neighbors

3.growing shopping &
restaurants

1.infrastructure: roads
cracked, torn

2.growing homeless
population

3.balancing growth, rural
benefits

1.noise ordinance (loud
neighbors)

2.improve roads, sidewalks
to residential streets

3. homeless issues
I live in Northern Wildomar on a .8 acre property. Do NOT want area near me to change zoning and suddenly have apartments or multiple homes on lots--want to keep the rural nature. At same time, improvements to roads, adding sidewalks, and other help for making the neighborhood nicer would be great. I want growth for some shopping and restaurant options but not at sacrifice of quiet, larger lot 92595 50-59 White
3548
APPENDIX A: Let's Envision Wildomar Survey Responses 14 What do you like about
Wildomar?
What challenges face the
City of Wildomar?
What would you like to
see more of? What’s your vision for Wildomar? Where do
you live?
What is
your age?
How would you identify your
race/ethnicity?
123

1. 2.

3. Streets need repairs 1.

2.Streets need repairs

3.streets need repairs

1. Repair the streets

2. 3.

Nice roads less housing and traffic 92595 60-69 White
124

1.calm, relaxing
environment

2. Home prices More bang
for your buck

3.palomar shopping center!

1. Fwy Traffic

2. Not many Fwy On & off
ramp

3. Pot holes

1. Walking trails (palomar
example)

2. 3.

I love it Wildomar as is not much change needed.. 92595 40-49 American_Indian_and_Alaska_Nat i
125

1.Laid back

2.Family-oriented

3.Safer than some
surrounding areas

1.Crime/Homeless

2.Corporate development

3.Building too much in
small spaces, feeling
cramped

1.Planned community

2.Infrastructure like better
roads

3.Community center with
indoor gym
To have no smoker/drug shops esp. next to schools. To not be crammed in. To be smart in what and where business are allowed to build, and making sure infrastructure is in place before building new residential communities. To have a beautiful community with open roads that have sidewalks, trees, and nice fencing. I think Wildomar residents would like to keep our more rural feel while still having access to good schools, and safe uncrowded places to eat, shop and live. Make sure that new construction/businesses makes sense based on where residents currently live and space available - it should not be so disruptive to our daily lives or make us feel so overcrowded, so that we want to move away. Many of us moved here to get away from the overcrowded crammed in feeling. It should not take such a long time to drive only a few miles in our community.
92595 50-59 White
126

1.rural feel

2.small town feel

3.local run businesses

1.general infrastructure

2.well planned downtown
area

3.lack of opportunities for
children and seniors

1.community center
building / senior center

2. historical society

3.preservation of
community heritage
Less urban sprawl and strip malls
More concise zoning
Focus on community heritage and history
Place for families can learn and grow together and feel supported by their community 92595 40-49 White
127

1. Patriotic

2. History

3. Safety

1. Liberalism

2. Change

3. Indoctrination

1. CCW citizens

2. Cops

3. Fix roads
Same as her neighbor Murrieta. Be patriotic and stay patriotic. No room for indoctrination like city of Temecula. 92595 30-39 Hispanic_or_Latino 128

1. Small town feel

2. 3.

1. Activities for young
people

2. Senior Center

3. 1. See above

2. 3.

Small town but activities for all in our community. 92595 60-69 other 129

1.The Ranch/Craftsman
Style homes.

2.The multi-purpose trails.

3.The positive energy for
Parks and events.

1. The lack of new voices
on City Council.

2. Industrial job growth.

3. Additional parkland
availability.

1. Industry

2. Multi-purpose Trails

3. Road Repairs
A well maintained community with nice smooth roads, plenty of parks and trails and a high quality industrial manufacturing sector.

I also believe we should have a high school with either the name of the city, or of a beloved person from the past, not a neighboring city's name. Elsinore lost the right to keep the name of the school when they dropped Wildomar from their sphere of influence.

I would like the City to openly push on the County to create a Regional Park where they had initially planned to. The college won't need that property, and has yet to purchase it. It was purchased to be a Regional Park with horse trails and a rodeo area and that would be a good fit here.
92595 60-69 White
130

1. It’s home, been here
since ‘85

2.?

3. DeJongs Chocolate Milk

1.City allowing builders to
close roadways with no
repercussions if they pass
deadlines.

2. 3.

1.City Hall working on
Friday.

2.Creating a parks & rec
program for kids

3. More visibility into top
issues
. 92595 30-39 other
131

1. Small town feel

2. A little less traffic
congestion

3. Slower pace

1. Too much housing being
planned

2. In need of a variety of
good restaurants

3. More parks

1. Open spaces/ green
belts/good parks

2. Trees!!

3. Community spaces with
quaint shops and open
areas
Keep the small town feel, add more green spaces keep businesses in business district not neighborhoods. Keep new housing to a minimum and make it single family not high density. 92595 50-59 132

1. Home town feel

2. Proximity to the freeway

3. Potential to grow

1. Available land

2. No real "place to go" =
i.e. downtown

3. Have to go elsewhere for
entertainment

1. Parks / Amenities

2. Job opportunities

3. Niche Businesses
(different from other cities)
A vibrant destination with rural roots and practical growth 92595 30-39 White 3549
APPENDIX A: Let's Envision Wildomar Survey Responses 15 What do you like about
Wildomar?
What challenges face the
City of Wildomar?
What would you like to
see more of? What’s your vision for Wildomar? Where do
you live?
What is
your age?
How would you identify your
race/ethnicity?
133

1.small town feel

2.not overly crowded

3.proximity to other larger
cities

1. Some roadways are
outdated

2. School system under
performing

3. 1. Police Services

2. Community events

3. Improved parks and commerce (grocery stores) etc. 92595 30-39 134

1.We know our neighbors
2 City council meetings are
easy to attend
.

3.We know our city
representatives

1. We legalized marijuana
in our city

2. Because of Sacramento,
we are short of funding the
city expected

3. 1.Candidate debates for
city council and school
board

2. 3.

Family values, family friendly 92595 60-69
135

1. semi-rural nature of the
community

2.mountain views

3. convenient shopping
opportunities

1. infrastructure

2. road maintenance (more
frequent, please)

3. density of residential
new construction

1. Fix this darned survey--
can't input

2. more consistent road
maint

3. police presence to deter
crime
Looking forward to seeing the medical complex build-out on Wildomar Trail. Surveys that aren't limited to 100 characters per field--ridiculous! 92595 60-69 White
136

1. The rural areas.

2. Close to my parents.

3. I’m close to my kids’
school, I love their school.

1.DRUGS

2. Police response time

3.homeless

1.we NEED police presence

2. Help with the
DAILY/NIGHTLY theft

3. Actual help when citizens
have an issue.

I’d love to see Wildomar slow down. Less building, more taking care of what we already have! Stop building parks until we get the druggies out of the ones we have. Keep the history of Wildomar alive. Wildomar needs to use stepping stones. Clean up the messes first, THEN build.

I want my children to grow up here, like I did. But Wildomar isn’t the same. There is drugs, and crime everywhere and nobody who could do anything about it bats an eye.
92595 30-39 White
137

1. 2.

3. 1.growth

2. Infrastructure projects

2. 3.

1.paving Clinton Keith fro
the 15 over pass Eastward
to the Muriettia boundry.

2. 3.

More business oriented 92595 70+ White
138

1. Close to freeway.

2. Affordable homes.

3. 1. Poor city roads,
disjointed community.

2. Not enough high-paying
jobs.

3. Poorly-rated schools.

Clinton Keith Rd needs to
be expanded to 2 lanes in
both directions from the I15 to the border of
Murrieta.

School ratings that rival Temecula and Murrieta. Better bike paths and trails. Attract more career-oriented businesses, rather than service jobs. Temecula is dragging their feet on a new competition-level aquatics center. Maybe Wildomar should build one and built up business around it. Brush should be cleared regularly, it's a fire hazard. Give us a reason to live, work, and play in Wildomar - instead of just live. 40-49 White
139

1. Rural

2. Safe

3. Quiet

1. Too much development

2. Crime

3. Potholes in roads

1. Police

2. Community events

3. Open spaces
Keep it rural! No more multi-unit housing or big development. 92595 60-69 White 3550
APPENDIX A: Let's Envision Wildomar Survey Responses 16 What do you like about
Wildomar?
What challenges face the
City of Wildomar?
What would you like to
see more of? What’s your vision for Wildomar? Where do
you live?
What is
your age?
How would you identify your
race/ethnicity?
140

1.the open surroundings
and scenery

2.a small hometown feel,
history

3.a growong young diverse
cummunity

1.growing infrastructure

2. lack of areas for the
cummunity to meet/ shop/
play/ entertainment

3. Revenue

1.officials going into
neighborhoods, meeting
the community

2.improved roads, street
signs
afordable homes
To create an area or district where we have an official wildomar Downtown walk and convention center and maybe even a (music hall / arena / amphitheater ?) to bring people together and money into the city while creating local jobs. Most people have no clue about wildomar. They drive by to other venues! Lets make us a place to stop and know! Improved roads are a sign of organizational strength and pride. Thats what people see and feel coming into our city.

Next is the cleanliness we keep in our right ways.

Next comes openess of our surroundings, we can be a complex busy city or keep it simple home town feel with affordable homes and small businesses districts to support our local community needs.

People love history and entertainment but also a safe and clean community to live and visit.

So Lets bring those to our community and our visitors of today and tomorrow! When this happens lets celebrate with a festival and parade, this could be an annual event thru our downtown walk! 92595 40-49 White
141

1.Quiet

2. RURAL

3. Light traffic.

1. High density
development

2. No green space

3. Putting corporate greed
ahead of small town
atmosphere.

1.more open space,
preserves

2. More jogging/biking
paths

3. Small business
Rural, stop high density housing. Preserve open spaces and wilderness area. 92595 60-69 other 142
before Richmond
homestead on Palomar it
was quiet
don’t like the assholes that
voted the Kaiser building in

1.Paid for city council
members

3. We need all new city
council.

1.more parks

2.Less corporate whore and
businesses

3. New city council
members.

Well you guys have ruined a lot of it. For 12 years we watched lies about the brown house and then the Kaiser buildings.

Using our tax dollars to change Baxter road to wildomar trail which was a complete waste.

What are we wanting people to pull off the freeway and go see the Kaiser buildings.

You guys are idiots and can’t manage city planning better that a 3 year old. 40-49 White
143

1.Quiet, easy freeway
access, close to shopping

2. 3.

1.too much “filler” growth,
like car washes, storage
facilities, not enough
deputies

2. 3.

1.slower growth, BETTER
restaurants

2. 3.

It stays smaller then big Murrieta/Temecula it is not filled with taco shops, & liquor stores 92595 70+ White 144

1.rural
Family community
Law abiding

2. 3.

1.roadwork

2. 3.infrastructures
Public pool1.

2.nice dog park

3.water park for families
To keep it a rural town without industrial buildings 92595 50-59 Hispanic_or_Latino 145

1.Nothing now that it is a
city

2. 3.

1.corrupt politicians

2. 3.

1.less building

2.leave empty land alone

3.go back to being county
not city
Leave vacant land vacant . Stop all this needless building.. we need empty spaces.. why build more home ,apartments, businesses if we keep having a drought.. just a bunch of stupid ass politicians making money.. leave things alone.. I used to like Wildomar when I bought here 30 years ago but not anymore.. it went to hell when it became a city.. I would love to look at a vacant lot than have a damn neighbor so close they can hear more fart!! Stop building!! American_Indian_and_Alaska_Nat
i
146

1.Still a quiet community

2.Not bombarded with
homelessness/crime

3.Solid great restaurants

1.Not as much stuff to do

2.Not that many significant
jobs that are higher paying
3Solid community
statement
1More community
activities for residents
2small business showcase
like downtown Murrieta
3Arts,music fests
My vision is that there would be a set spot for creativity to flourish. Where everyone could have a safe haven being outside but also having ample shade to withstand heat. Having activities for everyone that coincides with the season and weather of Wildomar.
92595 40-49 Asian
3551
APPENDIX A: Let's Envision Wildomar Survey Responses 17 What do you like about
Wildomar?
What challenges face the
City of Wildomar?
What would you like to
see more of? What’s your vision for Wildomar? Where do
you live?
What is
your age?
How would you identify your
race/ethnicity?
147

1.small town

2.frendly people

3.low crime

1.Growth of people and
building

2.Road conditions
expansion and repair

3.Community senior care
programs

1.Less residential growth

2. Less commercial growth

3. Return to small town
Return to small town vision. Stop trying to become like surrounding city's. IE Murrieta. Slow down all the building residential and commercial. Fix the existing roads. 92595 70+ 148

1. Farm/horse, rural country

2. Not a lot of traffic to get
where I need to

3. Small-town vibe

1. Over-development of
unnecessary places/things,
brand new houses

2. Keeping the roads pothole free

3. 1. Community events

2. Gardens/more
trees/fruit trees

3. Better paved roads
Stop building so many new houses… protect/repair/upgrade what is already here… more paths for horses… add more trees, flowers/gardens & DEFINITELY edible plants & fruit producing trees for everyone!! 92595 30-39 White 149

1.rural

2.less traffic

3.family oriented

1.needs money

2.getting more mom and
pop restaurants with cool
/beach vibes

3. Infrastructure needs
work

1. Mom & pop bar and
grills with Beach vibes

2. Specialty :Trader Joe’s
,sprouts

3. Maybe our own water
park
May be a combination of all of it,cool restaurants bar and grills, Some businesses such as your Kaiser buildings but not too much more of those and everything needs to be designed where it’s nice and not junky looking’s with a nice coloring (not blue and red).

Need to fix up the corner next to post office, even if a parking lot is put in could be tastefully done instead of leaving it a dirt lot.
92595 60-69 White
150

1. Friendly

2. 3.

1. Communication about
projects

2. Overgrowth of
apartments and houses

3. Lack of planning

1. Open space

2. Rural atmosphere
preserved

3. Outdoor venues/farmers
markets etc.

A downtown that preserves a rural atmosphere - independently owned businesses. Nix the Arco/7-11 on every corner.

Create am ambiance that encourages community interaction - right now, everything is hodge-podge. The area with City Local is about the only nice place to go to socialize. Palomar could be revitalized in a way that encourages local shops. 151

1. It's rural but has the
benefits of city life.

2. Small town feel

3. 1. Illegal immigration

2. Crime

3. 1. Small family farms

2. Gun ranges

3. A place that looks and feels like a small town in classic Norman Rockwell's America with some modern aspects. More local farming with farmers markets.
152

1. Quiet

2. Lack of traffic

3. Weather

1. Too long for road
construction

2. No pedestrian paths
along Bundy Canyon

3. 1. 7/11 store

2. Not enough food choices

3. Increase park amenities
More pedestrian paths for running and biking along Bundy canyon. Would be nice to have designated path for bikers and runners that encircled Wildomar from Bundy canyon to Clinton Keith 92595 30-39 Black_or_African_American 153

1. Rural atmosphere

2. Small town feel

3. Mountain views

1. Traffic

2. Commercial zoning

3. Homelessness

1. Police; Security

2. Restaurants

3. Open space/parks
Quality restaurants so we don't have to go to Murrieta/Temecula. Keep our tax dollars here. Infrastructure keep up with growth, i.e., roads, etc. 92595 60-69 White
154

1. Small Town

2. Neighborliness

3. Climate

1. Water

2. Traffic

3. Lack of Commercial
Development

1. Multi-use trails

2. Parks

3. Large Retail
A walkable town that can meet the needs of the populace without sending them driving to other towns. 92595 60-69 White 155

1.small town

2.quiet

3. 1.growth

2. 3.

1.road maintenance

2.cleanup roadside

3. Keep open spaces available by not developing every inch of land in the city. 92595 40-49 3552
APPENDIX A: Let's Envision Wildomar Survey Responses 18 What do you like about
Wildomar?
What challenges face the
City of Wildomar?
What would you like to
see more of? What’s your vision for Wildomar? Where do
you live?
What is
your age?
How would you identify your
race/ethnicity?
156

1. The weather

2. My home

3. My Councilman

1. Insufficient police staffing

2. HUGE road maintenance
backlog

3. Dearth of city services &
amenities

1. Proactive policing &
Traffic Enforcement

2. REAL Road maintenance

3. Municipal services and
amenities
NOT WILDO-COMPTON!
A city where existing single-family residential neighborhoods are protected from “slum-hood” resulting from multi-unit construction on single family home zoned properties, AND close proximity three-story abominations (think Tres Lagos and incompatible diesel Truck Stops!
A city where much of the existing rural zoned properties are maintained or developed as such by those with the resources to do so, with my thanks, their aesthetics benefiting the entire community.

A city which has not “pissed” away all the commercially valuable freeway/offramp adjacent properties to low city revenue producing development, (think three story apartments and medical buildings).

A city with well-maintained roads and right-of-ways.

A city with enough fire stations.

A city with enough policing.

