Additionally, the SGVCOG VMT Tool28 states that, “For industrial land uses, the tool is best suited for light industrial/R&D uses that have similar employee travel behavior as office uses.” Appendix H: VMT Screening solely utilized the SGVCOG VMT tool for its analysis. The input parameters were not reflective of Project characteristics. For example, only 5,000 sf of total industrial building area was modeled while the Project proposes construction of a 140,720 sf industrial warehouse building. Further, the tool utilized data from the SCAG Regional Travel Demand Model 2016 RTP (Base Year 2012), while the tool’s current data is from the SCAG Regional Travel Demand Model 2024.
28 https://apps.fehrandpeers.com/SGVCOGVMT/
38 cont.
39 33

Page 381 of 9818 ends

The MND has not accurately analyzed the Project’s VMT impacts. Our run of the model utilizing accurate inputs and data sources indicates that the Project will result in 43.53 VMT.

This exceeds the City’s baseline 40.88 VMT and the significance threshold of 15% below baseline (34.75 VMT).

Even utilizing the MND’s chosen software and methodology, the Project results in significant and unavoidable VMT impacts. An EIR must be prepared to include a Project-specific VMT analysis and include a finding of significance due to the Project’s significant and unavoidable VMT impacts.
40 41
34

Page 382 of 9818 ends

Further, the operational nature of industrial/warehouse uses involves high rates of truck/trailer/delivery van VMT due to traveling from large import hubs to regional distribution centers to smaller industrial parks and then to their final delivery destinations. Once employees arrive at work at the proposed Project, they will conduct their jobs by driving delivery vans across the region as part of the daily operations at the warehouse, which will drastically increase Project-generated VMT. The Project’s truck/trailer and delivery van activity is unable to utilize public transit or active transportation, and it is misleading to the public and decision makers to exclude this activity from VMT analysis. The Project’s total operational VMT generated is not consistent with the screening threshold and legislative intent of SB 743 to reduce greenhouse gas emissions by reducing VMT. An EIR must be prepared to reflect a quantified VMT analysis that includes all truck/trailer and delivery van activity and remove the applied VMT exemption.

The MND has not adequately analyzed the Project’s potential to substantially increase hazards due to a geometric design feature (e.g., sharp curves or dangerous intersections) or incompatible uses, or the Project’s potential to result in inadequate emergency access. The MND has not provided any exhibits depicting the available truck/trailer turning radius at the intersection of the Project driveways and the adjacent streets to determine if there is enough space available to accommodate heavy truck maneuvering. There are also no exhibits modeling trucks/trailers maneuvering throughout the entirety of the site. For example, required passenger car parking spaces are located within and immediately adjacent to the gated truck/trailer loading dock court.

These parking stalls that may be in use at any time and further restrict truck/trailer movement, which will also result in increased queuing duration and associated queuing area for trucks/trailer. There is no substantial evidence included to support a less-than-significant finding, and an EIR must be prepared to include a finding of significance. 42 43
35

Page 383 of 9818 ends

The MND also states that, “The Project circulation pattern is subject to City review and approval and thus, will conform with local, state, and federal regulations regarding circulation and traffic pattern design.” The MND does not provide meaningful disclosure and analysis or substantial evidence, such as the City’s requirements/standards and demonstrating how the Project does or does not meet these requirements, to support a less than significant finding. This does not comply with CEQA’s requirements for adequate informational documents and meaningful disclosure (CEQA Guidelines Section 15121 and PRC Section 21003(b)). Deferring this environmental analysis required by CEQA to the construction permitting phase is improper mitigation and does not comply with CEQA’s requirement for meaningful disclosure and adequate informational documents. An EIR must be prepared to include a finding of significance, as the MND has not provided substantial evidence to support a less-than-significant finding.

The MND also provides inadequate analysis of emergency access, stating that “The proposed Project will provide vehicular access via a 40foot-wide driveway on E. Valley Boulevard and a 26-foot-wide driveway on S. 6th Avenue. A 28-foot-wide drive aisle will loop around the building, providing on-site circulation and dedicated fire access. These access features will be designed in compliance with applicable City standards and subject to review and approval by the City. Coordination with the Los Angeles County Fire Department will ensure that appropriate fire protection and emergency response requirements are incorporated into the Project design.

Therefore, the Project would not result in inadequate emergency access, and impacts would be less than significant.” The MND does not provide meaningful evidence or analysis, such as the City standards for emergency vehicles and requirements for accessibility, or Los Angeles County Fire Department requirements for fire protection and emergency response requirements, and demonstrate how the Project does or does not meet these requirements, to support a less-than-significant finding. This does not comply with CEQA’s requirements for adequate informational documents and meaningful disclosure (CEQA Guidelines Section 15121 and PRC Section 21003(b)). Deferring this environmental analysis required by CEQA to the construction permitting phase is improper mitigation and does not comply with CEQA’s requirement for meaningful disclosure and adequate informational documents. An EIR must be prepared to include a finding of significance, as the MND has not provided substantial evidence to support a less-than-significant finding.

XXI. Mandatory Findings of Significance
The MND has not provided an adequate or accurate cumulative analysis discussion here to demonstrate the impact of the proposed Project in a cumulative setting. The MND also does not 44 45
46 36

Page 384 of 9818 ends

provide any information regarding the buildout conditions of the City's General Plan. Table 2:

Land Use Buildout within the General Plan29 indicates that the Employment land use designation will accommodate 91,086,436 square feet of total building area (it is not stated whether this quantity includes all existing development at the baseline date of analysis; the Lead Agency can confirm it includes all existing development). The proposed Project’s 140,720 sf accounts for

0.2% of the total buildout, which will increase as an overall percentage when the total buildout scenario removes the baseline existing quantity of building area. Additionally, APN 8206-027- 080 is located in the unincorporated County of Los Angeles, is outside of the City’s sphere of influence, and requires approval of an Annexation into the City’s boundaries. This increases the total development area for the City, the total Project site area available for development, and the total developable area of the Employment land use designation, and therefore it is not analyzed at all in regional and local plans (including the General Plan) as part of the City of Industry in any form.

The total building area in Table 2 accounting for General Plan buildout increases as other projects are added to the calculation, such as Amar Industry Hills (205,460 sf warehouse and required GPA to from Commercial to Employment), DP 23-0130 (165,537 sf warehouse), and DP 23-0331 (213,500 sf warehouse) combined with the proposed Project will generate 725,217 sf of building area, which is 0.8% of the total buildout, which will increase as an overall percentage when the total buildout scenario removes the baseline existing quantity of building area. An EIR must be prepared to provide an accurate build-out scenario of the City’s General Plan.

The MND excludes from its analysis that the Project site was not anticipated to be developed as proposed, and the site is therefore not accounted for in regional and local plans adopted for purposes of avoiding or mitigating environmental effects, including the AQMP, RTP/SCS, and General Plan. APN 8206-027-080 is located in the unincorporated County of Los Angeles, is outside of the City’s sphere of influence, and requires approval of an Annexation into the City’s boundaries. This increases the total development area for the City and the total Project site area available for development, and therefore, it is not analyzed at all in regional and local plans as part of the City of Industry in any form. Further, Table 1: Land Use Designations within the General Plan Land Use Element32 states that the Employment land use designation has a maximum 0.5 FAR; the site’s Zoning designation also has a maximum 0.5 FAR. The MND’s 29 https://www.cityofindustry.org/home/showpublisheddocument/1693/636422096213600000 30 https://ceqanet.lci.ca.gov/2024080077
31 https://ceqanet.opr.ca.gov/2024070831
32 https://www.cityofindustry.org/DocumentCenter/View/180/General-Plan-PDF 46 cont.
47 48
37

Page 385 of 9818 ends

Project Description states that, “Under the proposed zoning, the maximum allowable Floor Area Ratio (FAR) is 0.5:1, which equates to approximately 136,125 square feet of allowable building area on the 281,705.75 square-foot site.” The Project proposes the construction of a 140,720 square foot industrial warehouse building and is not compliant with the General Plan and Zoning requirements based on the MND’s statement. The site is not accounted for in regional and local plans adopted for purposes of avoiding or mitigating environmental effects, including the AQMP, RTP/SCS, and General Plan. An EIR must also provide a finding of significance as the Project does not comply with the General Plan (and its adopted EIR) AQMP, RTP/SCS, and also therefore impedes local, regional, and statewide abilities to achieve statewide GHG reduction goals.

The MND also does not provide any information regarding the buildout conditions of the City's General Plan. Table 2: Land Use Buildout within the General Plan33 indicates that the Employment land use designation will accommodate 79,211.6 jobs (it is not stated whether this quantity includes all existing jobs at the baseline date of analysis; the Lead Agency can confirm it includes all existing jobs). APN 8206-027-080 is located in the unincorporated County of Los Angeles, is outside of the City’s sphere of influence, and requires approval of an Annexation into the City’s boundaries. This increases the total development area for the City, the total Project site area available for development, and the total developable area of the Employment land use designation, and therefore it is not analyzed at all in regional and local plans (including the General Plan) as part of the City of Industry in any form, including in population and employment forecasts.

SCAG’s Connect SoCal Demographics and Growth Forecast34 notes that the City will add 0 jobs from 2019 to 2050. Utilizing SCAG’s Employment Density Study calculation of 109 employees, the Project vastly exceeds the City’s employment growth projections from 2019 to 2050. This increases exponentially when other commercial and industrial development is considered, such as Amar Industry Hills (464 employees), DP 23-01 (138 employees), and DP 23-03 (152 employees), combined with the proposed Project, will cumulatively generate 863 employees, which exceeds the City’s employment growth forecast over 31 years accounted for by four recent industrial projects. This number increases exponentially when the City’s commercial development activity and other projects since 2019 (SCAG) and 2014 (General Plan) are added to the calculation. An EIR must be prepared to include a cumulative analysis on this 33 https://www.cityofindustry.org/home/showpublisheddocument/1693/636422096213600000 34 SCAG Connect SoCal Demographics and Growth Forecast https://scag.ca.gov/sites/default/files/2024- 05/23-2987-tr-demographics-growth-forecast-final-040424.pdf 48 cont.
49 50
38

Page 386 of 9818 ends

topic in order to provide an adequate and accurate environmental analysis in order to determine the City’s progress towards General Plan and/or SCAG growth forecasts. Additionally, an EIR must provide demographic and geographic information on the location of qualified workers to fill these positions in order to provide an accurate environmental analysis.

The MND states that, “As part of the proposed Project, APN 8206-027-080 will be annexed into the City of Industry, and a General Plan Amendment and Zone Change will be processed to apply the City’s Employment land use designation and Industrial (M) zoning. Upon approval of these entitlements and annexation by the Local Agency Formation Commission (LAFCO), the Project will be fully consistent with the applicable local land use plans and zoning regulations.” The MND has not provided information or analysis regarding the statutory requirements to update a jurisdiction’s sphere of influence and annexation. Government Code Section 56430 et. seq. requires that, “In order to prepare and to update spheres of influence in accordance with Section 56425, the commission shall conduct a service review of the municipal services provided in the county or other appropriate area designated by the commission. The commission shall include in the area designated for service review the county, the region, the subregion, or any other geographic area as is appropriate for an analysis of the service or services to be reviewed and shall prepare a written statement of its determinations with respect to several listed factors.

This analysis document is known as a Municipal Services Review (MSR) and also requires that “…the commission shall comprehensively review all of the agencies that provide the identified service or services within the designated geographic area.” The Los Angeles County LAFCO website does not have an MSR for the City of Industry. Preparation of an MSR is required because the Project proposes to annex APN 8206-027-080, and it is outside of the City’s sphere of influence, necessitating an update to the City’s sphere of influence. The statutorily required MSR has not been included in the MND. An EIR must be prepared to include a finding of significance since the Project does not comply with Government Code Section 56430 et. seq.

Conclusion
For the foregoing reasons, GSEJA believes the MND is flawed, and an EIR must be prepared for the proposed Project and circulated for public review. Golden State Environmental Justice Alliance requests to be added to the public interest list regarding any subsequent environmental documents, public notices, public hearings, and notices of determination for this Project. Send all communications to Golden State Environmental Justice Alliance, P.O. Box 79222, Corona, CA 92877.
50 cont.
51 52
53 39

Page 387 of 9818 ends

Mike Poland
May 22, 2026

Page 23 ends

Sincerely,
Vashon Simien
Blum, Collins & Ho, LLP
Attachments:

1. SWAPE Technical Analysis
40

Page 388 of 9818 ends

2219 Main Street, Suite 600
Santa Monica, CA 90405
Matt Hagemann, P.G, C.Hg.
(949) 887-9013
[email protected]
May 21, 2026
Gary Ho
Blum & Ho LLP
9255 W. Sunset Boulevard, Ste. 810
Los Angeles, CA 90069
Subject: Comments on the CRP IV Valley Center Project (SCH No. 2026050138) Dear Mr. Ho,
We have reviewed the May 2026 Initial Study/Mitigated Negative Declaration (“IS/MND”) for the CRP IV Valley Center Project (“Project”) located in the City of Industry (“City”). The Project proposes to construct a 140,720-square-foot (“SF”) industrial warehouse and 191 parking spaces on the 6.47-acre site.

Our review concludes that the IS/MND fails to adequately evaluate the Project’s air quality and health risk impacts. As a result, emissions and health risk impacts associated with construction and operation of the proposed Project may be underestimated and inadequately addressed. An Environmental Impact Report (“EIR”) should be prepared to adequately assess and mitigate the potential air quality and health risk impacts that the Project may have on the environment.

Air Quality
Unsubstantiated Input Parameters Used to Estimate Project Emissions When reviewing the Project’s CalEEMod output files, provided in the Air Quality and Greenhouse Gas Assessment (“AQ Assessment”) as Appendix A to the IS/MND, we identified several model inputs related to Project construction and operation that are inconsistent with information disclosed in the IS/MND.

The impacts of these changes are quantified in the section of this letter titled “Updated Analysis Indicates a Potentially Significant Air Quality Impact." An EIR should be prepared to include an updated air quality analysis that provides a more detailed evaluation of the impact that construction and operation of the Project may have on local and regional air quality. 8a.
8b.
41

Page 389 of 9818 ends

Unsubstantiated Amount of Required Material Import and Export Review of the CalEEMod output files demonstrates that the “16463 - 6th Street (Proposed)” model includes 680 cubic yards (“cy”) of material export (see screenshot below) (Appendix A, pp. 78).

However, this assumption is unsubstantiated, as the IS/MND fails to specify the maximum amount of soil to be imported or exported from the site whatsoever. As a result, the model may underestimate the amount of material import and export generated by Project construction.

The inclusion of material import and export within the model is required to calculate emissions produced from material movement, including truck loading and unloading, and additional hauling truck trips.1 By potentially underestimating the amount of material import and export required for Project construction, the model underestimates the Project’s construction-related emissions and should not be relied upon to determine Project significance. An EIR should be prepared to provide a detailed grading breakdown and an updated air quality analysis.

Unsubstantiated Changes to Architectural Coating Factors Review of the CalEEMod output files demonstrates that the “16463 - 6th Street (Proposed)” model includes changes to the default architectural coating values (see screenshot below) (Appendix A, pp. 89, 90).
1 “CalEEMod User Guide.” CAPCOA, April 2022, available at: https://www.caleemod.com/documents/user-guide/01_User%20Guide.pdf, p. 36, 38. 8b.
cont.
42

Page 390 of 9818 ends

The CalEEMod User’s Guide requires any changes to model defaults be justified.2 As demonstrated above in the “User Changes to Default Data” table, the justification provided for these changes is:
“SCAQMD Rule 1113” (Appendix A, pp. 89, 90).

These changes remain unsupported, as the IS/MND does not directly mandate adherence to Rule 1113 or the use of low volatile organic compound (“VOC”) paints through a formal mitigation measure.

According to the Association of Environmental Professionals (“AEP”) CEQA Portal Topic Paper on mitigation measures:
“While not ‘mitigation’, a good practice is to include those project design feature(s) that address environmental impacts in the mitigation monitoring and reporting program (MMRP). Often the MMRP is all that accompanies building and construction plans through the permit process. If the design features are not listed as important to addressing an environmental impact, it is easy for someone not involved in the original environmental process to approve a change to the project that could eliminate one or more of the design features without understanding the resulting environmental impact.”3
Without the formal inclusion as a mitigation measure, the use of low VOC coatings in compliance with Rule 1113 may be entirely omitted from the Project's design. As the IS/MND does not formally commit to implementing, monitoring, or enforcing the use of these coatings, the changes in the model are unfounded.

These reductions present an issue, as CalEEMod uses the architectural coating emission factors to calculate the Project’s VOC, also known as reactive organic gas (“ROG”), emissions.4 By including unsupported reductions to the default architectural coating emission factors, the model may underestimate the Project’s construction-related VOC/ROG emissions and should not be relied upon to determine Project significance.

Incorrect Construction Hauling Trip Length
Review of the CalEEMod output files demonstrates that the “16463 - 6th Street (Proposed)” model includes the default 20-mile hauling trip length (see screenshot below) (Appendix A, pp. 77). 2 “CalEEMod User Guide.” CAPCOA, April 2022, available at: https://www.caleemod.com/documents/user-guide/01_User%20Guide.pdf, p. 13, 14. 3 “CEQA Portal Topic Paper Mitigation Measures.” AEP, 2025, available at:
https://ceqaportal.org/downloadtp.cfm?file=CEQA+Mitigation_2025+Update.pdf&token=6DCD87B3-CE3F-C7FA-159B26B39185CF33, p. 6, (membership required). 4 “CalEEMod User Guide.” CAPCOA, April 2022, available at: https://www.caleemod.com/documents/user-guide/01_User%20Guide.pdf, p. 7, 44. 8b.
cont.
43

Page 391 of 9818 ends

In regard to the landfill to be used by the Project and consequent hauling trip length, the AQ Assessment states:
“Based on information provided by the client, grading materials will be hauled off-site to the El Sobrante Landfill, located 43 miles from the Project site. As such, a trip length of 43-miles was used to analyze the emissions associated with export activities” (Appendix A, p. 9).

As indicated above, the AQ Assessment claims to use a 43-mile hauling trip length, but the model was not adjusted accordingly. The 20-mile hauling trip route is therefore underestimated by 23 miles.

CalEEMod uses the hauling trips lengths to estimate the construction-related emissions associated with on-road vehicles.5 By including an underestimated hauling trip length, the model underestimates the Project’s construction-related emissions and should not be relied upon to determine Project significance.

Unsubstantiated Changes to Operational Energy Use Values Review of the CalEEMod output files demonstrates that the “16463 - 6th Street (Proposed)” model includes changes to the default energy use values (see screenshot below) (Appendix A, pp. 89, 90). 5 “CalEEMod User Guide.” CAPCOA, April 2022, available at: https://www.caleemod.com/documents/user-guide/01_User%20Guide.pdf, p. 13, 14. 8b.
cont.
44

Page 392 of 9818 ends

As previously mentioned, the CalEEMod User’s Guide requires any changes to model defaults be justified.6 The justifications provided for these changes are:
“Natural gas was not assumed” (Appendix A, pp. 90).

In regard to the Project’s natural gas usage, the IS/MND states:
“Natural gas would be utilized for heating, hot water, and HVAC systems, contributing to the Project’s operational energy consumption” (p. 45).

The assumption that the Project would not use natural gas in the model is thus incorrect, as the IS/MND directly indicates that natural gas would be used during Project operations.

The energy use values are used by CalEEMod to calculate the Project’s emissions associated with building electricity and natural gas usage. 7 By incorrectly assuming that the Project would not use natural gas, the model underestimates the Project’s operational emissions and should not be relied upon to determine Project significance.

Updated Analysis Indicates a Potentially Significant Air Quality Impact To more accurately estimate the Project’s construction-related emissions, we prepared a construction CalEEMod model, using the Project-specific information provided by the IS/MND. We increased the construction hauling trip length to 43 miles and excluded the unsubstantiated changes to the architectural coating factors. All other inputs remain consistent with the IS/MND’s model.

Our updated analysis estimates that the Project’s construction-related VOC emissions exceed the South Coast Air Quality Management District (“SCAQMD”) daily threshold of 75 pounds per day (“lbs/day”) below).
6 “CalEEMod User Guide.” CAPCOA, April 2022, available at: https://www.caleemod.com/documents/user-guide/01_User%20Guide.pdf, p. 13, 14. 7 “CalEEMod User Guide.” CAPCOA, April 2022, available at: https://www.caleemod.com/documents/user-guide/01_User%20Guide.pdf, p. 43. 8b.
cont.
8c.
45

Page 393 of 9818 ends

SWAPE Criteria Air Pollutant Emissions Estimates
Construction VOC
(lbs/day)
IS/MND 43.4
SWAPE 81.95
SCAQMD Threshold 75
Exceeds? Yes
According to our analysis, the construction-related VOC emissions are estimated to be approximately

81.95 lbs/day, exceeding the SCAQMD daily threshold. This finding indicates a potentially significant air quality impact that the IS/MND did not identify or address. In our opinion, an EIR should be conducted to provide a more accurate evaluation of the potential air quality impact from the Project on the environment and mitigate significant impacts accordingly.

Disproportionate Health Risk Impacts of Warehouses on Surrounding Communities Our review concludes that the IS/MND fails to adequately evaluate the Project’s health risk impacts. The development of the proposed Project may contribute to the disproportionate health risk impact that warehouses already pose on community members living, working, and going to school within the immediate area of the Project site. According to the SCAQMD, communities of color living within a half mile of warehouses face higher health risks, including increased rates of asthma and heart attacks, along with a greater environmental burden.8
Specifically, the SCAQMD found that more than 2.4 million people live within a half mile radius of at least one warehouse, and that those areas not only experience increased rates of asthma and heart attacks, but are also disproportionately Black and Latino communities below the poverty line.9 Another study indicates “neighborhoods with lower household income levels and higher percentages of minorities are expected to have higher probabilities of containing warehousing facilities.”10 Furthermore, a report authored by the Inland Empire-based People’s Collective for Environmental Justice and University of Redlands explains that the warehouse and logistics industry is expanding rapidly, with many new projects being built in low-income communities of color. These projects attract high volumes of polluting truck traffic, which emits harmful nitrogen oxide and particulate matter, contributing to severe health issues like asthma, COPD, cancer, and premature death.11 Despite these 8 “South Coast AQMD Governing Board Adopts Warehouse Indirect Source Rule.” SCAQMD, May 2021, available at: http://www.aqmd.gov/docs/default-source/news-archive/2021/board-adopts-waisr-may7-2021.pdf?sfvrsn=9. 9 “Southern California warehouse boom a huge source of pollution. Regulators are fighting back.” Los Angeles Times, May 2021, available at: https://www.latimes.com/california/story/2021-05-05/air-quality-officials-target-warehouses-bid-to-curb-health-damaging-truck-pollution. 10 “Location of warehouses and environmental justice: Evidence from four metros in California.” Metro Freight Center of Excellence, January 2018, available at:
https://www.metrans.org/assets/research/MF%201.1g_Location%20of%20warehouses%20and%20environmental %20justice_Final%20Report_021618.pdf, p. 21. 11 “Warehouses, Pollution, and Social Disparities: An analytical view of the logistics industry’s impacts 8c.
cont.
8d.
46

Page 394 of 9818 ends

10 to 25 million square feet of new industrial space annually.12 When using CalEnviroScreen 4.0, CalEPA’s screening tool that ranks each census tract in the State for pollution and socioeconomic vulnerability, we found that the Project’s census tract is in the 92nd percentile of most polluted census tracts in the State (see screenshot below).13 The Data Visualization Tool for Mates V, a monitoring and evaluation study conducted by SCAQMD, demonstrates that the County already exhibits a heightened residential carcinogenic risk from exposure on environmental justice communities across Southern California.” People’s Collective for Environmental Justice, April 2021, available at:
https://earthjustice.org/sites/default/files/files/warehouse_research_report_4.15.2021.pdf, p. 4. 12 “2020 North America Industrial Big Box Review & Outlook.” CBRE, 2020, available at: https://www.cbre.com/- /media/project/cbre/shared-site/insights/local-responses/industrial-big-box-report-inland-empire/local-response-2020-ibb-inland-empire-overview.pdf, p. 2. 13 “CalEnviroScreen 4.0.” OEHHA, October 2021, available at:
https://experience.arcgis.com/experience/11d2f52282a54ceebcac7428e6184203/page/CalEnviroScreen-4_0. 8d.
cont.
47

Page 395 of 9818 ends

in the South Coast Air Basin (“SCAB”), with a cancer risk of 531 in one million (see screenshot below).15 Additionally, according to CalEnviroScreen’s Senate Bill (“SB”) 535 Disadvantaged Communities Map, the Project site is identified as a designated disadvantaged community (see screenshot below).16 14 “Residential Air Toxics Cancer Risk Calculated from Model Data in Grid Cells.” MATES V, 2018, available at:
https://experience.arcgis.com/experience/79d3b6304912414bb21ebdde80100b23/page/Main-Page/?views=Click-tabs-for-other-data%2CGridded-Cancer-Risk; see also: “MATES V Multiple Air Toxics Exposure Study.” SCAQMD, available at: http://www.aqmd.gov/home/air-quality/air-quality-studies/health-studies/mates-v. 15 “Gridded Cancer Risk.” SCAQMD, available at:
https://experience.arcgis.com/experience/79d3b6304912414bb21ebdde80100b23/page/Main-Page/?data_id=dataSource_112-7c8f2a4db79b4a918d46b4e8985a112b%3A20315&views=Click-tabs-for-other-data%2CGridded-Cancer-Risk. 16 “SB 535 Disadvantaged Communities (2022 Update).” California Environmental Protection Agency, available at:
https://experience.arcgis.com/experience/1c21c53da8de48f1b946f3402fbae55c/page/SB-535-Disadvantaged-Communities/ 8d.
cont.
48

Page 396 of 9818 ends

SB 535 provides funding for development projects that provide a benefit to disadvantaged communities.

CalEPA has been given the responsibility for identifying those communities based on “geographic, socioeconomic, public health, and environmental hazard criteria.”17 The Project may therefore worsen disproportionate health risks for community members within the immediate area, a concern underscored by the mandates of SB 1000. SB 1000, enacted to address environmental justice concerns, requires local governments to integrate environmental justice elements into their planning processes, particularly focusing on reducing health risks for disadvantaged communities.18 As the IS/MND indicates that the proposed Project site is located approximately 783 feet, or 239 meters from residential receptors, the Project should comply with the objectives of SB 1000 (p. 31).

In accordance with the California Department of Justice (“CA DOJ”) guidelines, the effects of greenhouse gas emissions and air pollutants from warehouses should be evaluated cumulatively. The CA DOJ states that cumulative impacts should be evaluated by considering the project's incremental effects alongside past, present, and future projects, even if the project alone does not exceed significance thresholds.19 To more adequately assess the Project’s impact on disadvantaged communities, both existing and future warehouse developments should be considered during the environmental review process.
17 “Final Designation of Disadvantaged Communities.” CalEPA, available at: https://calepa.ca.gov/wp-content/uploads/2022/05/Updated-Disadvantaged-Communities-Designation-DAC-May-2022-Eng.a.hp_-1.pdf, p.

1. 18 “Environmental Justice in Local Land Use Planning.” CA DOJ, available at:
https://oag.ca.gov/environment/sb1000. 19 “Warehouse Projects: Best Practices and Mitigation Measures to Comply with the California Environmental Quality Act.” CA DOJ, available at: https://oag.ca.gov/sites/all/files/agweb/pdfs/environment/warehouse-best-practices.pdf, p. 6. 8d.
cont.
49

Page 397 of 9818 ends

As the Project site is in an SB 535 disadvantaged community that experiences disproportionately high levels of pollution, we recommend the IS/MND reevaluate the Project's cumulative health risks to more sufficiently align with CA DOJ guidelines and SB 1000 environmental justice requirements.

Lastly, the Warehouse Cumulative Impact Tool for Community dashboard (“Warehouse CITY”), developed by the Redford Conservancy at Pitzer College and Radical Research LLC, is a tool that visualizes and quantifies existing, potential, and approved warehouse locations across Southern California. Review of Warehouse CITY reveals that there are 418 existing warehouses currently in Industry, 5 more that have been approved, and 1 that is currently under CEQA review (see screenshot below).20
The presence of numerous existing warehouses in the City underscores the need to reassess the Project's cumulative health risks pursuant to CA DOJ guidelines and SB 1000 environmental justice requirements.

Diesel Particulate Matter Emissions Inadequately Evaluated The IS/MND claims a less-than-significant health risk impact without conducting a quantified construction and operational health risk assessment (“HRA”). In regard to the Project’s potential to expose sensitive receptors to substantial pollutant concentrations, the IS/MND states:
“As explained in Section III (b) above, construction and operational emissions would not exceed the applicable SCAQMD Localized Significant Thresholds (LSTs) for any criteria pollutant.

Sensitive receptors in the vicinity of the Project site would not be exposed to substantial pollutant concentrations in violation of SCAQMD LSTs during construction or operation of the 20 “Warehouse and Air Quality Mapping.” Pitzer College & Radical Research LLC, available at:
https://radicalresearch.shinyapps.io/WarehouseCITY/.
8d.
cont.
8e.
50

Page 398 of 9818 ends

proposed Project. As the proposed Project will not cause or contribute to an exceedance of the most stringent applicable federal or state ambient air quality standard identified by SCAQMD at the nearest residence or sensitive receptor, impacts would be less than significant” (p. 36) The IS/MND’s failure to evaluate the Project’s potential health risk impacts is unsupported for two reasons.

The use of a LST analysis to determine the health risk impacts posed to nearby, existing sensitive receptors as a result of the Project’s construction toxic air contaminant (“TAC”) emissions is incorrect.

While the LST method assesses the impact of pollutants at a local level, it only evaluates impacts from criteria air pollutants. According to the Final Localized Significance Threshold Methodology document prepared by SCAQMD, LST analyses are only applicable to NOx, CO, PM10, and PM2.5 emissions, which are collectively referred to as criteria air pollutants.21 Because LST methods can only be applied to criteria air pollutants, they cannot be used to determine whether emissions from TACs, specifically diesel particulate matter (“DPM”), a known human carcinogen, would result in a significant health risk impact to nearby sensitive receptors. As a result, health impacts during Project construction from exposure to TACs, such as DPM, were not analyzed, therefore leaving a gap in the IS/MND’s analysis.

