include a reference to the page or pages where the statement is substantiated. 7) Supporting Information Sources: A source list should be attached, and other sources used, or individuals contacted should be cited in the discussion. 8) This is only a suggested form, and lead agencies are free to use different formats; however, lead agencies should normally address the questions from this checklist that are relevant to a project’s environmental effects in whatever format is selected. 9) The explanation of each issue should identify:
a) the significance criteria or threshold, if any, used to evaluate each question; and b) the mitigation measure identified, if any, to reduce the impact to less than significant.

Page 543 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 23 ends

CHAPTER THREE – ENVIRONMENTAL IMPACT DISCUSSION
Potentially
Significant
Impact
Less Than
Significant
with Mitigation
Incorporated
Less Than
Significant
Impact
No Impact
I. Aesthetics – Except as provided in Public Resources Code Section 21099, would the project:
a) Have a substantial adverse effect on a
scenic vista?
b) Substantially damage scenic resources,
including, but not limited to, trees, rock
outcroppings, and historic buildings within a
state scenic highway?
c) In nonurbanized areas, substantially
degrade the existing visual character or
quality of public views of the site and its
surroundings? (Public views are those that
are experienced from publicly accessible
vantage point). If the project is in an
urbanized area, would the project conflict
with applicable zoning and other regulations
governing scenic quality?
d) Create a new source of substantial light or
glare which would adversely affect day or
nighttime views in the area?
Project Impacts and Mitigation Measures
Sources:
• City of Industry 2014 General Plan (adopted June 12, 2014) • City of Industry 2014 General Plan Final EIR (certified June 12, 2014) • Industry Municipal Code, Section 17.56.010 Height of Structures • Los Angeles County GIS-NET
• Submitted Project Materials
• California Department of Transportation. List of Eligible and Officially Designated State Scenic Highways, 2019
Findings of Fact: The Project site is located in an urban, built-up environment within the northwestern portion of the City, and in unincorporated County of Los Angeles. The Project site is currently developed and consists of six (6) buildings totaling 199,840 square feet that are used for storage, commercial, warehousing and parts assembly purposes. Uses surrounding the Project site include manufacturing, distribution and commercial buildings. The Project site is bounded by Valley Boulevard to the northeast, S. 6th Ave. to the northwest, and existing manufacturing/distribution uses to the south. The nearest State-designated scenic highway is a portion of State Route 91 (SR-91) located approximately 15.7 miles southeast of the Project site.

Page 544 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 24 ends

The nearest historic building is the Workman and Temple Family Homestead Museum which is located approximately 1.3 miles southeast of the Project site within the City’s jurisdiction.

The Applicant proposes to demolish the existing buildings onsite and construct one (1) industrial building totaling 140,720 square feet with a maximum building height of 50 feet. Pursuant to Section 17.56.010 of the City’s Code, the maximum building height for the Industrial (M) zone is 150 feet. The proposed building will include new sources of lighting that will be consistent in scale and character with the surrounding industrial uses and developments. Lighting will be constructed in a manner that prohibits excessive glare and light spill by utilizing shields or hoods that direct the light in a downward manner away from adjoining properties. These additional light sources are not anticipated to be substantial enough to adversely affect day or nighttime views in the area.

The Project will be conditioned during the entitlement process to ensure compliance with the City’s standards related to lighting.

The proposed Project includes an annexation, a General Plan Amendment, and a Zone Change to allow industrial development consistent with the City of Industry’s Industrial (M) zoning designation. The Project site consists of two parcels: Assessor’s Parcel Number (APN) 8206-027- 058, currently within the City of Industry, and APN 8206-027-080, currently in unincorporated County of Los Angeles, and proposed for annexation. This IS/MND evaluates the environmental impacts of the specific proposed Project—a new 140,720-square-foot industrial building— representing the reasonably foreseeable development enabled by these entitlements. While the Industrial (M) zone permits a range of uses with potentially greater environmental impacts (e.g., high-cube warehouses or e-commerce centers), this analysis conservatively evaluates the Project as proposed and does not speculate on future or alternative uses. Therefore, the findings of this section reflect the maximum anticipated environmental effects associated with the proposed Project.

Discussion of Impacts
a) Have a substantial adverse effect on a scenic vista? No Impact: Scenic vistas consist of expansive, panoramic views of important, unique, or highly valued visual features that are seen from public viewing areas. Scenic vistas within the City are provided by the Puente Hills to the south and the San Gabriel Mountains to the north.

The Project site is not located in a scenic vista and is surrounded by manufacturing, distribution, and commercial uses. Therefore, the Project would not have substantial adverse effects on a scenic vista and no impact would occur.
b) Substantially damage scenic resources, including, but not limited to, trees, rock outcroppings, and historic buildings within a state scenic highway?
No Impact: The Project site is fully developed with existing buildings, pavement, parking areas, and ornamental landscaping, and does not contain any scenic resources such as native trees, rock outcroppings, or historic buildings. The nearest State-designated scenic highway is a segment of SR-91, located approximately 15.7 miles southeast of the Project site, and the closest historic resource, the Workman and Temple Family Homestead Museum, is located 1.3 miles away. Given the urbanized condition of the site, its existing development, and the considerable distance from any designated scenic highways or historic structures, the Project would not damage any scenic resources. Therefore, no impact would occur.

Page 545 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 25 ends

c) In nonurbanized areas, substantially degrade the existing visual character or quality of public views of the site and its surroundings? (Public views are those that are experienced from publicly accessible vantage point). If the project is in an urbanized area, would the project conflict with applicable zoning and other regulations governing scenic quality? Less than Significant Impact: The Project site is located within an urbanized area and is proposed to be zoned in the Industrial (M) zone. The proposed land use, an industrial warehouse, is consistent with the permitted uses under the M zoning district. The proposed building height of 48 feet is well below the maximum allowed 150 feet, and the Project will be designed in accordance with applicable setback, lot coverage, and floor area ratio requirements. The Project will also undergo the City’s site plan and design review process, ensuring consistency with architectural design standards, including requirements for building articulation, screening, and landscaping that support visual quality.

The Project site is not located within a designated scenic corridor and does not contain visually sensitive features such as hillsides, open space preserves, or water bodies. Public views of the site are limited to adjacent roadways, and the Project includes streetscape enhancements, such as landscaping and sidewalk improvements, to help integrate the development into the existing urban fabric and minimize visual disruption.

As a result, the Project would not conflict with applicable zoning or other regulations governing scenic quality, and impacts related to visual character or public views would be less than significant.
d) Create a new source of substantial light or glare which would adversely affect day or nighttime views in the area?
Less than Significant Impact: The Project site is located within a developed urban setting characterized by existing sources of light from on-site structures, parking areas, and nearby industrial uses. The Project is not located near residential uses or other light-sensitive receptors. Redevelopment of the site would introduce additional lighting sources, including building-mounted lights, walkway and driveway illumination, and parking lot lighting. However, all proposed lighting would be designed to comply with the City’s General Plan, Zoning Code, and California Building Code (CBC) requirements. Lighting would be reviewed by the City to ensure it is directed, shielded, and arranged to minimize glare and prevent spillover onto adjacent properties. As a result, the new light sources are not anticipated to significantly affect day or nighttime views. Therefore, the impact would be less than significant.

Page 546 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 26 ends

Project Impacts and Mitigation Measures
Sources:
• City of Industry 2014 General Plan (adopted June 12, 2014) • Los Angeles County General Plan Update 2035
• California Department of Conservation (CDC). California Important Farmland Finder, 2016 Potentially
Significant
Impact
Less Than
Significant
with Mitigation
Incorporated
Less Than
Significant
Impact
No Impact
II. Agricultural and Forestry Resources – In determining whether impacts to agricultural resources are significant environmental effects, lead agencies may refer to the California Agricultural Land Evaluation and Site Assessment Model (1997) prepared by the California Department of Conservation as an optional model to use in assessing impacts on agriculture and farmland. In determining whether impacts to forest resources, including timberland, are significant environmental effects, lead agencies may refer to the information compiled by the California Department of Forestry and Fire Protection regarding the State’s inventory of forest land, including the Forest Legacy Assessment Project; and forest carbon measurement methodology provided in Forest Protocols adopted by the California Air Resources Board. Would the project:
a) Convert Prime Farmland, Unique
Farmland, or Farmland of Statewide
Importance (Farmland), as shown on the
maps prepared pursuant to the Farmland
Mapping and Monitoring Program of the
California Resources Agency, to
nonagricultural use?
b) Conflict with existing zoning for agricultural
use, or a Williamson Act contract?
c) Conflict with existing zoning for, or cause
rezoning of, forest land (as defined by
Public Resource Code section 12220(g)),
timberland (as defined by Public Resource
Code section 4526), or timberland zoned
Timberland Production (as defined by
Government Code section 51104 (g))?
d) Result in the loss of forest land or
conversion of forest land to non-forest
use?
e) Involve other changes in the existing
environment which, due to their location or
nature, could result in conversion of
Farmland, to non-agricultural use or
conversion of forest land to non-forest
use?

Page 547 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 27 ends

Findings of Fact: The City was founded as a hub for business and industrial uses. According to the City’s General Plan Land Use Map, there are no land uses designated for agriculture, forest, or timberland within the City boundaries. Furthermore, the Project site is located within unincorporated Los Angels County, and the westerly portion of the City near the City of La Puente and the communities of Avocado Heights, Hillgrove and West Puente Valley within unincorporated County of Los Angeles, which contain highly urbanized residential and commercial communities.

The Project site has a land use designation of Employment and a zoning designation of Industrial (M) for APN: 8206-027-058. APN 8206-027-080 is designated Light Industrial (IL) and zoned Restricted Heavy Manufacturing (M-1.5) under the Los Angeles County General Plan and zoning code, and is currently developed with six (6) existing buildings. Finally, there is no active agriculture, forest, or timberland within the vicinity of the Project.

Discussion of Impacts
a) Convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland), as shown on the maps prepared pursuant to the Farmland Mapping and Monitoring Program of the California Resources Agency, to nonagricultural use? b) Conflict with existing zoning for agricultural use, or a Williamson Act contract? c) Conflict with existing zoning for, or cause rezoning of, forest land (as defined by Public Resource Code section 12220(g)), timberland (as defined by Public Resource Code section 4526), or timberland zoned Timberland Production (as defined by Government Code section 51104 (g))?
d) Result in the loss of forest land or conversion of forest land to non-forest use? e) Involve other changes in the existing environment which, due to their location or nature, could result in conversion of Farmland, to non-agricultural use or conversion of forest land to non-forest use? a-e) No Impact: The following analysis addresses environmental checklist questions a) through e) for Agriculture and Forestry Resources. The California Department of Conservation manages the Farmland Mapping and Monitoring Program (FMMP), which identifies and maps significant farmland. Farmland is classified using a system of five categories including Prime Farmland, Farmland of Statewide Importance, Unique Farmland, Farmland of Local Importance or Potential, and Grazing Land. The classification of farmland is determined by a soil survey conducted by the Natural Resources Conservation Service (NRCS) which analyzes the suitability of soils for agricultural production. Based on the Important Farmland Finder, an interactive GIS application, the Project site is identified as “Urban and Built-Up Land” and there are no agricultural resources located within the City or the vicinity of the site.

The Project site is not subject to a Williamson Act contract, nor would the Project conflict with zoning for agriculture uses, forest land area, or timberland production. The proposed Project includes an annexation of one parcel, General Plan Amendment (GPA), and Zone Change (ZC) in the City of Industry. These actions would not result in the conversion of designated or protected agricultural or forest lands to non-agricultural or non-forest uses, as the site is already urbanized and lacks such designations under existing County or City land use plans.

Additionally, the GPA and ZC would align the site’s land use and zoning designations with

Page 548 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 28 ends

its existing developed condition and planned urban use, rather than facilitating new conversion of agricultural land.

Therefore, implementation of the Project, including the annexation of one parcel, GPA, and ZC would not result in the conversion of farmland to non-agricultural use or forest land to non-forest use, and no impact to agricultural or forestry resources would occur.

Page 549 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 29 ends

Potentially
Significant
Impact
Less Than
Significant
with Mitigation
Incorporated
Less Than
Significant
Impact
No Impact
III. Air Quality – Where available, the significance criteria established by the applicable air quality management district or air pollution control district may be relied upon to make the following determinations.

Would the project:
a) Conflict with or obstruct implementation of
the applicable air quality plan?
b) Result in a cumulatively considerable net
increase of any criteria pollutant for which
the project region is non-attainment under
an applicable federal or state ambient air
quality standard?
c) Expose sensitive receptors to substantial
pollutant concentrations?
d) Result in other emissions (such as those
leading to odors) adversely affecting a
substantial number of people?
Project Impacts and Mitigation Measures
Sources:
• City of Industry 2014 General Plan (adopted June 12, 2014) • Los Angeles County GIS-NET
• South Coast Air Quality Management District (SCAQMD) Air Quality Management Plan (AQMP). adopted December 2, 2022.
• 6th Street Air Quality and Greenhouse Gas Assessment. Urban Crossroads, Inc.

December 24, 2025. (Appendix A)
Findings of Fact: The Project is located within the South Coast Air Basin (SCAB), an area that is under the jurisdiction of the South Coast Air Quality Management District (SCAQMD). The SCAQMD is responsible for implementing air quality management plans (AQMPs) to comply with both federal and state air quality standards. These standards address various "criteria" pollutants, including ozone (O3), nitrogen oxides (NOX), particulate matter (PM), carbon monoxide (CO), sulfur dioxide (SO2), and lead (Pb). Within the SCAB, the region is in nonattainment for several of these pollutants, particularly ozone, PM10, and PM2.5.

Criteria Pollutants and Thresholds
Both the U.S. Environmental Protection Agency (EPA) and the California Air Resources Board (CARB) have established ambient air quality standards for common pollutants. These ambient air quality standards are levels of contaminants representing safe levels that avoid specific

Page 550 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 30 ends

adverse health effects associated with each pollutant. The ambient air quality standards cover what are called “criteria” pollutants because the health and other effects of each pollutant are described in criteria documents. The six criteria pollutants are ozone (O3) (precursor emissions include NOX and reactive organic gases (ROG)), CO, particulate matter (PM), nitrogen dioxide (NO2), sulfur dioxide (SO2), and lead (Pb). Areas that meet ambient air quality standards are classified as attainment areas, while areas that do not meet these standards are classified as nonattainment areas.

Regional Air Quality
The SCAQMD has developed regional significance thresholds for criteria pollutants, as summarized in Table 3-1. The SCAQMD’s CEQA Air Quality Significance Thresholds (March 2023) indicate that any projects in the SCAB with daily emissions that exceed any of the indicated thresholds should be considered as having an individually and cumulatively significant air quality impact.

Table 3-1 Maximum Daily Regional Emissions Thresholds
Pollutant Construction (lbs./day) Operation (lbs./day)
NOx 100 55
VOC 75 55
PM10 150 150
PM2.5 55 55
SOx 150 150
CO 550 550
Pb 3 3
*lbs./day – Pounds Per Day
Local Air Quality
This analysis follows the SCAQMD Final Localized Significance Threshold (LST) Methodology.

LSTs identify the maximum emissions a project can produce without causing or contributing to exceedances of federal or state ambient air quality standards (NAAQS/CAAQS) at the nearest residence or sensitive receptor. Developed under the SCAQMD Governing Board’s Environmental Justice Initiative I-4, LSTs address public concerns about localized exposure to air pollutants. Lead agencies may use LSTs as an additional indicator of air quality impact significance. LSTs apply to CO, NO2, PM10, and PM2.5, with thresholds for localized construction and operational emissions presented below in Table 3-2 (Appendix A).

Page 551 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 31 ends

Table 3-2 Localized Emissions Significance Thresholds
Pollutant Construction (ppm) Operation (ppm)
NOx 0.18 0.18
CO (1-hour average) 20 20
CO (8-hour average) 9 9
PM10 10.4 μg/m3 2.5 μg/m3
PM2.5 10.4 μg/m3 2.5 μg/m3
Toxic Air Contaminants (TAC)
In 1984, as a result of public concern for exposure to airborne carcinogens, CARB adopted regulations to reduce the amount of TAC emissions resulting from mobile and area sources, such as cars, trucks, stationary products, and consumer products. The seven TACs studied include those that are derived from mobile sources: diesel particulate matter (DPM), benzene (C6H6), and 1,3-butadiene (C4H6); those that are derived from stationary sources:
perchloroethylene (C2Cl4) and hexavalent chromium (Cr(VI)); and those derived from photochemical reactions of emitted VOCs: formaldehyde (CH2O) and acetaldehyde (C2H4O).

Sensitive Receptors
Some people are especially sensitive to air pollution and are given special consideration when evaluating air quality impacts from projects. These groups of people include children, the elderly, and individuals with pre-existing respiratory or cardiovascular illnesses. Structures that house these persons or places where they gather are defined as “sensitive receptors”. These structures typically include residences, hotels, and hospitals where an individual can remain for 24 hours.

Consistent with the LST Methodology, the nearest land use to the Project site where an individual could remain for 24 hours has been used to determine construction and operational air quality impacts for emissions of PM10 and PM2.5, since PM10 and PM2.5 thresholds are based on a 24-hour averaging time. The nearest sensitive receptor to the Project site is a residence located at 14362 Proctor Ave, approximately 783 feet southwest of the Project site.

The Project would not result in a cumulatively considerable increase in any criteria pollutants or expose sensitive receptors to substantial pollutant concentrations. Operational emissions would be less than significant, and construction emissions would also remain below applicable thresholds.

The proposed Project includes an annexation of one parcel, a General Plan Amendment, and a Zone Change that would allow for industrial development consistent with the City of Industry’s Industrial (M) zoning designation. The Project site consists of two parcels: Assessor’s Parcel Number (APN) 8206-027-058, which is currently located within the City of Industry, and APN 8206-027-080, which is located in unincorporated County of Los Angeles, and would be annexed into the City as part of the proposed Project. The Air Quality analysis herein evaluates emissions associated with the proposed Project, which represents the full buildout of the site as authorized by the annexation, General Plan Amendment, and Zone Change to the Industrial (M) zoning designation.

An Air Quality and Greenhouse Gas Assessment was prepared by Urban Crossroads, dated December 24, 2025 (Appendix A). This report used the California Emissions Estimator Model

Page 552 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 32 ends

(CalEEMod) to estimate emissions from construction and operational activities related to the Project. The findings of this assessment indicate that construction and operational air pollutant emissions will not exceed the SCAQMD's regional or localized significance thresholds and therefore will not result in a significant impact to air quality.

Discussion of Impacts
a) Conflict with or obstruct implementation of the applicable air quality plan? Less than Significant Impact: The Project site is located within the SCAB, which is characterized by relatively poor air quality. The SCAQMD is principally responsible for air pollution control and works directly with the Southern California Association of Governments (SCAG), county transportation commissions, local governments, as well as state and federal agencies to reduce emissions from stationary, mobile, and indirect sources to meet state and federal ambient air quality standards. Currently, these state and federal air quality standards are exceeded in most parts of the SCAB. In response, the SCAQMD has adopted a series of AQMPs to meet the state and federal ambient air quality standards. AQMPs are updated regularly in order to more effectively reduce emissions, accommodate growth, and to minimize any negative fiscal impacts of air pollution control on the economy.

In December 2022, the SCAQMD released the Final 2022 Air Quality Management Plan (AQMP) that establishes thresholds for criteria pollutants; projects that exceed any of the indicated daily thresholds should be considered as having an individually and cumulatively significant air quality impact and are not in compliance with the AQMP. The primary purpose of the air quality plan is to bring an area that does not attain federal and state air quality standards into compliance with those standards pursuant to the requirements of the Clean Air Act and California Clean Air Act. A proposed project should be considered to be consistent with the AQMP if it furthers one or more policies and does not obstruct other policies. The SCAQMD CEQA Handbook identifies two key indicators of consistency:
1) Whether the project will result in an increase in the frequency or severity of existing air quality violations or cause or contribute to new violations or delay timely attainment of air quality standards or the interim emission reductions specified in the AQMP. 2) Whether the project will exceed the assumptions in the AQMP, or increments based on the years of project buildout phase.

Criterion 1 - Increase in the Frequency or Severity of Violations? The violations that Consistency Criterion No. 1 refers to are the California Ambient Air Quality Standards (CAAQS) and National Ambient Air Quality Standards (NAAQS). CAAQS and NAAQS violations would occur if regional or localized significance thresholds were exceeded.

As evaluated in the Air Quality and Greenhouse Gas Assessment (Appendix A), the Project’s regional and localized construction and operational-source emissions would not exceed applicable regional significance thresholds. As such, a less than significant impact is expected.

Page 553 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 33 ends

Criterion 2 - Exceed Assumptions in the AQMP?
The 2022 AQMP demonstrates that the applicable ambient air quality standards can be achieved within the timeframes required under federal law. Growth projections from local general plans adopted by cities in the district are provided to the SCAG, which develops regional growth forecasts, which are then used to develop future air quality forecasts for the AQMP. Development consistent with the growth projections in the City’s General Plan is considered to be consistent with the AQMP.

The Project includes an annexation of one parcel (APN 8206-027-080) from unincorporated County of Los Angeles into the City of Industry, along with a General Plan Amendment and Zone Change to apply the City’s Employment land use designation and Industrial (M) zoning designation. The existing County zoning for this parcel is Restricted Heavy Manufacturing (M-1.5), which allows certain heavy industrial uses differing in intensity and environmental impacts from those permitted under the City’s Industrial (M) zoning. While the Project requires changes to the existing County land use and zoning, SCAG’s regional growth forecasts and the AQMP’s assumptions reflect development consistent with the City of Industry’s General Plan and zoning designations, including this parcel post-annexation.

Thus, although the Project changes the land use and zoning designations, the proposed development is consistent with the growth forecast for the City, which anticipates buildout under the City’s land use and zoning framework.

The Air Quality and Greenhouse Gas Assessment (Appendix A) evaluates emissions based on the proposed Project consistent with the City’s zoning and land use designations. The Project would not exceed regional or localized air quality significance thresholds. Based on the preceding discussion, the Project is determined to be consistent with the AQMP, and a less than significant impact is expected.
b) Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non-attainment under an applicable federal or state ambient air quality standard?
Less than Significant Impact: The CAAQS designate the Project site as nonattainment for O3, PM10, and PM2.5, while the NAAQS designates the Project site as nonattainment for O3 and PM2.5. The SCAQMD states that individual projects that do not generate operational or construction emissions that exceed the SCAQMD’s recommended daily thresholds for project‐specific impacts would also not cause a cumulatively considerable increase in emissions for those pollutants for which the Basin is in nonattainment, and, therefore, would not be considered to have a significant, adverse air quality impact. Alternatively, individual project‐related construction and operational emissions that exceed SCAQMD thresholds for project‐specific impacts would be considered cumulatively considerable. The following analysis is based on the Air Quality and Greenhouse Gas Assessment prepared by Urban Crossroads (Appendix A).

Construction Related Impacts
The Project involves construction activities associated with demolition, site preparation, grading, building construction, paving and architectural coating. Construction activities associated with the Project would result in emissions of VOCs, NOX, SOX, CO, PM10, and

Page 554 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 34 ends

PM2.5. Construction is scheduled to occur in quarter one of 2026 and will last approximately ten (10) months. The construction schedule utilized in Urban Crossroad’s analysis represents a “worst-case” analysis scenario should construction occur any time after the respective dates since emission factors for construction decrease as time passes and the analysis year increases due to emission regulations becoming more stringent. Table 3-3 presents the results of the Project's regional construction impact assessment.

Table 3-3 Regional Construction Emissions Summary
Year Emissions (pounds/day)
ROG NOX CO SO2 PM10 T PM2.5 T
Summer
2026 3.90 34.72 32.15 0.05 7.67 4.37
Winter
2026 3.90 47.27 31.99 0.19 11.21 4.37
2027 43.40 19.62 30.91 0.05 2.03 0.95
Maximum Daily Emissions 43.40 47.27 32.15 0.19 11.21 4.37 SCAQMD Regional Threshold 75 100 550 150 150 55
Threshold Exceeded? No No No No No No
Table 3-4 Localized Construction Significance Summary
Peak Construction
CO NO2 PM10 PM2.5
Averaging Time
1-hour 8-hours 1-hour 24-hours 24-hours
Peak day localized emissions 0.14 0.05 0.09 8.21 4.33
Background concentration 1.8 1.3 0.058
Total concentration 1.94 1.36 0.15 8.21 4.33
SCAQMD Localized Significance
Threshold
20 9 0.18 10.4 10.4
Threshold Exceeded? No No No No No
The Project-specific evaluation of emissions presented in Tables 3-3 and 3-4 demonstrates that proposed Project construction-source air pollutant emissions would not result in exceedances of regional or localized thresholds. Therefore, proposed Project construction-source emissions would be considered less than significant on a project-specific and cumulative basis.

Operation Related Impacts
Long-term air quality impacts generally involve mobile source emissions generated from project-related traffic and stationary source emissions. Operational emissions would be expected from the following primary sources—mobile source emissions, area source emissions, energy source emissions, and on-site equipment emissions. The estimated emissions generated by Project operations are shown in Tables 3-5 and 3-6, which presents the results of the Project's regional and localized operation impact assessment. The Project

Page 555 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 35 ends

would not exceed the thresholds of significance established by the SCAQMD for emissions of any criteria pollutant. Therefore, operational emissions would be less than significant.

Table 3-5 Total Project Regional Operational Emissions
Source Emissions (pounds/day)
ROG NOX CO SO2 PM10T PM2.5T
Summer
Mobile 0.65 7.39 8.17 0.08 3.53 1.00
Area 4.22 0.05 6.12 0.00 0.01 0.01
Stationary 1.64 4.59 4.18 0.01 0.24 0.24
Cargo Handling Equipment 0.12 0.38 16.44 0.00 0.03 0.03 Maximum Daily Emissions 6.62 12.41 34.91 0.09 3.81 1.28 SCAQMD Regional Threshold 55 55 550 150 150 55
Threshold Exceeded? No No No No No No
Source Emissions (pounds/day)
ROG NOX CO SO2 PM10T PM2.5T
Winter
Mobile 0.64 7.71 7.71 0.08 3.53 1.00
Area 3.21 0.00 0.00 0.00 0.00 0.00
Stationary 1.64 4.59 4.18 0.01 0.24 0.24
Cargo Handling Equipment 0.12 0.38 16.44 0.00 0.03 0.03 Maximum Daily Emissions 5.61 12.68 28.34 0.08 3.80 1.27 SCAQMD Regional Threshold 55 55 550 150 150 55
Threshold Exceeded? No No No No No No
Table 3-6 Operational Localized Significance Summary
Peak Construction
CO NO2 PM10 PM2.5
Averaging Time
1-hour 8-hours 1-hour 24-hours 24-hours
Peak day localized emissions 5.87E-02 2.62E-02 7.51E-03 0.28 0.23 Background concentration 1.8 1.3 0.058
Total concentration 1.86 1.33 0.07 0.28 0.23
SCAQMD Localized
Significance Threshold
20 9 0.18 10.4 10.4
Threshold Exceeded? No No No No No
The Project-specific evaluation of emissions presented in the preceding analysis demonstrates that proposed Project operational-source air pollutant emissions would not result in exceedances of regional or local thresholds. The Project would not result in a cumulatively considerable net increase of any criteria pollutant for which the Project region is non-attainment under an applicable federal or state ambient air quality standard. Therefore,

Page 556 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 36 ends

the proposed Project operational-source emissions would be considered less than significant on a project-specific and cumulative basis.
c) Expose sensitive receptors to substantial pollutant concentrations? Less than Significant Impact: The nearest sensitive receptor to the Project site is listed below. All distances are measured from the Project site boundary to the outdoor living areas (e.g., backyards) or at the building façade, whichever is closer to the Project site. • Residence at 14362 Proctor Ave, approximately 783 feet southwest of the Project site.