A city with sufficient parks, not necessarily a requirement that every playground be covered with “Gucci” sunshades. (:>) Actually, A WILDO-MURRIETA!
I am 73. Ce la vie! Never going to happen!
92595 70+ White
157

1. Smaller town

2. Homes are reasonably
priced

3. Close to everything

1. Getting overpopulated

2. Not getting enough
votes for taxes that will
help our city

3. 1. Street lights

2. Sidewalks

3. Better roads with curbs
To clean up some of the poorly kept houses and properties. Adding lamp posts or some kind of lighting. Improving our streets by adding curbs and sidewalks and more bike trails. Keeping our streets clean from trash. Building more stores and restaurants and please no more churches.
40-49
Native_Hawaiian_and_Other_Paci
f,White,Two_or_More_of_the_ab
ove_Races/
158

1. Trees!

2. Birds!

3. Small town

1. Over development

2. Avoiding that "suburb"
feel

3. 1. Bike lanes

2. A town square with
locally owned businesses
and regular events.

As stated above. 92595 50-59,60-69 White
159

1.small town feel but not
back country

2.mostly quiet

3.responsive city employees

1.need more revenue
sources

2.an attractive sports
complex

3. Road maintenance

1.revenue sources

2.variety of shops..not just
oil change or car washes

3. More usable parks
Wildomar needs to continue growing. As much as I love the small town feel, we need revenue. We need to attract people into our city. A sports complex that would allow for tournaments as well as a hotel for them to stay... money maker.
92595 50-59 White
160

1. Close proximity to larger
cities

2. Small town

3. Relaxed

1. Need more sources of
revenue

2. Need grocery stores

3. Need shopping areas

1. Grocery

2. Retail

3. Nice roads
Any future housing builds to include property so you’re not right on top of your neighbor.

Sidewalks, parks, recreation for kids. 92595 30-39 White 161

1. Small town

2. city is trying to make it
better

3. The community activities

4. Our P.O. staff is the best

1. Crime & vandalism

2. Roads & traffic

3. Forgetting about
improving older areas but
building new

1. Better restaurants not
fast food

2. City center or gathering
place

3. Community activities
we are an "in betweener town" I feel like we're trying to grow up to be our own place & have all the things here, but honestly when I go out, I ask myself do I need to go to a surrounding town to do what I need to do. It would be nice to keep the $ here. I also feel that the city is trying to make this a better place, but have forgotten about some of the older areas that have become worn down & are eye sores.

With the increase of homes, have come the increase of crime & vandalism. The police that we do have are stretched so thin. They are great but just not enough.

It would be nice to have some sort of city center area. Our town seems like more of a mish mash. No real heart of the city. Murrieta created one. Temecula and Elsinore's old Towns are theirs. What is Wildomar's? The bell at the elementary school? The park? The post office/cemetery?
We love living here. love our neighborhood but glad we raised our kids in Murrieta because there was so much to do without leaving town
92595 50-59 White
162

1. Less traffic than
surrounding cities

2. Small town feel

3. View of the Ortegas

1. Road conditions

2. Crime

3. 1. Safe bicycle / pedestrian
routes in all neighborhoods

2. Enforcement of stop
signs

3. I would love for Wildomar to remain a place where horses, goats, and chickens are welcome. I hope that in our quest to attract tax dollars the city needs, we don’t lose touch with our roots. 92595 50-59 White 3553
APPENDIX A: Let's Envision Wildomar Survey Responses 19 What do you like about
Wildomar?
What challenges face the
City of Wildomar?
What would you like to
see more of? What’s your vision for Wildomar? Where do
you live?
What is
your age?
How would you identify your
race/ethnicity?
163

1. Nice parks

2. 3.

1. Finish the construction
by Bundy canyon.

2. Junk in yards

3. Pave the 20% of dirt
roads in wildomar.

1.Pave the dirt roads

2. More trees

3. PAVE THE DIRT ROADS
Stop paving the same roads and actually pave the dirt roads in wildomar. It's ridiculous! 92595 30-39 White 164

1.Small town feel.

2. Businesses work with the
community.

3. Fun small town events.

1. Bad roads

2. Saving funds for the
future.

3. Diversifying businesses
—no department stores
here

1. A long term vision

2. Better use of zoning
along Clinton Keith

3. More diversity in
businesses.

Keep some areas rural —more on the west side
Increase other areas in diversified businesses—east side Define our purpose, mission for long term— what is the City of Wildomar going to be known as? 92595 60-69 White 165

1.it’s a farm like feel

2. We have great
community activities

3. Great place to live

1. Too much new
construction

2. Crowding

3. Slow construction

1. 2.

3. A small family community 92595 30-39 Hispanic_or_Latino 166

1. 2.

3. 1.

2. 3.

1. 2.

3. a small city with connections to rural areas and wildlife corridors, an emphasis on education and the history of the area
167
Small town feel

2.close enough to
amenities

3.good air quality

1.overgrowth

2.small town political views

3.public transportation

1.keeping it rural

2.limit of new housing

3.public transportation
Keeping a rural atmosphere. A little more response from police dept. 92595 60-69 White 168

1. Small town feel.

2. Generally the weather is
nice.

3. Limited crime

1. Tax revenue

2. Traffic issues

3. Getting developers
interest

1. Timed lights

2. Limiting light pollution

3. More cleanup days
Wildomar is a great little community. How viable is it long term I'm not sure. It would be great if the city could be totally self sufficient but I'm not sure if there are enough resources. I personally would love a drive in movie theater and a really great network of hiking trails.
92595 40-49 White
169

1. country

2. my town

3. people enjoy literature

1. We need a city library

2. We need to foster
literacy at a city level

3. roads are terrible

1. better roads

2. city library

3. literacy programs
better roads and a CITY library 92595 50-59 White
170

1. Rural

2. Open space

3. Less traffic

1. Not having a municipal
library

2. Growth without
infrastructure

3. Keeping Wildomar rural

1. Municipal library!

2. Homes with acreage

3. Natural spaces
First, I would like to see Wildomar remain rural/semi-rural. That's why I chose to live here in the first place. Secondly, we need a municipal library. The county library is too small to handle the growth of the city, and due to RCLS constraints, does not meet the needs of our community at large. Having a city library would allow for more community involvement with more resources for all demographics. Libraries are now community centers, not just places to read books. It would be great to have a larger space to incorporate a maker space, larger community room, more programs and to let the community know that we care by offering these free services. 92595 40-49 White
3554
APPENDIX A: Let's Envision Wildomar Survey Responses 20 What do you like about
Wildomar?
What challenges face the
City of Wildomar?
What would you like to
see more of? What’s your vision for Wildomar? Where do
you live?
What is
your age?
How would you identify your
race/ethnicity?
171

1. the open feeling of the
city

2. cleanliness of the roads

3. the city has a hospital

1.no sense of community
or soul

2. There are no parks or
community centers or
pools ,

1. parks

2. 3. community pool, adult
center, youth
A city that provides its citizens a healthy sustainable and safe place to live, with parks and trees and ponds and fishing, and trails..

A community that thrives in building sustainable areas that all people can enjoy and betters the planet at the same time.

That gives families a place to play and grow and learn.

A city that prides itself in community building and providing its children places to learn and be safe, outdoor spaces that give families a reason to stay in the city on the weekends and programs that enhance the lives of all that live here.

A world class library,
Amphitheater
Town Center
Adult Care Centers
Youth Center
Community Pool
Baseball fields
Soccer fields
Trees planted for future cooling of the whole city
Fruit trees planted so the hungry and pick them.

Services provided by the city to enhance the lives of all 92595 60-69 White
172

1.The Library

2.The many food options

3.The parks

1. Expansion

2.Gentrification

3.Water Conservation

1.Less houses

2.More scenic views

3.Low rent
A place that stays wide and doesn't try to be what its not to fill people's pockets. Selling out all our land and blocking our views of the mountains. 20-29 White
173

1.helpful, friendly neighbors

2.interesting history

3.rare traffic jams

1.providing high quality
amenities

2.addiction-related crime
and homelessness

3.transportation

1.bigger library

2.easy battery/bulb
recycling & redemption of
CRV items

3.classes/rec./enrichment
programs
Capitalize on scenery, weather, location, history (1800s female cofounder was college grad/successful author of stories set in places like Wildomar).

Let's build a civic center in historic area (Palomar./Wildomar Trail), by post office, cemetery and school bell.. Add a city hall, library/rec. center with cost-efficient multi-purpose spaces for meetings, classes, shows, historical displays and income-producing events (weddings, quincañeras). Include a playground for kids and a courtyard "playground" for adults, featuring a bistro, outdoor movies, performances, weddings, etc. Create a nearby transit hub linking Tem. Valley to metro area transit (Metrolink, Coaster, trollies) to provide viable transportation for business (commutes, business travel, medical appts.) and recreation (airports, beaches, cultural sites). Entice diverse jobs (min. wage to high-paid careers) with these amenities. Long commutes harm physical/mental health, so quality mixed use development is encouraged..
92595 60-69
174

1. World Harvest Church

2. Historical Reads

3. Diverse neighborhoods

1. Aged/tattered roads

2. Open land that isn't very
used

3. more opportunities to
build business locations

1. build a community
garden

2. A sports park for the
community to gather and
make memories

3. My vision for Wildomar is for the city and its people develop in a way that makes people want to "cruise through" the city 92562 20-29
175

1. Small

2. Walking, hiking

3. Great Trails

1. Growth

2. Signal lights

3. Pedxing, traffic

1. Open Space

2. Events, Outdoor

3. Interaction w/city
(Walking, hiking, biking
trails)
To ensure our small city stays rural, less housing 92595 60-69 176

1. Small

2. Friends

3. Trails

1. Growth

2. Signal lights

3. Traffic

1. Open spaces

2. Events community

3. More hiking/biking trails
Stays rural, less housing 92595 60-69
3555
APPENDIX A: Let's Envision Wildomar Survey Responses 21 What do you like about
Wildomar?
What challenges face the
City of Wildomar?
What would you like to
see more of? What’s your vision for Wildomar? Where do
you live?
What is
your age?
How would you identify your
race/ethnicity?
177

1. Less traffic

2. Small town feel

3. New stores

1. Fence laying orange st

2. Clean up orange/bundy

3. Walnut st needs
Resurfacing

1. Roads resurfaced
(Walnut st)

2. Clean up

3. Continue with updating and making our city look nice. We’re happy to see nice changes along Grand. We drive bundy canyon to orange street daily. It’s awful. The fence has been laying on the ground for years 92595 50-59 White 178

1. Trails

2. Some undeveloped space

3.community activities in
the park

1. Loss of dark skies

2. traffic chokepoints

3. bike and walking trails
not fully connecting

1. Attention to light
pollution

2. larger conservation areas

3. collaboration with other
cities on lighting
Preserve the rural and open space character where possible. One character that can be preserved without affecting growth is dark skies, as this requires only attentiveness to the type of light fixtures. 92595 60-69 White 179

1.farming

2.quiet

3.small

1.dirt roads remaining next
to new builds

2.pot holes in streets

3. 1.keeping the city as is

2.no more new
construction

3. Improving residential
streets
Everything is good as is. I would like to see the city stay the same and keeping the open farm life the city has. It’s disappointing seeing the trees gone and new construction going on off the wildomar trails’s freeways exit. The new build will not match the city of wildomar for the area that it’s being added to. Maybe it could have been an addition near the inland valley hospital. I would like to see roads fixed and paved roads added to the residential homes near Gruwell. 92595 30-39
180
Open space, enviormental
strength,
Vision for future
Attention to the peoples
opinion
Great city
Water, green space,
carbon, traffic control1.

2. 3.

Kindness, and support of
neighbors1.

2. 3.

Growth, vision, strength in numbers 92601 70+ White
181

1. Community

2. Safe small town

3. Open spaces

1. Higher density building
causing damage to roads
and traffic

2. No community center

3. Revenue

1. Old town strip like
murrieta

2. Equestrian spaces

3. Community center with
programs for adults and
kids
Keep it rural and take it back to its western roots. We can be a refuge for people to visit who need a break from the crowded city (Temecula). We can host outdoor rural events for those inside and outside of our city. 92595 40-49 White 182

1. 2.

3. 1. Getting Bundy Canyon
project done

2. Bus route up Bundy to
MSJC

3. More businesses

1. Parks

2. Bundy bus route

3. Better traffic flow —
connect Bundy wiith
Clinton Keith
Wonderfulness 60-69 White
183

1.small

2.quiet

3.easy access to 15

1.unfinished construction
areas

2.not enough dining

3.no outdoor rec

1.walking running path

2.wider road on Bundy
canyon

3.more food
Small but vibrant city with outdoor activities such as walking and running paths 92595 30-39 Black_or_African_American 184

1. Open Space/ Rural

2. Dark skies

3. Landscape

1. Roads

2. Accumulated trash on
properties

3. Maintenance

1. Sidewalks

2. Paved Streets

3. Stores to Shop
Downtown center, paved roads, little boutique shops.
185

1. Rural

2. Friendly

3. Mostly quiet

1. Too much construction

2. Losing the country
atmosphere

3. Noisy and more traffic
and unfriendliness

1. Bring back the country
atmosphere

2. 3.

I moved to Wildomar from Orange county to get away from the hustle and bustle of a big city. Wildomar is now getting too much like Orange county. I would like to see construction halted to reestablish and maintain the country atmosphere that Wildomar once had.
92595 70+ White
3556
APPENDIX A: Let's Envision Wildomar Survey Responses 22 What do you like about
Wildomar?
What challenges face the
City of Wildomar?
What would you like to
see more of? What’s your vision for Wildomar? Where do
you live?
What is
your age?
How would you identify your
race/ethnicity?
186

1. I was able to afford to
buy a house here.

2. It's located near family.

3. The traffic isn't too bad.

1. Some properties look
like trash.

2. Not very
walkable/bikeable.

3. Looks like a wasteland
(drought).

1. People taking down
trashy, divisive political
flags and slogans.

2. Sidewalks and bike lanes.

3. Rain.

My vision would be for people to take pride in their community, clean up their trashed out properties, have the streets looking more finished with sidewalks and gutters, more living trees, take down all the dead trees and bushes everywhere. 92595 40-49 White 187

1. small-town feel.

2. The members of the city
council.

3. 1. Not enough money for
more police.

2. 3.

1.faster police response for
prowlers, illegal fireworks,
and racing cars.

2.more Public
transportation.

3. I like where the city council is leading us. 92595 30-39,60-69 White 188

1.Clean

2.Growing

3.New
1attract more people from
surrounding City's

2.There needs to be more a
draw to City

3. Community Support

1.Medical

2.Office

3.Retail
I think Wildomar needs to have a draw to bring people there. We have Plenty of Restaurants! We need more Commercial retail , Shops, gyms, Theaters to bring people to town. The should help businesses survive give people to do living in Wildomar
92595 50-59 other
189

1. Stores are close
2 Neighbors

3. it's small

1. homelessness

2.burgleress

3.drugs

1.City wide Major Art Work

2.widing of Palomar road

3.less gas stations and
more electrical stations
Defiantly more open space epically for dogs and animals. A lot more (if you even had any) art work such as statues and paintings and a Wildomar Logo put every where. Lets have better services for the elderly and help them get out of their homes. It is not easy.
92595 60-69 White
190

1.wide open spaces

2.historically slow growth

3.no big shopping centers

1.traffic and speed,
thoroughfare

2.open land disappearing

3.growing too fast

1.septic changed to sewer

2. Traffic enforcement

3.programs for seniors or
shut-ins
It's difficult for me to envision Wildomar in 2040 because in all likelihood I won't be here. I know some want to see growth but I miss the rural community I fell in love with, the open spaces and quiet, the breathtaking sunsets. I used to park on McVicker and watch the sun go down. A new housing project will block that view. Give the community a facelift and improve roads to entice small businesses that will draw consumers for financial growth and stop building new communities. That's my vision.
92595 70+ White
191

1. Small town feel

2. Don't have the
congestion like neighboring
towns.

3. Small businesses.

1. Stop residential bldg.

2. Stop commercial bldg.

3. Keeping our small town
small. Take another exit!

1. More Agricultural family
business.

2. Neighbors on horseback
again.

3. More PD/Sheriffs Clinton
Keith
To remain a small town where we know/recognize each other. Support of our family businesses.

To not be another commuter, fast food, cheap stores exit on the I15 corridor. There's enough residential/commercial bldg started/finished. Needs to be a cap! Plans to make us another congested exit off the I15 is deplorable. Stop it! We need our fresh fruit/vegetables business back, family owned businesses and safe neighborhoods.

There's already a rise in crime and transients.

There's plenty of hospitals, medical buildings, gas stations, dollar stores and retailers. You can travel to the next nearest exits and see the same cheap retailers, home improvement and big box stores. Why the need to pollute our lovely town with what the is already available nearby?
Catering to commuters who move here for less expensive living for their tax dollars to build us into what they left and what they bring with them is an obvious money grab and needs to stop.

Keep Wildomar small and family friendly.
92595 50-59 White
192

1.mountains

2.small town

3.wildlife

1.Over population

2.Traffic

3.Housing taking up land.