Second, by failing to prepare a quantified construction and operational HRA, the IS/MND is thus inconsistent with CEQA’s requirement to correlate the increase in emissions generated by the Project to the adverse impacts on human health caused by those emissions. Under CEQA, agencies must make a “reasonable effort to substantively connect a project’s air quality impacts to likely health consequences.”22 The IS/MND also fails to align with the CA DOJ guidelines for warehouse best practices, which recommends that all potential warehouse projects prepare a quantitative HRA in accordance with the Office of Environmental Health Hazard Assessment (“OEHHA”), the organization responsible for providing guidance on conducting HRAs in California.23 To comply with these requirements, an HRA should have been prepared to assess the potential health risks to nearby sensitive receptors from DPM emissions generated during construction and operation. The sum of the Project’s construction and operational cancer risk estimates should then be compared to the SCAQMD threshold of 10 in one million.24
21 “Final Localized Significance Threshold Methodology.” South Coast Air Quality Management District (SCAQMD), Revised July 2008, available at: http://www.aqmd.gov/docs/default-source/ceqa/handbook/localized-significance-thresholds/final-lst-methodology-document.pdf. 22 “Sierra Club v. County of Fresno.” Supreme Court of California, December 2018, available at:
https://law.justia.com/cases/california/supreme-court/2018/s219783a.html 23 “Warehouse Projects: Best Practices and Mitigation Measures to Comply with the California Environmental Quality Act.” CA DOJ, available at: https://oag.ca.gov/sites/all/files/agweb/pdfs/environment/warehouse-best-practices.pdf, p. 6. 24 “South Coast AQMD Air Quality Significance Thresholds.” SCAQMD, March 2023, available at:
https://www.aqmd.gov/docs/default-source/ceqa/handbook/south-coast-aqmd-air-quality-significance-thresholds.pdf?sfvrsn=25. 8e.
cont.
51

Page 399 of 9818 ends

Screening-Level Analysis Demonstrates Potentially Significant Health Risk Impact We conducted a screening-level risk assessment using AERSCREEN, a screening-level air quality dispersion model which uses a limited amount of site-specific information to generate maximum reasonable downwind concentrations of air contaminants to which nearby sensitive receptors may be exposed.25 We prepared a preliminary HRA of the Project’s construction and operational health risk impacts health risk impact to residential sensitive receptors using the annual PM10 exhaust estimates from the IS/MND’s CalEEMod output files. Consistent with recommendations set forth by the OEHHA, we assumed residential exposure begins during the third trimester stage of life.26 The “16463 - 6th Street (Proposed)” model indicates that construction activities will generate approximately 102 pounds of DPM over the 332-day construction period.27 The AERSCREEN model relies on a continuous average emission rate to simulate maximum downward concentrations from point, area, and volume emission sources. To account for the variability in equipment usage and truck trips over construction of the Project, we calculated an average DPM emission rate by the following equation:
𝑔𝑔𝑔𝑔𝑔𝑔𝑔𝑔𝑔𝑔𝑔𝑔𝑔𝑔𝑔𝑔𝑔𝑔𝑔𝑔 101.7 𝑙𝑙𝑙𝑙𝑙𝑙𝑙𝑙 �� 453.6 𝑔𝑔𝑔𝑔𝑔𝑔𝑔𝑔𝑔𝑔𝑔𝑔𝑔𝑔𝑔𝑔𝑔𝑔𝑔𝑔 1 𝑠𝑠𝑠𝑠 𝑠𝑠𝑠𝑠 1 ℎ 𝑜𝑜𝑜𝑜𝑔𝑔𝑔𝑔 � 𝑠𝑠𝑠𝑠 𝑠𝑠𝑠𝑠� = ×
332 𝑠𝑠𝑠𝑠 𝑠𝑠𝑠𝑠
× × = 𝟎𝟎𝟎𝟎. 𝟎𝟎𝟎𝟎𝟎𝟎𝟎𝟎𝟎𝟎𝟎𝟎𝟎𝟎𝟎𝟎𝟎𝟎𝟎𝟎𝒈𝒈𝒈𝒈/𝒔𝒔𝒔𝒔
𝑙𝑙𝑙𝑙𝑙𝑙𝑙𝑙 24 ℎ 𝑜𝑜𝑜𝑜𝑔𝑔𝑔𝑔 3,600 𝑠𝑠𝑠𝑠 𝑠𝑠𝑠𝑠
Using this equation, we estimated a construction emission rate of 0.00161 grams per second (“g/s”).

Subtracting the 332-day construction period from the total duration of 30 years, we assumed that after Project construction, the sensitive receptor would be exposed to the Project’s operational DPM for an additional 29 years. The IS/MND’s operational CalEEMod emissions indicate that operational activities will generate approximately 40 pounds of DPM per year during operation. Applying the same equation used to estimate the construction DPM rate, we estimated the following emission rate for Project operation:
grams 40.0 lbs 453.6 grams 1 day 1 hour
EmissionRate �second� = ×
365 days
× × = 𝟎𝟎𝟎𝟎. 𝟎𝟎𝟎𝟎𝟎𝟎𝟎𝟎𝟎𝟎𝟎𝟎𝟎𝟎𝟎𝟎𝟎𝟎𝟎𝟎𝟎𝟎𝟎𝟎𝐠𝐠𝐠𝐠/𝐬𝐬𝐬𝐬
lbs 24 hours 3,600 seconds
We estimated an operational emission rate of 0.000575 g/s. Construction and operation were simulated as a 1.5-acre rectangular area source in AERSCREEN, with approximate dimensions of 229- by 114- meters. A release height of three meters was selected to represent the height of stacks of operational equipment and other heavy-duty vehicles, and an initial vertical dimension of one and a half meters was used to simulate instantaneous plume dispersion upon release. An urban meteorological setting was selected with model-default inputs for wind speed and direction distribution. The population of Industry was obtained from U.S. 2024 Census data.28
25 “Air Quality Dispersion Modeling - Screening Models,” U.S. EPA, available at: https://www.epa.gov/scram/air-quality-dispersion-modeling-screening-models. 26 “Risk Assessment Guidelines Guidance Manual for Preparation of Health Risk Assessments.” OEHHA, February 2015, available at: https://oehha.ca.gov/media/downloads/crnr/2015guidancemanual.pdf, p. 8-18. 27 See Attachment B for health risk calculations. 28 “Menifee.” U.S. Census Bureau, 2024, available at:
https://datacommons.org/place/geoId/0646842?q=Menifee%2C+CA%2C+USA. 8f.
52

Page 400 of 9818 ends

The AESCREEN model generates maximum reasonable estimates of single-hour DPM concentrations for the Project. The U.S. Environmental Protection Agency (“U.S. EPA”) suggests that the annualized average concentration of an air pollutant be estimated by multiplying the single-hour concentration by 10% in screening procedures.29 The IS/MND states that the closest known sensitive receptors include single-family residences that are as close as 783 feet, or 239 meters to the Project site (p. 31).

The single-hour concentration estimated by AERSCREEN for construction of the Project is approximately

1.387 µg/m3 DPM at approximately 250 meters downwind. Multiplying this single-hour concentration by 10%, we get an annualized average concentration of 0.1387 µg/m3 for Project construction.30 For Project operation, the single-hour concentration estimated by AERSCREEN is 0.4958 µg/m3 DPM at approximately 250 meters downwind. Multiplying this single-hour concentration by 10%, we get an annualized average concentration of 0.04958 µg/m3 for Project operation.31 We calculated the excess cancer risk to the annualized average concentration using applicable HRA methodologies prescribed by OEHHA, as recommended by SCAQMD. Guidance from OEHHA and California Air Resources Board (“CARB”) recommends the use of a standard point estimate approach, including high-point estimate (i.e. 95th percentile) breathing rates and age sensitivity factors to account for the increased sensitivity to carcinogens during early-in-life exposure and accurately assess risk for susceptible subpopulations such as children. The residential exposure parameters used for the various age groups in our screening-level HRA are as follows:
29 “Screening Procedures for Estimating the Air Quality Impact of Stationary Sources Revised.” U.S. EPA, October 1992, available at: https://www.epa.gov/sites/default/files/2020-09/documents/epa-454r-92-019_ocr.pdf. 30 See Attachment C for AERSCREEN outputfiles. 31 See Attachment D for AERSCREEN outputfiles. 8f. cont.
53

Page 401 of 9818 ends

Exposure Assumptions for Residential Individual Cancer Risk Age Group
Breathing
Rate
(L/kg-day)32
Age
Sensitivity
Factor33
Exposure
Duration
(years)
Fraction of
Time at
Home34
Exposure
Frequency
(days/year)35
Exposure
Time
(hours/day)
3rd Trimester 361 10 0.25 1 350 24
Infant (0 – 2) 1090 10 2 1 350 24
Child (2 – 16) 572 3 14 1 350 24
Adult (16 – 30) 261 1 14 0.73 350 24
For the inhalation pathway, the procedure requires the incorporation of several discrete variates to effectively quantify doses for each age group. Once determined, contaminant dose is multiplied by the cancer potency factor (“CPF”) in units of inverse dose expressed in milligrams per kilogram per day (mg/kg/day-1) to derive the cancer risk estimate. We used the following dose algorithm, therefore, to assess exposures:

𝐷𝐷𝐷𝐷 𝐴𝐴𝐴𝐴𝐴𝐴𝐴𝐴𝐴𝐴𝐴𝐴,𝑝𝑝𝑝𝑝𝑝𝑝𝑝𝑝𝑝𝑝𝑝𝑝 𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑝𝑝𝑝𝑝 𝑎𝑎𝑎𝑎𝑝𝑝𝑝𝑝𝑔𝑔𝑔𝑔𝑔𝑔𝑔𝑔𝑝𝑝𝑝𝑝 = 𝐶𝐶𝐶𝐶𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑎𝑝𝑝𝑝𝑝 × × �𝐵𝐵𝐵𝐵 �× 𝐴𝐴𝐴𝐴 × 𝐶𝐶𝐶𝐶 𝐵𝐵𝐵𝐵𝐵𝐵𝐵𝐵
where:

DoseAIR = dose by inhalation (mg/kg/day), per age group Cair = concentration of contaminant in air (μg/m3)
EF = exposure frequency (number of days/365 days)
BR/BW = daily breathing rate normalized to body weight (L/kg/day) A = inhalation absorption factor (default = 1)
CF = conversion factor (1x10-6, μg to mg, L to m3)
We then used the following equation for each appropriate age group to calculate the overall cancer risk:
32 “Supplemental Guidelines for Preparing Risk Assessments for the Air Toxics ‘Hot Spots’ Information and Assessment Act.” SCAQMD, October 2020, available at: http://www.aqmd.gov/docs/default-source/planning/risk-assessment/ab-2588-supplemental-guidelines.pdf?sfvrsn=19, p. 19; see also “Risk Assessment Guidelines Guidance Manual for Preparation of Health Risk Assessments.” OEHHA, February 2015, available at:
https://oehha.ca.gov/media/downloads/crnr/2015guidancemanual.pdf. 33 “Risk Assessment Guidelines Guidance Manual for Preparation of Health Risk Assessments.” OEHHA, February 2015, available at: https://oehha.ca.gov/media/downloads/crnr/2015guidancemanual.pdf, p. 8-5 Table 8.3. 34 “Risk Assessment Procedures.” SCAQMD, August 2017, available at: http://www.aqmd.gov/docs/default-source/rule-book/Proposed-Rules/1401/riskassessmentprocedures_2017_080717.pdf, p. 7. 35 “Risk Assessment Guidelines Guidance Manual for Preparation of Health Risk Assessments.” OEHHA, February 2015, available at: https://oehha.ca.gov/media/downloads/crnr/2015guidancemanual.pdf, p. 5-24. 8f. cont.
54

Page 402 of 9818 ends

𝐶𝐶𝐶𝐶 𝐴𝐴𝐴𝐴𝐴𝐴𝐴𝐴𝐴𝐴𝐴𝐴= 𝐷𝐷𝐷𝐷 𝐴𝐴𝐴𝐴𝐴𝐴𝐴𝐴𝐴𝐴𝐴𝐴 × 𝐶𝐶𝐶𝐶𝐶𝐶𝐶𝐶 × 𝐴𝐴𝐴𝐴𝐴𝐴𝐴𝐴 × 𝐸𝐸𝐸𝐸 × 𝐴𝐴𝐴𝐴𝐴𝐴𝐴𝐴 where:

DoseAIR = do.se by inhalation (mg/kg/day), per age group CPF = cancer potency factor, chemical-specific(mg/kg/day)-1 ASF = age sensitivity factor, per age group
FAH = fraction of time at home, per age group (for residential receptors only) ED = exposure duration (years)
AT = averaging time period over which exposure duration is averaged (always 70 years) Consistent with the 332-day construction schedule, the annualized average concentration for construction was used for the entire third trimester of pregnancy (0.25 years) and the first 0.66 years of the infantile stage of life (0-2 years). The annual annualized average concentration for operation was used for the remainder of the 30-year exposure period, which makes up the latter 1.34 years of the infantile stage of life, as well as the entire child (2 – 16 years) and adult (16 – 30 years) stages of life. The results of our calculations are shown in the table below.

The Maximally Exposed Individual at an Existing Residential Receptor Age Group Emissions Source Duration (years) Concentration (ug/m3) Cancer Risk
3rd Trimester Construction 0.25 0.1387 1.89E-06
Construction 0.66 0.1387 1.50E-05
Operation 1.34 0.0496 1.09E-05
Infant (0 - 2) Total 2 2.59E-05
Child (2 - 16) Operation 14 0.0496 1.79E-05
Adult (16 - 30) Operation 14 0.0496 1.99E-06
Lifetime 30 4.78E-05
The excess cancer risks for the 3rd trimester of pregnancy, infants, children, and adults at the nearest sensitive receptor located approximately 250 meters away, over the course of Project construction and operation, are approximately 1.89, 25.9, 17.9, and 1.99 in one million, respectively. The excess cancer risk over the course of the receptor lifetime (30 years) is approximately 47.8 in one million. The infant, child, and lifetime cancer risks exceed the SCAQMD’s threshold of 10 in one million, resulting in a potentially significant impact not addressed or identified by the IS/MND or associated documents. 8f. cont.
55

Page 403 of 9818 ends

Our analysis represents a screening-level HRA, which is known to be conservative. The purpose of the screening-level HRA is to demonstrate the potential link between project-generated emissions and adverse health risk impacts. The U.S. EPA Exposure Assessment Guidelines suggest an iterative, tiered approach to exposure assessments, starting with a simple screening-level evaluation using basic tools and conservative assumptions.36 If a screening-level analysis exceeds thresholds, a more refined analyses with advanced models and detailed input data should follow.

Our screening-level HRA demonstrates that construction and operation of the Project could result in a potentially significant health risk impact. An EIR should therefore be prepared to include a refined HRA, as recommended by the U.S. EPA. If the refined analysis similarly reaches a determination of significant impact, then mitigation measures should be incorporated, as described in our “Feasible Mitigation Measures Available to Reduce Emissions” section below.

Mitigation
Feasible Mitigation Measures Available to Reduce Emissions The IS/MND is required under CEQA to implement all feasible mitigation to reduce the Project’s potential impacts. As demonstrated above, the Project would result in potentially significant air quality and health risk impacts that should be mitigated further.

To reduce the VOC emissions associated with Project construction we recommend the IS/MND consider incorporating the following mitigation measures: 37,38
• Use super-compliant VOC-content architectural coatings (0 grams per liter to less than 10 grams per liter VOC) during Project construction application of paints and other architectural coatings. • If paints and coatings with VOC content of 0 grams/liter to less than 10 grams/liter cannot be utilized, or they do not reduce emissions to below thresholds, the developer shall avoid application of architectural coatings during the peak smog season: July, August, and September.

Further mitigation used by other land use development projects to address VOC emissions is as follows:39
• Recycle leftover paint. Take any leftover paint to a hazardous waste center; do not mix leftover water-based and oil-based paints.
36 “Exposure Assessment Tools by Tiers and Types - Screening-Level and Refined.” U.S. EPA, May 2024, available at:
https://www.epa.gov/expobox/exposure-assessment-tools-tiers-and-types-screening-level-and-refined. 37 “Warehouse Projects: Best Practices and Mitigation Measures to Comply with the California Environmental Quality Act.” State of California Department of Justice, September 2022, available at:
https://oag.ca.gov/system/files/media/warehouse-best-practices.pdf, p. 8 – 10. 38 “Mitigation Monitoring and Reporting Program.” Los Angeles County Housing Element Update Program EIR.

August 2021, available at: https://planning.lacounty.gov/wp-content/uploads/2023/07/Housing_final-peir-mitigation-monitoring.pdf. 39 “Banning Commerce Center Project.” Kimley-Horn and Associates, Inc., June 2024, available at:
https://ceqanet.opr.ca.gov/2022090102/2; Draft Environmental Impact Report, p. 1-7. 8f. cont.
8g.
56

Page 404 of 9818 ends

• Keep lids closed on all paint containers when not in use to prevent VOC emissions and excessive odors.
• For water-based paints, clean up with water only. Whenever possible, do not rinse the cleanup water down the drain or pour it directly into the ground or the storm drain • Use compliant low-VOC cleaning solvents to clean paint application equipment. • Keep all paint- and solvent-laden rags in sealed containers to prevent VOC emissions. • Contractors shall construct/build with materials that do not require painting and use pre-painted construction materials to the extent practicable. • Use high-pressure/low-volume paint applicators with a minimum transfer efficiency of at least 50 percent or other application techniques with equivalent or higher transferefficiency.

If a refined HRA finds that the Project would result in a potentially significant health risk impact, the IS/MND should incorporate mitigation to reduce emissions to the maximum extent feasible. In order to reduce the DPM emissions associated with Project construction and operation, the CARB and the CA DOJ recommend:40, 41
• Ensure the cleanest possible construction practices and equipment are used. This includes eliminating the idling of diesel-powered equipment and providing the necessary infrastructure (e.g., electrical hookups) to support zero and near-zero equipment and tools. • Implement, and plan accordingly for, the necessary infrastructure to support the zero and near-zero emission technology vehicles and equipment that will be operating on site. Necessary infrastructure may include the physical (e.g., needed footprint), energy, and fueling infrastructure for construction equipment, on-site vehicles and equipment, and medium-heavy and heavy-heavy duty trucks.
• Require all off-road diesel-powered equipment used during construction to be equipped with Tier 4 or cleaner engines, except for specialized construction equipment in which Tier 4 engines are not available. In place of Tier 4 engines, off-road equipment can incorporate retrofits, such that, emission reductions achieved are equal to or exceed that of a Tier 4 engine. • Require all off-road equipment with a power rating below 19 kilowatts (e.g., plate compactors, pressure washers) used during project construction be battery powered. • Require all heavy-duty trucks entering the construction site during the grading and building construction phases be model year 2014 or later. All heavy-duty haul trucks should also meet CARB’s lowest optional low-oxides of nitrogen (NOx) standard starting in the year2022. • Require all construction equipment and fleets to be in compliance with all current air quality regulations.
40 “Recommended Air Pollution Emission Reduction Measures for Warehouses and Distribution Centers.” CARB, August 2023, available at: https://ww2.arb.ca.gov/sites/default/files/2023-08/CARB%20Comments%20- %20NOP%20for%20the%20%20Oak%20Valley%20North%20Project%20DEIR.pdf; Attachment A, p. 5 – 8. 41 “Warehouse Projects: Best Practices and Mitigation Measures to Comply with the California Environmental Quality Act.” State of California Department of Justice, September 2022, available at:
https://oag.ca.gov/system/files/media/warehouse-best-practices.pdf, p. 8 – 10. 8g.
cont.
57

Page 405 of 9818 ends

• Require tenants to use the cleanest technologies available, and to provide the necessary infrastructure to support zero-emission vehicles and equipment that will be operating on site. • Require all loading/unloading docks and trailer spaces be equipped with electrical hookups for trucks with transport refrigeration units (TRU) or auxiliary power units. • Requiring all TRUs entering the project-site be plug-in capable. • Requiring all service equipment (e.g., yard hostlers, yard equipment, forklifts, and pallet jacks) used within the project site to be zero-emission. This equipment is widely available and can be purchased using incentive funding from CARB’s Clean Off-Road Equipment Voucher Incentive Project (CORE).
• Require future tenants to exclusively use zero-emission light and medium-duty delivery trucks and vans.
• Require all heavy-duty trucks entering or on the project site to be zero-emission vehicles, and be fully zero-emission. A list of commercially available zero-emission trucks can be obtained from the Hybrid and Zero-emission Truck and Bus Voucher Incentive Project (HVIP). Additional incentive funds can be obtained from the Carl Moyer Program and Voucher IncentiveProgram. • Restrict trucks and support equipment from idling longer than two minutes while on site. • Require the installation of vegetative walls or other effective barriers that separate loading docks and people living or working nearby.
• Prohibiting off-road diesel-powered equipment from being in the “on” position for more than 10 hours per day.
• Using electric-powered hand tools, forklifts, and pressure washers, and providing electrical hook ups to the power grid rather than use of diesel-fueled generators to supply theirpower. • Designating an area in the construction site where electric-powered construction vehicles and equipment can charge.
• Keeping onsite and furnishing to the lead agency or other regulators upon request, all equipment maintenance records and data sheets, including design specifications and emission control tier classifications.
• Conducting an on-site inspection to verify compliance with construction mitigation and to identify other opportunities to further reduce construction impacts.

The SCAQMD staff recommends: 42
• Clearly mark truck routes with signs so that trucks will not travel next to or near sensitive land uses (e.g., residences, schools, daycare centers, etc.). • Design the Proposed Project such that truck entrances and exits are not facing sensitive receptors and trucks will not travel past sensitive land uses to enter or leave the Proposed Project site.
42 “Draft Environmental Impact Report (EIR) for the Proposed CADO Menifee Industrial Warehouse Project (Proposed Project).” SCAQMD, April 2024, available at: https://www.aqmd.gov/docs/default-source/ceqa/comment-letters/2024/april-2024/RVC240313-05.pdf?sfvrsn=8, p. 2 - 3. 8g.
cont.
58

Page 406 of 9818 ends

• Design the Proposed Project such that any truck check-in point is inside the Proposed Project site to ensure no trucks are queuing outside.
• Design the Proposed Project to ensure that truck traffic inside the Proposed Project site is as far away as feasible from sensitive receptors.
• Restrict overnight truck parking in sensitive land uses by providing overnight truck parking inside the Proposed Project site.

As demonstrated above, we have provided several mitigation measures that would reduce Project-related VOC and DPM emissions developed from sources including CARB, the DOJ and others. These measures offer a cost-effective, feasible way to incorporate lower-emitting design features into the proposed Project, which subsequently reduce emissions released during Project construction and operation.

An EIR should be prepared that includes all feasible mitigation measures, if applicable, as well as updated air quality and health risk analyses. The EIR should also demonstrate a commitment to the implementation of these measures prior to Project approval, to ensure that the Project’s potentially significant emissions are reduced to the maximum extent possible.

Disclaimer
SWAPE has received limited documentation regarding this project. Additional information may become available in the future; thus, we retain the right to revise or amend this report when additional information becomes available. Our professional services have been performed using that degree of care and skill ordinarily exercised, under similar circumstances, by reputable environmental consultants practicing in this or similar localities at the time of service. No other warranty, expressed or implied, is made as to the scope of work, work methodologies and protocols, site conditions, analytical testing results, and findings presented. This report reflects efforts which were limited to information that was reasonably accessible at the time of the work, and may contain informational gaps, inconsistencies, or otherwise be incomplete due to the unavailability or uncertainty of information obtained or provided by third parties.

Sincerely,
Matt Hagemann, P.G., C.Hg.
8g.
cont.
8h.
59

Page 407 of 9818 ends

Attachment A: CalEEMod Output Files
Attachment B: Health Risk Calculations
Attachment C: AERSCREEN Output Files, Construction
Attachment D: AERSCREEN Output Files, Operations
Attachment E: Matt Hagemann CV
60

Page 408 of 9818 ends

CRP IV Valley Center Detailed Report
Attachment A
Table of Contents

1. Basic Project Information

1.1. Basic Project Information

1.2. Land Use Types

1.3. User-Selected Emission Reduction Measures by Emissions Sector

2. Emissions Summary

2.1. Construction Emissions Compared Against Thresholds

2.2. Construction Emissions by Year

2.2.1. Total Construction Emissions by Year, Unmitigated

2.2.2. Onsite Construction Emissions by Year, Unmitigated

2.2.3. Offsite Construction Emissions by Year, Unmitigated

3. Construction Emissions Details

3.1. Demolition (2026)

3.1.1. Onsite - Unmitigated

3.1.2. Offsite - Unmitigated

3.2. Site Preparation (2026)
61

Page 409 of 9818 ends

3.2.1. Onsite - Unmitigated

3.2.2. Offsite - Unmitigated

3.3. Grading (2026)

3.3.1. Onsite - Unmitigated

3.3.2. Offsite - Unmitigated

3.4. Building Construction (2026)

3.4.1. Onsite - Unmitigated

3.4.2. Offsite - Unmitigated

3.5. Building Construction (2027)

3.5.1. Onsite - Unmitigated

3.5.2. Offsite - Unmitigated

3.6. Paving (2027)

3.6.1. Onsite - Unmitigated

3.6.2. Offsite - Unmitigated

3.7. Architectural Coating (2027)

3.7.1. Onsite - Unmitigated

3.7.2. Offsite - Unmitigated

4. Operations Emissions Details
62

Page 410 of 9818 ends

4.10. Soil Carbon Accumulation By Vegetation Type

4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated

4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated

4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated

5. Activity Data

5.1. Construction Schedule

5.2. Off-Road Equipment

5.2.1. Unmitigated

5.3. Construction Vehicles

5.3.1. Unmitigated

5.4. Vehicles

5.4.1. Construction Vehicle Control Strategies

5.5. Architectural Coatings

5.6. Dust Mitigation

5.6.1. Construction Earthmoving Activities

5.6.2. Construction Earthmoving Control Strategies

5.7. Construction Paving

5.8. Construction Electricity Consumption and Emissions Factors 63

Page 411 of 9818 ends

5.18. Vegetation

5.18.1. Land Use Change

5.18.1.1. Unmitigated

5.18.1. Biomass Cover Type

5.18.1.1. Unmitigated

5.18.2. Sequestration

5.18.2.1. Unmitigated

6. Climate Risk Detailed Report

6.1. Climate Risk Summary

6.2. Initial Climate Risk Scores

6.3. Adjusted Climate Risk Scores

6.4. Climate Risk Reduction Measures

7. Health and Equity Details

7.1. CalEnviroScreen 4.0 Scores

7.2. Healthy Places Index Scores

7.3. Overall Health & Equity Scores

7.4. Health & Equity Measures

7.5. Evaluation Scorecard
64

Page 412 of 9818 ends

7.6. Health & Equity Custom Measures

8. User Changes to Default Data

8.1. Justifications

8.3. Land Use

8.4. Construction

8.4.1. Construction Phases

8.4.2. Off-Road Equipment

8.4.6. Trips and VMT
65

Page 413 of 9818 ends

1. Basic Project Information

1.1. Basic Project Information
Data Field Value
Project Name CRP IV Valley Center
Construction Start Date 3/2/2026
Lead Agency —
Land Use Scale Project/site
Analysis Level for Defaults County
Windspeed (m/s) 1.80000
Precipitation (days) 22.4000
Location 184 S 6th Ave, City of Industry, CA 91746, USA County Los Angeles-South Coast
City Industry
Air District South Coast AQMD
Air Basin South Coast
TAZ 5045
EDFZ 7
Electric Utility City of Industry
Gas Utility Southern California Gas
App Version 2022.1.1.43

1.2. Land Use Types
Land Use Subtype Size Unit Lot Acreage Building Area (sq ft) Landscape Area (sq ft)
Special Landscape
Area (sq ft)
Population Description
Unrefrigerated
Warehouse-No Rail
141.000 1000sqft 3.23691 140,720 45,570.0 — — —
Parking Lot 191.000 Space 1.71900 0.00000
66 — — — —

Page 414 of 9818 ends

Other Asphalt
Surfaces

1.50000 Acre 1.50000 0.00000 — — — —
User Defined
Industrial
141.000 User Defined Unit 0.00000 0.00000 — — — —

1.3. User-Selected Emission Reduction Measures by Emissions Sector No measures selected

2. Emissions Summary

2.1. Construction Emissions Compared Against Thresholds Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit. TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 3.81644 3.20923 29.2658 29.9550 0.04913 1.24296 19.8943 21.1373 1.14334 10.1584 11.3018 — 5,566.22 5,566.22 0.22604 0.15521 4.31014 5,589.36 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 82.4185 81.9494 47.2617 30.9142 0.18744 1.24296 20.0287 21.1746 1.14334 10.1584 11.3018 — 26,667.3 26,667.3 1.31585 3.71232 1.37784 27,807.8 Average
Daily
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 3.85187 3.82782 9.28817 11.5210 0.02582 0.31578 2.21269 2.52847 0.28991 0.69948 0.98940 — 3,484.67 3,484.67 0.15453 0.24596 2.01894 3,563.85 Annual
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 0.70297 0.69858 1.69509 2.10259 0.00471 0.05763 0.40382 0.46145 0.05291 0.12766 0.18056 — 576.927 576.927 0.02558 0.04072 0.33426 590.035

2.2. Construction Emissions by Year

2.2.1. Total Construction Emissions by Year, Unmitigated 67

Page 415 of 9818 ends

Includes both onsite and offsite emissions.

Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily -
Summer
(Max)
— — — — — — — — — — — — — — — — — —
2026 3.81644 3.20923 29.2658 29.9550 0.04913 1.24296 19.8943 21.1373 1.14334 10.1584 11.3018 — 5,566.22 5,566.22 0.22604 0.15521 4.31014 5,589.36 Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
2026 4.20640 3.20880 47.2617 29.7897 0.18744 1.24296 20.0287 21.1746 1.14334 10.1584 11.3018 — 26,667.3 26,667.3 1.31585 3.71232 1.37784 27,807.8 2027 82.4185 81.9494 19.6173 30.9142 0.04753 0.68279 1.35101 2.03380 0.62851 0.32348 0.95199 — 6,133.07 6,133.07 0.21941 0.15910 0.13692 6,186.11 Average
Daily
— — — — — — — — — — — — — — — — — —
2026 1.18915 0.94747 9.28817 11.5210 0.02582 0.31578 2.21269 2.52847 0.28991 0.69948 0.98940 — 3,484.67 3,484.67 0.15453 0.24596 2.01894 3,563.85 2027 3.85187 3.82782 1.00495 1.59448 0.00246 0.03483 0.06961 0.10445 0.03207 0.01667 0.04874 — 319.029 319.029 0.01138 0.00848 0.12007 321.959 Annual — — — — — — — — — — — — — — — — — —
2026 0.21702 0.17291 1.69509 2.10259 0.00471 0.05763 0.40382 0.46145 0.05291 0.12766 0.18056 — 576.927 576.927 0.02558 0.04072 0.33426 590.035 2027 0.70297 0.69858 0.18340 0.29099 0.00045 0.00636 0.01270 0.01906 0.00585 0.00304 0.00890 — 52.8188 52.8188 0.00188 0.00140 0.01988 53.3040

2.2.2. Onsite Construction Emissions by Year, Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily -
Summer
(Max)
— — — — — — — — — — — — — — — — — —
2026 3.74146 3.14387 29.1635 28.8082 0.04890 1.24251 19.6570 20.8995 1.14311 10.1024 11.2456 — 5,297.94 5,297.94 0.21491 0.04298 0.00000 5,316.12 Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
2026 3.74146 3.14387 29.1635 28.8082 0.04890 1.24251 19.6570 20.8995 1.14311 10.1024 11.2456 — 5,297.94 5,297.94 0.21491 0.04298 0.00000 5,316.12 2027 82.0194 81.6158 18.5750 25.9821 0.04326 0.67852 0.00000 0.67852 0.62424 0.00000 0.62424 — 4,406.31 4,406.31 0.17874 0.03575 0.00000 4,421.43 68

Page 416 of 9818 ends

Average
Daily
— — — — — — — — — — — — — — — — — —
2026 0.97480 0.81681 7.51596 9.17921 0.01629 0.29707 1.44192 1.73899 0.27331 0.50361 0.77692 — 1,694.13 1,694.13 0.06872 0.01374 0.00000 1,699.94 2027 3.83100 3.81042 0.94875 1.32550 0.00222 0.03460 0.00000 0.03460 0.03183 0.00000 0.03183 — 226.839 226.839 0.00920 0.00184 0.00000 227.618 Annual — — — — — — — — — — — — — — — — — —
2026 0.17790 0.14907 1.37166 1.67521 0.00297 0.05422 0.26315 0.31737 0.04988 0.09191 0.14179 — 280.482 280.482 0.01138 0.00228 0.00000 281.445 2027 0.69916 0.69540 0.17315 0.24190 0.00041 0.00631 0.00000 0.00631 0.00581 0.00000 0.00581 — 37.5559 37.5559 0.00152 0.00030 0.00000 37.6847

2.2.3. Offsite Construction Emissions by Year, Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily -
Summer
(Max)
— — — — — — — — — — — — — — — — — —
2026 0.28842 0.23536 0.92635 4.13301 0.00530 0.01038 0.93509 0.94363 0.00993 0.22599 0.23026 — 1,393.13 1,393.13 0.05786 0.13120 4.31014 1,432.42 Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
2026 1.48150 0.29890 26.6102 9.99871 0.15491 0.30281 6.56045 6.86326 0.30236 1.78846 2.09081 — 23,240.7 23,240.7 1.17685 3.68452 1.37784 24,369.5 2027 0.39909 0.33363 1.04232 4.93210 0.00427 0.00427 1.35101 1.35528 0.00427 0.32348 0.32776 — 1,726.76 1,726.76 0.04067 0.12335 0.13692 1,764.67 Average
Daily
— — — — — — — — — — — — — — — — — —
2026 0.21435 0.13067 1.77221 2.34184 0.00952 0.01871 0.77077 0.78948 0.01661 0.19587 0.21248 — 1,790.54 1,790.54 0.08581 0.23221 2.01894 1,863.91 2027 0.02087 0.01739 0.05620 0.26899 0.00023 0.00023 0.06961 0.06985 0.00023 0.01667 0.01691 — 92.1891 92.1891 0.00218 0.00664 0.12007 94.3410 Annual — — — — — — — — — — — — — — — — — —
2026 0.03912 0.02385 0.32343 0.42739 0.00174 0.00341 0.14067 0.14408 0.00303 0.03575 0.03878 — 296.445 296.445 0.01421 0.03845 0.33426 308.591 2027 0.00381 0.00317 0.01026 0.04909 0.00004 0.00004 0.01270 0.01275 0.00004 0.00304 0.00309 — 15.2630 15.2630 0.00036 0.00110 0.01988 15.6192

3. Construction Emissions Details
69

Page 417 of 9818 ends

3.1. Demolition (2026)

3.1.1. Onsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

2.72490 2.28674 20.6515 19.0056 0.03253 0.84309 — 0.84309 0.77564 — 0.77564 — 3,426.59 3,426.59 0.13900 0.02780 — 3,438.35 Demoliti
on
— — — — — — 13.4683 13.4683 — 2.03948 2.03948 — — — — — — — Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.12691 0.10651 0.96185 0.88519 0.00151 0.03927 — 0.03927 0.03613 — 0.03613 — 159.595 159.595 0.00647 0.00129 — 160.142 Demoliti
on
— — — — — — 0.62729 0.62729 — 0.09499 0.09499 — — — — — — — Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.02316 0.01944 0.17554 0.16155 0.00028 0.00717 — 0.00717 0.00659 — 0.00659 — 26.4227 26.4227 0.00107 0.00021 — 26.5134 70

Page 418 of 9818 ends

Demoliti
on
— — — — — — 0.11448 0.11448 — 0.01734 0.01734 — — — — — — — Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000

3.1.2. Offsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.06234 0.05490 0.06531 0.82673 0.00000 0.00000 0.19606 0.19606 0.00000 0.04596 0.04596 — 192.664 192.664 0.00876 0.00711 0.01785 195.020 Vendor 0.00442 0.00178 0.07188 0.03405 0.00045 0.00090 0.01711 0.01801 0.00045 0.00473 0.00518 — 62.3861 62.3861 0.00259 0.00890 0.00437 65.1068 Hauling 1.41475 0.24223 26.4730 9.13793 0.15446 0.30191 6.34728 6.64918 0.30191 1.73777 2.03968 — 22,985.7 22,985.7 1.16550 3.66851 1.35562 24,109.4 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.00289 0.00254 0.00331 0.04030 0.00000 0.00000 0.00900 0.00900 0.00000 0.00211 0.00211 — 9.10582 9.10582 0.00041 0.00033 0.01385 9.22856 Vendor 0.00021 0.00009 0.00337 0.00157 0.00002 0.00004 0.00079 0.00083 0.00002 0.00022 0.00024 — 2.90479 2.90479 0.00012 0.00041 0.00338 3.03469 Hauling 0.06622 0.01161 1.25114 0.42413 0.00719 0.01406 0.29239 0.30645 0.01406 0.08013 0.09419 — 1,070.44 1,070.44 0.05428 0.17086 1.04560 1,123.76 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00053 0.00046 0.00060 0.00735 0.00000 0.00000 0.00164 0.00164 0.00000 0.00038 0.00038 — 1.50757 1.50757 0.00007 0.00005 0.00229 1.52789 Vendor 0.00004 0.00002 0.00061 0.00029 <

0.000005

0.00001 0.00014 0.00015 <

0.000005

0.00004 0.00004 — 0.48092 0.48092 0.00002 0.00007 0.00056 0.50243 Hauling 0.01209 0.00212 0.22833 0.07740 0.00131 0.00257 0.05336 0.05593 0.00257 0.01462 0.01719 — 177.224 177.224 0.00899 0.02829 0.17311 186.051

3.2. Site Preparation (2026)

3.2.1. Onsite - Unmitigated
71

Page 419 of 9818 ends

Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

3.74146 3.14387 29.1635 28.8082 0.04890 1.24251 — 1.24251 1.14311 — 1.14311 — 5,297.94 5,297.94 0.21491 0.04298 — 5,316.12 Dust
From
Material
Movemen
— — — — — — 19.6570 19.6570 — 10.1024 10.1024 — — — — — — — Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

3.74146 3.14387 29.1635 28.8082 0.04890 1.24251 — 1.24251 1.14311 — 1.14311 — 5,297.94 5,297.94 0.21491 0.04298 — 5,316.12 Dust
From
Material
Movemen
— — — — — — 19.6570 19.6570 — 10.1024 10.1024 — — — — — — — Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.09226 0.07752 0.71910 0.71034 0.00121 0.03064 — 0.03064 0.02819 — 0.02819 — 130.634 130.634 0.00530 0.00106 — 131.082 Dust
From
Material
Movemen
— — — — — — 0.48469 0.48469 — 0.24910 0.24910 — — — — — — — 72

Page 420 of 9818 ends

Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.01684 0.01415 0.13124 0.12964 0.00022 0.00559 — 0.00559 0.00514 — 0.00514 — 21.6280 21.6280 0.00088 0.00018 — 21.7022 Dust
From
Material
Movemen
— — — — — — 0.08846 0.08846 — 0.04546 0.04546 — — — — — — — Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000

3.2.2. Offsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.07272 0.06443 0.06790 1.13023 0.00000 0.00000 0.22874 0.22874 0.00000 0.05362 0.05362 — 237.102 237.102 0.00984 0.00829 0.80224 240.622 Vendor 0.00225 0.00093 0.03437 0.01663 0.00022 0.00045 0.00856 0.00901 0.00022 0.00236 0.00259 — 31.1771 31.1771 0.00130 0.00445 0.08425 32.6196 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.07272 0.06404 0.07620 0.96452 0.00000 0.00000 0.22874 0.22874 0.00000 0.05362 0.05362 — 224.775 224.775 0.01022 0.00829 0.02082 227.523 Vendor 0.00221 0.00089 0.03594 0.01702 0.00022 0.00045 0.00856 0.00901 0.00022 0.00236 0.00259 — 31.1930 31.1930 0.00130 0.00445 0.00219 32.5534 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.00178 0.00157 0.00205 0.02489 0.00000 0.00000 0.00556 0.00556 0.00000 0.00130 0.00130 — 5.62418 5.62418 0.00025 0.00020 0.00856 5.69999 Vendor 0.00006 0.00002 0.00089 0.00042 0.00001 0.00001 0.00021 0.00022 0.00001 0.00006 0.00006 — 0.76891 0.76891 0.00003 0.00011 0.00090 0.80330 73

Page 421 of 9818 ends

Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00033 0.00029 0.00037 0.00454 0.00000 0.00000 0.00101 0.00101 0.00000 0.00024 0.00024 — 0.93115 0.93115 0.00004 0.00003 0.00142 0.94370 Vendor 0.00001 <

0.000005

0.00016 0.00008 <

0.000005
<

0.000005

0.00004 0.00004 <

0.000005

0.00001 0.00001 — 0.12730 0.12730 0.00001 0.00002 0.00015 0.13300 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000

3.3. Grading (2026)

3.3.1. Onsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

1.95871 1.64586 14.9701 17.4372 0.02732 0.64622 — 0.64622 0.59452 — 0.59452 — 2,959.64 2,959.64 0.12006 0.02401 — 2,969.79 Dust
From
Material
Movemen
— — — — — — 7.08396 7.08396 — 3.42494 3.42494 — — — — — — — Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.09123 0.07666 0.69724 0.81214 0.00127 0.03010 — 0.03010 0.02769 — 0.02769 — 137.846 137.846 0.00559 0.00112 — 138.319 74

Page 422 of 9818 ends

Dust
From
Material
Movemen
— — — — — — 0.32994 0.32994 — 0.15952 0.15952 — — — — — — — Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.01665 0.01399 0.12725 0.14822 0.00023 0.00549 — 0.00549 0.00505 — 0.00505 — 22.8220 22.8220 0.00093 0.00019 — 22.9003 Dust
From
Material
Movemen
— — — — — — 0.06021 0.06021 — 0.02911 0.02911 — — — — — — — Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000

3.3.2. Offsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.06234 0.05523 0.05820 0.96877 0.00000 0.00000 0.19606 0.19606 0.00000 0.04596 0.04596 — 203.230 203.230 0.00843 0.00711 0.68763 206.247 Vendor 0.00451 0.00187 0.06875 0.03325 0.00045 0.00090 0.01711 0.01801 0.00045 0.00473 0.00518 — 62.3543 62.3543 0.00259 0.00890 0.16850 65.2392 Hauling 0.04486 0.00794 0.79940 0.28528 0.00485 0.00948 0.19930 0.20878 0.00948 0.05457 0.06405 — 721.608 721.608 0.03660 0.11519 1.64030 758.490 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.00289 0.00254 0.00331 0.04030 0.00000 0.00000 0.00900 0.00900 0.00000 0.00211 0.00211 — 9.10582 9.10582 0.00041 0.00033 0.01385 9.22856 Vendor 0.00021 0.00009 0.00337 0.00157 0.00002 0.00004 0.00079 0.00083 0.00002 0.00022 0.00024 — 2.90479 2.90479 0.00012 0.00041 0.00338 3.03469 75

Page 423 of 9818 ends

Hauling 0.00208 0.00036 0.03929 0.01332 0.00023 0.00044 0.00918 0.00962 0.00044 0.00252 0.00296 — 33.6119 33.6119 0.00170 0.00537 0.03283 35.2862 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00053 0.00046 0.00060 0.00735 0.00000 0.00000 0.00164 0.00164 0.00000 0.00038 0.00038 — 1.50757 1.50757 0.00007 0.00005 0.00229 1.52789 Vendor 0.00004 0.00002 0.00061 0.00029 <

0.000005

0.00001 0.00014 0.00015 <

0.000005

0.00004 0.00004 — 0.48092 0.48092 0.00002 0.00007 0.00056 0.50243 Hauling 0.00038 0.00007 0.00717 0.00243 0.00004 0.00008 0.00168 0.00176 0.00008 0.00046 0.00054 — 5.56484 5.56484 0.00028 0.00089 0.00544 5.84203

3.4. Building Construction (2026)

3.4.1. Onsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

1.38013 1.15520 10.6724 14.0661 0.02555 0.40936 — 0.40936 0.37661 — 0.37661 — 2,629.89 2,629.89 0.10668 0.02134 — 2,638.91 Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

1.38013 1.15520 10.6724 14.0661 0.02555 0.40936 — 0.40936 0.37661 — 0.37661 — 2,629.89 2,629.89 0.10668 0.02134 — 2,638.91 Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
76

Page 424 of 9818 ends

Off-Roa
d
Equipm

0.66441 0.55613 5.13777 6.77153 0.01230 0.19707 — 0.19707 0.18130 — 0.18130 — 1,266.05 1,266.05 0.05136 0.01027 — 1,270.40 Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.12125 0.10149 0.93764 1.23580 0.00224 0.03597 — 0.03597 0.03309 — 0.03309 — 209.609 209.609 0.00850 0.00170 — 210.329 Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000

3.4.2. Offsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.24561 0.21760 0.22933 3.81709 0.00000 0.00000 0.77252 0.77252 0.00000 0.18108 0.18108 — 800.760 800.760 0.03323 0.02801 2.70938 812.648 Vendor 0.04281 0.01776 0.65312 0.31592 0.00427 0.00855 0.16256 0.17111 0.00427 0.04491 0.04919 — 592.366 592.366 0.02463 0.08453 1.60076 619.772 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.24561 0.21630 0.25734 3.25746 0.00000 0.00000 0.77252 0.77252 0.00000 0.18108 0.18108 — 759.128 759.128 0.03453 0.02801 0.07032 768.410 Vendor 0.04197 0.01692 0.68286 0.32346 0.00427 0.00855 0.16256 0.17111 0.00427 0.04491 0.04919 — 592.668 592.668 0.02463 0.08453 0.04155 618.515 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.11761 0.10350 0.13486 1.64125 0.00000 0.00000 0.36655 0.36655 0.00000 0.08584 0.08584 — 370.844 370.844 0.01662 0.01349 0.56421 375.842 Vendor 0.02041 0.00835 0.33063 0.15410 0.00206 0.00411 0.07731 0.08142 0.00206 0.02138 0.02344 — 285.231 285.231 0.01186 0.04069 0.33237 297.986 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 77 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000

Page 425 of 9818 ends

Annual — — — — — — — — — — — — — — — — — —
Worker 0.02146 0.01889 0.02461 0.29953 0.00000 0.00000 0.06690 0.06690 0.00000 0.01566 0.01566 — 61.3974 61.3974 0.00275 0.00223 0.09341 62.2250 Vendor 0.00372 0.00152 0.06034 0.02812 0.00038 0.00075 0.01411 0.01486 0.00038 0.00390 0.00428 — 47.2232 47.2232 0.00196 0.00674 0.05503 49.3350 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000

3.5. Building Construction (2027)

3.5.1. Onsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

1.32845 1.11196 10.1725 14.0369 0.02554 0.36460 — 0.36460 0.33543 — 0.33543 — 2,629.71 2,629.71 0.10667 0.02133 — 2,638.73 Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.07279 0.06093 0.55740 0.76914 0.00140 0.01998 — 0.01998 0.01838 — 0.01838 — 144.094 144.094 0.00585 0.00117 — 144.588 Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
78

Page 426 of 9818 ends

Off-Roa
d
Equipm
ent

0.01328 0.01112 0.10173 0.14037 0.00026 0.00365 — 0.00365 0.00335 — 0.00335 — 23.8563 23.8563 0.00097 0.00019 — 23.9382 Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000

3.5.2. Offsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.23519 0.20587 0.25473 3.00794 0.00000 0.00000 0.77252 0.77252 0.00000 0.18108 0.18108 — 744.632 744.632 0.01042 0.02801 0.06343 753.305 Vendor 0.03728 0.01692 0.65043 0.30469 0.00427 0.00427 0.16256 0.16683 0.00427 0.04491 0.04919 — 581.221 581.221 0.02463 0.08026 0.03935 605.793 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.01289 0.01128 0.01396 0.17321 0.00000 0.00000 0.04172 0.04172 0.00000 0.00977 0.00977 — 41.4038 41.4038 0.00057 0.00154 0.05780 41.9333 Vendor 0.00209 0.00095 0.03586 0.01651 0.00023 0.00023 0.00880 0.00903 0.00023 0.00243 0.00267 — 31.8375 31.8375 0.00135 0.00440 0.03582 33.2175 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00235 0.00206 0.00255 0.03161 0.00000 0.00000 0.00761 0.00761 0.00000 0.00178 0.00178 — 6.85486 6.85486 0.00009 0.00025 0.00957 6.94253 Vendor 0.00038 0.00017 0.00654 0.00301 0.00004 0.00004 0.00161 0.00165 0.00004 0.00044 0.00049 — 5.27106 5.27106 0.00022 0.00073 0.00593 5.49954 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000

3.6. Paving (2027)
79

Page 427 of 9818 ends

3.6.1. Onsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.96164 0.80622 7.29423 10.4447 0.01541 0.28852 — 0.28852 0.26544 — 0.26544 — 1,598.59 1,598.59 0.06485 0.01297 — 1,604.07 Paving 0.49610 0.49610 — — — — — — — — — — — — — — — —
Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.04479 0.03755 0.33973 0.48647 0.00072 0.01344 — 0.01344 0.01236 — 0.01236 — 74.4548 74.4548 0.00302 0.00060 — 74.7103 Paving 0.02311 0.02311 — — — — — — — — — — — — — — — —
Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.00817 0.00685 0.06200 0.08878 0.00013 0.00245 — 0.00245 0.00226 — 0.00226 — 12.3268 12.3268 0.00050 0.00010 — 12.3691 Paving 0.00422 0.00422 — — — — — — — — — — — — — — — —
Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 80

Page 428 of 9818 ends

3.6.2. Offsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.07959 0.06967 0.08620 1.01787 0.00000 0.00000 0.26142 0.26142 0.00000 0.06128 0.06128 — 251.980 251.980 0.00353 0.00948 0.02146 254.915 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.00371 0.00324 0.00401 0.04982 0.00000 0.00000 0.01200 0.01200 0.00000 0.00281 0.00281 — 11.9092 11.9092 0.00016 0.00044 0.01662 12.0615 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00068 0.00059 0.00073 0.00909 0.00000 0.00000 0.00219 0.00219 0.00000 0.00051 0.00051 — 1.97171 1.97171 0.00003 0.00007 0.00275 1.99692 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000

3.7. Architectural Coating (2027)

3.7.1. Onsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
81

Page 429 of 9818 ends

Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.18287 0.15113 1.10822 1.50052 0.00230 0.02540 — 0.02540 0.02337 — 0.02337 — 178.017 178.017 0.00722 0.00144 — 178.628 Architect
ural
Coating
s

79.0504 79.0504 — — — — — — — — — — — — — — — —
Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.00852 0.00704 0.05162 0.06989 0.00011 0.00118 — 0.00118 0.00109 — 0.00109 — 8.29120 8.29120 0.00034 0.00007 — 8.31966 Architect
ural
Coating
s

3.68180 3.68180 — — — — — — — — — — — — — — — —
Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.00155 0.00128 0.00942 0.01275 0.00002 0.00022 — 0.00022 0.00020 — 0.00020 — 1.37270 1.37270 0.00006 0.00001 — 1.37741 Architect
ural
Coating
s

0.67193 0.67193 — — — — — — — — — — — — — — — —
Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 82

Page 430 of 9818 ends

3.7.2. Offsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.04704 0.04117 0.05095 0.60159 0.00000 0.00000 0.15450 0.15450 0.00000 0.03622 0.03622 — 148.926 148.926 0.00208 0.00560 0.01269 150.661 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.00219 0.00192 0.00237 0.02945 0.00000 0.00000 0.00709 0.00709 0.00000 0.00166 0.00166 — 7.03864 7.03864 0.00010 0.00026 0.00983 7.12866 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00040 0.00035 0.00043 0.00537 0.00000 0.00000 0.00129 0.00129 0.00000 0.00030 0.00030 — 1.16533 1.16533 0.00002 0.00004 0.00163 1.18023 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000

4. Operations Emissions Details

4.10. Soil Carbon Accumulation By Vegetation Type

4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetati
on
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e 83

Page 431 of 9818 ends

Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —

4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —

4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
84

Page 432 of 9818 ends

Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
85

Page 433 of 9818 ends

5. Activity Data

5.1. Construction Schedule
Phase Name Phase Type Start Date End Date Days Per Week Work Days per Phase Phase Description Demolition Demolition 3/2/2026 3/24/2026 5.00000 17.0000 — Site Preparation Site Preparation 3/25/2026 4/6/2026 5.00000 9.00000 — Grading Grading 4/7/2026 4/29/2026 5.00000 17.0000 —
Building Construction Building Construction 4/30/2026 1/28/2027 5.00000 196.000 — Paving Paving 1/6/2027 1/28/2027 5.00000 17.0000 —
Architectural Coating Architectural Coating 1/6/2027 1/28/2027 5.00000 17.0000 —

5.2. Off-Road Equipment

5.2.1. Unmitigated
Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor Demolition Concrete/Industrial
Saws
Diesel Average 1.000000 8.00000 33.0000 0.73000
Demolition Excavators Diesel Average 3.00000 8.00000 36.0000 0.38000 Demolition Rubber Tired Dozers Diesel Average 2.00000 8.00000 367.000 0.40000 Site Preparation Rubber Tired Dozers Diesel Average 3.00000 8.00000 367.000 0.40000 Site Preparation Tractors/Loaders/Back
hoes
Diesel Average 4.00000 8.00000 84.0000 0.37000
Grading Excavators Diesel Average 1.000000 8.00000 36.0000 0.38000 Grading Graders Diesel Average 1.000000 8.00000 148.000 0.41000 Grading Rubber Tired Dozers Diesel Average 1.000000 8.00000 367.000 0.40000 Grading Tractors/Loaders/Back
hoes
Diesel Average 3.00000 8.00000 84.0000 0.37000
Building Construction Cranes Diesel Average 1.000000 8.00000 367.000 0.29000 Building Construction Forklifts Diesel Average 3.00000 8.00000 82.0000 0.20000 86

Page 434 of 9818 ends

Building Construction Generator Sets Diesel Average 1.000000 8.00000 14.0000 0.74000 Building Construction Tractors/Loaders/Back
hoes
Diesel Average 3.00000 8.00000 84.0000 0.37000
Building Construction Welders Diesel Average 1.000000 8.00000 46.0000 0.45000 Paving Pavers Diesel Average 1.000000 8.00000 81.0000 0.42000 Paving Paving Equipment Diesel Average 2.00000 8.00000 89.0000 0.36000 Paving Rollers Diesel Average 2.00000 8.00000 36.0000 0.38000 Paving Tractors/Loaders/Back
hoes
Diesel Average 1.000000 8.00000 84.0000 0.37000
Paving Cement and Mortar
Mixers
Diesel Average 2.00000 8.00000 10.00000 0.56000
Architectural Coating Air Compressors Diesel Average 1.000000 8.00000 37.0000 0.48000

5.3. Construction Vehicles

5.3.1. Unmitigated
Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle Mix Demolition Worker 15.0000 18.5000 LDA,LDT1,LDT2
Demolition Vendor 2.00000 10.2000 HHDT,MHDT
Demolition Hauling 159.235 43.0000 HHDT
Demolition Onsite truck — — HHDT
Site Preparation Worker 17.5000 18.5000 LDA,LDT1,LDT2
Site Preparation Vendor 1.000000 10.2000 HHDT,MHDT
Site Preparation Hauling 0.00000 43.0000 HHDT
Site Preparation Onsite truck — — HHDT
Grading Worker 15.0000 18.5000 LDA,LDT1,LDT2
Grading Vendor 2.00000 10.2000 HHDT,MHDT
Grading Hauling 5.00000 43.0000 HHDT
Grading Onsite truck — — HHDT
87

Page 435 of 9818 ends

Building Construction Worker 59.1024 18.5000 LDA,LDT1,LDT2 Building Construction Vendor 19.0000 10.2000 HHDT,MHDT
Building Construction Hauling 0.00000 43.0000 HHDT
Building Construction Onsite truck — — HHDT
Paving Worker 20.0000 18.5000 LDA,LDT1,LDT2
Paving Vendor — 10.2000 HHDT,MHDT
Paving Hauling 0.00000 43.0000 HHDT
Paving Onsite truck — — HHDT
Architectural Coating Worker 11.8205 18.5000 LDA,LDT1,LDT2 Architectural Coating Vendor — 10.2000 HHDT,MHDT
Architectural Coating Hauling 0.00000 43.0000 HHDT
Architectural Coating Onsite truck — — HHDT

5.4. Vehicles

5.4.1. Construction Vehicle Control Strategies
Non-applicable. No control strategies activated by user.

5.5. Architectural Coatings
Phase Name Residential Interior Area
Coated (sq ft)
Residential Exterior Area
Coated (sq ft)
Non-Residential Interior Area
Coated (sq ft)
Non-Residential Exterior Area
Coated (sq ft)
Parking Area Coated (sq ft)
Architectural Coating 0.00000 0.00000 211,080 70,360.0 8,413.18

5.6. Dust Mitigation

5.6.1. Construction Earthmoving Activities
Phase Name Material Imported (cy) Material Exported (cy) Acres Graded (acres) Material Demolished (Ton of Debris)
Acres Paved (acres)
Demolition 0.00000 0.00000 0.00000 10,828.0 0.00000
88

Page 436 of 9818 ends

Site Preparation — — 13.5000 0.00000 0.00000
Grading — 680.000 17.0000 0.00000 0.00000
Paving 0.00000 0.00000 0.00000 0.00000 3.21900

5.6.2. Construction Earthmoving Control Strategies
Non-applicable. No control strategies activated by user.

5.7. Construction Paving
Phase Name Land Use Area Paved (acres) % Asphalt
Paving Unrefrigerated Warehouse-No Rail 0.00000 0%
Paving Parking Lot 1.71900 100%
Paving Other Asphalt Surfaces 1.50000 100%
Paving User Defined Industrial 0.00000 0%

5.8. Construction Electricity Consumption and Emissions Factors kWh per Year and Emission Factor (lb/MWh)
Year kWh per Year CO2 CH4 N2O
2026 0.00000 453.209 0.03300 0.00400
2027 0.00000 453.209 0.03300 0.00400

5.18. Vegetation

5.18.1. Land Use Change

5.18.1.1. Unmitigated
Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres

5.18.1. Biomass Cover Type
89

Page 437 of 9818 ends

5.18.1.1. Unmitigated
Biomass Cover Type Initial Acres Final Acres

5.18.2. Sequestration

5.18.2.1. Unmitigated
Tree Type Number Electricity Saved (kWh/year) Natural Gas Saved (btu/year)

6. Climate Risk Detailed Report

6.1. Climate Risk Summary
Cal-Adapt midcentury 2040–2059 average projections for four hazards are reported below for your project location. These are under Representation Concentration Pathway (RCP) 8.5 which assumes GHG emissions will continue to rise strongly through 2050 and then plateau around 2100.

Climate Hazard Result for Project Location Unit
Temperature and Extreme Heat 17.7600 annual days of extreme heat Extreme Precipitation 5.80000 annual days with precipitation above 20 mm Sea Level Rise — meters of inundation depth
Wildfire 0.48000 annual hectares burned
Temperature and Extreme Heat data are for grid cell in which your project are located. The projection is based on the 98th historical percentile of daily maximum/minimum temperatures from observed historical data (32 climate model ensemble from Cal-Adapt, 2040–2059 average under RCP 8.5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.

Extreme Precipitation data are for the grid cell in which your project are located. The threshold of 20 mm is equivalent to about ¾ an inch of rain, which would be light to moderate rainfall if received over a full day or heavy rain if received over a period of 2 to 4 hours. Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.

Sea Level Rise data are for the grid cell in which your project are located. The projections are from Radke et al. (2017), as reported in Cal-Adapt (Radke et al., 2017, CEC-500-2017-008), and consider inundation location and depth for the San Francisco Bay, the Sacramento-San Joaquin River Delta and California coast resulting different increments of sea level rise coupled with extreme storm events. Users may select from four scenarios to view the range in potential inundation depth for the grid cell. The four scenarios are: No rise, 0.5 meter, 1.0 meter, 1.41 meters Wildfire data are for the grid cell in which your project are located. The projections are from UC Davis, as reported in Cal-Adapt (2040–2059 average under RCP 8.5), and consider historical data of climate, vegetation, population density, and large (> 400 ha) fire history. Users may select from four model simulations to view the range in potential wildfire probabilities for the grid cell. The four simulations make different assumptions about expected rainfall and temperature are: Warmer/drier (HadGEM2-ES), Cooler/wetter (CNRM-CM5), Average conditions (CanESM2), Range of different rainfall and temperature possibilities (MIROC5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.

6.2. Initial Climate Risk Scores
90

Page 438 of 9818 ends

Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat 2 0 0 N/A
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise 1 0 0 N/A
Wildfire 1 0 0 N/A
Flooding N/A N/A N/A N/A
Drought N/A N/A N/A N/A
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation 0 0 0 N/A
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.

The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.

The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores do not include implementation of climate risk reduction measures.

6.3. Adjusted Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat 2 1 1 3
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise 1 1 1 2
Wildfire 1 1 1 2
Flooding N/A N/A N/A N/A
Drought N/A N/A N/A N/A
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation 1 1 1 2
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.

The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.
91

Page 439 of 9818 ends

The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores include implementation of climate risk reduction measures.