As explained in Section III (b) above, construction and operational emissions would not exceed the applicable SCAQMD Localized Significant Thresholds (LSTs) for any criteria pollutant. Sensitive receptors in the vicinity of the Project site would not be exposed to substantial pollutant concentrations in violation of SCAQMD LSTs during construction or operation of the proposed Project. As the proposed Project will not cause or contribute to an exceedance of the most stringent applicable federal or state ambient air quality standard identified by SCAQMD at the nearest residence or sensitive receptor, impacts would be less than significant.
d) Result in other emissions (such as those leading to odors) adversely affecting a substantial number of people?
Less than Significant Impact: The Project will not involve land uses that are typically associated with odor complaints such as, agricultural uses, wastewater treatment plants, food processing plants, chemical plants, composting operations, refineries, landfills, dairies, and fiberglass molding facilities. Potential odor sources associated with the proposed Project may result from construction equipment exhaust and the application of asphalt and architectural coatings during construction activities and the temporary storage of typical solid waste (refuse) associated with the Project’s (long-term operational) uses. Standard construction requirements would minimize odor impacts from construction. The construction odor emissions would be temporary, short-term, and intermittent in nature and would cease upon completion of the respective phase of construction and is thus considered less than significant.

It is expected that Project-generated refuse would be stored in covered containers and removed at regular intervals in compliance with the City’s solid waste regulations. The Project would also be required to comply with SCAQMD Rule 402 (Nuisance) to prevent occurrences of public nuisances. Therefore, odors associated with the Project construction and operations would be less than significant and no mitigation is required.

Page 557 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 37 ends

Potentially
Significant
Impact
Less Than
Significant
with Mitigation
Incorporated
Less Than
Significant
Impact
No Impact
IV. Biological Resources: Would the project:
a) Have a substantial adverse effect, either
directly or through habitat modifications, on
any species identified as a candidate,
sensitive, or special status species in local
or regional plans, policies, or regulations,
or by the California Department of Fish and
Game or U.S. Fish and Wildlife Service?
b) Have a substantial adverse effect on any
riparian habitat or other sensitive natural
community identified in local or regional
plans, policies, regulations or by the
California Department of Fish and Game or
US Fish and Wildlife Service?
c) Have a substantial adverse effect on state
or federally protected wetlands (including,
but not limited to, marsh, vernal pool,
coastal, etc.) through direct removal, filling,
hydrological interruption, or other means?
d) Interfere substantially with the movement
of any native resident or migratory fish or
wildlife species or with established native
resident or migratory wildlife corridors, or
impede the use of native wildlife nursery
sites?
e) Conflict with any local policies or
ordinances protecting biological resources,
such as a tree preservation policy or
ordinance?
f) Conflict with the provisions of an adopted
Habitat Conservation Plan, Natural
Community Conservation Plan, or other
approved local, regional, or state habitat
conservation plan?
Project Impacts and Mitigation Measures
Sources:
• City of Industry 2014 General Plan (adopted June 12, 2014) • Los Angeles County GIS-NET
• San Gabriel River Corridor Máster Plan, June 2006

Page 558 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 38 ends

• California Department of Fish and Wildlife (CDFW) BIOS • U.S. Fish and Wildlife Service (USFWS) National Wetlands Inventory (NWI) Wetlands Mapper
• Migratory Bird Treaty Act of 1918, (16 U.S. Government Code [USC] 703) • National Land Cover Database Class Legend and Description (NLCD) Findings of Fact: The Project site is fully developed with industrial uses and contains no natural habitat or sensitive biological resources. It is designated as “Developed, High Intensity” in the National Land Cover Database, and is surrounded by similarly urbanized land. Due to its built-out condition and lack of suitable habitat, endangered species are not expected to occur on-site or in the immediate vicinity. Additionally, no wetlands are present, and nearby concrete-channelized waterways (La Puente Creek Channel and Thompson Wash) are located over half a mile away and will not be affected by Project development.

The Project involves an annexation of one parcel (APN: 8206-027-080) located in Avocado Heights in unincorporated County of Los Angeles, into the City of Industry, a General Plan Amendment to redesignate the site to Employment, and a ZC to apply the Industrial (M) zoning designation, which together would facilitate redevelopment of the property with a 140,720-square-foot industrial building containing warehouse, office, and mezzanine space. The annexation, GPA, and ZC themselves are administrative and do not involve physical disturbance; however, because they enable the foreseeable industrial redevelopment, the biological resources analysis considers the effects of the planned building. The site is currently developed and disturbed, supports only ornamental or ruderal vegetation, and contains no native habitats, sensitive natural communities, wildlife movement corridors, or jurisdictional waters. Due to the urbanized setting and lack of natural resources, the potential for special-status species to occur is low and limited mainly to nesting birds that may use existing ornamental trees or structures. With implementation of pre-construction nesting bird survey mitigation measure as stated below, biological resource impacts associated with the entitlements and the facilitated redevelopment would be less than significant.

Discussion of Impacts
a) Have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special status species in local or regional plans, policies, or regulations, or by the California Department of Fish and Game or U.S.

Fish and Wildlife Service?
No Impact: The Project site is fully developed with industrial uses and lacks suitable habitat for candidate, sensitive, or special status species. No such species are known to occur on-site or in the surrounding area. Therefore, Project implementation would not result in substantial adverse effects to these species and no impact would occur. b) Have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, regulations or by the California Department of Fish and Game or US Fish and Wildlife Service? No Impact: The Project site is fully developed and does not contain any riparian habitat, wetlands, jurisdictional waters, or sensitive natural communities. There are no surface water features, streams, or drainages within the Project boundary. Nearby waterways, such as La Puente Creek Channel and Thompson Wash, are approximately 0.6 miles south of the site

Page 559 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 39 ends

and are concrete-lined, intermittent, and highly modified. These features do not intersect the Project site and are not expected to be affected. The Project would continue to drain to existing stormwater infrastructure without altering site drainage patterns. Therefore, no adverse impacts to riparian or sensitive natural communities would occur, and no impact would occur.
c) Have a substantial adverse effect on state or federally protected wetlands (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means?
No Impact: No wetlands exist on-site. The nearest wetlands according to the NWI are La Puente Creek Channel and Thompson Wash located approximately 0.6 miles south of the Project site. Project implementation is not anticipated to cause a significant adverse effect to the channel or river. There will be no direct removal, filling, hydrological interruption, or other means of adverse effect as this wetland is located outside of the Project site.

Therefore, no impact would occur.
d) Interfere substantially with the movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors, or impede the use of native wildlife nursery sites?
Less than Significant with Mitigation Incorporated: The Project site is currently developed and includes ornamental trees and landscaping that could provide temporary nesting habitat for migratory birds protected under the Migratory Bird Treaty Act (MBTA).

These trees will be removed during Project demolition. Although the site is not part of a designated wildlife corridor or known nursery site, potential disturbance to nesting birds could occur. To avoid violations of the MBTA and reduce impacts, Mitigation Measure BIO-1 will be implemented, requiring nesting bird surveys and appropriate avoidance measures during the breeding season. With this mitigation, impacts to migratory species and potential habitat will be reduced to less than significant levels. e) Conflict with any local policies or ordinances protecting biological resources, such as a tree preservation policy or ordinance?
No Impact: The City has no ordinances protecting biological resources. There are no plans or policies at the local, regional, or state level dedicated to tree preservation that include the Project site. No impact would occur.
f) Conflict with the provisions of an adopted Habitat Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or state habitat conservation plan? No Impact: There are no adopted plans or policies at the local, regional, or state level dedicated to habitat conservation that govern the Project site (CDFW). No impact would occur.

Page 560 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 40 ends

Mitigation Measures
IV. (d)
BIO-1: Pre-Construction Nesting Bird Survey
If it is not feasible to avoid the nesting bird season (February 1st through August 31st), a qualified biologist shall conduct a pre-construction nesting bird survey for avian species to determine the presence/absence, location, and status of any active nests on or directly adjacent to the Project Site. If active nests are located, the extent of the survey buffer area surrounding the nest should be established by the qualified biologist to ensure that direct and indirect effects to nesting birds are avoided. To avoid the destruction of active nests and to protect the reproductive success of birds protected by the MBTA and the California Fish and Game Code (CFGC), the nesting bird survey shall occur no earlier than 10 days prior to the commencement of construction.

In the event that active nests are discovered, a suitable buffer (distance to be determined by the biologist) shall be established around such active nests, and no construction within the buffer allowed, until the biologist has determined that the nest(s) is no longer active (i.e., the nestlings have fledged and are no longer reliant on the nest).

Page 561 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 41 ends

Potentially
Significant
Impact
Less Than
Significant
with Mitigation
Incorporated
Less Than
Significant
Impact
No Impact
V. Cultural Resources – Would the project:
a) Cause a substantial adverse change in the
significance of a historical resource
pursuant to §15064.5?
b) Cause a substantial adverse change in the
significance of an archaeological resource
pursuant to §15064.5?
c) Disturb any human remains, including
those interred outside of formal
cemeteries?
Project Impacts and Mitigation Measures
Sources:
• City of Industry 2014 General Plan (adopted June 12, 2014) • California Environmental Quality Act (CEQA) 2023
• National Parks Service, U.S. Department of the Interior. National Register of Historic Places.

Findings of Fact: Cultural resources consist of places, sites, structures, artifacts, and landscapes that are considered important for scientific, traditional, religious, or other reasons. Resources may be historical, paleontological, archaeological, architectural, or archival in nature. The City is largely built-up and is devoted primarily to activities related to business and industry. The remaining vacant land is largely approved for development. The Workman and Temple Family Homestead Museum, located at 15415 Don Julian, is registered with the National Register of Historical Places, and is located approximately 1.3 miles southeast of the Project site within the City’s jurisdiction. Due to the built-up and industrialized uses of the site and surrounding areas, the discovery of cultural resources is unlikely. In the event that cultural resources are discovered during the grading phase of the Project, mitigation measures are identified below to ensure impacts would be less than significant.

The Project involves an annexation of one parcel (APN: 8206-027-080) located in Avocado Heights in unincorporated County of Los Angeles into the City of Industry, a General Plan Amendment to Employment, and a ZC to Industrial (M), which together would allow redevelopment with a 140,720-square-foot industrial building. Although the annexation and ZC are administrative, they enable ground-disturbing redevelopment, which is the basis for cultural resources review. The site is already developed and heavily disturbed, with no recorded historical, archaeological, or tribal cultural resources and no buildings or features with historical significance. Given the disturbed condition, the likelihood of encountering intact subsurface resources is low; however, standard inadvertent-discovery procedures are required to address

Page 562 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 42 ends

any unanticipated finds. With the incorporation of the mitigation measures stated below, cultural resources impacts would be less than significant.

Discussion of Impacts
a) Cause a substantial adverse change in the significance of a historical resource pursuant to §15064.5?
No Impact: Section 15064.5 of the CEQA Guidelines defines historic resources as resources listed or determined to be eligible for listing by the State Historical Resources Commission, a local register of historical resources, or the lead agency. Generally, a resource is considered “historically significant” if it meets one of the following criteria:
i) Is associated with events that have made a significant contribution to the broad patterns of California’s history and cultural heritage. ii) Is associated with the lives of persons important in our past. iii) Embodies the distinctive characteristics of a type, period, region or method of construction, or represents the work of an important creative individual, or possesses high artistic values.
iv) Has yielded, or may be likely to yield, information important in prehistory or history.

The Project site is a fully developed industrial site and thus does not meet the criteria for listing historical resources. Furthermore, the Project site is not within the immediate vicinity of a historical resource as defined in CEQA Guidelines §15064.5, and thus would not impact any historical resource and no impact would occur.
b) Cause a substantial adverse change in the significance of an archaeological resource pursuant to §15064.5?
Less than Significant Impact with Mitigation Incorporated: Archaeological resources are prehistoric or historic evidence of past human activities, including structural ruins and buried resources. Project construction would require grading activities and the demolition of the existing buildings and pavement onsite. Given the developed nature of the Project site and surrounding area, the discovery of archeological resources is unlikely. Although it is not anticipated that unknown cultural resources exist on-site, Mitigation Measure CUL-1 is identified to ensure that in the event unanticipated resources are encountered during grading activities, potential impacts would remain less than significant. In the event archeological resources are discovered, grading activities must cease, a qualified archeologist must be consulted, and all discoveries must be documented accordingly.

Implementation of the Project is not anticipated to result in a substantial adverse change in the significance of an archeological resource pursuant to Section 15064.5 of the CEQA Guidelines. A less than significant impact with mitigation incorporated would occur. c) Disturb any human remains, including those outside of formal cemeteries?

Page 563 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 43 ends

Less than Significant Impact with Mitigation Incorporated: Due to the developed nature of the Project site and surrounding area, no human remains or cemeteries are anticipated to be disturbed by the proposed Project. The likelihood of encountering human remains during Project development is unlikely. However, these findings do not preclude the existence of previously unknown human remains located below the ground surface, which may be encountered during construction excavations associated with the proposed Project.

As a result, Mitigation Measure CUL-1 has been identified to reduce potentially significant impacts to previously unknown human remains that may be unexpectedly discovered during Project implementation to a less than significant level. Consistent with State law, if at any time during grading, human remains are found, the Project is to be conditioned to halt work and contact the Los Angeles County Coroner’s Office. Based on compliance with existing regulations and the implementation of Mitigation Measure CUL-1, the Project’s potential to disturb human remains is considered less than significant with mitigation.

Mitigation Measures
V. (b, c)
CUL-1: Inadvertent Archaeological Finds
If previously unidentified cultural materials are unearthed during construction, work shall be halted in that area until a qualified archaeologist can assess the significance of the find. If human remains are encountered, State Health and Safety Code Section 7050.5 states that no further disturbance shall occur until the County Coroner has made a determination of origin and disposition pursuant to Public Resources Code Section 5097.98. The County Coroner must be notified of the find immediately. If the remains are determined to be prehistoric, the Coroner will notify the Native American Heritage Commission (NAHC), which will determine and notify the Most Likely Descendant (MLD). With the permission of the landowner or his/her authorized representative, the MLD may inspect the site of the discovery. The MLD shall complete the inspection within 48 hours of notification by the NAHC. The MLD may recommend scientific removal and nondestructive analysis of human remains and items associated with Native American burials.

Page 564 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 44 ends

Potentially
Significant
Impact
Less Than
Significant
with Mitigation
Incorporated
Less Than
Significant
Impact
No Impact
VI. Energy – Would the project:
a) Result in potentially significant
environmental impacts due to wasteful,
inefficient, or unnecessary consumption of
energy resources, during project
construction or operation?
b) Conflict with or obstruct a State or Local
plan for renewable energy or energy
efficiency?
Project Impacts and Mitigation Measures
Sources:
• City of Industry 2014 General Plan (adopted June 12, 2014) • California Energy Commission. Clean Energy and Pollution Reduction Act – SB 350. 2022.
• California Energy Commission. Joint Energy Report – SB 100. 2022. • California Department of General Services. California Building Standards Code (Title 24, 2022).
• California Air Resources Board. Guide to Off-Road Vehicle & Equipment Regulations. • Will Serve Documents (Appendix I).

Findings of Fact: The proposed Project includes an annexation, a General Plan Amendment, and a Zone Change that would allow for industrial development consistent with the City of Industry’s Industrial (M) zoning designation. The Project site consists of two parcels: Assessor’s Parcel Number (APN) 8206-027-058, which is currently located within the City of Industry, and APN 8206-027-080, which is located in unincorporated County of Los Angeles, and would be annexed into the City as part of the proposed Project. This IS/MND evaluates the environmental impacts of the specific proposed Project—a new 140,720-square-foot industrial building—representing the reasonably foreseeable development enabled by these entitlements. While the Industrial (M) zone permits a range of uses with potentially greater environmental impacts (e.g., high-cube warehouses or e-commerce centers), this analysis conservatively evaluates the Project as proposed and does not speculate on future or alternative uses. Therefore, the findings of this section reflect the maximum anticipated environmental effects associated with the proposed Project.

The Project site, like the rest of California, is subject to the state's energy policies, which aim to reduce the consumption of non-renewable resources and promote energy efficiency. Key energy resources potentially impacted by the Project include electricity, natural gas, and petroleum-based fuels. These energy resources are essential in the construction and operation of the Project, and

Page 565 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 45 ends

their usage and consumption have been evaluated to ensure that the Project does not result in wasteful or inefficient consumption.

Electricity
Electricity is a man-made resource produced by converting various energy sources, including fossil fuels, solar, geothermal, and wind power, into usable energy. The delivery of electricity is managed by utility companies, such as Southern California Edison (SCE), which operates a system of transmission lines, substations, and transformers to deliver electricity to end users. The Project has received a will-serve letter from SCE and will be supplied with electricity by SCE, meeting the Project’s energy needs during both construction and operation.

Natural Gas
Natural gas is primarily used for space heating, cooking, hot water, and industrial processes.

While California imports natural gas, it has a highly developed network of pipelines for distribution.

Southern California Gas Company (SoCalGas) provided a will serve letter for the Project, and will continue to provide service at the site. Natural gas would be utilized for heating, hot water, and HVAC systems, contributing to the Project’s operational energy consumption.

Petroleum-Based Fuels
Petroleum-based fuels, such as diesel and gasoline, are primarily used in the transportation sector. While the state is actively working to reduce reliance on petroleum, this energy resource remains significant, particularly for the transportation and construction phases of the Project.

Construction activities will rely on petroleum-based fuels for off-road equipment, worker vehicles, and haul trucks for material delivery and waste removal.

Discussion of Impacts
a) Result in potentially significant environmental impacts due to wasteful, inefficient, or unnecessary consumption of energy resources, during project construction or operation? Less than Significant Impact: The proposed Project would impact energy resources during construction and operation. The construction activities for the Project include demolition, site preparation, grading, building construction, paving, and architectural coating. The Project would consume energy resources during construction in three (3) general forms:

1. Petroleum-based fuels used to power off-road construction vehicles and equipment on the Project site, construction worker travel to and from the Project site, as well as delivery and haul truck trips (e.g., hauling of demolition material to off-site reuse and disposal facilities);

2. Electricity associated with the conveyance of water that would be used during Project construction for dust control (supply and conveyance) and electricity to power any necessary lighting during construction, electronic equipment, or other construction activities necessitating electrical power; and,

Page 566 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 46 ends

3. Energy is used in the production of construction materials, such as asphalt, steel, concrete, pipes, and manufactured or processed materials such as lumber and glass.

Construction Related Impacts
Construction of the Project would result in fuel consumption from construction tools and equipment, vendor and haul truck trips, and vehicle trips generated from construction workers traveling to and from the site. Construction activities and corresponding fuel energy consumption would be temporary and localized. The use of diesel fuel and heavy duty equipment would not be a typical condition of the Project. Also, there are no unusual Project characteristics that would cause construction equipment that would be less energy efficient compared with other similar construction sites in other parts of the State.

Electricity and Natural Gas Usage
Southern California Edison (SCE) will provide temporary electric power for as-necessary lighting and electronic equipment. The electricity used for such activities is temporary and is substantially less than that required for Project operation and has a negligible contribution to the Project's overall energy consumption.

Natural gas is not anticipated to be required during construction of the Project. Fuels used for construction would primarily consist of diesel and gasoline, which are discussed below under the "Petroleum Fuel Usage" subsection. Any minor amounts of natural gas that may be consumed as a result of Project construction would be substantially less than that required for Project operation and would have a negligible contribution to the Project's overall energy consumption.

Petroleum Fuel Usage
Off-road heavy-duty construction equipment associated with construction activities would rely on diesel fuel, as well as vendors and haul trucks that would be involved in delivering building materials and removing the demolition debris from the Project site. All construction equipment is subject to the CARB In-Use Off-Road Diesel-Fueled Fleets Regulation. This regulation, which applies to all off-road diesel vehicles 25 horsepower or greater, limits unnecessary idling to 5 minutes, requires all construction fleets to be labeled and reported to CARB, bans Tier 0 equipment, and phases out Tier 1 and Tier 2 equipment (thereby replacing fleets with cleaner equipment), and requires that fleets comply with Best Available Control Technology requirements, which would increase construction equipment fuel efficiency. These limitations on idling vehicles and equipment, and the requirements that equipment must be properly maintained (CCR Title 13, Sections 2449(d)(3) and 2485), would result in fuel savings. Due to the temporary nature of construction, the Project would not result in wasteful, inefficient, and unnecessary consumption of energy. Furthermore, there are no policies at the local level applicable to energy conservation specific to the construction phase.

Page 567 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 47 ends

Operational Related Impacts
Electricity and Natural Gas Usage
SCE and Southern California Gas Company (SoCalGas) would provide electricity and natural gas for the Project. The on-going operation of the proposed industrial facility would require the use of electricity for multiple purposes including, but not limited to, refrigeration, lighting, appliances, and electronics. Natural gas is often used for Heating Ventilation and Air Conditioning (HVAC) systems and hot water heaters and would be required for the operation of the Project. Energy would also be consumed during operations related to water usage, solid waste disposal, landscape equipment and vehicle trips.

According to CEQA Guidelines Appendix F, the goal of conserving energy implies the wise and efficient use of energy, including decreasing overall per capita energy consumption, reducing reliance on natural gas and oil, and increasing reliance on renewable energy sources. The Project will comply with applicable energy efficiency requirements under Title 24 and applicable City business and energy ordinances. As a result, even with the increase in demand for electricity and natural gas, the operation of the Project would not result in inefficient, wasteful, or unnecessary energy use compared with other similar industrial projects in the region. A less than significant impact would occur. b) Conflict with or obstruct a State or Local plan for renewable energy or energy efficiency? Less than Significant Impact: The applicable state plans that address renewable energy and energy efficiency are CAL Green, the California Energy Code, and the California Renewable Portfolios Standard (RPS). Under the California RPS, the State of California is transitioning to renewable energy through California’s Renewable Energy Program.

Renewable sources of electricity include wind, small hydropower, solar, geothermal, biomass, and biogas. Electricity production from renewable sources is generally considered carbon neutral. Executive Order S-1408, signed in November 2008, expanded the state’s RPS to 33 percent renewable power by 2020. This standard was adopted by the legislature in 2011 (SB X1-2). Senate Bill 350 (de Leon) was signed into law September 2015 and establishes tiered increases to the RPS—40 percent by 2024, 45 percent by 2027, and 50 percent by 2030. Senate Bill 350 also set a new goal to double the energy-efficiency savings in electricity and natural gas through energy efficiency and conservation measures.

On September 10, 2018, Governor Brown signed SB 100, which supersedes the SB 350 requirements. Under SB 100, the RPS for public owned facilities and retail sellers consist of 44 percent renewable energy by 2024, 52 percent by 2027, and 60 percent by 2030.

Additionally, SB 100 also established a new RPS requirement of 50 percent by 2026. The bill also established a state policy that eligible renewable energy resources and zero-carbon resources supply 100 percent of all retail sales of electricity to California end-use customers and 100 percent of electricity procured to serve all state agencies by December 31, 2045.

Under SB 100 the state cannot increase carbon emissions elsewhere in the western grid or allow resource shuffling to achieve the 100 percent carbon-free electricity target.

Page 568 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 48 ends

The statewide RPS goal is not directly applicable to individual development projects, but to utilities and energy providers such as Southern California Edison (SCE), which is the utility provider that would fulfill all electricity needs for the proposed Project. Compliance by SCE in meeting the RPS goals would ensure the State in meeting its objective in transitioning to renewable energy. Additionally, the proposed Project would comply with the Building Energy Efficiency Standards and CAL Green. Therefore, implementation of the proposed Project would not conflict with, or obstruct plans for renewable energy and energy efficiency and a less than significant impact would occur.

Page 569 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 49 ends

Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact
No Impact
VII. Geology and Soils– Would the project:
a) Directly or indirectly cause potential
substantial adverse effects, including the
risk of loss, injury, or death involving:
i) Rupture of a known earthquake fault,
as delineated on the most recent
Alquist-Priolo Earthquake Fault
Zoning Map, issued by the State
Geologist for the area or based on
other substantial evidence of a
known fault? Refer to Division of
Mines and Geology Special
Publication 42.
ii) Strong seismic ground shaking?
iii) Seismic-related ground failure,
including liquefaction?
iv) Landslides?
b) Result in substantial soil erosion or the
loss of topsoil?
c) Be located on a geologic unit or soil that is
unstable, or that would become unstable
as a result of the project, and potentially
result in on- or off-site landslide, lateral
spreading, subsidence, liquefaction or
collapse?
d) Be located on expansive soil, as defined
in Table 18-1-B of the Uniform Building
Code (1994), creating substantial direct or
indirect risks to life or property?
e) Have soils incapable of adequately
supporting the use of septic tanks or
alternative wastewater disposal systems
where sewers are not available for the
disposal of wastewater?
f) Directly or indirectly destroy a unique
paleontological resource or site or unique
geologic feature?

Page 570 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 50 ends

Project Impacts and Mitigation Measures
Sources:
• City of Industry 2014 General Plan (adopted June 12, 2014) • Los Angeles County GIS-NET
• California Department of Conservation (CDC). California Earthquake Hazards Zone Application (EQ Zapp). 2021.
• Geotechnical Due Diligence Exploration Proposed Industrial Warehouse Development, 110 South 6th Avenue City of Industry, Los Angeles County, California. Leighton Consulting, Inc. August 27, 2024. (Appendix B)
Findings of Fact: The analysis in this section is based on the Geotechnical Due Diligence Exploration Report (Geotechnical Report) prepared by Leighton Consulting, Inc., dated August 27, 2024 (Appendix B). The Geotechnical Report was peer-reviewed by Terracon Consultants Inc. (Appendix C). Recommendations from the peer review will be incorporated into the final Geotechnical Report as a condition of project approval and prior to the issuance of grading permits.

The Project involves an annexation of one parcel (APN: 8206-027-080) located in Avocado Heights in unincorporated County of Los Angeles into the City of Industry, a General Plan Amendment to an Employment designation, and a ZC to Industrial (M), enabling redevelopment with a 140,720-square-foot industrial building. Although the annexation and ZC are administrative, they allow construction activities that could be influenced by the site’s geologic and soil conditions.

The site is largely flat and previously disturbed, with no mapped active faults, landslide zones, or expansive soils. Adherence to standard engineering practices, including site-specific grading, compaction, erosion control, and compliance with the California Building Code, would minimize geologic and soil-related risks. Therefore, potential impacts from geology and soils associated with the Project would be less than significant.

Faulting and Seismicity
The Project site, like the rest of Southern California, is located within a seismically active region as a result of being located near the active margin between the North American and Pacific tectonic plates. The principal source of seismic activity is movement along the northwest-trending regional faults such as the San Andreas, San Jacinto, and Elsinore fault zones. Annually, these fault systems produce approximately 5 to 35 millimeters of slip between the plates.

The Project site is not included within any Earthquake Fault Zones as established by the Alquist-Priolo Earthquake Fault Zoning Act. Review of geologic literature pertaining to the site area indicates that there are no known active or potentially active faults located within or immediately adjacent to the subject property. The closest known active fault to the Project site is the Whittier fault, which has been mapped approximately 3.4 miles southwest of the site.

Page 571 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 51 ends

Surface Fault Rupture and Ground Shaking
Due to the distance between the Project site and the nearest known active fault, the potential for fault rupture at the site is considered low, and the potential for future ground shaking at the site appears no greater than that at many other sites in southern California (Appendix B).

Liquefaction
Liquefaction and seismic settlement are conditions that can occur under seismic shaking from earthquake events. Liquefaction describes a phenomenon in which saturated, cohesionless soil loses strength during an earthquake as a result of induced shearing strains. Lateral and vertical movements of the soil mass, combined with loss of bearing can result in the event of liquefaction.