1.Open Spaces

2.Consideration for Wildlife

3.Cemeteries
To remain as Rural as possible and Unique as possible. 92595 60-69 White 193

1.Hometown feeling

2.Good people

3. Marna O'Brien Park

1. Speeders on Grand Ave

2. 3.

1.Reduce speed limit on
Grand Ave

2. Gates at Marna O'Brien
Park open at sunrise, the
opening time

3. With water shortage, why so much new housing to use more water? 92595 60-69 White 3557
APPENDIX A: Let's Envision Wildomar Survey Responses 23 What do you like about
Wildomar?
What challenges face the
City of Wildomar?
What would you like to
see more of? What’s your vision for Wildomar? Where do
you live?
What is
your age?
How would you identify your
race/ethnicity?
194

1. 2.

3. 1.keep up with traffic and
keep traffic from building
up

2. Crime rates

3. Homeless

1. Community service

2.community club house

3. Public
To have more community things. Like a ymca. Where people can go swimming and enjoy work outs and have community clubs for children and more family friendly parks 92595 40-49 195

1.Close to our family

2.Close to shopping

3.View from our house

1.Roads need improvement

2.Traffic enforcement

3.Properties not maintained

1.Downtown for community

2.More retail

3.Code enforcement
I would like to see the town being more cared for and places to go to in Wildomar. Keep the retail dollars in Wildomar rather than having them go to other cities. I would like people to keep their yards maintained and take pride in ownership. I would like the City and City Council to be more proactive in attracting business and development. Also, Code Enforcement should be out citing what the council puts in place for our community to put forth a positive presence for our community.
92595 60-69 White
196

1.small community

2.family oriented

3.close to everything

1.Tres Lagos Project

2.bringing in mental health
people into our community

3.water supply

1.parks

2.transportation

3.street cleaning
From what I see with the approval of Tres Lagos that our community will only go downhill. 92595 70+ Hispanic_or_Latino 197

1.not too crowded

2.lower cost of living

3.convenient access to
freeway

1.no community center

2.lack of police presence

3.apathy of its residents

1.police patrols

2.walking trails

3.community involvement
Wildomar will continue to be a bedroom community if we do not have our own community center. There needs to be more low income housing, even though it would be unpopular. 92595 other 198

1. NOT congested

2. Streets are maintained

3. Added horse lanes along
major road

1. Ukept trashy residences

2. Palm trees need pruning

3. Undeveloped vacant land

1. Sidewalks

2. Stores & Markets

3. Restaurants
To look like Murrieta.
199

1. Affordability

2. Equestrian / chickens
and small farm animals

3. Small town

1. Roads and drainage

2. Trashy yards and homes
in certain areas

3. No clothing
stores/shopping

1. Parks with pools or
water parks

2. Nice department stores

3. Community center for all
ages
No gangs, or homeless communities
Large park with community center
Neighborhoods cleaned up/beautified
92595 60-69 White
200

1.Country style of living

2.convenience of grocery
stores

3.country roads

1.over crowding

2.medical facilities

3.police force

1.sprouts grocery store

2.senior center

3.sizzler
More parks
Walking trails for seniors
Fix Clinton Keith’s street
2595 70+ White,Two_or_More_of_the_abov
e_Races/
201

1. Quiet

2. Small town feel

3. Friendly

1. Keeping crime low

2. Outgrowing the smalltown feel

3. 1. Sidewalks

2. Micro Breweries

3. Mom & Pop type
restaurants
Leave it as is!
Seriously though, don’t fill all the open spaces with buildings, parking lots or low-income housing. Moved here in 2018 and have loved the small town feel of Wildomar. I hate seeing the developments taking up the open spaces (yeah, talking about the Wildomar Trail project).
92595 40-49 White
202

1.small town feel

2.rural area

3.friendly people

1.roads need repairs

2.street lights, need more of

3.police patroling more.

1.police patrol

2.street sweeping

3.roads fixed
To continue to have the small town, rural feel. I enjoy seeing farm animals in the area, keep the life style in Wildomar simple. 92595 50-59 Hispanic_or_Latino
203

1. Quiet

2. Friendly people

3. Close to Murrietta &
Temecula, but more
affordable housing

1. Old, run down
neighborhoods

2. Not enough shopping
centers

3. Weaker school systems

1. Newer buildings,
shopping centers etc

2. New housing projects

3. Better school options
New, safe and expanding city with lots of opportunities for professional local work (a lot of us commute), better schools, more green areas-parks for children. A town center- main street like Old Town Temecula would be a plus. A larger grocery store or a shopping center chain would be greatly appreciated (Costco, Walmart, Target). 92595 30-39 White
204

1. rural

2. small

3.close to freeeways

1.bundy canyon pot holes

2.code enforcement

3.weed abatement/fire
hazards

1.work on bundy canyon

2.more police activity

3. to become more self sustaining and more new areas 92595 50-59 White 3558
APPENDIX A: Let's Envision Wildomar Survey Responses 24 What do you like about
Wildomar?
What challenges face the
City of Wildomar?
What would you like to
see more of? What’s your vision for Wildomar? Where do
you live?
What is
your age?
How would you identify your
race/ethnicity?
205

1.rural

2.no traffic

3.no street lights

1.police response time

2.streets falling apart

3.lack of bike lanes

1.police

2.more neighborhood
watch

3.more bike lanes
Moved to wildomar in 1995 when we still had hitching posts at one of the only markets in town. I loved the how rural it was. I know that growth has to happen but what we need is growth that will actually bring in money to the city. High rise dr offices will not bring in money for the city.
92595 50-59 White
206

1. FAMILY

2. WOKE FREE

3. COMMUNITY

1. FAR LEFT DEMS

2. BIG BOX STORES

3. TOO FEW JOBS

1. MOM AND POP BIZ

2. PARKS FOR FAMILIES

3. MORE INFRASTUCTURE
GENTLEMAN STYLE RANCHES 1 OR 2 ACRES MAX. KEEP FAMILY AS THE KEY TO THE FUTURE HERE. PROMOTE RESPECT IN

THE COMMUNITY WITH ONE ANOTHER
70+ Two_or_More_of_the_above_Rac
es/
207

1.proximity

2.up and coming

3. 1.infrastructure

2. Economic development

3. 1. Community

2. Retail and grocery stores
near bundy canyon

3. Self sustainable / economic development (residents not having to travel to nearby cities for goods), more community development / opportunities for youth 92595 30-39 Hispanic_or_Latino 208

1.mountains

2.rural feel

3.open spaces

1.traffic that comes with
growth

2.maintaining rural feel

3.not becoming Orange
County

1.walking paths

2.bike lanes

3.good restaurants
Rural, open feel …that all are welcome here, with open spaces and walking/bike/horse paths. 92595 70+ White 209

1.The small town feel

2.The rural feel

3.The closeness to anything
I might need

1.Taking forever to get
anything done.

2.Lack of citizen
involvement

3.Open City Council - NO

DISTRICTS

1.A few more larger
businesses for shopping

2.More speeding tickets -
ex: Bundy Canyon

3.A community center
All the things I mentioned above 92595 60-69 White
210

1.Open space

2.calm/friendly due to low
density

3.family oriented

1.overbuilding too quickly

2.Increased Demands for
water and electric

3.road
congestion/increasing
density

1.parks /open space

2.local city events -farmers
market

3.take care of Wildomar
interest first
Like it just the way it is. Slow down rapid building. We should have a 20+ year plan in place. Hopefully this is the case.

We should preserve Wildomar while growing to accommodate our children’s local housing needs and our aging.

However, we should not feel like we have to become a housing “build, build, build; there’s a national housing crises” sanctuary for the nation’s shortages.
92595 40-49 American_Indian_and_Alaska_Nat
i
211

1. Easy access to fwy.

2. Close to schools and
Dairy

3. For the most part, it's
quiet

1.Tore up roads.

2.Lack of sidewalks for kids
walking to school

3.Tag all over

4.Bundy/Sellars issue.

1. More stores and
restaurants

2. Nice landscape on the on
and off ramps of freeways.

3. Bike paths
Well kept safe city. With clean and nicely paved roads. Sidewalks for our kids to get all over. Parks and bike paths 92595 50-59 White 212

1.open spaces

2. 3.

1.loss of rural areas

2.too many homes

3.keeping up infrastructure
maintenance and repair

1. keep rural and horse
properties from being
eaten up by development

2.new city council.

3. Stick to the wildomar roots 60-69 White
213

1. Population

2. Scenery

3.taxes

1. Road work

2. Rural areas

3. Landscaping

1. Upkeep

2. Stores

3. Community gatherings
Small town feel with modern style shops, like Victoria gardens, time for some upgrades 92595 40-49 White 214

1. Population

2. Scenery

3.taxes

1. Road work

2. Rural areas

3. Landscaping

1. Upkeep

2. Stores

3. Community gatherings Small town feel with modern style shops, like Victoria gardens, time for some upgrades 92595 40-49 White 215

1.rural

2.peaceful

3.open

1.crime

2.dumping

3.infrastructures

1.infrastructures

2.public amenities

3.common sense To remain rural with limited growth as the infrastructure improves. 92595 50-59 White 3559
APPENDIX A: Let's Envision Wildomar Survey Responses 25 What do you like about
Wildomar?
What challenges face the
City of Wildomar?
What would you like to
see more of? What’s your vision for Wildomar? Where do
you live?
What is
your age?
How would you identify your
race/ethnicity?
216

1.small town feel

2.rural/horses, trails/open
spaces

3.council members/mayor
accessible at city events

1.run down/weedy
properties

2. Enticing businesses to
benefit OUR residents.

Restaurants, shopping.

3.roads

1.events for adults

2.workshops-gardening

3.unique restaurants,
shopping & experiences
For Clinton Keith to become a major traveled road containing larger stores like target and decent restaurants. Keep Wildomar Trail rural. Put all the big business and traffic on Clinton Keith. I’d love to see an equestrian center and more focus on horse trails and hiking. Make Wildomar Trail a “old town“ with the school bell, post office, cemetery, antiques, shops, restaurants. 92595 60-69 White
217

1. Accessible, open-minded
city staff.

2. Safe community

3. Business-friendly

1. Development costs

2. Few incentives for
people and businesses to
move here

3. Tax base, limited growth

1. Housing and
entertainment

2. Friendly business climate

3. Incentives to develop
difficult terrain
"Why should my business/family move to Wildomar vs Murrieta/Menifee/Elsinore?" Only 3% growth since 2010, is that correct? Don't create another Canyon Lake-style pretentious attitude at the city. There is no doubt we are in an economic slowdown, our communities are competing for fewer development dollars. Incentivize infrastructure development to attract more investment; developers can build affordable housing and entertainment to attract people.

We need more restaurants! Create an active lifestyle mix of rural and urban, family and adult entertainment (not THAT kind of adult entertainment) connected by efficient roads. Keep the pot shops/smoke shops OUT! There has been blighted housing and neighborhoods for too long. Underground the power lines (fire safety and gets rid of that blighted feel). We're headed in the right direction - we just need to be more aggressive to stave off competition from nearby cities. 50-59
218

1.low taxes
2 small town vibe

3. Hidden gem

1.small infrastructure

2. Homelessness

3. Crime/drugs(see #1)

1.road repair not horse
trails

2. Code enforcement,
places are looking sloppy.

Residential and commercial I imagine wildomar will be an apartment or storage facility haven. Maybe a park East of the 15? How long has Wildomar been a city? 2008? 92595 40-49
Two_or_More_of_the_above_Rac
es/
219 1.More of a country feel

2.Nice neighbors

3.quiet

1. 2.

3. 1.grocery store, shops,
bundy canyon area

2. 3. Be similar to Norco, country feel but with all the amenities 92595 40-49 White 220
1 Liked it when the original
general plan was being
followed.

2. 3.

1. General Plan: Inability to
follow

3. Staff attitude.

Following the original
general plan Unfortunately
it's too late for these
suggestions. It's too late, the vision no longer exists. 60-69 other 221

1. Rural character of the
area

2. Easy access to 15
Freeway

3. Hometown feel

1. Lack of Infrastructure.

2. Minimal funding

3. Minimal revenue stream

1. Fire station, Senior Ctr,
Amphitheatre, Sheriff
station..

2. Equestrian trails

3. Cleaner properties
Continue Wildomar's vision to be a safe and active community with reasonable growth and quality infrastructure while keeping a hometown feel. Eliminate placements of Mobile Homes and require permanent structures only with off-site improvement requirements. Establish Infrastructure Districts for new developments to ensure proper roads, parks, fire station(s) are in place. Focus on improving older established areas, via road improvements and existing property cleanup improvements. Ensure trail system is in place for all new developments and continue to support the equestrian community. Ensure all new developments provide on site park and trail amenities.

Maintain rural feel throughout the city where possible. Implement citywide funding program that all residents are required to fund via property taxes for new Fire station, Sheriff/Police station, citywide street sweeping, landscaping, and road maintenance. Clean up properties throughout the city (eliminate blight). 92595 50-59 White 222 1.Peace

2.Quiet

3.Unique

1.Slow Development

2.Restaurants & shops are
not conveniently located

3. Bundy Canyon/Scott
dangerous road

1.Clinton Keith style
shopping center on Bundy
canyon

2. Trails to walk

3. Jobs such as
manufacturing
Have all services and conveniences that our neighboring cities have. More jobs, schools, shops. There needs to be a "downtown area" where the community can hang out. 92595 30-39 Hispanic_or_Latino 3560
Wildomar’s General Plan Update – Community Survey Summary #2| 1

Envision Wildomar 2040
Community Survey #2

OVERVIEW
The second online community survey for Wildomar’s General Plan Update was available for 5 weeks between November 30th, 2022 and January 4th 2023. A total of 239 survey responses were received. The survey was available in English and Spanish and promoted on the Envision Wildomar 2040 project website, through the City’s weekly email listserv, and City Facebook page.

This survey contained two sections. The first section solicited input on the draft Guiding Principles, which will provide the framework for the City’s General Plan Update. Participants were asked whether they agree or disagree on each of the six draft Guiding Principles. At least 73% of survey respondents agreed with each Guiding Principle.

The second section of the survey solicited input on what land uses should be encouraged in nine focus areas in the City.

Information gathered from the second section will be used to develop the Land Use Plan for the City. This section included a summary of how focus areas were identified, followed by a key map, current General Plan Land Use map, existing land use map, and key considerations for each focus area. Land use concepts were presented for participants to choose from.

An “other” option was also provided for participants to write in their own preferred land use for the focus areas. A summary of survey results is presented below. Complete survey responses are included in an appendix to this summary. 239 Total Survey Responses
237 English + 2 Spanish
Section 1: Guiding Principles: Over the next 20 years, Wildomar will be a city that… (number of votes)

1. Community Character: Provides a welcoming, safe and family-friendly environment with opportunities for healthy, self-sustaining (or self-sufficient) lifestyles for all residents. a. Agree (193) 80.75%
b. Disagree (46) 19.25%

2. Growth & Development: Balances responsible growth with preservation of rural character, open spaces and historical resources.
a. Agree (183) 76.57%
b. Disagree (56) 23.43%

3. Infrastructure & Services: Provides for social, physical and mental health through arts and programs, entertainment, recreational opportunities, quality infrastructure and gathering places for residents of all ages and abilities.
a. Agree (175) 73.22%
b. Disagree (64) 26.78%
3561
Wildomar’s General Plan Update – Community Survey Summary #2| 2

4. Economic Health: Nurtures small businesses, attracts high-quality jobs, provides quality educational opportunities and commercial services that capture local spending and generate revenues to support Wildomar’s vision for the future.
a. Agree (180) 75.31%
b. Disagree (59) 24.69%

5. Environment: Protects the visual and ecological value of its natural resources. a. Agree (187) 78.24%
b. Disagree (52) 21.76%

6. Mobility: Maintains safe roadways and high-quality pedestrian, bicycle, multi-purpose trail and transit networks. a. Agree (181) 75.73%
b. Disagree (58) 24.27%
Section 2: Focus Areas
3562
Wildomar’s General Plan Update
– Community Survey Summary #2| 3
3563
Wildomar’s General Plan Update
– Community Survey Summary #2| 4
3564
Wildomar’s General Plan Update
– Community Survey Summary #2| 5
3565
Wildomar’s General Plan Update
– Community Survey Summary #2| 6
3566
Guiding Principle 1: Additional Comments
This question bothers me because how could you ever disagree.

Not using its current path.
self-sufficient will never be possible. This city will always need grants to provide what other cities consider basic Sounds awesome! Reality check: Wildomar will never have the revenue to achieve this BS! CC reckless 3-2 vote allowing marijuana without LEA prepared presentation on impacts I would like Clarification on what self-sustaining actually looks like No jobs for self sustaining your family.

Needs more jobs here. Not everyone works in fast food. Need some more development on the industrial side Stop building and bringing in the Riff Raff
This city has very little community involvement.as many residents have to leave the area to work.