6.4. Climate Risk Reduction Measures

7. Health and Equity Details

7.1. CalEnviroScreen 4.0 Scores
The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state.

Indicator Result for Project Census Tract
Exposure Indicators —
AQ-Ozone 71.7610
AQ-PM 86.1605
AQ-DPM 82.7256
Drinking Water 94.7421
Lead Risk Housing 83.4026
Pesticides 0.00000
Toxic Releases 85.3713
Traffic 76.9000
Effect Indicators —
CleanUp Sites 89.6976
Groundwater 99.3027
Haz Waste Facilities/Generators 99.6823
Impaired Water Bodies 58.6938
Solid Waste 92.0733
Sensitive Population —
Asthma 48.2802
Cardio-vascular 70.0523
Low Birth Weights 8.14729
Socioeconomic Factor Indicators — 92

Page 440 of 9818 ends

Education 72.5133
Housing 52.0913
Linguistic 72.5132
Poverty 76.4322
Unemployment 69.9766

7.2. Healthy Places Index Scores
The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.

Indicator Result for Project Census Tract
Economic —
Above Poverty 34.67214167
Employed 60.78532016
Median HI 30.61722058
Education —
Bachelor's or higher 26.52380341
High school enrollment 7.006287694
Preschool enrollment 6.454510458
Transportation —
Auto Access 71.35891184
Active commuting 75.24701655
Social —
2-parent households 20.23610933
Voting 7.789041447
Neighborhood —
Alcohol availability 71.26908764
Park access 4.439881945
Retail density 88.93879122
Supermarket access 13.56345438
93

Page 441 of 9818 ends

Tree canopy 15.25728218
Housing —
Homeownership 43.80854613
Housing habitability 49.98075196
Low-inc homeowner severe housing cost burden 95.4446298 Low-inc renter severe housing cost burden 26.31849095
Uncrowded housing 22.16091364
Health Outcomes —
Insured adults 28.37161555
Arthritis 0.0
Asthma ER Admissions 53.5
High Blood Pressure 0.0
Cancer (excluding skin) 0.0
Asthma 0.0
Coronary Heart Disease 0.0
Chronic Obstructive Pulmonary Disease 0.0
Diagnosed Diabetes 0.0
Life Expectancy at Birth 1.0
Cognitively Disabled 33.5
Physically Disabled 39.7
Heart Attack ER Admissions 47.6
Mental Health Not Good 0.0
Chronic Kidney Disease 0.0
Obesity 0.0
Pedestrian Injuries 99.3
Physical Health Not Good 0.0
Stroke 0.0
Health Risk Behaviors —
94

Page 442 of 9818 ends

Binge Drinking 0.0
Current Smoker 0.0
No Leisure Time for Physical Activity 0.0
Climate Change Exposures —
Wildfire Risk 0.0
SLR Inundation Area 0.0
Children 33.8
Elderly 74.7
English Speaking 46.4
Foreign-born 80.5
Outdoor Workers 73.3
Climate Change Adaptive Capacity —
Impervious Surface Cover 62.1
Traffic Density 80.7
Traffic Access 47.4
Other Indices —
Hardship 68.8
Other Decision Support —
2016 Voting 16.6

7.3. Overall Health & Equity Scores
Metric Result for Project Census Tract
CalEnviroScreen 4.0 Score for Project Location (a) 92.0000 Healthy Places Index Score for Project Location (b) 22.0000 Project Located in a Designated Disadvantaged Community (Senate Bill 535) Yes Project Located in a Low-Income Community (Assembly Bill 1550) Yes Project Located in a Community Air Protection Program Community (Assembly Bill 617) No 95

Page 443 of 9818 ends

a: The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state. b: The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.

7.4. Health & Equity Measures
No Health & Equity Measures selected.

7.5. Evaluation Scorecard
Health & Equity Evaluation Scorecard not completed.

7.6. Health & Equity Custom Measures
No Health & Equity Custom Measures created.

8. User Changes to Default Data

8.1. Justifications
Screen Justification
Land Use Consistent with IS/MND.

Construction: Construction Phases Consistent with IS/MND.

Construction: Off-Road Equipment Consistent with IS/MND.

Construction: Trips and VMT See comment on: "Incorrect Construction Hauling Trip Length".

8.3. Land Use
Model Parameter Units Default Value New Value
Building Area sq. ft 141,000 140,720
Landscape Area sq. ft — 45,570.0

8.4. Construction

8.4.1. Construction Phases
Phase Type Phase Name Model Parameter Default Value New Value Demolition Demolition End Date 3/30/2026 3/24/2026
96

Page 444 of 9818 ends

Demolition Demolition Work Days per Phase 20.0000 17.0000 Site Preparation Site Preparation Start Date 3/31/2026 3/25/2026 Site Preparation Site Preparation End Date 4/14/2026 4/6/2026 Site Preparation Site Preparation Work Days per Phase 10.00000 9.00000 Grading Grading Start Date 4/15/2026 4/7/2026
Grading Grading End Date 5/13/2026 4/29/2026
Grading Grading Work Days per Phase 20.0000 17.0000
Building Construction Building Construction Start Date 5/14/2026 4/30/2026 Building Construction Building Construction End Date 4/1/2027 1/28/2027 Building Construction Building Construction Work Days per Phase 230.000 196.000 Paving Paving Start Date 4/2/2027 1/6/2027
Paving Paving End Date 4/30/2027 1/28/2027
Paving Paving Work Days per Phase 20.0000 17.0000
Architectural Coating Architectural Coating Start Date 5/1/2027 1/6/2027 Architectural Coating Architectural Coating End Date 5/29/2027 1/28/2027 Architectural Coating Architectural Coating Work Days per Phase 20.0000 17.0000

8.4.2. Off-Road Equipment
Phase Name Equipment Type Model Parameter Default Value New Value Building Construction Cranes Hours Per Day 7.00000 8.00000 Building Construction Tractors/Loaders/Backhoes Hours Per Day 7.00000 8.00000 Paving Pavers Number per Day 2.00000 1.000000
Architectural Coating Air Compressors Hours Per Day 6.00000 8.00000

8.4.6. Trips and VMT
Phase Name Trip Type Model Parameter Default Value New Value Demolition Hauling Miles per Trip 20.0000 43.0000
Site Preparation Hauling Miles per Trip 20.0000 43.0000 97

Page 445 of 9818 ends

Grading Hauling Miles per Trip 20.0000 43.0000
Building Construction Vendor One-Way Trips per Day 23.0640 19.0000 Building Construction Hauling Miles per Trip 20.0000 43.0000 Paving Hauling Miles per Trip 20.0000 43.0000
Architectural Coating Hauling Miles per Trip 20.0000 43.0000 98

Page 446 of 9818 ends

Construction
2026 Total
Annual Emissions (tons/year) 0.06 Total DPM (lbs) 101.7534247 Daily Emissions (lbs/day) 0.328767123 Total DPM (g) 46155.35342 Construction Duration (days) 305 Emission Rate (g/s) 0.001609053 Total DPM (lbs) 100.2739726 Release Height (meters) 3
Total DPM (g) 45484.27397 Total Acreage 6.47
Start Date 3/2/2026 Max Horizontal (meters) 228.84
End Date 1/1/2027 Min Horizontal (meters) 114.42
Construction Days 305 Initial Vertical Dimension (meters) 1.5 2027 Setting Urban
Annual Emissions (tons/year) 0.01 Population 256
Daily Emissions (lbs/day) 0.054794521 Start Date 3/2/2026 Construction Duration (days) 27 End Date 1/28/2027
Total DPM (lbs) 1.479452055 Total Construction Days 332 Total DPM (g) 671.0794521 Total Years of Construction 0.91 Start Date 1/1/2027 Total Years of Operation 29.09
End Date 1/28/2027
Construction Days 27
Operation
Emission Rate
Annual Emissions (tons/year) 0.02
Daily Emissions (lbs/day) 0.109589041
Total DPM (lbs) 40
Emission Rate (g/s) 0.000575342
Release Height (meters) 3
Total Acreage 6.47
Max Horizontal (meters) 228.84
Min Horizontal (meters) 114.42
Initial Vertical Dimension (meters) 1.5
Setting Urban
Population 256
Attachment B
99

Page 447 of 9818 ends

The Maximally Exposed Individual at an Existing Residential Receptor Age Group Emissions Source Duration (years) Concentration (ug/m3) Cancer Risk
3rd Trimester Construction 0.25 0.1387 1.89E-06
Construction 0.66 0.1387 1.50E-05
Operation 1.34 0.0496 1.09E-05
Infant (0 - 2) Total 2 2.59E-05
Child (2 - 16) Operation 14 0.0496 1.79E-05
Adult (16 - 30) Operation 14 0.0496 1.99E-06
Lifetime 30 4.78E-05
100

Page 448 of 9818 ends

Attachment C
AERSCREEN 21112 / AERMOD 21112 05/20/26
14:19:21
TITLE: CRP Valley Center, Construction
****************************** AREA PARAMETERS **************************** SOURCE EMISSION RATE: 0.161E-02 g/s 0.128E-01 lb/hr
AREA EMISSION RATE: 0.615E-07 g/(s-m2) 0.488E-06 lb/(hr-m2) AREA HEIGHT: 3.00 meters 9.84 feet
AREA SOURCE LONG SIDE: 228.84 meters 750.79 feet
AREA SOURCE SHORT SIDE: 114.42 meters 375.39 feet
INITIAL VERTICAL DIMENSION: 1.50 meters 4.92 feet
RURAL OR URBAN: URBAN
POPULATION: 256
INITIAL PROBE DISTANCE = 5000. meters 16404. feet
*********************** BUILDING DOWNWASH PARAMETERS **********************

BUILDING DOWNWASH NOT USED FOR NON-POINT SOURCES
************************** FLOW SECTOR ANALYSIS *************************** 25 meter receptor spacing: 1. meters - 5000. meters

MAXIMUM IMPACT RECEPTOR
Zo
SECTOR

SURFACE

ROUGHNESS
1-HR CONC
(ug/m3)
RADIAL
(deg)
DIST
(m)

TEMPORAL
PERIOD
1*
* = worst

1.000
case diagonal

3.294 25 125.0 WIN
101

Page 449 of 9818 ends

********************** MAKEMET METEOROLOGY PARAMETERS ********************* MIN/MAX TEMPERATURE: 250.0 / 310.0 (K)
MINIMUM WIND SPEED: 0.5 m/s
ANEMOMETER HEIGHT: 10.000 meters
SURFACE CHARACTERISTICS INPUT: AERMET SEASONAL TABLES
DOMINANT SURFACE PROFILE: Urban
DOMINANT CLIMATE TYPE: Average Moisture
DOMINANT SEASON: Winter
ALBEDO: 0.35
BOWEN RATIO: 1.50
ROUGHNESS LENGTH: 1.000 (meters)
SURFACE FRICTION VELOCITY (U*) NOT ADUSTED

METEOROLOGY CONDITIONS USED TO PREDICT OVERALL MAXIMUM IMPACT

YR MO DY JDY HR
-- -- -- --- --
10 01 10 10 01
H0 U* W* DT/DZ ZICNV ZIMCH M-O LEN Z0 BOWEN ALBEDO REF WS - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -1.30 0.043 -9.000 0.020 -999. 21. 6.0 1.000 1.50 0.35 0.50

HT REF TA HT
- - - - - - - - - - -

10.0 310.0 2.0
************************ AERSCREEN AUTOMATED DISTANCES **********************

OVERALL MAXIMUM CONCENTRATIONS BY DISTANCE
DIST

MAXIMUM
1-HR CONC DIST

MAXIMUM
1-HR CONC
(m) (ug/m3) (m) (ug/m3)

1.00 2.399 2525.00 0.6952E-01
102

Page 450 of 9818 ends

25.00 2.631 2550.00 0.6859E
-01

50.00 2.859 2575.00 0.6768E-01

75.00 3.057 2600.00 0.6680E-01
100.00 3.230 2625.00 0.6593E-01
125.00 3.294 2650.00 0.6508E-01
150.00 2.581 2675.00 0.6425E-01
175.00 2.092 2700.00 0.6344E-01
200.00 1.787 2725.00 0.6265E-01
225.00 1.565 2750.00 0.6187E-01
250.00 1.387 2775.00 0.6111E-01
275.00 1.239 2800.00 0.6037E-01
300.00 1.117 2825.00 0.5964E-01
325.00 1.013 2850.00 0.5892E-01
350.00 0.9257 2875.00 0.5822E-01
375.00 0.8497 2900.00 0.5754E-01
400.00 0.7837 2925.00 0.5687E-01
425.00 0.7267 2950.00 0.5621E-01
450.00 0.6756 2975.00 0.5557E-01
475.00 0.6308 3000.00 0.5494E-01
500.00 0.5908 3025.00 0.5432E-01
525.00 0.5550 3050.00 0.5371E-01
550.00 0.5228 3075.00 0.5311E-01
575.00 0.4936 3100.00 0.5253E-01
600.00 0.4670 3125.00 0.5196E-01
625.00 0.4429 3150.00 0.5139E-01
650.00 0.4210 3174.99 0.5084E-01
675.00 0.4010 3200.00 0.5030E-01
700.00 0.3822 3225.00 0.4977E-01
725.00 0.3649 3250.00 0.4925E-01
750.00 0.3490 3275.00 0.4873E-01
775.00 0.3344 3300.00 0.4823E-01
800.00 0.3208 3325.00 0.4774E-01
825.00 0.3081 3350.00 0.4725E-01
850.00 0.2961 3375.00 0.4677E-01
875.00 0.2850 3400.00 0.4630E-01
900.00 0.2746 3425.00 0.4589E-01
925.00 0.2648 3450.00 0.4566E-01
950.00 0.2556 3475.00 0.4543E-01
975.00 0.2469 3500.00 0.4520E-01
1000.00 0.2388 3525.00 0.4497E-01
1025.00 0.2311 3550.00 0.4475E-01
1050.00 0.2238 3575.00 0.4453E-01
1075.00 0.2169 3600.00 0.4431E-01
1100.00 0.2103 3625.00 0.4410E-01
1125.00 0.2041 3650.00 0.4389E-01
1150.00 0.1982 3675.00 0.4368E-01
1175.00 0.1926 3700.00 0.4347E-01
1200.00 0.1873 3725.00 0.4327E-01
1225.00 0.1822 3750.00 0.4306E-01
1250.00 0.1774 3775.00 0.4286E-01
103

Page 451 of 9818 ends

1275.00 0.1728 3800.00 0.4267E
-01
1300.00 0.1683 3825.00 0.4247E-01
1325.00 0.1641 3849.99 0.4228E-01
1350.00 0.1600 3875.00 0.4209E-01
1375.00 0.1562 3900.00 0.4190E-01
1400.00 0.1524 3925.00 0.4171E-01
1425.00 0.1488 3950.00 0.4152E-01
1450.00 0.1454 3975.00 0.4134E-01
1475.00 0.1421 4000.00 0.4116E-01
1500.00 0.1389 4025.00 0.4098E-01
1525.00 0.1358 4050.00 0.4080E-01
1550.00 0.1329 4075.00 0.4063E-01
1575.00 0.1300 4100.00 0.4045E-01
1600.00 0.1273 4125.00 0.4028E-01
1625.00 0.1247 4150.00 0.4011E-01
1650.00 0.1221 4175.00 0.3994E-01
1675.00 0.1197 4200.00 0.3977E-01
1700.00 0.1173 4225.00 0.3961E-01
1725.00 0.1150 4250.00 0.3945E-01
1750.00 0.1128 4275.00 0.3928E-01
1775.00 0.1107 4300.00 0.3912E-01
1800.00 0.1086 4325.00 0.3896E-01
1825.00 0.1067 4350.00 0.3881E-01
1850.00 0.1047 4375.00 0.3865E-01
1875.00 0.1029 4400.00 0.3850E-01
1900.00 0.1010 4425.00 0.3835E-01
1925.00 0.9928E-01 4450.00 0.3819E-01
1950.00 0.9758E-01 4475.00 0.3804E-01
1975.00 0.9591E-01 4500.00 0.3790E-01
2000.00 0.9430E-01 4525.00 0.3775E-01
2025.00 0.9273E-01 4550.00 0.3760E-01
2050.00 0.9121E-01 4575.00 0.3746E-01
2075.00 0.8973E-01 4600.00 0.3732E-01
2100.00 0.8829E-01 4625.00 0.3718E-01
2125.00 0.8800E-01 4650.00 0.3703E-01
2150.00 0.8660E-01 4675.00 0.3690E-01
2175.00 0.8525E-01 4700.00 0.3676E-01
2200.00 0.8392E-01 4725.00 0.3662E-01
2225.00 0.8264E-01 4750.00 0.3649E-01
2250.00 0.8139E-01 4775.00 0.3635E-01
2275.00 0.8017E-01 4800.00 0.3622E-01
2300.00 0.7898E-01 4825.00 0.3609E-01
2325.00 0.7782E-01 4850.00 0.3596E-01
2350.00 0.7669E-01 4875.00 0.3583E-01
2375.00 0.7559E-01 4900.00 0.3570E-01
2400.00 0.7452E-01 4925.00 0.3557E-01
2425.00 0.7347E-01 4950.00 0.3545E-01
2450.00 0.7245E-01 4975.00 0.3532E-01
2475.00 0.7145E-01 5000.00 0.3520E-01
2500.00 0.7047E-01
104

Page 452 of 9818 ends

********************** AERSCREEN MAXIMUM IMPACT SUMMARY ********************* 3-hour, 8-hour, and 24-hour scaled
concentrations are equal to the 1-hour concentration as referenced in

SCREENING PROCEDURES FOR ESTIMATING THE AIR QUALITY
IMPACT OF STATIONARY SOURCES, REVISED (Section 4.5.4)
Report number EPA-454/R-92-019
http://www.epa.gov/scram001/guidance_permit.htm
under Screening Guidance

CALCULATION

MAXIMUM
1-HOUR
CONC
SCALED
3-HOUR
CONC
SCALED
8-HOUR
CONC
SCALED
24-HOUR
CONC
SCALED
ANNUAL
CONC
PROCEDURE (ug/m3) (ug/m3) (ug/m3) (ug/m3) (ug/m3)
FLAT TERRAIN 3.297 3.297 3.297 3.297 N/A
DISTANCE FROM SOURCE 126.00 meters

IMPACT AT THE
AMBIENT BOUNDARY 2.399 2.399 2.399 2.399 N/A
DISTANCE FROM SOURCE1.00 meters
105

Page 453 of 9818 ends

Attachment D
AERSCREEN 21112 / AERMOD 21112 05/20/26
14:27:34
TITLE: CRV Valley Center, Operations
****************************** AREA PARAMETERS **************************** SOURCE EMISSION RATE: 0.575E-03 g/s 0.457E-02 lb/hr
AREA EMISSION RATE: 0.220E-07 g/(s-m2) 0.174E-06 lb/(hr-m2) AREA HEIGHT: 3.00 meters 9.84 feet
AREA SOURCE LONG SIDE: 228.84 meters 750.79 feet
AREA SOURCE SHORT SIDE: 114.42 meters 375.39 feet
INITIAL VERTICAL DIMENSION: 1.50 meters 4.92 feet
RURAL OR URBAN: URBAN
POPULATION: 256
INITIAL PROBE DISTANCE = 5000. meters 16404. feet
*********************** BUILDING DOWNWASH PARAMETERS **********************

BUILDING DOWNWASH NOT USED FOR NON-POINT SOURCES
************************** FLOW SECTOR ANALYSIS *************************** 25 meter receptor spacing: 1. meters - 5000. meters

MAXIMUM IMPACT RECEPTOR
Zo
SECTOR

SURFACE

ROUGHNESS
1-HR CONC
(ug/m3)
RADIAL
(deg)
DIST
(m)

TEMPORAL
PERIOD
1*
* = worst

1.000
case diagonal

1.178 25 125.0 WIN
106

Page 454 of 9818 ends

********************** MAKEMET METEOROLOGY PARAMETERS ********************* MIN/MAX TEMPERATURE: 250.0 / 310.0 (K)
MINIMUM WIND SPEED: 0.5 m/s
ANEMOMETER HEIGHT: 10.000 meters
SURFACE CHARACTERISTICS INPUT: AERMET SEASONAL TABLES
DOMINANT SURFACE PROFILE: Urban
DOMINANT CLIMATE TYPE: Average Moisture
DOMINANT SEASON: Winter
ALBEDO: 0.35
BOWEN RATIO: 1.50
ROUGHNESS LENGTH: 1.000 (meters)
SURFACE FRICTION VELOCITY (U*) NOT ADUSTED

METEOROLOGY CONDITIONS USED TO PREDICT OVERALL MAXIMUM IMPACT

YR MO DY JDY HR
-- -- -- --- --
10 01 10 10 01
H0 U* W* DT/DZ ZICNV ZIMCH M-O LEN Z0 BOWEN ALBEDO REF WS - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -1.30 0.043 -9.000 0.020 -999. 21. 6.0 1.000 1.50 0.35 0.50

HT REF TA HT
- - - - - - - - - - -

10.0 310.0 2.0
************************ AERSCREEN AUTOMATED DISTANCES **********************

OVERALL MAXIMUM CONCENTRATIONS BY DISTANCE
DIST

MAXIMUM
1-HR CONC DIST

MAXIMUM
1-HR CONC
(m) (ug/m3) (m) (ug/m3)

1.00 0.8579 2525.00 0.2486E-01
107

Page 455 of 9818 ends

25.00 0.9407 2550.00 0.2452E
-01

50.00 1.022 2575.00 0.2420E-01

75.00 1.093 2600.00 0.2388E-01
100.00 1.155 2625.00 0.2357E-01
125.00 1.178 2650.00 0.2327E-01
150.00 0.9229 2675.00 0.2297E-01
175.00 0.7478 2700.00 0.2268E-01
200.00 0.6389 2725.00 0.2240E-01
225.00 0.5595 2750.00 0.2212E-01
250.00 0.4958 2775.00 0.2185E-01
275.00 0.4430 2800.00 0.2158E-01
300.00 0.3993 2825.00 0.2132E-01
325.00 0.3623 2850.00 0.2107E-01
350.00 0.3310 2875.00 0.2082E-01
375.00 0.3038 2900.00 0.2057E-01
400.00 0.2802 2925.00 0.2033E-01
425.00 0.2598 2950.00 0.2010E-01
450.00 0.2415 2975.00 0.1987E-01
475.00 0.2255 3000.00 0.1964E-01
500.00 0.2112 3025.00 0.1942E-01
525.00 0.1984 3050.00 0.1920E-01
550.00 0.1869 3075.00 0.1899E-01
575.00 0.1765 3100.00 0.1878E-01
600.00 0.1670 3125.00 0.1858E-01
625.00 0.1583 3150.00 0.1838E-01
650.00 0.1505 3174.99 0.1818E-01
675.00 0.1434 3200.00 0.1798E-01
700.00 0.1366 3225.00 0.1779E-01
725.00 0.1305 3250.00 0.1761E-01
750.00 0.1248 3275.00 0.1742E-01
775.00 0.1195 3300.00 0.1724E-01
800.00 0.1147 3325.00 0.1707E-01
825.00 0.1101 3350.00 0.1689E-01
850.00 0.1059 3375.00 0.1672E-01
875.00 0.1019 3400.00 0.1656E-01
900.00 0.9817E-01 3425.00 0.1641E-01
925.00 0.9466E-01 3450.00 0.1632E-01
950.00 0.9137E-01 3475.00 0.1624E-01
975.00 0.8827E-01 3500.00 0.1616E-01
1000.00 0.8536E-01 3525.00 0.1608E-01
1025.00 0.8262E-01 3550.00 0.1600E-01
1050.00 0.8001E-01 3575.00 0.1592E-01
1075.00 0.7753E-01 3600.00 0.1584E-01
1100.00 0.7519E-01 3625.00 0.1577E-01
1125.00 0.7296E-01 3650.00 0.1569E-01
1150.00 0.7086E-01 3675.00 0.1562E-01
1175.00 0.6886E-01 3700.00 0.1554E-01
1200.00 0.6695E-01 3725.00 0.1547E-01
1225.00 0.6514E-01 3750.00 0.1540E-01
1250.00 0.6342E-01 3775.00 0.1532E-01
108

Page 456 of 9818 ends

1275.00 0.6177E
-01 3800.00 0.1525E-01
1300.00 0.6018E-01 3825.00 0.1518E-01
1325.00 0.5867E-01 3850.00 0.1512E-01
1350.00 0.5722E-01 3875.00 0.1505E-01
1375.00 0.5583E-01 3900.00 0.1498E-01
1400.00 0.5450E-01 3925.00 0.1491E-01
1425.00 0.5321E-01 3950.00 0.1485E-01
1450.00 0.5198E-01 3975.00 0.1478E-01
1475.00 0.5079E-01 4000.00 0.1472E-01
1500.00 0.4965E-01 4025.00 0.1465E-01
1525.00 0.4856E-01 4050.00 0.1459E-01
1550.00 0.4750E-01 4075.00 0.1452E-01
1575.00 0.4649E-01 4100.00 0.1446E-01
1600.00 0.4552E-01 4125.00 0.1440E-01
1625.00 0.4458E-01 4150.00 0.1434E-01
1650.00 0.4367E-01 4175.00 0.1428E-01
1675.00 0.4279E-01 4200.00 0.1422E-01
1700.00 0.4195E-01 4225.00 0.1416E-01
1725.00 0.4113E-01 4250.00 0.1410E-01
1750.00 0.4034E-01 4275.00 0.1405E-01
1775.00 0.3958E-01 4300.00 0.1399E-01
1800.00 0.3884E-01 4325.00 0.1393E-01
1825.00 0.3813E-01 4350.00 0.1387E-01
1850.00 0.3744E-01 4375.00 0.1382E-01
1875.00 0.3677E-01 4400.00 0.1376E-01
1900.00 0.3612E-01 4425.00 0.1371E-01
1925.00 0.3550E-01 4450.00 0.1366E-01
1950.00 0.3489E-01 4475.00 0.1360E-01
1975.00 0.3429E-01 4500.00 0.1355E-01
2000.00 0.3372E-01 4525.00 0.1350E-01
2025.00 0.3316E-01 4550.00 0.1344E-01
2050.00 0.3261E-01 4575.00 0.1339E-01
2075.00 0.3208E-01 4600.00 0.1334E-01
2100.00 0.3157E-01 4625.00 0.1329E-01
2125.00 0.3146E-01 4650.00 0.1324E-01
2150.00 0.3096E-01 4675.00 0.1319E-01
2175.00 0.3048E-01 4700.00 0.1314E-01
2200.00 0.3001E-01 4725.00 0.1309E-01
2225.00 0.2955E-01 4750.00 0.1304E-01
2250.00 0.2910E-01 4775.00 0.1300E-01
2275.00 0.2866E-01 4800.00 0.1295E-01
2300.00 0.2824E-01 4825.00 0.1290E-01
2325.00 0.2782E-01 4850.00 0.1286E-01
2350.00 0.2742E-01 4875.00 0.1281E-01
2375.00 0.2703E-01 4900.00 0.1276E-01
2400.00 0.2664E-01 4924.99 0.1272E-01
2425.00 0.2627E-01 4950.00 0.1267E-01
2450.00 0.2590E-01 4975.00 0.1263E-01
2475.00 0.2554E-01 5000.00 0.1258E-01
2500.00 0.2520E-01
109

Page 457 of 9818 ends

********************** AERSCREEN MAXIMUM IMPACT SUMMARY ********************* 3-hour, 8-hour, and 24-hour scaled
concentrations are equal to the 1-hour concentration as referenced in

SCREENING PROCEDURES FOR ESTIMATING THE AIR QUALITY
IMPACT OF STATIONARY SOURCES, REVISED (Section 4.5.4)
Report number EPA-454/R-92-019
http://www.epa.gov/scram001/guidance_permit.htm
under Screening Guidance

CALCULATION

MAXIMUM
1-HOUR
CONC
SCALED
3-HOUR
CONC
SCALED
8-HOUR
CONC
SCALED
24-HOUR
CONC
SCALED
ANNUAL
CONC
PROCEDURE (ug/m3) (ug/m3) (ug/m3) (ug/m3) (ug/m3)
FLAT TERRAIN 1.179 1.179 1.179 1.179 N/A
DISTANCE FROM SOURCE 126.00 meters

IMPACT AT THE
AMBIENT BOUNDARY 0.8579 0.8579 0.8579 0.8579 N/A
DISTANCE FROM SOURCE 1.00 meters
110

Page 458 of 9818 ends

Attachment E
2219 Main Street, Suite 600
Santa Monica, CA 90405
(949) 887-9013
[email protected]
Matthew F. Hagemann, P.G., C.Hg.
• Geologic and Hydrogeologic Characterization, Investigation and Remediation Strategies • IndustrialStormwaterCompliance
• CEQAReview
• Expert Testimony
Professional Certifications:

California Professional Geologist, P.G.

California Certified Hydrogeologist, C.Hg.

Education:

M.S. Degree, Geology, California State University Los Angeles, Los Angeles, CA, 1984.

B.A. Degree, Geology, Humboldt State University, Arcata, CA, 1982.

Professional Experience:
30 years of experience in environmental policy, contaminant assessment and remediation, stormwater compliance, and CEQA review. Spent nine years with the U.S. EPA in the Resource Conservation Recovery Act (RCRA) and Superfund programs and served as EPA’s Senior Science Policy Advisor in the Western Regional Office where I identified emerging threats to groundwater. While with EPA, I served as a Senior Hydrogeologist in the oversight of the assessment of seven major military facilities undergoing base closure. Led numerous enforcement actions under provisions of the Resource Conservation and Recovery Act (RCRA) and directed efforts to improve hydrogeologic characterization and water quality monitoring. For the past 15 years, as a founding partner with SWAPE, I developed extensive client relationships and has managed complex projects that include consultations as an expert witness and a regulatory specialist, and managing projects ranging from industrial stormwater compliance to CEQA review of impacts from hazardous waste, air quality and greenhouse gas emissions.

Positions held include:

Government:

Senior Science Policy Advisor and Hydrogeologist, U.S. Environmental Protection Agency (1989–1998); 111

Page 459 of 9818 ends

Hydrogeologist, National Park Service, Water Resources Division (1998 – 2000); Geologist, U.S. Forest Service (1986 – 1998).

Educational:

Geology Instructor, Golden West College, 2010 – 2104, 2017; Adjunct FacultyMember, San Francisco State University, Department of Geosciences (1993 – 1998); Instructor, College of Marin, Department of Science (1990 – 1995).

Private Sector:

FoundingPartner,Soil/Water/AirProtectionEnterprise(SWAPE)(2003 – present); Senior Environmental Analyst, Komex H2O Science, Inc. (2000 -- 2003); Executive Director, Orange Coast Watch (2001 – 2004);
Geologist, Dames & Moore (1984 – 1986).

Senior Regulatory and Litigation Support Analyst:

With SWAPE, responsibilities have included:
• Lead analyst and testifying expert, for both plaintiffs and defendants, in the review of over 300 environmental impact reports and negative declarations since 2003 under CEQA that identify significant issues with regard to hazardous waste, water resources, water quality, air quality, greenhouse gas emissions, and geologic hazards.
• Recommending additional mitigation measures to lead agencies at the local and county level to include additional characterization of health risks and implementation of protective measures to reduce exposure to hazards from toxins.
• Stormwater analysis, sampling and best management practice evaluation, for both government agencies and corporate clients, at more than 150 industrialfacilities. • Servingas expert witness forbothplaintiffs anddefendants incases includingcontaminationof groundwater, CERCLAcompliance in assessment and remediation, and industrial stormwater contamination.
• Technical assistance and litigation supportfor vaporintrusion concerns, for both government agencies and corporate clients.
• Lead analyst and testifying expert in the review of environmental issues in license applicationsfor large solar power plants before the California Energy Commission. • Manager of a project to evaluate numerous formerly used military sites in the western U.S. • Manager of a comprehensive evaluation of potential sources of perchlorate contamination in Southern California drinking water wells.
• Manager and designated expert for litigation support under provisions of Proposition 65 in the review of releases of gasoline to sources drinking water at major refineries and hundreds ofgas stations throughoutCalifornia.