Fine, well sorted, loose sand, shallow groundwater conditions, higher intensity earthquakes, and particularly long duration of ground shaking are the requisite conditions for liquefaction.

The Project site is located within a liquefaction hazard zone as mapped by the State of California (Appendix B). Based on the Geotechnical Due Diligence Exploration prepared by Leighton Consulting, dated August 27, 2024, the potential for surface manifestations of liquefaction exists at the site (Appendix B).

Seismically Induced Settlement
Ground accelerations generated from a seismic event can produce settlements in sands or in granular earth materials both above and below the groundwater table. This phenomenon is often referred to as seismic settlement and is most common in relatively clean sands, although it can also occur in other soil materials. Based on Leighton’s analysis, seismic settlement at the site is estimated at approximately 6.1 inches which is considered moderate; however, with the over excavation recommendations provided later in the report, the maximum estimated settlement is reduced to about 5.7 inches. (Appendix B).

Lateral Spreading
Seismically induced lateral spreading involves movement of earth materials due to earth shaking.

Lateral spreading is demonstrated by near-vertical cracks with predominantly horizontal movement of the soil mass involved. For lateral spreading to occur, the liquefiable zone must be continuous, unconstrained laterally, and free to move along gently sloping ground toward an unconfined area.

Discussion of Impacts
a) Directly or indirectly cause potential substantial adverse effects, including the risk of loss, injury, or death involving:
i. Rupture of a known earthquake fault, as delineated on the most recent Alquist-Priolo Earthquake Fault Zoning Map, issued by the State Geologist for the area or based on other substantial evidence of a known fault? Refer to Division of Mines and Geology Special Publication 42.

Page 572 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 52 ends

Less than Significant Impact: The Project site is not located within an Alquist-Priolo Earthquake Fault Zone, as designated by the State Geologist. A geotechnical review confirms that there are no known active or potentially active faults on or immediately adjacent to the site. The nearest mapped fault is the Whittier Fault, located approximately 3.4 miles southwest of the Project site. While the site is not at risk of surface fault rupture, it remains susceptible to ground shaking typical of the seismically active Southern California region. The proposed development will comply with the seismic design provisions of the 2022 California Building Code (CBC), including Section 1808.6.2, which addresses structural safety in seismically active areas. Therefore, the potential for impacts related to fault rupture is considered less than significant. ii. Strong seismic ground shaking?
Less than Significant Impact: The Project site is subject to strong seismic ground shaking and potential damage as a result of seismic activity, which is characteristic of Southern California. Accordingly, proposed construction would be designed and constructed in accordance with applicable portions of Section 1808.6 of the 2022 CBC to ensure that potential impacts are less than significant. iii. Seismic-related ground failure, including liquefaction? Less than Significant Impact with Mitigation Incorporated: Liquefaction occurs when saturated, loose, granular soils lose strength during strong ground shaking, typically within the upper 50 feet below ground surface (Bgs). The Project site was evaluated through multiple phases of geotechnical investigation, including a total of eighteen hollow-stem auger borings drilled between September 2022 and April 2023, to depths ranging from 10 to 51.5 feet Bgs. Standard Penetration Tests (SPTs) and sampling were conducted throughout to characterize subsurface conditions.

The liquefaction analysis determined that while some liquefiable soils may be present onsite, the risk can be mitigated through engineering design. Specifically, it is feasible to support the proposed structures on shallow foundations placed atop a layer of newly compacted structural fill over liquefiable soils, as detailed in Mitigation Measure GEO-1.

The Project’s structural engineer will confirm that the anticipated seismic settlements are within acceptable limits, and the foundation design will meet the requirements of Section 1808.6 of the 2022 California Building Code (CBC). With implementation of Mitigation Measure GEO-1, the potential for seismic-related ground failure, including liquefaction, would be reduced to a less than significant level. iv. Landslides?
No Impact: Landslides result from the downward movement of earth or rock materials that have been influenced by gravity. In general, landslides occur due to numerous factors including steep slope conditions, erosion, rainfall, groundwater, adverse geologic structure, and grading impacts. The Project site is relatively flat and not considered at risk for landslides. Therefore, no impact would occur.

Page 573 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 53 ends

b) Result in substantial soil erosion or the loss of topsoil? No Impact: The Applicant proposes to demolish the existing onsite buildings and construct one (1) new industrial building totaling approximately 140,720 square feet. During construction, erosion control measures will be implemented consistent with the 2022 California Building Code (CBC), which requires that the faces of all cut and fill slopes be prepared and maintained to control erosion. Additionally, the Project will be subject to National Pollutant Discharge Elimination System (NPDES) requirements, including preparation and implementation of a Storm Water Pollution Prevention Plan (SWPPP). The SWPPP will identify and incorporate Best Management Practices (BMPs) to minimize soil erosion, sedimentation, and loss of topsoil during construction activities.

Following construction, the site will be fully developed with impervious surfaces and landscaping, and no exposed soils will remain. The Project will also comply with all applicable City ordinances and standards related to erosion and stormwater management. Therefore, the Project would not result in substantial soil erosion or the loss of topsoil, and impacts would be less than significant.
c) Be located on a geologic unit or soil that is unstable, or that would become unstable as a result of the project, and potentially result in on- or off-site landslide, lateral spreading, subsidence, liquefaction or collapse?
Less than Significant Impact with Mitigation Incorporated: Based on the geotechnical investigation conducted by Leighton (Appendix B), the Project site is underlain by artificial fill over native Quaternary alluvial fan and valley deposits. The artificial fill consists of loose to medium dense clayey sand and silty materials encountered at depths of approximately 4 to 7 feet below ground surface (Bgs) and is considered undocumented due to the lack of construction records. Native soils generally consist of loose to dense granular materials and stiff sandy clay with low expansion potential and variable in-situ moisture content.

Subsurface exploration and laboratory testing identified moderately compressible soils with a

1.1% collapse potential when wetted, indicating a potential for minor settlement under increased loads. However, standard penetration test (SPT) results indicate that the onsite granular soils are generally dense, reducing the likelihood of collapse or significant settlement.

Potentially liquefiable layers were identified between 40 and 50 feet Bgs, primarily consisting of silty sands. However, these deeper layers are overlain by substantial non-liquefiable soils, and the empirical assessment suggests a low likelihood of surface expression or structural damage from liquefaction.

To address these geotechnical impacts, Mitigation Measure GEO-1 requires implementation of remedial grading including over-excavation and placement of compacted structural fill, field verification of subsurface conditions, and geotechnical observation and testing throughout site preparation. These procedures would mitigate risks associated with soil collapse, liquefaction, or settlement. Additionally, soils were found to be highly corrosive to ductile iron and other ferrous metals, and the use of non-ferrous piping materials or protective measures such as dielectric wrap or sleeves will be implemented under Mitigation Measure GEO-1.

Page 574 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 54 ends

The Project will comply with applicable provisions of the California Building Code (CBC) and other relevant regulations that ensure structural design accounts for potential soil and geologic hazards. With incorporation of mitigation and standard regulatory compliance, the Project would not be located on or create unstable geologic units or soils that could result in on- or off-site landslides, lateral spreading, subsidence, liquefaction, or collapse. Therefore, impacts would be less than significant with mitigation incorporated. d) Be located on expansive soil, as defined in Table 18-1-B of the Uniform Building Code (1994), creating substantial direct or indirect risks to life or property? Less than Significant Impact: Expansive soils, which swell when wet and shrink when dry, can cause damage to structures such as foundations and slabs-on-grade if not properly addressed. These impacts are typically associated with soils containing high clay content.

However, based on subsurface borings and laboratory testing conducted by Leighton (Appendix B), the onsite soils—composed of silty sand (SM), clayey sand (SC), poorly graded sand (SP), and sandy clay (CL)—are anticipated to have low expansion potential.

Additionally, although undocumented artificial fill was encountered onsite to depths of up to seven feet, it does not exhibit expansive properties. This fill will be removed or reconditioned as part of standard grading and earthwork procedures. Given these findings and the Project’s required compliance with applicable provisions of the California Building Code (CBC), the presence of expansive soils does not present a substantial risk. Therefore, impacts would be less than significant, and no mitigation is required.
e) Have soils incapable of adequately supporting the use of septic tanks or alternative wastewater disposal systems where sewers are not available for the disposal of wastewater? No Impact: The Project does not include a septic tank and would connect to the existing sewer line in Valley Boulevard. No impact would occur.
f) Directly or indirectly destroy a unique paleontological resource or site or unique geologic feature?
Less than Significant Impact with Mitigation Incorporated: No paleontological resources have been discovered or are known to exist on the site. Implementation of the Project will require some grading and installation of underground service facilities. Given the highly disturbed condition of the Project site from the previous developments, the discovery of paleontological resources is unlikely. Implementation of the Project is not anticipated to destroy a unique paleontological resource or site directly or indirectly; nonetheless Mitigation Measure GEO-2 is identified and discussed below to ensure that in the event that unanticipated resources are encountered during excavation, impacts would remain less than significant. Mitigation Measure GEO-2 (as set forth below) has been included to ensure that any impact is reduced to a less than significant impact with mitigation incorporated into the Project.

Page 575 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 55 ends

Mitigation Measures
VII. (a (iii), c)
GEO-1: General Earthwork and Grading
The Project shall incorporate applicable recommendations provided in the Geotechnical Due Diligence Exploration Report prepared by Leighton Consulting, Inc. dated August 27, 2024 (Appendix B). The recommendations are presented in Section

3.0 Conclusions and Recommendations of the report under the following subheadings: General Earthwork and Grading, Site Preparation, Removal of Undocumented Artificial Fill, Over excavation and Recompaction, Mitigation of Potential Seismic Settlement, Fill Placement and Compaction, Import Fill Soil, Shrinkage and Subsidence, Rippability and Oversized Material, Shallow Foundation Recommendations, Minimum Embedment and Width, Allowable Bearing, Lateral Load Resistance, Increase in Bearing and Friction - Short Duration Loads, Settlement Estimates, Recommendations for Slabs-On-Grade, Seismic Design Parameters, Retaining Walls, Preliminary Pavement Design, Infiltration Recommendations, Temporary Excavations, Trench Backfill, Geogrid Installation, Surface Drainage, Sulfate Attack and Corrosion Protection, Additional Geotechnical Services (pages 16- 34).

VII. (f)
GEO-2: Inadvertent Paleontological Discovery
In the event that paleontological resources are inadvertently discovered during ground disturbing activities, a qualified paleontologist shall document the discovery as appropriate, evaluate the potential resource, and assess the significance of the find under the criteria set forth in CEQA Guidelines Section 15064.5.

Page 576 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 56 ends

Potentially
Significant
Impact
Less Than
Significant
with Mitigation
Incorporated
Less Than
Significant
Impact
No Impact
VIII. Greenhouse Gas Emissions – Would the project:
a) Generate greenhouse gas emissions either
directly or indirectly, that may have a
significant impact on the environment?
b) Conflict with an applicable plan, policy or
regulation adopted for the purpose of
reducing the emissions of greenhouse
gases?
Project Impacts and Mitigation Measures
Sources:
• City of Industry 2014 General Plan (adopted June 12, 2014) • Los Angeles County GIS-NET
• 6th Street Air Quality and Greenhouse Gas Assessment. Urban Crossroads, Inc.

December 24, 2025. (Appendix A)
Findings of Fact: The City has not adopted its own GHG significance threshold and therefore relies on the South Coast Air Quality Management District’s (SCAQMD) interim threshold of 3,000 MTCO₂e per year for residential and commercial projects. This threshold is based on a 90 percent emissions “capture” rate, which targets larger GHG-emitting projects for detailed analysis, while excluding smaller projects that contribute minimally to statewide emissions.

This approach, supported by the California Air Pollution Control Officers Association (CAPCOA) and CEQA Guidelines Section 15064.7(c), ensures compliance with CEQA by using a threshold grounded in substantial evidence and accepted expert recommendations. Accordingly, the Project’s GHG emissions are evaluated against this 3,000 MTCO₂e/year threshold to determine potential significance.

The proposed Project includes the annexation of one parcel, a General Plan Amendment, and a Zone Change that would allow for industrial development consistent with the City of Industry’s Industrial (M) zoning district. The Project site consists of two parcels: Assessor’s Parcel Number (APN) 8206-027-058, which is currently located within the City of Industry, and APN 8206-027- 080, which is located in unincorporated County of Los Angeles, and would be annexed into the City as part of the proposed Project. This IS/MND evaluates the environmental impacts of the specific proposed Project—a new 140,720-square-foot industrial building—representing the reasonably foreseeable development enabled by these entitlements. While the Industrial (M) zone permits a range of uses with potentially greater environmental impacts (e.g., high-cube warehouses or e-commerce centers), this analysis conservatively evaluates the Project as proposed and does not speculate on future or alternative uses. Therefore, the findings of this

Page 577 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 57 ends

section reflect the maximum anticipated environmental effects associated with the proposed Project.

A Greenhouse Gas Analysis prepared by Urban Crossroads (Appendix A) estimates both construction and operational GHG emissions associated with the Project. Construction emissions are amortized over a 30-year Project lifespan, in accordance with SCAQMD recommendations. The Project would generate an estimated 1,418.23 MTCO₂e per year, which is below the SCAQMD threshold of 3,000 MTCO₂e per year. Therefore, based on substantial evidence, the Project would result in a less than significant impact related to greenhouse gas emissions.

Discussion of Impacts
a) Generate greenhouse gas emissions either directly or indirectly, that may have a significant impact on the environment?
Less than Significant Impact: The Air Quality and Greenhouse Gas Analysis prepared by Urban Crossroads (Appendix A), provides the estimated GHG emissions that will result from Project construction and operation. Construction related GHG emissions are quantified and amortized over the life of the Project, which is identified as a 30-year period, in accordance with SCAQMD recommendation. Project operational emissions would consist of mobile sources, area source, energy source, water supply and treatment, waste, and on-site equipment. As shown in Table 8-1, the Project would generate 1,418.23 MTCO2e per year. According to the threshold of significance, a cumulative global climate change impact would occur if the GHG emissions created from construction and on-going operations of the proposed Project would exceed the SCAQMD threshold of 3,000 MTCO2e per year. Therefore, since the Project will not exceed the threshold of significance, the Project does not have the potential to result in a cumulatively considerable impact with respect to GHG emissions and a less than significant impact would occur.

Table 8-1 Total Project Greenhouse Gas Emissions
Source
Emissions (lbs/day)
CO2T CH4 N2O R Total
CO2e
Annual construction
emissions amortized over
30 years

21.08 9.20E-04 1.40E-03 1.18E-02 21.54
Mobile 1,004.93 0.04 0.13 1.19 1,045.78
Area 2.85 0.00 0.00 0.00 2.86
Energy 148.88 0.01 0.00 0.00 149.54
Water 56.56 1.06 0.03 0.00 90.73
Waste 11.80 1.18 0.00 0.00 41.29
Stationary 19.04 0.00 0.00 0.00 19.10
Cargo Handling
Equipment 0.00 0.00 0.00 0.00 47.38
Total CO2e (All Sources) 1,418.23

Page 578 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 58 ends

The estimated GHG emissions from the existing buildings are summarized in Table 13.

Detailed operation model outputs for the existing buildings are presented in Appendix 2 of the Air Quality and Greenhouse Gas Assessment (Appendix A).

Table 8-2 Existing Building GHG Emissions
Source
Emissions (lbs/day)
CO2T CH4 N2O R Total
CO2e
Mobile 1,481.63 0.06 0.19 1.99 1,542.04
Area 4.05 0.00 0.00 0.00 4.06
Energy 395.96 0.03 0.00 0.00 397.38
Water 79.19 1.51 0.04 0.00 127.62
Waste 16.73 1.67 0.00 0.00 58.54
Total CO2e (All Sources) 2,129.64
Table 8-3 shows the Project is anticipated to generate less GHG emissions per day for as compared to emissions generated by the existing buildings. The Project would result in approximately a net decrease of 711.41 MTCO2e/yr; the proposed Project would not exceed the SCAQMD’s numeric threshold of 3,000 MTCO2e/yr. Thus, the Project would result in a less than significant impact with respect to GHG emissions.

Table 8-3 Project Net New GHG Emissions
Source Total CO2e
Proposed Project 1,418.23
Existing Buildings 2,129.64
Net Emissions (Proposed-Existing) -711.41
b) Conflict with an applicable plan, policy or regulation adopted for the purpose of reducing the emissions of greenhouse gases?
Less than Significant Impact: Pursuant to 15604.4 of the CEQA Guidelines, a lead agency may rely on qualitative analysis or performance-based standards to determine the significance of impacts from GHG emissions. The 2022 Scoping Plan for Achieving Carbon Neutrality (2022 Scoping Plan) lays out a path to achieve targets for carbon neutrality and reduce anthropogenic greenhouse gas (GHG) emissions by 85 percent below 1990 levels no later than 2045, as directed by Assembly Bill 1279. The actions and outcomes in the plan will achieve significant reductions in fossil fuel combustion by deploying clean technologies and fuels, further reductions in short-lived climate pollutants, support for sustainable development, increased action on natural and working lands to reduce emissions and sequester carbon, and the capture and storage of carbon. Finally, the Project site consists of two parcels: one currently within the City of Industry and one located in unincorporated County of Los Angeles. The County parcel (APN 8206-027-080) is

Page 579 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 59 ends

proposed for annexation into the City, along with a General Plan Amendment and Zone Change to apply the City’s Employment land use designation and Industrial (M) zoning district. The GHG analysis evaluates the Project as a whole based on the land use designations and development standards under the City of Industry, reflecting the buildout scenario post-annexation. Therefore, the Project is consistent with the proposed general plan land use designation of Employment, density, building intensity, and applicable policies specified for the Project area in SCAG's Sustainable Community Strategy/Regional Transportation Plan, which pursuant to SB 375 calls for the integration of transportation, land-use and housing policies to plan for achievement of the GHG-emissions target for the region. Thus, a less than significant impact related to GHG emissions from Project construction and operation would occur and no mitigation is required.

Page 580 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 60 ends

Potentially
Significant
Impact
Less Than
Significant
with Mitigation
Incorporated
Less Than
Significant
Impact
No Impact
IX. Hazards and Hazardous Materials – Would the project:
a) Create a significant hazard to the public or
the environment through the routine
transport, use, or disposal of hazardous
materials?
b) Create a significant hazard to the public or
the environment through reasonably
foreseeable upset and accident conditions
involving the release of hazardous materials
into the environment?
c) Emit hazardous emissions or handle
hazardous or acutely hazardous materials,
substances, or waste within one-quarter mile
of an existing or proposed school?
d) Be located on a site which is included on a
list of hazardous materials sites compiled
pursuant to Government Code Section
65962.5 and, as a result, would it create a
significant hazard to the public or the
environment?
e) For a project located within an airport land
use plan or, where such a plan has not been
adopted, within two miles of a public airport
or public use airport, would the project result
in a safety hazard or excessive noise for
people residing or working in the project
area?
f) Impair implementation of or physically
interfere with an adopted emergency
response plan or emergency evacuation
plan?
g) Expose people or structures, either directly
or indirectly, to a significant risk of loss, injury
or death involving wildland fires?

Page 581 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 61 ends

Project Impacts and Mitigation Measures
Sources:
• City of Industry 2014 General Plan (adopted June 12, 2014) • Los Angeles County GIS-NET
• Phase I Environmental Site Assessment & Limited Phase II Subsurface Investigation Report. Hillmann Consulting LLC. September 18, 2024. (Appendix C) • Hazardous Materials Survey Report Valley Centre Business Park. Partner Engineering and Science, Inc. July 26, 2024. (Appendix D)
• County of Los Angeles Operational Area Emergency Operations Plan • Fire Hazard Severity Zones in State Responsibility Area Findings of Fact: The analysis in this section is based on the Phase I Environmental Site Assessment (ESA) prepared by Hillman Consulting LLC, dated September 18, 2024, the Limited Phase II Subsurface Investigation Report prepared by Hillman Consulting, dated June 1, 2023 (Appendix D), and the Hazardous Materials Survey Report prepared by Partner Engineering and Science, dated July 26, 2024 (Appendix F). The Phase I ESA and Phase II Report were peer-reviewed by Terracon Consultants (Appendix E), and the Hazardous Materials Survey Report was also peer-reviewed by Terracon (Appendix G). As part of the peer review process, Terracon recommended that a supplemental asbestos and lead-based paint survey be conducted. This recommendation will be incorporated as a condition of Project approval and will be completed prior to the issuance of grading permits.

The Project involves the annexation of one parcel (APN: 8206-027-080) located in Avocado Heights, in unincorporated County of Los Angeles, into the City of Industry, a General Plan Amendment to Employment, and a ZC to Industrial (M), allowing redevelopment with a 140,720- square-foot industrial building. While the annexation and ZC are administrative, they enable construction and future operations that could involve hazardous materials. The site is currently developed, and no known hazardous materials releases, underground storage tanks, or other contamination have been documented on-site. Standard construction and operational practices— including proper handling, storage, and disposal of hazardous materials, adherence to OSHA regulations, and implementation of a spill prevention plan—would prevent or minimize potential risks. With the mitigation measures stated below, hazards and hazardous materials impacts associated with the Project would be less than significant.

The Phase I ESA was conducted in accordance with ASTM Practice E1527-21, to evaluate whether any recognized environmental conditions (RECs) are present on the Project site. RECs are defined as the presence or likely presence of hazardous substances or petroleum products on a property under conditions that indicate a release, past release, or material threat of a release into structures, soil, groundwater, or surface water. The Phase I ESA identified one controlled REC (CREC) associated with the historical light industrial use of the property, and was further analyzed in a Limited Phase II Subsurface Investigation to assess potential impacts from past operations such as printing, light manufacturing, machine servicing, and oil supply activities.

Additionally, the Project site lies within the Puente Valley/San Gabriel Valley Area 4 Superfund site, a USEPA-designated operable unit (OU) within a regional groundwater contamination plume.

Contaminants of concern in this OU include volatile organic compounds (VOCs) such as

Page 582 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 62 ends

trichloroethene (TCE), tetrachloroethene (PCE), 1,4-dioxane, perchlorate, and hexavalent chromium. Monitoring wells near the Project site (MW-13 and MW-14) show VOC concentrations below maximum contaminant levels, and the groundwater table is located at approximately 50 to 60 feet below grade. No evidence suggests that the Project site has contributed to this regional contamination. Ongoing remediation efforts are being overseen by the USEPA.

The Hazardous Materials Survey identified the presence of suspect asbestos-containing materials (ACMs), lead-based paint (LBP), and universal waste in the buildings proposed for demolition. These findings are consistent with structures of this age and use, and further asbestos and lead surveys will be required as a condition of approval.

Historically, the site was used for agricultural purposes until 1964, but the potential for pesticide contamination in shallow soils is considered low due to grading and redevelopment since that time. Thus, agricultural use is not considered a REC. However, the adjoining property at 14505 Proctor Avenue—approximately 700 feet southeast of the Project site—is identified as a REC.

This former tank farm facility had a release of petroleum and VOCs, followed by vapor extraction remediation. A Land Use Covenant was recorded in 2012, and the case was closed by the RWQCB. While remediation has been completed, due to its proximity and the potential for vapor intrusion in the southeastern portion of the Project site, this off-site source is considered a REC in connection with the Project.

Discussion of Impacts
a) Create a significant hazard to the public or the environment through the routine transport, use, or disposal of hazardous materials?
Less than Significant Impact with Mitigation Incorporated: Demolition and construction activities associated with the Project would involve the temporary use and storage of hazardous materials such as fuels, lubricants, solvents, cleaners, and paints. These materials would be used in accordance with applicable federal, state, and local regulations including those administered by the Department of Toxic Substances Control (DTSC), U.S.

Environmental Protection Agency (EPA), U.S. Department of Transportation (USDOT), and the Occupational Safety and Health Administration (OSHA). Compliance with these regulations would ensure that hazardous materials are handled and disposed of properly to minimize public or environmental risk.

The Hazardous Materials Survey Report identified asbestos-containing materials (ACMs), lead-based paint (LBP), and universal waste (including fluorescent lightbulbs, ballasts, mercury switches, solvents, and gas cylinders) within the buildings proposed for demolition.

Without proper handling, these materials could pose a risk during demolition. However, implementation of Mitigation Measures HAZ-1 and HAZ-2 will ensure the safe removal and disposal of these materials by certified professionals in accordance with applicable regulations, resulting in less than significant impacts.

Operation of the Project (a new industrial building) is not anticipated to result in routine transport or use of hazardous materials beyond common commercial and janitorial products.

Any future tenants would be required to comply with hazardous applicable materials regulations. Therefore, impacts would be less than significant with mitigation incorporated.

Page 583 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 63 ends

b) Create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the environment?
Less than Significant Impact with Mitigation Incorporated: The Phase I ESA identified one on-site Controlled Recognized Environmental Condition (CREC) associated with past light industrial uses. A Limited Phase II Investigation found no substantial soil or groundwater contamination resulting from past operations. In addition, the Project site is within the Puente Valley/San Gabriel Valley Area 4 Superfund site; however, groundwater contamination is located approximately 50–60 feet below grade, and monitoring wells (MW-13 and MW-14) show VOC concentrations below maximum contaminant levels. An off-site REC—14505 Proctor Avenue—is a former tank farm with a history of petroleum and VOC releases. Though this site is now closed and under a Land Use Covenant, the southeastern portion of the Project site may still be affected by vapor intrusion risks. Therefore, Mitigation Measure HAZ-3 will be implemented to require the preparation of a Soil Management Plan (SMP) and, if warranted, a Vapor Intrusion Mitigation Plan (VIMP) prior to ground disturbance.

Routine operations are not expected to result in significant hazardous material use or risk of accidental release. Any minor use or storage would be subject to OSHA and local Fire Department regulations. With adherence to applicable regulations and safety protocols, impacts would be less than significant with mitigation incorporated. c) Emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste within one-quarter mile of an existing or proposed school? Less than Significant Impact: The nearest school (Nelson Elementary School) is approximately 0.6 miles from the Project site. No schools are located within 0.25 miles. As such, the Project is not expected to emit hazardous emissions or handle acutely hazardous materials near a school. Compliance with applicable health and safety regulations further ensures impacts would be less than significant.
d) Be located on a site which is included on a list of hazardous materials sites compiled pursuant to Government Code Section 65962.5 and, as a result, would it create a significant hazard to the public or the environment?
Less than Significant Impact: A review of the Cortese List (Government Code Section 65962.5) databases conducted as part of the Phase I ESA concluded that the Project site is not identified on any listed hazardous materials site. Although the site lies within the Puente Valley/San Gabriel Valley Area 4 Superfund operable unit due to regional groundwater contamination, the Project site itself is not known to have contributed to the contamination. EPA oversight and groundwater monitoring data from nearby wells indicate VOC levels are below maximum contaminant levels (MCLs), and the groundwater is approximately 50–60 feet below ground surface. Therefore, no significant hazard to the public or environment would occur.
e) For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project result in a safety hazard or excessive noise for people residing or working in the project area?

