UPDATED DRAFT GEOTECHNICAL INVESTIGATION REPORT

CUDAHY PARK RENOVATIONS

CUDAHY, CALIFORNIA
Prepared for
The City of Cudahy
5220 Santa Ana Street
Cudahy, CA 90201
Prepared by
Willdan Engineering
1515 South Sunkist Street, Suite E
Anaheim, California 92806
Willdan Project No. 112093-4000
September 27, 2024
Cudahy Park Renovation Project, Project # PRE-001 Document Control 122 of 1214 Page 152 of 1692 Engineering | Geotechnical | Environmental | Sustainability | Financial | Homeland Security Phone: 657.554.8919 | Fax: 714.634.3372 | 1515 South Sunkist Street, Suite E, Anaheim, CA 92806 | www.willdan.com September 27, 2024

The City of Cudahy
5220 Santa Ana Street
Cudahy, CA 90201
Subject: Updated Draft Geotechnical Investigation Report Cudahy Park Renovations, Cudahy, California
Willdan Project No. 112093-4000
Dear John,
Willdan Engineering (Willdan) is pleased to submit this updated draft geotechnical investigation report for the proposed Cudahy Park Renovations Project (Project) in the City of Cudahy, California. This report is updated per Willdan’s Conceptual Site Plan dated May 13, 2024 provided by your team.

It is a pleasure to be of service to you on this project. Should you have any questions regarding the contents of this report or require additional information, please contact us.

Respectfully submitted,

WILLDAN ENGINEERING
Chien-Chang Chen, P.E., G.E.

Supervising Engineering
Distribution: Addressee
Cudahy Park Renovation Project, Project # PRE-001 Document Control 123 of 1214 Page 153 of 1692 Updated Draft Geotechnical Investigation Report
Cudahy Park Renovations
Cudahy, California
Willdan Project No. 112093-4000
September 27, 2024
i

TABLE OF CONTENTS

SECTION PAGE

1.0 INTRODUCTION ................................................................................................................1

2.0 SCOPE OF SERVICES .......................................................................................................1

3.0 SITE DESCRIPTION AND PROPOSED DEVELOPMENT .........................................2

4.0 GEOLOGIC CONDITIONS ...............................................................................................2

4.1 Review of Regional Database and Previous Studies ...............................................2

4.2 Geological Setting ....................................................................................................2

4.3 Local Geology ..........................................................................................................3

4.4 Regional and Local Faults .......................................................................................3

5.0 GEOTECHNICAL INVESTIGATIONS ...........................................................................4

5.1 Field Exploration .....................................................................................................4

5.2 Laboratory Testing ...................................................................................................4

5.3 Subsurface Conditions .............................................................................................5

5.4 Groundwater ............................................................................................................5

6.0 SEISMIC HAZARDS ..........................................................................................................5

6.1 Site Characterization – Site Class ............................................................................5

6.2 Ground Shaking .......................................................................................................5

6.3 Soil Liquefaction ......................................................................................................5

6.4 Surface Fault Rapture ..............................................................................................7

6.5 Lateral Spreading .....................................................................................................7

7.0 CONCLUSIONS AND RECOMMENDATIONS .............................................................7

7.1 General .....................................................................................................................7

7.2 Earthwork .................................................................................................................8

7.3 Seismic Design Parameters ....................................................................................10

7.4 Foundation Design .................................................................................................10

7.5 Concrete Slab-On-Grade ........................................................................................12

7.6 Soil Corrosivity ......................................................................................................12

7.7 Expansion Potential ...............................................................................................12

7.8 Infiltration Testing .................................................................................................12

7.9 Review of Construction Plans ................................................................................13

7.10 Geotechnical Observation and Testing ..................................................................13

8.0 CLOSURE ...........................................................................................................................14

9.0 REFERENCES ...................................................................................................................15

LIST OF FIGURES
Figure 1 – Vicinity Map
Figure 2 – Regional Geologic Map
Figure 3 – Boring Locations Map
Cudahy Park Renovation Project, Project # PRE-001 Document Control 124 of 1214 Page 154 of 1692 Updated Draft Geotechnical Investigation Report
Cudahy Park Renovations
Cudahy, California
Willdan Project No. 112093-4000
September 27, 2024
ii

LIST OF TABLES
Table 1 Nearby Faults 4
Table 2 Seismic Design Factors per ASCE 7-16 10
Table 3 Infiltration Test Results 13

APPENDICES
APPENDIX A. BORING LOGS
APPENDIX B. LABORATORY TEST RESULTS
APPENDIX C. SEISMIC DESIGN PARAMETERS PER ASCE 7-16 & 7-22 APPENDIX D. PERCOLATION TEST RESULTS
Cudahy Park Renovation Project, Project # PRE-001 Document Control 125 of 1214 Page 155 of 1692 Updated Draft Geotechnical Investigation Report
Cudahy Park Renovations
Cudahy, California
Willdan Project No. 112093-4000
September 27, 2024
1 1.0 INTRODUCTION
This report presents the results of our geotechnical engineering investigation performed for the proposed Project in the City of Cudahy (City), California. The Vicinity Map, Figure 1, shows the site location.

The Project involves in design and construction of a new performing arts stage, outdoor gym with exercise stations and shade, walking loop/jogging path, splash pad with shade, shaded picnic shelter, and shaded picnic area, and new lighting and landscaping throughout the park. It will renovate four basketball courts, a baseball field with shade structures, playground, skate park, and tennis court as well. This report includes our geotechnical findings, and recommendations as a basis for the design and construction of the Project. The recommendations provided within this submittal are based on the results of our limited field exploration, laboratory testing, and engineering analyses.

2.0 SCOPE OF SERVICES
Our services evaluated the geotechnical conditions at the site and provided geotechnical design recommendations for the Project. Our scope of services included the following:
 A site reconnaissance by a member of our engineering staff to evaluate the present conditions at the project location;
 Review of selected published geologic maps and reports pertinent to the site and surrounding area;
 Field investigation consisting of drilling two (2) hollow stem auger boring holes for soil exploration to a depth of 20 feet below the existing ground surface (bgs) each and one boring for conducting one (1) percolation test to a depth of 5 feet bgs on the aforementioned locations;
 Laboratory testing on the pertinent samples obtained from the borings and interpretation of the test results to determine the physical and engineering properties of the subsurface soils;  Composite soil testing on the soil cuttings retrieved during field drilling and disposal of the soil cuttings per CA State Regulations;
 Engineering analyses and evaluation of the data obtained from the field investigation and laboratory testing program; and
 Preparation of this report, presenting our findings, conclusions, and recommendations for design and construction of the Project from a geotechnical viewpoint.

Environmental assessment services, such as chemical analysis of soil and groundwater for hazardous substances, were not included in our scope of services. Geotechnical services related to Cudahy Park Renovation Project, Project # PRE-001 Document Control 126 of 1214 Page 156 of 1692 Updated Draft Geotechnical Investigation Report
Cudahy Park Renovations
Cudahy, California
Willdan Project No. 112093-4000
September 27, 2024
2 soil corrosivity have been limited to screening two representative soil samples collected from within the near-surface zone.

3.0 SITE DESCRIPTION AND PROPOSED DEVELOPMENT
The proposed Project is located at Cudahy Park at Santa Ana St in the City of Cudahy, California.

Primary access to the site is Santa Ana St to the west of the park and public parking is available on the north side of the park. The elevation of the site is approximately between 111 feet and 114 feet above mean sea level (MSL). The Project is proposed to renovate four basketball courts, a baseball field with shade structures, a playground, skate park, and tennis court as well. The latitude and longitude at the approximate center of the project site are 33.9587 N and 118.1736 W, respectively.

4.0 GEOLOGIC CONDITIONS

4.1 REVIEW OF REGIONAL DATABASE AND PREVIOUS STUDIES
Review of the CDMG Seismic Hazard Zone Report for the project area (CDMG, 1998, South Gate Quadrangle), indicates that historically high groundwater in the vicinity of the project site may have been within 8 feet of ground surface. The project area is in a liquefaction hazard zone as mapped by the CGS.

Review of previous reports available online at the California Geotracker Database indicates that previous borings advanced about ¼- to ½-mile west of the project site encountered primarily silty sand to sandy soils in the upper 25 feet with primarily sandy soils with interlayered clay lenses from 25 to 75 feet. Borings reviewed on the GeoTracker database from about 1995 to 2010 reported groundwater at a depth of about 50 to 55 feet.

4.2 GEOLOGICAL SETTING
The project site is in Cudahy along the western side of the north-south trending Los Angeles River (LAR) channel about 13 miles north of the Pacific Ocean. The topography in the study area slopes gently southward, generally parallel to the LAR channel.

The present-day Los Angeles Basin is a northwest-trending alluvial plain about 50 miles long and 20 miles wide, on the coast of Southern California, bounded on the north by the Santa Monica Mountains and the Elysian, Repetto, and Puente Hills and on the east and southeast by the Santa Ana Mountains and San Joaquin Hills. The low land surface slopes gently south or seaward, interrupted by the Coyote Hills near the northeast margin, a line of elongated low hills to the south and west that extend from Newport Bay northwest to Beverly Hills, and by the Palos Verdes peninsula along the southwestern extremity.

Structurally, Norris and Webb (1990) indicate the Los Angeles Basin is divided into four major blocks comprising a complex assemblage of uplifted blocks and lowered depressions. The physiographic basin is underlain by a structural depression, parts of which have been the sites of Cudahy Park Renovation Project, Project # PRE-001 Document Control 127 of 1214 Page 157 of 1692 Updated Draft Geotechnical Investigation Report
Cudahy Park Renovations
Cudahy, California
Willdan Project No. 112093-4000
September 27, 2024
3 discontinuous deposition since Late Cretaceous time and of continuous subsidence and chiefly marine deposition since middle Miocene time. The most distinctive geologic characteristic of the Los Angeles Basin is its structural relief and complexity in relation to its age and size. Continuous subsidence and deposition in late Miocene and Pliocene time caused variations in lithology and thickness in most of the sedimentary rock units; contemporaneous folding and faulting along with erosion resulted in numerous regional and local unconformities, disconformities, and stratigraphic discontinuities across faults. The Los Angeles Basin is one of California’s most prolific oilproducing districts in proportion to its size.

4.3 LOCAL GEOLOGY
Geologic mapping by CDMG (1999) indicates the near surface deposits in the project area consist of Younger Holocene Age (Qya2) alluvial deposits from the Los Angeles River (Figure 2 – Regional Geologic Map). CDMG describes the alluvial deposits in the project area as loose to medium dense, very coarse- to very fine- grained sand, gravel, and silt that appear to interfinger and grade laterally into each other.

4.4 REGIONAL AND LOCAL FAULTS
The project site is located in seismically active southern California and is expected to experience ground shaking from future earthquakes. Such earthquakes can occur on several active faults within the region. Jennings and Bryant (2010), the USGS, and the CDMG (1999, now California Geologic Survey, CGS) have mapped faults and identified fault activity in the region. Active and major faults mapped in the project vicinity are shown on Table 1 Nearby Faults.

The CGS defines active and potentially active faults in the Alquist-Priolo (AP) Geologic Hazard Zone Act (1994). Active and potentially active faults are defined as those that ruptured during the Holocene (10,000 to 11,000 years ago) and Quaternary (1.5 million years ago) periods, respectively. The CGS has published maps of Earthquake Fault Zones following the AP Geologic Hazard Zone Act, 1994, which regulates developments near active faults. Based on our review of these maps, the site does not lie within an AP Zone. However, the seismic risk is considered relatively high because of the proximity to active faulting. The closest mapped active faults by the California Geologic Survey (that are exposed at the ground surface) relative to the project site are the Newport-Inglewood and Whitter faults, located approximately 6.7 and 7.6 miles south and northeast of the project site, respectively. The other faults listed in Table 1 consist of buried thrust faults that are not exposed at the ground surface.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 128 of 1214 Page 158 of 1692 Updated Draft Geotechnical Investigation Report
Cudahy Park Renovations
Cudahy, California
Willdan Project No. 112093-4000
September 27, 2024
4 TABLE 1 NEARBY FAULTS
Fault
Approximate
Distance
(miles)
Maximum Moment
Magnitude (Mmax)
USGS (2014)
Puente Hills Blind Thrust
(Los Angeles Segment) 2.5 7.2
Newport-Inglewood 6.7 7.4
Compton Blind Thrust 7.4 7.4
Whitter 7.6 7.0
Elysian Park Blind Thrust 8.0 7.0
Earthquake magnitudes obtained from the USGS website
http://geohazards.usgs.gov/cfusion/hazfaults_search/hf_search_main.cfm

5.0 GEOTECHNICAL INVESTIGATIONS

5.1 FIELD EXPLORATION
Field exploration for this investigation consisted of drilling two (2) Hollow Stem Auger (HSA) borings to a depth of 21.5 feet bgs each for soil sampling and testing in addition to one HSA boring to a depth of 5 feet bgs for a percolation test as illustrated in Figure 3 Boring Location Map.

Relatively undisturbed, disturbed and bulk soil samples were collected from each soil boring during drilling. Bulk samples were collected from HSA cuttings obtained from within the nearsurface depths. At selected depths throughout the boring depths, disturbed and relatively undisturbed soil samples were collected by a split-spoon sampler and three-inch outside diameter Modified California Sampler lined with brass rings, respectively.

The explorations were visually classified and logged by a Willdan field engineer. Classification of the soils encountered in HSA borings was made in general accordance with the Unified Soil Classification System (USCS), using a visual-manual procedure (ASTM D2488) and/or based on laboratory testing (ASTM D2487). For a more detailed description of the soil conditions and depth and thickness, please refer to the boring logs in Appendix A. All drilled holes were backfilled with cement/slurry per the LA County Permit.

5.2 LABORATORY TESTING
Laboratory testing included determining in-situ moisture and dry density, sieve analysis, Atterberg limits, direct shear, consolidation, corrosion potential and expansion index for soil samples collected from various depths. Laboratory tests were conducted according to the American Society for Testing of Materials (ASTM) Standards or California Test Methods (CTM). Composite soil testing were conducted on soil cuttings retrieved during field drilling. All laboratory test results are summarized and presented in Appendix B, Laboratory Test Results. Note that soil cuttings are Cudahy Park Renovation Project, Project # PRE-001 Document Control 129 of 1214 Page 159 of 1692 Updated Draft Geotechnical Investigation Report
Cudahy Park Renovations
Cudahy, California
Willdan Project No. 112093-4000
September 27, 2024
5 classified as CA Hazardous for Lead per the results of composite soil testing.

5.3 SUBSURFACE CONDITIONS
The HSA borings revealed the existing earth materials within the exploration depth consisted primarily of Fill and brown Silty to Clayey SAND and Sandy to Silty CLAY. The moisture content was tested to be between 9.4% and 24.4% with a degree of saturation ranging from 40.2% to

95.8%. The dry density of the soils is between 88.9 pound cubic feet (pcf) and 119.1 pcf.

5.4 GROUNDWATER
Groundwater was not encountered during the time of field exploration. The groundwater level will fluctuate in response to rainfall, seasonal climate variations, on-site irrigation, near-site development, and other factors. CDMG Seismic Hazardous Zone Report for the South Gate 7.5- Minute Quadrangle, Los Angeles County, California (1998) indicates that the historically highest groundwater level in the region of the Project site is at a depth of 8 feet bgs.

6.0 SEISMIC HAZARDS

6.1 SITE CHARACTERIZATION – SITE CLASS
The subsurface soil profile at the site can be classified from a seismic standpoint, based on the conditions encountered in all exploratory borings and anticipated within the upper 100 feet of the area based on geologic mapping, as being shallow alluvium extending over 100 feet. Based on the materials encountered at the subject site and considering the geologic units mapped in the area, our opinion is that the site soil profile corresponds to Site Class D, following Section 1613.2.2 of CBC 2022.

6.2 GROUND SHAKING
Although ground rupture is not considered a significant concern at the subject site per California Earthquake Hazards Zone Application (https://maps.conservation.ca.gov/geologichazards/ & https://maps.conservation.ca.gov/cgs/EQZApp/) , the site will likely be subject to moderate to severe seismic shaking during its lifetime. For this report, an acceleration of 0.899g and 0.79g may be used for the design maximum considered earthquake geometric mean (MCEG) peak ground acceleration adjusted for site class effects (PGAM) as detailed in Appendix C per ASCE 7-16 and 7-22, respectively (https://asce7hazardtool.online/).

6.3 SOIL LIQUEFACTION
Soil liquefaction is a temporary soil particle suspension caused by loss of strength due to pore pressure increase resulting from cyclic stress application induced by earthquakes and the resultant drop in effective stress and soil shear strength. Liquefaction commonly occurs in saturated granular soils, such as sands, where the strength is purely frictional. Soils most susceptible to liquefaction are saturated, loose, uniformly graded, fine-grained sand deposits. However, liquefaction has occurred in soils other than clean sands. Silty sands and sandy silts have also been reported to be susceptible to liquefaction or partial liquefaction. The occurrence of liquefaction is Cudahy Park Renovation Project, Project # PRE-001 Document Control 130 of 1214 Page 160 of 1692 Updated Draft Geotechnical Investigation Report
Cudahy Park Renovations
Cudahy, California
Willdan Project No. 112093-4000
September 27, 2024
6 generally limited to soils located within the top 50 feet of the ground surface. Primary factors affecting the potential for soil to undergo liquefaction include:
1) Depth to groundwater;
2) Soil type;
3) Relative density of the soil and initial confining (overburden) pressure; 4) Intensity and duration of ground shaking.

Potential problems associated with soil liquefaction include ground surface settlement, loss of foundation-bearing support strength, and lateral spreading. While liquefaction occurs in confined sand layers, a phenomenon called sand boils may occur at the ground surface. Sand boils occur when groundwater’s sudden compression in a layer of saturated, clean, loose sand builds sufficient pressure to rupture through the upper soil mantle to the ground surface. When this occurs, the liquefied sand’s displacement results in the sudden loss of support of structures supported by shallow foundations.

The Project site has been mapped as being within a zone susceptible to liquefaction designated by the State of California (CGS, 1999), Liquefaction Hazards Zone Map. Based on the CGS’s SP117A, “The intent of the State's Seismic Hazard Map Zoning program is to ensure that a minimum level of public safety and protection is met for projects in zones of required investigation.

The acceptable level of risk by State standards is one that ensures life safety in most residential and commercial structures. Hospitals, schools and other essential services buildings are held to higher levels of operability and are inspected and reviewed using different standards.” Based on the conceptual project plans provided by Willdan Design team, this project does not include residential/commercial structures, and hospitals/schools/other essential services buildings.

However, for a peak ground acceleration of 0.60g corresponding to the 2/3 of the Full Peak Ground Acceleration (PGAM) obtained from ASCE Hazard Tool and a Groundwater Level (GWL) at a depth of 8 feet bgs and a Magnitude of 7.5, liquefaction-induced settlement at the site has been calculated to be on the order of 8 - 11.5 inches based on the soil profile encountered in Borings B1 and B-2. The corresponding differential liquefaction-induced settlement will be typically considered to be on the order of one-half (1/2) of the liquefaction-induced settlement, i.e., 4 to 5.8 inches. The results of liquefaction analyses suggest that liquefaction-prone soil strata exist on the site at depths from approximately 5 to 50 feet bgs in Borings B-1 and B-2. Due to the relatively large liquefaction-induced settlement and differential liquefaction-induced settlement, it is deemed geotechnically necessary to implement ground modification in site subgrade soils to mitigate the potentially significant ground hazards and allow for the construction of the following proposed features but not limited to:
• Electrical switchboard & transformer concrete,
• Storage building,
Cudahy Park Renovation Project, Project # PRE-001 Document Control 131 of 1214 Page 161 of 1692 Updated Draft Geotechnical Investigation Report
Cudahy Park Renovations
Cudahy, California
Willdan Project No. 112093-4000
September 27, 2024
7 • Two 30-foot high flag poles,
• Community amphitheater,
• Community art mural wall,
• Shade canopies, and
• Field lightning.

Based on the liquefaction-induced settlement calculations, ground modification consisted of vibro stone columns (VSCs) or similar extending to 38 feet depth could reduce the post-ground modification liquefaction-induced settlement to 4.0 inches in Boring B-1, with the corresponding differential liquefaction-induced settlement reduced to 2.0 inches. The layout of VSCs should be in equilateral triangular pattern with a VSC diameter of three (3) feet spaced at an interval of six (6) feet center-to-center.

6.4 SURFACE FAULT RAPTURE
Because the active faults have not been identified near the site, we consider the potential for surface rupture from fault plane displacement propagating to the surface remote.

6.5 LATERAL SPREADING
Lateral spreading happens when surficial soil moves parallel to the ground surface due to the liquefaction of underlying subsurface soil layers. Lateral spreading usually occurs where the ground surface has a slope of less than 6 percent and may damage structures or other improvements due to differential lateral movements (Naeim, 1989). The potential for lateral spreading to occur at the project site during seismic events is low.

7.0 CONCLUSIONS AND RECOMMENDATIONS

7.1 GENERAL
Based on our geotechnical investigation, the proposed development is feasible from a geotechnical viewpoint, provided the recommendations in this report are implemented in the design and construction of the project. The following recommendations are based upon subsurface conditions encountered in our limited field investigation; these near-surface soil conditions could vary across the site. Variations in the soil conditions may not become evident until the commencement of grading operations for the proposed development and revised recommendations from the soils engineer may be necessary based upon the conditions encountered. It is recommended that site inspections are performed by the representative of a registered Geotechnical Engineer or Certified Engineering Geologist during all grading and construction of the development to verify the findings and recommendations documented in this report.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 132 of 1214 Page 162 of 1692 Updated Draft Geotechnical Investigation Report
Cudahy Park Renovations
Cudahy, California
Willdan Project No. 112093-4000
September 27, 2024
8 To mitigate potentially significant liquefaction-induced settlement at the site, the construction of the proposed features as listed in Section 6.3 including storage building and other improvements should adopt a composite foundation scheme consisted of a ground modification measure with vibro stone columns (VSCs) installed from the bottom of Geosynthetics-Reinforced Load Transfer Platform (GRLTP) layer that is five (5) feet in depth, to thirty-six (36) feet bgs and a GRLTP layer constructed over VSCs within the upper five (5) feet. By adopting these measures, the calculated liquefaction induced settlement associated with subgrade soils at the site could be significantly reduced that will subsequently allow the storage building and other improvements to be supported by conventional shallow footing foundation.

The following sections present a discussion of geotechnical related requirements for specific design recommendations of various aspects of the project.

7.2 EARTHWORK
Earthwork should be performed following the latest version of Standard Specifications for Public Works Construction (Greenbook 2021) and the City of Cudahy’s grading requirements.

Excavations and cuts should be inspected during grading.

7.2.1 Site Preparation
The contractor should take all necessary measures to protect existing utilities within the project limits during site preparations. All abandoned utilities encountered should be drained for all content, if any, and properly capped. Any existing foundations, shallow footings, piles, and grade beams, exposed during excavation/grading activities should be identified, analyzed for possible adverse effects and conflict with the new foundation, and, if necessary, removed and disposed of offsite.

The soils exposed under the existing ground surface may be used for support of the proposed foundation. Note that soil cuttings retrieved during our field investigation are classified as CA Hazardous for Lead as noted in Section 5.2.

If encountered, all undocumented fill and/or disturbed soil shall be removed to competent native materials, and the exposed surface should be scarified to a depth of 12 inches, brought to within 2% of optimum moisture content and compacted to a minimum of 90% of the laboratory standard (ASTM: D 1557) prior to placement of any additional compacted fill soils, foundations, slabs-ongrade and pavement. Grading shall extend a minimum of five horizontal feet outside the edges of foundations or equidistant to the depth of fill placed, whichever is greater.

If unsuitable soils are encountered, over-excavation should be performed to a minimum depth of 2 feet, measured from the bottom of the new foundation. The removal should extend at least 2 feet outside the perimeter of the proposed foundation, where feasible. After removing unsuitable soils and before placing any fill, the bottom of removal shall be observed and confirmed to be competent by the Geotechnical Engineer of Record. If the exposed subgrade soils are not stable and pumping, deeper removals may be required, or it may be improved by placing 1 to 2 feet of 2” crushed rock Cudahy Park Renovation Project, Project # PRE-001 Document Control 133 of 1214 Page 163 of 1692 Updated Draft Geotechnical Investigation Report
Cudahy Park Renovations
Cudahy, California
Willdan Project No. 112093-4000
September 27, 2024
9 sandwiched by layers of filter fabric, MiraFi 140 or equivalent.

Following the over-excavation, the areas to receive engineered fill shall be sacrificed to a minimum depth of 8 inches, moisture-conditioned within optimum and 2 percent above optimum moisture content and compacted to at least 90% of the maximum dry density obtained per ASTM D1557.

The excavated zone then shall be backfilled with engineered fill. Unless stated otherwise, all fill materials should be placed in loose lifts of 8 inches or less, moisture-conditioned within optimum and 2 percent above optimum moisture content and compacted to at least 90% relative compaction of the maximum density as determined by the ASTM D1557. Compaction should be verified by observation, probing, and testing by a geotechnical consultant’s representative.

7.2.2 Fill Materials
The on-site soils may be reused for backfilling purposes if the soils conform to the materials and gradation requirements for fill materials stated in this section. Note that soil cuttings retrieved during our field investigation are classified as CA Hazardous for Lead as noted in Section 5.2.

Imported soils are anticipated to be used in the required compacted fills and backfills. Imported materials should contain sufficient fines (binder material) to be relatively impermeable and result in a stable subgrade when compacted. The imported materials should also be non-expansive, with an Expansion Index of less than 30 and free of organic materials, debris, and cobbles larger than 3 inches, with no more than 25 percent of materials being larger than 2 inches in size and no more than 25 percent passing #200 sieve. A bulk sample of potential import material, weighing at least 30 pounds, should be submitted to the Geotechnical Consultant at least 48 hours before fill operations. The Geotechnical Consultant should approve all proposed import materials before being placed at the site.

7.2.3 Temporary Excavation
Temporary unsurcharged excavations must be adequately sloped or shored. Based on the earth materials encountered in our borings, excavation of 4 feet or less in depth may be performed with vertical sidewalls unless granular (cohesionless) soils are encountered. Deeper excavation can be accomplished per the Occupational Safety and Health Administration (OSHA) requirements, and it shall be laid back at a 1H:1V gradient or flatter.

Excavations adjacent to any existing footing should be performed in a slot cut, not completely removing the lateral support, under close observation of the geotechnical engineer’s representative.

The contractor is responsible for maintaining the stability of the cuts and personnel safety in the field during construction. All excavations shall be performed per applicable requirements established by the State, County, or local government. The regulatory requirement may supersede the recommendations presented in this section. The Geotechnical Engineer of Record’s representative should be present during all excavations.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 134 of 1214 Page 164 of 1692 Updated Draft Geotechnical Investigation Report
Cudahy Park Renovations
Cudahy, California
Willdan Project No. 112093-4000
September 27, 2024
10 7.3 SEISMIC DESIGN PARAMETERS
The site class designation is based on the soil conditions, per Section 1613.2.2 of the CBC 2022.

It is our opinion that a risk Category II and Site Class D is most consistent with the subject site soil conditions. For the design of the structures based on the seismic provisions of ASCE 7-16, we recommend the parameters in Table 2.

TABLE 2 SEISMIC DESIGN FACTORS PER ASCE 7-16
Seismic Item Value
Site Class D
Ss 1.752
SMS 2.102
SDS 1.401
S1 0.625
SM1 N/A
SD1 N/A
MCEG Peak Ground Acceleration adjusted for Site Class Effect, PGAM 0.899g

7.4 FOUNDATION DESIGN

7.4.1 General
From geotechnical perspectives, the courts, skate park and playground may be supported by concrete slab-on-grade given that the recommended over-excavation and compaction with imported fill as noted in Section 7.2.1 is adopted, if needed.

The following proposed features are recommended to be supported by a composite foundation scheme consisted of a ground modification measure with vibro stone columns (VSCs) installed from the bottom of Geosynthetics-Reinforced Load Transfer Platform (GRLTP) layer that is five (5) feet in depth, to thirty-six (36) feet bgs and a GRLTP layer constructed over VSCs within the upper five (5) feet.
• Electrical switchboard & transformer concrete,
• Storage building,
• Two 30-foot high flag poles,
• Community amphitheater,
• Community art mural wall,
Cudahy Park Renovation Project, Project # PRE-001 Document Control 135 of 1214 Page 165 of 1692 Updated Draft Geotechnical Investigation Report
Cudahy Park Renovations
Cudahy, California
Willdan Project No. 112093-4000
September 27, 2024
11 • Shade canopies, and
• Field lightning.

7.4.2 Shallow Foundation on GRLTP
As noted in Sections 6.3 and 7.1, proposed storage building, and other improvements need to be founded by shallow foundations supported by a combination of VSCs and GRLTP due to the liquefaction-induced settlement.

The shallow square footings supported by GRLTP should be at least 24 inches wide and embedded at least 24 inches into the approved compacted soils. The foundations supported on GRLTP may be designed for an allowable pressure of 1,500 psf due to dead plus live loads. The bearing capacity may be increased by one-third for transient loads such as seismic or wind. Foundation design details such as concrete strength, reinforcements, etc. should be established by the Project Structural Engineer.

Footings adjacent to utility trenches or other footings should be deepened as necessary so that their bearing surfaces are below an imaginary plane with an inclination of 1H:1V, extending upward from the bottom edge of the adjacent trench or footing.

Resistance to Lateral Loads: Lateral soil resistance will be provided by a combination of frictional resistance between the bottom of the footings and the underlying soils and by passive soil resistance acting against the side of the footing. For site preparation implemented as per recommended in the pertinent sub-sections of Section 7.2, an ultimate frictional coefficient of 0.35 between concrete and soil may be used. For passive resistance, an equivalent fluid pressure of 250 pcf may be used for a level ground surface condition in front of the footing, subject to a maximum of 2,000 pcf. Note that the design of most shallow foundations conservatively ignores passive resistance per FHWA-SA-02-054 Geotechnical Engineering Circular No 6 Shallow Foundations (2002). When combining both frictional and passive resistance, the passive resistance should be reduced by one-third. The recommended value for passive resistance may be increased by onethird for short-term loading.

Note that the analysis and recommendation for a deep foundation system, such as driven concrete piles would require additional exploratory borings extended to greater depths where nonliquefiable competent soils are encountered, on which the deep foundation would have to extend to and gain bearing support from, as liquefaction-prone soils have been identify to a maximum depth of 50 feet below the existing ground surface. The Project Geotechnical Engineer should be engaged for additional investigation if the Client would like to explore further on the deep foundation.

Settlement: The total static settlements due to structural loads will are assessed once the design structural loads for the proposed features are provided to us by the Design Team.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 136 of 1214 Page 166 of 1692 Updated Draft Geotechnical Investigation Report
Cudahy Park Renovations
Cudahy, California
Willdan Project No. 112093-4000
September 27, 2024
12 7.5 CONCRETE SLAB-ON-GRADE

7.5.1 General
Concrete slab-on-grade may be constructed on compacted fill prepared per recommendations provided in Section 7.2. The slab-on-grade should be at least 5 inches thick and reinforced with a minimum No. 3 rebar at 18 inches on center. Concrete slab-on-grade may be designed using a maximum bearing pressure of 1,000 psf.

7.5.2 Moisture-Sensitive Floor Covering
An impermeable membrane (vapor barrier) should be installed below the concrete in contact with soil to reduce excess vapor drive through the slab. The membrane should be at least 10-mil thick, and care should be taken to preserve the continuity and integrity of the membrane beneath the floor slab. At least 4 inches of free drainage gravel, with no more than 2 percent passing No. 200 sieve, should be placed below the vapor barrier to serve as a capillary break. The gravel layer shall be compacted to a minimum of 92% relative compaction per ASTM D1557. The gradation for the free drainage material used shall conform to the No. 3 Concrete Aggregates requirements as specified in section 200-1.4 of the latest edition of Greenbook.

Another factor affecting vapor transmission through floor slabs is the water-to-cement ratio in the concrete used for the floor slab. The water-to-cement ratio increases the porosity of the concrete, thereby facilitating the transmission of water vapor through the slab. The Project Structural Engineer should provide recommendations for concrete design for footings and concrete slab-ongrade per the latest version of the applicable codes.

7.6 SOIL CORROSIVITY
Two representative bulk samples obtained from the borings drilled within the subject project site were tested for pH, minimum resistivity, soluble chloride content, and soluble sulfate content per Caltrans CTs 417, and 422 and 643. The measured resistivity, soluble chloride, and pH value indicate that onsite soils can be classified as non-corrosive to structural elements. A further interpretation of the corrosivity test results and providing corrosion design and construction recommendations are referred to corrosion specialists, if necessary.

7.7 EXPANSION POTENTIAL
Two representative bulk samples obtained from the borings drilled within the subject project site were tested for expansion potential per ASTM D4928. The measured Expansion Index (EI) of 3 and 6 suggests that onsite soils are of low expansion potential.

7.8 INFILTRATION TESTING
The average infiltration rate for the soils within the upper 5 feet of the subsurface was measured by falling head percolation test conducted at Boring P-1. Boring location is shown in Figure 1.

The percolation test for the subject Project site was performed in accordance with the County of Cudahy Park Renovation Project, Project # PRE-001 Document Control 137 of 1214 Page 167 of 1692 Updated Draft Geotechnical Investigation Report
Cudahy Park Renovations
Cudahy, California
Willdan Project No. 112093-4000
September 27, 2024
13 Los Angeles Guidelines, Low Impact Development (LID), Standard Manual (GS200.2, 2017).

During the field investigation, the 8-inch diameter boring was lined with 3-inch diameter perforated PVC pipes surrounded by gravel filter packs. The hole was presoaked to provide an equilibrium condition prior to recording the time and drop in water level. The water level was monitored for about 20 minutes, with measurements taken every twenty (20) minutes. The test data and calculations are attached to this report. The measured infiltration rates were reduced using the reduction factors addressed in LID manual (GS200.2, 2017) to determine the design values.

The infiltration test results are provided in Table 3. Calculation of Infiltration test is shown in Appendix D.

The design infiltration rate calculated was found to be less than the minimum required rate of 0.3 in/hr as addressed in LID manual. Based on the test results, the measured infiltration rate at the test location P-1 does not warrant the sufficient amount of water flow infiltration through the existing soil layers.

TABLE 3 INFILTRATION TEST RESULTS
Percolation
Test Boring
Reduction Factor Infiltration Rate (in/hr)
RFt RFv RFs RF Measured Design
P-1 1 1 1.25 1.25 0.26 0.16
RF = RFt × RFv × RFs
Design Infiltration Rate = Measured Infiltration Rate / RF

7.9 REVIEW OF CONSTRUCTION PLANS
Recommendations contained in this report are based on preliminary plans. The geotechnical consultant should review the final construction plans and specifications to confirm that the general intent of the recommendations contained in this report has been implemented into the final construction documents. Recommendations contained in this report may require modification based on the final design.

7.10 GEOTECHNICAL OBSERVATION AND TESTING
It is recommended that the geotechnical consultant perform inspection and testing during the following stages of construction:
 Grading operations;
 Structure footing excavations; and
 When any unusual subsurface conditions are encountered.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 138 of 1214 Page 168 of 1692 Updated Draft Geotechnical Investigation Report
Cudahy Park Renovations
Cudahy, California
Willdan Project No. 112093-4000
September 27, 2024
14 8.0 CLOSURE
This report is intended for proposed improvements at Cudahy Park in the City of Cudahy, California and its consultants for design and construction associated with proposed improvements.

The findings and recommendations contained in this report are based on the results of the limited field investigation, laboratory tests, and engineering analyses, combined with an extrapolation of subsurface conditions between and beyond the boring locations.

Services performed by Willdan Engineering have been conducted following generally accepted professional geotechnical engineering principles and practices at this time. No other representation, express or implied, and no warranty or guarantee is included or intended.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 139 of 1214 Page 169 of 1692 Updated Draft Geotechnical Investigation Report
Cudahy Park Renovations
Cudahy, California
Willdan Project No. 112093-4000
September 27, 2024
15 9.0 REFERENCES
California Building Code, CBC 2022.

California Department of Conservation (CDOC), Division of Mines and Geology (1998), Seismic Hazard Zone Report for the South Gate 7.5-Minute Quadrangle, Los Angeles County, California Corrosion Guidelines Version 3.0 (2018), California Department of Transportation.

California Geological Survey (CGS). 2010. California Geological Survey—Alquist-Priolo Earthquake Fault Zones.

CGS (2008) Guidelines for Evaluating and Mitigating Seismic Hazards in California, Special Publication 117ACGS Earthquake Zones of Required Investigation - South Gate Quadrangle (March 25, 1999)
Norris R.M. and Webb, R.W. (1990), Geology of California, Second Edition.

FHWA-SA-02-054 Geotechnical Engineering Circular No 6 Shallow Foundations (2002).

USGS (2014), http://geohazards.usgs.gov/cfusion/hazfaults_search/hf_search_main.cfm USGS (2014), https://geohazards.usgs.gov/deaggint
Cudahy Park Renovation Project, Project # PRE-001 Document Control 140 of 1214 Page 170 of 1692 Updated Draft Geotechnical Investigation Report
Cudahy Park Renovations
Cudahy, California
Willdan Project No. 112093-4000
September 27, 2024
16 FIGURES
Cudahy Park Renovation Project, Project # PRE-001 Document Control 141 of 1214 Page 171 of 1692 Cudahy Park Renovations, Cudahy, CA

VICINITY MAP
112093-4000 FIGURE 1
Project Site
Cudahy Park
Cudahy Park Renovation Project, Project # PRE-001 Document Control 142 of 1214 Page 172 of 1692

REGIONAL GEOLOGIC MAP
112093-4000
Project Location
FIGURE 2
Cudahy Park Renovations, Cudahy, CA
Cudahy Park Renovation Project, Project # PRE-001 Document Control 143 of 1214 Page 173 of 1692 Cudahy Park Renovations, Cudahy, CA

BORING LOCATION MAP
112093-4000 FIGURE 3
Boring Location
B-1
B-2
P-1
Cudahy Park Renovation Project, Project # PRE-001 Document Control 144 of 1214 Page 174 of 1692 (N) ROLL-UP DOOR
V01 V15 V10
V24
V12 V11
W009 #3
V02 WMM-600
V03 V09 V22 V04 V13 V03 V04 V07 WMM-600 V20 V08 W009 #1 V06 V14 V19 V18 V07 V06 V08 V17 V05 W009 #2 V08 WMM-600 V19
V21 V21
V23
V16 V05

EXISTING LIGHT AND POWER

POLE TO REMAIN
SCE POLE# 2115018E
Landscape Architecture
Comprehensive
Innovative
Trusted
SHEET 1 OF 1
0 60 feet
1" = 30'-0"
30 90
5/13/2024

CONCEPTUAL SITE P

CUDAHY PARK RENOVATION PROJECT
5220 SANTA ANA STREET CUDAHY, CA 90201

RENOVATE EXISTING

BALL FIELDS

AND UPGRADE

FIELD LIGHTING

CITY HALL

LIBRARY

BEDWELL
HALL

SKATEPARK OUTDOOR

FITNESS

BASKETBALL TENNIS
SPLASH
PAD

CHILDREN

PLAYGROUND

COMMUNITY

AMPHITHEATER

EXISTING LIGHT AND POWER

POLE TO REMAIN
SCE POLE# 1933074E

EXISTING LIGHT ON

CONCRETE POLE

TO BE REMOVED
POLE# 1933323E EXISTING LIGHT ON

CONCRETE POLE

TO BE REMOVED
POLE# 1933322E

EXISTING LIGHT ON

CONCRETE POLE

TO BE REMOVED
POLE# 1933321E

SANTA ANA ST

RIVER RD

EXISTING LIGHT AND POWER

POLE TO REMAIN
SCE POLE# 4211551E 6" 8" MAX

VARIES - SEE GRADING

PLAN & SECTIONS
6" SEE LAYOUT & SECTIONS FS
5" FS 1
3 4
5 1
2 5

SEE SECTIONS ROLL-IN
6 4000 PSI CONCRETE FLAT WORK WITH #3 REBAR @ 16" O.C. B.W. 1 2 #3 REBAR @ 16" O.C. BOTH WAYS 4000 PSI SHOTCRETE WITH #3 REBAR @ 12" O.C. B.W. 3 4 COMPACTED SUB-GRADE
5 COLD JOINT / KEY JOINT STRUCTURAL FOAM FILL TO BE EPS15 OR SIMILAR 6 IN-GROUND MOUNT -- 18” x 24” FOOTING
Standard footing for:

Example Only
Waterodyssey.com
FINISH GRADE.

MOUNTING VARIES

BASED ON ENGINEERING
REQUIREMENTS.
3" CLR.

TYP.
2'-0"
3" CLR.

TYP.
5'-0"
9"
MIN.
3/4" HEADED ANCHOR

PROVIDED BY OTHERS
(3) #4 TIES AT 2" O.C.

AT TOP
(8) #6 VERTS
#4 TIES EQUALLY SPACED
AT 12" O.C. MAX.

CONCRETE FOOTING

MATERIALS BY OTHERS
(4) #12-24 HWH #5 POINT

SELF DRILLING SCREWS

AT COVER PLATE
WP2
CP1
PA

FOUNDATION SECTION
Scale: 1" = 1'-0"
Example Only

STORAGE
BUILDING Example Only 24" 24" DIA. 3" MIN.
2" MIN. SIX #4 VERTICAL REINFORCING BARS PSI SHALL BE CALCULATED BY STRUCTURAL ENGINEER SEVEN HOOP TIES (#5 REINFORCING BARS) SPACED EQUALLY 48" FINISH GRADE CONCRETE FOOTING SEE SITE LIGHTING PLAN FOR SIZE OF CONDUIT AND NUMBER OF WIRES 6" 41" 24' 26'-2.75" DETAIL 1 - ANCHOR BOLT DETAIL CONCRETE PEDESTAL HAND HOLE OPENING DETAIL 2 - BOLT COVER DETAIL 8" O.D. SMOOTH EXTRUDED TUBE, 6061 ALLOY, 0.1875" WALL THICKNESS 4.5" SCH. 40 PIPE (5" O.D. x 0.247" WALL) SEE DETAIL 5 - K828 FIXTURE 28" 18.25" 1.25"Ø WIREWAY SEE DETAIL 1 - ARM MOUNTING BRACKETS 2" NPT NIPPLE SECURED INTO DECORATIVE ARM FOR FIXTURE MOUNT. PLEASE CONFIRM.

ELECTRICAL

SWITCHBOARD &

TRANSFORMER

CONCRETE PAD
1 3
4 6
8 10 10 8
10 11
8" 6" THICK CAB
12" 12"

CONCRETE DESIGN FOR BASKETBALL COURT SLAB, TENNIS COURT

SLAB AND ELECTRICAL SWITCHBOARD & TRANSFORMER PAD
Cudahy Park Renovation Project, Project # PRE-001 Document Control 145 of 1214

COMMUNITY ART

MURAL WALL
COMMUNITY ART MURAL WALL TWO 30-FOOT

HIGH FLAG POLES

Page 175 of 1692 ends

Updated Draft Geotechnical Investigation Report
Cudahy Park Renovations
Cudahy, California
Willdan Project No. 112093-4000
September 27, 2024
17 APPENDIX A. BORING LOGS
Cudahy Park Renovation Project, Project # PRE-001 Document Control 146 of 1214 Page 176 of 1692 Cudahy Park Renovation Project, Project # PRE-001 Document Control 147 of 1214 Page 177 of 1692 Cudahy Park Renovation Project, Project # PRE-001 Document Control 148 of 1214 Page 178 of 1692 Updated Draft Geotechnical Investigation Report
Cudahy Park Renovations
Cudahy, California
Willdan Project No. 112093-4000
September 27, 2024
18 APPENDIX B. LABORATORY TEST RESULTS
Cudahy Park Renovation Project, Project # PRE-001 Document Control 149 of 1214 Page 179 of 1692 PROJECT : TECHNICIAN :

Top
Bottom
Remarks :

MOISTURE - DENSITY TESTS
Hole No.

Sample No.

Sample Depth: 5'
R-4
15'
Dish No.
5 2
163.97

56.82 0.288
153.66
NO.: 112093-4000 RMC DATE : 02-Nov-23

0.406
>4.50
1008.00

99.3 95.8
201.75
173.82

24.4 119.1

62.6 114.24

0.405
130.3

9.4 No. of Rings
209.89

0.684
123.6
127.80
112.8

59.58 Weight of Moist Soil and Rings, (gms.)

2.00 967.70
5 7
Pocket Penetrometer Reading, (tsf) >4.50
5 12
228.27
5 25
5'
902.90
BR. SILT /SILTY FINE SAND
( ML/SM)

19.7 Void Ratio
Weight of Dry Soil, (gms.)
Dry Density, (pcf)
Weight of Dish, (gms.)
Wet Density, (pcf)
Weight of Moist Soil and Dish, (gms.)

88.9 Porosity, (n)
Weight of Dry Soil and Dish, (gms.)

68.1 0.775

0.437
Moisture Content, (%)
Degree of Saturation, (%) (Gs =2.68)
213.75
R-4
15'
B-1
R-2
B-2
R-2
100.7

1.00 0.468

40.2 0.881
830.50

94.65 151.47

94.2 56.90 60.09
184.70

13.2 CUDAHY PARK
Visual Soil Classification

S A M ES A M E
BR. SILTY/CLAYEYSAND WITH GRAVEL
( SM/SC )
Cudahy Park Renovation Project, Project # PRE-001 Document Control 150 of 1214 Page 180 of 1692 Project Name : Project Number :

Boring No. : Sample No.: Depth/Elev.: Tested by : Date
Location / Source : Sampled by: Date
Sample Descriptions / Classification : ( )
Wt.of Air Dry Sample, (g)
Wet Weight of Soil,(g) Wt.of Oven Dry Sample, (g)
Dry Weight of Soil,(g)
Moisture Content,(%)
Specific Gravity (g) = (Assumed) Correction Factor (a) = (+)#10 Sieve,(g)
(-)#10 Sieve,(g)
Hard & Durable
Hardness Soft
Weathered & Friable
D60
Coefficient of Uniformity,Cu
Coefficient of Curvature,Cc
Remarks :
27-Oct-23
-
SM
B-1 S-5 20'
Hygroscopic Moisture
RMC

CUDAHY PARK RENOVATIONS
-
HYDROMETER ANALYSIS (ASTM STD HYDROMETER 152H)
N/A
10-Nov-23
112093-4000

SIEVE ANALYSIS
RMC

BROWN SILTY FINE SAND

0.99 % P L/T
(mm)
k Diameter
Date
Temp.(0C) Hydro.Rdg.Cor. K Value

2.7 Corrected
Material Passing Sieve No.
(cm) Value (cm/min)
10 Elapsed L
Time C R % P
Time(min)
Temp.
(
0C)
R'

0.50 0.25

2.00 1.00

5.00 4.00

15.0 30.0

60.0 240.0
1440.0
Weight Retained Cummulative
% %
Sieve
Size
Opening
(mm) (g) (g) Retained Passing
Individual Cummulative
Moist
- -
Shape
Rounded
X
Specification
%
Passing
Total Wt. of Dry Soil,(g) 500.52
Dry
Angular
Sand & Gravel Particle Descriptions
- -
3" 75.0
1-1/2" 38.1
2" 50.0
1" 25.0
3/4" 19.0
1/2" 12.5
#4 4.75 0.0
3/8" 9.5

0.2 99.8

0.0 100.0
#10 2.00 -
#8 2.36 0.8
#30
- -
#16 1.18 2.0 0.4 99.6
#200 0.075 298.4
#50 0.300 38.0

0.600

40.4 7.6 98.5

0.150
D10
D30
X
#DIV/0!
#DIV/0!

32.5 67.5

59.6 1.5

7.6 92.4

GRAIN - SIZE ANALYSIS
#100 162.8
N / A
Cudahy Park Renovation Project, Project # PRE-001 Document Control 151 of 1214 Page 181 of 1692 Project No. : Project Name :

Nat.W %
FINE

COBBLES S A N D

MEDIUM FINE
US STD. SIEVE OPENING IN INCHES US STD. SIEVE NUMBERS HYDROMETER

G R A V E L SILT OR CLAY
PL
-

COARSE COARSE
-
PI
-
LL

GRAIN SIZE CURVE
Boring No. Classification

BROWN SILTY FINE SAND
Symbol
SM
Depth
20'
Sample No.

B-1 S-5
112093-4000 CUDAHY PARK RENOVATIONS

0.0 10.0

20.0 30.0

40.0 50.0

60.0 70.0

80.0 90.0
100.0
100.00 10.00 1.00 0.10 0.01

PERCENT FINER BY WEIGHT

GRAIN SIZE IN MILLIMETERS
3/4"
#4
#10
3"
#40
#200
1-1/2"
3/8"
Cudahy Park Renovation Project, Project # PRE-001 Document Control 152 of 1214 Page 182 of 1692 Project Name : Project Number :

Boring No. : Sample No. : Depth : Tested by : Date :

Location / Source : Sampled by: Date :

Sample Descriptions / Group Name : ( )
Wt.of Air Dry Sample, (g)
Wet Weight of Soil,(g) Wt.of Oven Dry Sample, (g)
Dry Weight of Soil,(g)
Moisture Content,(%)
Specific Gravity (g) = (Assumed) Correction Factor (a) = (+)#10 Sieve,(g)
(-)#10 Sieve,(g)
Shape Rounded
Angular
Hard & Durable
Soft
Weathered & Friable
Coefficient of Uniformity,Cu
Coefficient of Curvature,Cc
X
% Fines
0 13.3

86.7 % Gravel
% Sand
D10 D60
Hardness
Sand & Gravel Particle Descriptions
D30
BROWN CLAYEY SAND SC (Group Symbol)

0.99 0.68
HYDROMETER ANALYSIS (ASTM STD HYDROMETER 152H)

62.35 Material Passing Sieve No.

0.02253

0.4133

0.00637

0.01380

0.00878

0.2150

10.9 0.01365 2.7250

0.01365 0.7933

12.4 (mm)

SIEVE ANALYSIS
Moist Dry

0.03037

0.01365

61.93 2.65
(cm/min)
10 L k Diameter
C R % P (cm) Value

75.81 Hygroscopic Moisture

75.3 Temp.(0C) Hydro.Rdg.Cor. K Value
Elapsed % P L/T
R' Time(min) Corrected Date Time
Temp.
(
0C)
9-Nov 7:19 0.5 -

1.00 4.6 34.4 55.0 4.9500

4.00 20.0

2.00 20.0
33 4.6 28.4 45.4 45.3
39 54.9 9.9 0.01365

15.0 20.0 27 4.6 22.4 35.8 35.8 11.9 0.01216

30.0 20.0 24

60.0 19.5 21 4.5 26.3 12.9

19.4 31.0 31.0

26.4 0.01374

4.6 250.0 19.5 17 4.5

16.5 20.0 13.5 0.01374 0.00319
1440.0 19.1 14 4.5 0.0097

0.0540

9.5 15.2 15.2 14.0

12.5 20.0

0.00136
Sieve
Size Opening
(mm)
Individual Cummulative
Weight Retained Cummulative
%
328.52 Specification
%
Passing
Total Wt. of Dry Soil,(g) %
(g) (g) Retained Passing
- 0.5
192.59 191.294
3" 75.0
1-1/2" 38.1
2" 50.0
1" 25.0
3/4" 19.0
3/8" 9.5
1/2" 12.5
#8 2.36 -
#4 4.75
#16 1.18 -
#10 0.46

0.150

1.5 0.1
#100

0.8 #200

0.5 13.3
Remarks :

0.075 43.6
#30

7.2 0.600 0.2
-
#50 0.300

2.00 0.0 0.0

CUDAHY PARK RENOVATIONS

2.2 99.9

99.5 B-2 S-5
112093-4000
RMC 27-Oct-23
100.0
20' RMC 9-Nov-23

86.7 X

GRAIN - SIZE ANALYSIS

97.8 99.8
Cudahy Park Renovation Project, Project # PRE-001 Document Control 153 of 1214 Page 183 of 1692

COBBLES
COARSE

GRAIN - SIZE
NAT.W% LL PL

COARSE FINE MEDIUM FINE
B-2 20' SC BROWN CLAYEY SAND
SAMPLE NO. DEPTH SYMBOL CLASSIFICATION
US STD. SIEVE OPENING IN INCHES US STD. SIEVE NUMBERS HYDROMETER

G R A V E L S A N D S I L T OR C L A Y
CUDAHY PARK Project No. 112093-4000 11/13/2023
The gradation curve generated using this method yields the amount of silt and clay size fractions present in the soil based on size definitions, not mineralogy or Atterberg limit data.