I dont think any city will be safe with the amount of crime Too vague. Could imply that we need high density areas to increase revenue. Doesn't speak to the need to keep larger properties from being divided up. Nothing about rural or country feel? not the way we are going
That lie has been since I moved here in 89
We are far from this at the moment.

I think Wildomar shouldn’t be a city at all. Wildomar should be absorbed by Murrieta and Lake Elsinore.

With low income, rehabilitation housing in the works, also the increasing number of apartment complexes being built I believe this will bring tge wrong element to our community. projects Revenue sources, business opportunities
Too many projects!!! No one is addressing the wildlife. We are watching coyotes in Wildomar and surrounding city's walking and jumping in neighborhood tracks.

As of now, people of color are still being harassed. It happens especially to my black friends and their children, as white children call them the n word while they’re in their own yard.

PLEASE KEEP IT AS FAMILY FRIENDLY-RURAL AS POSSIBLE
While hopeful that this would be true, the continuing sprawl over just the past two years is discouraging.

With the proposed Meadows development, it will completely urbanize Wildomar, harm wildlife and continue to further urban sprawl. It will also severely harm existing communities such as The Farm.

As long as we continue to be rural and don’t forget our start Define family-friendly.

Not just residents, businesses, customers, tourists, visitors to businesses, revenue sources, etc Keep Wildomar Rural
Please do not over build with too many homes!!
Too many housing projects in the works….

I hope so
Not if you keep packing in tract homes elbow to elbow!
They are building low income and mentally ill housing at the end of my street. This will not be safe.

Not with the low income housing with mentally unstable occupants. This doesn’t make me or my family safe.

If we engage in family/ business friendly planning
To have this vision- the actions must reflect. You need to direct money into parks and safe family friendly businesses. The recent additions of marijuana dispensaries and low income mental health housing is not going With the current buildings and the potential construction of the low income housing I expect our crime rate to Plan to incorporate too many high or medium density properties.

Though our community offerings are on the meager side of things, I can see the genuine efforts to build a friendly community open to all.
3567
65 year resident
Unless that involves the continuation of the never ending party to hat has n ok we taken up residence at the edge of the border with lake Elsinore
Legalizing the sale of marijuana is not "safe," "healthy," or "family friendly." Wildomar is much too caught up in holding on to the past... The city has stagnated and fallen far behind neighboring cities, and will continue to do so under the current vision and leadership.

Just our streets, street lighting, sidewalks, public easements/ ride aways, storm drainage systems, wastewater infrastructure, water and power demands are going to take 20 years to get to a safe, sufficient and healthy functional manner.

Literally nothing to do here for adults. Tennis courts? Adult rec leagues? Bowling Alley? Ice Rink? Movie theatre? Something besides restaurants, coffee shops and bars please.

Elaboration on "opportunities" in case that means more unneeded/unwanted fastfood, gas station, car washes, megaplazas, dispensaries and the like...
minimal growth please - we need to keep space for nature! and business
Your not protecting the Ranch Communties
As long as there are no apartments and no high density apartments in the city of Wildomar.

In 20 yrs I will be 95 yrs old and I don't think my grandkids will move here from OC.

Guiding Principle 2: Additional Comments
Emphasis on preservation of rural character
Wildomar had strayed from the once loved rural character years ago.

This city has no clue as to what their historical resources are, open space without access does the public no Wildomar's foreseeable municipal economic poverty, should support this "Guiding Priciple".

GP to preserve character, open spaces, and encourage property usage to maintain history stop the high density housing
You keep allowing track homes. At least the homes should be on bigger lots for animals We have already hit our growth limit if we are maintaining balance and a rural focus.

The rural character is nice but don’t let that be the reason why we don’t grow. emphasis on rural with less growth
No mor people or building
Quite building. The rural character is almost gone.

We are already overbuilding & taking away the natural rural land And if any doubt, pick the rural and historical first and foremost just look at 15 fwy and Clinton Keith
Love the small town feel of Wildomar with the opportunity to shop local.

If we’re considered rural stop building something every second!!! You are already building too many track homes to justify that Responsible growth that respects the current residents and doesn't force high density housing and gas stations in their backyards.

Your idea of rural is ghetto with dirt roads. North side of town definitely proves that As much as I’d like this to be the case, I don’t see this happening.

Love the Rural - stop crowded housing tracts under 1/2 acre I've seen no improvement in our roads infrastructure, and no new park for recreation since moving here.

The city is growing and building too fast without considering our current road conditions and already 3568
Like the rural look
The rural character and open spaces seem to be under increasing “attack.” Too many houses and high use (apartment/condos) being built off Bundy Canyon, very near the Farm I sure hope so....that is why most of us moved here in the first place. STOP the tract housing.

Yes please! We need to preserve our rapidly disappearing open spaces.

The proposed development behind the farm community is highly irresponsible and dangerous to wildlife, ecology, and resources for the communities.

Not if we continue to cater to developers and big money We have to special take care to preserve the natural areas.

Build, build, build is not what Wildomar is about. Make sure we can supply adequate water to any new I agree with this statement IF the city limits the amount of new housing to be built. I moved to Wildomar specifically for the rural setting and am now finding out that the city keeps expanding how many homes they'd We don’t need big box stores and theaters…
Please Please Please
Would also like to see resources for native plants requirements for developers.

There will be no open land left , car wash on every other corner I hope so! I'd hate to see Wildomar fall into the hands of greedy developers that ruin it's charm.

We need lower density development alternatives, like a 4 Seasons style senior citizen golf We'll see.

Not with the building
This will hv to be a priority
So far everything seems to be developing the rural right out Everyone undeveloped piece of land being turned into housing or repetitive business like gas stations & fast food Because of the Plan to incorporate too many high or medium density properties That's not the most important thing, but I see it happening.

We are definitely out of balance with the need of responsible industry growth These are things we like about Wildomar.

The city will continue to chose money from developers and tax revenue over preserving open space, cultural and historic resources. The city won't stand up to developers and thier hired consultants that help them work around environmental constraints.

As I commented in the last question, Wildomar has no progressive vision and has and will continue to fall far behind neighboring cities. There needs to be a much more aggressive stance with creating Park and Open spaces for community gathering and events.

It is inevitable that we need to no longer be rural, but add new business and building opportunities Enough coffee, pot, car washes and gas stations.

YES! less growth more open spaces
Too many new homes being built.

Current excessive building has nothing to do with the rural roots of our community. Should have saved The I live in the farm community off Bundy canyon. I don’t think the Wildomar meadow proposed plan should not be approve. Traffic on Bundy is busy as it is.

Houses should be built with land. Not side by side track homes. That will keep the rural feel Guiding Principle 3: Additional Comments
as long as its not malls, preferably no movie theaters. A good rec center, more parks YESS!!!!
The city and its staff has a lot of growth needed to achieve this. 3569
This city will never catch up on road repairs. Programs? We passed a tax for that 10 years ago and have no programs, only events.

I like the sentiment, but come on, this ABSOLUTE "BS" Guiding Principle will NEVER happen in the perpetual pauper city of Wildomar!
GP reflect services by private entities with less onerous fees & focus on infrastructure maint doubt this will happen considering all the overbuilding I don’t know if too many programs and you have plans for parks but nothing in my neighborhood Need examples... principle is too vague.

Yes please, redo the marna O’Brien park too. So much wasted space there could be much more there It hasn’t happened in the past so there’s little reason to believe it will change soon No more people or building
Will need a large tax base to accommodate all of these improvements.

This statement just contradicted the previous for keeping wildomar rural putting apartments in the middle of single family homes I'd love to see more Art and Entertainment opportunities for the local community to enjoy.

Stop build shit until the infrastructure can handle the demand!!! Remains to be seen . Hospital does not count
I agree but don’t see this actually happening.

We don't need another Temecula. We need business to support the city Our current city council does not follow these values. We need a better representation of our community.

I beleave we are behind our naughbering communities in this area add Businesses & customers
Wildomar does have exceptional programs.

Plenty of that local. Keep us rural
Already plenty of businesses don’t overcrowd this place! We came from Beaumont which use to be like Wildomar and now it’s busting out at the seams and is gridlock to drive anywhere! On the fence, but lean towards disagree, again because of the ever-increasing sprawl. Watching the work on Bundy Canyon and Wildomar Trail in real time, infrastructure seems to be an afterthought.

Haven’t seen anything yet!
With a complete lack of control of the homeless and drug addicts currently, and resources being spent recklessly on non-relevant issues, I fear for the well-being of current residence add visitors, customers, entrpreneurs, service providers, job opportunities in city Would be nice to have a Senior Citizens facility where one can enjoy billiards, games, luncheons, dinners & Parks and outdoor entertainment like trails
Yes, we want to look like this
Too many retail stores , not much for family entertainment In moderation I hope.

Let’s hope not,, we like things the way they are, kinda funky and small town feel.

I hope so
need tennis courts
The land in back of The Farm is a once in a lifetime opportunity to create a 55+ Golf Community for active seniors. This is so much better than high density tract homes and creates much less stress on the infrastructure.

I have no idea but it would be nice.

Not with the apartments being built for the mentally unstable and no one to help them or resources for them We are definitely lacking in these areas
Haven’t seen anything done by the city so far that indicates that. Most of the focus seems on residential & commercial development
3570
Some large parks!
Have no information on the plan to enhance the community with art programs, entertainment, recreation, etc Wildomar may not end up being head of the class in this regard, but I can see the desire.

But where can it be accessed?
We're getting a bit to top heavy on the parks
The city shouldn't be involved in social, physical and mental health issues.

There has been little to none of that so far and under the current vision and leadership I can't see any of that developing in the future.

I do not see this type of development occurring with Temecula so close with their opportunities in these areas.

Will it? Hope so! That was in my previous comment. Literally next to nothing here now that fits those needs. would love to see more arts (like fall brook temecula etc) for adults - not just kids please this is important
Hope we get a community center before 20 yrs
We need sports in Wildomar for the children and some kind of community center!! Guiding Principle 4: Additional Comments
Agreed but there are too many weed shops popping up. We need parks, not we’d shops.

Wildomar needs to work on its turnaround times for plan checking if it plans to grow. Most developers are discouraged by time-frames.

City only supports small businesses that provide minimum wage jobs. Major source of revenue will continue to be online shopping
Selling "Arts and Crafts", most of which will be "off the books", will not revenues to support Wildomar's Consider zoning uses. Cut costs for businesses and individuals to build/operate here seems as if the city if for sale to the highest bidder
No t enough high paying jobs
Yes but the council will have to get past their own biases somewhat agree.. less commercial services and more educational opportunities No more people or building.. go back to a town
There cannot be high quality jobs without ALOT more new businesses, currently there are no jobs in Wildomar All while keeping true to the values of a rural community most jobs working in fast food
Small businesses are the backbone of the city and should be encouraged.

Stop build shit until the infrastructure can handle the demand!!! All the money goes to one park in south west wildomar not the entire city. Not a fair division of funds from We need to do better.

Wildomar makes it too hard on businesses to open within our city. Again. We need a new city council Bring back farm & agricultural life
Without a strong working class community, I beleave their will not be enough support for small businesses Has been sometimes difficult to get small business licenses and some are leaving to incorporate in other towns Keep Wildomar small bedroom community
I’d like to know more about what that looks in practice that might be different from what we are doing now.

And for that reason, I will select “disagree” for now
Sounds good, again, but not overly optimistic based on the growth that seems destined to ovewhelm what the town is capable of accomodating.

Too many car washes being built. Need better companies coming in for better paying jobs. 3571
Keep on with the "small" businesses and the small town feel.

With the incredibly difficult process for rezoning for anyone but giant developers, it makes it very difficult for small businesses to exist in Wildomar
Keep Wildomar rural looking with open spaces
Without gouging taxpayers!!
When will Mt. San Jacinto College get under construction? Our kids need a place to continue their education! No more car washes, liquor stores etc
Haven’t seen any evidence of this in the recent developments made by the city, unless you count the marijuana stores as nurturing small business
Very limited number of small businesses. Maybe some medical job opportunities with Inland Valley expansion and new Kaiser office.

Sure, Wildomar is open to it, now it depends on the people with money to want to bring it here.

There are not enough businesses here. People need local quality jobs not fast food.

Not with the way you maintain our roads
We like the small businesses in Wildomar: Los Mocajetes and Wildomar Parlour and Montagues Coffee.

I'm certain the city will do everything it can to generate revenue to continue fueling the corrupt public employee union machine.

This is crucial for our city’s growth
Doubtful. MSJC bailed. We attract gas stations, car washes and pot shops currently.

See resident's previous comment, especially with regard to "commercial services that 'capture' locale spending." Sounds like a hostage situation.

With responsible growth, with preservation of rural character, open spaces, and historical resources. as long as that doesn't impact the traffic and adversely impact nature and environment Rural areas and high quality jobs don’t go together.

Our schools are over crowded so please don’t consider building apartments.

Please No Wearhouses in Wildomar
Do not agree with bringing in big compapand take away the family hometown feel Guiding Principle 5: Additional Comments
We are not doing a good job at this today!

STOP OVER POPULATING WITHOUT INFRASTRUCTURE
The city needs to quit changing the specific plan to accommodate development that just wants to get rich and This needs to be a main focus
Ecological values are being destroyed with every construction project that places drainage system underground in concrete pipes. Murrieta Creek is currently more that 50% concrete No money, no change, may contribute to this "Guiding Principle", which by the way is 180 degrees opposed to many of the other "Guiding Principles"
agricultural use friendly in all zones - history includes strong agri. and self-sufficiency they are not being protected now, this needs to change !!!! Nothing rural in wildomar anymore.

No more flattening fields and removing landscaping to build needless tract homes on every block.

You city people don’t care about our history
Seems like we are already gobbing up open spaces very quickly.

Priority
do not see that now
3572
Love all the parks and open spaces. What about adding a YMCA or Volleyball/Tennis/Pickleball courts for the Stop build shit until the infrastructure can handle the demand!!! You’re already tearing up open land and making track houses Visual? There isn’t even a freeway sign welcoming people AND that signage needs to be at Bundy as well! We really don't have that much open space.

Love the view to the west
Not sure if this is the place for this but I don’t think the wildoMar meadows project is in line with wildomar’s values and visions . It has no place here in my opinion.

This seems at odds presently, let alone in 20 years.

Would hope so.

Again, too many houses being built in our rural areas.

I am already seeing that being destroyed and its so sad.

Stop the Wildomar Meadows project
This is a very important item, because once nature is gone, it's gone.

Keep open spaces open
Yes please
Please do not over develop!!
It doesn’t look like that is the direction things are headed.

That statement needs more information. Way to general
Lower density residential should be a priority, especially in prime view areas in the hills.

I sure hope so.

Promote our trails for family, picnic use
The city no, but it’s citizens do seems to be making an effort to keep it clean with volunteer programs Example… commercial lighting from strip malls has negative impact to nearby residential communities.

I sure hope so, though I can't really name very much of that off the top of my head.

Quit changing road names, or go back to where you came from, history counts Find the balance. Too many dirt roads and horrible flood control (none!) where the water runoff keeps eroding our properties. Our taxes should maintain our roads also and not just those roads already paved.

We like the walking trails.

The city will approve any development if the price it right. Developing land and setting aside pocket parks and the least desirable portion of property as "nature" or "open space" is NOT protecting natural resources!!!! I have seen none of this thus far since we became a city. We hold on to a fictitious hometown feel which actually translates to no vision and no action.

We concede to builder demands or ignore resident….ie Tres Lagos. Where was the planning commission on approving this design? Shameful.
sounds kinda like we can 'see' it but not 'touch'. disagree - people need to get OUT IN nature! The Wildomar meadows will destroy natural habitat.

Protect our hills. Keep them natural for wildlife.

Guiding Principle 6: Additional Comments
Can we maintain what we have now?
Would rather see more horse trails then bike trails
Including county roads within city limits.

STOP OVER POPULATING
The current roads are so bumpy and need repair. Also our street signage needs cleanup/replacement.

Our roads suck what happen to those tax dollars. Patch jobs don't fix the roads. 3573
Current multi-use trail has no regularly scheduled maintenance. Future trails will be the same. Pedestrian walkways lead to nowhere
Nice Guiding Principle! You would have to be as delusional as our founding mother & fathers to believe this Continue to develop multi-use trails and maintain the roads also not happening now
The roads weren’t made for all the traffic now. My dirt road is better than some of roads in Wildomar Don't know really about next 20 years but Wildomar has a bad track record so far where roads are concerned, i.e. Bundy Canyon taking more than 12 years to implement any improvement other then occasional patchwork.

You don’t do that now with the tax money !! Why would you later it’s just more money in your pocket Again, will need large tax base.

Our Wildomar streets are in disrepair, in fact my cul de sac has had a major crack. There has been so service for us in more than 15 years. The crack is getting worse all the time. most main roads are single lane with pot holes
Stop build shit until the infrastructure can handle the demand!!! You are way behind the curve are roads are the worst in the county aside from the 60 freeway Seeing is believing! Trash is everywhere
The city doesn’t do this now.