With Komex H2O Science Inc., duties included the following:
• Senior author of a report on the extent of perchlorate contamination that was used in testimony by the former U.S. EPA Administrator and General Counsel.
• Senior researcher in the development of a comprehensive, electronically interactive chronology of MTBE use, research, and regulation.
• Senior researcher in the development of a comprehensive, electronically interactive chronology of perchlorate use, research, andregulation.
• Seniorresearcherin a study that estimates nationwide costs for MTBE remediation and drinking 112

Page 460 of 9818 ends

water treatment, results of which were published in newspapers nationwide and in testimony against provisions of an energy bill that would limit liability for oil companies. • Researchto supportlitigationto restoredrinking water supplies that have beencontaminated by MTBE in California and New York.
• Lead authorfor a multi-volume remedial investigation report for an operating school in LosAngeles that met strict SateofCaliforniaregulatory requirements. • Development of strategic approaches for cleanup of contaminated sites in consultation withclients and regulators.

Hydrogeology:

As a Senior Hydrogeologist with the U.S. Environmental Protection Agency, led investigations to characterize and cleanup closing military bases, including Mare Island Naval Shipyard, Hunters Point Naval Shipyard, Treasure Island Naval Station, Alameda Naval Station, Moffett Field, Mather Army Airfield, and Sacramento Army Depot. Specific activities included:
• Leading efforts to model groundwater flow and contaminant transport, ensured adequacy of monitoring networks, and assessed cleanup alternatives for contaminated sediment, soil, and groundwater.
• Initiating a regional program for evaluation of groundwater sampling practices and laboratory analysis at militarybases.
• Identifyingemergingissues,wrote technical guidance, andassistedinpolicyandregulation development through work on four national U.S. EPA workgroups, including the Superfund Groundwater Technical Forum and the Federal Facilities Forum.

At the request of the State of Hawaii, developed a methodology to determine the vulnerability of groundwater to contamination on the islands of Maui and Oahu. Used analytical models and a GIS to show zones of vulnerability, and the results were adopted and published by the State of Hawaii and County of Maui.

As a hydrogeologist with the EPA Groundwater Protection Section, worked with provisions of the Safe Drinking Water Act and NEPA to prevent drinking water contamination. Specific activities included the following:
• Received an EPA Bronze Medal for contribution to the development of national guidance for the protection of drinkingwater.
• Managed the Sole Source Aquifer Program and protected the drinking water of two communities through designation under the Safe Drinking Water Act. Prepared geologic reports, conducted hearings, andrespondedto public comments fromresidents whowere veryconcernedaboutthe impact of designation.
• Reviewed a number of Environmental Impact Statements for planned major developments, including large hazardous and solid waste disposal facilities, mine reclamation, and watertransfer.

Served as a hydrogeologist with the RCRA Hazardous Waste program. Duties included:
• Supervised the hydrogeologic investigation of hazardous waste sites to determine compliancewith Subtitle C requirements.
• Reviewed and wrote ʺpart Bʺ permits forthe disposal of hazardous waste. • Conducted RCRA Corrective Actioninvestigations of waste sites and led inspections thatformedthe basis for significant enforcement actions that were developed in close coordination with U.S.EPA legal counsel.
113

Page 461 of 9818 ends

• Wrote contract specifications and supervised contractor’s investigations of waste sites.

With the National Park Service, directed service-wide investigations of contaminant sources to prevent degradation of water quality, including the following:
• Applied pertinent laws and regulations including CERCLA, RCRA, NEPA, NRDA, and theClean Water Act to control military, mining, and landfill contaminants. • Conducted watershed-scale investigations of contaminants at parks, including Yellowstone and Olympic National Park.
• Identified high-levels of perchlorate in soil adjacentto a national park in New Mexicoand advised park superintendent on appropriate response actions under CERCLA. • Served as a Park Service representative on the InteragencyPerchlorate Steering Committee, a national workgroup.
• Developed a programto conduct environmental compliance auditsof all NationalParks while serving on a nationalworkgroup.
• Co-authored two papers on the potential for water contamination from the operation of personal watercraft andsnowmobiles,thesepapers servingas the basis forthedevelopmentof nation- wide policy on the use of these vehicles in National Parks.
• Contributed to the Federal Multi-Agency Source Water Agreement underthe Clean WaterAction Plan.

Policy:

Served as senior management as the Senior Science Policy Advisor with the U.S. Environmental Protection Agency, Region 9. Activities included the following:
• Advising the Regional Administrator and senior management on emerging issues such as the potential forthe gasoline additive MTBE and ammonium perchlorate to contaminate drinkingwater supplies.
• Shaping EPA’s national response to these threats by serving on workgroups and by contributingto guidance, including the Office of Research and Development publication, Oxygenates in Water:

Critical Information and Research Needs.
• Improving the technical training of EPAʹs scientific and engineering staff. • Earning an EPA Bronze Medal for representing the region’s 300 scientists and engineers in negotiations with the Administrator and senior management to better integrate scientific principles into the policy-makingprocess.
• Establishing national protocol for the peer review of scientific documents.

Geology:

With the U.S. Forest Service, led investigations to determine hillslope stability of areas proposed for timber harvest in the central Oregon Coast Range. Specific activities included:
• Mapping geology in the field, and used aerial photographic interpretationand mathematicalmodels to determine slopestability.
• Coordinatingresearchwithcommunitystakeholderswhowere concernedwithnaturalresource protection.
• Characterizing the geology of an aquiferthat serves as the sole source of drinking waterforthecity of Medford, Oregon.
114

Page 462 of 9818 ends

As a consultant with Dames and Moore, led geologic investigations of two contaminated sites (later listed on the Superfund NPL) in the Portland, Oregon, area and a large RCRA hazardous waste site in eastern Oregon.

Duties included the following:
• Supervising year-long effort for soil and groundwater sampling. • Conducting aquifertests.
• Investigating active faults beneath sites proposed for hazardous waste disposal.

Teaching:

From 1990 to 1998, taught at least one course per semester at the community collegeand university levels:
• At San Francisco State University, held an adjunct faculty position and taught courses in environmental geology, oceanography (lab and lecture), hydrogeology, and groundwater contamination.
• Served as a committee memberfor graduate and undergraduate students. • Taught courses in environmental geology and oceanography at the College of Marin. • Part time geology instructor at Golden West College in Huntington Beach, California from 2010 to 2014 and in 2017.

Summary of Testimony Experience Over Past Four Years
In Re New Jersey Department of Environmental Protection et al. vs. E.I. DuPont de Nemours and Company, in the United States District Court, District of New Jersey, Civil Action No. 1:19-cv-14766-RMB-JBC. Deposition in 2025.

Representing Plaintiffs in matters regarding contamination of groundwater, wastewater, soil, and air with per- and poly-fluoroalkyl substances.

In Re Edmond Asher, et al., vs. RTX Corporation (f/k/a Raytheon Technologies Corporation, et al.) in the County of Huntington Superior Court, Indiana, Cause number 35D01-2006-CT-000338. Deposition in 2024. Representing Plaintiffs in matters regarding contamination of groundwater and soil vapor with trichlorethylene.

In Re Wright vs Consolidated Rail Corporation In the Circuit Court of Cook County, Illinois, Case No: 21L3966.

Deposition in 2023, Representing Plaintiff in matters involving groundwater and drinking water contamination of perchloroethylene, trichlorethylene, 1,2-dichloroethane, and carbon tetrachloride.

In Re Behr Dayton Thermal Products LLC In the United States District Court for the Southern District of Ohio Western Division at Dayton, Case No: 08-cv-326. Deposition in 2022. Representing Plaintiff in matters regarding contamination of groundwater and indoor air with perchloroethylene and trichloethelene.

Orange County Water District vs. Sabic Innovative Plastics US, LLC, et al. In the Court of Appeal, Fourth District, 115

Page 463 of 9818 ends

Division 1, California, Case No: D070553. Deposition in 2020. Representing Plaintiff in matters involving compliance with The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA).

Los Angeles Waterkeeper vs. AAA Plating and Inspection, Inc. In the United States District Court for the Central District of California, Case No: No. CV 18-5916 PA (GJSx). Deposition in 2019. Expert witness representing Plaintiff in matters involving contaminated stormwater runoff at an industrial facility in Compton, California.

Californians for Alternatives to Toxics vs. Schneider Dock and Intermodal Facility. In the United States District Court for the Northern District of California, Case No: 3:17-cv-05287-JST. Deposition in 2019. Expert witness representing Plaintiff in matters involving contaminated stormwater runoff at an industrial facility in Eureka, California.

Bells et al. vs. The 3M Company et al. In the United States District Court for the District of Colorado, Case No: 1:16-CV-02531-RBJ. Deposition in 2018. Expert witness representing Plaintiff on matters regarding the general hydrogeological conditions present in an area impacted by per- and poly-fluoroalkyl substances.

Ungar vs. Foundation for Affordable Housing. In the Superior Court, State of California, Los Angeles County, Case No.

BC628890 Deposition in 2017. Expert witness representing defendant on matters involving alleged drinking water contamination.

Invited Testimony, Reports, Papers and Presentations:

Hagemann, M.F., 2008. Disclosure of Hazardous Waste Issues under CEQA. Presentation to the Public Environmental Law Conference, Eugene, Oregon.

Hagemann, M.F., 2008. Disclosure of Hazardous Waste Issues under CEQA. Invited presentation to U.S.EPA Region 9, San Francisco, California.

Hagemann, M.F., 2005. Use of Electronic Databases in Environmental Regulation, Policy Making andPublic Participation. Brownfields 2005, Denver, Coloradao.

Hagemann, M.F., 2004. Perchlorate Contamination of the Colorado River and Impacts to Drinking Water in Nevada and the Southwestern U.S. Presentation to a meeting of the American Groundwater Trust, Las Vegas, NV (served on conference organizing committee).

Hagemann, M.F., 2004. Invited testimony to a California Senate committee hearing on air toxins atschools in Southern California, Los Angeles.

Brown, A., Farrow, J., Gray, A. and Hagemann, M., 2004. An Estimate of Costs to Address MTBEReleases from Underground Storage Tanks and the Resulting Impact to Drinking Water Wells. 116

Page 464 of 9818 ends

Presentation to the Ground Water and Environmental Law Conference, National GroundwaterAssociation.

Hagemann, M.F., 2004. Perchlorate Contamination of the Colorado River and Impacts to Drinking Waterin Arizona andthe SouthwesternU.S. Presentationto a meetingoftheAmericanGroundwaterTrust,Phoenix,AZ (served on conference organizing committee).

Hagemann, M.F., 2003. Perchlorate Contamination of the Colorado River and Impacts to Drinking Waterin the Southwestern U.S. Invited presentation to a special committee meeting of the National Academy of Sciences, Irvine, CA.

Hagemann, M.F., 2003. Perchlorate Contamination of the Colorado River. Invited presentation to atribal EPA meeting, Pechanga, CA.

Hagemann, M.F., 2003. Perchlorate Contamination of the Colorado River. Invited presentation to ameeting of tribal representatives, Parker, AZ.

Hagemann, M.F., 2003. Impact of Perchlorate on the Colorado River and Associated Drinking WaterSupplies.

Invited presentation to the Inter-Tribal Meeting, Torres Martinez Tribe.

Hagemann, M.F., 2003. The Emergence of Perchlorate as a Widespread Drinking Water Contaminant.Invited presentation to the U.S. EPA Region 9.

Hagemann, M.F., 2003. A Deductive Approach to the Assessment of Perchlorate Contamination. Invited presentation to the California Assembly Natural Resources Committee.

Hagemann, M.F., 2003. Perchlorate: A Cold War Legacy in Drinking Water. Presentation to a meeting ofthe National Groundwater Association.

Hagemann, M.F., 2002. From Tank to Tap: A Chronology of MTBE in Groundwater. Presentation to ameeting of the National Groundwater Association.

Hagemann, M.F., 2002. A Chronology of MTBE in Groundwater and an Estimate of Costs to AddressImpacts to Groundwater. Presentation to the annual meeting of the Society of EnvironmentalJournalists.

Hagemann, M.F., 2002. An Estimate of the Cost to Address MTBE Contamination in Groundwater(and Who Will Pay). Presentation to a meeting of the National Groundwater Association.

Hagemann, M.F., 2002. An Estimate of Costs to Address MTBE Releases from Underground Storage Tanks and the Resulting Impact to Drinking Water Wells. Presentation to a meeting of the U.S. EPA andState Underground Storage Tank Program managers.

Hagemann, M.F., 2001. From Tank to Tap: A Chronology of MTBE in Groundwater. Unpublishedreport.

Hagemann, M.F., 2001. Estimated Cleanup Cost for MTBE in Groundwater Used as Drinking Water.

Unpublished report.

Hagemann, M.F., 2001. Estimated Costs to Address MTBE Releases from Leaking Underground StorageTanks. 117

Page 465 of 9818 ends

Unpublished report.

Hagemann, M.F., and VanMouwerik, M., 1999. Potential Water Concerns Related to Snowmobile Usage.

Water Resources Division, National Park Service, TechnicalReport.

VanMouwerik, M. and Hagemann, M.F. 1999, Water Quality Concerns Related to Personal WatercraftUsage.

Water Resources Division, National Park Service, Technical Report.

Hagemann, M.F., 1999, Is Dilution the Solution to Pollution in National Parks? The George WrightSociety Biannual Meeting, Asheville, North Carolina.

Hagemann, M.F., 1997, The Potential for MTBE to Contaminate Groundwater. U.S. EPA Superfund Groundwater Technical Forum Annual Meeting, Las Vegas, Nevada.

Hagemann, M.F., and Gill, M., 1996, Impediments to Intrinsic Remediation, Moffett Field Naval AirStation, Conference on Intrinsic Remediation of Chlorinated Hydrocarbons, Salt Lake City.

Hagemann, M.F., Fukunaga, G.L., 1996, The Vulnerability of Groundwater to Anthropogenic Contaminants on the Island of Maui, Hawaii. Hawaii Water Works Association Annual Meeting, Maui,October 1996.

Hagemann, M. F., Fukanaga, G. L., 1996, Ranking Groundwater Vulnerability in Central Oahu, Hawaii. Proceedings, Geographic Information Systems in Environmental Resources Management, Airand Waste Management Association Publication VIP-61.

Hagemann, M.F., 1994. Groundwater Ch ar ac te r i z a t i o n and Cl ean up a t Closing Military Basesin California. Proceedings, California Groundwater Resources Association Meeting.

Hagemann, M.F. and Sabol, M.A., 1993. Role of the U.S. EPA in the High Plains States Groundwater Recharge Demonstration Program. Proceedings, Sixth Biennial Symposium on the Artificial Recharge of Groundwater.

Hagemann, M.F., 1993. U.S. EPA Policy on the Technical Impracticability of the Cleanup of DNAPL-contaminated Groundwater. California Groundwater Resources Association Meeting.

Hagemann, M.F., 1992. Dense Nonaqueous Phase Liquid Contamination of Groundwater: An Ounce of Prevention... Proceedings, Association of Engineering Geologists Annual Meeting, v. 35.

Other Experience:

Selected as subject matter expert for the California Professional Geologist licensing examinations,2009-2011. 118

Page 466 of 9818 ends

Response to Comment Leter A Blum, Collins & Ho LLP
119

Page 467 of 9818 ends

Comment Letter: Blum, Collins & Ho LLP from CASC
Comment 1 (Introduction): The commenter requests that Golden State Environmental Justice Alliance formally requests to be added to the public interest list regarding any subsequent environmental documents, public notices, public hearings, and notices of determination for this project. Send all communications to Golden State Environmental Justice Alliance P.O. Box 79222 Corona, CA 92877.

Response: The commenter and Golden State Environmental Justice Alliance have been added to the Project notification list for this Project.

Comment 2-3 (1.0 Summary): The commenter summarizes Project information, site conditions, land use designations, and discretionary approvals associated with the Project.

Response to comments 2-3: The commenter summarizes Project information, site conditions, land use designations, and discretionary approvals associated with the Project. The summary is acknowledged. The comment does not identify a deficiency in the environmental analysis contained in the IS/MND or provide substantial evidence demonstrating that the Project would result in a significant environmental impact not previously analyzed. Therefore, no revisions to the IS/MND are required. The conclusions of the IS/MND remain unchanged.

Comment 4 (Project Description): The commenter states that the IS/MND does not include a floor plan, building elevations, or conceptual grading plan and does not provide information regarding truck hauling trips associated with soil import/export activities. The commenter contends that an EIR should be prepared to include additional project design information for public review.

Response: The commenter provides no substantial evidence demonstrating that the Project would result in a significant environmental impact not already analyzed in the IS/MND. The IS/MND includes a detailed Project Description sufficient to permit meaningful environmental review and informed decision-making, consistent with CEQA Guidelines Sections 15124 and 15146, and provides a stable project description for purposes of environmental analysis.

As described in Chapter 2.0, Project Description, the IS/MND includes site plans, project characteristics, and operational information necessary to evaluate potential environmental impacts. In addition, grading quantities and earthwork assumptions were incorporated into the technical analyses prepared for the Project. Truck hauling assumptions associated with grading and earthwork were also incorporated into the transportation and air quality analyses, including construction-related trip generation and associated emissions. These studies evaluated potential impacts associated with grading, hauling, air quality emissions, greenhouse gas emissions, noise, transportation, and related environmental topics.

CEQA does not require final engineering-level plans at the time environmental review is prepared.

Rather, CEQA requires sufficient information to evaluate the environmental effects of the proposed Project. The IS/MND satisfies this requirement and provides adequate information to support the environmental analysis and conclusions presented therein.

Accordingly, the comment does not identify substantial evidence supporting a fair argument that the Project may have a significant environmental effect or demonstrate any inadequacy in the environmental analysis. The conclusions of the IS/MND remain unchanged, and no revisions to the IS/MND are required.
120

Page 468 of 9818 ends

Comment 5 (Project Description): The commenter states that the MND does not include a detailed site plan, floor plan, grading plan, or building elevations for the proposed Project. The commenter further states that Figure 2-8 is illegible, omits information from public review, and that the MND fails to disclose earthwork quantities necessary to evaluate import/export hauling activities. The commenter concludes that the MND does not provide adequate information for meaningful public review and that an EIR must be prepared
Response: The commenter provides no substantial evidence demonstrating that the Project would result in a significant environmental impact not adequately analyzed in the IS/MND. The commenter primarily asserts that additional project design information should have been included in the environmental document but does not identify any specific environmental impact that was omitted from analysis as a result.

The IS/MND contains a Project Description sufficient to allow decision makers and the public to understand the characteristics of the Project and evaluate its potential environmental effects. The Project Description identifies the Project location, site acreage, proposed land uses, building area, circulation improvements, access points, operational characteristics, and other information necessary to evaluate environmental impacts. The IS/MND also includes project exhibits depicting the proposed site layout and building configuration.

The commenter asserts that additional plans and earthwork information are necessary to evaluate truck trips associated with grading activities. However, the environmental analyses contained in the IS/MND and supporting technical studies evaluated construction activities, including grading operations, equipment usage, vehicle trips, and associated emissions. The commenter does not identify any error in the assumptions utilized in those analyses or provide evidence demonstrating that different grading quantities would result in new or more severe environmental impacts than those disclosed in the IS/MND.

CEQA requires an environmental document to provide sufficient information and analysis to permit informed decision making and meaningful public participation; it does not require the inclusion of every underlying engineering or entitlement exhibit associated with a development application. The commenter has not demonstrated that the Project Description is inadequate for environmental review purposes or that the omission of additional design-level plans precluded evaluation of any potentially significant environmental effect.

Accordingly, the comment does not identify a deficiency in the environmental analysis or provide substantial evidence supporting preparation of an EIR. The conclusions of the IS/MND remain unchanged, and no revisions to the IS/MND are required.

Comments 6-7 (Project Description): The commenter asserts that the Project requires annexation and preparation of a Municipal Service Review (MSR) pursuant to Government Code Section 56430 et seq. and contends that an EIR is required due to alleged noncompliance with annexation-related requirements.

Response to comments 6-7: The commenter raises issues regarding annexation of the Project site, Municipal Service Review (MSR) requirements, sphere of influence considerations, and related Local Agency Formation Commission (LAFCO) procedures. These matters are separate regulatory and jurisdictional processes governed by applicable state law and administered by the appropriate agencies. While these issues may be considered as part of the Project's entitlement and annexation proceedings, they do not identify a deficiency in the environmental analysis contained in the IS/MND or demonstrate that the Project would result in a significant 121

Page 469 of 9818 ends

environmental impact not previously analyzed. Therefore, no revisions to the IS/MND are required. The conclusions of the IS/MND remain unchanged.

Comment 8 (III. Air Quality, VI. Energy, and VIII. Greenhouse Gas Emissions): The commenter states that APN 8206-027-080 is located within unincorporated Los Angeles County, outside the City’s sphere of influence, and therefore was not accounted for in regional and local planning documents, including the AQMP, RTP/SCS, and General Plan. The commenter further asserts that the proposed warehouse exceeds the maximum floor area ratio identified in the City’s General Plan and zoning regulations and therefore is inconsistent with applicable planning documents.

The commenter concludes that the Project is not accounted for in regional and local plans adopted for purposes of reducing environmental impacts and greenhouse gas emissions and therefore requires preparation of an EIR. The commenter also references the attached SWAPE technical review.

Response: The commenter provides no substantial evidence demonstrating that the Project would result in significant air quality, energy, greenhouse gas, or land use impacts beyond those analyzed in the IS/MND. The commenter’s assertions regarding consistency with regional and local planning documents do not alter the environmental analyses contained in the IS/MND.

The assertion that the Project exceeds the maximum permitted floor area ratio (FAR) is incorrect.

As described in the Project Description, the Project site contains approximately 281,705.75 square feet. Applying the maximum permitted FAR of 0.50 results in a maximum allowable building area of approximately 140,853 square feet. The proposed Project includes approximately 140,720 square feet of building area, consisting of a 135,720-square-foot warehouse and a 5,000- square-foot mezzanine, resulting in an FAR of approximately 0.4995. Accordingly, the Project is consistent with applicable development standards, and the commenter’s assertion is unsupported.

The commenter’s assertions regarding regional planning consistency, annexation status, and sphere of influence considerations do not identify any physical environmental impact that was omitted from the IS/MND. The environmental analyses appropriately evaluate the Project’s air quality, greenhouse gas emissions, energy use, and related environmental effects based on the Project Description and reasonably foreseeable development scenario.

The commenter also references a technical review prepared by SWAPE regarding air quality, energy, and greenhouse gas emissions. Responses to the specific technical comments raised by SWAPE are provided in Responses 8A through 8H below. As discussed therein, the comments do not identify any significant environmental impacts omitted from analysis and do not demonstrate that the conclusions of the IS/MND are incorrect.

Accordingly, the conclusions of the IS/MND remain unchanged, preparation of an EIR is not warranted, and no revisions to the IS/MND are required.

Comment 8A (Air Quality): The commenter states that the IS/MND fails to adequately evaluate the Project's air quality and health risk impacts and contends that the Project's emissions and associated health risks may be underestimated. The commenter asserts that an Environmental Impact Report (EIR) should be prepared to more thoroughly evaluate and mitigate potential air quality and health impacts associated with construction and operation of the proposed warehouse project.

Response: The Project's air quality, greenhouse gas, energy, and health risk impacts were evaluated in the Air Quality and Greenhouse Gas Assessment (Appendix A) and Health Risk Assessment (Appendix B), prepared using accepted methodologies, applicable regulatory guidance, and substantial evidence. The commenter does not identify any specific analytical error 122

Page 470 of 9818 ends

or demonstrate that the Project would result in significant impacts beyond those identified in the IS/MND. Accordingly, the conclusions of the IS/MND remain unchanged.

Comment 8B (Air Quality Modeling Assumptions): The commenter contends that the CalEEMod analysis relies on unsupported or incorrect modeling assumptions, including assumptions regarding material import and export quantities, architectural coating emission factors, hauling trip lengths, and operational energy use. The commenter asserts that these assumptions are not adequately supported by the IS/MND and may underestimate Project emissions, including construction-related VOC emissions. The commenter further presents an alternative emissions analysis and concludes that construction VOC emissions may exceed applicable SCAQMD significance thresholds.

Response: The Air Quality and Greenhouse Gas Assessment was prepared using accepted methodologies, project-specific information, and professional judgment. The assumptions utilized in the analysis were selected based on the Project Description and information available at the time the analysis was prepared. The commenter disagrees with certain modeling assumptions and presents alternative assumptions that result in different emissions estimates. However, differences in modeling assumptions and professional judgment do not, by themselves, demonstrate that the IS/MND's analysis is unsupported or inaccurate.

The commenter has not demonstrated that the assumptions utilized in the Air Quality and Greenhouse Gas Assessment are unreasonable or inconsistent with accepted modeling practices, nor has the commenter demonstrated that the Project would result in significant impacts beyond those identified in the IS/MND. Accordingly, the conclusions of the IS/MND remain unchanged.

Comment 8C (Warehouse Operations/Refrigerated Warehouse Assumptions): The commenter asserts that the Project's operational characteristics may differ from those assumed in the IS/MND and suggests that alternative warehouse operational scenarios could result in greater emissions than disclosed.

Response: The Project has been analyzed based on the Project Description and reasonably foreseeable operational characteristics. The commenter provides no substantial evidence that refrigerated warehouse operations are part of the proposed Project or reasonably foreseeable future use. CEQA does not require analysis of speculative operational scenarios based on unknown future tenants.

Comment 8D (Construction Schedule and Modeling Inputs): The commenter challenges construction-related assumptions used in the CalEEMod analysis, including hauling trip lengths and other construction activity inputs used to estimate emissions. The commenter contends that these assumptions may underestimate construction-related emissions and affect the significance conclusions presented in the IS/MND.

Response: The construction assumptions utilized in the Air Quality and Greenhouse Gas Assessment were developed using Project-specific information and professional judgment regarding anticipated construction activities, sequencing, and duration. The commenter provides alternative assumptions but does not demonstrate that the assumptions utilized in the IS/MND are unreasonable or inconsistent with accepted modeling practices. Nor does the commenter provide substantial evidence demonstrating that use of alternative assumptions would result in significant environmental impacts not identified in the IS/MND. Accordingly, the conclusions of the IS/MND remain unchanged.

Comment 8E (Construction Equipment Assumptions): The commenter asserts that diesel particulate matter (DPM) emissions associated with Project construction and operation have not been adequately evaluated. The commenter contends that reliance on localized significance 123

Page 471 of 9818 ends

threshold analyses is insufficient and that a project-specific health risk assessment should have been prepared to evaluate potential cancer and non-cancer health risks to nearby sensitive receptors.

Response: The commenter’s statements regarding diesel particulate matter emissions and associated health risk impacts are acknowledged. Potential health risks associated with Project construction and operation were evaluated using accepted methodologies and applicable regulatory guidance. The analysis concluded that Project-related health risk impacts would be less than significant. The commenter presents an alternative interpretation regarding the level of analysis that should be conducted but does not provide substantial evidence demonstrating that the methodologies used in the IS/MND are inconsistent with applicable guidance or that the Project would result in significant health risk impacts not identified in the environmental document.

Accordingly, the conclusions of the IS/MND remain unchanged.

Comment 8F (Architectural Coatings and VOC Emissions): The commenter asserts that reductions to architectural coating emission factors are unsupported and may underestimate construction-related VOC emissions. The commenter contends that reliance on Rule 1113- compliant coatings should be formally incorporated into Project requirements and that the analysis may understate air quality impacts.

Response: The emissions analysis utilized assumptions consistent with applicable SCAQMD requirements, including Rule 1113. The commenter provides no evidence demonstrating that the assumptions utilized in the analysis are inconsistent with applicable regulations or that the resulting emissions estimates are inaccurate. Nor does the commenter demonstrate that use of alternative coating assumptions would result in significant impacts not identified in the IS/MND.

Therefore, the conclusions of the IS/MND remain unchanged.

Comment 8G (Alternative Emissions Analysis and Significance Conclusions): The commenter presents an alternative emissions analysis and concludes that construction VOC emissions may exceed applicable SCAQMD significance thresholds. The commenter recommends preparation of an EIR and implementation of additional air quality mitigation measures.

Response: The commenter’s alternative analysis is based on different assumptions selected by the commenter and reflects a difference of professional opinion regarding model inputs. CEQA Guidelines Section 15151 recognizes that disagreement among experts does not render an environmental document inadequate. The Project's air quality analysis was prepared using accepted methodologies, Project-specific information, and professional judgment. The commenter has not demonstrated that the assumptions utilized in the IS/MND are unsupported or that the Project would result in significant air quality impacts beyond those identified in the environmental analysis. Accordingly, the conclusions of the IS/MND remain unchanged.

Comment 8H (Environmental Justice and Health Risk Impacts): The commenter discusses environmental justice concerns, cumulative pollution burdens, CalEnviroScreen indicators, warehouse-related health effects, and screening-level health risk analyses. The commenter asserts that the Project may contribute to disproportionate impacts on nearby disadvantaged communities and recommends preparation of an EIR, additional health risk evaluation, and implementation of further mitigation measures.

Response: The IS/MND evaluated the Project's potential air quality, greenhouse gas, health risk, transportation, noise, and other environmental impacts pursuant to CEQA. As documented in the IS/MND and supporting technical studies, Project impacts would be less than significant or mitigated to less-than-significant levels. The commenter does not identify any significant impact omitted from analysis or provide substantial evidence demonstrating that the Project would result in disproportionate environmental effects beyond those evaluated in the IS/MND. While the 124

Page 472 of 9818 ends

commenter cites generalized studies and regional conditions, CEQA requires evaluation of the environmental impacts associated with the Project itself. The commenter has not demonstrated that the Project would result in significant environmental justice-related impacts requiring preparation of an EIR. Accordingly, the conclusions of the IS/MND remain unchanged.

Comment 9 (III. Air Quality, VI. Energy, and VIII. Greenhouse Gas Emissions): The commenter states that the IS/MND does not include analysis of environmental justice issues, including cumulative impacts, and asserts that this conflicts with CEQA Guidelines Section 15131(c). The commenter further states that consideration of environmental justice issues is particularly important because the surrounding community is highly burdened by existing sources of pollution.

Response: The IS/MND evaluates the Project’s potential environmental impacts, including cumulative impacts, in accordance with CEQA using applicable significance thresholds and methodologies for each environmental resource area, including air quality, greenhouse gas emissions, transportation, noise, hazards, and related topics.

CEQA Guidelines Section 15131 addresses economic and social effects in the context of EIR decision-making and provides that such effects do not constitute environmental impacts under CEQA unless they result in physical environmental changes. The IS/MND evaluates physical environmental impacts of the Project consistent with CEQA requirements and does not treat social or economic conditions as standalone environmental impacts.

The commenter does not identify any specific physical environmental impact omitted from analysis or provide substantial evidence demonstrating that the conclusions of the IS/MND are incorrect. While the commenter references cumulative environmental burdens and environmental justice considerations, these issues are addressed through the IS/MND’s cumulative impact analyses and the evaluation of each environmental resource area.

Accordingly, the conclusions of the IS/MND remain unchanged, preparation of an EIR is not warranted, and no revisions to the IS/MND are required.