GRAIN SIZE ANALYSIS
PI
0 10
20 30
40 50
60 70
80 90
100
100.000 10.000 1.000 0.100 0.010 0.001

PERCENT FINER BY WEIGHT

GRAIN SIZE IN MILLIMETERS
#10
3/4"
#4
3"
#40
#200
1-1/2"
3/8"
Cudahy Park Renovation Project, Project # PRE-001 Document Control 154 of 1214 Page 184 of 1692 PROJECT NAME : PROJECT NO :

BORING NO. : SAMPLE NO./DEPTH : TESTED BY : DATE:

SAMPLE DESCRIPTIONS/CLASSIFICATION : ( )
DETERMINATION NO. DETERMINATION NO.

DISH NO. DISH NUMBER
MASS, DISH + WET SOIL (g) MASS, DISH + WET SOIL (g)
MASS, DISH + DRY SOIL (g) MASS, DISH + DRY SOIL (g)
MASS OF WATER (g) MASS OF WATER (g)
MASS OF DISH (g) MASS OF DISH (g)
MASS OF DRY SOIL (g) MOISTURE CONTENT (%) .

MOISTURE CONTENT (%) NUMBER OF BLOWS
X
EST. % RETAINED ON #40 SIEVE
CUDAHY PARK RENOVATIONS 112093-4000
B-1 S-3 @ 10' RMC 9-Nov-23
DK. BROWN LEAN CLAY CL

PLASTIC LIMIT LIQUID LIMIT
1 2 1 2 3
12 9 10 19 15

31.39 27.63 39.70 29.78 37.11 NATURAL

30.26 26.66 37.05 28.53 34.11 MOISTURE

1.13 0.97 2.65 1.25 3.00 CONTENT,%

24.1 21.16 26.95 23.98 23.62

6.16 5.50 26.2 27.5 28.6

18.3 17.6 29 23 18

RESULT SUMMARY

NATURAL MOISTURE
CONTENT, (%)
LIQUID LIMIT (LL) 27
PLASTIC LIMIT (PL) 18
PLASTICITY INDEX (PI) 9

WET ONE-POINT

SYMBOL FROM

ATTERBERG LIMITS
( ASTM D4318 )

PREPARATION DETERMINATION

AIR-DRIED MULTIPOINT X
CL

PLASTICITY CHART
REMARKS :

METHOD OF METHOD OF LL
0 10
20 30
40 50
0 10 20 30 40 50 60 70 80 90

PLASTICITY INDEX

LIQUID LIMIT

PLASTICITY CHART
CL - ML ML or OL
CL or OL
CH or OH
MH or OH
"A" LINE
"U" LINE
Equation of "A" line
Horizontal @ PI = 4 to LL = 25.5
then PI = 0.73(LL - 20)
Equation of "U" line
Vertical @ LL = 16 to PI = 7
then PI = 0.90(LL - 8)
23 28
33 10 100
MOISTURE CONTENT (%)

NUMBER OF BLOWS

FLOW CURVE
Cudahy Park Renovation Project, Project # PRE-001 Document Control 155 of 1214 Page 185 of 1692 PROJECT NAME : PROJECT NO. :

BORING NO: SAMPLE NO./DEPTH : TESTED BY: DATE:

DETERMINATION NO DETERMINATION NO.

DISH NO. DISH NUMBER
MASS OF DISH + WET SOIL,(Gms) MASS, DISH + WET SOIL,(Gms) MASS OF DISH + DRY SOIL,(Gms) MASS, DISH + DRY SOIL,(Gms) MASS OF WATER,(Gms) MASS OF WATER,(Gms)
MASS OF DISH,(Gms) MASS OF DISH,(Gms)
MASS OF DRY SOIL,(Gms) MOISTURE CONTENT,(%)
MOISTURE CONTENT,(%) NUMBER OF BLOWS
X

CUDAHY PARK RENOVATIONS

PLASTIC LIMIT (PL)

DETERMINATION

METHOD OF

PREPARATION

PLASTICITY CHART

SYMBOL FROM

PLASTICITY INDEX (PI)
N.P.

N.P.

CONTENT, (%)
-
-

NATURAL MOISTURE

LIQUID LIMIT (LL)
SAMPLE DESCRIPTIONS/CLASSIFICATION :
1 2

PLASTIC LIMIT
1 2 3 MOISTURE

LIQUID LIMIT NATURAL

BROWN SILT (ML)
performed or PL  LL
DRY
WET

MULTIPOINT

ONE-POINT

RESULT SUMMARY

METHOD OF LL
REMARKS : "NP" means
LL or PL could not be
CONTENT,%

0.00 0

ATTERBERG LIMITS
( ASTM D4318 )
RMC 9-Nov-23
112093-4000
B-2 S-3 @ 10'
X
0 10
20 30
40 50
0 10 20 30 40 50 60 70 80 90 100

PLASTICITY INDEX

LIQUID LIMIT

PLASTICITY CHART
CL - ML ML or OL
CL or OL
CH or OH
MH or OH
"A" LINE
"U" LINE
Equation of "A" line
Horizontal @ PI = 4 to LL = 25.5
then PI = 0.73(LL - 20)
Equation of "U" line
Vertical @ LL = 16 to PI = 7
then PI = 0.90(LL - 8)
25 30
35 10 100
MOISTURE CONTENT (%)

NUMBER OF BLOWS

FLOW CURVE
"COULD NOT BE
PERFORMED"

NON PLASTIC
"COULD NOT BE
PERFORMED"
Cudahy Park Renovation Project, Project # PRE-001 Document Control 156 of 1214 Page 186 of 1692 PROJECT NAME : PROJECT NUMBER :

LOCATION : TESTED BY : DATE :

SAMPLE ID / DEPTH: SAMPLED BY: DATE :

SOIL DESCRIPTIONS :

A. MINIMUM RESISTIVITY CTM 643
WATER ADDED, (ml)
RESISTIVITY MEASURED, (ohm-cm)
TEMPERATURE MEASURED, (0C)
MINIMUM RESISTIVITY (ohm-cm)
B. SULFATE CONTENT OF SOILS CTM 417
SOIL - WATER RATIO :

SO4 DILUTION (ALIQUOT : DISTILLED H2O) :

FACTOR
SULFATE READING (ppm)
WATER SOLUBLE SULFATES, (ppm)
C. CHLORIDE CONTENT OF SOILS CTM 422 (SILVER NITRATE METHOD) CHLORIDE DILUTION (ALIQUOT : DISTILLED H2O) :

NUMBER OF DIGITS REQUIRED
WATER SOLUBLE CHLORIDES, (ppm)
D. pH OF SOILS CTM 643
pH VALUE
REMARKS :

CUDAHY PARK RENOVATIONS 112093-4000
B-1 RMC 8-Nov-23
B-1 / 0 - 5' RMC 27-Oct-23
15 15 30 45
2800 2000 2200

GRAYISH BROWN SANDY CLAY (CL)
90 50 50

19.5 1950
6 100 300

CORROSION TESTS
270
90 9.0
MIN. RESISTIVITY CORRECTED , R min -15.5 (ohm-cm) 2118
5 20
2800
2000
2200
1500
1700
1900
2100
2300
2500
2700
2900
0 5 10 15 20 25 30 35 40 45 50
RESISTIVITY (ohm - cm )
WATER ADDED (ml.)
Cudahy Park Renovation Project, Project # PRE-001 Document Control 157 of 1214 Page 187 of 1692 PROJECT NAME : PROJECT NUMBER :

LOCATION : TESTED BY : DATE :

SAMPLE ID / DEPTH: SAMPLED BY: DATE :

SOIL DESCRIPTIONS :

A. MINIMUM RESISTIVITY CTM 643
WATER ADDED, (ml)
RESISTIVITY MEASURED, (ohm-cm)
TEMPERATURE MEASURED, (0C)
MINIMUM RESISTIVITY (ohm-cm)
B. SULFATE CONTENT OF SOILS CTM 417
SOIL - WATER RATIO :

SO4 DILUTION (ALIQUOT : DISTILLED H2O) :

FACTOR
SULFATE READING (ppm)
WATER SOLUBLE SULFATES, (ppm)
C. CHLORIDE CONTENT OF SOILS CTM 422 (SILVER NITRATE METHOD) CHLORIDE DILUTION (ALIQUOT : DISTILLED H2O) :

NUMBER OF DIGITS REQUIRED
WATER SOLUBLE CHLORIDES, (ppm)
D. pH OF SOILS CTM 643
pH VALUE
REMARKS :
5500
CUDAHY PARK RENOVATIONS 112093-4000
B-2 RMC 8-Nov-23
B-1 / 0 - 5' RMC 27-Oct-23
20 4530
15 15
30 45 60
9600 5300

CORROSION TESTS
300
100

8.5 BROWN SILTY/CLAYEY SAND (SM/SC)
225
50 50
MIN. RESISTIVITY CORRECTED , R min -15.5 (ohm-cm) 4976
5 20
100 300
9600
5300 5500
2500
3500
4500
5500
6500
7500
8500
9500
10500
0 10 20 30 40 50 60 70
RESISTIVITY (ohm - cm )
WATER ADDED (ml.)
Cudahy Park Renovation Project, Project # PRE-001 Document Control 158 of 1214 Page 188 of 1692 PROJECT NAME : PROJECT NUMBER :

TESTED BY : DATE :

SAMPLED BY: DATE :

SOIL DESCRIPTIONS / CLASSIFICATION :

TRIAL NUMBER RACK NO. :

WET WT. OF SOIL + RING (g) SURCHARGE : psf
WEIGHT OF RING (g)
WET WEIGHT OF SOIL (g)
FACTOR
INITIAL WET UNIT WEIGHT (pcf)
DRY DENSITY (pcf)
% SATURATION (Assumed Sp.Gr. = 2.70)
WET WEIGHT OF SOIL (g)
DRY WEIGHT OF SOIL (g) % RETAINED ON #4 SIEVE
MOISTURE CONTENT (%)
EXPANSION INDEX :

SOLUBLE SULFATE (SO4) : ppm
REMARKS :

8.3 329.73

EXPANSION INDEX OF SOILS

37.6 266.55

9.8 3
< 5
8-Nov 8:54 0.025
205.82
11:45 0.024

48.6 7-Nov 10:02
376.86

0.303
7-Nov-23
DIAL READINGS (In.)

0.022
144
27-Oct-23

0.303

DATE TIME
601.22
N/A
B-1
TRACT NUMBER :

LOT NUMBER :

SAMPLE NO. : B-1 @ 0 - 5' LOCATION :

RMC
N/A
90 395.4
119.8
( ASTM D 4829-11 )
105.4
112093-4000
RMC
1 BROWN SILT TO SILTY FINE SAND (ML/SM)
1 205.82
2 3
582.68

CUDAHY PARK RENOVATIONS
114.2
REMARKS :
304.38
292.66

MOISTURE DETERMINATION
109.1
75 85
95 105
115
125
21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6

DRY DENSITY (PCF)
% MOISTURE

SATURATION CURVE
49% Saturation
50% Saturation
Cudahy Park Renovation Project, Project # PRE-001 Document Control 159 of 1214 Page 189 of 1692 PROJECT NAME : PROJECT NUMBER :

TESTED BY : DATE :

SAMPLED BY: DATE :

SOIL DESCRIPTIONS / CLASSIFICATION :

TRIAL NUMBER RACK NO. :

WET WT. OF SOIL + RING (g) SURCHARGE : psf
WEIGHT OF RING (g)
WET WEIGHT OF SOIL (g)
FACTOR
INITIAL WET UNIT WEIGHT (pcf)
DRY DENSITY (pcf)
% SATURATION (Assumed Sp.Gr. = 2.70)
WET WEIGHT OF SOIL (g)
DRY WEIGHT OF SOIL (g) % RETAINED ON #4 SIEVE
MOISTURE CONTENT (%)
EXPANSION INDEX :

SOLUBLE SULFATE (SO4) : ppm
REMARKS :

8.3 329.73

EXPANSION INDEX OF SOILS

37.6 266.55

9.8 6
< 5
8-Nov 8:54 0.425
205.82
11:45 0.424

48.6 7-Nov 10:05
376.86

0.303
7-Nov-23
DIAL READINGS (In.)

0.419
144

0.303

DATE TIME
601.22
N/A
B-2
TRACT NUMBER :

LOT NUMBER :

SAMPLE NO. : B-1 @ 0 - 5' LOCATION :

N/A
225
395.4
119.8
( ASTM D 4829-11 )
105.4
112093-4000
RMC
2 BROWN SILTY TO CLAYEY SAND (SM/SC)
1 205.82
2 3
582.68

CUDAHY PARK RENOVATIONS
114.2
REMARKS :
304.38
292.66

MOISTURE DETERMINATION
109.1
75 85
95 105
115
125
21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6

DRY DENSITY (PCF)
% MOISTURE

SATURATION CURVE
49% Saturation
50% Saturation
Cudahy Park Renovation Project, Project # PRE-001 Document Control 160 of 1214 Page 190 of 1692 Project No. :

Depth : 5' ft Tested By : Date:

Sampled By : Date:

Applied Normal Load (ksf)
Shear Stress,Peak (ksf)
Shear Stress,Ultimate(ksf)
Initial Final Initial Final Initial Final
Wet Wt. of Soil + Ring (g) 179.04 187.9 182.9 191.1 182.4 190.3 Dry Wt. of Soil + Ring ( g) 156.5 160.1 159.5
Weight of Water (g) 22.5 31.3 22.9 31.0 22.9 30.8
Weight of Ring (g) 42.3 44.1 43.1
Weight of Dry Soil (g) 114.2 116.0 116.4
Moisture Content ( % ) 19.7 27.4 19.7 26.7 19.7 26.5
Wet Density (pcf) 113.5 120.9 115.3 122.1 115.7 122.2
Dry Density (pcf) 94.8 96.3 96.6
Specimen Thickness (in)
Specimen Diameter (in)
Degree of Saturation (%) 69.2 96.3 71.7 97.3 72.3 97.1
Void Ratio 0.763 0.736 0.731
Lateral Displacement, dh (in)
Displacement Rate, dr (in/min)
Elapsed Time of Test, te (min)
Cohesion, c (psf)
Friction Angle, f (degree)
Remarks :

B-1

SHEAR STRESS PEAK ULTIMATE
Undisturbed
Remolded
Reconstituted
Specific Gravity (Assumed)

2.416

4.0 2.544

2.68 27-Oct-23

2.0 RMC

0.783

1.0 x

8.33 CUDAHY PARK 112093-4000
RMC 10-Nov-23

1.00 1.416

1.272

2.700

DIRECT SHEAR TEST
( ASTM D3080 )
Specimen

32.5 31.5

0.25 0.03
140 65
Project Name :

Boring / Sample No :

Sample Descriptions / Classification : Brown Silt/Silty Fine Sand (ML/SM)

0.701
-
-
Density and Saturation
0 500
1000
1500
2000
2500
3000
0 0.1 0.2 0.3
SHEAR STRESS (psf)
LATERAL DISPLACEMENT (in)

0.0 1.0

2.0 3.0

4.0 5.0

6.0 0.0 1.0 2.0 3.0 4.0 5.0 6.0
SHEAR STRESS (ksf)
NORMAL STRESS (ksf)
PEAK

ULTIMATE
Cudahy Park Renovation Project, Project # PRE-001 Document Control 161 of 1214 Page 191 of 1692 Project No. :

Depth : 5' ft Tested By : Date:

Sampled By : Date:

Applied Normal Load (ksf)
Shear Stress,Peak (ksf)
Shear Stress,Ultimate(ksf)
Initial Final Initial Final Initial Final
Wet Wt. of Soil + Ring (g) 202.89 208.0 201.4 207.0 205.2 209.9 Dry Wt. of Soil + Ring ( g) 189.2 187.8 191.4
Weight of Water (g) 13.7 18.8 13.6 19.2 13.8 18.5
Weight of Ring (g) 43.5 43.4 44.7
Weight of Dry Soil (g) 145.7 144.5 146.7
Moisture Content ( % ) 9.4 12.9 9.4 13.3 9.4 12.6
Wet Density (pcf) 132.3 136.6 131.2 135.9 133.2 137.2
Dry Density (pcf) 120.9 119.9 121.8
Specimen Thickness (in)
Specimen Diameter (in)
Degree of Saturation (%) 65.8 90.5 63.9 90.4 67.5 90.7
Void Ratio 0.383 0.394 0.373
Lateral Displacement, dh (in)
Displacement Rate, dr (in/min)
Elapsed Time of Test, te (min)
Cohesion, c (psf)
Friction Angle, f (degree)
Remarks :
785 540
Project Name :

Boring / Sample No :

Sample Descriptions / Classification : Brown Clayey Sand/Silty Sand (SC/SM)

1.222
-
-
Density and Saturation

DIRECT SHEAR TEST
( ASTM D3080 )
Specimen

29.5 26.0

0.25 0.03
x

8.33 CUDAHY PARK 112093-4000
RMC 13-Nov-23

1.00 1.963

1.231

3.013

2.592

2.68 27-Oct-23

2.0 RMC

1.308

1.0 Specific Gravity (Assumed)

2.416

4.0 B-2

SHEAR STRESS PEAK ULTIMATE
Undisturbed
Remolded
Reconstituted
0 500
1000
1500
2000
2500
3000
3500
0 0.1 0.2 0.3
SHEAR STRESS (psf)
LATERAL DISPLACEMENT (in)

0.0 1.0

2.0 3.0

4.0 5.0

6.0 0.0 1.0 2.0 3.0 4.0 5.0 6.0
SHEAR STRESS (ksf)
NORMAL STRESS (ksf)
PEAK

ULTIMATE
Cudahy Park Renovation Project, Project # PRE-001 Document Control 162 of 1214 Page 192 of 1692 Project / Client Name :

Boring No.: B-2 Sample No. / Depth : R-4 @ 15' Before Test After Test Unload @ (ksf) Water @ 1.6 (ksf) Wet Wt. + Ring, (g) 174.54 182.11 Time Rate1: (ksf) Max. Load : (ksf) Dry Wt. + Ring, (g) - 157.32 Time Rate2: (ksf) Rebound to (ksf) Weight of Water, (g) 17.22 24.79 Frame No.: Tested By : RMC Weight of Ring, (g) 43.25 43.25 Soil Descriptions : Dry Wt. of Soil, (g) 114.07 114.07
Remarks : Moisture Content.(%) 15.1 21.7
Observed Maximum Particle Size : Dry Density, (pcf) 95.2 102.1 Load Stress Dial Rdg. % Void Dry density
( kg ) ( ksf ) ( inches) Consol Ratio (pcf)
11/2/2023 8:40 SEAT 0.1 0.2767 0 0.7564 95.2 0

0.4 0.2732 0.35 0.7503 95.5 Time(min.) Dial Rdg.(in.)

0.8 0.2697 0.70 0.7441 95.9 0

1.6 0.2629 1.38 0.7322 96.5 0.1

0.25 0.5
1 2
4 1.6 0.2629 1.38 0.7322 96.5 8
H2O 1.6 0.2484 2.83 0.7067 98.0 15
H2O 1.6 0.2484 2.83 0.7067 98.0 30

3.2 0.229 4.77 0.6727 100.0 60

6.4 0.1982 7.85 0.6186 103.3 120

1.6 0.2034 7.33 0.6277 102.7 240

0.4 0.2096 6.71 0.6386 102.1 480
1440
0 Time(min.) Dial Rdg.(in.)
0 0.1

0.2096 0.25

0.5 1
2 4
8 15
30 60
120
240
480
1440
CUDAHY PARK RENOVATIONS, CUDAHY, CALIFORNIA Project Number :

Date Time
Time Rate #1
Time Rate #2
LT. BROWN SANDY SILT (ML)
112093-4000

WILLDAN GEOTECHNICAL
End reading

CONSOLIDATION TEST
DATA
( ASTM D2435 )
Moisture & Density
Loading,(ksf)
Loading,(ksf)
Cudahy Park Renovation Project, Project # PRE-001 Document Control 163 of 1214 Page 193 of 1692 Boring No. : B-2 Sample No. / Depth : R-4 @ 15' -
Sample Descriptions / Classification : -
Sp. Gravity : 2.68 (Assumed) 0.081 0.011
Moisture Dry
Content Density
(%) (pcf) (%)
Initial 1.0000 15.1 95.2 53.5 0.756
Final 0.9329 21.7 102.1 91.2 0.638
Height
(inches)
Plastic Limit
Swell Index, Cs
LT. BROWN SANDY SILT (ML)
Liquid Limit
Saturation Specimen
Consolidation Test
( ASTM D2435)
CUDAHY PARK RENOVATIONS, CUDAHY, CALIFORNIA Project No. 112093-4000 Date: 11/10/2023 Void Ratio
Compression Index, Cc

0.0 1.0

2.0 3.0

4.0 5.0

6.0 7.0

8.0 9.0

10.0 0.1 1 10
Change in Height, (%)
Vertical Stress, (ksf)
Cudahy Park Renovation Project, Project # PRE-001 Document Control 164 of 1214 Page 194 of 1692

ALPHA SCIENTIFIC CORPORATION
Environmental Laboratories
16760 Gridley Road, Cerritos, CA 90703 1 Phone: (562) 809-8880, [email protected] 11-03-2023
Ms. Meriah Rangel
American Integrated Services
1502 E. Opp Street
Wilmington, CA 90744
Project: 43172
Project Site: 5220 Santa Ana Street, Cudahy, CA
Sample Date: 10-30-2023
Lab Job No.: A310066
Dear Ms. Rangel:

Enclosed please find the analytical report for the sample(s) received by Alpha Scientific Corporation on 10-30-2023 and analyzed by the following EPA methods:

EPA 8015M (Total Petroleum Hydrocarbons)
EPA 8260B (VOCs & Oxygenates by GC/MS)
EPA 6010B/7471A for CAM Metals
EPA 6010B (Lead, STLC)
EPA 6010B (Lead, TCLP)
All analyses have met the QA/QC criteria of this laboratory.

The sample(s) arrived in good conditions (i.e., chilled, intact) and with a chain of custody record attached.

Alpha Scientific Corporation is a CA ELAP certified laboratory (Certificate Number 3007). Thank you for giving us the opportunity to serve you. Please feel free to call me at (562) 809-8880 if our laboratory can be of further service to you.

Sincerely,
Roger Wang, Ph.D.

Laboratory Director
Enclosures
This cover letter is an integral part of this analytical report.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 165 of 1214 Page 195 of 1692

ALPHA SCIENTIFIC CORPORATION
Environmental Laboratories
16760 Gridley Road, Cerritos, CA 90703 2 Phone: (562) 809-8880, [email protected] Client: American Integrated Services Lab Job No.: A310066 Project: 43172
Project Site: 5220 Santa Ana Street, Cudahy, CA Date Sampled: 10-30-2023 Matrix: Soil Date Received: 10-30-2023
Batch No. for TPH-g: AMJ30-GS1 Date Analyzed: 10-30-2023 Batch No. for TPH-d: BJ30-DS1 Date Analyzed: 10-30-2023 Date Reported: 11-03-2023
EPA 8015M (Total Petroleum Hydrocarbons)
Reporting Unit: mg/kg (ppm)
Sample ID Lab ID
DF
for
TPH-G
C5-C12
TPH-G*
Surrog
Rec.%
TPH-G
DF
for
TPH-D
C13-C23 C24-C40 Surrog
Rec.%
TPH-D
MDL 0.1 1 20
PQL 0.5 5 40
Method Blank 1 ND 86 1 ND ND 85
# 1 A310066-1 1 ND 85 1 6.9 162 89
# 2 A310066-2 1 ND 87 1 33.9 172 92
# 3 A310066-3 1 ND 86 1 6.4 123 91
* Gasoline Range TPH result is obtained from purge and trap analysis using EPA 8260B; DF: Dilution Factor;
MDL: Method Detection Limit;
PQL: Practical Quantitation Limit;
ND: Not Detected (below MDL);
J: Result is between MDL and PQL.;
Note: Surrogate recovery acceptance limits are 70-130%.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 166 of 1214 Page 196 of 1692

ALPHA SCIENTIFIC CORPORATION
Environmental Laboratories
16760 Gridley Road, Cerritos, CA 90703 3 Phone: (562) 809-8880, [email protected] Client: American Integrated Services Lab Job No.: A310066 Date Reported: 11-03-2023 Project: 43172 Matrix: Soil Date Sampled: 10-30-2023
EPA 8260B (VOCs by GC/MS, Page 1 of 2)
Reporting Unit: :g/kg(ppb)
DATE ANALYZED 10-30 10-30-23 10-30-23 10-30-23
DILUTION FACTOR 11 1 1
LAB SAMPLE I.D. MB A310066-1 A310066-2 A310066-3
CLIENT SAMPLE I.D. # 1 # 2 # 2

COMPOUND MDL PQL
Dichlorodifluoromethane 2 5 ND ND ND ND
Chloromethane 2 5 ND ND ND ND
Vinyl Chloride 2 5 ND ND ND ND
Bromomethane 2 5 ND ND ND ND
Chloroethane 2 5 ND ND ND ND
Trichlorofluoromethane 2 5 ND ND ND ND
1,1-Dichloroethene 2 5 ND ND ND ND
Iodomethane 2 5 ND ND ND ND
Methylene Chloride 5 10 ND ND ND ND
trans-1,2-Dichloroethene 2 5 ND ND ND ND
1,1-Dichloroethane 2 5 ND ND ND ND
2,2-Dichloropropane 2 5 ND ND ND ND
cis-1,2-Dichloroethene 2 5 ND ND ND ND
Bromochloromethane 2 5 ND ND ND ND
Chloroform 2 5 ND ND ND ND
1,2-Dichloroethane (EDC) 2 5 ND ND ND ND
1,1,1-Trichloroethane 2 5 ND ND ND ND
Carbon tetrachloride 2 5 ND ND ND ND
1,1-Dichloropropene 2 5 ND ND ND ND
Benzene 1 2 ND ND ND ND
Trichloroethene 2 5 ND ND ND ND
1,2-Dichloropropane 2 5 ND ND ND ND
Bromodichloromethane 2 5 ND ND ND ND
Dibromomethane 2 5 ND ND ND ND
Trans-1,3-Dichloropropene 2 5 ND ND ND ND
cis-1,3-Dichloropropene 2 5 ND ND ND ND
1,1,2-Trichloroethane 2 5 ND ND ND ND
1,3-Dichloropropane 2 5 ND ND ND ND
Dibromochloromethane 2 5 ND ND ND ND
2-Chloroethylvinyl ether 2 10 ND ND ND ND
Bromoform 2 5 ND ND ND ND
Isopropylbenzene 2 5 ND ND ND ND
Bromobenzene 2 5 ND ND ND ND
Toluene 1 2 ND ND ND ND
Cudahy Park Renovation Project, Project # PRE-001 Document Control 167 of 1214 Page 197 of 1692

ALPHA SCIENTIFIC CORPORATION
Environmental Laboratories
16760 Gridley Road, Cerritos, CA 90703 4 Phone: (562) 809-8880, [email protected] Client: American Integrated Services Lab Job No.: A310066 Date Reported: 11-03-2023 Project: 43172 Matrix: Soil Date Sampled: 10-30-2023
EPA 8260B (VOCs by GC/MS, Page 2 of 2) Reporting Unit: ppb COMPOUND MDL PQL MB # 1 # 2 # 2
Tetrachloroethene 2 5 ND ND ND ND
1,2-Dibromoethane(EDB) 2 5 ND ND ND ND
Chlorobenzene 2 5 ND ND ND ND
1,1,1,2-Tetrachloroethane 2 5 ND ND ND ND
Ethylbenzene 1 2 ND ND ND ND
Total Xylenes 1 2 ND ND ND ND
Styrene 2 5 ND ND ND ND
1,1,2,2-Tetrachloroethane 2 5 ND ND ND ND
1,2,3-Trichloropropane 2 5 ND ND ND ND
n-Propylbenzene 2 5 ND ND ND ND
2-Chlorotoluene 2 5 ND ND ND ND
4-Chlorotoluene 2 5 ND ND ND ND
1,3,5-Trimethylbenzene 2 5 ND ND ND ND
tert-Butylbenzene 2 5 ND ND ND ND
1,2,4-Trimethylbenzene 2 5 ND ND ND ND
Sec-Butylbenzene 2 5 ND ND ND ND
1,3-Dichlorobenzene 2 5 ND ND ND ND
p-Isopropyltoluene 2 5 ND ND ND ND
1,4-Dichlorobenzene 2 5 ND ND ND ND
1,2-Dichlorobenzene 2 5 ND ND ND ND
n-Butylbenzene 2 5 ND ND ND ND
1,2,4-Trichlorobenzene 2 5 ND ND ND ND
1,2-Dibromo-3-Chloropropane 2 5 ND ND ND ND
Hexachlorobutadiene 2 5 ND ND ND ND
Naphthalene 2 5 ND ND ND ND
1,2,3-Trichlorobenzene 2 5 ND ND ND ND
Acetone 75 100 ND ND ND ND
2-Butanone (MEK) 50 100 ND ND ND ND
Carbon Disulfide 25 50 ND ND ND ND
4-Methyl-2-pentanone 50 100 ND ND ND ND
2-Hexanone 50 100 ND ND ND ND
Vinyl Acetate 25 50 ND ND ND ND
Ethanol 500 1000 ND ND ND ND
MTBE 2 5 ND ND ND ND
ETBE 2 5 ND ND ND ND
DIPE 2 5 ND ND ND ND
TAME 2 5 ND ND ND ND
TBA 20 50 ND ND ND ND
SURROGATE Accept Limit% %RC %RC %RC %RC
Dibromofluoro-methane 79-126 102 101 102 104
Toluene-d8 79-121 96 99 100 99
Bromofluoro-benzene 71-131 93 92 94 93
MB=Method Blank; MDL=Method Detection Limit; PQL=Practical Quantitation Limit; ND=Not Detected (below DF × MDL); J=Result is between DF × MDL and DF × PQL. m: Matrix interfrence Cudahy Park Renovation Project, Project # PRE-001 Document Control 168 of 1214 Page 198 of 1692

ALPHA SCIENTIFIC CORPORATION
Environmental Laboratories
16760 Gridley Road, Cerritos, CA 90703 5 Phone: (562) 809-8880, [email protected] Client: American Integrated Services Lab Job No.: A310066 Project: 43172
Project Site: 5220 Santa Ana Street, Cudahy, CA Date Sampled: 10-30-2023 Matrix: Soil Date Received: 10-30-2023
Digestion Method: EPA 3050B Date Digested: 10-30-2023
Batch No. for 6010B: 1031-MS1 Date Analyzed: 10-31-2023 Batch No. for 7471A: 1030-HgS1 Date Analyzed: 10-30-2023 Date Reported: 11-03-2023
EPA 6010B/7471A for CAM Metals (TTLC)
Reporting Units: mg/kg (ppm)
Element
EPA Method
Blank
A310066-1 A310066-2 A310066-3 MDL PQL
Method # 1 # 2 # 2
Antimony (Sb) 6010B ND 3.7 15.3 3.3 1 2
Arsenic (As) 6010B ND 1.7 2.0 1.9 0.5 1
Barium (Ba) 6010B ND 183 139 130 1 2
Beryllium (Be) 6010B ND ND ND ND 1 2
Cadmium (Cd) 6010B ND ND ND ND 1 2
Chromium (Cr) 6010B ND 45.5 30.3 15.4 1 2
Cobalt (Co) 6010B ND 11.7 8.5 7.1 1 2
Copper (Cu) 6010B ND 22.7 49.5 28.9 1 2
Lead (Pb) 6010B ND 20.8 595 33.5 1 2
Molybdenum
(Mo) 6010B ND 2.2 2.3 1.3J 1 2
Nickel (Ni) 6010B ND 20.0 25.3 14.5 1 2
Selenium (Se) 6010B ND ND ND ND 0.5 1
Silver (Ag) 6010B ND ND ND ND 1 2
Thallium (Tl) 6010B ND ND ND ND 0.75 1.5
Vanadium (V) 6010B ND 99.8 65.1 54.9 1 2
Zinc (Zn) 6010B ND 183 487 125 1 2
Mercury (Hg) 7471A ND ND ND 0.140J 0.1 0.2
MDL: Method Detection Limit;
PQL: Practical Quantitation Limit;
ND: Not Detected (less than MDL);
J: Result is between MDL and PQL.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 169 of 1214 Page 199 of 1692

ALPHA SCIENTIFIC CORPORATION
Environmental Laboratories
16760 Gridley Road, Cerritos, CA 90703 6 Phone: (562) 809-8880, [email protected] Client: American Integrated Services Lab Job No.: A310066 Project: 43172
Project Site: 5220 Santa Ana Street, Cudahy, CA Date Sampled: 10-30-2023 Matrix: Soil Date Received: 10-30-2023
Batch No.: 1103-MW1 Date Analyzed: 11-03-2023
Date Reported: 11-03-2023
EPA 6010B (Lead, STLC)
Reporting Units: mg/L (ppm)
Sample I.D. Lab ID Lead, STLC MDL PQL
Extraction Blank ND 0.1 0.2
# 2 A310066-2 32.7 0.1 0.2
Note: Sample Preparation: Extraction Procedures, STLC Metals, Title 22, Chapter 11, Appendix II-1, 48 hours (11-01 to 11-03-2023)
MDL: Method Detection Limit;
PQL: Practical Quantitation Limit;
ND: Not Detected (below MDL).

J: Result is between MDL and PQL.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 170 of 1214 Page 200 of 1692

ALPHA SCIENTIFIC CORPORATION
Environmental Laboratories
16760 Gridley Road, Cerritos, CA 90703 7 Phone: (562) 809-8880, [email protected] Client: American Integrated Services Lab Job No.: A310066 Project: 43172
Project Site: 5220 Santa Ana Street, Cudahy, CA Date Sampled: 10-30-2023 Matrix: Soil Date Received: 10-30-2023
Batch No.: 1103-MW1 Date Analyzed: 11-03-2023
Date Reported: 11-03-2023
EPA 6010B (Lead, TCLP)
Reporting Units: mg/L (ppm)
Sample I.D. Lab ID Lead, TCLP MDL PQL
Extraction Blank ND 0.1 0.2
# 2 A310066-2 2.8 0.1 0.2
Note: Sample Preparation: Extraction Procedures, EPA 1311, 18 hours (11-02 to 11-03-2023) MDL: Method Detection Limit;
PQL: Practical Quantitation Limit;
ND: Not Detected (below MDL).

J: Result is between MDL and PQL.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 171 of 1214 Page 201 of 1692

ALPHA SCIENTIFIC CORPORATION
Environmental Laboratories
16760 Gridley Road, Cerritos, CA 90703 8 Phone: (562) 809-8880, [email protected] 11-03-2023
TPH-Gasoline
Batch QA/QC Report
Client: American Integrated Services Lab Job No: A310066 Project: 43172
Matrix: Soil Lab Sample I.D.: A310066-2
Batch No: AMJ30-GS1 Date Analyzed: 10-30-2023
I. MS/MSD Report
Unit: ppb
Analyte Sample
Conc.

Spike
Conc.

MS MSD MS
%Rec.

MSD
%Rec.
% RPD %RPD
Accept.

Limit
%Rec
Accept.

Limit
TPH-g ND 1,000 950 987 95.0 98.7 3.8 30 70-130
II. LCS Result
Unit: ppb
Analyte LCS Value True Value Rec.% Accept. Limit
TPH-g 1,100 1,000 110.0 80-120
ND: Not Detected (at the specified limit).

Cudahy Park Renovation Project, Project # PRE-001 Document Control 172 of 1214 Page 202 of 1692

ALPHA SCIENTIFIC CORPORATION
Environmental Laboratories
16760 Gridley Road, Cerritos, CA 90703 9 Phone: (562) 809-8880, [email protected] 11-03-2023
EPA 8015M (TPH)
Batch QA/QC Report
Client: American Integrated Services Lab Job No: A310066 Project: 43172
Matrix: Soil Lab Sample I.D.: PI310068-1
Batch No: BJ30-DS1 Date Analyzed: 10-30-2023
I. MS/MSD Report
Unit: ppm
Analyte Sample
Conc.

Spike
Conc.

MS MSD MS
%Rec.

MSD
%Rec.
% RPD %RPD
Accept.

Limit
%Rec
Accept.

Limit
TPH-D ND 200 196 210 98.0 105.0 6.9 30 70-130
II. LCS Result
Unit: ppm
Analyte LCS Value True Value Rec.% Accept. Limit
TPH-D 191 200 95.5 80-120
ND: Not Detected (at the specified limit).

Cudahy Park Renovation Project, Project # PRE-001 Document Control 173 of 1214 Page 203 of 1692

ALPHA SCIENTIFIC CORPORATION
Environmental Laboratories
16760 Gridley Road, Cerritos, CA 90703 10 Phone: (562) 809-8880, [email protected] 11-03-2023
EPA 8260B
Batch QA/QC Report
Client: American Integrated Services Lab Job No: A310066 Project: 43172
Matrix: Soil Lab Sample I.D.: PI310068-1
Batch No: 1030-VOAS1 Date Analyzed: 10-30-2023
I. MS/MSD Report
Unit: ppb
Analyte Sample
Conc.

Spike
Conc.

MS MSD MS
%Rec.

MSD
%Rec.
% RPD %RPD
Accept.

Limit
%Rec
Accept.

Limit
1,1-
Dichloroethene
ND 20 16.1 16.6 80.5 83.0 3.1 30 70-130
Benzene ND 20 18.5 19.9 92.5 99.5 7.3 30 70-130
TrichloroetheneND 20 18.1 19.6 90.5 98.0 8.0 30 70-130 Toluene ND 20 18.7 20.8 93.5 104.0 10.6 30 70-130
Chlorobenzene ND 20 18.9 20.1 94.5 100.5 6.2 30 70-130
II. LCS Result
Unit: ppb
Analyte LCS Value True Value Rec.% Accept. Limit
1,1-Dichloroethene 18.9 20.0 94.5 80-120
Benzene 22.4 20.0 112.0 80-120
Trichloro-ethene 22.0 20.0 110.0 80-120
Toluene 22.5 20.0 112.5 80-120
Chlorobenzene 22.3 20.0 111.5 80-120
ND: Not Detected (at the specified limit).

Cudahy Park Renovation Project, Project # PRE-001 Document Control 174 of 1214 Page 204 of 1692

ALPHA SCIENTIFIC CORPORATION
Environmental Laboratories
16760 Gridley Road, Cerritos, CA 90703 11 Phone: (562) 809-8880, [email protected] 11-03-2023
EPA 6010B for Metals (TTLC)
Batch QA/QC Report
Client: American Integrated Services Lab Job No: A310066 Project: 43172
Matrix: Soil Lab Sample I.D.: KM310065-1
Batch No.: 1031-MS1 Date Analyzed: 10-31-2023
I. MS/MSD Report
Unit: ppm
Analyte EPA Method Sample
Conc.

Spike
Conc.

MS
%Rec.

MSD
%Rec.
% RPD %RPD
Accept.

Limit
%Rec
Accept.

Limit
Antimony (Sb) 6010B 2.3 10 104.7 112.0 6.7 30 70-130
Arsenic (As) 6010B 3.1 10 101.2 101.8 0.7 30 70-130
Barium (Ba) 6010B 46.6 10 109.5 111.2 1.5 30 70-130
Beryllium (Be) 6010B ND 10 106.5 106.6 0.1 30 70-130
Cadmium (Cd) 6010B ND 10 102.2 103.8 1.6 30 70-130
Chromium (Cr) 6010B 10.2 10 105.3 101.1 4.1 30 70-130
Cobalt (Co) 6010B 6.2 10 94.0 95.6 1.7 30 70-130
Copper (Cu) 6010B 18.0 10 121.0 117.3 3.1 30 70-130
Lead (Pb) 6010B 4.3 10 117.9 122.3 3.7 30 70-130
Molybdenum
(Mo) 6010B ND 10 91.4 92.9 1.7 30 70-130
Nickel (Ni) 6010B 13.6 10 107.3 109.7 2.2 30 70-130
Selenium (Se) 6010B ND 10 108.7 119.2 9.2 30 70-130
Silver (Ag) 6010B ND 10 94.0 104.8 10.9 30 70-130
Thallium (Tl) 6010B ND 10 84.1 88.6 3.8 30 70-130
Vanadium (V) 6010B 46.0 10 101.4 101.7 0.3 30 70-130
Zinc (Zn) 6010B 49.3 10 113.0 115.3 2.1 30 70-130
ND: Not Detected.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 175 of 1214 Page 205 of 1692

ALPHA SCIENTIFIC CORPORATION
Environmental Laboratories
16760 Gridley Road, Cerritos, CA 90703 12 Phone: (562) 809-8880, [email protected] 11-03-2023
EPA 6010B for Metals
Batch QA/QC Report
Client: American Integrated Services Lab Job No: A310066 Project: 43172
Matrix: Soil Lab Sample I.D.: LCS
Batch No.: 1031-MS1 Date Analyzed: 10-31-2023
II. LCS Result
Unit: ppm
Analyte EPA Method LCS Value True Value Rec.% Accept. Limit Antimony (Sb) 6010B 10.80 10 108.0 80-120
Arsenic (As) 6010B 11.88 10 118.8 80-120
Barium (Ba) 6010B 10.54 10 105.4 80-120
Beryllium (Be) 6010B 10.07 10 100.7 80-120
Cadmium (Cd) 6010B 11.92 10 119.2 80-120
Chromium (Cr) 6010B 10.79 10 107.9 80-120
Cobalt (Co) 6010B 11.52 10 115.2 80-120
Copper (Cu) 6010B 10.17 10 101.7 80-120
Lead (Pb) 6010B 11.14 10 111.4 80-120
Molybdenum
(Mo) 6010B 11.10 10 111.0 80-120
Nickel (Ni) 6010B 10.76 10 107.6 80-120
Selenium (Se) 6010B 10.23 10 102.3 80-120
Silver (Ag) 6010B 10.18 10 101.8 80-120
Thallium (Tl) 6010B 11.93 10 119.3 80-120
Vanadium (V) 6010B 10.11 10 101.1 80-120
Zinc (Zn) 6010B 11.81 10 118.1 80-120
ND:Not Detected (at the specified limit).

Cudahy Park Renovation Project, Project # PRE-001 Document Control 176 of 1214 Page 206 of 1692

ALPHA SCIENTIFIC CORPORATION
Environmental Laboratories
16760 Gridley Road, Cerritos, CA 90703 13 Phone: (562) 809-8880, [email protected] 11-03-2023
EPA 7471A (Mercury)
Batch QA/QC Report
Client: American Integrated Services Lab Job No: A310066 Project: 43172
Matrix: Soil Lab Sample I.D.: A310066-1
Batch No.: 1030-HgS1 Date Analyzed: 10-30-2023
I. MS/MSD Report
Unit: ppm
Analyte EPA
Method
Sample
Conc.

Spike
Conc.

MS
%Rec.

MSD
%Rec.
% RPD %RPD
Accept.

Limit
%Rec
Accept.

Limit
Mercury (Hg) 7471A ND 0.25 97.8 98.1 0.3 30 70-130
II. LCS Result
Unit: ppm
Analyte EPA Method LCS Value True Value Rec.% Accept. Limit Mercury (Hg) 7471A 0.248 0.25 99.2 80-120
ND: Not Detected (at the specified limit).

Cudahy Park Renovation Project, Project # PRE-001 Document Control 177 of 1214 Page 207 of 1692

ALPHA SCIENTIFIC CORPORATION
Environmental Laboratories
16760 Gridley Road, Cerritos, CA 90703 14 Phone: (562) 809-8880, [email protected] 11-03-2023
EPA 6010B (Pb)
Batch QA/QC Report
Client: American Integrated Services Lab Job No.: A310066 Project: 43172
Matrix: Soil Lab Sample I.D.: CT311008-7
Batch No.: 1103-MW1 Date Analyzed: 11-03-2023
I. MS/MSD Report
Unit: ppm
Analyte EPA
Method
Sample
Conc.

Spike
Conc.

MS
%Rec.

MSD
%Rec.
% RPD %RPD
Accept.

Limit
%Rec
Accept.

Limit
Lead (Pb) 6010B ND 0.1 96.3 95.1 1.3 30 70-130
II. LCS Result
Unit: ppm
Analyte EPA Method LCS Value True Value Rec.% Accept. Limit Lead (Pb) 6010B 0.1196 0.1 119.6 80-120
ND: Not Detected (at the specified limit).

Cudahy Park Renovation Project, Project # PRE-001 Document Control 178 of 1214 Page 208 of 1692 Cudahy Park Renovation Project, Project # PRE-001 Document Control 179 of 1214 Page 209 of 1692 Cudahy Park Renovation Project, Project # PRE-001 Document Control 180 of 1214 Page 210 of 1692 Updated Draft Geotechnical Investigation Report
Cudahy Park Renovations
Cudahy, California
Willdan Project No. 112093-4000
September 27, 2024
19 APPENDIX C. SEISMIC DESIGN PARAMETERS PER ASCE 7-16
Cudahy Park Renovation Project, Project # PRE-001 Document Control 181 of 1214 Page 211 of 1692 ASCE 7 Hazards Report
Address:

No Address at This Location
Standard: ASCE/SEI 7-16 Latitude: 33.958814
Risk Category: II Longitude: -118.173908
Soil Class: D - Default (see
Section 11.4.3)
Elevation: 116.44433862123184 ft
(NAVD 88)
https://asce7hazardtool.online/ Page 1 of 3 Thu Dec 14 2023 Cudahy Park Renovation Project, Project # PRE-001 Document Control 182 of 1214 Page 212 of 1692 SS : 1.752
S1 : 0.625
Fa : 1.2
Fv : N/A
SMS : 2.102
SM1 : N/A
SDS : 1.401
SD1 : N/A
TL : 8
PGA : 0.749
PGA M : 0.899
FPGA : 1.2
Ie : 1
Cv : 1.45
Seismic
Site Soil Class:

Results:

Data Accessed:

Date Source:

D - Default (see Section 11.4.3)
USGS Seismic Design Maps
Ground motion hazard analysis may be required. See ASCE/SEI 7-16 Section 11.4.8.

Thu Dec 14 2023
https://asce7hazardtool.online/ Page 2 of 3 Thu Dec 14 2023 Cudahy Park Renovation Project, Project # PRE-001 Document Control 183 of 1214 Page 213 of 1692 The ASCE 7 Hazard Tool is provided for your convenience, for informational purposes only, and is provided “as is” and without warranties of any kind. The location data included herein has been obtained from information developed, produced, and maintained by third party providers; or has been extrapolated from maps incorporated in the ASCE 7 standard. While ASCE has made every effort to use data obtained from reliable sources or methodologies, ASCE does not make any representations or warranties as to the accuracy, completeness, reliability, currency, or quality of any data provided herein. Any third-party links provided by this Tool should not be construed as an endorsement, affiliation, relationship, or sponsorship of such third-party content by or from ASCE.

ASCE does not intend, nor should anyone interpret, the results provided by this Tool to replace the sound judgment of a competent professional, having knowledge and experience in the appropriate field(s) of practice, nor to substitute for the standard of care required of such professionals in interpreting and applying the contents of this Tool or the ASCE 7 standard.

In using this Tool, you expressly assume all risks associated with your use. Under no circumstances shall ASCE or its officers, directors, employees, members, affiliates, or agents be liable to you or any other person for any direct, indirect, special, incidental, or consequential damages arising from or related to your use of, or reliance on, the Tool or any information obtained therein. To the fullest extent permitted by law, you agree to release and hold harmless ASCE from any and all liability of any nature arising out of or resulting from any use of data provided by the ASCE 7 Hazard Tool.
https://asce7hazardtool.online/ Page 3 of 3 Thu Dec 14 2023 Cudahy Park Renovation Project, Project # PRE-001 Document Control 184 of 1214 Page 214 of 1692 ASCE 7 Hazards Report
Address:

No Address at This Location
Standard: ASCE/SEI 7-22 Latitude: 33.958814
Risk Category: II Longitude: -118.173908
Soil Class: D - Stiff Soil Elevation: 116.44433862123184 ft (NAVD 88)
https://asce7hazardtool.online/ Page 1 of 4 Thu Dec 14 2023 Cudahy Park Renovation Project, Project # PRE-001 Document Control 185 of 1214 Page 215 of 1692 PGA M : 0.79
SMS : 2.09
SM1 : 1.73
SDS : 1.39
SD1 : 1.15
TL : 8
SS : 2
S1 : 0.82
VS30 : 260
Seismic Design Category: E
Multi-Period Design Spectrum
S (g) vs T(s) a
Multi-Period MCE Spectrum R
S (g) vs T(s) a
Two-Period Design Spectrum
S (g) vs T(s) a
Two-Period MCE Spectrum R
S (g) vs T(s) a
Design Vertical Response Spectrum
Vertical ground motion data has not yet been made
available by USGS.

MCE Vertical Response Spectrum R
Vertical ground motion data has not yet been made
available by USGS.