Hahahaa this is a joke right? Wildomar is the worst at maintaining safe roadways This is a need now. Roads are so bad
Except bike paths.

I've only seen a decline in our road and infrastructure since moving here in 2010.

BUNDY CANTON RD...need I say more????
I drove from Wildomar to Utah while pulling a trailer. By far the scariest city to drive through road wise, was Love walking our dog on the horse trails Palomar and Grand. Need some doggie poop stations with bags It would be great to be able to have sidewalks or a horse trail/ golf cart trail down bundy/Scott to be able to access the rest of the city
Please fix the mess on bundy canyon before some gets killed! I’m referring to the current construction conditions which are unacceptable!
Again, the current state of the above is questionable, and the rapid growth seems bound to trample safety and Ya right
Safe roadways? Let's talk about Bundy Canyon, this is a death trap, so many fatality accident from bad roads, construction zones not properly marked or opened up with improper road signage.

With the absolutely atrocious handling of the Bundy canyon widening project, I fear for any future projects Implements circulation plan's new connections & roads
Don’t need more housing. Surface streets are too congested We can use a little repaired of our white vinyl ranch style fencing. Some kid must be vandalizing. Like tagging on walls we should probably immediately fix.

The city, if not already doing so, needs to pursue all available Federal Grants and other sources of income to pave the dirt roads. income
With the onset of electric bicycles and other vehicles; prioritizing a safe space for these riders will be important! Also possiblity of a regional park or amphitheater for venues.

Has a lot to catch up
This is just a hope…
Need more sidewalks than bike lanes
We need a bikeway in honor of Pieter vandeBovenkamp
While being financially responsible.

Not sure if this is in our plans. I hope so.
3574
The roads we have aren’t maintained or are not fixed properly.

This will depend on state funding
We are way behind on this, our roads are a nightmare and not safe.

This is essential and lacking in Wildomar
Worst roads in riverside county. I have cracked two wheels on our crappy roads. Infrastructure is important.

Clinton Keith and many roads need a major overhaul. Our street has been severely cracked for over eight years.

Our roads are supposed to be slurries every ten years not twenty. We are at 18 years and slurry and no plans to Residential streets are currently not regularly maintained. Is there a plan to change that? Clinton keith needs to be wider and a higher speed limit Again, if Wildomar can attain a C grade for such things, that will be remarkable considering the small budget that Wildomar has to work with.

Doesn't. Living on a dirt road for 34+ years. Pay higher taxes than a lot of others.

I'll believe it when I see it
100 focus on safety on these roads needs to be a priority. All of the roads even the old ones.

I'm sure it will but the city should not be investing in things that create neverending maintenance and expense The city of Wildomar has continuously failed to maintain safe roadways. I don't see any change in the future.

That’s hysterical!
They haven't improve any of the road conditions now. Will it change dout it bicycles can be a huge problem - i've lived in places where bicyclists thought they owned the entire roadways We don’t have sidewalks on the farm community making it unsafe for our kids .

Please do not remove equestrian trails
Yes Yes hope for safe trails in my 90's
3575
Focus Area 1
Responses Other (Write in Concept) Additional Comments
Concept B: Lower
Density Reside
Concept C: Mixed-Use
Concept B: Lower
Density Reside
Concept C: Mixed-Use Mixed use along Mission Trail.

Concept B: Lower
Density Reside
I do not agree with the fact they are
building apartments homes across my
street. There will be more traffic in my are
and street parking will be taken.

Concept B: Lower
Density Reside
Concept B: Lower
Density Reside
Concept A: Higher
Density Resid
Concept C: Mixed-Use
I like the thought of this, something like
main st in Elsinore would be nice
Concept C: Mixed-Use
Concept C: Mixed-Use
Concept B: Lower
Density Reside
Concept B: Lower
Density Reside
Concept C: Mixed-Use Area 4 and 5 should be 1 and 2.

Concept B: Lower
Density Reside
Concept C: Mixed-Use
other NO OVER POPULATION

STOP CONSTANTLY BUILDING HOUSES AND

STRIP MALLS WITHOUT INFRASTRUCTURE
Concept B: Lower
Density Reside
other No change
Concept C: Mixed-Use
Concept C: Mixed-Use
Concept B: Lower
Density Reside
Concept C: Mixed-Use
Concept C: Mixed-Use
3576
Concept B: Lower
Density Reside
Wildomar has encouraged way to many
multi family homes recently. This
predominantly brings crime in the years to
come.

Concept C: Mixed-Use
Concept C: Mixed-Use
Concept C: Mixed-Use
Concept C: Mixed-Use
Concept B: Lower
Density Reside
Concept C: Mixed-Use
Commercial and highest density along
Mission Trail, leave the rest alone.

Concept B: Lower
Density Reside
No low income or affordable housing it
brings trash and crime to the neighborhood
Concept B: Lower
Density Reside
Concept C: Mixed-Use
other
Mixed use on major arteries and
lower density residential on other
streets.
formal report presentation from sheriff's
dept re: HDR & safety / family impacts in
this area
other
Concept B: Lower
Density Reside
Concept C: Mixed-Use
Concept C: Mixed-Use
Concept C: Mixed-Use
Concept C: Mixed-Use
other
stop with all the damn construction,
high density housing, tracts with no
infrastructure etc
Concept C: Mixed-Use
Concept B: Lower
Density Reside
There shouldn’t ever be high density. What
about a big industrial park so good jobs
could be here
other Need more info
Concept A: Higher
Density Resid
Concept B: Lower
Density Reside
Concept B: Lower
Density Reside
Concept C: Mixed-Use
Concept A: Higher
Density Resid
Concept B: Lower
Density Reside
3577
Concept B: Lower
Density Reside
Concept A: Higher
Density Resid
other Leave the Land, Land
Concept C: Mixed-Use
Concept A: Higher
Density Resid
Concept B: Lower
Density Reside
Concept B: Lower
Density Reside
Concept C: Mixed-Use
Concept C: Mixed-Use
Concept C: Mixed-Use
Concept B: Lower
Density Reside
Concept B: Lower
Density Reside
Concept C: Mixed-Use
Concept B: Lower
Density Reside
Concept C: Mixed-Use
Concept B: Lower
Density Reside
Concept C: Mixed-Use
Concept B: Lower
Density Reside
Concept C: Mixed-Use
other
Stop build shit until the
infrastructure can handle the
demand!!!
Stop build shit until the infrastructure can
handle the demand!!!
Concept B: Lower
Density Reside
Concept B: Lower
Density Reside
Concept B: Lower
Density Reside
Concept C: Mixed-Use
Concept B: Lower
Density Reside
other
Concept C: Mixed-Use
Concept B: Lower
Density Reside No gentrification!
Concept C: Mixed-Use
Concept C: Mixed-Use
3578
Concept B: Lower
Density Reside
Concept C: Mixed-Use
Concept B: Lower
Density Reside
Concept B: Lower
Density Reside
Concept B: Lower
Density Reside
Concept B: Lower
Density Reside
Concept C: Mixed-Use
Concept C: Mixed-Use
Concept C: Mixed-Use
Concept C: Mixed-Use
Concept B: Lower
Density Reside
Concept B: Lower
Density Reside
Concept C: Mixed-Use
Concept B: Lower
Density Reside
Concept C: Mixed-Use
Concept C: Mixed-Use
Concept C: Mixed-Use
Concept C: Mixed-Use
Concept B: Lower
Density Reside
Concept A: Higher
Density Resid
Concept A: Higher
Density Resid
Keep low income apartments on this side of
Wildomar
Concept C: Mixed-Use
I would love to see the “commercial” side of
this have a much more small town, mom
and pop feel. Very much like downtown
lake Elsinore. Encourage local small
businesses
other
We don’t want our area over populated ,
due to the fact bundy is already a very busy
road, it’s only going to create more
problems, accidents and more deaths
Concept C: Mixed-Use
Concept B: Lower
Density Reside
Concept B: Lower
Density Reside
Concept C: Mixed-Use
3579
Concept B: Lower
Density Reside
Concept B: Lower
Density Reside
Concept B: Lower
Density Reside
Concept C: Mixed-Use
Concept C: Mixed-Use
Concept B: Lower
Density Reside
Concept B: Lower
Density Reside
Concept B: Lower
Density Reside
other
Rural residential and light
commercial, also residential
commercial.

High density housing will be the death of
Wildomar as we know it. I have lived in
highly dense urban settings, and I will refuse
to stay in that environment.

Concept B: Lower
Density Reside
Concept C: Mixed-Use
Concept C: Mixed-Use
Concept C: Mixed-Use
Concept C: Mixed-Use
Concept B: Lower
Density Reside
Keep our rural land and small town values
as they are. Progress doesn’t mean what
the word implies. Progress means changes
and we the people chose to live in
Wildomar for the small town feel, values,
and rural areas
other
It seems these options are going to
remove the trailer parks and end up
pricing out the current residents,
displacing them as we've seen
happen in so many other
communities. We must take care
not to let this happen to our
residents of Wildomar.

It seems these options are going to remove
the trailer parks and end up pricing out the
current residents, displacing them as we've
seen happen in so many other
communities. We must take care not to let
this happen to our residents of Wildomar.
other
It seems these options are going to
remove the trailer parks and end up
pricing out the current residents,
displacing them as we've seen
happen in so many other
communities. We must take care
not to let this happen to our
residents of Wildomar.

It seems these options are going to remove
the trailer parks and end up pricing out the
current residents, displacing them as we've
seen happen in so many other
communities. We must take care not to let
this happen to our residents of Wildomar.

Concept C: Mixed-Use
3580
Concept C: Mixed-Use
Concept C: Mixed-Use
Concept B: Lower
Density Reside
Concept C: Mixed-Use
other
Don’t need more residential type
buildings. Traffic congestion on
surface streets and freeways are at
their max. Poor engineering. Would
welcome small businesses vs
families with 5 vehicles
Concept C: Mixed-Use
Concept C: Mixed-Use
Concept B: Lower
Density Reside
Concept C: Mixed-Use
Concept A: Higher
Density Resid
Concept C: Mixed-Use
Concept A: Higher
Density Resid
Concept C: Mixed-Use
Concept B: Lower
Density Reside
Concept C: Mixed-Use
other
Concept C: Mixed-Use
Concept C: Mixed-Use
Concept B: Lower
Density Reside
NO OVER BUILDING OF HOMES!! WE DON'T
NEED THE CONGESTION!
Concept B: Lower
Density Reside
Concept C: Mixed-Use
Concept B: Lower
Density Reside
Concept A: Higher
Density Resid
It is important to allow strategic high
density developments that provide
affordable housing to Wildomar employees
and for senior citizens so they can
affordably retire in the city they live.

Concept C: Mixed-Use
Concept A: Higher
Density Resid
Concept B: Lower
Density Reside
3581
Concept B: Lower
Density Reside
Please do NOT ruin our city with a bunch of
cheap apartments. Nice condos maybe.

Concept C: Mixed-Use
Concept C: Mixed-Use
Concept B: Lower
Density Reside
I'd like it to remain as rural as possible with
a small town feel. Higher density housing
means higher population, higher crime,
busy streets, etc.

Concept C: Mixed-Use A mix of Concept A and Concept C
Concept B: Lower
Density Reside
There are currently way too many mobile
homes in Wildomar.

Concept B: Lower
Density Reside
Concept B: Lower
Density Reside
Concept B: Lower
Density Reside
Concept C: Mixed-Use
Concept C: Mixed-Use
Concept C: Mixed-Use
Concept C: Mixed-Use
Concept C: Mixed-Use
Concept B: Lower
Density Reside
Concept B: Lower
Density Reside
Concept B: Lower
Density Reside
Concept C: Mixed-Use
Concept B: Lower
Density Reside
Concept C: Mixed-Use
Concept B: Lower
Density Reside
Concept B: Lower
Density Reside
Concept C: Mixed-Use
Concept C: Mixed-Use
Definitely need to redo the mobile home
areas on land and change to a more
desirable housing concept with more
shopping
Concept B: Lower
Density Reside
Concept B: Lower
Density Reside
3582
Concept A: Higher
Density Resid
Concept C: Mixed-Use
Concept B: Lower
Density Reside
Concept A: Higher
Density Resid
Concept A: Higher
Density Resid
Concept C: Mixed-Use
Concept A: Higher
Density Resid
Concept A: Higher
Density Resid
Concept B: Lower
Density Reside
Concept A: Higher
Density Resid
other
Other than allowing individual owners to
upgrade as they see fit, this area should be
left alone at this point in time. To try too
much there, it's invariable that the gadflies
will cry "gentrification" as if that were
actually a bad thing.

Concept B: Lower
Density Reside
Concept C: Mixed-Use
other None of the above
Either way you seem way to eager to
displace a whole lot of homes. Many of
which are owned. Also, you're talking about
hills that have developed huge cracks after
construction has begun in the past
Concept C: Mixed-Use
Concept C: Mixed-Use
Concept A: Higher
Density Resid
Concept B: Lower
Density Reside
Concept C: Mixed-Use
Concept B: Lower
Density Reside
Leave things alone. Stop hiring consultants
to help the city figure out how to increase
revenue. "Growth for the sake of growth is
the 'ideology' of the cancer cell.” -Edward
Abbey
3583
Concept A: Higher
Density Resid
Higher density residential areas should be
planned close to the freeway, this area in
Sedco Hills is perfect
Concept C: Mixed-Use
Concept B: Lower
Density Reside
Concept B: Lower
Density Reside
Concept A: Higher
Density Resid
Concept A is more functional. Concept C
concerns are what type of business we are
looking at and will they actually help the
community? drawback is displaced longtime
residents, cost to purchase and cost to
relocate them. City trust will be tarnished!
Concept C: Mixed-Use
Concept C: Mixed-Use
other Leave it the way it is
Concept B: Lower
Density Reside
Concept B: Lower
Density Reside
other Recreation/leave it
Will these concepts affect the Dairy, Jump
Elsinore and/or the moto track?
Concept B: Lower
Density Reside
Concept B: Lower
Density Reside
Concept B: Lower
Density Reside
Concept C: Mixed-Use
Concept B: Lower
Density Reside
Concept A: Higher
Density Resid
Concept C: Mixed-Use
mission trail and corydon area already
looking congested with new building -
better planning please!
Concept B: Lower
Density Reside
Concept B: Lower
Density Reside
Concept B: Lower
Density Reside
Concept B: Lower
Density Reside
3584
Concept B: Lower
Density Reside
Concept C: Mixed-Use
Concept C: Mixed-Use
Concept B: Lower
Density Reside
Concept B: Lower
Density Reside
Concept C: Mixed-Use
Concept B: Lower
Density Reside
With Summerly across the street as wel as
the govt assisted cottages higher residential
will literally turn this into the projects. I am
not talking immediately but in 20 years time
when things began to be forgotten.

Concept B: Lower
Density Reside
Concept B: Lower
Density Reside
Old Town Communty wih Residential and
Commercial land built to specfic standards. I
have a plan that uses concept B&C
other Neither
Keep our livestock and horse trails safe. No
need for more traffic congestion
Concept B: Lower
Density Reside
Concept C: Mixed-Use
Concept B: Lower
Density Reside
Concept B: Lower
Density Reside
Concept C: Mixed-Use
Higher density would look bet because
across Mission Trail is high density already
built.

Concept B: Lower
Density Reside
Concept B: Lower
Density Reside
Focus Area 2
Responses Other (Write in Concept) Additional Comments
Concept B: Mixed-Use
3585
Concept A: All
Residential
Best option for being near elementary
school. That is the key considerationkeeping students safe and their best interests (more students more funding for
the school etc).

Concept B: Mixed-Use
Concept B: Mixed-Use
This area should be allowed to have
commercial/industrial along the main roads
to match the LE side
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept A: All
Residential
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
other

STOP BUILDING WITHOUT

INFRASTRUCTURE AND UPDATING
ROADWAYS FIRST!!!
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept A: All
Residential
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept A: All
Residential
Concept B: Mixed-Use
Concept B: Mixed-Use
other Leave it as is.

Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use More Commercial Industrial
Concept B: Mixed-Use
near school and high volume traffic area -
traffic calming features and safe
walkways???
3586
other
Concept B: Mixed-Use
Concept A: All
Residential
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
other leave it alone
Concept B: Mixed-Use
other
Lake Elsinore side has industry so make
Wildomar side industrial
other Need traffic impact & more info
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept A: All
Residential
other Leave it land
Concept B: Mixed-Use
Concept A: All
Residential
other Leave this area as it is.
other
Concept A: All
Residential
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept A: All
Residential
other Large size lots.

Concept B: Mixed-Use
Concept B: Mixed-Use
Concept A: All
Residential
Concept B: Mixed-Use
Concept A: All
Residential
Concept B: Mixed-Use
Concept B: Mixed-Use
other
Stop build shit until the
infrastructure can handle the
demand!!!
Stop build shit until the infrastructure can
handle the demand!!!
3587
other
Level it and make it a waterfront
park
other Keep land rural and low density.