Page 584 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 64 ends

Less than Significant Impact: The Project is not located within an airport land use plan or within two miles of a public airport. The nearest airport, San Gabriel Valley Airport, is approximately 4.6 miles northwest of the site. The closest heliport is the LA County Sheriff’s Department Heliport located approximately 1.3 miles south of the Project site; however, this is a restricted-use facility that serves emergency and law enforcement operations and is not considered a public use airport. As such, the Project is not subject to safety zones or compatibility policies under an adopted airport land use plan, nor is it within an area of potential excessive aircraft noise exposure. No impacts associated with airport-related safety hazards or excessive noise are anticipated.
f) Impair implementation of or physically interfere with an adopted emergency response plan or emergency evacuation plan?
No Impact: The Project is located within the jurisdiction of the Los Angeles County Operational Area Emergency Response Plan (OAERP), which coordinates emergency response efforts across all cities and unincorporated areas within the County. The OAERP outlines roles, responsibilities, and procedures for effective response to natural and human-made disasters. The Project would not interfere with any adopted emergency response or evacuation plans. The site is accessible via existing roadways, and Project design will comply with local access standards for emergency vehicles. The Project does not propose any changes to regional circulation or infrastructure that would block or hinder evacuation routes or emergency vehicle access. Therefore, implementation of the Project would not impair emergency response or evacuation, and no impact would occur. g) Expose people or structures, either directly or indirectly, to a significant risk of loss, injury or death involving wildland fires?
Less than Significant Impact: The Project site is not located in or near a Very High Fire Hazard Severity Zone. The nearest such area is located approximately 1.1 miles southwest.

The Project is located in an urbanized area and is not adjacent to wildlands. Therefore, the risk from wildland fires is considered less than significant.

Mitigation Measures
IX. (a & b)
HAZ-1: Hazardous Materials Abatement and Disposal
The Project Applicant shall ensure that all ACMs and LBP identified in the Hazardous Materials Survey Report (Appendix D) are handled and disposed of in accordance with all applicable federal, state, and local regulations, including but not limited to:
• EPA NESHAP regulations (40 CFR 61, Subpart M),
• OSHA standards for asbestos (29 CFR 1910.1001 and 1926.1101), • OSHA standards for lead (29 CFR 1926.62), and
• SCAQMD Rule 1403.

Page 585 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 65 ends

All ACMs shall be removed by a certified asbestos abatement contractor prior to demolition. Additional inspections shall be conducted once the buildings are vacated. Any additional suspect materials exposed during demolition shall be tested and properly managed. LBP impacts shall be managed with protective measures including engineering controls, respiratory protection, and personal protective equipment.

HAZ-2: Universal Waste
Prior to demolition, the Project Applicant shall ensure the proper removal, recycling, or disposal of all universal waste materials identified in the Hazardous Materials Survey (Appendix D), including fluorescent lightbulbs, ballasts, HVAC equipment, gas cylinders, solvents, and electronics. A licensed hazardous waste hauler shall be retained to ensure proper handling and disposal in compliance with DTSC regulations.

IX. (c)
HAZ-3: Preparation and Implementation of Soil Management Plan (SMP) Prior to any ground-disturbing activities associated with future development, the Project Applicant shall retain a qualified environmental professional to prepare a Soil Management Plan (SMP) to address potential hazardous materials, including residual volatile organic compounds (VOCs) in soil gas, per- and polyfluoroalkyl substances (PFAS) in soil, and hydrocarbon-impacted soil identified along the eastern portion of the site. Due to the potential for vapor intrusion from off-site sources, the SMP shall include an evaluation of vapor intrusion risk by a qualified environmental professional. If vapor intrusion is determined to be a concern based on applicable screening levels and site conditions, a Vapor Intrusion Mitigation Plan (VIMP) shall be prepared and implemented. The VIMP shall identify appropriate design features or controls (e.g., vapor barriers or sub-slab depressurization systems) to protect future occupants from potential vapor intrusion. The evaluation and, if warranted, the VIMP shall be submitted to the City for review and approval prior to issuance of grading permits, and all applicable measures shall be implemented during site development.

The SMP shall outline procedures for the proper characterization, handling, storage, and disposal of contaminated soil during earthwork activities. The SMP shall include worker health and safety protocols, soil stockpiling and segregation guidelines, contingency measures for unknown contamination, and regulatory notification procedures, as applicable. The SMP (and VIMP, if applicable) shall be submitted to the City for review and approval prior to issuance of grading permits, and all provisions of the approved SMP shall be implemented during site development.

Page 586 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 66 ends

Potentially
Significant
Impact
Less Than
Significant
with Mitigation
Incorporated
Less Than
Significant
Impact
No Impact
X. Hydrology and Water Quality – Would the project:
a) Violate any water quality standards or waste
discharge requirements or otherwise substantially
degrade surface or groundwater quality?
b) Substantially decrease groundwater supplies or
interfere substantially with groundwater recharge
such that the project may impede sustainable
groundwater management of the basin?
c) Substantially alter the existing drainage pattern of the site or area, including through the alteration of
the course of a stream or river or through the
addition of impervious surfaces, in a manner which
would:
i) result in substantial erosion or siltation on- or
off-site;
ii) substantially increase the rate or amount of
surface runoff in a manner which would result
in flooding on- or offsite;
iii) create or contribute runoff water which would
exceed the capacity of existing or planned
stormwater drainage systems or provide
substantial additional sources of polluted
runoff; or
iv) impede or redirect flows?
d) In flood hazard, tsunami, or seiche zones, risk
release of pollutants due to project inundation?
e) Conflict with or obstruct implementation of a water
quality control plan or sustainable groundwater
management plan?
Project Impacts and Mitigation Measures
Sources:

Page 587 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 67 ends

• City of Industry 2014 General Plan (adopted June 12, 2014) • Department of Homeland Security. FEMA Flood Map Service Center. December 2021. • San Gabriel Valley Water Company, 2020 Urban Water Management Plan Suburban Water Systems (UWMP). June 2021.
• Phase I Environmental Site Assessment & Limited Phase II Subsurface Investigation Report. Hillmann Consulting LLC. September 18, 2024. (Appendix C) • WQMP Report for Valley Center, David Evans and Associates, Inc. July 2025. (Appendix E)
• Hydrology Report for Valley Center, David Evans and Associates, Inc. July 2025. (Appendix F)
Findings of Fact: To evaluate potential impacts related to hydrology and water quality, the following technical studies were prepared for the Project: Water Quality Management Plan (WQMP) prepared by David Evans and Associates, Inc., dated July 2025 (Appendix E); Hydrology Report prepared by David Evans and Associates, Inc., dated July 2025 (Appendix F). These reports provide site-specific analysis of surface water hydrology, stormwater runoff, drainage infrastructure, and compliance with regional water quality requirements. Recommendations identified in the peer review documents have been incorporated into this section as mitigation measures to ensure all hydrology and water quality-related impacts remain less than significant.

The Project involves the annexation of one parcel (APN: 8206-027-080) located in Avocado Heights, in unincorporated County of Los Angeles, into the City of Industry, a General Plan Amendment to Employment, and a ZC to Industrial (M), enabling redevelopment with a 140,720- square-foot industrial building. Although the annexation and ZC are administrative, they facilitate construction and operation that could affect hydrology and water quality. The site is currently developed and mostly impervious, draining to existing stormwater systems. Construction would be managed through implementation of standard Best Management Practices (BMPs) for erosion and sediment control, and post-construction runoff would be addressed in accordance with municipal stormwater requirements. With the mitigation measures as stated below, potential impacts on hydrology and water quality would be less than significant.

The City lies within the San Gabriel River Watershed, and the San Gabriel River is the main drainage for the watershed. Major tributaries to the San Gabriel River along its path to the Pacific Ocean include Walnut Creek, San Jose Creek, Coyote Creek, and numerous storm drainage structures. The watershed in Los Angeles County is under the authority of the Los Angeles Regional Water Quality Control Board (LARWQCB). The County of Los Angeles Department of Public Works leads the planning and implementation of the San Gabriel River Watershed. The primary receiving water body for the majority of the City is San Jose Creek. The San Gabriel Basin aquifer, which encompasses approximately 170 square miles, is the primary groundwater and drinking water source for the San Gabriel Valley.

Flood Zones
The Project site is located in FEMA Flood Zone X (area of 0.2% annual chance flood) according to Figure 15 of the General Plan, which is described as an area determined to be outside of the 100- and 500-year floodplains with a minimal flood hazard. According to the City’s General Plan, Figure 16 “Dam Inundation Hazards” Map, the Project site is located within the Puddingstone Dam Inundation Area.

Page 588 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 68 ends

Water Quality
A WQMP was prepared by David Evans & Associates, Inc. in July 2025 (Appendix E). A Low Impact Development (LID) Plan is incorporated as a required component of the WQMP, consistent with the Los Angeles County MS4 Permit requirements. The LID plan complies with the standard Best Management Practice (BMP) requirements set forth by the Los Angeles Regional Water Quality Control Board. Additionally, the LID plan sets forth Source Control BMPs, non-structural BMPs, structural BMPs, and inspection/maintenance responsibilities for the Project.

Groundwater
The Project site is located within the Puente Valley Operable Unit of the San Gabriel Valley (Area 4) Superfund Site, a region with documented VOC contamination in the deep regional aquifer.

However, site-specific investigations, including a Phase I ESA and Limited Phase II, found no evidence of groundwater impacts from past uses at the Project site. Given the depth of the groundwater table and the absence of site-related releases, the Project would not impact groundwater quality.

Discussion of Impacts
a) Violate any water quality standards or waste discharge requirements or otherwise substantially degrade surface or groundwater quality?
Less than Significant Impact with Mitigation Incorporated: The Project is considered a redevelopment project that would alter more than 50 percent of the existing impervious surface area and replace over 5,000 square feet of impervious surface on a previously developed site. Although the Project qualifies as redevelopment under the MS4 Permit, it remains subject to post-construction stormwater quality requirements.

A WQMP and Hydrology Report were prepared by David Evans and Associates, Inc. in July 2025 (Appendices E and F). are incorporated into the LID Plan and Mitigation Measures HYD-1 through HYD-3 as set forth below.

The WQMP includes the implementation of Source Control, Non-Structural, and Structural Best Management Practices (BMPs), including infiltration via two underground corrugated metal pipe (CMP) chambers designed to retain the 85th percentile stormwater event. The Project will also include pretreatment devices certified under the Washington State Department of Ecology TAPE Program. Although California does not have an equivalent certification program, the TAPE Program is recognized in the MS4 Permit as an acceptable standard for evaluating the performance of flow-based treatment BMPs, and its use ensures that the selected devices meet rigorous pollutant removal criteria. The Project will conform to the following permits and regulatory requirements:
• MS4 Permit Compliance (Order No. R4-2021-0105, NPDES Permit No.

CAS004004): Applicant shall prepare and submit a complete LID Plan for City review and approval prior to issuance of grading permits.
• Construction General Permit (CGP): Applicant shall prepare a Stormwater Pollution

Page 589 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 69 ends

Prevention Plan (SWPPP) and obtain coverage under the CGP prior to the start of construction.
• Industrial General Permit (IGP): Applicant shall obtain coverage under the IGP for long-term operational stormwater discharge control.

The implementation of these regulatory controls and mitigation measures will ensure that impacts to water quality will be reduced to a less-than-significant level. b) Substantially decrease groundwater supplies or interfere substantially with groundwater recharge such that the project may impede sustainable groundwater management of the basin?
Less than Significant Impact: The Project is located within the service area of San Gabriel Valley Water Company, which relies on the Main San Gabriel and Central Groundwater Basins, supplemented by imported water and emergency interconnections. According to the 2020 Urban Water Management Plan, the water provider has adequate supply to meet demand through at least 2045, including during drought periods.

The redevelopment would reduce the total building footprint from 199,840 square feet to 140,720 square feet, and incorporate LID features that allow for on-site stormwater infiltration, supporting natural groundwater recharge. Given the site’s current fully developed condition, the Project is not anticipated to adversely affect groundwater resources or aquifer levels and a less than significant impact would occur.
c) Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river or through the addition of impervious surfaces, in a manner which would:
i) result in substantial erosion or siltation on- or off-site; ii) substantially increase the rate or amount of surface runoff in a manner which would result in flooding on- or offsite; or
iii) create or contribute runoff water which would exceed the capacity of existing or planned stormwater drainage systems or provide substantial additional sources of polluted runoff?
iv) Impede or redirect flows?
Less than Significant Impact: The following analysis addresses checklist items X.c) i-iv. The Project site is currently developed and lacks natural streams or water courses.

Demolition and redevelopment would not introduce substantial changes to surface hydrology. The new layout would reduce the overall building footprint and incorporate subsurface infiltration chambers (Basins A and B) designed to manage and infiltrate the 85th percentile storm onsite. Overflow from larger events such as the 50-year storm would be directed to existing City drainage infrastructure, consistent with City design standards.

Drainage calculations, grading design, and stormwater conveyance infrastructure were reviewed in the Hydrology Report and WQMP. These studies concluded that the proposed project would not generate flow rates exceeding pre-development conditions

Page 590 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 70 ends

and would not overload off-site systems. Additionally, temporary erosion control BMPs will be implemented during construction as part of the SWPPP to avoid sedimentation and erosion impacts. Impacts would be less than significant. d) In flood hazard, tsunami, or seiche zones, risk release of pollutants due to project inundation?
Less than Significant Impact: According to FEMA Flood Maps and the City’s General Plan (Figure 15), the site lies in Zone X, indicating an area outside the 100- and 500-year flood zones. While it lies within the Puddingstone Dam Inundation Area, the dam is a regulated and monitored facility. The site is not near any large water bodies that would result in tsunami or seiche risks. Additionally, the Project includes robust drainage infrastructure and spill containment features that prevent pollutant release due to inundation. A less than significant impact would occur.
e) Conflict with or obstruct implementation of a water quality control plan or sustainable groundwater management plan?
Less than Significant Impact: The Project complies with the Los Angeles County MS4 NPDES Permit, the Sustainable Groundwater Management Act, and applicable provisions of the San Gabriel Basin Water Quality Authority. The WQMP and LID Plan include BMPs to maximize stormwater retention, infiltration, and pollution control. Additionally, the Project would maintain consistency with the adopted General Plan and Regional Water Quality Control Board objectives. Therefore, no conflicts with water quality or groundwater management plans would occur, and impacts would be less than significant.

Mitigation Measures
X. (a)
HYD-1: WQMP and Hydrology Report Compliance
Prior to grading permit issuance, the Applicant shall update the Water Quality Management Plan (WQMP) (Appendix E) and Hydrology Report (Appendix F). The Applicant shall then submit a complete and revised Low Impact Development (LID) Plan, WQMP, and Hydrology Report in compliance with the Los Angeles County MS4 NPDES Permit (Order No. R4-2021-0105, NPDES Permit No. CAS004004) to the City of Industry for review and approval.

HYD-2: SWPPP Preparation and Construction General Permit Coverage The Applicant shall prepare a Stormwater Pollution Prevention Plan (SWPPP) and obtain coverage under the Construction General Permit (CGP) from the State Water Resources Control Board prior to commencement of construction activities.

HYD-3: Industrial General Permit Compliance for Project Operations The Applicant shall obtain coverage under the Industrial General Permit (IGP) for long-term operations and comply with all monitoring and reporting requirements.

Page 591 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 71 ends

Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact
No Impact
XI. Land Use and Planning – Would the project:
a) Physically divide an established
community?
b) Cause a significant environmental impact
due to a conflict with any land use plan,
policy, or regulation adopted for the
purpose of avoiding or mitigating an
environmental effect?
Project Impacts and Mitigation Measures
Sources:
• City of Industry 2014 General Plan (adopted June 12, 2014) • City of Industry 2014 General Plan Final EIR (certified June 12, 2014) Findings of Fact: The proposed Project includes the demolition of six (6) existing industrial buildings totaling approximately 199,840 square feet and the construction of a new 140,720- square-foot industrial building on two parcels (APNs 8206-027-058 and 8206-027-080). The western parcel (APN 8206-027-058) is located within the City of Industry and designated as Employment in the City’s General Plan, with a zoning designation of Industrial (M). The eastern parcel (APN 8206-027-080), located in unincorporated County of Los Angeles (Avocado Heights), is currently designated Light Industrial (IL) and zoned Restricted Heavy Manufacturing (M-1.5) under the County’s General Plan and zoning code.

As part of the proposed Project, APN 8206-027-080 will be annexed into the City of Industry, and a General Plan Amendment and Zone Change will be processed to apply the City’s Employment land use designation and Industrial (M) zoning. Upon approval of these entitlements and annexation by the Local Agency Formation Commission (LAFCO), the Project will be fully consistent with the applicable local land use plans and zoning regulations. The proposed industrial use is compatible with the existing industrial development pattern of the area and supports the City’s economic development goals.

The proposed Project includes an annexation, a General Plan Amendment, and a Zone Change that would allow for industrial development consistent with the City of Industry’s Industrial (M) zoning district. The Project site consists of two parcels: Assessor’s Parcel Number (APN) 8206- 027-058, which is currently located within the City of Industry, and APN 8206-027-080, which is located in unincorporated County of Los Angeles, and would be annexed into the City as part of the proposed Project. This IS/MND evaluates the environmental impacts of the specific proposed Project—a new 140,720-square-foot industrial building—representing the reasonably foreseeable development enabled by these entitlements. While the Industrial (M) zone permits a range of uses with potentially greater environmental impacts (e.g., high-cube warehouses or e-commerce centers), this analysis conservatively evaluates the Project as proposed and does not

Page 592 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 72 ends

speculate on future or alternative uses. Therefore, the findings of this section reflect the maximum anticipated environmental effects associated with the proposed Project.

Therefore, the Project will not conflict with any land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect.

Discussion of Impacts
Would the project:
a) Physically divide an established community?
No Impact: The Project site is currently developed with buildings used for storage, commercial, warehousing and parts assembly purposes. No established communities exist within the Project site, nor does the Project propose or require elements or operations that would divide an off-site community. Based on the preceding, the Project would not physically divide an established community, and no impact would occur. b) Cause a significant environmental impact due to a conflict with any land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect? No Impact: The proposed Project includes a General Plan Amendment, Zone Change, and annexation to bring the site into consistency with the City’s land use planning framework.

Upon approval of these actions, the Project will be consistent with the City’s General Plan land use designation of Employment, and the Industrial (M) zoning designation. As a result, the Project would not conflict with any land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect. Therefore, no impact would occur.

Page 593 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 73 ends

Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact
No Impact
XII. Mineral Resources – Would the project:
a) Result in the loss of availability of a known
mineral resource that would be of value to
the region and the residents of the state?
b) Result in the loss of availability of a locally-important mineral resource recovery site delineated on a local general plan, specific
plan or other land use plan?
Project Impacts and Mitigation Measures
Sources:
• City of Industry 2014 General Plan (adopted June 12, 2014) • Los Angeles County General Plan Update 2035
• California Department of Conservation, California Geological Survey, Geological Map of California GIS Map.

Findings of Fact: The Project site is located on two parcels one parcel is within the City of Industry on a parcel designated Employment (APN: 8206-027-058) The second parcel, is located in Avocado Heights in the unincorporated County of Los Angeles and is zoned Light Industrial (APN:
8206-027-080) under the City of Industry and Los Angeles County General Plans, respectively.

This parcel will require annexation approval through the Local Agency Formation Commission (LAFCO) of the County of Los Angeles. The zoning designations are Industrial (M) and Restricted Heavy Manufacturing (M-1.5). A General Plan Amendment to Employment, and a ZC to Industrial (M), which would allow redevelopment with a 140,720-square-foot industrial building. While the annexation and ZC are administrative, they enable redevelopment that could potentially affect mineral resources. The site is fully developed and urbanized, and there are no known valuable mineral deposits or active mining operations on or near the Project site. Therefore, the Project would not result in the loss of availability of significant mineral resources, and impacts to mineral resources would be less than significant.

According to the California Geological Survey (CGS) and the State Mining and Geology Board, no areas within the City are designated as mineral resource zones. The site is located within the boundaries of Special Report 143 Part 4 and Special Report 202, which were developed under the Surface Mining and Reclamation Act (SMARA) of 1975. These reports provide mineral land classification (MLC) data, but based on available geologic information, the Project site is not identified as containing mineral resources of regional or statewide significance.

Page 594 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 74 ends

Discussion of Impacts
a) Result in the loss of availability of a known mineral resource that would be of value to the region and the residents of the state?
b) Result in the loss of availability of a locally-important mineral resource recovery site delineated on a local general plan, specific plan or other land use plan? a-b) No Impact: According to the City’s General Plan and the Los Angeles County General Plan, the Project site is not designated as an area of known mineral resources. According to the California Geological Survey, the Project site is considered to be an area where geologic information indicates that little likelihood exists for the presence of significant mineral resources. Additionally, there are no resource recovery sites delineated within the City boundaries, Project vicinity or surrounding areas. Therefore, the Proposed project would not result in the loss of availability of locally important mineral resources and no impact would occur.

Page 595 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 75 ends

Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact
No Impact
XIII. Noise – Would the project result in:
a) Generation of a substantial, temporary, or
permanent increase in ambient noise
levels in the vicinity of the project in excess
of standards established in the local
general plan or noise ordinance, or
applicable standards of other agencies?
b) Generation of excessive groundborne
vibration or groundborne noise levels?
c) For a project located within the vicinity of a
private airstrip or an airport land use plan
or, where such a plan has not been
adopted, within two miles of a public airport
or public use airport, would the project
expose people residing or working in the
project area to excessive noise levels?
Project Impacts and Mitigation Measures
Sources:
• City of Industry 2014 General Plan (adopted June 12, 2014) • U.S. Department of Transportation. Federal Highway Administration. Construction Noise Handbook. Chapter 9.0 “Construction Equipment Noise Levels and Ranges.” • A-NET. L.A. County’s Airport Land Use Commission Site. County of Los Angeles. A-NET (arcgis.com)
• Noise Impact Study for Industrial Park Redevelopment in the City of Industry. Yorke Engineering LLC. April 2025. (Appendix G)
Findings of Fact: The City of Industry is characterized by a predominantly industrial land use pattern and is located near major transportation corridors, including State Highways 60 and 57, and the Interstate 605 Freeway. As a result, the City is subject to ongoing ambient noise from industrial activities and regional vehicular traffic. The proposed Project site, located at the northwest corner of Valley Boulevard and S. 6th Avenue, is situated within this existing industrial context.

The proposed Project includes an annexation, a General Plan Amendment, and a Zone Change that would allow for industrial development consistent with the City of Industry’s Industrial (M) zoning district. The Project site consists of two parcels: Assessor’s Parcel Number (APN) 8206- 027-058, which is currently located within the City of Industry, and APN 8206-027-080, which is located in unincorporated County of Los Angeles, and would be annexed into the City as part of the proposed Project. This IS/MND evaluates the environmental impacts of the specific proposed

Page 596 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 76 ends

Project—a new 140,720-square-foot industrial building—representing the reasonably foreseeable development enabled by these entitlements. While the Industrial (M) zone permits a range of uses with potentially greater environmental impacts (e.g., high-cube warehouses or e-commerce centers), this analysis conservatively evaluates the Project as proposed and does not speculate on future or alternative uses. Therefore, the findings of this section reflect the maximum anticipated environmental effects associated with the proposed Project.

A Noise Impact Study was prepared by Yorke Engineering, LLC in April 2025 (Appendix G).

According to the Noise Impact Study, the nearest sensitive receptor is a single-family residence approximately 750 feet southwest of the Project site. Additional sensitive residential uses are located in the City of La Puente, approximately 1,200 feet to the northeast. All other adjacent uses are industrial in nature. The Project involves the demolition of six (6) existing industrial buildings and construction of a new 140,720-square-foot industrial building. During construction, temporary noise levels may exceed 80 dBA near equipment, which is typical of heavy construction activity, and may also result in perceptible—but temporary—groundborne vibration. However, these impacts would be short-term and attenuate with distance.

The City’s General Plan identifies acceptable noise levels for industrial uses up to 75 CNEL (dBA), with conditional acceptability between 70–80 CNEL. Given the distance of sensitive receptors and the surrounding industrial land uses, the Project is not expected to expose people to noise levels that would exceed applicable standards. Therefore, noise impacts from both construction and long-term operational activities are anticipated to be less than significant with standard construction practices and adherence to local noise regulations.

Discussion of Impacts
Would the project result in:
a) Generation of a substantial, temporary, or permanent increase in ambient noise levels in the vicinity of the project in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies?
Less than Significant Impact: A project would normally have a significant effect on the environment related to noise if it would substantially increase the ambient noise levels for adjoining areas or conflict with adopted environmental plans and goals of the community in which it is located. The applicable noise standards governing the Project site are the land use compatibility criteria in the City’s General Plan Safety Element and the numerical construction thresholds in the Federal Transit Administration (FTA) Transit Noise and Vibration Impact Assessment as the City of Industry does not have specific noise thresholds in its Municipal Code. .

Construction Related Impacts
The City does not have a specific Municipal Code requirement that restricts general daytime construction hours. However, construction activities must comply with the Los Angeles County Noise Ordinance, which applies within the City. Temporary construction noise would be limited to the County’s allowable daytime hours, between 7:00 a.m. and 8:00 p.m. on weekdays and Saturdays, and would permanently cease upon completion of construction. Most construction noise would occur during the demolition, site preparation, grading, building construction,

Page 597 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 77 ends

trenching, and paving phases when heavy equipment would be operating. During each of the construction phases there would be a different mix of equipment operating, and cumulative noise levels would vary based on the amount of equipment in operation and the location of each activity at the project site. In general, use of off-road equipment and portable equipment would generate noise due to engine mechanicals, engine exhaust, driveline mechanicals, shaft-driven devices and accessories, hydraulics operation, ground friction and displacement, and gravity drops (dumping, unloading). The Project is expected to require up to approximately one year of planned work activities (i.e., from mobilization to substantial completion) comprising six construction phases:

1. Demolition

2. Site preparation

3. Grading

4. Building construction

5. Paving

6. Architectural Coating
Table 13-1 shows a comparison of estimated daytime exterior noise impacts for peak Project construction activities at the nearest sensitive receptors located 750 feet southwest of the site.

As shown in Table 13-1, the aggregated average construction noise would be below the 80 dBA FTA noise level threshold at nearby noise sensitive receptors. Therefore, temporary impacts on ambient noise levels in excess of applicable standards during construction would be less than significant.

Table 13-1 Estimated Construction Noise Impacts at the Nearest Sensitive Receptor Construction
Phase
Modeled Noise
Level
(Leq dBA)
Significance
Threshold
(Leq dBA)
Exceeds
Threshold?
Demolition 64 80 No
Site Preparation 61 80 No
Grading 63 80 No
Building
Construction 60 80 No
Paving 62 80 No
Architectural
Coating 56 80 No
Operation Related Impacts
Project-related noise produced during the operations phase would occur from on-site sources as well as off-site from project related vehicle traffic. On-site noise sources attributable to the Project would affect land uses proximate to the project site whereas project traffic would affect roadways taken to the Project site.

On-Site Project Noise Sources

Page 598 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 78 ends

Operational noise sources associated with the proposed Project would include, but are not limited to, mechanical equipment (e.g., forklifts, HVAC units), truck loading activities, landscape maintenance equipment, and parking lot activities. All these uses would be subject to noise nuisance regulations discussed in the Noise Impact Study under Chapter 1.30 (Appendix G). Compliance with these noise regulations are required for the Project and surrounding industrial uses.

Forklifts noise levels at 50 feet can vary but typically range from 80 to 100 dBA, depending on type and size. Landscaping equipment can produce noise levels of 65 to 80 dBA at 50 feet.

Delivery trucks at loading docks would generate noise levels of approximately 71 dBA and parking lot noise levels typically are about 40 dBA at 50 feet. Operational HVAC noise levels are based on manufacturer sound pressure levels, which range from 25-57 dBA Leq measured at a distance of 50 feet from the source (Appendix G). The seven roof-mounted HVAC units would result in noise levels of 10-42 dBA Leq at the nearest sensitive receptor, which is located approximately 750 feet from the above-mentioned sources. Intervening structures would attenuate the noise levels by 5-20 dB. To be conservative, it was assumed that seven trucks, two forklifts, and one piece of landscaping equipment would be operated onsite at any one time. The combined noise levels from the proposed Project at the nearest sensitive receptor would be approximately 55 dBA, which is below the FTA’s noise limit of 60 dBA Leq. As such, noise impacts from on-site stationary sources would be less than significant and no mitigation is required.