Seismic
Site Soil Class: D - Stiff Soil
Results:
https://asce7hazardtool.online/ Page 2 of 4 Thu Dec 14 2023 Cudahy Park Renovation Project, Project # PRE-001 Document Control 186 of 1214 Page 216 of 1692 Data Accessed: Thu Dec 14 2023
Date Source:

USGS Seismic Design Maps based on ASCE/SEI 7-22 and ASCE/SEI 7-22 Table 1.5-2. Additional data for site-specific ground motion procedures in accordance with ASCE/SEI 7-22 Ch. 21 are available from USGS. https://asce7hazardtool.online/ Page 3 of 4 Thu Dec 14 2023 Cudahy Park Renovation Project, Project # PRE-001 Document Control 187 of 1214 Page 217 of 1692 The ASCE 7 Hazard Tool is provided for your convenience, for informational purposes only, and is provided “as is” and without warranties of any kind. The location data included herein has been obtained from information developed, produced, and maintained by third party providers; or has been extrapolated from maps incorporated in the ASCE 7 standard. While ASCE has made every effort to use data obtained from reliable sources or methodologies, ASCE does not make any representations or warranties as to the accuracy, completeness, reliability, currency, or quality of any data provided herein. Any third-party links provided by this Tool should not be construed as an endorsement, affiliation, relationship, or sponsorship of such third-party content by or from ASCE.

ASCE does not intend, nor should anyone interpret, the results provided by this Tool to replace the sound judgment of a competent professional, having knowledge and experience in the appropriate field(s) of practice, nor to substitute for the standard of care required of such professionals in interpreting and applying the contents of this Tool or the ASCE 7 standard.

In using this Tool, you expressly assume all risks associated with your use. Under no circumstances shall ASCE or its officers, directors, employees, members, affiliates, or agents be liable to you or any other person for any direct, indirect, special, incidental, or consequential damages arising from or related to your use of, or reliance on, the Tool or any information obtained therein. To the fullest extent permitted by law, you agree to release and hold harmless ASCE from any and all liability of any nature arising out of or resulting from any use of data provided by the ASCE 7 Hazard Tool.
https://asce7hazardtool.online/ Page 4 of 4 Thu Dec 14 2023 Cudahy Park Renovation Project, Project # PRE-001 Document Control 188 of 1214 Page 218 of 1692 Updated Draft Geotechnical Investigation Report
Cudahy Park Renovations
Cudahy, California
Willdan Project No. 112093-4000
September 27, 2024
20 APPENDIX D. PERCOLATION TEST RESULTS
Cudahy Park Renovation Project, Project # PRE-001 Document Control 189 of 1214 Page 219 of 1692 Percolation Testing Cudahy Park Renovations, Cudahy, California Boring/Test No.: P-1 112093-4000 Depth of Boring, db (ft): 5.00
See Figure 1 Diameter of Boring, Db (in): 8 Section Area of Boring, Ab (in2): 50.27
Tested by: RMC Date Tested: Diameter of Pipe, Dp (in): 3 Section Area of Pipe, Ap (in2): 7.07
Void Ratio of Filter Pack Gravel, n: 0.40 Correction Factor = Ab/[Ap+n(Ab-Ap)], CF: 2.06 Water Table Depth (ft): -
Initial Depth to Water, d1 (ft): 0.30
ΔT = T2 - T1 d1 d2 dH1 = db - d1 dH2 = db - d2 ΔdH = dH1 - dH2 davg =
(dH1+dH2)/2
Vu = ΔdH *
πDb
2 /4
Vc = Vu / CF A = πD2
/4 +
πD*davg
K = Vc / (A*ΔT)
(min) (ft) (ft) (in) (in) (in) (in) (in3
) (in3) (in2) (in/hr)
1 15 0.30 0.65 56.40 52.20 4.20 54.30 211.12 102.48 1414.97 0.29 2 15 0.65 0.97 52.20 48.36 3.84 50.28 193.02 93.70 1313.94 0.29 3 15 0.97 1.29 48.36 44.52 3.84 46.44 193.02 93.70 1217.43 0.31 4 15 1.29 1.52 44.52 41.76 2.76 43.14 138.73 67.35 1134.49 0.24 5 15 1.52 1.75 41.76 39.00 2.76 40.38 138.73 67.35 1065.13 0.25 6 15 1.75 1.97 39.00 36.36 2.64 37.68 132.70 64.42 997.27 0.26 7 15 1.97 2.19 36.36 33.72 2.64 35.04 132.70 64.42 930.92 0.28

0.26 in/hr
Boring Percolation Testing (based on GS200.2, 6/30/17)
Project Name:

Project No.:

Project Location:
10/17/2023
Measured
Percolation
Rate
Reading
No.

Water Level Measurement Water Level Calculations Percolation Rate Calculations Time Interval Initial Depth to
Water
Final Depth to
Water
Initial Height of
Water Colum
Final Height of
Water Column Drop in Height
Measured Percolation Rate =
Average Height
of Water
Column
Volume of
Water
Discharged
Uncoorected
Volume of
Water
Discharged
Corrected
Percolation
Area
Cudahy Park Renovation Project, Project # PRE-001 Document Control 190 of 1214 Page 220 of 1692 Converse Consultants
Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services 717 South Myrtle Avenue, Monrovia, California 91016
Telephone: (626) 930-1200 ♦ Facsimile: (626) 930-1212 ♦ www.converseconsultants.com October 24, 2024
Mr. Tyrone Peter, PE
Willdan
2401 East Katella Avenue, Suite 300
Anaheim, California 92806
Subject: SOIL SAMPLING WORKPLAN
Cudahy Park Renovation Project
5220 Santa Ana Street
Cudahy, California
Converse Project No. 24-41-114-01
Mr. Peter:

Converse Consultants (Converse) appreciates this opportunity to present our Soil Sampling Workplan for supplemental soil sampling activities to be completed at Cudahy Park. Our Workplan is based upon our Proposal dated March 29, 2024.

PROJECT DESCRIPTION AND BACKGROUND
The Cudahy Park Renovation Project focuses on parkwide renovation improvements such as renovating basketball, baseball, tennis courts, as well as the playground and skate park. Additions to the park include a community stage, splash pad, exercise equipment, picnic area, and shade structures. During the course of a geotechnical investigation completed as part of the renovation project, three (3) geotechnical borings (B-1, B-2, and P-1) were advanced at locations across the project area. Borings B-1 and B-2 were advanced to depths of 20-feet below ground surface (bgs) while boring P-1 was advanced to a depth of 5-feet bgs.

Converse has reviewed the analytical results of the composite soil samples collected from soil cuttings generated during the geotechnical investigation. The data indicates that the reported concentration of total lead in waste profile sample #2 (associated with boring B2, located near the baseball fields) exceed screening levels for residential and commercial uses, and therefore should ideally be removed from this park site where children could be exposed to it. The soluble levels of lead in this sample would result in the soil from that location needing to be classified as non-RCRA California Hazardous Waste for handling and disposal purposes.

The results for the other samples analyzed indicate that soils from those areas are less than screening level concentrations and should therefore be acceptable for reuse onsite.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 191 of 1214 Page 221 of 1692 Willdan
Soil Sampling Workplan
Cudahy Park Renovation Project
October 24, 2024
Copyright 2024 Converse Consultants
Converse Project No. 24-41-114-01 2

SCOPE OF WORK
Task 1 – Pre-field Activities
An initial site visit to inspect the site and conduct a required USA (Dig Alert) mark-out will be conducted. Converse will notify Underground Service Alert 72 hours prior to conducting sampling activities.

A boring permit was obtained from the County of Los Angeles Department of Public Health, Environmental Health Protection Division, Drinking Water Program (See Appendix A).

Additionally, Converse has prepared a site-specific Health & Safety Plan (See Appendix B).

Task 2 – Soil Sampling
Proposed field activities include the advancement of up to eight (8) borings. Seven (7) borings are proposed to be advanced to maximum depths of 8-feet bgs. One (1) boring, in the vicinity of geotechnical boring B-2, is proposed to be advanced to a depth of 20- feet bgs. Proposed boring locations are presented on Figure 1.

Soil borings are to be advanced using direct-push drilling methods. Soil samples are proposed to be collected from each boring at depths of 1, 2, 4, 6, and 8-feet bgs, with additional samples collected from the deeper 20-foot boring at depths of 12, 16, and 20- feet bgs.

Dry decontamination of drilling and sampling equipment will be conducted between boring locations (e.g. Simple Green and paper towel wipe down). Shallow boreholes may be backfilled with commercially available sand, or hydrated bentonite. The deep boring will be backfilled with cement slurry grout, placed using a tremie pipe, in accordance with the requirements of the terms of the permit. Soil conditions will be documented utilizing a boring log format.

All excess soils generated from the drilling and sample collection activities will be contained in a 55-gallon drum. A composite sample will be collected from the drum to generate a waste profile sample. The drum will be temporarily stored onsite until the results of the profile sample are received. The drum will be picked up later and transported to an appropriate facility for disposal.

Task 3 – Laboratory Analysis

Soil samples will be submitted to an ELAP-accredited laboratory for analysis. Initially, soil samples collected from depths of 1.0 and 2.0-feet bgs from each of the eight (8) borings (16 total samples) will be analyzed on a standard turnaround time (7-10 business Cudahy Park Renovation Project, Project # PRE-001 Document Control 192 of 1214 Page 222 of 1692 Willdan
Soil Sampling Workplan
Cudahy Park Renovation Project
October 24, 2024
Copyright 2024 Converse Consultants
Converse Project No. 24-41-114-01 3
days) in accordance with Environmental Protection Agency (EPA) Test Method 6010 for Total Threshold Limit Concentration (TTLC) lead. All remaining samples will be archived pending the results of the initial samples analyses.

The composite sample collected from the drum will be analyzed for constituents necessary to develop a waste profile. It is anticipated that this sample will be analyzed for metals, VOCs, and hydrocarbons in accordance with EPA Methods 6010/7471, 8260B, and 8015M, respectively.

Task 4 – Reporting
A summary report will be prepared following completion of field activities and receipt of analytical results. Included in the report will be a summary of the fieldwork and methodologies, as well as a discussion and summary of the analytical results. Converse will also present our conclusions and recommendations, if any. Copies of summary tables of sample analytical results, and laboratory analytical reports with chain of custody documentation will be provided in the report. The report will be signed by a California Professional Geologist (PG).

SCHEDULE
The soil sampling is estimated to be completed in one (1) day, and it can commence approximately three (3) days after the site is marked for USA utility clearance.

Laboratory analyses will be conducted on a standard 7 to 10 business day turnaround.

The draft summary report will be presented within two (2) weeks following the receipt of final analytical results.

CLOSURE
Thank you for the opportunity to be of assistance. If you should have any questions regarding this Soil Sampling Workplan, please do not hesitate to contact Spencer Wagner at (562) 505-5219 or Michael Van Fleet at (626) 930-1267.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 193 of 1214 Page 223 of 1692 Willdan
Soil Sampling Workplan
Cudahy Park Renovation Project
October 24, 2024
Copyright 2024 Converse Consultants
Converse Project No. 24-41-114-01 4

CONVERSE CONSULTANTS
Spencer Wagner Michael Van Fleet, PG
Project Environmental Scientist Senior Geologist
Encl: Appendix A – LA County Boring Permit
Appendix B – HASP
Figure 1 – Proposed Boring Location Map
Cudahy Park Renovation Project, Project # PRE-001 Document Control 194 of 1214 Page 224 of 1692 Willdan
Soil Sampling Workplan
Cudahy Park Renovation Project
October 24, 2024
Copyright 2024 Converse Consultants
Converse Project No. 24-41-114-01 5
APPENDIX A – LA COUNTY DRILLING PERMIT
Cudahy Park Renovation Project, Project # PRE-001 Document Control 195 of 1214 Page 225 of 1692

ENVIRONMENTAL HEALTH
Drinking Water Program
5050 Commerce Drive, Baldwin Park, CA 91706
Telephone: (626) 430-5420 • Facsimile: (626) 813-3013 • Email: [email protected] http://publichealth.lacounty.gov/eh/ep/dw/dw_main.htm
Work Plan Approval

WORK SITE ADDRESS CITY ZIP EMAIL ADDRESS FOR WELL PERMIT APPROVAL 5220 Santa Ana Street Cudahy 90201 [email protected] NOTICE:
• WORK PLAN APPROVALS ONCE GRANTED, ARE VALID FOR 180 DAYS. 30 DAY EXTENSIONS OF WORK PLAN APPROVALS ARE CONSIDERED ON AN INDIVIDUAL (CASE-BY-CASE) BASIS AND MAY BE SUBJECT TO ADDITIONAL PLAN REVIEW FEES (HOURLY RATE AS APPLICABLE). • WORK PLAN MODIFICATIONS MAY BE REQUIRED IF WELL AND GEOLOGIC CONDITIONS ENCOUNTERED AT THE SITE INSPECTION ARE FOUND TO DIFFER FROM THE SCOPE OF WORK PRESENTED TO THE DEPARTMENT OF PUBLIC HEALTH—DRINKING WATER PROGRAM. • POTENTIAL APPROVALS ARE LIMITED TO COMPLIANCE WITH THE CALIFORNIA WELL STANDARDS AND THE LOS ANGELES COUNTY CODE AND DOES NOT GRANT ANY RIGHTS TO CONSTRUCT, RENOVATE, OR DECOMMISSION ANY WELL. THE APPLICANT IS RESPONSIBLE FOR SECURING ALL OTHER

NECESSARY PERMITS SUCH AS WATER RIGHTS, PROPERTY RIGHTS, COASTAL COMMISSION OR WATERMASTER APPROVALS, USE COVENANTS, ENCROACHMENT PERMISSIONS, UTILITY LINE SETBACKS, CITY/COUNTY PUBLIC WORKS RIGHTS OF WAY, ETC. • THIS PERMIT IS NOT COMPLETE UNTIL ALL OF THE FOLLOWING REQUIREMENTS ARE SIGNED BY THE DEPUTY HEALTH OFFICER. WORK SHALL NOT BE INITIATED WITHOUT A WORK PLAN APPROVAL STAMPED BY THE DEPARTMENT OF PUBLIC HEALTH—DRINKING WATER PROGRAM.

TO BE COMPLETED BY DEPARTMENT OF PUBLIC HEALTH—DRINKING WATER PROGRAM:
□ ANNULAR SEAL FINAL INSPECTION REQUIRED □ WELL COMPLETION LOG REQUIRED ✔ WORK PLAN APPROVED FOR:
1 Soil Boring/Exp. Hole
PERMIT
NUMBER: SR0392540 DATE: October 23, 2024
ADDITIONAL APPROVAL CONDITIONS: October 23, 2024
• Work plan approval is issued for scope of work submitted to the Drinking Water Program. Any modifications to the scope of work will require an additional work plan review.
• Ensure the borings/exploration holes are backfilled within 24 hours of boring construction. • Ensure to backfill using a tremie pipe under pressure or equivalent equipment with approved cement grout, proceeding upward from the bottom of the boring/exploration hole to surface. • Ensure soil borings are sealed per California Well Standards (Bulletins 74-81 and 74-90) o Cement grout mix ratio of 5-6 gallons of water per 94-pound bag of Portland cement. o Up to 6% of Bentonite may be added to the cement-based mix. o No hydrated Bentonite chips and/or soil cuttings.
• Borings/Exploration holes must comply with all applicable requirements published in the California Well Standards (Bulletins 74-81 and 74-90) and the Los Angeles County Code, Title 11.

Please note: We no longer allow soil vapor probes to be installed into ground water sample borings or borings that extend into ground water. Follow the Advisory Active Soil Gas Investigations July 2015: Cal EPA, DTSC, LA RWQCB and San Francisco RWQCB for vapor probe borings. We do not permit percolation test borings or soil vapor probe installations in the vadose zone.

APPROVED BY:

REHS NO. 7869
Date Accepted: REHS Signature: Date Accepted: REHS Signature:

Delisa Dabney
REHS Environmental Health Specialist Ill
Drinking Water Program
Environmental Health Protection Division
Los Angeles County Department of Public Health
5050 Commerce Drive
Baldwin Park, CA 91706
Ph (213) 761 - 0729
[email protected]
Cudahy Park Renovation Project, Project # PRE-001 Document Control 196 of 1214 Page 226 of 1692 Willdan
Soil Sampling Workplan
Cudahy Park Renovation Project
October 24, 2024
Copyright 2024 Converse Consultants
Converse Project No. 24-41-114-01 6
APPENDIX B – HEALTH AND SAFETY PLAN
Cudahy Park Renovation Project, Project # PRE-001 Document Control 197 of 1214 Page 227 of 1692 Site Safety and Health Plan
CLIENT: Willdan
CLIENT CONTACT: Mr. Tyrone Peter, PE
PHONE #: (626) 223-8557
CONVERSE PROJECT NO: 24-41-114-01
SITE NAME: Cudahy Park Renovation Project
SITE ADDRESS: 5220 Santa Ana Street
Cudahy, CA
SITE CONTACT: Mr. Tyrone Peter, PE
PHONE #: (626) 223-8557
DATE: October 24, 2024
SITE SPECIFIC HASP EXPIRATION: October 24, 2025
PRINCIPAL: Norman Eke
PROJECT MANAGER: Michael Van Fleet
FIELD PERSONNEL Scott Morgan
Spencer Wagner
SUBCONTRACTOR(S): Interphase Environmental/Jones Environmental

DISCLAIMER
This Site Health and Safety Plan has been written for the use of Converse Consultants (Converse) and its employees. It may also be used as a guidance document by properly trained and experienced Converse subcontractors. However, Converse does not guarantee the health or safety of any person entering this site.

Due to the nature of this site and the activity occurring thereon, it is not possible to discover, evaluate, and provide protection for all possible hazards which may be encountered. Strict adherence to the health and safety guidelines set forth herein will reduce, but not eliminate, the potential for injury on the site. The health and safety guidelines in this plan were prepared specifically for this site and should not be used on any other site without prior research by trained health and safety specialists.

All personnel participating in the field must be trained in the general and specific hazards unique to the job and, if applicable, participate in a medical surveillance program.

Converse claims no responsibility for use of this plan by others. The plan is written for the specific site conditions, purposes, dates, and personnel specified and must be amended if these conditions change.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 198 of 1214 Page 228 of 1692 Converse Project No. 24-41-114-01 2
Copyright 2024 Converse Consultants
I. Site History and Project Information
A) Site Description:

Site is a currently occupied by Cudahy Park and the project area is located within the baseball field portion of the park. Project scope is to conduct soil sampling via direct push drilling.

B) Site Abandoned or Occupied?
Occupied.

C) Site Map Attached with the Following Designation:

Figure 1
D) Background Information:

The Cudahy Park Renovation Project focuses on parkwide renovation improvements such as renovating basketball, baseball, tennis courts, as well as the playground and skate park. Additions to the park include a community stage, splash pad, exercise equipment, picnic area, and shade structures. During the course of a geotechnical investigation completed as part of the renovation project, three (3) geotechnical borings (B-1, B-2, and P-1) were advanced at locations across the project area. Borings B-1 and B-2 were advanced to depths of 20-feet bgs while boring P-1 was advanced to a depth of 5-feet bgs.

Analytical results of the composite soil samples collected from soil cuttings generated during the geotechnical investigation indicated that the reported concentration of total lead in waste profile sample #2 (associated with boring B-2, located near the baseball fields) exceeds screening levels for residential and commercial uses. The soluble levels of lead in this sample would result in the soil from that location needing to be classified as non-RCRA California Hazardous Waste for handling and disposal purposes. The results for the other samples analyzed indicate that soils from those areas are less than screening level concentrations and should therefore be acceptable for reuse onsite.

E) Levels of Contamination Found:

The chemical of concern is lead.

F) Scope of Work:

Advance 7 borings to 8-feet bgs and 1 boring to 20 feet bgs to collect soil.

G) Written Work Plan: YES _ _X__ NO ___

Cudahy Park Renovation Project, Project # PRE-001 Document Control 199 of 1214 Page 229 of 1692 Converse Project No. 24-41-114-01 3
Copyright 2024 Converse Consultants
H) Project Crew:

Project Manager:..........................................................................Michael Van Fleet Geologist:.....................................................................................Michael Van Fleet Field Supervisor & Site Safety Officer: ................................................Scott Morgan Cudahy Park Renovation Project, Project # PRE-001 Document Control 200 of 1214 Page 230 of 1692 Converse Project No. 24-41-114-01 4
Copyright 2024 Converse Consultants
II. Health Risk Analysis
A) Job Tasks to be Performed:

Conduct environmental borings using direct-push (Geoprobe) drill rig to collect soil samples.

B) Summary of Potential Exposure Conditions, Pathways, Chemical Hazards and Physical Hazards:

See Table 1.

C) Chemical Hazard Data
See Table 2.

D) Physical and Non-Chemical Hazards
See Tables 3.

E) Overall Rating of Risk due to Project Hazards.

Serious Moderate Low
F) Utility Clearance: Underground Service Alert (USA) clearance of utility lines was called in. Site marked prior to USA ticket submission.

III. Air Monitoring Equipment/Personal Protective Equipment and Action Levels Monitoring is to be conducted by the Site Safety Officer (SSO) or designee. The results shall be interpreted by the SSO.

All monitoring shall be performed on a periodic basis. "Periodic" is defined as adequate characterization before, during, and after each task/activity. Monitoring should continue on a continuous basis until the operation is stable and the SSO or project manager feels that the monitoring is sufficient to adequately assess and characterize exposure during that operation. Additional characterization monitoring shall begin immediately if the operation destabilizes, the environment changes, or the potential for exposure is otherwise affected.

A) Monitoring Instruments/Direct Reading Instruments.

VOCs - PID (performed initially and periodically);
B) Personal Protective Equipment and Action Levels; See Table 4.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 201 of 1214 Page 231 of 1692 Converse Project No. 24-41-114-01 5
Copyright 2024 Converse Consultants
IV. Decontamination/Hazardous Waste Generation
A) Sampling Equipment Decontamination
All soil samples will be collected using new acetate sleeves, therefore cross contamination is not a significant concern. Samples will be collected with disposable nitrile gloves and any reusable equipment will be decontaminated prior to collection of subsequent samples.

B) Personal Protective Equipment (PPE)
- Nitrile gloves when handling samples or sampling equipment - Hardhat
- Safety Vest
- Steel-toed boots
- Safety Glasses
C) Heavy Equipment
- Geoprobe drill rig
- Drill rig trailer and/or support truck
D) Hazardous Waste Generation
1) Based on the results of prior assessment activities at the Site, it is anticipated that soil cuttings from the drilling activities may contain soluble lead concentrations that would exceed hazardous waste thresholds. Therefor, all excess soils will be contained in a 55-gallon drum, and a waste profile sample will be collected to determine if the soils need to be handled and disposed of as a hazardous waste.

V. Site Access Procedure
On-Site Command Post:......................................Converse truck or Private vehicle Work Area Access: ............................................ Santa Ana Street, and River Road Security for Off-Hours: .........................................................................Not Provided VI. Emergency Procedures:

FIRST AID
Eye:................................................................................................................. Wash Skin:..........................................................................................Irrigate Immediately Breathing: .........................................Artificial Respiration - Seek Medical Attention Cudahy Park Renovation Project, Project # PRE-001 Document Control 202 of 1214 Page 232 of 1692 Converse Project No. 24-41-114-01 6
Copyright 2024 Converse Consultants
ONSITE TELEPHONE:............................................... (909) 374-2652 - Cell Phone EMERGENCY PHONE NUMBERS:

Fire 911
Ambulance 911
Police 911
EMERGENCY HOSPITAL: St. Francis Medical Center
Telephone No.: (310) 900-8900
Address: 3630 E. Imperial Highway
Lynwood, CA 90262

MAP ATTACHED WITH ROUTE HIGHLIGHTED

OTHER TELEPHONE NUMBERS
Onsite Cellular: Scott Morgan (909) 374-2652
Converse Office: (626) 930-1200
Senior Geologist Michael Van Fleet (626) 524-9320
VII. Plan Approval/Sign Off/Log Sheet/Tail Gate Meetings A) Plan Reviewed by: Michael Van Fleet
B) The following team members have read this plan before entering the Site:

PRINT NAME SIGNATURE DATE
Cudahy Park Renovation Project, Project # PRE-001 Document Control 203 of 1214 Page 233 of 1692 Converse Project No. 24-41-114-01 7
Copyright 2024 Converse Consultants
C) Daily Tail Gate Meeting
Fill out On-site Safety Meeting Form
Cudahy Park Renovation Project, Project # PRE-001 Document Control 204 of 1214 Page 234 of 1692 Converse Project No. 24-41-114-01 8
Copyright 2024 Converse Consultants
TABLE NO. 1

TASK RISK ANALYSIS AND SUMMARY OF

MEDIA OF CONCERN, POTENTIAL EXPOSURE PATHWAYS, PHYSICAL HAZARDS AND RISK RATINGS TASKS

SCHEDULED

MEDIA OF

CONCERN

POTENTIAL

EXPOSURE PATHWAYS

PHYSICAL

HAZARDS
RISK
RATING
Utility Clearance Soil Inhalation, Skin Utilities, explosion, fire, Low Drilling and Sampling Soil Inhalation, Skin Noise, utilities, explosion, fire, equipment Moderate
Decontamination Soil, Water Inhalation, Skin Equipment Low Cudahy Park Renovation Project, Project # PRE-001 Document Control 205 of 1214 Page 235 of 1692 Converse Project No. 24-41-114-01 9
Copyright 2024 Converse Consultants
TABLE NO. 2

EXPOSURE LIMITS
COMPOUND CAS No. 8-hr TWA
(ppm)
STEL
(ppm)
IDLH
(ppm)
TPH gasoline 8006619 300 500 -----
Benzene 71432 1.0 5.0 500
Ethylbenzene 100414 100 125 800
Toluene 108883 50 150 500
Xylenes 1330207 100 150 900
Methyl-tert-butyl ether 1634044 40 ----- -----
1,2-dichloroethane
(Ethylene dichloride) 107062 1 2 50
Tetrachloroethylene 127184 25 100 150
Trichloroethene 79016 25 100 1,000
Antimony 29191524 0.5 mg Sb/m3 ----- 50 mg Sb/m3
Arsenic 7440382 0.01 mg As/m3 ----- 5 mg As/m3
Barium 7440393 0.5 mg Ba/m3 ----- 50 mg Ba/m3
Beryllium 7440417 0.0002 mg Be/m3 ----- 4 mg Be/m3
Cadmium 7440439 0.005 mg Cd/m3 ----- 9 mg Cd/m3
Chromium III 7440473 0.5 mg Cr/m3 ----- 25 mg Cr/m3
Cobalt 7440484 0.2 mg Co/m3 ----- 9 mg Co/m3
Copper 7440473 0.5 mg Cu/m3 ----- 25 mg Cu/m3
Lead (metallic) 7758976 0.05 mg Pb/m3 ----- 100 mg Pb/m3 Mercury 7439976 0.025 mg Hg/m3 0.03 mg Hg/m3 10 mg Hg/m3 Molybdenum 7439987 3 mg Mo/m3 ----- 5,000 mg Mo/m3
Nickel 7440020 0.01 mg Ni/m3 ----- 10 mg Ni/m3
Selenium 7483791 0.2 mg Se/m3 ----- 1 mg Se/m3
Silver 7440224 0.01 mg Ag/m3 ----- 10 mg Ag/m3
Thallium (soluble) 0.1 mg Tl/m3 ----- 15 mg Tl/m3
Vanadium pentoxide 1314621 0.05 mg/m3 ----- 35 mg/m3
Zinc chromate, oxide 13530659,
1314132 0.005 mg Zn/m3 ----- 5,000 mg Zn/m3
ppm parts per million
mg/m3 milligrams per cubic meter
Cudahy Park Renovation Project, Project # PRE-001 Document Control 206 of 1214 Page 236 of 1692 Converse Project No. 24-41-114-01 10
Copyright 2024 Converse Consultants
TABLE NO. 3

POSSIBLE PHYSICAL AND NON-CHEMICAL HAZARDS

HAZARD PRESENT ABSENT
Holes/trenches/ditches X
Steep grades X
Slippery/wet surfaces X
Uneven terrain X
Unstable surfaces X
Elevated work area X
Lifting/moving heavy
objects
X
Shoring/scaffolding X
Fire hazards X
Overhead power lines X
Underground power lines X
Aboveground oil pipes X
Underground oil pipes X
Gas lines X
Explosive atmospheres X
Oxygen deficiency X
Confined spaces X
Drilling X
Excavation X
Machinery X
Heat exposure X
Cold exposure X
Noise X
Ionizing radiation X
Infrared X
Lasers X
Ultraviolet X
Biological X
Other - Street Vehicles X
Cudahy Park Renovation Project, Project # PRE-001 Document Control 207 of 1214 Page 237 of 1692 Converse Project No. 24-41-114-01 11
Copyright 2024 Converse Consultants
TABLE NO. 4

TASK-SPECIFIC PERSONAL PROTECTIVE EQUIPMENT (PPE)

AND ACTION LEVELS
PPE
LEVEL
TASK
ACTIVITYa

ACTION LEVEL

FOR PPE

UPGRADE

FOR ANY

CONTAMINANT
SUIT GLOVE FOOTb HEADc EYEd EAR RESPIRATORe RESPIRATOR
CARTRIDGEf

MONITORING
EQUIPMENTg
D ALL <5 ppm PID N/A Nitrile ST HH SG Ear Plugs
during GP

N/A N/A PID
C ALL 5 to 100 ppm PID Tyvek Nitrile ST HH SG Ear Plugs during GP

HF/APR OC/PART PID
Stop Work ALL >100ppm PID N/A N/A N/A N/A N/A N/A N/A N/A PID a
TASK ACTIVITY bFOOT PROTECTION fRESPIRATOR CARTRIDGE
GPR = Ground Penetrating Radar ST = Steel-Toe Boots OV/PART = Organic Vapor/Particulate Combination Cartridge HA = Hand Augering RB = Rubber Boots HiE = High Efficiency Particulate UC = Utility Clearance FC = Boot Covers OV = Organic Vapor SS = Soil Sampling AC = Acid Gas
SB = Soil Boring CHEAD PROTECTION
GP = Geoprobe HH = Hard Hat gMONITORING EQUIPMENT
WC = Well Construction PID = Photoionization Detector
WS = Groundwater Sampling dEYE PROTECTION FID = Flame Ionization Detector D = Decontamination SG = Safety Glasses LEL/O2 = Explosimeter/Oxygen Meter DS = Drum Sampling FS = Face Shield DR = Draeger Tubes
SE = Soil Excavation FB = Film Badge
WD = Well Development eRESPIRATORY PROTECTION MR =Miniram DR = Drill Rig HF/APR = Half Face Air Purifying
DU = Degassing Unit FF/APR = Full Face Air Purifying
Cudahy Park Renovation Project, Project # PRE-001 Document Control 208 of 1214 Page 238 of 1692  


      



 

 
!


 " #$%
& '

(
(
)*(+ , 
"
<   
=
$( ($
,>, ? -./012345/61789:5/; @*
(
A

 > BCDEFDEGHBCIGJKLMNOPQRSPTUHJEECVPWXPKWPVXHMNOPQRHMKYCECBXZVX[\TPW]^_L`O^]PaM`WX`TbcZZda`LPe_ QXXe_IDDfff[dZZa`[]ZgDgPe_DO^TDhhDVXi\TPW]^_iL`O^]PaiMXTHiFjFCikilge`T^PaimfRHinWfZZOHiMKiYCEjEDoFF[YGjjCpHbBBq[EBECqpBHBGrDPgsXDOPXPstFgBtGuBtGgBGtGgBFtBgJtBgBtB_CvqC]E]]EjwjxBDE Cudahy Park Renovation Project, Project # PRE-001 Document Control 209 of 1214

Page 239 of 1692 ends













  




 
!" # 





 

$!% &'

(&
)*!+$+ ,+ +, ! '- 
./ 0

 12345346712869:;<=>?@AB?CD79442E?FG?:F?EG7<=>?@A7<:H2421GIEGJKC?FLMN;O>ML?P<OFGOCQRIISPO;?TN @GGTN833UUUJSIIPOJLIV3V?TN3>MC3WW3EGXKC?FLMNX;O>ML?PX<GC7X5Y52XZX[VTOCM?PX\UA7X]FUII>7X<:XH24Y43^55JH6YY2_7Q11`J4142`_1716a3?VbG3>?G?bc5V1c6d1c6V16c6V15c1V9c1V1c1N2e`2L4LL4YfYg434 Cudahy Park Renovation Project, Project # PRE-001 Document Control 210 of 1214

Page 240 of 1692 ends

PROPOSED BORING LOCATION MAP
Willdan
Cudahy Park Renovation Project
5220 Santa Ana Street
Cudahy, California
Project No:
24-41-114-01
Converse Consultants FIGURE 1
Geotechnical Boring Location
Proposed 8’ Soil Boring
Proposed 20’ Soil Boring
Cudahy Park Renovation Project, Project # PRE-001 Document Control 211 of 1214 Page 241 of 1692

CONVERSE CONSULTANTS
Soil Management Plan
Cudahy Park Renovation Project
5220 Santa Ana Street
Cudahy, California
Converse Project No. 24-41-114-02
February 27, 2025
Prepared For:

Willdan
2401 East Katella Avenue, Suite 300
Anaheim, CA 92806
Prepared By:

CONVERSE CONSULTANTS
717 South Myrtle Avenue
Monrovia, California 91016
Cudahy Park Renovation Project, Project # PRE-001 Document Control 212 of 1214 Page 242 of 1692 Converse Consultants
Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services 717 South Myrtle Avenue, Monrovia, CA 91016
Telephone: (626) 930-1200 ♦ Facsimile: (626) 930-1212 ♦ www.converseconsultants.com February 27, 2025
Mr. Tyrone Peter, PE
Willdan
2401 East Katella Avenue, Suite 300
Anaheim, California 92806
Subject: SOIL MANAGEMENT PLAN
Cudahy Park Renovation Project
5220 Santa Ana Street
City of Cudahy, Los Angeles County, California
Converse Project No. 24-41-114-02
Mr. Peter,
At your request, Converse Consultants (Converse) has prepared this Soil Management Plan for the Cudahy Park Renovation Project at 5220 Santa Ana Street in the City of Cudahy, California.

We appreciate the opportunity to be of service. If you have any questions, please do not hesitate to contact us at (626) 930-1200.

CONVERSE CONSULTANTS
Spencer Wagner Michael Van Fleet, PG
Project Environmental Scientist Principal Geologist
Norman Eke
Managing Officer/COB
Dist.: 1/Addressee (PDF)
Cudahy Park Renovation Project, Project # PRE-001 Document Control 213 of 1214 Page 243 of 1692 CONVERSE Project No. 24-41-114-02 i
Copyright 2025 CONVERSE CONSULTANTS
Table of Contents
Page

1.0 INTRODUCTION 1

2.0 SITE BACKGROUND 1

3.0 SITE CONDITIONS 3

3.1 Subsurface Profile of Project Site 3

3.2 Subsurface Variations 4

4.0 GENERAL INFORMATION 5

4.1 Construction Equipment’s Maintenance Area 5

4.2 Dust Control and Monitoring 5

4.3 Traffic Control and Road Maintenance 6

4.4 Construction Worker Health and Safety Plan 7

4.5 Construction Site Access and Control 7

4.6 Dust Emissions 8

5.0 GENERAL MANAGEMENT PROCEDURES FOR EXCAVATED SOIL 9

5.1 Visual and Olfactory 9

5.2 PID Screening 10

5.3 Sampling and Analysis Procedures 12

5.4. Stockpile Management 13

5.5 Soil Import Criteria 13

5.6 Reporting 14

6.0 UNANTICIPATED CONDITIONS 14

6.1 Notification 15

6.2 Underground Storage Tanks, Sumps, and Clarifiers 15

6.3 Stained, Visually Distinct or Odorous Soil 16

7.0 STORM WATER MANAGEMENT 16

8.0 EXPORTED SOIL MANAGEMENT 16

9.0 SOIL DISPOSAL 18

10.0 LIMITATIONS 19
Cudahy Park Renovation Project, Project # PRE-001 Document Control 214 of 1214 Page 244 of 1692 CONVERSE Project No. 24-41-114-02 ii
Copyright 2025 CONVERSE CONSULTANTS

11.0 REFERENCES 20

FIGURES
Figure 1 Site Location Map
Figure 2 Covenant Area
Figure 3 Procedures for Soil Screening, Stockpiling and Sampling

APPENDICES
Appendix A – Current Development Plan
Appendix B - AQMD Rules 403, 1166, 1403 and 1466
Appendix C - Health and Safety Plan
Appendix D – DTSC Information Advisory, Clean Imported Fill Appendix E - Soil Screening Form
Cudahy Park Renovation Project, Project # PRE-001 Document Control 215 of 1214 Page 245 of 1692 Willdan
Cudahy Park Renovation Project
Soil Management Plan
5220 Santa Ana Street, Cudahy, California
February 27, 2025
CONVERSE Project No. 24-41-114-02 1
Copyright 2025 CONVERSE CONSULTANTS

1.0 Introduction
The purpose of this Soil Management Plan (SMP) is to provide procedures and protocols to be utilized if contaminated soil is encountered during any construction excavation activities for the proposed Cudahy Park Renovation Project at 5220 Santa Ana Street, in the City of Cudahy, Los Angeles County, California (Site) (Figure 1).

2.0 Site Background
In January 2015, the City of Cudahy and State of California Department of Toxic Substances Control (DTSC) signed a Covenant to Restrict Use of Property (Covenant), Environmental Restriction, County of Los Angeles, Assessor Parcel Number 6224-014- 905. Pursuant to Civil Code Section 1471, the DTSC determined that the Covenant was reasonably necessary to protect present or future human health or safety or the environment as a result of the presence on the land of hazardous materials as defined in Health and Safety Code Section 25260. Pursuant to Civil Code Section 1471, and Health and Safety Code Section 25355.5, the City of Cudahy and DTSC agreed that the use of the Site be restricted as set forth in the Covenant.

As indicated in the Covenant, the Site is located in the area now generally bounded by Park Avenue Elementary School to the north, River Road to the east, and residences to the south and west. The Covenant covers two (2) specific areas of the Site, identified as the “Tree Boundary Area” and “River Road Area”. These areas are indicated on Figure 2 – Covenant Area. The Tree Boundary Area is located in the area now generally bounded by the basketball court and parking lot on the north, River Road on the east, and baseball fields on the south and west. The River Road Area is located at the eastern part of Los Angeles County Assessor’s Parcel No. 6224-014-905.

According to the Covenant, the Site was remediated pursuant to a Removal Action Workplan (RAW) developed under Chapter 6.8 of division 20 of the Health and Safety Code, under the oversight of DTSC. The RAW provided that a deed restriction be required as part of the site remediation, because lead, benzo(a)pyrene, toluene, and xylenes, remain at depths of one-foot or more below the surface of the Tree Boundary Area and River Road Area. Following approval of the RAW, soils were excavated to depths of 8 to 14 feet below ground surface (bgs), graded, and then backfilled with clean soil. As detailed in the Final Removal Action Completion Report that was approved by DTSC on December 8, 2005, a portion of the subsurface soils within 10 feet of the surface of the Tree Boundary Area contain hazardous substances including lead (1,103 parts per Cudahy Park Renovation Project, Project # PRE-001 Document Control 216 of 1214 Page 246 of 1692 Willdan
Cudahy Park Renovation Project
Soil Management Plan
5220 Santa Ana Street, Cudahy, California
February 27, 2025
CONVERSE Project No. 24-41-114-02 2
Copyright 2025 CONVERSE CONSULTANTS
million [ppm]), benzo(a)pyrene (4.18 ppm), benzene (1.3 ppm), toluene (2.3 ppm), and xylenes (2.9 ppm). The soils underneath the River Road Area within 10 feet of the surface contain lead (2,160 ppm), and benzo(a)pyrene (2.71 ppm). The DTSC further concluded that the remainder of the Site, as remediated, does not present an unacceptable threat to human safety or the environment.

Section 4.02 of Article IV of the Covenant provided the following restrictions pertaining to Soil Management:
a) No activities that will disturb the soil (e.g. excavation, grading, removal, trenching, filling, earth movement or mining) shall be allowed on the Tree Boundary Area or under River Road without a Soil Management Plan and Health and Safety Plan approved by the DTSC.
b) Any contaminated soils brought to the surface by grading, excavation, trenching, or backfilling shall be managed in accordance with all applicable provisions of state and federal law.
c) The Owner shall provide the DTSC written notice at least 14 days prior to any building, filling, grading, mining, or excavating in the Tree Boundary Area or under River Road.

Project Description
The Cudahy Park Renovation Project focuses on parkwide renovation improvements such as renovating basketball, baseball, tennis courts, as well as the playground and skate park. Additions to the park include a community stage, splash pad, exercise equipment, picnic area, and shade structures.

As part of the renovation activities, both demolition and construction activities are proposed in the area(s) covered under the Covenant.

Tree Boundary Area
Demolition activities proposed in the Tree Boundary Area will include the removal of two (2) existing concrete pads with park table, trash receptacle, and barbeque grill; removal of an existing park light; and removal of two (2) existing trees (including roots to 36-inches in depth).

Construction activities proposed in the Tree Boundary Area include the installation of a 4-inch thick Portland concrete cement (PCC) walkway/paving with retardant slab and pad, and installation of a pre-fabricated amphitheater/shade structure.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 217 of 1214 Page 247 of 1692 Willdan
Cudahy Park Renovation Project
Soil Management Plan
5220 Santa Ana Street, Cudahy, California
February 27, 2025
CONVERSE Project No. 24-41-114-02 3
Copyright 2025 CONVERSE CONSULTANTS
River Road Area
Demolition activities proposed in the River Road Area include the disassembling and removal of the existing baseball bleachers, baseball benches, and backstop.

Construction activities proposed in the River Road Area include the assembly and installation of prefabricated bleachers, benches, and backstop.

Proposed development plans are presented in Appendix A, with shading indicating the approximate extents of the Tree Boundary and River Road Areas.

Based on the proposed renovation activities potentially encountering contaminated soils in the areas covered by the Covenant, and in accordance with Section 4.2c of Article IV of the Covenant, this SMP should be submitted and approved by DTSC prior to commencing renovation activities in these areas.

3.0 Site Conditions
The following information was obtained from the Willdan Engineering Draft Geotechnical Investigation Report, Cudahy Park Renovations, Cudahy, California, dated December 21, 2023.

3.1 Subsurface Profile of Project Site
Site Geology and Hydrogeology
The Site is in Cudahy along the western side of the north-south trending Los Angeles River (LAR) channel about 13 miles north of the Pacific Ocean. The topography in the study area slopes gently southward, generally parallel to the LAR channel.

The present-day Los Angeles Basin is a northwest-trending alluvial plain about 50 miles long and 20 miles wide, on the coast of Southern California, bounded on the north by the Santa Monica Mountains and the Elysian, Repetto, and Puente Hills and on the east and southeast by the Santa Ana Mountains and San Joaquin Hills.

The low land surface slopes gently south or seaward, interrupted by the Coyote Hills near the northeast margin, a line of elongated low hills to the south and west that extend from Newport Bay northwest to Beverly Hills, and by the Palos Verdes peninsula along the southwestern extremity.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 218 of 1214 Page 248 of 1692 Willdan
Cudahy Park Renovation Project
Soil Management Plan
5220 Santa Ana Street, Cudahy, California
February 27, 2025
CONVERSE Project No. 24-41-114-02 4
Copyright 2025 CONVERSE CONSULTANTS
Soils encountered to maximum depths of 21.5 feet bgs during the geotechnical investigation consisted primarily of fill and brown silty to clayey sand and sandy to silty clay.

Review of the CDMG Seismic Hazard Zone Report for the project area (CDMG, 1998, South Gate Quadrangle), indicates that historically high groundwater in the vicinity of the project site may have been within 8 feet of ground surface. The project area is in a liquefaction hazard zone as mapped by the CGS.

Review of previous reports available online at the California Geotracker Database indicates that previous borings advanced about ¼- to ½-mile west of the project site encountered primarily silty sand to sandy soils in the upper 25 feet with primarily sandy soils with interlayered clay lenses from 25 to 75 feet. Borings reviewed on the GeoTracker database from about 1995 to 2010 reported groundwater at a depth of about 50 to 55 feet.

Groundwater was not encountered during the geotechnical investigation.

3.2 Subsurface Variations
Based on results of the subsurface exploration by others and our experience, some variations in the continuity and nature of subsurface conditions within the project site should be anticipated. Because of the uncertainties involved in the nature and depositional characteristics of the earth material at the Site, care should be exercised in interpolating or extrapolating subsurface conditions between or beyond the boring locations. If, during construction, subsurface conditions differ significantly from those presented in this SMP, the Owner should be notified immediately so that recommendations can be modified, if necessary.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 219 of 1214 Page 249 of 1692 Willdan
Cudahy Park Renovation Project
Soil Management Plan
5220 Santa Ana Street, Cudahy, California
February 27, 2025
CONVERSE Project No. 24-41-114-02 5
Copyright 2025 CONVERSE CONSULTANTS

4.0 General Information
Converse recommends that the Owner and the Contractor and subcontractors consider the following recommendations prior to and during all soil excavation activities.

4.1 Construction Equipment’s Maintenance Area
It is recommended that construction equipment maintenance and storage areas be protected with the installation of an impermeable layer made of geomembrane and one (1) to two (2)-inch diameter crushed rock to collect oil and hydraulic drips. All equipment should be fueled over the protective layer made of fabric and rock.

4.2 Dust Control and Monitoring
It is assumed that truck and vehicle staging will be onsite. Traffic patterns and startup can affect the number of vehicles in staging. Shaker plates should be installed at the construction entrance and/or exit. The purpose of these plates is to slow down the truck traffic and to provide dust control by removing dirt from the treads of the truck tires.

Water trucks or buffaloes should be present at all times at the Site. The water trucks should be used for dust control and other construction activities that require water.

Contractor should apply the necessary water to prevent dust emissions. These operations should be closely monitored by the Project Manager and/or Superintendent.

South Coast Air Quality Management District (SCAQMD) has three (3) rules which address excavation work (Rules 1150, 1166 and 1466), and one (1), which addresses fugitive dust (Rule 403). Rule 1150 applies to the excavation of sanitary landfills and does not apply to this project.

Rule 1166 applies to the excavation of soils containing VOCs and may apply to this project based on the reported concentrations of VOCs in soils including benzene, toluene, and xylenes. Several elements of Rule 403, including air monitoring protocols and mitigation of potential fugitive dust emissions should be incorporated into the project as may be required by the SCAQMD. Protocols outlined in Rule 1466 for Toxic Air Contaminants will apply should the volume of soil to be disturbed at depths greater than 1.0-foot bgs in the Covenant-covered areas exceed 50 cubic yards. Copies of the Rules are presented Appendix B.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 220 of 1214 Page 250 of 1692 Willdan
Cudahy Park Renovation Project
Soil Management Plan
5220 Santa Ana Street, Cudahy, California
February 27, 2025
CONVERSE Project No. 24-41-114-02 6
Copyright 2025 CONVERSE CONSULTANTS
Air monitoring should be performed during all Site activities in which impacted or potentially contaminated materials are being disturbed or handled. Details regarding air monitoring and potential sampling procedures are presented in the Health and Safety Plan (HASP) in Appendix C. The contractor will staff the Site with an air monitoring/health and safety professional whose responsibilities will include:
• Monitoring dust levels in the exclusion zone and other locations. The Site air monitoring professional will have the authority to stop-work in the event that onsite activities generate dust levels that exceed the Site or community action levels (see the chart below). The air monitoring professional will monitor onsite meteorological instrumentation and/or coordinate with offsite meteorological professionals to identify conditions that require cessation of work, e.g., winds in excess of 15 mph. In accordance with SACQMD Rule 1466, the action levels for work stoppage will be set at a sustained wind velocity of 15 mph averaged over a 15-minute period, or instantaneous wind speeds exceeding 25 mph.
• Assure that all real-time aerosol monitors and industrial hygiene air sampling equipment and media are properly calibrated and in good working condition.

Real-time, data-logging aerosol monitors (personal data ram) will be used, when required, to measure dust levels. Real-time information will be posted daily and discussed with Site workers. As potential analytical results for industrial hygiene samples (using OSHA/ National Institute of Occupational Safety and Health (NIOSH) approved methods, such as NIOSH 7082 and 7105 for lead dust scan) are received, the air monitoring professional will prepare summary sheets and discuss results with onsite management and workers.
• Coordinate general Site safety activities including all daily hazard communication, safety practices and procedure briefings. • Oversight of personal decontamination practices.
• General Site safety leadership, support and recordkeeping activities.

4.3 Traffic Control and Road Maintenance
Contractor shall provide and maintain all traffic control devices in accordance with local authorities and The California Department of Transportation Manual of Traffic Controls for Construction and Maintenance Work Zones, including but not limited to Cudahy Park Renovation Project, Project # PRE-001 Document Control 221 of 1214 Page 251 of 1692 Willdan
Cudahy Park Renovation Project
Soil Management Plan
5220 Santa Ana Street, Cudahy, California
February 27, 2025
CONVERSE Project No. 24-41-114-02 7
Copyright 2025 CONVERSE CONSULTANTS
flagmen, signs, lights, barricades and all other equipment needed to insure the safety of vehicular and pedestrian traffic.

Street cleaning equipment (sweepers) should be provided when appropriate, especially during hauling days. The cleaning equipment should prevent migration of loose dirt and water to catch basins and reduce the migration of dust to the neighboring sites.

4.4 Construction Worker Health and Safety Plan
All contractors will be responsible for operating in accordance with the most current requirements of Title 8, California Code of Regulations, section 5192 (8 CCR 5192) and Title 29, Code of Federal Regulations, section 1910.120 (29 CFR 1910.120), Standards for Hazardous Waste Operations and Emergency Response (HAZWOPER). Onsite personnel are responsible for operating in accordance with all applicable regulations of the Occupational Safety and Health Administration (OSHA) outlined in 8 CCR General Industry and Construction Safety Orders and 29 CFR 1910 and 29 CFR 1926, Construction Industry Standards, as well as other applicable federal, state and local laws and regulations. All personnel shall operate in compliance with all California OSHA requirements.

A Health and Safety Plan (HASP) for the SMP has been prepared and is provided in Appendix C. The provisions of the HASP are mandatory for all personnel of the PP and its contractors who are at the Site. The PP’s contractor and its subcontractors doing fieldwork in association with this SMP will either adopt and abide by the HASP or shall develop their own safety plans which, at a minimum, meet the requirements of the HASP. All onsite personnel shall read the HASP and sign the “Plan Acceptance Form” (Attachment A of the HASP) before starting Site activities.

4.5 Construction Site Access and Control
Access to the Site during construction and maintenance activities will be limited to authorized personnel in compliance with HASP requirements. The potential for trespassers or visitors to gain access to construction areas and come into direct contact with potentially contaminated soil will be controlled through the implementation of the following access and perimeter security measures:

Cudahy Park Renovation Project, Project # PRE-001 Document Control 222 of 1214 Page 252 of 1692 Willdan
Cudahy Park Renovation Project
Soil Management Plan
5220 Santa Ana Street, Cudahy, California
February 27, 2025
CONVERSE Project No. 24-41-114-02 8
Copyright 2025 CONVERSE CONSULTANTS
• Security fencing will be placed around any portion of the Site that is under construction or where potentially contaminated soil is exposed to prevent pedestrian/vehicular entry except at controlled (gated) points. • Gates will be closed and locked during non-construction hours. Fencing will consist of a chain link or equivalent fence unless particular safety considerations warrant the use of a higher fence.
• Post “No Trespassing” signs every 200 feet.
• Post proposition 65 signs warning that contamination within the fenced areas may be harmful to health.