Concept A: All
Residential
Concept B: Mixed-Use
Concept B: Mixed-Use
other
Concept B: Mixed-Use
Concept A: All
Residential
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept A: All
Residential
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept A: All
Residential
Concept B: Mixed-Use
other Leave as is.

Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept A: All
Residential
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept A: All
Residential
Concept A: All
Residential
Concept B: Mixed-Use
Concept A: All
Residential
Concept B: Mixed-Use
Concept A: All
Residential
Concept B: Mixed-Use
3588
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
other
Low density residential mix of small
commercial.

Concept A: All
Residential
other No housing
Stop wasting money and you won't need
high density housing
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
other Rural
other
Mixed may be ok if it's a small
commercial area, not big businesses
that will put the local people out of
business, some residential in vacant
areas is ok, without removing
existing trailer parks , so that
Wildomar is still an affordable place
to live.

Mixed may be ok if it's a small commercial
area, not big businesses that will put the
local people out of business, some
residential in vacant areas is ok, without
removing existing trailer parks , so that
Wildomar is still an affordable place to live.
other
Mixed may be ok if it's a small
commercial area, not big businesses
that will put the local people out of
business, some residential in vacant
areas is ok, without removing
existing trailer parks , so that
Wildomar is still an affordable place
to live.

Mixed may be ok if it's a small commercial
area, not big businesses that will put the
local people out of business, some
residential in vacant areas is ok, without
removing existing trailer parks , so that
Wildomar is still an affordable place to live.

Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept A: All
Residential
Concept B: Mixed-Use
Concept B: Mixed-Use
Congestion is very bad dropping off and
picking up children at William Collier School.

Parents block private driveways, many close
calls, students elope which is a very serious
hazard. Very disorganized traffic during an
drop off and pm pick-up
Concept B: Mixed-Use
3589
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept A: All
Residential
Concept A: All
Residential
Concept A: All
Residential
Concept B: Mixed-Use
Concept A: All
Residential
Concept B: Mixed-Use
Concept B: Mixed-Use
other
Concept B: Mixed-Use
Concept B: Mixed-Use
other LEAVE IT ALONE!
Concept A: All
Residential
Concept B: Mixed-Use
other Leave it the way it is….

Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
Please do NOT ruin our city with a bunch of
cheap apartments. Expensive
condominums only.

Concept B: Mixed-Use
other industrial/commercial
other
I don't like either option. They're too busy.

But if there were no other options I'd pick B.

Concept B: Mixed-Use Mixed use and residential
Concept A: All
Residential
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept A: All
Residential
Concept A: All
Residential
Concept A: All
Residential
3590
Concept B: Mixed-Use
Concept A: All
Residential
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept A: All
Residential
Concept B: Mixed-Use
other Single family homes No congestion
Concept B: Mixed-Use
Concept A: All
Residential
Concept B: Mixed-Use We need more shopping and businesses Concept A: All
Residential
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
other
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept A: All
Residential
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept A: All
Residential
Concept B: Mixed-Use
Definitely go with mixed use. Depending on
how it's done, maybe 2/3 residential and
1/3 business.

Concept B: Mixed-Use
Concept B: Mixed-Use
Concept A: All
Residential
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept A: All
Residential
Concept B: Mixed-Use
Concept B: Mixed-Use
other
Leave it alone. We don't want to be
like Irvine or Menifee or every
cookie cutter city.

Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
3591
Concept B: Mixed-Use
Concept B: Mixed-Use
interesting agenda so far, this area is in
need of a change. Drawback a new high
traffic area will be made and infrastructure
issues to follow.

Concept B: Mixed-Use
Concept B: Mixed-Use
other
Concept B: Mixed-Use
Concept A: All
Residential
other
Help with beautification, ie,
sidewalks, landscaping, some lowdensity aprs
Concept A: All
Residential
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept A: All
Residential
Concept A: All
Residential
other
Corydon needs widening to support
more traffic. Both A and B promote
more residential - worried about
increased crime (if i had to choose B
is better i think)
corydon needs to be widened to
accomodate this growth
Concept B: Mixed-Use
Concept A: All
Residential
Concept A: All
Residential
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept A: All
Residential
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
Mixed use is ideal but we have to be
cautious of Lakeland village residents. Lots
of activity there that can and will spill over
into the apartments.

Concept A: All
Residential
3592
Concept B: Mixed-Use
other Neither
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept A: All
Residential
storm drains must be improved in this area
and the City of Wildomar must work to
remove the "Blighted" designation put on
this area by the County of Riverside
Concept A: All
Residential
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
Focus Area 3
Responses Other (Write in Concept) Additional Comments
Concept B: Mixed-Use
Concept A: Commercial
Center
Proximity to freeway will draw in new
business and it is severely needed in this
city.
other
Neither too much traffic and stop
with all the car washes
Concept A: Commercial
Center
Concept B: Mixed-Use
Concept A: Commercial
Center
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept A: Commercial
Center
Concept B: Mixed-Use
other Less dense use
Concept A: Commercial
Center
Concept B: Mixed-Use
Concept A: Commercial
Center
other
NOTHING!! KEEP WILDOMAR
RURAL!!!
Concept A: Commercial
Center
3593
Concept B: Mixed-Use
Concept A: Commercial
Center
Concept A: Commercial
Center
This area is perfect for a commercial center
similar to Murrieta’s development at I-215
and Clinton Keith. High density residential
would also work well on the perimeter of
this area.

Concept B: Mixed-Use
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept B: Mixed-Use
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept B: Mixed-Use
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
other Industrial flex and mixed use
include open space and rooftop agriculture
(not Marijuana cultivation)
other
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept B: Mixed-Use
Concept A: Commercial
Center
other
like there isnt enough traffic, major
accidents etc there already, keep adding to
it with no thought
3594
Concept A: Commercial
Center
other
No more car washes or fast food. Get bigger
restaurants here. I hate driving to Murrieta
or Temecula for a good restaurant
other
Traffic and environmental impact info is
needed
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
other
No more people and building leave
it land
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept B: Mixed-Use I see parking problems with both plans.

Concept A: Commercial
Center
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept B: Mixed-Use
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
3595
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept B: Mixed-Use
other
Stop build shit until the
infrastructure can handle the
demand!!!
Stop build shit until the infrastructure can
handle the demand!!!
Concept B: Mixed-Use
other Minimal low scale development.

Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use No more car washes!!
other Add parks in this neighborhood.

Concept A: Commercial
Center Need a grocery store with in this area
Concept A: Commercial
Center
Concept B: Mixed-Use
Concept B: Mixed-Use
other Residential would be best
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept B: Mixed-Use
other
Improve road way, already high traffic with
little space
Concept A: Commercial
Center
Nothing should be done until the roads can
handle the traffic. Bundy and Orange could
use help as people turn left in front of
people with the right away constantly.

Concept B: Mixed-Use
Concept A: Commercial
Center
3596
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center Looks like a good place for small biz
Concept A: Commercial
Center
other No expansion off of bundy
Concept B: Mixed-Use
other None
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept B: Mixed-Use
Concept A: Commercial
Center
Stop pushing high density housing in
Wildomar
other Leave as is Leave as is
Concept B: Mixed-Use
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept B: Mixed-Use
other Rural
3597
other
This looks like a traffic nightmare.

Mixed Use with half of what's
proposed, in order to prevent
inescapable traffic flow issues
The people in the imediate adjacent
neighborhoods should be considered on
this. This looks like a traffic nightmare.

Mixed Use with half of what's proposed in
order to prevent inescapable traffic flow
issues
other
This looks like a traffic nightmare.

Mixed Use with half of what's
proposed, in order to prevent
inescapable traffic flow issues
This looks like a traffic nightmare. Mixed
Use with half of what's proposed, in order
to prevent inescapable traffic flow issues
Concept A: Commercial
Center
Concept B: Mixed-Use
Concept A: Commercial
Center
Consider broader commercial, rather than
just neighborhood commercial, freeway
access/proximity
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept B: Mixed-Use
As long as signals are synchronized. Need
steady flow of traffic getting on and off
freeway.

Concept A: Commercial
Center Some parts would be nice
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept A: Commercial
Center
other
Concept A: Commercial
Center
Concept A: Commercial
Center
3598
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
other Nothing…
We are soon to lose our funky and great
small town atmosphere.

Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept A: Commercial
Center
Concept B: Mixed-Use
And we do NOT want to downgrade our city
just to make it more populated. Let's try to
keep it as upscale as possible. Lake Elsinore
is already the affordable housing district
and that is close enough.

Concept B: Mixed-Use
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center Prime commercial
Concept A: Commercial
Center
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept A: Commercial
Center
Concept B: Mixed-Use
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept B: Mixed-Use
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept A: Commercial
Center
3599
Concept B: Mixed-Use
other Single family homes
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center More shopping and restaurants needed.

Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept B: Mixed-Use
Mixed use would be fine, but here the
percentage should be at least 2/3 business.

Concept A: Commercial
Center
Concept A: Commercial
Center
Concept B: Mixed-Use
Concept A: Commercial
Center
Concept B: Mixed-Use
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
3600
other Leave it alone
Concept B: Mixed-Use
Large commercial centers will be fading out
over the next 20 years, mixed use and open
space with lots of shade trees would be
perfect here.

Concept B: Mixed-Use
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
A makes sense, Drawback is Wildomar is
behind on getting the right businesses in
our city. Need new idea restaurants and
business in place! tired of seeing the same
restaurant / retailer on every corner! Make
Wildomar unique and fun to visit and stay!
Concept A: Commercial
Center
Concept B: Mixed-Use
other There's too much traffic already
Concept A: Commercial
Center
Concept B: Mixed-Use
other
B, mixed use with everything lowlevel. Trader Joe's and local business opportunities, skatepark or
a safe place for kids after
school/community gathering area
See above. No huge or corporate
buildings/businesses with the exception of
above-mentioned
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept B: Mixed-Use
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept B: Mixed-Use
Concept A: Commercial
Center
widening Bundy Cyn only to Canyon Ranch
is short-sighted and creates traffic
nightmare as road narrows. Would be great
to see area developed similar to nice retail
and restaurants on Clinton Keith!
Concept A: Commercial
Center
3601
Concept A: Commercial
Center
Concept B: Mixed-Use
Concept A: Commercial
Center
That area is high traffic already why add a
plaza or more homes . There is always
accident right before the freeway entrance
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept B: Mixed-Use
Concept A: Commercial
Center
other
It's a canyon Please don't over build.

Keep the beautiful open space. Why
tear down the hills.

Concept A: Commercial
Center
Concept B: Mixed-Use
Concepto B: Uso mixto Necesitamos más centros comerciales secas Focus Area 4
Responses Other (Write in Concept) Additional Comments
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
3602
other Neither leave it open
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
as long as safety for the kids coming and
going is top priority
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
other

STOP BUILDING WITHOUT
UPDATING INFRASTRUCTURE!!!!
Concept A: Commercial
Uses with
other No change
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Focus on a walkable downtown with mixed
uses and gathering spaces. Include features
such as roundabouts and street parking to
slow traffic down. A good example is what
City of Vista has done with their downtown
and Paseo Santa Fe project.

Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
3603
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept B: Mixed-Use
Concept A: Commercial
Uses with
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept A: Commercial
Uses with
This is not the heart of the city. Heart is
located southwest of this focus area
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
other
cemetery, open space, agriculture,
arena, farmer's market and food
trucks
lack of water access in some areas. Check
liquefaction and soil stability issues.
other
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
other See notes
No car washes, or drive thrus, or crappy
chain restaurants that are at every exit. And
whatever it is, allow for parking, because
every recent commercial build area has
TERRIBLE parking.

Concept A: Commercial
Uses with
other
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Should never be high residential in
Wildomar
Concept A: Commercial
Uses with Need more info
Concept A: Commercial
Uses with
Yes please Wildomar needs a “main st” like
in Lake Elsinore and Temecula
other
Neither option. That space has too
much traffic with all 3 schools using
the route
Concept B: Mixed-Use
3604
Concept B: Mixed-Use
other
continue to keep majority of rural
with some parks and animal friendly
areas. How are we to get our horses
to trail areas?
Dillon Cir is low density and it show as
medium density. My surrounding
neighborhood is also incorrectly identified
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept B: Mixed-Use
other
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
other
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
other Old town vision plan
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept B: Mixed-Use
Concept A: Commercial
Uses with
other
Stop build shit until the
infrastructure can handle the
demand!!!
Stop build shit until the infrastructure can
handle the demand!!!
Concept A: Commercial
Uses with
other
Low scale buildings and
development.
3605
Concept B: Mixed-Use
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
other
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with Park
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept B: Mixed-Use
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
other Leave as is
Concept B: Mixed-Use
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
other
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept A: Commercial
Uses with
3606
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with Maybe A but could go b
Concept A: Commercial
Uses with
other
Concept B: Mixed-Use
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A BUT without disrupting any
elects that make it historically significant
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept B: Mixed-Use
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with Preserve the old town feel and historic areas Concept A: Commercial
Uses with
Concept A: Commercial
Uses with No high density housing in Wildomar
Concept A: Commercial
Uses with
Concept B: Mixed-Use
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
other Rural ranches, equestrian
Concept A: Commercial
Uses with
Making sure not to push out the existing
mobile homes and trailer parks.

Concept A: Commercial
Uses with
Making sure not to push out the existing
mobile homes and trailer parks.

Concept A: Commercial
Uses with
3607
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept B: Mixed-Use
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept B: Mixed-Use
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept A: Commercial
Uses with
other
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
3608
Concept B: Mixed-Use
Yes we should have an "Old Town
Wildomar" Albertsons' Shopping Center is
NOT what I would call the city center.

Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
I like the concept of community space with
an old town feel. But, again, keep it rural
with low density housing.

Concept A: Commercial
Uses with
Old Town style development, similar to
Temecula Old Town.

Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept B: Mixed-Use
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with A unique idea for this space
3609
Concept B: Mixed-Use
Need to keep a downtown area with shops
and vendors and hang outs for all ages to go
to like old town Temecula
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
other
It would be great to put our resources &
monies into having our own police station
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Mixed use could work too, but it would
need to bring with it the key parts of
Concept A
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept B: Mixed-Use
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
3610
other
None of these concepts fit
Wildomar. We aren't Irvine.

Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Draw back high traffic issues to follow with
infrastructure concerns. need plenty of
public parking. parking lots can be used for
farmers markets.

Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
could be really beautiful and an attractive
place - like old town Temecula!
Concept B: Mixed-Use
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
3611
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
This is an ideal area for a civic center with
city offices and amenities (combine indoor
recreation/meeting/event space/municipal
library/historical display/archive space, plus
commercial/office space for restaurants,
cafés, etc.

Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Please, no traffic congestion…keep us safe
and all children, including those attending
the elementary school.

Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
Improve Murrieta Creek trail as a safe and
beautiful walk and bikeway of non vehicle
travel. travel
Concept A: Commercial
Uses with
Concept A: Commercial
Uses with
3612
Focus Area 5
Responses Other (Write in Concept) Additional Comments
Concept B: Allow a Mix
of Uses
Concept A: Primarily
Commercial
Concept A: Primarily
Commercial
Concept A: Primarily
Commercial
My answers are based on 20 years into the
future, and not the immediate wants of the
City. We might not have businesses ready to
build today, but with the surrounding cities
filling up quickly, they will eventually come
our way.

Concept B: Allow a Mix
of Uses
Concept A: Primarily
Commercial
Concept B: Allow a Mix
of Uses
Concept A: Primarily
Commercial
Concept A: Primarily
Commercial
My concern for both projects is the streets.

They are already overwhelmed and the
current construction on Baxter, sorry
Wildomar Trail, makes is awful to get on
and off fwy. Wish roads were widened and
made safer before the construction started
Concept B: Allow a Mix
of Uses
Concept B: Allow a Mix
of Uses
Concept B: Allow a Mix
of Uses
Concept A: Primarily
Commercial
Concept B: Allow a Mix
of Uses
Concept B: Allow a Mix
of Uses
Concept B: Allow a Mix
of Uses
3613
other

STOP BUILDING WITHOUT

UPDATING INFRASTRUCTURE IN

FAVOR OF NOT YOU TAX MONEY

PAID PEOPLE BUT US MIDDLE CLASS
CITIZENS!!!!
Concept B: Allow a Mix
of Uses
Concept B: Allow a Mix
of Uses
Concept B: Allow a Mix
of Uses
Concept B: Allow a Mix
of Uses
Keep this area mixed use. Focus on large
commercial centers at Clinton Keith and
Bundy Canyon.