Comment 10 (III. Air Quality, VI. Energy, and VIII. Greenhouse Gas Emissions): The commenter states that the Project census tract ranks highly for pollution burden and several air quality indicators, including ozone, PM2.5, diesel particulate matter, and traffic-related pollution, according to CalEnviroScreen. The commenter asserts that these conditions demonstrate that the surrounding community is already affected by significant pollution sources.

Response: The commenter provides information regarding existing environmental conditions and community characteristics within the Project area, including CalEnviroScreen indicators and related environmental data. The City acknowledges these existing conditions and considered the Project's potential contribution to environmental impacts through the analyses contained in the IS/MND and supporting technical studies. However, the commenter does not identify a Project-related impact omitted from analysis or provide substantial evidence demonstrating that the Project would result in significant impacts beyond those evaluated in the IS/MND. Therefore, no revisions to the IS/MND are required. The conclusions of the IS/MND remain unchanged.

Comment 11 (III. Air Quality, VI. Energy, and VIII. Greenhouse Gas Emissions): The commenter states that the Project census tract ranks in the 85th percentile for toxic releases and that nearby residents may be exposed to contaminants associated with facilities that emit toxic substances.

The commenter further states that the census tract bears greater impacts from cleanup sites than most areas within California.

Response: The commenter provides information regarding existing environmental conditions and community characteristics within the Project area, including CalEnviroScreen indicators and related environmental data. The City acknowledges these existing conditions and considered the 125

Page 473 of 9818 ends

Project's potential contribution to environmental impacts through the analyses contained in the IS/MND and supporting technical studies. However, the commenter does not identify a Project-related impact omitted from analysis or provide substantial evidence demonstrating that the Project would result in significant impacts beyond those evaluated in the IS/MND. Therefore, no revisions to the IS/MND are required. The conclusions of the IS/MND remain unchanged.

Comment 12 (III. Air Quality, VI. Energy, and VIII. Greenhouse Gas Emissions): The commenter states that the Project census tract ranks highly for groundwater threats and drinking water impacts according to CalEnviroScreen and asserts that nearby communities may already be exposed to environmental contaminants.

Response: The commenter provides information regarding existing environmental conditions and community characteristics within the Project area, including CalEnviroScreen indicators and related environmental data. The City acknowledges these existing conditions and considered the Project's potential contribution to environmental impacts through the analyses contained in the IS/MND and supporting technical studies. However, the commenter does not identify a Project-related impact omitted from analysis or provide substantial evidence demonstrating that the Project would result in significant impacts beyond those evaluated in the IS/MND. Therefore, no revisions to the IS/MND are required. The conclusions of the IS/MND remain unchanged.

Comment 13 (III. Air Quality, VI. Energy, and VIII. Greenhouse Gas Emissions): The commenter states that the Project census tract ranks in the 92nd percentile for solid waste facility impacts and the 100th percentile for hazardous waste facility impacts according to CalEnviroScreen. The commenter asserts that solid waste facilities and hazardous waste generators may expose nearby populations to environmental contaminants and health risks.

Response: The commenter provides information regarding existing environmental conditions and community characteristics within the Project area, including CalEnviroScreen indicators and related environmental data. The City acknowledges these existing conditions and considered the Project's potential contribution to environmental impacts through the analyses contained in the IS/MND and supporting technical studies. However, the commenter does not identify a Project-related impact omitted from analysis or provide substantial evidence demonstrating that the Project would result in significant impacts beyond those evaluated in the IS/MND. Therefore, no revisions to the IS/MND are required. The conclusions of the IS/MND remain unchanged.

Comment 14 (III. Air Quality, VI. Energy, and VIII. Greenhouse Gas Emissions): The commenter states that the surrounding community consists largely of Hispanic and Asian-American residents and includes high rates of poverty, low educational attainment, and linguistic isolation. The commenter asserts that these demographic characteristics make the surrounding population particularly vulnerable to environmental impacts.

Response: The commenter provides demographic and socioeconomic information regarding the surrounding community and asserts that certain populations may be more vulnerable to environmental conditions. The commenter, however, does not identify any specific environmental impact associated with Project construction or operation that was omitted from analysis in the IS/MND. CEQA requires evaluation of a project's physical environmental impacts. The IS/MND evaluates the Project's potential impacts related to air quality, greenhouse gas emissions, health risks, transportation, noise, hazards, and other environmental issue areas using accepted methodologies and applicable significance thresholds. The commenter provides no substantial evidence demonstrating that the Project would result in significant environmental impacts beyond those evaluated in the IS/MND. Accordingly, the conclusions of the IS/MND remain unchanged and no revisions are required.
126

Page 474 of 9818 ends

Comment 15 (III. Air Quality, VI. Energy, and VIII. Greenhouse Gas Emissions): The commenter states that the Project site is located within a SCAG Priority Equity Community and that the Project census tract and adjacent census tracts are designated SB 535 Disadvantaged Communities.

The commenter contends that cumulative industrial development has disproportionately affected these communities and asserts that an EIR is required to evaluate environmental justice impacts, cumulative impacts, and irreversible environmental effects.

Response: The commenter notes that the Project site is located within a Priority Equity Community and that nearby census tracts are identified as SB 535 Disadvantaged Communities.

While these designations provide information regarding community characteristics and existing environmental conditions, they do not establish that the Project would result in significant environmental impacts. The IS/MND evaluates the Project's potential environmental impacts, including cumulative impacts, in accordance with CEQA. As documented in the IS/MND and supporting technical studies, Project impacts would be less than significant or mitigated to less-than-significant levels. The commenter does not identify any significant environmental impact omitted from analysis or provide substantial evidence demonstrating that the Project would result in disproportionate environmental effects beyond those evaluated in the IS/MND. Accordingly, the conclusions of the IS/MND remain unchanged, no revisions to the IS/MND are required, and preparation of an EIR is not warranted.

Comment 16 (III. Air Quality, VI. Energy, and VIII. Greenhouse Gas Emissions): The commenter states that the California Energy Code and California Green Building Standards Code are applicable state plans for renewable energy and energy efficiency and asserts that the Project's energy analysis is inadequate because CalEEMod is not an approved Title 24 compliance software program. The commenter contends that the Project's energy impacts and fuel consumption may therefore be understated.

Response: The commenter incorrectly conflates CEQA energy impact analysis with Title 24 building energy compliance modeling. The purpose of the Energy section of the IS/MND is to evaluate whether the Project would result in wasteful, inefficient, or unnecessary consumption of energy resources or conflict with applicable plans for renewable energy or energy efficiency pursuant to CEQA Guidelines Appendix G. CalEEMod is a widely accepted and commonly utilized model for estimating operational energy consumption and associated greenhouse gas emissions for CEQA analysis purposes.

Title 24 compliance is demonstrated through the building permit and plan check process using approved compliance methodologies and software required by applicable building regulations.

CEQA does not require preparation of Title 24 compliance documentation as part of an IS/MND.

The commenter provides no substantial evidence demonstrating that the methodologies utilized in the IS/MND are inconsistent with CEQA requirements or that the Project's energy impacts were inaccurately evaluated. Accordingly, the conclusions of the IS/MND remain unchanged and no revisions to the IS/MND are required.

Comment 17 (III. Air Quality, VI. Energy, and VIII. Greenhouse Gas Emissions): The commenter states that Project modeling using one of the State-approved Title 24 compliance software programs is required to demonstrate compliance with Title 24 and that CalEEMod is not an approved substitute for Title 24 compliance modeling. The commenter contends that the MND has not provided substantial evidence demonstrating compliance with Title 24 and therefore an EIR must be prepared.

Response: The commenter incorrectly assumes that CEQA requires preparation of Title 24 compliance documentation as part of the environmental review process. The purpose of the Energy analysis contained in the IS/MND is to evaluate whether the Project would result in wasteful, inefficient, or unnecessary consumption of energy resources or conflict with applicable 127

Page 475 of 9818 ends

plans for renewable energy or energy efficiency pursuant to CEQA Guidelines Appendix G. The Energy analysis was prepared using accepted methodologies and provides substantial evidence supporting the conclusions presented in the IS/MND.

Compliance with Title 24 Building Energy Efficiency Standards is demonstrated through the building permit and plan check process and is verified by the applicable building official prior to issuance of building permits. The commenter provides no authority establishing that CEQA requires submission of Title 24 compliance modeling as part of an IS/MND, nor does the commenter provide substantial evidence demonstrating that the Project would fail to comply with applicable building energy efficiency standards.

Furthermore, the commenter does not identify any significant energy impact omitted from analysis or demonstrate that use of a particular Title 24 compliance software program would alter the conclusions of the Energy analysis contained in the IS/MND. Accordingly, the conclusions of the IS/MND remain unchanged, no revisions to the IS/MND are required, and preparation of an EIR is not warranted.

Comments 18-19 (XI. Land Use and Planning): The commenter contends that the MND does not adequately evaluate General Plan buildout conditions, planning consistency, and cumulative warehouse development within the City and asserts that an EIR is required.

Response to comments 18-19: The commenter raises issues related to planning assumptions, growth forecasts, employment projections, regional planning documents, and policy-level considerations. These comments concern land use planning and policy matters that are considered through the City's planning and entitlement processes. The IS/MND evaluates the physical environmental impacts associated with the Project pursuant to CEQA. The commenter does not identify a deficiency in the environmental analysis contained in the IS/MND or provide substantial evidence demonstrating that the Project would result in a significant environmental impact not previously analyzed. Therefore, no revisions to the IS/MND are required. The conclusions of the IS/MND remain unchanged.

Comment 20 (XI. Land Use and Planning): The commenter states that the Project site is not accounted for in regional and local planning documents because APN 8206-027-080 is currently located within unincorporated Los Angeles County and outside the City's sphere of influence. The commenter further asserts that the Project exceeds the maximum floor area ratio (FAR) permitted by the City's General Plan and zoning regulations and therefore is inconsistent with the General Plan, AQMP, and RTP/SCS.

Response: The commenter incorrectly asserts that the Project exceeds the maximum allowable floor area ratio (FAR). As identified in the Project Description, the Project site contains approximately 281,705.75 square feet. Applying the maximum permitted FAR of 0.50 results in a maximum allowable building area of approximately 140,853 square feet. The proposed Project includes approximately 140,720 square feet of building area, consisting of a 135,720-square-foot warehouse footprint and a 5,000-square-foot mezzanine, resulting in an FAR of approximately

0.4995. Accordingly, the Project complies with the applicable FAR requirements.

The commenter further asserts that the Project is not accounted for in regional or local planning documents due to the proposed annexation of APN 8206-027-080. However, the commenter provides no substantial evidence demonstrating that annexation of the Project site would result in significant environmental impacts beyond those analyzed in the MND. The MND evaluates the Project's consistency with applicable planning documents and environmental reduction strategies, and the commenter does not identify any environmental impact omitted from that analysis.

Accordingly, the conclusions of the MND remain unchanged, no revisions are required, and preparation of an EIR is not warranted.
128

Page 476 of 9818 ends

Comments 21-22 (XI. Land Use and Planning): The commenter asserts that the Project is inconsistent with SCAG's 2024-2050 Connect SoCal RTP/SCS and contends that an EIR is required to evaluate those alleged inconsistencies.

Response to comments 21-22: The commenter raises issues related to planning assumptions, growth forecasts, employment projections, regional planning documents, and policy-level considerations. These comments concern land use planning and policy matters that are considered through the City's planning and entitlement processes. The IS/MND evaluates the physical environmental impacts associated with the Project pursuant to CEQA. The commenter does not identify a deficiency in the environmental analysis contained in the IS/MND or provide substantial evidence demonstrating that the Project would result in a significant environmental impact not previously analyzed. Therefore, no revisions to the IS/MND are required. The conclusions of the IS/MND remain unchanged.

Comment 23 (XI. Land Use and Planning): The commenter states that annexation of APN 8206- 027-080 requires preparation of a Municipal Service Review (MSR) and compliance with applicable LAFCO requirements and contends that an EIR is required.

Response: The commenter raises issues regarding annexation of the Project site, Municipal Service Review (MSR) requirements, sphere of influence considerations, and related Local Agency Formation Commission (LAFCO) procedures. These matters are separate regulatory and jurisdictional processes governed by applicable state law and administered by the appropriate agencies. While these issues may be considered as part of the Project's entitlement and annexation proceedings, they do not identify a deficiency in the environmental analysis contained in the IS/MND or demonstrate that the Project would result in a significant environmental impact not previously analyzed. Therefore, no revisions to the IS/MND are required. The conclusions of the IS/MND remain unchanged.

Comment 24 (XIV. Population and Housing): The commenter states that the MND relies on outdated demographic information regarding the City's workforce and does not provide calculations of construction or operational employment. The commenter contends that an EIR must be prepared utilizing more recent census data.

Response: The commenter raises issues related to planning assumptions, growth forecasts, employment projections, regional planning documents, and policy-level considerations. These comments concern land use planning and policy matters that are considered through the City's planning and entitlement processes. The IS/MND evaluates the physical environmental impacts associated with the Project pursuant to CEQA. The commenter does not identify a deficiency in the environmental analysis contained in the IS/MND or provide substantial evidence demonstrating that the Project would result in a significant environmental impact not previously analyzed. Therefore, no revisions to the IS/MND are required. The conclusions of the IS/MND remain unchanged.

Comment 25 (XIV. Population and Housing): The commenter states that the MND does not provide evidence that local workers are interested in or qualified for industrial employment and contends that employees may commute from greater distances, increasing VMT, air quality, and greenhouse gas impacts.

Response: The commenter raises issues concerning workforce characteristics, employment estimates, commute patterns, demographic considerations, and other socioeconomic matters.

These topics provide context regarding potential Project employment and regional labor market conditions; however, they do not, in and of themselves, constitute environmental impacts under CEQA. The commenter does not identify a deficiency in the environmental analysis contained in the IS/MND or provide substantial evidence demonstrating that the Project would result in a 129

Page 477 of 9818 ends

significant environmental impact not previously analyzed. Therefore, no revisions to the IS/MND are required. The conclusions of the IS/MND remain unchanged.

Comments 26-27 (XIV. Population and Housing): The commenter asserts that the MND does not adequately evaluate Project employment generation, worker demographics, commute patterns, and consistency with regional growth forecasts and contends that an EIR is required.

Response to comments 26-27: The commenter raises issues related to planning assumptions, growth forecasts, employment projections, regional planning documents, and policy-level considerations. These comments concern land use planning and policy matters that are considered through the City's planning and entitlement processes. The IS/MND evaluates the physical environmental impacts associated with the Project pursuant to CEQA. The commenter does not identify a deficiency in the environmental analysis contained in the IS/MND or provide substantial evidence demonstrating that the Project would result in a significant environmental impact not previously analyzed. Therefore, no revisions to the IS/MND are required. The conclusions of the IS/MND remain unchanged.

Comment 28 (XIV. Population and Housing): The commenter states that application of SCAG employment density factors results in approximately 109 Project employees and contends that an EIR is required to evaluate the resulting population and employment growth.

Response: The commenter raises issues concerning workforce characteristics, employment estimates, commute patterns, demographic considerations, and other socioeconomic matters.

These topics provide context regarding potential Project employment and regional labor market conditions; however, they do not, in and of themselves, constitute environmental impacts under CEQA. The commenter does not identify a deficiency in the environmental analysis contained in the IS/MND or provide substantial evidence demonstrating that the Project would result in a significant environmental impact not previously analyzed. Therefore, no revisions to the IS/MND are required. The conclusions of the IS/MND remain unchanged.

Comments 29-30 (XIV. Population and Housing): The commenter contends that Project employment generation and annexation-related growth exceed regional employment forecasts and require additional environmental analysis.

Response to comments 29-30: The commenter raises issues related to planning assumptions, growth forecasts, employment projections, regional planning documents, and policy-level considerations. These comments concern land use planning and policy matters that are considered through the City's planning and entitlement processes. The IS/MND evaluates the physical environmental impacts associated with the Project pursuant to CEQA. The commenter does not identify a deficiency in the environmental analysis contained in the IS/MND or provide substantial evidence demonstrating that the Project would result in a significant environmental impact not previously analyzed. Therefore, no revisions to the IS/MND are required. The conclusions of the IS/MND remain unchanged.

Comment 31 (XV. Public Services and XIX. Utilities and Service Systems): The commenter states that the MND does not provide information regarding Municipal Service Review (MSR) requirements associated with annexation of APN 8206-027-080 into the City of Industry and contends that an EIR is required because the Project allegedly does not comply with Government Code Section 56430 et seq.

Response: The commenter raises issues regarding annexation of the Project site, Municipal Service Review (MSR) requirements, sphere of influence considerations, and related Local Agency Formation Commission (LAFCO) procedures. These matters are separate regulatory and jurisdictional processes governed by applicable state law and administered by the appropriate agencies. While these issues may be considered as part of the Project's entitlement and 130

Page 478 of 9818 ends

annexation proceedings, they do not identify a deficiency in the environmental analysis contained in the IS/MND or demonstrate that the Project would result in a significant environmental impact not previously analyzed. Therefore, no revisions to the IS/MND are required. The conclusions of the IS/MND remain unchanged.

Comment 32 (XVII. Transportation/Traffic): The commenter states that the Project was improperly screened from preparing a project-specific Vehicle Miles Traveled (VMT) analysis because the Project is located within a Transit Priority Area (TPA) and a Low VMT Area. The commenter asserts that reliance on the City's screening criteria is inappropriate and understates the Project's transportation impacts.

Response: The Project’s transportation analysis was conducted in accordance with CEQA Guidelines Section 15064.3, which establishes VMT as the primary metric for assessing transportation impacts, and in accordance with the City’s adopted Transportation Study Guidelines, which implement VMT screening criteria consistent with CEQA.

Under these guidelines, projects located within designated screening areas, such as Transit Priority Areas (TPAs) or other identified low-VMT areas, may be screened from conducting project-specific VMT analysis where applicable criteria are satisfied. The screening approach is intended to identify projects that do not require additional VMT quantification based on their location and land use characteristics.

The commenter does not identify any project-specific characteristic demonstrating that the adopted screening criteria are inapplicable or that the Project fails to meet the conditions for screening. The commenter further does not provide substantial evidence demonstrating that the Project would generate VMT impacts exceeding applicable significance thresholds.

Mere disagreement with an adopted and widely used VMT screening methodology does not constitute substantial evidence of a significant environmental impact. Accordingly, the conclusions of the IS/MND remain unchanged.

Comment 33 (XVII. Transportation/Traffic): The commenter cites provisions of the City's Transportation Study Guidelines regarding application of the Low VMT Area screening methodology and asserts that additional project-specific analysis is required.

Response: The commenter reproduces language from the City's Transportation Study Guidelines regarding Low VMT Area screening criteria. The Transportation Analysis evaluated the Project in accordance with the applicable screening methodologies and determined that a detailed project-level VMT analysis was not required. The commenter does not provide substantial evidence demonstrating that the methodology was improperly applied or that the Project would result in significant VMT impacts. Accordingly, the conclusions of the MND remain unchanged.

Comment 34 (XVII. Transportation/Traffic): The commenter states that the Project is not a residential or office development and therefore is not eligible to utilize the Low VMT Area screening methodology. The commenter concludes that a project-specific VMT analysis is required.

Response: The commenter incorrectly assumes that Low VMT Area screening is limited exclusively to residential and office projects. As recognized in the City's Transportation Study Guidelines, employment-related land use projects may qualify for screening where the Project can reasonably be expected to generate VMT characteristics similar to existing land uses within the applicable analysis area. The Transportation Analysis evaluated the Project using the City's adopted methodology and concluded that the Project would not result in significant VMT impacts.

The commenter provides no substantial evidence demonstrating that the Project would exceed 131

Page 479 of 9818 ends

applicable VMT thresholds or that the screening methodology was improperly applied.

Accordingly, the conclusions of the MND remain unchanged.

Comment 35-38 (XVII. Transportation/Traffic): The commenter states that the Project is ineligible for Transit Priority Area (TPA) screening because the Project has a floor area ratio less than 0.75, the MND does not demonstrate that transit service has been verified with local providers, and the Project allegedly is inconsistent with the Sustainable Communities Strategy due to the proposed annexation and General Plan Amendment.

Response: The commenter provides no substantial evidence demonstrating that the Project would result in significant VMT impacts. The Transportation Analysis evaluated the applicability of the City's adopted screening criteria and concluded that the Project qualifies for VMT screening based on the characteristics of the Project site and surrounding area. The commenter does not provide evidence demonstrating that transit service assumptions utilized in the analysis are incorrect or that changes in transit service would alter the conclusions of the VMT analysis.

The commenter further asserts that the Project is inconsistent with the Sustainable Communities Strategy because annexation and discretionary land use approvals are required. However, the need for annexation, a General Plan Amendment, or a Zone Change does not establish that a Project is inconsistent with regional planning objectives or that significant transportation impacts would occur. The commenter does not identify any specific VMT impact omitted from analysis or provide substantial evidence demonstrating that the Project would exceed applicable significance thresholds.

Accordingly, the Transportation Analysis provides substantial evidence supporting the conclusion that transportation impacts would be less than significant. No revisions to the MND are required and preparation of an EIR is not warranted.

Comment 39 (XVII. Transportation/Traffic): The commenter states that the VMT Screening Analysis relied on the SGVCOG VMT Tool and asserts that incorrect Project inputs and outdated travel demand model data were utilized.

Response: The commenter disagrees with the methodology and assumptions utilized in the VMT Screening Analysis. However, the commenter does not demonstrate that the methodology employed is inconsistent with applicable CEQA requirements or the City's adopted Transportation Study Guidelines. The Transportation Analysis was prepared using accepted methodologies and data sources available at the time of analysis. The commenter provides no substantial evidence demonstrating that the assumptions utilized materially alter the conclusions of the VMT analysis or result in significant transportation impacts beyond those disclosed in the MND. Accordingly, the conclusions of the MND remain unchanged.

Comment 40 (XVII. Transportation/Traffic): The commenter states that an alternative run of the VMT model indicates that the Project would generate VMT above the City's significance threshold.

Response: The commenter provides an alternative VMT calculation based on assumptions selected by the commenter. Differences in modeling assumptions and methodologies reflect a difference of professional opinion and do not, by themselves, demonstrate that the Transportation Analysis is inadequate. The Transportation Analysis utilized methodologies consistent with the City's adopted VMT screening procedures and concluded that transportation impacts would be less than significant. The commenter has not demonstrated that the assumptions utilized in the Transportation Analysis are unsupported or that the Project would result in significant VMT impacts. Accordingly, the conclusions of the MND remain unchanged.

Comment 41 (XVII. Transportation/Traffic): The commenter states that the Project would result in significant and unavoidable VMT impacts and that an EIR must be prepared. 132

Page 480 of 9818 ends

Response: The commenter provides no substantial evidence demonstrating that the Project would result in significant VMT impacts. The assertion is based upon alternative assumptions and calculations prepared by the commenter rather than deficiencies in the Transportation Analysis itself. As documented in the Transportation Analysis, the Project satisfies the applicable screening criteria and would not result in significant transportation impacts under CEQA. Accordingly, no revisions to the MND are required and preparation of an EIR is not warranted.

Comment 42 (XVII. Transportation/Traffic): The commenter states that truck, trailer, and delivery vehicle activity associated with warehouse operations should be included in the Project's VMT analysis and contends that excluding these trips understates transportation, air quality, and greenhouse gas impacts.

Response: The commenter provides no substantial evidence demonstrating that the Transportation Analysis improperly excluded vehicle trips or otherwise underestimated Project impacts. The Project's transportation, air quality, and greenhouse gas analyses were prepared using accepted methodologies and evaluated the operational characteristics of the proposed warehouse use. The commenter does not demonstrate that inclusion of additional truck, trailer, or delivery vehicle assumptions would result in significant transportation impacts beyond those disclosed in the MND. Accordingly, the conclusions of the MND remain unchanged.

Comment 43-45 (XVII. Transportation/Traffic): The commenter states that the MND does not provide sufficient information regarding truck maneuvering, vehicle circulation, geometric design features, and emergency access. The commenter further contends that the MND improperly relies on future City and Fire Department review rather than providing substantial evidence supporting the less-than-significant impact conclusions.

Response: The commenter provides no substantial evidence demonstrating that the Project would result in hazardous circulation conditions, inadequate emergency access, or transportation impacts beyond those analyzed in the MND. The Project site plan, circulation design, driveway locations, loading areas, and emergency access features were evaluated as part of the Project review process and are subject to review and approval by the City and applicable public agencies, including the Los Angeles County Fire Department.

The commenter speculates that truck maneuvering, parking utilization, or site circulation may create conflicts but does not provide any engineering analysis, vehicle turning study, or other substantial evidence demonstrating that the Project would fail to meet applicable design, circulation, or emergency access requirements. Likewise, the commenter does not identify any specific City or Fire Department standard that the Project would violate.

The MND evaluates transportation and emergency access impacts based on the Project design and applicable regulatory requirements and concludes that impacts would be less than significant.

The commenter has not demonstrated that additional analysis would alter those conclusions.

Accordingly, the conclusions of the MND remain unchanged, no revisions to the MND are required, and preparation of an EIR is not warranted.

Comments 46-47 (XXI. Mandatory Findings of Significance): The commenter contends that the MND does not adequately evaluate cumulative buildout conditions and cumulative warehouse development and asserts that an EIR is required.

Response to comments 46-47: The commenter raises issues related to planning assumptions, growth forecasts, employment projections, regional planning documents, and policy-level considerations. These comments concern land use planning and policy matters that are considered through the City's planning and entitlement processes. The IS/MND evaluates the physical environmental impacts associated with the Project pursuant to CEQA. The commenter does not identify a deficiency in the environmental analysis contained in the IS/MND or provide 133

Page 481 of 9818 ends

substantial evidence demonstrating that the Project would result in a significant environmental impact not previously analyzed. Therefore, no revisions to the IS/MND are required. The conclusions of the IS/MND remain unchanged.

Comment 48 (XXI. Mandatory Findings of Significance): The commenter states that the Project is not accounted for in regional and local planning documents due to the proposed annexation and further asserts that the Project exceeds the maximum permitted floor area ratio (FAR), resulting in inconsistencies with the General Plan, AQMP, and RTP/SCS.

Response: The commenter reiterates arguments previously raised regarding annexation, regional planning consistency, and floor area ratio calculations. Refer to Response to Comment 20. As discussed therein, the Project complies with the applicable FAR requirements and the commenter has not provided substantial evidence demonstrating that the Project would conflict with applicable planning documents in a manner that would result in a significant environmental impact. Accordingly, the conclusions of the MND remain unchanged.

Comments 49-50 (XXI. Mandatory Findings of Significance): The commenter asserts that Project employment generation and annexation-related growth are inconsistent with regional forecasts and require additional environmental review.

Response to comments 49-50: The commenter raises issues related to planning assumptions, growth forecasts, employment projections, regional planning documents, and policy-level considerations. These comments concern land use planning and policy matters that are considered through the City's planning and entitlement processes. The IS/MND evaluates the physical environmental impacts associated with the Project pursuant to CEQA. The commenter does not identify a deficiency in the environmental analysis contained in the IS/MND or provide substantial evidence demonstrating that the Project would result in a significant environmental impact not previously analyzed. Therefore, no revisions to the IS/MND are required. The conclusions of the IS/MND remain unchanged.

Comment 51-52 (XXI. Mandatory Findings of Significance): The commenter states that the Project requires annexation of APN 8206-027-080 and contends that a Municipal Service Review (MSR) is required pursuant to Government Code Section 56430 et seq. The commenter concludes that an EIR must be prepared because the Project allegedly does not comply with statutory annexation requirements.

Response: The commenter raises issues regarding annexation of the Project site, Municipal Service Review (MSR) requirements, sphere of influence considerations, and related Local Agency Formation Commission (LAFCO) procedures. These matters are separate regulatory and jurisdictional processes governed by applicable state law and administered by the appropriate agencies. While these issues may be considered as part of the Project's entitlement and annexation proceedings, they do not identify a deficiency in the environmental analysis contained in the IS/MND or demonstrate that the Project would result in a significant environmental impact not previously analyzed. Therefore, no revisions to the IS/MND are required. The conclusions of the IS/MND remain unchanged.

Comment 53 (Conclusion): The commenter concludes that the MND is inadequate and requests preparation of an EIR. The commenter also requests to receive future notices and communications regarding the Project.
134

Page 482 of 9818 ends

Response: The commenter's request for future Project notices and communications has been noted and will be provided to the City for consideration. The commenter’s request for preparation of an EIR does not identify a deficiency in the environmental analysis contained in the IS/MND or provide substantial evidence of a significant environmental impact not previously analyzed.

Therefore, no revisions to the IS/MND are required. The conclusions of the IS/MND remain unchanged.
135

Page 483 of 9818 ends

Comment Leter B (Email) - Community Advocate, Samuel
Brown
136

Page 484 of 9818 ends

!
"#$

% &' %

(%

)

"
*+$,,-.
/

01 2"%3$453
3"6

.

"
(

7 67
3 0!
"""%3%,
0!
"""%3%8
0!
"""%3
2"

0!
"""%3-
8%(%-

#*9-

%

""807

37 !3

0%:3
38;"-"0!"3

38 9#

;3#1

1 1.