Implementation of appropriate Site-specific measures as outlined above will reduce the potential for trespassers or visitors to gain access to construction areas and to come into direct contact with potentially contaminated soil or groundwater.

4.6 Dust Emissions
Dust emissions are regulated under SCAQMD Rule 403 Fugitive Dust and Rule 1466 Control of Particulate Emissions from Soils with Toxic Air Contaminants. The purpose of these Rules is to reduce the amount of particulate matter entrained in the ambient air as a result of anthropogenic (man-made) fugitive dust sources by requiring actions to prevent, reduce or mitigate fugitive dust emissions. Work shall be in compliance with Rule 403. As indicated in Section 4.2, work will also need to be performed in accordance with protocols of Rule 1466 should soil disturbance in the Covenant-covered areas exceed 50 cubic yards. A copy of these Rules are presented in Appendix B.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 223 of 1214 Page 253 of 1692 Willdan
Cudahy Park Renovation Project
Soil Management Plan
5220 Santa Ana Street, Cudahy, California
February 27, 2025
CONVERSE Project No. 24-41-114-02 9
Copyright 2025 CONVERSE CONSULTANTS

5.0 General Management Procedures for Excavated
Soil
It is possible to contaminated soil remaining onsite in previously identified areas may be encountered during project activities. It is our recommendation that the initial excavation activities be monitored on a continual basis using visual and olfactory observations.

Figure 3 provides a generalized flowchart of the soil excavation monitoring process. The figure presents the steps to be followed during excavations with the purpose to check if the excavated soils may be reused onsite or if they must be removed from the Site.

5.1 Visual and Olfactory
As described in Section 2, above, the potential exists for encountering soil potentially contaminated with VOCs and potentially other hazardous substances.

As a result of this condition, it will be important to segregate and manage contaminated soil separately from clean soil during excavation, transport, and offsite disposal activities.

To facilitate such segregation, the excavation contractor will work with a qualified environmental geologist (PG) or engineer (PE), experienced in the identification and screening of potentially contaminated soil, to assist in drawing the distinction between clean and contaminated soil. Field screening may be conducted using multiple tools consisting of observing visual and olfactory characteristics and monitoring organic vapor emissions using organic vapor monitoring instruments such as a photoionization detector (PID), organic vapor monitor (OVM), or organic vapor analyzer (OVA).

Throughout the course of excavation, the environmental professional will observe the material being excavated and provide guidance on the material classification based on initial visual and olfactory characteristics. Visual evidence of contaminated soil will include soil coloration that is distinctly different than the native soil (discoloration), evidence of an oily or waxy sheen, presence of liquid or free-phase solution that is not groundwater, or other atypical non-native characteristic. Olfactory evidence of contaminated soil will include chemical odors, rotten egg odors, and/or petroleum odors (gasoline, diesel fuel, or crude oil type odors). Soil that shows visual and/or olfactory characteristics of contamination will be screened with a PID or similar organic vapor monitoring instrument. Soil that has been determined to be potentially contaminated on the basis of visual, Cudahy Park Renovation Project, Project # PRE-001 Document Control 224 of 1214 Page 254 of 1692 Willdan
Cudahy Park Renovation Project
Soil Management Plan
5220 Santa Ana Street, Cudahy, California
February 27, 2025
CONVERSE Project No. 24-41-114-02 10
Copyright 2025 CONVERSE CONSULTANTS
olfactory, and organic vapor readings will be segregated and managed in accordance with the protocol described in Section 5.4.

We recommend that visual and olfactory observations be conducted at all times.

The screening will help to minimize the mixing of clean and potentially contaminated soil in the excavation or trucks. Non-contaminated native soils typically have a distinct color and bedding as well as other physical attributes.

Chemically-impacted soils can exhibit a coloration that is distinctly different from surrounding non-contaminated soil materials.

When soils exhibit suspect color or odor, it is recommended that they not be excavated (left in situ) and be sampled in accordance with the procedures described below. Exposed or disturbed soils that exhibit suspect color or odor should be covered with 10-mil plastic sheeting pending analytical results.

In the event that suspect asbestos containing materials (ACM) are observed during excavation procedures, the excavation of that area will be stopped, and the area demarcated. The suspect ACM will be sampled by a Certified Asbestos Consultant and analyzed by a state-certified laboratory for asbestos content on a rush basis.

Soils in contact or associated with the suspect ACM will be segregated pending analysis. The analytical procedure for asbestos analysis will be South Coast Air Quality Management District (SCAQMD) Rule 1403. Any further action will be in accordance with Rule 1403 but not limited to Procedure 5 Work Plans for asbestos transite pipes as applicable. A copy of rule1403 is provided in Appendix C.

5.2 PID Screening
Should visual and olfactory observations indicate the presence of suspected contamination, screening should be conducted with a photoionization device (PID) or similar device. PID screening is a semi-quantitative method for evaluating whether excavated soil is potentially contaminated. A PID can detect volatile organic compounds (VOCs) such as some petroleum hydrocarbons and solvents, which are common industrial pollutants. Should VOCs be encountered during excavation activities, field monitoring with a PID should be conducted along with visual and olfactory observations to identify suspect and contaminated soil.

Soil screening should be conducted at regular intervals (15 minutes) during all excavation activities with a properly calibrated PID and logged. The calibration of the PID shall be checked every day with hexane as the calibration medium (span gas).

Cudahy Park Renovation Project, Project # PRE-001 Document Control 225 of 1214 Page 255 of 1692 Willdan
Cudahy Park Renovation Project
Soil Management Plan
5220 Santa Ana Street, Cudahy, California
February 27, 2025
CONVERSE Project No. 24-41-114-02 11
Copyright 2025 CONVERSE CONSULTANTS
The South Coast Air Quality Management District (SCAQMD) has established guidelines for the excavation of VOC-impacted soil. These guidelines are published in SCAQMD Rule 1166. Rule 1166 is applicable to any site where excavation activities have the potential to encounter VOC-impacted soils. If VOCs in excess of 50 parts per million (ppm), as measured with the PID calibrated to hexane, are encountered during excavation, the work must proceed under Rule 1166 guidelines, including notifications and permits.

The contractor shall apply for and obtain an approved mitigation plan prior to commencement of excavation or soil handling activities of VOC-impacted soils.

All PID measurements should be performed by placing the PID probe inlet no more than 3 inches from the surface of the excavated soil. If a reading greater than 50 ppm is initially noted at a particular location, the area should be re-screened at several locations to establish a consistent assessment of VOC levels. If PID readings are consistently above 50 ppm, Rule 1166 requirements must be implemented. The general requirements of Rule 1166 that affect excavation activities are summarized below:
− Contractor shall notify the Owner and the local SCAQMD within 24 hours that soils were found with PID readings greater than 50 ppm (SCAQMD’s Office is located in Diamond Bar, Los Angeles County, California and SCAQMD’s Phone Number is 909-396-2000).
− Implement approved mitigation plan.
− The total quantity of VOC-contaminated soil excavated should not exceed 2,000 cubic yards without taking further action. In the event that more than 2,000 cubic yards of VOC-contaminated soil is encountered, then a site-specific SMP for VOC-Contaminated soil must be prepared and submitted to the SCAQMD for approval before further excavation of VOC-contaminated soil may take place.
− During excavation, Contractor should take all precautionary measures to minimize the release of VOCs, odors, and dust, including but not limited to:
• Use of additional plastic sheeting and sandbags,
• Use of suppressants on exposed soil surfaces, and
• Maintaining paved public streets free of soil deposits.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 226 of 1214 Page 256 of 1692 Willdan
Cudahy Park Renovation Project
Soil Management Plan
5220 Santa Ana Street, Cudahy, California
February 27, 2025
CONVERSE Project No. 24-41-114-02 12
Copyright 2025 CONVERSE CONSULTANTS
− All VOC-contaminated soil below 1,000 ppm, as measured by PID, should be stockpiled/containerized. If stockpiled, the soil shall be placed on and covered with plastic sheeting, and stored separately from non-VOC-contaminated soil. − A VOC-contaminated stockpile (if applicable) should not contain more than 400 cubic yards of soil.
− Only the working face of the stockpile (if applicable) is exposed during excavation and all other portions of the stockpile be covered with plastic sheeting.
− All VOC-contaminated soil should be removed from the Site within 30 days of its excavation.

A copy of SCAQMD Rule 1166 is provided in Appendix B.

5.3 Sampling and Analysis Procedures
Any soil proposed to be removed from the Site, whether suspected to be clean or impacted, should initially be sampled in general accordance with the State of California Department of Toxic Substances Control (DTSC) Information Advisory for Clean Imported Fill, Appendix D. Soil samples may be collected from the bucket of the excavator, or directly from the sidewalls of the excavation areas. The samples will be collected directly into laboratory supplied glass jars and PreCore or Encore sample containers. In the event that excavated soils are stockpiled onsite, discrete samples will be collected from varying locations and depths at the stockpile. Soil for the analyses will be collected in laboratory-supplied 4 oz. glass jars. Sub-samples for VOC analysis will be collected from the stockpile in accordance with EPA Method 5035 using Pre-core or Encore sample containers.

In addition, a portion of the soil samples from each location will be collected into sealable plastic bags and screened in the field for the presence of VOCs using a PID.

All sample containers will be labeled and placed in an ice-chilled cooler for transport to a State of California Certified Environmental Laboratory for analysis on a rapid turnaround time (TAT) basis (24-hour TAT or earliest possible) in accordance with the following analytical methods or any deemed necessary by the PG or PE. • 6010/7471 – Title 22 Metals
Cudahy Park Renovation Project, Project # PRE-001 Document Control 227 of 1214 Page 257 of 1692 Willdan
Cudahy Park Renovation Project
Soil Management Plan
5220 Santa Ana Street, Cudahy, California
February 27, 2025
CONVERSE Project No. 24-41-114-02 13
Copyright 2025 CONVERSE CONSULTANTS
• 8260B – Volatile Organic Compounds (VOCs)
• 8270 – Polycyclic Aromatic Hydrocarbons (PAHs)
Based on the results of the laboratory test analyses and using Figure 3, the soil material should be characterized and if required, additional laboratory tests should be performed. Figure 3 will lead to one of the following alternatives:
• The soil is cleared for reuse onsite or off-site as clean fill; • The soil should be disposed of off-site at an appropriate facility, or • Additional sampling and analysis should be conducted to properly characterize the soil for waste disposal.

5.4. Stockpile Management
Stockpiling of excavated and/or imported soils may be necessary on a temporary basis to support the logistical phasing of the redevelopment activities. Whenever possible, soil stockpiles will be located in close proximity to the work area or the ultimate disposition area as practicable within the Site. Soil that has been determined to be potentially contaminated, on the basis of field screening, will be stockpiled separately from clean soil.

Stockpiles will be managed in compliance with storm water runoff and dust control requirements. Storm water runoff requirements will be specified in a project-specific Storm Water Pollution Prevention Plan (SWPPP). In general, stockpiles must be covered with a tarp, wetted, sloped, or controlled via appropriate means and methods as specified in the SWPPP and Dust Control Plan (DCP). Best management practices (BMPs) for erosion and sediment control will be implemented, as specified in the SWPPP, during construction activities. BMPs may include diversion of drainage from the stockpiles, installation of silt fencing/straw bale filter barriers on the down gradient toe of the stockpile slope, and dust control.

Stockpiles will be under control of the General Contractor at all times and inspected at least weekly to ensure dust control and runoff control measures are functioning adequately and as specified in the appropriate plans.

5.5 Soil Import Criteria
All soil imported onto the Site will be subject to sampling and soil quality controls established in the DTSC’s October 2001 Clean Imported Fill Material Information Cudahy Park Renovation Project, Project # PRE-001 Document Control 228 of 1214 Page 258 of 1692 Willdan
Cudahy Park Renovation Project
Soil Management Plan
5220 Santa Ana Street, Cudahy, California
February 27, 2025
CONVERSE Project No. 24-41-114-02 14
Copyright 2025 CONVERSE CONSULTANTS
Advisory or other appropriate regulatory guidance. A copy of the Advisory is included in Appendix D. When the chemical properties of imported fill are known sampling may not be required. Soil quality parameters for acceptable imported soil are based on the most applicable of the U.S. EPA Regional Screening Levels (RSLs) for residential land use or background concentrations for metals in soil.

Import soil with visual or olfactory evidence of petroleum hydrocarbons or other chemical contamination is prohibited. The soil import criteria do not address the vapor intrusion to indoor air pathway, and further screening for vapor intrusion concerns may be required if volatile chemicals are detected in imported soil. Import of soil with any level of VOCs is prohibited.

5.6 Reporting
Daily field notes of the monitoring activities will be provided at the end of each day.

Field notes will include at a minimum, the areas of excavation completed that day, final excavation depths at the end of the day, PID readings for the day and the analytical report from the previous day’s sampling. See Appendix E for the Soil Screening Form.

6.0 Unanticipated Conditions
The potential exists for encountering unknown conditions during the course of development. Unknown conditions are physical or chemical conditions that have not been previously identified and evaluated as documented in the Site investigation activities, summarized in Section 2. Unknown conditions may include unanticipated soil and/or soil vapor contamination, unexpected subsurface structures, buried pipelines, USTs, and/or other visual or olfactory evidence of contamination. This section establishes a protocol for the initial response to the discovery of an unknown condition, notification protocols, and a path forward such that development activities can continue safely. The Site-specific health and safety training that project proponents are required to provide to Site workers will include instruction on how to identify potential unknown conditions.

The primary purpose of the protocols presented in this Section are to: i) provide initial required response and notification of the discovered condition, ii) prescribe the collection and analysis of initial samples; and iii) provide the Owner and appropriate agencies with initial sampling data, documentation of proposed further work, and results of response actions, when complete.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 229 of 1214 Page 259 of 1692 Willdan
Cudahy Park Renovation Project
Soil Management Plan
5220 Santa Ana Street, Cudahy, California
February 27, 2025
CONVERSE Project No. 24-41-114-02 15
Copyright 2025 CONVERSE CONSULTANTS
The specific sampling to be conducted will be dependent on the nature of the discovered condition, chemicals of concern (COCs) and potential impacts, and regulatory requirements. In the event that unanticipated contaminated soils are suspected to have been encountered during earthwork activities (based on odors, staining, or other potential observations), it is recommended that the earthwork activities in that area be immediately ceased, the area be quarantined, and notification provided to the Owner and/or their authorized representative for further direction. It is recommended that the Contractor and/or Field Inspector document in writing with field sketches and demarcate the locations of the potentially contaminated soil. Exposed potentially contaminated soils should be covered with 10 mil thick plastic sheeting. The Project’s Environmental Consultant should immediately conduct field screening and collect soil samples for laboratory analysis.

If contamination is confirmed by laboratory analysis, appropriate protocols should be followed in general accordance with regulatory guidance. Consequently, further soil excavation should be performed by a contractor with a valid California State Contractors Board Hazardous Substance Removal Certification (HSRC) and under appropriate health and safety measures. It is recommended that excavation of any impacted soil be performed as soon as possible to continue with the construction logistics and timing of the project. The excavations should be monitored by a representative of the Owner and/or a third-party environmental consultant. Figure 3 illustrates a step-by-step flow chart that identifies soil management activities and key decision points when soil is found to be contaminated.

6.1 Notification
Upon discovery of a non-emergency unanticipated subsurface condition as described in this Section, the General Contractor shall notify the Owner, who will in turn notify the appropriate agency as soon as practicable, but in no case more than 24 hours after discovery. If any unanticipated subsurface condition is discovered, work must stop, and the project proponent must consult with Project Environmental Consultant. Project Environmental Consultant shall be a California licensed Professional Geologist or Engineer, who will provide guidance on how to proceed in accordance with applicable laws and regulations.

6.2 Underground Storage Tanks, Sumps, and Clarifiers
Buried physical objects including underground storage tanks (USTs), sumps, clarifiers, barrels, drums, containers, or other yet unknown underground structures of potential concern, and/or visual or olfactory evidence of contamination could be discovered during Site grading and excavation activities.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 230 of 1214 Page 260 of 1692 Willdan
Cudahy Park Renovation Project
Soil Management Plan
5220 Santa Ana Street, Cudahy, California
February 27, 2025
CONVERSE Project No. 24-41-114-02 16
Copyright 2025 CONVERSE CONSULTANTS
For UST encounters, or any subsurface feature qualifying as a UST, the contractor must stop work, notify the Los Angeles County Fire Department (LACFD) and obtain a permit for the removal and closure of the UST prior to proceeding. If an UST is broken open, then the contractor should immediately take action to stop or prevent a release by removing fluid, and then notify LACFD. All UST closure activities must be conducted in accordance with LACFD requirements.

6.3 Stained, Visually Distinct or Odorous Soil
As identified above, the possibility exists for encountering potentially contaminated soil, outside the currently known areas of contaminated soil. The General Contractor will take precautions to monitor for the presence of potentially contaminated soil using field screening tools, as described in this SMP. If suspected potentially contaminated soil is encountered, handling, management, and disposal of such soil will follow the protocols identified.

7.0 Storm Water Management
All soil excavation and stockpiling activities must conform to the requirements and stipulations of the Site’s SWPPP.

8.0 Exported Soil Management
Contractors generating surplus soil which is VOC or petroleum-contaminated and cannot be reused onsite and is to be removed for offsite disposal, are responsible for all testing, waste classification, selection of an appropriate disposal site, transportation, and all documentation related to offsite disposal of soil, debris, or other waste, resulting from the project proponent’s activities. Although Site investigation data indicate that soil within the development area would generally not be classified as hazardous waste, soil removed from the Site must be characterized and managed in accordance with Title 22 of the California Code of Regulations, Division 4.5, Chapter 11, if applicable, as well as the requirements of the disposal facility, and any other applicable law. To the extent applicable, labeling requirements for transportation of waste shall additionally be in accordance with Title 29 of the Code of Federal Regulations, Parts 172 and 173.

Soils designated for export from the Site shall have met either of the following criteria:

Cudahy Park Renovation Project, Project # PRE-001 Document Control 231 of 1214 Page 261 of 1692 Willdan
Cudahy Park Renovation Project
Soil Management Plan
5220 Santa Ana Street, Cudahy, California
February 27, 2025
CONVERSE Project No. 24-41-114-02 17
Copyright 2025 CONVERSE CONSULTANTS

1. Laboratory analytical results of soil samples for metals, VOCs, and TPH, will initially be compared to DTSC Human Health Risk (HHRA) NOTE NUMBER: 3, DTSC-modified Screening Levels (DTSC-SLs) (HHRA Note #3) for residential land use and/or EPA Regional Screening Levels for residential land use (RSL-r) for compounds not covered by HHRA Note #3. Also, no PID readings greater than 50 ppm, and no odor, discoloration, debris, or suspect ACM have been observed.

Soils meeting all of the above criteria may be re-used onsite if suitable or transported off-site.

2. If laboratory analytical results of soil samples for metals, VOCs, or TPH, are greater than their respective screening values, or if soils are observed to contain odors, discoloration, debris, suspect ACM, and/or have PID readings greater than 50 ppm, then the soils will be considered unacceptable for use as fill material and further evaluation may be required to determine the appropriate waste disposal option.

If unacceptable levels of any of the above listed chemicals are reported, further analysis by soluble threshold limit concentration (STLC) analytical procedures and/or toxicity characteristic leaching procedure (TCLP) may be required for confirmation and characterization. Furthermore, additional laboratory analyses such as for pesticides and herbicides, may be required for disposal profiling purposes.

Based on laboratory analytical results, proper transportation and disposal methods shall be determined. Note: STLC and TCLP analytical procedures may take as much as two (2) to three (3) days to receive results.

The soil shall not be removed from the Site until all appropriate analytical testing is completed. If the excavation contractor elects to stockpile the soil, then each individual stockpile generated will be no greater than 400 cubic yards. The stockpile will then be sampled for confirmation and characterization purposes. All stockpiles that are considered to be unacceptable must be placed on top of plastic sheeting and will be covered by plastic sheeting by the excavation contractor until such time confirmation results are received and proper disposal is determined.

See Sections 5.2 and 5.4 for procedures and requirements for stockpiling soils impacted with VOCs.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 232 of 1214 Page 262 of 1692 Willdan
Cudahy Park Renovation Project
Soil Management Plan
5220 Santa Ana Street, Cudahy, California
February 27, 2025
CONVERSE Project No. 24-41-114-02 18
Copyright 2025 CONVERSE CONSULTANTS

9.0 Soil Disposal
All soil to be disposed will be taken only to a certified and permitted California landfill or an equivalent out-of-state landfill, as appropriate and as determined by the waste profile.

Impacted soil that is to be exported from the Site shall be disposed of off-site to a disposal facility approved by the Owner. The contractor’s project manager and/or superintendent shall obtain approval from the Owner prior to disposal.

The Contractor shall work with the owner to ensure efficient and timely removal of impacted stockpiled soil. Soils impacted by chemical contaminants are subject to one of several state or federal management and disposal regulatory structures, depending upon the type and severity of contamination. In general, soils classified by laboratory analyses as Non-RCRA (United States Resource Conservation and Recovery Act) are the least impacted by contamination. Soils classified as California Hazardous are more significantly impacted, and soils designated as RCRA are most heavily impacted by contamination.

Licensed and certified disposal sites should be selected to ensure that a disposal facility is approved to accept the contaminated soil and that the facility meets with the Owner’s approval.

For purposes of document and liability management, only those individuals authorized by the Owner or their designee shall sign Uniform Hazardous Waste Manifests (UHWM) for the off-site disposal of any soil whose transport and disposal requires a UHWM. The Owner shall provide all information to be contained on the manifest, including Environmental Protection Agency Generator Identification Number and the name and location of the treatment, storage and disposal facility which will accept the waste. Clean, non-hazardous and non-regulated soil may be shipped under a standard bill of lading and may be signed by individuals not approved for UHWM management.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 233 of 1214 Page 263 of 1692 Willdan
Cudahy Park Renovation Project
Soil Management Plan
5220 Santa Ana Street, Cudahy, California
February 27, 2025
CONVERSE Project No. 24-41-114-02 19
Copyright 2025 CONVERSE CONSULTANTS

10.0 Limitations
This Soil Management Plan has been prepared for the sole benefit and exclusive use of Willdan during the renovations planned for the Tree Boundary and River Road areas of the Cudahy Park Renovation Project in the City of Cudahy, Los Angeles County, California in accordance with the terms and conditions under which it was prepared. Our services have been performed in accordance with applicable state and local ordinances and generally accepted practices in the geosciences. No other warranty, either express or implied, is made.

Reliance on this workplan by third parties is at the third parties sole risk. Site exploration identifies actual subsurface conditions only at those points where samples are taken, when they are taken. Data derived through sampling and analytical testing are extrapolated by geoscientists who then render an opinion about overall general subsurface conditions. The possibility of different local soil conditions cannot be discounted. Converse is not responsible or liable for any claims or damages associated with the accuracy or completeness of information provided by others. In the event that changes in the nature of the Site occur, or additional, relevant information about the Site is brought to our attention, the guidelines and procedures contained in this report may not be valid unless these changes and additional relevant information are reviewed and the conclusions of this report are modified or verified in writing.

This document should be implemented during excavations and rework of soils performed at the subject site. This document is not intended to be suitable for use on extensions or modifications to the project or for use on any other project other than the currently proposed, as it may not contain sufficient or appropriate information for such uses.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 234 of 1214 Page 264 of 1692 Willdan
Cudahy Park Renovation Project
Soil Management Plan
5220 Santa Ana Street, Cudahy, California
February 27, 2025
CONVERSE Project No. 24-41-114-02 20
Copyright 2025 CONVERSE CONSULTANTS

11.0 References
SCAQMD, Rules 403, 1166 and 1466
Cudahy Park Renovation Project, Project # PRE-001 Document Control 235 of 1214 Page 265 of 1692 CONVERSE Project No. 24-41-114-02
Copyright 2025 CONVERSE CONSULTANTSFigures
Figures
Cudahy Park Renovation Project, Project # PRE-001 Document Control 236 of 1214 Page 266 of 1692

SITE LOCATION MAP
Willdan
Cudahy Park
5220 Santa Ana Street
Cudahy, California
Project No:
24-41-114-01
Converse Consultants FIGURE 1
N
SITE
Image Source: Google Maps
Cudahy Park Renovation Project, Project # PRE-001 Document Control 237 of 1214 Page 267 of 1692

COVENANT AREA
Willdan
Cudahy Park
5220 Santa Ana Street
Cudahy, California
Project No:
24-41-114-02
Converse Consultants FIGURE 2
Cudahy Park Renovation Project, Project # PRE-001 Document Control 238 of 1214 Page 268 of 1692 PID >50 ppm
Or odors,
or staining
Reuse soil on Site
as needed by
Contractor
Excavate Soil and
Place in “Clean”
stockpile
Reuse on Site if
Needed
Collect Soil Samples for
Profiling and Submit to
Laboratory for Analysis
No Yes
No
Yes
Classify Waste Type using
Laboratory Data
Contractor to submit data for
profiling and Owner approval
Place soil in “Potentially
Contaminated” stockpile on
Plastic Sheeting and cover
with Plastic Sheeting
Sign Manifests/Bill of Lading
and Remove Soil From Site
Plan to dispose
offsite at an
appropriate location
Figure 3 - Procedures for Soil Screening, Stockpiling and Sampling Cudahy Park Renovation Project, Project # PRE-001 Document Control 239 of 1214 Page 269 of 1692 CONVERSE Project No. 24-41-114-02
Copyright 2025 CONVERSE CONSULTANTS
Current Development Plan Appendix A
Cudahy Park Renovation Project, Project # PRE-001 Document Control 240 of 1214 Page 270 of 1692

CITY OF CUDAHY

PARK AND RECREATION DEPARTMENT
5220 SANTA ANA STREET
CUDAHY, CA. 90201
323-773-5143

CITY OF CUDAHY

CUDAHY PARK RENOVATION PROJECT
13141 CROSSROADS PARKWAY NORTH, SUITE 405
INDUSTRY, CALIFORNIA 91746
(562) 908-6200

COMPREHENSIVE

INNOVATIVE

TRUSTED
Know what'sbelow.

Callbefore you dig.
® PLAN NO. 100% SUBMITTAL - PROGRESS DRAWINGS NOT FOR CONSTRUCTION MATCH LINE SEE PLAN NO. D-1

MATCH LINE
SEE PLAN NO. D-3
D-2
G
P
P
P
P
P P P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
A
P
K
P

P R I V E R R D
R
R
P
R
P
P
P
H
H
H
D H
R
R
K
P
P
P
A
B
C
D
F
E
G
P
H

LEGEND DEMOLITION/REMOVAL NOTES
R
I
J
K
L
SEE PLAN NO. D-1 FOR COMPLETE DEMOLITION NOTES

DEMOLITION PLAN
L
P L
P L
L
P
B
P

NORTHERN CITY HALL

SECTION
R
P
R
R
Cudahy Park Renovation Project, Project # PRE-001 Document Control 241 of 1214 Page 271 of 1692 1186-ADA-2 Option Top View
ew Vi po T tion 2 Op -ADA- 6 118
1 1
8 6-A
DA-2 O
p
tion T
op View 1186-ADA-2 Option Top View
SEE PLAN NO. CD-10

FOR BASEBALL FIELD

EQUIPMENT/APPARATUS

REMOVAL AND REPLACEMENT
SEE PLAN NO. CD-10

FOR BASEBALL FIELD

EQUIPMENT/APPARATUS

REMOVAL AND REPLACEMENT
V08
V06
V
0 8
V0
V 8
W009 #2






13141 CROSSROADS PARKWAY NORTH, SUITE 405
INDUSTRY, CALIFORNIA 91746
(562) 908-6200


 


 

R I V E R R D




  
  

















CONSTRUCTION NOTES




















CONSTRUCTION GENERAL NOTES

 
Cudahy Park Renovation Project, Project # PRE-001 Document Control 242 of 1214

Page 272 of 1692 ends

CONVERSE Project No. 24-41-114-02
Copyright 2025 CONVERSE CONSULTANTSAppendix B
SCAQMD Rules
403, 1166, 1403,1466
Cudahy Park Renovation Project, Project # PRE-001 Document Control 243 of 1214 Page 273 of 1692 403 - 1
(Adopted May 7, 1976) (Amended November 6, 1992)
(Amended July 9, 1993) (Amended February 14, 1997)
(Amended December 11, 1998)(Amended April 2, 2004)
(Amended June 3, 2005)
RULE 403. FUGITIVE DUST
(a) Purpose
The purpose of this Rule is to reduce the amount of particulate matter entrained in the ambient air as a result of anthropogenic (man-made) fugitive dust sources by requiring actions to prevent, reduce or mitigate fugitive dust emissions. (b) Applicability
The provisions of this Rule shall apply to any activity or man-made condition capable of generating fugitive dust.
(c) Definitions
(1) ACTIVE OPERATIONS means any source capable of generating fugitive dust, including, but not limited to, earth-moving activities, construction/demolition activities, disturbed surface area, or heavy- and light-duty vehicular movement.
(2) AGGREGATE-RELATED PLANTS are defined as facilities that produce and / or mix sand and gravel and crushed stone.
(3) AGRICULTURAL HANDBOOK means the region-specific guidance document that has been approved by the Governing Board or hereafter approved by the Executive Officer and the U.S. EPA. For the South Coast Air Basin, the Board-approved region-specific guidance document is the Rule 403 Agricultural Handbook dated December 1998. For the Coachella Valley, the Board-approved region-specific guidance document is the Rule 403 Coachella Valley Agricultural Handbook dated April 2, 2004.
(4) ANEMOMETERS are devices used to measure wind speed and direction in accordance with the performance standards, and maintenance and calibration criteria as contained in the most recent Rule 403 Implementation Handbook.
(5) BEST AVAILABLE CONTROL MEASURES means fugitive dust control actions that are set forth in Table 1 of this Rule.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 244 of 1214 Page 274 of 1692 Rule 403 (cont.) (Amended June 3, 2005)
403 - 2
(6) BULK MATERIAL is sand, gravel, soil, aggregate material less than two inches in length or diameter, and other organic or inorganic particulate matter.
(7) CEMENT MANUFACTURING FACILITY is any facility that has a cement kiln at the facility.
(8) CHEMICAL STABILIZERS are any non-toxic chemical dust suppressant which must not be used if prohibited for use by the Regional Water Quality Control Boards, the California Air Resources Board, the U.S.

Environmental Protection Agency (U.S. EPA), or any applicable law, rule or regulation. The chemical stabilizers shall meet any specifications, criteria, or tests required by any federal, state, or local water agency.

Unless otherwise indicated, the use of a non-toxic chemical stabilizer shall be of sufficient concentration and application frequency to maintain a stabilized surface.
(9) COMMERCIAL POULTRY RANCH means any building, structure, enclosure, or premises where more than 100 fowl are kept or maintained for the primary purpose of producing eggs or meat for sale or other distribution.
(10) CONFINED ANIMAL FACILITY means a source or group of sources of air pollution at an agricultural source for the raising of 3,360 or more fowl or 50 or more animals, including but not limited to, any structure, building, installation, farm, corral, coop, feed storage area, milking parlor, or system for the collection, storage, or distribution of solid and liquid manure; if domesticated animals, including horses, sheep, goats, swine, beef cattle, rabbits, chickens, turkeys, or ducks are corralled, penned, or otherwise caused to remain in restricted areas for commercial agricultural purposes and feeding is by means other than grazing.
(11) CONSTRUCTION/DEMOLITION ACTIVITIES means any on-site mechanical activities conducted in preparation of, or related to, the building, alteration, rehabilitation, demolition or improvement of property, including, but not limited to the following activities: grading, excavation, loading, crushing, cutting, planing, shaping or ground breaking. (12) CONTRACTOR means any person who has a contractual arrangement to conduct an active operation for another person.
(13) DAIRY FARM is an operation on a property, or set of properties that are contiguous or separated only by a public right-of-way, that raises cows or Cudahy Park Renovation Project, Project # PRE-001 Document Control 245 of 1214 Page 275 of 1692 Rule 403 (cont.) (Amended June 3, 2005)
403 - 3
produces milk from cows for the purpose of making a profit or for a livelihood. Heifer and calf farms are dairy farms.
(14) DISTURBED SURFACE AREA means a portion of the earth's surface which has been physically moved, uncovered, destabilized, or otherwise modified from its undisturbed natural soil condition, thereby increasing the potential for emission of fugitive dust. This definition excludes those areas which have:
(A) been restored to a natural state, such that the vegetative ground cover and soil characteristics are similar to adjacent or nearby natural conditions;
(B) been paved or otherwise covered by a permanent structure; or (C) sustained a vegetative ground cover of at least 70 percent of the native cover for a particular area for at least 30 days. (15) DUST SUPPRESSANTS are water, hygroscopic materials, or non-toxic chemical stabilizers used as a treatment material to reduce fugitive dust emissions.
(16) EARTH-MOVING ACTIVITIES means the use of any equipment for any activity where soil is being moved or uncovered, and shall include, but not be limited to the following: grading, earth cutting and filling operations, loading or unloading of dirt or bulk materials, adding to or removing from open storage piles of bulk materials, landfill operations, weed abatement through disking, and soil mulching.
(17) DUST CONTROL SUPERVISOR means a person with the authority to expeditiously employ sufficient dust mitigation measures to ensure compliance with all Rule 403 requirements at an active operation. (18) FUGITIVE DUST means any solid particulate matter that becomes airborne, other than that emitted from an exhaust stack, directly or indirectly as a result of the activities of any person. (19) HIGH WIND CONDITIONS means that instantaneous wind speeds exceed 25 miles per hour.
(20) INACTIVE DISTURBED SURFACE AREA means any disturbed surface area upon which active operations have not occurred or are not expected to occur for a period of 20 consecutive days.
(21) LARGE OPERATIONS means any active operations on property which contains 50 or more acres of disturbed surface area; or any earth-moving operation with a daily earth-moving or throughput volume of 3,850 cubic Cudahy Park Renovation Project, Project # PRE-001 Document Control 246 of 1214 Page 276 of 1692 Rule 403 (cont.) (Amended June 3, 2005)
403 - 4
meters (5,000 cubic yards) or more three times during the most recent 365-day period.
(22) OPEN STORAGE PILE is any accumulation of bulk material, which is not fully enclosed, covered or chemically stabilized, and which attains a height of three feet or more and a total surface area of 150 or more square feet.
(23) PARTICULATE MATTER means any material, except uncombined water, which exists in a finely divided form as a liquid or solid at standard conditions.
(24) PAVED ROAD means a public or private improved street, highway, alley, public way, or easement that is covered by typical roadway materials, but excluding access roadways that connect a facility with a public paved roadway and are not open to through traffic. Public paved roads are those open to public access and that are owned by any federal, state, county, municipal or any other governmental or quasi-governmental agencies.

Private paved roads are any paved roads not defined as public. (25) PM10 means particulate matter with an aerodynamic diameter smaller than or equal to 10 microns as measured by the applicable State and Federal reference test methods.
(26) PROPERTY LINE means the boundaries of an area in which either a person causing the emission or a person allowing the emission has the legal use or possession of the property. Where such property is divided into one or more sub-tenancies, the property line(s) shall refer to the boundaries dividing the areas of all sub-tenancies.
(27) RULE 403 IMPLEMENTATION HANDBOOK means a guidance
document that has been approved by the Governing Board on April 2, 2004 or hereafter approved by the Executive Officer and the U.S. EPA. (28) SERVICE ROADS are paved or unpaved roads that are used by one or more public agencies for inspection or maintenance of infrastructure and which are not typically used for construction-related activity. (29) SIMULTANEOUS SAMPLING means the operation of two PM10 samplers in such a manner that one sampler is started within five minutes of the other, and each sampler is operated for a consecutive period which must be not less than 290 minutes and not more than 310 minutes. (30) SOUTH COAST AIR BASIN means the non-desert portions of Los Angeles, Riverside, and San Bernardino counties and all of Orange Cudahy Park Renovation Project, Project # PRE-001 Document Control 247 of 1214 Page 277 of 1692 Rule 403 (cont.) (Amended June 3, 2005)
403 - 5
County as defined in California Code of Regulations, Title 17, Section 60104. The area is bounded on the west by the Pacific Ocean, on the north and east by the San Gabriel, San Bernardino, and San Jacinto Mountains, and on the south by the San Diego county line. (31) STABILIZED SURFACE means any previously disturbed surface area or open storage pile which, through the application of dust suppressants, shows visual or other evidence of surface crusting and is resistant to winddriven fugitive dust and is demonstrated to be stabilized. Stabilization can be demonstrated by one or more of the applicable test methods contained in the Rule 403 Implementation Handbook.
(32) TRACK-OUT means any bulk material that adheres to and agglomerates on the exterior surface of motor vehicles, haul trucks, and equipment (including tires) that have been released onto a paved road and can be removed by a vacuum sweeper or a broom sweeper under normal operating conditions.
(33) TYPICAL ROADWAY MATERIALS means concrete, asphaltic concrete, recycled asphalt, asphalt, or any other material of equivalent performance as determined by the Executive Officer, and the U.S. EPA. (34) UNPAVED ROADS means any unsealed or unpaved roads, equipment paths, or travel ways that are not covered by typical roadway materials.

Public unpaved roads are any unpaved roadway owned by federal, state, county, municipal or other governmental or quasi-governmental agencies.

Private unpaved roads are all other unpaved roadways not defined as public.
(35) VISIBLE ROADWAY DUST means any sand, soil, dirt, or other solid particulate matter which is visible upon paved road surfaces and which can be removed by a vacuum sweeper or a broom sweeper under normal operating conditions.
(36) WIND-DRIVEN FUGITIVE DUST means visible emissions from any disturbed surface area which is generated by wind action alone. (37) WIND GUST is the maximum instantaneous wind speed as measured by an anemometer.
(d) Requirements
(1) No person shall cause or allow the emissions of fugitive dust from any active operation, open storage pile, or disturbed surface area such that:

Cudahy Park Renovation Project, Project # PRE-001 Document Control 248 of 1214 Page 278 of 1692 Rule 403 (cont.) (Amended June 3, 2005)
403 - 6
(A) the dust remains visible in the atmosphere beyond the property line of the emission source; or
(B) the dust emission exceeds 20 percent opacity (as determined by the appropriate test method included in the Rule 403 Implementation Handbook), if the dust emission is the result of movement of a motorized vehicle.
(2) No person shall conduct active operations without utilizing the applicable best available control measures included in Table 1 of this Rule to minimize fugitive dust emissions from each fugitive dust source type within the active operation.
(3) No person shall cause or allow PM10 levels to exceed 50 micrograms per cubic meter when determined, by simultaneous sampling, as the difference between upwind and downwind samples collected on high-volume particulate matter samplers or other U.S. EPA-approved equivalent method for PM10 monitoring. If sampling is conducted, samplers shall be:
(A) Operated, maintained, and calibrated in accordance with 40 Code of Federal Regulations (CFR), Part 50, Appendix J, or appropriate U.S. EPA-published documents for U.S. EPA-approved equivalent method(s) for PM10.
(B) Reasonably placed upwind and downwind of key activity areas and as close to the property line as feasible, such that other sources of fugitive dust between the sampler and the property line are minimized.
(4) No person shall allow track-out to extend 25 feet or more in cumulative length from the point of origin from an active operation. Notwithstanding the preceding, all track-out from an active operation shall be removed at the conclusion of each workday or evening shift.
(5) No person shall conduct an active operation with a disturbed surface area of five or more acres, or with a daily import or export of 100 cubic yards or more of bulk material without utilizing at least one of the measures listed in subparagraphs (d)(5)(A) through (d)(5)(E) at each vehicle egress from the site to a paved public road.
(A) Install a pad consisting of washed gravel (minimum-size: one inch) maintained in a clean condition to a depth of at least six inches and extending at least 30 feet wide and at least 50 feet long.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 249 of 1214 Page 279 of 1692 Rule 403 (cont.) (Amended June 3, 2005)
403 - 7
(B) Pave the surface extending at least 100 feet and at least 20 feet wide.
(C) Utilize a wheel shaker/wheel spreading device consisting of raised dividers (rails, pipe, or grates) at least 24 feet long and 10 feet wide to remove bulk material from tires and vehicle undercarriages before vehicles exit the site.
(D) Install and utilize a wheel washing system to remove bulk material from tires and vehicle undercarriages before vehicles exit the site. (E) Any other control measures approved by the Executive Officer and the U.S. EPA as equivalent to the actions specified in
subparagraphs (d)(5)(A) through (d)(5)(D).
(6) Beginning January 1, 2006, any person who operates or authorizes the operation of a confined animal facility subject to this Rule shall implement the applicable conservation management practices specified in Table 4 of this Rule.
(e) Additional Requirements for Large Operations
(1) Any person who conducts or authorizes the conducting of a large operation subject to this Rule shall implement the applicable actions specified in Table 2 of this Rule at all times and shall implement the applicable actions specified in Table 3 of this Rule when the applicable performance standards can not be met through use of Table 2 actions; and shall:
(A) submit a fully executed Large Operation Notification (Form 403 N) to the Executive Officer within 7 days of qualifying as a large operation;
(B) include, as part of the notification, the name(s), address(es), and phone number(s) of the person(s) responsible for the submittal, and a description of the operation(s), including a map depicting the location of the site;
(C) maintain daily records to document the specific dust control actions taken, maintain such records for a period of not less than three years; and make such records available to the Executive Officer upon request;
Cudahy Park Renovation Project, Project # PRE-001 Document Control 250 of 1214 Page 280 of 1692 Rule 403 (cont.) (Amended June 3, 2005)
403 - 8
(D) install and maintain project signage with project contact signage that meets the minimum standards of the Rule 403 Implementation Handbook, prior to initiating any earthmoving activities; (E) identify a dust control supervisor that:
(i) is employed by or contracted with the property owner or developer;
(ii) is on the site or available on-site within 30 minutes during working hours;
(iii) has the authority to expeditiously employ sufficient dust mitigation measures to ensure compliance with all Rule
requirements;
(iv) has completed the AQMD Fugitive Dust Control Class and has been issued a valid Certificate of Completion for the class; and
(F) notify the Executive Officer in writing within 30 days after the site no longer qualifies as a large operation as defined by paragraph (c)(18).
(2) Any Large Operation Notification submitted to the Executive Officer or AQMD-approved dust control plan shall be valid for a period of one year from the date of written acceptance by the Executive Officer. Any Large Operation Notification accepted pursuant to paragraph (e)(1), excluding those submitted by aggregate-related plants and cement manufacturing facilities must be resubmitted annually by the person who conducts or authorizes the conducting of a large operation, at least 30 days prior to the expiration date, or the submittal shall no longer be valid as of the expiration date. If all fugitive dust sources and corresponding control measures or special circumstances remain identical to those identified in the previously accepted submittal or in an AQMD-approved dust control plan, the resubmittal may be a simple statement of no-change (Form 403NC).
(f) Compliance Schedule
The newly amended provisions of this Rule shall become effective upon adoption.

Pursuant to subdivision (e), any existing site that qualifies as a large operation will have 60 days from the date of Rule adoption to comply with the notification and recordkeeping requirements for large operations. Any Large Operation Cudahy Park Renovation Project, Project # PRE-001 Document Control 251 of 1214 Page 281 of 1692 Rule 403 (cont.) (Amended June 3, 2005)
403 - 9
Notification or AQMD-approved dust control plan which has been accepted prior to the date of adoption of these amendments shall remain in effect and the Large Operation Notification or AQMD-approved dust control plan annual resubmittal date shall be one year from adoption of this Rule amendment. (g) Exemptions
(1) The provisions of this Rule shall not apply to:
(A) Dairy farms.
(B) Confined animal facilities provided that the combined disturbed surface area within one continuous property line is one acre or less. (C) Agricultural vegetative crop operations provided that the combined disturbed surface area within one continuous property line and not separated by a paved public road is 10 acres or less.
(D) Agricultural vegetative crop operations within the South Coast Air Basin, whose combined disturbed surface area includes more than 10 acres provided that the person responsible for such operations:
(i) voluntarily implements the conservation management
practices contained in the Rule 403 Agricultural Handbook; (ii) completes and maintains the self-monitoring form
documenting sufficient conservation management
practices, as described in the Rule 403 Agricultural
Handbook; and
(iii) makes the completed self-monitoring form available to the Executive Officer upon request.
(E) Agricultural vegetative crop operations outside the South Coast Air Basin whose combined disturbed surface area includes more than 10 acres provided that the person responsible for such operations:
(i) voluntarily implements the conservation management
practices contained in the Rule 403 Coachella Valley
Agricultural Handbook; and
(ii) completes and maintains the self-monitoring form
documenting sufficient conservation management
practices, as described in the Rule 403 Coachella Valley Agricultural Handbook; and
(iii) makes the completed self-monitoring form available to the Executive Officer upon request.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 252 of 1214 Page 282 of 1692 Rule 403 (cont.) (Amended June 3, 2005)
403 - 10
(F) Active operations conducted during emergency life-threatening situations, or in conjunction with any officially declared disaster or state of emergency.
(G) Active operations conducted by essential service utilities to provide electricity, natural gas, telephone, water and sewer during periods of service outages and emergency disruptions.
(H) Any contractor subsequent to the time the contract ends, provided that such contractor implemented the required control measures during the contractual period.
(I) Any grading contractor, for a phase of active operations, subsequent to the contractual completion of that phase of earthmoving activities, provided that the required control measures have been implemented during the entire phase of earth-moving activities, through and including five days after the final grading inspection.
(J) Weed abatement operations ordered by a county agricultural commissioner or any state, county, or municipal fire department, provided that:
(i) mowing, cutting or other similar process is used which maintains weed stubble at least three inches above the soil; and
(ii) any discing or similar operation which cuts into and disturbs the soil, where watering is used prior to initiation of these activities, and a determination is made by the agency issuing the weed abatement order that, due to fire hazard conditions, rocks, or other physical obstructions, it is not practical to meet the conditions specified in clause (g)(1)(H)(i). The provisions this clause shall not exempt the owner of any property from stabilizing, in accordance with paragraph (d)(2), disturbed surface areas which have been created as a result of the weed abatement actions. (K) sandblasting operations.
(2) The provisions of paragraphs (d)(1) and (d)(3) shall not apply:
(A) When wind gusts exceed 25 miles per hour, provided that:

Cudahy Park Renovation Project, Project # PRE-001 Document Control 253 of 1214 Page 283 of 1692 Rule 403 (cont.) (Amended June 3, 2005)
403 - 11
(i) The required Table 3 contingency measures in this Rule are implemented for each applicable fugitive dust source type, and;
(ii) records are maintained in accordance with subparagraph (e)(1)(C).
(B) To unpaved roads, provided such roads:
(i) are used solely for the maintenance of wind-generating equipment; or
(ii) are unpaved public alleys as defined in Rule 1186; or (iii) are service roads that meet all of the following criteria:
(a) are less than 50 feet in width at all points along the road;
(b) are within 25 feet of the property line; and
(c) have a traffic volume less than 20 vehicle-trips per day.
(C) To any active operation, open storage pile, or disturbed surface area for which necessary fugitive dust preventive or mitigative actions are in conflict with the federal Endangered Species Act, as determined in writing by the State or federal agency responsible for making such determinations.
(3) The provisions of (d)(2) shall not apply to any aggregate-related plant or cement manufacturing facility that implements the applicable actions specified in Table 2 of this Rule at all times and shall implement the applicable actions specified in Table 3 of this Rule when the applicable performance standards of paragraphs (d)(1) and (d)(3) can not be met through use of Table 2 actions.
(4) The provisions of paragraphs (d)(1), (d)(2), and (d)(3) shall not apply to:
(A) Blasting operations which have been permitted by the California Division of Industrial Safety; and
(B) Motion picture, television, and video production activities when dust emissions are required for visual effects. In order to obtain this exemption, the Executive Officer must receive notification in writing at least 72 hours in advance of any such activity and no nuisance results from such activity.
(5) The provisions of paragraph (d)(3) shall not apply if the dust control actions, as specified in Table 2, are implemented on a routine basis for Cudahy Park Renovation Project, Project # PRE-001 Document Control 254 of 1214 Page 284 of 1692 Rule 403 (cont.) (Amended June 3, 2005)
403 - 12
each applicable fugitive dust source type. To qualify for this exemption, a person must maintain records in accordance with subparagraph (e)(1)(C). (6) The provisions of paragraph (d)(4) shall not apply to earth coverings of public paved roadways where such coverings are approved by a local government agency for the protection of the roadway, and where such coverings are used as roadway crossings for haul vehicles provided that such roadway is closed to through traffic and visible roadway dust is removed within one day following the cessation of activities. (7) The provisions of subdivision (e) shall not apply to:
(A) officially-designated public parks and recreational areas, including national parks, national monuments, national forests, state parks, state recreational areas, and county regional parks.
(B) any large operation which is required to submit a dust control plan to any city or county government which has adopted a Districtapproved dust control ordinance. (C) any large operation subject to Rule 1158, which has an approved dust control plan pursuant to Rule 1158, provided that all sources of fugitive dust are included in the Rule 1158 plan.
(8) The provisions of subparagraph (e)(1)(A) through (e)(1)(C) shall not apply to any large operation with an AQMD-approved fugitive dust control plan provided that there is no change to the sources and controls as identified in the AQMD-approved fugitive dust control plan.
(h) Fees
Any person conducting active operations for which the Executive Officer conducts upwind/downwind monitoring for PM10 pursuant to paragraph (d)(3) shall be assessed applicable Ambient Air Analysis Fees pursuant to Rule 304.1. Applicable fees shall be waived for any facility which is exempted from paragraph (d)(3) or meets the requirements of paragraph (d)(3).