Concept B: Allow a Mix
of Uses
Concept B: Allow a Mix
of Uses
Concept A: Primarily
Commercial
Concept B: Allow a Mix
of Uses
Concept B: Allow a Mix
of Uses
Concept B: Allow a Mix
of Uses
Concept B: Allow a Mix
of Uses
Concept B: Allow a Mix
of Uses
Concept A: Primarily
Commercial
other
Civic center with a jail, we will need
it with what is being built across the
freeway
Concept A: Primarily
Commercial
Concept A: Primarily
Commercial
Concept A: Primarily
Commercial
Concept B: Allow a Mix
of Uses
other
other
Limited commercial use and keep as
much natural land
3614
Concept A: Primarily
Commercial
Concept B: Allow a Mix
of Uses
other Leave it as it is.

Concept B: Allow a Mix
of Uses
other
Concept B: Allow a Mix
of Uses
other No more high to medium residential
Concept B: Allow a Mix
of Uses Need more info
Concept B: Allow a Mix
of Uses
Concept A: Primarily
Commercial
Concept B: Allow a Mix
of Uses
Concept B: Allow a Mix
of Uses
Concept B: Allow a Mix
of Uses
Concept B: Allow a Mix
of Uses
Concept A: Primarily
Commercial
Concept B: Allow a Mix
of Uses
other No more building and no more people
other develop a community use park, ball fields
Concept A: Primarily
Commercial
Concept B: Allow a Mix
of Uses
other
Concept B: Allow a Mix
of Uses
Concept B: Allow a Mix
of Uses
Concept A: Primarily
Commercial
Concept A: Primarily
Commercial
3615
Concept A: Primarily
Commercial
Concept B: Allow a Mix
of Uses
Concept A: Primarily
Commercial
Concept B: Allow a Mix
of Uses
Concept A: Primarily
Commercial
Concept B: Allow a Mix
of Uses
Concept B: Allow a Mix
of Uses
Concept B: Allow a Mix
of Uses
other
Stop build shit until the
infrastructure can handle the
demand!!!
Stop build shit until the infrastructure can
handle the demand!!!
Concept B: Allow a Mix
of Uses
Concept A: Primarily
Commercial
Concept B: Allow a Mix
of Uses
Concept A: Primarily
Commercial
Concept A: Primarily
Commercial
Concept B: Allow a Mix
of Uses
Concept B: Allow a Mix
of Uses
other Civic Center would be perfect here.

Concept B: Allow a Mix
of Uses
Concept A: Primarily
Commercial
Concept B: Allow a Mix
of Uses
Concept B: Allow a Mix
of Uses
other Rural Residential
Concept A: Primarily
Commercial
3616
Concept A: Primarily
Commercial
Concept B: Allow a Mix
of Uses
Concept B: Allow a Mix
of Uses
Concept B: Allow a Mix
of Uses
Concept A: Primarily
Commercial
other
Concept B: Allow a Mix
of Uses
Concept B: Allow a Mix
of Uses
Concept B: Allow a Mix
of Uses
Concept B: Allow a Mix
of Uses
Concept B: Allow a Mix
of Uses
Concept B: Allow a Mix
of Uses
Concept A: Primarily
Commercial
Concept B: Allow a Mix
of Uses
Concept A: Primarily
Commercial
Concept A: Primarily
Commercial
Concept B: Allow a Mix
of Uses Don’t really know the difference
Concept B: Allow a Mix
of Uses
Concept A: Primarily
Commercial
Concept B: Allow a Mix
of Uses
Concept B: Allow a Mix
of Uses
Concept A: Primarily
Commercial
other
I don’t know enough about the area
to weigh in responsibly
Concept B: Allow a Mix
of Uses
3617
other Leave it alone
Concept A: Primarily
Commercial
Concept B: Allow a Mix
of Uses
Concept B: Allow a Mix
of Uses
Concept A: Primarily
Commercial
other
Leave it rural with rural type
housing, small commercial
Concept B: Allow a Mix
of Uses
other
No multi-story buildings off of that
area, will reduce existing property
owners views and damage image of
Wildomar
other Kaiser and done
Concept A: Primarily
Commercial
Concept B: Allow a Mix
of Uses
Concept B: Allow a Mix
of Uses
Concept B: Allow a Mix
of Uses
other
other
Wait to see how the consequences
of A and B play out.

Wait to see how the consequences of A and
B play out. Daddy always said measure
twice, cut once.
other
Wait to see how the consequences
of A and B play out.

Wait to see how the consequences of A and
B play out. Daddy always said measure
twice, cut once.

Concept B: Allow a Mix
of Uses
Concept A: Primarily
Commercial
Concept A: Primarily
Commercial
Concept A: Primarily
Commercial
Concept B: Allow a Mix
of Uses
Concept A: Primarily
Commercial
Concept B: Allow a Mix
of Uses
3618
Concept B: Allow a Mix
of Uses
Concept B: Allow a Mix
of Uses
Concept B: Allow a Mix
of Uses
Concept B: Allow a Mix
of Uses
Concept A: Primarily
Commercial
Concept A: Primarily
Commercial
Concept A: Primarily
Commercial
Concept B: Allow a Mix
of Uses
Concept A: Primarily
Commercial
Concept B: Allow a Mix
of Uses
Concept B: Allow a Mix
of Uses
Concept B: Allow a Mix
of Uses
Concept A: Primarily
Commercial
Concept B: Allow a Mix
of Uses
Concept B: Allow a Mix
of Uses
other
Concept B: Allow a Mix
of Uses
Concept A: Primarily
Commercial
Concept B: Allow a Mix
of Uses
Concept B: Allow a Mix
of Uses
Concept A: Primarily
Commercial
The homes south of Wildomar Trail on
north of Peggy Lane are an eye sore. Do we
really need manufactured homes and
trailers anywhere in Wildomar? I say NO!
Concept B: Allow a Mix
of Uses
3619
Concept B: Allow a Mix
of Uses
Concept A: Primarily
Commercial
Concept A: Primarily
Commercial
Large scale sales tax generators like RV
sales, heavy equipment sales, etc.

Concept A: Primarily
Commercial
Concept B: Allow a Mix
of Uses
Concept B: Allow a Mix
of Uses
Concept A: Primarily
Commercial
Concept B: Allow a Mix
of Uses
Concept A: Primarily
Commercial
Concept B: Allow a Mix
of Uses
Concept B: Allow a Mix
of Uses
Concept B: Allow a Mix
of Uses
Concept B: Allow a Mix
of Uses
Concept A: Primarily
Commercial
Concept A: Primarily
Commercial
Concept B: Allow a Mix
of Uses
Concept A: Primarily
Commercial
Need to take freeway access into
consideration, too many residential
buildings would present a traffic issue.

Concept A: Primarily
Commercial
Concept B: Allow a Mix
of Uses
Concept A: Primarily
Commercial
other Nothing
It’s already getting overdeveloped and
congested here. How about leaving some of
the city alone for that rural area you keep
claiming we are
Concept B: Allow a Mix
of Uses
3620
Concept B: Allow a Mix
of Uses
Concept A: Primarily
Commercial
Concept B: Allow a Mix
of Uses
Concept A: Primarily
Commercial
other
Concept A: Primarily
Commercial
Concept B: Allow a Mix
of Uses
Concept B: Allow a Mix
of Uses
Concept B: Allow a Mix
of Uses
Concept A: Primarily
Commercial
Concept B: Allow a Mix
of Uses
Concept B: Allow a Mix
of Uses
Concept A: Primarily
Commercial
Concept B: Allow a Mix
of Uses
Concept B: Allow a Mix
of Uses
Concept B: Allow a Mix
of Uses
Concept B: Allow a Mix
of Uses
Concept B: Allow a Mix
of Uses
Concept A: Primarily
Commercial
Concept A: Primarily
Commercial
Concept B: Allow a Mix
of Uses
other Nope. Leave it alone
Concept B: Allow a Mix
of Uses
Concept B: Allow a Mix
of Uses
3621
Concept A: Primarily
Commercial
Concept B: Allow a Mix
of Uses
Concept B: Allow a Mix
of Uses traffic issues and infrastructure concerns
Concept B: Allow a Mix
of Uses
Concept B: Allow a Mix
of Uses
other Leave it alone
Concept A: Primarily
Commercial
Concept B: Allow a Mix
of Uses
Concept B: Allow a Mix
of Uses
Since this wonderful area has already been
desecrated, allow continuation of corporate
use to feed the greed to therefore,
hopefully, satisfaction and draw the soughtafter revenue Concept A: Primarily
Commercial
Concept A: Primarily
Commercial
Concept B: Allow a Mix
of Uses
Concept B: Allow a Mix
of Uses
Concept B: Allow a Mix
of Uses
other
Would prefer to leave rural, and natural,
with walking trails or horse riding trails.

Concept A: Primarily
Commercial
Kaiser would be FANTASTIC! Would be
great if hotel was Marriott or other higher
end option. We don't have decent place for
visitors to stay in the area unless they stay
in Murrieta now.

Concept A: Primarily
Commercial
Concept B: Allow a Mix
of Uses
Concept B: Allow a Mix
of Uses
Concept A: Primarily
Commercial
Concept B: Allow a Mix
of Uses
3622
Concept B: Allow a Mix
of Uses
Concept A: Primarily
Commercial
Concept B: Allow a Mix
of Uses
Concept B: Allow a Mix
of Uses
Concept B: Allow a Mix
of Uses
Concept B: Allow a Mix
of Uses I don’t really see the cities need for a hotel.

Concept B: Allow a Mix
of Uses
Concept B: Allow a Mix
of Uses
Concept A: Primarily
Commercial
I’m lease take into account that residences
usually do not have one vehicle. !
Concept B: Allow a Mix
of Uses
Concept A: Primarily
Commercial
Concept B: Allow a Mix
of Uses
Concept A: Primarily
Commercial
Concept B: Allow a Mix
of Uses
No Large Ugly buildings that hide the beauty
of Santa Ana mountain range from the 15
fwy.

Concept B: Allow a Mix
of Uses
Concept B: Allow a Mix
of Uses
Focus Area 6
Responses Other (Write in Concept) Additional Comments
Concept A: Mixed-Use
Concept B: Residential
Concept B: Residential
Concept A: Mixed-Use
Concept B: Residential
3623
Concept A: Mixed-Use
other Park, community area
Concept A: Mixed-Use
Concept B: Residential
Concept A: Mixed-Use
Concept B: Residential
Concept A: Mixed-Use
Concept B: Residential
Concept A: Mixed-Use
Concept A: Mixed-Use
Concept B: Residential
other

STOP BUILDING WITHOUT
UPDATING INFRASTRUCTURE. LEAVE
WILDOMAR RURAL!!!!
Concept B: Residential
Concept B: Residential
Concept B: Residential
Concept A: Mixed-Use
Any frontage along Clinton Keith should be
commercial. Higher density residential and
commercial along Palomar. This section
along Palomar has a lot of blight for how
visible it is. Unfortunate that recent
mobile/modular homes were permitted
along here.

Concept B: Residential
Concept A: Mixed-Use
Concept B: Residential
Concept B: Residential
Concept B: Residential
Concept B: Residential
Concept B: Residential
Concept A: Mixed-Use
Concept A: Mixed-Use
3624
other
Leave it alone, already has
numerous newer mobile homes
Concept A: Mixed-Use
Concept A: Mixed-Use
Concept A: Mixed-Use
Concept B: Residential
Keep it lower density residential to lessen
traffic impacts
other
Concept B: Residential
Concept A: Mixed-Use
Concept B: Residential
other Leave it as it is
Concept B: Residential
other
Concept B: Residential
other
More commercial in this area by the
creek area
The creek isn’t really maintained and
cleared of trees/bushes. Make the area
around the creek commercial
other Need more info
Concept A: Mixed-Use
Concept A: Mixed-Use
Concept B: Residential
Concept A: Mixed-Use
other Sports park/ regional park
If every area has multiunit homes where is
the rural Wildomar? We need open space.

There seems to be no open land nor wildlife
corridors being left. Why are there no parks
win these plans? Our kids went to Menifee
for parks/sports for the last 30 years
Concept B: Residential
Concept A: Mixed-Use
Concept B: Residential
other
Such a Joke that you took our
history away!! Wildomar Trail…
what a joke
Concept B: Residential
Concept A: Mixed-Use
3625
other
Leave the land designation as it is
now.

Concept B: Residential
Concept A: Mixed-Use
Concept A: Mixed-Use
Concept A: Mixed-Use
Concept B: Residential
other
Large lots, single family residential.

Maybe mobile homes.

Concept A: Mixed-Use
Concept A: Mixed-Use
other open space recreational
Concept A: Mixed-Use
Concept A: Mixed-Use
Concept B: Residential
Concept A: Mixed-Use
other
Stop build shit until the
infrastructure can handle the
demand!!!
Stop build shit until the infrastructure can
handle the demand!!!
Concept A: Mixed-Use
other Open land minimal development.

Concept B: Residential
Concept A: Mixed-Use
Concept B: Residential
Concept A: Mixed-Use
Concept B: Residential
Concept B: Residential
Concept A: Mixed-Use
Concept A: Mixed-Use
Concept A: Mixed-Use
Concept A: Mixed-Use
Concept B: Residential
Concept B: Residential
Concept A: Mixed-Use
Concept A: Mixed-Use
Concept A: Mixed-Use
Concept B: Residential
3626
Concept A: Mixed-Use
Concept A: Mixed-Use
Concept B: Residential
Concept A: Mixed-Use
Concept B: Residential
Concept A: Mixed-Use
Concept A: Mixed-Use
Concept A: Mixed-Use
Concept A: Mixed-Use
Concept A: Mixed-Use
Concept A: Mixed-Use
Concept B: Residential
Concept B: Residential No low income apts here pleasssseee!!!!! other
Anything other than houses, car
washes, restaurants and gas
stations. PLEASE! A water park, dog
park, baseball field, roller rink,
hockey rink, event center, etc.
other
Concept B: Residential
Concept B: Residential
Concept B: Residential
other
I don’t know enough about the area
to weigh in responsibly
Concept A: Mixed-Use
Concept B: Residential
Concept B: Residential
Concept B: Residential
Concept B: Residential
Concept A: Mixed-Use
Concept B: Residential
Why cant land just remain land....make
trails, parks, wildlife areas that benefit ALL
Concept B: Residential
3627
other No housing
Without promoting small business usage,
Wildomar will only continue to lose
residents
Concept B: Residential
Concept B: Residential
Concept A: Mixed-Use
Concept B: Residential
Concept A: Mixed-Use
other
other
It's hard to tell what's being
proposed. The map shows lots of
commercial surrounding the future
general plan area, but doesn't state
that. So it's hard to tell what will be
best to counter that.This area
should be considered in conjunction
with Area 7
This area should be considered in
conjunction with Area 7
other
It's hard to tell what's being
proposed. The map shows lots of
commercial surrounding the future
general plan area, but doesn't state
that. So it's hard to tell what will be
best to counter that.This area
should be considered in conjunction
with Area 7
This area should be considered in
conjunction with Area 7
Concept B: Residential
Concept A: Mixed-Use
Concept B: Residential
Concept B: Residential
Concept B: Residential
Concept A: Mixed-Use
Concept B: Residential
Concept A: Mixed-Use
Concept A: Mixed-Use
Concept B: Residential
Concept A: Mixed-Use
Concept A: Mixed-Use
Concept A: Mixed-Use
3628
Concept A: Mixed-Use
Concept A: Mixed-Use
Concept A: Mixed-Use
Concept A: Mixed-Use
Concept A: Mixed-Use
Concept A: Mixed-Use
other LEAVE IT ALONE!
Concept B: Residential
Concept B: Residential
other No building there…
Concept B: Residential
Concept B: Residential
Concept A: Mixed-Use
Concept A: Mixed-Use
Concept B: Residential
Please do NOT ruin our city with a bunch of
cheap apartments. Expensive
condominums only.

Concept A: Mixed-Use
Concept A: Mixed-Use
other Mixed use and low density housing.
other Hotel, Condos, Mixed Use
Concept B: Residential
Concept B: Residential
Concept B: Residential
Concept B: Residential
Concept B: Residential
Concept B: Residential
Concept B: Residential
Concept A: Mixed-Use
Concept B: Residential
Concept A: Mixed-Use
Concept B: Residential
Concept B: Residential
3629
Concept B: Residential
Concept B: Residential
Concept A: Mixed-Use Non-residential preferred.

Concept B: Residential
Don’t take away our country atmosphere.

Let Wildomar be Wildomar 🤷🤷🤷🤷🤷
Concept A: Mixed-Use
other Nothing or green space
Again aren’t we suppose to be a semi-rural
area. Stop developing everything
Concept A: Mixed-Use More shopping like Dos Lagos
Concept B: Residential
Concept A: Mixed-Use
Concept A: Mixed-Use
Concept A: Mixed-Use
Concept B: Residential
Concept B: Residential
Concept B: Residential
Concept B: Residential
Concept A: Mixed-Use
Concept A: Mixed-Use
Concept A: Mixed-Use
Concept A: Mixed-Use
Concept A: Mixed-Use
Concept B: Residential
Concept A: Mixed-Use
Concept B: Residential
Business tend not to do well here, also I
think you're overlooking the several news
homes that have been built there in the last
two years
Concept B: Residential
Concept A: Mixed-Use
Concept A: Mixed-Use
Concept B: Residential
Concept B: Residential
3630
other
This area is a liquifation zone, fault
zone and the location of historical,
cultural and paleontologic
resources. Leave it alone.