" <=>?@'AB)(!:
-
,

%C#
%6
8-

,
DD

9..C1E1 (8

%" %8
27 :
4FG1E1(8
HIA@;%
9#
5595J5EKL55LKK
# MNOPNQRSTUVWXYZ[XZ\]^_X`[YXY^a bXcdefgYXYh^XVdiVh^XYjV\VWa^]^XYZ[_Z] PMk`ll^aaVePV[XV]mnnPfbZcXopXo RjV[cV`[dcqX]eMVdVjVaZrsV[Xk]ZUVWXm tuvbZcXopXoRjV[cV wxyzz{z|}~{€€{~z }{‚~ƒ„z †€‡‚ ˆ‰Š‹‰Œy‚~‡yŽy‚
}{‚~ƒ„z
†€‡‚‘}’“ˆ”•• –—˜™~‡yx}—š’›œž{~z~‡yƒ„z{{yxŸ†
‚ Œ{{|y
¡|y{Žžxy‡y{~zƒ~‡}–w „¢¢yxx‚}z‡‘££} Ÿ~†¤Š¤’Žz†„z †€‡‚–
Žx~¥zw‡~žyˆ¦•Ÿ~†¤Š¤ ’Žz† y‡Œœ‡€~ƒ¤wxyzz{z|}~{€€{~z˜ wxy€yžž¥¤{€ž~‡‡€¥~z zžy€yƒ~‡yx~œž{~zyz
ž~zx‡‡|y‡
{z|¤ ‡yƒ„z{{yxŸ†
‚ Œ{{|y
¡|y{Žžxy‡y{~z§¨„Ÿ Œ¡©ª¥‡¥y‡
ƒ~‡¤}–w„¢ ¢yxx‚}z‡‘££} Ÿ~†¤Š¤’Žz†„z
†€‡‚–
Žx~¥zw‡~žx~žy
yˆ¦•Ÿ~†¤ Ё¤’Žz†{z¤}{‚~ƒ„z
†€‡‚« ¬¤}{‚€¤~†x
z~y
~¥¤Œ{{|y
¡|y{Žžxy‡y{~zœžy†€¤y
{z{€‡y{Ž ‡ž~‡
ž~zy{z€€†œ€yz{yxŽ{
zž€†¥¥~‡{z|yƒy{‡y‡|†z¤y¤¥‡~¥~€
¥‡~žy‚
‡€†x{z€{|z{ƒ{žyz
{‡ž‘{z
{‡ž‘yz
ž††xy{ŽzŽ{‡~zzyx{¥yž€‡­†{‡{z| ¥‡¥y‡y{~z~ƒyƒ†xx—zŽ{‡~zzyx„¥yž–¥~‡§¨—„–©ª¥†‡€†yz~¤}yx{ƒ~‡z{y —zŽ{‡~zzyxš†yx{‚’ž§¨}—š’©ª‘w†œx{ž–€~†‡ž€}~ €ž{~z‹ˆ®®®€­«‘yz
}—𒝆{
x{z€€ž{~z€ˆ‰®Š•‘ˆ‰®Š‰‘yz
ˆ‰ˆ°®« ¬¤¥‡~¥~€
¥‡~ž{zžx†
€yzz±y{~z‘yŽx~¥zwxyz‘¯z‡yxwxyz’z
z‘ yz
²~z}¤yz|y€€~ž{y
³{¤‡
Žx~¥z~ƒy¥¥‡~±{yx‚Š«•”yž‡€{z~yˆ•®‘”‹® €­†y‡´ƒ~~{z †€‡{yx³y‡¤~†€ yz†ƒyž†‡{z|
{€‡{œ†{~zƒyž{x{‚³{¤y€€~ž{y
‡†žµ x~y
{z|~¥‡y{~z€‘¥y‡µ{z|‘ž{‡ž†xy{~z{¥‡~Žz€‘†{x{‚~
{ƒ{žy{~z€‘yz
‡~y
³y‚ ž¤yz|€«¬¤¥‡~ž€{{zžx†
€’w¡¦‹®Š´®‹”´®¦®‘³¤{ž¤{€ž†‡‡zx‚x~žy
{z’Ž~žy
~ ¶{|¤€‘yz†z{zž~‡¥~‡y
ž~†z{‚~ƒ£~€’z|x€}~†z‚‘yz
¤‡ƒ~‡
{‡žx‚ 137

Page 485 of 9818 ends

!"#

$

%
&

'

(

)
*

LEGEND:
[:] Site Boundary (%) Receptor Locations - • Distance from receptor to Project site boundary (in feet) 138

Page 486 of 9818 ends

!"#$%&'#$(&$))*))&$#*'+,#''#)(&-$'**()".*""/*%+(&$+ (*""/ #%*+0 *'1 2&'#$&345*#"*!#"#'/*%+2&'#$&36%'%''&4+&''7#'#.*'+2.*'#58$"*(*'#&% *$9%&,"+.)'*'*&('#&%&3'(&-$')#'#)"&$*'+,#'#%45&$*+&:#.')*%+(0 #() 139

Page 487 of 9818 ends

! "
# $!

#%&

' (

)

'

#%&*

#%&

+ &

!
&

#%& #

,,-./012345678492/541:7;/1:<4,=>/?5@565A4 B924@530/;C6==2;05:6D7E6?/86F40GA5@ H

!IJ$H

) '

& &
' +&

' 140

Page 488 of 9818 ends

!"#$

%

&
'

'

(

)*&

%

)
+

)*&

)

&
'

%

,

)

,

&
'

---. -/01234052 64748059:2 -7;0<5 =/08>?9?

!"#$

)

)

141

Page 489 of 9818 ends

!"#

$

%

&
'()*

'

+

'

+

&

'()*

'

&

'

'

*

,-./012345067489:8;01<8=>8645?3@60A>B>C0A0>8A0>@ *
)

D
D*

*
)

*

&

&

+
+

&

!"#

&

&

142

Page 490 of 9818 ends

!

"

!

#

$%&'(

)

#* +

, "!

,

!

, -
!

,

./012345.2678921:58:;<=478921:8>?239@768:A4BC=8A93 D74E:;478:8>FG4; $%&'(

)

#

!

)

)

)

#

!

)

)
'

)

!

)

)

$%&'(

•
•
•
•
•
143

Page 491 of 9818 ends

!
"#$
% &'(
)*+,-.
/(+0

1.+2(3
,((

4.050(
6(-7-
4(+0
8' (9
+..+(
5+-5-(,
-+
,(4-0- &'(
+(5-+
,,-003
-(
'
5-+-
-
'(

6.0,
8(+(
(60(
,
' ,,-0
.5(
6(-7-
4(+0
43 (9 &'(
5+(((
-
-+4(,
6(-7-
4(+0
-46(,
8'
-450((
.+2(3 (
-.(
.60
(2,((
-
5-(0
(2+-4(0
,

5.60 '(0'
45 &'(
:1;/<=
0 -
,(>.(03
03*(
,(4-0-
(95-.+(
+?@
+6-+(
6(-
+(0(( 5-(0@
8-+?(+
(3
45@
(+63
-44.3
(95-.+(@
.4.02(
-4- -(+@
(4(+(3
+(5-(
5+-(,.+(@
,
'(
-(>.((
-(,
8'
-450(( '*+,-.
4(+0
'+(+*-
A(.(
5-+-
-
'(
(
8(+(
(60(
,.+ 5-+-
-
'(
'*+,-.
4(+0
+(2(8@
'(
B3
0?
.(
(2,((
-
-0.,(
' ,(4-0-
45 8-.0,
+(4
0(
'
&'(
5+-C(
(D
,.+0
'-+3
.+'(+
8++
4-+(
+-6.
(2+-4(0
+(2(8
, 5.60
,0-.+( &'(
B3
'-.0,
+(>.+(
,,-0
5+(7,(4-0-
'*+,-.
4(+0
2(-@ -45+('(2(
6(-
6(4(
50@
+(074(
+
4--+@
,(5(,(
-2(+'@ ,
(-+(60(
-44.3
--
5+-(,.+(
5+-+
-
3 ,(4-0-
23 &'(
B3 '-.0,
0-
+(>.+(
,0-.+(
-
00 5+-+
,.+0
.(
,
3 ?-8
-4- -(+
-(,
8'
'-+
-5(+-

'(
( &'(
B3
'-.0,
0-
+(>.+(
,0-.+(
-
00 5+-+
,.+0
.(
,
3 ?-8 -4-
-(+
-(,
8'
'-+
-5(+-

'(
(

#

E
F

$$ &'(
GH/I
,
)3,+-0-3
J(5-+
-.
++-803
-
(((+
,+(

0.0-
, ,-
-
3 BKHLD
6+-,(+
(2+-4(0
,0-.+(
-60- &'(
'3,+-0-3
,-.4(
5+4+03
(45
-
,(4-+(
'
5-7,(2(0-54(
5(?
0-8 ,-
-
(9((,
5+(7,(2(0-54(
-,- &'
03 .(
6(.(
BKHL
+(>.+(
(20.-
-
6+-,(+
(2+-4(0 45
-(,
8'
5-00.(,
+.-@
,.+0
-+48(+
-4@
+.?
3+,
+.-@ 0--,@
8(+
>.03
,(+,-@
.4.02(
8(+'(,
45@
,
+((,
5-00. 0-,
-(,
8'
8+('-.(
-5(+-
&'(
B3
-
+(03
-0(03
-
5(?
0-8 0.0-
8'0(
-+
'(
6+-,(+
(2+-4(0
-(>.((
-(,
8'
(95,(, ,.+0
'+,5(
,
8+('-.(
+.0-
+( &'(
5+-C(D
(9(2(
'+,5(@
+.?
+.0-
+(@
0-,
*-(@
,
,.+0 144

Page 492 of 9818 ends

!

"

#

""

"

$ %

""

& '

&

""

& !

()))*
+,-.-/,01.
234-5603
178
9633
23:-;1.
<-703674

" =

"

>

"
>

"

"

"

!

"

#

"

"

#

#

"

#

"

#

"

#

"

!

?

"

""

"
=

=
"

)@*
96174A-6B1B,-7
178
(3C,0.3
D,.34
961;3.38
E71.F4,4
)4 G3H,0,37B
I

>

"

"

=

>

!

"

J
K
!

!

"

#
"

I

•
•
•
•
145

Page 493 of 9818 ends

!

"

#

#

#

$ %

&

#

#
#

&

#

#
'()*+,-./+0-1*+2345467)*,/4085+29-+0)42+*,:77-;04 !

"

#

#%
#

< #

"

%
##

#

#

#

#

&

#

#

%
=

!

#

#

#

#

')()>?86?-8@-25+*;-6*+A505B+0-,C-B+05D- E-;2+8+056*

#

#

#

#

F&GHI$

G#

J
# 146

Page 494 of 9818 ends

!

"

#
$
%&&' ()*+),-). /0-123,

#

" # 4
5 !

"

#
$

6 7

6 8

9 4:

6 ;

;
$

<==>?> $

4 @

A

147

Page 495 of 9818 ends

Response to Comment Leter B Community Advocate, Samuel
Brown
148

Page 496 of 9818 ends

Comment Letter (Email) - Community Advocate, Samuel Brown:

Comment 1 (Introduction): The commenter generally asserts that the Mitigated Negative Declaration (MND) is inadequate, does not fully disclose the Project's environmental impacts, and that an Environmental Impact Report (EIR) should be prepared. The commenter expresses concerns regarding environmental justice, public participation, cumulative impacts, and various environmental issue areas discussed throughout the letter.

Response: The commenter’s general objections to the MND and request for preparation of an EIR are acknowledged. The MND was prepared in accordance with CEQA, the State CEQA Guidelines, and applicable City requirements. The commenter does not provide substantial evidence demonstrating that the Project would result in significant environmental impacts beyond those identified and analyzed in the MND. Responses to the specific issues raised by the commenter are provided below. Accordingly, the conclusions of the MND remain unchanged and preparation of an EIR is not warranted.

Comment 2 (I. Failure to Provide Meaningful Notice, Public Participation, and Language Access):

The commenter asserts that the environmental review process did not provide meaningful notice, public participation opportunities, or adequate language access for surrounding communities. The commenter contends that additional outreach, translation services, and public engagement efforts should have been conducted to ensure meaningful participation by affected community members.

Response: The commenter raises concerns regarding public outreach, language accessibility, and opportunities for public participation. The City recognizes the importance of public involvement in the environmental review process and conducted noticing and circulation of the MND in accordance with CEQA and applicable City requirements. The commenter does not identify a deficiency in the environmental analysis contained in the MND or provide substantial evidence of a significant environmental impact not previously analyzed. Therefore, no revisions to the MND are required. The conclusions of the MND remain unchanged.

Comment 3 (II. Impacts to the Equestrian Community of Avocado Heights): The commenter states that the Project may adversely affect the equestrian community within Avocado Heights through increased industrial activity, traffic, noise, air quality impacts, and changes to community character. The commenter contends that these impacts have not been adequately evaluated.

Response: The commenter's concerns regarding the nearby equestrian community are acknowledged. The MND evaluates the Project's potential impacts related to transportation, air quality, greenhouse gas emissions, noise, public safety, and land use using accepted methodologies and applicable significance thresholds. The commenter does not identify a specific impact to equestrian facilities, equestrian operations, or equestrian users that was omitted from analysis, nor does the commenter provide substantial evidence demonstrating that the Project would result in significant impacts beyond those evaluated in the MND.

To the extent the commenter raises concerns regarding traffic, noise, air quality, and other environmental issues, those topics are addressed in the applicable sections of the MND and further discussed in Responses to Comments 4 through 10 below. Accordingly, the conclusions of the MND remain unchanged, and no revisions to the MND are required.

Comment 4 (III. Cumulative Impacts Analysis Deficiencies): The commenter asserts that the MND does not adequately evaluate cumulative impacts and fails to consider the combined effects of the Project together with existing, approved, proposed, and reasonably foreseeable development projects in the surrounding area. The commenter contends that the cumulative analysis understates the Project's contribution to regional environmental impacts. 149

Page 497 of 9818 ends

Response: The commenter’s concerns regarding cumulative impacts are acknowledged. The MND evaluates cumulative impacts in accordance with CEQA and considers whether the Project's incremental contribution to cumulative environmental effects would be cumulatively considerable.

The commenter does not identify a specific cumulative impact that was omitted from analysis, nor does the commenter provide substantial evidence demonstrating that the Project's contribution to cumulative impacts would be significant.

The MND and supporting technical studies evaluate cumulative impacts for the applicable environmental issue areas, including transportation, air quality, greenhouse gas emissions, noise, public services, utilities, and other resource topics. The commenter has not demonstrated that the cumulative analysis is deficient or that additional cumulative impacts would occur beyond those disclosed in the MND. Accordingly, the conclusions of the MND remain unchanged, and preparation of an EIR is not warranted.

Comment 5 (IV. Air Quality and Greenhouse Gas Emissions Deficiencies): The commenter states that the MND does not adequately evaluate air quality and greenhouse gas emissions associated with Project construction and operation. The commenter contends that the Project may contribute to existing air quality burdens in the surrounding community and may conflict with local and regional greenhouse gas reduction goals.

Response: The commenter’s concerns regarding air quality and greenhouse gas emissions are acknowledged. The MND evaluates Project-related construction and operational emissions using accepted methodologies, applicable regulatory guidance, and recognized significance thresholds.

The Air Quality and Greenhouse Gas analyses conclude that Project emissions would remain below applicable thresholds of significance or would be reduced to less-than-significant levels through implementation of identified mitigation measures.

The commenter does not identify a specific error in the emissions calculations, modeling assumptions, or analytical methodology utilized in the MND. Nor does the commenter provide substantial evidence demonstrating that the Project would result in significant air quality or greenhouse gas impacts beyond those disclosed in the environmental analysis. Accordingly, the conclusions of the MND remain unchanged, and no revisions to the MND are required.

Comment 6 (V. Noise and Vibration Analysis Deficiencies): The commenter asserts that the MND does not adequately evaluate construction and operational noise and vibration impacts and contends that nearby sensitive receptors may be adversely affected by Project-related activities.

Response: The commenter’s concerns regarding noise and vibration are acknowledged. The MND evaluates potential construction and operational noise impacts using accepted methodologies and applicable significance thresholds. The analysis considers the location of nearby sensitive receptors, anticipated construction activities, operational characteristics, and applicable noise standards.

The commenter does not identify any specific deficiency in the noise analysis, nor does the commenter provide substantial evidence demonstrating that Project-related noise or vibration impacts would exceed applicable thresholds of significance. The commenter’s assertions are not supported by technical analysis demonstrating that the conclusions of the MND are incorrect.

Accordingly, the conclusions of the MND remain unchanged, and no revisions to the MND are required.

Comment 7 (VI. Hazardous Materials and Public Safety Impacts): The commenter asserts that the MND does not adequately evaluate potential hazardous materials and public safety impacts associated with Project construction and operation. The commenter contends that nearby 150

Page 498 of 9818 ends

residents and sensitive receptors may be exposed to hazardous conditions and that additional analysis is required.

Response: The commenter’s concerns regarding hazardous materials and public safety are acknowledged. The MND evaluates potential hazards and hazardous materials impacts associated with Project construction and operation, including compliance with applicable federal, state, and local regulations governing the handling, storage, transportation, and disposal of hazardous materials.

The commenter does not identify any specific hazardous material, contamination source, or public safety impact omitted from analysis, nor does the commenter provide substantial evidence demonstrating that the Project would result in significant hazardous materials impacts.

Compliance with applicable regulatory requirements and implementation of Project design features would ensure that impacts remain less than significant. Accordingly, the conclusions of the MND remain unchanged, and no revisions to the MND are required.

Comment 8 (VII. Hydrology and Water Quality Analysis Deficiencies): The commenter states that the MND does not adequately evaluate hydrology and water quality impacts associated with Project construction and operation. The commenter expresses concerns regarding stormwater runoff, water quality degradation, flooding, and impacts to downstream resources.

Response: The commenter’s concerns regarding hydrology and water quality are acknowledged.

The MND evaluates potential impacts related to stormwater runoff, drainage patterns, erosion, sedimentation, water quality, and flood hazards. The analysis concludes that impacts would be less than significant through compliance with applicable regulatory requirements and implementation of required stormwater control measures.

The commenter does not identify any specific hydrology or water quality impact omitted from analysis, nor does the commenter provide substantial evidence demonstrating that the Project would result in significant impacts beyond those disclosed in the MND. Accordingly, the conclusions of the MND remain unchanged, and no revisions to the MND are required.

Comment 9 (VIII. Biological Resources and Urban Heat Island Effects): The commenter asserts that the MND does not adequately evaluate impacts to biological resources and further contends that the Project may contribute to urban heat island effects through removal of vegetation and increased impervious surface coverage.

Response: The commenter’s concerns regarding biological resources and urban heat island effects are acknowledged. The MND evaluates potential impacts to biological resources, including vegetation, wildlife, and habitat resources, in accordance with CEQA and applicable regulatory requirements. The commenter does not identify any special-status species, sensitive habitat, or biological resource impact omitted from analysis, nor does the commenter provide substantial evidence demonstrating that significant biological impacts would occur.

The commenter also raises concerns regarding urban heat island effects. While urban heat island conditions are discussed as part of broader environmental and sustainability considerations, the commenter does not provide substantial evidence demonstrating that the Project would result in a significant environmental impact related to urban heat accumulation beyond those evaluated in the MND. Accordingly, the conclusions of the MND remain unchanged, and no revisions to the MND are required.

Comment 10 (IX. Transportation and Traffic Analysis Deficiencies): The commenter asserts that the MND does not adequately evaluate transportation and traffic impacts associated with Project 151

Page 499 of 9818 ends

construction and operation. The commenter contends that Project-generated traffic may adversely affect local circulation, roadway operations, and surrounding community conditions.

Response: The commenter’s concerns regarding transportation and traffic impacts are acknowledged. The MND evaluates transportation impacts using accepted methodologies and applicable CEQA significance thresholds, including consideration of Project-generated vehicle trips, roadway circulation, access, and operational characteristics. The analysis concludes that transportation impacts would be less than significant.

The commenter does not identify any specific deficiency in the transportation analysis, nor does the commenter provide substantial evidence demonstrating that the Project would result in significant transportation impacts beyond those disclosed in the MND. To the extent the commenter disagrees with the conclusions of the transportation analysis, such disagreement does not constitute substantial evidence that the analysis is inadequate. Accordingly, the conclusions of the MND remain unchanged, and no revisions to the MND are required.

Comment 11 (X. Inadequacy of a Mitigated Negative Declaration): The commenter asserts that the Project may result in significant environmental impacts and contends that the MND is inadequate under CEQA. The commenter argues that substantial evidence supports a fair argument that the Project may have significant environmental effects and therefore an Environmental Impact Report (EIR) should be prepared.

Response: The commenter’s assertion that an EIR is required is acknowledged. The MND was prepared in accordance with CEQA, the State CEQA Guidelines, and applicable City requirements. The environmental analysis contained in the MND, together with the supporting technical studies, evaluates the Project’s potential environmental impacts using accepted methodologies and applicable significance thresholds.

The commenter has not provided substantial evidence demonstrating that the Project would result in significant environmental impacts beyond those identified and analyzed in the MND. As discussed in Responses to Comments 2 through 10, the issues raised by the commenter have been evaluated in the environmental analysis and do not support a fair argument that the Project may result in significant unavoidable environmental impacts. Accordingly, the conclusions of the MND remain unchanged, and preparation of an EIR is not warranted.

Comment 12 (XI. Improper Reliance on a Mitigated Negative Declaration): The commenter asserts that the City has improperly relied upon a Mitigated Negative Declaration rather than preparing an Environmental Impact Report. The commenter contends that the Project may result in significant environmental impacts and that mitigation measures cannot reduce impacts to a less-than-significant level. The commenter concludes that preparation of an EIR is required under CEQA.

Response: The commenter’s assertion that reliance on a Mitigated Negative Declaration is improper is acknowledged. CEQA permits adoption of a Mitigated Negative Declaration when revisions to a project, including mitigation measures agreed to by the applicant, would avoid or reduce potentially significant environmental effects to a less-than-significant level and there is no substantial evidence in light of the whole record that the project, as revised, may have a significant effect on the environment.

The MND identifies potential environmental impacts associated with the Project and includes mitigation measures where appropriate to reduce impacts to less-than-significant levels. The environmental analysis and supporting technical studies provide substantial evidence supporting the conclusion that all impacts would be less than significant with implementation of the identified mitigation measures.
152

Page 500 of 9818 ends

The commenter has not provided substantial evidence demonstrating that mitigation measures are infeasible, ineffective, or insufficient to reduce impacts to a less-than-significant level. Nor has the commenter identified a significant environmental impact that cannot be mitigated through the measures identified in the MND. Accordingly, the City's reliance on a Mitigated Negative Declaration is appropriate under CEQA, the conclusions of the MND remain unchanged, and preparation of an EIR is not warranted.

Comment 13 (XII. Requested Actions): The commenter requests that the City prepare an EIR, extend public review opportunities, provide additional public outreach and language accessibility measures, consider the concerns raised in the comment letter, and ensure that future notices and communications regarding the Project are provided to interested parties.

Response: The commenter’s requests for additional outreach, future notices, consideration of the submitted comments, and preparation of an EIR are acknowledged. The City has considered the comments submitted regarding the Project in accordance with CEQA. The comment does not identify a deficiency in the environmental analysis contained in the MND or provide substantial evidence of a significant environmental impact not previously analyzed. Therefore, no revisions to the MND are required. The conclusions of the MND remain unchanged. 153

Page 501 of 9818 ends

Leter C - City of Industry Project No�fica�on Leter
154

Page 502 of 9818 ends

May 6, 2026
Subject: Project Notification Pursuant to Senate Bill 18 - General Plan Amendment 24-03, Zone Amendment No. 24-09, and Development Plan No. 24-01, 184 South 6th Street and 14436 Valley Boulevard.

To Whom It May Concern,
The City of Industry (City) has received an application for the project referenced above and invites you to consult with the City pursuant to Senate Bill 18 (SB 18). SB 18 went into effect January 1, 2005 and requires local governments to consult with Native American tribes prior to making certain planning decisions and to provide notice to tribes during the planning process. The SB 18 process is summarized below:
• Prior to the adoption or any amendment of a general plan or specific plan, a local government must notify the appropriate tribes (on the contact list maintained by the NAHC) of the opportunity to conduct consultations for the purpose of preserving, or mitigating impacts to, cultural places located on land within the local government’s jurisdiction that is affected by the proposed plan adoption or amendment. Tribes have 90 days from the date on which they receive notification to request consultation, unless a shorter timeframe has been agreed to by the tribe (Government Code Section 65352.3).
• Prior to the adoption or substantial amendment of a general plan or specific plan, a local government must refer the proposed action to those tribes that are on the Native American Heritage Commission (NAHC) contact list and have traditional lands located within the city or county’s jurisdiction. The referral must allow a 45-day comment period (Government Code Section 65352).

Notice must be sent regardless of whether prior consultation has taken place. Such notice does not initiate a new consultation process.
• Local government must send a notice of a public hearing, at least 10 days prior to the hearing, to tribes who have filed a written request for such notice (Government Code Section 65092).

The NAHC provided the City with a contact list for the proposed project, and has identified your tribe as being culturally and traditionally affiliated to the Area of Potential Effect.

The Project site consists of two (2) parcels: Assessor’s Parcel Numbers (APNs) 8206-027-058 and -080, of which APN 8206-027-080 is located in Avocado Heights, an unincorporated portion of Los Angeles County, and requires annexation into the City of Industry. Annexation approval is granted through the City, Los Angeles County, and the Local Agency Formation Commission of the County of Los Angeles (LAFCO). The Project will include a lot tie through a covenant agreement, which will be coordinated with the City’s Engineering Department and included as a condition of approval.

The City’s General Plan land use designation for APN: 8206-027-058 is Employment and the zoning designation is Industrial (M). The County’s General Plan land use designation for APN 8206-027-080 is Light Industrial (IL) and zoned Restricted Heavy Manufacturing (M-1.5). Accordingly, the proposed 15625 Mayor Dave · City of Industry, California 91744 · 626.333.2211 · www.cityofindustry.org 155

Page 503 of 9818 ends

General Plan land use designation for the parcel requiring annexation into the City, is Employment, and the proposed zoning designation is Industrial (M).

If you would like to consult with the City pursuant to SB 18, please respond in writing by 5:00 p.m. on August 4, 2026 to Eduardo Manriquez, Contract Senior Planner, or to Mike Poland, Contract Senior Project Manager at [email protected] or [email protected] or call (626)333-2211. Please include in your request, at a minimum, (1) name, title, and contact information of the tribal representative(s); (2) suggested dates and location of consultation; (3) any preliminary concerns or questions related to the project (optional).

If you do not wish to consult, please provide in writing that you do not wish to consult on the proposed project. If no written response is received by the aforementioned date, it will be assumed that you have declined consultation. If a request for consultation is received by the date above, the City will follow up to set up a date and location for consultation.

Thank you for your consideration on this matter and please do not hesitate to contact me at should you have any questions or need additional information.

Sincerely,
Mike Poland
Eduardo Manriquez
Contract Senior Planner
Mike Poland
Contract Senior Project Manager
156

Page 504 of 9818 ends

Leter D - City of Industry Project No�fica�on to YSMN
157

Page 505 of 9818 ends

May 28, 2026
Eunice Ambriz-Aguilar
Cultural Resource Technician
Yuhaaviatam of San Manuel Nation (YSMN, also known as the San Manuel Band of Mission Indians) Cultural Resource Department
26569 Community Center Dr
Highland, CA 92346
P: 909.864.8933
Subject: General Plan Amendment 24-03, Zone Amendment No. 24-09, and Development Plan No. 24-01 – 184 South 6th Street and 14436 Valley Boulevard.

Dear Eunice Ambriz-Aguilar:

In accordance with the requirements of Public Resources Code (PRC) Section 21080.3.1, CASC Engineering and Consulting, on behalf of the City of Industry, hereby notifies the San Manuel Band of Mission Indians of an initial study that will be prepared for General Plan Amendment 24-03, Zone Amendment No. 24-09, and Development Plan No. 24-01 for a new 140,720 square foot building that will replace 6 existing buildings. Annexation of Assessor’s Parcel Number 8206-027-080 from the County of Los Angeles to the City, located at 184 South 6th Street and 14436 Valley, Industry, CA 91745.

Project Description
The proposed project includes a new 140,720 square-foot building that will replace 6 existing buildings and infrastructure improvements on the Project Site. Annexation of Assessor’s Parcel Number 8206- 027-080 from the County of Los Angeles to the City. Project implementation requires demolition of all existing buildings, structures, and hardscapes.

Your comments regarding decisions, which may affect ancestral tribal sites, are important to the City. If your tribe would like to comment on or consult on the Project, please respond in writing within 30 days of the date of this letter to the following:

City of Industry Planning Division
Attention: Eduardo Manriquez, Contract Senior Planner, or to Mike Poland, Contract Senior Project Manager
Email: [email protected] or [email protected] Phone Number: (626)333-2211.

Address: 15625 Mayor Dave Way City of Industry, CA 91744 In accordance with Public Resources Code section 21080.3.1, subd. Please provide written comments to me within 30 days. Should the City of Industry not receive a response within 30 days, it will be presumed that your tribe has declined consultation. Thank you for your consideration on this matter.

Sincerely,
Eduardo Manriquez
Contract Senior Planner
158

Page 506 of 9818 ends

Comment Leter E (Email) - YSMN (San Manuel Band of
Mission Indians)
159

Page 507 of 9818 ends

!"
#

$%&
!"
'
(
')
*+,
-,
*

'-
./

+%
01/

2+3/
40252!$6-7 89:
;<=>
?@A<=>B<==:<<CDAEF@G $HI

JKLMKLNLO
PQLN
;8 5RD<=
ST:
?UFT:BF<VF9=FEF@GW
X:VV9:

YD-FI<D
?Z[D-FI<DBF<VF9=FEF@G 0\]><D>
8<=D9^:_
?:@<=D9^:_B<==:<<CDAEF@G P
<<FI@:=
`LaP
bYc d-I<<e9<<@
U
f<=
8<=:
g<9=
`df8gh
<V
=i=
<V
I:
f<=
8<=:

Y<=>
U
89VV9=
j=>9<=VcEA>UW klmnlopqr
lsqtru
v
gH
SwjSb
9=V
D
<<FI@:=V
=:VV
T
D:FC=9_:

I:

V:=>:D
<=>
=i
I: F=:=
9V
V<U:E xyz{|
z{}
~€€‚

xƒ„
†‡ˆ‰
Š‹ŒŽ ‰Ž‡‹‘
Š‘‹’‰“”
†Ž•‰‘ –——˜–™š–
›œžŸ
Š ¡¢¡£¤¢¥£¦¢¦§
¨
©ª¥ †«‹ŒŽ¬ŽŽ‰Œ”•‘‹­«£“‹®

¯°±²³
´µ¶·¸¹
º»¼½·¾¿ºÀµ·Á½
ôµ¶·¸¹Äº»¼½·¾ÅÆÂ¶»Â¶µ¹Á¿¶Æ¶ÄÀÇÈÉ ÊËÌͳ
Îϵ½ÆÐÂÑÒ
ÓÂÑ
ÔÕÒ
ÔÖÔ×
ØÙÚÛ
ºÓ ܱ³
´ÐµÂ½ÐÇ
Ó¶½·Ýµ¹¾
ù»Â¶½·Ýµ¹¾Å¶¶¹ÂÁÞÂÀ½ÇµßÄ¸Ç»É àá³
Ó·â¹
ãÇÁ¶Ð
ûßÇÁ¶ÐŶ¶¹ÂÁÞÂÀ½ÇµßĸǻÉä
å½·ÆÞ¹¶
ÎµÇÆÞÇ
Ãå½·ÆÞ¹¶ÄÎµÇÆÞÇÅÆÂ¶»Â¶µ¹Á¿¶Æ¶ÄÀÇÈÉ ÊæçèËáͳ
éêºëÎìíî
´ïÞ¹½¶ÂÁ
´»Â·Áð
ºñòÔ
óǽ
ô¹¶¹½ÂÁ
ãÁ¶
º»¹¶Ð»¹¶Þ
ÔÛ¿ÖÚÒ
õǶ¹
º»¹¶Ð»¹¶Þ
îÇÄ
ÔÛ¿ÖØÒ
¶Рö¹È¹ÁÇß»¹¶Þ
ãÁ¶
îÇÄ
ÔÛ¿Ö÷
ø
÷ÕÛ
ùǵÞÏ
×ÞÏ
ùÞ½¹¹Þ
¶Ð
÷ÛÛÚ×
ÂÁÁ¹Ñ
ñǵÁ¹È½ÐÒ
ê·ÞÑ
Çó
ì¶ÐµÆÞ½Ñ
éêìοìîöë¿ÔÖÔ׿ Úð

ö¹Â½
´ÐµÂ½ÐÇÒ Î϶â
Ñǵ
óǽ
¸Ç¶Þ¸¶À
ÞϹ
µÏÂÂÈ·ÂÞ»
Çó
ù¶
Ó¶µ¹Á
îÂ-Ƕ
ùÓîÒ
ÂÁÆÇ
â¶Ç¶
ÂÆ
ÞϹ
ù¶
Ó¶µ¹Á
ñ¶Ð
Çó Ó·ÆÆ·Ç¶
ì¶Ð·Â¶Æ
½¹À½з¶À
ÞϹ
¼Çȹ
½¹ó¹½¹¶¸¹Ð
߽ǹ¸ÞÄ
ùÓî
Âßß½¹¸·ÂÞ¹Æ
ÞϹ
Çßßǽ޵¶·ÞÑ
ÞÇ
½¹È·¹
ÞϹ
߽ǹ¸Þ
Contract Planner for the City of Industry ([email protected]) 160

Page 508 of 9818 ends

!"
#"$
%&

"
'
()*)()
+

,

-

.