Cudahy Park Renovation Project, Project # PRE-001 Document Control 255 of 1214 Page 285 of 1692 Rule 403 (cont.) (Amended June 3, 2005)
TABLE 1

BEST AVAILABLE CONTROL MEASURES
(Applicable to All Construction Activity Sources)
403 - 13
Source Category Control Measure Guidance Backfilling 01-1 01-2 01-3
Stabilize backfill material when not actively handling; and Stabilize backfill material during handling; and Stabilize soil at completion of activity. 9 Mix backfill soil with water prior to moving 9 Dedicate water truck or high capacity hose to backfilling equipment
9 Empty loader bucket slowly so that no dust
plumes are generated
9 Minimize drop height from loader bucket
Clearing and grubbing
02-1 02-2 02-3
Maintain stability of soil through pre-watering of site prior to clearing and grubbing; and Stabilize soil during clearing and grubbing activities; and Stabilize soil immediately after clearing and grubbing activities. 9 Maintain live perennial vegetation where
possible
9 Apply water in sufficient quantity to prevent
generation of dust plumes
Clearing forms 03-1
03-2 03-3
Use water spray to clear forms; or Use sweeping and water spray to clear forms; or Use vacuum system to clear forms. 9 Use of high pressure air to clear forms may cause
exceedance of Rule requirements
Crushing 04-1
04-2
Stabilize surface soils prior to operation of support equipment; and Stabilize material after crushing. 9 Follow permit conditions for crushing equipment
9 Pre-water material prior to loading into crusher 9 Monitor crusher emissions opacity 9 Apply water to crushed material to prevent dust plumes
Cudahy Park Renovation Project, Project # PRE-001 Document Control 256 of 1214

Page 286 of 1692 ends

Rule 403 (cont.) (Amended June 3, 2005)
TABLE 1

BEST AVAILABLE CONTROL MEASURES
(Applicable to All Construction Activity Sources)
403 - 14
Source Category Control Measure Guidance Cut and fill 05-1 05-2
Pre-water soils prior to cut and fill activities; and Stabilize soil during and after cut and fill activities. 9 For large sites, pre-water with sprinklers or
water trucks and allow time for penetration
9 Use water trucks/pulls to water soils to depth
of cut prior to subsequent cuts
Demolition – mechanical/manual
06-1
06-2 06-3 06-4
Stabilize wind erodible surfaces to reduce dust; and Stabilize surface soil where support equipment and vehicles will operate; and Stabilize loose soil and demolition debris; and Comply with AQMD Rule 1403. 9 Apply water in sufficient quantities to
prevent the generation of visible dust plumes
Disturbed soil 07-1
07-2
Stabilize disturbed soil throughout the construction site; and Stabilize disturbed soil between structures 9 Limit vehicular traffic and disturbances on
soils where possible
9 If interior block walls are planned, install as
early as possible
9 Apply water or a stabilizing agent in
sufficient quantities to prevent the generation of visible dust plumes Earth-moving activities
08-1 08-2 08-3
Pre-apply water to depth of proposed cuts; and Re-apply water as necessary to maintain soils in a damp condition and to ensure that visible emissions do not exceed 100 feet in any direction; and Stabilize soils once earth-moving activities are complete. 9 Grade each project phase separately, timed
to coincide with construction phase
9 Upwind fencing can prevent material
movement on site
9 Apply water or a stabilizing agent in
sufficient quantities to prevent the generation of visible dust plumes Cudahy Park Renovation Project, Project # PRE-001 Document Control 257 of 1214

Page 287 of 1692 ends

Rule 403 (cont.) (Amended June 3, 2005)
TABLE 1

BEST AVAILABLE CONTROL MEASURES
(Applicable to All Construction Activity Sources)
403 - 15
Source Category Control Measure Guidance Importing/exporting of bulk materials 09-1
09-2 09-3 09-4 09-5
Stabilize material while loading to reduce fugitive dust emissions; and Maintain at least six inches of freeboard on haul vehicles; and Stabilize material while transporting to reduce fugitive dust emissions; and Stabilize material while unloading to reduce fugitive dust emissions; and Comply with Vehicle Code Section 23114. 9 Use tarps or other suitable enclosures on
haul trucks
9 Check belly-dump truck seals regularly and
remove any trapped rocks to prevent spillage
9 Comply with track-out
prevention/mitigation requirements
9 Provide water while loading and unloading
to reduce visible dust plumes
Landscaping 10-1 Stabilize soils, materials, slopes 9 Apply water to materials to stabilize 9 Maintain materials in a crusted condition
9 Maintain effective cover over materials
9 Stabilize sloping surfaces using soil binders
until vegetation or ground cover can effectively stabilize the slopes 9 Hydroseed prior to rain season
Road shoulder maintenance
11-1
11-2
Apply water to unpaved shoulders prior to clearing;
and Apply chemical dust suppressants and/or washed gravel to maintain a stabilized surface after completing road shoulder maintenance. 9 Installation of curbing and/or paving of road
shoulders can reduce recurring maintenance costs
9 Use of chemical dust suppressants can
inhibit vegetation growth and reduce future road shoulder maintenance costs Cudahy Park Renovation Project, Project # PRE-001 Document Control 258 of 1214

Page 288 of 1692 ends

Rule 403 (cont.) (Amended June 3, 2005)
TABLE 1

BEST AVAILABLE CONTROL MEASURES
(Applicable to All Construction Activity Sources)
403 - 16
Source Category Control Measure Guidance Screening 12-1 12-2 12-3
Pre-water material prior to screening; and Limit fugitive dust emissions to opacity and plume length standards; and Stabilize material immediately after screening. 9 Dedicate water truck or high capacity hose
to screening operation
9 Drop material through the screen slowly and
minimize drop height
9 Install wind barrier with a porosity of no
more than 50% upwind of screen to the height of the drop point Staging areas 13-1
13-2
Stabilize staging areas during use; and Stabilize staging area soils at project completion. 9 Limit size of staging area
9 Limit vehicle speeds to 15 miles per hour 9 Limit number and size of staging area entrances/exists
Stockpiles/ Bulk Material Handling
14-1
14-2
Stabilize stockpiled materials. Stockpiles within 100 yards of off-site occupied buildings must not be greater than eight feet in height; or must have a road bladed to the top to allow water truck access or must have an operational water irrigation system that is capable of complete stockpile coverage. 9 Add or remove material from the downwind
portion of the storage pile
9 Maintain storage piles to avoid steep sides
or faces
Cudahy Park Renovation Project, Project # PRE-001 Document Control 259 of 1214

Page 289 of 1692 ends

Rule 403 (cont.) (Amended June 3, 2005)
TABLE 1

BEST AVAILABLE CONTROL MEASURES
(Applicable to All Construction Activity Sources)
403 - 17
Source Category Control Measure Guidance Traffic areas for construction activities 15-1
15-2 15-3
Stabilize all off-road traffic and parking areas; and Stabilize all haul routes; and Direct construction traffic over established haul routes. 9 Apply gravel/paving to all haul routes as
soon as possible to all future roadway areas
9 Barriers can be used to ensure vehicles are
only used on established parking areas/haul routes
Trenching 16-1
16-2
Stabilize surface soils where trencher or excavator and support equipment will operate; and Stabilize soils at the completion of trenching activities. 9 Pre-watering of soils prior to trenching is an
effective preventive measure. For deep trenching activities, pre-trench to 18 inches soak soils via the pre-trench and resuming trenching 9 Washing mud and soils from equipment at
the conclusion of trenching activities can prevent crusting and drying of soil on equipment Truck loading 17-1
17-2
Pre-water material prior to loading; and Ensure that freeboard exceeds six inches (CVC 23114) 9 Empty loader bucket such that no visible
dust plumes are created
9 Ensure that the loader bucket is close to the
truck to minimize drop height while loading
Turf Overseeding 18-1
18-2
Apply sufficient water immediately prior to conducting turf vacuuming activities to meet opacity and plume length standards; and Cover haul vehicles prior to exiting the site. 9 Haul waste material immediately off-site
Cudahy Park Renovation Project, Project # PRE-001 Document Control 260 of 1214

Page 290 of 1692 ends

Rule 403 (cont.) (Amended June 3, 2005)
TABLE 1

BEST AVAILABLE CONTROL MEASURES
(Applicable to All Construction Activity Sources)
403 - 18
Source Category Control Measure Guidance Unpaved roads/parking lots 19-1 19-2
Stabilize soils to meet the applicable performance standards; and Limit vehicular travel to established unpaved roads (haul routes) and unpaved parking lots. 9 Restricting vehicular access to established
unpaved travel paths and parking lots can reduce stabilization requirements Vacant land 20-1 In instances where vacant lots are 0.10 acre or larger and have a cumulative area of 500 square feet or more that are driven over and/or used by motor vehicles and/or off-road vehicles, prevent motor vehicle and/or off-road vehicle trespassing, parking and/or access by installing barriers, curbs, fences, gates, posts, signs, shrubs, trees or other effective control measures.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 261 of 1214

Page 291 of 1692 ends

Rule 403 (cont.) (Amended June 3, 2005)
403 - 19
Table 2

DUST CONTROL MEASURES FOR LARGE OPERATIONS

FUGITIVE DUST

SOURCE CATEGORY

CONTROL ACTIONS
Earth-moving (except
construction cutting and
filling areas, and mining
operations)
(1a) Maintain soil moisture content at a minimum of
12 percent, as determined by ASTM method D2216, or other equivalent method approved by the Executive Officer, the California Air
Resources Board, and the U.S. EPA. Two soil
moisture evaluations must be conducted during
the first three hours of active operations during a
calendar day, and two such evaluations each
subsequent four-hour period of active operations;
OR
(1a-1) For any earth-moving which is more than 100
feet from all property lines, conduct watering as
necessary to prevent visible dust emissions from
exceeding 100 feet in length in any direction.

Earth-moving:

Construction fill areas:
(1b) Maintain soil moisture content at a minimum of
12 percent, as determined by ASTM method D2216, or other equivalent method approved by the Executive Officer, the California Air
Resources Board, and the U.S. EPA. For areas
which have an optimum moisture content for
compaction of less than 12 percent, as
determined by ASTM Method 1557 or other
equivalent method approved by the Executive
Officer and the California Air Resources Board
and the U.S. EPA, complete the compaction
process as expeditiously as possible after
achieving at least 70 percent of the optimum soil
moisture content. Two soil moisture evaluations
must be conducted during the first three hours of
active operations during a calendar day, and two
such evaluations during each subsequent fourhour period of active operations.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 262 of 1214 Page 292 of 1692 Rule 403 (cont.) (Amended June 3, 2005)
403-20
Table 2 (Continued)

FUGITIVE DUST

SOURCE CATEGORY

CONTROL ACTIONS
Earth-moving:

Construction cut areas
and mining operations:
(1c) Conduct watering as necessary to prevent visible
emissions from extending more than 100 feet
beyond the active cut or mining area unless the area
is inaccessible to watering vehicles due to slope
conditions or other safety factors.

Disturbed surface areas
(except completed
grading areas)
(2a/b) Apply dust suppression in sufficient quantity and frequency to maintain a stabilized surface. Any
areas which cannot be stabilized, as evidenced by
wind driven fugitive dust must have an application
of water at least twice per day to at least 80 percent
of the unstabilized area.

Disturbed surface
areas: Completed
grading areas
(2c) Apply chemical stabilizers within five working days of grading completion; OR
(2d) Take actions (3a) or (3c) specified for inactive
disturbed surface areas.

Inactive disturbed
surface areas
(3a) Apply water to at least 80 percent of all inactive disturbed surface areas on a daily basis when there is
evidence of wind driven fugitive dust, excluding any
areas which are inaccessible to watering vehicles due
to excessive slope or other safety conditions; OR
(3b) Apply dust suppressants in sufficient quantity and frequency to maintain a stabilized surface; OR
(3c) Establish a vegetative ground cover within 21 days after active operations have ceased. Ground cover
must be of sufficient density to expose less than 30
percent of unstabilized ground within 90 days of
planting, and at all times thereafter; OR
(3d) Utilize any combination of control actions (3a), (3b), and (3c) such that, in total, these actions apply to all inactive disturbed surface areas.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 263 of 1214 Page 293 of 1692 Rule 403 (cont.) (Amended June 3, 2005)
403-21
Table 2 (Continued)

FUGITIVE DUST

SOURCE CATEGORY

CONTROL ACTIONS
Unpaved Roads (4a) Water all roads used for any vehicular traffic at least once per every two hours of active
operations [3 times per normal 8 hour work day];
OR
(4b) Water all roads used for any vehicular traffic
once daily and restrict vehicle speeds to 15 miles
per hour; OR
(4c) Apply a chemical stabilizer to all unpaved road
surfaces in sufficient quantity and frequency to
maintain a stabilized surface.

Open storage piles (5a) Apply chemical stabilizers; OR
(5b) Apply water to at least 80 percent of the surface
area of all open storage piles on a daily basis
when there is evidence of wind driven fugitive
dust; OR
(5c) Install temporary coverings; OR
(5d) Install a three-sided enclosure with walls with no more than 50 percent porosity which extend, at a
minimum, to the top of the pile. This option may
only be used at aggregate-related plants or at
cement manufacturing facilities.

All Categories (6a) Any other control measures approved by the Executive Officer and the U.S. EPA as
equivalent to the methods specified in Table 2
may be used.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 264 of 1214 Page 294 of 1692 Rule 403 (cont.) (Amended June 3, 2005)
403-22
TABLE 3

CONTINGENCY CONTROL MEASURES FOR LARGE OPERATIONS

FUGITIVE DUST
SOURCE

CATEGORY

CONTROL MEASURES
Earth-moving (1A) Cease all active operations; OR
(2A) Apply water to soil not more than 15 minutes prior to moving such soil.

Disturbed surface
areas
(0B) On the last day of active operations prior to a
weekend, holiday, or any other period when active
operations will not occur for not more than four
consecutive days: apply water with a mixture of
chemical stabilizer diluted to not less than 1/20 of the concentration required to maintain a stabilized
surface for a period of six months; OR
(1B) Apply chemical stabilizers prior to wind event; OR (2B) Apply water to all unstabilized disturbed areas 3
times per day. If there is any evidence of wind driven
fugitive dust, watering frequency is increased to a
minimum of four times per day; OR
(3B) Take the actions specified in Table 2, Item (3c); OR (4B) Utilize any combination of control actions (1B), (2B), and (3B) such that, in total, these actions apply to all disturbed surface areas.

Unpaved roads (1C) Apply chemical stabilizers prior to wind event; OR (2C) Apply water twice per hour during active operation; OR
(3C) Stop all vehicular traffic.

Open storage piles (1D) Apply water twice per hour; OR
(2D) Install temporary coverings.

Paved road track-out (1E) Cover all haul vehicles; OR
(2E) Comply with the vehicle freeboard requirements of
Section 23114 of the California Vehicle Code for
both public and private roads.

All Categories (1F) Any other control measures approved by the Executive Officer and the U.S. EPA as equivalent to
the methods specified in Table 3 may be used.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 265 of 1214 Page 295 of 1692 Rule 403 (cont.) (Amended June 3, 2005)
403-23
Table 4
(Conservation Management Practices for Confined Animal Facilities) SOURCE

CATEGORY

CONSERVATION MANAGEMENT PRACTICES
Manure
Handling
(1a)
(1b)
Cover manure prior to removing material off-site; AND
Spread the manure before 11:00 AM and when wind conditions are less than 25 miles per hour; AND
(Only
applicable to
Commercial
Poultry
Ranches)
(1c)
(1d)
Utilize coning and drying manure management by removing manure at laying hen houses at least twice per year and maintain a base of no less than 6 inches of dry manure after clean out; or in lieu of complying with conservation management practice (1c), comply with conservation management practice (1d).

Utilize frequent manure removal by removing the manure from laying hen houses at least every seven days and immediately thin bed dry the material.

Feedstock
Handling
(2a) Utilize a sock or boot on the feed truck auger when filling feed storage bins.

Disturbed
Surfaces
(3a)
(3b)
(3c)
Maintain at least 70 percent vegetative cover on vacant portions of the facility; OR
Utilize conservation tillage practices to manage the amount, orientation and distribution of crop and other plant residues on the soil surface year-round, while growing crops (if applicable) in narrow slots or tilled strips; OR
Apply dust suppressants in sufficient concentrations and frequencies to maintain a stabilized surface.

Unpaved
Roads
(4a)
(4b)
(4c)
Restrict access to private unpaved roads either through signage or physical access restrictions and control vehicular speeds to no more than 15 miles per hour through worker notifications, signage, or any other necessary means; OR
Cover frequently traveled unpaved roads with low silt content material (i.e., asphalt, concrete, recycled road base, or gravel to a minimum depth of four inches); OR
Treat unpaved roads with water, mulch, chemical dust
suppressants or other cover to maintain a stabilized surface.

Equipment
Parking Areas
(5a)
(5b)
Apply dust suppressants in sufficient quantity and frequency to maintain a stabilized surface; OR
Apply material with low silt content (i.e., asphalt, concrete, recycled road base, or gravel to a depth of four inches).

Cudahy Park Renovation Project, Project # PRE-001 Document Control 266 of 1214 Page 296 of 1692 1166-1
(Adopted August 5, 1988)(Amended July 14, 1995)(Amended May 11, 2001) RULE 1166. VOLATILE ORGANIC COMPOUND EMISSIONS FROM

DECONTAMINATION OF SOIL
(a) Applicability
This rule sets requirements to control the emission of Volatile Organic Compounds (VOC) from excavating, grading, handling and treating VOCcontaminated soil as a result of leakage from storage or transfer operations, accidental spillage, or other deposition.
(b) Definitions
(1) EXCAVATION is the process of digging out and removing materials, including any material necessary to that process such as the digging out and removal of asphalt or concrete necessary to expose, dig out and remove known VOC contaminated soil.
(2) GRADING is the process of leveling off to produce a smooth surface including the removal of any material necessary to that process such as asphalt and concrete necessary to expose known VOC contaminated soil. (3) SOIL DECONTAMINATION MEASURE is any process approved by the Executive Officer to remediate, destroy, remove, or encapsulate VOC and VOC-contaminated soil.
(4) UNDERGROUND STORAGE TANK means any one or combination of tanks, including pipes connected thereto, which is used for the storage of organic liquid which is more than 50% beneath the surface of the ground. (5) VOC CONTAMINATED SOIL is a soil which registers a concentration of 50 ppm or greater of Volatile Organic Compounds as measured before suppression materials have been applied and at a distance of no more than three inches from the surface of the excavated soil with an organic vapor analyzer calibrated with hexane.
(6) VOC CONTAMINATED SOIL MITIGATION PLAN is a plan to
minimize VOC emissions to the atmosphere during excavation and any subsequent handling of VOC-contaminated soil.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 267 of 1214 Page 297 of 1692 Rule 1166 (Cont.) (Amended May 11, 2001)
1166-2
(7) VOLATILE ORGANIC COMPOUND (VOC) is any volatile compound of carbon, excluding methane, carbon monoxide, carbon dioxide, carbonic acid, metallic carbides or carbonates, ammonium carbonate, and exempt compounds. Exempt compounds are defined in Rule 102— Definition Of Terms.
(8) VOLATILE ORGANIC MATERIALS include gasoline, diesel, crude oil, lubricant, waste oil, adhesive, paint, stain, solvent, resin, monomer, and/or any other material containing VOC.
(c) Requirements
(1) A person excavating an underground storage tank and/or transfer piping storing or previously storing VOC materials, or excavating or grading soil containing VOC materials shall:
(A) Apply for, obtain and operate pursuant to a mitigation plan approved by the Executive Officer prior to commencement of excavation or handling. The mitigation plan general requirement and application requirements are found in Attachment A to this rule. A copy of the approved plan must be on site during the entire excavation period.
(B) Notify the Executive Officer at least 24 hours prior to excavation using a form approved by the Executive Officer which is fully completed.

If the excavation does not commence on start date, renotification is required.

An alternative notification procedure may be authorized for multiple excavations within a single facility, with prior written approval from the Executive Officer.
(C) Monitor for VOC contamination pursuant to subdivision (e), at least once every 15 minutes commencing at the beginning of excavation or grading and record all VOC concentration readings in a format approved by the Executive Officer; and
(D) When VOC-contaminated soil is detected during excavation or grading:
(i) Implement the approved mitigation plan (Attachment A). (ii) Notify the Executive Officer within 24 hours of detection of VOC-contaminated soil.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 268 of 1214 Page 298 of 1692 Rule 1166 (Cont.) (Amended May 11, 2001)
1166-3
(iii) Monitor and record VOC concentration readings as
prescribed in the plan. Monitoring records must be kept available on site.
(iv) Keep calibration records for all monitoring instruments available on site.
(2) A person handling VOC-contaminated soil at or from an excavation or grading site shall:
(A) Segregate VOC-contaminated stockpiles from non-VOC
contaminated stockpiles such that mixing of the stockpiles does not take place.
(B) Spray VOC-contaminated soil stockpiles with water and/or approved vapor suppressant and cover them with plastic sheeting for all periods of inactivity lasting more than one hour. (C) Conduct a daily visual inspection of all covered VOC contaminated soil stockpiles to ensure the integrity of the plastic covered surfaces. A daily inspection record must be maintained on site.
(D) Comply with the provisions in subparagraph (c) (1)(A) and clause (c)(1)(D)(i).
(E) Maintain a record of the identification and business addresses of the generator, transporter and storage/treatment facilities. Such record shall be signed by each party at the time custody is transferred.
(F) Treat or remove contaminated soil from an excavation or grading site within 30 days from the time of excavation.
(3) If the VOC concentration in the excavated soil is measured at greater than 1000 ppm, spray the soil with water or vapor suppressant and:
(A) As soon as possible, but not more than 15 minutes, place the soil in sealed containers, or
(B) As soon as possible, but not more than 15 minutes, load into trucks, moisten with additional water, cover and transport off site, or
(C) Implement other alternative storage methods approved in writing by the Executive Officer.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 269 of 1214 Page 299 of 1692 Rule 1166 (Cont.) (Amended May 11, 2001)
1166-4
(4) A person treating VOC-contaminated soil shall:
(A) Obtain a permit to construct and operate treatment equipment, as applicable, from the Executive Officer, and
(B) Implement VOC-contaminated soil decontamination measures, as approved by the Executive Officer in writing, which result in Best Available Control Technology applied during all segments, and which include, but are not limited to, at least one of the following:
(i) Installation and operation of an underground VOC
collection system and a disposal system prior to
excavation.
(ii) Collection and disposal of the VOC from the excavated soil on-site using equipment approved by the Executive
Officer.
(iii) Any equivalent VOC-contaminated soil control measure previously approved in writing by the Executive Officer. (5) A person shall not engage in or allow any on-site or off-site spreading, grading or screening of VOC-contaminated soil, which results in uncontrolled evaporation of VOC to the atmosphere.
(6) Loading trucks for contaminated soil must meet the following:
(A) The truck and trailer shall be adequately tarped prior to leaving the site; no excavated materials shall extend above the sides or rear of the truck or trailer to prevent soil spillage during transport, and
(B) The exterior of the truck, trailer and tires shall be cleaned off prior to the truck leaving the site.
(d) Exemptions
(1) The provisions of this rule shall not apply to the following:
(A) Excavation, handling, and treating of less than one (1) cubic yard of contaminated soil.
(B) Removal of soil for sampling purposes.
(C) Accidental spillage of five (5) gallons or less of VOC containing material.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 270 of 1214 Page 300 of 1692 Rule 1166 (Cont.) (Amended May 11, 2001)
1166-5
(2) The provisions of paragraphs (c)(1) and (c)(2) shall not apply to soil excavation or handling as a result of an emergency as declared by an authorized health officer, agricultural commissioner, fire protection officer, or other authorized agency officer. Whenever possible, the Executive Officer shall be notified by telephone prior to commencing such excavation. The Executive Officer shall be notified in writing no later than 48 hours following such excavation. Written notification shall include written emergency declaration from the authorized officer. (e) Test Methods
(1) A person shall measure excavated soils for volatile organic compounds to determine contamination by:
(A) Using an organic vapor analyzer calibrated with hexane, complying with 40 CFR Part 60 Appendix A, EPA Reference Method 21 Section 3 or any equivalent method with prior approval in writing by the Executive Officer. If other calibrating gases are used, then the measured readings shall be correlated to and expressed as hexane.
(B) Placing the probe inlet at a distance of no more than three inches from the surface of the excavated soil and while slowly moving the probe across the soil surface, observe the instrument readout.

If an increased meter reading is observed, continue to sample the excavated soil until the maximum meter reading is obtained.

Leave the probe inlet at this maximum reading location for approximately double the instrument response time. If the maximum observed meter reading is greater than the 50 ppm standard in the regulation, record and report the results. (2) The presence of VOC in stored or spillage materials shall be determined by SCAQMD Method 313 [Determination of Presence of Volatile Organic Compounds (VOC) in Headspace] and/or Method 304 (Determination of Volatile Organic Compounds in Various Materials) contained in the SCAQMD “Laboratory Methods of Analysis for Enforcement Samples” manual.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 271 of 1214 Page 301 of 1692 Rule 1166 (Cont.) (Amended May 11, 2001)
1166-6
(f) Enforcement
(1) Violation of any provision of this rule or the violation of the approved mitigation plan shall be grounds for the Executive Officer to amend or revoke the mitigation plan, in addition to penalties provided by the Health & Safety Code.
(2) If the owner or operator is served with a Notice of Violation for creating a public nuisance, the owner or operator shall suspend operation until the public nuisance is mitigated to the satisfaction of the Executive Officer.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 272 of 1214 Page 302 of 1692 Rule 1166 (Cont.) (Amended May 11, 2001)
1166-7

ATTACHMENT A

GENERAL MITIGATION PLANS REQUIREMENTS
VOC Contaminated Soil Mitigation Plans shall be written to minimize VOC emissions to the atmosphere during excavation, grading, handling and treatment of VOC contaminated soil. VOC Contaminated Soil Mitigation Plans shall consist of three types: Various Locations, Site Specific and Facility Treatment. (1) General Requirements
(A) A plan is not transferable.
(B) A person responsible for the excavation, grading or handling of VOC contaminated soil must be completely familiar with the plan and must adhere to the plan requirement. The Executive Officer may require that the plan be signed by the owner and/or operator. (C) A plan may be amended upon renewal.
(D) Permission to excavate, grade or handle VOC contaminated soil may be withdrawn by the District upon a finding by the Executive Officer that the excavation, grading or handling of the VOC contaminated soil is causing a public nuisance or violating other AQMD rules or regulations.
(2) Various Location Plans:
(A) Shall be limited to the excavation of 2000 cubic yards or less of VOC contaminated soil in any consecutive 12 month period at the same site.
(B) Shall not be used in conjunction with any other various location plan at the same site within a consecutive 12-month period. (C) Shall expire after one year from issuance unless renewed. (D) Shall not be issued for nor used for operations that involve grading, soil treatment or remediation, or landfills.
(3) Site Specific Plans:
(A) Shall be for excavation of greater than 2000 cubic yards of VOC contaminated soil.
(B) Shall be issued for specific excavation or grading locations for a period not to exceed two years.
(C) Shall not be renewable.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 273 of 1214 Page 303 of 1692 Rule 1166 (Cont.) (Amended May 11, 2001)
1166-8
(4) Facility Treatment Plans:
(A) Shall be issued for a treatment facility at a permanent location. (B) Shall expire after one year from issuance unless renewed. (5) Applications for Site Specific Plans shall contain as a minimum:
(A) Reasons for excavation or grading.
(B) Cause of VOC soil contamination and history of the site. (C) Description of tanks or piping associated with the soil contamination.
(D) An estimate of the amount of contaminated soil.
(E) The operating schedule for excavation and removal.
(F) Description of how the excavation or grading will be conducted. (G) Description of mitigation measures for dust, odors and VOC. (H) Details of disposal of VOC contaminated soil, including the ultimate receptor.
(I) Description of monitoring equipment and techniques. (J) A map showing the facility layout, property line, and surrounding area up to 2500 feet away, and including any schools, residential areas or other sensitive receptors such as hospitals or locations where children or elderly people live or work.
(K) Designation of a person who can conduct a site inspection with the Executive Officer prior to issuance of the plan.
(6) Applications for Facility Treatment Plans shall at a minimum:
(A) Include a list of all AQMD permits to construct or operate which have been issued for that treatment and control equipment. (B) Provide for the implementation of VOC-contaminated soil decontamination measures, as approved by the Executive Officer in writing, which result in Best Available Control Technology during all operations.
(C) Provide a map showing the facility layout including the location of all proposed VOC and non-VOC contaminated soil stockpiles. (D) Specify the total amount of VOC contaminated soil proposed to be stockpiled on site.
(E) Provide for VOC contaminated soil stockpiles to be kept moist with water or suppressant and be covered to prevent fugitive emissions.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 274 of 1214 Page 304 of 1692 Rule 1166 (Cont.) (Amended May 11, 2001)
1166-9
(F) Provide for VOC contaminated soil stockpiles to be segregated from non-VOC contaminated soil stockpiles.
(G) Provide for maintenance of records for stockpiles according to the source name, address and dates of reception.
(H) Provide for records of the generator, transporter and storage/treatment facilities and indicate their identification and business addresses. Such records shall be signed by each party at the time custody is transferred.
(I) Provide a map showing the facility layout, property line, and surrounding area up to 2500 feet away, and including any schools, residential area or other sensitive receptors such as hospitals, or locations where children or elderly people live or work.
(J) Designation of a person who can conduct a site inspection with the Executive Officer prior to issuance of the plan.
(K) Specify the operating schedule and maximum amount of VOCcontaminated soil proposed to be remediated on a daily basis. (7) In approving a plan, the Executive Officer require reasonable conditions deemed necessary to ensure the operations comply with the plan and AQMD rules. The conditions may include, but shall not be limited to, procedures for ensuring responsibility for the implementation of the plan, accessibility to the site for AQMD staff, notification of actions required by the plan, identification of emission receptors, monitoring and testing, suppression and covering of stockpiles, prevention of public nuisance from VOC or dust emissions, prevention of fugitive emissions of VOC contaminated soil, loading of truck trailers, and disposal and treatment. (8) In approving a plan, the Executive Officer may require any records deemed necessary to be maintained by the operator to demonstrate compliance with the plan. Such records shall be retained for at least 2 years and be made available to the Executive officer upon request.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 275 of 1214 Page 305 of 1692 1403 - 1
(Adopted October 6, 1989)(Amended April 8, 1994)
(Amended November 3, 2006)(Amended October 5, 2007)
RULE 1403. ASBESTOS EMISSIONS FROM DEMOLITION/RENOVATION

ACTIVITIES
(a) Purpose
The purpose of this rule is to specify work practice requirements to limit asbestos emissions from building demolition and renovation activities, including the removal and associated disturbance of asbestos-containing materials (ACM). The requirements for demolition and renovation activities include asbestos surveying, notification, ACM removal procedures and time schedules, ACM handling and clean-up procedures, and storage, disposal, and landfilling requirements for asbestos-containing waste materials (ACWM). All operators are required to maintain records, including waste shipment records, and are required to use appropriate warning labels, signs, and markings.
(b) Applicability
This rule, in whole or in part, is applicable to owners and operators of any demolition or renovation activity, and the associated disturbance of asbestoscontaining material, any asbestos storage facility, or any active waste disposal site.
(c) Definitions
For the purpose of this rule, the following definitions shall apply:
(1) ACTIVE WASTE DISPOSAL SITE is any disposal site that receives, or has received or processed ACWM within the preceding 365 calendar days. (2) ADEQUATELY WET is the condition of being sufficiently mixed or penetrated with amended water to prevent the release of particulates or visible emissions. The process by which an adequately wet condition is achieved is by using a dispenser or water hose with a nozzle that permits the use of a fine, low-pressure spray or mist.
(3) AMENDED WATER is water to which a chemical wetting agent or surfactant has been added to improve penetration into ACM. (4) ASBESTOS is the asbestiform varieties of serpentine (chrysotile), riebeckite (crocidolite), cummingtonite-grunerite (amosite), anthophyllite, actinolite or tremolite.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 276 of 1214 Page 306 of 1692 Rule 1403 (Cont.) (Amended October 5, 2007)
1403 - 2
(5) ASBESTOS-CONTAINING MATERIAL (ACM) is both friable asbestoscontaining material or Class I nonfriable asbestos-containing material. (6) ASBESTOS-CONTAINING WASTE MATERIAL (ACWM) is any waste that contains commercial asbestos and that is generated by a source subject to the provisions of this rule. ACWM includes, but is not limited to, ACM which is friable, has become friable, or has a high probability of becoming friable, or has been subjected to sanding, grinding, cutting, or abrading, and the waste generated from its disturbance, such as asbestos waste from control devices, particulate asbestos material, asbestos slurries, bags or containers that previously contained asbestos, used asbestoscontaminated plastic sheeting and clothing, and clean-up equipment waste, such as cloth rags or mop heads.
(7) ASBESTOS HAZARD EMERGENCY RESPONSE ACT (AHERA) is
the act which legislates asbestos-related requirements for schools (40 CFR 763, Subpart E).
(8) ASSOCIATED DISTURBANCE of ACM or Class II nonfriable ACM is any crumbling or pulverizing of ACM or Class II nonfriable ACM, or generation of uncontrolled visible debris from ACM or Class II nonfriable ACM.
(9) CLASS I NONFRIABLE ASBESTOS-CONTAINING MATERIAL is
material containing more than one percent (1%) asbestos as determined by paragraph (h)(2), and that, when dry, can be broken, crumbled, pulverized, or reduced to powder in the course of demolition or renovation activities.

Actions which may cause material to be broken, crumbled, pulverized, or reduced to powder include physical wear and disturbance by mechanical force, such as, but not limited to, sanding, sandblasting, cutting or abrading, improper handling or removal or leaching of matrix binders.

Class I nonfriable asbestos-containing material includes, but is not limited to, fractured or crushed asbestos cement products, transite materials, mastic, roofing felts, roofing tiles, cement water pipes and resilient floor covering.
(10) CLASS II NONFRIABLE ASBESTOS-CONTAINING MATERIAL is all other material containing more than one percent (1%) asbestos as determined by paragraph (h)(2), that is neither friable nor Class I nonfriable.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 277 of 1214 Page 307 of 1692 Rule 1403 (Cont.) (Amended October 5, 2007)
1403 - 3
(11) COMMERCIAL ASBESTOS is any material containing asbestos that is extracted from asbestos ore.
(12) CUTTING is penetrating with a sharp-edged instrument and includes sawing, but does not include shearing, slicing, or punching. (13) DEMOLITION is the wrecking or taking out of any load-supporting structural member of a facility and related handling operations or the intentional burning of any facility.
(14) EMERGENCY DEMOLITION is a demolition ordered by a governmental agency for the purpose of eliminating peril to the safety of persons, property or the environment resulting from hazards such as collapse, fire, crime, disease, or toxic contamination or other hazard as determined by the Executive Officer.
(15) EMERGENCY RENOVATION is any renovation that was not planned and results from a sudden unexpected event that results in unsafe conditions. Such events include, but are not limited to, renovations necessitated by non-routine failures of equipment, earthquake or fire damage. An economic burden alone, without a sudden, unexpected event, does not give rise to conditions that meet this definition. (16) ENCAPSULATION is the treatment of ACM with a material that surrounds or embeds asbestos fibers in an adhesive matrix to prevent the release of fibers, as the encapsulant creates a membrane over the surface (bridging encapsulant) or penetrates the material and binds its components together (penetrating encapsulant).
(17) ENCLOSED STORAGE AREA means a storage room, drum, roll-off container, other hard-sided container, or fenced area that is designed to be securely closed with a lock.
(18) FACILITY is any institutional, commercial, public, industrial or residential structure, installation, building; any ship; and any active waste disposal site. A facility is subject to this rule regardless of its current use or function. For example, a facility destroyed by fire, explosion, or natural disaster, including any debris, remains subject to this rule’s provisions.
(19) FACILITY COMPONENT is any part of a facility including foundations and or utility/commodity pipelines; and equipment such as but not limited to heaters, boilers, HVAC, and motors.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 278 of 1214 Page 308 of 1692 Rule 1403 (Cont.) (Amended October 5, 2007)
1403 - 4
(20) FRIABLE ASBESTOS-CONTAINING MATERIAL is material
containing more than one percent (1%) asbestos as determined by paragraph (h)(2), that, when dry, can be crumbled, pulverized, or reduced to powder by hand pressure.
(21) GLOVEBAG is a sealed compartment with attached inner gloves used for handling ACM. When properly installed and used, glove bags provide a small work area enclosure used for small-scale asbestos stripping operations. Information on glovebag installation, equipment, and supplies, and work practices is contained in the Occupational Safety and Health Administration's final rule on occupational exposure to asbestos (Appendix G to 29 CFR 1926.1101(g)).
(22) HIGH EFFICIENCY PARTICULATE AIR (HEPA) FILTER is a filter capable of trapping and retaining at least 99.97 percent of all monodispersed particles of 0.3 micrometer in diameter or larger. (23) INSTALLATION is any building or structure or any group of buildings or structures at a single demolition or renovation site that are under the control of the same owner or operator (or owner or operator under central control).
(24) ISOLATED WORK AREA is the immediate enclosed containment area in which the asbestos abatement activity takes place.
(25) LEAK-TIGHT is the condition whereby any contained solids or liquids are prevented from escaping or spilling out.
(26) LOCKED means rendered securely closed and able to be opened only with a key or access code.
(27) NONSCHEDULED RENOVATION OPERATION is a renovation
operation necessitated by the routine failure of equipment, which is expected to occur within a given calendar year based on past operating experience, but for which an exact date cannot be predicted. (28) OUTSIDE AIR is air outside of the facility or outside of the isolated work area.
(29) OWNER or OPERATOR OF A DEMOLITION OR RENOVATION
ACTIVITY is any person who owns, leases, operates, controls or supervises activities at the facility being demolished or renovated; the demolition or renovation operation; or both.
(30) PERSON is any individual, firm, association, organization, partnership, business, trust, corporation, company, contractor, supplier, installer, user Cudahy Park Renovation Project, Project # PRE-001 Document Control 279 of 1214 Page 309 of 1692 Rule 1403 (Cont.) (Amended October 5, 2007)
1403 - 5
or owner, or any state or local government agency or public district or any other officer or employee thereof. PERSON also means the United States or its agencies to the extent authorized by Federal law. (31) PLANNED RENOVATION is a renovation operation, or a number of such operations, in which the amount of ACM that will be removed or stripped within a given period of time can be predicted. Individual nonscheduled renovation operations are included if a number of such operations can be predicted to occur during a given period of time based on operating experience.
(32) PROJECT is any renovation or demolition activity, including site preparation and clean-up activity.
(33) REMOVAL is the taking out of ACM or facility components that contain or are covered with ACM from any facility.
(34) RENOVATION is the altering of a facility or the removing or stripping of one or more facility components in any way, including, but not limited to, the stripping or removal of ACM from facility components, retrofitting for fire protection, and the installation or removal of heating, ventilation, air conditioning (HVAC) systems. Activity involving the wrecking or taking out of load-supporting structural members are demolitions. (35) RESIDENTIAL SINGLE UNIT DWELLING is a structure that contains only one residential unit. Apartment buildings, townhouses, and condominiums are not residential single unit dwellings. (36) RESILIENT FLOOR COVERING is asbestos-containing floor tile, including asphalt and vinyl floor tile, and sheet vinyl floor covering containing more than one percent (1%) asbestos as determined by paragraph (h)(2).
(37) STRIPPING is the taking off of ACM from any part of a facility or facility component.
(38) STRUCTURAL MEMBER is any load-supporting member of a facility, such as beams and load-supporting walls; or any nonload-supporting member, such as ceilings and nonload-supporting walls.
(39) WASTE GENERATOR is any person who owns or operates a source subject to the provisions of this rule according to subdivision (b), and whose act or process produces ACWM.
(40) WASTE SHIPMENT RECORD is the shipping document, required to be originated and signed by the waste generator, used to track and Cudahy Park Renovation Project, Project # PRE-001 Document Control 280 of 1214 Page 310 of 1692 Rule 1403 (Cont.) (Amended October 5, 2007)
1403 - 6
substantiate the disposition of ACWM as specified by the provisions of subdivision (f).
(41) WORKING DAY is Monday through Friday and includes holidays that fall on any of the days Monday through Friday.
(d) Requirements
A person subject to this rule shall prevent emissions of asbestos to the outside air by complying with the following requirements:
(1) Demolition and Renovation Activities
The owner or operator of any demolition or renovation activity shall comply with the following requirements:
(A) Facility Survey
(i) The affected facility or facility components shall be thoroughly surveyed for the presence of asbestos prior to any demolition or renovation activity. The survey shall include the inspection, identification, and quantification of all friable, and Class I and Class II non-friable asbestoscontaining material, and any physical sampling of materials.
(ii) A thorough survey shall include, at a minimum,
identification of all affected materials at the facility, including but not limited to all layers of flooring materials to the joist level, and all material in the wall or ceiling cavities as necessary to identify and sample them.
(iii) The survey shall be documented with the following information:
(I) The name, address, and telephone number of the
person who conducted the survey;
(II) A written statement of the qualifications of the
person who conducted the survey, demonstrating
compliance with clause (d)(1)(A)(iv);
(III) The dates the survey was conducted;
(IV) A listing of all suspected materials containing any asbestos, a listing of all samples collected, and a
sketch of where the samples were taken;
Cudahy Park Renovation Project, Project # PRE-001 Document Control 281 of 1214 Page 311 of 1692 Rule 1403 (Cont.) (Amended October 5, 2007)
1403 - 7
(V) The name, address, and telephone number of any
laboratory used to conduct analyses of materials for
asbestos content;
(VI) A statement of qualification of the laboratory which conducted the analyses, demonstrating compliance
with paragraph (h)(2);
(VII) A list of the test methods used, demonstrating
compliance with subdivision (h), including
sampling protocols and laboratory methods of
analysis, test data, and any other information used
to identify or quantify any materials containing
asbestos; and
(VIII) A general description of the condition of the
facility, including but not limited to a description of any obvious fire or structural damage.
(iv) Persons conducting asbestos surveys in accordance with subparagraph (d)(1)(A) shall be certified by Cal/OSHA
pursuant to regulations required by subdivision (b) of
Section 9021.5 of the Labor Code, and shall have taken and passed an EPA-approved Building Inspector Course and
conform to the procedures outlined in the Course.
(B) Notification
The District shall be notified of the intent to conduct any demolition or renovation activity. Notifications shall be submitted in a District-approved format which may include but not be limited to U.S. mail, telephone, facsimile, digital, internet, and e-mail.

Telephone, facsimile, digital, and e-mail notifications shall be confirmed with follow-up written notifications to the District postmarked or delivered to the District within 48 hours from submitting the telephone, facsimile, digital, or e-mail notification.

No notification shall be considered received unless it is accompanied by the required fee pursuant to Rule 301, as part of the required written notification. Notifications shall be provided in accordance with the following requirements:
(i) Time Schedule
(I) Demolition or Renovation Activities
Cudahy Park Renovation Project, Project # PRE-001 Document Control 282 of 1214 Page 312 of 1692 Rule 1403 (Cont.) (Amended October 5, 2007)
1403 - 8
The notification shall be submitted to the District no
later than 10 working days before any demolition or
renovation activities other than emergency
demolition, emergency renovation, or planned
renovations involving individual nonscheduled
renovation operations begin.
(II) Planned Renovation - Annual Notification
The District shall be notified by December 17 of the
year preceding the calendar year for which notice is
being given for planned renovation activities which
involve individual nonscheduled renovation
operations.
(III) Emergency Demolition or Renovation
The District shall be notified as soon as possible,
but prior to any emergency demolition or
renovation activity.
(ii) Notification Required Information
All notifications shall include the following information:
(I) An indication of whether the notice is the original or a revised notification;
(II) Name, address and telephone number of both the
owner and operator of the facility, supervising
person, and the asbestos removal contractor, owner
or operator;
(III) Address and location of the facility to be
demolished or renovated and the type of operation:
demolition or renovation;
(IV) Description of the facility or affected part of the facility to be demolished or renovated including the
size (square meters or square feet and number of
floors), age, and present or prior uses of the facility; (V) The specific location of each renovation or
demolition at the facility and a description of the
facility components or structural members
contributing to the ACM to be removed or stripped
from the facility;
Cudahy Park Renovation Project, Project # PRE-001 Document Control 283 of 1214 Page 313 of 1692 Rule 1403 (Cont.) (Amended October 5, 2007)
1403 - 9
(VI) Scheduled project starting and completion dates of demolition or renovation. Notifications shall also
include the ACM removal starting and completion
dates for demolition or renovation; planned
renovation activities involving individual
nonscheduled renovation operations need only
include the beginning and ending dates of the report
period as described in subclause (d)(1)(B)(i)(II);
(VII) Brief description of work practices and engineering controls to be used to comply with this rule,
including asbestos removal and waste handling
emission control procedures;
(VIII) A separate estimate for each of the amounts of
friable, Class I, and Class II nonfriable asbestoscontaining material to be removed from the facility in terms of length of pipe in linear feet, surface area in square feet on other facility components, or
volume in cubic feet if off the facility components.

The total as equivalent surface area in square feet
shall also be reported;
(IX) Name and location of waste disposal site where
ACWM will be deposited.
(X) Description of steps to be followed in the event that unexpected ACM is found or Class II nonfriable
asbestos-containing material becomes crumbled,
pulverized, or reduced to powder;
(XI) California State Contractors License Certification number;
(XII) Cal/OSHA Registration number;
(XIII) Name and location address of off-site storage area for ACWM;
(XIV) Name, address, and telephone number of
transporters used to transport ACWM off-site;
(XV) Procedures, including analytical methods, used to
detect the presence of friable and nonfriable
asbestos-containing material; and
Cudahy Park Renovation Project, Project # PRE-001 Document Control 284 of 1214 Page 314 of 1692 Rule 1403 (Cont.) (Amended October 5, 2007)
1403 - 10
(XVI) Signed certification that at least one person trained as required in subparagraph (d)(1)(G) will supervise
the stripping and removal described by this
notification.
(iii) Emergency Demolition Additional Information
Notification of all emergency demolition activities shall include the following additional information
(I) The agency, name, title, telephone number and
authority of the representative who ordered the
emergency demolition; and
(II) A copy of the order, and the date on which the
demolition was ordered to begin.
(iv) Emergency Renovation Additional Information
Notification of all emergency renovation activities shall include the following additional information:
(I) The name and phone number of the responsible
manager or authorized person who is in charge of
the emergency renovation;
(II) The date and hour that the emergency occurred;
(III) A description of the sudden, unexpected event;
(IV) An explanation of how the event caused an unsafe
condition, or would cause equipment damage or an
unreasonable financial burden; and.
(V) A signed letter from the person directly affected by the emergency, such as the property owner or
property manager, attesting to the circumstances of
the emergency.
(v) Notification Updates
All notifications shall be updated when any of the
following conditions arise:
(I) Change in Quantity of Asbestos
A change in the quantity of affected asbestos of 20
percent or more from the notified amount shall be
reported to the District as soon as the information
becomes available, but not later than the project end
Cudahy Park Renovation Project, Project # PRE-001 Document Control 285 of 1214 Page 315 of 1692 Rule 1403 (Cont.) (Amended October 5, 2007)
1403 - 11
date, unless otherwise specified in an approved
Procedure 5.
(II) Later Starting Date
A delay in the starting date of any demolition or
renovation activity shall be reported to the District
as soon as the information becomes available, but
no later than the original start date.
(III) Earlier Starting Date
A change in the starting date of any demolition or
renovation activity to an earlier starting date shall
be reported to the District no later than 10 working
days before any demolition or renovation activities
begin.
(IV) Completion Date Change
Changes in the completion date shall be reported to
the District at least 2 calendar days before the
original scheduled completion date. In the event
renovations or demolitions are not completed, are
delayed or are completed ahead of schedule, the
District shall be notified as soon as possible, but no
later than the following business day.
(V) Planned Renovation Progress Report
Notifications for on-going planned renovation
operations in which the scheduled starting and
completions dates are more than 1 year apart shall
be updated, every year of the operation by
December 17, unless the most recent written
notification update was postmarked or delivered
after October 1 of that year and include the amount
of ACM removed and the amount of ACM
remaining to be removed.
(C) Asbestos Removal Schedule
Material containing asbestos shall be removed from a facility according to the following schedule:
(i) Burning Demolitions
Cudahy Park Renovation Project, Project # PRE-001 Document Control 286 of 1214 Page 316 of 1692 Rule 1403 (Cont.) (Amended October 5, 2007)
1403 - 12
All ACM and Class II asbestos-containing material shall be removed from a facility prior to any demolition by
intentional burning. All demolition by intentional burning shall be performed in accordance with Rule 444 – Open
Burning.
(ii) Renovations and Non-Burning Demolitions
(I) All ACM shall be removed from a facility being
demolished or renovated before any non-burning
demolition or renovation activity begins that would
break up, dislodge, or similarly disturb the material
or preclude access to the material for subsequent
removal.
(II) ACM not accessible for testing or not discovered
until after the renovation or demolition activities
begin may be removed after the start of the
renovation or non-burning demolition activities,
pursuant to the appropriate procedure in
subparagraph (d)(1)(D).
(III) Notwithstanding the above, asbestos-containing
packings, gaskets, resilient floor covering, and
asphalt roofing products which are not friable and
are not crumbled, cut, abraded, or otherwise not
damaged and in good condition, may be removed
after the start of renovation or non-burning
demolition activities if prior approval from the
District is obtained (Procedure 5).
(IV) If the renovation or demolition activity involves any mechanical force such as, but not limited to,
sanding, sandblasting, cutting, or abrading and thus
would render the materials friable, they must be
removed prior to the renovation or demolition.
(V) If for any reason, any renovation or demolition
results in an associated disturbance of ACM or
Class II nonfriable ACM outside of a containment
or work area then, prior to continuing with any
renovation or demolition activity, the
Cudahy Park Renovation Project, Project # PRE-001 Document Control 287 of 1214 Page 317 of 1692 Rule 1403 (Cont.) (Amended October 5, 2007)
1403 - 13
owner/operator shall secure, stabilize and survey
the affected facility areas and submit and obtain an
approved Procedure 5 plan, prior to any asbestos
clean-up.
(D) Removal Procedures
(i) One or more of the following procedures shall be used when removing or stripping ACM:
(I) Procedure 1 - HEPA Filtration
Remove ACM within an isolated work area. The
following techniques shall be used during
Procedure 1 ACM removal activities:
(1) All stationary objects and surfaces not
intended for removal or stripping of ACM
shall be covered with plastic sheeting;
(2) All air passageways, such as doors,
windows, vents and registers in the work
area, shall be covered and rendered air tight
with plastic sheeting or hard wooden
barriers with studded support. Air
passageways used to provide makeup air for
the isolated work space need not be covered;
(3) All sources of air movement, including the
air-handling system, shall be shut off or
temporarily modified to restrict air
movement into the work zone;
(4) The barriers used for the construction of the
isolated work area shall be equipped with
transparent viewing ports which allow
outside observation of all stripping and
removal of ACM;
(5) The isolated work area shall be vented, with
negative air pressure to a HEPA filtration
system, which shall be operated
continuously from the commencement of
removal activities through the final clean-up
of the work area;
Cudahy Park Renovation Project, Project # PRE-001 Document Control 288 of 1214 Page 318 of 1692 Rule 1403 (Cont.) (Amended October 5, 2007)
1403 - 14
(6) The HEPA filter shall be free of tears,
fractures, holes or other types of damage
and shall be securely latched and properly
situated in the holding frame to prevent air
leakage from the filtration system; and
(7) ACM shall be adequately wet during the
removal process.
(II) Procedure 2 - Glovebag
Remove by the glovebag method or minienclosures
designed and operated according to 29 CFR Section
1926.1101(g), Appendix G, and current Cal/OSHA
requirements.
(III) Procedure 3 - Adequate Wetting
Procedure 3 shall only be used to remove nonfriable
asbestos-containing materials, using the following
techniques:
(1) All exposed ACM shall be adequately wet
during cutting or dismantling procedures.
(2) ACM shall be adequately wet while it is
being removed from facility components
and prior to its removal from the facility.
(3) Drop cloths and tenting shall be used to
contain the work area to the extent feasible.
(4) Only non-power tools shall be used.
(IV) Procedure 4 - Dry Removal
Obtain written approval from the Executive
Officer's designee prior to using dry removal
methods for the control of asbestos emissions when
adequate wetting procedures in the renovation work
area would unavoidably damage equipment or
present a safety hazard. Dry removal methods may
include one or more of the following:
(1) Use of a HEPA filtration system, operated in
accordance with subclause (d)(1)(D)(i)(I),
within an isolated work area;
Cudahy Park Renovation Project, Project # PRE-001 Document Control 289 of 1214 Page 319 of 1692 Rule 1403 (Cont.) (Amended October 5, 2007)
1403 - 15
(2) Use of a glovebag system, operated in
accordance with subclause (d)(1)(D)(i)(II);
or
(3) Use of leak-tight wrapping or an approved
alternative, to contain all ACM removed in
units or sections prior to dismantlement.
(V) Procedure 5 - Approved Alternative
(1) Use an alternative combination of
techniques and/or engineering controls.