Concept B: Residential
Medium and high density residential would
be great in this general area.

Concept B: Residential
Concept B: Residential
Concept B: Residential
Concept B: Residential
increased traffic concerns, infrastructure
concerns. a public park is needed in this
area as well to help with the current
environmental ecosystem in that area that
will be removed. let's keep some of
Wildomar wilderness
Concept B: Residential
Concept B: Residential
other How about an community garden
Concept A: Mixed-Use
Concept B: Residential
other
Keep rural, especially with the need
for preservation of the creek and
surrounding area with already
pushed-out wildlife See above comment
Concept B: Residential
Concept A: Mixed-Use
Concept A: Mixed-Use
Concept B: Residential
Concept A: Mixed-Use
Concept A: Mixed-Use
Concept B: Residential
where are the options for more recreational
space? if this is near regional trail can't we
enhance that instead of closing off access
(residential only) or encouraging crime (high
density)?
Concept B: Residential
3631
Concept A: Mixed-Use
Concept A: Mixed-Use
Concept A: Mixed-Use
Concept A: Mixed-Use
Concept A: Mixed-Use
Concept A: Mixed-Use
Concept B: Residential
other Parks, we need family things
We need more outside family areas, parks,
enough of the houses!
Concept B: Residential
Concept B: Residential
Concept B: Residential
other
Concept A: Mixed-Use
A few single townhomes would be
acceptable.

Concept B: Residential
Concept A: Mixed-Use
Concept A: Mixed-Use
Concept B: Residential
Near existing residential including Bear
Creek. Commercial should be closer to the
Freeway.

Concept A: Mixed-Use
I don't like either. Keep it simple! Gateway
to Santa Rosa Plateau
other
Do not build Romany
townhouse,condominium or apartments.

This will pack the city with alot of people
Concept B: Residential
Focus Area 7
Responses Other (Write in Concept) Additional Comments
Concept B: Mixed-Use
Concept A: Commercial
Center
Concept A: Commercial
Center
3632
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept B: Mixed-Use
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept A: Commercial
Center
other Leave it alone
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
other
NONE OF THE ABOVE. KEEP
WILDOMAR RURAL!!!!
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
Residential planned development would be
great in this area. Focus commercial around
Clinton Keith and Palomar.

Concept A: Commercial
Center
Concept A: Commercial
Center
Concept B: Mixed-Use
other
Some type of fun center like great
wolf lodge
Concept B: Mixed-Use
Concept A: Commercial
Center
Concept B: Mixed-Use
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept B: Mixed-Use
3633
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept B: Mixed-Use Senior housing
other
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
other
Concept B: Mixed-Use
Concept A: Commercial
Center
other Undecided need more info
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept A: Commercial
Center
Concept A: Commercial
Center
other Your plans suck
Concept A: Commercial
Center
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept A: Commercial
Center
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept A: Commercial
Center
3634
Concept A: Commercial
Center
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept B: Mixed-Use
other
Stop build shit until the
infrastructure can handle the
demand!!!
Stop build shit until the infrastructure can
handle the demand!!!
Concept A: Commercial
Center
other Leave open land.
other Residential
Concept A: Commercial
Center
Concept A: Commercial
Center
other
Concept A: Commercial
Center
Concept B: Mixed-Use
Do not put civic center here. Not central
enough.

Concept B: Mixed-Use
Concept B: Mixed-Use
Concept A: Commercial
Center
Concept B: Mixed-Use
other Rural
Concept A: Commercial
Center
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
3635
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept B: Mixed-Use
other
Concept A: Commercial
Center
Concept B: Mixed-Use
Concept A: Commercial
Center
Concept B: Mixed-Use
other Leave it rural
Concept A: Commercial
Center
Concept A: Commercial
Center
Mirror what is over by. The coffee shop
across the street….same country style
buildings
Concept A: Commercial
Center
other
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept A: Commercial
Center
Concept B: Mixed-Use
Concept A: Commercial
Center
Concept B: Mixed-Use
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept B: Mixed-Use
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
other No housing NO HIGH DENSITY HOUSING
Concept A: Commercial
Center
Concept A: Commercial
Center
3636
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
other
Concept B: Mixed-Use
This area should be considered in
conjunction with Area 6
Concept B: Mixed-Use
This area should be considered in
conjunction with Area 6
Concept A: Commercial
Center
Concept B: Mixed-Use
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept A: Commercial
Center
3637
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept A: Commercial
Center
Nobody really wants to live right next to an
Interstate Highway.

Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center Combination of A and B
Concept A: Commercial
Center
other Put nothing!
Concept A: Commercial
Center
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept A: Commercial
Center
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept B: Mixed-Use
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
3638
Concept B: Mixed-Use
Concept A: Commercial
Center
Concept A: Commercial
Center
Parks and shopping with a river walk area
with walking trails
Concept B: Mixed-Use
Concept A: Commercial
Center
Concept B: Mixed-Use
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept B: Mixed-Use
I suggest concept B only if the bulk of the
area were to remain for business. No more
than 15-20% residential.

Concept B: Mixed-Use
Concept A: Commercial
Center
Concept B: Mixed-Use
Concept A: Commercial
Center
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept A: Commercial
Center
other
None of the options are auit le for
this area. Low density residential is
the true feel of Wildomar. No tilt up
warehouse nonsense!
Concept A: Commercial
Center
Although Wildomar trail can be considered
Old Town Wildomar, there's no doubt that
Clinton Keith is the main thoroughfare.

Mostly commercial in this area would be
great
3639
other Residental
Concept A: Commercial
Center
Concept A: Commercial
Center
other
Convention Center with an outdoor
Ampitheater/stage to bring people
to visit, surrounded with a
commercial center with hotels &
restaurants for day and night
venues. drawback high traffic &
infrastructure concerns & potential
investment, investor issues?
Concept B: Mixed-Use
Concept B: Mixed-Use
other
Concept A: Commercial
Center
Concept B: Mixed-Use
Concept B: Mixed-Use
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept B: Mixed-Use
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center include some green space here please
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept B: Mixed-Use
Concept A: Commercial
Center
3640
Concept B: Mixed-Use
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
other
Let's keep it natural. Perhaps a hiking trail.

It's so beautiful. I would love to protect it.

Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
Concept A: Commercial
Center
I like concept A because large TALL buildings
are restricted to our beautiful natural hills.

We don't need a lot of concrete!!
other
Concept B: Mixed-Use
Focus Area 8
Responses Other (Write in Concept) Additional Comments
Concept A: Industrial
Flex
Concept A: Industrial
Flex
The school will bring in students. They will
seek somewhere to go which will increase
money being spent in the city. Wildomar
doesn’t need more office buildings.

Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
3641
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept B: Traditional
Office
other Leave it alone
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
other

BUILD NOTHING AND KEEP
WILDOMAR RURAL!!!!
Concept A: Industrial
Flex
other
Concept B: Traditional
Office
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
3642
Concept B: Traditional
Office
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
other Mix of "A" & "B"
other
Industrial flex could be sculpture
and arts community like Laguna
Beach Mixed Use
Is "regenerative agriculture" at the MSJC
site or a proposal for the focus area 8?
other
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
other Leave it as is
Concept A: Industrial
Flex
other
other
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
other
No brewing next to a college.

Increased DUI accidents
Concept B: Traditional
Office
Concept A: Industrial
Flex
other Where did the open space go?
The area along La Estrella is wildlife are and
should remain such. Flex industrial is ok
along Clinton Keith.

Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept B: Traditional
Office
other Leave my town alone ! Go away
3643
Concept A: Industrial
Flex
other Parks
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept B: Traditional
Office
Concept B: Traditional
Office
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
other open space park
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Industrial and commercial is great but stop
allowing dispensaries to come into town.

Concept B: Traditional
Office
Concept A: Industrial
Flex
other
Stop build shit until the
infrastructure can handle the
demand!!!
Stop build shit until the infrastructure can
handle the demand!!!
Concept A: Industrial
Flex
other Nature preserve and park
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept B: Traditional
Office
Concept A: Industrial
Flex
3644
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
other Leave it agricultural
Concept B: Traditional
Office
Concept B: Traditional
Office Medical?
3645
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept B: Traditional
Office
Concept A: Industrial
Flex
Concept A: Industrial
Flex
other
I don’t know enough about the area
to weigh in responsibly
I would want to be more educated in the
impact of having things like a brewery
before voting for that
Concept A: Industrial
Flex
Concept B: Traditional
Office
other Open space
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept B: Traditional
Office
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept B: Traditional
Office
Concept A: Industrial
Flex
other
3646
other
Both concepts look like they again
have displaced the people in the
mobile home/trailer parks. A would
be better than B, but really, a
brewery next to a college? That
would be great if there is
transportation to get them home
safely.

Both concepts look like they again have
displaced the people in the mobile
home/trailer parks. A would be better than
B, but really, a brewery next to a college?
That would be great if there is
transportation to get them home safely.
other
Both concepts look like they again
have displaced the people in the
mobile home/trailer parks. A would
be better than B, but really, a
brewery next to a college? That
would be great if there is
transportation to get them home
safely.

Both concepts look like they again have
displaced the people in the mobile
home/trailer parks. A would be better than
B, but really, a brewery next to a college?
That would be great if there is
transportation to get them home safely.

Concept A: Industrial
Flex
Concept A: Industrial
Flex
other
Commercial, Hotel, other revenueproducing uses needed, Focus Area 8 should be extended west, at least
to Wildomar Trail
Expand Focus Area 8 to west, add
commercial, revenue & job generating
services & uses.
other
Focus are 8 should be extended west to
Wildomar trail
Concept A: Industrial
Flex
Concept B: Traditional
Office
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept B: Traditional
Office
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
3647
Concept B: Traditional
Office
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept B: Traditional
Office
Concept B: Traditional
Office
Concept A: Industrial
Flex
Concept A: Industrial
Flex Seems the lesser of the two evils.
other
Affordable housing for students,
seniors, families
Concept B: Traditional
Office
other
High Density Residential with
amenities
Concept B: Traditional
Office
Concept B: Traditional
Office The more upscale the better.

Concept A: Industrial
Flex
Concept B: Traditional
Office
Concept A: Industrial
Flex
Concept A: Industrial
Flex Mostly A, some B
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
other
Concept B: Traditional
Office
3648
Concept A: Industrial
Flex
Concept B: Traditional
Office
other A PARK OR LEAVE AS OPEN SPACE
Concept B: Traditional
Office
Concept B: Traditional
Office
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Clinton keith gets so much traffic including
commuters which would bring in additional
income and businesses.

Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Definitely need to support local small
businesses and encourage more night life
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept B: Traditional
Office
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept B: Traditional
Office
Concept B: Traditional
Office
Concept A: Industrial
Flex
3649
Concept B: Traditional
Office
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept B: Traditional
Office
Concept B: Traditional
Office
other
Neither of unless you're trying to sabotage
the regenerative ag tesearch
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept B: Traditional
Office
Concept A: Industrial
Flex
other
I don't think "industrial-flex" belongs
anywhere in Wildomar!
other
MSJC has developed their Temecula campus
and has openly stated that they are pulling
out of developing the land off of Clinton
Keith... This entire area should be a city
center with a GREAT PARK & event Center
for concerts, etc for the community.

Concept A: Industrial
Flex
Concept A: Industrial
Flex
other Community parks and recreation.
other Mix of A & B Concepts higher traffic and infrastructure concerns Concept A: Industrial
Flex
Concept A: Industrial
Flex
other Rual
Concept A: Industrial
Flex
other Vacant
Concept A: Industrial
Flex
3650
other Mix use
Concept A: Industrial
Flex
Concept B: Traditional
Office
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
I've seen very nice versions of this - but if
you put in junk food places and car repair
shops (for example) things go downhill.

Let's upscale not downscale please.

Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Bad spot for brewery. Need a cultural
indigenous center
Concept A: Industrial
Flex
Concept A: Industrial
Flex
Concept B: Traditional
Office
Concept B: Traditional
Office
3651
Concept A: Industrial
Flex
Concept B: Traditional
Office
Concept B: Traditional
Office
Concept A: Industrial
Flex
No Palm trees. Our area gets lots of wind
and palm trees are hazardous
Concept B: Traditional
Office
Concept B: Traditional
Office
Focus Area 9
Responses Other (Write in Concept) Additional Comments
Concept A: Residential
Concept A: Residential
Concept A: Residential
Concept A: Residential
Concept B: Commercial
Concept A: Residential
other
Mix use- but no fast food or drive
thru
Concept A: Residential
Concept A: Residential
as a resident since 1985, that lives on Union
St, I like the rural area and do not want to
be overwhelmed with commercial space
and what it brings. And again, roads and
signals need to be fixed before anything
Concept B: Commercial
Concept B: Commercial
Concept A: Residential
other Leave it alone
3652
Concept B: Commercial
Concept B: Commercial
Concept B: Commercial
other

BUILD NOTHING AND KEEP
WILDOMAR RURAL!!!!
Concept A: Residential
Concept A: Residential
Concept A: Residential
Concept A: Residential
Concept A: Residential
Concept B: Commercial
Concept B: Commercial
Could use more retail in that area.

Especially a coffee shop and small market.

Concept A: Residential
Concept B: Commercial
Concept A: Residential
Concept A: Residential
Concept B: Commercial
Concept A: Residential
Concept B: Commercial
Concept B: Commercial
Concept B: Commercial
Concept B: Commercial
The brighter lit, the better! This is the
"gateway" to Wildomar's crown jewel,
Mama O'Brian Park!
other
survey neighbors for general plan
and zoning consensus w/in 600 feet
of area 9
3653
other
Concept A: Residential
Concept B: Commercial
Concept B: Commercial
Concept A: Residential
Concept A: Residential
other
Concept A: Residential
Concept A: Residential
You already have single family homes on
larger lots. They Will absolutely oppose
commercial moving in. Keep it residential
with larger lots so someone could own a
horse or 2
other Need traffic and environmental impact
Concept B: Commercial
Concept A: Residential
Concept A: Residential
Concept A: Residential
Concept A: Residential
Concept B: Commercial
Concept A: Residential
Concept B: Commercial
other
Move to the city leave my town
alone
Concept B: Commercial
Concept A: Residential
Concept A: Residential
Concept B: Commercial
3654
Concept B: Commercial
Concept B: Commercial
Concept B: Commercial
Concept A: Residential
Concept B: Commercial
Concept A: Residential
Concept B: Commercial
other Prefer open space and recreation
Concept A: Residential
Concept B: Commercial
Concept B: Commercial
Concept A: Residential
other
Stop build shit until the
infrastructure can handle the
demand!!!
Stop build shit until the infrastructure can
handle the demand!!!
Concept B: Commercial
other Leave rural
Concept B: Commercial
Concept B: Commercial
Concept A: Residential
Concept A: Residential
Concept A: Residential
other Mixed use
Concept B: Commercial
Concept A: Residential
Concept A: Residential
3655
Concept B: Commercial
Concept A: Residential Rural Residential
Concept A: Residential
Concept A: Residential
Concept B: Commercial
Concept B: Commercial
Concept A: Residential
Concept B: Commercial
Concept A: Residential
Concept A: Residential
Concept B: Commercial
Concept B: Commercial
Concept B: Commercial
Concept A: Residential
Concept B: Commercial
Concept B: Commercial
Concept A: Residential
other Leave it as is
Concept A: Residential
Concept A: Residential
Concept A: Residential
other
Concept A: Residential
Concept A: Residential
3656
Concept B: Commercial
Concept A: Residential
Concept A: Residential
Concept A: Residential
Concept A: Residential
Concept A: Residential
Concept A: Residential
Concept B: Commercial
Concept A: Residential
Concept A: Residential
Concept A: Residential
other Leave as is
Concept B: Commercial
Concept A: Residential
Concept B: Commercial
Concept B: Commercial
Concept A: Residential
other
This would be a good question for
the existing residents in the area
This would be a good question for the
existing residents in the area
other
This would be a good question for
the existing residents in the area
This would be a good question for the
existing residents in the area
Concept A: Residential
Concept A: Residential
Concept B: Commercial
Concept A: Residential
Concept A: Residential
3657
Concept B: Commercial
Concept B: Commercial
Concept B: Commercial
Concept A: Residential
Concept B: Commercial
Concept A: Residential
Concept A: Residential
Concept B: Commercial
Concept A: Residential
Concept A: Residential
Concept A: Residential
Concept B: Commercial
Concept A: Residential
Concept A: Residential
Concept B: Commercial
Concept A: Residential
Concept B: Commercial
other Leave us some open bare spaces?
Concept A: Residential
Concept A: Residential
other High density residential mixed use
Concept B: Commercial
Concept B: Commercial
Upscale retail please. No more round ups
and uhaul places.

← All documents from this meeting