Off-Site Traffic Noise
Project-related off-site noise sources (i.e., roadway traffic noise) have the potential to increase noise levels on local roadways proximate to the Project site. The determination of whether traffic related noise impacts would occur is based on whether project-related off-site noise sources (i.e., roadway traffic noise) cause the ambient noise levels proximate to the local roadways to result in an audible increase (3 dBA). Based on the trip generated calculated for the Project, operation of the proposed Project would decrease traffic volume as compared to existing uses. The existing uses generate 322 vehicle trips per day while the proposed Project is estimated to generate a total of 240 vehicle trips per day, The net difference between vehicle trips generated between existing and Project uses is a decrease of 82 trips per day. However, the number of trucks associated with the Project is expected to increase above the existing uses.

To determine the change in noise levels associated with the increase in truck use related to the Project, the FHWA’s TNM was used to compare overall vehicle noise between the existing and proposed Project uses. Despite the Project generating less average daily trips, the Project would result in 1 dBA CNEL increase in noise levels as compared to vehicle trips occurring under the existing uses due to the Project’s increase in truck trips. Increase in noise of less than 1 dBA is not discernable to human hearing, even under laboratory conditions. A measurement of 3 dBA is considered to be the minimum change that is needed for humans to detect a change in noise levels in outdoor environments. A 3 dBA increase occurs when traffic volumes double or a project increases the percentage of noisy trucks on roadways. As such, the proposed Project would not result in a substantial permanent change in noise levels and would result in less than significant noise impacts related to traffic noise.

Page 599 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 79 ends

b) Generation of excessive groundborne vibration or groundborne noise levels? Less than Significant Impact: Potential vibration generated from the Project would primarily occur from the construction phase when heavy construction equipment is used for demolition and construction activities. During construction activities, the Project would generate minor levels of vibration due to operation of off-road equipment, portable equipment, and vehicles at or near the Project site. Vibration levels for the Project related construction activities assumes that equipment would operate at the closest point on the property to the nearest off-site buildings in each cardinal direction. Because these off-site facilities are industrial buildings, it is assumed that they are engineered concrete and masonry structures with a construction vibration damage criteria of 0.3 PPV. The nearest offsite structures would be exposed to a PPV well below 0.3 in/sec, which is the threshold at which physical damage to engineered buildings may occur. Workers at the nearby industrial uses are not considered to be vibration sensitive so annoyance was assessed at the nearest vibration sensitive residential use. Similarly, the nearest vibration receptor would be exposed to vibration levels well below 0.2 in/sec, which is the annoyance threshold (Appendix G). Therefore, impacts associated with off-site Project-generated traffic noise would be less than significant. c) For a project located within the vicinity of a private airstrip or an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project expose people residing or working in the project area to excessive noise levels?
No Impact: No private airstrips exist within two miles of the Project vicinity. The nearest airport is San Gabriel Valley Airport, located approximately 4.6 miles to the-northwest of the Project site. The closest heliport is the LA County Sheriff’s Department Heliport located approximately

1.3 miles south of the Project site within the City’s boundaries. The Project site is not located within 2 miles of any public airport, nor is it located within the boundaries of any airport land use plans. Therefore, the proposed Project would not expose or result in excessive noise for people residing or working in the Project area, and no impact would occur.

Page 600 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 80 ends

Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact
No Impact
XIV. Population and Housing – Would the project:
a) Induce substantial unplanned population
growth in an area, either directly (for
example, by proposing new homes and
businesses) or indirectly (for example,
through extension of roads or other
infrastructure)?
b) Displace substantial numbers of existing
people or housing, necessitating the
construction of replacement housing
elsewhere?
Project Impacts and Mitigation Measures
Sources:
• City of Industry 2014 General Plan (adopted June 12, 2014) • City of Industry 2014 General Plan Final EIR (certified June 12, 2014) Findings of Fact: The Project site is currently developed with six (6) existing buildings used for storage, commercial, warehousing and parts assembly purposes, totaling approximately 199,840 square feet. The Project proposes to replace the existing buildings with one (1) industrial building totaling 140,720 square feet to accommodate one (1) tenant for manufacturing, warehousing/distribution uses. The Project site does not include any housing.

The proposed Project includes an annexation, a General Plan Amendment, and a Zone Change that would allow for industrial development consistent with the City of Industry’s Industrial (M) zoning designation. The Project site consists of two parcels: Assessor’s Parcel Number (APN) 8206-027-058, which is currently located within the City of Industry, and APN 8206-027-080, which is located in unincorporated Los Angeles County and would be annexed into the City as part of the proposed Project. This IS/MND evaluates the environmental impacts of the specific proposed Project—a new 140,720-square-foot industrial building—representing the reasonably foreseeable development enabled by these entitlements. While the Industrial (M) zone permits a range of uses with potentially greater environmental impacts (e.g., high-cube warehouses or e-commerce centers), this analysis conservatively evaluates the Project as proposed and does not speculate on future or alternative uses. Therefore, the findings of this section reflect the maximum anticipated environmental effects associated with the proposed Project.

Discussion of Impacts
Would the project:
a) Induce substantial unplanned population growth in an area, either directly (for example, by proposing new homes and businesses) or indirectly (for example, through extension of roads or other infrastructure)?

Page 601 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 81 ends

No Impact: The most immediate presence of potential growth related to the proposed Project would be the labor force associated with the construction and operation of the industrial facility. Section 1.5.1 of the City’s General Plan indicates that 70% of people working in the City live in the nearby communities of the East San Gabriel Valley, South San Gabriel Valley, Upper San Gabriel Valley, and Whittier. Since the Project site is in an urban and built-up area, the labor force associated with the construction and operation of the proposed Project would likely be comprised of persons from the surrounding and existing workforce within the area. The Project does not propose any residential dwelling units and would not result in direct or indirect population growth. Therefore, the proposed Project will have no impact regarding unplanned population growth.
b) Displace substantial numbers of existing people or housing, necessitating the construction of replacement housing elsewhere?
No Impact: The Project would replace an existing industrial facility used for manufacturing purposes. The Project would not require the removal of existing housing or people.

Therefore, the proposed Project will have no impact on displacing existing housing or people.

Page 602 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 82 ends

Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact
No Impact
XV. Public Services – Would the project:

Result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for any of the public services:
i) Fire protection?
ii) Police protection?
iii) Schools?
iv) Parks?
v) Other public facilities?
Project Impacts and Mitigation Measures
Sources:
• City of Industry 2014 General Plan (adopted June 12, 2014) • City of Industry 2014 General Plan Final EIR (certified June 12, 2014) Findings of Fact: The City of Industry is served by Los Angeles County Fire Department Battalion 12, with three (3) fire stations located within the City—Stations 43 (Stimson Ave), 87 (2nd Ave), and 118 (Gale Ave)—and additional coverage provided through mutual aid. The nearest station to the Project site is Station 87, approximately 1 mile northwest. Law enforcement services are provided by the Los Angeles County Sheriff’s Department, with the Industry Sheriff’s Station located about 1.3 miles southeast, at 150 N. Hudson Ave.

The Project site is within the Hacienda La Puente Unified School District. Nearby schools include Nelson Elementary (0.6 miles east), Don Julian Elementary (0.6 miles west), Sparks Elementary (0.82 miles northeast), and Wedgeworth Elementary (1 mile east).

The Project involves demolishing approximately 199,840 square feet of industrial buildings and constructing a new 140,720-square-foot industrial building, representing a net reduction in building area and no associated population growth.

The proposed Project includes an annexation, a General Plan Amendment, and a Zone Change that would allow for industrial development consistent with the City of Industry’s Industrial (M) zoning designation. The Project site consists of two parcels: Assessor’s Parcel Number (APN) 8206-027-058, which is currently located within the City of Industry, and APN 8206-027-080, which is located in unincorporated Los Angeles County and would be annexed into the City as part of the proposed Project. This IS/MND evaluates the environmental impacts of the specific proposed Project—a new 140,720-square-foot industrial building—representing the reasonably foreseeable development enabled by these entitlements. While the Industrial (M) zone permits a

Page 603 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 83 ends

range of uses with potentially greater environmental impacts (e.g., high-cube warehouses or e-commerce centers), this analysis conservatively evaluates the Project as proposed and does not speculate on future or alternative uses. Therefore, the findings of this section reflect the maximum anticipated environmental effects associated with the proposed Project.

Discussion of Impacts
Would the project:
a) Result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for any of the public services:
i) Fire protection?
Less than Significant Impact: The Los Angeles County Fire Department will continue to provide fire protection and emergency medical services to the Project site and surrounding area. The Project involves demolishing approximately 199,840 square feet of existing buildings and constructing a new 140,720-square-foot industrial building— resulting in a net reduction of building area. Furthermore, as the Project does not involve population growth and will comply with current fire code standards, including fire suppression and emergency access, it is not expected to increase demand for fire services. The Project will also undergo review by the Fire Department, and no new or expanded fire facilities are anticipated. Therefore, impacts would be less than significant.
ii) Police protection?
Less than Significant Impact: The Los Angeles County Sheriff’s Department will continue to provide police protection services to the Project site and surrounding area.

The nearest station is located approximately 1.3 miles southeast of the site. The Project involves replacing six (6) existing industrial buildings totaling 199,840 square feet with one new 140,720-square-foot industrial building, resulting in a net decrease in building area. As no population growth is anticipated and the Project will not increase demand for law enforcement services, construction of new or expanded police facilities is not required. Therefore, impacts would be less than significant iii) Schools?
No Impact: The proposed Project involves industrial development and would not generate school-aged children or increase local population. As a result, it would not create a direct or indirect demand for public school services or facilities. Therefore, the Project would not result in the need for new or expanded public school facilities, and no impact would occur.
iv) Parks?
No Impact: The Project proposes industrial development and would not introduce new

Page 604 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 84 ends

housing or residents to the area. Therefore, it would not increase demand for neighborhood or regional parks or other recreational facilities. The Project would not contribute to the need for new or expanded park facilities, and no impact would occur. v) Other facilities?
No Impact: Demand for public facilities is generated by the population within a facility’s service area. The Project would not induce population growth and therefore would not create a demand for public facilities/services, including libraries, community recreation centers, post offices, and animal shelters. As such, implementation of the proposed Project would not adversely affect or require the construction of new or modified public facilities. No impact would occur.

Page 605 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 85 ends

Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact
No Impact
XVI. Recreation
a) Would the project increase the use of
existing neighborhood and regional parks
or other recreational facilities such that
substantial physical deterioration of the
facility would occur or be accelerated?
b) Does the project include recreational
facilities or require the construction or
expansion of recreational facilities which
might have an adverse physical effect on
the environment?
Project Impacts and Mitigation Measures
Sources:
• City of Industry 2014 General Plan (adopted June 12, 2014) • California Government Code § 66477
Findings of Fact: The Project involves the annexation of one parcel (APN: 8206-027-080) located in Avocado Heights in unincorporated County of Los Angeles into the City of Industry, a General Plan Amendment to Employment, and a ZC to Industrial (M), enabling redevelopment with a 140,720-square-foot industrial building. Although the annexation and ZC are administrative, they facilitate development that could affect recreational resources.

The site is currently developed and located in an industrial area with no public parks, trails, or recreational facilities on-site or immediately adjacent. The Project does not include or remove recreational facilities and would not increase demand on existing recreational resources beyond typical industrial development. Therefore, impacts on recreation would be less than significant. The proposed Project may generate additional employment opportunities; however, this is not expected to result in a demand for new or expanded recreational facilities. As noted in the City’s General Plan, the City of Industry is a business-oriented community with a minimal residential population.

Furthermore, industrial developments such as the proposed Project are not subject to the Quimby Act (California Government Code § 66477), which applies only to residential subdivisions.

Therefore, the Project would not result in significant impacts related to recreation.

Discussion of Impacts
a) Would the project increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated?
b) Does the project include recreational facilities or require the construction or expansion of recreational facilities which might have an adverse physical effect on the environment? a-b) No Impact: The Applicant proposes to re-develop the Project site with one (1) industrial

Page 606 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 86 ends

building. The Project does not include any type of residential use or other land use that may generate a population that would increase the utilization of existing neighborhood and regional parks or other recreational facilities. Accordingly, implementation of the proposed Project would not result in substantial physical deterioration of an existing neighborhood or regional park. The Project does not include any new on- or off-site recreation facilities, nor the expansion of any existing off-site recreational facilities. Thus, environmental effects related to the use, construction, or expansion of recreational facilities would not occur with implementation of the proposed Project. No impact on recreational facilities would occur.

Page 607 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 87 ends

Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact
No Impact
XVII. Transportation/Traffic– Would the project:
a) Conflict with a program, plan, ordinance or
policy addressing the circulation system,
including transit, roadway, bicycle, and
pedestrian facilities?
b) Conflict or be inconsistent with CEQA
Guidelines section 15064.3, subdivision
(b)?
c) Substantially increase hazards due to a
geometric design feature (e.g., sharp
curves or dangerous intersections) or
incompatible uses (e.g., farm equipment)?
d) Result in inadequate emergency access?
Project Impacts and Mitigation Measures
Sources:
• City of Industry 2014 General Plan (adopted June 12, 2014) • Resolution No CC 2020-20 (...) Adopting Vehicle Miles Traveled Thresholds of Significance for Purposes of Analyzing Transportation Impacts under CEQA City of Industry. Adopted June 25, 2020.
• VMT Analysis Memorandum – 184 S. Sixth Avenue. CNC Engineering. January 31, 2025 (Appendix H)
Findings of Fact: The proposed Project involves demolition of six (6) existing industrial buildings totaling 199,840 square feet, and the construction of a single new industrial building totaling 140,720 square feet. Access will be provided via driveways on E. Valley Boulevard and S. 6th Avenue, both of which are designated arterial routes.

The proposed Project includes an annexation, a General Plan Amendment, and a Zone Change that would allow for industrial development consistent with the City of Industry’s Industrial (M) zoning designation. The Project site consists of two parcels: Assessor’s Parcel Number (APN) 8206-027-058, which is currently located within the City of Industry, and APN 8206-027-080, which is located in unincorporated County of Los Angeles, and would be annexed into the City as part of the proposed Project. This IS/MND evaluates the environmental impacts of the specific proposed Project—a new 140,720-square-foot industrial building—representing the reasonably foreseeable development enabled by these entitlements. While the Industrial (M) zone permits a range of uses with potentially greater environmental impacts (e.g., high-cube warehouses or e-commerce centers), this analysis conservatively evaluates the Project as proposed and does not speculate on future or alternative uses. Therefore, the findings of this section reflect the maximum anticipated environmental effects associated with the proposed Project.

Page 608 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 88 ends

Pursuant to Senate Bill (SB) 743 and CEQA Guidelines Section 15064.3, the City of Industry evaluates transportation impacts based on Vehicle Miles Traveled (VMT) rather than Level of Service (LOS). The City has adopted local VMT thresholds and screening criteria for determining when a project may be presumed to have a less-than-significant transportation impact. According to the VMT Analysis prepared by CNC Engineering (January 2025, Appendix H), the Project qualifies for screening under the City’s Low VMT Area criterion, which identifies employment-based projects with VMT per worker comparable to existing low VMT areas. Based on this screening determination, the Project is not anticipated to result in significant transportation impacts related to VMT, and no mitigation is required.

Discussion of Impacts
Would the project:
a) Conflict with a program, plan, ordinance or policy addressing the circulation system, including transit, roadway, bicycle, and pedestrian facilities?
Less than Significant Impact: Access to the proposed Project would be provided through a 40-foot-wide driveway on E. Valley Boulevard and a 28-foot-wide driveway on S. 6th Avenue. A 28-foot-wide drive aisle is planned to loop around the building, allowing for internal site circulation and functioning as a designated fire access lane. As designed, the Project will accommodate both truck and passenger vehicle ingress and egress.

Construction Related Impacts
Demolition and construction phases of the Project are expected to take approximately 10 months. The Project is not expected to have significant impacts to the circulation system around the Project site. Construction of the Project would generate additional temporary traffic on the existing area roadway network. These new vehicle trips would include construction workers traveling to the site as well as delivery trips associated with construction equipment and materials. Delivery of construction materials to the site would likely require oversize vehicles that may travel at slower speeds than existing traffic and, due to their size, may intrude into adjacent travel lanes. Additionally, the total number of vehicle trips associated with all construction-related traffic (including construction workers) would temporarily increase VMT traffic volumes traveling on local roadways and intersections.

Once materials are delivered to the site, all construction activities and staging of construction vehicles would occur on-site within the existing boundaries. Lane closures are not anticipated, and no off-site roadway improvements are required or proposed that would have the potential to interrupt area circulation or redirect traffic. As such, Project construction is not anticipated to substantially disrupt area traffic or cause a significant increase in daily traffic on area roadways or at local intersections, thereby adversely affecting existing conditions. Per standard construction procedures, the construction contractor would prepare and implement a traffic control plan to ensure that public safety and emergency access are maintained during the construction phase. Implementation of the traffic control plan would ensure that existing conditions are not adversely affected or substantially degraded by Project construction. Therefore, construction effects would have a less than significant impact.

Page 609 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 89 ends

Operation Related Impacts
Senate Bill (SB) 743 Consistency
The VMT Analysis for the Project was prepared by CNC Engineering using the SGVCOG online VMT evaluation tool. The City has adopted VMT thresholds and VMT screening thresholds. One of the criteria for a project to be screened out from further VMT analysis is if the project is in a Low VMT Area. CNC Engineering utilized the San Gabriel Valley Council of Governments (SGVCOG) online evaluation tool for the proposed Project. The analysis concluded that the Project is located in a Low VMT Area, and therefore, the Project is screened out and no further VMT analysis is required. Therefore, the Project would have a less than significant impact and would not have significant conflict with a program, plan, ordinance, or policy addressing the circulation system, including transit, roadway, bicycle and pedestrian facilities.

Parking Requirements
Section 17.36.060.K of the City’s Municipal Code provides that “[t]he number of parking spaces which shall be provided is based upon the square footage of the building which they are intended to serve and the use to which that building is to be put.” The number of parking spaces provided for the Project shall be as follows:

Table 17-1 Parking Compliance
Building Floor
Area
(square feet)
Parking Stalls
Required Parking Stalls
Building
0-25,000 1 space per 500 sq. ft. of floor
area
50 25,000-100,000
50 spaces plus 1 space per 750
sq. ft. of floor area over 25,000 sq.
ft.
100
Over 100,000 150 spaces per 1,000 sq. ft. of
floor area over 100,000 sq. ft. 41
Total Spaces Required 191
TOTAL SPACES PROVIDED 199
As illustrated above, the total building area of 140,720 square feet would require 191 parking stalls for the proposed industrial building. The Project includes 146 standard parking stalls and 53 electrical vehicle (EV) stalls for a total of 199 parking stalls. Additionally, the Project includes 14 dock-high doors for truck docking on the south-eastern side of the building. Six (6) bike racks are proposed at the front of the building. Thus, the proposed parking for the industrial building complies with the City’s Municipal Code and operational related impacts would be less that significant.

Page 610 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 90 ends

b) Would the project conflict or be inconsistent with CEQA Guidelines section 15064.3, subdivision (b)?
No Impact: CEQA Guidelines Section 15064.3 subdivision (b) addresses Vehicle Miles Traveled (VMT) and whether the land use project will generate vehicle miles traveled in excess of an applicable threshold of significance. On June 25, 2020, the City adopted a resolution approving the VMT thresholds of significance for purposes of analyzing transportation impacts under CEQA (City of Industry, 2020). As described above in section “a,” the Project parcels are located in a Low VMT Area and would therefore be screened out of preparing a full VMT analysis as per the resolution. The Project would not conflict or be inconsistent with CEQA Guidelines § 15064.3, subdivision (b). No impact would occur. c) Substantially increase hazards due to a geometric design feature (e.g., sharp curves or dangerous intersections) or incompatible uses (e.g., farm equipment)? No Impact: The streets and intersections are designed to accommodate the anticipated levels of vehicular and pedestrian activity and have historically been accommodating activities at the Project site. The Project circulation pattern is subject to City review and approval and thus, will conform with local, state, and federal regulations regarding circulation and traffic pattern design. The Project would not substantially increase hazards due to a geometric design feature (e.g., sharp curves or dangerous intersections) or incompatible uses. No impact would occur.
d) Result in inadequate emergency access?
Less than Significant Impact: The proposed Project will provide vehicular access via a 40- foot-wide driveway on E. Valley Boulevard and a 26-foot-wide driveway on S. 6th Avenue. A 28-foot-wide drive aisle will loop around the building, providing on-site circulation and dedicated fire access. These access features will be designed in compliance with applicable City standards and subject to review and approval by the City. Coordination with the Los Angeles County Fire Department will ensure that appropriate fire protection and emergency response requirements are incorporated into the Project design. Therefore, the Project would not result in inadequate emergency access, and impacts would be less than significant.

Page 611 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 91 ends

Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact
No Impact
XVIII. Tribal Cultural Resources – Would the project cause a substantial adverse change in the significance of a tribal cultural resource, defined in Public Resources Code section 21074 as either a site, feature, place, cultural landscape that is geographically defined in terms of the size and scope of the landscape, sacred place, or object with cultural value to a California Native American tribe, and that is:
a) Listed or eligible for listing in the California
Register of Historical Resources, or in a
local register of historical resources as
defined in Public Resources Code section
5020.1(k), or
b) A resource determined by the lead agency,
in its discretion and supported by
substantial evidence, to be significant
pursuant to criteria set forth in subdivision
(c) of Public Resources Code section
5024.1. In applying the criteria set forth in
subdivision (c) of Public Resource Code
Section 5024.1, the lead agency shall
consider the significance of the resource to
a California Native American tribe.

Project Impacts and Mitigation Measures
Sources:
• City of Industry 2014 General Plan (adopted June 12, 2014) • Los Angeles County GIS-NET
Findings of Fact: As of July 1, 2015, Public Resources Code Sections 21080.1, 21080.3.1, and 21080.3.2 require public agencies to consult with California Native American tribes recognized by the Native American Heritage Commission (NAHC) for the purpose of mitigating impacts to tribal cultural resources. This law does not preclude agencies from initiating consultation with the tribes that are culturally and traditionally affiliated with their jurisdictions.

In accordance with Public Resources Code Section 21080.3.1(d), a lead agency is required to provide formal notification of intended development projects to Native American tribes that have requested to be on the lead agency’s list for receiving such notification. The formal notification is required to include a brief description of the proposed Project and its location, lead agency contact information, and a notification that the California Native American tribe has 30 days to request consultation for tribal cultural resources. On March 13, 2025, the City transmitted letters of notification to the following tribes traditionally and/or culturally affiliated with the Project area or have specifically requested notice for all projects within the City: Soboba Band of Luiseño Indians, Gabrielino Tongva Tribe and the Gabrieleño Band of Mission Indians – Kizh Nation. The City

Page 612 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 92 ends

received one (1) request for consultation from the Gabrieleño Band of Mission Indians – Kizh Nation. Consultation was conducted on March 14, 2025, and the Gabrieleño Band of Mission Indians – Kizh Nation provided mitigation measures which are incorporated below.

The Project involves the annexation of one parcel (APN: 8206-027-080) located in Avocado Heights in unincorporated County of Los Angeles into the City of Industry, a General Plan Amendment to Employment, and a ZC to Industrial (M), which would allow redevelopment with a 140,720-square-foot industrial building. While the annexation and ZC are administrative, they enable construction that could potentially affect tribal cultural resources. The site is already developed and heavily disturbed, and no known tribal cultural resources have been identified on-site. Although the likelihood of encountering intact tribal resources is low, standard inadvertent-discovery procedures including halting work, evaluation by a qualified archaeologist, and consultation with local tribal representatives would be implemented if any resources are found.

With the mitigation measures as stated below, impacts to tribal cultural resources would be less than significant.

Discussion of Impacts
a) Listed or eligible for listing in the California Register of Historical Resources, or in a local register of historical resources as defined in Public Resources Code section 5020.1(k), or Less than Significant Impact: The Project site is a fully developed Property and does not contain any known tribal cultural resources. According to the City’s General Plan Resource Management Element, and the Office of Historic Preservation’s Inventory for Los Angeles County, the site is not located within an area containing historic resources. As such, the site does not meet the criteria for listing in the California Register of Historical Resources or in a local register, as defined in Public Resources Code section 5020.1(k).

In accordance with AB 52, formal notification of the Project was provided to the Gabrieleño Band of Mission Indians – Kizh Nation on March 13, 2025. The Tribe responded and requested consultation, providing historical context that indicated the general vicinity of the Project site may have been near traditional trade routes. However, no site-specific Tribal Cultural Resources (TCRs), as defined by Public Resources Code § 21074, were identified on the Project site.

Because the Project site is fully developed, lacks any features associated with cultural or historical significance, and no eligible TCRs have been recorded or identified, the Project would not result in a substantial adverse change in the significance of a tribal cultural resource. Therefore, potential impacts would be less than significant. b) A resource determined by the lead agency, in its discretion and supported by substantial evidence, to be significant pursuant to criteria set forth in subdivision (c) of Public Resources Code section 5024.1. In applying the criteria set forth in subdivision (c) of Public Resource Code Section 5024.1, the lead agency shall consider the significance of the resource to a California Native American tribe.

Less than Significant Impact with Mitigation Incorporated: The Project site does not contain any known TCRs that have been determined by the lead agency, in its discretion and

Page 613 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 93 ends

supported by substantial evidence, to be significant pursuant to the criteria set forth in Public Resources Code section 5024.1(c). These criteria include whether the resource:

1. Is associated with events that have made a significant contribution to the broad patterns of California’s history or cultural heritage;

2. Is associated with the lives of persons important in the past;

3. Embodies the distinctive characteristics of a type, period, region, or method of construction, or represents the work of a master, or possesses high artistic values; or

4. Has yielded, or may be likely to yield, information important in prehistory or history.

In applying these criteria, the lead agency has also considered the significance of the resource to the Gabrieleño Band of Mission Indians – Kizh Nation, consistent with tribal consultation requirements.

The site is fully developed with commercial, and warehouse uses and is not listed in the California Register of Historical Resources (CRHR), a local register, or in the City of Industry’s Resource Management Element of the General Plan as a historic or cultural resource.

Furthermore, previous disturbance reduces the likelihood of intact TCRs onsite.

Although the site has been previously disturbed and it is not anticipated that TCRs exist onsite, the potential for inadvertent discovery remains. To address this possibility, Mitigation Measures TCR-1, TCR-2, and TCR-3 will be implemented. These measures require a qualified Native American Monitor to be present during ground-disturbing activities, immediate cessation of work within at least 50 feet of any discovered resource, and appropriate assessment and treatment of the find by the monitor and archaeologist. If human remains are encountered, construction will halt in accordance with Health and Safety Code Section 7050.5, and the County Coroner will be notified. With implementation of these mitigation measures, the Project’s potential impacts to tribal cultural resources would be less than significant.

Mitigation Measures
XVIII. (b)
TCR-1: Retain a Native American Monitor Prior to Commencement of Ground Disturbing Activities
A) The Project applicant/lead agency shall retain a Native American Monitor from or approved by the Gabrieleño Band of Mission Indians – Kizh Nation. The monitor shall be retained prior to the commencement of any “ground-disturbing activity” for the subject Project at all Project locations (i.e., both on-site and any off-site locations that are included in the Project description/definition and/or required in connection with the Project, such as public improvement work). “Ground-disturbing activity” shall include, but is not limited to, demolition, pavement removal, potholing, auguring, grubbing, tree removal, boring, grading, excavation, drilling, and trenching.