Written approval from the Executive Officer
or his designee shall be obtained prior to the
use of a Procedure 5 Approved Alternative.
(2) The Executive Officer may pre-approve
specific combinations of techniques and/or
engineering controls in writing, which may
be used by any person as a Procedure 5
Approved Alternative, subject to such
conditions and limitations as required by the
Executive Officer.
(3) No person shall use a Procedure 5 Approved
Alternative without complying with all of
the conditions and limitations set forth
therein.
(ii) Specific procedure requirements
(I) No person shall remove or strip ACM or Class II
nonfriable ACM that has suffered damage from fire,
explosion, or natural disaster without the use of a
Procedure 5 Approved Alternative.
(E) Handling Operations
All ACWM shall be collected and placed in transparent, leak-tight containers or wrapping. The following techniques shall be used. (i) ACM shall be carefully lowered to the ground or a lower floor without dropping, throwing, sliding, or otherwise damaging or disturbing the ACM;
Cudahy Park Renovation Project, Project # PRE-001 Document Control 290 of 1214 Page 320 of 1692 Rule 1403 (Cont.) (Amended October 5, 2007)
1403 - 16
(ii) ACM which has been removed or stripped more than 50 feet above ground level and was not removed as units or in sections shall be transported to the ground via leak-tight chutes or containers;
(iii) ACWM shall be collected, and sealed in leak-tight containers. ACWM shall be adequately wet prior to and
during collection and packaging. Alternatively, areas of Class I nonfriable asbestos-containing material which have become friable or have been subjected to sanding, grinding, cutting, or abrading, may be sealed via encapsulation; and (iv) All surfaces in the isolated work area shall be cleaned, with a vacuum system utilizing HEPA filtration, wet mopping
and wipe down with water, or by an equivalent methods,
prior to the dismantling of plastic barriers or sealed
openings within the work area.
(F) Freezing Temperature Conditions
When the temperature at the point of wetting is below 0oC (32oF), the wetting provisions of subparagraph (d)(1)(D) shall be superseded by the following requirements:
(i) Facility components containing, coated with, or covered with ACM shall be removed as units or in sections to the maximum extent possible; and
(ii) The temperature in the area containing the facility components shall be recorded at the beginning, middle, and end of each workday during periods when wetting
operations are suspended due to freezing temperatures.

Daily temperature records shall be available for inspection by the District during normal business hours at the
demolition or renovation site. Records shall be retained for at least 2 years.
(G) On-Site Representative
At least one on-site representative, such as a foreman, manager, or other authorized representative, trained in accordance with the provisions of paragraphs (i)(1) and (i)(3), shall be present during the stripping, removing, handling, or disturbing of ACM.

Evidence that the required training has been completed shall be Cudahy Park Renovation Project, Project # PRE-001 Document Control 291 of 1214 Page 321 of 1692 Rule 1403 (Cont.) (Amended October 5, 2007)
1403 - 17
posted at the demolition or renovation site and made available for inspection by the Executive Officer's designee.
(H) On-Site Proof
The following shall be maintained on-site and shall be provided to the District upon request:
(i) California State Contractor's License certification number; (ii) Cal/OSHA Registration number;
(iii) copies of surveys, conducted pursuant to subparagraph (d)(1)(A); and
(iv) copies of notifications submitted pursuant to subparagraph (d)(1)(B).

Proof shall be consistent with the most recently updated information submitted in the notification.
(I) On-Site Storage
No ACWM shall be stored on-site except in a leak-tight container.

When leak-tight containers are not in use, they shall be kept inside an enclosed storage area. The enclosed storage area shall not be accessible to the general public and shall be locked when not in use.
(J) Disposal
All ACWM shall be disposed of at a waste disposal site that is operated in accordance with paragraph (d)(3) of this rule. (K) Container Labeling
Leak-tight containers which contain ACWM shall be labeled as specified in subdivision (e).
(L) Transportation Vehicle Marking
Vehicles used to transport ACWM shall be marked, as specified in subdivision (e), during the loading and unloading of ACWM. (M) Waste Shipment Records
Waste Shipment Records shall be prepared and handled in accordance with the provisions of paragraph (f)(1).
(N) Recordkeeping
Records shall be kept as specified in subdivision (g).
(2) ACWM Storage Facilities
The owner or operator of any ACWM storage facility shall comply with the following requirements:

Cudahy Park Renovation Project, Project # PRE-001 Document Control 292 of 1214 Page 322 of 1692 Rule 1403 (Cont.) (Amended October 5, 2007)
1403 - 18
(A) Maintenance and Handling
(i) ACWM shall be stored in leak-tight containers;
(ii) All leak-tight containers shall be labeled as specified in paragraph (e)(1); and
(iii) ACWM shall be stored in an enclosed locked area.
(B) Transportation Vehicle Marking
Vehicles used to transport ACWM shall be marked, as specified in paragraph (e)(3), during the loading and unloading of ACWM. (C) Waste Shipment Records
Waste Shipment Records shall be handled in accordance with the provisions of paragraph (f)(2).
(D) Recordkeeping
Records shall be maintained as specified in paragraph (g)(2). (3) Active Waste Disposal Sites
The owner or operator of any waste disposal site where ACWM is being deposited shall comply with the following requirements:
(A) Maintenance and Handling
(i) ACWM shall be in leak-tight containers;
(ii) Warning signs, as specified in paragraph (e)(2), shall be displayed at all entrances and at intervals of 330 feet or less along the property line of the site or along the perimeter of the sections of the site where ACWM is being deposited; (iii) Access to the general public shall be deterred by maintaining a fence along the perimeter of the site or by using a natural barrier;
(iv) All ACWM shall be maintained in a separate disposal section;
(v) ACWM deposited at the site shall be covered with at least six (6) inches of nonasbestos-containing material at the end of normal business hours. The waste shall be compacted
only after it has been completely covered with nonasbestoscontaining material. A low pressure water spray or nontoxic dust suppressing chemical shall be used for any surface wetting after compaction; and
(vi) ACWM shall be covered with a minimum of an additional thirty (30) inches of compacted nonasbestos-containing
Cudahy Park Renovation Project, Project # PRE-001 Document Control 293 of 1214 Page 323 of 1692 Rule 1403 (Cont.) (Amended October 5, 2007)
1403 - 19
material prior to final closure of the waste disposal site, and shall be maintained to prevent exposure of the ACWM.
(B) Transportation Vehicle Marking
Vehicles used to transport ACWM shall be marked, as specified in paragraph (e)(3), during the loading and unloading of ACWM. (C) Waste Shipment Records
Waste Shipment Records shall be handled in accordance with the provisions of paragraph (f)(2).
(D) Recordkeeping
Records shall be maintained as specified in paragraph (g)(3). (e) Warning Labels, Signs, and Markings
Warning labels, signs, and markings shall be used to identify asbestos related health hazards and comply with the following requirements:
(1) Leak-Tight Containers
Leak tight containers shall be labeled according to the following requirements:
(A) Warning labels for leak-tight containers and wrapping shall have letters of sufficient size and contrast as to be readily visible and legible, and shall contain the following information, or as specified by Occupational Safety and Health Standards of the Department of Labor, Occupational Safety and Health Administration (OSHA) under 29 CFR 1910.1001(j)(2) or 1926.58(k)(2)(iii), or current Cal/OSHA requirements:

CAUTION
Contains Asbestos Fibers
Avoid Opening or Breaking Container
Breathing Asbestos is Hazardous to Your Health
or
DANGER

CONTAINS ASBESTOS FIBERS

AVOID CREATING DUST

CANCER AND LUNG DISEASE HAZARD
(B) Leak-tight containers that are transported off-site shall be labeled with the name of the waste generator and the location at which the Cudahy Park Renovation Project, Project # PRE-001 Document Control 294 of 1214 Page 324 of 1692 Rule 1403 (Cont.) (Amended October 5, 2007)
1403 - 20
waste was generated. The location description shall include the street address.
(2) Active Waste Disposal Sites
No person shall operate an active waste disposal site unless warning signs are conspicuously posted and meet the following:
(A) Are displayed in such a manner and location that a person can easily read the legend;
(B) Conform to the requirements for 51 cm x 36 cm (20 inch x 14 inch) upright format signs specified in 29 CFR 1910.145 (d)(4) and this paragraph;
(C) Display the following legend in the lower panel with letter sizes and styles of a visibility at least equal to those specified in this subparagraph:

Legend Notation
Asbestos Waste Disposal Site 2.5 cm (1 inch) Sans
Serif, Gothic or Block
Do Not Create Dust 1.9 cm (3/4 inch) Sans
Serif, Gothic or Block
Breathing Asbestos is Hazardous to
Your Health
14 Point Gothic
; and
(D) Have spacing between any two lines at least equal to the height of the upper of the two lines.
(3) Transportation Vehicles
Markings for transportation vehicles shall:
(A) Be displayed in such a manner and location that a person can easily read the legend;
(B) Conform to the requirements for 51 cm x 36 cm (20 inch x 14 inch) upright format signs specified in 29 CFR 1910.145 (d)(4) and this paragraph; and
(C) Display the following legend in the lower panel with letter sizes and styles of a visibility at least equal to those specified in this paragraph:

Cudahy Park Renovation Project, Project # PRE-001 Document Control 295 of 1214 Page 325 of 1692 Rule 1403 (Cont.) (Amended October 5, 2007)
1403 - 21
Legend Notation
DANGER 2.5 cm (1 inch) Sans Serif,
Gothic or Block
ASBESTOS DUST HAZARD 2.5 cm (1 inch) Sans Serif,
Gothic or Block

CANCER AND LUNG DISEASE
HAZARD

1.9 cm (3/4 inch) Sans
Serif, Gothic or Block
Authorized Personnel Only 14 Point Gothic
; and
(D) Have spacing between any two lines at least equal to the height of the upper of the two lines.
(f) Waste Shipment Records
(1) Waste Generators
A waste generator shall comply with the following:
(A) Waste shipment information shall include, but not be limited to, the following:
(i) The name, address, and telephone number of the waste generator;
(ii) The name, address, and telephone number of the South Coast Air Quality Management District;
(iii) The quantity of ACWM in cubic meters or cubic yards; (iv) The name and telephone number of the disposal site owner and operator;
(v) The name and physical site location of the disposal site; (vi) The date transported;
(vii) The name, address, and telephone number of the
transporter; and
(viii) A signed certification that the contents of this consignment are fully and accurately described by proper shipping name and are classified, packed, marked, and labeled, and in proper condition for highway transport according to
applicable federal, state, and local regulations.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 296 of 1214 Page 326 of 1692 Rule 1403 (Cont.) (Amended October 5, 2007)
1403 - 22
(B) A copy of the Waste Shipment Record shall be provided to the disposal site owner or operator at the same time the ACWM is delivered to the disposal site.
(C) If a copy of the Waste Shipment Record, signed by the owner or operator of the designated disposal site, is not received within 35 days of the date the ACWM was accepted by the initial transporter, the transporter and/or the owner or operator of the designated disposal site shall be contacted to determine the status of the waste shipment.
(D) If a copy of the Waste Shipment Record, signed by the owner or operator of the designated disposal site, is not received within 45 days of the date the ACWM was accepted by the initial transporter, a written report shall be submitted to the District and shall include the following:
(i) A copy of the Waste Shipment Record for which a
confirmation of delivery was not received; and
(ii) A signed cover letter explaining the efforts taken to locate the ACWM shipment and the results of those efforts.
(2) Storage and Active Waste Disposal Facilities
The owner or operator of any storage facility or active waste disposal site shall comply with the following requirements:
(A) Waste shipment information shall be filled out on the Waste Shipment Record forms provided by the waste generator, for all ACWM received from an off-site facility, and shall include, but not be limited to, the following:
(i) The name, address, and telephone number of the waste generator;
(ii) The name, address, and telephone number of the
transporter;
(iii) The quantity of ACWM received in cubic meters or cubic yards; and
(iv) The date of receipt.
(B) No shipment of ACWM shall be received from an off-site facility unless it is accompanied with a completed Waste Shipment Record signed by the waste generator.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 297 of 1214 Page 327 of 1692 Rule 1403 (Cont.) (Amended October 5, 2007)
1403 - 23
(C) If there is a discrepancy between the quantity of ACWM designated in the Waste Shipment Record and the quantity actually received, and if the discrepancy cannot be resolved with the waste generator within 15 days of the date the ACWM was received, a written report shall be filed with the District. The report shall include the following:
(i) A copy of the Waste Shipment Record; and
(ii) A signed cover letter explaining the discrepancy, and the attempts to reconcile it.
(D) If any shipment of ACWM is not properly containerized, wrapped, or encapsulated, a written report shall be filed with the District.

The report shall be postmarked or delivered within 48 hours after the shipment is received, or the following business day. (E) A signed copy of the Waste Shipment Record shall be provided to the waste generator no later than 30 calendar days after the ACWM is delivered to the disposal site.
(g) Recordkeeping
(1) Demolition and Renovation Activities
The owner or operator of any demolition or renovation activity shall maintain the following records for not less than three (3) years and make them available to the District upon request:
(A) A copy of all survey-related documents;
(B) A copy of all submitted notifications. A copy of the most recently updated written notification submitted in accordance with the provisions of this rule shall be maintained on-site;
(C) A copy of all written approvals obtained under the requirements of subparagraph (d)(1)(D);
(D) A copy of all Waste Shipment Records;
(E) All training informational materials used by an owner or operator to train supervisors or workers for the purposes of this rule; and (F) A copy of all supervisors and workers training certificates and any annual reaccreditation records which demonstrate EPA-approved or state accreditation to perform asbestos-related work.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 298 of 1214 Page 328 of 1692 Rule 1403 (Cont.) (Amended October 5, 2007)
1403 - 24
(2) Storage Facilities
The owner or operator of any storage facility shall maintain a copy of all Waste Shipment Records on site for not less than three (3) years and make them available to the District upon request.
(3) Active Waste Disposal Sites
The owner or operator of an active waste disposal site shall maintain the following information on site for not less than three (3) years and make them available to the District upon request:
(A) A description of the active waste disposal site, including the specific location, depth and area, and quantity, in cubic meters or cubic yards, of ACWM within the disposal site on a map or diagram of the disposal area;
(B) A description of the methods used to comply with waste disposal requirements; and
(C) A copy of all Waste Shipment Records.
(4) In lieu of the requirements of paragraph (g)(1), the owner or operator of a renovation activity at any facility, in which less than 100 square feet of surface area of ACM on facility components is removed or stripped, may instead elect to maintain the following information for a period of not less than three (3) years, and make it available to the District upon request:
(A) A copy of all survey-related documents;
(B) Records containing an estimate of the amount of ACM removed or stripped at each renovation subject to this paragraph;
(C) Type of removal controls used for each renovation; and (D) A copy of all Waste Shipment Records.
(h) Sampling Protocols and Test Methods
(1) Sampling of materials suspected to contain asbestos, to comply with this rule, shall be conducted following the provisions of 40 CFR Part 763.86. (2) Analysis of materials for asbestos, to comply with this rule, shall be determined by using SCAQMD Method 300-91 as detailed in the District's Laboratory Methods of Analysis for Enforcement Samples manual, or by using the Method specified in Appendix A, Subpart F, 40 CFR Part 763, Section 1, Polarized Light Microscopy. Asbestos analyses performed to comply with this rule must be undertaken by laboratories accredited by the National Voluntary Laboratory Accreditation Program (NVLAP).

Cudahy Park Renovation Project, Project # PRE-001 Document Control 299 of 1214 Page 329 of 1692 Rule 1403 (Cont.) (Amended October 5, 2007)
1403 - 25
(i) Training Requirements
The owner or operator performing a demolition or renovation activity shall provide asbestos-related training as follows:
(1) On-site supervisory personnel shall successfully complete the Asbestos Abatement Contractor/Supervisor course pursuant to the Asbestos Hazard Emergency Response Act (AHERA), and obtain and maintain accreditation as an AHERA Asbestos Abatement Contractor/Supervisor. (2) Workers shall successfully complete the Abatement Worker course pursuant to the AHERA.
(3) Supervisory personnel and workers shall be trained on the provisions of this rule as well as on the provisions of 40 CFR Part 61.145, 61.146,

61.147 and 61.152 (Asbestos NESHAP provisions) and Part 763, and the means by which to comply with these provisions.
(j) Exemptions
(1) The notification requirements of subparagraph (d)(1)(B) and the training requirements of subdivision (i) shall not apply to renovation activities, other than planned renovation activities which involve non-scheduled renovation operations, in which less than 100 square feet of surface area of ACM are removed or stripped.
(2) The notification requirements of subparagraph (d)(1)(B) and the training requirements of subdivision (i) shall not apply to planned renovation activities which involve non-scheduled renovation operations, in which the total quantity of ACM to be removed or stripped within each calendar year of activity is less than 100 square feet of surface area. (3) Clauses (d)(1)(A)(iii)(V), (VI), and (VII) and subclause (d)(1)(B)(ii)(XV) shall not apply to the owner or operator of any renovation or demolition activity, when the suspected material is treated as ACM when being removed, stripped, collected, handled, and disposed of in accordance with the provisions of this rule.
(4) The portion of clause (d)(1)(A)(iv) which requires Cal/OSHA certification shall not apply to persons performing work not subject to the certification requirement established by regulations pursuant to the Labor Code, Section 6501.5.
(5) Subclause (d)(1)(B)(ii)(XI) and clause (d)(1)(H)(i), requiring a California State Contractors License Certification number, shall not apply to persons Cudahy Park Renovation Project, Project # PRE-001 Document Control 300 of 1214 Page 330 of 1692 Rule 1403 (Cont.) (Amended October 5, 2007)
1403 - 26
performing work not subject to the certification requirement established pursuant to the Business and Professions Code, Section 7058.5. (6) Subclause (d)(1)(B)(ii)(XII) and clause (d)(1)(H)(ii), requiring Cal/OSHA registration, shall not apply to persons performing work not subject to the registration requirement established pursuant to the Labor Code, Section 6501.5
(7) The provisions of subparagraph (f)(2)(E) shall not apply to storage facilities that do not meet the definition of an active waste disposal site as defined by paragraph (c)(1).
(8) The handling requirements of phrases (d)(1)(D)(i)(I)(2), (d)(1)(D)(i)(I)(5), and (d)(1)(D)(i)(I)(6), the training requirements of paragraphs (i)(1) and (i)(2), the reporting of training certificate requirement of subclause (d)(1)(B)(ii)(XVI), and the on-site proof of training requirement of subparagraph (d)(1)(G) and subdivision (i) shall not apply to the exclusive removal of asbestos-containing packings, gaskets, resilient floor covering and asphalt roofing products which are not friable, have not become friable, and have not been subjected to sanding, grinding, cutting, or abrading.
(9) The provisions of this rule shall not apply to an owner-occupant of a residential single-unit dwelling who personally conducts a renovation activity at that dwelling.
(10) The survey requirements of subparagraph (d)(1)(A) shall not apply to renovation activities of residential single-unit dwellings in which less than 100 square feet of surface area of ACM are removed or stripped.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 301 of 1214 Page 331 of 1692 1466 - 1
(Adopted July 7, 2017)(Amended December 1, 2017)(Amended June 4, 2021) RULE 1466. CONTROL OF PARTICULATE EMISSIONS FROM SOILS WITH

TOXIC AIR CONTAMINANTS
(a) Purpose
The purpose of this rule is to minimize the amount of off-site fugitive dust emissions containing toxic air contaminants by reducing particulate emissions in the ambient air as a result of earth-moving activities, including, dredging, excavating, grading, earth-cutting and filling, loading, unloading, handling, mechanized land clearing, treating, stockpiling, transferring, and removing of soil that contains applicable toxic air contaminants, from sites that meet the applicability requirements of subdivision (b). (b) Applicability
(1) This rule shall apply to any owner or operator conducting earth-moving activities of soil with applicable toxic air contaminant(s) as defined in paragraph (c)(16) that have been identified as contaminant(s) of concern at a site that has been designated and notified by:
(A) The U.S. Environmental Protection Agency (U.S. EPA) as a Superfund National Priorities List site;
(B) The California Department of Toxic Substances Control (DTSC) as a Brownfield or Cleanup Program site;
(C) The State Water Resources Control Board (State Water Board) or Regional Water Quality Control Board (Regional Water Board) as a Site Cleanup Program site;
(D) A county, local, or state regulatory agency as a Hazardous Material Release site, as defined in California Health and Safety Code Section 25260; or (E) The Executive Officer pursuant to subdivision (i).
(2) This rule shall not apply to:
(A) Earth-moving activities of soil with applicable toxic air contaminant(s) of less than 50 cubic yards; or
(B) Removal of soil for sampling purposes.
(c) Definitions
(1) ADEQUATELY WET means the condition of being sufficiently mixed or penetrated with water to prevent the release of particulates or visible emissions. The process by which an adequately wet condition is achieved is by using a dispenser Cudahy Park Renovation Project, Project # PRE-001 Document Control 302 of 1214 Page 332 of 1692 Rule 1466 (cont.) (Amended June 4, 2021)
1466 - 2
or water hose with a nozzle that permits the use of a fine, low-pressure spray or mist.
(c) (2) ADJACENT ATHLETIC AREA means any outdoor athletic field or park where youth organized sports occur that is in physical contact or separated solely by a public roadway or other public right-of-way to a SCHOOL. (3) ADJOINING means in physical contact with or separated solely by a public roadway or other public right-of-way.
(4) CHEMICAL STABILIZERS means any non-toxic chemicals that are used to bind soil together to control FUGITIVE DUST emissions.
(5) DISTURBED SURFACE AREA means a portion of the earth's surface which has been physically moved, uncovered, destabilized, or otherwise modified from its undisturbed natural soil condition, thereby increasing the potential for FUGITIVE DUST. This definition excludes those areas which have:
(A) Been restored to a natural state, such that the vegetative ground cover and soil characteristics are similar to adjacent or nearby natural conditions; (B) Been paved or otherwise covered by a permanent structure; or (C) Sustained a vegetative ground cover of at least 70 percent of the native cover for a particular area for at least 30 days.
(6) DUST SUPPRESSANTS means water or hygroscopic materials, other than CHEMICAL STABILIZERS, that are used as a treatment material to reduce FUGITIVE DUST emissions.
(7) EARTH-MOVING ACTIVITIES means, for the purpose of this rule, any activity on a site that meets the applicability requirements of subdivision (b) where SOIL WITH APPLICABLE TOXIC AIR CONTAMINANT(S) is being moved or uncovered, including: dredging, excavating, grading, earth-cutting and filling operations, loading, unloading, handling, mechanized land clearing, treating, transferring, removing, and adding to or removing from STOCKPILES, and vehicular movement of equipment associated with these activities. EARTHMOVING ACTIVITIES do not include vehicular movement from: delivery vehicles, passenger vehicles transporting personnel to and from the site, vehicles used for administrative purposes, vehicles transporting personnel for the purposes of soil sampling and conducting ambient PM10 monitoring requirements, watering trucks, and equipment used exclusively on a portion(s) of the site where there is no SOIL WITH APPLICABLE TOXIC AIR CONTAMINANT(S).

Cudahy Park Renovation Project, Project # PRE-001 Document Control 303 of 1214 Page 333 of 1692 Rule 1466 (cont.) (Amended June 4, 2021)
1466 - 3
(c) (8) FUGITIVE DUST means, for the purpose of this rule, any solid particulate matter that is in contact with ambient air and has the potential to become airborne, other than solid particulate matter that is emitted from an exhaust stack. (9) JOINT USE AGREEMENT PROPERTY means a shared public facility in which a formal agreement exists between a SCHOOL and another government entity setting forth the terms and conditions for shared use.
(10) OWNER OR OPERATOR means any firm, business establishment, association, partnership, corporation or individual, whether acting as principal, agent, employee, contractor, or other capacity.
(11) PAVED ROAD means a public or private improved street, highway, alley, public way, or easement that is covered by typical roadway materials, but excludes access roadways that connect a facility with a public paved roadway and are not open to through traffic. Public paved roads are those open to public access and that are owned by any federal, state, county, municipal, or any other governmental or quasigovernmental agencies. Private paved roads are any PAVED ROADS not defined as public.
(12) PROPERTY LINE means the boundary of an area where a person has the legal use or possession of the property. Where such property is divided into one or more subtenancies, the property line(s) shall refer to the boundaries dividing the areas of all sub-tenancies.
(13) SCHOOL means any public or private education center, including juvenile detention facilities with classrooms, used for the education of more than 12 children at the education center in kindergarten through grade 12. A SCHOOL also includes an Early Learning and Developmental Program by the U.S. Department of Education or any state or local early learning and development programs such as preschools, Early Head Starts, Head Start, First Five, and Child Development Centers. A SCHOOL does not include any private education center in which education is primarily conducted in private homes. A SCHOOL includes any building or structure, playground, athletic field, or other area of school property. (14) SLAG means, for the purpose of this rule, the by-product material that is separated from metals during smelting or refining of ore.
(15) SOIL means dirt, sand, gravel, clay, SLAG, and aggregate material less than two inches in length or diameter, and other organic or inorganic particulate matter. (16) SOIL WITH APPLICABLE TOXIC AIR CONTAMINANT(S) means, for the purpose of this rule, SOIL that has been identified by the U.S. EPA, the DTSC, the Cudahy Park Renovation Project, Project # PRE-001 Document Control 304 of 1214 Page 334 of 1692 Rule 1466 (cont.) (Amended June 4, 2021)
1466 - 4
State Water Board, the Regional Water Board, or a county, local, or state regulatory agency, to contain one or more of the applicable toxic air contaminants listed in Table I that exceed action levels as specified by the designating agency, or soil that has been identified by the Executive Officer to contain one or more of the toxic air contaminants listed in Rule 1401 – New Source Review of Toxic Air Contaminants (Table I) or Hazardous Air Pollutants Identified as Toxic Air Contaminants as listed in California Code of Regulations Section 93001, excluding volatile organic compounds regulated under Rule 1166 – Volatile Organic Compound Emissions from Decontamination of Soil.
(c) (17) STABILIZED SURFACE means any previously DISTURBED SURFACE AREA or STOCKPILE, which through the application of CHEMICAL STABILIZERS or DUST SUPPRESSANTS, shows visual or other evidence of surface crusting and is resistant to WIND-DRIVEN FUGITIVE DUST, and is demonstrated to be stabilized. Stabilization can be demonstrated by one or more of the applicable test methods contained in the most current version of the South Coast AQMD Rule 403 Fugitive Dust Implementation Handbook or in Volumes I and II of South Coast AQMD’s Dust Control in the Coachella Valley.
(18) STOCKPILE means any accumulation of SOIL, which is not fully enclosed and which attains a height of three feet or more and a total surface area of 150 square feet or more.
(19) TRACK-OUT means, for the purpose of this rule, any SOIL that adheres to and agglomerates on the exterior surface of motor vehicles, haul trucks, and equipment (including tires) that has been released onto a PAVED ROAD and that can be removed by a vacuum sweeper under normal operating conditions. (20) WIND-DRIVEN FUGITIVE DUST means visible emissions from any DISTURBED SURFACE AREA, which is generated by wind action alone. (d) Monitoring Requirements
(1) When on-site earth-moving activities occur, the owner or operator shall conduct continuous direct-reading near real-time ambient monitoring of PM10 concentrations pursuant to paragraph (d)(3).
(2) If the PM10 concentration exceeds 25 micrograms per cubic meter, as measured pursuant to paragraph (d)(3) and as determined pursuant to paragraph (d)(9), the owner or operator shall cease on-site earth-moving activities, apply dust suppressant to fugitive dust sources, or implement other dust control measures as Cudahy Park Renovation Project, Project # PRE-001 Document Control 305 of 1214 Page 335 of 1692 Rule 1466 (cont.) (Amended June 4, 2021)
1466 - 5
necessary until the PM10 concentration is equal to or less than 25 micrograms per cubic meter averaged over 30 minutes.
(d) (3) The owner or operator conducting on-site earth-moving activities shall install PM10 monitors and conduct ambient PM10 monitoring:
(A) In accordance with a U.S. EPA-approved equivalent method for PM10 monitoring or using a Rule 1466 Approved PM10 Monitor;
(B) Using a minimum of two monitors, placing each monitor as close to the property line as feasible, where:
(i) One or more monitors is in the seasonal prevailing wind direction upwind of the area(s) of on-site earth-moving activity, indicative of background PM10 levels, and not generally influenced by fugitive dust sources from the site; and
(ii) One or more monitors is in the seasonal prevailing wind direction downwind of the area(s) of on-site earth-moving activity; (C) Using PM10 monitors that are identical in: make and model, settings, and configuration; and
(D) Using ambient PM10 monitors that are operated, maintained, and calibrated in accordance with appropriate U.S. EPA-published documents for U.S.

EPA-approved equivalent methods for PM10 and manufacturer’s instructions.
(4) On and before December 31, 2021, the owner or operator shall collect ambient PM10 data with a data acquisition system (DAS) that is capable of logging directreading near real-time data providing the date, time, and PM10 concentration in micrograms per cubic meter every 10 minutes or less.
(5) On and after January 1, 2022, the owner or operator shall collect ambient PM10 data with a DAS that is capable of logging direct-reading near real-time data providing the date and time, calibrated to Pacific Standard Time (PST), and PM10 concentration in micrograms per cubic meter every 1 minute or less. (6) On and after January 1, 2022, the owner or operator shall operate PM10 monitors with the heated sampler inlet on.
(7) On and after January 1, 2022, prior to conducting any on-site earth-moving activities, and weekly thereafter, the owner operator shall conduct intra-instrument precision tests with the PM10 monitors in accordance with Appendix 2 – Procedures to Demonstrate Intra-Instrument Precision, or make available documentation and supporting data certifying that such intra-instrument precision tests were run by an Cudahy Park Renovation Project, Project # PRE-001 Document Control 306 of 1214 Page 336 of 1692 Rule 1466 (cont.) (Amended June 4, 2021)
1466 - 6
equipment rental company or other third party, that demonstrate an intra-instrument precision of:
(d) (7) (A) No more than 25 percent as calculated pursuant to Step 7a in Appendix 2 when ambient PM10 concentrations are equal to or greater than 15 micrograms per cubic meter; or
(B) No more than 5 micrograms per cubic meter as calculated pursuant to Step 7b in Appendix 2 when ambient PM10 concentrations are less than 15 micrograms per cubic meter.
(8) On and after January 1, 2022, each day prior to conducting on-site earth-moving activities, the owner or operator shall conduct a passing zero check on each PM10 monitor in accordance with:
(A) Steps 4 and 5 of Appendix 2 that demonstrates an average PM10 concentration of 0 ± 3 micrograms per cubic meter; or
(B) Manufacturer’s instructions if a monitor is operated using an auto-zero check procedure that directs filtered particle-free air into the measurement chamber.
(9) The owner or operator shall calculate the PM10 concentration as a 120-minute rolling average, where:
(A) The initial average starts at the commencement of on-site earth-moving activities and ends 120 minutes after the commencement of on-site earthmoving activities; (B) On and before December 31, 2021, the averages subsequent to the initial average specified in subparagraph (d)(9)(A) are to be calculated every 10 minutes and cover the previous 120-minute period;
(C) On and after January 1, 2022, the averages subsequent to the initial average specified in subparagraph (d)(9)(A) are to be calculated every 1 minute and cover the previous 120-minute period;
(D) The PM10 concentration is calculated by subtracting the results of the upwind monitor(s) from the downwind monitor(s) for the same averaging period;
(i) If the wind direction is in the seasonal prevailing wind direction, then the monitor(s) described pursuant to clause (d)(3)(B)(i) shall be designated as the upwind monitor(s) and the monitor(s) described pursuant to clause (d)(3)(B)(ii) shall be designated as the downwind monitor(s); and
Cudahy Park Renovation Project, Project # PRE-001 Document Control 307 of 1214 Page 337 of 1692 Rule 1466 (cont.) (Amended June 4, 2021)
1466 - 7
(d) (9) (D) (ii) If there is greater than a ± 90 degree change in wind direction from the seasonal prevailing wind direction, then the monitor(s) described pursuant to clause (d)(3)(B)(i) shall be designated as the downwind monitor(s) and the monitor(s) described pursuant to clause (d)(3)(B)(ii) shall be designated as the upwind monitor(s); (E) If there is more than one upwind monitor, the upwind result is the average concentration of all upwind monitors for the same rolling averaging period; (F) If there is more than one downwind monitor, the downwind result is the maximum concentration of any of the downwind monitors for the same rolling averaging period;
(G) On and before December 31, 2021, when on-site earth-moving activities resume after ceasing pursuant to paragraph (d)(2), the average shall start when on-site earth-moving activities resume and shall end 120 minutes after on-site earth-moving activities resume, and the subsequent averages are to be calculated every 10 minutes and shall cover the previous 120-minute period; and
(H) On and after January 1, 2022, when on-site earth-moving activities resume after ceasing pursuant to paragraph (d)(2), the average shall start when onsite earth-moving activities resume and shall end 120 minutes after on-site earth-moving activities resume, and the subsequent averages are to be calculated every one minute and shall cover the previous 120-minute period.
(10) An owner or operator that elects to move the monitors accordingly when there is a change in wind direction in place of meeting the requirements specified in clauses (d)(3)(B)(i), (d)(3)(B)(ii), (d)(9)(D)(i), and (d)(9)(D)(ii), shall:
(A) Place a minimum of one upwind monitor in the upwind direction of the area(s) of on-site earth-moving activity, indicative of background PM10 levels, and not generally influenced by fugitive dust sources from the site; (B) Place a minimum of one downwind monitor in the downwind direction of the area(s) of on-site earth-moving activity; and
(C) Move the monitor(s) in subparagraph (d)(10)(A) to the new upwind location and the monitor(s) in subparagraph (d)(10)(B) to the new downwind location when there is a change in wind direction.
(11) In the event that a DAS fails to log ambient PM10 data pursuant to paragraph (d)(5) or that the data management system integrated with the PM10 monitor(s) and Cudahy Park Renovation Project, Project # PRE-001 Document Control 308 of 1214 Page 338 of 1692 Rule 1466 (cont.) (Amended June 4, 2021)
1466 - 8
DAS(s) fails to calculate PM10 concentrations pursuant to subparagraph (d)(9)(C) due to a technical issue beyond the reasonable control of an owner or operator, including, but not limited to, internet connection disruptions and computer malfunctions, the owner or operator shall:
(d) (11) (A) Restore the DAS or data management system to working condition as soon as practicable and no later than the start of the next working day; and (B) Manually record the PM10 concentration from the monitor(s) associated with the non-operational DAS once every 10 minutes or less and calculate the PM10 concentration pursuant to the averages specified in subparagraph (d)(9)(B) until the DAS is restored or calculate the PM10 concentration pursuant to the averages specified in subparagraph (d)(9)(B) until the data management system is restored.
(12) When conducting ambient PM10 monitoring as required in paragraph (d)(1), the owner or operator shall monitor wind direction and speed using a minimum of one stationary anemometer or wind sensor that:
(A) Is sited over open, level terrain within the project site with minimal obstructions to the wind flow at a minimum height of eight feet above grade; (B) Meets the performance criteria of:
(i) Wind direction accuracy of ± 7 degrees and resolution of 1 degree; and
(ii) Wind speed accuracy of 2 miles per hour (mph) or ± 5 percent of the observed wind speed, whichever is greater, and resolution of 1 mph; (C) Has a National Institute of Standards and Technology (NIST) Traceability certification;
(D) Is equipped with a data logger that records wind direction and speed data once every 1 minute or less and archives the recorded wind direction and speed data, including the date and time, calibrated to PST; and (E) Is operated, calibrated, and maintained in accordance with manufacturer’s specifications, but no less frequent than once every 6 months of cumulative operation.
(13) The Executive Officer may approve a PM10 monitor to be added as a Rule 1466 Approved PM10 Monitor if the PM10 monitor meets the specifications listed in Appendix 1 – Rule 1466 Approved PM10 Monitors. The request for a PM10 monitor to be added as a Rule 1466 Approved PM10 Monitor shall:
(A) Be submitted to [email protected];
Cudahy Park Renovation Project, Project # PRE-001 Document Control 309 of 1214 Page 339 of 1692 Rule 1466 (cont.) (Amended June 4, 2021)
1466 - 9
(d) (13) (B) Include a description of the PM10 monitor, any accessories, and all monitor specifications; and
(C) Include documentation demonstrating compliance with each specification listed in Appendix 1.
(e) Requirements to Minimize Fugitive Dust Emissions
(1) On and before December 31, 2021, an owner or operator shall not conduct on-site earth-moving activities unless the area is surrounded with fencing that is a minimum of 6 feet tall and at least as tall as the height of the tallest stockpile, with a windscreen that has a porosity of 50 ± 5 percent. A section of the perimeter surrounding an on-site earth-moving activity area may be excluded from this requirement if that section:
(A) Has a solid physical barrier, such as a solid wall or other solid feature that minimizes air flow, that is a minimum of 6 feet tall but at least 6 inches taller than the height of the tallest stockpile; or
(B) Does not have on-site earth-moving activity occurring within 300 feet from the perimeter of that section.
(2) On and after January 1, 2022, an owner or operator shall not conduct on-site earthmoving activities unless the area is surrounded with fencing that is a minimum of 6 feet tall but at least 6 inches taller than the height of the tallest stockpile, with a windscreen that has a porosity of 50 ± 5 percent or a mesh windscreen that has a shade value or opacity of 85 ± 5 percent. A section of the perimeter surrounding an on-site earth-moving activity area may be excluded from this requirement if that section meets the conditions as specified in subparagraph (e)(1)(A) or (e)(1)(B). (3) An owner or operator conducting on-site earth-moving activities shall:
(A) Adequately wet to the depth of earth-moving activity and allow time for penetration; and
(B) Adequately wet at frequencies to prevent the generation of visible dust plumes.
(4) An owner or operator that is moving vehicles on, within, or off a site shall:
(A) Post signs at all entrances of the site to designate the speed limit as 15 mph; (B) Stabilize the surface of all vehicular traffic and parking areas by applying gravel, paving, chemical stabilizers pursuant to paragraph (e)(13), or dust suppressant;
(C) Not allow any track-out outside of the property line that is 25 feet or more in cumulative length. Remove any track-out at a minimum frequency of Cudahy Park Renovation Project, Project # PRE-001 Document Control 310 of 1214 Page 340 of 1692 Rule 1466 (cont.) (Amended June 4, 2021)
1466 - 10
once each day using a vacuum equipped with a filter(s) rated by the manufacturer to achieve a 99.97 percent control efficiency for 0.3 micron particles;
(e) (4) (D) Clean the soil from the exterior of trucks, trailers, and tires prior to the truck leaving the site, without the use of forced air; and
(E) Utilize at least one of the following measures at each vehicle egress from the site to a public road:
(i) Install a pad consisting of washed gravel (minimum-size: 1 inch), maintained in a clean condition, to a depth of at least 6 inches and extending at least 30 feet wide and at least 50 feet long; (ii) Pave the surface extending at least 100 feet from the property line and at least 30 feet wide;
(iii) Utilize a wheel shaker/wheel spreading device consisting of raised dividers (rails, pipes, or grates) at least 24 feet long and 30 feet wide; or
(iv) Install and utilize a wheel washing system to remove soil from tires and vehicle undercarriages.
(5) An owner or operator conducting on-site earth-moving activities shall ensure that stockpiles with any soil with applicable toxic air contaminant(s) be:
(A) Segregated from non-contaminated stockpiles;
(B) Labelled with “South Coast AQMD Rule 1466 – Control of Particulate Emissions from Soils with Toxic Air Contaminant(s) Applicable Soil”; (C) Maintained to avoid steep sides or faces that exceed the angle of repose; (D) No more than 400 cubic yards of soil;
(E) Maintained to minimize fugitive dust emissions containing toxic air contaminants by applying chemical stabilizers pursuant to paragraph (e)(13), applying dust suppressant, or completely covering pursuant to paragraph (e)(14); and
(F) Either chemically stabilized pursuant to paragraph (e)(13) and/or completely covered pursuant to paragraph (e)(14) at all times when earthmoving activities and ambient PM10 monitoring are not occurring. (6) An owner or operator conducting truck and trailer loading activities of soil containing applicable toxic air contaminant(s) shall:
(A) Apply dust suppressant to material prior to loading; (B) Empty the loader bucket slowly so that no visible dust plumes are generated; Cudahy Park Renovation Project, Project # PRE-001 Document Control 311 of 1214 Page 341 of 1692 Rule 1466 (cont.) (Amended June 4, 2021)
1466 - 11
(e) (6) (C) Minimize the drop height from the loader bucket; (D) Maintain at least 6 inches of space between the soil and the top of the truck bed and trailer while transporting within a site; and
(E) Completely cover the truck bed and trailer prior to leaving the site. (7) An owner or operator conducting truck and trailer unloading activities of soil containing applicable toxic air contaminant(s) shall:
(A) Apply dust suppressant to material prior to unloading; and (B) Empty the trailer slowly so that no visible dust plumes are generated. (8) The owner or operator shall immediately remove any spilled soil. (9) The owner or operator shall cease on-site earth-moving activities if the wind speed is greater than 15 mph averaged over a 15-minute period or the instantaneous wind speed exceeds 25 mph.
(10) During on-site earth-moving activities, the owner or operator shall have an on-site dust control supervisor that:
(A) Is employed by or contracted with the owner or operator; (B) Is located on the site during working hours;
(C) Is in a position to expeditiously employ sufficient dust control measures to ensure compliance with all rule requirements;
(D) Has completed the South Coast AQMD Fugitive Dust Control Class and has been issued a valid Certificate of Completion for the class; and (E) Has the following credentials, if asbestos is an applicable toxic air contaminant:
(i) Successfully completed the Asbestos Abatement
Contractor/Supervisor course pursuant to the Asbestos Hazard Emergency Response Act (AHERA), and obtained and maintained accreditation as an AHERA Asbestos Abatement
Contractor/Supervisor; and
(ii) Trained on the provisions of 40 CFR Part 61.145, 61.146, 61.147 and 61.152 (Asbestos NESHAP provisions) and Part 763, and has the means to comply with these provisions.
(11) An owner or operator shall apply a chemical stabilizer pursuant to paragraph (e)(13) and/or use a cover pursuant to paragraph (e)(14) on potential sources of fugitive dust when earth-moving activities are not occurring in the specific location(s) containing the potential source(s) of fugitive dust.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 312 of 1214 Page 342 of 1692 Rule 1466 (cont.) (Amended June 4, 2021)
1466 - 12
(e) (12) An owner or operator shall inspect daily, including days when no on-site earthmoving activities are occurring, labeled stockpiles pursuant to subparagraph (e)(5)(B) and stabilized or covered stockpiles pursuant to (e)(5)(F). (A) For a stabilized stockpile, such inspections shall include a demonstration of stabilization by one or more of the applicable test methods contained in the most current version of the South Coast AQMD Rule 403 Fugitive Dust Implementation Handbook or Volumes I and II of South Coast AQMD’s Dust Control in the Coachella Valley.
(B) For a covered stockpile, such inspections shall include a visual inspection of all seams and plastic cover surfaces to ensure that no portion of the soil is exposed to the atmosphere.
(13) When utilizing a chemical stabilizer, an owner or operator shall:
(A) Ensure the chemical stabilizer meets any specifications, criteria, or tests required by any federal, state, or local agency or any applicable law, rule, or regulation; and
(B) Unless otherwise indicated, use a sufficient concentration of the chemical stabilizer and an application frequency sufficient to maintain a stabilized surface and no less than what is specified by the manufacturer for the period of inactivity.
(14) When using a cover for stockpiles, an owner or operator shall ensure the cover:
(A) Is at least 10 mil thick plastic sheeting that overlaps a minimum of 24 inches; and
(B) Is anchored and secured so that no portion of the soil is exposed to the atmosphere.
(15) An owner or operator that is conducting earth-moving activities of soil with applicable toxic air contaminant(s) at a school, joint use agreement property, adjacent athletic area, or at a site that is adjoining a school, joint use agreement property, or adjacent athletic area shall:
(A) Only conduct earth-moving activities at a school or at a site that is adjoining a school outside of the hours between 7:30 a.m. and 4:30 p.m. on days when the school is in session;
(B) Not conduct earth-moving activities at a school, joint use agreement property, adjacent athletic area, or at a site that is adjoining a school, joint use agreement property, or adjacent athletic area if there is a school sponsored activity or youth organized sports taking place at that site; Cudahy Park Renovation Project, Project # PRE-001 Document Control 313 of 1214 Page 343 of 1692 Rule 1466 (cont.) (Amended June 4, 2021)
1466 - 13
(e) (15) (C) Handle excavated soils with applicable toxic air contaminant(s) by:
(i) Immediately placing soil in a leak-tight container whereby any contained solids or liquids are prevented from escaping or spilling out;
(ii) Directly loading soil in truck beds, trailers, and bins for transport, applying chemical stabilizer pursuant to paragraph (e)(13) or dust suppressant, and completely covering prior to transporting; or (iii) Stockpiling pursuant to paragraph (e)(5), in a fenced area that is not accessible to the general public, and locked when not in use; and (D) Within five days of its excavation, remove all soil with applicable toxic air contaminant(s) from the site.
(f) Notification Requirements
(1) The owner or operator shall electronically submit an initial notification to the Executive Officer, using a format approved by the Executive Officer, of the intent to conduct any on-site earth-moving activities.
(A) Initial notifications shall be submitted:
(i) At least 72 hours but no more than 30 days prior to conducting any earth-moving activities on any site meeting the applicability requirements of subdivision (b); or
(ii) As soon as the information becomes available but no later than 48 hours after the information becomes available that on-site earthmoving activities of soil with applicable toxic air contaminant(s) exceed 50 cubic yards.
(B) Initial notifications shall include the following requirements:
(i) Name, address, telephone number, and e-mail address of the owner or operator;
(ii) Name, telephone number, and e-mail address of the on-site dust control supervisor;
(iii) Project name and, if applicable, the project identification number from the designating agency;
(iv) Project location (address and/or coordinates);
(v) Identify whether the site is a school, joint use agreement property, adjacent athletic area, or is adjoining a school, joint use agreement property, or adjacent athletic area;
Cudahy Park Renovation Project, Project # PRE-001 Document Control 314 of 1214 Page 344 of 1692 Rule 1466 (cont.) (Amended June 4, 2021)
1466 - 14
(f) (1) (B) (vi) A map indicating the specific location(s) of each on-site earthmoving activity and the concentrations of the applicable toxic air contaminant(s) and location of PM10 monitors;
(vii) A description of the on-site earth-moving activities, estimated volume of soil with applicable toxic air contaminant(s), and a schedule that includes the anticipated start and completion dates of on-site earth-moving activities;
(viii) Current and/or previous type of operation(s) and use(s) at the site; (ix) Applicable exemption(s); and
(x) Whether the notice being provided is a revised notification. (2) Notification Updates
Initial notifications pursuant to paragraph (f)(1) shall be updated when any of the following conditions arise:
(A) Earlier Start Date
A change in the start date of on-site earth-moving activities to an earlier date shall be reported to the South Coast AQMD no later than 72 hours before any on-site earth-moving activities begin.
(B) Later Start Date
A delay in the start date of on-site earth-moving activities shall be reported to the South Coast AQMD as soon as the information becomes available, but no later than the original start date.
(C) Change in Exemption Status
Any change(s) in exemption status pursuant to subdivision (k) shall be reported to the South Coast AQMD as soon as the information becomes available, but no later than 48 hours after the information becomes available.
(D) Completion Date
The completion date of on-site earth-moving activities shall be reported to the South Coast AQMD no later than 48 hours after on-site earth-moving activities are completed.
(3) Within 72 hours of an exceedance of the PM10 emission limit specified in paragraph (d)(2), the owner or operator shall electronically submit a notification to the Executive Officer, using a format approved by the Executive Officer, of the exceedance and shall include the following information:

Cudahy Park Renovation Project, Project # PRE-001 Document Control 315 of 1214 Page 345 of 1692 Rule 1466 (cont.) (Amended June 4, 2021)
1466 - 15
(f) (3) (A) Name, address, telephone number, and e-mail address of the owner or operator;
(B) Name, telephone number, and e-mail address of the on-site dust control supervisor;
(C) Project name and, if applicable, the project identification number from the designating agency;
(D) Project location (address and/or coordinates);
(E) PM10 monitoring results and wind direction and speed results pursuant to subdivision (d), including location of monitors, result, date and time of exceedance(s), 12 hours before first exceedance, and 12 hours after last exceedance;
(F) On-site earth-moving activities occurring at the date and time of exceedance(s); and
(G) Dust control measure(s) taken to mitigate fugitive dust. (g) Signage Requirements
When conducting on-site earth-moving activities, the owner or operator shall install and maintain project signage.
(1) Unless otherwise approved in writing by the Executive Officer, signage shall:
(A) Be installed at all entrances and at intervals of 1,000 feet or less along the property line or perimeter of the site, with a minimum of one sign along each side;
(B) Be located between 6 and 8 feet above grade from the bottom of the sign; (C) Display lettering at least 4 inches tall with text contrasting with the sign background; and
(D) Display the following information:
(i) Local or toll-free phone number for the site contact or pre-recorded notification center that is accessible 24 hours a day; and (ii) Warning statement:
“THIS SITE CONTAINS SOILS THAT CONTAIN THE
FOLLOWING CHEMICALS: [LIST APPLICABLE TOXIC AIR
CONTAMINANT(S)]

TO REPORT ANY DUST LEAVING THE SITE PLEASE CALL
[FACILITY CONTACT AND PHONE NUMBER] OR THE

SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT
AT 1-800-CUT-SMOG”.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 316 of 1214 Page 346 of 1692 Rule 1466 (cont.) (Amended June 4, 2021)
1466 - 16
(g) (2) If signage pursuant to paragraph (g)(1) exceeds 48 inches by 96 inches, the owner or operator or designating agency shall include the warning statement referenced in clause (g)(1)(D)(ii), displaying lettering at least 4 inches tall with text contrasting with the sign background, but may use 2.5 inch tall lettering to list applicable toxic air contaminant(s). All other signage requirements set forth in paragraph (g)(1) shall remain the same. If signage continues to exceed 48 inches by 96 inches with these parameters, the owner or operator or designating agency may use alternative signage as set forth in paragraph (g)(3).
(3) The owner or operator or designating agency may use alternative signage approved by the Executive Officer pursuant to subdivision (j). Notwithstanding subdivision (j), the request shall include a visual representation of the alternative sign, including proposed lettering height, and locations and, at a minimum, the alternative signage shall:
(A) Display text contrasting with the sign background; and (B) Display the following warning statement:
“THIS SITE CONTAINS SOILS THAT CONTAIN THE FOLLOWING
CHEMICALS: [LIST APPLICABLE TOXIC AIR CONTAMINANT(S)]