/

/

+)
0 /

,

1 /
2 3.4

,1

)
"

3.4 5

/

/

,66

7 89:
;;< =>
?

,

2 /

@
#

A/
B&

5 @

.
/ ?

@)
C2

/

,

/
B

)
"

3 /
.
4 #3.4&

+A(

A
@

/

D

2 6

/

/

@

+

@

)

E>
?/
@
A

@

!"
#

(%&

+
'

D /

3.4 /

+A()
+

/

,

'
)

F>
?/

/
,

,

2 #

(A/
B
/

@&

.
0 . /

GH%)%

/
/

/

,)
I8J
;;< =>
+
3 /
.

4 #3.4&

KLA(

/

A

,

/

/

@

+

@

)
.

@

@

@

!"
#

(%&

+
'

3.4 5
@

,

' )
+
'

/

3.4 /

/

,

3.4 A)

E>
"

6 /

,
#

)&

L
"
/

3.4)
+
L
"
6 /

3.4 /
/
,)

MNOPQ

RSTUUVWUOUX
NY
ZU[
\U[SP]
MU^N[
_PU]W`Pa
OTUO
OTP_P
XUb
cP
UddW^N[U]
O_WcPa
e]UWXW[f
eS]OS_U]
Ug]WU^N[
ON
OTP
U_PUh TNiPVP_j

RSTUUVWUOUX
NY
ZU[
\U[SP]
MU^N[
eU[
N[]b
akPUl
YN_
WOaP]Ym
nTP
n_WcP
TUa
[N
NcoPe^N[
WY
OTP
UfP[ebj
dPVP]NkP_j U[dpN_
U_eTUPN]NfWaO
iWaTPa
ON
eN[aS]O
iWOT
NOTP_
O_WcPa
W[
UddW^N[
ON
RZ\M
U[d
WY
OTP
qPUd
rfP[eb
iWaTPa
ON
_PVWaP
OTP eN[dW^N[a
ON
_PeNf[W`P
UddW^N[U]
O_WcPam

'

D

@

/

,66

3.4 )
?/

/
5 s

+
"

t
+
#1&

/

'
/

#'u&
/

3.4 ,)

vwxyz{
|}~y€|‚wyƒ„

+ )"
† A) 161

Page 509 of 9818 ends

!"#! $!

A YUHAAVIATAM 'ffl' OF SAN MANUEL NATION
162

Page 510 of 9818 ends

Response to Comment Leter E (Email) - YSMN (San
Manuel Band of Mission Indians)
163

Page 511 of 9818 ends

Comment Letter (Email) - YSMN (San Manuel Band of Mission Indians):

Comment 1 (Project Review and Tribal Interest): The Yuhaaviatam of San Manuel Nation (YSMN) states that the Project is located within Serrano ancestral territory and is therefore of interest to the Tribe. YSMN notes that it has reviewed the Project materials and, based on its current knowledge of the Project area, does not have concerns regarding implementation of the Project as proposed. YSMN requests that specific cultural resource and tribal cultural resource protection measures be incorporated into the Project.

Response: The commenter’s review of the Project and statement that YSMN does not currently have concerns regarding implementation of the Project as proposed are acknowledged. The requested cultural resource and tribal cultural resource protection measures have been reviewed by the City and Project applicant and will be incorporated into the Project as conditions of approval. These measures are consistent with applicable regulatory requirements governing cultural resources and tribal cultural resources. The MND analysis and conclusions remain unchanged.

Comment 2 (Recommended Cultural Resource Mitigation Measures): YSMN requests implementation of cultural resource protection measures requiring work stoppage procedures, archaeological evaluation of discoveries, tribal notification, preparation of monitoring and treatment plans when appropriate, and procedures governing the discovery of human remains.

Response: The commenter’s recommendations regarding inadvertent discovery procedures, archaeological evaluation, tribal notification, treatment plans, and treatment of human remains are acknowledged. These measures will be incorporated into the Project as conditions of approval and are consistent with existing regulatory requirements, including applicable provisions of State law governing archaeological resources and human remains. The MND analysis and conclusions remain unchanged.

Comment 3 (Recommended Tribal Cultural Resource Mitigation Measures): YSMN requests implementation of tribal cultural resource measures requiring notification of YSMN upon discovery of pre-contact cultural resources, preparation of a Cultural Resources Monitoring and Treatment Plan when appropriate, consultation regarding significant discoveries, and provision of archaeological and cultural resource documentation to YSMN.

Response: The commenter’s recommendations regarding tribal cultural resource monitoring, treatment planning, consultation, and information sharing are acknowledged. These measures will be incorporated into the Project as conditions of approval and implemented in coordination with applicable regulatory requirements and standard procedures for the treatment of cultural resources. The MND analysis and conclusions remain unchanged.

Comment 4 (Future Coordination and Project Conditions): YSMN requests the opportunity to review draft and final Project conditions and requests that future communications regarding the Project be provided to designated Tribal representatives.

Response: The commenter’s request for continued coordination, review of applicable Project conditions, and future Project-related communications is acknowledged. The request has been noted. The City will continue coordination with YSMN as appropriate during Project implementation and will provide applicable Project conditions and communications to designated Tribal representatives in accordance with City procedures. The MND analysis and conclusions remain unchanged.
164

Page 512 of 9818 ends

Comment Leter F (Email) - A.S. Public Resource Code Request 165

Page 513 of 9818 ends

From: Adam Salcido
To: Mike Poland
Cc: Executive Director; Assistant Executive Director; Steven Piepkorn; Pete Sheehan; Ramon Amaya; Stanley Saltzman
Subject: [CAUTION External Email] CRP IV Valley Center, LLC Date: Monday, May 25, 2026 8:00:38 AM
Good Morning Mr. Poland,
Please provide any updates to the above mentioned project.

I am requesting under Public Resource Code Section 21092.2 to add the email addresses and mailing address below to the notification list, regarding any subsequent environmental documents, public notices, public hearings, and notices of determination for this project. [email protected]
[email protected]
[email protected]
[email protected]
[email protected]
[email protected]
[email protected]
Mailing Address:

P.O. Box 79222
Corona, CA 92877
Please confirm receipt of this email.

Thank You,
166

Page 514 of 9818 ends

Adam Salcido
167

Page 515 of 9818 ends

Response to Comment Leter F (Email) - A.S. Public Resource Code Request
168

Page 516 of 9818 ends

Comment 1 (Notification List): The commenter requests an update on the Project and requests that several email addresses and a mailing address be added to the notification list for future environmental documents, public notices, public hearings, and notices of determination related to the Project.

Response: The comment has been reviewed. The correspondence requests to be added to the notification list for future environmental documents, public notices, public hearings, and notices of determination related to the Project and requests updates regarding the Project. The comment does not address the adequacy, analysis, or conclusions of the Initial Study/Mitigated Negative Declaration (IS/MND). Accordingly, no revisions to the IS/MND are required in response to this comment.
169

Page 517 of 9818 ends

Comment Leter G (Email) - K.W. Project Opposi�on
170

Page 518 of 9818 ends

From: Karen Worman
To: Planning
Subject: 6th Ave annex and bldg.

Date: Monday, May 25, 2026 9:52:26 AM
Some people who received this message don't often get email from [email protected]. Learn why this is important
I oppose this project as I live on Proctor Ave. It will bring more congestion to the area . Also oppose painting curbs red on Proctor between 5th and 6th. We do not need more buildings in this area. Many vacant bldgs. I grew up here and its sad to see this area overcrowded with buildings.

Thank you
Karen Worman
Yahoo Mail: Search, Organize, Conquer
171

Page 519 of 9818 ends

Response to Comment Leter G (Email) - K.W. Project Opposi�on 172

Page 520 of 9818 ends

Comment 1: The commenter expresses opposition to the proposed Project, citing concerns regarding increased traffic congestion, proposed red curb improvements along Proctor Avenue, the continued development of industrial buildings in the area, and the existence of vacant industrial buildings.

Response: The comment has been reviewed. The commenter expresses concerns regarding potential traffic congestion, proposed curb modifications, and the amount of industrial development in the surrounding area. The comment does not identify any specific deficiencies in the adequacy, analysis, or conclusions of the Initial Study/Mitigated Negative Declaration (IS/MND). Accordingly, no revisions to the IS/MND are required in response to this comment. 173

Page 521 of 9818 ends

CIRCULATION DRAFT
Draft Initial Study and
Mitigated Negative Declaration
CRP IV Valley Center, LLC
184 South 6th Avenue
City of Industry
Lead Agency:

City of Industry
15625 East Stafford Street
City of Industry, CA 91744
(626) 333-2211
Prepared By:

CASC Engineering and Consulting, Inc.
1470 E. Cooley Dr.

Colton, CA 92324
(909) 783-0101
May 6, 2026

Page 522 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 2 ends

TABLE OF CONTENTS
CHAPTER ONE – INTRODUCTION ............................................................................................6

1.1 Purpose and Authority ....................................................................................................6

1.2 Documents Incorporated by Reference..........................................................................6

1.3 Documents Prepared for the Project ..............................................................................6 CHAPTER TWO – ENVIRONMENTAL CHECKLIST ..................................................................7

2.1 Project Summary ............................................................................................................7

1. Project Title:...........................................................................................................................7

2. Lead Agency Name and Address: .........................................................................................7

3. Contact Person and Phone Number:.....................................................................................7

4. Project Location:....................................................................................................................7

5. Project Applicant’s Name and Address: ................................................................................7

6. General Plan Designation:.....................................................................................................7

7. Zoning Designation:...............................................................................................................7

8. Project Description:................................................................................................................8

9. Surrounding Land Uses and Setting:...................................................................................10

10. Other Public Agencies Whose Approval is Required:..........................................................11

11. California Native American Tribes: ......................................................................................11

2.2 Environmental Factors Potentially Affected..................................................................20

2.3 Determination ...............................................................................................................20

2.4 Evaluation of Environmental Impacts ...........................................................................21 CHAPTER THREE – ENVIRONMENTAL IMPACT DISCUSSION ............................................23 I. Aesthetics ................................................................................................................................23 II. Agricultural and Forestry Resources.......................................................................................26 III. Air Quality ..............................................................................................................................29 IV. Biological Resources.............................................................................................................37 V. Cultural Resources.................................................................................................................41 VI. Energy ..................................................................................................................................44 VII. Geology and Soils ................................................................................................................49 VIII. Greenhouse Gas Emissions................................................................................................56 IX. Hazards and Hazardous Materials ........................................................................................60 X. Hydrology and Water Quality .................................................................................................66 XI. Land Use and Planning .........................................................................................................71

Page 523 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 3 ends

XII. Mineral Resources ...............................................................................................................73 XIII. Noise ...................................................................................................................................75 XIV. Population and Housing......................................................................................................80 XV. Public Services ....................................................................................................................82 XVI. Recreation...........................................................................................................................85 XVII. Transportation/Traffic.........................................................................................................87 XVIII. Tribal Cultural Resources .................................................................................................91 XIX. Utilities and Service Systems..............................................................................................95 XX. Wildfire ...............................................................................................................................101 XXI. Mandatory Findings of Significance ..................................................................................104 CHAPTER FOUR – MITIGATION, MONITORING, AND REPORTING PROGRAM (MMRP).106 CHAPTER FIVE– REFERENCES AND PREPARERS............................................................116

5.1 References Cited...............................................................................................................116

5.2 List of Preparers ...............................................................................................................119

Page 524 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 4 ends

APPENDICIES
Appendix A 6th Street Air Quality and Greenhouse Gas Assessment. Urban Crossroads, Inc. December 24, 2025.

Appendix B Geotechnical Due Diligence Exploration Proposed Industrial Warehouse Development, 110 South 6th Avenue City of Industry, Los Angeles County, California. Leighton Consulting, Inc. August 27, 2024.

Appendix C Phase I Environmental Site Assessment (September 18, 2024) & Limited Phase II Subsurface Investigation Report (June 1, 2023). Hillmann Consulting LLC.

Appendix D Hazardous Materials Survey Report, Valley Centre Business Park, Partner Engineering and Science, Inc. July 26, 2024.

Appendix E WQMP Report for Valley Center, David Evans and Associates, Inc. July 2025.

Appendix F Hydrology Report for Valley Center, David Evans and Associates, Inc. July 2025.

Appendix G Noise Impact Study Valley Centre Business Park, Yorke Engineering, LLC.

April 2025.

Appendix H Memorandum VMT Analysis – 184 S. Sixth Avenue. CNC Engineering, January 31, 2025.

Appendix I Will Serve Documents.

FIGURES
Figure 2-1: Regional Map ...........................................................................................................12 Figure 2-2: Project Boundary ......................................................................................................13 Figure 2-3: Assessor’s Parcel Number .......................................................................................14 Figure 2-4: Existing General Plan Land Use...............................................................................15 Figure 2-5: Proposed General Plan Land Use Designation City of Industry...............................16 Figure 2-6: Existing Zoning.........................................................................................................17 Figure 2-7: Proposed Zoning Designation City of Industry .........................................................18 Figure 2-8: Conceptual Site Plan................................................................................................19

Page 525 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 5 ends

TABLES
Table 3-1 Maximum Daily Regional Emissions Thresholds........................................................30 Table 3-2 Localized Significance Emissions Thresholds............................................................30 Table 3-3 Regional Construction Emissions Summary...............................................................34 Table 3-4 Localized Construction Significance Summary...........................................................34 Table 3-5 Total Project Regional Operational Emissions ...........................................................35 Table 3-6 Operational Localized Significance Summary ............................................................35 Table 8-1 Total Project Greenhouse Gas Emissions..................................................................57 Table 8-2 Existing Building GHG Emissions...............................................................................58 Table 8-3 Project Net New GHG Emissions ...............................................................................58 Table 13-1 Estimated Construction Noise Impacts at the Nearest Sensitive Receptor..............77 Table 17-1 Parking Compliance .................................................................................................89 Table 19-1 Multiple Dry Years Supply and Demand Comparison ..............................................98 Table 19-2 Estimated Solid Waste Generation.........................................................................100 Table 22-1 Mitigation Monitoring and Reporting Program ........................................................106

Page 526 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 6 ends

CHAPTER ONE – INTRODUCTION

1.1 Purpose and Authority
This Initial Study/Mitigated Negative Declaration (“IS/MND”) has been prepared in accordance with the California Environmental Quality Act (California Public Resources Code §§ 21000 et seq.) (“CEQA”) to evaluate the potential environmental impacts associated with the implementation of the proposed Valley Centre Business Park located at 184 South 6th Avenue in the City of Industry, California. This document is prepared in conformance with CEQA and the CEQA guidelines (California Code of Regulations, Title 14, § 15000 et seq.). This IS/MND is intended to serve as an informational document for the public agency decision makers and the public regarding the South 6th Avenue Industry Redevelopment.

1.2 Documents Incorporated by Reference
As permitted by Section 15150 of the CEQA Guidelines, this IS/MND references several technical studies and analyses. Information from the documents incorporated by reference is briefly summarized in the appropriate section(s). The relationship between the incorporated part of the referenced document and the IS/MND has also been described. The documents and other sources used in the preparation of this IS/MND include, but are not limited to:
• City of Industry 2014 General Plan (adopted June 12, 2014) • City of Industry General Plan Update Final Environmental Impact Report (June 12, 2014) • City of Industry Municipal Code Chapter 17.16 “Industrial Zone” • Los Angeles County General Plan (updated July 2022)
• Los Angeles County GIS Data Portal and Interactive Map (GIS-NET) • South Coast Air Quality Management District (SCAQMD)
• 2022 Air Quality Management Plan (AQMP) (adopted December 2, 2022)

1.3 Documents Prepared for the Project
As part of the CEQA review process, the lead agency determined that the following stand-alone technical studies be prepared for the Project, and they are appended to the IS/MND as follows:
• Air Quality and Greenhouse Gas Assessment (Appendix A) • Geotechnical Due Diligence Exploration (Appendix B)
• Phase I Environmental Site Assessment & Limited Phase II Subsurface Investigation Report (Appendix C)
• Hazardous Materials Survey Report (Appendix D)
• WQMP Report (Appendix E)
• Hydrology Report (Appendix F)
• Noise Impact Study (Appendix G)
• VMT Analysis (Appendix H)
• Will Serve Documents (Appendix I)

Page 527 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 7 ends

CHAPTER TWO – ENVIRONMENTAL CHECKLIST

2.1 Project Summary

1. Project Title:

CRP IV Valley Center, LLC

2. Lead Agency Name and Address:

City of Industry
15625 Mayor Dave Way
City of Industry, CA 91744

3. Contact Person and Phone Number:

Mike Poland, Contract Senior Project Manager
Eduardo Manriquez, Contract Senior Planner
(626) 333-2211

4. Project Location:
184 South 6th Avenue
City of Industry, CA 91746

5. Project Applicant’s Name and Address:

Rick Goebel
CapRock Partners
1300 Dove Street, Suite 200
Newport Beach, CA 92660

6. General Plan Designation:

APN 8206-027-058: Employment
APN 8206-027-080: Light Industrial (IL) (Los Angeles County)

7. Zoning Designation:

APN 8206-027-058: Industrial (M)
APN 8206-027-080: Restricted Heavy Manufacturing (M-1.5) (Los Angeles County)

Page 528 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 8 ends

8. Project Description:

CapRock Partners (“Applicant”), submitted to the City of Industry (“City”) an application for a Development Plan (“DP”), General Plan Amendment (“GPA”) and Zone Change (“ZC”) for the proposed construction of an industrial warehouse on approximately 6.47 acres of non-vacant land located at 184 South 6th Avenue (S. 6th Ave.) (“Project”) in the northwestern portion of the City (refer to Figure 2-1 Regional Vicinity). The Project site consists of two (2) parcels: Accessor’s Parcel Numbers (APNs) 8206-027-058 and -080.

APN: 8206-027-080 is located in Avocado Heights in unincorporated County of Los Angeles and requires annexation of one parcel (APN 8206-027-080) approval through the Local Agency Formation Commission of the County of Los Angeles (LAFCO) (refer to Figure 2-2 Project Boundary and Figure 2-3 Assessor Parcel Numbers). The Project will include a lot tie through a covenant agreement, which will be coordinated with the City’s Engineering Department and included as a condition of approval. The City’s General Plan land use designation for APN: 8206-027-058 is Employment and the zoning designation is Industrial (M). APN 8206-027-080 is designated Light Industrial (IL) and zoned Restricted Heavy Manufacturing (M-1.5) under the Los Angeles County General Plan and Zoning Code, respectively (refer to Figure 2-4 Existing Land Use Designation and Figure 2-6 Existing Zoning Designations). The proposed General Plan land use designation for the annexed parcel is Employment, and the proposed zoning designation is Industrial (M) (refer to Figure 2-5 Proposed General Plan Land Use Designation City of Industry and Figure 2-7 Proposed Zoning Designation City of Industry). The site is bound by East Valley Boulevard (E. Valley Blvd.) to the northeast, and S. 6th Ave. to the northwest, and is surrounded by warehousing/manufacturing uses.

Existing Conditions
The Project site is currently developed with six (6) buildings totaling 199,840 square feet (sq ft), which are currently used for storage, commercial, warehousing, and parts assembly purposes. The Project site is fully developed with drive aisles, parking spaces and ornamental landscaping, including grass and trees, along the Project and building frontages. Additionally, the site contains the remnants of a previous building foundation located on the eastern portion of the site. Access to the site is provided via two (2) 30- foot-wide driveways off E. Valley Blvd., and two (2) thirty-foot-wide driveways and one twenty-five-foot-wide driveway off S. 6th Avenue. An eight-foot-wide sidewalk with four (4) streetlights is located along the Project frontage on E. Valley Blvd. and concludes at the northwestern portion of the site at the intersection of S. 6 th Avenue. Above-ground
electrical distribution lines are located along the Project frontage on S. 6 th Avenue. Two
(2) fire hydrants are located along the Project frontage on Valley Boulevard, and one (1) fire hydrant is located on S. 6th Avenue.

Proposed Structures
The Applicant proposes to construct a new 140,720 sq ft tilt-up concrete industrial building to accommodate one (1) tenant for manufacturing, warehousing/distribution uses (refer to Figure 2-8 Conceptual Site Plan). The front of the building will be oriented towards E. Valley Blvd. and a proposed truck yard, including dock-high doors and truck parking spaces, will be oriented towards the southeastern portion of the site. Access to the truck yard will be provided via an eight-foot-tall (8’) high tube steel sliding gate as well as two (2) eight-foot-tall (8’) tilt-up concrete screen walls. The proposed building consists of warehouse space, office space split between two stories located at the front of the

Page 529 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 9 ends

building, and a mezzanine. The proposed building will be forty-eight feet (48’) tall. In addition, the Project will install three fire hydrants on-site in locations determined by the Fire Department
Construction
The proposed Project includes the demolition of the existing on-site buildings, parking lots, landscaping, and sidewalk. The proposed Project will be constructed in one (1) phase and is anticipated to commence in Quarter one (Q1) of 2027 and will last for approximately ten (10) months. Construction activities include demolition, site preparation, grading, building construction, paving and architectural coatings.

Utilities
An existing sewer mainline is located in E. Valley Blvd. and a gravity sewer line is located in 6th Avenue. The proposed Project would connect to these existing lines for sewer services. The Project site is located in the San Gabriel Water Company boundaries and would connect to existing water mainline in E. Valley Blvd. No impacts are proposed to the existing fire hydrants allocated along 6th Ave. and E. Valley Boulevard.

Circulation
Proposed access to the site will be provided via one (1) forty-foot (40’) wide driveway off E. Valley Blvd. and one (1) twenty-eight-foot (28’) wide driveway off S. 6th Ave. A twenty-eight-foot-wide (28’) drive aisle is proposed around the building that will provide circulation within the site and serve as a fire access road. The Project provides a total of 191 parking stalls, including 138 standard parking stalls and 53 standard electric vehicle (EV) parking stalls, consistent with Section 17.36.060.K. of the City’s Municipal Code (“Code”). Additionally, the Project includes 14 dock-high doors for truck docking on the south-eastern side of the building. Six (6) bike racks are proposed at the front of the building.

Landscaping/Fencing/ Lighting
The Project includes 45,570 square feet of total landscaped area (16.17% of property).

Landscaping is proposed along the Project frontage on E. Valley Blvd., S. 6th Ave., throughout the parking lot, and along the perimeter of the building and Project site.

Landscaping materials include drought tolerant shrubs, ground cover and trees. An eight-foot-tall high tube steel fence is proposed along the permitter of the eastern and southern portion of the site. The Project will include security lighting around the perimeter of the site and building, as well as throughout the parking lot.

Discretionary Actions and Maximum Development Scenario
The Project includes the following discretionary actions:
• Adoption of a Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program
• Approval of a General Plan Amendment (General Plan Amendment No. 24-03) • Approval of Zone Change (Zone Change Amendment No. 24-09) • Approval of Development Plan Application- Long Form (Development Plan No. 24-01)
• Approval of Annexation

Page 530 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 10 ends

These entitlements would facilitate the redevelopment of approximately 6.47 acres with a new 140,720-square-foot industrial building that includes warehouse, office, and mezzanine components.

Under the proposed zoning, the maximum allowable Floor Area Ratio (FAR) is 0.5:1, which equates to approximately 136,125 square feet of allowable building area on the 281,705.75 square-foot site. The proposed Project which includes a 140,720 square foot industrial building, remains consistent with the overall intensity, scale, and character anticipated under the City’s Industrial (M) zoning standards. The Project also complies with applicable height, landscaping, and parking requirements.

The Industrial (M) zoning designation permits a variety of industrial, and employment-generating uses, including warehousing, distribution, manufacturing, research and development, and e-commerce fulfillment centers. These uses differ in terms of operational characteristics, trip generation, and potential environmental impacts. The Applicant proposes to construct a new 140,720-square-foot tilt-up concrete industrial building to accommodate one tenant for manufacturing and warehousing/distribution uses. While the proposed Project represents near-maximum physical buildout of the site, it does not represent the most intensive use allowed under the M zoning. More intensive uses—such as high-cube distribution centers or e-commerce fulfillment centers—are permitted and could result in greater transportation, energy, and air quality impacts than the proposed manufacturing and warehousing operations.

For the purposes of environmental analysis under CEQA, this Initial Study/Mitigated Negative Declaration (IS/MND) evaluates the proposed Project—the 140,720-square-foot industrial building described herein—as the reasonably foreseeable development under the annexation, GPA, and ZC. Any development beyond the scope of this Project would require separate environmental review.

9. Surrounding Land Uses and Setting:

The Project site is located in an urban, built-up environment. Immediate surrounding uses include warehouses for manufacturing and distribution, a drive-thru restaurant, and the Southern Pacific Railroad. Surrounding parcels are designated Employment under the City’s General Plan and Light Industrial (IL) under the County of Los Angeles. The surrounding land uses are further described below:

North: North of the site is the intersection of Valley Blvd. and S. 6th Ave. A drive-through restaurant and industrial buildings are located north of this intersection followed by the Southern Pacific Railroad.

East: Uses east of the site consist of industrial buildings used for manufacturing and distribution and are located within the City and Los Angeles County.

South: Uses immediately south of the site consist of industrial warehouses located within the City. A single-family residence is located 763 feet southwest of the site at 14362 Proctor Avenue.

Page 531 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 11 ends

West: West of the site is located in unincorporated Los Angels County and consists of commercial and light industrial uses.

10. Other Public Agencies Whose Approval is Required (e.g., permits, financing approval, or participation agreement):
• Los Angeles Regional Water Quality Control Board (NPDES permit; construction storm water run-off permits, Storm Drain MS4 Permit)
• Los Angeles County Fire Department (for emergency site access review) • Los Angeles County Building Department (site plan review) • Los Angeles County Public Works Department

11. California Native American Tribes:

Have California Native American tribes traditionally and culturally affiliated with the project area requested consultation pursuant to Public Resources Code section 21080.3.1? If so, is there a plan for consultation that includes, for example, the determination of significance of impacts to tribal cultural resources, procedures regarding confidentiality, etc.?
Note: Conducting consultation early in the CEQA process allows tribal governments, lead agencies, and project proponents to discuss the level of environmental review, identify and address potential adverse impacts to tribal cultural resources, and reduce the potential for delay and conflict in the environmental review process. (See Public Resources Code section 21083.3.2.) Information may also be available from the California Native American Heritage Commission’s Sacred Lands File per Public Resources Code section 5097.96 and the California Historical Resources Information System administered by the California Office of Historic Preservation.

Please also note that Public Resources Code section 21082.3(c) contains provisions specific to confidentiality.

The City, as Lead Agency, commenced the AB 52 process by transmitting letters of notification on March 13, 2025, to the following tribes traditionally and/or culturally affiliated with the Project area or have specifically requested notice for all projects within the City: Soboba Band of Luiseño Indians, Gabrielino Tongva Tribe and the Gabrieleño Band of Mission Indians – Kizh Nation. The City received one (1) request for consultation from the Gabrieleño Band of Mission Indians – Kizh Nation. Consultation was conducted on March 14, 2025, and the Gabrieleño Band of Mission Indians – Kizh Nation provided mitigation measures which are incorporated into Section XVIII. Tribal Cultural Resources of this IS/MND. The City therefore has complied with the requirements of AB 52.

Page 532 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 12 ends

F igure 2-1: Regional Map

Page 533 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 13 ends

Figure 2-2: Project Boundary

Page 534 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 14 ends

Figure 2-3: Assessor’s Parcel Number

Page 535 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 15 ends

Figure 2-4: City of Industry General Plan Land Use

Page 536 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 16 ends

Figure 2-5: City of Industry Zoni

Page 537 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 17 ends

Figure 2-6: Existing Zoning

Page 538 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 18 ends

Figure 2-7: Proposed Zoning Designation City of Industry

Page 539 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 19 ends

Figure 2-8: Conceptual Site Plan

Page 540 of 9818 ends
Page 541 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 21 ends

2.4 Evaluation of Environmental Impacts
1) A brief explanation is required for all answers except “No Impact” answers that are adequately supported by the information sources a lead agency cites in the parentheses following each question. A “No Impact” answer is adequately supported if the referenced information sources show that the impact simply does not apply to projects like the one involved (e.g., the Project falls outside a fault rupture zone). A “No Impact” answer should be explained where it is based on project-specific factors, as well as general standards (e.g., the Project would not expose sensitive receptors to pollutants, based on a project-specific screening analysis). 2) All answers must take account of the whole action involved, including off-site as well as on-site, cumulative as well as project-level, indirect as well as direct, and construction as well as operational impacts.
3) Once the lead agency has determined that a particular physical impact may occur, then the checklist answers must indicate whether the impact is potentially significant, less than significant with mitigation, or less than significant. “Potentially Significant Impact” is appropriate if there is substantial evidence that an effect may be significant.

If there are one or more “Potentially Significant Impact” entries when the determination is made, an EIR is required.
4) “Negative Declaration: Less Than Significant with Mitigation Incorporated” applies where the incorporation of mitigation measures has reduced an effect from “Potentially Significant Impact” to a “Less Than Significant Impact.” The lead agency must describe the mitigation measures and briefly explain how they reduce the effect to a less than significant level (mitigation measures from “Earlier Analyses,” as described in (5) below, may be cross referenced).
5) Earlier analyses may be used where, pursuant to the tiering, program EIR, or other CEQA process, an effect has been adequately analyzed in an earlier EIR or negative declaration. Section 15063(c)(3)(D). In this case, a brief discussion should identify the following:
a) Earlier Analysis Used. Identify and state where they are available for review. b) Impacts Adequately Addressed. Identify which effects from the above checklist were within the scope of and adequately analyzed in an earlier document pursuant to applicable legal standards, and state whether such effects were addressed by mitigation measures based on the earlier analysis.
c) Mitigation Measures. For effects that are “Less than Significant with Mitigation Measures Incorporated,” describe the mitigation measures which were incorporated or refined from the earlier document and the extent to which they address site-specific conditions for the Project.
6) Lead agencies are encouraged to incorporate into the checklist references to information sources for potential impacts (e.g., general plans, zoning ordinances).

Reference to a previously prepared or outside document should, where appropriate,

Page 542 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 22 ends