B) A copy of the executed monitoring agreement shall be submitted to the lead agency prior to the earlier of the commencement of any ground-disturbing activity, or the issuance of any permit necessary to commence a ground-disturbing activity.

Page 614 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 94 ends

C) The monitor will complete daily monitoring logs that will provide descriptions of the relevant ground-disturbing activities, the type of construction activities performed, locations of ground disturbing activities, soil types, cultural-related materials, and any other facts, conditions, materials, or discoveries of significance to the Tribe. Monitor logs will identify and describe any discovered TCRs, including but not limited to, Native American cultural and historical artifacts, remains, places of significance, etc., (collectively, tribal cultural resources, or “TCR”), as well as any discovered Native American (ancestral) human remains and burial goods. Copies of monitor logs will be provided to the Project applicant/lead agency upon written request to the Tribe.

D) On-site tribal monitoring shall conclude upon the latter of the following (1) written confirmation to the Kizh from a designated point of contact for the Project applicant/lead agency that all ground-disturbing activities and phases that may involve ground-disturbing activities on the Project site or in connection with the Project are complete; or (2) a determination and written notification by the Kizh to the Project applicant/lead agency that no future, planned construction activity and/or development/construction phase at the Project site possesses the potential to impact Kizh TCRs.

TCR-2: Unanticipated Discovery of Tribal Cultural Resources Objects (Non-Funerary/Non-Ceremonial) A) Upon discovery of any TCRs, all construction activities in the immediate vicinity of the discovery shall cease (i.e., not less than the surrounding 50 feet) and shall not resume until the discovered TCR has been fully assessed by the Kizh monitor and/or Kizh archaeologist. The Kizh will recover and retain all discovered TCRs in the form and/or manner the Tribe deems appropriate, in the Tribe’s sole discretion, and for any purpose the Tribe deems appropriate, including for educational, cultural and/or historic purposes.

TCR-3: Unanticipated Discovery of Human Remains and Associated Funerary or Ceremonial Objects
A) Native American human remains are defined in PRC 5097.98(d)(1) as an inhumation or cremation, and in any state of decomposition or skeletal completeness. Funerary objects, called associated grave goods in Public Resources Code Section 5097.98, are also to be treated according to this statute.

B) If Native American human remains and/or grave goods are discovered or recognized on the Project site, then Public Resource Code 5097.9 as well as Health and Safety Code Section 7050.5 shall be followed.

C) Human remains and grave/burial goods shall be treated alike per California Public Resources Code section 5097.98(d)(1) and (2).

D) Preservation in place (i.e., avoidance) is the preferred manner of treatment for discovered human remains and/or burial goods.

E) Any discovery of human remains/burial goods shall be kept confidential to prevent further disturbance.

Page 615 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 95 ends

Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact
No Impact
XIX. Utilities and Service Systems – Would the project:
a) Require or result in the relocation or
construction of new or expanded water or
wastewater treatment or storm water
drainage, electric power, natural gas, or
telecommunications facilities, the
construction or relocation of which could
cause significant environmental effects?
b) Have sufficient water supplies available to
serve the project and reasonably
foreseeable future development during
normal, dry, and multiple dry years?
c) Result in a determination by the
wastewater treatment provider which
serves or may serve the project that it has
adequate capacity to serve the project’s
projected demand in addition to the
provider’s existing commitments?
d) Generate solid waste in excess of State or
local standards, or in excess of the
capacity of local infrastructure, or
otherwise impair the attainment of solid
waste reduction goals?
e) Comply with federal, state, and local
management and reduction statutes and
regulations related to solid waste?
Sources:
• City of Industry 2014 General Plan (adopted June 12, 2014) • City of Industry 2014 General Plan Final EIR (certified June 12, 2014) • Industry Municipal Code, Section 8.20.060
• Los Angeles County Sanitation Districts (LACSD), Wastewater (Sewage) Facilities, San Jose Creek Water Reclamation Plant
• San Gabriel Valley Water Company, 2020 Urban Water Management Plan Suburban Water Systems (UWMP). June 2021.
• 2022 California Gas Report. California Gas and Electric Utilities. 2022 • 2023 California Gas Report Supplement. California Gas and Electric Utilities, 2023 • Estimated Solid Waste Generation Rates. California Department of Resources Recycling and Recovery (CalRecycle). 2019a.
• Will Serve Documents (Appendix I).

Page 616 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 96 ends

• Frequently Asked Questions. California Department of Resources Recycling and Recovery (CalRecycle). 2019b.

Findings of Fact: The proposed Project includes an annexation, a General Plan Amendment, and a Zone Change that would allow for industrial development consistent with the City of Industry’s Industrial (M) zoning designation. The Project site consists of two parcels: Assessor’s Parcel Number (APN) 8206-027-058, which is currently located within the City of Industry, and APN 8206-027-080, which is located in unincorporated County of Los Angeles, and would be annexed into the City as part of the proposed Project. This IS/MND evaluates the environmental impacts of the specific proposed Project—a new 140,720-square-foot industrial building—representing the reasonably foreseeable development enabled by these entitlements. While the Industrial (M) zone permits a range of uses with potentially greater environmental impacts (e.g., high-cube warehouses or e-commerce centers), this analysis conservatively evaluates the Project as proposed and does not speculate on future or alternative uses. Therefore, the findings of this section reflect the maximum anticipated environmental effects associated with the proposed Project.

Based on a review of the proposed Project, site-specific conditions, and applicable utility provider data, the City finds that the Project would not result in significant impacts related to utilities and service systems. The Project would not require or result in the expansion or relocation of utility infrastructure that could cause significant environmental effects. The Project would not exceed available capacity for water supply, wastewater treatment, or solid waste disposal, and would comply with all applicable state and local regulations regarding utility services. Therefore, all impacts related to utilities and service systems would be less than significant, and no mitigation measures are required.

The proposed Project involves redevelopment of a previously developed site within an existing urbanized area of the City. Utilities, including water, wastewater, electricity, natural gas, telecommunications, and solid waste services, are currently available and will continue to serve the site. Will serve letters for electric, gas, sewer, storm drain, and telephone/cable services have been issued for the proposed Project and are included in Appendix I.

Water and Wastewater
Potable water service will be provided by the San Gabriel Valley Water Company, which sources water from the Main San Gabriel and Central Groundwater Basins. According to the company’s 2020 Urban Water Management Plan (UWMP), sufficient water supplies exist to meet projected demand during normal, dry, and multiple dry years. Wastewater generated by the Project will be treated at the San Jose Creek Water Reclamation Plant (SJCWRP), which has adequate capacity and is regulated under a National Pollutant Discharge Elimination System (NPDES) permit. The Project’s water and wastewater demand is consistent with typical industrial uses and would not require the construction or expansion of treatment facilities.

Stormwater
Stormwater will be managed through on-site systems designed to meet Low Impact Development (LID) requirements. No off-site stormwater infrastructure expansion is required. Drainage from the site will be treated and retained in compliance with City standards and Regional Water Quality Control Board requirements.

Page 617 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 97 ends

Electricity, Natural Gas, and Telecommunications
The Project will be served by Southern California Edison for electricity and Southern California Gas Company (SoCalGas) for natural gas. These utilities have sufficient regional capacity, and no new or expanded off-site infrastructure is required. Telecommunications services will be provided by existing providers (e.g., AT&T, Time Warner, Frontier), and service can be accommodated through existing infrastructure.

Solid Waste
Solid waste will be collected by Valley Vista Services, the City’s contracted hauler, and disposed of or processed at local Los Angeles County Sanitation District (LACSD) facilities, including the Puente Hills Landfill, Material Recovery Facility (MRF), and Intermodal Facility (PHIMF). The Project is expected to generate approximately 8,543 pounds of solid waste per day, which is within the capacity of local facilities. The Project will comply with AB 939, AB 341, and AB 1826 related to solid waste reduction, recycling, and organics management, in accordance with the City’s waste management ordinance.

Discussion of Impacts
Would the project:
a) Require or result in the relocation or construction of new or expanded water or wastewater treatment or storm water drainage, electric power, natural gas, or telecommunications facilities, the construction or relocation of which could cause significant environmental effects?
Less than Significant Impact:

Water Demand Impacts
The Project site is served by the San Gabriel Valley Water Company (SGVWC), which sources water from local groundwater basins and imported supplies. Water will be provided via an existing main in E. Valley Boulevard. Project water demand is comparable to other similar land uses and does not require the construction or expansion of water facilities. No off-site utility expansions or new infrastructure are required to support the tanks. The tanks are for emergency use only and do not represent an ongoing operational water demand.

Therefore, impacts would be less than significant.

Wastewater Treatment Impacts
Wastewater will be treated at the San Jose Creek Water Reclamation Plant, which has sufficient capacity and is regulated under the NPDES permit. The Project would generate wastewater typical of similar industrial uses and would not require new or expanded treatment facilities. Therefore, impacts would be less than significant.

Page 618 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 98 ends

Electric Power Impacts
Southern California Edison would provide electricity. Project demand would be accommodated by existing infrastructure, and no new or expanded electrical facilities would be needed. Impacts would be less than significant.

Natural Gas Impacts
Natural gas would be supplied by SoCalGas for HVAC and water heating. According to SoCalGas’s 2022–2026 Gas Acquisition Plan, as well as forecasts from the California Energy Commission and the California Public Utilities Commission, systemwide natural gas demand is projected to decline due to building electrification, energy efficiency improvements, and decarbonization policies. As a result, the Project’s relatively minor demand would not require new or expanded natural gas infrastructure. Impacts would be less than significant.

Telecommunication Facilities Impacts
Services from existing providers (e.g., AT&T, Time Warner, Frontier) would serve the Project site. No new or expanded telecommunications facilities are required. Impacts would be less than significant.
b) Have sufficient water supplies available to serve the project and reasonably foreseeable future development during normal, dry, and multiple dry years? Less than Significant Impact: San Gabriel Valley Water Company provides potable and domestic water to the Project area. San Gabriel’s water supply utilizes locally produced groundwater from 31 wells located in the Main San Gabriel Groundwater Basin and from 4 wells located in the Central Groundwater Basin. According to the 2020 UWMP for SGVWC, San Gabriel has not experienced water supply constraints or deficiencies. Table 19-1 describes data from the UWMP which shows that San Gabriel’s supply for base years for average, single dry, and multiple dry years are sufficient in meeting historical water demands (UWMP, 2020).

Table 19-1 Multiple Dry Years Supply and Demand Comparison 2025 2030 2035 2040 2045
First Year
Supply Totals 40,222 40,751 41,285 41,713 42,144
Demand Totals 40,222 40,751 41,285 41,713 42,144
Difference 0 0 0 0 0
Second Year
Supply Totals 41,385 41,930 42,479 42,919 43,363
Demand Totals 41,385 41,930 42,479 42,919 43,363
Difference 0 0 0 0 0
Third Year
Supply Totals 46,289 46,899 47,513 48,005 48,501
Demand Totals 46,289 46,899 47,513 48,005 48,501
Difference 0 0 0 0 0

Page 619 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 99 ends

Fourth Year
Supply Totals 45,157 45,751 46,350 46,831 47,315
Demand Totals 45,157 45,751 46,350 46,831 47,315
Difference 0 0 0 0 0
Fifth Year
Supply Totals 36,072 36,547 37,025 37,409 37,796
Demand Totals 36,072 36,547 37,025 37,409 37,796
Difference 0 0 0 0 0
As illustrated in Table 19-1, SGVWC’s water demands can be met under multiple dry years.

Future water supply will meet projected demand due to diversified supply and conservation measures. San Gabriel Valley Water Company has sufficient water resources available to supply water service to the property. Therefore, impacts associated with water supply availability would be less than significant.
c) Result in a determination by the wastewater treatment provider which serves or may serve the project that it has adequate capacity to serve the project’s projected demand in addition to the provider’s existing commitments?
Less than Significant Impact: SJCWRP has a design capacity of 100 million gallons of wastewater per day (MGD). SJCWRP serves a population of approximately 1,000,000, and approximately 48 MGD of the reclaimed water is reused at over 170 different reuse sites.

The Project received a will-serve letter from Los Angeles County Sanitation Districts that the district has capacity to service the Project (Appendix N). The Project would pay applicable sewer connection and service fees, providing funds available for the LACSD wastewater system expansion and maintenance, acting to offset the Project’s incremental demands for wastewater collection and treatment services. Given that the Project proposes a land use that is permitted within the Industrial (M) zone and the Employment land use designation, wastewater from the proposed Project is not anticipated to exceed the capacity of the wastewater treatment provider, even when considering existing and cumulative demand.

Impacts are expected to be less than significant.
d) Generate solid waste in excess of State or local standards, or in excess of the capacity of local infrastructure, or otherwise impair the attainment of solid waste reduction goals? Less than Significant Impact: Locally generated solid waste is deposited into three (3) LACSD solid waste facilities located within the City: the Puente Hills Landfill, the Puente Hills Material Recovery Facility (MRF), and the Puente Hills Intermodal Facility (PHIMF).

Although the proposed Project has a smaller building footprint than the prior commercial use, the change to industrial operations could result in a minor increase in solid waste generation due to the differing types and volumes of waste associated with industrial activities. Therefore, the Project would result in a slight increase in solid waste generated in the City. Solid waste is collected in the City through a franchise agreement (Section

8.20.060 of the City’s Code). Valley Vista Services is the City’s contracted franchise hauler to support commercial and industrial businesses with meeting the State’s recycling requirements. The Project would comply with the Integrated Waste Management Ordinance (Section 8.20) adopted by the City. The Applicant is proposing to construct one (1) new industrial building totaling 140,720 square feet. Industrial waste, defined in Section 17225.35 of Title 14 of the California Code of Regulations, is not subject to the requirements

Page 620 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 100 ends

of the AB 341 regulation (CalRecycle, 2019b). Based on the CalRecycle Industrial Section Generation Rates chart, the Project would generate approximately 8,543 pounds of solid waste per day.

Table 19-2 Estimated Solid Waste Generation
Waste Generation
Source Square Feet Generation Rate, pounds per day
Per square foot Total
Industrial 140,720 .0625 pounds 8,483 (lbs/day)
Office 10,000 0.006 pounds 60 (lbs/day)
Source: CalRecycle, 2019b, Estimated Solid Waste Generation Rates (ca.gov) The Project would consist of one (1) building totaling 140,720 square feet for warehouse space, with the remaining 10,000 square feet split between two stories for office space.

Commercial solid waste generated at an industrial facility or site, for example paper, plastic, metals, cardboard, etc., could be subject to the requirements of the regulation provided the facility/site generates four or more cubic yards of commercial solid waste per week. The Project would participate in the City’s commercial recycling and waste reduction program to comply with AB 939, AB 341 and AB 1826.

The industrial uses proposed by the Project, and solid waste generated by those uses, would not otherwise conflict with federal, state, and local statutes and regulations related to solid waste. Based on the preceding, the potential for the Project to generate solid waste in excess of State or local standards, or in excess of the capacity of local infrastructure, or otherwise impair the attainment of solid waste reduction goals is less than significant. e) Comply with federal, state, and local management and reduction statutes and regulations related to solid waste?
Less than Significant Impact: The Project would be implemented and operated in compliance with applicable City General Plan Goals and Policies, and would conform with City Zoning regulations—specifically, the Project would comply with local, state, and federal initiatives and directives acting to reduce and divert solid waste from landfill waste streams.

As described in section (d) above, the Project would comply with the California Integrated Waste Management Act of 1989 (AB 939) and AB 341 as implemented by the City. The proposed Project is required to comply with applicable federal, state, County, and City statues and regulations related to solid waste as a standard project condition of approval.

Therefore, a less than significant impact would occur.

Page 621 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 101 ends

Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact
No Impact
XX. Wildfire – If located in or near a State Responsibility Areas (“SRA”), lands classified as very high fire hazard severity zones, would the project:
a) Substantially impair an adopted
emergency response plan or emergency
evacuation plan?
b) Due to slope, prevailing winds, and other
factors, exacerbate wildfire risks, and
thereby expose project occupants to,
pollutant concentrations from a wildfire or
the uncontrolled spread of a wildfire?
c) Require the installation or maintenance of
associated infrastructure (such as roads,
fuel breaks, emergency water sources,
power lines or other utilities) that may
exacerbate fire risk or that may result in
temporary or ongoing impacts to the
environment?
d) Expose people or structures to significant
risks, including downslope or downstream
flooding or landslides, as a result of runoff,
post-fire slope instability, or drainage
changes?
Project Impacts and Mitigation Measures
Sources:
• City of Industry 2014 General Plan (adopted June 12, 2014) • California Department of Forestry and Fire Protection. Fire Hazard Severity Zones Map • County of Los Angeles Operational Area Emergency Operations Plan (November 2023) Findings of Fact: Based on a review of the Project site conditions, applicable regulations, and fire hazard mapping, the City of Industry, acting as Lead Agency, finds that the proposed Project would not result in significant impacts related to wildfire hazards. The Project site is located within a fully urbanized area of the City and unincorporated County of Los Angeles, and is designated as a Local Responsibility Area (LRA) under the jurisdiction of the Los Angeles County Fire Department (LACFD). The site is not located within a State Responsibility Area (SRA) and is not designated as a Very High Fire Hazard Severity Zone (VHFHSZ) according to the CAL FIRE Hazard Severity Zone maps. The nearest designated fire hazard zone is located approximately

1.1 miles southwest of the Project site, south of State Route 60 (SR-60).

Page 622 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 102 ends

Although the site is not located in a mapped wildfire hazard zone, urban fires can occur, particularly in areas containing flammable materials. However, the Project site is generally flat, lacks adjacent wildland vegetation, and does not present conditions (e.g., steep slopes, strong prevailing winds, or extensive fuel loads) that would significantly increase wildfire risk. Fire protection and emergency medical services are provided by the LACFD, which implements a comprehensive inspection and fire prevention program to reduce potential fire hazards.

Additionally, the Project will be required to comply with all applicable provisions of the California Fire Code and Title 24 of the California Code of Regulations, including fire safety standards for building construction and site access.

Based on these conditions and regulatory requirements, the proposed Project would not substantially increase wildfire risk, impair emergency response, or expose people or structures to post-fire hazards. As a result, no significant impacts related to wildfire would occur, and mitigation measures are not required.

Discussion of Impacts
If located in or near a State Responsibility Areas (“SRA”), lands classified as very high fire hazard severity zones, would the project:
a) Substantially impair an adopted emergency response plan or emergency evacuation plan? No Impact: The Project site is not located in a State Responsibility Area (SRA) or a Very High Fire Hazard Severity Zone (VHFHSZ) per CAL FIRE maps. Emergency response in the area is governed by the Los Angeles County Operational Area Emergency Response Plan (OAERP). The Project will not block emergency access or impede evacuation routes.

Traffic control measures and notifications during construction will ensure continued emergency access. In addition, three (3) existing fire hydrants located along the Project frontages on Valley Boulevard and S. 6th Avenue will remain and continue to serve the area.

Therefore, the Project would not impair an emergency response or evacuation plan, and no impact would occur.
b) Due to slope, prevailing winds, and other factors, exacerbate wildfire risks, and thereby expose project occupants to pollutant concentrations from a wildfire or the uncontrolled spread of a wildfire?
Less than Significant Impact: The Project site is relatively flat and located in a fully urbanized area. There are no steep slopes or wildlands adjacent to the site. The nearest VHFHSZ is located approximately 1.1 miles southwest. Prevailing winds are generally light and do not present a significant wildfire risk in this location. As a result, the Project would not expose occupants to significant pollutant concentrations or increased wildfire spread. c) Require the installation or maintenance of associated infrastructure (such as roads, fuel breaks, emergency water sources, power lines or other utilities) that may exacerbate fire risk or that may result in temporary or ongoing impacts to the environment? Less than Significant Impact: The Project involves redevelopment of a previously developed site. The proposed building will not exacerbate fire risk; rather, they provide a

Page 623 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 103 ends

localized emergency water source to be used by the Fire Department and internal sprinkler system during a fire. Improvements include internal circulation, parking, and landscaping, all of which will comply with applicable fire codes and regulations. Therefore, impacts would be less than significant.
d) Expose people or structures to significant risks, including downslope or downstream flooding or landslides, as a result of runoff, post-fire slope instability, or drainage changes? Less than Significant Impact: The Project site is flat with no landslide-prone topography.

Drainage will be handled via on-site retention systems that meet Low Impact Development (LID) standards, including infiltration basins designed to capture and treat runoff from new impervious surfaces. Post-development runoff will be reduced compared to existing conditions. Therefore, no significant risks related to post-fire instability or drainage changes would occur.

Page 624 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 104 ends

Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact
No Impact
XXI. Mandatory Findings of Significance
a) Does the project have the potential to
substantially degrade the quality of the
environment, substantially reduce the
habitat of a fish or wildlife species, cause a
fish or wildlife population to drop below
self-sustaining levels, threaten to eliminate
a plant or animal community, substantially
reduce the number or restrict the range of
a rare or endangered plant or animal or
eliminate important examples of the major
periods of California History or prehistory?
b) Does the project have impacts that are
individually limited, but cumulatively
considerable? (Cumulatively considerable
means that the incremental effects of a
project are considerable when viewed in
connection with the effects of past projects,
the effects of other current projects, and
the effects of probable future projects)?
c) Does the project have environmental
effects which will cause substantial
adverse effects on human beings, either
directly or indirectly?
Discussion of Impacts
a) Does the project have the potential to substantially degrade the quality of the environment, substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self-sustaining levels, threaten to eliminate a plant or animal community, substantially reduce the number or restrict the range of a rare or endangered plant or animal or eliminate important examples of the major periods of California History or prehistory? Less than Significant Impact with Mitigation Incorporated: The proposed Project would not substantially impact any scenic vistas, scenic resources, or the visual character of the area, and would not result in excessive light or glare. The Project site is located within a developed area that contains light industrial uses and commercial uses. The proposed Project would not significantly impact any sensitive plants, plant communities, fish, wildlife, or habitat for any sensitive species. As described in Section IV. Biological Resources, adverse impacts to biological resources would be less than significant with the implementation of pre-construction nesting bird surveys as implemented by Mitigation Measure BIO-1.

Page 625 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 105 ends

As described in Section V. Cultural Resources and XVIII. Tribal Cultural Resources, adverse impacts to historical resources would be less than significant. Construction-phase procedures would be implemented if any cultural, archaeological, or paleontological resources are discovered during grading, consistent with Mitigation Measures CUL-1 and TCR-1 through TCR-3. Furthermore, the analysis provided in Section III. Air Quality and VIII. Greenhouse Gas emissions concludes that impacts related to emissions of criteria pollutants, climate change, and other air quality impacts would be less than significant.

Based on the preceding analysis of potential impacts in the responses to Sections I through XX, no evidence is presented that the proposed Project would degrade the quality of the environment. Impacts related to degradation of the environment, biological resources, and cultural resources would be less than significant with mitigation incorporated. b) Does the project have impacts that are individually limited, but cumulatively considerable? (Cumulatively considerable means that the incremental effects of a project are considerable when viewed in connection with the effects of past projects, the effects of other current projects, and the effects of probable future projects)? Less than Significant Impact: Cumulative impacts can result from the interactions of environmental changes resulting from one proposed Project with changes resulting from other past, present, and future projects that affect the same resources, utilities and infrastructure systems, public systems, transportation network elements, air basin, watershed, or other physical conditions. Such impacts could be short-term and temporary, usually consisting of overlapping construction impacts, as well as long-term, due to the permanent land use changes and operational characteristics involved with the proposed Project.

Implementation of the Project, in conjunction with other approved or pending projects in the region, would not result in cumulatively considerable impacts. Where appropriate, the environmental checklist questions above include discussion regarding cumulative impacts of the Project when developed in conjunction with related projects. As concluded throughout the analysis, the proposed Project would include both operation- and construction-related project components whose adherence to applicable regulations would ensure that the Project’s incremental contribution would be less than cumulatively considerable. Further, the Project would not achieve short-term environmental goals to the disadvantage of long-term goals.

Therefore, cumulatively considerable impacts would be considered less than significant. c) Does the project have environmental effects which will cause substantial adverse effects on human beings, either directly or indirectly?
Less than Significant Impact: Based on the analysis of the Project’s impacts in the responses to Sections I through XX, there is no indication that this Project could result in substantial adverse effects on human beings. While there would be a variety of temporary adverse effects during construction, these would be less than significant. There are no long-term effects related to traffic, noise, hazardous materials, emissions of criteria pollutants and greenhouse gas emissions, increased demand for water use, wastewater disposal, and electricity use, or increased demand on emergency response services. Environmental effects would result in less than significant impacts. Based on the analysis in this Initial Study, direct and indirect impacts to human beings would be less than significant.

Page 626 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 106 ends

CHAPTER FOUR – MITIGATION, MONITORING, AND REPORTING PROGRAM (MMRP) Mitigation measures are included within each section of the initial study checklist and are provided below. Table 22-1: Mitigation Monitoring and Reporting Program outlines the potential impacts and mitigation measures of the proposed Project and assigns responsibility for the oversight of each mitigation measure. This Table shall be included in all bid documents and included as a part of the Project development.

Table 22-1 Mitigation Monitoring and Reporting Program
Section
Number Mitigation Measures Responsible for Monitoring Timing Impact after Mitigation Biological Resources
IV. Biological
Resources
BIO-1: Pre-Construction Nesting Bird Survey
If it is not feasible to avoid the nesting bird season
(February 1st through August 31st), a qualified
biologist shall conduct a pre-construction nesting
bird survey for avian species to determine the
presence/absence, location, and status of any
active nests on or directly adjacent to the Project
Site. If active nests are located, the extent of the
survey buffer area surrounding the nest should be
established by the qualified biologist to ensure that
direct and indirect effects to nesting birds are
avoided. To avoid the destruction of active nests
and to protect the reproductive success of birds
protected by the MBTA and the California Fish and
Game Code (CFGC), the nesting bird survey shall
occur no earlier than 10 days prior to the
commencement of construction.

In the event that active nests are discovered, a
suitable buffer (distance to be determined by the
Applicant and City
of Industry
Prior to
construction
activities
Less than
Significant

Page 627 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 107 ends

Section
Number Mitigation Measures Responsible for Monitoring Timing Impact after Mitigation biologist) shall be established around such active
nests, and no construction within the buffer
allowed, until the biologist has determined that the
nest(s) is no longer active (i.e., the nestlings have
fledged and are no longer reliant on the nest).

Cultural Resources
V. Cultural
Resources
CUL-1: Inadvertent Archaeological Finds
If previously unidentified cultural materials are
unearthed during construction, work shall be halted
in that area until a qualified archaeologist can
assess the significance of the find. If human
remains are encountered, State Health and Safety
Code Section 7050.5 states that no further
disturbance shall occur until the County Coroner
has made a determination of origin and disposition
pursuant to Public Resources Code Section
5097.98. The County Coroner must be notified of
the find immediately. If the remains are determined
to be prehistoric, the Coroner will notify the Native
American Heritage Commission (NAHC), which
will determine and notify the Most Likely
Descendant (MLD). With the permission of the
landowner or his/her authorized representative, the
MLD may inspect the site of the discovery. The
MLD shall complete the inspection within 48 hours
of notification by the NAHC. The MLD may
recommend scientific removal and nondestructive
analysis of human remains and items associated
with Native American burials.