TO REPORT ANY DUST LEAVING THE SITE PLEASE CALL

THE SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT AT
1-800-CUT-SMOG”.
(4) The owner or operator may be excluded from installing and maintaining project signage pursuant to subparagraph (g)(1)(A) at any entrance(s) or interval(s) along the property line or perimeter of the site that is not visible and not accessible to the public unless the site is a school, joint use agreement property, or adjacent athletic area or the site is adjoining a school, joint use agreement property, or adjacent athletic area.
(h) Recordkeeping Requirements
The owner or operator shall maintain records for a period of not less than 3 years and shall make such records available to the Executive Officer upon request. At a minimum, records shall be maintained daily and shall include:
(1) Inspections of all stabilized or covered stockpiles containing soils with applicable toxic air contaminant(s) and all re-stabilization, cover repair, and label maintenance activities, including dates and times the specific activities were conducted; (2) Results of wind and PM10 monitoring, including: ambient PM10 data; rolling average PM10 concentrations and calculations; wind direction and speed Cudahy Park Renovation Project, Project # PRE-001 Document Control 317 of 1214 Page 347 of 1692 Rule 1466 (cont.) (Amended June 4, 2021)
1466 - 17
corresponding to the rolling average PM10 concentrations; movement of monitoring instruments corresponding to wind direction changes; instrument make and model; settings; proof of valid calibration in accordance with manufacturer’s recommended schedule; configuration; calibration, correction, and correlation factors; maintenance; operator training; daily instrument performance check records and manual zero or auto-check results; weekly zero calibration records and intra-instrument precision test data and calculation results; and all instrument logs for all monitoring instruments;
(h) (3) All instrument maintenance activities, including: zero calibration, cleaning, filter replacement, and performance checks, including dates and times of the specific procedures;
(4) Documentation of all DAS and data management system failures, including date and time of the failure, date and time of the correction, the technical issue(s) causing the failure, and activities performed to restore the failed DAS or data management system to working condition;
(5) On-site earth-moving activities conducted and the corresponding volume of soil with applicable toxic air contaminant(s);
(6) Names and business addresses of the transporting and receiving facilities, and a copy of the shipping manifest;
(7) Complaints called in, including the name of complainant and contact information, date and time, on-site earth-moving activities occurring at the date and time, complaint, and action taken to mitigate the source of the complaint; and (8) A copy of all submitted notifications for the project. (i) Executive Officer Designated Sites
(1) The Executive Officer may designate a site if the Executive Officer has evidence that the site contains soil with applicable toxic air contaminant(s) as defined in paragraph (c)(16), after consultation with U.S. EPA, DTSC, the State Water Resources Control Board, the Regional Water Quality Control Board, and/or local, county, or state regulatory agencies, and consideration of the following:
(A) Site history, including current and/or previous type(s) of operation(s) and use(s) at the site and regulatory history;
(B) Concentration(s) of applicable toxic air contaminant(s) in the soil; (C) Background concentration(s) of applicable toxic air contaminant(s); (D) Volume of soil with applicable toxic air contaminant(s); Cudahy Park Renovation Project, Project # PRE-001 Document Control 318 of 1214 Page 348 of 1692 Rule 1466 (cont.) (Amended June 4, 2021)
1466 - 18
(i) (1) (E) Distance to a residence, park, school, joint use agreement property, adjacent athletic area, or a site adjoining a school, joint use agreement property, or adjacent athletic area;
(F) Meteorological data;
(G) Health risk information or other data provided by the owner or operator, if available; and
(H) Ambient monitoring data and other applicable data, if available. (2) Prior to making a determination, the Executive Officer will notify the owner or operator in writing that the site may be subject to this rule. (A) In the event the owner or operator exercises this opportunity to demonstrate that this rule does not apply, the owner or operator shall submit information to the Executive Officer within 14 days of the notification substantiating why the site should be excluded from this rule.
(B) Upon final determination, the Executive Officer will notify the owner or operator in writing if the site is subject to this rule. (3) During the determination period, the owner or operator shall comply with the provisions of this rule or cease all on-site earth-moving activities until a determination is made.
(j) Alternative Provisions
(1) If requesting an alternative provision pursuant to paragraph (g)(3), the owner or operator or designating agency shall submit the request in writing at least 30 days prior to conducting any earth-moving activities and include all information to the Executive Officer to substantiate its position.
(2) The Executive Officer may request additional information from the owner or operator or designating agency.
(3) The owner or operator or designating agency shall submit all requested information within 14 days of the request for additional information. (4) The Executive Officer will review the request for an alternative provision and will approve or reject the data and notify the owner or operator or designating agency in writing. Approved alternative provisions may not be used retroactively. (5) Alternative provisions that were approved and notified in writing by the Executive Officer before June 4, 2021 shall be deemed compliant with the requirements of the applicable provisions of the rule, shall remain in effect only for the period of time and for the specific project for which they were granted, and shall not be renewed or extended.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 319 of 1214 Page 349 of 1692 Rule 1466 (cont.) (Amended June 4, 2021)
1466 - 19
(k) Exemptions
(1) The owner or operator may be exempt from one or more provisions of this rule provided there is written confirmation that the designating agency under subparagraphs (b)(1)(A) through (b)(1)(D) has consulted with the Executive Officer and has determined that the provision(s) are not needed based on information specified in subparagraphs (i)(1)(A) through (i)(1)(H). (2) On-site earth-moving activities performed within an enclosed system vented to South Coast AQMD permitted air pollution control equipment shall be exempt from all requirements except: subparagraphs (e)(4)(C) through (e)(4)(E), subparagraphs (e)(6)(D) and (e)(6)(E), and subdivisions (f), (g), and (h). (3) Linear trenching for natural gas, power, sewer, and water projects on roadways with soil with applicable toxic air contaminant(s), directly loaded into a truck bed, trailer, or bin for transport, shall be exempt from all requirements except: paragraphs (e)(3) through (e)(9), paragraphs (e)(13) and (e)(15), and subdivisions (f), (h), and (i). (4) On-site earth-moving activities consisting only of excavation activities of soil with applicable toxic air contaminant(s) of less than 500 cubic yards, directly loaded into a truck bed, trailer, or bin for transport, shall be exempt from all requirements except: paragraphs (e)(3) through (e)(9), paragraphs (e)(13) and (e)(15), and subdivisions (f), (h), and (i).
(5) On-site earth-moving activities conducted during emergency life-threatening situations, or in conjunction with any officially declared disaster or state of emergency as declared by an authorized health officer, agricultural commissioner, fire protection officer, or other authorized agency officer shall be exempt from all requirements. The Executive Officer shall be notified electronically no later than 48 hours following such on-site earth-moving activities. Written notification shall include written emergency declaration from the authorized officer. (6) On-site earth-moving activities conducted by essential service utilities to provide electricity, natural gas, telephone, water, or sewer during periods of service outages and emergency disruptions shall be exempt from all requirements. The Executive Officer shall be notified electronically no later than 48 hours following such on-site earth-moving activities.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 320 of 1214 Page 350 of 1692 Rule 1466 (cont.) (Amended June 4, 2021)
1466 - 20
Table I – Applicable Toxic Air Contaminants
CAS Number Substance
7440-38-2
7784-42-1
arsenic and arsenic compounds (inorganic)
including, but not limited to:
arsenic compounds (inorganic)
arsine
1332-21-4 Asbestos
7440-43-9 cadmium and cadmium compounds
57-74-9 chlordane

1746-01-6
40321-76-4
39227-28-6
57653-85-7
19408-74-3
35822-46-9
3268-87-9
41903-57-5
36088-22-9
34465-46-8
37871-00-4
dibenzo-p-dioxins (chlorinated)
tetrachlorodibenzo-p-dioxin, 2,3,7,8-
pentachlorodibenzo-p-dioxin, 1,2,3,7,8-
hexachlorodibenzo-p-dioxin, 1,2,3,4,7,8-
hexachlorodibenzo-p-dioxin, 1,2,3,6,7,8-
hexachlorodibenzo-p-dioxin, 1,2,3,7,8,9-
heptachlorodibenzo-p-dioxin, 1,2,3,4,6,7,8-
octachlorodibenzo-p-dioxin, 1,2,3,4,6,7,8,9-
total tetrachlorodibenzo-p-dioxin
total pentachlorodibenzo-p-dioxin
total hexachlorodibenzo-p-dioxin
total heptachlorodibenzo-p-dioxin
72-54-8 dichlorodiphenyldichloroethane
72-55-9 dichlorodiphenyldichloroethylene
50-29-3 dichlorodiphenyltrichloroethane
Cudahy Park Renovation Project, Project # PRE-001 Document Control 321 of 1214 Page 351 of 1692 Rule 1466 (cont.) (Amended June 4, 2021)
1466 - 21
Table I – Applicable Toxic Air Contaminants (cont.)
CAS Number Substance
18540-29-9
10294-40-3
13765-19-0
7758-97-6
10588-01-9
7789-06-2
13530-65-9
chromium (hexavalent) and chromium compounds
including, but not limited to:
barium chromate
calcium chromate
lead chromate
sodium dichromate
strontium chromate
zinc chromate
7439-92-1
301-04-2
7758-97-6
7446-27-7
1335-32-6
lead and lead compounds (inorganic, including elemental lead)
including, but not limited to:
lead compounds (inorganic)
lead acetate
lead chromate
lead phosphate
lead subacetate
7439-97-6
7487-94-7
593-74-8
mercury and mercury compounds (inorganic)
including, but not limited to:
mercuric chloride
methyl mercury
Cudahy Park Renovation Project, Project # PRE-001 Document Control 322 of 1214 Page 352 of 1692 Rule 1466 (cont.) (Amended June 4, 2021)
1466 - 22
Table I – Applicable Toxic Air Contaminants (cont.)
CAS Number Substance
7440-02-0

373-02-4
3333-67-3
13463-39-3
12054-48-7
1313-99-1
12035-72-2
1271-28-9
nickel and nickel compounds
including, but not limited to:
nickel acetate
nickel carbonate
nickel carbonyl
nickel hydroxide
nickel oxide
nickel subsulfide
nickelocene
refinery dust from the pyrometallurgical process
1336-36-3
32598-13-3
70362-50-4
32598-14-4
74472-37-0
31508-00-6
65510-44-3
57465-28-8
38380-08-4
69782-90-7
52663-72-6
32774-16-6
39635-31-9
polychlorinated biphenyls (PCBs)
3,3’,4,4’-tetrachlorobiphenyl (PCB 77)
3,4,4’,5-tetrachlorobiphenyl (PCB 81)
2,3,3’,4,4’-pentachlorobiphenyl (PCB 105)
2,3,4,4’,5-pentachlorobiphenyl (PCB 114)
2,3’,4,4’,5-pentachlorobiphenyl (PCB 118)
2,3',4,4',5'-pentachlorobiphenyl (PCB 123)
3,3’,4,4’,5-pentachlorobiphenyl (PCB 126)
2,3,3’,4,4’,5-hexachlorobiphenyl (PCB 156)
2,3,3’,4,4’,5’-hexachlorobiphenyl (PCB 157)
2,3’,4,4’,5,5’-hexachlorobiphenyl (PCB 167)
3,3’,4,4’,5,5’-hexachlorobiphenyl (PCB 169)
2,3,3’4,4’,5,5’-heptachlorobiphenyl (PCB 189)
Cudahy Park Renovation Project, Project # PRE-001 Document Control 323 of 1214 Page 353 of 1692 Rule 1466 (cont.) (Amended June 4, 2021)
1466 - 23
Table I – Applicable Toxic Air Contaminants (cont.)
CAS Number Substance

56-55-3
50-32-8
205-99-2
207-08-9
218-01-9
53-70-3
193-39-5
polycyclic aromatic hydrocarbons (PAHs)
benzo[a]anthracene
benzo[a]pyrene
benzo[b]fluoranthene
benzo[k]fluoranthene
chrysene
dibenz[a,h]anthracene
indeno[1,2,3-c,d]pyrene

Cudahy Park Renovation Project, Project # PRE-001 Document Control 324 of 1214 Page 354 of 1692 Rule 1466 (cont.) (Amended June 4, 2021)
1466 - 24
Appendix 1 – Rule 1466 Approved PM10 Monitors
The Executive Officer may approve PM10 monitors that meet the following physical and performance requirements.

1. Physical Requirements

1.1. PM10 monitors shall be continuous direct-reading near-real time monitors and shall monitor particulate matter less than 10 microns.

1.2. PM10 monitors shall be equipped with:

1.2.a. Omni-directional heated sampler inlet;

1.2.b. Sample pump with active flow control mechanism;

1.2.c. Enclosure;

1.2.d. Data logger capable of logging each data point with average concentration, time, date, and data point number; and

1.2.e. Conductive tubing that minimizes particle loss for any external tubing used to carry sampled air prior to measurement.

2. Performance Requirements

2.1 PM10 monitors shall have the following minimum performance standards:

2.1.a. Range: 0 - 10,000 µg/m3;

2.1.b. Accuracy, determined through factory testing against a U.S. EPA Federal Reference Method or Federal Equivalent Method, for a minimum of 30 measurements each averaged over 24 hours, to show:

2.1.b.i. ± 5% of reading ± precision; or

2.1.b.ii. Coefficient of determination (R2) of ≥ 0.95 through simple linear regression;

2.1.c. Resolution: 1.0 µg/m3;

2.1.d. Flow control accuracy of ± 5% of factory setpoint; and

2.1.e. Measurement Cycle: User selectable (30 minute and 2 hour).

2.2 Monitors that have a valid Monitoring Certification Scheme certification meeting the latest version of the Monitoring Certification Scheme (MCERTS): Performance Standard for Indicative Ambient Particulate Monitors may be exempt from meeting the performance requirements listed above, but shall meet all stated physical requirements.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 325 of 1214 Page 355 of 1692 Rule 1466 (cont.) (Amended June 4, 2021)
1466 - 25

3. Quality Assurance/Quality Control Requirements
In order to ensure the validity of the PM10 measurements performed, there shall be appropriate Quality Assurance/Quality Control (QA/QC). It is the responsibility of the owner or operator to adequately supplement QA/QC Plans to include the following critical features: instrument calibration, instrument maintenance, operator training, and daily instrument performance checks.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 326 of 1214 Page 356 of 1692 Rule 1466 (cont.) (Amended June 4, 2021)
1466 - 26
Appendix 2 – Procedures to Demonstrate Intra-Instrument Precision An owner or operator shall perform the following procedures to demonstrate the intra-instrument precision of all PM10 monitors as required in paragraph (d)(7).

1. Ensure monitors are identical in make and model, settings, and configuration.

2. Ensure monitor inlets are at the same height and located within 4 meters of each other but no less than 1 meter apart for the duration of the test.

3. Power on the monitors and turn on the heated sampler inlet. Allow the monitors to warmup per manufacturer’s recommendations or when readings have stabilized.

4. For each monitor, conduct a zero calibration in accordance with manufacturer’s instructions, then conduct a manual zero check by removing any sampling inlet and installing a filter, rated by the manufacturer to achieve a 99.97 percent control efficiency for 0.3 micron particles, on the inlet of the monitor for a minimum of 10 minutes. If the monitors are operated using an auto-zero check procedure that directs filtered particle-free air into the measurement chamber, conduct the zero check in accordance with manufacturer’s instructions.

5. Log the PM10 concentration reading every minute, and calculate and record the average of the readings of the manual zero check. The average of the manual zero check readings shall be 0 ± 3 micrograms per cubic meter before proceeding to Step 6. If conducting an autozero check, the monitor shall pass the zero check in accordance with manufacturer’s instructions before proceeding to Step 6. If any monitors fail either the manual zero check or the auto-zero check, the owner or operator shall conduct a zero calibration in accordance with manufacturer’s instructions and/or correct any issue(s) causing the failure, followed by conducting a passing zero check on the PM10 monitor(s) in accordance with Steps 4 and

5. 6. Remove the filter and install the monitor inlet as required. After waiting 10 minutes, operate the monitors simultaneously and log the PM10 concentration reading every minute for a minimum of 60 minutes.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 327 of 1214 Page 357 of 1692 Rule 1466 (cont.) (Amended June 4, 2021)
1466 - 27

7. Calculate the intra-instrument precision using either of the following equations:
a. Intra-instrument precision in relative standard deviation or correlation of variation (%) when ambient PM10 concentrations are greater than or equal to 15 micrograms per cubic meter:

𝑃𝑃 =
𝑆𝑆𝑡𝑡
𝐶𝐶𝑡𝑡
𝑥𝑥 100%
where,
P = Intra-instrument precision in percent (%);
St = Standard deviation of the averaged PM10 concentration readings from all tested monitors over the time t of testing duration, to be calculated as:

𝑆𝑆𝑡𝑡 = �∑(𝑥𝑥𝑖𝑖 − 𝑥𝑥̅)2
(𝑛𝑛 − 1)
where,
xi = Mean of the PM10 concentration readings for a tested monitor over time t of testing duration,
𝑥𝑥̅= Mean of the averaged PM10 concentration readings from all tested monitors over the time t of testing duration, and 𝑛𝑛 = Number of tested monitors; and
Ct = Mean of the averaged PM10 concentration readings from all tested monitors over the time t of testing duration; or
b. Intra-instrument precision in absolute value (micrograms per cubic meter) when ambient PM10 concentrations are less than 15 micrograms per cubic meter:

𝑃𝑃 = 𝑆𝑆𝑡𝑡
where,
P = Intra-instrument precision in micrograms per cubic meter, and St = Standard deviation of the averaged PM10 concentration readings from all tested monitors over the time t of testing duration.

8. Record the results of the calculations.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 328 of 1214 Page 358 of 1692 CONVERSE Project No. 24-41-114-02
Copyright 2025 CONVERSE CONSULTANTSAppendix C
Health and Safety Plan
Cudahy Park Renovation Project, Project # PRE-001 Document Control 329 of 1214 Page 359 of 1692 Appendix C
Health and Safety Plan
Soil Management Plan
Cudahy Park Renovation Project
5220 Santa Ana Street
Cudahy, California
Prepared for
Willdan
2401 East Katella Avenue, Suite 300
Anaheim, California 92806
Prepared By
Converse Consultants
717 South Myrtle Avenue
Monrovia California 91016
February 27, 2025
Cudahy Park Renovation Project, Project # PRE-001 Document Control 330 of 1214 Page 360 of 1692 Converse Project No. 24-41-114-02 i
Appendix C
Health and Safety Plan
Cudahy Park Renovation Project
5220 Santa Ana Street
Cudahy, California
Page

1.0 INTRODUCTION............................................................................................................... 1

2.0 SITE BACKGROUND ....................................................................................................... 1

3.0 PROJECT SAFETY PERSONNEL ................................................................................... 2

4.0 SCOPE OF WORK ........................................................................................................... 4

5.0 SITE HAZARD ANALYSIS................................................................................................ 4

6.0 GENERAL HEALTH AND SAFETY REQUIREMENTS .................................................... 8

7.0 EXPOSURE MONITORING PLAN .................................................................................12

8.0 SITE CONTROL..............................................................................................................14

9.0 PERSONNEL PROTECTIVE EQUIPMENT....................................................................19

10.0 DECONTAMINATION METHODS ..................................................................................23

11.0 EMERGENCY RESPONSE PROCEDURES..................................................................25 Figure 1 – Tail Gate Safety Meeting Form
Figure 2 - Hospital Route Map
Cudahy Park Renovation Project, Project # PRE-001 Document Control 331 of 1214 Page 361 of 1692 Converse Project No. 22-16-144-02 1

1.0 INTRODUCTION
This Health and Safety Plan (HASP) has been prepared by Converse Consultants (Converse).

Converse was retained by Willdan, to prepare a Soil Management Plan (SMP) for the for the proposed Cudahy Park Renovation Project.

2.0 SITE BACKGROUND
In January 2015, the City of Cudahy and State of California Department of Toxic Substances Control (DTSC) signed a Covenant to Restrict Use of Property (Covenant), Environmental Restriction, County of Los Angeles, Assessor Parcel Number 6224-014-905. Pursuant to Civil Code Section 1471, the DTSC determined that the Covenant was reasonably necessary to protect present or future human health or safety or the environment as a result of the presence on the land of hazardous materials as defined in Health and Safety Code Section 25260.

Pursuant to Civil Code Section 1471, and Health and Safety Code Section 25355.5, the City of Cudahy and DTSC agreed that the use of the Site be restricted as set forth in the Covenant.

According to the Covenant, the Site was remediated pursuant to a Removal Action Workplan (RAW) developed under Chapter 6.8 of division 20 of the Health and Safety Code, under the oversight of DTSC. The RAW provided that a deed restriction be required as part of the site remediation, because lead, benzo(a)pyrene, toluene, and xylenes, remain at depths of one-foot or more below the surface of the Tree Boundary Area and River Road Area. Following approval of the RAW, soils were excavated to depths of 8 to 14 feet below ground surface (bgs), graded, and then backfilled with clean soil. As detailed in the Final Removal Action Completion Report that was approved by DTSC on December 8, 2005, a portion of the subsurface soils within 10 feet of the surface of the Tree Boundary Area contain hazardous substances including lead (1,103 parts per million [ppm]), benzo(a)pyrene (4.18 ppm), benzene (1.3 ppm), toluene (2.3 ppm), and xylenes (2.9 ppm). The soils underneath the River Road Area within 10 feet of the surface contain lead (2,160 ppm), and benzo(a)pyrene (2.71 ppm). The DTSC further concluded that the remainder of the Site, as remediated, does not present an unacceptable threat to human safety or the environment.

Section 4.02 of Article IV of the Covenant provided the following restrictions pertaining to Soil Management:
a) No activities that will disturb the soil (e.g. excavation, grading, removal, trenching, filling, earth movement or mining) shall be allowed on the Tree Boundary Area or under River Road without a Soil Management Plan and Health and Safety Plan approved by the DTSC.
b) Any contaminated soils brought to the surface by grading, excavation, trenching, or backfilling shall be managed in accordance with all applicable provisions of state and federal law.
c) The Owner shall provide the DTSC written notice at least 14 days prior to any building, filling, grading, mining, or excavating in the Tree Boundary Area or under River Road.

The Covenant covers two (2) specific areas of the Site, identified as the “Tree Boundary Area” and “River Road Area”.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 332 of 1214 Page 362 of 1692 Converse Project No. 24-41-114-02 2

2.1 SITE LOCATION
Cudahy Park is located at 5220 Sant Ana Street in the City of Cudahy, Los Angeles County, California. Cudahy Park is generally bounded by Park Avenue Elementary School to the north, River Road to the east, and residences to the south and west. The SMP covers both the Tree Boundary and River Road portions of Cudahy Park. The Tree Boundary Area is located in the area now generally bounded by the basketball court and parking lot on the north, River Road on the east, and baseball fields on the south and west. The River Road Area is located at the eastern part of Los Angeles County Assessor’s Parcel No. 6224-014-905.

2.2 CLIMATE
Cudahy has a Mediterranean climate with hot, dry summers and mild, damp winters, and a large amount of sunshine year-round. Summers are characterized by sunny days and very little rainfall during June through September. Fall brings cooler temperatures and occasional showers, as well as seasonal Santa Ana winds originating from the northeast.

Prevailing winds are generally from the northeast and rarely exceed 9 miles per hour (mph).

Greatest wind velocities are generally associated with the Santa Ana Winds season, typically in late October through November, and can reach 80+ mph.

3.0 PROJECT SAFETY PERSONNEL
This HASP has been prepared by Converse. The Consultant (to be hired by the Project Proponent [PP]) is responsible for ensuring compliance of their personnel, subcontractor personnel, and visitors to the Site with the HASP and its provisions. The Corporate Health and Safety Officer (CHSO), Project Health and Safety Officer (PHSO), and Site Health and Safety Officer (SHSO) are responsible for the distribution of this HASP and for the compliance audit.

It is anticipated that the PHSO, SHSO, and Project Field Supervisor (PFS) will be the same person.

3.1 Corporate Health and Safety Officer
The CHSO is to be determined (TBD) and they will be responsible for the following:
• Establishing all corporate health and safety procedures • Distributing this corporate HASP and enforcing the provisions outlined herein • Ensuring that the company is in compliance with all Federal, State, and local guidelines regarding health and safety issues
• Confirming that all employees have appropriate health and safety training and have taken a current respirator fit test as outlined in the Consultant’s Respiratory Protection Program
• Verifying that all employees are current in the Consultant’s Medical Screening Program
• Maintaining records regarding employee safety training, respirator fit testing, and medical screening
• Reporting all accidents to the necessary authorities.

With regard to this project, the CHSO has the same authority as the PHSO and SHSO.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 333 of 1214 Page 363 of 1692 Converse Project No. 24-41-114-02 3

3.2 Project Manager
The PM is: TBD
The Project Manager (PM) is responsible for the overall performance and compliance with applicable regulations and procedural guidelines as specified in this HASP. The PM is also responsible for implementing the provisions of this HASP. Implementation includes review of field personnel compliance with the Consultant’s medical examination requirements, training of field personnel involved with the project, provision of appropriate safety equipment, and submittal of the required health and safety documents to the PHSO. In the event that the PM becomes aware of a deficiency in the implementation of the HASP, they will take appropriate action by consulting with the PHSO and provide all affected personnel with appropriate written documentation. The authority of the PM is the same as the PHSO.

3.3 Project Health and Safety Officer
The PHSO is: TBD
The PHSO will make daily assessments of health and safety practices at the Site. The PHSO will observe operating personnel and authorized visitors for indications of impaired health due to contaminant exposure, heat stress, or other hazards.

The PHSO will evaluate whether Site conditions present hazards not previously predicted or expected, and will inspect personal protective equipment and verify its use. The PHSO is also responsible for assisting the PM with on-site implementation of this HASP, including maintaining safety equipment supplies, performing air monitoring of the breathing zones of workers (if deemed necessary), and setting up work zone markers and signs.

The PHSO will ensure that daily safety meetings involving all persons permitted to enter the contaminated area (Exclusion Zone) are conducted. The PHSO will have the authority to suspend work or modify work practices for safety reasons and to dismiss individuals whose conduct on the Site endangers the health and/or safety of others.

3.4 Project Field Supervisor
The PFS will be: TBD
The PFS is responsible for coordinating and supervising technical field activities at the Site.

This individual(s) will be on-site at all times during the field operations and will document all work progress and be responsible for execution of the PEA Workplan and HASP. This individual is responsible for controlling access to the Site has the authority to prohibit individuals from continuing on-site work due to safety infractions, and can implement use of upgraded personal protective equipment using his judgment. This individual will also maintain a record of all logs and a copy of the HASP at the Site for the duration of the fieldwork.

3.5 Site Health and Safety Officer
The SHSO will be: TBD
The SHSO is responsible for assisting the PM and PHSO with on-site implementation of this HASP. Responsibilities include:

Cudahy Park Renovation Project, Project # PRE-001 Document Control 334 of 1214 Page 364 of 1692 Converse Project No. 24-41-114-02 4
• Maintaining safety equipment and supplies
• Performing air quality measurements as required or needed • Directing decontamination operations and emergency response operations • Setting up work zone markers and signs if such zones are specified in the HASP • Reporting all accidents, incidents, and infractions of safety rules and requirements to the PM, PHSO, and CHSO.

The SHSO has the authority to inspect work at any time. If they determine that the provisions of the HASP are inadequate to provide a working environment conducive to worker safety, then theyare to inform the PM of individuals whose on-site presence jeopardizes their health and safety or the health and safety of others.

4.0 SCOPE OF WORK
This HASP covers the field work and field activities associated with the renovation activities proposed in the Tree Boundary and River Road areas of the Site. The field activities are expected to include, but are not limited to renovation activities, oversight and possible soil matrix sampling. Detailed information is provided in the SMP.

5.0 SITE HAZARD ANALYSIS
Park renovation activities in the Tree Boundary and River Road portions of Cudahy Park may result in exposure to biological, chemical, and physical hazards. Preparation of this HASP was based on review of the SMP.

5.1 CHEMICAL HEALTH HAZARDS
The chemicals of concern (COCs) may form toxicological exposure hazards and enter the body via inhalation, ingestion, skin absorption, and/or injection. The permissible exposure limit (PEL) is defined by the California Department of Occupational Safety and Health (CAL/OSHA) in the California Code of Regulations (CCR), Title 26, Section 5155, and other sections, where necessary. PELs refer to the airborne concentrations of substances and represent conditions during which it is believed that nearly all workers may be repeatedly exposed, eight (8) hours per day, for a 40 year working lifetime, without adverse effect. Variations in individual susceptibility may result in a small number of workers experiencing discomfort to some or all the chemicals at concentrations equal to or below the PEL. A smaller percentage of individuals may be affected more seriously from exposures at or below the PEL due to aggravation of a pre-existing condition or by development of an occupational illness. The PEL is based on research conducted by the National Institute for Occupational Safety and Health (NIOSH) and the American Conference of Governmental Industrial Hygienists (ACGIH) and are based on the best available information from industrial experience, animal studies, and other sources.

The time-weighted average (TWA) PEL represents a time-weighted exposure for an eight (8)- hour workday, 40 hours per week. Most PELs are expressed as time-weighted averages.

CAL/OSHA also has promulgated short-term exposure limits (STEL; usually 15 or 30 minutes) for certain substances. A few substances have ceiling concentration (the highest allowable concentration in the workplace) that cannot be exceeded, even instantaneously. Substances Cudahy Park Renovation Project, Project # PRE-001 Document Control 335 of 1214 Page 365 of 1692 Converse Project No. 24-41-114-02 5
that can enter the body in a gaseous form through the skin are denoted by CAL/OSHA with an “s.”

5.1.1 CHEMICALS OF CONCERN
Investigations conducted at the Site identified lead, benzo(a)pyrene, benzene, toluene and xylenes in soil at the Site as the primary COCs.

The applicable exposure limits for the chemicals listed above are presented in the following text and in Tables. The following is a brief description of the potential hazards associated with these compounds.

EXPOSURE LIMITS
COMPOUND CAS No. TYPE CONC. AGENCY
Lead 7439-92-1 8-hr TWA 0.05 mg/m3 CAL/OSHA
Benzo(a)pyrene* 65966-93-2 8-hr TWA 0.2 mg/m3 CAL/OSHA
Benzene 71-43-2 8-hr TWA
STEL
1 ppm
5 ppm

CAL/OSHA
Toluene 108-88-3
8-hr TWA
STEL
Ceiling
10 ppm
150 ppm
500ppm

CAL/OSHA
Xylenes 1330-20-7
8-hr TWA
STEL
Ceiling
100 ppm
150 ppm
300 ppm

CAL/OSHA
TWA – Time Weighted Average
STEL – Short Term Exposure Limit
*Coal tar pitch volatiles (benzene soluble fraction, anthracene, benzo(a)pyrene, phenanthrene, acridine, chrysene, pyrene) exposure limit values used for benzo(a)pyrene Toxicological profiles for the chemicals of concern were obtained from the Agency for Toxic Substances and Disease Registry (ATSDR). No profile for benzo(a)pyrene was available. The profiles are as follows:

Lead
Lead is a heavy, ductile, soft, gray solid. It is non-combustible with a melting point of 621oF and vapor pressure of 0.0 mm of Hg. Lead is incompatible with strong oxidizers, hydrogen peroxide, and acids. Ingestion or inhalation of lead may result in weakness, insomnia, facial pallor, pal eye, anorexia, malnutrition, abdominal pain, colic, anemia, gingival lead line, tremors, paralysis of wrist/ankles, kidney disease, and hypertension. It is also irritating to the eyes.

Benzene
Benzene is a colorless liquid with a petroleum-like odor. It evaporates into the air very quickly and dissolves in water. It is highly flammable. Inhalation or ingestion of benzene may result in a decrease in the number of red and white blood cells. This can lead to anemia and bone marrow cancers, including acute myelogenous leukemia.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 336 of 1214 Page 366 of 1692 Converse Project No. 24-41-114-02 6
Toluene
Toluene is a clear, colorless liquid with a distinctive smell. Toluene may affect the nervous system. Low to moderate levels can cause headaches, dizziness, tiredness, confusion, weakness, drunken-type actions, memory loss, nausea, and loss of appetite. These symptoms usually disappear when exposure stops.

Xylenes
There are three forms of xylene in which the methyl groups vary on the benzene ring: metaxylene, ortho-xylene, and para-xylene (m-, o-, and p-xylene). These different forms are referred to as isomers. Xylene is a colorless, sweet-smelling liquid that catches on fire easily. High levels of exposure for short or long periods can cause headaches, lack of muscle coordination, dizziness, confusion, and changes in one's sense of balance. Exposure of people to high levels of xylene for short periods can also cause irritation of the skin, eyes, nose, and throat; difficulty in breathing; problems with the lungs; delayed reaction time; memory difficulties; stomach discomfort; and possibly changes in the liver and kidneys. It can cause unconsciousness and even death at very high levels.

5.2 BIOLOGICAL HAZARDS
Potential biological hazards may include plants, ticks, snakes, various stinging insects, and biological health hazards (BHH). Some of the most common biological hazards can be prevented or the effects reduced by over-the-counter medications. These medications, as recommended by local pharmacists, will be kept in supply in the first aid kit. The best protections against biological hazards are to wear appropriate clothing and avoid exposure to the hazard. Workers who know they are sensitized to any biological hazard should not perform any task that would increase their risk for anaphylactic shock. Additionally, the SHSO should be informed of any sensitization to biological hazards.

5.3 PHYSICAL HAZARDS
Listed below are the types of physical hazards that may be present during activities at the Site:
• Slip, Trip, or Fall - These types of hazards result from unleveled surfaces, slippery surfaces, and hard-to-see objects located across walking paths (e.g., rope, cords, etc.), and are responsible for over 60% of work-related injuries. • Housekeeping and Sanitation - In order to permit safe and efficient work conditions, all work areas will be kept clean and free from debris. All hand tools will be kept in storage until they are needed for use. Trash containers will be leak proof, clean, and maintained in a sanitary condition. If vermin are encountered, an approved extermination method will be initiated. Potable water will be used for first aid, drinking, and personal hygiene purposes. All floors will be kept free from standing water. Disposable drinking cups will be provided, along with water coolers. Community drinking cups will not be permitted. • Falling Objects - Hard hats, safety glasses, and steel-toed footwear will be required for personnel in all work areas.
• Traffic Safety - During normal business hours, there may be a significant level of traffic coming to and from the Site Pedestrian traffic on the Site may be at risk as traffic enters and exits the Site.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 337 of 1214 Page 367 of 1692 Converse Project No. 24-41-114-02 7
• Noise - High noise levels (in excess of 85 decibels [db] for extended periods) can result in temporary and permanent loss of hearing. Areas where noise levels exceed 85 db will be posted and hearing protection will be provided and worn. Noise dosimetery will be performed as required by Cal/OSHA specifications.

5.4 REQUIRED SAFETY MEASURES FOR PHYSICAL HAZARDS
Listed below are the types of safety measures to be taken to reduce physical hazards that may be present at the Site:

Potential Hazard Required Safety Measure
Head Injury Hard hats will be worn.

Eye Injury Safety glasses will be worn around moving machinery.

Foot Injury Safety shoes with steel reinforced toes will be worn.

Other Injury Guards are required on all moving parts, belts, and pulleys.

Fire Fire or tobacco smoking will be strictly prohibited within the containment area. Fire extinguishers will be readily available.

Inhalation The vapor and dust concentrations that might be encountered may exceed currently recommended exposure limits. Respiratory protection must be used if 80% of the exposure limits are exceeded. Appropriate protective equipment will be used, as directed by the PFS/SHSO.

Noise Ear plugs will be used whenever loud machinery is in use.

Dermal exposure Contact of sufficient duration to cause significant absorption of toxic components is highly unlikely. Repeated daily or prolonged contact with contaminated soil or water, however may be expected to defeat the skin and perhaps over a long period of time lead to irritation and dermatitis. For this reason, direct skin contact with contaminated soil or water will be avoided by wearing protective gloves. However, if skin contact does occur, the exposed areas will be washed with soap and water and rinsed thoroughly.

Equipment Failure If monitoring instruments or any safety equipment fails, work will be suspended until repairs or replacements can be found. In case of working equipment failure, the PFS/SHSO will ensure that no hazardous conditions prevail before authorizing further work.

Slip, Trip, and Falls Appropriate warning signs will be posted, wherever this danger exists.

Underground Utility Location of all underground utility lines will be determined before commencing work. In case of breach of a line, electricity and gas supply will be shut off.

Traffic Hazards When working in an area open to vehicular traffic, the work area will be clearly delineated to restrict vehicular access. When working in public right-of-ways, lane closures must be conducted in compliance with the guidelines set forth in the State of California Manual of Traffic Controls (Watch handbook) and any additional local ordinances or guidelines. Personnel exposed to vehicular traffic will use high-visibility clothing in accordance with the requirements of 8 CCR 1598(c).

Cudahy Park Renovation Project, Project # PRE-001 Document Control 338 of 1214 Page 368 of 1692 Converse Project No. 24-41-114-02 8

5.5 HEAT STRESS
Heat stress and associated complications can be the most prevalent health concerns on-site, especially when Personal Protective Equipment (PPE) is used. Refer to Section 9 for a description of PPE for this Site. Heat stress problems for workers can occur more often than chemical-related hazards and must therefore be regarded with caution.

If precautions are not taken, workers in PPE may experience varying degrees of heat stress. All workers will be encouraged to drink increased amounts of fluids (which will be readily available at the Site at all times, at an appropriate location). All personnel will monitor each other to determine if any signs of heat stress become apparent. A work/rest regimen will be instituted to reduce heat-related exhaustion.

The PFS/SHSO will be trained to recognize the symptoms of heat rash, heat cramps, heat exhaustion, and heat stroke. Using the following procedures will help reduce the potential for workers to experience symptoms of heat stress:
• Provide plenty of liquids to replace loss of body fluids, including salt water solutions or commercial mixes such as Gatorade (registered product). Commercial mixes may be preferred by individuals on low sodium diets
• The following work/rest regimen will be followed for field workers performing light/moderate work at PPE level C or level B outdoors:

Work/Rest Regimen Temperature
°F °C
Continuous work <79 27
75% work/25% rest each hour 79 27
50% work/50% rest each hour 84 30
25% work/75% rest each hour 88 32
In order to evaluate the adequacy of this work/rest schedule, heart rate (pulse) determination will be made involving each worker leaving the work area and again approximately one (1) minute after exit. If the exit pulse exceeds 0.7 times the difference between 220 and the age of the individual, or if the one (1) minute pulse exceeds 110 beats per minute, then the work schedule will be reduced by 10 minutes and, therefore, the rest period will increase by the same 10 minutes each hour.

6.0 GENERAL HEALTH AND SAFETY REQUIREMENTS
Records documenting the Site safety program will be maintained. This will include information about medical clearance for each individual working at the Site, training, safety briefing, distribution of the HASP, incidents, safety completion report, and posting requirements.

Records will be maintained in a health and safety logbook and appropriate health and safety forms.

Records will be kept consistent with all applicable CAL/OSHA regulations. The following records will be maintained at the offices of each subcontractor:

Cudahy Park Renovation Project, Project # PRE-001 Document Control 339 of 1214 Page 369 of 1692 Converse Project No. 24-41-114-02 9
• Hazard communication training
• Hazardous waste site training
• Respiratory protection training
• Respirator assignment
• Medical surveillance
• Safety inspection reports
• Personal monitoring records
• Accident logs
• CAL/OSHA logs (200 form or equivalent).

The PM or PFS will maintain the following records at the Site:
• Persons on-site, their affiliation, and purpose
• Telephone conversations
• Sampling activities
• Chain-of-custody forms
• Work progress
• Site safety inspection reports
• Tailgate safety meeting forms
• Worker illness and/or injury reports
• PEA Workplan (and changes)
• HASP (and changes)
• Daily work activities and conditions
• Accident log.

Subcontractors will maintain employee records in a manner consistent with the applicable regulations.

6.1 MEDICAL CLEARANCE AND MONITORING
All personnel must obtain health and safety clearances before beginning work at the Site.

Employees will be active participants in the Consultant’s Medical Surveillance Program. Project personnel who may be required to wear respirators must provide evidence that they have been cleared by a physician to wear respirators. All field personnel are to be an active participant in the Consultant’s Respiratory Protection Program.

6.2 SAFETY ORIENTATION MEETING
All field personnel must attend a safety orientation meeting before commencing fieldwork. The meeting will be scheduled and conducted by the PM, PFS, or SHSO. The dates of briefing sessions and attendees must be recorded on the Safety Meeting Form (Figure1 at end of HASP). Safety orientation/ training meetings must be convened:
• Before field work begins
• When there are modifications to the HASP that are applicable to field personnel • When additional personnel begin fieldwork.

Respirator fit testing should be conducted at the safety meeting for all individuals who have not been test fitted and who may be required to wear respirators. The meeting will include Cudahy Park Renovation Project, Project # PRE-001 Document Control 340 of 1214 Page 370 of 1692 Converse Project No. 24-41-114-02 10
presentation of the HASP. The NIOSH report regarding confined spaces will be presented at the initial safety meeting if deemed appropriate by the PFS/SHSO.

6.3 TRAINING
Participation in field activities will not occur until all participants have been trained to the level required by their job function and responsibility. The specific types of training required include orientation for new employees, basic training for first time hazardous waste workers, supervisor training, advanced training, Site-specific training, first aid, and refresher training.

Personnel on this project are required to have completed 40 hours of training. This will include personnel involved with investigations and activities where contaminated soils may likely be encountered. Personnel for each task will be evaluated on-site by the SHSO, as per Hazardous Waste Operations and Emergency Response Standard (HAZWOPER) training.

6.4 DISTRIBUTION OF THE HASP
A copy of this HASP must be available to each employee and subcontractor. The Consultant’s employees and subcontractors must acknowledge reviewing of the HASP and agree to comply with its provisions in writing by signing the Acknowledgement Statement (on Figure 1).

6.5 INCIDENT REPORTING
Injuries, exposure, illnesses, safety infractions, and other incidences must be reported to the SHSO within 24 hours of occurrence.

An incident is any event listed below:
• Illness resulting from chemical exposure or unknown causes • Physical injury, including those that do not require medical attention • Fire, explosions, and flashes resulting from activities performed by the Consultant’s personnel and their subcontractors
• Site damage
• Vehicular accidents occurring on-site or while traveling to and from the Site(s) • Infractions of safety rules and requirements
• Unexpected chemical exposure (indicated by irritation of eyes, nose, throat, or skin).

Accidents on-site where the Consultant is not retaining the subcontractor or individual will be reported, if injury or illness relates to the Consultant’s task. Serious or fatal on-site injuries will be reported as soon as possible to the CHSO.

6.7 POSTING REQUIREMENTS
The following information will be posted or readily available on-site:
• Emergency phone numbers
• Directions to the nearest hospital
• HASP
Cudahy Park Renovation Project, Project # PRE-001 Document Control 341 of 1214 Page 371 of 1692 Converse Project No. 24-41-114-02 11

6.8 AUDITING
The success of the Consultant’s Health and Safety Program will be evaluated through statistical reporting (such as the OSHA 200 logs and insurance experience) and formal audits. Audits will be conducted by the CHSO. Audits may be announced or unannounced, and a formal health and safety audit report will be provided to the PM. Following completion of the field audit, a verbal review of concerns will be completed with the PM and SHSO. Inspections will be made to identify and evaluate hazards when:
• The program is first established
• New substances, processes, procedures, or equipment are introduced to the workplace that represent a new occupational safety and health hazard • Whenever the Consultant is made aware of a new or previously unrecognized hazard.

6.9 INJURY AND ILLNESS PREVENTION PROGRAM
This entire document, including the appendices, serves as an Injury and Illness Prevention Program (IIPP). The persons with authority and responsibility for implementing the program are identified in Section 3.0.

The system for ensuring that employees comply with safe and healthy work practices includes:
• Generation of a HASP
• Auditing by the CHSO
• Daily field health and safety oversight by the SHSO
• Daily tailgate safety review meetings
• Review of employee and subcontractor training.

Employees and subcontractors who are not prepared to abide by the health and safety provisions contained within this document will not be allowed on-site. Individuals observed violating requirements of this document will be given a formal “Notice of Violation.” Should violations continue, or not be corrected, the individual(s) will be removed from the Site(s).

The tailgate safety meetings, training sessions, and postings at the Site are the three (3) major sources of communication between employees. The Consultant’s internal communication system includes:
• A reporting matrix between the SHSO and CHSO
• The communications associated with the auditing program.

The auditing program also complies with Title 8, CCR Section 3203(a)(4), which states that an employer must:
“Include procedures for identifying and evaluating work place hazards including scheduled periodic inspections to identify unsafe conditions and work practices.”
The Consultant’s incident/accident reporting system is the procedure for investigating injury or occupational illness, in addition to its medical surveillance program. This document addresses the applicable sections of the Title 8 CCR, Sections 1509 (Construction) and 3203 (General) regarding the IIPP. Additional information regarding the internal programs of the Consultant, Cudahy Park Renovation Project, Project # PRE-001 Document Control 342 of 1214 Page 372 of 1692 Converse Project No. 24-41-114-02 12
which are not specific, are discussed in the Consultant’s Health and Safety Manual (HSM). The HSM will be posted on-site.

6.10 FIT FOR DUTY
While the Consultant does not seek to interfere with the off-duty and personal conduct of its employees, subcontractors, clients, or visitors, certain types of off-duty conduct may interfere with the legitimate business interests of the Consultant at the Site. It is the responsibility of the Consultant’s employees, subcontractors, clients, or visitors to ensure that they are fit to perform their required duties at the Site. The SHSO has the responsibility to ensure that each individual signing the tailgate meeting is fit for duty. Activities that may affect the fitness of individuals at the Site include:
• Consumption of alcohol
• Use of illegal or controlled substances
• Certain prescription or over-the-counter medicines
• Altered mental state
• Personal injury
• Fatigue.

Any individual found to be unfit for duty will be prevented from entering/working at the Site until it is determined they are fit to return to duty. The SHSO will make an incident report and inform the PM of the incident. Subcontractors who have personnel unfit for duty will be notified and provided with the opportunity to replace the impaired individuals at the Site.

7.0 EXPOSURE MONITORING PLAN
Air monitoring may be used to identify and quantify levels of hazardous substances that could be present at the Site. This may be accomplished by the use of personal monitoring instruments and direct reading instruments for personal and Site monitoring, respectively.

A wind direction indicator may be utilized to ensure the direction that personnel will move when instructed to do so or in any emergency. Air monitoring equipment will be used to measure airborne levels of organic vapors during sampling activities. Monitoring may be done using a photo-ionization detector (PID) or equivalent, for organic vapors. The PID will be calibrated prior to each day’s activities. The calibration will be recorded in a logbook and the instrument will be re-calibrated during the day at the discretion of the PFS/SHSO. Background readings will be obtained at an upwind location.

Work will be started with all personnel using Level D personal protective clothing. For areas where volatile chemicals hazards are suspected, the first person entering the work zone will carry the PID and monitor concentration levels of vapors in the work area before anyone else is allowed into the work zone. The breathing zone will be monitored continuously.

In the event Level B protective equipment is used, one (1) person working in the Exclusion Zone (EZ) will be fitted with a personal sampling pump (dosimeter). This system will remain in the EZ for eight (8) hours continuously, passing from person to person. At the end of the eight (8) hour period, the cartridge and filter will be removed and sent to a State-certified laboratory for analysis. Hence, the average exposure of personnel working in the EZ will be known and can Cudahy Park Renovation Project, Project # PRE-001 Document Control 343 of 1214 Page 373 of 1692 Converse Project No. 24-41-114-02 13
be compared to the TWA. This will act as a confirmation of the conclusions drawn by use of the PID.

Air monitoring equipment such as aerosol monitors (personal data rams) may also be used to measure airborne levels of dust during field activities. Aerosol monitors shall be checked daily to confirmed that they properly calibrated and in good working condition. Real-time information regarding dust levels will be posted daily and discussed with Site workers. Air monitoring samples will be collected over an eight (8) to 10-hour period each day that Site renovation excavation and/or loading activities are conducted. The air-monitoring professional will check the monitoring equipment every 15 minutes during operation.

In addition to the real-time dust monitoring, air samples may also be collected for the potential analysis of COCs. Pumps will be used to draw air through a mixed-cellulose ester (MCE) filter contained within a closed-face polysterene cassette using over an eight (8) to 10-hour period each day. The cassette samples will initially be archived. However, should the RA contractor determine that the Site Action Level for total dust was exceeded during the course of the RA (see Chart below), the cassette samples may be submitted to a laboratory analyzed for lead and arsenic concentrations.

Dust levels, and potentially airborne concentrations of the COCs, shall be monitored at the following general locations:
• Upwind (offsite property if possible).
• Proximate to the exclusion zone adjacent to and downwind of the equipment operator. • One Fenceline location.
• One Downwind location.
• As deemed necessary to determine employee exposure (to be determined by the contractor).

Site safety procedures for total dust and lead, including dust control measures, will be based on the Action Levels specific in the chart below:

Based on the relatively low reported concentrations of benzo(a)pyrene, benzene, toluene, and xylenes in site soils, the total dust action levels in the table below are deemed sufficient to use in place of chemical-specific action levels.

Exposure Guidelines for Site Chemical Hazards
Chemical Name Odor
Threshold
Cal/OSHA
PEL a ACGIH TLV b Site ActionLevels c
Community Action
Level (Fenceline) d
total dust NA 10 mg/m3 10 mg/m3 1.0 mg/m3 0.05 mg/m3
lead NA 0.05 mg/m3 0.05 mg/m3 0.005 mg/m3 0.0015 mg/m3
PEL Permissible Exposure Limit
TLV Threshold Limit Value
ACGIH American Conference of Governmental Industrial Hygienists ppm parts per million
mg/m3 milligrams per cubic meter
a PELs per Cal/OSHA Article 107, Table AC1.
b TLVs for Chemical Substances and Physical Agents and Biological Exposure Indices (ACGIH,1990-1991). c Site Action Level is calculated as 10 percent of TLV or PEL (as measured by NIOSH methods), whichever is smaller. If a Site Action Level is equaled or exceeded, then additional dust mitigation measures will be Cudahy Park Renovation Project, Project # PRE-001 Document Control 344 of 1214 Page 374 of 1692 Converse Project No. 24-41-114-02 14
implemented. If the Site air contaminants cannot be controlled reliably within 15 minutes, then all work will cease and a Certified Industrial Hygienist will be consulted. If Site Action Levels are exceeded on the integrated air monitors, then a Certified Industrial Hygienist will be immediately consulted.

Site Action Level for total (unknown) VOCs is 10 ppm as measured by real-time PID. d Community Action Level for total dust/particulate is based on SCAQMD regulations.

Community Action Level for a specific chemical dust is normally based on the available ATSDR MRL Equivalent Air Concentrations.

Community Action Level for lead is 0.0015 µg/m3 based on the National Ambient Air Quality Standard.