City of Industry
and Applicant
During ground
disturbing
activities
Less than
Significant

Page 628 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 108 ends

Section
Number Mitigation Measures Responsible for Monitoring Timing Impact after Mitigation Geology and Soils
VII. Geology
and Soils
GEO-1: General Earthwork and Grading
The Project shall incorporate applicable
recommendations provided in the Geotechnical
Due Diligence Exploration Report prepared by
Leighton Consulting, Inc. dated August 27, 2024
(Appendix B). The recommendations are
presented in Section 3.0 Conclusions and
Recommendations of the report under the
following subheadings: General Earthwork and
Grading, Site Preparation, Removal of
Undocumented Artificial Fill, Over excavation and
Recompaction, Mitigation of Potential Seismic
Settlement, Fill Placement and Compaction, Import
Fill Soil, Shrinkage and Subsidence, Rippability
and Oversized Material, Shallow Foundation
Recommendations, Minimum Embedment and
Width, Allowable Bearing, Lateral Load
Resistance, Increase in Bearing and Friction -
Short Duration Loads, Settlement Estimates,
Recommendations for Slabs-On-Grade, Seismic
Design Parameters, Retaining Walls, Preliminary
Pavement Design, Infiltration Recommendations,
Temporary Excavations, Trench Backfill, Geogrid
Installation, Surface Drainage, Sulfate Attack and
Corrosion Protection, Additional Geotechnical
Services (pages 16-34).

City of Industry
and Applicant
Prior to issuance
of grading permits
Less than
Significant

Page 629 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 109 ends

Section
Number Mitigation Measures Responsible for Monitoring Timing Impact after Mitigation VII. Geology
and Soils
GEO-2: Inadvertent Paleontological Discovery
In the event that paleontological resources are
inadvertently discovered during ground disturbing
activities, a qualified paleontologist shall document
the discovery as appropriate, evaluate the potential
resource, and assess the significance of the find
under the criteria set forth in CEQA Guidelines
Section 15064.5.

City of Industry During ground
disturbing
activities
Less that
Significant
Hazards and Hazardous Materials
IX. Hazards
& Hazardous
Materials
HAZ-1: Hazardous Materials Abatement and
Disposal
The Project Applicant shall ensure that all ACMs
and LBP identified in the Hazardous Materials
Survey Report (Appendix F) are handled and
disposed of in accordance with all applicable
federal, state, and local regulations, including but
not limited to:
• EPA NESHAP regulations (40 CFR 61, Subpart
M),
• OSHA standards for asbestos (29 CFR
1910.1001 and 1926.1101),
• OSHA standards for lead (29 CFR 1926.62), and
• SCAQMD Rule 1403.

All ACMs shall be removed by a certified asbestos
abatement contractor prior to demolition.

Additional inspections shall be conducted once the
buildings are vacated. Any additional suspect
Applicant and City
of Industry
Prior to issuance
of grading permits
Less than
Significant

Page 630 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 110 ends

Section
Number Mitigation Measures Responsible for Monitoring Timing Impact after Mitigation materials exposed during demolition shall be
tested and properly managed. LBP impacts shall
be managed with protective measures including
engineering controls, respiratory protection, and
personal protective equipment.

IX. Hazards
& Hazardous
Materials
HAZ-2: Universal Waste
Prior to demolition, the Project Applicant shall
ensure the proper removal, recycling, or disposal
of all universal waste materials identified in the
Hazardous Materials Survey (Appendix F),
including fluorescent lightbulbs, ballasts, HVAC
equipment, gas cylinders, solvents, and
electronics. A licensed hazardous waste hauler
shall be retained to ensure proper handling and
disposal in compliance with DTSC regulations.

Applicant and City
of Industry
Prior to issuance
of grading permits
Less than
Significant
IX. Hazards
& Hazardous
Materials
HAZ-3: Preparation and Implementation of Soil
Management Plan (SMP)
Prior to any ground-disturbing activities associated
with future development, the Project Applicant
shall retain a qualified environmental professional
to prepare a Soil Management Plan (SMP) to
address potential hazardous materials, including
residual volatile organic compounds (VOCs) in soil
gas, per- and polyfluoroalkyl substances (PFAS) in
soil, and hydrocarbon-impacted soil identified
along the eastern portion of the site. Due to the
potential for vapor intrusion from off-site sources,
the SMP shall include an evaluation of vapor
intrusion risk by a qualified environmental
professional. If vapor intrusion is determined to be
Applicant and City
of Industry
Prior to issuance
of grading permits
Less than
Significant

Page 631 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 111 ends

Section
Number Mitigation Measures Responsible for Monitoring Timing Impact after Mitigation a concern based on applicable screening levels
and site conditions, a Vapor Intrusion Mitigation
Plan (VIMP) shall be prepared and implemented.

The VIMP shall identify appropriate design
features or controls (e.g., vapor barriers or sub-slab depressurization systems) to protect future occupants from potential vapor intrusion. The
evaluation and, if warranted, the VIMP shall be
submitted to the City for review and approval prior
to issuance of grading permits, and all applicable
measures shall be implemented during site
development. The SMP shall outline procedures
for the proper characterization, handling, storage,
and disposal of contaminated soil during earthwork
activities. The SMP shall include worker health and
safety protocols, soil stockpiling and segregation
guidelines, contingency measures for unknown
contamination, and regulatory notification
procedures, as applicable. The SMP (and VIMP, if
applicable) shall be submitted to the City for review
and approval prior to issuance of grading permits,
and all provisions of the approved SMP shall be
implemented during site development.

Hydrology and Water Quality
X. Hydrology
and Water
Quality
HYD-1: WQMP and Hydrology Report
Compliance
Prior to grading permit issuance, the Applicant
shall update the Water Quality Management Plan
(WQMP) (Appendix H) and Hydrology Report
(Appendix I) to incorporate all recommendations
City of Industry
and Applicant
Prior to issuance
of grading permits
Less than
Significant

Page 632 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 112 ends

Section
Number Mitigation Measures Responsible for Monitoring Timing Impact after Mitigation from the peer review conducted by Casc
Engineering and Consulting (May 2025)
(Appendices J and J.1). The Applicant shall then
submit a complete and revised Low Impact
Development (LID) Plan, WQMP, and Hydrology
Report in compliance with the Los Angeles County
MS4 NPDES Permit (Order No. R4-2021-0105,
NPDES Permit No. CAS004004) to the City of
Industry for review and approval.

X. Hydrology
and Water
Quality
HYD-2: SWPPP Preparation and Construction
General Permit Coverage
The Applicant shall prepare a Stormwater Pollution
Prevention Plan (SWPPP) and obtain coverage
under the Construction General Permit (CGP) from
the State Water Resources Control Board prior to
commencement of construction activities.

City of Industry
and Applicant
Prior to issuance
of grading permits
Less than
Significant
X. Hydrology
and Water
Quality
HYD-3: Industrial General Permit Compliance
for Project Operations
The Applicant shall obtain coverage under the
Industrial General Permit (IGP) for long-term
operations and comply with all monitoring and
reporting requirements.

City of Industry
and Applicant
Prior to issuance
of grading permits
Less than
Significant
Tribal Cultural Resources
XVIII. Tribal
Cultural
Resources
TCR-1: Retain a Native American Monitor
Prior to Commencement of Ground
Disturbing Activities
A) The Project applicant/lead agency shall
retain a Native American Monitor from or
Applicant and City
of Industry
Prior to ground
disturbing
activities
Less than
Significant

Page 633 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 113 ends

Section
Number Mitigation Measures Responsible for Monitoring Timing Impact after Mitigation approved by the Gabrieleño Band of Mission
Indians – Kizh Nation. The monitor shall be
retained prior to the commencement of any
“ground-disturbing activity” for the subject Project
at all Project locations (i.e., both on-site and any
off-site locations that are included in the Project
description/definition and/or required in
connection with the Project, such as public
improvement work). “Ground-disturbing activity”
shall include, but is not limited to, demolition,
pavement removal, potholing, auguring,
grubbing, tree removal, boring, grading,
excavation, drilling, and trenching.

B) A copy of the executed monitoring
agreement shall be submitted to the lead agency
prior to the earlier of the commencement of any
ground-disturbing activity, or the issuance of any
permit necessary to commence a ground-disturbing activity.

C) The monitor will complete daily monitoring
logs that will provide descriptions of the relevant
ground-disturbing activities, the type of
construction activities performed, locations of
ground disturbing activities, soil types, cultural-related materials, and any other facts, conditions, materials, or discoveries of significance to the
Tribe. Monitor logs will identify and describe any
discovered TCRs, including but not limited to,
Native American cultural and historical artifacts,
remains, places of significance, etc., (collectively,
tribal cultural resources, or “TCR”), as well as any
discovered Native American (ancestral) human

Page 634 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 114 ends

Section
Number Mitigation Measures Responsible for Monitoring Timing Impact after Mitigation remains and burial goods. Copies of monitor logs
will be provided to the Project applicant/lead
agency upon written request to the Tribe.

D) On-site tribal monitoring shall conclude upon
the latter of the following (1) written confirmation
to the Kizh from a designated point of contact for
the Project applicant/lead agency that all ground-disturbing activities and phases that may involve ground-disturbing activities on the Project site or
in connection with the Project are complete; or (2)
a determination and written notification by the
Kizh to the Project applicant/lead agency that no
future, planned construction activity and/or
development/construction phase at the Project
site possesses the potential to impact Kizh TCRs.

XVIII. Tribal
Cultural
Resources
TCR-2: Unanticipated Discovery of Tribal
Cultural Resources Objects (Non-Funerary/Non-Ceremonial) A) Upon discovery of any TCRs, all
construction activities in the immediate vicinity of
the discovery shall cease (i.e., not less than the
surrounding 50 feet) and shall not resume until
the discovered TCR has been fully assessed by
the Kizh monitor and/or Kizh archaeologist. The
Kizh will recover and retain all discovered TCRs
in the form and/or manner the Tribe deems
appropriate, in the Tribe’s sole discretion, and for
any purpose the Tribe deems appropriate,
including for educational, cultural and/or historic
purposes.

Applicant and City
of Industry
During ground
disturbing
activities
Less than
Significant

Page 635 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 115 ends

Section
Number Mitigation Measures Responsible for Monitoring Timing Impact after Mitigation XVIII. Tribal
Cultural
Resources
TCR-3: Unanticipated Discovery of Human
Remains and Associated Funerary or
Ceremonial Objects
A) Native American human remains are
defined in PRC 5097.98(d)(1) as an inhumation
or cremation, and in any state of decomposition
or skeletal completeness. Funerary objects,
called associated grave goods in Public
Resources Code Section 5097.98, are also to be
treated according to this statute.

B) If Native American human remains and/or
grave goods are discovered or recognized on the
Project site, then Public Resource Code 5097.9
as well as Health and Safety Code Section
7050.5 shall be followed.

C) Human remains and grave/burial goods
shall be treated alike per California Public
Resources Code section 5097.98(d)(1) and (2).

D) Preservation in place (i.e., avoidance) is
the preferred manner of treatment for discovered
human remains and/or burial goods.

E) Any discovery of human remains/burial
goods shall be kept confidential to prevent
further disturbance.

Applicant and City
of Industry
During ground
disturbing
activities
Less than
Significant

Page 636 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 116 ends

CHAPTER FIVE– REFERENCES AND PREPARERS

5.1 References Cited
6th Street Air Quality and Greenhouse Gas Assessment. Urban Crossroads, Inc. December 24, 2025. (Appendix A)
2023 California Environmental Quality Act (CEQA) Statute and Guidelines. Association of Environmental Professionals 2023.
2022 California Gas Report. California Gas and Electric Utilities, 2022 Joint_Utility_Biennial_Comprehensive_California_Gas_Report_2022.pdf (socalgas.com) 2023 California Gas Report Supplement. California Gas and Electric Utilities, 2023 2023 Supplemental California Gas Report (pge.com)
A-NET. L.A. County’s Airport Land Use Commission Site. County of Los Angeles. A-NET (arcgis.com)
California Air Resources Board. Guide to Off-Road Vehicle & Equipment Regulations. In-Use Off-Road Diesel-Fueled Fleets Regulation | California Air Resources Board California Department of Conservation (CDC). California Important Farmland Finder (CIFF). 2016.

DLRP Important Farmland Finder (ca.gov)
California Department of Conservation (CDC). SMRA Mineral Land Use Classification 2015. CGS Information Warehouse (ca.gov)
California Department of Fish and Wildlife. BIOS Habitat Connectivity Viewer. BIOS Viewer@CDFW (ca.gov)
California Department of Forestry and Fire Protection. Fire Hazard Severity Zones Map. FHSZ Viewer (ca.gov)
California Department of General Services. California Building Standards Code (Title 24, 2022).

Codes (ca.gov)
California Department of Transportation. List of Eligible and Officially Designated State Scenic Highways. 2019. California State Scenic Highway System Map (arcgis.com) California Energy Commission. Clean Energy and Pollution Reduction Act – SB 350. 2022. Clean Energy and Pollution Reduction Act - SB 350 (ca.gov)
California Energy Commission. Joint Energy Report – SB 100. 2022. SB 100 Joint Agency Report (ca.gov)
City of Industry 2014 General Plan Final Environmental Impact Report. Certified June 12, 2014.

City of Industry 2014 General Plan. Adopted June 12, 2014. 2014 General Plan (cityofindustry.org)
City of Industry Municipal Code. Industry, California Municipal Code (qcode.us)

Page 637 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 117 ends

Consideration of Resolution No CC 2020-20 (...) Adopting Vehicle Miles Traveled Thresholds of Significance for Purposes of Analyzing Transportation Impacts under CEQA. City of Industry. June 25, 2020. ShowDocument (cityofindustry.org) County of Los Angeles General Plan 2035. Updated July 14, 2022. General Plan 2035 | DRP (lacounty.gov)
County of Los Angeles Operational Area Emergency Operations Plan (November 2023) County of Los Angeles Operational Area Emergency Operations Plan Department of Homeland Security. FEMA Flood Map Service Center. December 2021. FEMA Flood Map Service Center | Search By Address
Estimated Solid Waste Generation Rates. California Department of Resources Recycling and Recovery (CalRecycle). 2019a. Estimated Solid Waste Generation Rates (ca.gov) Fire Hazard Severity Zones in State Responsibility Area Geotechnical Due Diligence Exploration Proposed Industrial Warehouse Development, 110 South 6th Avenue City of Industry, Los Angeles County, California. Leighton Consulting, Inc. August 27, 2024. (Appendix B)
Geotechnical Peer Review Proposed CapRock Partners Warehouse Project 184 South 6th Avenue. City of Industry, CA. Terracon, Consultants, Inc. April 11, 2025. (Appendix C) GIS-NET Public. Planning & Zoning Information for Unincorporated L.A. County, Department of Regional Planning. GIS-NET Public (lacounty.gov)
Hazardous Materials Survey Report, Valley Centre Business Park, Partner Engineering and Science, Inc. July 26, 2024. (Appendix F)
Hazardous Materials Survey Report Peer Review Proposed Caprock Partners Warehouse Project 184 6th Avenue. Terracon, Consultants, Inc. April 11, 2025. (Appendix G) Hydrology Report for Valley Center, David Evans and Associates, Inc. July 2025. (Appendix I) Los Angeles County Sanitation Districts (LACSD). Wastewater (Sewage) Facilities San Jose Creek Water Reclamation Plant | Los Angeles County Sanitation Districts (lacsd.org) Memorandum VMT Analysis – 184 S. Sixth Avenue. CNC Engineering, January 31, 2025. (Appendix M)
National Parks Service, U.S. Department of the Interior. National Register of Historic Places.

National Register of Historic Places (nps.gov)
National Land Cover Database Class Legend and Description (NLCD). Accessed April 2, 2025.

National Land Cover Database Class Legend and Description | Multi-Resolution Land Characteristics (MRLC) Consortium
Noise Impact Report Valley Centre Business Park, Yorke Engineering, LLC. April 2025. (Appendix K)
Environmental Peer Review Proposed CapRock Partners Warehouse Project 184 South 6th Avenue. Terracon, Consultants, Inc. April 11, 2025. (Appendix E) Peer Review of Hydrology & WQMP Study for Valley Cetner, APNs 8206-027-058, 8206-027- 080. Casc Engineering and Consulting, April 21, 2025.(Appendix J)

Page 638 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 118 ends

Phase I Environmental Site Assessment & Limited Phase II Subsurface Investigation Report.

Hillmann Consulting LLC. September 18, 2024. (Appendix D) San Gabriel Valley Water Company, 2020 Urban Water Management Plan Suburban Water Systems (UWMP). June 2021.

San Gabriel River Corridor Master Plan. County of Los Angeles Department of Public Works.

Moore lacofano Goltsman, Inc. June 2006. Master Plan_final.qxd (lacounty.gov) Second Peer Review of the Hydrology Report for Valley Cetner, APNs 8206-027-058, 8206-027- 080. Casc Engineering and Consulting, May 7, 2025. (Appendix J.1) Second Peer Review of the WQMP Report for Valley Cetner, APNs 8206-027-058, 8206-027- 080. Casc Engineering and Consulting, May 7, 2025. (Appendix J) South Coast Air Quality Management District (SCAQMD) Air Quality Management Plan (AQMP). adopted December 2, 2022. final-2022-aqmp.pdf (aqmd.gov) Technical Memorandum 184 South 6th Street Industrial Park Redevelopment Second 3rd Party Review. Urban Crossroads, Inc. May 7, 2025. (Appendix L) U.S. Department of Transportation. Federal Highway Administration. Construction Noise Handbook. Chapter 9.0 “Construction Equipment Noise Levels and Ranges.” August 2006. 9.0 Construction Equipment Noise Levels and Ranges - Handbook - Construction Noise - Noise - Environment - FHWA (dot.gov)
U.S. Fish and Wildlife Service. National Wetlands Inventory, Surface Water and Wetlands.

National Wetlands Inventory (usgs.gov)
Will Serve Documents (Appendix I)
WQMP Report for Valley Center, David Evans and Associates, Inc. July 2025. (Appendix H)

Page 639 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
May 6, 2026

Page 119 ends

5.2 List of Preparers
City of Industry
Eduardo Manriquez, Contract Senior Planner
CASC Engineering and Consulting, Inc.

Frank Coyle, Director of Planning
Jessie Bruckhart, Senior Planner
Ben Hamada, GIS Specialist

Page 640 of 9818 ends

CIRCULATION DRAFT
City of Industry
South 6th Avenue Industry Redevelopment
Initial Study/Mitigated Negative Declaration
April 28, 2026

APPENDIX A
Air Quality and Greenhouse Assessment

Page 641 of 9818 ends

TECHNICAL MEMORANDUM
20341 SW Birch Street | Suite 230 | Newport Beach, CA 92660 | (949) 660-1994 | urbanxroads.com DATE: December 24, 2025
TO: Mandi Needles, CASC Engineering & Consulting
FROM: Haseeb Qureshi, Ali Dadabhoy, Shannon Wong, Urban Crossroads, Inc.

JOB NO: 16463-02 AQ & GHG Assessment
SUBJECT: 6TH STREETAIR QUALITY ANDGREENHOUSE GASASSESSMENT Urban Crossroads, Inc. is pleased to provide the following Air Quality and Greenhouse Gas Assessment for the 6th Street (Project), which is located at 184 South 6th Avenue in the City of Industry. The Project site consists of two (2) parcels: Accessor’s Parcel Numbers (APNs) 8206-027- 058 and -080.

PROJECT OVERVIEW
The proposed building consists of 135,720 square-feet of warehouse space, 10,000 square-feet of office space split between two stories located at the front of the building, and 5,000 square-feet of mezzanine, resulting in a total floor area of 140,720 square feet, as shown in Exhibit 1. The Project is anticipated to have an opening year of 2027.

SUMMARY OF FINDINGS
Results of the assessment indicate that the Project would result in a less than significant impact with respect to air quality and greenhouse gases.

Page 642 of 9818 ends

16463-03 AQ & GHG Assessment 2 6th Street
EXHIBIT 1: SITE PLAN
LEGEND:
[: ! Site Boundary

Page 643 of 9818 ends

16463-03 AQ & GHG Assessment 3 6th Street

PROJECT AIR QUALITY IMPACTS

AIR QUALITY SETTING
South Coast Air Basin (SCAB)
The Project site is located in the SCAB within the jurisdiction of South Coast Air Quality Management District (SCAQMD) (1). The SCAQMD was created by the 1977 Lewis-Presley Air Quality Management Act, which merged four county air pollution control bodies into one regional district.

Under the Act, the SCAQMD is responsible for bringing air quality in areas under its jurisdiction into conformity with federal and state air quality standards. As stated, the Project site is located within the SCAB, a 6,745-square-mile subregion of the SCAQMD, which includes portions of Los Angeles, Riverside, and San Bernardino Counties, and all of Orange County.

The SCAB is bounded by the Pacific Ocean to the west and the San Gabriel, San Bernardino, and San Jacinto Mountains to the north and east. The Los Angeles County portion of the Mojave Desert Air Basin is bounded by the San Gabriel Mountains to the south and west, the Los Angeles / Kern County border to the north, and the Los Angeles / San Bernardino County border to the east. The Riverside County portion of the Salton Sea Air Basin is bounded by the San Jacinto Mountains in the west and spans eastward up to the Palo Verde Valley.

Regional Climate
The regional climate has a substantial influence on air quality in the SCAB. In addition, the temperature, wind, humidity, precipitation, and amount of sunshine influence the air quality.

The annual average temperatures throughout the SCAB vary from the low to mid 60s (degrees Fahrenheit [°F]). Due to a decreased marine influence, the eastern portion of the SCAB shows greater variability in average annual minimum and maximum temperatures. January is the coldest month throughout the SCAB, with average minimum temperatures of 47°F in downtown Los Angeles and 36°F in San Bernardino. All portions of the SCAB have recorded maximum temperatures above 100°F.

Although the climate of the SCAB can be characterized as semi-arid, the air near the land surface is quite moist on most days because of the presence of a marine layer. This shallow layer of sea air is an important modifier of SCAB climate. Humidity restricts visibility in the SCAB, and the conversion of sulfur dioxide (SO2) to sulfates (SO4) is heightened in air with high relative humidity. The marine layer provides an environment for that conversion process, especially during the spring and summer months. The annual average relative humidity within the SCAB is 71 percent (%) along the coast and 59% inland. Since the ocean effect is dominant, periods of heavy early morning fog are frequent and low stratus clouds are a characteristic feature. These effects decrease with distance from the coast.

More than 90% of the SCAB’s rainfall occurs from November through April. The annual average rainfall varies from approximately nine inches in Riverside to fourteen inches in downtown Los Angeles. Monthly and yearly rainfall totals are extremely variable. Summer rainfall usually consists of widely scattered thunderstorms near the coast and slightly heavier shower activity in the eastern portion of the SCAB with frequency being higher near the coast.

Due to its generally clear weather, about three-quarters of available sunshine is received in the SCAB.

The remaining one-quarter is absorbed by clouds. The ultraviolet portion of this abundant radiation

Page 644 of 9818 ends

16463-03 AQ & GHG Assessment 4 6th Street
is a key factor in photochemical reactions. On the shortest day of the year there are approximately 10 hours of possible sunshine, and on the longest day of the year there are approximately 14½ hours of possible sunshine.

The importance of wind to air pollution is considerable. The direction and speed of the wind determines the horizontal dispersion and transport of the air pollutants. During the late autumn to early spring rainy season, the SCAB is subjected to wind flows associated with the traveling storms moving through the region from the northwest. This period also brings five to ten periods of strong, dry offshore winds, locally termed “Santa Anas” each year. During the dry season, which coincides with the months of maximum photochemical smog concentrations, the wind flow is bimodal, typified by a daytime onshore sea breeze and a nighttime offshore drainage wind. Summer wind flows are created by the pressure differences between the relatively cold ocean and the unevenly heated and cooled land surfaces that modify the general northwesterly wind circulation over southern California. Nighttime drainage begins with the radiational cooling of the mountain slopes.

Heavy, cool air descends the slopes and flows through the mountain passes and canyons as it follows the lowering terrain toward the ocean. Another characteristic wind regime in the SCAB is the “Catalina Eddy,” a low level cyclonic (counterclockwise) flow centered over Santa Catalina Island which results in an offshore flow to the southwest. On most spring and summer days, some indication of an eddy is apparent in coastal sections.

In the SCAB, there are two distinct temperature inversion structures that control vertical mixing of air pollution. During the summer, warm high-pressure descending (subsiding) air is undercut by a shallow layer of cool marine air. The boundary between these two layers of air is a persistent marine subsidence/inversion. This boundary prevents vertical mixing which effectively acts as an impervious lid to pollutants over the entire SCAB. The mixing height for the inversion structure is normally situated 1,000 to 1,500 feet above mean sea level.

A second inversion-type forms in conjunction with the drainage of cool air off the surrounding mountains at night followed by the seaward drift of this pool of cool air. The top of this layer forms a sharp boundary with the warmer air aloft and creates nocturnal radiation inversions. These inversions occur primarily in the winter when nights are longer and onshore flow is weakest. They are typically only a few hundred feet above mean sea level. These inversions effectively trap pollutants, such as nitrogen oxides (NOX) and carbon monoxide (CO) from vehicles, as the pool of cool air drifts seaward. Winter is therefore a period of high levels of primary pollutants along the coastline.

Wind Patterns and Project Location
The distinctive climate of the Project area and the SCAB is determined by its terrain and geographical location. The SCAB is located in a coastal plain with connecting broad valleys and low hills, bounded by the Pacific Ocean in the southwest quadrant with high mountains forming the remainder of the perimeter.

Wind patterns across the south coastal region are characterized by westerly and southwesterly onshore winds during the day and easterly or northeasterly breezes at night. Winds are characteristically light although the speed is somewhat greater during the dry summer months than during the rainy winter season.

Page 645 of 9818 ends

16463-03 AQ & GHG Assessment 5 6th Street
Criteria Pollutants
Both the U.S. Environmental Protection Agency (EPA) and the California Air Resources Board (CARB) have established ambient air quality standards for common pollutants. These ambient air quality standards are levels of contaminants representing safe levels that avoid specific adverse health effects associated with each pollutant. The ambient air quality standards cover what are called “criteria” pollutants because the health and other effects of each pollutant are described in criteria documents. The six criteria pollutants are ozone (O3) (precursor emissions include NOX and reactive organic gases (ROG), CO, particulate matter (PM), nitrogen dioxide (NO2), sulfur dioxide (SO2), and lead. Areas that meet ambient air quality standards are classified as attainment areas, while areas that do not meet these standards are classified as nonattainment areas. The Riverside County portion of the SCAB is designated as a nonattainment area for the federal O3 and PM2.5 standards and is also a nonattainment area for the state standards for O3, PM10, and PM2.5.

Toxic Air Contaminants (TAC) Trend
In 1984, as a result of public concern for exposure to airborne carcinogens, CARB adopted regulations to reduce the amount of TAC emissions resulting from mobile and area sources, such as cars, trucks, stationary products, and consumer products. According to the Ambient and Emission Trends of Toxic Air Contaminants in California journal article (2) which was prepared for CARB, results show that between 1990-2012, ambient concentration and emission trends for the seven TACs responsible for most of the known cancer risk associated with airborne exposure in California have declined significantly (between 1990 and 2012). The seven TACs studied include those that are derived from mobile sources: diesel particulate matter (DPM), benzene (C6H6), and 1,3-butadiene (C4H6); those that are derived from stationary sources: perchloroethylene (C2Cl4) and hexavalent chromium (Cr(VI)); and those derived from photochemical reactions of emitted VOCs: formaldehyde (CH2O) and acetaldehyde (C2H4O).
1 The decline in ambient concentration and emission trends of these TACs are a result of various regulations CARB has implemented to address cancer risk.

REGULATORY BACKGROUND

FEDERAL REGULATIONS
The EPA is responsible for setting and enforcing the national ambient air quality standards (NAAQS) for O3, CO, NOX, SO2, PM10, and lead (Pb) (3). The EPA has jurisdiction over emissions sources that are under the authority of the federal government including aircraft, locomotives, and emissions sources outside state waters (Outer Continental Shelf). The EPA also establishes emission standards for vehicles sold in states other than California. Automobiles sold in California must meet the stricter emission requirements of CARB.

The Federal Clean Air Act (CAA) was first enacted in 1955 and has been amended numerous times in subsequent years (1963, 1965, 1967, 1970, 1977, and 1990). The CAA establishes the federal air quality standards, the NAAQS, and specifies future dates for achieving compliance (4). The CAA also mandates that each state submit and implement state implementation plans (SIPs) for local areas 1 It should be noted that ambient DPM concentrations are not measured directly. Rather, a surrogate method using the coefficient of haze (COH) and elemental carbon (EC) is used to estimate DPM concentrations.

Page 646 of 9818 ends

16463-03 AQ & GHG Assessment 6 6th Street
not meeting these standards. These plans must include pollution control measures that demonstrate how the standards will be met.

The 1990 amendments to the CAA that identify specific emission reduction goals for areas not meeting the NAAQS require a demonstration of reasonable further progress toward attainment and incorporate additional sanctions for failure to attain or to meet interim milestones. The sections of the CAA most directly applicable to the development of the Project site include Title I (Non-Attainment Provisions) and Title II (Mobile Source Provisions) (5) (6). Title I provisions were established with the goal of attaining the NAAQS for the following criteria pollutants O3, NO2, SO2, PM10, CO, PM2.5, and Pb. The NAAQS were amended in July 1997 to include an additional standard for O3 and to adopt a NAAQS for PM2.5.

Mobile source emissions are regulated in accordance with Title II provisions. These provisions require the use of cleaner burning gasoline and other cleaner burning fuels such as methanol and natural gas. Automobile manufacturers are also required to reduce tailpipe emissions of hydrocarbons and NOX. NOX is a collective term that includes all forms of NOX which are emitted as byproducts of the combustion process.

CALIFORNIA REGULATIONS
CARB
The CARB, which became part of the California EPA (CalEPA) in 1991, is responsible for ensuring implementation of the California Clean Air Act (AB 2595), responding to the federal CAA, and for regulating emissions from consumer products and motor vehicles. AB 2595 mandates achievement of the maximum degree of emissions reductions possible from vehicular and other mobile sources in order to attain the state ambient air quality standards by the earliest practical date. The CARB established the California ambient air quality standards (CAAQS) for all pollutants for which the federal government has NAAQS and, in addition, establishes standards for SO4, visibility, hydrogen sulfide (H2S), and vinyl chloride (C2H3Cl). However, at this time, H2S and C2H3Cl are not measured at any monitoring stations in the SCAB because they are not considered to be a regional air quality problem. Generally, the CAAQS are more stringent than the NAAQS (7) (8).

Local air quality management districts, such as the SCAQMD, regulate air emissions from stationary sources such as commercial and industrial facilities. All air pollution control districts have been formally designated as attainment or non-attainment for each CAAQS.

Serious non-attainment areas are required to prepare Air Quality Management Plans (AQMP) that include specified emission reduction strategies in an effort to meet clean air goals. These plans are required to include:
• Application of Best Available Retrofit Control Technology to existing sources; • Developing control programs for area sources (e.g., architectural coatings and solvents) and indirect sources (e.g., motor vehicle use generated by residential and commercial development); • A District permitting system designed to allow no net increase in emissions from any new or modified permitted sources of emissions;
• Implementing reasonably available transportation control measures and assuring a substantial reduction in growth rate of vehicle trips and miles traveled; • Significant use of low emissions vehicles by fleet operators;

Page 647 of 9818 ends

16463-03 AQ & GHG Assessment 7 6th Street
• Sufficient control strategies to achieve a 5% or more annual reduction in emissions or 15% or more in a period of three years for ROGs, NOX, CO and PM10. However, air basins may use an alternative emission reduction strategy that achieves a reduction of less than 5% per year under certain circumstances.

AQMP
Currently, the NAAQS and CAAQS are exceeded in most parts of the SCAB. In response, the SCAQMD has adopted a series of AQMP to meet the state and federal ambient air quality standards (9). AQMPs are updated regularly in order to more effectively reduce emissions, accommodate growth, and to minimize any negative fiscal impacts of air pollution control on the economy.

APPLICABLE REGULATORY REQUIREMENTS
SCAQMD Rules that are currently applicable during construction activity for this Project include but are not limited to Rule 403 (Fugitive Dust) and Rule 1113 (Architectural Coatings) (10) (11).

SCAQMDRULE 403
This rule is intended to reduce the amount of particulate matter entrained in the ambient air as a result of anthropogenic (human-made) fugitive dust sources by requiring actions to prevent and reduce fugitive dust emissions. Rule 403 applies to any activity or human-made condition capable of generating fugitive dust and requires best available control measures to be applied to earth moving and grading activities. This rule is intended to reduce PM10 emissions from any transportation, handling, construction, or storage activity that has the potential to generate fugitive dust. PM10 suppression techniques are summarized below.
• Portions of a construction site to remain inactive longer than a period of three months will be seeded and watered until grass cover is grown or otherwise stabilized. • All on-site roads will be paved as soon as feasible or watered periodically or chemically stabilized. • All material transported off-site will be either sufficiently watered or securely covered to prevent excessive amounts of dust.
• The area disturbed by clearing, grading, earthmoving, or excavation operations will be minimized at all times.
• Where vehicles leave a construction site and enter adjacent public streets, the streets will be swept daily or washed down at the end of the workday to remove soil tracked onto the paved surface.

SCAQMDRULE 1113
This rule serves to limit the volatile organic compound (VOC) content of architectural coatings used on projects in the SCAQMD. Any person who supplies, sells, offers for sale, or manufactures any architectural coating for use on projects in the SCAQMD must comply with the current VOC standards set in this rule.

METHODOLOGY
The California Air Pollution Control Officers Association (CAPCOA) in conjunction with other California air districts, including SCAQMD, released CalEEMod 2022 in May 2022. CalEEMod periodically releases updates, as such the latest version available at the time of this report has been

Page 648 of 9818 ends

16463-03 AQ & GHG Assessment 8 6th Street
utilized in this analysis. The purpose of this model is to calculate construction-source and operational-source criteria pollutant (VOCs, NOX, SOX, CO, PM10, and PM2.5) and GHG emissions from direct and indirect sources; and quantify applicable air quality and GHG reductions achieved from mitigation measures (12). Accordingly, the latest version of CalEEMod has been used for this Project to determine construction and operational air quality and greenhouse gas emissions.

STANDARDS OF SIGNIFICANCE
The criteria used to determine the significance of potential Project-related air quality impacts are taken from the California Environmental Quality Act Guidelines (CEQA Guidelines) (14 CCR §§15000, et seq.). Based on these thresholds, a project would result in a significant impact related to air quality if it would (13):
• Threshold 1: Conflict with or obstruct implementation of the applicable air quality plan. • Threshold 2: Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is in non-attainment under an applicable federal or state ambient air quality standard.
• Threshold 3: Expose sensitive receptors to substantial pollutant concentrations. • Threshold 4: Result in other emissions (such as those leading to odors) adversely affecting a substantial number of people.

AIR QUALITY REGIONAL AND LOCALIZED EMISSIONS THRESHOLDS The SCAQMD has developed regional and localized significance thresholds for criteria pollutants, as summarized at Tables 1 and 2 (14). The SCAQMD’s CEQA Air Quality Significance Thresholds (March 2023) indicate that any projects in the SCAB with daily emissions that exceed any of the indicated thresholds should be considered as having an individually and cumulatively significant air quality impact.

TABLE 1:REGIONAL EMISSIONS SIGNIFICANCE THRESHOLDS
Pollutant Construction Operations
NOX 100 lbs/day 55 lbs/day
VOC 75 lbs/day 55 lbs/day
PM10 150 lbs/day 150 lbs/day
PM2.5 55 lbs/day 55 lbs/day
SOX 150 lbs/day 150 lbs/day
CO 550 lbs/day 550 lbs/day
Pb 3 lbs/day 3 lbs/day
lbs/day = Pounds Per Day

Page 649 of 9818 ends

16463-03 AQ & GHG Assessment 9 6th Street
TABLE 2: LOCALIZED EMISSIONS SIGNIFICANCE THRESHOLDS
Pollutant Construction Operations
NOX 0.18 ppm 0.18 ppm
CO (1-hour average) 20 ppm 20 ppm
CO (8-hour average) 9 ppm 9 ppm
PM10 10.4 µg/m3 2.5 µg/m3
PM2.5 10.4 µg/m3 2.5 µg/m3
ppm = Parts Per Million
µg/m3 = Micrograms Per Cubic Meter

CONSTRUCTION ACTIVITIES
Construction activities associated with the Project would result in emissions of VOCs, NOX, SOX, CO, PM10, and PM2.5. Construction related emissions are expected from the following construction activities:
• Demolition
• Site Preparation
• Grading
• Building Construction
• Paving
• Architectural Coating

DEMOLITION ACTIVITIES
The Project site is currently developed with 6 existing single-story light industrial warehouse buildings and the foundation material of a 7th building that will be demolished. Based on information provided by the client, the total volume of demolition debris includes 6,000 CY of concrete (walls and foundation), 1,056 CY of asphalt, and 950 tons of trash. For modeling purposes, a total of approximately 10,828.4 tons of debris has been assumed. Additionally, based on information provided by the client, demolition material will be hauled off-site to the El Sobrante Landfill, located 43 miles from the Project site. As such, a trip length of 43-miles was used to analyze the emissions associated with demolition activities.

GRADING ACTIVITIES
Dust is typically a major concern during grading activities. Because such emissions are not amenable to collection and discharge through a controlled source, they are called “fugitive emissions.” Fugitive dust emissions rates vary as a function of many parameters (soil silt, soil moisture, wind speed, area disturbed, number of vehicles, depth of disturbance or excavation, etc.). CalEEMod was utilized to calculate fugitive dust emissions resulting from this phase of activity.The Project would require 680 cubic yards of soil export. Based on information provided by the client, grading materials will be hauled off-site to the El Sobrante Landfill, located 43 miles from the Project site. As such, a trip length of 43-miles was used to analyze the emissions associated with export activities.

Page 650 of 9818 ends

16463-03 AQ & GHG Assessment 10 6th Street

OFF-SITE UTILITY AND INFRASTRUCTURE IMPROVEMENTS
To support the Project development, there will be off-site improvements associated along 6th Street and Valley Boulevard project frontage. On 6th Street, improvements will relocate the southwesterly driveway further southwest, install one new public fire hydrant south of the relocated driveway, construct a new sidewalk along the entire length of frontage, install approximately 3 new streetlights, underground the existing high voltage transmission lines and remove the poles, and remove adjacent trees to increase curb radius at the intersection with Valley Boulevard. On Valley Boulevard, improvements will close the northwesterly driveway, relocate the southeasterly driveway, relocate one existing streetlight, and install one new public fire hydrant north of the relocated driveway. The off-site construction activities would not take place at one location for the entire duration of construction. Impacts associated with these activities are not expected to exceed the emissions identified for Project-related construction activities since the off-site construction areas would have physical constraints such as, roadway travel lanes, traffic signals, and sidewalks which would limit the amount of daily activity that could occur. The physical constraints would limit the amount of construction equipment that could be used, and any off-site and utility infrastructure construction would not use equipment totals that would exceed the equipment totals. On the basis of the previous discussion, no impacts beyond what has already been identified in this report are expected to occur.

ON-ROAD TRIPS
Construction generates on-road vehicle emissions from vehicle usage for workers, vendors, and haul trucks commuting to and from the site. The number of worker, vendor, and hauling trips per phase is presented below in Table 3.Worker and hauling trips are based on CalEEMod defaults. It should be noted that for vendor trips, specifically, CalEEMod only assigns vendor trips to the Building Construction phase. Vendor trips would likely occur during all phases of construction. As such, the CalEEMod defaults for vendor trips have been adjusted based on a ratio of the total vendor trips to the number of days of each subphase of activity.

TABLE 3:CONSTRUCTION TRIP ASSUMPTIONS
Construction Activity Worker Trips
Per Day
Vendor Trips
Per Day
Hauling Trips
Per Day
Demolition 15 2 159
Site Preparation 18 1 0
Grading 15 2 5
Building Construction 59 19 0
Paving 20 0 0
Architectural Coating 12 0 0

CONSTRUCTION DURATION
For purposes of analysis, construction of Project is expected to commence in March 2026 and would last through January 2027. The construction schedule utilized in the analysis, as shown in Table 4, represents a “worst-case” analysis scenario should construction occur any time after the respective dates since emission factors for construction decrease as time passes and the analysis year increases

Page 651 of 9818 ends

16463-03 AQ & GHG Assessment 11 6th Street
due to emission regulations becoming more stringent2. The duration of construction activity and associated equipment represents a reasonable approximation of the expected construction fleet as required per CEQA Guidelines (15).

TABLE 4:CONSTRUCTION DURATION
Construction Activity Start Date End Date Days
Demolition 3/2/2026 3/24/2026 17
Site Preparation 3/25/2026 4/6/2026 9
Grading 4/7/2026 4/29/2026 17
Building Construction 4/30/2026 1/28/2027 196
Paving 1/6/2027 1/28/2027 17
Architectural Coating 1/6/2027 1/28/2027 17

CONSTRUCTION EQUIPMENT
Equipment used for construction of the Project is shown in Table 5. CalEEMod default parameters for equipment has been used. Consistent with industry standards and typical construction practices, each piece of equipment will operate up to a total of eight (8) hours per day, or more than two-thirds of the period during which construction activities are allowed pursuant to the code.

TABLE 5:CONSTRUCTION EQUIPMENT
Construction Activity Equipment1 Quantity Hours
Concrete/Industrial Saws 1 8
Demolition Excavators 3 8
Rubber Tired Dozers 2 8
Site Preparation
Rubber Tired Dozers 3 8
Crawler Tractors 4 8
Grading
Excavators 1 8
Graders 1 8
Rubber Tired Dozers 1 8
Crawler Tractors 3 8
Building Construction
Cranes 1 8
Forklifts 3 8
Generator Sets 1 8
Tractors/Loaders/Backhoes 3 8
Welders 1 8
2 As shown in the CalEEMod User’s Guide Version 2022, Appendix G “Table G-11. Statewide Average Annual Offroad Equipment Emission Factors” as the analysis year increases, emission factors for the same equipment pieces decrease due to the natural turnover of older equipment being replaced by newer less polluting equipment and new regulatory requirements.

Page 652 of 9818 ends

16463-03 AQ & GHG Assessment 12 6th Street
Construction Activity Equipment1 Quantity Hours
Paving
Pavers 1 8
Paving Equipment 2 8
Rollers 2 8
Tractors/Loaders/Backhoes 1 8
Cement and Mortar Mixers 2 8
Architectural Coating Air Compressors 1 8
1 In order to account for fugitive dust emissions, Crawler Tractors were used in lieu of Tractors/Loaders/Backhoes.

REGIONAL CONSTRUCTION EMISSIONS SUMMARY
The estimated maximum daily construction emissions without mitigation are summarized in Table

6. Detailed construction model outputs are presented in Appendix 1. Under the assumed scenarios, emissions resulting from the Project construction will not exceed thresholds established by the SCAQMD for emissions of any criteria pollutant and no mitigation is required.

TABLE 6:REGIONAL CONSTRUCTION EMISSIONS SUMMARY
Year Emissions (lbs/day)
ROG NOX CO SO2 PM10T PM2.5T
Summer
2026 3.90 34.72 32.15 0.05 7.67 4.37
Winter
2026 3.90 34.73 31.99 0.11 7.67 4.37
2027 43.58 19.62 30.91 0.05 2.03 0.95
Maximum Daily Emissions 43.58 34.73 32.15 0.11 7.67 4.37 SCAQMD Regional Thresholds 75 100 550 150 150 55
Threshold Exceeded? NO NO NO NO NO NO
1 PM10 and PM2.5 source emissions reflect 3x daily watering per SCAQMD Rule 403 for fugitive dust. 2VOC source emissions reflect SCAQMD Rule 1113 for Architectural Coatings.

REGIONAL OPERATIONAL EMISSIONS
Proposed Project
Operational activities associated with the Project would result in emissions of CO, VOCs, NOX, SOX, PM10, and PM2.5. Operational related emissions are expected from the following primary sources:
area source emissions, mobile source emissions, stationary source emissions, and cargo handling equipment emissions.

The proposed Project related operational air quality impacts derive primarily from vehicle trips generated by the Project. Trip generation statistics published in the Institute of Transportation Engineers (ITE) Trip Generation Manual (11th Edition, 2021) for the Warehousing (ITE Land Use Code 150) land use category were utilized in this analysis (16).

To determine emissions from trucks for the proposed industrial uses, the analysis incorporated the SCAQMD recommended truck trip length 15.3 miles for 2-axle (LHDT1, LHDT2) trucks, 14.2 miles 3-

I I I I I I

Page 653 of 9818 ends

16463-03 AQ & GHG Assessment 13 6th Street
axle (MHDT) trucks and 39.9 miles for 4+-axle (HHDT) trucks and weighting the average trip lengths using the following SCAQMD recommended truck mix: 2-Axle = 16.7%; 3-Axle = 20.7%; 4+-Axle =

62.6%. The trip length function for trucks in CalEEMod has been revised to 30.47 miles, with an assumption of 100% primary trips for the proposed industrial land uses.

It is anticipated that the Project will utilize a 300 hp diesel-powered fire pump and 700 hp emergency generator. For analytical purposes, it is anticipated that the fire pump and generator would operate for a maximum time of 1 hour per day and 50 hours per year for maintenance and testing purposes.

It is common for warehouse buildings to require the operation of exterior yard trucks or cargo handling equipment (CHE) to move empty containers and empty chassis in the building’s truck court areas.The cargo handling equipment is assumed to have a horsepower (hp) range of approximately 175 hp to 200 hp. Based on the latest available information from SCAQMD (17); for example, warehouse projects typically have 3.6-yard trucks/CHE per million square feet of building space. For this Project, on-site modeled operational equipment conservatively includes up to one (1) 175 horsepower (hp), compressed natural gas or gasoline-powered tractors/loaders/backhoes operating at 4 hours a day3 for 365 days of the year.

The estimated operation-source emissions from the Project are summarized in Table 7. Detailed operation model outputs are presented in Appendix 1. As shown in Table 7, operational-source emissions would not exceed the applicable SCAQMD regional thresholds for emissions of any criteria pollutant.

TABLE 7: TOTAL PROJECT REGIONAL OPERATIONAL EMISSIONS
Source Emissions (lbs/day)
ROG NOX CO SO2 PM10T PM2.5T
Summer
Mobile 0.65 7.39 8.17 0.08 3.53 1.00
Area 4.22 0.05 6.12 0.00 0.01 0.01
Stationary 1.64 4.59 4.18 0.01 0.24 0.24
Cargo Handling Equipment 0.12 0.38 16.44 0.00 0.03 0.03 Maximum Daily Emissions 6.63 12.41 34.91 0.09 3.81 1.28 SCAQMD Regional Thresholds 55 55 550 150 150 55
Threshold Exceeded? NO NO NO NO NO NO
Winter
Mobile 0.64 7.71 7.71 0.08 3.53 1.00
Area 3.21 0.00 0.00 0.00 0.00 0.00
Stationary 1.64 4.59 4.18 0.01 0.24 0.24
Cargo Handling Equipment 0.12 0.38 16.44 0.00 0.03 0.03 Maximum Daily Emissions 5.61 12.68 28.34 0.08 3.80 1.27 SCAQMD Regional Thresholds 55 55 550 150 150 55
Threshold Exceeded? NO NO NO NO NO NO
3 Based on Table II-3, Port and Rail Cargo Handling Equipment Demographics by Type, from CARB’s Technology Assessment: Mobile Cargo Handling Equipment document, a single piece of equipment could operate up to 2 hours per day (Total Average Annual Activity divided by Total Number Pieces of Equipment). As such, the analysis conservatively assumes that the tractor/loader/backhoes would operate up to 4 hours per day.

Page 654 of 9818 ends

16463-03 AQ & GHG Assessment 14 6th Street
Existing Buildings
The Project site is currently developed with 6 existing single-story light industrial warehouse buildings totaling 199,480 square feet. The estimated operation-source emissions from the existing buildings are summarized in Table 8. Detailed operation model outputs are presented in Appendix 2.

The existing buildings related operational air quality impacts derive primarily from vehicle trips generated by the existing uses.Trip generation statistics published in the Institute of Transportation Engineers (ITE) Trip Generation Manual (11th Edition, 2021) for the Warehousing (ITE Land Use Code 150) land use category were utilized in this analysis (16).

To determine emissions from trucks for the existing industrial uses, the analysis incorporated the SCAQMD recommended truck trip length 15.3 miles for 2-axle (LHDT1, LHDT2) trucks, 14.2 miles 3- axle (MHDT) trucks and 39.9 miles for 4+-axle (HHDT) trucks and weighting the average trip lengths using the following SCAQMD recommended truck mix: 2-Axle = 16.7%; 3-Axle = 20.7%; 4+-Axle =

62.6%. The trip length function for trucks in CalEEMod has been revised to 30.47 miles, with an assumption of 100% primary trips for the existing industrial land uses.

TABLE 8: EXISTING BUILDINGS REGIONAL OPERATIONAL EMISSIONS Source Emissions (lbs/day)
ROG NOX CO SO2 PM10T PM2.5T
Summer
Mobile 1.01 11.56 12.83 0.11 5.01 1.42
Area 6.21 0.07 8.67 0.00 0.02 0.01
Energy 0.06 1.03 0.87 0.01 0.08 0.08
Maximum Daily Emissions 7.28 12.67 22.38 0.12 5.10 1.51 Winter
Mobile 1.00 12.06 12.11 0.11 5.01 1.42
Area 4.79 0.00 0.00 0.00 0.00 0.00
Energy 0.06 1.03 0.87 0.01 0.08 0.08
Maximum Daily Emissions 5.84 13.10 12.98 0.12 5.09 1.50 Project Net New Operational Emissions – Comparison to Existing Buildings As shown in Table 9, the proposed Project is anticipated to generate less emissions per day for pollutants of VOC, NOX, SOX, PM10, and PM2.5 and more emissions per day for CO as compared to emissions generated by the existing buildings. Additionally, the proposed Projects would still emit less emissions than the applicable thresholds.

Page 655 of 9818 ends

16463-03 AQ & GHG Assessment 15 6th Street
TABLE 9: PROJECT NET NEW REGIONAL OPERATIONAL EMISSIONS Source Emissions (lbs/day)
ROG NOX CO SO2 PM10T PM2.5T
Summer
Proposed Project 6.63 12.41 34.91 0.09 3.81 1.28
Existing Buildings 7.28 12.67 22.38 0.12 5.10 1.51
Net Emissions (Proposed –
Existing) -0.65 -0.26 12.54 -0.04 -1.29 -0.24
SCAQMD Regional Threshold 55 55 550 150 150 55
Threshold Exceeded? NO NO NO NO NO NO
Winter
Proposed Project 5.61 12.68 28.34 0.08 3.80 1.27
Existing Buildings 5.84 13.10 12.98 0.12 5.09 1.50
Net Emissions (Proposed –
Existing) -0.23 -0.42 15.36 -0.03 -1.29 -0.23
SCAQMD Regional Threshold 55 55 550 150 150 55
Threshold Exceeded? NO NO NO NO NO NO

LOCALIZED CONSTRUCTION EMISSIONS
The analysis makes use of methodology included in the SCAQMD Final Localized Significance Threshold Methodology (LST Methodology). The SCAQMD has established that impacts to air quality are significant if there is a potential to contribute or cause localized exceedances of the federal and/or state ambient air quality standards (NAAQS/CAAQS). Collectively, these are referred to as Localized Significance Thresholds (LSTs).

The SCAQMD established LSTs in response to the SCAQMD Governing Board’s Environmental Justice Initiative I-4.4 LSTs represent the maximum emissions from a project that would not cause or contribute to an exceedance of the most stringent applicable federal or state ambient air quality standard at the nearest residence or sensitive receptor. The SCAQMD states that lead agencies can use the LSTs as another indicator of significance in its air quality impact analyses.

LSTs were developed in response to environmental justice and health concerns raised by the public regarding exposure of individuals to criteria pollutants in local communities. To address the issue of localized significance, the SCAQMD adopted LSTs that show whether a project would cause or contribute to localized air quality impacts and thereby cause or contribute to potential localized adverse health effects. The analysis makes use of methodology included in the LST Methodology (18).

Emissions Considered
Based on SCAQMD’s LST Methodology, emissions for concern during construction activities are on-site NOX, CO, PM2.5, and PM10. The LST Methodology clearly states that “off-site mobile emissions 4 The purpose of SCAQMD’s Environmental Justice program is to ensure that everyone has the right to equal protection from air pollution and fair access to the decision-making process that works to improve the quality of air within their communities. Further, the SCAQMD defines Environmental Justice as “…equitable environmental policymaking and enforcement to protect the health of all residents, regardless of age, culture, ethnicity, gender, race, socioeconomic status, or geographic location, from the health effects of air pollution.”

Page 656 of 9818 ends

16463-03 AQ & GHG Assessment 16 6th Street
from the Project should not be included in the emissions compared to LSTs (19).” As such, for purposes of the construction LST analysis, only emissions included in the CalEEMod “on-site” emissions outputs were considered.

Dispersion Modeling
In order to estimate localized pollutant concentrations resulting from Project construction, the SCAQMD-approved American Meteorological Society/EPA Regulatory Model (AERMOD) dispersion model was utilized. The modeling approach utilized is discussed as follows.

Sources
It should be noted that in order to model worst-case conditions, the highest daily peak on-site emissions resulting from overlapping construction activity were modeled. A ground level release height and a 1 meter (approximately 3.28 feet) initial vertical dimension (sigma z) were utilized for fugitive dust emissions of PM10 and PM2.5 consistent with SCAQMD’s LST guidance. In order to account for equipment exhaust emissions from NO2, CO, PM10, and PM2.5 a release height of 5.0 meters was utilized consistent with SCAQMD’s LST guidance.

Meteorological Data and Model Options
In order to account for meteorological conditions at the Project site, meteorological data from the SCAQMD’s PICO monitoring station was utilized, as this is the nearest station to the Project site for which meteorological data is available. Additionally, a receptor height of 2 meters and regulatory default options were utilized consistent with SCAQMD’s LST guidance.

Receptors
As previously stated, LSTs represent the maximum emissions from a project that would not cause or contribute to an exceedance of the most stringent applicable NAAQS and CAAQS at the nearest residence or sensitive receptor. Receptor locations are off-site locations where individuals may be exposed to emissions from Project activities. Some people are especially sensitive to air pollution and are given special consideration when evaluating air quality impacts from projects. These groups of people include children, the elderly, and individuals with pre-existing respiratory or cardiovascular illness. Structures that house these persons or places where they gather are defined as “sensitive receptors”. These structures typically include uses such as residences, hotels, and hospitals where an individual can remain for 24 hours. Consistent with the LST Methodology, the nearest land use to the Project site where an individual could remain for 24 hours has been used to determine construction and operational air quality impacts for emissions of PM10 and PM2.5, since PM10 and PM2.5 thresholds are based on a 24-hour averaging time.

Per the LST Methodology, commercial and industrial facilities are not included in the definition of sensitive receptor because employees and patrons do not typically remain onsite for a full 24 hours but are typically on-site for 8 hours or less. However, LST Methodology explicitly states that “LSTs based on shorter averaging periods, such as the NO2 and CO LSTs, could also be applied to receptors such as industrial or commercial facilities since it is reasonable to assume that a worker at these sites could be present for periods of one to eight hours (19).” Therefore, any adjacent land use where an individual could remain for 1 or 8 hours, that is located at a closer distance to the Project site than the receptor used for PM10 and PM2.5 analysis, must be considered to determine construction and