Community Action Level for lead dust is determined based on review of available data regarding soil lead concentrations and will be protective of Site workers and surrounding area inhabitants. Site dust levels will be measured using real-time aerosol monitors.

8.0 SITE CONTROL
The purpose of Site control is to minimize potential contamination of workers, protect the public from the Sites hazards, and prevent vandalism. In order to control activities and movement of personnel and equipment at the Site, a Site control program will be set up. The basic components of a Site control program include establishing work zones, a buddy system, Site security, safe work practices, sanitation, Site communication, and visitor clearances into the work area(s). These components are described below.

8.1 SITE WORK ZONES
Access to hazardous and potentially hazardous areas must be controlled to reduce the probability of physical injury to field personnel, visitors, and the public. A hazardous or potentially hazardous area includes any area where field personnel are required to wear PPE.

The establishment of work zones will help ensure that: personnel are properly protected against hazards present where they are working, work activities and contamination are confined to appropriate areas, and personnel are located and evacuated in an emergency. Three (3) work zones will be established around any intrusive activity: the EZ, the contaminant reduction zone (CRZ), and the support zone (SZ). The area work zones will be clearly identified, as appropriate, with barrier tape or other demarcation methods.

A restricted zone will be maintained to a distance of 15 feet from the work activity area.

Protective clothing and equipment, as described below, are to be worn by all personnel working within the restricted zone.

The precise locations of all work areas, the decontamination area, equipment storage areas, rest areas, restroom facilities, and routes of exit will be established in the field. The support zone will be upwind from the work zone, when possible. All persons entering the subject Site will identify themselves to the PM, PFS, or SHSO for proper documentation.

8.1.1 Exclusion Zone
The EZ is defined as the area where contamination is either known or likely to be present, or where activities will create the potential to cause harm to personnel. The EZ initially will be established for each specific task based on the presence of contaminants within the area, and subsequently may be altered by the SHSO based on new data or observations. The outer boundary of the EZ, known as the Hotline, will be clearly delineated with barrier tape and/or traffic barriers. Warning signs will be placed around the perimeter of the EZ warning of a hazardous work zone. Access Control Point(s) (ACPs) will be established at the periphery of the EZ to regulate the flow of personnel and equipment into and out of the EZ, and to verify that relevant procedures for entry and exit are followed. Access will be restricted to personnel with Cudahy Park Renovation Project, Project # PRE-001 Document Control 345 of 1214 Page 375 of 1692 Converse Project No. 24-41-114-02 15
appropriate training and documentation, and wearing appropriate PPE, as defined in this HASP.

Eating, drinking, and smoking are prohibited within the EZ.

8.1.2 Contaminant Reduction Zone
The CRZ is the area where personnel conduct personal and equipment decontamination. Its location will be established based on air monitoring results, and it will be surrounded by barrier tags, traffic cones, and/or warning signs. It is a transition area between contaminated areas and clean areas, and provides an area to prevent or reduce the transfer of contaminants that may be present on personnel or equipment returning from the EZ. No disposable outer protective work clothing will leave the CRZ. Emergency and first aid equipment, equipment resupply (gloves, etc.), and temporary rest facilities (chairs, shade, liquids, etc.) will be available in the CRZ.

Access into and out of the CRZ from the EZ is controlled through ACPs. The boundary between the CRZ and the SZ, the Contamination Control Line, separates the low contamination area from the clean SZ. Entry into the CRZ from the SZ will be controlled through ACPs. Activities to be conducted in the CRZ will require PPE as defined in the decontamination procedures. Exit from the CRZ requires the removal of any suspected or known contaminated PPE and compliance with decontamination procedures. A primary and secondary CRZ will be established. Exit through the secondary CRZ will occur only during emergencies.

8.1.3 Support Zone
The SZ is a clean area where the chance of encountering hazardous materials or conditions is minimal. It contains administrative and other support functions, including the Command Post (CP). CP personnel are responsible for supervision of all field operations and field teams. CP personnel are also responsible for maintaining internal and external communication and alerting the proper authorities in the event of an emergency. Telephone communication will be maintained by the use of cellular phones at the Site. Emergency telephone numbers and hospital route maps will be kept here. Health and safety records and up-to-date copies of the HASP will be kept in the SZ. Break/conference, lunch, storage/supply, security, sanitation, and emergency medical facilities will be established in this area. Personnel may wear normal street clothes within this area. Eating, drinking, and smoking are permitted in this area.

8.2 SPILL CONTROL
Absorbent material for spill containment will be kept on-site, especially during any groundwater sampling. The absorbent material will also be present in the CRZ to contain any spills from the decontamination process.

8.3 BUDDY SYSTEM
The “Buddy System” will be used on-site to:
• Work inside the EZ
• Warn partners of an impending hazard
• Periodically check the integrity of partner’s PPE
• Provide aid in the case of injury, and notify the appropriate personnel of accidents.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 346 of 1214 Page 376 of 1692 Converse Project No. 24-41-114-02 16
Prior to working in the field, “buddies” will establish a time to communicate if either one is out of sight from the other person for an extended period. A way to communicate should also be agreed on prior to entry into the work area.

8.4 SITE SECURITY
Site security is necessary to:
• Prevent the exposure of unauthorized, unprotected people to Site hazards; • Prevent theft; and
• Avoid interference with safe working procedures.
• Personnel and vehicle entry will be restricted in established work zones. The responsibilities of personnel include:
• Limiting access to authorized personnel only. Requiring identification of all personnel requesting access to the work zones (i.e., SZ, CRZ, or EZ); • Ensuring that all visitors to the Site who will not be involved in specific work operations have a valid purpose for entering the Site and approval for access from the SHSO. The SHSO will ensure that visitors entering work zones have the appropriate training, and have read and signed the HASP;
• Requiring all personnel accessing the work zones to sign in and out; • Excluding unauthorized personnel from the Site. Advising unauthorized personnel attempting to gain access to the Site that they are trespassing and will be prosecuted for unauthorized entrance to the Site. Security personnel will make all reasonable efforts to record a description of the trespasser and their vehicle; • In the event of a fire, explosion, release of airborne contaminants, flood, or other emergency that requires the evacuation of personnel, security personnel will limit Site access to only those personnel authorized by the Site emergency response coordinator.

The SHSO will initiate a head count, review the sign-in log, and determine which personnel, if any, are not accounted for; and
• Keeping a daily security log including entry/exits log, vehicle log, results of security checks, and details of any security problems.

8.5 SAFE WORK PRACTICES
To maintain strong safety awareness and enforce safe procedures, the following personnel requirements and prohibitions will be established for the Site:
• The subject work area will be restricted to authorized visitors and personnel. These individuals will be required to attend a tailgate safety meeting upon entering the subject area during which they will be informed of the various work zones and facilities, the health and safety hazards associated with their assigned work activities, control measures, the care and use of personal protective equipment, emergency action plans, and other pertinent information. Tailgate safety meetings will be conducted on a daily basis at the beginning of each shift. Attendance rosters will be recorded and maintained by the PFS;
• All persons entering the Site will be required to identify themselves to the PFS. Persons who have not attended a tailgate safety meeting on that day will be required to do so with the SHSO or other authorized representative. Persons unfamiliar with the Site will Cudahy Park Renovation Project, Project # PRE-001 Document Control 347 of 1214 Page 377 of 1692 Converse Project No. 24-41-114-02 17
be informed of Site hazards and instructed to avoid contact with contaminated surfaces, soils, sample materials, or related equipment, and will be instructed to remain upwind from all active work areas. Eating, drinking, chewing gum or tobacco, smoking or any practice that increases the probability of hand-to-mouth transfer and ingestion of material is prohibited in the EZ and CRZ. Drinking water or equivalent fluids may occur in the CRZ at the discretion of the SHSO. Before wearing Level C PPE, personnel may drink fluids in the CRZ. They will also complete the decontamination procedures necessary to exit the EZ, remove their respiratory protection, remove all protective gloves, and wipe their hands and face with pre-moistened towelettes;
• Any skin contact with contaminated or potentially contaminated surfaces, samples, or equipment will be avoided;
• Site personnel will use the “Buddy System” when performing duties in the EZ and CRZ work zones. Communications between members will be maintained at all times. Visual contact will be maintained between buddy pairs at all times; • As appropriate, equipment will be bonded and grounded, and will be spark resistant; • A fire extinguisher will be available for use in the subject area during all working hours. If the travel distance to the extinguisher from any point in the area where work is in progress is greater than 50 feet (15.3 meters), then additional fire extinguishers will be furnished and strategically located so that the travel distance does not exceed 50 feet (15.3 meters);
• A portable emergency eyewash station will be located strategically in the work area. The eye wash station will be capable of flushing the eyes with copious amounts of water; • Upon leaving the CRZ, all persons will adhere to the decontamination procedures outlined in this HASP;
• Removal of materials from protective clothing or equipment by blowing, shaking, or any other means which may disperse contaminated materials into the air is prohibited; • Legible precautionary labels will be affixed to containers of raw materials, intermediate products, mixtures, waste debris, and contaminated PPE; • Contaminated PPE will not be removed from the Site until it has been cleaned or properly packaged or labeled;
• Hands will be thoroughly washed upon leaving contaminated or suspected contaminated areas before eating, drinking, or other such activity;
• All hazardous wastes, soil samples, and other contaminated materials which are removed from the subject Site will be accompanied by appropriate shipping papers; • A first-aid kit suitable for use at hazardous waste sites will be located in the SZ at each contamination reduction corridor;
• No running or horseplay;
• The required level of PPE must be worn by all on-site personnel; • No facial hair that interferes with a satisfactory fit of the mask-to-face seal is allowed on personnel required to wear respiratory protection;
• Medicine and alcohol can worsen the effects from exposure to toxic chemicals.

Prescribed drugs will not be taken by personnel on operations where the potential for absorption, inhalation, or ingestion of toxic substances exists, unless specifically approved by a qualified physician. Alcoholic beverage intake will not be allowed during breaks;
• Safety devices on equipment must be left intact and used as designed; and Cudahy Park Renovation Project, Project # PRE-001 Document Control 348 of 1214 Page 378 of 1692 Converse Project No. 24-41-114-02 18
• Equipment and tools will be kept clean and in good repair, and used only for their intended purpose.

8.6 STANDARD OPERATING PROCEDURES
Employees and subcontractors are expected to follow the standard operating procedures listed below while involved in work at the Site:
• Buddy System: A minimum of two (2) workers will be on the Site at all times during all operations. The buddy pair(s) will maintain visual or voice contact at all times. In addition, a minimum of one (1) person will remain in the SZ, at all times; • PPE: All persons entering the EZ will do so while wearing the PPE equipment documented in this HASP. Such individuals will be trained in the proper use, care and maintenance of this equipment, will have submitted to a physical examination by a licensed medical physician, and will have been deemed physically fit to wear such equipment. The user will inspect such equipment before donning. Donned gloves and boots will be taped to protective clothing to provide closure; • Emission control: Wet methods will be used to control emissions of volatile hydrocarbon or other gases and vapors, liquids, or particulate materials; and • Observance of Unanticipated Hazardous Materials: In the event, unanticipated hazardous material(s) are observed or symptoms of distress are experienced by workers, the SHSO will conduct an investigation. He/she may collect samples in order to ascertain the identity of the material(s).
• Symptoms of Distress: The SSO and each subcontractor field supervisor will periodically observe personnel for symptoms of distress. Indications of such adverse effects include:
-Changes in complexion, skin discoloration
-Signs of in-coordination
-Changes in demeanor, disposition
-Excessive salivation, papillary response
-Changes in speech patterns
-Nervousness or excitability
Field personnel are required to contact their field supervisor upon experiencing ill effects such as:
• Headache or dizziness
• Blurred vision
• Irritation to the eyes, mucous membranes, respiratory tract or skin • Heat stress
• Daily Shutdown: All mechanical equipment will be parked and/or stored in a safe location designated by the PM, PFS, or SHSO.
• Stop Work Orders: In the event work is performed contrary to the provisions of the specifications and/or approved work plans, or contrary to the conditions of any applicable permit or certificate, or if upon inspection, it is determined that continuation of authorized work is likely to endanger any person or public and/or private Site, then the work will be stopped by notice in writing served by the PM or any other authorized representative.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 349 of 1214 Page 379 of 1692 Converse Project No. 24-41-114-02 19

8.7 SANITATION
An adequate supply of potable water will be provided. Potable drinking water containers will be capable of being tightly closed and be equipped with a tap. The “common” drinking cup is prohibited. Adequate washing facilities for employees engaged in operations at the Site will be provided. The facilities will be in proximity to the work site and will be equipped to handle both sexes.

8.8 SITE COMMUNICATION
Successful communication between field teams and SZ personnel is essential. An internal communication system among on-site personnel and an external communication system between on-site and off-site personnel will be established.

8.8.1 Internal Communication System
The internal communication system will be used to relay health and safety information, communicate changes in work, maintain Site control, and alert personnel in case of emergencies. Verbal communications will be the primary method of routine communication.

8.8.2 External Communication System
The external communication system between on-site and off-site personnel is necessary to report to management, maintain contact with essential off-site personnel, and coordinate emergency response. Cellular telephones maintained in the SZ will be the primary means of external communication, and will be used to notify off-site emergency response agencies if incidents and to request assistance.

8.9 VISITOR CLEARANCES
Entry to hazardous areas will be limited to individuals who must work in those areas. Unofficial visitors must not be permitted to enter hazardous areas while work in those areas is in progress.

Official visitors should be discouraged from entering work areas, but may be allowed to enter only if they agree to abide by the provisions of this document, follow orders issued by the SSO, and sign a compliance agreement that they were informed of the potential dangers that could be encountered in the areas.

9.0 PERSONNEL PROTECTIVE EQUIPMENT
The purpose of PPE is to isolate or protect personnel from the chemical and physical hazards that may be encountered at the work site. A Site-specific PPE program has been developed.

The various components of this program are levels of protection, respirator care, PPE inspection, and levels of protection per task.

PPE and safety precautions will be appropriate to protect against the known and potential health hazards in the subject area. The protective equipment required has been selected based on the contaminant type, anticipated concentrations in the air, and known routes of entry into the body.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 350 of 1214 Page 380 of 1692 Converse Project No. 24-41-114-02 20

9.1 LEVELS OF PROTECTION
The levels of protection (LOP) required for the investigation of the source of communication will be continually evaluated as fieldwork progresses. It should be noted that there may be increases or decreases in the LOP. The following levels of protection have been defined based on a review of work site histories and tasks to be performed.

9.1.1 Level D
United States Environmental Protection Agency (USEPA) Level D personnel protective equipment for all personnel entering the work area, unless the SHSO decides to upgrade the level of protective equipment to be used. Level D consists of the following:
• Work clothes
• Construction quality boots with steel toe and shank
• Inner polyvinyl chloride surgical or latex gloves
• Hard hats
• Safety glasses and hearing protection.

At a minimum, the following PPE will be discarded and replaced daily:
• Inner polyvinyl chloride surgical or latex gloves
• Outer gloves
New outer gloves should be used for each sample.

9.1.2 Modified Level D
Modified Level D personnel protective equipment may be required by the SHSO if monitoring data or the tasks to be performed suggests that personnel entering the work area need additional protection. Modified Level D consists of the following:
• Uncoated Tyvek
• During intrusive activities, Tyvek sleeves will be worn over the cuff of protective gloves and Tyvek legs will be worn over the upper portion of disposable boot covers. Tape will be used to seal the joints between Tyvek, protective gloves, and boot covers
• Protective disposable gloves (inner latex, outer nitrile or butyl) • Chemical-resistant outer gloves
• Boots (PVC, neoprene or other chemically resistive material) with steel toe and shank
• Splash-resistant goggles will be worn if splashing may occur • Hard hats.

9.1.3 Level C
Level C consists of Modified Level D gear plus:

Cudahy Park Renovation Project, Project # PRE-001 Document Control 351 of 1214 Page 381 of 1692 Converse Project No. 24-41-114-02 21
• Full- or half-face respirators and NIOSH/OSHA approved cartridges sealed in a plastic bag and ready for immediate donning. The cartridges to be used will be HEPA organic vapor cartridges with dust mist pre-filter.

9.1.4 Level B
Level B is used when a high level of respiratory protection is required. This involves atmospheres with Immediately Dangerous to Life or Health (IDLH) concentrations of specific substances that do not represent a skin hazard or atmospheres containing less than 19.5% oxygen. Level B gear consists of the following:
• Pressure-demand, full-face, self-contained breathing apparatus (SCBA) or pressure-demand supplied-air respirator with escape SCBA • Chemically-resistant Tyvek suits (wet soil)
• Uncoated Tyvek suits (dry soil)
• Chemically-resistant inner and outer gloves
• Chemically-resistant steel-toed rubber boots
• Hard hat
• Hearing protection
• Two-way radio communications.

Level B personal protective equipment will not be available on-site. Should the SHSO determine that Level B protection is required; the CHSO will be contacted to make arrangements for a Certified Industrial Hygienist to evaluate the health and safety requirements at the Site and prepare a more detailed HASP.

9.2 RESPIRATOR CARE
Each individual is responsible for inspecting and maintaining his or her own respirator. Before being taken into the field, all respirators will be inspected, cartridges (if used) installed, a positive and negative pressure check conducted, and the entire respirator assembly will be sealed in a plastic bag. After the respirator is used, the following cleaning procedures will be used:
• Cartridges for air-purifying respirators will be removed and disposed of as contaminated PPE
• The respirator face piece interior and exterior will be wiped down with premoistened towelettes, such as baby wipes, and subsequently sealed in a plastic bag for transport to the respirator cleaning station at the personal decontamination facility
• After a respirator has been cleaned and rinsed, it will be patted dry and a clean towel and stored.

9.3 PPE INSPECTION
PPE inspection will be done before use, during use, and after use. The following will be inspected during the course of the work activities at the Site.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 352 of 1214 Page 382 of 1692 Converse Project No. 24-41-114-02 22

9.3.1 Clothing
Before use:
• Determine that the LOP is correct for the specific task at hand by consulting with the SSO.
• Visually inspect for:
- Imperfect seams
- Tears
- Malfunctioning closures
During use look for:
• Evidence of chemical attack, such as discoloration, swelling, stiffening, and softening.

However, chemical penetration can occur without any visible effects • Closure failure
• Tears
• Punctures
• Seam discoloration.

9.3.2 Gloves
Before use, pressurize glove to check for pinholes. Blow into glove and make sure no air escapes.

9.3.3 Respirator
Before use:
• Make sure that respirators have been adequately cleaned • Check material condition for signs of deterioration and distortion • Examine cartridges or canisters for expiration dates and ensure that they are the proper type for intended use. Also, make sure that the canisters or cartridges have not been previously used.

After use, make sure that respirators have been adequately cleaned.

9.4 LEVEL OF PPE PROTECTION
The work being performed will be conducted in Level D or modified Level D. Levels of protection will be upgraded in accordance with action levels provided in Table 2: Response Level and Action. PPE ensembles have been selected to ensure a level of protection greater than the minimum required to protect employees from anticipated hazards. The HASP will further assess the workplace hazards and ensure that the proper PPE ensemble is provided and worn during work activities.

9.5 EQUIPMENT REQUIRED TO BE AVAILABLE ON-SITE
Items required on-site include:
• First-aid kit with eye wash
Cudahy Park Renovation Project, Project # PRE-001 Document Control 353 of 1214 Page 383 of 1692 Converse Project No. 24-41-114-02 23
• Fire extinguisher
• Construction tape and barriers to delineate work zone • Decontamination equipment
• NO SMOKING signs
• A vehicle must be kept on-site when personnel are working for the transport of slightly injured personnel to the hospital (severely injured personnel MUST be transported by paramedics).

10.0 DECONTAMINATION METHODS
Decontamination procedures will be implemented to protect personnel from hazardous substances that may contaminate and/or eventually permeate protective clothing, respiratory protective equipment, tools, vehicles, and other equipment used on-site; to protect all Site personnel by minimizing the transfer of harmful materials into clean areas; to prevent mixing of incompatible chemicals; and to protect the community by preventing uncontrolled transportation of contaminants from the Site. Personnel exiting the EZ will pass through the CRZ, where protective gear will be cleaned and/or discarded. There will be one (1) CRZ per EZ. The particular location of the CRZ will be determined during the initiation of Site activities.

10.1 PERSONNEL DECONTAMINATION
Personnel decontamination facilities will be supplied with a potable water supply. All personnel leaving the EZ must exit through the CRZ and perform appropriate decontamination procedures to prevent the transfer of contaminated materials into clean areas. The types of contaminants that they may have contacted and their function in the CRZ should determine the extent of their decontamination.

The decontamination process consists of a series of procedures performed in a specific sequence, depending on the level of PPE worn and Site contaminants present. Before the start of work activities, the number and layout of decontamination stations will be determined. To prevent cross-contamination, each procedure will be performed at a separate station, and stations will be arranged in order of decreasing contamination. In the event that Level C or B equipment is used, the following procedures will be instituted for decontamination all articles leaving the EZ and CRZ to prevent or reduce the physical transfer of contaminants by people and/or equipment from the subject area.

PERSONNEL EXITING EZ:
• If the worker is heavily contaminated, water will be used to remove contamination prior to entering the CRZ. Water will be contained in a bucket or tub • Deposit used equipment in the EZ or on tables in the CRZ for subsequent decontamination
• Scrub outer boot covers or polyvinyl chloride (PVC) overboots and outer gloves with decontamination solution or detergent and water
• If gross contamination is evident, remove contamination, to the extent practicable, from disposable suit and/or tank using disposable wipes or towels, with assistance from CRZ technician
• Remove tape around boots and gloves. Remove outer boot covers or PVC over boots and outer gloves. Discard tape, boot covers, and outer gloves in appropriate container Cudahy Park Renovation Project, Project # PRE-001 Document Control 354 of 1214 Page 384 of 1692 Converse Project No. 24-41-114-02 24
• Remove inner gloves and discard in appropriate container • Thoroughly wash hands and face
• All PPE, including respirator, protective clothing and boots, will be removed and placed in appropriately marked containers, for disposal or for decontamination (boots and respirator minus cartridges) as the individual steps from the CRZ to the SZ • Used boots, respirators, and other reusable personal protective equipment will be dismantled (if possible), decontaminated with mild detergent and warm tap water, and rinsed with clean tap water in the CRZ
• The spent solutions, brushes, and the like will, until shown otherwise, be considered contaminated and so treated
• Workers/visitors will be required to wash thoroughly with soap and water prior to leaving the Site and will be instructed to remove work clothes and shower as soon as possible thereafter.

10.2 EQUIPMENT DECONTAMINATION
Vehicles and equipment will be decontaminated before exiting the EZ. People and/or equipment from the subject area will institute the following procedures for decontaminating all vehicles and equipment leaving the EZ and CRZ to prevent or reduce the physical transfer of contaminants:
• An equipment decontamination pad or area will be designated for cleaning large equipment utilized during work activities
• All sampling devices will be decontaminated by scrubbing or wiping a decontamination solution and water on the device
• Tools that are difficult to decontaminate will be kept in the EZ and handled only by workers using the appropriate PPE
• Respirators will be decontaminated and sanitized before being reused • Following decontamination of equipment using steam cleaning, a final steam/water rinse will be applied
• The spent solutions, brushes, and the like will, until shown otherwise, be considered contaminated and so treated
• Wash materials will be disposed of properly
• All porous equipment, which is believed to be contaminated, will be disposed of as hazardous waste.

10.3 EMERGENCY DECONTAMINATION
During emergency situations, decontamination will be performed to the maximum extent possible without compromising medical attention to the victim. If decontamination may aggravate or cause more serious health effects, or if injuries are life threatening, prompt life saving, first aid and medical treatment should be administered without decontamination or concurrently with it. Outer garments can be removed (depending on the weather) if it does not delay or interfere with medical treatment, or aggravate the problem. Respirators and backpack assemblies must always be removed. If outer garments cannot be safely removed, the victim should be wrapped in plastic, rubber, or blankets to minimize contamination of emergency transport vehicles and medical personnel. Whenever possible, Site personnel should accompany the contaminated victim to the medical facility to advise of matters involving decontamination.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 355 of 1214 Page 385 of 1692 Converse Project No. 24-41-114-02 25

10.4 EQUIPMENT FOR DECONTAMINATION OF PERSONNEL, PPE, AND HEAVY

EQUIPMENT
The following is a list of equipment needed to conduct proper decontamination of personnel, PPE, and equipment:
• Drop cloths of plastic or other suitable materials on which heavily contaminated equipment and other protective clothing may be deposited • Collection containers, such as drums or suitably lined trash cans for storing disposable clothing and heavily contaminated personal protective clothing or equipment that must be discarded
• Lined box with absorbents for wiping or rinsing off gross contamination and liquid contaminants
• Galvanized tubs, stock tanks, or children’s wading pools to hold wash and rinse solution.

The tubs should be large enough for a worker to place a booted foot inside • Appropriate wash solutions to wash off and reduce hazards associated with the contaminants
• Long-handled, soft-bristled brushes to scrub contaminants off PPE and for general exterior cleaning of heavy equipment
• Paper or cloth towels for drying protective clothing and equipment • Metal or plastic drums for contaminated wash and rinse solutions • Plastic sheeting, sealed pads with drains, or other appropriate methods for containing and collecting contaminated wash and rinse solutions
• Soap or wash solutions, washcloths, and towels for personnel.

11.0 EMERGENCY RESPONSE PROCEDURES
This Emergency Response/Contingency Plan (ERP) has been developed to include instruction and procedures for personnel evacuation and procedures for medical emergencies that may occur during the project. All personnel emergency conditions require actions conducted in a manner that minimizes health and safety risks. All on-site personnel must be familiar with the ERP. Additions to the ERP will be incorporated into this HASP by addendum. All aspects of the plan will be addressed as part of the Site-specific health and safety training required for all personnel.

11.1 RESPONSIBILITIES

11.1.1 Corporate Health and Safety Officer
The CHSO, or designee, will oversee the development and approval of the ERP and perform audits to ensure that the ERP is in effect and that all pre-emergency requirements are met. The CHSO will act as a liaison to applicable regulatory agencies and notify OSHA of reportable accidents or fatalities.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 356 of 1214 Page 386 of 1692 Converse Project No. 24-41-114-02 26

11.1.2 Project Field Supervisor
The PFS will be responsible for ensuring that all Site work is performed in a safe manner. In an emergency situation, the PFS may serve as a focal point for the dissemination of information or as a Community Relations Manager. On this Site, the PFS will act as the Emergency Coordinator.

11.1.3 Project Manager
The PM is ultimately responsible for field implementation of the ERP. This includes communication specific health and safety requirements to the PFS and consulting with the CHSO regarding planned activities, unforeseen conditions and for resolving any questions with identified safety procedures.

11.1.4 Site Health and Safety Officer
The SHSO is responsible for assisting the CHSO in development of the ERP and ensuring its provisions are abided by on-site. The SHSO is responsible for seeing that all personnel are evacuated safely and that all equipment is shut down or secured in the event of a stop work order or evacuation. The SHSO will complete an Accident/Incident form, which includes the following:
• A description of the emergency
• Date, time, and name of all persons/agencies notified and their response • A description of corrective actions implemented or other resolution of the incident.

11.1.5 Emergency Coordinator
The Emergency Coordinator is responsible for implementing the ERP whenever conditions warrant. The Emergency Coordinator is responsible for ensuring the emergency treatment, transport, and evacuation of Site personnel and notification of the appropriate individuals when the ERP has been implemented. The Emergency Coordinator also is responsible for prior notification of emergency services (fire, police, hospital, ambulance, etc.) about the nature and duration of work expected on the Site, types of COCs, possible health and safety effects and the anticipated emergency conditions.

11.1.6 On-Site Personnel
All on-site personnel are responsible for knowing the ERP and its procedures. Personnel will be expected to notify the Emergency Coordinator of occurring or impending emergencies and to cooperate fully once the plan has been implemented. All information is to be communicated to the Emergency Coordinator. All media and public inquires are to be directed to the Emergency Coordinator.

11.2 POTENTIAL EMERGENCIES
The activities, layout, and hazards of the Site have been evaluated to determine anticipated potential emergencies. Five (5) categories of emergencies have been identified. The list will be revised in the event on-site conditions or operations warrant. The ERP will be updated in case of a revision or addition to the list. Anticipated emergencies include:

Cudahy Park Renovation Project, Project # PRE-001 Document Control 357 of 1214 Page 387 of 1692 Converse Project No. 24-41-114-02 27
• Injury or illness
• Fire
• Explosion
• Spill/environmental release
• Natural disaster/hazard.

At this Site, personnel accidents requiring first aid, potential fires, and potential exposure to soil with COCs are emergencies that may arise.

11.3 PUBLIC RESPONSE AGENCIES
Contact between Site personnel and local emergency services will assist in developing a good working relationship and provide an opportunity for the development of effective, overlapping emergency plans. The Emergency Coordinator will contact the local hospital before beginning work on the Site. The nature and duration of work, types of COCs and the potential emergency conditions will be discussed.

11.4 EMERGENCY CONDITIONS
Whenever there is an emergency at the Site, the following steps will be taken:
• An immediate report of the emergency will be made to the PM and PFS • The emergency will be assessed by the PFS and identify:
• The name, location, and telephone numbers of the appropriate agencies • The nature of the emergency
• Hazardous conditions (fire, explosion, etc.)
• The amount of material involved or released
• The extent to which evacuation should occur
• The PFS will notify all personnel on-site and activate the appropriate response • All work will be stopped and evacuation initiated if appropriate • The PFS will notify the following as necessary:

Agency Type of Incident Phone Number
Ambulance Any situation requiring
immediate medical attention 911
St. Francis Medical Center Any situation requiring
medical attention (310) 900-8900
Fire Department Any uncontrollable fires 911
Police Department Any crimes 911
USEPA Damage to the environment (800) 342-4636
TBD Any accident or incident TBD
Should the emergency draw the attention of the public, all inquiries are to be directed to the PFS.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 358 of 1214 Page 388 of 1692 Converse Project No. 24-41-114-02 28

11.5 EMERGENCY EQUIPMENT
In addition to equipment that is to be used only in the event of an emergency, other equipment that may be used in the event of an emergency also may be used as part of regular operations, this may include PPE, telephones, etc. The following emergency equipment will be maintained at the first-aid station:
• Fire extinguisher
• Cell phone
• First-aid kit
• Eye wash solution.

11.6 ON-SITE PERSONNEL INJURY/ILLNESS
First aid will be administered on-site as necessary. Personnel requiring medical attention will be transported or emergency medical services will be contacted to respond. The medical data sheet will accompany the injured person. The route to the hospital is shown on Figure 2. This map will be posted at the first-aid station and is to be taken with the driver of the injured individual. The hospital will be notified of the impending arrival and provided with pertinent information while the injured individual is being transported.

Basic first aid procedures must be followed in the event a person working on-site is injured.

Depending on the severity of the injury, emergency medical response may be sought. If the person can be moved, they will be taken to the edge of the work area where emergency first aid can be administered. If necessary, transportation to the local emergency medical facility will be provided.

If the injury to on-site personnel involves chemical exposure, the following first-aid steps must be taken immediately:
• Eye Exposure – If foreign material (liquid or solid) gets into the eyes, wash eyes immediately for at least 15 minutes using water and lifting the lower and upper lids occasionally. Obtain medical attention immediately.
• Skin Exposure – Wash skin immediately with water. Obtain medical attention immediately.
• Inhalation – If a person has inhaled a large amount of organic vapor, dust, etc., move them to fresh air at once. Obtain medical attention immediately. If breathing has stopped, appropriately trained personnel and/or medical personnel should perform cardiopulmonary resuscitation (CPR). Keep the person warm and comfortable. • Ingestion – If liquid or solid is swallowed, obtain medical attention immediately. The Poison Control Center also must be consulted.

The SSO must inform the PM of any injury/accident and a written report of the accident, its causes and consequences must be submitted to the client within 48 hours of the incident.

11.6.1 Temperature Related Problems
First aid for all forms of heat stress includes cooling the body. This may involve removing PPE and moving the person to a cooler environment to rest.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 359 of 1214 Page 389 of 1692 Converse Project No. 24-41-114-02 29

11.6.2 Emergency Decontamination
In case of a medical emergency, gross decontamination procedures will be implemented and the person transported to the nearest medical facility. If a life threatening injury occurs and the injured person cannot be decontaminated without causing additional injuries, every effort will be made to ensure exposure of others to potential COCs is minimized. The medical facility will be notified of the potential COCs present and the exposure prevention measures that can be employed during treatment.

Decontamination measures for emergencies will be based on the toxicity of the COCs on-site and the immediacy of the emergency.

11.6.3 Fire
The Consultant will not respond to any fire that is larger than is able to be handled by the on-site portable fire extinguishers. Any fire too large to be extinguished by the portable extinguishers will be reported immediately to the local fire department by dialing 911.

There are three (3) basic ways to extinguish a fire:
• Take away its air
• Take away its fuel
• Cool the fire.

To put out a fire:
• Put it out with a fire extinguisher, water or other liquid (e.g., coffee) • Move all flammable materials away from the fire
• Smother the fire with a coat or other heavy, if possible wet, object.

To use a fire extinguisher:

1. Pick the extinguisher up by the handle.

2. Pull the ring at the top to release the safety pin

3. Keep the extinguisher upright, aim at the base of the fire, and squeeze the handle.

No individual should attempt to put out a fire unless they are sure they are able to do it.

SUMMON HELP IMMEDIATELY IF YOU THINK YOU ARE UNABLE TO PUT IT OUT! The fire extinguishers at the Site are multi-purpose dry chemical (ABC). These types of extinguishers are effective on ordinary combustibles, flammable liquids, and electrical equipment. The effective range is approximately five (5) to 15 feet. The contents will be discharged in eight (8) to 25 seconds.

The first five (5) minutes are the most critical in putting out a fire. It is crucial that the fire department be notified as soon as possible when a fire is discovered. Do not hesitate to report small fires. The fire can spread and become a threat to everyone’s safety.

Most fire related deaths occur from poisonous gases, smoke, and panic. Few deaths are the result of being burned. Panic is the most common cause of death in a fire situation. In the event of a fire, know what to do and DO NOT PANIC.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 360 of 1214 Page 390 of 1692 Converse Project No. 24-41-114-02 30
If a fire occurs while working within a building, evacuate by the building by doing the following:

1. Listen to the instructions of the PFS

2. Walk to the nearest exit unless instructed otherwise

3. To prevent a bottleneck, move to the assembly area

4. Await further instructions.

11.6.4 Explosion
An explosion can be the most difficult emergency to deal with. Reasons include trauma, death, fire, unstable structures, secondary explosions, toxic clouds, and destruction of emergency equipment. The following, measures, and backup systems may be required:
• Initiate evacuation procedures
• Notify appropriate response agencies (fire, police, etc.) • Assess situation – are secondary emergencies occurring or about to occur? • Turn off or remove sources of explosives
• Attend to the injured
• Check for exposed live utilities
• Initiate spill response measures (if necessary).

11.7 SPILLS/ENVIRONMENTAL RELEASE
The first responder on the scene is responsible for spill containment until additional help arrives. Upon arriving at the scene, the individual will determine:
• The location of the spill
• If liquid, direction of flow
• If possible the identity of the leaking material
• Potential hazards to responders.

If the leaking material is not completely characterized, the maximum PPE should be worn and only experienced individuals should enter the area.

Spilled liquids may be contained by the construction of dikes, diversion of spills to specific areas, inlet blockage, or solidification. Special attention should be given to quickly preventing spills from leaving the confines of the Site and entering the public right-of-way or sewer/storm drain system.

Equipment or supplies for controlling spills may include the following:
• Sandbags
• Absorbent socks, pillows, etc.
• Dry granular absorbent
• Salvage pumps
• Drums
• Plastic sheets, tarps, salvage covers, etc.
• Absorbent booms
• Barrier booms.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 361 of 1214 Page 391 of 1692 Converse Project No. 24-41-114-02 31
In addition to containing the spilled materials, the source of the spill must also be controlled.

For leaking containers (e.g., drums, small tanks, etc.) the material should be transferred to vessels capable of storing the liquids. Used materials such as absorbent pads/booms/sheets or granular absorbents are to be collected in the appropriate storage containers until they can be disposed of properly.

Once containment of the spill has occurred, and/or sufficient help has arrived, the PM must be notified. The PM then will notify the appropriate parties (e.g., DTSC, USEPA, local fire department, etc.) to report the release.

11.8 NATURAL HAZARDS
In the event of a natural disaster, work will be halted and the Site secured as possible.

Restoration after the event will include a recheck of all operating systems, containment and cleanup of spills and resumption of operations.

11.9 BOMB THREATS/CIVIL COMMOTION
Bomb threats, vandalism, arson, riots, and assaults are almost impossible to anticipate.

However, using common sense and implementing security measures can prevent or reduce their impact and proper response can help control further loss.

11.10 HAZARDOUS MATERIALS INFORMATION
EPA-INFO (800) 342-4636
TOXLINE (301) 496-1131
CHEMTREC (24-hour, emergency) (800) 424-9300
ORNL, Toxicology Information Response Center (615) 576-1743 Poison Control Center (800) 682-9211

11.11 WORK SITE ADDRESS
The Work Site address is 5220 Santa Ana Street, Pomona, California.

11.12 CONTACTS
Converse Consultants: - Michael Van Fleet – (626) 524-9320 Willdan: -TBD
Contractor: -TBD

11.13 HOSPITAL ADDRESS AND ROUTE
Address: St. Francis Medical Center
3630 E Imperial Highway
Lynwood, CA 90262
Phone: (310) 900-8900
Cudahy Park Renovation Project, Project # PRE-001 Document Control 362 of 1214 Page 392 of 1692 Converse Project No. 24-41-114-02 32
Hospital route
Head northwest to Santa Ana Street (30 feet), turn left onto Santa Ana Street Turn left onto Otis Street (1.2 mile),
Turn right onto Imperial Highway (2.1 miles),
Hospital will be on the right (0.3-mile)
Cudahy Park Renovation Project, Project # PRE-001 Document Control 363 of 1214 Page 393 of 1692 Converse Project No. 24-41-114-02 33
Figure 1 Tail Gate Safety Meeting Form

ON-SITE TAILGATE SAFETY MEETING
Project: Proj. Mgr.

Date: Time: Proj. No.

Address:

Specific Location:

Type of Work

SAFETY TOPICS PRESENTED
Protective Clothing/Equipment
Chemical Hazards
Radiation Hazards
Emergency Procedures
Hospital/Clinic Telephone
Hospital Address
Special Equipment
Other
Checklist

1. Emergency information reviewed? ______ & made familiar to all on-site personnel? ______

2. Route to nearest hospital driven? ______ & it's location known to all on-site personnel? ______

3. Site safety plan readily available & its location known to all on-site personnel? ______ Daily update meetings will be held when site tasks and/or conditions change.

ATTENDEES (Expand on back of sheet if necessary)
Name Signature
Meeting Conducted by: ______________________________ __________________________________ Signature Print
Cudahy Park Renovation Project, Project # PRE-001 Document Control 364 of 1214 Page 394 of 1692 Converse Project No. 24-41-114-02 34
Hospital Route Map
Willdan
Cudahy Park, Cudahy, California
Project No:
24-41-114-02
Converse Consultants FIGURE 2
N
Cudahy Park Renovation Project, Project # PRE-001 Document Control 365 of 1214 Page 395 of 1692 CONVERSE Project No. 24-41-114-02
Copyright 2025 CONVERSE CONSULTANTSAppendix D
Information Advisory
Clean Imported Fill
Cudahy Park Renovation Project, Project # PRE-001 Document Control 366 of 1214 Page 396 of 1692 Executive Summary
This fact sheet has been prepared to ensure that inappropriate fill material is not introduced onto sensitive land use properties under the oversight of the DTSC or applicable regulatory authorities. Sensitive land use properties include those that contain facilities such as hospitals, homes, day care centers, and schools. This document only focuses on human health concerns and ecological issues are not addressed.

It identifies those types of land use activities that may be appropriate when determining whether a site may be used as a fill material source area. It also provides guidelines for the appropriate types of analyses that should be performed relative to the former land use, and for the number of samples that should be collected and analyzed based on the estimated volume of fill material that will need to be used.

The information provided in this fact sheet is not regulatory in nature, rather is to be used as a guide, and in most situations the final decision as to the acceptability of fill material for a sensitive land use property is made on a case-by-case basis by the appropriate regulatory agency.

Introduction
The use of imported fill material has recently come under scrutiny because of the instances where contaminated soil has been brought onto an otherwise clean site. However, there are currently no established standards in the statutes or regulations that address environmental requirements for imported fill material.

Therefore, the California Environmental Protection Agency, Department of Toxic Substances Control (DTSC) has prepared this fact sheet to identify procedures that can be used to minimize the possibility of introducing contaminated soil onto a site that requires imported fill material. Such sites include those that are undergoing site remediation, corrective action, and closure activities overseen by DTSC or the appropriate regulatory agency. These procedures may also apply to construction projects that will result in sensitive land uses. The intent of this fact sheet is to protect people who live on or otherwise use a sensitive land use property. By using this fact sheet as a guide, the reader will minimize the chance of introducing fill material that may result in potential risk to human health or the environment at some future time.

California
Environmental
Protection Agency
It is DTSC’s
mission to restore,
protect and
enhance the
environment, to
ensure public
health,
environmental
quality and
economic vitality,
by regulating
hazardous waste,
conducting and
overseeing
cleanups, and
developing and
promoting
pollution
prevention.

State of California

DEPARTMENT OF TOXIC SUBSTANCES CONTROL
Information Advisory
Clean Imported Fill Material
The energy challenge facing California is real. Every Californian needs to take immediate action to reduce energy consumption. For a list of simple ways you can reduce demand and cut your energy costs, see our website at www.dtsc.ca.gov.

D PE MTRA
NE
T
OF

TOXIC SUBSTANCES

CONTROL
October 2001
Cudahy Park Renovation Project, Project # PRE-001 Document Control 367 of 1214 Page 397 of 1692 2 Overview
Both natural and manmade fill materials are used
for a variety of purposes. Fill material properties are commonly controlled to meet the necessary site specific engineering specifications. Because most sites requiring fill material are located in or near urban
areas, the fill materials are often obtained from construction projects that generate an excess of soil, and from demolition debris (asphalt, broken concrete,
etc.). However, materials from those types of sites
may or may not be appropriate, depending on the
proposed use of the fill, and the quality of the assessment and/or mitigation measures, if necessary.

Therefore, unless material from construction
projects can be demonstrated to be free of contamiPotential Contaminants Based on the Fill Source Area Fill Source:

Land near to an existing freeway
Land near a mining area or rock quarry
Agricultural land
Residential/acceptable commercial land
Target Compounds
Lead (EPA methods 6010B or 7471A), PAHs
(EPA method 8310)
Heavy Metals (EPA methods 6010B and
7471A), asbestos (polarized light
microscopy), pH
Pesticides (Organochlorine Pesticides: EPA
method 8081A or 8080A; Organophosphorus Pesticides: EPA method 8141A; Chlorinated Herbicides: EPA method 8151A), heavy metals (EPA methods 6010B and
7471A)
VOCs (EPA method 8021 or 8260B, as
appropriate and combined with collection
by EPA Method 5035), semi-VOCs (EPA
method 8270C), TPH (modified EPA method
8015), PCBs (EPA method 8082 or 8080A),
heavy metals including lead (EPA methods
6010B and 7471A), asbestos (OSHA Method
ID-191)
nation and/or appropriate for the proposed use, the
use of that material as fill should be avoided.

Selecting Fill Material
In general, the fill source area should be located in
nonindustrial areas, and not from sites undergoing
an environmental cleanup. Nonindustrial sites include those that were previously undeveloped, or used solely for residential or agricultural purposes.

If the source is from an agricultural area, care should be taken to insure that the fill does not include
former agricultural waste process byproducts such
as manure or other decomposed organic material.

Undesirable sources of fill material include industrial and/or commercial sites where hazardous ma- *The recommended analyses should be performed in accordance with USEPA SW-846 methods (1996).

Other possible analyses include Hexavalent Chromium: EPA method 7199 Cudahy Park Renovation Project, Project # PRE-001 Document Control 368 of 1214 Page 398 of 1692 3 Area of Individual Borrow Area
2 acres or less
2 to 4 acres
4 to 10 acres
Greater than 10 acres
Volume of Borrow Area Stockpile
Up to 1,000 cubic yards
1,000 to 5,000 cubic yards
Greater than 5,000 cubic yards
Sampling Requirements
Minimum of 4 samples
Minimum of 1 sample every 1/2 acre
Minimum of 8 samples
Minimum of 8 locations with 4 subsamples
per location
Samples per Volume
1 sample per 250 cubic yards
4 samples for first 1000 cubic yards +1
sample per each additional 500 cubic yards
12 samples for first 5,000 cubic yards + 1
sample per each additional 1,000 cubic
yards
Recommended Fill Material Sampling Schedule
terials were used, handled or stored as part of the
business operations, or unpaved parking areas where
petroleum hydrocarbons could have been spilled or
leaked into the soil. Undesirable commercial sites
include former gasoline service stations, retail strip
malls that contained dry cleaners or photographic
processing facilities, paint stores, auto repair and/or painting facilities. Undesirable industrial facilities
include metal processing shops, manufacturing facilities, aerospace facilities, oil refineries, waste treatment plants, etc. Alternatives to using fill from construction sites include the use of fill material obtained from a commercial supplier of fill material or from soil pits in rural or suburban areas. However, care should be taken to ensure that those materials are also uncontaminated.

Documentation and Analysis
In order to minimize the potential of introducing
contaminated fill material onto a site, it is necessary to verify through documentation that the fill source
is appropriate and/or to have the fill material analyzed for potential contaminants based on the location and history of the source area. Fill documentation should include detailed information on the previous use of the land from where the fill is taken, whether an environmental site assessment was performed and its findings, and the results of any testing performed. It is recommended that any such documentation should be signed by an appropriately licensed (CA-registered) individual. If such documentation is not available or is inadequate,
samples of the fill material should be chemically analyzed. Analysis of the fill material should be based on the source of the fill and knowledge of the prior
land use.

Detectable amounts of compounds of concern
within the fill material should be evaluated for risk
in accordance with the DTSC Preliminary Endangerment Assessment (PEA) Guidance Manual. If Cudahy Park Renovation Project, Project # PRE-001 Document Control 369 of 1214 Page 399 of 1692 4 metal analyses are performed, only those metals
(CAM 17 / Title 22) to which risk levels have been
assigned need to be evaluated. At present, the
DTSC is working to establish California Screening Levels (CSL) to determine whether some compounds of concern pose a risk. Until such time as these CSL values are established, DTSC recommends that the DTSC PEA Guidance Manual or an equivalent process be referenced. This guidance may include the Regional Water Quality Control Board’s (RWQCB) guidelines for reuse
of non-hazardous petroleum hydrocarbon contaminated soil as applied to Total Petroleum Hydrocarbons (TPH) only. The RWQCB guidelines should not be used for volatile organic compounds
(VOCs) or semi-volatile organic compounds
(SVOCS). In addition, a standard laboratory data
package, including a summary of the QA/QC
(Quality Assurance/Quality Control) sample results should also accompany all analytical reports.

When possible, representative samples should be collected at the borrow area while the potential fill material is still in place, and analyzed prior to removal from the borrow area. In addition to performing
the appropriate analyses of the fill material, an appropriate number of samples should also be determined based on the approximate volume or area of soil to be used as fill material. The table above can
be used as a guide to determine the number of
samples needed to adequately characterize the fill
material when sampled at the borrow site.

Alternative Sampling
A Phase I or PEA may be conducted prior to sampling to determine whether the borrow area may have been impacted by previous activities on the
property. After the property has been evaluated, any
sampling that may be required can be determined
during a meeting with DTSC or appropriate regulatory agency. However, if it is not possible to analyze the fill material at the borrow area or determine that it is appropriate for use via a Phase I or PEA, it is recommended that one (1) sample per
truckload be collected and analyzed for all compounds of concern to ensure that the imported soil is uncontaminated and acceptable. (See chart on
Potential Contaminants Based on the Fill Source
Area for appropriate analyses). This sampling frequency may be modified upon consultation with the DTSC or appropriate regulatory agency if all of
the fill material is derived from a common borrow
area. However, fill material that is not characterized
at the borrow area will need to be stockpiled either
on or off-site until the analyses have been completed.

In addition, should contaminants exceeding acceptance criteria be identified in the stockpiled fill material, that material will be deemed unacceptable
and new fill material will need to be obtained,
sampled and analyzed. Therefore, the DTSC recommends that all sampling and analyses should be completed prior to delivery to the site to ensure the
soil is free of contamination, and to eliminate unnecessary transportation charges for unacceptable fill material.

Composite sampling for fill material characterization may or may not be appropriate, depending on quality and homogeneity of source/borrow area, and
compounds of concern. Compositing samples for
volatile and semivolatile constituents is not acceptable. Composite sampling for heavy metals, pesticides, herbicides or PAH’s from unanalyzed stockpiled soil is also unacceptable, unless it is stockpiled at the borrow area and originates from the same
source area. In addition, if samples are composited,
they should be from the same soil layer, and not
from different soil layers.

When very large volumes of fill material are anticipated, or when larger areas are being considered as borrow areas, the DTSC recommends that a Phase
I or PEA be conducted on the area to ensure that
the borrow area has not been impacted by previous
activities on the property. After the property has
been evaluated, any sampling that may be required
can be determined during a meeting with the
DTSC.

For further information, call Richard Coffman, Ph.D.,
R.G., at (818) 551-2175.

Cudahy Park Renovation Project, Project # PRE-001 Document Control 370 of 1214 Page 400 of 1692 CONVERSE Project No. 24-41-114-02
Copyright 2025 CONVERSE CONSULTANTS
Soil Screening
FormAppendix E
Cudahy Park Renovation Project, Project # PRE-001 Document Control 371 of 1214 Page 401 of 1692 Soil Screening Form
Soil Stockpile ID No.: Date:

Monitor
Information Calibration Data1 Monitoring Personnel Excavation Summary (Upon completion of each page)
Brand: Gas: Name: Total Cubic Yds
(This page)
Model: Date: Company: Total Cubic Yds
(This date)
Type: By: Phone: Removed from
Site (To date)
Time PID
Reading2 Comments Time PID Reading2 Comments

1. PID to be calibrated to Hexane. If not, hexane corrections factor must be applied.

2. PID readings to be taken from each excavation bucket to the extent feasible I certify that the information contained in the above document is true and correct. I further certify that the above listed hydrocarbon monitor was operated in a manner consistent with the manufactures specifications and the conditions specified within this plan. In addition, I certify that the above readings represent the actual measurements I observed and recorded during the excavation process.

Signature: Date:

Page _______of _______
Cudahy Park Renovation Project, Project # PRE-001 Document Control 372 of 1214 Page 402 of 1692 Cudahy Park Renovation Project, Project # PRE-001 Document Control 373 of 1214 APPENDIX 2.0

SKATEPARK TECHNICAL SPECIFICATIONS
See complete Specifications on Plan No. SK2.0 and SK2.1